Sample records for optimizing dam operations

  1. Better Redd than Dead: Optimizing Reservoir Operations for Wild Fish Survival During Drought

    NASA Astrophysics Data System (ADS)

    Adams, L. E.; Lund, J. R.; Quiñones, R.

    2014-12-01

    Extreme droughts are difficult to predict and may incur large economic and ecological costs. Dam operations in drought usually consider minimizing economic costs. However, dam operations also offer an opportunity to increase wild fish survival under difficult conditions. Here, we develop a probabilistic optimization approach to developing reservoir release schedules to maximize fish survival in regulated rivers. A case study applies the approach to wild Fall-run Chinook Salmon below Folsom Dam on California's American River. Our results indicate that releasing more water early in the drought will, on average, save more wild fish over the long term.

  2. Optimization of Multiple and Multipurpose Reservoir System Operations by Using Matrix Structure (Case Study: Karun and Dez Reservoir Dams)

    PubMed Central

    Othman, Faridah; Taghieh, Mahmood

    2016-01-01

    Optimal operation of water resources in multiple and multipurpose reservoirs is very complicated. This is because of the number of dams, each dam’s location (Series and parallel), conflict in objectives and the stochastic nature of the inflow of water in the system. In this paper, performance optimization of the system of Karun and Dez reservoir dams have been studied and investigated with the purposes of hydroelectric energy generation and providing water demand in 6 dams. On the Karun River, 5 dams have been built in the series arrangements, and the Dez dam has been built parallel to those 5 dams. One of the main achievements in this research is the implementation of the structure of production of hydroelectric energy as a function of matrix in MATLAB software. The results show that the role of objective function structure for generating hydroelectric energy in weighting method algorithm is more important than water supply. Nonetheless by implementing ε- constraint method algorithm, we can both increase hydroelectric power generation and supply around 85% of agricultural and industrial demands. PMID:27248152

  3. Sluiceway Operations to Pass Juvenile Salmonids at The Dalles Dam, Columbia River, USA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.; Khan, Fenton; Skalski, J. R.

    Existing ice and trash sluiceways are commonly used to pass juvenile salmonids downstream at hydropower dams through a benign, non-turbine route. At The Dalles Dam on the Columbia River, managers undertook optimizing operations of sluiceway weirs to maximize survival of juvenile salmonids at the powerhouse. We applied fixed-location hydroacoustic methods to compare fish passage rates and sluiceway efficiencies for two weir configurations during 2004 and 2005: three weirs versus six weirs, located at the mid- versus east powerhouse, respectively. We also analyzed horizontal distributions of passage at the sluiceway and turbines and the effects of operating turbines beneath open sluicewaymore » gates to provide supporting data relevant to operations optimization. Based on the findings, we recommend the following for long-term operations for the sluiceway at The Dalles Dam: open six rather than three sluiceway weirs to take advantage of the maximum hydraulic capacity of the sluiceway; open the three weirs above the western-most operating main turbine unit (MU) and the three weirs at MU 8 where turbine passage rates are relatively high; operate the turbine units below open sluiceway weirs as a standard procedure; operate the sluiceway 24 h/d year-round to maximize its benefits to juvenile salmonids; and use the same operations for spring and summer emigrants. These operational concepts are transferable to dams where sluiceway surface flow outlets are used protect downstream migrating fishes.« less

  4. Mathematical Modeling in Systems for Operational Evaluation of the Stress-Strain State of the Arch-Gravity Dam at the Sayano-Shushenskaya Hydroelectric Power Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bellendir, E. N.; Gordon, L. A., E-mail: lev-gordon@mail.ru; Khrapkov, A. A.

    Current studies of the stress-strain state of the dam at the Sayano-Shushenskaya Hydroelectric Power Plant at VNIIG based on mathematical modeling including full scale and experimental data are described. Applications and programs intended for automatic operational evaluation of the stress-strain state of the dam for optimizing control of the upper race level in the course of the annual filling-drawdown cycle and during seismic events are examined. Improvements in systems for monitoring the stress-strain state of concrete dams are proposed.

  5. Review on applications of artificial intelligence methods for dam and reservoir-hydro-environment models.

    PubMed

    Allawi, Mohammed Falah; Jaafar, Othman; Mohamad Hamzah, Firdaus; Abdullah, Sharifah Mastura Syed; El-Shafie, Ahmed

    2018-05-01

    Efficacious operation for dam and reservoir system could guarantee not only a defenselessness policy against natural hazard but also identify rule to meet the water demand. Successful operation of dam and reservoir systems to ensure optimal use of water resources could be unattainable without accurate and reliable simulation models. According to the highly stochastic nature of hydrologic parameters, developing accurate predictive model that efficiently mimic such a complex pattern is an increasing domain of research. During the last two decades, artificial intelligence (AI) techniques have been significantly utilized for attaining a robust modeling to handle different stochastic hydrological parameters. AI techniques have also shown considerable progress in finding optimal rules for reservoir operation. This review research explores the history of developing AI in reservoir inflow forecasting and prediction of evaporation from a reservoir as the major components of the reservoir simulation. In addition, critical assessment of the advantages and disadvantages of integrated AI simulation methods with optimization methods has been reported. Future research on the potential of utilizing new innovative methods based AI techniques for reservoir simulation and optimization models have also been discussed. Finally, proposal for the new mathematical procedure to accomplish the realistic evaluation of the whole optimization model performance (reliability, resilience, and vulnerability indices) has been recommended.

