Algorithm for evaluating the effectiveness of a high-rise development project based on current yield
NASA Astrophysics Data System (ADS)
Soboleva, Elena
2018-03-01
The article is aimed at the issues of operational evaluation of development project efficiency in high-rise construction under the current economic conditions in Russia. The author touches the following issues: problems of implementing development projects, the influence of the operational evaluation quality of high-rise construction projects on general efficiency, assessing the influence of the project's external environment on the effectiveness of project activities under crisis conditions and the quality of project management. The article proposes the algorithm and the methodological approach to the quality management of the developer project efficiency based on operational evaluation of the current yield efficiency. The methodology for calculating the current efficiency of a development project for high-rise construction has been updated.
NASA Technical Reports Server (NTRS)
Koenig, John C.; Billitti, Joseph W.; Tallon, John M.
1979-01-01
Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).
5 CFR 470.317 - Project evaluation.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Project evaluation. 470.317 Section 470... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.317 Project evaluation. (a) Compliance evaluation. OPM will review the operation of the...
5 CFR 470.317 - Project evaluation.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 5 Administrative Personnel 1 2012-01-01 2012-01-01 false Project evaluation. 470.317 Section 470... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.317 Project evaluation. (a) Compliance evaluation. OPM will review the operation of the...
NASA Astrophysics Data System (ADS)
Shi, Yu-Fang; Ma, Yi-Yi; Song, Ping-Ping
2018-03-01
System Reliability Theory is a research hotspot of management science and system engineering in recent years, and construction reliability is useful for quantitative evaluation of project management level. According to reliability theory and target system of engineering project management, the defination of construction reliability appears. Based on fuzzy mathematics theory and language operator, value space of construction reliability is divided into seven fuzzy subsets and correspondingly, seven membership function and fuzzy evaluation intervals are got with the operation of language operator, which provides the basis of corresponding method and parameter for the evaluation of construction reliability. This method is proved to be scientific and reasonable for construction condition and an useful attempt for theory and method research of engineering project system reliability.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LUECK, K.J.
2004-10-18
This report documents an engineering study conducted to evaluate alternatives for treating secondary waste in the secondary treatment train (STT) of the Hanford Site 200 Area Effluent Treatment Facility (ETF). The study evaluates ETF STT treatment alternatives and recommends preferred alternatives for meeting the projected future missions of the ETF. The preferred alternative(s) will process projected future ETF influents to produce a solid waste acceptable for final disposal on the Hanford Site. The main text of this report summarizes the ETF past and projected operations, lists the assumptions about projected operations that provide the basis for the engineering evaluation, andmore » summarizes the evaluation process. The evaluation process includes identification of available modifications to the current ETF process, screens those modifications for technical viability, evaluates the technically viable alternatives, and provides conclusions and recommendations based on that evaluation.« less
Norman, Christina; Axelsson, Runo
2007-10-01
During the past 15 years, there have been many initiatives to improve the integration between different welfare agencies. This study is describing and analysing the co-operation between agencies involved in a rehabilitation project in Sweden, and discussing such inter-agency co-operation as a strategy for provision of complex welfare services. The study is based on a process evaluation, where the co-operation between the agencies was followed and documented during the time of the project. Different kinds of data were collected through interviews, focus groups and diaries. The contents of these data were analysed in order to evaluate the process of co-operation. In addition, there was also an evaluation of the effects of the co-operation, based on official documents, statistics, etc. The evaluation shows that it was possible to co-operate across the organizational boundaries of the different agencies, but there were obstacles related to organizational and cultural differences of the agencies, divided loyalties of the officials and limited resources available to deal with the complex needs of the clients. At the same time, the commitment and the relations between the officials were facilitating the co-operation. Based on the evaluation of this project, it seems that co-operation could be an effective strategy to deal with clients who need services from different welfare agencies. At the same time, however, it is clear that inter-agency co-operation requires a lot of time and energy and should therefore be used with caution.
Review of operations in the Virginia Department of Transportation's project development process.
DOT National Transportation Integrated Search
2007-01-01
The Virginia Department of Transportation's (VDOT's) project development process (PDP) directs how construction projects are developed. The purpose of this study was to evaluate the manner in which operations is currently considered throughout the PD...
ERIC Educational Resources Information Center
World Bank, Washington, DC.
The World Bank's Operation Evaluation Department (OED) evaluates educational development in Thailand and assesses the cumulative impact of the Bank's projects on development in that country. From 1966 to date, the Bank supported six education projects with an estimated cost of a half billion dollars. The report covers: (1) economic and educational…
ERIC Educational Resources Information Center
Palomba, Neil A.; And Others
This study was conducted to: (1) evaluate the Occupational Upgrading Project (OUP) and the Model Neighborhood High School Equivalency (HSE) Project's first year of operation, and (2) create baseline data from which future and more conclusive evaluation can be undertaken. Data were gathered by conducting open-ended interviews with the…
Volden, Gro Holst
2018-08-01
Infrastructure projects in developed countries are rarely evaluated ex-post. Despite their number and scope, our knowledge about their various impacts is surprisingly limited. The paper argues that such projects must be assessed in a broad perspective that includes both operational, tactical and strategic aspects, and unintended as well as intended effects. A generic six-criteria evaluation framework is suggested, inspired by a framework frequently used to evaluate development assistance projects. It is tested on 20 Norwegian projects from various sectors (transport, defence, ICT, buildings). The results indicate that the majority of projects were successful, especially in operational terms, possibly because they underwent external quality assurance up-front. It is argued that applying this type of standardized framework provides a good basis for comparison and learning across sectors. It is suggested that evaluations should be conducted with the aim of promoting accountability, building knowledge about infrastructure projects, and continuously improve the tools, methods and governance arrangements used in the front-end of project development. Copyright © 2018 The Author. Published by Elsevier Ltd.. All rights reserved.
Code of Federal Regulations, 2010 CFR
2010-01-01
... period for which project or measure benefits and costs have been evaluated. The evaluated life starts after the last project measure of the evaluation unit has been completed. Landuser. Those who... purpose and the replacement of portions of project measures as specified in the O&M agreement. Operation...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kerlin, B.D.; Cerva, J.R.; Glenn, M.E.
This document describes evaluation studies and technical investigations proposed for the three-year Digital Imaging Network System (DINS) prototype project, sponsored by the U.S. Army Medical Research and Development Command, Ft. Detrick, Maryland. The project has three overall goals. The first is to install and operate a prototype DINS at each of two University-based hospitals for test purposes. The second is to evaluate key aspects of each prototype system once it is in full operation. The third is to develop guidelines and specifications for an operational DINS suitable for use by the military and others developing systems of the future. Thismore » document defines twelve overall evaluative questions for use in meeting the second and third objectives of the project and proposes studies that will answer these questions.« less
Project Change Evaluation Research Brief.
ERIC Educational Resources Information Center
Leiderman, Sally A.; Dupree, David M.
Project Change is a community-driven anti-racism initiative operating in four communities: Albuquerque, New Mexico; El Paso, Texas; Knoxville, Tennessee; and Valdosta, Georgia. The formative evaluation of Project Change began in 1994 when all of the sites were still in planning or early action phases. Findings from the summative evaluation will be…
School Safety Project: Product Evaluation, 1990-1991.
ERIC Educational Resources Information Center
Saginaw Public Schools, MI. Dept. of Evaluation Services.
A districtwide school safety project implemented in Saginaw, Michigan, in 1990-91, the third year of its operation, is evaluated in this report. The project is evaluated on the basis of the following objectives: employment and training of home-school liaison officers; establishment of an advisory council; development and implementation of…
NASA Technical Reports Server (NTRS)
Mayo, L. H.
1975-01-01
An anticipatory project assessment is discussed which is characterized as the capacity to perform, and the disposition to take into account in relevant decisional areas, the following operations: identification of the significant effects which will result from the introduction of a specified project configuration into alternative projected future social environments during the planning, implementation, and operational states; evaluation of such effects in terms of social impacts on affected participants and social value-institutional processes in accord with specified concepts of social justice.
ERIC Educational Resources Information Center
Jacobs, James N., Ed.; Felix, Joseph L., Ed.
1966-01-01
This evaluation of Cincinnati's Title I projects for the disadvantaged public school students notes that definitive statements about measurable results are unrealistic because the projects were evaluated after only 5 months in operation. However the evaluation establishes baseline data. Information about the 13 Title I projects was gathered from…
ERIC Educational Resources Information Center
Greene, Judy
Students Upgrading through Computer and Career Education System Services (Project SUCCESS) was an Elementary and Secondary Education Act Title VII-funded project in its fourth year of operation. The project operated at two high schools in Brooklyn and one in Manhattan (New York). In the 1993-94 school year, the project served 393 students of…
Kentucky Migrant Technology Project: External Evaluation Report, 1997-98.
ERIC Educational Resources Information Center
Popp, Robert J.
During its first year of operation (1997-98), the Kentucky Migrant Technology Project successfully implemented its model, used internal and external evaluations to inform improvement of the model, and began plans for expansion into new service areas. This evaluation report is organized around five questions that focus on the project model and its…
Kinetic Rate Kernels via Hierarchical Liouville-Space Projection Operator Approach.
Zhang, Hou-Dao; Yan, YiJing
2016-05-19
Kinetic rate kernels in general multisite systems are formulated on the basis of a nonperturbative quantum dissipation theory, the hierarchical equations of motion (HEOM) formalism, together with the Nakajima-Zwanzig projection operator technique. The present approach exploits the HEOM-space linear algebra. The quantum non-Markovian site-to-site transfer rate can be faithfully evaluated via projected HEOM dynamics. The developed method is exact, as evident by the comparison to the direct HEOM evaluation results on the population evolution.
Evaluation of the Rural Math Excel Partnership Project Final Report
ERIC Educational Resources Information Center
Nagle, Katherine; Pratt-Williams, Jaunelle; Schmidt, Rebecca; Swantek, Cara; Lyulchenko, Marianna; McGhee, Raymond
2016-01-01
This is the final external evaluation report prepared by SRI International for the Rural Math Excel Partnership (RMEP) project, an investing in innovation (i3) development project funded by the U.S. Department of Education. Operated by Virginia Advanced Study Strategies, Inc. (VASS), the RMEP project included six rural school districts (LEAs) in…
ERIC Educational Resources Information Center
Arter, Rhetta M.
The Parent Leadership Training Project (PLTP) through Adult Basic Education was established as a two-year demonstration project designed to increase the reading skills of adults (16 and over) through a language-experience approach, using topics selected by the participants. The independent project evaluation covers the entire operational period…
Outside Evaluation Report for the Arlington Federal Workplace Literacy Project.
ERIC Educational Resources Information Center
Wrigley, Heide Spruck
The successes and challenges of the Arlington Education and Employment Program (REEP) Workplace Literacy Project in Virginia are described in this evaluation report. REEP's federal Workplace Literacy Project Consortium is operated as a special project within the Department of Adult, Career and Vocational Education of the Arlington Public Schools.…
ANNUAL EVALUATION REPORT OF CONNECTICUT TITLE I PROJECTS FOR FISCAL YEAR 1966.
ERIC Educational Resources Information Center
ROBY, WALLACE
THIS EVALUATION BY THE CONNECTICUT DEPARTMENT OF EDUCATION OF THE ELEMENTARY AND SECONDARY EDUCATION ACT TITLE I PROJECTS CAUTIONS ABOUT MAKING GENERALIZATIONS ABOUT THE EFFECTIVENESS OF PROJECTS WHICH HAVE BEEN IN OPERATION FOR ONLY A BRIEF PERIOD. THE REPORT NOTES, HOWEVER, THAT SUCH AN EVALUATION CAN BE USEFUL IN ESTABLISHING BASELINE DATA AND…
Learning Investment for Tomorrow: ESEA Title I Project 69-092, Evaluation Report, 1968-1969.
ERIC Educational Resources Information Center
Colorado Springs Public Schools, CO. Div. of Special Services.
This evaluation report carries a description of each project then in operation, an analysis of the evaluative data collected for each, and recommendations for improvement. Objectives of the projects, geared for disadvantaged youth (K-12), were: improvement of performance of capabilities of children with learning disabilities due to psychological,…
NASA Technical Reports Server (NTRS)
Remer, D. S.
1977-01-01
A mathematical model is developed for calculating the life cycle costs for a project where the operating costs increase or decrease in a linear manner with time. The life cycle cost is shown to be a function of the investment costs, initial operating costs, operating cost gradient, project life time, interest rate for capital and salvage value. The results show that the life cycle cost for a project can be grossly underestimated (or overestimated) if the operating costs increase (or decrease) uniformly over time rather than being constant as is often assumed in project economic evaluations. The following range of variables is examined: (1) project life from 2 to 30 years; (2) interest rate from 0 to 15 percent per year; and (3) operating cost gradient from 5 to 90 percent of the initial operating costs. A numerical example plus tables and graphs is given to help calculate project life cycle costs over a wide range of variables.
Effective Transition (Project E.T.) Final Evaluation Report, 1992-93. OER Report.
ERIC Educational Resources Information Center
Musante, Patricia
This report presents an evaluation of the Effective Transition (ET) project, an Elementary and Secondary Education Act Title VII-funded project in its second year of operation at Lafayette High School and Pershing Intermediate School in Brooklyn, New York. The project served a total of 300 students of limited English proficiency who were native…
ERIC Educational Resources Information Center
Martinez, John; Fraker, Thomas; Manno, Michelle; Baird, Peter; Mamun, Arif; O'Day, Bonnie; Rangarajan, Anu; Wittenburg, David
2010-01-01
This report focuses on the seven original Youth Transition Demonstration (YTD) projects selected for funding in 2003. Three of the original seven projects were selected for a national random assignment evaluation in 2005; however, this report only focuses on program operations prior to joining the random assignment evaluation for the three…
ERIC Educational Resources Information Center
Fairfax County Schools, Baileys Crossroads, VA. Center for Effecting Educational Change.
This report is an assessment of the overall impact and influence on education of 137 terminated Planning and Operational Grants made under the ESEA Title III Projects to Advance Creativity in Education (PACE) program. Analysis and evaluation seek to determine whether (1) individual project objectives were identified and achieved, (2) PACE…
Stakeholder approach for evaluating organizational change projects.
Peltokorpi, Antti; Alho, Antti; Kujala, Jaakko; Aitamurto, Johanna; Parvinen, Petri
2008-01-01
This paper aims to create a model for evaluating organizational change initiatives from a stakeholder resistance viewpoint. The paper presents a model to evaluate change projects and their expected benefits. Factors affecting the challenge to implement change were defined based on stakeholder theory literature. The authors test the model's practical validity for screening change initiatives to improve operating room productivity. Change initiatives can be evaluated using six factors: the effect of the planned intervention on stakeholders' actions and position; stakeholders' capability to influence the project's implementation; motivation to participate; capability to change; change complexity; and management capability. The presented model's generalizability should be explored by filtering presented factors through a larger number of historical cases operating in different healthcare contexts. The link between stakeholders, the change challenge and the outcomes of change projects needs to be empirically tested. The proposed model can be used to prioritize change projects, manage stakeholder resistance and establish a better organizational and professional competence for managing healthcare organization change projects. New insights into existing stakeholder-related understanding of change project successes are provided.
Bio-Response Operational Testing and Evaluation (BOTE) ...
Report and technical brief and informational video The Bio-response Operational Testing and Evaluation (BOTE) Project was a multi-agency effort designed to operationally test and evaluate, at the scale of a moderately sized building, a response to a B. anthracis spore release from initial public health and law enforcement investigation through environmental remediation.
ERIC Educational Resources Information Center
Schermerhorn, Leora L., Ed.; And Others
Descriptive and evaluative information is provided in this report on Project COMPAS (Consortium for Operating and Managing Programs for the Advancement of Skills), a cooperative effort between seven community colleges which developed cognitive skills programs for entry-level freshmen. Chapter I reviews the unique features of Project COMPAS,…
NASA Technical Reports Server (NTRS)
Madura, John T.; Bauman, William H.; Merceret, Francis J.; Roeder, William P.; Brody, Frank C.; Hagemeyer, Bartlett C.
2010-01-01
The Applied Meteorology Unit (AMU) provides technology transition and technique development to improve operational weather support to the Space Shuttle and the entire American space program. The AMU is funded and managed by NASA and operated by a contractor that provides five meteorologists with a diverse mix of advanced degrees, operational experience, and associated skills including data processing, statistics, and the development of graphical user interfaces. The AMU's primary customers are the U.S. Air Force 45th Weather Squadron at Patrick Air Force Base, the National Weather Service Spaceflight Meteorology Group at NASA Johnson Space Center, and the National Weather Service Melbourne FL Forecast Office. The AMU has transitioned research into operations for nineteen years and worked on a wide range of topics, including new forecasting techniques for lightning probability, synoptic peak winds,.convective winds, and summer severe weather; satellite tools to predict anvil cloud trajectories and evaluate camera line of sight for Space Shuttle launch; optimized radar scan strategies; evaluated and implemented local numerical models; evaluated weather sensors; and many more. The AMU has completed 113 projects with 5 more scheduled to be completed by the end of 2010. During this rich history, the AMU and its customers have learned many lessons on how to effectively transition research into operations. Some of these lessons learned include collocating with the operational customer and periodically visiting geographically separated customers, operator submitted projects, consensus tasking process, use of operator primary advocates for each project, customer AMU liaisons with experience in both operations and research, flexibility in adapting the project plan based on lessons learned during the project, and incorporating training and other transition assistance into the project plans. Operator involvement has been critical to the AMU's remarkable success and many awards from NASA, the National Weather Association, and two citations from the Navy's Center of Excellence for Best Manufacturing Practices. This paper will present the AMU's proven methods and explain how they may be applied by other organizations to effectively transition research into operations.
ERIC Educational Resources Information Center
Musante, Patricia
This report presents an evaluation of Bilingual Enrichment Services and Training (Project BEST), an Elementary and Secondary Education Act Title VII-funded project in its third year of operation at four schools in Manhattan. The project served 266 Cantonese-, Fukienese, and Mandarin-speaking gifted students of limited English proficiency.…
ERIC Educational Resources Information Center
Keister, Mary Elizabeth
This document is the final report of Phase One (1967-1970) of the Group Care of Infants Demonstration (Center) Project. This report devotes major attention to the problems of establishing, operating, and evaluating a group day care center for infant and toddler care. The Center project describes what is required to provide housing, equipment,…
This report documents the activities performed and the results obtained for the arsenic removal treatment technology demonstration project following one year of operation at the Climax, Minnesota, site. The objectives of the project were to evaluate: (1) the effectiveness of Kin...
Genesis field operational test : final evaluation report
DOT National Transportation Integrated Search
1997-09-01
This document is the Final Evaluation Report for the Genesis Advanced Traveler Information System (ATIS) Field Operational Test (FOT). Genesis was one of the early projects sponsored by the US Department of Transportation (USDOT) Intelligent Transpor...
Evaluation of Title I ESEA Projects, 1976-77: Technical Reports. Report #77140.
ERIC Educational Resources Information Center
Philadelphia School District, PA. Office of Research and Evaluation.
This volume compiles technical reports of Title I Elementary and Secondary Education Act project evaluations conducted during the 1976-77 academic year in the school district of Philadelphia, Pennsylvania. The reports include rationale, expected outcomes, mode of operation, previous evaluative findings, current implementation, and attainment of…
Oregon Green Light CVO evaluation : final report : executive summary
DOT National Transportation Integrated Search
2001-04-01
This report summarizes the findings of all of the Detailed Test Plans conducted for the evaluation of the Oregon Green Light Commercial Vehicle Operations (CVO) project. This project was responsible for the installation of 21 systems containing weigh...
ERIC Educational Resources Information Center
Clarke, Candice
This report presents an evaluation of the Bilingual Academic and Career Education Services for Hispanic High School Students (Project BACES), an Elementary and Secondary Education Act Title VII-funded project in its third year of operation at DeWitt Clinton High School in the Bronx and George Washington High School in Manhattan. The project served…
A Multistage R & D Project Selection Model with Multiple Objectives.
1979-01-01
Hart, "A Chart for Evaluating Product Research and Develop- ment Projects," Operations Research Quarterly, Vol. 17 (December, 1966), pp. 347 -358. R...ff -a t -V v -t #i CNICICSI NN N OCOC2 00 14:5 C U,’ 168 ~O N w- ED ucO 04" 04 c . 1f.4; v LI . H 4 m.-) HML 0 0 m n bw3 NOWO 0- . -Jr.J 44 V...34 Operations Research Quarterly, Vol. 17 (December, 1966), pp. 347 -358. _ "Evaluation of Research and Development Projects," Chemistry and Industry (March
Alcohol safety action projects evaluation of operations : data, table of results, and formulation
DOT National Transportation Integrated Search
1979-06-01
This volume contains the data used in the evaluation of 35 Alcohol Safety Action Projects implemented throughout the country. Historical background, discussion of analytic results and factors affecting impact detecion are contained in the document ti...
Katy Freeway : an evaluation of a second-generation managed lanes project.
DOT National Transportation Integrated Search
2013-04-01
The Katy Freeway Managed Lanes (KML) represents the first operational, multilane managed facility in : Texas and provides an opportunity to benefit from the lessons learned from the project. This study evaluated : multiple aspects of KML and the crit...
Increased D.U.I. enforcement program : Stockton, California project evaluation
DOT National Transportation Integrated Search
1977-01-01
This report concerns the evaluation of the first six-month operational phase of the Increased D.U.I. Enforcement Demonstration Project in Stockton, California. The D.U.I. Enforcement Program involves the use of varying levels of personnel specificall...
ERIC Educational Resources Information Center
New York City Board of Education, Brooklyn, NY. Office of Research, Evaluation, and Assessment.
An evaluation was done of New York City Public Schools' Chinese Opportunities in Career Education Program (Project CHOICE), which served economically disadvantaged Chinese American high school students of limited English proficiency. The project operated at two Manhattan high schools and served 523 students, of whom 94.6 percent were eligible for…
ERIC Educational Resources Information Center
Guadalupe, Deana R.
This report presents an evaluation of the Cognitive Academic Learning Approaches through ESL Content Area Instruction with Career Exploration Strategies (Project CALA)), an Elementary and Secondary Education Act Title VII-funded project in its fifth and last year of operation at International High School, a bilingual special alternative high…
ERIC Educational Resources Information Center
Choonoo, John
This report presents an evaluation of the Bilingual Readiness for Achieving through Valued Opportunities (Project BRAVO), an Elementary and Secondary Education Act Title VII-funded project in its first year of operation at Boys and Girls High School in Brooklyn (New York) and Louis D. Brandeis High School in Manhattan (New York). Participating…
ERIC Educational Resources Information Center
New York City Board of Education, Brooklyn, NY. Office of Research, Evaluation, and Assessment.
An evaluation was done of the New York City Public Schools' Student Upgrading through Computer and Career Education Systems Services Program (Project SUCCESS). Project SUCCESS operated at 3 high schools in Brooklyn and Manhattan (Murry Bergtraum High School, Edward R. Murrow High School, and John Dewey High School). It enrolled limited English…
Study on the Selection of Equipment Suppliers for Wind Power Generation EPC Project
NASA Astrophysics Data System (ADS)
Yang, Yuanyue; Li, Huimin
2017-12-01
In the EPC project, the purchase cost of equipments accounted for about 60% of the total project cost, thus, the selection of equipment suppliers has an important influence on the EPC project. This paper, took EPC project for the phase I engineering of Guizhou Huaxi Yunding wind power plant as research background, constructed the evaluation index system for the selection of equipment suppliers for wind power generation EPC project from multiple perspectives, and introduced matter-element extension evaluation model to evaluate the selection of equipment suppliers for this project from the qualitative and quantitative point of view. The result is consistent with the actual situation, which verifies the validity and operability of this method.
Flight Projects Office Information Systems Testbed (FIST)
NASA Technical Reports Server (NTRS)
Liggett, Patricia
1991-01-01
Viewgraphs on the Flight Projects Office Information Systems Testbed (FIST) are presented. The goal is to perform technology evaluation and prototyping of information systems to support SFOC and JPL flight projects in order to reduce risk in the development of operational data systems for such projects.
ERIC Educational Resources Information Center
Bailis, Lawrence N.; And Others
An interim evaluation analyzed the first year of operation of the Job Training for the Homeless Demonstration Program (JTHDP). Data were collected from quarterly progress reports and evaluation reports submitted by 32 local JTHDP projects. The projects exceeded planned levels of clients served and achieved other positive outcomes, including…
34 CFR 644.21 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2010 CFR
2010-07-01
... period and the project period given the project budget and other resources. (c) Plan of operation (30 points). The Secretary evaluates the quality of the applicant's plan of operation on the basis of the... their participation without regard to race, color, national origin, gender, or disability; (3) (2 points...
Methodology for urban rail and construction technology research and development planning
NASA Technical Reports Server (NTRS)
Rubenstein, L. D.; Land, J. E.; Deshpande, G.; Dayman, B.; Warren, E. H.
1980-01-01
A series of transit system visits, organized by the American Public Transit Association (APTA), was conducted in which the system operators identified the most pressing development needs. These varied by property and were reformulated into a series of potential projects. To assist in the evaluation, a data base useful for estimating the present capital and operating costs of various transit system elements was generated from published data. An evaluation model was developed which considered the rate of deployment of the research and development project, potential benefits, development time and cost. An outline of an evaluation methodology that considered benefits other than capital and operating cost savings was also presented. During the course of the study, five candidate projects were selected for detailed investigation; (1) air comfort systems; (2) solid state auxiliary power conditioners; (3) door systems; (4) escalators; and (5) fare collection systems. Application of the evaluation model to these five examples showed the usefulness of modeling deployment rates and indicated a need to increase the scope of the model to quantitatively consider reliability impacts.
NASA Astrophysics Data System (ADS)
Vasiliades, Lampros; Spiliotopoulos, Marios; Tzabiras, John; Loukas, Athanasios; Mylopoulos, Nikitas
2015-06-01
An integrated modeling system, developed in the framework of "Hydromentor" research project, is applied to evaluate crop water requirements for operational water resources management at Lake Karla watershed, Greece. The framework includes coupled components for operation of hydrotechnical projects (reservoir operation and irrigation works) and estimation of agricultural water demands at several spatial scales using remote sensing. The study area was sub-divided into irrigation zones based on land use maps derived from Landsat 5 TM images for the year 2007. Satellite-based energy balance for mapping evapotranspiration with internalized calibration (METRIC) was used to derive actual evapotranspiration (ET) and crop coefficient (ETrF) values from Landsat TM imagery. Agricultural water needs were estimated using the FAO method for each zone and each control node of the system for a number of water resources management strategies. Two operational strategies of hydro-technical project development (present situation without operation of the reservoir and future situation with the operation of the reservoir) are coupled with three water demand strategies. In total, eight (8) water management strategies are evaluated and compared. The results show that, under the existing operational water resources management strategies, the crop water requirements are quite large. However, the operation of the proposed hydro-technical projects in Lake Karla watershed coupled with water demand management measures, like improvement of existing water distribution systems, change of irrigation methods, and changes of crop cultivation could alleviate the problem and lead to sustainable and ecological use of water resources in the study area.
ERIC Educational Resources Information Center
Koralek, Robin; Johnson, Heidi; Ratcliffe, Caroline; Vericker, Tracy
2010-01-01
This report presents the final results for the evaluation of the New Americans Centers (NACs) demonstration project in Arkansas and Iowa. It focuses on program operations and plans for program sustainability, while highlighting services provided through the demonstration projects in Arkansas and Iowa. It also documents outcomes for New Iowan…
DOT National Transportation Integrated Search
1999-01-01
In 1997, the Ann Arbor (Michigan) Transportation Authority began deploying advanced public transportation systems (APTS) technologies in its fixed route and paratransit operations. The project's concept is the integration of a range of such technolog...
7 CFR 4280.42 - Application evaluation and selection.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Project plans, its management, and, if applicable, its products and operating plans. (The business plan...) Nature of the Project. Rural Development will award up to 60 points based on whether the Project: (i) Is... connection project (such as streets or utilities)—20 points; (ii) Provides Technical Assistance to rural...
Performance evaluation approach for the supercritical helium cold circulators of ITER
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vaghela, H.; Sarkar, B.; Bhattacharya, R.
2014-01-29
The ITER project design foresees Supercritical Helium (SHe) forced flow cooling for the main cryogenic components, namely, the superconducting (SC) magnets and cryopumps (CP). Therefore, cold circulators have been selected to provide the required SHe mass flow rate to cope with specific operating conditions and technical requirements. Considering the availability impacts of such machines, it has been decided to perform evaluation tests of the cold circulators at operating conditions prior to the series production in order to minimize the project technical risks. A proposal has been conceptualized, evaluated and simulated to perform representative tests of the full scale SHe coldmore » circulators. The objectives of the performance tests include the validation of normal operating condition, transient and off-design operating modes as well as the efficiency measurement. A suitable process and instrumentation diagram of the test valve box (TVB) has been developed to implement the tests at the required thermodynamic conditions. The conceptual engineering design of the TVB has been developed along with the required thermal analysis for the normal operating conditions to support the performance evaluation of the SHe cold circulator.« less
Morandi, Bertrand; Piégay, Hervé; Lamouroux, Nicolas; Vaudor, Lise
2014-05-01
Since the 1990s, French operational managers and scientists have been involved in the environmental restoration of rivers. The European Water Framework Directive (2000) highlights the need for feedback from restoration projects and for evidence-based evaluation of success. Based on 44 French pilot projects that included such an evaluation, the present study includes: 1) an introduction to restoration projects based on their general characteristics 2) a description of evaluation strategies and authorities in charge of their implementation, and 3) a focus on the evaluation of results and the links between these results and evaluation strategies. The results show that: 1) the quality of an evaluation strategy often remains too poor to understand well the link between a restoration project and ecological changes; 2) in many cases, the conclusions drawn are contradictory, making it difficult to determine the success or failure of a restoration project; and 3) the projects with the poorest evaluation strategies generally have the most positive conclusions about the effects of restoration. Recommendations are that evaluation strategies should be designed early in the project planning process and be based on clearly-defined objectives. Copyright © 2014 Elsevier Ltd. All rights reserved.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-25
... in Kansas City, Missouri. Through the project, GSA proposes to relocate its current operations from... downtown East Village development and tax increment financing (TIF) district, on the East-side of downtown... result of the construction and operation of the proposed project. GSA also evaluates a ``No Action'' and...
NASA Technical Reports Server (NTRS)
Silbert, Mendel N.
1967-01-01
The purpose of this paper is to present results of a system analysis and operational evaluation of a captive airfoil balloon system. The system was used operationally in support of an Aeropalynologic Survey Project at NASA Wallops Island, Virginia, during the summer of 1966.
ERIC Educational Resources Information Center
GROSSER, CHARLES
BASED ON A REVIEW OF REPORTS AND OTHER DOCUMENTS PREPARED BY VARIOUS MANPOWER DEVELOPMENT TRAINING ACT-SPONSORED YOUTH-TRAINING PROJECTS AND ON INTERVIEWS WITH ADMINISTRATORS AND COMMUNITY RESIDENTS AT FIVE PROJECT SITES, THIS STUDY EVALUATES THE USE OF NONPROFESSIONAL STAFF IN THE OPERATION OF MANPOWER PROGRAMS. THE CONSEQUENCES OF SUCH…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bronson, James P.; Duke, Bill; Loffink, Ken
2008-12-30
In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. Migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival ofmore » migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage and trapping facility design, operation, and criteria. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. Beginning in March of 2007, two work elements from the Walla Walla Fish Passage Operations Project were transferred to other projects. The work element Enumeration of Adult Migration at Nursery Bridge Dam is now conducted under the Walla Walla Basin Natural Production Monitoring and Evaluation Project and the work element Provide Transportation Assistance is conducted under the Umatilla Satellite Facilities Operation and Maintenance Project. Details of these activities can be found in those project's respective annual reports.« less
Guidelines for signal operations at intersections with wide medians.
DOT National Transportation Integrated Search
2010-03-01
The objective of this project is to evaluate the operations at signalized intersections with wide medians in : order to improve safety and efficiency. Intersections with wide medians are characterized by two : intersections and operate differently co...
Lonati, Giovanni; Cernuschi, Stefano; Sidi, Shelina
2010-12-01
This work is intended to assess the impact on local air quality due to atmospheric emissions from port area activities for a new port in project in the Mediterranean Sea. The sources of air pollutants in the harbour area are auxiliary engines used by ships at berth during loading/offloading operations. A fleet activity-based methodology is first applied to evaluate annual pollutant emissions (NO(X), SO(X), PM, CO and VOC) based on vessel traffic data, ships tonnage and in-port hotelling time for loading/offloading operations. The 3-dimensional Calpuff transport and dispersion model is then applied for the subsequent assessment of the ground level spatial distribution of atmospheric pollutants for both long-term and short-term averaging times. Compliance with current air quality standards in the port area is finally evaluated and indications for port operation are provided. Some methodological aspects of the impact assessment procedure, namely those concerning the steps of emission scenario definitions and model simulations set-up at the project stage, are specifically addressed, suggesting a pragmatic approach for similar evaluations for small new ports in project. Copyright © 2010 Elsevier B.V. All rights reserved.
DOT National Transportation Integrated Search
2010-12-01
This project mainly focuses on exit ramp performance analysis of safety and operations. In addition, issues of advance guide sign for exit ramp are also mentioned. : Safety analysis evaluates safety performances of different exit ramps used in Florid...
2018-01-01
Restoration Options – Comparison of Dredging and Aeration – and Broad Application to USACE Projects En vi ro nm en ta l L ab or at or y Victor F. Medina... Projects Victor F. Medina, Kaytee Pokrzywinski, and Edith Martinez-Guerra Environmental Laboratory U.S. Army Engineer Research and Development...Operations Technical Support Program 3909 Halls Ferry Road Vicksburg, MS 39180 Under Project No. TA2017-002, “Evaluation of Koontz Lake (Indiana
ERIC Educational Resources Information Center
Rippey, Robert M.
This document recounts the efforts of an urban college of education (the one at the University of Illinois/Chicago Circle) to develop a cooperative program in urban teacher education. It deals with the origin of the project, operational problems encountered, solutions attempted, critical functions of systematic evaluation. Also included are…
Development and Evaluation of Control System for Microgrid Supplying Heat and Electricity
NASA Astrophysics Data System (ADS)
Kojima, Yasuhiro; Koshio, Masanobu; Nakamura, Shizuka
Photovoltaic (PV) and Wind Turbine (WT) generation systems are expected to offer solutions to reduce green house gases and become more widely used in the future. However, the chief technical drawback of using these kinds of weather-dependent generators is the difficulty of forecasting their output, which can have negative impacts on commercial grids if a large number of them are introduced. Thus, this problem may hinder the wider application of PV and WT generation systems. The Regional Power Grid with Renewable Energy Resources Project was launched to seek a solution to this problem. The scope of the project is to develop, operate, and evaluate a Dispersed Renewable Energy Supply System with the ability to adapt the total energy output in response to changes in weather and demand. Such a system would reduce the impact that PV and WT generation systems have on commercial grids and allow the interconnection of more Dispersed Energy Resources (DER). In other words, the main objective of this project is to demonstrate an integrated energy management system, or a type of microgrid [1], as a new way of introducing DERs. The system has been in operation since October 2005 and will continue operation until March 2008. Through the project period, the data on power quality, system efficiency, operation cost, and environmental burden will be gathered and a cost-benefit analysis of the system will be undertaken. In this paper, firstly we introduce the concept of microgrid for reducing negative impact of natural energy, and secondly illustrate the structure of electric and thermal supply control system for Microgrid, especially for the Hachinohe demonstration project. The control system consists of four stages; weekly operation planning, economic dispatching control, tie-line control and local frequency control. And finally demonstration results and evaluation results are shown.
NASA Technical Reports Server (NTRS)
Statler, Irving C. (Editor)
2007-01-01
The Aviation System Monitoring and Modeling (ASMM) Project was one of the projects within NASA s Aviation Safety Program from 1999 through 2005. The objective of the ASMM Project was to develop the technologies to enable the aviation industry to undertake a proactive approach to the management of its system-wide safety risks. The ASMM Project entailed four interdependent elements: (1) Data Analysis Tools Development - develop tools to convert numerical and textual data into information; (2) Intramural Monitoring - test and evaluate the data analysis tools in operational environments; (3) Extramural Monitoring - gain insight into the aviation system performance by surveying its front-line operators; and (4) Modeling and Simulations - provide reliable predictions of the system-wide hazards, their causal factors, and their operational risks that may result from the introduction of new technologies, new procedures, or new operational concepts. This report is a documentation of the history of this highly successful project and of its many accomplishments and contributions to improved safety of the aviation system.
James Monroe High School Proyecto Nuevos Horizontes, 1985-1986. OEA Evaluation Report.
ERIC Educational Resources Information Center
New York City Board of Education, Brooklyn. Office of Educational Assessment.
Proyecto Nuevos Horizontes, a 3-year Title VII-funded bilingual education program, serves 287 Spanish speaking students at James Monroe High School (Bronx, New York). This report evaluates the project's first year of operation, 1985-86. The report contains an introduction describing the school and project goals; information on student…
DOT National Transportation Integrated Search
2001-09-01
This project evaluated the safety and operational impacts of two alternative left-turn treatments from driveways/side streets. The two treatments were: (1) Direct left turns (DLT) and, (2) Right turns followed by U-turns (RTUT). Ten sites were select...
DOT National Transportation Integrated Search
2002-03-29
In 1998, the United States experienced nearly 400,000 crashes involving large trucks, resulting in approximately 5,000 deaths. Although new research (e.g., the Large Truck Crash Causation Project) is being planned by the Federal Motor Carrier Safety ...
Human Centered Autonomous and Assistant Systems Testbed for Exploration Operations
NASA Technical Reports Server (NTRS)
Malin, Jane T.; Mount, Frances; Carreon, Patricia; Torney, Susan E.
2001-01-01
The Engineering and Mission Operations Directorates at NASA Johnson Space Center are combining laboratories and expertise to establish the Human Centered Autonomous and Assistant Systems Testbed for Exploration Operations. This is a testbed for human centered design, development and evaluation of intelligent autonomous and assistant systems that will be needed for human exploration and development of space. This project will improve human-centered analysis, design and evaluation methods for developing intelligent software. This software will support human-machine cognitive and collaborative activities in future interplanetary work environments where distributed computer and human agents cooperate. We are developing and evaluating prototype intelligent systems for distributed multi-agent mixed-initiative operations. The primary target domain is control of life support systems in a planetary base. Technical approaches will be evaluated for use during extended manned tests in the target domain, the Bioregenerative Advanced Life Support Systems Test Complex (BIO-Plex). A spinoff target domain is the International Space Station (ISS) Mission Control Center (MCC). Prodl}cts of this project include human-centered intelligent software technology, innovative human interface designs, and human-centered software development processes, methods and products. The testbed uses adjustable autonomy software and life support systems simulation models from the Adjustable Autonomy Testbed, to represent operations on the remote planet. Ground operations prototypes and concepts will be evaluated in the Exploration Planning and Operations Center (ExPOC) and Jupiter Facility.
Operation of the Computer Software Management and Information Center (COSMIC)
NASA Technical Reports Server (NTRS)
1983-01-01
The major operational areas of the COSMIC center are described. Quantitative data on the software submittals, program verification, and evaluation are presented. The dissemination activities are summarized. Customer services and marketing activities of the center for the calendar year are described. Those activities devoted to the maintenance and support of selected programs are described. A Customer Information system, the COSMIC Abstract Recording System Project, and the COSMIC Microfiche Project are summarized. Operational cost data are summarized.
DOT National Transportation Integrated Search
1974-01-01
This report is one of a series developed in conformance with annual reporting requirements contained within Alcohol Safety Action Projects: Evaluation. In February 1972, operations of the Fairfax Alcohol Safety Action Project began and these federall...
Identification and Analysis of National Airspace System Resource Constraints
NASA Technical Reports Server (NTRS)
Smith, Jeremy C.; Marien, Ty V.; Viken, Jeffery K.; Neitzke, Kurt W.; Kwa, Tech-Seng; Dollyhigh, Samuel M.; Fenbert, James W.; Hinze, Nicolas K.
2015-01-01
This analysis is the deliverable for the Airspace Systems Program, Systems Analysis Integration and Evaluation Project Milestone for the Systems and Portfolio Analysis (SPA) focus area SPA.4.06 Identification and Analysis of National Airspace System (NAS) Resource Constraints and Mitigation Strategies. "Identify choke points in the current and future NAS. Choke points refer to any areas in the en route, terminal, oceanic, airport, and surface operations that constrain actual demand in current and projected future operations. Use the Common Scenarios based on Transportation Systems Analysis Model (TSAM) projections of future demand developed under SPA.4.04 Tools, Methods and Scenarios Development. Analyze causes, including operational and physical constraints." The NASA analysis is complementary to a NASA Research Announcement (NRA) "Development of Tools and Analysis to Evaluate Choke Points in the National Airspace System" Contract # NNA3AB95C awarded to Logistics Management Institute, Sept 2013.
ERIC Educational Resources Information Center
Brown, Chris
1998-01-01
Explored aspects of assessment of extended investigation ("project") practiced in the operational examinations of The University of Cambridge Local Examinations Syndicate (UCLES) for the perspective of construct validity. Samples of the 1993 (n=333) and 1996 (n=259) biology test results reveal two methods of assessing the project. (MAK)
ERIC Educational Resources Information Center
Stephenson, Garry; Morford, Shawn; Berry, Holly
2002-01-01
The Mill City/Gates Youth Development Project operated as a youth-at-risk program in a timber-dependent community during the timber crisis of the early 1990s. Evaluations indicate the youth activities were effective. Community support structures created by the project continue to operate 5 years after the end of funding, indicating a successful…
Project W-314 specific test and evaluation plan for transfer line SN-633 (241-AX-B to 241-AY-02A)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hays, W.H.
1998-03-20
The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-633 transfer line by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the addition of transfer line SN-633. The Project Design Specificationsmore » (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.« less
Rockstroh, M; Franke, S; Hofer, M; Will, A; Kasparick, M; Andersen, B; Neumuth, T
2017-08-01
Clinical working environments have become very complex imposing many different tasks in diagnosis, medical treatment, and care procedures. During the German flagship project OR.NET, more than 50 partners developed technologies for an open integration of medical devices and IT systems in the operating room. The aim of the present work was to evaluate a large set of the proposed concepts from the perspectives of various stakeholders. The demonstration OR is focused on interventions from the head and neck surgery and was developed in close cooperation with surgeons and numerous colleagues of the project partners. The demonstration OR was qualitatively evaluated including technical as well as clinical aspects. In the evaluation, a questionnaire was used to obtain feedback from hospital operators. The clinical implications were covered by structured interviews with surgeons, anesthesiologists and OR staff. In the present work, we qualitatively evaluate a subset of the proposed concepts from the perspectives of various stakeholders. The feedback of the clinicians indicates that there is a need for a flexible data and control integration. The hospital operators stress the need for tools to simplify risk management in openly integrated operating rooms. The implementation of openly integrated operating rooms will positively affect the surgeons, the anesthesiologists, the surgical nursing staff, as well as the technical personnel and the hospital operators. The evaluation demonstrated the need for OR integration technologies and identified the missing tools to support risk management and approval as the main barriers for future installments.
ERIC Educational Resources Information Center
Child Trends, Inc., Washington, DC.
The Project on State-Level Child Outcomes is designed to assist states and other groups to improve the measurement of child outcomes in state welfare evaluations and in other state data systems. This report summarizes the first meeting of the five states (Connecticut, Florida, Indiana, Iowa, Minnesota) that participated in the operational phase of…
Code of Federal Regulations, 2011 CFR
2011-04-01
... individual, corporation, partnership, unincorporated association, and the like and shall have no gender and... evaluation, the initiation of construction or operation of a new or expanded project, or the operation of an...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harpole, K.J.; Hill, C.J.
