Sample records for operational test final

  1. Hazardous material transportation safety and security field operational test final detailed test plans : executive summary

    DOT National Transportation Integrated Search

    2003-09-16

    The objective of this Hazardous Material (HazMat) Transportation Safety and Security Field Operational Test (FOT) Final Detailed Test Plans evaluation is to measure the impact of technology solutions on the safety, security, and operational efficienc...

  2. Computer-aided dispatch--traffic management center field operational test final detailed test plan : WSDOT deployment

    DOT National Transportation Integrated Search

    2003-10-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment". This document defines the objective, approach,...

  3. Computer-aided dispatch--traffic management center field operational test final test plans : state of Utah

    DOT National Transportation Integrated Search

    2004-01-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : state of Utah". This document defines the objective, approach, an...

  4. Genesis field operational test : final evaluation report

    DOT National Transportation Integrated Search

    1997-09-01

    This document is the Final Evaluation Report for the Genesis Advanced Traveler Information System (ATIS) Field Operational Test (FOT). Genesis was one of the early projects sponsored by the US Department of Transportation (USDOT) Intelligent Transpor...

  5. FleetForward evaluation : final report

    DOT National Transportation Integrated Search

    2000-10-01

    This document is the final report for the evaluation of the I-95 Corridor Coalitions FleetForward operational test. The objective of this test was to evaluate the usefulness of traffic flow data to motor carrier operations. Cambridge Systematics, in ...

  6. Computer-aided dispatch--traffic management center field operational test : Washington State final report

    DOT National Transportation Integrated Search

    2006-05-01

    This document provides the final report for the evaluation of the USDOT-sponsored Computer-Aided Dispatch - Traffic Management Center Integration Field Operations Test in the State of Washington. The document discusses evaluation findings in the foll...

  7. Computer-aided dispatch--traffic management center field operational test : state of Utah final report

    DOT National Transportation Integrated Search

    2006-07-01

    This document provides the final report for the evaluation of the USDOT-sponsored Computer-Aided Dispatch Traffic Management Center Integration Field Operations Test in the State of Utah. The document discusses evaluation findings in the followin...

  8. Hazardous material transportation safety and security field operational test final evaluation plan : executive summary

    DOT National Transportation Integrated Search

    2003-03-17

    The purpose of this effort is to independently evaluate the Battelle Operational Test Team to test methods for leveraging technology and operations to improve HAZMAT transport security, safety, and operational efficiency. As such, the preceding techn...

  9. Houston Smart Commuter

    DOT National Transportation Integrated Search

    2002-04-01

    This final report documents the background, history, operations and findings of the Houston Smart Commuter operational test. This operational test was designed to evaluate the potential for achieving more efficient use of travel alternatives through ...

  10. Process development for automated solar cell and module production. Task 4: Automated array assembly

    NASA Technical Reports Server (NTRS)

    Hagerty, J. J.

    1981-01-01

    The Unimate robot was programmed for the final 35 cell pattern to be used in the fabrication of the deliverable modules. Mechanical construction of the Automated Lamination Station and Final Assembly Station were completed on schedule. All final wiring and interconnect cables were also completed and the first operational testing began. The final controlling program was written. A local fabricator was contracted to produce the glass reinforced concrete panels to be used for testing and deliverables. A video tape showing all three stations in operation was produced.

  11. 77 FR 50855 - Oil and Gas and Sulphur Operations on the Outer Continental Shelf-Increased Safety Measures for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-22

    ... according to the design. The third- subsea function and pressure tests party verification must include...; Requires new casing and cementing integrity tests; Establishes new requirements for subsea secondary BOP... that, for the final casing string (or liner if it is the final string), an operator must install one...

  12. Herald : field operational test evaluation final report

    DOT National Transportation Integrated Search

    2000-09-01

    The Herald Field Operational Test (FOT) tested AM radio as a low-cost way to broadcast traveler information in rural areas. It tested the feasibility of broadcasting data on the inaudible portion of an existing AM broadcast. Two systems were tested, ...

  13. Herald Field Operation Test Evaluation : Final Report

    DOT National Transportation Integrated Search

    2000-09-01

    The Herald Field Operational Test (FOT) tested AM radio as a low-cost way to broadcast traveler information in rural areas. It tested the feasibility of broadcasting data on the inaudible portion of an existing AM broadcast. Two systems were tested, ...

  14. Test Operations Procedure (TOP) 03-2-827 Test Procedures for Video Target Scoring Using Calibration Lights

    DTIC Science & Technology

    2016-04-04

    Final 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Test Operations Procedure (TOP) 03-2-827 Test Procedures for Video Target Scoring Using...ABSTRACT This Test Operations Procedure (TOP) describes typical equipment and procedures to setup and operate a Video Target Scoring System (VTSS) to...lights. 15. SUBJECT TERMS Video Target Scoring System, VTSS, witness screens, camera, target screen, light pole 16. SECURITY

  15. Astronaut John Young during final suiting operations for Apollo 10 mission

    NASA Technical Reports Server (NTRS)

    1969-01-01

    A technician attaches hose from test stand to spacesuit of Astronaut John W. Young, Apollo 10 command module pilot, during final suiting operations for the Apollo 10 lunar orbit mission. Another technician makes adjustment behind Young.

  16. Evaluation of TravInfo field operational test

    DOT National Transportation Integrated Search

    2000-04-25

    This document constitutes the final report of the evaluation of the TravInfo field operational test. TravInfo is a regional traveler information system in operation in the San Francisco Bay Area. The focus of the evaluation was on three areas: instit...

  17. Operational test results of the passive final approach spacing tool

    DOT National Transportation Integrated Search

    1997-06-01

    A prototype decision support tool for terminal area air traffic controllers, : referred to as the Final Approach Spacing Tool (FAST), was recently evaluated in : operation with live air traffic at the Dallas/Fort Worth, Texas Airport, : Controllers u...

  18. Intermodal Freight Technology Working Group asset tracking and "freight information highway" field operational test evaluation : final report executive summary

    DOT National Transportation Integrated Search

    2003-09-01

    In January 2001, the Federal Highway Administration (FHWA) released a solicitation requesting "Cost Sharing Cooperative Agreements" to conduct operational tests to improve efficiencies in the intermodal freight operations and to establish the foundat...

  19. Travlink Operational Test Evaluation Report; Final Report

    DOT National Transportation Integrated Search

    1996-08-01

    ">THE OBJECTIVES OF THE TRAVLINK OPERATIONAL TEST WERE TO IMPROVE TRANSIT FLEET MANAGEMENT, IMPROVE THE TIMELINESS AND ACCURACY OF TRAVEL INFORMATION, AND ENCOURAGE TRANSIT RIDERSHIP. THE PROJECT'S CORRIDOR WAS A NEWLY RECONSTRUCTED FREEWAY THAT WAS ...

  20. Evaluation of the PuSHMe regional mayday system operational test : final report

    DOT National Transportation Integrated Search

    1997-09-01

    This report is an independent evaluation of the Puget Sound Emergency Response Operational Test (PuSHMe), a test of regional mayday systems that allow a driver to signal his or her location and need for assistance to a response center.

  1. SMART operational field test evaluation : operations database report : final report

    DOT National Transportation Integrated Search

    1997-09-01

    Based on the Suburban Mobility Authority For Regional Transportations (SMART) weekly operating reports from its Macomb, Wayne, Troy, and Pontiac terminals, this Operations Database Report explores productivity measures over time, and examines how ...

  2. Southwest Electronic One-Stop Shopping (EOSS) : field operational test : final evaluation report

    DOT National Transportation Integrated Search

    1999-06-01

    This report presents an evaluation of the Southwest Electronic One-Stop Shopping System (EOSS) Operational Test. The system consisted of a PC-based software application that enabled interstate carriers to identify required commercial vehicle credenti...

  3. Port-of-entry Advanced Sorting System (PASS) operational test : final report

    DOT National Transportation Integrated Search

    1998-12-01

    In 1992 the Oregon Department of Transportation undertook an operational test of the Port-of-Entry Advanced Sorting System (PASS), which uses a two-way communication automatic vehicle identification system, integrated with weigh-in-motion, automatic ...

  4. SMART operational field test evaluation : dispatchers survey report : final report

    DOT National Transportation Integrated Search

    1997-06-01

    The Suburban Mobility Authority for Regional Transportation (SMART) has installed an automaticscheduling and dispatch system (ASD) in Southeast Michigan in accordance with their plans toimplement ITS as a site for an operational field test. The purpo...

  5. Challenges and Opportunities for an ITS Intermodal Freight Program

    DOT National Transportation Integrated Search

    1999-02-01

    This final report was developed as part of the project, "ITS/Intermodal Freight Design for Operational Tests." The objective of the project was to develop a plan for conducting field operational tests to facilitate movement of intermodal freight in t...

  6. Challenges And Opportunities For An ITS/Intermodal Freight Program

    DOT National Transportation Integrated Search

    1999-02-01

    This final report was developed as part of the project, "ITS/Intermodal Freight Design for Operational Tests". The objective of the project was to develop a plan for conducting field operational tests to facilitate movement of intermodal freight in t...

  7. SMART operational field test evaluation : scheduler survey report : final report

    DOT National Transportation Integrated Search

    1997-06-01

    The Suburban Mobility Authority for Regional Transportation (SMART) has installed an automatic scheduling and dispatch system (ASD) in Southeast Michigan in accordance with their plans to implement ITS as a site for an operational field test. The pur...

  8. Strategic plan for the FleetForward evaluation : technical memorandum

    DOT National Transportation Integrated Search

    1999-04-01

    This document is the final report for the evaluation of the I-95 Corridor Coalitions FleetForward operational test. The objective of this test was to evaluate the usefulness of traffic flow data to motor carrier operations. Cambridge Systematics, in ...

  9. Pretest information for a test to validate plume simulation procedures (FA-17)

    NASA Technical Reports Server (NTRS)

    Hair, L. M.

    1978-01-01

    The results of an effort to plan a final verification wind tunnel test to validate the recommended correlation parameters and application techniques were presented. The test planning effort was complete except for test site finalization and the associated coordination. Two suitable test sites were identified. Desired test conditions were shown. Subsequent sections of this report present the selected model and test site, instrumentation of this model, planned test operations, and some concluding remarks.

  10. Evaluation of the Mack Intelligent Vehicle Field Operational Test: September 2006

    DOT National Transportation Integrated Search

    2006-09-01

    This report presents the final results of an independent evaluation of the U.S. Department of Transportation (USDOT) Mack Intelligent Vehicle Initiative (IVI) Field Operational Test (FOT). The IVI is a cooperative effort to conduct FOTs of advanced i...

  11. Integrated vehicle-based safety systems field operational test final program report.

    DOT National Transportation Integrated Search

    2011-06-01

    "This document presents results from the light-vehicle and heavy-truck field operational tests performed as part of the Integrated Vehicle-Based Safety Systems (IVBSS) program. The findings are the result of analyses performed by the University of Mi...

  12. Integrated Vehicle-Based Safety Systems Field Operational Test : Final Program Report

    DOT National Transportation Integrated Search

    2011-06-01

    This document presents results from the light-vehicle and heavy-truck field operational tests performed as part of the Integrated Vehicle-Based Safety Systems (IVBSS) program. The findings are the result of analyses performed by the University of Mic...

  13. WSDOT intermodal data linkages : freight ITS operational test evaluation final report. Part 1, electronic container seals evaluation

    DOT National Transportation Integrated Search

    2002-12-01

    In mid-1999, in response to the U.S. Department of Transportation's (USDOT) request for participation in the Intelligent Transportation Systems (ITS) Intermodal Freight Field Operational Test (FOT) Program, the Washington State Department of Transpor...

  14. Final report : mobile surveillance and wireless communication systems field operational test. Volume 2, FOT objectives, organization, system design, results, conclusions, and recommendations

    DOT National Transportation Integrated Search

    1999-03-01

    The Mobile Surveillance and Wireless Communication Systems Field Operational Test (FOT) evaluated the performance of wireless traffic detection and communications systems in areas where permanent detectors, electrical power, and landline communicatio...

  15. WSDOT intermodal data linkages : freight ITS operational test evaluation final report. Part 2, freight ITS traffic data evaluation

    DOT National Transportation Integrated Search

    2003-01-01

    In mid-1999, in response to the U.S. Department of Transportation's request for participation in the Intelligent Transportation Systems (ITS) Intermodal Freight Field Operational Test (FOT) Program, the Washington State Department of Transportation (...

  16. Process development for automated solar cell and module production. Task 4: Automated array assembly

    NASA Technical Reports Server (NTRS)

    Hagerty, J. J.

    1981-01-01

    Progress in the development of automated solar cell and module production is reported. The unimate robot is programmed for the final 35 cell pattern to be used in the fabrication of the deliverable modules. The mechanical construction of the automated lamination station and final assembly station phases are completed and the first operational testing is underway. The final controlling program is written and optimized. The glass reinforced concrete (GRC) panels to be used for testing and deliverables are in production. Test routines are grouped together and defined to produce the final control program.

  17. Final technical report for ITS for voluntary emission reduction : an ITS operational test using real-time vehicle emissions detection

    DOT National Transportation Integrated Search

    1998-05-01

    The Smart Sign project has successfully demonstrated the merging of two separate technological disciplines of highway messaging and on-road vehicle emissions sensing into an advanced ITS public information system. This operational test has demonstrat...

  18. ORANGES evaluation final report appendices : for the US DOT sponsored evaluation of the ORANGES electronic payment systems field operational test

    DOT National Transportation Integrated Search

    2004-12-06

    These are the appendices for the report describing the findings of the US DOT-sponsored evaluation of the Orlando (Florida) ORANGES multi-modal Field Operational Test (FOT); the report includes: a background description of the ORANGES FOT; the Evalua...

  19. ORANGES evaluation final report : for the US DOT sponsored evaluation of the ORANGES electronic payment systems field operational test

    DOT National Transportation Integrated Search

    2004-12-06

    This report describes the findings of the US DOT-sponsored evaluation of the Orlando (Florida) ORANGES multi-modal Field Operational Test (FOT); the report includes: a background description of the ORANGES FOT; the Evaluation Strategy and Plan, which...

  20. Transfer-appropriate processing in the testing effect.

    PubMed

    Veltre, Mary T; Cho, Kit W; Neely, James H

    2015-01-01

    The testing effect is the finding that taking a review test enhances performance on a final test relative to restudying the material. The present experiment investigated transfer-appropriate processing in the testing effect using semantic and orthographic cues to evoke conceptual and data-driven processing, respectively. After a study phase, subjects either restudied the material or took a cued-recall test consisting of half semantic and half orthographic cues in which the correct response was given as feedback. A final, cued-recall test consisted of the identical cue, or a new cue that was of the same type or different type of cue (semantic/orthographic or orthographic/semantic) as that used for that target in the review test. Testing enhanced memory in all conditions. When the review cues and final-test cues were identical, final recall was higher for semantic than orthographic cues. Consistent with test-based transfer-appropriate processing, memory performance improved as the review and final cues became more similar. These results suggest that the testing effect could potentially be caused by the episodic retrieval processes in a final memory test overlapping more with the episodic retrieval processes in a review test than with the encoding operations performed during restudy.

  1. 75 FR 19665 - Final Regulatory Guide: Issuance, Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-15

    ... processes, including welding, heat treating, and nondestructive testing, are controlled and accomplished by... that when stressed under operating, maintenance, testing, and postulated accident conditions (1) the...

  2. Petition to request an exemption from 100 percent identity testing of dietary ingredients: Current Good Manufacturing Practice in Manufacturing, Packaging, Labeling, or Holding Operations for Dietary Supplements. Interim final rule.

    PubMed

    2007-06-25

    The Food and Drug Administration (FDA) is issuing an interim final rule (IFR) that sets forth a procedure for requesting an exemption from the requirement in the final rule "Current Good Manufacturing Practice in Manufacturing, Packaging, Labeling, or Holding Operations for Dietary Supplements," published elsewhere in this issue of the Federal Register, that the manufacturer conduct at least one appropriate test or examination to verify the identity of any component that is a dietary ingredient. This IFR allows for submission to, and review by, FDA of an alternative to the required 100 percent identity testing of components that are dietary ingredients, provided certain conditions are met and establishes a requirement for retention of records relating to the FDA's response to an exemption request.

  3. Draft version 1.0 final report : evaluation methods and lessons learned from the Minnesota Department of Transportation intelligent vehicle initiative field operational test

    DOT National Transportation Integrated Search

    2003-09-26

    This report on the Evaluation Methods and Lessons Learned for the Mn/DOT Intelligent Vehicle Initiative (IVI) Field Operational Test (FOT) documents the goals and objectives, research approach, methods, and findings of a program to measure the feasib...

  4. Sand and Dust Testing of Wheeled and Tracked Vehicles and Stationary Equipment

    DTIC Science & Technology

    2009-11-18

    early stages of development of an automotive system or stationary equipment there may be components and sub-systems that need to be tested for...suitability to operate in dust before final prototypes are available for end item or system-level testing. At this stage of development, component or...Method 510, or TOP 1-2-621 does not include functional operation during active testing. Additionally, testing by using either of these two documents is

  5. Requirement for a standard language for test and ground operations

    NASA Technical Reports Server (NTRS)

    Medlock, J. R.

    1971-01-01

    The basic requirements for a standard test and checkout language applicable to all phases of the space shuttle test and ground operations are determined. The general characteristics outlined here represent the integration of selected ideas and concepts from operational elements within Kennedy Space Center (KSC) that represent diverse disciplines associated with space vehicle testing and launching operations. Special reference is made to two studies conducted in this area for KSC as authorized by the Advanced Development Element of the Office of Manned Space Flight (MSF). Information contained in reports from these studies have contributed significantly to the final selection of language features depicted in this technical report.

  6. SUPERFUND TREATABILITY CLEARINGHOUSE: FINAL ...

    EPA Pesticide Factsheets

    During the period of July 8 - July 12, 1985, the Shirco Infrared Systems Portable Pilot Test Unit was in operation at the Times Beach Dioxin Research Facility to demonstrate the capability of Shirco's infrared technology to decontaminate silty soil laden with 2,3,7,8-tetrachlorodibenzo-p-dioxin (TCDD) at a concentration range of 156 to 306 ppb. Emissions sampling and final analysis was performed by Environmental Research & Technology, Inc. (ERT), while laboratory analysis of the emissions and soil samples was performed by Roy F. Weston Inc. Shirco Infrared Systems prepared the testing procedure protocol and operated the furnace system. publish information

  7. Director, Operational Test and Evaluation FY 2015 Annual Report

    DTIC Science & Technology

    2016-01-01

    review. For example, where a wind turbine project was found to have the potential to seriously degrade radar cross section testing at the Naval Air...Assessment Plan U.S. Special Operations Command Tempest Wind 2015 Assessment Plan U.S. Transportation Command Turbo Challenge 2015 Final Assessment...U.S. Air Forces Central Command 2015 May 2015 U.S. Special Operations Command-Pacific Tempest Wind 2014 May 2015 North American Aerospace Defense

  8. Shuttle payload S-band communications system

    NASA Technical Reports Server (NTRS)

    Batson, B. H.; Teasdale, W. E.; Pawlowski, J. F.; Schmidt, O. L.

    1985-01-01

    The Shuttle payload S-band communications system design, operational capabilities, and performance are described in detail. System design requirements, overall system and configuration and operation, and laboratory/flight test results are presented. Payload communications requirements development is discussed in terms of evolvement of requirements as well as the resulting technical challenges encountered in meeting the initial requirements. Initial design approaches are described along with cost-saving initiatives that subsequently had to be made. The resulting system implementation that was finally adopted is presented along with a functional description of the system operation. A description of system test results, problems encountered, how the problems were solved, and the system flight experience to date is presented. Finally, a summary of the advancements made and the lessons learned is discussed.

  9. Speed Control Law for Precision Terminal Area In-Trail Self Spacing

    NASA Technical Reports Server (NTRS)

    Abbott, Terence S.

    2002-01-01

    This document describes a speed control law for precision in-trail airborne self-spacing during final approach. This control law was designed to provide an operationally viable means to obtain a desired runway threshold crossing time or minimum distance, one aircraft relative to another. The control law compensates for dissimilar final approach speeds between aircraft pairs and provides guidance for a stable final approach. This algorithm has been extensively tested in Monte Carlo simulation and has been evaluated in piloted simulation, with preliminary results indicating acceptability from operational and workload standpoints.

  10. TESTING OF TMR SAND MANTIS FINAL REPORT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krementz, D; William Daugherty, W

    2007-06-12

    Screening tests of Sand Mantis candidate materials selected for erosion resistance have been completed. The results of this testing identified that over a relatively short period of operation (<1 hour), measurable erosion will occur in each of the candidate zoom tube materials given equal operating exposure. Additionally, this testing has shown that erosion of the rubber discharge hose directly downstream of the vehicle could be expected to limit the service life of the discharge hose. On the basis of these test results, SRNL recommends the following; {lg_bullet} redesign of critical system components (e.g., zoom tube, discharge hose) should be conductedmore » to improve system characteristics relative to erosion and capitalize on the results of this testing, {lg_bullet} continued efforts to deploy the Sand Mantis should include testing to better define and optimize operating parameters, and gain an understanding of system dynamics, {lg_bullet} discontinue wear testing with the selected materials pending redesign of critical system components (1st recommendation) and inclusion of other candidate materials. The final selection of additional candidate materials should be made following design changes, but might include a Stellite alloy or zirconia.« less

  11. Florida specific NTCIP MIB development for actuated signal controller (ASC), closed-circuit television (CCTV), and center-to-center (C2C) communications with SunGuideSM software and ITS device test procedure development : summary of final report.

    DOT National Transportation Integrated Search

    2009-06-01

    To provide hardware, software, network, systems research, and testing for multi-million dollar traffic : operations, Intelligent Transportation Systems (ITS), and statewide communications investments, the : Traffic Engineering and Operations Office h...

  12. Status of the transportation technology center - 2015 : final report.

    DOT National Transportation Integrated Search

    2016-03-01

    The Transportation Technology Center (TTC) is a Federally owned, privately operated test facility in Colorado. It has over 50 : miles of test track arranged in different configurations for testing all aspects of vehicle-track interaction. Maximum tes...

  13. High-Precision Coupling Mechanism Operable By Robots

    NASA Technical Reports Server (NTRS)

    Voellmer, George

    1992-01-01

    Coupling mechanism has features making it easily operable by hand and suitable for operation by robots: tolerates some initial misalignment, imposes precise final alignment, and protects itself against overtightening. Typically used to mount equipment module on structure. Mechanism includes kinematic mounts, which tolerate small initial misalignment and enforce precise final alignment as two assemblies brought together. Clamping force applied to kinematic mounts via two flexible plates. Bolt and nut tightened on flexible plates to impose spring clamping load. Repeatability of interface tested and found to be better than forty-millionths of inch.

  14. Convert Ten Foot Environmental Test Chamber into an Ion Engine Test Chamber

    NASA Technical Reports Server (NTRS)

    VanVelzer, Paul

    2006-01-01

    The 10 Foot Space Simulator at the Jet Propulsion Laboratory has been used for the last 40 years to test numerous spacecraft, including the Ranger series, several Mariner class, among many others and finally, the Spirit and Opportunity Mars Rovers. The request was made to convert this facility to an Ion Engine test facility, with a possible long term life test. The Ion engine was to propel the Prometheus spacecraft to Jupiter's moons. This paper discusses the challenges that were met, both from a procedural and physical standpoint. The converted facility must operate unattended, support a 30 Kw Ion Engine, operate economically, and be easily converted back to former operation as a spacecraft test facility.

  15. Rocket Propulsion 21 Steering Committee Meeting (RP21) NASA In-Space Propulsion Update

    NASA Technical Reports Server (NTRS)

    Klem, Mark

    2015-01-01

    In-house Support of NEXT-C Contract Status Thruster NEXT Long Duration Test post-test destructive evaluation in progress Findings will be used to verify service life models identify potential design improvements Cathode heater fabrication initiated for cyclic life testing Thruster operating algorithm definition verification initiated to provide operating procedures for mission users High voltage propellant isolator life test voluntarily terminated after successfully operating 51,200 h Power processor unit (PPU) Replaced all problematic stacked multilayer ceramic dual inline pin capacitors within PPU Test bed Rebuilt installed discharge power supply primary power board Completed full functional performance characterization Final test report in progress Transferred PPU Testbed to contractor to support prototype design effort.

  16. Development and Evaluation of Vocational Competency Measures. Final Report.

    ERIC Educational Resources Information Center

    Chalupsky, Albert B.; And Others

    A series of occupational competency tests representing all seven vocational education curriculum areas were developed, field tested, and validated. Seventeen occupations were selected for competency test development: agricultural chemicals applications technician, farm equipment mechanic, computer operator, word processing specialist, apparel…

  17. United States Air Force F-35A Operational Basing Environmental Impact Statement. Volume 1

    DTIC Science & Technology

    2013-09-01

    Evaluation (FDE) program and Weapons School (WS) beddown, the F-22 designator was used. Subsequent testing , development, and deployment resulted in...Initial F-35A Operational Basing EIS Final, September 2013 contract to develop the JSF ( designated the F-35 Lightning II). Since then, testing of F...of the aircraft even with system failures. Throughout the design and testing process, safety initiatives took previous best practices for single

  18. A Fire Safety Certification System for Board and Care Operators and Staff. SBIR Phase I: Final Report.

    ERIC Educational Resources Information Center

    Walker, Bonnie L.

    This report describes the development and pilot testing of a fire safety certification system for board and care operators and staff who serve clients with developmental disabilities. During Phase 1, training materials were developed, including a trainer's manual, a participant's coursebook a videotape, an audiotape, and a pre-/post test which was…

  19. SMART operational field test evaluation : customer survey report : final report

    DOT National Transportation Integrated Search

    1997-06-01

    The Suburban Mobility Authority for Regional Transportation (SMART), which provides both paratransit and fixed-route service in the Detroit metropolitan area, has engaged in a program to update its paratransit operations--which it calls Community Tra...

  20. Program for the improvement of downhole drilling motor bearings and seals. Phase V. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DeLafosse, P.H.; Tibbitts, G.A.; Black, A.D.

    1983-08-01

    The work done during the fifth and final phase of a program to improve downhole drilling motor bearing and seals is described. The principal activities in this phase were: (a) testing seals with abrasive-laden mud on the low-pressure side; (b) test second and third generation designs of both elastomeric chevron seals and Teflon U-seals; and (c) testing a full-scale bearing/seal package. Several operating parameters which have a radical effect on seal life were identified, and some promising designs and materials were tested.

  1. 10 CFR 50.59 - Changes, tests, and experiments.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Changes, tests, and experiments. 50.59 Section 50.59..., Limitations, and Conditions of Licenses and Construction Permits § 50.59 Changes, tests, and experiments. (a... operator actions and response times). (6) Tests or experiments not described in the final safety analysis...

  2. 10 CFR 50.59 - Changes, tests, and experiments.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Changes, tests, and experiments. 50.59 Section 50.59..., Limitations, and Conditions of Licenses and Construction Permits § 50.59 Changes, tests, and experiments. (a... operator actions and response times). (6) Tests or experiments not described in the final safety analysis...

  3. 10 CFR 50.59 - Changes, tests, and experiments.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Changes, tests, and experiments. 50.59 Section 50.59..., Limitations, and Conditions of Licenses and Construction Permits § 50.59 Changes, tests, and experiments. (a... operator actions and response times). (6) Tests or experiments not described in the final safety analysis...

  4. Portable bench tester for piezo weigh-in-motion equipment : final report, June 2006.

    DOT National Transportation Integrated Search

    2006-06-01

    The Ohio Department of Transportation's (ODOT) piezo weigh-in-motion (WIM) equipment must be tested for initial working operation and to insure continued correct operation. Currently, the only available method to verify the vehicle classification par...

  5. Commercial vehicle operations one-stop electronic purchasing and processing, ITS operational test : final evaluation report

    DOT National Transportation Integrated Search

    1997-09-01

    The United States Department of Transportations (USDOTs) National ITS Program : Plan describes the national strategy for deploying advanced technologies and services into our : transportation system. To emphasize the need-driven (rather than te...

  6. 'Advancement of KHPS to DOE TRL 7/8' Project - Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adonizio, Mary Ann; Corren, Dean; Smith, Ron

    Final Report describing activities performed under the 'Advancement of the KHPS to DOE TRL 7/8' project, including the development of critical component test protocols, testing and analysis of the Gen5 KHPS main shaft seal, and continuing compliance work on approved operational environmental monitoring plans in anticipation of KHPS turbine installation at Verdant Power's Roosevelt Island Tidal Energy (RITE) Project site in New York, NY.

  7. Planned flight test of a mercury ion auxiliary propulsion system. 1: Objectives, systems descriptions, and mission operations

    NASA Technical Reports Server (NTRS)

    Power, J. C.

    1978-01-01

    A planned flight test of an 8 cm diameter, electron-bombardment mercury ion thruster system is described. The primary objective of the test is to flight qualify the 5 mN (1 mlb.) thruster system for auxiliary propulsion applications. A seven year north-south stationkeeping mission was selected as the basis for the flight test operating profile. The flight test, which will employ two thruster systems, will also generate thruster system space performance data, measure thruster-spacecraft interactions, and demonstrate thruster operation in a number of operating modes. The flight test is designated as SAMSO-601 and will be flown aboard the shuttle-launched Air Force space test program P80-1 satellite in 1981. The spacecraft will be 3- axis stabilized in its final 740 km circular orbit, which will have an inclination of approximately greater than 73 degrees. The spacecraft design lifetime is three years.

  8. Development of Infrared Phase Closure Capability in the Infrared-Optical Telescope Array (IOTA)

    NASA Technical Reports Server (NTRS)

    Traub, Wesley A.

    2002-01-01

    We completed all major fabrication and testing for the third telescope and phase-closure operation at the Infrared-Optical Telescope Array (IOTA) during this period. In particular we successfully tested the phase-closure operation, using a laboratory light source illuminating the full delay-line optical paths, and using an integrated-optic beam combiner coupled to our Picnic-detector camera. This demonstration is an important and near-final milestone achievement. As of this writing, however, several tasks yet remain, owing to development snags and weather, so the final proof of success, phase-closure observation of a star, is now expected to occur in early 2002, soon after this report has been submitted.

  9. 40 CFR 160.35 - Quality assurance unit.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... standard operating procedures were made without proper authorization and documentation. (6) Review the final study report to assure that such report accurately describes the methods and standard operating... LABORATORY PRACTICE STANDARDS Organization and Personnel § 160.35 Quality assurance unit. (a) A testing...

  10. 40 CFR 160.35 - Quality assurance unit.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... standard operating procedures were made without proper authorization and documentation. (6) Review the final study report to assure that such report accurately describes the methods and standard operating... LABORATORY PRACTICE STANDARDS Organization and Personnel § 160.35 Quality assurance unit. (a) A testing...

  11. 40 CFR 160.35 - Quality assurance unit.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... standard operating procedures were made without proper authorization and documentation. (6) Review the final study report to assure that such report accurately describes the methods and standard operating... LABORATORY PRACTICE STANDARDS Organization and Personnel § 160.35 Quality assurance unit. (a) A testing...

  12. 40 CFR 160.35 - Quality assurance unit.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... standard operating procedures were made without proper authorization and documentation. (6) Review the final study report to assure that such report accurately describes the methods and standard operating... LABORATORY PRACTICE STANDARDS Organization and Personnel § 160.35 Quality assurance unit. (a) A testing...

  13. 40 CFR 160.35 - Quality assurance unit.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... standard operating procedures were made without proper authorization and documentation. (6) Review the final study report to assure that such report accurately describes the methods and standard operating... LABORATORY PRACTICE STANDARDS Organization and Personnel § 160.35 Quality assurance unit. (a) A testing...

  14. Landsat-7 Simulation and Testing Environments

    NASA Technical Reports Server (NTRS)

    Holmes, E.; Ha, K.; Hawkins, K.; Lombardo, J.; Ram, M.; Sabelhaus, P.; Scott, S.; Phillips, R.

    1999-01-01

    A spacecraft Attitude Control and Determination Subsystem (ACDS) is heavily dependent upon simulation throughout its entire development, implementation and ground test cycle. Engineering simulation tools are typically developed to design and analyze control systems to validate the design and software simulation tools are required to qualify the flight software. However, the need for simulation does not end here. Operating the ACDS of a spacecraft on the ground requires the simulation of spacecraft dynamics, disturbance modeling and celestial body motion. Sensor data must also be simulated and substituted for actual sensor data on the ground so that the spacecraft will respond by sending commands to the actuators as they will on orbit. And finally, the simulators is the primary training tool and test-bed for the Flight Operations Team. In this paper various ACDS simulation, developed for or used by the Landsat 7 project will be described. The paper will include a description of each tool, its unique attributes, and its role in the overall development and testing of the ACDS. Finally, a section is included which discusses how the coordinated use of these simulation tools can maximize the probability of uncovering software, hardware and operations errors during the ground test process.

  15. Demonstration/Validation of the TC-60 Controlled Detonation Chamber, Porton Down, UK: Final Demonstration Test Report

    DTIC Science & Technology

    2007-06-01

    Joint At the exit of the expansion tank, a polymeric composition of ethylene-propylene- diene terpolymer ( EPDM ) rubber was used to mate the flange of...The final connection of the detonator was cumbersome for an operator wearing thick butyl rubber gloves. The detonator wire connection was made to a...operators were required to wear PPE, including rubber gloves. The decision was made to transfer the PLC components to outside the VCS. In Phase I, the

  16. A cyclic ground test of an ion auxiliary propulsion system: Description and operational considerations

    NASA Technical Reports Server (NTRS)

    Ling, Jerri S.; Kramer, Edward H.

    1988-01-01

    The Ion Auxiliary Propulsion System (IAPS) experiment is designed for launch on an Air Force Space Test Program satellite (NASA-TM-78859; AIAA Paper No. 78-647). The primary objective of the experiment is to flight qualify the 8 cm mercury ion thruster system for stationkeeping applications. Secondary objectives are measuring the interactions between operating ion thruster systems and host spacecraft, and confirming the design performance of the thruster systems. Two complete 8 cm mercury ion thruster subsystems will be flown. One of these will be operated for 2557 on and off cycles and 7057 hours at full thrust. Tests are currently under way in support of the IAPS flight experiment. In this test an IAPS thruster is being operated through a series of startup/run/shut-down cycles which simulate thruster operation during the planned flight experiment. A test facility description and operational considerations of this testing using an engineering model 8 cm thruster (S/N 905) is the subject of this paper. Final results will be published at a later date when the ground test has been concluded.

  17. Flight Test Evaluation of the ATD-1 Interval Management Application

    NASA Technical Reports Server (NTRS)

    Swieringa, Kurt A.; Wilson, Sara R.; Baxley, Brian T.; Roper, Roy D.; Abbott, Terence S.; Levitt, Ian; Scharl, Julien

    2017-01-01

    Interval Management (IM) is a concept designed to be used by air traffic controllers and flight crews to more efficiently and precisely manage inter-aircraft spacing. Both government and industry have been working together to develop the IM concept and standards for both ground automation and supporting avionics. NASA contracted with Boeing, Honeywell, and United Airlines to build and flight test an avionics prototype based on NASA's spacing algorithm and conduct a flight test. The flight test investigated four different types of IM operations over the course of nineteen days, and included en route, arrival, and final approach phases of flight. This paper examines the spacing accuracy achieved during the flight test and the rate of speed commands provided to the flight crew. Many of the time-based IM operations met or exceeded the operational design goals set out in the standards for the maintain operations and a subset of the achieve operations. Those operations which did not meet the goals were due to issues that are identified and will be further analyzed.

  18. Stilling basin design and operation for water quality : field testing, final report.

    DOT National Transportation Integrated Search

    2008-06-15

    Many construction projects involve the need to pump turbid water from borrow pits or other excavations into stilling : basins or sediment bags prior to discharge. The design and operation of these basins needs to be optimized to : provide the best wa...

  19. Space Shuttle Orbiter Approach and Landing Test Evaluation Report. Captive-Active Flight Test Summary

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Captive-active tests consisted of three mated carrier aircraft/Orbiter flights with an active manned Orbiter. The objectives of this series of flights were to (1) verify the separation profile, (2) verify the integrated structure, aerodynamics, and flight control system, (3) verify Orbiter integrated system operations, and (4) refine and finalize carrier aircraft, Orbiter crew, and ground procedures in preparation for free flight tests. A summary description of the flights is presented with assessments of flight test requirements, and of the performance operations, and of significant flight anomalies is included.

  20. A 9700-hour durability test of a five centimeter diameter ion thruster

    NASA Technical Reports Server (NTRS)

    Nakanishi, S.; Finke, R. C.

    1973-01-01

    A modified Hughes SIT-5 thruster was life-tested at the Lewis Research Center. The final 2700 hours of the test are described with a charted history of thruster operating parameters and off-normal events. Performance and operating characteristics were nearly constant throughout the test except for neutralizer heater power requirements and accelerator drain current. A post-shutdown inspection revealed sputter erosion of ion chamber components and component flaking of sputtered metal. Several flakes caused beamlet divergence and anomalous grid erosion, causing the test to be terminated. All sputter erosion sources were identified.

  1. Final test results for the ground operations demonstration unit for liquid hydrogen

    NASA Astrophysics Data System (ADS)

    Notardonato, W. U.; Swanger, A. M.; Fesmire, J. E.; Jumper, K. M.; Johnson, W. L.; Tomsik, T. M.

    2017-12-01

    Described herein is a comprehensive project-a large-scale test of an integrated refrigeration and storage system called the Ground Operations and Demonstration Unit for Liquid Hydrogen (GODU LH2), sponsored by the Advanced Exploration Systems Program and constructed at Kennedy Space Center. A commercial cryogenic refrigerator interfaced with a 125,000 l liquid hydrogen tank and auxiliary systems in a manner that enabled control of the propellant state by extracting heat via a closed loop Brayton cycle refrigerator coupled to a novel internal heat exchanger. Three primary objectives were demonstrating zero-loss storage and transfer, gaseous liquefaction, and propellant densification. Testing was performed at three different liquid hydrogen fill-levels. Data were collected on tank pressure, internal tank temperature profiles, mass flow in and out of the system, and refrigeration system performance. All test objectives were successfully achieved during approximately two years of testing. A summary of the final results is presented in this paper.

  2. Trends in Operational Fuel Use

    DTIC Science & Technology

    2016-08-01

    Wikipedia, The Free Encyclopedia. Chow Test. Viewed July 18, 2016 at: https://en.wikipedia.org/wiki/Chow_test 8. CNA Research Memorandum CRM 86-178. Ship...Gren Landry and Gregory Suess. May 2006 10. CNA, CRM D0026186.A2/Final. Vessel Traffic in the Hawaii-Southern California and Atlantic Fleet Testing

  3. Roadway usage patterns : urban case studies - final report

    DOT National Transportation Integrated Search

    1996-01-01

    The Orlando Test Network Study was one of a series of investigations conducted as part of the TravTek operational test of an advanced traveler information and traffic management system (ATIS/ATMS). The TravTek system consisted of the Orlando Traffic ...

  4. Final HAZMAT safety and security field operational test : public sector detailed test plans

    DOT National Transportation Integrated Search

    2004-02-03

    Coordination and information sharing among law enforcement and emergency response agencies at the local, state, and national level is a constant challenge. Often, the inability to effectively gather and distribute information among public agencies is...

  5. Final evaluation report for the CAPITAL-ITS operational test and demonstration program

    DOT National Transportation Integrated Search

    1997-05-01

    The CAPITAL project was undertaken to assess the viability of using cellular-based traffic probes as a wide area vehicular traffic surveillance technique. From the test, cellular technology demonstrated the technical potential to provide vehicle spee...

  6. Measurement of Emissions from Produced Water Ponds: Upstream Oil and Gas Study #1; Final Report

    EPA Science Inventory

    Significant uncertainty exists regarding air pollutant emissions from upstream oil and gas production operations. Oil and gas operations present unique and challenging emission testing issues due to the large variety and quantity of potential emissions sources. This report summ...

  7. CERTS Microgrid Laboratory Test Bed - PIER Final Project Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eto, Joseph H.; Eto, Joseph H.; Lasseter, Robert

    2008-07-25

    The objective of the CERTS Microgrid Laboratory Test Bed project was to enhance the ease of integrating small energy sources into a microgrid. The project accomplished this objective by developing and demonstrating three advanced techniques, collectively referred to as the CERTS Microgrid concept, that significantly reduce the level of custom field engineering needed to operate microgrids consisting of small generating sources. The techniques comprising the CERTS Microgrid concept are: 1) a method for effecting automatic and seamless transitions between grid-connected and islanded modes of operation; 2) an approach to electrical protection within the microgrid that does not depend on highmore » fault currents; and 3) a method for microgrid control that achieves voltage and frequency stability under islanded conditions without requiring high-speed communications. The techniques were demonstrated at a full-scale test bed built near Columbus, Ohio and operated by American Electric Power. The testing fully confirmed earlier research that had been conducted initially through analytical simulations, then through laboratory emulations, and finally through factory acceptance testing of individual microgrid components. The islanding and resychronization method met all Institute of Electrical and Electronics Engineers 1547 and power quality requirements. The electrical protections system was able to distinguish between normal and faulted operation. The controls were found to be robust and under all conditions, including difficult motor starts. The results from these test are expected to lead to additional testing of enhancements to the basic techniques at the test bed to improve the business case for microgrid technologies, as well to field demonstrations involving microgrids that involve one or mroe of the CERTS Microgrid concepts.« less

  8. Browns Ferry-1 single-loop operation tests

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    March-Leuba, J.; Wood, R.T.; Otaduy, P.J.

    1985-09-01

    This report documents the results of the stability tests performed on February 9, 1985, at the Browns Ferry Nuclear Power Plant Unit 1 under single-loop operating conditions. The observed increase in neutron noise during single-loop operation is solely due to an increase in flow noise. The Browns Ferry-1 reactor has been found to be stable in all modes of operation attained during the present tests. The most unstable test plateau corresponded to minimum recirculation pump speed in single-loop operation (test BFTP3). This operating condition had the minimum flow and maximum power-to-flow ratio. The estimated decay ratio in this plateau ismore » 0.53. The decay ratio decreased as the flow was increased during single-loop operation (down to 0.34 for test plateau BFTP6). This observation implies that the core-wide reactor stability follows the same trends in single-loop as it does in two-loop operation. Finally, no local or higher mode instabilities were found in the data taken from local power range monitors. The decay ratios estimated from the local power range monitors were not significantly different from those estimated from the average power range monitors.« less

  9. An Evaluation of the Ability of Amputees to Operate Highway Transport Equipment. Final Report.

    ERIC Educational Resources Information Center

    McFarland, Ross A.; And Others

    To document the driving experience of amputees and to test whether amputees differ from non-amputees in the operation of a simulated motor vehicle, related literature was reviewed, a comprehensive study of private motor vehicle operation by amputees was carried out, and 100 persons (20 non-impaired, non-commercial drivers, 20 non-impaired,…

  10. Auto Indexer Auto-Indexer for Percussive Hammers: Vane Motor Dynamometer Testing

    DOE Data Explorer

    Su, Jiann

    2012-01-01

    Objectives Options associated with geothermal drilling operations are generally limited by factors such as formation temperature and rock strength. The objective of the research is to expand the "tool box" available to the geothermal driller by furthering the development of a high-temperature drilling motor that can be used in directional drilling applications for drilling high temperature geothermal formations. The motor is specifically designed to operate in conjunction with a pneumatic down-the-hole-hammer. It provides a more compact design compared to traditional drilling motors such as PDMs (positive displacement motors). The packaging can help to enhance directional drilling capabilities. It uses no elastomeric components, which enables it to operate in higher temperatures ( >250 °F). Current work on the motor has shown that is a capable of operating under pneumatic power with a down-the-hole-hammer. Further development work will include continued testing and refining motor components and evaluating motor capabilities. Targets/Milestones Complete testing current motor - 12/31/2010 Make final material and design decisions - 01/31/2011 Build and test final prototype - 04/31/2011 Final demonstration - 07/31/2011 Impacts The development of the motor will help to achieve program technical objectives by improving well construction capabilities. This includes enabling high-temperature drilling as well as enhancing directional drilling. A key component in the auto indexer is the drive motor. It is an air-driven vane motor that converts the energy stored in the compressed air to mechanical energy. The motor is attached to hammer-like components which impart an impulsive load onto the drive shaft. The impulsive force on the drive shaft in turn creates an indexing action. A controlled test was performed to characterize the performance of the the vane motor for a given pressure. The Sandia dynamometer test station was used to determine the performance of the motor for a given input pressure.

  11. Study of Radio sources and interferences detected by MEXART

    NASA Astrophysics Data System (ADS)

    Villanueva Hernandez, P.; Gonzalez Esparza, J. A.; Carrillo, A.; Andrade, E.; Jeyacumar, S.; Kurtz, S.

    2007-05-01

    The Mexican Array Radio Telescope (MEXART) is a radio telescope that will perform studies of solar wind disturbances using the Interplanetary Scintillation (IPS) technique. The radiotelescope is its final calibration stage, and in this work we report two testings: the interference signals detected around the operation frequency, and the transit of the main radio sources detected by individual lines of 64 dipoles. These radio sources are: Sun, Casiopea, Crab nebula, Cygnus and Virgo. These testings allow us to know the response of the array elements in order to calibrate them. The final operation of the MEXART requires that the signal detected and transmitted by each East-West line of 64 dipoles arrives at the butler matrix (control room) with the same phase and amplitude.

  12. Operator learning effects in teleoperated rendezvous & docking

    NASA Astrophysics Data System (ADS)

    Wilde, M.; Harder, J.; Purschke, R.

    Teleoperation of spacecraft proximity operations and docking requires delicate timing and coordination of spacecraft maneuvers. Experience has shown that human operators show large performance fluctuations in these areas, which are a major factor to be addressed in operator training. In order to allow the quantification of the impact of these human fluctuations on control system performance and the human perception of this performance, a learning curve study was conducted with teleoperated final approach and docking scenarios. Over a period of ten experiment days, three test participants were tasked with repeatedly completing a set of three training scenarios. The scenarios were designed to contain different combinations of the major elements of any final approach and docking situation, and to feature an increasing difficulty level. The individual difficulty levels for the three operators furthermore differed in the level of operator support functions available in their human-machine interfaces. Operator performance in the test scenarios were evaluated in the fields approach success and precision, docking safety, and approach efficiency by a combination of recorded maneuver data and questionnaires. The results show that operator experience and the associated learning curves increase operator performance substantially, regardless of the support system used. The paper also shows that the fluctuations in operator performance and self-perception are substantial between as well as within experiment days, and must be reckoned with in teleoperation system design and mission planning.

  13. Experimental Investigations of the Effects of Underwater Explosions on Swimbladder Fish. I. 1973 Chesapeake Bay Tests

    DTIC Science & Technology

    1975-06-20

    H1101600 Underwater Explosions Explosion Effects on Fish Fish Lethal Ranges " Environmental Effects of Explosions 𔃺. A*STRACT reverse side It nooosemy and...effects of its research operations. When such operations involve the detonation of underwater explosions, one of the environmental factors to be evaluated...04o APPENDIX A: EXPERIMENTS WITH CRABS AND OYSTERS ......... .. A-I APPENDIX B: FINAL REPORT: ENVIRONMENTAL EFFECTS OF EXPLOSIVE TESTING

  14. Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment

    DOT National Transportation Integrated Search

    2003-09-22

    This document presents the Evaluation Teams plan for conducting the evaluation of the FOT in Washington State. A companion document exists for the evaluation of the Utah deployment. This plan includes the experimental design for testing hypotheses...

  15. Individual evaluation test plan report, No. 2 : emissions monitoring of all vehicles in Ada County : final report

    DOT National Transportation Integrated Search

    1996-04-01

    Ada County was chosen to be a part of the national Operational Test for Intelligent : Transportation Systems (ITS). ITS applies new technologies and concepts to improve : transportation systems, efficiency, mobility, energy and environmental impacts,...

  16. Modeling of unit operating considerations in generating-capacity reliability evaluation. Volume 2. Computer-program documentation. Final report. [GENESIS, OPCON and OPPLAN

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patton, A.D.; Ayoub, A.K.; Singh, C.

    1982-07-01

    This report describes the structure and operation of prototype computer programs developed for a Monte Carlo simulation model, GENESIS, and for two analytical models, OPCON and OPPLAN. It includes input data requirements and sample test cases.

  17. Pulse Jet Mixing Tests With Noncohesive Solids

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Meyer, Perry A.; Bamberger, Judith A.; Enderlin, Carl W.

    2012-02-17

    This report summarizes results from pulse jet mixing (PJM) tests with noncohesive solids in Newtonian liquid. The tests were conducted during FY 2007 and 2008 to support the design of mixing systems for the Hanford Waste Treatment and Immobilization Plant (WTP). Tests were conducted at three geometric scales using noncohesive simulants, and the test data were used to develop models predicting two measures of mixing performance for full-scale WTP vessels. The models predict the cloud height (the height to which solids will be lifted by the PJM action) and the critical suspension velocity (the minimum velocity needed to ensure allmore » solids are suspended off the floor, though not fully mixed). From the cloud height, the concentration of solids at the pump inlet can be estimated. The predicted critical suspension velocity for lifting all solids is not precisely the same as the mixing requirement for 'disturbing' a sufficient volume of solids, but the values will be similar and closely related. These predictive models were successfully benchmarked against larger scale tests and compared well with results from computational fluid dynamics simulations. The application of the models to assess mixing in WTP vessels is illustrated in examples for 13 distinct designs and selected operational conditions. The values selected for these examples are not final; thus, the estimates of performance should not be interpreted as final conclusions of design adequacy or inadequacy. However, this work does reveal that several vessels may require adjustments to design, operating features, or waste feed properties to ensure confidence in operation. The models described in this report will prove to be valuable engineering tools to evaluate options as designs are finalized for the WTP. Revision 1 refines data sets used for model development and summarizes models developed since the completion of Revision 0.« less

  18. The test of VLSI circuits

    NASA Astrophysics Data System (ADS)

    Baviere, Ph.

