Kennedy Space Center Orion Processing Team Planning for Ground Operations
NASA Technical Reports Server (NTRS)
Letchworth, Gary; Schlierf, Roland
2011-01-01
Topics in this presentation are: Constellation Ares I/Orion/Ground Ops Elements Orion Ground Operations Flow Orion Operations Planning Process and Toolset Overview, including: 1 Orion Concept of Operations by Phase 2 Ops Analysis Capabilities Overview 3 Operations Planning Evolution 4 Functional Flow Block Diagrams 5 Operations Timeline Development 6 Discrete Event Simulation (DES) Modeling 7 Ground Operations Planning Document Database (GOPDb) Using Operations Planning Tools for Operability Improvements includes: 1 Kaizen/Lean Events 2 Mockups 3 Human Factors Analysis
Salehi, Mojtaba; Bahreininejad, Ardeshir
2011-08-01
Optimization of process planning is considered as the key technology for computer-aided process planning which is a rather complex and difficult procedure. A good process plan of a part is built up based on two elements: (1) the optimized sequence of the operations of the part; and (2) the optimized selection of the machine, cutting tool and Tool Access Direction (TAD) for each operation. In the present work, the process planning is divided into preliminary planning, and secondary/detailed planning. In the preliminary stage, based on the analysis of order and clustering constraints as a compulsive constraint aggregation in operation sequencing and using an intelligent searching strategy, the feasible sequences are generated. Then, in the detailed planning stage, using the genetic algorithm which prunes the initial feasible sequences, the optimized operation sequence and the optimized selection of the machine, cutting tool and TAD for each operation based on optimization constraints as an additive constraint aggregation are obtained. The main contribution of this work is the optimization of sequence of the operations of the part, and optimization of machine selection, cutting tool and TAD for each operation using the intelligent search and genetic algorithm simultaneously.
Salehi, Mojtaba
2010-01-01
Optimization of process planning is considered as the key technology for computer-aided process planning which is a rather complex and difficult procedure. A good process plan of a part is built up based on two elements: (1) the optimized sequence of the operations of the part; and (2) the optimized selection of the machine, cutting tool and Tool Access Direction (TAD) for each operation. In the present work, the process planning is divided into preliminary planning, and secondary/detailed planning. In the preliminary stage, based on the analysis of order and clustering constraints as a compulsive constraint aggregation in operation sequencing and using an intelligent searching strategy, the feasible sequences are generated. Then, in the detailed planning stage, using the genetic algorithm which prunes the initial feasible sequences, the optimized operation sequence and the optimized selection of the machine, cutting tool and TAD for each operation based on optimization constraints as an additive constraint aggregation are obtained. The main contribution of this work is the optimization of sequence of the operations of the part, and optimization of machine selection, cutting tool and TAD for each operation using the intelligent search and genetic algorithm simultaneously. PMID:21845020
Automating Space Station operations planning
NASA Technical Reports Server (NTRS)
Ziemer, Kathleen A.
1989-01-01
The development and implementation of the operations planning processes for the Space Station are discussed. A three level planning process, consisting of strategic, tactical, and execution level planning, is being developed. The integration of the planning procedures into a tactical planning system is examined and the planning phases are illustrated.
2004-06-01
Situation Understanding) Common Operational Pictures Planning & Decision Support Capabilities Message & Order Processing Common Operational...Pictures Planning & Decision Support Capabilities Message & Order Processing Common Languages & Data Models Modeling & Simulation Domain
Benefits to blood banks of a sales and operations planning process.
Keal, Donald A; Hebert, Phil
2010-12-01
A formal sales and operations planning (S&OP) process is a decision making and communication process that balances supply and demand while integrating all business operational components with customer-focused business plans that links high level strategic plans to day-to-day operations. Furthermore, S&OP can assist in managing change across the organization as it provides the opportunity to be proactive in the face of problems and opportunities while establishing a plan for everyone to follow. Some of the key outcomes from a robust S&OP process in blood banking would include: higher customer satisfaction (donors and health care providers), balanced inventory across product lines and customers, more stable production rates and higher productivity, more cooperation across the entire operation, and timely updates to the business plan resulting in better forecasting and fewer surprises that negatively impact the bottom line. © 2010 American Association of Blood Banks.
Application of genetic algorithm in integrated setup planning and operation sequencing
NASA Astrophysics Data System (ADS)
Kafashi, Sajad; Shakeri, Mohsen
2011-01-01
Process planning is an essential component for linking design and manufacturing process. Setup planning and operation sequencing is two main tasks in process planning. Many researches solved these two problems separately. Considering the fact that the two functions are complementary, it is necessary to integrate them more tightly so that performance of a manufacturing system can be improved economically and competitively. This paper present a generative system and genetic algorithm (GA) approach to process plan the given part. The proposed approach and optimization methodology analyses the TAD (tool approach direction), tolerance relation between features and feature precedence relations to generate all possible setups and operations using workshop resource database. Based on these technological constraints the GA algorithm approach, which adopts the feature-based representation, optimizes the setup plan and sequence of operations using cost indices. Case study show that the developed system can generate satisfactory results in optimizing the setup planning and operation sequencing simultaneously in feasible condition.
Cooperative optimization of reconfigurable machine tool configurations and production process plan
NASA Astrophysics Data System (ADS)
Xie, Nan; Li, Aiping; Xue, Wei
2012-09-01
The production process plan design and configurations of reconfigurable machine tool (RMT) interact with each other. Reasonable process plans with suitable configurations of RMT help to improve product quality and reduce production cost. Therefore, a cooperative strategy is needed to concurrently solve the above issue. In this paper, the cooperative optimization model for RMT configurations and production process plan is presented. Its objectives take into account both impacts of process and configuration. Moreover, a novel genetic algorithm is also developed to provide optimal or near-optimal solutions: firstly, its chromosome is redesigned which is composed of three parts, operations, process plan and configurations of RMTs, respectively; secondly, its new selection, crossover and mutation operators are also developed to deal with the process constraints from operation processes (OP) graph, otherwise these operators could generate illegal solutions violating the limits; eventually the optimal configurations for RMT under optimal process plan design can be obtained. At last, a manufacturing line case is applied which is composed of three RMTs. It is shown from the case that the optimal process plan and configurations of RMT are concurrently obtained, and the production cost decreases 6.28% and nonmonetary performance increases 22%. The proposed method can figure out both RMT configurations and production process, improve production capacity, functions and equipment utilization for RMT.
A key to success: optimizing the planning process
NASA Astrophysics Data System (ADS)
Turk, Huseyin; Karakaya, Kamil
2014-05-01
By adopting The NATO Strategic Concept Document in 2010, some important changes in the perception of threat and management of crisis were introduced. This new concept, named ''Comprehensive Approach'', includes the precautions of pre-crisis management, applications of crisis-duration management and reconstruction phase of post-intervention management. NATO will be interested in not only the political and military options , but also social, economical and informational aspects of crisis. NATO will take place in all phases of conflict. The conflicts which occur outside the borders of NATO's nations and terrorism are perceived as threat sources for peace and stability. In addition to conventional threats, cyber attacks which threaten network-supported communication systems, preventing applications from accessing to space that will be used in different fields of life. On the other hand, electronic warfare capabilities which can effect us negatively are added to threat list as new threats. In the process in which military is thought as option, a harder planning phase is waiting for NATO's decision makers who struggle for keeping peace and security. Operation planning process which depends on comprehensive approach, contains these steps: Situational awareness of battlefield, evaluation of the military intervention options, orientation, developing an operation plan, reviewing the plan and transition phases.1 To be successful in theater which is always changing with the technological advances, there has to be an accurate and timely planning on the table. So, spending time for planning can be shown as one of the biggest problem. In addition, sustaining situational awareness which is important for the whole operation planning process, technical command and control hitches, human factor, inability to determine the center of gravity of opponent in asymmetrical threat situations can be described as some of the difficulties in operation planning. In this study, a possible air operation planning process is analyzed according to a comprehensive approach. The difficulties of planning are identified. Consequently, for optimizing a decisionmaking process of an air operation, a planning process is identified in a virtual command and control structure.
Fontan Surgical Planning: Previous Accomplishments, Current Challenges, and Future Directions.
Trusty, Phillip M; Slesnick, Timothy C; Wei, Zhenglun Alan; Rossignac, Jarek; Kanter, Kirk R; Fogel, Mark A; Yoganathan, Ajit P
2018-04-01
The ultimate goal of Fontan surgical planning is to provide additional insights into the clinical decision-making process. In its current state, surgical planning offers an accurate hemodynamic assessment of the pre-operative condition, provides anatomical constraints for potential surgical options, and produces decent post-operative predictions if boundary conditions are similar enough between the pre-operative and post-operative states. Moving forward, validation with post-operative data is a necessary step in order to assess the accuracy of surgical planning and determine which methodological improvements are needed. Future efforts to automate the surgical planning process will reduce the individual expertise needed and encourage use in the clinic by clinicians. As post-operative physiologic predictions improve, Fontan surgical planning will become an more effective tool to accurately model patient-specific hemodynamics.
A planning language for activity scheduling
NASA Technical Reports Server (NTRS)
Zoch, David R.; Lavallee, David; Weinstein, Stuart; Tong, G. Michael
1991-01-01
Mission planning and scheduling of spacecraft operations are becoming more complex at NASA. Described here are a mission planning process; a robust, flexible planning language for spacecraft and payload operations; and a software scheduling system that generates schedules based on planning language inputs. The mission planning process often involves many people and organizations. Consequently, a planning language is needed to facilitate communication, to provide a standard interface, and to represent flexible requirements. The software scheduling system interprets the planning language and uses the resource, time duration, constraint, and alternative plan flexibilities to resolve scheduling conflicts.
Health sector operational planning and budgeting processes in Kenya—“never the twain shall meet”
Molyneux, Sassy; Goodman, Catherine
2015-01-01
Summary Operational planning is considered an important tool for translating government policies and strategic objectives into day‐to‐day management activities. However, developing countries suffer from persistent misalignment between policy, planning and budgeting. The Medium Term Expenditure Framework (MTEF) was introduced to address this misalignment. Kenya adopted the MTEF in the early 2000s, and in 2005, the Ministry of Health adopted the Annual Operational Plan process to adapt the MTEF to the health sector. This study assessed the degree to which the health sector Annual Operational Plan process in Kenya has achieved alignment between planning and budgeting at the national level, using document reviews, participant observation and key informant interviews. We found that the Kenyan health sector was far from achieving planning and budgeting alignment. Several factors contributed to this problem including weak Ministry of Health stewardship and institutionalized separation between planning and budgeting processes; a rapidly changing planning and budgeting environment; lack of reliable data to inform target setting and poor participation by key stakeholders in the process including a top‐down approach to target setting. We conclude that alignment is unlikely to be achieved without consideration of the specific institutional contexts and the power relationships between stakeholders. In particular, there is a need for institutional integration of the planning and budgeting processes into a common cycle and framework with common reporting lines and for improved data and local‐level input to inform appropriate and realistic target setting. © 2015 The Authors. International Journal of Health Planning and Management published by John Wiley & Sons, Ltd. PMID:25783862
Health sector operational planning and budgeting processes in Kenya-"never the twain shall meet".
Tsofa, Benjamin; Molyneux, Sassy; Goodman, Catherine
2016-07-01
Operational planning is considered an important tool for translating government policies and strategic objectives into day-to-day management activities. However, developing countries suffer from persistent misalignment between policy, planning and budgeting. The Medium Term Expenditure Framework (MTEF) was introduced to address this misalignment. Kenya adopted the MTEF in the early 2000s, and in 2005, the Ministry of Health adopted the Annual Operational Plan process to adapt the MTEF to the health sector. This study assessed the degree to which the health sector Annual Operational Plan process in Kenya has achieved alignment between planning and budgeting at the national level, using document reviews, participant observation and key informant interviews. We found that the Kenyan health sector was far from achieving planning and budgeting alignment. Several factors contributed to this problem including weak Ministry of Health stewardship and institutionalized separation between planning and budgeting processes; a rapidly changing planning and budgeting environment; lack of reliable data to inform target setting and poor participation by key stakeholders in the process including a top-down approach to target setting. We conclude that alignment is unlikely to be achieved without consideration of the specific institutional contexts and the power relationships between stakeholders. In particular, there is a need for institutional integration of the planning and budgeting processes into a common cycle and framework with common reporting lines and for improved data and local-level input to inform appropriate and realistic target setting. © 2015 The Authors. International Journal of Health Planning and Management published by John Wiley & Sons, Ltd. © 2015 The Authors. International Journal of Health Planning and Management published by John Wiley & Sons, Ltd.
Strategic planning for the International Space Station
NASA Technical Reports Server (NTRS)
Griner, Carolyn S.
1990-01-01
The concept for utilization and operations planning for the International Space Station Freedom was developed in a NASA Space Station Operations Task Force in 1986. Since that time the concept has been further refined to definitize the process and products required to integrate the needs of the international user community with the operational capabilities of the Station in its evolving configuration. The keystone to the process is the development of individual plans by the partners, with the parameters and formats common to the degree that electronic communications techniques can be effectively utilized, while maintaining the proper level and location of configuration control. The integration, evaluation, and verification of the integrated plan, called the Consolidated Operations and Utilization Plan (COUP), is being tested in a multilateral environment to prove out the parameters, interfaces, and process details necessary to produce the first COUP for Space Station in 1991. This paper will describe the concept, process, and the status of the multilateral test case.
Operational Plan Ontology Model for Interconnection and Interoperability
NASA Astrophysics Data System (ADS)
Long, F.; Sun, Y. K.; Shi, H. Q.
2017-03-01
Aiming at the assistant decision-making system’s bottleneck of processing the operational plan data and information, this paper starts from the analysis of the problem of traditional expression and the technical advantage of ontology, and then it defines the elements of the operational plan ontology model and determines the basis of construction. Later, it builds up a semi-knowledge-level operational plan ontology model. Finally, it probes into the operational plan expression based on the operational plan ontology model and the usage of the application software. Thus, this paper has the theoretical significance and application value in the improvement of interconnection and interoperability of the operational plan among assistant decision-making systems.
Hitchhiker mission operations: Past, present, and future
NASA Technical Reports Server (NTRS)
Anderson, Kathryn
1995-01-01
What is mission operations? Mission operations is an iterative process aimed at achieving the greatest possible mission success with the resources available. The process involves understanding of the science objectives, investigation of which system capabilities can best meet these objectives, integration of the objectives and resources into a cohesive mission operations plan, evaluation of the plan through simulations, and implementation of the plan in real-time. In this paper, the authors present a comprehensive description of what the Hitchhiker mission operations approach is and why it is crucial to mission success. The authors describe the significance of operational considerations from the beginning and throughout the experiment ground and flight systems development. The authors also address the necessity of training and simulations. Finally, the authors cite several examples illustrating the benefits of understanding and utilizing the mission operations process.
Supply Operations (DLA-O) Total Quality Management (TQM) Master Plan
1989-07-01
This document briefly outlines the DLA Directorate of Supply Operations plan to implement total quality management . It seeks to provide better...service to customers at a lower cost through continuous process improvement and commitment from everyone in the organization. Keywords: TQM (total Quality Management ), Supply operations; Continuous process improvement. (KR)
Spacelab operations planning. [ground handling, launch, flight and experiments
NASA Technical Reports Server (NTRS)
Lee, T. J.
1976-01-01
The paper reviews NASA planning in the fields of ground, launch and flight operations and experiment integration to effectively operate Spacelab. Payload mission planning is discussed taking consideration of orbital analysis and the mission of a multiuser payload which may be either single or multidiscipline. Payload analytical integration - as active process of analyses to ensure that the experiment payload is compatible to the mission objectives and profile ground and flight operations and that the resource demands upon Spacelab can be satisfied - is considered. Software integration is touched upon and the major integration levels in ground operational processing of Spacelab and its experimental payloads are examined. Flight operations, encompassing the operation of the Space Transportation System and the payload, are discussed as are the initial Spacelab missions. Charts and diagrams are presented illustrating the various planning areas.
NASA Technical Reports Server (NTRS)
Maxwell, Theresa G.; McNair, Ann R. (Technical Monitor)
2002-01-01
The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The "pieces" are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.
NASA Technical Reports Server (NTRS)
Maxwell, Theresa G.
2002-01-01
The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The pieces are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.
Development of a plan for automating integrated circuit processing
NASA Technical Reports Server (NTRS)
1971-01-01
The operations analysis and equipment evaluations pertinent to the design of an automated production facility capable of manufacturing beam-lead CMOS integrated circuits are reported. The overall plan shows approximate cost of major equipment, production rate and performance capability, flexibility, and special maintenance requirements. Direct computer control is compared with supervisory-mode operations. The plan is limited to wafer processing operations from the starting wafer to the finished beam-lead die after separation etching. The work already accomplished in implementing various automation schemes, and the type of equipment which can be found for instant automation are described. The plan is general, so that small shops or large production units can perhaps benefit. Examples of major types of automated processing machines are shown to illustrate the general concepts of automated wafer processing.
Barbagallo, Simone; Corradi, Luca; de Ville de Goyet, Jean; Iannucci, Marina; Porro, Ivan; Rosso, Nicola; Tanfani, Elena; Testi, Angela
2015-05-17
The Operating Room (OR) is a key resource of all major hospitals, but it also accounts for up 40% of resource costs. Improving cost effectiveness, while maintaining a quality of care, is a universal objective. These goals imply an optimization of planning and a scheduling of the activities involved. This is highly challenging due to the inherent variable and unpredictable nature of surgery. A Business Process Modeling Notation (BPMN 2.0) was used for the representation of the "OR Process" (being defined as the sequence of all of the elementary steps between "patient ready for surgery" to "patient operated upon") as a general pathway ("path"). The path was then both further standardized as much as possible and, at the same time, keeping all of the key-elements that would allow one to address or define the other steps of planning, and the inherent and wide variability in terms of patient specificity. The path was used to schedule OR activity, room-by-room, and day-by-day, feeding the process from a "waiting list database" and using a mathematical optimization model with the objective of ending up in an optimized planning. The OR process was defined with special attention paid to flows, timing and resource involvement. Standardization involved a dynamics operation and defined an expected operating time for each operation. The optimization model has been implemented and tested on real clinical data. The comparison of the results reported with the real data, shows that by using the optimization model, allows for the scheduling of about 30% more patients than in actual practice, as well as to better exploit the OR efficiency, increasing the average operating room utilization rate up to 20%. The optimization of OR activity planning is essential in order to manage the hospital's waiting list. Optimal planning is facilitated by defining the operation as a standard pathway where all variables are taken into account. By allowing a precise scheduling, it feeds the process of planning and, further up-stream, the management of a waiting list in an interactive and bi-directional dynamic process.
Control of Technology Transfer at JPL
NASA Technical Reports Server (NTRS)
Oliver, Ronald
2006-01-01
Controlled Technology: 1) Design: preliminary or critical design data, schematics, technical flow charts, SNV code/diagnostics, logic flow diagrams, wirelist, ICDs, detailed specifications or requirements. 2) Development: constraints, computations, configurations, technical analyses, acceptance criteria, anomaly resolution, detailed test plans, detailed technical proposals. 3) Production: process or how-to: assemble, operated, repair, maintain, modify. 4) Manufacturing: technical instructions, specific parts, specific materials, specific qualities, specific processes, specific flow. 5) Operations: how-to operate, contingency or standard operating plans, Ops handbooks. 6) Repair: repair instructions, troubleshooting schemes, detailed schematics. 7) Test: specific procedures, data, analysis, detailed test plan and retest plans, detailed anomaly resolutions, detailed failure causes and corrective actions, troubleshooting, trended test data, flight readiness data. 8) Maintenance: maintenance schedules and plans, methods for regular upkeep, overhaul instructions. 9) Modification: modification instructions, upgrades kit parts, including software
LANDSAT-D ground segment operations plan, revision A
NASA Technical Reports Server (NTRS)
Evans, B.
1982-01-01
The basic concept for the utilization of LANDSAT ground processing resources is described. Only the steady state activities that support normal ground processing are addressed. This ground segment operations plan covers all processing of the multispectral scanner and the processing of thematic mapper through data acquisition and payload correction data generation for the LANDSAT 4 mission. The capabilities embedded in the hardware and software elements are presented from an operations viewpoint. The personnel assignments associated with each functional process and the mechanisms available for controlling the overall data flow are identified.
Operator-assisted planning and execution of proximity operations subject to operational constraints
NASA Technical Reports Server (NTRS)
Grunwald, Arthur J.; Ellis, Stephen R.
1991-01-01
Future multi-vehicle operations will involve multiple scenarios that will require a planning tool for the rapid, interactive creation of fuel-efficient trajectories. The planning process must deal with higher-order, non-linear processes involving dynamics that are often counter-intuitive. The optimization of resulting trajectories can be difficult to envision. An interaction proximity operations planning system is being developed to provide the operator with easily interpreted visual feedback of trajectories and constraints. This system is hosted on an IRIS 4D graphics platform and utilizes the Clohessy-Wiltshire equations. An inverse dynamics algorithm is used to remove non-linearities while the trajectory maneuvers are decoupled and separated in a geometric spreadsheet. The operator has direct control of the position and time of trajectory waypoints to achieve the desired end conditions. Graphics provide the operator with visualization of satisfying operational constraints such as structural clearance, plume impingement, approach velocity limits, and arrival or departure corridors. Primer vector theory is combined with graphical presentation to improve operator understanding of suggested automated system solutions and to allow the operator to review, edit, or provide corrective action to the trajectory plan.
Astrophysics science operations - Near-term plans and vision
NASA Technical Reports Server (NTRS)
Riegler, Guenter R.
1991-01-01
Astrophysics science operations planned by the Science Operations branch of NASA Astrophysics Division for the 1990s for the purpose of gathering spaceborne astronomical data are described. The paper describes the near-future plans of the Science Operations in the areas of the preparation of the proposal; the planning and execution of spaceborne observations; the collection, processing, and analysis data; and the dissemination of results. Also presented are concepts planned for introduction at the beginning of the 20th century, including the concepts of open communications, transparent instrument and observatory operations, a spiral requirements development method, and an automated research assistant.
Planning Systems for Distributed Operations
NASA Technical Reports Server (NTRS)
Maxwell, Theresa G.
2002-01-01
This viewgraph representation presents an overview of the mission planning process involving distributed operations (such as the International Space Station (ISS)) and the computer hardware and software systems needed to support such an effort. Topics considered include: evolution of distributed planning systems, ISS distributed planning, the Payload Planning System (PPS), future developments in distributed planning systems, Request Oriented Scheduling Engine (ROSE) and Next Generation distributed planning systems.
DOT National Transportation Integrated Search
2010-02-01
This guidebook presents an approach for integrating management and operations (M&O) strategies into the metropolitan transportation planning process that is designed to maximize the performance of the existing and planned transportation system. This ...
A negotiation methodology and its application to cogeneration planning
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wang, S.M.; Liu, C.C.; Luu, S.
Power system planning has become a complex process in utilities today. This paper presents a methodology for integrated planning with multiple objectives. The methodology uses a graphical representation (Goal-Decision Network) to capture the planning knowledge. The planning process is viewed as a negotiation process that applies three negotiation operators to search for beneficial decisions in a GDN. Also, the negotiation framework is applied to the problem of planning for cogeneration interconnection. The simulation results are presented to illustrate the cogeneration planning process.
A scientific operations plan for the large space telescope. [ground support system design
NASA Technical Reports Server (NTRS)
West, D. K.
1977-01-01
The paper describes an LST ground system which is compatible with the operational requirements of the LST. The goal of the approach is to minimize the cost of post launch operations without seriously compromising the quality and total throughput of LST science. Attention is given to cost constraints and guidelines, the telemetry operations processing systems (TELOPS), the image processing facility, ground system planning and data flow, and scientific interfaces.
Constellation Mission Operation Working Group: ESMO Maneuver Planning Process Review
NASA Technical Reports Server (NTRS)
Moyer, Eric
2015-01-01
The Earth Science Mission Operation (ESMO) Project created an Independent Review Board to review our Conjunction Risk evaluation process and Maneuver Planning Process to identify improvements that safely manages mission conjunction risks, maintains ground track science requirements, and minimizes overall hours expended on High Interest Events (HIE). The Review Board is evaluating the current maneuver process which requires support by multiple groups. In the past year, there have been several changes to the processes although many prior and new concerns exist. This presentation will discuss maneuver process reviews and Board comments, ESMO assessment and path foward, ESMO future plans, recent changes and concerns.
A distributed planning concept for Space Station payload operations
NASA Technical Reports Server (NTRS)
Hagopian, Jeff; Maxwell, Theresa; Reed, Tracey
1994-01-01
The complex and diverse nature of the payload operations to be performed on the Space Station requires a robust and flexible planning approach. The planning approach for Space Station payload operations must support the phased development of the Space Station, as well as the geographically distributed users of the Space Station. To date, the planning approach for manned operations in space has been one of centralized planning to the n-th degree of detail. This approach, while valid for short duration flights, incurs high operations costs and is not conducive to long duration Space Station operations. The Space Station payload operations planning concept must reduce operations costs, accommodate phased station development, support distributed users, and provide flexibility. One way to meet these objectives is to distribute the planning functions across a hierarchy of payload planning organizations based on their particular needs and expertise. This paper presents a planning concept which satisfies all phases of the development of the Space Station (manned Shuttle flights, unmanned Station operations, and permanent manned operations), and the migration from centralized to distributed planning functions. Identified in this paper are the payload planning functions which can be distributed and the process by which these functions are performed.
Systemic Operational Design: An Alternative to Estimate Planning
2009-05-04
relationships found in the COE. Framing and campaign design, with emphasis on systems theory , have therefore made their way to the forefront of doctrinal...short explanation of the systems theory behind SOD, examines how the SOD process happens, and compares SOD with the time proven “Commander’s Estimate... Theory , Campaign planning, Contemporary Operating Environment, Commander’s Estimate Process, Operational design 16. SECURITY CLASSIFICATION OF
Process test plan, phase II: waste retrieval sluicing system emissions collection
DOE Office of Scientific and Technical Information (OSTI.GOV)
POWERS, R.L.
1999-06-01
This Process Test Plan is prepared to continue from HNF-3733 which was Phase I of the test. Supplemental operational controls and sampling requirements are defined to safely obtain gas samples from the 296-C-006 ventilation system stack during active operation of the sluicing equipment.
International Space Station Increment Operations Services
NASA Astrophysics Data System (ADS)
Michaelis, Horst; Sielaff, Christian
2002-01-01
The Industrial Operator (IO) has defined End-to-End services to perform efficiently all required operations tasks for the Manned Space Program (MSP) as agreed during the Ministerial Council in Edinburgh in November 2001. Those services are the result of a detailed task analysis based on the operations processes as derived from the Space Station Program Implementation Plans (SPIP) and defined in the Operations Processes Documents (OPD). These services are related to ISS Increment Operations and ATV Mission Operations. Each of these End-to-End services is typically characterised by the following properties: It has a clearly defined starting point, where all requirements on the end-product are fixed and associated performance metrics of the customer are well defined. It has a clearly defined ending point, when the product or service is delivered to the customer and accepted by him, according to the performance metrics defined at the start point. The implementation of the process might be restricted by external boundary conditions and constraints mutually agreed with the customer. As far as those are respected the IO has the free choice to select methods and means of implementation. The ISS Increment Operations Service (IOS) activities required for the MSP Exploitation program cover the complete increment specific cycle starting with the support to strategic planning and ending with the post increment evaluation. These activities are divided into sub-services including the following tasks: - ISS Planning Support covering the support to strategic and tactical planning up to the generation - Development &Payload Integration Support - ISS Increment Preparation - ISS Increment Execution These processes are tight together by the Increment Integration Management, which provides the planning and scheduling of all activities as well as the technical management of the overall process . The paper describes the entire End-to-End ISS Increment Operations service and the implementation to support the Columbus Flight 1E related increment and subsequent ISS increments. Special attention is paid to the implications caused by long term operations on hardware, software and operations personnel.
NASA Astrophysics Data System (ADS)
Lopez, Bernhard; Whyborn, Nicholas D.; Guniat, Serge; Hernandez, Octavio; Gairing, Stefan
2016-07-01
The Atacama Large Millimeter/submillimeter Array (ALMA) is a joint project between astronomical organizations in Europe, North America, and East Asia, in collaboration with the Republic of Chile. ALMA consists of 54 twelve-meter antennas and 12 seven-meter antennas operating as an aperture synthesis array in the (sub)millimeter wavelength range. Since the inauguration of the observatory back in March 2013 there has been a continuous effort to establish solid operations processes for effective and efficient management of technical and administrative tasks on site. Here a key aspect had been the centralized maintenance and operations planning: input is collected from science stakeholders, the computerized maintenance management system (CMMS) and from the technical teams spread around the world, then this information is analyzed and consolidated based on the established maintenance strategy, the observatory long-term plan and the short-term priorities definitions. This paper presents the high-level process that has been developed for the planning and scheduling of planned- and unplanned maintenance tasks, and for site operations like the telescope array reconfiguration campaigns. We focus on the centralized planning approach by presenting its genesis, its current implementation for the observatory operations including related planning products, and we explore the necessary next steps in order to fully achieve a comprehensive centralized planning approach for ALMA in steady-state operations.
Operative planning of functional sessions for multisatellite observation and communication systems
NASA Astrophysics Data System (ADS)
Darnopykh, Valeriy V.; Malyshev, Veniamin V.
2012-04-01
An important control aspect of modern satellite observation and communication systems is the control of the functional processes. Functional sessions proceed under conditions of restricted technical ability, large amounts or information to be processed by the on-board equipment, practice inequality of the received information, intentions of system management and operators, interests of customers and other factors. A large number of spacecrafts (SC) in orbital constellation is one of the most important factors affecting the functional process also. Besides that some modern projects of satellite systems are multifunctional that is mixed operations of observation and communication. Therefore the functioning of SC on-board equipment must be accurately co-ordinate. That is why the problem of operative planning the functioning of these systems, while directly affecting the efficiency of the system, is very complex and actual at present. A methodical approach and software package for operative planning of functional processes for satellite observation and communication systems, including multifunctional projects, are considered in the paper. The base scheme of this approach consists of four main stages: stage 1—modeling of SC orbital kinematics and dynamics; stage 2—modeling of system functional processes with all kind of restrictions and criterion function values; stage 3—solving an optimization tasks by numerical applicable algorithms and constructing the optimal (or accuracy) plans; stage 4—repeated plan optimization (different variants) and analyzing. Such scheme is the result of authors practical research which have been realized during last 15 years by the operative planning as for any kinds of single SC as for satellite systems with different structure of orbital constellation. The research helps to unify the procedure of operative planning, to formulate basic principles and approaches for its solving, to develop special software package. The main aspects of the approach proposed are illustrated in the paper. The results of the calculations of applied planning problems are presented. The objects of research in these problems are: projects of CBERS observation systems (1-3 SC) and projects of Iridium (66 SC) global communication system.
NASA Technical Reports Server (NTRS)
Decker, Deron R.
1991-01-01
Part of the role of the Mission Operations Lab is the development of budget inputs for Huntsville Operations/Payload Crew Training Center/Payload Operations Control Center (HOSC/PCTC/POCC) activity. These budget inputs are part of the formal Program Operating Plan (POP) process, which occurs twice yearly, and of the formal creation of the yearly operating plan. Both POPs and the operation plan serve the purpose of mapping out planned expenditures for the next fiscal year and for a number of outlying years. Based on these plans, the various Project Offices at the Center fund the HOSC/PCTC/POCC activity. Because of Mission Operations Lab's role in budget development, some of the Project Offices have begun looking to Mission Operations, and specifically the EO02 branch, to track expenditures and explain/justify any deviations from plans. EO02 has encountered difficulties acquiring the necessary information to perform this function. It appears that the necessary linkages with other units had not been fully developed and integrated with the flow of information in budget implementation. The purpose of this study is to document the budget process from the point of view of EO02 and to identify the steps necessary for it to effectively perform this role on a continuous basis.
2014-05-01
There are several types of planning processes and plans, including strategic, operational, tactical, and contingency. For this document, operational planning includes tactical planning. This chapter examines the strategic planning process and includes an introduction into disaster response plans. "A strategic plan is an outline of steps designed with the goals of the entire organisation as a whole in mind, rather than with the goals of specific divisions or departments". Strategic planning includes all measures taken to provide a broad picture of what must be achieved and in which order, including how to organise a system capable of achieving the overall goals. Strategic planning often is done pre-event, based on previous experience and expertise. The strategic planning for disasters converts needs into a strategic plan of action. Strategic plans detail the goals that must be achieved. The process of converting needs into plans has been deconstructed into its components and includes consideration of: (1) disaster response plans; (2) interventions underway or planned; (3) available resources; (4) current status vs. pre-event status; (5) history and experience of the planners; and (6) access to the affected population. These factors are tempered by the local: (a) geography; (b) climate; (c) culture; (d) safety; and (e) practicality. The planning process consumes resources (costs). All plans must be adapted to the actual conditions--things never happen exactly as planned.
76 FR 22648 - Resolution Plans and Credit Exposure Reports Required
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-22
..., including associated services, functions and support that, in the view of the Covered Company or as jointly...-based Covered Company's overall contingency planning process, and information regarding the.... operations be linked to the contingency planning process of the foreign-based Covered Company? Process 1. Are...
2013-07-18
Department of the Navy ERP Enterprise Resource Planning FMO Office of Financial Operations NAVAIR Naval Air Systems Command NAVSEA Naval...supported by business processes in the Navy Enterprise Resource Planning ( ERP ) system for the Aircraft, Shipbuilding, and Weapons Procurement...appropriations. What We Found Department of the Navy Office of Financial Operations officials did not use the Navy ERP system to support $416 billion in
Shuttle operations era planning for flight operations
NASA Technical Reports Server (NTRS)
Holt, J. D.; Beckman, D. A.
1984-01-01
The Space Transportation System (STS) provides routine access to space for a wide range of customers in which cargos vary from single payloads on dedicated flights to multiple payloads that share Shuttle resources. This paper describes the flight operations planning process from payload introduction through flight assignment to execution of the payload objectives and the changes that have been introduced to improve that process. Particular attention is given to the factors that influence the amount of preflight preparation necessary to satisfy customer requirements. The partnership between the STS operations team and the customer is described in terms of their functions and responsibilities in the development of a flight plan. A description of the Mission Control Center (MCC) and payload support capabilities completes the overview of Shuttle flight operations.
40 CFR 62.14470 - When must I comply with this subpart if I plan to continue operation of my HMIWI?
Code of Federal Regulations, 2010 CFR
2010-07-01
... FOR DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Hospital/Medical/Infectious... air pollution control equipment or process changes such that the HMIWI is brought on line, and ensuring that all necessary process changes and air pollution control equipment are operating properly. (3...
40 CFR 62.14470 - When must I comply with this subpart if I plan to continue operation of my HMIWI?
Code of Federal Regulations, 2011 CFR
2011-07-01
... FOR DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Hospital/Medical/Infectious... air pollution control equipment or process changes such that the HMIWI is brought on line, and ensuring that all necessary process changes and air pollution control equipment are operating properly. (3...
23 CFR 450.208 - Coordination of planning process activities.
Code of Federal Regulations, 2013 CFR
2013-04-01
... RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and Programming § 450.208... transportation operators to support statewide transportation planning and programming priorities and decisions...
23 CFR 450.208 - Coordination of planning process activities.
Code of Federal Regulations, 2014 CFR
2014-04-01
... RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and Programming § 450.208... transportation operators to support statewide transportation planning and programming priorities and decisions...
23 CFR 450.208 - Coordination of planning process activities.
Code of Federal Regulations, 2012 CFR
2012-04-01
... RESEARCH PLANNING ASSISTANCE AND STANDARDS Statewide Transportation Planning and Programming § 450.208... transportation operators to support statewide transportation planning and programming priorities and decisions...
Mission Operations of the Mars Exploration Rovers
NASA Technical Reports Server (NTRS)
Bass, Deborah; Lauback, Sharon; Mishkin, Andrew; Limonadi, Daniel
2007-01-01
A document describes a system of processes involved in planning, commanding, and monitoring operations of the rovers Spirit and Opportunity of the Mars Exploration Rover mission. The system is designed to minimize command turnaround time, given that inherent uncertainties in terrain conditions and in successful completion of planned landed spacecraft motions preclude planning of some spacecraft activities until the results of prior activities are known by the ground-based operations team. The processes are partitioned into those (designated as tactical) that must be tied to the Martian clock and those (designated strategic) that can, without loss, be completed in a more leisurely fashion. The tactical processes include assessment of downlinked data, refinement and validation of activity plans, sequencing of commands, and integration and validation of sequences. Strategic processes include communications planning and generation of long-term activity plans. The primary benefit of this partition is to enable the tactical portion of the team to focus solely on tasks that contribute directly to meeting the deadlines for commanding the rover s each sol (1 sol = 1 Martian day) - achieving a turnaround time of 18 hours or less, while facilitating strategic team interactions with other organizations that do not work on a Mars time schedule.
The flight planning - flight management connection
NASA Technical Reports Server (NTRS)
Sorensen, J. A.
1984-01-01
Airborne flight management systems are currently being implemented to minimize direct operating costs when flying over a fixed route between a given city pair. Inherent in the design of these systems is that the horizontal flight path and wind and temperature models be defined and input into the airborne computer before flight. The wind/temperature model and horizontal path are products of the flight planning process. Flight planning consists of generating 3-D reference trajectories through a forecast wind field subject to certain ATC and transport operator constraints. The interrelationships between flight management and flight planning are reviewed, and the steps taken during the flight planning process are summarized.
Space Station Freedom operations planning
NASA Technical Reports Server (NTRS)
Accola, Anne L.; Keith, Bryant
1989-01-01
The Space Station Freedom program is developing an operations planning structure which assigns responsibility for planning activities to three tiers of management. The strategic level develops the policy, goals and requirements for the program over a five-year horizon. Planning at the tactical level emphasizes program integration and planning for a two-year horizon. The tactical planning process, architecture, and products have been documented and discussed with the international partners. Tactical planning includes the assignment of user and system hardware as well as significant operational events to a time increment (the period of time from the arrival of one Shuttle to the manned base to the arrival of the next). Execution-level planning emphasizes implementation, and each organization produces detailed plans, by increment, that are specific to its function.
IUS/TUG orbital operations and mission support study. Volume 4: Project planning data
NASA Technical Reports Server (NTRS)
1975-01-01
Planning data are presented for the development phases of interim upper stage (IUS) and tug systems. Major project planning requirements, major event schedules, milestones, system development and operations process networks, and relevant support research and technology requirements are included. Topics discussed include: IUS flight software; tug flight software; IUS/tug ground control center facilities, personnel, data systems, software, and equipment; IUS mission events; tug mission events; tug/spacecraft rendezvous and docking; tug/orbiter operations interface, and IUS/orbiter operations interface.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barr, Jonathan L.; Tuffner, Francis K.; Hadley, Mark D.
This document contains the Integrated Assessment Plan (IAP) for the Phase 2 Operational Demonstration (OD) of the Smart Power Infrastructure Demonstration for Energy Reliability (SPIDERS) Joint Capability Technology Demonstration (JCTD) project. SPIDERS will be conducted over a three year period with Phase 2 being conducted at Fort Carson, Colorado. This document includes the Operational Demonstration Execution Plan (ODEP) and the Operational Assessment Execution Plan (OAEP), as approved by the Operational Manager (OM) and the Integrated Management Team (IMT). The ODEP describes the process by which the OD is conducted and the OAEP describes the process by which the data collectedmore » from the OD is processed. The execution of the OD, in accordance with the ODEP and the subsequent execution of the OAEP, will generate the necessary data for the Quick Look Report (QLR) and the Utility Assessment Report (UAR). These reports will assess the ability of the SPIDERS JCTD to meet the four critical requirements listed in the Implementation Directive (ID).« less
A Revenue Planning Tool for Charter School Operators
ERIC Educational Resources Information Center
Keller, Eric; Hayes, Cheryl D.
2009-01-01
This revenue planning tool aims to help charter school operators develop a sound revenue base that can meet their school's current and future funding needs. It helps identify and assess potential public (federal, state, and local) and private funding sources. The tool incorporates a four-step revenue planning process which includes: (1)…
Recent progress in utilization planning for Space Station Freedom
NASA Technical Reports Server (NTRS)
Bartoe, John-David F.; Thiringer, Peter S.
1991-01-01
The progress made in utilization planning for the redesigned Space Station Freedom (SSF) concept is described. Consideration is given to the SSF user capabilities, the strategic planning process, the strategic planning organizations, and the Consolidated Operations and Utilization Plan (COUP, which will be released in January 1993) as well as to the COUP development process and implementation. The process by which the COUP will be produced was exercised in the international Multilateral Strategic and Tactical Integration Process (MUSTIP) simulation. The paper describes the MUSTIP simulation and its activities along with MUSTIP findings and recommendations.
A Model for Long Range Planning for Seminole Community College.
ERIC Educational Resources Information Center
Miner, Norris
A model for long-range planning designed to maximize involvement of college personnel, to improve communication among various areas of the college, to provide a process for evaluation of long-range plans and the planning process, to adjust to changing conditions, to utilize data developed at a level useful for actual operations, and to have…
The Mission Operations Planning Assistant
NASA Technical Reports Server (NTRS)
Schuetzle, James G.
1987-01-01
The Mission Operations Planning Assistant (MOPA) is a knowledge-based system developed to support the planning and scheduling of instrument activities on the Upper Atmospheric Research Satellite (UARS). The MOPA system represents and maintains instrument plans at two levels of abstraction in order to keep plans comprehensible to both UARS Principal Investigators and Command Management personnel. The hierarchical representation of plans also allows MOPA to automatically create detailed instrument activity plans from which spacecraft command loads may be generated. The MOPA system was developed on a Symbolics 3640 computer using the ZetaLisp and ART languages. MOPA's features include a textual and graphical interface for plan inspection and modification, recognition of instrument operational constraint violations during the planning process, and consistency maintenance between the different planning levels. This paper describes the current MOPA system.
The mission operations planning assistant
NASA Technical Reports Server (NTRS)
Schuetzle, James G.
1987-01-01
The Mission Operations Planning Assistant (MOPA) is a knowledge-based system developed to support the planning and scheduling of instrument activities on the Upper Atmospheric Research Satellite (UARS). The MOPA system represents and maintains instrument plans at two levels of abstraction in order to keep plans comprehensible to both UARS Prinicpal Investigators and Command Management personnel. The hierarchical representation of plans also allows MOPA to automatically create detailed instrument activity plans from which spacecraft command loads may be generated. The MOPA system was developed on a Symbolics 3640 computer using the ZETALISP and ART languages. MOPA's features include a textual and graphical interface for plan inspection and modification, recognition of instrument operational constraint violations during the planning process, and consistency maintenance between the different planning levels. This paper describes the current MOPA system.
Strategic planning for hotel operations: The Ritz-Carlton Hotel Company (Part I).
Shriver, S J
1993-01-01
The Ritz-Carlton Hotel Company won the Malcolm Baldridge National Quality Award in 1992. One key to its success is its strategic planning process. This two-part article reviews the Ritz-Carlton's approach to strategic planning. In particular, it describes (1) the role of senior leadership in the planning process and (2) the specific activities that are associated with plan development and implementation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clifford, M.J.; Wickstrom, G.V.
1983-10-01
Preferred treatment of high occupancy vehicles (HOV's), through strategies such as dedicated lanes, can achieve transportation energy conservation. The research presented in this report provides a method for regional planning agencies to assess such HOV facilities, from a travel demand and energy consumption standpoint. The planning process is described and applied in a case study. Products of the case study included estimates of carpool formation and associated fuel savings, and traffic operations on HOV and other facilities in the corridor. The completed process represents a method to examine HOV's under a variety of policy and operational conditions. The process ismore » within the modeling capabilities of other Metropolitan Planning Organizations (MPO's) and should be transferable to other cities and corridors. Additional applications of the HOV estimation and evaluation process are recommended.« less
2017-05-25
the planning process. Current US Army doctrine links conceptual planning to the Army Design Methodology and detailed planning to the Military...Decision Making Process. By associating conceptual and detailed planning with doctrinal methodologies , it is easy to regard the transition as a set period...plans into detailed directives resulting in changes to the operational environment. 15. SUBJECT TERMS Design; Army Design Methodology ; Conceptual
Succession planning: a call to action for nurse executives.
Trepanier, Sylvain; Crenshaw, Jeannette T
2013-10-01
To discuss the organisational benefits of strategic succession planning in acute care hospital settings as a responsibility of chief nurse executives. A formal succession planning process is crucial to the financial and operational viability and sustainability of acute care hospitals. A succession plan is an essential business strategy that promotes effective leadership transition and continuity while maintaining productivity. Nursing and business literature were reviewed; reports contrasting institutions with and without succession plans were examined; and, operational implications were considered. It is imperative that chief nurse executives respond to the business benefits of an effective succession planning programme, identify common barriers and solutions, and implement best practices for a successful strategic succession planning programme. A strategic succession planning programme may offer many benefits to an acute care hospital, including improved retention rates, increased staff engagement and enhanced financial performance. Considering the ageing nursing workforce and the potential increase in demand for nursing services in the near future, nurse executives and other nurse leaders must actively engage in a formal succession planning process. A formal succession planning programme will help to provide strategic leadership continuity, operational effectiveness and improved quality of care. © 2013 John Wiley & Sons Ltd.
