Sample records for operational control tests

  1. A Manual Control Test for the Detection and Deterrence of Impaired Drivers

    NASA Technical Reports Server (NTRS)

    Stein, A. C.; Allen, R. W.; Jex, H. R.

    1984-01-01

    A brief manual control test and a decision strategy were developed, laboratory tested, and field validated which provide a means for detecting human operator impairment from alcohol or other drugs. The test requires the operator to stabilize progressively unstable controlled element dynamics. Control theory and experimental data verify that the human operator's control ability on this task is constrained by basic cybernetic characteristics, and that task performance is reliably affected by impairment effects on these characteristics. Assessment of human operator control ability is determined by a statistically based decision strategy. The operator is allowed several chances to exceed a preset pass criterion. Procedures are described for setting the pass criterion based on individual ability and a desired unimpaired failure rate. These procedures were field tested with apparatus installed in automobiles that were designed to discourage drunk drivers from operating their vehicles. This test program demonstrated that the control task and detection strategy could be applied in a practical setting to screen human operators for impairment in their basic cybernetic skills.

  2. 14 CFR 29.683 - Operation tests.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Design and Construction Control Systems § 29.683 Operation tests. It must be shown by operation tests that, when the controls are operated from the pilot compartment with the control system loaded to correspond with loads specified for the system, the system is free...

  3. 14 CFR 27.683 - Operation tests.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... STANDARDS: NORMAL CATEGORY ROTORCRAFT Design and Construction Control Systems § 27.683 Operation tests. It must be shown by operation tests that, when the controls are operated from the pilot compartment with the control system loaded to correspond with loads specified for the system, the system is free from...

  4. 14 CFR 29.683 - Operation tests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Operation tests. 29.683 Section 29.683... STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Design and Construction Control Systems § 29.683 Operation tests. It must be shown by operation tests that, when the controls are operated from the pilot compartment...

  5. 14 CFR 27.683 - Operation tests.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Operation tests. 27.683 Section 27.683... STANDARDS: NORMAL CATEGORY ROTORCRAFT Design and Construction Control Systems § 27.683 Operation tests. It must be shown by operation tests that, when the controls are operated from the pilot compartment with...

  6. 14 CFR 29.683 - Operation tests.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Operation tests. 29.683 Section 29.683... STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Design and Construction Control Systems § 29.683 Operation tests. It must be shown by operation tests that, when the controls are operated from the pilot compartment...

  7. 14 CFR 27.683 - Operation tests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Operation tests. 27.683 Section 27.683... STANDARDS: NORMAL CATEGORY ROTORCRAFT Design and Construction Control Systems § 27.683 Operation tests. It must be shown by operation tests that, when the controls are operated from the pilot compartment with...

  8. 14 CFR 25.683 - Operation tests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.683 Operation tests. It must be shown by operation tests that when portions of the control system subject to pilot effort loads... control system are loaded to the maximum load expected in normal operation, the system is free from— (a...

  9. 14 CFR 25.683 - Operation tests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.683 Operation tests. It must be shown by operation tests that when portions of the control system subject to pilot effort loads... control system are loaded to the maximum load expected in normal operation, the system is free from— (a...

  10. 14 CFR 25.683 - Operation tests.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.683 Operation tests. It must be shown by operation tests that when portions of the control system subject to pilot effort loads... control system are loaded to the maximum load expected in normal operation, the system is free from— (a...

  11. 14 CFR 25.683 - Operation tests.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.683 Operation tests. It must be shown by operation tests that when portions of the control system subject to pilot effort loads... control system are loaded to the maximum load expected in normal operation, the system is free from— (a...

  12. Tonopah Test Range - Index

    Science.gov Websites

    Capabilities Test Operations Center Test Director Range Control Track Control Communications Tracking Radars Us Range Videos/Photos Range Capabilities Test Operations Center Test Director Range Control Track Control Communications Tracking Radars Optical Systems Cinetheodolites Telescopes R&D Telescopes

  13. Mission control team structure and operational lessons learned from the 2009 and 2010 NASA desert RATS simulated lunar exploration field tests

    NASA Astrophysics Data System (ADS)

    Bell, Ernest R.; Badillo, Victor; Coan, David; Johnson, Kieth; Ney, Zane; Rosenbaum, Megan; Smart, Tifanie; Stone, Jeffry; Stueber, Ronald; Welsh, Daren; Guirgis, Peggy; Looper, Chris; McDaniel, Randall

    2013-10-01

    The NASA Desert Research and Technology Studies (Desert RATS) is an annual field test of advanced concepts, prototype hardware, and potential modes of operation to be used on human planetary surface space exploration missions. For the 2009 and 2010 NASA Desert RATS field tests, various engineering concepts and operational exercises were incorporated into mission timelines with the focus of the majority of daily operations being on simulated lunar geological field operations and executed in a manner similar to current Space Shuttle and International Space Station missions. The field test for 2009 involved a two week lunar exploration simulation utilizing a two-man rover. The 2010 Desert RATS field test took this two week simulation further by incorporating a second two-man rover working in tandem with the 2009 rover, as well as including docked operations with a Pressurized Excursion Module (PEM). Personnel for the field test included the crew, a mission management team, engineering teams, a science team, and the mission operations team. The mission operations team served as the core of the Desert RATS mission control team and included certified NASA Mission Operations Directorate (MOD) flight controllers, former flight controllers, and astronaut personnel. The backgrounds of the flight controllers were in the areas of Extravehicular Activity (EVA), onboard mechanical systems and maintenance, robotics, timeline planning (OpsPlan), and spacecraft communicator (Capcom). With the simulated EVA operations, mechanized operations (the rover), and expectations of replanning, these flight control disciplines were especially well suited for the execution of the 2009 and 2010 Desert RATS field tests. The inclusion of an operations team has provided the added benefit of giving NASA mission operations flight control personnel the opportunity to begin examining operational mission control techniques, team compositions, and mission scenarios. This also gave the mission operations team the opportunity to gain insight into functional hardware requirements via lessons learned from executing the Desert RATS field test missions. This paper will detail the mission control team structure that was used during the 2009 and 2010 Desert RATS Lunar analog missions. It will also present a number of the lessons learned by the operations team during these field tests. Major lessons learned involved Mission Control Center (MCC) operations, pre-mission planning and training processes, procedure requirements, communication requirements, and logistic support for analogs. This knowledge will be applied to future Desert RATS field tests, and other Earth based analog testing for space exploration, to continue the evolution of manned space operations in preparation for human planetary exploration. It is important that operational knowledge for human space exploration missions be obtained during Earth-bound field tests to the greatest extent possible. This allows operations personnel the ability to examine various flight control and crew operations scenarios in preparation for actual space missions.

  14. 14 CFR 25.683 - Operation tests.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Operation tests. 25.683 Section 25.683... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.683 Operation tests. It must be shown by operation tests that when portions of the control system subject to pilot effort loads...

  15. 14 CFR 23.683 - Operation tests.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Design and Construction Control Systems § 23.683 Operation tests. (a) It must be shown by operation tests that, when the controls are... controls, loads not less than those corresponding to the maximum pilot effort established under § 23.405...

  16. 14 CFR 23.683 - Operation tests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Design and Construction Control Systems § 23.683 Operation tests. (a) It must be shown by operation tests that, when the controls are... controls, loads not less than those corresponding to the maximum pilot effort established under § 23.405...

  17. 14 CFR 23.683 - Operation tests.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Design and Construction Control Systems § 23.683 Operation tests. (a) It must be shown by operation tests that, when the controls are... controls, loads not less than those corresponding to the maximum pilot effort established under § 23.405...

  18. 14 CFR 23.683 - Operation tests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Design and Construction Control Systems § 23.683 Operation tests. (a) It must be shown by operation tests that, when the controls are... controls, loads not less than those corresponding to the maximum pilot effort established under § 23.405...

  19. 14 CFR 23.683 - Operation tests.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Design and Construction Control Systems § 23.683 Operation tests. (a) It must be shown by operation tests that, when the controls are... controls, loads not less than those corresponding to the maximum pilot effort established under § 23.405...

  20. 40 CFR 63.4167 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... system and add-on control device operating limits during the performance test? 63.4167 Section 63.4167... Emission Rate with Add-on Controls Option § 63.4167 How do I establish the emission capture system and add-on control device operating limits during the performance test? During the performance test required...

  1. Aquatic Plant Control Research Program. Large-Scale Operations Management Test of Use of the White Amur for Control of Problem Aquatic Plants. Report 5. Synthesis Report.

    DTIC Science & Technology

    1984-06-01

    RD-Rl45 988 AQUATIC PLANT CONTROL RESEARCH PROGRAM LARGE-SCALE 1/2 OPERATIONS MANAGEMENT ..(U) ARMY ENGINEER WATERWAYS EXPERIMENT STATION VICKSBURG MS...REPORT A-78-2 LARGE-SCALE OPERATIONS MANAGEMENT TEST OF USE OF THE WHITE AMUR FOR -, CONTROL OF PROBLEM AQUATIC PLANTS Report 5 SYNTHESIS REPORT bv Andrew...Corps of Engineers Washington, DC 20314 84 0,_1 oil.. LARGE-SCALE OPERATIONS MANAGEMENT TEST OF USE OF THE WHITE AMUR FOR CONTROL OF PROBLEM AQUATIC

  2. 40 CFR 63.3556 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... capture system and add-on control device operating limits during the performance test? 63.3556 Section 63... system and add-on control device operating limits during the performance test? During the performance... of key parameters of the valve operating system (e.g., solenoid valve operation, air pressure...

  3. 40 CFR 63.3556 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... capture system and add-on control device operating limits during the performance test? 63.3556 Section 63... system and add-on control device operating limits during the performance test? During the performance... of key parameters of the valve operating system (e.g., solenoid valve operation, air pressure...

  4. Proceedings of the Annual Meeting (14th) Aquatic Plant Control Research Planning and Operations Review, Held at Lake Eufaula, Oklahoma on 26-29 November 1979.

    DTIC Science & Technology

    1980-10-01

    Development; Problem Identification and Assessment for Aquatic Plant Management; Natural Succession of Aquatic Plants; Large-Scale Operations Management Test...of Insects and Pathogens for Control of Waterhyacinth in Louisiana; Large-Scale Operations Management Test to Evaluate Prevention Methodology for...Control of Eurasian Watermilfoil in Washington; Large-Scale Operations Management Test Using the White Amur at Lake Conway, Florida; and Aquatic Plant Control Activities in the Panama Canal Zone.

  5. 40 CFR 63.4767 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... system and add-on control device operating limits during the performance test? 63.4767 Section 63.4767... Rate with Add-on Controls Option § 63.4767 How do I establish the emission capture system and add-on control device operating limits during the performance test? During the performance test required by § 63...

  6. 40 CFR 63.4767 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... system and add-on control device operating limits during the performance test? 63.4767 Section 63.4767... Rate with Add-on Controls Option § 63.4767 How do I establish the emission capture system and add-on control device operating limits during the performance test? During the performance test required by § 63...

  7. 40 CFR 63.4167 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... system and add-on control device operating limits during the performance test? 63.4167 Section 63.4167... with Add-on Controls Option § 63.4167 How do I establish the emission capture system and add-on control device operating limits during the performance test? During the performance test required by § 63.4160...

  8. 40 CFR 63.4167 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... system and add-on control device operating limits during the performance test? 63.4167 Section 63.4167... with Add-on Controls Option § 63.4167 How do I establish the emission capture system and add-on control device operating limits during the performance test? During the performance test required by § 63.4160...

  9. 7 CFR 58.523 - Laboratory and quality control tests.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 3 2014-01-01 2014-01-01 false Laboratory and quality control tests. 58.523 Section... Service 1 Operations and Operating Procedures § 58.523 Laboratory and quality control tests. (a) Quality control tests shall be made on samples as often as necessary to determine the shelf-life and stability of...

  10. 7 CFR 58.523 - Laboratory and quality control tests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Laboratory and quality control tests. 58.523 Section... Service 1 Operations and Operating Procedures § 58.523 Laboratory and quality control tests. (a) Quality control tests shall be made on samples as often as necessary to determine the shelf-life and stability of...

  11. 7 CFR 58.523 - Laboratory and quality control tests.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 3 2013-01-01 2013-01-01 false Laboratory and quality control tests. 58.523 Section... Service 1 Operations and Operating Procedures § 58.523 Laboratory and quality control tests. (a) Quality control tests shall be made on samples as often as necessary to determine the shelf-life and stability of...

  12. 7 CFR 58.523 - Laboratory and quality control tests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 3 2011-01-01 2011-01-01 false Laboratory and quality control tests. 58.523 Section... Service 1 Operations and Operating Procedures § 58.523 Laboratory and quality control tests. (a) Quality control tests shall be made on samples as often as necessary to determine the shelf-life and stability of...

  13. 7 CFR 58.523 - Laboratory and quality control tests.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 3 2012-01-01 2012-01-01 false Laboratory and quality control tests. 58.523 Section... Service 1 Operations and Operating Procedures § 58.523 Laboratory and quality control tests. (a) Quality control tests shall be made on samples as often as necessary to determine the shelf-life and stability of...

  14. Operation Of The X-29A Digital Flight-Control System

    NASA Technical Reports Server (NTRS)

    Chacon, Vince; Mcbride, David

    1990-01-01

    Report reviews program of testing and evaluation of digital flight-control system for X-29A airplane, with emphasis on operation during tests. Topics include design of system, special electronic testing equipment designed to aid in daily operations, and aspects of testing, including detection of faults.

  15. MIUS Integration and Subsystem Test (MIST) data system

    NASA Technical Reports Server (NTRS)

    Pringle, L. M.

    1977-01-01

    A data system for use in testing integrated subsystems of a modular integrated utility system (MIUS) is presented. The MIUS integration and subsystem test (MIST) data system is reviewed from its conception through its checkout and operation as the controlling portion of the MIST facility. The MIST data system provides a real time monitoring and control function that allows for complete evaluation of the performance of the mechanical and electrical subsystems, as well as controls the operation of the various components of the system. In addition to the aforementioned capabilities, the MIST data system provides computerized control of test operations such that minimum manpower is necessary to set up, operate, and shut down subsystems during test periods.

  16. 30 CFR 250.433 - What are the diverter actuation and testing requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations...-control systems and control stations. You must also flow-test the vent lines. (a) For drilling operations... must conduct subsequent pressure tests within 7 days after the previous test. (b) For floating drilling...

  17. Large-Scale Operations Management Test of Use of the White Amur for Control of Problem Aquatic Plants. Report 2. First Year Poststocking Results. Volume VI. The Water and Sediment Quality of Lake Conway, Florida.

    DTIC Science & Technology

    1982-02-01

    AD A113 .5. ORANGE COUNTY POLLUTION CONTROL DEPT ORLANDO FL F/S 6/6 LARGE-SCALE OPERATIONS MANAGEMENT TEST OF USE OF THE WHITE AMUR-ETC(U) FEB 82 H D...Large-Scale Operations Management Test of use of the white amur for control of problem aquatic plants in Lake Conway, Fla. Report 1 of the series presents...as follows: Miller, D. 1982. "Large-Scale Operations Management Test of Use of the White Amur for Control of Problem Aquatic Plants; Report 2, First

  18. Large-Scale Operations Management Test of Use of the White Amur for Control of Problem Aquatic Plants. Report 3. Second Year Poststocking Results. Volume VI. The Water and Sediment Quality of Lake Conway, Florida.

    DTIC Science & Technology

    1982-08-01

    AD-A-11 701 ORANGE COUNTY POLLUTION CONTROL DEPT ORLANDO FL F/0 6/6 LARGE-SCALE OPERATIONS MANAGEMENT TEST OF USE OF THE WHITE AMUR--ETC(U) AUG 82 H...8217 OPERATIONS MANAGEMENT TEST OF USE OF THE WHITE AMUR FOR CONTROL -OF PROBLEM AQ.UATIC PLANTS SECOND YEAR POSTSTOCKING RESULTS Volume, Vt The Water...and Subetie) S. TYPE OF REPORT & PERIOD COVERED LARGE-SCALE OPERATIONS MANAGEMENT TEST OF USE OF Report 3 of a series THE WHITE AMUR FOR CONTROL OF

  19. Software control program for 25 kW breadboard testing. [spacecraft power supplies; high voltage batteries

    NASA Technical Reports Server (NTRS)

    Pajak, J. A.

    1981-01-01

    A data acquisition software program developed to operate in conjunction with the automated control system of the 25 kW PM Electric Power System Breadboard Test facility is described. The proram provides limited interactive control of the breadboard test while acquiring data and monitoring parameters, allowing unattended continuous operation. The breadboard test facility has two positions for operating separate configurations. The main variable in each test setup is the high voltage Ni-Cd battery.

  20. 7 CFR 58.442 - Laboratory and quality control tests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Laboratory and quality control tests. 58.442 Section... Service 1 Operations and Operating Procedures § 58.442 Laboratory and quality control tests. (a) Chemical... Methods or by other methods giving equivalent results. (b) Weight or volume control. Representative...

  1. 7 CFR 58.442 - Laboratory and quality control tests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 3 2011-01-01 2011-01-01 false Laboratory and quality control tests. 58.442 Section... Service 1 Operations and Operating Procedures § 58.442 Laboratory and quality control tests. (a) Chemical... Methods or by other methods giving equivalent results. (b) Weight or volume control. Representative...

  2. 40 CFR 63.4966 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... capture system and add-on control device operating limits during the performance test? 63.4966 Section 63... system and add-on control device operating limits during the performance test? During the performance... outlet gas temperature is the maximum operating limit for your condenser. (e) Emission capture system...

  3. 40 CFR 63.4966 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... capture system and add-on control device operating limits during the performance test? 63.4966 Section 63... system and add-on control device operating limits during the performance test? During the performance... outlet gas temperature is the maximum operating limit for your condenser. (e) Emission capture system...

  4. Self-teaching digital-computer program for fail-operational control of a turbojet engine in a sea-level test stand

    NASA Technical Reports Server (NTRS)

    Wallhagen, R. E.; Arpasi, D. J.

    1974-01-01

    The design and evaluation are described of a digital turbojet engine control which is capable of sensing catastrophic failures in either the engine rotor speed or the compressor discharge static-pressure signal and is capable of switching control modes to maintain near normal operation. The control program was developed for and tested on a turbojet engine located in a sea-level test stand. The control program is also capable of acquiring all the data that are necessary for the fail-operational control to function.

  5. 14 CFR 120.21 - Testing for alcohol.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Air Traffic Controllers § 120.21 Testing for alcohol. (a) Each air traffic control facility not...

  6. 14 CFR 120.21 - Testing for alcohol.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM Air Traffic Controllers § 120.21 Testing for alcohol. (a) Each air traffic control facility not...

  7. Summary of electric vehicle dc motor-controller tests

    NASA Technical Reports Server (NTRS)

    Mcbrien, E. F.; Tryon, H. B.

    1982-01-01

    The differences in the performance of dc motors are evaluated when operating with chopper type controllers, and when operating on direct current. The interactions between the motor and the controller which cause these differences are investigated. Motor-controlled tests provided some of the data the quantified motor efficiency variations for both ripple free and chopper modes of operation.

  8. Operational Control Procedures for the Activated Sludge Process, Part I - Observations, Part II - Control Tests.

    ERIC Educational Resources Information Center

    West, Alfred W.

    This is the first in a series of documents developed by the National Training and Operational Technology Center describing operational control procedures for the activated sludge process used in wastewater treatment. Part I of this document deals with physical observations which should be performed during each routine control test. Part II…

  9. 40 CFR 63.4767 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... system and add-on control device operating limits during the performance test? 63.4767 Section 63.4767... system and add-on control device operating limits during the performance test? During the performance... operating limits required by § 63.4692 according to this section, unless you have received approval for...

  10. 40 CFR 63.3967 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... system and add-on control device operating limits during the performance test? 63.3967 Section 63.3967... capture system and add-on control device operating limits during the performance test? During the... the operating limits required by § 63.3892 according to this section, unless you have received...

  11. 40 CFR 63.3967 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... system and add-on control device operating limits during the performance test? 63.3967 Section 63.3967... capture system and add-on control device operating limits during the performance test? During the... the operating limits required by § 63.3892 according to this section, unless you have received...

  12. 40 CFR 63.3967 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... system and add-on control device operating limits during the performance test? 63.3967 Section 63.3967... emission capture system and add-on control device operating limits during the performance test? During the... the operating limits required by § 63.3892 according to this section, unless you have received...

  13. 40 CFR 63.4167 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... capture system and add-on control device operating limits during the performance test? 63.4167 Section 63... capture system and add-on control device operating limits during the performance test? During the... the operating limits required by § 63.4092 according to this section unless you have received approval...

  14. 40 CFR 63.4567 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... capture system and add-on control device operating limits during the performance test? 63.4567 Section 63... emission capture system and add-on control device operating limits during the performance test? During the... the operating limits required by § 63.4492 according to this section, unless you have received...

  15. 40 CFR 63.3967 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... capture system and add-on control device operating limits during the performance test? 63.3967 Section 63... establish the emission capture system and add-on control device operating limits during the performance test... must establish the operating limits required by § 63.3892 according to this section, unless you have...

  16. 40 CFR 63.4167 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... capture system and add-on control device operating limits during the performance test? 63.4167 Section 63... capture system and add-on control device operating limits during the performance test? During the... the operating limits required by § 63.4092 according to this section unless you have received approval...

  17. 40 CFR 63.4767 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... capture system and add-on control device operating limits during the performance test? 63.4767 Section 63... capture system and add-on control device operating limits during the performance test? During the... the operating limits required by § 63.4692 according to this section, unless you have received...

  18. 40 CFR 63.4767 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... capture system and add-on control device operating limits during the performance test? 63.4767 Section 63... capture system and add-on control device operating limits during the performance test? During the... the operating limits required by § 63.4692 according to this section, unless you have received...

  19. 40 CFR 63.3967 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... capture system and add-on control device operating limits during the performance test? 63.3967 Section 63... establish the emission capture system and add-on control device operating limits during the performance test... must establish the operating limits required by § 63.3892 according to this section, unless you have...

  20. 40 CFR 63.4567 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... capture system and add-on control device operating limits during the performance test? 63.4567 Section 63... emission capture system and add-on control device operating limits during the performance test? During the... the operating limits required by § 63.4492 according to this section, unless you have received...

  1. 40 CFR 63.4567 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... system and add-on control device operating limits during the performance test? 63.4567 Section 63.4567... capture system and add-on control device operating limits during the performance test? During the... the operating limits required by § 63.4492 according to this section, unless you have received...

  2. 40 CFR 63.3167 - How do I establish the add-on control device operating limits during the performance test?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... device operating limits during the performance test? 63.3167 Section 63.3167 Protection of Environment... Limitations § 63.3167 How do I establish the add-on control device operating limits during the performance.... (a) Thermal oxidizers. If your add-on control device is a thermal oxidizer, establish the operating...

  3. Altitude Wind Tunnel Control Room at the Aircraft Engine Research Laboratory

    NASA Image and Video Library

    1944-07-21

    Operators in the control room for the Altitude Wind Tunnel at the National Advisory Committee for Aeronautics (NACA) Aircraft Engine Research Laboratory remotely operate a Wright R–3350 engine in the tunnel’s test section. Four of the engines were used to power the B–29 Superfortress, a critical weapon in the Pacific theater during World War II. The wind tunnel, which had been in operation for approximately six months, was the nation’s only wind tunnel capable of testing full-scale engines in simulated altitude conditions. The soundproof control room was used to operate the wind tunnel and control the engine being run in the test section. The operators worked with assistants in the adjacent Exhauster Building and Refrigeration Building to manage the large altitude simulation systems. The operator at the center console controlled the tunnel’s drive fan and operated the engine in the test section. Two sets of pneumatic levers near his right forearm controlled engine fuel flow, speed, and cooling. Panels on the opposite wall, out of view to the left, were used to manage the combustion air, refrigeration, and exhauster systems. The control panel also displayed the master air speed, altitude, and temperature gauges, as well as a plethora of pressure, temperature, and airflow readings from different locations on the engine. The operator to the right monitored the manometer tubes to determine the pressure levels. Despite just being a few feet away from the roaring engine, the control room remained quiet during the tests.

  4. Large-Scale Operations Management Test of Use of the White Amur for Control of Problem Aquatic Plants. Report 2. First Year Poststocking Results. Volume VII. A Model for Evaluation of the Response of the Lake Conway, Florida, Ecosystem to Introduction of the White Amur.

    DTIC Science & Technology

    1981-11-01

    OPERATIONS MANAGEMENT S. TYPE OF REPORT A PERIOD COVERED TEST OF THE USE OF THE WHITE AMUR FOR CONTROL OF Report 2 of a series PROBLEM AQUATIC PLANTS...111. 1981. "Large-Scale Operations Management Test of the Use of the White Amur for Control of Problem Aquatic Plants; Report 2, First Year Poststock...Al 3 LARGE-SCALE OPERATIONS MANAGEMENT TEST OF USE OF THE WHITE AMUR FOR CONTROL OF PROBLEM AQUATIC PLANTS A MODEL FOR EVALUATION OF

  5. Intelligent Launch and Range Operations Virtual Test Bed (ILRO-VTB)

    NASA Technical Reports Server (NTRS)

    Bardina, Jorge; Rajkumar, T.

    2003-01-01

    Intelligent Launch and Range Operations Virtual Test Bed (ILRO-VTB) is a real-time web-based command and control, communication, and intelligent simulation environment of ground-vehicle, launch and range operation activities. ILRO-VTB consists of a variety of simulation models combined with commercial and indigenous software developments (NASA Ames). It creates a hybrid software/hardware environment suitable for testing various integrated control system components of launch and range. The dynamic interactions of the integrated simulated control systems are not well understood. Insight into such systems can only be achieved through simulation/emulation. For that reason, NASA has established a VTB where we can learn the actual control and dynamics of designs for future space programs, including testing and performance evaluation. The current implementation of the VTB simulates the operations of a sub-orbital vehicle of mission, control, ground-vehicle engineering, launch and range operations. The present development of the test bed simulates the operations of Space Shuttle Vehicle (SSV) at NASA Kennedy Space Center. The test bed supports a wide variety of shuttle missions with ancillary modeling capabilities like weather forecasting, lightning tracker, toxic gas dispersion model, debris dispersion model, telemetry, trajectory modeling, ground operations, payload models and etc. To achieve the simulations, all models are linked using Common Object Request Broker Architecture (CORBA). The test bed provides opportunities for government, universities, researchers and industries to do a real time of shuttle launch in cyber space.

  6. Test Rack Development for Extended Operation of Advanced Stirling Convertors at NASA Glenn Research Center

    NASA Technical Reports Server (NTRS)

    Dugala, Gina M.

    2010-01-01

    The U.S. Department of Energy, Lockheed Martin Space Systems Company, Sunpower Inc., and NASA Glenn Research Center (GRC) have been developing an Advanced Stirling Radioisotope Generator (ASRG) for use as a power system on space science missions. This generator will make use of free-piston Stirling convertors to achieve higher conversion efficiency than with currently available alternatives. One part of NASA GRC's support of ASRG development includes extended operation testing of Advanced Stirling Convertors (ASCs) developed by Sunpower Inc. and GRC. The ASC consists of a free-piston Stirling engine integrated with a linear alternator. NASA GRC has been building test facilities to support extended operation of the ASCs for several years. Operation of the convertors in the test facility provides convertor performance data over an extended period of time. One part of the test facility is the test rack, which provides a means for data collection, convertor control, and safe operation. Over the years, the test rack requirements have changed. The initial ASC test rack utilized an alternating-current (AC) bus for convertor control; the ASRG Engineering Unit (EU) test rack can operate with AC bus control or with an ASC Control Unit (ACU). A new test rack is being developed to support extended operation of the ASC-E2s with higher standards of documentation, component selection, and assembly practices. This paper discusses the differences among the ASC, ASRG EU, and ASC-E2 test racks.

  7. Real time test bed development for power system operation, control and cyber security

    NASA Astrophysics Data System (ADS)

    Reddi, Ram Mohan

    The operation and control of the power system in an efficient way is important in order to keep the system secure, reliable and economical. With advancements in smart grid, several new algorithms have been developed for improved operation and control. These algorithms need to be extensively tested and validated in real time before applying to the real electric power grid. This work focuses on the development of a real time test bed for testing and validating power system control algorithms, hardware devices and cyber security vulnerability. The test bed developed utilizes several hardware components including relays, phasor measurement units, phasor data concentrator, programmable logic controllers and several software tools. Current work also integrates historian for power system monitoring and data archiving. Finally, two different power system test cases are simulated to demonstrate the applications of developed test bed. The developed test bed can also be used for power system education.

  8. Large-Scale Operations Management Test of Use of the White Amur for Control of Problem Aquatic Plants. Report 2. First Year Poststocking Results. Volume II. The Fish, Mammals, and Waterfowl of Lake Conway, Florida.

    DTIC Science & Technology

    1982-02-01

    7AD-AI3 853 ’FLORIDA SAME AND FRESH WATER FISH COMMISSION ORLANDO F/ 616 LARGE-SCALE OPERATIONS MANAGEMENT TEST OF USE OF THE WHITE AMUR--ETC(U...of a series of reports documenting a large-scale operations management test of use of the white amur for control of problem aquatic plants in Lake...M. 1982. "Large-Scale Operations Management Test of Use of the White Amur for Control of Problem Aquatic Plants; Report 2, First Year Poststock- ing

  9. Large-Scale Operations Management Test of Use of the White Amur for Control of Problem Aquatic Plants. Report 2. First Year Poststocking Results. Volume III. The Plankton and Benthos of Lake Conway, Florida,

    DTIC Science & Technology

    1981-11-01

    AD-AI09 516 FLORIDA UNIV GAINESVILLE DEPT OF ENVIRONMENTAL ENGIN--ETC F/G 6/6 LARGE-SCALE OPERATIONS MANAGEMENT TEST OF USE OF THE,WHITE AMUR--ETC(U... OPERATIONS MANAGEMENT TEST OF USE OF THE WHITE AMUR FOR CONTROL OF PROBLEM AQUATIC PLANTS Report I: Baseline Studies Volume I: The Aquatic Macropyes of...COVERED LARGE-SCALE OPERATIONS MANAGEMENT TEST OF USE OF Report 2 of a series THE WHITE AMUR FOR CONTROL OF PROBLEM AQUATIC (In 7 volumes) PLANTS

  10. Large-Scale Operations Management Test of Use of the White Amur for Control of Problem Aquatic Plants. Report 4. Third Year Poststocking Results. Volume VI. The Water and Sediment Quality of Lake Conway, Florida.

    DTIC Science & Technology

    1983-01-01

    RAI-RI247443 LARGE-SCALE OPERATIONS MANAGEMENT TEST OF USE OF THE i/i UNITE AMUR FOR CONTR.. (U) MILLER RND MILLER INC ORLANDO FL H D MILLER ET RL...LARGE-SCALE OPERATIONS MANAGEMENT TEST OF USE OF THE WHITE AMUR FOR CONTROL OF PROBLEM AQUATIC PLANTS Report 1: Baseline Studies Volume I...Boyd, J. 1983. "Large-Scale Operations Management Test of Use of the White Amur for Control of Problem Aquatic Plants; Report 4, Third Year Poststocking

  11. Comparison of three control methods for an autonomous vehicle

    NASA Astrophysics Data System (ADS)

    Deshpande, Anup; Mathur, Kovid; Hall, Ernest

    2010-01-01

    The desirability and challenge of developing a completely autonomous vehicle and the rising need for more efficient use of energy by automobiles motivate this research- a study for an optimum solution to computer control of energy efficient vehicles. The purpose of this paper is to compare three control methods - mechanical, hydraulic and electric that have been used to convert an experimental all terrain vehicle to drive by wire which would eventually act as a test bed for conducting research on various technologies for autonomous operation. Computer control of basic operations in a vehicle namely steering, braking and speed control have been implemented and will be described in this paper. The output from a 3 axis motion controller is used for this purpose. The motion controller is interfaced with a software program using WSDK (Windows Servo Design Kit) as an intermediate tuning layer for tuning and parameter settings in autonomous operation. The software program is developed in C++. The voltage signal sent to the motion controller can be varied through the control program for desired results in controlling the steering motor, activating the hydraulic brakes and varying the vehicle's speed. The vehicle has been tested for its basic functionality which includes testing of street legal operations and also a 1000 mile test while running in a hybrid mode. The vehicle has also been tested for control when it is interfaced with devices such as a keyboard, joystick and sensors under full autonomous operation. The vehicle is currently being tested in various safety studies and is being used as a test bed for experiments in control courses and research studies. The significance of this research is in providing a greater understanding of conventional driving controls and the possibility of improving automobile safety by removing human error in control of a motor vehicle.

  12. Taking advantage of ground data systems attributes to achieve quality results in testing software

    NASA Technical Reports Server (NTRS)

    Sigman, Clayton B.; Koslosky, John T.; Hageman, Barbara H.

    1994-01-01

    During the software development life cycle process, basic testing starts with the development team. At the end of the development process, an acceptance test is performed for the user to ensure that the deliverable is acceptable. Ideally, the delivery is an operational product with zero defects. However, the goal of zero defects is normally not achieved but is successful to various degrees. With the emphasis on building low cost ground support systems while maintaining a quality product, a key element in the test process is simulator capability. This paper reviews the Transportable Payload Operations Control Center (TPOCC) Advanced Spacecraft Simulator (TASS) test tool that is used in the acceptance test process for unmanned satellite operations control centers. The TASS is designed to support the development, test and operational environments of the Goddard Space Flight Center (GSFC) operations control centers. The TASS uses the same basic architecture as the operations control center. This architecture is characterized by its use of distributed processing, industry standards, commercial off-the-shelf (COTS) hardware and software components, and reusable software. The TASS uses much of the same TPOCC architecture and reusable software that the operations control center developer uses. The TASS also makes use of reusable simulator software in the mission specific versions of the TASS. Very little new software needs to be developed, mainly mission specific telemetry communication and command processing software. By taking advantage of the ground data system attributes, successful software reuse for operational systems provides the opportunity to extend the reuse concept into the test area. Consistency in test approach is a major step in achieving quality results.

  13. Ground based simulation of life sciences Spacelab experiments

    NASA Technical Reports Server (NTRS)

    Rummel, J. A.; Alexander, W. C.; Bush, W. H.; Johnston, R. S.

    1978-01-01

    The third in a series of Spacelab Mission Development tests was a joint effort of the Ames Research and Johnson Space Centers to evaluate planned operational concepts of the Space Shuttle life sciences program. A three-man crew conducted 26 experiments and 12 operational tests, utilizing both human and animal subjects. The crew lived aboard an Orbiter/Spacelab mockup for the seven-day simulation. The Spacelab was identical in geometry to the European Space Agency design, complete with removable rack sections and stowage provisions. Communications were controlled as currently planned for operational Shuttle flights. A Science Operations Remote Center at the Ames Research Center was managed by simulated Mission Control and Payload Operation Control Centers at the Johnson Space Center. This paper presents the test objectives, describes the facilities and test program, and outlines the results of this test.

  14. Intelligent launch and range operations virtual testbed (ILRO-VTB)

    NASA Astrophysics Data System (ADS)

    Bardina, Jorge; Rajkumar, Thirumalainambi

    2003-09-01

    Intelligent Launch and Range Operations Virtual Test Bed (ILRO-VTB) is a real-time web-based command and control, communication, and intelligent simulation environment of ground-vehicle, launch and range operation activities. ILRO-VTB consists of a variety of simulation models combined with commercial and indigenous software developments (NASA Ames). It creates a hybrid software/hardware environment suitable for testing various integrated control system components of launch and range. The dynamic interactions of the integrated simulated control systems are not well understood. Insight into such systems can only be achieved through simulation/emulation. For that reason, NASA has established a VTB where we can learn the actual control and dynamics of designs for future space programs, including testing and performance evaluation. The current implementation of the VTB simulates the operations of a sub-orbital vehicle of mission, control, ground-vehicle engineering, launch and range operations. The present development of the test bed simulates the operations of Space Shuttle Vehicle (SSV) at NASA Kennedy Space Center. The test bed supports a wide variety of shuttle missions with ancillary modeling capabilities like weather forecasting, lightning tracker, toxic gas dispersion model, debris dispersion model, telemetry, trajectory modeling, ground operations, payload models and etc. To achieve the simulations, all models are linked using Common Object Request Broker Architecture (CORBA). The test bed provides opportunities for government, universities, researchers and industries to do a real time of shuttle launch in cyber space.

  15. Large-Scale Operations Management Test of Use of the White Amur for Control of Problem Aquatic Plants. Report 2. First Year Poststocking Results. Volume IV. Nitrogen and Phosphorus Dynamics of the Lake Conway Ecosystem: Loading Budgets and a Dynamic Hydrologic Phosphorus Model.

    DTIC Science & Technology

    1982-08-01

    AD-AIA 700 FLORIDA UN1V GAINESVILLE DEPT OF ENVIRONMENTAL ENGIN -ETC F/G 6/6 LARGE-SCALE OPERATIONS MANAGEMENT TEST OF USE OF THE WHITE AMOR--ENL...Conway ecosystem and is part of the Large- Scale Operations Management Test (LSOMT) of the Aquatic Plant Control Research Program (APCRP) at the WES...should be cited as follows: Blancher, E. C., II, and Fellows, C. R. 1982. "Large-Scale Operations Management Test of Use of the White Amur for Control

  16. Aquatic Plant Control Research Program. Large-Scale Operations Management Test of Use of the White Amur for Control of Problem Aquatic Plants. Reports 2 and 3. First and Second Year Poststocking Results. Volume 5. The Herpetofauna of Lake Conway, Florida: Community Analysis.

    DTIC Science & Technology

    1983-07-01

    TEST CHART NATIONAL BVIREAU OF StANARS-1963- I AQUATIC PLANT CONTROL RESEARCH PROGRAM TECHNICAL REPORT A-78-2 LARGE-SCALE OPERATIONS MANAGEMENT TEST OF...Waterways Experiment Station P. 0. Box 631, Vicksburg, Miss. 39180 83 11 01 018 - I ., lit I III I | LARGE-SCALE OPERATIONS MANAGEMENT TEST OF USE OF THE...No. 3. RECIPIENT’S CATALOG NUMBER Technical Report A-78-2 Aa 1 Lj 19 ________5!1___ A. TITLE (Ad Subtitle) LARGE-SCALE OPERATIONS MANAGEMENT S. TYPE

  17. Remotely Piloted Vehicles for Experimental Flight Control Testing

    NASA Technical Reports Server (NTRS)

    Motter, Mark A.; High, James W.

    2009-01-01

    A successful flight test and training campaign of the NASA Flying Controls Testbed was conducted at Naval Outlying Field, Webster Field, MD during 2008. Both the prop and jet-powered versions of the subscale, remotely piloted testbeds were used to test representative experimental flight controllers. These testbeds were developed by the Subsonic Fixed Wing Project s emphasis on new flight test techniques. The Subsonic Fixed Wing Project is under the Fundamental Aeronautics Program of NASA's Aeronautics Research Mission Directorate (ARMD). The purpose of these testbeds is to quickly and inexpensively evaluate advanced concepts and experimental flight controls, with applications to adaptive control, system identification, novel control effectors, correlation of subscale flight tests with wind tunnel results, and autonomous operations. Flight tests and operator training were conducted during four separate series of tests during April, May, June and August 2008. Experimental controllers were engaged and disengaged during fully autonomous flight in the designated test area. Flaps and landing gear were deployed by commands from the ground control station as unanticipated disturbances. The flight tests were performed NASA personnel with support from the Maritime Unmanned Development and Operations (MUDO) team of the Naval Air Warfare Center, Aircraft Division

  18. Thermal monitoring, measurement, and control system for a Volatile Condensable Materials (VCM) test apparatus

    NASA Technical Reports Server (NTRS)

    Ives, R. E.

    1982-01-01

    A thermal monitoring and control concept is described for a volatile condensable materials (VCM) test apparatus where electric resistance heaters are employed. The technique is computer based, but requires only proportioning ON/OFF relay control signals supplied through a programmable scanner and simple quadrac power controllers. System uniqueness is derived from automatic temperature measurements and the averaging of these measurements in discrete overlapping temperature zones. Overall control tolerance proves to be better than + or - 0.5 C from room ambient temperature to 150 C. Using precisely calibrated thermocouples, the method provides excellent temperature control of a small copper VCM heating plate at 125 + or - 0.2 C over a 24 hr test period. For purposes of unattended operation, the programmable computer/controller provides a continual data printout of system operation. Real time operator command is also provided for, as is automatic shutdown of the system and operator alarm in the event of malfunction.

  19. Intelligent cruise control field operational test. Vol III, Performance of a string or cluster of ACC-equipped cars

    DOT National Transportation Integrated Search

    1998-07-01

    This report is one element of a cooperative agreement between NHTSA and UMTRI entitled Intelligent Cruise Control (ICC) Field Operational Test (FOT). It addresses the operation of a serial string or dense cluster of passenger cars equipped with a new...

  20. Surface Telerobotics: Development and Testing of a Crew Controlled Planetary Rover System

    NASA Technical Reports Server (NTRS)

    Bualat, Maria G.; Fong, Terrence; Allan, Mark; Bouyssounouse, Xavier; Cohen, Tamar; Kobayashi, Linda

    2013-01-01

    In planning for future exploration missions, architecture and study teams have made numerous assumptions about how crew can be telepresent on a planetary surface by remotely operating surface robots from space (i.e. from a flight vehicle or deep space habitat). These assumptions include estimates of technology maturity, existing technology gaps, and operational risks. These assumptions, however, have not been grounded by experimental data. Moreover, to date, no crew-controlled surface telerobot has been fully tested in a high-fidelity manner. To address these issues, we developed the "Surface Telerobotics" tests to do three things: 1) Demonstrate interactive crew control of a mobile surface telerobot in the presence of short communications delay. 2) Characterize a concept of operations for a single astronaut remotely operating a planetary rover with limited support from ground control. 3) Characterize system utilization and operator work-load for a single astronaut remotely operating a planetary rover with limited support from ground control.

  1. Engine Research Building’s Central Control Room

    NASA Image and Video Library

    1948-07-21

    Operators in the Engine Research Building’s Central Control Room at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The massive 4.25-acre Engine Research Building contains dozens of test cells, test stands, and altitude chambers. A powerful collection of compressors and exhausters located in the central portion of the basement provided process air and exhaust for these test areas. This system is connected to similar process air systems in the laboratory’s other large test facilities. The Central Control Room coordinates this activity and communicates with the local utilities. This photograph was taken just after a major upgrade to the control room in 1948. The panels on the wall contain rudimentary floor plans of the different Engine Research Building sections with indicator lights and instrumentation for each test cell. The process air equipment included 12 exhausters, four compressors, a refrigeration system, cooling water, and an exhaust system. The operators in the control room kept in contact with engineers running the process air system and those conducting the tests in the test cells. The operators also coordinated with the local power companies to make sure enough electricity was available to operate the powerful compressors and exhausters.

  2. Pseudo Dynamic Testing and Seismic Rehabilitation of Iraqi Brick, Bearing and Shear Walls

    DTIC Science & Technology

    2008-04-01

    R es ea rc h L ab or at or y Approved for public release; distribution is unlimited. ERDC/CERL TR-08-6 April 2008 Pseudo Dynamic Testing and...Model 307-50 and one Satec 100 kip servo-hydraulic actuator controlled by closed-loop servo controllers and an Instron 8800 multi-axis controller and RS...Plus testing software.* The Satec actuator was operated in displacement control mode, and the 50 kip CGS actuators were operated in modal control

  3. 242A Distributed Control System Year 2000 Acceptance Test Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    TEATS, M.C.