    Tests which have proven effective for evaluating VLSI circuits for space applications are described. It is recommended that circuits be examined after each manfacturing step to gain fast feedback on inadequacies in the production system. Data from failure modes which occur during operational lifetimes of circuits also permit redefinition of the manufacturing and quality control process to eliminate the defects identified. Other tests include determination of the operational envelope of the circuits, examination of the circuit response to controlled inputs, and the performance and functional speeds of ROM and RAM memories. Finally, it is desirable that all new circuits be designed with testing in mind.

  19. Recommended Changes to Interval Management to Achieve Operational Implementation

    NASA Technical Reports Server (NTRS)

    Baxley, Brian; Swieringa, Kurt; Roper, Roy; Hubbs, Clay; Goess, Paul; Shay, Richard

    2017-01-01

    A 19-day flight test of an Interval Management (IM) avionics prototype was conducted in Washington State using three aircraft to precisely achieve and maintain a spacing interval behind the preceding aircraft. NASA contracted with Boeing, Honeywell, and United Airlines to build this prototype, and then worked closely with them, the FAA, and other industry partners to test this prototype in flight. Four different IM operation types were investigated during this test in the en route, arrival, and final approach phases of flight. Many of the IM operations met or exceeded the design goals established prior to the test. However, there were issues discovered throughout the flight test, including the rate and magnitude of IM commanded speed changes and the difference between expected and actual aircraft deceleration rates.

  20. Current status and some future test directions for the U.S. National Transonic Facility

    NASA Technical Reports Server (NTRS)

    Gloss, Blair B.

    1992-01-01

    The construction of the National Transonic Facility was completed in September 1982 and the start-up and checkout of the tunnel systems were performed over the following two years. In August 1984, the facility was declared operational for final checkout of cryogenic instrumentation and control systems, and for the aerodynamics calibration and testing to commence. Since 1984 several operational problems have been identified and successfully solved which is demonstrated by the fact that the facility has operated the last year with no significant facility down times. Also during this time period, development of test techniques and instrumentation has continued. This paper will review some of the recent test techniques and instrumentation developments, and will briefly review the status of the facility.

  1. Real time test bed development for power system operation, control and cyber security

    NASA Astrophysics Data System (ADS)

    Reddi, Ram Mohan

    The operation and control of the power system in an efficient way is important in order to keep the system secure, reliable and economical. With advancements in smart grid, several new algorithms have been developed for improved operation and control. These algorithms need to be extensively tested and validated in real time before applying to the real electric power grid. This work focuses on the development of a real time test bed for testing and validating power system control algorithms, hardware devices and cyber security vulnerability. The test bed developed utilizes several hardware components including relays, phasor measurement units, phasor data concentrator, programmable logic controllers and several software tools. Current work also integrates historian for power system monitoring and data archiving. Finally, two different power system test cases are simulated to demonstrate the applications of developed test bed. The developed test bed can also be used for power system education.

  2. Possibilities and testing of CPRNG in block cipher mode of operation PM-DC-LM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zacek, Petr; Jasek, Roman; Malanik, David

    2016-06-08

    This paper discusses the chaotic pseudo-random number generator (CPRNG), which is used in block cipher mode of operation called PM-DC-LM. PM-DC-LM is one of possible subversions of general PM mode. In this paper is not discussed the design of PM-DC-LM, but only CPRNG as a part of it because designing is written in other papers. Possibilities, how to change or to improve CPRNG are mentioned. The final part is devoted for a little testing of CPRNG and some testing data are shown.

  3. A 9700-hour durability test of a five centimeter diameter ion thruster

    NASA Technical Reports Server (NTRS)

    Nakanishi, S.; Finke, R. C.

    1973-01-01

    A modified Hughes SIT-5 thrustor has been life-tested at the Lewis Research Center. The final 2700 hours of the test are described with a charted history of thrustor operating parameters and off-normal events. Performance and operating characteristics were nearly constant throughout the test except for neutralizer heater power requirements and accelerator drain current. A post-shutdown inspection revealed sputter erosion of ion chamber components and component flaking of sputtered metal. Several flakes caused beamlet divergence and anomalous grid erosion, causing the test to be terminated. All sputter erosion sources have been identified and promising sputter resistant components are currently being evaluated.

  4. Prototype test article verification of the Space Station Freedom active thermal control system microgravity performance

    NASA Technical Reports Server (NTRS)

    Chen, I. Y.; Ungar, E. K.; Lee, D. Y.; Beckstrom, P. S.

    1993-01-01

    To verify the on-orbit operation of the Space Station Freedom (SSF) two-phase external Active Thermal Control System (ATCS), a test and verification program will be performed prior to flight. The first system level test of the ATCS is the Prototype Test Article (PTA) test that will be performed in early 1994. All ATCS loops will be represented by prototypical components and the line sizes and lengths will be representative of the flight system. In this paper, the SSF ATCS and a portion of its verification process are described. The PTA design and the analytical methods that were used to quantify the gravity effects on PTA operation are detailed. Finally, the gravity effects are listed, and the applicability of the 1-g PTA test results to the validation of on-orbit ATCS operation is discussed.

  5. Development of Emergency Intravehicular Spacesuit (EIS) assembly

    NASA Technical Reports Server (NTRS)

    1973-01-01

    A program was undertaken to develop and test two prototype pressure suits to operate at pressures up to 413 mm Hg (8.0 PSIG). The units were designated Emergency Intravehicular Spacesuits (EIS). Performance requirements, design evolution, testing performed, problems encountered, and final EIS configuration are reported.

  6. N.S. SAVANNAH, DRAFT OF FINAL SAFEGUARDS REPORT TEST, START-UP AND TRIALS, NEW YORK SHIPBUILDING CORPORATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1960-04-01

    The N. S. Savannah program for testing, start-up, and initial operation of all reactor and propulsion components and systems is discussed. Definitions of test phases are given and various stages of the test program are outlined. A list of tests for the various reactor, propulsion, and other system components is included. (C.J.G.)

  7. Fuel System Durability--U.S. Coast Guard

    DTIC Science & Technology

    2008-05-01

    bypass rates at the rated operating condition to finalize the test loop design. Preliminary calculations suggest that because of the anticipated low...The other option was to allow greater speed variability and operate as close to full-rack as possible. 24 Wear Scar Approx. Activated Area...Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202- 4302

  8. Preliminary measurements on heat balance in pneumatic tires

    NASA Technical Reports Server (NTRS)

    Nybakken, G. H.; Collart, D. Y.; Staples, R. J.; Lackey, J. I.; Clark, S. K.; Dodge, R. N.

    1973-01-01

    A variety of tests was undertaken to determine the nature of heat generation associated with a pneumatic tire operating under various conditions. Tests were conducted to determine the magnitude and distribution of internally generated heat caused by hysteresis in the rubber and ply fabric in an automobile tire operating under conditions of load, pressure, and velocity representative of normal operating conditions. These included tests at various yaw angles and tests with braking applied. In other tests, temperature sensors were mounted on a road to measure the effect of a tire rolling over and an attempt was made to deduce the magnitude and nature of interfacial friction from the resulting information. In addition, tests were performed using the scratch plate technique to determine the nature of the motion between the tire and road. Finally, a model tire was tested on a roadwheel, the surface covering which could be changed, and an optical pyrometer was used to measure rubber surface temperatures.

  9. Validity Study in Multidimensional Latent Space and Efficient Computerized Adaptive Testing. Final Report.

    ERIC Educational Resources Information Center

    Samejima, Fumiko

    This paper is the final report of a multi-year project sponsored by the Office of Naval Research (ONR) in 1987 through 1990. The main objectives of the research summarized were to: investigate the non-parametric approach to the estimation of the operating characteristics of discrete item responses; revise and strengthen the package computer…

  10. Controlled field testing : Puget Sound Help Me (PuSHMe) operational test. Task 2 technical memorandum : final report

    DOT National Transportation Integrated Search

    1997-10-01

    This report provides a general introduction to the use of panel designs in transportation surveys. Through examples drawn from the transportation literature, it illustrates how panel designs can be used to address a variety of transportation issues. ...

  11. Cocurrent scrubber evaluation TVA's Colbert Lime--Limestone Wet-Scrubbing Pilot Plant. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robards, R.F.; Moore, N.D.; Kelso, T.M.

    1979-01-01

    The Tennessee Valley Authority (TVA) is actively engaged in a pilot plant program to develop and/or evaluate wet-scrubbing processes for removing sulfur dioxide (SO/sub 2/) from boiler flue gas. The physical size and general arrangement of flue gas scrubbing systems have a major impact on capital investment and operating cost, as do potential operating and maintenance advantages inherent to some systems. The equipment configuration for a cocurrent scrubber reflects some of these advantages. EPRI funded TVA to perform preliminary screening tests of TVA's 1 MW pilot plant (Colbert Steam Plant) to develop operating data on the cocurrent design for usemore » in designing and operating a 10 MW prototype cocurrent scrubber at TVA's Shawnee Scrubber Test Facility. Results of the Colbert tests showed excellent sulfur dioxide removal efficiencies, generally greater than 85%, low pressure drop, and high particulate removal efficiencies. This report covers these screening tests.« less

  12. Performance and Environmental Test Results of the High Voltage Hall Accelerator Engineering Development Unit

    NASA Technical Reports Server (NTRS)

    Kamhawi, Hani; Haag, Thomas; Huang, Wensheng; Shastry, Rohit; Pinero, Luis; Peterson, Todd; Mathers, Alex

    2012-01-01

    NASA Science Mission Directorate's In-Space Propulsion Technology Program is sponsoring the development of a 3.5 kW-class engineering development unit Hall thruster for implementation in NASA science and exploration missions. NASA Glenn and Aerojet are developing a high fidelity high voltage Hall accelerator that can achieve specific impulse magnitudes greater than 2,700 seconds and xenon throughput capability in excess of 300 kilograms. Performance, plume mappings, thermal characterization, and vibration tests of the high voltage Hall accelerator engineering development unit have been performed. Performance test results indicated that at 3.9 kW the thruster achieved a total thrust efficiency and specific impulse of 58%, and 2,700 sec, respectively. Thermal characterization tests indicated that the thruster component temperatures were within the prescribed material maximum operating temperature limits during full power thruster operation. Finally, thruster vibration tests indicated that the thruster survived the 3-axes qualification full-level random vibration test series. Pre and post-vibration test performance mappings indicated almost identical thruster performance. Finally, an update on the development progress of a power processing unit and a xenon feed system is provided.

  13. Oscillating-flow regenerator test rig

    NASA Technical Reports Server (NTRS)

    Wood, J. G.; Gedeon, D. R.

    1994-01-01

    This report summarizes work performed in setting up and performing tests on a regenerator test rig. An earlier status report presented test results, together with heat transfer correlations, for four regenerator samples (two woven screen samples and two felt metal samples). Lessons learned from this testing led to improvements to the experimental setup, mainly instrumentation as well as to the test procedure. Given funding and time constraints for this project it was decided to complete as much testing as possible while the rig was set up and operational, and to forego final data reduction and analysis until later. Additional testing was performed on several of the previously tested samples as well an on five newly fabricated samples. The following report is a summary of the work performed at OU, with many of the final test results included in raw data form.

  14. Hypersonic Research Vehicle (HRV) real-time flight test support feasibility and requirements study. Part 2: Remote computation support for flight systems functions

    NASA Technical Reports Server (NTRS)

    Rediess, Herman A.; Hewett, M. D.

    1991-01-01

    The requirements are assessed for the use of remote computation to support HRV flight testing. First, remote computational requirements were developed to support functions that will eventually be performed onboard operational vehicles of this type. These functions which either cannot be performed onboard in the time frame of initial HRV flight test programs because the technology of airborne computers will not be sufficiently advanced to support the computational loads required, or it is not desirable to perform the functions onboard in the flight test program for other reasons. Second, remote computational support either required or highly desirable to conduct flight testing itself was addressed. The use is proposed of an Automated Flight Management System which is described in conceptual detail. Third, autonomous operations is discussed and finally, unmanned operations.

  15. Effects of extended lay-off periods on performance and operator trust under adaptable automation.

    PubMed

    Chavaillaz, Alain; Wastell, David; Sauer, Jürgen

    2016-03-01

    Little is known about the long-term effects of system reliability when operators do not use a system during an extended lay-off period. To examine threats to skill maintenance, 28 participants operated twice a simulation of a complex process control system for 2.5 h, with an 8-month retention interval between sessions. Operators were provided with an adaptable support system, which operated at one of the following reliability levels: 60%, 80% or 100%. Results showed that performance, workload, and trust remained stable at the second testing session, but operators lost self-confidence in their system management abilities. Finally, the effects of system reliability observed at the first testing session were largely found again at the second session. The findings overall suggest that adaptable automation may be a promising means to support operators in maintaining their performance at the second testing session. Copyright © 2015 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  16. Pre-Launch Radiometric Performance Characterization of the Advanced Technology Microwave Sounder on the Joint Polar Satellite System-1 Satellite

    NASA Technical Reports Server (NTRS)

    Smith, Craig K.; Kim, Edward; Leslie, R. Vincent; Lyu, Joseph; McCormick, Lisa M.; Anderson, Kent

    2017-01-01

    The Advanced Technology Microwave Sounder (ATMS) is a space-based, cross-track radiometer for operational atmospheric temperature and humidity sounding, utilizing 22 channels over a frequency range from 23 to 183 gigahertz. The ATMS for the Joint Polar Satellite System-1 has undergone two rounds of re-work in 2014-2015 and 2016, following performance issues discovered during and following thermal vacuum chamber (TVAC) testing at the instrument and observatory level. Final shelf-level testing, including measurement of pass band characteristics and spectral response functions, was completed in December 2016. Final instrument-level TVAC testing and calibration occurred during February 2017. Here we will describe the instrument-level TVAC calibration process, and illustrate with results from the final TVAC calibration effort.

  17. The final days of Solar Max - Lessons learned from engineering evaluation tests

    NASA Technical Reports Server (NTRS)

    Donnelly, Michael L.; Croft, John W.; Ward, David K.; Thames, Michael A.

    1990-01-01

    End-of-life engineering evaluation tests were performed on Solar Max between October and November 1989. The tests included four-wheel control law operation; reaction wheel rundowns; modular power subsystem standard power regulator unit voltage-temperature level tests; battery rundown/2nd plateau determination; high gain antenna retraction and jettison; and solar array jettison. This paper presents these tests, their results, and the lessons learned from them.

  18. Successful completion of a cyclic ground test of a mercury ion auxiliary propulsion system

    NASA Technical Reports Server (NTRS)

    Francisco, David R.; Low, Charles A., Jr.; Power, John L.

    1988-01-01

    An engineering model Ion Auxiliary Propulsion System (IAPS) 8-cm thruster (S/N 905) has completed a life test at NASA Lewis Research Center. The mercury ion thruster successfully completed and exceeded the test goals of 2557 on/off cycles and 7057 hr of operation at full thrust. The final 1200 cycles and 3600 hr of the life test were conducted using an engineering model of the IAPS power electronics unit (PEU) and breadboard digital controller and interface unit (DCIU). This portion of the test is described in this paper with a charted history of thruster operating parameters and off-normal events. Performance and operating characteristics were constant throughout the test with only minor variations. The engineering model power electronics unit operated without malfunction; the flight software in the digital controller and interface unit was exercised and verified. Post-test inspection of the thruster revealed facility enhanced accelerator grid erosion but overall the thruster was in good condition. It was concluded that the thruster performance was not drastically degraded by time or cycles. Additional cyclic testing is currently under consideration.

  19. Successful completion of a cyclic ground test of a mercury Ion Auxiliary Propulsion System

    NASA Technical Reports Server (NTRS)

    Francisco, David R.; Low, Charles A., Jr.; Power, John L.

    1988-01-01

    An engineering model Ion Auxiliary Propulsion System (IAPS) 8-cm thruster (S/N 905) has completed a life test at NASA Lewis Research Center. The mercury ion thruster successfully completed and exceeded the test goals of 2557 on/off cycles and 7057 hr of operation at full thrust. The final 1200 cycles and 3600 hr of the life test were conducted using an engineering model of the IAPS power electronics unit (PEU) and breadboard digital controller and interface unit (DCIU). This portion of the test is described in this paper with a charted history of thruster operating parameters and off-normal events. Performance and operating characteristics were constant throughout the test with only minor variations. The engineering model power electronics unit operated without malfunction; the flight software in the digital controller and interface unit was exercised and verified. Post-test inspection of the thruster revealed facility enhanced accelerator grid erosion but overall the thruster was in good condition. It was concluded that the thruster performance was not drastically degraded by time or cycles. Additional cyclic testing is currently under consideration.

  20. Orbital Express Advanced Video Guidance Sensor: Ground Testing, Flight Results and Comparisons

    NASA Technical Reports Server (NTRS)

    Pinson, Robin M.; Howard, Richard T.; Heaton, Andrew F.

    2008-01-01

    Orbital Express (OE) was a successful mission demonstrating automated rendezvous and docking. The 2007 mission consisted of two spacecraft, the Autonomous Space Transport Robotic Operations (ASTRO) and the Next Generation Serviceable Satellite (NEXTSat) that were designed to work together and test a variety of service operations in orbit. The Advanced Video Guidance Sensor, AVGS, was included as one of the primary proximity navigation sensors on board the ASTRO. The AVGS was one of four sensors that provided relative position and attitude between the two vehicles. Marshall Space Flight Center was responsible for the AVGS software and testing (especially the extensive ground testing), flight operations support, and analyzing the flight data. This paper briefly describes the historical mission, the data taken on-orbit, the ground testing that occurred, and finally comparisons between flight data and ground test data for two different flight regimes.

  1. 75 FR 33357 - Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-11

    ... or asked to report: Licensees and applicants for nuclear power plants and research and test... detailed review of applications for licenses and amendments thereto to construct and operate nuclear power plants, preliminary or final design approvals, design certifications, research and test facilities...

  2. Capacitance discharge system for ignition of Single Bridge Apollo Standard Initiators (SBASI)

    NASA Technical Reports Server (NTRS)

    Ward, R. D.

    1974-01-01

    The design support data developed during the single bridge Apollo standard initiator (SBASI) program are presented. A circuit was designed and bread-board tested to verify operational capabilities of the circuit. Test data, design criteria, weight, and reliability trade-off considerations, and final design recommendations are reported.

  3. Updates on HRF Payloads Operations in Columbus ATCS

    NASA Technical Reports Server (NTRS)

    DePalo, Savino; Wright, Bruce D.; La,e Robert E.; Challis, Simon; Davenport, Robert; Pietrafesa, Donata

    2011-01-01

    The NASA developed Human Research Facility 1 (HRF1) and Human Research Facility (HRF2) experiment racks have been operating in the European Space Agency (ESA) Columbus module of the International Space Station (ISS) since Summer 2008. The two racks are of the same design. Since the start of operations, unexpected pressure spikes were observed in the Columbus module's thermal-hydraulic system during the racks activation sequence. The root cause of these spikes was identified in the activation command sequence in the Rack Interface Controller (RIC), which controls the flow of thermal-hydraulic system fluid through the rack. A new Common RIC Software (CRS) release fixed the bug and was uploaded on both racks in late 2009. This paper gives a short introduction to the topic, describes the Columbus module countermeasures to mitigate the spikes, describes the ground validation test of the new software, and describes the flight checks performed before and after the final upload. Finally, the new on-orbit test designed to further simplify the racks hydraulic management is presented.

  4. Telecommunications and data acquisition systems support for Voyager missions to Jupiter and Saturn, 1972-1981, prelaunch through Saturn encounter

    NASA Technical Reports Server (NTRS)

    Traxler, M. R.; Beauchamp, D. F.

    1983-01-01

    The Deep Space Network has supported the Voyager Project for approximately nine years, during which time implementation, testing, and operational support was provided. Four years of this time involved testing prior to launch; the final five years included network operations support and additional network implementation. Intensive and critical support intervals included launch and four planetary encounters. The telecommunications and data acquisition support for the Voyager Missions to Jupiter and Saturn are summarized.

  5. Thermal Environmental Testing of NSTAR Engineering Model Ion Thrusters

    NASA Technical Reports Server (NTRS)

    Rawlin, Vincent K.; Patterson, Michael J.; Becker, Raymond A.

    1999-01-01

    NASA's New Millenium program will fly a xenon ion propulsion system on the Deep Space 1 Mission. Tests were conducted under NASA's Solar Electric Propulsion Technology Applications Readiness (NSTAR) Program with 3 different engineering model ion thrusters to determine thruster thermal characteristics over the NSTAR operating range in a variety of thermal environments. A liquid nitrogen-cooled shroud was used to cold-soak the thruster to -120 C. Initial tests were performed prior to a mature spacecraft design. Those results and the final, severe, requirements mandated by the spacecraft led to several changes to the basic thermal design. These changes were incorporated into a final design and tested over a wide range of environmental conditions.

  6. Testing of a femtosecond pulse laser in outer space

    PubMed Central

    Lee, Joohyung; Lee, Keunwoo; Jang, Yoon-Soo; Jang, Heesuk; Han, Seongheum; Lee, Sang-Hyun; Kang, Kyung-In; Lim, Chul-Woo; Kim, Young-Jin; Kim, Seung-Woo

    2014-01-01

    We report a test operation of an Er-doped fibre femtosecond laser which was conducted for the first time in outer space. The fibre-based ultrashort pulse laser payload was designed to meet space-use requirements, undergone through ground qualification tests and finally launched into a low-earth orbit early in 2013. Test results obtained during a one-year mission lifetime confirmed stable mode-locking all the way through although the radiation induced attenuation (RIA) in the Er-doped gain fibre caused an 8.6% reduction in the output power. This successful test operation would help facilitate diverse scientific and technological applications of femtosecond lasers in space and earth atmosphere in the near future. PMID:24875665

  7. Testing of a femtosecond pulse laser in outer space.

    PubMed

    Lee, Joohyung; Lee, Keunwoo; Jang, Yoon-Soo; Jang, Heesuk; Han, Seongheum; Lee, Sang-Hyun; Kang, Kyung-In; Lim, Chul-Woo; Kim, Young-Jin; Kim, Seung-Woo

    2014-05-30

    We report a test operation of an Er-doped fibre femtosecond laser which was conducted for the first time in outer space. The fibre-based ultrashort pulse laser payload was designed to meet space-use requirements, undergone through ground qualification tests and finally launched into a low-earth orbit early in 2013. Test results obtained during a one-year mission lifetime confirmed stable mode-locking all the way through although the radiation induced attenuation (RIA) in the Er-doped gain fibre caused an 8.6% reduction in the output power. This successful test operation would help facilitate diverse scientific and technological applications of femtosecond lasers in space and earth atmosphere in the near future.

  8. Design and prototype fabrication of a 30 tesla cryogenic magnet

    NASA Technical Reports Server (NTRS)

    Prok, G. M.; Swanson, M. C.; Brown, G. V.

    1977-01-01

    A liquid neon cooled magnet was designed to produce 30 teslas in steady operation. To ensure the correctness of the heat transfer relationships used, supercritical neon heat transfer tests were made. Other tests made before the final design included tests on the effect of the magnetic field on pump motors, tensile shear tests on the cryogenic adhesives, and simulated flow studies for the coolant. The magnet will consist of two pairs of coils, cooled by forced convection of supercritical neon. Heat from the supercritical neon will be rejected through heat exchangers which are made of roll bonded copper panels and are submerged in a pool of saturated liquid neon. A partial mock up coil was wound to identify the tooling required to wind the magnet. This was followed by winding a prototype pair of coils. The prototype winding established procedures for fabricating the final magnet and revealed slight changes needed in the final design.

  9. Cold Test Operation of the German VEK Vitrification Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fleisch, J.; Schwaab, E.; Weishaupt, M.

    2008-07-01

    In 2007 the German High-Level Liquid Waste (HLLW) Vitrification plant VEK (Verglasungseinrichtung Karlsruhe) has passed a three months integral cold test operation as final step before entering the hot phase. The overall performance of the vitrification process equipment with a liquid-fed ceramic glass melter as main component proved to be completely in line with the requirements of the regulatory body. The retention efficiency of main radioactive-bearing elements across melter and wet off-gas treatment system exceeded the design values distinctly. The strategy to produce a specified waste glass could be successfully demonstrated. The results of the cold test operation allow enteringmore » the next step of hot commissioning, i.e. processing of approximately 2 m{sup 3} of diluted HLLW. In summary: An important step of the VEK vitrification plant towards hot operation has been the performance of the cold test operation from April to July 2007. This first integral operation was carried out under boundary conditions and rules established for radioactive operation. Operation and process control were carried out following the procedure as documented in the licensed operational manuals. The function of the process technology and the safe operation could be demonstrated. No severe problems were encountered. Based on the positive results of the cold test, application of the license for hot operation has been initiated and is expected in the near future. (authors)« less

  10. TOP 01-1-011B Vehicle Test Facilities at Aberdeen Test Center and Yuma Test Center

    DTIC Science & Technology

    2017-12-12

    TYPE Final 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Test Operations Procedure (TOP) 01-1-011B Vehicle Test Facilities at Aberdeen... Test Center and Yuma Test Center 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHORS 5d. PROJECT NUMBER 5e... Test Center 400 Colleran Road Aberdeen Proving Ground, MD 21005-5059 U.S. Army Yuma Proving Ground Yuma Test Center 301 C. Street Yuma, AZ

  11. A user-centred design process of new cold-protective clothing for offshore petroleum workers operating in the Barents Sea

    PubMed Central

    NAESGAARD, Ole Petter; STORHOLMEN, Tore Christian Bjørsvik; WIGGEN, Øystein Nordrum; REITAN, Jarl

    2017-01-01

    Petroleum operations in the Barents Sea require personal protective clothing (PPC) to ensure the safety and performance of the workers. This paper describes the accomplishment of a user-centred design process of new PPC for offshore workers operating in this area. The user-centred design process was accomplished by mixed-methods. Insights into user needs and context of use were established by group interviews and on-the-job observations during a field-trip. The design was developed based on these insights, and refined by user feedback and participatory design. The new PPC was evaluated via field-tests and cold climate chamber tests. The insight into user needs and context of use provided useful input to the design process and contributed to tailored solutions. Providing users with clothing prototypes facilitated participatory design and iterations of design refinement. The group interviews following the final field test showed consensus of enhanced user satisfaction compared to PPC in current use. The final cold chamber test indicated that the new PPC provides sufficient thermal protection during the 60 min of simulated work in a wind-chill temperature of −25°C. Conclusion: Accomplishing a user-centred design process contributed to new PPC with enhanced user satisfaction and included relevant functional solutions. PMID:29046494

  12. A user-centred design process of new cold-protective clothing for offshore petroleum workers operating in the Barents Sea.

    PubMed

    Naesgaard, Ole Petter; Storholmen, Tore Christian Bjørsvik; Wiggen, Øystein Nordrum; Reitan, Jarl

    2017-12-07

    Petroleum operations in the Barents Sea require personal protective clothing (PPC) to ensure the safety and performance of the workers. This paper describes the accomplishment of a user-centred design process of new PPC for offshore workers operating in this area. The user-centred design process was accomplished by mixed-methods. Insights into user needs and context of use were established by group interviews and on-the-job observations during a field-trip. The design was developed based on these insights, and refined by user feedback and participatory design. The new PPC was evaluated via field-tests and cold climate chamber tests. The insight into user needs and context of use provided useful input to the design process and contributed to tailored solutions. Providing users with clothing prototypes facilitated participatory design and iterations of design refinement. The group interviews following the final field test showed consensus of enhanced user satisfaction compared to PPC in current use. The final cold chamber test indicated that the new PPC provides sufficient thermal protection during the 60 min of simulated work in a wind-chill temperature of -25°C. Accomplishing a user-centred design process contributed to new PPC with enhanced user satisfaction and included relevant functional solutions.

  13. TIPP. Training Incentive Payments Program. Five Year's Operations. Final Report.

    ERIC Educational Resources Information Center

    Institute of Public Administration, New York, NY.

    A report is made of the first operating phase from March 1970 through May 1971 of a test of the feasibility of using financial incentives to stimulate more effective upgrading of the skills and earnings of low income workers in the private sector. TIPP provides incentive payments to employers based on results achieved. Program administration…

  14. Preparing Pilots for Takeoff

    ERIC Educational Resources Information Center

    Ravage, Barbara

    2012-01-01

    Why would schools consider partnering with a vendor to operate a pilot? Why not just wait until the final product is released? For starters, pilots provide schools with a golden opportunity to get an early look at the software, take it for a test flight, and ask for changes tailored to their operating environment and business needs. In some cases,…

  15. Terry Turbopump Expanded Operating Band Full-Scale Component and Basic Science Detailed Test Plan - Final.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Osborn, Douglas; Solom, Matthew

    This document details the milestone approach to define the true operating limitations (margins) of the Terry turbopump systems used in the nuclear industry for Milestone 3 (full-scale component experiments) and Milestone 4 (Terry turbopump basic science experiments) efforts. The overall multinational-sponsored program creates the technical basis to: (1) reduce and defer additional utility costs, (2) simplify plant operations, and (3) provide a better understanding of the true margin which could reduce overall risk of operations.

  16. Final Report of the Panel on the Department of Defense Human Capital Strategy

    DTIC Science & Technology

    2008-01-01

    has served as a member of the Board on Testing and Assessment of the National Research Council. Dr. Pearlman is a Fellow of the American Psychological ...22 Pilot- Test Selected Options...approaches to system operation. The aim of developing options would be to obtain evaluative feedback, such as from later pilot- testing , on the relative

  17. A Study of Impulsivity in Low-Achieving and High-Achieving Boys from Lower Income Homes. Final Report.

    ERIC Educational Resources Information Center

    Cohen, Shirley

    The purpose of this study was to explore the concept of impulsivity as a stylistic dimension affecting cognitive behavior, and whether impulsivity operates as a comprehensive, inflexible orientation in low achievers more than in high achievers. The Matching Familiar Figures Test, the Porteus Maze Test, and the Stroop Color-Word Test were used to…

  18. The Thirty Meter Telescope Site Testing Robotic Computer System

    NASA Astrophysics Data System (ADS)

    Riddle, Reed L.; Schöck, M.; Skidmore, W.; Els, S.; Travouillon, T.

    2008-03-01

    The Thirty Meter Telescope (TMT) project is currently testing five remote sites as candidates for the final location of the telescope. Each site has several instruments, including seeing monitors, weather stations, and turbulence profile measuring systems, each of which is computer controlled. As the sites are remote, they require a control system that can automatically manage the operations of all the varied subsystems, keep the systems safe from damage and recover from errors during operation. The robotic system must also be robust enough to operate without human intervention and when internet connections are lost. It is also critical that a data archiving system diligently records all data as gathered. This is a discussion of the TMT site testing robotic computer system as implemented.

  19. Technology Implementation Plan: Irradiation Testing and Qualification for Nuclear Thermal Propulsion Fuel

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harrison, Thomas J.; Howard, Richard H.; Rader, Jordan D.

    This document is a notional technology implementation plan (TIP) for the development, testing, and qualification of a prototypic fuel element to support design and construction of a nuclear thermal propulsion (NTP) engine, specifically its pre-flight ground test. This TIP outlines a generic methodology for the progression from non-nuclear out-of-pile (OOP) testing through nuclear in-pile (IP) testing, at operational temperatures, flows, and specific powers, of an NTP fuel element in an existing test reactor. Subsequent post-irradiation examination (PIE) will occur in existing radiological facilities. Further, the methodology is intended to be nonspecific with respect to fuel types and irradiation or examinationmore » facilities. The goals of OOP and IP testing are to provide confidence in the operational performance of fuel system concepts and provide data to program leadership for system optimization and fuel down-selection. The test methodology, parameters, collected data, and analytical results from OOP, IP, and PIE will be documented for reference by the NTP operator and the appropriate regulatory and oversight authorities. Final full-scale integrated testing would be performed separately by the reactor operator as part of the preflight ground test.« less

  20. The US National Transonic Facility, NTF

    NASA Technical Reports Server (NTRS)

    Bruce, Walter E., Jr.; Gloss, Blair B.

    1989-01-01

    The construction of the National Transonic Facility was completed in September 1982 and the start-up and checkout of tunnel systems were performed over the next two years. In August 1984, the Operational Readiness Review (ORR) was conducted and the facility was declared operational for final checkout of cryogenic instrumentation and control systems, and for the aerodynamic calibration and testing to commence. Also, the model access system for the cryogenic mode of operation would be placed into operation along with tunnel testing. Since the ORR, a host of operating problems resulting from the cryogenic environment were identified and solved. These range from making mechanical and electrical systems functional to eliminating temperature induced model vibration to coping with the outgassing of moisture from the thermal insulation. Additionally, a series of aerodynamic tests have demonstrated data quality and provided research data on several configurations. Some of the more significant efforts are reviewed since the ORR and the NTF status concerning hardware, instrumentation and process controls systems, operating constraints imposed by the cryogenic environment, and data quality are summarized.

  1. 77 FR 47380 - Final National Pollutant Discharge Elimination System (NPDES) General Permit for Discharges From...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-08

    ... permit. Major changes also include definition of ``operator'', acute toxicity test for produced water... Category as authorized by section 402 of the Clean Water Act, (CWA). This permit renewal authorizes... considered all comments received and makes few changes to the proposed permit: pH limit for formation test...

  2. U.S. Naval Research Laboratory Final Analysis Report to NATO Above Water Warfare Capabilities Group 2016 Naval Electromagnetic Operations Trials

    DTIC Science & Technology

    2017-05-23

    Systems and the NRL Code 5763 Radio Frequency (RF) Stimulator. It includes and covers system descriptions , setup, data collection, and test goals that...6 4. Test Asset Descriptions ...7 4.1. Description of FOXTROT Anti-ship Missile (ASM) Simulator ......................................... 7

  3. 75 FR 2926 - Pipeline Safety: Reporting Drug and Alcohol Test Results for Contractors and Multiple Operator...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-19

    ... Management Information System (DAMIS) to allow the reporting of contractor data without duplication and will begin collecting annual drug and alcohol testing data for contractor employees with Management... regulated by 49 CFR Parts 192, 193, and 195. In a final rule titled ``Management Information System (MIS...

  4. Development and testing of a new disposable sterile device for labelling white blood cells.

    PubMed

    Signore, A; Glaudemans, A W J M; Malviya, G; Lazzeri, E; Prandini, N; Viglietti, A L; De Vries, E F J; Dierckx, R A J O

    2012-08-01

    White blood cell (WBC) labelling requires isolation of cells from patient's blood under sterile conditions using sterile materials, buffers and disposables under good manufacturing practice (GMP) conditions. Till now, this limited the use of white blood cell scintigraphy (WBC-S) only to well equipped laboratories with trained personnel. We invented, developed and tested a disposable, sterile, closed device for blood manipulation, WBC purification and radionuclide labelling without exposing patient's blood and the operator to contamination risks. This device prototype and a final industrialized device (Leukokit®) were tested for WBC labelling and compared to standard procedure. Leukokit® was also tested in an international multi-centre study for easiness of WBC purification and labelling. On the device prototype we tested in parallel, with blood samples from 7 volunteers, the labelling procedure compared to the standard procedure of the International Society of Radiolabeled Blood Elements (ISORBE) consensus protocol with respect to cell recovery, labelling efficiency (LE), cell viability (Trypan Blue test) and sterility (haemoculture). On the final Leukokit® we tested the biocompatibility of all components, and again the LE, erythro-sedimentation rate, cell viability, sterility and apyrogenicity. ACD-A, HES and PBS provided by Leukokit® were also compared to Heparin, Dextran and autologous plasma, respectively. In 4 samples, we tested the chemotactic activity of purified WBC against 1 mg/ml of lipopolysaccharide (LPS) and chemotaxis of 99mTc-HMPAO-labelled WBC (925 MBq) was compared to that of unlabelled cells. For the multi-centre study, 70 labellings were performed with the Leukokit® by 9 expert operators and 3 beginners from five centers using blood from both patients and volunteers. Finally, Media-Fill tests were performed by 3 operators on two different days (11 procedures) by replacing blood and kit reagents with bacterial culture media (Tryptic Soy Broth) and testing sterility of aliquots of the medium at the end of procedure. Tests performed with the prototype showed no significant differences with the standard procedure but a faster and safer approach. Tests performed with the final Leukokit® confirmed full biocompatibility, sterility and apyrogenicity of all reagents and plastic ware. Average WBC recovery with Leukokit® was comparable to that of the ISORBE protocol (117x106±24x106 vs. 132x106±29x106 cells, P=not significant). No differences in red blood cells and platelet content were observed. LE was 82% ± 3% for Leukokit® and 65±5% for control (P=0.0003) being PBS vs autologous plasma the main reason of such difference. Cell viability was always >99.9% in both conditions. Chemotactic tests showed no differences between all Leukokit® samples and controls. Haemocultures and Media-Fill tests were always sterile. The procedure was well accepted by expert operators and beginners, with a very fast learning curve (confidence after 2±2 labellings). The invented device offers high level of protection to operators and patients. The derived Leukokit® is safe and easy to use, and gives a high LE of WBC without affecting cell viability and function. Being a registered closed, sterile medical device, it may allow easier and faster WBC labelling that is not limited to only well equipped laboratories. Also simultaneously labelling of multiple patients is possible.

  5. Final Environmental Impact Statement (EIS) for the Space Nuclear Thermal Propulsion (SNTP) program

    NASA Astrophysics Data System (ADS)

    1991-09-01

    A program has been proposed to develop the technology and demonstrate the feasibility of a high-temperature particle bed reactor (PBR) propulsion system to be used to power an advanced second stage nuclear rocket engine. The purpose of this Final Environmental Impact Statement (FEIS) is to assess the potential environmental impacts of component development and testing, construction of ground test facilities, and ground testing. Major issues and goals of the program include the achievement and control of predicted nuclear power levels; the development of materials that can withstand the extremely high operating temperatures and hydrogen flow environments; and the reliable control of cryogenic hydrogen and hot gaseous hydrogen propellant. The testing process is designed to minimize radiation exposure to the environment. Environmental impact and mitigation planning are included for the following areas of concern: (1) Population and economy; (2) Land use and infrastructure; (3) Noise; (4) Cultural resources; (5) Safety (non-nuclear); (6) Waste; (7) Topography; (8) Geology; (9) Seismic activity; (10) Water resources; (11) Meteorology/Air quality; (12) Biological resources; (13) Radiological normal operations; (14) Radiological accidents; (15) Soils; and (16) Wildlife habitats.

  6. Use of artificial intelligence in supervisory control

    NASA Technical Reports Server (NTRS)

    Cohen, Aaron; Erickson, Jon D.

    1989-01-01

    Viewgraphs describing the design and testing of an intelligent decision support system called OFMspert are presented. In this expert system, knowledge about the human operator is represented through an operator/system model referred to as the OFM (Operator Function Model). OFMspert uses the blackboard model of problem solving to maintain a dynamic representation of operator goals, plans, tasks, and actions given previous operator actions and current system state. Results of an experiment to assess OFMspert's intent inferencing capability are outlined. Finally, the overall design philosophy for an intelligent tutoring system (OFMTutor) for operators of complex dynamic systems is summarized.

  7. Mobilizable RDF/d-RDF burning program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Niemann, K.; Campbell, J.

    1982-03-01

    The Mobilizable RDF/d-RDF Burning Program was conceived to promote the utilization of refuse-derived fuels (RDF) as a supplement to existing fossil fuel sources in industrial-sized boilers. The program explores the design, development, and eventual construction of densified-RDF (d-RDF) for use in boiler combustion testing as a supplement to stoker coal or wood wastes. The equipment would be mounted on trailers and assembled and operated at preselected sites throughout the country where approximately 750 tons of RDF would be produced and test burned in a local boiler. The equipment, to include a transportable RDF boiler metering and feed system, would thenmore » be moved and operated at two to three test sites annually. The program is intended to encourage the construction of permanent resource recovery facilities by involving local waste handling groups in operating the equipment and producing fuel, and potential local fuel users in testing the fuel in their boilers. The Mobilizable Program was developed from two separate tasks. The first task developed the concept behind the program and defined its operational and organizational structure. The second task, a follow-up to the first, was intended principally to finalize test locations, develop equipment designs and specifications, and formalize a management program. This report summarizes the principal findings of both tasks. It identifies the criteria used to identify test locations, outlines the program's management structure, presents design and performance specifications for both the fuel production equipment and boiler fuel feed systems, and provides a detailed evaluation of the parameters involved in burning RDF in industrial-sized boilers. Final conclusions and recommendations identify problem areas encountered in the program, and discuss possible future directions for such a program.« less

  8. Toward next-generation optical networks: a network operator perspective based on experimental tests and economic analysis

    NASA Astrophysics Data System (ADS)

    Xiao, Xiaojun; Du, Chunsheng; Zhou, Rongsheng

    2004-04-01

    As a result of data traffic"s exponential growth, network is currently evolving from fixed circuit switched services to dynamic packet switched services, which has brought unprecedented changes to the existing transport infrastructure. It is generally agreed that automatic switched optical network (ASON) is one of the promising solutions for the next generation optical networks. In this paper, we present the results of our experimental tests and economic analysis on ASON. The intention of this paper is to present our perspective, in terms of evolution strategy toward ASON, on next generation optical networks. It is shown through experimental tests that the performance of current Pre-standard ASON enabled equipments satisfies the basic requirements of network operators and is ready for initial deployment. The results of the economic analysis show that network operators can be benefit from the deployment of ASON from three sides. Firstly, ASON can reduce the CAPEX for network expanding by integrating multiple ADM & DCS into one box. Secondly, ASON can reduce the OPEX for network operation by introducing automatic resource control scheme. Finally, ASON can increase margin revenue by providing new optical network services such as Bandwidth on Demand, optical VPN etc. Finally, the evolution strategy is proposed as our perspective toward next generation optical networks. We hope the evolution strategy introduced may be helpful for the network operators to gracefully migrate their fixed ring based legacy networks to next generation dynamic mesh based network.

  9. Thai-Alberta Co-Operative Assessment Project Concerning Thirty-Two Rural Secondary Schools in the Third National Economic and Social Plan, Thailand (1972-1976). Final Report.

    ERIC Educational Resources Information Center

    Chareonchai, Ruang; And Others

    This extensive assessment project report focuses on the Rural Secondary Schools (RSS) Project in Thailand. The background, design, rationale and objectives of the assessment are described, as are the eight phases of the study: reconnaissance; proposals; basic planning and pre-testing; data collection; analysis; academic review; final report; and…

  10. Antimisting kerosene JT3 engine fuel system integration study

    NASA Technical Reports Server (NTRS)

    Fiorentino, A.

    1987-01-01

    An analytical study and laboratory tests were conducted to assist NASA in determining the safety and mission suitability of the modified fuel system and flight tests for the Full-Scale Transport Controlled Impact Demonstration (CID) program. This twelve-month study reviewed and analyzed both the use of antimisting kerosene (AMK) fuel and the incorporation of a fuel degrader on the operational and performance characteristics of the engines tested. Potential deficiencies and/or failures were identified and approaches to accommodate these deficiencies were recommended to NASA Ames -Dryden Flight Research Facility. The result of flow characterization tests on degraded AMK fuel samples indicated levels of degradation satisfactory for the planned missions of the B-720 aircraft. The operability and performance with the AMK in a ground test engine and in the aircraft engines during the test flights were comparable to those with unmodified Jet A. For the final CID test, the JT-3C-7 engines performed satisfactorily while operating on AMK right up to impact.

  11. International Space Station Alpha trace contaminant control subassembly life test report

    NASA Technical Reports Server (NTRS)

    Tatara, J. D.; Perry, J. L.

    1995-01-01

    The Environmental Control and Life Support System (ECLSS) Life Test Program (ELTP) began with Trace Contaminant Control Subassembly (TCCS) Life Testing on November 9, 1992, at 0745. The purpose of the test, as stated in the NASA document 'Requirements for Trace Contaminant Control Subassembly High Temperature Catalytic Oxidizer Life Testing (Revision A)' was to 'provide for the long duration operation of the ECLSS TCCS HTCO (High Temperature Catalytic Oxidizer) at normal operating conditions... (and thus)... to determine the useful life of ECLSS hardware for use on long duration manned space missions.' Specifically, the test was designed to demonstrate thermal stability of the HTCO catalyst. The report details TCCS stability throughout the test. Graphs are included to aid in evaluating trends and subsystem anomalies. The report summarizes activities through the final day of testing, January 17, 1995 (test day 762).

  12. Application of fuzzy logic-neural network based reinforcement learning to proximity and docking operations: Special approach/docking testcase results

    NASA Technical Reports Server (NTRS)

    Jani, Yashvant

    1993-01-01

    As part of the RICIS project, the reinforcement learning techniques developed at Ames Research Center are being applied to proximity and docking operations using the Shuttle and Solar Maximum Mission (SMM) satellite simulation. In utilizing these fuzzy learning techniques, we use the Approximate Reasoning based Intelligent Control (ARIC) architecture, and so we use these two terms interchangeably to imply the same. This activity is carried out in the Software Technology Laboratory utilizing the Orbital Operations Simulator (OOS) and programming/testing support from other contractor personnel. This report is the final deliverable D4 in our milestones and project activity. It provides the test results for the special testcase of approach/docking scenario for the shuttle and SMM satellite. Based on our experience and analysis with the attitude and translational controllers, we have modified the basic configuration of the reinforcement learning algorithm in ARIC. The shuttle translational controller and its implementation in ARIC is described in our deliverable D3. In order to simulate the final approach and docking operations, we have set-up this special testcase as described in section 2. The ARIC performance results for these operations are discussed in section 3 and conclusions are provided in section 4 along with the summary for the project.

  13. NASA's James Webb Space Telescope Science Instruments Begin Final Super Cold Test at Goddard

    NASA Image and Video Library

    2017-12-08

    At NASA's James Webb Space Telescope's final destination in space, one million miles away from Earth, it will operate at incredibly cold temperatures of -387 degrees Fahrenheit, or 40 degrees Kelvin. This is 260 degrees Fahrenheit colder than any place on the Earth’s surface has ever been. So first, this final super cold test at Goddard will prepare the Integrated Science Instrument Module (ISIM), or the “heart” of the telescope, for space. Read more: go.nasa.gov/1KFPwJG Contamination Control Engineer Alan Abeel conducts final inspections and places contamination foils before the start of the test. Credit: NASA/Goddard/Chris Gunn NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram

  14. History and Benefits of Engine Level Testing Throughout the Space Shuttle Main Engine Program

    NASA Technical Reports Server (NTRS)

    VanHooser, Katherine; Kan, Kenneth; Maddux, Lewis; Runkle, Everett

    2010-01-01

    Rocket engine testing is important throughout a program s life and is essential to the overall success of the program. Space Shuttle Main Engine (SSME) testing can be divided into three phases: development, certification, and operational. Development tests are conducted on the basic design and are used to develop safe start and shutdown transients and to demonstrate mainstage operation. This phase helps form the foundation of the program, demands navigation of a very steep learning curve, and yields results that shape the final engine design. Certification testing involves multiple engine samples and more aggressive test profiles that explore the boundaries of the engine to vehicle interface requirements. The hardware being tested may have evolved slightly from that in the development phase. Operational testing is conducted with mature hardware and includes acceptance testing of flight assets, resolving anomalies that occur in flight, continuing to expand the performance envelope, and implementing design upgrades. This paper will examine these phases of testing and their importance to the SSME program. Examples of tests conducted in each phase will also be presented.

  15. Director, Operational Test and Evaluation

    DTIC Science & Technology

    2007-12-01

    important, and all – collectively – are necessary to properly set requirements, incentivize industry, oversee system design and development, and finally...evaluation planning which defines testing required for all system-level evaluation. • Enable access to all system-level test data by government DT...responsible for sustainment cost estimates, and with the OTAs, to contribute relevant data. As with all new missions, there is a question of resources

  16. Orbital Transfer Vehicle Oxygen Turbopump Technology. Final Report, Volume 1. Design, Fabrication, and Hydrostatic Bearing Testing

    DTIC Science & Technology

    1990-12-01

    Temperature Distance Sensors -. ...................... 188 Start Transient 4.5-7 Distance Sensor Signal as a Function of Speed...189 4.5-8 Distance Sensor Signal as a Function of Speed ......................................... 190 4.5-9 Cryogenic Operation of...Distance Sensors at 72,000 RPM ........................ 192 Steady State 4.5-10 Cryogenic Operation of Distance Sensor Through Start

  17. Moonport: A History of Apollo Launch Facilities and Operations

    NASA Technical Reports Server (NTRS)

    Benson, C. D.; Faherty, W. B.

    1978-01-01

    The development of the Apollo f launch facilities and launch operations is described from the beginning of design through the final launch. Management techniques, innovation in automation, and testing on the ground to avoid failures in space are among the topics covered. The impact of the Apollo program on the citrus groves and quiet beaches of Florida's east coast is included.

  18. Affordable Electro-Magnetic Interference (EMI) Testing on Large Space Vehicles

    NASA Technical Reports Server (NTRS)

    Aldridge, Edward; Curry, Bruce; Scully, Robert

    2015-01-01

    Objective: Perform System-Level EMI testing of the Orion Exploration Flight Test-1 (EFT-1) spacecraft in situ in the Kennedy Space Center's Neil Armstrong Operations & Checkout (O&C) Facility in 6 days. The only way to execute the system-level EMI testing and meet this schedule challenge was to perform the EMI testing in situ in the Final Assembly & System Test (FAST) Cell in a reverberant mode, not the direct illumination mode originally planned. This required the unplanned construction of a Faraday Cage around the vehicle and FAST Cell structure. The presence of massive steel platforms created many challenges to developing an efficient screen room to contain the RF energy and yield an effective reverberant chamber. An initial effectiveness test showed marginal performance, but improvements implemented afterward resulted in the final test performing surprisingly well! The paper will explain the design, the challenges, and the changes that made the difference in performance!

  19. Quiet Clean Short-haul Experimental Engine (QCSEE) Under-The-Wing (UTW) engine composite nacelle test report. Volume 1: Summary, aerodynamic and mechanical performance

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The performance test results of the final under-the-wing engine configuration are presented. One hundred and six hours of engine operation were completed, including mechanical and performance checkout, baseline acoustic testing with a bellmouth inlet, reverse thrust testing, acoustic technology tests, and limited controls testing. The engine includes a variable pitch fan having advanced composite fan blades and using a ball-spline pitch actuation system.