Defense Depot Tracy Total Quality Management Plan
1989-07-01
PAGES TQM (Total Quality Management ), Depot Operations, Continuous Process Improvement 16. PRICE CODE 17. SECURITY CLASSIFICATION 18. SECURITY...make up our pcrceptions of Total Quality Management . Our goal is to improve those proven management processes that have brought us success while being...MANIAGEMENT F. QUALITY AUDITS OF PRODUCTS AND OPERATIONS ASSETS MANAGEMENT 00 i .......... / ~899 29 03 1 EFENSE DEPOT TACY TOTAL QUALITY MANAGEMENT PLAN
[Implementation of a rational standard of hygiene for preparation of operating rooms].
Bauer, M; Scheithauer, S; Moerer, O; Pütz, H; Sliwa, B; Schmidt, C E; Russo, S G; Waeschle, R M
2015-10-01
The assurance of high standards of care is a major requirement in German hospitals while cost reduction and efficient use of resources are mandatory. These requirements are particularly evident in the high-risk and cost-intensive operating theatre field with multiple process steps. The cleaning of operating rooms (OR) between surgical procedures is of major relevance for patient safety and requires time and human resources. The hygiene procedure plan for OR cleaning between operations at the university hospital in Göttingen was revised and optimized according to the plan-do-check-act principle due to not clearly defined specifications of responsibilities, use of resources, prolonged process times and increased staff engagement. The current status was evaluated in 2012 as part of the first step "plan". The subsequent step "do" included an expert symposium with external consultants, interdisciplinary consensus conferences with an actualization of the former hygiene procedure plan and the implementation process. All staff members involved were integrated into this management change process. The penetration rate of the training and information measures as well as the acceptance and compliance with the new hygiene procedure plan were reviewed within step "check". The rates of positive swabs and air sampling as well as of postoperative wound infections were analyzed for quality control and no evidence for a reduced effectiveness of the new hygiene plan was found. After the successful implementation of these measures the next improvement cycle ("act") was performed in 2014 which led to a simplification of the hygiene plan by reduction of the number of defined cleaning and disinfection programs for preparation of the OR. The reorganization measures described led to a comprehensive commitment of the hygiene procedure plan by distinct specifications for responsibilities, for the course of action and for the use of resources. Furthermore, a simplification of the plan, a rational staff assignment and reduced process times were accomplished. Finally, potential conflicts due to an insufficient evidence-based knowledge of personnel was reduced. This present project description can be used by other hospitals as a guideline for similar changes in management processes.
Plant operation planning and scheduling
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jammar, R.J.
When properly designed, planning and scheduling can actually add millions of dollars per year to the bottom line. Planning and scheduling is a continuum of decisions starting with crude selection and ending with establishing short-term targets for crude processing and blending. It also includes maintaining optimization and operation simulation models. It is thought that conservatively, a refinery may save from $5 million to $10 million a year if it pays more attention to the processes behind proper planning and scheduling. Of course, the amount of savings can reach staggering proportions for companies now at the bottom of the Solomon Associatesmore » Inc. refinery performance ranking.« less
[Bone drilling simulation by three-dimensional imaging].
Suto, Y; Furuhata, K; Kojima, T; Kurokawa, T; Kobayashi, M
1989-06-01
The three-dimensional display technique has a wide range of medical applications. Pre-operative planning is one typical application: in orthopedic surgery, three-dimensional image processing has been used very successfully. We have employed this technique in pre-operative planning for orthopedic surgery, and have developed a simulation system for bone-drilling. Positive results were obtained by pre-operative rehearsal; when a region of interest is indicated by means of a mouse on the three-dimensional image displayed on the CRT, the corresponding region appears on the slice image which is displayed simultaneously. Consequently, the status of the bone-drilling is constantly monitored. In developing this system, we have placed emphasis on the quality of the reconstructed three-dimensional images, on fast processing, and on the easy operation of the surgical planning simulation.
Comprehensive integrated planning: A process for the Oak Ridge Reservation, Oak Ridge, Tennessee
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-05-01
The Oak Ridge Comprehensive Integrated Plan is intended to assist the US Department of Energy (DOE) and contractor personnel in implementing a comprehensive integrated planning process consistent with DOE Order 430.1, Life Cycle Asset Management and Oak Ridge Operations Order 430. DOE contractors are charged with developing and producing the Comprehensive Integrated Plan, which serves as a summary document, providing information from other planning efforts regarding vision statements, missions, contextual conditions, resources and facilities, decision processes, and stakeholder involvement. The Comprehensive Integrated Plan is a planning reference that identifies primary issues regarding major changes in land and facility use andmore » serves all programs and functions on-site as well as the Oak Ridge Operations Office and DOE Headquarters. The Oak Ridge Reservation is a valuable national resource and is managed on the basis of the principles of ecosystem management and sustainable development and how mission, economic, ecological, social, and cultural factors are used to guide land- and facility-use decisions. The long-term goals of the comprehensive integrated planning process, in priority order, are to support DOE critical missions and to stimulate the economy while maintaining a quality environment.« less
CNES Strategic Plan for Space Traffic Control
NASA Astrophysics Data System (ADS)
Alby, Fernand
2013-09-01
The increasing orbital debris population represents a growing risk to operational satellites on-orbit and also to populations and properties on-ground. Today available space surveillance data allow a better implementation of protection activities which are now part of operational services. The overall frame of these activities at CNES is given by a strategic plan defining the long term views and the corresponding activities to be carried out during the next years. This plan, established in close cooperation with French Defence organizations, includes, among others, two operational space traffic control activities: prevention of on-orbit collisions and atmospheric re-entries predictions.This paper presents first the national organization relative to these activities together with the internal CNES process starting from a high level roadmap, up to a detailed action plan. This plan contains operational activities and supporting studies and models development.The content of this plan is given with a focus on operational activities dealing with space traffic control.
Opals: Mission System Operations Architecture for an Optical Communications Demonstration on the ISS
NASA Technical Reports Server (NTRS)
Abrahamson, Matthew J.; Sindiy, Oleg V.; Oaida, Bogdan V.; Fregoso, Santos; Bowles-Martinez, Jessica N.; Kokorowski, Michael; Wilkerson, Marcus W.; Konyha, Alexander L.
2014-01-01
In April of 2014, the Optical PAyload for Lasercomm Science (OPALS) Flight System (FS) launched to the International Space Station (ISS) to demonstrate space-to-ground optical communications. During a planned 90-day baseline mission, the OPALS FS will downlink high quality, short duration videos to the Optical Communications Telescope Laboratory (OCTL) ground station in Wrightwood, California. Interfaces to the ISS payload operations infrastructure have been established to facilitate activity planning, hazardous laser operations, commanding, and telemetry transmission. In addition, internal processes, such as pointing prediction and data processing, satisfy the technical requirements of the mission. The OPALS operations team participates in Operational Readiness Tests (ORTs) with external partners to exercise coordination processes and train for the overall mission. The ORTs have provided valuable insight into operational considerations for the instrument on the ISS.
1988-04-11
Monograph Director I. Lieutenant Colonel Charles D. Daves , M.S. l, e ’- i % 4 ’- Director, School of Colonel L.D. Holder, M.A. Advanced Military...operations within the campaign plan. Phase I (1 April-30 June 1945) envisioned American forces seizing airfields and anchorages in the Bonin and...occupied as a result of operations commencing December 1944. Additionally, the planners relied on the seizure of Iwo Jima in the Bonin islands and the
Integrated payload and mission planning, phase 3. Volume 3: Ground real-time mission operations
NASA Technical Reports Server (NTRS)
White, W. J.
1977-01-01
The payloads tentatively planned to fly on the first two Spacelab missions were analyzed to examine the cost relationships of providing mission operations support from onboard vs the ground-based Payload Operations Control Center (POCC). The quantitative results indicate that use of a POCC, with data processing capability, to support real-time mission operations is the most cost effective case.
Web Application Software for Ground Operations Planning Database (GOPDb) Management
NASA Technical Reports Server (NTRS)
Lanham, Clifton; Kallner, Shawn; Gernand, Jeffrey
2013-01-01
A Web application facilitates collaborative development of the ground operations planning document. This will reduce costs and development time for new programs by incorporating the data governance, access control, and revision tracking of the ground operations planning data. Ground Operations Planning requires the creation and maintenance of detailed timelines and documentation. The GOPDb Web application was created using state-of-the-art Web 2.0 technologies, and was deployed as SaaS (Software as a Service), with an emphasis on data governance and security needs. Application access is managed using two-factor authentication, with data write permissions tied to user roles and responsibilities. Multiple instances of the application can be deployed on a Web server to meet the robust needs for multiple, future programs with minimal additional cost. This innovation features high availability and scalability, with no additional software that needs to be bought or installed. For data governance and security (data quality, management, business process management, and risk management for data handling), the software uses NAMS. No local copy/cloning of data is permitted. Data change log/tracking is addressed, as well as collaboration, work flow, and process standardization. The software provides on-line documentation and detailed Web-based help. There are multiple ways that this software can be deployed on a Web server to meet ground operations planning needs for future programs. The software could be used to support commercial crew ground operations planning, as well as commercial payload/satellite ground operations planning. The application source code and database schema are owned by NASA.
ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks
NASA Technical Reports Server (NTRS)
Hall, Timothy A.
2011-01-01
In 2008 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organization to find ways to reduce the costs of International Space station (ISS) console operations in the Mission Control Center (MCC). Each MOD organization was asked to identify projects that would help them attain a goal of a 30% reduction in operating costs by 2012. The MOD Operations and Planning organization responded to this challenge by launching several software automation projects that would allow them to greatly improve ISS console operations and reduce staffing and operating costs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the plan of eliminating two full time ISS console support positions by 2012. This will account for an overall 10 EP reduction in staffing for the Operations and Planning organization. These automation projects focused on utilizing software to automate many administrative and often repetitive tasks involved with processing ISS planning and daily operations information. This information was exchanged between the ground flight control teams in Houston and around the globe, as well as with the ISS astronaut crew. These tasks ranged from managing mission plan changes from around the globe, to uploading and downloading information to and from the ISS crew, to even more complex tasks that required multiple decision points to process the data, track approvals and deliver it to the correct recipient across network and security boundaries. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture between several planning tools; as well as a engaging a previously research level technology (TRL 2-3) developed by Ames Research Center (ARC) that utilized an intelligent agent based system to manage and automate file traffic flow, archiving f data, and generating console logs. This technology called OCAMS (OCA (Orbital Communication System) Management System), is now considered TRL level 9 and is in daily use in the Mission Control Center in support of ISS operations. These solutions have not only allowed for improved efficiency on console; but since many of the previously manual data transfers are now automated, many of the human error prone steps have been removed, and the quality of the planning products has improved tremendously. This has also allowed our Planning Flight Controllers more time to focus on the abstract areas of the job, (like the complexities of planning a mission for 6 international crew members with a global planning team), instead of being burdened with the administrative tasks that took significant time each console shift to process. The resulting automation solutions have allowed the Operations and Planning organization to realize significant cost savings for the ISS program through 2020 and many of these solutions could be a viable
Brandenburg, Marcus; Hahn, Gerd J
2018-06-01
Process industries typically involve complex manufacturing operations and thus require adequate decision support for aggregate production planning (APP). The need for powerful and efficient approaches to solve complex APP problems persists. Problem-specific solution approaches are advantageous compared to standardized approaches that are designed to provide basic decision support for a broad range of planning problems but inadequate to optimize under consideration of specific settings. This in turn calls for methods to compare different approaches regarding their computational performance and solution quality. In this paper, we present a benchmarking problem for APP in the chemical process industry. The presented problem focuses on (i) sustainable operations planning involving multiple alternative production modes/routings with specific production-related carbon emission and the social dimension of varying operating rates and (ii) integrated campaign planning with production mix/volume on the operational level. The mutual trade-offs between economic, environmental and social factors can be considered as externalized factors (production-related carbon emission and overtime working hours) as well as internalized ones (resulting costs). We provide data for all problem parameters in addition to a detailed verbal problem statement. We refer to Hahn and Brandenburg [1] for a first numerical analysis based on and for future research perspectives arising from this benchmarking problem.
23 CFR 450.306 - Scope of the metropolitan transportation planning process.
Code of Federal Regulations, 2014 CFR
2014-04-01
...: (1) Support the economic vitality of the metropolitan area, especially by enabling global...; (7) Promote efficient system management and operation; and (8) Emphasize the preservation of the... transportation operators may apply asset management principles and techniques in establishing planning goals...
23 CFR 450.306 - Scope of the metropolitan transportation planning process.
Code of Federal Regulations, 2012 CFR
2012-04-01
...: (1) Support the economic vitality of the metropolitan area, especially by enabling global...; (7) Promote efficient system management and operation; and (8) Emphasize the preservation of the... transportation operators may apply asset management principles and techniques in establishing planning goals...
23 CFR 450.306 - Scope of the metropolitan transportation planning process.
Code of Federal Regulations, 2013 CFR
2013-04-01
...: (1) Support the economic vitality of the metropolitan area, especially by enabling global...; (7) Promote efficient system management and operation; and (8) Emphasize the preservation of the... transportation operators may apply asset management principles and techniques in establishing planning goals...
Aerobic Digestion. Biological Treatment Process Control. Instructor's Guide.
ERIC Educational Resources Information Center
Klopping, Paul H.
This unit on aerobic sludge digestion covers the theory of the process, system components, factors that affect the process performance, standard operational concerns, indicators of steady-state operations, and operational problems. The instructor's guide includes: (1) an overview of the unit; (2) lesson plan; (3) lecture outline (keyed to a set of…
Actual operation and regulatory activities on steam generator replacement in Japan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Saeki, Hitoshi
1997-02-01
This paper summarizes the operating reactors in Japan, and the status of the steam generators in these plants. It reviews plans for replacement of existing steam generators, and then goes into more detail on the planning and regulatory steps which must be addressed in the process of accomplishing this maintenance. The paper also reviews the typical steps involved in the process of removal and replacement of steam generators.
Commander’s Handbook for Strategic Communication and Communication Strategy
2010-06-24
designed to gather SC educators and key practitioners for thoughtful discussions on SC education and training issues. KLE is not about engaging key...operational design and early joint operation planning process to identify indicators that will enable us to detect when it is time to “reframe” the problem...integrating process across DOD, included in concept and doctrine development, strategy and plan design , execution, and assessment, and incorporated
A Comparative Analysis of the Budget Process in the Venezuelan and U.S. Navies.
1979-12-01
accounting problems in particular agencies. The DINCA developed a document, Sistema de Contabilidad de la Ejecucion Financiera del Presupuesto para...orienta- tion of the "Plan Operativo Anual" (POA) - Operative Annual Plan. During the Navy’s mid-range planning process the POA is produced. By means of
Galileo mission planning for Low Gain Antenna based operations
NASA Technical Reports Server (NTRS)
Gershman, R.; Buxbaum, K. L.; Ludwinski, J. M.; Paczkowski, B. G.
1994-01-01
The Galileo mission operations concept is undergoing substantial redesign, necessitated by the deployment failure of the High Gain Antenna, while the spacecraft is on its way to Jupiter. The new design applies state-of-the-art technology and processes to increase the telemetry rate available through the Low Gain Antenna and to increase the information density of the telemetry. This paper describes the mission planning process being developed as part of this redesign. Principal topics include a brief description of the new mission concept and anticipated science return (these have been covered more extensively in earlier papers), identification of key drivers on the mission planning process, a description of the process and its implementation schedule, a discussion of the application of automated mission planning tool to the process, and a status report on mission planning work to date. Galileo enhancements include extensive reprogramming of on-board computers and substantial hard ware and software upgrades for the Deep Space Network (DSN). The principal mode of operation will be onboard recording of science data followed by extended playback periods. A variety of techniques will be used to compress and edit the data both before recording and during playback. A highly-compressed real-time science data stream will also be important. The telemetry rate will be increased using advanced coding techniques and advanced receivers. Galileo mission planning for orbital operations now involves partitioning of several scarce resources. Particularly difficult are division of the telemetry among the many users (eleven instruments, radio science, engineering monitoring, and navigation) and allocation of space on the tape recorder at each of the ten satellite encounters. The planning process is complicated by uncertainty in forecast performance of the DSN modifications and the non-deterministic nature of the new data compression schemes. Key mission planning steps include quantifying resource or capabilities to be allocated, prioritizing science observations and estimating resource needs for each, working inter-and intra-orbit trades of these resources among the Project elements, and planning real-time science activity. The first major mission planning activity, a high level, orbit-by-orbit allocation of resources among science objectives, has already been completed; and results are illustrated in the paper. To make efficient use of limited resources, Galileo mission planning will rely on automated mission planning tools capable of dealing with interactions among time-varying downlink capability, real-time science and engineering data transmission, and playback of recorded data. A new generic mission planning tool is being adapted for this purpose.
Galileo mission planning for Low Gain Antenna based operations
NASA Astrophysics Data System (ADS)
Gershman, R.; Buxbaum, K. L.; Ludwinski, J. M.; Paczkowski, B. G.
1994-11-01
The Galileo mission operations concept is undergoing substantial redesign, necessitated by the deployment failure of the High Gain Antenna, while the spacecraft is on its way to Jupiter. The new design applies state-of-the-art technology and processes to increase the telemetry rate available through the Low Gain Antenna and to increase the information density of the telemetry. This paper describes the mission planning process being developed as part of this redesign. Principal topics include a brief description of the new mission concept and anticipated science return (these have been covered more extensively in earlier papers), identification of key drivers on the mission planning process, a description of the process and its implementation schedule, a discussion of the application of automated mission planning tool to the process, and a status report on mission planning work to date. Galileo enhancements include extensive reprogramming of on-board computers and substantial hard ware and software upgrades for the Deep Space Network (DSN). The principal mode of operation will be onboard recording of science data followed by extended playback periods. A variety of techniques will be used to compress and edit the data both before recording and during playback. A highly-compressed real-time science data stream will also be important. The telemetry rate will be increased using advanced coding techniques and advanced receivers. Galileo mission planning for orbital operations now involves partitioning of several scarce resources. Particularly difficult are division of the telemetry among the many users (eleven instruments, radio science, engineering monitoring, and navigation) and allocation of space on the tape recorder at each of the ten satellite encounters. The planning process is complicated by uncertainty in forecast performance of the DSN modifications and the non-deterministic nature of the new data compression schemes. Key mission planning steps include quantifying resource or capabilities to be allocated, prioritizing science observations and estimating resource needs for each, working inter-and intra-orbit trades of these resources among the Project elements, and planning real-time science activity. The first major mission planning activity, a high level, orbit-by-orbit allocation of resources among science objectives, has already been completed; and results are illustrated in the paper. To make efficient use of limited resources, Galileo mission planning will rely on automated mission planning tools capable of dealing with interactions among time-varying downlink capability, real-time science and engineering data transmission, and playback of recorded data. A new generic mission planning tool is being adapted for this purpose.
Autonomous Vehicle Mission Planning Using AI (Artificial Intelligence) Techniques.
1985-12-01
it uses are declarative patterns that encode facts about how goals may give rise to - . plans. The program processes a story a sentence at a time...the planning process. By separating the knowledge about how to plan from the specific domain knowledge, an understander can use this knowledge about how ...path planning program developed in a previous thesis effort will be incorporated into the overall program in order to demonstrate the operating system
JWST Operations and the Phase I and II Process
NASA Astrophysics Data System (ADS)
Beck, Tracy L.
2010-07-01
The JWST operations and Phase I and Phase II process will build upon our knowledge on the current system in use for HST. The primary observing overheads associated with JWST observations, both direct and indirect, are summarized. While some key operations constraints for JWST may cause deviations from the HST model for proposal planning, the overall interface to JWST planning will use the APT and will appear similar to the HST interface. The requirement is to have a proposal planning model simlar to HST, where proposals submitted to the TAC must have at least the minimum amount of information necessary for assessment of the strength of the science. However, a goal of the JWST planning process is to have the submitted Phase I proposal in executable form, and as complete as possible for many programs. JWST will have significant constraints on the spacecraft pointing and orient, so it is beneficial for the planning process to have these scheduling constraints on programs defined as early as possible. The guide field of JWST is also much smaller than the HST guide field, so searches for available guide stars for JWST science programs must be done at the Phase I deadline. The long range observing plan for each JWST cycle will be generated intially from the TAC accepted programs at the Phase I deadline, and the LRP will be refined after the Phase II deadline when all scheduling constraints are defined.
ARCHITECTURAL FLOOR PLAN OF OPERATING AREA HOT PILOT PLANT (CPP640). ...
ARCHITECTURAL FLOOR PLAN OF OPERATING AREA HOT PILOT PLANT (CPP-640). INL DRAWING NUMBER 200-0640-00-279-111678. ALTERNATE ID NUMBER 8952-CPP-640-A-1. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
Tracking the Short Term Planning (STP) Development Process
NASA Technical Reports Server (NTRS)
Price, Melanie; Moore, Alexander
2010-01-01
Part of the National Aeronautics and Space Administration?s mission is to pioneer the future in space exploration, scientific discovery and aeronautics research is enhanced by discovering new scientific tools to improve life on earth. Sequentially, to successfully explore the unknown, there has to be a planning process that organizes certain events in the right priority. Therefore, the planning support team has to continually improve their processes so the ISS Mission Operations can operate smoothly and effectively. The planning support team consists of people in the Long Range Planning area that develop timelines that includes International Partner?s Preliminary STP inputs all the way through to publishing of the Final STP. Planning is a crucial part of the NASA community when it comes to planning the astronaut?s daily schedule in great detail. The STP Process is in need of improvement, because of the various tasks that are required to be broken down in order to get the overall objective of developing a Final STP done correctly. Then a new project came along in order to store various data in a more efficient database. "The SharePoint site is a Web site that provides a central storage and collaboration space for documents, information, and ideas."
Applying the Theory of Constraints to a Base Civil Engineering Operations Branch
1991-09-01
Figure Page 1. Typical Work Order Processing . .......... 7 2. Typical Job Order Processing . .......... 8 3. Typical Simplified In-Service Work Plan for...Customers’ Customer Request Service Planning Unit Production] Control Center Material Control Scheduling CE Shops Figure 1.. Typical Work Order Processing 7
An innovative approach to capability-based emergency operations planning
Keim, Mark E
2013-01-01
This paper describes the innovative use information technology for assisting disaster planners with an easily-accessible method for writing and improving evidence-based emergency operations plans. This process is used to identify all key objectives of the emergency response according to capabilities of the institution, community or society. The approach then uses a standardized, objective-based format, along with a consensus-based method for drafting capability-based operational-level plans. This information is then integrated within a relational database to allow for ease of access and enhanced functionality to search, sort and filter and emergency operations plan according to user need and technological capacity. This integrated approach is offered as an effective option for integrating best practices of planning with the efficiency, scalability and flexibility of modern information and communication technology. PMID:28228987
An innovative approach to capability-based emergency operations planning.
Keim, Mark E
2013-01-01
This paper describes the innovative use information technology for assisting disaster planners with an easily-accessible method for writing and improving evidence-based emergency operations plans. This process is used to identify all key objectives of the emergency response according to capabilities of the institution, community or society. The approach then uses a standardized, objective-based format, along with a consensus-based method for drafting capability-based operational-level plans. This information is then integrated within a relational database to allow for ease of access and enhanced functionality to search, sort and filter and emergency operations plan according to user need and technological capacity. This integrated approach is offered as an effective option for integrating best practices of planning with the efficiency, scalability and flexibility of modern information and communication technology.
NASA Technical Reports Server (NTRS)
Doshi, Rajkumar S.; Lam, Raymond; White, James E.
1989-01-01
Intermediate and high level processing operations are performed on vision data for the organization of images into more meaningful, higher-level topological representations by means of a region-based route planner (RBRP). The RBRP operates in terrain scenarios where some or most of the terrain is occluded, proceeding without a priori maps on the basis of two-dimensional representations and gradient-and-roughness information. Route planning is accomplished by three successive abstractions and yields a detailed point-by-point path by searching only within the boundaries of relatively small regions.
Word Processing Curriculum: Attitudes/Skills Business Educators Should Update.
ERIC Educational Resources Information Center
Robertson, Jane R.; West, Judy F.
1984-01-01
Discusses a study to gain data enabling curricula planners and business educators to plan an effective word processing curriculum, to determine basic skills and attitudes needed by word processing operators, and to make recommendations to help word processor operators increase productivity. (JOW)
NASA Technical Reports Server (NTRS)
Chien, S. A.; Hill, R. W., Jr.; Govindjee, A.; Wang, X.; Estlin, T.; Griesel, M. A.; Lam, R.; Fayyad, K. V.
1996-01-01
This paper describes a hierarchical scheduling, planning, control, and execution monitoring architecture for automating operations of a worldwide network of communications antennas. The purpose of this paper is to describe an architecture for automating the process of capturing spacecraft data.
Renewable Energy Zone (REZ) Transmission Planning Process: A Guidebook for Practitioners
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lee, Nathan; Flores-Espino, Francisco; Hurlbut, David J.
Achieving clean energy goals may require new investments in transmission, especially if planners anticipate economic growth and increased demand for electricity. The renewable energy zone (REZ) transmission planning process can help policymakers ensure their infrastructure investments achieve national goals in the most economical manner. Policymakers, planners, and system operators around the world have used variations of the REZ process to chart the expansion of their transmission networks and overcome the barriers of traditional transmission planning. This guidebook seeks to help power system planners, key decision makers, and stakeholders understand and use the REZ transmission planning process to integrate transmission expansionmore » planning and renewable energy generation planning.« less
NASA Astrophysics Data System (ADS)
Nejad, Hossein Tehrani Nik; Sugimura, Nobuhiro; Iwamura, Koji; Tanimizu, Yoshitaka
Process planning and scheduling are important manufacturing planning activities which deal with resource utilization and time span of manufacturing operations. The process plans and the schedules generated in the planning phase shall be modified in the execution phase due to the disturbances in the manufacturing systems. This paper deals with a multi-agent architecture of an integrated and dynamic system for process planning and scheduling for multi jobs. A negotiation protocol is discussed, in this paper, to generate the process plans and the schedules of the manufacturing resources and the individual jobs, dynamically and incrementally, based on the alternative manufacturing processes. The alternative manufacturing processes are presented by the process plan networks discussed in the previous paper, and the suitable process plans and schedules are searched and generated to cope with both the dynamic status and the disturbances of the manufacturing systems. We initiatively combine the heuristic search algorithms of the process plan networks with the negotiation protocols, in order to generate suitable process plans and schedules in the dynamic manufacturing environment. A simulation software has been developed to carry out case studies, aimed at verifying the performance of the proposed multi-agent architecture.
Redesign of occupational health service operations--strategic planning and evaluation.
Tobias, Beverley; Burnes-Line, Bernadette; Pellarin, Margaret
2008-10-01
This article describes the strategic planning process used by a major academic medical center to redesign the employee health service. The steps in the process are discussed and data demonstrating the success of the program redesign are presented.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kulvatunyou, Boonserm; Wysk, Richard A.; Cho, Hyunbo
2004-06-01
In today's global manufacturing environment, manufacturing functions are distributed as never before. Design, engineering, fabrication, and assembly of new products are done routinely in many different enterprises scattered around the world. Successful business transactions require the sharing of design and engineering data on an unprecedented scale. This paper describes a framework that facilitates the collaboration of engineering tasks, particularly process planning and analysis, to support such globalized manufacturing activities. The information models of data and the software components that integrate those information models are described. The integration framework uses an Integrated Product and Process Data (IPPD) representation called a Resourcemore » Independent Operation Summary (RIOS) to facilitate the communication of business and manufacturing requirements. Hierarchical process modeling, process planning decomposition and an augmented AND/OR directed graph are used in this representation. The Resource Specific Process Planning (RSPP) module assigns required equipment and tools, selects process parameters, and determines manufacturing costs based on two-level hierarchical RIOS data. The shop floor knowledge (resource and process knowledge) and a hybrid approach (heuristic and linear programming) to linearize the AND/OR graph provide the basis for the planning. Finally, a prototype system is developed and demonstrated with an exemplary part. Java and XML (Extensible Markup Language) are used to ensure software and information portability.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zank, G.D.
1989-05-01
The relationship between strategic offensive capabilities (reflected in the SIOP) and emerging strategic defensive capabilities (reflected by SDI) is not being adequately addressed. A summary of the existing nuclear war planning process is provided, and an analagous defensive process is postulated. Parallels and differences between the two processes are discussed. Potential areas for information exchange and cooperation are identified to enhance deterrence and improve war fighting potential. Operational, technical and political issues requiring resolution are raised and recommendations to resolve these issues are made.
Where Are We Going? Planning Assumptions for Community Colleges.
ERIC Educational Resources Information Center
Maas, Rao, Taylor and Associates, Riverside, CA.
Designed to provide community college planners with a series of reference assumptions to consider in the planning process, this document sets forth assumptions related to finance (i.e., operational funds, capital funds, alternate funding sources, and campus financial operations); California state priorities; occupational trends; population (i.e.,…
Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bradley, J.
2002-06-18
The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process.
Automating Mission Scheduling for Space-Based Observatories
NASA Technical Reports Server (NTRS)
Pell, Barney; Muscettola, Nicola; Hansson, Othar; Mohan, Sunil
1998-01-01
In this paper we describe the use of our planning and scheduling framework, HSTS, to reduce the complexity of science mission planning. This work is part of an overall project to enable a small team of scientists to control the operations of a spacecraft. The present process is highly labor intensive. Users (scientists and operators) rely on a non-codified understanding of the different spacecraft subsystems and of their operating constraints. They use a variety of software tools to support their decision making process. This paper considers the types of decision making that need to be supported/automated, the nature of the domain constraints and the capabilities needed to address them successfully, and the nature of external software systems with which the core planning/scheduling engine needs to interact. HSTS has been applied to science scheduling for EUVE and Cassini and is being adapted to support autonomous spacecraft operations in the New Millennium initiative.
Give Design a Chance: A Case for a Human Centered Approach to Operational Art
2017-03-30
strategy development and operational art. This demands fuller integration of the Army Design Methodology (ADM) and the Military Decision Making Process...MDMP). This monograph proposes a way of thinking and planning that goes beyond current Army doctrinal methodologies to address the changing...between conceptual and detailed planning. 15. SUBJECT TERMS Design; Army Design Methodology (ADM); Human Centered; Strategy; Operational Art
Automated Sequence Generation Process and Software
NASA Technical Reports Server (NTRS)
Gladden, Roy
2007-01-01
"Automated sequence generation" (autogen) signifies both a process and software used to automatically generate sequences of commands to operate various spacecraft. The autogen software comprises the autogen script plus the Activity Plan Generator (APGEN) program. APGEN can be used for planning missions and command sequences.
The Use of Multi-Criteria Evaluation and Network Analysis in the Area Development Planning Process
2013-03-01
layouts. The alternative layout scoring process, base in multi-criteria evaluation, returns a quantitative score for each alternative layout and a...The purpose of this research was to develop improvements to the area development planning process. These plans are used to improve operations within...an installation sub-section by altering the physical layout of facilities. One methodology was developed based on apply network analysis concepts to
LANDSAT-D Mission Operations Review (MOR)
NASA Technical Reports Server (NTRS)
1982-01-01
Portions of the LANDSAT-D systems operation plan are presented. An overview of the data processing operations, logistics and other operations support, prelaunch and post-launch activities, thematic mapper operations during the scrounge period, and LANDSAT-D performance evaluation is given.
Semi-automated intra-operative fluoroscopy guidance for osteotomy and external-fixator.
Lin, Hong; Samchukov, Mikhail L; Birch, John G; Cherkashin, Alexander
2006-01-01
This paper outlines a semi-automated intra-operative fluoroscopy guidance and monitoring approach for osteotomy and external-fixator application in orthopedic surgery. Intra-operative Guidance module is one component of the "LegPerfect Suite" developed for assisting the surgical correction of lower extremity angular deformity. The Intra-operative Guidance module utilizes information from the preoperative surgical planning module as a guideline to overlay (register) its bone outline semi-automatically with the bone edge from the real-time fluoroscopic C-Arm X-Ray image in the operating room. In the registration process, scaling factor is obtained automatically through matching a fiducial template in the fluoroscopic image and a marker in the module. A triangle metal plate, placed on the operating table is used as fiducial template. The area of template image within the viewing area of the fluoroscopy machine is obtained by the image processing techniques such as edge detection and Hough transformation to extract the template from other objects in the fluoroscopy image. The area of fiducial template from fluoroscopic image is then compared with the area of the marker from the planning so as to obtain the scaling factor. After the scaling factor is obtained, the user can use simple operations by mouse to shift and rotate the preoperative planning to overlay the bone outline from planning with the bone edge from fluoroscopy image. In this way osteotomy levels and external fixator positioning on the limb can guided by the computerized preoperative plan.
KSC ground operations planning for Space Station
NASA Technical Reports Server (NTRS)
Lyon, J. R.; Revesz, W., Jr.
1993-01-01
At the Kennedy Space Center (KSC) in Florida, processing facilities are being built and activated to support the processing, checkout, and launch of Space Station elements. The generic capability of these facilities will be utilized to support resupply missions for payloads, life support services, and propellants for the 30-year life of the program. Special Ground Support Equipment (GSE) is being designed for Space Station hardware special handling requirements, and a Test, Checkout, and Monitoring System (TCMS) is under development to verify that the flight elements are ready for launch. The facilities and equipment used at KSC, along with the testing required to accomplish the mission, are described in detail to provide an understanding of the complexity of operations at the launch site. Assessments of hardware processing flows through KSC are being conducted to minimize the processing flow times for each hardware element. Baseline operations plans and the changes made to improve operations and reduce costs are described, recognizing that efficient ground operations are a major key to success of the Space Station.
SciBox, an end-to-end automated science planning and commanding system
NASA Astrophysics Data System (ADS)
Choo, Teck H.; Murchie, Scott L.; Bedini, Peter D.; Steele, R. Josh; Skura, Joseph P.; Nguyen, Lillian; Nair, Hari; Lucks, Michael; Berman, Alice F.; McGovern, James A.; Turner, F. Scott
2014-01-01
SciBox is a new technology for planning and commanding science operations for Earth-orbital and planetary space missions. It has been incrementally developed since 2001 and demonstrated on several spaceflight projects. The technology has matured to the point that it is now being used to plan and command all orbital science operations for the MErcury Surface, Space ENvironment, GEochemistry, and Ranging (MESSENGER) mission to Mercury. SciBox encompasses the derivation of observing sequences from science objectives, the scheduling of those sequences, the generation of spacecraft and instrument commands, and the validation of those commands prior to uploading to the spacecraft. Although the process is automated, science and observing requirements are incorporated at each step by a series of rules and parameters to optimize observing opportunities, which are tested and validated through simulation and review. Except for limited special operations and tests, there is no manual scheduling of observations or construction of command sequences. SciBox reduces the lead time for operations planning by shortening the time-consuming coordination process, reduces cost by automating the labor-intensive processes of human-in-the-loop adjudication of observing priorities, reduces operations risk by systematically checking constraints, and maximizes science return by fully evaluating the trade space of observing opportunities to meet MESSENGER science priorities within spacecraft recorder, downlink, scheduling, and orbital-geometry constraints.
29 CFR 4041.22 - Administration of plan during pendency of termination process.
Code of Federal Regulations, 2010 CFR
2010-07-01
... out the normal operations of the plan. During that time period, except as provided in paragraph (b) of... Code to receive the distribution; (2) The distribution is consistent with prior plan practice; and (3) The distribution is not reasonably expected to jeopardize the plan's sufficiency for plan benefits. ...
Challenges in building intelligent systems for space mission operations
NASA Technical Reports Server (NTRS)
Hartman, Wayne
1991-01-01
The purpose here is to provide a top-level look at the stewardship functions performed in space operations, and to identify the major issues and challenges that must be addressed to build intelligent systems that can realistically support operations functions. The focus is on decision support activities involving monitoring, state assessment, goal generation, plan generation, and plan execution. The bottom line is that problem solving in the space operations domain is a very complex process. A variety of knowledge constructs, representations, and reasoning processes are necessary to support effective human problem solving. Emulating these kinds of capabilities in intelligent systems offers major technical challenges that the artificial intelligence community is only beginning to address.
45 CFR 205.37 - Responsibilities of the Administration for Children and Families (ACF).
Code of Federal Regulations, 2013 CFR
2013-10-01
... Processing and Information Retrieval System Guide. The initial advance automatic data processing planning... description of the proposed statewide management system, including the description of information flows, input..., review, assess, and inspect the planning, design, and operation of, statewide management information...
ITS Early Deployment Study, Richmond/ Tri-Cities Area, User Service Plan
DOT National Transportation Integrated Search
1996-05-01
">THE ESSENCE OF THE ITS PLANNING PROCESS IS TO DEVELOP EACH ITS PROGRAM ON THE BASIS OF THE NEEDS OF THE USERS AND OPERATORS OF THE TRANSPORTATION FACILITIES. ALTHOUGH THE PROCESS IS THE SAME NATIONWIDE, THE RESULTS ARE CUSTOMIZED IN EACH COMMUNITY ...
Development and Evaluation of an Intuitive Operations Planning Process
2006-03-01
designed to be iterative and also prescribes the way in which iterations should occur. On the other hand, participants’ perceived level of trust and...16 4. DESIGN AND METHOD OF THE EXPERIMENTAL EVALUATION OF THE INTUITIVE PLANNING PROCESS...20 4.1.3 Design
Strategic planning: the first step in the planning process.
Gelinas, Marc A
2003-01-01
Strategic planning is a systematic process through which an organization builds commitment among key stakeholders to goals and priorities which are essential to its mission and vision, and responsive to the operating environment. Strategic planning is the first step in a comprehensive planning process that also includes business planning and implementation planning. If all three steps are carried out in sequence, strategic planning can be a very effective means of educating the stakeholders about where the cancer program is and where it is going, gaining support and commitment for the direction that the cancer program will take, and assuring that everyone's expectations can be managed effectively. Unfortunately, some organizations and cancer program leaders misunderstand the process. Too often, strategic planning is used as a stand-alone activity. This article will describe what strategic planning is, how it should smoothly lead into business planning and implementation planning, and how to avoid the pitfalls that sometimes arise during the strategic planning effort.
Distributed decision support for the 21st century mission space
NASA Astrophysics Data System (ADS)
McQuay, William K.
2002-07-01
The past decade has produced significant changes in the conduct of military operations: increased humanitarian missions, asymmetric warfare, the reliance on coalitions and allies, stringent rules of engagement, concern about casualties, and the need for sustained air operations. Future mission commanders will need to assimilate a tremendous amount of information, make quick-response decisions, and quantify the effects of those decisions in the face of uncertainty. Integral to this process is creating situational assessment-understanding the mission space, simulation to analyze alternative futures, current capabilities, planning assessments, course-of-action assessments, and a common operational picture-keeping everyone on the same sheet of paper. Decision support tools in a distributed collaborative environment offer the capability of decomposing these complex multitask processes and distributing them over a dynamic set of execution assets. Decision support technologies can semi-automate activities, such as planning an operation, that have a reasonably well-defined process and provide machine-level interfaces to refine the myriad of information that is not currently fused. The marriage of information and simulation technologies provides the mission commander with a collaborative virtual environment for planning and decision support.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-14
... (FFRDC) to facilitate the modernization of business processes and supporting systems and their operations... processes and supporting systems and their operations. Some of the broad task areas that will be utilized..., organizational planning, research and development, continuous process improvement, Independent Verification and...
Operational Planning for Multiple Heterogeneous Unmanned Aerial Vehicles in Three Dimensions
2009-06-01
human input in the planning process. Two solution methods are presented: (1) a mixed-integer program, and (2) an algorithm that utilizes a metaheuristic ...and (2) an algorithm that utilizes a metaheuristic to generate composite variables for a linear program, called the Composite Operations Planning...that represent a path and an associated type of UAV. The reformulation is incorporated into an algorithm that uses a metaheuristic to generate the
New Jersey State Library Technology Plan, 1999-2001.
ERIC Educational Resources Information Center
Breedlove, Elizabeth A., Ed.
This document represents the New Jersey State Library Technology Plan for 1999-2001. Contents include: the mission statement; technology planning process of the Technology Committee (convened by the State Library); specific goals of the Technology Plan 1999-2001; technology assumptions for the operational library and statewide library services;…
Short-range transit planning : current practice and a proposed framework
DOT National Transportation Integrated Search
1984-06-01
The research described in this report explored the service and operations : planning process in the transit industry in a two-phase approach. In the first : phase a detailed assessment of current short range transit planning practice was : undertaken...
Multimodal system planning technique : an analytical approach to peak period operation
DOT National Transportation Integrated Search
1995-11-01
The multimodal system planning technique described in this report is an improvement of the methodology used in the Dallas System Planning Study. The technique includes a spreadsheet-based process to identify the costs of congestion, construction, and...
Institutional Long Range Planning.
ERIC Educational Resources Information Center
Caldwell Community Coll. and Technical Inst., Lenoir, NC.
Long-range institutional planning has been in effect at Caldwell Community College and Technical Institute since 1973. The first step in the process was the identification of planning areas: administration, organization, educational programs, learning resources, student services, faculty, facilities, maintenance/operation, and finances. The major…
Spitzer Mission Operation System Planning for IRAC Warm-Instrument Characterization
NASA Technical Reports Server (NTRS)
Hunt, Joseph C., Jr.; Sarrel, Marc A.; Mahoney, William A.
2010-01-01
This paper will describe how the Spitzer Mission Operations System planned and executed the characterization phase between Spitzer's cryogenic mission and its warm mission. To the largest extend possible, the execution of this phase was done with existing processing and procedures. The modifications that were made were in response to the differences of the characterization phase compared to normal phases before and after. The primary two categories of difference are: unknown date of execution due to uncertainty of knowledge of the date of helium depletion, and the short cycle time for data analysis and re-planning during execution. In addition, all of the planning and design had to be done in parallel with normal operations, and we had to transition smoothly back to normal operations following the transition. This paper will also describe the re-planning we had to do following an anomaly discovered in the first days after helium depletion.
12 CFR 704.12 - Permissible services.
Code of Federal Regulations, 2011 CFR
2011-01-01
... teller machines, online transaction processing through a website, website hosting services, account... liquidity planning and balance sheet modeling and analysis. (6) Operational services. Operational services...
The Preparation for and Execution of Engineering Operations for the Mars Curiosity Rover Mission
NASA Technical Reports Server (NTRS)
Samuels, Jessica A.
2013-01-01
The Mars Science Laboratory Curiosity Rover mission is the most complex and scientifically packed rover that has ever been operated on the surface of Mars. The preparation leading up to the surface mission involved various tests, contingency planning and integration of plans between various teams and scientists for determining how operation of the spacecraft (s/c) would be facilitated. In addition, a focused set of initial set of health checks needed to be defined and created in order to ensure successful operation of rover subsystems before embarking on a two year science journey. This paper will define the role and responsibilities of the Engineering Operations team, the process involved in preparing the team for rover surface operations, the predefined engineering activities performed during the early portion of the mission, and the evaluation process used for initial and day to day spacecraft operational assessment.
The stem cell laboratory: design, equipment, and oversight.
Wesselschmidt, Robin L; Schwartz, Philip H
2011-01-01
This chapter describes some of the major issues to be considered when setting up a laboratory for the culture of human pluripotent stem cells (hPSCs). The process of establishing a hPSC laboratory can be divided into two equally important parts. One is completely administrative and includes developing protocols, seeking approval, and establishing reporting processes and documentation. The other part of establishing a hPSC laboratory involves the physical plant and includes design, equipment and personnel. Proper planning of laboratory operations and proper design of the physical layout of the stem cell laboratory so that meets the scope of planned operations is a major undertaking, but the time spent upfront will pay long-term returns in operational efficiency and effectiveness. A well-planned, organized, and properly equipped laboratory supports research activities by increasing efficiency and reducing lost time and wasted resources.
SU-E-T-419: Workflow and FMEA in a New Proton Therapy (PT) Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cheng, C; Wessels, B; Hamilton, H
2014-06-01
Purpose: Workflow is an important component in the operational planning of a new proton facility. By integrating the concept of failure mode and effect analysis (FMEA) and traditional QA requirements, a workflow for a proton therapy treatment course is set up. This workflow serves as the blue print for the planning of computer hardware/software requirements and network flow. A slight modification of the workflow generates a process map(PM) for FMEA and the planning of QA program in PT. Methods: A flowchart is first developed outlining the sequence of processes involved in a PT treatment course. Each process consists of amore » number of sub-processes to encompass a broad scope of treatment and QA procedures. For each subprocess, the personnel involved, the equipment needed and the computer hardware/software as well as network requirements are defined by a team of clinical staff, administrators and IT personnel. Results: Eleven intermediate processes with a total of 70 sub-processes involved in a PT treatment course are identified. The number of sub-processes varies, ranging from 2-12. The sub-processes within each process are used for the operational planning. For example, in the CT-Sim process, there are 12 sub-processes: three involve data entry/retrieval from a record-and-verify system, two controlled by the CT computer, two require department/hospital network, and the other five are setup procedures. IT then decides the number of computers needed and the software and network requirement. By removing the traditional QA procedures from the workflow, a PM is generated for FMEA analysis to design a QA program for PT. Conclusion: Significant efforts are involved in the development of the workflow in a PT treatment course. Our hybrid model of combining FMEA and traditional QA program serves a duo purpose of efficient operational planning and designing of a QA program in PT.« less
Mousikou, Petroula; Rastle, Kathleen; Besner, Derek; Coltheart, Max
2015-07-01
Dual-route theories of reading posit that a sublexical reading mechanism that operates serially and from left to right is involved in the orthography-to-phonology computation. These theories attribute the masked onset priming effect (MOPE) and the phonological Stroop effect (PSE) to the serial left-to-right operation of this mechanism. However, both effects may arise during speech planning, in the phonological encoding process, which also occurs serially and from left to right. In the present paper, we sought to determine the locus of serial processing in reading aloud by testing the contrasting predictions that the dual-route and speech planning accounts make in relation to the MOPE and the PSE. The results from three experiments that used the MOPE and the PSE paradigms in English are inconsistent with the idea that these effects arise during speech planning, and consistent with the claim that a sublexical serially operating reading mechanism is involved in the print-to-sound translation. Simulations of the empirical data on the MOPE with the dual route cascaded (DRC) and connectionist dual process (CDP++) models, which are computational implementations of the dual-route theory of reading, provide further support for the dual-route account. (c) 2015 APA, all rights reserved.