    1999-08-31

    This report documents acceptance test results for the 242-A Evaporator distributive control system upgrade to D/3 version 9.0-2 for year 2000 compliance. This report documents the test results obtained by acceptance testing as directed by procedure HNF-2695. This verification procedure will document the initial testing and evaluation of the potential 242-A Distributed Control System (DCS) operating difficulties across the year 2000 boundary and the calendar adjustments needed for the leap year. Baseline system performance data will be recorded using current, as-is operating system software. Data will also be collected for operating system software that has been modified to correct yearmore » 2000 problems. This verification procedure is intended to be generic such that it may be performed on any D/3{trademark} (GSE Process Solutions, Inc.) distributed control system that runs with the VMSTM (Digital Equipment Corporation) operating system. This test may be run on simulation or production systems depending upon facility status. On production systems, DCS outages will occur nine times throughout performance of the test. These outages are expected to last about 10 minutes each.« less

  4. Evaluation of the Anaheim Advanced Traffic Control System Field Operational Test : introduction and Task A : evaluation of SCOOT performance

    DOT National Transportation Integrated Search

    1999-03-01

    This report provides an overview of both the Anaheim Advanced Traffic Control System Field Operations Test (FOT) and of the technical issues associated with the evaluation of SCOOT performance during the test. The primary objective of the FOT was to ...

  5. Development of a Work Control System for Propulsion Testing at Stennis Space Center (SSC)

    NASA Technical Reports Server (NTRS)

    Messer, Elizabeth A.

    2004-01-01

    In 1996, Stennis Space Center was given management authority for all Propulsion Testing for NASA. Over the next few years several research and development (R&D) test facilities were completed and brought up to full operation in what is known as the E-Complex Test Facility at Stennis Space Center. This paper will explain the requirements and steps taken to develop the current Test Operations' electronic work control system. The Work Control System developed includes work authorization documents such as test preparation sheets, discrepancy reports, pre-test briefing reports, and test requests.

  6. Intelligent cruise control field operational test : interim report

    DOT National Transportation Integrated Search

    1997-03-01

    This interim document reports on a cooperative agreement between NHTSA and UMTRI entitled Intelligent Cruise Control (ICC) Field Operational Test (FOT). The overarching goal of the work is to characterize safety and comfort issues that are fundamenta...

  7. Flight control system design factors for applying automated testing techniques

    NASA Technical Reports Server (NTRS)

    Sitz, Joel R.; Vernon, Todd H.

    1990-01-01

    Automated validation of flight-critical embedded systems is being done at ARC Dryden Flight Research Facility. The automated testing techniques are being used to perform closed-loop validation of man-rated flight control systems. The principal design features and operational experiences of the X-29 forward-swept-wing aircraft and F-18 High Alpha Research Vehicle (HARV) automated test systems are discussed. Operationally applying automated testing techniques has accentuated flight control system features that either help or hinder the application of these techniques. The paper also discusses flight control system features which foster the use of automated testing techniques.

  8. 46 CFR 61.30-20 - Automatic control and safety tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Automatic control and safety tests. 61.30-20 Section 61... TESTS AND INSPECTIONS Tests and Inspections of Fired Thermal Fluid Heaters § 61.30-20 Automatic control and safety tests. Operational tests and checks of all safety and limit controls, combustion controls...

  9. Evaluation of glucose controllers in virtual environment: methodology and sample application.

    PubMed

    Chassin, Ludovic J; Wilinska, Malgorzata E; Hovorka, Roman

    2004-11-01

    Adaptive systems to deliver medical treatment in humans are safety-critical systems and require particular care in both the testing and the evaluation phase, which are time-consuming, costly, and confounded by ethical issues. The objective of the present work is to develop a methodology to test glucose controllers of an artificial pancreas in a simulated (virtual) environment. A virtual environment comprising a model of the carbohydrate metabolism and models of the insulin pump and the glucose sensor is employed to simulate individual glucose excursions in subjects with type 1 diabetes. The performance of the control algorithm within the virtual environment is evaluated by considering treatment and operational scenarios. The developed methodology includes two dimensions: testing in relation to specific life style conditions, i.e. fasting, post-prandial, and life style (metabolic) disturbances; and testing in relation to various operating conditions, i.e. expected operating conditions, adverse operating conditions, and system failure. We define safety and efficacy criteria and describe the measures to be taken prior to clinical testing. The use of the methodology is exemplified by tuning and evaluating a model predictive glucose controller being developed for a wearable artificial pancreas focused on fasting conditions. Our methodology to test glucose controllers in a virtual environment is instrumental in anticipating the results of real clinical tests for different physiological conditions and for different operating conditions. The thorough testing in the virtual environment reduces costs and speeds up the development process.

  10. Performance of the HIMAC beam control system using multiple-energy synchrotron operation

    NASA Astrophysics Data System (ADS)

    Mizushima, K.; Furukawa, T.; Iwata, Y.; Hara, Y.; Saotome, N.; Saraya, Y.; Tansho, R.; Sato, S.; Fujimoto, T.; Shirai, T.; Noda, K.

    2017-09-01

    Multiple-energy synchrotron operation was developed to realize fast 3D scanning irradiation for carbon-ion radiotherapy. This type of operation can output various carbon-ion beams with different energies in a single synchrotron cycle. The beam control system used in this kind of operation was developed to quickly provide the beam energy and intensity required from the irradiation control system. The performance of the system was verified by experimental tests. The system could output beams of 197 different energies in 63 s. The beam intensity could be controlled for all the output beams without large ripples or overshooting. The experimental test of irradiation for prostate cancer treatment was also successfully performed, and the test results proved that our system can greatly reduce the irradiation time.

  11. Operation CASTLE. Report of the Manager Santa Fe Operations. Extracted Version.

    DTIC Science & Technology

    Nuclear explosion testing, *Test facilities, *Management planning and control, Pacific Ocean, Eniwetok Atoll, Bikini Atoll, Marshall Islands , Organizations, Construction, Operation, Management, Logistics support, Costs

  12. Central Control Room in the Engine Research Building

    NASA Image and Video Library

    1968-11-21

    Operators in the Engine Research Building’s Central Control Room at the National Aeronautics and Space Administration (NASA) Lewis Research Center. The massive 4.25-acre Engine Research Building contains dozens of test cells, test stands, and altitude chambers. A powerful a collection of compressors and exhausters located in the central portion of the basement provides process air and exhaust for these test areas. This system is connected to similar process air systems in the laboratory’s other large test facilities. The Central Control Room coordinates this activity and communicates with the local utilities. The panels on the wall contain schematics with indicator lights and instrumentation for the atmospheric exhaust, altitude exhaust, refrigerated air, and process air systems. The process air equipment included twelve exhausters, four compressors, refrigeration system, cooling water, and an exhaust system. The operators in the control room kept in contact with engineers running the process air system and those conducting the tests in the test cells. The operators also coordinated with the local power companies to make sure enough electricity was available to operate the powerful compressors and exhausters.

  13. 40 CFR 86.230-11 - Test sequence: general requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... vehicle interior climate control system shall be operated with the interior heating system on and the air... changes (e.g., engine-off logic, idle speed operation, spark advance changes) and engine control features...) Prior to the first acceleration of the test at T=20 seconds the climate control settings shall be set as...

  14. 40 CFR 86.230-11 - Test sequence: general requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... vehicle interior climate control system shall be operated with the interior heating system on and the air... changes (e.g., engine-off logic, idle speed operation, spark advance changes) and engine control features...) Prior to the first acceleration of the test at T=20 seconds the climate control settings shall be set as...

  15. 40 CFR 86.230-11 - Test sequence: general requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... vehicle interior climate control system shall be operated with the interior heating system on and the air... changes (e.g., engine-off logic, idle speed operation, spark advance changes) and engine control features...) Prior to the first acceleration of the test at T=20 seconds the climate control settings shall be set as...

  16. 49 CFR Appendix B to Part 385 - Explanation of Safety Rating Process

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... substance test result (critical). § 382.303(a)Failing to conduct post accident testing on driver for alcohol... operational controls. These are indicative of breakdowns in a carrier's management controls. An example of a... relates to management and/or operational controls. These are indicative of breakdowns in a carrier's...

  17. 46 CFR 185.320 - Steering gear, controls, and communication system tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Steering gear, controls, and communication system tests. 185.320 Section 185.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) OPERATIONS Miscellaneous Operating Requirements § 185.320 Steering gear, controls, and communication system...

  18. 40 CFR 86.230-11 - Test sequence: general requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... vehicle interior climate control system shall be operated with the interior heating system on and the air... changes (e.g., engine-off logic, idle speed operation, spark advance changes) and engine control features...) Prior to the first acceleration of the test at T=20 seconds the climate control settings shall be set as...

  19. Determination of the Maximum Control Forces and Attainable Quickness in the Operation of Airplane Controls

    NASA Technical Reports Server (NTRS)

    Hertel, Heinrich

    1930-01-01

    This report is intended to furnish bases for load assumptions in the designing of airplane controls. The maximum control forces and quickness of operation are determined. The maximum forces for a strong pilot with normal arrangement of the controls is taken as 1.25 times the mean value obtained from tests with twelve persons. Tests with a number of persons were expected to show the maximum forces that a man of average strength can exert on the control stick in operating the elevator and ailerons and also on the rudder bar. The effect of fatigue, of duration and of the nature (static or dynamic) of the force, as also the condition of the test subject (with or without belt) were also considered.

  20. 46 CFR 130.480 - Test procedure and operations manual.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Test procedure and operations manual. 130.480 Section... VESSEL CONTROL, AND MISCELLANEOUS EQUIPMENT AND SYSTEMS Automation of Unattended Machinery Spaces § 130.480 Test procedure and operations manual. (a) A procedure for tests to be conducted on automated...

  1. Intelligent cruise control field operational test. Volume I, Technical report

    DOT National Transportation Integrated Search

    1998-05-01

    This document reports on a cooperative agreement between NHTSA and UMTRI entitled Intelligent Cruise Control (ICC) Field Operational Test (FOT). The main goal of the work is to characterize safety and comfort issues that are fundamental to human inte...

  2. Evaluation of the Anaheim Advanced Traffic Control System Field Operational Test : executive summary

    DOT National Transportation Integrated Search

    1999-07-01

    This Executive Summary provides an overview of the technical and institutional issues associated with the evaluation of the federally-sponsored Anaheim Advanced Traffic Control : System Field Operations Test. The primary FOT objective was the impleme...

  3. Quadrocopter Control Design and Flight Operation

    NASA Technical Reports Server (NTRS)

    Karwoski, Katherine

    2011-01-01

    A limiting factor in control system design and analysis for spacecraft is the inability to physically test new algorithms quickly and cheaply. Test flights of space vehicles are costly and take much preparation. As such, EV41 recently acquired a small research quadrocopter that has the ability to be a test bed for new control systems. This project focused on learning how to operate, fly, and maintain the quadrocopter, as well as developing and testing protocols for its use. In parallel to this effort, developing a model in Simulink facilitated the design and analysis of simple control systems for the quadrocopter. Software provided by the manufacturer enabled testing of the Simulink control system on the vehicle.

  4. Orbiter integrated active thermal control subsystem test

    NASA Technical Reports Server (NTRS)

    Jaax, J. R.

    1980-01-01

    Integrated subsystem level testing of the systems within the orbiter active thermal chamber capable of simulating ground, orbital, and entry temperature and pressure profiles. The test article was in a closed loop configuration that included flight type and functionally simulated protions of all ATCS components for collecting, transporting, and rejecting orbiter waste heat. Specially designed independently operating equipment simulated the transient thermal input from the cabin, payload, fuel cells, freon cold plates, hydraulic system, and space environment. Test team members using data, controls, and procedures available to a flight crew controlled the operation of the ATCS. The ATCS performance met or exceeded all thermal and operational requirements for planned and contingency mission support.

  5. Real-time simulator for helicopter rotor wind-tunnel operations

    NASA Technical Reports Server (NTRS)

    Talbot, P. D.; Peterson, R. L.; Graham, D. R.

    1986-01-01

    This paper describes the elements and operation of a simulator that is being used to train operators of the Rotor Test Apparatus (RTA) in the large-scale 40- by 80-Foot Wind Tunnel at Ames Research Center. The simulator, named TUTOR (for Tunnel Utilization Trainer with Operating Rotor) duplicates the controls of the rotor and its dynamic behavior, as well as the wind-tunnel controls. The simulation software uses a preexisting blade-element model of a four-bladed rotor with flapping and lead-lag degrees of freedom. Equations were developed for all hardware and controls of the RTA and of the wind tunnel that are normally required to perform a wind-tunnel test of a helicopter rotor. The simulator hardware consists of consoles designed to have the same appearance and functions as those in the control room of the 40- by 80-Foot Wind Tunnel, allowing input from three operators who normally establish the required operating conditions during a test run. Normal operating procedures can be practiced, as well as simulated emergencies such as rotor power failure.

  6. Temperature Control with Two Parallel Small Loop Heat Pipes for GLM Program

    NASA Technical Reports Server (NTRS)

    Khrustalev, Dmitry; Stouffer, Chuck; Ku, Jentung; Hamilton, Jon; Anderson, Mark

    2014-01-01

    The concept of temperature control of an electronic component using a single Loop Heat Pipe (LHP) is well established for Aerospace applications. Using two LHPs is often desirable for redundancy/reliability reasons or for increasing the overall heat source-sink thermal conductance. This effort elaborates on temperature controlling operation of a thermal system that includes two small ammonia LHPs thermally coupled together at the evaporator end as well as at the condenser end and operating "in parallel". A transient model of the LHP system was developed on the Thermal Desktop (TradeMark) platform to understand some fundamental details of such parallel operation of the two LHPs. Extensive thermal-vacuum testing was conducted with two thermally coupled LHPs operating simultaneously as well as with only one LHP operating at a time. This paper outlines the temperature control procedures for two LHPs operating simultaneously with widely varying sink temperatures. The test data obtained during the thermal-vacuum testing, with both LHPs running simultaneously in comparison with only one LHP operating at a time, are presented with detailed explanations.

  7. Flash evaporator systems test

    NASA Technical Reports Server (NTRS)

    Dietz, J. B.

    1976-01-01

    A flash evaporator heat rejection system representative of that proposed for the space shuttle orbiter underwent extensive system testing at the NASA Johnson Space Center (JSC) to determine its operational suitability and to establish system performance/operational characteristics for use in the shuttle system. During the tests the evaporator system demonstrated its suitability to meet the shuttle requirements by: (1) efficient operation with 90 to 95% water evaporation efficiency, (2) control of outlet temperature to 40 + or - 2 F for partial heat load operation, (3) stability of control system for rapid changes in Freon inlet temperature, and (4) repeated dormant-to-active device operation without any startup procedures.

  8. 14 CFR 33.87 - Endurance test.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... particular engine being tested. (2) Any automatic engine control that is part of the engine must control the engine during the endurance test except for operations where automatic control is normally overridden by manual control or where manual control is otherwise specified for a particular test run. (3) Except as...

  9. 14 CFR 33.87 - Endurance test.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... particular engine being tested. (2) Any automatic engine control that is part of the engine must control the engine during the endurance test except for operations where automatic control is normally overridden by manual control or where manual control is otherwise specified for a particular test run. (3) Except as...

  10. A Wireless Platform for Energy Efficient Building Control Retrofits

    DTIC Science & Technology

    2012-07-01

    operate /tune the proposed controller and maintain WSN after reasonable training Feedback from CERL facility staff/ managemen t on ease of operation and...26 4.2 FACILITY/SITE LOCATION AND OPERATIONS ...HVAC RETROFITS ...................................................................................................... 36 5.4 OPERATIONAL TESTING

  11. Intelligent cruise control field operational test. Vol II, Appendices A-F

    DOT National Transportation Integrated Search

    1998-05-01

    This document reports on a cooperative agreement between NHTSA and UMTRI entitled Intelligent Cruise Control (ICC) Field Operational Test (FOT). The main goal of the work is to characterize safety and comfort issues that are fundamental to human inte...

  12. Simulated-airline-service flight tests of laminar-flow control with perforated-surface suction system

    NASA Technical Reports Server (NTRS)

    Maddalon, Dal V.; Braslow, Albert L.

    1990-01-01

    The effectiveness and practicality of candidate leading edge systems for suction laminar flow control transport airplanes were investigated in a flight test program utilizing a modified JetStar airplane. The leading edge region imposes the most severe conditions on systems required for any type of laminar flow control. Tests of the leading edge systems, therefore, provided definitive results as to the feasibility of active laminar flow control on airplanes. The test airplane was operated under commercial transport operating procedures from various commercial airports and at various seasons of the year.

  13. Intelligent Systems Approach for Automated Identification of Individual Control Behavior of a Human Operator

    NASA Technical Reports Server (NTRS)

    Zaychik, Kirill B.; Cardullo, Frank M.

    2012-01-01

    Results have been obtained using conventional techniques to model the generic human operator?s control behavior, however little research has been done to identify an individual based on control behavior. The hypothesis investigated is that different operators exhibit different control behavior when performing a given control task. Two enhancements to existing human operator models, which allow personalization of the modeled control behavior, are presented. One enhancement accounts for the testing control signals, which are introduced by an operator for more accurate control of the system and/or to adjust the control strategy. This uses the Artificial Neural Network which can be fine-tuned to model the testing control. Another enhancement takes the form of an equiripple filter which conditions the control system power spectrum. A novel automated parameter identification technique was developed to facilitate the identification process of the parameters of the selected models. This utilizes a Genetic Algorithm based optimization engine called the Bit-Climbing Algorithm. Enhancements were validated using experimental data obtained from three different sources: the Manual Control Laboratory software experiments, Unmanned Aerial Vehicle simulation, and NASA Langley Research Center Visual Motion Simulator studies. This manuscript also addresses applying human operator models to evaluate the effectiveness of motion feedback when simulating actual pilot control behavior in a flight simulator.

  14. Evaluation of the Anaheim Advanced Traffic Control System Field Operational Test : Task B : assessment of institutional issues

    DOT National Transportation Integrated Search

    1999-07-01

    This report provides an overview of the technical and institutional issues associated with the : evaluation of the federally-sponsored Anaheim Advanced Traffic Control System Field Operations Test. The primary FOT objective was the implementation and...

  15. Control Performance of General Electric Fuel and Torque Regulator Operating on T31-3 Turbine-Propeller Engine in Sea-Level Test Stand

    NASA Technical Reports Server (NTRS)

    Oppenheimer, Frank L.; Lazar, James

    1951-01-01

    A .General Electric fuel and torque regulator was tested in conjunction with a T31-3 turbine-propeller engine in the sea-level static test stand at the NACA Lewis laboratory. The engine and control were operated over the entire speed range: 11,000 rpm, nominal flight idle, to 13,000 rpm, full power. Steady-state and transient data were recorded and are presented with a description of the four control loops being used in the system. Results of this investigation indicated that single-lever control operation was satisfactory under conditions of test. Transient data presented showed that turbine-outlet temperature did overshoot maximum operating value on acceleration but that the time duration of overshoot did not exceed approximately 1 second. This temperature limiting resulted from a control on fuel flow as a function of engine speed. Speed and torque first reached their desired values 0.4 second from the time of change in power-setting lever position. Maximum speed overshoot was 3 percent.

  16. Operators in the Plum Brook Reactor Facility Control Room

    NASA Image and Video Library

    1970-03-21

    Donald Rhodes, left, and Clyde Greer, right, monitor the operation of the National Aeronautics and Space Administration’s (NASA) Plum Brook Reactor Facility from the control room. The 60-megawatt test reactor, NASA’s only reactor, was the eighth largest test reactor in the world. The facility was built by the Lewis Research Center in the late 1950s to study the effects of radiation on different materials that could be used to construct nuclear propulsion systems for aircraft or rockets. The reactor went critical for the first time in 1961. For the next two years, two operators were on duty 24 hours per day working on the fission process until the reactor reached its full-power level in 1963. Reactor Operators were responsible for monitoring and controlling the reactor systems. Once the reactor was running under normal operating conditions, the work was relatively uneventful. Normally the reactor was kept at a designated power level within certain limits. Occasionally the operators had to increase the power for a certain test. The shift supervisor and several different people would get together and discuss the change before boosting the power. All operators were required to maintain a Reactor Operator License from the Atomic Energy Commission. The license included six months of training, an eight-hour written exam, a four-hour walkaround, and testing on the reactor controls.

  17. Development of a Work Control System for Propulsion Testing at NASA Stennis

    NASA Technical Reports Server (NTRS)

    Messer, Elizabeth A.

    2005-01-01

    In 1996 Stennis Space Center was given management authority for all Propulsion Testing for NASA. Over the next few years several research and development (R&D) test facilities were completed and brought up to full operation in what is known as the E-Complex Test Facility at Stennis Space Center. To construct, activate and operate these test facilities, a manual paper-based work control system was created. After utilizing this paper-based work control system for approximately three years, it became apparent that the research and development test area needed a better method to execute, monitor, and report on tasks required to further propulsion testing. The paper based system did not provide the engineers adequate visibility into work tasks or the tracking of testing or hardware discrepancies. This system also restricted the engineer s ability to utilize and access past knowledge and experiences given the severe schedule limitations for most R&D propulsion testing projects. Therefore a system was developed to meet the growing need of Test Operations called the Propulsion Test Directorate (PTD) Work Control System. This system is used to plan, perform, and track tasks that support testing and also to capture lessons learned while doing so.

  18. Computer assisted thermal-vacuum testing

    NASA Technical Reports Server (NTRS)

    Petrie, W.; Mikk, G.

    1977-01-01

    In testing complex systems and components under dynamic thermal-vacuum environments, it is desirable to optimize the environment control sequence in order to reduce test duration and cost. This paper describes an approach where a computer is utilized as part of the test control operation. Real time test data is made available to the computer through time-sharing terminals at appropriate time intervals. A mathematical model of the test article and environmental control equipment is then operated on using the real time data to yield current thermal status, temperature analysis, trend prediction and recommended thermal control setting changes to arrive at the required thermal condition. The data acquisition interface and the time-sharing hook-up to an IBM-370 computer is described along with a typical control program and data demonstrating its use.

  19. ETR CONTROL BUILDING, TRA647, INTERIOR. CONTROL ROOM, CONTEXTUAL VIEW. INSTRUMENT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ETR CONTROL BUILDING, TRA-647, INTERIOR. CONTROL ROOM, CONTEXTUAL VIEW. INSTRUMENT PANELS AT REAR OF OPERATOR'S CONSOLE GAVE OPERATOR STATUS OF REACTOR PERFORMANCE, COOLANT-WATER CHARACTERISTICS AND OTHER INDICATORS. WINDOWS AT RIGHT LOOKED INTO ETR BUILDING FIRST FLOOR. CAMERA FACING EAST. INL NEGATIVE NO. HD42-6. Mike Crane, Photographer, 3/2004 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  20. Development and Flight Test of an Augmented Thrust-Only Flight Control System on an MD-11 Transport Airplane

    NASA Technical Reports Server (NTRS)

    Burcham, Frank W., Jr.; Maine, Trindel A.; Burken, John J.; Pappas, Drew

    1996-01-01

    An emergency flight control system using only engine thrust, called Propulsion-Controlled Aircraft (PCA), has been developed and flight tested on an MD-11 airplane. In this thrust-only control system, pilot flight path and track commands and aircraft feedback parameters are used to control the throttles. The PCA system was installed on the MD-11 airplane using software modifications to existing computers. Flight test results show that the PCA system can be used to fly to an airport and safely land a transport airplane with an inoperative flight control system. In up-and-away operation, the PCA system served as an acceptable autopilot capable of extended flight over a range of speeds and altitudes. The PCA approaches, go-arounds, and three landings without the use of any non-nal flight controls have been demonstrated, including instrument landing system-coupled hands-off landings. The PCA operation was used to recover from an upset condition. In addition, PCA was tested at altitude with all three hydraulic systems turned off. This paper reviews the principles of throttles-only flight control; describes the MD-11 airplane and systems; and discusses PCA system development, operation, flight testing, and pilot comments.

  1. 46 CFR 61.30-20 - Automatic control and safety tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Automatic control and safety tests. 61.30-20 Section 61.30-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PERIODIC... and safety tests. Operational tests and checks of all safety and limit controls, combustion controls...

  2. 46 CFR 61.30-20 - Automatic control and safety tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Automatic control and safety tests. 61.30-20 Section 61.30-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PERIODIC... and safety tests. Operational tests and checks of all safety and limit controls, combustion controls...

  3. 46 CFR 61.30-20 - Automatic control and safety tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Automatic control and safety tests. 61.30-20 Section 61.30-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PERIODIC... and safety tests. Operational tests and checks of all safety and limit controls, combustion controls...

  4. 7 CFR 58.928 - Quality control tests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 3 2011-01-01 2011-01-01 false Quality control tests. 58.928 Section 58.928... Procedures § 58.928 Quality control tests. All dairy products and other ingredients shall be subject to inspection for quality and condition throughout each processing operation. Quality control tests shall be...

  5. 7 CFR 58.335 - Quality control tests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 3 2011-01-01 2011-01-01 false Quality control tests. 58.335 Section 58.335... Procedures § 58.335 Quality control tests. All milk, cream and related products are subject to inspection for quality and condition throughout each processing operation. Quality control tests shall be made on flow...

  6. Evaluating the effectiveness of biometric access control systems

    NASA Astrophysics Data System (ADS)

    Lively, Valerie M.

    2005-05-01

    This paper describes the contribution by the National Safe Skies Alliance (Safe Skies) in operational testing of biometric access control systems under the guidance of the Transportation Security Administration (TSA). Safe Skies has been conducting operational tests of biometric access control systems on behalf of the TSA for approximately four years. The majority of this testing has occurred at the McGhee Tyson Airport (TYS) in Knoxville, Tennessee. Twelve separate biometric devices - eight fingerprint, facial, iris, hand geometry, and fingerprint and iris, have been tested to date. Tests were conducted at a TYS administrative door and different airports to evaluate the access control device under normal, abnormal, and attempt-to-defeat conditions.

  7. Operational Control Procedures for the Activated Sludge Process: Appendix.

    ERIC Educational Resources Information Center

    West, Alfred W.

    This document is the appendix for a series of documents developed by the National Training and Operational Technology Center describing operational control procedures for the activated sludge process used in wastewater treatment. Categories discussed include: control test data, trend charts, moving averages, semi-logarithmic plots, probability…

  8. 49 CFR 236.587 - Departure test.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Departure test. 236.587 Section 236.587..., Train Control and Cab Signal Systems Inspection and Tests; Locomotive § 236.587 Departure test. (a) The...: (1) Operation over track elements; (2) Operation over test circuit; (3) Use of portable test...

  9. 49 CFR 236.587 - Departure test.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Departure test. 236.587 Section 236.587..., Train Control and Cab Signal Systems Inspection and Tests; Locomotive § 236.587 Departure test. (a) The...: (1) Operation over track elements; (2) Operation over test circuit; (3) Use of portable test...

  10. 40 CFR 63.1512 - Performance test/compliance demonstration requirements and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... operator must conduct a performance test to measure THC and D/F emissions at the outlet of the control.../decoating kiln. The owner or operator must conduct performance tests to measure emissions of THC, D/F, HCl... operating temperature of each afterburner every 15 minutes during the THC and D/F performance tests; (ii...

  11. 40 CFR 63.1512 - Performance test/compliance demonstration requirements and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... operator must conduct a performance test to measure THC and D/F emissions at the outlet of the control.../decoating kiln. The owner or operator must conduct performance tests to measure emissions of THC, D/F, HCl... operating temperature of each afterburner every 15 minutes during the THC and D/F performance tests; (ii...

  12. International Space Station Alpha trace contaminant control subassembly life test report

    NASA Technical Reports Server (NTRS)

    Tatara, J. D.; Perry, J. L.

    1995-01-01

    The Environmental Control and Life Support System (ECLSS) Life Test Program (ELTP) began with Trace Contaminant Control Subassembly (TCCS) Life Testing on November 9, 1992, at 0745. The purpose of the test, as stated in the NASA document 'Requirements for Trace Contaminant Control Subassembly High Temperature Catalytic Oxidizer Life Testing (Revision A)' was to 'provide for the long duration operation of the ECLSS TCCS HTCO (High Temperature Catalytic Oxidizer) at normal operating conditions... (and thus)... to determine the useful life of ECLSS hardware for use on long duration manned space missions.' Specifically, the test was designed to demonstrate thermal stability of the HTCO catalyst. The report details TCCS stability throughout the test. Graphs are included to aid in evaluating trends and subsystem anomalies. The report summarizes activities through the final day of testing, January 17, 1995 (test day 762).

  13. Loop Heat Pipe Operation Using Heat Source Temperature for Set Point Control

    NASA Technical Reports Server (NTRS)

    Ku, Jentung; Paiva, Kleber; Mantelli, Marcia

    2011-01-01

    The LHP operating temperature is governed by the saturation temperature of its reservoir. Controlling the reservoir saturation temperature is commonly accomplished by cold biasing the reservoir and using electrical heaters to provide the required control power. Using this method, the loop operating temperature can be controlled within +/- 0.5K. However, because of the thermal resistance that exists between the heat source and the LHP evaporator, the heat source temperature will vary with its heat output even if LHP operating temperature is kept constant. Since maintaining a constant heat source temperature is of most interest, a question often raised is whether the heat source temperature can be used for LHP set point temperature control. A test program with a miniature LHP has been carried out to investigate the effects on the LHP operation when the control temperature sensor is placed on the heat source instead of the reservoir. In these tests, the LHP reservoir is cold-biased and is heated by a control heater. Tests results show that it is feasible to use the heat source temperature for feedback control of the LHP operation. Using this method, the heat source temperature can be maintained within a tight range for moderate and high powers. At low powers, however, temperature oscillations may occur due to interactions among the reservoir control heater power, the heat source mass, and the heat output from the heat source. In addition, the heat source temperature could temporarily deviate from its set point during fast thermal transients. The implication is that more sophisticated feedback control algorithms need to be implemented for LHP transient operation when the heat source temperature is used for feedback control.

  14. 46 CFR 185.320 - Steering gear, controls, and communication system tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Steering gear, controls, and communication system tests. 185.320 Section 185.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) OPERATIONS Miscellaneous Operating Requirements § 185.320 Steering...

  15. Field operational test of the Freightliner/Meritor WABCO roll stability advisor and control at Praxair

    DOT National Transportation Integrated Search

    2003-08-01

    This document reports on the conduct and findings of a naturalistic field operational test (FOT) of the Freightliner/Meritor WABCO Roll Stability Advisor and Control (RA&C). The broad intent of RA&C is to reduce the risk of rollover by improving driv...

  16. Control of Wind Tunnel Operations Using Neural Net Interpretation of Flow Visualization Records

    NASA Technical Reports Server (NTRS)

    Buggele, Alvin E.; Decker, Arthur J.

    1994-01-01

    Neural net control of operations in a small subsonic/transonic/supersonic wind tunnel at Lewis Research Center is discussed. The tunnel and the layout for neural net control or control by other parallel processing techniques are described. The tunnel is an affordable, multiuser platform for testing instrumentation and components, as well as parallel processing and control strategies. Neural nets have already been tested on archival schlieren and holographic visualizations from this tunnel as well as recent supersonic and transonic shadowgraph. This paper discusses the performance of neural nets for interpreting shadowgraph images in connection with a recent exercise for tuning the tunnel in a subsonic/transonic cascade mode of operation. That mode was operated for performing wake surveys in connection with NASA's Advanced Subsonic Technology (AST) noise reduction program. The shadowgraph was presented to the neural nets as 60 by 60 pixel arrays. The outputs were tunnel parameters such as valve settings or tunnel state identifiers for selected tunnel operating points, conditions, or states. The neural nets were very sensitive, perhaps too sensitive, to shadowgraph pattern detail. However, the nets exhibited good immunity to variations in brightness, to noise, and to changes in contrast. The nets are fast enough so that ten or more can be combined per control operation to interpret flow visualization data, point sensor data, and model calculations. The pattern sensitivity of the nets will be utilized and tested to control wind tunnel operations at Mach 2.0 based on shock wave patterns.

  17. Advanced Stirling Convertor Dual Convertor Controller Testing at NASA Glenn Research Center in the Radioisotope Power Systems System Integration Laboratory

    NASA Technical Reports Server (NTRS)

    Dugala, Gina M.; Taylor, Linda M.; Bell, Mark E.; Dolce, James L.; Fraeman, Martin; Frankford, David P.

    2015-01-01

    NASA Glenn Research Center developed a nonnuclear representation of a Radioisotope Power System (RPS) consisting of a pair of Advanced Stirling Convertors (ASCs), Dual Convertor Controller (DCC) EMs (engineering models) 2 and 3, and associated support equipment, which were tested in the Radioisotope Power Systems System Integration Laboratory (RSIL). The DCC was designed by the Johns Hopkins University Applied Physics Laboratory (JHU/APL) to actively control a pair of ASCs. The first phase of testing included a Dual Advanced Stirling Convertor Simulator (DASCS), which was developed by JHU/APL and simulates the operation and electrical behavior of a pair of ASCs in real time via a combination of hardware and software. RSIL provides insight into the electrical interactions between a representative radioisotope power generator, its associated control schemes, and realistic electric system loads. The first phase of integration testing included the following spacecraft bus configurations: capacitive, battery, and super-capacitor. A load profile, created based on data from several missions, tested the RPS's and RSIL's ability to maintain operation during load demands above and below the power provided by the RPS. The integration testing also confirmed the DCC's ability to disconnect from the spacecraft when the bus voltage dipped below 22 volts or exceeded 36 volts. Once operation was verified with the DASCS, the tests were repeated with actual operating ASCs. The goal of this integration testing was to verify operation of the DCC when connected to a spacecraft and to verify the functionality of the newly designed RSIL. The results of these tests are presented in this paper.

  18. Representing operations procedures using temporal dependency networks

    NASA Technical Reports Server (NTRS)

    Fayyad, Kristina E.; Cooper, Lynne P.

    1993-01-01

    DSN Link Monitor & Control (LMC) operations consist primarily of executing procedures to configure, calibrate, test, and operate a communications link between an interplanetary spacecraft and its mission control center. Currently the LMC operators are responsible for integrating procedures into an end-to-end series of steps. The research presented in this paper is investigating new ways of specifying operations procedures that incorporate the insight of operations, engineering, and science personnel to improve mission operations. The paper describes the rationale for using Temporal Dependency Networks (TDN's) to represent the procedures, a description of how the data is acquired, and the knowledge engineering effort required to represent operations procedures. Results of operational tests of this concept, as implemented in the LMC Operator Assistant Prototype (LMCOA), are also presented.

  19. Testing and checkout experiences in the National Transonic Facility since becoming operational

    NASA Technical Reports Server (NTRS)

    Bruce, W. E., Jr.; Gloss, B. B.; Mckinney, L. W.

    1988-01-01

    The U.S. National Transonic Facility, constructed by NASA to meet the national needs for High Reynolds Number Testing, has been operational in a checkout and test mode since the operational readiness review (ORR) in late 1984. During this time, there have been problems centered around the effect of large temperature excursions on the mechanical movement of large components, the reliable performance of instrumentation systems, and an unexpected moisture problem with dry insulation. The more significant efforts since the ORR are reviewed and NTF status concerning hardware, instrumentation and process controls systems, operating constraints imposed by the cryogenic environment, and data quality and process controls is summarized.

  20. Development and Operation of an Automatic Rotor Trim Control System for use During the UH-60 Individual Blade Control Wind Tunnel Test

    NASA Technical Reports Server (NTRS)

    Theodore, Colin R.

    2010-01-01

    A full-scale wind tunnel test to evaluate the effects of Individual Blade Control (IBC) on the performance, vibration, noise and loads of a UH-60A rotor was recently completed in the National Full-Scale Aerodynamics Complex (NFAC) 40- by 80-Foot Wind Tunnel [1]. A key component of this wind tunnel test was an automatic rotor trim control system that allowed the rotor trim state to be set more precisely, quickly and repeatably than was possible with the rotor operator setting the trim condition manually. The trim control system was also able to maintain the desired trim condition through changes in IBC actuation both in open- and closed-loop IBC modes, and through long-period transients in wind tunnel flow. This ability of the trim control system to automatically set and maintain a steady rotor trim enabled the effects of different IBC inputs to be compared at common trim conditions and to perform these tests quickly without requiring the rotor operator to re-trim the rotor. The trim control system described in this paper was developed specifically for use during the IBC wind tunnel test

  1. 40 CFR 63.9324 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... capture system and add-on control device operating limits during the performance test? 63.9324 Section 63... Requirements § 63.9324 How do I establish the emission capture system and add-on control device operating... the operating limits required by § 63.9302 according to this section, unless you have received...

  2. 40 CFR 63.3556 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... system and add-on control device operating limits during the performance test? 63.3556 Section 63.3556... of key parameters of the valve operating system (e.g., solenoid valve operation, air pressure.../outlet Concentration Option § 63.3556 How do I establish the emission capture system and add-on control...

  3. 40 CFR 63.9324 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... capture system and add-on control device operating limits during the performance test? 63.9324 Section 63... Requirements § 63.9324 How do I establish the emission capture system and add-on control device operating... the operating limits required by § 63.9302 according to this section, unless you have received...

  4. 40 CFR 63.9324 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... capture system and add-on control device operating limits during the performance test? 63.9324 Section 63... Requirements § 63.9324 How do I establish the emission capture system and add-on control device operating... the operating limits required by § 63.9302 according to this section, unless you have received...

  5. 40 CFR 63.9324 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... capture system and add-on control device operating limits during the performance test? 63.9324 Section 63... Requirements § 63.9324 How do I establish the emission capture system and add-on control device operating... the operating limits required by § 63.9302 according to this section, unless you have received...

  6. 40 CFR 63.9324 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... capture system and add-on control device operating limits during the performance test? 63.9324 Section 63... Requirements § 63.9324 How do I establish the emission capture system and add-on control device operating... the operating limits required by § 63.9302 according to this section, unless you have received...

  7. 40 CFR 63.3556 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... system and add-on control device operating limits during the performance test? 63.3556 Section 63.3556... of key parameters of the valve operating system (e.g., solenoid valve operation, air pressure.../outlet Concentration Option § 63.3556 How do I establish the emission capture system and add-on control...

  8. 40 CFR 63.3556 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... system and add-on control device operating limits during the performance test? 63.3556 Section 63.3556... of key parameters of the valve operating system (e.g., solenoid valve operation, air pressure... Control Efficiency/outlet Concentration Option § 63.3556 How do I establish the emission capture system...

  9. Using new aggregation operators in rule-based intelligent control

    NASA Technical Reports Server (NTRS)

    Berenji, Hamid R.; Chen, Yung-Yaw; Yager, Ronald R.

    1990-01-01

    A new aggregation operator is applied in the design of an approximate reasoning-based controller. The ordered weighted averaging (OWA) operator has the property of lying between the And function and the Or function used in previous fuzzy set reasoning systems. It is shown here that, by applying OWA operators, more generalized types of control rules, which may include linguistic quantifiers such as Many and Most, can be developed. The new aggregation operators, as tested in a cart-pole balancing control problem, illustrate improved performance when compared with existing fuzzy control aggregation schemes.

  10. Initial closed operation of the CELSS Test Facility Engineering Development Unit

    NASA Technical Reports Server (NTRS)

    Kliss, M.; Blackwell, C.; Zografos, A.; Drews, M.; MacElroy, R.; McKenna, R.; Heyenga, A. G.

    2003-01-01

    As part of the NASA Advanced Life Support Flight Program, a Controlled Ecological Life Support System (CELSS) Test Facility Engineering Development Unit has been constructed and is undergoing initial operational testing at NASA Ames Research Center. The Engineering Development Unit (EDU) is a tightly closed, stringently controlled, ground-based testbed which provides a broad range of environmental conditions under which a variety of CELSS higher plant crops can be grown. Although the EDU was developed primarily to provide near-term engineering data and a realistic determination of the subsystem and system requirements necessary for the fabrication of a comparable flight unit, the EDU has also provided a means to evaluate plant crop productivity and physiology under controlled conditions. This paper describes the initial closed operational testing of the EDU, with emphasis on the hardware performance capabilities. Measured performance data during a 28-day closed operation period are compared with the specified functional requirements, and an example of inferring crop growth parameters from the test data is presented. Plans for future science and technology testing are also discussed. Published by Elsevier Science Ltd on behalf of COSPAR.

  11. 40 CFR 792.105 - Test, control, and reference substance characterization.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... or concomitantly according to written standard operating procedures, which provide for periodic...) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Test, Control, and Reference...

  12. 40 CFR 792.105 - Test, control, and reference substance characterization.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... or concomitantly according to written standard operating procedures, which provide for periodic...) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Test, Control, and Reference...

  13. 40 CFR 792.105 - Test, control, and reference substance characterization.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... or concomitantly according to written standard operating procedures, which provide for periodic...) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Test, Control, and Reference...

  14. 40 CFR 792.105 - Test, control, and reference substance characterization.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... or concomitantly according to written standard operating procedures, which provide for periodic...) TOXIC SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Test, Control, and Reference...

  15. Solar electric propulsion thrust subsystem development

    NASA Technical Reports Server (NTRS)

    Masek, T. D.

    1973-01-01

    The Solar Electric Propulsion System developed under this program was designed to demonstrate all the thrust subsystem functions needed on an unmanned planetary vehicle. The demonstration included operation of the basic elements, power matching input and output voltage regulation, three-axis thrust vector control, subsystem automatic control including failure detection and correction capability (using a PDP-11 computer), operation of critical elements in thermal-vacuum-, zero-gravity-type propellant storage, and data outputs from all subsystem elements. The subsystem elements, functions, unique features, and test setup are described. General features and capabilities of the test-support data system are also presented. The test program culminated in a 1500-h computer-controlled, system-functional demonstration. This included simultaneous operation of two thruster/power conditioner sets. The results of this testing phase satisfied all the program goals.

  16. International Space Station alpha remote manipulator system workstation controls test report

    NASA Astrophysics Data System (ADS)

    Ehrenstrom, William A.; Swaney, Colin; Forrester, Patrick

    1994-05-01

    Previous development testing for the space station remote manipulator system workstation controls determined the need for hardware controls for the emergency stop, brakes on/off, and some camera functions. This report documents the results of an evaluation to further determine control implementation requirements, requested by the Canadian Space Agency (CSA), to close outstanding review item discrepancies. This test was conducted at the Johnson Space Center's Space Station Mockup and Trainer Facility in Houston, Texas, with nine NASA astronauts and one CSA astronaut as operators. This test evaluated camera iris and focus, back-up drive, latching end effector release, and autosequence controls using several types of hardware and software implementations. Recommendations resulting from the testing included providing guarded hardware buttons to prevent accidental actuation, providing autosequence controls and back-up drive controls on a dedicated hardware control panel, and that 'latch on/latch off', or on-screen software, controls not be considered. Generally, the operators preferred hardware controls although other control implementations were acceptable. The results of this evaluation will be used along with further testing to define specific requirements for the workstation design.

  17. International Space Station alpha remote manipulator system workstation controls test report

    NASA Technical Reports Server (NTRS)

    Ehrenstrom, William A.; Swaney, Colin; Forrester, Patrick

    1994-01-01

    Previous development testing for the space station remote manipulator system workstation controls determined the need for hardware controls for the emergency stop, brakes on/off, and some camera functions. This report documents the results of an evaluation to further determine control implementation requirements, requested by the Canadian Space Agency (CSA), to close outstanding review item discrepancies. This test was conducted at the Johnson Space Center's Space Station Mockup and Trainer Facility in Houston, Texas, with nine NASA astronauts and one CSA astronaut as operators. This test evaluated camera iris and focus, back-up drive, latching end effector release, and autosequence controls using several types of hardware and software implementations. Recommendations resulting from the testing included providing guarded hardware buttons to prevent accidental actuation, providing autosequence controls and back-up drive controls on a dedicated hardware control panel, and that 'latch on/latch off', or on-screen software, controls not be considered. Generally, the operators preferred hardware controls although other control implementations were acceptable. The results of this evaluation will be used along with further testing to define specific requirements for the workstation design.

  18. Induction graphitizing furnace acceptance test report

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The induction furnace was designed to provide the controlled temperature and environment required for the post-cure, carbonization and graphitization processes for the fabrication of a fibrous graphite NERVA nozzle extension. The acceptance testing required six tests and a total operating time of 298 hrs. Low temperature mode operations, 120 to 850 C, were completed in one test run. High temperature mode operations, 120 to 2750 C, were completed during five tests.

  19. Neural net controller for inlet pressure control of rocket engine testing

    NASA Technical Reports Server (NTRS)

    Trevino, Luis C.

