Sample records for operating system scheduler

  1. Expert system for on-board satellite scheduling and control

    NASA Technical Reports Server (NTRS)

    Barry, John M.; Sary, Charisse

    1988-01-01

    An Expert System is described which Rockwell Satellite and Space Electronics Division (S&SED) is developing to dynamically schedule the allocation of on-board satellite resources and activities. This expert system is the Satellite Controller. The resources to be scheduled include power, propellant and recording tape. The activities controlled include scheduling satellite functions such as sensor checkout and operation. The scheduling of these resources and activities is presently a labor intensive and time consuming ground operations task. Developing a schedule requires extensive knowledge of the system and subsystems operations, operational constraints, and satellite design and configuration. This scheduling process requires highly trained experts anywhere from several hours to several weeks to accomplish. The process is done through brute force, that is examining cryptic mnemonic data off line to interpret the health and status of the satellite. Then schedules are formulated either as the result of practical operator experience or heuristics - that is rules of thumb. Orbital operations must become more productive in the future to reduce life cycle costs and decrease dependence on ground control. This reduction is required to increase autonomy and survivability of future systems. The design of future satellites require that the scheduling function be transferred from ground to on board systems.

  2. Time-critical multirate scheduling using contemporary real-time operating system services

    NASA Technical Reports Server (NTRS)

    Eckhardt, D. E., Jr.

    1983-01-01

    Although real-time operating systems provide many of the task control services necessary to process time-critical applications (i.e., applications with fixed, invariant deadlines), it may still be necessary to provide a scheduling algorithm at a level above the operating system in order to coordinate a set of synchronized, time-critical tasks executing at different cyclic rates. The scheduling requirements for such applications and develops scheduling algorithms using services provided by contemporary real-time operating systems.

  3. Automated Planning and Scheduling for Planetary Rover Distributed Operations

    NASA Technical Reports Server (NTRS)

    Backes, Paul G.; Rabideau, Gregg; Tso, Kam S.; Chien, Steve

    1999-01-01

    Automated planning and Scheduling, including automated path planning, has been integrated with an Internet-based distributed operations system for planetary rover operations. The resulting prototype system enables faster generation of valid rover command sequences by a distributed planetary rover operations team. The Web Interface for Telescience (WITS) provides Internet-based distributed collaboration, the Automated Scheduling and Planning Environment (ASPEN) provides automated planning and scheduling, and an automated path planner provided path planning. The system was demonstrated on the Rocky 7 research rover at JPL.

  4. Geometric Distribution-Based Readers Scheduling Optimization Algorithm Using Artificial Immune System.

    PubMed

    Duan, Litian; Wang, Zizhong John; Duan, Fu

    2016-11-16

    In the multiple-reader environment (MRE) of radio frequency identification (RFID) system, multiple readers are often scheduled to interrogate the randomized tags via operating at different time slots or frequency channels to decrease the signal interferences. Based on this, a Geometric Distribution-based Multiple-reader Scheduling Optimization Algorithm using Artificial Immune System (GD-MRSOA-AIS) is proposed to fairly and optimally schedule the readers operating from the viewpoint of resource allocations. GD-MRSOA-AIS is composed of two parts, where a geometric distribution function combined with the fairness consideration is first introduced to generate the feasible scheduling schemes for reader operation. After that, artificial immune system (including immune clone, immune mutation and immune suppression) quickly optimize these feasible ones as the optimal scheduling scheme to ensure that readers are fairly operating with larger effective interrogation range and lower interferences. Compared with the state-of-the-art algorithm, the simulation results indicate that GD-MRSOA-AIS could efficiently schedules the multiple readers operating with a fairer resource allocation scheme, performing in larger effective interrogation range.

  5. Geometric Distribution-Based Readers Scheduling Optimization Algorithm Using Artificial Immune System

    PubMed Central

    Duan, Litian; Wang, Zizhong John; Duan, Fu

    2016-01-01

    In the multiple-reader environment (MRE) of radio frequency identification (RFID) system, multiple readers are often scheduled to interrogate the randomized tags via operating at different time slots or frequency channels to decrease the signal interferences. Based on this, a Geometric Distribution-based Multiple-reader Scheduling Optimization Algorithm using Artificial Immune System (GD-MRSOA-AIS) is proposed to fairly and optimally schedule the readers operating from the viewpoint of resource allocations. GD-MRSOA-AIS is composed of two parts, where a geometric distribution function combined with the fairness consideration is first introduced to generate the feasible scheduling schemes for reader operation. After that, artificial immune system (including immune clone, immune mutation and immune suppression) quickly optimize these feasible ones as the optimal scheduling scheme to ensure that readers are fairly operating with larger effective interrogation range and lower interferences. Compared with the state-of-the-art algorithm, the simulation results indicate that GD-MRSOA-AIS could efficiently schedules the multiple readers operating with a fairer resource allocation scheme, performing in larger effective interrogation range. PMID:27854342

  6. Mission Operations Planning and Scheduling System (MOPSS)

    NASA Technical Reports Server (NTRS)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  7. Automated Scheduling of Personnel to Staff Operations for the Mars Science Laboratory

    NASA Technical Reports Server (NTRS)

    Knight, Russell; Mishkin, Andrew; Allbaugh, Alicia

    2014-01-01

    Leveraging previous work on scheduling personnel for space mission operations, we have adapted ASPEN (Activity Scheduling and Planning Environment) [1] to the domain of scheduling personnel for operations of the Mars Science Laboratory. Automated scheduling of personnel is not new. We compare our representations to a sampling of employee scheduling systems available with respect to desired features. We described the constraints required by MSL personnel schedulers and how each is handled by the scheduling algorithm.

  8. Research on crude oil storage and transportation based on optimization algorithm

    NASA Astrophysics Data System (ADS)

    Yuan, Xuhua

    2018-04-01

    At present, the optimization theory and method have been widely used in the optimization scheduling and optimal operation scheme of complex production systems. Based on C++Builder 6 program development platform, the theoretical research results are implemented by computer. The simulation and intelligent decision system of crude oil storage and transportation inventory scheduling are designed. The system includes modules of project management, data management, graphics processing, simulation of oil depot operation scheme. It can realize the optimization of the scheduling scheme of crude oil storage and transportation system. A multi-point temperature measuring system for monitoring the temperature field of floating roof oil storage tank is developed. The results show that by optimizing operating parameters such as tank operating mode and temperature, the total transportation scheduling costs of the storage and transportation system can be reduced by 9.1%. Therefore, this method can realize safe and stable operation of crude oil storage and transportation system.

  9. Space station payload operations scheduling with ESP2

    NASA Technical Reports Server (NTRS)

    Stacy, Kenneth L.; Jaap, John P.

    1988-01-01

    The Mission Analysis Division of the Systems Analysis and Integration Laboratory at the Marshall Space Flight Center is developing a system of programs to handle all aspects of scheduling payload operations for Space Station. The Expert Scheduling Program (ESP2) is the heart of this system. The task of payload operations scheduling can be simply stated as positioning the payload activities in a mission so that they collect their desired data without interfering with other activities or violating mission constraints. ESP2 is an advanced version of the Experiment Scheduling Program (ESP) which was developed by the Mission Integration Branch beginning in 1979 to schedule Spacelab payload activities. The automatic scheduler in ESP2 is an expert system that embodies the rules that expert planners would use to schedule payload operations by hand. This scheduler uses depth-first searching, backtracking, and forward chaining techniques to place an activity so that constraints (such as crew, resources, and orbit opportunities) are not violated. It has an explanation facility to show why an activity was or was not scheduled at a certain time. The ESP2 user can also place the activities in the schedule manually. The program offers graphical assistance to the user and will advise when constraints are being violated. ESP2 also has an option to identify conflict introduced into an existing schedule by changes to payload requirements, mission constraints, and orbit opportunities.

  10. Space network scheduling benchmark: A proof-of-concept process for technology transfer

    NASA Technical Reports Server (NTRS)

    Moe, Karen; Happell, Nadine; Hayden, B. J.; Barclay, Cathy

    1993-01-01

    This paper describes a detailed proof-of-concept activity to evaluate flexible scheduling technology as implemented in the Request Oriented Scheduling Engine (ROSE) and applied to Space Network (SN) scheduling. The criteria developed for an operational evaluation of a reusable scheduling system is addressed including a methodology to prove that the proposed system performs at least as well as the current system in function and performance. The improvement of the new technology must be demonstrated and evaluated against the cost of making changes. Finally, there is a need to show significant improvement in SN operational procedures. Successful completion of a proof-of-concept would eventually lead to an operational concept and implementation transition plan, which is outside the scope of this paper. However, a high-fidelity benchmark using actual SN scheduling requests has been designed to test the ROSE scheduling tool. The benchmark evaluation methodology, scheduling data, and preliminary results are described.

  11. Spike: AI scheduling for Hubble Space Telescope after 18 months of orbital operations

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.

    1992-01-01

    This paper is a progress report on the Spike scheduling system, developed by the Space Telescope Science Institute for long-term scheduling of Hubble Space Telescope (HST) observations. Spike is an activity-based scheduler which exploits artificial intelligence (AI) techniques for constraint representation and for scheduling search. The system has been in operational use since shortly after HST launch in April 1990. Spike was adopted for several other satellite scheduling problems; of particular interest was the demonstration that the Spike framework is sufficiently flexible to handle both long-term and short-term scheduling, on timescales of years down to minutes or less. We describe the recent progress made in scheduling search techniques, the lessons learned from early HST operations, and the application of Spike to other problem domains. We also describe plans for the future evolution of the system.

  12. Maximally Expressive Modeling of Operations Tasks

    NASA Technical Reports Server (NTRS)

    Jaap, John; Richardson, Lea; Davis, Elizabeth

    2002-01-01

    Planning and scheduling systems organize "tasks" into a timeline or schedule. The tasks are defined within the scheduling system in logical containers called models. The dictionary might define a model of this type as "a system of things and relations satisfying a set of rules that, when applied to the things and relations, produce certainty about the tasks that are being modeled." One challenging domain for a planning and scheduling system is the operation of on-board experiments for the International Space Station. In these experiments, the equipment used is among the most complex hardware ever developed, the information sought is at the cutting edge of scientific endeavor, and the procedures are intricate and exacting. Scheduling is made more difficult by a scarcity of station resources. The models to be fed into the scheduler must describe both the complexity of the experiments and procedures (to ensure a valid schedule) and the flexibilities of the procedures and the equipment (to effectively utilize available resources). Clearly, scheduling International Space Station experiment operations calls for a "maximally expressive" modeling schema.

  13. Range and mission scheduling automation using combined AI and operations research techniques

    NASA Technical Reports Server (NTRS)

    Arbabi, Mansur; Pfeifer, Michael

    1987-01-01

    Ground-based systems for Satellite Command, Control, and Communications (C3) operations require a method for planning, scheduling and assigning the range resources such as: antenna systems scattered around the world, communications systems, and personnel. The method must accommodate user priorities, last minute changes, maintenance requirements, and exceptions from nominal requirements. Described are computer programs which solve 24 hour scheduling problems, using heuristic algorithms and a real time interactive scheduling process.

  14. Design of control software for the closed ecology experiment facilities (CEEF)

    NASA Astrophysics Data System (ADS)

    Miyajima, H.; Abe, K.; Hirosaki, T.; Ishikawa, Y.

    A habitation experiment using a closed ecology experiment facilities CEEF was started in fiscal 2005 three experiments in which two humans stayed for one week were conducted Their stays will be extended gradually until fiscal 2009 when an experiment will be launched with two humans staying for four months The CEEF has an ambitious target of acquiring the technology of an advanced life support system and the system is being developed based on the technology of conventional plant systems Especially in respect to supervision and control of the system the system still has little automation This system has many manual operation parts whose starts and stops are determined by human judgment There are even several parts requiring off-line measurements that include analyses performed by hand At present a CEEF behavioral prediction system CPS is being developed as the first stage for controlling such a system In this CPS an operator creates an operational schedule after due consideration However creation of the operational schedule of the complex CEEF is not easy and it is above the operator s capability to fully cope with alterations of the operational schedule that occur during a long-term habitation experiment Therefore we are going to develop an automatic creation function of the operational schedule that will be incorporated into the CPS by the beginning of the habitation experiment in fiscal 2009 This function will enable automation of most of the operational schedule that human operators currently set up In this paper we examine

  15. Conception of Self-Construction Production Scheduling System

    NASA Astrophysics Data System (ADS)

    Xue, Hai; Zhang, Xuerui; Shimizu, Yasuhiro; Fujimura, Shigeru

    With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.

  16. A planning language for activity scheduling

    NASA Technical Reports Server (NTRS)

    Zoch, David R.; Lavallee, David; Weinstein, Stuart; Tong, G. Michael

    1991-01-01

    Mission planning and scheduling of spacecraft operations are becoming more complex at NASA. Described here are a mission planning process; a robust, flexible planning language for spacecraft and payload operations; and a software scheduling system that generates schedules based on planning language inputs. The mission planning process often involves many people and organizations. Consequently, a planning language is needed to facilitate communication, to provide a standard interface, and to represent flexible requirements. The software scheduling system interprets the planning language and uses the resource, time duration, constraint, and alternative plan flexibilities to resolve scheduling conflicts.

  17. Utilizing AI in Temporal, Spatial, and Resource Scheduling

    NASA Technical Reports Server (NTRS)

    Stottler, Richard; Kalton, Annaka; Bell, Aaron

    2006-01-01

    Aurora is a software system enabling the rapid, easy solution of complex scheduling problems involving spatial and temporal constraints among operations and scarce resources (such as equipment, workspace, and human experts). Although developed for use in the International Space Station Processing Facility, Aurora is flexible enough that it can be easily customized for application to other scheduling domains and adapted as the requirements change or become more precisely known over time. Aurora s scheduling module utilizes artificial-intelligence (AI) techniques to make scheduling decisions on the basis of domain knowledge, including knowledge of constraints and their relative importance, interdependencies among operations, and possibly frequent changes in governing schedule requirements. Unlike many other scheduling software systems, Aurora focuses on resource requirements and temporal scheduling in combination. For example, Aurora can accommodate a domain requirement to schedule two subsequent operations to locations adjacent to a shared resource. The graphical interface allows the user to quickly visualize the schedule and perform changes reflecting additional knowledge or alterations in the situation. For example, the user might drag the activity corresponding to the start of operations to reflect a late delivery.

  18. Automating Mid- and Long-Range Scheduling for NASA's Deep Space Network

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.; Tran, Daniel; Arroyo, Belinda; Sorensen, Sugi; Tay, Peter; Carruth, Butch; Coffman, Adam; Wallace, Mike

    2012-01-01

    NASA has recently deployed a new mid-range scheduling system for the antennas of the Deep Space Network (DSN), called Service Scheduling Software, or S(sup 3). This system is architected as a modern web application containing a central scheduling database integrated with a collaborative environment, exploiting the same technologies as social web applications but applied to a space operations context. This is highly relevant to the DSN domain since the network schedule of operations is developed in a peer-to-peer negotiation process among all users who utilize the DSN (representing 37 projects including international partners and ground-based science and calibration users). The initial implementation of S(sup 3) is complete and the system has been operational since July 2011. S(sup 3) has been used for negotiating schedules since April 2011, including the baseline schedules for three launching missions in late 2011. S(sup 3) supports a distributed scheduling model, in which changes can potentially be made by multiple users based on multiple schedule "workspaces" or versions of the schedule. This has led to several challenges in the design of the scheduling database, and of a change proposal workflow that allows users to concur with or to reject proposed schedule changes, and then counter-propose with alternative or additional suggested changes. This paper describes some key aspects of the S(sup 3) system and lessons learned from its operational deployment to date, focusing on the challenges of multi-user collaborative scheduling in a practical and mission-critical setting. We will also describe the ongoing project to extend S(sup 3) to encompass long-range planning, downtime analysis, and forecasting, as the next step in developing a single integrated DSN scheduling tool suite to cover all time ranges.

  19. Applications of dynamic scheduling technique to space related problems: Some case studies

    NASA Astrophysics Data System (ADS)

    Nakasuka, Shinichi; Ninomiya, Tetsujiro

    1994-10-01

    The paper discusses the applications of 'Dynamic Scheduling' technique, which has been invented for the scheduling of Flexible Manufacturing System, to two space related scheduling problems: operation scheduling of a future space transportation system, and resource allocation in a space system with limited resources such as space station or space shuttle.

  20. Video conferencing made easy

    NASA Technical Reports Server (NTRS)

    Larsen, D. Gail; Schwieder, Paul R.

    1993-01-01

    Network video conferencing is advancing rapidly throughout the nation, and the Idaho National Engineering Laboratory (INEL), a Department of Energy (DOE) facility, is at the forefront of the development. Engineers at INEL/EG&G designed and installed a very unique DOE videoconferencing system, offering many outstanding features, that include true multipoint conferencing, user-friendly design and operation with no full-time operators required, and the potential for cost effective expansion of the system. One area where INEL/EG&G engineers made a significant contribution to video conferencing was in the development of effective, user-friendly, end station driven scheduling software. A PC at each user site is used to schedule conferences via a windows package. This software interface provides information to the users concerning conference availability, scheduling, initiation, and termination. The menus are 'mouse' controlled. Once a conference is scheduled, a workstation at the hubs monitors the network to initiate all scheduled conferences. No active operator participation is required once a user schedules a conference through the local PC; the workstation automatically initiates and terminates the conference as scheduled. As each conference is scheduled, hard copy notification is also printed at each participating site. Video conferencing is the wave of the future. The use of these user-friendly systems will save millions in lost productivity and travel cost throughout the nation. The ease of operation and conference scheduling will play a key role on the extent industry uses this new technology. The INEL/EG&G has developed a prototype scheduling system for both commercial and federal government use.

  1. Video conferencing made easy

    NASA Astrophysics Data System (ADS)

    Larsen, D. Gail; Schwieder, Paul R.

    1993-02-01

    Network video conferencing is advancing rapidly throughout the nation, and the Idaho National Engineering Laboratory (INEL), a Department of Energy (DOE) facility, is at the forefront of the development. Engineers at INEL/EG&G designed and installed a very unique DOE videoconferencing system, offering many outstanding features, that include true multipoint conferencing, user-friendly design and operation with no full-time operators required, and the potential for cost effective expansion of the system. One area where INEL/EG&G engineers made a significant contribution to video conferencing was in the development of effective, user-friendly, end station driven scheduling software. A PC at each user site is used to schedule conferences via a windows package. This software interface provides information to the users concerning conference availability, scheduling, initiation, and termination. The menus are 'mouse' controlled. Once a conference is scheduled, a workstation at the hubs monitors the network to initiate all scheduled conferences. No active operator participation is required once a user schedules a conference through the local PC; the workstation automatically initiates and terminates the conference as scheduled. As each conference is scheduled, hard copy notification is also printed at each participating site. Video conferencing is the wave of the future. The use of these user-friendly systems will save millions in lost productivity and travel cost throughout the nation. The ease of operation and conference scheduling will play a key role on the extent industry uses this new technology. The INEL/EG&G has developed a prototype scheduling system for both commercial and federal government use.

  2. Video conferencing made easy

    NASA Astrophysics Data System (ADS)

    Larsen, D. G.; Schwieder, P. R.

    Network video conferencing is advancing rapidly throughout the nation, and the Idaho National Engineering Laboratory (INEL), a Department of Energy (DOE) facility, is at the forefront of the development. Engineers at INEL/EG&G designed and installed a very unique DOE video conferencing system, offering many outstanding features, that include true multipoint conferencing, user-friendly design and operation with no full-time operators required, and the potential for cost effective expansion of the system. One area where INEL/EG&G engineers made a significant contribution to video conferencing was in the development of effective, user-friendly, end station driven scheduling software. A PC at each user site is used to schedule conferences via a windows package. This software interface provides information to the users concerning conference availability, scheduling, initiation, and termination. The menus are 'mouse' controlled. Once a conference is scheduled, a workstation at the hub monitors the network to initiate all scheduled conferences. No active operator participation is required once a user schedules a conference through the local PC; the workstation automatically initiates and terminates the conference as scheduled. As each conference is scheduled, hard copy notification is also printed at each participating site. Video conferencing is the wave of the future. The use of these user-friendly systems will save millions in lost productivity and travel costs throughout the nation. The ease of operation and conference scheduling will play a key role on the extent industry uses this new technology. The INEL/EG&G has developed a prototype scheduling system for both commercial and federal government use.

  3. Assessment of Delivery Accuracy in an Operational-Like Environment

    NASA Technical Reports Server (NTRS)

    Sharma, Shivanjli; Wynnyk, Mitch

    2016-01-01

    In order to enable arrival management concepts and solutions in a Next Generation Air Transportation System (NextGen) environment, ground-based sequencing and scheduling functions were developed to support metering operations in the National Airspace System. These sequencing and scheduling tools are designed to assist air traffic controllers in developing an overall arrival strategy, from enroute down to the terminal area boundary. NASA developed a ground system concept and protoype capability called Terminal Sequencing and Spacing (TSAS) to extend metering operations into the terminal area to the runway. To demonstrate the use of these scheduling and spacing tools in an operational-like environment, the FAA, NASA, and MITRE conducted an Operational Integration Assessment (OIA) of a prototype TSAS system at the FAA's William J. Hughes Technical Center (WJHTC). This paper presents an analysis of the arrival management strategies utilized and delivery accuracy achieved during the OIA. The analysis demonstrates how en route preconditioning, in various forms, and schedule disruptions impact delivery accuracy. As the simulation spanned both enroute and terminal airspace, the use of Ground Interval Management - Spacing (GIM-S) enroute speed advisories was investigated. Delivery accuracy was measured as the difference between the Scheduled Time of Arrival (STA) and the Actual Time of Arrival (ATA). The delivery accuracy was computed across all runs conducted during the OIA, which included deviations from nominal operations which are known to commonly occur in real operations, such as schedule changes and missed approaches. Overall, 83% of all flights were delivered into the terminal airspace within +/- 30 seconds of their STA and 94% of flights were delivered within +/- 60 seconds. The meter fix delivery accuracy standard deviation was found to be between 36 and 55 seconds across all arrival procedures. The data also showed when schedule disruptions were excluded, the percentage of aircraft delivered within +/- 30 seconds was between 85 and 90% across the various arrival procedures at the meter fix. This paper illustrates the ability to meet new delivery accuracy requirements in an operational-like environment using operational systems and NATCA controller participants, while also including common events that might cause disruptions to the schedule and overall system.

  4. DSN Resource Scheduling

    NASA Technical Reports Server (NTRS)

    Wang, Yeou-Fang; Baldwin, John

    2007-01-01

    TIGRAS is client-side software, which provides tracking-station equipment planning, allocation, and scheduling services to the DSMS (Deep Space Mission System). TIGRAS provides functions for schedulers to coordinate the DSN (Deep Space Network) antenna usage time and to resolve the resource usage conflicts among tracking passes, antenna calibrations, maintenance, and system testing activities. TIGRAS provides a fully integrated multi-pane graphical user interface for all scheduling operations. This is a great improvement over the legacy VAX VMS command line user interface. TIGRAS has the capability to handle all DSN resource scheduling aspects from long-range to real time. TIGRAS assists NASA mission operations for DSN tracking of station equipment resource request processes from long-range load forecasts (ten years or longer), to midrange, short-range, and real-time (less than one week) emergency tracking plan changes. TIGRAS can be operated by NASA mission operations worldwide to make schedule requests for the DSN station equipment.

  5. Coordinating space telescope operations in an integrated planning and scheduling architecture

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Smith, Stephen F.; Cesta, Amedeo; D'Aloisi, Daniela

    1992-01-01

    The Heuristic Scheduling Testbed System (HSTS), a software architecture for integrated planning and scheduling, is discussed. The architecture has been applied to the problem of generating observation schedules for the Hubble Space Telescope. This problem is representative of the class of problems that can be addressed: their complexity lies in the interaction of resource allocation and auxiliary task expansion. The architecture deals with this interaction by viewing planning and scheduling as two complementary aspects of the more general process of constructing behaviors of a dynamical system. The principal components of the software architecture are described, indicating how to model the structure and dynamics of a system, how to represent schedules at multiple levels of abstraction in the temporal database, and how the problem solving machinery operates. A scheduler for the detailed management of Hubble Space Telescope operations that has been developed within HSTS is described. Experimental performance results are given that indicate the utility and practicality of the approach.

  6. Automating Mid- and Long-Range Scheduling for the NASA Deep Space Network

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.; Tran, Daniel

    2012-01-01

    NASA has recently deployed a new mid-range scheduling system for the antennas of the Deep Space Network (DSN), called Service Scheduling Software, or S(sup 3). This system was designed and deployed as a modern web application containing a central scheduling database integrated with a collaborative environment, exploiting the same technologies as social web applications but applied to a space operations context. This is highly relevant to the DSN domain since the network schedule of operations is developed in a peer-to-peer negotiation process among all users of the DSN. These users represent not only NASA's deep space missions, but also international partners and ground-based science and calibration users. The initial implementation of S(sup 3) is complete and the system has been operational since July 2011. This paper describes some key aspects of the S(sup 3) system and on the challenges of modeling complex scheduling requirements and the ongoing extension of S(sup 3) to encompass long-range planning, downtime analysis, and forecasting, as the next step in developing a single integrated DSN scheduling tool suite to cover all time ranges.

  7. 14 CFR Section 24 - Profit and Loss Elements

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Reporting Requirements Section 24 Profit and Loss Elements Schedule P-1.1—Statement of Operations (a) This... million. Data reported on this schedule shall be for the overall or system operations of the air carrier. (b) This schedule shall show the results of operations for six-month periods ending June 30 and...

  8. Autonomous mission planning and scheduling: Innovative, integrated, responsive

    NASA Technical Reports Server (NTRS)

    Sary, Charisse; Liu, Simon; Hull, Larry; Davis, Randy

    1994-01-01

    Autonomous mission scheduling, a new concept for NASA ground data systems, is a decentralized and distributed approach to scientific spacecraft planning, scheduling, and command management. Systems and services are provided that enable investigators to operate their own instruments. In autonomous mission scheduling, separate nodes exist for each instrument and one or more operations nodes exist for the spacecraft. Each node is responsible for its own operations which include planning, scheduling, and commanding; and for resolving conflicts with other nodes. One or more database servers accessible to all nodes enable each to share mission and science planning, scheduling, and commanding information. The architecture for autonomous mission scheduling is based upon a realistic mix of state-of-the-art and emerging technology and services, e.g., high performance individual workstations, high speed communications, client-server computing, and relational databases. The concept is particularly suited to the smaller, less complex missions of the future.

  9. Characterization of Tactical Departure Scheduling in the National Airspace System

    NASA Technical Reports Server (NTRS)

    Capps, Alan; Engelland, Shawn A.

    2011-01-01

    This paper discusses and analyzes current day utilization and performance of the tactical departure scheduling process in the National Airspace System (NAS) to understand the benefits in improving this process. The analysis used operational air traffic data from over 1,082,000 flights during the month of January, 2011. Specific metrics included the frequency of tactical departure scheduling, site specific variances in the technology's utilization, departure time prediction compliance used in the tactical scheduling process and the performance with which the current system can predict the airborne slot that aircraft are being scheduled into from the airport surface. Operational data analysis described in this paper indicates significant room for improvement exists in the current system primarily in the area of reduced departure time prediction uncertainty. Results indicate that a significant number of tactically scheduled aircraft did not meet their scheduled departure slot due to departure time uncertainty. In addition to missed slots, the operational data analysis identified increased controller workload associated with tactical departures which were subject to traffic management manual re-scheduling or controller swaps. An analysis of achievable levels of departure time prediction accuracy as obtained by a new integrated surface and tactical scheduling tool is provided to assess the benefit it may provide as a solution to the identified shortfalls. A list of NAS facilities which are likely to receive the greatest benefit from the integrated surface and tactical scheduling technology are provided.

  10. Contingency rescheduling of spacecraft operations

    NASA Technical Reports Server (NTRS)

    Britt, Daniel L.; Geoffroy, Amy L.; Gohring, John R.

    1988-01-01

    Spacecraft activity scheduling was a focus of attention in artificial intelligence recently. Several scheduling systems were devised which more-or-less successfully address various aspects of the activity scheduling problem, though most of these are not yet mature, with the notable expection of NASA's ESP. Few current scheduling systems, however, make any attempt to deal fully with the problem of modifying a schedule in near-real-time in the event of contingencies which may arise during schedule execution. These contingencies can include resources becoming unavailable unpredictably, a change in spacecraft conditions or environment, or the need to perform an activity not scheduled. In these cases it becomes necessary to repair an existing schedule, disrupting ongoing operations as little as possible. Normal scheduling is just a part of that which must be accomplished during contingency rescheduling. A prototype system named MAESTRO was developed for spacecraft activity scheduling. MAESTRO is briefly described with a focus on recent work in the area of real-time contingency handling. Included is a discussion of some of the complexities of the scheduling problem and how they affect contingency rescheduling, such as temporal constraints between activities, activities which may be interrupted and continued in any of several ways, and different ways to choose a resource complement which will allow continuation of an activity. Various heuristics used in MAESTRO for contingency rescheduling is discussed, as are operational concerns such as interaction of the scheduler with spacecraft subsystems controllers.

  11. An operation support expert system based on on-line dynamics simulation and fuzzy reasoning for startup schedule optimization in fossil power plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matsumoto, H.; Eki, Y.; Kaji, A.

    1993-12-01

    An expert system which can support operators of fossil power plants in creating the optimum startup schedule and executing it accurately is described. The optimum turbine speed-up and load-up pattern is obtained through an iterative manner which is based on fuzzy resonating using quantitative calculations as plant dynamics models and qualitative knowledge as schedule optimization rules with fuzziness. The rules represent relationships between stress margins and modification rates of the schedule parameters. Simulations analysis proves that the system provides quick and accurate plant startups.

  12. Hard real-time beam scheduler enables adaptive images in multi-probe systems

    NASA Astrophysics Data System (ADS)

    Tobias, Richard J.

    2014-03-01

    Real-time embedded-system concepts were adapted to allow an imaging system to responsively control the firing of multiple probes. Large-volume, operator-independent (LVOI) imaging would increase the diagnostic utility of ultrasound. An obstacle to this innovation is the inability of current systems to drive multiple transducers dynamically. Commercial systems schedule scanning with static lists of beams to be fired and processed; here we allow an imager to adapt to changing beam schedule demands, as an intelligent response to incoming image data. An example of scheduling changes is demonstrated with a flexible duplex mode two-transducer application mimicking LVOI imaging. Embedded-system concepts allow an imager to responsively control the firing of multiple probes. Operating systems use powerful dynamic scheduling algorithms, such as fixed priority preemptive scheduling. Even real-time operating systems lack the timing constraints required for ultrasound. Particularly for Doppler modes, events must be scheduled with sub-nanosecond precision, and acquired data is useless without this requirement. A successful scheduler needs unique characteristics. To get close to what would be needed in LVOI imaging, we show two transducers scanning different parts of a subjects leg. When one transducer notices flow in a region where their scans overlap, the system reschedules the other transducer to start flow mode and alter its beams to get a view of the observed vessel and produce a flow measurement. The second transducer does this in a focused region only. This demonstrates key attributes of a successful LVOI system, such as robustness against obstructions and adaptive self-correction.

  13. Innovative routing and scheduling concepts for transit systems.

    DOT National Transportation Integrated Search

    1984-01-01

    The objective of this research was to investigate innovative routing and scheduling concepts to determine how transit systems in Virginia may improve ridership and reduce operating costs. Information on innovative routing and scheduling concepts was ...

  14. Study and Demonstration of Planning and Scheduling Concepts for the Earth Observing System Data and Information System

    NASA Technical Reports Server (NTRS)

    Davis, Randal; Thalman, Nancy

    1993-01-01

    The University of Colorado's Laboratory for Atmospheric and Space Physics (CU/LASP) along with the Goddard Space Flight Center (GSFC) and the Jet Propulsion Laboratory (JPL) designed, implemented, tested, and demonstrated a prototype of the distributed, hierarchical planning and scheduling system comtemplated for the Earth Observing System (EOS) project. The planning and scheduling prototype made use of existing systems: CU/LASP's Operations and Science Instrument Support Planning and Scheduling (OASIS-PS) software package; GSFC's Request Oriented Scheduling Engine (ROSE); and JPL's Plan Integrated Timeliner 2 (Plan-It-2). Using these tools, four scheduling nodes were implemented and tied together using a new communications protocol for scheduling applications called the Scheduling Applications Interface Language (SAIL). An extensive and realistic scenario of EOS satellite operations was then developed and the prototype scheduling system was tested and demonstrated using the scenario. Two demonstrations of the system were given to NASA personnel and EOS core system (ECS) contractor personnel. A comprehensive volume of lessons learned was generated and a meeting was held with NASA and ECS representatives to review these lessons learned. A paper and presentation on the project's final results was given at the American Institute of Aeronautics and Astronautics Computing in Aerospace 9 conference.

  15. Parallel-aware, dedicated job co-scheduling within/across symmetric multiprocessing nodes

    DOEpatents

    Jones, Terry R.; Watson, Pythagoras C.; Tuel, William; Brenner, Larry; ,Caffrey, Patrick; Fier, Jeffrey

    2010-10-05

    In a parallel computing environment comprising a network of SMP nodes each having at least one processor, a parallel-aware co-scheduling method and system for improving the performance and scalability of a dedicated parallel job having synchronizing collective operations. The method and system uses a global co-scheduler and an operating system kernel dispatcher adapted to coordinate interfering system and daemon activities on a node and across nodes to promote intra-node and inter-node overlap of said interfering system and daemon activities as well as intra-node and inter-node overlap of said synchronizing collective operations. In this manner, the impact of random short-lived interruptions, such as timer-decrement processing and periodic daemon activity, on synchronizing collective operations is minimized on large processor-count SPMD bulk-synchronous programming styles.

  16. ESSOPE: Towards S/C operations with reactive schedule planning

    NASA Technical Reports Server (NTRS)

    Wheadon, J.

    1993-01-01

    The ESSOPE is a prototype front-end tool running on a Sun workstation and interfacing to ESOC's MSSS spacecraft control system for the exchange of telecommand requests (to MSSS) and telemetry reports (from MSSS). ESSOPE combines an operations Planner-Scheduler, with a Schedule Execution Control function. Using an internal 'model' of the spacecraft, the Planner generates a schedule based on utilization requests for a variety of payload services by a community of Olympus users, and incorporating certain housekeeping operations. Conflicts based on operational constraints are automatically resolved, by employing one of several available strategies. The schedule is passed to the execution function which drives MSSS to perform it. When the schedule can no longer be met, either because the operator interferes (by delays or changes of requirements), or because ESSOPE has recognized some spacecraft anomalies, the Planner produces a modified schedule maintaining the on-going procedures as far as consistent with the new constraints or requirements.

  17. Putting ROSE to Work: A Proposed Application of a Request-Oriented Scheduling Engine for Space Station Operations

    NASA Technical Reports Server (NTRS)

    Jaap, John; Muery, Kim

    2000-01-01

    Scheduling engines are found at the core of software systems that plan and schedule activities and resources. A Request-Oriented Scheduling Engine (ROSE) is one that processes a single request (adding a task to a timeline) and then waits for another request. For the International Space Station, a robust ROSE-based system would support multiple, simultaneous users, each formulating requests (defining scheduling requirements), submitting these requests via the internet to a single scheduling engine operating on a single timeline, and immediately viewing the resulting timeline. ROSE is significantly different from the engine currently used to schedule Space Station operations. The current engine supports essentially one person at a time, with a pre-defined set of requirements from many payloads, working in either a "batch" scheduling mode or an interactive/manual scheduling mode. A planning and scheduling process that takes advantage of the features of ROSE could produce greater customer satisfaction at reduced cost and reduced flow time. This paper describes a possible ROSE-based scheduling process and identifies the additional software component required to support it. Resulting changes to the management and control of the process are also discussed.

  18. Coordination between Generation and Transmission Maintenance Scheduling by Means of Multi-agent Technique

    NASA Astrophysics Data System (ADS)

    Nagata, Takeshi; Tao, Yasuhiro; Utatani, Masahiro; Sasaki, Hiroshi; Fujita, Hideki

    This paper proposes a multi-agent approach to maintenance scheduling in restructured power systems. The restructuring of electric power industry has resulted in market-based approaches for unbundling a multitude of service provided by self-interested entities such as power generating companies (GENCOs), transmission providers (TRANSCOs) and distribution companies (DISCOs). The Independent System Operator (ISO) is responsible for the security of the system operation. The schedule submitted to ISO by GENCOs and TRANSCOs should satisfy security and reliability constraints. The proposed method consists of several GENCO Agents (GAGs), TARNSCO Agents (TAGs) and a ISO Agent(IAG). The IAG’s role in maintenance scheduling is limited to ensuring that the submitted schedules do not cause transmission congestion or endanger the system reliability. From the simulation results, it can be seen the proposed multi-agent approach could coordinate between generation and transmission maintenance schedules.

  19. The LSST OCS scheduler design

    NASA Astrophysics Data System (ADS)

    Delgado, Francisco; Schumacher, German

    2014-08-01

    The Large Synoptic Survey Telescope (LSST) is a complex system of systems with demanding performance and operational requirements. The nature of its scientific goals requires a special Observatory Control System (OCS) and particularly a very specialized automatic Scheduler. The OCS Scheduler is an autonomous software component that drives the survey, selecting the detailed sequence of visits in real time, taking into account multiple science programs, the current external and internal conditions, and the history of observations. We have developed a SysML model for the OCS Scheduler that fits coherently in the OCS and LSST integrated model. We have also developed a prototype of the Scheduler that implements the scheduling algorithms in the simulation environment provided by the Operations Simulator, where the environment and the observatory are modeled with real weather data and detailed kinematics parameters. This paper expands on the Scheduler architecture and the proposed algorithms to achieve the survey goals.

  20. Expert mission planning and replanning scheduling system for NASA KSC payload operations

    NASA Technical Reports Server (NTRS)

    Pierce, Roger

    1987-01-01

    EMPRESS (Expert Mission Planning and REplanning Scheduling System) is an expert system created to assist payload mission planners at Kennedy in the long range planning and scheduling of horizontal payloads for space shuttle flights. Using the current flight manifest, these planners develop mission and payload schedules detailing all processing to be performed in the Operations and Checkout building at Kennedy. With the EMPRESS system, schedules are generated quickly using standard flows that represent the tasks and resources required to process a specific horizontal carrier. Resources can be tracked and resource conflicts can be determined and resolved interactively. Constraint relationships between tasks are maintained and can be enforced when a task is moved or rescheduled. The domain, structure, and functionality of the EMPRESS system is briefly designed. The limitations of the EMPRESS system are described as well as improvements expected with the EMPRESS-2 development.

  1. Operating room scheduling using hybrid clustering priority rule and genetic algorithm

    NASA Astrophysics Data System (ADS)

    Santoso, Linda Wahyuni; Sinawan, Aisyah Ashrinawati; Wijaya, Andi Rahadiyan; Sudiarso, Andi; Masruroh, Nur Aini; Herliansyah, Muhammad Kusumawan

    2017-11-01

    Operating room is a bottleneck resource in most hospitals so that operating room scheduling system will influence the whole performance of the hospitals. This research develops a mathematical model of operating room scheduling for elective patients which considers patient priority with limit number of surgeons, operating rooms, and nurse team. Clustering analysis was conducted to the data of surgery durations using hierarchical and non-hierarchical methods. The priority rule of each resulting cluster was determined using Shortest Processing Time method. Genetic Algorithm was used to generate daily operating room schedule which resulted in the lowest values of patient waiting time and nurse overtime. The computational results show that this proposed model reduced patient waiting time by approximately 32.22% and nurse overtime by approximately 32.74% when compared to actual schedule.

  2. Integrated planning and scheduling for Earth science data processing

    NASA Technical Reports Server (NTRS)

    Boddy, Mark; White, Jim; Goldman, Robert; Short, Nick, Jr.

    1995-01-01

    Several current NASA programs such as the EOSDIS Core System (ECS) have data processing and data management requirements that call for an integrated planning and scheduling capability. In this paper, we describe the experience of applying advanced scheduling technology operationally, in terms of what was accomplished, lessons learned, and what remains to be done in order to achieve similar successes in ECS and other programs. We discuss the importance and benefits of advanced scheduling tools, and our progress toward realizing them, through examples and illustrations based on ECS requirements. The first part of the paper focuses on the Data Archive and Distribution (DADS) V0 Scheduler. We then discuss system integration issues ranging from communication with the scheduler to the monitoring of system events and re-scheduling in response to them. The challenge of adapting the scheduler to domain-specific features and scheduling policies is also considered. Extrapolation to the ECS domain raises issues of integrating scheduling with a product-generation planner (such as PlaSTiC), and implementing conditional planning in an operational system. We conclude by briefly noting ongoing technology development and deployment projects being undertaken by HTC and the ISTB.

  3. 29 CFR 1952.221 - Developmental schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Developmental schedule. 1952.221 Section 1952.221 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... Management data system operational July 1, 1973. Automated Management data system operational January 1, 1974...

  4. Payload crew training scheduler (PACTS) user's manual

    NASA Technical Reports Server (NTRS)

    Shipman, D. L.

    1980-01-01

    The operation of the payload specialist training scheduler (PACTS) is discussed in this user's manual which is used to schedule payload specialists for mission training on the Spacelab experiments. The PACTS program is a fully automated interactive, computerized scheduling program equipped with tutorial displays. The tutorial displays are sufficiently detailed for use by a program analyst having no computer experience. The PACTS program is designed to operate on the UNIVAC 1108 computer system, and has the capability to load output into a PDP 11/45 Interactive Graphics Display System for printing schedules. The program has the capacity to handle up to three overlapping Spacelab missions.

  5. Enabling New Operations Concepts for Lunar and Mars Exploration

    NASA Astrophysics Data System (ADS)

    Jaap, John; Maxwell, Theresa

    2005-02-01

    The planning and scheduling of human space activities is an expensive and time-consuming task that seldom provides the crew with the control, flexibility, or insight that they need. During the past thirty years, scheduling software has seen only incremental improvements; however, software limitations continue to prevent even evolutionary improvements in the ``operations concept'' that is used for human space missions. Space missions are planned on the ground long before they are executed in space, and the crew has little input or influence on the schedule. In recent years the crew has been presented with a ``job jar'' of activities that they can do whenever they have time, but the contents of the jar is limited to tasks that do not use scarce shared resources and do not have external timing constraints. Consequently, the crew has no control over the schedule of the majority of their own tasks. As humans venture farther from earth for longer durations, it will become imperative that they have the ability to plan and schedule not only their own activities, but also the unattended activities of the systems, equipment, and robots on the journey with them. Significant software breakthroughs are required to enable the change in the operations concept. The crew does not have the time to build or modify the schedule by hand. They only need to issue a request to schedule a task and the system should automatically do the rest. Of course, the crew should not be required to build the complete schedule. Controllers on the ground should contribute the models and schedules where they have the better knowledge. The system must allow multiple simultaneous users, some on earth and some in space. The Mission Operations Laboratory at NASA's Marshall Space Flight Center has been researching and prototyping a modeling schema, scheduling engine, and system architecture that can enable the needed paradigm shift - it can make the crew autonomous. This schema and engine can be the core of a planning and scheduling system that would enable multiple planners, some on the earth and some in space, to build one integrated timeline. Its modeling schema can capture all the task requirements; its scheduling engine can build the schedule automatically; and its architecture can allow those (on earth and in space) with the best knowledge of the tasks to schedule them. This paper describes the enabling technology and proposes an operations concept for astronauts autonomously scheduling their activities and the activities around them.

  6. Enabling New Operations Concepts for Lunar and Mars Exploration

    NASA Technical Reports Server (NTRS)

    Jaap, John; Maxwell, Theresa

    2005-01-01

    The planning and scheduling of human space activities is an expensive and time-consuming task that seldom provides the crew with the control, flexibility, or insight that they need. During the past thirty years, scheduling software has seen only incremental improvements; however, software limitations continue to prevent even evolutionary improvements in the operations concept that is used for human space missions. Space missions are planned on the ground long before they are executed in space, and the crew has little input or influence on the schedule. In recent years the crew has been presented with a job jar of activities that they can do whenever they have time, but the contents of the jar is limited to tasks that do not use scarce shared resources and do not have external timing constraints. Consequently, the crew has no control over the schedule of the majority of their own tasks. As humans venture farther from earth for longer durations, it will become imperative that they have the ability to plan and schedule not only their own activities, but also the unattended activities of the systems, equipment, and robots on the journey with them. Significant software breakthroughs are required to enable the change in the operations concept. The crew does not have the time to build or modify the schedule by hand. They only need to issue a request to schedule a task and the system should automatically do the rest. Of course, the crew should not be required to build the complete schedule. Controllers on the ground should contribute the models and schedules where they have the better knowledge. The system must allow multiple simultaneous users, some on earth and some in space. The Mission Operations Laboratory at NASA's Marshall Space flight Center has been researching and prototyping a modeling schema, scheduling engine, and system architecture that can enable the needed paradigm shift - it can make the crew autonomous. This schema and engine can be the core of a planning and scheduling system that would enable multiple planners, some on the earth and some in space, to build one integrated timeline. Its modeling schema can capture all the task requirements; its scheduling engine can build the schedule automatically, and its architecture can allow those (on earth and in space) with the best knowledge of the tasks to schedule them. This paper describes the enabling technology and proposes an operations concept for astronauts autonomously scheduling their activities and the activities around them.

  7. Operational VGOS Scheduling

    NASA Astrophysics Data System (ADS)

    Searle, Anthony; Petrachenko, Bill

    2016-12-01

    The VLBI Global Observing System (VGOS) has been designed to take advantage of advances in data recording speeds and storage capacity, allowing for smaller and faster antennas, wider bandwidths, and shorter observation durations. Here, schedules for a ``realistic" VGOS network, frequency sequences, and expanded source lists are presented using a new source-based scheduling algorithm. The VGOS aim for continuous observations presents new operational challenges. As the source-based strategy is independent of the observing network, there are operational advantages which allow for more flexible scheduling of continuous VLBI observations. Using VieVS, simulations of several schedules are presented and compared with previous VGOS studies.

  8. Optimizing Hydropower Day-Ahead Scheduling for the Oroville-Thermalito Project

    NASA Astrophysics Data System (ADS)

    Veselka, T. D.; Mahalik, M.

    2012-12-01

    Under an award from the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, Water Power Program, a team of national laboratories is developing and demonstrating a suite of advanced, integrated analytical tools to assist managers and planners increase hydropower resources while enhancing the environment. As part of the project, Argonne National Laboratory is developing the Conventional Hydropower Energy and Environmental Systems (CHEERS) model to optimize day-ahead scheduling and real-time operations. We will present the application of CHEERS to the Oroville-Thermalito Project located in Northern California. CHEERS will aid California Department of Water Resources (CDWR) schedulers in making decisions about unit commitments and turbine-level operating points using a system-wide approach to increase hydropower efficiency and the value of power generation and ancillary services. The model determines schedules and operations that are constrained by physical limitations, characteristics of plant components, operational preferences, reliability, and environmental considerations. The optimization considers forebay and afterbay implications, interactions between cascaded power plants, turbine efficiency curves and rough zones, and operator preferences. CHEERS simultaneously considers over time the interactions among all CDWR power and water resources, hydropower economics, reservoir storage limitations, and a set of complex environmental constraints for the Thermalito Afterbay and Feather River habitats. Power marketers, day-ahead schedulers, and plant operators provide system configuration and detailed operational data, along with feedback on model design and performance. CHEERS is integrated with CDWR data systems to obtain historic and initial conditions of the system as the basis from which future operations are then optimized. Model results suggest alternative operational regimes that improve the value of CDWR resources to the grid while enhancing the environment and complying with water delivery obligations for non-power uses.

  9. Centralized mission planning and scheduling system for the Landsat Data Continuity Mission

    USGS Publications Warehouse

    Kavelaars, Alicia; Barnoy, Assaf M.; Gregory, Shawna; Garcia, Gonzalo; Talon, Cesar; Greer, Gregory; Williams, Jason; Dulski, Vicki

    2014-01-01

    Satellites in Low Earth Orbit provide missions with closer range for studying aspects such as geography and topography, but often require efficient utilization of space and ground assets. Optimizing schedules for these satellites amounts to a complex planning puzzle since it requires operators to face issues such as discontinuous ground contacts, limited onboard memory storage, constrained downlink margin, and shared ground antenna resources. To solve this issue for the Landsat Data Continuity Mission (LDCM, Landsat 8), all the scheduling exchanges for science data request, ground/space station contact, and spacecraft maintenance and control will be coordinated through a centralized Mission Planning and Scheduling (MPS) engine, based upon GMV’s scheduling system flexplan9 . The synchronization between all operational functions must be strictly maintained to ensure efficient mission utilization of ground and spacecraft activities while working within the bounds of the space and ground resources, such as Solid State Recorder (SSR) and available antennas. This paper outlines the functionalities that the centralized planning and scheduling system has in its operational control and management of the Landsat 8 spacecraft.

  10. Iterative Repair Planning for Spacecraft Operations Using the Aspen System

    NASA Technical Reports Server (NTRS)

    Rabideau, G.; Knight, R.; Chien, S.; Fukunaga, A.; Govindjee, A.

    2000-01-01

    This paper describes the Automated Scheduling and Planning Environment (ASPEN). ASPEN encodes complex spacecraft knowledge of operability constraints, flight rules, spacecraft hardware, science experiments and operations procedures to allow for automated generation of low level spacecraft sequences. Using a technique called iterative repair, ASPEN classifies constraint violations (i.e., conflicts) and attempts to repair each by performing a planning or scheduling operation. It must reason about which conflict to resolve first and what repair method to try for the given conflict. ASPEN is currently being utilized in the development of automated planner/scheduler systems for several spacecraft, including the UFO-1 naval communications satellite and the Citizen Explorer (CX1) satellite, as well as for planetary rover operations and antenna ground systems automation. This paper focuses on the algorithm and search strategies employed by ASPEN to resolve spacecraft operations constraints, as well as the data structures for representing these constraints.

  11. Generically Used Expert Scheduling System (GUESS): User's Guide Version 1.0

    NASA Technical Reports Server (NTRS)

    Liebowitz, Jay; Krishnamurthy, Vijaya; Rodens, Ira

    1996-01-01

    This user's guide contains instructions explaining how to best operate the program GUESS, a generic expert scheduling system. GUESS incorporates several important features for a generic scheduler, including automatic scheduling routines to generate a 'first' schedule for the user, a user interface that includes Gantt charts and enables the human scheduler to manipulate schedules manually, diagnostic report generators, and a variety of scheduling techniques. The current version of GUESS runs on an IBM PC or compatible in the Windows 3.1 or Windows '95 environment.

  12. Improving the Operations of the Earth Observing One Mission via Automated Mission Planning

    NASA Technical Reports Server (NTRS)

    Chien, Steve A.; Tran, Daniel; Rabideau, Gregg; Schaffer, Steve; Mandl, Daniel; Frye, Stuart

    2010-01-01

    We describe the modeling and reasoning about operations constraints in an automated mission planning system for an earth observing satellite - EO-1. We first discuss the large number of elements that can be naturally represented in an expressive planning and scheduling framework. We then describe a number of constraints that challenge the current state of the art in automated planning systems and discuss how we modeled these constraints as well as discuss tradeoffs in representation versus efficiency. Finally we describe the challenges in efficiently generating operations plans for this mission. These discussions involve lessons learned from an operations model that has been in use since Fall 2004 (called R4) as well as a newer more accurate operations model operational since June 2009 (called R5). We present analysis of the R5 software documenting a significant (greater than 50%) increase in the number of weekly observations scheduled by the EO-1 mission. We also show that the R5 mission planning system produces schedules within 15% of an upper bound on optimal schedules. This operational enhancement has created value of millions of dollars US over the projected remaining lifetime of the EO-1 mission.

  13. Assessing Weapon System Acquisition Cycle Times: Setting Program Schedules

    DTIC Science & Technology

    2015-06-01

    additional research, focused as follows: 1 . Acquisition schedule development: How are schedules for acquisition programs actually set and how are they...the germinating requirements documents specific to systems reviewed. A clear statement was found for only one system (Air and Missile Defense Radar...AMDR) when specific threat capabilities were projected to be operational. • Program schedule setting varies in rigor: 1 Up to the interim version of

  14. 78 FR 19744 - Privacy Act of 1974; Privacy Act System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-02

    ...: NASA Guest Operations System. SECURITY CLASSIFICATION: None. SYSTEM LOCATION: Location 1, as set forth... in accordance with the guidelines defined in the NASA Records Retention Schedules (NRRS), Schedule 1...

  15. Integrated scheduling of a container handling system with simultaneous loading and discharging operations

    NASA Astrophysics Data System (ADS)

    Li, Chen; Lu, Zhiqiang; Han, Xiaole; Zhang, Yuejun; Wang, Li

    2016-03-01

    The integrated scheduling of container handling systems aims to optimize the coordination and overall utilization of all handling equipment, so as to minimize the makespan of a given set of container tasks. A modified disjunctive graph is proposed and a mixed 0-1 programming model is formulated. A heuristic algorithm is presented, in which the original problem is divided into two subproblems. In the first subproblem, contiguous bay crane operations are applied to obtain a good quay crane schedule. In the second subproblem, proper internal truck and yard crane schedules are generated to match the given quay crane schedule. Furthermore, a genetic algorithm based on the heuristic algorithm is developed to search for better solutions. The computational results show that the proposed algorithm can efficiently find high-quality solutions. They also indicate the effectiveness of simultaneous loading and discharging operations compared with separate ones.

  16. The role of the production scheduling system in rescheduling

    NASA Astrophysics Data System (ADS)

    Kalinowski, K.; Grabowik, C.; Kempa, W.; Paprocka, I.

    2015-11-01

    The paper presents the rescheduling problem in the context of cooperation between production scheduling system (PSS) and other units in an integrated manufacturing environment - decision makers and software systems. The main aim is to discuss the PSS functionality for maximizing automation of the rescheduling process, reducing the response time and improving the quality of generated solutions. PSSs operate in the meeting of tactical and operational level of planning and control, and play an important role in the production preparation and control. On the basis of information about orders, technology and production system state (e.g. resources availability) they prepare and/or update a detailed plan of production flow - a schedule. All necessary data for scheduling and rescheduling are usually collected in other systems both from organizational and technical production preparation, e.g. ERP, PLM, MES, CAPP or others, as well as they are entered directly by the decision- makers/operators. Data acquired in this way are often incomplete and inconsistent. Therefore the existing rescheduling software works according to interactive method - rather support but does not replace the human decision maker in tasks planning. When rescheduling, due to the limited amount of time to make a decision this interaction is particularly important. An additional problem arises in data acquisition, in the process of data exchanging between systems or in the identification of new data sources and their processing. Different approaches to rescheduling were characterized, including those solutions, where all these operations are carried out by an autonomous system and those in which scheduling is performed only upon request from the outside, for the newly created scheduling data representing the current state of the production system.

  17. Lessons Learned In Developing Multiple Distributed Planning Systems for the International Space Station

    NASA Technical Reports Server (NTRS)

    Maxwell, Theresa G.; McNair, Ann R. (Technical Monitor)

    2002-01-01

    The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The "pieces" are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

  18. Lessons Learned in Developing Multiple Distributed Planning Systems for the International Space Station

    NASA Technical Reports Server (NTRS)

    Maxwell, Theresa G.

    2002-01-01

    The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The pieces are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

  19. Design and Scheduling of Microgrids using Benders Decomposition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nagarajan, Adarsh; Ayyanar, Raja

    2016-11-21

    The distribution feeder laterals in a distribution feeder with relatively high PV generation as compared to the load can be operated as microgrids to achieve reliability, power quality and economic benefits. However, renewable resources are intermittent and stochastic in nature. A novel approach for sizing and scheduling an energy storage system and microturbine for reliable operation of microgrids is proposed. The size and schedule of an energy storage system and microturbine are determined using Benders' decomposition, considering PV generation as a stochastic resource.

  20. Automated Platform Management System Scheduling

    NASA Technical Reports Server (NTRS)

    Hull, Larry G.

    1990-01-01

    The Platform Management System was established to coordinate the operation of platform systems and instruments. The management functions are split between ground and space components. Since platforms are to be out of contact with the ground more than the manned base, the on-board functions are required to be more autonomous than those of the manned base. Under this concept, automated replanning and rescheduling, including on-board real-time schedule maintenance and schedule repair, are required to effectively and efficiently meet Space Station Freedom mission goals. In a FY88 study, we developed several promising alternatives for automated platform planning and scheduling. We recommended both a specific alternative and a phased approach to automated platform resource scheduling. Our recommended alternative was based upon use of exactly the same scheduling engine in both ground and space components of the platform management system. Our phased approach recommendation was based upon evolutionary development of the platform. In the past year, we developed platform scheduler requirements and implemented a rapid prototype of a baseline platform scheduler. Presently we are rehosting this platform scheduler rapid prototype and integrating the scheduler prototype into two Goddard Space Flight Center testbeds, as the ground scheduler in the Scheduling Concepts, Architectures, and Networks Testbed and as the on-board scheduler in the Platform Management System Testbed. Using these testbeds, we will investigate rescheduling issues, evaluate operational performance and enhance the platform scheduler prototype to demonstrate our evolutionary approach to automated platform scheduling. The work described in this paper was performed prior to Space Station Freedom rephasing, transfer of platform responsibility to Code E, and other recently discussed changes. We neither speculate on these changes nor attempt to predict the impact of the final decisions. As a consequence some of our work and results may be outdated when this paper is published.