Underwood, Steven G.; Khalil, Syed M.; Byrnes, Mark R.; Steyer, Gregory D.; Raynie, Richard C
2015-01-01
Development of a comprehensive and stakeholder-driven Regional Sediment Management plan can provide the basis for long-term sustainable resource use and protection. This paper highlights three operational components that can positively influence sediment management at a regional scale, including (1) integration of an operational sediment budget, (2) development of a monitoring and adaptive management plan, and (3) development of a regional sediment availability and allocation program. These components seek to incorporate science and adaptive management through implementation of an organized and well-documented decision making process. They represent a coordinated framework that could serve as a guide for unifying financial investments in regional sediment management plans. Collectively, they establish an integrated process for addressing uncertainties about future system change in light of shrinking federal and state budgets, competing demands for sediment resources within riverine and marine waters, and policy considerations related to sediment/water use (e.g., navigation and commerce versus environmental management).
Responsibility and Responsiveness. The HEW Potential for the Seventies.
ERIC Educational Resources Information Center
Richardson, Elliot L.
The Secretary of HEW presents an overview of departmental undertakings for the purpose of developing more responsible and responsive personnel. The major portion of the statement focuses on internal processes of responsibility and external processes of responsiveness. Departmental strategies, a planning cycle, an operational planning system,…
30 CFR 285.628 - How will MMS process my COP?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 2 2011-07-01 2011-07-01 false How will MMS process my COP? 285.628 Section 285.628 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT... CONTINENTAL SHELF Plans and Information Requirements Contents of the Construction and Operations Plan § 285...
Hospital strategic planning diversity integration based organizational type and CEO tenure.
Newhouse, John J
2007-01-01
The author investigated the strategic planning processes used by five different hospital types to integrate diversity practices into their operations. Chief executive officers from Delaware, New Jersey, New York, and Pennsylvania were surveyed to examine how their hospitals used strategic planning in this process. The central research question was: Does this process vary on the basis of hospital type? The findings indicated that some differences do exist by hospital type, as well as the length of tenure for CEOs in their positions.
2010-01-01
Planning Chapters Chapter 5 provides DSCA planning factors for response to all hazard events. Chapter 6 is a review of safety and operational/composite...risk management processes. Chapters 7 through 11 contain the Concepts of Operation (CONOPS) and details five natural hazards /disasters and the...Restoring critical public services and facilities through temporary measures • Identifying hazard mitigation opportunities 3.3.1.5 Rehabilitation
30 CFR 784.25 - Return of coal processing waste to abandoned underground workings.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Return of coal processing waste to abandoned... ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL... RECLAMATION AND OPERATION PLAN § 784.25 Return of coal processing waste to abandoned underground workings. (a...
30 CFR 784.25 - Return of coal processing waste to abandoned underground workings.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Return of coal processing waste to abandoned... ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL... RECLAMATION AND OPERATION PLAN § 784.25 Return of coal processing waste to abandoned underground workings. (a...
30 CFR 784.25 - Return of coal processing waste to abandoned underground workings.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Return of coal processing waste to abandoned... ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL... RECLAMATION AND OPERATION PLAN § 784.25 Return of coal processing waste to abandoned underground workings. (a...
THE WASHINGTON DATA PROCESSING TRAINING STORY.
ERIC Educational Resources Information Center
MCKEE, R.L.
A DATA PROCESSING TRAINING PROGRAM IN WASHINGTON HAD 10 DATA PROCESSING CENTERS IN OPERATION AND EIGHT MORE IN VARIOUS STAGES OF PLANNING IN 1963. THESE CENTERS WERE FULL-TIME DAY PREPARATORY 2-YEAR POST-HIGH SCHOOL TECHNICIAN TRAINING PROGRAMS, OPERATED AND ADMINISTERED BY THE LOCAL BOARDS OF EDUCATION. EACH SCHOOL HAD A COMPLETE DATA PROCESSING…
NASA Astrophysics Data System (ADS)
Conway, Esther; Waterfall, Alison; Pepler, Sam; Newey, Charles
2015-04-01
In this paper we decribe a business process modelling approach to the integration of exisiting archival activities. We provide a high level overview of existing practice and discuss how procedures can be extended and supported through the description of preservation state. The aim of which is to faciliate the dynamic controlled management of scientific data through its lifecycle. The main types of archival processes considered are: • Management processes that govern the operation of an archive. These management processes include archival governance (preservation state management, selection of archival candidates and strategic management) . • Operational processes that constitute the core activities of the archive which maintain the value of research assets. These operational processes are the acquisition, ingestion, deletion, generation of metadata and preservation actvities, • Supporting processes, which include planning, risk analysis and monitoring of the community/preservation environment. We then proceed by describing the feasability testing of extended risk management and planning procedures which integrate current practices. This was done through the CEDA Archival Format Audit which inspected British Atmospherics Data Centre and National Earth Observation Data Centre Archival holdings. These holdings are extensive, comprising of around 2PB of data and 137 million individual files which were analysed and characterised in terms of format based risk. We are then able to present an overview of the risk burden faced by a large scale archive attempting to maintain the usability of heterogeneous environmental data sets. We conclude by presenting a dynamic data management information model that is capable of describing the preservation state of archival holdings throughout the data lifecycle. We provide discussion of the following core model entities and their relationships: • Aspirational entities, which include Data Entity definitions and their associated Preservation Objectives. • Risk entities, which act as drivers for change within the data lifecycle. These include Acquisitional Risks, Technical Risks, Strategic Risks and External Risks • Plan entities, which detail the actions to bring about change within an archive. These include Acquisition Plans, Preservation Plans and Monitoring plans • The Result entities describe the successful outcomes of the executed plans. These include Acquisitions, Mitigations and Accepted Risks.
Options for Parallelizing a Planning and Scheduling Algorithm
NASA Technical Reports Server (NTRS)
Clement, Bradley J.; Estlin, Tara A.; Bornstein, Benjamin D.
2011-01-01
Space missions have a growing interest in putting multi-core processors onboard spacecraft. For many missions processing power significantly slows operations. We investigate how continual planning and scheduling algorithms can exploit multi-core processing and outline different potential design decisions for a parallelized planning architecture. This organization of choices and challenges helps us with an initial design for parallelizing the CASPER planning system for a mesh multi-core processor. This work extends that presented at another workshop with some preliminary results.
Power system restoration - A task force report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adibi, M.; Clelland, P.; Link, L.
1987-05-01
The IEEE PES System Operation Subcommittee has established the Power System Restoration Task Force to: review operating practices, conduct a literature search, prepare relevant glossaries and bibliographies, and promote information exchange through technical papers. This is the first report of the Task Force. The problem of bulk power system restoration following a complete or partial collapse is practically as old as the electric utility industry itself. Many electric utilities have developed over the years system restoration schemes that meet the needs of their particular systems. These plans provide a great deal of insight into how the restorative process is viewedmore » by operating and planning personnel and what concerns and constraints any plan must operate under.« less
Cohen-Hatton, Sabrina R; Butler, Philip C; Honey, Robert C
2015-08-01
The aim of this study was to better understand the nature of decision making at operational incidents in order to inform operational guidance and training. Normative models of decision making have been adopted in the guidance and training for emergency services. In these models, it is assumed that decision makers assess the current situation, formulate plans, and then execute the plans. However, our understanding of how decision making unfolds at operational incidents remains limited. Incident commanders, attending 33 incidents across six U.K. Fire and Rescue Services, were fitted with helmet-mounted cameras, and the resulting video footage was later independently coded and used to prompt participants to provide a running commentary concerning their decisions. The analysis revealed that assessment of the operational situation was most often followed by plan execution rather than plan formulation, and there was little evidence of prospection about the potential consequences of actions. This pattern of results was consistent across different types of incident, characterized by level of risk and time pressure, but was affected by the operational experience of the participants. Decision making did not follow the sequence of phases assumed by normative models and conveyed in current operational guidance but instead was influenced by both reflective and reflexive processes. These results have clear implications for understanding operational decision making as it occurs in situ and suggest a need for future guidance and training to acknowledge the role of reflexive processes. © 2015, Human Factors and Ergonomics Society.
Quality-assurance plan for water-resources activities of the U.S. Geological Survey in Idaho
Packard, F.A.
1996-01-01
To ensure continued confidence in its products, the Water Resources Division of the U.S. Geological Survey implemented a policy that all its scientific work be performed in accordance with a centrally managed quality-assurance program. This report establishes and documents a formal policy for current (1995) quality assurance within the Idaho District of the U.S. Geological Survey. Quality assurance is formalized by describing district organization and operational responsibilities, documenting the district quality-assurance policies, and describing district functions. The districts conducts its work through offices in Boise, Idaho Falls, Twin Falls, Sandpoint, and at the Idaho National Engineering Laboratory. Data-collection programs and interpretive studies are conducted by two operating units, and operational and technical assistance is provided by three support units: (1) Administrative Services advisors provide guidance on various personnel issues and budget functions, (2) computer and reports advisors provide guidance in their fields, and (3) discipline specialists provide technical advice and assistance to the district and to chiefs of various projects. The district's quality-assurance plan is based on an overall policy that provides a framework for defining the precision and accuracy of collected data. The plan is supported by a series of quality-assurance policy statements that describe responsibilities for specific operations in the district's program. The operations are program planning; project planning; project implementation; review and remediation; data collection; equipment calibration and maintenance; data processing and storage; data analysis, synthesis, and interpretation; report preparation and processing; and training. Activities of the district are systematically conducted under a hierarchy of supervision an management that is designed to ensure conformance with Water Resources Division goals quality assurance. The district quality-assurance plan does not describe detailed technical activities that are commonly termed "quality-control procedures." Instead, it focuses on current policies, operations, and responsibilities that are implemented at the management level. Contents of the plan will be reviewed annually and updated as programs and operations change.
The traverse planning process for D-RATS 2010
NASA Astrophysics Data System (ADS)
Hörz, Friedrich; Lofgren, Gary E.; Gruener, John E.; Eppler, Dean B.; Skinner, James A.; Fortezzo, Corey M.; Graf, Jodi S.; Bluethmann, William J.; Seibert, Marc A.; Bell, Ernest R.
2013-10-01
This report describes the traverse planning process for the Desert Research and Technology Studies (D-RATS) 2010 field simulation of a conceptual 14-day planetary mission. This activity took place between August 23 and September 17, 2010 in the San Francisco Volcanic Field, Arizona. It focused on the utilization of two pressurized rovers and a ground-based communication system, as well as on the development of mission operation concepts for long duration, dual-rover missions. The early planning process began some 12 months prior to the actual field tests and defined the first order engineering-, flight operations, and science objectives. The detailed implementation and refinement of these objectives took place over the ensuing 10 months, resulting in a large number of technical and operational constraints that affected the actual traverse route or the cumulative Extravehicular Activity (EVA) time available for detailed field observations. The science planning proceeded from the generation of photogeologic maps of the test area, to the establishment of prioritized science objectives and associated candidate sites for detailed field exploration. The combination of operational constraints and science objectives resulted in the final design of traverse routes and time lines for each of the 24 traverses needed to support 12 field days by two rovers. Examples of daily traverses will be given that will hopefully illustrate that the design of long duration, long distance planetary traverses is a highly interdisciplinary and time-consuming collaboration between diverse engineers, flight operations personnel, human factors interests, and planetary scientists.
Special event planning for the emergency manager.
Gaynor, Peter T
2009-11-01
In the domain of emergency management and homeland security there is a lack of a formal planning process at the local level when it comes to special event planning. The unique nature of special event planning demands an understanding of the planning process for both traditional and non-traditional planning partners. This understanding will make certain that local governments apply due diligence when planning for the safety of the public. This paper offers a practical roadmap for planning at the local level. It will address those 'special events' that are beyond routine local events but not of a sufficient scale to be granted National Special Security Event status. Due to the infrequency of 'special events' in most communities, it is imperative that deliberate planning takes place. Upon conclusion, the reader will be able to construct a planning process tailored to the needs of their community, guide both traditional and non-traditional planning partners through the planning process, determine priorities, explore alternatives, plan for contingencies, conduct a confirmation brief, facilitate operations and assemble an after-action report and improvement plan.
Energy Systems Test Area (ESTA) Battery Test Operations User Test Planning Guide
NASA Technical Reports Server (NTRS)
Salinas, Michael
2012-01-01
Test process, milestones and inputs are unknowns to first-time users of the ESTA Battery Test Operations. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
WFIRST: User and mission support at ISOC - IPAC Science Operations Center
NASA Astrophysics Data System (ADS)
Akeson, Rachel; Armus, Lee; Bennett, Lee; Colbert, James; Helou, George; Kirkpatrick, J. Davy; Laine, Seppo; Meshkat, Tiffany; Paladini, Roberta; Ramirez, Solange; Wang, Yun; Xie, Joan; Yan, Lin
2018-01-01
The science center for WFIRST is distributed between the Goddard Space Flight Center, the Infrared Processing and Analysis Center (IPAC) and the Space Telescope Science Institute (STScI). The main functions of the IPAC Science Operations Center (ISOC) are:* Conduct the GO, archival and theory proposal submission and evaluation process* Support the coronagraph instrument, including observation planning, calibration and data processing pipeline, generation of data products, and user support* Microlensing survey data processing pipeline, generation of data products, and user support* Community engagement including conferences, workshops and general support of the WFIRST exoplanet communityWe will describe the components planned to support these functions and the community of WFIRST users.
Donnelly, Lane F; Dickerson, Julie M; Lehkamp, Todd W; Gessner, Kevin E; Moskovitz, Jay; Hutchinson, Sally
2008-11-01
As part of a patient safety program in the authors' department of radiology, operational rounds have been instituted. This process consists of radiology leaders' visiting imaging divisions at the site of imaging and discussing frontline employees' concerns about patient safety, the quality of care, and patient and family satisfaction. Operational rounds are executed at a time to optimize the number of attendees. Minutes that describe the issues identified, persons responsible for improvement, and updated improvement plan status are available to employees online. Via this process, multiple patient safety and other issues have been identified and remedied. The authors believe that the process has improved patient safety, the quality of care, and the efficiency of operations. Since the inception of the safety program, the mean number of days between serious safety events involving radiology has doubled. The authors review the background around such walk rounds, describe their particular program, and give multiple illustrative examples of issues identified and improvement plans put in place.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OPERATIONS IN THE OUTER... detailed Mining Plan than is obtainable under an approved Delineation Plan, to prepare feasibility studies, to carry out a pilot program to evaluate processing techniques or technology or mining equipment, or...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OPERATIONS IN THE OUTER... detailed Mining Plan than is obtainable under an approved Delineation Plan, to prepare feasibility studies, to carry out a pilot program to evaluate processing techniques or technology or mining equipment, or...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OPERATIONS IN THE OUTER... detailed Mining Plan than is obtainable under an approved Delineation Plan, to prepare feasibility studies, to carry out a pilot program to evaluate processing techniques or technology or mining equipment, or...
Research on global path planning based on ant colony optimization for AUV
NASA Astrophysics Data System (ADS)
Wang, Hong-Jian; Xiong, Wei
2009-03-01
Path planning is an important issue for autonomous underwater vehicles (AUVs) traversing an unknown environment such as a sea floor, a jungle, or the outer celestial planets. For this paper, global path planning using large-scale chart data was studied, and the principles of ant colony optimization (ACO) were applied. This paper introduced the idea of a visibility graph based on the grid workspace model. It also brought a series of pheromone updating rules for the ACO planning algorithm. The operational steps of the ACO algorithm are proposed as a model for a global path planning method for AUV. To mimic the process of smoothing a planned path, a cutting operator and an insertion-point operator were designed. Simulation results demonstrated that the ACO algorithm is suitable for global path planning. The system has many advantages, including that the operating path of the AUV can be quickly optimized, and it is shorter, safer, and smoother. The prototype system successfully demonstrated the feasibility of the concept, proving it can be applied to surveys of unstructured unmanned environments.
A Markovian model for assessment of personnel hiring plans
NASA Technical Reports Server (NTRS)
Katz, L. G.
1974-01-01
As a result of the current economic environment, many organizations are having to operate with fewer resources. In the manpower area, these constraints have forced organizations to operate within well-defined hiring plans. Exceeding personnel ceilings is in most cases an intolerable situation. A mathematical model, based on the theory of Markov processes, is presented which can be used to assess the chances of success of personnel hiring plans. The model considers a plan to be successful if the final population size, at the end of the planning period, lies within a range specified by management. Although this model was developed to assess personnel hiring plans at the Goddard Space Flight Center, it is directly applicable wherever personnel hiring plans are used.
Improving TOGAF ADM 9.1 Migration Planning Phase by ITIL V3 Service Transition
NASA Astrophysics Data System (ADS)
Hanum Harani, Nisa; Akhmad Arman, Arry; Maulana Awangga, Rolly
2018-04-01
Modification planning of business transformation involving technological utilization required a system of transition and migration planning process. Planning of system migration activity is the most important. The migration process is including complex elements such as business re-engineering, transition scheme mapping, data transformation, application development, individual involvement by computer and trial interaction. TOGAF ADM is the framework and method of enterprise architecture implementation. TOGAF ADM provides a manual refer to the architecture and migration planning. The planning includes an implementation solution, in this case, IT solution, but when the solution becomes an IT operational planning, TOGAF could not handle it. This paper presents a new model framework detail transitions process of integration between TOGAF and ITIL. We evaluated our models in field study inside a private university.
Planning for organization development in operations control centers.
DOT National Transportation Integrated Search
2012-06-01
The first step in a proposed program of organization development (OD) was to assess organizational processes within the : Technical Operations Services (TechOps) Operations Control Centers (OCCs). The aim of the OD program was to : improve effectiven...
Strategic planning in an academic radiation medicine program.
Hamilton, J L; Foxcroft, S; Moyo, E; Cooke-Lauder, J; Spence, T; Zahedi, P; Bezjak, A; Jaffray, D; Lam, C; Létourneau, D; Milosevic, M; Tsang, R; Wong, R; Liu, F F
2017-12-01
In this paper, we report on the process of strategic planning in the Radiation Medicine Program (rmp) at the Princess Margaret Cancer Centre. The rmp conducted a strategic planning exercise to ensure that program priorities reflect the current health care environment, enable nimble responses to the increasing burden of cancer, and guide program operations until 2020. Data collection was guided by a project charter that outlined the project goal and the roles and responsibilities of all participants. The process was managed by a multidisciplinary steering committee under the guidance of an external consultant and consisted of reviewing strategic planning documents from close collaborators and institutional partners, conducting interviews with key stakeholders, deploying a program-wide survey, facilitating an anonymous and confidential e-mail feedback box, and collecting information from group deliberations. The process of strategic planning took place from December 2014 to December 2015. Mission and vision statements were developed, and core values were defined. A final document, Strategic Roadmap to 2020, was established to guide programmatic pursuits during the ensuing 5 years, and an implementation plan was developed to guide the first year of operations. The strategic planning process provided an opportunity to mobilize staff talents and identify environmental opportunities, and helped to enable more effective use of resources in a rapidly changing health care environment. The process was valuable in allowing staff to consider and discuss the future, and in identifying strategic issues of the greatest importance to the program. Academic programs with similar mandates might find our report useful in guiding similar processes in their own organizations.
Strategic planning in an academic radiation medicine program
Hamilton, J.L.; Foxcroft, S.; Moyo, E.; Cooke-Lauder, J.; Spence, T.; Zahedi, P.; Bezjak, A.; Jaffray, D.; Lam, C.; Létourneau, D.; Milosevic, M.; Tsang, R.; Wong, R.; Liu, F.F.
2017-01-01
Background In this paper, we report on the process of strategic planning in the Radiation Medicine Program (rmp) at the Princess Margaret Cancer Centre. The rmp conducted a strategic planning exercise to ensure that program priorities reflect the current health care environment, enable nimble responses to the increasing burden of cancer, and guide program operations until 2020. Methods Data collection was guided by a project charter that outlined the project goal and the roles and responsibilities of all participants. The process was managed by a multidisciplinary steering committee under the guidance of an external consultant and consisted of reviewing strategic planning documents from close collaborators and institutional partners, conducting interviews with key stakeholders, deploying a program-wide survey, facilitating an anonymous and confidential e-mail feedback box, and collecting information from group deliberations. Results The process of strategic planning took place from December 2014 to December 2015. Mission and vision statements were developed, and core values were defined. A final document, Strategic Roadmap to 2020, was established to guide programmatic pursuits during the ensuing 5 years, and an implementation plan was developed to guide the first year of operations. Conclusions The strategic planning process provided an opportunity to mobilize staff talents and identify environmental opportunities, and helped to enable more effective use of resources in a rapidly changing health care environment. The process was valuable in allowing staff to consider and discuss the future, and in identifying strategic issues of the greatest importance to the program. Academic programs with similar mandates might find our report useful in guiding similar processes in their own organizations. PMID:29270061
Balancing Science Objectives and Operational Constraints: A Mission Planner's Challenge
NASA Technical Reports Server (NTRS)
Weldy, Michelle
1996-01-01
The Air Force minute sensor technology integration (MSTI-3) satellite's primary mission is to characterize Earth's atmospheric background clutter. MSTI-3 will use three cameras for data collection, a mid-wave infrared imager, a short wave infrared imager, and a visible imaging spectrometer. Mission science objectives call for the collection of over 2 million images within the one year mission life. In addition, operational constraints limit camera usage to four operations of twenty minutes per day, with no more than 10,000 data and calibrating images collected per day. To balance the operational constraints and science objectives, the mission planning team has designed a planning process to e event schedules and sensor operation timelines. Each set of constraints, including spacecraft performance capabilities, the camera filters, the geographical regions, and the spacecraft-Sun-Earth geometries of interest, and remote tracking station deconflictions has been accounted for in this methodology. To aid in this process, the mission planning team is building a series of tools from commercial off-the-shelf software. These include the mission manifest which builds a daily schedule of events, and the MSTI Scene Simulator which helps build geometrically correct scans. These tools provide an efficient, responsive, and highly flexible architecture that maximizes data collection while minimizing mission planning time.
Application of State Analysis and Goal-based Operations to a MER Mission Scenario
NASA Technical Reports Server (NTRS)
Morris, John Richard; Ingham, Michel D.; Mishkin, Andrew H.; Rasmussen, Robert D.; Starbird, Thomas W.
2006-01-01
State Analysis is a model-based systems engineering methodology employing a rigorous discovery process which articulates operations concepts and operability needs as an integrated part of system design. The process produces requirements on system and software design in the form of explicit models which describe the system behavior in terms of state variables and the relationships among them. By applying State Analysis to an actual MER flight mission scenario, this study addresses the specific real world challenges of complex space operations and explores technologies that can be brought to bear on future missions. The paper first describes the tools currently used on a daily basis for MER operations planning and provides an in-depth description of the planning process, in the context of a Martian day's worth of rover engineering activities, resource modeling, flight rules, science observations, and more. It then describes how State Analysis allows for the specification of a corresponding goal-based sequence that accomplishes the same objectives, with several important additional benefits.
Application of State Analysis and Goal-Based Operations to a MER Mission Scenario
NASA Technical Reports Server (NTRS)
Morris, J. Richard; Ingham, Michel D.; Mishkin, Andrew H.; Rasmussen, Robert D.; Starbird, Thomas W.
2006-01-01
State Analysis is a model-based systems engineering methodology employing a rigorous discovery process which articulates operations concepts and operability needs as an integrated part of system design. The process produces requirements on system and software design in the form of explicit models which describe the behavior of states and the relationships among them. By applying State Analysis to an actual MER flight mission scenario, this study addresses the specific real world challenges of complex space operations and explores technologies that can be brought to bear on future missions. The paper describes the tools currently used on a daily basis for MER operations planning and provides an in-depth description of the planning process, in the context of a Martian day's worth of rover engineering activities, resource modeling, flight rules, science observations, and more. It then describes how State Analysis allows for the specification of a corresponding goal-based sequence that accomplishes the same objectives, with several important additional benefits.
DOE Office of Scientific and Technical Information (OSTI.GOV)
KIRKBRIDE, R.A.
The Tank Waste Remediation System Operation and Utilization Plan updates the operating scenario and plans for the delivery of feed to BNFL Inc., retrieval of waste from single-shell tanks, and the overall process flowsheets for Phases I and II of the privatization of the Tank Waste Remediation System. The plans and flowsheets are updated with the most recent tank-by-tank inventory and sludge washing data. Sensitivity cases were run to evaluate the impact or benefits of proposed changes to the BNFL Inc. contract and to evaluate a risk-based SST retrieval strategy.
Strategic workforce planning for a multihospital, integrated delivery system.
Datz, David; Hallberg, Colleen; Harris, Kathy; Harrison, Lisa; Samples, Patience
2012-01-01
Banner Health has long recognized the need to anticipate, beyond the immediate operational realities or even the annual budgeting projection exercises, the necessary workforce needs of the future. Thus, in 2011, Banner implemented a workforce planning model that included structures, processes, and tools for predicting workforce needs, with particular focus on identified critical systemwide practice areas. The model represents the incorporation of labor management tools and processes with more strategic, broad-view, long-term assessment and planning mechanisms. The sequential tying of the workforce planning lifecycle with the organization's strategy and financial planning process supports alignment of goals, objectives, and resource allocation. Collaboration among strategy, finance, human resources, and operations has provided us with the ability to identify critical position groups based on 3-year strategic priorities. By engaging leaders from across the organization, focusing on activities at facility, regional, and system levels, and building in mechanisms for accountability, we are now engaged in continuous evaluations of our delivery models, the competencies and preparations necessary for the staff to effectively function within those delivery models, and developing and implementing action plans designed to ensure adequate numbers of the staff whose competencies will be suited to the work expected of them.
Transportation Planning with Immune System Derived Approach
NASA Astrophysics Data System (ADS)
Sugiyama, Kenji; Yaji, Yasuhito; Ootsuki, John Takuya; Fujimoto, Yasutaka; Sekiguchi, Takashi
This paper presents an immune system derived approach for planning transportation of materials between manufacturing processes in the factory. Transportation operations are modeled by Petri Net, and divided into submodels. Transportation orders are derived from the firing sequences of those submodels through convergence calculation by the immune system derived excitation and suppression operations. Basic evaluation of this approach is conducted by simulation-based investigation.
Efficiency improvement of technological preparation of power equipment manufacturing
NASA Astrophysics Data System (ADS)
Milukov, I. A.; Rogalev, A. N.; Sokolov, V. P.; Shevchenko, I. V.
2017-11-01
Competitiveness of power equipment primarily depends on speeding-up the development and mastering of new equipment samples and technologies, enhancement of organisation and management of design, manufacturing and operation. Actual political, technological and economic conditions cause the acute need in changing the strategy and tactics of process planning. At that the issues of maintenance of equipment with simultaneous improvement of its efficiency and compatibility to domestically produced components are considering. In order to solve these problems, using the systems of computer-aided process planning for process design at all stages of power equipment life cycle is economically viable. Computer-aided process planning is developed for the purpose of improvement of process planning by using mathematical methods and optimisation of design and management processes on the basis of CALS technologies, which allows for simultaneous process design, process planning organisation and management based on mathematical and physical modelling of interrelated design objects and production system. An integration of computer-aided systems providing the interaction of informative and material processes at all stages of product life cycle is proposed as effective solution to the challenges in new equipment design and process planning.
GPS adjacent-band compatibility assessment plan.
DOT National Transportation Integrated Search
2012-12-01
The Federal Aviation Administration (FAA) and the Research and Innovative Technology : Administration (RITA), both operating Administrations of the DOT, developed this Plan to : provide the framework for definition of the processes and assumptions th...
The Stem Cell Laboratory: Design, Equipment, and Oversight
Wesselschmidt, Robin L.; Schwartz, Philip H.
2013-01-01
This chapter describes some of the major issues to be considered when setting up a laboratory for the culture of human pluripotent stem cells (hPSCs). The process of establishing a hPSC laboratory can be divided into two equally important parts. One is completely administrative and includes developing protocols, seeking approval, and establishing reporting processes and documentation. The other part of establishing a hPSC laboratory involves the physical plant and includes design, equipment and personnel. Proper planning of laboratory operations and proper design of the physical layout of the stem cell laboratory so that meets the scope of planned operations is a major undertaking, but the time spent upfront will pay long-term returns in operational efficiency and effectiveness. A well-planned, organized, and properly equipped laboratory supports research activities by increasing efficiency and reducing lost time and wasted resources. PMID:21822863
NASA Processes and Requirements for Conducting Human-in-the-Loop Closed Chamber Tests
NASA Technical Reports Server (NTRS)
Barta, Daniel J.; Montz, Michael E.
2004-01-01
NASA has specific processes and requirements that must be followed for tests involving human subjects to be conducted in a safe and effective manner. There are five distinct phases of test operations. Phase one, the test request phase, consists of those activities related to initiating, processing, reviewing, and evaluating the test request. Phase two, the test preparation phase consists of those activities related to planning, coordinating, documenting, and building up the test. Phase three, the test readiness phase consists of those activities related to verifying and reviewing the planned test operations. Phase four, the test activity phase, consists of all pretest operations, functional checkouts, emergency drills, and test operations. Phase five, the post test activity phase, consists of those activities performed once the test is completed, including briefings, documentation of anomalies, data reduction and archiving, and reporting. Project management processes must be followed for facility modifications and major test buildup, which include six phases: initiation and assessment, requirements evaluation, preliminary design, detailed design, use readiness review (URR) and acceptance. Compliance with requirements for safety and quality assurance are documented throughout the test buildup and test operation processes. Tests involving human subjects must be reviewed by the applicable Institutional Review Board (IRB).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fraley, John J.; Marotz, Brian L.; DosSantos, Joseph M.
In this document we present fisheries losses, mitigation alternatives, and recommendations to protect, mitigate, and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan addresses six separate program measures in the 1987 Columbia Basin Fish and Wildlife Program. We designed the plan to be closely coordinated in terms of dam operations, funding, and activities with the Kerr Mitigation Plan presently before the Federal Energy Regulatory Commission. This document represents a mitigation plan for consideration by the Northwest Power Planning Council process; it is not an implementation plan. Flathead Lake is onemore » of the cleanest lakes of its size in the world. The exceptional water quality and unique native fisheries make the Flathead Lake/River system extremely valuable to the economy and quality of life in the basin. The recreational fishery in Flathead Lake has an estimated value of nearly eight million dollars annually. This mitigation process represents our best opportunity to reduce the impacts of hydropower in this valuable aquatic system and increase angling opportunity. We based loss estimates and mitigation alternatives on an extensive data base, agency reports, nationally and internationally peer-reviewed scientific articles, and an innovative biological model for Hungry Horse Reservoir and the Flathead River. We conducted an extensive, 14-month scoping and consultation process with agency representatives, representatives of citizen groups, and the general public. This consultation process helped identify issues, areas of agreement, areas of conflict, and advantages and disadvantages of mitigation alternatives. The results of the scoping and consultation process helped shape our mitigation plan. Our recommended plan is based firmly on principles of adaptive management and recognition of biological uncertainty. After we receive direction from the NPPC, we will add more detailed hypotheses and other features necessary for a long-term implementation plan.« less
2008-06-01
capacity planning; • Electrical generation capacity planning; • Machine scheduling; • Freight scheduling; • Dairy farm expansion planning...Support Systems and Multi Criteria Decision Analysis Products A.2.11.2.2.1 ELECTRE IS ELECTRE IS is a generalization of ELECTRE I. It is a...criteria, ELECTRE IS supports the user in the process of selecting one alternative or a subset of alternatives. The method consists of two parts
Guillermo A. Mendoza; Roger J. Meimban; Philip A. Araman; William G. Luppold
1991-01-01
A log inventory model and a real-time hardwood process simulation model were developed and combined into an integrated production planning and control system for hardwood sawmills. The log inventory model was designed to monitor and periodically update the status of the logs in the log yard. The process simulation model was designed to estimate various sawmill...
What Would Ozymandias Think about Disaster Planning?
ERIC Educational Resources Information Center
Voss, Brian D.
2006-01-01
In this article, the author discusses disaster-recovery planning in light of his personal experience following Hurricane Katrina. He relates the advice he received from Captain Joseph R. Castillo, Chief of Operations for the U.S. Coast Guard Eighth District in New Orleans: Focus on the process of planning, and not on building a plan. The author…
Bye, Robin T; Neilson, Peter D
2010-10-01
Physiological tremor during movement is characterized by ∼10 Hz oscillation observed both in the electromyogram activity and in the velocity profile. We propose that this particular rhythm occurs as the direct consequence of a movement response planning system that acts as an intermittent predictive controller operating at discrete intervals of ∼100 ms. The BUMP model of response planning describes such a system. It forms the kernel of Adaptive Model Theory which defines, in computational terms, a basic unit of motor production or BUMP. Each BUMP consists of three processes: (1) analyzing sensory information, (2) planning a desired optimal response, and (3) execution of that response. These processes operate in parallel across successive sequential BUMPs. The response planning process requires a discrete-time interval in which to generate a minimum acceleration trajectory to connect the actual response with the predicted future state of the target and compensate for executional error. We have shown previously that a response planning time of 100 ms accounts for the intermittency observed experimentally in visual tracking studies and for the psychological refractory period observed in double stimulation reaction time studies. We have also shown that simulations of aimed movement, using this same planning interval, reproduce experimentally observed speed-accuracy tradeoffs and movement velocity profiles. Here we show, by means of a simulation study of constant velocity tracking movements, that employing a 100 ms planning interval closely reproduces the measurement discontinuities and power spectra of electromyograms, joint-angles, and angular velocities of physiological tremor reported experimentally. We conclude that intermittent predictive control through sequential operation of BUMPs is a fundamental mechanism of 10 Hz physiological tremor in movement. Copyright © 2010 Elsevier B.V. All rights reserved.
Runway Operations Planning: A Two-Stage Solution Methodology
NASA Technical Reports Server (NTRS)
Anagnostakis, Ioannis; Clarke, John-Paul
2003-01-01
The airport runway is a scarce resource that must be shared by different runway operations (arrivals, departures and runway crossings). Given the possible sequences of runway events, careful Runway Operations Planning (ROP) is required if runway utilization is to be maximized. Thus, Runway Operations Planning (ROP) is a critical component of airport operations planning in general and surface operations planning in particular. From the perspective of departures, ROP solutions are aircraft departure schedules developed by optimally allocating runway time for departures given the time required for arrivals and crossings. In addition to the obvious objective of maximizing throughput, other objectives, such as guaranteeing fairness and minimizing environmental impact, may be incorporated into the ROP solution subject to constraints introduced by Air Traffic Control (ATC) procedures. Generating optimal runway operations plans was approached in with a 'one-stage' optimization routine that considered all the desired objectives and constraints, and the characteristics of each aircraft (weight class, destination, Air Traffic Control (ATC) constraints) at the same time. Since, however, at any given point in time, there is less uncertainty in the predicted demand for departure resources in terms of weight class than in terms of specific aircraft, the ROP problem can be parsed into two stages. In the context of the Departure Planner (OP) research project, this paper introduces Runway Operations Planning (ROP) as part of the wider Surface Operations Optimization (SOO) and describes a proposed 'two stage' heuristic algorithm for solving the Runway Operations Planning (ROP) problem. Focus is specifically given on including runway crossings in the planning process of runway operations. In the first stage, sequences of departure class slots and runwy crossings slots are generated and ranked based on departure runway throughput under stochastic conditions. In the second stage, the departure class slots are populated with specific flights from the pool of available aircraft, by solving an integer program. Preliminary results from the algorithm implementation on real-world traffic data are included.
78 FR 40745 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-08
.... Description: The Advance Planning Document (APD) process, established in the rules at 45 CFR part 95, subpart F, is the procedure by which States request and obtain approval for Federal financial participation... Advance Planning Document 34 1.2 120 4,896 Operational Advance Planning Document 20 1 30 600 Estimated...
78 FR 14556 - Proposed Information Collection Activity; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-06
... for ACF. OMB No.: 0992-0005. Description: The Advance Planning Document (APD) process, established in... Biennial Reports 54 1 1.50 81 Advance Planning Document 34 1.2 120 4,896 Operational Advance Planning... for the proper performance of the functions of the agency, including whether the information shall...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-16
... (CAISO) proposed Revised Transmission Planning Process (RTPP).\\1\\ Take notice that such conference will... California Transmission Planning Group, and complies with the transmission planning principles of Order No. 890; How the various categories of transmission projects will be defined and differentiated; To what...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Abel, L.W.
1996-05-01
This article discusses the methodology, design philosophy, and guidelines for planning a dynamic-kill operation for a wild well. The topics covered are two methods of computer analysis for designing dynamic-kill requirements, the design process, determining the pumping spread, and the pitfalls that a designer faces in planning a dynamic kill.
40 CFR 63.1368 - Reporting requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... operating permit. (B) Duration of excursions, as defined in § 63.1366(b)(7). (C) Operating logs and... storage vessel subject to control requirements: (A) Actual periods of planned routine maintenance during... process, as defined in § 63.1361. (i) A brief description of the process change; (ii) A description of any...
Improving Program Performance through Management Information. A Workbook.
ERIC Educational Resources Information Center
Bienia, Nancy
Designed specifically for state and local managers and supervisors who plan, direct, and operate child support enforcement programs, this workbook provides a four-part, step-by-step process for identifying needed information and methods of using the information to operate an effective program. The process consists of: (1) determining what…
Minimization In Digital Design As A Meta-Planning Problem
NASA Astrophysics Data System (ADS)
Ho, William P. C.; Wu, Jung-Gen
1987-05-01
In our model-based expert system for automatic digital system design, we formalize the design process into three sub-processes - compiling high-level behavioral specifications into primitive behavioral operations, grouping primitive operations into behavioral functions, and grouping functions into modules. Consideration of design minimization explicitly controls decision-making in the last two subprocesses. Design minimization, a key task in the automatic design of digital systems, is complicated by the high degree of interaction among the time sequence and content of design decisions. In this paper, we present an AI approach which directly addresses these interactions and their consequences by modeling the minimization prob-lem as a planning problem, and the management of design decision-making as a meta-planning problem.
Advanced planning for ISS payload ground processing
NASA Astrophysics Data System (ADS)
Page, Kimberly A.
2000-01-01
Ground processing at John F. Kennedy Space Center (KSC) is the concluding phase of the payload/flight hardware development process and is the final opportunity to ensure safe and successful recognition of mission objectives. Planning for the ground processing of on-orbit flight hardware elements and payloads for the International Space Station is a responsibility taken seriously at KSC. Realizing that entering into this operational environment can be an enormous undertaking for a payload customer, KSC continually works to improve this process by instituting new/improved services for payload developer/owner, applying state-of-the-art technologies to the advanced planning process, and incorporating lessons learned for payload ground processing planning to ensure complete customer satisfaction. This paper will present an overview of the KSC advanced planning activities for ISS hardware/payload ground processing. It will focus on when and how KSC begins to interact with the payload developer/owner, how that interaction changes (and grows) throughout the planning process, and how KSC ensures that advanced planning is successfully implemented at the launch site. It will also briefly consider the type of advance planning conducted by the launch site that is transparent to the payload user but essential to the successful processing of the payload (i.e. resource allocation, executing documentation, etc.) .
Maintaining consistency between planning hierarchies: Techniques and applications
NASA Technical Reports Server (NTRS)
Zoch, David R.
1987-01-01
In many planning and scheduling environments, it is desirable to be able to view and manipulate plans at different levels of abstraction, allowing the users the option of viewing and manipulating either a very detailed representation of the plan or a high-level more abstract version of the plan. Generating a detailed plan from a more abstract plan requires domain-specific planning/scheduling knowledge; the reverse process of generating a high-level plan from a detailed plan Reverse Plan Maintenance, or RPM) requires having the system remember the actions it took based on its domain-specific knowledge and its reasons for taking those actions. This reverse plan maintenance process is described as implemented in a specific planning and scheduling tool, The Mission Operations Planning Assistant (MOPA), as well as the applications of RPM to other planning and scheduling problems; emphasizing the knowledge that is needed to maintain the correspondence between the different hierarchical planning levels.
TLOG: Training and Educating Operational Logistic Planners
2008-05-22
monograph recommends specific changes to the current curriculum. Additions in operational knowledge provide the students technical knowledge and a...common frame of reference in campaign planning. The changes result in students not only technically competent to design a concept of support, but...planning process. The implementation of these changes enhance TLog’s curriculum to meet the course’s stated goal; the graduates will be the
Training Community Modeling and Simulation Business Plan: 2009 Edition
2010-04-01
strategic information assurance 33 33 Provide crisis action procedures training 34 34 Provide the IC SOF-specific training at the operational level... information and products • Collaborative analysis processes • Dissemination of information throughout a command and to subordinates by redundant means...centric M&S capabilities will improve training for information warfare, assist with training for homeland defense operations, crisis -management plan- ning
NASA Planning for Orion Multi-Purpose Crew Vehicle Ground Operations
NASA Technical Reports Server (NTRS)
Letchworth, Gary; Schlierf, Roland
2011-01-01
The NASA Orion Ground Processing Team was originally formed by the Kennedy Space Center (KSC) Constellation (Cx) Project Office's Orion Division to define, refine and mature pre-launch and post-landing ground operations for the Orion human spacecraft. The multidisciplined KSC Orion team consisted of KSC civil servant, SAIC, Productivity Apex, Inc. and Boeing-CAPPS engineers, project managers and safety engineers, as well as engineers from Constellation's Orion Project and Lockheed Martin Orion Prime contractor. The team evaluated the Orion design configurations as the spacecraft concept matured between Systems Design Review (SDR), Systems Requirement Review (SRR) and Preliminary Design Review (PDR). The team functionally decomposed prelaunch and post-landing steps at three levels' of detail, or tiers, beginning with functional flow block diagrams (FFBDs). The third tier FFBDs were used to build logic networks and nominal timelines. Orion ground support equipment (GSE) was identified and mapped to each step. This information was subsequently used in developing lower level operations steps in a Ground Operations Planning Document PDR product. Subject matter experts for each spacecraft and GSE subsystem were used to define 5th - 95th percentile processing times for each FFBD step, using the Delphi Method. Discrete event simulations used this information and the logic network to provide processing timeline confidence intervals for launch rate assessments. The team also used the capabilities of the KSC Visualization Lab, the FFBDs and knowledge of the spacecraft, GSE and facilities to build visualizations of Orion pre-launch and postlanding processing at KSC. Visualizations were a powerful tool for communicating planned operations within the KSC community (i.e., Ground Systems design team), and externally to the Orion Project, Lockheed Martin spacecraft designers and other Constellation Program stakeholders during the SRR to PDR timeframe. Other operations planning tools included Kaizen/Lean events, mockups and human factors analysis. The majority of products developed by this team are applicable as KSC prepares 21st Century Ground Systems for the Orion Multi-Purpose Crew Vehicle and Space Launch System.
NASA Technical Reports Server (NTRS)
2005-01-01
The purpose of this document is to analyze the impact of Remotely Operated Aircraft (ROA) operations on current and planned Air Traffic Control (ATC) automation systems in the En Route, Terminal, and Traffic Flow Management domains. The operational aspects of ROA flight, while similar, are not entirely identical to their manned counterparts and may not have been considered within the time-horizons of the automation tools. This analysis was performed to determine if flight characteristics of ROAs would be compatible with current and future NAS automation tools. Improvements to existing systems / processes are recommended that would give Air Traffic Controllers an indication that a particular aircraft is an ROA and modifications to IFR flight plan processing algorithms and / or designation of airspace where an ROA will be operating for long periods of time.
Preparing the Army for Stability Operations: Doctrinal and Interagency Issues
2007-01-01
discuss these issues at length in Chapter Three). Similarly, the Draft Planning Framework is not yet part of the military planning process. It remains a...Draft Planning Framework for Reconstruction, Stabilization, and Conflict Transformation . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 The...level from the perspective of impli- cations for the Army and its development of SSTR capabilities. The U.S. Government Draft Planning Framework for
Total Quality Management Implementation Plan.
1989-06-01
Quality Management Implementation Plan 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING ORGANIZATION Defense General...E 14. SUBJECT TERMS 15. NUMBER OF PAGES TOM (Total Quality Management ), Continuous Process Improvement,_________ Depot Operations, Supply Support 16
Code of Federal Regulations, 2010 CFR
2010-04-01
... AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR PROVISIONS GOVERNING THE SENIOR COMMUNITY SERVICE EMPLOYMENT PROGRAM The State Senior Employment Services Coordination Plan § 641.320 Must all national...