    1994-01-01

    Many dynamic systems operate in select operating regions, each exhibiting characteristic modes of behavior. It is traditional to employ standard adjustable gain proportional-integral-derivative (PID) loops in such systems where no apriori model information is available. However, for controlling inlet pressure for rocket engine testing, problems in fine tuning, disturbance accommodation, and control gains for new profile operating regions (for research and development) are typically encountered. Because of the capability of capturing I/O peculiarities, using NETS, a back propagation trained neural network is specified. For select operating regions, the neural network controller is simulated to be as robust as the PID controller. For a comparative analysis, the higher order moment neural array (HOMNA) method is used to specify a second neural controller by extracting critical exemplars from the I/O data set. Furthermore, using the critical exemplars from the HOMNA method, a third neural controller is developed using NETS back propagation algorithm. All controllers are benchmarked against each other.

  20. Initial Flight Test of the Production Support Flight Control Computers at NASA Dryden Flight Research Center

    NASA Technical Reports Server (NTRS)

    Carter, John; Stephenson, Mark

    1999-01-01

    The NASA Dryden Flight Research Center has completed the initial flight test of a modified set of F/A-18 flight control computers that gives the aircraft a research control law capability. The production support flight control computers (PSFCC) provide an increased capability for flight research in the control law, handling qualities, and flight systems areas. The PSFCC feature a research flight control processor that is "piggybacked" onto the baseline F/A-18 flight control system. This research processor allows for pilot selection of research control law operation in flight. To validate flight operation, a replication of a standard F/A-18 control law was programmed into the research processor and flight-tested over a limited envelope. This paper provides a brief description of the system, summarizes the initial flight test of the PSFCC, and describes future experiments for the PSFCC.

  1. Syn-Fuel reciprocating charge pump improvement program. Quarterly technical project report, April-June 1984

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1984-01-01

    Major accomplishments during the second quarter of 1984 were completion of the Diaphragm Separation Seal clear liquid testing, and initiation of Phase III Field Testing. Diaphragm operational testing was conducted on a clear water test loop. The test goals were to ensure; mechanical reliability of the Diaphragm Seal, safe operation with simulated component failure, and proper operation of the Diaphragm Buffer Volume Control System. This latter system is essential in controlling the phasing of the diaphragm with its driving plunger. These tests were completed successfully. All operational problems were solved. However, it must be emphasized that the Diaphragm Seal wouldmore » be damaged by allowing the pump to operate in a cavitating condition for an extended period of time. A change in the Field Test phase of the program was made regarding choice of field test site. There is no operating Syn-Fuel pilot plant capable of inexpensively producing the slurry stream required for the reciprocating pump testing. The Field Tests will now be conducted by first testing the prototype pump and separation seals in an ambient temperature sand water slurry. This will determine resistence to abrasive wear and determine any operation problems at pressure over a lengthy period of time. After successful conclusion of these tests the pump and seals will be operated with a high temperature oil, but without solids, to identify any problems associated with thermal gradients, thermal shock and differential growth. After successful completion of the high temperature clean oil tests the pump will be deemed ready for in-line installation at a designated Syn-Fuel pilot plant. The above approach avoids the expense and complications of a separate hot slurry test loop. It also reduces risk of operational problems while in-line at the pilot plant. 5 figs.« less

  2. 46 CFR 61.30-20 - Automatic control and safety tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Automatic control and safety tests. 61.30-20 Section 61.30-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PERIODIC TESTS AND INSPECTIONS Tests and Inspections of Fired Thermal Fluid Heaters § 61.30-20 Automatic control and safety tests. Operational tests and check...

  3. Engineering and simulation of life sciences Spacelab experiments

    NASA Technical Reports Server (NTRS)

    Johnston, R. S.; Bush, W. H. Jr; Rummel, J. A.; Alexander, W. C.

    1979-01-01

    The third in a series of Spacelab Mission Development tests was conducted at the Johnson (correction of Johnston) Space Center as a part of the development of Life Sciences experiments for the Space Shuttle era. The latest test was a joint effort of the Ames Research and Johnson Space Centers and utilized animals and men for study. The basic objective of this test was to evaluate the operational concepts planned for the Space Shuttle life science payloads program. A three-man crew (Mission Specialist and two Payload Specialists) conducted 26 experiments and 12 operational tests, which were selected for this 7-day mission simulation. The crew lived on board a simulated Orbiter/Spacelab mockup 24 hr a day. The Orbiter section contained the mid deck crew quarters area, complete with sleeping, galley and waste management provisions. The Spacelab was identical in geometry to the European Space Agency Spacelab design, complete with removable rack sections and stowage provisions. Communications between the crewmen and support personnel were configured and controlled as currently planned for operational shuttle flights. For this test a Science Operations Remote Center was manned at the Ames Research Center and was managed by simulated Mission Control and Payload Operation Control Centers at the Johnson Space Center. This paper presents the test objectives, description of the facilities and test program, and the results of this test.

  4. Integrated Test Approach

    NASA Technical Reports Server (NTRS)

    Cotton, Will; Liechty, John

    2015-01-01

    This paper describes a testing methodology undertaken on the Facilities Development and Operations Contract (FDOC) by Lockheed Martin. The methodology was defined with the intent of reducing project schedule time to enable NASA's Johnson Space Center (JSC) to be able to deliver the Mission Control Center (MCC) 21 project as quickly as possible. 21 represents the 21st century where NASA JSC is updating its control center with new technology and operational concepts in order to support NASA customers wanting to use control center assets to support space vehicle operations. In collaboration with the NASA customer, a new test concept was conceived early during MCC21 project planning with the goal of reducing project delivery time. One enabler that could help reduce delivery time was testing. Within the project, testing was performed by two entities, software development responsible for subsystem testing and system test responsible for system integration testing. The MCC21 project took a deliberate review of testing to determine how it could be performed differently to realize an overall reduction in test time to support the goal of a more rapid project delivery.

  5. A Description of the Development, Capabilities, and Operational Status of the Test SLATE Data Acquisition System at the National Transonic Facility

    NASA Technical Reports Server (NTRS)

    Cramer, Christopher J.; Wright, James D.; Simmons, Scott A.; Bobbitt, Lynn E.; DeMoss, Joshua A.

    2015-01-01

    The paper will present a brief background of the previous data acquisition system at the National Transonic Facility (NTF) and the reasoning and goals behind the upgrade to the current Test SLATE (Test Software Laboratory and Automated Testing Environments) data acquisition system. The components, performance characteristics, and layout of the Test SLATE system within the NTF control room will be discussed. The development, testing, and integration of Test SLATE within NTF operations will be detailed. The operational capabilities of the system will be outlined including: test setup, instrumentation calibration, automatic test sequencer setup, data recording, communication between data and facility control systems, real time display monitoring, and data reduction. The current operational status of the Test SLATE system and its performance during recent NTF testing will be highlighted including high-speed, frame-by-frame data acquisition with conditional sampling post-processing applied. The paper concludes with current development work on the system including the capability for real-time conditional sampling during data acquisition and further efficiency enhancements to the wind tunnel testing process.

  6. Voltage controlled current source

    DOEpatents

    Casne, Gregory M.

    1992-01-01

    A seven decade, voltage controlled current source is described for use in testing intermediate range nuclear instruments that covers the entire test current range of from 10 picoamperes to 100 microamperes. High accuracy is obtained throughout the entire seven decades of output current with circuitry that includes a coordinated switching scheme responsive to the input signal from a hybrid computer to control the input voltage to an antilog amplifier, and to selectively connect a resistance to the antilog amplifier output to provide a continuous output current source as a function of a preset range of input voltage. An operator controlled switch provides current adjustment for operation in either a real-time simulation test mode or a time response test mode.

  7. 40 CFR 63.3546 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... system and add-on control device operating limits during the performance test? 63.3546 Section 63.3546... of key parameters of the valve operating system (e.g., solenoid valve operation, air pressure... minimum operating limit for that specific capture device or system of multiple capture devices. The...

  8. 40 CFR 63.3546 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... capture system and add-on control device operating limits during the performance test? 63.3546 Section 63... of key parameters of the valve operating system (e.g., solenoid valve operation, air pressure... minimum operating limit for that specific capture device or system of multiple capture devices. The...

  9. 40 CFR 63.3546 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... capture system and add-on control device operating limits during the performance test? 63.3546 Section 63... of key parameters of the valve operating system (e.g., solenoid valve operation, air pressure... minimum operating limit for that specific capture device or system of multiple capture devices. The...

  10. Real-time closed-loop simulation and upset evaluation of control systems in harsh electromagnetic environments

    NASA Technical Reports Server (NTRS)

    Belcastro, Celeste M.

    1989-01-01

    Digital control systems for applications such as aircraft avionics and multibody systems must maintain adequate control integrity in adverse as well as nominal operating conditions. For example, control systems for advanced aircraft, and especially those with relaxed static stability, will be critical to flight and will, therefore, have very high reliability specifications which must be met regardless of operating conditions. In addition, multibody systems such as robotic manipulators performing critical functions must have control systems capable of robust performance in any operating environment in order to complete the assigned task reliably. Severe operating conditions for electronic control systems can result from electromagnetic disturbances caused by lightning, high energy radio frequency (HERF) transmitters, and nuclear electromagnetic pulses (NEMP). For this reason, techniques must be developed to evaluate the integrity of the control system in adverse operating environments. The most difficult and illusive perturbations to computer-based control systems that can be caused by an electromagnetic environment (EME) are functional error modes that involve no component damage. These error modes are collectively known as upset, can occur simultaneously in all of the channels of a redundant control system, and are software dependent. Upset studies performed to date have not addressed the assessment of fault tolerant systems and do not involve the evaluation of a control system operating in a closed-loop with the plant. A methodology for performing a real-time simulation of the closed-loop dynamics of a fault tolerant control system with a simulated plant operating in an electromagnetically harsh environment is presented. In particular, considerations for performing upset tests on the controller are discussed. Some of these considerations are the generation and coupling of analog signals representative of electromagnetic disturbances to a control system under test, analog data acquisition, and digital data acquisition from fault tolerant systems. In addition, a case study of an upset test methodology for a fault tolerant electromagnetic aircraft engine control system is presented.

  11. Operational evaluation of initial data link air traffic control services, Vol. 1

    DOT National Transportation Integrated Search

    1990-02-01

    This report details the results of an operational evaluation of Initial Data Link Air Traffic Control (ATC) Services. The Operational Evaluation was conducted at the Federal Aviation Administration (FAA) Technical Center utilizing the Data Link test ...

  12. Testing of the Advanced Stirling Radioisotope Generator Engineering Unit at NASA Glenn Research Center

    NASA Technical Reports Server (NTRS)

    Lewandowski, Edward J.

    2013-01-01

    The Advanced Stirling Radioisotope Generator (ASRG) is a high-efficiency generator being developed for potential use on a Discovery 12 space mission. Lockheed Martin designed and fabricated the ASRG Engineering Unit (EU) under contract to the Department of Energy. This unit was delivered to NASA Glenn Research Center in 2008 and has been undergoing extended operation testing to generate long-term performance data for an integrated system. It has also been used for tests to characterize generator operation while varying control parameters and system inputs, both when controlled with an alternating current (AC) bus and with a digital controller. The ASRG EU currently has over 27,000 hours of operation. This paper summarizes all of the tests that have been conducted on the ASRG EU over the past 3 years and provides an overview of the test results and what was learned.

  13. Laboratory test methodology for evaluating the effects of electromagnetic disturbances on fault-tolerant control systems

    NASA Technical Reports Server (NTRS)

    Belcastro, Celeste M.

    1989-01-01

    Control systems for advanced aircraft, especially those with relaxed static stability, will be critical to flight and will, therefore, have very high reliability specifications which must be met for adverse as well as nominal operating conditions. Adverse conditions can result from electromagnetic disturbances caused by lightning, high energy radio frequency transmitters, and nuclear electromagnetic pulses. Tools and techniques must be developed to verify the integrity of the control system in adverse operating conditions. The most difficult and illusive perturbations to computer based control systems caused by an electromagnetic environment (EME) are functional error modes that involve no component damage. These error modes are collectively known as upset, can occur simultaneously in all of the channels of a redundant control system, and are software dependent. A methodology is presented for performing upset tests on a multichannel control system and considerations are discussed for the design of upset tests to be conducted in the lab on fault tolerant control systems operating in a closed loop with a simulated plant.

  14. Reactor Simulator Testing Overview

    NASA Technical Reports Server (NTRS)

    Schoenfeld, Michael P.

    2013-01-01

    Test Objectives Summary: a) Verify operation of the core simulator, the instrumentation & control system, and the ground support gas and vacuum test equipment. b) Examine cooling & heat regeneration performance of the cold trap purification. c) Test the ALIP pump at voltages beyond 120V to see if the targeted mass flow rate of 1.75 kg/s can be obtained in the RxSim. Testing Highlights: a) Gas and vacuum ground support test equipment performed effectively for operations (NaK fill, loop pressurization, and NaK drain). b) Instrumentation & Control system effectively controlled loop temperature and flow rates or pump voltage to targeted settings and ramped within prescribed constraints. It effectively interacted with reactor simulator control model and defaulted back to temperature control mode if the transient fluctuations didn't dampen. c) Cold trap design was able to obtain the targeted cold temperature of 480 K. An outlet temperature of 636 K was obtained which was lower than the predicted 750 K but 156 K higher than the minimum temperature indicating the design provided some heat regeneration. d) ALIP produce a maximum flow rate of 1.53 kg/s at 800 K when operated at 150 V and 53 Hz.

  15. Test, Control and Monitor System (TCMS) operations plan

    NASA Technical Reports Server (NTRS)

    Macfarlane, C. K.; Conroy, M. P.

    1993-01-01

    The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.

  16. Altitude Wind Tunnel Control Room

    NASA Image and Video Library

    1945-05-21

    Researchers at the National Advisory Committee for Aeronautics (NACA) Aircraft Engine Research Laboratory monitor a ramjet's performance in the Altitude Wind Tunnel from the control room. The soundproof control room was just a few feet from the tunnel’s 20-foot-diameter test section. In the control room, the operators could control all aspects of the tunnel’s operation, including the air density, temperature, and speed. They also operated the engine or test article in the test section by controlling the angle-of-attack, speed, power, and other parameters. The men in this photograph are monitoring the engine’s thrust and lift. A NACA-designed 20-inch-diameter ramjet was installed in the tunnel in May 1945. Thrust figures from these runs were compared with drag data from tests of scale models in small supersonic tunnels to verify the ramjet’s feasibility. The tunnel was used to analyze the ramjet’s overall performance up to altitudes of 47,000 feet and speeds to Mach 1.84. The researchers found that an increase in altitude caused a reduction in the engine’s horsepower and identified optimal flameholder configurations.

  17. Artificial intelligence in a mission operations and satellite test environment

    NASA Technical Reports Server (NTRS)

    Busse, Carl

    1988-01-01

    A Generic Mission Operations System using Expert System technology to demonstrate the potential of Artificial Intelligence (AI) automated monitor and control functions in a Mission Operations and Satellite Test environment will be developed at the National Aeronautics and Space Administration (NASA) Jet Propulsion Laboratory (JPL). Expert system techniques in a real time operation environment are being studied and applied to science and engineering data processing. Advanced decommutation schemes and intelligent display technology will be examined to develop imaginative improvements in rapid interpretation and distribution of information. The Generic Payload Operations Control Center (GPOCC) will demonstrate improved data handling accuracy, flexibility, and responsiveness in a complex mission environment. The ultimate goal is to automate repetitious mission operations, instrument, and satellite test functions by the applications of expert system technology and artificial intelligence resources and to enhance the level of man-machine sophistication.

  18. Control of Technology Transfer at JPL

    NASA Technical Reports Server (NTRS)

    Oliver, Ronald

    2006-01-01

    Controlled Technology: 1) Design: preliminary or critical design data, schematics, technical flow charts, SNV code/diagnostics, logic flow diagrams, wirelist, ICDs, detailed specifications or requirements. 2) Development: constraints, computations, configurations, technical analyses, acceptance criteria, anomaly resolution, detailed test plans, detailed technical proposals. 3) Production: process or how-to: assemble, operated, repair, maintain, modify. 4) Manufacturing: technical instructions, specific parts, specific materials, specific qualities, specific processes, specific flow. 5) Operations: how-to operate, contingency or standard operating plans, Ops handbooks. 6) Repair: repair instructions, troubleshooting schemes, detailed schematics. 7) Test: specific procedures, data, analysis, detailed test plan and retest plans, detailed anomaly resolutions, detailed failure causes and corrective actions, troubleshooting, trended test data, flight readiness data. 8) Maintenance: maintenance schedules and plans, methods for regular upkeep, overhaul instructions. 9) Modification: modification instructions, upgrades kit parts, including software

  19. Advanced Stirling Convertor Dual Convertor Controller Testing at NASA Glenn Research Center in the Radioisotope Power Systems System Integration Laboratory

    NASA Technical Reports Server (NTRS)

    Dugala, Gina M.; Taylor, Linda M.; Bell, Mark E.; Dolce, James L.; Fraeman, Martin; Frankford, David P.

    2015-01-01

    NASA Glenn Research Center (GRC) developed a non-nuclear representation of a Radioisotope Power System (RPS) consisting of a pair of Advanced Stirling Convertors (ASC), a Dual Convertor Controller (DCC) EM (engineering model) 2 & 3, and associated support equipment, which were tested in the Radioisotope Power Systems System Integration Laboratory (RSIL). The DCC was designed by the Johns Hopkins University/Applied Physics Laboratory (JHU/APL) to actively control a pair of Advanced Stirling Convertors (ASC). The first phase of testing included a Dual Advanced Stirling Convertor Simulator (DASCS) which was developed by JHU/APL and simulates the operation and electrical behavior of a pair of ASC's in real time via a combination of hardware and software. RSIL provides insight into the electrical interactions between a representative radioisotope power generator, its associated control schemes, and realistic electric system loads. The first phase of integration testing included the following spacecraft bus configurations: capacitive, battery, and supercapacitor. A load profile, created based on data from several missions, tested the RPS and RSIL ability to maintain operation during load demands above and below the power provided by the RPS. The integration testing also confirmed the DCC's ability to disconnect from the spacecraft when the bus voltage dipped below 22 V or exceeded 36 V. Once operation was verified with the DASCS, the tests were repeated with actual operating ASC's. The goal of this integration testing was to verify operation of the DCC when connected to a spacecraft and to verify the functionality of the newly designed RSIL. The results of these tests are presented in this paper.

  20. 40 CFR 160.105 - Test, control, and reference substance characterization.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... concomitantly according to written standard operating procedures, which provide for periodic analysis of each...) PESTICIDE PROGRAMS GOOD LABORATORY PRACTICE STANDARDS Test, Control, and Reference Substances § 160.105 Test...

  1. 40 CFR 160.105 - Test, control, and reference substance characterization.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... concomitantly according to written standard operating procedures, which provide for periodic analysis of each...) PESTICIDE PROGRAMS GOOD LABORATORY PRACTICE STANDARDS Test, Control, and Reference Substances § 160.105 Test...

  2. 40 CFR 160.105 - Test, control, and reference substance characterization.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... concomitantly according to written standard operating procedures, which provide for periodic analysis of each...) PESTICIDE PROGRAMS GOOD LABORATORY PRACTICE STANDARDS Test, Control, and Reference Substances § 160.105 Test...

  3. 40 CFR 160.105 - Test, control, and reference substance characterization.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... concomitantly according to written standard operating procedures, which provide for periodic analysis of each...) PESTICIDE PROGRAMS GOOD LABORATORY PRACTICE STANDARDS Test, Control, and Reference Substances § 160.105 Test...

  4. 40 CFR 160.105 - Test, control, and reference substance characterization.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... concomitantly according to written standard operating procedures, which provide for periodic analysis of each...) PESTICIDE PROGRAMS GOOD LABORATORY PRACTICE STANDARDS Test, Control, and Reference Substances § 160.105 Test...

  5. 40 CFR 63.3546 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... system and add-on control device operating limits during the performance test? 63.3546 Section 63.3546... device or system of multiple capture devices. The average duct static pressure is the maximum operating... Add-on Controls Option § 63.3546 How do I establish the emission capture system and add-on control...

  6. 40 CFR 63.3546 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... system and add-on control device operating limits during the performance test? 63.3546 Section 63.3546... device or system of multiple capture devices. The average duct static pressure is the maximum operating... Add-on Controls Option § 63.3546 How do I establish the emission capture system and add-on control...

  7. 40 CFR 63.4966 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... system and add-on control device operating limits during the performance test? 63.4966 Section 63.4966... outlet gas temperature is the maximum operating limit for your condenser. (e) Emission capture system... with Add-on Controls Option § 63.4966 How do I establish the emission capture system and add-on control...

  8. 40 CFR 63.4966 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... system and add-on control device operating limits during the performance test? 63.4966 Section 63.4966... outlet gas temperature is the maximum operating limit for your condenser. (e) Emission capture system... with Add-on Controls Option § 63.4966 How do I establish the emission capture system and add-on control...

  9. Operational considerations for laminar flow aircraft

    NASA Technical Reports Server (NTRS)

    Maddalon, Dal V.; Wagner, Richard D.

    1986-01-01

    Considerable progress has been made in the development of laminar flow technology for commercial transports during the NASA Aircraft Energy Efficiency (ACEE) laminar flow program. Practical, operational laminar flow control (LFC) systems have been designed, fabricated, and are undergoing flight testing. New materials, fabrication methods, analysis techniques, and design concepts were developed and show much promise. The laminar flow control systems now being flight tested on the NASA Jetstar aircraft are complemented by natural laminar flow flight tests to be accomplished with the F-14 variable-sweep transition flight experiment. An overview of some operational aspects of this exciting program is given.

  10. B-52 control configured vehicles: Flight test results

    NASA Technical Reports Server (NTRS)

    Arnold, J. I.; Murphy, F. B.

    1976-01-01

    Recently completed B-52 Control Configured Vehicles (CCV) flight testing is summarized, and results are compared to analytical predictions. Results are presented for five CCV system concepts: ride control, maneuver load control, flutter mode control, augmented stability, and fatigue reduction. Test results confirm analytical predictions and show that CCV system concepts achieve performance goals when operated individually or collectively.

  11. Development and Flight Test of an Emergency Flight Control System Using Only Engine Thrust on an MD-11 Transport Airplane

    NASA Technical Reports Server (NTRS)

    Burcham, Frank W., Jr.; Burken, John J.; Maine, Trindel A.; Fullerton, C. Gordon

    1997-01-01

    An emergency flight control system that uses only engine thrust, called the propulsion-controlled aircraft (PCA) system, was developed and flight tested on an MD-11 airplane. The PCA system is a thrust-only control system, which augments pilot flightpath and track commands with aircraft feedback parameters to control engine thrust. The PCA system was implemented on the MD-11 airplane using only software modifications to existing computers. Results of a 25-hr flight test show that the PCA system can be used to fly to an airport and safely land a transport airplane with an inoperative flight control system. In up-and-away operation, the PCA system served as an acceptable autopilot capable of extended flight over a range of speeds, altitudes, and configurations. PCA approaches, go-arounds, and three landings without the use of any normal flight controls were demonstrated, including ILS-coupled hands-off landings. PCA operation was used to recover from an upset condition. The PCA system was also tested at altitude with all three hydraulic systems turned off. This paper reviews the principles of throttles-only flight control, a history of accidents or incidents in which some or all flight controls were lost, the MD-11 airplane and its systems, PCA system development, operation, flight testing, and pilot comments.

  12. Mod-2 wind turbine system development. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The development of the MOD-2 wind turbine through acceptance testing and initial operational evaluation is documented. Pitch control hydraulic system, yaw control system, drive train, electrical power station, control system, operations and maintenance experience, and availability are discussed.

  13. Reactor Simulator Testing Overview

    NASA Technical Reports Server (NTRS)

    Schoenfeld, Michael P.

    2013-01-01

    OBJECTIVE: Integrated testing of the TDU components TESTING SUMMARY: a) Verify the operation of the core simulator, the instrumentation and control system, and the ground support gas and vacuum test equipment. b) Thermal test heat regeneration design aspect of a cold trap purification filter. c) Pump performance test at pump voltages up to 150 V (targeted mass flow rate of 1.75 kg/s was not obtained in the RxSim at the originally constrained voltage of 120 V). TESTING HIGHLIGHTS: a) Gas and vacuum ground support test equipment performed effectively for NaK fill, loop pressurization, and NaK drain operations. b) Instrumentation and control system effectively controlled loop temperature and flow rates or pump voltage to targeted settings. c) Cold trap design was able to obtain the targeted cold temperature of 480 K. An outlet temperature of 636 K was obtained which was lower than the predicted 750 K but 156 K higher than the cold temperature indicating the design provided some heat regeneration. d) ALIP produce a maximum flow rate of 1.53 kg/s at 800 K when operated at 150 V and 53 Hz.

  14. Loop Heat Pipe Transient Behavior Using Heat Source Temperature for Set Point Control with Thermoelectric Converter on Reservoir

    NASA Technical Reports Server (NTRS)

    Ku, Jentung; Paiva, Kleber; Mantelli, Marcia

    2011-01-01

    The LHP operating temperature is governed by the saturation temperature of its reservoir. Controlling the reservoir saturation temperature is commonly done by cold biasing the reservoir and using electrical heaters to provide the required control power. With this method, the loop operating temperature can be controlled within 0.5K or better. However, because the thermal resistance that exists between the heat source and the LHP evaporator, the heat source temperature will vary with its heat output even if the LHP operating temperature is kept constant. Since maintaining a constant heat source temperature is of most interest, a question often raised is whether the heat source temperature can be used for LHP set point temperature control. A test program with a miniature LHP was carried out to investigate the effects on the LHP operation when the control temperature sensor was placed on the heat source instead of the reservoir. In these tests, the LHP reservoir was cold-biased and was heated by a control heater. Test results show that it was feasible to use the heat source temperature for feedback control of the LHP operation. In particular, when a thermoelectric converter was used as the reservoir control heater, the heat source temperature could be maintained within a tight range using a proportional-integral-derivative or on/off control algorithm. Moreover, because the TEC could provide both heating and cooling to the reservoir, temperature oscillations during fast transients such as loop startup could be eliminated or substantially reduced when compared to using an electrical heater as the control heater.

  15. Test/score/report: Simulation techniques for automating the test process

    NASA Technical Reports Server (NTRS)

    Hageman, Barbara H.; Sigman, Clayton B.; Koslosky, John T.

    1994-01-01

    A Test/Score/Report capability is currently being developed for the Transportable Payload Operations Control Center (TPOCC) Advanced Spacecraft Simulator (TASS) system which will automate testing of the Goddard Space Flight Center (GSFC) Payload Operations Control Center (POCC) and Mission Operations Center (MOC) software in three areas: telemetry decommutation, spacecraft command processing, and spacecraft memory load and dump processing. Automated computer control of the acceptance test process is one of the primary goals of a test team. With the proper simulation tools and user interface, the task of acceptance testing, regression testing, and repeatability of specific test procedures of a ground data system can be a simpler task. Ideally, the goal for complete automation would be to plug the operational deliverable into the simulator, press the start button, execute the test procedure, accumulate and analyze the data, score the results, and report the results to the test team along with a go/no recommendation to the test team. In practice, this may not be possible because of inadequate test tools, pressures of schedules, limited resources, etc. Most tests are accomplished using a certain degree of automation and test procedures that are labor intensive. This paper discusses some simulation techniques that can improve the automation of the test process. The TASS system tests the POCC/MOC software and provides a score based on the test results. The TASS system displays statistics on the success of the POCC/MOC system processing in each of the three areas as well as event messages pertaining to the Test/Score/Report processing. The TASS system also provides formatted reports documenting each step performed during the tests and the results of each step. A prototype of the Test/Score/Report capability is available and currently being used to test some POCC/MOC software deliveries. When this capability is fully operational it should greatly reduce the time necessary to test a POCC/MOC software delivery, as well as improve the quality of the test process.

  16. Operator procedure verification with a rapidly reconfigurable simulator

    NASA Technical Reports Server (NTRS)

    Iwasaki, Yumi; Engelmore, Robert; Fehr, Gary; Fikes, Richard

    1994-01-01

    Generating and testing procedures for controlling spacecraft subsystems composed of electro-mechanical and computationally realized elements has become a very difficult task. Before a spacecraft can be flown, mission controllers must envision a great variety of situations the flight crew may encounter during a mission and carefully construct procedures for operating the spacecraft in each possible situation. If, despite extensive pre-compilation of control procedures, an unforeseen situation arises during a mission, the mission controller must generate a new procedure for the flight crew in a limited amount of time. In such situations, the mission controller cannot systematically consider and test alternative procedures against models of the system being controlled, because the available simulator is too large and complex to reconfigure, run, and analyze quickly. A rapidly reconfigurable simulation environment that can execute a control procedure and show its effects on system behavior would greatly facilitate generation and testing of control procedures both before and during a mission. The How Things Work project at Stanford University has developed a system called DME (Device Modeling Environment) for modeling and simulating the behavior of electromechanical devices. DME was designed to facilitate model formulation and behavior simulation of device behavior including both continuous and discrete phenomena. We are currently extending DME for use in testing operator procedures, and we have built a knowledge base for modeling the Reaction Control System (RCS) of the space shuttle as a testbed. We believe that DME can facilitate design of operator procedures by providing mission controllers with a simulation environment that meets all these requirements.

  17. 46 CFR 61.35-3 - Required tests and checks.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... controls must control and cycle the unit in the proper manner and sequence. Proper prepurge, ignition...) Limit controls. Shutdown caused by the limit controls must be verified. (9) Water level controls. Water level controls must be tested by slowly lowering the water level in the boiler. Each operating water...

  18. 46 CFR 61.35-3 - Required tests and checks.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... controls must control and cycle the unit in the proper manner and sequence. Proper prepurge, ignition...) Limit controls. Shutdown caused by the limit controls must be verified. (9) Water level controls. Water level controls must be tested by slowly lowering the water level in the boiler. Each operating water...

  19. 46 CFR 61.35-3 - Required tests and checks.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... controls must control and cycle the unit in the proper manner and sequence. Proper prepurge, ignition...) Limit controls. Shutdown caused by the limit controls must be verified. (9) Water level controls. Water level controls must be tested by slowly lowering the water level in the boiler. Each operating water...

  20. 46 CFR 61.35-3 - Required tests and checks.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... controls must control and cycle the unit in the proper manner and sequence. Proper prepurge, ignition...) Limit controls. Shutdown caused by the limit controls must be verified. (9) Water level controls. Water level controls must be tested by slowly lowering the water level in the boiler. Each operating water...

  1. Digital electronic engine control history

    NASA Technical Reports Server (NTRS)

    Putnam, T. W.

    1984-01-01

    Full authority digital electronic engine controls (DEECs) were studied, developed, and ground tested because of projected benefits in operability, improved performance, reduced maintenance, improved reliability, and lower life cycle costs. The issues of operability and improved performance, however, are assessed in a flight test program. The DEEC on a F100 engine in an F-15 aircraft was demonstrated and evaluated. The events leading to the flight test program are chronicled and important management and technical results are identified.

  2. Twelfth Annual Conference on Manual Control

    NASA Technical Reports Server (NTRS)

    Wempe, T. E.

    1976-01-01

    Main topics discussed cover multi-task decision making, attention allocation and workload measurement, displays and controls, nonvisual displays, tracking and other psychomotor tasks, automobile driving, handling qualities and pilot ratings, remote manipulation, system identification, control models, and motion and visual cues. Sixty-five papers are included with presentations on results of analytical studies to develop and evaluate human operator models for a range of control task, vehicle dynamics and display situations; results of tests of physiological control systems and applications to medical problems; and on results of simulator and flight tests to determine display, control and dynamics effects on operator performance and workload for aircraft, automobile, and remote control systems.

  3. Airborne Data Link Operational Evaluation Test Plan

    DOT National Transportation Integrated Search

    1993-08-01

    This plan describes an end-to-end study of operational concepts and procedures associated with the introduction of electronic data communications between flight crews and air traffic controllers. Full performance controllers from : terminal facilitie...

  4. 40 CFR 792.90 - Animal and other test system care.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Testing Facilities Operation § 792.90 Animal and other test system care. (a) There shall be standard operating procedures for the housing... adult terrestrial amphibians used in laboratory procedures that require manipulations and observations...

  5. 40 CFR 792.90 - Animal and other test system care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Testing Facilities Operation § 792.90 Animal and other test system care. (a) There shall be standard operating procedures for the housing... adult terrestrial amphibians used in laboratory procedures that require manipulations and observations...

  6. 40 CFR 792.90 - Animal and other test system care.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Testing Facilities Operation § 792.90 Animal and other test system care. (a) There shall be standard operating procedures for the housing... adult terrestrial amphibians used in laboratory procedures that require manipulations and observations...

  7. 40 CFR 792.90 - Animal and other test system care.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Testing Facilities Operation § 792.90 Animal and other test system care. (a) There shall be standard operating procedures for the housing... adult terrestrial amphibians used in laboratory procedures that require manipulations and observations...

  8. 40 CFR 792.90 - Animal and other test system care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SUBSTANCES CONTROL ACT (CONTINUED) GOOD LABORATORY PRACTICE STANDARDS Testing Facilities Operation § 792.90 Animal and other test system care. (a) There shall be standard operating procedures for the housing... adult terrestrial amphibians used in laboratory procedures that require manipulations and observations...

  9. Results from Testing Crew-Controlled Surface Telerobotics on the International Space Station

    NASA Technical Reports Server (NTRS)

    Bualat, Maria; Schreckenghost, Debra; Pacis, Estrellina; Fong, Terrence; Kalar, Donald; Beutter, Brent

    2014-01-01

    During Summer 2013, the Intelligent Robotics Group at NASA Ames Research Center conducted a series of tests to examine how astronauts in the International Space Station (ISS) can remotely operate a planetary rover. The tests simulated portions of a proposed lunar mission, in which an astronaut in lunar orbit would remotely operate a planetary rover to deploy a radio telescope on the lunar far side. Over the course of Expedition 36, three ISS astronauts remotely operated the NASA "K10" planetary rover in an analogue lunar terrain located at the NASA Ames Research Center in California. The astronauts used a "Space Station Computer" (crew laptop), a combination of supervisory control (command sequencing) and manual control (discrete commanding), and Ku-band data communications to command and monitor K10 for 11 hours. In this paper, we present and analyze test results, summarize user feedback, and describe directions for future research.

  10. 14 CFR 120.1 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM... part 135 of this chapter, all air traffic control facilities not operated by the FAA or by or under... implement a drug and alcohol testing program under this part. (d) All contractors who elect to implement a...

  11. 40 CFR 63.4360 - What are the general requirements for performance tests?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... obtain a waiver of the performance test according to the provisions in § 63.7(h). (1) Representative web... under representative operating conditions for the web coating/printing or dyeing/finishing operation...) Representative emission capture system and add-on control device operating conditions. You must conduct the...

  12. 14 CFR 120.1 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM... part 135 of this chapter, all air traffic control facilities not operated by the FAA or by or under... implement a drug and alcohol testing program under this part. (d) All contractors who elect to implement a...

  13. Galileo attitude and articulation control subsystem closed loop testing

    NASA Technical Reports Server (NTRS)

    Lembeck, M. F.; Pignatano, N. D.

    1983-01-01

    In order to ensure the reliable operation of the Attitude and Articulation Control Subsystem (AACS) which will guide the Galileo spacecraft on its two and one-half year journey to Jupiter, the AACS is being rigorously tested. The primary objectives of the test program are the verification of the AACS's form, fit, and function, especially with regard to subsystem external interfaces and the functional operation of the flight software. Attention is presently given to the Galileo Closed Loop Test System, which simulates the dynamic and 'visual' flight environment for AACS components in the laboratory.

  14. Prototype test article verification of the Space Station Freedom active thermal control system microgravity performance

    NASA Technical Reports Server (NTRS)

    Chen, I. Y.; Ungar, E. K.; Lee, D. Y.; Beckstrom, P. S.

    1993-01-01

    To verify the on-orbit operation of the Space Station Freedom (SSF) two-phase external Active Thermal Control System (ATCS), a test and verification program will be performed prior to flight. The first system level test of the ATCS is the Prototype Test Article (PTA) test that will be performed in early 1994. All ATCS loops will be represented by prototypical components and the line sizes and lengths will be representative of the flight system. In this paper, the SSF ATCS and a portion of its verification process are described. The PTA design and the analytical methods that were used to quantify the gravity effects on PTA operation are detailed. Finally, the gravity effects are listed, and the applicability of the 1-g PTA test results to the validation of on-orbit ATCS operation is discussed.

  15. Successful completion of a cyclic ground test of a mercury ion auxiliary propulsion system

    NASA Technical Reports Server (NTRS)

    Francisco, David R.; Low, Charles A., Jr.; Power, John L.

    1988-01-01

    An engineering model Ion Auxiliary Propulsion System (IAPS) 8-cm thruster (S/N 905) has completed a life test at NASA Lewis Research Center. The mercury ion thruster successfully completed and exceeded the test goals of 2557 on/off cycles and 7057 hr of operation at full thrust. The final 1200 cycles and 3600 hr of the life test were conducted using an engineering model of the IAPS power electronics unit (PEU) and breadboard digital controller and interface unit (DCIU). This portion of the test is described in this paper with a charted history of thruster operating parameters and off-normal events. Performance and operating characteristics were constant throughout the test with only minor variations. The engineering model power electronics unit operated without malfunction; the flight software in the digital controller and interface unit was exercised and verified. Post-test inspection of the thruster revealed facility enhanced accelerator grid erosion but overall the thruster was in good condition. It was concluded that the thruster performance was not drastically degraded by time or cycles. Additional cyclic testing is currently under consideration.

  16. Successful completion of a cyclic ground test of a mercury Ion Auxiliary Propulsion System

    NASA Technical Reports Server (NTRS)

    Francisco, David R.; Low, Charles A., Jr.; Power, John L.

    1988-01-01

    An engineering model Ion Auxiliary Propulsion System (IAPS) 8-cm thruster (S/N 905) has completed a life test at NASA Lewis Research Center. The mercury ion thruster successfully completed and exceeded the test goals of 2557 on/off cycles and 7057 hr of operation at full thrust. The final 1200 cycles and 3600 hr of the life test were conducted using an engineering model of the IAPS power electronics unit (PEU) and breadboard digital controller and interface unit (DCIU). This portion of the test is described in this paper with a charted history of thruster operating parameters and off-normal events. Performance and operating characteristics were constant throughout the test with only minor variations. The engineering model power electronics unit operated without malfunction; the flight software in the digital controller and interface unit was exercised and verified. Post-test inspection of the thruster revealed facility enhanced accelerator grid erosion but overall the thruster was in good condition. It was concluded that the thruster performance was not drastically degraded by time or cycles. Additional cyclic testing is currently under consideration.

  17. 14 CFR 27.927 - Additional tests.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... controlled by the pilot under normal operating conditions (such as where the primary engine power control is accomplished through the flight control), the following test must be made: (1) Under conditions associated with... the torque must be absorbed by the rotors to be installed, except that other ground or flight test...

  18. 14 CFR 27.927 - Additional tests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... controlled by the pilot under normal operating conditions (such as where the primary engine power control is accomplished through the flight control), the following test must be made: (1) Under conditions associated with... the torque must be absorbed by the rotors to be installed, except that other ground or flight test...

  19. 49 CFR 236.586 - Daily or after trip test.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Inspection and Tests; Locomotive § 236.586 Daily or after trip test..., each locomotive equipped with an automatic cab signal or train stop or train control device operating...

  20. 49 CFR 236.586 - Daily or after trip test.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Inspection and Tests; Locomotive § 236.586 Daily or after trip test..., each locomotive equipped with an automatic cab signal or train stop or train control device operating...

  1. Speed control for a mobile robot

    NASA Astrophysics Data System (ADS)

    Kolli, Kaylan C.; Mallikarjun, Sreeram; Kola, Krishnamohan; Hall, Ernest L.

    1997-09-01

    Automated guided vehicles (AGVs) have many potential applications in manufacturing, medicine, space and defense. The purpose of this paper is to describe exploratory research on the design of a speed control for a modular autonomous mobile robot controller. The speed control of the traction motor is essential for safe operation of a mobile robot. The challenges of autonomous operation of a vehicle require safe, runaway and collision free operation. A mobile robot test-bed has been constructed using a golf cart base. The computer controlled speed control has been implemented and works with guidance provided by vision system and obstacle avoidance using ultrasonic sensors systems. A 486 computer through a 3- axis motion controller supervises the speed control. The traction motor is controlled via the computer by an EV-1 speed control. Testing of the system was done both in the lab and on an outside course with positive results. This design is a prototype and suggestions for improvements are also given. The autonomous speed controller is applicable for any computer controlled electric drive mobile vehicle.

  2. Development and testing of laser Doppler system components for wake vortex monitoring. Volume 1: Scanner development, laboratory and field testing and system modeling

    NASA Technical Reports Server (NTRS)

    Wilson, D. J.; Krause, M. C.; Coffey, E. W.; Huang, C. C.; Edwards, B. B.; Shrider, K. R.; Jetton, J. L.; Morrison, L. K.

    1974-01-01

    A servo-controlled range/elevation scanner for the laser Doppler velocimeter (LDV) was developed and tested in the field to assess its performance in detecting and monitoring aircraft trailing vortices in an airport environment. The elevation scanner provides a capability to manually point the LDV telescope at operator chosen angles from 3.2 deg. to 89.6 deg within 0.2 deg, or to automatically scan the units between operator chosen limits at operator chosen rates of 0.1 Hz to 0.5 Hz. The range scanner provides a capability to manually adjust the focal point of the system from a range of 32 meters to a range of 896 meters under operator control, or to scan between operator chosen limits and at rates from 0.1 Hz to 6.9 Hz. The scanner controls are designed to allow simulataneous range and elevation scanning so as to provide finger scan patterns, arc scan patterns, and vertical line scan patterns. The development and testing of the unit is discussed, along with a fluid dynamic model of the wake vortex developed in a laser Doppler vortex sensor simulation program.

  3. Developing a space network interface simulator: The NTS approach

    NASA Technical Reports Server (NTRS)

    Hendrzak, Gary E.

    1993-01-01

    This paper describes the approach used to redevelop the Network Control Center (NCC) Test System (NTS), a hardware and software facility designed to make testing of the NCC Data System (NCCDS) software efficient, effective, and as rigorous as possible prior to operational use. The NTS transmits and receives network message traffic in real-time. Data transfer rates and message content are strictly controlled and are identical to that of the operational systems. NTS minimizes the need for costly and time-consuming testing with the actual external entities (e.g., the Hubble Space Telescope (HST) Payload Operations Control Center (POCC) and the White Sands Ground Terminal). Discussed are activities associated with the development of the NTS, lessons learned throughout the project's lifecycle, and resulting productivity and quality increases.

  4. Detection of gas leakage

    DOEpatents

    Thornberg, Steven [Peralta, NM; Brown, Jason [Albuquerque, NM

    2012-06-19

    A method of detecting leaks and measuring volumes as well as an apparatus, the Power-free Pump Module (PPM), that is a self-contained leak test and volume measurement apparatus that requires no external sources of electrical power during leak testing or volume measurement, where the invention is a portable, pneumatically-controlled instrument capable of generating a vacuum, calibrating volumes, and performing quantitative leak tests on a closed test system or device, all without the use of alternating current (AC) power. Capabilities include the ability is to provide a modest vacuum (less than 10 Torr), perform a pressure rise leak test, measure the gas's absolute pressure, and perform volume measurements. All operations are performed through a simple rotary control valve which controls pneumatically-operated manifold valves.

  5. Detection of gas leakage

    DOEpatents

    Thornberg, Steven M; Brown, Jason

    2015-02-17

    A method of detecting leaks and measuring volumes as well as a device, the Power-free Pump Module (PPM), provides a self-contained leak test and volume measurement apparatus that requires no external sources of electrical power during leak testing or volume measurement. The PPM is a portable, pneumatically-controlled instrument capable of generating a vacuum, calibrating volumes, and performing quantitative leak tests on a closed test system or device, all without the use of alternating current (AC) power. Capabilities include the ability is to provide a modest vacuum (less than 10 Torr) using a venturi pump, perform a pressure rise leak test, measure the gas's absolute pressure, and perform volume measurements. All operations are performed through a simple rotary control valve which controls pneumatically-operated manifold valves.