  1. Maximally Expressive Modeling

    NASA Technical Reports Server (NTRS)

    Jaap, John; Davis, Elizabeth; Richardson, Lea

    2004-01-01

    Planning and scheduling systems organize tasks into a timeline or schedule. Tasks are logically grouped into containers called models. Models are a collection of related tasks, along with their dependencies and requirements, that when met will produce the desired result. One challenging domain for a planning and scheduling system is the operation of on-board experiments for the International Space Station. In these experiments, the equipment used is among the most complex hardware ever developed; the information sought is at the cutting edge of scientific endeavor; and the procedures are intricate and exacting. Scheduling is made more difficult by a scarcity of station resources. The models to be fed into the scheduler must describe both the complexity of the experiments and procedures (to ensure a valid schedule) and the flexibilities of the procedures and the equipment (to effectively utilize available resources). Clearly, scheduling International Space Station experiment operations calls for a maximally expressive modeling schema.

  2. Research on the ITOC based scheduling system for ship piping production

    NASA Astrophysics Data System (ADS)

    Li, Rui; Liu, Yu-Jun; Hamada, Kunihiro

    2010-12-01

    Manufacturing of ship piping systems is one of the major production activities in shipbuilding. The schedule of pipe production has an important impact on the master schedule of shipbuilding. In this research, the ITOC concept was introduced to solve the scheduling problems of a piping factory, and an intelligent scheduling system was developed. The system, in which a product model, an operation model, a factory model, and a knowledge database of piping production were integrated, automated the planning process and production scheduling. Details of the above points were discussed. Moreover, an application of the system in a piping factory, which achieved a higher level of performance as measured by tardiness, lead time, and inventory, was demonstrated.

  3. A Clonal Selection Algorithm for Minimizing Distance Travel and Back Tracking of Automatic Guided Vehicles in Flexible Manufacturing System

    NASA Astrophysics Data System (ADS)

    Chawla, Viveak Kumar; Chanda, Arindam Kumar; Angra, Surjit

    2018-03-01

    The flexible manufacturing system (FMS) constitute of several programmable production work centers, material handling systems (MHSs), assembly stations and automatic storage and retrieval systems. In FMS, the automatic guided vehicles (AGVs) play a vital role in material handling operations and enhance the performance of the FMS in its overall operations. To achieve low makespan and high throughput yield in the FMS operations, it is highly imperative to integrate the production work centers schedules with the AGVs schedules. The Production schedule for work centers is generated by application of the Giffler and Thompson algorithm under four kind of priority hybrid dispatching rules. Then the clonal selection algorithm (CSA) is applied for the simultaneous scheduling to reduce backtracking as well as distance travel of AGVs within the FMS facility. The proposed procedure is computationally tested on the benchmark FMS configuration from the literature and findings from the investigations clearly indicates that the CSA yields best results in comparison of other applied methods from the literature.

  4. Mission scheduling

    NASA Technical Reports Server (NTRS)

    Gaspin, Christine

    1989-01-01

    How a neural network can work, compared to a hybrid system based on an operations research and artificial intelligence approach, is investigated through a mission scheduling problem. The characteristic features of each system are discussed.

  5. Emergency response nurse scheduling with medical support robot by multi-agent and fuzzy technique.

    PubMed

    Kono, Shinya; Kitamura, Akira

    2015-08-01

    In this paper, a new co-operative re-scheduling method corresponding the medical support tasks that the time of occurrence can not be predicted is described, assuming robot can co-operate medical activities with the nurse. Here, Multi-Agent-System (MAS) is used for the co-operative re-scheduling, in which Fuzzy-Contract-Net (FCN) is applied to the robots task assignment for the emergency tasks. As the simulation results, it is confirmed that the re-scheduling results by the proposed method can keep the patients satisfaction and decrease the work load of the nurse.

  6. Systematic Evaluation of Stochastic Methods in Power System Scheduling and Dispatch with Renewable Energy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Yishen; Zhou, Zhi; Liu, Cong

    2016-08-01

    As more wind power and other renewable resources are being integrated into the electric power grid, the forecast uncertainty brings operational challenges for the power system operators. In this report, different operational strategies for uncertainty management are presented and evaluated. A comprehensive and consistent simulation framework is developed to analyze the performance of different reserve policies and scheduling techniques under uncertainty in wind power. Numerical simulations are conducted on a modified version of the IEEE 118-bus system with a 20% wind penetration level, comparing deterministic, interval, and stochastic unit commitment strategies. The results show that stochastic unit commitment provides amore » reliable schedule without large increases in operational costs. Moreover, decomposition techniques, such as load shift factor and Benders decomposition, can help in overcoming the computational obstacles to stochastic unit commitment and enable the use of a larger scenario set to represent forecast uncertainty. In contrast, deterministic and interval unit commitment tend to give higher system costs as more reserves are being scheduled to address forecast uncertainty. However, these approaches require a much lower computational effort Choosing a proper lower bound for the forecast uncertainty is important for balancing reliability and system operational cost in deterministic and interval unit commitment. Finally, we find that the introduction of zonal reserve requirements improves reliability, but at the expense of higher operational costs.« less

  7. The Design of a Real Time Operating System for a Fault Tolerant Microcomputer

    DTIC Science & Technology

    1986-12-01

    Scheduler then enqueues all the new jobs for the new frame. Upon completion of the Purge and Task Scheduler routines the Cycle Interrupt Handler returns...the scheduling of new tasks in a new minor cycle to make room for the new jobs . The purge operation will usually not remove the same number of jobs each

  8. A Mechanized Decision Support System for Academic Scheduling.

    DTIC Science & Technology

    1986-03-01

    an operational system called software. The first step in the development phase is Design . Designers destribute software control by factoring the Data...SUBJECT TERMS (Continue on reverse if necessary and identify by block number) ELD GROUP SUB-GROUP Scheduling, Decision Support System , Software Design ...scheduling system . It will also examine software - design techniques to identify the most appropriate method- ology for this problem. " - Chapter 3 will

  9. What we were asked to do

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Recommendations are made after 32 interviews, lesson identification, lesson analysis, and mission characteristics identification. The major recommendations are as follows: (1) to develop end-to-end planning and scheduling operations concepts by mission class and to ensure their consideration in system life cycle documentation; (2) to create an organizational infrastructure at the Code 500 level, supported by a Directorate level steering committee with project representation, responsible for systems engineering of end-to-end planning and scheduling systems; (3) to develop and refine mission capabilities to assess impacts of early mission design decisions on planning and scheduling; and (4) to emphasize operational flexibility in the development of the Advanced Space Network, other institutional resources, external (e.g., project) capabilities and resources, operational software and support tools.

  10. Mission Planning and Scheduling System for NASA's Lunar Reconnaissance Mission

    NASA Technical Reports Server (NTRS)

    Garcia, Gonzalo; Barnoy, Assaf; Beech, Theresa; Saylor, Rick; Cosgrove, Jennifer Sager; Ritter, Sheila

    2009-01-01

    In the framework of NASA's return to the Moon efforts, the Lunar Reconnaissance Orbiter (LRO) is the first step. It is an unmanned mission to create a comprehensive atlas of the Moon's features and resources necessary to design and build a lunar outpost. LRO is scheduled for launch in April, 2009. LRO carries a payload comprised of six instruments and one technology demonstration. In addition to its scientific mission LRO will use new technologies, systems and flight operations concepts to reduce risk and increase productivity of future missions. As part of the effort to achieve robust and efficient operations, the LRO Mission Operations Team (MOT) will use its Mission Planning System (MPS) to manage the operational activities of the mission during the Lunar Orbit Insertion (LOI) and operational phases of the mission. The MPS, based on GMV's flexplan tool and developed for NASA with Honeywell Technology Solutions (prime contractor), will receive activity and slew maneuver requests from multiple science operations centers (SOC), as well as from the spacecraft engineers. flexplan will apply scheduling rules to all the requests received and will generate conflict free command schedules in the form of daily stored command loads for the orbiter and a set of daily pass scripts that help automate nominal real-time operations.

  11. Tug fleet and ground operations schedules and controls. Volume 2: part 1

    NASA Technical Reports Server (NTRS)

    1975-01-01

    This Tug Fleet and Ground Operations Schedules and Controls Study addresses both ground operational data and technical requirements that span the Tug planning phase and operations phase. A similar study covering mission operations (by others) provides the complimentary flight operations details. The two studies provide the planning data requirements, resource allocation, and control milestones for supporting the requirements of the STS program. This Tug Fleet and Ground Operations Schedules and Controls Study incorporates the basic ground operations requirements and concepts provided by previous studies with the interrelationships of the planning, IUS transition, and Tug fleet operations phases. The interrelationships of these phases were studied as a system to optimize overall program benefits and minimize operational risk factors.

  12. SMART operational field test evaluation : scheduler survey report : final report

    DOT National Transportation Integrated Search

    1997-06-01

    The Suburban Mobility Authority for Regional Transportation (SMART) has installed an automatic scheduling and dispatch system (ASD) in Southeast Michigan in accordance with their plans to implement ITS as a site for an operational field test. The pur...

  13. Chemotherapy and treatment scheduling: the Johns Hopkins Oncology Center Outpatient Department.

    PubMed Central

    Majidi, F.; Enterline, J. P.; Ashley, B.; Fowler, M. E.; Ogorzalek, L. L.; Gaudette, R.; Stuart, G. J.; Fulton, M.; Ettinger, D. S.

    1993-01-01

    The Chemotherapy and Treatment Scheduling System provides integrated appointment and facility scheduling for very complex procedures. It is fully integrated with other scheduling systems at The Johns Hopkins Oncology Center and is supported by the Oncology Clinical Information System (OCIS). It provides a combined visual and textual environment for the scheduling of events that have multiple dimensions and dependencies on other scheduled events. It is also fully integrated with other clinical decision support and ancillary systems within OCIS. The system has resulted in better patient flow through the ambulatory care areas of the Center. Implementing the system required changes in behavior among physicians, staff, and patients. This system provides a working example of building a sophisticated rule-based scheduling system using a relatively simple paradigm. It also is an example of what can be achieved when there is total integration between the operational and clinical components of patient care automation. PMID:8130453

  14. Linux Kernel Co-Scheduling For Bulk Synchronous Parallel Applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jones, Terry R

    2011-01-01

    This paper describes a kernel scheduling algorithm that is based on co-scheduling principles and that is intended for parallel applications running on 1000 cores or more where inter-node scalability is key. Experimental results for a Linux implementation on a Cray XT5 machine are presented.1 The results indicate that Linux is a suitable operating system for this new scheduling scheme, and that this design provides a dramatic improvement in scaling performance for synchronizing collective operations at scale.

  15. Proceedings of the Defense Nuclear Agency Conference on Arms Control and Verification Technology (ACT) Held in Williamsburg, Virginia on 1-4 June 1992

    DTIC Science & Technology

    1993-12-01

    operational schedules and overall mission costs. Several team members should be qualified to operate each item of equipment so the mission can proceed...establishing verified data exchange, scheduled on-site inspections of declared facilities and operation of a perimeter to portal monitoring system; (3...listed in Schedule 1, 2A, and 2B shall be subject to international monitoring. Each State Party also has the right to request an on-site challenge

  16. A new intuitionistic fuzzy rule-based decision-making system for an operating system process scheduler.

    PubMed

    Butt, Muhammad Arif; Akram, Muhammad

    2016-01-01

    We present a new intuitionistic fuzzy rule-based decision-making system based on intuitionistic fuzzy sets for a process scheduler of a batch operating system. Our proposed intuitionistic fuzzy scheduling algorithm, inputs the nice value and burst time of all available processes in the ready queue, intuitionistically fuzzify the input values, triggers appropriate rules of our intuitionistic fuzzy inference engine and finally calculates the dynamic priority (dp) of all the processes in the ready queue. Once the dp of every process is calculated the ready queue is sorted in decreasing order of dp of every process. The process with maximum dp value is sent to the central processing unit for execution. Finally, we show complete working of our algorithm on two different data sets and give comparisons with some standard non-preemptive process schedulers.

  17. A comprehensive approach to reactive power scheduling in restructured power systems

    NASA Astrophysics Data System (ADS)

    Shukla, Meera

    Financial constraints, regulatory pressure, and need for more economical power transfers have increased the loading of interconnected transmission systems. As a consequence, power systems have been operated close to their maximum power transfer capability limits, making the system more vulnerable to voltage instability events. The problem of voltage collapse characterized by a severe local voltage depression is generally believed to be associated with inadequate VAr support at key buses. The goal of reactive power planning is to maintain a high level of voltage security, through installation of properly sized and located reactive sources and their optimal scheduling. In case of vertically-operated power systems, the reactive requirement of the system is normally satisfied by using all of its reactive sources. But in case of different scenarios of restructured power systems, one may consider a fixed amount of exchange of reactive power through tie lines. Reviewed literature suggests a need for optimal scheduling of reactive power generation for fixed inter area reactive power exchange. The present work proposed a novel approach for reactive power source placement and a novel approach for its scheduling. The VAr source placement technique was based on the property of system connectivity. This is followed by development of optimal reactive power dispatch formulation which facilitated fixed inter area tie line reactive power exchange. This formulation used a Line Flow-Based (LFB) model of power flow analysis. The formulation determined the generation schedule for fixed inter area tie line reactive power exchange. Different operating scenarios were studied to analyze the impact of VAr management approach for vertically operated and restructured power systems. The system loadability, losses, generation and the cost of generation were the performance measures to study the impact of VAr management strategy. The novel approach was demonstrated on IEEE 30 bus system.

  18. Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

    NASA Technical Reports Server (NTRS)

    Richards, Stephen F.

    1991-01-01

    Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

  19. Expert systems tools for Hubble Space Telescope observation scheduling

    NASA Technical Reports Server (NTRS)

    Miller, Glenn; Rosenthal, Don; Cohen, William; Johnston, Mark

    1987-01-01

    The utility of expert systems techniques for the Hubble Space Telescope (HST) planning and scheduling is discussed and a plan for development of expert system tools which will augment the existing ground system is described. Additional capabilities provided by these tools will include graphics-oriented plan evaluation, long-range analysis of the observation pool, analysis of optimal scheduling time intervals, constructing sequences of spacecraft activities which minimize operational overhead, and optimization of linkages between observations. Initial prototyping of a scheduler used the Automated Reasoning Tool running on a LISP workstation.

  20. Application of multiobjective optimization to scheduling capacity expansion of urban water resource systems

    NASA Astrophysics Data System (ADS)

    Mortazavi-Naeini, Mohammad; Kuczera, George; Cui, Lijie

    2014-06-01

    Significant population increase in urban areas is likely to result in a deterioration of drought security and level of service provided by urban water resource systems. One way to cope with this is to optimally schedule the expansion of system resources. However, the high capital costs and environmental impacts associated with expanding or building major water infrastructure warrant the investigation of scheduling system operational options such as reservoir operating rules, demand reduction policies, and drought contingency plans, as a way of delaying or avoiding the expansion of water supply infrastructure. Traditionally, minimizing cost has been considered the primary objective in scheduling capacity expansion problems. In this paper, we consider some of the drawbacks of this approach. It is shown that there is no guarantee that the social burden of coping with drought emergencies is shared equitably across planning stages. In addition, it is shown that previous approaches do not adequately exploit the benefits of joint optimization of operational and infrastructure options and do not adequately address the need for the high level of drought security expected for urban systems. To address these shortcomings, a new multiobjective optimization approach to scheduling capacity expansion in an urban water resource system is presented and illustrated in a case study involving the bulk water supply system for Canberra. The results show that the multiobjective approach can address the temporal equity issue of sharing the burden of drought emergencies and that joint optimization of operational and infrastructure options can provide solutions superior to those just involving infrastructure options.

  1. Genetic algorithms applied to the scheduling of the Hubble Space Telescope

    NASA Technical Reports Server (NTRS)

    Sponsler, Jeffrey L.

    1989-01-01

    A prototype system employing a genetic algorithm (GA) has been developed to support the scheduling of the Hubble Space Telescope. A non-standard knowledge structure is used and appropriate genetic operators have been created. Several different crossover styles (random point selection, evolving points, and smart point selection) are tested and the best GA is compared with a neural network (NN) based optimizer. The smart crossover operator produces the best results and the GA system is able to evolve complete schedules using it. The GA is not as time-efficient as the NN system and the NN solutions tend to be better.

  2. APGEN Scheduling: 15 Years of Experience in Planning Automation

    NASA Technical Reports Server (NTRS)

    Maldague, Pierre F.; Wissler, Steve; Lenda, Matthew; Finnerty, Daniel

    2014-01-01

    In this paper, we discuss the scheduling capability of APGEN (Activity Plan Generator), a multi-mission planning application that is part of the NASA AMMOS (Advanced Multi- Mission Operations System), and how APGEN scheduling evolved over its applications to specific Space Missions. Our analysis identifies two major reasons for the successful application of APGEN scheduling to real problems: an expressive DSL (Domain-Specific Language) for formulating scheduling algorithms, and a well-defined process for enlisting the help of auxiliary modeling tools in providing high-fidelity, system-level simulations of the combined spacecraft and ground support system.

  3. Dynamic Routing for Delay-Tolerant Networking in Space Flight Operations

    NASA Technical Reports Server (NTRS)

    Burleigh, Scott C.

    2008-01-01

    Contact Graph Routing (CGR) is a dynamic routing system that computes routes through a time-varying topology composed of scheduled, bounded communication contacts in a network built on the Delay-Tolerant Networking (DTN) architecture. It is designed to support operations in a space network based on DTN, but it also could be used in terrestrial applications where operation according to a predefined schedule is preferable to opportunistic communication, as in a low-power sensor network. This paper will describe the operation of the CGR system and explain how it can enable data delivery over scheduled transmission opportunities, fully utilizing the available transmission capacity, without knowing the current state of any bundle protocol node (other than the local node itself) and without exhausting processing resources at any bundle router.

  4. Bioreactor design for successive culture of anchorage-dependent cells operated in an automated manner.

    PubMed

    Kino-Oka, Masahiro; Ogawa, Natsuki; Umegaki, Ryota; Taya, Masahito

    2005-01-01

    A novel bioreactor system was designed to perform a series of batchwise cultures of anchorage-dependent cells by means of automated operations of medium change and passage for cell transfer. The experimental data on contamination frequency ensured the biological cleanliness in the bioreactor system, which facilitated the operations in a closed environment, as compared with that in flask culture system with manual handlings. In addition, the tools for growth prediction (based on growth kinetics) and real-time growth monitoring by measurement of medium components (based on small-volume analyzing machinery) were installed into the bioreactor system to schedule the operations of medium change and passage and to confirm that culture proceeds as scheduled, respectively. The successive culture of anchorage-dependent cells was conducted with the bioreactor running in an automated way. The automated bioreactor gave a successful culture performance with fair accordance to preset scheduling based on the information in the latest subculture, realizing 79- fold cell expansion for 169 h. In addition, the correlation factor between experimental data and scheduled values through the bioreactor performance was 0.998. It was concluded that the proposed bioreactor with the integration of the prediction and monitoring tools could offer a feasible system for the manufacturing process of cultured tissue products.

  5. The Transition from VMS to Unix Operations for STScI's Science Planning and Scheduling Team

    NASA Astrophysics Data System (ADS)

    Adler, D. S.; Taylor, D. K.

    The Science Planning and Scheduling Team of the Space Telescope Science Institute currently uses the VMS operating system. SPST began a transition to Unix-based operations in the summer of 1999. The main tasks for SPST to address in the Unix transition are: (1) converting the current SPST operational tools from DCL to Python; (2) converting our database report scripts from SQL; (3) adopting a Unix-based code management system; and (4) training the SPST staff. The goal is to fully transition the team to Unix operations by the end of 2001.

  6. Laboratory services series: a programmed maintenance system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tuxbury, D.C.; Srite, B.E.

    1980-01-01

    The diverse facilities, operations and equipment at a major national research and development laboratory require a systematic, analytical approach to operating equipment maintenance. A computer-scheduled preventive maintenance program is described including program development, equipment identification, maintenance and inspection instructions, scheduling, personnel, and equipment history.

  7. Photovoltaic system criteria documents. Volume 1: Guidelines for evaluating the management and operations planning of photovoltaic applications

    NASA Technical Reports Server (NTRS)

    Koenig, John C.; Billitti, Joseph W.; Tallon, John M.

    1979-01-01

    Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).

  8. Efficient operation scheduling for adsorption chillers using predictive optimization-based control methods

    NASA Astrophysics Data System (ADS)

    Bürger, Adrian; Sawant, Parantapa; Bohlayer, Markus; Altmann-Dieses, Angelika; Braun, Marco; Diehl, Moritz

    2017-10-01

    Within this work, the benefits of using predictive control methods for the operation of Adsorption Cooling Machines (ACMs) are shown on a simulation study. Since the internal control decisions of series-manufactured ACMs often cannot be influenced, the work focuses on optimized scheduling of an ACM considering its internal functioning as well as forecasts for load and driving energy occurrence. For illustration, an assumed solar thermal climate system is introduced and a system model suitable for use within gradient-based optimization methods is developed. The results of a system simulation using a conventional scheme for ACM scheduling are compared to the results of a predictive, optimization-based scheduling approach for the same exemplary scenario of load and driving energy occurrence. The benefits of the latter approach are shown and future actions for application of these methods for system control are addressed.

  9. Testing Task Schedulers on Linux System

    NASA Astrophysics Data System (ADS)

    Jelenković, Leonardo; Groš, Stjepan; Jakobović, Domagoj

    Testing task schedulers on Linux operating system proves to be a challenging task. There are two main problems. The first one is to identify which properties of the scheduler to test. The second problem is how to perform it, e.g., which API to use that is sufficiently precise and in the same time supported on most platforms. This paper discusses the problems in realizing test framework for testing task schedulers and presents one potential solution. Observed behavior of the scheduler is the one used for “normal” task scheduling (SCHED_OTHER), unlike one used for real-time tasks (SCHED_FIFO, SCHED_RR).

  10. Maximally Expressive Task Modeling

    NASA Technical Reports Server (NTRS)

    Japp, John; Davis, Elizabeth; Maxwell, Theresa G. (Technical Monitor)

    2002-01-01

    Planning and scheduling systems organize "tasks" into a timeline or schedule. The tasks are defined within the scheduling system in logical containers called models. The dictionary might define a model of this type as "a system of things and relations satisfying a set of rules that, when applied to the things and relations, produce certainty about the tasks that are being modeled." One challenging domain for a planning and scheduling system is the operation of on-board experiment activities for the Space Station. The equipment used in these experiments is some of the most complex hardware ever developed by mankind, the information sought by these experiments is at the cutting edge of scientific endeavor, and the procedures for executing the experiments are intricate and exacting. Scheduling is made more difficult by a scarcity of space station resources. The models to be fed into the scheduler must describe both the complexity of the experiments and procedures (to ensure a valid schedule) and the flexibilities of the procedures and the equipment (to effectively utilize available resources). Clearly, scheduling space station experiment operations calls for a "maximally expressive" modeling schema. Modeling even the simplest of activities cannot be automated; no sensor can be attached to a piece of equipment that can discern how to use that piece of equipment; no camera can quantify how to operate a piece of equipment. Modeling is a human enterprise-both an art and a science. The modeling schema should allow the models to flow from the keyboard of the user as easily as works of literature flowed from the pen of Shakespeare. The Ground Systems Department at the Marshall Space Flight Center has embarked on an effort to develop a new scheduling engine that is highlighted by a maximally expressive modeling schema. This schema, presented in this paper, is a synergy of technological advances and domain-specific innovations.

  11. NASA's Software Bank (CLIPS)

    NASA Technical Reports Server (NTRS)

    1992-01-01

    C Language Integrated Production System (CLIPS) was used by Esse Systems to develop an expert system for clients who want to automate portions of their operations. The resulting program acts as a scheduling expert and automates routine, repetitive scheduling decisions, allowing employees to spend time on more creative projects.

  12. Real-time contingency handling in MAESTRO

    NASA Technical Reports Server (NTRS)

    Britt, Daniel L.; Geoffroy, Amy L.

    1992-01-01

    A scheduling and resource management system named MAESTRO was interfaced with a Space Station Module Power Management and Distribution (SSM/PMAD) breadboard at MSFC. The combined system serves to illustrate the integration of planning, scheduling, and control in a realistic, complex domain. This paper briefly describes the functional elements of the combined system, including normal and contingency operational scenarios, then focusses on the method used by the scheduler to handle real-time contingencies.

  13. Charge scheduling of an energy storage system under time-of-use pricing and a demand charge.

    PubMed

    Yoon, Yourim; Kim, Yong-Hyuk

    2014-01-01

    A real-coded genetic algorithm is used to schedule the charging of an energy storage system (ESS), operated in tandem with renewable power by an electricity consumer who is subject to time-of-use pricing and a demand charge. Simulations based on load and generation profiles of typical residential customers show that an ESS scheduled by our algorithm can reduce electricity costs by approximately 17%, compared to a system without an ESS and by 8% compared to a scheduling algorithm based on net power.

  14. Charge Scheduling of an Energy Storage System under Time-of-Use Pricing and a Demand Charge

    PubMed Central

    Yoon, Yourim

    2014-01-01

    A real-coded genetic algorithm is used to schedule the charging of an energy storage system (ESS), operated in tandem with renewable power by an electricity consumer who is subject to time-of-use pricing and a demand charge. Simulations based on load and generation profiles of typical residential customers show that an ESS scheduled by our algorithm can reduce electricity costs by approximately 17%, compared to a system without an ESS and by 8% compared to a scheduling algorithm based on net power. PMID:25197720

  15. An FMS Dynamic Production Scheduling Algorithm Considering Cutting Tool Failure and Cutting Tool Life

    NASA Astrophysics Data System (ADS)

    Setiawan, A.; Wangsaputra, R.; Martawirya, Y. Y.; Halim, A. H.

    2016-02-01

    This paper deals with Flexible Manufacturing System (FMS) production rescheduling due to unavailability of cutting tools caused either of cutting tool failure or life time limit. The FMS consists of parallel identical machines integrated with an automatic material handling system and it runs fully automatically. Each machine has a same cutting tool configuration that consists of different geometrical cutting tool types on each tool magazine. The job usually takes two stages. Each stage has sequential operations allocated to machines considering the cutting tool life. In the real situation, the cutting tool can fail before the cutting tool life is reached. The objective in this paper is to develop a dynamic scheduling algorithm when a cutting tool is broken during unmanned and a rescheduling needed. The algorithm consists of four steps. The first step is generating initial schedule, the second step is determination the cutting tool failure time, the third step is determination of system status at cutting tool failure time and the fourth step is the rescheduling for unfinished jobs. The approaches to solve the problem are complete-reactive scheduling and robust-proactive scheduling. The new schedules result differences starting time and completion time of each operations from the initial schedule.

  16. Coordination of appointments for anesthesia care outside of operating rooms using an enterprise-wide scheduling system.

    PubMed

    Dexter, Franklin; Xiao, Yan; Dow, Angella J; Strader, Melissa M; Ho, Danny; Wachtel, Ruth E

    2007-12-01

    An anesthesia department implemented scheduling of anesthetics outside of operating rooms (non-OR) by clerks and nurses from other departments using its hospital's enterprise-wide scheduling system. Observational studies chronicled the change over 2 yr as non-OR time was allocated by specialty, and nonanesthesia clerks and nurses scheduled anesthesia teams. Experimental studies investigated how tabular and graphical displays affected the scheduling of milestones (e.g., NPO times) and appointments before anesthetics. Anesthetics performed in allocated time increased progressively from 0% to 75%. Scheduling of anesthetics by nonanesthesia clerks and nurses increased progressively from 0% to 77%. Consistency of patient instructions was improved. The quality of resulting schedules was good. Implementation was not associated with worsening of multiple operational measures of performance such as cancellation rates, turnover times, or complaints. However, schedulers struggled to understand fasting and arrival times of patients, despite using a web site with statistically generated values in tabular formats. Experiments revealed that people ignored their knowledge that anesthetics can start earlier than scheduled. Participants made good decisions with both tabular and graphical displays when scheduling appointments preceding anesthesia. Enterprise-wide scheduling can coordinate anesthetics with other appointments on the same date and improve consistency and accuracy of patient instructions customized to the probability of an anesthetic starting early. The usefulness of implementation depends on the value in having more patient-centered care and/or in having patients arrive just in time for non-OR anesthesia, surgery, or regional block placement (e.g., at facilities with limited physical space).

  17. Linux Kernel Co-Scheduling and Bulk Synchronous Parallelism

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jones, Terry R

    2012-01-01

    This paper describes a kernel scheduling algorithm that is based on coscheduling principles and that is intended for parallel applications running on 1000 cores or more. Experimental results for a Linux implementation on a Cray XT5 machine are presented. The results indicate that Linux is a suitable operating system for this new scheduling scheme, and that this design provides a dramatic improvement in scaling performance for synchronizing collective operations at scale.

  18. 76 FR 79676 - California Independent System Operator Corporation; Supplemental Notice of Agenda and Discussion...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ... Operator Corporation's (CAISO) proposal to eliminate convergence bidding at intertie scheduling points.\\1... proposal to eliminate convergence bidding at intertie scheduling points in detail. No formal presentations... 1973. For accessibility accommodations please send an email to [email protected] or call toll free...

  19. Vehicle management and mission planning systems with shuttle applications

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A preliminary definition of a concept for an automated system is presented that will support the effective management and planning of space shuttle operations. It is called the Vehicle Management and Mission Planning System (VMMPS). In addition to defining the system and its functions, some of the software requirements of the system are identified and a phased and evolutionary method is recommended for software design, development, and implementation. The concept is composed of eight software subsystems supervised by an executive system. These subsystems are mission design and analysis, flight scheduler, launch operations, vehicle operations, payload support operations, crew support, information management, and flight operations support. In addition to presenting the proposed system, a discussion of the evolutionary software development philosophy that the Mission Planning and Analysis Division (MPAD) would propose to use in developing the required supporting software is included. A preliminary software development schedule is also included.

  20. Utilizing GIS to evaluate base schedules in paratransit operations

    DOT National Transportation Integrated Search

    1999-02-02

    With ready access to street file names and inexpensive GIS software, paratransit systems can take advantage of GIS technology to evaluate base schedules on a regular basis in order to maintain system efficiency at consistently high levels. This proje...

  1. The MSG Central Facility - A Mission Control System for Windows NT

    NASA Astrophysics Data System (ADS)

    Thompson, R.

    The MSG Central Facility, being developed by Science Systems for EUMETSAT1, represents the first of a new generation of satellite mission control systems, based on the Windows NT operating system. The system makes use of a range of new technologies to provide an integrated environment for the planning, scheduling, control and monitoring of the entire Meteosat Second Generation mission. It supports packetised TM/TC and uses Science System's Space UNiT product to provide automated operations support at both Schedule (Timeline) and Procedure levels. Flexible access to historical data is provided through an operations archive based on ORACLE Enterprise Server, hosted on a large RAID array and off-line tape jukebox. Event driven real-time data distribution is based on the CORBA standard. Operations preparation and configuration control tools form a fully integrated element of the system.

  2. Optimization-based manufacturing scheduling with multiple resources and setup requirements

    NASA Astrophysics Data System (ADS)

    Chen, Dong; Luh, Peter B.; Thakur, Lakshman S.; Moreno, Jack, Jr.

    1998-10-01

    The increasing demand for on-time delivery and low price forces manufacturer to seek effective schedules to improve coordination of multiple resources and to reduce product internal costs associated with labor, setup and inventory. This study describes the design and implementation of a scheduling system for J. M. Product Inc. whose manufacturing is characterized by the need to simultaneously consider machines and operators while an operator may attend several operations at the same time, and the presence of machines requiring significant setup times. The scheduling problem with these characteristics are typical for many manufacturers, very difficult to be handled, and have not been adequately addressed in the literature. In this study, both machine and operators are modeled as resources with finite capacities to obtain efficient coordination between them, and an operator's time can be shared by several operations at the same time to make full use of the operator. Setups are explicitly modeled following our previous work, with additional penalties on excessive setups to reduce setup costs and avoid possible scraps. An integer formulation with a separable structure is developed to maximize on-time delivery of products, low inventory and small number of setups. Within the Lagrangian relaxation framework, the problem is decomposed into individual subproblems that are effectively solved by using dynamic programming with additional penalties embedded in state transitions. Heuristics is then developed to obtain a feasible schedule following on our previous work with new mechanism to satisfy operator capacity constraints. The method has been implemented using the object-oriented programming language C++ with a user-friendly interface, and numerical testing shows that the method generates high quality schedules in a timely fashion. Through simultaneous consideration of machines and operators, machines and operators are well coordinated to facilitate the smooth flow of parts through the system. The explicit modeling of setups and the associated penalties let parts with same setup requirements clustered together to avoid excessive setups.

  3. Reservoir system expansion scheduling under conflicting interests - A Blue Nile application

    NASA Astrophysics Data System (ADS)

    Geressu, Robel; Harou, Julien

    2017-04-01

    New water resource developments are facing increasing resistance due to their real and perceived potential to affect existing systems' performance negatively. Hence, scheduling new dams in multi-reservoir systems requires considering conflicting performance objectives to minimize impacts, create consensus among wider stakeholder groups and avoid conflict. However, because of the large number of alternative expansion schedules, planning approaches often rely on simplifying assumptions such as the appropriate gap between expansion stages or less flexibility in reservoir release rules than what is possible. In this study, we investigate the extent to which these assumptions could limit our ability to find better performing alternatives. We apply a many-objective sequencing approach to the proposed Blue Nile hydropower reservoir system in Ethiopia to find best investment schedules and operating rules that maximize long-term discounted net benefits, downstream releases and energy generation during reservoir filling periods. The system is optimized using 30 realizations of stochastically generated streamflow data, statistically resembling the historical flow. Results take the form of Pareto-optimal trade-offs where each point on the curve or surface represents a combination of new reservoirs, their implementation dates and operating rules. Results show a significant relationship between detail in operating rule design (i.e., changing operating rules as the multi-reservoir expansion progresses) and the system performance. For the Blue Nile, failure to optimize operating rules in sufficient detail could result in underestimation of the net worth of the proposed investments by up to 6 billion USD if a development option with low downstream impact (slow filling of the reservoirs) is to be implemented.

  4. Production scheduling with discrete and renewable additional resources

    NASA Astrophysics Data System (ADS)

    Kalinowski, K.; Grabowik, C.; Paprocka, I.; Kempa, W.

    2015-11-01

    In this paper an approach to planning of additional resources when scheduling operations are discussed. The considered resources are assumed to be discrete and renewable. In most research in scheduling domain, the basic and often the only type of regarded resources is a workstation. It can be understood as a machine, a device or even as a separated space on the shop floor. In many cases, during the detailed scheduling of operations the need of using more than one resource, required for its implementation, can be indicated. Resource requirements for an operation may relate to different resources or resources of the same type. Additional resources are most often referred to these human resources, tools or equipment, for which the limited availability in the manufacturing system may have an influence on the execution dates of some operations. In the paper the concept of the division into basic and additional resources and their planning method was shown. A situation in which sets of basic and additional resources are not separable - the same additional resource may be a basic resource for another operation is also considered. Scheduling of operations, including greater amount of resources can cause many difficulties, depending on whether the resource is involved in the entire time of operation, only in the selected part(s) of operation (e.g. as auxiliary staff at setup time) or cyclic - e.g. when an operator supports more than one machine, or supervises the execution of several operations. For this reason the dates and work times of resources participation in the operation can be different. Presented issues are crucial when modelling of production scheduling environment and designing of structures for the purpose of scheduling software development.

  5. Airspace Technology Demonstration 2 (ATD-2) Technology Description Document (TDD)

    NASA Technical Reports Server (NTRS)

    Ging, Andrew; Engelland, Shawn; Capps, Al; Eshow, Michelle; Jung, Yoon; Sharma, Shivanjli; Talebi, Ehsan; Downs, Michael; Freedman, Cynthia; Ngo, Tyler; hide

    2018-01-01

    This Technology Description Document (TDD) provides an overview of the technology for the Phase 1 Baseline Integrated Arrival, Departure, and Surface (IADS) prototype system of the National Aeronautics and Space Administration's (NASA) Airspace Technology Demonstration 2 (ATD-2) project, to be demonstrated beginning in 2017 at Charlotte Douglas International Airport (CLT). Development, integration, and field demonstration of relevant technologies of the IADS system directly address recommendations made by the Next Generation Air Transportation System (NextGen) Integration Working Group (NIWG) on Surface and Data Sharing and the Surface Collaborative Decision Making (Surface CDM) concept of operations developed jointly by the Federal Aviation Administration (FAA) and aviation industry partners. NASA is developing the IADS traffic management system under the ATD-2 project in coordination with the FAA, flight operators, CLT airport, and the National Air Traffic Controllers Association (NATCA). The primary goal of ATD-2 is to improve the predictability and operational efficiency of the air traffic system in metroplex environments, through the enhancement, development, and integration of the nation's most advanced and sophisticated arrival, departure, and surface prediction, scheduling, and management systems. The ATD-2 project is a 5-year research activity beginning in 2015 and extending through 2020. The Phase 1 Baseline IADS capability resulting from the ATD-2 research will be demonstrated at the CLT airport beginning in 2017. Phase 1 will provide the initial demonstration of the integrated system with strategic and tactical scheduling, tactical departure scheduling to an en route meter point, and an early implementation prototype of a Terminal Flight Data Manager (TFDM) Electronic Flight Data (EFD) system. The strategic surface scheduling element of the capability is consistent with the Surface CDM Concept of Operations published in 2014 by the FAA Surface Operations Directorate.

  6. [Influence of work intensity on development of arterial hypertension in metal-mining workers].

    PubMed

    Ustinova, O Iu; Alekseev, V B; Rumiantseva, A N; Orehova, Ia V

    2013-01-01

    The article covers data on influence of working shifts duration and shift work intensity on cardiovascular system functioning in operators of mining excavators. Findings are that 8 hours shift with regular shift schedule (40 working hours per week) gives significant load on cardiovascular system of workers engaged into underground activities. 50% of mining excavator operators following this working schedule develop transitory arterial hypertension within 10 years. Longer work shift over 8 hours and more intensive shifting schedule over 40 hours per week causes stable arterial hypertension within 3 months in 60% of workers, in 10% of cases associated with lower functioning of sinus node.

  7. Design and implementation of an experiment scheduling system for the ACTS satellite

    NASA Technical Reports Server (NTRS)

    Ringer, Mark J.

    1994-01-01

    The Advanced Communication Technology Satellite (ACTS) was launched on the 12th of September 1993 aboard STS-51. All events since that time have proceeded as planned with user operations commencing on December 6th, 1993. ACTS is a geosynchronous satellite designed to extend the state of the art in communication satellite design and is available to experimenters on a 'time/bandwidth available' basis. The ACTS satellite requires the advance scheduling of experimental activities based upon a complex set of resource, state, and activity constraints in order to ensure smooth operations. This paper describes the software system developed to schedule experiments for ACTS.

  8. Analysis and design of gain scheduled control systems. Ph.D. Thesis

    NASA Technical Reports Server (NTRS)

    Shamma, Jeff S.

    1988-01-01

    Gain scheduling, as an idea, is to construct a global feedback control system for a time varying and/or nonlinear plant from a collection of local time invariant designs. However in the absence of a sound analysis, these designs come with no guarantees on the robustness, performance, or even nominal stability of the overall gain schedule design. Such an analysis is presented for three types of gain scheduling situations: (1) a linear parameter varying plant scheduling on its exogenous parameters, (2) a nonlinear plant scheduling on a prescribed reference trajectory, and (3) a nonlinear plant scheduling on the current plant output. Conditions are given which guarantee that the stability, robustness, and performance properties of the fixed operating point designs carry over to the global gain scheduled designs, such as the scheduling variable should vary slowly and capture the plants nonlinearities. Finally, an alternate design framework is proposed which removes the slowing varying restriction or gain scheduled systems. This framework addresses some fundamental feedback issues previously ignored in standard gain.

  9. The key to successful management of STS operations: An integrated production planning system

    NASA Technical Reports Server (NTRS)

    Johnson, W. A.; Thomasen, C. T.

    1985-01-01

    Space Transportation System operations managers are being confronted with a unique set of challenges as a result of increasing flight rates, the demand for flight manifest/production schedule flexibility and an emphasis on continued cost reduction. These challenges have created the need for an integrated production planning system that provides managers with the capability to plan, schedule, status and account for an orderly flow of products and services across a large, multi-discipline organization. With increased visibility into the end-to-end production flow for individual and parallel missions in process, managers can assess the integrated impact of changes, identify and measure the interrelationships of resource, schedule, and technical performance requirements and prioritize productivity enhancements.

  10. A Method for Optimal Load Dispatch of a Multi-zone Power System with Zonal Exchange Constraints

    NASA Astrophysics Data System (ADS)

    Hazarika, Durlav; Das, Ranjay

    2018-04-01

    This paper presented a method for economic generation scheduling of a multi-zone power system having inter zonal operational constraints. For this purpose, the generator rescheduling for a multi area power system having inter zonal operational constraints has been represented as a two step optimal generation scheduling problem. At first, the optimal generation scheduling has been carried out for the zone having surplus or deficient generation with proper spinning reserve using co-ordination equation. The power exchange required for the deficit zones and zones having no generation are estimated based on load demand and generation for the zone. The incremental transmission loss formulas for the transmission lines participating in the power transfer process among the zones are formulated. Using these, incremental transmission loss expression in co-ordination equation, the optimal generation scheduling for the zonal exchange has been determined. Simulation is carried out on IEEE 118 bus test system to examine the applicability and validity of the method.

  11. Comprehensive Anti-error Study on Power Grid Dispatching Based on Regional Regulation and Integration

    NASA Astrophysics Data System (ADS)

    Zhang, Yunju; Chen, Zhongyi; Guo, Ming; Lin, Shunsheng; Yan, Yinyang

    2018-01-01

    With the large capacity of the power system, the development trend of the large unit and the high voltage, the scheduling operation is becoming more frequent and complicated, and the probability of operation error increases. This paper aims at the problem of the lack of anti-error function, single scheduling function and low working efficiency for technical support system in regional regulation and integration, the integrated construction of the error prevention of the integrated architecture of the system of dispatching anti - error of dispatching anti - error of power network based on cloud computing has been proposed. Integrated system of error prevention of Energy Management System, EMS, and Operation Management System, OMS have been constructed either. The system architecture has good scalability and adaptability, which can improve the computational efficiency, reduce the cost of system operation and maintenance, enhance the ability of regional regulation and anti-error checking with broad development prospects.

  12. SLS-PLAN-IT: A knowledge-based blackboard scheduling system for Spacelab life sciences missions

    NASA Technical Reports Server (NTRS)

    Kao, Cheng-Yan; Lee, Seok-Hua

    1992-01-01

    The primary scheduling tool in use during the Spacelab Life Science (SLS-1) planning phase was the operations research (OR) based, tabular form Experiment Scheduling System (ESS) developed by NASA Marshall. PLAN-IT is an artificial intelligence based interactive graphic timeline editor for ESS developed by JPL. The PLAN-IT software was enhanced for use in the scheduling of Spacelab experiments to support the SLS missions. The enhanced software SLS-PLAN-IT System was used to support the real-time reactive scheduling task during the SLS-1 mission. SLS-PLAN-IT is a frame-based blackboard scheduling shell which, from scheduling input, creates resource-requiring event duration objects and resource-usage duration objects. The blackboard structure is to keep track of the effects of event duration objects on the resource usage objects. Various scheduling heuristics are coded in procedural form and can be invoked any time at the user's request. The system architecture is described along with what has been learned with the SLS-PLAN-IT project.

  13. EOS Operations Systems: EDOS Implemented Changes to Reduce Operations Costs

    NASA Technical Reports Server (NTRS)

    Cordier, Guy R.; Gomez-Rosa, Carlos; McLemore, Bruce D.

    2007-01-01

    The authors describe in this paper the progress achieved to-date with the reengineering of the Earth Observing System (EOS) Data and Operations System (EDOS), the experience gained in the process and the ensuing reduction of ground systems operations costs. The reengineering effort included a major methodology change, applying to an existing schedule driven system, a data-driven system approach.

  14. Application of the Software as a Service Model to the Control of Complex Building Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stadler, Michael; Donadee, Jonathan; Marnay, Chris

    2011-03-17

    In an effort to create broad access to its optimization software, Lawrence Berkeley National Laboratory (LBNL), in collaboration with the University of California at Davis (UC Davis) and OSISoft, has recently developed a Software as a Service (SaaS) Model for reducing energy costs, cutting peak power demand, and reducing carbon emissions for multipurpose buildings. UC Davis currently collects and stores energy usage data from buildings on its campus. Researchers at LBNL sought to demonstrate that a SaaS application architecture could be built on top of this data system to optimize the scheduling of electricity and heat delivery in the building.more » The SaaS interface, known as WebOpt, consists of two major parts: a) the investment& planning and b) the operations module, which builds on the investment& planning module. The operational scheduling and load shifting optimization models within the operations module use data from load prediction and electrical grid emissions models to create an optimal operating schedule for the next week, reducing peak electricity consumption while maintaining quality of energy services. LBNL's application also provides facility managers with suggested energy infrastructure investments for achieving their energy cost and emission goals based on historical data collected with OSISoft's system. This paper describes these models as well as the SaaS architecture employed by LBNL researchers to provide asset scheduling services to UC Davis. The peak demand, emissions, and cost implications of the asset operation schedule and investments suggested by this optimization model are analysed.« less

  15. Application of the Software as a Service Model to the Control of Complex Building Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stadler, Michael; Donadee, Jon; Marnay, Chris

    2011-03-18

    In an effort to create broad access to its optimization software, Lawrence Berkeley National Laboratory (LBNL), in collaboration with the University of California at Davis (UC Davis) and OSISoft, has recently developed a Software as a Service (SaaS) Model for reducing energy costs, cutting peak power demand, and reducing carbon emissions for multipurpose buildings. UC Davis currently collects and stores energy usage data from buildings on its campus. Researchers at LBNL sought to demonstrate that a SaaS application architecture could be built on top of this data system to optimize the scheduling of electricity and heat delivery in the building.more » The SaaS interface, known as WebOpt, consists of two major parts: a) the investment& planning and b) the operations module, which builds on the investment& planning module. The operational scheduling and load shifting optimization models within the operations module use data from load prediction and electrical grid emissions models to create an optimal operating schedule for the next week, reducing peak electricity consumption while maintaining quality of energy services. LBNL's application also provides facility managers with suggested energy infrastructure investments for achieving their energy cost and emission goals based on historical data collected with OSISoft's system. This paper describes these models as well as the SaaS architecture employed by LBNL researchers to provide asset scheduling services to UC Davis. The peak demand, emissions, and cost implications of the asset operation schedule and investments suggested by this optimization model are analyzed.« less

  16. A scheduling and diagnostic system for scientific satellite GEOTAIL using expert system

    NASA Technical Reports Server (NTRS)

    Nakatani, I; Hashimoto, M.; Mukai, T.; Obara, T.; Nishigori, N.

    1994-01-01

    The Intelligent Satellite Control Software (ISACS) for the geoMagnetic tail observation satellite named GEOTAIL (launched in July 1992) has been successfully developed. ISACS has made it possible by applying Artificial Intelligence (AI) technology including an expert system to autonomously generate a tracking schedule, which originally used to be conducted manually. Using ISACS, a satellite operator can generate a maximum four day period of stored command stream autonomously and can easily confirm its safety. The ISACS system has another function -- to diagnose satellite troubles and to suggest necessary remedies. The workload of satellite operators has drastically been reduced since ISACS has been introduced into the operations of GEOTAIL.

  17. Systemic delay propagation in the US airport network

    PubMed Central

    Fleurquin, Pablo; Ramasco, José J.; Eguiluz, Victor M.

    2013-01-01

    Technologically driven transport systems are characterized by a networked structure connecting operation centers and by a dynamics ruled by pre-established schedules. Schedules impose serious constraints on the timing of the operations, condition the allocation of resources and define a baseline to assess system performance. Here we study the performance of an air transportation system in terms of delays. Technical, operational or meteorological issues affecting some flights give rise to primary delays. When operations continue, such delays can propagate, magnify and eventually involve a significant part of the network. We define metrics able to quantify the level of network congestion and introduce a model that reproduces the delay propagation patterns observed in the U.S. performance data. Our results indicate that there is a non-negligible risk of systemic instability even under normal operating conditions. We also identify passenger and crew connectivity as the most relevant internal factor contributing to delay spreading. PMID:23362459

  18. Online Optimization Method for Operation of Generators in a Micro Grid

    NASA Astrophysics Data System (ADS)

    Hayashi, Yasuhiro; Miyamoto, Hideki; Matsuki, Junya; Iizuka, Toshio; Azuma, Hitoshi

    Recently a lot of studies and developments about distributed generator such as photovoltaic generation system, wind turbine generation system and fuel cell have been performed under the background of the global environment issues and deregulation of the electricity market, and the technique of these distributed generators have progressed. Especially, micro grid which consists of several distributed generators, loads and storage battery is expected as one of the new operation system of distributed generator. However, since precipitous load fluctuation occurs in micro grid for the reason of its smaller capacity compared with conventional power system, high-accuracy load forecasting and control scheme to balance of supply and demand are needed. Namely, it is necessary to improve the precision of operation in micro grid by observing load fluctuation and correcting start-stop schedule and output of generators online. But it is not easy to determine the operation schedule of each generator in short time, because the problem to determine start-up, shut-down and output of each generator in micro grid is a mixed integer programming problem. In this paper, the authors propose an online optimization method for the optimal operation schedule of generators in micro grid. The proposed method is based on enumeration method and particle swarm optimization (PSO). In the proposed method, after picking up all unit commitment patterns of each generators satisfied with minimum up time and minimum down time constraint by using enumeration method, optimal schedule and output of generators are determined under the other operational constraints by using PSO. Numerical simulation is carried out for a micro grid model with five generators and photovoltaic generation system in order to examine the validity of the proposed method.

  19. A System for Planning Ahead

    NASA Technical Reports Server (NTRS)

    2002-01-01

    A software system that uses artificial intelligence techniques to help with complex Space Shuttle scheduling at Kennedy Space Center is commercially available. Stottler Henke Associates, Inc.(SHAI), is marketing its automatic scheduling system, the Automated Manifest Planner (AMP), to industries that must plan and project changes many different times before the tasks are executed. The system creates optimal schedules while reducing manpower costs. Using information entered into the system by expert planners, the system automatically makes scheduling decisions based upon resource limitations and other constraints. It provides a constraint authoring system for adding other constraints to the scheduling process as needed. AMP is adaptable to assist with a variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction. AMP can benefit vehicle assembly plants, batch processing plants, semiconductor manufacturing, printing and textiles, surface and underground mining operations, and maintenance shops. For most of SHAI's commercial sales, the company obtains a service contract to customize AMP to a specific domain and then issues the customer a user license.

  20. NASDA knowledge-based network planning system

    NASA Technical Reports Server (NTRS)

    Yamaya, K.; Fujiwara, M.; Kosugi, S.; Yambe, M.; Ohmori, M.

    1993-01-01

    One of the SODS (space operation and data system) sub-systems, NP (network planning) was the first expert system used by NASDA (national space development agency of Japan) for tracking and control of satellite. The major responsibilities of the NP system are: first, the allocation of network and satellite control resources and, second, the generation of the network operation plan data (NOP) used in automated control of the stations and control center facilities. Up to now, the first task of network resource scheduling was done by network operators. NP system automatically generates schedules using its knowledge base, which contains information on satellite orbits, station availability, which computer is dedicated to which satellite, and how many stations must be available for a particular satellite pass or a certain time period. The NP system is introduced.

  1. Scheduling elective surgeries: the tradeoff among bed capacity, waiting patients and operating room utilization using goal programming.

    PubMed

    Li, Xiangyong; Rafaliya, N; Baki, M Fazle; Chaouch, Ben A

    2017-03-01

    Scheduling of surgeries in the operating rooms under limited competing resources such as surgical and nursing staff, anesthesiologist, medical equipment, and recovery beds in surgical wards is a complicated process. A well-designed schedule should be concerned with the welfare of the entire system by allocating the available resources in an efficient and effective manner. In this paper, we develop an integer linear programming model in a manner useful for multiple goals for optimally scheduling elective surgeries based on the availability of surgeons and operating rooms over a time horizon. In particular, the model is concerned with the minimization of the following important goals: (1) the anticipated number of patients waiting for service; (2) the underutilization of operating room time; (3) the maximum expected number of patients in the recovery unit; and (4) the expected range (the difference between maximum and minimum expected number) of patients in the recovery unit. We develop two goal programming (GP) models: lexicographic GP model and weighted GP model. The lexicographic GP model schedules operating rooms when various preemptive priority levels are given to these four goals. A numerical study is conducted to illustrate the optimal master-surgery schedule obtained from the models. The numerical results demonstrate that when the available number of surgeons and operating rooms is known without error over the planning horizon, the proposed models can produce good schedules and priority levels and preference weights of four goals affect the resulting schedules. The results quantify the tradeoffs that must take place as the preemptive-weights of the four goals are changed.

  2. An expert system for planning and scheduling in a telerobotic environment

    NASA Technical Reports Server (NTRS)

    Ntuen, Celestine A.; Park, Eui H.

    1991-01-01

    A knowledge based approach to assigning tasks to multi-agents working cooperatively in jobs that require a telerobot in the loop was developed. The generality of the approach allows for such a concept to be applied in a nonteleoperational domain. The planning architecture known as the task oriented planner (TOP) uses the principle of flow mechanism and the concept of planning by deliberation to preserve and use knowledge about a particular task. The TOP is an open ended architecture developed with a NEXPERT expert system shell and its knowledge organization allows for indirect consultation at various levels of task abstraction. Considering that a telerobot operates in a hostile and nonstructured environment, task scheduling should respond to environmental changes. A general heuristic was developed for scheduling jobs with the TOP system. The technique is not to optimize a given scheduling criterion as in classical job and/or flow shop problems. For a teleoperation job schedule, criteria are situation dependent. A criterion selection is fuzzily embedded in the task-skill matrix computation. However, goal achievement with minimum expected risk to the human operator is emphasized.

  3. Automatic, Rapid Replanning of Satellite Operations for Space Situational Awareness (SSA)

    NASA Astrophysics Data System (ADS)

    Stottler, D.; Mahan, K.

    An important component of Space Situational Awareness (SSA) is knowledge of the status and tasking of blue forces (e.g. satellites and ground stations) and the rapid determination of the impacts of real or hypothetical changes and the ability to quickly replan based on those changes. For example, if an antenna goes down (either for benign reasons or from purposeful interference) determining which missions will be impacted is important. It is not simply the set of missions that were scheduled to utilize that antenna, because highly expert human schedulers will respond to the outage by intelligently replanning the real-time schedule. We have developed an automatic scheduling and deconfliction engine, called MIDAS (for Managed Intelligent Deconfliction And Scheduling) that interfaces to the current legacy system (ESD 2.7) which can perform this replanning function automatically. In addition to determining the impact of failed resources, MIDAS can also replan in response to a satellite under attack. In this situation, additional supports must be quickly scheduled and executed (while minimizing impacts to other missions). Because MIDAS is a fully automatic system, replacing a current human labor-intensive process, and provides very rapid turnaround (seconds) it can also be used by commanders to consider what-if questions and focus limited protection resources on the most critical resources. For example, the commander can determine the impact of a successful attack on one of two ground stations and place heavier emphasis on protecting the station whose loss would create the most severe impacts. The system is currently transitioning to operational use. The MIDAS system and its interface to the legacy ESD 2.7 system will be described along with the ConOps for different types of detailed operational scenarios.

  4. Decision support system for the operating room rescheduling problem.

    PubMed

    van Essen, J Theresia; Hurink, Johann L; Hartholt, Woutske; van den Akker, Bernd J

    2012-12-01

    Due to surgery duration variability and arrivals of emergency surgeries, the planned Operating Room (OR) schedule is disrupted throughout the day which may lead to a change in the start time of the elective surgeries. These changes may result in undesirable situations for patients, wards or other involved departments, and therefore, the OR schedule has to be adjusted. In this paper, we develop a decision support system (DSS) which assists the OR manager in this decision by providing the three best adjusted OR schedules. The system considers the preferences of all involved stakeholders and only evaluates the OR schedules that satisfy the imposed resource constraints. The decision rules used for this system are based on a thorough analysis of the OR rescheduling problem. We model this problem as an Integer Linear Program (ILP) which objective is to minimize the deviation from the preferences of the considered stakeholders. By applying this ILP to instances from practice, we determined that the given preferences mainly lead to (i) shifting a surgery and (ii) scheduling a break between two surgeries. By using these changes in the DSS, the performed simulation study shows that less surgeries are canceled and patients and wards are more satisfied, but also that the perceived workload of several departments increases to compensate this. The system can also be used to judge the acceptability of a proposed initial OR schedule.