40 CFR 62.14575 - What must I do if I close my CISWI unit and then restart it?
Code of Federal Regulations, 2011 CFR
2011-07-01
... FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration... necessary process changes and air pollution control devices operate as designed. Waste Management Plan ...
Knowledge enabled plan of care and documentation prototype.
DaDamio, Rebecca; Gugerty, Brian; Kennedy, Rosemary
2006-01-01
There exist significant challenges in integrating the plan of care into documentation and point of care operational processes. A plan of care is often a static artifact that meets regulatory standards with limited influence on supporting goal-directed care delivery processes. Although this prototype is applicable to many clinical disciplines, we will highlight nursing processes in demonstrating a knowledge-driven computerized solution that fully integrates the plan of care within documentation. The knowledge-driven solution reflects evidenced-based practice; is an effective tool for managing problems, orders/interventions, and the patient's progress towards expected outcomes; meets regulatory standards; and drives quality and process improvement. The knowledge infrastructure consists of fully represented terminology, structured clinical expressions utilizing the controlled terminology and clinical knowledge representing evidence-based practice.
Blos, Mauricio F; Wee, Hui-Ming; Yang, Joshua
2010-11-01
Innovation challenges for handling supply chain risks have become one of the most important drivers in business competitiveness and differentiation. This study analyses competitiveness at the external supply chain level as a driver of risks and provides a framework for mitigating these risks. The mitigation framework, also called the supply chain continuity framework, provides insight into six stages of the business continuity planning (BCP) process life cycle (risk mitigation management, business impact analysis, supply continuity strategy development, supply continuity plan development, supply continuity plan testing and supply continuity plan maintenance), together with the operational constructs: customer service, inventory management, flexibility, time to market, ordering cycle time and quality. The purpose of the BCP process life cycle and operational constructs working together is to emphasise the way in which a supply chain can deal with disruption risks and, consequently, bring competitive advantage. Future research will consider the new risk scenarios and analyse the consequences to promote the improvement of supply chain resilience.
The United States national volcanic ash operations plan for aviation
Albersheim, Steven; Guffanti, Marianne
2009-01-01
Volcanic-ash clouds are a known hazard to aviation, requiring that aircraft be warned away from ash-contaminated airspace. The exposure of aviation to potential hazards from volcanoes in the United States is significant. In support of existing interagency operations to detect and track volcanic-ash clouds, the United States has prepared a National Volcanic Ash Operations Plan for Aviation to strengthen the warning process in its airspace. The US National Plan documents the responsibilities, communication protocols, and prescribed hazard messages of the Federal Aviation Administration, National Oceanic and Atmospheric Administration, US Geological Survey, and Air Force Weather Agency. The plan introduces a new message format, a Volcano Observatory Notice for Aviation, to provide clear, concise information about volcanic activity, including precursory unrest, to air-traffic controllers (for use in Notices to Airmen) and other aviation users. The plan is online at http://www.ofcm.gov/p35-nvaopa/pdf/FCM-P35-2007-NVAOPA.pdf. While the plan provides general operational practices, it remains the responsibility of the federal agencies involved to implement the described procedures through orders, directives, etc. Since the plan mirrors global guidelines of the International Civil Aviation Organization, it also provides an example that could be adapted by other countries.
Facility effluent monitoring plan for the plutonium uranium extraction facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wiegand, D.L.
A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of themore » effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bradley, E.C.; Killough, S.M.; Rowe, J.C.
The purpose of the Smart Crane Ammunition Transfer System (SCATS) project is to demonstrate robotic/telerobotic controls technology for a mobile articulated crane for missile/ munitions handling, delivery, and reload. Missile resupply and reload have been manually intensive operations up to this time. Currently, reload missiles are delivered by truck to the site of the launcher. A crew of four to five personnel reloads the missiles from the truck to the launcher using a hydraulic-powered crane. The missiles are handled carefully for the safety of the missiles and personnel. Numerous steps are required in the reload process and the entire reloadmore » operation can take over 1 h for some missile systems. Recent U.S. Army directives require the entire operation to be accomplished in a fraction of that time. Current requirements for the development of SCATS are being based primarily on reloading Patriot missiles. The planned development approach will integrate robotic control and sensor technology with a commercially available hydraulic articulated crane. SCATS is being developed with commercially available hardware as much as possible. Development plans include adding a 3-D.F. end effector with a grapple to the articulating crane; closed-loop position control for the crane and end effector; digital microprocessor control of crane functions; simplified operator interface; and operating modes which include rectilinear movement, obstacle avoidance, and partial automated operation. The planned development will include progressive technology demonstrations. Ultimate plans are for this technology to be transferred and utilized in the military fielding process.« less
78 FR 37819 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-24
.... Description: The Advance Planning Document (APD) process, established in the rules at 45 CFR Part 95, Subpart F, is the procedure by which States request and obtain approval for Federal financial participation... Advance Planning Document 34 1.2 120 4,896 Operational Advance Planning Document 20 1 30 600 [[Page 37820...
At the Ready: Planning for Business Continuity
ERIC Educational Resources Information Center
Sharp, Linda
2011-01-01
School system leaders never know when disaster may strike. Having a plan in place to protect vital data and systems is crucial. School system leaders need to be actively involved in crisis preparedness, planned response, and recovery to ensure student and staff safety and to make certain that all important operations, services, processes, and…
Manpower Goals Planning and Accountability. Research Report 34.
ERIC Educational Resources Information Center
Niehaus, R. J.; Nitterhouse, D.
Based on previous application of goal programming models to manpower goals planning for large organizations, this paper structures the extensions from the planning process to the operations and control aspects of the management cycle. Emphasis is on the accountability necessary to make such a system an effective management control tool. In order…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-20
... Environmental Protection Agency is planning to submit an information collection request (ICR), ``Final Rule at.... citizens or groups of citizens planning travel to Antarctica on an expedition for which they are not acting... identified and considered by the operator during the planning process and that to the extent practicable...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-23
..., operate, maintain and decommission a maximum 350 megawatt (MW) photovoltaic facility and necessary... for renewable energy development. You may submit comments on issues and planning criteria in writing... considered through the plan amendment process to determine the suitability of the site for renewable energy...
Division 1137 property control system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pastor, D.J.
1982-01-01
An automated data processing property control system was developed by Mobile and Remote Range Division 1137. This report describes the operation of the system and examines ways of using it in operational planning and control.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tao Tang; Tan Zhu; He Xu
China currently put forwards 'striving to build an environmentally friendly society' as one of the most important development goals. The land administration authorities are facing the challenge of effectively incorporating environment considerations into their planning system. This paper aims to investigate why and how Strategic Environmental Assessment (SEA) is enacted as an effective tool to integrate the environment into land-use planning during the construction process of an environmentally friendly society in China, and identify factors that influence the integration. It presents characteristics of the land-use planning system, and reviews the progress and current state of SEA in China. Results showmore » that SEA provides many benefits in promoting environmental considerations into the land-use planning process. The legal frameworks and operational procedures, in the context of land-use master planning SEA, are summarized and an assessment made of their effectiveness. Some barriers are highlighted through examination of the latest case studies, and several recommendations are presented to overcome these obstacles.« less
Expanding the Targeting Process into the Space Domain
2008-06-01
planning and operations. The process is a continuous method by which information is converted into intelligence and made available to users...Targeting personnel and organizations consume intelligence produced by various agencies and organizations. Actionable and predictive intelligence applies to... intelligence and operations communities (Figure 1). 1 United States Department of Defense Joint
NASA Technical Reports Server (NTRS)
Chien, S.
1994-01-01
This paper describes work on the Multimission VICAR Planner (MVP) system to automatically construct executable image processing procedures for custom image processing requests for the JPL Multimission Image Processing Lab (MIPL). This paper focuses on two issues. First, large search spaces caused by complex plans required the use of hand encoded control information. In order to address this in a manner similar to that used by human experts, MVP uses a decomposition-based planner to implement hierarchical/skeletal planning at the higher level and then uses a classical operator based planner to solve subproblems in contexts defined by the high-level decomposition.
VirSSPA- a virtual reality tool for surgical planning workflow.
Suárez, C; Acha, B; Serrano, C; Parra, C; Gómez, T
2009-03-01
A virtual reality tool, called VirSSPA, was developed to optimize the planning of surgical processes. Segmentation algorithms for Computed Tomography (CT) images: a region growing procedure was used for soft tissues and a thresholding algorithm was implemented to segment bones. The algorithms operate semiautomati- cally since they only need seed selection with the mouse on each tissue segmented by the user. The novelty of the paper is the adaptation of an enhancement method based on histogram thresholding applied to CT images for surgical planning, which simplifies subsequent segmentation. A substantial improvement of the virtual reality tool VirSSPA was obtained with these algorithms. VirSSPA was used to optimize surgical planning, to decrease the time spent on surgical planning and to improve operative results. The success rate increases due to surgeons being able to see the exact extent of the patient's ailment. This tool can decrease operating room time, thus resulting in reduced costs. Virtual simulation was effective for optimizing surgical planning, which could, consequently, result in improved outcomes with reduced costs.
Elevating the role of finance at Mary Lanning Healthcare.
Hoffman, Amanda; Spence, Jay
2013-11-01
To effectively partner with hospital operations leaders, healthcare finance leaders should: Streamline and align financial planning and budgeting functions across the organization; Ensure capital planning is regarded as a strategic process; Optimize performance monitoring across management levels.
7 CFR 1470.22 - Conservation stewardship plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS CONSERVATION STEWARDSHIP PROGRAM Contracts... process as outlined in the National Planning Procedures Handbook to encourage participants to address... the participant's decisions that describes the schedule of conservation activities to be implemented...
Satellite land use acquisition and applications to hydrologic planning models
NASA Technical Reports Server (NTRS)
Algazi, V. R.; Suk, M.
1977-01-01
A developing operational procedure for use by the Corps of Engineers in the acquisition of land use information for hydrologic planning purposes was described. The operational conditions preclude the use of dedicated, interactive image processing facilities. Given the constraints, an approach to land use classification based on clustering seems promising and was explored in detail. The procedure is outlined and examples of application to two watersheds given.
2013-01-07
of MFOP principles on processes, procedures , and costs in acquisition planning. It investigates MFOP and reviews the results of a 2005 submarine pilot...approach be a game changer? This paper evaluates the potential impact of MFOP principles on processes, procedures , and costs in acquisition planning. It...elli=lc=_rpfkbpp=C=mr_if`=mlif`v= = - 2 - k^s^i=mlpqdo^ar^qb=p`elli= procedures , and costs in acquisition planning. The scope of the research was to
ERIC Educational Resources Information Center
Anderson, Nancy; And Others
This is one of a set of five handbooks compiled by the Northwest Regional Educational Laboratory that describes the processes for planning and operating a total experience-based career education (EBCE) program. Processes and material are those developed by the original EBCE model--Community Experience in Career Education (CE)2. The area of…
Strategic Studies Quarterly. Volume 5, Number 2, Summer 2011
2011-01-01
Afghanistan. We also made progress in our support of operational planning by the combatant commanders and in building processes for them to issue...transformation of the department’s networks; • work with the combatant commands to synchronize processes and planning to deliver the joint effects...own actions and forces. Note that these and many other factors determining the process of deter- rence have as much to do with an opponent’s unique
Strategic Management Plan. FY11
2010-12-30
process flows . Many of the improvements sought in this SMP require us to think about our business operations from an end-to-end perspective because the...underlying processes cut across many of our traditional organizations and functional business areas. The 15 end-to-end process flows that were...Redeployment/ Retrograde • Environmental Liabilities • Hire-to-Retire (H2R) • Market-to-Prospect (M2P) • Order-to- Cash (O2C) • Plan-to-Stock
Radiological incident preparedness: planning at the local level.
Tan, Clive M; Barnett, Daniel J; Stolz, Adam J; Links, Jonathan M
2011-03-01
Radiological terrorism has been recognized as a probable scenario with high impact. Radiological preparedness planning at the federal and state levels has been encouraging, but translating complex doctrines into operational readiness at the local level has proved challenging. Based on the authors' experience with radiological response planning for the City of Baltimore, this article describes an integrated approach to municipal-level radiological emergency preparedness planning, provides information on resources that are useful for radiological preparedness planning, and recommends a step-by-step process toward developing the plan with relevant examples from the experience in Baltimore. Local governmental agencies constitute the first line of response and are critical to the success of the operation. This article is intended as a starting framework for local governmental efforts toward developing a response plan for radiological incidents in their communities.
OʼHara, Susan
2014-01-01
Nurses have increasingly been regarded as critical members of the planning team as architects recognize their knowledge and value. But the nurses' role as knowledge experts can be expanded to leading efforts to integrate the clinical, operational, and architectural expertise through simulation modeling. Simulation modeling allows for the optimal merge of multifactorial data to understand the current state of the intensive care unit and predict future states. Nurses can champion the simulation modeling process and reap the benefits of a cost-effective way to test new designs, processes, staffing models, and future programming trends prior to implementation. Simulation modeling is an evidence-based planning approach, a standard, for integrating the sciences with real client data, to offer solutions for improving patient care.
Strategic planning for hotel operations: The Ritz-Carlton Hotel Company (Part II).
Shriver, S J
1993-01-01
The Ritz-Carlton Hotel Company won the Malcolm Baldrige National Quality Award in 1992. One key to its success is its strategic planning process. In this second part of a two-part article, Stephen Shriver concludes his review of the Ritz-Carlton's approach to strategic planning. Shriver begins by outlining some key steps in plan development and goes on to describe how the Ritz-Carlton disseminates, implements, and evaluates the plan.
Science Planning and Orbit Classification for Solar Probe Plus
NASA Astrophysics Data System (ADS)
Kusterer, M. B.; Fox, N. J.; Rodgers, D. J.; Turner, F. S.
2016-12-01
There are a number of challenges for the Science Planning Team (SPT) of the Solar Probe Plus (SPP) Mission. Since SPP is using a decoupled payload operations approach, tight coordination between the mission operations and payload teams will be required. The payload teams must manage the volume of data that they write to the spacecraft solid-state recorders (SSR) for their individual instruments for downlink to the ground. Making this process more difficult, the geometry of the celestial bodies and the spacecraft during some of the SPP mission orbits cause limited uplink and downlink opportunities. The payload teams will also be required to coordinate power on opportunities, command uplink opportunities, and data transfers from instrument memory to the spacecraft SSR with the operation team. The SPT also intend to coordinate observations with other spacecraft and ground based systems. To solve these challenges, detailed orbit activity planning is required in advance for each orbit. An orbit planning process is being created to facilitate the coordination of spacecraft and payload activities for each orbit. An interactive Science Planning Tool is being designed to integrate the payload data volume and priority allocations, spacecraft ephemeris, attitude, downlink and uplink schedules, spacecraft and payload activities, and other spacecraft ephemeris. It will be used during science planning to select the instrument data priorities and data volumes that satisfy the orbit data volume constraints and power on, command uplink and data transfer time periods. To aid in the initial stages of science planning we have created an orbit classification scheme based on downlink availability and significant science events. Different types of challenges arise in the management of science data driven by orbital geometry and operational constraints, and this scheme attempts to identify the patterns that emerge.
3718-F Alkali Metal Treatment and Storage Facility Closure Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
Since 1987, Westinghouse Hanford Company has been a major contractor to the U.S. Department of Energy-Richland Operations Office and has served as co-operator of the 3718-F Alkali Metal Treatment and Storage Facility, the waste management unit addressed in this closure plan. The closure plan consists of a Part A Dangerous waste Permit Application and a RCRA Closure Plan. An explanation of the Part A Revision (Revision 1) submitted with this document is provided at the beginning of the Part A section. The closure plan consists of 9 chapters and 5 appendices. The chapters cover: introduction; facility description; process information; wastemore » characteristics; groundwater; closure strategy and performance standards; closure activities; postclosure; and references.« less
Team processes in airway facilities operations control centers.
DOT National Transportation Integrated Search
2000-07-01
In October 2000, the Airway Facilities organization plans to transition the National Airspace System (NAS) monitoring responsibilities to three regional Operations Control Centers (OCCs). Teams in these facilities will be different from those that cu...
Pandemic Ventilator Rationing and Appeals Processes
Patrone, Daniel; Resnik, David
2014-01-01
In a severe influenza pandemic, hospitals will likely experience serious and widespread shortages of patient pulmonary ventilators and of staff qualified to operate them. Deciding who will receive access to mechanical ventilation will often determine who lives and who dies. This prospect raises an important question whether pandemic preparedness plans should include some process by which individuals affected by ventilator rationing would have the opportunity to appeal adverse decisions. However, the issue of appeals processes to ventilator rationing decisions has been largely neglected in state pandemic planning efforts. If we are to devise just and effective plans for coping with a severe influenza pandemic, more attention to the issue of appeals processes for pandemic ventilator rationing decisions is needed. Arguments for and against appeals processes are considered, and some suggestions are offered to help efforts at devising more rational pandemic preparedness plans. PMID:20354793
Pandemic ventilator rationing and appeals processes.
Patrone, Daniel; Resnik, David
2011-06-01
In a severe influenza pandemic, hospitals will likely experience serious and widespread shortages of patient pulmonary ventilators and of staff qualified to operate them. Deciding who will receive access to mechanical ventilation will often determine who lives and who dies. This prospect raises an important question whether pandemic preparedness plans should include some process by which individuals affected by ventilator rationing would have the opportunity to appeal adverse decisions. However, the issue of appeals processes to ventilator rationing decisions has been largely neglected in state pandemic planning efforts. If we are to devise just and effective plans for coping with a severe influenza pandemic, more attention to the issue of appeals processes for pandemic ventilator rationing decisions is needed. Arguments for and against appeals processes are considered, and some suggestions are offered to help efforts at devising more rational pandemic preparedness plans.
Cevidanes, Lucia; Tucker, Scott; Styner, Martin; Kim, Hyungmin; Chapuis, Jonas; Reyes, Mauricio; Proffit, William; Turvey, Timothy; Jaskolka, Michael
2009-01-01
This paper discusses the development of methods for computer-aided jaw surgery. Computer-aided jaw surgery allows us to incorporate the high level of precision necessary for transferring virtual plans into the operating room. We also present a complete computer-aided surgery (CAS) system developed in close collaboration with surgeons. Surgery planning and simulation include construction of 3D surface models from Cone-beam CT (CBCT), dynamic cephalometry, semi-automatic mirroring, interactive cutting of bone and bony segment repositioning. A virtual setup can be used to manufacture positioning splints for intra-operative guidance. The system provides further intra-operative assistance with the help of a computer display showing jaw positions and 3D positioning guides updated in real-time during the surgical procedure. The CAS system aids in dealing with complex cases with benefits for the patient, with surgical practice, and for orthodontic finishing. Advanced software tools for diagnosis and treatment planning allow preparation of detailed operative plans, osteotomy repositioning, bone reconstructions, surgical resident training and assessing the difficulties of the surgical procedures prior to the surgery. CAS has the potential to make the elaboration of the surgical plan a more flexible process, increase the level of detail and accuracy of the plan, yield higher operative precision and control, and enhance documentation of cases. Supported by NIDCR DE017727, and DE018962 PMID:20816308
Planning ATES systems under uncertainty
NASA Astrophysics Data System (ADS)
Jaxa-Rozen, Marc; Kwakkel, Jan; Bloemendal, Martin
2015-04-01
Aquifer Thermal Energy Storage (ATES) can contribute to significant reductions in energy use within the built environment, by providing seasonal energy storage in aquifers for the heating and cooling of buildings. ATES systems have experienced a rapid uptake over the last two decades; however, despite successful experiments at the individual level, the overall performance of ATES systems remains below expectations - largely due to suboptimal practices for the planning and operation of systems in urban areas. The interaction between ATES systems and underground aquifers can be interpreted as a common-pool resource problem, in which thermal imbalances or interference could eventually degrade the storage potential of the subsurface. Current planning approaches for ATES systems thus typically follow the precautionary principle. For instance, the permitting process in the Netherlands is intended to minimize thermal interference between ATES systems. However, as shown in recent studies (Sommer et al., 2015; Bakr et al., 2013), a controlled amount of interference may benefit the collective performance of ATES systems. An overly restrictive approach to permitting is instead likely to create an artificial scarcity of available space, limiting the potential of the technology in urban areas. In response, master plans - which take into account the collective arrangement of multiple systems - have emerged as an increasingly popular alternative. However, permits and master plans both take a static, ex ante view of ATES governance, making it difficult to predict the effect of evolving ATES use or climactic conditions on overall performance. In particular, the adoption of new systems by building operators is likely to be driven by the available subsurface space and by the performance of existing systems; these outcomes are themselves a function of planning parameters. From this perspective, the interactions between planning authorities, ATES operators, and subsurface conditions form a complex adaptive system, for which agent-based modelling provides a useful analysis framework. This study therefore explores the interactions between endogenous ATES adoption processes and the relative performance of different planning schemes, using an agent-based adoption model coupled with a hydrologic model of the subsurface. The models are parameterized to simulate typical operating conditions for ATES systems in a dense urban area. Furthermore, uncertainties relating to planning parameters, adoption processes, and climactic conditions are explicitly considered using exploratory modelling techniques. Results are therefore presented for the performance of different planning policies over a broad range of plausible scenarios.
NASA Astrophysics Data System (ADS)
Aghdasi, Nava; Li, Yangming; Berens, Angelique; Moe, Kris S.; Bly, Randall A.; Hannaford, Blake
2015-03-01
Minimally invasive neuroendoscopic surgery provides an alternative to open craniotomy for many skull base lesions. These techniques provides a great benefit to the patient through shorter ICU stays, decreased post-operative pain and quicker return to baseline function. However, density of critical neurovascular structures at the skull base makes planning for these procedures highly complex. Furthermore, additional surgical portals are often used to improve visualization and instrument access, which adds to the complexity of pre-operative planning. Surgical approach planning is currently limited and typically involves review of 2D axial, coronal, and sagittal CT and MRI images. In addition, skull base surgeons manually change the visualization effect to review all possible approaches to the target lesion and achieve an optimal surgical plan. This cumbersome process relies heavily on surgeon experience and it does not allow for 3D visualization. In this paper, we describe a rapid pre-operative planning system for skull base surgery using the following two novel concepts: importance-based highlight and mobile portal. With this innovation, critical areas in the 3D CT model are highlighted based on segmentation results. Mobile portals allow surgeons to review multiple potential entry portals in real-time with improved visualization of critical structures located inside the pathway. To achieve this we used the following methods: (1) novel bone-only atlases were manually generated, (2) orbits and the center of the skull serve as features to quickly pre-align the patient's scan with the atlas, (3) deformable registration technique was used for fine alignment, (4) surgical importance was assigned to each voxel according to a surgical dictionary, and (5) pre-defined transfer function was applied to the processed data to highlight important structures. The proposed idea was fully implemented as independent planning software and additional data are used for verification and validation. The experimental results show: (1) the proposed methods provided greatly improved planning efficiency while optimal surgical plans were successfully achieved, (2) the proposed methods successfully highlighted important structures and facilitated planning, (3) the proposed methods require shorter processing time than classical segmentation algorithms, and (4) these methods can be used to improve surgical safety for surgical robots.
ERIC Educational Resources Information Center
Day, C. William
1999-01-01
Examines the planning process to identify equipment or systems within an educational facility that could be Y2K sensitive. Discusses developing a contingency plan to prevent operational shutdown. Concluding comments describe a simple Y2K equipment-testing procedure. (GR)
The application of automated operations at the Institutional Processing Center
NASA Technical Reports Server (NTRS)
Barr, Thomas H.
1993-01-01
The JPL Institutional and Mission Computing Division, Communications, Computing and Network Services Section, with its mission contractor, OAO Corporation, have for some time been applying automation to the operation of JPL's Information Processing Center (IPC). Automation does not come in one easy to use package. Automation for a data processing center is made up of many different software and hardware products supported by trained personnel. The IPC automation effort formally began with console automation, and has since spiraled out to include production scheduling, data entry, report distribution, online reporting, failure reporting and resolution, documentation, library storage, and operator and user education, while requiring the interaction of multi-vendor and locally developed software. To begin the process, automation goals are determined. Then a team including operations personnel is formed to research and evaluate available options. By acquiring knowledge of current products and those in development, taking an active role in industry organizations, and learning of other data center's experiences, a forecast can be developed as to what direction technology is moving. With IPC management's approval, an implementation plan is developed and resources identified to test or implement new systems. As an example, IPC's new automated data entry system was researched by Data Entry, Production Control, and Advance Planning personnel. A proposal was then submitted to management for review. A determination to implement the new system was made and elements/personnel involved with the initial planning performed the implementation. The final steps of the implementation were educating data entry personnel in the areas effected and procedural changes necessary to the successful operation of the new system.
Medical imaging and registration in computer assisted surgery.
Simon, D A; Lavallée, S
1998-09-01
Imaging, sensing, and computing technologies that are being introduced to aid in the planning and execution of surgical procedures are providing orthopaedic surgeons with a powerful new set of tools for improving clinical accuracy, reliability, and patient outcomes while reducing costs and operating times. Current computer assisted surgery systems typically include a measurement process for collecting patient specific medical data, a decision making process for generating a surgical plan, a registration process for aligning the surgical plan to the patient, and an action process for accurately achieving the goals specified in the plan. Some of the key concepts in computer assisted surgery applied to orthopaedics with a focus on the basic framework and underlying technologies is outlined. In addition, technical challenges and future trends in the field are discussed.
Strategic management system in a healthcare setting--moving from strategy to results.
Devitt, Rob; Klassen, Wolf; Martalog, Julian
2005-01-01
One of the historical challenges in the healthcare system has been the identification and collection of meaningful data to measure an organization's progress towards the achievement of its strategic goals and the concurrent alignment of internal operating practices with this strategy. Over the last 18 months the Toronto East General Hospital (TEGH) has adopted a strategic management system and organizing framework that has led to a metric-based strategic plan. It has allowed for formal and measurable linkages across a full range of internal business processes, from the annual operating plan to resource allocation decisions, to the balanced scorecard and individual performance evaluations. The Strategic Management System (SMS) aligns organizational planning and performance measurement, facilitates an appropriate balance between organizational priorities and resolving "local" problems, and encourages behaviours that are consistent with the values upon which the organization is built. The TEGH Accountability Framework serves as the foundation for the entire system. A key tool of the system is the rolling three-year strategic plan for the organization that sets out specific annual improvement targets on a number of key strategic measures. Individual program/department plans with corresponding measures ensure that the entire organization is moving forward strategically. Each year, all plans are reviewed, with course adjustments made to reflect changes in the hospital's environment and with re-calibration of performance targets for the next three years to ensure continued improvement and organizational progress. This system has been used through one annual business cycle. Results from the past year show measurable success. The hospital has improved on 12 of the 15 strategic plan metrics, including achieving the targeted 1% operating surplus while operating in an environment of tremendous change and uncertainty. This article describes the strategic management system used at TEGH and demonstrates the formal integration of the plan into its operating and decision making processes. It also provides examples of the metrics, their use in decision-making and the variance reporting and improvement mechanisms. The article also demonstrates that a measurement-oriented approach to the planning and delivery of community hospital service is both achievable and valuable in terms of accountability and organizational responsiveness.
A New Vision for Integrated Breast Care.
1999-09-01
management with recommendations for strategic information systems use and overall process improvements. " Wrote the business plan for a physician group... business and marketing plans for physician network expansion. Performed market research and internal operational and strategic analyses. Identified...Berkeley Master of Business Administration (MBA) May 1994 • Concentration: Marketing and Strategic Planning * Event Chairman, MBA Challenge for Charity
Space Station Freedom operations planning
NASA Technical Reports Server (NTRS)
Smith, Kevin J.
1988-01-01
This paper addresses the development of new planning methodologies which will evolve to serve the Space Station Freedom program; these planning processes will focus on the complex task of effectively managing the resources provided by the Space Station Freedom and will be made available to the diverse international community of space station users in support of their ongoing investigative activities.
MO-B-BRB-01: Optimize Treatment Planning Process in Clinical Environment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Feng, W.
The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequentialmore » events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.« less
MO-B-BRB-00: Optimizing the Treatment Planning Process
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequentialmore » events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kapur, A.
The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequentialmore » events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.« less
Service Oriented Architecture for Coast Guard Command and Control
2007-03-01
Operations BPEL4WS The Business Process Execution Language for Web Services BPMN Business Process Modeling Notation CASP Computer Aided Search Planning...Business Process Modeling Notation ( BPMN ) provides a standardized graphical notation for drawing business processes in a workflow. Software tools
Hospital renovation projects: phased construction requires planning at its best.
Cox, J C
1986-01-01
Building a new hospital facility is a difficult task, but adding onto and renovating an existing structure while normal activity continues is even more difficult. Project planners, designers, contractors, and hospital managers must carefully program the joint effort of construction and hospital operation. Several factors in the construction process and potential problems for hospital operations are described to help hospital managers better anticipate difficulties before plans are finalized and construction commences.
An Overview of ANN Application in the Power Industry
NASA Technical Reports Server (NTRS)
Niebur, D.
1995-01-01
The paper presents a survey on the development and experience with artificial neural net (ANN) applications for electric power systems, with emphasis on operational systems. The organization and constraints of electric utilities are reviewed, motivations for investigating ANN are identified, and a current assessment is given from the experience of 2400 projects using ANN for load forecasting, alarm processing, fault detection, component fault diagnosis, static and dynamic security analysis, system planning, and operation planning.
Automatic Data Processing Equipment (ADPE) acquisition plan for the medical sciences
NASA Technical Reports Server (NTRS)
1979-01-01
An effective mechanism for meeting the SLSD/MSD data handling/processing requirements for Shuttle is discussed. The ability to meet these requirements depends upon the availability of a general purpose high speed digital computer system. This system is expected to implement those data base management and processing functions required across all SLSD/MSD programs during training, laboratory operations/analysis, simulations, mission operations, and post mission analysis/reporting.
Analysis and Development of a Web-Enabled Planning and Scheduling Database Application
2013-09-01
establishes an entity—relationship diagram for the desired process, constructs an operable database using MySQL , and provides a web- enabled interface for...development, develop, design, process, re- engineering, reengineering, MySQL , structured query language, SQL, myPHPadmin. 15. NUMBER OF PAGES 107 16...relationship diagram for the desired process, constructs an operable database using MySQL , and provides a web-enabled interface for the population of
Army Design Methodology: Commander’s Resource
2012-02-01
Contracting Officer’s Representative and Subject Matter POC: Heather Wolters 14. ABSTRACT With the March 2010 publication of FM 5-0, The Operations...Process, the U.S. Army formally introduced Design into its doctrine (Headquarters; Department of the Army, 2010 ). Design is defined in FM 5-0 as ?a...traditional approach to operational planning. In March 2010 in FM 5-0: The Operations Process, the Army incorporated the concept of Design1 into doctrine
Implementing Information Assurance - Beyond Process
2009-01-01
disabled or properly configured. Tools and scripts are available to expedite the configuration process on some platforms, For example, approved Windows...in the System Security Plan (SSP) or Information Security Plan (lSP). Any PPSs not required for operation by the system must be disabled , This...Services must be disabled , Implementing an 1M capability within the boundary carries many policy and documentation requirements. Usemame and passwords
Total Quality Management Implementation Plan: Defense Depot, Ogden
1989-07-01
NUMBERS Total Quality Management Implementation Plan Defense Depot Ogden 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING...PAGES TQM (Total Quality Management ), Continuous Process Improvement, Depot Operations, Process Action Teams 16. PRICE CODE 17. SECURITY...034 A Message From The Commander On Total Quality Management i fully support the DLA aoproacii to Total Quality Management . As stated by General
Turnaround Operations Analysis for OTV. Volume 3: Technology Development Plan
NASA Technical Reports Server (NTRS)
1988-01-01
An integrated technology development plan for the technologies required to process both GBOTVs and SBOTVs are described. The plan includes definition of the tests and experiments to be accomplished on the ground, in a Space Shuttle Sortie Mission, on an Expendable Launch Vehicle, or at the Space Station as a Technology Development Mission (TDM). The plan reflects and accommodates current and projected research and technology programs where appropriate.
Research and development plan for the Slagging Pyrolysis Incinerator. [For TRU waste
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hedahl, T.G.; McCormack, M.D.
1979-01-01
Objective is to develop an incinerator for processing disposed transuranium waste. This R and D plan describes the R and D efforts required to begin conceptual design of the Slagging Pyrolysis Incinerator (Andco-Torrax). The program includes: incinerator, off-gas treatment, waste handling, instrumentation, immobilization analyses, migration studies, regulations, Belgium R and D test plan, Disney World test plan, and remote operation and maintenance. (DLC)
Systemic Operational Design: Enhancing the Joint Operation Planning Process
2007-05-20
Epistemological Bumpf of the Way Ahead for Operational Design? p. 42. 79 Stephen R. Covey, The 7 Habits of Highly Effective People . (New York: Fireside...John Wiley and Sons, Ltd. Covey, Stephen R. 1989. The 7 Habits of Highly Effective People . New York: Fireside Publishing. Creveld, Martin Van
MO-B-BRB-02: Maintain the Quality of Treatment Planning for Time-Constraint Cases
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chang, J.
The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequentialmore » events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.« less
2012-03-01
Targeting Review Board OPLAN Operations Plan OPORD Operations Order OPSIT Operational Situation OSINT Open Source Intelligence OV...Analysis Evaluate FLTREPs MISREPs Unit Assign Assets Feedback Asset Shortfalls Multi-Int Collection Political & Embasy Law Enforcement HUMINT OSINT ...Embassy Information OSINT Manage Theater HUMINT Law Enforcement Collection Sort Requests Platform Information Agency Information M-I Collect
NASA Technical Reports Server (NTRS)
Yang, Genevie Velarde; Mohr, David; Kirby, Charles E.
2008-01-01
To keep Cassini on its complex trajectory, more than 200 orbit trim maneuvers (OTMs) have been planned from July 2004 to July 2010. With only a few days between many of these OTMs, the operations process of planning and executing the necessary commands had to be automated. The resulting Maneuver Automation Software (MAS) process minimizes the workforce required for, and maximizes the efficiency of, the maneuver design and uplink activities. The MAS process is a well-organized and logically constructed interface between Cassini's Navigation (NAV), Spacecraft Operations (SCO), and Ground Software teams. Upon delivery of an orbit determination (OD) from NAV, the MAS process can generate a maneuver design and all related uplink and verification products within 30 minutes. To date, all 112 OTMs executed by the Cassini spacecraft have been successful. MAS was even used to successfully design and execute a maneuver while the spacecraft was in safe mode.
Status report on the land processes aircraft science management operations working group
NASA Technical Reports Server (NTRS)
Lawless, James G.; Mann, Lisa J.
1991-01-01
Since its inception three years ago, the Land Processes Aircraft Science Management Operations Working Group (MOWG) provided recommendations on the optimal use of the Agency's aircraft in support of the Land Processes Science Program. Recommendations covered topics such as aircraft and sensor usage, development of long-range plans, Multisensor Airborne Campaigns (MAC), program balance, aircraft sensor databases, new technology and sensor development, and increased University scientist participation in the program. Impacts of these recommendations improved the efficiency of various procedures including the flight request process, tracking of flight hours, and aircraft usage. The group also created a bibliography focused on publications produced by Land Processes scientists from the use of the aircraft program, surveyed NASA funded PI's on their participation in the aircraft program, and developed a planning template for multi-sensor airborne campaigns. Benefits from these activities are summarized.
NASA Technical Reports Server (NTRS)
1971-01-01
A comprehensive test plan for determining the hazards associated with pyrotechnic manufacturing processes is presented. The rationale for each test is based on a systematic analysis of historical accounts of accidents and a detailed study of the characteristics of each manufacturing process. The most hazardous manufacturing operations have been determined to be pressing, mixing, reaming, and filling. The hazard potential of a given situation is evaluated in terms of the probabilities of initiation, communication, and transition to detonation (ICT). The characteristics which affect the ICT probabilities include the ignition mechanisms which are present either in normal or abnormal operation, the condition and properties of the pyrotechnic material, and the configuration of the processing equipment. Analytic expressions are derived which describe the physical conditions of the system, thus permitting a variety of processes to be evaluated in terms of a small number of experiments.
Converting CSV Files to RKSML Files
NASA Technical Reports Server (NTRS)
Trebi-Ollennu, Ashitey; Liebersbach, Robert
2009-01-01
A computer program converts, into a format suitable for processing on Earth, files of downlinked telemetric data pertaining to the operation of the Instrument Deployment Device (IDD), which is a robot arm on either of the Mars Explorer Rovers (MERs). The raw downlinked data files are in comma-separated- value (CSV) format. The present program converts the files into Rover Kinematics State Markup Language (RKSML), which is an Extensible Markup Language (XML) format that facilitates representation of operations of the IDD and enables analysis of the operations by means of the Rover Sequencing Validation Program (RSVP), which is used to build sequences of commanded operations for the MERs. After conversion by means of the present program, the downlinked data can be processed by RSVP, enabling the MER downlink operations team to play back the actual IDD activity represented by the telemetric data against the planned IDD activity. Thus, the present program enhances the diagnosis of anomalies that manifest themselves as differences between actual and planned IDD activities.
NASA Astrophysics Data System (ADS)
Dolotovskii, I. V.; Dolotovskaya, N. V.; Larin, E. A.
2018-05-01
The article presents the architecture and content of a specialized analytical system for monitoring operational conditions, planning of consumption and generation of energy resources, long-term planning of production activities and development of a strategy for the development of the energy complex of gas processing enterprises. A compositional model of structured data on the equipment of the main systems of the power complex is proposed. The correctness of the use of software modules and the database of the analytical system is confirmed by comparing the results of measurements on the equipment of the electric power system and simulation at the operating gas processing plant. A high accuracy in the planning of consumption of fuel and energy resources has been achieved (the error does not exceed 1%). Information and program modules of the analytical system allow us to develop a strategy for improving the energy complex in the face of changing technological topology and partial uncertainty of economic factors.
Decision support systems and the healthcare strategic planning process: a case study.
Lundquist, D L; Norris, R M
1991-01-01
The repertoire of applications that comprises health-care decision support systems (DSS) includes analyses of clinical, financial, and operational activities. As a whole, these applications facilitate developing comprehensive and interrelated business and medical models that support the complex decisions required to successfully manage today's health-care organizations. Kennestone Regional Health Care System's use of DSS to facilitate strategic planning has precipitated marked changes in the organization's method of determining capital allocations. This case study discusses Kennestone's use of DSS in the strategic planning process, including profiles of key DSS modeling components.
Planning of reach-and-grasp movements: effects of validity and type of object information
NASA Technical Reports Server (NTRS)
Loukopoulos, L. D.; Engelbrecht, S. F.; Berthier, N. E.
2001-01-01
Individuals are assumed to plan reach-and-grasp movements by using two separate processes. In 1 of the processes, extrinsic (direction, distance) object information is used in planning the movement of the arm that transports the hand to the target location (transport planning); whereas in the other, intrinsic (shape) object information is used in planning the preshaping of the hand and the grasping of the target object (manipulation planning). In 2 experiments, the authors used primes to provide information to participants (N = 5, Experiment 1; N = 6, Experiment 2) about extrinsic and intrinsic object properties. The validity of the prime information was systematically varied. The primes were succeeded by a cue, which always correctly identified the location and shape of the target object. Reaction times were recorded. Four models of transport and manipulation planning were tested. The only model that was consistent with the data was 1 in which arm transport and object manipulation planning were postulated to be independent processes that operate partially in parallel. The authors suggest that the processes involved in motor planning before execution are primarily concerned with the geometric aspects of the upcoming movement but not with the temporal details of its execution.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-02
... Emissions From Industrial Process Operations New Castle County.'' 12. Regulation 1112 ``Control of Nitrogen... the State Implementation Plans.'' 25. Regulation 1139 ``Nitrogen Oxides (NO X ) Budget Trading Program... by reference, Intergovernmental relations, Lead, Nitrogen dioxide, Ozone, Particulate matter...
STS/Spacelab payload utilization planning study: Executive summary
NASA Technical Reports Server (NTRS)
1976-01-01
The planning process recommended to meet the orbital flight requirements for the Space Transportation System and payload development, procurement, operations, and support leading to authorization and funding of STS and payload project activities is described. The rationale and rp primary products of STS utilization planning are summarized along with the implementation of the system. Major recommendations of the study are included.
Reeder, Blaine; Turner, Anne; Demiris, George
2010-01-01
Continuity of operations planning focuses on an organization's ability to deliver essential services before, during and after an emergency. Public health leaders must make decisions based on information from many sources and their information needs are often facilitated or hindered by technology. The aim of this study is to provide a systematic review of studies of technology projects that address public health continuity of operations planning information needs and to discuss patterns, themes, and challenges to inform the design of public health continuity of operations information systems. To return a comprehensive results set in an under-explored area, we searched broadly in the Medline and EBSCOHost bibliographic databases using terms from prior work in public health emergency management and continuity of operations planning in other domains. In addition, we manually searched the citation lists of publications included for review. A total of 320 publications were reviewed. Twenty studies were identified for inclusion (twelve risk assessment decision support tools, six network and communications-enabled decision support tools, one training tool and one dedicated video-conferencing tool). Levels of implementation for information systems in the included studies range from proposed frameworks to operational systems. There is a general lack of documented efforts in the scientific literature for technology projects about public health continuity of operations planning. Available information about operational information systems suggest inclusion of public health practitioners in the design process as a factor in system success.
Ground data systems resource allocation process
NASA Technical Reports Server (NTRS)
Berner, Carol A.; Durham, Ralph; Reilly, Norman B.
1989-01-01
The Ground Data Systems Resource Allocation Process at the Jet Propulsion Laboratory provides medium- and long-range planning for the use of Deep Space Network and Mission Control and Computing Center resources in support of NASA's deep space missions and Earth-based science. Resources consist of radio antenna complexes and associated data processing and control computer networks. A semi-automated system was developed that allows operations personnel to interactively generate, edit, and revise allocation plans spanning periods of up to ten years (as opposed to only two or three weeks under the manual system) based on the relative merit of mission events. It also enhances scientific data return. A software system known as the Resource Allocation and Planning Helper (RALPH) merges the conventional methods of operations research, rule-based knowledge engineering, and advanced data base structures. RALPH employs a generic, highly modular architecture capable of solving a wide variety of scheduling and resource sequencing problems. The rule-based RALPH system has saved significant labor in resource allocation. Its successful use affirms the importance of establishing and applying event priorities based on scientific merit, and the benefit of continuity in planning provided by knowledge-based engineering. The RALPH system exhibits a strong potential for minimizing development cycles of resource and payload planning systems throughout NASA and the private sector.
2015-04-01
MICAP Mission Impaired Capability Awaiting Parts OSD Office of the Secretary of Defense S & OP Sales and Operations Planning This is a work of...January 2013, the Army began to implement a Sales and Operations Planning ( S & OP ) process to improve its supply chain and inventory management...According to the Army Materiel Command officials, the Army’s decision to implement S & OP was recommended by an Integrated Project Team that concluded the
Karibo, J
1994-05-01
Bon Secours Health System's new strategic plan and community benefit services policy integrates the planning, budgeting, evaluating, and reporting of community benefit services into management processes at the same level of authority as other operational activities. The strategic plan of Bon Secours Health System, headquartered in Marriottsville, MD, documents the system's mission, operating principles, vision, and five goals, one of which is to improve the communities' health status. The community benefit services operating policy requires that the Bon Secours Health System chief executive officer (CEO) and each local system CEO and nursing home administrator form a multidisciplinary local work group to be responsible for community benefit services. Each local work group assesses the needs of its community within the framework of the annual planning process. Determining what services are needed and how to deliver them is relatively easy. The difficult task is determining which of the many needs to address. What a community lacks may be the result of poor or inadequate public policy. For example, its priority may not be healthcare. In these situations healthcare providers may be best able to serve the community by providing indirect support to social service providers or by advocating for change. The community benefit services operating policy provides a standard approach to match the community's priority needs with the institution's resources and produce a measurable improvement in health status.
Interactive orbital proximity operations planning system
NASA Technical Reports Server (NTRS)
Grunwald, Arthur J.; Ellis, Stephen R.
1990-01-01
An interactive graphical planning system for on-site planning of proximity operations in the congested multispacecraft environment about the space station is presented. The system shows the astronaut a bird's eye perspective of the space station, the orbital plane, and the co-orbiting spacecraft. The system operates in two operational modes: (1) a viewpoint mode, in which the astronaut is able to move the viewpoint around in the orbital plane to range in on areas of interest; and (2) a trajectory design mode, in which the trajectory is planned. Trajectory design involves the composition of a set of waypoints which result in a fuel-optimal trajectory which satisfies all operational constraints, such as departure and arrival constraints, plume impingement constraints, and structural constraints. The main purpose of the system is to present the trajectory and the constraints in an easily interpretable graphical format. Through a graphical interactive process, the trajectory waypoints are edited until all operational constraints are satisfied. A series of experiments was conducted to evaluate the system. Eight airline pilots with no prior background in orbital mechanics participated in the experiments. Subject training included a stand-alone training session of about 6 hours duration, in which the subjects became familiar with orbital mechanics concepts and performed a series of exercises to familiarize themselves with the control and display features of the system. They then carried out a series of production runs in which 90 different trajectory design situations were randomly addressed. The purpose of these experiments was to investigate how the planning time, planning efforts, and fuel expenditures were affected by the planning difficulty. Some results of these experiments are presented.