  20. Spark Plug Defects and Tests

    NASA Technical Reports Server (NTRS)

    Silsbee, F B; Loeb, L B; Sawyer, L G; Fonseca, E L; Dickinson, H C; Agnew, P G

    1920-01-01

    The successful operation of the spark plug depends to a large extent on the gas tightness of the plug. Part 1 of this report describes the method used for measuring the gas tightness of aviation spark plugs. Part 2 describes the methods used in testing the electrical conductivity of the insulation material when hot. Part 3 describes the testing of the cold dielectric strength of the insulation material, the resistance to mechanical shock, and the final engine test.

  1. Tropic Testing of Vehicles

    DTIC Science & Technology

    2014-08-27

    kilometer track running through tropical forest . The track is a combination of a bauxite/dirt base with grades on the road up to 20 percent and log...TYPE Final 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Test Operations Procedure (TOP) 02-2-817A Tropic Testing of Vehicles 5a...PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) U.S. Army Yuma Proving Ground Tropic Regions Test Center (TEDT-YPT) 301 C. Street Yuma, AZ

  2. Solar heating and cooling system design and development

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The progress of the program during the sixth program quarter is reported. The program calls for the development and delivery of eight prototype solar heating and cooling systems for installation and operational test. The William O'Brien single-family heating system was installed and is operational. The New Castle single-family heating residence is under construction. The Kansas University (KU) system is in the final design stages. The 25 ton cooling subsystem for KU is the debugging stage. Pressure drops that were greater than anticipated were encountered. The 3 ton simulation work is being finalized and the design parameters for the Rankine system were determined from simulation output.

  3. The Thirty Meter Telescope site testing robotic computer system

    NASA Astrophysics Data System (ADS)

    Riddle, Reed L.; Schöck, Matthias; Skidmore, Warren

    2006-06-01

    The Thirty Meter Telescope (TMT) project is currently testing six remote sites as candidates for the final location of the telescope. Each site has several instruments, including seeing monitors, weather stations, and turbulence profile measuring systems, each of which is computer controlled. As the sites are remote (usually hours from the nearest town), they requires a system that can control the operations of all the varied subsystems, keep the systems safe from damage and recover from errors during operation. The robotic system must also be robust enough to operate without human intervention and when internet connections are lost. It is also critical that a data archiving system diligently records all data as gathered. This paper is a discussion of the TMT site testing robotic computer system as implemented.

  4. EPIC : expedited processing at international crossings : evaluation final report

    DOT National Transportation Integrated Search

    1998-09-01

    This executive summary presents an overview of the Expedited Processing at International Crossings (EPIC) Field Operational Test (FOT). The EPIC focus was on the commercial vehicle transport component of international border crossings at the Nogales,...

  5. U.S. Coast Guard, Office of Boating Safety

    MedlinePlus

    ... COAST GUARD ISSUES FINALE RULE – UPDATE OF OUTBOARD ENGINE WEIGHT TEST REQUIREMENTS FY18 National Nonprofit Organization Funding ... operator, passenger, or concerned individual, can make a difference. Manufacturers Is your boat safe? You can check ...

  6. Adaptive Urban Signal Control and Integration (AUSCI) : evaluation final report

    DOT National Transportation Integrated Search

    2000-10-01

    This report presents an evaluation of the Adaptive Urban Signal Control and Integration (AUSCI) Intelligent Transportation System (ITS) Field Operational Test in Minneapolis, Minnesota. The project involved a 56-intersection portion of Minneapolis, e...

  7. SMART operational field test evaluation : schedule adherence report : final report

    DOT National Transportation Integrated Search

    1997-06-01

    Among the paratransit (termed Community Transit within SMART) performance indicators likely to be affected by SMARTs implementation of automated scheduling and dispatch (ASD) is schedule adherence. Schedule adherence refers to a variety of measure...

  8. Columbus electronic freight management evaluation final report : June 2008.

    DOT National Transportation Integrated Search

    2008-06-01

    This document provides the independent evaluation of the USDOT-sponsored Columbus Electronic Freight Management (CEFM) Operational Test, which occurred from late May 2007 until December 2007. The Evaluation report includes descriptions of the CEFM sy...

  9. Preliminary test Results for a 25K Sorption Cryocooler Designed for the UCSB Long Duration Balloon Cosmic Microwave Background Radiation Experiment

    NASA Technical Reports Server (NTRS)

    Wade, L. A.; Levy, A. R.

    1996-01-01

    A continuous operation, vibration-free, long-life 25K sorption cryocooler has been built and is now in final integration and performance testing. This cooler wil be flown on the University of California at Santa Barbara (UCSB) Long Duration Balloon (LDB) Cosmic Microwave Background Radiation Experiment.

  10. Design, Construction, and Test of a 473 MHZ Four - Cavity Rfq.

    NASA Astrophysics Data System (ADS)

    Kazimi, Reza

    1992-01-01

    An RFQ accelerator using the new four-rod cavity design has been fabricated and successfully tested at Texas Accelerator Center. The RFQ is designed to accelerate a 10 mA H^- ion beam from 30 keV to 500 keV with the operating frequency of 473 MHz. This new type of RFQ structure not only promises simplicity of design, construction, and operation, but also can be manufactured to operate at higher frequencies than previously achieved by other four-rod type RFQs. Combination of simplicity and compactness due to higher operating frequencies (400 to 500 MHz) makes the design desirable for injector of proton accelerators, medical linear accelerators, and variety of other applications. This dissertation presents the steps I went through in inventing, developing, and experimentally testing this new RFQ design. First an introduction to accelerators is given, and the basic accelerator physics terminologies are defined. The principles of operations of the RFQs are described, and the theory behind new type of RFQ structure is explained. Then the beam dynamics and cavity design of the RFQ are presented. Finally, the mechanical design and construction procedure are discussed, and experimental results of rf tests and actual H ^- beam test are given.

  11. High Pressure Reverse Flow APS Engine

    NASA Technical Reports Server (NTRS)

    Senneff, J. M.

    1972-01-01

    A design and test demonstration effort was undertaken to evaluate the concept of the reverse flow engine for the APS engine application. The 1500 lb (6672 N) thrust engine was designed to operate on gaseous hydrogen and gaseous oxygen propellants at a mixture ratio of 4 and to achieve the objective performance of 435 sec (4266 Nsec/kg) specific impulse. Superimposed durability requirements called for a million-cycle capability with 50 hours duration. The program was undertaken as a series of tasks including the initial preliminary design, design of critical test components and finally, the design and demonstration of an altitude engine which could be used interchangeably to examine operating parameters as well as to demonstrate the capability of the concept. The program results are reported with data to indicate that all of the program objectives were met or exceeded within the course of testing on the program. The analysis effort undertaken is also reported in detail and supplemented with test data in some cases where prior definitions could not be made. The results are contained of these analyses as well as the test results conducted throughout the course of the program. Finally, the test data and analytical results were combined to allow recommendations for a flight weight design. This preliminary design effort is also detailed.

  12. Design and prototype fabrication of a 30 tesla cryogenic magnet

    NASA Technical Reports Server (NTRS)

    Prok, G. M.; Swanson, M. C.; Brown, G. V.

    1977-01-01

    A liquid-neon-cooled magnet has been designed to produce 30 teslas in steady operation. Its feasibility was established by a previously reported parametric study. To ensure the correctness of the heat transfer relationships used, supercritical neon heat transfer tests were made. Other tests made before the final design included tests on the effect of the magnetic field on pump motors; tensile-shear tests on the cryogenic adhesives; and simulated flow studies for the coolant. The magnet will be made of two pairs of coils, cooled by forced convection of supercritical neon. Heat from the supercritical neon will be rejected through heat exchangers which are made of roll-bonded copper panels and are submerged in a pool of saturated liquid neon. A partial mock-up coil was wound to identify the tooling required to wind the magnet. This was followed by winding a prototype pair of coils. The prototype winding established procedures for fabricating the final magnet and revealed slight changes needed in the final design.

  13. Cleanliness verification process at Martin Marietta Astronautics

    NASA Astrophysics Data System (ADS)

    King, Elizabeth A.; Giordano, Thomas J.

    1994-06-01

    The Montreal Protocol and the 1990 Clean Air Act Amendments mandate CFC-113, other chlorinated fluorocarbons (CFC's) and 1,1,1-Trichloroethane (TCA) be banned from production after December 31, 1995. In response to increasing pressures, the Air Force has formulated policy that prohibits purchase of these solvents for Air Force use after April 1, 1994. In response to the Air Force policy, Martin Marietta Astronautics is in the process of eliminating all CFC's and TCA from use at the Engineering Propulsion Laboratory (EPL), located on Air Force property PJKS. Gross and precision cleaning operations are currently performed on spacecraft components at EPL. The final step of the operation is a rinse with a solvent, typically CFC-113. This solvent is then analyzed for nonvolatile residue (NVR), particle count and total filterable solids (TFS) to determine cleanliness of the parts. The CFC-113 used in this process must be replaced in response to the above policies. Martin Marietta Astronautics, under contract to the Air Force, is currently evaluating and testing alternatives for a cleanliness verification solvent. Completion of test is scheduled for May, 1994. Evaluation of the alternative solvents follows a three step approach. This first is initial testing of solvents picked from literature searches and analysis. The second step is detailed testing of the top candidates from the initial test phase. The final step is implementation and validation of the chosen alternative(s). Testing will include contaminant removal, nonvolatile residue, material compatibility and propellant compatibility. Typical materials and contaminants will be tested with a wide range of solvents. Final results of the three steps will be presented as well as the implementation plan for solvent replacement.

  14. SMART operational field test evaluation : institutional issues report : final report

    DOT National Transportation Integrated Search

    1997-06-01

    Implementation of Intelligent Transportation Systems (ITS) in Southeastern Michigan offers an opportunity to enhance public transit and increase regional mobility. However, the needs that ITS technology will be designed to meet, and the manner in whi...

  15. Oregon Green Light CVO evaluation : final report : executive summary

    DOT National Transportation Integrated Search

    2001-04-01

    This report summarizes the findings of all of the Detailed Test Plans conducted for the evaluation of the Oregon Green Light Commercial Vehicle Operations (CVO) project. This project was responsible for the installation of 21 systems containing weigh...

  16. Trilogy : operational test : final report

    DOT National Transportation Integrated Search

    1998-09-29

    The Trilogy project was an ITS demonstration of the broadcast of freeway system traveler information to both commercial and commuter drivers over a 25-mile (40.3 km) radius of the Twin Cities metropolitan area. In this project, real-time freeway syst...

  17. Site selection for MSFC operational tests of solar heating and cooling systems

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The criteria, methodology, and sequence aspects of the site selection process are presented. This report organized the logical thought process that should be applied to the site selection process, but final decisions are highly selective.

  18. Fuel conservation evaluation of US Army helicopters. Part 5. Ah-1S flight testing. Final report, 31 July-21 September 1982

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Todd, L.L.; Savage, R.T.; Vincent, R.L.

    1983-01-01

    The United States Army Aviation Engineering Flight Activity conducted level flight performance tests of the AH-1S (Prod) helicopter to provide data to determine the most fuel efficient operating conditions. Hot and cold weather test sites were used to extend the range of the advancing tip Mach number data to supplement existing AH-1S performance data. Preliminary analysis of non-dimensional data identifies the effects of compressibility on performance and shows a power penalty of as much as 6% at a high NR/theta. The power required characteristics determined by these tests can be combined with engine performance to determine the most fuel efficientmore » operating conditions.« less

  19. UNIX-based operating systems robustness evaluation

    NASA Technical Reports Server (NTRS)

    Chang, Yu-Ming

    1996-01-01

    Robust operating systems are required for reliable computing. Techniques for robustness evaluation of operating systems not only enhance the understanding of the reliability of computer systems, but also provide valuable feed- back to system designers. This thesis presents results from robustness evaluation experiments on five UNIX-based operating systems, which include Digital Equipment's OSF/l, Hewlett Packard's HP-UX, Sun Microsystems' Solaris and SunOS, and Silicon Graphics' IRIX. Three sets of experiments were performed. The methodology for evaluation tested (1) the exception handling mechanism, (2) system resource management, and (3) system capacity under high workload stress. An exception generator was used to evaluate the exception handling mechanism of the operating systems. Results included exit status of the exception generator and the system state. Resource management techniques used by individual operating systems were tested using programs designed to usurp system resources such as physical memory and process slots. Finally, the workload stress testing evaluated the effect of the workload on system performance by running a synthetic workload and recording the response time of local and remote user requests. Moderate to severe performance degradations were observed on the systems under stress.

  20. Operations Nougat and Whetstone events: Hard Hat, Danny Boy, Marshmallow, Mudpack, Wishbone, Gumdrop, Diluted Waters, and Tiny Tot, 15 February 1962-17 June 1965. Final report 15 Feb 62-19 Jun 68

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brady, W.J.; Horton, K.K.; Eubank, B.F.

    1984-01-31

    This report is a personnel oriented history of DOD participation in underground nuclear weapons testing during Operations NOUGAT and WHETSTONE, test events HARD HAT, DANNY BOY, MARSHMALLOW, MUDPACK, WISHBONE, GUMDROP, DILUTED WATERS, and TINY TOT. It is the first in a series of historical reports which will include all DOD underground nuclear weapons tests and DOE underground nuclear weapons tests with significant DOD participation from 1962 forward. In addition to these volumes presenting a history of the underground nuclear test program, a later restricted volume will identify all DOD participants, (military, civilian, and their contractors) and will list their dosimetrymore » data.« less

  1. Electrical characterization of a Space Station Freedom alpha utility transfer assembly

    NASA Technical Reports Server (NTRS)

    Yenni, Edward J.

    1994-01-01

    Electrical power, command signals and data are transferred across the Space Station Freedom solar alpha rotary joint by roll rings, which are incorporated within the Utility Transfer Assembly (UTA) designed and manufactured by Honeywell Space Systems Operations. A developmental Model of the UTA was tested at the NASA Lewis Research Center using the Power Management and Distribution DC test bed. The objectives of these tests were to obtain data for calibrating system models and to support final design of qualification and flight units. This testing marked the first time the UTA was operated at high power levels and exposed to electrical conditions similar to that which it will encounter on the actual Space Station. Satisfactory UTA system performance was demonstrated within the scope of this testing.

  2. Predictive factors for postoperative visual function of primary chronic rhegmatogenous retinal detachment after scleral buckling.

    PubMed

    Fang, Wei; Li, Jiu-Ke; Jin, Xiao-Hong; Dai, Yuan-Min; Li, Yu-Min

    2016-01-01

    To evaluate predictive factors for postoperative visual function of primary chronic rhegmatgenous retinal detachment (RRD) after sclera buckling (SB). Totally 48 patients (51 eyes) with primary chronic RRD were included in this prospective interventional clinical cases study, which underwent SB alone from June 2008 to December 2014. Age, sex, symptoms duration, detached extension, retinal hole position, size, type, fovea on/off, proliferative vitreoretinopathy (PVR), posterior vitreous detachment (PVD), baseline best corrected visual acuity (BCVA), operative duration, follow up duration, final BCVA were measured. Pearson correlation analysis, Spearman correlation analysis and multivariate linear stepwise regression were used to confirm predictive factors for better final visual acuity. Student's t-test, Wilcoxon two-sample test, Chi-square test and logistic stepwise regression were used to confirm predictive factors for better vision improvement. Baseline BCVA was 0.8313±0.6911 logMAR and final BCVA was 0.4761±0.4956 logMAR. Primary surgical success rate was 92.16% (47/51). Correlation analyses revealed shorter symptoms duration (r=0.3850, P=0.0053), less detached area (r=0.5489, P<0.0001), fovea (r=0.4605, P=0.0007), no PVR (r=0.3138, P=0.0250), better baseline BCVA (r=0.7291, P<0.0001), shorter operative duration (r=0.3233, P=0.0207) and longer follow up (r=-0.3358, P=0.0160) were related with better final BCVA, while independent predictive factors were better baseline BCVA [partial R-square (PR(2))=0.5316, P<0.0001], shorter symptoms duration (PR(2)=0.0609, P=0.0101), longer follow up duration (PR(2)=0.0278, P=0.0477) and shorter operative duration (PR(2)=0.0338, P=0.0350). Patients with vision improvement took up 49.02% (25/51). Univariate and multivariate analyses both revealed predictive factors for better vision improvement were better baseline vision [odds ratio (OR) =50.369, P=0.0041] and longer follow up duration (OR=1.144, P=0.0067). Independent predictive factors for better visual outcome of primary chronic RRD after SB are better baseline BCVA, shorter symptoms duration, shorter operative duration and longer follow up duration, while independent predictive factors for better vision improvement after operation are better baseline vision and longer follow up duration.

  3. The Very Specific Vortex Shedding Test on VEGA Launch Vehicle

    NASA Astrophysics Data System (ADS)

    Leofanti, Jose Luis; Fotio, Domenico; Grillenbeck, Anton; Dillinger, Stephan; Scaccia, Aldo

    2012-07-01

    When tall structures are subjected to lateral wind flow, under certain conditions, vortices are shed from alternate sides of the structure inducing periodic cross wind loads on the structure. The periodic loads, in a relatively narrow and stable frequency band, can couple with the structure’s natural frequencies. To avoid this effect the VEGA Launch System (LS) comprised a decoupling device at the launch vehicle (LV) base called Anti Vortex Shedding (AVS). During the LV-Ground Segment combined test campaign in Kourou, the LV mounted on AVS was experimentally verified, including a modal characterization test, a verification under artificial operational loads and finally tested under real wind environment. The paper gives an overview on the particular aspects of test planning, the test setup preparation inside the launch pad gantry, the test performance, test results and the conclusion for the VEGA launch system’s operational readiness.

  4. Langley 8-foot high-temperature tunnel oxygen measurement system

    NASA Technical Reports Server (NTRS)

    Sprinkle, Danny R.; Chen, Tony D.; Chaturvedi, Sushil K.

    1991-01-01

    In order to ensure that there is a proper amount of oxygen necessary for sustaining test engine operation for hypersonic propulsion systems testing at the NASA Langley 8-foot high-temperature tunnel, a quickly responding real-time measurement system of test section oxygen concentration has been designed and tested at Langley. It is built around a zirconium oxide-based sensor which develops a voltage proportional to the oxygen partial pressure of the test gas. The voltage signal is used to control the amount of oxygen being injected into the combustor air. The physical operation of the oxygen sensor is described, as well as the sampling system used to extract the test gas from the tunnel test section. Results of laboratory tests conducted to verify sensor accuracy and response time performance are discussed, as well as the final configuration of the system to be installed in the tunnel.

  5. Final Report, January 1991 - July 1992

    NASA Astrophysics Data System (ADS)

    Ferrara, Jon

    1992-07-01

    This report covers final schedules, expenses and billings, monthly reports, testing, and deliveries for this contract. The goal of the detector development program for the Solar and Heliospheric Spacecraft (SOHO) EUV Imaging Telescope (EIT) is an Extreme UltraViolet (EUV) CCD (Change Collecting Device) camera. As a part of the CCD screening effort, the quantum efficiency (QE) of a prototype CCD has been measured in the NRL EUV laboratory over the wavelength range of 256 to 735 Angstroms. A simplified model has been applied to these QE measurements to illustrate the relevant physical processes that determine the performance of the detector. The charge transfer efficiency (CTE) characteristics of the Tektronix 1024 X 1024 CCD being developed for STIS/SOHO space imaging applications have been characterized at different signal levels, operating conditions, and temperatures using a variety of test methods. A number of CCD's have been manufactured using processing techniques developed to improve CTE, and test results on these devices will be used in determining the final chip design. In this paper, we discuss the CTE test methods used and present the results and conclusions of these tests.

  6. Cassini's Test Methodology for Flight Software Verification and Operations

    NASA Technical Reports Server (NTRS)

    Wang, Eric; Brown, Jay

    2007-01-01

    The Cassini spacecraft was launched on 15 October 1997 on a Titan IV-B launch vehicle. The spacecraft is comprised of various subsystems, including the Attitude and Articulation Control Subsystem (AACS). The AACS Flight Software (FSW) and its development has been an ongoing effort, from the design, development and finally operations. As planned, major modifications to certain FSW functions were designed, tested, verified and uploaded during the cruise phase of the mission. Each flight software upload involved extensive verification testing. A standardized FSW testing methodology was used to verify the integrity of the flight software. This paper summarizes the flight software testing methodology used for verifying FSW from pre-launch through the prime mission, with an emphasis on flight experience testing during the first 2.5 years of the prime mission (July 2004 through January 2007).

  7. A Fire Safety Certification System for Board and Care Operators and Staff. SBIR Phase II: Final Report.

    ERIC Educational Resources Information Center

    Walker, Bonnie L.

    This report describes Phase II of a project which developed a system for delivering fire safety training to board and care providers who serve adults with developmental disabilities. Phase II focused on developing and pilot testing a "train the trainers" workshop for instructors and field testing the provider's workshop. Evaluation of…

  8. Revised Planning Methodology For Signalized Intersections And Operational Analysis Of Exclusive Left-Turn Lanes, Part-II: Models And Procedures (Final Report)

    DOT National Transportation Integrated Search

    1996-04-01

    THIS REPORT ALSO DESCRIBES THE PROCEDURES FOR DIRECT ESTIMATION OF INTERSECTION CAPACITY WITH SIMULATION, INCLUDING A SET OF RIGOROUS STATISTICAL TESTS FOR SIMULATION PARAMETER CALIBRATION FROM FIELD DATA.

  9. Knowledge-Based Runway Assignment for Arrival Aircraft in the Terminal Area

    DOT National Transportation Integrated Search

    1997-01-01

    A knowledge-based system for scheduling arrival traffic in the terminal area, : referred to as the Final Approach Spacing Tool (FAST), has been implemented and : operationally tested at the Dallas/Fort Worth Terminal Radar Approach Control : (TRACON)...

  10. A high school is supplied with solar energy--Dallas, Texas

    NASA Technical Reports Server (NTRS)

    1981-01-01

    System preheats 100 percent of domestic hot water and supplies almost half of heating requirements for three story, concrete frame, brick building with basement. Final report includes details of installation, operation and maintenance, contract negotiation, and acceptance test plan.

  11. Final report : mobile surveillance and wireless communication systems field operational test. Volume 1, Executive summary

    DOT National Transportation Integrated Search

    1999-03-01

    This study focused on assessing the application of traffic monitoring and management systems which use transportable surveillance and ramp meter trailers, video image processors, and wireless communications. The mobile surveillance and wireless commu...

  12. Evaluation of Acadia National Park ITS field operational test : final report

    DOT National Transportation Integrated Search

    2003-06-01

    This report presents an assessment of the effectiveness of intelligent transportation system (ITS) technologies in addressing the transportation problems within the setting of a National Park. Acadia National Park on the Mount Desert Island in the St...

  13. 10-decade wide-range neutron-monitoring system. Final test report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Green, W.K.

    The objective of Project Agreement 49 was to design, fabricate, test, and evaluate under actual nuclear reactor operating conditions, one prototype counting-Campbelling wide-range type thermal neutron flux measurement channel. This report describes the basic system designed for PA 49, and describes and presents the results of tests conducted on the system. Individual module descriptions and schematics are contained in the instruction manual which was issued with the system.

  14. Computer modeling of heat pipe performance

    NASA Technical Reports Server (NTRS)

    Peterson, G. P.

    1983-01-01

    A parametric study of the defining equations which govern the steady state operational characteristics of the Grumman monogroove dual passage heat pipe is presented. These defining equations are combined to develop a mathematical model which describes and predicts the operational and performance capabilities of a specific heat pipe given the necessary physical characteristics and working fluid. Included is a brief review of the current literature, a discussion of the governing equations, and a description of both the mathematical and computer model. Final results of preliminary test runs of the model are presented and compared with experimental tests on actual prototypes.

  15. A FEASIBILITY STUDY TO INVESTIGATE THE INSTRUMENTATION, ESTABLISHMENT, AND OPERATION OF A LEARNING LABORATORY FOR HARD-OF-HEARING CHILDREN, FINAL REPORT.

    ERIC Educational Resources Information Center

    STEPP, ROBERT E.

    TEN CHILDREN AGED 5-8 WERE SELECTED TO TEST A SELF-INSTRUCTIONAL, SELF-OPERATING SYSTEM TO DEVELOP LIPREADING SKILLS. THEIR HEARING DEFICIENCY RANGED FROM HARD OF HEARING TO PROFOUNDLY DEAF. THE SYSTEM CONSISTED OF THREE STUDY CARRELS, AN 8-MM CARTRIDGE-LOADING SOUND MOTION PICTURE PROJECTOR, AND AN OBSERVATION BOOTH UTILIZING A ONE-WAY MIRROR.…

  16. Reusability aspects for space transportation rocket engines: programmatic status and outlook

    NASA Astrophysics Data System (ADS)

    Preclik, D.; Strunz, R.; Hagemann, G.; Langel, G.

    2011-09-01

    Rocket propulsion systems belong to the most critical subsystems of a space launch vehicle, being illustrated in this paper by comparing different types of transportation systems. The aspect of reusability is firstly discussed for the space shuttle main engine, the only rocket engine in the world that has demonstrated multiple reuses. Initial projections are contrasted against final reusability achievements summarizing three decades of operating the space shuttle main engine. The discussion is then extended to engines employed on expendable launch vehicles with an operational life requirement typically specifying structural integrities up to 20 cycles (start-ups) and an accumulated burning time of about 6,000 s (Vulcain engine family). Today, this life potential substantially exceeds the duty cycle of an expendable engine. It is actually exploited only during the development and qualification phase of an engine when system reliability is demonstrated on ground test facilities with a reduced number of hardware sets that are subjected to an extended number of test cycles and operation time. The paper will finally evaluate the logic and effort necessary to qualify a reusable engine for a required reliability and put this result in context of possible cost savings realized from reuse operations over a time span of 25 years.

  17. Draft Supplement to Final Environmental Statement on Continental United States (CONUS) Over-the-Horizon Backscatter (OTH-B) Radar System, Penobscot, Washington, Somerset Counties, Maine.

    DTIC Science & Technology

    1981-08-01

    by psychological tests and EEG recordings. No statistically significant differences between the two groups were found. In our opinion, the lack of...phenomena. A jet engine test facility is located immediately south of the site. Engines are tested at the facility approximately 20 times a year. The...duration of each test is approximately 68 minutes. Noise monitoring data for operation of this facility are not available; however, it is clear that

  18. Saturn Apollo Program

    NASA Image and Video Library

    1967-01-01

    This photograph is a view of the Saturn V S-IC (first) test stage being hoisted into the S-IC-B1 test stand at the Mississippi Test Facility (MTF), Bay St. Louis, Mississippi. This stage was used to prove the operational readiness of the stand. Begirning operations in 1966, the MTF has two test stands; a dual-position structure for running the S-IC stage at full throttle, and two separate stands for the S-II (Saturn V third) stage. It became the focus of the static test firing program. The completed S-IC stage was shipped from the Michoud Assembly Facility (MAF) to the MTF. The stage was then installed into the 124-meter-high test stand for static firing tests before shipment to the Kennedy Space Center for final assembly of the Saturn V vehicle. The MTF was renamed to the National Space Technology Laboratory (NSTL) in 1974 and later to the Stennis Space Center (SSC) in May 1988.

  19. Durability testing at 5 atmospheres of advanced catalysts and catalyst supports for gas turbine engine combustors

    NASA Technical Reports Server (NTRS)

    Olson, B. A.; Lee, H. C.; Osgerby, I. T.; Heck, R. M.; Hess, H.

    1980-01-01

    The durability of CATCOM catalysts and catalyst supports was experimentally demonstrated in a combustion environment under simulated gas turbine engine combustor operating conditions. A test of 1000 hours duration was completed with one catalyst using no. 2 diesel fuel and operating at catalytically-supported thermal combustion conditions. The performance of the catalyst was determined by monitoring emissions throughout the test, and by examining the physical condition of the catalyst core at the conclusion of the test. Tests were performed periodically to determine changes in catalytic activity of the catalyst core. Detailed parametric studies were also run at the beginning and end of the durability test, using no. 2 fuel oil. Initial and final emissions for the 1000 hours test respectively were: unburned hydrocarbons (C3 vppm):0, 146, carbon monoxide (vppm):30, 2420; nitrogen oxides (vppm):5.7, 5.6.

  20. Site operator program final report for fiscal years 1992 through 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Francfort, J.E.; Bassett, R.R.; Birasco, S.

    The Site Operator Program was an electric vehicle testing and evaluation program sponsored by US Department of Energy and managed at the Idaho National Engineering and Environmental Laboratory. The Program`s goals included the field evaluation of electric vehicles in real-world applications and environments; the support of electric vehicle technology advancement; the development of infrastructure elements necessary to support significant electric vehicle use; and increasing the awareness and acceptance of electric vehicles. This report covers Program activities from 1992 to 1996. The Site Operator Program ended in September 1996, when it was superseded by the Field Operations Program. Electric vehicle testingmore » included baseline performance testing, which was performed in conjunction with EV America. The baseline performance parameters included acceleration, braking, range, energy efficiency, and charging time. The Program collected fleet operations data on electric vehicles operated by the Program`s thirteen partners, comprising electric utilities, universities, and federal agencies. The Program`s partners had over 250 electric vehicles, from vehicle converters and original equipment manufacturers, in their operating fleets. Test results are available via the World Wide Web site at http://ev.inel.gov/sop.« less

  1. Cross cultural translation and adaptation to Brazilian Portuguese of the Hearing Implant Sound Quality Index Questionnaire - (HISQUI19).

    PubMed

    Caporali, Priscila Faissola; Caporali, Sueli Aparecida; Bucuvic, Érika Cristina; Vieira, Sheila de Souza; Santos, Zeila Maria; Chiari, Brasília Maria

    2016-01-01

    Translation and cross-cultural adaptation of the instrument Hearing Implant Sound Quality Index (HISQUI19), and characterization of the target population and auditory performance in Cochlear Implant (CI) users through the application of a synthesis version of this tool. Evaluations of conceptual, item, semantic and operational equivalences were performed. The synthesis version was applied as a pre-test to 33 individuals, whose final results characterized the final sample and performance of the questionnaire. The results were analyzed statistically. The final translation (FT) was back-translated and compared with the original version, revealing a minimum difference between items. The changes observed between the FT and the synthesis version were characterized by the application of simplified vocabulary used on a daily basis. For the pre-test, the average score of the interviewees was 90.2, and a high level of reliability was achieved (0.83). The translation and cross-cultural adaptation of the HISQUI19 questionnaire showed suitability for conceptual, item, semantic and operational equivalences. For the sample characterization, the sound quality was classified as good with better performance for the categories of location and distinction of sound/voices.

  2. Development of Live-working Robot for Power Transmission Lines

    NASA Astrophysics Data System (ADS)

    Yan, Yu; Liu, Xiaqing; Ren, Chengxian; Li, Jinliang; Li, Hui

    2017-07-01

    Dream-I, the first reconfigurable live-working robot for power transmission lines successfully developed in China, has the functions of autonomous walking on lines and accurately positioning. This paper firstly described operation task and object of the robot; then designed a general platform, an insulator replacement end and a drainage plate bolt fastening end of the robot, presented a control system of the robot, and performed simulation analysis on operation plan of the robot; and finally completed electrical field withstand voltage tests in a high voltage hall as well as online test and trial on actual lines. Experimental results show that by replacing ends of manipulators, the robot can fulfill operation tasks of live replacement of suspension insulators and live drainage plate bolt fastening.

  3. Stirling Space Engine Program. Volume 2; Appendixes A, B, C and D

    NASA Technical Reports Server (NTRS)

    Dhar, Manmohan

    1999-01-01

    The objective of this program was to develop the technology necessary for operating Stirling power converters in a space environment and to demonstrate this technology in full-scale engine tests. Volume 2 of the report includes the following appendices: Appendix A: Heater Head Development (Starfish Heater Head Program, 1/10th Segment and Full-Scale Heat Pipes, and Sodium Filling and Processing); Appendix B: Component Test Power Converter (CTPC) Component Development (High-temperature Organic Materials, Heat Exchanger Fabrication, Beryllium Issues, Sodium Issues, Wear Couple Tests, Pressure Boundary Penetrations, Heating System Heaters, and Cooler Flow Test); Appendix C: Udimet Testing (Selection of the Reference Material for the Space Stirling Engine Heater Head, Udimet 720LI Creep Test Result Update, Final Summary of Space Stirling Endurance Engine Udimet 720L1 Fatigue Testing Results, Udimet 720l1 Weld Development Summary, and Udimet 720L1 Creep Test Final Results Summary), and Appendix D: CTPC Component Development Photos.

  4. Hazardous materials safety and security technology field operational test. Volume II, evaluation final report synthesis

    DOT National Transportation Integrated Search

    2004-11-11

    The catastrophic events of September 11, 2001 and the ongoing war on terrorism have heightened the level of concern from Federal government officials and the transportation industry regarding the secure transport of hazardous materials (HAZMAT). Secu...

  5. Field test of monitoring of urban vehicle operations using non-intrusive technologies : final report

    DOT National Transportation Integrated Search

    2000-01-01

    This document describes institutional issues associated with the retiming of traffic signals along the Scottsdale/Rural Road Corridor in Scottsdale and Tempe, Arizona in order to provide for coordinated traffic signal control in both jurisdictions. A...

  6. Shared Resources: Sharing Right-Of-Way For Telecommunications, Identification, Review And Analysis Of Legal And Institutional Issues, Final Report

    DOT National Transportation Integrated Search

    1998-09-01

    Commercial Vehicle Administrative (CVO) Processes Cross-Cutting report summarizes and interprets the results of several Field Operational Tests (FOTs) conducted to evaluate systems that increase the efficiency of commercial vehicle administrative pro...

  7. Assessment of a drowsy driver warning system for heavy-vehicle drivers : final report

    DOT National Transportation Integrated Search

    2009-04-01

    Drowsiness has a globally negative impact on performance, slowing reaction time, decreasing situational awareness, and impairing judgment. A field operational test of an early prototype Drowsy Driver Warning System was conducted as a result of 12 yea...

  8. 78 FR 7465 - Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-01

    ..., and applicants for facility (i.e., nuclear power and non-power research and test reactor) operating... the final supporting statement, at the NRC's Public Document Room, Room O-1F21, One White Flint North...

  9. Dogs' Body Language Relevant to Learning Achievement.

    PubMed

    Hasegawa, Masashi; Ohtani, Nobuyo; Ohta, Mitsuaki

    2014-02-27

    The facial expressions and body postures of dogs can give helpful information about their moods and emotional states. People can more effectively obedience train their dogs if we can identify the mannerisms associated with learning in dogs. The aim of this study was to clarify the dog's body language during operant conditioning to predict achievement in the test that followed by measuring the duration of behaviors. Forty-six untrained dogs (17 males and 26 females) of various breeds were used. Each session consisted of 5 minutes of training with a treat reward followed by 3 minutes of rest and finally an operant conditioning test that consisted of 20 "hand motion" cues. The operant tests were conducted a total of nine times over three consecutive days, and the success numbers were counted. The duration of the dog's behavior, focusing on the dog's eyes, mouth, ears, tail and tail-wagging, was recorded during the operant conditioning sessions before the test. Particular behaviors, including wide-eyes, closed mouth, erect ears, and forward and high tail carriage, without wagging or with short and quick wagging, related to high achievement results. It is concluded that dogs' body language during operant conditioning was related to their success rate.

  10. Evaluation of coated columbium alloy heat shields for space shuttle thermal protection system application. Final report. [For us to 2400F

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Black, W.E.

    1977-04-01

    A three-phase program to develop and demonstrate the feasibility of a metallic heat shield suitable for use on Space Shuttle Orbiter class vehicles at operating surface temperatures of up to 1590 K (2400 F) is summarized. An orderly progression of configuration studies, material screening tests, and subscale structural tests was performed. Scale-up feasibility was demonstrated in the final phase when a sizable nine-panel array was fabricated and successfully tested. The full-scale tests included cyclic testing at reduced air pressure to 1590 K (2400 F) and up to 158 dB overall sound pressure level. The selected structural configuration and design techniquesmore » succesfully eliminated thermal induced failures. The thermal/structural performance of the system was repeatedly demonstrated. Practical and effective field repair methods for coated columbium alloys were demonstrated. Major uncertainties of accessibility, refurbishability, and durability were eliminated.« less

  11. LONG-TERM PERFORMANCE OF SOLID OXIDE STACKS WITH ELECTRODE-SUPPORTED CELLS OPERATING IN THE STEAM ELECTROLYSIS MODE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J. E. O'Brien; R. C. O'Brien; X. Zhang

    2011-11-01

    Performance characterization and durability testing have been completed on two five-cell high-temperature electrolysis stacks constructed with advanced cell and stack technologies. The solid oxide cells incorporate a negative-electrode-supported multi-layer design with nickel-zirconia cermet negative electrodes, thin-film yttria-stabilized zirconia electrolytes, and multi-layer lanthanum ferrite-based positive electrodes. The per-cell active area is 100 cm2. The stack is internally manifolded with compliant mica-glass seals. Treated metallic interconnects with integral flow channels separate the cells. Stack compression is accomplished by means of a custom spring-loaded test fixture. Initial stack performance characterization was determined through a series of DC potential sweeps in both fuel cellmore » and electrolysis modes of operation. Results of these sweeps indicated very good initial performance, with area-specific resistance values less than 0.5 ?.cm2. Long-term durability testing was performed with A test duration of 1000 hours. Overall performance degradation was less than 10% over the 1000-hour period. Final stack performance characterization was again determined by a series of DC potential sweeps at the same flow conditions as the initial sweeps in both electrolysis and fuel cell modes of operation. A final sweep in the fuel cell mode indicated a power density of 0.356 W/cm2, with average per-cell voltage of 0.71 V at a current of 50 A.« less

  12. Wake-Sleep Cycle Management during SUSOPS and CONOPS in French Military Forces: Policy and Ethics

    DTIC Science & Technology

    2009-10-01

    sleepiness for 48 hours. Finally, Z- hypnotics are also allowed to promote pre- planned sleep episodes. Nevertheless, the use of these drugs acting on...Finally, Z- hypnotics are also allowed to promote pre- planned sleep episodes. Nevertheless, the use of these drugs acting on the central nervous system...why the individual test of tolerance, planned in the MD instruction, seems to be particularly important for modafinil before operational use. 3.2

  13. Final analysis and design of a thermal protection system for 8-foot HTST combustor

    NASA Technical Reports Server (NTRS)

    Moskowitz, S.

    1973-01-01

    The cylindrical shell combustor with T-bar supports in the 8-foot HTST at the NASA-Langley Research Center encountered vibratory fatigue cracking over a period of 50-250 tunnel tests within a limited range of the required operating envelope. A preliminary design study provided several suitable thermal protection system designs for the combustor, one of which was a two-pass regenerative type air-cooled omega-shaped segment liner. A final design layout of the omega segment liner was prepared and analyzed for steady-state and transient conditions. The design of a support system for the fuel spray bar assembly was also included. Detail drawings suitable for fabrication purposes were also prepared. Liner design problems defined during the preliminary study included (1) the ingress of gas into the attachment bulb section of the omega segment, (2) the large thermal gradient along the leg of the omega bulb attachment section and, (3) the local peak metal temperature at the radius between the liner ID and the leg of the bulb attachment. These were resolved during the final design task. Analyses of the final design of the omega segment liner indicated that all design goals were met and the design provided the capability of operating over the required test envelope with a life expectancy substantially above the goal of 1500 cycles.

  14. SEASAT study documentation

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The proposed spacecraft consists of a bus module, containing all subsystems required for support of the sensors, and a payload module containing all of the sensor equipment. The two modules are bolted together to form the spacecraft, and electrical interfaces are accomplished via mated connectors at the interface plane. This approach permits independent parallel assembly and test operations on each module up until mating for final spacecraft integration and test operations. Proposed program schedules recognize the need to refine sensor/spacecraft interfaces prior to proceeding with procurement, reflect the lead times estimated by suppliers for delivery of equipment, reflect a comprehensive test program, and provide flexibility for unanticipated problems. The spacecraft systems are described in detail along with aerospace ground equipment, ground handling equipment, the launch vehicle, imaging radar incorporation, and systems tests.

  15. Enhanced teaching and student learning through a simulator-based course in chemical unit operations design

    NASA Astrophysics Data System (ADS)

    Ghasem, Nayef

    2016-07-01

    This paper illustrates a teaching technique used in computer applications in chemical engineering employed for designing various unit operation processes, where the students learn about unit operations by designing them. The aim of the course is not to teach design, but rather to teach the fundamentals and the function of unit operation processes through simulators. A case study presenting the teaching method was evaluated using student surveys and faculty assessments, which were designed to measure the quality and effectiveness of the teaching method. The results of the questionnaire conclusively demonstrate that this method is an extremely efficient way of teaching a simulator-based course. In addition to that, this teaching method can easily be generalised and used in other courses. A student's final mark is determined by a combination of in-class assessments conducted based on cooperative and peer learning, progress tests and a final exam. Results revealed that peer learning can improve the overall quality of student learning and enhance student understanding.

  16. Crew Autonomous Scheduling Test (CAST)

    NASA Image and Video Library

    2017-07-18

    iss052e016190 (July 18, 2017) --- Astronaut Peggy Whitson is photographed sitting in front of the Cupola windows during the final Crew Autonomous Scheduling Test (CAST) session. The CAST investigation analyzes whether crews can develop plans in a reasonable period of time with appropriate input, whether proximity of planners to the planned operations increases efficiency, and if crew members are more satisfied when given a role in plan development.

  17. Bootstrap-based procedures for inference in nonparametric receiver-operating characteristic curve regression analysis.

    PubMed

    Rodríguez-Álvarez, María Xosé; Roca-Pardiñas, Javier; Cadarso-Suárez, Carmen; Tahoces, Pablo G

    2018-03-01

    Prior to using a diagnostic test in a routine clinical setting, the rigorous evaluation of its diagnostic accuracy is essential. The receiver-operating characteristic curve is the measure of accuracy most widely used for continuous diagnostic tests. However, the possible impact of extra information about the patient (or even the environment) on diagnostic accuracy also needs to be assessed. In this paper, we focus on an estimator for the covariate-specific receiver-operating characteristic curve based on direct regression modelling and nonparametric smoothing techniques. This approach defines the class of generalised additive models for the receiver-operating characteristic curve. The main aim of the paper is to offer new inferential procedures for testing the effect of covariates on the conditional receiver-operating characteristic curve within the above-mentioned class. Specifically, two different bootstrap-based tests are suggested to check (a) the possible effect of continuous covariates on the receiver-operating characteristic curve and (b) the presence of factor-by-curve interaction terms. The validity of the proposed bootstrap-based procedures is supported by simulations. To facilitate the application of these new procedures in practice, an R-package, known as npROCRegression, is provided and briefly described. Finally, data derived from a computer-aided diagnostic system for the automatic detection of tumour masses in breast cancer is analysed.

  18. Developmental Testing of Liquid and Gaseous/Vaporous Decontamination on Bacterial Spores and Other Biological Warfare Agents on Military Relevant Surfaces

    DTIC Science & Technology

    2016-02-11

    process ( gas /vapor or liquid ), sampling will be conducted as soon as possible. Samples will be incubated for 12 to 48 hours (depending on the...Final 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Test Operations Procedure (TOP) 08-2-065 Developmental Testing of Liquid and Gaseous...biological decontamination protocol to analyze the efficacy of liquid and gaseous/vaporous decontaminants on military-relevant surfaces. The

  19. Family Housing Metering Test. A Test Program to Determine the Feasibility of Installing Utility Meters in Military Family Housing, Developing Energy Ceilings, and Operating a Penalty Billing System for Occupants Who Overconsume Energy. Volume II. Appendices.

    DTIC Science & Technology

    1980-03-01

    implementation. 5.2 NORM PAMPHLET The norm pamphlet is a short, picture-oriented brochure to introduce military housing occupants to the use of the energy...tne final version of the pamplet , feedbaci roejrdiag the. draf t version sill be solicited from the fiefl test par- ticipants. rhe followlag is a rouga

  20. Electronic intermodal supply chain manifest field operational test evaluation draft final report

    DOT National Transportation Integrated Search

    2002-12-01

    This report presents the results of a 2.5 year freight ITS evaluation of an air cargo security and logistics system which was deployed at OHare and JFK international airports. In September 1999, the Federal Highway Administration (FHWA) and the Fe...

  1. Teen driver support system (TDSS) field operational test : final report.

    DOT National Transportation Integrated Search

    2015-11-01

    Although teen drivers make up a small percentage of the U.S. driving population, they are at an especially high risk : of being involved in a crash. Factors that contribute to teen drivers risk include their lack of experience and their : tendency...

  2. Final report of the evaluation of the FORETELL consortium operational test : weather information for surface transportation

    DOT National Transportation Integrated Search

    2003-04-01

    Over 17 percent of all fatal crashes occur during winter weather conditions. Of those, 60 percent happen in rural areas (most on non-interstate roadways). The Federal Highway Administration (FHWA) Intelligent Transportation System (ITS) Joint Program...

  3. National evaluation of the TMC applications of archived data operational test -- ADMS Virginia

    DOT National Transportation Integrated Search

    1999-01-01

    As a part of its risk management efforts, the Office of Motor Carriers sponsored a risk-based evaluation of roadside violations. This tech brief summarizes the study final report. The evaluation sought to categorize each commercial motor vehicle (CMV...

  4. Idaho storm warning system operational test : final report

    DOT National Transportation Integrated Search

    2000-12-01

    The Storm Warning Project was initiated in 1993 as a result of a large number of serious traffic crashes that occurred during periods of low visibility on I-84 in southeastern Idaho between 1988 and 1993. The purpose of the project was to determine i...

  5. Hardware test program for evaluation of baseline range/range rate sensor concept

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The Hardware Test Program for evaluation of the baseline range/range rate sensor concept was initiated 11 September 1984. This ninth report covers the period 12 May through 11 June 1885. A contract amendment adding a second phase has extended the Hardware Test Program through 10 December 1985. The objective of the added program phase is to establish range and range measurement accuracy and radar signature characteristics for a typical spacecraft target. Phase I of the Hardware Test Program was designed to reduce the risks associated with the Range/Range Rate (R/R) Sensor baseline design approach. These risks are associated with achieving the sensor performance required for the two modes of operation, the Interrupted CW (ICW) mode for initial acquisition and tracking to close-in ranges, and the CW mode, providing coverage during the final docking maneuver. The risks associated with these modes of operation have to do with the realization of adequate sensitivity to operate to their individual maximum ranges.

  6. Programs for Testing Processor-in-Memory Computing Systems

    NASA Technical Reports Server (NTRS)

    Katz, Daniel S.

    2006-01-01

    The Multithreaded Microbenchmarks for Processor-In-Memory (PIM) Compilers, Simulators, and Hardware are computer programs arranged in a series for use in testing the performances of PIM computing systems, including compilers, simulators, and hardware. The programs at the beginning of the series test basic functionality; the programs at subsequent positions in the series test increasingly complex functionality. The programs are intended to be used while designing a PIM system, and can be used to verify that compilers, simulators, and hardware work correctly. The programs can also be used to enable designers of these system components to examine tradeoffs in implementation. Finally, these programs can be run on non-PIM hardware (either single-threaded or multithreaded) using the POSIX pthreads standard to verify that the benchmarks themselves operate correctly. [POSIX (Portable Operating System Interface for UNIX) is a set of standards that define how programs and operating systems interact with each other. pthreads is a library of pre-emptive thread routines that comply with one of the POSIX standards.

  7. A toxicity reduction evaluation for an oily waste treatment plant exhibiting episodic effluent toxicity.

    PubMed

    Erten-Unal, M; Gelderloos, A B; Hughes, J S

    1998-07-30

    A Toxicity Reduction Evaluation (TRE) was conducted on the oily wastewater treatment plant (Plant) at a Naval Fuel Depot. The Plant treats ship and ballast wastes, berm water from fuel storage areas and wastes generated in the fuel reclamation plant utilizing physical/chemical treatment processes. In the first period of the project (Period I), the TRE included chemical characterization of the plant wastewaters, monitoring the final effluent for acute toxicity and a thorough evaluation of each treatment process and Plant operating procedures. Toxicity Identification Evaluation (TIE) procedures were performed as part of the overall TRE to characterize and identify possible sources of toxicity. Several difficulties were encountered because the effluent was saline, test organisms were marine species and toxicity was sporadic and unpredictable. The treatability approach utilizing enhancements, improved housekeeping, and operational changes produced substantial reductions in the acute toxicity of the final effluent. In the second period (Period II), additional acute toxicity testing and chemical characterization were performed through the Plant to assess the long-term effects of major unit process improvements for the removal of toxicity. The TIE procedures were also modified for saline wastewaters to focus on suspected class of toxicants such as surfactants. The TRE was successful in reducing acute toxicity of the final effluent through process improvements and operational modifications. The results indicated that the cause of toxicity was most likely due to combination of pollutants (matrix effect) rather than a single pollutant.

  8. Airborne laser-diode-array illuminator assessment for the night vision's airborne mine-detection arid test

    NASA Astrophysics Data System (ADS)

    Stetson, Suzanne; Weber, Hadley; Crosby, Frank J.; Tinsley, Kenneth; Kloess, Edmund; Nevis, Andrew J.; Holloway, John H., Jr.; Witherspoon, Ned H.

    2004-09-01

    The Airborne Littoral Reconnaissance Technologies (ALRT) project has developed and tested a nighttime operational minefield detection capability using commercial off-the-shelf high-power Laser Diode Arrays (LDAs). The Coastal System Station"s ALRT project, under funding from the Office of Naval Research (ONR), has been designing, developing, integrating, and testing commercial arrays using a Cessna airborne platform over the last several years. This has led to the development of the Airborne Laser Diode Array Illuminator wide field-of-view (ALDAI-W) imaging test bed system. The ALRT project tested ALDAI-W at the Army"s Night Vision Lab"s Airborne Mine Detection Arid Test. By participating in Night Vision"s test, ALRT was able to collect initial prototype nighttime operational data using ALDAI-W, showing impressive results and pioneering the way for final test bed demonstration conducted in September 2003. This paper describes the ALDAI-W Arid Test and results, along with processing steps used to generate imagery.

  9. Effectiveness of Shield Termination Techniques Tested with TEM Cell and Bulk Current Injection

    NASA Technical Reports Server (NTRS)

    Bradley, Arthur T.; Hare, Richard J.