  5. CARMENES instrument control system and operational scheduler

    NASA Astrophysics Data System (ADS)

    Garcia-Piquer, Alvaro; Guàrdia, Josep; Colomé, Josep; Ribas, Ignasi; Gesa, Lluis; Morales, Juan Carlos; Pérez-Calpena, Ana; Seifert, Walter; Quirrenbach, Andreas; Amado, Pedro J.; Caballero, José A.; Reiners, Ansgar

    2014-07-01

    The main goal of the CARMENES instrument is to perform high-accuracy measurements of stellar radial velocities (1m/s) with long-term stability. CARMENES will be installed in 2015 at the 3.5 m telescope in the Calar Alto Observatory (Spain) and it will be equipped with two spectrographs covering from the visible to the near-infrared. It will make use of its near-IR capabilities to observe late-type stars, whose peak of the spectral energy distribution falls in the relevant wavelength interval. The technology needed to develop this instrument represents a challenge at all levels. We present two software packages that play a key role in the control layer for an efficient operation of the instrument: the Instrument Control System (ICS) and the Operational Scheduler. The coordination and management of CARMENES is handled by the ICS, which is responsible for carrying out the operations of the different subsystems providing a tool to operate the instrument in an integrated manner from low to high user interaction level. The ICS interacts with the following subsystems: the near-IR and visible channels, composed by the detectors and exposure meters; the calibration units; the environment sensors; the front-end electronics; the acquisition and guiding module; the interfaces with telescope and dome; and, finally, the software subsystems for operational scheduling of tasks, data processing, and data archiving. We describe the ICS software design, which implements the CARMENES operational design and is planned to be integrated in the instrument by the end of 2014. The CARMENES operational scheduler is the second key element in the control layer described in this contribution. It is the main actor in the translation of the survey strategy into a detailed schedule for the achievement of the optimization goals. The scheduler is based on Artificial Intelligence techniques and computes the survey planning by combining the static constraints that are known a priori (i.e., target visibility, sky background, required time sampling coverage) and the dynamic change of the system conditions (i.e., weather, system conditions). Off-line and on-line strategies are integrated into a single tool for a suitable transfer of the target prioritization made by the science team to the real-time schedule that will be used by the instrument operators. A suitable solution will be expected to increase the efficiency of telescope operations, which will represent an important benefit in terms of scientific return and operational costs. We present the operational scheduling tool designed for CARMENES, which is based on two algorithms combining a global and a local search: Genetic Algorithms and Hill Climbing astronomy-based heuristics, respectively. The algorithm explores a large amount of potential solutions from the vast search space and is able to identify the most efficient ones. A planning solution is considered efficient when it optimizes the objectives defined, which, in our case, are related to the reduction of the time that the telescope is not in use and the maximization of the scientific return, measured in terms of the time coverage of each target in the survey. We present the results obtained using different test cases.

  6. Schedule-Aware Workflow Management Systems

    NASA Astrophysics Data System (ADS)

    Mans, Ronny S.; Russell, Nick C.; van der Aalst, Wil M. P.; Moleman, Arnold J.; Bakker, Piet J. M.

    Contemporary workflow management systems offer work-items to users through specific work-lists. Users select the work-items they will perform without having a specific schedule in mind. However, in many environments work needs to be scheduled and performed at particular times. For example, in hospitals many work-items are linked to appointments, e.g., a doctor cannot perform surgery without reserving an operating theater and making sure that the patient is present. One of the problems when applying workflow technology in such domains is the lack of calendar-based scheduling support. In this paper, we present an approach that supports the seamless integration of unscheduled (flow) and scheduled (schedule) tasks. Using CPN Tools we have developed a specification and simulation model for schedule-aware workflow management systems. Based on this a system has been realized that uses YAWL, Microsoft Exchange Server 2007, Outlook, and a dedicated scheduling service. The approach is illustrated using a real-life case study at the AMC hospital in the Netherlands. In addition, we elaborate on the experiences obtained when developing and implementing a system of this scale using formal techniques.

  7. The role of artificial intelligence techniques in scheduling systems

    NASA Technical Reports Server (NTRS)

    Geoffroy, Amy L.; Britt, Daniel L.; Gohring, John R.

    1990-01-01

    Artificial Intelligence (AI) techniques provide good solutions for many of the problems which are characteristic of scheduling applications. However, scheduling is a large, complex heterogeneous problem. Different applications will require different solutions. Any individual application will require the use of a variety of techniques, including both AI and conventional software methods. The operational context of the scheduling system will also play a large role in design considerations. The key is to identify those places where a specific AI technique is in fact the preferable solution, and to integrate that technique into the overall architecture.

  8. Allocation of surgical procedures to operating rooms.

    PubMed

    Ozkarahan, I

    1995-08-01

    Reduction of health care costs is of paramount importance in our time. This paper is a part of the research which proposes an expert hospital decision support system for resource scheduling. The proposed system combines mathematical programming, knowledge base, and database technologies, and what is more, its friendly interface is suitable for any novice user. Operating rooms in hospitals represent big investments and must be utilized efficiently. In this paper, first a mathematical model similar to job shop scheduling models is developed. The model loads surgical cases to operating rooms by maximizing room utilization and minimizing overtime in a multiple operating room setting. Then a prototype expert system which replaces the expertise of the operations research analyst for the model, drives the modelbase, database, and manages the user dialog is developed. Finally, an overview of the sequencing procedures for operations within an operating room is also presented.

  9. Automating Mission Scheduling for Space-Based Observatories

    NASA Technical Reports Server (NTRS)

    Pell, Barney; Muscettola, Nicola; Hansson, Othar; Mohan, Sunil

    1998-01-01

    In this paper we describe the use of our planning and scheduling framework, HSTS, to reduce the complexity of science mission planning. This work is part of an overall project to enable a small team of scientists to control the operations of a spacecraft. The present process is highly labor intensive. Users (scientists and operators) rely on a non-codified understanding of the different spacecraft subsystems and of their operating constraints. They use a variety of software tools to support their decision making process. This paper considers the types of decision making that need to be supported/automated, the nature of the domain constraints and the capabilities needed to address them successfully, and the nature of external software systems with which the core planning/scheduling engine needs to interact. HSTS has been applied to science scheduling for EUVE and Cassini and is being adapted to support autonomous spacecraft operations in the New Millennium initiative.

  10. Optimum-AIV: A planning and scheduling system for spacecraft AIV

    NASA Technical Reports Server (NTRS)

    Arentoft, M. M.; Fuchs, Jens J.; Parrod, Y.; Gasquet, Andre; Stader, J.; Stokes, I.; Vadon, H.

    1991-01-01

    A project undertaken for the European Space Agency (ESA) is presented. The project is developing a knowledge based software system for planning and scheduling of activities for spacecraft assembly, integration, and verification (AIV). The system extends into the monitoring of plan execution and the plan repair phase. The objectives are to develop an operational kernel of a planning, scheduling, and plan repair tool, called OPTIMUM-AIV, and to provide facilities which will allow individual projects to customize the kernel to suit its specific needs. The kernel shall consist of a set of software functionalities for assistance in initial specification of the AIV plan, in verification and generation of valid plans and schedules for the AIV activities, and in interactive monitoring and execution problem recovery for the detailed AIV plans. Embedded in OPTIMUM-AIV are external interfaces which allow integration with alternative scheduling systems and project databases. The current status of the OPTIMUM-AIV project, as of Jan. 1991, is that a further analysis of the AIV domain has taken place through interviews with satellite AIV experts, a software requirement document (SRD) for the full operational tool was approved, and an architectural design document (ADD) for the kernel excluding external interfaces is ready for review.

  11. Evaluation of the Terminal Precision Scheduling and Spacing System for Near-Term NAS Application

    NASA Technical Reports Server (NTRS)

    Thipphavong, Jane; Martin, Lynne Hazel; Swenson, Harry N.; Lin, Paul; Nguyen, Jimmy

    2012-01-01

    NASA has developed a capability for terminal area precision scheduling and spacing (TAPSS) to provide higher capacity and more efficiently manage arrivals during peak demand periods. This advanced technology is NASA's vision for the NextGen terminal metering capability. A set of human-in-the-loop experiments was conducted to evaluate the performance of the TAPSS system for near-term implementation. The experiments evaluated the TAPSS system under the current terminal routing infrastructure to validate operational feasibility. A second goal of the study was to measure the benefit of the Center and TRACON advisory tools to help prioritize the requirements for controller radar display enhancements. Simulation results indicate that using the TAPSS system provides benefits under current operations, supporting a 10% increase in airport throughput. Enhancements to Center decision support tools had limited impact on improving the efficiency of terminal operations, but did provide more fuel-efficient advisories to achieve scheduling conformance within 20 seconds. The TRACON controller decision support tools were found to provide the most benefit, by improving the precision in schedule conformance to within 20 seconds, reducing the number of arrivals having lateral path deviations by 50% and lowering subjective controller workload. Overall, the TAPSS system was found to successfully develop an achievable terminal arrival metering plan that was sustainable under heavy traffic demand levels and reduce the complexity of terminal operations when coupled with the use of the terminal controller advisory tools.

  12. Comprehensive analysis of a Radiology Operations Management computer system.

    PubMed

    Arenson, R L; London, J W

    1979-11-01

    The Radiology Operations Management computer system at the Hospital of the University of Pennsylvania is discussed. The scheduling and file room modules are based on the system at Massachusetts General Hospital. Patient delays are indicated by the patient tracking module. A reporting module allows CRT/keyboard entry by transcriptionists, entry of standard reports by radiologists using bar code labels, and entry by radiologists using a specialty designed diagnostic reporting terminal. Time-flow analyses demonstrate a significant improvement in scheduling, patient waiting, retrieval of radiographs, and report delivery. Recovery of previously lost billing contributes to the proved cost effectiveness of this system.

  13. A Study on the Implementation of the Ecotran Systems, Inc. Computerized Routing and Scheduling Pupil Transportation System. San Diego Unified School District, Superintendent's Organizational Study Team.

    ERIC Educational Resources Information Center

    Carriedo, Ruben; And Others

    The San Diego Unified School District (California) began operating a computerized routing and scheduling system for its pupil transportation services at the beginning of the 1985-86 academic school year. The computerized system, provided by Ecotran Systems, Inc. (ECO) of Cleveland, Ohio experienced an inordinate number of difficulties. A…

  14. Benefits and challenges of health information systems for operations research: an illustrative example to improve surgical scheduling.

    PubMed

    Chow, Vincent S; Huang, Wenhai; Puterman, Martin L

    2009-01-01

    Operations research (OR) is playing an increasing role in the support of many health care initiatives. However one of the main challenges facing OR practitioners is the availability and the integrity of operations data. Hospital information systems (HIS) are often designed with a clinical or accounting focus and may lack the data necessary for operational studies. In this paper, we illustrate the data processing methods and data challenges faced by our team during a study of surgical scheduling practices at the Vancouver Island Health Authority. We also provide some general recommendations to improve HIS from an operations perspective. In general, more integration between operations researchers and HIS specialists are required to support ongoing operational improvements in the health care sector.

  15. Navy Occupational Health Information Management System (NOHIMS). Medical Exam Scheduling Module. Operators’ Guide

    DTIC Science & Technology

    1987-01-16

    Management System (NOHIMS) Industrial Hygiene (IH) Component database in order to perform these functions: (1) enroll and remove employees from Medical...The Medical Examination Scheduling (MES) module consists of a list of options that allow users to access the Navy Occupational Health Information

  16. The LSST Scheduler from design to construction

    NASA Astrophysics Data System (ADS)

    Delgado, Francisco; Reuter, Michael A.

    2016-07-01

    The Large Synoptic Survey Telescope (LSST) will be a highly robotic facility, demanding a very high efficiency during its operation. To achieve this, the LSST Scheduler has been envisioned as an autonomous software component of the Observatory Control System (OCS), that selects the sequence of targets in real time. The Scheduler will drive the survey using optimization of a dynamic cost function of more than 200 parameters. Multiple science programs produce thousands of candidate targets for each observation, and multiple telemetry measurements are received to evaluate the external and the internal conditions of the observatory. The design of the LSST Scheduler started early in the project supported by Model Based Systems Engineering, detailed prototyping and scientific validation of the survey capabilities required. In order to build such a critical component, an agile development path in incremental releases is presented, integrated to the development plan of the Operations Simulator (OpSim) to allow constant testing, integration and validation in a simulated OCS environment. The final product is a Scheduler that is also capable of running 2000 times faster than real time in simulation mode for survey studies and scientific validation during commissioning and operations.

  17. Autonomous power expert system

    NASA Technical Reports Server (NTRS)

    Walters, Jerry L.; Petrik, Edward J.; Roth, Mary Ellen; Truong, Long Van; Quinn, Todd; Krawczonek, Walter M.

    1990-01-01

    The Autonomous Power Expert (APEX) system was designed to monitor and diagnose fault conditions that occur within the Space Station Freedom Electrical Power System (SSF/EPS) Testbed. APEX is designed to interface with SSF/EPS testbed power management controllers to provide enhanced autonomous operation and control capability. The APEX architecture consists of three components: (1) a rule-based expert system, (2) a testbed data acquisition interface, and (3) a power scheduler interface. Fault detection, fault isolation, justification of probable causes, recommended actions, and incipient fault analysis are the main functions of the expert system component. The data acquisition component requests and receives pertinent parametric values from the EPS testbed and asserts the values into a knowledge base. Power load profile information is obtained from a remote scheduler through the power scheduler interface component. The current APEX design and development work is discussed. Operation and use of APEX by way of the user interface screens is also covered.

  18. Computer Applications in Class and Transportation Scheduling. Educational Management Review Series Number 1.

    ERIC Educational Resources Information Center

    Piele, Philip K.

    This document shows how computer technology can aid educators in meeting demands for improved class scheduling and more efficient use of transportation resources. The first section surveys literature on operational systems that provide individualized scheduling for students, varied class structures, and maximum use of space and staff skills.…

  19. 47 CFR 90.727 - Extended implementation schedules for Phase I licensees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Extended implementation schedules for Phase I... Frequencies in the 220-222 MHz Band § 90.727 Extended implementation schedules for Phase I licensees. Except... constructing and placing a system in operation if: (a) The applicant submits justification for an extended...

  20. 47 CFR 90.727 - Extended implementation schedules for Phase I licensees.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Extended implementation schedules for Phase I... Frequencies in the 220-222 MHz Band § 90.727 Extended implementation schedules for Phase I licensees. Except... constructing and placing a system in operation if: (a) The applicant submits justification for an extended...

  1. 47 CFR 90.727 - Extended implementation schedules for Phase I licensees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Extended implementation schedules for Phase I... Frequencies in the 220-222 MHz Band § 90.727 Extended implementation schedules for Phase I licensees. Except... constructing and placing a system in operation if: (a) The applicant submits justification for an extended...

  2. 47 CFR 90.727 - Extended implementation schedules for Phase I licensees.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Extended implementation schedules for Phase I... Frequencies in the 220-222 MHz Band § 90.727 Extended implementation schedules for Phase I licensees. Except... constructing and placing a system in operation if: (a) The applicant submits justification for an extended...

  3. 47 CFR 90.727 - Extended implementation schedules for Phase I licensees.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Extended implementation schedules for Phase I... Frequencies in the 220-222 MHz Band § 90.727 Extended implementation schedules for Phase I licensees. Except... constructing and placing a system in operation if: (a) The applicant submits justification for an extended...

  4. The application of artificial intelligence to astronomical scheduling problems

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.

    1992-01-01

    Efficient utilization of expensive space- and ground-based observatories is an important goal for the astronomical community; the cost of modern observing facilities is enormous, and the available observing time is much less than the demand from astronomers around the world. The complexity and variety of scheduling constraints and goals has led several groups to investigate how artificial intelligence (AI) techniques might help solve these kinds of problems. The earliest and most successful of these projects was started at Space Telescope Science Institute in 1987 and has led to the development of the Spike scheduling system to support the scheduling of Hubble Space Telescope (HST). The aim of Spike at STScI is to allocate observations to timescales of days to a week observing all scheduling constraints and maximizing preferences that help ensure that observations are made at optimal times. Spike has been in use operationally for HST since shortly after the observatory was launched in Apr. 1990. Although developed specifically for HST scheduling, Spike was carefully designed to provide a general framework for similar (activity-based) scheduling problems. In particular, the tasks to be scheduled are defined in the system in general terms, and no assumptions about the scheduling timescale are built in. The mechanisms for describing, combining, and propagating temporal and other constraints and preferences are quite general. The success of this approach has been demonstrated by the application of Spike to the scheduling of other satellite observatories: changes to the system are required only in the specific constraints that apply, and not in the framework itself. In particular, the Spike framework is sufficiently flexible to handle both long-term and short-term scheduling, on timescales of years down to minutes or less. This talk will discuss recent progress made in scheduling search techniques, the lessons learned from early HST operations, the application of Spike to other problem domains, and plans for the future evolution of the system.

  5. Science returns of flexible scheduling on UKIRT and the JCMT

    NASA Astrophysics Data System (ADS)

    Adamson, Andrew J.; Tilanus, Remo P.; Buckle, Jane; Davis, Gary R.; Economou, Frossie; Jenness, Tim; Delorey, K.

    2004-09-01

    The Joint Astronomy Centre operates two telescopes at the Mauna Kea Observatory: the James Clerk Maxwell Telescope, operating in the submillimetre, and the United Kingdom Infrared Telescope, operating in the near and thermal infrared. Both wavelength regimes benefit from the ability to schedule observations flexibly according to observing conditions, albeit via somewhat different "site quality" criteria. Both UKIRT and JCMT now operate completely flexible schedules. These operations are based on telescope hardware which can quickly switch between observing modes, and on a comprehensive suite of software (ORAC/OMP) which handles observing preparation by remote PIs, observation submission into the summit database, conditions-based programme selection at the summit, pipeline data reduction for all observing modes, and instant data quality feedback to the PI who may or may not be remote from the telescope. This paper describes the flexible scheduling model and presents science statistics for the first complete year of UKIRT and JCMT observing under the combined system.

  6. A Systematic Multi-Time Scale Solution for Regional Power Grid Operation

    NASA Astrophysics Data System (ADS)

    Zhu, W. J.; Liu, Z. G.; Cheng, T.; Hu, B. Q.; Liu, X. Z.; Zhou, Y. F.

    2017-10-01

    Many aspects need to be taken into consideration in a regional grid while making schedule plans. In this paper, a systematic multi-time scale solution for regional power grid operation considering large scale renewable energy integration and Ultra High Voltage (UHV) power transmission is proposed. In the time scale aspect, we discuss the problem from month, week, day-ahead, within-day to day-behind, and the system also contains multiple generator types including thermal units, hydro-plants, wind turbines and pumped storage stations. The 9 subsystems of the scheduling system are described, and their functions and relationships are elaborated. The proposed system has been constructed in a provincial power grid in Central China, and the operation results further verified the effectiveness of the system.

  7. Power Grid Maintenance Scheduling Intelligence Arrangement Supporting System Based on Power Flow Forecasting

    NASA Astrophysics Data System (ADS)

    Xie, Chang; Wen, Jing; Liu, Wenying; Wang, Jiaming

    With the development of intelligent dispatching, the intelligence level of network control center full-service urgent need to raise. As an important daily work of network control center, the application of maintenance scheduling intelligent arrangement to achieve high-quality and safety operation of power grid is very important. By analyzing the shortages of the traditional maintenance scheduling software, this paper designs a power grid maintenance scheduling intelligence arrangement supporting system based on power flow forecasting, which uses the advanced technologies in maintenance scheduling, such as artificial intelligence, online security checking, intelligent visualization techniques. It implements the online security checking of maintenance scheduling based on power flow forecasting and power flow adjusting based on visualization, in order to make the maintenance scheduling arrangement moreintelligent and visual.

  8. Investigations into Generalization of Constraint-Based Scheduling Theories with Applications to Space Telescope Observation Scheduling

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Smith, Steven S.

    1996-01-01

    This final report summarizes research performed under NASA contract NCC 2-531 toward generalization of constraint-based scheduling theories and techniques for application to space telescope observation scheduling problems. Our work into theories and techniques for solution of this class of problems has led to the development of the Heuristic Scheduling Testbed System (HSTS), a software system for integrated planning and scheduling. Within HSTS, planning and scheduling are treated as two complementary aspects of the more general process of constructing a feasible set of behaviors of a target system. We have validated the HSTS approach by applying it to the generation of observation schedules for the Hubble Space Telescope. This report summarizes the HSTS framework and its application to the Hubble Space Telescope domain. First, the HSTS software architecture is described, indicating (1) how the structure and dynamics of a system is modeled in HSTS, (2) how schedules are represented at multiple levels of abstraction, and (3) the problem solving machinery that is provided. Next, the specific scheduler developed within this software architecture for detailed management of Hubble Space Telescope operations is presented. Finally, experimental performance results are given that confirm the utility and practicality of the approach.

  9. The effect of dynamic scheduling and routing in a solid waste management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johansson, Ola M.

    2006-07-01

    Solid waste collection and hauling account for the greater part of the total cost in modern solid waste management systems. In a recent initiative, 3300 Swedish recycling containers have been fitted with level sensors and wireless communication equipment, thereby giving waste collection operators access to real-time information on the status of each container. In this study, analytical modeling and discrete-event simulation have been used to evaluate different scheduling and routing policies utilizing the real-time data. In addition to the general models developed, an empirical simulation study has been performed on the downtown recycling station system in Malmoe, Sweden. From themore » study, it can be concluded that dynamic scheduling and routing policies exist that have lower operating costs, shorter collection and hauling distances, and reduced labor hours compared to the static policy with fixed routes and pre-determined pick-up frequencies employed by many waste collection operators today. The results of the analytical model and the simulation models are coherent, and consistent with experiences of the waste collection operators.« less

  10. Scheduling the future NASA Space Network: Experiences with a flexible scheduling prototype

    NASA Technical Reports Server (NTRS)

    Happell, Nadine; Moe, Karen L.; Minnix, Jay

    1993-01-01

    NASA's Space Network (SN) provides telecommunications and tracking services to low earth orbiting spacecraft. One proposal for improving resource allocation and automating conflict resolution for the SN is the concept of flexible scheduling. In this concept, each Payload Operations Control Center (POCC) will possess a Space Network User POCC Interface (SNUPI) to support the development and management of flexible requests. Flexible requests express the flexibility, constraints, and repetitious nature of the user's communications requirements. Flexible scheduling is expected to improve SN resource utilization and user satisfaction, as well as reduce the effort to produce and maintain a schedule. A prototype testbed has been developed to better understand flexible scheduling as it applies to the SN. This testbed consists of a SNUPI workstation, an SN scheduler, and a flexible request language that conveys information between the two systems. All three are being evaluated by operations personnel. Benchmark testing is being conducted on the scheduler to quantify the productivity improvements achieved with flexible requests.

  11. 76 FR 19911 - Drawbridge Operation Regulation; Calcasieu River, Westlake, LA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-11

    ... maintenance and updates to the bridge's operating system. This deviation allows the bridge to remain closed to...'s operating system while minimizing the exposure of personnel to hazards associated with performing... deviation from the operating schedule for the swing span bridge across the Calcasieu River, mile 36.4, at...

  12. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1991-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  13. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1991-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocations for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its applications to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  14. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  15. Proposed algorithm to improve job shop production scheduling using ant colony optimization method

    NASA Astrophysics Data System (ADS)

    Pakpahan, Eka KA; Kristina, Sonna; Setiawan, Ari

    2017-12-01

    This paper deals with the determination of job shop production schedule on an automatic environment. On this particular environment, machines and material handling system are integrated and controlled by a computer center where schedule were created and then used to dictate the movement of parts and the operations at each machine. This setting is usually designed to have an unmanned production process for a specified interval time. We consider here parts with various operations requirement. Each operation requires specific cutting tools. These parts are to be scheduled on machines each having identical capability, meaning that each machine is equipped with a similar set of cutting tools therefore is capable of processing any operation. The availability of a particular machine to process a particular operation is determined by the remaining life time of its cutting tools. We proposed an algorithm based on the ant colony optimization method and embedded them on matlab software to generate production schedule which minimize the total processing time of the parts (makespan). We test the algorithm on data provided by real industry and the process shows a very short computation time. This contributes a lot to the flexibility and timelines targeted on an automatic environment.

  16. How shift scheduling practices contribute to fatigue amongst freight rail operating employees: Findings from Canadian accident investigations.

    PubMed

    Rudin-Brown, Christina M; Harris, Sarah; Rosberg, Ari

    2018-02-01

    Canada's freight rail system moves 70% of the country's surface goods and almost half of all exports (RAC, 2016). These include dangerous goods. Anonymous survey of freight rail operating employees conducted by the Teamsters Canada Rail Conference (TCRC, 2014) revealed that many do not report getting enough sleep because of their work schedules, and that fatigue may be affecting their performance at work. Besides general impairments in attention and cognitive functioning, fatigue in railway operating employees slows reaction time to safety alarms and impairs conformance to train operating requirements. Shift scheduling practices can contribute to sleep-related fatigue by restricting sleep opportunities, requiring extended periods of wakefulness and by disrupting daily (circadian) rhythms. The primary goal of accident investigation is to identify causal and contributing factors so that similar occurrences can be prevented. A database search of Transportation Safety Board (TSB) rail investigation reports published in the 21-year period from 1995 to 2015 identified 18 that cited sleep-related fatigue of freight rail operating employees as a causal, contributing, or risk finding. This number represents about 20% of TSB rail investigations from the same period in which a human factors aspect of freight train activities was a primary cause. Exploration of accident themes suggests that management of fatigue and shift scheduling in the freight rail industry is a complex issue that is often not conducive to employee circadian rhythms and sleep requirements. It also suggests that current shift scheduling and fatigue management practices may be insufficient to mitigate the associated safety risk. Railway fatigue management systems that are based on the principles of modern sleep science are needed to improve scheduling practices and mitigate the ongoing safety risk. Crown Copyright © 2018. Published by Elsevier Ltd. All rights reserved.

  17. An Efficient Randomized Algorithm for Real-Time Process Scheduling in PicOS Operating System

    NASA Astrophysics Data System (ADS)

    Helmy*, Tarek; Fatai, Anifowose; Sallam, El-Sayed

    PicOS is an event-driven operating environment designed for use with embedded networked sensors. More specifically, it is designed to support the concurrency in intensive operations required by networked sensors with minimal hardware requirements. Existing process scheduling algorithms of PicOS; a commercial tiny, low-footprint, real-time operating system; have their associated drawbacks. An efficient, alternative algorithm, based on a randomized selection policy, has been proposed, demonstrated, confirmed for efficiency and fairness, on the average, and has been recommended for implementation in PicOS. Simulations were carried out and performance measures such as Average Waiting Time (AWT) and Average Turn-around Time (ATT) were used to assess the efficiency of the proposed randomized version over the existing ones. The results prove that Randomized algorithm is the best and most attractive for implementation in PicOS, since it is most fair and has the least AWT and ATT on average over the other non-preemptive scheduling algorithms implemented in this paper.

  18. System control of an autonomous planetary mobile spacecraft

    NASA Technical Reports Server (NTRS)

    Dias, William C.; Zimmerman, Barbara A.

    1990-01-01

    The goal is to suggest the scheduling and control functions necessary for accomplishing mission objectives of a fairly autonomous interplanetary mobile spacecraft, while maximizing reliability. Goals are to provide an extensible, reliable system conservative in its use of on-board resources, while getting full value from subsystem autonomy, and avoiding the lure of ground micromanagement. A functional layout consisting of four basic elements is proposed: GROUND and SYSTEM EXECUTIVE system functions and RESOURCE CONTROL and ACTIVITY MANAGER subsystem functions. The system executive includes six subfunctions: SYSTEM MANAGER, SYSTEM FAULT PROTECTION, PLANNER, SCHEDULE ADAPTER, EVENT MONITOR and RESOURCE MONITOR. The full configuration is needed for autonomous operation on Moon or Mars, whereas a reduced version without the planning, schedule adaption and event monitoring functions could be appropriate for lower-autonomy use on the Moon. An implementation concept is suggested which is conservative in use of system resources and consists of modules combined with a network communications fabric. A language concept termed a scheduling calculus for rapidly performing essential on-board schedule adaption functions is introduced.

  19. Multiresource allocation and scheduling for periodic soft real-time applications

    NASA Astrophysics Data System (ADS)

    Gopalan, Kartik; Chiueh, Tzi-cker

    2001-12-01

    Real-time applications that utilize multiple system resources, such as CPU, disks, and network links, require coordinated scheduling of these resources in order to meet their end-to-end performance requirements. Most state-of-the-art operating systems support independent resource allocation and deadline-driven scheduling but lack coordination among multiple heterogeneous resources. This paper describes the design and implementation of an Integrated Real-time Resource Scheduler (IRS) that performs coordinated allocation and scheduling of multiple heterogeneous resources on the same machine for periodic soft real-time application. The principal feature of IRS is a heuristic multi-resource allocation algorithm that reserves multiple resources for real-time applications in a manner that can maximize the number of applications admitted into the system in the long run. At run-time, a global scheduler dispatches the tasks of the soft real-time application to individual resource schedulers according to the precedence constraints between tasks. The individual resource schedulers, which could be any deadline based schedulers, can make scheduling decisions locally and yet collectively satisfy a real-time application's performance requirements. The tightness of overall timing guarantees is ultimately determined by the properties of individual resource schedulers. However, IRS maximizes overall system resource utilization efficiency by coordinating deadline assignment across multiple tasks in a soft real-time application.

  20. A Study on Real-Time Scheduling Methods in Holonic Manufacturing Systems

    NASA Astrophysics Data System (ADS)

    Iwamura, Koji; Taimizu, Yoshitaka; Sugimura, Nobuhiro

    Recently, new architectures of manufacturing systems have been proposed to realize flexible control structures of the manufacturing systems, which can cope with the dynamic changes in the volume and the variety of the products and also the unforeseen disruptions, such as failures of manufacturing resources and interruptions by high priority jobs. They are so called as the autonomous distributed manufacturing system, the biological manufacturing system and the holonic manufacturing system. Rule-based scheduling methods were proposed and applied to the real-time production scheduling problems of the HMS (Holonic Manufacturing System) in the previous report. However, there are still remaining problems from the viewpoint of the optimization of the whole production schedules. New procedures are proposed, in the present paper, to select the production schedules, aimed at generating effective production schedules in real-time. The proposed methods enable the individual holons to select suitable machining operations to be carried out in the next time period. Coordination process among the holons is also proposed to carry out the coordination based on the effectiveness values of the individual holons.

  1. Automated mixed traffic vehicle control and scheduling study

    NASA Technical Reports Server (NTRS)

    Peng, T. K. C.; Chon, K.

    1976-01-01

    The operation and the expected performance of a proposed automatic guideway transit system which uses low speed automated mixed traffic vehicles (AMTVs) were analyzed. Vehicle scheduling and headway control policies were evaluated with a transit system simulation model. The effect of mixed traffic interference on the average vehicle speed was examined with a vehicle pedestrian interface model. Control parameters regulating vehicle speed were evaluated for safe stopping and passenger comfort. Some preliminary data on the cost and operation of an experimental AMTV system are included. These data were the result of a separate task conducted at JPL, and were included as background information.

  2. Scheduling Software for Complex Scenarios

    NASA Technical Reports Server (NTRS)

    2006-01-01

    Preparing a vehicle and its payload for a single launch is a complex process that involves thousands of operations. Because the equipment and facilities required to carry out these operations are extremely expensive and limited in number, optimal assignment and efficient use are critically important. Overlapping missions that compete for the same resources, ground rules, safety requirements, and the unique needs of processing vehicles and payloads destined for space impose numerous constraints that, when combined, require advanced scheduling. Traditional scheduling systems use simple algorithms and criteria when selecting activities and assigning resources and times to each activity. Schedules generated by these simple decision rules are, however, frequently far from optimal. To resolve mission-critical scheduling issues and predict possible problem areas, NASA historically relied upon expert human schedulers who used their judgment and experience to determine where things should happen, whether they will happen on time, and whether the requested resources are truly necessary.

  3. A real-time programming system.

    PubMed

    Townsend, H R

    1979-03-01

    The paper describes a Basic Operating and Scheduling System (BOSS) designed for a small computer. User programs are organised as self-contained modular 'processes' and the way in which the scheduler divides the time of the computer equally between them, while arranging for any process which has to respond to an interrupt from a peripheral device to be given the necessary priority, is described in detail. Next the procedures provided by the operating system to organise communication between processes are described, and how they are used to construct dynamically self-modifying real-time systems. Finally, the general philosophy of BOSS and applications to a multi-processor assembly are discussed.

  4. A Study on Human Oriented Autonomous Distributed Manufacturing System —Real-time Scheduling Method Based on Preference of Human Operators

    NASA Astrophysics Data System (ADS)

    Iwamura, Koji; Kuwahara, Shinya; Tanimizu, Yoshitaka; Sugimura, Nobuhiro

    Recently, new distributed architectures of manufacturing systems are proposed, aiming at realizing more flexible control structures of the manufacturing systems. Many researches have been carried out to deal with the distributed architectures for planning and control of the manufacturing systems. However, the human operators have not yet been discussed for the autonomous components of the distributed manufacturing systems. A real-time scheduling method is proposed, in this research, to select suitable combinations of the human operators, the resources and the jobs for the manufacturing processes. The proposed scheduling method consists of following three steps. In the first step, the human operators select their favorite manufacturing processes which they will carry out in the next time period, based on their preferences. In the second step, the machine tools and the jobs select suitable combinations for the next machining processes. In the third step, the automated guided vehicles and the jobs select suitable combinations for the next transportation processes. The second and third steps are carried out by using the utility value based method and the dispatching rule-based method proposed in the previous researches. Some case studies have been carried out to verify the effectiveness of the proposed method.

  5. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cover, Columbia, South Carolina

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.

  6. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cover, Columbia, South Carolina

    NASA Astrophysics Data System (ADS)

    1980-09-01

    Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.

  7. On-board emergent scheduling of autonomous spacecraft payload operations

    NASA Technical Reports Server (NTRS)

    Lindley, Craig A.

    1994-01-01

    This paper describes a behavioral competency level concerned with emergent scheduling of spacecraft payload operations. The level is part of a multi-level subsumption architecture model for autonomous spacecraft, and it functions as an action selection system for processing a spacecraft commands that can be considered as 'plans-as-communication'. Several versions of the selection mechanism are described, and their robustness is qualitatively compared.

  8. Seamless transitions from early prototypes to mature operational software - A technology that enables the process for planning and scheduling applications

    NASA Technical Reports Server (NTRS)

    Hornstein, Rhoda S.; Wunderlich, Dana A.; Willoughby, John K.

    1992-01-01

    New and innovative software technology is presented that provides a cost effective bridge for smoothly transitioning prototype software, in the field of planning and scheduling, into an operational environment. Specifically, this technology mixes the flexibility and human design efficiency of dynamic data typing with the rigor and run-time efficiencies of static data typing. This new technology provides a very valuable tool for conducting the extensive, up-front system prototyping that leads to specifying the correct system and producing a reliable, efficient version that will be operationally effective and will be accepted by the intended users.

  9. SOCAP: Lessons learned in applying SIPE-2 to the military operations crisis action planning domain

    NASA Technical Reports Server (NTRS)

    Desimone, Roberto

    1992-01-01

    This report describes work funded under the DARPA Planning and Scheduling Initiative that led to the development of SOCAP (System for Operations Crisis Action Planning). In particular, it describes lessons learned in applying SIPE-2, the underlying AI planning technology within SOCAP, to the domain of military operations deliberate and crisis action planning. SOCAP was demonstrated at the U.S. Central Command and at the Pentagon in early 1992. A more detailed report about the lessons learned is currently being prepared. This report was presented during one of the panel discussions on 'The Relevance of Scheduling to AI Planning Systems.'

  10. Development of the Optimum Operation Scheduling Model of Domestic Electric Appliances for the Supply-Demand Adjustment in a Power System

    NASA Astrophysics Data System (ADS)

    Ikegami, Takashi; Iwafune, Yumiko; Ogimoto, Kazuhiko

    The high penetration of variable renewable generation such as Photovoltaic (PV) systems will cause the issue of supply-demand imbalance in a whole power system. The activation of the residential power usage, storage and generation by sophisticated scheduling and control using the Home Energy Management System (HEMS) will be needed to balance power supply and demand in the near future. In order to evaluate the applicability of the HEMS as a distributed controller for local and system-wide supply-demand balances, we developed an optimum operation scheduling model of domestic electric appliances using the mixed integer linear programming. Applying this model to several houses with dynamic electricity prices reflecting the power balance of the total power system, it was found that the adequate changes in electricity prices bring about the shift of residential power usages to control the amount of the reverse power flow due to excess PV generation.

  11. A Web-Remote/Robotic/Scheduled Astronomical Data Acquisition System

    NASA Astrophysics Data System (ADS)

    Denny, Robert

    2011-03-01

    Traditionally, remote/robotic observatory operating systems have been custom made for each observatory. While data reduction pipelines need to be tailored for each investigation, the data acquisition process (especially for stare-mode optical images) is often quite similar across investigations. Since 1999, DC-3 Dreams has focused on providing and supporting a remote/robotic observatory operating system which can be adapted to a wide variety of physical hardware and optics while achieving the highest practical observing efficiency and safe/secure web browser user controls. ACP Expert consists of three main subsystems: (1) a robotic list-driven data acquisition engine which controls all aspects of the observatory, (2) a constraint-driven dispatch scheduler with a long-term database of requests, and (3) a built-in "zero admin" web server and dynamic web pages which provide a remote capability for immediate execution and monitoring as well as entry and monitoring of dispatch-scheduled observing requests. No remote desktop login is necessary for observing, thus keeping the system safe and consistent. All routine operation is via the web browser. A wide variety of telescope mounts, CCD imagers, guiding sensors, filter selectors, focusers, instrument-package rotators, weather sensors, and dome control systems are supported via the ASCOM standardized device driver architecture. The system is most commonly employed on commercial 1-meter and smaller observatories used by universities and advanced amateurs for both science and art. One current project, the AAVSO Photometric All-Sky Survey (APASS), uses ACP Expert to acquire large volumes of data in dispatch-scheduled mode. In its first 18 months of operation (North then South), 40,307 sky images were acquired in 117 photometric nights, resulting in 12,107,135 stars detected two or more times. These stars had measures in 5 filters. The northern station covered 754 fields (6446 square degrees) at least twice, the southern station covered 951 fields (8500 square degrees) at least twice. The database of photometric calibrations is available from AAVSO. The paper will cover the ACP web interface, including the use of AJAX and JSON within a micro-content framework, as well as dispatch scheduler and acquisition engine operation.

  12. Optimisation of assembly scheduling in VCIM systems using genetic algorithm

    NASA Astrophysics Data System (ADS)

    Dao, Son Duy; Abhary, Kazem; Marian, Romeo

    2017-09-01

    Assembly plays an important role in any production system as it constitutes a significant portion of the lead time and cost of a product. Virtual computer-integrated manufacturing (VCIM) system is a modern production system being conceptually developed to extend the application of traditional computer-integrated manufacturing (CIM) system to global level. Assembly scheduling in VCIM systems is quite different from one in traditional production systems because of the difference in the working principles of the two systems. In this article, the assembly scheduling problem in VCIM systems is modeled and then an integrated approach based on genetic algorithm (GA) is proposed to search for a global optimised solution to the problem. Because of dynamic nature of the scheduling problem, a novel GA with unique chromosome representation and modified genetic operations is developed herein. Robustness of the proposed approach is verified by a numerical example.

  13. Three-Stage Production Cost Modeling Approach for Evaluating the Benefits of Intra-Hour Scheduling between Balancing Authorities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Samaan, Nader A.; Milligan, Michael; Hunsaker, Matthew

    This paper introduces a Production Cost Modeling (PCM) approach to evaluate the benefits of intra-hour scheduling between Balancing Authorities (BAs). The system operation is modeled in a three-stage sequential manner: day ahead (DA)-hour ahead (HA)-real time (RT). In addition to contingency reserve, each BA will need to carry out “up” and “down” load following and regulation reserve capacity requirements in the DA and HA time frames. In the real-time simulation, only contingency and regulation reserves are carried out as load following is deployed. To model current real-time operation with hourly schedules, a new constraint was introduced to force each BAmore » net exchange schedule deviation from HA schedules to be within NERC ACE limits. Case studies that investigate the benefits of moving from hourly exchange schedules between WECC BAs into 10-min exchange schedules under two different levels of wind and solar penetration (11% and 33%) are presented.« less

  14. Three-Stage Production Cost Modeling Approach for Evaluating the Benefits of Intra-Hour Scheduling Between Balancing Authorities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Samaan, Nader; Milligan, Michael; Hunsaker, Matt

    This paper introduces a production cost modeling approach for evaluating the benefits of intra-hour scheduling among Balancing Authorities (BAs). System operation is modeled in a three-stage sequential manner: day ahead (DA)-hour ahead (HA) real time (RT). In addition to contingency reserve, each BA will need to carry out 'up' and 'down' load following and regulation reserve capacity requirements in the DA and HA time frames. In the RT simulation, only contingency and regulation reserves are carried out as load following is deployed. To model current RT operation with hourly schedules, a new constraint was introduced to force each BA netmore » exchange schedule deviation from HA schedules to be within North American Electric Reliability Corporation (NERC) area control error (ACE) limits. Case studies that investigate the benefits of moving from hourly exchange schedules between Western Electricity Coordinating Council (WECC) BAs into 10-minute exchange schedules under two different levels of wind and solar penetration (11% and 33%) are presented.« less

  15. PanDA Pilot Submission using Condor-G: Experience and Improvements

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhao X.; Hover John; Wlodek Tomasz

    2011-01-01

    PanDA (Production and Distributed Analysis) is the workload management system of the ATLAS experiment, used to run managed production and user analysis jobs on the grid. As a late-binding, pilot-based system, the maintenance of a smooth and steady stream of pilot jobs to all grid sites is critical for PanDA operation. The ATLAS Computing Facility (ACF) at BNL, as the ATLAS Tier1 center in the US, operates the pilot submission systems for the US. This is done using the PanDA 'AutoPilot' scheduler component which submits pilot jobs via Condor-G, a grid job scheduling system developed at the University of Wisconsin-Madison.more » In this paper, we discuss the operation and performance of the Condor-G pilot submission at BNL, with emphasis on the challenges and issues encountered in the real grid production environment. With the close collaboration of Condor and PanDA teams, the scalability and stability of the overall system has been greatly improved over the last year. We review improvements made to Condor-G resulting from this collaboration, including isolation of site-based issues by running a separate Gridmanager for each remote site, introduction of the 'Nonessential' job attribute to allow Condor to optimize its behavior for the specific character of pilot jobs, better understanding and handling of the Gridmonitor process, as well as better scheduling in the PanDA pilot scheduler component. We will also cover the monitoring of the health of the system.« less

  16. Design and Evaluation of the Terminal Area Precision Scheduling and Spacing System

    NASA Technical Reports Server (NTRS)

    Swenson, Harry N.; Thipphavong, Jane; Sadovsky, Alex; Chen, Liang; Sullivan, Chris; Martin, Lynne

    2011-01-01

    This paper describes the design, development and results from a high fidelity human-in-the-loop simulation of an integrated set of trajectory-based automation tools providing precision scheduling, sequencing and controller merging and spacing functions. These integrated functions are combined into a system called the Terminal Area Precision Scheduling and Spacing (TAPSS) system. It is a strategic and tactical planning tool that provides Traffic Management Coordinators, En Route and Terminal Radar Approach Control air traffic controllers the ability to efficiently optimize the arrival capacity of a demand-impacted airport while simultaneously enabling fuel-efficient descent procedures. The TAPSS system consists of four-dimensional trajectory prediction, arrival runway balancing, aircraft separation constraint-based scheduling, traffic flow visualization and trajectory-based advisories to assist controllers in efficient metering, sequencing and spacing. The TAPSS system was evaluated and compared to today's ATC operation through extensive series of human-in-the-loop simulations for arrival flows into the Los Angeles International Airport. The test conditions included the variation of aircraft demand from a baseline of today's capacity constrained periods through 5%, 10% and 20% increases. Performance data were collected for engineering and human factor analysis and compared with similar operations both with and without the TAPSS system. The engineering data indicate operations with the TAPSS show up to a 10% increase in airport throughput during capacity constrained periods while maintaining fuel-efficient aircraft descent profiles from cruise to landing.

  17. Forecasting Wind and Solar Generation: Improving System Operations, Greening the Grid (Spanish Version)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tian, Tian; Chernyakhovskiy, Ilya; Brancucci Martinez-Anido, Carlo

    This document is the Spanish version of 'Greening the Grid- Forecasting Wind and Solar Generation Improving System Operations'. It discusses improving system operations with forecasting with and solar generation. By integrating variable renewable energy (VRE) forecasts into system operations, power system operators can anticipate up- and down-ramps in VRE generation in order to cost-effectively balance load and generation in intra-day and day-ahead scheduling. This leads to reduced fuel costs, improved system reliability, and maximum use of renewable resources.

  18. Economic analysis of linking operating room scheduling and hospital material management information systems for just-in-time inventory control.

    PubMed

    Epstein, R H; Dexter, F

    2000-08-01

    Operating room (OR) scheduling information systems can decrease perioperative labor costs. Material management information systems can decrease perioperative inventory costs. We used computer simulation to investigate whether using the OR schedule to trigger purchasing of perioperative supplies is likely to further decrease perioperative inventory costs, as compared with using sophisticated, stand-alone material management inventory control. Although we designed the simulations to favor financially linking the information systems, we found that this strategy would be expected to decrease inventory costs substantively only for items of high price ($1000 each) and volume (>1000 used each year). Because expensive items typically have different models and sizes, each of which is used by a hospital less often than this, for almost all items there will be no benefit to making daily adjustments to the order volume based on booked cases. We conclude that, in a hospital with a sophisticated material management information system, OR managers will probably achieve greater cost reductions from focusing on negotiating less expensive purchase prices for items than on trying to link the OR information system with the hospital's material management information system to achieve just-in-time inventory control. In a hospital with a sophisticated material management information system, operating room managers will probably achieve greater cost reductions from focusing on negotiating less expensive purchase prices for items than on trying to link the operating room information system with the hospital's material management information system to achieve just-in-time inventory control.

  19. A Genetic Algorithm for Flow Shop Scheduling with Assembly Operations to Minimize Makespan

    NASA Astrophysics Data System (ADS)

    Bhongade, A. S.; Khodke, P. M.

    2014-04-01

    Manufacturing systems, in which, several parts are processed through machining workstations and later assembled to form final products, is common. Though scheduling of such problems are solved using heuristics, available solution approaches can provide solution for only moderate sized problems due to large computation time required. In this work, scheduling approach is developed for such flow-shop manufacturing system having machining workstations followed by assembly workstations. The initial schedule is generated using Disjunctive method and genetic algorithm (GA) is applied further for generating schedule for large sized problems. GA is found to give near optimal solution based on the deviation of makespan from lower bound. The lower bound of makespan of such problem is estimated and percent deviation of makespan from lower bounds is used as a performance measure to evaluate the schedules. Computational experiments are conducted on problems developed using fractional factorial orthogonal array, varying the number of parts per product, number of products, and number of workstations (ranging upto 1,520 number of operations). A statistical analysis indicated the significance of all the three factors considered. It is concluded that GA method can obtain optimal makespan.

  20. Influencing Trust for Human-Automation Collaborative Scheduling of Multiple Unmanned Vehicles.

    PubMed

    Clare, Andrew S; Cummings, Mary L; Repenning, Nelson P

    2015-11-01

    We examined the impact of priming on operator trust and system performance when supervising a decentralized network of heterogeneous unmanned vehicles (UVs). Advances in autonomy have enabled a future vision of single-operator control of multiple heterogeneous UVs. Real-time scheduling for multiple UVs in uncertain environments requires the computational ability of optimization algorithms combined with the judgment and adaptability of human supervisors. Because of system and environmental uncertainty, appropriate operator trust will be instrumental to maintain high system performance and prevent cognitive overload. Three groups of operators experienced different levels of trust priming prior to conducting simulated missions in an existing, multiple-UV simulation environment. Participants who play computer and video games frequently were found to have a higher propensity to overtrust automation. By priming gamers to lower their initial trust to a more appropriate level, system performance was improved by 10% as compared to gamers who were primed to have higher trust in the automation. Priming was successful at adjusting the operator's initial and dynamic trust in the automated scheduling algorithm, which had a substantial impact on system performance. These results have important implications for personnel selection and training for futuristic multi-UV systems under human supervision. Although gamers may bring valuable skills, they may also be potentially prone to automation bias. Priming during training and regular priming throughout missions may be one potential method for overcoming this propensity to overtrust automation. © 2015, Human Factors and Ergonomics Society.

  1. Constraint based scheduling for the Goddard Space Flight Center distributed Active Archive Center's data archive and distribution system

    NASA Technical Reports Server (NTRS)

    Short, Nick, Jr.; Bedet, Jean-Jacques; Bodden, Lee; Boddy, Mark; White, Jim; Beane, John

    1994-01-01

    The Goddard Space Flight Center (GSFC) Distributed Active Archive Center (DAAC) has been operational since October 1, 1993. Its mission is to support the Earth Observing System (EOS) by providing rapid access to EOS data and analysis products, and to test Earth Observing System Data and Information System (EOSDIS) design concepts. One of the challenges is to ensure quick and easy retrieval of any data archived within the DAAC's Data Archive and Distributed System (DADS). Over the 15-year life of EOS project, an estimated several Petabytes (10(exp 15)) of data will be permanently stored. Accessing that amount of information is a formidable task that will require innovative approaches. As a precursor of the full EOS system, the GSFC DAAC with a few Terabits of storage, has implemented a prototype of a constraint-based task and resource scheduler to improve the performance of the DADS. This Honeywell Task and Resource Scheduler (HTRS), developed by Honeywell Technology Center in cooperation the Information Science and Technology Branch/935, the Code X Operations Technology Program, and the GSFC DAAC, makes better use of limited resources, prevents backlog of data, provides information about resources bottlenecks and performance characteristics. The prototype which is developed concurrently with the GSFC Version 0 (V0) DADS, models DADS activities such as ingestion and distribution with priority, precedence, resource requirements (disk and network bandwidth) and temporal constraints. HTRS supports schedule updates, insertions, and retrieval of task information via an Application Program Interface (API). The prototype has demonstrated with a few examples, the substantial advantages of using HTRS over scheduling algorithms such as a First In First Out (FIFO) queue. The kernel scheduling engine for HTRS, called Kronos, has been successfully applied to several other domains such as space shuttle mission scheduling, demand flow manufacturing, and avionics communications scheduling.

  2. Optimal Wind Power Uncertainty Intervals for Electricity Market Operation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Ying; Zhou, Zhi; Botterud, Audun

    It is important to select an appropriate uncertainty level of the wind power forecast for power system scheduling and electricity market operation. Traditional methods hedge against a predefined level of wind power uncertainty, such as a specific confidence interval or uncertainty set, which leaves the questions of how to best select the appropriate uncertainty levels. To bridge this gap, this paper proposes a model to optimize the forecast uncertainty intervals of wind power for power system scheduling problems, with the aim of achieving the best trade-off between economics and reliability. Then we reformulate and linearize the models into a mixedmore » integer linear programming (MILP) without strong assumptions on the shape of the probability distribution. In order to invest the impacts on cost, reliability, and prices in a electricity market, we apply the proposed model on a twosettlement electricity market based on a six-bus test system and on a power system representing the U.S. state of Illinois. The results show that the proposed method can not only help to balance the economics and reliability of the power system scheduling, but also help to stabilize the energy prices in electricity market operation.« less

  3. Optimal Power Scheduling for a Medium Voltage AC/DC Hybrid Distribution Network

    DOE PAGES

    Zhu, Zhenshan; Liu, Dichen; Liao, Qingfen; ...

    2018-01-26

    With the great increase of renewable generation as well as the DC loads in the distribution network; DC distribution technology is receiving more attention; since the DC distribution network can improve operating efficiency and power quality by reducing the energy conversion stages. This paper presents a new architecture for the medium voltage AC/DC hybrid distribution network; where the AC and DC subgrids are looped by normally closed AC soft open point (ACSOP) and DC soft open point (DCSOP); respectively. The proposed AC/DC hybrid distribution systems contain renewable generation (i.e., wind power and photovoltaic (PV) generation); energy storage systems (ESSs); softmore » open points (SOPs); and both AC and DC flexible demands. An energy management strategy for the hybrid system is presented based on the dynamic optimal power flow (DOPF) method. The main objective of the proposed power scheduling strategy is to minimize the operating cost and reduce the curtailment of renewable generation while meeting operational and technical constraints. The proposed approach is verified in five scenarios. The five scenarios are classified as pure AC system; hybrid AC/DC system; hybrid system with interlinking converter; hybrid system with DC flexible demand; and hybrid system with SOPs. Results show that the proposed scheduling method can successfully dispatch the controllable elements; and that the presented architecture for the AC/DC hybrid distribution system is beneficial for reducing operating cost and renewable generation curtailment.« less

  4. Optimal Power Scheduling for a Medium Voltage AC/DC Hybrid Distribution Network

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhu, Zhenshan; Liu, Dichen; Liao, Qingfen

    With the great increase of renewable generation as well as the DC loads in the distribution network; DC distribution technology is receiving more attention; since the DC distribution network can improve operating efficiency and power quality by reducing the energy conversion stages. This paper presents a new architecture for the medium voltage AC/DC hybrid distribution network; where the AC and DC subgrids are looped by normally closed AC soft open point (ACSOP) and DC soft open point (DCSOP); respectively. The proposed AC/DC hybrid distribution systems contain renewable generation (i.e., wind power and photovoltaic (PV) generation); energy storage systems (ESSs); softmore » open points (SOPs); and both AC and DC flexible demands. An energy management strategy for the hybrid system is presented based on the dynamic optimal power flow (DOPF) method. The main objective of the proposed power scheduling strategy is to minimize the operating cost and reduce the curtailment of renewable generation while meeting operational and technical constraints. The proposed approach is verified in five scenarios. The five scenarios are classified as pure AC system; hybrid AC/DC system; hybrid system with interlinking converter; hybrid system with DC flexible demand; and hybrid system with SOPs. Results show that the proposed scheduling method can successfully dispatch the controllable elements; and that the presented architecture for the AC/DC hybrid distribution system is beneficial for reducing operating cost and renewable generation curtailment.« less

  5. Scheduling with genetic algorithms

    NASA Technical Reports Server (NTRS)

    Fennel, Theron R.; Underbrink, A. J., Jr.; Williams, George P. W., Jr.

    1994-01-01

    In many domains, scheduling a sequence of jobs is an important function contributing to the overall efficiency of the operation. At Boeing, we develop schedules for many different domains, including assembly of military and commercial aircraft, weapons systems, and space vehicles. Boeing is under contract to develop scheduling systems for the Space Station Payload Planning System (PPS) and Payload Operations and Integration Center (POIC). These applications require that we respect certain sequencing restrictions among the jobs to be scheduled while at the same time assigning resources to the jobs. We call this general problem scheduling and resource allocation. Genetic algorithms (GA's) offer a search method that uses a population of solutions and benefits from intrinsic parallelism to search the problem space rapidly, producing near-optimal solutions. Good intermediate solutions are probabalistically recombined to produce better offspring (based upon some application specific measure of solution fitness, e.g., minimum flowtime, or schedule completeness). Also, at any point in the search, any intermediate solution can be accepted as a final solution; allowing the search to proceed longer usually produces a better solution while terminating the search at virtually any time may yield an acceptable solution. Many processes are constrained by restrictions of sequence among the individual jobs. For a specific job, other jobs must be completed beforehand. While there are obviously many other constraints on processes, it is these on which we focussed for this research: how to allocate crews to jobs while satisfying job precedence requirements and personnel, and tooling and fixture (or, more generally, resource) requirements.

  6. Wave scheduling - Decentralized scheduling of task forces in multicomputers

    NASA Technical Reports Server (NTRS)

    Van Tilborg, A. M.; Wittie, L. D.

    1984-01-01

    Decentralized operating systems that control large multicomputers need techniques to schedule competing parallel programs called task forces. Wave scheduling is a probabilistic technique that uses a hierarchical distributed virtual machine to schedule task forces by recursively subdividing and issuing wavefront-like commands to processing elements capable of executing individual tasks. Wave scheduling is highly resistant to processing element failures because it uses many distributed schedulers that dynamically assign scheduling responsibilities among themselves. The scheduling technique is trivially extensible as more processing elements join the host multicomputer. A simple model of scheduling cost is used by every scheduler node to distribute scheduling activity and minimize wasted processing capacity by using perceived workload to vary decentralized scheduling rules. At low to moderate levels of network activity, wave scheduling is only slightly less efficient than a central scheduler in its ability to direct processing elements to accomplish useful work.

  7. Wind Tunnel Management and Resource Optimization: A Systems Modeling Approach

    NASA Technical Reports Server (NTRS)

    Jacobs, Derya, A.; Aasen, Curtis A.