NASA Technical Reports Server (NTRS)
Chien, Steve A.; McLaren, David A.; Rabideau, Gregg R.; Mandl, Daniel; Hengemihle, Jerry
2013-01-01
A set of automated planning algorithms is the current operations baseline approach for the Intelligent Payload Module (IPM) of the proposed Hyper spectral Infrared Imager (HyspIRI) mission. For this operations concept, there are only local (e.g. non-depletable) operations constraints, such as real-time downlink and onboard memory, and the forward sweeping algorithm is optimal for determining which science products should be generated onboard and on ground based on geographical overflights, science priorities, alerts, requests, and onboard and ground processing constraints. This automated planning approach was developed for the HyspIRI IPM concept. The HyspIRI IPM is proposed to use an X-band Direct Broadcast (DB) capability that would enable data to be delivered to ground stations virtually as it is acquired. However, the HyspIRI VSWIR and TIR instruments will produce approximately 1 Gbps data, while the DB capability is 15 Mbps for a approx. =60X oversubscription. In order to address this mismatch, this innovation determines which data to downlink based on both the type of surface the spacecraft is overflying, and the onboard processing of data to detect events. For example, when the spacecraft is overflying Polar Regions, it might downlink a snow/ice product. Additionally, the onboard software will search for thermal signatures indicative of a volcanic event or wild fire and downlink summary information (extent, spectra) when detected, thereby reducing data volume. The planning system described above automatically generated the IPM mission plan based on requested products, the overflight regions, and available resources.
Kraus, T W; Weber, W; Mieth, M; Funk, H; Klar, E; Herfarth, C
2000-03-01
Surgical hospitals can be seen as operational or even industrial production systems. Doctors have a major impact on both medical performance and costs. For active participation in the management process, knowledge of industrial controlling mechanisms is required. German hospitals currently receive no procedure-related financial revenues, such as prices or tariffs for defined medical treatment activities. Maximum clinical revenues are, furthermore, limited by principles of planned economy and can be increased only slightly by greater medical performance. Costs are the only target that can be autonomously influenced by the management. Operative controlling in hospitals aims at horizontal and vertical coordination of subunits and decentralization of process regulations. Hospital medical performance is not clearly defined, its quantitative measurement very problematic. Process-orientated clinical activities are not taken into account. A high percentage of hospital costs are fixed and can be influenced only by major structural interventions in the long term. Variable costs are primarily dependent on the quantity of clinical activities, but also heavily influenced by patient structure (comorbidity and risk profile). The various forms of industrial cost calculations, such as internal budgeting, internal markets or flexible plan-cost balancing, cannot be directly applied in hospital management. Based on these analyses, current operational concepts and strategic trends are listed to describe cost-management options in hospitals with focus on the German health reforms.
The Process of Sensemaking in Complex Human Endeavors
2008-06-01
encompassing Joint, Interagency, and Multinational capabilities. The Art and Science of Battle Command LeadUnderstand CDR / Staff ART / Science In short, we...operations. Staff Running Estimates t ff i i Visualize CDR / Staff ART / Science •Planning guidance •Planning guidance •Cdr ’s Intent Describe CDR...Staff ART / Science •Plans & Orders •Preparation •Plans & Orders •Preparation •Execution WF • Intelligence •Maneuver •Fire Support • Protection
Pacific Northwest National Laboratory institutional plan: FY 1996--2001
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-01-01
This report contains the operation and direction plan for the Pacific Northwest National Laboratory of the US Department of Energy. The topics of the plan include the laboratory mission and core competencies, the laboratory strategic plan; the laboratory initiatives in molecular sciences, microbial biotechnology, global environmental change, complex modeling of physical systems, advanced processing technology, energy technology development, and medical technologies and systems; core business areas, critical success factors, and resource projections.
Planning Bepicolombo MPO Science Operations to study Mercury Interior
NASA Astrophysics Data System (ADS)
De La Fuente, Sara; Carasa, Angela; Ortiz, Iñaki; Rodriguez, Pedro; Casale, Mauro; Benkhoff, Johannes; Zender, Joe
2017-04-01
BepiColombo is an Interdisciplinary Cornerstone ESA-JAXA Mission to Mercury, with two orbiters, the ESA Mercury Planetary Orbiter (MPO) and the JAXA Mercury Magnetospheric Orbiter (MMO) dedicated to study of the planet and its magnetosphere. The MPO, is a three-axis-stabilized, nadir-pointing spacecraft which will be placed in a polar orbit, providing excellent spatial resolution over the entire planet surface. The MPO's scientific payload comprises 11 instrument packages, including laser altimeter, cameras and the radio science experiment that will be dedicated to the study of Mercury's interior: structure, composition, formation and evolution. The planning of the science operations to be carried out by the Mercury's interior scientific instruments will be done by the SGS located at the European Space Astronomy Centre (ESAC), in conjunction with the scientific instrument teams. The process will always consider the complete nominal mission duration, such that the contribution of the scheduled science operations to the science objectives, the total data volume generated, and the seasonal interdependency, can be tracked. The heart of the science operations planning process is the Observations Catalogue (OC), a web-accessed database to collect and analyse all science operations requests. From the OC, the SGS will first determine all science opportunity windows compatible with the spacecraft operational constraints. Secondly, only those compatible with the resources (power and data volume) and pointing constraints will be chosen, including slew feasibility.
Automation of Cassini Support Imaging Uplink Command Development
NASA Technical Reports Server (NTRS)
Ly-Hollins, Lisa; Breneman, Herbert H.; Brooks, Robert
2010-01-01
"Support imaging" is imagery requested by other Cassini science teams to aid in the interpretation of their data. The generation of the spacecraft command sequences for these images is performed by the Cassini Instrument Operations Team. The process initially established for doing this was very labor-intensive, tedious and prone to human error. Team management recognized this process as one that could easily benefit from automation. Team members were tasked to document the existing manual process, develop a plan and strategy to automate the process, implement the plan and strategy, test and validate the new automated process, and deliver the new software tools and documentation to Flight Operations for use during the Cassini extended mission. In addition to the goals of higher efficiency and lower risk in the processing of support imaging requests, an effort was made to maximize adaptability of the process to accommodate uplink procedure changes and the potential addition of new capabilities outside the scope of the initial effort.
Fall of the Integrated Planning System
2012-05-17
operations planning processes. Any service planner can lead the implementation of JOPP because he is familiar with the process and the products . The...discontinued the use of IPS. One can ask, why was IPS withdrawn so soon after its implementation ? This monograph explores the reasons behind the short...IPS raises the question, why was IPS withdrawn so soon after its implementation . This monograph explores the reasons behind the short lifespan of the
NASA Technical Reports Server (NTRS)
Johnson, David W.
1991-01-01
The purpose was to study how manpower and projects are planned at the Facilities Engineering Division (FENGD) within the Systems Engineering and Operations Directorate of the LaRC and to make recommendations for improving the effectiveness and productivity ot the tools that are used. The existing manpower and project planning processes (including the management plan for the FENGD, existing manpower planning reports, project reporting to LaRC and NASA Headquarters, employee time reporting, financial reporting, and coordination/tracking reports for procurement) were discussed with several people, and project planning software was evaluated.
Video Information Communication and Retrieval/Image Based Information System (VICAR/IBIS)
NASA Technical Reports Server (NTRS)
Wherry, D. B.
1981-01-01
The acquisition, operation, and planning stages of installing a VICAR/IBIS system are described. The system operates in an IBM mainframe environment, and provides image processing of raster data. System support problems with software and documentation are discussed.
Impacts Assessment of Integrated Dynamic Transit Operations: Evaluation Plan and Addendum
DOT National Transportation Integrated Search
2016-04-01
This document details the process that the Volpe Center intended to follow in evaluating the impacts of the Integrated Dynamic Transit Operations (IDTO) prototype demonstration in Columbus, Ohio and Central Florida. The document also includes the add...
Impact Assessment of Integrated Dynamic Transit Operations Evaluation Plan and Addendum.
DOT National Transportation Integrated Search
2016-01-04
This document details the process that the Volpe Center intended to follow in evaluating the impacts of the Integrated Dynamic Transit Operations (IDTO) prototype demonstration in Columbus, Ohio and Central Florida. The document also includes the add...
DOT National Transportation Integrated Search
1997-09-01
The United States Department of Transportations (USDOTs) National ITS Program : Plan describes the national strategy for deploying advanced technologies and services into our : transportation system. To emphasize the need-driven (rather than te...
NASA Technical Reports Server (NTRS)
1970-01-01
The application of a carbon dioxide laser for optical communication with ATS satellites is discussed. The following elements of the laser communication equipment are reported: (1) operational ground equipment, (2) data acquisition plan, and (3) data processing, reduction, and analysis plan.
Information Systems for University Planning.
ERIC Educational Resources Information Center
Robinson, Robert J.
This paper proposes construction of a separate data base environment for university planning information, distinct from data bases and systems supporting operational functioning and management. The data base would receive some of its input from the management information systems (MIS)/transactional data bases and systems through a process of…
NASA Technical Reports Server (NTRS)
Equils, Douglas J.
2008-01-01
Launched on October 15, 1997, the Cassini-Huygens spacecraft began its ambitious journey to the Saturnian system with a complex suite of 12 scientific instruments, and another 6 instruments aboard the European Space Agencies Huygens Probe. Over the next 6 1/2 years, Cassini would continue its relatively simplistic cruise phase operations, flying past Venus, Earth, and Jupiter. However, following Saturn Orbit Insertion (SOI), Cassini would become involved in a complex series of tasks that required detailed resource management, distributed operations collaboration, and a data base for capturing science objectives. Collectively, these needs were met through a web-based software tool designed to help with the Cassini uplink process and ultimately used to generate more robust sequences for spacecraft operations. In 2001, in conjunction with the Southwest Research Institute (SwRI) and later Venustar Software and Engineering Inc., the Cassini Information Management System (CIMS) was released which enabled the Cassini spacecraft and science planning teams to perform complex information management and team collaboration between scientists and engineers in 17 countries. Originally tailored to help manage the science planning uplink process, CIMS has been actively evolving since its inception to meet the changing and growing needs of the Cassini uplink team and effectively reduce mission risk through a series of resource management validation algorithms. These algorithms have been implemented in the web-based software tool to identify potential sequence conflicts early in the science planning process. CIMS mitigates these sequence conflicts through identification of timing incongruities, pointing inconsistencies, flight rule violations, data volume issues, and by assisting in Deep Space Network (DSN) coverage analysis. In preparation for extended mission operations, CIMS has also evolved further to assist in the planning and coordination of the dual playback redundancy of highvalue data from targets such as Titan and Enceladus. This paper will outline the critical role that CIMS has played for Cassini in the distributed ops paradigm throughout operations. This paper will also examine the evolution that CIMS has undergone in the face of new science discoveries and fluctuating operational needs. And finally, this paper will conclude with theoretical adaptation of CIMS for other projects and the potential savings in cost and risk reduction that could potentially be tapped into by future missions.
Mono-stereo-autostereo: the evolution of 3-dimensional neurosurgical planning.
Stadie, Axel T; Kockro, Ralf A
2013-01-01
In the past decade, surgery planning has changed significantly. The main reason is the improvements in computer graphical rendering power and display technology, which turned the plain graphics of the mid-1990s into interactive stereoscopic objects. To report our experiences with 2 virtual reality systems used for planning neurosurgical operations. A series of 208 operations were planned with the Dextroscope (Bracco AMT, Singapore) requiring the use of liquid crystal display shutter glasses. The participating neurosurgeons answered a questionnaire after the planning procedure and postoperatively. In a second prospective series of 33 patients, we used an autostereoscopic monitor system (MD20-3-D; Setred SA, Sweden) to plan intracranial operations. A questionnaire regarding the value of surgery planning was answered preoperatively and postoperatively. The Dextroscope could be integrated into daily surgical routine. Surgeons regarded their understanding of the pathoanatomical situation as improved, leading to enhanced intraoperative orientation and confidence compared with conventional planning. The autostereoscopic Setred system was regarded as helpful in establishing the surgical strategy and analyzing the pathoanatomical situation compared with conventional planning. Both systems were perceived as a backup in case of failure of the standard navigation system. Improvement of display and interaction techniques adds to the realism of the planning process and enables precise structural understanding preoperatively. This minimizes intraoperative guesswork and exploratory dissection. Autostereoscopic display techniques will further increase the value and acceptance of 3-dimensional planning and intraoperative navigation.
Workshop proceedings: Information Systems for Space Astrophysics in the 21st Century, volume 1
NASA Technical Reports Server (NTRS)
Cutts, James (Editor); Ng, Edward (Editor)
1991-01-01
The Astrophysical Information Systems Workshop was one of the three Integrated Technology Planning workshops. Its objectives were to develop an understanding of future mission requirements for information systems, the potential role of technology in meeting these requirements, and the areas in which NASA investment might have the greatest impact. Workshop participants were briefed on the astrophysical mission set with an emphasis on those missions that drive information systems technology, the existing NASA space-science operations infrastructure, and the ongoing and planned NASA information systems technology programs. Program plans and recommendations were prepared in five technical areas: Mission Planning and Operations; Space-Borne Data Processing; Space-to-Earth Communications; Science Data Systems; and Data Analysis, Integration, and Visualization.
Gellert, Paul; Ziegelmann, Jochen P; Lippke, Sonia; Schwarzer, Ralf
2012-04-01
Limitations in perceived lifetime can undermine long-term goal striving. Planning is supposed to translate intentions into health behaviors and to operate as a compensatory strategy to overcome goal striving deficits associated with a limited time perspective. Two longitudinal studies were conducted examining the compensatory role of planning: an online survey on fruit and vegetable consumption (N = 909; 16-78 years; follow-up at 4 months) and a questionnaire study on physical exercise in older adults (N = 289; 60-95 years, over a half-year period). Intentions, planning, and behavior were measured in a behavior-specific, future time perspective in a generic manner. Planning mediated between intentions and both health behaviors. Time perspective operated as a moderator, indicating that in individuals with a more limited time perspective, a stronger effect of planning on health behaviors emerged. Planning as a self-regulatory strategy may compensate for a limited time perspective.
2014-05-01
There are two principal directions that disaster studies pursue: (1) interventional; and (2) noninterventional. Interventional studies are used to evaluate specific responses as to their effectiveness in meeting their respective objectives, their contribution to the overarching goal, the efficiency with which they are able to achieve their objectives, other effects created, and their respective costs. On the other hand, noninterventional studies examine the epidemiology of disasters and for the most part are observational. Both interventional and noninterventional studies require data/information obtained from assessments. This section of these Guidelines examines the operational framework used to study interventions/responses and includes the following processes: (1) assessments, (2) identification of needs; (3) strategic planning; (4) selection of intervention(s); (5) operational planning; (6) execution of interventions; and (7) monitoring and evaluation of effects and changes in levels of functions resulting from the intervention(s) being studied.
2014-04-10
CAPE CANAVERAL, Fla. -- At the Kennedy Space Center in Florida, Trey Carlson, the spaceport's master planner, describes how the Center Planning and Development Directorate CPD is working to help transform Kennedy into a multi-user spaceport through partnerships and resource planning. The event was first of what is planned to be quarterly meetings between NASA's industry partners and representatives of Kennedy's CPD, Safety and Mission Assurance, International Space Station Ground Processing, Chief Financial officer and Ground Processing and Ground Systems Development and Operations directorates. Center Planning and Development is the “front door” for partnerships with NASA’s Kennedy Space Center. Kennedy is now developing the world’s premier spaceport for government and commercial space industries using comprehensive resource planning and partnerships. Photo credit: NASA/Daniel Casper
2014-04-10
CAPE CANAVERAL, Fla. -- At the Kennedy Space Center in Florida, Trey Carlson, the spaceport's master planner, describes how the Center Planning and Development Directorate CPD is working to help transform Kennedy into a multi-user spaceport through partnerships and resource planning. The event was first of what is planned to be quarterly meetings between NASA's industry partners and representatives of Kennedy's CPD, Safety and Mission Assurance, International Space Station Ground Processing, Chief Financial officer and Ground Processing and Ground Systems Development and Operations directorates. Center Planning and Development is the “front door” for partnerships with NASA’s Kennedy Space Center. Kennedy is now developing the world’s premier spaceport for government and commercial space industries using comprehensive resource planning and partnerships. Photo credit: NASA/Daniel Casper
NASA Astrophysics Data System (ADS)
Harris, E.
Planning, Implementation and Optimization of Future Space Missions using an Immersive Visualization Environment (IVE) Machine E. N. Harris, Lockheed Martin Space Systems, Denver, CO and George.W. Morgenthaler, U. of Colorado at Boulder History: A team of 3-D engineering visualization experts at the Lockheed Martin Space Systems Company have developed innovative virtual prototyping simulation solutions for ground processing and real-time visualization of design and planning of aerospace missions over the past 6 years. At the University of Colorado, a team of 3-D visualization experts are developing the science of 3-D visualization and immersive visualization at the newly founded BP Center for Visualization, which began operations in October, 2001. (See IAF/IAA-01-13.2.09, "The Use of 3-D Immersive Visualization Environments (IVEs) to Plan Space Missions," G. A. Dorn and G. W. Morgenthaler.) Progressing from Today's 3-D Engineering Simulations to Tomorrow's 3-D IVE Mission Planning, Simulation and Optimization Techniques: 3-D (IVEs) and visualization simulation tools can be combined for efficient planning and design engineering of future aerospace exploration and commercial missions. This technology is currently being developed and will be demonstrated by Lockheed Martin in the (IVE) at the BP Center using virtual simulation for clearance checks, collision detection, ergonomics and reach-ability analyses to develop fabrication and processing flows for spacecraft and launch vehicle ground support operations and to optimize mission architecture and vehicle design subject to realistic constraints. Demonstrations: Immediate aerospace applications to be demonstrated include developing streamlined processing flows for Reusable Space Transportation Systems and Atlas Launch Vehicle operations and Mars Polar Lander visual work instructions. Long-range goals include future international human and robotic space exploration missions such as the development of a Mars Reconnaissance Orbiter and Lunar Base construction scenarios. Innovative solutions utilizing Immersive Visualization provide the key to streamlining the mission planning and optimizing engineering design phases of future aerospace missions.
Engelmann, Carsten; Ametowobla, Dzifa
2017-05-17
Planning and controlling surgical operations hugely impacts upon productivity, patient safety, and surgeons' careers. Established, specialized software for this task is being increasingly replaced by "Operating Room (OR)-modules" appended to enterprise-wide resource planning (ERP) systems. As a result, usability problems are re-emerging and require developers' attention. Systematic evaluation of the functionality and social repercussions of a global, market-leading IT business control system (SAP R3, Germany), adapted for real-time OR process steering. Field study involving document analyses, interviews, and a 73-item survey addressed to 77 qualified (> 1-year system experience) senior planning executives (end users; "planners") working in surgical departments of university hospitals. Planners reported that 57% of electronic operation requests contained contradictory information. Key screens contained clinically irrelevant areas (36 +/- 29%). Compared to the legacy system, users reported either no improvements or worse performance, in regard to co-ordination of OR stakeholders, intra-day program changes, and safety. Planners concluded that the ERP-planning module was "non-intuitive" (66%), increased planning work (56%, p=0.002), and did not impact upon either organizational mishap spectrum or frequency. Interviews evidenced intra-institutional power shifts due to increased system complexity. Planners resented e.g. a trend towards increased personal culpability for mishap. Highly complex enterprise system extensions may not be directly suited to specific process steering tasks in a high risk/low error-environment like the OR. In view of surgeons' high primary task load, the repeated call for simpler IT is an imperative for ERP extensions. System design should consider a) that current OR IT suffers from an input limitation regarding planning-relevant real-time data, and b) that there are social processes that strongly affect planning and particularly ERP use beyond algorithms. Real improvement of clinical IT tools requires their independent evaluation according to standards developed for pharmaceutical subjects.
Advancing the state of the art in healthcare strategic planning.
Zuckerman, Alan M
2006-01-01
A recent survey of the state of strategic planning among healthcare organizations indicates that planners and executives believe that healthcare strategic planning practices are effective and provide the appropriate focus and direction for their organizations. When compared to strategic planning practices employed outside of the healthcare field, however, most healthcare strategic planning processes have not evolved to the more advanced, state-of-the-art levels of planning being used successfully outside of healthcare. While organizations that operate in stable markets may be able to survive using basic strategic planning practices, the volatile healthcare market demands that providers be nimble competitors with advanced, ongoing planning processes that drive growth and organizational effectiveness. What should healthcare organizations do to increase the rigor and sophistication of their strategic planning practices? This article identifies ten current healthcare strategic planning best practices and recommends five additional innovative approaches from pathbreaking companies outside of healthcare that have used advanced strategic planning practices to attain high levels of organizational success.
NASA Technical Reports Server (NTRS)
1981-01-01
The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and approval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Larson, Roy Edward; Walker, Grant W.
2002-12-31
Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.
Strategic Management of Resource Markets: An Exploratory Study of Department of Defense Contractors.
1982-04-01
prime contractors focusing on (1) the operation and functional content of strategic management systems and their approaches to identifying, prioritizing...Introduction Strategic Planning for Procurement Approaches to Strategic Planning Relationship with the Procurement Process Organizational Demands Studies...planning/management with the same skill, content and commitment, what suggested improvements can come from a study of the approaches used by the more
Code of Federal Regulations, 2010 CFR
2010-07-01
...) You must submit a waste management plan no later than April 5, 2004. (3) You must achieve final... affected CISWI unit is brought online, all necessary process changes and air pollution control devices... October 4, 2004. (2) You must submit a waste management plan no later than April 5, 2004. (3) You must...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fix, N. J.
The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).
The ARC/INFO geographic information system
NASA Astrophysics Data System (ADS)
Morehouse, Scott
1992-05-01
ARC/INFO is a general-purpose system for processing geographic information. It is based on a relatively simple model of geographic space—the coverage—and contains an extensive set of geoprocessing tools which operate on coverages. ARC/INFO is used in a wide variety of applications areas, including: natural-resource inventory and planning, cadastral database development and mapping, urban and regional planning, and cartography. This paper is an overview of ARC/INFO and discusses the ARC/INFO conceptual architecture, data model, operators, and user interface.
The management process, management information and control systems, and cybernetics
NASA Technical Reports Server (NTRS)
Zannetos, Z. S.; Wilcox, J. W.
1972-01-01
An attempt has been made to analyze the strengths and weaknesses of the cybernetics approach as applied to management. The conclusion is that cybernetics can serve not only as a conceptual philosophical aid, but also as an operational tool in both managerial planning and control. So far, however, most of its promise is yet unrealized; especially in the planning sphere. Only in the area of control of operations has the impact of this promising field shown tangible results.
Expert mission planning and replanning scheduling system for NASA KSC payload operations
NASA Technical Reports Server (NTRS)
Pierce, Roger
1987-01-01
EMPRESS (Expert Mission Planning and REplanning Scheduling System) is an expert system created to assist payload mission planners at Kennedy in the long range planning and scheduling of horizontal payloads for space shuttle flights. Using the current flight manifest, these planners develop mission and payload schedules detailing all processing to be performed in the Operations and Checkout building at Kennedy. With the EMPRESS system, schedules are generated quickly using standard flows that represent the tasks and resources required to process a specific horizontal carrier. Resources can be tracked and resource conflicts can be determined and resolved interactively. Constraint relationships between tasks are maintained and can be enforced when a task is moved or rescheduled. The domain, structure, and functionality of the EMPRESS system is briefly designed. The limitations of the EMPRESS system are described as well as improvements expected with the EMPRESS-2 development.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Taylor, Stan; Hightower, Jared; Knight, Koby
This report documents the process of planning, siting, and permitting recent LCNG station projects; identifying existing constraints in these processes, and recommendations for improvements; LCNG operating history.
Savannah River Site nuclear materials management plan FY 2017-2031
DOE Office of Scientific and Technical Information (OSTI.GOV)
Magoulas, V.
The purpose of the Nuclear Materials Management Plan (herein referred to as “this Plan”) is to integrate and document the activities required to disposition the legacy and/or surplus Enriched Uranium (EU) and Plutonium (Pu) and other nuclear materials already stored or anticipated to be received by facilities at the Department of Energy (DOE) Savannah River Site (SRS) as well as the activities to support the DOE Tritium mission. It establishes a planning basis for EU and Pu processing operations in Environmental Management Operations (EMO) facilities through the end of their program missions and for the tritium through the National Nuclearmore » Security Administration (NNSA) Defense Programs (DP) facilities. Its development is a joint effort among the Department of Energy - Savannah River (DOE-SR), DOE – Environmental Management (EM), NNSA Office of Material Management and Minimization (M3), NNSA Savannah River Field Office (SRFO), and the Management and Operations (M&O) contractor, Savannah River Nuclear Solutions, LLC (SRNS). Life-cycle program planning for Nuclear Materials Stabilization and Disposition and the Tritium Enterprise may use this Plan as a basis for the development of the nuclear materials disposition scope and schedule. This Plan assumes full funding to accomplish the required project and operations activities. It is recognized that some aspects of this Plan are pre decisional with regard to National Environmental Policy Act (NEPA); in such cases new NEPA actions will be required.« less
NASA Technical Reports Server (NTRS)
Chambers, Gary D.; King, Elizabeth A.; Oleson, Keith
1992-01-01
In response to the changing aerospace economic climate, Martin Marietta Astronautics Group (MMAG) has adopted a Total Quality Management (TQM) philosophy to maintain a competitive edge. TQM emphasizes continuous improvement of processes, motivation to improve from within, cross-functional involvement, people empowerment, customer satisfaction, and modern process control techniques. The four major initiatives of TQM are Product Excellence, Manufacturing Resource Planning (MRP II), People Empowerment, and Subcontract Management. The Defense Space and Communications (DS&C) Test Lab's definition and implementation of the MRP II and people empowerment initiatives within TQM are discussed. The application of MRP II to environmental test planning and operations processes required a new and innovative approach. In an 18 month span, the test labs implemented MRP II and people empowerment and achieved a Class 'A' operational status. This resulted in numerous benefits, both tangible and intangible, including significant cost savings and improved quality of life. A detailed description of the implementation process and results are addressed.
NASA Astrophysics Data System (ADS)
Chambers, Gary D.; King, Elizabeth A.; Oleson, Keith
1992-11-01
In response to the changing aerospace economic climate, Martin Marietta Astronautics Group (MMAG) has adopted a Total Quality Management (TQM) philosophy to maintain a competitive edge. TQM emphasizes continuous improvement of processes, motivation to improve from within, cross-functional involvement, people empowerment, customer satisfaction, and modern process control techniques. The four major initiatives of TQM are Product Excellence, Manufacturing Resource Planning (MRP II), People Empowerment, and Subcontract Management. The Defense Space and Communications (DS&C) Test Lab's definition and implementation of the MRP II and people empowerment initiatives within TQM are discussed. The application of MRP II to environmental test planning and operations processes required a new and innovative approach. In an 18 month span, the test labs implemented MRP II and people empowerment and achieved a Class 'A' operational status. This resulted in numerous benefits, both tangible and intangible, including significant cost savings and improved quality of life. A detailed description of the implementation process and results are addressed.
Scheduling Operational Operational-Level Courses of Action
2003-10-01
Process modelling and analysis – process synchronisation techniques Information and knowledge management – Collaborative planning systems – Workflow...logistics – Some tasks may consume resources The military user may wish to impose synchronisation constraints among tasks A military end state can be...effects, – constrained with resource and synchronisation considerations, and – lead to the achievement of conditions set in the end state. The COA is
Post-test navigation data analysis techniques for the shuttle ALT
NASA Technical Reports Server (NTRS)
1975-01-01
Postflight test analysis data processing techniques for shuttle approach and landing tests (ALT) navigation data are defined. Postfight test processor requirements are described along with operational and design requirements, data input requirements, and software test requirements. The postflight test data processing is described based on the natural test sequence: quick-look analysis, postflight navigation processing, and error isolation processing. Emphasis is placed on the tradeoffs that must remain open and subject to analysis until final definition is achieved in the shuttle data processing system and the overall ALT plan. A development plan for the implementation of the ALT postflight test navigation data processing system is presented. Conclusions are presented.
Automation--planning to implementation; the problems en route.
Pizer, I H
1976-01-01
Once the major decision to automate library processes is made, there are a variety of problems which may be encountered before the planned system becomes operational. These include problems of personnel, budget, procurement of adjunct services, institutional priorities, and manufacturing uncertainties. Actual and potential difficulties are discussed. PMID:1247703
30 CFR 582.5 - Disclosure of data and information to the public.
Code of Federal Regulations, 2012 CFR
2012-07-01
... public. 582.5 Section 582.5 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE... or more leases, to ensure proper Mining Plans for a common orebody, or to promote operational safety...), unitization agreement, or joint Mining Plan. (c) Geophysical data, processed geophysical information, and...
30 CFR 582.5 - Disclosure of data and information to the public.
Code of Federal Regulations, 2013 CFR
2013-07-01
... public. 582.5 Section 582.5 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE... or more leases, to ensure proper Mining Plans for a common orebody, or to promote operational safety...), unitization agreement, or joint Mining Plan. (c) Geophysical data, processed geophysical information, and...
30 CFR 582.5 - Disclosure of data and information to the public.
Code of Federal Regulations, 2014 CFR
2014-07-01
... public. 582.5 Section 582.5 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE... or more leases, to ensure proper Mining Plans for a common orebody, or to promote operational safety...), unitization agreement, or joint Mining Plan. (c) Geophysical data, processed geophysical information, and...
This July 2011 document contains questions and answers on the Hospital/Medical/Infectious Waste Incinerators (HMIWI) regulations. The questions cover topics such as state plan requirements, compliance, applicability, operator training, and more.
Projecting Program Cost Over an Adequate Time Horizon.
ERIC Educational Resources Information Center
Spencer, Milton
Planning Programming Budgeting Systems involve the introduction of three major operational concepts. First, the development of an analytical capability to examine in depth both agency objectives and the various programs to meet these objectives. Second, the formation of a five-year planning and programming process combined with a sophisticated…
ERIC Educational Resources Information Center
Anderson, Nancy; And Others
This is one of a set of five handbooks compiled by the Northwest Regional Educational Laboratory which describes the processes for planning and operating a total Experience-Based Career Education (EBCE) program. Processes and material are those developed by the original EBCE model--Community Experiences in Career Education or (CE)2. The area of…
State involvement in and use of LANDSAT technology
NASA Technical Reports Server (NTRS)
Tessar, P. A.
1981-01-01
The background of state involvement in LANDSAT systems planning and the status of state LANDSAT use are reviewed. Major recommendations on data continuity; frequency and pattern of observation; state representation in program management; pointable sensors for a fully operational system; data processing systems; data pricing; data copyright; data archival; and technology transfer are highlighted. Plans of the government regarding the LANDSAT system are reflected in the FY-1982 budget process are examined.
Operations Research in a New Spanish Air Force Planning System
1991-06-01
Forces around the world can get all or almost all its means through its own national defense industry . Every year countries are reducing their Defense...Development (FSD). 4. Milestone III: Production . 5. Milestone IV: Based on the moedification of an existing weapon system. The process is much more...the USAF planning system defines their requirements at medium and long range, and the national industries follow a process that ends with the
Use of automated rendezvous trajectory planning to improve spacecraft operations efficiency
NASA Technical Reports Server (NTRS)
Mulder, Tom A.
1991-01-01
The current planning process for space shuttle rendezvous with a second Earth-orbiting vehicle is time consuming and costly. It is a labor-intensive, manual process performed pre-mission with the aid of specialized maneuver processing tools. Real-time execution of a rendezvous plan must closely follow a predicted trajectory, and targeted solutions leading up to the terminal phase are computed on the ground. Despite over 25 years of Gemini, Apollo, Skylab, and shuttle vehicle-to-vehicle rendezvous missions flown to date, rendezvous in Earth orbit still requires careful monitoring and cannot be taken for granted. For example, a significant trajectory offset was experienced during terminal phase rendezvous of the STS-32 Long Duration Exposure Facility retrieval mission. Several improvements can be introduced to the present rendezvous planning process to reduce costs, produce more fuel-efficient profiles, and increase the probability of mission success.
Leva, M C; Cahill, J; Kay, A M; Losa, G; McDonald, N
2010-02-01
This paper presents the findings of research relating to the specification of a new human factors report, conducted as part of the work requirements for the Human Integration into the Lifecycle of Aviation Systems project, sponsored by the European Commission. Specifically, it describes the proposed concept for a unique report, which will form the basis for all operational and safety reports completed by flight crew. This includes all mandatory and optional reports. Critically, this form is central to the advancement of improved processes and technology tools, supporting airline performance management, safety management, organisational learning and knowledge integration/information-sharing activities. Specifically, this paper describes the background to the development of this reporting form, the logic and contents of this form and how reporting data will be made use of by airline personnel. This includes a description of the proposed intelligent planning process and the associated intelligent flight plan concept, which makes use of airline operational and safety analyses information. Primarily, this new reporting form has been developed in collaboration with a major Spanish airline. In addition, it has involved research with five other airlines. Overall, this has involved extensive field research, collaborative prototyping and evaluation of new reports/flight plan concepts and a number of evaluation activities. Participants have included both operational and management personnel, across different airline flight operations processes. Statement of Relevance: This paper presents the development of a reporting concept outlined through field research and collaborative prototyping within an airline. The resulting reporting function, embedded in the journey log compiled at the end of each flight, aims at enabling employees to audit the operations of the company they work for.
Long-Term Planning for Open Pits for Mining Sulphide-Oxide Ores in Order to Achieve Maximum Profit
NASA Astrophysics Data System (ADS)
Kržanović, Daniel; Conić, Vesna; Stevanović, Dejan; Kolonja, Božo; Vaduvesković, Jovan
2017-12-01
Profitable exploitation of mineralised material from the earth's crust is a complex and difficult task that depends on a comprehensive planning process. Answering the question of how to plan production depends on the geometry of the deposit, as well as the concentration, distribution, and type of minerals in it. The complex nature of mineral deposits largely determines the method of exploitation and profitability of mining operations. In addition to unit operating costs and metal prices, the optimal recovery of and achievement of maximum profit from deposits of sulphide-oxide ores also depend, to a significant extent, on the level of technological recovery achieved in the ore processing procedure. Therefore, in defining a long-term development strategy for open pits, special attention must be paid to the selection of an optimal procedure for ore processing in order to achieve the main objective: maximising the Net Present Value (NPV). The effect of using two different processes, flotation processing and hydrometallurgical methods (bioleaching acid leaching), on determining the ultimate pit is shown in the case of the Kraku Bugaresku-Cementacija sulphide-oxide ore deposit in eastern Serbia. Analysis shows that the application of hydrometallurgical methods of processing sulphide-oxide ore achieved an increase in NPV of 20.42%.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Heubach, J.G.; Weimer, W.C.; Bruce, W.A.
Facility master planning is critical to the future productivity of a laboratory and the quality of worklife for the laboratory staff. For organizations undergoing programmatic re-direction, a master facility planning approach linked to the organization`s strategic planning process is even more important. Major changes in an organization such as programmatic re-direction can significantly impact a broad range of variables which exceed the expertise of traditional planning teams, e.g., capacity variability, work team organization, organizational culture, and work process simplification. By expanding the diversity of the participants of the planning team, there is a greater likelihood that a research organization`s scientific,more » organizational, economic, and employees` needs can be meshed in the strategic plan and facility plan. Recent recommendations from facility planners suggest drawing from diverse fields in building multi-disciplinary planning teams: Architecture, engineering, natural science, social psychology, and strategic planning (Gibson,1993). For organizations undergoing significant operational or culture change, the master facility planning team should also include members with expertise in organizational effectiveness, industrial engineering, human resources, and environmental psychology. A recent planning and design project provides an example which illustrates the use of an expanded multi-disciplinary team engaged in planning laboratory renovations for a research organization undergoing programmatic re-direction. The purpose of the proposed poster session is to present a multi-disciplinary master facility planning process linked to an organization`s strategic planning process or organizational strategies.« less
OPALS: Mission System Operations Architecture for an Optical Communications Demonstration on the ISS
NASA Technical Reports Server (NTRS)
Abrahamson, Matthew J.; Sindiy, Oleg V.; Oaida, Bogdan V.; Fregoso, Santos; Bowles-Martinez, Jessica N.; Kokorowski, Michael; Wilkerson, Marcus W.; Konyha, Alexander L.
2014-01-01
In spring 2014, the Optical PAyload for Lasercomm Science (OPALS) will launch to the International Space Station (ISS) to demonstrate space-to-ground optical communications. During a 90-day baseline mission, OPALS will downlink high quality, short duration videos to the Optical Communications Telescope Laboratory (OCTL) in Wrightwood, California. To achieve mission success, interfaces to the ISS payload operations infrastructure are established. For OPALS, the interfaces facilitate activity planning, hazardous laser operations, commanding, and telemetry transmission. In addition, internal processes such as pointing prediction and data processing satisfy the technical requirements of the mission. The OPALS operations team participates in Operational Readiness Tests (ORTs) with external partners to exercise coordination processes and train for the overall mission. The tests have provided valuable insight into operational considerations on the ISS.
Power system restoration - A task force report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adibi, M.; Clelland, P.; Fink, L.
1986-01-01
The IEEE PES System Operation Subcommittee has established the Power System Restoration Task Force to: review operating practices, conduct a literature search, prepare relevant glossaries and bibliographies, and promote information exchange through technical papers. This is the first report of the Task Force. The problem of bulk power system restoration following a complete or partial collapse is practically as old as the electric utility industry itself. Many electric utilities have developed over the years system restoration schemes that meet the needs of their particular systems. These plans provide a great deal of insight into how the restorative process is viewedmore » by operating and planning personnel and what concerns and constraints any plan must operate under. The body of the report consists of notes prepared by members of the Task Force. It should not be interred that a complete reporting on Power System Restoration is undertaken here. The intent is to report upon work of the Task Force to date. The report also reviews several different restoration plans and shows their common concerns and constraints.« less
Supporting Real-Time Operations and Execution through Timeline and Scheduling Aids
NASA Technical Reports Server (NTRS)
Marquez, Jessica J.; Pyrzak, Guy; Hashemi, Sam; Ahmed, Samia; McMillin, Kevin Edward; Medwid, Joseph Daniel; Chen, Diana; Hurtle, Esten
2013-01-01
Since 2003, the NASA Ames Research Center has been actively involved in researching and advancing the state-of-the-art of planning and scheduling tools for NASA mission operations. Our planning toolkit SPIFe (Scheduling and Planning Interface for Exploration) has supported a variety of missions and field tests, scheduling activities for Mars rovers as well as crew on-board International Space Station and NASA earth analogs. The scheduled plan is the integration of all the activities for the day/s. In turn, the agents (rovers, landers, spaceships, crew) execute from this schedule while the mission support team members (e.g., flight controllers) follow the schedule during execution. Over the last couple of years, our team has begun to research and validate methods that will better support users during realtime operations and execution of scheduled activities. Our team utilizes human-computer interaction principles to research user needs, identify workflow processes, prototype software aids, and user test these. This paper discusses three specific prototypes developed and user tested to support real-time operations: Score Mobile, Playbook, and Mobile Assistant for Task Execution (MATE).
ATHLETE's Feet: Mu1ti-Resolution Planning for a Hexapod Robot
NASA Technical Reports Server (NTRS)
Smith, Tristan B.; Barreiro, Javier; Smith, David E.; SunSpiral, Vytas; Chavez-Clemente, Daniel
2008-01-01
ATHLETE is a large six-legged tele-operated robot. Each foot is a wheel; travel can be achieved by walking, rolling, or some combination of the two. Operators control ATHLETE by selecting parameterized commands from a command dictionary. While rolling can be done efficiently with a single command, any motion involving steps is cumbersome - walking a few meters through difficult terrain can take hours. Our goal is to improve operator efficiency by automatically generating sequences of motion commands. There is increasing uncertainty regarding ATHLETE s actual configuration over time and decreasing quality of terrain data farther away from the current position. This, combined with the complexity that results from 36 degrees of kinematic freedom, led to an architecture that interleaves planning and execution at multiple levels, ranging from traditional configuration space motion planning algorithms for immediate moves to higher level task and path planning algorithms for overall travel. The modularity of the architecture also simplifies the development process and allows the operator to interact with and control the system at varying levels of autonomy depending on terrain and need.
SSS-A attitude control prelaunch analysis and operations plan
NASA Technical Reports Server (NTRS)
Werking, R. D.; Beck, J.; Gardner, D.; Moyer, P.; Plett, M.
1971-01-01
A description of the attitude control support being supplied by the Mission and Data Operations Directorate is presented. Descriptions of the computer programs being used to support the mission for attitude determination, prediction, control, and definitive attitude processing are included. In addition, descriptions of the operating procedures which will be used to accomplish mission objectives are provided.
NIF Operations Management Plan, August 2011
DOE Office of Scientific and Technical Information (OSTI.GOV)
Van Wonterghem, Bruno M.
Lawrence Livermore National Laboratory’s (LLNL) National Ignition Facility (NIF) is a key component of the National Nuclear Security Administration’s (NNSA) Stockpile Stewardship Program, whose purpose is to maintain the safety, reliability, and effectiveness of our nation’s nuclear stockpile without underground nuclear testing. The NIF is crucial to the Stockpile Stewardship Program because it is the only facility that can create the conditions of extreme temperature and pressure—conditions that exist only in stars or in exploding nuclear weapons—that are relevant to understanding how our modern nuclear weapons operate. As such, the NIF’s primary mission is to attain fusion ignition in themore » laboratory. Fusion ignition not only supports Stockpile Stewardship needs, but also provides the basis for future decisions about fusion’s potential as a long-term energy source. Additionally, NIF provides scientists with access to high-energy-density regimes that can yield new insight and understanding in the areas of astrophysics, hydrodynamics, material properties, plasma physics, and radiative properties. The use of the NIF to support the Stockpile Stewardship Program and the advancement of basic high-energy-density science understanding is planned and managed through program-level execution plans and NIF directorate-level management teams. An example of a plan is the National Ignition Campaign Execution Plan. The NIF Operations Management Plan provides an overview of the NIF Operations organization and describes how the NIF is supported by the LLNL infrastructure and how it is safely and responsibly managed and operated. Detailed information on NIF management of the organization is found in a series of supporting plans, policies, and procedures. A list of related acronyms can be found in Appendix A of this document. The purpose of this document is to provide a roadmap of how the NIF Operations organization functions. It provides a guide to understanding the requirements, document flow down, organizational vision and mission, performance metrics, and interrelationship of the NIF Operations organization with other directorate and laboratory organizations. This document also provides a listing of roles and responsibilities, core processes, procedures, authority matrices, change control boards, and other information necessary for successfully functioning in the NIF Operations organization. This document, the NIF Shot Operations Plan, and the NIF Maintenance Plan together represent the primary documents satisfying our Conduct of Operations compliance requirement.« less
Low-Cost SIRTF Flight Operations
NASA Astrophysics Data System (ADS)
Deutsch, M.-J.; Ebersole, M.; Nichols, J.
1997-12-01
The Space Infrared Telescope Facility (SIRTF) , the fourth of the Great Observatories, will be placed in a unique solar orbit trailing the Earth, in 2001. SIRTF will acquire both imaging and spectral data using large infrared detector arrays from 3.5mm to 160mm. The primary science objectives are (1) search for and study of brown dwarfs and super planets, (2) discovery and study of protoplanetary debris disks, (3) study of ultraluminous galaxies and active galactic nuclei, and (4) study of the early Universe. Driven by the limited cryogenic lifetime of 2.5 years, with a goal of 5 years, and the severely cost-capped development, a Mission Planning and Operations system is being designed that will result in high on-board efficiency (>90%) and low-cost operation, yet will accommodate rapid response science requirements . SIRTF is designing an architecture for an operations system that will be shared between science and flight operations. Crucial to this effort is the philosophy of an integrated science and engineering plan, co-location, cross-training of teams and common planning tools. The common tool set will enable the automatic generation of an integrated and conflict free planned schedule accommodating 20 000 observations and engineering activities a year. The shared tool set will help generate standard observations , (sometimes non-standard) engineering activities and manage the ground and flight resources and constraints appropriately. The ground software will allow the development from the ground of robust event driven sequences. Flexibility will be provided to incorporate newly discovered science opportunities or health issues late in the process and via quick links. This shared science and flight operations process if used from observation selection through sequence and command generation, will provide a low-cost operations system. Though SIRTF is a 'Great Observatory', its annual mission operations costs will more closely resemble those of an Explorer class mission.
Configuration Management Plan for the Tank Farm Contractor
DOE Office of Scientific and Technical Information (OSTI.GOV)
WEIR, W.R.
The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less
Airborne Oceanographic Lidar (AOL) (Global Carbon Cycle)
NASA Technical Reports Server (NTRS)
2003-01-01
This bimonthly contractor progress report covers the operation, maintenance and data management of the Airborne Oceanographic Lidar and the Airborne Topographic Mapper. Monthly activities included: mission planning, sensor operation and calibration, data processing, data analysis, network development and maintenance and instrument maintenance engineering and fabrication.
Review of the transportation planning process in the Kansas City metropolitan area
DOT National Transportation Integrated Search
2013-01-01
In 2010 the FHWA Office of Operations, Office of Transportation Management (HOTM) commissioned the development of a white paper, Data Capture and Management: Needs and Gaps in the Operation and Coordination of U.S. DOT Data Capture and Management Pro...