1983-02-01
A review of the performance of the North Stanley Polymer Demonstration Project has been completed. The objective of the cost-project was to evaluate the technical efficiency and economic feasibility of polymer-enhanced waterflooding as a tertiary recovery process in a highly heterogeneous and vertically fractured sandstone reservoir that has been successfully waterflooded and is approaching the economic limits of conventional waterflooding recovery. The ultimate incremental oil recovery from the project is estimated to be about 570,000 barrels (or approximately 1.4% of the original oil-in-place). This is significantly less than the original recovery predictions but does demonstrate that the project was technicallymore » successful. The lower-than-anticipated recovery is attributed principally to the extremely heterogeneous nature of the reservoir. One of the major objectives of this evaluation is to present an updated economic anlaysis of the North Stanley Polymer Demonstration Project. The updated economic analysis under current (mid-1982) economic conditions indicates that the North Stanley project would be commercially feasible if polymer injection had begun in 1982, rather than in 1976. Overall project operations were conducted efficiently, with a minimum of operational problems. The North Stanley polymer project provides a well-documented example of an actual field-scale tertiary application of polymer-augmented waterflooding in a highly heterogeneous reservoir.« less
DOT National Transportation Integrated Search
1976-09-01
The present report describes the client flow through rehabilitation systems of the 35 NHTSA funded Alcohol Safety Action Projects (ASAPs) during the 1972-1974 period of project operations, summarizes project initiated analyses of treatment program ef...
Planned Change in Agrarian Countries.
ERIC Educational Resources Information Center
Niehoff, Arthur H.
The report provides operationally relevant concepts and guidelines for persons responsible for planning and implementing development projects in agrarian countries. A framework for describing or evaluating the conduct of development projects is proposed, and applied to the results of an analysis of 203 case studies of past projects. Influences,…
DOE Office of Scientific and Technical Information (OSTI.GOV)
O'Brien, Kevin C.
The work summarized in this report is the first step towards a project that will re-train and create jobs for personnel in the coal industry and continue regional economic development to benefit regions impacted by previous downturns. The larger project is aimed at capturing ~300 tons/day (272 metric tonnes/day) CO 2 at a 90% capture rate from existing coal- fired boilers at the Abbott Power Plant on the campus of University of Illinois (UI). It will employ the Linde-BASF novel amine-based advanced CO 2 capture technology, which has already shown the potential to be cost-effective, energy efficient and compact atmore » the 0.5-1.5 MWe pilot scales. The overall objective of the project is to design and install a scaled-up system of nominal 15 MWe size, integrate it with the Abbott Power Plant flue gas, steam and other utility systems, and demonstrate the viability of continuous operation under realistic conditions with high efficiency and capacity. The project will also begin to build a workforce that understands how to operate and maintain the capture plants by including students from regional community colleges and universities in the operation and evaluation of the capture system. This project will also lay the groundwork for follow-on projects that pilot utilization of the captured CO 2 from coal-fired power plants. The net impact will be to demonstrate a replicable means to (1) use a standardized procedure to evaluate power plants for their ability to be retrofitted with a pilot capture unit; (2) design and construct reliable capture systems based on the Linde-BASF technology; (3) operate and maintain these systems; (4) implement training programs with local community colleges and universities to establish a workforce to operate and maintain the systems; and (5) prepare to evaluate at the large pilot scale level various methods to utilize the resulting captured CO 2. Towards the larger project goal, the UI-led team, together with Linde, has completed a preliminary design for the carbon capture pilot plant with basic engineering and cost estimates, established permitting needs, identified approaches to address Environmental, Health, and Safety concerns related to pilot plant installation and operation, developed approaches for long-term use of the captured carbon, and established strategies for workforce development and job creation that will re-train coal operators to operate carbon capture plants. This report describes Phase I accomplishments and demonstrates that the project team is well-prepared for full implementation of Phase 2, to design, build, and operate the carbon capture pilot plant.« less
NASA Countermeasures Evaluation and Validation Project
NASA Technical Reports Server (NTRS)
Lundquist, Charlie M.; Paloski, William H. (Technical Monitor)
2000-01-01
To support its ISS and exploration class mission objectives, NASA has developed a Countermeasure Evaluation and Validation Project (CEVP). The goal of this project is to evaluate and validate the optimal complement of countermeasures required to maintain astronaut health, safety, and functional ability during and after short- and long-duration space flight missions. The CEVP is the final element of the process in which ideas and concepts emerging from basic research evolve into operational countermeasures. The CEVP is accomplishing these objectives by conducting operational/clinical research to evaluate and validate countermeasures to mitigate these maladaptive responses. Evaluation is accomplished by testing in space flight analog facilities, and validation is accomplished by space flight testing. Both will utilize a standardized complement of integrated physiological and psychological tests, termed the Integrated Testing Regimen (ITR) to examine candidate countermeasure efficacy and intersystem effects. The CEVP emphasis is currently placed on validating the initial complement of ISS countermeasures targeting bone, muscle, and aerobic fitness; followed by countermeasures for neurological, psychological, immunological, nutrition and metabolism, and radiation risks associated with space flight. This presentation will review the processes, plans, and procedures that will enable CEVP to play a vital role in transitioning promising research results into operational countermeasures necessary to maintain crew health and performance during long duration space flight.
Phase C/D program development plan. Volume 1: Program plan
NASA Technical Reports Server (NTRS)
1971-01-01
The Phase C/D definition of the Modular Space Station has been developed. The modular approach selected during the option period was evaluated, requirements were defined, and program definition and preliminary design were accomplished. The Space Station Project is covered in depth, the research applications module is limited to a project-level definition, and the shuttle operations are included for interface requirements identification, scheduling, and costing. Discussed in detail are: (1) baseline program and project descriptions; (2) phase project planning; (3) modular space station program schedule; (4) program management plan; (5) operations; (6) facilities; (7) logistics; and (8) manpower.
NASA Astrophysics Data System (ADS)
Bulega, T.; Kyeyune, A.; Onek, P.; Sseguya, R.; Mbabazi, D.; Katwiremu, E.
2011-10-01
Several publications have identified technical challenges facing Uganda's National Transmission Backbone Infrastructure project. This research addresses the technical limitations of the National Transmission Backbone Infrastructure project, evaluates the goals of the project, and compares the results against the technical capability of the backbone. The findings of the study indicate a bandwidth deficit, which will be addressed by using dense wave division multiplexing repeaters, leasing bandwidth from private companies. Microwave links for redundancy, a Network Operation Center for operation and maintenance, and deployment of wireless interoperability for microwave access as a last-mile solution are also suggested.
Design and operation of an outdoor microalgae test facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weissman, J.C.; Tillett, D.M.; Goebel, R.P.
The objective of the project covered in this report is to establish and operate a facility in the American Southwest to test the concept of producing microalgae on a large scale. This microalgae would then be used as a feedstock for producing liquid fuels. The site chosen for this project was an existing water research station in Roswell, New Mexico; the climate and water resources are representative of those in the Southwest. For this project, researchers tested specific designs, modes of operation, and strains of microalgae; proposed and evaluated modifications to technological concepts; and assessed the progress toward meeting costmore » objectives.« less
What Can We Learn From Point-of-Care Blood Glucose Values Deleted and Repeated by Nurses?
Corl, Dawn; Yin, Tom; Ulibarri, May; Lien, Heather; Tylee, Tracy; Chao, Jing; Wisse, Brent E
2018-03-01
Hospitals rely on point-of-care (POC) blood glucose (BG) values to guide important decisions related to insulin administration and glycemic control. Evaluation of POC BG in hospitalized patients is associated with measurement and operator errors. Based on a previous quality improvement (QI) project we introduced an option for operators to delete and repeat POC BG values suspected as erroneous. The current project evaluated our experience with deleted POC BG values over a 2-year period. A retrospective QI project included all patients hospitalized at two regional academic medical centers in the Pacific Northwest during 2014 and 2015. Laboratory Medicine POC BG data were reviewed to evaluate all inpatient episodes of deleted and repeated POC BG. Inpatient operators choose to delete and repeat only 0.8% of all POC BG tests. Hypoglycemic and extreme hyperglycemic BG values are more likely to be deleted and repeated. Of initial values <40 mg/dL, 58% of deleted values (18% of all values) are errors. Of values >400 mg/dL, 40% of deleted values (5% of all values) are errors. Not all repeated POC BG values are first deleted. Optimal use of the option to delete and repeat POC BG values <40 mg/dL could decrease reported rates of severe hypoglycemia by as much as 40%. This project demonstrates that operators are frequently able to identify POC BG values that are measurement/operator errors. Eliminating these errors significantly reduces documented rates of severe hypoglycemia and hyperglycemia, and has the potential to improve patient safety.
ERIC Educational Resources Information Center
Roman, Elliott M.
The Alternative Learning Methodologies through Academics Project (Project ALMA) was an Elementary and Secondary Education Act Title VII-funded project in its fourth year of operation in two high schools in Queens and the Bronx (New York). The program served 436 Spanish-speaking students, most of whom were of limited English proficiency.…
IBM PC/IX operating system evaluation plan
NASA Technical Reports Server (NTRS)
Dominick, Wayne D. (Editor); Granier, Martin; Hall, Philip P.; Triantafyllopoulos, Spiros
1984-01-01
An evaluation plan for the IBM PC/IX Operating System designed for IBM PC/XT computers is discussed. The evaluation plan covers the areas of performance measurement and evaluation, software facilities available, man-machine interface considerations, networking, and the suitability of PC/IX as a development environment within the University of Southwestern Louisiana NASA PC Research and Development project. In order to compare and evaluate the PC/IX system, comparisons with other available UNIX-based systems are also included.
Project W-314 specific test and evaluation plan for AZ tank farm upgrades
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hays, W.H.
1998-08-12
The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-631 transfer line from the AZ-O1A pit to the AZ-02A pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation P1 an (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities, etc), Factory Tests and Inspections (FTIs), installation tests andmore » inspections, Construction Tests and Inspections (CTIs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). The STEP will be utilized in conjunction with the TEP for verification and validation.« less
Logic system aids in evaluation of project readiness
NASA Technical Reports Server (NTRS)
Maris, S. J.; Obrien, T. J.
1966-01-01
Measurement Operational Readiness Requirements /MORR/ assignments logic is used for determining the readiness of a complex project to go forward as planned. The system used logic network which assigns qualities to all important criteria in a project and establishes a logical sequence of measurements to determine what the conditions are.
34 CFR 379.45 - What are the additional reporting requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION PROJECTS WITH INDUSTRY What... must submit the data from its annual evaluation of project operations required under § 379.21(a)(5) no later than 60 days after the end of each project year, unless the Secretary authorizes a later...
Continuing Development of California State Packet Radio Project.
ERIC Educational Resources Information Center
Brownrigg, Edwin
1992-01-01
Provides background on the California State Library Packet Radio project, which will use packet radios to deploy a wireless, high-speed, wide-area network of 600 nodes, including 100 libraries, in the San Francisco Bay Area. Project goals and objectives, plan of operation, equipment, and evaluation plans are summarized. (MES)
Project PROBE, 1985-1986. OEA Evaluation Report.
ERIC Educational Resources Information Center
New York City Board of Education, Brooklyn. Office of Educational Assessment.
In its second year of operation, Project PROBE (Professions Oriented Bilingual Education) experienced difficulty in meeting some of its instructional objectives. The project had sought to provide instructional and supportive services to 200 Spanish-speaking students from Latin America at Louis D. Brandeis High School (Manhattan, New York) and to…
NASA Astrophysics Data System (ADS)
Izvekov, Sergei
2017-03-01
We consider the generalized Langevin equations of motion describing exactly the particle-based coarse-grained dynamics in the classical microscopic ensemble that were derived recently within the Mori-Zwanzig formalism based on new projection operators [S. Izvekov, J. Chem. Phys. 138(13), 134106 (2013)]. The fundamental difference between the new family of projection operators and the standard Zwanzig projection operator used in the past to derive the coarse-grained equations of motion is that the new operators average out the explicit irrelevant trajectories leading to the possibility of solving the projected dynamics exactly. We clarify the definition of the projection operators and revisit the formalism to compute the projected dynamics exactly for the microscopic system in equilibrium. The resulting expression for the projected force is in the form of a "generalized additive fluctuating force" describing the departure of the generalized microscopic force associated with the coarse-grained coordinate from its projection. Starting with this key expression, we formulate a new exact formula for the memory function in terms of microscopic and coarse-grained conservative forces. We conclude by studying two independent limiting cases of practical importance: the Markov limit (vanishing correlations of projected force) and the limit of weak dependence of the memory function on the particle momenta. We present computationally affordable expressions which can be efficiently evaluated from standard molecular dynamics simulations.
NASA electronic message experiment and study: Detailed test plans
NASA Technical Reports Server (NTRS)
1979-01-01
A methodology for evaluating the utility of high speed digital facsimile as a component of the projected NASA-wide electronic message network is presented. Equipment checkout, operator familiarization, pretest calibration, and the development of procedures are addressed. An experimental test program of the facsimile message service which will carry duplicates of the actual messages sent by other means is highlighted. Also, an operational test program during which messages will be sent on a regular basis in order to accumulate the information that will be used to evaluate system performance and project future growth is described.
Project SEARCH UK - Evaluating Its Employment Outcomes.
Kaehne, Axel
2016-11-01
The study reports the findings of an evaluation of Project SEARCH UK. The programme develops internships for young people with intellectual disabilities who are about to leave school or college. The aim of the evaluation was to investigate at what rate Project SEARCH provided employment opportunities to participants. The evaluation obtained data from all sites operational in the UK at the time of evaluation (n = 17) and analysed employment outcomes. Data were available for 315 young people (n = 315) in the programme and pay and other employment related data were available for a subsample. The results of the analysis suggest that Project SEARCH achieves on average employment rates of around 50 per cent. Project SEARCH UK represents a valuable addition to the supported employment provision in the UK. Its unique model should inform discussions around best practice in supported employment. Implications for other supported employment programmes are discussed. © 2015 John Wiley & Sons Ltd.
NASA Astrophysics Data System (ADS)
Zhang, L.; Li, Y.; Wu, Q.
2013-05-01
Integrated Project Delivery (IPD) is a newly-developed project delivery approach for construction projects, and the level of collaboration of project management team is crucial to the success of its implementation. Existing research has shown that collaborative satisfaction is one of the key indicators of team collaboration. By reviewing the literature on team collaborative satisfaction and taking into consideration the characteristics of IPD projects, this paper summarizes the factors that influence collaborative satisfaction of IPD project management team. Based on these factors, this research develops a fuzzy linguistic method to effectively evaluate the level of team collaborative satisfaction, in which the authors adopted the 2-tuple linguistic variables and 2-tuple linguistic hybrid average operators to enhance the objectivity and accuracy of the evaluation. The paper demonstrates the practicality and effectiveness of the method through carrying out a case study with the method.
Has computational creativity successfully made it "Beyond the Fence" in musical theatre?
NASA Astrophysics Data System (ADS)
Jordanous, Anna
2017-10-01
A significant test for software is to task it with replicating human performance, as done recently with creative software and the commercial project Beyond the Fence (undertaken for a television documentary Computer Says Show). The remit of this project was to use computer software as much as possible to produce "the world's first computer-generated musical". Several creative systems were used to generate this musical, which was performed in London's West End in 2016. This paper considers the challenge of evaluating this project. Current computational creativity evaluation methods are ill-suited to evaluating projects that involve creative input from multiple systems and people. Following recent inspiration within computational creativity research from interaction design, here the DECIDE evaluation framework is applied to evaluate the Beyond the Fence project. Evaluation finds that the project was reasonably successful at achieving the task of using computational generation to produce a credible musical. Lessons have been learned for future computational creativity projects though, particularly for affording creative software more agency and enabling software to interact with other creative partners. Upon reflection, the DECIDE framework emerges as a useful evaluation "checklist" (if not a tangible operational methodology) for evaluating multiple creative systems participating in a creative task.
ITS pilot project demonstration program summary report
DOT National Transportation Integrated Search
2008-12-01
The purpose of this contract is to conduct a technical performance analysis and operational evaluation of ITS projects : demonstrated at the Innovative Mobility Experience Showcase in conjunction with the 2005 ITS World Congress. Some : of these proj...
ERIC Educational Resources Information Center
New York City Board of Education, Brooklyn, NY. Office of Educational Research.
Student Upgrading through Computer and Career Education System Services (Project SUCCESS) was an Elementary and Secondary Education Act Title VII-funded project in its third year of operation. Project SUCCESS served 460 students of limited English proficiency at two high schools in Brooklyn and one high school in Manhattan (New York City).…
ERIC Educational Resources Information Center
Ranadive, Jyoti
Project SHARE (Staff Helping Attain Relevant Education), a project funded by Title VII of the Elementary and Secondary Education Act, was in its third and final year of operation in 1992-93, in eight primary schools in the Bronx, Brooklyn, and Manhattan (New York). The project served 141 limited English proficient students from low-income families…
Field Artillery Ammunition Processing System (FAAPS) concept evaluation study
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kring, C.T.; Babcock, S.M.; Watkin, D.C.
1992-06-01
The Field Artillery Ammunition Processing System (FAAPS) is an initiative to introduce a palletized load system (PLS) that is transportable with an automated ammunition processing and storage system for use on the battlefield. System proponents have targeted a 20% increase in the ammunition processing rate over the current operation while simultaneously reducing the total number of assigned field artillery battalion personnel by 30. The overall objective of the FAAPS Project is the development and demonstration of an improved process to accomplish these goals. The initial phase of the FAAPS Project and the subject of this study is the FAAPS conceptmore » evaluation. The concept evaluation consists of (1) identifying assumptions and requirements, (2) documenting the process flow, (3) identifying and evaluating technologies available to accomplish the necessary ammunition processing and storage operations, and (4) presenting alternative concepts with associated costs, processing rates, and manpower requirements for accomplishing the operation. This study provides insight into the achievability of the desired objectives.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kring, C.T.; Babcock, S.M.; Watkin, D.C.
1992-06-01
The Field Artillery Ammunition Processing System (FAAPS) is an initiative to introduce a palletized load system (PLS) that is transportable with an automated ammunition processing and storage system for use on the battlefield. System proponents have targeted a 20% increase in the ammunition processing rate over the current operation while simultaneously reducing the total number of assigned field artillery battalion personnel by 30. The overall objective of the FAAPS Project is the development and demonstration of an improved process to accomplish these goals. The initial phase of the FAAPS Project and the subject of this study is the FAAPS conceptmore » evaluation. The concept evaluation consists of (1) identifying assumptions and requirements, (2) documenting the process flow, (3) identifying and evaluating technologies available to accomplish the necessary ammunition processing and storage operations, and (4) presenting alternative concepts with associated costs, processing rates, and manpower requirements for accomplishing the operation. This study provides insight into the achievability of the desired objectives.« less
Civil Affairs Framework For Executing Governance
2017-12-01
evaluation (p. 3). An example of performance management is the evaluation of the above school construction project beginning with receiving notification...Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management ...and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. 1. AGENCY USE ONLY (Leave blank) 2. REPORT DATE December 2017 3
The history and nature of the Baltimore applications project
NASA Technical Reports Server (NTRS)
Peake, H. J.
1978-01-01
The Baltimore Applications Project (BAP), an experiment jointly conducted by the City of Baltimore and the National Aeronautics and Space Administration (NASA), was begun in May 1974 in response to a request by the City. The main purpose of the BAP is the identification of technology for beneficial application to the City operations. An independent evaluation, performed after three years of operation, indicates very good project results and confirms the choices of the experiment's basic features. The BAP demonstrates one way to achieve successful intergovernmental transfer of Federal technology.
Travlink Operational Test Evaluation Report; Final Report
DOT National Transportation Integrated Search
1996-08-01
">THE OBJECTIVES OF THE TRAVLINK OPERATIONAL TEST WERE TO IMPROVE TRANSIT FLEET MANAGEMENT, IMPROVE THE TIMELINESS AND ACCURACY OF TRAVEL INFORMATION, AND ENCOURAGE TRANSIT RIDERSHIP. THE PROJECT'S CORRIDOR WAS A NEWLY RECONSTRUCTED FREEWAY THAT WAS ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pennock, Kenneth; Makarov, Yuri V.; Rajagopal, Sankaran
The need for proactive closed-loop integration of uncertainty information into system operations and probability-based controls is widely recognized, but rarely implemented in system operations. Proactive integration for this project means that the information concerning expected uncertainty ranges for net load and balancing requirements, including required balancing capacity, ramping and ramp duration characteristics, will be fed back into the generation commitment and dispatch algorithms to modify their performance so that potential shortages of these characteristics can be prevented. This basic, yet important, premise is the motivating factor for this project. The achieved project goal is to demonstrate the benefit of suchmore » a system. The project quantifies future uncertainties, predicts additional system balancing needs including the prediction intervals for capacity and ramping requirements of future dispatch intervals, evaluates the impacts of uncertainties on transmission including the risk of overloads and voltage problems, and explores opportunities for intra-hour generation adjustments helping to provide more flexibility for system operators. The resulting benefits culminate in more reliable grid operation in the face of increased system uncertainty and variability caused by solar power. The project identifies that solar power does not require special separate penetration level restrictions or penalization for its intermittency. Ultimately, the collective consideration of all sources of intermittency distributed over a wide area unified with the comprehensive evaluation of various elements of balancing process, i.e. capacity, ramping, and energy requirements, help system operators more robustly and effectively balance generation against load and interchange. This project showed that doing so can facilitate more solar and other renewable resources on the grid without compromising reliability and control performance. Efforts during the project included developing and integrating advanced probabilistic solar forecasts, including distributed PV forecasts, into closed –loop decision making processes. Additionally, new uncertainty quantifications methods and tools for the direct integration of uncertainty and variability information into grid operations at the transmission and distribution levels were developed and tested. During Phase 1, project work focused heavily on the design, development and demonstration of a set of processes and tools that could reliably and efficiently incorporate solar power into California’s grid operations. In Phase 2, connectivity between the ramping analysis tools and market applications software were completed, multiple dispatch scenarios demonstrated a successful reduction of overall uncertainty and an analysis to quantify increases in system operator reliability, and the transmission and distribution system uncertainty prediction tool was introduced to system operation engineers in a live webinar. The project met its goals, the experiments prove the advancements to methods and tools, when working together, are beneficial to not only the California Independent System Operator, but the benefits are transferable to other system operators in the United States.« less
The Many Dimensions of Program Management
NASA Technical Reports Server (NTRS)
Dean, Edwin B.
1992-01-01
For the purposes of this paper, program refers to a collection of activities or projects which must be performed according to a plan or schedule. The Space Exploration Initiative within the National Aeronautics and Space Administration (NASA) is an example. Dimensionality refers to both the various perspectives of a program and to the components within that perspective. It is, thus, appropriate to think of dimensions of dimensionality. For example, one dimension or perspective of a program is the projects which perform the program. Within the project dimension, the individual projects are the components of that dimensionality. The number of projects defines the spatial dimensionality of the project dimension. Thus, each perspective or dimension has a dimensionality of its own. The structure and associated values of all the various perspectives of a program define the program. A project refers to the collection of activities required to conceive, sell, design, develop, evaluate, produce, operate, support, evolve, and retire a given system. A project thus effects the life cycle of given system. A project is, thus, the system to conceive, sell, design, develop, evaluate, produce, operate, support, evolve, and retire a system. A program, thus, effects the life cycle of the collection of projects required to effect the collection of systems required to implement the program.
DOT National Transportation Integrated Search
2011-10-01
The objective of this project was to develop fleet location, route decision, material selection, and treatment procedures for winter snow removal operations to improve MoDOTs services and lower costs. This work uses a systematic, heuristic-based o...
Assessing the value of delay to truckers and carriers.
DOT National Transportation Integrated Search
2011-07-01
This project evaluates the value of delay (VOD) to commercial vehicle operators due to highway congestion. : The VOD for congestion is a fundamental parameter driving the private sectors response to public freight : projects and policies such as c...
Assessing the value of delay to truckers and carriers.
DOT National Transportation Integrated Search
2011-07-01
This project evaluates the value of delay (VOD) to commercial vehicle operators due to highway congestion. The VOD for : congestion is a fundamental parameter driving the private sectors response to public freight projects and policies such as cor...
Electric vehicle fleet implications and analysis : final research project report.
DOT National Transportation Integrated Search
2016-11-01
The objective of this project was to evaluate the implementation and effectiveness of : electric vehicles (EVs) used in fleet operations. The study focuses on Battery-Electric : Vehicles (BEVs) and Plug-In Hybrid Electric Vehicles (PHEVs); collective...
34 CFR 642.21 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2011 CFR
2011-07-01
... looks for information that shows methods of evaluation that are appropriate for the project and, to the... operation for the project. (2) The Secretary looks for information that shows— (i) High quality in the design of the project; (ii) An effective plan of managment that insures proper and efficient...
42 CFR 51b.605 - How will grant applications be evaluated and the grants awarded?
Code of Federal Regulations, 2010 CFR
2010-10-01
...? (3) Is the method of operation logical and clearly related to project objectives, and does it... HUMAN SERVICES GRANTS PROJECT GRANTS FOR PREVENTIVE HEALTH SERVICES Grants for Research, Demonstrations... following criteria: (1) Is there adequate evidence that the proposed project is needed and that the outcome...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lail, Marty
The project aimed to advance RTI’s non-aqueous amine solvent technology by improving the solvent to reduce volatility, demonstrating long-term continuous operation at lab- (0.5 liters solvent) and bench-scale (~120 liters solvent), showing low reboiler heat duty measured during bench-scale testing, evaluating degradation products, building a rate-based process model, and evaluating the techno-economic performance of the process. The project team (RTI, SINTEF, Linde Engineering) and the technology performed well in each area of advancement. The modifications incorporated throughout the project enabled the attainment of target absorber and regenerator conditions for the process. Reboiler duties below 2,000 kJt/kg CO2 were observed inmore » a bench-scale test unit operated at RTI.« less
NASA Technical Reports Server (NTRS)
1980-01-01
The cost estimation and economic evaluation methodologies presented are consistent with industry practice for assessing capital investment requirements and operating costs of coal conversion systems. All values stated are based on January, 1980 dollars with appropriate recognition of the time value of money. Evaluation of project economic feasibility can be considered a two step process (subject to considerable refinement). First, the costs of the project must be quantified and second, the price at which the product can be manufacturd must be determined. These two major categories are discussed. The summary of methodology is divided into five parts: (1) systems costs, (2)instant plant costs, (3) annual operating costs, (4) escalation and discounting process, and (5) product pricing.
Weigh-in-Motion systems evaluation : final report.
DOT National Transportation Integrated Search
1976-04-01
This relatively short-term project was initiated in order to perfect installation, operation, and maintenance practices necessary for continued accurate and reliable operation of a computerized Weigh-in-Motion system which will be used to gather truc...
DOT National Transportation Integrated Search
1999-01-01
In 1997, the Ann Arbor (Michigan) Transportation Authority began deploying advanced public transportation systems (APTS) technologies in its fixed route and paratransit operations. The project's concept is the integration of a range of such technolog...
American Fuel Cell Bus Project Evaluation : Second Report
DOT National Transportation Integrated Search
2015-09-01
This report presents results of the American Fuel Cell Bus (AFCB) Project, a demonstration of fuel cell electric buses (FCEB) operating in the Coachella Valley area of California. The prototype AFCB was developed as part of the Federal Transit Admini...
ERIC Educational Resources Information Center
Roman, Elliott M.
In 1993-94 the Career Awareness Program for Bilingual Haitian and Hispanic Students (Project CAP) was in its fifth and final year as an Elementary and Secondary Education Act Title VII project. Project CAP operated at two high schools in Brooklyn (New York), serving 136 Haitians at one and an undetermined number of Spanish-speaking and Haitian…
ERIC Educational Resources Information Center
Augustin, Marc
The Acquisition of Learning by Facilitating Academics (Project ALFA) was an Elementary and Secondary Education Act Title VII-funded project in its second year in 1993-94. The project operated at a high school in Brooklyn, and served 75 Haitian-speaking students of limited English proficiency with fewer than 5 years in an English-speaking school.…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hughes, Jamie D.
2012-05-30
The purpose of the Operational Testing and Evaluation (OT&E) phases of the project is to prepare for turnover of the Megaports System supplied by U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA)—located at the Export Lanes of the Port of Lazaro Cardenas, Mexico—to the Government of Mexico (GOM).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Keller, Carl J.
2004-07-13
BPA proposes to fund IDFG to plan and complete construction of fish passage improvements and water conservation activities that are contained within IDFG’s Statement of Work (SOW) for the period 7/1/04 to 6/30/05. The funding request contained in their SOW is part of an ongoing IDFG effort to fund anadromous fish passage projects that fall outside the scope of the Mitchell Act. The proposed SOW activities fall within the following four categories: Phase I-Planning and Design (gather data, perform investigations, and exchange information; perform surveys and assessments to be compliant; survey project sites and perform engineering designs; perform contract andmore » project management); Phase II-Construction and Implementation (procure materials and supplies, prepare contracts and solicit bids, plant native seedlings, complete capital improvements); Phase III-Operation and Maintenance (maintain office operations); and Phase IV- Monitoring and Evaluation (monitor and evaluate post-project effects, reporting). The SOW culminates with proposed construction of 18 capital improvement projects (Table 1 attached). The types of capital improvements include: screening gravity water diversions; consolidating and/or eliminating ditches; evaluating and screening pump diversions; evaluating and implementing water conservation activities; constructing screens along migration routes and rearing areas for hatchery and wild salmon; improving upstream and downstream passage for anadromous fish; and maximize benefits to aquatic habitat. Because each of the proposed projects in the SOW is still in the planning stages, the specifics of each still need to be completed.« less
Mercury Deposition Network Site Operator Training for the System Blank and Blind Audit Programs
Wetherbee, Gregory A.; Lehmann, Christopher M.B.
2008-01-01
The U.S. Geological Survey operates the external quality assurance project for the National Atmospheric Deposition Program/Mercury Deposition Network. The project includes the system blank and blind audit programs for assessment of total mercury concentration data quality for wet-deposition samples. This presentation was prepared to train new site operators and to refresh experienced site operators to successfully process and submit system blank and blind audit samples for chemical analysis. Analytical results are used to estimate chemical stability and contamination levels of National Atmospheric Deposition Program/Mercury Deposition Network samples and to evaluate laboratory variability and bias.
42 CFR 136.101 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... OF HEALTH AND HUMAN SERVICES INDIAN HEALTH Grants for Development, Construction, and Operation of... including feasibility studies, construction, operation, provision, or maintenance of services and facilities provided to Indians and, (b) for projects for planning, training, evaluation or other activities designed...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-10
... transit service which will satisfy the long-term regional mobility and local accessibility needs for... connections; energy use; and safety and security. Effects will be evaluated in the context of both short-term construction and long-term operation of the proposed project. Direct project effects as well as indirect and...
Buddy-Tutor Project. Hilo Intermediate School. Final Report, March-July, 1974.
ERIC Educational Resources Information Center
Hawaii Univ., Honolulu. Social Welfare Development and Research Center.
An operational description of the 1973-74 Buddy-Tutor Project at Hilo Intermediate School in Hilo, Hawaii and an evaluative assessment of its outcome with statistical treatment of the data is provided in this report. This project is an exploratory behavioral intervention program for educationally deprived students and focuses its efforts on the…
BC Transit Fuel Cell Bus Project Evaluation Results : Second Report
DOT National Transportation Integrated Search
2014-09-01
Beginning in 2009, British Columbia Transit (BC Transit) led a project to conduct a 5-year demonstration of 20 fuel cell electric buses (FCEB) in Whistler, Canada. The FCEB fleet was introduced during the 2010 Winter Olympic Games and operated throug...
Code of Federal Regulations, 2011 CFR
2011-01-01
... FOOD STAMP AND FOOD DISTRIBUTION PROGRAM PERFORMANCE REPORTING SYSTEM Management Evaluation (ME... problems and the causes of those problems. As each project area's operational structure will differ, State agencies shall review each program requirement applicable to the project area in a manner which will best...
American Fuel Cell Bus Project Evaluation : Third Report
DOT National Transportation Integrated Search
2017-05-01
This report presents results of the American Fuel Cell Bus (AFCB) Project, a demonstration of fuel cell electric buses (FCEB) operating in the Coachella Valley area of California. The AFCB, built on an ElDorado National-California 40-foot Axess bus p...
The U.S. EPA operates the Environmental and Sustainable Technology Evaluation (ESTE) program to facilitate the deployment of innovative technologies through performance verification and information dissemination. This ESTE project involved evaluation of co-firing common woody bio...
Designing Facilities for Collaborative Operations
NASA Technical Reports Server (NTRS)
Norris, Jeffrey; Powell, Mark; Backes, Paul; Steinke, Robert; Tso, Kam; Wales, Roxana
2003-01-01
A methodology for designing operational facilities for collaboration by multiple experts has begun to take shape as an outgrowth of a project to design such facilities for scientific operations of the planned 2003 Mars Exploration Rover (MER) mission. The methodology could also be applicable to the design of military "situation rooms" and other facilities for terrestrial missions. It was recognized in this project that modern mission operations depend heavily upon the collaborative use of computers. It was further recognized that tests have shown that layout of a facility exerts a dramatic effect on the efficiency and endurance of the operations staff. The facility designs (for example, see figure) and the methodology developed during the project reflect this recognition. One element of the methodology is a metric, called effective capacity, that was created for use in evaluating proposed MER operational facilities and may also be useful for evaluating other collaboration spaces, including meeting rooms and military situation rooms. The effective capacity of a facility is defined as the number of people in the facility who can be meaningfully engaged in its operations. A person is considered to be meaningfully engaged if the person can (1) see, hear, and communicate with everyone else present; (2) see the material under discussion (typically data on a piece of paper, computer monitor, or projection screen); and (3) provide input to the product under development by the group. The effective capacity of a facility is less than the number of people that can physically fit in the facility. For example, a typical office that contains a desktop computer has an effective capacity of .4, while a small conference room that contains a projection screen has an effective capacity of around 10. Little or no benefit would be derived from allowing the number of persons in an operational facility to exceed its effective capacity: At best, the operations staff would be underutilized; at worst, operational performance would deteriorate. Elements of this methodology were applied to the design of three operations facilities for a series of rover field tests. These tests were observed by human-factors researchers and their conclusions are being used to refine and extend the methodology to be used in the final design of the MER operations facility. Further work is underway to evaluate the use of personal digital assistant (PDA) units as portable input interfaces and communication devices in future mission operations facilities. A PDA equipped for wireless communication and Ethernet, Bluetooth, or another networking technology would cost less than a complete computer system, and would enable a collaborator to communicate electronically with computers and with other collaborators while moving freely within the virtual environment created by a shared immersive graphical display.
ERIC Educational Resources Information Center
Harrington, Mary
The Free to Grow pilot project, developed by the Charles R. Drew University of Medicine and Science and its Head Start project, operated between 1994 and 1999. Following a 2-year planning and development stage, 5 project sites went on to complete the 3-year implementation phase in California, Colorado, Kentucky, New York, and Puerto Rico; the…
ERIC Educational Resources Information Center
Cantalupo, Denise
Project CHOICE was an Elementary and Secondary Education Act Title VII-funded project in its fifth and final year of operation at Fort Hamilton High School in Brooklyn and Springfield Gardens High School in Queens (both in New York City). In 1992-93 the project served 364 students of limited English proficiency. Participants received instruction…
34 CFR 644.21 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2011 CFR
2011-07-01
... provided under paragraph (a) of this section, and attainable, given the project's plan of operation, budget... applications. (c) Plan of operation (30 points). The Secretary evaluates the quality of the applicant's plan of operation on the basis of the following: (1) (4 points) The plan to inform the residents, schools, and...
34 CFR 644.21 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2012 CFR
2012-07-01
... provided under paragraph (a) of this section, and attainable, given the project's plan of operation, budget... applications. (c) Plan of operation (30 points). The Secretary evaluates the quality of the applicant's plan of operation on the basis of the following: (1) (4 points) The plan to inform the residents, schools, and...
34 CFR 644.21 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2013 CFR
2013-07-01
... provided under paragraph (a) of this section, and attainable, given the project's plan of operation, budget... applications. (c) Plan of operation (30 points). The Secretary evaluates the quality of the applicant's plan of operation on the basis of the following: (1) (4 points) The plan to inform the residents, schools, and...
34 CFR 644.21 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2014 CFR
2014-07-01
... provided under paragraph (a) of this section, and attainable, given the project's plan of operation, budget... applications. (c) Plan of operation (30 points). The Secretary evaluates the quality of the applicant's plan of operation on the basis of the following: (1) (4 points) The plan to inform the residents, schools, and...
Capital and Operating Costs of Small Arsenic Removal Adsorptive Media Systems
The U.S. Environmental Protection Agency (EPA) conducted 50 full-scale demonstration projects on treatment systems removing arsenic from drinking water in 26 states throughout the U.S. The projects were conducted to evaluate the performance, reliability, and cost of arsenic remo...
DOT National Transportation Integrated Search
1998-08-01
The DIRECT project compared four low-cost driver information systems. Of the four that were : compared, the RDS approach proved superior to the others in toggling reliability and voice quality. The DIRECT project planned to expand the implementation ...
The U.S. EPA operates the Environmental and Sustainable Technology Evaluation (ESTE) program to facilitate the deployment of innovative technologies through performance verification and information dissemination. This ESTE project involved evaluation of co-firing common woody bio...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fitzgerald, Jesse
2011-02-24
The presence of workmanship defects at the Kansas City Plant (KCP) is not a new problem nor is it an easy one to remedy. The lack of well defined parameters, subjective evaluations, and operator dependency makes this problem difficult to analyze. At the time of project assignment, workmanship defects comprised approximately 50% of all non-conformance reports for internally produced products. Not all of these non-conformances result in product rejections, thus inferring that inconsistency in evaluations were present. The purpose of this study was to identify a method for evaluating an operator’s ability to properly characterize subjective defects. Since the scopemore » of the project was limited to no funding, scratch depth was selected as the only criteria to evaluate. It was determined that the introduction of a reference standard coupled with a predefined gate-sorting technique approved by the customer can statistically improve an operators ability to perform subjective evaluations.« less
WTS-4 system verification unit for wind/hydroelectric integration study
NASA Technical Reports Server (NTRS)
Watts, A. W.
1982-01-01
The Bureau of Reclamation (Reclamation) initiated a study to investigate the concept of integrating 100 MW of wind energy from megawatt-size wind turbines with the Federal hydroelectric system. As a part of the study, one large wind turbine was purchased through the competitive bid process and is now being installed to serve as a system verification unit (SVU). Reclamation negotiated an agreement with NASA to provide technical management of the project for the design, fabrication, installation, testing, and initial operation. Hamilton Standard was awarded a contract to furnish and install its WTS-4 wind turbine rated at 4 MW at a site near Medicine Bow, Wyoming. The purposes for installing the SVU are to fully evaluate the wind/hydro integration concept, make technical evaluation of the hardware design, train personnel in the technology, evaluate operation and maintenance aspects, and evaluate associated environmental impacts. The SVU will be operational in June 1982. Data from the WTS-4 and from a second SVU, Boeing's MOD-2, will be used to prepare a final design for a 100-MW farm if Congress authorizes the project.
Beyond the Classroom: Experiences of a School-Based Services Project.
ERIC Educational Resources Information Center
Iscoe, Louise K.
The Hogg Foundation for Mental Health created the School of the Future (SoF) project to enable selected Texas schools to coordinate and implement school-based social and health services on their campuses and to demonstrate the effectiveness of this method of service delivery by evaluating the project. The SoF operated in four sites, each with a…
ERIC Educational Resources Information Center
Musante, Patricia
Guidance Oriented Acquisition of Learning Skills (Project GOALS) was a federally-funded project in three Brooklyn (New York) high schools in its fourth year of operation in 1992-93. It served 312 limited-English-proficient and 57 English-proficient students through instruction in English as a Second Language (ESL), native language arts (NLA) in…
ERIC Educational Resources Information Center
Nicolaidis, Mary; Sica, Michael
The major goal of Project SPEED (at Fort Hamilton High School, Brooklyn, New York) was dropout prevention. In its first year of operation, 1982-83, the project provided English as a Second Language (ESL) instruction, bilingual instruction in basic skills required for graduation, and guidance services to approximately 300 limited English proficient…
ERIC Educational Resources Information Center
Warner, Paul D.; Clearfield, Frank
The Green Thumb Project was designed to test the feasibility of operating a computerized system for disseminating weather, market, and other agricultural production and management information on a day-to-day basis; to develop a prototype software support system for the test; and to provide essential project information on conduct of the test to…
Project Data-Tech. Final Evaluation Report, 1993-1994. OER Report.
ERIC Educational Resources Information Center
Roman, Elliott M.
Project Data-Tech was an Elementary and Secondary Education Act Title VII-funded project in its fifth and last year of operation at a high school in Brooklyn (New York). The program served a total of 131 Haitian- and Spanish-speaking students, most of whom were of limited English proficiency, 54 fewer than in the previous year. Participating…
ERIC Educational Resources Information Center
Greene, Andrea; And Others
In 1991 the Department of Health and Human Services funded 32 sites throughout the United States to develop and implement Head Start-Public School Early Childhood Transition Demonstration Projects. The purpose of 31 projects, which are in their fourth year of operation, is to stimulate partnerships among Head Start agencies, public schools, and…
Evaluation of green house gas emissions models.
DOT National Transportation Integrated Search
2014-11-01
The objective of the project is to evaluate the GHG emissions models used by transportation agencies and industry leaders. Factors in the vehicle : operating environment that may affect modal emissions, such as, external conditions, : vehicle fleet c...
Adaptive Urban Signal Control and Integration (AUSCI) : evaluation final report
DOT National Transportation Integrated Search
2000-10-01
This report presents an evaluation of the Adaptive Urban Signal Control and Integration (AUSCI) Intelligent Transportation System (ITS) Field Operational Test in Minneapolis, Minnesota. The project involved a 56-intersection portion of Minneapolis, e...
GATEWAY Demonstrations: Long-Term Evaluation of SSL Field Performance in Select Interior Projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Davis, Tess E.; Davis, Robert G.; Wilkerson, Andrea M.
The GATEWAY program evaluated the long-term performance characteristics (chromaticity change, maintained illuminance, and operations and maintenance) of LED lighting systems in four field installations previously documented in separate DOE GATEWAY reports.
Cross-cutting study of advanced rural transportation system ITS field operational tests
DOT National Transportation Integrated Search
1998-08-01
USDOT has funded seven Advanced Rural Transportation System (ARTS) projects focused on traveler safety under the ITS Field Operational Test Program. Booz-Allen & Hamilton was contracted to oversee the evaluation of these (as well as 50+ other) field ...
Operating Systems. Curriculum Improvement Project. Region II.
ERIC Educational Resources Information Center
Wagstaff, Charlene
This course curriculum is intended for community college instructors and administrators to use in implementing an operating systems course. A student's course syllabus provides this information: credit hours, catalog description, prerequisites, required texts, instructional process, objectives, student evaluation, and class schedule. A student…
Evaluating the Impact of AIRS Observations on Regional Forecasts at the SPoRT Center
NASA Technical Reports Server (NTRS)
Zavodsky, Bradley
2011-01-01
NASA Short-term Prediction Research and Transition (SPoRT) Center collaborates with operational partners of different sizes and operational goals to improve forecasts using targeted projects and data sets. Modeling and DA activities focus on demonstrating utility of NASA data sets and capabilities within operational systems. SPoRT has successfully assimilated the Atmospheric Infrared Sounder (AIRS) radiance and profile data. A collaborative project is underway with the Joint Center for Satellite Data Assimilation (JCSDA) to use AIRS profiles to better understand the impact of AIRS radiances assimilated within Gridpoint Statistical Interpolation (GSI) in hopes of engaging the operational DA community in a reassessment of assimilation methodologies to more effectively assimilate hyperspectral radiances.