    2009-01-01

    This paper presents experimental results of the effectiveness of various shield termination techniques. Each termination technique is evaluated by two independent noise injection methods; transverse electromagnetic (TEM) cell operated from 3 MHz 400 MHz, and bulk current injection (BCI) operated from 50 kHz 400 MHz. Both single carrier and broadband injection tests were investigated. Recommendations as to how to achieve the best shield transfer impedance (i.e. reduced coupled noise) are made based on the empirical data. Finally, the noise injection techniques themselves are indirectly evaluated by comparing the results obtained from the TEM Cell to those from BCI.

  10. The orbiter mate/demate device

    NASA Technical Reports Server (NTRS)

    Miller, A. J.; Binkley, W. H.

    1985-01-01

    The numerous components and systems of the space shuttle orbiter mate/demate device (MDD) are discussed. Special emphasis is given, mechanisms and mechanical systems to discuss in general their requirements, functions, and design; and, where applicable, to relate any unusual problems encountered during the initial concept studies, final design, and construction are discussed. The MDD and its electrical, machinery, and mechanical systems, including the main hoisting system, power operated access service platform, wind restrain and adjustment mechanism, etc., were successfully designed and constructed. The MDD was used routinely during the initial orbiter-747 approach and landing test and the more recent orbiter flight tests recovery and mate operations.

  11. Solar heater/cooler for mass market

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Electrical energy consumption is reduced by half for 2 1/2 story office building. 138 liquid flat plate solar collectors are mounted on building roof, which faces nearly due south. Final project report includes detailed drawings and photographs, operation and maintenance manual, acceptance test plan, and related information.

  12. 76 FR 2832 - National Emission Standards for Hazardous Air Pollutants From the Portland Cement Manufacturing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-18

    ... operated and is not dominant in its field. After considering the economic impact of this direct final rule... electrostatic precipitator) during the D/F performance test is 400 [deg]F or less, this limit is changed to 0.4...

  13. Explosive detection systems data collection final report

    DTIC Science & Technology

    2016-10-01

    Institute of Standards and Technology (NIST) project to develop standards for bomb squad operators. Under this effort, ARA was tasked with developing and...Collection (EDSDC) ................................................................ 5    DHS/NIST Support ( Bomb Squad Robotic Training Standards...Development ................................................................................................ 5  Figure 3. Layout of the Bomb Squad Test

  14. Traffic monitoring using satellite and ground data : preparation for feasibility tests and an operational system, final report.

    DOT National Transportation Integrated Search

    2000-04-01

    Satellite imagery could conceivably be added to data traditionally collected in traffic monitoring programs to allow wide spatial coverage unobtainable from ground-based sensors in a safe, off-the-road environment. Previously, we estimated that 1-m r...

  15. Technical summary : Travtek operational test evaluation : final reports

    DOT National Transportation Integrated Search

    2009-01-01

    This guide is packed with useful information. It focuses on some of the less well-known safety messages the road offers you. It is designed to be kept in your glove compartment after it has been read so that you will have its valuable information at ...

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hunter, R.B.

    This is the final progress report of a Department of Energy (DOE), Nevada operations Office (NV), program to monitor the ecology of the Nevada Test Site (NTS). The eight-year Basic Environmental Compliance and Monitoring Program (BECAMP) included meeting goals of understanding the spatial and temporal changes of plants and animals on the NTS, and determining the effects of DOE operations on those plants and animals. Determination of the changes was addressed through monitoring the most common plant and animal species at undisturbed (baseline) plots located in the major NTS valleys and mesas. One plot in Yucca Flat, the site ofmore » most nuclear weapons tests, was monitored annually, while other baseline plots were censused on a three- or four-year cycle. Effects of DOE operations were examined at sites of major disturbances, related to both DOE operations and natural disturbance mechanisms, censused on a three-year cycle. This report concentrates on work completed in 1994.« less

  17. Development of low head Kaplan turbine for power station rehabilitation project

    NASA Astrophysics Data System (ADS)

    Lim, S. M.; Ohtake, N.; Kurosawa, S.; Suzuki, T.; Yamasaki, T.; Nishi, H.

    2012-11-01

    This paper presents the latest Kaplan turbine rehabilitation project for Funagira Power Station in Japan completed by J-POWER Group in collaboration with Toshiba Corporation. Area of rehabilitation was restricted to guide vane and runner. The main goal of the rehabilitation project was to expand the operating range of the existing turbine in terms of discharge and power with high operational stability, low noise as well as high cavitation performance. Computational Fluids Dynamics and model test were used to optimize the shape of guide vane and runner in development stage. Finally, field tests and runner inspection were carried out to confirm the performance of the new turbine. It was found that the new turbine has excellent performance in efficiency, power output, operational stability compared with existing turbine. Moreover, no sign of cavitation on the runner blade surface was observed after 5078 hours of operation near 100% load.

  18. Performance of a diesel engine operating on raw coal-diesel fuel and solvent refined coal-diesel fuel slurries. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marshall, H.P.

    1980-03-01

    Performance tests using an 11 kW single cylinder diesel engine were made to determine the effects of three different micronized coal-fuel oil slurries being considered as alternative fuels. Slurries containing 20, 32, and 40%-wt micronized raw coal in No. 2 fuel oil were used. Results are presented indicating the changes in the concentrations of SO/sub X/ and NO/sub X/ in the exhaust, exhaust opacity, power and efficiency, and in wear rates relative to operation on fuel oil No. 2. The engine was operated for 10 h at full load and 1400 rpm on al fuels except the 40%-wt slurry. Thismore » test was discontinued because of extremely poor performance.« less

  19. Performance of a diesel engine operating on raw coal-diesel fuel and solvent refined coal-diesel fuel slurries. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marshall, H.P.

    1980-03-01

    Performance tests using an 11 kw single cylinder diesel engine were made to determine the effects of three different micronized coal-fuel oil slurries being considered as alternative fuels. Slurries containing 20, 32, and 40 percent by weight micronized raw coal in No. 2 fuel oil were used. Results are presented indicating the changes in the concentrations of SO/sub X/ and NO/sub X/ in the exhaust, exhaust opacity, power and efficiency, and in wear rates relative to operation on fuel oil No. 2. The engine was operated for 10 hrs at full load and 1400 rpm on all fuels except themore » 40% by weight slurry. This test was discontinued because of extremely poor performance.« less

  20. Testing and reference model analysis of FTTH system

    NASA Astrophysics Data System (ADS)

    Feng, Xiancheng; Cui, Wanlong; Chen, Ying

    2009-08-01

    With rapid development of Internet and broadband access network, the technologies of xDSL, FTTx+LAN , WLAN have more applications, new network service emerges in endless stream, especially the increase of network game, meeting TV, video on demand, etc. FTTH supports all present and future service with enormous bandwidth, including traditional telecommunication service, traditional data service and traditional TV service, and the future digital TV and VOD. With huge bandwidth of FTTH, it wins the final solution of broadband network, becomes the final goal of development of optical access network.. Fiber to the Home (FTTH) will be the goal of telecommunications cable broadband access. In accordance with the development trend of telecommunication services, to enhance the capacity of integrated access network, to achieve triple-play (voice, data, image), based on the existing optical Fiber to the curb (FTTC), Fiber To The Zone (FTTZ), Fiber to the Building (FTTB) user optical cable network, the optical fiber can extend to the FTTH system of end-user by using EPON technology. The article first introduced the basic components of FTTH system; and then explain the reference model and reference point for testing of the FTTH system; Finally, by testing connection diagram, the testing process, expected results, primarily analyze SNI Interface Testing, PON interface testing, Ethernet performance testing, UNI interface testing, Ethernet functional testing, PON functional testing, equipment functional testing, telephone functional testing, operational support capability testing and so on testing of FTTH system. ...

  1. Technology Proliferation: Acquisition Strategies and Opportunities for an Uncertain Future

    DTIC Science & Technology

    2018-04-20

    The large programs of record characteristic of federal acquisition consist of rigorous research, development, testing, and evaluation (RDT&E...and evaluation (IOT&E) activities drive the program toward the decision to enter full rate production (FRP). Finally, in the sustainment phase, the...the new feature by a full release at a later date, or halt the development altogether. As stated by the Director of Operational Test and Evaluation

  2. An Evaluation of Computerized Tests as Predictors of Job Performance: II. Differential Validity for Global and Job Element Criteria. Final Report.

    ERIC Educational Resources Information Center

    Cory, Charles H.

    This report presents data concerning the validity of a set of experimental computerized and paper-and-pencil tests for measures of on-job performance on global and job elements. It reports on the usefulness of 30 experimental and operational variables for predicting marks on 42 job elements and on a global criterion for Electrician's Mate,…

  3. Use of a Commercially Available Flight Simulator during Aircrew Performance Testing.

    DTIC Science & Technology

    1991-11-01

    Automiated Battery of Performance-based Tests, NAMRL 1354, Naval Aerospace Medical Research Laboratory, Pensacola, FL, 1990. 13. Human Performance...ability of an aircraft to remain airborne well beyond the limits of its human operator. This capacity for longer flights, coupled with a tendency for short...Measurement, Final Report, Air Force Human Resources Laboratory, Brooks AFB, TX, 1983. 5. Stein, E.S., Measurement of Pilot Performance: A Master Journeyman

  4. Data management system DIU test system

    NASA Technical Reports Server (NTRS)

    1976-01-01

    An operational and functional description is given of the data management system. Descriptions are included for the test control unit, analog stimulus panel, discrete stimulus panel, and the precision source. The mechanical configuration is defined and illustrated to provide card and component location for modification or repair. The unit level interfaces are mirror images of the DIU interfaces and are described in the Final Technical Report for NASA-MSFC contract NAS8-29155.

  5. New STS-1 Electronics: Development and Test Results

    NASA Astrophysics Data System (ADS)

    Uhrhammer, R. A.; Karavas, B.; Friday, J.; Vanzandt, T.; Hutt, C. R.; Wielandt, E.; Romanowicz, B.

    2007-12-01

    The STS-1 seismometer is currently the principal very broad-band (VBB) seismometer used in global or regional seismic networks operated by members of the Federation of Digital Broad-Band Seismograph Networks (FDSN). It is widely viewed as the finest VBB sensor in the world, Unfortunately, many of the STS-1's, which were manufactured and installed 10-20 years ago, are encountering both operational failures and age-related degradation. This problem is exacerbated by the fact that sensors are no longer being produced or supported by the original manufacturer, G. Streckeisen AG. In a first step towards assuring continued high quality of VBB data for decades to come, we have developed and tested new electronics and methods for mechanical repair for the STS-1 very broadband seismometer. This is a collaborative project with Tom VanZandt of Metrozet, LLC (Redondo Beach, CA) and Erhard Wielandt (original designer of the STS-1), and has been funded by a grant from NSF through the IRIS/GSN program. A primary goal of this effort was to develop a fully-tested, modern electronics module that will be a drop-in replacement for the original electronics. This new electronics design addresses environmental packaging problems that have led to operational degradation and failures in the existing instruments. This effort also provided the opportunity to implement a set of electronic improvements that will make the installation and operation of the sensors more efficient. Metrozet developed the first prototype new electronics for the STS-1, while the BSL engineering staff constructed a test-bed at the Byerly Vault (BKS) and developed the capability to simultaneously test 6-8 STS-1 components. BSL staff then tested successive versions of the electronics. The first generation prototype electronics did not include centering or calibration functionality. The second generation prototype included remote centering functionality as well as calibration functions. After some observations and refinements, this generation of electronics was operated on two seismometers concurrently and successfully run through swept sine and step calibration functions on four seismometers. During this final phase, the Metrozet electronics included the ability to initiate and operate the calibrations via a network (Ethernet) connection. Most of the calibration testing was performed remotely from Metrozet's Southern California office over the BSL network. Metrozet was able to remotely log into the Berkeley network, establish a connection to the test bed in the Byerly seismic vault and initiate control of the seismometer including remote centering and calibration functions. Finally, after BSL tests were completed and the development appeared complete and satisfactory, the new electronics were tested at the Albuquerque Seismological Laboratory's seismic vault, which is located in a quieter environment than BKS. The new electronics package was also field tested at the BDSN broadband station HOPS. We present detailed results of the calibrations.

  6. Final Evaluation of Rain Erosion Sled Test Results at Mach 3.7 to 5.0 for Slip-Cast Fused Silica Radome Structures

    DTIC Science & Technology

    1979-03-06

    capable of testing radome materials in multiple impact simulated rain at Mach 5 is the monorail sled facility at the Holloman Air Force Base, New Mexico...existing 9-in. monorail sled at the Holloman test track, to be structurally adequate for the environment, and to carry samples of the desired shape...direction over a total length of 15,480 m(50,788 ft). For Mach 5 rain erosion tests, the sled operates on a monorail . Braking for these monorail

  7. Post-test navigation data analysis techniques for the shuttle ALT

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Postflight test analysis data processing techniques for shuttle approach and landing tests (ALT) navigation data are defined. Postfight test processor requirements are described along with operational and design requirements, data input requirements, and software test requirements. The postflight test data processing is described based on the natural test sequence: quick-look analysis, postflight navigation processing, and error isolation processing. Emphasis is placed on the tradeoffs that must remain open and subject to analysis until final definition is achieved in the shuttle data processing system and the overall ALT plan. A development plan for the implementation of the ALT postflight test navigation data processing system is presented. Conclusions are presented.

  8. Conduct overall test operations and evaluate two Doppler systems to detect, track and measure velocities in aircraft wake vortices

    NASA Technical Reports Server (NTRS)

    Wilson, D. J.; Krause, M. C.; Craven, C. E.; Edwards, B. B.; Coffey, E. W.; Huang, C. C.; Jetton, J. L.; Morrison, L. K.

    1974-01-01

    A program plan for system evaluation of the two-dimensional Scanning Laser Doppler System (SLDS) is presented. In order to meet system evaluation and optimization objectives the following tests were conducted: (1) noise tests; (2) wind tests; (3) blower flowfield tests; (4) single unit (1-D) flyby tests; and (5) dual unit (2-D) flyby tests. Test results are reported. The final phase of the program included logistics preparation, equipment interface checkouts, and data processing. It is concluded that the SLDS is capable of accurately tracking aircraft wake vortices from small or large aircraft, and in any type of weather.

  9. A New Large Vibration Test Facility Concept for the James Webb Space Telescope

    NASA Technical Reports Server (NTRS)

    Ross, Brian P.; Johnson, Eric L.; Hoksbergen, Joel; Lund, Doug

    2014-01-01

    The James Webb Space Telescope consists of three main components, the Integrated Science Instrument Module (ISIM) Element, the Optical Telescope Element (OTE), and the Spacecraft Element. The ISIM and OTE are being assembled at the National Aeronautics and Space Administration's Goddard Spaceflight Center (GSFC). The combined OTE and ISIM Elements, called OTIS, will undergo sine vibration testing before leaving Goddard. OTIS is the largest payload ever tested at Goddard and the existing GSFC vibration facilities are incapable of performing a sine vibration test of the OTIS payload. As a result, a new large vibration test facility is being designed. The new facility will consist of a vertical system with a guided head expander and a horizontal system with a hydrostatic slip table. The project is currently in the final design phase with installation to begin in early 2015 and the facility is expected to be operational by late 2015. This paper will describe the unique requirements for a new large vibration test facility and present the selected final design concepts.

  10. Fabrication Control Plan for ORNL RH-LOCA ATF Test Specimens to be Irradiated in the ATR

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Field, Kevin G.; Howard, Richard; Teague, Michael

    2014-06-01

    The purpose of this fabrication plan is (1) to summarize the design of a set of rodlets that will be fabricated and then irradiated in the Advanced Test Reactor (ATR) and (2) provide requirements for fabrication and acceptance criteria for inspections of the Light Water Reactor (LWR) – Accident Tolerant Fuels (ATF) rodlet components. The functional and operational (F&OR) requirements for the ATF program are identified in the ATF Test Plan. The scope of this document only covers fabrication and inspections of rodlet components detailed in drawings 604496 and 604497. It does not cover the assembly of these items tomore » form a completed test irradiation assembly or the inspection of the final assembly, which will be included in a separate INL final test assembly specification/inspection document. The controls support the requirements that the test irradiations must be performed safely and that subsequent examinations must provide valid results.« less

  11. 4950TH Test Group (N) Final Report. Operation PLUMBBOB

    DTIC Science & Technology

    1980-12-01

    READ INSTRUCTIONS BEFORE COMPLETING FORM 1. nlCiniNT’t CAT »LOC MUMBtR 1. TVPC Or RCPONT * PCRIOO COVCRCD ft. PCRrOMUINC ORC. RtPORT...r^ny letterr end gave rapid answers end decisions on individual questions and problen ercas as thej’ arose. The daily shuttle was giro utilised...encr^cmcy power tod con- Irnucd operations. CaT ^nications: All conminications normal except as noted under rrncrks. I.r-^arks: Reference Item

  12. An Investigation of Potential Uses of Animals in Coast Guard Operations

    DTIC Science & Technology

    1981-06-01

    wellhead assembly ("Christmas tree") which Is a series of valves, controls and connections designed to regulate the flow of fluids from the -well...personnel reconnaissance. 9 0 Infrared emitters have been designed and tested for locating patrol and sentry dogs at night.91 Finally, in Project...principle of operant conditioning is "shaping" or the method of successive approximations. In order to design a completely new -3 -83- Si . behavior

  13. UAS Integration in the NAS Project: Flight Test 3 Data Analysis of JADEM-Autoresolver Detect and Avoid System

    NASA Technical Reports Server (NTRS)

    Gong, Chester; Wu, Minghong G.; Santiago, Confesor

    2016-01-01

    The Unmanned Aircraft Systems Integration in the National Airspace System project, or UAS Integration in the NAS, aims to reduce technical barriers related to safety and operational challenges associated with enabling routine UAS access to the NAS. The UAS Integration in the NAS Project conducted a flight test activity, referred to as Flight Test 3 (FT3), involving several Detect-and-Avoid (DAA) research prototype systems between June 15, 2015 and August 12, 2015 at the Armstrong Flight Research Center (AFRC). This report documents the flight testing and analysis results for the NASA Ames-developed JADEM-Autoresolver DAA system, referred to as 'Autoresolver' herein. Four flight test days (June 17, 18, 22, and July 22) were dedicated to Autoresolver testing. The objectives of this test were as follows: 1. Validate CPA prediction accuracy and detect-and-avoid (DAA, formerly known as self-separation) alerting logic in realistic flight conditions. 2. Validate DAA trajectory model including maneuvers. 3. Evaluate TCAS/DAA interoperability. 4. Inform final Minimum Operating Performance Standards (MOPS). Flight test scenarios were designed to collect data to directly address the objectives 1-3. Objective 4, inform final MOPS, was a general objective applicable to the UAS in the NAS project as a whole, of which flight test is a subset. This report presents analysis results completed in support of the UAS in the NAS project FT3 data review conducted on October 20, 2015. Due to time constraints and, to a lesser extent, TCAS data collection issues, objective 3 was not evaluated in this analysis.

  14. The design of a light aircraft automated dropsonde launcher

    NASA Astrophysics Data System (ADS)

    Pasken, Gregory R.

    The use of the National Center for Atmospheric Research's dropsonde system is currently limited to large NASA, NSF and NOAA operated research aircraft, which are expensive to fly and are over-subscribed. Designing a new dropsonde system for a smaller, less expensive to operate light aircraft will make the dropsonde system available to a much wider research community. To test this concept, a dropsonde launch system designed to fit in the cargo door of a twin engine Piper Seminole is developed and tested. Although the launch system for the light aircraft dropsonde launcher has gone through many designs, a prototype is built and tested from the final design using Tetra for the computation fluid dynamics and stress testing, as Tetra has material properties for solids as well as fluids. The design is further tested in the wind tunnel. These tests show that the new design is a viable alternative for light aircraft, thus allowing dropsondes to be more widely used. The results of the ABAQUS, SC Tetra simulations, and the wind tunnel results of the final design are covered and discussed. The settings used for the ABAQUS and SC Tetra simulations are described in detail. ABAQUS simulations are conducted to perform stress testing and SC Tetra is used for CFD simulations. The SC Tetra simulations provide a more comprehensive picture of the design, as SC Tetra is able to perform the stress testing, as well as pressure testing, allowing for more accurate results. The limitations of ABAQUS simulations require numerous assumptions for loading that may or may not be realistic.

  15. Final Report on Jobin Yvon Contained Inductively Coupled Plasma Emission Spectrometer

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pennebaker, F.M.

    2003-03-17

    A new Inductively Coupled Plasma -- Emission Spectrometer (ICP-ES) was recently purchased and installed in Lab B-147/151 at SRTC. The contained JY Model Ultima 170-C ICP-ES has been tested and compared to current ADS ICP-ES instrumentation. The testing has included both performance tests to evaluate instrumental ability, and the measurement of matrix standards commonly analyzed by ICP-ES at Savannah River. In developing operating procedures for this instrument, we have implemented the use of internal standards and off-peak background subtraction. Both of these techniques are recommended by EPA SW-846 ICP-ES methods and are common to current ICP-ES operations. Based on themore » testing and changes, the JY Model Ultima 170-C ICP-ES provides improved performance for elemental analysis of radioactive samples in the Analytical Development Section.« less

  16. Market Assessment For Traveler Services, A Choice Modeling Study Phase Iii, Fast-Trac Deliverable, #16B: Final Choice Modeling Report

    DOT National Transportation Integrated Search

    1999-02-12

    FAST-TRAC : THIS REPORT DESCRIBES THE CHOICE MODEL STUDY OF THE FAST-TRAC (FASTER AND SAFER TRAVEL THROUGH TRAFFIC ROUTING AND ADVANCED CONTROLS) OPERATIONAL TEST IN SOUTHEAST MICHIGAN. CHOICE MODELING IS A STATED-PREFERENCE APPROACH IN WHICH RESP...

  17. A combined report for freight information real-time system for transport (FIRST). Part A, final evaluation. Part B, detailed test plans

    DOT National Transportation Integrated Search

    2002-05-30

    The ultimate goal of this evaluation is to identify any benefits in operational efficiency, air quality, and customer satisfaction with the implementation of the FIRST information technology system for the intermodal freight industry at the Port of N...

  18. Rural Free Universities: Extending the UFM Model. Final Report.

    ERIC Educational Resources Information Center

    Maes, Sue C.

    Operating under a grant, the University for Man (UFM) in Manhattan, Kansas, tested the transferability of the UFM free university/community education model using four existing statewide delivery systems (public libraries, a private college consortium, a state cooperative extension service, an office of rural affairs) in five states: Kentucky,…

  19. NASA's James Webb Space Telescope Science Instruments Begin Final Super Cold Test at Goddard

    NASA Image and Video Library

    2017-12-08

    At NASA's James Webb Space Telescope's final destination in space, one million miles away from Earth, it will operate at incredibly cold temperatures of -387 degrees Fahrenheit, or 40 degrees Kelvin. This is 260 degrees Fahrenheit colder than any place on the Earth’s surface has ever been. So first, this final super cold test at Goddard will prepare the Integrated Science Instrument Module (ISIM), or the “heart” of the telescope, for space. Read more: go.nasa.gov/1KFPwJG Credit: NASA/Goddard/Chris Gunn NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram

  20. ALSEP termination report

    NASA Technical Reports Server (NTRS)

    Bates, J. R.; Lauderdale, W. W.; Kernaghan, H.

    1979-01-01

    The Apollo Lunar Surface Experiments Package (ALSEP) final report was prepared when support operations were terminated September 30, 1977, and NASA discontinued the receiving and processing of scientific data transmitted from equipment deployed on the lunar surface. The ALSEP experiments (Apollo 11 to Apollo 17) are described and pertinent operational history is given for each experiment. The ALSEP data processing and distribution are described together with an extensive discussion on archiving. Engineering closeout tests and results are given, and the status and configuration of the experiments at termination are documented. Significant science findings are summarized by selected investigators. Significant operational data and recommendations are also included.

  1. Humidity Testing for Human Rated Spacecraft

    NASA Technical Reports Server (NTRS)

    Johnson, Gary B.

    2009-01-01

    Determination that equipment can operate in and survive exposure to the humidity environments unique to human rated spacecraft presents widely varying challenges. Equipment may need to operate in habitable volumes where the atmosphere contains perspiration, exhalation, and residual moisture. Equipment located outside the pressurized volumes may be exposed to repetitive diurnal cycles that may result in moisture absorption and/or condensation. Equipment may be thermally affected by conduction to coldplate or structure, by forced or ambient air convection (hot/cold or wet/dry), or by radiation to space through windows or hatches. The equipment s on/off state also contributes to the equipment s susceptibility to humidity. Like-equipment is sometimes used in more than one location and under varying operational modes. Due to these challenges, developing a test scenario that bounds all physical, environmental and operational modes for both pressurized and unpressurized volumes requires an integrated assessment to determine the "worst-case combined conditions." Such an assessment was performed for the Constellation program, considering all of the aforementioned variables; and a test profile was developed based on approximately 300 variable combinations. The test profile has been vetted by several subject matter experts and partially validated by testing. Final testing to determine the efficacy of the test profile on actual space hardware is in the planning stages. When validation is completed, the test profile will be formally incorporated into NASA document CxP 30036, "Constellation Environmental Qualification and Acceptance Testing Requirements (CEQATR)."

  2. Navy Technical Information Presentation System (NTIPS) Test and Implementation Strategy

    DTIC Science & Technology

    1981-12-01

    IC AROEROCK I NAOI S ~ i P RF R M N C AVI AT OIO N A N DDEPARTMENT STIPRUCTRMNES COMPUATIONAN DEPARTMENT -MATHEMATICS AND 17 LOGISTICS DEPARTMENT leI...and Subtitle) S . TYPE OF REPORT & PERIOD COVERED NAVY TECHNICAL INFORMATION PRESENTATION Final SYSTEM (NTIPS) TEST AND IMPLEMENTATION 6. PERFORMING...CLASSIFICATION OP THIS PAGE (1nor. Data Enteed) ock 20 continued) system operation, training, maintenance, and logistics support. This system was

  3. Soldier Satisfaction with Life in Restructured Units during Phase 1 of the Restructuring of the Heavy Division Test

    DTIC Science & Technology

    1979-09-01

    Smutz O ARI FIELD UNIT AT FORT HOOD, TEXAS ’ . : ’’ "".,,- U.S. Army Research Institute for the Behavioral and Social Sciences September 1979 Approved for...public release; distribution unlimited., , 801II 2(" 1<. U. S. ARMY RESEARCH INSTITUTE FOR THE BEHAVIORAL AND SOCIAL SCIENCES A Field Operating...S. Army Research Institute for the Behavioral and Social Sciences. ATTN PERI-P, 5001 Eisenhower Avenue, Alexandria, Virginia 22333. FINAL

  4. Systems Issues In Terrestrial Fiber Optic Link Reliability

    NASA Astrophysics Data System (ADS)

    Spencer, James L.; Lewin, Barry R.; Lee, T. Frank S.

    1990-01-01

    This paper reviews fiber optic system reliability issues from three different viewpoints - availability, operating environment, and evolving technologies. Present availability objectives for interoffice links and for the distribution loop must be re-examined for applications such as the Synchronous Optical Network (SONET), Fiber-to-the-Home (FTTH), and analog services. The hostile operating environments of emerging applications (such as FTTH) must be carefully considered in system design as well as reliability assessments. Finally, evolving technologies might require the development of new reliability testing strategies.

  5. Operational manual for MX-290 data-voice PN Mod, MX-291 data-voice PN DEMOD

    NASA Technical Reports Server (NTRS)

    1971-01-01

    This operation manual is also the final report of the program to design, assemble, checkout, and deliver to the customer three MX-290 transmitters and two MX-291 companion receivers. These equipments are designed and assembled to provide for maximum flexibility with respect to making changes in electrical circuits which may be required for future applications. A number of test points for monitoring and troubleshooting are provided along with easy access to subunits.

  6. Cryo-Vacuum Testing of the JWST Integrated Science Instrument Module

    NASA Technical Reports Server (NTRS)

    Kimble, Randy A.; Vila, M. Begona; Van Campen, Julie M.; Birkmann, Stephen M.; Comber, Brian J.; Fatig, Curtis C.; Glasse, Alistair C. H.; Glazer, Stuart D.; Kelly, Douglas M.; Mann, Steven D.; hide

    2016-01-01

    In late 2015 early 2016, a major cryo-vacuum test was carried out for the Integrated Science Instrument Module (ISIM) of the James Webb Space Telescope. This test comprised the final cryo-certification and calibration test of the ISIM before its delivery for integration with the rest of the JWST observatory. Over the roughly 100-day period of the round-the-clock test program, the full complement of ISIM flight instruments, structure, harness radiator, and electronics were put through a comprehensive program of thermal, optical, electrical, and operational tests. We briefly summarize the goals, setup, execution, and key results for this critical JWST milestone.

  7. Development of process control capability through the Browns Ferry Integrated Computer System using Reactor Water Clanup System as an example. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, J.; Mowrey, J.

    1995-12-01

    This report describes the design, development and testing of process controls for selected system operations in the Browns Ferry Nuclear Plant (BFNP) Reactor Water Cleanup System (RWCU) using a Computer Simulation Platform which simulates the RWCU System and the BFNP Integrated Computer System (ICS). This system was designed to demonstrate the feasibility of the soft control (video touch screen) of nuclear plant systems through an operator console. The BFNP Integrated Computer System, which has recently. been installed at BFNP Unit 2, was simulated to allow for operator control functions of the modeled RWCU system. The BFNP Unit 2 RWCU systemmore » was simulated using the RELAP5 Thermal/Hydraulic Simulation Model, which provided the steady-state and transient RWCU process variables and simulated the response of the system to control system inputs. Descriptions of the hardware and software developed are also included in this report. The testing and acceptance program and results are also detailed in this report. A discussion of potential installation of an actual RWCU process control system in BFNP Unit 2 is included. Finally, this report contains a section on industry issues associated with installation of process control systems in nuclear power plants.« less

  8. Vibration modes interference in the MEMS resonant pressure sensor

    NASA Astrophysics Data System (ADS)

    Zhang, Fangfang; Li, Anlin; Bu, Zhenxiang; Wang, Lingyun; Sun, Daoheng; Du, Xiaohui; Gu, Dandan

    2017-11-01

    A new type of coupled balanced-mass double-ended tuning fork resonator (CBDETF) pressure sensor is fabricated and tested. However, the low accuracy of the CBDETF pressure sensor is not satisfied to us. Based on systematic analysis and tests, the coupling effect between the operational mode and interference mode is considered to be the main cause for the sensor in accuracy. To solve this problem, the stiffness of the serpentine beams is increased to pull up the resonant frequency of the interfering mode and make it separate far from the operational mode. Finally, the accuracy of the CBDETF pressure sensor is improved from + /-0.5% to less than + /-0.03% of the Full Scale (F.S.).

  9. Effects on fatigue life of gate valves due to higher torque switch settings during operability testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Richins, W.D.; Snow, S.D.; Miller, G.K.

    1995-12-01

    Some motor operated valves now have higher torque switch settings due to regulatory requirements to ensure valve operability with appropriate margins at design basis conditions. Verifying operability with these settings imposes higher stem loads during periodic inservice testing. These higher test loads increase stresses in the various valve internal parts which may in turn increase the fatigue usage factors. This increased fatigue is judged to be a concern primarily in the valve disks, seats, yokes, stems, and stem nuts. Although the motor operators may also have significantly increased loading, they are being evaluated by the manufacturers and are beyond themore » scope of this study. Two gate valves representative of both relatively weak and strong valves commonly used in commercial nuclear applications were selected for fatigue analyses. Detailed dimensional and test data were available for both valves from previous studies at the Idaho National Engineering Laboratory. Finite element models were developed to estimate maximum stresses in the internal parts of the valves and to identity the critical areas within the valves where fatigue may be a concern. Loads were estimated using industry standard equations for calculating torque switch settings prior and subsequent to the testing requirements of USNRC Generic Letter 89--10. Test data were used to determine both; (1) the overshoot load between torque switch trip and final seating of the disk during valve closing and (2) the stem thrust required to open the valves. The ranges of peak stresses thus determined were then used to estimate the increase in the fatigue usage factors due to the higher stem thrust loads. The usages that would be accumulated by 100 base cycles plus one or eight test cycles per year over 40 and 60 years of operation were calculated.« less

  10. Some criteria for teleoperators and virtual environments from experiences with vehicle/operator simulation

    NASA Technical Reports Server (NTRS)

    Jex, Henry R.

    1991-01-01

    A review is given of a wide range of simulations in which operator steering control of a vehicle is involved and the dominant-clues, closed-loop bandwidth, measured operator effective time-delay, and ratio of bandwidth-to-inverse delay are summarized. A correlation of kinetosis with dynamic scene field-of-view is shown. The use of moving base simulators to improve the validity of locomotion teleoperations is discussed. some rules-of-thumb for good 'feel-system' simulation, such as for control manipulanda are given. Finally, simulation tests of teleoperators and virtual environments should include three types of measures: system performance, operator (or robot) 'behavior', and mental workload evaluations.

  11. Safely Enabling UAS Operations in Low-Altitude Airspace

    NASA Technical Reports Server (NTRS)

    Kopardekar, Parimal

    2017-01-01

    NASA is developing a system to safely enable low altitude unmanned aerial system (UAS) operations. The system is referred to as UAS Traffic Management (UTM). The UTM will safely enable a variety of business models and multiple operations in the same airspace. The UTM will provide services such as airspace configuration and geo-fencing, weather and wind integration, demand-capacity imbalance management, and separation management, and contingency management. The UTM research and development has been conducted in collaboration with many in industry, academia, and government. The UTM system will evolve through four builds. Each build will be collaboratively tested with partners. The final prototype will be available for persistent daily use of UAS operations beyond line of sight.

  12. Data mining-based coefficient of influence factors optimization of test paper reliability

    NASA Astrophysics Data System (ADS)

    Xu, Peiyao; Jiang, Huiping; Wei, Jieyao

    2018-05-01

    Test is a significant part of the teaching process. It demonstrates the final outcome of school teaching through teachers' teaching level and students' scores. The analysis of test paper is a complex operation that has the characteristics of non-linear relation in the length of the paper, time duration and the degree of difficulty. It is therefore difficult to optimize the coefficient of influence factors under different conditions in order to get text papers with clearly higher reliability with general methods [1]. With data mining techniques like Support Vector Regression (SVR) and Genetic Algorithm (GA), we can model the test paper analysis and optimize the coefficient of impact factors for higher reliability. It's easy to find that the combination of SVR and GA can get an effective advance in reliability from the test results. The optimal coefficient of influence factors optimization has a practicability in actual application, and the whole optimizing operation can offer model basis for test paper analysis.

  13. James Webb Space Telescope Optical Telescope Element Integrated Science Instrument Module (OTIS) Status

    NASA Technical Reports Server (NTRS)

    Feinberg, Lee; Voyton, Mark; Lander, Julie; Keski-Kuha, Ritva; Matthews, Gary

    2016-01-01

    The James Webb Space Telescope Optical Telescope Element (OTE) and Integrated ScienceInstrument Module (ISIM)are integrated together to form the OTIS. Once integrated, the OTIS undergoes primary mirrorcenter of curvatureoptical tests, electrical and operational tests, acoustics and vibration testing at the Goddard SpaceFlight Center beforebeing shipped to the Johnson Space Center for cryogenic optical testing of the OTIS. In preparationfor the cryogenicoptical testing, the JWST project has built a Pathfinder telescope and has completed two OpticalGround SystemEquipment (OGSE) cryogenic optical tests with the Pathfinder. In this paper, we will summarize opticaltest results todate and status the final Pathfinder test and the OTIS integration and environmental test preparations

  14. Solar Dynamics Observatory Launch and Commissioning

    NASA Technical Reports Server (NTRS)

    O'Donnell, James R., Jr.; Kristin, D.; Bourkland, L.; Hsu, Oscar C.; Liu, Kuo-Chia; Mason, Paul A. C.; Morgenstern, Wendy M.; Russo, Angela M.; Starin, Scott R.; Vess, Melissa F.

    2011-01-01

    The Solar Dynamics Observatory (SDO) was launched on February 11, 2010. Over the next three months, the spacecraft was raised from its launch orbit into its final geosynchronous orbit and its systems and instruments were tested and calibrated in preparation for its desired ten year science mission studying the Sun. A great deal of activity during this time involved the spacecraft attitude control system (ACS); testing control modes, calibrating sensors and actuators, and using the ACS to help commission the spacecraft instruments and to control the propulsion system as the spacecraft was maneuvered into its final orbit. This paper will discuss the chronology of the SDO launch and commissioning, showing the ACS analysis work performed to diagnose propellant slosh transient and attitude oscillation anomalies that were seen during commissioning, and to determine how to overcome them. The simulations and tests devised to demonstrate correct operation of all onboard ACS modes and the activities in support of instrument calibration will be discussed and the final maneuver plan performed to bring SDO on station will be shown. In addition to detailing these commissioning and anomaly resolution activities, the unique set of tests performed to characterize SDO's on-orbit jitter performance will be discussed.

  15. Hypothesis testing in students: Sequences, stages, and instructional strategies

    NASA Astrophysics Data System (ADS)

    Moshman, David; Thompson, Pat A.

    Six sequences in the development of hypothesis-testing conceptions are proposed, involving (a) interpretation of the hypothesis; (b) the distinction between using theories and testing theories; (c) the consideration of multiple possibilities; (d) the relation of theory and data; (e) the nature of verification and falsification; and (f) the relation of truth and falsity. An alternative account is then provided involving three global stages: concrete operations, formal operations, and a postformal metaconstructivestage. Relative advantages and difficulties of the stage and sequence conceptualizations are discussed. Finally, three families of teaching strategy are distinguished, which emphasize, respectively: (a) social transmission of knowledge; (b) carefully sequenced empirical experience by the student; and (c) self-regulated cognitive activity of the student. It is argued on the basis of Piaget's theory that the last of these plays a crucial role in the construction of such logical reasoning strategies as those involved in testing hypotheses.

  16. NASA Habitat Demonstration Unit (HDU) Deep Space Habitat Analog

    NASA Technical Reports Server (NTRS)

    Howe, A. Scott; Kennedy, Kriss J.; Gill, Tracy

    2013-01-01

    The NASA Habitat Demonstration Unit (HDU) vertical cylinder habitat was established as a exploration habitat testbed platform for integration and testing of a variety of technologies and subsystems that will be required in a human-occupied planetary surface outpost or Deep Space Habitat (DSH). The HDU functioned as a medium-fidelity habitat prototype from 2010-2012 and allowed teams from all over NASA to collaborate on field analog missions, mission operations tests, and system integration tests to help shake out equipment and provide feedback for technology development cycles and crew training. This paper documents the final 2012 configuration of the HDU, and discusses some of the testing that took place. Though much of the higher-fidelity functionality has 'graduated' into other NASA programs, as of this writing the HDU, renamed Human Exploration Research Analog (HERA), will continue to be available as a volumetric and operational mockup for NASA Human Research Program (HRP) research from 2013 onward.

  17. LOGICAL REASONING ABILITY AND STUDENT PERFORMANCE IN GENERAL CHEMISTRY.

    PubMed

    Bird, Lillian

    2010-03-01

    Logical reasoning skills of students enrolled in General Chemistry at the University of Puerto Rico in Río Piedras were measured using the Group Assessment of Logical Thinking (GALT) test. The results were used to determine the students' cognitive level (concrete, transitional, formal) as well as their level of performance by logical reasoning mode (mass/volume conservation, proportional reasoning, correlational reasoning, experimental variable control, probabilistic reasoning and combinatorial reasoning). This information was used to identify particular deficiencies and gender effects, and to determine which logical reasoning modes were the best predictors of student performance in the general chemistry course. Statistical tests to analyze the relation between (a) operational level and final grade in both semesters of the course; (b) GALT test results and performance in the ACS General Chemistry Examination; and (c) operational level and student approach (algorithmic or conceptual) towards a test question that may be answered correctly using either strategy, were also performed.

  18. Evaluation of an audience response system in a preclinical operative dentistry course.

    PubMed

    Elashvili, Ana; Denehy, Gerald E; Dawson, Deborah V; Cunningham, Marsha A

    2008-11-01

    Student performance was compared on written and psychomotor skill tests of freshman dental students receiving conventional lectures versus the same lectures containing interactive components using TurningPoint, a wireless audience response system (ARS). The research design was a controlled crossover study with seventy-seven freshman dental students conducted in a preclinical operative dentistry course. Two randomized groups alternated the two study lectures, one with ARS and the other without ARS. Student knowledge retention was measured through written examination using immediate posttest, as well as questions on the unit and final examinations. Psychomotor skill tests were given on both lecture topics. Statistically significant differences indicating superiority of ARS were identified for performance on the immediate posttest and psychomotor skill test only for the lecture "Principles of Dental Bonding." The other examinations/skill testing showed no significant difference. These results indicate that ARS is a promising teaching tool for dental education.

  19. Overview of RICOR's reliability theoretical analysis, accelerated life demonstration test results and verification by field data

    NASA Astrophysics Data System (ADS)

    Vainshtein, Igor; Baruch, Shlomi; Regev, Itai; Segal, Victor; Filis, Avishai; Riabzev, Sergey

    2018-05-01

    The growing demand for EO applications that work around the clock 24hr/7days a week, such as in border surveillance systems, emphasizes the need for a highly reliable cryocooler having increased operational availability and optimized system's Integrated Logistic Support (ILS). In order to meet this need, RICOR developed linear and rotary cryocoolers which achieved successfully this goal. Cryocoolers MTTF was analyzed by theoretical reliability evaluation methods, demonstrated by normal and accelerated life tests at Cryocooler level and finally verified by field data analysis derived from Cryocoolers operating at system level. The following paper reviews theoretical reliability analysis methods together with analyzing reliability test results derived from standard and accelerated life demonstration tests performed at Ricor's advanced reliability laboratory. As a summary for the work process, reliability verification data will be presented as a feedback from fielded systems.

  20. Sweep-twist adaptive rotor blade : final project report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashwill, Thomas D.

    2010-02-01

    Knight & Carver was contracted by Sandia National Laboratories to develop a Sweep Twist Adaptive Rotor (STAR) blade that reduced operating loads, thereby allowing a larger, more productive rotor. The blade design used outer blade sweep to create twist coupling without angled fiber. Knight & Carver successfully designed, fabricated, tested and evaluated STAR prototype blades. Through laboratory and field tests, Knight & Carver showed the STAR blade met the engineering design criteria and economic goals for the program. A STAR prototype was successfully tested in Tehachapi during 2008 and a large data set was collected to support engineering and commercialmore » development of the technology. This report documents the methodology used to develop the STAR blade design and reviews the approach used for laboratory and field testing. The effort demonstrated that STAR technology can provide significantly greater energy capture without higher operating loads on the turbine.« less

  1. LOGICAL REASONING ABILITY AND STUDENT PERFORMANCE IN GENERAL CHEMISTRY

    PubMed Central

    Bird, Lillian

    2010-01-01

    Logical reasoning skills of students enrolled in General Chemistry at the University of Puerto Rico in Río Piedras were measured using the Group Assessment of Logical Thinking (GALT) test. The results were used to determine the students’ cognitive level (concrete, transitional, formal) as well as their level of performance by logical reasoning mode (mass/volume conservation, proportional reasoning, correlational reasoning, experimental variable control, probabilistic reasoning and combinatorial reasoning). This information was used to identify particular deficiencies and gender effects, and to determine which logical reasoning modes were the best predictors of student performance in the general chemistry course. Statistical tests to analyze the relation between (a) operational level and final grade in both semesters of the course; (b) GALT test results and performance in the ACS General Chemistry Examination; and (c) operational level and student approach (algorithmic or conceptual) towards a test question that may be answered correctly using either strategy, were also performed. PMID:21373364

  2. Utility gas turbine combustor viewing system: Volume 2, Engine operating envelope test: Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Morey, W.W.

    1988-12-01

    This report summarizes the development and field testing of a combustor viewing probe (CVP) as a flame diagnostic monitor for utility gas turbine engines. The prototype system is capable of providing a visual record of combustor flame images, recording flame spectral data, analyzing image and spectral data, and diagnosing certain engine malfunctions. The system should provide useful diagnostic information to utility plant operators, and reduced maintenance costs. The field tests demonstrated the ability of the CVP to monitor combustor flame condition and to relate changes in the engine operation with variations in the flame signature. Engine light off, run upmore » to full speed, the addition of load, and the effect of water injection for NO/sub x/ control could easily be identified on the video monitor. The viewing probe was also valuable in identifying hard startups and shutdowns, as well as transient effects that can seriously harm the engine.« less

  3. Improved operator agreement and efficiency using the minimum area contour change method for delineation of hyperintense multiple sclerosis lesions on FLAIR MRI

    PubMed Central

    2013-01-01

    Background Activity of disease in patients with multiple sclerosis (MS) is monitored by detecting and delineating hyper-intense lesions on MRI scans. The Minimum Area Contour Change (MACC) algorithm has been created with two main goals: a) to improve inter-operator agreement on outlining regions of interest (ROIs) and b) to automatically propagate longitudinal ROIs from the baseline scan to a follow-up scan. Methods The MACC algorithm first identifies an outer bound for the solution path, forms a high number of iso-contour curves based on equally spaced contour values, and then selects the best contour value to outline the lesion. The MACC software was tested on a set of 17 FLAIR MRI images evaluated by a pair of human experts and a longitudinal dataset of 12 pairs of T2-weighted Fluid Attenuated Inversion Recovery (FLAIR) images that had lesion analysis ROIs drawn by a single expert operator. Results In the tests where two human experts evaluated the same MRI images, the MACC program demonstrated that it could markedly reduce inter-operator outline error. In the longitudinal part of the study, the MACC program created ROIs on follow-up scans that were in close agreement to the original expert’s ROIs. Finally, in a post-hoc analysis of 424 follow-up scans 91% of propagated MACC were accepted by an expert and only 9% of the final accepted ROIS had to be created or edited by the expert. Conclusion When used with an expert operator's verification of automatically created ROIs, MACC can be used to improve inter- operator agreement and decrease analysis time, which should improve data collected and analyzed in multicenter clinical trials. PMID:24004511

  4. NASA/ARMY/BELL XV-15 Tiltrotor Low-Noise Terminal Area Operations Flight Research Program

    NASA Technical Reports Server (NTRS)

    Edwards, Bryan D.; Conner, David A.; Decker, William A.; Marcolini, Michael A.; Klein, Peter D.

    2001-01-01

    To evaluate the noise reduction potential for tiltrotor aircraft, a series of three XV- 15 acoustic flight tests were conducted over a five-year period by a NASA/Army/Bell Helicopter team. Lower hemispherical noise characteristics for a wide range of steady-state terminal area type operating conditions were measured during the Phase I test and indicated that the takeoff and level flight conditions were not significant contributors to the total noise of tiltrotor operations. Phase I results were also used to design low-noise approach profiles that were tested later during the Phase 2 and Phase 3 tests. These latter phases used large area microphone arrays to directly measure ground noise footprints. Approach profiles emphasized noise reduction while maintaining handling qualities sufficient for tiltrotor commercial passenger ride comfort and flight safety under Instrument Flight Rules (IFR) conditions. This paper will discuss the weather, aircraft, tracking, guidance, and acoustic instrumentation systems, as well as the approach profile design philosophy, and the overall test program philosophy. Acoustic results are presented to document the variation in tiltrotor noise due to changes in operating condition, indicating the potential for significant noise reduction using the unique tiltrotor capability of nacelle tilt. Recommendations are made for a final XV-15 test to define the acoustic benefits of the automated approach capability which has recently been added to this testbed aircraft.

  5. SOFIA: Flying the Telescope

    NASA Technical Reports Server (NTRS)

    Asher, Troy; Cumming, Steve

    2012-01-01

    The Stratospheric Observatory For Infrared Astronomy (SOFIA) is an international cooperative development and operations program between the United States National Aeronautics and Space Administration (NASA) and the German Space Agency, DLR (Deutsches Zentrum fuer Luft-und Raumfahrt). SOFIA is a 2.5 meter, optical/infrared/sub-millimeter telescope mounted in a Boeing model 747SP-21 aircraft and will be used for many basic astronomical observations performed at stratospheric altitudes. It will accommodate installation of different focal plane instruments with in-flight accessibility provided by investigators selected from the international science community. The Facility operational lifetime is planned to be greater than 20 years. This presentation will present the results of developmental testing of SOFIA, including analysis, envelope expansion and the first operational mission. It will describe a brief history of open cavities in flight, how NASA designed and tested SOFIAs cavity, as well as flight test results. It will focus on how the test team achieved key milestones by systematically and efficiently reducing the number of test points to only those absolutely necessary to achieve mission requirements, thereby meeting all requirements and saving the potential loss of program funding. Finally, it will showcase examples of the observatory in action and the first operational mission of the observatory, illustrating the usefulness of the system to the international scientific community. Lessons learned on how to whittle a mountain of test points into a manageable sum will be presented at the conclusion.

  6. The evaluation of a number of prototypes for the free-tip rotor constant-moment controller

    NASA Technical Reports Server (NTRS)

    Young, L. A.

    1986-01-01

    The development of several prototypes of a constant moment controller, a critical component of the free-tip rotor (FTR) concept, is described. Also presented are the experimental results of a whirl test designed to select a final controller configuration to be included in a future wind-tunnel test of this innovative rotor system. A brief explanation of the FTR concept and its history are included. The paper documents the controller design constraints, each prototype's operating principle, the evaluation test, and the individual prototype test results. A recommended design is identified, along with the selection rationale.

  7. Office of the Secretary of Defense Research, Development Test and Evaluation, Development and Test Evaluation, Defense, Director of Operational Test and Evaluation Defense, FY 1994 Budget Estimates, Justification of Estimates Submitted to Congress April 1993

    DTIC Science & Technology

    1993-04-01

    separation capability. o Demonstrate advanced KKVs in the 6-20 KG weight class. o Test planning for SRAM/LEAP and PATRIOT/LEAP integrated technology...packaging techniques to reduce satellite size, weight , power, and total system costs. Further development of these technologies are absolutely 4...1993 o Developed a master plan with a delivery schedule for each light- weight subassembly in the sensor integration payload. o Finalized a contract for

  8. Modulating skylight. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1983-01-01

    A reflector boosted skylight with automatic controls to maintain interior light level and maximize heat capture by opening and closing the insulated reflector, was built and operated. Light levels maintained by the skylight in a small test building were monitored for a one year period and the energy saving computed by comparison to conventional fluorescent lighting.