    2000-01-01

    Time, money, and, personnel are becoming increasingly scarce resources within government agencies due to a reduction in funding and the desire to demonstrate responsible economic efficiency. The ability of an organization to plan and schedule resources effectively can provide the necessary leverage to improve productivity, provide continuous support to all projects, and insure flexibility in a rapidly changing environment. Without adequate internal controls the organization is forced to rely on external support, waste precious resources, and risk an inefficient response to change. Management systems must be developed and applied that strive to maximize the utility of existing resources in order to achieve the goal of "faster, cheaper, better". An area of concern within NASA Langley Research Center was the scheduling, planning, and resource management of the Wind Tunnel Enterprise operations. Nine wind tunnels make up the Enterprise. Prior to this research, these wind tunnel groups did not employ a rigorous or standardized management planning system. In addition, each wind tunnel unit operated from a position of autonomy, with little coordination of clients, resources, or project control. For operating and planning purposes, each wind tunnel operating unit must balance inputs from a variety of sources. Although each unit is managed by individual Facility Operations groups, other stakeholders influence wind tunnel operations. These groups include, for example, the various researchers and clients who use the facility, the Facility System Engineering Division (FSED) tasked with wind tunnel repair and upgrade, the Langley Research Center (LaRC) Fabrication (FAB) group which fabricates repair parts and provides test model upkeep, the NASA and LARC Strategic Plans, and unscheduled use of the facilities by important clients. Expanding these influences horizontally through nine wind tunnel operations and vertically along the NASA management structure greatly increases the complexity of developing a model that can be used for successfully implementing a standardized management planning tool. The objective of this study was to implement an Integrated Wind Tunnel Planning System to improve the operations within the aeronautics testing and research group, in particular Wind Tunnel Enterprise. The study included following steps: Conducted literature search and expert discussions (NASA and Old Dominion University faculty), Performed environmental scan of NASA Langley wind tunnel operations as foundation for problem definition. Established operation requirements and evaluation methodologies. Examined windtunnel operations to map out the common characteristics, critical components, and system structure. Reviewed and evaluated various project scheduling and management systems for implementation, Evaluated and implemented "Theory of Constraints (TOC)" project scheduling methodology at NASA Langley wind tunnel operations together with NASA staff.

  8. A new technology for manufacturing scheduling derived from space system operations

    NASA Technical Reports Server (NTRS)

    Hornstein, R. S.; Willoughby, J. K.

    1993-01-01

    A new technology for producing finite capacity schedules has been developed in response to complex requirements for operating space systems such as the Space Shuttle, the Space Station, and the Deep Space Network for telecommunications. This technology has proven its effectiveness in manufacturing environments where popular scheduling techniques associated with Materials Resources Planning (MRPII) and with factory simulation are not adequate for shop-floor work planning and control. The technology has three components. The first is a set of data structures that accommodate an extremely general description of a factory's resources, its manufacturing activities, and the constraints imposed by the environment. The second component is a language and set of software utilities that enable a rapid synthesis of functional capabilities. The third component is an algorithmic architecture called the Five Ruleset Model which accommodates the unique needs of each factory. Using the new technology, systems can model activities that generate, consume, and/or obligate resources. This allows work-in-process (WIP) to be generated and used; it permits constraints to be imposed or intermediate as well as finished goods inventories. It is also possible to match as closely as possible both the current factory state and future conditions such as promise dates. Schedule revisions can be accommodated without impacting the entire production schedule. Applications have been successful in both discrete and process manufacturing environments. The availability of a high-quality finite capacity production planning capability enhances the data management capabilities of MRP II systems. These schedules can be integrated with shop-floor data collection systems and accounting systems. Using the new technology, semi-custom systems can be developed at costs that are comparable to products that do not have equivalent functional capabilities and/or extensibility.

  9. Sharing intelligence: Decision-making interactions between users and software in MAESTRO

    NASA Technical Reports Server (NTRS)

    Geoffroy, Amy L.; Gohring, John R.; Britt, Daniel L.

    1991-01-01

    By combining the best of automated and human decision-making in scheduling many advantages can accrue. The joint performance of the user and system is potentially much better than either alone. Features of the MAESTRO scheduling system serve to illustrate concepts of user/software cooperation. MAESTRO may be operated at a user-determinable and dynamic level of autonomy. Because the system allows so much flexibility in the allocation of decision-making responsibilities, and provides users with a wealth of information and other support for their own decision-making, better overall schedules may result.

  10. Towards a dynamical scheduler for ALMA: a science - software collaboration

    NASA Astrophysics Data System (ADS)

    Avarias, Jorge; Toledo, Ignacio; Espada, Daniel; Hibbard, John; Nyman, Lars-Ake; Hiriart, Rafael

    2016-07-01

    State-of-the art astronomical facilities are costly to build and operate, hence it is essential that these facilities must be operated as much efficiently as possible, trying to maximize the scientific output and at the same time minimizing overhead times. Over the latest decades the scheduling problem has drawn attention of research because new facilities have been demonstrated that is unfeasible to try to schedule observations manually, due the complexity to satisfy the astronomical and instrumental constraints and the number of scientific proposals to be reviewed and evaluated in near real-time. In addition, the dynamic nature of some constraints make this problem even more difficult. The Atacama Large Millimeter/submillimeter Array (ALMA) is a major collaboration effort between European (ESO), North American (NRAO) and East Asian countries (NAOJ), under operations on the Chilean Chajnantor plateau, at 5.000 meters of altitude. During normal operations at least two independent arrays are available, aiming to achieve different types of science. Since ALMA does not observe in the visible spectrum, observations are not limited to night time only, thus a 24/7 operation with little downtime as possible is expected when full operations state will have been reached. However, during preliminary operations (early-science) ALMA has been operated on tied schedules using around half of the whole day-time to conduct scientific observations. The purpose of this paper is to explain how the observation scheduling and its optimization is done within ALMA, giving details about the problem complexity, its similarities and differences with traditional scheduling problems found in the literature. The paper delves into the current recommendation system implementation and the difficulties found during the road to its deployment in production.

  11. flexplan: Mission Planning System for the Lunar Reconnaissance Orbiter

    NASA Technical Reports Server (NTRS)

    Barnoy, Assaf; Beech, Theresa

    2013-01-01

    flexplan is a mission planning and scheduling (MPS) tool that uses soft algorithms to define mission scheduling rules and constraints. This allows the operator to configure the tool for any mission without the need to modify or recompile code. In addition, flexplan uses an ID system to track every output on the schedule to the input from which it was generated. This allows flexplan to receive feedback as the schedules are executed, and update the status of all activities in a Web-based client. flexplan outputs include various planning reports, stored command loads for the Lunar Reconnaissance Orbiter (LRO), ephemeris loads, and pass scripts for automation.

  12. Missed deadline notification in best-effort schedulers

    NASA Astrophysics Data System (ADS)

    Banachowski, Scott A.; Wu, Joel; Brandt, Scott A.

    2003-12-01

    It is common to run multimedia and other periodic, soft real-time applications on general-purpose computer systems. These systems use best-effort scheduling algorithms that cannot guarantee applications will receive responsive scheduling to meet deadline or timing requirements. We present a simple mechanism called Missed Deadline Notification (MDN) that allows applications to notify the system when they do not receive their desired level of responsiveness. Consisting of a single system call with no arguments, this simple interface allows the operating system to provide better support for soft real-time applications without any a priori information about their timing or resource needs. We implemented MDN in three different schedulers: Linux, BEST, and BeRate. We describe these implementations and their performance when running real-time applications and discuss policies to prevent applications from abusing MDN to gain extra resources.

  13. Improved NSGA model for multi objective operation scheduling and its evaluation

    NASA Astrophysics Data System (ADS)

    Li, Weining; Wang, Fuyu

    2017-09-01

    Reasonable operation can increase the income of the hospital and improve the patient’s satisfactory level. In this paper, by using multi object operation scheduling method with improved NSGA algorithm, it shortens the operation time, reduces the operation costand lowers the operation risk, the multi-objective optimization model is established for flexible operation scheduling, through the MATLAB simulation method, the Pareto solution is obtained, the standardization of data processing. The optimal scheduling scheme is selected by using entropy weight -Topsis combination method. The results show that the algorithm is feasible to solve the multi-objective operation scheduling problem, and provide a reference for hospital operation scheduling.

  14. Rolling scheduling of electric power system with wind power based on improved NNIA algorithm

    NASA Astrophysics Data System (ADS)

    Xu, Q. S.; Luo, C. J.; Yang, D. J.; Fan, Y. H.; Sang, Z. X.; Lei, H.

    2017-11-01

    This paper puts forth a rolling modification strategy for day-ahead scheduling of electric power system with wind power, which takes the operation cost increment of unit and curtailed wind power of power grid as double modification functions. Additionally, an improved Nondominated Neighbor Immune Algorithm (NNIA) is proposed for solution. The proposed rolling scheduling model has further improved the operation cost of system in the intra-day generation process, enhanced the system’s accommodation capacity of wind power, and modified the key transmission section power flow in a rolling manner to satisfy the security constraint of power grid. The improved NNIA algorithm has defined an antibody preference relation model based on equal incremental rate, regulation deviation constraints and maximum & minimum technical outputs of units. The model can noticeably guide the direction of antibody evolution, and significantly speed up the process of algorithm convergence to final solution, and enhance the local search capability.

  15. Research on Power System Scheduling Improving Wind Power Accommodation Considering Thermal Energy Storage and Flexible Load

    NASA Astrophysics Data System (ADS)

    Zou, Chenlu; Cui, Xue; Wang, Heng; Zhou, Bin; Liu, Yang

    2018-01-01

    In the case of rapid development of wind power and heavy wind curtailment, the study of wind power accommodation of combined heat and power system has become the focus of attention. A two-stage scheduling model contains of wind power, thermal energy storage, CHP unit and flexible load were constructed. This model with the objective function of minimizing wind curtailment and the operation cost of units while taking into account of the total coal consumption of units, constraint of thermal energy storage and electricity-heat characteristic of CHP. This paper uses MICA to solve the problem of too many constraints and make the solution more feasible. A numerical example showed that the two stage decision scheduling model can consume more wind power, and it could provide a reference for combined heat and power system short-term operation

  16. Comparison of multiobjective evolutionary algorithms for operations scheduling under machine availability constraints.

    PubMed

    Frutos, M; Méndez, M; Tohmé, F; Broz, D

    2013-01-01

    Many of the problems that arise in production systems can be handled with multiobjective techniques. One of those problems is that of scheduling operations subject to constraints on the availability of machines and buffer capacity. In this paper we analyze different Evolutionary multiobjective Algorithms (MOEAs) for this kind of problems. We consider an experimental framework in which we schedule production operations for four real world Job-Shop contexts using three algorithms, NSGAII, SPEA2, and IBEA. Using two performance indexes, Hypervolume and R2, we found that SPEA2 and IBEA are the most efficient for the tasks at hand. On the other hand IBEA seems to be a better choice of tool since it yields more solutions in the approximate Pareto frontier.

  17. One tool - one team: the marriage of test and operations in a low-budget spacecraft development

    NASA Astrophysics Data System (ADS)

    Finley, Charles J.

    2006-05-01

    The Air Force Research Laboratory's Space Vehicles Directorate (AFRL/VS) and the Department of Defense Space Test Program (STP) are two organizations that have partnered on more than 85 missions since 1968 to develop, launch, and operate Research and Development, Test and Evaluation space missions. As valuable as these missions have been to the follow-on generation of Operational systems, they are consistently under-funded and forced to execute on excessively ambitious development schedules. Due to these constraints, space mission development teams that serve the RDT&E community are faced with a number of unique technical and programmatic challenges. AFRL and STP have taken various approaches throughout the mission lifecycle to accelerate their development schedules, without sacrificing cost or system reliability. In the areas of test and operations, they currently employ one of two strategies. Historically, they have sought to avoid the added cost and complexity associated with coupled development schedules and segregated the spacecraft development and test effort from the ground operations system development and test effort. However, because these efforts have far more in common than they have differences, they have more recently attempted to pursue parallel I&T and Operations development and readiness efforts. This paper seeks to compare and contrast the "decoupled test and operations" approach, used by such missions as C/NOFS and Coriolis, with the "coupled test and operations" approach, adopted by the XSS-11 and TacSat-2 missions.

  18. The Consolidated Planning and Scheduling System for Space Transportation and Space Station operations - Successful development experience

    NASA Technical Reports Server (NTRS)

    Hornstein, Rhoda S.; Willoughby, John K.; Gardner, Jo A.; Shinkle, Gerald L.

    1993-01-01

    In 1992, NASA made the decision to evolve a Consolidated Planning System (CPS) by adding the Space Transportation System (STS) requirements to the Space Station Freedom (SSF) planning software. This paper describes this evolutionary process, which began with a series of six-month design-build-test cycles, using a domain-independent architecture and a set of developmental tools known as the Advanced Scheduling Environment. It is shown that, during these tests, the CPS could be used at multiple organizational levels of planning and for integrating schedules from geographically distributed (including international) planning environments. The potential for using the CPS for other planning and scheduling tasks in the SSF program is being currently examined.

  19. A Study of the Operating Room Scheduling System at Tripler Army Medical Center, Hawaii

    DTIC Science & Technology

    1981-08-01

    PROCESSING CLASS V SYSTEM .... .......... . A BIBLIOGRAPHY ....... ........... . . . .. . ii ’I. INTRODUCTIO9 Development of the Problem Convinced that...of the most difficult administrativo tasks that a modern hospital must face, and proposed using a combination of a master posting sheet and a...deal with scheduling problems.9 This particular process also incorporates the two-room system doscribed earlier, and the author admits that this

  20. Reduction of Sleep Deprivation and Fatigue in Mass Transit Rail Operators.

    PubMed

    Haynes, Ajeenah L

    2017-08-01

    Sleep and work schedules differ considerably between rail workers and the broader U.S. workforce. Due to extended work hours and night shift schedules, train and engine service workers who operate passenger trains or move freight are most vulnerable to fatigue. This article addresses the need for comprehensive fatigue risk management systems (FRMS) for rail operators. Using a transactional ergonomic perspective, FRMS are discussed with a focus on fatigue education and administrative controls to reduce feelings of tiredness, low motivation, poor concentration, and low physical activity among mass transit rail operators. Recommendations for intervention implementation and evaluation are provided.

  1. Proceedings from the Workshop on Large-Grained Parallelism (2nd) Held in Hidden Valley, Pennsylvania on October 11-14, 1987.

    DTIC Science & Technology

    1987-11-01

    The purpose of the workshop was to bring together people whose interests lie in the areas of operating I systems , programming languages, and formal... operating system support, and applications. There were parallel discussions on scheduling and distributed languages, and on real-time and operating ...number of key challenges: * Distributed systems , languages, environments - Make transactions efficient. Integrate them into the operating system

  2. Real-time operating system timing jitter and its impact on motor control

    NASA Astrophysics Data System (ADS)

    Proctor, Frederick M.; Shackleford, William P.

    2001-12-01

    General-purpose microprocessors are increasingly being used for control applications due to their widespread availability and software support for non-control functions like networking and operator interfaces. Two classes of real-time operating systems (RTOS) exist for these systems. The traditional RTOS serves as the sole operating system, and provides all OS services. Examples include ETS, LynxOS, QNX, Windows CE and VxWorks. RTOS extensions add real-time scheduling capabilities to non-real-time OSes, and provide minimal services needed for the time-critical portions of an application. Examples include RTAI and RTL for Linux, and HyperKernel, OnTime and RTX for Windows NT. Timing jitter is an issue in these systems, due to hardware effects such as bus locking, caches and pipelines, and software effects from mutual exclusion resource locks, non-preemtible critical sections, disabled interrupts, and multiple code paths in the scheduler. Jitter is typically on the order of a microsecond to a few tens of microseconds for hard real-time operating systems, and ranges from milliseconds to seconds in the worst case for soft real-time operating systems. The question of its significance on the performance of a controller arises. Naturally, the smaller the scheduling period required for a control task, the more significant is the impact of timing jitter. Aside from this intuitive relationship is the greater significance of timing on open-loop control, such as for stepper motors, than for closed-loop control, such as for servo motors. Techniques for measuring timing jitter are discussed, and comparisons between various platforms are presented. Techniques to reduce jitter or mitigate its effects are presented. The impact of jitter on stepper motor control is analyzed.

  3. In-Space Crew-Collaborative Task Scheduling

    NASA Technical Reports Server (NTRS)

    Jaap, John; Meyer, Patrick; Davis, Elizabeth; Richardson, Lea

    2006-01-01

    As humans venture farther from Earth for longer durations, it will become essential for those on the journey to have significant control over the scheduling of their own activities as well as the activities of their companion systems and robots. However, the crew will not do all the scheduling; timelines will be the result of collaboration with ground personnel. Emerging technologies such as in-space message buses, delay-tolerant networks, and in-space internet will be the carriers on which the collaboration rides. Advances in scheduling technology, in the areas of task modeling, scheduling engines, and user interfaces will allow the crew to become virtual scheduling experts. New concepts of operations for producing the timeline will allow the crew and the ground support to collaborate while providing safeguards to ensure that the mission will be effectively accomplished without endangering the systems or personnel.

  4. Skylab hardware report operational bioinstrumentation system

    NASA Technical Reports Server (NTRS)

    Luczkowski, S.

    1977-01-01

    The Skylab Operational Bioinstrumentation System is a personal, individually adjustable biomedical system designed to monitor the basic physiological functions of each suited crewman during specified periods of a manned space mission. The basic physiological functions of this system include electrocardiogram, respiration by impedance pneumogram, body temperature, cardiotachometer, and subject identification. The Operational Bioinstrumentation System was scheduled to monitor each crewman during launch, extravehicular activities, suited intravehicular experiments, and undocking and return.

  5. Computer code for analyzing the performance of aquifer thermal energy storage systems

    NASA Astrophysics Data System (ADS)

    Vail, L. W.; Kincaid, C. T.; Kannberg, L. D.

    1985-05-01

    A code called Aquifer Thermal Energy Storage System Simulator (ATESSS) has been developed to analyze the operational performance of ATES systems. The ATESSS code provides an ability to examine the interrelationships among design specifications, general operational strategies, and unpredictable variations in the demand for energy. The uses of the code can vary the well field layout, heat exchanger size, and pumping/injection schedule. Unpredictable aspects of supply and demand may also be examined through the use of a stochastic model of selected system parameters. While employing a relatively simple model of the aquifer, the ATESSS code plays an important role in the design and operation of ATES facilities by augmenting experience provided by the relatively few field experiments and demonstration projects. ATESSS has been used to characterize the effect of different pumping/injection schedules on a hypothetical ATES system and to estimate the recovery at the St. Paul, Minnesota, field experiment.

  6. Coordinated Science Campaign Scheduling for Sensor Webs

    NASA Technical Reports Server (NTRS)

    Edgington, Will; Morris, Robert; Dungan, Jennifer; Williams, Jenny; Carlson, Jean; Fleming, Damian; Wood, Terri; Yorke-Smith, Neil

    2005-01-01

    Future Earth observing missions will study different aspects and interacting pieces of the Earth's eco-system. Scientists are designing increasingly complex, interdisciplinary campaigns to exploit the diverse capabilities of multiple Earth sensing assets. In addition, spacecraft platforms are being configured into clusters, trains, or other distributed organizations in order to improve either the quality or the coverage of observations. These simultaneous advances in the design of science campaigns and in the missions that will provide the sensing resources to support them offer new challenges in the coordination of data and operations that are not addressed by current practice. For example, the scheduling of scientific observations for satellites in low Earth orbit is currently conducted independently by each mission operations center. An absence of an information infrastructure to enable the scheduling of coordinated observations involving multiple sensors makes it difficult to execute campaigns involving multiple assets. This paper proposes a software architecture and describes a prototype system called DESOPS (Distributed Earth Science Observation Planning and Scheduling) that will address this deficiency.

  7. An expert system for scheduling requests for communications Links between TDRSS and ERBS

    NASA Technical Reports Server (NTRS)

    Mclean, David R.; Littlefield, Ronald G.; Beyer, David S.

    1987-01-01

    An ERBS-TDRSS Contact Planning System (ERBS-TDRSS CPS) is described which uses a graphics interface and the NASA Transportable Interference Engine. The procedure involves transfer of the ERBS-TDRSS Ground Track Orbit Prediction data to the ERBS flight operations area, where the ERBS-TDRSS CPS automatically generates requests for TDRSS service. As requested events are rejected, alternative context sensitive strategies are employed to generate new requested events until a schedule is completed. A report generator builds schedule requests for separate ERBS-TDRSS contacts.

  8. A decision support system for real-time hydropower scheduling in a competitive power market environment

    NASA Astrophysics Data System (ADS)

    Shawwash, Ziad Khaled Elias

    2000-10-01

    The electricity supply market is rapidly changing from a monopolistic to a competitive environment. Being able to operate their system of reservoirs and generating facilities to get maximum benefits out of existing assets and resources is important to the British Columbia Hydro Authority (B.C. Hydro). A decision support system has been developed to help B.C. Hydro operate their system in an optimal way. The system is operational and is one of the tools that are currently used by the B.C. Hydro system operations engineers to determine optimal schedules that meet the hourly domestic load and also maximize the value B.C. Hydro obtains from spot transactions in the Western U.S. and Alberta electricity markets. This dissertation describes the development and implementation of the decision support system in production mode. The decision support system consists of six components: the input data preparation routines, the graphical user interface (GUI), the communication protocols, the hydraulic simulation model, the optimization model, and the results display software. A major part of this work involved the development and implementation of a practical and detailed large-scale optimization model that determines the optimal tradeoff between the long-term value of water and the returns from spot trading transactions in real-time operations. The postmortem-testing phase showed that the gains in value from using the model accounted for 0.25% to 1.0% of the revenues obtained. The financial returns from using the decision support system greatly outweigh the costs of building it. Other benefits are the savings in the time needed to prepare the generation and trading schedules. The system operations engineers now can use the time saved to focus on other important aspects of their job. The operators are currently experimenting with the system in production mode, and are gradually gaining confidence that the advice it provides is accurate, reliable and sensible. The main lesson learned from developing and implementing the system was that there is no alternative to working very closely with the intended end-users of the system, and with the people who have deep knowledge, experience and understanding of how the system is and should be operated.

  9. Operating Systems. Curriculum Improvement Project. Region II.

    ERIC Educational Resources Information Center

    Wagstaff, Charlene

    This course curriculum is intended for community college instructors and administrators to use in implementing an operating systems course. A student's course syllabus provides this information: credit hours, catalog description, prerequisites, required texts, instructional process, objectives, student evaluation, and class schedule. A student…

  10. Prediction based proactive thermal virtual machine scheduling in green clouds.

    PubMed

    Kinger, Supriya; Kumar, Rajesh; Sharma, Anju

    2014-01-01

    Cloud computing has rapidly emerged as a widely accepted computing paradigm, but the research on Cloud computing is still at an early stage. Cloud computing provides many advanced features but it still has some shortcomings such as relatively high operating cost and environmental hazards like increasing carbon footprints. These hazards can be reduced up to some extent by efficient scheduling of Cloud resources. Working temperature on which a machine is currently running can be taken as a criterion for Virtual Machine (VM) scheduling. This paper proposes a new proactive technique that considers current and maximum threshold temperature of Server Machines (SMs) before making scheduling decisions with the help of a temperature predictor, so that maximum temperature is never reached. Different workload scenarios have been taken into consideration. The results obtained show that the proposed system is better than existing systems of VM scheduling, which does not consider current temperature of nodes before making scheduling decisions. Thus, a reduction in need of cooling systems for a Cloud environment has been obtained and validated.

  11. 46 CFR 525.2 - Terminal schedules.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... scrap, new assembled motor vehicles, waste paper and paper waste in terminal schedules. (2) Marine... MARITIME COMMISSION REGULATIONS AFFECTING OCEAN SHIPPING IN FOREIGN COMMERCE MARINE TERMINAL OPERATOR SCHEDULES § 525.2 Terminal schedules. (a) Marine terminal operator schedules. A marine terminal operator, at...

  12. 46 CFR 525.2 - Terminal schedules.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... scrap, new assembled motor vehicles, waste paper and paper waste in terminal schedules. (2) Marine... MARITIME COMMISSION REGULATIONS AFFECTING OCEAN SHIPPING IN FOREIGN COMMERCE MARINE TERMINAL OPERATOR SCHEDULES § 525.2 Terminal schedules. (a) Marine terminal operator schedules. A marine terminal operator, at...

  13. Re-scheduling as a tool for the power management on board a spacecraft

    NASA Technical Reports Server (NTRS)

    Albasheer, Omar; Momoh, James A.

    1995-01-01

    The scheduling of events on board a spacecraft is based on forecast energy levels. The real time values of energy may not coincide with the forecast values; consequently, a dynamic revising to the allocation of power is needed. The re-scheduling is also needed for other reasons on board a spacecraft like the addition of new event which must be scheduled, or a failure of an event due to many different contingencies. This need of rescheduling is very important to the survivability of the spacecraft. In this presentation, a re-scheduling tool will be presented as a part of an overall scheme for the power management on board a spacecraft from the allocation of energy point of view. The overall scheme is based on the optimal use of energy available on board a spacecraft using expert systems combined with linear optimization techniques. The system will be able to schedule maximum number of events utilizing most energy available. The outcome is more events scheduled to share the operation cost of that spacecraft. The system will also be able to re-schedule in case of a contingency with minimal time and minimal disturbance of the original schedule. The end product is a fully integrated planning system capable of producing the right decisions in short time with less human error. The overall system will be presented with the re-scheduling algorithm discussed in detail, then the tests and results will be presented for validations.

  14. Systems cost/performance analysis (study 2.3). Volume 2: Systems cost/performance model. [unmanned automated payload programs and program planning

    NASA Technical Reports Server (NTRS)

    Campbell, B. H.

    1974-01-01

    A methodology which was developed for balanced designing of spacecraft subsystems and interrelates cost, performance, safety, and schedule considerations was refined. The methodology consists of a two-step process: the first step is one of selecting all hardware designs which satisfy the given performance and safety requirements, the second step is one of estimating the cost and schedule required to design, build, and operate each spacecraft design. Using this methodology to develop a systems cost/performance model allows the user of such a model to establish specific designs and the related costs and schedule. The user is able to determine the sensitivity of design, costs, and schedules to changes in requirements. The resulting systems cost performance model is described and implemented as a digital computer program.

  15. Research on Scheduling Algorithm for Multi-satellite and Point Target Task on Swinging Mode

    NASA Astrophysics Data System (ADS)

    Wang, M.; Dai, G.; Peng, L.; Song, Z.; Chen, G.

    2012-12-01

    Nowadays, using satellite in space to observe ground is an important and major method to obtain ground information. With the development of the scientific technology in the field of space, many fields such as military and economic and other areas have more and more requirement of space technology because of the benefits of the satellite's widespread, timeliness and unlimited of area and country. And at the same time, because of the wide use of all kinds of satellites, sensors, repeater satellites and ground receiving stations, ground control system are now facing great challenge. Therefore, how to make the best value of satellite resources so as to make full use of them becomes an important problem of ground control system. Satellite scheduling is to distribute the resource to all tasks without conflict to obtain the scheduling result so as to complete as many tasks as possible to meet user's requirement under considering the condition of the requirement of satellites, sensors and ground receiving stations. Considering the size of the task, we can divide tasks into point task and area task. This paper only considers point targets. In this paper, a description of satellite scheduling problem and a chief introduction of the theory of satellite scheduling are firstly made. We also analyze the restriction of resource and task in scheduling satellites. The input and output flow of scheduling process are also chiefly described in the paper. On the basis of these analyses, we put forward a scheduling model named as multi-variable optimization model for multi-satellite and point target task on swinging mode. In the multi-variable optimization model, the scheduling problem is transformed the parametric optimization problem. The parameter we wish to optimize is the swinging angle of every time-window. In the view of the efficiency and accuracy, some important problems relating the satellite scheduling such as the angle relation between satellites and ground targets, positive and negative swinging angle and the computation of time window are analyzed and discussed. And many strategies to improve the efficiency of this model are also put forward. In order to solve the model, we bring forward the conception of activity sequence map. By using the activity sequence map, the activity choice and the start time of the activity can be divided. We also bring forward three neighborhood operators to search the result space. The front movement remaining time and the back movement remaining time are used to analyze the feasibility to generate solution from neighborhood operators. Lastly, the algorithm to solve the problem and model is put forward based genetic algorithm. Population initialization, crossover operator, mutation operator, individual evaluation, collision decrease operator, select operator and collision elimination operator is designed in the paper. Finally, the scheduling result and the simulation for a practical example on 5 satellites and 100 point targets with swinging mode is given, and the scheduling performances are also analyzed while the swinging angle in 0, 5, 10, 15, 25. It can be shown by the result that the model and the algorithm are more effective than those ones without swinging mode.

  16. Short-term scheduling of crude oil operations in refinery with high-fusion-point oil and two transportation pipelines

    NASA Astrophysics Data System (ADS)

    Wu, NaiQi; Zhu, MengChu; Bai, LiPing; Li, ZhiWu

    2016-07-01

    In some refineries, storage tanks are located at two different sites, one for low-fusion-point crude oil and the other for high one. Two pipelines are used to transport different oil types. Due to the constraints resulting from the high-fusion-point oil transportation, it is challenging to schedule such a system. This work studies the scheduling problem from a control-theoretic perspective. It proposes to use a hybrid Petri net method to model the system. It then finds the schedulability conditions by analysing the dynamic behaviour of the net model. Next, it proposes an efficient scheduling method to minimize the cost of high-fusion-point oil transportation. Finally, it gives a complex industrial case study to show its application.

  17. 76 FR 76713 - California Independent System Operator Corporation; Notice of Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-08

    ...) proposal to eliminate convergence bidding at intertie scheduling points. Take notice that such conference...'s proposal to eliminate convergence bidding at intertie scheduling points. A subsequent notice... Act of 1973. For accessibility accommodations please send an email to [email protected] or call...

  18. Scheduling Operations for Massive Heterogeneous Clusters

    NASA Technical Reports Server (NTRS)

    Humphrey, John; Spagnoli, Kyle

    2013-01-01

    High-performance computing (HPC) programming has become increasingly difficult with the advent of hybrid supercomputers consisting of multicore CPUs and accelerator boards such as the GPU. Manual tuning of software to achieve high performance on this type of machine has been performed by programmers. This is needlessly difficult and prone to being invalidated by new hardware, new software, or changes in the underlying code. A system was developed for task-based representation of programs, which when coupled with a scheduler and runtime system, allows for many benefits, including higher performance and utilization of computational resources, easier programming and porting, and adaptations of code during runtime. The system consists of a method of representing computer algorithms as a series of data-dependent tasks. The series forms a graph, which can be scheduled for execution on many nodes of a supercomputer efficiently by a computer algorithm. The schedule is executed by a dispatch component, which is tailored to understand all of the hardware types that may be available within the system. The scheduler is informed by a cluster mapping tool, which generates a topology of available resources and their strengths and communication costs. Software is decoupled from its hardware, which aids in porting to future architectures. A computer algorithm schedules all operations, which for systems of high complexity (i.e., most NASA codes), cannot be performed optimally by a human. The system aids in reducing repetitive code, such as communication code, and aids in the reduction of redundant code across projects. It adds new features to code automatically, such as recovering from a lost node or the ability to modify the code while running. In this project, the innovators at the time of this reporting intend to develop two distinct technologies that build upon each other and both of which serve as building blocks for more efficient HPC usage. First is the scheduling and dynamic execution framework, and the second is scalable linear algebra libraries that are built directly on the former.

  19. Integrated Dynamic Process Planning and Scheduling in Flexible Manufacturing Systems via Autonomous Agents

    NASA Astrophysics Data System (ADS)

    Nejad, Hossein Tehrani Nik; Sugimura, Nobuhiro; Iwamura, Koji; Tanimizu, Yoshitaka

    Process planning and scheduling are important manufacturing planning activities which deal with resource utilization and time span of manufacturing operations. The process plans and the schedules generated in the planning phase shall be modified in the execution phase due to the disturbances in the manufacturing systems. This paper deals with a multi-agent architecture of an integrated and dynamic system for process planning and scheduling for multi jobs. A negotiation protocol is discussed, in this paper, to generate the process plans and the schedules of the manufacturing resources and the individual jobs, dynamically and incrementally, based on the alternative manufacturing processes. The alternative manufacturing processes are presented by the process plan networks discussed in the previous paper, and the suitable process plans and schedules are searched and generated to cope with both the dynamic status and the disturbances of the manufacturing systems. We initiatively combine the heuristic search algorithms of the process plan networks with the negotiation protocols, in order to generate suitable process plans and schedules in the dynamic manufacturing environment. A simulation software has been developed to carry out case studies, aimed at verifying the performance of the proposed multi-agent architecture.

  20. Using Knowledge Base for Event-Driven Scheduling of Web Monitoring Systems

    NASA Astrophysics Data System (ADS)

    Kim, Yang Sok; Kang, Sung Won; Kang, Byeong Ho; Compton, Paul

    Web monitoring systems report any changes to their target web pages by revisiting them frequently. As they operate under significant resource constraints, it is essential to minimize revisits while ensuring minimal delay and maximum coverage. Various statistical scheduling methods have been proposed to resolve this problem; however, they are static and cannot easily cope with events in the real world. This paper proposes a new scheduling method that manages unpredictable events. An MCRDR (Multiple Classification Ripple-Down Rules) document classification knowledge base was reused to detect events and to initiate a prompt web monitoring process independent of a static monitoring schedule. Our experiment demonstrates that the approach improves monitoring efficiency significantly.

  1. Research on schedulers for astronomical observatories

    NASA Astrophysics Data System (ADS)

    Colome, Josep; Colomer, Pau; Guàrdia, Josep; Ribas, Ignasi; Campreciós, Jordi; Coiffard, Thierry; Gesa, Lluis; Martínez, Francesc; Rodler, Florian

    2012-09-01

    The main task of a scheduler applied to astronomical observatories is the time optimization of the facility and the maximization of the scientific return. Scheduling of astronomical observations is an example of the classical task allocation problem known as the job-shop problem (JSP), where N ideal tasks are assigned to M identical resources, while minimizing the total execution time. A problem of higher complexity, called the Flexible-JSP (FJSP), arises when the tasks can be executed by different resources, i.e. by different telescopes, and it focuses on determining a routing policy (i.e., which machine to assign for each operation) other than the traditional scheduling decisions (i.e., to determine the starting time of each operation). In most cases there is no single best approach to solve the planning system and, therefore, various mathematical algorithms (Genetic Algorithms, Ant Colony Optimization algorithms, Multi-Objective Evolutionary algorithms, etc.) are usually considered to adapt the application to the system configuration and task execution constraints. The scheduling time-cycle is also an important ingredient to determine the best approach. A shortterm scheduler, for instance, has to find a good solution with the minimum computation time, providing the system with the capability to adapt the selected task to varying execution constraints (i.e., environment conditions). We present in this contribution an analysis of the task allocation problem and the solutions currently in use at different astronomical facilities. We also describe the schedulers for three different projects (CTA, CARMENES and TJO) where the conclusions of this analysis are applied to develop a suitable routine.

  2. Comparison of Multiobjective Evolutionary Algorithms for Operations Scheduling under Machine Availability Constraints

    PubMed Central

    Frutos, M.; Méndez, M.; Tohmé, F.; Broz, D.

    2013-01-01

    Many of the problems that arise in production systems can be handled with multiobjective techniques. One of those problems is that of scheduling operations subject to constraints on the availability of machines and buffer capacity. In this paper we analyze different Evolutionary multiobjective Algorithms (MOEAs) for this kind of problems. We consider an experimental framework in which we schedule production operations for four real world Job-Shop contexts using three algorithms, NSGAII, SPEA2, and IBEA. Using two performance indexes, Hypervolume and R2, we found that SPEA2 and IBEA are the most efficient for the tasks at hand. On the other hand IBEA seems to be a better choice of tool since it yields more solutions in the approximate Pareto frontier. PMID:24489502

  3. SIRTF Science Operations System Design

    NASA Technical Reports Server (NTRS)

    Green, William

    1999-01-01

    SIRTF Science Operations System Design William B. Green Manager, SIRTF Science Center California Institute of Technology M/S 310-6 1200 E. California Blvd., Pasadena CA 91125 (626) 395 8572 Fax (626) 568 0673 bgreen@ipac.caltech.edu. The Space Infrared Telescope Facility (SIRTF) will be launched in December 2001, and perform an extended series of science observations at wavelengths ranging from 20 to 160 microns for five years or more. The California Institute of Technology has been selected as the home for the SIRTF Science Center (SSC). The SSC will be responsible for evaluating and selecting observation proposals, providing technical support to the science community, performing mission planning and science observation scheduling activities, instrument calibration during operations and instrument health monitoring, production of archival quality data products, and management of science research grants. The science payload consists of three instruments delivered by instrument Principal Investigators located at University of Arizona, Cornell, and Harvard Smithsonian Astrophysical Observatory. The SSC is responsible for design, development, and operation of the Science Operations System (SOS) which will support the functions assigned to the SSC by NASA. The SIRTF spacecraft, mission profile, and science instrument design have undergone almost ten years of refinement. SIRTF development and operations activities are highly cost constrained. The cost constraints have impacted the design of the SOS in several ways. The Science Operations System has been designed to incorporate a set of efficient, easy to use tools which will make it possible for scientists to propose observation sequences in a rapid and automated manner. The use of highly automated tools for requesting observations will simplify the long range observatory scheduling process, and the short term scheduling of science observations. Pipeline data processing will be highly automated and data-driven, utilizing a variety of tools developed at JPL, the instrument development teams, and Space Telescope Science Institute to automate processing. An incremental ground data system development approach has been adopted, featuring periodic deliveries that are validated with the flight hardware throughout the various phases of system level development and testing. This approach minimizes development time and decreases operations risk. This paper will describe the top level architecture of the SOS and the basic design concepts. A summary of the incremental development approach will be presented. Examples of the unique science user tools now under final development prior to the first proposal call scheduled for mid-2000 will be shown.

  4. 14 CFR 234.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...: Cancelled flight means a flight operation that was not operated, but was listed in a carrier's computer... dropped from a carrier's computer reservation system more than seven calendar days before its scheduled... reporting to computer reservations system vendors, flight also means one-stop or multi-stop single plane...

  5. 14 CFR 234.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...: Cancelled flight means a flight operation that was not operated, but was listed in a carrier's computer... dropped from a carrier's computer reservation system more than seven calendar days before its scheduled... reporting to computer reservations system vendors, flight also means one-stop or multi-stop single plane...

  6. 14 CFR 234.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...: Cancelled flight means a flight operation that was not operated, but was listed in a carrier's computer... dropped from a carrier's computer reservation system more than seven calendar days before its scheduled... reporting to computer reservations system vendors, flight also means one-stop or multi-stop single plane...

  7. 14 CFR 234.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...: Cancelled flight means a flight operation that was not operated, but was listed in a carrier's computer... dropped from a carrier's computer reservation system more than seven calendar days before its scheduled... reporting to computer reservations system vendors, flight also means one-stop or multi-stop single plane...

  8. 14 CFR 234.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...: Cancelled flight means a flight operation that was not operated, but was listed in a carrier's computer... dropped from a carrier's computer reservation system more than seven calendar days before its scheduled... reporting to computer reservations system vendors, flight also means one-stop or multi-stop single plane...

  9. Research Perspectives for Material Requirements Planning Systems. Paper No. 434.

    ERIC Educational Resources Information Center

    Berry, W. L.; Whybark, D. Clay

    Material requirements planning (MRP) systems are described as management tools for planning and controlling production operations. A wide variety of industries and production organizations are credited as reporting significant operating improvements in such areas as inventory control, production scheduling, delivery performance, and production…

  10. Chance-Constrained Day-Ahead Hourly Scheduling in Distribution System Operation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jiang, Huaiguang; Zhang, Yingchen; Muljadi, Eduard

    This paper aims to propose a two-step approach for day-ahead hourly scheduling in a distribution system operation, which contains two operation costs, the operation cost at substation level and feeder level. In the first step, the objective is to minimize the electric power purchase from the day-ahead market with the stochastic optimization. The historical data of day-ahead hourly electric power consumption is used to provide the forecast results with the forecasting error, which is presented by a chance constraint and formulated into a deterministic form by Gaussian mixture model (GMM). In the second step, the objective is to minimize themore » system loss. Considering the nonconvexity of the three-phase balanced AC optimal power flow problem in distribution systems, the second-order cone program (SOCP) is used to relax the problem. Then, a distributed optimization approach is built based on the alternating direction method of multiplier (ADMM). The results shows that the validity and effectiveness method.« less

  11. Remote Collaboration on Task Scheduling for Humans at Mars

    NASA Technical Reports Server (NTRS)

    Jaap, John; Meyer, Patrick; Davis, Elizabeth; Richardson, Lea

    2006-01-01

    As humans venture farther from Earth for longer durations, it will become essential for those on the journey to have significant control over the scheduling of their own activities as well as the activities of their companion systems and robots. However, the crew will not do all the scheduling; timelines will be the result of collaboration with ground personnel. Emerging technologies such as in-space message buses, delay-tolerant networks, and in-space internet will be the carriers on which the collaboration rides. Advances in scheduling technology, in the areas of task modeling, scheduling engines, and user interfaces will allow the crew to become virtual scheduling experts. New concepts of operations for producing the timeline will allow the crew and the ground support to collaborate while providing safeguards to ensure that the mission will be effectively accomplished without endangering the systems or personnel.

  12. In-Space Crew-Collaborative Task Scheduling

    NASA Technical Reports Server (NTRS)

    Jaap, John; Meyer, Patrick; Davis, Elizabeth; Richardson, Lea

    2006-01-01

    As humans venture farther from earth for longer durations, it will become essential for those on the journey to have significant control over the scheduling of their own activities as well as the activities of their companion systems and robots. However, there are many reasons why the crew will not do all the scheduling; timelines will be the result of collaboration with ground personnel. Emerging technologies such as in-space message buses, delay-tolerant networks, and in-space internet will be the carriers on which the collaboration rides. Advances in scheduling technology, in the areas of task modeling, scheduling engines, and user interfaces will allow the crew to become virtual scheduling experts. New concepts of operations for producing the timeline will allow the crew and the ground support to collaborate while providing safeguards to ensure that the mission will be effectively accomplished without endangering the systems or personnel.

  13. Real-Time Embedded High Performance Computing: Communications Scheduling.

    DTIC Science & Technology

    1995-06-01

    real - time operating system must explicitly limit the degradation of the timing performance of all processes as the number of processes...adequately supported by a real - time operating system , could compound the development problems encountered in the past. Many experts feel that the... real - time operating system support for an MPP, although they all provide some support for distributed real-time applications. A distributed real

  14. Terminal-area STOL operating systems experiments program

    NASA Technical Reports Server (NTRS)

    Smith, D. W.; Watson, D.; Christensen, J. V.

    1973-01-01

    Information which will aid in the choice by the U.S. Government and industry of system concepts, design criteria, operating procedures for STOL aircraft and STOL ports, STOL landing guidance systems, air traffic control systems, and airborne avionics and flight control systems. Ames has developed a terminal-area STOL operating systems experiments program which is a part of the joint DOT/NASA effort is discussed. The Ames operating systems experiments program, its objectives, the program approach, the program schedule, typical experiments, the research facilities to be used, and the program status are described.

  15. Requirements and specifications of the space telescope for scientific operations

    NASA Technical Reports Server (NTRS)

    West, D. K.

    1976-01-01

    Requirements for the scientific operations of the Space Telescope and the Science Institute are used to develop operational interfaces between user scientists and the NASA ground system. General data systems are defined for observatory scheduling, daily science planning, and science data management. Hardware, software, manpower, and space are specified for several science institute locations and support options.

  16. Monitoring of GPS(Global Positioning System) System Performance

    DOT National Transportation Integrated Search

    1985-06-01

    The Global Positioning System (GPS), a worldwide satellite-based navigation system developed by the Department of Defense, is scheduled to become operational in late 1988. The system has the potential to become the primary radionaviagation system for...

  17. A transportation-scheduling system for managing silvicultural projects

    Treesearch

    Jorge F. Valenzuela; H. Hakan Balci; Timothy McDonald

    2005-01-01

    A silvicultural project encompasses tasks such as sitelevel planning, regeneration, harvestin, and stand-tending treatments. an essential problem in managing silvicultural projects is to efficiently schedule the operations while considering project task due dates and costs of moving scarce resources to specific job locations. Transportation costs represent a...

  18. Integrating Solar PV in Utility System Operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mills, A.; Botterud, A.; Wu, J.

    2013-10-31

    This study develops a systematic framework for estimating the increase in operating costs due to uncertainty and variability in renewable resources, uses the framework to quantify the integration costs associated with sub-hourly solar power variability and uncertainty, and shows how changes in system operations may affect these costs. Toward this end, we present a statistical method for estimating the required balancing reserves to maintain system reliability along with a model for commitment and dispatch of the portfolio of thermal and renewable resources at different stages of system operations. We estimate the costs of sub-hourly solar variability, short-term forecast errors, andmore » day-ahead (DA) forecast errors as the difference in production costs between a case with “realistic” PV (i.e., subhourly solar variability and uncertainty are fully included in the modeling) and a case with “well behaved” PV (i.e., PV is assumed to have no sub-hourly variability and can be perfectly forecasted). In addition, we highlight current practices that allow utilities to compensate for the issues encountered at the sub-hourly time frame with increased levels of PV penetration. In this analysis we use the analytical framework to simulate utility operations with increasing deployment of PV in a case study of Arizona Public Service Company (APS), a utility in the southwestern United States. In our analysis, we focus on three processes that are important in understanding the management of PV variability and uncertainty in power system operations. First, we represent the decisions made the day before the operating day through a DA commitment model that relies on imperfect DA forecasts of load and wind as well as PV generation. Second, we represent the decisions made by schedulers in the operating day through hour-ahead (HA) scheduling. Peaking units can be committed or decommitted in the HA schedules and online units can be redispatched using forecasts that are improved relative to DA forecasts, but still imperfect. Finally, we represent decisions within the operating hour by schedulers and transmission system operators as real-time (RT) balancing. We simulate the DA and HA scheduling processes with a detailed unit-commitment (UC) and economic dispatch (ED) optimization model. This model creates a least-cost dispatch and commitment plan for the conventional generating units using forecasts and reserve requirements as inputs. We consider only the generation units and load of the utility in this analysis; we do not consider opportunities to trade power with neighboring utilities. We also do not consider provision of reserves from renewables or from demand-side options. We estimate dynamic reserve requirements in order to meet reliability requirements in the RT operations, considering the uncertainty and variability in load, solar PV, and wind resources. Balancing reserve requirements are based on the 2.5th and 97.5th percentile of 1-min deviations from the HA schedule in a previous year. We then simulate RT deployment of balancing reserves using a separate minute-by-minute simulation of deviations from the HA schedules in the operating year. In the simulations we assume that balancing reserves can be fully deployed in 10 min. The minute-by-minute deviations account for HA forecasting errors and the actual variability of the load, wind, and solar generation. Using these minute-by-minute deviations and deployment of balancing reserves, we evaluate the impact of PV on system reliability through the calculation of the standard reliability metric called Control Performance Standard 2 (CPS2). Broadly speaking, the CPS2 score measures the percentage of 10-min periods in which a balancing area is able to balance supply and demand within a specific threshold. Compliance with the North American Electric Reliability Corporation (NERC) reliability standards requires that the CPS2 score must exceed 90% (i.e., the balancing area must maintain adequate balance for 90% of the 10-min periods). The combination of representing DA forecast errors in the DA commitments, using 1-min PV data to simulate RT balancing, and estimates of reliability performance through the CPS2 metric, all factors that are important to operating systems with increasing amounts of PV, makes this study unique in its scope.« less

  19. TDRSS operations control analysis study

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The use of an operational Tracking and Data Relay Satellite System (TDRSS) and the remaining ground stations for the STDN (GSTDN) was investigated. The operational aspects of TDRSS concepts, GSTDN as a 14-site network, and GSTDN as a 7 site-network were compared and operations control concepts for the configurations developed. Man/machine interface, scheduling system, and hardware/software tradeoff analyses were among the factors considered in the analysis.

  20. Autonomously Generating Operations Sequences for a Mars Rover Using Artificial Intelligence-Based Planning

    NASA Astrophysics Data System (ADS)

    Sherwood, R.; Mutz, D.; Estlin, T.; Chien, S.; Backes, P.; Norris, J.; Tran, D.; Cooper, B.; Rabideau, G.; Mishkin, A.; Maxwell, S.

    2001-07-01

    This article discusses a proof-of-concept prototype for ground-based automatic generation of validated rover command sequences from high-level science and engineering activities. This prototype is based on ASPEN, the Automated Scheduling and Planning Environment. This artificial intelligence (AI)-based planning and scheduling system will automatically generate a command sequence that will execute within resource constraints and satisfy flight rules. An automated planning and scheduling system encodes rover design knowledge and uses search and reasoning techniques to automatically generate low-level command sequences while respecting rover operability constraints, science and engineering preferences, environmental predictions, and also adhering to hard temporal constraints. This prototype planning system has been field-tested using the Rocky 7 rover at JPL and will be field-tested on more complex rovers to prove its effectiveness before transferring the technology to flight operations for an upcoming NASA mission. Enabling goal-driven commanding of planetary rovers greatly reduces the requirements for highly skilled rover engineering personnel. This in turn greatly reduces mission operations costs. In addition, goal-driven commanding permits a faster response to changes in rover state (e.g., faults) or science discoveries by removing the time-consuming manual sequence validation process, allowing rapid "what-if" analyses, and thus reducing overall cycle times.

  1. Networked Microgrids for Self-healing Power Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Zhaoyu; Chen, Bokan; Wang, Jianhui

    This paper proposes a transformative architecture for the normal operation and self-healing of networked microgrids (MGs). MGs can support and interchange electricity with each other in the proposed infrastructure. The networked MGs are connected by a physical common bus and a designed two-layer cyber communication network. The lower layer is within each MG where the energy management system (EMS) schedules the MG operation; the upper layer links a number of EMSs for global optimization and communication. In the normal operation mode, the objective is to schedule dispatchable distributed generators (DGs), energy storage systems (ESs) and controllable loads to minimize themore » operation costs and maximize the supply adequacy of each MG. When a generation deficiency or fault happens in a MG, the model switches to the self-healing mode and the local generation capacities of other MGs can be used to support the on-emergency portion of the system. A consensus algorithm is used to distribute portions of the desired power support to each individual MG in a decentralized way. The allocated portion corresponds to each MG’s local power exchange target which is used by its EMS to perform the optimal schedule. The resultant aggregated power output of networked MGs will be used to provide the requested power support. Test cases demonstrate the effectiveness of the proposed methodology.« less

  2. SUMO: operation and maintenance management web tool for astronomical observatories

    NASA Astrophysics Data System (ADS)

    Mujica-Alvarez, Emma; Pérez-Calpena, Ana; García-Vargas, María. Luisa

    2014-08-01

    SUMO is an Operation and Maintenance Management web tool, which allows managing the operation and maintenance activities and resources required for the exploitation of a complex facility. SUMO main capabilities are: information repository, assets and stock control, tasks scheduler, executed tasks archive, configuration and anomalies control and notification and users management. The information needed to operate and maintain the system must be initially stored at the tool database. SUMO shall automatically schedule the periodical tasks and facilitates the searching and programming of the non-periodical tasks. Tasks planning can be visualized in different formats and dynamically edited to be adjusted to the available resources, anomalies, dates and other constrains that can arise during daily operation. SUMO shall provide warnings to the users notifying potential conflicts related to the required personal availability or the spare stock for the scheduled tasks. To conclude, SUMO has been designed as a tool to help during the operation management of a scientific facility, and in particular an astronomical observatory. This is done by controlling all operating parameters: personal, assets, spare and supply stocks, tasks and time constrains.

  3. The Planning and Scheduling of HST: Improvements and Enhancements since Launch

    NASA Astrophysics Data System (ADS)

    Taylor, D. K.; Chance, D. R.; Jordan, I. J. E.; Patterson, A. P.; Stanley, M.; Taylor, D. C.

    2001-12-01

    The planning and scheduling (P&S) systems used in operating the Hubble Space Telescope (HST) have undergone such substantial and pervasive re-engineering that today they dimly resemble those used when HST was launched. Processes (i.e., software, procedures, networking, etc.) which allow program implementation, the generation of a Long Range Plan (LRP), and the scheduling of science and mission activities have improved drastically in nearly 12 years, resulting in a consistently high observing efficiency, a stable LRP that principal investigators can use, exceptionally clean command loads uplinked to the spacecraft, and the capability of a very fast response time due to onboard anomalies or targets of opportunity. In this presentation we describe many of the systems which comprise the P&S ("front-end") system for HST, how and why they were improved, and what benefits have been realized by either the HST user community or the STScI staff. The systems include the Guide Star System, the Remote Proposal Submission System - 2 (RPS2), Artificial Intelligence (AI) planning tools such as Spike, and the science and mission scheduling software. We also describe how using modern software languages such as Python and better development practices allow STScI staff to do more with HST (e.g., to handle much more science data when ACS is installed) without increasing the cost to HST operations.

  4. Terminal-area STOL operating systems experiments program

    NASA Technical Reports Server (NTRS)

    Smith, D. W.; Watson, D.; Christensen, J. V.

    1972-01-01

    A system study to determine the application of short takeoff aircraft for a high speed, short haul air transportation service was conducted. The study focused on developing information which will aid in choosing system concepts, design criteria, operating procedures, landing guidance systems, air traffic control systems, and airborne avionics and flight control systems. A terminal area STOL operating system experiments program was developed. The objectives, program approach, program schedule, typical experiments, research facilities to be used, and program status are discussed.

  5. Commercial Impact and Optimum Capacity Determination of Pumped Storage Hydro Plant for a Practical Power System

    NASA Astrophysics Data System (ADS)

    Latha, P. G.; Anand, S. R.; Imthias, Ahamed T. P.; Sreejith, P. S., Dr.

    2013-06-01

    This paper attempts to study the commercial impact of pumped storage hydro plant on the operation of a stressed power system. The paper further attempts to compute the optimum capacity of the pumped storage scheme that can be provided on commercial basis for a practical power system. Unlike the analysis of commercial aspects of pumped storage scheme attempted in several papers, this paper is presented from the point of view of power system management of a practical system considering the impact of the scheme on the economic operation of the system. A realistic case study is presented as the many factors that influence the pumped storage operation vary widely from one system to another. The suitability of pumped storage for the particular generation mix of a system is well explored in the paper. To substantiate the economic impact of pumped storage on the system, the problem is formulated as a short-term hydrothermal scheduling problem involving power purchase which optimizes the quantum of power to be scheduled and the duration of operation. The optimization model is formulated using an algebraic modeling language, AMPL, which is then solved using the advanced MILP solver CPLEX.

  6. Identifying Key Issues and Potential Solutions for Integrated Arrival, Departure, Surface Operations by Surveying Stakeholder Preferences

    NASA Technical Reports Server (NTRS)

    Aponso, Bimal; Coppenbarger, Richard A.; Jung, Yoon; Quon, Leighton; Lohr, Gary; O’Connor, Neil; Engelland, Shawn

    2015-01-01

    NASA's Aeronautics Research Mission Directorate (ARMD) collaborates with the FAA and industry to provide concepts and technologies that enhance the transition to the next-generation air-traffic management system (NextGen). To facilitate this collaboration, ARMD has a series of Airspace Technology Demonstration (ATD) sub-projects that develop, demonstrate, and transitions NASA technologies and concepts for implementation in the National Airspace System (NAS). The second of these sub-projects, ATD-2, is focused on the potential benefits to NAS stakeholders of integrated arrival, departure, surface (IADS) operations. To determine the project objectives and assess the benefits of a potential solution, NASA surveyed NAS stakeholders to understand the existing issues in arrival, departure, and surface operations, and the perceived benefits of better integrating these operations. NASA surveyed a broad cross-section of stakeholders representing the airlines, airports, air-navigation service providers, and industry providers of NAS tools. The survey indicated that improving the predictability of flight times (schedules) could improve efficiency in arrival, departure, and surface operations. Stakeholders also mentioned the need for better strategic and tactical information on traffic constraints as well as better information sharing and a coupled collaborative planning process that allows stakeholders to coordinate IADS operations. To assess the impact of a potential solution, NASA sketched an initial departure scheduling concept and assessed its viability by surveying a select group of stakeholders for a second time. The objective of the departure scheduler was to enable flights to move continuously from gate to cruise with minimal interruption in a busy metroplex airspace environment using strategic and tactical scheduling enhanced by collaborative planning between airlines and service providers. The stakeholders agreed that this departure concept could improve schedule predictability and suggested several key attributes that were necessary to make the concept successful. The goals and objectives of the planned ATD-2 sub-project will incorporate the results of this stakeholder feedback.

  7. Planning Systems for Distributed Operations

    NASA Technical Reports Server (NTRS)

    Maxwell, Theresa G.

    2002-01-01

    This viewgraph representation presents an overview of the mission planning process involving distributed operations (such as the International Space Station (ISS)) and the computer hardware and software systems needed to support such an effort. Topics considered include: evolution of distributed planning systems, ISS distributed planning, the Payload Planning System (PPS), future developments in distributed planning systems, Request Oriented Scheduling Engine (ROSE) and Next Generation distributed planning systems.