In-space propellant logistics. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
1972-01-01
The study addresses the systems and operational problems associated with the transport, transfer, and storage of cryogenic propellants in low earth orbits. The safety problems connected with in-space propellant logistics operations are also considered.Correlation between the two projects was maintained by including safety considerations, resulting from the system safety analysis, in the trade studies and evaluations of alternate operating concepts in the systems operations analysis.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sacuta, Norm; Young, Aleana; Worth, Kyle
2015-12-22
The IEAGHG Weyburn-Midale CO₂ Monitoring and Storage Project (WMP) began in 2000 with the first four years of research that confirmed the suitability of the containment complex of the Weyburn oil field in southeastern Saskatchewan as a storage location for CO₂ injected as part of enhanced oil recovery (EOR) operations. The first half of this report covers research conducted from 2010 to 2012, under the funding of the United States Department of Energy (contract DEFE0002697), the Government of Canada, and various other governmental and industry sponsors. The work includes more in-depth analysis of various components of a measurement, monitoring andmore » verification (MMV) program through investigation of data on site characterization and geological integrity, wellbore integrity, storage monitoring (geophysical and geochemical), and performance/risk assessment. These results then led to the development of a Best Practices Manual (BPM) providing oilfield and project operators with guidance on CO₂ storage and CO₂-EOR. In 2013, the USDOE and Government of Saskatchewan exercised an optional phase of the same project to further develop and deploy applied research tools, technologies, and methodologies to the data and research at Weyburn with the aim of assisting regulators and operators in transitioning CO₂-EOR operations into permanent storage. This work, detailed in the second half of this report, involves seven targeted research projects – evaluating the minimum dataset for confirming secure storage; additional overburden monitoring; passive seismic monitoring; history-matched modelling; developing proper wellbore design; casing corrosion evaluation; and assessment of post CO₂-injected core samples. The results from the final and optional phases of the Weyburn-Midale Project confirm the suitability of CO₂-EOR fields for the injection of CO₂, and further, highlight the necessary MMV and follow-up monitoring required for these operations to be considered permanent storage.« less
Maulik, Pallab K; Kallakuri, Sudha; Devarapalli, Siddhardha
2018-01-01
Background: There are large gaps in the delivery of mental health care in low- and middle-income countries such as India, and the problems are even more acute in rural settings due to lack of resources, remoteness, and lack of infrastructure, amongst other factors. The Systematic Medical Appraisal Referral and Treatment (SMART) Mental Health Project was conceived as a mental health services delivery model using technology-based solutions for rural India. This paper reports on the operational strategies used to facilitate the implementation of the intervention. Method: Key components of the SMART Mental Health Project included delivering an anti-stigma campaign, training of primary health workers in screening, diagnosing and managing stress, depression and increased suicide risk and task sharing of responsibilities in delivering care; and using mobile technology based electronic decision support systems to support delivery of algorithm based care for such disorders. The intervention was conducted in 42 villages across two sites in the state of Andhra Pradesh in south India. A pre-post mixed methods evaluation was done, and in this paper operational challenges are reported. Results: Both quantitative and qualitative results from the evaluation from one site covering about 5000 adults showed that the intervention was feasible and acceptable, and initial results indicated that it was beneficial in increasing access to mental health care and reducing depression and anxiety symptoms. A number of strategies were initiated in response to operational challenges to ensure smoother conduct of the project and facilitated the project to be delivered as envisaged. Conclusions: The operational strategies initiated for this project were successful in ensuring the delivery of the intervention. Those, coupled with other more systematic processes have informed the researchers to understand key processes that need to be in place to develop a more robust study, that could eventually be scaled up.
NASA Astrophysics Data System (ADS)
Frederick, M. E.; Cox, E. L.; Friedl, L. A.
2006-12-01
NASA's Earth Science Theme is charged with implementing NASA Strategic Goal 3A to "study Earth from space to advance scientific understanding and meet societal needs." In the course of meeting this objective, NASA produces research results, such as scientific observatories, research models, advanced sensor and space system technology, data active archives and interoperability technology, high performance computing systems, and knowledge products. These research results have the potential to serve society beyond their intended purpose of answering pressing Earth system science questions. NASA's Applied Sciences Program systematically evaluates the potential of the portfolio of research results to serve society by conducting projects in partnership with regional/national scale operational partners with the statutory responsibility to inform decision makers. These projects address NASA's National Applications and the societal benefit areas under the IEOS and GEOSS. Prototyping methods are used in two ways in NASA's Applied Sciences Program. The first is part of the National Applications program element, referred to as Integrated Systems Solutions (ISS) projects. The approach for these projects is to use high fidelity prototypes to benchmark the assimilation of NASA research results into our partners' decision support systems. The outcome from ISS projects is a prototype system that has been rigorously tested with the partner to understand the scientific uncertainty and improved value of their modified system. In many cases, these completed prototypes are adopted or adapted for use by the operational partners. The second falls under the Crosscutting Solutions program element, referred to as Rapid Prototyping (RP) experiments. The approach for RP experiments is to use low fidelity prototypes that are low cost and quickly produced to evaluate the potential of the breadth of NASA research results to serve society. The outcome from the set of RP experiments is an evaluation of many and varied NASA research results for their potential to be candidates for further development as an ISS project. The intention is to seed the community with many creative ideas for projects that use "un-applied" NASA research results to serve society, such as simulations of future missions.
NASA Technical Reports Server (NTRS)
Fern, Lisa Carolynn
2017-01-01
The primary activity for the UAS-NAS Human Systems Integration (HSI) sub-project in Phase 1 was support of RTCA Special Committee 228 Minimum Operational Performance Standards (MOPS). We provide data on the effect of various Detect and Avoid (DAA) display features with respect to pilot performance of the remain well clear function in order to determine the minimum requirements for DAA displays.
Low-Cost, Full-Field Surface Profiling Tool for Mechanical Damage Evaluation
DOT National Transportation Integrated Search
2010-03-03
In this project, Intelligent Optical Systems (IOS) developed an inexpensive, full-field, surfaceprofiling tool for mechanical damage evaluation based on the processing of a single digital image. Little operator training is required for acquiring the ...
Evaluation of the use of live aerial video for traffic management.
DOT National Transportation Integrated Search
1995-01-01
This report describes the evaluation of an intelligent transportation system (ITS) demonstration project in which live aerial video of traffic conditions was captured by a rotary wing aircraft operated by the Fairfax County (Virginia) Police Departme...
Arroyo-Johnson, Cassandra; Allen, Michele L; Colditz, Graham A; Hurtado, G Ali; Davey, Cynthia S; Sanders Thompson, Vetta L; Drake, Bettina F; Svetaz, Maria Veronica; Rosas-Lee, Maira; Goodman, Melody S
2015-01-01
Community Networks Program (CNP) centers are required to use a community-based participatory research (CBPR) approach within their specific priority communities. Not all communities are the same and unique contextual factors and collaborators' priorities shape each CBPR partnership. There are also established CBPR and community engagement (CE) principles shown to lead to quality CBPR in any community. However, operationalizing and assessing CBPR principles and partnership outcomes to understand the conditions and processes in CBPR that lead to achieving program and project level goals is relatively new in the science of CBPR. We sought to describe the development of surveys on adherence to and implementation of CBPR/CE principles at two CNP centers and examine commonalities and differences in program-versus project-level CBPR evaluation. A case study about the development and application of CBPR/CE principles for the Missouri CNP, Program for the Elimination of Cancer Disparities, and Minnesota CNP, Padres Informados/Jovenes Preparados, surveys was conducted to compare project versus program operationalization of principles. Survey participant demographics were provided by CNP. Specific domains found in CBPR/CE principles were identified and organized under an existing framework to establish a common ground. Operational definitions and the number of survey items were provided for each domain by CNP. There are distinct differences in operational definitions of CBPR/CE principles at the program and project levels of evaluation. However, commonalities support further research to develop standards for CBPR evaluation across partnerships and at the program and project levels.
75 FR 13727 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-23
... Nutrition Service Title: Performance Reporting System, Management Evaluation. OMB Control Number: 0584-0010... and project area is operating the Supplemental Nutrition Assistance Program (SNAP) in accordance with the Act, regulations, and the State agency's Plan of Operation. Section 11 of the Food and Nutrition...
DOT National Transportation Integrated Search
2018-01-01
This study was conducted to explore the current state-of-the-practice of Transportation Systems Management and Operations (TSM&O) in the Florida Department of Transportation (FDOT) and determine what would be required to mainstream TSM&O throughout t...
Project Startup: Evaluating the Performance of Electric Buses
DOE Office of Scientific and Technical Information (OSTI.GOV)
2016-04-01
The National Renewable Energy Laboratory (NREL) is evaluating the in-service performance of fast-charge battery electric buses compared to compressed natural gas (CNG) buses operated by Foothill Transit in West Covina, California. Launched in 2015 in collaboration with the California Air Resources Board, this study aims to improve understanding of the overall use and effectiveness of fast-charge electric buses and associated charging infrastructure in transit operation.
2013-07-01
Systems Engineering Approach and Metrics for Evaluating Network-Centric Operations for U.S. Army Battle Command by Jock O. Grynovicki and...Battle Command Jock O. Grynovicki and Teresa A. Branscome Human Research and Engineering Directorate, ARL...NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Jock O. Grynovicki and Teresa A. Branscome 5d. PROJECT NUMBER 622716H70 5e. TASK NUMBER
Project Developmental Continuity: Field Procedures Manual.
ERIC Educational Resources Information Center
Morris, Mary
This operations manual for field staff (site monitors, site coordinators, and testers) involved in the observation and testing of children is part of a series of documents on the evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's…
Preservation Health Check: Monitoring Threats to Digital Repository Content
ERIC Educational Resources Information Center
Kool, Wouter; van der Werf, Titia; Lavoie, Brian
2014-01-01
The Preservation Health Check (PHC) project, undertaken as a joint effort by Open Planets Foundation (OPF) and OCLC Research, aims to evaluate the usefulness of the preservation metadata created and maintained by operational repositories for assessing basic preservation properties. The PHC project seeks to develop an implementable logic to support…
Education North Evaluation (1978-1982) and Alternative Programs Source Book. Summary.
ERIC Educational Resources Information Center
Department of Regional Economic Expansion, Ottawa (Ontario).
Projects such as Education North, a pilot project for community involvement in education conducted by the Alberta government, can be successful in geographically and culturally isolated communities where social, cultural, and political conflicts affect education. Between 1979 and 1982, Education North operated local education societies in six…
34 CFR 379.45 - What are the additional reporting requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION PROJECTS WITH INDUSTRY What Conditions Must Be Met by a Grantee? § 379.45 What are the additional reporting requirements? Each grantee must submit the data from its annual evaluation of project operations required under § 379.21(a)(5) no...
Zhang, Q H; Wang, X C; Xiong, J Q; Chen, R; Cao, B
2010-03-01
In order to illuminate the benefit of a wastewater treatment and reuse project, a life cycle assessment (LCA) model was proposed by combining the process-based LCA and the input-output based LCA in one framework and using energy consumption as the sole parameter for quantitative evaluation of the project. The life cycle consumption was evaluated mainly by life cycle inventory (LCI) analysis taking into account the construction phase, operation phase and demolishment phase of the project. For evaluating the life cycle benefit of treated water reuse, attention was paid to the decrease of secondary effluent discharge and water saving. As a result of comprehensive LCA analysis of a case project in Xi'an, China, it was understood that the life cycle benefit gained from treated wastewater reuse much surpassed the life cycle energy consumption. The advantage of wastewater treatment and reuse was well shown by LCA analysis using the proposed model. 2009 Elsevier Ltd. All rights reserved.
Evaluation of microfinance projects.
Johnson, S
1999-08-01
This paper criticizes the quick system proposed by Henk Moll for evaluating microfinance projects in the article ¿How to Pre-Evaluate Credit Projects in Ten Minutes¿. The author contended that there is a need to emphasize the objectives of the project. The procedure used by Moll, he contended, is applicable only to projects that have only two key objectives, such as credit operations, and the provision of services. Arguments are presented on the three specific questions proposed by Moll, ranging from the availability of externally audited financial reports, the performance of interest rate on loans vis-a-vis the inflation rate, and the provision of loans according to the individual requirements of the borrowers. Lastly, the author emphasizes that the overall approach is not useful and suggests that careful considerations should be observed in the use or abuse of a simple scoring system or checklist such as the one proposed by Moll.
Specific test and evaluation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hays, W.H.
1998-03-20
The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AX-B Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), andmore » Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.« less
Konrad, Christopher P.
2010-01-01
The Nature Conservancy has been working with U.S. Army Corps of Engineers (Corps) through the Sustainable Rivers Project (SRP) to modify operations of dams to achieve ecological objectives in addition to meeting the authorized purposes of the dams. Modifications to dam operations are specified in terms of environmental flow prescriptions that quantify the magnitude, duration, frequency, and seasonal timing of releases to achieve specific ecological outcomes. Outcomes of environmental flow prescriptions implemented from 2002 to 2008 have been monitored and evaluated at demonstration sites in five rivers: Green River, Kentucky; Savannah River, Georgia/South Carolina; Bill Williams River, Arizona; Big Cypress Creek, Texas; and Middle Fork Willamette River, Oregon. Monitoring and evaluation have been accomplished through collaborative partnerships of federal and state agencies, universities, and nongovernmental organizations.
Detailed performance and environmental monitoring of aquifer heating and cooling systems
NASA Astrophysics Data System (ADS)
Acuna, José; Ahlkrona, Malva; Zandin, Hanna; Singh, Ashutosh
2016-04-01
The project intends to quantify the performance and environmental impact of large scale aquifer thermal energy storage, as well as point at recommendations for operating and estimating the environmental footprint of future systems. Field measurements, test of innovative equipment as well as advanced modelling work and analysis will be performed. The following aspects are introduced and covered in the presentation: -Thermal, chemical and microbiological influence of akvifer thermal energy storage systems: measurement and evaluation of real conditions and the influence of one system in operation. -Follow up of energy extraction from aquifer as compared to projected values, recommendations for improvements. -Evaluation of the most used thermal modeling tool for design and calculation of groundwater temperatures, calculations with MODFLOW/MT3DMS -Test and evaluation of optical fiber cables as a way to measure temperatures in aquifer thermal energy storages
Creating Alternative Methods for Educational Evaluation.
ERIC Educational Resources Information Center
Smith, Nick L.
1981-01-01
A project supported by the National Institute of Education is adapting evaluation procedures from such areas as philosophy, geography, operations research, journalism, film criticism, and other areas. The need for such methods is reviewed, as is the context in which they function, and their contributions to evaluation methodology. (Author/GK)
Fleet DNA: Commercial Fleet Vehicle Operating Data | Transportation
and Vehicle Dynamometer Evaluation and Comparison of Class 7 Hybrid Electric and Conventional Diesel Gasoline-Electric Hybrid Transit Buses In-Use Performance Comparison of Hybrid Electric, CNG, and Diesel Diesel Electric Hybrid Tractor Evaluation: 13-Month Final Report Project Startup: Evaluating Coca-Cola's
Wind Tunnel Management and Resource Optimization: A Systems Modeling Approach
NASA Technical Reports Server (NTRS)
Jacobs, Derya, A.; Aasen, Curtis A.
2000-01-01
Time, money, and, personnel are becoming increasingly scarce resources within government agencies due to a reduction in funding and the desire to demonstrate responsible economic efficiency. The ability of an organization to plan and schedule resources effectively can provide the necessary leverage to improve productivity, provide continuous support to all projects, and insure flexibility in a rapidly changing environment. Without adequate internal controls the organization is forced to rely on external support, waste precious resources, and risk an inefficient response to change. Management systems must be developed and applied that strive to maximize the utility of existing resources in order to achieve the goal of "faster, cheaper, better". An area of concern within NASA Langley Research Center was the scheduling, planning, and resource management of the Wind Tunnel Enterprise operations. Nine wind tunnels make up the Enterprise. Prior to this research, these wind tunnel groups did not employ a rigorous or standardized management planning system. In addition, each wind tunnel unit operated from a position of autonomy, with little coordination of clients, resources, or project control. For operating and planning purposes, each wind tunnel operating unit must balance inputs from a variety of sources. Although each unit is managed by individual Facility Operations groups, other stakeholders influence wind tunnel operations. These groups include, for example, the various researchers and clients who use the facility, the Facility System Engineering Division (FSED) tasked with wind tunnel repair and upgrade, the Langley Research Center (LaRC) Fabrication (FAB) group which fabricates repair parts and provides test model upkeep, the NASA and LARC Strategic Plans, and unscheduled use of the facilities by important clients. Expanding these influences horizontally through nine wind tunnel operations and vertically along the NASA management structure greatly increases the complexity of developing a model that can be used for successfully implementing a standardized management planning tool. The objective of this study was to implement an Integrated Wind Tunnel Planning System to improve the operations within the aeronautics testing and research group, in particular Wind Tunnel Enterprise. The study included following steps: Conducted literature search and expert discussions (NASA and Old Dominion University faculty), Performed environmental scan of NASA Langley wind tunnel operations as foundation for problem definition. Established operation requirements and evaluation methodologies. Examined windtunnel operations to map out the common characteristics, critical components, and system structure. Reviewed and evaluated various project scheduling and management systems for implementation, Evaluated and implemented "Theory of Constraints (TOC)" project scheduling methodology at NASA Langley wind tunnel operations together with NASA staff.
ERIC Educational Resources Information Center
Lafferty, Bill R.
The San Antonio Experience-Based Career Education (EBCE) project was evaluated by a third party for its three years of operation. The project was designed to assist youth in making a successful transition to adulthood through community-based and learning center experiences, and was implemented by the Harlandale and San Antonio school districts.…
ERIC Educational Resources Information Center
Stanford, Edward B.
In 1968, a two-year pilot project, called the Minnesota Interlibrary Teletype Experiment (MINITEX) was undertaken to test the feasibility of sharing the University of Minnesota's library resources with patrons of outstate libraries. This report presents the definitive evaluation for the MINITEX project. The four elements in the design of the…
ERIC Educational Resources Information Center
Balatti, Jo; Black, Stephen; Falk, Ian
2009-01-01
The primary purpose of this project is to produce a set of guidelines on how to deliver adult literacy and numeracy education and training using a social capital approach. Social capital in this project refers to the networks that operate during resourcing, course design, recruitment, teaching and evaluation. The study focused on three specific…
ERIC Educational Resources Information Center
Guadalupe, Deana R.
Integrated Methods for Pupils to Reinforce Occupational and Vocational Effectiveness (Project IMPROVE) was a federally funded project in its second year of operation in two Manhattan (New York) high schools in 1992-93. It served limited-English-proficient students, 186 Latino and 13 Asian-American, in grades 9-12. Students received instruction in…
ERIC Educational Resources Information Center
Lynch, Joanne
Cognitive Academic Language Learning Approach (Project CALLA) was a federally funded program serving 960 limited-English-proficient students in 10 Manhattan (New York) elementary schools in 1992-93 its third year of operation. The project provided instruction in English as a Second Language (ESL), mathematics, science, and social studies in…
ERIC Educational Resources Information Center
Appel, Yetta; Berken, Ruth R.
This project for pregnant school age girls is an ESEA Title I program operating in five facilities in Manhattan, Bronx, and Brooklyn. The primary objective of the project was to assist pregnant school age girls complete their education by being able to attend school. Additional objectives included provision of information and training in personal…
FIELD TESTING AND EVALUATION OF ZERPOL® AT PIONEER METAL FINISHING
The project examines the Zerpol® process. The Zerpol® process, as used in metal plating operations, captures all aqueous effluent from the manufacturing operations, conditions the effluent to remove any metal or cyanide that may be present, and permits the reuse of the ...
DOT National Transportation Integrated Search
1997-05-01
The Intelligent Transport Systems (ITS) Operation Test Project was designed to assess the potential of ITS to support cleaner air by providing real-time vehicle tailpipe emissions information (carbon monoxide levels) to the driving public. It made...
Long, H. Keith; Daddow, Richard L.; Farrar, Jerry W.
1998-01-01
Since 1962, the U.S. Geological Survey (USGS) has operated the Standard Reference Sample Project to evaluate the performance of USGS, cooperator, and contractor analytical laboratories that analyze chemical constituents of environmental samples. The laboratories are evaluated by using performance evaluation samples, called Standard Reference Samples (SRSs). SRSs are submitted to laboratories semi-annually for round-robin laboratory performance comparison purposes. Currently, approximately 100 laboratories are evaluated for their analytical performance on six SRSs for inorganic and nutrient constituents. As part of the SRS Project, a surplus of homogeneous, stable SRSs is maintained for purchase by USGS offices and participating laboratories for use in continuing quality-assurance and quality-control activities. Statistical evaluation of the laboratories results provides information to compare the analytical performance of the laboratories and to determine possible analytical deficiences and problems. SRS results also provide information on the bias and variability of different analytical methods used in the SRS analyses.
ERIC Educational Resources Information Center
Duque, Diana L.
This report presents findings of the evaluation by the New York City public school system's Office of Research, Evaluation, and Assessment of three programs (Summer E.S.L. Welcome Plus, Summer Bilingual, and Project Omega) for immigrant students. The Summer E.S.L. (English as a Second Language) Welcome Plus program operated at 19 sites in New York…
1991-02-01
200 words) Aquatic plant control is necessary to maintain the flow of benefits for which water resources projects are constructed and operated (e.g...but little work has been performed by the Corps to evaluate the economic benefits resulting from aquatic plant control programs. This report reviewed...the applicability of the project evaluation guidance, Principles and Guidelines (P&G), for the eval- uation of aquatic plant control benefits . It was
Evaluation of Options for Interpreting Environmental ...
Report Secondary data from the BioResponse Operational Testing and Evaluation project were used to study six options for interpreting culture-based/microbial count data sets that include left censored data, or measurements that are less than established quantification limits and/or detection limits.
DOT National Transportation Integrated Search
2010-04-01
This project provides an independent evaluation of a commercially available low-cost driving behavior management system. Participating drivers from two carriers (identified as Carrier A and Carrier B) drove an instrumented vehicle for 17 consecutive ...
DEVELOPMENT OF THE PRIEST RAPIDS TURBINE UPGRADE PROJECT
DOE Office of Scientific and Technical Information (OSTI.GOV)
DeBolt, Donald; Richmond, Marshall C.; Donelson, Richard K.
The Priest Rapids Dam is located on the Columbia River and is operated by Public Utility District No. 2 of Grant County, WA (GCPUD). In operation since 1959, GCPUD decided that a major upgrade was necessary. As with other hydroelectric facilities on the Columbia River, improving fish passage at Priest Rapids Dam is of great importance for salmon and steelhead populations in the Pacific Northwest. Consequently, GCPUD established the Priest Rapids Turbine Upgrade Project to extend the life of the units, increase efficiency and power production, and improve fish-passage. The Priest Rapids powerhouse is equipped with 10 vertical Kaplan turbinesmore » with runner diameters of 7.21 m operating under net heads varying from 18 m to 27 m. The scope of the project included a design competition involving three turbine manufacturers providing up to two designs for evaluation. Selection of the replacement design was determined by the lowest evaluated price based on model test results conducted at an independent laboratory (Ecole Polytechnique Federale de Lausanne in Lausanne Switzerland) and a biological performance score determined by a newly developed Biological Performance Assessment (BioPA) performed by Pacific Northwest National Laboratory in Richland, WA. In the paper, the hydraulic design challenges are reviewed, in addition to comparisons of designs evaluated during the competitive model test program and biological assessment. The paper also provides a description of the process followed by GCPUD, and how the evaluation criteria influenced the development and the finally selected solution.« less
Optical projectors simulate human eyes to establish operator's field of view
NASA Technical Reports Server (NTRS)
Beam, R. A.
1966-01-01
Device projects visual pattern limits of the field of view of an operator as his eyes are directed at a given point on a control panel. The device, which consists of two projectors, provides instant evaluation of visual ability at a point on a panel.
78 FR 73085 - Mission Compatibility Evaluation Process
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-05
... daily operating hours or the number of days that equipment in the proposed structure would be in use... structure, operating characteristics, or the equipment in the proposed project. (2) Changing the location of... the DoD involve proposals for the construction of structures that may affect navigable air space...
Municipal Sludge Application in Forests of Northern Michigan: a Case Study.
D.G. Brockway; P.V. Nguyen
1986-01-01
A large-scale operational demonstration and research project was cooperatively established by the US. Environmental Protection Agency, Michigan Department of Natural Resources, and Michigan State University to evaluate the practice of forest land application as an option for sludge utilization. Project objectives included completing (1) a logistic and economic...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-17
... project, GSA proposes to relocate its current operations from the Bannister Federal Complex in Kansas City... increment financing (TIF) district, on the East-side of downtown, in Missouri's 5th Congressional District... the proposed project. GSA will also evaluate the ``No Action'' and other reasonable alternatives to...
1984-11-01
FLOW CHART Complet List of Location/Shtes Evaluation of Past Operations at LUste SNMe * ~Potential Hazard to Healh WelareS Reglaor Agencon consolidat...siting studies were also a part of this tions, soil, groundwater sampling and large complex project. analysis, and remedial concept engi- neering. Project
1981-09-15
Organization included radiological safety, security, transportation, cominuni- cations, engineering , and logistics. The Air Force Special Weapons Center (AFSWC...Test Organization by Reynolds Electrical and Engineering Company. Inc. * PLUMBBOB AFSWP Operation Summary Report * Weapons Test Reports for the Armed...Project 50.5 (Evaluation of’ Shielding for Engineer ileavy Equipment) .... ......... . 4.2.4 Project 50.6 (Protection Afforded by "Field
Project TRAIN, 1984-1985. OEA Evaluation Report.
ERIC Educational Resources Information Center
New York City Board of Education, Brooklyn. Office of Educational Assessment.
Project TRAIN, in its first year of operation, proposed to offer 210 parents of New York City high school students of limited English proficiency (LEP) an opportunity to improve their own English language skills. The targeted language groups included Spanish, Haitian Creole, Khmer, and Korean. This was to have been achieved through regularly…
Evaluation of the Bangalore/Madras Communicational Teaching Project.
ERIC Educational Resources Information Center
Beretta, Alan; Davies, Alan
The Bangalore Communicational Teaching Project (CTP) in India operates on the central tenet that in English instruction, form can be acquired through a focus on meaning alone, that a grammatical system can be assimilated unconsciously if the mind is engaged in trying to understand or convey meaning. Linguistic specification is not used in CTP, and…
NASA Technical Reports Server (NTRS)
Aquilina, Rudolph A.
2015-01-01
The SMART-NAS Testbed for Safe Trajectory Based Operations Project will deliver an evaluation capability, critical to the ATM community, allowing full NextGen and beyond-NextGen concepts to be assessed and developed. To meet this objective a strong focus will be placed on concept integration and validation to enable a gate-to-gate trajectory-based system capability that satisfies a full vision for NextGen. The SMART-NAS for Safe TBO Project consists of six sub-projects. Three of the sub-projects are focused on exploring and developing technologies, concepts and models for evolving and transforming air traffic management operations in the ATM+2 time horizon, while the remaining three sub-projects are focused on developing the tools and capabilities needed for testing these advanced concepts. Function Allocation, Networked Air Traffic Management and Trajectory Based Operations are developing concepts and models. SMART-NAS Test-bed, System Assurance Technologies and Real-time Safety Modeling are developing the tools and capabilities to test these concepts. Simulation and modeling capabilities will include the ability to assess multiple operational scenarios of the national airspace system, accept data feeds, allowing shadowing of actual operations in either real-time, fast-time and/or hybrid modes of operations in distributed environments, and enable integrated examinations of concepts, algorithms, technologies, and NAS architectures. An important focus within this project is to enable the development of a real-time, system-wide safety assurance system. The basis of such a system is a continuum of information acquisition, analysis, and assessment that enables awareness and corrective action to detect and mitigate potential threats to continuous system-wide safety at all levels. This process, which currently can only be done post operations, will be driven towards "real-time" assessments in the 2035 time frame.
Medium- and Heavy-Duty Vehicle Field Evaluations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kelly, Kenneth J; Prohaska, Robert S
This presentation provides information about NREL's real-world evaluations of commercial vehicle technologies, which compare the performance of advanced medium- and heavy-duty fleet vehicles to conventional vehicles. NREL conducts these customized evaluations in partnership with commercial and government fleets across the nation. Current fleet and industry partners include UPS, Workhorse, Parker Hannifin, Proterra, Foothill Transit, Long Beach Transit, BYD, Odyne, Duke Energy, Miami-Dade, TransPower, Eaton, Cummins, Bosch, and Clean Cities/National Clean Fleet Partnership. The presentation focuses on two particular vehicle evaluation projects -- hydraulic hybrid refuse haulers operated by Miami-Dade and electric transit buses operated by Foothill Transit.
Integrated Primary Care Teams (IPCT) pilot project in Quebec: a protocol paper
Contandriopoulos, Damien; Duhoux, Arnaud; Roy, Bernard; Amar, Maxime; Bonin, Jean-Pierre; Borges Da Silva, Roxane; Brault, Isabelle; Dallaire, Clémence; Dubois, Carl-Ardy; Girard, Francine; Jean, Emmanuelle; Larue, Caroline; Lessard, Lily; Mathieu, Luc; Pépin, Jacinthe; Cockenpot, Aurore
2015-01-01
Introduction The overall aim of this project is to help develop knowledge about primary care delivery models likely to improve the accessibility, quality and efficiency of care. Operationally, this objective will be achieved through supporting and evaluating 8 primary care team pilot sites that rely on an expanded nursing role within a more intensive team-based, interdisciplinary setting. Methods and analysis The first research component is aimed at supporting the development and implementation of the pilot projects, and is divided into 2 parts. The first part is a logical analysis based on interpreting available scientific data to understand the causal processes by which the objectives of the intervention being studied may be achieved. The second part is a developmental evaluation to support teams in the field in a participatory manner and thereby learn from experience. Operationally, the developmental evaluation phase mainly involves semistructured interviews. The second component of the project design focuses on evaluating pilot project results and assessing their costs. This component is in turn made up of 2 parts. Part 1 is a pre-and-post survey of patients receiving the intervention care to analyse their care experience. In part 2, each patient enrolled in part 1 (around 4000 patients) will be matched with 2 patients followed within a traditional primary care model, so that a comparative analysis of the accessibility, quality and efficiency of the intervention can be performed. The cohorts formed in this way will be followed longitudinally for 4 years. Ethics and dissemination The project, as well as all consent forms and research tools, have been accepted by 2 health sciences research ethics committees. The procedures used will conform to best practices regarding the anonymity of patients. PMID:26700294
NASA Technical Reports Server (NTRS)
Johnson, David W.
1991-01-01
The purpose was to study how manpower and projects are planned at the Facilities Engineering Division (FENGD) within the Systems Engineering and Operations Directorate of the LaRC and to make recommendations for improving the effectiveness and productivity ot the tools that are used. The existing manpower and project planning processes (including the management plan for the FENGD, existing manpower planning reports, project reporting to LaRC and NASA Headquarters, employee time reporting, financial reporting, and coordination/tracking reports for procurement) were discussed with several people, and project planning software was evaluated.
Data Flow in Relation to Life-Cycle Costing of Construction Projects in the Czech Republic
NASA Astrophysics Data System (ADS)
Biolek, Vojtěch; Hanák, Tomáš; Marović, Ivan
2017-10-01
Life-cycle costing is an important part of every construction project, as it makes it possible to take into consideration future costs relating to the operation and demolition phase of a built structure. In this way, investors can optimize the project design to minimize the total project costs. Even though there have already been some attempts to implement BIM software in the Czech Republic, the current state of affairs does not support automated data flow between the bill of costs and applications that support building facility management. The main aim of this study is to critically evaluate the current situation and outline a future framework that should allow for the use of the data contained in the bill of costs to manage building operating costs.
NASA Astrophysics Data System (ADS)
Benveniste, J.; Cotton, D.; Moreau, T.; Raynal, M.; Varona, E.; Cipollini, P.; Cancet, M.; Martin, F.; Fenoglio-Marc, L.; Naeije, M.; Fernandes, J.; Lazaro, C.; Restano, M.; Ambrózio, A.
2017-12-01
The ESA Sentinel-3 satellite, launched in February 2016 as a part of the Copernicus programme, is the second satellite to operate a SAR mode altimeter. The Sentinel 3 Synthetic Aperture Radar Altimeter (SRAL) is based on the heritage from Cryosat-2, but this time complemented by a Microwave Radiometer (MWR) to provide a wet troposphere correction, and operating at Ku and C-Bands to provide an accurate along-track ionospheric correction. The SRAL is operated in SAR mode over the whole ocean and promises increased performance w.r.t. conventional altimetry. SCOOP (SAR Altimetry Coastal & Open Ocean Performance) is a project funded under the ESA SEOM (Scientific Exploitation of Operational Missions) Programme Element, started in September 2015, to characterise the expected performance of Sentinel-3 SRAL SAR mode altimeter products, in the coastal zone and open-ocean, and then to develop and evaluate enhancements to the baseline processing scheme in terms of improvements to ocean measurements. There is also a work package to develop and evaluate an improved Wet Troposphere correction for Sentinel-3, based on the measurements from the on-board MWR, further enhanced mostly in the coastal and polar regions using third party data, and provide recommendations for use. In this presentation we present results from the SCOOP project that demonstrate the excellent performance of SRAL in terms of measurement precision, and we illustrate the development and testing of new processing approaches designed specifically to improve performance close to the coast. The SCOOP test data sets and relevant documentation are available to external researchers on application to the project team. At the end of the project recommendations for further developments and implementations will be provided through a scientific roadmap.
Sensing Hazards with Operational Unmanned Technology
NASA Astrophysics Data System (ADS)
Hood, R. E.
2016-12-01
The Unmanned Aircraft Systems (UAS) Program of the National Oceanic and Atmospheric Administration (NOAA) is working with the National Weather Service, the National Ocean Service, other Federal agencies, private industry, and academia to evaluate the feasibility of UAS observations to provide time critical information needed for situational awareness, prediction, warning, and damage assessment of hazards. This activity is managed within a portfolio of projects entitled "Sensing Hazards with Operational Unmanned Technology (SHOUT)." The diversity of this portfolio includes evaluations of high altitude UAS observations for high impact oceanic storms prediction to low altitude UAS observations of rivers, severe storms, and coastal areas for pre-hazard situational awareness and post-hazard damage assessments. Each SHOUT evaluation project begins with a proof-of-concept field demonstration of a UAS observing strategy for a given hazard and then matures to joint studies of both scientific data impact along with cost and operational feasibility of the observing strategy for routine applications. The technology readiness and preliminary evaulation results will be presented for several UAS observing strategies designed for improved observations of oceanic storms, floods, severe storms, and coastal ecosystem hazards.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Deforest, Thomas J.; VanDyke, Damon S.
2012-03-01
Operational Testing and Evaluation Plan - Kingston Container Terminal, Port of Kingston, Jamaica was written for the Second Line of Defense Megaports Initiative. The purpose of the Operational Testing and Evaluation (OT&E) phase of the project is to prepare for turnover of the Megaports system supplied by U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA) located at the Kingston Container Terminal (KCT) of the Port of Kingston, Jamaica to the Government of Jamaica (GOJ). Activities conducted during the OT&E phase must demonstrate that the Megaports system can be operated effectively in real time by Jamaica Customs and KCT personnel tomore » the satisfaction of the DOE/NNSA. These activities will also determine if the Megaports system, as installed and accepted, is performing according to the Megaports Program objectives such that the system is capable of executing the mission of the Second Line of Defense Megaports Initiative. The OT&E phase of the project also provides an opportunity to consider potential improvements to the system and to take remedial action if performance deficiencies are identified during the course of evaluation. Changes to the system should be considered under an appropriate change-control process. DOE/NNSA will determine that OT&E is complete by examining whether the Megaports system is performing as intended and that the GOJ is fully capable of operating the system independently without continued onsite support from the U.S. team.« less
Arroyo-Johnson, Cassandra; Allen, Michele L.; Colditz, Graham A.; Hurtado, G. Ali; Davey, Cynthia S.; Sanders Thompson, Vetta L.; Drake, Bettina F.; Svetaz, Maria Veronica; Rosas-Lee, Maira; Goodman, Melody S.
2016-01-01
Background Community Networks Program (CNP) centers are required to use a community-based participatory research (CBPR) approach within their specific priority communities. Not all communities are the same and unique contextual factors and collaborators’ priorities shape each CBPR partnership. There are also established CBPR and community engagement (CE) principles shown to lead to quality CBPR in any community. However, operationalizing and assessing CBPR principles and partnership outcomes to understand the conditions and processes in CBPR that lead to achieving program and project level goals is relatively new in the science of CBPR. Objectives We sought to describe the development of surveys on adherence to and implementation of CBPR/CE principles at two CNP centers and examine commonalities and differences in program- versus project-level CBPR evaluation. Methods A case study about the development and application of CBPR/CE principles for the Missouri CNP, Program for the Elimination of Cancer Disparities, and Minnesota CNP, Padres Informados/Jovenes Preparados, surveys was conducted to compare project versus program operationalization of principles. Survey participant demographics were provided by CNP. Specific domains found in CBPR/CE principles were identified and organized under an existing framework to establish a common ground. Operational definitions and the number of survey items were provided for each domain by CNP. Conclusion There are distinct differences in operational definitions of CBPR/CE principles at the program and project levels of evaluation. However, commonalities support further research to develop standards for CBPR evaluation across partnerships and at the program and project levels. PMID:26213405
DOT National Transportation Integrated Search
2000-07-01
This report presents the results of a one-year evaluation test of an Intelligent Transportation Systems (ITS) project known as Advanced Rural Transportation Information and Coordination (ARTIC), located in the Arrowhead Region of Northeastern Minneso...
Evaluation of lower BAC limits for convicted OUI offenders in Maine
DOT National Transportation Integrated Search
2004-12-01
This is the final report of a project evaluating the effectiveness of a lower blood alcohol concentration (BAC) limit for drivers convicted of operating under the influence of intoxicants (OUI) in Maine. The law made it illegal for an OUI offender to...
Dynamic systems and the role of evaluation: The case of the Green Communities project.
Anzoise, Valentina; Sardo, Stefania
2016-02-01
The crucial role evaluation can play in the co-development of project design and its implementation will be addressed through the analysis of a case study, the Green Communities (GC) project, funded by the Italian Ministry of Environment within the EU Interregional Operational Program (2007-2013) "Renewable Energy and Energy Efficiency". The project's broader goals included an attempt to trigger a change in Italian local development strategies, especially for mountain and inland areas, which would be tailored to the real needs of communities, and based on a sustainable exploitation and management of the territorial assets. The goal was not achieved, and this paper addresses the issues of how GC could have been more effective in fostering a vision of change, and which design adaptations and evaluation procedures would have allowed the project to better cope with the unexpected consequences and resistances it encountered. The conclusions drawn are that projects should be conceived, designed and carried out as dynamic systems, inclusive of a dynamic and engaged evaluation enabling the generation of feedbacks loops, iteratively interpreting the narratives and dynamics unfolding within the project, and actively monitoring the potential of various relationships among project participants for generating positive social change. Copyright © 2015 Elsevier Ltd. All rights reserved.
NASA Technical Reports Server (NTRS)
Grindle, Laurie; Sakahara, Robert; Hackenberg, Davis; Johnson, William
2017-01-01
The topics discussed are the UAS-NAS project life-cycle and ARMD thrust flow down, as well as the UAS environments and how we operate in those environments. NASA's Armstrong Flight Research Center at Edwards, CA, is leading a project designed to help integrate unmanned air vehicles into the world around us. The Unmanned Aircraft Systems Integration in the National Airspace System project, or UAS in the NAS, will contribute capabilities designed to reduce technical barriers related to safety and operational challenges associated with enabling routine UAS access to the NAS. The project falls under the Integrated Systems Research Program office managed at NASA Headquarters by the agency's Aeronautics Research Mission Directorate. NASA's four aeronautics research centers - Armstrong, Ames Research Center, Langley Research Center, and Glenn Research Center - are part of the technology development project. With the use and diversity of unmanned aircraft growing rapidly, new uses for these vehicles are constantly being considered. Unmanned aircraft promise new ways of increasing efficiency, reducing costs, enhancing safety and saving lives 460265main_ED10-0132-16_full.jpg Unmanned aircraft systems such as NASA's Global Hawks (above) and Predator B named Ikhana (below), along with numerous other unmanned aircraft systems large and small, are the prime focus of the UAS in the NAS effort to integrate them into the national airspace. Credits: NASA Photos 710580main_ED07-0243-37_full.jpg The UAS in the NAS project envisions performance-based routine access to all segments of the national airspace for all unmanned aircraft system classes, once all safety-related and technical barriers are overcome. The project will provide critical data to such key stakeholders and customers as the Federal Aviation Administration and RTCA Special Committee 203 (formerly the Radio Technical Commission for Aeronautics) by conducting integrated, relevant system-level tests to adequately address safety and operational challenges of national airspace access by unmanned aircraft systems, or UAS. In the process, the project will work with other key stakeholders to define necessary deliverables and products to help enable such access. Within the project, NASA is focusing on five sub-projects. These five focus areas include assurance of safe separation of unmanned aircraft from manned aircraft when flying in the national airspace; safety-critical command and control systems and radio frequencies to enable safe operation of UAS; human factors issues for ground control stations; airworthiness certification standards for UAS avionics and integrated tests and evaluation designed to determine the viability of emerging UAS technology. Five Focus Areas of the UAS Integration in the NAS Project Separation Assurance Provide an assessment of how planned Next Generation Air Transportation System (NextGen) separation assurance systems, with different functional allocations, perform for UAS in mixed operations with manned aircraft Assess the applicability to UAS and the performance of NASA NextGen separation assurance systems in flight tests with realistic latencies and uncertain trajectories Assess functional allocations ranging from today's ground-based, controller-provided aircraft separation to fully autonomous airborne self-separation Communications Develop data and rationale to obtain appropriate frequency spectrum allocations to enable safe and efficient operation of UAS in the NAS Develop and validate candidate secure safety-critical command and control system/subsystem test equipment for UAS that complies with UAS international/national frequency regulations, standards and recommended practices and minimum operational and aviation system performance standards for UAS Perform analysis to support recommendations for integration of safety-critical command and control systems and air traffic control communications to ensure safe and efficient operation of UAS in the NAS Human Systems Integration Develop a research test bed and database to provide data and proof of concept for GCS - ground control station - operations in the NAS Coordinate with standards organizations to develop human-factors guidelines for GCS operation in the NAS Certification Define a UAS classification scheme and approach to determining Federal Aviation Regulation airworthiness requirements applicable to all UAS digital avionics Provide hazard and risk-related data to support development of type design criteria and best development practices Integrated Tests and Evaluation Integrate and test mature concepts from technical elements to demonstrate and test viability Evaluate the performance of technology development in a relevant environment (full-mission, human-in-the-loop simulations and flight tests)
NASA Astrophysics Data System (ADS)
Anderson, Stan L.; Fero, Arnold H.; Roberts, George K.
2003-06-01
The neutron fluence associated with each material in the pressure vessel beltline region is determined on a plant specific basis at each surveillance capsule withdrawal. Based on an assumed mode of operation, fluence projections to account for future operation are then made for use in vessel integrity evaluations. The applicability of these assumed projections is normally verified and updated, if necessary, at each subsequent surveillance capsule withdrawal. However, following the last scheduled withdrawal of a surveillance capsule, there is generally no formal mechanism in place to assure that fluence projections for the remainder of plant operating lifetime remain valid. This paper provides a review of a methodology that can be efficiently used in conjunction with future fuel loading patterns or on-line core power distribution monitoring systems to track the actual fluence accrued by each of the pressure vessel beltline materials in the operating period following the last capsule withdrawal.
NASA Technical Reports Server (NTRS)
Verma, Savita Arora; Jung, Yoon Chul
2017-01-01
This presentation describes the overview of the ATD-2 project and the integrated simulation of surface and airspace to evaluate the procedures of IADS system and evaluate surface metering capabilities via a high-fidelity human-in-the-loop simulation. Two HITL facilities, Future Flight Central (FFC) and Airspace Operations Laboratory (AOL), are integrated for simulating surface operations of the Charlotte-Douglas International Airport (CLT) and airspace in CLT TRACON and Washington Center.