  9. A DESCRIPTIVE AND COMPARATIVE STUDY OF THE ADMINISTRATIVE PATTERNS OPERATIVE IN SIX SCHOOL HEALTH PROGRAMS. FINAL REPORT.

    ERIC Educational Resources Information Center

    MAYSHARK, CYRUS

    FOUR HYPOTHESES RELATED TO SCHOOL HEALTH PROGRAMS IN SIX SELECTED COMMUNITIES--DENVER (COLORADO), DUVAL COUNTY (FLORIDA), EVANSTON (ILLINOIS), PORTLAND (OREGON), PRINCE GEORGE'S COUNTY (MARYLAND), AND TACOMA (WASHINGTON)--WERE TESTED THROUGH ANALYSIS OF INTERVIEW AND QUESTIONNAIRE RESPONSE DATA. OF 321 QUESTIONNAIRES MAILED TO A SELECTED SAMPLE OF…

  10. IN SITU DESTRUCTION OF CHLORINATED HYDROCARBONS IN GROUNDWATER USING CATALYTIC REDUCTIVE DEHALOGENATION IN A REACTIVE WELL: TESTING AND OPERATIONAL EXPERIENCES. (R825689C093)

    EPA Science Inventory

    The perspectives, information and conclusions conveyed in research project abstracts, progress reports, final reports, journal abstracts and journal publications convey the viewpoints of the principal investigator and may not represent the views and policies of ORD and EPA. Concl...

  11. IN-SITU DESTRUCTION OF CHLORINATED HYDROCARBONS IN GROUNDWATER USING CATALYTIC REDUCTIVE DEHALOGENATION IN A REACTIVE WELL: TESTING AND OPERATIONAL EXPERIENCES. (R825421)

    EPA Science Inventory

    The perspectives, information and conclusions conveyed in research project abstracts, progress reports, final reports, journal abstracts and journal publications convey the viewpoints of the principal investigator and may not represent the views and policies of ORD and EPA. Concl...

  12. IN-SITU DESTRUCTION OF CHLORINATED HYDROCARBONS IN GROUNDWATER USING CATALYTIC REDUCTIVE DEHALOGENATION IN A REACTIVE WELL: TESTING AND OPERATIONAL EXPERIENCES. (R825689C078)

    EPA Science Inventory

    The perspectives, information and conclusions conveyed in research project abstracts, progress reports, final reports, journal abstracts and journal publications convey the viewpoints of the principal investigator and may not represent the views and policies of ORD and EPA. Concl...

  13. Construction, maintenance, and operation of a glacial runway : McMurdo Station, Antarctica

    DOT National Transportation Integrated Search

    1998-03-01

    On February 7, 1994, a C-141 departed Christchurch, New Zealand, and landed on the 3050-m (10,000-ft) Pegasus glacial ice runway, located on the Ross Ice Shelf 13 km (8 mi) south of McMurdo, Antarctica. This event marked the final test for a five-yea...

  14. NOAA announces regulations to protect marine mammals during Navy training

    Science.gov Websites

    testing activities in the Atlantic Ocean and Gulf of Mexico to reduce effects on marine mammals. The Navy (Credit:NOAA) NOAA Fisheries recently made a final determination that the effects of these Navy operations minimize effects on marine mammals, including: establishing marine mammal mitigation zones around each

  15. Final report of the operation and demonstration test of short-range weather forecasting decision support within an advanced transportation weather information system (#Safe)

    DOT National Transportation Integrated Search

    2006-04-01

    The purpose of the Advanced Transportation Weather Information System (ATWIS) was to provide en-route weather forecasts and road condition information to the traveling public across North Dakota and South Dakota. ATWIS was the first system to develop...

  16. 21 CFR 610.14 - Identity.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 7 2011-04-01 2010-04-01 true Identity. 610.14 Section 610.14 Food and Drugs FOOD... BIOLOGICAL PRODUCTS STANDARDS General Provisions § 610.14 Identity. The contents of a final container of each filling of each lot shall be tested for identity after all labeling operations shall have been completed...

  17. 21 CFR 610.14 - Identity.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 7 2014-04-01 2014-04-01 false Identity. 610.14 Section 610.14 Food and Drugs... BIOLOGICAL PRODUCTS STANDARDS General Provisions § 610.14 Identity. The contents of a final container of each filling of each lot shall be tested for identity after all labeling operations shall have been completed...

  18. 21 CFR 610.14 - Identity.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 7 2013-04-01 2013-04-01 false Identity. 610.14 Section 610.14 Food and Drugs... BIOLOGICAL PRODUCTS STANDARDS General Provisions § 610.14 Identity. The contents of a final container of each filling of each lot shall be tested for identity after all labeling operations shall have been completed...

  19. 21 CFR 610.14 - Identity.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 7 2012-04-01 2012-04-01 false Identity. 610.14 Section 610.14 Food and Drugs... BIOLOGICAL PRODUCTS STANDARDS General Provisions § 610.14 Identity. The contents of a final container of each filling of each lot shall be tested for identity after all labeling operations shall have been completed...

  20. LSI (Large Scale Integrated) Design for Testability. Final Report of Design, Demonstration, and Testability Analysis.

    DTIC Science & Technology

    1983-11-01

    compound operations, with status. (h) Pre-programmed CRC and double-precision multiply/divide algo- rithms. (i) Double length accumulator with full...IH1.25 _ - MICROCOP ’ RESOLUTION TEST CHART NATIONAL BUREAU OF STANDARDS-1963-A .4 ’* • • . - . .. •. . . . . . . . . . . . . . • - -. .• ,. o. . . .- "o

  1. SMART operational field test evaluation : public support for bus transit in tri-county area of southeastern Michigan : final report

    DOT National Transportation Integrated Search

    1997-09-01

    Despite ever-decreasing public transit rider-ship in the U.S., public transit continues to enjoy moderate to high amounts of public support, meaning that the public continues to support public expenditures on transit. Indeed, since the 1970s some tra...

  2. Successful Completion of the JWST OGSE2 Cryogenic Test at JSC Chamber-A While Managing Numerous Challenges

    NASA Technical Reports Server (NTRS)

    Park, Sang C.; Brinckerhoff, Pamela; Franck, Randy; Schweickart, Rusty; Thomson, Shaun; Burt, Bill; Ousley, Wes

    2016-01-01

    The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) assembly is the largest optically stable infrared-optimized telescope currently being manufactured and assembled, and scheduled for launch in 2018. The JWST OTE, including the primary mirrors, secondary mirror, and the Aft Optics Subsystems (AOS) are designed to be passively cooled and operate at near 45 degrees Kelvin. Due to the size of its large sunshield in relation to existing test facilities, JWST cannot be optically or thermally tested as a complete observatory-level system at flight temperatures. As a result, the telescope portion along with its instrument complement will be tested as a single unit very late in the program, and on the program schedule critical path. To mitigate schedule risks, a set of 'pathfinder' cryogenic tests will be performed to reduce program risks by demonstrating the optical testing capabilities of the facility, characterizing telescope thermal performance, and allowing project personnel to learn valuable testing lessons off-line. This paper describes the 'pathfinder' cryogenic test program, focusing on the recently completed second test in the series called the Optical Ground Support Equipment 2 (OGSE2) test. The JWST OGSE2 was successfully completed within the allocated project schedule while faced with numerous conflicting thermal requirements during cool-down to the final cryogenic operational temperatures, and during warm-up after the cryo-stable optical tests. The challenges include developing a pre-test cool-down and warm-up profiles without a reliable method to predict the thermal behaviors in a rarified helium environment, and managing the test article hardware safety driven by the project Limits and Constraints (L&C's). Furthermore, OGSE2 test included the time critical Aft Optics Subsystem (AOS), a part of the flight Optical Telescope Element that would need to be placed back in the overall telescope assembly integrations. The OGSE2 test requirements included the strict adherence of the project contamination controls due to the presence of the contamination sensitive flight optical elements. The test operations required close coordination of numerous personnel while they being exposed and trained for the 'final' combined OTE and instrument cryo-test in 2017. This paper will also encompass the OGSE2 thermal data look-back review.

  3. SPOT 4 space magnetic recorder mechanisms

    NASA Technical Reports Server (NTRS)

    Borrien, A.; Vialatoux, E.; Lhermet, J. L.; Didier, A.

    1990-01-01

    The design of the SPOT 4 satellite will be quite different from the previous ones. The design of the new magnetic tape recorder, which was derived from industrial knowledge and mission requirements; the main technical characteristics of the recorder; and the mechanical subsystems of the recorder and their locations and contributions to the final performance are all discussed. The philosophy of the development program, required to achieve the desired performance and reliability for each flight model, is described, and information on the schedule and current development is presented. The components of the tape plate system, (the transmission belts, tape rollers of the recorders, and reel hub ball bearings) which are subjected to heavy mechanical operation, fatigue, and wear in the thermal environment of the mission, are discussed. For each of the components, a description of its function in the recorder is given, as well as the mechanical stress imposed during the various operational phases. The quality testing program, which was used to verify the design safety margins, is described. Finally, the first test results of a functioning model of the flight system are presented.

  4. Superfund record of decision (EPA Region 5): Spickler Landfill, Spencer, WI. (First remedial action), June 1992. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The 10-acre Spickler Landfill site is an inactive municipal and industrial landfill located in Spencer, Marathon County, Wisconsin. The site consists of a mercury brine pit and two fill areas called the Old and New Fill Areas. In 1974, the state ordered the owners of the site to terminate operations and close the landfill. The ROD provides a final remedy for the first operable unit (OU1), which consists of the mercury brine pit, and the landfill. The primary contaminants of concern affecting the soil and sludge are VOCs, including benzene, PCE, toluene, and xylenes; other organics, including pesticides; metals, includingmore » arsenic, chromium, and lead; and other inorganics, including asbestos. The selected remedial action for the operable unit includes solidifying and/or stabilizing wastes in the mercury brine pit based on treatability test results, followed by installing and maintaining an impermeable and a solid waste cap over the New and Old Fill areas.« less

  5. Biological monitoring of Upper Three Runs Creek, Savannah River Plant, Aiken County, South Carolina. Final report on macroinvertebrate stream assessments for F/H area ETF effluent discharge, July 1987--February 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Specht, W.L.

    1991-10-01

    In anticipation of the fall 1988 start up of effluent discharges into Upper Three Creek by the F/H Area Effluent Treatment Facility of the Savannah River Site, Aiken, SC, a two and one half year biological study was initiated in June 1987. Upper Three Runs Creek is an intensively studied fourth order stream known for its high species richness. Designed to assess the potential impact of F?H area effluent on the creek, the study includes qualitative and quantitative macroinvertebrate stream surveys at five sites, chronic toxicity testing of the effluent, water chemistry and bioaccumulation analysis. This final report presents themore » results of both pre-operational and post-operational qualitative and quantitative (artificial substrate) macroinvertebrate studies. Six quantitative and three qualitative studies were conducted prior to the initial release of the F/H ETF effluent and five quantitative and two qualitative studies were conducted post-operationally.« less

  6. Electrical termination techniques

    NASA Technical Reports Server (NTRS)

    Oakey, W. E.; Schleicher, R. R.

    1976-01-01

    A technical review of high reliability electrical terminations for electronic equipment was made. Seven techniques were selected from this review for further investigation, experimental work, and preliminary testing. From the preliminary test results, four techniques were selected for final testing and evaluation. These four were: (1) induction soldering, (2) wire wrap, (3) percussive arc welding, and (4) resistance welding. Of these four, induction soldering was selected as the best technique in terms of minimizing operator errors, controlling temperature and time, minimizing joint contamination, and ultimately producing a reliable, uniform, and reusable electrical termination.

  7. Environmentally Friendly Corrosion Preventative Compounds

    NASA Technical Reports Server (NTRS)

    Calle, Luz Marina; Montgomery, Eliza; Kolody, Mark; Curran, Jerry; Back, Teddy; Balles, Angela

    2012-01-01

    The objective of the Ground Systems Development and Operations Program Environmentally Friendly Corrosion Protective Coatings and Corrosion Preventive Compounds (CPCs) project is to identify, test, and develop qualification criteria for the use of environmentally friendly corrosion protective coatings and CPCs for flight hardware and ground support equipment. This document is the Final Report for Phase I evaluations, which included physical property, corrosion resistance, and NASA spaceport environment compatibility testing and analysis of fifteen CPC types. The CPCs consisted of ten different oily film CPCs and five different wax or grease CPC types. Physical property testing encompassed measuring various properties of the bulk CPCs, while corrosion resistance testing directly measured the ability of each CPC material to protect various metals against corrosion. The NASA spaceport environment compatibility testing included common tests required by NASA-STD-6001, "Flammability, Odor, Offgassing, and Compatibility Requirements and Test Procedures for Materials in Environments that Support Combustion". At the end of Phase I, CPC materials were down-selected for inclusion in the next test phases. This final report includes all data and analysis of results obtained by following the experimental test plan that was developed as part of the project. Highlights of the results are summarized by test criteria type.

  8. Wheeled and Tracked Vehicle Endurance Testing

    DTIC Science & Technology

    2014-10-02

    Vehicle (ATV) 10 10 50 30 Fire Trucks - Crash and Rescue, Brush, Structural 49/56/50 22/16/50 - 29/28/0 a Wheeled Combat 30 40 15 15 Roboticb - 30 50... Wheeled Light W-M = Wheeled Medium W-H = Wheeled Heavy LM-TT = Light/Medium Truck H-TT = Heavy Truck Tractor/Trailer M = Motorcycle FT = Fire ...TYPE Final 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Test Operations Procedure (TOP) 02-2-506A Wheeled and Tracked Vehicle Endurance

  9. F-35 Joint Strike Fighter: Current Outlook Is Improved, but Long-Term Affordability Is a Major Concern

    DTIC Science & Technology

    2013-03-01

    and improvement efforts with DOD, F-35 program, and contractor officials. We toured the aircraft manufacturing plant , obtained production and supply...members of the contractor’s work force and DOD plant representatives. We evaluated DOD’s restructuring actions and impacts on the program, tracked...Testing of the final increment is expected to begin in 2014 and continue through 2016. Initial operational test and evaluation ( IOT &E) is

  10. Apollo experience report: Very high frequency ranging system

    NASA Technical Reports Server (NTRS)

    Panter, W. C.; Shores, P. W.

    1972-01-01

    The history of the Apollo very-high-frequency ranging system development program is presented from the program-planning stage through the final-test and flight-evaluation stages. Block diagrams of the equipment are presented, and a description of the theory of operation is outlined. A sample of the distribution of errors measured in the aircraft-flight test program is included. The report is concluded with guidelines or recommendations for the management of development programs having the same general constraints.

  11. Fabrication and test of a space power boiler feed electromagnetic pump. 3: Endurance and final performance tests

    NASA Technical Reports Server (NTRS)

    Powell, A. H.; Amos, J. C.

    1972-01-01

    A three-phase helical induction electromagnetic pump designed for the boiler feed pump of a potassium Rankine cycle space power system was developed and built. It was mounted in a liquid metal test loop and successfully tested over a range of potassium temperatures from 900 to 1400 F, flow rates from 0.75 to 4.85 lb/sec, developed pressures up to 340 psi, net positive suction head from 1 to 22 psi, and NaK coolant temperatures from 800 to 950 F. Maximum efficiency at design point conditions of 3.25 lb/sec flow rate, 240 psi developed head, 1000 F potassium inlet temperature, and 800 F NaK coolant inlet temperature was 16.3 percent. After the performance tests the pump was operated without any difficulty at design point for 10,000 hours, and then a limited number of repeat performance tests were made. There was no appreciable change in pump performance after 10,000 hours of operation. A supplementary series of tests using the quasi-square wave power output of a dc to three-phase ac inverter showed that the pump would operate without difficulty at a frequency as low as 25 Hz, with little loss in efficiency.

  12. Biodegradation of endocrine disruptors in urban wastewater using Pleurotus ostreatus bioreactor.

    PubMed

    Křesinová, Zdena; Linhartová, Lucie; Filipová, Alena; Ezechiáš, Martin; Mašín, Pavel; Cajthaml, Tomáš

    2018-07-25

    The white rot fungus Pleurotus ostreatus HK 35, which is also an edible industrial mushroom commonly cultivated in farms, was tested in the degradation of typical representatives of endocrine disrupters (EDCs; bisphenol A, estrone, 17β-estradiol, estriol, 17α-ethinylestradiol, triclosan and 4-n-nonylphenol); its degradation efficiency under model laboratory conditions was greater than 90% within 12 days and better than that of another published strain P. ostreatus 3004. A spent mushroom substrate from a local farm was tested for its applicability in various batch and trickle-bed reactors in degrading EDCs in model fortified and real communal wastewater. The reactors were tested under various regimes including a pilot-scale trickle-bed reactor, which was finally tested at a wastewater treatment plant. The result revealed that the spent substrate is an efficient biodegradation agent, where the fungus was usually able to remove about 95% of EDCs together with suppression of the estrogenic activity of the sample. The results showed the fungus was able to operate in the presence of bacterial microflora in wastewater without any substantial negative effects on the degradation abilities. Finally, a pilot-scale trickle-bed reactor was installed in a wastewater treatment plant and successfully operated for 10days, where the bioreactor was able to remove more than 76% of EDCs present in the wastewater. Copyright © 2017 Elsevier B.V. All rights reserved.

  13. Fuel Cell Demonstration Project at a Sunline Transit Agency

    NASA Astrophysics Data System (ADS)

    Hsiung, S.

    2001-09-01

    This is the final report summarizing the Fuel Cell Demonstration Project activities of the XCELLSIS Zebus (zero emissions bus) performance at the SunLine Transit Agency in Thousand Palms, California. Under this demonstration project, SunLine participated with XCELLSIS in the fueling, training, operating, and testing of this prototype fuel cell bus. The report presents a summary of project activities, including the results of the 13-month test of the XCELLSIS Zebus performance at SunLine Transit. This final report includes data relating to Zebus performance, along with the successes achieved beyond the technical realm. The study concludes that the project was very useful in establishing operating parameters and environmental testing in extreme heat conditions and in transferring technology to a transit agency. At the end of the 13-month test period, the Zebus ran flawlessly in the Michelin Challenge Bibendum from Los Angeles to Las Vegas, a 275-mile trek. SunLine refueled the Zebus in transit to Baker, California, 150 miles from its home base. Everyone who encountered or rode the Zebus was impressed with its smoothness, low engine noise, and absence of emissions. The study states that the future for the Zebus looks very bright. Fuel cell projects are anticipated to continue in California and Europe with the introduction new buses equipped with Ballard P5 and other fuel cell engines as early as the first half of 2003.

  14. PFBC HGCU Test Facility. Technical progress report No. 24, Third quarter, CY 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This is the twenty-fourth and final Technical Progress Report submitted to the Department of Energy (DOE) in connection with the cooperative agreement between the DOE and Ohio Power Company for the Tidd PFBC Hot Gas Clean Up Test Facility. This report covers the work completed during the Third Quarter of CY 1995. All activity this quarter was directed toward the completion of the program final report. A draft copy of the final report was forwarded to DOE during this quarter, and DOE submitted their comments on the report to AEPSC. DOE requested that Westinghouse write an appendix to the reportmore » covering the performance of the fail-safe regenerator devices during Tad operation, and Westinghouse subsequently prepared the appendix. Additional DOE comments were incorporated into the report, and it will be issued in camera-ready form by the end of October, 1995, which is the program end date. Appendix 1 presents the results of filter candle posttest examination by Westinghouse performed on selected filter candles following final shutdown of the system.« less

  15. A Final Approach Trajectory Model for Current Operations

    NASA Technical Reports Server (NTRS)

    Gong, Chester; Sadovsky, Alexander

    2010-01-01

    Predicting accurate trajectories with limited intent information is a challenge faced by air traffic management decision support tools in operation today. One such tool is the FAA's Terminal Proximity Alert system which is intended to assist controllers in maintaining safe separation of arrival aircraft during final approach. In an effort to improve the performance of such tools, two final approach trajectory models are proposed; one based on polynomial interpolation, the other on the Fourier transform. These models were tested against actual traffic data and used to study effects of the key final approach trajectory modeling parameters of wind, aircraft type, and weight class, on trajectory prediction accuracy. Using only the limited intent data available to today's ATM system, both the polynomial interpolation and Fourier transform models showed improved trajectory prediction accuracy over a baseline dead reckoning model. Analysis of actual arrival traffic showed that this improved trajectory prediction accuracy leads to improved inter-arrival separation prediction accuracy for longer look ahead times. The difference in mean inter-arrival separation prediction error between the Fourier transform and dead reckoning models was 0.2 nmi for a look ahead time of 120 sec, a 33 percent improvement, with a corresponding 32 percent improvement in standard deviation.

  16. Reverse alignment "mirror image" visualization as a laparoscopic training tool improves task performance.

    PubMed

    Dunnican, Ward J; Singh, T Paul; Ata, Ashar; Bendana, Emma E; Conlee, Thomas D; Dolce, Charles J; Ramakrishnan, Rakesh

    2010-06-01

    Reverse alignment (mirror image) visualization is a disconcerting situation occasionally faced during laparoscopic operations. This occurs when the camera faces back at the surgeon in the opposite direction from which the surgeon's body and instruments are facing. Most surgeons will attempt to optimize trocar and camera placement to avoid this situation. The authors' objective was to determine whether the intentional use of reverse alignment visualization during laparoscopic training would improve performance. A standard box trainer was configured for reverse alignment, and 34 medical students and junior surgical residents were randomized to train with either forward alignment (DIRECT) or reverse alignment (MIRROR) visualization. Enrollees were tested on both modalities before and after a 4-week structured training program specific to their modality. Student's t test was used to determine differences in task performance between the 2 groups. Twenty-one participants completed the study (10 DIRECT, 11 MIRROR). There were no significant differences in performance time between DIRECT or MIRROR participants during forward or reverse alignment initial testing. At final testing, DIRECT participants had improved times only in forward alignment performance; they demonstrated no significant improvement in reverse alignment performance. MIRROR participants had significant time improvement in both forward and reverse alignment performance at final testing. Reverse alignment imaging for laparoscopic training improves task performance for both reverse alignment and forward alignment tasks. This may be translated into improved performance in the operating room when faced with reverse alignment situations. Minimal lab training can account for drastic adaptation to this environment.

  17. High Pressure Angle Gears: Comparison to Typical Gear Designs

    NASA Technical Reports Server (NTRS)

    Handschuh, Robert F.; Zabrajsek, Andrew J.

    2010-01-01

    A preliminary study has been completed to determine the feasibility of using high-pressure angle gears in aeronautic and space applications. Tests were conducted in the NASA Glenn Research Center (GRC) Spur Gear Test Facility at speeds up to 10,000 rpm and 73 N*m (648 in.*lb) for 3.18, 2.12, and 1.59 module gears (8, 12, and 16 diametral pitch gears), all designed to operate in the same test facility. The 3.18 module (8-diametral pitch), 28 tooth, 20deg pressure angle gears are the GRC baseline test specimen. Also, 2.12 module (12-diametral pitch), 42 tooth, 25deg pressure angle gears were tested. Finally 1.59 module (16-diametral pitch), 56 tooth, 35deg pressure angle gears were tested. The high-pressure angle gears were the most efficient when operated in the high-speed aerospace mode (10,000 rpm, lubricated with a synthetic turbine engine oil), and produced the lowest wear rates when tested with a perfluoroether-based grease. The grease tests were conducted at 150 rpm and 71 N*m (630 in.*lb).

  18. Passively operated spool valve for drain-down freeze protection of thermosyphon water heaters. Final technical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1982-04-30

    The work done to extend the existing drain-down valve technology to provide passive drain-down freeze protection for thermosyphon-based solar water heaters is described. The basic design of the existing valve model is that of a spool valve, employing a cylindrical spool which moves axially in a mating cartridge to open and close o-rings at the two operating extremes (drain and operate) to perform the valving function. Three passive actuators to drive the basic valving mechanism were designed, fabricated, and tested. Two piping configurations used to integrate the spool valve with the thermosyphon system are described, as are the passive actuators.more » The three actuator designs are: photovoltaic driven, refrigerant-based bellows, and heat motor cable-drive designs. Costs are compared for the alternative actuator designs, and operating characteristics were examined for the thermosyphon system, including field tests. The market for the valve for thermosyphon systems is then assessed. (LEW)« less

  19. Science Operations Management

    NASA Astrophysics Data System (ADS)

    Squibb, Gael F.

    1984-10-01

    The operation teams for the Infrared Astronomical Satellite (IRAS) included scientists from the IRAS International Science Team. The scientific decisions on an hour-to-hour basis, as well as the long-term strategic decisions, were made by science team members. The IRAS scientists were involved in the analysis of the instrument performance, the analysis of the quality of the data, the decision to reacquire data that was contaminated by radiation effects, the strategy for acquiring the survey data, and the process for using the telescope for additional observations, as well as the processing decisions required to ensure the publication of the final scientific products by end of flight operations plus one year. Early in the project, two science team members were selected to be responsible for the scientific operational decisions. One, located at the operations control center in England, was responsible for the scientific aspects of the satellite operations; the other, located at the scientific processing center in Pasadena, was responsible for the scientific aspects of the processing. These science team members were then responsible for approving the design and test of the tools to support their responsibilities and then, after launch, for using these tools in making their decisions. The ability of the project to generate the final science data products one year after the end of flight operations is due in a large measure to the active participation of the science team members in the operations. This paper presents a summary of the operational experiences gained from this scientific involvement.

  20. James Webb Space Telescope Optical Telescope Element/Integrated Science Instrument Module (OTIS) Status

    NASA Technical Reports Server (NTRS)

    Feinberg, Lee; Voyton, Mark; Lander, Juli; Keski-Kuha, Ritva; Matthews, Gary

    2016-01-01

    The James Webb Space Telescope Optical Telescope Element (OTE) and Integrated Science Instrument Module (ISIM) are integrated together to form the OTIS. Once integrated, the OTIS undergoes primary mirror center of curvature optical tests, electrical and operational tests, acoustics and vibration testing at the Goddard Space Flight Center before being shipped to the Johnson Space Center for cryogenic optical testing of the OTIS. In preparation for the cryogenic optical testing, the JWST project has built a Pathfinder telescope and has completed two Optical Ground System Equipment (OGSE) cryogenic optical tests with the Pathfinder. In this paper, we will summarize optical test results to date and status the final Pathfinder test and the OTIS integration and environmental test preparations

  1. Orbital transfer vehicle oxygen turbopump technology. Volume 2: Nitrogen and ambient oxygen testing

    NASA Technical Reports Server (NTRS)

    Brannam, R. J.; Buckmann, P. S.; Chen, B. H.; Church, S. J.; Sabiers, R. L.

    1990-01-01

    The testing of a rocket engine oxygen turbopump using high pressure ambient temperature nitrogen and oxygen as the turbine drive gas in separate test series is discussed. The pumped fluid was liquid nitrogen or liquid oxygen. The turbopump (TPA) is designed to operate with 400 F oxygen turbine drive gas which will be demonstrated in a subsequent test series. Following bearing tests, the TPA was finish machined (impeller blading and inlet/outlet ports). Testing started on 15 February 1989 and was successfully concluded on 21 March 1989. Testing started using nitrogen to reduce the ignition hazard during initial TPA checkout. The Hydrostatic Bearing System requires a Bearing Pressurization System. Initial testing used a separate bearing supply to prevent a rubbing start. Two test series were successfully completed with the bearing assist supplied only by the pump second stage output which entailed a rubbing start until pump pressure builds up. The final test series used ambient oxygen drive and no external bearing assist. Total operating time was 2268 seconds. There were 14 starts without bearing assist and operating speeds up to 80,000 rpm were logged. Teardown examination showed some smearing of silverplated bearing surfaces but no exposure of the underlying monel material. There was no evidence of melting or oxidation due to the oxygen exposure. The articulating, self-centering hydrostatic bearing exhibited no bearing load or stability problems. The only anomaly was higher than predicted flow losses which were attributed to a faulty ring seal. The TPA will be refurbished prior to the 400 F oxygen test series but its condition is acceptable, as is, for continued operating. This was a highly successful test program.

  2. The Sensor Test for Orion RelNav Risk Mitigation Development Test Objective

    NASA Technical Reports Server (NTRS)

    Christian, John A.; Hinkel, Heather; Maguire, Sean

    2011-01-01

    The Sensor Test for Orion Relative-Navigation Risk Mitigation (STORRM) Development Test Objective (DTO) ew aboard the Space Shuttle Endeavour on STS-134, and was designed to characterize the performance of the ash LIDAR being developed for the Orion. This ash LIDAR, called the Vision Navigation Sensor (VNS), will be the primary navigation instrument used by the Orion vehicle during rendezvous, proximity operations, and docking. This paper provides an overview of the STORRM test objectives and the concept of operations. It continues with a description of the STORRM's major hardware compo nents, which include the VNS and the docking camera. Next, an overview of crew and analyst training activities will describe how the STORRM team prepared for flight. Then an overview of how insight data collection and analysis actually went is presented. Key ndings and results from this project are summarized, including a description of "truth" data. Finally, the paper concludes with lessons learned from the STORRM DTO.

  3. Destructive Evaluation of a Xenon Hollow Cathode after a 28,000 Hour Life Test

    NASA Technical Reports Server (NTRS)

    Sarver-Verhey, Timothy R.

    1998-01-01

    International Space Station (ISS) plasma contactor system requires a hollow cathode assembly (HCA) with a lifetime of at least 18,000 hours. In order to demonstrate the lifetime capability of the HCA, a series of hollow cathode wear tests was performed which included a life test operated at the maximum current of the HCA. This test sought to verify hollow cathode lifetime capability and contamination control protocols. This hollow cathode accumulated 27,800 hours of operation before it failed during a restart attempt. The cathode was subsequently destructively analyzed in order to determine the failure mechanism. Microscopic examination of the cathode interior determined that relatively small changes in the cathode physical geometry had occurred and barium tungstates, which are known to limit the emission process, had formed over a majority of the electron emitter surface. Because the final state of the insert was consistent with expected impregnate chemistry, the hollow cathode was believed to have reached the end of its usable life under the test conditions.

  4. Study Program to Determine the Acceleration Environment Capability of the GG159C Gas- Bearing Spinmotor Final Report

    NASA Technical Reports Server (NTRS)

    Erickson, G. J.

    1964-01-01

    The goal of this contract was to determine the g environment under which the GC159C Gas-Bearing Spinmotor (GBSM) could reliably operate. This was fulfilled by building and testing of four GBSM's, a test fixture, and a "dummy" gyro. The test program was divided into two phases when a gas bearing improvement was required to withstand JPL shock requirement of 200 g. Phase I determined existing g capabilities and performance of the GC159C GBSM and gimbal-case structure. Phase II increased GBSM capability to meet required JPL g environments. Life tests were run on two GBSM's which were shocked at a high level to obtain bearing contact while rotating at their operating speed of 23,000 rpm. A third (nonoperating) GBSM was exposed to JPL maximum shock levels, and a fourth (nonoperating) GBSM was exposed to random vibration. Both nonoperating GBSM's were then subjected to life testing.

  5. High Voltage Insulation Technology

    NASA Astrophysics Data System (ADS)

    Scherb, V.; Rogalla, K.; Gollor, M.

    2008-09-01

    In preparation of new Electronic Power Conditioners (EPC's) for Travelling Wave Tub Amplifiers (TWTA's) on telecom satellites a study for the development of new high voltage insulation technology is performed. The initiative is mandatory to allow compact designs and to enable higher operating voltages. In a first task a market analysis was performed, comparing different materials with respect to their properties and processes. A hierarchy of selection criteria was established and finally five material candidates (4 Epoxy resins and 1 Polyurethane resin) were selected to be further investigated in the test program. Samples for the test program were designed to represent core elements of an EPC, the high voltage transformer and Printed Circuit Boards of the high voltage section. All five materials were assessed in the practical work flow of the potting process and electrical, mechanical, thermal and lifetime testing was performed. Although the lifetime tests results were overlayed by a larges scatter, finally two candidates have been identified for use in a subsequent qualification program. This activity forms part of element 5 of the ESA ARTES Programme.

  6. Preparing GMAT for Operational Maneuver Planning of the Advanced Composition Explorer (ACE)

    NASA Technical Reports Server (NTRS)

    Qureshi, Rizwan Hamid; Hughes, Steven P.

    2014-01-01

    The General Mission Analysis Tool (GMAT) is an open-source space mission design, analysis and trajectory optimization tool. GMAT is developed by a team of NASA, private industry, public and private contributors. GMAT is designed to model, optimize and estimate spacecraft trajectories in flight regimes ranging from low Earth orbit to lunar applications, interplanetary trajectories and other deep space missions. GMAT has also been flight qualified to support operational maneuver planning for the Advanced Composition Explorer (ACE) mission. ACE was launched in August, 1997 and is orbiting the Sun-Earth L1 libration point. The primary science objective of ACE is to study the composition of both the solar wind and the galactic cosmic rays. Operational orbit determination, maneuver operations and product generation for ACE are conducted by NASA Goddard Space Flight Center (GSFC) Flight Dynamics Facility (FDF). This paper discusses the entire engineering lifecycle and major operational certification milestones that GMAT successfully completed to obtain operational certification for the ACE mission. Operational certification milestones such as gathering of the requirements for ACE operational maneuver planning, gap analysis, test plans and procedures development, system design, pre-shadow operations, training to FDF ACE maneuver planners, shadow operations, Test Readiness Review (TRR) and finally Operational Readiness Review (ORR) are discussed. These efforts have demonstrated that GMAT is flight quality software ready to support ACE mission operations in the FDF.

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Melody, M.

    Waste Technologies Industries (WTI; East Liverpool, Ohio) is trying to wing what it hopes will be its final battle in a 13-year, $160 million war with the government, and community and environmental groups. The company since 1980 has sought EPA approval to operate a hazardous waste incinerator in East Liverpool, Ohio. WTI late last year conducted a pre-test burn, or shakedown, during which the incinerator burned certain types of hazardous waste. The test demonstrates the incinerator's performance under normal operating conditions, Regulatory authorities, including EPA and the Ohio Environmental Protection Agency (OEPA), monitored activity during the shakedown, which was limitedmore » to 720 hours of operation. In accordance with RCRA requirements, the company in March conducted a trial burn to demonstrate that the incinerator meets permit standards. WTI's permit specifies three performance parameters the incinerator must meet -- particulate and hydrogen chloride emissions limits, and destruction removal efficiencies (DREs).« less

  8. Experimental study on hydraulic characteristic around trash rack of a pumping station

    NASA Astrophysics Data System (ADS)

    Zhou, MinZhe; Li, TongChun; Lin, XiangYang; Liu, XiaoQing; Ding, Yuan; Liu, GuangYuan

    2017-11-01

    This paper focuses on flow pattern around trash rack of intake of a pumping station project. This pumping station undertake the task of supplying up to 3,500,000 m3 water per day for a megacity. Considering the large flow rate, high lift, multi-pipe supply and long-time operation in this water conveyance pumping station, we built a physical model test to measure the flow velocity and observe the flow pattern to verify the reasonability of preliminary design. In this test, we set 3 layers of current meters around each trash rack of intake in reservoir to collect the flow velocity. Furthermore, we design 2 operating conditions of 9 pumps to observe the change of flow pattern. Finally, we found the velocity data were in a normal range under 2 different operating conditions of the 9 pump units.

  9. Grumman Windstream 25 wind turbine generator. Final test report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sexton, J.H.

    1980-03-01

    The Grumman Windstream 25 Wind Turbine Generator (WTG) tested at the Rocky Flats Small Wind Systems Test Center (WSTC) was one of nineteen Windstream 25's manufactured by Grumman Energy Systems, Inc. The machine was considered a first generation prototype and is no longer being produced. While being tested at the WSTC, the Windstream 25 was still in a developmental stage, and operational problems were experienced during its testing period. It is important to underscore, however, that problems encountered during testing of the machine created valuable gains in experience and data for both Rocky Flats and Grumman personnel. It is believedmore » these gains have contributed significantly to further development of Grumman WTG's.« less

  10. Method for Controlling Space Transportation System Life Cycle Costs

    NASA Technical Reports Server (NTRS)

    McCleskey, Carey M.; Bartine, David E.

    2006-01-01

    A structured, disciplined methodology is required to control major cost-influencing metrics of space transportation systems during design and continuing through the test and operations phases. This paper proposes controlling key space system design metrics that specifically influence life cycle costs. These are inclusive of flight and ground operations, test, and manufacturing and infrastructure. The proposed technique builds on today's configuration and mass properties control techniques and takes on all the characteristics of a classical control system. While the paper does not lay out a complete math model, key elements of the proposed methodology are explored and explained with both historical and contemporary examples. Finally, the paper encourages modular design approaches and technology investments compatible with the proposed method.

  11. Slug Test Characterization Results for Multi-Test/Depth Intervals Conducted During the Drilling of CERCLA Operable Unit OU UP-1 Wells 299-W19-48, 699-30-66, and 699-36-70B

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Spane, Frank A.; Newcomer, Darrell R.

    2010-06-15

    This report presents test descriptions and analysis results for multiple, stress-level slug tests that were performed at selected test/depth intervals within three Operable Unit (OU) UP-1 wells: 299-W19-48 (C4300/Well K), 699-30-66 (C4298/Well R), and 699-36-70B (C4299/Well P). These wells are located within, adjacent to, and to the southeast of the Hanford Site 200-West Area. The test intervals were characterized as the individual boreholes were advanced to their final drill depths. The primary objective of the hydrologic tests was to provide information pertaining to the areal variability and vertical distribution of hydraulic conductivity with depth at these locations within the OUmore » UP-1 area. This type of characterization information is important for predicting/simulating contaminant migration (i.e., numerical flow/transport modeling) and designing proper monitor well strategies for OU and Waste Management Area locations.« less

  12. Slug Test Characterization Results for Multi-Test/Depth Intervals Conducted During the Drilling of CERCLA Operable Unit OU ZP-1 Wells 299-W11-43, 299-W15-50, and 299-W18-16

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Spane, Frank A.; Newcomer, Darrell R.

    2010-06-21

    The following report presents test descriptions and analysis results for multiple, stress level slug tests that were performed at selected test/depth intervals within three Operable Unit (OU) ZP-1 wells: 299-W11-43 (C4694/Well H), 299-W15-50 (C4302/Well E), and 299-W18-16 (C4303/Well D). These wells are located within south-central region of the Hanford Site 200-West Area (Figure 1.1). The test intervals were characterized as the individual boreholes were advanced to their final drill depths. The primary objective of the hydrologic tests was to provide information pertaining to the areal variability and vertical distribution of hydraulic conductivity with depth at these locations within the OUmore » ZP-1 area. This type of characterization information is important for predicting/simulating contaminant migration (i.e., numerical flow/transport modeling) and designing proper monitor well strategies for OU and Waste Management Area locations.« less

  13. Safely Enabling UAS Operations in Low-Altitude Airspace

    NASA Technical Reports Server (NTRS)

    Kopardekar, Parimal

    2017-01-01

    NASA is developing a system to safely enable low altitude unmanned aerial system (UAS) operations. The system is referred to as UAS Traffic Management (UTM). The UTM will safely enable a variety of business models and multiple operations in the same airspace. The UTM will provide services such as airspace configuration and geo-fencing, weather and wind integration, demand-capacity imbalance management, and separation management, and contingency management. The UTM research and development has been conducted in collaboration with many in industry, academia, and government. The UTM system will evolve through four builds. Each build will be collaboratively tested with partners. The final prototype will be available for persistent daily use of UAS operations beyond visual line of sight (BVLOS).

  14. 78 FR 285 - Supplemental Final Environmental Impact Statement for Healy Power Generation Unit #2, Healy, AK

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-03

    ... Valley Electric Association (GVEA) since 1967. Healy Unit 2 is a 50 MW coal- fired steam generator owned by AIDEA, which underwent test operation for two years as part of DOE's Clean Coal Technology Program... RUS. The RUS Electric Program is authorized to make loans and loan guarantees that finance the...

  15. An Operationally Responsive Space Architecture for 2025

    DTIC Science & Technology

    2008-06-22

    Organizational Relationships, Asset Loss Mitigation, Availability, Flexibility, and Streamlined Acquisition Processes . These pillars allowed the solutions...were considered. Analysis was further supported by a performance versus cost process which provided a final test of solution feasibility. Relative cost...Availability, Flexibility, and Streamlined Acquisition Processes . These pillars allowed the solutions, material and non-material, to be organized for

  16. Development of USPS Laboratory and pilot-scale testing protocols

    Treesearch

    Carl Houtman; Nancy Ross Sutherland; David Bormett; Donald Donermeyer

    2000-01-01

    The ultimate goal of the US Postal Service (USPS) Environmentally Benign Stamp Program is to develop stamp adhesives that can be removed by unit operations found in recycling mills. The maintenance of final product quality specifications for a recycling mill while loading the feedstock with a significant quantity of adhesive is the criterion for success of this program...

  17. Effect of a Predictor Instrument on Learning to Land a Simulated Jet Trainer. Final Report.

    ERIC Educational Resources Information Center

    Smith, Russell L.; And Others

    The study investigates the potential utility of a predictor instrument in the training of manual control operators in aircraft simulators. Various predictor display design configurations were presented to subjects during training trials on an aircraft approach to landing task. Subsequently, subjects were tested on trials devoid of the predictor…

  18. Advanced Stirling Convertor Dynamic Test Approach and Results

    NASA Technical Reports Server (NTRS)

    Meer, David W.; Hill, Dennis; Ursic, Joseph

    2009-01-01

    The U.S. Department of Energy (DOE), Lockheed Martin (LM), and NASA Glenn Research Center (GRC) have been developing the Advanced Stirling Radioisotope Generator (ASRG) for use as a power system for space science missions. As part of the extended operation testing of this power system, the Advanced Stirling Converters (ASC) at NASA John H. Glenn Research Center undergo a vibration test sequence intended to simulate the vibration history of an ASC used in an ASRG for a space mission. This sequence includes testing at Workmanship and Flight Acceptance levels interspersed with periods of extended operation to simulate pre and post fueling. The final step in the test sequence utilizes additional testing at Flight Acceptance levels to simulate launch. To better replicate the acceleration profile seen by an ASC incorporated into an ASRG, the input spectra used in testing the convertors was modified based on dynamic testing of the ASRG Engineering Unit ( ASRG-EU) at Lockheed Martin. This paper presents the vibration test plan for current and future ASC units, including the modified input spectra, and the results of recent tests using these spectra. The test results include data from several accelerometers mounted on the convertors as well as the piston position and output power variables.

  19. Life Test Approach for Refractory Metal/Sodium Heat Pipes

    NASA Technical Reports Server (NTRS)

    Martin, James J.; Reid, Robert S.

    2006-01-01

    Heat pipe life tests described in the literature have seldom been conducted on a systematic basis. Typically one or more heat pipes are built and tested for an extended period at a single temperature with simple condenser loading. This paper describes an approach to generate carefully controlled data that can conclusively establish heat pipe operating life with material-fluid combinations capable of extended operation. Approximately 10 years of operational life might be compressed into 3 years of laboratory testing through a combination of increased temperature and mass fluence. Two specific test series have been identified and include: investigation of long term corrosion rates based on the guidelines contained in ASTM G-68-80 (using 7 heat pipes); and investigation of corrosion trends in a cross correlation sequence at various temperatures and mass fluences based on a central composite test design (using 9 heat pipes). The heat pipes selected for demonstration purposes are fabricated from a Mo-44.5%Re alloy with a length of 0.3 meters and a diameter of 1.59 cm(to conserve material) with a condenser to evaporator length ratio of approximately 3. The wick is a crescent annular design formed from 400-mesh Mo-Re alloy material hot isostatically pressed to produce a final wick core of 20 microns or less.

  20. KSC-2009-2212

    NASA Image and Video Library

    2009-03-19

    CAPE CANAVERAL, Fla. – The NASA Railroad makes the exchange with the Florida East Coast Railway cars carrying the booster segments for the Ares I-X test rocket. The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida. The segments will be delivered to the Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Kim Shiflett

  1. SNAP-8 electrical generating system development program

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The SNAP-8 program has developed the technology base for one class of multikilowatt dynamic space power systems. Electrical power is generated by a turbine-alternator in a mercury Rankine-cycle loop to which heat is transferred and removed by means of sodium-potassium eutectic alloy subsystems. Final system overall criteria include a five-year operating life, restartability, man rating, and deliverable power in the 90 kWe range. The basic technology was demonstrated by more than 400,000 hours of major component endurance testing and numerous startup and shutdown cycles. A test system, comprised of developed components, delivered up to 35 kWe for a period exceeding 12,000 hours. The SNAP-8 system baseline is considered to have achieved a level of technology suitable for final application development for long-term multikilowatt space missions.

  2. Construction of a survey to assess workload and fatigue among AMT operators in Mexico.

    PubMed

    Hernández Arellano, Juan Luis; Ibarra Mejía, Gabriel; Serratos Pérez, J Nieves; García Alcaraz, Jorge Luis; Brunette, María Julia

    2012-01-01

    Operators of machinery classified as Advanced Manufacturing Technology (AMT) are exposed to high levels of workload and fatigue. However, only few studies have been conducted on this topic in Hispanic-American countries workers. Several instruments be used to assess workload and fatigue; however, only few of them have been adapted to Spanish language. This paper reports on the development and validity testing of a survey instrument in Spanish, aiming to subjectively assess workload and fatigue among AMT operators in Mexico. After an exhaustive literature review in search of already available measurement instruments, they were adapted for content and later translated into Spanish; a pilot test was conducted to evaluate validity and reliability; afterwards appropriate modifications were made to the testing instruments. Final version of the instrument was applied to a group of 121 operators of CNC lathes. Reliability was analyzed using KMO and Cronbach alpha indices. For the assessment of workload, both NASA-TLX and ISTAS 21 methods were incorporated to the survey instrument. As for fatigue assessment tools, these were SOFI-S, FAS and OFER questionnaires. RESULTS show KMO value and Cronbach alpha above 0.6.Conclusions. The survey instrument as designed, allows the collection of reliable and valid data regarding workload and fatigue among AMT operators in Mexico.

  3. SIGHT - A balloon borne hard X-ray telescope

    NASA Technical Reports Server (NTRS)

    Wilkerson, J.; Edberg, T. K.; Hurley, K.; Lin, R. P.; Parsons, A.

    1991-01-01

    The authors report on progress toward developing a large-area, high-pressure xenon gas scintillator for use in hard X-ray astrophysics. Proof test results for a low-mass pressure vessel are presented. The design of a high-voltage multiplier board operating inside the scintillation chamber is discussed. The development of tetrakis-dimethylamine-thylene (TMAE)-based proportional tubes for detecting primary scintillation in the xenon is described. Finally, Monte Carlo tests of a scheme to use conventional photomultiplier tubes are discussed.

  4. Develop real-time dosimetry concepts and instrumentation for long term missions

    NASA Technical Reports Server (NTRS)

    Braby, L. A.

    1982-01-01

    The development of a rugged portable instrument to evaluate dose and dose equivalent is described. A tissue-equivalent proportional counter simulating a 2 micrometer spherical tissue volume was operated satisfactorily for over a year. The basic elements of the electronic system were designed and tested. And finally, the most suitable mathematical technique for evaluating dose equivalent with a portable instrument was selected. Design and fabrication of a portable prototype, based on the previously tested circuits, is underway.

  5. Student Drop Tower Competitions: Dropping In a Microgravity Environment (DIME) and What If No Gravity? (WING)

    NASA Technical Reports Server (NTRS)

    Hall, Nancy R.; Stocker, Dennis P.; DeLombard, Richard

    2011-01-01

    This paper describes two student competition programs that allow student teams to conceive a science or engineering experiment for a microgravity environment. Selected teams design and build their experimental hardware, conduct baseline tests, and ship their experiment to NASA where it is operated in the 2.2 Second Drop Tower. The hardware and acquired data is provided to the teams after the tests are conducted so that the teams can prepare their final reports about their findings.

  6. KSC-05PD-0502B

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. At Astrotech in Titusville, Fla., Boeing technicians hold guide wires attached to the crane lifting the GOES-N satellite. Since its arrival on March 11, the satellite has been undergoing final testing by Boeing Satellite Systems of the imaging system, instrumentation, communications and power systems. Geostationary Operational Environmental Satellites (GOES) are sponsored by NASAs Goddard Space Flight Center and the National Oceanic and Atmospheric Administration. GOES-N is targeted to launch May 4 onboard a Boeing expendable launch vehicle Delta IV (4,2) with a 3-burn second stage operation.

  7. Advances in Strapdown Inertial Systems. Lecture Series Held in Athens, Greece on 14-15 May 1984, in Rome, Italy on 17-18 May 1984 and in Copenhagen, Denmark on 21-22 May 1984

    DTIC Science & Technology

    1984-04-01

    software are required. Ported air cooling is provided in accordan-4 oith WKIM 600 Level 2 and Adequately supports the pow. dissipation (approxiimately 100... software multiplication with simple shifting operations in order to optimize operating speed. Finally, program development software for microprocessors...requiremuents and that the software was exhaustively verified and validated prior to initiation of flight testing will be describ- ed. A special flight

  8. Solar heating and cooling system installed at RKL Controls Company, Lumberton, New Jersey

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The final results of the design and operation of a computer controlled solar heated and cooled 40,000 square foot manufacturing building, sales office, and computer control center/display room are summarized. The system description, test data, major problems and resolutions, performance, operation and maintenance manual, equipment manufacturers' literature, and as-built drawings are presented. The solar system is composed of 6,000 square feet of flat plate collectors, external above ground storage subsystem, controls, absorption chiller, heat recovery, and a cooling tower.

  9. 76 FR 77996 - Notice of Issuance of Final Air Permits for Eni US Operating Co., Inc. and Port Dolphin Energy, LLC.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-15

    ... Final Air Permits for Eni US Operating Co., Inc. and Port Dolphin Energy, LLC. AGENCY: Environmental... 27, 2011, the EPA issued a final Outer Continental Shelf (OCS) air permit for Eni US Operating Inc. (Eni). This permit became effective on November 28, 2011. In addition, the EPA issued a final...