  8. 77 FR 67319 - Drawbridge Operation Regulation; Lake Champlain, Swanton, VT

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-09

    ... Central Railroad. As a result, in 2012, the operating system was modified by adding electric bridge...: Notice of proposed rulemaking. SUMMARY: The Coast Guard proposes to modify the operating schedule that... owner of the bridge has requested to operate the bridge from a remote location, at St. Albans, Vermont...

  9. Toward a Proof of Concept Cloud Framework for Physics Applications on Blue Gene Supercomputers

    NASA Astrophysics Data System (ADS)

    Dreher, Patrick; Scullin, William; Vouk, Mladen

    2015-09-01

    Traditional high performance supercomputers are capable of delivering large sustained state-of-the-art computational resources to physics applications over extended periods of time using batch processing mode operating environments. However, today there is an increasing demand for more complex workflows that involve large fluctuations in the levels of HPC physics computational requirements during the simulations. Some of the workflow components may also require a richer set of operating system features and schedulers than normally found in a batch oriented HPC environment. This paper reports on progress toward a proof of concept design that implements a cloud framework onto BG/P and BG/Q platforms at the Argonne Leadership Computing Facility. The BG/P implementation utilizes the Kittyhawk utility and the BG/Q platform uses an experimental heterogeneous FusedOS operating system environment. Both platforms use the Virtual Computing Laboratory as the cloud computing system embedded within the supercomputer. This proof of concept design allows a cloud to be configured so that it can capitalize on the specialized infrastructure capabilities of a supercomputer and the flexible cloud configurations without resorting to virtualization. Initial testing of the proof of concept system is done using the lattice QCD MILC code. These types of user reconfigurable environments have the potential to deliver experimental schedulers and operating systems within a working HPC environment for physics computations that may be different from the native OS and schedulers on production HPC supercomputers.

  10. Spike: Artificial intelligence scheduling for Hubble space telescope

    NASA Technical Reports Server (NTRS)

    Johnston, Mark; Miller, Glenn; Sponsler, Jeff; Vick, Shon; Jackson, Robert

    1990-01-01

    Efficient utilization of spacecraft resources is essential, but the accompanying scheduling problems are often computationally intractable and are difficult to approximate because of the presence of numerous interacting constraints. Artificial intelligence techniques were applied to the scheduling of the NASA/ESA Hubble Space Telescope (HST). This presents a particularly challenging problem since a yearlong observing program can contain some tens of thousands of exposures which are subject to a large number of scientific, operational, spacecraft, and environmental constraints. New techniques were developed for machine reasoning about scheduling constraints and goals, especially in cases where uncertainty is an important scheduling consideration and where resolving conflicts among conflicting preferences is essential. These technique were utilized in a set of workstation based scheduling tools (Spike) for HST. Graphical displays of activities, constraints, and schedules are an important feature of the system. High level scheduling strategies using both rule based and neural network approaches were developed. While the specific constraints implemented are those most relevant to HST, the framework developed is far more general and could easily handle other kinds of scheduling problems. The concept and implementation of the Spike system are described along with some experiments in adapting Spike to other spacecraft scheduling domains.

  11. Automatic Scheduling and Planning (ASAP) in future ground control systems

    NASA Technical Reports Server (NTRS)

    Matlin, Sam

    1988-01-01

    This report describes two complementary approaches to the problem of space mission planning and scheduling. The first is an Expert System or Knowledge-Based System for automatically resolving most of the activity conflicts in a candidate plan. The second is an Interactive Graphics Decision Aid to assist the operator in manually resolving the residual conflicts which are beyond the scope of the Expert System. The two system designs are consistent with future ground control station activity requirements, support activity timing constraints, resource limits and activity priority guidelines.

  12. The ATA-67 Formula for Direct Operating Cost

    NASA Technical Reports Server (NTRS)

    Faulkner, H. B.

    1972-01-01

    The ATA formulas for direct operating cost were developed for the purpose of comparing different aircraft, existing or not, on the same route or the same aircraft on different routes. Such characteristics of the airline as crew pay, maintenance procedures, and depreciation schedules are kept constant. In air transportation systems analysis the 1967 ATA formula is usually used with appropriate exceptions or modifications, such as: different maintenance labor rate, total maintenance multiplied by a factor, maintenance burden deleted, different depreciation schedule, or different spares percentages.

  13. Evaluation of High Density Air Traffic Operations with Automation for Separation Assurance, Weather Avoidance and Schedule Conformance

    NASA Technical Reports Server (NTRS)

    Prevot, Thomas; Mercer, Joey S.; Martin, Lynne Hazel; Homola, Jeffrey R.; Cabrall, Christopher D.; Brasil, Connie L.

    2011-01-01

    In this paper we discuss the development and evaluation of our prototype technologies and procedures for far-term air traffic control operations with automation for separation assurance, weather avoidance and schedule conformance. Controller-in-the-loop simulations in the Airspace Operations Laboratory at the NASA Ames Research Center in 2010 have shown very promising results. We found the operations to provide high airspace throughput, excellent efficiency and schedule conformance. The simulation also highlighted areas for improvements: Short-term conflict situations sometimes resulted in separation violations, particularly for transitioning aircraft in complex traffic flows. The combination of heavy metering and growing weather resulted in an increased number of aircraft penetrating convective weather cells. To address these shortcomings technologies and procedures have been improved and the operations are being re-evaluated with the same scenarios. In this paper we will first describe the concept and technologies for automating separation assurance, weather avoidance, and schedule conformance. Second, the results from the 2010 simulation will be reviewed. We report human-systems integration aspects, safety and efficiency results as well as airspace throughput, workload, and operational acceptability. Next, improvements will be discussed that were made to address identified shortcomings. We conclude that, with further refinements, air traffic control operations with ground-based automated separation assurance can routinely provide currently unachievable levels of traffic throughput in the en route airspace.

  14. An Online Scheduling Algorithm with Advance Reservation for Large-Scale Data Transfers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Balman, Mehmet; Kosar, Tevfik

    Scientific applications and experimental facilities generate massive data sets that need to be transferred to remote collaborating sites for sharing, processing, and long term storage. In order to support increasingly data-intensive science, next generation research networks have been deployed to provide high-speed on-demand data access between collaborating institutions. In this paper, we present a practical model for online data scheduling in which data movement operations are scheduled in advance for end-to-end high performance transfers. In our model, data scheduler interacts with reservation managers and data transfer nodes in order to reserve available bandwidth to guarantee completion of jobs that aremore » accepted and confirmed to satisfy preferred time constraint given by the user. Our methodology improves current systems by allowing researchers and higher level meta-schedulers to use data placement as a service where theycan plan ahead and reserve the scheduler time in advance for their data movement operations. We have implemented our algorithm and examined possible techniques for incorporation into current reservation frameworks. Performance measurements confirm that the proposed algorithm is efficient and scalable.« less

  15. Battery Energy Storage State-of-Charge Forecasting: Models, Optimization, and Accuracy

    DOE PAGES

    Rosewater, David; Ferreira, Summer; Schoenwald, David; ...

    2018-01-25

    Battery energy storage systems (BESS) are a critical technology for integrating high penetration renewable power on an intelligent electrical grid. As limited energy restricts the steady-state operational state-of-charge (SoC) of storage systems, SoC forecasting models are used to determine feasible charge and discharge schedules that supply grid services. Smart grid controllers use SoC forecasts to optimize BESS schedules to make grid operation more efficient and resilient. This study presents three advances in BESS state-of-charge forecasting. First, two forecasting models are reformulated to be conducive to parameter optimization. Second, a new method for selecting optimal parameter values based on operational datamore » is presented. Last, a new framework for quantifying model accuracy is developed that enables a comparison between models, systems, and parameter selection methods. The accuracies achieved by both models, on two example battery systems, with each method of parameter selection are then compared in detail. The results of this analysis suggest variation in the suitability of these models for different battery types and applications. Finally, the proposed model formulations, optimization methods, and accuracy assessment framework can be used to improve the accuracy of SoC forecasts enabling better control over BESS charge/discharge schedules.« less

  16. Battery Energy Storage State-of-Charge Forecasting: Models, Optimization, and Accuracy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rosewater, David; Ferreira, Summer; Schoenwald, David

    Battery energy storage systems (BESS) are a critical technology for integrating high penetration renewable power on an intelligent electrical grid. As limited energy restricts the steady-state operational state-of-charge (SoC) of storage systems, SoC forecasting models are used to determine feasible charge and discharge schedules that supply grid services. Smart grid controllers use SoC forecasts to optimize BESS schedules to make grid operation more efficient and resilient. This study presents three advances in BESS state-of-charge forecasting. First, two forecasting models are reformulated to be conducive to parameter optimization. Second, a new method for selecting optimal parameter values based on operational datamore » is presented. Last, a new framework for quantifying model accuracy is developed that enables a comparison between models, systems, and parameter selection methods. The accuracies achieved by both models, on two example battery systems, with each method of parameter selection are then compared in detail. The results of this analysis suggest variation in the suitability of these models for different battery types and applications. Finally, the proposed model formulations, optimization methods, and accuracy assessment framework can be used to improve the accuracy of SoC forecasts enabling better control over BESS charge/discharge schedules.« less

  17. Real-time scheduling faces operational challenges.

    PubMed

    2005-01-01

    Online real-time patient scheduling presents a number of challenges. But a few advanced organizations are rolling out systems slowly, meeting those challenges as they go. And while this application is still too new to provide measurable benefits, anecdotal information seems to point to improvements in efficiency, patient satisfaction, and possibly quality of care.

  18. A Comparison of Declarative and Hybrid Declarative-Procedural Models for Rover Operations

    NASA Technical Reports Server (NTRS)

    Knight, Russell; Rabideau, Gregg; Lenda, Matthew; Maldague, Pierre

    2012-01-01

    The MAPGEN [2] (Mixed-initiative Activity Plan GENerator) planning system is a great example of a hybrid procedural/declarative system where the advantages of each are leveraged to produce an effective planner/scheduler for Mars Exploration Rover tactical planning. We explore the adaptation of the same domain to an entirely declarative planning system (ASPEN [4] Activity Scheduling and Planning ENvironment), and demonstrate that, with some translation, much of the procedural knowledge encoding is amenable to a declarative knowledge encoding.

  19. 14 CFR 298.62 - Reporting of financial data.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... PROCEEDINGS) ECONOMIC REGULATIONS EXEMPTIONS FOR AIR TAXI AND COMMUTER AIR CARRIER OPERATIONS Reporting... used to report financial data for the overall or system operations of the carrier. At the option of the... services. This category shall include revenue derived from scheduled service operations, revenue derived...

  20. Prediction Based Proactive Thermal Virtual Machine Scheduling in Green Clouds

    PubMed Central

    Kinger, Supriya; Kumar, Rajesh; Sharma, Anju

    2014-01-01

    Cloud computing has rapidly emerged as a widely accepted computing paradigm, but the research on Cloud computing is still at an early stage. Cloud computing provides many advanced features but it still has some shortcomings such as relatively high operating cost and environmental hazards like increasing carbon footprints. These hazards can be reduced up to some extent by efficient scheduling of Cloud resources. Working temperature on which a machine is currently running can be taken as a criterion for Virtual Machine (VM) scheduling. This paper proposes a new proactive technique that considers current and maximum threshold temperature of Server Machines (SMs) before making scheduling decisions with the help of a temperature predictor, so that maximum temperature is never reached. Different workload scenarios have been taken into consideration. The results obtained show that the proposed system is better than existing systems of VM scheduling, which does not consider current temperature of nodes before making scheduling decisions. Thus, a reduction in need of cooling systems for a Cloud environment has been obtained and validated. PMID:24737962

  1. Automated power management and control

    NASA Technical Reports Server (NTRS)

    Dolce, James L.

    1991-01-01

    A comprehensive automation design is being developed for Space Station Freedom's electric power system. A joint effort between NASA's Office of Aeronautics and Exploration Technology and NASA's Office of Space Station Freedom, it strives to increase station productivity by applying expert systems and conventional algorithms to automate power system operation. The initial station operation will use ground-based dispatches to perform the necessary command and control tasks. These tasks constitute planning and decision-making activities that strive to eliminate unplanned outages. We perceive an opportunity to help these dispatchers make fast and consistent on-line decisions by automating three key tasks: failure detection and diagnosis, resource scheduling, and security analysis. Expert systems will be used for the diagnostics and for the security analysis; conventional algorithms will be used for the resource scheduling.

  2. Analysis of electric power industry restructuring

    NASA Astrophysics Data System (ADS)

    Al-Agtash, Salem Yahya

    1998-10-01

    This thesis evaluates alternative structures of the electric power industry in a competitive environment. One structure is based on the principle of creating a mandatory power pool to foster competition and manage system economics. The structure is PoolCo (pool coordination). A second structure is based on the principle of allowing independent multilateral trading and decentralized market coordination. The structure is DecCo (decentralized coordination). The criteria I use to evaluate these two structures are: economic efficiency, system reliability and freedom of choice. Economic efficiency evaluation considers strategic behavior of individual generators as well as behavioral variations of different classes of consumers. A supply-function equilibria model is characterized for deriving bidding strategies of competing generators under PoolCo. It is shown that asymmetric equilibria can exist within the capacities of generators. An augmented Lagrangian approach is introduced to solve iteratively for global optimal operations schedules. Under DecCo, the process involves solving iteratively for system operations schedules. The schedules reflect generators strategic behavior and brokers' interactions for arranging profitable trades, allocating losses and managing network congestion. In the determination of PoolCo and DecCo operations schedules, overall costs of power generation (start-up and shut-down costs and availability of hydro electric power) as well as losses and costs of transmission network are considered. For system reliability evaluation, I examine the effect of PoolCo and DecCo operating conditions on the system security. Random component failure perturbations are generated to simulate the actual system behavior. This is done using Monte Carlo simulation. Freedom of choice evaluation accounts for schemes' beneficial opportunities and capabilities to respond to consumers expressed preferences. An IEEE 24-bus test system is used to illustrate the concepts developed for economic efficiency evaluation. The system was tested over two years time period. The results indicate 2.6684 and 2.7269 percent of efficiency loss on average for PoolCo and DecCo, respectively. These values, however, do not represent forecasts of efficiency losses of PoolCo- and DecCo-based competitive industries. Rather, they are illustrations of the efficiency losses for the given IEEE test system and based on the modeling assumptions underlying framework development.

  3. Cost/benefit tradeoffs for reducing the energy consumption of the commercial air transportation system

    NASA Technical Reports Server (NTRS)

    Kraus, E. F.; Vanabkoude, J. C.

    1976-01-01

    The fuel saving potential and cost effectiveness of numerous operational and technical options proposed for reducing the fuel consumption of the U.S. commercial airline fleet was examined and compared. The impact of the most promising fuel conserving options on fuel consumption, passenger demand, operating costs and airline profits when implemented in the U.S. domestic and international airline fleets was determined. A forecast estimate was made of the potential fuel savings achievable in the U.S. scheduled air transportation system. Specifically, the means for reducing the jet fuel consumption of the U.S. scheduled airlines in domestic and international passenger operations were investigated. A design analysis was made of two turboprop aircraft as possible fuel conserving derivatives of the DC-9-30.

  4. KSC-2013-2918

    NASA Image and Video Library

    2013-06-27

    CAPE CANAVERAL, Fla. – Inside the Operations and Checkout Building high bay at NASA’s Kennedy Space Center in Florida, members of the media receive an on activities in NASA’s Ground Systems Development and Operations, or GSDO, Program, Space Launch System and Orion crew module for Exploration Test Flight 1. Speaking to the media is Scott Wilson, manager of Orion Production Operations at Kennedy. Orion is the exploration spacecraft designed to carry crews to space beyond low Earth orbit. It will provide emergency abort capability, sustain the crew during the space travel and provide safe re-entry from deep space return velocities. Orion’s first unpiloted test flight is scheduled to launch in 2014 atop a Delta IV rocket. A second uncrewed flight test is scheduled for 2017 on NASA’s Space Launch System rocket. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Jim Grossmann

  5. KSC-2013-2923

    NASA Image and Video Library

    2013-06-27

    CAPE CANAVERAL, Fla. – Inside the Operations and Checkout Building high bay at NASA’s Kennedy Space Center in Florida, members of the media receive an on activities in NASA’s Ground Systems Development and Operations, or GSDO, Program, Space Launch System and Orion crew module for Exploration Test Flight 1. Speaking to the media is Jeremy Parsons, chief of the GSDO Operations Integration Office at Kennedy. Orion is the exploration spacecraft designed to carry crews to space beyond low Earth orbit. It will provide emergency abort capability, sustain the crew during the space travel and provide safe re-entry from deep space return velocities. Orion’s first unpiloted test flight is scheduled to launch in 2014 atop a Delta IV rocket. A second uncrewed flight test is scheduled for 2017 on NASA’s Space Launch System rocket. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Jim Grossmann

  6. KSC-2013-2922

    NASA Image and Video Library

    2013-06-27

    CAPE CANAVERAL, Fla. – Inside the Operations and Checkout Building high bay at NASA’s Kennedy Space Center in Florida, members of the media receive an on activities in NASA’s Ground Systems Development and Operations, or GSDO, Program, Space Launch System and Orion crew module for Exploration Test Flight 1. Speaking to the media is Jeremy Parsons, chief of the GSDO Operations Integration Office at Kennedy. Orion is the exploration spacecraft designed to carry crews to space beyond low Earth orbit. It will provide emergency abort capability, sustain the crew during the space travel and provide safe re-entry from deep space return velocities. Orion’s first unpiloted test flight is scheduled to launch in 2014 atop a Delta IV rocket. A second uncrewed flight test is scheduled for 2017 on NASA’s Space Launch System rocket. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Jim Grossmann

  7. Range Process Simulation Tool

    NASA Technical Reports Server (NTRS)

    Phillips, Dave; Haas, William; Barth, Tim; Benjamin, Perakath; Graul, Michael; Bagatourova, Olga

    2005-01-01

    Range Process Simulation Tool (RPST) is a computer program that assists managers in rapidly predicting and quantitatively assessing the operational effects of proposed technological additions to, and/or upgrades of, complex facilities and engineering systems such as the Eastern Test Range. Originally designed for application to space transportation systems, RPST is also suitable for assessing effects of proposed changes in industrial facilities and large organizations. RPST follows a model-based approach that includes finite-capacity schedule analysis and discrete-event process simulation. A component-based, scalable, open architecture makes RPST easily and rapidly tailorable for diverse applications. Specific RPST functions include: (1) definition of analysis objectives and performance metrics; (2) selection of process templates from a processtemplate library; (3) configuration of process models for detailed simulation and schedule analysis; (4) design of operations- analysis experiments; (5) schedule and simulation-based process analysis; and (6) optimization of performance by use of genetic algorithms and simulated annealing. The main benefits afforded by RPST are provision of information that can be used to reduce costs of operation and maintenance, and the capability for affordable, accurate, and reliable prediction and exploration of the consequences of many alternative proposed decisions.

  8. IUS/TUG orbital operations and mission support study. Volume 4: Project planning data

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Planning data are presented for the development phases of interim upper stage (IUS) and tug systems. Major project planning requirements, major event schedules, milestones, system development and operations process networks, and relevant support research and technology requirements are included. Topics discussed include: IUS flight software; tug flight software; IUS/tug ground control center facilities, personnel, data systems, software, and equipment; IUS mission events; tug mission events; tug/spacecraft rendezvous and docking; tug/orbiter operations interface, and IUS/orbiter operations interface.

  9. An AI approach for scheduling space-station payloads at Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Castillo, D.; Ihrie, D.; Mcdaniel, M.; Tilley, R.

    1987-01-01

    The Payload Processing for Space-Station Operations (PHITS) is a prototype modeling tool capable of addressing many Space Station related concerns. The system's object oriented design approach coupled with a powerful user interface provide the user with capabilities to easily define and model many applications. PHITS differs from many artificial intelligence based systems in that it couples scheduling and goal-directed simulation to ensure that on-orbit requirement dates are satisfied.

  10. The SAX Italian scientific satellite. The on-board implemented automation as a support to the ground control capability

    NASA Technical Reports Server (NTRS)

    Martelli, Andrea

    1994-01-01

    This paper presents the capabilities implemented in the SAX system for an efficient operations management during its in-flight mission. SAX is an Italian scientific satellite for x-ray astronomy whose major mission objectives impose quite tight constraints on the implementation of both the space and ground segment. The most relevant mission characteristics require an operative lifetime of two years, performing scientific observations both in contact and in noncontact periods, with a low equatorial orbit supported by one ground station, so that only a few minutes of communications are available each orbit. This operational scenario determines the need to have a satellite capable of performing the scheduled mission automatically and reacting autonomously to contingency situations. The implementation approach of the on-board operations management, through which the necessary automation and autonomy are achieved, follows a hierarchical structure. This has been achieved adopting a distributed avionic architecture. Nine different on-board computers, in fact, constitute the on-board data management system. Each of them performs the local control and monitors its own functions while the system level control is performed at a higher level by the data handling applications software. The SAX on-board architecture provides the ground operators with different options of intervention by three classes of telecommands. The management of the scientific operations will be scheduled by the operation control center via dedicated operating plans. The SAX satellite flight mode is presently being integrated at Alenia Spazio premises in Turin for a launch scheduled for the end of 1995. Once in orbit, the SAX satellite will be subject to intensive check-out activities in order to verify the required mission performances. An overview of the envisaged procedure and of the necessary on-ground activities is therefore depicted as well.

  11. Precision Departure Release Capability (PDRC) Concept of Operations

    NASA Technical Reports Server (NTRS)

    Engelland, Shawn; Capps, Richard A.; Day, Kevin Brian

    2013-01-01

    After takeoff, aircraft must merge into en route (Center) airspace traffic flows which may be subject to constraints that create localized demandcapacity imbalances. When demand exceeds capacity Traffic Management Coordinators (TMCs) often use tactical departure scheduling to manage the flow of departures into the constrained Center traffic flow. Tactical departure scheduling usually involves use of a Call for Release (CFR) procedure wherein the Tower must call the Center TMC to coordinate a release time prior to allowing the flight to depart. In present-day operations release times are computed by the Center Traffic Management Advisor (TMA) decision support tool based upon manual estimates of aircraft ready time verbally communicated from the Tower to the Center. The TMA-computed release is verbally communicated from the Center back to the Tower where it is relayed to the Local controller as a release window that is typically three minutes wide. The Local controller will manage the departure to meet the coordinated release time window. Manual ready time prediction and verbal release time coordination are labor intensive and prone to inaccuracy. Also, use of release time windows adds uncertainty to the tactical departure process. Analysis of more than one million flights from January 2011 indicates that a significant number of tactically scheduled aircraft missed their en route slot due to ready time prediction uncertainty. Uncertainty in ready time estimates may result in missed opportunities to merge into constrained en route flows and lead to lost throughput. Next Generation Air Transportation System (NextGen) plans call for development of Tower automation systems capable of computing surface trajectory-based ready time estimates. NASA has developed the Precision Departure Release Capability (PDRC) concept that uses this technology to improve tactical departure scheduling by automatically communicating surface trajectory-based ready time predictions to the Center scheduling tool. The PDRC concept also incorporates earlier NASA and FAA research into automation-assisted CFR coordination. The PDRC concept helps reduce uncertainty by automatically communicating coordinated release times with seconds-level precision enabling TMCs to work with target times rather than windows. NASA has developed a PDRC prototype system that integrates the Center's TMA system with a research prototype Tower decision support tool. A two-phase field evaluation was conducted at NASA's North Texas Research Station (NTX) in DallasFort Worth. The field evaluation validated the PDRC concept and demonstrated reduced release time uncertainty while being used for tactical departure scheduling of more than 230 operational flights over 29 weeks of operations. This paper presents the Concept of Operations. Companion papers include the Final Report and a Technology Description. ? SUBJECT:

  12. Planning as a Precursor to Scheduling for Space Station Payload Operations

    NASA Technical Reports Server (NTRS)

    Howell, Eric; Maxwell, Theresa

    1995-01-01

    Contemporary schedulers attempt to solve the problem of best fitting a set of activities into an available timeframe while still satisfying the necessary constraints. This approach produces results which are optimized for the region of time the scheduler is able to process, satisfying the near term goals of the operation. In general the scheduler is not able to reason about the activities which precede or follow the window into which it is inputs to scheduling so that the intermediate placing activities. This creates a problem for operations which are composed of many activities spanning long durations (which exceed the scheduler's reasoning horizon) such as the continuous operations environment for payload operations on the Space Station. Not only must the near term scheduling objectives be met, but somehow the results of near term scheduling must be made to support the attainment of long term goals.

  13. 78 FR 11747 - Drawbridge Operation Regulations; Chelsea River, Chelsea and East Boston, MA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-20

    ... skew and must be adjusted to prevent damage to the operating system. The adjustment maintenance... with 33 CFR 117.35(e), the bridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33...

  14. ESTRACK Support for CCSDS Space Communication Cross Support Service Management

    NASA Astrophysics Data System (ADS)

    Dreihahn, H.; Unal, M.; Hoffmann, A.

    2011-08-01

    The CCSDS Recommended Standard for Space Communication Cross Support Service Management (SCCS SM) published as Blue Book in August 2009 is intended to provide standardised interfaces to negotiate, schedule, and manage the support of space missions by ground station network operators. ESA as a member of CCSDS has actively supported the development of the SCCS SM standard and is obviously interested in adopting it. Support of SCCS SM conforming interfaces and procedures includes:• Provision of SCCS SM conforming interfaces to non ESA missions;• Use of SCCS SM interfaces provided by other ground station operators to manage cross support of ESA missions;• In longer terms potentially use of SCCS SM interfaces and procedures also internally for support of ESA missions by ESTRACK.In the recent years ESOC has automated management and scheduling of ESA Tracking Network (ESTRACK) services by the specification, development, and deployment of the ESTRACK Management System (EMS), more specifically its planning and scheduling components ESTRACK Planning System and ESTRACK Scheduling System. While full support of the SCCS SM standard will involve also other elements of the ground segment operated by ESOC such as the Flight Dynamic System, EMS is at the core of service management and it is therefore appropriate to initially focus on the question to what extent EMS can support SCCS SM. This paper presents results of the initial analysis phase. After briefly presenting the SCCS SM standard and the relevant components of the ESTRACK management system, we will discuss the initial deployment options, open issues and a tentative roadmap for the way to proceed. Obviously the adoption of a cross support standard requires and discussion and coordination of the involved parties and agencies, especially in the light of the fact that the SCCS SM standard has many optional parts.

  15. Operations mission planner beyond the baseline

    NASA Technical Reports Server (NTRS)

    Biefeld, Eric; Cooper, Lynne

    1991-01-01

    The scheduling of Space Station Freedom must satisfy four major requirements. It must ensure efficient housekeeping operations, maximize the collection of science, respond to changes in tasking and available resources, and accommodate the above changes in a manner that minimizes disruption of the ongoing operations of the station. While meeting these requirements the scheduler must cope with the complexity, scope, and flexibility of SSF operations. This requires the scheduler to deal with an astronomical number of possible schedules. The Operations Mission Planner (OMP) is centered around minimally disruptive replanning and the use of heuristics limit search in scheduling. OMP has already shown several artificial intelligence based scheduling techniques such as Interleaved Iterative Refinement and Bottleneck Identification using Process Chronologies.

  16. An Optimizing Space Data-Communications Scheduling Method and Algorithm with Interference Mitigation, Generalized for a Broad Class of Optimization Problems

    NASA Technical Reports Server (NTRS)

    Rash, James

    2014-01-01

    NASA's space data-communications infrastructure-the Space Network and the Ground Network-provide scheduled (as well as some limited types of unscheduled) data-communications services to user spacecraft. The Space Network operates several orbiting geostationary platforms (the Tracking and Data Relay Satellite System (TDRSS)), each with its own servicedelivery antennas onboard. The Ground Network operates service-delivery antennas at ground stations located around the world. Together, these networks enable data transfer between user spacecraft and their mission control centers on Earth. Scheduling data-communications events for spacecraft that use the NASA communications infrastructure-the relay satellites and the ground stations-can be accomplished today with software having an operational heritage dating from the 1980s or earlier. An implementation of the scheduling methods and algorithms disclosed and formally specified herein will produce globally optimized schedules with not only optimized service delivery by the space data-communications infrastructure but also optimized satisfaction of all user requirements and prescribed constraints, including radio frequency interference (RFI) constraints. Evolutionary algorithms, a class of probabilistic strategies for searching large solution spaces, is the essential technology invoked and exploited in this disclosure. Also disclosed are secondary methods and algorithms for optimizing the execution efficiency of the schedule-generation algorithms themselves. The scheduling methods and algorithms as presented are adaptable to accommodate the complexity of scheduling the civilian and/or military data-communications infrastructure within the expected range of future users and space- or ground-based service-delivery assets. Finally, the problem itself, and the methods and algorithms, are generalized and specified formally. The generalized methods and algorithms are applicable to a very broad class of combinatorial-optimization problems that encompasses, among many others, the problem of generating optimal space-data communications schedules.

  17. KSC-2013-2917

    NASA Image and Video Library

    2013-06-27

    CAPE CANAVERAL, Fla. – Inside the Operations and Checkout Building high bay at NASA’s Kennedy Space Center in Florida, members of the media receive an on activities in NASA’s Ground Systems Development and Operations, or GSDO, Program, Space Launch System and Orion crew module for Exploration Test Flight 1. Speaking to the media, from left are Scott Wilson, manager of Orion Production Operations at Kennedy Larry Price, Lockheed Martin deputy program manager for Orion Tom Erdman, from Marshall Space Flight Center’s Kennedy resident office Jules Schneider, Lockheed Martin manager of Orion Production Operations and Jeremy Parsons, chief of the GSDO Operations Integration Office at Kennedy. Orion is the exploration spacecraft designed to carry crews to space beyond low Earth orbit. It will provide emergency abort capability, sustain the crew during the space travel and provide safe re-entry from deep space return velocities. Orion’s first unpiloted test flight is scheduled to launch in 2014 atop a Delta IV rocket. A second uncrewed flight test is scheduled for 2017 on NASA’s Space Launch System rocket. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Jim Grossmann

  18. Space Operations Center system analysis study extension. Volume 2: Programmatics and cost

    NASA Technical Reports Server (NTRS)

    1982-01-01

    A summary of Space Operations Center (SOC) orbital space station costs, program options and program recommendations is presented. Program structure, hardware commonality, schedules and program phasing are considered. Program options are analyzed with respect to mission needs, design and technology options, and anticipated funding constraints. Design and system options are discussed.

  19. Engineering Elegant Systems: Postulates, Principles, and Hypotheses of Systems Engineering

    NASA Technical Reports Server (NTRS)

    Watson, Michael D.

    2018-01-01

    Definition: System Engineering is the engineering discipline which integrates the system functions, system environment, and the engineering disciplines necessary to produce and/or operate an elegant system; Elegant System - A system that is robust in application, fully meeting specified and adumbrated intent, is well structured, and is graceful in operation. Primary Focus: System Design and Integration: Identify system couplings and interactions; Identify system uncertainties and sensitivities; Identify emergent properties; Manage the effectiveness of the system. Engineering Discipline Integration: Manage flow of information for system development and/or operations; Maintain system activities within budget and schedule. Supporting Activities: Process application and execution.

  20. Time-based air traffic management using expert systems

    NASA Technical Reports Server (NTRS)

    Tobias, L.; Scoggins, J. L.

    1986-01-01

    A prototype expert system has been developed for the time scheduling of aircraft into the terminal area. The three functions of the air-traffic-control schedule advisor are as follows: (1) for each new arrival, it develops an admisible flight plan for that aircraft; (2) as the aircraft progresses through the terminal area, it monitors deviations from the aircraft's flight plan and provides advisories to return the aircraft to its assigned schedule; and (3) if major disruptions such as missed approaches occur, it develops a revised plan. The advisor is operational on a Symbolics 3600, and is programmed in MRS (a logic programming language), Lisp, and Fortran.

  1. Time-based air traffic management using expert systems

    NASA Technical Reports Server (NTRS)

    Tobias, L.; Scoggins, J. L.

    1986-01-01

    A prototype expert system was developed for the time scheduling of aircraft into the terminal area. The three functions of the air traffic control schedule advisor are as follows: first, for each new arrival, it develops an admissible flight plan for that aircraft. Second, as the aircraft progresses through the terminal area, it monitors deviations from the flight plan and provides advisories to return the aircraft to its assigned schedule. Third, if major disruptions such as missed approaches occur, it develops a revised plan. The advisor is operational on a Symbolics 3600, and is programed in MRS (a logic programming language), Lisp, and FORTRAN.

  2. Highly Automated Arrival Management and Control System Suitable for Early NextGen

    NASA Technical Reports Server (NTRS)

    Swenson, Harry N.; Jung, Jaewoo

    2013-01-01

    This is a presentation of previously published work conducted in the development of the Terminal Area Precision Scheduling and Spacing (TAPSS) system. Included are concept and technical descriptions of the TAPSS system and results from human in the loop simulations conducted at Ames Research Center. The Terminal Area Precision Scheduling and Spacing system has demonstrated through research and extensive high-fidelity simulation studies to have benefits in airport arrival throughput, supporting efficient arrival descents, and enabling mixed aircraft navigation capability operations during periods of high congestion. NASA is currently porting the TAPSS system into the FAA TBFM and STARS system prototypes to ensure its ability to operate in the FAA automation Infrastructure. NASA ATM Demonstration Project is using the the TAPSS technologies to provide the ground-based automation tools to enable airborne Interval Management (IM) capabilities. NASA and the FAA have initiated a Research Transition Team to enable potential TAPSS and IM Technology Transfer.

  3. Predicting Schedule Duration for Defense Acquisition Programs: Program Initiation to Initial Operational Capability

    DTIC Science & Technology

    2016-03-24

    Corporation found that increases in schedule effort tend to be the reason for increases in the cost of acquiring a new weapons system due to, at a minimum...in-depth finance and schedule data for selected programs (Brown et al., 2015). We also give extra focus on Research Development Test & Evaluation...we create and employ an entirely new database. The database we utilize for our research is a database originally built by the RAND Corporation for

  4. A Study of Strategic Lessons Learned in Vietnam. Volume 6. Conduct of the War. Book 2. Functional Analyses

    DTIC Science & Technology

    1980-05-02

    for rebuild. "* The rapid buildup in RVN without mobilizing the Reserve Component made it necessary to draw on materiel and equipment in or scheduled ...been restored to service by 1957. By 1960 the system within RVN was operating both scheduled freight and passenger trains on mucii)of the line...established under a concept approved in April 1963 to provide a centralized source of logistic data for the Pacific Theater. It was scheduled to be

  5. Joint operations planning for space surveillance missions on the MSX satellite

    NASA Technical Reports Server (NTRS)

    Stokes, Grant; Good, Andrew

    1994-01-01

    The Midcourse Space Experiment (MSX) satellite, sponsored by BMDO, is intended to gather broad-band phenomenology data on missiles, plumes, naturally occurring earthlimb backgrounds and deep space backgrounds. In addition the MSX will be used to conduct functional demonstrations of space-based space surveillance. The JHU/Applied Physics Laboratory (APL), located in Laurel, MD, is the integrator and operator of the MSX satellite. APL will conduct all operations related to the MSX and is charged with the detailed operations planning required to implement all of the experiments run on the MSX except the space surveillance experiments. The non-surveillance operations are generally amenable to being defined months ahead of time and being scheduled on a monthly basis. Lincoln Laboratory, Massachusetts Institute of Technology (LL), located in Lexington, MA, is the provider of one of the principle MSX instruments, the Space-Based Visible (SBV) sensor, and the agency charged with implementing the space surveillance demonstrations on the MSX. The planning timelines for the space surveillance demonstrations are fundamentally different from those for the other experiments. They are generally amenable to being scheduled on a monthly basis, but the specific experiment sequence and pointing must be refined shortly before execution. This allocation of responsibilities to different organizations implies the need for a joint mission planning system for conducting space surveillance demonstrations. This paper details the iterative, joint planning system, based on passing responsibility for generating MSX commands for surveillance operations from APL to LL for specific scheduled operations. The joint planning system, including the generation of a budget for spacecraft resources to be used for surveillance events, has been successfully demonstrated during ground testing of the MSX and is being validated for MSX launch within the year. The planning system developed for the MSX forms a model possibly applicable to developing distributed mission planning systems for other multi-use satellites.

  6. Managing Contention and Timing Constraints in a Real-Time Database System

    DTIC Science & Technology

    1995-01-01

    In order to realize many of these goals, StarBase is constructed on top of RT-Mach, a real - time operating system developed at Carnegie Mellon...University [ll]. StarBase differs from previous RT-DBMS work [l, 2, 31 in that a) it relies on a real - time operating system which provides priority...CPU and resource scheduling pro- vided by tlhe underlying real - time operating system . Issues of data contention are dealt with by use of a priority

  7. Feasibility Criteria for Interval Management Operations as Part of Arrival Management Operations

    NASA Technical Reports Server (NTRS)

    Levitt, Ian M.; Weitz, Lesley A.; Barmore, Bryan E.; Castle, Michael W.

    2014-01-01

    Interval Management (IM) is a future airborne spacing concept that aims to provide more precise inter-aircraft spacing to yield throughput improvements and greater use of fuel efficient trajectories for arrival and approach operations. To participate in an IM operation, an aircraft must be equipped with avionics that provide speeds to achieve and maintain an assigned spacing interval relative to another aircraft. It is not expected that all aircraft will be equipped with the necessary avionics, but rather that IM fits into a larger arrival management concept developed to support the broader mixed-equipage environment. Arrival management concepts are comprised of three parts: a ground-based sequencing and scheduling function to develop an overall arrival strategy, ground-based tools to support the management of aircraft to that schedule, and the IM tools necessary for the IM operation (i.e., ground-based set-up, initiation, and monitoring, and the flight-deck tools to conduct the IM operation). The Federal Aviation Administration is deploying a near-term ground-automation system to support metering operations in the National Airspace System, which falls within the first two components of the arrival management concept. This paper develops a methodology for determining the required delivery precision at controlled meter points for aircraft that are being managed to a schedule and aircraft being managed to a relative spacing interval in order to achieve desired flow rates and adequate separation at the meter points.

  8. Task Decomposition Model for Dispatchers in Dynamic Scheduling of Demand Responsive Transit Systems

    DOT National Transportation Integrated Search

    2000-06-01

    Since the passage of ADA, the demand for paratransit service is steadily increasing. Paratransit companies are relying on computer automation to streamline dispatch operations, increase productivity and reduce operator stress and error. Little resear...

  9. Data analysis for bus planning and monitoring

    DOT National Transportation Integrated Search

    2000-01-01

    This synthesis report will be of interest to transit agency managers, their schedule and operations planning staffs and others that are responsible for information about systems operations and ridership. It will also be of interest to others who inte...

  10. 29 CFR 1952.361 - Developmental schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... provided by the plan: (a) Development of a complete and operating management information and control system... achieve operational status by December 1, 1976. (e) Amendments to basic legislation to become effective by July 1, 1977. (f) Public employee program to become operational by July 1, 1977. [40 FR 57456, Dec. 10...

  11. Utilizing Novel Non-traditional Sensor Tasking Approaches to Enhance the Space Situational Awareness Picture Maintained by the Space Surveillance Network

    NASA Astrophysics Data System (ADS)

    Herz, A.; Herz, E.; Center, K.; George, P.; Axelrad, P.; Mutschler, S.; Jones, B.

    2016-09-01

    The Space Surveillance Network (SSN) is tasked with the increasingly difficult mission of detecting, tracking, cataloging and identifying artificial objects orbiting the Earth, including active and inactive satellites, spent rocket bodies, and fragmented debris. Much of the architecture and operations of the SSN are limited and outdated. Efforts are underway to modernize some elements of the systems. Even so, the ability to maintain the best current Space Situational Awareness (SSA) picture and identify emerging events in a timely fashion could be significantly improved by leveraging non-traditional sensor sites. Orbit Logic, the University of Colorado and the University of Texas at Austin are developing an innovative architecture and operations concept to coordinate the tasking and observation information processing of non - traditional assets based on information-theoretic approaches. These confirmed tasking schedules and the resulting data can then be used to "inform" the SSN tasking process. The 'Heimdall Web' system is comprised of core tasking optimization components and accompanying Web interfaces within a secure, split architecture that will for the first time allow non-traditional sensors to support SSA and improve SSN tasking. Heimdall Web application components appropriately score/prioritize space catalog objects based on covariance, priority, observability, expected information gain, and probability of detect - then coordinate an efficient sensor observation schedule for non-SSN sensors contributing to the overall SSA picture maintained by the Joint Space Operations Center (JSpOC). The Heimdall Web Ops concept supports sensor participation levels of "Scheduled", "Tasked" and "Contributing". Scheduled and Tasked sensors are provided optimized observation schedules or object tracking lists from central algorithms, while Contributing sensors review and select from a list of "desired track objects". All sensors are "Web Enabled" for tasking and feedback, supplying observation schedules, confirmed observations and related data back to Heimdall Web to complete the feedback loop for the next scheduling iteration.

  12. The embedded operating system project

    NASA Technical Reports Server (NTRS)

    Campbell, R. H.

    1985-01-01

    The design and construction of embedded operating systems for real-time advanced aerospace applications was investigated. The applications require reliable operating system support that must accommodate computer networks. Problems that arise in the construction of such operating systems, reconfiguration, consistency and recovery in a distributed system, and the issues of real-time processing are reported. A thesis that provides theoretical foundations for the use of atomic actions to support fault tolerance and data consistency in real-time object-based system is included. The following items are addressed: (1) atomic actions and fault-tolerance issues; (2) operating system structure; (3) program development; (4) a reliable compiler for path Pascal; and (5) mediators, a mechanism for scheduling distributed system processes.

  13. Benefit Assessment for Metroplex Tactical Runway Configuration Management (mTRCM) in a Simulated Environment

    NASA Technical Reports Server (NTRS)

    Phojanamongkolkij, Nipa; Oseguera-Lohr, Rosa M.; Lohr, Gary W.; Robbins, Steven W.; Fenbert, James W.; Hartman, Christopher L.

    2015-01-01

    The System-Oriented Runway Management (SORM) concept is a collection of capabilities focused on a more efficient use of runways while considering all of the factors that affect runway use. Tactical Runway Configuration Management (TRCM), one of the SORM capabilities, provides runway configuration and runway usage recommendations, and monitoring the active runway configuration for suitability given existing factors. This report focuses on the metroplex environment, with two or more proximate airports having arrival and departure operations that are highly interdependent. The myriad of factors that affect metroplex opeations require consideration in arriving at runway configurations that collectively best serve the system as a whole. To assess the metroplex TRCM (mTRCM) benefit, the performance metrics must be compared with the actual historical operations. The historical configuration schedules can be viewed as the schedules produced by subject matter experts (SMEs), and therefore are referred to as the SMEs' schedules. These schedules were obtained from the FAA's Aviation System Performance Metrics (ASPM) database; this is the most representative information regarding runway configuration selection by SMEs. This report focused on a benefit assessment of total delay, transit time, and throughput efficiency (TE) benefits using the mTRCM algorithm at representative volumes for today's traffic at the New York metroplex (N90).

  14. A discrete artificial bee colony algorithm incorporating differential evolution for the flow-shop scheduling problem with blocking

    NASA Astrophysics Data System (ADS)

    Han, Yu-Yan; Gong, Dunwei; Sun, Xiaoyan

    2015-07-01

    A flow-shop scheduling problem with blocking has important applications in a variety of industrial systems but is underrepresented in the research literature. In this study, a novel discrete artificial bee colony (ABC) algorithm is presented to solve the above scheduling problem with a makespan criterion by incorporating the ABC with differential evolution (DE). The proposed algorithm (DE-ABC) contains three key operators. One is related to the employed bee operator (i.e. adopting mutation and crossover operators of discrete DE to generate solutions with good quality); the second is concerned with the onlooker bee operator, which modifies the selected solutions using insert or swap operators based on the self-adaptive strategy; and the last is for the local search, that is, the insert-neighbourhood-based local search with a small probability is adopted to improve the algorithm's capability in exploitation. The performance of the proposed DE-ABC algorithm is empirically evaluated by applying it to well-known benchmark problems. The experimental results show that the proposed algorithm is superior to the compared algorithms in minimizing the makespan criterion.

  15. Capability of the Maximax&Maximin selection operator in the evolutionary algorithm for a nurse scheduling problem

    NASA Astrophysics Data System (ADS)

    Ramli, Razamin; Tein, Lim Huai

    2016-08-01

    A good work schedule can improve hospital operations by providing better coverage with appropriate staffing levels in managing nurse personnel. Hence, constructing the best nurse work schedule is the appropriate effort. In doing so, an improved selection operator in the Evolutionary Algorithm (EA) strategy for a nurse scheduling problem (NSP) is proposed. The smart and efficient scheduling procedures were considered. Computation of the performance of each potential solution or schedule was done through fitness evaluation. The best so far solution was obtained via special Maximax&Maximin (MM) parent selection operator embedded in the EA, which fulfilled all constraints considered in the NSP.

  16. Estimating job runtime for CMS analysis jobs

    NASA Astrophysics Data System (ADS)

    Sfiligoi, I.

    2014-06-01

    The basic premise of pilot systems is to create an overlay scheduling system on top of leased resources. And by definition, leases have a limited lifetime, so any job that is scheduled on such resources must finish before the lease is over, or it will be killed and all the computation is wasted. In order to effectively schedule jobs to resources, the pilot system thus requires the expected runtime of the users' jobs. Past studies have shown that relying on user provided estimates is not a valid strategy, so the system should try to make an estimate by itself. This paper provides a study of the historical data obtained from the Compact Muon Solenoid (CMS) experiment's Analysis Operations submission system. Clear patterns are observed, suggesting that making prediction of an expected job lifetime range is achievable with high confidence level in this environment.

  17. StarBase: A Firm Real-Time Database Manager for Time-Critical Applications

    DTIC Science & Technology

    1995-01-01

    Mellon University [IO]. StarBase differs from previous RT-DBMS work [l, 2, 31 in that a) it relies on a real - time operating system which provides...simulation studies, StarBase uses a real - time operating system to provide basic real-time functionality and deals with issues beyond transaction...re- source scheduling provided by the underlying real - time operating system . Issues of data contention are dealt with by use of a priority

  18. Test development for the thermionic system evaluation test (TSET) project

    NASA Astrophysics Data System (ADS)

    Morris, D. Brent; Standley, Vaughn H.; Schuller, Michael J.

    1992-01-01

    The arrival of a Soviet TOPAZ-II space nuclear reactor affords the US space nuclear power (SNP) community the opportunity to study an assembled thermionic conversion power system. The TOPAZ-II will be studied via the Thermionic System Evaluation Test (TSET) Project. This paper is devoted to the discussion of TSET test development as related to the objectives contained in the TSET Project Plan (Standley et al. 1991). The objectives contained in the Project Plan are the foundation for scheduled TSET tests on TOPAZ-II and are derived from the needs of the Air Force Thermionic SNP program. Our ability to meet the objectives is bounded by unique constraints, such as procurement requirements, operational limitations, and necessary interaction between US and Soviet Scientists and engineers. The fulfillment of the test objectives involves a thorough methodology of test scheduling and data managment. The overall goals for the TSET program are gaining technical understanding of a thermionic SNP system and demonstrating the capabilities and limitations of such a system while assisting in the training of US scientist and engineers in preparation for US SNP system testing. Tests presently scheduled as part of TSET include setup, demonstration, and verification tests; normal and off-normal operating test, and system and component performance tests.

  19. Center for Ground Vehicle Development and Integration

    DTIC Science & Technology

    2011-04-22

    UNCLASSIFIED OPSEC# 21798 CGVDI Organizational Chart CGVDI Director Project and Operations Management Project Management Operations Management Engineered...Metals Welding Assembly / Paint UNCLASSIFIED UNCLASSIFIED OPSEC# 21798 Project and Operations Management CGVDI serves as a single entry point to RDECOM...for ground vehicle system integration projects, as well as for managing cost, schedule, performance and risk. Project Management Operations

  20. Satellite antenna management system and method

    NASA Technical Reports Server (NTRS)

    Leath, Timothy T (Inventor); Azzolini, John D (Inventor)

    1999-01-01

    The antenna management system and method allow a satellite to communicate with a ground station either directly or by an intermediary of a second satellite, thus permitting communication even when the satellite is not within range of the ground station. The system and method employ five major software components, which are the control and initialization module, the command and telemetry handler module, the contact schedule processor module, the contact state machining module, and the telemetry state machine module. The control and initialization module initializes the system and operates the main control cycle, in which the other modules are called. The command and telemetry handler module handles communication to and from the ground station. The contact scheduler processor module handles the contact entry schedules to allow scheduling of contacts with the second satellite. The contact and telemetry state machine modules handle the various states of the satellite in beginning, maintaining and ending contact with the second satellite and in beginning, maintaining and ending communication with the satellite.

  1. Flexible operation of batteries in power system scheduling with renewable energy

    DOE PAGES

    Li, Nan; Uckun, Canan; Constantinescu, Emil M.; ...

    2015-12-17

    The fast growing expansion of renewable energy increases the complexities in balancing generation and demand in the power system. The energy-shifting and fast-ramping capability of energy storage has led to increasing interests in batteries to facilitate the integration of renewable resources. In this paper, we present a two-step framework to evaluate the potential value of energy storage in power systems with renewable generation. First, we formulate a stochastic unit commitment approach with wind power forecast uncertainty and energy storage. Second, the solution from the stochastic unit commitment is used to derive a flexible schedule for energy storage in economic dispatchmore » where the look-ahead horizon is limited. Here, analysis is conducted on the IEEE 24-bus system to demonstrate the benefits of battery storage in systems with renewable resources and the effectiveness of the proposed battery operation strategy.« less

  2. Task path planning, scheduling and learning for free-ranging robot systems

    NASA Technical Reports Server (NTRS)

    Wakefield, G. Steve

    1987-01-01

    The development of robotics applications for space operations is often restricted by the limited movement available to guided robots. Free ranging robots can offer greater flexibility than physically guided robots in these applications. Presented here is an object oriented approach to path planning and task scheduling for free-ranging robots that allows the dynamic determination of paths based on the current environment. The system also provides task learning for repetitive jobs. This approach provides a basis for the design of free-ranging robot systems which are adaptable to various environments and tasks.

  3. Concepts, requirements, and design approaches for building successful planning and scheduling systems

    NASA Technical Reports Server (NTRS)

    Hornstein, Rhoda Shaller; Willoughby, John K.

    1991-01-01

    Traditional practice of systems engineering management assumes requirements can be precisely determined and unambiguously defined prior to system design and implementation; practice further assumes requirements are held static during implementation. Human-computer decision support systems for service planning and scheduling applications do not conform well to these assumptions. Adaptation to the traditional practice of systems engineering management are required. Basic technology exists to support these adaptations. Additional innovations must be encouraged and nutured. Continued partnership between the programmatic and technical perspective assures proper balance of the impossible with the possible. Past problems have the following origins: not recognizing the unusual and perverse nature of the requirements for planning and scheduling; not recognizing the best starting point assumptions for the design; not understanding the type of system that being built; and not understanding the design consequences of the operations concept selected.

  4. Time Triggered Ethernet System Testing Means and Method

    NASA Technical Reports Server (NTRS)

    Smithgall, William Todd (Inventor); Hall, Brendan (Inventor); Varadarajan, Srivatsan (Inventor)

    2014-01-01

    Methods and apparatus are provided for evaluating the performance of a Time Triggered Ethernet (TTE) system employing Time Triggered (TT) communication. A real TTE system under test (SUT) having real input elements communicating using TT messages with output elements via one or more first TTE switches during a first time interval schedule established for the SUT. A simulation system is also provided having input simulators that communicate using TT messages via one or more second TTE switches with the same output elements during a second time interval schedule established for the simulation system. The first and second time interval schedules are off-set slightly so that messages from the input simulators, when present, arrive at the output elements prior to messages from the analogous real inputs, thereby having priority over messages from the real inputs and causing the system to operate based on the simulated inputs when present.

  5. Multi-objective AGV scheduling in an FMS using a hybrid of genetic algorithm and particle swarm optimization.

    PubMed

    Mousavi, Maryam; Yap, Hwa Jen; Musa, Siti Nurmaya; Tahriri, Farzad; Md Dawal, Siti Zawiah

    2017-01-01

    Flexible manufacturing system (FMS) enhances the firm's flexibility and responsiveness to the ever-changing customer demand by providing a fast product diversification capability. Performance of an FMS is highly dependent upon the accuracy of scheduling policy for the components of the system, such as automated guided vehicles (AGVs). An AGV as a mobile robot provides remarkable industrial capabilities for material and goods transportation within a manufacturing facility or a warehouse. Allocating AGVs to tasks, while considering the cost and time of operations, defines the AGV scheduling process. Multi-objective scheduling of AGVs, unlike single objective practices, is a complex and combinatorial process. In the main draw of the research, a mathematical model was developed and integrated with evolutionary algorithms (genetic algorithm (GA), particle swarm optimization (PSO), and hybrid GA-PSO) to optimize the task scheduling of AGVs with the objectives of minimizing makespan and number of AGVs while considering the AGVs' battery charge. Assessment of the numerical examples' scheduling before and after the optimization proved the applicability of all the three algorithms in decreasing the makespan and AGV numbers. The hybrid GA-PSO produced the optimum result and outperformed the other two algorithms, in which the mean of AGVs operation efficiency was found to be 69.4, 74, and 79.8 percent in PSO, GA, and hybrid GA-PSO, respectively. Evaluation and validation of the model was performed by simulation via Flexsim software.

  6. Multi-objective AGV scheduling in an FMS using a hybrid of genetic algorithm and particle swarm optimization

    PubMed Central

    Yap, Hwa Jen; Musa, Siti Nurmaya; Tahriri, Farzad; Md Dawal, Siti Zawiah

    2017-01-01

    Flexible manufacturing system (FMS) enhances the firm’s flexibility and responsiveness to the ever-changing customer demand by providing a fast product diversification capability. Performance of an FMS is highly dependent upon the accuracy of scheduling policy for the components of the system, such as automated guided vehicles (AGVs). An AGV as a mobile robot provides remarkable industrial capabilities for material and goods transportation within a manufacturing facility or a warehouse. Allocating AGVs to tasks, while considering the cost and time of operations, defines the AGV scheduling process. Multi-objective scheduling of AGVs, unlike single objective practices, is a complex and combinatorial process. In the main draw of the research, a mathematical model was developed and integrated with evolutionary algorithms (genetic algorithm (GA), particle swarm optimization (PSO), and hybrid GA-PSO) to optimize the task scheduling of AGVs with the objectives of minimizing makespan and number of AGVs while considering the AGVs’ battery charge. Assessment of the numerical examples’ scheduling before and after the optimization proved the applicability of all the three algorithms in decreasing the makespan and AGV numbers. The hybrid GA-PSO produced the optimum result and outperformed the other two algorithms, in which the mean of AGVs operation efficiency was found to be 69.4, 74, and 79.8 percent in PSO, GA, and hybrid GA-PSO, respectively. Evaluation and validation of the model was performed by simulation via Flexsim software. PMID:28263994

  7. On-Line Remote Catalog Access and Circulation Control System. Part I: Functional Specifications. Part II: User's Manual.

    ERIC Educational Resources Information Center

    International Business Machines Corp., Gaithersburg, MD. Data Processing Div.

    The Ohio State University Libraries On-line Remote Catalog Access and Circulation Control System (LCS) began on-line operations with the conversion of one department library in November 1970. By December all 26 libraries had been converted to the automated system and LCS was fully operational one month ahead of schedule. LCS is designed as a…

  8. A Prototype System for a Computer-Based Statewide Film Library Network: A Model for Operation. Statewide Film Library Network: System-1 Specifications - Files.

    ERIC Educational Resources Information Center

    Sullivan, Todd

    Using an IBM System/360 Model 50 computer, the New York Statewide Film Library Network schedules film use, reports on materials handling and statistics, and provides for interlibrary loan of films. Communications between the film libraries and the computer are maintained by Teletype model 33 ASR Teletypewriter terminals operating on TWX…

  9. Artificial intelligence for the CTA Observatory scheduler

    NASA Astrophysics Data System (ADS)

    Colomé, Josep; Colomer, Pau; Campreciós, Jordi; Coiffard, Thierry; de Oña, Emma; Pedaletti, Giovanna; Torres, Diego F.; Garcia-Piquer, Alvaro

    2014-08-01

    The Cherenkov Telescope Array (CTA) project will be the next generation ground-based very high energy gamma-ray instrument. The success of the precursor projects (i.e., HESS, MAGIC, VERITAS) motivated the construction of this large infrastructure that is included in the roadmap of the ESFRI projects since 2008. CTA is planned to start the construction phase in 2015 and will consist of two arrays of Cherenkov telescopes operated as a proposal-driven open observatory. Two sites are foreseen at the southern and northern hemispheres. The CTA observatory will handle several observation modes and will have to operate tens of telescopes with a highly efficient and reliable control. Thus, the CTA planning tool is a key element in the control layer for the optimization of the observatory time. The main purpose of the scheduler for CTA is the allocation of multiple tasks to one single array or to multiple sub-arrays of telescopes, while maximizing the scientific return of the facility and minimizing the operational costs. The scheduler considers long- and short-term varying conditions to optimize the prioritization of tasks. A short-term scheduler provides the system with the capability to adapt, in almost real-time, the selected task to the varying execution constraints (i.e., Targets of Opportunity, health or status of the system components, environment conditions). The scheduling procedure ensures that long-term planning decisions are correctly transferred to the short-term prioritization process for a suitable selection of the next task to execute on the array. In this contribution we present the constraints to CTA task scheduling that helped classifying it as a Flexible Job-Shop Problem case and finding its optimal solution based on Artificial Intelligence techniques. We describe the scheduler prototype that uses a Guarded Discrete Stochastic Neural Network (GDSN), for an easy representation of the possible long- and short-term planning solutions, and Constraint Propagation techniques. A simulation platform, an analysis tool and different test case scenarios for CTA were developed to test the performance of the scheduler and are also described.