De Clercq, Djavan; Wen, Zongguo; Fan, Fei
2017-03-15
The objective of this research was to conduct a performance evaluation of three food waste/biowaste-to-biogas pilot projects across 7 scenarios in China based on multi-criteria decision analysis (MCDA) methodology. The projects ranked included a food waste-biogas project in Beijing, a food waste-biogas project in Suzhou and a co-digestion project producing biomethane in Hainan. The projects were ranked from best to worst based on technical, economic and environmental criteria under the MCDA framework. The results demonstrated that some projects are encountering operational problems. Based on these findings, six national policy recommendations were provided: (1) shift away from capital investment subsidies to performance-based subsidies; (2) re-design feed in tariffs; (3) promote bio-methane and project clustering; (4) improve collection efficiency by incentivizing FW producers to direct waste to biogas projects; (5) incentivize biogas projects to produce multiple outputs; (6) incentivize food waste-based projects to co-digest food waste with other substrates for higher gas output. Copyright © 2016 Elsevier Ltd. All rights reserved.
Use of meteorological satellite observations in weather modification programs
NASA Technical Reports Server (NTRS)
Dennis, A. S.; Smith, P. L., Jr.; Biswas, K. R.
1973-01-01
The potential value of weather satellite data in field operations of weather modification is appraised. It was found that satellites could play a useful role in operational weather modification projects, particularly in the recognition of treatment opportunities. Satellite cloud photographs and infrared observations appear promising in the identification of treatment opportunities in seeding orographic cloud systems for increased snowpack, in seeding convective clouds for increased rainfall, in identifying hail threats, and in tracking and observing hurricanes as an aid to timing and location of seeding treatments. It was concluded that the potential value of satellite data in the treatment and evaluation phases of operational projects is not as great as in the recognition of treatment opportunity.
Wind Plant Performance Prediction (WP3) Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Craig, Anna
The methods for analysis of operational wind plant data are highly variable across the wind industry, leading to high uncertainties in the validation and bias-correction of preconstruction energy estimation methods. Lack of credibility in the preconstruction energy estimates leads to significant impacts on project financing and therefore the final levelized cost of energy for the plant. In this work, the variation in the evaluation of a wind plant's operational energy production as a result of variations in the processing methods applied to the operational data is examined. Preliminary results indicate that selection of the filters applied to the data andmore » the filter parameters can have significant impacts in the final computed assessment metrics.« less
King County Metro Battery Electric Bus Demonstration: Preliminary Project Results
DOE Office of Scientific and Technical Information (OSTI.GOV)
The U.S. Federal Transit Administration (FTA) funds a variety of research projects that support the commercialization of zero-emission bus technology. To evaluate projects funded through these programs, FTA has enlisted the help of the National Renewable Energy Laboratory (NREL) to conduct third-party evaluations of the technologies deployed under the FTA programs. NREL works with the selected agencies to evaluate the performance of the zero-emission buses compared to baseline conventional buses in similar service. The evaluation effort will advance the knowledge base of zero-emission technologies in transit bus applications and provide 'lessons learned' to aid other fleets in incrementally introducing nextmore » generation zero-emission buses into their operations. This report provides preliminary performance evaluation results from a demonstration of three zero-emission battery electric buses at King County Metro in King County, Washington. NREL developed this preliminary results report to quickly disseminate evaluation results to stakeholders. Detailed evaluation results will be published in future reports.« less
Network Virtualization - Opportunities and Challenges for Operators
NASA Astrophysics Data System (ADS)
Carapinha, Jorge; Feil, Peter; Weissmann, Paul; Thorsteinsson, Saemundur E.; Etemoğlu, Çağrı; Ingþórsson, Ólafur; Çiftçi, Selami; Melo, Márcio
In the last few years, the concept of network virtualization has gained a lot of attention both from industry and research projects. This paper evaluates the potential of network virtualization from an operator's perspective, with the short-term goal of optimizing service delivery and rollout, and on a longer term as an enabler of technology integration and migration. Based on possible scenarios for implementing and using network virtualization, new business roles and models are examined. Open issues and topics for further evaluation are identified. In summary, the objective is to identify the challenges but also new opportunities for telecom operators raised by network virtualization.
A methodological and operative framework for the evaluation of an e-health project.
Buccoliero, Luca; Calciolari, Stefano; Marsilio, Marta
2008-01-01
Assessing public sector ICT investments represents the premise for successful implementation of an e-health strategy. The recent literature stresses the importance of going beyond the mere financial and/or technical dimensions of the analysis. Consequently, the paper proposes an example of e-health project evaluation aiming to develop measures which get close to the notion of benefits to the different stakeholders involved: top management, patients, local community. The case study refers to an Italian health care organization that implemented a project of digitalization of its clinical reports production few years ago. Based on on-field research, different approaches are used to assess costs and benefits from different stakeholders' perspectives. The results of a multidimensional evaluation are reported to emphasize the need for different measures to assess the sustainability of an e-health project according to the financial convenience, the social role of the organization, and the contingent situation.
DOT National Transportation Integrated Search
2016-11-01
The Federal Motor Carrier Safety Administration (FMCSA) established the FAST DASH program to perform efficient independent evaluations of promising safety technologies aimed at commercial vehicle operations. In this second FAST DASH safety technology...
DOT National Transportation Integrated Search
2004-06-01
The objective of this project is to use the existing data, surveillance and communications infrastructure (to the extent possible) to : develop two case study evaluations for Oregon, including an evaluation of the COMET incident management program an...
PERFORMANCE EVALUATION AT A LONG-TERM FOOD PROCESSING LAND TREATMENT SITE
The objective of this project was to determine the performance of a full scale, operating overland flow land (GEL) treatment system treating nonhazardous waste. Performance was evaluated in terms of treatment of the applied waste and the environmental impact of the system, partic...
Life Cycle Energy Analysis of Reclaimed Water Reuse Projects in Beijing.
Fan, Yupeng; Guo, Erhui; Zhai, Yuanzheng; Chang, Andrew C; Qiao, Qi; Kang, Peng
2018-01-01
To illustrate the benefits of water reuse project, the process-based life cycle analysis (LCA) could be combined with input-output LCA to evaluate the water reuse project. Energy is the only evaluation parameter used in this study. Life cycle assessment of all energy inputs (LCEA) is completed mainly by the life cycle inventory (LCI), taking into account the full life cycle including the construction, the operation, and the demolition phase of the project. Assessment of benefit from water reuse during the life cycle should focus on wastewater discharge reduction and water-saving benefits. The results of LCEA of Beijing water reuse project built in 2014 in a comprehensive way shows that the benefits obtained from the reclaimed water reuse far exceed the life cycle energy consumption. In this paper, the authors apply the LCEA model to estimate the benefits of reclaimed water reuse projects quantitatively.
Raskob, Wolfgang; Schneider, Thierry; Gering, Florian; Charron, Sylvie; Zhelezniak, Mark; Andronopoulos, Spyros; Heriard-Dubreuil, Gilles; Camps, Johan
2015-04-01
The PREPARE project that started in February 2013 and will end at the beginning of 2016 aims to close gaps that have been identified in nuclear and radiological preparedness in Europe following the first evaluation of the Fukushima disaster. Among others, the project will address the review of existing operational procedures for dealing with long-lasting releases and cross-border problems in radiation monitoring and food safety and further develop missing functionalities in decision support systems (DSS) ranging from improved source-term estimation and dispersion modelling to the inclusion of hydrological pathways for European water bodies. In addition, a so-called Analytical Platform will be developed exploring the scientific and operational means to improve information collection, information exchange and the evaluation of such types of disasters. The tools developed within the project will be partly integrated into the two DSS ARGOS and RODOS. © The Author 2014. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.
NASA Technical Reports Server (NTRS)
Stevens, Lindsay; Martin, Lynne; Jobe, Kimberly; Parke, Bonny; Chevalley, Eric; Lee, Hanbong; Verma, Savita; Dulchinos, Victoria
2017-01-01
NASA is collaborating with the Federal Aviation Administration (FAA) and aviation industry partners to develop and demonstrate new concepts and technologies for Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. One of the goals of the IADS capabilities in the ATD-2 project is to increase predictability and throughput of airspace operations by improving Traffic Management Initiative (TMI) compliance. This paper focuses on the Approval Request (APREQ) procedures developed for the ATD-2 project between the Air Traffic Control (ATC) Tower at Charlotte Douglas International Airport and Washington Center. In March 2017, NASA conducted a Human-in-the-Loop (HITL) simulation to evaluate the operational procedures and information requirements for the APREQ procedures in the ATD-2 IADS system between ATC Tower and Center. The findings from the HITL are used to compare ATD-2 APREQ procedures with information about current day APREQ procedures.
NASA Technical Reports Server (NTRS)
Stevens, Lindsay; Martin, Lynne; Jobe, Kimberly; Parke, Bonny; Chevalley, Eric; Lee, Hanbong; Verma, Savita; Dulchinos, Victoria
2017-01-01
NASA is collaborating with the Federal Aviation Administration (FAA) and aviation industry partners to develop and demonstrate new concepts and technologies for Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. One of the goals of the IADS capabilities in the ATD-2 project is to increase predictability and throughput of airspace operations by improving Traffic Management Initiative (TMI) compliance. This paper focuses on the Approval Request (APREQ) procedures developed for the ATD-2 project between the Air Traffic Control (ATC) Tower at Charlotte Douglas International Airport and Washington Center. In March 2017, NASA conducted a Human-in-the-Loop (HITL) simulation to evaluate the operational procedures and information requirements for the APREQ procedures in the ATD-2 IADS system between ATC Tower and Center. The findings from the HITL are used to compare ATD-2 APREQ procedures with information about current day APREQ procedures.
DOT National Transportation Integrated Search
1997-07-01
This report is the culmination of the first task in a project to evaluate human factors and operations issues associated : with the integration of Class C Global Positioning System (GPS) sensors and Class Beta GPS/Wide Area Augmentation System : (WAA...
ERIC Educational Resources Information Center
Cook, John T.; Ohri-Vachaspati, Punam; Kelly, Gayle Leitch
In early 1994, Central Falls, Rhode Island's Kids First, a collaborative partnership between the Central Falls School Department and local community leaders, launched a pilot universally-free school breakfast program (UF-SBP) called "Operation Breakfast." One of the goals of Operation Breakfast was to improve SBP participation; school…
Smith and Navistar Electric and Plug-In Hybrid Vehicle Testing |
plug-in hybrid electric vehicles operated by a variety of companies in diverse climates across the plug-in hybrid electric drive systems in medium-duty trucks operating in fleet service across the nation. U.S. companies agreeing to participate in this evaluation project received funding from the
DOT National Transportation Integrated Search
1999-01-01
In 1997, the Ann Arbor (Michigan) Transportation Authority began deploying advanced public transportation systems (APTS) technologies in its fixed route and paratransit operations. The project's concept is the integration of a range of such technolog...
DOT National Transportation Integrated Search
1999-01-01
In 1997, the Ann Arbor (Michigan) Transportation Authority (AATA) began deploying advanced public transportation systems (APTS) technologies in its fixed route and paratransit operations. The project's concept is the integration of a range of such te...
DOT National Transportation Integrated Search
1997-07-01
This report is the culmination of the first task in a project to evaluate human factors and operations issues associated with the integration of Class C Global Positioning System (GPS) sensors and Class Beta GPS/Wide Area Augmentation System (WAAS) s...
A Quality Assurance Project Plan (QAPP) was prepared to document the primary objectives and data collection and interpretation efforts for two landfill bioreactor studies at the Outer Loop Landfill in Louisville, KY, operated by Waste Management, Inc. WMI). The two multi-year stu...
The Health Clinic. School of the Future: Houston.
ERIC Educational Resources Information Center
Iscoe, Louise
The Hogg Foundation for Mental Health created the School of the Future (SoF) project to enable selected Texas schools to coordinate and implement school-based social and health services on their campuses and to demonstrate the effectiveness of this method of service delivery by evaluating the project. SoF operated in four urban sites in Texas,…
ERIC Educational Resources Information Center
Coughlan, Tony; Perryman, Leigh-Anne
2015-01-01
Open educational resources and open educational practices are being increasingly used around the globe to train and support professionals in areas where funding and resources are scarce. This paper evaluates the open educational practices (OEP) of three global health projects operating outside academia--the International Association for Child and…
ERIC Educational Resources Information Center
New York City Board of Education, Brooklyn, NY. Office of Research, Evaluation, and Assessment.
Learning Through Automotive Electronics (Project LETAE) was a federally funded program serving 77 limited-English-proficient (LEP) students and 5 English-proficient students in an automotive computer electronics course in 1992-93, its third year of operation. The program provided instruction in English-as-a-Second-Language (ESL), native language…
ERIC Educational Resources Information Center
Duque, Diana L.
The Capacity Building Special Alternatives Program, an Elementary and Secondary Education Act Title VII-funded project in its second year of operation, functioned at seven schools in a community school district of Manhattan (New York). The project served 195 students of limited English proficiency (LEP) whose native languages were Albanian,…
NASA Astrophysics Data System (ADS)
Du, Xiaorong
2017-04-01
Water is the basic condition for human survival and development. As China is the most populous country, rural drinking water safety problems are most conspicuous. Therefore, the Chinese government keeps increasing investment and has built a large number of rural drinking water safety projects. Scientific evaluation of project performance is of great significance to promote the sustainable operation of the project and the sustainable development of rural economy. Previous studies mainly focus on the economic benefits of the project, while ignoring the fact that the rural drinking water safety project is quasi-public goods, which has economic, social and ecological benefits. This paper establishes a comprehensive evaluation model for rural drinking water safety performance, which adapts the rules of "5E" (economy, efficiency, effectiveness, equity and environment) as the value orientation, and selects a rural drinking water safety project as object in case study at K District, which is in the north of Jiangsu Province, China. The results shows: 1) the comprehensive performance of K project is in good condition; 2) The performance of every part shows that the scores of criteria "efficiency", "environment" and "effect" are higher than the mean performance, while the "economy" is slightly lower than the mean and the "equity" is the lowest. 3) The performance of indicator layer shows that: the planned completion rate of project, the reduction rate of project cost and the penetration rate of water-use population are significantly lower than other indicators. Based on the achievements of previous studies and the characteristics of rural drinking water safety project, this study integrates the evaluation dimensions of equity and environment, which can contribute to a more comprehensive and systematic assessment of project performance and provide empirical data for performance evaluation and management of rural drinking water safety project. Key Words: Rural drinking water safety project; Performance evaluation; 5E rules; Comprehensive evaluation model
A Model for Post Hoc Evaluation.
ERIC Educational Resources Information Center
Theimer, William C., Jr.
Often a research department in a school system is called on to make an after the fact evaluation of a program or project. Although the department is operating under a handicap, it can still provide some data useful for evaluative purposes. It is suggested that all the classical methods of descriptive statistics be brought into play. The use of…
Mark 4A project training evaluation
NASA Technical Reports Server (NTRS)
Stephenson, S. N.
1985-01-01
A participant evaluation of a Deep Space Network (DSN) is described. The Mark IVA project is an implementation to upgrade the tracking and data acquisition systems of the dSN. Approximately six hundred DSN operations and engineering maintenance personnel were surveyed. The survey obtained a convenience sample including trained people within the population in order to learn what training had taken place and to what effect. The survey questionnaire used modifications of standard rating scales to evaluate over one hundred items in four training dimensions. The scope of the evaluation included Mark IVA vendor training, a systems familiarization training seminar, engineering training classes, a on-the-job training. Measures of central tendency were made from participant rating responses. Chi square tests of statistical significance were performed on the data. The evaluation results indicated that the effects of different Mark INA training methods could be measured according to certain ratings of technical training effectiveness, and that the Mark IVA technical training has exhibited positive effects on the abilities of DSN personnel to operate and maintain new Mark IVA equipment systems.
Umatilla Basin Natural Production Monitoring and Evaluation; 2003-2004 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schwartz, Jesse D.M.; Contor, Craig C.; Hoverson, Eric
2005-10-01
The Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPMEP) is funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P. L. 96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). UBNPMEP is coordinated with two ODFW research projects that also monitor and evaluatemore » the success of the Umatilla Fisheries Restoration Plan. Our project deals with the natural production component of the plan, and the ODFW projects evaluate hatchery operations (project No. 19000500, Umatilla Hatchery M & E) and smolt outmigration (project No. 198902401, Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River). Collectively these three projects comprehensively monitor and evaluate natural and hatchery salmonid production in the Umatilla River Basin. Table 1 outlines relationships with other BPA supported projects. The need for natural production monitoring has been identified in multiple planning documents including Wy-Kan-Ush-Mi Wa-Kish-Wit Volume I, 5b-13 (CRITFC 1996), the Umatilla Hatchery Master Plan (CTUIR & ODFW 1990), the Umatilla Basin Annual Operation Plan (ODFW and CTUIR 2004), the Umatilla Subbasin Summary (CTUIR & ODFW 2001), the Subbasin Plan (CTUIR & ODFW 2004), and the Comprehensive Research, Monitoring, and Evaluation Plan (Schwartz & Cameron Under Revision). Natural production monitoring and evaluation is also consistent with Section III, Basinwide Provisions, Strategy 9 of the 2000 Columbia River Basin Fish and Wildlife Program (NPPC 1994, NPPC 2004). The need for monitoring the natural production of salmonids in the Umatilla River Basin developed with the efforts to restore natural populations of spring and fall Chinook salmon, (Oncorhynchus tshawytsha) coho salmon and (O. kisutch) and enhance summer steelhead (O. mykiss). The need for restoration began with agricultural development in the early 1900's that extirpated salmon and reduced steelhead runs (BOR 1988). The most notable development was the construction and operation of Three-Mile Falls Dam (3MD) and other irrigation projects that dewatered the Umatilla River during salmon migrations. The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and the Oregon Department of Fish and Wildlife (ODFW) developed the Umatilla Hatchery Master Plan to restore the historical fisheries in the basin. The plan was completed in 1990 and included the following objectives: (1) Establish hatchery and natural runs of Chinook and coho salmon. (2) Enhance existing summer steelhead populations through a hatchery program. (3) Provide sustainable tribal and non-tribal harvest of salmon and steelhead. (4) Maintain the genetic characteristics of salmonids in the Umatilla River Basin. (5) Produce almost 48,000 adult returns to Three-Mile Falls Dam. The goals were reviewed in 1999 and were changed to 31,500 adult salmon and steelhead returns (Table 2). We conduct core long-term monitoring activities each year as well as two and three-year projects that address special needs for adaptive management. Examples of these projects include adult passage evaluations (Contor et al. 1995, Contor et al. 1996, Contor et al. 1997, Contor et al. 1998), genetic monitoring (Currens & Schreck 1995, Narum et al. 2004), and habitat assessment surveys (Contor et al. 1995, Contor et al. 1996, Contor et al. 1997, Contor et al. 1998). Our project goal is to provide quality information to managers and researchers working to restore anadromous salmonids to the Umatilla River Basin. This is the only project that monitors the restoration of naturally producing salmon and steelhead in the basin.« less
The use of UNIX in a real-time environment
NASA Technical Reports Server (NTRS)
Luken, R. D.; Simons, P. C.
1986-01-01
This paper describes a project to evaluate the feasibility of using commercial off-the-shelf hardware and the UNIX operating system, to implement a real-time control and monitor system. A functional subset of the Checkout, Control and Monitor System was chosen as the test bed for the project. The project consists of three separate architecture implementations: a local area bus network, a star network, and a central host. The motivation for this project stemmed from the need to find a way to implement real-time systems, without the cost burden of developing and maintaining custom hardware and unique software. This has always been accepted as the only option because of the need to optimize the implementation for performance. However, with the cost/performance of today's hardware, the inefficiencies of high-level languages and portable operating systems can be effectively overcome.
Okeibunor, Joseph; Bump, Jesse; Zouré, Honorat G M; Sékétéli, Azodoga; Godin, Christine; Amazigo, Uche V
2012-01-01
Onchocerciasis is controlled by mass treatment of at-risk populations with ivermectin. Ivermectin is delivered through community-directed treatment (CDTI) approach. A model has been developed to evaluate the sustainability of the approach and has been tested at 35 projects in 10 countries of the African Program for Onchocerciasis Control (APOC). It incorporates quantitative and qualitative data collection and analysis, taking account of two factors identified as crucial to project sustainability. These are (i) the provision of project performance information to partners, and (ii) evidence-based support for project implementation. The model is designed to provide critical indicators of project performance of the model to implementing, coordinating, and funding partners. The model's participatory and flexible nature makes it culturally sensitive and usable by project management. This model is able to analyze the different levels involved in project implementation and arrive at a judgment for the whole project. It has inbuilt mechanisms for ensuring data reliability and validity. The model addresses the complex issue of sustainability with a cross-sectional design focusing on how and at which operational level of implementation to strengthen a CDTI project. The unique attributes and limitations of the model for evaluating the sustainability of projects were described. Copyright © 2012 John Wiley & Sons, Ltd.
NASA Astrophysics Data System (ADS)
Pytharoulis, Ioannis; Tegoulias, Ioannis; Karacostas, Theodore; Kotsopoulos, Stylianos; Kartsios, Stergios; Bampzelis, Dimitrios
2015-04-01
The Thessaly plain, which is located in central Greece, has a vital role in the financial life of the country, because of its significant agricultural production. The aim of DAPHNE project (http://www.daphne-meteo.gr) is to tackle the problem of drought in this area by means of Weather Modification in convective clouds. This problem is reinforced by the increase of population and the water demand for irrigation, especially during the warm period of the year. The nonhydrostatic Weather Research and Forecasting model (WRF), is utilized for research and operational purposes of DAPHNE project. The WRF output fields are employed by the partners in order to provide high-resolution meteorological guidance and plan the project's operations. The model domains cover: i) Europe, the Mediterranean sea and northern Africa, ii) Greece and iii) the wider region of Thessaly (at selected periods), at horizontal grid-spacings of 15km, 5km and 1km, respectively, using 2-way telescoping nesting. The aim of this research work is to investigate the model performance in relation to the prevailing upper-air synoptic circulation. The statistical evaluation of the high-resolution operational forecasts of near-surface and upper air fields is performed at a selected period of the operational phase of the project using surface observations, gridded fields and weather radar data. The verification is based on gridded, point and object oriented techniques. The 10 upper-air circulation types, which describe the prevailing conditions over Greece, are employed in the synoptic classification. This methodology allows the identification of model errors that occur and/or are maximized at specific synoptic conditions and may otherwise be obscured in aggregate statistics. Preliminary analysis indicates that the largest errors are associated with cyclonic conditions. Acknowledgments This research work of Daphne project (11SYN_8_1088) is co-funded by the European Union (European Regional Development Fund) and Greek national funds, through the action "COOPERATION 2011: Partnerships of Production and Research Institutions in Focused Research and Technology Sectors" in the framework of the Operational Programme "Competitiveness and Entrepreneurship" and Regions in Transition (OPC II, NSRF 2007-2013).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Roberts, Bryan W.
2012-08-23
The Office of the Second Line of Defense (SLD) Megaports project team for Argentina will conduct operational testing and evaluation (OT&E) at Exolgan Container Terminal at the Port of Dock Sud from July 16-20, 2012; and at the Port of Buenos Aires from September 3-7, 2012. SLD is installing radiation detection equipment to screen export, import, and transshipment containers at these locations. The purpose of OT&E is to validate and baseline an operable system that meets the SLD mission and to ensure the system continues to perform as expected in an operational environment with Argentina Customs effectively adjudicating alarms.
Director, Operational Test and Evaluation FY 2015 Annual Report
2016-01-01
review. For example, where a wind turbine project was found to have the potential to seriously degrade radar cross section testing at the Naval Air...Assessment Plan U.S. Special Operations Command Tempest Wind 2015 Assessment Plan U.S. Transportation Command Turbo Challenge 2015 Final Assessment...U.S. Air Forces Central Command 2015 May 2015 U.S. Special Operations Command-Pacific Tempest Wind 2014 May 2015 North American Aerospace Defense
Hanford Spent Nuclear Fuel Project recommended path forward
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fulton, J.C.
The Spent Nuclear Fuel Project (the Project), in conjunction with the U.S. Department of Energy-commissioned Independent Technical Assessment (ITA) team, has developed engineered alternatives for expedited removal of spent nuclear fuel, including sludge, from the K Basins at Hanford. These alternatives, along with a foreign processing alternative offered by British Nuclear Fuels Limited (BNFL), were extensively reviewed and evaluated. Based on these evaluations, a Westinghouse Hanford Company (WHC) Recommended Path Forward for K Basins spent nuclear fuel has been developed and is presented in Volume I of this document. The recommendation constitutes an aggressive series of projects to construct andmore » operate systems and facilities to safely retrieve, package, transport, process, and store K Basins fuel and sludge. The overall processing and storage scheme is based on the ITA team`s proposed passivation and vault storage process. A dual purpose staging and vault storage facility provides an innovative feature which allows accelerated removal of fuel and sludge from the basins and minimizes programmatic risks beyond any of the originally proposed alternatives. The projects fit within a regulatory and National Environmental Policy Act (NEPA) overlay which mandates a two-phased approach to construction and operation of the needed facilities. The two-phase strategy packages and moves K Basins fuel and sludge to a newly constructed Staging and Storage Facility by the year 2000 where it is staged for processing. When an adjoining facility is constructed, the fuel is cycled through a stabilization process and returned to the Staging and Storage Facility for dry interim (40-year) storage. The estimated total expenditure for this Recommended Path Forward, including necessary new construction, operations, and deactivation of Project facilities through 2012, is approximately $1,150 million (unescalated).« less
DOT National Transportation Integrated Search
2016-11-01
The Federal Motor Carrier Safety Administration (FMCSA) established the FAST DASH program to perform efficient independent evaluations of promising safety technologies aimed at commercial vehicle operations. In this third FAST DASH safety technology ...
DOT National Transportation Integrated Search
2001-10-01
This project evaluated the safety and operational impacts of two alternative left-turn treatments from driveways/side streets. The two treatments were (1) direct left turns and (2) right turns followed by U-turns. Safety analyses of the alternatives ...
Test and Evaluation Project No. 28: Anti-icing Technology, Field Evaluation Report
DOT National Transportation Integrated Search
1998-03-01
The report provides a detailed glimpse at the state-of-the-art of U.S. anti-icing operations, and simultaneous road and weather conditions, prior to the 1996 publication of the anti-icing Manual of Practice. It will be useful to those who wish to exa...
42 CFR 51c.404 - Grant evaluation and award.
Code of Federal Regulations, 2011 CFR
2011-10-01
... for health services delivery and management; (vi) The soundness of the fiscal plan for assuring... Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR COMMUNITY HEALTH SERVICES Grants for Operating Community Health Projects § 51c.404 Grant evaluation and award. (a...
42 CFR 51c.404 - Grant evaluation and award.
Code of Federal Regulations, 2012 CFR
2012-10-01
... for health services delivery and management; (vi) The soundness of the fiscal plan for assuring... Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR COMMUNITY HEALTH SERVICES Grants for Operating Community Health Projects § 51c.404 Grant evaluation and award. (a...
42 CFR 51c.404 - Grant evaluation and award.
Code of Federal Regulations, 2014 CFR
2014-10-01
... for health services delivery and management; (vi) The soundness of the fiscal plan for assuring... Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR COMMUNITY HEALTH SERVICES Grants for Operating Community Health Projects § 51c.404 Grant evaluation and award. (a...
42 CFR 51c.404 - Grant evaluation and award.
Code of Federal Regulations, 2013 CFR
2013-10-01
... for health services delivery and management; (vi) The soundness of the fiscal plan for assuring... Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR COMMUNITY HEALTH SERVICES Grants for Operating Community Health Projects § 51c.404 Grant evaluation and award. (a...
ERIC Educational Resources Information Center
Kennedy, Kerry J.
The processes of instructional materials development and dissemination used in four Stanford Program on International and Cross Cultural Education (SPICE) projects dealing with Latin America, Africa, China, and Japan are described, and evaluative comments based on a review of the curriculum development process are made. The major purpose of the…
Analysis of the Operational Test and Evaluation of the CBRNE Crime Scene Modeller (C2SM)
2014-07-09
International Society for Optical Engineering, vol.7305, 730509 (10 pp), 2009. 2 It should be noted that these two projects are somewhat unique in...effectiveness of the capability as well as an opportunity to receive an arm’s length peer evaluation by an audience of International expert LE personnel with...Operators. Proceedings of the SPIE - The International Society for Optical Engineering, vol.7666, 76660N (8 pp.), 2010. 8 Note: the scenario is
DOE Office of Scientific and Technical Information (OSTI.GOV)
Flanigan, Tom; Pybus, Craig; Roy, Sonya
This report summarizes the results of the Pre-Front End Engineering Design (pre-FEED) phase of a proposed advanced oxy-combustion power generation plant to repower the existing 200 MWe Unit 4 at Ameren Energy Resources’ (AER) Meredosia Power Plant. AER has formed an alliance with Air Liquide Process and Construction, Inc. (ALPC) and Babcock & Wilcox Power Generation Group (B&W PGG) for the design, construction, and testing of the facility, and has contracted with URS Corporation (URS) for preliminary design and Owner’s engineering services. The Project employs oxy-combustion technology – combustion of coal with nearly pure oxygen and recycled flue gas (insteadmore » of air) – to capture approximately 90% of the flue gas CO2 for transport and sequestration by another Project. Plant capacity and configuration has been developed based on the B&W PGG-ALPC cool recycle process firing high-sulfur bituminous coal fuel, assuming baseload plant operation to maximize existing steam turbine capability, with limited consideration for plant redundancy and performance optimization in order to keep plant costs as low as practical. Activities and preliminary results from the pre-FEED phase addressed in this report include the following: Overall plant thermal performance; Equipment sizing and system configuration; Plant operation and control philosophy; Plant emissions and effluents; CO 2 production and recovery characteristics; Project cost estimate and economic evaluation; Integrated project engineering and construction schedule; Project risk and opportunity assessment; Development of Project permitting strategy and requirements During the Phase 2 of the Project, additional design details will be developed and the Phase 1 work products updated to support actual construction and operation of the facility in Phase 3. Additional information will be provided early in Phase 2 to support Ameren-Environmental in finalizing the appropriate permitting strategies and permit applications. Additional performance and reliability enhancements will also be evaluated in Phase 2 to try to improve overall project economics.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gupta, Mukesh; Niemi, Belinda; Paik, Ingle
2015-09-02
In 2012, One System Nuclear Safety performed a comparison of the safety bases for the Tank Farms Operations Contractor (TOC) and Hanford Tank Waste Treatment and Immobilization Plant (WTP) (RPP-RPT-53222 / 24590-WTP-RPT-MGT-12-018, “One System Report of Comparative Evaluation of Safety Bases for Hanford Waste Treatment and Immobilization Plant Project and Tank Operations Contract”), and identified 25 recommendations that required further evaluation for consensus disposition. This report documents ten NSSC approved consistent methodologies and guides and the results of the additional evaluation process using a new set of evaluation criteria developed for the evaluation of the new methodologies.
Wind-to-Hydrogen Project | Hydrogen and Fuel Cells | NREL
. Research Focus NREL's research focuses on: Exploring system-level integration issues related to multiple to enable cost evaluations/reductions and efficiency improvements Exploring operational challenges
ERIC Educational Resources Information Center
Ventouratos, Despina
Enhancement of Learning through an Integrated Teaching Environment (Project ELITE), a federally-funded bilingual education program, served 233 students of limited English proficiency in two high schools in Queens (New York) in its second year of operation. Participating students received instruction in English as a Second Language (ESL),…
Newton High School Project Capable, 1982-1983. O.E.E. Evaluation Report.
ERIC Educational Resources Information Center
Young, John; And Others
Project CAPABLE, in its first year of funding, provided instruction in English as a Second Language (ESL) and native language skills, as well as bilingual instruction in science and social studies, to approximately 500 Chinese, Korean, and Vietnamese students in grades 9-12. The program operated at three sites in the New York City borough of…
ERIC Educational Resources Information Center
Williams, Julie E.; And Others
The Appalachian Adolescent Health and Education Project (AAHEP), in operation for 3 years, is a program designed to reduce adolescent pregnancy rates (prevention component) and provide care for pregnant teenagers (care component) in East Tennessee. Limitations in funding and service delivery prompted the AAHEP to modify its 15-county scope by…
ERIC Educational Resources Information Center
New York City Board of Education, Brooklyn. Office of Educational Assessment.
In 1984-85, the New York City Public Schools received $2,374,686 from the state legislature to operate the School Community Education Program (also known as the Umbrella Program). The program consisted of 46 different projects designed to provide innovative solutions to local educational and school problems. Thirteen of these projects are…
This report documents the activities performed during and the results obtained from the first 10 months of system operation of an arsenic (As) and uranium (U) removal technology being demonstrated at Upper Bodfish in Lake Isabella, CA. The objectives of the project are to evalua...
FM Radio; An Oral Communication Project for Migrants in Palm Beach County.
ERIC Educational Resources Information Center
Early, L. F.
This report gives a full description of the broadcasting and operation of WHRS-FM, a FM radio station established by federal grant to serve migrant workers and their children in Palm Beach County, Florida. The goal of the project was to evaluate FM radio as a solution to the serious economic and educational problem of communicating with the…
ERIC Educational Resources Information Center
Boronow, Yvette
Bilingual Education through Architectural Mathematics (Project BEAM) is a federally-funded program in its fourth year of operation in 1992-93. It served 226 limited-English-proficient Spanish-speaking students in two Bronx (New York) elementary schools. Students received instruction in English as a second language (ESL), native language arts…
Spatial evaluation of precipitation in two large watersheds in north-central Arizona
Boris Poff; Assefa Desta; Aregai Tecle
2004-01-01
The USDA Forest Service established the Beaver Creek Experimental Watershed Pilot Project in north-central Arizona in 1957 and operated it until 1982. After the Forest Service discontinued the project in 1982, Northern Arizona University's School of Forestry continued to monitor and do research in two of the largest watersheds, known as Woods Canyon and Bar M....
This report documents the activities performed during and the results obtained from the operation of an arsenic and antimony removal technology demonstrated at the South Truckee Meadows General Improvement District (STMGID) in Washoe County, NV. The objectives of the project wer...
Annual Report and Evaluation, ESEA Title I (P. L. 89-10), Fiscal Year 1972.
ERIC Educational Resources Information Center
Cupp, Marion E.; Farris, Dale
In the State of Washington, 297 of 316 local school districts operated Title I, Elementary Secondary Education Act projects during Fiscal Year 1972 with approximately 12,272,000 dollars appropriated. The bulk of Title I funds (85 percent) supported project activities in the 25 largest school districts where most of the target populations are…
Evaluating technology for marine inspectors
NASA Astrophysics Data System (ADS)
Hansen, Kurt A.
1996-11-01
The Coast Guard is responsible for the safety of thousands of vessels which carry passengers and cargo throughout the US. The Research and Development Center has had several projects with the objective of identifying advanced technologies that can increase the safety and efficiency of vessel inspections, especially structural surveys. The aim is to find technologies which will increase inspection coverage while still providing a complete and accurate condition of the vessel. One project focused on the basic technology items such as improved lighting, improved monitors to determine air quality, and use of visual enhancements such as binoculars and night-vision equipment which the inspectors could use directly. It continued on to more advanced nondestructive and visual methodologies which may not find the actual damage, but will indicate the most likely location to the inspector. These included magnetic climbers, robotics, advanced video camera systems and fiber- optic videoscopes, laser ultrasonics and climbing inspectors which utilize mountaineering techniques. Most of these advanced methods are more likely to be used by independent surveyors, classification societies or others hired by the vessel owners and operators. The Coast Guard needs to evaluate the effectiveness of these techniques to ensure the reliability of the information received and to bring some of the technology to the attention of owners and operators. Another project begun this year is investigating the nondestructive evaluation of metal fasteners in wooden boats. This paper provides an overview of these projects.
Evaluation strategy for the I-95 CC electronic credentialing program
DOT National Transportation Integrated Search
1999-03-01
The electronic credentialing field operational test will undertake the model deployment of electronic credentialing for commercial vehicles. The project will involve the development of state-specific electronic credentialing systems.
Evaluation of scanning earth sensor mechanism on engineering test satellite 4
NASA Technical Reports Server (NTRS)
Ikeuchi, M.; Wakabayashi, Y.; Ohkami, Y.; Kida, T.; Ishigaki, T.; Matsumoto, M.
1983-01-01
The results of the analysis and the evaluation of flight data obtained from the horizon sensor test project are described. The rotary mechanism of the scanning earth sensor composed of direct drive motor and bearings using solid lubricant is operated satisfactorily. The transmitted flight data from Engineering Test Satellite IV was evaluated in comparison with the design value.
ERIC Educational Resources Information Center
Costa, Ann Marie
2012-01-01
A recent law in a New England state allowed public schools to operate with increased flexibility and autonomy through the authorization of the creation of Innovation Schools. This project study, a program evaluation using a convergent parallel mixed methods research design, allowed for a comprehensive evaluation of the first Innovation School…
Michigan Day Care Provider Training Project, Year One: An Evaluation.
ERIC Educational Resources Information Center
Kaplan, Melissa G.; And Others
A Title XX funded statewide training program offering 20 hours of instruction for 1,662 licensed center and home child care providers who served Title XX eligible children in Michigan was evaluated at the end of its first year of operation. The first three chapters of this evaluation report discuss (1) the history, philosophy, and goals of the…
Ralphs Grocery EC-Diesel Truck Fleet: Final Results
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2003-02-01
DOE's Office of Heavy Vehicle Technologies sponsored a research project with Ralphs Grocery Company to collect and analyze data on the performance and operation of 15 diesel trucks fueled with EC-Diesel in commercial service. These trucks were compared to 5 diesel trucks fueled with CARB diesel and operating on similar routes. This document reports this evaluation.
ERIC Educational Resources Information Center
Reyer, Ronald
A project was conducted to analyze, design, develop, implement, and evaluate an instructional unit intended to improve the diagnostic skills of operating personnel in responding to abnormal and emergency conditions at the High Flux Beam Reactor at Brookhaven National Laboratory. Research was conducted on the occurrence of emergencies at similar…
Design requirements for operational earth resources ground data processing
NASA Technical Reports Server (NTRS)
Baldwin, C. J.; Bradford, L. H.; Burnett, E. S.; Hutson, D. E.; Kinsler, B. A.; Kugle, D. R.; Webber, D. S.
1972-01-01
Realistic tradeoff data and evaluation techniques were studied that permit conceptual design of operational earth resources ground processing systems. Methodology for determining user requirements that utilize the limited information available from users is presented along with definitions of sensor capabilities projected into the shuttle/station era. A tentative method is presented for synthesizing candidate ground processing concepts.
Southeast geysers effluent pipeline project. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dellinger, M.
1998-01-15
The project concept originated in 1990 with the convergence of two problems: (1) a need for augmented injection to mitigate declining reservoir productivity at the Geysers; and (2) a need for a new method of wastewater disposal for Lake County communities near the The Geysers. A public/private partnership of Geysers operators and the Lake County Sanitation District (LACOSAN) was formed in 1991 to conduct a series of engineering, environmental, and financing studies of transporting treated wastewater effluent from the communities to the southeast portion of The Geysers via a 29-mile pipeline. By 1994, these evaluations concluded that the concept wasmore » feasible and the stakeholders proceeded to formally develop the project, including pipeline and associated facilities design; preparation of an environmental impact statement; negotiation of construction and operating agreements; and assembly of $45 million in construction funding from the stakeholders, and from state and federal agencies with related program goals. The project development process culminated in the system`s dedication on October 16, 1997. As of this writing, all project components have been constructed or installed, successfully tested in compliance with design specifications, and are operating satisfactorily.« less
Digital Radiography Qualification of Tube Welding
NASA Technical Reports Server (NTRS)
Carl, Chad
2012-01-01
The Orion Project will be directing Lockheed Martin to perform orbital arc welding on commodities metallic tubing as part of the Multi Purpose Crew Vehicle assembly and integration process in the Operations and Checkout High bay at Kennedy Space Center. The current method of nondestructive evaluation is utilizing traditional film based x-rays. Due to the high number of welds that are necessary to join the commodities tubing (approx 470), a more efficient and expeditious method of nondestructive evaluation is desired. Digital radiography will be qualified as part of a broader NNWG project scope.
Halloran, J P; Ross, M W; Huffman, L
1996-01-01
Social and political pressure, as well as public health theory, mandate inclusion of PLWHIV in community planning and policy development processes. Barriers to PLWHIV participation may be cognitive, instrumental, and/or affective. The authors report on development, implementation, and initial evaluation of a pilot project testing a psychoeducational intervention to increase organizational participation by people with HIV. Organizational participation by individual increased from a mean of 0.5 organizations at entry to 2.3 at follow-up. Evaluation data indicate that increases in self-esteem, self-confidence, and specific knowledge, along with demystification of organizational operations, networking, and modeling by project staff contributed to the outcome.
Wetherbee, Gregory A.; Martin, RoseAnn
2017-02-06
The U.S. Geological Survey Branch of Quality Systems operates the Precipitation Chemistry Quality Assurance Project (PCQA) for the National Atmospheric Deposition Program/National Trends Network (NADP/NTN) and National Atmospheric Deposition Program/Mercury Deposition Network (NADP/MDN). Since 1978, various programs have been implemented by the PCQA to estimate data variability and bias contributed by changing protocols, equipment, and sample submission schemes within NADP networks. These programs independently measure the field and laboratory components which contribute to the overall variability of NADP wet-deposition chemistry and precipitation depth measurements. The PCQA evaluates the quality of analyte-specific chemical analyses from the two, currently (2016) contracted NADP laboratories, Central Analytical Laboratory and Mercury Analytical Laboratory, by comparing laboratory performance among participating national and international laboratories. Sample contamination and stability are evaluated for NTN and MDN by using externally field-processed blank samples provided by the Branch of Quality Systems. A colocated sampler program evaluates the overall variability of NTN measurements and bias between dissimilar precipitation gages and sample collectors.This report documents historical PCQA operations and general procedures for each of the external quality-assurance programs from 2007 to 2016.