  6. HEMP (high-altitude electromagnetic pulse) test and analysis of selected recloser-control units

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liu, T.K.; Sands, S.H.; Tesche, F.M.

    A simulated HEMP test was performed on power line recloser-control units in the ARES facility during the month of October 1988. Two types of recloser-control units were tested: an electronic control unit presently in wide use in electric power distribution systems and a new microprocessor based unit presently being introduced to electric utilities. It was found that the ARES fields did not cause reproducible disruptive failure of the equipment. Minor upsets, which were considered to be non-disruptive to the recloser operation, were observed. The test results were compared to the results of an analysis from a previous study and itmore » is concluded that the probability of disruptive failure of field operating recloser-control units subjected to a nominal unclassified HEMP environment is small. 3 refs., 30 figs., 1 tab.« less

  7. Low-Cost Control System Built Upon Consumer-Based Electronics For Supervisory Control Of A Gas-Operated Heat Pump

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wetherington Jr, G Randall; Vineyard, Edward Allan; Mahderekal, Isaac

    A preliminary evaluation of the performance of a consumer-based control system was conducted by the Oak Ridge National Laboratory (ORNL) and Southwest Gas as part of a cooperative research and development agreement (CRADA) authorized by the Department of Energy (DOE) (Mahderekal et al. (2013). The goal of the research was to evaluate the low-cost approach as a solution for implementing a supervisory control system for a residential gas-operated heat pump. The design incorporated two consumer-based micro-controllers; the Arduino Mega-2650 and the BeagleBone (white). Ten five-ton heat pump systems were designed, fabricated, and operationally tested in the Las Vega NV region.more » A robust data set was produced that allowed detailed assessment of the reliability and the operational perfromance of the newly developed control system. Experiences gained from the test provided important points of improvement for subsequent evolution of the heat pump technology.« less

  8. 16 CFR 1211.5 - General testing parameters.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... § 1211.4(c) for compliance with the Standard for Safety for Tests for Safety-Related Controls Employing... vibration level of 5g is to be used for the Vibration Test. (6) When a Computational Investigation is... tested. (8) The Endurance test is to be conducted concurrently with the Operational test. The control...

  9. 16 CFR § 1211.5 - General testing parameters.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... covered by § 1211.4(c) for compliance with the Standard for Safety for Tests for Safety-Related Controls... vibration level of 5g is to be used for the Vibration Test. (6) When a Computational Investigation is... tested. (8) The Endurance test is to be conducted concurrently with the Operational test. The control...

  10. 16 CFR 1211.5 - General testing parameters.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... § 1211.4(c) for compliance with the Standard for Safety for Tests for Safety-Related Controls Employing... vibration level of 5g is to be used for the Vibration Test. (6) When a Computational Investigation is... tested. (8) The Endurance test is to be conducted concurrently with the Operational test. The control...

  11. 16 CFR 1211.5 - General testing parameters.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... § 1211.4(c) for compliance with the Standard for Safety for Tests for Safety-Related Controls Employing... vibration level of 5g is to be used for the Vibration Test. (6) When a Computational Investigation is... tested. (8) The Endurance test is to be conducted concurrently with the Operational test. The control...

  12. Writing executable assertions to test flight software

    NASA Technical Reports Server (NTRS)

    Mahmood, A.; Andrews, D. M.; Mccluskey, E. J.

    1984-01-01

    An executable assertion is a logical statement about the variables or a block of code. If there is no error during execution, the assertion statement results in a true value. Executable assertions can be used for dynamic testing of software. They can be employed for validation during the design phase, and exception and error detection during the operation phase. The present investigation is concerned with the problem of writing executable assertions, taking into account the use of assertions for testing flight software. They can be employed for validation during the design phase, and for exception handling and error detection during the operation phase The digital flight control system and the flight control software are discussed. The considered system provides autopilot and flight director modes of operation for automatic and manual control of the aircraft during all phases of flight. Attention is given to techniques for writing and using assertions to test flight software, an experimental setup to test flight software, and language features to support efficient use of assertions.

  13. Comparative Evaluation of Immediate Post-Operative Sequelae after Surgical Removal of Impacted Mandibular Third Molar with or without Tube Drain - Split-Mouth Study.

    PubMed

    Kumar, Barun; Bhate, Kalyani; Dolas, R S; Kumar, Sn Santhosh; Waknis, Pushkar

    2016-12-01

    Third molar surgery is one of the most common surgical procedures performed in general dentistry. Post-operative variables such as pain, swelling and trismus are major concerns after impacted mandibular third molar surgery. Use of passive tube drain is supposed to help reduce these immediate post-operative sequelae. The current study was designed to compare the effect of tube drain on immediate post-operative sequelae following impacted mandibular third molar surgery. To compare the post-operative sequelae after surgical removal of impacted mandibular third molar surgery with or without tube drain. Thirty patients with bilateral impacted mandibular third molars were divided into two groups: Test (with tube drain) and control (without tube drain) group. In the test group, a tube drain was inserted through the releasing incision, and kept in place for three days. The control group was left without a tube drain. The post-operative variables like, pain, swelling, and trismus were calculated after 24 hours, 72 hours, 7 days, and 15 days in both the groups and analyzed statistically using chi-square and t-test analysis. The test group showed lesser swelling as compared to control group, with the swelling variable showing statistically significant difference at post-operative day 3 and 7 (p≤ 0.05) in both groups. There were no statistically significant differences in pain and trismus variables in both the groups. The use of tube drain helps to control swelling following impacted mandibular third molar surgery. However, it does not have much effect on pain or trismus.

  14. 42 CFR 493.1256 - Standard: Control procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Systems § 493.1256 Standard: Control procedures. (a) For each test system, the laboratory is responsible... test system failure, adverse environmental conditions, and operator performance. (2) Monitor over time the accuracy and precision of test performance that may be influenced by changes in test system...

  15. 42 CFR 493.1256 - Standard: Control procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Systems § 493.1256 Standard: Control procedures. (a) For each test system, the laboratory is responsible... test system failure, adverse environmental conditions, and operator performance. (2) Monitor over time the accuracy and precision of test performance that may be influenced by changes in test system...

  16. 42 CFR 493.1256 - Standard: Control procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Systems § 493.1256 Standard: Control procedures. (a) For each test system, the laboratory is responsible... test system failure, adverse environmental conditions, and operator performance. (2) Monitor over time the accuracy and precision of test performance that may be influenced by changes in test system...

  17. 42 CFR 493.1256 - Standard: Control procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Systems § 493.1256 Standard: Control procedures. (a) For each test system, the laboratory is responsible... test system failure, adverse environmental conditions, and operator performance. (2) Monitor over time the accuracy and precision of test performance that may be influenced by changes in test system...

  18. Spacesuit Portable Life Support System Breadboard (PLSS 1.0) Development and Test Results

    NASA Technical Reports Server (NTRS)

    Watts, Carly A.; Vogel, Matt

    2012-01-01

    A multi-year effort has been carried out at the Johnson Space Center to develop an advanced EVA PLSS design intended to further the current state of the art by increasing operational flexibility, reducing consumables, and increasing robustness. This multi-year effort has culminated in the construction and operation of PLSS 1.0, a test rig that simulates full functionality of the advanced PLSS design. PLSS 1.0 integrates commercial off-the-shelf hardware with prototype technology development components, including the primary and secondary oxygen regulators, ventilation loop fan, Rapid Cycle Amine (RCA) swingbed, and Spacesuit Water Membrane Evaporator (SWME). PLSS 1.0 was tested from June 17th through September 30th, 2011. Testing accumulated 233 hours over 45 days, while executing 119 test points. An additional 164 hours of operational time were accrued during the test series, bringing the total operational time for PLSS 1.0 testing to 397 hours. Specific PLSS 1.0 test objectives assessed during this testing include: (1) Confirming prototype components perform in a system level test as they have performed during component level testing, (2) Identifying unexpected system-level interactions (3) Operating PLSS 1.0 in nominal steady-state EVA modes to baseline subsystem performance with respect to metabolic rate, ventilation loop pressure and flow rate, and environmental conditions (4) Simulating nominal transient EVA operational scenarios (5) Simulating contingency EVA operational scenarios (6) Further evaluating prototype technology development components Successful testing of the PLSS 1.0 provided a large database of test results that characterize system level and component performance. With the exception of several minor anomalies, the PLSS 1.0 test rig performed as expected. Documented anomalies and observations include: (1) Ventilation loop fan controller issues at high fan speeds (near 70,000 rpm, whereas the fan speed during nominal operations would be closer to 35,000 rpm) (2) RCA performance at boundary conditions, including carbon dioxide and water vapor saturation events, as well as reduced vacuum quality (3) SWME valve anomalies (4 documented cases where the SWME failed to respond to a control signal or physically jammed, preventing SWME control) (4) Reduction of SWME hollow fiber hydrophobicity and significant reduction of the SWME degassing capability after significant accumulated test time.

  19. Electronically controlled mechanical seal for aerospace applications--Part 2: Transient tests

    NASA Technical Reports Server (NTRS)

    Wolff, Paul J.; Salant, Richard F.

    1995-01-01

    An electronically controlled mechanical seal for use as the purge gas seal in a liquid oxygen turbopump has been fabricated and tested under transient operating conditions. The thickness of the lubricating film is controlled by adjusting the coning of the carbon face. This is accomplished by applying a voltage to a piezoelectric actuator to which the carbon face is bonded. The seal has been operated with a closed-loop control system that utilizes either the leakage rate or seal face temperature as the feedback. Both speed and pressure transients have been imposed on the seal. The transient tests have demonstrated that the seal is capable of maintaing low leakage rates while limiting face temperatures.

  20. Control Room at the NACA’s Rocket Engine Test Facility

    NASA Image and Video Library

    1957-05-21

    Test engineers monitor an engine firing from the control room of the Rocket Engine Test Facility at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The Rocket Engine Test Facility, built in the early 1950s, had a rocket stand designed to evaluate high-energy propellants and rocket engine designs. The facility was used to study numerous different types of rocket engines including the Pratt and Whitney RL-10 engine for the Centaur rocket and Rocketdyne’s F-1 and J-2 engines for the Saturn rockets. The Rocket Engine Test Facility was built in a ravine at the far end of the laboratory because of its use of the dangerous propellants such as liquid hydrogen and liquid fluorine. The control room was located in a building 1,600 feet north of the test stand to protect the engineers running the tests. The main control and instrument consoles were centrally located in the control room and surrounded by boards controlling and monitoring the major valves, pumps, motors, and actuators. A camera system at the test stand allowed the operators to view the tests, but the researchers were reliant on data recording equipment, sensors, and other devices to provide test data. The facility’s control room was upgraded several times over the years. Programmable logic controllers replaced the electro-mechanical control devices. The new controllers were programed to operate the valves and actuators controlling the fuel, oxidant, and ignition sequence according to a predetermined time schedule.

  1. 40 CFR 63.4966 - How do I establish the emission capture system and add-on control device operating limits during...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... system and add-on control device operating limits during the performance test? 63.4966 Section 63.4966... outlet gas temperature is the maximum operating limit for your condenser. (e) Emission capture system... Emission Rate with Add-on Controls Option § 63.4966 How do I establish the emission capture system and add...

  2. NASA on a Strong Roll in Preparing Space Launch System Flight Engines

    NASA Image and Video Library

    2017-08-09

    NASA is on a roll when it comes to testing engines for its new Space Launch System (SLS) rocket that will send astronauts to deep-space destinations, including Mars. Just two weeks after the third test of a new RS-25 engine flight controller, the space agency recorded its fourth full-duration controller test Aug. 9 at Stennis Space Center near Bay St. Louis, Mississippi. Engineers conducted a 500-second test of the RS-25 engine controller on the A-1 Test Stand at Stennis. The test involved installing the controller on an RS-25 development engine and firing it in the same manner, and for the same length of time, as needed during an actual SLS launch. The test marked another milestone toward launch of the first integrated flight of the SLS rocket and Orion crew vehicle. Exploration Mission-1 will be an uncrewed mission into lunar orbit, designed to provide a final check-out test of rocket and Orion capabilities before astronauts are returned to deep space. The SLS rocket will be powered at launch by four RS-25 engines, providing a combined 2 million pounds of thrust, and with a pair of solid rocket boosters, providing more than 8 million pounds of total thrust. The RS-25 engines for the initial SLS flights are former space shuttle main engines that are now being used to launch the larger and heavier SLS rocket and with the new controller. The controller is a critical component that operates as the engine “brain” that communicates with SLS flight computers to receive operation performance commands and to provide diagnostic data on engine health and status. Engineers conducted early prototype tests at Stennis to collect data for development of the new controller by NASA, RS-25 prime contractor Aerojet Rocketdyne and subcontractor Honeywell. Testing of actual flight controllers began at Stennis in March. NASA is testing all controllers and engines designated for the EM-1 flight at Stennis. It also will test the SLS core stage for the flight at Stennis, which will involve installing the stage on the B-2 Test Stand and firing its four RS-25 engines simultaneously, as during an actual launch. RS-25 tests at Stennis are conducted by a team of NASA, Aerojet Rocketdyne and Syncom Space Services engineers and operators. Aerojet Rocketdyne is the RS-25 prime contractor. Syncom Space Services is the prime contractor for Stennis facilities and operations.

  3. Process test plan, phase II: waste retrieval sluicing system emissions collection

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    POWERS, R.L.

    1999-06-01

    This Process Test Plan is prepared to continue from HNF-3733 which was Phase I of the test. Supplemental operational controls and sampling requirements are defined to safely obtain gas samples from the 296-C-006 ventilation system stack during active operation of the sluicing equipment.

  4. 40 CFR 53.3 - General requirements for an equivalent method determination.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... temperature and pressure sensors, outdoor enclosure, electrical power supply, control devices and operator... rate cut-off; operation following power interruptions; effect of variations in power line voltage... other tests, full wind-tunnel tests similar to those described in § 53.62, or to special tests adapted...

  5. 75 FR 30105 - Petition for Waiver of Compliance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-28

    ... requirements for testing locomotive horns. LIRR operates 836 M-7 MU passenger cars of which 84 have had their horns tested; and 170 M-3 MU passenger cars of which 60 have had their horns tested. In addition, LIRR operates 80 diesel electric locomotives of which 7 horns have been tested; and 23 control car locomotives...

  6. 12. Historic view of Building 100 control room, showing television ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Historic view of Building 100 control room, showing television monitoring of tests and personnel operating rocket engine test controls. May 27, 1957. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. NASA photo number C-45021. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  7. Description and operational status of the National Transonic Facility computer complex

    NASA Technical Reports Server (NTRS)

    Boyles, G. B., Jr.

    1986-01-01

    This paper describes the National Transonic Facility (NTF) computer complex and its support of tunnel operations. The capabilities of the research data acquisition and reduction are discussed along with the types of data that can be acquired and presented. Pretest, test, and posttest capabilities are also outlined along with a discussion of the computer complex to monitor the tunnel control processes and provide the tunnel operators with information needed to control the tunnel. Planned enhancements to the computer complex for support of future testing are presented.

  8. 40 CFR 1037.550 - Special procedures for testing hybrid systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... simulating a chassis test with a pre-transmission or post-transmission hybrid system for A to B testing...) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM NEW HEAVY-DUTY MOTOR VEHICLES Test and Modeling...) Collect CO2 emissions while operating the system over the test cycles specified in § 1037.510. (c) Collect...

  9. Field testing of linear individual pitch control on the two-bladed controls advanced research turbine

    DOE PAGES

    van Solingen, Edwin; Fleming, Paul A.; Scholbrock, Andrew; ...

    2015-04-17

    This paper presents the results of field tests using linear individual pitch control (LIPC) on the two-bladed Controls Advanced Research Turbine 2 (CART2) at the National Renewable Energy Laboratory (NREL). LIPC has recently been introduced as an alternative to the conventional individual pitch control (IPC) strategy for two-bladed wind turbines. The main advantage of LIPC over conventional IPC is that it requires, at most, only two feedback loops to potentially reduce the periodic blade loads. In previous work, LIPC was designed to implement blade pitch angles at a fixed frequency (e.g., the once-per-revolution (1P) frequency), which made it only applicablemore » in above-rated wind turbine operating conditions. In this study, LIPC is extended to below-rated operating conditions by gain scheduling the controller on the rotor speed. With this extension, LIPC and conventional IPC are successfully applied to the NREL CART2 wind turbine. Lastly, the field-test results obtained during the measurement campaign indicate that LIPC significantly reduces the wind turbine loads for both below-rated and above-rated operation.« less

  10. A Simulation Based Investigation of High Latency Space Systems Operations

    NASA Technical Reports Server (NTRS)

    Li, Zu Qun; Moore, Michael; Bielski, Paul; Crues, Edwin Z.

    2017-01-01

    This study was the first in a series of planned tests to use physics-based subsystem simulations to investigate the interactions between a spacecraft's crew and a ground-based mission control center for vehicle subsystem operations across long communication delays. The simulation models the life support system of a deep space habitat. It contains models of an environmental control and life support system, an electrical power system, an active thermal control systems, and crew metabolic functions. The simulation has three interfaces: 1) a real-time crew interface that can be use to monitor and control the subsystems; 2) a mission control center interface with data transport delays up to 15 minute each way; and 3) a real-time simulation test conductor interface used to insert subsystem malfunctions and observe the interactions between the crew, ground, and simulated vehicle. The study was conducted at the 21st NASA Extreme Environment Mission Operations (NEEMO) mission. The NEEMO crew and ground support team performed a number of relevant deep space mission scenarios that included both nominal activities and activities with system malfunctions. While this initial test sequence was focused on test infrastructure and procedures development, the data collected in the study already indicate that long communication delays have notable impacts on the operation of deep space systems. For future human missions beyond cis-lunar, NASA will need to design systems and support tools to meet these challenges. These will be used to train the crew to handle critical malfunctions on their own, to predict malfunctions and assist with vehicle operations. Subsequent more detailed and involved studies will be conducted to continue advancing NASA's understanding of space systems operations across long communications delays.

  11. A Simulation Based Investigation of High Latency Space Systems Operations

    NASA Technical Reports Server (NTRS)

    Li, Zu Qun; Crues, Edwin Z.; Bielski, Paul; Moore, Michael

    2017-01-01

    This study was the first in a series of planned tests to use physics-based subsystem simulations to investigate the interactions between a spacecraft's crew and a ground-based mission control center for vehicle subsystem operations across long communication delays. The simulation models the life support system of a deep space habitat. It contains models of an environmental control and life support system, an electrical power system, an active thermal control system, and crew metabolic functions. The simulation has three interfaces: 1) a real-time crew interface that can be use to monitor and control the subsystems; 2) a mission control center interface with data transport delays up to 15 minute each way; and 3) a real-time simulation test conductor interface used to insert subsystem malfunctions and observe the interactions between the crew, ground, and simulated vehicle. The study was conducted at the 21st NASA Extreme Environment Mission Operations (NEEMO) mission. The NEEMO crew and ground support team performed a number of relevant deep space mission scenarios that included both nominal activities and activities with system malfunctions. While this initial test sequence was focused on test infrastructure and procedures development, the data collected in the study already indicate that long communication delays have notable impacts on the operation of deep space systems. For future human missions beyond cis-lunar, NASA will need to design systems and support tools to meet these challenges. These will be used to train the crew to handle critical malfunctions on their own, to predict malfunctions, and to assist with vehicle operations. Subsequent more detailed and involved studies will be conducted to continue advancing NASA's understanding of space systems operations across long communications delays.

  12. Is Teaching Simple Surgical Skills Using an Operant Learning Program More Effective Than Teaching by Demonstration?

    PubMed

    Levy, I Martin; Pryor, Karen W; McKeon, Theresa R

    2016-04-01

    A surgical procedure is a complex behavior that can be constructed from foundation or component behaviors. Both the component and the composite behaviors built from them are much more likely to recur if it they are reinforced (operant learning). Behaviors in humans have been successfully reinforced using the acoustic stimulus from a mechanical clicker, where the clicker serves as a conditioned reinforcer that communicates in a way that is language- and judgment-free; however, to our knowledge, the use of operant-learning principles has not been formally evaluated for acquisition of surgical skills. Two surgical tasks were taught and compared using two teaching strategies: (1) an operant learning methodology using a conditioned, acoustic reinforcer (a clicker) for positive reinforcement; and (2) a more classical approach using demonstration alone. Our goal was to determine whether a group that is taught a surgical skill using an operant learning procedure would more precisely perform that skill than a group that is taught by demonstration alone. Two specific behaviors, "tying the locking, sliding knot" and "making a low-angle drill hole," were taught to the 2014 Postgraduate Year (PGY)-1 class and first- and second-year medical students, using an operant learning procedure incorporating precise scripts along with acoustic feedback. The control groups, composed of PGY-1 and -2 nonorthopaedic surgical residents and first- and second-year medical students, were taught using demonstration alone. The precision and speed of each behavior was recorded for each individual by a single experienced surgeon, skilled in operant learning. The groups were then compared. The operant learning group achieved better precision tying the locking, sliding knot than did the control group. Twelve of the 12 test group learners tied the knot and precisely performed all six component steps, whereas only four of the 12 control group learners tied the knot and correctly performed all six component steps (the test group median was 10 [range, 10-10], the control group median was 0 [range, 0-10], p = 0.004). However, the median "time to tie the first knot" for the test group was longer than for the control group (test group median 271 seconds [range, 184-626 seconds], control group median 163 seconds [range 93-900 seconds], p = 0.017), whereas the "time to tie 10 of the locking, sliding knots" was the same for both groups (test group mean 95 seconds ± SD = 15 [range, 67-120 seconds], control group mean 95 seconds ± SD = 28 [range, 62-139 seconds], p = 0.996). For the low-angle drill hole test, the test group more consistently achieved the ideal six-step behavior for precisely drilling the low-angle hole compared with the control group (p = 0.006 for the median number of technique success comparison with an odds ratio [at the 95% confidence interval] of 82.3 [29.1-232.8]). The mean time to drill 10 low-angle holes was not different between the test group (mean 193 seconds ± SD = 26 [range, 153-222 seconds]) and the control group (mean 146 seconds ± SD = 63 [range, 114-294 seconds]) (p = 0.084). Operant learning occurs as the behavior is constructed and is highly reinforced with the result measured, not in the time saved, but in the ultimate outcome of an accurately built complex behavior. Level II, therapeutic study.

  13. IVHS Institutional and Legal Issues Program: Review of the FAST-TRAC Operational Test

    DOT National Transportation Integrated Search

    1994-06-01

    The FAST-TRAC (Faster and Safer Travel through Traffic Routing and Advanced Controls) operational test attempted to integrate advanced traveler information systems (ATIS) and advanced traffic management system (ATMS) technologies in Oakland County, M...

  14. Turbine gas temperature measurement and control system

    NASA Technical Reports Server (NTRS)

    Webb, W. L.

    1973-01-01

    A fluidic Turbine Inlet Gas Temperature (TIGIT) Measurement and Control System was developed for use on a Pratt and Whitney Aircraft J58 engine. Based on engine operating requirements, criteria for high temperature materials selection, system design, and system performance were established. To minimize development and operational risk, the TIGT control system was designed to interface with an existing Exhaust Gas Temperature (EGT) Trim System and thereby modulate steady-state fuel flow to maintain a desired TIGT level. Extensive component and system testing was conducted including heated (2300F) vibration tests for the fluidic sensor and gas sampling probe, temperature and vibration tests on the system electronics, burner rig testing of the TIGT measurement system, and in excess of 100 hours of system testing on a J58 engine. (Modified author abstract)

  15. Functional test generation for digital circuits described with a declarative language: LUSTRE

    NASA Astrophysics Data System (ADS)

    Almahrous, Mazen

    1990-08-01

    A functional approach to the test generation problem starting from a high level description is proposed. The circuit tested is modeled, using the LUSTRE high level data flow description language. The different LUSTRE primitives are translated to a SATAN format graph in order to evaluate the testability of the circuit and to generate test sequences. Another method of testing the complex circuits comprising an operative part and a control part is defined. It consists of checking experiments for the control part observed through the operative part. It was applied to the automata generated from a LUSTRE description of the circuit.

  16. WRAP low level waste restricted waste management (LLW RWM) glovebox acceptance test report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leist, K.J.

    1997-11-24

    On April 22, 1997, the Low Level Waste Restricted Waste Management (LLW RWM) glovebox was tested using acceptance test procedure 13027A-87. Mr. Robert L. Warmenhoven served as test director, Mr. Kendrick Leist acted as test operator and test witness, and Michael Lane provided miscellaneous software support. The primary focus of the glovebox acceptance test was to examine glovebox control system interlocks, operator Interface Unit (OIU) menus, alarms, and messages. Basic drum port and lift table control sequences were demonstrated. OIU menus, messages, and alarm sequences were examined, with few exceptions noted. Barcode testing was bypassed, due to the lack ofmore » installed equipment as well as the switch from basic reliance on fixed bar code readers to the enhanced use of portable bar code readers. Bar code testing was completed during performance of the LLW RWM OTP. Mechanical and control deficiencies were documented as Test Exceptions during performance of this Acceptance Test. These items are attached as Appendix A to this report.« less

  17. Step 1: Human System Integration Simulation and Flight Test Progress Report

    NASA Technical Reports Server (NTRS)

    2005-01-01

    The Access 5 Human Systems Integration Work Package produced simulation and flight demonstration planning products for use throughout the program. These included: Test Objectives for Command, Control, Communications; Pilot Questionnaire for Command, Control, Communications; Air Traffic Controller Questionnaire for Command, Control, Communications; Test Objectives for Collision Avoidance; Pilot Questionnaire for Collision Avoidance; Plans for Unmanned Aircraft Systems Control Station Simulations Flight Requirements for the Airspace Operations Demonstration

  18. A General Overview of the Data Acquisition and Controls Systems (DACS) of the E-Complex at NASA's Stennis Space Center

    NASA Technical Reports Server (NTRS)

    Hughes, Mark S.; Hebert, Phillip W.; Davis, Dawn M.; Jensen, Scott L.; Abell, Frederick K., Jr.

    2004-01-01

    The John C. Stennis Space Center (SSC) provides test operations services to a variety of customers, including NASA, DoD, and commercial enterprises for the development of current and next-generation rocket propulsion systems. Many of these testing services are provided in the E-Complex test facilities composed of three active test stands (E1, E2, & E3) and 7 total test positions. Each test position is outfitted with unique sets of data acquisition and controls hardware and software that record both facility and test article data and enable safe operation of the test facility. This paper addresses each system in more detail including efforts to upgrade hardware and software.

  19. Development of testing and training simulator for CEDMCS in KSNP

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nam, C. H.; Park, C. Y.; Nam, J. I.

    2006-07-01

    This paper presents a newly developed testing and training simulator (TTS) for automatically diagnosing and tuning the Control Element Drive Mechanism Control System (CEDMCS). TTS includes a new automatic, diagnostic, method for logic control cards and a new tuning method for phase synchronous pulse cards. In Korea Standard Nuclear Power Plants (KSNP). reactor trips occasionally occur due to a damaged logic control card in CEDMCS. However, there is no pre-diagnostic tester available to detect a damaged card in CEDMCS before it causes a reactor trip. Even after the reactor trip occurs, it is difficult to find the damaged card. Tomore » find the damaged card. ICT is usually used. ICT is an automated, computer-controlled testing system with measurement capabilities for testing active and passive components, or clusters of components, on printed circuit boards (PCB) and/or assemblies. However, ICT cannot detect a time dependent fault correctly and requires removal of the waterproof mating to perform the test. Therefore, the additional procedure of re-coating the PCB card is required after the test. TTS for CEDMCS is designed based on real plant conditions, both electrically and mechanically. Therefore, the operator can operate the Control Element Drive Mechanism (CEDM), which is mounted on the closure head of the reactor vessel (RV) using the soft control panel in ITS, which duplicates the Main Control Board (MCB) in the Main Control Room (MCR). However, during the generation of electric power in a nuclear power plant, it is difficult to operate the CEDM so a CEDM and Control Element Assembly (CEA) mock-up facility was developed to simulate a real plant CEDM. ITS was used for diagnosing and tuning control logic cards in CEDMCS in the Ulchin Nuclear Power Plant No. 4 during the plant overhaul period. It exhibited good performance in detecting the damaged cards and tuning the phase synchronous pulse cards. In addition, TTS was useful in training the CEDMCS operator by supplying detail signal information from the logic cards. (authors)« less

  20. SMES application for frequency control during islanded microgrid operation

    NASA Astrophysics Data System (ADS)

    Kim, A.-Rong; Kim, Gyeong-Hun; Heo, Serim; Park, Minwon; Yu, In-Keun; Kim, Hak-Man

    2013-01-01

    This paper analyzes the operating characteristics of a superconducting magnetic energy storage (SMES) for the frequency control of an islanded microgrid operation. In the grid-connected mode of a microgrid, an imbalance between power supply and demand is solved by a power trade with the upstream power grid. The difference in the islanded mode is a critical problem because the microgrid is isolated from any power grid. For this reason, the frequency control during islanded microgrid operation is a challenging issue. A test microgrid in this paper consisted of a wind power generator, a PV generation system, a diesel generator and a load to test the feasibility of the SMES for controlling frequency during islanded operation as well as the transient state varying from the grid-connected mode to the islanded mode. The results show that the SMES contributes well for frequency control in the islanded operation. In addition, a dual and a single magnet type of SMES have been compared to demonstrate the control performance. The dual magnet has the same energy capacity as the single magnet, but there are two superconducting coils and each coil has half inductance of the single magnet. The effectiveness of the SMES application with the simulation results is discussed in detail.

  1. Flight evaluation of a digital electronic engine control system in an F-15 airplane

    NASA Technical Reports Server (NTRS)

    Myers, L. P.; Mackall, K. G.; Burcham, F. W., Jr.; Walter, W. A.

    1982-01-01

    Benefits provided by a full-authority digital engine control are related to improvements in engine efficiency, performance, and operations. An additional benefit is the capability of detecting and accommodating failures in real time and providing engine-health diagnostics. The digital electronic engine control (DEEC), is a full-authority digital engine control developed for the F100-PW-100 turbofan engine. The DEEC has been flight tested on an F-15 aircraft. The flight tests had the objective to evaluate the DEEC hardware and software over the F-15 flight envelope. A description is presented of the results of the flight tests, which consisted of nonaugmented and augmented throttle transients, airstarts, and backup control operations. The aircraft, engine, DEEC system, and data acquisition and reduction system are discussed.

  2. The test of VLSI circuits

    NASA Astrophysics Data System (ADS)

    Baviere, Ph.

    Tests which have proven effective for evaluating VLSI circuits for space applications are described. It is recommended that circuits be examined after each manfacturing step to gain fast feedback on inadequacies in the production system. Data from failure modes which occur during operational lifetimes of circuits also permit redefinition of the manufacturing and quality control process to eliminate the defects identified. Other tests include determination of the operational envelope of the circuits, examination of the circuit response to controlled inputs, and the performance and functional speeds of ROM and RAM memories. Finally, it is desirable that all new circuits be designed with testing in mind.

  3. 14 CFR 29.307 - Proof of structure.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... system, including control surfaces; (3) Operation tests of the control system; (4) Flight stress... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... loading condition accounting for the environment to which the structure will be exposed in operation...

  4. 14 CFR 27.307 - Proof of structure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... system, including control surfaces; (3) Operation tests of the control system; (4) Flight stress... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... loading condition accounting for the environment to which the structure will be exposed in operation...

  5. 14 CFR 27.307 - Proof of structure.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... system, including control surfaces; (3) Operation tests of the control system; (4) Flight stress... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... loading condition accounting for the environment to which the structure will be exposed in operation...

  6. 14 CFR 29.307 - Proof of structure.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... system, including control surfaces; (3) Operation tests of the control system; (4) Flight stress... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... loading condition accounting for the environment to which the structure will be exposed in operation...

  7. 14 CFR 29.307 - Proof of structure.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... system, including control surfaces; (3) Operation tests of the control system; (4) Flight stress... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... loading condition accounting for the environment to which the structure will be exposed in operation...

  8. 14 CFR 27.307 - Proof of structure.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... system, including control surfaces; (3) Operation tests of the control system; (4) Flight stress... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... loading condition accounting for the environment to which the structure will be exposed in operation...

  9. 14 CFR 27.307 - Proof of structure.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... system, including control surfaces; (3) Operation tests of the control system; (4) Flight stress... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... loading condition accounting for the environment to which the structure will be exposed in operation...

  10. 14 CFR 29.307 - Proof of structure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... system, including control surfaces; (3) Operation tests of the control system; (4) Flight stress... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... loading condition accounting for the environment to which the structure will be exposed in operation...

  11. 40 CFR 60.53b - Standards for municipal waste combustor operating practices.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... for the purpose of evaluating system performance, testing new technology or control technologies... evaluating system performance, testing new technology or control technologies, diagnostic testing, or related... (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of...

  12. Wall adjustment strategy software for use with the NASA Langley 0.3-meter transonic cryogenic tunnel adaptive wall test section

    NASA Technical Reports Server (NTRS)

    Wolf, Stephen W. D.

    1988-01-01

    The Wall Adjustment Strategy (WAS) software provides successful on-line control of the 2-D flexible walled test section of the Langley 0.3-m Transonic Cryogenic Tunnel. This software package allows the level of operator intervention to be regulated as necessary for research and production type 2-D testing using and Adaptive Wall Test Section (AWTS). The software is designed to accept modification for future requirements, such as 3-D testing, with a minimum of complexity. The WAS software described is an attempt to provide a user friendly package which could be used to control any flexible walled AWTS. Control system constraints influence the details of data transfer, not the data type. Then this entire software package could be used in different control systems, if suitable interface software is available. A complete overview of the software highlights the data flow paths, the modular architecture of the software and the various operating and analysis modes available. A detailed description of the software modules includes listings of the code. A user's manual is provided to explain task generation, operating environment, user options and what to expect at execution.

  13. Effects of Selected Task Performance Criteria at Initiating Adaptive Task Real locations

    NASA Technical Reports Server (NTRS)

    Montgomery, Demaris A.

    2001-01-01

    In the current report various performance assessment methods used to initiate mode transfers between manual control and automation for adaptive task reallocation were tested. Participants monitored two secondary tasks for critical events while actively controlling a process in a fictional system. One of the secondary monitoring tasks could be automated whenever operators' performance was below acceptable levels. Automation of the secondary task and transfer of the secondary task back to manual control were either human- or machine-initiated. Human-initiated transfers were based on the operator's assessment of the current task demands while machine-initiated transfers were based on the operators' performance. Different performance assessment methods were tested in two separate experiments.

  14. Development of a Work Control System for Propulsion Testing at NASA Stennis

    NASA Technical Reports Server (NTRS)

    Messer, Elizabeth A.

    2005-01-01

    This paper will explain the requirements and steps taken to develop the current Propulsion Test Directorate electronic work control system for Test Operations. The PTD Work Control System includes work authorization and technical instruction documents, such as test preparation sheets, discrepancy reports, test requests, pre-test briefing reports, and other test operations supporting tools. The environment that existed in the E-Complex test areas in the late 1990's was one of enormous growth which brought people of diverse backgrounds together for the sole purpose of testing propulsion hardware. The problem that faced us was that these newly formed teams did not have a consistent and clearly understood method for writing, performing or verifying work. A paper system was developed that would allow the teams to use the same forms, but this still presented problems in the large amount of errors occurring, such as lost paperwork and inconsistent implementation. In a sampling of errors in August 1999, the paper work control system encountered 250 errors out of 230 documents released and completed, for an error rate of 111%.

  15. Pyrotechnically Operated Valves for Testing and Flight

    NASA Technical Reports Server (NTRS)

    Conley, Edgar G.; St.Cyr, William (Technical Monitor)

    2002-01-01

    Pyrovalves still warrant careful description of their operating characteristics, which is consistent with the NASA mission - to assure that both testing and flight hardware perform with the utmost reliability. So, until the development and qualification of the next generation of remotely controlled valves, in all likelihood based on shape memory alloy technology, pyrovalves will remain ubiquitous in controlling flow systems aloft and will possibly see growing use in ground-based testing facilities. In order to assist NASA in accomplishing this task, we propose a three-phase, three-year testing program. Phase I would set up an experimental facility, a 'test rig' in close cooperation with the staff located at the White Sands Test Facility in Southern New Mexico.

  16. The US National Transonic Facility, NTF

    NASA Technical Reports Server (NTRS)

    Bruce, Walter E., Jr.; Gloss, Blair B.

    1989-01-01

    The construction of the National Transonic Facility was completed in September 1982 and the start-up and checkout of tunnel systems were performed over the next two years. In August 1984, the Operational Readiness Review (ORR) was conducted and the facility was declared operational for final checkout of cryogenic instrumentation and control systems, and for the aerodynamic calibration and testing to commence. Also, the model access system for the cryogenic mode of operation would be placed into operation along with tunnel testing. Since the ORR, a host of operating problems resulting from the cryogenic environment were identified and solved. These range from making mechanical and electrical systems functional to eliminating temperature induced model vibration to coping with the outgassing of moisture from the thermal insulation. Additionally, a series of aerodynamic tests have demonstrated data quality and provided research data on several configurations. Some of the more significant efforts are reviewed since the ORR and the NTF status concerning hardware, instrumentation and process controls systems, operating constraints imposed by the cryogenic environment, and data quality are summarized.

  17. Project W-211, initial tank retrieval systems, description of operations for 241-AP-102 and 241-AP-104

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    RIECK, C.A.

    1999-02-25

    The primary purpose of the Initial Tank Retrieval Systems (ITRS) is to provide systems for retrieval of radioactive wastes stored in underground double-shell tanks (DSTS) for transfer to alternate storage, evaporation, pretreatment or treatment, while concurrently reducing risks associated with safety watch list and other DSTs. This Description of Operations (DOO) defines the control philosophy for the waste retrieval system for tanks 241-AP-102 (AP-102) and 241-AP-104 (AP-104). This DOO will provide a basis for the detailed design of the Retrieval Control System (RCS) for AP-102 and AP-104 and establishes test criteria for the RCS. The test criteria will be usedmore » during qualification testing and acceptance testing to verify operability.« less

  18. Acceptance test report (MI-74067-009-00). SVWS access arm (Serial number AA-09-03) (drawing 75M08129-13)

    NASA Technical Reports Server (NTRS)

    Hagood, J. T.

    1973-01-01

    Acceptance tests were conducted at Kennedy Space Center of the Saturn Vehicle Workshop Spacecraft Access Arm and related equipment. The tests were conducted to prove complete system capability to operate satisfactorily under conditions required to support spacecraft operations and activities. The SVWS Access Arm, serial number AA-09-03, is a Command Module Service Arm, S/A 9, which was removed from the mobile launcher and modified to support the SVWS operations. The C/M environmental chamber was removed and a completely new chamber was installed. The retract system was redesigned to remove the automatic/remote control capability and replaced with a local manual control. The SVWS Access Arm System was successfully tested and supported spacecraft processing without major problems.

  19. Comparative Evaluation of Immediate Post-Operative Sequelae after Surgical Removal of Impacted Mandibular Third Molar with or without Tube Drain - Split-Mouth Study

    PubMed Central

    Bhate, Kalyani; Dolas, RS; Kumar, SN Santhosh; Waknis, Pushkar

    2016-01-01

    Introduction Third molar surgery is one of the most common surgical procedures performed in general dentistry. Post-operative variables such as pain, swelling and trismus are major concerns after impacted mandibular third molar surgery. Use of passive tube drain is supposed to help reduce these immediate post-operative sequelae. The current study was designed to compare the effect of tube drain on immediate post-operative sequelae following impacted mandibular third molar surgery. Aim To compare the post-operative sequelae after surgical removal of impacted mandibular third molar surgery with or without tube drain. Materials and Methods Thirty patients with bilateral impacted mandibular third molars were divided into two groups: Test (with tube drain) and control (without tube drain) group. In the test group, a tube drain was inserted through the releasing incision, and kept in place for three days. The control group was left without a tube drain. The post-operative variables like, pain, swelling, and trismus were calculated after 24 hours, 72 hours, 7 days, and 15 days in both the groups and analyzed statistically using chi-square and t-test analysis. Results The test group showed lesser swelling as compared to control group, with the swelling variable showing statistically significant difference at post-operative day 3 and 7 (p≤ 0.05) in both groups. There were no statistically significant differences in pain and trismus variables in both the groups. Conclusion The use of tube drain helps to control swelling following impacted mandibular third molar surgery. However, it does not have much effect on pain or trismus. PMID:28209003

  20. Testing the equipment for the cryogenic optical test of the James Webb Space Telescope

    NASA Astrophysics Data System (ADS)

    Whitman, Tony L.; Dziak, K. J.; Huguet, Jesse; Knight, J. Scott; Reis, Carl; Wilson, Erin

    2014-08-01

    After integration of the Optical Telescope Element (OTE) to the Integrated Science Instrument Module (ISIM) to become the OTIS, the JWST optics are tested at NASA's Johnson Space Center (JSC) in the cryogenic vacuum Chamber A for alignment and optical performance. Tens of trucks full of custom test equipment are being delivered to the JSC, in addition to the large pieces built at the Center, and the renovation of the chamber itself. The facility is tested for the thermal stability control for optical measurements and contamination control during temperature transitions. The support for the OTIS is also tested for thermal stability control, load tested in the cryogenic environment, and tested for isolation of the background vibration for the optical measurements. The Center of Curvature Optical Assembly (COCOA) is tested for the phasing and wavefront error (WFE) measurement of an 18 segment mirror and for cryogenic operation. A photogrammetry system is tested for metrology performance and cryogenic operation. Test mirrors for auto-collimation measurements are tested for optical performance and cryogenic operation. An assembly of optical test sources are calibrated and tested in a cryogenic environment. A Pathfinder telescope is used as a surrogate telescope for cryogenic testing of the OTIS optical test configuration. A Beam Image Analyzer (BIA) is used as a surrogate ISIM with the Pathfinder in this test. After briefly describing the OTIS optical test configuration, the paper will overview the list and configuration of significant tests of the equipment leading up to the OTIS test.

  1. Developing Control System of Electrical Devices with Operational Expense Prediction

    NASA Astrophysics Data System (ADS)

    Sendari, Siti; Wahyu Herwanto, Heru; Rahmawati, Yuni; Mukti Putranto, Dendi; Fitri, Shofiana

    2017-04-01

    The purpose of this research is to develop a system that can monitor and record home electrical device’s electricity usage. This system has an ability to control electrical devices in distance and predict the operational expense. The system was developed using micro-controllers and WiFi modules connected to PC server. The communication between modules is arranged by server via WiFi. Beside of reading home electrical devices electricity usage, the unique point of the proposed-system is the ability of micro-controllers to send electricity data to server for recording the usage of electrical devices. The testing of this research was done by Black-box method to test the functionality of system. Testing system run well with 0% error.

  2. Manual control of unstable systems

    NASA Technical Reports Server (NTRS)

    Allen, R. W.; Hogue, J. R.; Parseghian, Z.

    1986-01-01

    Under certain operational regimes and failure modes, air and ground vehicles can present the human operator with a dynamically unstable or divergent control task. Research conducted over the last two decades has explored the ability of the human operator to control unstable systems under a variety of circumstances. Past research is reviewed and human operator control capabilities are summarized. A current example of automobile directional control under rear brake lockup conditions is also reviewed. A control system model analysis of the driver's steering control task is summarized, based on a generic driver/vehicle model presented at last year's Annual Manual. Results from closed course braking tests are presented that confirm the difficulty the average driver has in controlling the unstable directional dynamics arising from rear wheel lockup.

  3. 14 CFR 120.225 - How to implement an alcohol testing program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... principal place of business prior to starting operations, (ii) Implement an FAA alcohol testing program no... District Office nearest to your principal place of business. (3) An air traffic control facility not... Specification,(ii) Implement an FAA alcohol testing program no later than the date you start operations, and...

  4. Centrifuge. Operational Control Tests for Wastewater Treatment Facilities. Instructor's Manual [and] Student Workbook.

    ERIC Educational Resources Information Center

    Arasmith, E. E.