Finalizing the Libby Action Plan Research Program
Libby, Montana is the location of a former vermiculite mine that operated from 1923 to 1990. The vermiculite ore from the mine co-existed with amphibole asbestos, referred to as Libby Amphibole Asbestos (LAA). Combined with the cessation of the asbestos mining and processing oper...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-06
... analyses and the development of other elements of the standard; developing a written action plan for..., revalidating and retaining the process hazard analysis; developing and implementing written operating [[Page 66639
Smessaert, A H
1992-10-01
In the late 1980s Holy Cross Health System (HCHS), South Bend, IN, began to implement a revised strategic planning and budgeting process to effectively link the system's mission with its day-to-day operations. Leaders wanted a process that would help system employees internalize and act on the four major elements articulated in the HCHS mission statement: fidelity, excellence, empowerment, and stewardship. Representatives from mission, strategic planning, and finance from the corporate office and subsidiaries examined planning and budgeting methods. From the beginning, HCHS leaders decided that the process should be implemented gradually, with each step focusing on refining methodology and improving mission integration. As the process evolved. HCHS developed a sequence in which planning preceded budgeting. The system also developed a variety of educational and collaborative initiatives to help system employees adapt to the organization's change of direction. One critical aspect of HCHS's ongoing education is an ethical reflection process that helps participants balance ethical considerations by viewing an issue from three perspectives: social vision, multiple responsibility, and self-interest.
Implementing Distributed Operations: A Comparison of Two Deep Space Missions
NASA Technical Reports Server (NTRS)
Mishkin, Andrew; Larsen, Barbara
2006-01-01
Two very different deep space exploration missions--Mars Exploration Rover and Cassini--have made use of distributed operations for their science teams. In the case of MER, the distributed operations capability was implemented only after the prime mission was completed, as the rovers continued to operate well in excess of their expected mission lifetimes; Cassini, designed for a mission of more than ten years, had planned for distributed operations from its inception. The rapid command turnaround timeline of MER, as well as many of the operations features implemented to support it, have proven to be conducive to distributed operations. These features include: a single science team leader during the tactical operations timeline, highly integrated science and engineering teams, processes and file structures designed to permit multiple team members to work in parallel to deliver sequencing products, web-based spacecraft status and planning reports for team-wide access, and near-elimination of paper products from the operations process. Additionally, MER has benefited from the initial co-location of its entire operations team, and from having a single Principal Investigator, while Cassini operations have had to reconcile multiple science teams distributed from before launch. Cassini has faced greater challenges in implementing effective distributed operations. Because extensive early planning is required to capture science opportunities on its tour and because sequence development takes significantly longer than sequence execution, multiple teams are contributing to multiple sequences concurrently. The complexity of integrating inputs from multiple teams is exacerbated by spacecraft operability issues and resource contention among the teams, each of which has their own Principal Investigator. Finally, much of the technology that MER has exploited to facilitate distributed operations was not available when the Cassini ground system was designed, although later adoption of web-based and telecommunication tools has been critical to the success of Cassini operations.
Simulation of textile manufacturing processes for planning, scheduling, and quality control purposes
NASA Astrophysics Data System (ADS)
Cropper, A. E.; Wang, Z.
1995-08-01
Simulation, as a management information tool, has been applied to engineering manufacture and assembly operations. The application of the principles to textile manufacturing (fiber to fabric) is discussed. The particular problems and solutions in applying the simulation software package to the yarn production processes are discussed with an indication of how the software achieves the production schedule. The system appears to have application in planning, scheduling, and quality assurance. The latter being a result of the traceability possibilities through a process involving mixing and splitting of material.
Multigeneration data migration from legacy systems
NASA Astrophysics Data System (ADS)
Ratib, Osman M.; Liu, Brent J.; Kho, Hwa T.; Tao, Wenchao; Wang, Cun; McCoy, J. Michael
2003-05-01
The migration of image data from different generations of legacy archive systems represents a technical challenge and in incremental cost in transitions to newer generations of PACS. UCLA medical center has elected to completely replace the existing PACS infrastructure encompassing several generations of legacy systems by a new commercial system providing enterprise-wide image management and communication. One of the most challenging parts of the project was the migration of large volumes of legacy images into the new system. Planning of the migration required the development of specialized software and hardware, and included different phases of data mediation from existing databases to the new PACS database prior to the migration of the image data. The project plan included a detailed analysis of resources and cost of data migration to optimize the process and minimize the delay of a hybrid operation where the legacy systems need to remain operational. Our analysis and project planning showed that the data migration represents the most critical path in the process of PACS renewal. Careful planning and optimization of the project timeline and resources allocated is critical to minimize the financial impact and the time delays that such migrations can impose on the implementation plan.
NASA Technical Reports Server (NTRS)
Hornstein, Rhoda S.; Wunderlich, Dana A.; Willoughby, John K.
1992-01-01
New and innovative software technology is presented that provides a cost effective bridge for smoothly transitioning prototype software, in the field of planning and scheduling, into an operational environment. Specifically, this technology mixes the flexibility and human design efficiency of dynamic data typing with the rigor and run-time efficiencies of static data typing. This new technology provides a very valuable tool for conducting the extensive, up-front system prototyping that leads to specifying the correct system and producing a reliable, efficient version that will be operationally effective and will be accepted by the intended users.
Contingency Management Requirements Document: Preliminary Version. Revision F
NASA Technical Reports Server (NTRS)
2005-01-01
This is the High Altitude, Long Endurance (HALE) Remotely Operated Aircraft (ROA) Contingency Management (CM) Functional Requirements document. This document applies to HALE ROA operating within the National Airspace System (NAS) limited at this time to enroute operations above 43,000 feet (defined as Step 1 of the Access 5 project, sponsored by the National Aeronautics and Space Administration). A contingency is an unforeseen event requiring a response. The unforeseen event may be an emergency, an incident, a deviation, or an observation. Contingency Management (CM) is the process of evaluating the event, deciding on the proper course of action (a plan), and successfully executing the plan.
Armored Family of Vehicles (AFV). Phase 1 Report. Book 7. Volume 11
1987-08-31
Armored Family of Vehicles. Specific requirements and products are described which initiate the training development process and a training management ...approach for the TRADOC and proponent schools to plan, develop, manage and integrate the training subsystem(s) for the Armored Family of Vehicles...Procedures. q. Charter, Armored Family of Vehicles. r. Operational and Organizational (O&W) Plan for AFV. s. System MANPRINT Management Plan for AFV
TAMU: A New Space Mission Operations Paradigm
NASA Technical Reports Server (NTRS)
Meshkat, Leila; Ruszkowski, James; Haensly, Jean; Pennington, Granvil A.; Hogle, Charles
2011-01-01
The Transferable, Adaptable, Modular and Upgradeable (TAMU) Flight Production Process (FPP) is a model-centric System of System (SoS) framework which cuts across multiple organizations and their associated facilities, that are, in the most general case, in geographically diverse locations, to develop the architecture and associated workflow processes for a broad range of mission operations. Further, TAMU FPP envisions the simulation, automatic execution and re-planning of orchestrated workflow processes as they become operational. This paper provides the vision for the TAMU FPP paradigm. This includes a complete, coherent technique, process and tool set that result in an infrastructure that can be used for full lifecycle design and decision making during any flight production process. A flight production process is the process of developing all products that are necessary for flight.
Manufacturing Squares: An Integrative Statistical Process Control Exercise
ERIC Educational Resources Information Center
Coy, Steven P.
2016-01-01
In the exercise, students in a junior-level operations management class are asked to manufacture a simple product. Given product specifications, they must design a production process, create roles and design jobs for each team member, and develop a statistical process control plan that efficiently and effectively controls quality during…
Union Carbide Corp. polysilicon status and plans
NASA Technical Reports Server (NTRS)
Leipold, M. H.
1982-01-01
The status of polysilicon activities is summarized highlighted by moving the silane portion of the experimental process system development unit (EPSDU) to Washougal, Washington. The completion and operation of the silane EPSDU, is discussed along with research on the silane-to-silicon deposition process. Progress on the dichlorosilane process is also reported.
Discrete State Change Model of Manufacturing Quality to Aid Assembly Process Design
NASA Astrophysics Data System (ADS)
Koga, Tsuyoshi; Aoyama, Kazuhiro
This paper proposes a representation model of the quality state change in an assembly process that can be used in a computer-aided process design system. In order to formalize the state change of the manufacturing quality in the assembly process, the functions, operations, and quality changes in the assembly process are represented as a network model that can simulate discrete events. This paper also develops a design method for the assembly process. The design method calculates the space of quality state change and outputs a better assembly process (better operations and better sequences) that can be used to obtain the intended quality state of the final product. A computational redesigning algorithm of the assembly process that considers the manufacturing quality is developed. The proposed method can be used to design an improved manufacturing process by simulating the quality state change. A prototype system for planning an assembly process is implemented and applied to the design of an auto-breaker assembly process. The result of the design example indicates that the proposed assembly process planning method outputs a better manufacturing scenario based on the simulation of the quality state change.
30 CFR 282.5 - Disclosure of data and information to the public.
Code of Federal Regulations, 2011 CFR
2011-07-01
... public. 282.5 Section 282.5 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND... unitization of operations on two or more leases, to ensure proper Mining Plans for a common orebody, or to... the affected lease(s), unitization agreement, or joint Mining Plan. (c) Geophysical data, processed...
40 CFR 96.284 - Opt-in process.
Code of Federal Regulations, 2010 CFR
2010-07-01
... TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR SO2 Opt-in Units... of interim review, if the plan appears to contain information demonstrating that the SO2 emissions... section, the owner or operator shall monitor and report the SO2 emissions rate and the heat input of the...
40 CFR 63.7720 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2012 CFR
2012-07-01
... operation and maintenance requirements in this subpart at all times, except during periods of startup... process and emissions control equipment. (c) You must develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3). The startup, shutdown, and malfunction plan also must...
40 CFR 63.7720 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2010 CFR
2010-07-01
... operation and maintenance requirements in this subpart at all times, except during periods of startup... process and emissions control equipment. (c) You must develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3). The startup, shutdown, and malfunction plan also must...
40 CFR 63.7720 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2011 CFR
2011-07-01
... operation and maintenance requirements in this subpart at all times, except during periods of startup... process and emissions control equipment. (c) You must develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3). The startup, shutdown, and malfunction plan also must...
40 CFR 63.7720 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2013 CFR
2013-07-01
... operation and maintenance requirements in this subpart at all times, except during periods of startup... process and emissions control equipment. (c) You must develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3). The startup, shutdown, and malfunction plan also must...
40 CFR 63.7720 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2014 CFR
2014-07-01
... operation and maintenance requirements in this subpart at all times, except during periods of startup... process and emissions control equipment. (c) You must develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3). The startup, shutdown, and malfunction plan also must...
14 CFR Appendix B to Part 150 - Noise Compatibility Programs
Code of Federal Regulations, 2014 CFR
2014-01-01
... (CONTINUED) AIRPORTS AIRPORT NOISE COMPATIBILITY PLANNING Pt. 150, App. B Appendix B to Part 150—Noise... compatibility program is: (1) To promote a planning process through which the airport operator can examine and... airport (for example, an evaluation of night curfews is not appropriate if there are no night flights and...
14 CFR Appendix B to Part 150 - Noise Compatibility Programs
Code of Federal Regulations, 2010 CFR
2010-01-01
... (CONTINUED) AIRPORTS AIRPORT NOISE COMPATIBILITY PLANNING Pt. 150, App. B Appendix B to Part 150—Noise... compatibility program is: (1) To promote a planning process through which the airport operator can examine and... airport (for example, an evaluation of night curfews is not appropriate if there are no night flights and...
14 CFR Appendix B to Part 150 - Noise Compatibility Programs
Code of Federal Regulations, 2013 CFR
2013-01-01
... (CONTINUED) AIRPORTS AIRPORT NOISE COMPATIBILITY PLANNING Pt. 150, App. B Appendix B to Part 150—Noise... compatibility program is: (1) To promote a planning process through which the airport operator can examine and... airport (for example, an evaluation of night curfews is not appropriate if there are no night flights and...
14 CFR Appendix B to Part 150 - Noise Compatibility Programs
Code of Federal Regulations, 2011 CFR
2011-01-01
... (CONTINUED) AIRPORTS AIRPORT NOISE COMPATIBILITY PLANNING Pt. 150, App. B Appendix B to Part 150—Noise... compatibility program is: (1) To promote a planning process through which the airport operator can examine and... airport (for example, an evaluation of night curfews is not appropriate if there are no night flights and...
14 CFR Appendix B to Part 150 - Noise Compatibility Programs
Code of Federal Regulations, 2012 CFR
2012-01-01
... (CONTINUED) AIRPORTS AIRPORT NOISE COMPATIBILITY PLANNING Pt. 150, App. B Appendix B to Part 150—Noise... compatibility program is: (1) To promote a planning process through which the airport operator can examine and... airport (for example, an evaluation of night curfews is not appropriate if there are no night flights and...
Using virtual reality for science mission planning: A Mars Pathfinder case
NASA Technical Reports Server (NTRS)
Kim, Jacqueline H.; Weidner, Richard J.; Sacks, Allan L.
1994-01-01
NASA's Mars Pathfinder Project requires a Ground Data System (GDS) that supports both engineering and scientific payloads with reduced mission operations staffing, and short planning schedules. Also, successful surface operation of the lander camera requires efficient mission planning and accurate pointing of the camera. To meet these challenges, a new software strategy that integrates virtual reality technology with existing navigational ancillary information and image processing capabilities. The result is an interactive workstation based applications software that provides a high resolution, 3-dimensial, stereo display of Mars as if it were viewed through the lander camera. The design, implementation strategy and parametric specification phases for the development of this software were completed, and the prototype tested. When completed, the software will allow scientists and mission planners to access simulated and actual scenes of Mars' surface. The perspective from the lander camera will enable scientists to plan activities more accurately and completely. The application will also support the sequence and command generation process and will allow testing and verification of camera pointing commands via simulation.
Involving the Deaf Community in the Training Process
ERIC Educational Resources Information Center
Jones, Ray L.
1972-01-01
Discussed are strategies that have been found successful in operating a national leadership training program for deaf persons such as consulting deaf persons about all phases of training, planning, operation, and evaluation, accepting deaf trainees, and acquiring first hand acquaintance with deaf people from the community. (GW)
Parallel plan execution with self-processing networks
NASA Technical Reports Server (NTRS)
Dautrechy, C. Lynne; Reggia, James A.
1989-01-01
A critical issue for space operations is how to develop and apply advanced automation techniques to reduce the cost and complexity of working in space. In this context, it is important to examine how recent advances in self-processing networks can be applied for planning and scheduling tasks. For this reason, the feasibility of applying self-processing network models to a variety of planning and control problems relevant to spacecraft activities is being explored. Goals are to demonstrate that self-processing methods are applicable to these problems, and that MIRRORS/II, a general purpose software environment for implementing self-processing models, is sufficiently robust to support development of a wide range of application prototypes. Using MIRRORS/II and marker passing modelling techniques, a model of the execution of a Spaceworld plan was implemented. This is a simplified model of the Voyager spacecraft which photographed Jupiter, Saturn, and their satellites. It is shown that plan execution, a task usually solved using traditional artificial intelligence (AI) techniques, can be accomplished using a self-processing network. The fact that self-processing networks were applied to other space-related tasks, in addition to the one discussed here, demonstrates the general applicability of this approach to planning and control problems relevant to spacecraft activities. It is also demonstrated that MIRRORS/II is a powerful environment for the development and evaluation of self-processing systems.
Whole community planning: building resiliency at the local level.
Grimm, Dee
2014-01-01
Business continuity planning often looks to preserving internal operations and focuses on customer retention as a marker for a successful outcome after a disaster. Building more resilient continuity plans also means planning for the survival of the community at large. As the national emphasis in the USA on 'whole community planning' becomes prominent guidance for emergency management planning, this paper examines the implications for businesses as members of the whole community and how they can increase their involvement in the whole community process. The paper will also discuss the impediments to and benefits of becoming a partner in planning for the community at large.
Nummer, Brian A
2013-11-01
Kombucha is a fermented beverage made from brewed tea and sugar. The taste is slightly sweet and acidic and it may have residual carbon dioxide. Kombucha is consumed in many countries as a health beverage and it is gaining in popularity in the U.S. Consequently, many retailers and food service operators are seeking to brew this beverage on site. As a fermented beverage, kombucha would be categorized in the Food and Drug Administration model Food Code as a specialized process and would require a variance with submission of a food safety plan. This special report was created to assist both operators and regulators in preparing or reviewing a kombucha food safety plan.
NASA Astrophysics Data System (ADS)
Adler, D. S.
2000-12-01
The Science Planning and Scheduling Team (SPST) of the Space Telescope Science Institute (STScI) has historically operated exclusively under VMS. Due to diminished support for VMS-based platforms at STScI, SPST is in the process of transitioning to Unix operations. In the summer of 1999, SPST selected Python as the primary scripting language for the operational tools and began translation of the VMS DCL code. As of October 2000, SPST has installed a utility library of 16 modules consisting of 8000 lines of code and 80 Python tools consisting of 13000 lines of code. All tasks related to calendar generation have been switched to Unix operations. Current work focuses on translating the tools used to generate the Science Mission Specifications (SMS). The software required to generate the Mission Schedule and Command Loads (PASS), maintained by another team at STScI, will take longer to translate than the rest of the SPST operational code. SPST is planning on creating tools to access PASS from Unix in the short term. We are on schedule to complete the work needed to fully transition SPST to Unix operations (while remotely accessing PASS on VMS) by the fall of 2001.
Carcagno, G J; Kemper, P
1983-01-01
This paper describes the design of the National Long Term Care Demonstration and its evaluation and discusses a number of operational issues encountered in the design process: simultaneous design of research and operations, identification of the target population, randomization, collection of comparable data, development of an assessment instrument, potential changes in existing programs, and termination planning.
Optimization of USMC Hornet Inventory
2016-06-01
maintenance activities while adhering to the required number of aircraft for 22 operational use. He introduced an optimization based on an ILP... operational requirements across the entire planning process. In dealing with tail assignment as an optimization problem instead of a feasibility...aircraft and the goal is to minimize the penalties associated with failing to meet operational requirements. This research focuses on the optimal
Building a vision for the future: strategic planning in a shared governance nursing organization.
Baker, C; Beglinger, J E; Bowles, K; Brandt, C; Brennan, K M; Engelbaugh, S; Hallock, T; LaHam, M
2000-06-01
Today's health care delivery environment is marked by extreme turbulence and ever-increasing complexity. Now, more than ever, an organization's strategic plan must do more than outline a business plan. Rather, the strategic plan is a fundamental tool for building and sustaining an organizational vision for the future. The strong, dynamic strategic plan (1) represents a long-range vision for improving organizational performance, (2) provides a model for planning and implementing structures and processes for the management of outcomes, (3) reflects and shapes the organizational culture and customer focus, (4) provides decision support for difficult operational choices made day to day, and (5) integrates and aligns the work of the organization. This article describes the development, implementation, and evaluation of a methodology for strategic planning within a shared governance nursing organization. Built upon the strategic plan of the hospital, the process undertaken by the nursing organization reflects the following commitments: (1) to develop a strategic plan that is meaningful and part of daily work life at all levels of the nursing organization, (2) to make the plan practical and realistic through incremental building, (3) to locate and articulate accountability for each step, and (4) to build in a process for checking progress toward goal achievement and readjusting the plan as necessary.
Developing talent for operational excellence.
Theadore, Jason C; O'Brien, Thaddeus J
2012-01-01
Many organizations have the expectation that their employees will prepare for their own professional development without much support or guidance. To achieve operational excellence, development of the people in an organization is just as important as the development of technologies and processes. Ohio Health Ambulatory Division in Columbus, OH created a plan to develop its people systematically in three distinct pillars: management development, staff engagement, and clinical excellence. Much was learned about talent development since work began on "The People Plan", perhaps the most critical lesson learned has been the importance of not giving up on the effort.
Computer-aided acquisition and logistics support (CALS): Concept of Operations for Depot Maintenance
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bourgeois, N.C.; Greer, D.K.
1993-04-01
This CALS Concept of Operations for Depot Maintenance provides the foundation strategy and the near term tactical plan for CALS implementation in the depot maintenance environment. The user requirements enumerated and the overarching architecture outlined serve as the primary framework for implementation planning. The seamless integration of depot maintenance business processes and supporting information systems with the emerging global CALS environment will be critical to the efficient realization of depot user's information requirements, and as, such will be a fundamental theme in depot implementations.
NASA Astrophysics Data System (ADS)
Sherwood, R.; Mutz, D.; Estlin, T.; Chien, S.; Backes, P.; Norris, J.; Tran, D.; Cooper, B.; Rabideau, G.; Mishkin, A.; Maxwell, S.
2001-07-01
This article discusses a proof-of-concept prototype for ground-based automatic generation of validated rover command sequences from high-level science and engineering activities. This prototype is based on ASPEN, the Automated Scheduling and Planning Environment. This artificial intelligence (AI)-based planning and scheduling system will automatically generate a command sequence that will execute within resource constraints and satisfy flight rules. An automated planning and scheduling system encodes rover design knowledge and uses search and reasoning techniques to automatically generate low-level command sequences while respecting rover operability constraints, science and engineering preferences, environmental predictions, and also adhering to hard temporal constraints. This prototype planning system has been field-tested using the Rocky 7 rover at JPL and will be field-tested on more complex rovers to prove its effectiveness before transferring the technology to flight operations for an upcoming NASA mission. Enabling goal-driven commanding of planetary rovers greatly reduces the requirements for highly skilled rover engineering personnel. This in turn greatly reduces mission operations costs. In addition, goal-driven commanding permits a faster response to changes in rover state (e.g., faults) or science discoveries by removing the time-consuming manual sequence validation process, allowing rapid "what-if" analyses, and thus reducing overall cycle times.
ICD-10: from assessment to remediation to strategic opportunity.
Dugan, John K
2012-02-01
Healthcare finance teams should perform an enterprisewide assessment to determine what ICD-10 means to their organization, strategically, operationally, and financially. CFOs should strategically evaluate the impact of ICD-10 on the organization's entire financial operation. Organizations should have a contingency plan in place across all processes.
7 CFR 407.9 - Group risk plan common policy.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Agriculture for the purpose of certifying a production, processing or handling operation as organic. Code of... commodity, excluding organic farming practices, that is necessary to produce the crop that may be, but is... practice. The combination of inputs such as fertilizer, herbicide, and pesticide, and operations such as...
7 CFR 1160.215 - Assessment exemption.
Code of Federal Regulations, 2010 CFR
2010-01-01
... described in § 1160.211(a) who operates under an approved National Organic Program (NOP) (7 CFR part 205) system plan; processes only products that are eligible to be labeled as 100 percent organic under the NOP... the organic farm or organic handling operation certificate provided by a USDA-accredited certifying...
1988-03-14
focused application of decision aids. These decision aids must incorporate standardized processes, computer assisted artificial intelligence, linkage...Theater Planning. A Strategic-Operational Perspective,’ by COL MIke ,or i n Olesak, John, LTC Office of the Deputy Chief of Staff, Inteligence , U S
A Description of the DoD Test and Evaluation Process for Electronic Warfare Systems
1994-06-13
Center J-MASS Joint Modeling and Simulation System A-2 MDA Milestone Decision Authority MNS Mission Need Statement MOE Measument of Effectivenes MOP...PSYCHOLOGICAL OPERATIONS (PSYOP) Planned operations to convey selected information and indicators to foreign audiences to influence their emotions, motive
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-10
... on small businesses). Our initial plan, as the first step in the assessment process, was to interview..., and for-hire recreational fishing operations (charter and party/head boat operations)--with questions... and fishing industry interviews were completed. The commercial fisheries interviews were not begun due...
Path Planning For A Class Of Cutting Operations
NASA Astrophysics Data System (ADS)
Tavora, Jose
1989-03-01
Optimizing processing time in some contour-cutting operations requires solving the so-called no-load path problem. This problem is formulated and an approximate resolution method (based on heuristic search techniques) is described. Results for real-life instances (clothing layouts in the apparel industry) are presented and evaluated.
Managing Quality and Productivity in Aerospace and Defense
1989-11-01
subject of The VPC at Virginia Tech. The Maryland excellence. We hope they will be of value to Center for Productivity and Quality of Worklife your...Budget drives the plan • Plan drives the budget I nvolves only top management * Participation at all levels * Finance and operations imbalanced * Balance ...to create a better tend to cause us to drive the equation left-to- balance . The Planning Process discussed in right, focusing on the levels of
Manpower planning for nurse personnel.
Keaveny, T J; Hayden, R L
1978-01-01
A technique is described which can be applied to manpower planning for nurse personnel at a state or regional level. An iterative process explores the implications of alternative planning policy decision strategies intended to balance manpower supply and requirements. Impacts of the following policy alternatives are estimated: scale of operations of education institutions; interstate migration patterns; labor force participation rates; and job design of licensed practical nurse (LPN) and registered nurse (RN) positions. PMID:665883
Mission activities planning for a Hermes mission by means of AI-technology
NASA Technical Reports Server (NTRS)
Pape, U.; Hajen, G.; Schielow, N.; Mitschdoerfer, P.; Allard, F.
1993-01-01
Mission Activities Planning is a complex task to be performed by mission control centers. AI technology can offer attractive solutions to the planning problem. This paper presents the use of a new AI-based Mission Planning System for crew activity planning. Based on a HERMES servicing mission to the COLUMBUS Man Tended Free Flyer (MTFF) with complex time and resource constraints, approximately 2000 activities with 50 different resources have been generated, processed, and planned with parametric variation of operationally sensitive parameters. The architecture, as well as the performance of the mission planning system, is discussed. An outlook to future planning scenarios, the requirements, and how a system like MARS can fulfill those requirements is given.
Backward assembly planning with DFA analysis
NASA Technical Reports Server (NTRS)
Lee, Sukhan (Inventor)
1995-01-01
An assembly planning system that operates based on a recursive decomposition of assembly into subassemblies, and analyzes assembly cost in terms of stability, directionality, and manipulability to guide the generation of preferred assembly plans is presented. The planning in this system incorporates the special processes, such as cleaning, testing, labeling, etc. that must occur during the assembly, and handles nonreversible as well as reversible assembly tasks through backward assembly planning. In order to increase the planning efficiency, the system avoids the analysis of decompositions that do not correspond to feasible assembly tasks. This is achieved by grouping and merging those parts that can not be decomposable at the current stage of backward assembly planning due to the requirement of special processes and the constraint of interconnection feasibility. The invention includes methods of evaluating assembly cost in terms of the number of fixtures (or holding devices) and reorientations required for assembly, through the analysis of stability, directionality, and manipulability. All these factors are used in defining cost and heuristic functions for an AO* search for an optimal plan.
Renewable Energy Opportunity Assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hancock, Ed; Mas, Carl
1998-11-13
Presently, the US EPA is constructing a new complex at Research Triangle Park, North Carolina to consolidate its research operations in the Raleigh-Durham area. The National Computer Center (NCC) is currently in the design process and is planned for construction as part of this complex. Implementation of the new technologies can be planned as part of the normal construction process, and full credit for elimination of the conventional technologies can be taken. Several renewable technologies are specified in the current plans for the buildings. The objective of this study is to identify measures that are likely to be both technicallymore » and economically feasible.« less
Science operations planning and implementation for Rosetta
NASA Astrophysics Data System (ADS)
Koschny, Detlef; Sweeney, Mark; Montagon, Elsa; Hoofs, Raymond; van der Plas, Peter
2002-07-01
The Rosetta mission is a cornerstone mission of the Horizon 2000 programme of the European Space Agency. It will be launched to comet 46P/Wirtanen in January 2003. This mission is the first of a series of planetary missions, including Mars Express, Smart-I (to the Moon), and BepiColombo (to Mercury). All these missions have similar requirements for their scientific operations. The Experiments H/W and S/W are developed by Principal Investigators, working at scientific institutes. They are also responsible for the operation of their experiments and for the generation of related operational documentation. The Science Operations Centre (SOC) has the task to consolidate the inputs of the different experimenters and the Lander and ensure that the resulting science operations timeline is free of conflicts. It forwards this timeline to the Mission Operations Centre (MOC) which combines the science operations with the operations of the other spacecraft subsystems and the orbit and attitude of the spacecraft. The MOC is also responsible for uplinking the operational command sequences to the spacecraft and for returning the received telemetry to the user. In a collaboration between the team of the Rosetta Project Scientist at the Research and Science Support Department of ESA/ESTEC and the European Space Operations Centre (ESA/ESOC), a concept for the SOC/MOC and their interfaces was developed for the Rosetta mission. This concept is generic enough to allow its implementation also for the other planetary missions. The design phase is now complete, and implementation is on-going. This paper briefly presents the architecture of the complex ground segment, concentrating on the elements required for planning of scientific operations, and then details the software tools EPS (Experiment Planning System) and PTB (Project Test Bed) which are used in the planning process.
DARHT: INTEGRATION OF AUTHORIZATION BASIS REQUIREMENTS AND WORKER SAFETY
DOE Office of Scientific and Technical Information (OSTI.GOV)
D. A. MC CLURE; C. A. NELSON; R. L. BOUDRIE
2001-04-01
This document describes the results of consensus agreements reached by the DARHT Safety Planning Team during the development of the update of the DARHT Safety Analysis Document (SAD). The SAD is one of the Authorization Basis (AB) Documents required by the Department prior to granting approval to operate the DARHT Facility. The DARHT Safety Planning Team is lead by Mr. Joel A. Baca of the Department of Energy Albuquerque Operations Office (DOE/AL). Team membership is drawn from the Department of Energy Albuquerque Operations Office, the Department of Energy Los Alamos Area Office (DOE/LAAO), and several divisions of the Los Alamosmore » National Laboratory. Revision 1 of the DARHT SAD had been written as part of the process for gaining approval to operate the Phase 1 (First Axis) Accelerator. Early in the planning stage for the required update of the SAD for the approval to operate both Phase 1 and Phase 2 (First Axis and Second Axis) DARHT Accelerator, it was discovered that a conflict existed between the Laboratory approach to describing the management of facility and worker safety.« less
NASA Technical Reports Server (NTRS)
1973-01-01
The Mariner Mars 1971 mission which was another step in the continuing program of planetary exploration in search of evidence of exobiological activity, information on the origin and evolution of the solar system, and basic science data related to the study of planetary physics, geology, planetology, and cosmology is reported. The mission plan was designed for two spacecraft, each performing a separate but complementary mission. However, a single mission plan was actually used for Mariner 9 because of failure of the launch vehicle for the first spacecraft. The implementation is described, of the Mission Operations System, including organization, training, and data processing development and operations, and Mariner 9 spacecraft cruise and orbital operations through completion of the standard mission from launch to solar occultation in April 1972 are discussed.
NASA Technical Reports Server (NTRS)
Jaap, John; Muery, Kim
2000-01-01
Scheduling engines are found at the core of software systems that plan and schedule activities and resources. A Request-Oriented Scheduling Engine (ROSE) is one that processes a single request (adding a task to a timeline) and then waits for another request. For the International Space Station, a robust ROSE-based system would support multiple, simultaneous users, each formulating requests (defining scheduling requirements), submitting these requests via the internet to a single scheduling engine operating on a single timeline, and immediately viewing the resulting timeline. ROSE is significantly different from the engine currently used to schedule Space Station operations. The current engine supports essentially one person at a time, with a pre-defined set of requirements from many payloads, working in either a "batch" scheduling mode or an interactive/manual scheduling mode. A planning and scheduling process that takes advantage of the features of ROSE could produce greater customer satisfaction at reduced cost and reduced flow time. This paper describes a possible ROSE-based scheduling process and identifies the additional software component required to support it. Resulting changes to the management and control of the process are also discussed.
Rural watershed partnerships: lessons from West Virginia
Steve W. Selin; Alan Collins; Susan Hunter
1998-01-01
The goal of this study is to examine the efforts by one state government (West Virginia) to facilitate collaborative, watershed-based planning. This paper provides an overview of the state watershed planning process and includes a summary of a baseline study of rural watershed partnerships operating within West Virginia. Implication of the study for state policies and...
NASA Technical Reports Server (NTRS)
Callender, E. David; Steinbacher, Jody
1989-01-01
This is the second of five volumes of the Information System Life-Cycle and Documentation Standards. This volume provides a well-organized, easily used standard for management plans used in acquiring, assuring, and developing information systems and software, hardware, and operational procedures components, and related processes.
Jeffrey S. Evans; Andrew T. Hudak; Russ Faux; Alistair M. S. Smith
2009-01-01
Recent years have seen the progression of light detection and ranging (lidar) from the realm of research to operational use in natural resource management. Numerous government agencies, private industries, and public/private stakeholder consortiums are planning or have recently acquired large-scale acquisitions, and a national U.S. lidar acquisition is likely before...
ERIC Educational Resources Information Center
Wholeben, Brent Edward
A rationale is presented for viewing the decision-making process inherent in determining budget reductions for educational programs as most effectively modeled by a graduated funding approach. The major tenets of the graduated budget reduction approach to educational fiscal policy include the development of multiple alternative reduction plans, or…
Business intelligence modeling in launch operations
NASA Astrophysics Data System (ADS)
Bardina, Jorge E.; Thirumalainambi, Rajkumar; Davis, Rodney D.
2005-05-01
The future of business intelligence in space exploration will focus on the intelligent system-of-systems real-time enterprise. In present business intelligence, a number of technologies that are most relevant to space exploration are experiencing the greatest change. Emerging patterns of set of processes rather than organizational units leading to end-to-end automation is becoming a major objective of enterprise information technology. The cost element is a leading factor of future exploration systems. This technology project is to advance an integrated Planning and Management Simulation Model for evaluation of risks, costs, and reliability of launch systems from Earth to Orbit for Space Exploration. The approach builds on research done in the NASA ARC/KSC developed Virtual Test Bed (VTB) to integrate architectural, operations process, and mission simulations for the purpose of evaluating enterprise level strategies to reduce cost, improve systems operability, and reduce mission risks. The objectives are to understand the interdependency of architecture and process on recurring launch cost of operations, provide management a tool for assessing systems safety and dependability versus cost, and leverage lessons learned and empirical models from Shuttle and International Space Station to validate models applied to Exploration. The systems-of-systems concept is built to balance the conflicting objectives of safety, reliability, and process strategy in order to achieve long term sustainability. A planning and analysis test bed is needed for evaluation of enterprise level options and strategies for transit and launch systems as well as surface and orbital systems. This environment can also support agency simulation based acquisition process objectives. The technology development approach is based on the collaborative effort set forth in the VTB's integrating operations, process models, systems and environment models, and cost models as a comprehensive disciplined enterprise analysis environment. Significant emphasis is being placed on adapting root cause from existing Shuttle operations to exploration. Technical challenges include cost model validation, integration of parametric models with discrete event process and systems simulations, and large-scale simulation integration. The enterprise architecture is required for coherent integration of systems models. It will also require a plan for evolution over the life of the program. The proposed technology will produce long-term benefits in support of the NASA objectives for simulation based acquisition, will improve the ability to assess architectural options verses safety/risk for future exploration systems, and will facilitate incorporation of operability as a systems design consideration, reducing overall life cycle cost for future systems.
Business Intelligence Modeling in Launch Operations
NASA Technical Reports Server (NTRS)
Bardina, Jorge E.; Thirumalainambi, Rajkumar; Davis, Rodney D.
2005-01-01
This technology project is to advance an integrated Planning and Management Simulation Model for evaluation of risks, costs, and reliability of launch systems from Earth to Orbit for Space Exploration. The approach builds on research done in the NASA ARC/KSC developed Virtual Test Bed (VTB) to integrate architectural, operations process, and mission simulations for the purpose of evaluating enterprise level strategies to reduce cost, improve systems operability, and reduce mission risks. The objectives are to understand the interdependency of architecture and process on recurring launch cost of operations, provide management a tool for assessing systems safety and dependability versus cost, and leverage lessons learned and empirical models from Shuttle and International Space Station to validate models applied to Exploration. The systems-of-systems concept is built to balance the conflicting objectives of safety, reliability, and process strategy in order to achieve long term sustainability. A planning and analysis test bed is needed for evaluation of enterprise level options and strategies for transit and launch systems as well as surface and orbital systems. This environment can also support agency simulation .based acquisition process objectives. The technology development approach is based on the collaborative effort set forth in the VTB's integrating operations. process models, systems and environment models, and cost models as a comprehensive disciplined enterprise analysis environment. Significant emphasis is being placed on adapting root cause from existing Shuttle operations to exploration. Technical challenges include cost model validation, integration of parametric models with discrete event process and systems simulations. and large-scale simulation integration. The enterprise architecture is required for coherent integration of systems models. It will also require a plan for evolution over the life of the program. The proposed technology will produce long-term benefits in support of the NASA objectives for simulation based acquisition, will improve the ability to assess architectural options verses safety/risk for future exploration systems, and will facilitate incorporation of operability as a systems design consideration, reducing overall life cycle cost for future systems. The future of business intelligence of space exploration will focus on the intelligent system-of-systems real-time enterprise. In present business intelligence, a number of technologies that are most relevant to space exploration are experiencing the greatest change. Emerging patterns of set of processes rather than organizational units leading to end-to-end automation is becoming a major objective of enterprise information technology. The cost element is a leading factor of future exploration systems.
Environmental scanning for Social Services.
Russell, S; Prince, M J
1992-10-01
This article describes the development of a process of systematic regional environmental scanning as part of strategic planning in the Ministry of Social Services (MSS) in British Columbia, over the 1987-1990 period. Social Services, a large regionalized social service organization, adopted a formal strategic planning process in early 1988. Ministry services are delivered in ten regions with widely varying characteristics. To ensure that this diversity is reflected in the planning process, it is essential that regional environmental information receive consideration. A simple format was developed and regional directors asked to consult with their staff and to scan their regions for issues that may impact the ministry over the medium term. The information obtained was presented by regional directors at a Senior Management Committee meeting and included in the ministry's annual Business Plan, a document which informs staff, contractors, stakeholders, and the community at large of the ministry's values, objectives, and operational goals. The inclusion of regional analyses adds useful information to the Plan. A second output of the planning process is the ministry budget. The systematic regional scans were found to be extremely useful to regional staff, other directors, and to the ministry executives while setting priorities.
Inpatient Dialysis Unit Project Development: Redesigning Acute Hemodialysis Care.
Day, Jennifer
2017-01-01
Executive leaders of an acute care hospital performed a market and financial analysis, and created a business plan to establish an inpatient hemodialysis unit operated by the hospital to provide safe, high-quality, evidence-based care to the population of individuals experiencing end stage renal disease (ESRD) within the community. The business plan included a SWOT (Strengths - Weaknesses - Opportunities - Threats) analysis to assess advantages of the hospital providing inpatient hemodialysis services versus outsourcing the services with a contracted agency. The results of the project were a newly constructed tandem hemodialysis room and an operational plan with clearly defined key performance indicators, process improvement initiatives, and financial goals. This article provides an overview of essential components of a business plan to guide the establishment of an inpatient hemodialysis unit. Copyright© by the American Nephrology Nurses Association.
CPAS Preflight Drop Test Analysis Process
NASA Technical Reports Server (NTRS)
Englert, Megan E.; Bledsoe, Kristin J.; Romero, Leah M.
2015-01-01
Throughout the Capsule Parachute Assembly System (CPAS) drop test program, the CPAS Analysis Team has developed a simulation and analysis process to support drop test planning and execution. This process includes multiple phases focused on developing test simulations and communicating results to all groups involved in the drop test. CPAS Engineering Development Unit (EDU) series drop test planning begins with the development of a basic operational concept for each test. Trajectory simulation tools include the Flight Analysis and Simulation Tool (FAST) for single bodies, and the Automatic Dynamic Analysis of Mechanical Systems (ADAMS) simulation for the mated vehicle. Results are communicated to the team at the Test Configuration Review (TCR) and Test Readiness Review (TRR), as well as at Analysis Integrated Product Team (IPT) meetings in earlier and intermediate phases of the pre-test planning. The ability to plan and communicate efficiently with rapidly changing objectives and tight schedule constraints is a necessity for safe and successful drop tests.
Developing a strategic plan for a neonatal nurse practitioner service.
Lee, Laurie A; Jones, Luann R
2004-10-01
Neonatal nurse practitioners (NNPs) have been in practice for over 3 decades. More recently, NNPs have begun to take ownership for building their group practice models. The purpose of this article is to present a detailed case study demonstrating how one NNP group used a 4-phase strategic planning process to turn a crisis into an opportunity. The article describes data obtained during the strategic planning process from an informal national survey of NNP managers that focused on key benchmarks, such as role definition, responsibilities, protected nonclinical time, NNP salary and benefits, and educational and professional development support. Using the strategic planning process, the group defined mutually agreed upon minimum safe staffing levels for NNPs, interns, residents and neonatologists in their setting. Based on the data generated, the group successfully justified additional NNP positions and organizational support for 10% protected nonclinical time. A sample operational budget, comparison of 3 staffing scenarios, and a timeline are also provided.
KSC facilities status and planned management operations. [for Shuttle launches
NASA Technical Reports Server (NTRS)
Gray, R. H.; Omalley, T. J.
1979-01-01
A status report is presented on facilities and planned operations at the Kennedy Space Center with reference to Space Shuttle launch activities. The facilities are essentially complete, with all new construction and modifications to existing buildings almost finished. Some activity is still in progress at Pad A and on the Mobile Launcher due to changes in requirements but is not expected to affect the launch schedule. The installation and testing of the ground checkout equipment that will be used to test the flight hardware is now in operation. The Launch Processing System is currently supporting the development of the applications software that will perform the testing of this flight hardware.
STS operations planning - Current status and outlook for the future
NASA Technical Reports Server (NTRS)
Lee, C. M.
1981-01-01
Consideration is given to the status of Space Shuttle operations planning and outlook for the period 1982-94, with some speculations on Shuttle-related space operations early in the next century. Attention is given to the evolution of Shuttle payload capabilities over the next five years. The following list of near-earth environment factors to be exploited by the Space Shuttle is given: (1) easy control of gravity; (2) absence of atmosphere; (3) a comprehensive view of the earth's surface and atmosphere; (4) isolation of hazardous processes from earth biosphere; (5) freely available light, heat and photovoltaic power; (6) an infinite natural reservoir for the disposal of radioactive waste products; and (7) a super-cold heat sink.
Mbembati, Naboth A; Mwangu, Mugwira; Muhondwa, Eustace P Y; Leshabari, Melkizedek M
2008-04-01
Muhimbili National Hospital (MNH), a teaching and national referral hospital, is undergoing major reforms to improve the quality of health care. We performed a retrospective descriptive study using a set of performance indicators for the surgical and laboratory services of MNH in years 2001 and 2002, to help monitor and evaluate the impact of reforms on the quality of health care during and after the reform process. Hospital records were reviewed and information recorded for planned and postponed operations, laboratory equipment, reagents, laboratory tests and quality assurance programmes. In the year 2001 a total of 4332 non-emergency operations were planned, 3313 operations were performed and 1019 (23.5%) operations were postponed. In the year 2002, 4301 non-emergency operations were planned, 3046 were performed and 1255 (29%) were postponed. The most common reasons for operation postponement were "time-barred", interference by emergency operations, no show of patients and inoperable anaesthetic machines. Equipment problems and supply and staff shortages together accounted for one quarter of postponements. In the laboratory, a lack of equipment prevented some tests, but quality assurance was performed for most tests. Current surgical services at MNH are inadequate; operating theatres require modern, functioning equipment and adequate supplies of consumables to provide satisfactory care.
Backward assembly planning with DFA analysis
NASA Technical Reports Server (NTRS)
Lee, Sukhan (Inventor)
1992-01-01
An assembly planning system that operates based on a recursive decomposition of assembly into subassemblies is presented. The planning system analyzes assembly cost in terms of stability, directionality, and manipulability to guide the generation of preferred assembly plans. The planning in this system incorporates the special processes, such as cleaning, testing, labeling, etc., that must occur during the assembly. Additionally, the planning handles nonreversible, as well as reversible, assembly tasks through backward assembly planning. In order to decrease the planning efficiency, the system avoids the analysis of decompositions that do not correspond to feasible assembly tasks. This is achieved by grouping and merging those parts that can not be decomposable at the current stage of backward assembly planning due to the requirement of special processes and the constraint of interconnection feasibility. The invention includes methods of evaluating assembly cost in terms of the number of fixtures (or holding devices) and reorientations required for assembly, through the analysis of stability, directionality, and manipulability. All these factors are used in defining cost and heuristic functions for an AO* search for an optimal plan.
76 FR 34745 - Delegation of Authority to the Chief Operating Officer
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-14
... Information Act processing, budgeting, accounting, hiring and training employees, modernizing information... strategic planning, and performance management and measurement. Section B. Authority Excepted The authority...
DBMS UTILIZATION: A Corporate Information System (CIS) development approach
NASA Technical Reports Server (NTRS)
Rozett, P.
1983-01-01
The Corporate Information System (CIS), an integrated information system intended to tie the corporation together as a functioning entity, is described. In addition to being a major upgraded automated data processing system, the CIS is a management philosophy which recognizes data as a valuable corporate resource and which distinguishes between data and selected data, or information. It further recognizes that different users need different kinds of information. Plans for CIS development are discussed. It will offer its users not just after-the-fact data, but timely information in a format that is meaningful and useful to the particular user, so that the information can be applied in planning, controlling, and decision making by all levels of management. In effect, CIS will help the corporation itself to function as a total, integrated system by typing together administrative activities through information exchange. The CIS supports the operational, tactical control, and strategic planning functions of the corporation. Operational functions are the day-to-day processing necessary to support the corporation's work, such as purchasing and payroll.