Blais, R; Joubert, P
2000-01-01
In 1990, the province of Quebec adopted a law authorizing the evaluation of the practice of midwifery through eight pilot projects. The projects, which took the form of birth centres outside hospitals, started operating in 1994. The objectives of the evaluation were 1) to compare midwives' services to current physician services with regard to maternal and neonatal mortality and morbidity, the use of obstetrical intervention, individualization and continuity of care as perceived by clients, and cost; and 2) to identify the professional and organizational factors associated with the integration of midwives into the health care system. A mixed evaluative design was used: a multiple case study with each pilot project representing a case and a cohort study where 1,000 women followed by midwives in the birth centres were matched with 1,000 women followed by physicians in the usual hospital-based services. Various quantitative and qualitative data collection instruments were used. Overall, many results were favourable to midwifery practice, while some were favourable to medical care. Following the evaluation, the Government of Quebec decided to legalize the practice of midwifery.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bonneville Power Administration; Washington Department of Fish and Wildlife; Oregon Department of Fish and Wildlife
2006-11-01
The purpose of this Study is to provide an economic review of current and proposed changes to the Select Area Fishery Evaluation Project (SAFE or Project). The Study results are the information requested in comments made on the Project by a joint review dated March 2005 by the Northwest Power and Conservation Council (NPCC) Independent Scientific Review Panel (ISRP) and Independent Economic Analysis Board (IEAB). North et al. (2006) addressed technical questions about operations and plans, and this report contains the response information for comments concerning Project economics. This report can be considered an economic feasibility review meeting guidelines formore » cost-effective analysis developed by the IEAB (2003). It also contains other economic measurement descriptions to illustrate the economic effects of SAFE. The SAFE is an expansion of a hatchery project (locally called the Clatsop Economic Development Council Fisheries Project or CEDC) started in 1977 that released an early run coho (COH) stock into the Youngs River. The Youngs River entrance to the Columbia River at River Mile 12 is called Youngs Bay, which is located near Astoria, Oregon. The purpose of the hatchery project was to provide increased fishing opportunities for the in-river commercial fishing gillnet fleet. Instead of just releasing fish at the hatchery, a small scale net pen acclimation project in Youngs Bay was tried in 1987. Hirose et al. (1998) found that 1991-1992 COH broodstock over-wintered at the net pens had double the smolt-to-adult return rate (SAR) of traditional hatchery release, less than one percent stray rates, and 99 percent fishery harvests. It was surmised that smolts from other Columbia River hatcheries could be hauled to the net pens for acclimation and release to take advantage of the SAR's and fishing rates. Proposals were tendered to Bonneville Power Administration (BPA) and other agencies to fund the expansion for using other hatcheries smolts and other off-channel release sites. The BPA, who had been providing funds to the Project since 1982, greatly increased their financial participation for the experimental expansion of the net pen operations in 1993. Instead of just being a funding partner in CEDC operations, the BPA became a major financing source for other hatchery production operations. The BPA has viewed the 10 plus years of funding since then as an explorative project with two phases: a 'research' phase ending in 1993, and a 'development' phase ending in 2006. The next phase is referred to in proposals to BPA for continued funding as an 'establishment' phase to be started in 2007. There are three components of SAFE: (1) The CEDC owns and operates the net pens in the Columbia River estuary on the Oregon side. The CEDC also owns and operates a hatchery on the South Fork Klaskanine River. (2) There are many other hatcheries contributing smolts to the net pen operations. The present suite of hatcheries are operated by the Washington Department of Fish and Wildlife (WDFW) and Oregon Department of Fish and Wildlife (ODFW). The WDFW owns and operates the net pens at Deep River on the Washington side of the Columbia River. (3) The monitoring and evaluation (M&E) responsibilities are performed by employees of WDFW and ODFW. BPA provides funding for all three components as part of NPCC Project No. 199306000. The CEDC and other contributing hatcheries have other sources of funds that also support the SAFE. BPA's minor share (less than 10 percent) of CEDC funding in 1982 grew to about 55 percent in 1993 with the beginning of the development phase of the Project. The balance of the CEDC budget over the years has been from other federal, state, and local government programs. It has also included a 10 percent fee assessment (five percent of ex-vessel value received by harvesters plus five percent of purchase value made by processors) on harvests that take place in off-channel locations near the release sites. The CEDC total annual budget in the last several years has been in the $600 to $700 thousand range. The Project over the years also has relied on heavy volunteer participation and other agency in-kind support. The CEDC budget is exclusive of WDFW and ODFW M&E costs, and all non-CEDC hatchery smolt production costs. The annual estimated operation and management costs for SAFE except for the value of volunteer time and donated materials is in the $2.4 million range. Of this amount, BPA annual funding has been in the $1.6 million or two thirds range in recent years. Depreciation on capital assets (or an equivalent amount for annual contributions to a capital improvement fund) would be in addition to these operation and management costs. North et al. (2006) documented results through the second of three phases and described potential capacities. Full capacity as defined in early planning for the project (TRG 1996) was not reached by the time the second phase ended.« less
Improving Operational Wargaming: Its All Fun and Games Until Someone Loses a War
2016-05-26
Approved for public release; distribution is unlimited Improving Operational Wargaming: It’s All Fun and Games Until Someone Loses a War A...Improving Operational Wargaming: It’s All Fun and Games Until Someone Loses a War Sb. GRANT NUMBER Sc. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Sd. PROJECT...theory-including game element analysis and wargame pathologies-provides an excellent rubric for creating and evaluating wargames and wargaming
NASA Astrophysics Data System (ADS)
Benveniste, J.; Cotton, D.; Moreau, T.; Varona, E.; Roca, M.; Cipollini, P.; Cancet, M.; Martin, F.; Fenoglio-Marc, L.; Naeije, M.; Fernandes, J.; Restano, M.; Ambrozio, A.
2016-12-01
The ESA Sentinel-3 satellite, launched in February 2016 as a part of the Copernicus programme, is the second satellite to operate a SAR mode altimeter. The Sentinel 3 Synthetic Aperture Radar Altimeter (SRAL) is based on the heritage from Cryosat-2, but this time complemented by a Microwave Radiometer (MWR) to provide a wet troposphere correction, and operating at Ku and C-Bands to provide an accurate along-track ionospheric correction. Together this instrument package, including both GPS and DORIS instruments for accurate positioning, allows accurate measurements of sea surface height over the ocean, as well as measurements of significant wave height and surface wind speed. SCOOP (SAR Altimetry Coastal & Open Ocean Performance) is a project funded under the ESA SEOM (Scientific Exploitation of Operational Missions) Programme Element, started in September 2015, to characterise the expected performance of Sentinel-3 SRAL SAR mode altimeter products, in the coastal zone and open-ocean, and then to develop and evaluate enhancements to the baseline processing scheme in terms of improvements to ocean measurements. There is also a work package to develop and evaluate an improved Wet Troposphere correction for Sentinel-3, based on the measurements from the on-board MWR, further enhanced mostly in the coastal and polar regions using third party data, and provide recommendations for use. At the end of the project recommendations for further developments and implementations will be provided through a scientific roadmap. In this presentation we provide an overview of the SCOOP project, highlighting the key deliverables and discussing the potential impact of the results in terms of the application of delay-Doppler (SAR) altimeter measurements over the open-ocean and coastal zone. We also present the initial results from the project, including: Key findings from a review of the current "state-of-the-art" for SAR altimetry, Specification of the initial "reference" delay-Doppler and echo modelling /retracking processing schemes, Evaluation of the initial Test Data Set in the Open Ocean and Coastal Zone Overview of modifications planned to the reference delay-Doppler and echo modelling/ re-tracking processing schemes.
NASA Astrophysics Data System (ADS)
Oyedotun, Temitope D. Timothy
2017-11-01
The need and demand for water in the world are becoming acute with the growing population. This is mostly pressing in developing countries of which Mekelle City in Northern Ethiopia is not an exception. World Bank borehole-support sub-project was aimed at addressing this challenge. The evaluation of the intervention indicates that there is a significant increase in water supply in the city because of the sub-project. However, the increase in water supply has not been able to meet up with the already established and increasing demand. Coupled with this challenge are: the limited capacity of human capital and expertise that will ensure the proper management of borehole interventions; insufficient cost recovery for proper operation and maintenance of the projects; loss of land and farmlands and lack of compensations because of the projects which affect the livelihood.
Final Overview of ACES Simulation for Evaluation SARP Well-Clear Definitions
NASA Technical Reports Server (NTRS)
Santiago, Confesor; Johnson, Marcus A.; Isaacson, Doug; Hershey, David
2014-01-01
The UAS in the NAS project is studying the minimum operational performance standards for unmanned aerial systems (UAS's) detect-and-avoid (DAA) system in order to operate in the National Airspace System. The DoD's Science and research Panel (SARP) Well-Clear Workshop is investigating the time and spatial boundary at which an UAS violates well-clear. NASA is supporting this effort through use of its Airspace Concept Evaluation System (ACES) simulation platform. This briefing presents the final results to the SARP, which will be used to judge the three candidate well-clear definitions, and for the selection of the most operationally suitable option.
Wind-To-Hydrogen Energy Pilot Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ron Rebenitsch; Randall Bush; Allen Boushee
2009-04-24
WIND-TO-HYDROGEN ENERGY PILOT PROJECT: BASIN ELECTRIC POWER COOPERATIVE In an effort to address the hurdles of wind-generated electricity (specifically wind's intermittency and transmission capacity limitations) and support development of electrolysis technology, Basin Electric Power Cooperative (BEPC) conducted a research project involving a wind-to-hydrogen system. Through this effort, BEPC, with the support of the Energy & Environmental Research Center at the University of North Dakota, evaluated the feasibility of dynamically scheduling wind energy to power an electrolysis-based hydrogen production system. The goal of this project was to research the application of hydrogen production from wind energy, allowing for continued wind energymore » development in remote wind-rich areas and mitigating the necessity for electrical transmission expansion. Prior to expending significant funding on equipment and site development, a feasibility study was performed. The primary objective of the feasibility study was to provide BEPC and The U.S. Department of Energy (DOE) with sufficient information to make a determination whether or not to proceed with Phase II of the project, which was equipment procurement, installation, and operation. Four modes of operation were considered in the feasibility report to evaluate technical and economic merits. Mode 1 - scaled wind, Mode 2 - scaled wind with off-peak, Mode 3 - full wind, and Mode 4 - full wind with off-peak In summary, the feasibility report, completed on August 11, 2005, found that the proposed hydrogen production system would produce between 8000 and 20,000 kg of hydrogen annually depending on the mode of operation. This estimate was based on actual wind energy production from one of the North Dakota (ND) wind farms of which BEPC is the electrical off-taker. The cost of the hydrogen produced ranged from $20 to $10 per kg (depending on the mode of operation). The economic sensitivity analysis performed as part of the feasibility study showed that several factors can greatly affect, both positively and negatively, the "per kg" cost of hydrogen. After a September 15, 2005, meeting to evaluate the advisability of funding Phase II of the project DOE concurred with BEPC that Phase I results did warrant a "go" recommendation to proceed with Phase II activities. The hydrogen production system was built by Hydrogenics and consisted of several main components: hydrogen production system, gas control panel, hydrogen storage assembly and hydrogen-fueling dispenser The hydrogen production system utilizes a bipolar alkaline electrolyzer nominally capable of producing 30 Nm3/h (2.7 kg/h). The hydrogen is compressed to 6000 psi and delivered to an on-site three-bank cascading storage assembly with 80 kg of storage capacity. Vehicle fueling is made possible through a Hydrogenics-provided gas control panel and dispenser able to fuel vehicles to 5000 psi. A key component of this project was the development of a dynamic scheduling system to control the wind energy's variable output to the electrolyzer cell stacks. The dynamic scheduling system received an output signal from the wind farm, processed this signal based on the operational mode, and dispatched the appropriate signal to the electrolyzer cell stacks. For the study BEPC chose to utilize output from the Wilton wind farm located in central ND. Site design was performed from May 2006 through August 2006. Site construction activities were from August to November 2006 which involved earthwork, infrastructure installation, and concrete slab construction. From April - October 2007, the system components were installed and connected. Beginning in November 2007, the system was operated in a start-up/shakedown mode. Because of numerous issues, the start-up/shakedown period essentially lasted until the end of January 2008, at which time a site acceptance test was performed. Official system operation began on February 14, 2008, and continued through the end of December 2008. Several issues continued to prevent consistent operation, resulting in operation of the system in fits and starts. During the operational period, three ramp tests were performed on the electrolyzer cell stacks to evaluate cell stack degradation, if present. In addition, from December 23 - 30 2008, the hydrogen system was operated using Mode 1 protocol. From February 14, 2008 - December 31, 2008, the system produced a total of just less than 26,000,000 liters (2320 kg), including approximately 3,300,000 liters (295 kg) of hydrogen during Mode 1 operation. Unfortunately, the chronic shutdown issues prevented consistent operation and, therefore, did not allow for any accurate economic analysis as originally intended. With that said, much valuable experience was gained in the form of "lessons learned," and the project served as an extremely valuable platform for educating the public.« less
NASA Technical Reports Server (NTRS)
Perkins, Sharon; Martin, Andrea; Bavinger, Bill
1990-01-01
The Trajectory Operations Applications Software Task (TOAST) is a software development project whose purpose is to provide trajectory operation pre-mission and real-time support for the Space Shuttle. The purpose of the evaluation was to evaluate TOAST as an Application Manager - to assess current and planned capabilities, compare capabilities to commercially-available off the shelf (COTS) software, and analyze requirements of MCC and Flight Analysis Design System (FADS) for TOAST implementation. As a major part of the data gathering for the evaluation, interviews were conducted with NASA and contractor personnel. Real-time and flight design users, orbit navigation users, the TOAST developers, and management were interviewed. Code reviews and demonstrations were also held. Each of these interviews was videotaped and transcribed as appropriate. Transcripts were edited and are presented chronologically.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, L.W.
The objective of the project was to characterize and document the critical operating parameters of an 0.8-micron, 350-MHz, 32-bit microprocessor prototype. The roles of FM and T and the participant company were: FM and T -- evaluation performance of the prototype 32-bit microprocessor using the IDS5000 and Tektronix S3260 Integrated Circuit Test System; Corda -- design and build the prototype microprocessor. This project was terminated with nearly all of the planned activities unaddressed.
NASA Technical Reports Server (NTRS)
Lohmann, R. P.; Szetela, E. J.; Vranos, A.
1978-01-01
The impact of the use of broad specification fuels on the design, performance durability, emissions and operational characteristics of combustors for commercial aircraft gas turbine engines was assessed. Single stage, vorbix and lean premixed prevaporized combustors, in the JT9D and an advanced energy efficient engine cycle were evaluated when operating on Jet A and ERBS (Experimental Referee Broad Specification) fuels. Design modifications, based on criteria evolved from a literature survey, were introduced and their effectiveness at offsetting projected deficiencies resulting from the use of ERBS was estimated. The results indicate that the use of a broad specification fuel such as ERBS, will necessitate significant technology improvements and redesign if deteriorated performance, durability and emissions are to be avoided. Higher radiant heat loads are projected to seriously compromise liner life while the reduced thermal stability of ERBS will require revisions to the engine-airframe fuel system to reduce the thermal stress on the fuel. Smoke and emissions output are projected to increase with the use of broad specification fuels. While the basic geometry of the single stage and vorbix combustors are compatible with the use of ERBS, extensive redesign of the front end of the lean premixed prevaporized burner will be required to achieve satisfactory operation and optimum emissions.
Unified-theory-of-reinforcement neural networks do not simulate the blocking effect.
Calvin, Nicholas T; J McDowell, J
2015-11-01
For the last 20 years the unified theory of reinforcement (Donahoe et al., 1993) has been used to develop computer simulations to evaluate its plausibility as an account for behavior. The unified theory of reinforcement states that operant and respondent learning occurs via the same neural mechanisms. As part of a larger project to evaluate the operant behavior predicted by the theory, this project was the first replication of neural network models based on the unified theory of reinforcement. In the process of replicating these neural network models it became apparent that a previously published finding, namely, that the networks simulate the blocking phenomenon (Donahoe et al., 1993), was a misinterpretation of the data. We show that the apparent blocking produced by these networks is an artifact of the inability of these networks to generate the same conditioned response to multiple stimuli. The piecemeal approach to evaluate the unified theory of reinforcement via simulation is critiqued and alternatives are discussed. Copyright © 2015 Elsevier B.V. All rights reserved.
DOT National Transportation Integrated Search
2001-10-01
This project evaluated the safety and operational impacts of two alternative left-turn treatments from driveway/side streets. The two treatments were: (1) direct left turns and, (2) right turns followed by U-turns. Safety analyses of the alternatives...
ERIC Educational Resources Information Center
Meredith, Joseph C.
1980-01-01
Provides a critical evaluation of the not yet completed "Encyclopedia of Library and Information Science" with quotations from numerous reviews and presents a plan for the selection of articles and revision of this work in order to salvage the project. (CHC)
34 CFR 636.21 - What selection criteria does the Secretary use to evaluate an application?
Code of Federal Regulations, 2011 CFR
2011-07-01
...) Agencies of local government. (ii) Public and private elementary and secondary schools. (iii) Business... implementation strategy for each key project component activity is— (i) Comprehensive; (ii) Based on a sound... operation; (5) Describe a time-line chart that relates key evaluation processes and benchmarks to other...
34 CFR 636.21 - What selection criteria does the Secretary use to evaluate an application?
Code of Federal Regulations, 2014 CFR
2014-07-01
...) Agencies of local government. (ii) Public and private elementary and secondary schools. (iii) Business... implementation strategy for each key project component activity is— (i) Comprehensive; (ii) Based on a sound... operation; (5) Describe a time-line chart that relates key evaluation processes and benchmarks to other...
34 CFR 636.21 - What selection criteria does the Secretary use to evaluate an application?
Code of Federal Regulations, 2013 CFR
2013-07-01
...) Agencies of local government. (ii) Public and private elementary and secondary schools. (iii) Business... implementation strategy for each key project component activity is— (i) Comprehensive; (ii) Based on a sound... operation; (5) Describe a time-line chart that relates key evaluation processes and benchmarks to other...
34 CFR 636.21 - What selection criteria does the Secretary use to evaluate an application?
Code of Federal Regulations, 2012 CFR
2012-07-01
...) Agencies of local government. (ii) Public and private elementary and secondary schools. (iii) Business... implementation strategy for each key project component activity is— (i) Comprehensive; (ii) Based on a sound... operation; (5) Describe a time-line chart that relates key evaluation processes and benchmarks to other...
ERIC Educational Resources Information Center
Egan, Thomas A.; Seidel, Janet C.
Evaluation of an ESEA Title III project, "An Inter-Disciplinary Problem Solving Approach to Environmental Education" located in Berks County, Pennsylvania, is offered in this interim report. The report is primarily concerned with the degree to which operational and management process objectives are being achieved in each of four…
Ten state-of-the-science regional air quality (AQ) modeling systems have been applied to continental scale domains in North America and Europe for full-year simulations of 2006 in the context of Air Quality Model Evaluation International Initiative (AQMEII), whose main goals are ...
DOT National Transportation Integrated Search
1972-11-01
Report contains a description of the work done to evaluate the capability of the urban mass transit industry to report financial and operating data through a uniform reporting system. Techniques used in the evaluation included a questionnaire survey ...
Grizzly Substation Fiber Optics : Environmental Assessment.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration.
1998-02-01
This notice announces BPA`s decision to construct, operate, and maintain the Grizzly Substation Fiber Optic Project (Project). This Project is part of a continuing effort by BPA to complete a regionwide upgrade of its existing telecommunications system. The US Forest Service and BPA jointly prepared the Grizzly Substation Fiber Optic Project Environmental Assessment (EA) (DOE/EA-1241) evaluating the potential environmental impacts of the Proposed Action, the Underground Installation Alternative, and the No Action Alternative. Based on the analysis in the EA, the US Forest Service and BPA have determined that the Proposed Action is not a major Federal action significantly affectingmore » the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI. The US Forest Service has separately issued a FONSI and Decision Notice authorizing BPA to construct, operate, and maintain the Project within the Crooked River National Grassland (Grassland).« less
Crew and Display Concepts Evaluation for Synthetic / Enhanced Vision Systems
NASA Technical Reports Server (NTRS)
Bailey, Randall E.; Kramer, Lynda J.; Prinzel, Lawrence J., III
2006-01-01
NASA s Synthetic Vision Systems (SVS) project is developing technologies with practical applications that strive to eliminate low-visibility conditions as a causal factor to civil aircraft accidents and replicate the operational benefits of clear day flight operations, regardless of the actual outside visibility condition. Enhanced Vision System (EVS) technologies are analogous and complementary in many respects to SVS, with the principle difference being that EVS is an imaging sensor presentation, as opposed to a database-derived image. The use of EVS in civil aircraft is projected to increase rapidly as the Federal Aviation Administration recently changed the aircraft operating rules under Part 91, revising the flight visibility requirements for conducting operations to civil airports. Operators conducting straight-in instrument approach procedures may now operate below the published approach minimums when using an approved EVS that shows the required visual references on the pilot s Head-Up Display. An experiment was conducted to evaluate the complementary use of SVS and EVS technologies, specifically focusing on new techniques for integration and/or fusion of synthetic and enhanced vision technologies and crew resource management while operating under the newly adopted FAA rules which provide operating credit for EVS. Overall, the experimental data showed that significant improvements in SA without concomitant increases in workload and display clutter could be provided by the integration and/or fusion of synthetic and enhanced vision technologies for the pilot-flying and the pilot-not-flying.
Rosenberg, Alana; Hartwig, Kari; Merson, Michael
2008-02-01
Given current donor attention to orphans and children made vulnerable by HIV/AIDS, and the need for a new framework that recognizes the complementary roles of nations and non-governmental organizations (NGOs), this analysis reviews NGO-operated community-based orphans and vulnerable children (OVC) projects in Botswana, Lesotho, Namibia, South Africa, and Swaziland. There has been a lack of attention within the field of evaluation to inter-organizational relationships, specifically those with government agencies, as a factor in sustainability. We analyzed evaluations of nine OVC projects funded by the Bristol-Myers Squibb Foundation for the influence of government-NGO collaboration on project sustainability. For eight of the nine projects, evaluations provided evidence of the importance of the government partnership for sustainability. Government collaboration was important in projects designed to help families access government grants, initiate community-based solutions, and advocate for OVC rights through legislation. Government partnerships were also critical to the sustainability of two projects involved in placing children in foster care, but these showed signs of tension with government partners. In addition to the more common factors associated with sustainability, such as organizational characteristics, donors and NGOs should concentrate on developing strong partnerships with local and national government agencies for the sustainability of their projects.
NASA Work Breakdown Structure (WBS) Handbook
NASA Technical Reports Server (NTRS)
Terrell, Stefanie M.
2018-01-01
The purpose of this document is to provide program/project teams necessary instruction and guidance in the best practices for Work Breakdown Structure (WBS) and WBS dictionary development and use for project implementation and management control. This handbook can be used for all types of NASA projects and work activities including research, development, construction, test and evaluation, and operations. The products of these work efforts may be hardware, software, data, or service elements (alone or in combination). The aim of this document is to assist project teams in the development of effective work breakdown structures that provide a framework of common reference for all project elements.
NASA Technical Reports Server (NTRS)
Chafin, R. L.; Martin, T. H.
1980-01-01
The project plan was to hold focus groups to identify the factors influencing the ease of use characteristics of software and to bond the problem. A questionnaire survey was conducted to evaluate those factors which were more appropriately measured with that method. The performance oriented factors were analyzed and relationships hypothesized. The hypotheses were put to test in the experimental phase of the project. In summary, the initial analysis indicates that there is an initial performance effect favoring computer controlled dialogue but the advantage fades fast as operators become experienced. The user documentation style is seen to have a significant effect on performance. The menu and prompt command formats are preferred by inexperienced operators. The short form mnemonic is least favored. There is no clear best command format but the short form mnemonic is clearly the worst.
Cedar-Iowa River Rail transit project feasibility study.
DOT National Transportation Integrated Search
2006-11-09
Five Seasons Transportation & Parking (FSTP) and the Johnson County Council of : Governments (JCCOG) are interested in evaluating the feasibility of prospective passenger rail : service(s) that would operate over existing trackage of the Cedar Rapids...
Detroit Corridor Evaluation Plan
DOT National Transportation Integrated Search
1998-01-01
THE GOALS OF THIS PROJECT ARE TO (1) MEASURE THE IMPACTS FROM INSTALLING THE EXISTING ITS FACILITIES, (2) DETERMINE WHETHER MOTORISTS' EXHIBIT A BIAS TOWARD FREEWAYS, (3) CALCULATE THE IMPACT OF FREEWAY BIAS, (3) IDENTIFY OPERATIONAL STRATEGIES THAT ...
Evaluation of an Innovative Digital Assessment Tool in Dental Anatomy.
Lam, Matt T; Kwon, So Ran; Qian, Fang; Denehy, Gerald E
2015-05-01
The E4D Compare software is an innovative tool that provides immediate feedback to students' projects and competencies. It should provide consistent scores even when different scanners are used which may have inherent subtle differences in calibration. This study aimed to evaluate potential discrepancies in evaluation using the E4D Compare software based on four different NEVO scanners in dental anatomy projects. Additionally, correlation between digital and visual scores was evaluated. Thirty-five projects of maxillary left central incisors were evaluated. Among these, thirty wax-ups were performed by four operators and five consisted of standard dentoform teeth. Five scores were obtained for each project: one from an instructor that visually graded the project and from four different NEVO scanners. A faculty involved in teaching the dental anatomy course blindly scored the 35 projects. One operator scanned all projects to four NEVO scanners (D4D Technologies, Richardson, TX, USA). The images were aligned to the gold standard, and tolerance set at 0.3 mm to generate a score. The score reflected percentage match between the project and the gold standard. One-way ANOVA with repeated measures was used to determine whether there was a significant difference in scores among the four NEVO scanners. Paired-sample t-test was used to detect any difference between visual scores and the average scores of the four NEVO scanners. Pearson's correlation test was used to assess the relationship between visual and average scores of NEVO scanners. There was no significant difference in mean scores among four different NEVO scanners [F(3, 102) = 2.27, p = 0.0852 one-way ANOVA with repeated measures]. Moreover, the data provided strong evidence that a significant difference existed between visual and digital scores (p = 0.0217; a paired - sample t-test). Mean visual scores were significantly lower than digital scores (72.4 vs 75.1). Pearson's correlation coefficient of 0.85 indicated a strong correlation between visual and digital scores (p < 0.0001). The E4D Compare software provides consistent scores even when different scanners are used and correlates well with visual scores. The use of innovative digital assessment tools in dental education is promising with the E4D Compare software correlating well with visual scores and providing consistent scores even when different scanners are used.
Coolidge solar powered irrigation pumping project
NASA Technical Reports Server (NTRS)
Larson, D. L.
1980-01-01
A 150 kW solar thermal electric power plant which includes over 2100 square meters of parabolic trough type collectors and an organic Rankine cycle turbine engine was constructed on an irrigated farm. The plant is interconnected with the electrical utility grid. Operation is providing an evaluation of equipment performance and operating and maintenance requirements as well as the desirability of an on farm location.
ERIC Educational Resources Information Center
Deschesnes, Marthe; Drouin, Nathalie; Tessier, Caroline; Couturier, Yves
2014-01-01
Purpose: The purpose of this paper is to understand how a Canadian intervention based on a professional development (PD) model did or did not influence schools' capacities to absorb a Healthy School (HS) approach into their operations. This study is the second part of a research project: previously published results regarding this research…
Development of Logistics for Building Radiation Storm Shelters and Their Operational Evaluation
NASA Technical Reports Server (NTRS)
Cerro, Jeffrey A.
2015-01-01
Over the past three years NASA has been studying the operational effectiveness and astronaut protection efficacy of numerous radiation protection shelters for use in space exploration activities outside of earth's magnetosphere. The work presented was part of NASA's Advanced Exploration Systems (AES) RadWorks Storm Shelter project. This paper is a summary of the concept development activities of this third year. Fabricated items were integrated into mock up deep space habitat vehicle sections for operational evaluations. Two full scale human-in-loop simulations were designed, fabricated, and implemented through an Institutional Review Board approved solicited participant assessment process. Fabricated items are described, along with usage scenarios of two protection approaches. Existing ISS type logistics along with proposed variations of those logistics were used. Preliminary Discrete Event Simulation (DES) work is noted to be useful in quantifying and documenting operational performance measures for the two primary shelter methods, including some characterization of radiation dose accumulation over a mission timeline. The project also performed correlation analyses between effective radiation dose and the Risk of Exposure Induced Death (REID) to show that concept level work may be able to include such a performance metric in early stages of mission scenario habitat design trade space investigation.
Human factors evaluation of remote afterloading brachytherapy. Volume 2, Function and task analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Callan, J.R.; Gwynne, J.W. III; Kelly, T.T.
1995-05-01
A human factors project on the use of nuclear by-product material to treat cancer using remotely operated afterloaders was undertaken by the Nuclear Regulatory Commission. The purpose of the project was to identify factors that contribute to human error in the system for remote afterloading brachytherapy (RAB). This report documents the findings from the first phase of the project, which involved an extensive function and task analysis of RAB. This analysis identified the functions and tasks in RAB, made preliminary estimates of the likelihood of human error in each task, and determined the skills needed to perform each RAB task.more » The findings of the function and task analysis served as the foundation for the remainder of the project, which evaluated four major aspects of the RAB system linked to human error: human-system interfaces; procedures and practices; training and qualifications of RAB staff; and organizational practices and policies. At its completion, the project identified and prioritized areas for recommended NRC and industry attention based on all of the evaluations and analyses.« less
Advanced Modular Power Approach to Affordable, Supportable Space Systems
NASA Technical Reports Server (NTRS)
Oeftering, Richard C.; Kimnach, Greg L.; Fincannon, James; Mckissock,, Barbara I.; Loyselle, Patricia L.; Wong, Edmond
2013-01-01
Recent studies of missions to the Moon, Mars and Near Earth Asteroids (NEA) indicate that these missions often involve several distinct separately launched vehicles that must ultimately be integrated together in-flight and operate as one unit. Therefore, it is important to see these vehicles as elements of a larger segmented spacecraft rather than separate spacecraft flying in formation. The evolution of large multi-vehicle exploration architecture creates the need (and opportunity) to establish a global power architecture that is common across all vehicles. The Advanced Exploration Systems (AES) Modular Power System (AMPS) project managed by NASA Glenn Research Center (GRC) is aimed at establishing the modular power system architecture that will enable power systems to be built from a common set of modular building blocks. The project is developing, demonstrating and evaluating key modular power technologies that are expected to minimize non-recurring development costs, reduce recurring integration costs, as well as, mission operational and support costs. Further, modular power is expected to enhance mission flexibility, vehicle reliability, scalability and overall mission supportability. The AMPS project not only supports multi-vehicle architectures but should enable multi-mission capability as well. The AMPS technology development involves near term demonstrations involving developmental prototype vehicles and field demonstrations. These operational demonstrations not only serve as a means of evaluating modular technology but also provide feedback to developers that assure that they progress toward truly flexible and operationally supportable modular power architecture.
Cockpit Adaptive Automation and Pilot Performance
NASA Technical Reports Server (NTRS)
Parasuraman, Raja
2001-01-01
The introduction of high-level automated systems in the aircraft cockpit has provided several benefits, e.g., new capabilities, enhanced operational efficiency, and reduced crew workload. At the same time, conventional 'static' automation has sometimes degraded human operator monitoring performance, increased workload, and reduced situation awareness. Adaptive automation represents an alternative to static automation. In this approach, task allocation between human operators and computer systems is flexible and context-dependent rather than static. Adaptive automation, or adaptive task allocation, is thought to provide for regulation of operator workload and performance, while preserving the benefits of static automation. In previous research we have reported beneficial effects of adaptive automation on the performance of both pilots and non-pilots of flight-related tasks. For adaptive systems to be viable, however, such benefits need to be examined jointly in the context of a single set of tasks. The studies carried out under this project evaluated a systematic method for combining different forms of adaptive automation. A model for effective combination of different forms of adaptive automation, based on matching adaptation to operator workload was proposed and tested. The model was evaluated in studies using IFR-rated pilots flying a general-aviation simulator. Performance, subjective, and physiological (heart rate variability, eye scan-paths) measures of workload were recorded. The studies compared workload-based adaptation to to non-adaptive control conditions and found evidence for systematic benefits of adaptive automation. The research provides an empirical basis for evaluating the effectiveness of adaptive automation in the cockpit. The results contribute to the development of design principles and guidelines for the implementation of adaptive automation in the cockpit, particularly in general aviation, and in other human-machine systems. Project goals were met or exceeded. The results of the research extended knowledge of automation-related performance decrements in pilots and demonstrated the positive effects of adaptive task allocation. In addition, several practical implications for cockpit automation design were drawn from the research conducted. A total of 12 articles deriving from the project were published.
Pengra, Bruce; Gallant, Alisa L.; Zhu, Zhe; Dahal, Devendra
2016-01-01
The U.S. Geological Survey (USGS) has begun the development of operational, 30-m resolution annual thematic land cover data to meet the needs of a variety of land cover data users. The Continuous Change Detection and Classification (CCDC) algorithm is being evaluated as the likely methodology following early trials. Data for training and testing of CCDC thematic maps have been provided by the USGS Land Cover Trends (LC Trends) project, which offers sample-based, manually classified thematic land cover data at 2755 probabilistically located sample blocks across the conterminous United States. These samples represent a high quality, well distributed source of data to train the Random Forest classifier invoked by CCDC. We evaluated the suitability of LC Trends data to train the classifier by assessing the agreement of annual land cover maps output from CCDC with output from the LC Trends project within 14 Landsat path/row locations across the conterminous United States. We used a small subset of circa 2000 data from the LC Trends project to train the classifier, reserving the remaining Trends data from 2000, and incorporating LC Trends data from 1992, to evaluate measures of agreement across time, space, and thematic classes, and to characterize disagreement. Overall agreement ranged from 75% to 98% across the path/rows, and results were largely consistent across time. Land cover types that were well represented in the training data tended to have higher rates of agreement between LC Trends and CCDC outputs. Characteristics of disagreement are being used to improve the use of LC Trends data as a continued source of training information for operational production of annual land cover maps.
Draft evaluation of the frequency for gas sampling for the high burnup confirmatory data project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stockman, Christine T.; Alsaed, Halim A.; Bryan, Charles R.
2015-03-26
This report fulfills the M3 milestone M3FT-15SN0802041, “Draft Evaluation of the Frequency for Gas Sampling for the High Burn-up Storage Demonstration Project” under Work Package FT-15SN080204, “ST Field Demonstration Support – SNL”. This report provides a technically based gas sampling frequency strategy for the High Burnup (HBU) Confirmatory Data Project. The evaluation of: 1) the types and magnitudes of gases that could be present in the project cask and, 2) the degradation mechanisms that could change gas compositions culminates in an adaptive gas sampling frequency strategy. This adaptive strategy is compared against the sampling frequency that has been developed basedmore » on operational considerations. Gas sampling will provide information on the presence of residual water (and byproducts associated with its reactions and decomposition) and breach of cladding, which could inform the decision of when to open the project cask.« less
Evaluation of high-voltage, high-power, solid-state remote power controllers for amps
NASA Technical Reports Server (NTRS)
Callis, Charles P.
1987-01-01
The Electrical Power Branch at Marshall Space Flight Center has a Power System Development Facility where various power circuit breadboards are tested and evaluated. This project relates to the evaluation of a particular remote power controller (RPC) energizing high power loads. The Facility equipment permits the thorough testing and evaluation of high-voltage, high-power solid-state remote power controllers. The purpose is to evaluate a Type E, 30 Ampere, 200 V dc remote power controller. Three phases of the RPC evaluation are presented. The RPC is evaluated within a low-voltage, low-power circuit to check its operational capability. The RPC is then evaluated while performing switch/circuit breaker functions within a 200 V dc, 30 Ampere power circuit. The final effort of the project relates to the recommended procedures for installing these RPC's into the existing Autonomously Managed Power System (AMPS) breadboard/test facility at MSFC.
Meeting the challenge of policy-relevant science: lessons from a water resource project
Lamb, Berton L.
1986-01-01
Water resource scientists face complex tasks in evaluating aspects of water projects, but relatively few assessment procedures have been applied and accepted as standard applications. Decision-makers often rely on environmental assessments to evaluate the value and operation of projects. There is often confusion about scientists' role in policy decisions. The scientist can affect policy-making as an expert withess, an advocate or a surrogate. By understanding the policy process, scientists can make their work more “policy relevant.” Using the Terror Lake hydro project in Alaska as a guide, three lessons are discussed: (1) not all problems are able to be solved with technology; (2) policy-relevant technology is rarely imposed on a problem; and (3) the scientist need not just react to the policy process, but can have an impact on how that process unfolds.
DOE Office of Scientific and Technical Information (OSTI.GOV)
T. Burgess; M. Noakes; P. Spampinato
This paper presents an evaluation of robotics and remote handling technologies that have the potential to increase the efficiency of handling waste packages at the proposed Yucca Mountain High-Level Nuclear Waste Repository. It is expected that increased efficiency will reduce the cost of operations. The goal of this work was to identify technologies for consideration as potential projects that the U.S. Department of Energy Office of Civilian Radioactive Waste Management, Office of Science and Technology International Programs, could support in the near future, and to assess their ''payback'' value. The evaluation took into account the robotics and remote handling capabilitiesmore » planned for incorporation into the current baseline design for the repository, for both surface and subsurface operations. The evaluation, completed at the end of fiscal year 2004, identified where significant advantages in operating efficiencies could accrue by implementing any given robotics technology or approach, and included a road map for a multiyear R&D program for improvements to remote handling technology that support operating enhancements.« less
GPU-based Branchless Distance-Driven Projection and Backprojection
Liu, Rui; Fu, Lin; De Man, Bruno; Yu, Hengyong
2017-01-01
Projection and backprojection operations are essential in a variety of image reconstruction and physical correction algorithms in CT. The distance-driven (DD) projection and backprojection are widely used for their highly sequential memory access pattern and low arithmetic cost. However, a typical DD implementation has an inner loop that adjusts the calculation depending on the relative position between voxel and detector cell boundaries. The irregularity of the branch behavior makes it inefficient to be implemented on massively parallel computing devices such as graphics processing units (GPUs). Such irregular branch behaviors can be eliminated by factorizing the DD operation as three branchless steps: integration, linear interpolation, and differentiation, all of which are highly amenable to massive vectorization. In this paper, we implement and evaluate a highly parallel branchless DD algorithm for 3D cone beam CT. The algorithm utilizes the texture memory and hardware interpolation on GPUs to achieve fast computational speed. The developed branchless DD algorithm achieved 137-fold speedup for forward projection and 188-fold speedup for backprojection relative to a single-thread CPU implementation. Compared with a state-of-the-art 32-thread CPU implementation, the proposed branchless DD achieved 8-fold acceleration for forward projection and 10-fold acceleration for backprojection. GPU based branchless DD method was evaluated by iterative reconstruction algorithms with both simulation and real datasets. It obtained visually identical images as the CPU reference algorithm. PMID:29333480
GPU-based Branchless Distance-Driven Projection and Backprojection.
Liu, Rui; Fu, Lin; De Man, Bruno; Yu, Hengyong
2017-12-01
Projection and backprojection operations are essential in a variety of image reconstruction and physical correction algorithms in CT. The distance-driven (DD) projection and backprojection are widely used for their highly sequential memory access pattern and low arithmetic cost. However, a typical DD implementation has an inner loop that adjusts the calculation depending on the relative position between voxel and detector cell boundaries. The irregularity of the branch behavior makes it inefficient to be implemented on massively parallel computing devices such as graphics processing units (GPUs). Such irregular branch behaviors can be eliminated by factorizing the DD operation as three branchless steps: integration, linear interpolation, and differentiation, all of which are highly amenable to massive vectorization. In this paper, we implement and evaluate a highly parallel branchless DD algorithm for 3D cone beam CT. The algorithm utilizes the texture memory and hardware interpolation on GPUs to achieve fast computational speed. The developed branchless DD algorithm achieved 137-fold speedup for forward projection and 188-fold speedup for backprojection relative to a single-thread CPU implementation. Compared with a state-of-the-art 32-thread CPU implementation, the proposed branchless DD achieved 8-fold acceleration for forward projection and 10-fold acceleration for backprojection. GPU based branchless DD method was evaluated by iterative reconstruction algorithms with both simulation and real datasets. It obtained visually identical images as the CPU reference algorithm.
The Lunar Mapping and Modeling Project
NASA Technical Reports Server (NTRS)
Noble, Sarah K.; French, R. A.; Nall, M. E.; Muery, K. G.
2009-01-01
The Lunar Mapping and Modeling Project (LMMP) has been created to manage the development of a suite of lunar mapping and modeling products that support the Constellation Program (CxP) and other lunar exploration activities, including the planning, design, development, test and operations associated with lunar sortie missions, crewed and robotic operations on the surface, and the establishment of a lunar outpost. The information provided through LMMP will assist CxP in: planning tasks in the areas of landing site evaluation and selection, design and placement of landers and other stationary assets, design of rovers and other mobile assets, developing terrain-relative navigation (TRN) capabilities, and assessment and planning of science traverses.
NREL: News - Hybrid Buses Operate With Lower Emissions, Greater Fuel
Evaluation Project to collect fueling, maintenance, performance and emission data from NYCT. While the hybrid buses have greater fuel economy than diesel buses, maintenance costs were significantly higher due in
Corridor-based forecasts of work-zone impacts for freeways.
DOT National Transportation Integrated Search
2011-08-09
This project developed an analysis methodology and associated software implementation for the evaluation of : significant work zone impacts on freeways in North Carolina. The FREEVAL-WZ software tool allows the analyst : to predict the operational im...
This project evaluated the effectiveness, first costs and operational costs of various types of residential ventilation systems in three different climates in the U.S. The Agency, through its Energy Star Program, recommends that builders construct homes that are energy efficient ...
ERIC Educational Resources Information Center
Spaziano, Vincent T.; Gibbons, Judith L.
1986-01-01
Describes an interdisciplinary course providing basic background in behavior, pharmacology, neuroanatomy, neurotransmitters, drugs, and specific brain disorders. Provides rationale, goals, and operational details. Discusses a research project as a tool to improve critical evaluation of science reporting and writing skills. (JM)
Development of NTCIP-based portable traffic signal evaluation system.
DOT National Transportation Integrated Search
2014-10-01
The objective of this project was to develop a custom toolbox for monitoring and troubleshooting operational : issues and faults at signalized intersections and diamond interchanges, and for providing a mechanism to : facilitate signal timing optimiz...
Demonstration Advanced Avionics System (DAAS), Phase 1
NASA Technical Reports Server (NTRS)
Bailey, A. J.; Bailey, D. G.; Gaabo, R. J.; Lahn, T. G.; Larson, J. C.; Peterson, E. M.; Schuck, J. W.; Rodgers, D. L.; Wroblewski, K. A.
1981-01-01
Demonstration advanced anionics system (DAAS) function description, hardware description, operational evaluation, and failure mode and effects analysis (FMEA) are provided. Projected advanced avionics system (PAAS) description, reliability analysis, cost analysis, maintainability analysis, and modularity analysis are discussed.
Evaluating Concrete Bridge Deck Performance
DOT National Transportation Integrated Search
2006-06-01
Since the service life of concrete bridge decks designed by traditional procedures is often shorter than desired, : their ability to withstand constant and heavy use in a variety of operating environments is of major concern. In : this project, the r...
Evaluation of Service and Methods Demonstration Projects : Philosophy and Approach
DOT National Transportation Integrated Search
1976-05-01
The Urban Mass Transportation Administration's Service and Methods Demonstration (SMD) Program has the objective of improving existing transit operations by sponsoring the development and implementation of new techniques and services on a nation-wide...
Helical screw expander evaluation project
NASA Technical Reports Server (NTRS)
Mckay, R.
1982-01-01
A one MW helical rotary screw expander power system for electric power generation from geothermal brine was evaluated. The technology explored in the testing is simple, potentially very efficient, and ideally suited to wellhead installations in moderate to high enthalpy, liquid dominated field. A functional one MW geothermal electric power plant that featured a helical screw expander was produced and then tested with a demonstrated average performance of approximately 45% machine efficiency over a wide range of test conditions in noncondensing, operation on two-phase geothermal fluids. The Project also produced a computer equipped data system, an instrumentation and control van, and a 1000 kW variable load bank, all integrated into a test array designed for operation at a variety of remote test sites. Data are presented for the Utah testing and for the noncondensing phases of the testing in Mexico. Test time logged was 437 hours during the Utah tests and 1101 hours during the Mexico tests.
ERIC Educational Resources Information Center
McKinlay, Bruce; Adams, Daniel
The Occupational Information Access System (OIAS) improves the accessibility of occupational labor market information for career planning. Its operation at Churchill High School is evaluated from several angels: the likes and dislikes of users; the effect of OIAS on users' knowledge of occupational information and on their career plans; why other…
Considered Evaluation of Clinical Placements in a New Medical School
ERIC Educational Resources Information Center
Booth, Jerry; Collins, Sarah; Hammond, Anna
2009-01-01
This article suggests that quality assessment in the UK has been largely set apart from learning and teaching and reports on a pilot project at the Hull York Medical School which attempted to integrate students' evaluation of their clinical placements into the curriculum. It outlines the operational demands of this integrated method and compares…
Refractory Metal Heat Pipe Life Test - Test Plan and Standard Operating Procedures
NASA Technical Reports Server (NTRS)
Martin, J. J.; Reid, R. S.
2010-01-01
Refractory metal heat pipes developed during this project shall be subjected to various operating conditions to evaluate life-limiting corrosion factors. To accomplish this objective, various parameters shall be investigated, including the effect of temperature and mass fluence on long-term corrosion rate. The test series will begin with a performance test of one module to evaluate its performance and to establish the temperature and power settings for the remaining modules. The performance test will be followed by round-the-clock testing of 16 heat pipes. All heat pipes shall be nondestructively inspected at 6-month intervals. At longer intervals, specific modules will be destructively evaluated. Both the nondestructive and destructive evaluations shall be coordinated with Los Alamos National Laboratory. During the processing, setup, and testing of the heat pipes, standard operating procedures shall be developed. Initial procedures are listed here and, as hardware is developed, will be updated, incorporating findings and lessons learned.
DOE Office of Scientific and Technical Information (OSTI.GOV)
MACKEY, T.C.
2006-03-17
This report documents a detailed buckling evaluation of the primary tanks in the Hanford double shell waste tanks. The analysis is part of a comprehensive structural review for the Double-Shell Tank Integrity Project. This work also provides information on tank integrity that specifically responds to concerns raise by the Office of Environment, Safety, and Health (ES&H) Oversight (EH-22) during a review (in April and May 2001) of work being performed on the double-shell tank farms, and the operation of the aging waste facility (AWF) primary tank ventilation system.