    Designed for individuals who have completed National Pollutant Discharge Elimination System (NPDES) level 1 laboratory training skills, this module provides waste water treatment plant operators with the basic information needed to: (1) successfully run a centrifuge test; (2) accurately read results obtained in test tubes; and (3) obtain…

  5. Practical Sequential Design Procedures for Submarine ASW Search Operational Testing: A Simulation Study

    DTIC Science & Technology

    1998-10-01

    The efficient design of a free play , 24 hour per day, operational test (OT) of an ASW search system remains a challenge to the OT community. It will...efficient, realistic, free play , 24 hour per day OT. The basic test control premise described here is to stop the test event if the time without a

  6. The Space Operations Simulation Center (SOSC) and Closed-loop Hardware Testing for Orion Rendezvous System Design

    NASA Technical Reports Server (NTRS)

    D'Souza, Christopher; Milenkovich, Zoran; Wilson, Zachary; Huich, David; Bendle, John; Kibler, Angela

    2011-01-01

    The Space Operations Simulation Center (SOSC) at the Lockheed Martin (LM) Waterton Campus in Littleton, Colorado is a dynamic test environment focused on Autonomous Rendezvous and Docking (AR&D) development testing and risk reduction activities. The SOSC supports multiple program pursuits and accommodates testing Guidance, Navigation, and Control (GN&C) algorithms for relative navigation, hardware testing and characterization, as well as software and test process development. The SOSC consists of a high bay (60 meters long by 15.2 meters wide by 15.2 meters tall) with dual six degree-of-freedom (6DOF) motion simulators and a single fixed base 6DOF robot. The large testing area (maximum sensor-to-target effective range of 60 meters) allows for large-scale, flight-like simulations of proximity maneuvers and docking events. The facility also has two apertures for access to external extended-range outdoor target test operations. In addition, the facility contains four Mission Operations Centers (MOCs) with connectivity to dual high bay control rooms and a data/video interface room. The high bay is rated at Class 300,000 (. 0.5 m maximum particles/m3) cleanliness and includes orbital lighting simulation capabilities.

  7. A Multiple Objective Test Assembly Approach for Exposure Control Problems in Computerized Adaptive Testing

    ERIC Educational Resources Information Center

    Veldkamp, Bernard P.; Verschoor, Angela J.; Eggen, Theo J. H. M.

    2010-01-01

    Overexposure and underexposure of items in the bank are serious problems in operational computerized adaptive testing (CAT) systems. These exposure problems might result in item compromise, or point at a waste of investments. The exposure control problem can be viewed as a test assembly problem with multiple objectives. Information in the test has…

  8. Calibration and Extension of a Discrete Event Operations Simulation Modeling Multiple Un-Manned Aerial Vehicles Controlled by a Single Operator

    DTIC Science & Technology

    2013-03-01

    within systems of UAVs and between UAVs and the operators that use them. The next step for small UAVs in this direction is for one operator to be able...Team’s testing efforts, both in the planning and execution stages. The flight tests would never have taken place without the tremendous assistance...1 1.2 Unmanned Aerial Systems

  9. Monitoring circuit accurately measures movement of solenoid valve

    NASA Technical Reports Server (NTRS)

    Gillett, J. D.

    1966-01-01

    Solenoid operated valve in a control system powered by direct current issued to accurately measure the valve travel. This system is currently in operation with a 28-vdc power system used for control of fluids in liquid rocket motor test facilities.

  10. Operational test results of the passive final approach spacing tool

    DOT National Transportation Integrated Search

    1997-06-01

    A prototype decision support tool for terminal area air traffic controllers, : referred to as the Final Approach Spacing Tool (FAST), was recently evaluated in : operation with live air traffic at the Dallas/Fort Worth, Texas Airport, : Controllers u...

  11. Depth of Blanket. Operational Control Tests for Wastewater Treatment Facilities. Instructor's Manual [and] Student Workbook.

    ERIC Educational Resources Information Center

    Arasmith, E. E.

    The determination of the thickness of a sludge blanket in primary and secondary clarifiers and in gravity thickness is important in making operational control decisions. Knowing the thickness and concentration will allow the operator to determine sludge volume and detention time. Designed for individuals who have completed National Pollutant…

  12. Test strategies for industrial testers for converter controls equipment

    NASA Astrophysics Data System (ADS)

    Oleniuk, P.; Di Cosmo, M.; Kasampalis, V.; Nisbet, D.; Todd, B.; Uznański, S.

    2017-04-01

    Power converters and their controls electronics are key elements for the operation of the CERN accelerator complex, having a direct impact on its availability. To prevent early-life failures and provide means to verify electronics, a set of industrial testers is used throughout the converters controls electronics' life cycle. The roles of the testers are to validate mass production during the manufacturing phase and to provide means to diagnose and repair failed modules that are brought back from operation. In the converter controls electronics section of the power converters group in the technology department of CERN (TE/EPC/CCE), two main test platforms have been adopted: a PXI platform for mixed analogue-digital functional tests and a JTAG Boundary-Scan platform for digital interconnection and functional tests. Depending on the functionality of the device under test, the appropriate test platforms are chosen. This paper is a follow-up to results presented at the TWEPP 2015 conference, adding the boundary scan test platform and the first results from exploitation of the test system. This paper reports on the test software, hardware design and test strategy applied for a number of devices that has resulted in maximizing test coverage and minimizing test design effort.

  13. Testing of a Liquid Oxygen/Liquid Methane Reaction Control Thruster in a New Altitude Rocket Engine Test Facility

    NASA Technical Reports Server (NTRS)

    Meyer, Michael L.; Arrington, Lynn A.; Kleinhenz, Julie E.; Marshall, William M.

    2012-01-01

    A relocated rocket engine test facility, the Altitude Combustion Stand (ACS), was activated in 2009 at the NASA Glenn Research Center. This facility has the capability to test with a variety of propellants and up to a thrust level of 2000 lbf (8.9 kN) with precise measurement of propellant conditions, propellant flow rates, thrust and altitude conditions. These measurements enable accurate determination of a thruster and/or nozzle s altitude performance for both technology development and flight qualification purposes. In addition the facility was designed to enable efficient test operations to control costs for technology and advanced development projects. A liquid oxygen-liquid methane technology development test program was conducted in the ACS from the fall of 2009 to the fall of 2010. Three test phases were conducted investigating different operational modes and in addition, the project required the complexity of controlling propellant inlet temperatures over an extremely wide range. Despite the challenges of a unique propellant (liquid methane) and wide operating conditions, the facility performed well and delivered up to 24 hot fire tests in a single test day. The resulting data validated the feasibility of utilizing this propellant combination for future deep space applications.

  14. Testing of an Amine-Based Pressure-Swing System for Carbon Dioxide and Humidity Control

    NASA Technical Reports Server (NTRS)

    Lin, Amy; Smith, Frederick; Sweterlitsch, Jeffrey; Graf, John; Nalette, Tim; Papale, William; Campbell, Melissa; Lu, Sao-Dung

    2007-01-01

    In a crewed spacecraft environment, atmospheric carbon dioxide (CO2) and moisture control is crucial. Hamilton Sundstrand has developed a stable and efficient amine-based CO2 and water vapor sorbent, SA9T, that is well-suited for use in a spacecraft environment. The sorbent is efficiently packaged in pressure-swing regenerable beds that are thermally linked to improve removal efficiency and minimize vehicle thermal loads. Flows are all controlled with a single spool valve. This technology has been baselined for the new Orion spacecraft. However, more data was needed on the operational characteristics of the package in a simulated spacecraft environment. A unit was therefore tested with simulated metabolic loads in a closed chamber at Johnson Space Center during the last third of 2006. Tests were run at a variety of cabin temperatures and with a range of operating conditions varying cycle time, vacuum pressure, air flow rate, and crew activity levels. Results of this testing are presented and potential flight operational strategies discussed.

  15. Flight-test experience in digital control of a remotely piloted vehicle.

    NASA Technical Reports Server (NTRS)

    Edwards, J. W.

    1972-01-01

    The development of a remotely piloted vehicle system consisting of a remote pilot cockpit and a ground-based digital computer coupled to the aircraft through telemetry data links is described. The feedback control laws are implemented in a FORTRAN program. Flight-test experience involving high feedback gain limits for attitude and attitude rate feedback variables, filtering of sampled data, and system operation during intermittent telemetry data link loss is discussed. Comparisons of closed-loop flight tests with analytical calculations, and pilot comments on system operation are included.

  16. Testing a Constrained MPC Controller in a Process Control Laboratory

    ERIC Educational Resources Information Center

    Ricardez-Sandoval, Luis A.; Blankespoor, Wesley; Budman, Hector M.

    2010-01-01

    This paper describes an experiment performed by the fourth year chemical engineering students in the process control laboratory at the University of Waterloo. The objective of this experiment is to test the capabilities of a constrained Model Predictive Controller (MPC) to control the operation of a Double Pipe Heat Exchanger (DPHE) in real time.…

  17. Operational summary of an electric propulsion long term test facility

    NASA Technical Reports Server (NTRS)

    Trump, G. E.; James, E. L.; Bechtel, R. T.

    1982-01-01

    An automated test facility capable of simultaneously operating three 2.5 kW, 30-cm mercury ion thrusters and their power processors is described, along with a test program conducted for the documentation of thruster characteristics as a function of time. Facility controls are analog, with full redundancy, so that in the event of malfunction the facility automaticcally activates a backup mode and notifies an operator. Test data are recorded by a central data collection system and processed as daily averages. The facility has operated continuously for a period of 37 months, over which nine mercury ion thrusters and four power processor units accumulated a total of over 14,500 hours of thruster operating time.

  18. MISSION CONTROL CENTER (MCC) - APOLLO-SOYUZ TEST PROJECT (ASTP) - JSC

    NASA Image and Video Library

    1975-07-17

    S75-28682 (17 July 1975) --- An overall view of the Mission Operations Control Room in the Mission Control Center during the joint U.S.-USSR Apollo-Soyuz Test Project docking mission in Earth orbit. The large television monitor shows a view of the Soyuz spacecraft as seen from the Apollo spacecraft during rendezvous and docking maneuvers. Eugene F. Kranz, JSC Deputy Director of Flight Operations, is standing in the foreground. M.P. Frank, the American senior ASTP flight director, is partially obscured on the right.

  19. 40 CFR 1051.505 - What special provisions apply for testing snowmobiles?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM RECREATIONAL ENGINES AND VEHICLES Test... for all testing you perform for that engine family. If we test your engines to confirm that they meet... cycle using the weighting factors specified for each mode. In each mode, operate the engine for at least...

  20. 40 CFR 1051.505 - What special provisions apply for testing snowmobiles?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM RECREATIONAL ENGINES AND VEHICLES Test... for all testing you perform for that engine family. If we test your engines to confirm that they meet... cycle using the weighting factors specified for each mode. In each mode, operate the engine for at least...

  1. 40 CFR 1051.505 - What special provisions apply for testing snowmobiles?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM RECREATIONAL ENGINES AND VEHICLES Test... for all testing you perform for that engine family. If we test your engines to confirm that they meet... cycle using the weighting factors specified for each mode. In each mode, operate the engine for at least...

  2. 40 CFR 1051.505 - What special provisions apply for testing snowmobiles?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM RECREATIONAL ENGINES AND VEHICLES Test... for all testing you perform for that engine family. If we test your engines to confirm that they meet... cycle using the weighting factors specified for each mode. In each mode, operate the engine for at least...

  3. Bypass control valve seal and bearing life cycle test report

    NASA Technical Reports Server (NTRS)

    Lundback, A. V.

    1972-01-01

    The operating characteristics of a bypass control valve seal and bearing life cycle tests are reported. Data from the initial assembly, leak, torque, and deflection tests are included along with the cycle life test results and conclusions. The equipment involved was to be used in the nuclear engine for the rocket vehicles program.

  4. Adaptive control schemes for improving dynamic performance of efficiency-optimized induction motor drives.

    PubMed

    Kumar, Navneet; Raj Chelliah, Thanga; Srivastava, S P

    2015-07-01

    Model Based Control (MBC) is one of the energy optimal controllers used in vector-controlled Induction Motor (IM) for controlling the excitation of motor in accordance with torque and speed. MBC offers energy conservation especially at part-load operation, but it creates ripples in torque and speed during load transition, leading to poor dynamic performance of the drive. This study investigates the opportunity for improving dynamic performance of a three-phase IM operating with MBC and proposes three control schemes: (i) MBC with a low pass filter (ii) torque producing current (iqs) injection in the output of speed controller (iii) Variable Structure Speed Controller (VSSC). The pre and post operation of MBC during load transition is also analyzed. The dynamic performance of a 1-hp, three-phase squirrel-cage IM with mine-hoist load diagram is tested. Test results are provided for the conventional field-oriented (constant flux) control and MBC (adjustable excitation) with proposed schemes. The effectiveness of proposed schemes is also illustrated for parametric variations. The test results and subsequent analysis confer that the motor dynamics improves significantly with all three proposed schemes in terms of overshoot/undershoot peak amplitude of torque and DC link power in addition to energy saving during load transitions. Copyright © 2015 ISA. Published by Elsevier Ltd. All rights reserved.

  5. Resonant Frequency Control For the PIP-II Injector Test RFQ: Control Framework and Initial Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Edelen, A. L.; Biedron, S. G.; Milton, S. V.

    For the PIP-II Injector Test (PI-Test) at Fermilab, a four-vane radio frequency quadrupole (RFQ) is designed to accelerate a 30-keV, 1-mA to 10-mA, H- beam to 2.1 MeV under both pulsed and continuous wave (CW) RF operation. The available headroom of the RF amplifiers limits the maximum allowable detuning to 3 kHz, and the detuning is controlled entirely via thermal regulation. Fine control over the detuning, minimal manual intervention, and fast trip recovery is desired. In addition, having active control over both the walls and vanes provides a wider tuning range. For this, we intend to use model predictive controlmore » (MPC). To facilitate these objectives, we developed a dedicated control framework that handles higher-level system decisions as well as executes control calculations. It is written in Python in a modular fashion for easy adjustments, readability, and portability. Here we describe the framework and present the first control results for the PI-Test RFQ under pulsed and CW operation.« less

  6. The WCSAR telerobotics test bed

    NASA Technical Reports Server (NTRS)

    Duffie, N.; Zik, J.; Teeter, R.; Crabb, T.

    1988-01-01

    Component technologies for use in telerobotic systems for space are being developed. As part of this effort, a test bed was established in which these technologies can be verified and integrated into telerobotic systems. The facility consists of two slave industrial robots, an articulated master arm controller, a cartesian coordinate master arm controller, and a variety of sensors, displays and stimulators for feedback to human operators. The controller of one of the slave robots remains in its commercial state, while the controller of the other robot has been replaced with a new controller that achieves high-performance in telerobotic operating modes. A dexterous slave hand which consists of two fingers and a thumb is being developed, along with a number of force-reflecting and non-force reflecting master hands, wrists and arms. A tactile sensing finger tip based on piezo-film technology has been developed, along with tactile stimulators and CAD-based displays for sensory feedback and sensory substitution. The telerobotics test bed and its component technologies are described, as well as the integration of these component technologies into telerobotic systems, and their performance in conjunction with human operators.

  7. A Strategy for Reforming Avionics Acquisition and Support

    DTIC Science & Technology

    1988-07-01

    are observable: " Some problems manifest symptoms in one operating mode but not in another. The pilot directly controls some radar operating modes by...for each flight. Their removals occurred in the flight controls , inertial navigation, head-up display, radar, and instru- ments. Although removals...accrue a comparable amount of service time. 6Automatic stations can test 50 LRU types although the Air Force has chosen to test only 37 of them at the

  8. 10 CFR Appendix A1 to Subpart B of... - Uniform Test Method for Measuring the Energy Consumption of Electric Refrigerators and Electric...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... freezer compartment volume as defined in HRF-1-1979, in cubic feet. 1.3“Anti-sweat heater” means a device... operating characteristics. 1.7“Standard cycle” means the cycle type in which the anti-sweat heater control... unit under test. Defrost controls are to be operative and the anti-sweat heater switch is to be “on...

  9. Peripheral Endothelial Function After Arterial Switch Operation for D-looped Transposition of the Great Arteries.

    PubMed

    Sun, Heather Y; Stauffer, Katie Jo; Nourse, Susan E; Vu, Chau; Selamet Tierney, Elif Seda

    2017-06-01

    Coronary artery re-implantation during arterial switch operation in patients with D-looped transposition of the great arteries (D-TGA) can alter coronary arterial flow and increase shear stress, leading to local endothelial dysfunction, although prior studies have conflicting results. Endothelial pulse amplitude testing can predict coronary endothelial dysfunction by peripheral arterial testing. This study tested if, compared to healthy controls, patients with D-TGA after arterial switch operation had peripheral endothelial dysfunction. Patient inclusion criteria were (1) D-TGA after neonatal arterial switch operation; (2) age 9-29 years; (3) absence of known cardiovascular risk factors such as hypertension, diabetes, hypercholesterolemia, vascular disease, recurrent vasovagal syncope, and coronary artery disease; and (4) ability to comply with overnight fasting. Exclusion criteria included (1) body mass index ≥85th percentile, (2) use of medications affecting vascular tone, or (3) acute illness. We assessed endothelial function by endothelial pulse amplitude testing and compared the results to our previously published data in healthy controls (n = 57). We tested 20 D-TGA patients (16.4 ± 4.8 years old) who have undergone arterial switch operation at a median age of 5 days (0-61 days). Endothelial pulse amplitude testing indices were similar between patients with D-TGA and controls (1.78 ± 0.61 vs. 1.73 ± 0.54, p = 0.73).In our study population of children and young adults, there was no evidence of peripheral endothelial dysfunction in patients with D-TGA who have undergone arterial switch operation. Our results support the theory that coronary arterial wall thickening and abnormal vasodilation reported in these patients is a localized phenomenon and not reflective of overall atherosclerotic burden.

  10. Architectures and Evaluation for Adjustable Control Autonomy for Space-Based Life Support Systems

    NASA Technical Reports Server (NTRS)

    Malin, Jane T.; Schreckenghost, Debra K.

    2001-01-01

    In the past five years, a number of automation applications for control of crew life support systems have been developed and evaluated in the Adjustable Autonomy Testbed at NASA's Johnson Space Center. This paper surveys progress on an adjustable autonomous control architecture for situations where software and human operators work together to manage anomalies and other system problems. When problems occur, the level of control autonomy can be adjusted, so that operators and software agents can work together on diagnosis and recovery. In 1997 adjustable autonomy software was developed to manage gas transfer and storage in a closed life support test. Four crewmembers lived and worked in a chamber for 91 days, with both air and water recycling. CO2 was converted to O2 by gas processing systems and wheat crops. With the automation software, significantly fewer hours were spent monitoring operations. System-level validation testing of the software by interactive hybrid simulation revealed problems both in software requirements and implementation. Since that time, we have been developing multi-agent approaches for automation software and human operators, to cooperatively control systems and manage problems. Each new capability has been tested and demonstrated in realistic dynamic anomaly scenarios, using the hybrid simulation tool.

  11. Controllable Grid Interface for Testing Ancillary Service Controls and Fault Performance of Utility-Scale Wind Power Generation: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gevorgian, Vahan; Koralewicz, Przemyslaw; Wallen, Robb

    The rapid expansion of wind power has led many transmission system operators to demand modern wind power plants to comply with strict interconnection requirements. Such requirements involve various aspects of wind power plant operation, including fault ride-through and power quality performance as well as the provision of ancillary services to enhance grid reliability. During recent years, the National Renewable Energy Laboratory (NREL) of the U.S. Department of Energy has developed a new, groundbreaking testing apparatus and methodology to test and demonstrate many existing and future advanced controls for wind generation (and other renewable generation technologies) on the multimegawatt scale andmore » medium-voltage levels. This paper describes the capabilities and control features of NREL's 7-MVA power electronic grid simulator (also called a controllable grid interface, or CGI) that enables testing many active and reactive power control features of modern wind turbine generators -- including inertial response, primary and secondary frequency responses, and voltage regulation -- under a controlled, medium-voltage grid environment. In particular, this paper focuses on the specifics of testing the balanced and unbalanced fault ride-through characteristics of wind turbine generators under simulated strong and weak medium-voltage grid conditions. In addition, this paper provides insights on the power hardware-in-the-loop feature implemented in the CGI to emulate (in real time) the conditions that might exist in various types of electric power systems under normal operations and/or contingency scenarios. Using actual test examples and simulation results, this paper describes the value of CGI as an ultimate modeling validation tool for all types of 'grid-friendly' controls by wind generation.« less

  12. Information management system breadboard data acquisition and control system.

    NASA Technical Reports Server (NTRS)

    Mallary, W. E.

    1972-01-01

    Description of a breadboard configuration of an advanced information management system based on requirements for high data rates and local and centralized computation for subsystems and experiments to be housed on a space station. The system is to contain a 10-megabit-per-second digital data bus, remote terminals with preprocessor capabilities, and a central multiprocessor. A concept definition is presented for the data acquisition and control system breadboard, and a detailed account is given of the operation of the bus control unit, the bus itself, and the remote acquisition and control unit. The data bus control unit is capable of operating under control of both its own test panel and the test processor. In either mode it is capable of both single- and multiple-message operation in that it can accept a block of data requests or update commands for transmission to the remote acquisition and control unit, which in turn is capable of three levels of data-handling complexity.

  13. Developments in Test Facility and Data Networking for the Altitude Test Stand at the John C. Stennis Space Center: A General Overview

    NASA Technical Reports Server (NTRS)

    Hebert, Phillip W.

    2008-01-01

    NASA/SSC's Mission in Rocket Propulsion Testing Is to Acquire Test Performance Data for Verification, Validation and Qualification of Propulsion Systems Hardware: Accurate, Reliable, Comprehensive, and Timely. Data Acquisition in a Rocket Propulsion Test Environment Is Challenging: a) Severe Temporal Transient Dynamic Environments; b) Large Thermal Gradients; c) Vacuum to high pressure regimes. A-3 Test Stand Development is equally challenging with respect to accommodating vacuum environment, operation of a CSG system, and a large quantity of data system and control channels to determine proper engine performance as well as Test Stand operation. SSC is currently in the process of providing modernized DAS, Control Systems, Video, and network systems for the A-3 Test Stand to overcome these challenges.

  14. 14 CFR 29.927 - Additional tests.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... controlled by the pilot under normal operating conditions (such as where the primary engine power control is accomplished through the flight control), the following test must be made: (1) Under conditions associated with... applicant for continued flight, for at least 30 minutes after perception by the flightcrew of the...

  15. A keyboard control method for loop measurement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gao, Z.W.

    1994-12-31

    This paper describes a keyboard control mode based on the DEC VAX computer. The VAX Keyboard code can be found under running of a program was developed. During the loop measurement or multitask operation, it ables to be distinguished from a keyboard code to stop current operation or transfer to another operation while previous information can be held. The combining of this mode, the author successfully used one key control loop measurement for test Dual Input Memory module which is used in a rearrange Energy Trigger system for LEP 8 Bunch operation.

  16. Water electrolysis system refurbishment and testing

    NASA Technical Reports Server (NTRS)

    Greenough, B. M.

    1972-01-01

    The electrolytic oxygen generator for the back-up water electrolysis system in a 90-day manned test was refurbished, improved and subjected to a 182-day bench test. The performance of the system during the test demonstrated the soundness of the basic electrolysis concept, the high development status of the automatic controls which allowed completely hands-off operation, and the capability for orbital operation. Some design improvements are indicated.

  17. Seminar on Understanding Digital Control and Analysis in Vibration Test Systems, part 2

    NASA Technical Reports Server (NTRS)

    1975-01-01

    A number of techniques for dealing with important technical aspects of the random vibration control problem are described. These include the generation of pseudo-random and true random noise, the control spectrum estimation problem, the accuracy/speed tradeoff, and control correction strategies. System hardware, the operator-system interface, safety features, and operational capabilities of sophisticated digital random vibration control systems are also discussed.

  18. Rise Time. Operational Control Tests for Wastewater Treatment Facilities. Instructor's Manual [and] Student Workbook.

    ERIC Educational Resources Information Center

    Carnegie, John W.

    The rise time test (along with the settleometer procedure) is used to monitor sludge behavior in the secondary clarifier of an activated sludge system. The test monitors the effect of the nitrification/denitrification process and aids the operator in determining optimum clarifier sludge detention time and, to some extent, optimum degree of…

  19. The Thirty Meter Telescope Site Testing Robotic Computer System

    NASA Astrophysics Data System (ADS)

    Riddle, Reed L.; Schöck, M.; Skidmore, W.; Els, S.; Travouillon, T.

    2008-03-01

    The Thirty Meter Telescope (TMT) project is currently testing five remote sites as candidates for the final location of the telescope. Each site has several instruments, including seeing monitors, weather stations, and turbulence profile measuring systems, each of which is computer controlled. As the sites are remote, they require a control system that can automatically manage the operations of all the varied subsystems, keep the systems safe from damage and recover from errors during operation. The robotic system must also be robust enough to operate without human intervention and when internet connections are lost. It is also critical that a data archiving system diligently records all data as gathered. This is a discussion of the TMT site testing robotic computer system as implemented.

  20. Development flight tests of JetStar LFC leading-edge flight test experiment

    NASA Technical Reports Server (NTRS)

    Fisher, David F.; Fischer, Michael C.

    1987-01-01

    The overall objective of the flight tests on the JetStar aircraft was to demonstrate the effectiveness and reliability of laminar flow control under representative flight conditions. One specific objective was to obtain laminar flow on the JetStar leading-edge test articles for the design and off-design conditions. Another specific objective was to obtain operational experience on a Laminar Flow Control (LFC) leading-edge system in a simulated airline service. This included operational experience with cleaning requirements, the effect of clogging, possible foreign object damage, erosion, and the effects of ice particle and cloud encounters. Results are summarized.

  1. Large-Scale Operations Management Test of Use of The White Amur for Control of Problem Aquatic Plants. Report 1. Baseline Studies. Volume V. The Herpetofauna of Lake Conway, Florida.

    DTIC Science & Technology

    1981-06-01

    V ADA02 7414 UNIVERSITY OF SOUTH FLORIDA TAMPA DEPT OF BIOLOGY F/6 6/6 LARGE-SCALE OPERATIONS MANAGEMENT TEST OF USE OF THE MHITE AMUM-ETC(U) JUN 81...Army Engineer Waterways Expiftaton P. 0. Box 631, Vicksburg, Miss. 391( 0 81 8 1102 LARGE-SCALE OPERATIONS MANAGEMENT TEST OF USE OF THE WHITE AMUR FOR...78-22// 4. TITLE (and Su~btitle) 5 TYPE OF REPORT & PERIOD COVERED LARGE-SCALE OPERATIONS MANAGEMENT TEST OF USE. or Report I of a series THE W4HITE

  2. ITC Guidelines on Quality Control in Scoring, Test Analysis, and Reporting of Test Scores

    ERIC Educational Resources Information Center

    Allalouf, Avi

    2014-01-01

    The Quality Control (QC) Guidelines are intended to increase the efficiency, precision, and accuracy of the scoring, analysis, and reporting process of testing. The QC Guidelines focus on large-scale testing operations where multiple forms of tests are created for use on set dates. However, they may also be used for a wide variety of other testing…

  3. Air cleaning performance of a new environmentally controlled primary crusher operator booth.

    PubMed

    Organiscak, J A; Cecala, A B; Zimmer, J A; Holen, B; Baregi, J R

    2016-02-01

    The National Institute for Occupational Safety and Health (NIOSH) cooperated with 3M Company in the design and testing of a new environmentally controlled primary crusher operator booth at the company's Wausau granite quarry near Wausau, WI. This quarry had an older crusher booth without a central heating, ventilation and air conditioning (HVAC) system, and without an air filtration and pressurization system. A new replacement operator booth was designed and installed by 3M based on design considerations from past NIOSH research on enclosed cab filtration systems. NIOSH conducted pre-testing of the old booth and post-testing of the new booth to assess the new filtration and pressurization system's effectiveness in controlling airborne dusts and particulates. The booth's dust and particulate control effectiveness is described by its protection factor, expressed as a ratio of the outside to inside concentrations measured during testing. Results indicate that the old booth provided negligible airborne respirable dust protection and low particulate protection from the outside environment. The newly installed booth provided average respirable dust protection factors from 2 to 25 over five shifts of dust sampling with occasional worker ingress and egress from the booth, allowing some unfiltered contaminants to enter the enclosure. Shorter-term particle count testing outside and inside the booth under near-steady-state conditions, with no workers entering or exiting the booth, resulted in protection factors from 35 to 127 on 0.3- to 1.0-μm respirable size particulates under various HVAC airflow operating conditions.

  4. Interface evaluation for soft robotic manipulators

    NASA Astrophysics Data System (ADS)

    Moore, Kristin S.; Rodes, William M.; Csencsits, Matthew A.; Kwoka, Martha J.; Gomer, Joshua A.; Pagano, Christopher C.

    2006-05-01

    The results of two usability experiments evaluating an interface for the operation of OctArm, a biologically inspired robotic arm modeled after an octopus tentacle, are reported. Due to the many degrees-of-freedom (DOF) for the operator to control, such 'continuum' robotic limbs provide unique challenges for human operators because they do not map intuitively. Two modes have been developed to control the arm and reduce the DOF under the explicit direction of the operator. In coupled velocity (CV) mode, a joystick controls changes in arm curvature. In end-effector (EE) mode, a joystick controls the arm by moving the position of an endpoint along a straight line. In Experiment 1, participants used the two modes to grasp objects placed at different locations in a virtual reality modeling language (VRML). Objective measures of performance and subjective preferences were recorded. Results revealed lower grasp times and a subjective preference for the CV mode. Recommendations for improving the interface included providing additional feedback and implementation of an error recovery function. In Experiment 2, only the CV mode was tested with improved training of participants and several changes to the interface. The error recovery function was implemented, allowing participants to reverse through previously attained positions. The mean time to complete the trials in the second usability test was reduced by more than 4 minutes compared with the first usability test, confirming the interface changes improved performance. The results of these tests will be incorporated into future versions of the arm and improve future usability tests.

  5. Development, Integration and Testing of Automated Triggering Circuit for Hybrid DC Circuit Breaker

    NASA Astrophysics Data System (ADS)

    Kanabar, Deven; Roy, Swati; Dodiya, Chiragkumar; Pradhan, Subrata

    2017-04-01

    A novel concept of Hybrid DC circuit breaker having combination of mechanical switch and static switch provides arc-less current commutation into the dump resistor during quench in superconducting magnet operation. The triggering of mechanical and static switches in Hybrid DC breaker can be automatized which can effectively reduce the overall current commutation time of hybrid DC circuit breaker and make the operation independent of opening time of mechanical switch. With this view, a dedicated control circuit (auto-triggering circuit) has been developed which can decide the timing and pulse duration for mechanical switch as well as static switch from the operating parameters. This circuit has been tested with dummy parameters and thereafter integrated with the actual test set up of hybrid DC circuit breaker. This paper deals with the conceptual design of the auto-triggering circuit, its control logic and operation. The test results of Hybrid DC circuit breaker using this circuit have also been discussed.

  6. Verification Test of Automated Robotic Assembly of Space Truss Structures

    NASA Technical Reports Server (NTRS)

    Rhodes, Marvin D.; Will, Ralph W.; Quach, Cuong C.

    1995-01-01

    A multidisciplinary program has been conducted at the Langley Research Center to develop operational procedures for supervised autonomous assembly of truss structures suitable for large-aperture antennas. The hardware and operations required to assemble a 102-member tetrahedral truss and attach 12 hexagonal panels were developed and evaluated. A brute-force automation approach was used to develop baseline assembly hardware and software techniques. However, as the system matured and operations were proven, upgrades were incorporated and assessed against the baseline test results. These upgrades included the use of distributed microprocessors to control dedicated end-effector operations, machine vision guidance for strut installation, and the use of an expert system-based executive-control program. This paper summarizes the developmental phases of the program, the results of several assembly tests, and a series of proposed enhancements. No problems that would preclude automated in-space assembly or truss structures have been encountered. The test system was developed at a breadboard level and continued development at an enhanced level is warranted.

  7. Managing computer-controlled operations

    NASA Technical Reports Server (NTRS)

    Plowden, J. B.

    1985-01-01

    A detailed discussion of Launch Processing System Ground Software Production is presented to establish the interrelationships of firing room resource utilization, configuration control, system build operations, and Shuttle data bank management. The production of a test configuration identifier is traced from requirement generation to program development. The challenge of the operational era is to implement fully automated utilities to interface with a resident system build requirements document to eliminate all manual intervention in the system build operations. Automatic update/processing of Shuttle data tapes will enhance operations during multi-flow processing.

  8. The determination of the operating range of a twin-grip control yoke through biomechanical means

    NASA Technical Reports Server (NTRS)

    Gaertner, K. P.

    1978-01-01

    A twin-grip control yoke was designed as an ergonomic case study that allows dual axis control inputs, both axes being rotational. Inputs are effected by rotating the grips. How the handles were designed with respect to their shape and size and how the angular range of the control yoke in both rotational axes was evaluated. The control yoke which requires two-hand operation was tested to determine its operating range. The intention of this investigation was to find out the optimal form of the control yoke and the maximum permissible range in both rotating axes. In these experiments controls had no spring resistance.

  9. Simulation-based Testing of Control Software

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ozmen, Ozgur; Nutaro, James J.; Sanyal, Jibonananda

    It is impossible to adequately test complex software by examining its operation in a physical prototype of the system monitored. Adequate test coverage can require millions of test cases, and the cost of equipment prototypes combined with the real-time constraints of testing with them makes it infeasible to sample more than a small number of these tests. Model based testing seeks to avoid this problem by allowing for large numbers of relatively inexpensive virtual prototypes that operate in simulation time at a speed limited only by the available computing resources. In this report, we describe how a computer system emulatormore » can be used as part of a model based testing environment; specifically, we show that a complete software stack including operating system and application software - can be deployed within a simulated environment, and that these simulations can proceed as fast as possible. To illustrate this approach to model based testing, we describe how it is being used to test several building control systems that act to coordinate air conditioning loads for the purpose of reducing peak demand. These tests involve the use of ADEVS (A Discrete Event System Simulator) and QEMU (Quick Emulator) to host the operational software within the simulation, and a building model developed with the MODELICA programming language using Buildings Library and packaged as an FMU (Functional Mock-up Unit) that serves as the virtual test environment.« less

  10. 40 CFR 63.3100 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... compliance with the operating limits for emission capture systems and add-on control devices required by § 63... maintain a log detailing the operation and maintenance of the emission capture systems, add-on control... add-on control device performance tests have been completed, as specified in § 63.3160. (f) If your...

  11. 40 CFR 63.3100 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... compliance with the operating limits for emission capture systems and add-on control devices required by § 63... maintain a log detailing the operation and maintenance of the emission capture systems, add-on control... add-on control device performance tests have been completed, as specified in § 63.3160. (f) If your...

  12. 46 CFR 61.35-3 - Required tests and checks.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... heaters without water level controls) must be tested by interrupting the feed water supply. Manual reset... alarm and visible indicator must be verified. The shutdown times must be verified. (3) Fuel supply... draft loss interlock switch must be tested to ensure proper operation. The draft limit control must...

  13. 14 CFR 61.45 - Practical tests: Required aircraft and equipment.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... test must have engine power controls and flight controls that are easily reached and operable in a... TRANSPORTATION (CONTINUED) AIRMEN CERTIFICATION: PILOTS, FLIGHT INSTRUCTORS, AND GROUND INSTRUCTORS General § 61...)(2) of this section or when permitted to accomplish the entire flight increment of the practical test...

  14. 14 CFR 61.45 - Practical tests: Required aircraft and equipment.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... test must have engine power controls and flight controls that are easily reached and operable in a... TRANSPORTATION (CONTINUED) AIRMEN CERTIFICATION: PILOTS, FLIGHT INSTRUCTORS, AND GROUND INSTRUCTORS General § 61...)(2) of this section or when permitted to accomplish the entire flight increment of the practical test...

  15. 14 CFR 61.45 - Practical tests: Required aircraft and equipment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... test must have engine power controls and flight controls that are easily reached and operable in a... TRANSPORTATION (CONTINUED) AIRMEN CERTIFICATION: PILOTS, FLIGHT INSTRUCTORS, AND GROUND INSTRUCTORS General § 61...)(2) of this section or when permitted to accomplish the entire flight increment of the practical test...

  16. 10 CFR 74.59 - Quality assurance and accounting requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... analyses and evaluations of the design, installation, preoperational tests, calibration, and operation of... performed at a pre-determined frequency, indicate a need for recalibration. Calibrations and tests must be... necessary for performance of the material control tests required by § 74.53(b). (e) Measurement control. The...

  17. 10 CFR 74.59 - Quality assurance and accounting requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... analyses and evaluations of the design, installation, preoperational tests, calibration, and operation of... performed at a pre-determined frequency, indicate a need for recalibration. Calibrations and tests must be... necessary for performance of the material control tests required by § 74.53(b). (e) Measurement control. The...

  18. Computerized Numerical Control Test Item Bank.

    ERIC Educational Resources Information Center

    Reneau, Fred; And Others

    This guide contains 285 test items for use in teaching a course in computerized numerical control. All test items were reviewed, revised, and validated by incumbent workers and subject matter instructors. Items are provided for assessing student achievement in such aspects of programming and planning, setting up, and operating machines with…

  19. 28,000 Hour Xenon Hollow Cathode LifeTest Results

    NASA Technical Reports Server (NTRS)

    Sarver-Verhey, Timothy R.

    1997-01-01

    The International Space Station Plasma Contactor System requires a hollow cathode assembly (HCA) with a lifetime of at least 18,000 hours. Critical components of the HCA include the hollow cathode and electron emitter. A series of hollow cathode wear tests was performed which included a life test operated at the maximum current of the HCA. This test sought to verify the hollow cathode design and contamination control protocols. The life test accumulated 27,800 hours of operation before failing to ignite. The hollow cathode exhibited relatively small changes in operating parameters over the course of the test. This life test is the longest duration test of a high current xenon hollow cathode reported to date.

  20. 49 CFR Appendix B to Part 385 - Explanation of Safety Rating Process

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-employment controlled substance test result (critical). § 382.303(a)Failing to conduct post accident testing... controls in place that function effectively to ensure acceptable compliance with the applicable safety... are those identified as such where noncompliance relates to management and/or operational controls...

  1. 49 CFR Appendix B to Part 385 - Explanation of Safety Rating Process

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-employment controlled substance test result (critical). § 382.303(a)Failing to conduct post accident testing... controls in place that function effectively to ensure acceptable compliance with the applicable safety... are those identified as such where noncompliance relates to management and/or operational controls...

  2. 76 FR 23801 - North American Electric Reliability Corporation; Order Approving Reliability Standard

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-28

    ... primary control functionality. Nonetheless, until data from drills, exercises and tests can support a... control center becomes inoperable and to conduct reviews and tests, at least annually, to ensure viability... Preparedness and Operations (EOP) Reliability Standard EOP- 008-1 (Loss of Control Center Functionality). The...

  3. 40 CFR 63.5716 - When must I conduct a performance test?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES... for Open Molding Operations Controlled by Add-on Control Devices § 63.5716 When must I conduct a performance test? (a) If your source is an existing source, you must complete the add-on control device...

  4. Reactor Simulator Testing

    NASA Technical Reports Server (NTRS)

    Schoenfeld, Michael P.; Webster, Kenny L.; Pearson, Boise J.

    2013-01-01

    As part of the Nuclear Systems Office Fission Surface Power Technology Demonstration Unit (TDU) project, a reactor simulator test loop (RxSim) was design & built to perform integrated testing of the TDU components. In particular, the objectives of RxSim testing was to verify the operation of the core simulator, the instrumentation and control system, and the ground support gas and vacuum test equipment. In addition, it was decided to include a thermal test of a cold trap purification design and a pump performance test at pump voltages up to 150 V since the targeted mass flow rate of 1.75 kg/s was not obtained in the RxSim at the originally constrained voltage of 120 V. This paper summarizes RxSim testing. The gas and vacuum ground support test equipment performed effectively in NaK fill, loop pressurization, and NaK drain operations. The instrumentation and control system effectively controlled loop temperature and flow rates or pump voltage to targeted settings. The cold trap design was able to obtain the targeted cold temperature of 480 K. An outlet temperature of 636 K was obtained which was lower than the predicted 750 K but 156 K higher than the cold temperature indicating the design provided some heat regeneration. The annular linear induction pump (ALIP) tested was able to produce a maximum flow rate of 1.53 kg/s at 800 K when operated at 150 V and 53 Hz.

  5. Reactor Simulator Integration and Testing

    NASA Technical Reports Server (NTRS)

    Schoenfield, M. P.; Webster, K. L.; Pearson, J. B.

    2013-01-01

    As part of the Nuclear Systems Office Fission Surface Power Technology Demonstration Unit (TDU) project, a reactor simulator (RxSim) test loop was designed and built to perform integrated testing of the TDU components. In particular, the objectives of RxSim testing were to verify the operation of the core simulator, the instrumentation and control system, and the ground support gas and vacuum test equipment. In addition, it was decided to include a thermal test of a cold trap purification design and a pump performance test at pump voltages up to 150 V because the targeted mass flow rate of 1.75 kg/s was not obtained in the RxSim at the originally constrained voltage of 120 V. This Technical Memorandum summarizes RxSim testing. The gas and vacuum ground support test equipment performed effectively in NaK fill, loop pressurization, and NaK drain operations. The instrumentation and control system effectively controlled loop temperature and flow rates or pump voltage to targeted settings. The cold trap design was able to obtain the targeted cold temperature of 480 K. An outlet temperature of 636 K was obtained, which was lower than the predicted 750 K but 156 K higher than the cold temperature, indicating the design provided some heat regeneration. The annular linear induction pump tested was able to produce a maximum flow rate of 1.53 kg/s at 800 K when operated at 150 V and 53 Hz.

  6. Automatic control of NASA Langley's 0.3-meter cryogenic test facility

    NASA Technical Reports Server (NTRS)

    Thibodeaux, J. J.; Balakrishna, S.

    1980-01-01

    Experience during the past 6 years of operation of the 0.3-meter transonic cryogenic tunnel at the NASA Langley Research Center has shown that there are problems associated with efficient operation and control of cryogenic tunnels using manual control schemes. This is due to the high degree of process crosscoupling between the independent control variables (temperature, pressure, and fan drive speed) and the desired test condition (Mach number and Reynolds number). One problem has been the inability to maintain long-term accurate control of the test parameters. Additionally, the time required to change from one test condition to another has proven to be excessively long and much less efficient than desirable in terms of liquid nitrogen and electrical power usage. For these reasons, studies have been undertaken to: (1) develop and validate a mathematical model of the 0.3-meter cryogenic tunnel process, (2) utilize this model in a hybrid computer simulation to design temperature and pressure feedback control laws, and (3) evaluate the adequacy of these control schemes by analysis of closed-loop experimental data. This paper will present the results of these studies.

  7. Design of a Facility to Test the Advanced Stirling Radioisotope Generator Engineering Unit

    NASA Technical Reports Server (NTRS)

    Lewandowski, Edward J.; Schreiber, Jeffrey G.; Oriti, Salvatore M.; Meer, David W.; Brace, Michael H.; Dugala, Gina

    2009-01-01

    The Advanced Stirling Radioisotope Generator (ASRG) is being considered to power deep space missions. An engineering unit, the ASRG-EU, was designed and fabricated by Lockheed Martin under contract to the Department of Energy. This unit is currently on an extended operation test at NASA Glenn Research Center to generate performance data and validate the life and reliability predictions for the generator and the Stirling convertors. A special test facility was designed and built for testing the ASRG-EU. Details of the test facility design are discussed. The facility can operate the convertors under AC bus control or with the ASRG-EU controller. It can regulate input thermal power in either a fixed temperature or fixed power mode. An enclosure circulates cooled air around the ASRG-EU to remove heat rejected from the ASRG-EU by convection. A custom monitoring and data acquisition system supports the test. Various safety features, which allow 2417 unattended operation, are discussed.