45 CFR 205.37 - Responsibilities of the Administration for Children and Families (ACF).
Code of Federal Regulations, 2012 CFR
2012-10-01
... Application Processing and Information Retrieval System Guide. The initial advance automatic data processing... description of the proposed statewide management system, including the description of information flows, input..., review, assess, and inspect the planning, design, and operation of, statewide management information...
45 CFR 205.37 - Responsibilities of the Administration for Children and Families (ACF).
Code of Federal Regulations, 2011 CFR
2011-10-01
... Application Processing and Information Retrieval System Guide. The initial advance automatic data processing... description of the proposed statewide management system, including the description of information flows, input..., review, assess, and inspect the planning, design, and operation of, statewide management information...
Nurse-Managed Clinics: A Blueprint for Success Using the Covey Framework.
ERIC Educational Resources Information Center
Starck, Patricia L.; And Others
1995-01-01
Describes the process from inception to successful operation of a university-based, nurse-managed clinic, based on Covey's seven habits of highly effective people. Includes information on the planning process, financing, political strategies for gaining approval, and ongoing development of services. (JOW)
Infusion of innovative technologies for mission operations
NASA Astrophysics Data System (ADS)
Donati, Alessandro
2010-11-01
The Advanced Mission Concepts and Technologies Office (Mission Technologies Office, MTO for short) at the European Space Operations Centre (ESOC) of ESA is entrusted with research and development of innovative mission operations concepts systems and provides operations support to special projects. Visions of future missions and requests for improvements from currently flying missions are the two major sources of inspiration to conceptualize innovative or improved mission operations processes. They include monitoring and diagnostics, planning and scheduling, resource management and optimization. The newly identified operations concepts are then proved by means of prototypes, built with embedded, enabling technology and deployed as shadow applications in mission operations for an extended validation phase. The technology so far exploited includes informatics, artificial intelligence and operational research branches. Recent outstanding results include artificial intelligence planning and scheduling applications for Mars Express, advanced integrated space weather monitoring system for the Integral space telescope and a suite of growing client applications for MUST (Mission Utilities Support Tools). The research, development and validation activities at the Mission technologies office are performed together with a network of research institutes across Europe. The objective is narrowing the gap between enabling and innovative technology and space mission operations. The paper first addresses samples of technology infusion cases with their lessons learnt. The second part is focused on the process and the methodology used at the Mission technologies office to fulfill its objectives.
The Role of Structural Models in the Solar Sail Flight Validation Process
NASA Technical Reports Server (NTRS)
Johnston, John D.
2004-01-01
NASA is currently soliciting proposals via the New Millennium Program ST-9 opportunity for a potential Solar Sail Flight Validation (SSFV) experiment to develop and operate in space a deployable solar sail that can be steered and provides measurable acceleration. The approach planned for this experiment is to test and validate models and processes for solar sail design, fabrication, deployment, and flight. These models and processes would then be used to design, fabricate, and operate scaleable solar sails for future space science missions. There are six validation objectives planned for the ST9 SSFV experiment: 1) Validate solar sail design tools and fabrication methods; 2) Validate controlled deployment; 3) Validate in space structural characteristics (focus of poster); 4) Validate solar sail attitude control; 5) Validate solar sail thrust performance; 6) Characterize the sail's electromagnetic interaction with the space environment. This poster presents a top-level assessment of the role of structural models in the validation process for in-space structural characteristics.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thrower, A.W.; Patric, J.; Keister, M.
2008-07-01
The purpose of the Office of Civilian Radioactive Waste Management's (OCRWM) Logistics Benchmarking Project is to identify established government and industry practices for the safe transportation of hazardous materials which can serve as a yardstick for design and operation of OCRWM's national transportation system for shipping spent nuclear fuel and high-level radioactive waste to the proposed repository at Yucca Mountain, Nevada. The project will present logistics and transportation practices and develop implementation recommendations for adaptation by the national transportation system. This paper will describe the process used to perform the initial benchmarking study, highlight interim findings, and explain how thesemore » findings are being implemented. It will also provide an overview of the next phase of benchmarking studies. The benchmarking effort will remain a high-priority activity throughout the planning and operational phases of the transportation system. The initial phase of the project focused on government transportation programs to identify those practices which are most clearly applicable to OCRWM. These Federal programs have decades of safe transportation experience, strive for excellence in operations, and implement effective stakeholder involvement, all of which parallel OCRWM's transportation mission and vision. The initial benchmarking project focused on four business processes that are critical to OCRWM's mission success, and can be incorporated into OCRWM planning and preparation in the near term. The processes examined were: transportation business model, contract management/out-sourcing, stakeholder relations, and contingency planning. More recently, OCRWM examined logistics operations of AREVA NC's Business Unit Logistics in France. The next phase of benchmarking will focus on integrated domestic and international commercial radioactive logistic operations. The prospective companies represent large scale shippers and have vast experience in safely and efficiently shipping spent nuclear fuel and other radioactive materials. Additional business processes may be examined in this phase. The findings of these benchmarking efforts will help determine the organizational structure and requirements of the national transportation system. (authors)« less
Automated planning for intelligent machines in energy-related applications
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weisbin, C.R.; de Saussure, G.; Barhen, J.
1984-01-01
This paper discusses the current activities of the Center for Engineering Systems Advanced Research (CESAR) program related to plan generation and execution by an intelligent machine. The system architecture for the CESAR mobile robot (named HERMIES-1) is described. The minimal cut-set approach is developed to reduce the tree search time of conventional backward chaining planning techniques. Finally, a real-time concept of an Intelligent Machine Operating System is presented in which planning and reasoning is embedded in a system for resource allocation and process management.
WFIRST: STScI Science Operations Center (SSOC) Activities and Plans
NASA Astrophysics Data System (ADS)
Gilbert, Karoline M.; STScI WFIRST Team
2018-01-01
The science operations for the WFIRST Mission will be distributed between Goddard Space Flight Center, the Space Telescope Science Institute (STScI), and the Infrared Processing and Analysis Center (IPAC). The STScI Science Operations Center (SSOC) will schedule and archive all WFIRST observations, will calibrate and produce pipeline-reduced data products for the Wide Field Instrument, and will support the astronomical community in planning WFI observations and analyzing WFI data. During the formulation phase, WFIRST team members at STScI have developed operations concepts for scheduling, data management, and the archive; have performed technical studies investigating the impact of WFIRST design choices on data quality and analysis; and have built simulation tools to aid the community in exploring WFIRST’s capabilities. We will highlight examples of each of these efforts.
Tug fleet and ground operations schedules and controls. Volume 3: Program cost estimates
NASA Technical Reports Server (NTRS)
1975-01-01
Cost data for the tug DDT&E and operations phases are presented. Option 6 is the recommended option selected from seven options considered and was used as the basis for ground processing estimates. Option 6 provides for processing the tug in a factory clean environment in the low bay area of VAB with subsequent cleaning to visibly clean. The basis and results of the trade study to select Option 6 processing plan is included. Cost estimating methodology, a work breakdown structure, and a dictionary of WBS definitions is also provided.
Orion Pad Abort 1 Flight Test - Ground and Flight Operations
NASA Technical Reports Server (NTRS)
Hackenbergy, Davis L.; Hicks, Wayne
2011-01-01
This paper discusses the ground and flight operations aspects to the Pad Abort 1 launch. The paper details the processes used to plan all operations. The paper then discussions the difficulties of integration and testing, while detailing some of the lessons learned throughout the entire launch campaign. Flight operational aspects of the launc are covered in order to provide the listener with the full suite of operational issues encountered in preparation for the first flight test of the Orion Launch Abort System.
Planning Mediates Between Self-Efficacy and Physical Activity Among Motivated Young Adults.
Zhou, Guangyu; Wang, Dongmei; Knoll, Nina; Schwarzer, Ralf
2016-01-01
Often, motivation to be physically active is a necessary precondition of action but still does not suffice to initiate the target behavior. Instead, motivation needs to be translated into action by a self-regulatory process. Self-efficacy and planning are considered to be useful constructs that help to facilitate such translations. The aim is to examine the roles of motivation, planning, and self-efficacy as well as the mechanisms that operate in the change of physical activity levels. In a longitudinal observation study with 249 young adults, self-efficacy, planning, motivation, and physical activity were assessed at 2 points in time, 3 months apart. Planning served as a mediator between self-efficacy and physical activity, controlling for baseline activity. In addition to this indirect effect, a moderator effect was found between self-efficacy and stages of change on planning. The mediation operated only in motivated, but not in unmotivated students. A mediation from self-efficacy via planning to physical activity seems to be likely only when people are motivated to become more active.
Visual Decision Support Tool for Supporting Asset ...
Abstract:Managing urban water infrastructures faces the challenge of jointly dealing with assets of diverse types, useful life, cost, ages and condition. Service quality and sustainability require sound long-term planning, well aligned with tactical and operational planning and management. In summary, the objective of an integrated approach to infrastructure asset management is to assist utilities answer the following questions:•Who are we at present?•What service do we deliver?•What do we own?•Where do we want to be in the long-term?•How do we get there?The AWARE-P approach (www.aware-p.org) offers a coherent methodological framework and a valuable portfolio of software tools. It is designed to assist water supply and wastewater utility decision-makers in their analyses and planning processes. It is based on a Plan-Do-Check-Act process and is in accordance with the key principles of the International Standards Organization (ISO) 55000 standards on asset management. It is compatible with, and complementary to WERF’s SIMPLE framework. The software assists in strategic, tactical, and operational planning, through a non-intrusive, web-based, collaborative environment where objectives and metrics drive IAM planning. It is aimed at industry professionals and managers, as well as at the consultants and technical experts that support them. It is easy to use and maximizes the value of information from multiple existing data sources, both in da
Matrix evaluation of science objectives
NASA Technical Reports Server (NTRS)
Wessen, Randii R.
1994-01-01
The most fundamental objective of all robotic planetary spacecraft is to return science data. To accomplish this, a spacecraft is fabricated and built, software is planned and coded, and a ground system is designed and implemented. However, the quantitative analysis required to determine how the collection of science data drives ground system capabilities has received very little attention. This paper defines a process by which science objectives can be quantitatively evaluated. By applying it to the Cassini Mission to Saturn, this paper further illustrates the power of this technique. The results show which science objectives drive specific ground system capabilities. In addition, this process can assist system engineers and scientists in the selection of the science payload during pre-project mission planning; ground system designers during ground system development and implementation; and operations personnel during mission operations.
The key to successful management of STS operations: An integrated production planning system
NASA Technical Reports Server (NTRS)
Johnson, W. A.; Thomasen, C. T.
1985-01-01
Space Transportation System operations managers are being confronted with a unique set of challenges as a result of increasing flight rates, the demand for flight manifest/production schedule flexibility and an emphasis on continued cost reduction. These challenges have created the need for an integrated production planning system that provides managers with the capability to plan, schedule, status and account for an orderly flow of products and services across a large, multi-discipline organization. With increased visibility into the end-to-end production flow for individual and parallel missions in process, managers can assess the integrated impact of changes, identify and measure the interrelationships of resource, schedule, and technical performance requirements and prioritize productivity enhancements.
Auspice: Automatic Service Planning in Cloud/Grid Environments
NASA Astrophysics Data System (ADS)
Chiu, David; Agrawal, Gagan
Recent scientific advances have fostered a mounting number of services and data sets available for utilization. These resources, though scattered across disparate locations, are often loosely coupled both semantically and operationally. This loosely coupled relationship implies the possibility of linking together operations and data sets to answer queries. This task, generally known as automatic service composition, therefore abstracts the process of complex scientific workflow planning from the user. We have been exploring a metadata-driven approach toward automatic service workflow composition, among other enabling mechanisms, in our system, Auspice: Automatic Service Planning in Cloud/Grid Environments. In this paper, we present a complete overview of our system's unique features and outlooks for future deployment as the Cloud computing paradigm becomes increasingly eminent in enabling scientific computing.
Automated Data Assimilation and Flight Planning for Multi-Platform Observation Missions
NASA Technical Reports Server (NTRS)
Oza, Nikunj; Morris, Robert A.; Strawa, Anthony; Kurklu, Elif; Keely, Leslie
2008-01-01
This is a progress report on an effort in which our goal is to demonstrate the effectiveness of automated data mining and planning for the daily management of Earth Science missions. Currently, data mining and machine learning technologies are being used by scientists at research labs for validating Earth science models. However, few if any of these advanced techniques are currently being integrated into daily mission operations. Consequently, there are significant gaps in the knowledge that can be derived from the models and data that are used each day for guiding mission activities. The result can be sub-optimal observation plans, lack of useful data, and wasteful use of resources. Recent advances in data mining, machine learning, and planning make it feasible to migrate these technologies into the daily mission planning cycle. We describe the design of a closed loop system for data acquisition, processing, and flight planning that integrates the results of machine learning into the flight planning process.
40 CFR 270.24 - Specific part B information requirements for process vents.
Code of Federal Regulations, 2010 CFR
2010-07-01
...., identify the hazardous waste management units on a facility plot plan). (2) Information and data supporting... concentrations) that represent the conditions that exist when the waste management unit is operating at the... when the hazardous waste management unit is or would be operating at the highest load or capacity level...
Supporting Studies on QDRI Project Plan. Report No. 2. Conversion Procedures for Automation.
ERIC Educational Resources Information Center
Peirce, James G.; And Others
This report describes the tasks and related efforts necessary to convert the present Qualitative Developments Requirements Information (QDRI) Program from a clerical operation into an automated information processing system. A description of the QDRI Program is presented whereby current operations, files, procedures, etc. are contrasted to planned…
Data Elements for Workload Analysis of Armored Vehicle Crews
1990-09-01
weapon status, terrain, enemy, etc.) and 2) managing the operation of the various mental processes through which the operator interacts with the...contrive, or plan a process or procedure for carrying out a tactical action. DICTATE - To speak aloud into a recorder. DIRECT - To manage the action of...To mark or note on a map or chart; to locate by means of coordinates. POSITION - To place oneself or others in a location or posture. PREPARE - To
Three-dimensional surgical simulation.
Cevidanes, Lucia H C; Tucker, Scott; Styner, Martin; Kim, Hyungmin; Chapuis, Jonas; Reyes, Mauricio; Proffit, William; Turvey, Timothy; Jaskolka, Michael
2010-09-01
In this article, we discuss the development of methods for computer-aided jaw surgery, which allows us to incorporate the high level of precision necessary for transferring virtual plans into the operating room. We also present a complete computer-aided surgery system developed in close collaboration with surgeons. Surgery planning and simulation include construction of 3-dimensional surface models from cone-beam computed tomography, dynamic cephalometry, semiautomatic mirroring, interactive cutting of bone, and bony segment repositioning. A virtual setup can be used to manufacture positioning splints for intraoperative guidance. The system provides further intraoperative assistance with a computer display showing jaw positions and 3-dimensional positioning guides updated in real time during the surgical procedure. The computer-aided surgery system aids in dealing with complex cases with benefits for the patient, with surgical practice, and for orthodontic finishing. Advanced software tools for diagnosis and treatment planning allow preparation of detailed operative plans, osteotomy repositioning, bone reconstructions, surgical resident training, and assessing the difficulties of the surgical procedures before the surgery. Computer-aided surgery can make the elaboration of the surgical plan a more flexible process, increase the level of detail and accuracy of the plan, yield higher operative precision and control, and enhance documentation of cases. 2010 American Association of Orthodontists. Published by Mosby, Inc. All rights reserved.
Sànchez-Marrè, Miquel; Gilbert, Karina; Sojda, Rick S.; Steyer, Jean Philippe; Struss, Peter; Rodríguez-Roda, Ignasi; Voinov, A.A.; Jakeman, A.J.; Rizzoli, A.E.
2006-01-01
There are inherent open problems arising when developing and running Intelligent Environmental Decision Support Systems (IEDSS). During daily operation of IEDSS several open challenge problems appear. The uncertainty of data being processed is intrinsic to the environmental system, which is being monitored by several on-line sensors and off-line data. Thus, anomalous data values at data gathering level or even uncertain reasoning process at later levels such as in diagnosis or decision support or planning can lead the environmental process to unsafe critical operation states. At diagnosis level or even at decision support level or planning level, spatial reasoning or temporal reasoning or both aspects can influence the reasoning processes undertaken by the IEDSS. Most of Environmental systems must take into account the spatial relationships between the environmental goal area and the nearby environmental areas and the temporal relationships between the current state and the past states of the environmental system to state accurate and reliable assertions to be used within the diagnosis process or decision support process or planning process. Finally, a related issue is a crucial point: are really reliable and safe the decisions proposed by the IEDSS? Are we sure about the goodness and performance of proposed solutions? How can we ensure a correct evaluation of the IEDSS? Main goal of this paper is to analyse these four issues, review some possible approaches and techniques to cope with them, and study new trends for future research within the IEDSS field.
Room To Grow? Facilities Programming for Colleges and Universities.
ERIC Educational Resources Information Center
Thompson, Roger; Adams, Tom
2001-01-01
Asserts that campus space needs could be remedied by moving centrally located service delivery organizations, such as fleet vehicle maintenance facilities. Describes the process of operational and space needs assessment; this process provides information that enables architects to plan for appropriate adjacencies, correct space allocation, and…
Autoplan: A self-processing network model for an extended blocks world planning environment
NASA Technical Reports Server (NTRS)
Dautrechy, C. Lynne; Reggia, James A.; Mcfadden, Frank
1990-01-01
Self-processing network models (neural/connectionist models, marker passing/message passing networks, etc.) are currently undergoing intense investigation for a variety of information processing applications. These models are potentially very powerful in that they support a large amount of explicit parallel processing, and they cleanly integrate high level and low level information processing. However they are currently limited by a lack of understanding of how to apply them effectively in many application areas. The formulation of self-processing network methods for dynamic, reactive planning is studied. The long-term goal is to formulate robust, computationally effective information processing methods for the distributed control of semiautonomous exploration systems, e.g., the Mars Rover. The current research effort is focusing on hierarchical plan generation, execution and revision through local operations in an extended blocks world environment. This scenario involves many challenging features that would be encountered in a real planning and control environment: multiple simultaneous goals, parallel as well as sequential action execution, action sequencing determined not only by goals and their interactions but also by limited resources (e.g., three tasks, two acting agents), need to interpret unanticipated events and react appropriately through replanning, etc.
Science Planning Implementation and Challenges for the ExoMars Trace Gas Orbiter
NASA Astrophysics Data System (ADS)
Ashman, Mike; Cardesin Moinelo, Alejandro; Frew, David; Garcia Beteta, Juan Jose; Geiger, Bernhard; Metcalfe, Leo; Muñoz, Michela; Nespoli, Federico
2018-05-01
The ExoMars Science Operations Centre (SOC) is located at ESA's European Space Astronomy Centre (ESAC) in Madrid, Spain and is responsible for coordinating the science planning activities for TGO in order to optimize the scientific return of the mission. The SOC constructs, in accordance with Science Working Team (SWT) science priorities, and in coordination with the PI science teams and ESA's Mission Operations Centre (MOC), a plan of scientific observations and delivers conflict free operational products for uplink and execution on-board. To achieve this, the SOC employs a planning concept based on Long, Medium and Short Term planning cycles. Long Term planning covers mission segments of several months and is conducted many months prior to execution. Its goal is to establish a feasible science observation strategy given the science priorities and the expected mission profile. Medium Term planning covers a 1 month mission segment and is conducted from 3 to 2 months prior to execution whilst Short Term planning covers a 1 week segment and is conducted from 2 weeks to 1 week prior to execution. The goals of Medium and Short Term planning are to operationally instantiate and validate the Long Term plan such that the SOC may deliver to MOC a conflict free spacecraft pointing profile request (a Medium Term planning deliverable), and the final instrument telecommanding products (a Short Term planning deliverable) such that the science plan is achieved and all operational constraints are met. With a 2 hour-400km science orbit, the vast number of solar occultation, nadir measurement, and surface imaging opportunities, combined with additional mission constraints such as the necessary provision of TGO communication slots to support the ExoMars 2020 Rover & Surface Platform mission and NASA surface assets, creates a science planning task of considerable magnitude and complexity. In this paper, we detail how the SOC is developing and implementing the necessary planning infrastructure, processes and automation in order to support science planning of this scale throughout the TGO mission. We also detail how the re-use and further development of ESA's multi-mission planning software tool is being implemented in order to provide the necessary additional functionality for the SOC's planning team to exploit, and to therefore ensure the optimum scientific return of the TGO mission. Finally, we provide an overview and status of the real science planning activities taking place in the first weeks of the nominal science phase in the first half of 2018.
Pacific Northwest National Laboratory’s Climate Resiliency Planning Process and Lessons Learned
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fowler, Kimberly M.; Judd, Kathleen S.; Brandenberger, Jill M.
2016-02-22
In 2015, the Pacific Northwest National Laboratory (PNNL) developed its first Climate Resilience Plan for its Richland Campus. PNNL has performed Climate Resilience Planning for the Department of Defense, Nuclear Regulatory Commission, and Department of Energy (DOE) over the past 5 years. The assessment team included climate scientists, social scientists, engineers, and operations managers. A multi-disciplinary team was needed to understand the potential exposures to future changes at the site, the state of the science on future impacts, and the best process for “mainstreaming” new actions into existing activities. The team uncovered that the site’s greatest vulnerabilities, and therefore prioritiesmore » for climate resilience planning, are high temperature due to degraded infrastructure, increased wildfire frequency, and intense precipitation impacts on stormwater conveyance systems.« less
Integrating impact assessment and conflict management in urban planning: Experiences from Finland
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peltonen, Lasse, E-mail: lasse.peltonen@tkk.f; Sairinen, Rauno, E-mail: rauno.sairinen@joensuu.f
2010-09-15
The article examines the interlinkages between recent developments in conflict management and impact assessment procedures in the context of urban planning in Finland. It sets out by introducing the fields of impact assessment and conflict mediation. It then proceeds to discuss the development of impact assessment practices and the status of conflict mediation in Finnish land use planning. The case of Korteniitty infill development plan in Jyvaeskylae is used to demonstrate how the Finnish planning system operates in conflict situations - and how social impact assessment can contribute to managing planning conflicts. The authors ask how the processes of impactmore » assessment contribute to conflict management. Based on the Finnish experience, it is argued that social impact assessment of land use plans can contribute to conflict management, especially in the absence of institutionalised conflict mediation processes. In addition, SIA may acquire features of conflict mediation, depending on extent and intensity of stakeholder participation in the process, and the quality of linkages it between knowledge production and decision-making. Simultaneously, conflict mediation practices and theoretical insights can inform the application of SIA to help it address land use conflicts more consciously.« less
Code of Federal Regulations, 2010 CFR
2010-10-01
.... (h) Automated data processing computer systems, including: (1) Planning efforts in the identification, evaluation, and selection of an automated data processing computer system solution meeting the program... existing automated data processing computer system to support Tribal IV-D program operations, and...
Code of Federal Regulations, 2013 CFR
2013-10-01
.... (h) Automated data processing computer systems, including: (1) Planning efforts in the identification, evaluation, and selection of an automated data processing computer system solution meeting the program... existing automated data processing computer system to support Tribal IV-D program operations, and...
Code of Federal Regulations, 2014 CFR
2014-10-01
.... (h) Automated data processing computer systems, including: (1) Planning efforts in the identification, evaluation, and selection of an automated data processing computer system solution meeting the program... existing automated data processing computer system to support Tribal IV-D program operations, and...
Code of Federal Regulations, 2012 CFR
2012-10-01
.... (h) Automated data processing computer systems, including: (1) Planning efforts in the identification, evaluation, and selection of an automated data processing computer system solution meeting the program... existing automated data processing computer system to support Tribal IV-D program operations, and...
Code of Federal Regulations, 2011 CFR
2011-10-01
.... (h) Automated data processing computer systems, including: (1) Planning efforts in the identification, evaluation, and selection of an automated data processing computer system solution meeting the program... existing automated data processing computer system to support Tribal IV-D program operations, and...
Tug fleet and ground operations schedules and controls. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
1975-01-01
This study presents Tug Fleet and Ground Operations Schedules and Controls plan. This plan was developed and optimized out of a combination of individual Tug program phased subplans, special emphasis studies, contingency analyses and sensitivity analyses. The subplans cover the Tug program phases: (1) Tug operational, (2) Interim Upper Stage (IUS)/Tug fleet utilization, (3) and IUS/Tug payload integration, (4) Tug site activation, (5) IUS/Tug transition, (6) Tug acquisition. Resource requirements (facility, GSE, TSE, software, manpower, logistics) are provided in each subplan, as are appropriate Tug processing flows, active and total IUS and Tug fleet requirements, fleet management and Tug payload integration concepts, facility selection recommendations, site activation and IUS to Tug transition requirements. The impact of operational concepts on Tug acquisition is assessed and the impact of operating Tugs out of KSC and WTR is analyzed and presented showing WTR as a delta. Finally, cost estimates for fleet management and ground operations of the DDT&E and operational phases of the Tug program are given.
Efficiency Management in Spaceflight Systems
NASA Technical Reports Server (NTRS)
Murphy, Karen
2016-01-01
Efficiency in spaceflight is often approached as “faster, better, cheaper – pick two”. The high levels of performance and reliability required for each mission suggest that planners can only control for two of the three. True efficiency comes by optimizing a system across all three parameters. The functional processes of spaceflight become technical requirements on three operational groups during mission planning: payload, vehicle, and launch operations. Given the interrelationships among the functions performed by the operational groups, optimizing function resources from one operational group to the others affects the efficiency of those groups and therefore the mission overall. This paper helps outline this framework and creates a context in which to understand the effects of resource trades on the overall system, improving the efficiency of the operational groups and the mission as a whole. This allows insight into and optimization of the controlling factors earlier in the mission planning stage.
30 CFR 784.23 - Operation plan: Maps and plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Maps and plans. 784.23 Section... PLAN § 784.23 Operation plan: Maps and plans. Each application shall contain maps and plans as follows... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...
Interactive orbital proximity operations planning system
NASA Technical Reports Server (NTRS)
Grunwald, Arthur J.; Ellis, Stephen R.
1989-01-01
An interactive, graphical proximity operations planning system was developed which allows on-site design of efficient, complex, multiburn maneuvers in the dynamic multispacecraft environment about the space station. Maneuvering takes place in, as well as out of, the orbital plane. The difficulty in planning such missions results from the unusual and counterintuitive character of relative orbital motion trajectories and complex operational constraints, which are both time varying and highly dependent on the mission scenario. This difficulty is greatly overcome by visualizing the relative trajectories and the relative constraints in an easily interpretable, graphical format, which provides the operator with immediate feedback on design actions. The display shows a perspective bird's-eye view of the space station and co-orbiting spacecraft on the background of the station's orbital plane. The operator has control over two modes of operation: (1) a viewing system mode, which enables him or her to explore the spatial situation about the space station and thus choose and frame in on areas of interest; and (2) a trajectory design mode, which allows the interactive editing of a series of way-points and maneuvering burns to obtain a trajectory which complies with all operational constraints. Through a graphical interactive process, the operator will continue to modify the trajectory design until all operational constraints are met. The effectiveness of this display format in complex trajectory design is presently being evaluated in an ongoing experimental program.
Charting a path to efficiencies following a merger.
Klar, Brandon; Shufelt, Gregory P
2015-06-01
Health systems can access the full range of opportunities for enhanced efficiencies following a merger or an acquisition by pursuing the following five-step process, which constitutes the development of a business plan of operational efficiencies: Secure executive sponsorship and involvement. Establish an integration steering committee. Develop guiding principles. Identify and validate potential efficiencies. Develop an action plan for each department and function.
Reducing Operating Costs by Optimizing Space in Facilities
2012-03-01
Base level 5 engineering units will provide facility floor plans, furniture layouts, and staffing documentation as necessary. One obstacle...due to the quantity and diverse locations. Base level engineering units provided facility floor plans, furniture layouts, and staffing documentation... furniture purchases and placement 5. Follow a quality systematic process in all decisions The per person costs can be better understood with a real
Hansson, Johan; Tolf, Sara; Øvretveit, John; Carlsson, Jan; Brommels, Mats
2012-01-01
Both research and practice show that waiting lists are hard to reduce. Implementing complex interventions for reduced waits is an intricate and challenging process that requires special attention for surrounding factors helping and hindering the implementation. This article reports a case study of a hospital implementation of operational plans for reduced waits, with an emphasis on the process of change. A case study research design, theoretically informed by the Pettigrew and Whipp model of strategic change, was applied. Data were gathered from individual and focus group interviews with informants from different organizational levels at different times and from documents and plans. The findings revealed arrangements both helping and hindering the implementation work. Helping factors were the hospital's contemporary savings requirements and experiences from similar change initiatives. Those hindering the actions to plan and agree the changes were unclear support functions and unclear task prioritization. One contribution of this study is to demonstrate the advantages, disadvantages, and challenges of a contextualized case study for increased understanding of factors influencing organizational change implementation. One lesson for current policy is to regard context factors that are critical for successful implementation.
Managing a palliative oncology program: the role of a business plan.
Walsh, D; Gombeski, W R; Goldstein, P; Hayes, D; Armour, M
1994-02-01
Today's health-care environment demands that palliative-care programs operate in a businesslike manner. This report summarizes the business plan and the process followed to develop the Palliative Care Program at the Cleveland Clinic Foundation (CCF). The benefits generated from this effort and the lessons learned that may be helpful to other program managers are described. By disciplining itself to focus on financial, marketing, and operational issues, the Palliative Care Program is in a better position to advance its clinical services within the organization and in its market area, and can thereby serve its patients more effectively.
Aspects of remote maintenance in an FRG reprocessing plant from the manufacturer's viewpoint
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zeitzchel, G.; Tennie, M.; Saal, G.
In April 1986 a consortium led by Kraftwerk Union AG was commissioned by the German society for nuclear fuel reprocessing (DWK) to build the first West German commercial reprocessing plant for spent fuel assemblies. The main result of the planning efforts regarding remote maintenance operations inside the main process building was the introduction of FEMO technology (FEMO is an acronym based on German for remote handling modular technique). According to this technology the two cells in which the actual reprocessing (which is based on the PUREX technique) takes place are provided with frames to accommodate the process components (tanks, pumps,more » agitators, etc.), each frame together with the components which it supports forming one module. The two cells are inaccessible and windowless. For handling operations each cell is equipped with an overhead crane and a crane-like manipulator carrier system (MTS) with power manipulator. Viewing of the operations from outside the cells is made possible by television (TV) cameras installed at the crane, the MTS, and the manipulator. This paper addresses some examples of problems that still need to be solved in connection with FEMO handling. In particular, the need for close cooperation between the equipment operator, the component designer, the process engineer, the planning engineer, and the licensing authorities will be demonstrated.« less
Wang, Monan; Zhang, Kai; Yang, Ning
2018-04-09
To help doctors decide their treatment from the aspect of mechanical analysis, the work built a computer assisted optimal system for treatment of femoral neck fracture oriented to clinical application. The whole system encompassed the following three parts: Preprocessing module, finite element mechanical analysis module, post processing module. Preprocessing module included parametric modeling of bone, parametric modeling of fracture face, parametric modeling of fixed screw and fixed position and input and transmission of model parameters. Finite element mechanical analysis module included grid division, element type setting, material property setting, contact setting, constraint and load setting, analysis method setting and batch processing operation. Post processing module included extraction and display of batch processing operation results, image generation of batch processing operation, optimal program operation and optimal result display. The system implemented the whole operations from input of fracture parameters to output of the optimal fixed plan according to specific patient real fracture parameter and optimal rules, which demonstrated the effectiveness of the system. Meanwhile, the system had a friendly interface, simple operation and could improve the system function quickly through modifying single module.
Tools and Equipment Modeling for Automobile Interactive Assembling Operating Simulation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wu Dianliang; Zhu Hongmin; Shanghai Key Laboratory of Advance Manufacturing Environment
Tools and equipment play an important role in the simulation of virtual assembly, especially in the assembly process simulation and plan. Because of variety in function and complexity in structure and manipulation, the simulation of tools and equipments remains to be a challenge for interactive assembly operation. Based on analysis of details and characteristics of interactive operations for automobile assembly, the functional requirement for tools and equipments of automobile assembly is given. Then, a unified modeling method for information expression and function realization of general tools and equipments is represented, and the handling methods of manual, semi-automatic, automatic tools andmore » equipments are discussed. Finally, the application in assembly simulation of rear suspension and front suspension of Roewe 750 automobile is given. The result shows that the modeling and handling methods are applicable in the interactive simulation of various tools and equipments, and can also be used for supporting assembly process planning in virtual environment.« less
30 CFR 780.14 - Operation plan: Maps and plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Maps and plans. 780.14 Section... PLAN § 780.14 Operation plan: Maps and plans. Each application shall contain maps and plans as follows: (a) The maps and plans shall show the lands proposed to be affected throughout the operation and any...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NGUYEN, D.M.
1999-06-01
The US. Department of Energy, Richland Operations Office (DOE-RL) has initiated Phase 1 of a two-phase privatization strategy for treatment and immobilization of low-activity waste (LAW) currently being managed by the Hanford Tank Waste Remediation System (TWRS) Project. In this strategy, DOE will purchase services from a contractor-owned and operated facility under a fixed price. The Phase 1 TWRS privatization contract requires that the Project Hanford Management Contract (PHMC) contractors, on behalf of DOE, deliver LAW feed in specified quantities and composition to the Privatization Contractor in a timely manner (DOE-RL 1996). Additional requirements are imposed by the interface controlmore » document (ICD-19) for LAW feed (PHMC 1997). In response to these requirements, the Tank Waste Remediation System Operation and Utilization Plan (TWRSO and UP) (Kirkbride et al. 1997) was prepared by the PHMC. The TWRSO and UP, as updated by the Readiness-To-Proceed deliverable (Payne et al. 1998), establishes the baseline operating scenario for the delivery of LAW feed to the Privatization Contractor. The scenario specifies tanks from which LAW will be provided for each feed batch, the operational activities needed to prepare and deliver each batch, and the timing of these activities. The operating scenario was developed based on current knowledge of waste composition and chemistry, waste transfer methods, and operating constraints, such as tank farm logistics and availability of tank space. A project master baseline schedule (PMBS) has been developed to implement the operating scenario. The PMBS also includes activities aimed at reducing programmatic risks. One of the activities, ''Confirm Plans and Requirements,'' was identified to verify the basis used to develop the scenario. Additional data on waste quantity, physical and chemical characteristics, and transfer properties will be needed to support this activity. This document describes the data quality objective (DQO) process undertaken to assme appropriate data will be collected to support the activity, ''Confirm Tank Plans and Requirements.'' The DQO process was implemented in accordance with the TWRS DQO process (Banning 1997) with some modifications to accommodate project or tank-specific requirements and constraints.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fix, N. J.
The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurancemore » requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.« less
Need for evaluative methodologies in land use, regional resource and waste management planning
DOE Office of Scientific and Technical Information (OSTI.GOV)
Croke, E. J.
The transfer of planning methodology from the research community to the practitioner very frequently takes the form of analytical and evaluative techniques and procedures. In the end, these become operational in the form of data acquisition, management and display systems, computational schemes that are codified in the form of manuals and handbooks, and computer simulation models. The complexity of the socioeconomic and physical processes that govern environmental resource and waste management have reinforced the need for computer assisted, scientifically sophisticated planning models that are fully operational, dependent on an attainable data base and accessible in terms of the resources normallymore » available to practitioners of regional resource management, waste management, and land use planning. A variety of models and procedures that attempt to meet one or more of the needs of these practitioners are discussed.« less
NASA Astrophysics Data System (ADS)
O'Connor, Alison; Kirtman, Benjamin; Harrison, Scott; Gorman, Joe
2016-05-01
The US Navy faces several limitations when planning operations in regard to forecasting environmental conditions. Currently, mission analysis and planning tools rely heavily on short-term (less than a week) forecasts or long-term statistical climate products. However, newly available data in the form of weather forecast ensembles provides dynamical and statistical extended-range predictions that can produce more accurate predictions if ensemble members can be combined correctly. Charles River Analytics is designing the Climatological Observations for Maritime Prediction and Analysis Support Service (COMPASS), which performs data fusion over extended-range multi-model ensembles, such as the North American Multi-Model Ensemble (NMME), to produce a unified forecast for several weeks to several seasons in the future. We evaluated thirty years of forecasts using machine learning to select predictions for an all-encompassing and superior forecast that can be used to inform the Navy's decision planning process.
Equipment Location Plan, partial basement plan. (Includes identification of each ...
Equipment Location Plan, partial basement plan. (Includes identification of each separate CPU, tape drive, hard drive, printer, keyboard, etc., within the data processing center in the southeast part of the basement.) March Air Force Base, Riverside, California, Combat Operations Center, 465-L DPC. By International Electric Corporation, Paramus, New Jersey (3/5/62); for Moffatt and Nichol, Engineers, 122 West Fifth Street, Long Beach, California; for the Corps of Engineers, U.S. Army, Office of the District Engineer, Los Angeles, California. Drawing no. AW-60-02-03, sheet no. 100, approved March, 1962; specifications no. OCI-62-66; D.O. series AW 1596/100, Rev. "A"; file drawer 1290. Last revised 3 October 1966. Scale one-quarter inch to one foot. 28.75x40.5 inches. ink on linen - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA
Equipment Location Plan, partial first floor plan. (Includes identification of ...
Equipment Location Plan, partial first floor plan. (Includes identification of each separate CPU, tape drive, hard drive, printer, keyboard, etc., within the data processing center in the southwest part of the first floor.) March Air Force Base, Riverside, California, Combat Operations Center, 465-L EDTCC/EDLCC. By International Electric Corporation, Paramus, New Jersey (3/5/62); for Moffatt and Nichol, Engineers, 122 West Fifth Street, Long Beach, California; for the Corps of Engineers, U.S. Army, Office of the District Engineer, Los Angeles, California. Drawing no. AW-60-02-03, sheet no. 85, approved March, 1962; specifications no. OCI-62-66; D.O. series AW 1596/85, Rev. "A"; file drawer 1290. Last revised 3 October 1966. Scale one-quarter inch to one foot. 28.75x40.5 inches. ink on linen - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA
NOAA Activities and Plans for New Operational Space Weather Platforms and Sensors
NASA Astrophysics Data System (ADS)
Biesecker, D. A.; Mulligan, P.; Cash, M. D.; Reinard, A.; Simpson, M.; Diedrich, B.; Socker, D. G.
2013-12-01
The National Oceanic and Atmospheric Administration (NOAA) is vigorously pursuing several space weather platforms that have been demonstrated as requiring replacement. In this time of limited budgets, this has led to the need for creative and innovative solutions. Just as importantly, NOAA is only 13 months away from the launch of its first L1 solar wind monitor, the DSCOVR mission. At the same time, a private company, L'Garde Inc. will be launching a solar sail mission with NOAA as a partner. Recognizing the importance of solar wind monitoring and the need for continuity, the planning process is already underway for the DSCOVR follow-on mission and scenarios for that include commercial data purchases and solar sails. Finally, NOAA planning for an operational coronagraph is moving forward, with continuing development of the Naval Research Laboratory's Compact Coronagraph (CCOR). We will provide details on the current NOAA plans for each of these missions.
Kent County Health Department: Using an Agency Strategic Plan to Drive Improvement.
Saari, Chelsey K
The Kent County Health Department (KCHD) was accredited by the Public Health Accreditation Board (PHAB) in September 2014. Although Michigan has had a state-level accreditation process for local health departments since the late 1990s, the PHAB accreditation process presented a unique opportunity for KCHD to build on successes achieved through state accreditation and enhance performance in all areas of KCHD programs, services, and operations. PHAB's standards, measures, and peer-review process provided a standardized and structured way to identify meaningful opportunities for improvement and to plan and implement strategies for enhanced performance and established a platform for being recognized nationally as a high-performing local health department. The current case report highlights the way in which KCHD has developed and implemented its strategic plan to guide efforts aimed at addressing gaps identified through the accreditation process and to drive overall improvement within our agency.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-09-01
The Ernest Orlando Lawrence Berkeley National Laboratory`s Comprehensive Facilities Plan (CFP) document provides analysis and policy guidance for the effective use and orderly future development of land and capital assets at the Berkeley Lab site. The CFP directly supports Berkeley Lab`s role as a multiprogram national laboratory operated by the University of California (UC) for the Department of Energy (DOE). The CFP is revised annually on Berkeley Lab`s Facilities Planning Website. Major revisions are consistent with DOE policy and review guidance. Facilities planing is motivated by the need to develop facilities for DOE programmatic needs; to maintain, replace and rehabilitatemore » existing obsolete facilities; to identify sites for anticipated programmatic growth; and to establish a planning framework in recognition of site amenities and the surrounding community. The CFP presents a concise expression of the policy for the future physical development of the Laboratory, based upon anticipated operational needs of research programs and the environmental setting. It is a product of the ongoing planning processes and is a dynamic information source.« less
NASA Astrophysics Data System (ADS)
After completion of the field phase of WAMEX, operations were assessed, further planning of data management activities was reviewed, and plans for the research and evaluation phase were coordinated. The WAMEX project was conducted concurrently with the first GARP Global Experiment. Impending data collection and processing activities are stressed in plans to promote the timely and complete analysis of the present situation. The advantages to be gained through international cooperation among scientists are emphasized.
Green, Andrew; Collins, Charles; Stefanini, Angelo; Ferrinho, Paulo; Chapman, Glyn; Hagos, Besrat; Adams, Yussuf; Omar, Mayeh
2007-01-01
This paper reports on comparative analysis of health planning and its relationship with health care reform in three countries, Eritrea, Mozambique and Zimbabwe. The research examined strategic planning in each country focusing in particular on its role in developing health sector reforms. The paper analyses the processes for strategic planning, the values that underpin the planning systems, and issues related to resources for planning processes. The resultant content of strategic plans is assessed and not seen to have driven the development of reforms; whilst each country had adopted strategic planning systems, in all three countries a more complex interplay of forces, including influences outside both the health sector and the country, had been critical forces behind the sectoral changes experienced over the previous decade. The key roles of different actors in developing the plans and reforms are also assessed. The paper concludes that a number of different conceptions of strategic planning exist and will depend on the particular context within which the health system is placed. Whilst similarities were discovered between strategic planning systems in the three countries, there are also key differences in terms of formality, timeframes, structures and degrees of inclusiveness. No clear leadership role for strategic planning in terms of health sector reforms was discovered. Planning appears in the three countries to be more operational than strategic. Copyright (c) 2006 John Wiley & Sons, Ltd.
Using Institutional Survey Data to Jump-Start Your Benchmarking Process
ERIC Educational Resources Information Center
Chow, Timothy K. C.
2012-01-01
Guided by the missions and visions, higher education institutions utilize benchmarking processes to identify better and more efficient ways to carry out their operations. Aside from the initial planning and organization steps involved in benchmarking, a matching or selection step is crucial for identifying other institutions that have good…
Periodic, On-Demand, and User-Specified Information Reconciliation
NASA Technical Reports Server (NTRS)
Kolano, Paul
2007-01-01
Automated sequence generation (autogen) signifies both a process and software used to automatically generate sequences of commands to operate various spacecraft. Autogen requires fewer workers than are needed for older manual sequence-generation processes and reduces sequence-generation times from weeks to minutes. The autogen software comprises the autogen script plus the Activity Plan Generator (APGEN) program. APGEN can be used for planning missions and command sequences. APGEN includes a graphical user interface that facilitates scheduling of activities on a time line and affords a capability to automatically expand, decompose, and schedule activities.
Assessment of Scheduling and Plan Execution of Apollo 14 Lunar Surface Operations
NASA Technical Reports Server (NTRS)
Marquez, Jessica J.
2010-01-01
Although over forty years have passed since first landing on the Moon, there is not yet a comprehensive, quantitative assessment of Apollo extravehicular activities (EVAs). Quantitatively evaluating lunar EVAs will provide a better understanding of the challenges involved with surface operations. This first evaluation of a surface EVA centers on comparing the planned and the as-ran timeline, specifically collecting data on discrepancies between durations that were estimated versus executed. Differences were summarized by task categories in order to gain insight as to the type of surface operation activities that were most challenging. One Apollo 14 EVA was assessed utilizing the described methodology. Selected metrics and task categorizations were effective, and limitations to this process were identified.
Putting people on the map through an approach that integrates social data in conservation planning.
Stephanson, Sheri L; Mascia, Michael B
2014-10-01
Conservation planning is integral to strategic and effective operations of conservation organizations. Drawing upon biological sciences, conservation planning has historically made limited use of social data. We offer an approach for integrating data on social well-being into conservation planning that captures and places into context the spatial patterns and trends in human needs and capacities. This hierarchical approach provides a nested framework for characterizing and mapping data on social well-being in 5 domains: economic well-being, health, political empowerment, education, and culture. These 5 domains each have multiple attributes; each attribute may be characterized by one or more indicators. Through existing or novel data that display spatial and temporal heterogeneity in social well-being, conservation scientists, planners, and decision makers may measure, benchmark, map, and integrate these data within conservation planning processes. Selecting indicators and integrating these data into conservation planning is an iterative, participatory process tailored to the local context and planning goals. Social well-being data complement biophysical and threat-oriented social data within conservation planning processes to inform decisions regarding where and how to conserve biodiversity, provide a structure for exploring socioecological relationships, and to foster adaptive management. Building upon existing conservation planning methods and insights from multiple disciplines, this approach to putting people on the map can readily merge with current planning practices to facilitate more rigorous decision making. © 2014 Society for Conservation Biology.