  10. Linux OS Jitter Measurements at Large Node Counts using a BlueGene/L

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jones, Terry R; Tauferner, Mr. Andrew; Inglett, Mr. Todd

    2010-01-01

    We present experimental results for a coordinated scheduling implementation of the Linux operating system. Results were collected on an IBM Blue Gene/L machine at scales up to 16K nodes. Our results indicate coordinated scheduling was able to provide a dramatic improvement in scaling performance for two applications characterized as bulk synchronous parallel programs.

  11. GSFC Technology Development Center Report

    NASA Technical Reports Server (NTRS)

    Himwich, Ed; Gipson, John

    2013-01-01

    This report summarizes the activities of the GSFC Technology Development Center (TDC) for 2012 and forecasts planned activities for 2013. The GSFC TDC develops station software including the Field System (FS), scheduling software (SKED), hardware including tools for station timing and meteorology, scheduling algorithms, and operational procedures. It provides a pool of individuals to assist with station implementation, check-out, upgrades, and training.

  12. Quarterly Update: July-September 1990

    DTIC Science & Technology

    1990-09-01

    drafted a report that defines the process and the products of a feature oriented domain analysis ( FODA ) and provides a sample do- main analysis . This...receive ............... training to offer assessment services commercially. This section provides NASA adopted the rate monotonic scheduling analysis ...that the rate monotonic scheduling analysis approach will be the JulySeptember 1990 baseline methodology for its hard real-time operating system

  13. Design and Operation of Automated Ice-Tethered Profilers for Real-Time Seawater Observations in the Polar Oceans

    DTIC Science & Technology

    2006-06-01

    of the system (up to 3 years depending on the profiling schedule ). Shortly after deployment, each ITP begins profiling the water column at its...was programmed with accelerated sampling schedules of multiple one-way traverses per day between 10 and 750-760 m depth in order to quickly evaluate endurance and component fatigue.

  14. 47 CFR 1.1107 - Schedule of charges for applications and other filings for the international services.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) (per system) 312 & 159 180.00 CGV 7. Mobile Satellite Earth Stations: a. Initial Applications of.../Receive Earth Stations: a. Initial Application (per station) 312 Main & Schedule B & 159 2,615.00 BAX b... 180.00 CGX 4. Fixed Satellite transmit/receive Earth Stations (2 meters or less operating in the 4/6...

  15. Surface Movement Guidance and Control System

    DOT National Transportation Integrated Search

    1996-12-12

    This Advisory Circular (AC) describes the standards and provides guidance in the : development of a Surface Movement Guidance and Control System (SMGCS) plan for : U.S. airports where scheduled Air Carriers are authorized to conduct operations : when...

  16. Dispatch Scheduling of Automated Telescopes

    NASA Astrophysics Data System (ADS)

    Denny, R. B.

    2004-05-01

    Automated telescope scheduling systems have traditionally focused on optimiz- ing the use of the observatory, minimizing overhead and maximizing shutter- open time. However, educational and amateur observatories do not enjoy con- sistently good skies. Conditions can change significantly during an observing session, leading to schedule breakage. This gives rise to the need for a scheduling system that is capable of recovering from periods of bad skies, wind, etc. without operator intervention. The concept of dispatch scheduling, where the scheduler makes a "best" choice for the next observation, will be discussed. The choice of next target must consider constraints such as mini- mum altitude or maximum air mass, moon illumination, and sky condition, as well as timing constraints that may arise from linked observations and/or target phasing requirements. It also must be as fair and efficient as prac- tical. A dispatch scheduler (ACPS) was constructed and used to perform a num- ber of simulations with both isolated and multiple/linked observations, and noisy timing. By varying "best next target" choice algorithm, these simula- tions provided insight into the behavior of a dispatch scheduler. This talk will describe the scheduler and present the results of these preliminary sim- ulations, some conclusions that arose from them, and outline areas for fur- ther research.

  17. Management Information in Tertiary Institutions.

    ERIC Educational Resources Information Center

    Findlay, A. W.

    1981-01-01

    A college or university's management information system corresponds roughly to the institution's structure, with these elements in descending order in the hierarchy: policy and planning, a planning system, control and coordination, and typical operating systems (payroll, exams, scheduling, library, facilities assignments, and accounting…

  18. Operations planning simulation: Model study

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The use of simulation modeling for the identification of system sensitivities to internal and external forces and variables is discussed. The technique provides a means of exploring alternate system procedures and processes, so that these alternatives may be considered on a mutually comparative basis permitting the selection of a mode or modes of operation which have potential advantages to the system user and the operator. These advantages are measurements is system efficiency are: (1) the ability to meet specific schedules for operations, mission or mission readiness requirements or performance standards and (2) to accomplish the objectives within cost effective limits.

  19. Cost Minimization for Joint Energy Management and Production Scheduling Using Particle Swarm Optimization

    NASA Astrophysics Data System (ADS)

    Shah, Rahul H.

    Production costs account for the largest share of the overall cost of manufacturing facilities. With the U.S. industrial sector becoming more and more competitive, manufacturers are looking for more cost and resource efficient working practices. Operations management and production planning have shown their capability to dramatically reduce manufacturing costs and increase system robustness. When implementing operations related decision making and planning, two fields that have shown to be most effective are maintenance and energy. Unfortunately, the current research that integrates both is limited. Additionally, these studies fail to consider parameter domains and optimization on joint energy and maintenance driven production planning. Accordingly, production planning methodology that considers maintenance and energy is investigated. Two models are presented to achieve well-rounded operating strategy. The first is a joint energy and maintenance production scheduling model. The second is a cost per part model considering maintenance, energy, and production. The proposed methodology will involve a Time-of-Use electricity demand response program, buffer and holding capacity, station reliability, production rate, station rated power, and more. In practice, the scheduling problem can be used to determine a joint energy, maintenance, and production schedule. Meanwhile, the cost per part model can be used to: (1) test the sensitivity of the obtained optimal production schedule and its corresponding savings by varying key production system parameters; and (2) to determine optimal system parameter combinations when using the joint energy, maintenance, and production planning model. Additionally, a factor analysis on the system parameters is conducted and the corresponding performance of the production schedule under variable parameter conditions, is evaluated. Also, parameter optimization guidelines that incorporate maintenance and energy parameter decision making in the production planning framework are discussed. A modified Particle Swarm Optimization solution technique is adopted to solve the proposed scheduling problem. The algorithm is described in detail and compared to Genetic Algorithm. Case studies are presented to illustrate the benefits of using the proposed model and the effectiveness of the Particle Swarm Optimization approach. Numerical Experiments are implemented and analyzed to test the effectiveness of the proposed model. The proposed scheduling strategy can achieve savings of around 19 to 27 % in cost per part when compared to the baseline scheduling scenarios. By optimizing key production system parameters from the cost per part model, the baseline scenarios can obtain around 20 to 35 % in savings for the cost per part. These savings further increase by 42 to 55 % when system parameter optimization is integrated with the proposed scheduling problem. Using this method, the most influential parameters on the cost per part are the rated power from production, the production rate, and the initial machine reliabilities. The modified Particle Swarm Optimization algorithm adopted allows greater diversity and exploration compared to Genetic Algorithm for the proposed joint model which results in it being more computationally efficient in determining the optimal scheduling. While Genetic Algorithm could achieve a solution quality of 2,279.63 at an expense of 2,300 seconds in computational effort. In comparison, the proposed Particle Swarm Optimization algorithm achieved a solution quality of 2,167.26 in less than half the computation effort which is required by Genetic Algorithm.

  20. A DAG Scheduling Scheme on Heterogeneous Computing Systems Using Tuple-Based Chemical Reaction Optimization

    PubMed Central

    Jiang, Yuyi; Shao, Zhiqing; Guo, Yi

    2014-01-01

    A complex computing problem can be solved efficiently on a system with multiple computing nodes by dividing its implementation code into several parallel processing modules or tasks that can be formulated as directed acyclic graph (DAG) problems. The DAG jobs may be mapped to and scheduled on the computing nodes to minimize the total execution time. Searching an optimal DAG scheduling solution is considered to be NP-complete. This paper proposed a tuple molecular structure-based chemical reaction optimization (TMSCRO) method for DAG scheduling on heterogeneous computing systems, based on a very recently proposed metaheuristic method, chemical reaction optimization (CRO). Comparing with other CRO-based algorithms for DAG scheduling, the design of tuple reaction molecular structure and four elementary reaction operators of TMSCRO is more reasonable. TMSCRO also applies the concept of constrained critical paths (CCPs), constrained-critical-path directed acyclic graph (CCPDAG) and super molecule for accelerating convergence. In this paper, we have also conducted simulation experiments to verify the effectiveness and efficiency of TMSCRO upon a large set of randomly generated graphs and the graphs for real world problems. PMID:25143977

  1. A DAG scheduling scheme on heterogeneous computing systems using tuple-based chemical reaction optimization.

    PubMed

    Jiang, Yuyi; Shao, Zhiqing; Guo, Yi

    2014-01-01

    A complex computing problem can be solved efficiently on a system with multiple computing nodes by dividing its implementation code into several parallel processing modules or tasks that can be formulated as directed acyclic graph (DAG) problems. The DAG jobs may be mapped to and scheduled on the computing nodes to minimize the total execution time. Searching an optimal DAG scheduling solution is considered to be NP-complete. This paper proposed a tuple molecular structure-based chemical reaction optimization (TMSCRO) method for DAG scheduling on heterogeneous computing systems, based on a very recently proposed metaheuristic method, chemical reaction optimization (CRO). Comparing with other CRO-based algorithms for DAG scheduling, the design of tuple reaction molecular structure and four elementary reaction operators of TMSCRO is more reasonable. TMSCRO also applies the concept of constrained critical paths (CCPs), constrained-critical-path directed acyclic graph (CCPDAG) and super molecule for accelerating convergence. In this paper, we have also conducted simulation experiments to verify the effectiveness and efficiency of TMSCRO upon a large set of randomly generated graphs and the graphs for real world problems.

  2. Scheduling Results for the THEMIS Observation Scheduling Tool

    NASA Technical Reports Server (NTRS)

    Mclaren, David; Rabideau, Gregg; Chien, Steve; Knight, Russell; Anwar, Sadaat; Mehall, Greg; Christensen, Philip

    2011-01-01

    We describe a scheduling system intended to assist in the development of instrument data acquisitions for the THEMIS instrument, onboard the Mars Odyssey spacecraft, and compare results from multiple scheduling algorithms. This tool creates observations of both (a) targeted geographical regions of interest and (b) general mapping observations, while respecting spacecraft constraints such as data volume, observation timing, visibility, lighting, season, and science priorities. This tool therefore must address both geometric and state/timing/resource constraints. We describe a tool that maps geometric polygon overlap constraints to set covering constraints using a grid-based approach. These set covering constraints are then incorporated into a greedy optimization scheduling algorithm incorporating operations constraints to generate feasible schedules. The resultant tool generates schedules of hundreds of observations per week out of potential thousands of observations. This tool is currently under evaluation by the THEMIS observation planning team at Arizona State University.

  3. Future Air Traffic Growth and Schedule Model, Supplement

    NASA Technical Reports Server (NTRS)

    Kimmel, William M. (Technical Monitor); Smith, Jeremy C.; Dollyhigh, Samuel M.

    2004-01-01

    The Future Air Traffic Growth and Schedule Model was developed as an implementation of the Fratar algorithm to project future traffic flow between airports in a system and of then scheduling the additional flights to reflect current passenger time-of-travel preferences. The methodology produces an unconstrained future schedule from a current (or baseline) schedule and the airport operations growth rates. As an example of the use of the model, future schedules are projected for 2010 and 2022 for all flights arriving at, departing from, or flying between all continental United States airports that had commercial scheduled service for May 17, 2002. Inter-continental US traffic and airports are included and the traffic is also grown with the Fratar methodology to account for their arrivals and departures to the continental US airports. Input data sets derived from the Official Airline Guide (OAG) data and FAA Terminal Area Forecast (TAF) are included in the examples of the computer code execution.

  4. Exploiting multicore compute resources in the CMS experiment

    NASA Astrophysics Data System (ADS)

    Ramírez, J. E.; Pérez-Calero Yzquierdo, A.; Hernández, J. M.; CMS Collaboration

    2016-10-01

    CMS has developed a strategy to efficiently exploit the multicore architecture of the compute resources accessible to the experiment. A coherent use of the multiple cores available in a compute node yields substantial gains in terms of resource utilization. The implemented approach makes use of the multithreading support of the event processing framework and the multicore scheduling capabilities of the resource provisioning system. Multicore slots are acquired and provisioned by means of multicore pilot agents which internally schedule and execute single and multicore payloads. Multicore scheduling and multithreaded processing are currently used in production for online event selection and prompt data reconstruction. More workflows are being adapted to run in multicore mode. This paper presents a review of the experience gained in the deployment and operation of the multicore scheduling and processing system, the current status and future plans.

  5. A derived heuristics based multi-objective optimization procedure for micro-grid scheduling

    NASA Astrophysics Data System (ADS)

    Li, Xin; Deb, Kalyanmoy; Fang, Yanjun

    2017-06-01

    With the availability of different types of power generators to be used in an electric micro-grid system, their operation scheduling as the load demand changes with time becomes an important task. Besides satisfying load balance constraints and the generator's rated power, several other practicalities, such as limited availability of grid power and restricted ramping of power output from generators, must all be considered during the operation scheduling process, which makes it difficult to decide whether the optimization results are accurate and satisfactory. In solving such complex practical problems, heuristics-based customized optimization algorithms are suggested. However, due to nonlinear and complex interactions of variables, it is difficult to come up with heuristics in such problems off-hand. In this article, a two-step strategy is proposed in which the first task deciphers important heuristics about the problem and the second task utilizes the derived heuristics to solve the original problem in a computationally fast manner. Specifically, the specific operation scheduling is considered from a two-objective (cost and emission) point of view. The first task develops basic and advanced level knowledge bases offline from a series of prior demand-wise optimization runs and then the second task utilizes them to modify optimized solutions in an application scenario. Results on island and grid connected modes and several pragmatic formulations of the micro-grid operation scheduling problem clearly indicate the merit of the proposed two-step procedure.

  6. Operations automation

    NASA Technical Reports Server (NTRS)

    Boreham, Charles Thomas

    1994-01-01

    This is truly the era of 'faster-better-cheaper' at the National Aeronautics and Space Administration/Jet Propulsion Laboratory (NASA/JPL). To continue JPL's primary mission of building and operating interplanetary spacecraft, all possible avenues are being explored in the search for better value for each dollar spent. A significant cost factor in any mission is the amount of manpower required to receive, decode, decommutate, and distribute spacecraft engineering and experiment data. The replacement of the many mission-unique data systems with the single Advanced Multimission Operations System (AMMOS) has already allowed for some manpower reduction. Now, we find that further economies are made possible by drastically reducing the number of human interventions required to perform the setup, data saving, station handover, processed data loading, and tear down activities that are associated with each spacecraft tracking pass. We have recently adapted three public domain tools to the AMMOS system which allow common elements to be scheduled and initialized without the normal human intervention. This is accomplished with a stored weekly event schedule. The manual entries and specialized scripts which had to be provided just prior to and during a pass are now triggered by the schedule to perform the functions unique to the upcoming pass. This combination of public domain software and the AMMOS system has been run in parallel with the flight operation in an online testing phase for six months. With this methodology, a savings of 11 man-years per year is projected with no increase in data loss or project risk. There are even greater savings to be gained as we learn other uses for this configuration.

  7. Development of a Dynamic Operational Scheduling Algorithm for an Independent Micro-Grid with Renewable Energy

    NASA Astrophysics Data System (ADS)

    Obara, Shin'ya

    A micro-grid with the capacity for sustainable energy is expected to be a distributed energy system that exhibits quite a small environmental impact. In an independent micro-grid, “green energy,” which is typically thought of as unstable, can be utilized effectively by introducing a battery. In the past study, the production-of-electricity prediction algorithm (PAS) of the solar cell was developed. In PAS, a layered neural network is made to learn based on past weather data and the operation plan of the compound system of a solar cell and other energy systems was examined using this prediction algorithm. In this paper, a dynamic operational scheduling algorithm is developed using a neural network (PAS) and a genetic algorithm (GA) to provide predictions for solar cell power output. We also do a case study analysis in which we use this algorithm to plan the operation of a system that connects nine houses in Sapporo to a micro-grid composed of power equipment and a polycrystalline silicon solar cell. In this work, the relationship between the accuracy of output prediction of the solar cell and the operation plan of the micro-grid was clarified. Moreover, we found that operating the micro-grid according to the plan derived with PAS was far superior, in terms of equipment hours of operation, to that using past average weather data.

  8. Autonomous power expert system

    NASA Technical Reports Server (NTRS)

    Ringer, Mark J.; Quinn, Todd M.

    1990-01-01

    The goal of the Autonomous Power System (APS) program is to develop and apply intelligent problem solving and control technologies to the Space Station Freedom Electrical Power Systems (SSF/EPS). The objectives of the program are to establish artificial intelligence/expert system technology paths, to create knowledge based tools with advanced human-operator interfaces, and to integrate and interface knowledge-based and conventional control schemes. This program is being developed at the NASA-Lewis. The APS Brassboard represents a subset of a 20 KHz Space Station Power Management And Distribution (PMAD) testbed. A distributed control scheme is used to manage multiple levels of computers and switchgear. The brassboard is comprised of a set of intelligent switchgear used to effectively switch power from the sources to the loads. The Autonomous Power Expert System (APEX) portion of the APS program integrates a knowledge based fault diagnostic system, a power resource scheduler, and an interface to the APS Brassboard. The system includes knowledge bases for system diagnostics, fault detection and isolation, and recommended actions. The scheduler autonomously assigns start times to the attached loads based on temporal and power constraints. The scheduler is able to work in a near real time environment for both scheduling and dynamic replanning.

  9. Autonomous power expert system

    NASA Technical Reports Server (NTRS)

    Ringer, Mark J.; Quinn, Todd M.

    1990-01-01

    The goal of the Autonomous Power System (APS) program is to develop and apply intelligent problem solving and control technologies to the Space Station Freedom Electrical Power Systems (SSF/EPS). The objectives of the program are to establish artificial intelligence/expert system technology paths, to create knowledge based tools with advanced human-operator interfaces, and to integrate and interface knowledge-based and conventional control schemes. This program is being developed at the NASA-Lewis. The APS Brassboard represents a subset of a 20 KHz Space Station Power Management And Distribution (PMAD) testbed. A distributed control scheme is used to manage multiple levels of computers and switchgear. The brassboard is comprised of a set of intelligent switchgear used to effectively switch power from the sources to the loads. The Autonomous Power Expert System (APEX) portion of the APS program integrates a knowledge based fault diagnostic system, a power resource scheduler, and an interface to the APS Brassboard. The system includes knowledge bases for system diagnostics, fault detection and isolation, and recommended actions. The scheduler autonomously assigns start times to the attached loads based on temporal and power constraints. The scheduler is able to work in a near real time environment for both scheduling an dynamic replanning.

  10. Cost efficient operations for Discovery class missions

    NASA Technical Reports Server (NTRS)

    Cameron, G. E.; Landshof, J. A.; Whitworth, G. W.

    1994-01-01

    The Near Earth Asteroid Rendezvous (NEAR) program at The Johns Hopkins University Applied Physics Laboratory is scheduled to launch the first spacecraft in NASA's Discovery program. The Discovery program is to promote low cost spacecraft design, development, and mission operations for planetary space missions. The authors describe the NEAR mission and discuss the design and development of the NEAR Mission Operations System and the NEAR Ground System with an emphasis on those aspects of the design that are conducive to low-cost operations.

  11. Planning and scheduling the Hubble Space Telescope: Practical application of advanced techniques

    NASA Technical Reports Server (NTRS)

    Miller, Glenn E.

    1994-01-01

    NASA's Hubble Space Telescope (HST) is a major astronomical facility that was launched in April, 1990. In late 1993, the first of several planned servicing missions refurbished the telescope, including corrections for a manufacturing flaw in the primary mirror. Orbiting above the distorting effects of the Earth's atmosphere, the HST provides an unrivaled combination of sensitivity, spectral coverage and angular resolution. The HST is arguably the most complex scientific observatory ever constructed and effective use of this valuable resource required novel approaches to astronomical observation and the development of advanced software systems including techniques to represent scheduling preferences and constraints, a constraint satisfaction problem (CSP) based scheduler and a rule based planning system. This paper presents a discussion of these systems and the lessons learned from operational experience.

  12. Reusable Rocket Engine Operability Modeling and Analysis

    NASA Technical Reports Server (NTRS)

    Christenson, R. L.; Komar, D. R.

    1998-01-01

    This paper describes the methodology, model, input data, and analysis results of a reusable launch vehicle engine operability study conducted with the goal of supporting design from an operations perspective. Paralleling performance analyses in schedule and method, this requires the use of metrics in a validated operations model useful for design, sensitivity, and trade studies. Operations analysis in this view is one of several design functions. An operations concept was developed given an engine concept and the predicted operations and maintenance processes incorporated into simulation models. Historical operations data at a level of detail suitable to model objectives were collected, analyzed, and formatted for use with the models, the simulations were run, and results collected and presented. The input data used included scheduled and unscheduled timeline and resource information collected into a Space Transportation System (STS) Space Shuttle Main Engine (SSME) historical launch operations database. Results reflect upon the importance not only of reliable hardware but upon operations and corrective maintenance process improvements.

  13. Automated Scheduling Via Artificial Intelligence

    NASA Technical Reports Server (NTRS)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  14. Scheduling, revenue management, and fairness in an academic-hospital radiology division.

    PubMed

    Baum, Richard; Bertsimas, Dimitris; Kallus, Nathan

    2014-10-01

    Physician staff of academic hospitals today practice in several geographic locations including their main hospital. This is referred to as the extended campus. With extended campuses expanding, the growing complexity of a single division's schedule means that a naive approach to scheduling compromises revenue. Moreover, it may provide an unfair allocation of individual revenue, desirable or burdensome assignments, and the extent to which the preferences of each individual are met. This has adverse consequences on incentivization and employee satisfaction and is simply against business policy. We identify the daily scheduling of physicians in this context as an operational problem that incorporates scheduling, revenue management, and fairness. Noting previous success of operations research and optimization in each of these disciplines, we propose a simple unified optimization formulation of this scheduling problem using mixed-integer optimization. Through a study of implementing the approach at the Division of Angiography and Interventional Radiology at the Brigham and Women's Hospital, which is directed by one of the authors, we exemplify the flexibility of the model to adapt to specific applications, the tractability of solving the model in practical settings, and the significant impact of the approach, most notably in increasing revenue by 8.2% over previous operating revenue while adhering strictly to a codified fairness and objectivity. We found that the investment in implementing such a system is far outweighed by the large potential revenue increase and the other benefits outlined. Copyright © 2014 AUR. Published by Elsevier Inc. All rights reserved.

  15. Simulation of textile manufacturing processes for planning, scheduling, and quality control purposes

    NASA Astrophysics Data System (ADS)

    Cropper, A. E.; Wang, Z.

    1995-08-01

    Simulation, as a management information tool, has been applied to engineering manufacture and assembly operations. The application of the principles to textile manufacturing (fiber to fabric) is discussed. The particular problems and solutions in applying the simulation software package to the yarn production processes are discussed with an indication of how the software achieves the production schedule. The system appears to have application in planning, scheduling, and quality assurance. The latter being a result of the traceability possibilities through a process involving mixing and splitting of material.

  16. Airspace Technology Demonstration 2 (ATD-2) Phase 1 Concept of Use (ConUse)

    NASA Technical Reports Server (NTRS)

    Jung, Yoon; Engelland, Shawn; Capps, Richard; Coppenbarger, Rich; Hooey, Becky; Sharma, Shivanjli; Stevens, Lindsay; Verma, Savita; Lohr, Gary; Chevalley, Eric; hide

    2018-01-01

    This document presents an operational Concept of Use (ConUse) for the Phase 1 Baseline Integrated Arrival, Departure, and Surface (IADS) prototype system of NASA's Airspace Technology Demonstration 2 (ATD-2) sub-project, which began demonstration in 2017 at Charlotte Douglas International Airport (CLT). NASA is developing the IADS system under the ATD-2 sub-project in coordination with the Federal Aviation Administration (FAA) and aviation industry partners. The primary goal of ATD-2 sub-project is to improve the predictability and the operational efficiency of the air traffic system in metroplex environments, through the enhancement, development, and integration of the nation's most advanced and sophisticated arrival, departure, and surface prediction, scheduling, and management systems. The ATD-2 effort is a five-year research activity through 2020. The initial phase of the ATD-2 sub-project, which is the focus of this document, will demonstrate the Phase 1 Baseline IADS capability at CLT in 2017. The Phase 1 Baseline IADS capabilities of the ATD-2 sub-project consists of: (a) Strategic and tactical surface scheduling to improve efficiency and predictability of airport surface operations, (b) Tactical departure scheduling to enhance merging of departures into overhead traffic streams via accurate predictions of takeoff times and automated coordination between the Airport Traffic Control Tower (ATCT, or Tower) and the Air Route Traffic Control Center (ARTCC, or Center), (c) Improvements in departure surface demand predictions in Time Based Flow Management (TBFM), (d) A prototype Electronic Flight Data (EFD) system provided by the FAA via the Terminal Flight Data Manager (TFDM) early implementation effort, and (e) Improved situational awareness and demand predictions through integration with the Traffic Flow Management System (TFMS), TBFM, and TFDM (3Ts) for electronic data integration and exchange, and an on-screen dashboard displaying pertinent analytics in real-time. The surface scheduling and metering element of the capability is consistent with the Surface CDM Concept of Operations published in 2014 by the FAA Surface Operations Directorate.1 Upon successful demonstration of the Phase 1 Baseline IADS capability, follow-on demonstrations of the matured IADS traffic management capabilities will be conducted in the 2018-2020 timeframe. At the end of each phase of the demonstrations, NASA will transfer the ATD-2 sub-project technology to the FAA and industry partners.

  17. Integrated scheduling and resource management. [for Space Station Information System

    NASA Technical Reports Server (NTRS)

    Ward, M. T.

    1987-01-01

    This paper examines the problem of integrated scheduling during the Space Station era. Scheduling for Space Station entails coordinating the support of many distributed users who are sharing common resources and pursuing individual and sometimes conflicting objectives. This paper compares the scheduling integration problems of current missions with those anticipated for the Space Station era. It examines the facilities and the proposed operations environment for Space Station. It concludes that the pattern of interdependecies among the users and facilities, which are the source of the integration problem is well structured, allowing a dividing of the larger problem into smaller problems. It proposes an architecture to support integrated scheduling by scheduling efficiently at local facilities as a function of dependencies with other facilities of the program. A prototype is described that is being developed to demonstrate this integration concept.

  18. Scheduler Design Criteria: Requirements and Considerations

    NASA Technical Reports Server (NTRS)

    Lee, Hanbong

    2016-01-01

    This presentation covers fundamental requirements and considerations for developing schedulers in airport operations. We first introduce performance and functional requirements for airport surface schedulers. Among various optimization problems in airport operations, we focus on airport surface scheduling problem, including runway and taxiway operations. We then describe a basic methodology for airport surface scheduling such as node-link network model and scheduling algorithms previously developed. Next, we explain how to design a mathematical formulation in more details, which consists of objectives, decision variables, and constraints. Lastly, we review other considerations, including optimization tools, computational performance, and performance metrics for evaluation.

  19. Morgantown People Mover Collision Avoidance System Design Summary

    DOT National Transportation Integrated Search

    1980-09-01

    The Morgantown People Mover (MPM) is an automated two-mode (schedule and demand) transit system that consists of a fleet of electrically powered, rubber-tired, passenger-carrying vehicles operating on a dedicated guideway under computer control. The ...

  20. Optimizing Water Use and Hydropower Production in Operational Reservoir System Scheduling with RiverWare

    NASA Astrophysics Data System (ADS)

    Magee, T. M.; Zagona, E. A.

    2017-12-01

    Practical operational optimization of multipurpose reservoir systems is challenging for several reasons. Each purpose has its own constraints which may conflict with those of other purposes. While hydropower generation typically provides the bulk of the revenue, it is also among the lowest priority purposes. Each river system has important details that are specific to the location such as hydrology, reservoir storage capacity, physical limitations, bottlenecks, and the continuing evolution of operational policy. In addition, reservoir operations models include discrete, nonlinear, and nonconvex physical processes and if-then operating policies. Typically, the forecast horizon for scheduling needs to be extended far into the future to avoid near term (e.g., a few hours or a day) scheduling decisions that result in undesirable future states; this makes the computational effort much larger than may be expected. Put together, these challenges lead to large and customized mathematical optimization problems which must be solved efficiently to be of practical use. In addition, the solution process must be robust in an operational setting. We discuss a unique modeling approach in RiverWare that meets these challenges in an operational setting. The approach combines a Preemptive Linear Goal Programming optimization model to handle prioritized policies complimented by preprocessing and postprocessing with Rulebased Simulation to improve the solution with regard to nonlinearities, discrete issues, and if-then logic. An interactive policy language with a graphical user interface allows modelers to customize both the optimization and simulation based on the unique aspects of the policy for their system while the routine physical aspect of operations are modeled automatically. The modeler is aided by a set of compiled predefined functions and functions shared by other modelers. We illustrate the success of the approach with examples from daily use at the Tennessee Valley Authority, the Bonneville Power Administration, and public utility districts on the Mid-Columbia River. We discuss recent innovations to improve solution quality, robustness, and performance for these systems. We conclude with new modeling challenges to extend the modeling approach to other uses.

  1. Intermittent Control Systems

    ERIC Educational Resources Information Center

    Montgomery, Thomas L.; And Others

    1975-01-01

    The technique of intermittent control systems for air quality control as developed and used by the Tennessee Valley Authority is investigated. Although controversial, all Tennessee Valley Authority sulfur dioxide elimination programs are scheduled to be operational this year. Existing or anticipated intermittent control systems are identified. (BT)

  2. 40 CFR 243.204-2 - Recommended procedures: Operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... collection system. These records should be used for scheduling maintenance and replacement, for budgeting, and for system evaluation and comparison. (b) The collection system should be reviewed on a regular...) SOLID WASTES GUIDELINES FOR THE STORAGE AND COLLECTION OF RESIDENTIAL, COMMERCIAL, AND INSTITUTIONAL...

  3. 9 CFR 354.26 - Schedule of operation of official plants.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Performance of Services § 354.26 Schedule of operation of official plants. Inspection operating schedules for... operation shall be reasonably uniform from day to day. Inspectors are to be notified by management 1 day in advance of any change in the hours inspection service is requested. Application for Inspection Service ...

  4. Precision Departure Release Capability (PDRC) Final Report

    NASA Technical Reports Server (NTRS)

    Engelland, Shawn A.; Capps, Richard; Day, Kevin Brian; Kistler, Matthew Stephen; Gaither, Frank; Juro, Greg

    2013-01-01

    After takeoff, aircraft must merge into en route (Center) airspace traffic flows that may be subject to constraints that create localized demand/capacity imbalances. When demand exceeds capacity, Traffic Management Coordinators (TMCs) and Frontline Managers (FLMs) often use tactical departure scheduling to manage the flow of departures into the constrained Center traffic flow. Tactical departure scheduling usually involves a Call for Release (CFR) procedure wherein the Tower must call the Center to coordinate a release time prior to allowing the flight to depart. In present-day operations release times are computed by the Center Traffic Management Advisor (TMA) decision support tool, based upon manual estimates of aircraft ready time verbally communicated from the Tower to the Center. The TMA-computed release time is verbally communicated from the Center back to the Tower where it is relayed to the Local controller as a release window that is typically three minutes wide. The Local controller will manage the departure to meet the coordinated release time window. Manual ready time prediction and verbal release time coordination are labor intensive and prone to inaccuracy. Also, use of release time windows adds uncertainty to the tactical departure process. Analysis of more than one million flights from January 2011 indicates that a significant number of tactically scheduled aircraft missed their en route slot due to ready time prediction uncertainty. Uncertainty in ready time estimates may result in missed opportunities to merge into constrained en route flows and lead to lost throughput. Next Generation Air Transportation System plans call for development of Tower automation systems capable of computing surface trajectory-based ready time estimates. NASA has developed the Precision Departure Release Capability (PDRC) concept that improves tactical departure scheduling by automatically communicating surface trajectory-based ready time predictions and departure runway assignments to the Center scheduling tool. The PDRC concept also incorporates earlier NASA and FAA research into automation-assisted CFR coordination. The PDRC concept reduces uncertainty by automatically communicating coordinated release times with seconds-level precision enabling TMCs and FLMs to work with target times rather than windows. NASA has developed a PDRC prototype system that integrates the Center's TMA system with a research prototype Tower decision support tool. A two-phase field evaluation was conducted at NASA's North Texas Research Station in Dallas/Fort Worth. The field evaluation validated the PDRC concept and demonstrated reduced release time uncertainty while being used for tactical departure scheduling of more than 230 operational flights over 29 weeks of operations. This paper presents research results from the PDRC research activity. Companion papers present the Concept of Operations and a Technology Description.

  5. Precision Departure Release Capability (PDRC) Technology Description

    NASA Technical Reports Server (NTRS)

    Engelland, Shawn A.; Capps, Richard; Day, Kevin; Robinson, Corissia; Null, Jody R.

    2013-01-01

    After takeoff, aircraft must merge into en route (Center) airspace traffic flows which may be subject to constraints that create localized demand-capacity imbalances. When demand exceeds capacity, Traffic Management Coordinators (TMCs) often use tactical departure scheduling to manage the flow of departures into the constrained Center traffic flow. Tactical departure scheduling usually involves use of a Call for Release (CFR) procedure wherein the Tower must call the Center TMC to coordinate a release time prior to allowing the flight to depart. In present-day operations release times are computed by the Center Traffic Management Advisor (TMA) decision support tool based upon manual estimates of aircraft ready time verbally communicated from the Tower to the Center. The TMA-computed release is verbally communicated from the Center back to the Tower where it is relayed to the Local controller as a release window that is typically three minutes wide. The Local controller will manage the departure to meet the coordinated release time window. Manual ready time prediction and verbal release time coordination are labor intensive and prone to inaccuracy. Also, use of release time windows adds uncertainty to the tactical departure process. Analysis of more than one million flights from January 2011 indicates that a significant number of tactically scheduled aircraft missed their en route slot due to ready time prediction uncertainty. Uncertainty in ready time estimates may result in missed opportunities to merge into constrained en route flows and lead to lost throughput. Next Generation Air Transportation System (NextGen) plans call for development of Tower automation systems capable of computing surface trajectory-based ready time estimates. NASA has developed the Precision Departure Release Capability (PDRC) concept that uses this technology to improve tactical departure scheduling by automatically communicating surface trajectory-based ready time predictions to the Center scheduling tool. The PDRC concept also incorporates earlier NASA and FAA research into automation-assisted CFR coordination. The PDRC concept helps reduce uncertainty by automatically communicating coordinated release times with seconds-level precision enabling TMCs to work with target times rather than windows. NASA has developed a PDRC prototype system that integrates the Center's TMA system with a research prototype Tower decision support tool. A two-phase field evaluation was conducted at NASA's North Texas Research Station (NTX) in Dallas-Fort Worth. The field evaluation validated the PDRC concept and demonstrated reduced release time uncertainty while being used for tactical departure scheduling of more than 230 operational flights over 29 weeks of operations. This paper presents the Technology Description. Companion papers include the Final Report and a Concept of Operations.

  6. KSC-2013-2925

    NASA Image and Video Library

    2013-06-27

    CAPE CANAVERAL, Fla. – Inside the Operations and Checkout Building high bay at NASA’s Kennedy Space Center in Florida, members of the media receive an on activities in NASA’s Ground Systems Development and Operations, or GSDO, Program, Space Launch System and Orion crew module for Exploration Test Flight 1. Speaking to the media is Larry Price, Lockheed Martin deputy program manager for Orion. In the background, from left are Scott Wilson, manager of Orion Production Operations at Kennedy Jeremy Parsons, chief of the GSDO Operations Integration Office at Kennedy Tom Erdman, from Marshall Space Flight Center’s Kennedy resident office and Jules Schneider, Lockheed Martin manager of Orion Production Operations. Orion is the exploration spacecraft designed to carry crews to space beyond low Earth orbit. It will provide emergency abort capability, sustain the crew during the space travel and provide safe re-entry from deep space return velocities. Orion’s first unpiloted test flight is scheduled to launch in 2014 atop a Delta IV rocket. A second uncrewed flight test is scheduled for 2017 on NASA’s Space Launch System rocket. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Jim Grossmann

  7. DARK Technology Transition Plan

    DTIC Science & Technology

    1990-04-01

    or suspend/resume primitives , and bounded delays. Under the above circumstances, the extra language features, and the hidden system calls they... system , this implies that the mechanisms by which units interact - to synchronise , communicate, schedule one another, or alert one another - should be...the Kernel environment are: " The host system is a DEC VAX operating under VMS 5.0 (the specific host used at the SEI is a MicroVAX II operating under

  8. Satellite services system analysis study. Volume 5: Programmatics

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The overall program and resources needed for development and operation of a Satellite Services System is reviewed. Program requirements covered system operations through 1993 and were completed in preliminary form. Program requirements were refined based on equipment preliminary design and analysis. Schedules, costs, equipment utilization, and facility/advanced technology requirements were included in the update. Equipment user charges were developed for each piece of equipment and for representative satellite servicing missions.

  9. The Management of Defense System and Equipment Training: A Guide for the Naval Education and Training Command

    DTIC Science & Technology

    1977-07-01

    SYSTEM EVOLUTION 4- LEVEL 1 LEVEL 2 LEVEL 3 ,_J LEVEL 4 PERSONNEL ENTRY FACTORS (SKILL, KNOWLEDGE, EXPERIENCE ) HIGH HIGH AND ABOVE...system) and their associated program characteristics (cost, schedules, and operational parameters) based on a combination of analyses, experiments , and...Naval Operations Appropriations (blue doll ars) Appropriation Abbreviation Sponsor Research, Development, Test and Evaluation, Navy RDT&EN ASN (R&D

  10. Information System for Educational Policy and Administration.

    ERIC Educational Resources Information Center

    Clayton, J. C., Jr.

    Educational Information System (EIS) is a proposed computer-based data processing system to help schools solve current educational problems more efficiently. The system would allow for more effective administrative operations in student scheduling, financial accounting, and long range planning. It would also assist school trustees and others in…

  11. 10 CFR 950.21 - Notification of covered event.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... event; (2) The duration of the delay in the schedule for construction, testing and full power operation... and full power operation, including the dates of system level construction or testing that had been... information is accurate and complete to the sponsor's knowledge and belief. ...

  12. Solar power satellite. System definition study. Part 1, volume 3: Construction, transportation and cost analyses

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Concepts developed for both LEO and GEO construction of photovoltaic and thermal engine satellites are analyzed. Topics discussed include: satellite construction; crew scheduling; crew jobs and organizations; operator productivity rating; constructability rating; transportation systems for cargo launch, refueling operations, personnel transport, and orbit transfer; collision analysis, cost analysis, and radiation evironment and effects.

  13. Missile Defense: Actions Needed to Improve Transparency and Accountability

    DTIC Science & Technology

    2011-04-13

    suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway...Established resource, schedule, test, operational capacity, technical, and contract baselines for several missile defense systems. It reported...Europe as well as the Ground-based Midcourse Defense system. View GAO-11-555T or key components. For more information, contact Cristina T

  14. Shuttle free-flying teleoperator system experiment definition. Volume 3: program development requirements

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The planning data are presented for subsequent phases of free-flying teleoperator program (FFTO) and includes costs, schedules and supporting research and technology activities required to implement the free-flying teleoperator system and associated flight equipment. The purpose of the data presented is to provide NASA with the information needed to continue development of the FFTO and integrate it into the space shuttle program. The planning data describes three major program phases consisting of activities and events scheduled to effect integrated design, development, fabrication and operation of an FFTO system. Phase A, Concept Generation, represents a study effort directed toward generating and evaluating a number of feasible FFTO experiment system concepts. Phase B, Definition, will include preliminary design and supporting analysis of the FFTO, the shuttle based equipment and ground support equipment. Phase C/D, Design, Development and Operations will include detail design of the operational FFTO, its integration into the space shuttle, hardware fabrication and testing, delivery of flight hardware and support of flight operations. Emphasis is placed on the planning for Phases A and B since these studies will be implemented early in the development cycle. Phase C/D planning is more general and subject to refinement during the definition phase.

  15. Can varying the number of teams in a shift schedule constitute a preventive strategy?

    PubMed

    Jeppesen, Hans Jeppe; Kleiven, Magnar; Bøggild, Henrik

    2004-12-01

    The study examines the implications for shiftworkers of applying different numbers of teams in the organization of shiftwork. The participating operators came from five different companies applying continuous shift rotation systems. The companies shared the same product organization and a common corporate culture belonging to the same multinational company. Each company had a shift system consisting of four, five or six teams, with the proportion of shifts outside day work decreasing as the number of teams increased. Questionnaire and documentary data were used as data sources. Operators in systems with additional teams had more daywork but also more irregular working hours due to both overtime and schedule changes. Operators using six teams used fewer social compensation strategies. Operators in four teams were most satisfied with their work hours. Satisfaction with the time available for various social activities outside work varied inconsistently between the groups. In rotating systems the application of more teams reduces the number of shifts outside day work. This apparent improvement for shiftworkers was counteracted by a concomitant irregularity produced by greater organizational requirements for flexibility. The balance of this interaction was found to have a critical impact on employees.

  16. Alleviating line overload by line switching

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, H.E.

    1988-01-01

    Traditionally, the method used by power system dispatchers to reduce or to eliminate line overload conditions has been to shift generation. Such shifts are generally in conflict with the carefully considered economic dispatch of generation. A proper generation schedule has taken into account many factors, such as generator limits, transmission penalties, incremental costs, var support, and system security. Any deviation from this schedule results in increased production cost. Recently, consideration has been given to alleviating line overloads by line switching. In many situations, line switching does not greatly change the transmission penalty factors and, therefore, can be undertaken without seriouslymore » affecting the economic dispatch. It would be convenient for system operators to have a fast, easy-to-operate computer and program available for the evaluation of the efficacy of a line removal (or addition) in dealing with an overload. It is imperative that the operator be properly advised, that a certain line switching reduces the overload and not aggravate the condition. After it has been determined that a line opening (or closing) produces the desired effect, the operator still must assess the consequence of such switching on system security before actually taking such action.« less

  17. A Generalized Timeline Representation, Services, and Interface for Automating Space Mission Operations

    NASA Technical Reports Server (NTRS)

    Chien, Steve A.; Johnston, Mark; Frank, Jeremy; Giuliano, Mark; Kavelaars, Alicia; Lenzen, Christoph; Policella, Nicola

    2012-01-01

    Numerous automated and semi-automated planning & scheduling systems have been developed for space applications. Most of these systems are model-based in that they encode domain knowledge necessary to predict spacecraft state and resources based on initial conditions and a proposed activity plan. The spacecraft state and resources as often modeled as a series of timelines, with a timeline or set of timelines to represent a state or resource key in the operations of the spacecraft. In this paper, we first describe a basic timeline representation that can represent a set of state, resource, timing, and transition constraints. We describe a number of planning and scheduling systems designed for space applications (and in many cases deployed for use of ongoing missions) and describe how they do and do not map onto this timeline model.

  18. Dynamic Voltage-Frequency and Workload Joint Scaling Power Management for Energy Harvesting Multi-Core WSN Node SoC

    PubMed Central

    Li, Xiangyu; Xie, Nijie; Tian, Xinyue

    2017-01-01

    This paper proposes a scheduling and power management solution for energy harvesting heterogeneous multi-core WSN node SoC such that the system continues to operate perennially and uses the harvested energy efficiently. The solution consists of a heterogeneous multi-core system oriented task scheduling algorithm and a low-complexity dynamic workload scaling and configuration optimization algorithm suitable for light-weight platforms. Moreover, considering the power consumption of most WSN applications have the characteristic of data dependent behavior, we introduce branches handling mechanism into the solution as well. The experimental result shows that the proposed algorithm can operate in real-time on a lightweight embedded processor (MSP430), and that it can make a system do more valuable works and make more than 99.9% use of the power budget. PMID:28208730

  19. Dynamic Voltage-Frequency and Workload Joint Scaling Power Management for Energy Harvesting Multi-Core WSN Node SoC.

    PubMed

    Li, Xiangyu; Xie, Nijie; Tian, Xinyue

    2017-02-08

    This paper proposes a scheduling and power management solution for energy harvesting heterogeneous multi-core WSN node SoC such that the system continues to operate perennially and uses the harvested energy efficiently. The solution consists of a heterogeneous multi-core system oriented task scheduling algorithm and a low-complexity dynamic workload scaling and configuration optimization algorithm suitable for light-weight platforms. Moreover, considering the power consumption of most WSN applications have the characteristic of data dependent behavior, we introduce branches handling mechanism into the solution as well. The experimental result shows that the proposed algorithm can operate in real-time on a lightweight embedded processor (MSP430), and that it can make a system do more valuable works and make more than 99.9% use of the power budget.

  20. A Comparison of Center/TRACON Automation System and Airline Time of Arrival Predictions

    NASA Technical Reports Server (NTRS)

    Heere, Karen R.; Zelenka, Richard E.

    2000-01-01

    Benefits from information sharing between an air traffic service provider and a major air carrier are evaluated. Aircraft arrival time schedules generated by the NASA/FAA Center/TRACON Automation System (CTAS) were provided to the American Airlines System Operations Control Center in Fort Worth, Texas, during a field trial of a specialized CTAS display. A statistical analysis indicates that the CTAS schedules, based on aircraft trajectories predicted from real-time radar and weather data, are substantially more accurate than the traditional airline arrival time estimates, constructed from flight plans and en route crew updates. The improvement offered by CTAS is especially advantageous during periods of heavy traffic and substantial terminal area delay, allowing the airline to avoid large predictive errors with serious impact on the efficiency and profitability of flight operations.

  1. Renaissance: A revolutionary approach for providing low-cost ground data systems

    NASA Technical Reports Server (NTRS)

    Butler, Madeline J.; Perkins, Dorothy C.; Zeigenfuss, Lawrence B.

    1996-01-01

    The NASA is changing its attention from large missions to a greater number of smaller missions with reduced development schedules and budgets. In relation to this, the Renaissance Mission Operations and Data Systems Directorate systems engineering process is presented. The aim of the Renaissance approach is to improve system performance, reduce cost and schedules and meet specific customer needs. The approach includes: the early involvement of the users to define the mission requirements and system architectures; the streamlining of management processes; the development of a flexible cost estimation capability, and the ability to insert technology. Renaissance-based systems demonstrate significant reuse of commercial off-the-shelf building blocks in an integrated system architecture.

  2. Highly automated on-orbit operations of the NuSTAR telescope

    NASA Astrophysics Data System (ADS)

    Roberts, Bryce; Bester, Manfred; Dumlao, Renee; Eckert, Marty; Johnson, Sam; Lewis, Mark; McDonald, John; Pease, Deron; Picard, Greg; Thorsness, Jeremy

    2014-08-01

    UC Berkeley's Space Sciences Laboratory (SSL) currently operates a fleet of seven NASA satellites, which conduct research in the fields of space physics and astronomy. The newest addition to this fleet is a high-energy X-ray telescope called the Nuclear Spectroscopic Telescope Array (NuSTAR). Since 2012, SSL has conducted on-orbit operations for NuSTAR on behalf of the lead institution, principle investigator, and Science Operations Center at the California Institute of Technology. NuSTAR operations benefit from a truly multi-mission ground system architecture design focused on automation and autonomy that has been honed by over a decade of continual improvement and ground network expansion. This architecture has made flight operations possible with nominal 40 hours per week staffing, while not compromising mission safety. The remote NuSTAR Science Operation Center (SOC) and Mission Operations Center (MOC) are joined by a two-way electronic interface that allows the SOC to submit automatically validated telescope pointing requests, and also to receive raw data products that are automatically produced after downlink. Command loads are built and uploaded weekly, and a web-based timeline allows both the SOC and MOC to monitor the state of currently scheduled spacecraft activities. Network routing and the command and control system are fully automated by MOC's central scheduling system. A closed-loop data accounting system automatically detects and retransmits data gaps. All passes are monitored by two independent paging systems, which alert staff of pass support problems or anomalous telemetry. NuSTAR mission operations now require less than one attended pass support per workday.

  3. Scheduling of an aircraft fleet

    NASA Technical Reports Server (NTRS)

    Paltrinieri, Massimo; Momigliano, Alberto; Torquati, Franco

    1992-01-01

    Scheduling is the task of assigning resources to operations. When the resources are mobile vehicles, they describe routes through the served stations. To emphasize such aspect, this problem is usually referred to as the routing problem. In particular, if vehicles are aircraft and stations are airports, the problem is known as aircraft routing. This paper describes the solution to such a problem developed in OMAR (Operative Management of Aircraft Routing), a system implemented by Bull HN for Alitalia. In our approach, aircraft routing is viewed as a Constraint Satisfaction Problem. The solving strategy combines network consistency and tree search techniques.

  4. Computer Based Decision Support Tool for Helicopter Mission Planning in Disaster Relief and Military Operations (Outil informatique d’aide a la decision pour la planification des missions d’helicopteres dans des operations militaires et de secours en cas de catastrophe)

    DTIC Science & Technology

    2008-06-01

    capacity planning; • Electrical generation capacity planning; • Machine scheduling; • Freight scheduling; • Dairy farm expansion planning...Support Systems and Multi Criteria Decision Analysis Products A.2.11.2.2.1 ELECTRE IS ELECTRE IS is a generalization of ELECTRE I. It is a...criteria, ELECTRE IS supports the user in the process of selecting one alternative or a subset of alternatives. The method consists of two parts

  5. Multiobjective optimisation design for enterprise system operation in the case of scheduling problem with deteriorating jobs

    NASA Astrophysics Data System (ADS)

    Wang, Hongfeng; Fu, Yaping; Huang, Min; Wang, Junwei

    2016-03-01

    The operation process design is one of the key issues in the manufacturing and service sectors. As a typical operation process, the scheduling with consideration of the deteriorating effect has been widely studied; however, the current literature only studied single function requirement and rarely considered the multiple function requirements which are critical for a real-world scheduling process. In this article, two function requirements are involved in the design of a scheduling process with consideration of the deteriorating effect and then formulated into two objectives of a mathematical programming model. A novel multiobjective evolutionary algorithm is proposed to solve this model with combination of three strategies, i.e. a multiple population scheme, a rule-based local search method and an elitist preserve strategy. To validate the proposed model and algorithm, a series of randomly-generated instances are tested and the experimental results indicate that the model is effective and the proposed algorithm can achieve the satisfactory performance which outperforms the other state-of-the-art multiobjective evolutionary algorithms, such as nondominated sorting genetic algorithm II and multiobjective evolutionary algorithm based on decomposition, on all the test instances.

  6. Autonomously generating operations sequences for a Mars Rover using AI-based planning

    NASA Technical Reports Server (NTRS)

    Sherwood, Rob; Mishkin, Andrew; Estlin, Tara; Chien, Steve; Backes, Paul; Cooper, Brian; Maxwell, Scott; Rabideau, Gregg

    2001-01-01

    This paper discusses a proof-of-concept prototype for ground-based automatic generation of validated rover command sequences from highlevel science and engineering activities. This prototype is based on ASPEN, the Automated Scheduling and Planning Environment. This Artificial Intelligence (AI) based planning and scheduling system will automatically generate a command sequence that will execute within resource constraints and satisfy flight rules.

  7. Software For Integer Programming

    NASA Technical Reports Server (NTRS)

    Fogle, F. R.

    1992-01-01

    Improved Exploratory Search Technique for Pure Integer Linear Programming Problems (IESIP) program optimizes objective function of variables subject to confining functions or constraints, using discrete optimization or integer programming. Enables rapid solution of problems up to 10 variables in size. Integer programming required for accuracy in modeling systems containing small number of components, distribution of goods, scheduling operations on machine tools, and scheduling production in general. Written in Borland's TURBO Pascal.

  8. Design of a universal logic block for fault-tolerant realization of any logic operation in trapped-ion quantum circuits

    NASA Astrophysics Data System (ADS)

    Goudarzi, H.; Dousti, M. J.; Shafaei, A.; Pedram, M.

    2014-05-01

    This paper presents a physical mapping tool for quantum circuits, which generates the optimal universal logic block (ULB) that can, on average, perform any logical fault-tolerant (FT) quantum operations with the minimum latency. The operation scheduling, placement, and qubit routing problems tackled by the quantum physical mapper are highly dependent on one another. More precisely, the scheduling solution affects the quality of the achievable placement solution due to resource pressures that may be created as a result of operation scheduling, whereas the operation placement and qubit routing solutions influence the scheduling solution due to resulting distances between predecessor and current operations, which in turn determines routing latencies. The proposed flow for the quantum physical mapper captures these dependencies by applying (1) a loose scheduling step, which transforms an initial quantum data flow graph into one that explicitly captures the no-cloning theorem of the quantum computing and then performs instruction scheduling based on a modified force-directed scheduling approach to minimize the resource contention and quantum circuit latency, (2) a placement step, which uses timing-driven instruction placement to minimize the approximate routing latencies while making iterative calls to the aforesaid force-directed scheduler to correct scheduling levels of quantum operations as needed, and (3) a routing step that finds dynamic values of routing latencies for the qubits. In addition to the quantum physical mapper, an approach is presented to determine the single best ULB size for a target quantum circuit by examining the latency of different FT quantum operations mapped onto different ULB sizes and using information about the occurrence frequency of operations on critical paths of the target quantum algorithm to weigh these latencies. Experimental results show an average latency reduction of about 40 % compared to previous work.

  9. Simulation based energy-resource efficient manufacturing integrated with in-process virtual management

    NASA Astrophysics Data System (ADS)

    Katchasuwanmanee, Kanet; Cheng, Kai; Bateman, Richard

    2016-09-01

    As energy efficiency is one of the key essentials towards sustainability, the development of an energy-resource efficient manufacturing system is among the great challenges facing the current industry. Meanwhile, the availability of advanced technological innovation has created more complex manufacturing systems that involve a large variety of processes and machines serving different functions. To extend the limited knowledge on energy-efficient scheduling, the research presented in this paper attempts to model the production schedule at an operation process by considering the balance of energy consumption reduction in production, production work flow (productivity) and quality. An innovative systematic approach to manufacturing energy-resource efficiency is proposed with the virtual simulation as a predictive modelling enabler, which provides real-time manufacturing monitoring, virtual displays and decision-makings and consequentially an analytical and multidimensional correlation analysis on interdependent relationships among energy consumption, work flow and quality errors. The regression analysis results demonstrate positive relationships between the work flow and quality errors and the work flow and energy consumption. When production scheduling is controlled through optimization of work flow, quality errors and overall energy consumption, the energy-resource efficiency can be achieved in the production. Together, this proposed multidimensional modelling and analysis approach provides optimal conditions for the production scheduling at the manufacturing system by taking account of production quality, energy consumption and resource efficiency, which can lead to the key competitive advantages and sustainability of the system operations in the industry.

  10. Intelligent Planning and Scheduling for Controlled Life Support Systems

    NASA Technical Reports Server (NTRS)

    Leon, V. Jorge

    1996-01-01

    Planning in Controlled Ecological Life Support Systems (CELSS) requires special look ahead capabilities due to the complex and long-term dynamic behavior of biological systems. This project characterizes the behavior of CELSS, identifies the requirements of intelligent planning systems for CELSS, proposes the decomposition of the planning task into short-term and long-term planning, and studies the crop scheduling problem as an initial approach to long-term planning. CELSS is studied in the realm of Chaos. The amount of biomass in the system is modeled using a bounded quadratic iterator. The results suggests that closed ecological systems can exhibit periodic behavior when imposed external or artificial control. The main characteristics of CELSS from the planning and scheduling perspective are discussed and requirements for planning systems are given. Crop scheduling problem is identified as an important component of the required long-term lookahead capabilities of a CELSS planner. The main characteristics of crop scheduling are described and a model is proposed to represent the problem. A surrogate measure of the probability of survival is developed. The measure reflects the absolute deviation of the vital reservoir levels from their nominal values. The solution space is generated using a probability distribution which captures both knowledge about the system and the current state of affairs at each decision epoch. This probability distribution is used in the context of an evolution paradigm. The concepts developed serve as the basis for the development of a simple crop scheduling tool which is used to demonstrate its usefulness in the design and operation of CELSS.