Nursing Project Management to Reduce the Operating Room Infection.
Chen, Yuanyuan; Han, Xiaodao; Xu, Yongjie; Li, Weihua
2017-02-01
Nursing project management is widely used in different aspects of the society. However, whether the nursing project management can control the infections in the operation room (OR) is rarely reported. We evaluated the outcomes of surgical patients after implementing a nursing project management program to provide new scientific ways to manage the OR infections. Overall, 382 patients, who underwent surgical treatment in Qilu Hospital of Shandong University, Shandong, China from May 2015 to January 2016, were enrolled as observation group. Besides, 347 cases were selected as control group. Patients in the observation group were treated with the nursing project management plan, while patients in the control group were treated with the routine operation-room nursing measures. The infection control rates in the OR, and the patient satisfaction with the nursing team postoperatively were both compared between the two groups of patients. The OR air, the surgical and personnel's hands surfaces were sampled for colony forming units, and all were found to be significantly of better quality (indicated by less colony forming units) in the observation group (P<0.001). In addition, there were 3 cases (0.79%) of post-operation infections in the observation group, while 12 cases (3.46%) occurred in the control group. The overall infection rate of the observation group was significantly lower than that of the control group (P = 0.011); and the satisfaction of patients with the nursing team in the observation group was significantly higher than that of the patients in the control group ( P = 0.001). It is worth popularizing and applying a good nursing project management plan for surgical patients in hospitals.
Evaluation and improvement of the inquest system on work accidents (TOT)
NASA Astrophysics Data System (ADS)
Lepistoe, Jukka
1992-11-01
A project to evaluate and improve the work accident inquest system TOT (Finnish acronym) is reported. The study began with visits to workplaces where mortal accidents had occurred. Inquest reports, accident information dissemination, and the use of inquest reports, were examined. The study showed that work-related accidental deaths had a warning value, due to the gravity of the event, that could be exploited in the prevention field. The inquest system was shown to operate stably, all elements operating at least satisfactorily, and no improvement objective could be distinguished as more urgent than another. Improvement possibilities in the general system operation and in the capacity of workplaces to use inquest reports were shown.
ERIC Educational Resources Information Center
Wideman, Marilyn E.
This document contains an internal investigation of students' self-esteem in the Scarborough, Ontario school sytem undertaken because of the emphasis that the school system places on students' self-esteem as a predictor of academic achievement. A chapter on the research plan presents descriptions of the population, sample selection, choice of…
ERIC Educational Resources Information Center
Losh, Charles
The Electronics Industries Foundation was awarded a project to develop national entry-level standards and a certification system. Ten specialties were included: automotive electronics, avionics, biomedical electronics, business machines, consumer products electronics, general electronics, industrial electronics, instrumentation, microcomputer, and…
1984-12-01
operating results (income statement) and financial condition ( balance sheet) are developed. From this data, stabilized rates are developed and adjusted to...funding budgets based on projected workloads developed at workload conferences. The workload subsystem distributes and balances projected manhours at...is the validation criteria. However, any account with a credit balance is deleted from the UCA data which causes a minor but identifiable
NASA Astrophysics Data System (ADS)
Moschini, Elena
Academics are beginning to explore the educational potential of Second LifeTM (SL) by setting up inworld educational activities and projects. Given the relative novelty of the use of virtual world environments in higher education many such projects are still at pilot stage. However the initial pilot and experimentation stage will have to be followed by a rigorous evaluation process as for more traditional teaching projects. The chapter addresses issues about SL research tools and research methods. It introduces a "researcher toolkit" that includes: the various stages in the evaluation of SL educational projects and the theoretical framework that can inform such projects; an outline of the inworld tools that can be utilised or customised for academic research purposes; a review of methods for collecting feedback from participants and of the main ethical issues involved in researching virtual world environments; a discussion on the technical skills required to operate a research project in SL. The chapter also offers an indication of the inworld opportunities for the dissemination of SL research findings.
NASA Astrophysics Data System (ADS)
Zhou, S. Y.; Zhang, B.; Cai, Z. F.
2010-05-01
This paper aims to present a biophysical understanding of the agricultural ecological engineering by emergy analysis for a farm biogas project in China as a representative case. Accounting for the resource inputs into and accumulation within the project, as well as the outputs to the social system, emergy analysis provides an empirical study in the biophysical dimension of the agricultural ecological engineering. Economic benefits and ecological economic benefits of the farm biogas project indicated by market value and emergy monetary value are discussed, respectively. Relative emergy-based indices such as renewability (R%), emergy yield ratio (EYR), environmental load ratio (ELR) and environmental sustainability index (ESI) are calculated to evaluate the environmental load and local sustainability of the concerned biogas project. The results show that the farm biogas project has more reliance on the local renewable resources input, less environmental pressure and higher sustainability compared with other typical agricultural systems. In addition, holistic evaluation and its policy implications for better operation and management of the biogas project are presented.
Test development for the thermionic system evaluation test (TSET) project
NASA Astrophysics Data System (ADS)
Morris, D. Brent; Standley, Vaughn H.; Schuller, Michael J.
1992-01-01
The arrival of a Soviet TOPAZ-II space nuclear reactor affords the US space nuclear power (SNP) community the opportunity to study an assembled thermionic conversion power system. The TOPAZ-II will be studied via the Thermionic System Evaluation Test (TSET) Project. This paper is devoted to the discussion of TSET test development as related to the objectives contained in the TSET Project Plan (Standley et al. 1991). The objectives contained in the Project Plan are the foundation for scheduled TSET tests on TOPAZ-II and are derived from the needs of the Air Force Thermionic SNP program. Our ability to meet the objectives is bounded by unique constraints, such as procurement requirements, operational limitations, and necessary interaction between US and Soviet Scientists and engineers. The fulfillment of the test objectives involves a thorough methodology of test scheduling and data managment. The overall goals for the TSET program are gaining technical understanding of a thermionic SNP system and demonstrating the capabilities and limitations of such a system while assisting in the training of US scientist and engineers in preparation for US SNP system testing. Tests presently scheduled as part of TSET include setup, demonstration, and verification tests; normal and off-normal operating test, and system and component performance tests.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peters, E.W.; Matthews, N.P.
1987-10-01
The intent of this project was to develop, demonstrate and evaluate marketing techniques for the establishment of ridesharing corporations in New York State. The objectives of the first phase of the project were to: (1) develop a ''how-to'' guide for establishing a ridesharing corporation; and (2) conduct a market assessment to identify specific methods for capturing potential users of the service. The objectives of the second phase of the project were to: (1) prepare and implement a marketing strategy to address the various major users and evaluate the viability of new marketing techniques developed in Phase 1 and marketing techniquesmore » developed during the first year of operations; and (2) develop and disseminate a ''how-to'' guide regarding the development, implementation and evaluation of marketing strategies for ridesharing in New York State.« less
Microsoft Kinect Sensor Evaluation
NASA Technical Reports Server (NTRS)
Billie, Glennoah
2011-01-01
My summer project evaluates the Kinect game sensor input/output and its suitability to perform as part of a human interface for a spacecraft application. The primary objective is to evaluate, understand, and communicate the Kinect system's ability to sense and track fine (human) position and motion. The project will analyze the performance characteristics and capabilities of this game system hardware and its applicability for gross and fine motion tracking. The software development kit for the Kinect was also investigated and some experimentation has begun to understand its development environment. To better understand the software development of the Kinect game sensor, research in hacking communities has brought a better understanding of the potential for a wide range of personal computer (PC) application development. The project also entails the disassembly of the Kinect game sensor. This analysis would involve disassembling a sensor, photographing it, and identifying components and describing its operation.
Mod-2 wind turbine system development. Volume 2: Detailed report
NASA Technical Reports Server (NTRS)
1982-01-01
Progress in the design, fabrication, and testing of a wind turbine system is reported. The development of the MOD-2 wind turbine through acceptance testing and initial operational evaluation is documented. The MOD-2 project intends to develop early commercialization of wind energy. The first wind turbine farm (three MOD-2 units) are now being operated at the Bonneville Power Administration site near Goldendale, Washington.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-02-01
This report contains questions and comments regarding a risk evaluation and possible remedial action of Operable Unit 4 at the Feed Materials Production Center at Fernald, Ohio. Attention is focused on the US EPA Region V feasibility study and on the CRARE. The CRARE is a post-remediation time frame document.
NASA Astrophysics Data System (ADS)
Ireland, Gareth; North, Matthew R.; Petropoulos, George P.; Srivastava, Prashant K.; Hodges, Crona
2015-04-01
Acquiring accurate information on the spatio-temporal variability of soil moisture content (SM) and evapotranspiration (ET) is of key importance to extend our understanding of the Earth system's physical processes, and is also required in a wide range of multi-disciplinary research studies and applications. The utility and applicability of Earth Observation (EO) technology provides an economically feasible solution to derive continuous spatio-temporal estimates of key parameters characterising land surface interactions, including ET as well as SM. Such information is of key value to practitioners, decision makers and scientists alike. The PREMIER-EO project recently funded by High Performance Computing Wales (HPCW) is a research initiative directed towards the development of a better understanding of EO technology's present ability to derive operational estimations of surface fluxes and SM. Moreover, the project aims at addressing knowledge gaps related to the operational estimation of such parameters, and thus contribute towards current ongoing global efforts towards enhancing the accuracy of those products. In this presentation we introduce the PREMIER-EO project, providing a detailed overview of the research aims and objectives for the 1 year duration of the project's implementation. Subsequently, we make available the initial results of the work carried out herein, in particular, related to an all-inclusive and robust evaluation of the accuracy of existing operational products of ET and SM from different ecosystems globally. The research outcomes of this project, once completed, will provide an important contribution towards addressing the knowledge gaps related to the operational estimation of ET and SM. This project results will also support efforts ongoing globally towards the operational development of related products using technologically advanced EO instruments which were launched recently or planned be launched in the next 1-2 years. Key Words: PREMIER-EO, HPC Wales, Soil Moisture, Evapotranspiration, , Earth Observation
González, Eduardo; Sher, Anna A; Tabacchi, Eric; Masip, Adrià; Poulin, Monique
2015-08-01
We examined how restoration of riparian vegetation has been implemented and evaluated in the scientific literature during the past 25 years. A total of 169 papers were read systematically to extract information about the following: 1) restoration strategies applied, 2) scale of monitoring and use of reference sites, 3) metrics used for evaluation, and 4) drivers of success. Hydro-geomorphic approaches (e.g., dam operations, controlled floods, landform reconfiguration) were the most frequent, followed by active plant introduction, exotic species control, natural floodplain conversion and grazing and herbivory control. Our review revealed noteworthy limitations in the spatio-temporal approaches chosen for evaluation. Evaluations were mostly from one single project and frequently ignored the multi-dimensional nature of rivers: landscape spatial patterns were rarely assessed, and most projects were assessed locally (i.e., ≤meander scale). Monitoring rarely lasted for more than six years and the projects evaluated were usually not more than six years old. The impact of the restoration was most often (43%) assessed by tracking change over time rather than by comparing restored sites to unrestored and reference sites (12%), and few projects (30%) did both. Among the ways which restoration success was evaluated, vegetation structure (e.g., abundance, density, etc.) was assessed more often (152 papers) than vegetation processes (e.g., biomass accumulation, survival, etc.) (112 papers) and vegetation diversity (78 papers). Success was attributed to hydro-geomorphic factors in 63% of the projects. Future evaluations would benefit from incorporating emerging concepts in ecology such as functional traits to assess recovery of functionality, more rigorous experimental designs, enhanced comparisons among projects, longer term monitoring and reporting failure. Copyright © 2015 Elsevier Ltd. All rights reserved.
Kouri, Pirkko; Karjalainen-Jurvelin, Ritva; Kinnunen, Juha
2005-12-01
When developing Information and Communication Technology (ICT), such as services for the decision-making process, skilled health care professionals with their comprehensive knowledge of patients/clients are essential contributors to the project. Careful evaluation is needed to assess the effectiveness of project management as well as to analyze the commitment of the personnel to goal attainment. In the course of the development of integrated maternity care services, the commitment of project participants (n=48) was evaluated. What factors enhanced or impaired their commitment to the project work? Questionnaire (n=80, response rate 60%) with quantitative analysis as well as open-ended questions with qualitative content analysis. Positive commitment was related to a confidential and open atmosphere during the project. The utilization of personal skills and experience was appreciated. Differences in the working principles and cultures between the participating organizations complicated fluent collaboration. To encourage commitment, a lot of attention should be paid to internal communication as well as the effective realization of project tasks. The strength of the project was the highly innovative and confidential atmosphere. The well-established project goals, the highly inspired project team, and the effective co-operation between the project manager and the core group helped to deepen overall commitment in the project.
Laing, Gabrielle; Aragrande, Maurizio; Canali, Massimo; Savic, Sara; De Meneghi, Daniele
2018-01-01
One health thinking for health interventions is increasingly being used to capture previously unseen stakeholders and impacts across people, animals, and the environment. The Network for One Health Evaluation (NEOH) proposes a systems-based framework to quantitatively assess integration and highlight the added value (theory of change) that this approach will bring to a project. This case study will retrospectively evaluate the pioneering use of a One Health (OH) approach during an international collaboration (satellite project to tackle production losses due to tick-borne disease in cattle in Southern Zambia in late 1980s). The objective of the evaluation is twofold: retrospective evaluation the OH-ness of the satellite project and identification of costs and benefits. Data for evaluation was recovered from publications, project documents, and witness interviews. A mixed qualitative and quantitative evaluation was undertaken. In this case study, a transdisciplinary approach allowed for the identification of a serious public health risk arising from the unexpected reuse of chemical containers by the local public against advice. Should this pioneering project not have been completed then it is assumed this behavior could have had a large impact on public wellbeing and ultimately reduced regional productivity and compromised welfare. From the economic evaluation, the costs of implementing this OH approach, helping to avoid harm, were small in comparison to overall project costs. The overall OH Index was 0.34. The satellite project demonstrated good OH operations by managing to incorporate the input across multiple dimensions but was slightly weaker on OH infrastructures (OH Ratio = 1.20). These quantitative results can be used in the initial validation and benchmarking of this novel framework. Limitations of the evaluation were mainly a lack of data due to the length of time since project completion and a lack of formal monitoring of program impact. In future health strategy development and execution, routine monitoring and evaluation from an OH perspective (by utilizing the framework proposed by NEOH), could prove valuable or used as a tool for retrospective evaluation of existing policies.
Evaluation Plan for the Cape Cod Advanced Public Transportation System
DOT National Transportation Integrated Search
2000-06-01
The Cape Cod Regional Transit Authority (CCRTA) Advanced Public Transportation System (APTS) project is an application of Intelligent Transportation Systems (ITS) to fixed route and paratransit operations in a rural transit setting. The purpose of th...
EVALUATION PLAN FOR TWO LARGE-SCALE LANDFILL BIOREACTOR TECHNOLOGIES
Abstract - Waste Management, Inc., is operating two long-term bioreactor studies at the Outer Loop Landfill in Louisville, KY, including facultative landfill bioreactor and staged aerobic-anaerobic landfill bioreactor demonstrations. A Quality Assurance Project Plan (QAPP) was p...
Evaluating cell phone data for AADT estimation : research project capsule.
DOT National Transportation Integrated Search
2016-04-01
Annual average daily traffic (AADT) is a key input in a transportation agencys roadway : planning, design, operation, and maintenance activities, including air quality and : safety assessments. AADT is required to be reported annually by a state...
EVALUATION OF REFRIGERANT FROM MOBILE AIR CONDITIONERS
The report gives results of a project to provide a scientific basis for choosing a reasonable standard of purity for recycled chlorofluorocarbon (CFC) refrigerant in operating automobile air conditioners. The quality of refrigerant from air conditioners in automobiles of differen...
Evaluation of hot in-place recycle.
DOT National Transportation Integrated Search
2010-06-01
This report documents the construction of hot in-place recycled (HIPR) pavement on SR 542. : HIPR is a process by which rehabilitation of the existing HMA pavement occurs on site in one : operation. HIPR project selection, mix design, construction an...
New York state proof-of-concept project one stop credentialing and registration
DOT National Transportation Integrated Search
2001-01-01
The I-95 Corridor Coalition initially awarded funding for the development of electronic credentialing systems for commercial vehicle operations to five states: New York, New Jersey, Pennsylvania, Delaware, and Massachusetts. The initial evaluation of...
Bridge deck concrete volume change : final contract report.
DOT National Transportation Integrated Search
2010-02-01
Concrete structures such as bridge decks, with large surface area relative to volume, shrink and crack, thus reducing service life performance and increasing operation costs. The project evaluated the early, first 24 hours, and long-term, 180 days, s...
Applied Meteorology Unit - Operational Contributions to Spaceport Canaveral
NASA Technical Reports Server (NTRS)
Bauman, William H., III; Roeder, William P.; Lafosse, Richard A.; Sharp, David W.; Merceret, Francis J.
2004-01-01
The Applied Meteorology Unit (AMU) provides technology development, evaluation and transition services to improve operational weather support to the Space Shuttle and the National Space Program. It is established under a Memorandum of Understanding among NASA, the Air Force and the National .Weather Service (NWS). The AMU is funded and managed by NASA and operated by ENSCO, Inc. through a competitively awarded NASA contract. The primary customers are the 45th Weather Squadron (45WS) at Cape Canaveral Air Force Station (CCAFS), FL; the Spaceflight Meteorology Group (SMG) at Johnson Space Center (JSC) in Houston, TX; and the NWS office in Melbourne, FL (NWS MLB). This paper will briefly review the AMU's history and describe the three processes through which its work is assigned. Since its inception in 1991 the AMU has completed 72 projects, all of which are listed at the end of this paper. At least one project that highlights each of the three tasking processes will be briefly reviewed. Some of the projects that have been especially beneficial to the space program will also be discussed in more detail, as will projects that developed significant new techniques or science in applied meteorology.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hinton, W.S.; Maxwell, J.D.; Healy, E.C.
1997-12-31
This paper describes the completed Innovative Clean Coal Technology project which demonstrated SCR technology for reduction of flue gas NO{sub x} emissions from a utility boiler burning US high-sulfur coal. The project was sponsored by the US Department of Energy, managed and co-funded by Southern Company Services, Inc. on behalf of the Southern Company, and also co-funded by the Electric Power Research Institute and Ontario Hydro. The project was located at Gulf Power Company`s Plant Crist Unit 5 (a 75 MW tangentially-fired boiler burning US coals that had a sulfur content ranging from 2.5--2.9%), near Pensacola, Florida. The test programmore » was conducted for approximately two years to evaluate catalyst deactivation and other SCR operational effects. The SCR test facility had nine reactors: three 2.5 MW (5,000 scfm), and operated on low-dust flue gas. The reactors operated in parallel with commercially available SCR catalysts obtained from suppliers throughout the world. Long-term performance testing began in July 1993 and was completed in July 1995. A brief test facility description and the results of the project are presented in this paper.« less
Plan for CELSS test bed project
NASA Technical Reports Server (NTRS)
Knott, W. M.
1986-01-01
The Closed Ecological Life Support Systems (CELSS) testbed project will achieve two major goals: It will develop the knowledge and technology needed to build and test biological or combined biological physiochemical regenerative life support systems. It will fabricate, test, and operate ground based facilities to accomplish proof-of-concent testing and evaluation leading to flight experimentation. The project will combine basic research and applied research/engineering to achieve a phased, integrated development of hardware, systems, and techniques for food and oxygen production, food processing, and waste processing in closed systems. The project will design, fabricate, and operate within three years a botanical production system scaled to a sufficient size to verify oxygen and nutrient load production (carbohydrates, fats, proteins) at a useable level. It will develop within five years a waste management system compatible with the botanical production system and a food processing system that converts available biomass into edible products. It will design, construct, and operate within ten years a ground based candidate CELSS that includes man as an active participant in the system. It will design a flight CELSS module within twelve years and construct and conduct initial flight tests within fifteen years.
Classification of US hydropower dams by their modes of operation
McManamay, Ryan A.; Oigbokie, II, Clement O.; Kao, Shih -Chieh; ...
2016-02-19
A key challenge to understanding ecohydrologic responses to dam regulation is the absence of a universally transferable classification framework for how dams operate. In the present paper, we develop a classification system to organize the modes of operation (MOPs) for U.S. hydropower dams and powerplants. To determine the full diversity of MOPs, we mined federal documents, open-access data repositories, and internet sources. W then used CART classification trees to predict MOPs based on physical characteristics, regulation, and project generation. Finally, we evaluated how much variation MOPs explained in sub-daily discharge patterns for stream gages downstream of hydropower dams. After reviewingmore » information for 721 dams and 597 power plants, we developed a 2-tier hierarchical classification based on 1) the storage and control of flows to powerplants, and 2) the presence of a diversion around the natural stream bed. This resulted in nine tier-1 MOPs representing a continuum of operations from strictly peaking, to reregulating, to run-of-river, and two tier-2 MOPs, representing diversion and integral dam-powerhouse configurations. Although MOPs differed in physical characteristics and energy production, classification trees had low accuracies (<62%), which suggested accurate evaluations of MOPs may require individual attention. MOPs and dam storage explained 20% of the variation in downstream subdaily flow characteristics and showed consistent alterations in subdaily flow patterns from reference streams. Lastly, this standardized classification scheme is important for future research including estimating reservoir operations for large-scale hydrologic models and evaluating project economics, environmental impacts, and mitigation.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boe, Stephen J.; Ogburn, Parker N.
2003-03-01
This is the second annual report of a multi-year project to operate adult collection and juvenile acclimation facilities on Catherine Creek and the upper Grande Ronde River for Snake River spring chinook salmon. These two streams have historically supported populations that provided significant tribal and non-tribal fisheries. Supplementation using conventional and captive broodstock techniques is being used to restore fisheries in these streams. Statement of Work Objectives for 2001: (1) Participate in implementation of the comprehensive multiyear operations plan for the Grande Ronde Endemic Spring chinook Supplementation Program (GRESCP). (2) Plan detailed GRESCP Monitoring and Evaluation for future years. (3)more » Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2001. (4) Plan for data collection needs for bull trout. (5) Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2001. (6) Collect summer steelhead. (7) Monitor adult endemic spring chinook salmon populations and collect broodstock. (8) Acclimate juvenile spring chinook salmon prior to release into the upper Grande Ronde River and Catherine Creek. (9) Monitor adult population abundance and characteristics of Grande Ronde River spring chinook salmon populations. (10) Monitor condition, movement, and mortality of spring chinook salmon acclimated at remote facilities. (11) Participate in Monitoring & Evaluation of the captive brood component of the Program to document contribution to the Program. (12) Monitor water quality at facilities. (13) Document accomplishments and needs to permitters, comanagers, and funding agencies. (14) Communicate Project results to the scientific community.« less
Classification of US hydropower dams by their modes of operation
DOE Office of Scientific and Technical Information (OSTI.GOV)
McManamay, Ryan A.; Oigbokie, II, Clement O.; Kao, Shih -Chieh
A key challenge to understanding ecohydrologic responses to dam regulation is the absence of a universally transferable classification framework for how dams operate. In the present paper, we develop a classification system to organize the modes of operation (MOPs) for U.S. hydropower dams and powerplants. To determine the full diversity of MOPs, we mined federal documents, open-access data repositories, and internet sources. W then used CART classification trees to predict MOPs based on physical characteristics, regulation, and project generation. Finally, we evaluated how much variation MOPs explained in sub-daily discharge patterns for stream gages downstream of hydropower dams. After reviewingmore » information for 721 dams and 597 power plants, we developed a 2-tier hierarchical classification based on 1) the storage and control of flows to powerplants, and 2) the presence of a diversion around the natural stream bed. This resulted in nine tier-1 MOPs representing a continuum of operations from strictly peaking, to reregulating, to run-of-river, and two tier-2 MOPs, representing diversion and integral dam-powerhouse configurations. Although MOPs differed in physical characteristics and energy production, classification trees had low accuracies (<62%), which suggested accurate evaluations of MOPs may require individual attention. MOPs and dam storage explained 20% of the variation in downstream subdaily flow characteristics and showed consistent alterations in subdaily flow patterns from reference streams. Lastly, this standardized classification scheme is important for future research including estimating reservoir operations for large-scale hydrologic models and evaluating project economics, environmental impacts, and mitigation.« less
Meeting the challenge of policy-relevant science: lessons from a water resource project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lamb, B.L.
Water resources scientists face complex tasks in evaluating aspects of water projects, but relatively few assessment procedures have been applied and accepted as standards applications. Decision-makers often rely on environmental assessments to evaluate the value and operation of projects. There is often confusion about scientists' role in policy decisions. The scientist can affect policy-making as an expert witness, an advocate or a surrogate. By understanding the policy process, scientists can make their work more policy relevant. Using the Terror Lake hydro project in Alaska as a guide, three lessons are discussed: (1) not all problems are able to be solvedmore » with technology; (2) policy-relevant technology is rarely imposed on a problem; and (3) the scientist need not just to react to the policy process, but can have an impact on how that process unfolds.« less
Development and Testing of an UltraBattery-Equipped Honda Civic Hybrid
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sally; Tyler Gray; Pattie Hovorka
2012-08-01
The UltraBattery Retrofit Project DP1.8 and Carbon Enriched Project C3, performed by ECOtality North America (ECOtality) and funded by the U.S. Department of Energy and the Advanced Lead Acid Battery Consortium (ALABC), are established to demonstrate the suitability of advanced lead battery technology in hybrid electrical vehicles (HEVs). A profile, termed the “Simulated Honda Civic HEV Profile” (SHCHEVP) has been developed in Project DP1.8 in order to provide reproducible laboratory evaluations of different battery types under real-world HEV conditions. The cycle is based on the Urban Dynamometer Driving Schedule and Highway Fuel Economy Test cycles and simulates operation of amore » battery pack in a Honda Civic HEV. One pass through the SHCHEVP takes 2,140 seconds and simulates 17.7 miles of driving. A complete nickel metal hydride (NiMH) battery pack was removed from a Honda Civic HEV and operated under SHCHEVP to validate the profile. The voltage behavior and energy balance of the battery during this operation was virtually the same as that displayed by the battery when in the Honda Civic operating on the dynamometer under the Urban Dynamometer Driving Schedule and Highway Fuel Economy Test cycles, thus confirming the efficacy of the simulated profile. An important objective of the project has been to benchmark the performance of the UltraBatteries manufactured by both Furukawa Battery Co., Ltd., Japan (Furakawa) and East Penn Manufacturing Co., Inc. (East Penn). Accordingly, UltraBattery packs from both Furakawa and East Penn have been characterized under a range of conditions. Resistance measurements and capacity tests at various rates show that both battery types are very similar in performance. Both technologies, as well as a standard lead-acid module (included for baseline data), were evaluated under a simple HEV screening test. Both Furakawa and East Penn UltraBattery packs operated for over 32,000 HEV cycles, with minimal loss in performance; whereas the standard lead-acid unit experienced significant degradation after only 6,273 cycles. The high-carbon, ALABC battery manufactured in Project C3 also was tested under the advanced HEV schedule. Its performance was significantly better than the standard lead-acid unit, but was still inferior compared with the UltraBattery. The batteries supplied by Exide as part of the C3 Project performed well under the HEV screening test, especially at high temperatures. The results suggest that higher operating temperatures may improve the performance of lead-acid-based technologies operated under HEV conditions—it is recommended that life studies be conducted on these technologies under such conditions.« less
Putting the environment into the NPV calculation -- Quantifying pipeline environmental costs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dott, D.R.; Wirasinghe, S.C.; Chakma, A.
1996-12-31
Pipeline projects impact the environment through soil and habitat disturbance, noise during construction and compressor operation, river crossing disturbance and the risk of rupture. Assigning monetary value to these negative project consequences enables the environment to be represented in the project cost-benefit analysis. This paper presents the mechanics and implications of two environmental valuation techniques: (1) the contingent valuation method and (2) the stated preference method. The use of environmental value at the project economic-evaluation stage is explained. A summary of research done on relevant environmental attribute valuation is presented and discussed. Recommendations for further research in the field aremore » made.« less
Enhancing water quality in hydropower system operations
NASA Astrophysics Data System (ADS)
Hayes, Donald F.; Labadie, John W.; Sanders, Thomas G.; Brown, Jackson K.
1998-03-01
The quality of impounded waters often degrades over time because of thermal stratification, sediment oxygen demands, and accumulation of pollutants. Consequently, reservoir releases impact water quality in tailwaters, channels, and other downstream water bodies. Low dissolved oxygen (DO) concentrations in the Cumberland River below Old Hickory dam result from stratification of upstream reservoirs and seasonally low release rates. Operational changes in upstream hydropower reservoirs may be one method to increase DO levels without substantially impacting existing project purposes. A water quality model of the upper Cumberland basin is integrated into an optimal control algorithm to evaluate water quality improvement opportunities through operational modifications. The integrated water quantity/quality model maximizes hydropower revenues, subject to various flow and headwater operational restrictions for satisfying multiple project purposes, as well as maintenance of water quality targets. Optimal daily reservoir release policies are determined for the summer drawdown period which increase DO concentrations under stratification conditions with minimal impact on hydropower production and other project purposes. Appendixes A-D available with entire article on microfiche. Order by mail from AGU, 2000 Florida Ave., N.W., Washington, DC 20009 or by phone at 800-966-2481; $2.50. Document W97-003. Payment must accompany order.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Goodman, Lynne S.
'Money makes the world go round', as the song says. It definitely influences decommissioning decision-making and financial assurance for future decommissioning. This paper will address two money-related decommissioning topics. The first is the evaluation of whether to continue or to halt decommissioning activities at Fermi 1. The second is maintaining adequacy of financial assurance for future decommissioning of operating plants. Decommissioning costs considerable money and costs are often higher than originally estimated. If costs increase significantly and decommissioning is not well funded, decommissioning activities may be deferred. Several decommissioning projects have been deferred when decision-makers determined future spending is preferablemore » than current spending, or when costs have risen significantly. Decommissioning activity timing is being reevaluated for the Fermi 1 project. Assumptions for waste cost-escalation significantly impact the decision being made this year on the Fermi 1 decommissioning project. They also have a major impact on the estimated costs for decommissioning currently operating plants. Adequately funding full decommissioning during plant operation will ensure that the users who receive the benefit pay the full price of the nuclear-generated electricity. Funding throughout operation also will better ensure that money is available following shutdown to allow decommissioning to be conducted without need for additional funds.« less
ERIC Educational Resources Information Center
Benford, John Q.
Phase IV of the Student Library Resource Requirements Project had as its two main purposes: (1) the establishment of a student learning center demonstration, with the collaboration of school and public library organizations and to begin its operation and evaluation and (2) to expand the well-established interagency planning mechanism into other…
Final Test and Evaluation Results from the Solar Two Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
BRADSHAW, ROBERT W.; DAWSON, DANIEL B.; DE LA ROSA, WILFREDO
Solar Two was a collaborative, cost-shared project between 11 U. S. industry and utility partners and the U. S. Department of Energy to validate molten-salt power tower technology. The Solar Two plant, located east of Barstow, CA, comprised 1926 heliostats, a receiver, a thermal storage system, a steam generation system, and steam-turbine power block. Molten nitrate salt was used as the heat transfer fluid and storage media. The steam generator powered a 10-MWe (megawatt electric), conventional Rankine cycle turbine. Solar Two operated from June 1996 to April 1999. The major objective of the test and evaluation phase of the projectmore » was to validate the technical characteristics of a molten salt power tower. This report describes the significant results from the test and evaluation activities, the operating experience of each major system, and overall plant performance. Tests were conducted to measure the power output (MW) of the each major system, the efficiencies of the heliostat, receiver, thermal storage, and electric power generation systems and the daily energy collected, daily thermal-to-electric conversion, and daily parasitic energy consumption. Also included are detailed test and evaluation reports.« less
NASA Astrophysics Data System (ADS)
Plaksina, Tatyana; Kanfar, Mohammed
2017-11-01
With growing interest in commercial projects involving industrial volume CO2 sequestration, a concern about proper containment and control over the gas plume becomes particularly prominent. In this study, we explore the potential of using a typical coastal geopressured hot saline aquifer for two commercial purposes. The first purpose is to harvest geothermal heat of the aquifer for electricity generation and/or direct use and the second one is to utilize the same rock volume for safe and controlled CO2 sequestration without interruption of heat production. To achieve these goals, we devised and economically evaluated a scheme that recovers operational and capital costs within first 4 years and yields positive internal rate of return of about 15% at the end of the operations. Using our strategic design of well placement and operational scheduling, we were able to achieve in our numerical simulation study the following results. First, the hot water production rates allowed to run a 30 MW organic Rankine cycle plant for 20 years. Second, during the last 10 years of operation we managed to inject into the same reservoir (volume of 0.8 x 109 m3) approximately 10 million ton of the supercritical gas. Third, decades of numerical monitoring the plume after the end of the operations showed that this large volume of CO2 is securely sequestrated inside the reservoir without compromising the caprock integrity.
Wake Vortex Advisory System (WakeVAS) Evaluation of Impacts on the National Airspace System
NASA Technical Reports Server (NTRS)
Smith, Jeremy C.; Dollyhigh, Samuel M.
2005-01-01
This report is one of a series that describes an ongoing effort in high-fidelity modeling/simulation, evaluation and analysis of the benefits and performance metrics of the Wake Vortex Advisory System (WakeVAS) Concept of Operations being developed as part of the Virtual Airspace Modeling and Simulation (VAMS) project. A previous study, determined the overall increases in runway arrival rates that could be achieved at 12 selected airports due to WakeVAS reduced aircraft spacing under Instrument Meteorological Conditions. This study builds on the previous work to evaluate the NAS wide impacts of equipping various numbers of airports with WakeVAS. A queuing network model of the National Airspace System, built by the Logistics Management Institute, Mclean, VA, for NASA (LMINET) was used to estimate the reduction in delay that could be achieved by using WakeVAS under non-visual meteorological conditions for the projected air traffic demand in 2010. The results from LMINET were used to estimate the total annual delay reduction that could be achieved and from this, an estimate of the air carrier variable operating cost saving was made.
American Fuel Cell Bus Project Evaluation. Second Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eudy, Leslie; Post, Matthew
2015-09-01
This report presents results of the American Fuel Cell Bus (AFCB) Project, a demonstration of fuel cell electric buses operating in the Coachella Valley area of California. The prototype AFCB was developed as part of the Federal Transit Administration's (FTA's) National Fuel Cell Bus Program. Through the non-profit consortia CALSTART, a team led by SunLine Transit Agency and BAE Systems developed a new fuel cell electric bus for demonstration. SunLine added two more AFCBs to its fleet in 2014 and another in 2015. FTA and the AFCB project team are collaborating with the U.S. Department of Energy (DOE) and DOE'smore » National Renewable Energy Laboratory to evaluate the buses in revenue service. This report summarizes the performance results for the buses through June 2015.« less
Comparison and selection of off-grid PV systems
NASA Astrophysics Data System (ADS)
Izmailov, Andrey Yu.; Lobachevsky, Yakov P.; Shepovalova, Olga V.
2018-05-01
This work deals with comparison, evaluation and selection of PV systems of the same type based on their technical parameters either indicated in their technical specifications or calculated ones. Stand-alone and grid backed up photoelectric systems have been considered. General requirements for photoelectric system selection and evaluation have been presented that ensure system operability and required efficiency in operation conditions. Generic principles and definition of photoelectric systems characteristics have been considered. The described method is mainly targeted at PV engineering personnel and private customers purchasing PV systems. It can be also applied in the course of project contests, tenders, etc.
Power Electronics Thermal Management Research: Annual Progress Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moreno, Gilberto
The objective for this project is to develop thermal management strategies to enable efficient and high-temperature wide-bandgap (WBG)-based power electronic systems (e.g., emerging inverter and DC-DC converter). Reliable WBG devices are capable of operating at elevated temperatures (≥ 175 °Celsius). However, packaging WBG devices within an automotive inverter and operating them at higher junction temperatures will expose other system components (e.g., capacitors and electrical boards) to temperatures that may exceed their safe operating limits. This creates challenges for thermal management and reliability. In this project, system-level thermal analyses are conducted to determine the effect of elevated device temperatures on invertermore » components. Thermal modeling work is then conducted to evaluate various thermal management strategies that will enable the use of highly efficient WBG devices with automotive power electronic systems.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mankin, C.J.; Banken, M.K.
The Oklahoma Geological Survey (OGS), the Geo Information Systems department, and the School of Petroleum and Geological Engineering at the University of Oklahoma are engaged in a program to identify and address Oklahoma`s oil recovery opportunities in fluvial-dominated deltaic (FDD) reservoirs. This program includes the systematic and comprehensive collection and evaluation of information on all of Oklahoma`s FDD reservoirs and the recovery technologies that have been (or could be) applied to those reservoirs with commercial success. This data collection and evaluation effort will be the foundation for an aggressive, multifaceted technology transfer program that is designed to support all ofmore » Oklahoma`s oil industry, with particular emphasis on smaller companies and independent operators in their attempts to maximize the economic producibility of FDD reservoirs. Specifically, this project will identify all FDD oil reservoirs in the State; group those reservoirs into plays that have similar depositional origins; collect, organize and analyze all available data conduct characterization and simulation studies on selected reservoirs in each play; and implement a technology transfer program targeted to the operators of FDD reservoirs. Activities were focused primarily on technology transfer elements of the project. This included regional play analysis and mapping, geologic field studies, and reservoir modeling for secondary water flood simulations as used in publication folios and workshops. The computer laboratory was fully operational for operator use. Computer systems design and database development activities were ongoing.« less
ERIC Educational Resources Information Center
Brookland-Cayce Schools, West Columbia, SC.
An evaluation of the second phase of a projected 3-year Title III inservice reading instruction program for teaching personnel is presented after one and one-half years of operation in 16 Cayce-West Columbia, South Carolina, schools. Included is an evaluation prepared by each of the 11 elementary supervisors which includes objectives and how they…
Mash, Bob; Powell, Di; du Plessis, Felicity; van Vuuren, Unita; Michalowska, Margaret; Levitt, Naomi
2007-12-01
In South Africa diabetes makes a significant contribution to the burden of disease. Diabetic retinopathy is a leading cause of adult blindness, and screening can reduce the incidence. This project aimed to implement and evaluate a new service for retinal screening that uses a non-mydriatic mobile fundal camera in primary care. This is the first time such a service has been evaluated in an African primary care context. The service was implemented as an operational research study at three community health centres and data were collected to evaluate the operational issues, screening, reporting and referral of patients. Out of 400 patients screened 84% had a significantly reduced visual acuity, 63% had retinopathy (22% severe nonproliferative, 6% proliferative and 15% maculopathy), 2% of eyes could not be screened and 14% of patients required dilatation. Referral was necessary in 27% of cases for cataracts, in 7% for laser treatment and in 4% for other specialist services. Repeat photography was needed in 8% and urgent follow-up in 12%. A SWOT analysis of the pilot project was completed and recommendations were made on how to integrate it into the district health system. Screening with a fundal camera improved the quality of care for diabetic patients and is feasible in the South African public sector, primary care setting. A single technician should be able to photograph almost 10,000 patients a year.
7 CFR 1455.20 - Criteria for grant selection.
Code of Federal Regulations, 2013 CFR
2013-01-01
... OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS VOLUNTARY PUBLIC ACCESS AND HABITAT INCENTIVE... necessary to achieve the project's goals will be evaluated. (4) Appropriate wildlife habitat. The... assistance with respect to establishing and maintaining appropriate wildlife habitat on public access land...
The ADVANCE project : formal evaluation of the targeted deployment. Volume 1
DOT National Transportation Integrated Search
1997-01-01
The Advanced Driver and Vehicle Advisory Navigation ConcEpt (ADVANCE) was an in-vehicle advanced traveler information system (ATIS) that operated in the northwest suburbs of Chicago, Illinois. It was designed to provide origin-destination shortest-ti...
Radio tuning effects on visual and driving performance measures : simulator and test track studies.
DOT National Transportation Integrated Search
2013-05-01
Existing driver distraction guidelines for visual-manual device interface operation specify traditional : manual radio tuning as a reference task. This project evaluated the radio tuning reference task through two activities. : The first activity con...
7 CFR 4284.942 - Proposal evaluation criteria and scoring applications.
Code of Federal Regulations, 2014 CFR
2014-01-01
.... 4284.942 Section 4284.942 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE GRANTS Value-Added... operational efficiency, profitability, and overall economic sustainability resulting from the project. In...
7 CFR 4284.942 - Proposal evaluation criteria and scoring applications.
Code of Federal Regulations, 2012 CFR
2012-01-01
.... 4284.942 Section 4284.942 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE GRANTS Value-Added... operational efficiency, profitability, and overall economic sustainability resulting from the project. In...
7 CFR 4284.942 - Proposal evaluation criteria and scoring applications.
Code of Federal Regulations, 2013 CFR
2013-01-01
.... 4284.942 Section 4284.942 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE GRANTS Value-Added... operational efficiency, profitability, and overall economic sustainability resulting from the project. In...
Aligning oversize/overweight permit fees with agency costs : critical issues.
DOT National Transportation Integrated Search
2013-08-01
This project provides an elementary analysis of issues and a proposed framework for the state to evaluate cost recovery options : due to OSOW operations. The authors provide a review of current permitting practices, provide a sampling of fee structur...
Aligning oversize/overweight fees with agency costs : critical issues.
DOT National Transportation Integrated Search
2013-08-01
This project provides an elementary analysis of issues and a proposed framework for the state to evaluate cost recovery options : due to OSOW operations. The authors provide a review of current permitting practices, provide a sampling of fee structur...
Rapid stabilization of thawing soils For enhanced vehicle mobility: a field demonstration project
DOT National Transportation Integrated Search
1999-02-01
Thawing soil presents a formidable challenge for vehicle operations cross-country and on unsurfaced roads. To mitigate the problem, a variety of stabilization techniques were evaluated for their suitability for rapid employment to enhance military ve...
Final evaluation report for the CAPITAL-ITS operational test and demonstration program
DOT National Transportation Integrated Search
1997-05-01
The CAPITAL project was undertaken to assess the viability of using cellular-based traffic probes as a wide area vehicular traffic surveillance technique. From the test, cellular technology demonstrated the technical potential to provide vehicle spee...
Future ATM Concepts Evaluation Tool (FACET) Interface Control Document
NASA Technical Reports Server (NTRS)
Grabbe, Shon R.
2017-01-01
This Interface Control Document (ICD) documents the airspace adaptation and air traffic inputs of NASA's Future ATM Concepts and Evaluation Tool (FACET). Its intended audience is the project manager, project team, development team, and stakeholders interested in interfacing with the system. FACET equips Air Traffic Management (ATM) researchers and service providers with a way to explore, develop and evaluate advanced air transportation concepts before they are field-tested and eventually deployed. FACET is a flexible software tool that is capable of quickly generating and analyzing thousands of aircraft trajectories. It provides researchers with a simulation environment for preliminary testing of advanced ATM concepts. Using aircraft performance profiles, airspace models, weather data, and flight schedules, the tool models trajectories for the climb, cruise, and descent phases of flight for each type of aircraft. An advanced graphical interface displays traffic patterns in two and three dimensions, under various current and projected conditions for specific airspace regions or over the entire continental United States. The system is able to simulate a full day's dynamic national airspace system (NAS) operations, model system uncertainty, measure the impact of different decision-makers in the NAS, and provide analysis of the results in graphical form, including sector, airport, fix, and airway usage statistics. NASA researchers test and analyze the system-wide impact of new traffic flow management algorithms under anticipated air traffic growth projections on the nation's air traffic system. In addition to modeling the airspace system for NASA research, FACET has also successfully transitioned into a valuable tool for operational use. Federal Aviation Administration (FAA) traffic flow managers and commercial airline dispatchers have used FACET technology for real-time operations planning. FACET integrates live air traffic data from FAA radar systems and weather data from the National Weather Service to summarize NAS performance. This information allows system operators to reroute flights around congested airspace and severe weather to maintain safety and minimize delay. FACET also supports the planning and post-operational evaluation of reroute strategies at the national level to maximize system efficiency. For the commercial airline passenger, strategic planning with FACET can result in fewer flight delays and cancellations. The performance capabilities of FACET are largely due to its architecture, which strikes a balance between flexibility and fidelity. FACET is capable of modeling the airspace operations for the continental United States, processing thousands of aircraft on a single computer. FACET was written in Java and C, enabling the portability of its software to a variety of operating systems. In addition, FACET was designed with a modular software architecture to facilitate rapid prototyping of diverse ATM concepts. Several advanced ATM concepts have already been implemented in FACET, including aircraft self-separation, prediction of aircraft demand and sector congestion, system-wide impact assessment of traffic flow management constraints, and wind-optimal routing.