  8. Using CONFIG for Simulation of Operation of Water Recovery Subsystems for Advanced Control Software Evaluation

    NASA Technical Reports Server (NTRS)

    Malin, Jane T.; Flores, Luis; Fleming, Land; Throop, Daiv

    2002-01-01

    A hybrid discrete/continuous simulation tool, CONFIG, has been developed to support evaluation of the operability life support systems. CON FIG simulates operations scenarios in which flows and pressures change continuously while system reconfigurations occur as discrete events. In simulations, intelligent control software can interact dynamically with hardware system models. CONFIG simulations have been used to evaluate control software and intelligent agents for automating life support systems operations. A CON FIG model of an advanced biological water recovery system has been developed to interact with intelligent control software that is being used in a water system test at NASA Johnson Space Center

  9. Development and human factors analysis of an augmented reality interface for multi-robot tele-operation and control

    NASA Astrophysics Data System (ADS)

    Lee, Sam; Lucas, Nathan P.; Ellis, R. Darin; Pandya, Abhilash

    2012-06-01

    This paper presents a seamlessly controlled human multi-robot system comprised of ground and aerial robots of semiautonomous nature for source localization tasks. The system combines augmented reality interfaces capabilities with human supervisor's ability to control multiple robots. The role of this human multi-robot interface is to allow an operator to control groups of heterogeneous robots in real time in a collaborative manner. It used advanced path planning algorithms to ensure obstacles are avoided and that the operators are free for higher-level tasks. Each robot knows the environment and obstacles and can automatically generate a collision-free path to any user-selected target. It displayed sensor information from each individual robot directly on the robot in the video view. In addition, a sensor data fused AR view is displayed which helped the users pin point source information or help the operator with the goals of the mission. The paper studies a preliminary Human Factors evaluation of this system in which several interface conditions are tested for source detection tasks. Results show that the novel Augmented Reality multi-robot control (Point-and-Go and Path Planning) reduced mission completion times compared to the traditional joystick control for target detection missions. Usability tests and operator workload analysis are also investigated.

  10. Flight test of a full authority Digital Electronic Engine Control system in an F-15 aircraft

    NASA Technical Reports Server (NTRS)

    Barrett, W. J.; Rembold, J. P.; Burcham, F. W.; Myers, L.

    1981-01-01

    The Digital Electronic Engine Control (DEEC) system considered is a relatively low cost digital full authority control system containing selectively redundant components and fault detection logic with capability for accommodating faults to various levels of operational capability. The DEEC digital control system is built around a 16-bit, 1.2 microsecond cycle time, CMOS microprocessor, microcomputer system with approximately 14 K of available memory. Attention is given to the control mode, component bench testing, closed loop bench testing, a failure mode and effects analysis, sea-level engine testing, simulated altitude engine testing, flight testing, the data system, cockpit, and real time display.

  11. Use of the Charge/Discharge (C/D) ratio to augment voltage limit (V sub T) charge control in the ERBS spacecraft

    NASA Astrophysics Data System (ADS)

    Halpert, G.

    1982-07-01

    A 50-ampere hour nickel cadmium cell test pack was operated in a power profile simulating the orbit of the Earth Radiation Budget Satellite (ERBS). The objective was to determine the ability of the temperature compensated voltage limit (V sub T) charge control system to maintain energy balance in the half sine wave-type current profile expected of this mission. The four-cell pack (50 E) was tested at the Naval Weapons Support Center (NWSC) at Crane, Indiana. The ERBS evaluation test consisted of two distinct operating sequences, each having a specific purpose. The first phase was a parametric test involving the effect of V sub T level, temperature, and Beta angle on the charge/discharge (C/D) ratio, an indicator of the amount of overcharge. The second phase of testing made use of the C/D ratio limit to augment the V sub T charge limit control. When the C/D limit was reached, the current was switched from the taper mode to a C/67 (0.75 A) trickle charge. The use of an ampere hour integrator limiting the overcharge to a C/67 rate provided a fine tuning of the charge control technique which eliminated the sensitivity problems noted in the initial operating sequence.

  12. Use of the Charge/Discharge (C/D) ratio to aument voltage limit (V sub T) charge control in the ERBS spacecraft

    NASA Technical Reports Server (NTRS)

    Halpert, G.

    1982-01-01

    A 50-ampere hour nickel cadmium cell test pack was operated in a power profile simulating the orbit of the Earth Radiation Budget Satellite (ERBS). The objective was to determine the ability of the temperature compensated voltage limit (V sub T) charge control system to maintain energy balance in the half sine wave-type current profile expected of this mission. The four-cell pack (50 E) was tested at the Naval Weapons Support Center (NWSC) at Crane, Indiana. The ERBS evaluation test consisted of two distinct operating sequences, each having a specific purpose. The first phase was a parametric test involving the effect of V sub T level, temperature, and Beta angle on the charge/discharge (C/D) ratio, an indicator of the amount of overcharge. The second phase of testing made use of the C/D ratio limit to augment the V sub T charge limit control. When the C/D limit was reached, the current was switched from the taper mode to a C/67 (0.75 A) trickle charge. The use of an ampere hour integrator limiting the overcharge to a C/67 rate provided a fine tuning of the charge control technique which eliminated the sensitivity problems noted in the initial operating sequence.

  13. Efficiency in pathology laboratories: a survey of operations management in NHS bacteriology.

    PubMed

    Szczepura, A K

    1991-01-01

    In recent years pathology laboratory services in the U.K. have experienced large increases in demand. But the extent to which U.K. laboratories have introduced controls to limit unnecessary procedures within the laboratory was previously unclear. This paper presents the results of a survey of all 343 NHS bacteriology laboratories which records the extent to which such operations management controls are now in place. The survey shows large differences between laboratories. Quality controls over inputs, the use of screening tests as a culture substitute, the use of direct susceptibility testing, controls over routine antibiotic susceptibility testing, and controls over reporting of results all vary widely. The survey also records the prevalence of hospital antibiotic policies, the extent to which laboratories produce antibiograms for user clinicians, the degree of computerisation in data handling, and the degree of automation in processing specimens. Finally, the survey uncovers a large variation between NHS labs in the percentage of bacteriology samples which prove positive and lead to antibiotic susceptibility tests being carried out.

  14. Environmental Systems Test Stand

    NASA Astrophysics Data System (ADS)

    Barta, D.; Young, J.; Ewert, M.; Lee, S.; Wells, P.; Fortson, R.; Castillo, J.

    A test stand has been developed for the evaluation of prototype lighting, environmental control and crop cultivation technologies for plant production within an advanced life support system. Design of the test stand was based on preliminary designs of the center growth bay of the Biomass Production Chamber, one of several modules of the Bioregenerative Planetary Life Support Systems Test Complex (BIO- Plex). It consists of two controlled-environment shelves, each with 4.7 m2 of area for crop growth (150 cm width, 315 cm length). There are two chilled water loops, one for operation at conventional temperatures (5-10C) for air temperature and humidity control and one for operation at higher temperatures (15-50C) for waste heat acquisition and heating. Modular light boxes, utilizing either air-cooled or water- jacketed HPS lamps, have been developed. This modular design will allow for easy replacement of new lighting technologies within the light banks. An advanced data acquisition and control system has been developed utilizing localized, networked- based data acquisition modules and programmed with object-based control software.

  15. Developments to Increase the Performance, Operational Versatility and Automation of a Lunar Surface Manipulation System

    NASA Technical Reports Server (NTRS)

    Dorsey, John T.; Jones, Thomas C.; Doggett, William R.; Roithmayr, Carlos M.; King, Bruce D.; Mikulas, Marting M.

    2009-01-01

    The objective of this paper is to describe and summarize the results of the development efforts for the Lunar Surface Manipulation System (LSMS) with respect to increasing the performance, operational versatility, and automation. Three primary areas of development are covered, including; the expansion of the operational envelope and versatility of the current LSMS test-bed, the design of a second generation LSMS, and the development of automation and remote control capability. The first generation LSMS, which has been designed, built, and tested both in lab and field settings, is shown to have increased range of motion and operational versatility. Features such as fork lift mode, side grappling of payloads, digging and positioning of lunar regolith, and a variety of special end effectors are described. LSMS operational viability depends on bei nagble to reposition its base from an initial position on the lander to a mobility chassis or fixed locations around the lunar outpost. Preliminary concepts are presented for the second generation LSMS design, which will perform this self-offload capability. Incorporating design improvements, the second generation will have longer reach and three times the payload capability, yet it will have approximately equivalent mass to the first generation. Lastly, this paper covers improvements being made to the control system of the LSMS test-bed, which is currently operated using joint velocity control with visual cues. These improvements include joint angle sensors, inverse kinematics, and automated controls.

  16. NASA Conducts First RS-25 Rocket Engine Test of 2018

    NASA Image and Video Library

    2018-01-16

    A main objective for today’s test will be testing a new flight controller or “brain” of the engine. The controller, which is currently installed on a developmental engine, has the electronics that operate the engine and communicate with the SLS vehicle. Once test data is certified, the engine controller will be removed and installed on a flight engine in preparation for flight of SLS and the Orion spacecraft.

  17. Development and testing of a computer assisted remote-control system for the compact loader-trammer. Report of Investigations/1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ruff, T.M.

    1992-01-01

    A prototype mucking machine designed to operate in narrow vein stopes was developed by Foster-Miller, Inc., Waltham, MA, under contract with the U.S. Bureau of Mines. The machine, called a compact loader/trammer, or minimucker, was designed to replace slusher muckers in narrow-vein underground mines. The minimucker is a six-wheel-drive, skid-steered, load-haul-dump machine that loads muck at the front with a novel slide-bucket system and ejects it out the rear so that the machine does not have to be turned around. To correct deficiencies of the tether remote control system, a computer-based, radio remote control was retrofitted to the minimucker. Initialmore » tests indicated a need to assist the operator in guiding the machine in narrow stopes and an automatic guidance system that used ultrasonic ranging sensors and a wall-following algorithm was installed. Additional tests in a simulated test stope showed that these changes improved the operation of the minimucker. The design and functions of the minimucker and its computer-based, remote control system are reviewed, and an ultrasonic, sensor-based guidance system is described.« less

  18. Hypermedia and intelligent tutoring applications in a mission operations environment

    NASA Technical Reports Server (NTRS)

    Ames, Troy; Baker, Clifford

    1990-01-01

    Hypermedia, hypertext and Intelligent Tutoring System (ITS) applications to support all phases of mission operations are investigated. The application of hypermedia and ITS technology to improve system performance and safety in supervisory control is described - with an emphasis on modeling operator's intentions in the form of goals, plans, tasks, and actions. Review of hypermedia and ITS technology is presented as may be applied to the tutoring of command and control languages. Hypertext based ITS is developed to train flight operation teams and System Test and Operation Language (STOL). Specific hypermedia and ITS application areas are highlighted, including: computer aided instruction of flight operation teams (STOL ITS) and control center software development tools (CHIMES and STOL Certification Tool).

  19. Design and evaluation of a sensor fail-operational control system for a digitally controlled turbofan engine

    NASA Technical Reports Server (NTRS)

    Hrach, F. J.; Arpasi, D. J.; Bruton, W. M.

    1975-01-01

    A self-learning, sensor fail-operational, control system for the TF30-P-3 afterburning turbofan engine was designed and evaluated. The sensor fail-operational control system includes a digital computer program designed to operate in conjunction with the standard TF30-P-3 bill-of-materials control. Four engine measurements and two compressor face measurements are tested. If any engine measurements are found to have failed, they are replaced by values synthesized from computer-stored information. The control system was evaluated by using a realtime, nonlinear, hybrid computer engine simulation at sea level static condition, at a typical cruise condition, and at several extreme flight conditions. Results indicate that the addition of such a system can improve the reliability of an engine digital control system.

  20. Testing the Effects of Helium Pressurant on Thermodynamic Vent System Performance with Liquid Hydrogen

    NASA Technical Reports Server (NTRS)

    Flachbart, R. H.; Hastings, L. J.; Hedayat, A.; Nelson, S.; Tucker, S.

    2006-01-01

    In support of the development of a zero gravity pressure control capability for liquid hydrogen, testing was conducted at the Marshall Space Flight Center using the Multipurpose Hydrogen Test Bed (MHTB) to evaluate the effects of helium pressurant on the performance of a spray bar thermodynamic vent system (TVS). Fourteen days of testing was performed in August - September 2005, with an ambient heat leak of about 70-80 watts and tank fill levels of 90%, 50%, and 25%. The TVS successfully controlled the tank pressure within a +/- 3.45 kPa (+/- 0.5 psi) band with various helium concentration levels in the ullage. Relative to pressure control with an "all hydrogen" ullage, the helium presence resulted in 10 to 30 per cent longer pressure reduction durations, depending on the fill level, during the mixing/venting phase of the control cycle. Additionally, the automated control cycle was based on mixing alone for pressure reduction until the pressure versus time slope became positive, at which time the Joule-Thomson vent was opened. Testing was also conducted to evaluate thermodynamic venting without the mixer operating, first with liquid then with vapor at the recirculation line inlet. Although ullage stratification was present, the ullage pressure was successfully controlled without the mixer operating. Thus, if vapor surrounded the pump inlet in a reduced gravity situation, the ullage pressure can still be controlled by venting through the TVS Joule Thomson valve and heat exchanger. It was evident that the spray bar configuration, which extends almost the entire length of the tank, enabled significant thermal energy removal from the ullage even without the mixer operating. Details regarding the test setup and procedures are presented in the paper. 1

  1. DSN system performance test software

    NASA Technical Reports Server (NTRS)

    Martin, M.

    1978-01-01

    The system performance test software is currently being modified to include additional capabilities and enhancements. Additional software programs are currently being developed for the Command Store and Forward System and the Automatic Total Recall System. The test executive is the main program. It controls the input and output of the individual test programs by routing data blocks and operator directives to those programs. It also processes data block dump requests from the operator.

  2. Surface Telerobotics: Development and Testing of a Crew Controlled Planetary Rover System

    NASA Technical Reports Server (NTRS)

    Fong, Terry; Bualat, Maria; Allan, Mark B; Bouyssounouse, Xavier; Cohen, Tamar

    2013-01-01

    During Summer 2013, we conducted a series of tests to examine how astronauts in the In- ternational Space Station (ISS) can remotely operate a planetary rover. The tests simulated portions of a proposed mission, in which an astronaut in lunar orbit remotely operates a planetary rover to deploy a radio telescope on the lunar farside. In this paper, we present the design, implementation, and preliminary test results.

  3. ERDA/NASA 100 kilowatt mod-o wind turbine operations and performance. [at the NASA Plum Brook Station, Ohio

    NASA Technical Reports Server (NTRS)

    Thomas, R. L.; Richards, T. R.

    1977-01-01

    The ERDA/NASA 100 kW Mod-0 wind turbine is operating at the NASA Plum Brook Station near Sandusky, Ohio. The operation of the wind turbine has been fully demonstrated and includes start-up, synchronization to the utility network, blade pitch control for control of power and speed, and shut-down. Also, fully automatic operation has been demonstrated by use of a remote control panel, 50 miles from the site, similar to what a utility dispatcher might use. The operation systems and experience with the wind turbine loads, electrical power and aerodynamic performance obtained from testing are described.

  4. Turbine Powered Simulator Calibration and Testing for Hybrid Wing Body Powered Airframe Integration

    NASA Technical Reports Server (NTRS)

    Shea, Patrick R.; Flamm, Jeffrey D.; Long, Kurtis R.; James, Kevin D.; Tompkins, Daniel M.; Beyar, Michael D.

    2016-01-01

    Propulsion airframe integration testing on a 5.75% scale hybrid wing body model us- ing turbine powered simulators was completed at the National Full-Scale Aerodynamics Complex 40- by 80-foot test section. Four rear control surface con gurations including a no control surface de ection con guration were tested with the turbine powered simulator units to investigate how the jet exhaust in uenced the control surface performance as re- lated to the resultant forces and moments on the model. Compared to ow-through nacelle testing on the same hybrid wing body model, the control surface e ectiveness was found to increase with the turbine powered simulator units operating. This was true for pitching moment, lift, and drag although pitching moment was the parameter of greatest interest for this project. With the turbine powered simulator units operating, the model pitching moment was seen to increase when compared to the ow-through nacelle con guration indicating that the center elevon and vertical tail control authority increased with the jet exhaust from the turbine powered simulator units.

  5. Advanced Stirling Convertor Control Unit Testing at NASA Glenn Research Center in the Radioisotope Power Systems System Integration Laboratory

    NASA Technical Reports Server (NTRS)

    Dugala, Gina M.; Taylor, Linda M.; Kussmaul, Michael; Casciani, Michael; Brown, Gregory; Wiser, Joel

    2017-01-01

    Future NASA missions could include establishing Lunar or Martian base camps, exploring Jupiters moons and travelling beyond where generating power from sunlight may be limited. Radioisotope Power Systems (RPS) provide a dependable power source for missions where inadequate sunlight or operational requirements make other power systems impractical. Over the past decade, NASA Glenn Research Center (GRC) has been supporting the development of RPSs. The Advanced Stirling Radioisotope Generator (ASRG) utilized a pair of Advanced Stirling Convertors (ASC). While flight development of the ASRG has been cancelled, much of the technology and hardware continued development and testing to guide future activities. Specifically, a controller for the convertor(s) is an integral part of a Stirling-based RPS. For the ASRG design, the controller maintains stable operation of the convertors, regulates the alternating current produced by the linear alternator of the convertor, provides a specified direct current output voltage for the spacecraft, synchronizes the piston motion of the two convertors in order to minimize vibration as well as manage and maintain operation with a stable piston amplitude and hot end temperature. It not only provides power to the spacecraft but also must regulate convertor operation to avoid damage to internal components and maintain safe thermal conditions after fueling. Lockheed Martin Coherent Technologies has designed, developed and tested an Engineering Development Unit (EDU) Advanced Stirling Convertor Control Unit (ACU) to support this effort. GRC used the ACU EDU as part of its non-nuclear representation of a RPS which also consists of a pair of Dual Advanced Stirling Convertor Simulator (DASCS), and associated support equipment to perform a test in the Radioisotope Power Systems System Integration Laboratory (RSIL). The RSIL was designed and built to evaluate hardware utilizing RPS technology. The RSIL provides insight into the electrical interactions between as many as 3 radioisotope power generators, associated control strategies, and typical electric system loads. The first phase of testing included a DASCS which was developed by Johns Hopkins UniversityApplied Physics Laboratory and simulates the operation and electrical behavior of a pair of ASCs in real time via a combination of hardware and software. Testing included the following spacecraft electrical energy storage configurations: capacitive, battery, and supercapacitor. Testing of the DASCS and ACU in each energy storage configuration included simulation of a typical mission profile, and transient voltage and current data during load turn-on/turn-off. Testing for these devices also included the initiation of several system faults such as short circuits, electrical bus over-voltage, under-voltage and a dead bus recovery to restore normal power operations. The goal of this testing was to verify operation of the ACU(s) when connected to a spacecraft electrical bus.

  6. Facultative Lagoons. Instructor's Guide. Biological Treatment Process Control.

    ERIC Educational Resources Information Center

    Andersen, Lorri

    This instructor's guide contains materials needed to teach a two-lesson unit on the structure and components of facultative lagoons, the biological theory of their operation, and factors affecting their operation. Control testing recommendations, maintenance guidelines, and troubleshooting hints are also provided. These materials include: (1) an…

  7. Development of thermal control methods for specialized components and scientific instruments at very low temperatures (follow-on)

    NASA Technical Reports Server (NTRS)

    Wright, J. P.; Wilson, D. E.

    1976-01-01

    Many payloads currently proposed to be flown by the space shuttle system require long-duration cooling in the 3 to 200 K temperature range. Common requirements also exist for certain DOD payloads. Parametric design and optimization studies are reported for multistage and diode heat pipe radiator systems designed to operate in this temperature range. Also optimized are ground test systems for two long-life passive thermal control concepts operating under specified space environmental conditions. The ground test systems evaluated are ultimately intended to evolve into flight test qualification prototypes for early shuttle flights.

  8. Experimental Investigation of Mechanical Behavior of an Oxide/Oxide Ceramic Composite in Interlaminar Shear and under Combined Tension-Torsion Loading

    DTIC Science & Technology

    2014-03-27

    testing machine was warmed up for at least 30 min using a cyclic command with a sine waveform in displacement control . Gripping sections of each test...the test specimen was inserted into the susceptor. Then the testing machine is placed in displacement control and the top portion of the specimen...the MTS software also triggered the operation of the high speed cameras. 31 The testing system was placed in displacement /rotation control and the

  9. Space station propulsion test bed

    NASA Technical Reports Server (NTRS)

    Briley, G. L.; Evans, S. A.

    1989-01-01

    A test bed was fabricated to demonstrate hydrogen/oxygen propulsion technology readiness for the intital operating configuration (IOC) space station application. The test bed propulsion module and computer control system were delivered in December 1985, but activation was delayed until mid-1986 while the propulsion system baseline for the station was reexamined. A new baseline was selected with hydrogen/oxygen thruster modules supplied with gas produced by electrolysis of waste water from the space shuttle and space station. As a result, an electrolysis module was designed, fabricated, and added to the test bed to provide an end-to-end simulation of the baseline system. Subsequent testing of the test bed propulsion and electrolysis modules provided an end-to-end demonstration of the complete space station propulsion system, including thruster hot firings using the oxygen and hydrogen generated from electrolysis of water. Complete autonomous control and operation of all test bed components by the microprocessor control system designed and delivered during the program was demonstrated. The technical readiness of the system is now firmly established.

  10. Ground Data System Risk Mitigation Techniques for Faster, Better, Cheaper Missions

    NASA Technical Reports Server (NTRS)

    Catena, John J.; Saylor, Rick; Casasanta, Ralph; Weikel, Craig; Powers, Edward I. (Technical Monitor)

    2000-01-01

    With the advent of faster, cheaper, and better missions, NASA Projects acknowledged that a higher level of risk was inherent and accepted with this approach. It was incumbent however upon each component of the Project whether spacecraft, payload, launch vehicle, or ground data system to ensure that the mission would nevertheless be an unqualified success. The Small Explorer (SMEX) program's ground data system (GDS) team developed risk mitigation techniques to achieve these goals starting in 1989. These techniques have evolved through the SMEX series of missions and are practiced today under the Triana program. These techniques are: (1) Mission Team Organization--empowerment of a closeknit ground data system team comprising system engineering, software engineering, testing, and flight operations personnel; (2) Common Spacecraft Test and Operational Control System--utilization of the pre-launch spacecraft integration system as the post-launch ground data system on-orbit command and control system; (3) Utilization of operations personnel in pre-launch testing--making the flight operations team an integrated member of the spacecraft testing activities at the beginning of the spacecraft fabrication phase; (4) Consolidated Test Team--combined system, mission readiness and operations testing to optimize test opportunities with the ground system and spacecraft; and (5). Reuse of Spacecraft, Systems and People--reuse of people, software and on-orbit spacecraft throughout the SMEX mission series. The SMEX ground system development approach for faster, cheaper, better missions has been very successful. This paper will discuss these risk management techniques in the areas of ground data system design, implementation, test, and operational readiness.

  11. Transfer function tests of the Joy longwall shearer

    NASA Technical Reports Server (NTRS)

    Fisher, P. H., Jr.

    1978-01-01

    A series of operational tests was performed on the Joy longwall shearer located at the Bureau of Mines in Bructon, Pennsylvania. The purpose of these tests was to determine the transfer function and operational characteristics of the system. These characteristics will be used to generate a simulation model of the longwall shearer used in the development of the closed-loop vertical control system.

  12. 49 CFR 239.301 - Operational (efficiency) tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PASSENGER TRAIN EMERGENCY PREPAREDNESS Operational (Efficiency...-board and control center employees to determine the extent of compliance with its emergency preparedness...

  13. An approach to the design of operations systems

    NASA Technical Reports Server (NTRS)

    Chafin, Roy L.; Curran, Patrick S.

    1993-01-01

    The MultiMission Control Team (MMCT) consists of mission controllers which provides Real-Time operations support for the Mars Observer project. The Real-Time Operations task is to insure the integrity of the ground data system, to insure that the configuration is correct to support the mission, and to monitor the spacecraft for the Spacecraft Team. Operations systems are typically developed by adapting operations systems from previous projects. Problems tend to be solved empirically when they are either anticipated or observed in testing. This development method has worked in the past when time was available for extensive Ops testing. In the present NASA budget environment, a more cost conscious design approach has become necessary. Cost is a concern because operations is an ongoing, continuous activity. Reducing costs entails reducing staff. Reducing staffing levels potentially increases the risk of mission failure. Therefore, keeping track of the risk level is necessary.

  14. Update on the DIII-D ECH system: experiments, gyrotrons, advanced diagnostics, and controls

    NASA Astrophysics Data System (ADS)

    Lohr, John; Brambila, Rigoberto; Cengher, Mirela; Gorelov, Yuri; Grosnickle, William; Moeller, Charles; Ponce, Dan; Torrezan, Antonio; Ives, Lawrence; Reed, Michael; Blank, Monica; Felch, Kevin; Parisuaña, Claudia; LeViness, Alexandra

    2017-08-01

    The ECH system on DIII-D is continuing to be upgraded, while simultaneously being operated nearly daily for plasma experiments. The latest major hardware addition is a new 117.5 GHz gyrotron, which generated 1.7 MW for short pulses during factory testing. A new gyrotron control system based on Field Programmable Gate Array (FPGA) technology with very high speed system data acquisition has significantly increased the flexibility and reliability of individual gyrotron operation. We have improved the performance of the fast mirror scanning, both by increasing the scan speeds and by adding new algorithms for controlling the aiming using commands generated by the Plasma Control System (PCS). The system is used for transport studies, ELM control, current profile control, non-inductive current generation, suppression of MHD modes, startup assist, plasma density control, and other applications. A program of protective measures, which has been in place for more than two years, has eliminated damage to hardware and diagnostics caused by overdense operation. Other activities not directly related to fusion research have used the ECH system to test components, study methods for improving production of semiconductor junctions and materials, and test the feasibility of using ground based microwave systems to power satellites into orbit.

  15. Development of the integrated control system for the microwave ion source of the PEFP 100-MeV proton accelerator

    NASA Astrophysics Data System (ADS)

    Song, Young-Gi; Seol, Kyung-Tae; Jang, Ji-Ho; Kwon, Hyeok-Jung; Cho, Yong-Sub

    2012-07-01

    The Proton Engineering Frontier Project (PEFP) 20-MeV proton linear accelerator is currently operating at the Korea Atomic Energy Research Institute (KAERI). The ion source of the 100-MeV proton linac needs at least a 100-hour operation time. To meet the goal, we have developed a microwave ion source that uses no filament. For the ion source, a remote control system has been developed by using experimental physics and the industrial control system (EPICS) software framework. The control system consists of a versa module europa (VME) and EPICS-based embedded applications running on a VxWorks real-time operating system. The main purpose of the control system is to control and monitor the operational variables of the components remotely and to protect operators from radiation exposure and the components from critical problems during beam extraction. We successfully performed the operation test of the control system to confirm the degree of safety during the hardware performance.

  16. Extended test of a xenon hollow cathode for a space plasma contactor

    NASA Technical Reports Server (NTRS)

    Sarver-Verhey, Timothy R.

    1994-01-01

    Implementation of a hollow cathode plasma contactor for charge control on the Space Station has required validation of long-life hollow cathodes. A test series of hollow cathodes and hollow cathode plasma contactors was initiated as part of the plasma contactor development program. An on-going wear-test of a hollow cathode has demonstrated cathode operation in excess of 4700 hours with small changes in operating parameters. The discharge experienced 4 shutdowns during the test, all of which were due to test facility failures or expellant replenishment. In all cases, the cathode was reignited at approximately 42 volts and resumed typical operation. This test represents the longest demonstrated stable operation of a high current (greater than 1A) xenon hollow cathode reported to date.

  17. Verification testing of the PKI collector at Sandia National Laboratories, Albuquerque, New Mexico

    NASA Technical Reports Server (NTRS)

    Hauger, J. S.; Pond, S. L.

    1982-01-01

    Verification testing of a solar collector was undertaken prior to its operation as part of an industrial process heat plant at Capitol Concrete Products in Topeka, Kansas. Testing was performed at a control plant installed at Sandia National Laboratory, Albuquerque, New Mexico (SNLA). Early results show that plant performance is even better than anticipated and far in excess of test criteria. Overall plant efficiencies of 65 to 80 percent were typical during hours of good insolation. A number of flaws and imperfections were detected during operability testing, the most important being a problem in elevation drive alignment due to a manufacturing error. All problems were corrected as they occurred and the plant, with over 40 hours of operation, is currently continuing operability testing in a wholly-automatic mode.

  18. Verification testing of the PKI collector at Sandia National Laboratories, Albuquerque, New Mexico

    NASA Astrophysics Data System (ADS)

    Hauger, J. S.; Pond, S. L.

    1982-07-01

    Verification testing of a solar collector was undertaken prior to its operation as part of an industrial process heat plant at Capitol Concrete Products in Topeka, Kansas. Testing was performed at a control plant installed at Sandia National Laboratory, Albuquerque, New Mexico (SNLA). Early results show that plant performance is even better than anticipated and far in excess of test criteria. Overall plant efficiencies of 65 to 80 percent were typical during hours of good insolation. A number of flaws and imperfections were detected during operability testing, the most important being a problem in elevation drive alignment due to a manufacturing error. All problems were corrected as they occurred and the plant, with over 40 hours of operation, is currently continuing operability testing in a wholly-automatic mode.

  19. Continuing life test of a xenon hollow cathode for a space plasma contactor

    NASA Technical Reports Server (NTRS)

    Sarver-Verhey, Timothy R.

    1994-01-01

    Implementation of a hollow cathode plasma contactor for charge control on the Space Station has required validation of long-life hollow cathodes. A test series of hollow cathodes and hollow cathode plasma contactors was initiated as part of the plasma contactor development program. An on-going wear-test of a hollow cathode has demonstrated cathode operation in excess of 10,000 hours with small changes in operating parameters. The discharge has experienced 10 shutdowns during the test, all of which were due to test facility failures or expellant replenishment. In all cases, the cathode was re-ignited at approximately 42 volts and resumed typical operation. This test represents the longest demonstrated stable operation of a high current (greater than 1 A) xenon hollow cathode reported to date.

  20. 40 CFR Table 4 to Subpart Xxxx of... - Operating Limits for Puncture Sealant Application Control Devices

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... performance test. 2. Carbon adsorber (regenerative) to which puncture sealant application spray booth emissions are ducted a. Maintain the total regeneration mass, volumetric flow, and carbon bed temperature at the operating range established during the performance test.b. Reestablish the carbon bed temperature...

  1. EBR-II high-ramp transients under computer control

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Forrester, R.J.; Larson, H.A.; Christensen, L.J.

    1983-01-01

    During reactor run 122, EBR-II was subjected to 13 computer-controlled overpower transients at ramps of 4 MWt/s to qualify the facility and fuel for transient testing of LMFBR oxide fuels as part of the EBR-II operational-reliability-testing (ORT) program. A computer-controlled automatic control-rod drive system (ACRDS), designed by EBR-II personnel, permitted automatic control on demand power during the transients.

  2. Evaluation of the intelligent cruise control system : volume 1 : study results

    DOT National Transportation Integrated Search

    1999-10-01

    The Intelligent Cruise Control (ICC) system evaluation was based on an ICC Field Operational Test (FOT) performed in Michigan. The FOT involved 108 volunteers recruited to drive ten ICC-equipped Chrysler Concordes. Testing was initiated in July 1996 ...

  3. Diesel engine torsional vibration control coupling with speed control system

    NASA Astrophysics Data System (ADS)

    Guo, Yibin; Li, Wanyou; Yu, Shuwen; Han, Xiao; Yuan, Yunbo; Wang, Zhipeng; Ma, Xiuzhen

    2017-09-01

    The coupling problems between shafting torsional vibration and speed control system of diesel engine are very common. Neglecting the coupling problems sometimes lead to serious oscillation and vibration during the operation of engines. For example, during the propulsion shafting operation of a diesel engine, the oscillation of engine speed and the severe vibration of gear box occur which cause the engine is unable to operate. To find the cause of the malfunctions, a simulation model coupling the speed control system with the torsional vibration of deformable shafting is proposed and investigated. In the coupling model, the shafting is simplified to be a deformable one which consists of several inertias and shaft sections and with characteristics of torsional vibration. The results of instantaneous rotation speed from this proposed model agree with the test results very well and are successful in reflecting the real oscillation state of the engine operation. Furthermore, using the proposed model, the speed control parameters can be tuned up to predict the diesel engine a stable and safe running. The results from the tests on the diesel engine with a set of tuned control parameters are consistent with the simulation results very well.

  4. 76 FR 30043 - Airworthiness Directives; The Boeing Company Model 757 Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-24

    ... requires doing an additional adjustment test of the re-located control wheel position sensor, and an... service information specifies doing an operational test of the spoiler/speedbrake control system. These... and Bond 12 work-hours x $85 per 0 1,020 699,720 Tests, Groups 1-5 Configuration 2. hour = $1,020...

  5. Remote control circuit breaker evaluation testing. [for space shuttles

    NASA Technical Reports Server (NTRS)

    Bemko, L. M.

    1974-01-01

    Engineering evaluation tests were performed on several models/types of remote control circuit breakers marketed in an attempt to gain some insight into their potential suitability for use on the space shuttle vehicle. Tests included the measurement of several electrical and operational performance parameters under laboratory ambient, space simulation, acceleration and vibration environmental conditions.

  6. Software for real-time control of a tidal liquid ventilator.

    PubMed

    Heckman, J L; Hoffman, J; Shaffer, T H; Wolfson, M R

    1999-01-01

    The purpose of this project was to develop and test computer software and control algorithms designed to operate a tidal liquid ventilator. The tests were executed on a 90-MHz Pentium PC with 16 MB RAM and a prototype liquid ventilator. The software was designed using Microsoft Visual C++ (Ver. 5.0) and the Microsoft Foundation Classes. It uses a graphic user interface, is multithreaded, runs in real time, and has a built-in simulator that facilitates user education in liquid-ventilation principles. The operator can use the software to specify ventilation parameters such as the frequency of ventilation, the tidal volume, and the inspiratory-expiratory time ratio. Commands are implemented via control of the pump speed and by setting the position of two two-way solenoid-controlled valves. Data for use in monitoring and control are gathered by analog-to-digital conversion. Control strategies are implemented to maintain lung volumes and airway pressures within desired ranges, according to limits set by the operator. Also, the software allows the operator to define the shape of the flow pulse during inspiration and expiration, and to optimize perfluorochemical liquid transfer while minimizing airway pressures and maintaining the desired tidal volume. The operator can stop flow during inspiration and expiration to measure alveolar pressures. At the end of expiration, the software stores all user commands and 30 ventilation parameters into an Excel spreadsheet for later review and analysis. Use of these software and control algorithms affords user-friendly operation of a tidal liquid ventilator while providing precise control of ventilation parameters.

  7. Prototyping Control and Data Acquisition for the ITER Neutral Beam Test Facility

    NASA Astrophysics Data System (ADS)

    Luchetta, Adriano; Manduchi, Gabriele; Taliercio, Cesare; Soppelsa, Anton; Paolucci, Francesco; Sartori, Filippo; Barbato, Paolo; Breda, Mauro; Capobianco, Roberto; Molon, Federico; Moressa, Modesto; Polato, Sandro; Simionato, Paola; Zampiva, Enrico

    2013-10-01

    The ITER Neutral Beam Test Facility will be the project's R&D facility for heating neutral beam injectors (HNB) for fusion research operating with H/D negative ions. Its mission is to develop technology to build the HNB prototype injector meeting the stringent HNB requirements (16.5 MW injection power, -1 MeV acceleration energy, 40 A ion current and one hour continuous operation). Two test-beds will be built in sequence in the facility: first SPIDER, the ion source test-bed, to optimize the negative ion source performance, second MITICA, the actual prototype injector, to optimize ion beam acceleration and neutralization. The SPIDER control and data acquisition system is under design. To validate the main architectural choices, a system prototype has been assembled and performance tests have been executed to assess the prototype's capability to meet the control and data acquisition system requirements. The prototype is based on open-source software frameworks running under Linux. EPICS is the slow control engine, MDSplus is the data handler and MARTe is the fast control manager. The prototype addresses low and high-frequency data acquisition, 10 kS/s and 10 MS/s respectively, camera image acquisition, data archiving, data streaming, data retrieval and visualization, real time fast control with 100 μs control cycle and supervisory control.

  8. The Thirty Meter Telescope site testing robotic computer system

    NASA Astrophysics Data System (ADS)

    Riddle, Reed L.; Schöck, Matthias; Skidmore, Warren

    2006-06-01

    The Thirty Meter Telescope (TMT) project is currently testing six remote sites as candidates for the final location of the telescope. Each site has several instruments, including seeing monitors, weather stations, and turbulence profile measuring systems, each of which is computer controlled. As the sites are remote (usually hours from the nearest town), they requires a system that can control the operations of all the varied subsystems, keep the systems safe from damage and recover from errors during operation. The robotic system must also be robust enough to operate without human intervention and when internet connections are lost. It is also critical that a data archiving system diligently records all data as gathered. This paper is a discussion of the TMT site testing robotic computer system as implemented.

  9. 40 CFR 76.14 - Monitoring, recordkeeping, and reporting.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... installed NOX emission control system to the owner or operator showing that such system was designed to meet... performance of the NOX emission control system that were not included in the design specifications and... control system during the demonstration period. The tests shall include tests in § 76.15, which may be...

  10. 40 CFR 76.14 - Monitoring, recordkeeping, and reporting.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... installed NOX emission control system to the owner or operator showing that such system was designed to meet... performance of the NOX emission control system that were not included in the design specifications and... control system during the demonstration period. The tests shall include tests in § 76.15, which may be...

  11. Operational experience from LCLS-II cryomodule testing

    NASA Astrophysics Data System (ADS)

    Wang, R.; Hansen, B.; White, M.; Hurd, J.; Atassi, O. Al; Bossert, R.; Pei, L.; Klebaner, A.; Makara, J.; Theilacker, J.; Kaluzny, J.; Wu, G.; Harms, E.

    2017-12-01

    This paper describes the initial operational experience gained from testing Linac Coherent Light Source II (LCLS-II) cryomodules at Fermilab’s Cryomodule Test Facility (CMTF). Strategies for a controlled slow cooldown to 100 K and a fast cooldown past the niobium superconducting transition temperature of 9.2 K will be described. The test stand for the cryomodules at CMTF is sloped to match gradient in the LCLS-II tunnel at Stanford Linear Accelerator (SLAC) laboratory, which adds an additional challenge to stable liquid level control. Control valve regulation, Superconducting Radio-Frequency (SRF) power compensation, and other methods of stabilizing liquid level and pressure in the cryomodule 2.0 K SRF cavity circuit will be discussed. Several different pumping configurations using cold compressors and warm vacuum pumps have been used on the cryomodule 2.0 K return line and the associated results will be described.

  12. Performance characterization tests of three 0.44-N (0.1 lbf) hydrazine catalytic thrusters

    NASA Technical Reports Server (NTRS)

    Moynihan, P. I.; Bjorklund, R. A.

    1973-01-01

    The 0.44-N (0.1-lbf) class of hydrazine catalytic thruster has been evaluated to assess its capability for spacecraft limit-cycle attitude control with thruster pulse durations on the order of 10 milliseconds. Dynamic-environment and limit-cycle simulation tests were performed on three commercially available thruster/valve assemblies, purchased from three different manufacturers. The results indicate that this class of thruster can sustain a launch environment and, when properly temperature-conditioned, can perform limit-cycle operations over the anticipated life span of a multi-year mission. The minimum operating temperature for very short pulse durations was determined for each thruster. Pulsing life tests were then conducted on each thruster under a thermally controlled condition which maintained the catalyst bed at both a nominal 93 C (200 F) and 205 C (400 F). These were the temperatures believed to be slightly below and very near the minimum recommended operating temperature, respectively. The ensuing life tests ranged from 100,000 to 250,000 pulses at these temperatures, as would be required for spacecraft limit-cycle attitude control applications.

  13. Novel Transparent Urinary Tract Simulator Improves Teaching of Urological Operation Skills at a Single Institution.

    PubMed

    Zhong, Xiao; Wang, Pingxian; Feng, Jiayu; Hu, Wengang; Huang, Chibing

    2015-01-01

    This randomized controlled study compared a novel transparent urinary tract simulator with the traditional opaque urinary tract simulator as an aid for efficiently teaching urological surgical procedures. Senior medical students were tested on their understanding of urological theory before and after lectures concerning urinary system disease. The students received operative training using the transparent urinary tract simulator (experimental group, n = 80) or the J3311 opaque plastic urinary tract simulator (control, n = 80), specifically in catheterization and retrograde double-J stent implantation. The operative training was followed by a skills test and student satisfaction survey. The test scores for theory were similar between the two groups, before and after training. Students in the experimental group performed significantly better than those in the control group on the procedural skills test, and also had significantly better self-directed learning skills, analytical skills, and greater motivation to learn. During the initial step of training, the novel transparent urinary tract simulator significantly improved the efficiency of teaching urological procedural skills compared with the traditional opaque device. © 2015 S. Karger AG, Basel.

  14. An automated environment for multiple spacecraft engineering subsystem mission operations

    NASA Technical Reports Server (NTRS)

    Bahrami, K. A.; Hioe, K.; Lai, J.; Imlay, E.; Schwuttke, U.; Hsu, E.; Mikes, S.

    1990-01-01

    Flight operations at the Jet Propulsion Laboratory (JPL) are now performed by teams of specialists, each team dedicated to a particular spacecraft. Certain members of each team are responsible for monitoring the performances of their respective spacecraft subsystems. Ground operations, which are very complex, are manual, labor-intensive, slow, and tedious, and therefore costly and inefficient. The challenge of the new decade is to operate a large number of spacecraft simultaneously while sharing limited human and computer resources, without compromising overall reliability. The Engineering Analysis Subsystem Environment (EASE) is an architecture that enables fewer controllers to monitor and control spacecraft engineering subsystems. A prototype of EASE has been installed in the JPL Space Flight Operations Facility for on-line testing. This article describes the underlying concept, development, testing, and benefits of the EASE prototype.

  15. Thermal performance of a multi-evaporator loop heat pipe with thermal masses and thermal electrical coolers

    NASA Technical Reports Server (NTRS)

    Ku, Jentung; Ottenstein, Laura; Birur, Gajanana

    2004-01-01

    This paper describes thermal performance of a loop heat pipe (LHP) with two evaporators and two condensers in ambient testing. Each evaporator has an outer diameter of 15mm and a length of 76mm, and has an integral compensation chamber (CC). An aluminum mass of 500 grams is attached to each evaporator to simulate the instrument mass. A thermal electric cooler (TEC) is installed on each CC to provide heating as well as cooling for CC temperature control. A flow regulator is installed in the condenser section to prevent vapor from going back to the evaporators in the event that one of condenser is fully utilized. Ammonia was used ad the working fluid. Tests conducted included start-up, power cycle, heat load sharing, sink temperature cycle, operating temperature control with TECs, and capillary limit tests. Experimental data showed that the loop could start with a heat load of less than 1OW even with added thermal masses. The loop operated stably with even and uneven evaporator heat loads, and even and uneven condenser sink temperatures. The operating temperature could be controlled within +/-0.5K of the set point temperature using either or both TECs, and the required TEC control heater power was less than 2W under most test conditions. Heat load sharing between the two evaporators was also successfully demonstrated. The loop had a heat transport capability of 120W to 140W, and could recover from a dry-out when the heat load was reduced. The 500-gram aluminum mass on each evaporator had a negligible effect on the loop operation. Existing LHPs servicing the orbiting spacecraft have a single evaporator with an outer diameter of about 25mm. Important performance characteristics demonstrated by this LHP included: 1) Operation of an LHP with 15mm diameter evaporators; 2) Robustness and reliability of an LHP with multiple evaporators and multiple condensers under various test conditions; 3) Heat load sharing among LHP evaporators; 4) Effectiveness of TECs in controlling the LHP operating temperature; and 5) Effectiveness of the flow regulator in preventing vapor from going back the evaporators.