  11. Scheduling algorithm for data relay satellite optical communication based on artificial intelligent optimization

    NASA Astrophysics Data System (ADS)

    Zhao, Wei-hu; Zhao, Jing; Zhao, Shang-hong; Li, Yong-jun; Wang, Xiang; Dong, Yi; Dong, Chen

    2013-08-01

    Optical satellite communication with the advantages of broadband, large capacity and low power consuming broke the bottleneck of the traditional microwave satellite communication. The formation of the Space-based Information System with the technology of high performance optical inter-satellite communication and the realization of global seamless coverage and mobile terminal accessing are the necessary trend of the development of optical satellite communication. Considering the resources, missions and restraints of Data Relay Satellite Optical Communication System, a model of optical communication resources scheduling is established and a scheduling algorithm based on artificial intelligent optimization is put forwarded. According to the multi-relay-satellite, multi-user-satellite, multi-optical-antenna and multi-mission with several priority weights, the resources are scheduled reasonable by the operation: "Ascertain Current Mission Scheduling Time" and "Refresh Latter Mission Time-Window". The priority weight is considered as the parameter of the fitness function and the scheduling project is optimized by the Genetic Algorithm. The simulation scenarios including 3 relay satellites with 6 optical antennas, 12 user satellites and 30 missions, the simulation result reveals that the algorithm obtain satisfactory results in both efficiency and performance and resources scheduling model and the optimization algorithm are suitable in multi-relay-satellite, multi-user-satellite, and multi-optical-antenna recourses scheduling problem.

  12. 76 FR 10086 - Notice of Application for Approval of Discontinuance or Modification of a Railroad Signal System

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-23

    ... automatic signals as well as the circuit controllers from five hand-operated switches and one hand-operated crossover. The hand-operated switches will remain in the application area without signal protection. The... submitting written views, data, or comments. FRA does not anticipate scheduling a public hearing in...

  13. Spot and Runway Departure Advisor

    NASA Technical Reports Server (NTRS)

    Jung, Yoon Chul

    2013-01-01

    The Spot and Runway Departure Advisor (SARDA) is a research prototype of a decision support tool for ATC tower controllers to assist in manging and controlling traffic on the surface of an airport. SARDA employs a scheduler to generate an optimal runway schedule and gate push-back - spot release sequence and schedule that improves efficiency of surface operations. The advisories for ATC tower controllers are displayed on an Electronic Flight Strip (EFS) system. The human-in-the-loop simulation of the SARDA tool was conducted for east operations of Dallas-Ft. Worth International Airport (DFW) to evaluate performance of the SARDA tool and human factors, such as situational awareness and workload. The results indicates noticeable taxi delay reduction and fuel savings by using the SARDA tool. Reduction in controller workload were also observed throughout the scenario runs. The future plan includes modeling and simulation of the ramp operations of the Charlotte International Airport, and develop a decision support tool for the ramp controllers.

  14. Study of onboard expert systems to augment space shuttle and space station autonomy

    NASA Technical Reports Server (NTRS)

    Kurtzman, C. R.; Akin, D. L.; Kranzler, D.; Erlanson, E.

    1986-01-01

    The feasibility of onboard crew activity planning was examined. The use of expert systems technology to aid crewmembers in locating stowed equipment was also investigated. The crew activity planning problem, along with a summary of past and current research efforts, was discussed in detail. The requirements and specifications used to develop the crew activity planning system was also defined. The guidelines used to create, develop, and operate the MFIVE Crew Scheduler and Logistics Clerk were discussed. Also discussed is the mathematical algorithm, used by the MFIVE Scheduler, which was developed to aid in optimal crew activity planning.

  15. Surgical scheduling categorization system (SSCS): A novel classification system to improve coordination and scheduling of operative cases in a tertiary pediatric medical system.

    PubMed

    Gantwerker, Eric A; Bannos, Cassandra; Cunningham, Michael J; Rahbar, Reza

    2017-01-01

    To describe a surgical categorization system to create a universal nomenclature, delineating patient complexity as a first step toward developing a true risk stratification system. Retrospective database review of all otolaryngology surgical procedures performed in a tertiary pediatric hospital system over one academic year (July 2012-June 2013). All otolaryngology surgical procedures were reviewed, encompassing 8478 procedures on 5711 patients. The attending otolaryngologist assigned surgical scheduling category (SSCS) at the time of case booking based on an institution specific guidelines. The guidelines are as follow: Category I was assigned to American Society of Anesthesiologists physical status classification (ASA) I/II patients, designating them appropriate for institution's suburban ambulatory surgery centers; Category II was ASA I/II patients with social or transportation issues; Category III was ASA I/II patients who required case coordination with other medical or surgical departments; Category IV was reserved for patients of any ASA class whom the surgeon designated to be of a higher complexity. 8478 total procedures analyzed with 7198 having complete records. 48% were Category I, 13.6% were Category II, 1.9% were Category III and 36.5% were Category IV. The ASA were 34.7% ASA I, 50% ASA II, 13.39% ASA III, and 1.9% ASA IV. Although the largest proportion of patients were ASA II (50%), 39.6% of all ASA II were Category IV. Category IV was split into 54.2% ASA II and 34% ASA III and shows that peri-operative surgical concerns were not encompassed by the ASA system. This surgical categorization system streamlines surgical scheduling in a tertiary pediatric hospital system, particularly with respect to the designation of cases as ambulatory surgery center or main operating room appropriate. The case mix complexity is also readily apparent, enhancing recognition of the coordination and attention required for the perioperative management of high complexity patients. The SSCS helps convey concerns not addressed by ASA physical status alone. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  16. Transformation reborn: A new generation expert system for planning HST operations

    NASA Technical Reports Server (NTRS)

    Gerb, Andrew

    1991-01-01

    The Transformation expert system (TRANS) converts proposals for astronomical observations with the Hubble Space Telescope (HST) into detailed observing plans. It encodes expert knowledge to solve problems faced in planning and commanding HST observations to enable their processing by the Science Operations Ground System (SOGS). Among these problems are determining an acceptable order of executing observations, grouping of observations to enhance efficiency and schedulability, inserting extra observations when necessary, and providing parameters for commanding HST instruments. TRANS is currently an operational system and plays a critical role in the HST ground system. It was originally designed using forward-chaining provided by the OPS5 expert system language, but has been reimplemented using a procedural knowledge base. This reimplementation was forced by the explosion in the amount of OPS5 code required to specify the increasingly complicated situations requiring expert-level intervention by the TRANS knowledge base. This problem was compounded by the difficulty of avoiding unintended interaction between rules. To support the TRANS knowledge base, XCL, a small but powerful extension to Commom Lisp was implemented. XCL allows a compact syntax for specifying assignments and references to object attributes. XCL also allows the capability to iterate over objects and perform keyed lookup. The reimplementation of TRANS has greatly diminished the effort needed to maintain and enhance it. As a result of this, its functions have been expanded to include warnings about observations that are difficult or impossible to schedule or command, providing data to aid SPIKE, an intelligent planning system used for HST long-term scheduling, and providing information to the Guide Star Selection System (GSSS) to aid in determination of the long range availability of guide stars.

  17. Design Considerations for a New Terminal Area Arrival Scheduler

    NASA Technical Reports Server (NTRS)

    Thipphavong, Jane; Mulfinger, Daniel

    2010-01-01

    Design of a terminal area arrival scheduler depends on the interrelationship between throughput, delay and controller intervention. The main contribution of this paper is an analysis of the above interdependence for several stochastic behaviors of expected system performance distributions in the aircraft s time of arrival at the meter fix and runway. Results of this analysis serve to guide the scheduler design choices for key control variables. Two types of variables are analyzed, separation buffers and terminal delay margins. The choice for these decision variables was tested using sensitivity analysis. Analysis suggests that it is best to set the separation buffer at the meter fix to its minimum and adjust the runway buffer to attain the desired system performance. Delay margin was found to have the least effect. These results help characterize the variables most influential in the scheduling operations of terminal area arrivals.

  18. 40 CFR 58.12 - Operating schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.12 Operating schedules. State and local... part. Area-specific PAMS operating schedules must be included as part of the PAMS network description... remains once every six days. No less frequently than as part of each 5-year network assessment, the most...

  19. 40 CFR 58.12 - Operating schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.12 Operating schedules. State and local... part. Area-specific PAMS operating schedules must be included as part of the PAMS network description... remains once every six days. No less frequently than as part of each 5-year network assessment, the most...

  20. The use of patient factors to improve the prediction of operative duration using laparoscopic cholecystectomy.

    PubMed

    Thiels, Cornelius A; Yu, Denny; Abdelrahman, Amro M; Habermann, Elizabeth B; Hallbeck, Susan; Pasupathy, Kalyan S; Bingener, Juliane

    2017-01-01

    Reliable prediction of operative duration is essential for improving patient and care team satisfaction, optimizing resource utilization and reducing cost. Current operative scheduling systems are unreliable and contribute to costly over- and underestimation of operative time. We hypothesized that the inclusion of patient-specific factors would improve the accuracy in predicting operative duration. We reviewed all elective laparoscopic cholecystectomies performed at a single institution between 01/2007 and 06/2013. Concurrent procedures were excluded. Univariate analysis evaluated the effect of age, gender, BMI, ASA, laboratory values, smoking, and comorbidities on operative duration. Multivariable linear regression models were constructed using the significant factors (p < 0.05). The patient factors model was compared to the traditional surgical scheduling system estimates, which uses historical surgeon-specific and procedure-specific operative duration. External validation was done using the ACS-NSQIP database (n = 11,842). A total of 1801 laparoscopic cholecystectomy patients met inclusion criteria. Female sex was associated with reduced operative duration (-7.5 min, p < 0.001 vs. male sex) while increasing BMI (+5.1 min BMI 25-29.9, +6.9 min BMI 30-34.9, +10.4 min BMI 35-39.9, +17.0 min BMI 40 + , all p < 0.05 vs. normal BMI), increasing ASA (+7.4 min ASA III, +38.3 min ASA IV, all p < 0.01 vs. ASA I), and elevated liver function tests (+7.9 min, p < 0.01 vs. normal) were predictive of increased operative duration on univariate analysis. A model was then constructed using these predictive factors. The traditional surgical scheduling system was poorly predictive of actual operative duration (R 2  = 0.001) compared to the patient factors model (R 2  = 0.08). The model remained predictive on external validation (R 2  = 0.14).The addition of surgeon as a variable in the institutional model further improved predictive ability of the model (R 2  = 0.18). The use of routinely available pre-operative patient factors improves the prediction of operative duration during cholecystectomy.

  1. Tiled architecture of a CNN-mostly IP system

    NASA Astrophysics Data System (ADS)

    Spaanenburg, Lambert; Malki, Suleyman

    2009-05-01

    Multi-core architectures have been popularized with the advent of the IBM CELL. On a finer grain the problems in scheduling multi-cores have already existed in the tiled architectures, such as the EPIC and Da Vinci. It is not easy to evaluate the performance of a schedule on such architecture as historical data are not available. One solution is to compile algorithms for which an optimal schedule is known by analysis. A typical example is an algorithm that is already defined in terms of many collaborating simple nodes, such as a Cellular Neural Network (CNN). A simple node with a local register stack together with a 'rotating wheel' internal communication mechanism has been proposed. Though the basic CNN allows for a tiled implementation of a tiled algorithm on a tiled structure, a practical CNN system will have to disturb this regularity by the additional need for arithmetical and logical operations. Arithmetic operations are needed for instance to accommodate for low-level image processing, while logical operations are needed to fork and merge different data streams without use of the external memory. It is found that the 'rotating wheel' internal communication mechanism still handles such mechanisms without the need for global control. Overall the CNN system provides for a practical network size as implemented on a FPGA, can be easily used as embedded IP and provides a clear benchmark for a multi-core compiler.

  2. Secure Autonomous Automated Scheduling (SAAS). Rev. 1.1

    NASA Technical Reports Server (NTRS)

    Walke, Jon G.; Dikeman, Larry; Sage, Stephen P.; Miller, Eric M.

    2010-01-01

    This report describes network-centric operations, where a virtual mission operations center autonomously receives sensor triggers, and schedules space and ground assets using Internet-based technologies and service-oriented architectures. For proof-of-concept purposes, sensor triggers are received from the United States Geological Survey (USGS) to determine targets for space-based sensors. The Surrey Satellite Technology Limited (SSTL) Disaster Monitoring Constellation satellite, the UK-DMC, is used as the space-based sensor. The UK-DMC's availability is determined via machine-to-machine communications using SSTL's mission planning system. Access to/from the UK-DMC for tasking and sensor data is via SSTL's and Universal Space Network's (USN) ground assets. The availability and scheduling of USN's assets can also be performed autonomously via machine-to-machine communications. All communication, both on the ground and between ground and space, uses open Internet standards

  3. Operation and Maintenance Resources for Small Drinking Water Systems

    EPA Pesticide Factsheets

    These documents and tools provide information on identifying treatment technologies that remove multiple contaminants, schedules for maintenance tasks and checklists, and logs for easily recording findings.

  4. 14 CFR 375.50 - Transit flights; scheduled international air service operations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... WITHIN THE UNITED STATES Transit Flights § 375.50 Transit flights; scheduled international air service operations. (a) Requirement of notice. Scheduled international air services proposed to be operated pursuant to the International Air Services Transit Agreement in transit across the United States may not be...

  5. 14 CFR 375.50 - Transit flights; scheduled international air service operations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... WITHIN THE UNITED STATES Transit Flights § 375.50 Transit flights; scheduled international air service operations. (a) Requirement of notice. Scheduled international air services proposed to be operated pursuant to the International Air Services Transit Agreement in transit across the United States may not be...

  6. 14 CFR 375.50 - Transit flights; scheduled international air service operations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... WITHIN THE UNITED STATES Transit Flights § 375.50 Transit flights; scheduled international air service operations. (a) Requirement of notice. Scheduled international air services proposed to be operated pursuant to the International Air Services Transit Agreement in transit across the United States may not be...

  7. 14 CFR 375.50 - Transit flights; scheduled international air service operations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... WITHIN THE UNITED STATES Transit Flights § 375.50 Transit flights; scheduled international air service operations. (a) Requirement of notice. Scheduled international air services proposed to be operated pursuant to the International Air Services Transit Agreement in transit across the United States may not be...

  8. 14 CFR 375.50 - Transit flights; scheduled international air service operations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... WITHIN THE UNITED STATES Transit Flights § 375.50 Transit flights; scheduled international air service operations. (a) Requirement of notice. Scheduled international air services proposed to be operated pursuant to the International Air Services Transit Agreement in transit across the United States may not be...

  9. 9 CFR 307.4 - Schedule of operations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... inspectors shall not, except as provided herein, occur prior to 4 hours after the beginning of scheduled... efficient and effective use of inspection personnel. The work schedule must specify daily clock hours of... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Schedule of operations. 307.4 Section...

  10. Automated Long - Term Scheduling for the SOFIA Airborne Observatory

    NASA Technical Reports Server (NTRS)

    Civeit, Thomas

    2013-01-01

    The NASA Stratospheric Observatory for Infrared Astronomy (SOFIA) is a joint US/German project to develop and operate a gyro-stabilized 2.5-meter telescope in a Boeing 747SP. SOFIA's first science observations were made in December 2010. During 2011, SOFIA accomplished 30 flights in the "Early Science" program as well as a deployment to Germany. The new observing period, known as Cycle 1, is scheduled to begin in 2012. It includes 46 science flights grouped in four multi-week observing campaigns spread through a 13-month span. Automation of the flight scheduling process offers a major challenge to the SOFIA mission operations. First because it is needed to mitigate its relatively high cost per unit observing time compared to space-borne missions. Second because automated scheduling techniques available for ground-based and space-based telescopes are inappropriate for an airborne observatory. Although serious attempts have been made in the past to solve part of the problem, until recently mission operations staff was still manually scheduling flights. We present in this paper a new automated solution for generating SOFIA long-term schedules that will be used in operations from the Cycle 1 observing period. We describe the constraints that should be satisfied to solve the SOFIA scheduling problem in the context of real operations. We establish key formulas required to efficiently calculate the aircraft course over ground when evaluating flight schedules. We describe the foundations of the SOFIA long-term scheduler, the constraint representation, and the random search based algorithm that generates observation and instrument schedules. Finally, we report on how the new long-term scheduler has been used in operations to date.

  11. Job expansion : an additional benefit of a computer aided dispatch/automatic vehicle locator (CAD/AVL) system

    DOT National Transportation Integrated Search

    2000-03-01

    The Denver Regional Transportation District (RTD) acquired a CAD/AVL system that became fully operational in 1996. The CAD/AVL system added radio channels and covert alarms in buses, located vehicles in real time, and monitored schedule adherence. Th...

  12. Applying the TOC Project Management to Operation and Maintenance Scheduling of a Research Vessel

    NASA Astrophysics Data System (ADS)

    Manti, M. Firdausi; Fujimoto, Hideo; Chen, Lian-Yi

    Marine research vessels and their systems are major assets in the marine resources development. Since the running costs for the ship are very high, it is necessary to reduce the total cost by an efficient scheduling for operation and maintenance. To reduce project period and make it efficient, we applied TOC project management method that is a project management approach developed by Dr. Eli Goldratt. It challenges traditional approaches to project management. It will become the most important improvement in the project management since the development of PERT and critical path methodologies. As a case study, we presented the marine geology research project for the purpose of operations in addition to repair on the repairing dock projects for maintenance of vessels.

  13. ATD-2 IADS Metroplex Traffic Management Overview Brief

    NASA Technical Reports Server (NTRS)

    Engelland, Shawn

    2016-01-01

    ATD-2 will improve the predictability and the operational efficiency of the air traffic system in metroplex environments through the enhancement, development and integration of the nation's most advanced and sophisticated arrival, departure, and surface prediction, scheduling and management systems.

  14. Cost, Schedule, And Performance Elements For Comparison of Hydrodynamic Models of Near-Surface Unmanned Underwater Vehicle Operations

    DTIC Science & Technology

    2017-12-01

    2-89) Prescribed by ANSI Std. 239-18 ii THIS PAGE INTENTIONALLY LEFT BLANK iii Approved for public release. Distribution is unlimited. COST ...from the scope of this demonstration due to time constraints. Further study of this software would benefit similar cost , schedule, and performance...NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA SYSTEMS ENGINEERING CAPSTONE PROJECT REPORT Approved for public release. Distribution

  15. Interactive experimenters' planning procedures and mission control

    NASA Technical Reports Server (NTRS)

    Desjardins, R. L.

    1973-01-01

    The computerized mission control and planning system routinely generates a 24-hour schedule in one hour of operator time by including time dimensions into experimental planning procedures. Planning is validated interactively as it is being generated segment by segment in the frame of specific event times. The planner simply points a light pen at the time mark of interest on the time line for entering specific event times into the schedule.

  16. From Fob to Noc: A Pathway to a Cyber Career for Combat Veterans

    DTIC Science & Technology

    2014-06-01

    Assurance Certifications GS general schedule HSAC Homeland Security Advisory Council IDS intrusion detection system IP internet protocol IPS...NIPRNET non-secure internet protocol router network NIST National Institute for Standards and Technology NOC network operations center NSA National...twice a day on an irregular schedule or during contact with the enemy to keep any observing enemy wary of the force protection 13 condition at any

  17. Resource Management in Constrained Dynamic Situations

    NASA Astrophysics Data System (ADS)

    Seok, Jinwoo

    Resource management is considered in this dissertation for systems with limited resources, possibly combined with other system constraints, in unpredictably dynamic environments. Resources may represent fuel, power, capabilities, energy, and so on. Resource management is important for many practical systems; usually, resources are limited, and their use must be optimized. Furthermore, systems are often constrained, and constraints must be satisfied for safe operation. Simplistic resource management can result in poor use of resources and failure of the system. Furthermore, many real-world situations involve dynamic environments. Many traditional problems are formulated based on the assumptions of given probabilities or perfect knowledge of future events. However, in many cases, the future is completely unknown, and information on or probabilities about future events are not available. In other words, we operate in unpredictably dynamic situations. Thus, a method is needed to handle dynamic situations without knowledge of the future, but few formal methods have been developed to address them. Thus, the goal is to design resource management methods for constrained systems, with limited resources, in unpredictably dynamic environments. To this end, resource management is organized hierarchically into two levels: 1) planning, and 2) control. In the planning level, the set of tasks to be performed is scheduled based on limited resources to maximize resource usage in unpredictably dynamic environments. In the control level, the system controller is designed to follow the schedule by considering all the system constraints for safe and efficient operation. Consequently, this dissertation is mainly divided into two parts: 1) planning level design, based on finite state machines, and 2) control level methods, based on model predictive control. We define a recomposable restricted finite state machine to handle limited resource situations and unpredictably dynamic environments for the planning level. To obtain a policy, dynamic programing is applied, and to obtain a solution, limited breadth-first search is applied to the recomposable restricted finite state machine. A multi-function phased array radar resource management problem and an unmanned aerial vehicle patrolling problem are treated using recomposable restricted finite state machines. Then, we use model predictive control for the control level, because it allows constraint handling and setpoint tracking for the schedule. An aircraft power system management problem is treated that aims to develop an integrated control system for an aircraft gas turbine engine and electrical power system using rate-based model predictive control. Our results indicate that at the planning level, limited breadth-first search for recomposable restricted finite state machines generates good scheduling solutions in limited resource situations and unpredictably dynamic environments. The importance of cooperation in the planning level is also verified. At the control level, a rate-based model predictive controller allows good schedule tracking and safe operations. The importance of considering the system constraints and interactions between the subsystems is indicated. For the best resource management in constrained dynamic situations, the planning level and the control level need to be considered together.

  18. Scheduling algorithms for automatic control systems for technological processes

    NASA Astrophysics Data System (ADS)

    Chernigovskiy, A. S.; Tsarev, R. Yu; Kapulin, D. V.

    2017-01-01

    Wide use of automatic process control systems and the usage of high-performance systems containing a number of computers (processors) give opportunities for creation of high-quality and fast production that increases competitiveness of an enterprise. Exact and fast calculations, control computation, and processing of the big data arrays - all of this requires the high level of productivity and, at the same time, minimum time of data handling and result receiving. In order to reach the best time, it is necessary not only to use computing resources optimally, but also to design and develop the software so that time gain will be maximal. For this purpose task (jobs or operations), scheduling techniques for the multi-machine/multiprocessor systems are applied. Some of basic task scheduling methods for the multi-machine process control systems are considered in this paper, their advantages and disadvantages come to light, and also some usage considerations, in case of the software for automatic process control systems developing, are made.

  19. EXODUS: Integrating intelligent systems for launch operations support

    NASA Technical Reports Server (NTRS)

    Adler, Richard M.; Cottman, Bruce H.

    1991-01-01

    Kennedy Space Center (KSC) is developing knowledge-based systems to automate critical operations functions for the space shuttle fleet. Intelligent systems will monitor vehicle and ground support subsystems for anomalies, assist in isolating and managing faults, and plan and schedule shuttle operations activities. These applications are being developed independently of one another, using different representation schemes, reasoning and control models, and hardware platforms. KSC has recently initiated the EXODUS project to integrate these stand alone applications into a unified, coordinated intelligent operations support system. EXODUS will be constructed using SOCIAL, a tool for developing distributed intelligent systems. EXODUS, SOCIAL, and initial prototyping efforts using SOCIAL to integrate and coordinate selected EXODUS applications are described.

  20. Dynamic Appliances Scheduling in Collaborative MicroGrids System

    PubMed Central

    Bilil, Hasnae; Aniba, Ghassane; Gharavi, Hamid

    2017-01-01

    In this paper a new approach which is based on a collaborative system of MicroGrids (MG’s), is proposed to enable household appliance scheduling. To achieve this, appliances are categorized into flexible and non-flexible Deferrable Loads (DL’s), according to their electrical components. We propose a dynamic scheduling algorithm where users can systematically manage the operation of their electric appliances. The main challenge is to develop a flattening function calculus (reshaping) for both flexible and non-flexible DL’s. In addition, implementation of the proposed algorithm would require dynamically analyzing two successive multi-objective optimization (MOO) problems. The first targets the activation schedule of non-flexible DL’s and the second deals with the power profiles of flexible DL’s. The MOO problems are resolved by using a fast and elitist multi-objective genetic algorithm (NSGA-II). Finally, in order to show the efficiency of the proposed approach, a case study of a collaborative system that consists of 40 MG’s registered in the load curve for the flattening program has been developed. The results verify that the load curve can indeed become very flat by applying the proposed scheduling approach. PMID:28824226

  1. Short-term hydro generation and interchange contract scheduling for Swiss Rail

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Christoforidis, M.; Awobamise, B.; Tong, S.

    This paper describes the Short-Term Resource Scheduling (STRS) function that has been developed by Siemens-Empros as part of the new SBB/Direktion Kraftwerk (Swiss Rail) Energy Management System. Optimal scheduling of the single-phase hydro plants, single-phase and three-phase energy accounts, and purchase and sale of three phase energy subject to a multitude of physical and contractual constraints (including spinning and regulating reserve requirements), is the main objective of the STRS function. The operations planning horizon of STRS is one day to one week using an hourly time increment.

  2. Telerobotic workstation design aid

    NASA Technical Reports Server (NTRS)

    Corker, K.; Hudlicka, E.; Young, D.; Cramer, N.

    1989-01-01

    Telerobot systems are being developed to support a number of space mission applications. In low earth orbit, telerobots and teleoperated manipulators will be used in shuttle operations and space station construction/maintenance. Free flying telerobotic service vehicles will be used at low and geosynchronous orbital operations. Rovers and autonomous vehicles will be equipped with telerobotic devices in planetary exploration. In all of these systems, human operators will interact with the robot system at varied levels during the scheduled operations. The human operators may be in either orbital or ground-based control systems. To assure integrated system development and maximum utility across these systems, designers must be sensitive to the constraints and capabilities that the human brings to system operation and must be assisted in applying these human factors to system development. The simulation and analysis system is intended to serve the needs of system analysis/designers as an integrated workstation in support of telerobotic design.

  3. Development and Preliminary Results of CTAS on Airline Operational Control Center Operations

    NASA Technical Reports Server (NTRS)

    Zelenka, Richard; Beatty, Roger; Falcone, Richard; Engelland, Shawn; Tobias, Leonard (Technical Monitor)

    1998-01-01

    Continued growth and expansion of air traffic and increased air carrier economic pressures have mandated greater flexibility and collaboration in air traffic management. The ability of airspace users to select their own routes, so called "free-flight", and to more actively manage their fleet operations for maximum economic advantage are receiving great attention. A first step toward greater airspace user and service provider collaboration is information sharing. In this work, arrival scheduling and airspace management data generated by the NASA/FAA Center/TRACON Automation System (CTAS) and used by the FAA service provider is shared with an airline with extensive operations within the CTAS operational domain. The design and development of a specialized airline CTAS "repeater" system is described, as well as some preliminary results of the impact and benefits of this information on the air carrier's operations. FAA controller per aircraft scheduling information, such as that provided by CTAS, has never before been shared in real-time with an airline. Expected airline benefits include improved fleet planning and arrival gate management, more informed "hold-go" decisions, and avoidance of costly aircraft diversions to alternate airports when faced with uncertain airborne arrival delays.

  4. Development and Preliminary Results of CTAS on Airline Operational Control Center Operations

    NASA Technical Reports Server (NTRS)

    Zelenka, Richard; Beatty, Roger; Engelland, Shawn

    2004-01-01

    Continued growth and expansion of air traffic and increased air carrier economic pressures have mandated greater flexibility and collaboration in air traffic management. The ability of airspace users to select their own routes, so called "free-flight", and to more actively manage their fleet operations for maximum economic advantage are receiving great attention. A first step toward greater airspace user and service provider collaboration is information sharing. In this work, arrival scheduling and airspace management data generated by the NASA/FAA Center/TRACON Automation System (CTAS) and used by the FAA service provider is shared with an airline with extensive operations within the CTAS operational domain. The design and development of a specialized airline CTAS "repeater" system is described, as well as some preliminary results of the impact and benefits of this information on the air carrier's operations. FAA controller per aircraft scheduling information, such as that provided by CTAS, has never before been shared in real-time with an airline. Expected airline benefits include improved fleet planning and arrival gate management, more informed "hold-go decisions, and avoidance of costly aircraft diversions to alternate airports when faced with uncertain airborne arrival delays.

  5. Multi-Objective Approach for Energy-Aware Workflow Scheduling in Cloud Computing Environments

    PubMed Central

    Kadima, Hubert; Granado, Bertrand

    2013-01-01

    We address the problem of scheduling workflow applications on heterogeneous computing systems like cloud computing infrastructures. In general, the cloud workflow scheduling is a complex optimization problem which requires considering different criteria so as to meet a large number of QoS (Quality of Service) requirements. Traditional research in workflow scheduling mainly focuses on the optimization constrained by time or cost without paying attention to energy consumption. The main contribution of this study is to propose a new approach for multi-objective workflow scheduling in clouds, and present the hybrid PSO algorithm to optimize the scheduling performance. Our method is based on the Dynamic Voltage and Frequency Scaling (DVFS) technique to minimize energy consumption. This technique allows processors to operate in different voltage supply levels by sacrificing clock frequencies. This multiple voltage involves a compromise between the quality of schedules and energy. Simulation results on synthetic and real-world scientific applications highlight the robust performance of the proposed approach. PMID:24319361

  6. Multi-objective approach for energy-aware workflow scheduling in cloud computing environments.

    PubMed

    Yassa, Sonia; Chelouah, Rachid; Kadima, Hubert; Granado, Bertrand

    2013-01-01

    We address the problem of scheduling workflow applications on heterogeneous computing systems like cloud computing infrastructures. In general, the cloud workflow scheduling is a complex optimization problem which requires considering different criteria so as to meet a large number of QoS (Quality of Service) requirements. Traditional research in workflow scheduling mainly focuses on the optimization constrained by time or cost without paying attention to energy consumption. The main contribution of this study is to propose a new approach for multi-objective workflow scheduling in clouds, and present the hybrid PSO algorithm to optimize the scheduling performance. Our method is based on the Dynamic Voltage and Frequency Scaling (DVFS) technique to minimize energy consumption. This technique allows processors to operate in different voltage supply levels by sacrificing clock frequencies. This multiple voltage involves a compromise between the quality of schedules and energy. Simulation results on synthetic and real-world scientific applications highlight the robust performance of the proposed approach.

  7. Increasing operating room productivity by duration categories and a newsvendor model.

    PubMed

    Lehtonen, Juha-Matti; Torkki, Paulus; Peltokorpi, Antti; Moilanen, Teemu

    2013-01-01

    Previous studies approach surgery scheduling mainly from the mathematical modeling perspective which is often hard to apply in a practical environment. The aim of this study is to develop a practical scheduling system that considers the advantages of both surgery categorization and newsvendor model to surgery scheduling. The research was carried out in a Finnish orthopaedic specialist centre that performs only joint replacement surgery. Four surgery categorization scenarios were defined and their productivity analyzed by simulation and newsvendor model. Detailed analyses of surgery durations and the use of more accurate case categories and their combinations in scheduling improved OR productivity 11.3 percent when compared to the base case. Planning to have one OR team to work longer led to remarkable decrease in scheduling inefficiency. In surgical services, productivity and cost-efficiency can be improved by utilizing historical data in case scheduling and by increasing flexibility in personnel management. The study increases the understanding of practical scheduling methods used to improve efficiency in surgical services.

  8. Future Air Traffic Growth and Schedule Model User's Guide

    NASA Technical Reports Server (NTRS)

    Kimmel, William M. (Technical Monitor); Smith, Jeremy C.; Dollyhigh, Samuel M.

    2004-01-01

    The Future Air Traffic Growth and Schedule Model was developed as an implementation of the Fratar algorithm to project future traffic flow between airports in a system and of then scheduling the additional flights to reflect current passenger time-of-travel preferences. The methodology produces an unconstrained future schedule from a current (or baseline) schedule and the airport operations growth rates. As an example of the use of the model, future schedules are projected for 2010 and 2022 for all flights arriving at, departing from, or flying between all continental United States airports that had commercial scheduled service for May 17, 2002. Inter-continental US traffic and airports are included and the traffic is also grown with the Fratar methodology to account for their arrivals and departures to the continental US airports. Input data sets derived from the Official Airline Guide (OAG) data and FAA Terminal Area Forecast (TAF) are included in the examples of the computer code execution.

  9. Assemby, test, and launch operations for the Mars Exploration Rovers

    NASA Technical Reports Server (NTRS)

    Wallace, Matthew T.; Hardy, Paul V.; Romero, Raul A.; Salvo, Christopher G.; Shain, Thomas W.; Thompson, Arthur D.; Wirth, John W.

    2005-01-01

    In January of 2004, NASA's twin Mars rovers, Spirit and Opportunity, successfully landed on opposite sides of the Red Planet after a seven month Earth to Mars cruise period. Both vehicles have operated well beyond their 90 day primary mission design life requirements. The Assembly, Test, and Launch Operations (ATLO) program for these missions presented unique technical and schedule challenges to the team at the Jet Propulsion Laboratory (JPL). Among these challenges were a highly compressed schedule and late deliveries leading to extended double shift staffing, dual spacecraft operations requiring test program diversification and resource arbitration, multiple atypical test configurations for airbag/rocket landings and surface mobility testing, and verification of an exceptionally large number of separations, deployments, and mechanisms. This paper discusses the flight system test philosophies and approach, and presents lessons learned.

  10. SOSS User Guide

    NASA Technical Reports Server (NTRS)

    Zhu, Zhifan; Gridnev, Sergei; Windhorst, Robert D.

    2015-01-01

    This User Guide describes SOSS (Surface Operations Simulator and Scheduler) software build and graphic user interface. SOSS is a desktop application that simulates airport surface operations in fast time using traffic management algorithms. It moves aircraft on the airport surface based on information provided by scheduling algorithm prototypes, monitors separation violation and scheduling conformance, and produces scheduling algorithm performance data.

  11. Supporting Real-Time Operations and Execution through Timeline and Scheduling Aids

    NASA Technical Reports Server (NTRS)

    Marquez, Jessica J.; Pyrzak, Guy; Hashemi, Sam; Ahmed, Samia; McMillin, Kevin Edward; Medwid, Joseph Daniel; Chen, Diana; Hurtle, Esten

    2013-01-01

    Since 2003, the NASA Ames Research Center has been actively involved in researching and advancing the state-of-the-art of planning and scheduling tools for NASA mission operations. Our planning toolkit SPIFe (Scheduling and Planning Interface for Exploration) has supported a variety of missions and field tests, scheduling activities for Mars rovers as well as crew on-board International Space Station and NASA earth analogs. The scheduled plan is the integration of all the activities for the day/s. In turn, the agents (rovers, landers, spaceships, crew) execute from this schedule while the mission support team members (e.g., flight controllers) follow the schedule during execution. Over the last couple of years, our team has begun to research and validate methods that will better support users during realtime operations and execution of scheduled activities. Our team utilizes human-computer interaction principles to research user needs, identify workflow processes, prototype software aids, and user test these. This paper discusses three specific prototypes developed and user tested to support real-time operations: Score Mobile, Playbook, and Mobile Assistant for Task Execution (MATE).

  12. Cost efficient command management

    NASA Technical Reports Server (NTRS)

    Brandt, Theresa; Murphy, C. W.; Kuntz, Jon; Barlett, Tom

    1996-01-01

    The design and implementation of a command management system (CMS) for a NASA control center, is described. The technology innovations implemented in the CMS provide the infrastructure required for operations cost reduction and future development cost reduction through increased operational efficiency and reuse in future missions. The command management design facilitates error-free operations which enables the automation of the routine control center functions and allows for the distribution of scheduling responsibility to the instrument teams. The reusable system was developed using object oriented methodologies.

  13. Using Forecasting to Predict Long-Term Resource Utilization for Web Services

    ERIC Educational Resources Information Center

    Yoas, Daniel W.

    2013-01-01

    Researchers have spent years understanding resource utilization to improve scheduling, load balancing, and system management through short-term prediction of resource utilization. Early research focused primarily on single operating systems; later, interest shifted to distributed systems and, finally, into web services. In each case researchers…

  14. Operations planning for Space Station Freedom - And beyond

    NASA Technical Reports Server (NTRS)

    Gibson, Stephen S.; Martin, Thomas E.; Durham, H. J.

    1992-01-01

    The potential of automated planning and electronic execution systems for enhancing operations on board Space Station Freedom (SSF) are discussed. To exploit this potential the Operations Planning and Scheduling Subsystem is being developed at the NASA Johnson Space Center. Such systems may also make valuable contributions to the operation of resource-constrained, long-duration space habitats of the future. Points that should be considered during the design of future long-duration manned space missions are discussed. Early development of a detailed operations concept as an end-to-end mission description offers a basis for iterative design evaluation, refinement, and option comparison, particularly when used with an advanced operations planning system capable of modeling the operations and resource constraints of the proposed designs.

  15. Enhanced round robin CPU scheduling with burst time based time quantum

    NASA Astrophysics Data System (ADS)

    Indusree, J. R.; Prabadevi, B.

    2017-11-01

    Process scheduling is a very important functionality of Operating system. The main-known process-scheduling algorithms are First Come First Serve (FCFS) algorithm, Round Robin (RR) algorithm, Priority scheduling algorithm and Shortest Job First (SJF) algorithm. Compared to its peers, Round Robin (RR) algorithm has the advantage that it gives fair share of CPU to the processes which are already in the ready-queue. The effectiveness of the RR algorithm greatly depends on chosen time quantum value. Through this research paper, we are proposing an enhanced algorithm called Enhanced Round Robin with Burst-time based Time Quantum (ERRBTQ) process scheduling algorithm which calculates time quantum as per the burst-time of processes already in ready queue. The experimental results and analysis of ERRBTQ algorithm clearly indicates the improved performance when compared with conventional RR and its variants.

  16. Synthesized voice approach callouts for air transport operations

    NASA Technical Reports Server (NTRS)

    Simpson, C. A.

    1980-01-01

    A flight simulation experiment was performed to determine the effectiveness of synthesized voice approach callouts for air transport operations. Flight deck data was first collected on scheduled air carrier operations to describe existing pilot-not-flying callout procedures in the flight context and to document the types and amounts of other auditory cockpit information during different types of air carrier operations. A flight simulation scenario for a wide-body jet transport airline training simulator was developed in collaboration with a major U.S. air carrier and flown by three-man crews of qualified line pilots as part of their normally scheduled recurrent training. Each crew flew half their approaches using the experimental synthesized voice approach callout system (SYNCALL) and the other half using the company pilot-not-flying approach callout procedures (PNF). Airspeed and sink rate performance was better with the SYNCALL system than with the PNF system for non-precision approaches. For the one-engine approach, for which SYNCALL made inappropriate deviation callouts, airspeed performance was worse with SYNCALL than with PNF. Reliability of normal altitude approach callouts was comparable for PNF on the line and in the simulator and for SYNCALL in the simulator.

  17. Performance Modeling in CUDA Streams - A Means for High-Throughput Data Processing.

    PubMed

    Li, Hao; Yu, Di; Kumar, Anand; Tu, Yi-Cheng

    2014-10-01

    Push-based database management system (DBMS) is a new type of data processing software that streams large volume of data to concurrent query operators. The high data rate of such systems requires large computing power provided by the query engine. In our previous work, we built a push-based DBMS named G-SDMS to harness the unrivaled computational capabilities of modern GPUs. A major design goal of G-SDMS is to support concurrent processing of heterogenous query processing operations and enable resource allocation among such operations. Understanding the performance of operations as a result of resource consumption is thus a premise in the design of G-SDMS. With NVIDIA's CUDA framework as the system implementation platform, we present our recent work on performance modeling of CUDA kernels running concurrently under a runtime mechanism named CUDA stream . Specifically, we explore the connection between performance and resource occupancy of compute-bound kernels and develop a model that can predict the performance of such kernels. Furthermore, we provide an in-depth anatomy of the CUDA stream mechanism and summarize the main kernel scheduling disciplines in it. Our models and derived scheduling disciplines are verified by extensive experiments using synthetic and real-world CUDA kernels.

  18. Using Operational Analysis to Improve Access to Pulmonary Function Testing.

    PubMed

    Ip, Ada; Asamoah-Barnieh, Raymond; Bischak, Diane P; Davidson, Warren J; Flemons, W Ward; Pendharkar, Sachin R

    2016-01-01

    Background. Timely pulmonary function testing is crucial to improving diagnosis and treatment of pulmonary diseases. Perceptions of poor access at an academic pulmonary function laboratory prompted analysis of system demand and capacity to identify factors contributing to poor access. Methods. Surveys and interviews identified stakeholder perspectives on operational processes and access challenges. Retrospective data on testing demand and resource capacity was analyzed to understand utilization of testing resources. Results. Qualitative analysis demonstrated that stakeholder groups had discrepant views on access and capacity in the laboratory. Mean daily resource utilization was 0.64 (SD 0.15), with monthly average utilization consistently less than 0.75. Reserved testing slots for subspecialty clinics were poorly utilized, leaving many testing slots unfilled. When subspecialty demand exceeded number of reserved slots, there was sufficient capacity in the pulmonary function schedule to accommodate added demand. Findings were shared with stakeholders and influenced scheduling process improvements. Conclusion. This study highlights the importance of operational data to identify causes of poor access, guide system decision-making, and determine effects of improvement initiatives in a variety of healthcare settings. Importantly, simple operational analysis can help to improve efficiency of health systems with little or no added financial investment.

  19. Surgery scheduling optimization considering real life constraints and comprehensive operation cost of operating room.

    PubMed

    Xiang, Wei; Li, Chong

    2015-01-01

    Operating Room (OR) is the core sector in hospital expenditure, the operation management of which involves a complete three-stage surgery flow, multiple resources, prioritization of the various surgeries, and several real-life OR constraints. As such reasonable surgery scheduling is crucial to OR management. To optimize OR management and reduce operation cost, a short-term surgery scheduling problem is proposed and defined based on the survey of the OR operation in a typical hospital in China. The comprehensive operation cost is clearly defined considering both under-utilization and overutilization. A nested Ant Colony Optimization (nested-ACO) incorporated with several real-life OR constraints is proposed to solve such a combinatorial optimization problem. The 10-day manual surgery schedules from a hospital in China are compared with the optimized schedules solved by the nested-ACO. Comparison results show the advantage using the nested-ACO in several measurements: OR-related time, nurse-related time, variation in resources' working time, and the end time. The nested-ACO considering real-life operation constraints such as the difference between first and following case, surgeries priority, and fixed nurses in pre/post-operative stage is proposed to solve the surgery scheduling optimization problem. The results clearly show the benefit of using the nested-ACO in enhancing the OR management efficiency and minimizing the comprehensive overall operation cost.

  20. PRAIS: Distributed, real-time knowledge-based systems made easy

    NASA Technical Reports Server (NTRS)

    Goldstein, David G.

    1990-01-01

    This paper discusses an architecture for real-time, distributed (parallel) knowledge-based systems called the Parallel Real-time Artificial Intelligence System (PRAIS). PRAIS strives for transparently parallelizing production (rule-based) systems, even when under real-time constraints. PRAIS accomplishes these goals by incorporating a dynamic task scheduler, operating system extensions for fact handling, and message-passing among multiple copies of CLIPS executing on a virtual blackboard. This distributed knowledge-based system tool uses the portability of CLIPS and common message-passing protocols to operate over a heterogeneous network of processors.

  1. Machines that Manage.

    ERIC Educational Resources Information Center

    Kennedy, Mike

    2003-01-01

    Describes how facilities-management systems use technology to help schools and universities operate their buildings more efficiently, reduce energy consumption, manage inventory more accurately, keep track of supplies and maintenance schedules, and save money. (EV)

  2. Utilization of artificial intelligence techniques for the Space Station power system

    NASA Technical Reports Server (NTRS)

    Evatt, Thomas C.; Gholdston, Edward W.

    1988-01-01

    Due to the complexity of the Space Station Electrical Power System (EPS) as currently envisioned, artificial intelligence/expert system techniques are being investigated to automate operations, maintenance, and diagnostic functions. A study was conducted to investigate this technology as it applies to failure detection, isolation, and reconfiguration (FDIR) and health monitoring of power system components and of the total system. Control system utilization of expert systems for load scheduling and shedding operations was also researched. A discussion of the utilization of artificial intelligence/expert systems for Initial Operating Capability (IOC) for the Space Station effort is presented along with future plans at Rocketdyne for the utilization of this technology for enhanced Space Station power capability.

  3. The DEEP-South: Scheduling and Data Reduction Software System

    NASA Astrophysics Data System (ADS)

    Yim, Hong-Suh; Kim, Myung-Jin; Bae, Youngho; Moon, Hong-Kyu; Choi, Young-Jun; Roh, Dong-Goo; the DEEP-South Team

    2015-08-01

    The DEep Ecliptic Patrol of the Southern sky (DEEP-South), started in October 2012, is currently in test runs with the first Korea Microlensing Telescope Network (KMTNet) 1.6 m wide-field telescope located at CTIO in Chile. While the primary objective for the DEEP-South is physical characterization of small bodies in the Solar System, it is expected to discover a large number of such bodies, many of them previously unknown.An automatic observation planning and data reduction software subsystem called "The DEEP-South Scheduling and Data reduction System" (the DEEP-South SDS) is currently being designed and implemented for observation planning, data reduction and analysis of huge amount of data with minimum human interaction. The DEEP-South SDS consists of three software subsystems: the DEEP-South Scheduling System (DSS), the Local Data Reduction System (LDR), and the Main Data Reduction System (MDR). The DSS manages observation targets, makes decision on target priority and observation methods, schedules nightly observations, and archive data using the Database Management System (DBMS). The LDR is designed to detect moving objects from CCD images, while the MDR conducts photometry and reconstructs lightcurves. Based on analysis made at the LDR and the MDR, the DSS schedules follow-up observation to be conducted at other KMTNet stations. In the end of 2015, we expect the DEEP-South SDS to achieve a stable operation. We also have a plan to improve the SDS to accomplish finely tuned observation strategy and more efficient data reduction in 2016.

  4. Constraint Maintenance with Preferences and Underlying Flexible Solution

    NASA Technical Reports Server (NTRS)

    Bresina, John; Jonsson, Ari; Morris, Paul; Rajan, Kanna

    2003-01-01

    This paper describes an aspect of the constraint reasoning mechanism. that is part of a ground planning system slated to be used for the Mars Exploration Rovers mission, where two rovers are scheduled to land on Mars in January of 2003. The planning system combines manual planning software from JPL with an automatic planning/scheduling system from NASA Ames Research Center, and is designed to be used in a mixed-initiative mode. Among other things, this means that after a plan has been produced, the human operator can perform extensive modifications under the supervision of the automated. system. For each modification to an activity, the automated system must adjust other activities as needed to ensure that constraints continue to be satisfied. Thus, the system must accommodate change in an interactive setting. Performance is of critical importance for interactive use. This is achieved by maintaining an underlying flexible solution to the temporal constraints, while the system presents a fixed schedule to the user. Adjustments are then a matter of constraint propagation rather than completely re-solving the problem. However, this begs the important question of which fixed schedule (among the ones sanctioned by the underlying flexible solution) should be presented to the user.Our approach uses least-change and other preferences as a prism through which the user views the flexible solution.

  5. EOS: A project to investigate the design and construction of real-time distributed embedded operating systems

    NASA Technical Reports Server (NTRS)

    Campbell, R. H.; Essick, R. B.; Grass, J.; Johnston, G.; Kenny, K.; Russo, V.

    1986-01-01

    The EOS project is investigating the design and construction of a family of real-time distributed embedded operating systems for reliable, distributed aerospace applications. Using the real-time programming techniques developed in co-operation with NASA in earlier research, the project staff is building a kernel for a multiple processor networked system. The first six months of the grant included a study of scheduling in an object-oriented system, the design philosophy of the kernel, and the architectural overview of the operating system. In this report, the operating system and kernel concepts are described. An environment for the experiments has been built and several of the key concepts of the system have been prototyped. The kernel and operating system is intended to support future experimental studies in multiprocessing, load-balancing, routing, software fault-tolerance, distributed data base design, and real-time processing.

  6. Planning and Estimation of Operations Support Requirements

    NASA Technical Reports Server (NTRS)

    Newhouse, Marilyn E.; Barley, Bryan; Bacskay, Allen; Clardy, Dennon

    2010-01-01

    Life Cycle Cost (LCC) estimates during the proposal and early design phases, as well as project replans during the development phase, are heavily focused on hardware development schedules and costs. Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead to de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Any LCC growth can directly impact the programs' ability to fund new missions, and even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations. The National Aeronautics and Space Administration (NASA) D&NF Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that 4 out of the 5 missions studied had significant overruns at or after launch due to underestimation of the complexity and supporting requirements for operations activities; the fifth mission had not launched at the time of the mission. The drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This paper updates the D&NF LCC study, looking at the operations (phase E) cost drivers in more detail and extending the study to include 2 additional missions and identifies areas for increased emphasis by project management in order to improve the fidelity of operations estimates.

  7. 9 CFR 592.96 - Schedule of operation of official plants.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 9 Animals and Animal Products 2 2013-01-01 2013-01-01 false Schedule of operation of official plants. 592.96 Section 592.96 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION VOLUNTARY INSPECTION OF EGG PRODUCTS Performance of Services § 592.96 Schedule of operation of official plant...

  8. 9 CFR 592.96 - Schedule of operation of official plants.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 2 2014-01-01 2014-01-01 false Schedule of operation of official plants. 592.96 Section 592.96 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION VOLUNTARY INSPECTION OF EGG PRODUCTS Performance of Services § 592.96 Schedule of operation of official plant...

  9. 9 CFR 592.96 - Schedule of operation of official plants.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 2 2012-01-01 2012-01-01 false Schedule of operation of official plants. 592.96 Section 592.96 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION VOLUNTARY INSPECTION OF EGG PRODUCTS Performance of Services § 592.96 Schedule of operation of official plant...

  10. 9 CFR 592.96 - Schedule of operation of official plants.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Schedule of operation of official plants. 592.96 Section 592.96 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION VOLUNTARY INSPECTION OF EGG PRODUCTS Performance of Services § 592.96 Schedule of operation of official plant...

  11. Bonneville, Power Administration Timing System

    NASA Technical Reports Server (NTRS)

    Martin, Kenneth E.

    1996-01-01

    Time is an integral part of the Bonneville Power Administration's (BPA) operational systems. Generation and power transfers are planned in advance. Utilities coordinate with each other by making these adjustments on a timed schedule. Price varies with demand, so billing is based on time. Outages for maintenance are scheduled to assure they do not interrupt reliable power delivery. Disturbance records are aligned with recorded timetags for analysis and comparison with related information. Advanced applications like traveling wave fault location and real-time phase measurement require continuous timing with high precision. Most of BPA is served by a Central Time System (CTS) at the Dittmer Control Center near Portland, OR. This system keeps time locally and supplies time to both the control center systems and field locations via a microwave signal. It is kept synchronized to national standard time and coordinated with interconnected utilities. It is the official BPA time. Powwer system control and operation is described, followed by a description of BPA timing systems including CTS, the Fault Location Acquisition Reporter, time dissemination, and phasor measurements. References are provided for further reading.

  12. Modelling Temporal Schedule of Urban Trains Using Agent-Based Simulation and NSGA2-BASED Multiobjective Optimization Approaches

    NASA Astrophysics Data System (ADS)

    Sahelgozin, M.; Alimohammadi, A.

    2015-12-01

    Increasing distances between locations of residence and services leads to a large number of daily commutes in urban areas. Developing subway systems has been taken into consideration of transportation managers as a response to this huge amount of travel demands. In developments of subway infrastructures, representing a temporal schedule for trains is an important task; because an appropriately designed timetable decreases Total passenger travel times, Total Operation Costs and Energy Consumption of trains. Since these variables are not positively correlated, subway scheduling is considered as a multi-criteria optimization problem. Therefore, proposing a proper solution for subway scheduling has been always a controversial issue. On the other hand, research on a phenomenon requires a summarized representation of the real world that is known as Model. In this study, it is attempted to model temporal schedule of urban trains that can be applied in Multi-Criteria Subway Schedule Optimization (MCSSO) problems. At first, a conceptual framework is represented for MCSSO. Then, an agent-based simulation environment is implemented to perform Sensitivity Analysis (SA) that is used to extract the interrelations between the framework components. These interrelations is then taken into account in order to construct the proposed model. In order to evaluate performance of the model in MCSSO problems, Tehran subway line no. 1 is considered as the case study. Results of the study show that the model was able to generate an acceptable distribution of Pareto-optimal solutions which are applicable in the real situations while solving a MCSSO is the goal. Also, the accuracy of the model in representing the operation of subway systems was significant.

  13. 76 FR 48152 - Commercial Building Asset Rating Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-08

    ...: Occupancy schedule. HVAC system operation. Hot water use. Both the user-entered and the internally defined.... Technical Support Full documentation of the rating methodology would be available online for public review... welcome. Potential for Additional Supported Options While a national performance metric and rating system...

  14. 76 FR 45617 - Notice of Lodging of the Consent Decree Under the Clean Water Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-29

    ...) violations stemming from its failure to properly operate and maintain its Combined Sewer Collection System..., implement approved operation and maintenance schedules of its sewers, conduct a pump station evaluation, as... from the Consent Decree Library, P.O. Box 7611, U.S. Department of Justice, Washington, DC 20044-7611...

  15. Space shuttle maintenance program planning document

    NASA Technical Reports Server (NTRS)

    Brown, D. V.

    1972-01-01

    A means for developing a space shuttle maintenance program which will be acceptable to the development centers, the operators (KSC and AF), and the manufacturer is presented. The general organization and decision processes for determining the essential scheduled maintenance requirements for the space shuttle orbiter are outlined. The development of initial scheduled maintenance programs is discussed. The remaining maintenance, that is non-scheduled or non-routine maintenance, is directed by the findings of the scheduled maintenance program and the normal operation of the shuttle. The remaining maintenance consists of maintenance actions to correct discrepancies noted during scheduled maintenance tasks, nonscheduled maintenance, normal operation, or condition monitoring.

  16. Scheduling Aircraft Landings under Constrained Position Shifting

    NASA Technical Reports Server (NTRS)

    Balakrishnan, Hamsa; Chandran, Bala

    2006-01-01

    Optimal scheduling of airport runway operations can play an important role in improving the safety and efficiency of the National Airspace System (NAS). Methods that compute the optimal landing sequence and landing times of aircraft must accommodate practical issues that affect the implementation of the schedule. One such practical consideration, known as Constrained Position Shifting (CPS), is the restriction that each aircraft must land within a pre-specified number of positions of its place in the First-Come-First-Served (FCFS) sequence. We consider the problem of scheduling landings of aircraft in a CPS environment in order to maximize runway throughput (minimize the completion time of the landing sequence), subject to operational constraints such as FAA-specified minimum inter-arrival spacing restrictions, precedence relationships among aircraft that arise either from airline preferences or air traffic control procedures that prevent overtaking, and time windows (representing possible control actions) during which each aircraft landing can occur. We present a Dynamic Programming-based approach that scales linearly in the number of aircraft, and describe our computational experience with a prototype implementation on realistic data for Denver International Airport.

  17. Coping with Irregular Operations: Implications for a Free Flight Environment

    NASA Technical Reports Server (NTRS)

    Orasanu, Judith; Davison, Jeannie; Rodvold, Michelle; Rosekind, Mark R. (Technical Monitor)

    1997-01-01

    Irregular operations involve disruption of scheduled airline operations. They ate of concern to the carriers because they cost money, require personnel effort, and may harm customer good will. Irregular operations may result from aircraft system malfunctions that take planes out of service or result in cancellations, Might system problems or passenger medical emergencies that require diversions, local airport problems that may close down a runway, or weather systems that restrict flow into airports or regions. At the heart of responding to irregular operations is distributed decision making by members of airline operations centers, pilots, and the air traffic control system. Six U.S. carriers participated in a study in which we observed strategies used by operations center personnel to handle various classes of irregular operations. We focused on situations that are most disruptive to regular operations and are most difficult to cope with. We also sought to identify classes of events that would be most affected by changes in the air traffic management system. How a carrier deals with disruptions to its schedule reflects its philosophy and primary goals, as well as its resources. Size and type of operations (short or long-haul) determine which problems have priority. Each airline has different technological support tools to aid in flight planning and replanning, and some carriers have established contingency procedures for coping with various situations. We also examined differences in extent and type of interaction between ABC personnel and various elements of the air traffic system as they managed various problems: who interacts with AM what situations prompt interaction, how often these occur, and the outcomes and Perceived benefits. Use of the expanded NRP program was also studied, along with its advantages to the individual companies. We also examined the implications of the proposed change to a free flight environment on airline strategies for coping with irregular operations.