GROWTH OF THE INTERNATIONAL CRITICALITY SAFETY AND REACTOR PHYSICS EXPERIMENT EVALUATION PROJECTS
DOE Office of Scientific and Technical Information (OSTI.GOV)
J. Blair Briggs; John D. Bess; Jim Gulliford
2011-09-01
Since the International Conference on Nuclear Criticality Safety (ICNC) 2007, the International Criticality Safety Benchmark Evaluation Project (ICSBEP) and the International Reactor Physics Experiment Evaluation Project (IRPhEP) have continued to expand their efforts and broaden their scope. Eighteen countries participated on the ICSBEP in 2007. Now, there are 20, with recent contributions from Sweden and Argentina. The IRPhEP has also expanded from eight contributing countries in 2007 to 16 in 2011. Since ICNC 2007, the contents of the 'International Handbook of Evaluated Criticality Safety Benchmark Experiments1' have increased from 442 evaluations (38000 pages), containing benchmark specifications for 3955 critical ormore » subcritical configurations to 516 evaluations (nearly 55000 pages), containing benchmark specifications for 4405 critical or subcritical configurations in the 2010 Edition of the ICSBEP Handbook. The contents of the Handbook have also increased from 21 to 24 criticality-alarm-placement/shielding configurations with multiple dose points for each, and from 20 to 200 configurations categorized as fundamental physics measurements relevant to criticality safety applications. Approximately 25 new evaluations and 150 additional configurations are expected to be added to the 2011 edition of the Handbook. Since ICNC 2007, the contents of the 'International Handbook of Evaluated Reactor Physics Benchmark Experiments2' have increased from 16 different experimental series that were performed at 12 different reactor facilities to 53 experimental series that were performed at 30 different reactor facilities in the 2011 edition of the Handbook. Considerable effort has also been made to improve the functionality of the searchable database, DICE (Database for the International Criticality Benchmark Evaluation Project) and verify the accuracy of the data contained therein. DICE will be discussed in separate papers at ICNC 2011. The status of the ICSBEP and the IRPhEP will be discussed in the full paper, selected benchmarks that have been added to the ICSBEP Handbook will be highlighted, and a preview of the new benchmarks that will appear in the September 2011 edition of the Handbook will be provided. Accomplishments of the IRPhEP will also be highlighted and the future of both projects will be discussed. REFERENCES (1) International Handbook of Evaluated Criticality Safety Benchmark Experiments, NEA/NSC/DOC(95)03/I-IX, Organisation for Economic Co-operation and Development-Nuclear Energy Agency (OECD-NEA), September 2010 Edition, ISBN 978-92-64-99140-8. (2) International Handbook of Evaluated Reactor Physics Benchmark Experiments, NEA/NSC/DOC(2006)1, Organisation for Economic Co-operation and Development-Nuclear Energy Agency (OECD-NEA), March 2011 Edition, ISBN 978-92-64-99141-5.« less
Linking Logistics and Operations: A Case Study of World War II Air Power
1991-01-01
Weapon System Evaluation Group, 1951, p. 30). The logistic innovation greatly extended the time that combat ships could remain on station and...presented. This Note was produced under the Project AIR FORCE Resource Management and System Acquisition Program in the project "Combat Support C3 Needs...maintenance workload data suggest either unacceptable system performance or excessive costs. The predictive power of these models is so poor as to
Cost-effective implementation of intelligent systems
NASA Technical Reports Server (NTRS)
Lum, Henry, Jr.; Heer, Ewald
1990-01-01
Significant advances have occurred during the last decade in knowledge-based engineering research and knowledge-based system (KBS) demonstrations and evaluations using integrated intelligent system technologies. Performance and simulation data obtained to date in real-time operational environments suggest that cost-effective utilization of intelligent system technologies can be realized. In this paper the rationale and potential benefits for typical examples of application projects that demonstrate an increase in productivity through the use of intelligent system technologies are discussed. These demonstration projects have provided an insight into additional technology needs and cultural barriers which are currently impeding the transition of the technology into operational environments. Proposed methods which addresses technology evolution and implementation are also discussed.
Prototyping with AIDA for a hospital pharmacy system.
Molenaar, G C; Boon, W M
1987-01-01
The CENTRASYS system for the Hospital Pharmacy, developed as part of a research project of the Department of Medical Informatics is described. The role of AIDA, a fourth-generation software package, as a prototyping tool is discussed. It is concluded that AIDA facilitates prototyping and is also very suitable as a vehicle for systems in operation. It is further concluded that prototyping is of great help in the developmental phase of a project, but that great care has to be taken during evaluation of the prototypes: minimize the number of test sites and try to avoid that users become dependent on the system, because every prototype needs further tuning before it really becomes an operational system.
Albeni Falls Wildlife Mitigation : Annual Report 2002.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Terra-Berns, Mary
The Albeni Falls Interagency Work Group continued to actively engage in implementing wildlife mitigation actions in 2002. Regular Work Group meetings were held to discuss budget concerns affecting the Albeni Falls Wildlife Mitigation Program, to present potential acquisition projects, and to discuss and evaluate other issues affecting the Work Group and Project. Work Group members protected 1,386.29 acres of wildlife habitat in 2002. To date, the Albeni Falls project has protected approximately 5,914.31 acres of wildlife habitat. About 21% of the total wildlife habitat lost has been mitigated. Administrative activities have increased as more properties are purchased and continue tomore » center on restoration, operation and maintenance, and monitoring. In 2001, Work Group members focused on development of a monitoring and evaluation program as well as completion of site-specific management plans. This year the Work Group began implementation of the monitoring and evaluation program performing population and plant surveys, data evaluation and storage, and map development as well as developing management plans. Assuming that the current BPA budget restrictions will be lifted in the near future, the Work Group expects to increase mitigation properties this coming year with several potential projects.« less
Emerging photovoltaic module technologies at PVUSA: A five-year assessment
NASA Astrophysics Data System (ADS)
Townsend, Tim
1995-04-01
The Photovoltaics for Utility Scale Applications (PVUSA) project tests two types of photovoltaic systems: new modules fielded as 20-kW emerging module technology (EMT) arrays, and more mature technologies fielded as 20- to 500-kW turnkey utility scale (US) systems. This report summarizes experiences of the PVUSA project in operating the first six 20-kW EMT photovoltaic systems. Five systems are installed at Davis, California, and one at Kihei, Hawaii. Products selected for testing and demonstration were judged to have potential for significant technical advancement or reduction in manufacturing cost. Features leading to selection of each system and findings over the average 5 years of operation are compared in the report. Factory product qualification test experiences along with field acceptance test results are documented. Evaluation includes a broad range of performance parameters, including long-term efficiency, seasonal generation patterns, and maintenance. While some of the arrays have operated as well as any commercial system, others have fared poorly. Throughout the procurement and operation of these precommercial PV modules, PVUSA has provided feedback to vendors, critical for product improvement. The data and evaluations in this report will be of further benefit to manufacturers and provide general comparative information on a variety of technologies to researchers in utilities, government, and industry alike.
Advanced Pathway Guidance Evaluations on a Synthetic Vision Head-Up Display
NASA Technical Reports Server (NTRS)
Kramer, Lynda J.; Prinzel, Lawrence J., III; Arthur, Jarvis J., III; Bailey, Randall E.
2005-01-01
NASA's Synthetic Vision Systems (SVS) project is developing technologies with practical applications to potentially eliminate low visibility conditions as a causal factor to civil aircraft accidents while replicating the operational benefits of clear day flight operations, regardless of the actual outside visibility condition. A major thrust of the SVS project involves the development/demonstration of affordable, certifiable display configurations that provide intuitive out-the-window terrain and obstacle information with advanced guidance for commercial and business aircraft. This experiment evaluated the influence of different pathway and guidance display concepts upon pilot situation awareness (SA), mental workload, and flight path tracking performance for Synthetic Vision display concepts using a Head-Up Display (HUD). Two pathway formats (dynamic and minimal tunnel presentations) were evaluated against a baseline condition (no tunnel) during simulated instrument meteorological conditions approaches to Reno-Tahoe International airport. Two guidance cues (tadpole, follow-me aircraft) were also evaluated to assess their influence. Results indicated that the presence of a tunnel on an SVS HUD had no effect on flight path performance but that it did have significant effects on pilot SA and mental workload. The dynamic tunnel concept with the follow-me aircraft guidance symbol produced the lowest workload and provided the highest SA among the tunnel concepts evaluated.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Garrett, Richard L.; Niemi, Belinda J.; Paik, Ingle K.
2013-11-07
A Comparative Evaluation was conducted for One System Integrated Project Team to compare the safety bases for the Hanford Waste Treatment and Immobilization Plant Project (WTP) and Tank Operations Contract (TOC) (i.e., Tank Farms) by an Expert Review Team. The evaluation had an overarching purpose to facilitate effective integration between WTP and TOC safety bases. It was to provide One System management with an objective evaluation of identified differences in safety basis process requirements, guidance, direction, procedures, and products (including safety controls, key safety basis inputs and assumptions, and consequence calculation methodologies) between WTP and TOC. The evaluation identified 25more » recommendations (Opportunities for Integration). The resolution of these recommendations resulted in 16 implementation plans. The completion of these implementation plans will help ensure consistent safety bases for WTP and TOC along with consistent safety basis processes. procedures, and analyses. and should increase the likelihood of a successful startup of the WTP. This early integration will result in long-term cost savings and significant operational improvements. In addition, the implementation plans lead to the development of eight new safety analysis methodologies that can be used at other U.S. Department of Energy (US DOE) complex sites where URS Corporation is involved.« less
[Artistic anatomy of the nose: proposals for a simplified project of rhinoplasty].
Polselli, R; Saban, Y
2007-01-01
The authors developed an original and simple method of evaluation of the aesthetic lines of the nose adapted to the harmony of the face. Initially based on their experience, the authors propose an evaluation of the nose in 2 stages and 5 sequencies based on the construction of single circuit lines according to various incidences. They checked thereafter the validity of this method on the operative project and on the appreciation of the results of the rhinoplasties. Controlled on several types of faces, the method suggested by the authors proved to be reliable, simple, reproducible. The authors proposed a method of evaluation of the aesthetic lines of the nose integrated to the harmony of the face. This method relies on the construction, in 5 stages, of single circuit lines not requiring any particular material. The artistic method of evaluation of the nose proposed by the authors is very simple. Rapid and immediately usable, it makes it possible to schedule a rhinoplasty in a few minutes. The evaluation of the aesthetic results of the rhinoplasties is also very simple and reproducible. It has moreover the merit to propose a model of teaching making it possible to the rhinoplastician to criticize his results and thus to progress in its technical training and its operational indications.
Fast, Accurate and Shift-Varying Line Projections for Iterative Reconstruction Using the GPU
Pratx, Guillem; Chinn, Garry; Olcott, Peter D.; Levin, Craig S.
2013-01-01
List-mode processing provides an efficient way to deal with sparse projections in iterative image reconstruction for emission tomography. An issue often reported is the tremendous amount of computation required by such algorithm. Each recorded event requires several back- and forward line projections. We investigated the use of the programmable graphics processing unit (GPU) to accelerate the line-projection operations and implement fully-3D list-mode ordered-subsets expectation-maximization for positron emission tomography (PET). We designed a reconstruction approach that incorporates resolution kernels, which model the spatially-varying physical processes associated with photon emission, transport and detection. Our development is particularly suitable for applications where the projection data is sparse, such as high-resolution, dynamic, and time-of-flight PET reconstruction. The GPU approach runs more than 50 times faster than an equivalent CPU implementation while image quality and accuracy are virtually identical. This paper describes in details how the GPU can be used to accelerate the line projection operations, even when the lines-of-response have arbitrary endpoint locations and shift-varying resolution kernels are used. A quantitative evaluation is included to validate the correctness of this new approach. PMID:19244015
DOE Office of Scientific and Technical Information (OSTI.GOV)
Merz, Norm
2009-02-18
The overarching goals of the 'Kootenai River Floodplain Ecosystem Operational Loss Assessment, Protection, Mitigation and Rehabilitation' Project (BPA Project No.2002-011-00) are to: (1) assess abiotic and biotic factors (i.e., geomorphologic, hydrological, aquatic and riparian/floodplain communities) in determining a definitive composition of ecological integrity, (2) develop strategies to assess and mitigate losses of ecosystem functions, and (3) produce a regional operational loss assessment framework. To produce a scientifically defensible, repeatable, and complete assessment tool, KTOI assembled a team of top scientists in the fields of hydrology, hydraulics, ornithology, entomology, statistics, and river ecology, among other expertise. This advisory team is knownmore » as the Research Design and Review Team (RDRT). The RDRT scientists drive the review, selection, and adaptive management of the research designs to evaluate the ecologic functions lost due to the operation of federal hydropower facilities. The unique nature of this project (scientific team, newest/best science, adaptive management, assessment of ecological functions, etc.) has been to work in a dynamic RDRT process. In addition to being multidisciplinary, this model KTOI project provides a stark contrast to the sometimes inflexible process (review, re-review, budgets, etc.) of the Columbia River Basin Fish and Wildlife Program. The project RDRT is assembled annually, with subgroups meeting as needed throughout the year to address project issues, analyses, review, and interpretation. Activities of RDRT coordinated and directed the selection of research and assessment methodologies appropriate for the Kootenai River Watershed and potential for regional application in the Columbia River Basin. The entire RDRT continues to meet annually to update and discuss project progress. RDRT Subcontractors work in smaller groups throughout the year to meet project objectives. Determining the extent to which ecological systems are experiencing anthropogenic disturbance and change in structure and function is critical for long term conservation of biotic diversity in the face of changing landscapes and land use. KTOI and the RDRT propose a concept based on incorporating hydrologic, aquatic, and terrestrial components into an operations-based assessment framework to assess ecological losses as shown in Figure E-1.« less
Implementation of a Sustainable Training System for Emergency in Vietnam.
Kang, Sunjoo; Seo, Hyejin; Ho, Binh Duy; Nguyen, Phuong Thi Anh
2018-01-01
This study analyzed the project outcomes to share lessons regarding the development of an emergency medicine education system in Vietnam. Retrospective evaluation was implemented using project outcome indicators. A total of 13 training courses were administered, with the collaboration of international experts in Korea and Vietnam. A total of 23 kinds of emergency medicine education equipment were purchased, and a basic life support (BLS) and two advanced cardiac life support labs were remodeled to provide appropriate simulation training. Throughout the 2 years of the project, nine Vietnamese BLS instructors were approved by the Korea Association of Cardiopulmonary Resuscitation under American Heart Association. Results of evaluation by Korean international development experts were based on five criteria, provided by the Development Assistance Committee of the Organization for Economic Co-operation and Development, were excellent. Success factors were identified as partnership, ownership, commitment, government support, and global networking. Project indicators were all accomplished and received an excellent evaluation by external experts. For sustainable success, healthcare policy and legal regulation to promote high quality and safe service to the Vietnamese people are recommended.
Economic development and conservation of biological and cultural diversity in Yunnan Province, China
Stendell, R.C.; Johnson, Richard L.; Mosesso, J.P.; Zhang, X.
2001-01-01
Chinese and American scientists are co-operating to develop concepts, strategies, agreements, and proposals in support of an economic development and sustainable ecosystems project in Yunnan Province, People's Republic of China. Yunnan's Provincial Government has initiated a major programme to develop and further utilise its biological resources to help improve economic conditions for its citizens. They are co-operating with the US Geological Survey (USGS) on evaluation and management of biological resources so economic development will be compatible with sustainable ecological systems. Scientists from the USGS and co-operating universities will provide expertise on synthesising biological data, conducting a Gap Analysis for the Province, evaluating innovative economic opportunities, and designing an effective education, training, and outreach programme.
Sakai, Tetsuro; Emerick, Trent D; Patel, Rita M
2015-09-01
The Accreditation Council for Graduate Medical Education has emphasized in its core competencies and more recently, in its Milestones Project, that residents understand the importance of systems-based practice (SBP). The objectives of the study are to evaluate the quality of residents' SBP projects and to determine the degrees that were subsequently implemented. A retrospective educational observational study. A university-based anesthesiology training institution. One hundred forty-nine anesthesiology residents in their final (postgraduate year 4) year of training who completed SBP projects for the last 10 years (2004-2013). A structured SBP course was provided for postgraduate year 4 anesthesiology residents with deadlines set such as project identification, data collection, and proposal draft. Each resident's written SBP proposal received inputs by 2 members of the department executive steering committee. The SBP projects concluded with oral presentations by each resident to the department executive steering committee, who provided overall scores. All SBP projects were categorized into 7 categories: safety initiatives, economic analysis, process analysis, policy change recommendations, education initiatives, teamwork/communication, and operating room efficiency. Evaluation scores using a Likert scale (1-9, where 9 is the best) were analyzed. The rate of implementation of project ideas within the department based on the presentations to the executive committee was examined. Of 149 projects, policy change recommendations was the most frequently chosen category (46 projects; 30.9%), followed by process analysis (36 projects; 24.2%). The overall evaluation score was 7.6 ± 0.6 (mean ± SD). A total of 53 projects (35.6%) were implemented in the department. There was no statistical difference between SBPs with implementation vs SBPs without implementation in terms of evaluation scores, year of the presentation, or categories. This SBP project has given residents the opportunity to participate in a hospital system change aiming to improve efficiency and safety. Copyright © 2015 Elsevier Inc. All rights reserved.
Assessment of treatment systems for highway runoff pollution control in Portugal.
Barbosa, A E; Fernandes, J N
2009-01-01
Treatment systems for highway runoff pollution control are now common structures for environmental impacts reduction in Portugal. Such systems must be monitored and its performance periodically assessed, in order to understand if they are accomplishing the targets for environmental protection. Wise management decisions must incorporate the soundness of the project, the construction and maintenance costs, and the ability of the system to reduce the pollution to the level required for environmental protection. To gather, organize and analyse all the existing information concerning the constructed treatment systems, their operation, maintenance and efficiency were understood as a priority by the Portuguese Roads' Institute. The authors of this article were responsible for this 3 years study that finished in May 2008. A total of 27 different systems, corresponding to 13 different project types, located in different places in Portugal have been characterized and evaluated. Several conclusions could be drawn from the evaluation and recommendations were produced concerning the project, the construction and operation phases and the monitoring activities. The recommendations concern tasks to be performed and information that should be gathered and presented to the Portuguese Road's Institute. It is expected that these indications will contribute to improve the future practice in Portugal.
MATD Operational Phase: Experiences and Lessons Learned
NASA Astrophysics Data System (ADS)
Messidoro, P.; Bader, M.; Brunner, O.; Cerrato, A.; Sembenini, G.
2004-08-01
The Model And Test Effectiveness Database (MATD) initiative is ending the first year of its operational phase. MATD represents a common repository of project data, Assembly Integration and Verification (AIV) data, on ground and flight anomalies data, of recent space projects, and offers, with the application of specific methodologies, the possibility to analyze the collected data in order to improve the test philosophies and the related standards. Basically the following type of results can be derived from the database: - Statistics on ground failures and flight anomalies - Feed-back from the flight anomalies to the Test Philosophies - Test Effectiveness evaluation at system and lower levels - Estimate of the index of effectiveness of a specific Model and Test Philosophy in comparison with the applicable standards - Simulation of different Test philosophies and related balancing of Risk/cost/schedule on the basis of MATD data The paper after a short presentation of the status of the MATD initiative, summarises the most recent lessons learned which are resulting from the data analysis and highlights how MATD is being utilized for the actual risk/cost/schedule/Test effectiveness evaluations of the past programmes so as for the prediction of the new space projects.
Two-spinor description of massive particles and relativistic spin projection operators
NASA Astrophysics Data System (ADS)
Isaev, A. P.; Podoinitsyn, M. A.
2018-04-01
On the basis of the Wigner unitary representations of the covering group ISL (2 , C) of the Poincaré group, we obtain spin-tensor wave functions of free massive particles with arbitrary spin. The wave functions automatically satisfy the Dirac-Pauli-Fierz equations. In the framework of the two-spinor formalism we construct spin-vectors of polarizations and obtain conditions that fix the corresponding relativistic spin projection operators (Behrends-Fronsdal projection operators). With the help of these conditions we find explicit expressions for relativistic spin projection operators for integer spins (Behrends-Fronsdal projection operators) and then find relativistic spin projection operators for half integer spins. These projection operators determine the numerators in the propagators of fields of relativistic particles. We deduce generalizations of the Behrends-Fronsdal projection operators for arbitrary space-time dimensions D > 2.
14. Implementation, execution, and completion of projects.
2014-05-01
Once an intervention has been selected for implementation, it becomes a project. Implementation of a project is a complex process and requires completion of a host of tasks. The implementation process has been deconstructed into its components so that it can be analysed and evaluated. A prerequisite for implementation is an operational plan. The tasks that require completion include: (1) reassessing current status and verifying the needs; (2) activating the operational plan; (3) setting-up and operating an administrative structure; (4) identifying, acquiring, and organising resources (including human resources); (5) assigning roles and responsibilities; (6) educating and training personnel (including mission-specific); (7) briefing staff; (8) preparing/readying resources for transport; (9) assuring project self-sufficiency; (10) arranging for personal necessities; (11) ensuring the safety of personnel and the security of equipment and supplies; (12) insuring personnel; (13) coordinating with other projects/actors; (14) coordinating with other BSF systems (role of the coordination and control centre); (15) communicating with community leaders; (16) initiating the use of standardised progress reports; (17) deploying personnel, equipment, and supplies; (18) initiating the intervention(s); (19) executing the intervention(s); (20) reporting start of interventions; (21) completing the project; and (22) completing and submitting a formal report. This deconstruction is essential in order to study the process and identify critical points of success and failure. It also is recognised that many interventions consist of many components (subfunctions), each of which may be considered a production process.
7 CFR 1709.123 - Evaluation criteria and weights.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 1709.123 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE... project once the grant period has ended. Reviewers must make a finding of operational sustainability for... reduction in energy cost or improvement in service. (5) Coordination with rural development initiatives...
7 CFR 1709.123 - Evaluation criteria and weights.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 1709.123 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE... project once the grant period has ended. Reviewers must make a finding of operational sustainability for... reduction in energy cost or improvement in service. (5) Coordination with rural development initiatives...
7 CFR 1709.123 - Evaluation criteria and weights.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 1709.123 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE... project once the grant period has ended. Reviewers must make a finding of operational sustainability for... reduction in energy cost or improvement in service. (5) Coordination with rural development initiatives...
7 CFR 1709.123 - Evaluation criteria and weights.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 1709.123 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE... project once the grant period has ended. Reviewers must make a finding of operational sustainability for... reduction in energy cost or improvement in service. (5) Coordination with rural development initiatives...
DOT National Transportation Integrated Search
2013-11-01
A variety of methods for obtaining detailed analyses regarding the timing and duration of winter weather across the state of Indiana for : multiple seasons were compared and evaluated during this project. Meteorological information from sources such ...
Multi-Laboratory Validation of Estrone (E1) ELISA Methods
This project is a round-robin evaluation of commercially available Enzyme-Linked Immunosorbent Assay (ELISA) technology to quantitatively or qualitatively measure the hormone estrone (E1) in combined animal feeding operation (CAFO) receiving streams. ELISA is meant to be a simpl...
Interim Evaluation of Three Instrumented Bridge Decks in Saco, Montana
DOT National Transportation Integrated Search
2006-06-01
Since the service life of concrete bridge decks designed by traditional procedures is often shorter than desired, : their ability to withstand constant and heavy use in a variety of operating environments is of major concern. In : this project, the r...
DOT National Transportation Integrated Search
2000-01-01
This report demonstrates the benefits and potential pitfalls of deploying and operating an integrated freeway and arterial management system. In particular, it discusses the lessons learned about the Medical Center Corridor (MCC) Project deployed in ...
Seven-year evaluation of three instrumented bridge decks in Saco, Montana.
DOT National Transportation Integrated Search
2010-11-01
Since the service life of concrete bridge decks designed by traditional procedures is often shorter than : desired, their ability to withstand constant and heavy use in a variety of operating environments is of : major concern. In this project, the r...
Seven-Year Evaluation of Three Instrumented Bridge Decks in Saco, Montana
DOT National Transportation Integrated Search
2010-11-01
Since the service life of concrete bridge decks designed by traditional procedures is often shorter than : desired, their ability to withstand constant and heavy use in a variety of operating environments is of : major concern. In this project, the r...
Assessment of a human computer interface prototyping environment
NASA Technical Reports Server (NTRS)
Moore, Loretta A.
1993-01-01
A Human Computer Interface (HCI) prototyping environment with embedded evaluation capability has been successfully assessed which will be valuable in developing and refining HCI standards and evaluating program/project interface development, especially Space Station Freedom on-board displays for payload operations. The HCI prototyping environment is designed to include four components: (1) a HCI format development tool, (2) a test and evaluation simulator development tool, (3) a dynamic, interactive interface between the HCI prototype and simulator, and (4) an embedded evaluation capability to evaluate the adequacy of an HCI based on a user's performance.
The Use of Operational Excellence Principles in a University Hospital.
Edelman, Eric R; Hamaekers, Ankie E W; Buhre, Wolfgang F; van Merode, Godefridus G
2017-01-01
The introduction of Operational Excellence in the Maastricht University Medical Center (MUMC+) has been the first of its kind and scale for a university hospital. The policy makers of the MUMC+ have combined different elements from various other business, management, and healthcare philosophies and frameworks into a unique mix. This paper summarizes the journey of developing this system and its most important aspects. Special attention is paid to the role of the operating rooms and the improvements that have taken place there, because of their central role in the working of the hospital. The MUMC+ is the leading tertiary healthcare center for the South-East region of The Netherlands and beyond. Regional, national, and international developments encouraged the MUMC+ to start significantly reorganizing its care processes from 2009 onward. First experiments with Lean Six Sigma and Business Modeling were combined with lessons learned from other centers around the world to form the MUMC+'s own type of Operational Excellence. At the time of writing, many improvement projects of different types have been successfully completed. Every single department in the hospital now uses Operational Excellence and design thinking in general as a method to develop new models of care. An evaluation in 2014 revealed several opportunities for improvement. A large number of projects were in progress, but 75% of all projects had not been completed, despite the first projects being initiated back in 2012. This led to a number of policy changes, mainly focusing on more intensive monitoring of projects and trying to do more improvement projects directly under the responsibility of the line manager. Focusing on patient value, continuous improvement, and the reduction of waste have proven to be very fitting principles for healthcare in general and specifically for application in a university hospital. Approaching improvement at a systems level while directly involving the people on the work floor in observing opportunities for improvement and realizing these has shown itself to be essential.
The Use of Operational Excellence Principles in a University Hospital
Edelman, Eric R.; Hamaekers, Ankie E. W.; Buhre, Wolfgang F.; van Merode, Godefridus G.
2017-01-01
The introduction of Operational Excellence in the Maastricht University Medical Center (MUMC+) has been the first of its kind and scale for a university hospital. The policy makers of the MUMC+ have combined different elements from various other business, management, and healthcare philosophies and frameworks into a unique mix. This paper summarizes the journey of developing this system and its most important aspects. Special attention is paid to the role of the operating rooms and the improvements that have taken place there, because of their central role in the working of the hospital. The MUMC+ is the leading tertiary healthcare center for the South-East region of The Netherlands and beyond. Regional, national, and international developments encouraged the MUMC+ to start significantly reorganizing its care processes from 2009 onward. First experiments with Lean Six Sigma and Business Modeling were combined with lessons learned from other centers around the world to form the MUMC+’s own type of Operational Excellence. At the time of writing, many improvement projects of different types have been successfully completed. Every single department in the hospital now uses Operational Excellence and design thinking in general as a method to develop new models of care. An evaluation in 2014 revealed several opportunities for improvement. A large number of projects were in progress, but 75% of all projects had not been completed, despite the first projects being initiated back in 2012. This led to a number of policy changes, mainly focusing on more intensive monitoring of projects and trying to do more improvement projects directly under the responsibility of the line manager. Focusing on patient value, continuous improvement, and the reduction of waste have proven to be very fitting principles for healthcare in general and specifically for application in a university hospital. Approaching improvement at a systems level while directly involving the people on the work floor in observing opportunities for improvement and realizing these has shown itself to be essential. PMID:28752089
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, GE; Diefenderfer, HL
The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration (BPA), U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. In fiscal year 2008 (FY08), EOS project accomplishments included (1) subgroup meetings; (2) participation inmore » the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; (3) project management via BPA's project tracking system, Pisces; (4) quarterly project status reports; and (5) a major revision to the Estuary RME document and its subsequent regional release (new version January 2008). Many of the estuary RME recommendations in this document were incorporated into the Biological Opinion on FCRPS operations (May 2008). In summary, the FY08 EOS project resulted in expanded, substantive coordination with other regional RME forums, a new version of the federal Estuary RME program document, and implementation coordination. This annual report is a FY08 deliverable for the project titled Facilitation of the Estuary/Ocean Subgroup.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, Gary E.; Diefenderfer, Heida L.
The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. In fiscal year 2008 (FY08), EOS project accomplishments included 1) subgroup meetings; 2) participation in themore » estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; 3) project management via the project tracking system, Pisces; 4) quarterly project status reports; and 5) a major revision to the Estuary RME document and its subsequent regional release (new version January 2008). Many of the estuary RME recommendations in this document were incorporated into the Biological Opinion on hydrosystem operations (May 2008). In summary, the FY08 EOS project resulted in expanded, substantive coordination with other regional RME forums, a new version of the federal Estuary RME program document, and implementation coordination. This annual report is a FY08 deliverable for the project titled Facilitation of the Estuary/Ocean Subgroup.« less
ERIC Educational Resources Information Center
Sieber, Sam D.; And Others
The Pilot State Dissemination Program of the National Center for Educational Communication, carried out in three target states by field agents, is evaluated as to goals, procedures, and outcomes. The seven parts of Volume I, and their chapters, are as follows: Part I, Goals: Alternative Goals of Extension-Retrieval Projects; Part II, Field Agent…
ERIC Educational Resources Information Center
Lynch, Joanne
This report presents an evaluation of the International Academy for Bilingual Education and Bicultural Studies, an Elementary and Secondary Education Act Title VII-funded project in its third year of operation in 1992-93. The program provided instructional and support services to 74 Chinese- and English-speaking students in 1 pre-kindergarten, 1…
DOE Office of Scientific and Technical Information (OSTI.GOV)
N /A
This Environmental Assessment (EA) evaluates environmental issues associated with constructing and operating an integrated emissions control system proposed by We Energies and its project partners with cost-shared funding support by DOE. The proposed project would be demonstrated at the existing 90-MW Units 7, 8, and 9 of We Energies' coal-fired Presque Isle Power Plant in Marquette, Michigan. The commercial-scale demonstrate would allow utilities to make decisions regarding the integrated emissions control system as a viable commercial option. DOE's share of the funding for the 5-year demonstration project would be about $25 million, while $25 million would also be provided bymore » We Energies and its project partners. This project was selected by DOE under the Clean Coal Power Initiative (CCPI) for negotiation of a cooperative agreement to demonstrate the integration of technologies to reduce emissions of mercury (Hg) and particulate matter, as well as potentially control sulfur dioxide (SO{sub 2}), oxides of nitrogen (NO{sub x}) and hydrochloric acid (HCl) emissions. DOE's decision is whether or not to fund the project. The EA evaluates the principal environmental issues, including air quality, waste management, and traffic, that could result from construction and operation of the proposed project. The EA also considers two reasonably foreseeable scenarios that could result from the no-action alternative in which DOE would not provide cost-shared funding for the proposed project. Key findings include that potential air quality impacts resulting from the proposed project would generally be beneficial because plantwide air emissions would decrease or continue at the same level. The decrease in stack exit temperature would decrease the plume rise, which could result in increased downwind ground-level concentrations of those air pollutants experience little or no decrease in stack emissions. However, results of air dispersion modeling indicated that no major impacts would be expected relative to Prevention of Significant Deterioration increments and National Ambient Air Quality Standards.« less
NASA Astrophysics Data System (ADS)
Neves de Campos, Thiago
This research examines the distortionary effects of a discovered and undeveloped sequential modular offshore project under five different designs for a production-sharing agreement (PSA). The model differs from previous research by looking at the effect of taxation from the perspective of a host government, where the objective is to maximize government utility over government revenue generated by the project and the non-pecuniary benefits to society. This research uses Modern Asset Pricing (MAP) theory, which is able to provide a good measure of the asset value accruing to various stakeholders in the project combined with the optimal decision rule for the development of the investment opportunity. Monte Carlo simulation was also applied to incorporate into the model the most important sources of risk associated with the project and to account for non-linearity in the cash flows. For a complete evaluation of how the fiscal system affects the project development, an investor's behavioral model was constructed, incorporating three operational decisions: investment timing, capacity size and early abandonment. The model considers four sources of uncertainty that affect the project value and the firm's optimal decision: the long run oil price and short-run deviations from that price, cost escalation and the reservoir recovery rate. The optimizations outcomes show that all fiscal systems evaluated produce distortion over the companies' optimal decisions, and companies adjust their choices to avoid taxation in different ways according to the fiscal system characteristics. Moreover, it is revealed that fiscal systems with tax provisions that try to capture additional project profits based on production profitability measures leads to stronger distortions in the project investment and output profile. It is also shown that a model based on a fixed percentage rate is the system that creates the least distortion. This is because companies will be subjected to the same government share of profit oil independently of any operational decision which they can make to change the production profile to evade taxation.
Botti, Mari; Kent, Bridie; Bucknall, Tracey; Duke, Maxine; Johnstone, Megan-Jane; Considine, Julie; Redley, Bernice; Hunter, Susan; de Steiger, Richard; Holcombe, Marlene; Cohen, Emma
2014-08-28
Evidence from clinical practice and the extant literature suggests that post-operative pain assessment and treatment is often suboptimal. Poor pain management is likely to persist until pain management practices become consistent with guidelines developed from the best available scientific evidence. This work will address the priority in healthcare of improving the quality of pain management by standardising evidence-based care processes through the incorporation of an algorithm derived from best evidence into clinical practice. In this paper, the methodology for the creation and implementation of such an algorithm that will focus, in the first instance, on patients who have undergone total hip or knee replacement is described. In partnership with clinicians, and based on best available evidence, the aim of the Management Algorithm for Post-operative Pain (MAPP) project is to develop, implement, and evaluate an algorithm designed to support pain management decision-making for patients after orthopaedic surgery. The algorithm will provide guidance for the prescription and administration of multimodal analgesics in the post-operative period, and the treatment of breakthrough pain. The MAPP project is a multisite study with one coordinating hospital and two supporting (rollout) hospitals. The design of this project is a pre-implementation-post-implementation evaluation and will be conducted over three phases. The Promoting Action on Research Implementation in Health Services (PARiHS) framework will be used to guide implementation. Outcome measurements will be taken 10 weeks post-implementation of the MAPP. The primary outcomes are: proportion of patients prescribed multimodal analgesics in accordance with the MAPP; and proportion of patients with moderate to severe pain intensity at rest. These data will be compared to the pre-implementation analgesic prescribing practices and pain outcome measures. A secondary outcome, the efficacy of the MAPP, will be measured by comparing pain intensity scores of patients where the MAPP guidelines were or were not followed. The outcomes of this study have relevance for nursing and medical professionals as well as informing health service evaluation. In establishing a framework for the sustainable implementation and evaluation of a standardised approach to post-operative pain management, the findings have implications for clinicians and patients within multiple surgical contexts.
Hogan, Robin
2008-01-15
Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.
NASA Astrophysics Data System (ADS)
Margarit, G.
2013-12-01
This paper presents the results obtained by GMV in the maritime surveillance operational activations conducted in a set of research projects. These activations have been actively supported by users, which feedback has been essential for better understanding their needs and the most urgent requested improvements. Different domains have been evaluated from pure theoretical and scientific background (in terms of processing algorithms) up to pure logistic issues (IT configuration issues, strategies for improving system performance and avoiding bottlenecks, parallelization and back-up procedures). In all the cases, automatizing is the key work because users need almost real time operations where the interaction of human operators is minimized. In addition, automatizing permits reducing human-derived errors and provides better error tracking procedures. In the paper, different examples will be depicted and analysed. For sake of space limitation, only the most representative ones will be selected. Feedback from users will be include and analysed as well.
NASA Technical Reports Server (NTRS)
Bailey, Randall E.; Prinzel, Lawrence J.; Kramer, Lynda J.; Young, Steve D.
2011-01-01
The document describes a Concept of Operations for Flight Deck Display and Decision Support technologies which may help enable emerging Next Generation Air Transportation System capabilities while also maintaining, or improving upon, flight safety. This concept of operations is used as the driving function within a spiral program of research, development, test, and evaluation for the Integrated Intelligent Flight Deck (IIFD) project. As such, the concept will be updated at each cycle within the spiral to reflect the latest research results and emerging developments
Telescience testbedding for life science missions on the Space Station
NASA Technical Reports Server (NTRS)
Rasmussen, D.; Mian, A.; Bosley, J.
1988-01-01
'Telescience', defined as the ability of distributed system users to perform remote operations associated with NASA Space Station life science operations, has been explored by a developmental testbed project allowing rapid prototyping to evaluate the functional requirements of telescience implementation in three areas: (1) research planning and design, (2) remote operation of facilities, and (3) remote access to data bases for analysis. Attention is given to the role of expert systems in telescience, its use in realistic simulation of Space Shuttle payload remote monitoring, and remote interaction with life science data bases.
1988-10-20
The LOCK project , from its very beginnings as an implementation study for the Provably Secure Operating System in 1979...to the security field, can study to gain insight into the evaluation process. The project has developed an innovative format for the DTLS and FTLS...management tern becomes available, the Al Secure DBMS will be system (DBMS) that is currently being developed un- ported to it . der the Advanced
Heber Binary Project. Binary Cycle Geothermal Demonstration Power Plant (RP1900-1)
NASA Astrophysics Data System (ADS)
Lacy, R. G.; Nelson, T. T.
1982-12-01
The Heber Binary Project (1) demonstrates the potential of moderate temperature (below 410 F) geothermal energy to produce economic electric power with binary cycle conversion technology; (2) allows the scaling up and evaluation of the performance of binary cycle technology in geothermal service; (3) establishes schedule, cost and equipment performance, reservoir performance, and the environmental acceptability of such plants; and (4) resolves uncertainties associated with the reservoir performance, plant operation, and economics.
¡VAMOS! (Viable Alternative Mine Operating System) - a 'Horizon 2020' project
NASA Astrophysics Data System (ADS)
Sword, Cameron; Bodo, Balazs; Kapusniak, Stef; Bosman, Frank; Rainbird, Jenny; Silva, Eduardo
2017-04-01
The 42-month ¡VAMOS! project (Viable Alternative Mine Operating System, Grant Agreement 642477, www.vamos-project.eu), funded by the EC H2020 Programme, will enable access to high-grade EU reserves of mineral ore-bodies by developing an innovative clean and low visibility mining technique. The project will demonstrate the technological and economic viability of the underwater extraction of metallic mineral deposits which are currently technologically, economically, and environmentally unobtainable. In doing so, ¡VAMOS! hopes to encourage investment in abandoned open-pit mines and prospective mines, helping to put the EU back on a level playing field with the rest of the world in terms of access to strategically important minerals. The ¡VAMOS! concept is defined by a remotely-operated underwater mining vehicle, adapted and improved from existing subsea mining technology. Operating in tandem with an HROV, the mining vehicle will connect to a flexible riser through which slurried mined material will be pumped from the mudline to onshore dewatering facilities via a floating mobile deployment-module, on which will be fitted a bypass system linked to an LIBS, allowing real-time grade-control. Analysis of European and national regulation and stakeholder assessments found there is significant support for developing the technology among local communities and governments. An initial environmental assessment of the potential impact of the innovative mining operation concluded the project has a smaller environmental footprint than conventional mining operations: this is due to factors including the quieter operation and absence of blasting, zero water-table flux, and the higher stripping ratio enabled by higher fluid pressure acting on the sidewalls of the mine. The prototypes are currently in their construction phase following a final design freeze in October 2016. Work is now underway on the foresight visioning, economic evaluation and policy guidelines for the ¡VAMOS! methodology and technologies; the project team will be identifying key areas of research interest and assessing the micro and macroeconomic impact of ¡VAMOS!. The deadline for the completion of the underwater mining vehicle prototype is May 2017, and the HROV hardware and software is to be completed by July 2017. Site-tests will take place in the months after the build completion at a number of unique abandoned mines across Europe, with final proof of operational viability due by November 2017.
"India Population Projects" in Karnataka.
Reddy, P H; Badari, V S
1991-12-01
An overview, objectives, implementation, and research and evaluation studies of 2 India Population Projects in Karnataka are presented. The India Population Project I (IPP-I) was conducted in Karnataka and Uttar Pradesh. India Population Project III (IPP-III) took place between 1984-92 in 6 districts of Karnataka: Belgaum, Bijapur, Dharwad, Bidar, Gulbarga, and Raichur, and 4 districts in Kerala. The 6 districts in Karnataka accounted for 36% (13.2 million) of the total national population. The project cost was Rs. 713.1 million which was shared by the World Bank, and the Indian national and regional government. Due to poor past performance, these projects were undertaken to improve health and family welfare status. Specific project objectives are outlined. IPP-I included an urban component, and optimal Government of India program, and an intensive rural initiative. The urban program aimed to improved pre- and postnatal services and facilities, and the family planning (FP) in Bangalore city. The rural program was primarily to provide auxiliary nurse-midwives and hospitals and clinics, and also supplemental feeding program for pregnant and nursing mothers and children up to 2 years. The government program provided FP staff and facilities. IPP-I had 3 units to oversee building construction, to recruit staff and provide supplies and equipment, and to establish a Population Center. IPP-III was concerned with service delivery; information, education, and communication efforts (IEC) and population education; research and evaluation; and project management. Both projects contributed significantly to improving the infrastructure. A brief account of the types and kinds of studies undertaken is given. Studies were grouped into longitudinal studies of fertility, mortality, and FP; management information and evaluation systems for health and family welfare programs; experimental strategies; and other studies. Research and evaluation studies in IPP-III encompassed studies in gaps in knowledge, skills, and practice of health and FP personnel; baseline and endline surveys; and operational evaluation of the management information and evaluation system; factors affecting primary health care in Gulbarga district; evaluation of radio health lessons and the impact of the Kalyana Matha Program; and studies of vaccination and child survival and maternal mortality. Training programs were also undertaken.
The ALMA CONOPS project: the impact of funding decisions on observatory performance
NASA Astrophysics Data System (ADS)
Ibsen, Jorge; Hibbard, John; Filippi, Giorgio
2014-08-01
In time when every penny counts, many organizations are facing the question of how much scientific impact a budget cut can have or, putting it in more general terms, which is the science impact of alternative (less costly) operational modes. In reply to such question posted by the governing bodies, the ALMA project had to develop a methodology (ALMA Concepts for Operations, CONOPS) that attempts to measure the impact that alternative operational scenarios may have on the overall scientific production of the Observatory. Although the analysis and the results are ALMA specific, the developed approach is rather general and provides a methodology for a cost-performance analysis of alternatives before any radical alterations to the operations model are adopted. This paper describes the key aspects of the methodology: a) the definition of the Figures of Merit (FoMs) for the assessment of quantitative science performance impacts as well as qualitative impacts, and presents a methodology using these FoMs to evaluate the cost and impact of the different operational scenarios; b) the definition of a REFERENCE operational baseline; c) the identification of Alternative Scenarios each replacing one or more concepts in the REFERENCE by a different concept that has a lower cost and some level of scientific and/or operational impact; d) the use of a Cost-Performance plane to graphically combine the effects that the alternative scenarios can have in terms of cost reduction and affected performance. Although is a firstorder assessment, we believe this approach is useful for comparing different operational models and to understand the cost performance impact of these choices. This can be used to take decision to meet budget cuts as well as in evaluating possible new emergent opportunities.