  16. Thermal Performance of a Multi-Evaporator Loop Heat Pipe with Thermal Masses and Thermoelectric Coolers

    NASA Technical Reports Server (NTRS)

    Ku, Jen-Tung; Ottenstein, Laura; Birur, Gajanana

    2004-01-01

    This paper describes thermal performance of a loop heat pipe (LHP) with two evaporators and two condensers in ambient testing. Each evaporator has an outer diameter of 15mm and a length of 76mm, and has an integral compensation chamber (CC). An aluminum mass of 500 grams is attached to each evaporator to simulate the instrument mass. A thermoelectric cooler (TEC) is installed on each CC to provide heating as well as cooling for CC temperature control. A flow regulator is installed in the condenser section to prevent vapor from going back to the evaporators in the event that one of the condensers is fully utilized. Ammonia was used as the working fluid. Tests conducted included start-up, power cycle, heat load sharing, sink temperature cycle, operating temperature control with TECs, and capillary limit tests. Experimental data showed that the loop could start with a heat load of less than 10W even with added thermal masses. The loop operated stably with even and uneven evaporator heat loads, and even and uneven condenser sink temperatures. The operating temperature could be controlled within +/- 0.5K of the set point temperature using either or both TECs, and the required TEC control heater power was less than 2W under most test conditions. Heat load sharing between the two evaporators was also successfully demonstrated. The loop had a heat transport capability of 120W to 140W, and could recover from a dry-out when the heat load was reduced. The 500-gram aluminum mass on each evaporator had a negligible effect on the loop operation. Existing LHPs servicing orbiting spacecraft have a single evaporator with an outer diameter of about 25mm. Important performance characteristics demonstrated by this LHP included: 1) Operation of an LHP with 15mm diameter evaporators; 2) Robustness and reliability of an LHP with multiple evaporators and multiple condensers under various test conditions; 3) Heat load sharing among LHP evaporators; 4) Effectiveness of TECs in controlling the LHP operating temperature; and 5 ) Effectiveness of the flow regulator in preventing vapor from going back the evaporators.

  17. Aquatic Plant Control Research Program. Large-Scale Operations Management Test (LSOMT) of Insects and Pathogens for Control of Waterhyacinth in Louisiana. Volume 1. Results for 1979-1981.

    DTIC Science & Technology

    1985-01-01

    RD-Ai56 759 AQUATIC PLANT CONTROL RESEARCH PROGRAM LARGE-SCALE 1/2 OPERATIONS MRNAGEMENT..(U) ARMY ENGINEER WATERAYS EXPERIMENT STATION VICKSBURG MS...PO Box 631, Vicksburg, Aquatic Plant Control Mississippi 39180-0631 and University of Research Program Tennessee-Chattanooga, Chattanooga, 12...19. KEY WORDS (Continue on reverse side if necesary nd identify by block number) - Aquatic plant control Louisiana Biological control Plant

  18. Basic characteristics and realization of production system control

    NASA Astrophysics Data System (ADS)

    Cheng, Shaopeng; Shell, Richard; Hall, Ernest L.

    1992-11-01

    This paper analyzes the issues involved in developing an intelligent production control system. It describes the basic characteristics of a production control system and an effective design methodology to realize the production control functions. Petri net, subsystem and hierarchical control concepts are applied to a computer integrated material handling system (MHS). Some communication and interface requirements of the MHS are also considered in this paper. The control system solution is illustrated with an actual MHS operation case which indicates that a truly flexible and integrated production system can be realized with a Petri net operation model and a hierarchical control structure. The significance of this work is related to the different operation testing and evaluation requirements encountered in manufacturing.

  19. Acoustic Aspects of Active-Twist Rotor Control

    NASA Technical Reports Server (NTRS)

    Booth, Earl R., Jr.; Wilbur, Matthew L.

    2002-01-01

    The use of an Active Twist Rotor system to provide both vibration reduction and performance enhancement has been explored in recent analytical and experimental studies. Effects of active-twist control on rotor noise, however, had not been determined. During a recent wind tunnel test of an active-twist rotor system, a set of acoustic measurements were obtained to assess the effects of active-twist control on noise produced by the rotor, especially blade-vortex interaction (BVI) noise. It was found that for rotor operating conditions where BVI noise is dominant, active-twist control provided a reduction in BVI noise level. This BVI noise reduction was almost, but not quite, as large as that obtained in a similar test using HHC. However, vibration levels were usually adversely affected at operating conditions favoring minimum BVI noise. Conversely, operating conditions favoring minimum vibration levels affected BVI noise levels, but not always adversely.

  20. Flight-test of the glide-slope track and flare-control laws for an automatic landing system for a powered-lift STOL airplane

    NASA Technical Reports Server (NTRS)

    Watson, D. M.; Hardy, G. H.; Warner, D. N., Jr.

    1983-01-01

    An automatic landing system was developed for the Augmentor Wing Jet STOL Research Airplane to establish the feasibility and examine the operating characteristics of a powered-lift STOL transport flying a steep, microwave landing system (MLS) glide slope to automatically land on a STOL port. The flight test results address the longitudinal aspects of automatic powered lift STOL airplane operation including glide slope tracking on the backside of the power curve, flare, and touchdown. Three different autoland control laws were evaluated to demonstrate the tradeoff between control complexity and the resulting performance. The flight test and simulation methodology used in developing conventional jet transport systems was applied to the powered-lift STOL airplane. The results obtained suggest that an automatic landing system for a powered-lift STOL airplane operating into an MLS-equipped STOL port is feasible. However, the airplane must be provided with a means of rapidly regulation lift to satisfactorily provide the glide slope tracking and control of touchdown sink rate needed for automatic landings.

  1. Method for Controlling Space Transportation System Life Cycle Costs

    NASA Technical Reports Server (NTRS)

    McCleskey, Carey M.; Bartine, David E.

    2006-01-01

    A structured, disciplined methodology is required to control major cost-influencing metrics of space transportation systems during design and continuing through the test and operations phases. This paper proposes controlling key space system design metrics that specifically influence life cycle costs. These are inclusive of flight and ground operations, test, and manufacturing and infrastructure. The proposed technique builds on today's configuration and mass properties control techniques and takes on all the characteristics of a classical control system. While the paper does not lay out a complete math model, key elements of the proposed methodology are explored and explained with both historical and contemporary examples. Finally, the paper encourages modular design approaches and technology investments compatible with the proposed method.

  2. Commercialization of the power factor controller

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The purpose of the Motor Power Controller, also known as the Power Factor Controller, is to improve power factor and reduce power dissipation in induction motors operating below full load. These purposes were studied and tested in detail. The Motor Power Controller is capable of raising power factors from 0.2 to 0.8 and results in energy savings. It was found that many motors, in their present operating applications, are classified as unstable. The electronic nature of the controller vs. the electrical nature of the motor, compound this problem due to the differences in response time of the two devices. Many tests were successfully completed, the most indicating greater savings than anticipated. Also, there was an effect on efficiency which was not included in the calculations.

  3. Optimal Discrete Event Supervisory Control of Aircraft Gas Turbine Engines

    NASA Technical Reports Server (NTRS)

    Litt, Jonathan (Technical Monitor); Ray, Asok

    2004-01-01

    This report presents an application of the recently developed theory of optimal Discrete Event Supervisory (DES) control that is based on a signed real measure of regular languages. The DES control techniques are validated on an aircraft gas turbine engine simulation test bed. The test bed is implemented on a networked computer system in which two computers operate in the client-server mode. Several DES controllers have been tested for engine performance and reliability.

  4. KSC-99pp0229

    NASA Image and Video Library

    1999-02-23

    KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building's high bay, the Rotation Handling Fixture (RHF), with a simulated module attached, is lowered by crane into the altitude chamber below during a test. Under normal operation, the RHF will hold a pressurized module intended for the International Space Station, depositing it into the altitude chamber for leak testing. The chamber was recently reactivated after a 24-year hiatus. Originally, two chambers were built to test Apollo Program flight hardware. They were last used in 1975 during the Apollo-Soyuz Test Project. In 1997, in order to increase the probability of successful missions aboard the ISS, NASA decided to perform leak tests on ISS pressurized modules at the launch site. After installation of new vacuum pumping equipment and controls, a new control room, and a new rotation and handling fixture, the chamber again became operational in February 1999. The chamber, which is 33 feet in diameter and 50 feet tall, is constructed of stainless steel. The rotation handling fixture is aluminum. The first module that will be tested for leaks is the U.S. Laboratory. No date has been determined for the test

  5. KSC-99pp0230

    NASA Image and Video Library

    1999-02-23

    KENNEDY SPACE CENTER, FLA. -- Viewed from inside the altitude chamber in the Operations and Checkout Building's high bay, the Rotation Handling Fixture (RHF), with a simulated module attached, is lowered during a test. Under normal operation, the RHF will hold a pressurized module intended for the International Space Station, depositing it into the altitude chamber for leak testing. The chamber was recently reactivated after a 24-year hiatus. Originally, two chambers were built to test Apollo Program flight hardware. They were last used in 1975 during the Apollo-Soyuz Test Project. In 1997, in order to increase the probability of successful missions aboard the ISS, NASA decided to perform leak tests on ISS pressurized modules at the launch site. After installation of new vacuum pumping equipment and controls, a new control room, and a new rotation and handling fixture, the chamber again became operational in February 1999. The chamber, which is 33 feet in diameter and 50 feet tall, is constructed of stainless steel. The rotation handling fixture is aluminum. The first module that will be tested for leaks is the U.S. Laboratory. No date has been determined for the test

  6. KSC-99pp0228

    NASA Image and Video Library

    1999-02-23

    KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building's high bay, a crane lifts the Rotation Handling Fixture (RHF) and simulated module during a test. Under normal operation, the RHF will hold a pressurized module intended for the International Space Station, lifting it up and into an altitude chamber for leak testing. The chamber was recently reactivated after a 24-year hiatus. Originally, two chambers were built to test Apollo Program flight hardware. They were last used in 1975 during the Apollo-Soyuz Test Project. In 1997, in order to increase the probability of successful missions aboard the ISS, NASA decided to perform leak tests on ISS pressurized modules at the launch site. After installation of new vacuum pumping equipment and controls, a new control room, and a new rotation and handling fixture, the chamber again became operational in February 1999. The chamber, which is 33 feet in diameter and 50 feet tall, is constructed of stainless steel. The rotation handling fixture is aluminum. The first module that will be tested for leaks is the U.S. Laboratory. No date has been determined for the test

  7. Payload Operations Support Team Tools

    NASA Technical Reports Server (NTRS)

    Askew, Bill; Barry, Matthew; Burrows, Gary; Casey, Mike; Charles, Joe; Downing, Nicholas; Jain, Monika; Leopold, Rebecca; Luty, Roger; McDill, David; hide

    2007-01-01

    Payload Operations Support Team Tools is a software system that assists in (1) development and testing of software for payloads to be flown aboard the space shuttles and (2) training of payload customers, flight controllers, and flight crews in payload operations

  8. Characterization of the Vectron PX-570 Crystal Oscillator for Use in Harsh Environments

    NASA Technical Reports Server (NTRS)

    Li, Jacob; Patterson, Richard L.; Hammoud, Ahmad

    2012-01-01

    Computing hardware, data-acquisition systems, communications systems, and many electronic control systems require well-controlled timing signals for proper and accurate operation. These signals are, in most cases, provided by circuits that employ crystal oscillators due to availability, cost, ease of operation, and accuracy. In some cases, the electronic systems are expected to survive and operate under harsh conditions that include exposure to extreme temperatures. These applications exist in terrestrial systems as well as in aerospace products. Well-logging, geothermal systems, and industrial process control are examples of ground-based applications, while distributed jet engine control in aircraft, space-based observatories (such as the James Webb Space Telescope), satellites, and lunar and planetary landers are typical environments where electronics are exposed to harsh operating conditions. To ensure these devices produce reliable results, the digital heartbeat from the oscillator must deliver a stable signal that is not affected by external temperature or other conditions. One such solution is a recently introduced commercial-off-the-shelf (COTS) oscillator, the PX-570 series from Vectron International. The oscillator was designed for high-temperature applications and as proof, the crystal oscillator was subjected to a wide suite of tests to determine its ruggedness for operation in harsh environments. The tests performed by Vectron included electrical characterization under wide range of temperature, accelerated life test/aging, shock and vibration, internal moisture analysis, ESD threshold, and latch-up testing. The parametric evaluation was performed on the oscillator's frequency, output signal rise and fall times, duty cycle, and supply current over the temperature range of -125 C to +230 C. The evaluations also determined the effects of thermal cycling and the oscillator's re-start capability at extreme hot and cold temperatures. These thermal cycling and restart tests were performed at the NASA Glenn Research Center. Overall, the crystal oscillator performed well and demonstrated very good frequency stability. This paper will discuss the test procedures and present details of the performance results.

  9. 10 CFR 55.45 - Operating tests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... significance of facility instrument readings. (5) Observe and safely control the operating behavior... equipment that could affect reactivity or the release of radioactive materials to the environment. (9...

  10. Actively controlled shaft seals for aerospace applications

    NASA Technical Reports Server (NTRS)

    Salant, Richard F.

    1993-01-01

    An electronically controlled mechanical seal for use as the purge gas seal in a liquid oxygen turbo pump has been fabricated and tested under transient operating conditions. The thickness of the lubricating film is controlled by adjusting the coning of the carbon face. This is accomplished by applying a voltage to a piezoelectric actuator to which the carbon face is bonded. The seal has been operated with a closed-loop control system that utilizes either the leakage rate or the seal face temperature as the feedback. Both speed and pressure transients have been imposed on the seal. The transient tests have demonstrated that the seal is capable of maintaining low leakage rates while limiting the face temperatures.

  11. Installation of PMV Operation Program in DDC Controller and Air Conditioning Control Using PMV Directly as Set Point

    NASA Astrophysics Data System (ADS)

    Haramoto, Ken-Ichi

    In general, air conditioning control in a building is operated mainly by indoor air temperature control. Although the operators of the machine in the building accepted a claim for indoor air temperature presented by the building inhabitants, the indoor conditions have been often too cool or warm. Therefore, in an attempt to create better thermal environments, the author paid attention to the PMV that is a thermal comfort index. And then, the possibility of air conditioning control using the PMV directly as the set point was verified by employing actual equipment in an air conditioning testing room and an office building. Prior to the execution of this control, the operation program of the PMV was installed in a DDC controller for the air conditioning control. And information from indoor sensors and so on was inputted to the controller, and the computed PMV was used as the feedback variable.

  12. Air cleaning performance of a new environmentally controlled primary crusher operator booth

    PubMed Central

    Organiscak, J.A.; Cecala, A.B.; Zimmer, J.A.; Holen, B.; Baregi, J.R.

    2016-01-01

    The National Institute for Occupational Safety and Health (NIOSH) cooperated with 3M Company in the design and testing of a new environmentally controlled primary crusher operator booth at the company’s Wausau granite quarry near Wausau, WI. This quarry had an older crusher booth without a central heating, ventilation and air conditioning (HVAC) system, and without an air filtration and pressurization system. A new replacement operator booth was designed and installed by 3M based on design considerations from past NIOSH research on enclosed cab filtration systems. NIOSH conducted pre-testing of the old booth and post-testing of the new booth to assess the new filtration and pressurization system’s effectiveness in controlling airborne dusts and particulates. The booth’s dust and particulate control effectiveness is described by its protection factor, expressed as a ratio of the outside to inside concentrations measured during testing. Results indicate that the old booth provided negligible airborne respirable dust protection and low particulate protection from the outside environment. The newly installed booth provided average respirable dust protection factors from 2 to 25 over five shifts of dust sampling with occasional worker ingress and egress from the booth, allowing some unfiltered contaminants to enter the enclosure. Shorter-term particle count testing outside and inside the booth under near-steady-state conditions, with no workers entering or exiting the booth, resulted in protection factors from 35 to 127 on 0.3- to 1.0-μm respirable size particulates under various HVAC airflow operating conditions. PMID:26937052

  13. An Integrated Chemical Reactor-Heat Exchanger Based on Ammonium Carbamate (POSTPRINT)

    DTIC Science & Technology

    2012-10-01

    With the scrubber and exhaust operating, the test cell ammonia concentration remains below 5 ppm. To further reduce NH3 release into the test cell...material has a high decomposition enthalpy and exhibits decomposition over a wide range of temperatures. AC decomposition produces ammonia and carbon...installation due to toxic gas ( ammonia ) generation during operation. Therefore, the experiment is intended to be remotely operated. A secondary control

  14. Reliability Testing Using the Vehicle Durability Simulator

    DTIC Science & Technology

    2017-11-20

    remote parameter control (RPC) software. The software is specifically designed for the data collection, analysis, and simulation processes outlined in...4516. 3. TOP 02-2-505 Inspection and Preliminary Operation of Vehicles, 4 February 1987. 4. Multi-Shaker Test and Control : Design , Test, and...currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. 1. REPORT DATE (DD-MM-YYYY) 20-11-2017 2. REPORT

  15. Terrain Characterization for Trafficability

    DTIC Science & Technology

    1993-06-01

    pensive and less time-consuming. Although carefully raphy, on vehicle operation. This report focuses on the controlled laboratory tests may be more...relating indentation to soil strength. on a portable test rig or on an off-road vehicle where it A series of controlled experiments to determine the is... Controls and setting values for hydraulic pressures and flow Figure 10. Wheel are test rig (after Wasterhund 1990). 7 Vertical Proximity L ock-Oit~u

  16. Neural network feedforward control of a closed-circuit wind tunnel

    NASA Astrophysics Data System (ADS)

    Sutcliffe, Peter

    Accurate control of wind-tunnel test conditions can be dramatically enhanced using feedforward control architectures which allow operating conditions to be maintained at a desired setpoint through the use of mathematical models as the primary source of prediction. However, as the desired accuracy of the feedforward prediction increases, the model complexity also increases, so that an ever increasing computational load is incurred. This drawback can be avoided by employing a neural network that is trained offline using the output of a high fidelity wind-tunnel mathematical model, so that the neural network can rapidly reproduce the predictions of the model with a greatly reduced computational overhead. A novel neural network database generation method, developed through the use of fractional factorial arrays, was employed such that a neural network can accurately predict wind-tunnel parameters across a wide range of operating conditions whilst trained upon a highly efficient database. The subsequent network was incorporated into a Neural Network Model Predictive Control (NNMPC) framework to allow an optimised output schedule capable of providing accurate control of the wind-tunnel operating parameters. Facilitation of an optimised path through the solution space is achieved through the use of a chaos optimisation algorithm such that a more globally optimum solution is likely to be found with less computational expense than the gradient descent method. The parameters associated with the NNMPC such as the control horizon are determined through the use of a Taguchi methodology enabling the minimum number of experiments to be carried out to determine the optimal combination. The resultant NNMPC scheme was employed upon the Hessert Low Speed Wind Tunnel at the University of Notre Dame to control the test-section temperature such that it follows a pre-determined reference trajectory during changes in the test-section velocity. Experimental testing revealed that the derived NNMPC controller provided an excellent level of control over the test-section temperature in adherence to a reference trajectory even when faced with unforeseen disturbances such as rapid changes in the operating environment.

  17. Geoscience Laser Altimeter System (GLAS) Final Test Report of DM LHP TV Testing

    NASA Technical Reports Server (NTRS)

    Baker, Charles

    2000-01-01

    Two loop heat pipes (LHPs) are to be used for thermal control of the Geoscience Laser Altimeter System (GLAS), planned for flight in 2001. One LHP will be used to transport 100 W from a laser to the radiator, the other will transport 210 W from electronic boxes to the radiator. In order to verify the LHP design for the GLAS application, an LHP Development Model has been fabricated, and ambient and thermal vacuum tested. Two aluminum blocks of 15 kg and 30 kg, respectively, were attached to the LHP to simulate the thermal masses connected to the heat sources. A 20 W starter heater was installed on the evaporator to aid the loop startup. A new concept to thermally couple the vapor and liquid line was also incorporated in the LHP design. Such a thermal coupling would reduce the power requirement on the compensation chamber in order to maintain the loop set point temperature. To avoid freezing of the liquid in the condenser during cold cases, propylene was selected as the working fluid. The LHP was tested under reflux mode and with adverse elevation. Tests conducted included start-up, power cycle, steady state and transient operation during hot and cold cases, and heater power requirements for the set point temperature control of the LHP. Test results showed very successful operation of the LHP under all conditions. The 20 W starter heater proved necessary in order to start the loop when a large thermal mass was attached to the evaporator. The thermal coupling between the liquid line and the vapor line significantly reduced the heater power required for loop temperature control, which was less than 5 watts in all cases, including a cold radiator. The test also demonstrated successful operation with a propylene working fluid, with successful startups with condenser temperatures as low as 100 C. Furthermore, the test demonstrated accurate control of the loop operating temperature within +/- 0.2 C, and a successful shutdown of the loop during the survival mode of operation.

  18. Recent Developments in the Design, Capabilities and Autonomous Operations of a Lightweight Surface Manipulation System and Test-bed

    NASA Technical Reports Server (NTRS)

    Dorsey, John T.; Jones, Thomas C.; Doggett, W. R.; Brady, Jeffrey S.; Berry, Felecia C.; Ganoe, George G.; Anderson, Eric; King, Bruce D.; Mercer, David C.

    2011-01-01

    The first generation of a versatile high performance device for performing payload handling and assembly operations on planetary surfaces, the Lightweight Surface Manipulation System (LSMS), has been designed and built. Over the course of its development, conventional crane type payload handling configurations and operations have been successfully demonstrated and the range of motion, types of operations and the versatility greatly expanded. This enhanced set of 1st generation LSMS hardware is now serving as a laboratory test-bed allowing the continuing development of end effectors, operational techniques and remotely controlled and automated operations. This paper describes the most recent LSMS and test-bed development activities, that have focused on two major efforts. The first effort was to complete a preliminary design of the 2nd generation LSMS that has the capability for limited mobility and can reposition itself between lander decks, mobility chassis, and fixed base locations. A major portion of this effort involved conducting a study to establish the feasibility of, and define, the specifications for a lightweight cable-drive waist joint. The second effort was to continue expanding the versatility and autonomy of large planetary surface manipulators using the 1st generation LSMS as a test-bed. This has been accomplished by increasing manipulator capabilities and efficiencies through both design changes and tool and end effector development. A software development effort has expanded the operational capabilities of the LSMS test-bed to include; autonomous operations based on stored paths, use of a vision system for target acquisition and tracking, and remote command and control over a communications bridge.

  19. Theoretical Tools and Software for Modeling, Simulation and Control Design of Rocket Test Facilities

    NASA Technical Reports Server (NTRS)

    Richter, Hanz

    2004-01-01

    A rocket test stand and associated subsystems are complex devices whose operation requires that certain preparatory calculations be carried out before a test. In addition, real-time control calculations must be performed during the test, and further calculations are carried out after a test is completed. The latter may be required in order to evaluate if a particular test conformed to specifications. These calculations are used to set valve positions, pressure setpoints, control gains and other operating parameters so that a desired system behavior is obtained and the test can be successfully carried out. Currently, calculations are made in an ad-hoc fashion and involve trial-and-error procedures that may involve activating the system with the sole purpose of finding the correct parameter settings. The goals of this project are to develop mathematical models, control methodologies and associated simulation environments to provide a systematic and comprehensive prediction and real-time control capability. The models and controller designs are expected to be useful in two respects: 1) As a design tool, a model is the only way to determine the effects of design choices without building a prototype, which is, in the context of rocket test stands, impracticable; 2) As a prediction and tuning tool, a good model allows to set system parameters off-line, so that the expected system response conforms to specifications. This includes the setting of physical parameters, such as valve positions, and the configuration and tuning of any feedback controllers in the loop.

  20. Implementation and on-sky results of an optimal wavefront controller for the MMT NGS adaptive optics system

    NASA Astrophysics Data System (ADS)

    Powell, Keith B.; Vaitheeswaran, Vidhya

    2010-07-01

    The MMT observatory has recently implemented and tested an optimal wavefront controller for the NGS adaptive optics system. Open loop atmospheric data collected at the telescope is used as the input to a MATLAB based analytical model. The model uses nonlinear constrained minimization to determine controller gains and optimize the system performance. The real-time controller performing the adaptive optics close loop operation is implemented on a dedicated high performance PC based quad core server. The controller algorithm is written in C and uses the GNU scientific library for linear algebra. Tests at the MMT confirmed the optimal controller significantly reduced the residual RMS wavefront compared with the previous controller. Significant reductions in image FWHM and increased peak intensities were obtained in J, H and K-bands. The optimal PID controller is now operating as the baseline wavefront controller for the MMT NGS-AO system.

  1. Description and theory of operation of the computer by-pass system for the NASA F-8 digital fly-by-wire control system

    NASA Technical Reports Server (NTRS)

    1978-01-01

    A triplex digital flight control system was installed in a NASA F-8C airplane to provide fail operate, full authority control. The triplex digital computers and interface circuitry process the pilot commands and aircraft motion feedback parameters according to the selected control laws, and they output the surface commands as an analog signal to the servoelectronics for position control of the aircraft's power actuators. The system and theory of operation of the computer by pass and servoelectronics are described and an automated ground test for each axis is included.

  2. Experimental Investigation of Diffuser Pressure-ratio Control with Shock-positioning Limit on 28-inch Ram-jet Engine

    NASA Technical Reports Server (NTRS)

    Dunbar, William R; Wentworth, Carl B; Crowl, Robert J

    1957-01-01

    The performance of a control system designed for variable thrust applications was determined in an altitude free-jet facility at various Mach numbers, altitudes and angles of attack for a wide range of engine operation. The results are presented as transient response characteristics for step disturbances in fuel flow and stability characteristics as a function of control constants and engine operating conditions. The results indicate that the control is capable of successful operation over the range of conditions tested, although variations in engine gains preclude optimum response characteristics at all conditions with fixed control constants.

  3. Effect of Ablation of Area Postrema on Frequency and Latency of Motion Sickness-Induced Emesis in the Squirrel Monkey

    NASA Technical Reports Server (NTRS)

    Brizzee, K. R.; Ordy, J. M.; Mehler, W. R.

    1980-01-01

    Twelve young adult squirrel monkeys of the Bolivian subspecies were subjected to continuous counter-clockwise horizontal rotary motion at 25 rpm, together with a sinusoidal vertical excursion of 6 in. every 2 sec (0.5 Hz). Each animal was exposed to this motion regimen for a period of 60 min once each week for three consecutive weeks. Following the third weekly motion test bilateral ablation of the Area Postrema (AP) was performed in eight of the animals by thermal cautery. Two control animals were sham-operated after the third motion test while two additional controls were given the motion tests as noted above but were not operated. The four controls were considered as a single group for statistical analyses of results of the motion tests. After a recovery period of 30 to 40 days, and at a comparable interval in the non-operated controls, each animal was again tested for motion sensitivity for three consecutive weeks. The brains of all of the animals were then fixed by left ventriculal cardiac perfusion with Bouin's fluid and processed for histological evaluation of the bilateral AP ablation in comparison with the control brains. Five of the AP-ablated animals postoperatively were completely refractory to the motion stimuli, two exhibited a decreased number of emetic responses, and one exhibited the same number of responses before and after the AP lesions. The controls exhibited no significant difference in emetic sensitivity on the second series of three weekly tests than on the first series. The results of this investigation appear to be in agreement with the observations of Wang and Chinn in the dog indicating that the integrity of the AP (CTZ) is essential to the emetic response to motion.

  4. KSC-2009-5248

    NASA Image and Video Library

    2009-09-25

    CAPE CANAVERAL, Fla. – This ribbon cutting officially turns over NASA Kennedy Space Center's Launch Control Center Firing Room 1 from the Space Shuttle Program to the Constellation Program. Participating are (from left) Pepper Phillips, director of the Constellation Project Office at Kennedy; Bob Cabana, Kennedy's director; Robert Crippen, former astronaut; Jeff Hanley, manager of the Constellation Program at NASA's Johnson Space Center; and Nancy Bray, deputy director of Center Operations at Kennedy. The room has undergone demolition and construction and been outfitted with consoles for the upcoming Ares I-X rocket flight test targeted for launch on Oct. 27. As the center of launch operations at Kennedy since the Apollo Program, the Launch Control Center, or LCC, has played a central role in NASA's human spaceflight programs. Firing Room 1 was the first operational firing room constructed. From this room, controllers launched the first Saturn V, the first crewed flight of Saturn V, the first crewed mission to the moon and the first space shuttle. Firing Room 1 will continue this tradition of firsts when controllers launch the Constellation Program's first flight test. Also, this firing room will be the center of operations for the upcoming Ares I and Orion operations. Photo credit: NASA/Kim Shiflett

  5. Reactor Simulator Testing

    NASA Technical Reports Server (NTRS)

    Schoenfeld, Michael P.; Webster, Kenny L.; Pearson, Boise Jon

    2013-01-01

    As part of the Nuclear Systems Office Fission Surface Power Technology Demonstration Unit (TDU) project, a reactor simulator test loop (RxSim) was design & built to perform integrated testing of the TDU components. In particular, the objectives of RxSim testing was to verify the operation of the core simulator, the instrumentation and control system, and the ground support gas and vacuum test equipment. In addition, it was decided to include a thermal test of a cold trap purification design and a pump performance test at pump voltages up to 150 V since the targeted mass flow rate of 1.75 kg/s was not obtained in the RxSim at the originally constrained voltage of 120 V. This paper summarizes RxSim testing. The gas and vacuum ground support test equipment performed effectively in NaK fill, loop pressurization, and NaK drain operations. The instrumentation and control system effectively controlled loop temperature and flow rates or pump voltage to targeted settings. The cold trap design was able to obtain the targeted cold temperature of 480 K. An outlet temperature of 636 K was obtained which was lower than the predicted 750 K but 156 K higher than the cold temperature indicating the design provided some heat regeneration. The annular linear induction pump (ALIP) tested was able to produce a maximum flow rate of 1.53 kg/s at 800 K when operated at 150 V and 53 Hz. Keywords: fission, space power, nuclear, liquid metal, NaK.

  6. SPOT satellite family: Past, present, and future of the operations in the mission and control center

    NASA Technical Reports Server (NTRS)

    Philippe, Pacholczyk

    1993-01-01

    SPOT sun-synchronous remote sensing satellites are operated by CNES since February 1986. Today, the SPOT mission and control center (CCM) operates SPOT1, SPOT2, and is ready to operate SPOT3. During these seven years, the way to operate changed and the CCM, initially designed for the control of one satellite, has been modified and upgraded to support these new operating modes. All these events have shown the performances and the limits of the system. A new generation of satellite (SPOT4) will continue the remote sensing mission during the second half of the 90's. Its design takes into account the experience of the first generation and supports several improvements. A new generation of control center (CMP) has been developed and improves the efficiency, quality, and reliability of the operations. The CMP is designed for operating two satellites at the same time during launching, in-orbit testing, and operating phases. It supports several automatic procedures and improves data retrieval and reporting.

  7. Cassini Attitude Control Flight Software: from Development to In-Flight Operation

    NASA Technical Reports Server (NTRS)

    Brown, Jay

    2008-01-01

    The Cassini Attitude and Articulation Control Subsystem (AACS) Flight Software (FSW) has achieved its intended design goals by successfully guiding and controlling the Cassini-Huygens planetary mission to Saturn and its moons. This paper describes an overview of AACS FSW details from early design, development, implementation, and test to its fruition of operating and maintaining spacecraft control over an eleven year prime mission. Starting from phases of FSW development, topics expand to FSW development methodology, achievements utilizing in-flight autonomy, and summarize lessons learned during flight operations which can be useful to FSW in current and future spacecraft missions.

  8. MCCx C3I Control Center Interface Emulator

    NASA Technical Reports Server (NTRS)

    Mireles, James R.

    2010-01-01

    This slide presentation reviews the project to develop and demonstrate alternate Information Technologies and systems for new Mission Control Centers that will reduce the cost of facility development, maintenance and operational costs and will enable more efficient cost and effective operations concepts for ground support operations. The development of a emulator for the Control Center capability will enable the facilities to conduct the simulation requiring interactivity with the Control Center when it is off line or unavailable, and it will support testing of C3I interfaces for both command and telemetry data exchange messages (DEMs).

  9. Implementation and Test of the Automatic Flight Dynamics Operations for Geostationary Satellite Mission

    NASA Astrophysics Data System (ADS)

    Park, Sangwook; Lee, Young-Ran; Hwang, Yoola; Javier Santiago Noguero Galilea

    2009-12-01

    This paper describes the Flight Dynamics Automation (FDA) system for COMS Flight Dynamics System (FDS) and its test result in terms of the performance of the automation jobs. FDA controls the flight dynamics functions such as orbit determination, orbit prediction, event prediction, and fuel accounting. The designed FDA is independent from the specific characteristics which are defined by spacecraft manufacturer or specific satellite missions. Therefore, FDA could easily links its autonomous job control functions to any satellite mission control system with some interface modification. By adding autonomous system along with flight dynamics system, it decreases the operator’s tedious and repeated jobs but increase the usability and reliability of the system. Therefore, FDA is used to improve the completeness of whole mission control system’s quality. The FDA is applied to the real flight dynamics system of a geostationary satellite, COMS and the experimental test is performed. The experimental result shows the stability and reliability of the mission control operations through the automatic job control.

  10. Supervisory control and diagnostics system for the mirror fusion test facility: overview and status 1980

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McGoldrick, P.R.

    1981-01-01

    The Mirror Fusion Test Facility (MFTF) is a complex facility requiring a highly-computerized Supervisory Control and Diagnostics System (SCDS) to monitor and provide control over ten subsystems; three of which require true process control. SCDS will provide physicists with a method of studying machine and plasma behavior by acquiring and processing up to four megabytes of plasma diagnostic information every five minutes. A high degree of availability and throughput is provided by a distributed computer system (nine 32-bit minicomputers on shared memory). Data, distributed across SCDS, is managed by a high-bandwidth Distributed Database Management System. The MFTF operators' control roommore » consoles use color television monitors with touch sensitive screens; this is a totally new approach. The method of handling deviations to normal machine operation and how the operator should be notified and assisted in the resolution of problems has been studied and a system designed.« less

  11. Prototype Interoperability Document between NASA-JSC and DLR-GSOC Describing the CCSDS SM and C Mission Operations Prototype

    NASA Technical Reports Server (NTRS)

    Lucord, Steve A.; Gully, Sylvain

    2009-01-01

    The purpose of the PROTOTYPE INTEROPERABILITY DOCUMENT is to document the design and interfaces for the service providers and consumers of a Mission Operations prototype between JSC-OTF and DLR-GSOC. The primary goal is to test the interoperability sections of the CCSDS Spacecraft Monitor & Control (SM&C) Mission Operations (MO) specifications between both control centers. An additional goal is to provide feedback to the Spacecraft Monitor and Control (SM&C) working group through the Review Item Disposition (RID) process. This Prototype is considered a proof of concept and should increase the knowledge base of the CCSDS SM&C Mission Operations standards. No operational capabilities will be provided. The CCSDS Mission Operations (MO) initiative was previously called Spacecraft Monitor and Control (SM&C). The specifications have been renamed to better reflect the scope and overall objectives. The working group retains the name Spacecraft Monitor and Control working group and is under the Mission Operations and Information Services Area (MOIMS) of CCSDS. This document will refer to the specifications as SM&C Mission Operations, Mission Operations or just MO.

  12. 49 CFR 236.1039 - Operations and Maintenance Manual.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Operations and Maintenance Manual. 236.1039... Train Control Systems § 236.1039 Operations and Maintenance Manual. (a) The railroad shall catalog and..., modification, inspection, and testing of the PTC system and have them in one Operations and Maintenance Manual...

  13. 14 CFR 125.287 - Initial and recurrent pilot testing requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... TRANSPORTATION (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS... air navigation aids appropriate to the operation of pilot authorization, including, when applicable, instrument approach facilities and procedures; (5) Air traffic control procedures, including IFR procedures...

  14. Acoustical Testing Laboratory Developed to Support the Low-Noise Design of Microgravity Space Flight Hardware

    NASA Technical Reports Server (NTRS)

    Cooper, Beth A.

    2001-01-01

    The NASA John H. Glenn Research Center at Lewis Field has designed and constructed an Acoustical Testing Laboratory to support the low-noise design of microgravity space flight hardware. This new laboratory will provide acoustic emissions testing and noise control services for a variety of customers, particularly for microgravity space flight hardware that must meet International Space Station limits on noise emissions. These limits have been imposed by the space station to support hearing conservation, speech communication, and safety goals as well as to prevent noise-induced vibrations that could impact microgravity research data. The Acoustical Testing Laboratory consists of a 23 by 27 by 20 ft (height) convertible hemi/anechoic chamber and separate sound-attenuating test support enclosure. Absorptive 34-in. fiberglass wedges in the test chamber provide an anechoic environment down to 100 Hz. A spring-isolated floor system affords vibration isolation above 3 Hz. These criteria, along with very low design background levels, will enable the acquisition of accurate and repeatable acoustical measurements on test articles, up to a full space station rack in size, that produce very little noise. Removable floor wedges will allow the test chamber to operate in either a hemi/anechoic or anechoic configuration, depending on the size of the test article and the specific test being conducted. The test support enclosure functions as a control room during normal operations but, alternatively, may be used as a noise-control enclosure for test articles that require the operation of noise-generating test support equipment.

  15. Percent CO2. Operational Control Tests for Wastewater Treatment Facilities. Instructor's Manual [and] Student Workbook.

    ERIC Educational Resources Information Center

    Wooley, John F.

    Designed for individuals who have completed National Pollutant Discharge Elimination System (NPDES) level 1 laboratory training skills, this module on digestor gas analysis provides waste water treatment plant operators with the basic skills and information needed to: (1) successfully run the carbon dioxide analysis test; (2) accurately record…

  16. 40 CFR 63.5722 - How do I use the performance test data to demonstrate initial compliance?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 12 2011-07-01 2009-07-01 true How do I use the performance test data... Manufacturing Demonstrating Compliance for Open Molding Operations Controlled by Add-on Control Devices § 63.5722 How do I use the performance test data to demonstrate initial compliance? Demonstrate initial...

  17. 40 CFR 63.5722 - How do I use the performance test data to demonstrate initial compliance?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true How do I use the performance test data... Manufacturing Demonstrating Compliance for Open Molding Operations Controlled by Add-on Control Devices § 63.5722 How do I use the performance test data to demonstrate initial compliance? Demonstrate initial...

  18. Implementing Sympson-Hetter Item-Exposure Control in a Shadow-Test Approach to Constrained Adaptive Testing

    ERIC Educational Resources Information Center

    Veldkamp, Bernard P.; van der Linden, Wim J.

    2008-01-01

    In most operational computerized adaptive testing (CAT) programs, the Sympson-Hetter (SH) method is used to control the exposure of the items. Several modifications and improvements of the original method have been proposed. The Stocking and Lewis (1998) version of the method uses a multinomial experiment to select items. For severely constrained…

  19. 40 CFR 63.5722 - How do I use the performance test data to demonstrate initial compliance?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 13 2014-07-01 2014-07-01 false How do I use the performance test data... Boat Manufacturing Demonstrating Compliance for Open Molding Operations Controlled by Add-on Control Devices § 63.5722 How do I use the performance test data to demonstrate initial compliance? Demonstrate...

  20. 40 CFR 63.5722 - How do I use the performance test data to demonstrate initial compliance?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 13 2013-07-01 2012-07-01 true How do I use the performance test data... Boat Manufacturing Demonstrating Compliance for Open Molding Operations Controlled by Add-on Control Devices § 63.5722 How do I use the performance test data to demonstrate initial compliance? Demonstrate...

  1. 40 CFR 63.5722 - How do I use the performance test data to demonstrate initial compliance?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 13 2012-07-01 2012-07-01 false How do I use the performance test data... Boat Manufacturing Demonstrating Compliance for Open Molding Operations Controlled by Add-on Control Devices § 63.5722 How do I use the performance test data to demonstrate initial compliance? Demonstrate...

  2. Recent Stirling Conversion Technology Developments and Operational Measurements

    NASA Technical Reports Server (NTRS)

    Oriti, Salvatore; Schifer, Nicholas

    2009-01-01

    Under contract to the Department of Energy (DOE), Lockheed Martin Space Systems Company (LMSSC) has been developing the Advanced Stirling Radioisotope Generator (ASRG). The use of Stirling technology introduces a four-fold increase in conversion efficiency over Radioisotope Thermoelectric Generators (RTGs), and thus the ASRG in an attractive power system option for future science missions. In August of 2008, the ASRG engineering unit (EU) was delivered to NASA Glenn Research Center (GRC). The engineering unit design resembles that of a flight unit, with the exception of electrical heating in place of a radioisotope source. Prior to delivery, GRC personnel prepared a test station continuous, unattended operation of the engineering unit. This test station is capable of autonomously monitoring the unit's safe operation and recording. , .. , .... performance data. Generator parameters recorded include temperatures, electrical power output, and thelmal power input. Convertor specific parameters are also recorded such as alternator voltage, current, piston amplitude, and frequency. Since November 2008, the ASRG EU has accumulated over 4,000 hours of operation. Initial operation was conducted using the AC bus control method in lieu of the LMSSC active power factor connecting controller. Operation on the LMSSC controller began in February 2009. This paper discusses the entirety of ASRG EU operation thus far, as well as baseline performance data at GRC and LMSSC, and comparison of performance using each control method.

  3. Unmanned Aerial Vehicle Flight Test Approval Process and Its Implications: A Methodological Approach to Capture and Evaluate Hidden Costs and Value in the Overall Process

    DTIC Science & Technology

    2012-03-22

    world’s first powered and controlled flying machine. Numerous flight designs and tests were done by scientists, engineers, and flight enthusiasts...conceptual flight and preliminary designs before they could control the craft with three-axis control and the correct airfoil design . These pioneers...analysis support. Although wind tunnel testing can provide data to predict and develop control surface designs , few SUAV operators opt to utilize wind

  4. Link monitor and control operator assistant: A prototype demonstrating semiautomated monitor and control

    NASA Technical Reports Server (NTRS)

    Lee, L. F.; Cooper, L. P.

    1993-01-01

    This article describes the approach, results, and lessons learned from an applied research project demonstrating how artificial intelligence (AI) technology can be used to improve Deep Space Network operations. Configuring antenna and associated equipment necessary to support a communications link is a time-consuming process. The time spent configuring the equipment is essentially overhead and results in reduced time for actual mission support operations. The NASA Office of Space Communications (Code O) and the NASA Office of Advanced Concepts and Technology (Code C) jointly funded an applied research project to investigate technologies which can be used to reduce configuration time. This resulted in the development and application of AI-based automated operations technology in a prototype system, the Link Monitor and Control Operator Assistant (LMC OA). The LMC OA was tested over the course of three months in a parallel experimental mode on very long baseline interferometry (VLBI) operations at the Goldstone Deep Space Communications Center. The tests demonstrated a 44 percent reduction in pre-calibration time for a VLBI pass on the 70-m antenna. Currently, this technology is being developed further under Research and Technology Operating Plan (RTOP)-72 to demonstrate the applicability of the technology to operations in the entire Deep Space Network.

  5. Power-gated 32 bit microprocessor with a power controller circuit activated by deep-sleep-mode instruction achieving ultra-low power operation

    NASA Astrophysics Data System (ADS)

    Koike, Hiroki; Ohsawa, Takashi; Miura, Sadahiko; Honjo, Hiroaki; Ikeda, Shoji; Hanyu, Takahiro; Ohno, Hideo; Endoh, Tetsuo

    2015-04-01

    A spintronic-based power-gated micro-processing unit (MPU) is proposed. It includes a power control circuit activated by the newly supported power-off instruction for the deep-sleep mode. These means enable the power-off procedure for the MPU to be executed appropriately. A test chip was designed and fabricated using 90 nm CMOS and an additional 100 nm MTJ process; it was successfully operated. The guideline of the energy reduction effects for this MPU was presented, using the estimation based on the measurement results of the test chip. The result shows that a large operation energy reduction of 1/28 can be achieved when the operation duty is 10%, under the condition of a sufficient number of idle clock cycles.

  6. Idiopathic normal pressure hydrocephalus: the CSF tap-test may predict the clinical response to shunting.

    PubMed

    Sand, T; Bovim, G; Grimse, R; Myhr, G; Helde, G; Cappelen, J

    1994-05-01

    A follow-up study was performed in nine patients with idiopathic normal pressure hydrocephalus (NPH) 37 months (mean) after shunting and 10 non-operated controls with comparable degrees of ventricular enlargement, gait disorder, and dementia. Five operated patients vs. no controls reported sustained general improvement (p < 0.02). Objectively improved gait at follow-up (compared with preoperative status) was found in five of the six tested NPH-patients vs. none of the controls (p < 0.005). Improved gait and/or psychometric function was found in four of six NPH vs. none of eight control patients (p < 0.02) after drainage of 40 ml cerebrospinal fluid (CSF tap-test). Improved gait during the CSF tap-test predicted continued improvement at follow-up. Temporal horn size was the only radiological variable which showed a (moderate) positive correlation with resistance to CSF absorption and rate of pressure increase. The size of the third ventricle diminished in parallel with clinical improvement.