  18. Application Performance Analysis and Efficient Execution on Systems with multi-core CPUs, GPUs and MICs: A Case Study with Microscopy Image Analysis

    PubMed Central

    Teodoro, George; Kurc, Tahsin; Andrade, Guilherme; Kong, Jun; Ferreira, Renato; Saltz, Joel

    2015-01-01

    We carry out a comparative performance study of multi-core CPUs, GPUs and Intel Xeon Phi (Many Integrated Core-MIC) with a microscopy image analysis application. We experimentally evaluate the performance of computing devices on core operations of the application. We correlate the observed performance with the characteristics of computing devices and data access patterns, computation complexities, and parallelization forms of the operations. The results show a significant variability in the performance of operations with respect to the device used. The performances of operations with regular data access are comparable or sometimes better on a MIC than that on a GPU. GPUs are more efficient than MICs for operations that access data irregularly, because of the lower bandwidth of the MIC for random data accesses. We propose new performance-aware scheduling strategies that consider variabilities in operation speedups. Our scheduling strategies significantly improve application performance compared to classic strategies in hybrid configurations. PMID:28239253

  19. Comparing the performance of expert user heuristics and an integer linear program in aircraft carrier deck operations.

    PubMed

    Ryan, Jason C; Banerjee, Ashis Gopal; Cummings, Mary L; Roy, Nicholas

    2014-06-01

    Planning operations across a number of domains can be considered as resource allocation problems with timing constraints. An unexplored instance of such a problem domain is the aircraft carrier flight deck, where, in current operations, replanning is done without the aid of any computerized decision support. Rather, veteran operators employ a set of experience-based heuristics to quickly generate new operating schedules. These expert user heuristics are neither codified nor evaluated by the United States Navy; they have grown solely from the convergent experiences of supervisory staff. As unmanned aerial vehicles (UAVs) are introduced in the aircraft carrier domain, these heuristics may require alterations due to differing capabilities. The inclusion of UAVs also allows for new opportunities for on-line planning and control, providing an alternative to the current heuristic-based replanning methodology. To investigate these issues formally, we have developed a decision support system for flight deck operations that utilizes a conventional integer linear program-based planning algorithm. In this system, a human operator sets both the goals and constraints for the algorithm, which then returns a proposed schedule for operator approval. As a part of validating this system, the performance of this collaborative human-automation planner was compared with that of the expert user heuristics over a set of test scenarios. The resulting analysis shows that human heuristics often outperform the plans produced by an optimization algorithm, but are also often more conservative.

  20. Nursing operations automation and health care technology innovations: 2025 and beyond.

    PubMed

    Suby, ChrysMarie

    2013-01-01

    This article reviews why nursing operations automation is important, reviews the impact of computer technology on nursing from a historical perspective, and considers the future of nursing operations automation and health care technology innovations in 2025 and beyond. The increasing automation in health care organizations will benefit patient care, staffing and scheduling systems and central staffing offices, census control, and measurement of patient acuity.

  1. Spot and Runway Departure Advisor (SARDA)

    NASA Technical Reports Server (NTRS)

    Jung, Yoon

    2016-01-01

    Spot and Runway Departure Advisor (SARDA) is a decision support tool to assist airline ramp controllers and ATC tower controllers to manage traffic on the airport surface to significantly improve efficiency and predictability in surface operations. The core function of the tool is the runway scheduler which generates an optimal solution for runway sequence and schedule of departure aircraft, which would minimize system delay and maximize runway throughput. The presentation also discusses the latest status of NASA's current surface research through a collaboration with an airline partner, where a tool is developed for airline ramp operators to assist departure pushback operations. The presentation describes the concept of the SARDA tool and results from human-in-the-loop simulations conducted in 2012 for Dallas-Ft. Worth International Airport and 2014 for Charlotte airport ramp tower.

  2. Planning Risk-Based SQC Schedules for Bracketed Operation of Continuous Production Analyzers.

    PubMed

    Westgard, James O; Bayat, Hassan; Westgard, Sten A

    2018-02-01

    To minimize patient risk, "bracketed" statistical quality control (SQC) is recommended in the new CLSI guidelines for SQC (C24-Ed4). Bracketed SQC requires that a QC event both precedes and follows (brackets) a group of patient samples. In optimizing a QC schedule, the frequency of QC or run size becomes an important planning consideration to maintain quality and also facilitate responsive reporting of results from continuous operation of high production analytic systems. Different plans for optimizing a bracketed SQC schedule were investigated on the basis of Parvin's model for patient risk and CLSI C24-Ed4's recommendations for establishing QC schedules. A Sigma-metric run size nomogram was used to evaluate different QC schedules for processes of different sigma performance. For high Sigma performance, an effective SQC approach is to employ a multistage QC procedure utilizing a "startup" design at the beginning of production and a "monitor" design periodically throughout production. Example QC schedules are illustrated for applications with measurement procedures having 6-σ, 5-σ, and 4-σ performance. Continuous production analyzers that demonstrate high σ performance can be effectively controlled with multistage SQC designs that employ a startup QC event followed by periodic monitoring or bracketing QC events. Such designs can be optimized to minimize the risk of harm to patients. © 2017 American Association for Clinical Chemistry.

  3. Planning and Scheduling of Payloads of AstroSat During Initial and Normal Phase Observations

    NASA Astrophysics Data System (ADS)

    Pandiyan, R.; Subbarao, S. V.; Nagamani, T.; Rao, Chaitra; Rao, N. Hari Prasad; Joglekar, Harish; Kumar, Naresh; Dumpa, Surya Ratna Prakash; Chauhan, Anshu; Dakshayani, B. P.

    2017-06-01

    On 28th September 2015, India launched its first astronomical space observatory AstroSat, successfully. AstroSat carried five astronomy payloads, namely, (i) Cadmium Zinc Telluride Imager (CZTI), (ii) Large Area X-ray Proportional Counter (LAXPC), (iii) Soft X-ray Telescope (SXT), (iv) Ultra Violet Imaging Telescope (UVIT) and (v) Scanning Sky Monitor (SSM) and therefore, has the capability to observe celestial objects in multi-wavelength. Four of the payloads are co-aligned along the positive roll axis of the spacecraft and the remaining one is placed along the positive yaw axis direction. All the payloads are sensitive to bright objects and specifically, require avoiding bright Sun within a safe zone of their bore axes in orbit. Further, there are other operational constraints both from spacecraft side and payloads side which are to be strictly enforced during operations. Even on-orbit spacecraft manoeuvres are constrained to about two of the axes in order to avoid bright Sun within this safe zone and a special constrained manoeuvre is exercised during manoeuvres. The planning and scheduling of the payloads during the Performance Verification (PV) phase was carried out in semi-autonomous/manual mode and a complete automation is exercised for normal phase/Guaranteed Time Observation (GuTO) operations. The process is found to be labour intensive and several operational software tools, encompassing spacecraft sub-systems, on-orbit, domain and environmental constraints, were built-in and interacted with the scheduling tool for appropriate decision-making and science scheduling. The procedural details of the complex scheduling of a multi-wavelength astronomy space observatory and their working in PV phase and in normal/GuTO phases are presented in this paper.

  4. A System-Wide Approach to Physician Efficiency and Utilization Rates for Non-Operating Room Anesthesia Sites.

    PubMed

    Tsai, Mitchell H; Huynh, Tinh T; Breidenstein, Max W; O'Donnell, Stephen E; Ehrenfeld, Jesse M; Urman, Richard D

    2017-07-01

    There has been little in the development or application of operating room (OR) management metrics to non-operating room anesthesia (NORA) sites. This is in contrast to the well-developed management framework for the OR management. We hypothesized that by adopting the concept of physician efficiency, we could determine the applicability of this clinical productivity benchmark for physicians providing services for NORA cases at a tertiary care center. We conducted a retrospective data analysis of NORA sites at an academic, rural hospital, including both adult and pediatric patients. Using the time stamps from WiseOR® (Palo Alto, CA), we calculated site utilization and physician efficiency for each day. We defined scheduling efficiency (SE) as the number of staffed anesthesiologists divided by the number of staffed sites and stratified the data into three categories (SE < 1, SE = 1, and SE >1). The mean physician efficiency was 0.293 (95% CI, [0.281, 0.305]), and the mean site utilization was 0.328 (95% CI, [0.314, 0.343]). When days were stratified by scheduling efficiency (SE < 1, =1, or >1), we found differences between physician efficiency and site utilization. On days where scheduling efficiency was less than 1, that is, there are more sites than physicians, mean physician efficiency (95% CI, [0.326, 0.402]) was higher than mean site utilization (95% CI, [0.250, 0.296]). We demonstrate that scheduling efficiency vis-à-vis physician efficiency as an OR management metric diverge when anesthesiologists travel between NORA sites. When the opportunity to scale operational efficiencies is limited, increasing scheduling efficiency by incorporating different NORA sites into a "block" allocation on any given day may be the only suitable tactical alternative.

  5. 50 CFR 218.237 - Applications for Letters of Authorization.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Array Sensor System Low Frequency Active (SURTASS LFA) Sonar § 218.237 Applications for Letters of... scheduled to begin conducting SURTASS LFA sonar operations or the previous Letter of Authorization is...

  6. 50 CFR 218.237 - Applications for Letters of Authorization.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Array Sensor System Low Frequency Active (SURTASS LFA) Sonar § 218.237 Applications for Letters of... scheduled to begin conducting SURTASS LFA sonar operations or the previous Letter of Authorization is...

  7. 50 CFR 218.237 - Applications for Letters of Authorization.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Array Sensor System Low Frequency Active (SURTASS LFA) Sonar § 218.237 Applications for Letters of... scheduled to begin conducting SURTASS LFA sonar operations or the previous Letter of Authorization is...

  8. 50 CFR 216.187 - Applications for Letters of Authorization.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Array Sensor System Low Frequency Active (SURTASS LFA sonar) Sonar § 216.187 Applications for Letters of... scheduled to begin conducting SURTASS LFA sonar operations or the previous Letter of Authorization is...

  9. 50 CFR 216.187 - Applications for Letters of Authorization.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Array Sensor System Low Frequency Active (SURTASS LFA sonar) Sonar § 216.187 Applications for Letters of... scheduled to begin conducting SURTASS LFA sonar operations or the previous Letter of Authorization is...

  10. For operation of the Computer Software Management and Information Center (COSMIC)

    NASA Technical Reports Server (NTRS)

    Carmon, J. L.

    1983-01-01

    Computer programs for degaussing, magnetic field calculation, low speed wing flap systems aerodynamics, structural panel analysis, dynamic stress/strain data acquisition, allocation and network scheduling, and digital filters are discussed.

  11. Columbia's first flight shakes down space transportation system

    NASA Technical Reports Server (NTRS)

    Garrett, D.; Young, D.; White, T.

    1981-01-01

    The first space shuttle mission is described. Topics include launch preparations, flight profile, trajectory, and landing operations. The spaceflight tracking and data network is discussed and the photography and television schedules are included.

  12. A study of interactive control scheduling and economic assessment for robotic systems

    NASA Technical Reports Server (NTRS)

    1982-01-01

    A class of interactive control systems is derived by generalizing interactive manipulator control systems. Tasks of interactive control systems can be represented as a network of a finite set of actions which have specific operational characteristics and specific resource requirements, and which are of limited duration. This has enabled the decomposition of the overall control algorithm simultaneously and asynchronously. The performance benefits of sensor referenced and computer-aided control of manipulators in a complex environment is evaluated. The first phase of the CURV arm control system software development and the basic features of the control algorithms and their software implementation are presented. An optimal solution for a production scheduling problem that will be easy to implement in practical situations is investigated.

  13. Progressive content-based retrieval of image and video with adaptive and iterative refinement

    NASA Technical Reports Server (NTRS)

    Li, Chung-Sheng (Inventor); Turek, John Joseph Edward (Inventor); Castelli, Vittorio (Inventor); Chen, Ming-Syan (Inventor)

    1998-01-01

    A method and apparatus for minimizing the time required to obtain results for a content based query in a data base. More specifically, with this invention, the data base is partitioned into a plurality of groups. Then, a schedule or sequence of groups is assigned to each of the operations of the query, where the schedule represents the order in which an operation of the query will be applied to the groups in the schedule. Each schedule is arranged so that each application of the operation operates on the group which will yield intermediate results that are closest to final results.

  14. Intelligent Transportation Systems/Commercial Vehicle Operations Project Plan For Commercial Vehicle Information Systems And Networks Electronic Data Interchange Standards Development And Deployment

    DOT National Transportation Integrated Search

    1996-12-02

    THE PURPOSE OF THIS DOCUMENT IS TO PROVIDE INFORMATION ON THE PLANNING FOR THE DEVELOPMENT AND DEPLOYMENT OF EDI STANDARDS FOR COMMERCIAL VEHICLE INFORMATION SYSTEMS AND NETWORKS (CVISN). THE STATUS, PRIORITIES, AND SCHEDULES FOR THIS EFFORT ARE CONT...

  15. 40 CFR 60.695 - Monitoring of operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... device outlet gas stream or inlet and outlet gas stream shall be used. (i) For a carbon adsorption system... adsorption system that does not regenerate the carbon bed directly onsite in the control device (e.g., a... carbon adsorption system shall be monitored on a regular schedule, and the existing carbon shall be...

  16. 40 CFR 60.695 - Monitoring of operations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... device outlet gas stream or inlet and outlet gas stream shall be used. (i) For a carbon adsorption system... adsorption system that does not regenerate the carbon bed directly onsite in the control device (e.g., a... carbon adsorption system shall be monitored on a regular schedule, and the existing carbon shall be...

  17. Expert systems and advanced automation for space missions operations

    NASA Technical Reports Server (NTRS)

    Durrani, Sajjad H.; Perkins, Dorothy C.; Carlton, P. Douglas

    1990-01-01

    Increased complexity of space missions during the 1980s led to the introduction of expert systems and advanced automation techniques in mission operations. This paper describes several technologies in operational use or under development at the National Aeronautics and Space Administration's Goddard Space Flight Center. Several expert systems are described that diagnose faults, analyze spacecraft operations and onboard subsystem performance (in conjunction with neural networks), and perform data quality and data accounting functions. The design of customized user interfaces is discussed, with examples of their application to space missions. Displays, which allow mission operators to see the spacecraft position, orientation, and configuration under a variety of operating conditions, are described. Automated systems for scheduling are discussed, and a testbed that allows tests and demonstrations of the associated architectures, interface protocols, and operations concepts is described. Lessons learned are summarized.

  18. Space X-3 Social Media Tour of KSC Facilities

    NASA Image and Video Library

    2014-03-14

    CAPE CANAVERAL, Fla. – A group of news media and social media tweeters toured the Launch Abort System Facility and viewed the launch abort system for the Orion spacecraft at NASA's Kennedy Space Center in Florida. Speaking to the group is Scott Wilson, manager of Production Operations for the Orion Program. The group also toured the Launch Control Center and Vehicle Assembly Building, legacy facilities that are being upgraded by the Ground Systems Development and Operations Program at Kennedy to prepare for processing and launch of NASA's Space Launch System and Orion spacecraft. NASA is developing the Space Launch System and Orion spacecraft to provide an entirely new capability for human exploration beyond low-Earth orbit, with the flexibility to launch spacecraft for crew and cargo missions, including to an asteroid and Mars. Orion’s first unpiloted test flight is scheduled to launch later this year atop a Delta IV rocket. A second uncrewed flight test is scheduled for fiscal year 2018 on the Space Launch System rocket. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Cory Huston

  19. Algorithm for decision support as the tool for control system of industries with variable assortment of products

    NASA Astrophysics Data System (ADS)

    Ladaniuk, Anatolii; Ivashchuk, Viacheslav; Kisała, Piotr; Askarova, Nursanat; Sagymbekova, Azhar

    2015-12-01

    Conditions of diversification of enterprise products are involving for changes of higher levels of management hierarchy, so it's leading by tasks correcting and changing schedule for operating of production plans. Ordinary solve by combination of enterprise resource are planning and management execution system often has exclusively statistical content. So, the development of decision support system, that helps to use knowledge about subject for capabilities estimating and order of operation of production object is relevant in this time.

  20. Dynamic Modeling of ALS Systems

    NASA Technical Reports Server (NTRS)

    Jones, Harry

    2002-01-01

    The purpose of dynamic modeling and simulation of Advanced Life Support (ALS) systems is to help design them. Static steady state systems analysis provides basic information and is necessary to guide dynamic modeling, but static analysis is not sufficient to design and compare systems. ALS systems must respond to external input variations and internal off-nominal behavior. Buffer sizing, resupply scheduling, failure response, and control system design are aspects of dynamic system design. We develop two dynamic mass flow models and use them in simulations to evaluate systems issues, optimize designs, and make system design trades. One model is of nitrogen leakage in the space station, the other is of a waste processor failure in a regenerative life support system. Most systems analyses are concerned with optimizing the cost/benefit of a system at its nominal steady-state operating point. ALS analysis must go beyond the static steady state to include dynamic system design. All life support systems exhibit behavior that varies over time. ALS systems must respond to equipment operating cycles, repair schedules, and occasional off-nominal behavior or malfunctions. Biological components, such as bioreactors, composters, and food plant growth chambers, usually have operating cycles or other complex time behavior. Buffer sizes, material stocks, and resupply rates determine dynamic system behavior and directly affect system mass and cost. Dynamic simulation is needed to avoid the extremes of costly over-design of buffers and material reserves or system failure due to insufficient buffers and lack of stored material.

  1. Parallel processing of real-time dynamic systems simulation on OSCAR (Optimally SCheduled Advanced multiprocessoR)

    NASA Technical Reports Server (NTRS)

    Kasahara, Hironori; Honda, Hiroki; Narita, Seinosuke

    1989-01-01

    Parallel processing of real-time dynamic systems simulation on a multiprocessor system named OSCAR is presented. In the simulation of dynamic systems, generally, the same calculation are repeated every time step. However, we cannot apply to Do-all or the Do-across techniques for parallel processing of the simulation since there exist data dependencies from the end of an iteration to the beginning of the next iteration and furthermore data-input and data-output are required every sampling time period. Therefore, parallelism inside the calculation required for a single time step, or a large basic block which consists of arithmetic assignment statements, must be used. In the proposed method, near fine grain tasks, each of which consists of one or more floating point operations, are generated to extract the parallelism from the calculation and assigned to processors by using optimal static scheduling at compile time in order to reduce large run time overhead caused by the use of near fine grain tasks. The practicality of the scheme is demonstrated on OSCAR (Optimally SCheduled Advanced multiprocessoR) which has been developed to extract advantageous features of static scheduling algorithms to the maximum extent.

  2. Infusion of innovative technologies for mission operations

    NASA Astrophysics Data System (ADS)

    Donati, Alessandro

    2010-11-01

    The Advanced Mission Concepts and Technologies Office (Mission Technologies Office, MTO for short) at the European Space Operations Centre (ESOC) of ESA is entrusted with research and development of innovative mission operations concepts systems and provides operations support to special projects. Visions of future missions and requests for improvements from currently flying missions are the two major sources of inspiration to conceptualize innovative or improved mission operations processes. They include monitoring and diagnostics, planning and scheduling, resource management and optimization. The newly identified operations concepts are then proved by means of prototypes, built with embedded, enabling technology and deployed as shadow applications in mission operations for an extended validation phase. The technology so far exploited includes informatics, artificial intelligence and operational research branches. Recent outstanding results include artificial intelligence planning and scheduling applications for Mars Express, advanced integrated space weather monitoring system for the Integral space telescope and a suite of growing client applications for MUST (Mission Utilities Support Tools). The research, development and validation activities at the Mission technologies office are performed together with a network of research institutes across Europe. The objective is narrowing the gap between enabling and innovative technology and space mission operations. The paper first addresses samples of technology infusion cases with their lessons learnt. The second part is focused on the process and the methodology used at the Mission technologies office to fulfill its objectives.

  3. Operational Impacts of Operating Reserve Demand Curves on Production Cost and Reliability

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krad, Ibrahim; Ibanez, Eduardo; Ela, Erik

    The electric power industry landscape is continually evolving. As emerging technologies such as wind, solar, electric vehicles, and energy storage systems become more cost-effective and present in the system, traditional power system operating strategies will need to be reevaluated. The presence of wind and solar generation (commonly referred to as variable generation) may result in an increase in the variability and uncertainty of the net load profile. One mechanism to mitigate this is to schedule and dispatch additional operating reserves. These operating reserves aim to ensure that there is enough capacity online in the system to account for the increasedmore » variability and uncertainty occurring at finer temporal resolutions. A new operating reserve strategy, referred to as flexibility reserve, has been introduced in some regions. A similar implementation is explored in this paper, and its implications on power system operations are analyzed.« less

  4. Operational Impacts of Operating Reserve Demand Curves on Production Cost and Reliability: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krad, Ibrahim; Ibanez, Eduardo; Ela, Erik

    The electric power industry landscape is continually evolving. As emerging technologies such as wind, solar, electric vehicles, and energy storage systems become more cost-effective and present in the system, traditional power system operating strategies will need to be reevaluated. The presence of wind and solar generation (commonly referred to as variable generation) may result in an increase in the variability and uncertainty of the net load profile. One mechanism to mitigate this is to schedule and dispatch additional operating reserves. These operating reserves aim to ensure that there is enough capacity online in the system to account for the increasedmore » variability and uncertainty occurring at finer temporal resolutions. A new operating reserve strategy, referred to as flexibility reserve, has been introduced in some regions. A similar implementation is explored in this paper, and its implications on power system operations are analyzed.« less

  5. NOAA satellite observing systems: status and plans

    NASA Astrophysics Data System (ADS)

    John Hussey, W.; Schneider, Stanley R.; Gird, Ronald S.; Needham, Bruce H.

    1991-07-01

    NOAA's National Environmental Satellite, Data, and Information Service (NESDIS) operates separates series of environmental monitoring satellites in polar and geostationary orbits. Two geostationary spacecraft are normally in opration: one stationed at 75° E longitude (GOES-EAST), and one stationed at 135° W longitude (GOES-WEST). Owing to a combination of premature in-orbit failures and a launch failure there is only one GOES satellite currently operational, GOES-7, which is migrated between 95° and 105° W longitude depending upon season. GOES-7 was launched in February 1987. Its primary observing instrument is a combined imager/sounder, the VISSR Atmospheric Sounder (VAS). The first in the next series of GOES satellite, (GOES I-M), is scheduled for launch in 1992. The major upgrade over the current GOES satellites will be the introduction of simultaneous imaging and sounding capability and improvements in imaging IR and sounding resolution. Because of the long lead times necessary in designing and building new systems, NOAA, in cooperation with NASA, has already begun the planning and study process for the GOES-N series of satellites, which will fly early in the next century. NOAA operates a two polar satellite system with equatorial nodal crossing times of 0730 (descending) and 1345 (ascending). The current operational satellites are NOAA-10 (AM) and NOAA-11 (PM). The next in the series (NOAA-D, which will become NOAA-12 once operational) is scheduled for launch in early summer 1991. The instruments onboard are used to make global measurements of numerous parameters such as atmospheric temperature, water vapor, ozone, sea surface temperature, sea ice, and vegetation. The NOAA K-N series of satellites, scheduled for deployment in the mid 1990's, will provide upgraded imaging and sounding capability. The imager will be enhanced to include a sixth channel for cloud/ice descrimination. A 15 channel advanced microwave sounder will be manifested for atmospheric temperature retrievals, and a seperate 5 channel advanced microwave sounder will be used for atmospheric water vapor retrievals. The polar program will undergo major changes beginning in the late 1990's. The morning polar metsat service will become the responsibility of the Europeans with NOAA providing an operational sensor payload. The afternoon metsat service will be continued by NOAA with a new block of satellites and instruments beginning at NOAA-O. NOAA will also be closely cooperating with NASA in this time frame. A number of the instruments on NASA's Earth Observing System (EOS) platforms, scheduled for launch beginning in the late 1990's, have been designated "prototype operational" and may become candidates for eventual flight on NOAA operational spacecraft.

  6. Assessment of Operational Barriers and Impediments to Transit Use: Transit Information and Scheduling for Major Activity Centers

    DOT National Transportation Integrated Search

    2001-12-01

    The decision to use public transit as a means of alternative transportation is a somewhat complex process. The potential rider must know that a public transportation system is available, how to contact the public transportation system for information...

  7. 30 CFR 1220.011 - Schedule of allowable direct and allocable joint costs and credits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... Saltwater disposal wells Volume or wells. Source water wells and supply systems Volume. Roads Wells..., installing, operating, repairing and maintaining communication systems, including radio, microwave facilities... contributions made to obtain information about the structure or other characteristics of the geology underlying...

  8. 30 CFR 1220.011 - Schedule of allowable direct and allocable joint costs and credits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .... Saltwater disposal wells Volume or wells. Source water wells and supply systems Volume. Roads Wells..., installing, operating, repairing and maintaining communication systems, including radio, microwave facilities... contributions made to obtain information about the structure or other characteristics of the geology underlying...

  9. 30 CFR 1220.011 - Schedule of allowable direct and allocable joint costs and credits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Volume or wells. Source water wells and supply systems Volume. Roads Wells. Production/drilling platform..., installing, operating, repairing and maintaining communication systems, including radio, microwave facilities... contributions made to obtain information about the structure or other characteristics of the geology underlying...

  10. 75 FR 15371 - Time Error Correction Reliability Standard

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... Electric Reliability Council of Texas (ERCOT) manages the flow of electric power to 22 million Texas customers. As the independent system operator for the region, ERCOT schedules power on an electric grid that... Coordinating Council (WECC) is responsible for coordinating and promoting bulk electric system reliability in...

  11. Observation Scheduling System

    NASA Technical Reports Server (NTRS)

    Chien, Steve A.; Tran, Daniel Q.; Rabideau, Gregg R.; Schaffer, Steven R.

    2011-01-01

    Software has been designed to schedule remote sensing with the Earth Observing One spacecraft. The software attempts to satisfy as many observation requests as possible considering each against spacecraft operation constraints such as data volume, thermal, pointing maneuvers, and others. More complex constraints such as temperature are approximated to enable efficient reasoning while keeping the spacecraft within safe limits. Other constraints are checked using an external software library. For example, an attitude control library is used to determine the feasibility of maneuvering between pairs of observations. This innovation can deal with a wide range of spacecraft constraints and solve large scale scheduling problems like hundreds of observations and thousands of combinations of observation sequences.

  12. Automation Improves Schedule Quality and Increases Scheduling Efficiency for Residents.

    PubMed

    Perelstein, Elizabeth; Rose, Ariella; Hong, Young-Chae; Cohn, Amy; Long, Micah T

    2016-02-01

    Medical resident scheduling is difficult due to multiple rules, competing educational goals, and ever-evolving graduate medical education requirements. Despite this, schedules are typically created manually, consuming hours of work, producing schedules of varying quality, and yielding negative consequences for resident morale and learning. To determine whether computerized decision support can improve the construction of residency schedules, saving time and improving schedule quality. The Optimized Residency Scheduling Assistant was designed by a team from the University of Michigan Department of Industrial and Operations Engineering. It was implemented in the C.S. Mott Children's Hospital Pediatric Emergency Department in the 2012-2013 academic year. The 4 metrics of schedule quality that were compared between the 2010-2011 and 2012-2013 academic years were the incidence of challenging shift transitions, the incidence of shifts following continuity clinics, the total shift inequity, and the night shift inequity. All scheduling rules were successfully incorporated. Average schedule creation time fell from 22 to 28 hours to 4 to 6 hours per month, and 3 of 4 metrics of schedule quality significantly improved. For the implementation year, the incidence of challenging shift transitions decreased from 83 to 14 (P < .01); the incidence of postclinic shifts decreased from 72 to 32 (P < .01); and the SD of night shifts dropped by 55.6% (P < .01). This automated shift scheduling system improves the current manual scheduling process, reducing time spent and improving schedule quality. Embracing such automated tools can benefit residency programs with shift-based scheduling needs.

  13. Embedded real-time operating system micro kernel design

    NASA Astrophysics Data System (ADS)

    Cheng, Xiao-hui; Li, Ming-qiang; Wang, Xin-zheng

    2005-12-01

    Embedded systems usually require a real-time character. Base on an 8051 microcontroller, an embedded real-time operating system micro kernel is proposed consisting of six parts, including a critical section process, task scheduling, interruption handle, semaphore and message mailbox communication, clock managent and memory managent. Distributed CPU and other resources are among tasks rationally according to the importance and urgency. The design proposed here provides the position, definition, function and principle of micro kernel. The kernel runs on the platform of an ATMEL AT89C51 microcontroller. Simulation results prove that the designed micro kernel is stable and reliable and has quick response while operating in an application system.

  14. Airline Operations Aid

    NASA Technical Reports Server (NTRS)

    1993-01-01

    C Language Integrated Production System (CLIPS), a NASA-developed expert systems program, is used by American Airlines for three purposes: as a rapid prototyping tool; to develop production prototypes; and to develop production application. An example of the latter is CLIPS' use in "Hub S1AAshing," a knowledge based system that recommends contingency plans when severe schedule reductions must be made. Hub S1AAshing has replaced a manual, labor intensive process. It saves time and allows Operations Control Coordinators to handle more difficult situations. Because the system assimilates much of the information necessary to facilitate educated decision making, it minimizes negative impact in situations where it is impossible to operate all flights.

  15. A collaborative scheduling model for the supply-hub with multiple suppliers and multiple manufacturers.

    PubMed

    Li, Guo; Lv, Fei; Guan, Xu

    2014-01-01

    This paper investigates a collaborative scheduling model in the assembly system, wherein multiple suppliers have to deliver their components to the multiple manufacturers under the operation of Supply-Hub. We first develop two different scenarios to examine the impact of Supply-Hub. One is that suppliers and manufacturers make their decisions separately, and the other is that the Supply-Hub makes joint decisions with collaborative scheduling. The results show that our scheduling model with the Supply-Hub is a NP-complete problem, therefore, we propose an auto-adapted differential evolution algorithm to solve this problem. Moreover, we illustrate that the performance of collaborative scheduling by the Supply-Hub is superior to separate decision made by each manufacturer and supplier. Furthermore, we also show that the algorithm proposed has good convergence and reliability, which can be applicable to more complicated supply chain environment.

  16. A Collaborative Scheduling Model for the Supply-Hub with Multiple Suppliers and Multiple Manufacturers

    PubMed Central

    Lv, Fei; Guan, Xu

    2014-01-01

    This paper investigates a collaborative scheduling model in the assembly system, wherein multiple suppliers have to deliver their components to the multiple manufacturers under the operation of Supply-Hub. We first develop two different scenarios to examine the impact of Supply-Hub. One is that suppliers and manufacturers make their decisions separately, and the other is that the Supply-Hub makes joint decisions with collaborative scheduling. The results show that our scheduling model with the Supply-Hub is a NP-complete problem, therefore, we propose an auto-adapted differential evolution algorithm to solve this problem. Moreover, we illustrate that the performance of collaborative scheduling by the Supply-Hub is superior to separate decision made by each manufacturer and supplier. Furthermore, we also show that the algorithm proposed has good convergence and reliability, which can be applicable to more complicated supply chain environment. PMID:24892104

  17. Proposed Schedule for Fenton Hill Experiments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Albright, James N.; Brown, Donald W.

    To help in planning Fenton Hill experimental operations in concert with preparations for the Long-Term Flow Test (LTFT) next summer, the following schedule is proposed. This schedule fits some of the realities of the next few months, including the Laboratory closure during the Holidays, the seismic monitoring tests in Roswell, and the difficulties of operating during the winter months. Whenever possible, cyclic pumping operations during the colder months will be scheduled so that the pump will be on during the late evening and early morning hours to prevent freezeup.

  18. Representations and evolutionary operators for the scheduling of pump operations in water distribution networks.

    PubMed

    López-Ibáñez, Manuel; Prasad, T Devi; Paechter, Ben

    2011-01-01

    Reducing the energy consumption of water distribution networks has never had more significance. The greatest energy savings can be obtained by carefully scheduling the operations of pumps. Schedules can be defined either implicitly, in terms of other elements of the network such as tank levels; or explicitly, by specifying the time during which each pump is on/off. The traditional representation of explicit schedules is a string of binary values with each bit representing pump on/off status during a particular time interval. In this paper, we formally define and analyze two new explicit representations based on time-controlled triggers, where the maximum number of pump switches is established beforehand and the schedule may contain fewer than the maximum number of switches. In these representations, a pump schedule is divided into a series of integers with each integer representing the number of hours for which a pump is active/inactive. This reduces the number of potential schedules compared to the binary representation, and allows the algorithm to operate on the feasible region of the search space. We propose evolutionary operators for these two new representations. The new representations and their corresponding operations are compared with the two most-used representations in pump scheduling, namely, binary representation and level-controlled triggers. A detailed statistical analysis of the results indicates which parameters have the greatest effect on the performance of evolutionary algorithms. The empirical results show that an evolutionary algorithm using the proposed representations is an improvement over the results obtained by a recent state of the art hybrid genetic algorithm for pump scheduling using level-controlled triggers.

  19. The development of an augmentor wing jet STOL research aircraft (modified C-8A). Volume 2: Analysis of contractor's flight test

    NASA Technical Reports Server (NTRS)

    Skavdahl, H.; Patterson, D. H.

    1972-01-01

    The initial flight test phase of the modified C-8A airplane was conducted. The primary objective of the testing was to establish the basic airworthiness of the research vehicle. This included verification of the structural design and evaluation of the aircraft's systems. Only a minimum amount of performance testing was scheduled; this has been used to provide a preliminary indication of the airplane's performance and flight characteristics for future flight planning. The testing included flutter and loads investigations up to the maximum design speed. The operational characteristics of all systems were assessed including hydraulics, environmental control system, air ducts, the vectoring conical nozzles, and the stability augmentation system (SAS). Approaches to stall were made at three primary flap settings: up, 30 deg and 65 deg, but full stalls were not scheduled. Minimum control speeds and maneuver margins were checked. All takeoffs and landings were conventional, and STOL performance was not scheduled during this phase of the evaluation.

  20. User interface issues in supporting human-computer integrated scheduling

    NASA Technical Reports Server (NTRS)

    Cooper, Lynne P.; Biefeld, Eric W.

    1991-01-01

    Explored here is the user interface problems encountered with the Operations Missions Planner (OMP) project at the Jet Propulsion Laboratory (JPL). OMP uses a unique iterative approach to planning that places additional requirements on the user interface, particularly to support system development and maintenance. These requirements are necessary to support the concepts of heuristically controlled search, in-progress assessment, and iterative refinement of the schedule. The techniques used to address the OMP interface needs are given.

  1. 75 FR 52461 - Drawbridge Operation Regulation; Pocomoke River, Snow Hill, MD

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-26

    ... this single leaf bascule drawbridge, has requested a temporary deviation from the current operating schedule to facilitate cleaning and painting the structure. Under the regular operating schedule, the...

  2. Collaborative Arrival Planning: Data Sharing and User Preference Tools

    NASA Technical Reports Server (NTRS)

    Zelenka, Richard E.; Edwards, Thomas A. (Technical Monitor)

    1998-01-01

    Air traffic growth and air carrier economic pressures have motivated efforts to increase the flexibility of the air traffic management process and change the relationship between the air traffic control service provider and the system user. One of the most visible of these efforts is the U.S. government/industry "free flight" initiative, in which the service provider concentrates on safety and cross-airline fairness, and the user on their business objectives and operating preferences, including selecting their own path and speed in real-time. In the terminal arrival phase of flight, severe restrictions and rigid control are currently placed on system users, typically without regard for individual user operational preferences. Airborne delays applied to arriving aircraft into capacity constrained airports are imposed on a first-come, first-serve basis, and thus do not allow the system user to plan for or prioritize late arrivals, or to economically optimize their arrival sequence. A central tenant of the free-flight operating paradigm is collaboration between service providers and users in reaching air traffic management decisions. Such collaboration would be particularly beneficial to an airline's "hub" operation, where off-schedule arrival aircraft are a consistent problem, as they cause serious air-port ramp difficulties, rippling airline scheduling effects, and result in large economic inefficiencies. Greater collaboration can also lead to increased airport capacity and decrease the severity of over-capacity rush periods. In the NASA Collaborative Arrival Planning (CAP) project, both independent exchange of real-time data between the service provider and system user and collaborative decision support tools are addressed. Data exchange of real-time arrival scheduling, airspace management, and air carrier fleet data between the FAA service provider and an air carrier is being conducted and evaluated. Collaborative arrival decision support tools to allow intra-airline arrival preferences are being developed and simulated. The CAP project is part of and leveraged from the NASA/FAA Center TRACON Automation System (CTAS), a fielded set of decision support tools that provide computer generated advisories for both enroute and terminal area controllers to manage and control arrival traffic more efficiently. In this paper, the NASA Collaborative Arrival Planning project is outlined and recent results detailed, including the real-time use of CTAS arrival scheduling data by a major air carrier and simulations of tactical and strategic user preference decision support tools.

  3. Precision Departure Release Capability (PDRC): NASA to FAA Research Transition

    NASA Technical Reports Server (NTRS)

    Engelland, Shawn; Davis, Thomas J.

    2013-01-01

    After takeoff, aircraft must merge into en route (Center) airspace traffic flows which may be subject to constraints that create localized demand-capacity imbalances. When demand exceeds capacity, Traffic Management Coordinators (TMCs) and Frontline Managers (FLMs) often use tactical departure scheduling to manage the flow of departures into the constrained Center traffic flow. Tactical departure scheduling usually involves use of a Call for Release (CFR) procedure wherein the Tower must call the Center to coordinate a release time prior to allowing the flight to depart. In present-day operations release times are computed by the Center Traffic Management Advisor (TMA) decision support tool based upon manual estimates of aircraft ready time verbally communicated from the Tower to the Center. The TMA-computed release time is verbally communicated from the Center back to the Tower where it is relayed to the Local controller as a release window that is typically three minutes wide. The Local controller will manage the departure to meet the coordinated release time window. Manual ready time prediction and verbal release time coordination are labor intensive and prone to inaccuracy. Also, use of release time windows adds uncertainty to the tactical departure process. Analysis of more than one million flights from January 2011 indicates that a significant number of tactically scheduled aircraft missed their en route slot due to ready time prediction uncertainty. Uncertainty in ready time estimates may result in missed opportunities to merge into constrained en route flows and lead to lost throughput. Next Generation Air Transportation System plans call for development of Tower automation systems capable of computing surface trajectory-based ready time estimates. NASA has developed the Precision Departure Release Capability (PDRC) concept that improves tactical departure scheduling by automatically communicating surface trajectory-based ready time predictions and departure runway assignments to the Center scheduling tool. The PDRC concept also incorporates earlier NASA and FAA research into automation-assisted CFR coordination. The PDRC concept reduces uncertainty by automatically communicating coordinated release times with seconds-level precision enabling TMCs and FLMs to work with target times rather than windows. NASA has developed a PDRC prototype system that integrates the Center's TMA system with a research prototype Tower decision support tool. A two-phase field evaluation was conducted at NASA's North Texas Research Station in Dallas-Fort Worth. The field evaluation validated the PDRC concept and demonstrated reduced release time uncertainty while being used for tactical departure scheduling of more than 230 operational flights over 29 weeks of operations.

  4. Reserve valuation in electric power systems

    NASA Astrophysics Data System (ADS)

    Ruiz, Pablo Ariel

    Operational reliability is provided in part by scheduling capacity in excess of the load forecast. This reserve capacity balances the uncertain power demand with the supply in real time and provides for equipment outages. Traditionally, reserve scheduling has been ensured by enforcing reserve requirements in the operations planning. An alternate approach is to employ a stochastic formulation, which allows the explicit modeling of the sources of uncertainty. This thesis compares stochastic and reserve methods and evaluates the benefits of a combined approach for the efficient management of uncertainty in the unit commitment problem. Numerical studies show that the unit commitment solutions obtained for the combined approach are robust and superior with respect to the traditional approach. These robust solutions are especially valuable in areas with a high proportion of wind power, as their built-in flexibility allows the dispatch of practically all the available wind power while minimizing the costs of operation. The scheduled reserve has an economic value since it reduces the outage costs. In several electricity markets, reserve demand functions have been implemented to take into account the value of reserve in the market clearing process. These often take the form of a step-down function at the reserve requirement level, and as such they may not appropriately represent the reserve value. The value of reserve is impacted by the reliability, dynamic and stochastic characteristics of system components, the system operation policies, and the economic aspects such as the risk preferences of the demand. In this thesis, these aspects are taken into account to approximate the reserve value and construct reserve demand functions. Illustrative examples show that the demand functions constructed have similarities with those implemented in some markets.

  5. Sensibility study in a flexible job shop scheduling problem

    NASA Astrophysics Data System (ADS)

    Curralo, Ana; Pereira, Ana I.; Barbosa, José; Leitão, Paulo

    2013-10-01

    This paper proposes the impact assessment of the jobs order in the optimal time of operations in a Flexible Job Shop Scheduling Problem. In this work a real assembly cell was studied: the AIP-PRIMECA cell at the Université de Valenciennes et du Hainaut-Cambrésis, in France, which is considered as a Flexible Job Shop problem. The problem consists in finding the machines operations schedule, taking into account the precedence constraints. The main objective is to minimize the batch makespan, i.e. the finish time of the last operation completed in the schedule. Shortly, the present study consists in evaluating if the jobs order affects the optimal time of the operations schedule. The genetic algorithm was used to solve the optimization problem. As a conclusion, it's assessed that the jobs order influence the optimal time.

  6. Protocols for distributive scheduling

    NASA Technical Reports Server (NTRS)

    Richards, Stephen F.; Fox, Barry

    1993-01-01

    The increasing complexity of space operations and the inclusion of interorganizational and international groups in the planning and control of space missions lead to requirements for greater communication, coordination, and cooperation among mission schedulers. These schedulers must jointly allocate scarce shared resources among the various operational and mission oriented activities while adhering to all constraints. This scheduling environment is complicated by such factors as the presence of varying perspectives and conflicting objectives among the schedulers, the need for different schedulers to work in parallel, and limited communication among schedulers. Smooth interaction among schedulers requires the use of protocols that govern such issues as resource sharing, authority to update the schedule, and communication of updates. This paper addresses the development and characteristics of such protocols and their use in a distributed scheduling environment that incorporates computer-aided scheduling tools. An example problem is drawn from the domain of space shuttle mission planning.

  7. Distributed project scheduling at NASA: Requirements for manual protocols and computer-based support

    NASA Technical Reports Server (NTRS)

    Richards, Stephen F.

    1992-01-01

    The increasing complexity of space operations and the inclusion of interorganizational and international groups in the planning and control of space missions lead to requirements for greater communication, coordination, and cooperation among mission schedulers. These schedulers must jointly allocate scarce shared resources among the various operational and mission oriented activities while adhering to all constraints. This scheduling environment is complicated by such factors as the presence of varying perspectives and conflicting objectives among the schedulers, the need for different schedulers to work in parallel, and limited communication among schedulers. Smooth interaction among schedulers requires the use of protocols that govern such issues as resource sharing, authority to update the schedule, and communication of updates. This paper addresses the development and characteristics of such protocols and their use in a distributed scheduling environment that incorporates computer-aided scheduling tools. An example problem is drawn from the domain of Space Shuttle mission planning.

  8. Best Practices for Fatigue Risk Management in Non-Traditional Shiftwork

    NASA Technical Reports Server (NTRS)

    Flynn-Evans, Erin E.

    2016-01-01

    Fatigue risk management programs provide effective tools to mitigate fatigue among shift workers. Although such programs are effective for typical shiftwork scenarios, where individuals of equal skill level can be divided into shifts to cover 24 hour operations, traditional programs are not sufficient for managing sleep loss among individuals with unique skill sets, in occupations where non-traditional schedules are required. Such operations are prevalent at NASA and in other high stress occupations, including among airline pilots, military personnel, and expeditioners. These types of operations require fatigue risk management programs tailored to the specific requirements of the mission. Without appropriately tailored fatigue risk management, such operations can lead to an elevated risk of operational failure, disintegration of teamwork, and increased risk of accidents and incidents. In order to design schedules for such operations, schedule planners must evaluate the impact of a given operation on circadian misalignment, acute sleep loss, chronic sleep loss and sleep inertia. In addition, individual-level factors such as morningness-eveningness preference and sleep disorders should be considered. After the impact of each of these factors has been identified, scheduling teams can design schedules that meet operational requirements, while also minimizing fatigue.

  9. Patient Populations, Clinical Associations, and System Efficiency in Healthcare Delivery System

    NASA Astrophysics Data System (ADS)

    Liu, Yazhuo

    The efforts to improve health care delivery usually involve studies and analysis of patient populations and healthcare systems. In this dissertation, I present the research conducted in the following areas: identifying patient groups, improving treatments for specific conditions by using statistical as well as data mining techniques, and developing new operation research models to increase system efficiency from the health institutes' perspective. The results provide better understanding of high risk patient groups, more accuracy in detecting disease' correlations and practical scheduling tools that consider uncertain operation durations and real-life constraints.

  10. A definition of high-level decisions in the engineering of systems

    NASA Astrophysics Data System (ADS)

    Powell, Robert Anthony

    The role of the systems engineer defines that he or she be proactive and guide the program manager and their customers through their decisions to enhance the effectiveness of system development---producing faster, better, and cheaper systems. The present lack of coverage in literature on what these decisions are and how they relate to each other may be a contributing factor to the high rate of failure among system projects. At the onset of the system development process, decisions have an integral role in the design of a system that meets stakeholders' needs. This is apparent during the design and qualification of both the Development System and the Operational System. The performance, cost and schedule of the Development System affect the performance of the Operational System and are affected by decisions that influence physical elements of the Development System. The performance, cost, and schedule of the Operational System is affected by decisions that influence physical elements of the Operational System. Traditionally, product and process have been designed using know-how and trial and error. However, the empiricism of engineers and program managers is limited which can, and has led to costly mistakes. To date, very little research has explored decisions made in the engineering of a system. In government, literature exists on procurement processes for major system development; but in general literature on decisions, how they relate to each other, and the key information requirements within one of two systems and across the two systems is not readily available. This research hopes to improve the processes inherent in the engineering of systems. The primary focus of this research is on department of defense (DoD) military systems, specifically aerospace systems and may generalize more broadly. The result of this research is a process tool, a Decision System Model, which can be used by systems engineers to guide the program manager and their customers through the decisions about concurrently designing and qualifying both the Development and Operational systems.

  11. 18 CFR 35.9 - Requirements for filing rate schedules, tariffs or service agreements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... entire document except as provided in paragraphs (b) and (c) of this section. (b) Open Access...) OATT and other open access documents filed by Independent System Operators or Regional Transmission...

  12. 18 CFR 35.9 - Requirements for filing rate schedules, tariffs or service agreements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... entire document except as provided in paragraphs (b) and (c) of this section. (b) Open Access...) OATT and other open access documents filed by Independent System Operators or Regional Transmission...

  13. Crisis action planning and replanning using SIPE-2

    NASA Technical Reports Server (NTRS)

    Skidmore, Jennifer D.

    1993-01-01

    Rome Laboratory and DARPA are jointly sponsoring an initiative to develop the next generation of AI planning and scheduling technology focused on military operations planning, especially for crisis situations. SRI International has demonstrated their knowledge-based planning technology in this domain with a system called SOCAP, System for Operations Crisis Action Planning. SOCAP's underlying power comes from SIPE-2, a hierarchical, domain-independent, nonlinear AI planner also developed at SRI. This paper discusses the features of SIPE-2 that made it an ideal choice for military operations planning and which contributed greatly to SOCAP's success.

  14. Operating and maintaining your heat recovery ventilator (HRV) -- Revised edition. Home heating and cooling series, Number 8

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    Heat recovery ventilators (HRVs) differ from other mechanical ventilation devices by their ability to exchange heat between supply and exhaust air streams, which reduces the cost of heating or cooling fresh air. This booklet discusses the need for mechanical ventilation in conventional and energy-efficient homes, an explains the components of a HRV system, how to operate and maintain the system, and how to solve operating problems. A maintenance chart and schedule and a HRV troubleshooting guide are included.

  15. Relative influence on total cancelled operating room time from patients who are inpatients or outpatients preoperatively.

    PubMed

    Dexter, Franklin; Maxbauer, Tina; Stout, Carole; Archbold, Laura; Epstein, Richard H

    2014-05-01

    In previous studies, hospitals' operating room (OR) schedules were influenced markedly by decisions made within a few days of surgery. At least half of ORs had their last case scheduled or changed within 2 working days of surgery. In the current investigation, we studied whether many of these changes were due to patients who were admitted before surgery. We differentiated these "inpatients" from "outpatients" having ambulatory surgery or admitted on the day of surgery. From 21 facilities of a nonacademic health system throughout the United States, N = 5 eight-week periods of cancellation data were obtained. From an academic hospital, N = 8 thirteen-week periods of cancellation data were obtained, including detailed audit data with timestamps of the entire scheduling/rescheduling/cancellation history for each case. (1) In the non-academic health system, outpatients accounted for 1.6% ± 0.1% (SEM) of the scheduled minutes that were cancelled, whereas inpatients accounted for 8.1% ± 0.4%. Consequently, even though inpatients represented much less than half the total scheduled minutes of surgery (16.2% ± 0.5%, P < 0.0001), they accounted for approximately half of the total cancelled minutes (overall P = 0.55, 49% ± 2%; hospitals only P = 0.062, 57% ± 3%). (2) In the nonacademic health system, each 10% increase in a facility's percentage of outpatients making a physical visit to a preoperative clinic (versus only a preoperative phone call) was associated with a 0.0% ± 0.1% absolute decrease in cancelled minutes (P = 0.58). (3) In the academic hospital, inpatients accounted for 22.3% ± 0.4% of the scheduled minutes but most of the total cancelled minutes (70% ± 2%, P < 0.0001). Slightly more than half the total inpatient cancelled minutes (54% ± 1%, P = 0.006) were due to cases scheduled within 1 workday prior to the day of surgery (e.g., Friday for Monday, Monday for Tuesday). During this period, inpatient cancellation rates, measured in minutes, were several-fold larger than outpatient rates (P < 0.0001). Facilities can achieve a ≤2% cancellation rate for patients who are outpatient preoperatively with very few attending a preoperative clinic, when a virtual evaluation is carried out by phone. At least half of the cancelled time at health systems and hospitals is attributable to inpatients, and these patients principally are scheduled within 1 workday of the day of surgery. This is why there are so many changes to the OR schedule within 1 workday before the day of surgery. Hospitals should evaluate the cost-effectiveness of earlier assessments of inpatients. In addition, scheduling office decision-making within 1 workday before surgery should be based on statistical forecasts that include the risks of cancellation and of inpatient add-on cases being scheduled. Hospitals should monitor the performance of their perioperative managers with respect to such behavior.

  16. Optimizing integrated airport surface and terminal airspace operations under uncertainty

    NASA Astrophysics Data System (ADS)

    Bosson, Christabelle S.

    In airports and surrounding terminal airspaces, the integration of surface, arrival and departure scheduling and routing have the potential to improve the operations efficiency. Moreover, because both the airport surface and the terminal airspace are often altered by random perturbations, the consideration of uncertainty in flight schedules is crucial to improve the design of robust flight schedules. Previous research mainly focused on independently solving arrival scheduling problems, departure scheduling problems and surface management scheduling problems and most of the developed models are deterministic. This dissertation presents an alternate method to model the integrated operations by using a machine job-shop scheduling formulation. A multistage stochastic programming approach is chosen to formulate the problem in the presence of uncertainty and candidate solutions are obtained by solving sample average approximation problems with finite sample size. The developed mixed-integer-linear-programming algorithm-based scheduler is capable of computing optimal aircraft schedules and routings that reflect the integration of air and ground operations. The assembled methodology is applied to a Los Angeles case study. To show the benefits of integrated operations over First-Come-First-Served, a preliminary proof-of-concept is conducted for a set of fourteen aircraft evolving under deterministic conditions in a model of the Los Angeles International Airport surface and surrounding terminal areas. Using historical data, a representative 30-minute traffic schedule and aircraft mix scenario is constructed. The results of the Los Angeles application show that the integration of air and ground operations and the use of a time-based separation strategy enable both significant surface and air time savings. The solution computed by the optimization provides a more efficient routing and scheduling than the First-Come-First-Served solution. Additionally, a data driven analysis is performed for the Los Angeles environment and probabilistic distributions of pertinent uncertainty sources are obtained. A sensitivity analysis is then carried out to assess the methodology performance and find optimal sampling parameters. Finally, simulations of increasing traffic density in the presence of uncertainty are conducted first for integrated arrivals and departures, then for integrated surface and air operations. To compare the optimization results and show the benefits of integrated operations, two aircraft separation methods are implemented that offer different routing options. The simulations of integrated air operations and the simulations of integrated air and surface operations demonstrate that significant traveling time savings, both total and individual surface and air times, can be obtained when more direct routes are allowed to be traveled even in the presence of uncertainty. The resulting routings induce however extra take off delay for departing flights. As a consequence, some flights cannot meet their initial assigned runway slot which engenders runway position shifting when comparing resulting runway sequences computed under both deterministic and stochastic conditions. The optimization is able to compute an optimal runway schedule that represents an optimal balance between total schedule delays and total travel times.

  17. Solute Concentration at a Pumping Well in Non-Gaussian Random Aquifers under Time-Varying Operational Schedules

    NASA Astrophysics Data System (ADS)

    Libera, A.; de Barros, F.; Riva, M.; Guadagnini, A.

    2016-12-01

    Managing contaminated groundwater systems is an arduous task for multiple reasons. First, subsurface hydraulic properties are heterogeneous and the high costs associated with site characterization leads to data scarcity (therefore, model predictions are uncertain). Second, it is common for water agencies to schedule groundwater extraction through a temporal sequence of pumping rates to maximize the benefits to anthropogenic activities and minimize the environmental footprint of the withdrawal operations. The temporal variability in pumping rates and aquifer heterogeneity affect dilution rates of contaminant plumes and chemical concentration breakthrough curves (BTCs) at the well. While contaminant transport under steady-state pumping is widely studied, the manner in which a given time-varying pumping schedule affects contaminant plume behavior is tackled only marginally. At the same time, most studies focus on the impact of Gaussian random hydraulic conductivity (K) fields on transport. Here, we systematically analyze the significance of the random space function (RSF) model characterizing K in the presence of distinct pumping operations on the uncertainty of the concentration BTC at the operating well. We juxtapose Monte Carlo based numerical results associated with two models: (a) a recently proposed Generalized Sub-Gaussian model which allows capturing non-Gaussian statistical scaling features of RSFs such as hydraulic conductivity, and (b) the commonly used Gaussian field approximation. Our novel results include an appraisal of the coupled effect of (a) the model employed to depict the random spatial variability of K and (b) transient flow regime, as induced by a temporally varying pumping schedule, on the concentration BTC at the operating well. We systematically quantify the sensitivity of the uncertainty in the contaminant BTC to the RSF model adopted for K (non-Gaussian or Gaussian) in the presence of diverse well pumping schedules. Results contribute to determine conditions under which any of these two key factors prevails on the other.

  18. Mission and science activity scheduling language

    NASA Technical Reports Server (NTRS)

    Hull, Larry G.

    1993-01-01

    To support the distributed and complex operational scheduling required for future National Aeronautics and Space Administration (NASA) missions, a formal, textual language, the Scheduling Applications Interface Language (SAIL), has been developed. Increased geographic dispersion of investigators is leading to distributed mission and science activity planning, scheduling, and operations. SAIL is an innovation which supports the effective and efficient communication of scheduling information among physically dispersed applications in distributed scheduling environments. SAIL offers a clear, concise, unambiguous expression of scheduling information in a readable, hardware independent format. The language concept, syntax, and semantics incorporate language features found useful during five years of research and prototyping with scheduling languages in physically distributed environments. SAIL allows concise specification of mission and science activity plans in a format which promotes repetition and reuse.

  19. Reactive Scheduling in Multipurpose Batch Plants

    NASA Astrophysics Data System (ADS)

    Narayani, A.; Shaik, Munawar A.

    2010-10-01

    Scheduling is an important operation in process industries for improving resource utilization resulting in direct economic benefits. It has a two-fold objective of fulfilling customer orders within the specified time as well as maximizing the plant profit. Unexpected disturbances such as machine breakdown, arrival of rush orders and cancellation of orders affect the schedule of the plant. Reactive scheduling is generation of a new schedule which has minimum deviation from the original schedule in spite of the occurrence of unexpected events in the plant operation. Recently, Shaik & Floudas (2009) proposed a novel unified model for short-term scheduling of multipurpose batch plants using unit-specific event-based continuous time representation. In this paper, we extend the model of Shaik & Floudas (2009) to handle reactive scheduling.

  20. Clustering execution in a processing system to increase power savings

    DOEpatents

    Bose, Pradip; Buyuktosunoglu, Alper; Jacobson, Hans M.; Vega, Augusto J.

    2018-03-20

    Embodiments relate to clustering execution in a processing system. An aspect includes accessing a control flow graph that defines a data dependency and an execution sequence of a plurality of tasks of an application that executes on a plurality of system components. The execution sequence of the tasks in the control flow graph is modified as a clustered control flow graph that clusters active and idle phases of a system component while maintaining the data dependency. The clustered control flow graph is sent to an operating system, where the operating system utilizes the clustered control flow graph for scheduling the tasks.

Top