  10. Liquid Oxygen Propellant Densification Production and Performance Test Results With a Large-Scale Flight-Weight Propellant Tank for the X33 RLV

    NASA Technical Reports Server (NTRS)

    Tomsik, Thomas M.; Meyer, Michael L.

    2010-01-01

    This paper describes in-detail a test program that was initiated at the Glenn Research Center (GRC) involving the cryogenic densification of liquid oxygen (LO2). A large scale LO2 propellant densification system rated for 200 gpm and sized for the X-33 LO2 propellant tank, was designed, fabricated and tested at the GRC. Multiple objectives of the test program included validation of LO2 production unit hardware and characterization of densifier performance at design and transient conditions. First, performance data is presented for an initial series of LO2 densifier screening and check-out tests using densified liquid nitrogen. The second series of tests show performance data collected during LO2 densifier test operations with liquid oxygen as the densified product fluid. An overview of LO2 X-33 tanking operations and load tests with the 20,000 gallon Structural Test Article (STA) are described. Tank loading testing and the thermal stratification that occurs inside of a flight-weight launch vehicle propellant tank were investigated. These operations involved a closed-loop recirculation process of LO2 flow through the densifier and then back into the STA. Finally, in excess of 200,000 gallons of densified LO2 at 120 oR was produced with the propellant densification unit during the demonstration program, an achievement that s never been done before in the realm of large-scale cryogenic tests.

  11. Undergraduate surgical nursing preparation and guided operating room experience: A quantitative analysis.

    PubMed

    Foran, Paula

    2016-01-01

    The aim of this research was to determine if guided operating theatre experience in the undergraduate nursing curricula enhanced surgical knowledge and understanding of nursing care provided outside this specialist area in the pre- and post-operative surgical wards. Using quantitative analyses, undergraduate nurses were knowledge tested on areas of pre- and post-operative surgical nursing in their final semester of study. As much learning occurs in nurses' first year of practice, participants were re-tested again after their Graduate Nurse Program/Preceptorship year. Participants' results were compared to the model of operating room education they had participated in to determine if there was a relationship between the type of theatre education they experienced (if any) and their knowledge of surgical ward nursing. Findings revealed undergraduates nurses receiving guided operating theatre experience had a 76% pass rate compared to 56% with non-guided or no experience (p < 0.001). Graduates with guided operating theatre experience as undergraduates or graduate nurses achieved a 100% pass rate compared to 53% with non-guided or no experience (p < 0.001). The research informs us that undergraduate nurses achieve greater learning about surgical ward nursing via guided operating room experience as opposed to surgical ward nursing experience alone. Copyright © 2015 Elsevier Ltd. All rights reserved.

  12. Engineering scale demonstration of a prospective Cast Stone process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cozzi, A.; Fowley, M.; Hansen, E.

    2014-09-30

    This report documents an engineering-scale demonstration with non-radioactive simulants that was performed at SRNL using the Scaled Continuous Processing Facility (SCPF) to fill an 8.5 ft container with simulated Cast Stone grout. The Cast Stone formulation was chosen from the previous screening tests. Legacy salt solution from previous Hanford salt waste testing was adjusted to correspond to the average composition generated from the Hanford Tank Waste Operation Simulator (HTWOS). The dry blend materials, ordinary portland cement (OPC), Class F fly ash, and ground granulated blast furnace slag (GGBFS or BFS), were obtained from Lafarge North America in Pasco, WA. Overmore » three days, the SCPF was used to fill a 1600 gallon container, staged outside the facility, with simulated Cast Stone grout. The container, staged outside the building approximately 60 ft from the SCPF, was instrumented with x-, y-, and z-axis thermocouples to monitor curing temperature. The container was also fitted with two formed core sampling vials. For the operation, the targeted grout production rate was 1.5 gpm. This required a salt solution flow rate of approximately 1 gpm and a premix feed rate of approximately 580 lb/h. During the final day of operation, the dry feed rate was increased to evaluate the ability of the system to handle increased throughput. Although non-steady state operational periods created free surface liquids, no bleed water was observed either before or after operations. The final surface slope at a fill height of 39.5 inches was 1-1.5 inches across the 8.5 foot diameter container, highest at the final fill point and lowest diametrically opposed to the fill point. During processing, grout was collected in cylindrical containers from both the mixer discharge and the discharge into the container. These samples were stored in a humid environment either in a closed box proximal to the container or inside the laboratory. Additional samples collected at these sampling points were analyzed for rheological properties and density. Both the rheological properties (plastic viscosity and yield strength) and density were consistent with previous and later SCPF runs.« less

  13. Test of a 250 kVA Battery-Inverter System Micro-Grid: Cooperative Research and Development Final Report, CRADA Number CRD-11-460

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kramer, William; Martin, Greg; Lundstrom, Blake

    Portland General Electric (PGE) is installing a 5-megawatt (MW) lithium-ion-based battery-inverter system (BIS) in Salem, Oregon, as part of the Pacific Northwest Smart Grid Demonstration Project. NREL will assist PGE in testing a 250-kilovolt-ampere (kVA) portion of the BIS in order to verify correct operation and minimize risk to subsequent demonstrations. In this project NREL will providetechnical support for the 250-kVA test and will work with PGE to write a test plan and evaluate the system in the lab before deployment in the field.

  14. Development and testing of the infrared radiometer for the Mariner Venus/Mercury 1973 spacecraft

    NASA Technical Reports Server (NTRS)

    Clarke, T. C.

    1975-01-01

    The science objectives, development history, functional description, and testing of the Mariner Venus/Mercury 1973 infrared radiometer are discussed. Included in the functional description section is a thorough discussion of the IRR optical system, electronic operation, and thermal control. Signal development and its conversion to engineering units is traced, starting with the radiant space object, passing through the IRR optics and electronics, and culminating with data number development and interpretation. The test program section includes discussion of IRR calibration and alignment verification. Finally, the problems and failures encountered by the IRR during the period of its development and testing are reviewed.

  15. Cognitive performance deficits in a simulated climb of Mount Everest - Operation Everest II

    NASA Technical Reports Server (NTRS)

    Kennedy, R. S.; Dunlap, W. P.; Banderet, L. E.; Smith, M. G.; Houston, C. S.

    1989-01-01

    Cognitive function at simulated altitude was investigated in a repeated-measures within-subject study of performance by seven volunteers in a hypobaric chamber, in which atmospheric pressure was systematically lowered over a period of 40 d to finally reach a pressure equivalent to 8845 m, the approximate height of Mount Everest. The automated performance test system employed compact computer design; automated test administrations, data storage, and retrieval; psychometric properties of stability and reliability; and factorial richness. Significant impairments of cognitive function were seen for three of the five tests in the battery; on two tests, grammatical reasoning and pattern comparison, every subject showed a substantial decrement.

  16. Labyrinth seal testing for lift fan engines

    NASA Technical Reports Server (NTRS)

    Dobek, L. J.

    1973-01-01

    An abradable buffered labyrinth seal for the control of turbine gas path leakage in a tip-turbine driven lift fan was designed, tested, and analyzed. The seal configuration was not designed to operate in any specific location but was sized to be evaluated in an existing test rig. The final sealing diameter selected was 28 inches. Results of testing indicate that the flow equations predicted seal air flows consistent with measured values. Excellent sealing characteristics of the abradable coating on the stator land were demonstrated when a substantial seal penetration of .030 inch into the land surface was encountered without appreciable wear on the labyrinth knife edges.

  17. A Challenging Trio in Space 'Routine' Operations of the Swarm Satellite Constellation

    NASA Astrophysics Data System (ADS)

    Diekmann, Frank-Jurgen; Clerigo, Ignacio; Albini, Giuseppe; Maleville, Laurent; Neto, Alessandro; Patterson, David; Nino, Ana Piris; Sieg, Detlef

    2016-08-01

    Swarm is the first ESA Earth Observation Mission with three satellites flying in a semi-controlled constellation. The trio is operated from ESA's satellite control centre ESOC in Darmstadt, Germany. The Swarm Flight Operations Segment consists of the typical elements of a satellite control system at ESOC, but had to be carefully tailored for this innovative mission. The main challenge was the multi-satellite system of Swarm, which necessitated the development of a Mission Control System with a multi-domain functionality, both in hardware and software and covering real-time and backup domains. This was driven by the need for extreme flexibility for constellation operations and parallel activities.The three months of commissioning in 2014 were characterized by a very tight and dynamically changing schedule of activities. All operational issues could be solved during that time, including the challenging orbit acquisition phase to achieve the final constellation.Although the formal spacecraft commissioning phase was concluded in spring 2014, the investigations for some payload instruments continue even today. The Electrical Field Instruments are for instance still being tested in order to characterize and improve science data quality. Various test phases also became necessary for the Accelerometers on the Swarm satellites. In order to improve the performance of the GPS Receivers for better scientific exploitation and to minimize the failures due to loss of synchronization, a number of parameter changes were commanded via on-board patches.Finally, to minimize the impact on operations, a new strategy had to be implemented to handle single/multi bit errors in the on-board mass Memories, defining when to ignore and when to restore the memory via a re-initialisation.The poster presentation summarizes the Swarm specific ground segment elements of the FOS and explains some of the extended payload commissioning operations, turning Swarm into a most demanding and challenging mission for the Flight Control Team at ESOC.

  18. Robotic Assisted Microsurgery - RAMS FY'97

    NASA Technical Reports Server (NTRS)

    1997-01-01

    JPL and Microdexterity Systems collaborated to develop new surgical capabilities. They developed a Robot Assisted Microsurgery (RAM) tool for surgeons to use for operating on the eye, ear, brain, and blood vessels with unprecedented dexterity. A surgeon can hold the surgical instrument with motions of 6 degrees of freedom with an accuracy of 25 microns in a 70 cu cm workspace. In 1996 a demonstration was performed to remove a microscopic particle from a simulated eyeball. In 1997, tests were performed at UCLA to compare telerobotics with mechanical operations. In 5 out of 7 tests, the RAM tool performed with a significant improvement of preciseness over mechanical operation. New design features include: (1) amplified forced feedback; (2) simultaneous slave robot instrumentation; (3) index control switch on master handle; and (4) tool control switches. Upgrades include: (1) increase in computational power; and (2) installation of hard disk memory storage device for independent operation and independent operation of forceps. In 1997 a final demonstration was performed using 2 telerobotics simultaneously in a microsurgery suture procedure to close a slit in a thin sheet of latex rubber which extended the capabilities of microsurgery procedures. After completing trials and demonstrations for the FDA the potential benefits for thousands of operations will be exposed.

  19. Development of a subway operation incident delay model using accelerated failure time approaches.

    PubMed

    Weng, Jinxian; Zheng, Yang; Yan, Xuedong; Meng, Qiang

    2014-12-01

    This study aims to develop a subway operational incident delay model using the parametric accelerated time failure (AFT) approach. Six parametric AFT models including the log-logistic, lognormal and Weibull models, with fixed and random parameters are built based on the Hong Kong subway operation incident data from 2005 to 2012, respectively. In addition, the Weibull model with gamma heterogeneity is also considered to compare the model performance. The goodness-of-fit test results show that the log-logistic AFT model with random parameters is most suitable for estimating the subway incident delay. First, the results show that a longer subway operation incident delay is highly correlated with the following factors: power cable failure, signal cable failure, turnout communication disruption and crashes involving a casualty. Vehicle failure makes the least impact on the increment of subway operation incident delay. According to these results, several possible measures, such as the use of short-distance and wireless communication technology (e.g., Wifi and Zigbee) are suggested to shorten the delay caused by subway operation incidents. Finally, the temporal transferability test results show that the developed log-logistic AFT model with random parameters is stable over time. Copyright © 2014 Elsevier Ltd. All rights reserved.

  20. PILOT-SCALE TEST RESULTS OF A THIN FILM EVAPORATOR SYSTEM FOR MANAGEMENT OF LIQUID HIGH-LEVEL WASTES AT THE HANFORD SITE WASHINGTON USA -11364

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    CORBETT JE; TEDESCH AR; WILSON RA

    2011-02-14

    A modular, transportable evaporator system, using thin film evaporative technology, is planned for deployment at the Hanford radioactive waste storage tank complex. This technology, herein referred to as a wiped film evaporator (WFE), will be located at grade level above an underground storage tank to receive pumped liquids, concentrate the liquid stream from 1.1 specific gravity to approximately 1.4 and then return the concentrated solution back into the tank. Water is removed by evaporation at an internal heated drum surface exposed to high vacuum. The condensed water stream will be shipped to the site effluent treatment facility for final disposal.more » This operation provides significant risk mitigation to failure of the aging 242-A Evaporator facility; the only operating evaporative system at Hanford maximizing waste storage. This technology is being implemented through a development and deployment project by the tank farm operating contractor, Washington River Protection Solutions (WRPS), for the Office of River Protection/Department of Energy (ORPIDOE), through Columbia Energy and Environmental Services, Inc. (Columbia Energy). The project will finalize technology maturity and install a system at one of the double-shell tank farms. This paper summarizes results of a pilot-scale test program conducted during calendar year 2010 as part of the ongoing technology maturation development scope for the WFE.« less

  1. Embodiment design for a multipropellant resistojet

    NASA Technical Reports Server (NTRS)

    Bao, Johnny; Chilosi, Thierry; Goodwin, Jason; Mocio, Jim; Yeh, Bruce

    1993-01-01

    This document presents the design of a multipropellant resistojet to use as an auxiliary propulsion system on the Space Station. Such a system is necessary to counteract atmospheric drag effects encountered by the Station in its orbit. NASA specifications are strictly followed with emphasis on reliability, operating life, multipropellant capability, and exhaust emission control. Several design variants are considered, and the final solution is a resistojet with an electronic pressure regulator, variable control, an internal flow heater, and a conical nozzle. To construct the resistojet, the important components are resolved independently and then integrated with secondary units. The document also includes engineering drawings of the final design with assembly instructions. Before final utilization, a prototype testing is recommended to uncover possible problems.

  2. The Common Cryogenic Test Facility for the ATLAS Barrel and End-Cap Toroid Magnets

    NASA Astrophysics Data System (ADS)

    Delruelle, N.; Haug, F.; Junker, S.; Passardi, G.; Pengo, R.; Pirotte, O.

    2004-06-01

    The large ATLAS toroidal superconducting magnet made of the Barrel and two End-Caps needs extensive testing at the surface of the individual components prior to their final assembly into the underground cavern of LHC. A cryogenic test facility specifically designed for cooling sequentially the eight coils making the Barrel Toroid (BT) has been fully commissioned and is now ready for final acceptance of these magnets. This facility, originally designed for testing individually the 46 tons BT coils, will be upgraded to allow the acceptance tests of the two End-Caps, each of them having a 160 tons cold mass. The integrated system mainly comprises a 1.2 kW@4.5 K refrigerator, a 10 kW liquid-nitrogen precooler, two cryostats housing liquid helium centrifugal pumps of respectively 80 g/s and 600 g/s nominal flow and specific instrumentation to measure the thermal performances of the magnets. This paper describes the overall facility with particular emphasis to the cryogenic features adopted to match the specific requirements of the magnets in the various operating scenarios.

  3. A 200kW central receiver CPV system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lasich, John, E-mail: jbl@raygen.com; Thomas, Ian, E-mail: ithomas@raygen.com; Hertaeg, Wolfgang

    2015-09-28

    Raygen Resources has recently completed a Central Receiver CPV (CSPV) pilot plant in Central Victoria, Australia. The system is under final commissioning and initial operation is expected in late April 2015. The pilot demonstrates a full scale CSPV repeatable unit in a form that is representative of a commercial product and provides a test bed to prove out performance and reliability of the CSPV technology. Extensive testing of the system key components: dense array module, wireless solar powered heliostat and control system has been performed in the laboratory and on sun. Results from this key component testing are presented herein.

  4. Mass Property Measurements of the Mars Science Laboratory Rover

    NASA Technical Reports Server (NTRS)

    Fields, Keith

    2012-01-01

    The NASA/JPL Mars Science Laboratory (MSL) spacecraft mass properties were measured on a spin balance table prior to launch. This paper discusses the requirements and issues encountered with the setup, qualification, and testing using the spin balance table, and the idiosyncrasies encountered with the test system. The final mass measurements were made in the Payload Hazardous Servicing Facility (PHSF) at Kennedy Space Center on the fully assembled and fueled spacecraft. This set of environmental tests required that the control system for the spin balance machine be at a remote location, which posed additional challenges to the operation of the machine

  5. TTI (Texas Transportation Institute) track/dynamometer study. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reineman, M.; Thompson, G.

    1983-01-01

    Seven passenger cars and one light truck were operated over the EPA urban and highway driving cycles to compare fuel economy measurements obtained on a test track with the fuel economy results obtained on a chassis dynamometer. The test program was designed to duplicate, as closely as possible, the track force loading (as determined by standard EPA road coastdown procedures) on the dynamometer. Experimental parameters which were investigated included loading differences between front- and rear-wheel drive vehicles, volumetric versus carbon balance fuel measurement techniques, coupled versus uncoupled roll dynamometer tests, and curved track versus straight track coastdowns.

  6. Design and Development of a Regenerative Blower for EVA Suit Ventilation

    NASA Technical Reports Server (NTRS)

    Izenson, Michael G.; Chen, Weibo; Hill, Roger W.; Phillips, Scott D.; Paul, Heather L.

    2011-01-01

    Ventilation subsystems in future space suits require a dedicated ventilation fan. The unique requirements for the ventilation fan - including stringent safety requirements and the ability to increase output to operate in buddy mode - combine to make a regenerative blower an attractive choice. This paper describes progress in the design, development, and testing of a regenerative blower designed to meet requirements for ventilation subsystems in future space suits. We have developed analysis methods for the blower s complex, internal flows and identified impeller geometries that enable significant improvements in blower efficiency. We verified these predictions by test, measuring aerodynamic efficiencies of 45% at operating conditions that correspond to the ventilation fan s design point. We have developed a compact motor/controller to drive the blower efficiently at low rotating speed (4500 rpm). Finally, we have assembled a low-pressure oxygen test loop to demonstrate the blower s reliability under prototypical conditions.

  7. Operating in "Strange New Worlds" and Measuring Success - Test and Evaluation in Complex Environments

    NASA Technical Reports Server (NTRS)

    Qualls, Garry; Cross, Charles; Mahlin, Matthew; Montague, Gilbert; Motter, Mark; Neilan, James; Rothhaar, Paul; Tran, Loc; Trujillo, Anna; Allen, B. Danette

    2015-01-01

    Software tools are being developed by the Autonomy Incubator at NASA's Langley Research Center that will provide an integrated and scalable capability to support research and non-research flight operations across several flight domains, including urban and mixed indoor-outdoor operations. These tools incorporate a full range of data products to support mission planning, approval, flight operations, and post-flight review. The system can support a number of different operational scenarios that can incorporate live and archived data streams for UAS operators, airspace regulators, and other important stakeholders. Example use cases are described that illustrate how the tools will benefit a variety of users in nominal and off-nominal operational scenarios. An overview is presented for the current state of the toolset, including a summary of current demonstrations that have been completed. Details of the final, fully operational capability are also presented, including the interfaces that will be supported to ensure compliance with existing and future airspace operations environments.

  8. The ASLOTS concept: An interactive, adaptive decision support concept for Final Approach Spacing of Aircraft (FASA). FAA-NASA Joint University Program

    NASA Technical Reports Server (NTRS)

    Simpson, Robert W.

    1993-01-01

    This presentation outlines a concept for an adaptive, interactive decision support system to assist controllers at a busy airport in achieving efficient use of multiple runways. The concept is being implemented as a computer code called FASA (Final Approach Spacing for Aircraft), and will be tested and demonstrated in ATCSIM, a high fidelity simulation of terminal area airspace and airport surface operations. Objectives are: (1) to provide automated cues to assist controllers in the sequencing and spacing of landing and takeoff aircraft; (2) to provide the controller with a limited ability to modify the sequence and spacings between aircraft, and to insert takeoffs and missed approach aircraft in the landing flows; (3) to increase spacing accuracy using more complex and precise separation criteria while reducing controller workload; and (4) achieve higher operational takeoff and landing rates on multiple runways in poor visibility.

  9. Development Studies for a Novel Wet Oxidation Process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Delphi Research

    1999-09-30

    DETOX is a catalyzed wet oxidation process that destroys organic materials in an acidic water solution of iron at 373 to 473 K. The solution can be used repeatedly to destroy great amounts of organic materials. Since the process is conducted in a contained vessel, air emissions from the process can be well controlled. The solution is also capable of dissolving and concentrating many heavy and radioactive metals for eventual stabilization and disposal. The Phase III effort for this project is fabrication, assembly, and installation of the DETOX demonstration unit, preparation of documentation and training to meet site requirements formore » operation, followed by system run-in and shakedown testing of the unit prior to demonstration testing. The Title III design was completed and the unit was fabricated according to standards set forth by OSHA, EPA, the American Petroleum Institute (i.e., chemical and petroleum industry standards), and the ASME B-313 Piping Code requirements as agreed to in preliminary design meetings with primary stakeholders. The unit was assembled in three modules and two trailers and then shipped to the TNX facility at the Savannah River Site in September and october of 1996. On-going site integration tasks were address while delays in installation arose due to funding sources and costs. In March of 1997, Delphi was authorized to proceed with the installation of the unit, making electrical and mechanical connections necessary to operate the unit. All installation tasks were completed in August of 1997. Results of an Operational Readiness Review conducted in August 1997 verified that Delphi's procedures and documentation met the necessary requirements to operate the unit at SRS. Completion of the final checklist of WSRC requirements was then addressed including the Owner's Independent Inspection Report, verifying all components of the unit met B-31.3 standards. Final hydraulic and pneumatic tests were completed in November to satisfy the B-31.3 requirement. During the month of December, the control system and heating and cooling systems were then prepared to initiate system startup and conduct the run-in tests. Shakedown tests were combined with the Phase IV tasks due to DOE funding constraints, i.e., tests formerly planned to be conducted with oil and solid materials were deferred to Phase IV and combined with similar testing. Once run-in testing has been completed, the primary objectives of Phase III will have been achieved and the project will be ready to proceed to demonstration testing (Phase IV).« less

  10. Experience Transitioning Models and Data at the NOAA Space Weather Prediction Center

    NASA Astrophysics Data System (ADS)

    Berger, Thomas

    2016-07-01

    The NOAA Space Weather Prediction Center has a long history of transitioning research data and models into operations and with the validation activities required. The first stage in this process involves demonstrating that the capability has sufficient value to customers to justify the cost needed to transition it and to run it continuously and reliably in operations. Once the overall value is demonstrated, a substantial effort is then required to develop the operational software from the research codes. The next stage is to implement and test the software and product generation on the operational computers. Finally, effort must be devoted to establishing long-term measures of performance, maintaining the software, and working with forecasters, customers, and researchers to improve over time the operational capabilities. This multi-stage process of identifying, transitioning, and improving operational space weather capabilities will be discussed using recent examples. Plans for future activities will also be described.

  11. 14 CFR 330.29 - What information must air taxi operators submit on Form 330 (Final) and Form 330-C?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false What information must air taxi operators... COMPENSATION OF AIR CARRIERS Application Procedures § 330.29 What information must air taxi operators submit on Form 330 (Final) and Form 330-C? As an air taxi operator, you must complete Form 330 (Final) in...

  12. 14 CFR 330.29 - What information must air taxi operators submit on Form 330 (Final) and Form 330-C?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false What information must air taxi operators... COMPENSATION OF AIR CARRIERS Application Procedures § 330.29 What information must air taxi operators submit on Form 330 (Final) and Form 330-C? As an air taxi operator, you must complete Form 330 (Final) in...

  13. Air Force Research Laboratory Spacecraft Cryocooler Endurance Evaluation Facility Closing Report

    NASA Astrophysics Data System (ADS)

    Armstrong, J.; Martin, K. W.; Fraser, T.

    2015-12-01

    The Air Force Research Laboratory (AFRL) Spacecraft Component Thermal Research Group has been devoted to evaluating lifetime performance of space cryocooler technology for over twenty years. Long-life data is essential for confirming design lifetimes for space cryocoolers. Continuous operation in a simulated space environment is the only accepted method to test for degradation. AFRL has provided raw data and detailed evaluations to cryocooler developers for advancing the technology, correcting discovered deficiencies, and improving cryocooler designs. At AFRL, units of varying design and refrigeration cycles were instrumented in state-of-the-art experiment stands to provide spacelike conditions and were equipped with software data acquisition to track critical cryocooler operating parameters. This data allowed an assessment of the technology's ability to meet the desired lifetime and documented any long-term changes in performance. This paper will outline a final report of the various flight cryocoolers tested in our laboratory. The data summarized includes the seven cryocoolers tested during 2014-2015. These seven coolers have a combined total of 433,326 hours (49.5 years) of operation.

  14. Mariner Jupiter/Saturn LCSSE thruster/valve assembly and injection propulsion unit rocket engine assemblies: 0.2-lbf T/VA development and margin limit test report

    NASA Technical Reports Server (NTRS)

    Clark, E. C.

    1975-01-01

    Thruster valve assemblies (T/VA's) were subjected to the development test program for the combined JPL Low-Cost Standardized Spacecraft Equipment (LCSSE) and Mariner Jupiter/Saturn '77 spacecraft (MJS) programs. The development test program was designed to achieve the following program goals: (1) demonstrate T/VA design compliance with JPL Specifications, (2) to conduct a complete performance Cf map of the T/VA over the full operating range of environment, (3) demonstrate T/VA life capability and characteristics of life margin for steady-state limit cycle and momentum wheel desaturation duty cycles, (4) verification of structural design capability, and (5) generate a computerized performance model capable of predicting T/VA operation over pressures ranging from 420 to 70 psia, propellant temperatures ranging from 140 F to 40 F, pulse widths of 0.008 to steady-state operation with unlimited duty cycle capability, and finally predict the transient performance associated with reactor heatup during any given duty cycle, start temperature, feed pressure, and propellant temperature conditions.

  15. ALMDS laser system

    NASA Astrophysics Data System (ADS)

    Kushina, Mark E.; Heberle, Geoff; Hope, Michael; Hall, David; Bethel, Michael; Calmes, Lonnie K.

    2003-06-01

    The ALMDS (Airborne Laser Mine Detection System) has been developed utilizing a solid-state laser operating at 532nm for naval mine detection. The laser system is integrated into a pod that mounts externally on a helicopter. This laser, along with other receiver systems, enables detailed underwater bathymetry. CEO designs and manufactures the laser portion of this system. Arete Associates integrates the laser system into the complete LIDAR package that utilizes sophisticated streak tube detection technology. Northrop Grumman is responsible for final pod integration. The laser sub-system is comprised of two separate parts: the LTU (Laser Transmitter Unit) and the LEU (Laser Electronics Unit). The LTU and LEU are undergoing MIL-STD-810 testing for vibration, shock, temperature storage and operation extremes, as well as MIL-STD-704E electrical power testing and MIL-STD-461E EMI testing. The Nd:YAG MOPA laser operates at 350 Hz pulse repetition frequency at 45 Watts average 532nm power and is controlled at the system level from within the helicopter. Power monitor circuits allow real time laser health monitoring, which enables input parameter adjustments for consistent laser behavior.

  16. Exomars Mission Verification Approach

    NASA Astrophysics Data System (ADS)

    Cassi, Carlo; Gilardi, Franco; Bethge, Boris

    According to the long-term cooperation plan established by ESA and NASA in June 2009, the ExoMars project now consists of two missions: A first mission will be launched in 2016 under ESA lead, with the objectives to demonstrate the European capability to safely land a surface package on Mars, to perform Mars Atmosphere investigation, and to provide communi-cation capability for present and future ESA/NASA missions. For this mission ESA provides a spacecraft-composite, made up of an "Entry Descent & Landing Demonstrator Module (EDM)" and a Mars Orbiter Module (OM), NASA provides the Launch Vehicle and the scientific in-struments located on the Orbiter for Mars atmosphere characterisation. A second mission with it launch foreseen in 2018 is lead by NASA, who provides spacecraft and launcher, the EDL system, and a rover. ESA contributes the ExoMars Rover Module (RM) to provide surface mobility. It includes a drill system allowing drilling down to 2 meter, collecting samples and to investigate them for signs of past and present life with exobiological experiments, and to investigate the Mars water/geochemical environment, In this scenario Thales Alenia Space Italia as ESA Prime industrial contractor is in charge of the design, manufacturing, integration and verification of the ESA ExoMars modules, i.e.: the Spacecraft Composite (OM + EDM) for the 2016 mission, the RM for the 2018 mission and the Rover Operations Control Centre, which will be located at Altec-Turin (Italy). The verification process of the above products is quite complex and will include some pecu-liarities with limited or no heritage in Europe. Furthermore the verification approach has to be optimised to allow full verification despite significant schedule and budget constraints. The paper presents the verification philosophy tailored for the ExoMars mission in line with the above considerations, starting from the model philosophy, showing the verification activities flow and the sharing of tests between the different levels (system, modules, subsystems, etc) and giving an overview of the main test defined at Spacecraft level. The paper is mainly focused on the verification aspects of the EDL Demonstrator Module and the Rover Module, for which an intense testing activity without previous heritage in Europe is foreseen. In particular the Descent Module has to survive to the Mars atmospheric entry and landing, its surface platform has to stay operational for 8 sols on Martian surface, transmitting scientific data to the Orbiter. The Rover Module has to perform 180 sols mission in Mars surface environment. These operative conditions cannot be verified only by analysis; consequently a test campaign is defined including mechanical tests to simulate the entry loads, thermal test in Mars environment and the simulation of Rover operations on a 'Mars like' terrain. Finally, the paper present an overview of the documentation flow defined to ensure the correct translation of the mission requirements in verification activities (test, analysis, review of design) until the final verification close-out of the above requirements with the final verification reports.

  17. ESO adaptive optics facility progress report

    NASA Astrophysics Data System (ADS)

    Arsenault, Robin; Madec, Pierre-Yves; Paufique, Jerome; La Penna, Paolo; Stroebele, Stefan; Vernet, Elise; Pirard, Jean-Francois; Hackenberg, Wolfgang; Kuntschner, Harald; Jochum, Lieselotte; Kolb, Johann; Muller, Nicolas; Le Louarn, Miska; Amico, Paola; Hubin, Norbert; Lizon, Jean-Louis; Ridings, Rob; Abad, Jose A.; Fischer, Gert; Heinz, Volker; Kiekebusch, Mario; Argomedo, Javier; Conzelmann, Ralf; Tordo, Sebastien; Donaldson, Robert; Soenke, Christian; Duhoux, Philippe; Fedrigo, Enrico; Delabre, Bernard; Jost, Andreas; Duchateau, Michel; Downing, Mark; Moreno, Javier R.; Dorn, Reinhold; Manescau, Antonio; Bonaccini Calia, Domenico; Quattri, Marco; Dupuy, Christophe; Guidolin, Ivan M.; Comin, Mauro; Guzman, Ronald; Buzzoni, Bernard; Quentin, Jutta; Lewis, Steffan; Jolley, Paul; Kraus, Maximilian; Pfrommer, Thomas; Biasi, Roberto; Gallieni, Daniele; Bechet, Clementine; Stuik, Remko

    2012-07-01

    The ESO Adaptive Optics Facility (AOF) consists in an evolution of one of the ESO VLT unit telescopes to a laser driven adaptive telescope with a deformable mirror in its optical train. The project has completed the procurement phase and several large structures have been delivered to Garching (Germany) and are being integrated (the AO modules GRAAL and GALACSI and the ASSIST test bench). The 4LGSF Laser (TOPTICA) has undergone final design review and a pre-production unit has been built and successfully tested. The Deformable Secondary Mirror is fully integrated and system tests have started with the first science grade thin shell mirror delivered by SAGEM. The integrated modules will be tested in stand-alone mode in 2012 and upon delivery of the DSM in late 2012, the system test phase will start. A commissioning strategy has been developed and will be updated before delivery to Paranal. A substantial effort has been spent in 2011-2012 to prepare the unit telescope to receive the AOF by preparing the mechanical interfaces and upgrading the cooling and electrical network. This preparation will also simplify the final installation of the facility on the telescope. A lot of attention is given to the system calibration, how to record and correct any misalignment and control the whole facility. A plan is being developed to efficiently operate the AOF after commissioning. This includes monitoring a relevant set of atmospheric parameters for scheduling and a Laser Traffic control system to assist the operator during the night and help/support the observing block preparation.

  18. Fuel Cell Power Plant Initiative. Volume 1; Solid Oxide Fuel Cell/Logistics Fuel Processor 27 kWe Power System Demonstration for ARPA

    NASA Technical Reports Server (NTRS)

    Veyo, S.E.

    1997-01-01

    This report describes the successful testing of a 27 kWe Solid Oxide Fuel Cell (SOFC) generator fueled by natural gas and/or a fuel gas produced by a brassboard logistics fuel preprocessor (LFP). The test period began on May 24, 1995 and ended on February 26, 1996 with the successful completion of all program requirements and objectives. During this time period, this power system produced 118.2 MWh of electric power. No degradation of the generator's performance was measured after 5582 accumulated hours of operation on these fuels: local natural gas - 3261 hours, jet fuel reformate gas - 766 hours, and diesel fuel reformate gas - 1555 hours. This SOFC generator was thermally cycled from full operating temperature to room temperature and back to operating temperature six times, because of failures of support system components and the occasional loss of test site power, without measurable cell degradation. Numerous outages of the LFP did not interrupt the generator's operation because the fuel control system quickly switched to local natural gas when an alarm indicated that the LFP reformate fuel supply had been interrupted. The report presents the measured electrical performance of the generator on all three fuel types and notes the small differences due to fuel type. Operational difficulties due to component failures are well documented even though they did not affect the overall excellent performance of this SOFC power generator. The final two appendices describe in detail the LFP design and the operating history of the tested brassboard LFP.

  19. Installation and first operation of the International Fusion Materials Irradiation Facility injector at the Rokkasho site

    NASA Astrophysics Data System (ADS)

    Gobin, Raphael; Bogard, Daniel; Bolzon, Benoit; Bourdelle, Gilles; Chauvin, Nicolas; Chel, Stéphane; Girardot, Patrick; Gomes, Adelino; Guiho, Patrice; Harrault, Francis; Loiseau, Denis; Lussignol, Yves; Misiara, Nicolas; Roger, Arnaud; Senée, Franck; Valette, Matthieu; Cara, Philippe; Duglué, Daniel; Gex, Dominique; Okumura, Yoshikazu; Marcos Ayala, Juan; Knaster, Juan; Marqueta, Alvaro; Kasugai, Atsushi; O'Hira, Shigeru; Shinto, Katsuhiro; Takahashi, Hiroki

    2016-02-01

    The International Fusion Materials Irradiation Facility (IFMIF) linear IFMIF prototype accelerator injector dedicated to high intensity deuteron beam production has been designed, built, and tested at CEA/Saclay between 2008 and 2012. After the completion of the acceptance tests at Saclay, the injector has been fully sent to Japan. The re-assembly of the injector has been performed between March and May 2014. Then after the check-out phase, the production of the first proton beam occurred in November 2014. Hydrogen and deuteron beam commissioning is now in progress after having proceeded with the final tests on the entire injector equipment including high power diagnostics. This article reports the different phases of the injector installation pointing out the safety and security needs, as well as the first beam production results in Japan and chopper tests. Detailed operation and commissioning results (with H+ and D+ 100 keV beams) are reported in a second article.

  20. Efficiency in pathology laboratories: a survey of operations management in NHS bacteriology.

    PubMed

    Szczepura, A K

    1991-01-01

    In recent years pathology laboratory services in the U.K. have experienced large increases in demand. But the extent to which U.K. laboratories have introduced controls to limit unnecessary procedures within the laboratory was previously unclear. This paper presents the results of a survey of all 343 NHS bacteriology laboratories which records the extent to which such operations management controls are now in place. The survey shows large differences between laboratories. Quality controls over inputs, the use of screening tests as a culture substitute, the use of direct susceptibility testing, controls over routine antibiotic susceptibility testing, and controls over reporting of results all vary widely. The survey also records the prevalence of hospital antibiotic policies, the extent to which laboratories produce antibiograms for user clinicians, the degree of computerisation in data handling, and the degree of automation in processing specimens. Finally, the survey uncovers a large variation between NHS labs in the percentage of bacteriology samples which prove positive and lead to antibiotic susceptibility tests being carried out.

  1. Analyzing the test process using structural coverage

    NASA Technical Reports Server (NTRS)

    Ramsey, James; Basili, Victor R.

    1985-01-01

    A large, commercially developed FORTRAN program was modified to produce structural coverage metrics. The modified program was executed on a set of functionally generated acceptance tests and a large sample of operational usage cases. The resulting structural coverage metrics are combined with fault and error data to evaluate structural coverage. It was shown that in the software environment the functionally generated tests seem to be a good approximation of operational use. The relative proportions of the exercised statement subclasses change as the structural coverage of the program increases. A method was also proposed for evaluating if two sets of input data exercise a program in a similar manner. Evidence was provided that implies that in this environment, faults revealed in a procedure are independent of the number of times the procedure is executed and that it may be reasonable to use procedure coverage in software models that use statement coverage. Finally, the evidence suggests that it may be possible to use structural coverage to aid in the management of the acceptance test processed.

  2. Context Effects in Norwegian 10th-Grade Students' Reports on Learning Strategies Using the Cross-Curricular Competencies Instrument

    ERIC Educational Resources Information Center

    Samuelstuen, Marit S.; Braten, Ivar; Valas, Harald

    2007-01-01

    This study examined contextual effects in Norwegian 10th-grade students' reports on cognitive and metacognitive strategies when using the Cross-Curricular Competencies (CCC) instrument. The CCC was first administered as the final task in a long (three-hour) testing session in the Organisation for Economic Co-operation and Development Program for…

  3. Shock Testing the SEAWOLF Submarine, Final Environmental Impact Statement

    DTIC Science & Technology

    1998-05-01

    relevant experience. Phil Barfield. Operational requirements. B.S. Mechanical Engineering. 14 years relevant experience. James Craig . Appendix D. B.S...Atlantic Biodiversity Center Nassau, Delaware Russell DeConti Center for Coastal Studies Provincetown, Massachusetts Robert Deegan Sierra Club...either area. C-9 APPENDIX D PHYSICAL IMPACTS OF EXPLOSIONS ON MARINE MAMMALS AND TURTLES James C. Craig Christian W. Hearn Naval Surface Warfare

  4. Simulation of planetary entry radiative heating with a CO2 gasdynamic laser

    NASA Technical Reports Server (NTRS)

    Lundell, J. H.; Dickey, R. R.; Howe, J. T.

    1975-01-01

    Heating encountered during entry into the atmospheres of Jupiter, Saturn, and Uranus is described, followed by a discussion of the use of a CO2 gasdynamic laser to simulate the radiative component of the heating. Operation and performance of the laser is briefly described. Finally, results of laser tests of some candidate heat-shield materials are presented.

  5. Developing a model of competence in the operating theatre: psychometric validation of the perceived perioperative competence scale-revised.

    PubMed

    Gillespie, Brigid M; Polit, Denise F; Hamlin, Lois; Chaboyer, Wendy

    2012-01-01

    This paper describes the development and validation of the Revised Perioperative Competence Scale (PPCS-R). There is a lack of a psychometrically tested sound self-assessment tools to measure nurses' perceived competence in the operating room. Content validity was established by a panel of international experts and the original 98-item scale was pilot tested with 345 nurses in Queensland, Australia. Following the removal of several items, a national sample that included all 3209 nurses who were members of the Australian College of Operating Room Nurses was surveyed using the 94-item version. Psychometric testing assessed content validity using exploratory factor analysis, internal consistency using Cronbach's alpha, and construct validity using the "known groups" technique. During item reduction, several preliminary factor analyses were performed on two random halves of the sample (n=550). Usable data for psychometric assessment were obtained from 1122 nurses. The original 94-item scale was reduced to 40 items. The final factor analysis using the entire sample resulted in a 40 item six-factor solution. Cronbach's alpha for the 40-item scale was .96. Construct validation demonstrated significant differences (p<.0001) in perceived competence scores relative to years of operating room experience and receipt of specialty education. On the basis of these results, the psychometric properties of the PPCS-R were considered encouraging. Further testing of the tool in different samples of operating room nurses is necessary to enable cross-cultural comparisons. Copyright © 2011 Elsevier Ltd. All rights reserved.

  6. Test and evaluation of load converter topologies used in the Space Station Freedom Power Management and distribution DC test bed

    NASA Technical Reports Server (NTRS)

    Lebron, Ramon C.; Oliver, Angela C.; Bodi, Robert F.

    1991-01-01

    Power components hardware in support of the Space Station Freedom dc Electrical Power System were tested. One type of breadboard hardware tested is the dc Load Converter Unit, which constitutes the power interface between the electric power system and the actual load. These units are dc to dc converters that provide the final system regulation before power is delivered to the load. Three load converters were tested: a series resonant converter, a series inductor switchmode converter, and a switching full-bridge forward converter. The topology, operation principles, and tests results are described, in general. A comparative analysis of the three units is given with respect to efficiency, regulation, short circuit behavior (protection), and transient characteristics.

  7. Advanced Stirling Convertor Dynamic Test Approach and Results

    NASA Technical Reports Server (NTRS)

    Meer, David W.; Hill, Dennis; Ursic, Joseph J.

    2010-01-01

    The U.S. Department of Energy (DOE), Lockheed Martin Corporation (LM), and NASA Glenn Research Center (GRC) have been developing the Advanced Stirling Radioisotope Generator (ASRG) for use as a power system for space science missions. As part of the extended operation testing of this power system, the Advanced Stirling Convertors (ASC) at NASA GRC undergo a vibration test sequence intended to simulate the vibration history that an ASC would experience when used in an ASRG for a space mission. This sequence includes testing at workmanship and flight acceptance levels interspersed with periods of extended operation to simulate prefueling and post fueling. The final step in the test sequence utilizes additional testing at flight acceptance levels to simulate launch. To better replicate the acceleration profile seen by an ASC incorporated into an ASRG, the input spectra used in testing the convertors was modified based on dynamic testing of the ASRG Engineering Unit (ASRG EU) at LM. This paper outlines the overall test approach, summarizes the test results from the ASRG EU, describes the incorporation of those results into the test approach, and presents the results of applying the test approach to the ASC-1 #3 and #4 convertors. The test results include data from several accelerometers mounted on the convertors as well as the piston position and output power variables.

  8. Last SSME test on A-1

    NASA Image and Video Library

    2006-09-29

    The Stennis Space Center conducted the final space shuttle main engine test on its A-1 Test Stand Friday. The A-1 Test Stand was the site of the first test on a shuttle main engine in 1975. Stennis will continue testing shuttle main engines on its A-2 Test Stand through the end of the Space Shuttle Program in 2010. The A-1 stand begins a new chapter in its operational history in October. It will be temporarily decommissioned to convert it for testing the J-2X engine, which will power the upper stage of NASA's new crew launch vehicle, the Ares I. Although this ends the stand's work on the Space Shuttle Program, it will soon be used for the rocket that will carry America's next generation human spacecraft, Orion.

  9. Tidd hot gas clean up program. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This Final Report on the Tidd Hot Gas Clean Up Program covers the period from initial Proof-of-Concept testing in August, 1990, through final equipment inspections in May, 1995. The Tidd Hot Gas Clean Up (HGCU) system was installed in the Tidd Pressurized Fluidized Bed Combustion (PFBC) Demonstration Plant, which is the first utility-scale PFBC plant in the United States. Detailed design work on the project began in July, 1990, and site construction began in December, 1991. Initial operation of the system occurred in May, 1992, and the hot gas filter was commissioned in October, 1992. The test program ended inmore » March, 1995, when the Tidd Plant was shut down following its four-year test program. Section 1.0 of this report is an executive summary of the project covering the project background, system description, test results and conclusions. Section 2.0 is an introduction covering the program objectives and schedule. Section 3.0 provides detailed descriptions of the system and its major components. Section 4.0 provides detailed results of all testing including observations and posttest inspection results. Sections 5.0 and 6.0 list the program conclusions and recommendations, respectively. Appendix I is a report prepared by Southern Research Institute on the properties of Tidd PFBC ash sampled during the test program. Appendix II is a report prepared by Westinghouse STC on the performance of candle filter fail-safe regenerator devices.« less

  10. Geoscience Laser Altimeter System (GLAS) Instrument: Flight Loop Heat Pipe (LHP) Acceptance Thermal Vacuum Test

    NASA Technical Reports Server (NTRS)

    Baker, Charles; Butler, Dan; Ku, Jentung; Grob, Eric; Swanson, Ted; Nikitkin, Michael; Powers, Edward I. (Technical Monitor)

    2001-01-01

    Two loop heat pipes (LHPs) are to be used for tight thermal control of the Geoscience Laser Altimeter System (GLAS) instrument, planned for flight in late 2001. The LHPs are charged with Propylene as a working fluid. One LHP will be used to transport 110 W from a laser to a radiator, the other will transport 160 W from electronic boxes to a separate radiator. The application includes a large amount of thermal mass in each LHP system and low initial startup powers. The initial design had some non-ideal flight design compromises, resulted in a less than ideal charge level for this design concept with a symmetrical secondary wick. This less than ideal charge was identified as the source of inadequate performance of the flight LHPs during the flight thermal vacuum test in October of 2000. We modified the compensation chamber design, re-built and charged the LHPs for a final LHP acceptance thermal vacuum test. This test performed March of 2001 was 100% successful. This is the last testing to be performed on the LHPs prior to instrument thermal vacuum test. This sensitivity to charge level was shown through varying the charge on a Development Model Loop Heat Pipe (DM LHP) and evaluating performance at various fill levels. At lower fills similar to the original charge in the flight units, the same poor performance was observed. When the flight units were re-designed and filled to the levels similar to the initial successful DM LHP test, the flight units also successfully fulfilled all requirements. This final flight Acceptance test assessed performance with respect to startup, low power operation, conductance, and control heater power, and steady state control. The results of the testing showed that both LHPs operated within specification. Startup on one of the LHPs was better than the other LHP because of the starter heater placement and a difference in evaporator design. These differences resulted in a variation in the achieved superheat prior to startup. The LHP with the lower superheat was sensitive to the thermal environment around the compensation chamber, while the LHP with the higher superheat (similar in design to DM LHP) was not. In response to the test results the placement of the starter heater will be optimized for the flight instrument testing for higher achieved superheat. This presentation discusses startup behavior, overall conductance of a radiator system, low power operation, high power operation, temperature control stability, and control heater power requirements as measured during this acceptance thermal vacuum test. A brief summary of 'lessons learned' will be included.

  11. Detection performance assessment of hand-held mine detection systems in a procurement process: test set-up for MDs and MD/GPRs

    NASA Astrophysics Data System (ADS)

    Schoolderman, Arnold J.; Roosenboom, Jacques H. J.

    2005-06-01

    The Engineers Centre of Expertise of the Royal Netherlands Army (RNLA) has conducted a study on countermine in peace operations. This study, finished in 2002, concluded that the final solution to countermine will depend in the first place on better detection of buried low-metal mines, e.g. by direct detection of the explosive components in mines. Until such detection systems are available, intermediate solutions are necessary in order to assure freedom of movement in peace operations. Because countermine operations consist of a number of different activities (area preparation, detection, clearance, etc) and the suitability of the different types of available equipment depends on the scenario, the toolbox concept for countermine equipment was adopted. In 2003 a procurement process was started in order to fill this toolbox with commercial-off-the-shelf and military-off-the-shelf equipment. The paper gives a concise description of the study on countermine operations and the procurement process, and subsequently focuses on the set-up of the tests that were conducted in the framework of the procurement of hand-held mine detection systems, like metal detectors and dual-sensor mine detectors. Programs of requirements for these systems were drawn up, aiming at systems for general use and special purpose systems. Blind tests to check the compliancy to the detection performance requirements were designed and conducted in the short timeframe that was available in the procurement process. These tests are discussed in this paper, including the set-up of the test lanes, the targets used and their depths, and the role of the operator. The tests of the capability of the detectors to discriminate small targets adjacent to large targets were conducted according the guidelines of the CEN Workshop Agreement on metal detector tests. Although the results of the tests are commercially confidential, conclusions and lessons learned from the execution of these tests are presented.

  12. Response Variability in Commercial MOSFET SEE Qualification

    DOE PAGES

    George, J. S.; Clymer, D. A.; Turflinger, T. L.; ...

    2016-12-01

    Single-event effects (SEE) evaluation of five different part types of next generation, commercial trench MOSFETs indicates large part-to-part variation in determining a safe operating area (SOA) for drain-source voltage (V DS) following a test campaign that exposed >50 samples per part type to heavy ions. These results suggest a determination of a SOA using small sample sizes may fail to capture the full extent of the part-to-part variability. An example method is discussed for establishing a Safe Operating Area using a one-sided statistical tolerance limit based on the number of test samples. Finally, burn-in is shown to be a criticalmore » factor in reducing part-to-part variation in part response. Implications for radiation qualification requirements are also explored.« less

  13. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study: Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schey, Stephen; Francfort, Jim

    2015-06-01

    Collect and evaluate data on federal fleet operations as part of the Advanced Vehicle Testing Activity’s Federal Fleet Vehicle Data Logging and Characterization Study. The Advanced Vehicle Testing Activity study seeks to collect and evaluate data to validate the utilization of advanced plug-in electric vehicle (PEV) transportation. This report summarizes the fleets studied to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of PEVs into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a batterymore » electric vehicle or plug-in hybrid electric vehicle (collectively referred to as PEVs) can fulfill the mission requirements.« less

  14. Response Variability in Commercial MOSFET SEE Qualification

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    George, J. S.; Clymer, D. A.; Turflinger, T. L.