  7. 11. Historic view of Building 100 control room, showing personnel ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Historic view of Building 100 control room, showing personnel operating rocket engine test controls and observer watching activity from observation room. May 27, 1957. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-45020. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  8. Air STAR Beyond Visual Range UAS Description and Preliminary Test Results

    NASA Technical Reports Server (NTRS)

    Cunningham, Kevin; Cox, David E.; Foster, John V.; Riddick, Stephen E.; Laughter, Sean A.

    2016-01-01

    The NASA Airborne Subscale Transport Aircraft Research Unmanned Aerial System project's capabilities were expanded by updating the system design and concept of operations. The new remotely piloted airplane system design was flight tested to assess integrity and operational readiness of the design to perform flight research. The purpose of the system design is to improve aviation safety by providing a capability to validate, in high-risk conditions, technologies to prevent airplane loss of control. Two principal design requirements were to provide a high degree of reliability and that the new design provide a significant increase in test volume (relative to operations using the previous design). The motivation for increased test volume is to improve test efficiency and allow new test capabilities that were not possible with the previous design and concept of operations. Three successful test flights were conducted from runway 4-22 at NASA Goddard Space Flight Center's Wallops Flight Facility.

  9. Development of Ada language control software for the NASA power management and distribution test bed

    NASA Technical Reports Server (NTRS)

    Wright, Ted; Mackin, Michael; Gantose, Dave

    1989-01-01

    The Ada language software developed to control the NASA Lewis Research Center's Power Management and Distribution testbed is described. The testbed is a reduced-scale prototype of the electric power system to be used on space station Freedom. It is designed to develop and test hardware and software for a 20-kHz power distribution system. The distributed, multiprocessor, testbed control system has an easy-to-use operator interface with an understandable English-text format. A simple interface for algorithm writers that uses the same commands as the operator interface is provided, encouraging interactive exploration of the system.

  10. Analytical control test plan and microbiological methods for the water recovery test

    NASA Technical Reports Server (NTRS)

    Traweek, M. S. (Editor); Tatara, J. D. (Editor)

    1994-01-01

    Qualitative and quantitative laboratory results are important to the decision-making process. In some cases, they may represent the only basis for deciding between two or more given options or processes. Therefore, it is essential that handling of laboratory samples and analytical operations employed are performed at a deliberate level of conscientious effort. Reporting erroneous results can lead to faulty interpretations and result in misinformed decisions. This document provides analytical control specifications which will govern future test procedures related to all Water Recovery Test (WRT) Phase 3 activities to be conducted at the National Aeronautics and Space Administration/Marshall Space Flight Center (NASA/MSFC). This document addresses the process which will be used to verify analytical data generated throughout the test period, and to identify responsibilities of key personnel and participating laboratories, the chains of communication to be followed, and ensure that approved methodology and procedures are used during WRT activities. This document does not outline specifics, but provides a minimum guideline by which sampling protocols, analysis methodologies, test site operations, and laboratory operations should be developed.

  11. Advanced patient transfer assist device with intuitive interaction control.

    PubMed

    Humphreys, Heather C; Choi, Young Mi; Book, Wayne J

    2017-10-24

    This research aims to improve patient transfers by developing a new type of advanced robotic assist device. It has multiple actuated degrees of freedom and a powered steerable base to maximize maneuverability around obstacles. An intuitive interface and control strategy allows the caregiver to simply push on the machine in the direction of desired patient motion. The control integrates measurements of both force and proximity to mitigate any potential large collision forces and provides operators information about obstacles with a form of haptic feedback. Electro-hydraulic pump controlled actuation provides high force density for the actuation. Nineteen participants performed tests to compare transfer operations (transferring a 250-lb mannequin between a wheelchair, chair, bed, and floor) and interaction control of a prototype device with a commercially available patient lift. The testing included a time study of the transfer operations and subjective rating of device performance. The results show that operators perform transfer tasks significantly faster and rate performance higher using the prototype patient transfer assist device than with a current market patient lift. With further development, features of the new patient lift can help facilitate patient transfers that are safer, easier, and more efficient for caregivers.

  12. The improvement of postural control in patients with mechanical ankle instability after lateral ankle ligaments reconstruction.

    PubMed

    Li, Hong-Yun; Zheng, Jie-Jiao; Zhang, Jian; Cai, Ye-Hua; Hua, Ying-Hui; Chen, Shi-Yi

    2016-04-01

    Lateral ankle sprain is the most common injury. A previous study demonstrated that patients with mechanical ankle instability suffered deficits in postural control, indicating that structural damage of the lateral ankle ligaments may produce a balance deficit. The purpose of this study was to confirm that lateral ligaments reconstruction could improve postural control in patients with mechanical ankle instability. A total of 15 patients were included in the study. Each patient had a history of an ankle sprain with persistent symptoms of ankle instability and a positive anterior drawer test and had been treated nonoperatively for at least 3 months. All patients were diagnosed with lateral ankle ligaments tear by ultrasonography and magnetic resonance imaging. They underwent arthroscopic debridement and open lateral ankle ligaments reconstruction with a modified Broström procedure. One day before and 6 months after the operation, all of the participants underwent single-limb postural sway tests. The anterior drawer test and the American Orthopedic Foot and Ankle Society scale score were used to evaluate the clinical results in these patients. At 6 months after the operation, with the patients' eyes closed, there was significantly decreased postural sway in the anteroposterior direction, the circumferential area, and the total path length on the operated ankles compared with those measurements before the operation. With eyes open, however, no difference was found in postural sway before and after the operation. Postural control was improved by reconstructing the lateral ligaments. IV.

  13. Operational Experience from LCLS-II Cryomodule Testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Renzhuo; Hansen, Benjamin; White, Michael

    This paper describes the initial operational experience gained from testing Linac Coherent Light Source II (LCLS-II) cryomodules at Fermilab’s Cryomodule Test Facility (CMTF). Strategies for a controlled slow cooldown to 100 K and a fast cooldown past the niobium superconducting transition temperature of 9.2 K will be described. The test stand for the cryomodules at CMTF is sloped to match gradient in the LCLS-II tunnel at Stanford Linear Accelerator (SLAC) laboratory, which adds an additional challenge to stable liquid level control. Control valve regulation, Superconducting Radio-Frequency (SRF) power compensation, and other methods of stabilizing liquid level and pressure in themore » cryomodule 2.0 K SRF cavity circuit will be discussed. Several different pumping configurations using cold compressors and warm vacuum pumps have been used on the cryomodule 2.0 K return line and the associated results will be described.« less

  14. Impact of total hip arthroplasty on pain, walking ability, and cardiovascular fitness.

    PubMed

    Horstmann, Thomas; Vornholt-Koch, Sandra; Brauner, Torsten; Grau, Stefan; Mündermann, Annegret

    2012-12-01

    We tested the hypothesis that total hip arthroplasty (THA) patients have less pain and are able to walk longer post-operatively than pre-operatively, and that THA patients before and after have higher heart rates and compromised gas exchange determinants at rest and following exercise compared to healthy subjects with a post-operative improvement. Fifty-two patients completed questionnaires and an incremental walking stress test pre-operatively and 6-months after THA. Twenty-four age-matched control subjects completed the same stress test. Fifty-one patients had less pain 6-months after THA compared to pre-operative levels. Forty-three patients showed an improvement of at least one walking duration category. Patients had compromised cardiovascular fitness compared to the control group with a tendency to improve after THA. Hence, 6-months following THA, deficits exist other than reduced strength as reported in the literature. Prior to THA, the ability to walk longer is compromised by pain and not by poor cardiovascular fitness. Studies on specific rehabilitation programs of varying intensities may demonstrate opportunities to improve the cardiovascular fitness of this population. Copyright © 2012 Orthopaedic Research Society.

  15. 10 CFR 431.242 - Test Procedures [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... upstream of the draft control device of an individual, automatically operated, fossil fuel-fired appliance... intended for installation in the venting system of an individual, automatically operated, fossil fuel-fired...

  16. 10 CFR 431.242 - Test Procedures [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... upstream of the draft control device of an individual, automatically operated, fossil fuel-fired appliance... intended for installation in the venting system of an individual, automatically operated, fossil fuel-fired...

  17. 30 CFR 250.1614 - Mud program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Sulphur Operations § 250.1614... shall comply with requirements concerning mud control, mud test and monitoring equipment, mud quantities...

  18. 14 CFR 120.215 - Covered employees.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM... duties. (8) Air traffic control duties. (b) Each employer must identify any employee who is subject to...

  19. 14 CFR 120.215 - Covered employees.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS DRUG AND ALCOHOL TESTING PROGRAM... duties. (8) Air traffic control duties. (b) Each employer must identify any employee who is subject to...

  20. [Antibacterial prevention of suppurative complications after operations on the large intestine].

    PubMed

    Kuzin, M I; Pomelov, V S; Vandiaev, G K; Ialgashev, T Ia; Blatun, L A

    1983-05-01

    The data on comparative study of complications after operations on the large intestine are presented. During the preoperative period, 62 patients of the control group were treated with phthalylsulfathiazole, nevigramon and nystatin. Thirty-nine patients of the test group were treated with metronidazole and kanamycin monosulfate. Kanamycin monosulfate was used 3 days before the operation in a dose of 0.5 g orally 4 times a day whereas metronidazole in a dose of 0.5 g 3 times a day. The last doses of the drugs were administered 4-5 hours before the operation. After the operations the patients were treated with kanamycin sulfate for 3-5 days in a daily dose of 2 g intramuscularly. The number of the postoperative suppurative complications decreased from 22 to 5 per cent. No lethal outcomes were registered in the test group. The number of lethal outcomes in the control group amounted to 8 per cent.

  1. Further Testing of an Amine-based Pressure-Swing System for Carbon Dioxide and Humidity Control

    NASA Technical Reports Server (NTRS)

    Lin, Amy; Smith, Frederick; Sweterlitsch, Jeffrey; Nalette, Tim A.; Papale, William

    2008-01-01

    In a crewed spacecraft environment, atmospheric carbon dioxide (CO2) and moisture control are crucial. Hamilton Sundstrand has developed a stable and efficient amine-based CO2 and water vapor sorbent, SA9T, that is well suited for use in a spacecraft environment. The sorbent is efficiently packaged in pressure-swing regenerable beds that are thermally linked to improve removal efficiency and minimize vehicle thermal loads. Flows are all controlled with a single spool valve. This technology has been baselined for the new Orion spacecraft. However, more data was needed on the operational characteristics of the package in a simulated spacecraft environment. A unit was therefore tested with simulated metabolic loads in a closed chamber at Johnson Space Center during the last third of 2006. Those test results were reported in a 2007 ICES paper. A second test article was incorporated for a third phase of testing, and that test article was modified to allow pressurized gas purge regeneration on the launch pad in addition to the standard vacuum regeneration in space. Metabolic rates and chamber volumes were also adjusted to reflect current programmatic standards. The third phase of tests was performed during the spring and summer of 2007. Tests were run with a range of operating conditions, varying: cycle time, vacuum pressure (or purge gas flow rate), air flow rate, and crew activity levels. Results of this testing are presented and potential flight operational strategies discussed.

  2. Apollo experience report: Guidance and control systems. Lunar module stabilization and control system

    NASA Technical Reports Server (NTRS)

    Shelton, D. H.

    1975-01-01

    A brief functional description of the Apollo lunar module stabilization and control subsystem is presented. Subsystem requirements definition, design, development, test results, and flight experiences are discussed. Detailed discussions are presented of problems encountered and the resulting corrective actions taken during the course of assembly-level testing, integrated vehicle checkout and test, and mission operations. Although the main experiences described are problem oriented, the subsystem has performed satisfactorily in flight.

  3. ATLAS LTCS Vertically Challenged System Lessons Learned

    NASA Technical Reports Server (NTRS)

    Patel, Deepak; Garrison, Matt; Ku, Jentung

    2014-01-01

    Re-planning of LTCS TVAC testing and supporting RTA (Receiver Telescope Assembly) Test Plan and Procedure document preparation. The Laser Thermal Control System (LTCS) is designed to maintain the lasers onboard Advanced Topographic Laser Altimeter System (ATLAS) at their operational temperatures. In order to verify the functionality of the LTCS, a thermal balance test of the thermal hardware was performed. During the first cold start of the LTCS, the Loop Heat Pipe (LHP) was unable to control the laser mass simulators temperature. The control heaters were fully on and the loop temperature remained well below the desired setpoint. Thermal analysis of the loop did not show these results. This unpredicted behavior of the LTCS was brought up to a panel of LHP experts. Based on the testing and a review of all the data, there were multiple diagnostic performed in order to narrow down the cause. The prevailing theory is that gravity is causing oscillating flow within the loop, which artificially increased the control power needs. This resulted in a replan of the LTCS test flow and the addition of a GSE heater to allow vertical operation.

  4. The use of test structures for reliability prediction and process control of integrated circuits and photovoltaics

    NASA Astrophysics Data System (ADS)

    Trachtenberg, I.

    How a reliability model might be developed with new data from accelerated stress testing, failure mechanisms, process control monitoring, and test structure evaluations is illustrated. The effects of the acceleration of temperature on operating life is discussed. Test structures that will further accelerate the failure rate are discussed. Corrosion testing is addressed. The uncoated structure is encapsulated in a variety of mold compounds and subjected to pressure-cooker testing.

  5. Design criteria monograph for actuators and operators

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Instrumentation for actuators and operators includes electrical position-indicating switches, potentiometers, and transducers and pressure-indicating switches and transducers. Monograph is based on critical evaluation of experiences and practices in design, test, and use of these control devices and instruments in operational space vehicles.

  6. Definition study for an extended manned test of a regenerative life support system

    NASA Technical Reports Server (NTRS)

    1971-01-01

    A program was defined which consists of extended ground-based manned tests of regenerative life support systems. The tests are to evaluate prototypes of advanced life support systems under operational, integrated conditions, thus providing data for the design of efficient environmental control and life support systems for use in long-duration space missions. The requirements are defined for test operations to provide a simulation of an orbiting space laboratory. The features of Phase A and B programs are described. These tests use proven backup equipment to ensure successful evaluation of the advanced subsystems. A pre-tests all-systems checkout period is provided to minimize equipment problems during extended testing and to familiarize all crew and operating staff members with test equipment and procedures.

  7. Knowledge acquisition and representation for the Systems Test and Operations Language (STOL) Intelligent Tutoring System (ITS)

    NASA Technical Reports Server (NTRS)

    Seamster, Thomas L.; Eike, David R.; Ames, Troy J.

    1990-01-01

    This presentation concentrates on knowledge acquisition and its application to the development of an expert module and a user interface for an Intelligent Tutoring System (ITS). The Systems Test and Operations Language (STOL) ITS is being developed to assist NASA control center personnel in learning a command and control language as it is used in mission operations rooms. The objective of the tutor is to impart knowledge and skills that will permit the trainee to solve command and control problems in the same way that the STOL expert solves those problems. The STOL ITS will achieve this object by representing the solution space in such a way that the trainee can visualize the intermediate steps, and by having the expert module production rules parallel the STOL expert's knowledge structures.

  8. The BepiColombo/SERENA package: Serena Integrated Test campaign

    NASA Astrophysics Data System (ADS)

    Orsini, S.; De Angelis, E.; Livi, S.; Lichtenegger, H.; Barabash, S.; Milillo, A.; Wurz, P.; Olivieir, A.; D'Arcio, L.; Philips, M.; Laky, G.; Wieser, M.; Camozzi, F.; Di Lellis, A. M.; Rispoli, R.; Jeszenesky, H.; Mura, A.; Aronica, A.; Lazzarotto, F.; Vertolli, N.

    2017-09-01

    The activities related to the BepiColombo/ MPO/SERENA Integrated Test (SIT, held in February-March 2017 inside the thermal vacuum facility at the University of Bern, Phys. Inst.) are presented. This campaign has been a unique opportunity to test the experiment performances, with all the four flight-spare instruments of SERENA (ELENA, STROFIO, PICAM, and MIPA, simultaneously operated by the System Control Unit (SCU), in a fully operational configuration.

  9. Flight Test Evaluation of the ATD-1 Interval Management Application

    NASA Technical Reports Server (NTRS)

    Swieringa, Kurt A.; Wilson, Sara R.; Baxley, Brian T.; Roper, Roy D.; Abbott, Terence S.; Levitt, Ian; Scharl, Julien

    2017-01-01

    Interval Management (IM) is a concept designed to be used by air traffic controllers and flight crews to more efficiently and precisely manage inter-aircraft spacing. Both government and industry have been working together to develop the IM concept and standards for both ground automation and supporting avionics. NASA contracted with Boeing, Honeywell, and United Airlines to build and flight test an avionics prototype based on NASA's spacing algorithm and conduct a flight test. The flight test investigated four different types of IM operations over the course of nineteen days, and included en route, arrival, and final approach phases of flight. This paper examines the spacing accuracy achieved during the flight test and the rate of speed commands provided to the flight crew. Many of the time-based IM operations met or exceeded the operational design goals set out in the standards for the maintain operations and a subset of the achieve operations. Those operations which did not meet the goals were due to issues that are identified and will be further analyzed.

  10. Intelligent systems approach for automated identification of individual control behavior of a human operator

    NASA Astrophysics Data System (ADS)

    Zaychik, Kirill B.

    Acceptable results have been obtained using conventional techniques to model the generic human operator's control behavior. However, little research has been done in an attempt to identify an individual based on his/her control behavior. The main hypothesis investigated in this dissertation is that different operators exhibit different control behavior when performing a given control task. Furthermore, inter-person differences are manifested in the amplitude and frequency content of the non-linear component of the control behavior. Two enhancements to the existing models of the human operator, which allow personalization of the modeled control behavior, are presented in this dissertation. One of the proposed enhancements accounts for the "testing" control signals, which are introduced by an operator for more accurate control of the system and/or to adjust his/her control strategy. Such enhancement uses the Artificial Neural Network (ANN), which can be fine-tuned to model the "testing" control behavior of a given individual. The other model enhancement took the form of an equiripple filter (EF), which conditions the power spectrum of the control signal before it is passed through the plant dynamics block. The filter design technique uses Parks-McClellan algorithm, which allows parameterization of the desired levels of power at certain frequencies. A novel automated parameter identification technique (APID) was developed to facilitate the identification process of the parameters of the selected models of the human operator. APID utilizes a Genetic Algorithm (GA) based optimization engine called the Bit-climbing Algorithm (BCA). Proposed model enhancements were validated using the experimental data obtained at three different sources: the Manual Control Laboratory software experiments, Unmanned Aerial Vehicle simulation, and NASA Langley Research Center Visual Motion Simulator studies. Validation analysis involves comparison of the actual and simulated control activity signals. Validation criteria used in this dissertation is based on comparing Power Spectral Densities of the control signals against that of the Precision model of the human operator. This dissertation also addresses the issue of applying the proposed human operator model augmentation to evaluate the effectiveness of the motion feedback when simulating the actual pilot control behavior in a flight simulator. The proposed modeling methodology allows for quantitative assessments and prediction of the need for platform motion, while performing aircraft/pilot simulation studies.

  11. Using cyber vulnerability testing techniques to expose undocumented security vulnerabilities in DCS and SCADA equipment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pollet, J.

    2006-07-01

    This session starts by providing an overview of typical DCS (Distributed Control Systems) and SCADA (Supervisory Control and Data Acquisition) architectures, and exposes cyber security vulnerabilities that vendors never admit, but are found through a comprehensive cyber testing process. A complete assessment process involves testing all of the layers and components of a SCADA or DCS environment, from the perimeter firewall all the way down to the end devices controlling the process, including what to look for when conducting a vulnerability assessment of real-time control systems. The following systems are discussed: 1. Perimeter (isolation from corporate IT or other non-criticalmore » networks) 2. Remote Access (third Party access into SCADA or DCS networks) 3. Network Architecture (switch, router, firewalls, access controls, network design) 4. Network Traffic Analysis (what is running on the network) 5. Host Operating Systems Hardening 6. Applications (how they communicate with other applications and end devices) 7. End Device Testing (PLCs, RTUs, DCS Controllers, Smart Transmitters) a. System Discovery b. Functional Discovery c. Attack Methodology i. DoS Tests (at what point does the device fail) ii. Malformed Packet Tests (packets that can cause equipment failure) iii. Session Hijacking (do anything that the operator can do) iv. Packet Injection (code and inject your own SCADA commands) v. Protocol Exploitation (Protocol Reverse Engineering / Fuzzing) This paper will provide information compiled from over five years of conducting cyber security testing on control systems hardware, software, and systems. (authors)« less

  12. Design and Testing of a Controller for the Martian Atmosphere Pressure and Humidity Instrument DREAMS-P/H

    NASA Astrophysics Data System (ADS)

    Tapani Nikkanen, Timo; Schmidt, Walter; Genzer, Maria; Harri, Ari-Matti; Haukka, Harri

    2013-04-01

    The European Space Agency (ESA), driven by the goal of performing a soft landing on Mars, is planning to launch the Entry, descent and landing Demonstrator Module (EDM)[1] simultaneously with the Trace Gas Orbiter (TGO) as a part of the ExoMars program towards Mars in 2016. As a secondary objective, the EDM will gather meteorological data and observe the electrical environment of the landing site with its Dust characterisation, Risk assessment, and Environmental Analyser on the Martian Surface (DREAMS). The Finnish Meteorological Institute (FMI) is participating in the project by designing, building and testing a pressure and a humidity instrument for Mars, named DREAMS-P and DREAMS-H, respectively. The instruments are based on previous FMI designs, including ones flown on board the Huygens, Phoenix and Mars Science Laboratory.[2] Traditionally, the FMI pressure and humidity instruments have been controlled by an FPGA. However, the need to incorporate more autonomy and modifiability into instruments, cut the development time and component costs, stimulated interest to study a Commercial Off-The-Shelf (COTS) Microcontroller Unit (MCU) based instrument design. Thus, in the DREAMS-P/H design, an automotive MCU is used as the instrument controller. The MCU has been qualified for space by tests in and outside FMI. The DREAMS-P/H controller command and data interface utilizes a RS-422 connection to receive telecommands from and to transmit data to the Central Electronics Unit (CEU) of the DREAMS science package. The two pressure transducers of DREAMS-P and one humidity transducer of DREAMS-H are controlled by a single MCU. The MCU controls the power flow for each transducer and performs pulse counting measurements on sensor and reference channels to retrieve scientific data. Pressure and humidity measurements are scheduled and set up according to a configuration table assigned to each transducer. The configuration tables can be modified during the flight. The whole software is entirely interrupt driven, thus the MCU goes into a power saving standby mode whenever possible. Any measurement or other operation can be stopped by simply interrupting the controller with a telecommand. Software and functional tests of the DREAMS-P/H controller are needed to verify the performance of the instrument in nominal conditions and the correct operation and error detection in anomalous conditions. The nominal conditions tests range from simple functional and performance tests, to longer simulations of continued operation and measurements. Continued operation simulations can be implemented by executing accelerated runs of the expected normal measurement cycles. On the contrary, anomalous conditions tests are used to verify that the controller can handle bad telecommands or anomalous operation of the instrument transducers, for example in the case of malfunctioning sensors. Bad telecommand tests are done by feeding illegal parameters or scrambled telecommands to the controller. Malfunctioning sensors can be simulated by modifying the signals coming from the sensors and reference channels. All expected use cases and all imagined unexpected operating circumstances are studied to ensure that the system is robust. This also makes the planned modification of the design for other future missions easier and safer. Reference: [1] ESA ExoMars EDM mission: http://exploration.esa.int/science-e/www/object/index.cfm?fobjectid=47852 [2] FMI Space Projects website: http://space.fmi.fi/index.php?id=23

  13. Microbial load monitor

    NASA Technical Reports Server (NTRS)

    Caplin, R. S.; Royer, E. R.

    1978-01-01

    Attempts are made to provide a total design of a Microbial Load Monitor (MLM) system flight engineering model. Activities include assembly and testing of Sample Receiving and Card Loading Devices (SRCLDs), operator related software, and testing of biological samples in the MLM. Progress was made in assembling SRCLDs with minimal leaks and which operate reliably in the Sample Loading System. Seven operator commands are used to control various aspects of the MLM such as calibrating and reading the incubating reading head, setting the clock and reading time, and status of Card. Testing of the instrument, both in hardware and biologically, was performed. Hardware testing concentrated on SRCLDs. Biological testing covered 66 clinical and seeded samples. Tentative thresholds were set and media performance listed.

  14. SP-100 initial startup and restart control strategy

    NASA Astrophysics Data System (ADS)

    Halfen, Frank J.; Wong, Kwok K.; Switick, Dennis M.; Shukla, Jaikaran N.

    Startup control strategies for SP-100 are described. Revised control and operating strategies are discussed which have been developed and tested using the SP-100 dynamic simulation model Aries-GFS (Generic Flight System).

  15. Accelerometer-controlled automatic braking system

    NASA Technical Reports Server (NTRS)

    Dreher, R. C.; Sleeper, R. K.; Nayadley, J. R., Sr.

    1973-01-01

    Braking system, which employs angular accelerometer to control wheel braking and results in low level of tire slip, has been developed and tested. Tests indicate that system is feasible for operations on surfaces of different slipperinesses. System restricts tire slip and is capable of adapting to rapidly-changing surface conditions.

  16. Loop Heat Pipe Operation Using Heat Source Temperature for Set Point Control

    NASA Technical Reports Server (NTRS)

    Ku, Jentung; Paiva, Kleber; Mantelli, Marcia

    2011-01-01

    Loop heat pipes (LHPs) have been used for thermal control of several NASA and commercial orbiting spacecraft. The LHP operating temperature is governed by the saturation temperature of its compensation chamber (CC). Most LHPs use the CC temperature for feedback control of its operating temperature. There exists a thermal resistance between the heat source to be cooled by the LHP and the LHP's CC. Even if the CC set point temperature is controlled precisely, the heat source temperature will still vary with its heat output. For most applications, controlling the heat source temperature is of most interest. A logical question to ask is: "Can the heat source temperature be used for feedback control of the LHP operation?" A test program has been implemented to answer the above question. Objective is to investigate the LHP performance using the CC temperature and the heat source temperature for feedback control

  17. Test and training simulator for ground-based teleoperated in-orbit servicing

    NASA Technical Reports Server (NTRS)

    Schaefer, Bernd E.

    1989-01-01

    For the Post-IOC(In-Orbit Construction)-Phase of COLUMBUS it is intended to use robotic devices for the routine operations of ground-based teleoperated In-Orbit Servicing. A hardware simulator for verification of the relevant in-orbit operations technologies, the Servicing Test Facility, is necessary which mainly will support the Flight Control Center for the Manned Space-Laboratories for operational specific tasks like system simulation, training of teleoperators, parallel operation simultaneously to actual in-orbit activities and for the verification of the ground operations segment for telerobotics. The present status of definition for the facility functional and operational concept is described.

  18. Neutron Particle Effects on a Quad-Redundant Flight Control Computer

    NASA Technical Reports Server (NTRS)

    Eure, Kenneth; Belcastro, Celeste M.; Gray, W Steven; Gonzalex, Oscar

    2003-01-01

    This paper describes a single-event upset experiment performed at the Los Alamos National Laboratory. A closed-loop control system consisting of a Quad-Redundant Flight Control Computer (FCC) and a B737 simulator was operated while the FCC was exposed to a neutron beam. The purpose of this test was to analyze the effects of neutron bombardment on avionics control systems operating at altitudes where neutron strikes are probable. The neutron energy spectrum produced at the Los Alamos National Laboratory is similar in shape to the spectrum of atmospheric neutrons but much more intense. The higher intensity results in accelerated life tests that are representative of the actual neutron radiation that a FCC may receive over a period of years.

  19. Foam property tests to evaluate the potential for longwall shield dust control.

    PubMed

    Reed, W R; Beck, T W; Zheng, Y; Klima, S; Driscoll, J

    2018-01-01

    Tests were conducted to determine properties of four foam agents for their potential use in longwall mining dust control. Foam has been tried in underground mining in the past for dust control and is currently being reconsidered for use in underground coal longwall operations in order to help those operations comply with the Mine Safety and Health Administration's lower coal mine respirable dust standard of 1.5 mg/m 3 . Foams were generated using two different methods. One method used compressed air and water pressure to generate foam, while the other method used low-pressure air generated by a blower and water pressure using a foam generator developed by the U.S. National Institute for Occupational Safety and Health. Foam property tests, consisting of a foam expansion ratio test and a water drainage test, were conducted to classify foams. Compressed-air-generated foams tended to have low expansion ratios, from 10 to 19, with high water drainage. Blower-air-generated foams had higher foam expansion ratios, from 30 to 60, with lower water drainage. Foams produced within these ranges of expansion ratios are stable and potentially suitable for dust control. The test results eliminated two foam agents for future testing because they had poor expansion ratios. The remaining two foam agents seem to have properties adequate for dust control. These material property tests can be used to classify foams for their potential use in longwall mining dust control.

  20. Foam property tests to evaluate the potential for longwall shield dust control

    PubMed Central

    Reed, W.R.; Beck, T.W.; Zheng, Y.; Klima, S.; Driscoll, J.

    2018-01-01

    Tests were conducted to determine properties of four foam agents for their potential use in longwall mining dust control. Foam has been tried in underground mining in the past for dust control and is currently being reconsidered for use in underground coal longwall operations in order to help those operations comply with the Mine Safety and Health Administration’s lower coal mine respirable dust standard of 1.5 mg/m3. Foams were generated using two different methods. One method used compressed air and water pressure to generate foam, while the other method used low-pressure air generated by a blower and water pressure using a foam generator developed by the U.S. National Institute for Occupational Safety and Health. Foam property tests, consisting of a foam expansion ratio test and a water drainage test, were conducted to classify foams. Compressed-air-generated foams tended to have low expansion ratios, from 10 to 19, with high water drainage. Blower-air-generated foams had higher foam expansion ratios, from 30 to 60, with lower water drainage. Foams produced within these ranges of expansion ratios are stable and potentially suitable for dust control. The test results eliminated two foam agents for future testing because they had poor expansion ratios. The remaining two foam agents seem to have properties adequate for dust control. These material property tests can be used to classify foams for their potential use in longwall mining dust control. PMID:29416179

  1. Apollo Soyuz Test Project Weights and Mass Properties Operational Management System

    NASA Technical Reports Server (NTRS)

    Collins, M. A., Jr.; Hischke, E. R.

    1975-01-01

    The Apollo Soyuz Test Project (ASTP) Weights and Mass Properties Operational Management System was established to assure a timely and authoritative method of acquiring, controlling, generating, and disseminating an official set of vehicle weights and mass properties data. This paper provides an overview of the system and its interaction with the various aspects of vehicle and component design, mission planning, hardware and software simulations and verification, and real-time mission support activities. The effect of vehicle configuration, design maturity, and consumables updates is discussed in the context of weight control.

  2. Validating a UAV artificial intelligence control system using an autonomous test case generator

    NASA Astrophysics Data System (ADS)

    Straub, Jeremy; Huber, Justin

    2013-05-01

    The validation of safety-critical applications, such as autonomous UAV operations in an environment which may include human actors, is an ill posed problem. To confidence in the autonomous control technology, numerous scenarios must be considered. This paper expands upon previous work, related to autonomous testing of robotic control algorithms in a two dimensional plane, to evaluate the suitability of similar techniques for validating artificial intelligence control in three dimensions, where a minimum level of airspeed must be maintained. The results of human-conducted testing are compared to this automated testing, in terms of error detection, speed and testing cost.

  3. EMI/EMP Resistant Data Bus

    DTIC Science & Technology

    1976-09-01

    Control Multiplex Terminal Unit (CMTU) 1 each MTU Test Set 2 each CMTU Test Set 1 each 9 port Radial Coupler 1 each Fiber Optics Radial...Introduction 3 2 . MTU 11 3. CMTU 1 ? 4. SSIU and Controller ?! 5. Optical Data Bus 21 II System Design Construction 24 1 . Optoelectronic...8217 TABLE OF CONTENTS (Continued) SECTION TITLE PAGE IV System Test and Operation 1 . Test Equipment 2 . Evaluation a. Optical Bus b. Optoelectronic

  4. The evaluation of a number of prototypes for the free-tip rotor constant-moment controller

    NASA Technical Reports Server (NTRS)

    Young, L. A.

    1986-01-01

    The development of several prototypes of a constant moment controller, a critical component of the free-tip rotor (FTR) concept, is described. Also presented are the experimental results of a whirl test designed to select a final controller configuration to be included in a future wind-tunnel test of this innovative rotor system. A brief explanation of the FTR concept and its history are included. The paper documents the controller design constraints, each prototype's operating principle, the evaluation test, and the individual prototype test results. A recommended design is identified, along with the selection rationale.

  5. Integrated Ground Operations Demonstration Units Testing Plans and Status

    NASA Technical Reports Server (NTRS)

    Johnson, Robert G.; Notardonato, William U.; Currin, Kelly M.; Orozco-Smith, Evelyn M.

    2012-01-01

    Cryogenic propellant loading operations with their associated flight and ground systems are some of the most complex, critical activities in launch operations. Consequently, these systems and operations account for a sizeable portion of the life cycle costs of any launch program. NASA operations for handling cryogens in ground support equipment have not changed substantially in 50 years, despite advances in cryogenics, system health management and command and control technologies. This project was developed to mature, integrate and demonstrate advancement in the current state of the art in these areas using two distinct integrated ground operations demonstration units (GODU): GODU Integrated Refrigeration and Storage (IRAS) and GODU Autonomous Control

  6. Florida specific NTCIP MIB development for actuated signal controller (ASC), closed-circuit television (CCTV), and center-to-center (C2C) communications with SunGuideSM software and ITS device test procedure development : summary of final report.

    DOT National Transportation Integrated Search

    2009-06-01

    To provide hardware, software, network, systems research, and testing for multi-million dollar traffic : operations, Intelligent Transportation Systems (ITS), and statewide communications investments, the : Traffic Engineering and Operations Office h...

  7. Florida specific NTCIP MIB development for actuated signal controller (ASC), closed-circuit television (CCTV), and center-to-center (C2C) communications with SunGuideSM software and ITS device test procedure development : executive summary.

    DOT National Transportation Integrated Search

    2009-06-01

    To provide hardware, software, network, systems research, and testing for multi-million : dollar traffic operations, Intelligent Transportation Systems (ITS), and statewide : communications investments, the Traffic Engineering and Operations Office h...

  8. Filter Leaf. Operational Control Tests for Wastewater Treatment Facilities. Instructor's Manual [and] Student Workbook.

    ERIC Educational Resources Information Center

    Wooley, John F.

    In the operation of vacuum filters and belt filters, it is desirable to evaluate the performance of different types of filter media and conditioning processes. The filter leaf test, which is used to evaluate these items, is described. Designed for individuals who have completed National Pollutant Discharge Elimination System (NPDES) level 1…

  9. Benchmarking and Hardware-In-The-Loop Operation of a 2014 MAZDA SkyActiv (SAE 2016-01-1007)

    EPA Science Inventory

    Engine Performance evaluation in support of LD MTE. EPA used elements of its ALPHA model to apply hardware-in-the-loop (HIL) controls to the SKYACTIV engine test setup to better understand how the engine would operate in a chassis test after combined with future leading edge tech...

  10. Results of prototype software development for automation of shuttle proximity operations

    NASA Technical Reports Server (NTRS)

    Hiers, Hal; Olszweski, Oscar

    1991-01-01

    The effort involves demonstration of expert system technology application to Shuttle rendezvous operations in a high-fidelity, real-time simulation environment. The JSC Systems Engineering Simulator (SES) served as the test bed for the demonstration. Rendezvous applications were focused on crew procedures and monitoring of sensor health and trajectory status. Proximity operations applications were focused on monitoring, crew advisory, and control of the approach trajectory. Guidance, Navigation, and Control areas of emphasis included the approach, transition and stationkeeping guidance, and laser docking sensor navigation. Operator interface displays for monitor and control functions were developed. A rule-based expert system was developed to manage the relative navigation system/sensors for nominal operations and simple failure contingencies. Testing resulted in the following findings; (1) the developed guidance is applicable for operations with LVLH stabilized targets; (2) closing rates less than 0.05 feet per second are difficult to maintain due to the Shuttle translational/rotational cross-coupling; (3) automated operations result in reduced propellant consumption and plume impingement effects on the target as compared to manual operations; and (4) braking gates are beneficial for trajectory management. A versatile guidance design was demonstrated. An accurate proximity operations sensor/navigation system to provide relative attitude information within 30 feet is required and redesign of the existing Shuttle digital autopilot should be considered to reduce the cross-coupling effects. This activity has demonstrated the feasibility of automated Shuttle proximity operations with the Space Station Freedom. Indications are that berthing operations as well as docking can be supported.

  11. Design and operating experience on the US Department of Energy experimental Mod-0 100-kW wind turbine

    NASA Technical Reports Server (NTRS)

    Glasgow, J. C.; Birchenough, A. G.

    1978-01-01

    The experimental wind turbine was designed and fabricated to assess technology requirements and engineering problems of large wind turbines. The machine has demonstrated successful operation in all of its design modes and served as a prototype developmental test bed for the Mod-0A operational wind turbines which are currently used on utility networks. The mechanical and control system are described as they evolved in operational tests and some of the experience with various systems in the downwind rotor configurations are elaborated.

  12. Double-quality control reveals high-level toxicity in gloves used for operator protection in assisted reproductive technology.

    PubMed

    Lierman, Sylvie; De Sutter, Petra; Dhont, Marc; Van der Elst, Josiane

    2007-10-01

    To submit different glove brands to double-quality control tests using mouse embryo assay (MEA) and the human sperm motility assay (HuSMA). Operator protection against infectious body fluid contamination is a safety issue in assisted reproductive technology (ART). When using gloves in the ART laboratory, toxic substances can be transmitted to culture media, even during brief contact. Quality control study of gloves in ART. University hospital-based infertility center. Seven- to 8-week-old female B6D2F1 hybrid mice. We tested two surgical, two cleanroom, and six examination glove brands. Only gloves brands that passed both HuSMA and MEA were submitted to further QC using zona-free and/or cryopreserved MEA. Sperm motility index, two-cell and blastocyst development, blastocyst total cell number. Quality control by MEA and HuSMA identified two glove brands to be nontoxic. Our study shows that gloves used in ART can be toxic and should be tested as part of an ongoing quality control program.

  13. A unique concept for automatically controlling the braking action of wheeled vehicles during minimum distance stops

    NASA Technical Reports Server (NTRS)

    Barthlome, D. E.

    1975-01-01

    Test results of a unique automatic brake control system are outlined and a comparison is made of its mode of operation to that of an existing skid control system. The purpose of the test system is to provide automatic control of braking action such that hydraulic brake pressure is maintained at a near constant, optimum value during minimum distance stops.

  14. Robot-operated quality control station based on the UTT method

    NASA Astrophysics Data System (ADS)

    Burghardt, Andrzej; Kurc, Krzysztof; Szybicki, Dariusz; Muszyńska, Magdalena; Nawrocki, Jacek

    2017-03-01

    This paper presents a robotic test stand for the ultrasonic transmission tomography (UTT) inspection of stator vane thickness. The article presents the method of the test stand design in Autodesk Robot Structural Analysis Professional 2013 software suite. The performance of the designed test stand solution was simulated in the RobotStudio software suite. The operating principle of the test stand measurement system is presented with a specific focus on the measurement strategy. The results of actual wall thickness measurements performed on stator vanes are presented.

  15. UTM Technical Capabilities Level 2 (TLC2) Test at Reno-Stead Airport.

    NASA Image and Video Library

    2016-10-06

    Test of Unmanned Aircraft Systems Traffic Management (UTM) technical capability Level 2 (TCL2) at Reno-Stead Airport, Nevada. During the test, five drones simultaneously crossed paths, separated by altitude. Two drones flew beyond visual line-of-sight and three flew within line-of-sight of their operators. Engineers Priya Venkatesan and Joey Mercer review flight paths using the UAS traffic management research platform at flight operations mission control at NASA’s UTM TCL2 test.

  16. Shock Position Control for Mode Transition in a Turbine Based Combined Cycle Engine Inlet Model

    NASA Technical Reports Server (NTRS)

    Csank, Jeffrey T.; Stueber, Thomas J.

    2013-01-01

    A dual flow-path inlet for a turbine based combined cycle (TBCC) propulsion system is to be tested in order to evaluate methodologies for performing a controlled inlet mode transition. Prior to experimental testing, simulation models are used to test, debug, and validate potential control algorithms which are designed to maintain shock position during inlet disturbances. One simulation package being used for testing is the High Mach Transient Engine Cycle Code simulation, known as HiTECC. This paper discusses the development of a mode transition schedule for the HiTECC simulation that is analogous to the development of inlet performance maps. Inlet performance maps, derived through experimental means, describe the performance and operability of the inlet as the splitter closes, switching power production from the turbine engine to the Dual Mode Scram Jet. With knowledge of the operability and performance tradeoffs, a closed loop system can be designed to optimize the performance of the inlet. This paper demonstrates the design of the closed loop control system and benefit with the implementation of a Proportional-Integral controller, an H-Infinity based controller, and a disturbance observer based controller; all of which avoid inlet unstart during a mode transition with a simulated disturbance that would lead to inlet unstart without closed loop control.

  17. Reactor transient control in support of PFR/TREAT TUCOP experiments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burrows, D.R.; Larsen, G.R.; Harrison, L.J.

    1984-01-01

    Unique energy deposition and experiment control requirements posed bythe PFR/TREAT series of transient undercooling/overpower (TUCOP) experiments resulted in equally unique TREAT reactor operations. New reactor control computer algorithms were written and used with the TREAT reactor control computer system to perform such functions as early power burst generation (based on test train flow conditions), burst generation produced by a step insertion of reactivity following a controlled power ramp, and shutdown (SCRAM) initiators based on both test train conditions and energy deposition. Specialized hardware was constructed to simulate test train inputs to the control computer system so that computer algorithms couldmore » be tested in real time without irradiating the experiment.« less

  18. Evaluation of the New B-REX Fatigue Testing System for Multi-Megawatt Wind Turbine Blades: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    White, D.; Musial, W.; Engberg, S.

    2004-12-01

    The National Renewable Energy Laboratory (NREL) recently developed a new hybrid fatigue testing system called the Blade Resonance Excitation (B-REX) test system. The new system uses 65% less energy to test large wind turbine blades in half the time of NREL's dual-axis forced-displacement test method with lower equipment and operating costs. The B-REX is a dual-axis test system that combines resonance excitation with forced hydraulic loading to reduce the total test time required while representing the operating strains on the critical inboard blade stations more accurately than a single-axis test system. The analysis and testing required to fully implement themore » B-REX was significant. To control unanticipated blade motion and vibrations caused by dynamic coupling between the flap, lead-lag, and torsional directions, we needed to incorporate additional test hardware and control software. We evaluated the B-REX test system under stable operating conditions using a combination of various sensors. We then compared our results with results from the same blade, tested previously using NREL's dual-axis forced-displacement test method. Experimental results indicate that strain levels produced by the B-REX system accurately replicated the forced-displacement method. This paper describes the challenges we encountered while developing the new blade fatigue test system and the experimental results that validate its accuracy.« less

  19. Generation and characterization of diesel exhaust in a facility for controlled human exposures

    EPA Science Inventory

    An idling medium-duty diesel truck operated on ultralow sulfur diesel fuel was used as an emission source to generate diesel exhaust for controlled human exposure. Repeat tests were conducted on the Federal Test Procedure using a chassis dynamometer to demonstrate the reproducibi...

  20. 40 CFR 89.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... secondarily for operation in water. Auxiliary emission control device (AECD) means any element of design that... design which controls or reduces the emission of substances from an engine. Engine, as used in this part... testing, to translation of designs from the test stage to the production stage, or to engine manufacture...

Top