Coup d’Oeil: Military Geography and the Operational Level of War
1991-05-16
afUP D’OEIL Every day I feel nmre rnd more in need of an atlas, as geogrphvy iv the minutest details. is essential to a true nli "tary education. I...categorizing terrain have provided the essential prerequisites for the development of the IPB process. The process allows for an in-depth technical analysis of...is theater whiidch define the lines of essential to the c •umnrs plan. operation. ... defined by a conpetent authority. CENTER Zi f GRAVIMI Center of
NASA Astrophysics Data System (ADS)
Pries, V. V.; Proskuriakov, N. E.
2018-04-01
To control the assembly quality of multi-element mass-produced products on automatic rotor lines, control methods with operational feedback are required. However, due to possible failures in the operation of the devices and systems of automatic rotor line, there is always a real probability of getting defective (incomplete) products into the output process stream. Therefore, a continuous sampling control of the products completeness, based on the use of statistical methods, remains an important element in managing the quality of assembly of multi-element mass products on automatic rotor lines. The feature of continuous sampling control of the multi-element products completeness in the assembly process is its breaking sort, which excludes the possibility of returning component parts after sampling control to the process stream and leads to a decrease in the actual productivity of the assembly equipment. Therefore, the use of statistical procedures for continuous sampling control of the multi-element products completeness when assembled on automatic rotor lines requires the use of such sampling plans that ensure a minimum size of control samples. Comparison of the values of the limit of the average output defect level for the continuous sampling plan (CSP) and for the automated continuous sampling plan (ACSP) shows the possibility of providing lower limit values for the average output defects level using the ACSP-1. Also, the average sample size when using the ACSP-1 plan is less than when using the CSP-1 plan. Thus, the application of statistical methods in the assembly quality management of multi-element products on automatic rotor lines, involving the use of proposed plans and methods for continuous selective control, will allow to automating sampling control procedures and the required level of quality of assembled products while minimizing sample size.
Designing Mission Operations for the Gravity Recovery and Interior Laboratory Mission
NASA Technical Reports Server (NTRS)
Havens, Glen G.; Beerer, Joseph G.
2012-01-01
NASA's Gravity Recovery and Interior Laboratory (GRAIL) mission, to understand the internal structure and thermal evolution of the Moon, offered unique challenges to mission operations. From launch through end of mission, the twin GRAIL orbiters had to be operated in parallel. The journey to the Moon and into the low science orbit involved numerous maneuvers, planned on tight timelines, to ultimately place the orbiters into the required formation-flying configuration necessary. The baseline GRAIL mission is short, only 9 months in duration, but progressed quickly through seven very unique mission phases. Compressed into this short mission timeline, operations activities and maneuvers for both orbiters had to be planned and coordinated carefully. To prepare for these challenges, development of the GRAIL Mission Operations System began in 2008. Based on high heritage multi-mission operations developed by NASA's Jet Propulsion Laboratory and Lockheed Martin, the GRAIL mission operations system was adapted to meet the unique challenges posed by the GRAIL mission design. This paper describes GRAIL's system engineering development process for defining GRAIL's operations scenarios and generating requirements, tracing the evolution from operations concept through final design, implementation, and validation.
Planning in the Continuous Operations Environment of the International Space Station
NASA Technical Reports Server (NTRS)
Maxwell, Theresa; Hagopian, Jeff
1996-01-01
The continuous operation planning approach developed for the operations planning of the International Space Station (ISS) is reported on. The approach was designed to be a robust and cost-effective method. It separates ISS planning into two planning functions: long-range planning for a fixed length planning horizon which continually moves forward as ISS operations progress, and short-range planning which takes a small segment of the long-range plan and develops a detailed operations schedule. The continuous approach is compared with the incremental approach, the short and long-range planning functions are described, and the benefits and challenges of implementing a continuous operations planning approach for the ISS are summarized.
Automated Array Assembly, Phase 2
NASA Technical Reports Server (NTRS)
Daiello, R. V.
1978-01-01
The purpose of the overall program is to establish technological readiness and provide verification for the elements of a manufacturing sequence which would ultimately be suitable for the large-scale production of silicon solar-array modules at a selling price of less than $500/kW. A program and process plan for accomplishing this objective was developed and put into operation. Three junction-formation processes are shown; since cost analysis shows that they do not differ greatly in cost, each should be considered for technical merits and possible future cost reduction. The progress made in the various process steps of the plan is described, and conclusions are presented.
Operation plan for the data 100/LARS terminal system
NASA Technical Reports Server (NTRS)
Bowen, A. J., Jr.
1980-01-01
The Data 100/LARS terminal system provides an interface for processing on the IBM 3031 computer system at Purdue University's Laboratory for Applications of Remote Sensing. The environment in which the system is operated and supported is discussed. The general support responsibilities, procedural mechanisms, and training established for the benefit of the system users are defined.
PATRAM '80. Proceedings. Volume 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Huebner, H.W.
1980-01-01
Volume 2 contains papers from the following sessions: Safeguards-Related Problems; Neutronics and Criticality; Operations and Systems Experience II; Plutonium Systems; Intermediate Storage in Casks; Operations and Systems Planning; Institutional Issues; Structural and Thermal Evaluation I; Poster Session B; Extended Testing I; Structural and Thermal Evaluation II; Extended Testing II; and Emergency Preparedness and Response. Individual papers were processed. (LM)
ERIC Educational Resources Information Center
Lavonen, Jari; Lattu, Matti; Juuti, Kalle; Meisalo, Veijo
2006-01-01
An ICT strategy and an implementation plan for teacher education were created in a co-operative process. Visions and expectations of staff members and students were registered by questionnaires and by making notes during sessions in which the strategy was created. Thereafter, an implementation document, where the staff development programme and…
Redefining Tactical Operations for MER Using Cloud Computing
NASA Technical Reports Server (NTRS)
Joswig, Joseph C.; Shams, Khawaja S.
2011-01-01
The Mars Exploration Rover Mission (MER) includes the twin rovers, Spirit and Opportunity, which have been performing geological research and surface exploration since early 2004. The rovers' durability well beyond their original prime mission (90 sols or Martian days) has allowed them to be a valuable platform for scientific research for well over 2000 sols, but as a by-product it has produced new challenges in providing efficient and cost-effective tactical operational planning. An early stage process adaptation was the move to distributed operations as mission scientists returned to their places of work in the summer of 2004, but they would still came together via teleconference and connected software to plan rover activities a few times a week. This distributed model has worked well since, but it requires the purchase, operation, and maintenance of a dedicated infrastructure at the Jet Propulsion Laboratory. This server infrastructure is costly to operate and the periodic nature of its usage (typically heavy usage for 8 hours every 2 days) has made moving to a cloud based tactical infrastructure an extremely tempting proposition. In this paper we will review both past and current implementations of the tactical planning application focusing on remote plan saving and discuss the unique challenges present with long-latency, distributed operations. We then detail the motivations behind our move to cloud based computing services and as well as our system design and implementation. We will discuss security and reliability concerns and how they were addressed
El Batawi, H Y
2014-06-01
To investigate factors that might affect the clinical outcome of early childhood caries treatment under dental general anaesthesia (DGA). Retrospective longitudinal study. The medical records of paediatric patients with early childhood caries who underwent full dental rehabilitation under DGA during 2011 in a private medical facility in Jeddah, Saudi Arabia, were investigated. Study parameters were the patient's financial arrangements and compliance with suggested recall plan. Statistical analysis of caries recurrence and the need to repeat the rehabilitation process was also performed. Eighteen percent failed to attend any post-operative visit. Twenty-six percent did not comply with the post-operative preventive plan. The overall relapse rate was high (58.5%), with the highest percentage (68%) among the non-compliant group. The highest frequency of repeat DGA (10%) was in the non-compliant group. Despite the high rate of post-operative caries recurrence, DGA is still an acceptable treatment option as it minimises the need for future dental treatment. Compliance by caregivers with post-operative care plans is as important as the procedure itself. In Saudi Arabia, targeting the actual caregivers with post-operative dental health education presents challenges that might affect the clinical outcome of DGA.
Real-Time Operation of the International Space Station
NASA Astrophysics Data System (ADS)
Suffredini, M. T.
2002-01-01
The International Space Station is on orbit and real-time operations are well underway. Along with the assembly challenges of building and operating the International Space Station , scientific activities are also underway. Flight control teams in three countries are working together as a team to plan, coordinate and command the systems on the International Space Station.Preparations are being made to add the additional International Partner elements including their operations teams and facilities. By October 2002, six Expedition crews will have lived on the International Space Station. Management of real-time operations has been key to these achievements. This includes the activities of ground teams in control centers around the world as well as the crew on orbit. Real-time planning is constantly challenged with balancing the requirements and setting the priorities for the assembly, maintenance, science and crew health functions on the International Space Station. It requires integrating the Shuttle, Soyuz and Progress requirements with the Station. It is also necessary to be able to respond in case of on-orbit anomalies and to set plans and commands in place to ensure the continues safe operation of the Station. Bringing together the International Partner operations teams has been challenging and intensely rewarding. Utilization of the assets of each partner has resulted in efficient solutions to problems. This paper will describe the management of the major real-time operations processes, significant achievements, and future challenges.
Pant, Anjali T; Kirsch, Thomas D; Subbarao, Italo R; Hsieh, Yu-Hsiang; Vu, Alexander
2008-01-01
In the aftermath of Hurricane Katrina, a significant number of faith-based organizations (FBOs) that were not a part of the formal National Response Plan (NRP) initiated and sustained sheltering operations. The objective of this study was to examine the sheltering operations of FBOs, understand the decision-making process of FBO shelters, and identify the advantages and disadvantages of FBO shelters. Verbal interviews were conducted with FBO shelter leaders. Inclusion criteria were: (1) opening in response to the Katrina disaster; (2) operating for more than three weeks; and (3) being a FBO. Enrolled shelters were examined using descriptive data methods. The majority of shelters operating in Mississippi up to three weeks post-Katrina were FBO-managed. All of the operating FBO shelters in Mississippi that met the inclusion criteria were contacted with a response rate of 94%. Decisions were made by individuals or small groups in most shelters regarding opening, operating procedures, and closing. Most FBOs provided at least one enabling service to evacuees, and all utilized informal networks for sheltering operations. Only 25% of FBOs had disaster plans in place prior to Hurricane Katrina. Faith-based organization shelters played a significant role in the acute phase of the Katrina disaster. Formal disaster training should be initiated for these organizations. Services provided by FBOs should be standardized. Informal networks should be incorporated into national disaster planning.
Operability engineering in the Deep Space Network
NASA Technical Reports Server (NTRS)
Wilkinson, Belinda
1993-01-01
Many operability problems exist at the three Deep Space Communications Complexes (DSCC's) of the Deep Space Network (DSN). Four years ago, the position of DSN Operability Engineer was created to provide the opportunity for someone to take a system-level approach to solving these problems. Since that time, a process has been developed for personnel and development engineers and for enforcing user interface standards in software designed for the DSCC's. Plans are for the participation of operations personnel in the product life-cycle to expand in the future.
Automated and Adaptive Mission Planning for Orbital Express
NASA Technical Reports Server (NTRS)
Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Daniel; Koblick, Darin
2008-01-01
The Orbital Express space mission was a Defense Advanced Research Projects Agency (DARPA) lead demonstration of on-orbit satellite servicing scenarios, autonomous rendezvous, fluid transfers of hydrazine propellant, and robotic arm transfers of Orbital Replacement Unit (ORU) components. Boeing's Autonomous Space Transport Robotic Operations (ASTRO) vehicle provided the servicing to the Ball Aerospace's Next Generation Serviceable Satellite (NextSat) client. For communication opportunities, operations used the high-bandwidth ground-based Air Force Satellite Control Network (AFSCN) along with the relatively low-bandwidth GEO-Synchronous space-borne Tracking and Data Relay Satellite System (TDRSS) network. Mission operations were conducted out of the RDT&E Support Complex (RSC) at the Kirtland Air Force Base in New Mexico. All mission objectives were met successfully: The first of several autonomous rendezvous was demonstrated on May 5, 2007; autonomous free-flyer capture was demonstrated on June 22, 2007; the fluid and ORU transfers throughout the mission were successful. Planning operations for the mission were conducted by a team of personnel including Flight Directors, who were responsible for verifying the steps and contacts within the procedures, the Rendezvous Planners who would compute the locations and visibilities of the spacecraft, the Scenario Resource Planners (SRPs), who were concerned with assignment of communications windows, monitoring of resources, and sending commands to the ASTRO spacecraft, and the Mission planners who would interface with the real-time operations environment, process planning products and coordinate activities with the SRP. The SRP position was staffed by JPL personnel who used the Automated Scheduling and Planning ENvironment (ASPEN) to model and enforce mission and satellite constraints. The lifecycle of a plan began three weeks outside its execution on-board. During the planning timeframe, many aspects could change the plan, causing the need for re-planning. These variable factors, ranging from shifting contact times to ground-station closures and required maintenance times, are discussed along with the flexibility of the ASPEN tool to accommodate changes to procedures and the daily or long-range plan, which contributed to the success of the mission. This paper will present an introduction to ASPEN, a more in-depth discussion on its use on the Orbital Express mission, and other relative work. A description of ground operations after the SRP deliveries were made is included, and we briefly discuss lessons learned from the planning perspective and future work.
Contingency Analysis Post-Processing With Advanced Computing and Visualization
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, Yousu; Glaesemann, Kurt; Fitzhenry, Erin
Contingency analysis is a critical function widely used in energy management systems to assess the impact of power system component failures. Its outputs are important for power system operation for improved situational awareness, power system planning studies, and power market operations. With the increased complexity of power system modeling and simulation caused by increased energy production and demand, the penetration of renewable energy and fast deployment of smart grid devices, and the trend of operating grids closer to their capacity for better efficiency, more and more contingencies must be executed and analyzed quickly in order to ensure grid reliability andmore » accuracy for the power market. Currently, many researchers have proposed different techniques to accelerate the computational speed of contingency analysis, but not much work has been published on how to post-process the large amount of contingency outputs quickly. This paper proposes a parallel post-processing function that can analyze contingency analysis outputs faster and display them in a web-based visualization tool to help power engineers improve their work efficiency by fast information digestion. Case studies using an ESCA-60 bus system and a WECC planning system are presented to demonstrate the functionality of the parallel post-processing technique and the web-based visualization tool.« less
Intelligent Transportation System Strategic Plan For Las Vegas Valley
DOT National Transportation Integrated Search
1996-11-01
"INTELLIGENT TRANSPORTATION SYSTEMS" (ITS) IS A COLLECTIVE TERM FOR MEASURES TARGETING THE EFFICIENT OPERATIONS AND MANAGEMENT OF TRANSPORTATION FACILITIES AND SERVICES, USUALLY INVOLVING THE USE OF ELECTRONIC EQUIPMENT FOR COLLECTING,. PROCESSING, R...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lewis, H.E.
1981-08-01
The plant was in operation for the equivalent of 247 days, an on-stream factor of 67.7%. Kentucky 9 coals from the Lafayette, Dotiki and Fies mines were processed. During 1980, the operating conditions and equipment were adjusted to evaluate potential process improvements. These experiments produced significant results in the following areas: Operating V103 High Pressure Separator in the hot mode; varying T102 Vacuum Column operating temperature; adding light SRC (LSRC), a product of the third stage of the Critical Solvent Deashing (CSD) unit, to the process solvent; investigating the effects of the chlorine content of the feed coal on corrosionmore » in the process vessels; evaluating the effects of adding sodium carbonate on corrosion rates; operating under conditions of low severity; i.e., low reactor temperature and long residence time; and testing an alternate CSD deashing solvent. A series of simulation runs investigating the design operating conditions for a planned 6000 ton per day SRC-I demonstation plant were also completed. Numerous improvements were made in the CSD processing area, and the components for a hydrotreating unit were installed.« less
MAPGEN: Mixed-Initiative Activity Planning for the Mars Exploration Rover Mission
NASA Technical Reports Server (NTRS)
Ai-Chang, Mitchell; Bresina, John; Hsu, Jennifer; Jonsson, Ari; Kanefsky, Bob; McCurdy, Michael; Morris, Paul; Rajan, Kanna; Vera, Alonso; Yglesias, Jeffrey
2004-01-01
This document describes the Mixed initiative Activity Plan Generation system MAPGEN. This system is one of the critical tools in the Mars Exploration Rover mission surface operations, where it is used to build activity plans for each of the rovers, each Martian day. The MAPGEN system combines an existing tool for activity plan editing and resource modeling, with an advanced constraint-based reasoning and planning framework. The constraint-based planning component provides active constraint and rule enforcement, automated planning capabilities, and a variety of tools and functions that are useful for building activity plans in an interactive fashion. In this demonstration, we will show the capabilities of the system and demonstrate how the system has been used in actual Mars rover operations. In contrast to the demonstration given at ICAPS 03, significant improvement have been made to the system. These include various additional capabilities that are based on automated reasoning and planning techniques, as well as a new Constraint Editor support tool. The Constraint Editor (CE) as part of the process for generating these command loads, the MAPGEN tool provides engineers and scientists an intelligent activity planning tool that allows them to more effectively generate complex plans that maximize the science return each day. The key to the effectiveness of the MAPGEN tool is an underlying constraint-based planning and reasoning engine.
Management self assessment plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Debban, B.L.
Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled tomore » begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations.« less
NASA Astrophysics Data System (ADS)
Petroy, S. B.; Leisso, N.; Goulden, T.; Gulbransen, T.
2016-12-01
The National Ecological Observatory Network (NEON) is a continental-scale ecological observation platform designed to collect and disseminate data that contributes to understanding and forecasting the impacts of climate change, land use change, and invasive species on ecology. NEON will collect in-situ and airborne data over 81 sites across the US, including Alaska, Hawaii, and Puerto Rico. The Airborne Observation Platform (AOP) group within the NEON project operates a payload suite that includes a waveform LiDAR, imaging spectrometer (NIS) and high resolution RGB camera. Data from this sensor suite will be collected annually over each site and processed into a set of standard data products, generally following the processing levels used by NASA (Level 1 through Level 3). We will present a summary of the first operational flight campaign (2016), where AOP flew 42 of the 81 planned NEON sites, our operational plans for 2017, and how we will ramp up to full operations by 2018. We will also describe the final set of AOP data products to be delivered as part of NEON construction and those field (observational) data products collected concurrently on the ground, that may be used to support validation efforts of algorithms for deriving vegetation characteristics from airborne data (e.g. Plant foliar physical/chemical properties, Digital Hemispherical Photos, Plant Diversity, etc.). Opportunities for future enhancements to data products or algorithms will be facilitated via NEON's cyberinfrastructure, which is designed to support wrapping/integration of externally-developed code. And finally, we will present NEON's plans for the third AOP Sensor Suite as an assignable asset and the intent of NSF to provide research opportunities to the community for developing higher level AOP data products that were removed from the NEON project in 2015.
NASA Technical Reports Server (NTRS)
Izygon, Michel E.
1992-01-01
The development process of the knowledge base for the generation of Test Libraries for Mission Operations Computer (MOC) Command Support focused on a series of information gathering interviews. These knowledge capture sessions are supporting the development of a prototype for evaluating the capabilities of INTUIT on such an application. the prototype includes functions related to POCC (Payload Operation Control Center) processing. It prompts the end-users for input through a series of panels and then generates the Meds associated with the initialization and the update of hazardous command tables for a POCC Processing TLIB.
Research & Technology Report Goddard Space Flight Center
NASA Technical Reports Server (NTRS)
Soffen, Gerald A. (Editor); Truszkowski, Walter (Editor); Ottenstein, Howard (Editor); Frost, Kenneth (Editor); Maran, Stephen (Editor); Walter, Lou (Editor); Brown, Mitch (Editor)
1995-01-01
The main theme of this edition of the annual Research and Technology Report is Mission Operations and Data Systems. Shifting from centralized to distributed mission operations, and from human interactive operations to highly automated operations is reported. The following aspects are addressed: Mission planning and operations; TDRSS, Positioning Systems, and orbit determination; hardware and software associated with Ground System and Networks; data processing and analysis; and World Wide Web. Flight projects are described along with the achievements in space sciences and earth sciences. Spacecraft subsystems, cryogenic developments, and new tools and capabilities are also discussed.
Kreofsky, Beth L H; Blegen, R Nicole; Lokken, Troy G; Kapraun, Susan M; Bushman, Matthew S; Demaerschalk, Bart M
2018-04-16
Telemedicine services in medical institutions are often developed in isolation of one another and not as part of a comprehensive telemedicine program. The Center for Connected Care is the administrative home for a broad range of telehealth services at Mayo Clinic. This article speaks of real-time video services, referenced as telemedicine throughout. This article discusses how a large healthcare system designed and built the infrastructure to support a comprehensive telemedicine practice. Based on analysis of existing services, Mayo Clinic developed a multifaceted operational plan that addressed high-priority areas and outlined clear roles and responsibilities of the Center for Connected Care and that of the clinical departments. The plan set priorities and a direction that would lead to long-term success. The plan articulated the governing and operational infrastructure necessary to support telemedicine by defining the role of the Center for Connected Care as the owner of core administrative operations and the role of the clinical departments as the owners of clinical telemedicine services. Additional opportunities were identified to develop product selection processes, implementation services, and staffing models that would be applied to ensure successful telemedicine deployment. The telemedicine team within the Center for Connected Care completed 45 business cases resulting in 54 implementations. The standardization of core products along with key operational offerings around implementation services, and the establishment of a 24/7 support model resulted in improved provider satisfaction and fewer reported technical issues. The foundation for long-term scalability and growth was developed by centralizing operations of telemedicine services, implementing sustainable processes, employing dedicated qualified personnel, and deploying robust products.
Mastering the management system.
Kaplan, Robert S; Norton, David P
2008-01-01
Companies have always found it hard to balance pressing operational concerns with long-term strategic priorities. The tension is critical: World-class processes won't lead to success without the right strategic direction, and the best strategy in the world will get nowhere without strong operations to execute it. In this article, Kaplan, of Harvard Business School, and Norton, founder and director of the Palladium Group, explain how to effectively manage both strategy and operations by linking them tightly in a closed-loop management system. The system comprises five stages, beginning with strategy development, which springs from a company's mission, vision, and value statements, and from an analysis of its strengths, weaknesses, and competitive environment. In the next stage, managers translate the strategy into objectives and initiatives with strategy maps, which organize objectives by themes, and balanced scorecards, which link objectives to performance metrics. Stage three involves creating an operational plan to accomplish the objectives and initiatives; it includes targeting process improvements and preparing sales, resource, and capacity plans and dynamic budgets. Managers then put plans into action, monitoring their effectiveness in stage four. They review operational, environmental, and competitive data; assess progress; and identify barriers to execution. In the final stage, they test the strategy, analyzing cost, profitability, and correlations between strategy and performance. If their underlying assumptions appear faulty, they update the strategy, beginning another loop. The authors present not only a comprehensive blueprint for successful strategy execution but also a managerial tool kit, illustrated with examples from HSBC Rail, Cigna Property and Casualty, and Store 24. The kit incorporates leading management experts' frameworks, outlining where they fit into the management cycle.
The role of the production scheduling system in rescheduling
NASA Astrophysics Data System (ADS)
Kalinowski, K.; Grabowik, C.; Kempa, W.; Paprocka, I.
2015-11-01
The paper presents the rescheduling problem in the context of cooperation between production scheduling system (PSS) and other units in an integrated manufacturing environment - decision makers and software systems. The main aim is to discuss the PSS functionality for maximizing automation of the rescheduling process, reducing the response time and improving the quality of generated solutions. PSSs operate in the meeting of tactical and operational level of planning and control, and play an important role in the production preparation and control. On the basis of information about orders, technology and production system state (e.g. resources availability) they prepare and/or update a detailed plan of production flow - a schedule. All necessary data for scheduling and rescheduling are usually collected in other systems both from organizational and technical production preparation, e.g. ERP, PLM, MES, CAPP or others, as well as they are entered directly by the decision- makers/operators. Data acquired in this way are often incomplete and inconsistent. Therefore the existing rescheduling software works according to interactive method - rather support but does not replace the human decision maker in tasks planning. When rescheduling, due to the limited amount of time to make a decision this interaction is particularly important. An additional problem arises in data acquisition, in the process of data exchanging between systems or in the identification of new data sources and their processing. Different approaches to rescheduling were characterized, including those solutions, where all these operations are carried out by an autonomous system and those in which scheduling is performed only upon request from the outside, for the newly created scheduling data representing the current state of the production system.
40 CFR 63.1187 - What do I need to know about operations, maintenance, and monitoring plans?
Code of Federal Regulations, 2010 CFR
2010-07-01
... operations, maintenance, and monitoring plans? 63.1187 Section 63.1187 Protection of Environment... about operations, maintenance, and monitoring plans? (a) An operations, maintenance, and monitoring plan... title V permit. (b) The operations, maintenance, and monitoring plan must include the following: (1...
Chen, T N; Yin, X T; Li, X G; Zhao, J; Wang, L; Mu, N; Ma, K; Huo, K; Liu, D; Gao, B Y; Feng, H; Li, F
2018-05-08
Objective: To explore the clinical and teaching application value of virtual reality technology in preoperative planning and intraoperative guide of glioma located in central sulcus region. Method: Ten patients with glioma in the central sulcus region were proposed to surgical treatment. The neuro-imaging data, including CT, CTA, DSA, MRI, fMRI were input to 3dgo sczhry workstation for image fusion and 3D reconstruction. Spatial relationships between the lesions and the surrounding structures on the virtual reality image were obtained. These images were applied to the operative approach design, operation process simulation, intraoperative auxiliary decision and the training of specialist physician. Results: Intraoperative founding of 10 patients were highly consistent with preoperative simulation with virtual reality technology. Preoperative 3D reconstruction virtual reality images improved the feasibility of operation planning and operation accuracy. This technology had not only shown the advantages for neurological function protection and lesion resection during surgery, but also improved the training efficiency and effectiveness of dedicated physician by turning the abstract comprehension to virtual reality. Conclusion: Image fusion and 3D reconstruction based virtual reality technology in glioma resection is helpful for formulating the operation plan, improving the operation safety, increasing the total resection rate, and facilitating the teaching and training of the specialist physician.
Applications for General Purpose Command Buffers: The Emergency Conjunction Avoidance Maneuver
Scheid, Robert J; England, Martin
2016-01-01
A case study is presented for the use of Relative Operation Sequence (ROS) command buffers to quickly execute a propulsive maneuver to avoid a collision with space debris. In this process, a ROS is custom-built with a burn time and magnitude, uplinked to the spacecraft, and executed in 15 percent of the time of the previous method. This new process provides three primary benefits. First, the planning cycle can be delayed until it is certain a burn must be performed, reducing team workload. Second, changes can be made to the burn parameters almost up to the point of execution while still allowing the normal uplink product review process, reducing the risk of leaving the operational orbit because of outdated burn parameters, and minimizing the chance of accidents from human error, such as missed commands, in a high-stress situation. Third, the science impacts can be customized and minimized around the burn, and in the event of an abort can be eliminated entirely in some circumstances. The result is a compact burn process that can be executed in as few as four hours and can be aborted seconds before execution. Operational, engineering, planning, and flight dynamics perspectives are presented, as well as a functional overview of the code and workflow required to implement the process. Future expansions and capabilities are also discussed.
Laboratory Tests on Post-Filtration Precipitation in the WTP Pretreatment Process
DOE Office of Scientific and Technical Information (OSTI.GOV)
Russell, Renee L.; Peterson, Reid A.; Rinehart, Donald E.
Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed, and operated as part of a plan to respond to issue M12, "Undemonstrated Leaching Processes," of the External Flowsheet Review Team (EFRT) issue response plan (Barnes et al. 2006). The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, andmore » slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. A simplified flow diagram of the PEP system is shown in Figure 1.1. Two operating scenarios are currently being evaluated for the ultrafiltration process (UFP) and leaching operations. The first scenario has caustic leaching performed in the UFP-2 ultrafiltration feed vessels (i.e., vessel UFP-VSL-T02A in the PEP; and vessels UFP-VSL-00002A and B in the WTP PTF). The second scenario has caustic leaching conducted in the UFP-1 ultrafiltration feed preparation vessels (i.e., vessels UFP-VSL-T01A and B in the PEP; vessels UFP-VSL-00001A and B in the WTP PTF).« less
Disaster recovery plan for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adams, D.E.
The BMS production implementation will be complete by October 1, 1998 and the server environment will be comprised of two types of platforms. The PassPort Supply and the PeopleSoft Financials will reside on LNIX servers and the PeopleSoft Human Resources and Payroll will reside on Microsoft NT servers. Because of the wide scope and the requirements of the COTS products to run in various environments backup and recovery responsibilities are divided between two groups in Technical Operations. The Central Computer Systems Management group provides support for the LTNIX/NT Backup Data Center, and the Network Infrastructure Systems group provides support formore » the NT Application Server Backup outside the Data Center. The disaster recovery process is dependent on a good backup and recovery process. Information and integrated system data for determining the disaster recovery process is identified from the Fluor Daniel Hanford (FDH) Risk Assessment Plan, Contingency Plan, and Backup and Recovery Plan, and Backup Form for HANDI 2000 BMS.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-05-01
The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste facilities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RFA)/RCRA Facility Investigation (RFI)/Corrective Measures Study (CMS)/Corrective Measures implementation process. Under CERCLA the actions follow the PA/SI/Remedial Investigation (RI)/Feasibility Studymore » (FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCLA into an RI work plan for the characterization of Bear Creek Valley (BCV) Operable Unit (OU) 2.« less
NASA Technical Reports Server (NTRS)
Frigm, Ryan C.; Levi, Joshua A.; Mantziaras, Dimitrios C.
2010-01-01
An operational Conjunction Assessment Risk Analysis (CARA) concept is the real-time process of assessing risk posed by close approaches and reacting to those risks if necessary. The most effective way to completely mitigate conjunction risk is to perform an avoidance maneuver. The NASA Goddard Space Flight Center has implemented a routine CARA process since 2005. Over this period, considerable experience has been gained and many lessons have been learned. This paper identifies and presents these experiences as general concepts in the description of the Conjunction Assessment, Flight Dynamics, and Flight Operations methodologies and processes. These general concepts will be tied together and will be exemplified through a case study of an actual high risk conjunction event for the Aura mission.
2014-09-25
CAPE CANAVERAL, Fla. – Operations are underway to couple Florida East Coast Railway, or FEC, locomotives No. 433 and No. 428 on the track alongside the Indian River, north of Launch Complex 39 at NASA’s Kennedy Space Center in Florida. Kennedy's Center Planning and Development Directorate has enlisted the locomotives to support a Rail Vibration Test for the Canaveral Port Authority. The purpose of the test is to collect amplitude, frequency and vibration test data utilizing two Florida East Coast locomotives operating on KSC tracks to ensure that future railroad operations will not affect launch vehicle processing at the center. Buildings instrumented for the test include the Rotation Processing Surge Facility, Thermal Protection Systems Facility, Vehicle Assembly Building, Orbiter Processing Facility and Booster Fabrication Facility. Photo credit: NASA/Daniel Casper
30 CFR 780.13 - Operation plan: Blasting.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Blasting. 780.13 Section 780.13... SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.13 Operation plan: Blasting. (a) Blasting plan. Each application shall contain a blasting plan for the proposed...
Coordinating space telescope operations in an integrated planning and scheduling architecture
NASA Technical Reports Server (NTRS)
Muscettola, Nicola; Smith, Stephen F.; Cesta, Amedeo; D'Aloisi, Daniela
1992-01-01
The Heuristic Scheduling Testbed System (HSTS), a software architecture for integrated planning and scheduling, is discussed. The architecture has been applied to the problem of generating observation schedules for the Hubble Space Telescope. This problem is representative of the class of problems that can be addressed: their complexity lies in the interaction of resource allocation and auxiliary task expansion. The architecture deals with this interaction by viewing planning and scheduling as two complementary aspects of the more general process of constructing behaviors of a dynamical system. The principal components of the software architecture are described, indicating how to model the structure and dynamics of a system, how to represent schedules at multiple levels of abstraction in the temporal database, and how the problem solving machinery operates. A scheduler for the detailed management of Hubble Space Telescope operations that has been developed within HSTS is described. Experimental performance results are given that indicate the utility and practicality of the approach.
Vanpool trip planning based on evolutionary multiple objective optimization
NASA Astrophysics Data System (ADS)
Zhao, Ming; Yang, Disheng; Feng, Shibing; Liu, Hengchang
2017-08-01
Carpool and vanpool draw a lot of researchers’ attention, which is the emphasis of this paper. A concrete vanpool operation definition is given, based on the given definition, this paper tackles vanpool operation optimization using user experience decline index(UEDI). This paper is focused on making each user having identical UEDI and the system having minimum sum of all users’ UEDI. Three contributions are made, the first contribution is a vanpool operation scheme diagram, each component of the scheme is explained in detail. The second contribution is getting all customer’s UEDI as a set, standard deviation and sum of all users’ UEDI set are used as objectives in multiple objective optimization to decide trip start address, trip start time and trip destination address. The third contribution is a trip planning algorithm, which tries to minimize the sum of all users’ UEDI. Geographical distribution of the charging stations and utilization rate of the charging stations are considered in the trip planning process.
GEOTAIL Spacecraft historical data report
NASA Technical Reports Server (NTRS)
Boersig, George R.; Kruse, Lawrence F.
1993-01-01
The purpose of this GEOTAIL Historical Report is to document ground processing operations information gathered on the GEOTAIL mission during processing activities at the Cape Canaveral Air Force Station (CCAFS). It is hoped that this report may aid management analysis, improve integration processing and forecasting of processing trends, and reduce real-time schedule changes. The GEOTAIL payload is the third Delta 2 Expendable Launch Vehicle (ELV) mission to document historical data. Comparisons of planned versus as-run schedule information are displayed. Information will generally fall into the following categories: (1) payload stay times (payload processing facility/hazardous processing facility/launch complex-17A); (2) payload processing times (planned, actual); (3) schedule delays; (4) integrated test times (experiments/launch vehicle); (5) unique customer support requirements; (6) modifications performed at facilities; (7) other appropriate information (Appendices A & B); and (8) lessons learned (reference Appendix C).
Space Station Mission Planning System (MPS) development study. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
Klus, W. J.
1987-01-01
The basic objective of the Space Station (SS) Mission Planning System (MPS) Development Study was to define a baseline Space Station mission plan and the associated hardware and software requirements for the system. A detailed definition of the Spacelab (SL) payload mission planning process and SL Mission Integration Planning System (MIPS) software was derived. A baseline concept was developed for performing SS manned base payload mission planning, and it was consistent with current Space Station design/operations concepts and philosophies. The SS MPS software requirements were defined. Also, requirements for new software include candidate programs for the application of artificial intelligence techniques to capture and make more effective use of mission planning expertise. A SS MPS Software Development Plan was developed which phases efforts for the development software to implement the SS mission planning concept.
School Data Processing Services in Texas. A Cooperative Approach. [Revised.
ERIC Educational Resources Information Center
Texas Education Agency, Austin. Management Information Center.
The Texas plan for computer services provides services to public school districts through a statewide network of 20 regional Education Service Centers (ESC). Each of the three Multi-Regional Processing Centers (MRPCs) operates a large computer facility providing school district services within from three to eight ESC regions; each of the five…
School Data Processing Services in Texas: A Cooperative Approach.
ERIC Educational Resources Information Center
Texas Education Agency, Austin.
The Texas plan for computer services provides services to public school districts through a statewide network of 20 regional Education Service Centers (ESC). Each of the three Multi-Regional Processing Centers (MRPCs) operates a large computer facility providing school district services within from three to eight ESC regions; each of the five…
School Data Processing Services in Texas: A Cooperative Approach.
ERIC Educational Resources Information Center
Texas Education Agency, Austin.
The Texas plan for computer services provides services to public school districts through a statewide network of 20 regional Education Service Centers (ESO). Each of the three Multi-Regional Processing Centers (MRPCs) operates a large computer facility providing school district services within from three to eight ESC regions each of the five…
43 CFR 1610.7-1 - Designation of areas unsuitable for surface mining.
Code of Federal Regulations, 2011 CFR
2011-10-01
... surface mining. 1610.7-1 Section 1610.7-1 Public Lands: Interior Regulations Relating to Public Lands... mining. (a)(1) The planning process is the chief process by which public land is reviewed to assess whether there are areas unsuitable for all or certain types of surface coal mining operations under...
10 CFR 436.102 - General operations plan format and content.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 3 2010-01-01 2010-01-01 false General operations plan format and content. 436.102... PROGRAMS Guidelines for General Operations Plans § 436.102 General operations plan format and content. (a... effective date of these guidelines, a general operations 10-year plan which shall consist of two parts, an...
An operations management system for the Space Station
NASA Astrophysics Data System (ADS)
Savage, Terry R.
A description is provided of an Operations Management System (OMS) for the planned NASA Space Station. The OMS would be distributed both in space and on the ground, and provide a transparent interface to the communications and data processing facilities of the Space Station Program. The allocation of OMS responsibilities has, in the most current Space Station design, been fragmented among the Communications and Tracking Subsystem (CTS), the Data Management System (DMS), and a redefined OMS. In this current view, OMS is less of a participant in the real-time processing, and more an overseer of the health and management of the Space Station operations.
Energy Systems Test Area (ESTA) Electrical Power Systems Test Operations: User Test Planning Guide
NASA Technical Reports Server (NTRS)
Salinas, Michael J.
2012-01-01
Test process, milestones and inputs are unknowns to first-time users of the ESTA Electrical Power Systems Test Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Strengthening the management of ESA - the Inter-Directorate Reform of Corporate and Risk Management
NASA Astrophysics Data System (ADS)
Feustel-Büechl, Jörg; Arend, Harald; Derio, Eric; Infante, Giovanni; Kreiner, Gerhard; Phaler, Jesse; Tabbert, Michael
2007-02-01
ESA has undertaken the Inter-Directorate Reform of Corporate and Risk Management to strengthen the Agency's internal operations. The reform was completed at the end of 2006, encompassing five dedicated projects on Risk Management, Agency-Wide Controlling System, Project Plan and Integrated Project Review, General Budget Structure and Charging Policy, and Corporate Information Systems. It has contributed to improved management of the Agency's internal operations by engaging all internal stakeholders in a common objective, introducing improvements to planning and management methods, elaborating consolidated information structures and tools, contributing to enhanced transparency and accountability, and by providing qualified new policies, processes and tools.
NASA Technical Reports Server (NTRS)
Fabinsky, Beth
2006-01-01
WISE, the Wide Field Infrared Survey Explorer, is scheduled for launch in June 2010. The mission operations system for WISE requires a software modeling tool to help plan, integrate and simulate all spacecraft pointing and verify that no attitude constraints are violated. In the course of developing the requirements for this tool, an investigation was conducted into the design of similar tools for other space-based telescopes. This paper summarizes the ground software and processes used to plan and validate pointing for a selection of space telescopes; with this information as background, the design for WISE is presented.
Williams, S. Jeffress; Foley, Mary K.
2007-01-01
4. Economic costs and benefits of artificial closure. This report for breach management presents protocols which specify when breach closures within the FIIS might be desirable and necessary, as well as provides recommendations for structural breach closure engineering operations which are indented to minimize negative impacts to the natural wilderness values and cultural resources within the FIIS, particularly the Otis Pike Wilderness Area. The goal of the plan is to strike a balance between protecting natural resources and allowing natural processes to operate and avoiding loss of life and excessive property damage.
The need for artificial intelligence as an aid in controlling a manufacturing operation
NASA Astrophysics Data System (ADS)
Weyand, J.
AI applications to industrial production and planning are discussed and illustrated with diagrams and drawings. Applications examined include flexible automation of manufacturing processes (robots with open manual control, robots programmable to meet product specifications, self-regulated robots, and robots capable of learning), flexible fault detection and diagnostics, production control, and overall planning and management (product strategies, marketing, determination of development capacity, site selection, project organization, and technology investment strategies). For the case of robots, problems in the design and operation of a state-of-the-art machine-tool cell (for hole boring, milling, and joining) are analyzed in detail.
Research and the planned Space Experiment Research and Processing Laboratory
NASA Technical Reports Server (NTRS)
2000-01-01
Original photo and caption dated August 14, 1995: 'KSC plant physiologist Dr. Gary Stutte harvests a potato grown in the Biomass Production Chamber of the Controlled environment Life Support system (CELSS) in Hangar L at Cape Canaveral Air Station. During a 418-day 'human rated' experiment, potato crops grown in the chamber provided the equivalent of a continuous supply of the oxygen for one astronaut, along with 55 percent of that long-duration space flight crew member's caloric food requirements and enough purified water for four astronauts while absorbing their expelled carbon dioxide. The experiment provided data that will help demonstarte the feasibility of the CELSS operating as a bioregenerative life support system for lunar and deep-space missions that can operate independently without the need to carry consumables such as air, water and food, while not requiring the expendable air and water system filters necessary on today's human-piloted spacecraft.' His work is an example of the type of life sciences research that will be conducted at the Space Experiment Research Procession Laboratory (SERPL). The SERPL is a planned 100,000-square-foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for a planned 400-acre Space Station Commerce Park.
Research and the planned Space Experiment Research and Processing Laboratory
NASA Technical Reports Server (NTRS)
2000-01-01
Original photo and caption dated August 14, 1995: 'KSC plant physiologist Dr. Gary Stutte (right) and Cheryl Mackowiak harvest potatoes grown in the Biomass Production Chamber of the Controlled Enviornment Life Support System (CELSS in Hangar L at Cape Canaveral Air Station. During a 418-day 'human rated' experiment, potato crops grown in the chamber provided the equivalent of a continuous supply of the oxygen for one astronaut, along with 55 percent of that long-duration space flight crew member's caloric food requirements and enough purified water for four astronauts while absorbing their expelled carbon dioxide. The experiment provided data that will help demonstarte the feasibility of the CELSS operating as a bioregenerative life support system for lunar and deep-space missions that can operate independently without the need to carry consumables such as air, water and food, while not requiring the expendable air and water system filters necessary on today's human-piloted spacecraft.' Their work is an example of the type of life sciences research that will be conducted at the Space Experiment Research Procession Laboratory (SERPL). The SERPL is a planned 100,000-square-foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for a planned 400-acre Space Station Commerce Park.
Yap, Glenn A; Platonova, Elena A; Musa, Philip F
2006-02-01
An exploratory study used Ansoff's strategic planning model as a framework to assess perceived effectiveness of information systems in supporting strategic business plan development at Air Force medical treatment facilities (MTFs). Results showed information systems were most effective in supporting historical trend analysis, strategic business plans appeared to be a balance of operational and strategic plans, and facilities perceived a greater need for new clinical, vice administrative, information systems to support strategic planning processes. Administrators believed information systems should not be developed at the local level and perceived information systems have the greatest impact on improving clinical quality outcomes, followed by ability to deliver cost effective care and finally, ability to increase market share.
NASA Technical Reports Server (NTRS)
Hornstein, Rhoda S.; Willoughby, John K.; Gardner, Jo A.; Shinkle, Gerald L.
1993-01-01
In 1992, NASA made the decision to evolve a Consolidated Planning System (CPS) by adding the Space Transportation System (STS) requirements to the Space Station Freedom (SSF) planning software. This paper describes this evolutionary process, which began with a series of six-month design-build-test cycles, using a domain-independent architecture and a set of developmental tools known as the Advanced Scheduling Environment. It is shown that, during these tests, the CPS could be used at multiple organizational levels of planning and for integrating schedules from geographically distributed (including international) planning environments. The potential for using the CPS for other planning and scheduling tasks in the SSF program is being currently examined.
Research and Technology Report. Goddard Space Flight Center
NASA Technical Reports Server (NTRS)
Soffen, Gerald (Editor); Truszkowski, Walter (Editor); Ottenstein, Howard (Editor); Frost, Kenneth (Editor); Maran, Stephen (Editor); Walter, Lou (Editor); Brown, Mitch (Editor)
1996-01-01
This issue of Goddard Space Flight Center's annual report highlights the importance of mission operations and data systems covering mission planning and operations; TDRSS, positioning systems, and orbit determination; ground system and networks, hardware and software; data processing and analysis; and World Wide Web use. The report also includes flight projects, space sciences, Earth system science, and engineering and materials.
ERIC Educational Resources Information Center
Mousikou, Petroula; Rastle, Kathleen; Besner, Derek; Coltheart, Max
2015-01-01
Dual-route theories of reading posit that a sublexical reading mechanism that operates serially and from left to right is involved in the orthography-to-phonology computation. These theories attribute the masked onset priming effect (MOPE) and the phonological Stroop effect (PSE) to the serial left-to-right operation of this mechanism. However,…
EP-DRAFT-1.1 2014-01-19 OSI-GAM-SOP-00x In Situ High-resolution Gamma Spectroscopy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wimer, N. G.; Kreek, S. A.
2014-01-27
The standard operating procedure is described for in situ high-resolution gamma spectroscopy, including operational readiness, planning, preparation, conduct, and reporting. Data analysis of in situ gamma spectrum files will be performed together with those of other gamma assay methods by a dedicated Data Analysis process, documented in companion OSI procedures.