    Single-event effects (SEE) evaluation of five different part types of next generation, commercial trench MOSFETs indicates large part-to-part variation in determining a safe operating area (SOA) for drain-source voltage (V DS) following a test campaign that exposed >50 samples per part type to heavy ions. These results suggest a determination of a SOA using small sample sizes may fail to capture the full extent of the part-to-part variability. An example method is discussed for establishing a Safe Operating Area using a one-sided statistical tolerance limit based on the number of test samples. Finally, burn-in is shown to be a criticalmore » factor in reducing part-to-part variation in part response. Implications for radiation qualification requirements are also explored.« less

  15. SNAP-8 electrical generating system development program

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The SNAP-8 program has developed the technology base for one class of multikilowatt dynamic space power systems. Electrical power is generated by a turbine-alternator in a mercury Rankine-cycle loop to which heat is transferred and removed by means of sodium-potassium eutectic alloy subsystems. Final system overall criteria include a five-year operating life, restartability, man rating, and deliverable power in the 90 kWe range. The basic technology has been demonstrated by more than 400,000 hours of major component endurance testing and numerous startup and shutdown cycles. A test system, comprised of developed components, delivered up to 35 kWe for a period exceeding 12,000 hours. The SNAP-8 system baseline is considered to have achieved a level of technology suitable for final application development for long-term multikilowatt space missions.

  16. KSC-2009-2209

    NASA Image and Video Library

    2009-03-19

    CAPE CANAVERAL, Fla. – – The NASA Railroad (right) is ready for the exchange of the Florida East Coast Railway cars carrying the booster segments for the Ares I-X test rocket. The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida. The segments will be delivered to the Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Kim Shiflett

  17. KSC-2209-2205

    NASA Image and Video Library

    2009-03-19

    CAPE CANAVERAL, Fla. – The Florida East Coast Railway train arrives at the Jay Jay Rail Yard with the booster segments for the Ares I-X test rocket for interchange with the NASA Railroad (left). The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida. The segments will be delivered to the Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Kim Shiflett

  18. KSC-2009-2203

    NASA Image and Video Library

    2009-03-19

    CAPE CANAVERAL, Fla. – The Florida East Coast Railway train arrives at the Jay Jay Rail Yard with the booster segments for the Ares I-X test rocket for interchange with the NASA Railroad. The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida. The segments will be delivered to the Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Kim Shiflett

  19. KSC-2009-2208

    NASA Image and Video Library

    2009-03-19

    CAPE CANAVERAL, Fla. – The NASA Railroad (right) is ready for the exchange of the Florida East Coast Railway cars carrying the booster segments for the Ares I-X test rocket. The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida. The segments will be delivered to the Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Kim Shiflett

  20. KSC-2009-2204

    NASA Image and Video Library

    2009-03-19

    CAPE CANAVERAL, Fla. – The Florida East Coast Railway train arrives at the Jay Jay Rail Yard with the booster segments for the Ares I-X test rocket for interchange with the NASA Railroad. The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida. The segments will be delivered to the Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Kim Shiflett

  1. KSC-2009-2201

    NASA Image and Video Library

    2009-03-19

    CAPE CANAVERAL, Fla. – The Florida East Coast Railway train arrives at the Jay Jay Rail Yard with the booster segments for the Ares I-X test rocket for interchange with the NASA Railroad. The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida. The segments will be delivered to the Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Kim Shiflett

  2. Development of a Microchannel High Temperature Recuperator for Fuel Cell Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lukas, Michael

    This report summarizes the progress made in development of microchannel recuperators for high temperature fuel cell/turbine hybrid systems for generation of clean power at very high efficiencies. Both Solid Oxide Fuel Cell/Turbine (SOFC/T) and Direct FuelCell/Turbine (DFC/T) systems employ an indirectly heated Turbine Generator to supplement fuel cell generated power. The concept extends the high efficiency of the fuel cell by utilizing the fuel cell’s byproduct heat in a Brayton cycle. Features of the SOFC/T and DFC/T systems include: electrical efficiencies of up to 65% on natural gas, minimal emissions, reduced carbon dioxide release to the environment, simplicity in design,more » and potential cost competitiveness with existing combined cycle power plants. Project work consisted of candidate material selection from FuelCell Energy (FCE) and Pacific Northwest National Laboratory (PNNL) institutional databases as well as from industrial and academic literature. Candidate materials were then downselected and actual samples were tested under representative environmental conditions resulting in further downselection. A microchannel thermal-mechanical model was developed to calculate overall device cost to be later used in developing a final Tier 1 material candidate list. Specifications and operating conditions were developed for both SOFC/T and DFC/T systems. This development included system conceptualization and progression to process flow diagrams (PFD’s) including all major equipment. Material and energy balances were then developed for the two types of systems which were then used for extensive sensitivity studies that used high temperature recuperator (HTR) design parameters (e.g., operating temperature) as inputs and calculated overall system parameters (e.g., system efficiency). The results of the sensitivity studies determined the final HTR design temperatures, pressure drops, and gas compositions. The results also established operating conditions and specifications for all equipment in the SOFC/T and DFC/T systems. Capital cost and Cost of Electricity (COE) sensitivity analyses have been completed for MW-scale SOFC/T and DFC/T systems. Environmental testing consisted of 1000-hour and 2000-hour dry air oxidation testing on leading candidate materials, used to rank order and, in part, develop a final Tier 1 material candidate list. A thermal-mechanical model was subsequently used to provide material and manufacturing cost estimations for microchannel HTR’s to further refine the Tier 1 candidates. A capital cost and 20-year levelized cost of electricity (COE) was developed for a MW-scale version of the SOFC/T system concept as well as for a MW-scale version of the DFC/T system concept. Test frameworks were established for subsequent long-term materials stability testing, including oxidation resistance and mechanical strength. Mechanical strength testing was then carried out by a third-party test laboratory. Technology demonstration vehicles (TDV’s) were designed and fabricated. Several iterations of TDV’s were fabricated, each improved over the previous build as far as fabrication techniques. Two of three fabricated TDV’s were integrated with the TDV Test Facility for hot-testing at simulated operating conditions. The second of these two was successfully hot-tested for over 1000 hours at simulated temperature and pressure. Post-test leakdown assessment showed negligible leakage at benchtop conditions of 30 psig, a considerable improvement over the previous TDV’s.« less

  3. Dish stirling solar receiver combustor test program

    NASA Technical Reports Server (NTRS)

    Bankston, C. P.; Back, L. H.

    1981-01-01

    The operational and energy transfer characteristics of the Dish Stirling Solar Receiver (DSSR) combustor/heat exchanger system was evaluated. The DSSR is designed to operate with fossil fuel augmentation utilizing a swirl combustor and cross flow heat exchanger consisting of a single row of 4 closely spaced tubes that are curved into a conical shape. The performance of the combustor/heat exchanger system without a Stirling engine was studied over a range of operating conditions and output levels using water as the working fluid. Results show that the combustor may be started under cold conditions, controlled safety, and operated at a constant air/fuel ratio (10 percent excess air) over the required range of firing rates. Furthermore, nondimensional heat transfer coefficients based on total heat transfer are plotted versus Reynolds number and compared with literature data taken for single rows of closely spaced tubes perpendicular to cross flow. The data show enhanced heat transfer for the present geometry and test conditions. Analysis of the results shows that the present system meets specified thermal requirements, thus verifying the feasibility of the DSSR combustor design for final prototype fabrication.

  4. Human Factors Evaluation of Conflict Detection Tool for Terminal Area

    NASA Technical Reports Server (NTRS)

    Verma, Savita Arora; Tang, Huabin; Ballinger, Deborah; Chinn, Fay Cherie; Kozon, Thomas E.

    2013-01-01

    A conflict detection and resolution tool, Terminal-area Tactical Separation-Assured Flight Environment (T-TSAFE), is being developed to improve the timeliness and accuracy of alerts and reduce the false alert rate observed with the currently deployed technology. The legacy system in use today, Conflict Alert, relies primarily on a dead reckoning algorithm, whereas T-TSAFE uses intent information to augment dead reckoning. In previous experiments, T-TSAFE was found to reduce the rate of false alerts and increase time between the alert to the controller and a loss of separation over the legacy system. In the present study, T-TSAFE was tested under two meteorological conditions, 1) all aircraft operated under instrument flight regimen, and 2) some aircraft operated under mixed operating conditions. The tool was used to visually alert controllers to predicted Losses of separation throughout the terminal airspace, and show compression errors, on final approach. The performance of T-TSAFE on final approach was compared with Automated Terminal Proximity Alert (ATPA), a tool recently deployed by the FAA. Results show that controllers did not report differences in workload or situational awareness between the T-TSAFE and ATPA cones but did prefer T-TSAFE features over ATPA functionality. T-TSAFE will provide one tool that shows alerts in the data blocks and compression errors via cones on the final approach, implementing all tactical conflict detection and alerting via one tool in TRACON airspace.

  5. SPDE/SPRE final summary report

    NASA Technical Reports Server (NTRS)

    Dochat, George

    1993-01-01

    Mechanical Technology Incorporated (MTI) performed acceptance testing on the Space Power Research Engine (SPRE), which demonstrated satisfactory operation and sufficient reliability for delivery to NASA Lewis Research Center. The unit produced 13.5 kW PV power with an efficiency of 22 percent versus design goals of 28.8 kW PV power and efficiency of 28 percent. Maximum electric power was only 8 kWe due to lower alternator efficiency. One of the major shortcomings of the SPRE was linear alternator efficiency, which was only 70 percent compared to a design value of 90 percent. It was determined from static tests that the major cause for the efficiency shortfall was the location of the magnetic structure surrounding the linear alternator. Testing of an alternator configuration without a surrounding magnetic structure on a linear dynamometer confirmed earlier static test results. Linear alternator efficiency improved from 70 percent to over 90 percent. Testing of the MTI SPRE was also performed with hydrodynamic bearings and achieved full-stroke, stable operation. This testing indicated that hydrodynamic bearings may be useful in free piston Stirling engines. An important factor in achieving stable operation at design stroke was isolating a portion of the bearing length from the engine pressure variations. In addition, the heat pipe heater head design indicates that integration of a Stirling engine with a heat source can be performed via heat pipes. This design provides a baseline against which alternative designs can be measured.

  6. Status of black chrome coating research

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pettit, R.B.; Sowell, R.R.

    1983-01-01

    Recent results regarding the optimization of electrodeposited black chrome solar selective coatings for operation in solar collectors to temperatures up to 300/sup 0/C are summarized. Careful control of the electroplating-bath composition and special regard for bath contamination are required in order to obtain coatings that will survive daily collector operation for tens of years. An accelerated temperature aging test is presented which can be used both to estimate the coating lifetime and to monitor the coating during production. Finally, the use of sol-gel protective films to extend the lifetime of the black chrome coating is also discussed.

  7. Remote operated vehicle with CO{sub 2} blasting (ROVCO{sub 2}): Volume 1. Final report, September 1993--July 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-06-01

    This report documents the second phase of the Remote Operated Vehicle with CO{sub 2} Blasting (ROVCO{sub 2}) Program. The ROVCO{sub 2} Program`s goal is to develop and demonstrate a tool to improve the productivity of concrete floor decontamination. The second phase integrated non-developmental subsystems on to the ROVCO{sub 2} system and performed quantitative decontamination effectiveness, productivity, and reliability testings. The report documents these development activities and the analysis of cost and performance. The results show that the ROVCO{sub 2} system is an efficient decontamination tool.

  8. Design of a blood-freezing system for leukemia research

    NASA Technical Reports Server (NTRS)

    Williams, T. E.; Cygnarowicz, T. A.

    1978-01-01

    Leukemia research involves the use of cryogenic freezing and storage equipment. In a program being carried out at the National Cancer Institute (NCI), bone marrow (white blood cells) was frozen using a standard cryogenic biological freezer. With this system, it is difficult to maintain the desired rate of freezing and repeatability from sample to sample. A freezing system was developed that satisfies the requirements for a repeatable, constant freezing rate. The system was delivered to NIC and is now operational. This report describes the design of the major subsystems, the analyses, the operating procedure, and final system test results.

  9. Project W-314 acceptance test report HNF-4647 for HNF-4646 241-B pit leak detection ANB-WT-LDSTA-231 for project W-314

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    HAMMERS, J.S.

    The purpose of the test was to verify that the AN Tank Farm B Pit Leak Detector components are functionally integrated and operate in accordance with engineering design specifications. The Acceptance Test Procedure HNF-4646,241-AN-B-Pit Leak Detection ANB-WT-LDSTA-231 was conducted between 26 June and 02 July 1999 at the 200E AN Tank Farm. The test has been completed with no open test exceptions. The test was conducted prior to final engineering ''as built'' activities being completed this had no impact on the procedure or test results. All components, identified in the procedure were found to be labeled and identified as writtenmore » in the procedure.« less

  10. Overview of medical operations for a manned stratospheric balloon flight.

    PubMed

    Blue, Rebecca S; Law, Jennifer; Norton, Sean C; Garbino, Alejandro; Pattarini, James M; Turney, Matthew W; Clark, Jonathan B

    2013-03-01

    Red Bull Stratos was a commercial program designed to bring a test parachutist protected by a full-pressure suit via a stratospheric balloon with a pressurized capsule to 120,000 ft (36,576 m), from which he would freefall and subsequently parachute to the ground. On March 15, 2012, the Red Bull Stratos program successfully conducted a preliminary manned balloon test flight and parachute jump, reaching a final altitude of 71,581 ft (21,818 m). In light of the uniqueness of the operation and medical threats faced, a comprehensive medical plan was needed to ensure prompt and efficient response to any medical contingencies. This report will serve to discuss the medical plans put into place before the first manned balloon flight and the actions of the medical team during that flight. The medical operations developed for this program will be systematically evaluated, particularly, specific recommendations for improvement in future high-altitude and commercial space activities. A multipronged approach to medical support was developed, consisting of event planning, medical personnel, equipment, contingency-specific considerations, and communications. Medical operations were found to be highly successful when field-tested during this stratospheric flight, and the experience allowed for refinement of medical operations for future flights. The lessons learned and practices established for this program can easily be used to tailor a plan specific to other aviation or spaceflight events.

  11. The Sensor Test for Orion RelNav Risk Mitigation (STORRM) Development Test Objective

    NASA Technical Reports Server (NTRS)

    Christian, John A.; Hinkel, Heather; D'Souza, Christopher N.; Maguire, Sean; Patangan, Mogi

    2011-01-01

    The Sensor Test for Orion Relative-Navigation Risk Mitigation (STORRM) Development Test Objective (DTO) flew aboard the Space Shuttle Endeavour on STS-134 in May- June 2011, and was designed to characterize the performance of the flash LIDAR and docking camera being developed for the Orion Multi-Purpose Crew Vehicle. The flash LIDAR, called the Vision Navigation Sensor (VNS), will be the primary navigation instrument used by the Orion vehicle during rendezvous, proximity operations, and docking. The DC will be used by the Orion crew for piloting cues during docking. This paper provides an overview of the STORRM test objectives and the concept of operations. It continues with a description of STORRM's major hardware components, which include the VNS, docking camera, and supporting avionics. Next, an overview of crew and analyst training activities will describe how the STORRM team prepared for flight. Then an overview of in-flight data collection and analysis is presented. Key findings and results from this project are summarized. Finally, the paper concludes with lessons learned from the STORRM DTO.

  12. NASA HERMeS Hall Thruster Electrical Configuration Characterization

    NASA Technical Reports Server (NTRS)

    Peterson, Peter; Kamhawi, Hani; Huang, Wensheng; Yim, John; Herman, Daniel; Williams, George; Gilland, James; Hofer, Richard

    2016-01-01

    NASAs Hall Effect Rocket with Magnetic Shielding (HERMeS) 12.5 kW Technology Demonstration Unit-1 (TDU-1) Hall thruster has been the subject of extensive technology maturation in preparation for development into a flight ready propulsion system. Part of the technology maturation was to test the TDU-1 thruster in several ground based electrical configurations to assess the thruster robustness and suitability to successful in-space operation. The ground based electrical configuration testing has recently been demonstrated as an important step in understanding and assessing how a Hall thruster may operate differently in space compared to ground based testing, and to determine the best configuration to conduct development and qualification testing. This presentation will cover the electrical configuration testing of the TDU-1 HERMeS Hall thruster in NASA Glenn Research Centers Vacuum Facility 5. The three electrical configurations examined are the thruster body tied to facility ground, thruster floating, and finally the thruster body electrically tied to cathode common. The TDU-1 HERMeS was configured with two different exit plane boundary conditions, dielectric and conducting, to examine the influence on the electrical configuration characterization.

  13. Development of a fiber optic compressor blade sensor

    NASA Technical Reports Server (NTRS)

    Dhadwal, Harbans Singh

    1995-01-01

    A complete working prototype of the fiber optic blade tip sensor was first tested in the laboratory, followed by a thorough evaluation at NASA W8 Single Compressor Stage Facility in Lewis Research Center. Subsequently, a complete system with three parallel channels was fabricated and delivered to Dr. Kurkov. The final system was tested in the Subsonic Wind Tunnel Facility, in parallel with The General Electric Company's light probe system. The results at all operating speeds were comparable. This report provides a brief description of the system and presents a summary of the experimental results.

  14. Characterization of the IEC 61000-4-6 Electromagnetic Clamp for Conducted-Immunity Testing

    NASA Astrophysics Data System (ADS)

    Grassi, F.; Pignari, S. A.; Spadacini, G.; Toscani, N.; Pelissou, P.

    2016-05-01

    A multiconductor transmission line model (MTL) is used to investigate the operation of the IEC 61000-4-6 electromagnetic (EM) clamp in a conducted-immunity test setup for aerospace applications. Aspects of interest include the performance of such a coupling device at very high frequencies (up to 1 GHz), and for extreme values of the common-mode impedance of equipment (short circuits, open circuits). The MTL model is finally exploited to predict the frequency response of coupling and decoupling factors defined in the IEC 61000-4-6 standard.

  15. Cargo Movement Operations System (CMOS) Software Test Plan. Final

    DTIC Science & Technology

    1990-07-26

    NO [ ] COMMENT DISPOSITION: COMMENT STATUS: OPEN [ ] CLOSED [ ] ORIGINATOR CONTROL NUMBER: STP-0002 PROGRAM OFFICE CONTROL NUMBER: DATA ITEM DISCREPANCY WORKSHEET CDRL NUMBER: A007-03 DATE: 07/26/90 ORIGINATOR NAME: John J.Brassil OFFICE SYMBOL: SAIC TELEPHONE NU4BER: 272-2999 SUBSTANTIVE: X EDITORIAL: PAGE NUMBER: 63 PARA NUMBER: Table 4.2.1.2 COMMENT OR RECOMMENDED CHANGE: Replace the reference to the Source and Destination STP paragraphs with a reference to the paragraph of the STP which tests the interface itself. RATIONALE: Each internal

  16. Applications and requirements for real-time simulators in ground-test facilities

    NASA Technical Reports Server (NTRS)

    Arpasi, Dale J.; Blech, Richard A.

    1986-01-01

    This report relates simulator functions and capabilities to the operation of ground test facilities, in general. The potential benefits of having a simulator are described to aid in the selection of desired applications for a specific facility. Configuration options for integrating a simulator into the facility control system are discussed, and a logical approach to configuration selection based on desired applications is presented. The functional and data path requirements to support selected applications and configurations are defined. Finally, practical considerations for implementation (i.e., available hardware and costs) are discussed.

  17. Flight Test Techniques. Proceedings of the Flight Mechanics Panel Symposium Held in Lisbon, Portugal on 2-5 April 1984

    DTIC Science & Technology

    1984-07-01

    results are caused only by the individual aerodynamic cleanliness. A table in thr lower part of this figure gives a, frst impression of the surface quality ...for the Tornado which will be the firso, iarc-iaft in operational service in t•• .. , SGersany and Italy to be so equipped. -nen considering the...and must be tested to the limits of their capability before being released to Service . The. final lesson is that when a high risk trial is undertaken

  18. View of equipment used for Heat Flow and Convection Experiment

    NASA Image and Video Library

    1972-12-17

    AS17-162-24063 (7-19 Dec. 1972) --- A close-up view of the equipment used for the Heat Flow and Convection Experiment, an engineering and operational test and demonstration carried out aboard the Apollo 17 command module during the final lunar landing mission in NASA's Apollo program. Three test cells were used in the demonstration for measuring and observing fluid flow behavior in the absence of gravity in space flight. Data obtained from such demonstrations will be valuable in the design of future science experiments and for manufacturing processes in space.

  19. Manual flying of curved precision approaches to landing with electromechanical instrumentation. A piloted simulation study

    NASA Technical Reports Server (NTRS)

    Knox, Charles E.

    1993-01-01

    A piloted simulation study was conducted to examine the requirements for using electromechanical flight instrumentation to provide situation information and flight guidance for manually controlled flight along curved precision approach paths to a landing. Six pilots were used as test subjects. The data from these tests indicated that flight director guidance is required for the manually controlled flight of a jet transport airplane on curved approach paths. Acceptable path tracking performance was attained with each of the three situation information algorithms tested. Approach paths with both multiple sequential turns and short final path segments were evaluated. Pilot comments indicated that all the approach paths tested could be used in normal airline operations.

  20. Correlation of Hollow Cathode Assembly and Plasma Contactor Data from Ground Testing and In-Space Operation on the International Space Station

    NASA Technical Reports Server (NTRS)

    Kovalkeski, Scott D.; Patterson, Michael J.; Soulas, George C.

    2001-01-01

    Charge control on the International Space Station (ISS) is currently being provided by two plasma contactor units (PCUs). The plasma contactor includes a hollow cathode assembly (HCA), power processing unit and Xe gas feed system. The hollow cathode assemblies in use in the ISS plasma contactors were designed and fabricated at the NASA Glenn Research Center. Prequalification testing of development HCAs as well as acceptance testing of the flight HCAs is presented. Integration of the HCAs into the Boeing North America built PCU and acceptance testing of the PCU are summarized in this paper. Finally, data from the two on-orbit PCUs is presented.

  1. Multi-KW dc distribution system technology research study

    NASA Technical Reports Server (NTRS)

    Dawson, S. G.

    1978-01-01

    The Multi-KW DC Distribution System Technology Research Study is the third phase of the NASA/MSFC study program. The purpose of this contract was to complete the design of the integrated technology test facility, provide test planning, support test operations and evaluate test results. The subjet of this study is a continuation of this contract. The purpose of this continuation is to study and analyze high voltage system safety, to determine optimum voltage levels versus power, to identify power distribution system components which require development for higher voltage systems and finally to determine what modifications must be made to the Power Distribution System Simulator (PDSS) to demonstrate 300 Vdc distribution capability.

  2. Fabrication and test of digital output interface devices for gas turbine electronic controls

    NASA Technical Reports Server (NTRS)

    Newirth, D. M.; Koenig, E. W.

    1978-01-01

    A program was conducted to develop an innovative digital output interface device, a digital effector with optical feedback of the fuel metering valve position, for future electronic controls for gas turbine engines. A digital effector (on-off solenoids driven directly by on-off signals from a digital electronic controller) with optical position feedback was fabricated, coupled with the fuel metering valve, and tested under simulated engine operating conditions. The testing indicated that a digital effector with optical position feedback is a suitable candidate, with proper development for future digital electronic gas turbine controls. The testing also identified several problem areas which would have to be overcome in a final production configuration.

  3. Development of heat flux sensors for turbine airfoils

    NASA Astrophysics Data System (ADS)

    Atkinson, William H.; Cyr, Marcia A.; Strange, Richard R.

    1985-10-01

    The objectives of this program are to develop heat flux sensors suitable for installation in hot section airfoils of advanced aircraft turbine engines and to experimentally verify the operation of these heat flux sensors in a cylinder in a cross flow experiment. Embedded thermocouple and Gardon gauge sensors were developed and fabricated into both blades and vanes. These were then calibrated using a quartz lamp bank heat source and finally subjected to thermal cycle and thermal soak testing. These sensors were also fabricated into cylindrical test pieces and tested in a burner exhaust to verify heat flux measurements produced by these sensors. The results of the cylinder in cross flow tests are given.

  4. Development of heat flux sensors for turbine airfoils

    NASA Technical Reports Server (NTRS)

    Atkinson, William H.; Cyr, Marcia A.; Strange, Richard R.

    1985-01-01

    The objectives of this program are to develop heat flux sensors suitable for installation in hot section airfoils of advanced aircraft turbine engines and to experimentally verify the operation of these heat flux sensors in a cylinder in a cross flow experiment. Embedded thermocouple and Gardon gauge sensors were developed and fabricated into both blades and vanes. These were then calibrated using a quartz lamp bank heat source and finally subjected to thermal cycle and thermal soak testing. These sensors were also fabricated into cylindrical test pieces and tested in a burner exhaust to verify heat flux measurements produced by these sensors. The results of the cylinder in cross flow tests are given.

  5. A flight-test and simulation evaluation of the longitudinal final approach and landing performance of an automatic system for a light wing loading STOL aircraft

    NASA Technical Reports Server (NTRS)

    Brown, S. C.; Hardy, G. H.; Hindson, W. S.

    1983-01-01

    As part of a comprehensive flight-test program of STOL operating systems for the terminal area, an automatic landing system was developed and evaluated for a light wing loading turboprop aircraft. The aircraft utilized an onboard advanced digital avionics system. Flight tests were conducted at a facility that included a STOL runway site with a microwave landing system. Longitudinal flight-test results were presented and compared with available (basically CTOL) criteria. These comparisons were augmented by results from a comprehensive simulation of the controlled aircraft which included representations of navigation errors that were encountered in flight and atmospheric disturbances. Acceptable performance on final approach and at touchdown was achieved by the autoland (automatic landing) system for the moderate winds and turbulence conditions encountered in flight. However, some touchdown performance goals were marginally achieved, and simulation results suggested that difficulties could be encountered in the presence of more extreme atmospheric conditions. Suggestions were made for improving performance under those more extreme conditions.

  6. Development of an Operational TS Dataset Production System for the Data Assimilation System

    NASA Astrophysics Data System (ADS)

    Kim, Sung Dae; Park, Hyuk Min; Kim, Young Ho; Park, Kwang Soon

    2017-04-01

    An operational TS (Temperature and Salinity) dataset production system was developed to provide near real-time data to the data assimilation system periodically. It collects the latest 15 days' TS data of the north western pacific area (20°N - 55°N, 110°E - 150°E), applies QC tests to the archived data and supplies them to numerical prediction models of KIOST (Korea Institute of Ocean Science and Technology). The latest real-time TS data are collected from Argo GDAC and GTSPP data server every week. Argo data are downloaded from /latest_data directory of Argo GDAC. Because many duplicated data exist when all profile data are extracted from all Argo netCDF files, DB system is used to avoid duplication. All metadata (float ID, location, observation date and time, etc) of all Argo floats is stored into Database system and a Matlab program was developed to manipulate DB data, to check the duplication and to exclude duplicated data. GTSPP data are downloaded from /realtime directory of GTSPP data service. The latest data except ARGO data are extracted from the original data. Another Matlab program was coded to inspect all collected data using 10 QC tests and produce final dataset which can be used by the assimilation system. Three regional range tests to inspect annual, seasonal and monthly variations are included in the QC procedures. The C program was developed to provide regional ranges to data managers. It can calculate upper limit and lower limit of temperature and salinity at depth from 0 to 1550m. The final TS dataset contains the latest 15 days' TS data in netCDF format. It is updated every week and transmitted to numerical modeler of KIOST for operational use.

  7. Project W-314 acceptance test report HNF-4643 for HNF-4642 241-AN-A valve pit manifold valves and position indication for project W-314

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    HAMMERS, J.S.

    1999-09-22

    The purpose of the test was to verify that the AN Tank Farm Manifold Valves can be manually manipulated to the required operating position and that the electrical and visual indications accurately reflect that position. Physical locking devices were also verified to function. The Acceptance Test Procedure HNF-4642, 241-AN-A Valve Pit Manifold Valves and Position Indication was conducted between 23 June and 10 August 1999 at the 200E AN Tank Farm. The test has no open test exceptions. The test was conducted prior to final engineering ''as built'' activities being completed, this had an impact on the procedure and testmore » results, ECN 653752 was written to correct the mismatch between the procedure and actual field conditions. P&ID H-14-100941 was changed via ECN-W-314-4C-120. All components, identified in the procedure, were not found to be labeled and identified as written in the procedure, temporary tags were used for operational identification. A retest of valve ANA-WT-V 318 was required because it was removed from its installed position and modified after testing was completed.« less

  8. 78 FR 21245 - Continuity of Operations Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-10

    ...; Order No. 778] Continuity of Operations Plan AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Final rule. SUMMARY: In this Final Rule the Commission revises its Continuity of Operations Plan... Commission's Continuity of Operations Plan (COOP) regulations to incorporate its regional offices into the...

  9. Technical reference for the use of the slow crack growth test for modeling and predicting the long-term performance of polyethylene gas pipes. Final report, March 1987-May 1992. Volume 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kanninen, M.F.; O'Donoghue, P.E.; Popelar, C.F.

    1993-02-01

    The project was undertaken for the purposes of quantifying the Battelle slow crack growth (SCG) test for predicting long-term performance of polyethylene gas distribution pipes, and of demonstrating the applicability of the methodology for use by the gas industry for accelerated characterization testing, thereby bringing the SCG test development effort to a closure. The work has revealed that the Battelle SCG test, and the linear fracture mechanics interpretation that it currently utilizes, is valid for a class of PE materials. The long-term performance of these materials in various operating conditions can therefore be effectively predicted.

  10. A novel model-based control strategy for aerobic filamentous fungal fed-batch fermentation processes.

    PubMed

    Mears, Lisa; Stocks, Stuart M; Albaek, Mads O; Cassells, Benny; Sin, Gürkan; Gernaey, Krist V

    2017-07-01

    A novel model-based control strategy has been developed for filamentous fungal fed-batch fermentation processes. The system of interest is a pilot scale (550 L) filamentous fungus process operating at Novozymes A/S. In such processes, it is desirable to maximize the total product achieved in a batch in a defined process time. In order to achieve this goal, it is important to maximize both the product concentration, and also the total final mass in the fed-batch system. To this end, we describe the development of a control strategy which aims to achieve maximum tank fill, while avoiding oxygen limited conditions. This requires a two stage approach: (i) calculation of the tank start fill; and (ii) on-line control in order to maximize fill subject to oxygen transfer limitations. First, a mechanistic model was applied off-line in order to determine the appropriate start fill for processes with four different sets of process operating conditions for the stirrer speed, headspace pressure, and aeration rate. The start fills were tested with eight pilot scale experiments using a reference process operation. An on-line control strategy was then developed, utilizing the mechanistic model which is recursively updated using on-line measurements. The model was applied in order to predict the current system states, including the biomass concentration, and to simulate the expected future trajectory of the system until a specified end time. In this way, the desired feed rate is updated along the progress of the batch taking into account the oxygen mass transfer conditions and the expected future trajectory of the mass. The final results show that the target fill was achieved to within 5% under the maximum fill when tested using eight pilot scale batches, and over filling was avoided. The results were reproducible, unlike the reference experiments which show over 10% variation in the final tank fill, and this also includes over filling. The variance of the final tank fill is reduced by over 74%, meaning that it is possible to target the final maximum fill reproducibly. The product concentration achieved at a given set of process conditions was unaffected by the control strategy. Biotechnol. Bioeng. 2017;114: 1459-1468. © 2017 Wiley Periodicals, Inc. © 2017 Wiley Periodicals, Inc.

  11. Water NSTF Design, Instrumentation, and Test Planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lisowski, Darius D.; Gerardi, Craig D.; Hu, Rui

    The following report serves as a formal introduction to the water-based Natural convection Shutdown heat removal Test Facility (NSTF) program at Argonne. Since 2005, this US Department of Energy (DOE) sponsored program has conducted large scale experimental testing to generate high-quality and traceable validation data for guiding design decisions of the Reactor Cavity Cooling System (RCCS) concept for advanced reactor designs. The most recent facility iteration, and focus of this report, is the operation of a 1/2 scale model of a water-RCCS concept. Several features of the NSTF prototype align with the conceptual design that has been publicly released formore » the AREVA 625 MWt SC-HTGR. The design of the NSTF also retains all aspects common to a fundamental boiling water thermosiphon, and thus is well poised to provide necessary experimental data to advance basic understanding of natural circulation phenomena and contribute to computer code validation. Overall, the NSTF program operates to support the DOE vision of aiding US vendors in design choices of future reactor concepts, advancing the maturity of codes for licensing, and ultimately developing safe and reliable reactor technologies. In this report, the top-level program objectives, testing requirements, and unique considerations for the water cooled test assembly are discussed, and presented in sufficient depth to support defining the program’s overall scope and purpose. A discussion of the proposed 6-year testing program is then introduced, which outlines the specific strategy and testing plan for facility operations. The proposed testing plan has been developed to meet the toplevel objective of conducting high-quality test operations that span across a broad range of single- and two-phase operating conditions. Details of characterization, baseline test cases, accident scenario, and parametric variations are provided, including discussions of later-stage test cases that examine the influence of geometric variations and off-normal configurations. The facility design follows, including as-built dimensions and specifications of the various mechanical and liquid systems, design choices for the test section, water storage tank, and network piping. Specifications of the instrumentation suite are then presented, along with specific information on performance windows, measurement uncertainties, and installation locations. Finally, descriptions of the control systems and heat removal networks are provided, which have been engineered to support precise quantification of energy balances and facilitate well-controlled test operations.« less

  12. KSC-2009-2311

    NASA Image and Video Library

    2009-03-26

    CAPE CANAVERAL, Fla. – The first Ares I-X motor segment is in the Rotation, Processing and Surge Facility at NASA's Kennedy Space Center in Florida. It is one of four reusable motor segments and nozzle exit cone shipped by the Ares I first-stage prime contractor Alliant Techsystems Inc. for final processing and integration in the facility. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming flight test this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Jim Grossmann

  13. The development of the Final Approach Spacing Tool (FAST): A cooperative controller-engineer design approach

    NASA Technical Reports Server (NTRS)

    Lee, Katharine K.; Davis, Thomas J.

    1995-01-01

    Historically, the development of advanced automation for air traffic control in the United States has excluded the input of the air traffic controller until the need of the development process. In contrast, the development of the Final Approach Spacing Tool (FAST), for the terminal area controller, has incorporated the end-user in early, iterative testing. This paper describes a cooperative between the controller and the developer to create a tool which incorporates the complexity of the air traffic controller's job. This approach to software development has enhanced the usability of FAST and has helped smooth the introduction of FAST into the operational environment.

  14. 78 FR 16051 - Vehicle/Track Interaction Safety Standards; High-Speed and High Cant Deficiency Operations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-13

    ...FRA is amending the Track Safety Standards and Passenger Equipment Safety Standards to promote the safe interaction of rail vehicles with the track over which they operate under a variety of conditions at speeds up to 220 m.p.h. The final rule revises standards for track geometry and safety limits for vehicle response to track conditions, enhances vehicle/track qualification procedures, and adds flexibility for permitting high cant deficiency train operations through curves at conventional speeds. The rule accounts for a range of vehicle types that are currently in operation, as well as vehicle types that may likely be used in future high-speed or high cant deficiency rail operations, or both. The rule is based on the results of simulation studies designed to identify track geometry irregularities associated with unsafe wheel/rail forces and accelerations, thorough reviews of vehicle qualification and revenue service test data, and consideration of international practices.

  15. X-48B Phase 1 Flight Maneuver Database and ICP Airspace Constraint Analysis

    NASA Technical Reports Server (NTRS)

    Fast, Peter Alan

    2010-01-01

    The work preformed during the Summer 2010 by Peter Fast. The main tasks assigned were to update and improve the X-48 Flight Maneuver Database and conduct an Airspace Constraint Analysis for the Remotely Operated Aircraft Area used to flight test Unmanned Arial Vehicles. The final task was to develop and demonstrate a working knowledge of flight control theory.

  16. High Efficiency, 100 mJ per pulse, Nd:YAG Oscillator Optimized for Space-Based Earth and Planetary Remote Sensing

    NASA Technical Reports Server (NTRS)

    Coyle, D. Barry; Stysley, Paul R.; Poulios, Demetrios; Fredrickson, Robert M.; Kay, Richard B.; Cory, Kenneth C.

    2014-01-01

    We report on a newly solid state laser transmitter, designed and packaged for Earth and planetary space-based remote sensing applications for high efficiency, low part count, high pulse energy scalability/stability, and long life. Finally, we have completed a long term operational test which surpassed 2 Billion pulses with no measured decay in pulse energy.

  17. SELECTIVE DISSEMINATION OF INFORMATION (SDI). VOLUME II, IMPLEMENTATION MANUAL. FINAL REPORT. ARMY TECHNICAL LIBRARY IMPROVEMENT STUDIES (ATLIS), REPORT NO. 16.

    ERIC Educational Resources Information Center

    BIVONA, WILLIAM A.

    A SET OF GUIDELINES FOR IMPLEMENTING AND OPERATING A REPLICA OF A PROTOTYPE SELECTIVE DISSEMINATION OF INFORMATION (SDI) SYSTEM TESTED AT U.S. ARMY NATICK LABORATORIES, AND REPORTED IN LI 000 273, IS GIVEN IN THIS MANUAL. INFORMATION IS SUPPLIED WHICH IS USEFUL IN THE INITIAL STAGES OF IMPLEMENTATION. THE APPLICATION OF SPECIFIC CRITERIA FOR…

  18. Experimental Civilian Personnel Office Project (EXPO): Final Report for Nonappropriated Fund Sites

    DTIC Science & Technology

    1991-07-01

    existing data bases; budgetary data; and other documents provided by the test sites. The results indicate that EXPO initiatives had a positive impact on...EXPO has had a positive impact on NAF operations and profitability of revenue-generating activities has remained stable. Important findings include...appropriate education and training resources are available. v viii VllI CONTENTS INTRO DU CTIO N

  19. Flight qualification of mortar-actuated parachute deployment systems

    NASA Technical Reports Server (NTRS)

    Pleasants, J. E.

    1975-01-01

    A brief discussion outlines background of mortar use in parachute deployment systems. A description of the system operation is presented. Effects of the environment on performance are discussed as well as the instrumentation needed to assess this performance. Power unit qualification and lot qualification for shear pins and cartridges is delineated. Functional mortar system tests are described. Finally, bridle deployment and parachute deployment are discussed.

  20. The demonstration of an advanced cyclone coal combustor, with internal sulfur, nitrogen, and ash control for the conversion of a 23 MMBTU/hour oil fired boiler to pulverized coal

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zauderer, B.; Fleming, E.S.

    1991-08-30

    This work contains to the final report of the demonstration of an advanced cyclone coal combustor. Titles include: Chronological Description of the Clean Coal Project Tests,'' Statistical Analysis of Operating Data for the Coal Tech Combustor,'' Photographic History of the Project,'' Results of Slag Analysis by PA DER Module 1 Procedure,'' Properties of the Coals Limestone Used in the Test Effort,'' Results of the Solid Waste Sampling Performed on the Coal Tech Combustor by an Independent Contractor During the February 1990 Tests.'' (VC)

  1. ICARUS 600 ton: A status report

    NASA Astrophysics Data System (ADS)

    Vignoli, C.; Arneodo, F.; Badertscher, A.; Barbieri, E.; Benetti, P.; di Tigliole, A. Borio; Brunetti, R.; Bueno, A.; Calligarich, E.; Campanelli, M.; Carli, F.; Carpanese, C.; Cavalli, D.; Cavanna, F.; Cennini, P.; Centro, S.; Cesana, A.; Chen, C.; Chen, Y.; Cinquini, C.; Cline, D.; De Mitri, I.; Dolfini, R.; Favaretto, D.; Ferrari, A.; Berzolari, A. Gigli; Goudsmit, P.; He, K.; Huang, X.; Li, Z.; Lu, F.; Ma, J.; Mannocchi, G.; Mauri, F.; Mazza, D.; Mazzone, L.; Montanari, C.; Nurzia, G. P.; Otwinowski, S.; Palamara, O.; Pascoli, D.; Pepato, A.; Periale, L.; Petrera, S.; Piano-Mortari, G.; Piazzoli, A.; Picchi, P.; Pietropaolo, F.; Rancati, T.; Rappoldi, A.; Raselli, G. L.; Rebuzzi, D.; Revol, J. P.; Rico, J.; Rossella, M.; Rossi, C.; Rubbia, A.; Rubbia, C.; Sala, P.; Scannicchio, D.; Sergiampietri, F.; Suzuki, S.; Terrani, M.; Ventura, S.; Verdecchia, M.; Wang, H.; Woo, J.; Xu, G.; Xu, Z.; Zhang, C.; Zhang, Q.; Zheng, S.

    2000-05-01

    The goal of the ICARUS Project is the installation of a multi-kiloton LAr TPC in the underground Gran Sasso Laboratory. The programme foresees the realization of the detector in a modular way. The first step is the construction of a 600 ton module which is now at an advanced phase. It will be mounted and tested in Pavia in one year and then it will be moved to Gran Sasso for the final operation. The major cryogenic and purification systems and the mechanical components of the detector have been constructed and tested in a 10 m 3 prototype. The results of these tests are here summarized.

  2. Preliminary results of geothermal desalting operations at the East Mesa test site Imperial Valley, California

    NASA Technical Reports Server (NTRS)

    Suemoto, S. H.; Mathias, K. E.

    1974-01-01

    The Bureau of Reclamation has erected at its Geothermal Resource Development site two experimental test vehicles for the purpose of desalting hot fluids of geothermal origin. Both plants have as a feed source geothermal well Mesa 6-1 drilled to a total depth of 8,030 feet and having a bottom hole temperature of 400 F. Formation fluid collected at the surface contained 24,800 mg/1 total dissolved solids. The dissolved solids consist mainly of sodium chloride. A multistage distillation (3-stage) plant has been operated intermittently for one year with no operational problems. Functioning at steady-state conditions with a liquid feed rate of 70 g/m and a temperature of 221 F, the final brine blowdown temperature was 169 F. Product water was produced at a rate of about 2 g/m; average total dissolved solids content of the product was 170 mg/1. A product quality of 27.5 mg/1 at a pH of 9.5 was produced from the first stage.

  3. Around Marshall

    NASA Image and Video Library

    1972-01-01

    This is a cutaway illustration of the Neutral Buoyancy Simulator (NBS) at the Marshall Space Flight Center (MSFC ). The MSFC NBS provided an excellent environment for testing hardware to examine how it would operate in space and for evaluating techniques for space construction and spacecraft servicing. Here, engineers, designers, and astronauts performed various tests to develop basic concepts, preliminary designs, final designs, and crew procedures. The NBS was constructed of welded steel with polyester-resin coating. The water tank was 75-feet (22.9- meters) in diameter, 40-feet (12.2-meters) deep, and held 1.32 million gallons of water. Since it opened for operation in 1968, the NBS had supported a number of successful space missions, such as the Skylab, Solar Maximum Mission Satellite, Marned Maneuvering Unit, Experimental Assembly of Structures in Extravehicular Activity/Assembly Concept for Construction of Erectable Space Structures (EASE/ACCESS), the Hubble Space Telescope, and the Space Station. The function of the MSFC NBS was moved to the larger simulator at the Johnson Space Center and is no longer operational.

  4. End-to-end simulation and verification of GNC and robotic systems considering both space segment and ground segment

    NASA Astrophysics Data System (ADS)

    Benninghoff, Heike; Rems, Florian; Risse, Eicke; Brunner, Bernhard; Stelzer, Martin; Krenn, Rainer; Reiner, Matthias; Stangl, Christian; Gnat, Marcin

    2018-01-01

    In the framework of a project called on-orbit servicing end-to-end simulation, the final approach and capture of a tumbling client satellite in an on-orbit servicing mission are simulated. The necessary components are developed and the entire end-to-end chain is tested and verified. This involves both on-board and on-ground systems. The space segment comprises a passive client satellite, and an active service satellite with its rendezvous and berthing payload. The space segment is simulated using a software satellite simulator and two robotic, hardware-in-the-loop test beds, the European Proximity Operations Simulator (EPOS) 2.0 and the OOS-Sim. The ground segment is established as for a real servicing mission, such that realistic operations can be performed from the different consoles in the control room. During the simulation of the telerobotic operation, it is important to provide a realistic communication environment with different parameters like they occur in the real world (realistic delay and jitter, for example).

  5. Fuel use control in the fishing industry. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Billington, G.

    1985-08-01

    The project undertook fuel flow monitoring of a random sample of fishing vessels in the New Zealand fishing industry. The object of the project was to determine the value of fuel flow measurement on a range of vessels of differing size and fishing method, and to investigate the effect on fuel consumption of hull fouling and propeller repitching where this appeared to be required. Eight vessels in the port of Tauranga were included in the trials. Three of these are company-owned and operated and the remainder are owner-operated. One purse seiner, two longliners and five trawlers (pair and single) weremore » involved. Fuel flow measurements were carried out, with before-and-after tests on one vessel to determine the value of removing hull fouling. In two cases propeller repitching was undertaken. The tests demonstrated that five of the eight vessels could, through minor operational changes, make significant fuel conservation gains with minimal loss of performance.« less

  6. Initial Operation and Shakedown of the Nuclear Thermal Rocket Element Environmental Simulator (NTREES)

    NASA Technical Reports Server (NTRS)

    Emrich, William J., Jr.

    2014-01-01

    To support the on-going nuclear thermal propulsion effort, a state-of-the-art non nuclear experimental test setup has been constructed to evaluate the performance characteristics of candidate fuel element materials and geometries in representative environments. The facility to perform this testing is referred to as the Nuclear Thermal Rocket Element Environment Simulator (NTREES). This device can simulate the environmental conditions (minus the radiation) to which nuclear rocket fuel components will be subjected during reactor operation. Prototypical fuel elements mounted in the simulator are inductively heated in such a manner so as to accurately reproduce the temperatures and heat fluxes which would normally occur as a result of nuclear fission in addition to being exposed to flowing hydrogen. Recent upgrades to NTREES now allow power levels 24 times greater than those achievable in the previous facility configuration. This higher power operation will allow near prototypical power densities and flows to finally be achieved in most prototypical fuel elements.

  7. Coulomb branch operators and mirror symmetry in three dimensions

    NASA Astrophysics Data System (ADS)

    Dedushenko, Mykola; Fan, Yale; Pufu, Silviu S.; Yacoby, Ran

    2018-04-01

    We develop new techniques for computing exact correlation functions of a class of local operators, including certain monopole operators, in three-dimensional N=4 abelian gauge theories that have superconformal infrared limits. These operators are position-dependent linear combinations of Coulomb branch operators. They form a one-dimensional topological sector that encodes a deformation quantization of the Coulomb branch chiral ring, and their correlation functions completely fix the ( n ≤ 3)-point functions of all half-BPS Coulomb branch operators. Using these results, we provide new derivations of the conformal dimension of half-BPS monopole operators as well as new and detailed tests of mirror symmetry. Our main approach involves supersymmetric localization on a hemisphere HS 3 with half-BPS boundary conditions, where operator insertions within the hemisphere are represented by certain shift operators acting on the HS 3 wavefunction. By gluing a pair of such wavefunctions, we obtain correlators on S 3 with an arbitrary number of operator insertions. Finally, we show that our results can be recovered by dimensionally reducing the Schur index of 4D N=2 theories decorated by BPS 't Hooft-Wilson loops.

  8. Herd factors associated with dairy cow mortality.

    PubMed

    McConnel, C; Lombard, J; Wagner, B; Kopral, C; Garry, F

    2015-08-01

    Summary studies of dairy cow removal indicate increasing levels of mortality over the past several decades. This poses a serious problem for the US dairy industry. The objective of this project was to evaluate associations between facilities, herd management practices, disease occurrence and death rates on US dairy operations through an analysis of the National Animal Health Monitoring System's Dairy 2007 survey. The survey included farms in 17 states that represented 79.5% of US dairy operations and 82.5% of the US dairy cow population. During the first phase of the study operations were randomly selected from a sampling list maintained by the National Agricultural Statistics Service. Only farms that participated in phase I and had 30 or more dairy cows were eligible to participate in phase II. In total, 459 farms had complete data for all selected variables and were included in this analysis. Univariable associations between dairy cow mortality and 162 a priori identified operation-level management practices or characteristics were evaluated. Sixty of the 162 management factors explored in the univariate analysis met initial screening criteria and were further evaluated in a multivariable model exploring more complex relationships. The final weighted, negative binomial regression model included six variables. Based on the incidence rate ratio, this model predicted 32.0% less mortality for operations that vaccinated heifers for at least one of the following: bovine viral diarrhea, infectious bovine rhinotracheitis, parainfluenza 3, bovine respiratory syncytial virus, Haemophilus somnus, leptospirosis, Salmonella, Escherichia coli or clostridia. The final multivariable model also predicted a 27.0% increase in mortality for operations from which a bulk tank milk sample tested ELISA positive for bovine leukosis virus. Additionally, an 18.0% higher mortality was predicted for operations that used necropsies to determine the cause of death for some proportion of dead dairy cows. The final model also predicted that increased proportions of dairy cows with clinical mastitis and infertility problems were associated with increased mortality. Finally, an increase in mortality was predicted to be associated with an increase in the proportion of lame or injured permanently removed dairy cows. In general terms, this model identified that mortality was associated with reproductive problems, non-infectious postpartum disease, infectious disease and infectious disease prevention, and information derived from postmortem evaluations. Ultimately, addressing excessive mortality levels requires a concerted effort that recognizes and appropriately manages the numerous and diverse underlying risks.

  9. Drive and protection circuit for converter module of cascaded H-bridge STATCOM

    NASA Astrophysics Data System (ADS)

    Wang, Xuan; Yuan, Hongliang; Wang, Xiaoxing; Wang, Shuai; Fu, Yongsheng

    2018-04-01

    Drive and protection circuit is an important part of power electronics, which is related to safe and stable operation issues in the power electronics. The drive and protection circuit is designed for the cascaded H-bridge STATCOM. This circuit can realize flexible dead-time setting, operation status self-detection, fault priority protection and detailed fault status uploading. It can help to improve the reliability of STATCOM's operation. Finally, the proposed circuit is tested and analyzed by power electronic simulation software PSPICE (Simulation Program with IC Emphasis) and a series of experiments. Further studies showed that the proposed circuit can realize drive and control of H-bridge circuit, meanwhile it also can realize fast processing faults and have advantage of high reliability.

  10. Test and evaluation of load converter topologies used in the Space Station Freedom power management and distribution dc test bed

    NASA Technical Reports Server (NTRS)

    Lebron, Ramon C.; Oliver, Angela C.; Bodi, Robert F.