Requirements and applications for robotic servicing of military space systems
NASA Technical Reports Server (NTRS)
Ledford, Otto C., Jr.; Bennett, Rodney G.
1992-01-01
The utility of on-orbit servicing of spacecraft has been demonstrated by NASA several times using shuttle-based astronaut EVA. There has been interest in utilizing on-orbit servicing for military space systems as well. This interest has been driven by the increasing reliance of all branches of the military upon space-based assets, the growing numbers, complexity, and cost of those assets, and a desire to normalize support policies for space-based operations. Many military satellites are placed in orbits which are unduly hostile for astronaut operations and/or cannot be reached by the shuttle. In addition, some of the projected tasks may involve hazardous operations. This has led to a focus on robotic systems, instead of astronauts, for the basis of projected servicing systems. This paper describes studies and activities which will hopefully lead to on-orbit servicing being one of the tools available to military space systems designers and operators. The utility of various forms of servicing has been evaluated for present and projected systems, critical technologies have been identified, and strategies for the development and insertion of this technology into operational systems have been developed. Many of the projected plans have been adversely affected by budgetary restrictions and evolving architectures, but the fundamental benefits and requirements are well understood. A method of introducing servicing capabilities in a manner which has a low impact on the system designer and does not require the prior development of an expensive infrastructure is discussed. This can potentially lead to an evolutionary implementation of the full technology.
An evaluation of the feedback loops in the poverty focus of world bank operations.
Fardoust, Shahrokh; Kanbur, Ravi; Luo, Xubei; Sundberg, Mark
2018-04-01
The World Bank Group in 2013 made the elimination of extreme poverty by 2030 a central institutional focus and purpose. This paper, based on an evaluation conducted by the Independent Evaluation Group of the World Bank Group, examines how, and how well, the Bank uses feedback loops to enhance the poverty focus of its operations. Feedback loops are important for every element of the results chain running from data, to diagnostics, to strategy formulation and finally to strategy implementation. The evaluation uses a range of instruments, including surveys of stakeholders and World Bank staff, focus group meetings, country case studies and systematic reviews of Bank lending and non-lending operations. We find that while the Bank generates useful information on poverty reduction from its projects and programs, the feedback loops - from outcomes to data analysis to diagnostics to strategy formulation and implementation - have generally been weak, with sizable variation across countries. Copyright © 2017 The World Bank. Published by Elsevier Ltd.. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Leib, Thomas; Cole, Dan
In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture andmore » Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO 2) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO 2 generated in a large industrial gasification process and sequester the CO 2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials, construction labor, engineering, and other costs. The CCS Project Final Technical Report is based on a Front End Engineering and Design (FEED) study prepared by SK E&C, completed in [June] 2014. Subsequently, Fluor Enterprises completed a FEED validation study in mid-September 2014. The design analyses indicated that the FEED package was sufficient and as expected. However, Fluor considered the construction risk based on a stick-build approach to be unacceptable, but construction risk would be substantially mitigated through utilization of modular construction where site labor and schedule uncertainty is minimized. Fluor’s estimate of the overall EPC project cost utilizing the revised construction plan was comparable to SKE&C’s value after reflecting Fluor’s assessment of project scope and risk characteristic. Development was halted upon conclusion of Phase 2A FEED and the project was not constructed.Transport and Sequestration – The overall objective of the pipeline project was to construct a pipeline to transport captured CO 2 from the Lake Charles Clean Energy project to the existing Denbury Green Line and then to the Hastings Field in Southeast Texas to demonstrate effective geologic sequestration of captured CO 2 through commercial EOR operations. The overall objective of the MVA portion of the project was to demonstrate effective geologic sequestration of captured CO 2 through commercial Enhanced Oil Recovery (EOR) operations in order to evaluate costs, operational processes and technical performance. The DOE target for the project was to capture and implement a research MVA program to demonstrate the sequestration through EOR of approximately one million tons of CO 2 per year as an integral component of commercial operations.« less
The Habitat Demonstration Unit Project Overview
NASA Technical Reports Server (NTRS)
Kennedy, Kriss J.; Grill, Tracy R.; Tri, Terry O.; Howe, Alan S.
2010-01-01
This paper will describe an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) Project. The HDU project is a "technology-pull" project that integrates technologies and innovations from numerous NASA centers. This project will be used to investigate and validate surface architectures, operations concepts, and requirements definition of various habitation concepts. The first habitation configuration this project will build and test is the Pressurized Excursion Module (PEM). This habitat configuration - the PEM - is based on the Constellation Architecture Scenario 12.1 concept of a vertically oriented habitat module. The HDU project will be tested as part of the 2010 Desert Research and Technologies Simulations (D-RATS) test objectives. The purpose of this project is to develop, integrate, test, and evaluate a habitat configuration in the context of the mission architectures and surface operation concepts. A multi-center approach will be leveraged to build, integrate, and test the PEM through a shared collaborative effort of multiple NASA centers. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Lunar Surface Systems Project Office (LSSPO) to test surface elements in a surface analog environment. The 2010 analog field test will include two Lunar Electric Rovers (LER) and the PEM among other surface demonstration elements. This paper will describe the overall objectives, its various habitat configurations, strategic plan, and technology integration as it pertains to the 2010 and 2011 field analog tests. To accomplish the development of the PEM from conception in June 2009 to rollout for operations in July 2010, the HDU project team is using a set of design standards to define the interfaces between the various systems of PEM and to the payloads, such as the Geology Lab, that those systems will support. Scheduled activities such as early fit-checks and the utilization of a habitat avionics test bed prior to equipment installation into PEM are planned to facilitate the integration process.
History of the Federal Interagency Sedimentation Project
Skinner, John V.
1989-01-01
Since 1939, the date of the Project's inception, the team has operated under the direction of two lead agencies - the U.S. Geological Survey and U.S. Army Corps of Engineers. The supporting agencies are the Agricultural Research Service, Bureau of Reclamation, U.S. Forest Service, Bureau of Land Management, Federal Highway Administration, and the Tennessee Valley Authority. Overall direction of the Project rests with the Subcommittee on Sedimentation, Interagency Advisory Committee on Water Data. The Project's goals focus on improving and maintaining the quality of fluvial sediment data by (1) developing sediment samplers, laboratory analyzers, and automatic gages (2) evaluating methods, (3) standardizing equipment and methods and (4) procuring, calibrating and selling equipment.
13 CFR 130.330 - Operating requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... assessment and evaluation, and internal quality control. (c) The Lead Center shall be open to the public... provide administrative services and coordination for the SBDC network, including program development... Project Officer as soon as is feasible. Other SBDC service providers shall be open during the normal...
Management Internship Program: A Model.
ERIC Educational Resources Information Center
Zabezensky, Ferne; And Others
1986-01-01
Examines the Maricopa Community College District's management internship program, detailing the history and operation of the program. Describes program eligibility criteria, the intern's role as Vice Chancellor for Human Services, the provision of a graduate course in management, the rotation of assignments, intern projects, and evaluation.…
Analysis of input variables for a pre-feasibility evaluation model for toll highways
DOT National Transportation Integrated Search
1998-05-01
In recent years, private industry has been more involved in highway financing and operation. Many countries have started to apply new or improved strategies to promote the development of highway projects using sources other than the State. The most w...
FAST DASH: Safety Technology Evaluation Project #1 – Blindspot Warning, 2012
DOT National Transportation Integrated Search
2014-01-01
The purpose of FMCSAs SmartPark initiative is to determine the feasibility of a technology for providing truck parking space availability in real time to truckers on the road. SmartPark consists of two phases. Phase I was a field operational test ...
V.C.3 Technology Validation : Fuel Cell Bus Evaluations
DOT National Transportation Integrated Search
2005-01-06
Based on the results of this analysis and the response from the project partners, the SunLine demonstration was deemed to be a success. Although it was a prototype (or pre-commercial) vehicle, the ThunderPower bus operated in revenue service at a rel...
DOT National Transportation Integrated Search
2015-06-01
Currently, most traffic signals operated by the Virginia Department of Transportation (VDOT) use actuated plans that vary : by time of day (TOD) and day of the week. These timing plans are typically developed off-line using traffic count information ...
NASA Astrophysics Data System (ADS)
Busch, Todd; Gendreau, Michael; Amick, Hal
2005-08-01
The paper examines the methodologies and evaluation criteria advocated by the U.S. Federal Transit Administration (FTA) and Federal Rail Administration (FRA) used to determine whether or not a proposed alignment for a transportation project adversely impacts affected land uses, such as research & development and high-technology manufacturing. The criteria in question are applied as limits on vibration and noise at sensitive receiver locations. Both short-term construction and long-term transportation operations are typically considered, with the latter being the focus of this paper. A case study is presented of a proposed transit system that passes through four different soil zones, the operational characteristics that are required to generate a vibration level equal to the FTA/FRA advocated level of 65 VdB re: 1 micro-inch/sec, and the range of variability of the acceptability of the vibration conditions when considered in terms of third-octave bands compared to vibration criterion (VC) curves that are used as the design performance targets of vibration-sensitive facilities.
1997-11-19
Onboard Space Shuttle Columbia's (STS-87) first ever Extravehicular Activity (EVA), astronaut Takao Doi works with a 156-pound crane carried onboard for the first time. The crane's inclusion and the work with it are part of a continuing preparation effort for future work on the International Space Station (ISS). The ongoing project allows for evaluation of tools and operating methods to be applied to the construction of the Space Station. This crane device is designed to aid future space walkers in transporting Orbital Replacement Units (ORU), with a mass up to 600 pounds (like the simulated battery pictured here), from translating carts on the exterior of ISS to various worksites on the truss structure. Earlier Doi, an international mission specialist representing Japan, and astronaut Winston E. Scott, mission specialist, had installed the crane in a socket along the middle port side of Columbia's cargo bay for the evaluation. The two began the crane operations after completing a contingency EVA to snag the free-flying Spartan 201 and berth it in the payload bay (visible in the background).
Teaching Critical Thinking in Undergraduate Science Courses
NASA Astrophysics Data System (ADS)
Hager, Paul; Sleet, Ray; Logan, Peter; Hooper, Mal
This paper reports on the design and evaluation of a project aimed at fostering the critical thinking abilities and dispositions of first year students at an Australian university. Novel paper and pencil problems were designed to foster the range of critical thinking abilities identified by Ennis (1991). Most of these critical thinking tasks relate to applications of chemistry and physics in everyday life. Some of the tasks were developed from information and/or ideas obtained from critical incident interviews with scientists in private and government organisations. The first year university students were required to attempt the tasks in co-operative groups and to interact in these groups in ways aimed at fostering the dispositions of Ennis' ideal critical thinker (Ennis 1996).The project was evaluated from discussions with groups of students, from comments of tutors who observed the students working in groups and from a questionnaire. Evidence obtained from these data indicated that many students considered their thinking skills were enhanced by their experience of attempting the tasks in small co-operative groups.
Natural Gas Vehicle Cylinder Safety, Training and Inspection Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hank Seiff
2008-12-31
Under the auspices of the National Energy Technology Laboratory and the US Department of Energy, the Clean Vehicle Education Foundation conducted a three-year program to increase the understanding of the safe and proper use and maintenance of vehicular compressed natural gas (CNG) fuel systems. High-pressure fuel systems require periodic inspection and maintenance to insure safe and proper operation. The project addressed the needs of CNG fuel containers (cylinders) and associated high-pressure fuel system components related to existing law, codes and standards (C&S), available training and inspection programs, and assured coordination among vehicle users, public safety officials, fueling station operators andmore » training providers. The program included a public and industry awareness campaign, establishment and administration of a cylinder inspector certification training scholarship program, evaluation of current safety training and testing practices, monitoring and investigation of CNG vehicle incidents, evaluation of a cylinder recertification program and the migration of CNG vehicle safety knowledge to the nascent hydrogen vehicle community.« less
Two-stage commercial evaluation of engineering systems production projects for high-rise buildings
NASA Astrophysics Data System (ADS)
Bril, Aleksander; Kalinina, Olga; Levina, Anastasia
2018-03-01
The paper is devoted to the current and debatable problem of methodology of choosing the effective innovative enterprises for venture financing. A two-stage system of commercial innovation evaluation based on the UNIDO methodology is proposed. Engineering systems account for 25 to 40% of the cost of high-rise residential buildings. This proportion increases with the use of new construction technologies. Analysis of the construction market in Russia showed that the production of internal engineering systems elements based on innovative technologies has a growth trend. The production of simple elements is organized in small enterprises on the basis of new technologies. The most attractive for development is the use of venture financing of small innovative business. To improve the efficiency of these operations, the paper proposes a methodology for a two-stage evaluation of small business development projects. A two-stage system of commercial evaluation of innovative projects allows creating an information base for informed and coordinated decision-making on venture financing of enterprises that produce engineering systems elements for the construction business.
Hydrogen Fuel Cell Performance as Telecommunications Backup Power in the United States
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kurtz, Jennifer; Saur, Genevieve; Sprik, Sam
2015-03-01
Working in collaboration with the U.S. Department of Energy (DOE) and industry project partners, the National Renewable Energy Laboratory (NREL) acts as the central data repository for the data collected from real-world operation of fuel cell backup power systems. With American Recovery and Reinvestment Act of 2009 (ARRA) co-funding awarded through DOE's Fuel Cell Technologies Office, more than 1,300 fuel cell units were deployed over a three-plus-year period in stationary, material handling equipment, auxiliary power, and backup power applications. This surpassed a Fuel Cell Technologies Office ARRA objective to spur commercialization of an early market technology by installing 1,000 fuelmore » cell units across several different applications, including backup power. By December 2013, 852 backup power units out of 1,330 fuel cell units deployed were providing backup service, mainly for telecommunications towers. For 136 of the fuel cell backup units, project participants provided detailed operational data to the National Fuel Cell Technology Evaluation Center for analysis by NREL's technology validation team. NREL analyzed operational data collected from these government co-funded demonstration projects to characterize key fuel cell backup power performance metrics, including reliability and operation trends, and to highlight the business case for using fuel cells in these early market applications. NREL's analyses include these critical metrics, along with deployment, U.S. grid outage statistics, and infrastructure operation.« less
NASA Astrophysics Data System (ADS)
Bader, B. E.
1981-10-01
The principal activities of the Sandia National Laboratories in the Department of Energy Oil shale program during the period April 1 to June 30, 1981 are discussed. Currently, Sandia's activities are focused upon: the development and use of analytical and experimental modeling techniques to describe and predict the retort properties and retorting process parameters that are important to the preparation, operation, and stability of in situ retorts, and the development, deployment, and field use of instrumentation, data acquisition, and process monitoring systems to characterize and evaluate in site up shale oil recovery operations. In-house activities and field activities (at the Geokinetics Oil Shale Project and the Occidental Oil Shale Project) are described under the headings: bed preparation, bed characterization, retorting process, and structural stability.
Research and Development on the Storage Ring Vacuum System for the APS Upgrade Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stillwell, B.; Brajuskovic, B.; Carter, J.
A number of research and development activities are underway at Argonne National Laboratory to build confidence in the designs for the storage ring vacuum system required for the Advanced Photon Source Up-grade project (APS-U) [1]. The predominant technical risks are: excessive residual gas pressures during operation; insufficient beam position monitor stability; excessive beam impedance; excessive heating by induced electrical surface currents; and insufficient operational reliability. Present efforts to mitigate these risks include: building and evaluating mockup assemblies; performing mechanical testing of chamber weld joints; developing computational tools; investigating design alternatives; and performing electrical bench measurements. Status of these activities andmore » some of what has been learned to date will be shared.« less
Evaluation of advanced geopotential models for operational orbit determination
NASA Technical Reports Server (NTRS)
Radomski, M. S.; Davis, B. E.; Samii, M. V.; Engel, C. J.; Doll, C. E.
1988-01-01
To meet future orbit determination accuracy requirements for different NASA projects, analyses are performed using Tracking and Data Relay Satellite System (TDRSS) tracking measurements and orbit determination improvements in areas such as the modeling of the Earth's gravitational field. Current operational requirements are satisfied using the Goddard Earth Model-9 (GEM-9) geopotential model with the harmonic expansion truncated at order and degree 21 (21-by-21). This study evaluates the performance of 36-by-36 geopotential models, such as the GEM-10B and Preliminary Goddard Solution-3117 (PGS-3117) models. The Earth Radiation Budget Satellite (ERBS) and LANDSAT-5 are the spacecraft considered in this study.
NASA Technical Reports Server (NTRS)
Prinzel, Lawrence J., III; Kramer, Lynda J.; Arthur, J. J., III; Bailey, Randall E.; Sweeters, Jason L.
2005-01-01
NASA's Synthetic Vision Systems (SVS) project is developing technologies with practical applications that will help to eliminate low visibility conditions as a causal factor to civil aircraft accidents while replicating the operational benefits of clear day flight operations, regardless of the actual outside visibility condition. The paper describes experimental evaluation of a multi-mode 3-D exocentric synthetic vision navigation display concept for commercial aircraft. Experimental results evinced the situation awareness benefits of 2-D and 3-D exocentric synthetic vision displays over traditional 2-D co-planar navigation and vertical situation displays. Conclusions and future research directions are discussed.
Constellation Mission Operation Working Group: ESMO Maneuver Planning Process Review
NASA Technical Reports Server (NTRS)
Moyer, Eric
2015-01-01
The Earth Science Mission Operation (ESMO) Project created an Independent Review Board to review our Conjunction Risk evaluation process and Maneuver Planning Process to identify improvements that safely manages mission conjunction risks, maintains ground track science requirements, and minimizes overall hours expended on High Interest Events (HIE). The Review Board is evaluating the current maneuver process which requires support by multiple groups. In the past year, there have been several changes to the processes although many prior and new concerns exist. This presentation will discuss maneuver process reviews and Board comments, ESMO assessment and path foward, ESMO future plans, recent changes and concerns.
Center for Ground Vehicle Development and Integration
2011-04-22
UNCLASSIFIED OPSEC# 21798 CGVDI Organizational Chart CGVDI Director Project and Operations Management Project Management Operations Management Engineered...Metals Welding Assembly / Paint UNCLASSIFIED UNCLASSIFIED OPSEC# 21798 Project and Operations Management CGVDI serves as a single entry point to RDECOM...for ground vehicle system integration projects, as well as for managing cost, schedule, performance and risk. Project Management Operations
NASA Technical Reports Server (NTRS)
Marsh, Angela L.; Dudley, Stephanie R. B.
2014-01-01
With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.
NASA Technical Reports Server (NTRS)
Johnson, Charles W.
2011-01-01
The vision of the Unmanned Aircraft System (UAS) Integration in the National Airspace System (NAS) Project is "A global transportation system which allows routine access for all classes of UAS." The goal of the UAS Integration in the NAS Project is to "contribute capabilities that reduce technical barriers related to the safety and operational challenges associated with enabling routine UAS access to the NAS." This goal will be accomplished through a two-phased approach based on development of system-level integration of key concepts, technologies and/or procedures, and demonstrations of integrated capabilities in an operationally relevant environment. Phase 1 will take place the first two years of the Project and Phase 2 will take place the following three years. The Phase 1 and 2 technical objectives are: Phase 1: Developing a gap analysis between current state of the art and the Next Generation Air Transportation System (NextGen) UAS Concept of Operations . Validating the key technical areas identified by this Project . Conducting initial modeling, simulation, and flight testing activities . Completing Sub-project Phase 1 deliverables (spectrum requirements, comparative analysis of certification methodologies, etc.) and continue Phase 2 preparation (infrastructure, tools, etc.) Phase 2: Providing regulators with a methodology for developing airworthiness requirements for UAS, and data to support development of certifications standards and regulatory guidance . Providing systems-level, integrated testing of concepts and/or capabilities that address barriers to routine access to the NAS. Through simulation and flight testing, address issues including separation assurance, communications requirements, and human systems integration in operationally relevant environments. The UAS in the NAS Project will demonstrate solutions in specific technology areas, which will address operational/safety issues related to UAS access to the NAS. Since the resource allocation for this Project is limited ($150M over the five years), the focus is on reducing the technical barriers where NASA has unique capabilities. As a result, technical areas, such as Sense and Avoid (SAA) and beyond line of sight command and control will not be addressed. While these are critical barriers to UAS access, currently, there is a great deal of global effort being exercised to address these challenge areas. Instead, specific technology development in areas where there is certainty that NASA can advance the research to high technology readiness levels will be the Project's focus. Specific sub-projects include Separation Assurance, Human Systems Integration, Communications, Certification, and Integrated Test and Evaluation. Each sub-project will transfer technologies to relevant key stakeholders and decision makers through research transition teams, technology forums, or through other analogous means.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sari Izumo; Hideo Usui; Mitsuo Tachibana
Evaluation models for determining the manpower needs for dismantling various types of equipment in uranium refining and conversion plant (URCP) have been developed. The models are widely applicable to other uranium handling facilities. Additionally, a simplified model was developed for easily and accurately calculating the manpower needs for dismantling dry conversion process-related equipment (DP equipment). It is important to evaluate beforehand project management data such as manpower needs to prepare an optimized decommissioning plan and implement effective dismantling activity. The Japan Atomic Energy Agency (JAEA) has developed the project management data evaluation system for dismantling activities (PRODIA code), which canmore » generate project management data using evaluation models. For preparing an optimized decommissioning plan, these evaluation models should be established based on the type of nuclear facility and actual dismantling data. In URCP, the dry conversion process of reprocessed uranium and others was operated until 1999, and the equipment related to the main process was dismantled from 2008 to 2011. Actual data such as manpower for dismantling were collected during the dismantling activities, and evaluation models were developed using the collected actual data on the basis of equipment classification considering the characteristics of uranium handling facility. (authors)« less
NASA Technical Reports Server (NTRS)
2004-01-01
The primary goal of Access 5 is to allow safe, reliable and routine operations of High Altitude-Long Endurance Remotely Operated Aircraft (HALE ROAs) within the National Airspace System (NAS). Step 1 of Access 5 addresses the policies, procedures, technologies and implementation issues of introducing such operations into the NAS above pressure altitude 40,000 ft (Flight Level 400 or FL400). Routine HALE ROA activity within the NAS represents a potentially significant change to the tasks and concerns of NAS users, service providers and other stakeholders. Due to the complexity of the NAS, and the importance of maintaining current high levels of safety in the NAS, any significant changes must be thoroughly evaluated prior to implementation. The Access 5 community has been tasked with performing this detailed evaluation of routine HALE-ROA activities in the NAS, and providing to key NAS stakeholders a set of recommended policies and procedures to achieve this goal. Extensive simulation, in concert with a directed flight demonstration program are intended to provide the required supporting evidence that these recommendations are based on sound methods and offer a clear roadmap to achieving safe, reliable and routine HALE ROA operations in the NAS. Through coordination with NAS service providers and policy makers, and with significant input from HALE-ROA manufacturers, operators and pilots, this document presents the detailed simulation plan for Step 1 of Access 5. A brief background of the Access 5 project will be presented with focus on Steps 1 and 2, concerning HALE-ROA operations above FL400 and FL180 respectively. An overview of project management structure follows with particular emphasis on the role of the Simulation IPT and its relationships to other project entities. This discussion will include a description of work packages assigned to the Simulation IPT, and present the specific goals to be achieved for each simulation work package, along with the associated deliverables necessary to achieve these goals and the needs of other Access 5 IPTs. The simulation environment chosen for this task is then outlined. This section includes a description of the system architecture, a list of the necessary assumptions made by the Simulation IPT, and the roles, responsibilities and interactions of simulation participants. The method of simulation conduct is presented in the next section with particular emphasis on scenario development and applicability to evaluation of Step 1 HALE-ROA operations. Following, data collection and analysis methods are discussed for air traffic specialists and air vehicle control station operators. Lastly, a schedule of Step 1 simulation activities is presented for reference.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boe, Stephen J.; Lofy, Peter T.
2003-03-01
This is the third annual report of a multi-year project to operate adult collection and juvenile acclimation facilities on Catherine Creek and the upper Grande Ronde River for Snake River spring chinook salmon. These two streams have historically supported populations that provided significant tribal and non-tribal fisheries. Supplementation using conventional and captive broodstock techniques is being used to restore fisheries in these streams. Statement of Work Objectives for 2000: (1) Participate in implementation of the comprehensive multiyear operations plan for the Grande Ronde Endemic Spring Chinook Supplementation Program (GRESCP). (2) Plan for recovery of endemic summer steelhead populations in Catherinemore » Creek and the upper Grande Ronde River. (3) Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2000. (4) Collect summer steelhead. (5) Collect adult endemic spring chinook salmon broodstock. (6) Acclimate juvenile spring chinook salmon prior to release into the upper Grande Ronde River and Catherine Creek. (7) Document accomplishments and needs to permitters, comanagers, and funding agency. (8) Communicate project results to the scientific community. (9) Plan detailed GRESCP Monitoring and Evaluation for future years. (10) Monitor adult population abundance and characteristics of Grande Ronde River spring chinook salmon populations and incidentally-caught summer steelhead and bull trout. (11) Monitor condition, movement, and mortality of spring chinook salmon acclimated at remote facilities. (12) Monitor water quality at facilities. (13) Participate in Monitoring & Evaluation of the captive brood component of the Program to document contribution to the Program.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boe, Stephen J.; Lofy, Peter T.
2002-11-01
This is the second annual report of a multi-year, multi-agency project to restore spring chinook salmon populations in the Grande Ronde River Basin (Grande Ronde Endemic Chinook Salmon Program--GRESCP). The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) operates adult collection and juvenile acclimation facilities on Catherine Creek and the upper Grande Ronde River for Snake River spring chinook salmon. These two streams have historically supported populations that provided significant tribal and non-tribal fisheries. Supplementation using conventional and captive broodstock techniques is being used to increase natural production and restore fisheries in these two streams. Statement of Work Objectives formore » 1999: (1) Participate in development and continued implementation of the comprehensive multi year operations plan for the Grande Ronde Endemic Supplementation Program. (2) Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2000. (3) Monitor adult endemic spring chinook salmon populations and collect broodstock. (4) Plan detailed Monitoring and Evaluation for future years. (5) Monitor population abundance and characteristics and local environmental factors that may influence abundance and run timing of Grande Ronde River spring chinook populations. (6) Participate in Monitoring and Evaluation of the captive brood component of the Program to assure this component is contributing to the Program. (7) Participate in data collection for incidentally-caught bull trout and summer steelhead and planning for recovery of summer steelhead populations. (8) Document accomplishments and needs to permitters, comanagers, and funding agencies. (9) Communicate project results to the scientific community.« less
Total and Spectral Solar Irradiance Sensor (TSIS) Project Status
NASA Technical Reports Server (NTRS)
Carlisle, Candace
2018-01-01
TSIS-1 studies the Sun's energy input to Earth and how solar variability affects climate. TSIS-1 will measure both the total amount of light that falls on Earth, known as the total solar irradiance (TSI), and how that light is distributed among ultraviolet, visible and infrared wavelengths, called solar spectral irradiance (SSI). TSIS-1 will provide the most accurate measurements of sunlight and continue the long-term climate data record. TSIS-1 includes two instruments: the Total Irradiance Monitor (TIM) and the Spectral Irradiance Monitor (SIM), integrated into a single payload on the International Space Station (ISS). The TSIS-1 TIM and SIM instruments are upgraded versions of the two instruments that are flying on the Solar Radiation and Climate Experiment (SORCE) mission launched in January 2003. NASA Goddard's TSIS project responsibilities include project management, system engineering, safety and mission assurance, and engineering oversight for TSIS-1. TSIS-1 was installed on the International Space Station in December 2017. At the end of the 90-day commissioning phase, responsibility for TSIS-1 operations transitions to the Earth Science Mission Operations (ESMO) project at Goddard for its 5-year operations. NASA contracts with the University of Colorado Laboratory for Atmospheric and Space Physics (LASP) for the design, development and testing of TSIS-1, support for ISS integration, science operations of the TSIS-1 instrument, data processing, data evaluation, calibration and delivery to the Goddard Earth Science Data and Information Services Center (GES DISC).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sullivan, Kevin; Anasti, William; Fang, Yichuan
The main purpose of this project is to look at technologies and philosophies that would help reduce the costs of an Integrated Gasification Combined Cycle (IGCC) plant, increase its availability or do both. GE’s approach to this problem is to consider options in three different areas: 1) technology evaluations and development; 2) constructability approaches; and 3) design and operation methodologies. Five separate tasks were identified that fall under the three areas: Task 2 – Integrated Operations Philosophy; Task 3 – Slip Forming of IGCC Components; Task 4 – Modularization of IGCC Components; Task 5 – Fouling Removal; and Task 6more » – Improved Slag Handling. Overall, this project produced results on many fronts. Some of the ideas could be utilized immediately by those seeking to build an IGCC plant in the near future. These include the considerations from the Integrated Operations Philosophy task and the different construction techniques of Slip Forming and Modularization (especially if the proposed site is in a remote location or has a lack of a skilled workforce). Other results include ideas for promising technologies that require further development and testing to realize their full potential and be available for commercial operation. In both areas GE considers this project to be a success in identifying areas outside the core IGCC plant systems that are ripe for cost reduction and ity improvement opportunities.« less
Ventre, Kathleen M; Barry, James S; Davis, Deborah; Baiamonte, Veronica L; Wentworth, Allen C; Pietras, Michele; Coughlin, Liza; Barley, Gwyn
2014-04-01
Relocating obstetric (OB) services to a children's hospital imposes demands on facility operations, which must be met to ensure quality care and a satisfactory patient experience. We used in situ simulations to prospectively and iteratively evaluate operational readiness of a children's hospital-based OB unit before it opened for patient care. This project took place at a 314-bed, university-affiliated children's hospital. We developed 3 full-scale simulation scenarios depicting a concurrent maternal and neonatal emergency. One scenario began with a standardized patient experiencing admission; the mannequin portrayed a mother during delivery. We ran all 3 scenarios on 2 dates scheduled several weeks apart. We ran 2 of the scenarios on a third day to verify the reliability of key processes. During the simulations, content experts completed equipment checklists, and participants identified latent safety hazards. Each simulation involved a unique combination of scheduled participants who were supplemented by providers from responding ancillary services. The simulations involved 133 scheduled participants representing OB, neonatology, and anesthesiology. We exposed and addressed operational deficiencies involving equipment availability, staffing, interprofessional communication, and systems issues such as transfusion protocol failures and electronic order entry challenges. Process changes between simulation days 1 to 3 decreased the elapsed time between transfusion protocol activation and blood arrival to the operating room and labor/delivery/recovery/postpartum setting. In situ simulations identified multiple operational deficiencies on the OB unit, allowing us to take corrective action before its opening. This project may guide other children's hospitals regarding care processes likely to require significant focus and possible modification to accommodate an OB service.
A School Finance Computer Simulation Model
ERIC Educational Resources Information Center
Boardman, Gerald R.
1974-01-01
Presents a description of the computer simulation model developed by the National Educational Finance Project for use by States in planning and evaluating alternative approaches for State support programs. Provides a general introduction to the model, a program operation overview, a sample run, and some conclusions. (Author/WM)
Since 2010, the State of California has required construction operators to utilize the electronic Storm Water Application and Report Tracking System (SMARTS) for construction projects covered by the General Construction Permit. The General Construction permit encourages BMP and G...
I.T.S. camera deployment and systems integration P.I.N. 4ITV.09.121 : evaluation
DOT National Transportation Integrated Search
2006-08-01
The Monroe County Department of Transportation (MCDOT) has built upon the success of its first computerized traffic signal system. The system has been operational since 1985. In the late 1990s the Department initiated a project to integrate Intell...
DOT National Transportation Integrated Search
1990-01-01
This project was initiated at the request of the Department of Motor Vehicles as a response to House Joint Resolution 378 (1989). The resolution requested an evaluation of research studies on ignition interlocks and a determination of possible benefi...
Development of a dynamic traffic assignment model to evaluate lane-reversal plans for I-65.
DOT National Transportation Integrated Search
2010-05-01
This report presents the methodology and results from a project that studied contra-flow operations in support of : hurricane evacuations in the state of Alabama. As part of this effort, a simulation model was developed using the : VISTA platform for...
DOT National Transportation Integrated Search
2018-01-01
This project was initiated by the ODOT District 2 staff who were looking for more efficient ways to heat and operate their maintenance facilities. This especially applied to the idea of using radiant floor heating as an alternative to todays stand...
NASA Astrophysics Data System (ADS)
Korytárová, J.; Vaňková, L.
2017-10-01
Paper builds on previous research of the authors into the evaluation of economic efficiency of transport infrastructure projects evaluated by the economic efficiency ratio - NPV, IRR and BCR. Values of indicators and subsequent outputs of the sensitivity analysis show extremely favourable values in some cases. The authors dealt with the analysis of these indicators down to the level of the input variables and examined which inputs have a larger share of these extreme values. NCF for the calculation of above mentioned ratios is created by benefits that arise as the difference between zero and investment options of the project (savings in travel and operating costs, savings in travel time costs, reduction in accident costs and savings in exogenous costs) as well as total agency costs. Savings in travel time costs which contribute to the overall utility of projects by more than 70% appear to be the most important benefits in the long term horizon. This is the reason why this benefit emphasized. The outcome of the article has resulted how the particular basic variables contributed to the total robustness of economic efficiency of these project.
1989-10-01
Operating Systems for Mission-Critical Computing, (Sept. 1989) J1-J7. (12) Son, S. H. and N. Haghighi, "Performance Evaluation of Multiversion Database...Hungary, (Oct. 1989), to appear. (14) Son, S. H. and Y. Kim, "A Software Prototyping Environment and Its Use in Developing a Multiversion Distributed...University of Virginia, (Aug. 1989). (23) Son, S. H. and N. Haghighi, "Performance Evaluation of Multiversion Database Systems," Technical Report IPC
ERIC Educational Resources Information Center
Crummer, Karen; And Others
Based on on-site review team visits conducted during spring 1982, this report evaluates the Educational Campus Child Development Centers (CCDC's) operating at 9 to the 10 campuses in the Los Angeles Community College District (LACCD). After introducing the evaluation project and its participants, the report outlines the educational philosophy of…
Evaluating Army Aviation’s Force Structure to Support an Operational Reserve Force
2011-03-21
partial fulfillment of the requirements of the Master of Strategic Studies Degree. The views expressed in this student academic research paper are...Higher Education Accreditation. The views expressed in this student academic research paper are those of the author and do not reflect the official...Strategy Research Project 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Evaluating Army Aviation’s Force Structure to Support an
Pathway Design Effects on Synthetic Vision Head-Up Displays
NASA Technical Reports Server (NTRS)
Kramer, Lynda J.; Prinzel, Lawrence J., III; Arthur, Jarvis J., III; Bailey, Randall E.
2004-01-01
NASA s Synthetic Vision Systems (SVS) project is developing technologies with practical applications that will eliminate low visibility conditions as a causal factor to civil aircraft accidents while replicating the operational benefits of clear day flight operations, regardless of the actual outside visibility condition. A major thrust of the SVS project involves the development/demonstration of affordable, certifiable display configurations that provide intuitive out-the-window terrain and obstacle information with advanced pathway guidance for transport aircraft. This experiment evaluated the influence of different tunnel and guidance concepts upon pilot situation awareness (SA), mental workload, and flight path tracking performance for Synthetic Vision display concepts using a Head-Up Display (HUD). Two tunnel formats (dynamic, minimal) were evaluated against a baseline condition (no tunnel) during simulated IMC approaches to Reno-Tahoe International airport. Two guidance cues (tadpole, follow-me aircraft) were also evaluated to assess their influence on the tunnel formats. Results indicated that the presence of a tunnel on an SVS HUD had no effect on flight path performance but that it did have significant effects on pilot SA and mental workload. The dynamic tunnel concept with the follow-me aircraft guidance symbol produced the lowest workload and provided the highest SA among the tunnel concepts evaluated.
Advanced exterior sensor project : final report, September 2004.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ashby, M. Rodema
2004-12-01
This report (1) summarizes the overall design of the Advanced Exterior Sensor (AES) system to include detailed descriptions of system components, (2) describes the work accomplished throughout FY04 to evaluate the current health of the original prototype and to return it to operation, (3) describes the status of the AES and the AES project as of September 2004, and (4) details activities planned to complete modernization of the system to include development and testing of the second-generation AES prototype.
Evaluation of an LED Retrofit Project at Princeton University's Carl Icahn Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Davis, Robert; Murphy, Arthur; Perrin, Tess
At Princeton University’s Carl Icahn Laboratory, DOE’s Commercial Buildings Integration Program documented the implementation of LED retrofit products for recessed troffers, linear cove lighting, and downlights – as part of Princeton’s first building-wide interior LED project. The conversion to LED enables more extensive use of lighting controls to tailor the lighting to the task and limit the operating hours based on occupancy, and the estimated energy savings including controls is 62% compared to the incumbent system.
2015-03-26
SYSTEMS THESIS Presented to the Faculty Department of Aeronautics and Astronautics Graduate School of Engineering and Management Air Force Institute...Geolocation (SAMSON) project , led by the Distributed Space Systems Lab and the Asher Space Research Institute at the Technion-Israel Institute of...Technology, is an operationally focused CubeSat mission that is scheduled to launch in 2016. The goals of the SAMSON project are to demon- strate long-term
Trowbridge, Matthew J; Pickell, Sarah Gauche; Pyke, Christopher R; Jutte, Douglas P
2014-11-01
It is increasingly well recognized that the design and operation of the communities in which people live, work, learn, and play significantly influence their health. However, within the real estate industry, the health impacts of transportation, community development, and other construction projects, both positive and negative, continue to operate largely as economic externalities: unmeasured, unregulated, and for the most part unconsidered. This lack of transparency limits communities' ability to efficiently advocate for real estate investment that best promotes their health and well-being. It also limits market incentives for innovation within the real estate industry by making it more difficult for developers that successfully target health behaviors and outcomes in their projects to differentiate themselves competitively. In this article we outline the need for actionable, community-relevant, practical, and valuable metrics jointly developed by the health care and real estate sectors to better evaluate and optimize the "performance" of real estate development projects from a population health perspective. Potential templates for implementation, including the successful introduction of sustainability metrics by the green building movement, and preliminary data from selected case-study projects are also discussed. Project HOPE—The People-to-People Health Foundation, Inc.
Portable Virtual Training Units
NASA Technical Reports Server (NTRS)
Malone, Reagan; Johnston, Alan
2015-01-01
The Mission Operations Lab initiated a project to design, develop, deliver, test, and validate a unique training system for astronaut and ground support personnel. In an effort to keep training costs low, virtual training units (VTUs) have been designed based on images of actual hardware and manipulated by a touch screen style interface for ground support personnel training. This project helped modernized the training system and materials by integrating them with mobile devices for training when operators or crew are unavailable to physically train in the facility. This project also tested the concept of a handheld remote device to control integrated trainers using International Space Station (ISS) training simulators as a platform. The portable VTU can interface with the full-sized VTU, allowing a trainer co-located with a trainee to remotely manipulate a VTU and evaluate a trainee's response. This project helped determine if it is useful, cost effective, and beneficial for the instructor to have a portable handheld device to control the behavior of the models during training. This project has advanced NASA Marshall Space Flight Center's (MSFC's) VTU capabilities with modern and relevant technology to support space flight training needs of today and tomorrow.
Output Control Technologies for a Large-scale PV System Considering Impacts on a Power Grid
NASA Astrophysics Data System (ADS)
Kuwayama, Akira
The mega-solar demonstration project named “Verification of Grid Stabilization with Large-scale PV Power Generation systems” had been completed in March 2011 at Wakkanai, the northernmost city of Japan. The major objectives of this project were to evaluate adverse impacts of large-scale PV power generation systems connected to the power grid and develop output control technologies with integrated battery storage system. This paper describes the outline and results of this project. These results show the effectiveness of battery storage system and also proposed output control methods for a large-scale PV system to ensure stable operation of power grids. NEDO, New Energy and Industrial Technology Development Organization of Japan conducted this project and HEPCO, Hokkaido Electric Power Co., Inc managed the overall project.
Albeni Falls Wildlife Protection, Mitigation, and Enhancement Plan, Final Report 1987.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Martin, Robert C.
1988-08-01
A wildlife impact assessment and mitigation plan has been developed for the US Army Corps of Engineers Albeni Falls Project in northern Idaho. The Habitat Evaluation Procedure (HEP) was used to evaluate pre- and post-construction habitat conditions at the Albeni Falls Project. There were 6617 acres of wetlands converted to open water due to development and operation of the project. Eight evaluation species were selected with impacts expressed in numbers of Habitat Units (HU's). For a given species, one HU is equivalent to one acre of prime habitat. The Albeni Falls Project resulted in estimated losses of 5985 mallard HU's,more » 4699 Canada goose HU's, 3379 redhead HU's, 4508 breeding bald eagle HU's, 4365 wintering bald eagle HU's, 2286 black-capped chickadee HU's, 1680 white-tailed deer HU's, and 1756 muskrat HU's. The yellow warbler gained 71 HU's. Therefore, total target species estimated impacts were 28,587 HU's. Impacts on peregrine falcons were not quantified in terms of HU's. Projects have been proposed by an interagency team of biologists to mitigate the impacts of Albeni Falls on wildlife. The HEP was used to estimate benefits of proposed mitigation projects to target species. Through a series of proposed protection and enhancement actions, the mitigation plan will provide benefits of an estimated 28,590 target species HU's to mitigate Albeni Falls wildlife habitat values lost. 52 refs., 9 figs., 14 tabs.« less
NASA Technical Reports Server (NTRS)
Gong, Chester; Wu, Minghong G.; Santiago, Confesor
2016-01-01
The Unmanned Aircraft Systems Integration in the National Airspace System project, or UAS Integration in the NAS, aims to reduce technical barriers related to safety and operational challenges associated with enabling routine UAS access to the NAS. The UAS Integration in the NAS Project conducted a flight test activity, referred to as Flight Test 3 (FT3), involving several Detect-and-Avoid (DAA) research prototype systems between June 15, 2015 and August 12, 2015 at the Armstrong Flight Research Center (AFRC). This report documents the flight testing and analysis results for the NASA Ames-developed JADEM-Autoresolver DAA system, referred to as 'Autoresolver' herein. Four flight test days (June 17, 18, 22, and July 22) were dedicated to Autoresolver testing. The objectives of this test were as follows: 1. Validate CPA prediction accuracy and detect-and-avoid (DAA, formerly known as self-separation) alerting logic in realistic flight conditions. 2. Validate DAA trajectory model including maneuvers. 3. Evaluate TCAS/DAA interoperability. 4. Inform final Minimum Operating Performance Standards (MOPS). Flight test scenarios were designed to collect data to directly address the objectives 1-3. Objective 4, inform final MOPS, was a general objective applicable to the UAS in the NAS project as a whole, of which flight test is a subset. This report presents analysis results completed in support of the UAS in the NAS project FT3 data review conducted on October 20, 2015. Due to time constraints and, to a lesser extent, TCAS data collection issues, objective 3 was not evaluated in this analysis.
NASA Technical Reports Server (NTRS)
Dudley, Stephanie R. B.; Marsh, Angela L.
2014-01-01
With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.
ATD-1 Avionics Phase 2 Flight Test: Flight Test Operations and Saftey Report (FTOSR)
NASA Technical Reports Server (NTRS)
Boyle, Dan; Rein-Weston, Karl; Berckefeldt, Rick; Eggling, Helmuth; Stankiewicz, Craig; Silverman, George
2017-01-01
The Air Traffic Management Technology Demonstration-1 (ATD-1) is a major applied research and development activity of NASA's Airspace Operations and Safety Program (AOSP). The demonstration is the first of an envisioned series of Air Traffic Management (ATM) Technology Demonstration sub-projects that will demonstrate innovative NASA technologies that have attained a sufficient level of maturity to merit more in-depth research and evaluation at the system level in relevant environments.