    1991-01-01

    Power components hardware in support of the Space Station freedom dc Electric Power System were tested. One type of breadboard hardware tested is the dc Load Converter Unit, which constitutes the power interface between the electric power system and the actual load. These units are dc to dc converters that provide the final system regulation before power is delivered to the load. Three load converters were tested: a series resonant converter, a series inductor switch-mode converter, and a switching full-bridge forward converter. The topology, operation principles, and test results are described, in general. A comparative analysis of the three units is given with respect to efficiency, regulation, short circuit behavior (protection), and transient characteristics.

  11. HYDRA, a new tool for mechanical testing

    NASA Technical Reports Server (NTRS)

    Brinkmann, P. W.

    1994-01-01

    The introduction outlines the verification concept for programs of the European Space Agency (ESA). The role of the Agency in coordinating the activities of major European space test centers is summarized. Major test facilities of the environmental test center at ESTEC, the Space Research and Technology Center of ESA, are shown and their specific characteristics are highlighted with special emphasis on the 6-degree-of-freedom (6-DOF) hydraulic shaker. The specified performance characteristics for sine and transient tests are presented. Results of single-axis hardware tests and 6-DOF computer simulations are included. Efforts employed to protect payloads against accidental damage in case of malfunctions of the facility are listed. Finally the operational advantages of the facility, as well as the possible use of the HYDRA control system design for future applications are indicated.

  12. KSC-2014-2867

    NASA Image and Video Library

    2014-06-08

    CAPE CANAVERAL, Fla. -- Inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, the Orion service module has been secured in the Final Assembly and System Testing, or FAST, cell. The Orion crew module will be stacked on the service module in the FAST cell and then both modules will be put through their final system tests for Exploration Flight Test-1, or EFT-1, before rolling out of the facility for integration with the United Launch Alliance Delta IV Heavy rocket. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of Orion, EFT-1, is scheduled to launch later this year atop a Delta IV rocket from Cape Canaveral Air Force Station in Florida to an altitude of 3,600 miles above the Earth's surface. The two-orbit, four-hour flight test will help engineers evaluate the systems critical to crew safety including the heat shield, parachute system and launch abort system. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Glenn Benson

  13. KSC-2014-2866

    NASA Image and Video Library

    2014-06-08

    CAPE CANAVERAL, Fla. -- Inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, the Orion service module has been secured in the Final Assembly and System Testing, or FAST, cell. The Orion crew module will be stacked on the service module in the FAST cell and then both modules will be put through their final system tests for Exploration Flight Test-1, or EFT-1, before rolling out of the facility for integration with the United Launch Alliance Delta IV Heavy rocket. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of Orion, EFT-1, is scheduled to launch later this year atop a Delta IV rocket from Cape Canaveral Air Force Station in Florida to an altitude of 3,600 miles above the Earth's surface. The two-orbit, four-hour flight test will help engineers evaluate the systems critical to crew safety including the heat shield, parachute system and launch abort system. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Glenn Benson

  14. A New Wideband, Fully Steerable, Decametric Array at Clark Lake

    NASA Technical Reports Server (NTRS)

    Erickson, W. C.; Fisher, J. R.

    1974-01-01

    A fully steerable, decametric array for radio astronomy is under construction at the Clark Lake Radio Observatory near Borrego Springs, California. This array will be a T of 720 conical spiral antennas (teepee-shaped antennas, hence the array is called the TPT), 3.0 km by 1.8 km capable of operating between 15 and 125 MHz. Both its operating frequency and beam position will be adjustable in less than one millisecond, and the TPT will provide a 49-element picture around the central beam position for extended source observations. Considerable experience was gained in the operation of completed portions of the array, and successful operation of the final array is assured. The results are described of the tests which were conducted with the conical spirals, and the planned electronics and data processing systems are described.

  15. Electrostatic Discharge Test of Multi-Junction Solar Array Coupons After Combined Space Environmental Exposures

    NASA Technical Reports Server (NTRS)

    Wright, Kenneth H.; Schneider, Todd; Vaughn, Jason; Hoang, Bao; Funderburk, Victor V.; Wong, Frankie; Gardiner, George

    2010-01-01

    A set of multi-junction GaAs/Ge solar array test coupons were subjected to a sequence of 5-year increments of combined environmental exposure tests. The test coupons capture an integrated design intended for use in a geosynchronous (GEO) space environment. A key component of this test campaign is conducting electrostatic discharge (ESD) tests in the inverted gradient mode. The protocol of the ESD tests is based on the ISO/CD 11221, the ISO standard for ESD testing on solar array panels. This standard is currently in its final review with expected approval in 2010. The test schematic in the ISO reference has been modified with Space System/Loral designed circuitry to better simulate the on-orbit operational conditions of its solar array design. Part of the modified circuitry is to simulate a solar array panel coverglass flashover discharge. All solar array coupons used in the test campaign consist of 4 cells. The ESD tests are performed at the beginning of life (BOL) and at each 5-year environment exposure point. The environmental exposure sequence consists of UV radiation, electron/proton particle radiation, thermal cycling, and ion thruster plume. This paper discusses the coverglass flashover simulation, ESD test setup, and the importance of the electrical test design in simulating the on-orbit operational conditions. Results from 5th-year testing are compared to the baseline ESD characteristics determined at the BOL condition.

  16. Multicenter study of pectus excavatum, final report: complications, static/exercise pulmonary function, and anatomic outcomes.

    PubMed

    Kelly, Robert E; Mellins, Robert B; Shamberger, Robert C; Mitchell, Karen K; Lawson, M Louise; Oldham, Keith T; Azizkhan, Richard G; Hebra, Andre V; Nuss, Donald; Goretsky, Michael J; Sharp, Ronald J; Holcomb, George W; Shim, Walton K T; Megison, Stephen M; Moss, R Lawrence; Fecteau, Annie H; Colombani, Paul M; Cooper, Dan; Bagley, Traci; Quinn, Amy; Moskowitz, Alan B; Paulson, James F

    2013-12-01

    A multicenter study of pectus excavatum was described previously. This report presents our final results. Patients treated surgically at 11 centers were followed prospectively. Each underwent a preoperative evaluation with CT scan, pulmonary function tests, and body image survey. Data were collected about associated conditions, complications, and perioperative pain. One year after treatment, patients underwent repeat chest CT scan, pulmonary function tests, and body image survey. A subset of 50 underwent exercise pulmonary function testing. Of 327 patients, 284 underwent Nuss procedure and 43 underwent open procedure without mortality. Of 182 patients with complete follow-up (56%), 18% had late complications, similarly distributed, including substernal bar displacement in 7% and wound infection in 2%. Mean initial CT scan index of 4.4 improved to 3.0 post operation (severe >3.2, normal = 2.5). Computed tomography index improved at the deepest point (xiphoid) and also upper and middle sternum. Pulmonary function tests improved (forced vital capacity from 88% to 93%, forced expiratory volume in 1 second from 87% to 90%, and total lung capacity from 94% to 100% of predicted (p < 0.001 for each). VO2 max during peak exercise increased by 10.1% (p = 0.015) and O2 pulse by 19% (p = 0.007) in 20 subjects who completed both pre- and postoperative exercise tests. There is significant improvement in lung function at rest and in VO2 max and O2 pulse after surgical correction of pectus excavatum, with CT index >3.2. Operative correction significantly reduces CT index and markedly improves the shape of the entire chest, and can be performed safely in a variety of centers. Copyright © 2013 American College of Surgeons. Published by Elsevier Inc. All rights reserved.

  17. FY94 CAG trip reports, CAG memos and other products: Volume 2. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-12-15

    The Yucca Mountain Site Characterization Project (YMP) of the US DOE is tasked with designing, constructing, and operating an Exploratory Studies Facility (ESF) at Yucca Mountain, Nevada. The purpose of the YMP is to provide detailed characterization of the Yucca Mountain site for the potential mined geologic repository for permanent disposal of high-level radioactive waste. Detailed characterization of properties of the site are to be conducted through a wide variety of short-term and long-term in-situ tests. Testing methods require the installation of a large number of test instruments and sensors with a variety of functions. These instruments produce analog andmore » digital data that must be collected, processed, stored, and evaluated in an attempt to predict performance of the repository. The Integrated Data and Control System (IDCS) is envisioned as a distributed data acquisition that electronically acquires and stores data from these test instruments. IDCS designers are responsible for designing and overseeing the procurement of the system, IDCS Operation and Maintenance operates and maintains the installed system, and the IDCS Data Manager is responsible for distribution of IDCS data to participants. This report is a compilation of trip reports, interoffice memos, and other memos relevant to Computer Applications Group, Inc., work on this project.« less

  18. NASA Countermeasures Evaluation and Validation Project

    NASA Technical Reports Server (NTRS)

    Lundquist, Charlie M.; Paloski, William H. (Technical Monitor)

    2000-01-01

    To support its ISS and exploration class mission objectives, NASA has developed a Countermeasure Evaluation and Validation Project (CEVP). The goal of this project is to evaluate and validate the optimal complement of countermeasures required to maintain astronaut health, safety, and functional ability during and after short- and long-duration space flight missions. The CEVP is the final element of the process in which ideas and concepts emerging from basic research evolve into operational countermeasures. The CEVP is accomplishing these objectives by conducting operational/clinical research to evaluate and validate countermeasures to mitigate these maladaptive responses. Evaluation is accomplished by testing in space flight analog facilities, and validation is accomplished by space flight testing. Both will utilize a standardized complement of integrated physiological and psychological tests, termed the Integrated Testing Regimen (ITR) to examine candidate countermeasure efficacy and intersystem effects. The CEVP emphasis is currently placed on validating the initial complement of ISS countermeasures targeting bone, muscle, and aerobic fitness; followed by countermeasures for neurological, psychological, immunological, nutrition and metabolism, and radiation risks associated with space flight. This presentation will review the processes, plans, and procedures that will enable CEVP to play a vital role in transitioning promising research results into operational countermeasures necessary to maintain crew health and performance during long duration space flight.

  19. Automatic small target detection in synthetic infrared images

    NASA Astrophysics Data System (ADS)

    Yardımcı, Ozan; Ulusoy, Ä.°lkay

    2017-05-01

    Automatic detection of targets from far distances is a very challenging problem. Background clutter and small target size are the main difficulties which should be solved while reaching a high detection performance as well as a low computational load. The pre-processing, detection and post-processing approaches are very effective on the final results. In this study, first of all, various methods in the literature were evaluated separately for each of these stages using the simulated test scenarios. Then, a full system of detection was constructed among available solutions which resulted in the best performance in terms of detection. However, although a precision rate as 100% was reached, the recall values stayed low around 25-45%. Finally, a post-processing method was proposed which increased the recall value while keeping the precision at 100%. The proposed post-processing method, which is based on local operations, increased the recall value to 65-95% in all test scenarios.

  20. Corrosion performance of alternative steam generator materials and designs. Volume 2. Posttest examination of a seawater-faulted alternative materials model steam generator. Final report. [PWR

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krupowicz, J.J.; Scott, D.B.; Fink, G.C.

    Corrosion results obtained from the post-test non-destructive and destructive examinations of an alternative materials model steam generator are described in this final report. The model operated under representative thermal and hydraulic and accelerated (high seawater contaminant concentration) steam generator secondary water chemistry conditions. Total exposure consisted of 114 steaming days under all volatile treatment (AVT) chemistry conditions followed by 282 fault steaming days at a 30 ppM chloride concentration in the secondary bulk water. Various support plate and lattice strip support designs incorporated Types 347, 405, 409 and SCR-3 stainless steels; Alloys 600 and 690; and carbon steel. Heat transfermore » tube materials included Alloy 600 in various heat treated conditions, Alloy 690, and Alloy 800. All tubing materials in this test exhibited moderate pitting, primarily in the sludge pile region above the tubesheet.« less

  1. Corrosion performance of alternative steam generator materials and designs. Volume 3. Posttest examination of a freshwater-faulted alternative materials model steam generator. Final report. [PWR

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krupowicz, J.J.; Scott, D.B.; Rentler, R.M.

    Corrosion results obtained from the post-test non-destructive and destructive examinations of an alternative materials model steam generator are described in this final report. The model operated under representative thermal and hydraulic and accelerated (high fresh water contaminant concentration) steam generator secondary water chemistry conditions. Total exposure consisted of 114 steaming days under all volatile treatment (AVT) chemistry conditions followed by 358 fault steaming days at a 40 ppM sulfate concentration in the secondary bulk water. Various support plate and lattice strip support designs incorporated Types 347, 405, 409 and SCR-3 stainless steels; Alloys 600 and 690; and carbon steel. Heatmore » transfer tube materials included Alloy 600 in various heat treated conditions, Alloy 690, and Alloy 800. All tubing materials in this test exhibited significant general corrosion beneath thick surface deposits.« less

  2. Final design of thermal diagnostic system in SPIDER ion source

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brombin, M., E-mail: matteo.brombin@igi.cnr.it; Dalla Palma, M.; Pasqualotto, R.

    The prototype radio frequency source of the ITER heating neutral beams will be first tested in SPIDER test facility to optimize H{sup −} production, cesium dynamics, and overall plasma characteristics. Several diagnostics will allow to fully characterise the beam in terms of uniformity and divergence and the source, besides supporting a safe and controlled operation. In particular, thermal measurements will be used for beam monitoring and system protection. SPIDER will be instrumented with mineral insulated cable thermocouples, both on the grids, on other components of the beam source, and on the rear side of the beam dump water cooled elements.more » This paper deals with the final design and the technical specification of the thermal sensor diagnostic for SPIDER. In particular the layout of the diagnostic, together with the sensors distribution in the different components, the cables routing and the conditioning and acquisition cubicles are described.« less

  3. An integrated electrocoagulation-phytoremediation process for the treatment of mixed industrial wastewater.

    PubMed

    Cano, Rodríguez Claudia Teodora; Amaya-Chávez, Araceli; Roa-Morales, Gabriela; Barrera-Díaz, Carlos Eduardo; Ureña-Núñez, Fernando

    2010-01-01

    The elimination of organic contaminants in highly complex wastewater was tested using a combination of the techniques: electrocoagulation with aluminum electrodes and phytoremediation with Myriophyllum aquaticum. Under optimal operating conditions at a pH of 8 and a current density of 45.45 A m(-2), the electrochemical method produces partial elimination of contaminants, which was improved using phytoremediation as a polishing technique. The combined treatment reduced chemical oxygen demand (COD) by 91%, color by 97% and turbidity by 98%. Initial and final values of contaminants in wastewaters were monitored using UV-vis spectrometry and cyclic voltammetry. Finally, the morphology and the elemental composition of the biomass were characterized with using scanning electron microscopy (SEM) and energy dispersion spectroscopy (EDS). The presence of Al in the roots of plants in the system indicates that the aluminum present in the test solution could be absorbed.

  4. KSC-2009-2202

    NASA Image and Video Library

    2009-03-19

    CAPE CANAVERAL, Fla. – The Florida East Coast Railway train arrives at the Jay Jay Rail Yard with the booster segments for the Ares I-X test rocket for interchange with the NASA Railroad. Officials from Alliant Techsystems Inc. and NASA accompany the train. The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida. The segments will be delivered to the Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Kim Shiflett

  5. Injector Design Tool Improvements: User's manual for FDNS V.4.5

    NASA Technical Reports Server (NTRS)

    Chen, Yen-Sen; Shang, Huan-Min; Wei, Hong; Liu, Jiwen

    1998-01-01

    The major emphasis of the current effort is in the development and validation of an efficient parallel machine computational model, based on the FDNS code, to analyze the fluid dynamics of a wide variety of liquid jet configurations for general liquid rocket engine injection system applications. This model includes physical models for droplet atomization, breakup/coalescence, evaporation, turbulence mixing and gas-phase combustion. Benchmark validation cases for liquid rocket engine chamber combustion conditions will be performed for model validation purpose. Test cases may include shear coaxial, swirl coaxial and impinging injection systems with combinations LOXIH2 or LOXISP-1 propellant injector elements used in rocket engine designs. As a final goal of this project, a well tested parallel CFD performance methodology together with a user's operation description in a final technical report will be reported at the end of the proposed research effort.

  6. Final design of thermal diagnostic system in SPIDER ion source

    NASA Astrophysics Data System (ADS)

    Brombin, M.; Dalla Palma, M.; Pasqualotto, R.; Pomaro, N.

    2016-11-01

    The prototype radio frequency source of the ITER heating neutral beams will be first tested in SPIDER test facility to optimize H- production, cesium dynamics, and overall plasma characteristics. Several diagnostics will allow to fully characterise the beam in terms of uniformity and divergence and the source, besides supporting a safe and controlled operation. In particular, thermal measurements will be used for beam monitoring and system protection. SPIDER will be instrumented with mineral insulated cable thermocouples, both on the grids, on other components of the beam source, and on the rear side of the beam dump water cooled elements. This paper deals with the final design and the technical specification of the thermal sensor diagnostic for SPIDER. In particular the layout of the diagnostic, together with the sensors distribution in the different components, the cables routing and the conditioning and acquisition cubicles are described.

  7. A 100 MV cryomodule for CW operation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Charles Reece

    2005-07-10

    A cryomodule designed for high-gradient CW operation has been built at Jefferson Lab. The Renascence cryomodule is the final prototype of a design for use in the 12 GeV CEBAF upgrade. The module uses eight 7-cell 1497 MHz cavities to be individually powered by 13 kW klystrons. Specifications call for providing >109 MV CW with < 250 W of dynamic heat at 2.07 K. The module incorporates a new generation of tuners and higher power input waveguides. A mixture of the new HG and LL cavity shapes are used. A new high thermal conductivity RF feedthrough has been developed andmore » used on the 32 HOM coupler probes of Renascence. The cryomodule assembly is complete. Testing is to begin late June. Design features and initial test data will be presented.« less

  8. Maglev program test plan. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    deBenedet, D.; Gilchrist, A.J.; Karanian, L.A.

    1992-07-01

    Maglev systems represent a promising evolution in the high-speed ground transportation, offering speeds in excess of 300 mph along with the potential for low operating costs and minimal environmental impact. The goal of this effort is to investigate the feasibility and viability of maglev systems in the United States. The emergence of a sophisticated technology such as maglev requires a need for a coordinated research test program and the determination of test requirements to identify and mitigate development risk and to maximize the use of domestic resources. The study is directed toward the identification and characterization of maglev systems developmentmore » risks tied to a preliminary system architecture. Research objectives are accomplished by surveying experiences from previous maglev development programs, both foreign and domestic, and interviews with individuals involved with maglev research and testing. Findings include ninety-four distinct development risks and twenty risk types. Planning and implementation requirements are identified for a maglev test program, including the development of a facilities strategy to meet any operational concepts that evolve out of early development effort. Also specified is the logical development flow and associated long-lead support needs for sub-scale and full-scale testing.« less

  9. CONCEPTUAL DESIGN ASSESSMENT FOR THE CO-FIRING OF BIO-REFINERY SUPPLIED LIGNIN PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ted Berglund; Jeffrey T. Ranney; Carol L. Babb

    2001-01-01

    The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates have been completed and issued for review. Processing of bio-solids was completed, providing material for the pilot operations. Pilot facility design, equipment selection, and modification were completed during the fourth quarter. Initial pilot facility shakedown was completed during the fourth quarter. During pilot plant shakedown operations, several production batch test runs were performed. These pilot tests were coupled with laboratory testing to confirm pilot results. In initial batches of operations, cellulose to glucose conversionsmore » of 62.5% and 64.8% were observed in laboratory hydrolysis. As part of this testing, lignin dewatering was tested using laboratory and vendor-supplied filtration equipment. Dewatering tests reported moisture contents in the lignin of between 50% and 60%. Dewatering parameters and options will continue to be investigated during lignin production. After some unavoidable delays, a suitable representative supply of MSW feed material was procured. Shredding of the feed material was completed and final drying of the feed is expected to be completed by late January. Once feed drying is completed, pilot facility production will begin to produce lignin for co-fire testing. Facility modifications are expected to continue to improve facility operations and performance during the first quarter of 2001. The TVA-Colbert facility continues to make progress in evaluating the co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The preferred steam supply connection points and steam pipeline routing have been identified. The environmental review of the pipeline routing has been completed and no major impacts have been identified. Detailed assessment of steam export impacts on the Colbert boiler system continues.« less

  10. 77 FR 6112 - Notice of Final National Pollutant Discharge Elimination System (NPDES) General Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-07

    ... Elimination System (NPDES) General Permit for Discharges From Concentrated Animal Feeding Operations (CAFOs... permit for discharges from eligible owners/operators of concentrated animal feeding operations (CAFOs... of the final permit, animal feeding operations that are defined as CAFOs or designated as CAFOs by...

  11. 77 FR 11585 - Notice of Availability of the Aspinall Unit Operations Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ... Operations Final Environmental Impact Statement, Wayne N. Aspinall Unit, Colorado River Storage Project... SUMMARY: The Bureau of Reclamation (Reclamation), the Federal agency responsible for operation of the... Aspinall Unit operations, Gunnison and Montrose Counties, Colorado. DATES: Reclamation will not make a...

  12. Air-to-air radar flight testing

    NASA Astrophysics Data System (ADS)

    Scott, Randall E.

    1988-06-01

    This volume in the AGARD Flight Test Techniques Series describes flight test techniques, flight test instrumentation, ground simulation, data reduction and analysis methods used to determine the performance characteristics of a modern air-to-air (a/a) radar system. Following a general coverage of specification requirements, test plans, support requirements, development and operational testing, and management information systems, the report goes into more detailed flight test techniques covering a/a radar capabilities of: detection, manual acquisition, automatic acquisition, tracking a single target, and detection and tracking of multiple targets. There follows a section on additional flight test considerations such as electromagnetic compatibility, electronic countermeasures, displays and controls, degraded and backup modes, radome effects, environmental considerations, and use of testbeds. Other sections cover ground simulation, flight test instrumentation, and data reduction and analysis. The final sections deal with reporting and a discussion of considerations for the future and how they may affect radar flight testing.

  13. Biomechanical study of anterior spinal instrumentation configurations

    PubMed Central

    Cloutier, Luc P.; Grimard, Guy

    2007-01-01

    The biomechanical impact of the surgical instrumentation configuration for spine surgery is hard to evaluate by the surgeons in pre-operative situation. This study was performed to evaluate different configurations of the anterior instrumentation of the spine, with simulated post-operative conditions, to recommend configurations to the surgeons. Four biomechanical parameters of the anterior instrumentation with simulated post-operative conditions have been studied. They were the screw diameter (5.5–7.5 mm) and its angle (0°–22.5°), the bone grip of the screw (mono–bi cortical) and the amount of instrumented levels (5–8). Eight configurations were tested using an experimental plan with instrumented synthetic spinal models. A follower load was applied and the models were loaded in flexion, torsion and lateral bending. At 5 Nm, average final stiffness was greater in flexion (0.92 Nm/°) than in lateral bending (0.56 Nm/°) and than in torsion (0.26 Nm/°). The screw angle was the parameter influencing the most the final stiffness and the coupling behaviors. It has a significant effect (p ≤ 0.05) on increasing the final stiffness for a 22.5° screw angle in flexion and for a coronal screw angle (0°) in lateral bending. The bi-cortical bone grip of the screw significantly increased the initial stiffness in flexion and lateral bending. Mathematical models representing the behavior of an instrumented spinal model have been used to identify optimal instrumentation configurations. A variation of the angle of the screw from 22.5° to 0° gave a global final stiffness diminution of 13% and a global coupling diminution of 40%. The screw angle was the most important parameter affecting the stiffness and the coupling of the instrumented spine with simulated post-operative conditions. Information about the effect of four different biomechanical parameters will be helpful in preoperative situations to guide surgeons in their clinical choices. PMID:17205240

  14. Final construction and testing of an experimental sprinkler/groundwater treatment system for proposed use by the village of Utica, Nebraska.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2005-06-17

    The testing described above demonstrates that the experimental sprinkler designed by Argonne could be successfully, and safely, used by the Village of Utica for irrigation of the town's playing fields, using contaminated (by carbon tetrachloride) groundwater from the shallow aquifer beneath the town. Routine operation of the sprinkler within the range of parameters identified by the testing program would effectively reduce carbon tetrachloride concentrations in the discharged spray reaching the ground to levels below the MCL (5 {micro}g/l). CCC/USDA and Argonne propose to test use of the experimental sprinkler by the Village of Utica during the next (Summer 2001) growingmore » season, under Argonne supervision. Water will be supplied from the well to the sprinkler drive unit using a temporary, flexible (high-pressure hose) connection. Argonne will provide training to Village staff in the setup and use of the sprinkler, and will conduct periodic monitoring (proposed biweekly, initially) of the watering operations and sampling and analysis of the spray discharge from the unit, to ensure that the specified groundwater cleanup performance of the sprinkler system (to carbon tetrachloride values <5 {micro}g/L) is maintained. If testing of the sprinkler in this manner proves successful during 2001, CCC/USDA will seek to permanently transfer ownership and operation responsibilities for the sprinkler to the Utica Village Board.« less

  15. A microprocessor tester for the treat upgrade reactor trip system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lenkszus, F.R.; Bucher, R.G.

    1985-02-01

    The upgrading of the Transient Reactor Test (TREAT) Facility at ANL-Idaho has been designed to provide additional experimental capabilities for the study of core disruptive accident (CDA) phenomena. To improve the analytical extrapolation of test results to full-size assembly bundles, the facility upgrade will increase the maximum size of the test bundle from 7 to 37 fuel pins. By creating a core convertor zone around the test location, the neutron spectrum incident on the test assembly will be hardened and the maximum energy deposited in the sample will be increased. In addition, a programmable Automated Reactor Control System (ARCS) willmore » permit high-power transients up to 11,000 MW having a controlled reactor period of from 15 to 0.1 sec. These modifications to the core neutronics will improve simulation of LMFBR accident conditions. Finally, a sophisticated, multiply-redundant safety system, the Reactor Trip System (RTS), will provide safe operation for both steady state and transient production operating modes. To insure that this complex safety system is functioning properly, a Dedicated Microprocessor Tester (DMT) has been implemented to perform a thorough checkout of the RTS prior to all TREAT operations. A quantitative reliability analysis of the RTS shows that the unreliability, that is, the probability of failure, is acceptable for a 10 hour mission time or risk interval.« less

  16. Data pieces-based parameter identification for lithium-ion battery

    NASA Astrophysics Data System (ADS)

    Gao, Wei; Zou, Yuan; Sun, Fengchun; Hu, Xiaosong; Yu, Yang; Feng, Sen

    2016-10-01

    Battery characteristics vary with temperature and aging, it is necessary to identify battery parameters periodically for electric vehicles to ensure reliable State-of-Charge (SoC) estimation, battery equalization and safe operation. Aiming for on-board applications, this paper proposes a data pieces-based parameter identification (DPPI) method to identify comprehensive battery parameters including capacity, OCV (open circuit voltage)-Ah relationship and impedance-Ah relationship simultaneously only based on battery operation data. First a vehicle field test was conducted and battery operation data was recorded, then the DPPI method is elaborated based on vehicle test data, parameters of all 97 cells of the battery package are identified and compared. To evaluate the adaptability of the proposed DPPI method, it is used to identify battery parameters of different aging levels and different temperatures based on battery aging experiment data. Then a concept of ;OCV-Ah aging database; is proposed, based on which battery capacity can be identified even though the battery was never fully charged or discharged. Finally, to further examine the effectiveness of the identified battery parameters, they are used to perform SoC estimation for the test vehicle with adaptive extended Kalman filter (AEKF). The result shows good accuracy and reliability.

  17. ARIEL E-linac Cryogenic System: Commissioning and First Operational Experience

    NASA Astrophysics Data System (ADS)

    Koveshnikov, A.; Bylinskii, I.; Hodgson, G.; Kishi, D.; Laxdal, R.; Ma, Y.; Nagimov, R.; Yosifov, D.

    2015-12-01

    The Advanced Rare IsotopE Laboratory (ARIEL) is a major expansion of the Isotope Separator and Accelerator (ISAC) facility at TRIUMF. A key part of the ARIEL project is a 10 mA 50 MeV continuous-wave superconducting radiofrequency (SRF) electron linear accelerator (e-linac). The 1.3 GHz SRF cavities are operated at 2 K. HELIAL LL helium liquefier by Air Liquide Advanced Technologies (ALAT) with a tuneable liquid helium (LHe) production was installed and commissioned in Q4’2013 [1]. It provides 4 K liquid helium to one injector and one accelerator cryomodules that were installed and tested in 2014. The 4 K to 2 K liquid helium transition is achieved on-board of each cryomodule. The cryoplant, LHe and LN2 distributions, sub-atmospheric (S/A) system and cryomodules were successfully commissioned and integrated into the e-linac cryogenic system. Required pressure regulation for both 4 K cryoplant in the Dewar and 2 K with the S/A system was achieved under simulated load. Final integration tests confirmed overall stable performance of the cryogenic system with two cryomodules installed. The paper presents details of the cryogenic system commissioning tests as well as highlights of the initial operational experience.

  18. A Novel Technology for Localization of Parathyroid Adenoma: Ultrasound-Guided Fine Needle Aspiration Combined With Rapid Parathyroid Hormone Detection and Nano-Carbon Technology.

    PubMed

    Yan, Shouyi; Zhao, Wenxin; Wang, Bo; Zhang, Liyong

    2018-06-01

    The study aims to evaluate the clinic feasibility of rapid parathyroid hormone (PTH) detection and nano-carbon technology in preoperative diagnosis and localization of parathyroid adenoma. With the guidance of ultrasound, the operator performed the parathyroid puncture and tested the PTH value by using a PTH test kit, and then injected nano-carbon into parathyroid adenoma as a marker to observe whether the parathyroid adenoma was stained black during the final operation. Meanwhile, a part of excised specimen was made into homogenate and detected rapidly again by using the PTH test kit. The remaining was confirmed by intraoperative frozen pathological examination. The sensitivity (12/12) of preoperative diagnosis was significantly higher than that of ultrasound (6/12), magnetic resonance imaging (7/12), and MIBI (9/12). During the operation, we found that the inner part of the parathyroid adenoma was stained black, and the PTH value of the specimen homogenate confirmed as parathyroid adenoma was more than 3000 pg/mL. This novel technology, as a very positive method for localization of parathyroid adenoma, plays an important role in guaranteeing the surgical reliability of parathyroid adenoma with help of nano-carbon technology.

  19. Examples of subjective image quality enhancement in multimedia

    NASA Astrophysics Data System (ADS)

    Klíma, Miloš; Pazderák, Jiří; Fliegel, Karel

    2007-09-01

    The subjective image quality is an important issue in all multimedia imaging systems with a significant impact onto QoS (Quality of Service). For long time the image fidelity criterion was widely applied in technical systems esp. in both television and image source compression fields but the optimization of subjective perception quality and fidelity approach (such as the minimum of MSE) are very different. The paper presents an experimental testing of three different digital techniques for the subjective image quality enhancement - color saturation, edge enhancement, denoising operators and noise addition - well known from both the digital photography and video. The evaluation has been done for extensive operator parameterization and the results are summarized and discussed. It has been demonstrated that there are relevant types of image corrections improving to some extent the subjective perception of the image. The above mentioned techniques have been tested for five image tests with significantly different image characteristics (fine details, large saturated color areas, high color contrast, easy-to-remember colors etc.). The experimental results show the way to optimized use of image enhancing operators. Finally the concept of impressiveness as a new possible expression of subjective quality improvement is presented and discussed.

  20. Fluid Acquisition and Resupply Experiment (FARE-I) flight results

    NASA Astrophysics Data System (ADS)

    Dominick, Sam M.; Driscoll, Susan L.

    1993-06-01

    The Fluid Acquisition and Resupply Experiment, (FARE) is a Shuttle middeck-mounted experiment to demonstrate techniques for handling liquids in zero gravity for operations such as refueling spacecraft in orbit. The first flight took place on STS 53 launched December 2, 1992. Eight tests were performed during the mission and the experiment achieved 100 percent mission success. The second flight will be on STS 57, scheduled for launch in June 1993. The objective of FARE I was to demonstrate techniques for controlling the position of the liquid and gas within a tank during refilling and to better understand the operation of screen-type surface tension devices used to drain tanks in zero gravity. Tests were performed to demonstrate tank refilling, low gravity propellant slosh, and expulsion efficiency of the screen device. Expulsion efficiencies of 97 percent - 98 percent were demonstrated under a variety of flowrates and accelerations. Final fill levels of 60 percent to 80 percent were achieved during the vented fill tests.

  1. Utility gas turbine combustor viewing system: Volume 1, Conceptual design and initial field testing: Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Morey, W.W.

    1988-12-01

    This report summarizes the development and field testing of a combustor viewing probe (CVP) as a flame diagnostic monitor for utility gas turbine engines. The prototype system is capable of providing a visual record of combustor flame images, recording flame spectral data, analyzing image and spectral data, and diagnosing certain engine malfunctions. The system should provide useful diagnostic information to utility plant operators, and reduce maintenance costs. The field tests demonstrated the ability of the CVP to monitor combustor flame condition and to relate changes in the engine operation with variations in the flame signature. Engine light off, run upmore » to full speed, the addition of load, and the effect of water injection for NO/sub x/ control could easily be identified on the video monitor. The viewing probe was also valuable in identifying hard startups and shutdowns, as well as transient effects that can seriously harm the engine. 11 refs.« less

  2. Performance Gains of Propellant Management Devices for Liquid Hydrogen Depots

    NASA Technical Reports Server (NTRS)

    Hartwig, Jason W.; McQuillen, John B.; Chato, David J.

    2013-01-01

    This paper presents background, experimental design, and preliminary experimental results for the liquid hydrogen bubble point tests conducted at the Cryogenic Components Cell 7 facility at the NASA Glenn Research Center in Cleveland, Ohio. The purpose of the test series was to investigate the parameters that affect liquid acquisition device (LAD) performance in a liquid hydrogen (LH2) propellant tank, to mitigate risk in the final design of the LAD for the Cryogenic Propellant Storage and Transfer Technology Demonstration Mission, and to provide insight into optimal LAD operation for future LH2 depots. Preliminary test results show an increase in performance and screen retention over the low reference LH2 bubble point value for a 325 2300 screen in three separate ways, thus improving fundamental LH2 LAD performance. By using a finer mesh screen, operating at a colder liquid temperature, and pressurizing with a noncondensible pressurant gas, a significant increase in margin is achieved in bubble point pressure for LH2 screen channel LADs.

  3. Remote Diagnostic Measurements of Hall Thruster Plumes

    DTIC Science & Technology

    2009-08-14

    This paper describes measurements of Hall thruster plumes that characterize ion energy distributions and charge state fractions using remotely...charge state. Next, energy and charge state measurements are described from testing of a 200 W Hall thruster at AFIT. Measurements showed variation in...position. Finally, ExB probe charge state measurements are presented from a 6-kW laboratory Hall thruster operated at low discharge voltage levels at AFRL

  4. The Use of Wetting Agents/Fume Supressants for Minimizing the Atmospheric Emissions from Hard Chromium Electroplating Baths

    DTIC Science & Technology

    2003-08-01

    ESTCP FINAL REPORT For THE USE OF WETTING AGENTS/ FUME SUPPRESSANTS FOR MINIMIZING THE ATMOSPHERIC EMISSIONS FROM HARD CHROMIUM ...Introduction This project demonstrates that a “third” generation wetting agent / fume suppressant (WA/FS) chemical additive to hard chromium ...DOD operations fall in the same category.) Several papers, including Use of Fume Suppressants in Hard Chromium Baths - Quality Testing and Use

  5. Real-Time Onboard Global Nonlinear Aerodynamic Modeling from Flight Data

    NASA Technical Reports Server (NTRS)

    Brandon, Jay M.; Morelli, Eugene A.

    2014-01-01

    Flight test and modeling techniques were developed to accurately identify global nonlinear aerodynamic models onboard an aircraft. The techniques were developed and demonstrated during piloted flight testing of an Aermacchi MB-326M Impala jet aircraft. Advanced piloting techniques and nonlinear modeling techniques based on fuzzy logic and multivariate orthogonal function methods were implemented with efficient onboard calculations and flight operations to achieve real-time maneuver monitoring and analysis, and near-real-time global nonlinear aerodynamic modeling and prediction validation testing in flight. Results demonstrated that global nonlinear aerodynamic models for a large portion of the flight envelope were identified rapidly and accurately using piloted flight test maneuvers during a single flight, with the final identified and validated models available before the aircraft landed.

  6. Factors affecting the energy consumption of two refrigerator-freezers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kao, J.Y.; Kelley, G.E.

    Two refrigerator-freezers, one with a top-mounted freezer and one with side-by-side doors, were tested in the laboratory to determine the sensitivity of their energy consumption to various operational factors. Room temperature, room humidity, door openings, and the setting of the anti-sweat heater switch were the factors examined. The results indicated that the room temperature and door openings had a significantly greater effect on energy consumption than the other two factors. More detailed tests were then performed under different room temperature and door-opening combinations. The relationship of door openings and the equivalent test room temperature was established. Finally, the effect onmore » energy of different temperature settings was studied. Test results are presented and discussed.« less

  7. Demonstration of laser speckle system on burner liner cyclic rig

    NASA Technical Reports Server (NTRS)

    Stetson, K. A.

    1986-01-01

    A demonstration test was conducted to apply speckle photogrammetry to the measurement of strains on a sample of combustor liner material in a cyclic fatigue rig. A system for recording specklegrams was assembled and shipped to the NASA Lewis Research Center, where it was set up and operated during rig tests. Data in the form of recorded specklegrams were sent back to United Technologies Research Center for processing to extract strains. Difficulties were found in the form of warping and bowing of the sample during the tests which degraded the data. Steps were taken by NASA personnel to correct this problem and further tests were run. Final data processing indicated erratic patterns of strain on the burner liner sample.

  8. FULL SCALE TESTING TECHNOLOGY MATURATION OF A THIN FILM EVAPORATOR FOR HIGH-LEVEL LIQUID WASTE MANAGEMENT AT HANFORD - 12125

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    TEDESCHI AR; CORBETT JE; WILSON RA

    2012-01-26

    Simulant testing of a full-scale thin-film evaporator system was conducted in 2011 for technology development at the Hanford tank farms. Test results met objectives of water removal rate, effluent quality, and operational evaluation. Dilute tank waste simulant, representing a typical double-shell tank supernatant liquid layer, was concentrated from a 1.1 specific gravity to approximately 1.5 using a 4.6 m{sup 2} (50 ft{sup 2}) heated transfer area Rototherm{reg_sign} evaporator from Artisan Industries. The condensed evaporator vapor stream was collected and sampled validating efficient separation of the water. An overall decontamination factor of 1.2E+06 was achieved demonstrating excellent retention of key radioactivemore » species within the concentrated liquid stream. The evaporator system was supported by a modular steam supply, chiller, and control computer systems which would be typically implemented at the tank farms. Operation of these support systems demonstrated successful integration while identifying areas for efficiency improvement. Overall testing effort increased the maturation of this technology to support final deployment design and continued project implementation.« less

  9. Human Factors Assessment: The Passive Final Approach Spacing Tool (pFAST) Operational Evaluation

    NASA Technical Reports Server (NTRS)

    Lee, Katharine K.; Sanford, Beverly D.

    1998-01-01

    Automation to assist air traffic controllers in the current terminal and en route air traff ic environments is being developed at Ames Research Center in conjunction with the Federal Aviation Administration. This automation, known collectively as the Center-TRACON Automation System (CTAS), provides decision- making assistance to air traffic controllers through computer-generated advisories. One of the CTAS tools developed specifically to assist terminal area air traffic controllers is the Passive Final Approach Spacing Tool (pFAST). An operational evaluation of PFAST was conducted at the Dallas/Ft. Worth, Texas, Terminal Radar Approach Control (TRACON) facility. Human factors data collected during the test describe the impact of the automation upon the air traffic controller in terms of perceived workload and acceptance. Results showed that controller self-reported workload was not significantly increased or reduced by the PFAST automation; rather, controllers reported that the levels of workload remained primarily the same. Controller coordination and communication data were analyzed, and significant differences in the nature of controller coordination were found. Controller acceptance ratings indicated that PFAST was acceptable. This report describes the human factors data and results from the 1996 Operational Field Evaluation of Passive FAST.

  10. Evaluation of laminar flow control system concepts for subsonic commercial transport aircraft

    NASA Technical Reports Server (NTRS)

    1980-01-01

    A study was conducted to evaluate alternatives in the design of laminar flow control (LFC) subsonic commercial transport aircraft for operation in the 1980's period. Analyses were conducted to select mission parameters and define optimum aircraft configurational parameters for the selected mission, defined by a passenger payload of 400 and a design range of 12,038 km (6500 n mi). The baseline aircraft developed for this mission was used as a vehicle for the evaluation and development of alternative LFC system concepts. Alternatives were evaluated in the areas of aerodynamics structures, materials, LFC systems, leading-edge region cleaning and integration of auxiliary systems. Based on these evaluations, concept in each area were selected for further development and testing and ultimate incorporation in the final study aircraft. Relative to a similarly-optimized advanced technology turbulent transport, the final LFC configuration is approximately equal in direct operating cost but provides decreases of 8.2% in gross weight and 21.7% in fuel consumption.

  11. Radiation-Hardened Circuitry Using Mask-Programmable Analog Arrays. Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Britton, Jr., Charles L.; Ericson, Milton Nance; Bobrek, Miljko

    As the recent accident at Fukushima Daiichi so vividly demonstrated, telerobotic technologies capable of withstanding high radiation environments need to be readily available to enable operations, repair, and recovery under severe accident scenarios where human entry is extremely dangerous or not possible. Telerobotic technologies that enable remote operation in high dose rate environments have undergone revolutionary improvement over the past few decades. However, much of this technology cannot be employed in nuclear power environments due the radiation sensitivity of the electronics and the organic insulator materials currently in use. This is the final report of the activities involving the NEETmore » 2 project Radiation Hardened Circuitry Using Mask-Programmable Analog Arrays. We present a detailed functional block diagram of the proposed data acquisition system, the thought process leading to technical decisions, the implemented system, and the tested results from the systems. This system will be capable of monitoring at least three parameters of importance to nuclear reactor monitoring: temperature, radiation level, and pressure.« less

  12. High efficiency and simple technique for controlling mechanisms by EMG signals

    NASA Astrophysics Data System (ADS)

    Dugarte, N.; Álvarez, A.; Balacco, J.; Mercado, G.; Gonzalez, A.; Dugarte, E.; Javier, F.; Ceballos, G.; Olivares, A.

    2016-04-01

    This article reports the development of a simple and efficient system that allows control of mechanisms through electromyography (EMG) signals. The novelty about this instrument is focused on individual control of each motion vector mechanism through independent electronic circuits. Each of electronic circuit does positions a motor according to intensity of EMG signal captured. This action defines movement in one mechanical axis considered from an initial point, based on increased muscle tension. The final displacement of mechanism depends on individual’s ability to handle the levels of muscle tension at different body parts. This is the design of a robotic arm where each degree of freedom is handled with a specific microcontroller that responds to signals taken from a defined muscle. The biophysical interaction between the person and the final positioning of the robotic arm is used as feedback. Preliminary tests showed that the control operates with minimal positioning error margins. The constant use of system with the same operator showed that the person adapts and progressively improves at control technique.

  13. Development, installation, and testing services for an automatic, point type thermal sensor, fire protection system on a mining dozer. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lease, W.D.

    1976-08-01

    Lease AFEX, Inc., modified its standard design of an automatic fire protection system used in the past on logging equipment, and long-term, in-mine tested system on a Fiat-Alli's HD-41B dozer at the Lemmons and Company coal mine, Boonville, Ind. The modification of the standard AFEX system involved improving the actuation device. The AFEX system is called a point-type thermal sensor, automatic fire protection system. The in-mine test took place in late 1975, and early 1976. The system was then tested by simulating a fire on the dozer. The system operated successfully after the 4 months of in-mine endurance testing. (Colormore » illustrations reproduced in black and white.)« less

  14. Preliminary Assessment of Seals for Dust Mitigation of Mechanical Components for Lunar Surface Systems

    NASA Technical Reports Server (NTRS)

    Delgado, Irebert R.; Handschuh, Michael J.

    2010-01-01

    Component tests were conducted on spring-loaded Teflon seals to determine their performance in keeping lunar simulant out of mechanical component gearbox, motor, and bearing housings. Baseline tests were run in a dry-room without simulant for 10,000 cycles to determine wear effects of the seal against either anodized aluminum or stainless steel shafts. Repeat tests were conducted using lunar simulants JSC-1A and LHT-2M. Finally, tests were conducted with and without simulant in vacuum at ambient temperature. Preliminary results indicate minimal seal and shaft wear through 10,000 cycles, and more importantly, no simulant was observed to pass through the seal-shaft interface. Future endurance tests are planned at relevant NASA Lunar Surface System architecture shaft sizes and operating conditions.

  15. Flight set 360L003 instrumentation final test report, volume 9

    NASA Technical Reports Server (NTRS)

    1989-01-01

    Post-flight instrumentation hardware and data evaluation for 360L003 is summarized. The 360L003 motors were equipped with Developmental Flight Instrumentation (DFI), Operational Flight Instrumentation (OFI), and Ground Environmental Instrumentation (GEI). The DFI was designed to measure strain, temperature, pressure, and vibration at various locations on the motor during flight. The DFI is used to validate engineering models in a flight environment. The OFI consists of six Operational Pressure Tranducers which monitor chamber pressure during flight. These pressure transducers are used in the SRB separation cue. GEI measures the motor case, igniter flange, and nozzle temperature prior to launch.

  16. Low-lift-to-drag-ratio approach and landing studies using a CV-990 airplane

    NASA Technical Reports Server (NTRS)

    Kock, B. M.; Fulton, F. L.; Drinkwater, F. J., III

    1972-01-01

    The results are presented of a flight-test program utilizing a CV-990 airplane, flow in low-lift-to-drag-ratio (L/D) configurations, to simulate terminal area operation, approach, and landing of large unpowered vehicles. The results indicate that unpowered approaches and landings are practical with vehicles of the size and performance characteristics of the proposed shuttle vehicle. Low L/D landings provided touchdown dispersion patterns acceptable for operation on runways of reasonable length. The dispersion pattern was reduced when guidance was used during the final approach. High levels of pilot proficiency were not required for acceptable performance.

  17. International Space Station Major Constituent Analyzer On-orbit Performance

    NASA Technical Reports Server (NTRS)

    Gardner, Ben D.; Erwin, Phillip M.; Wiedemann, Rachel; Matty, Chris

    2016-01-01

    The Major Constituent Analyzer (MCA) is a mass spectrometer based system that measures the major atmospheric constituents on the International Space Station. A number of limited-life components require periodic change-out, including the ORU 02 analyzer and the ORU 08 Verification Gas Assembly. The most recent ORU 02 and ORU 08 assemblies are operating nominally. For ORU 02, the ion source filaments and ion pump lifetime continue to be key determinants of MCA performance. Additionally, testing is underway to evaluate the capacity of the MCA to analyze ammonia. Finally, plans are being made to bring the second MCA on ISS to an operational configuration.

  18. Long-term temperature effects on GaAs solar cells

    NASA Technical Reports Server (NTRS)

    Heinbockel, J. H.; Hong, K. H.

    1979-01-01

    The thermal degradation of AlGaAs solar cells resulting from a long-term operation in a space environment is investigated. The solar cell degradation effects caused by zinc and aluminum diffusion as well as deterioration by arsenic evaporation are presented. Also, the results are presented of experimental testing and measurements of various GaAs solar cell properties while the solar cell was operating in the temperature range of 27 C to 350 C. In particular, the properties of light current voltage curves, dark current voltage curves, and spectral response characteristics are given. Finally, some theoretical models for the annealing of radiation damage over various times and temperatures are included.

  19. Design and evaluation of pick-up truck mounted boom for elevation of a multiband radiometer system

    NASA Technical Reports Server (NTRS)

    Bauer, M. E. (Principal Investigator); Tsuchida, R.

    1981-01-01

    Three concepts were considered for the boom design: a one-piece boom with a trolley, a folding boom, and a telescoping boom. The telescoping boom was selected over the other two concepts because of its easy manual operation. The boom is designed to mount on the bed of a pick-up truck and elevate the radiometer system 8 meters above the ground and 4 meters away from the truck. The selection of the boom components is discussed with justification of the final choice. Results of performance tests and one season's operation of the completed boom are reported.

  20. WTP Waste Feed Qualification: Glass Fabrication Unit Operation Testing Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stone, M. E.; Newell, J. D.; Johnson, F. C.

    The waste feed qualification program is being developed to protect the Hanford Tank Waste Treatment and Immobilization Plant (WTP) design, safety basis, and technical basis by assuring waste acceptance requirements are met for each staged waste feed campaign prior to transfer from the Tank Operations Contractor to the feed receipt vessels inside the Pretreatment Facility. The Waste Feed Qualification Program Plan describes the three components of waste feed qualification: 1. Demonstrate compliance with the waste acceptance criteria 2. Determine waste processability 3. Test unit operations at laboratory scale. The glass fabrication unit operation is the final step in the processmore » demonstration portion of the waste feed qualification process. This unit operation generally consists of combining each of the waste feed streams (high-level waste (HLW) and low-activity waste (LAW)) with Glass Forming Chemicals (GFCs), fabricating glass coupons, performing chemical composition analysis before and after glass fabrication, measuring hydrogen generation rate either before or after glass former addition, measuring rheological properties before and after glass former addition, and visual observation of the resulting glass coupons. Critical aspects of this unit operation are mixing and sampling of the waste and melter feeds to ensure representative samples are obtained as well as ensuring the fabrication process for the glass coupon is adequate. Testing was performed using a range of simulants (LAW and HLW simulants), and these simulants were mixed with high and low bounding amounts of GFCs to evaluate the mixing, sampling, and glass preparation steps in shielded cells using laboratory techniques. The tests were performed with off-the-shelf equipment at the Savannah River National Laboratory (SRNL) that is similar to equipment used in the SRNL work during qualification of waste feed for the Defense Waste Processing Facility (DWPF) and other waste treatment facilities at the Savannah River Site. It is not expected that the exact equipment used during this testing will be used during the waste feed qualification testing for WTP, but functionally similar equipment will be used such that the techniques demonstrated would be applicable. For example, the mixing apparatus could use any suitable mixer capable of being remoted and achieving similar mixing speeds to those tested.« less

Top