  6. Trading river services: optimizing dam decisions at the basin scale to improve socio-ecological resilience

    NASA Astrophysics Data System (ADS)

    Roy, S. G.; Gold, A.; Uchida, E.; McGreavy, B.; Smith, S. M.; Wilson, K.; Blachly, B.; Newcomb, A.; Hart, D.; Gardner, K.

    2017-12-01

    Dam removal has become a cornerstone of environmental restoration practice in the United States. One outcome of dam removal that has received positive attention is restored access to historic habitat for sea-run fisheries, providing a crucial gain in ecosystem resilience. But dams also provide stakeholders with valuable services, and uncertain socio-ecological outcomes can arise if there is not careful consideration of the basin scale trade offs caused by dam removal. In addition to fisheries, dam removals can significantly affect landscape nutrient flux, municipal water storage, recreational use of lakes and rivers, property values, hydroelectricity generation, the cultural meaning of dams, and many other river-based ecosystem services. We use a production possibility frontiers approach to explore dam decision scenarios and opportunities for trading between ecosystem services that are positively or negatively affected by dam removal in New England. Scenarios that provide efficient trade off potentials are identified using a multiobjective genetic algorithm. Our results suggest that for many river systems, there is a significant potential to increase the value of fisheries and other ecosystem services with minimal dam removals, and further increases are possible by including decisions related to dam operations and physical modifications. Run-of-river dams located near the head of tide are often found to be optimal for removal due to low hydroelectric capacity and high impact on fisheries. Conversely, dams with large impoundments near a river's headwaters can be less optimal for dam removal because their value as nitrogen sinks often outweighs the potential value for fisheries. Hydropower capacity is negatively impacted by dam removal but there are opportunities to meet or exceed lost capacity by upgrading preserved hydropower dams. Improving fish passage facilities for dams that are critical for safety or water storage can also reduce impacts on fisheries. Our method is helpful for identifying efficient decision scenarios, but finding the optimal decision requires a deep and mutual understanding of stakeholder preferences. We outline how to interpret these preferences, identify overlaps with the efficient decision scenarios, and estimate the monetary budget required to act on these decisions.

  7. Development of probabilistic operating rules for Hluhluwe Dam, South Africa

    NASA Astrophysics Data System (ADS)

    Ndiritu, J.; Odiyo, J.; Makungo, R.; Mwaka, B.; Mthethwa, N.; Ntuli, C.; Andanje, A.

    2017-08-01

    Hluhluwe Dam, with a 30 million m3 reservoir that supplies water for irrigation and Hluhluwe municipality in Kwa-Zulu Natal Province, South Africa, was consistently experiencing low storage levels over several non-drought years since 2001. The dam was operated by rules of thumb and there were no records of water releases for irrigation - the main user of the dam. This paper describes an assessment of the historic behaviour of the reservoir since its completion in 1964 and the development of operating rules that accounted for: i) the multiple and different levels of reliability at which municipal and irrigation demands need to be supplied, and ii) inter-annual and inter-decadal variability of climate and inflows into the dam. The assessment of the behaviour of the reservoir was done by simulation assuming trigonometric rule curves that were optimized to maximize both yield and storage state using the SCE-UA method. The resulting reservoir behaviour matched the observed historic trajectory reasonably well and indicated that the dam has mainly been operated at a demand of 10 million m3/year until 2000 when the demand suddenly rose to 25 million m3/year. Operating rules were developed from a statistical analysis of the base yields from 500 simulations of the reservoir each using 5 year-long stochastically generated sequences of inflows, rainfall and evaporation. After the implementation of the operating rules in 2009, the storage state of the dam improved and matched those of other reservoirs in the region that had established operating rules.

  8. Sluiceway Operations for Adult Steelhead Downstream Passage at The Dalles Dam, Columbia River, USA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Khan, Fenton; Royer, Ida M.; Johnson, Gary E.

    2013-10-01

    This study evaluated adult steelhead (Oncorhynchus mykiss; fallbacks and kelts) downstream passage at The Dalles Dam in the Columbia River, USA, during the late fall, winter, and early spring months between 2008 and 2011. The purpose of the study was to determine the efficacy of operating the dam’s ice-and-trash sluiceway during non-spill months to provide a relatively safe, non-turbine, surface outlet for overwintering steelhead fallbacks and downstream migrating steelhead kelts. We applied the fixed-location hydroacoustic technique to estimate fish passage rates at the sluiceway and turbines of the dam. The spillway was closed during our sampling periods, which generally occurredmore » in late fall, winter, and early spring. The sluiceway was highly used by adult steelhead (91–99% of total fish sampled passing the dam) during all sampling periods. Turbine passage was low when the sluiceway was not operated. This implies that lack of a sluiceway route did not result in increased turbine passage. However, when the sluiceway was open, adult steelhead used it to pass through the dam. The sluiceway may be operated during late fall, winter, and early spring to provide an optimal, non-turbine route for adult steelhead (fallbacks and kelts) downstream passage at The Dalles Dam.« less

  9. Dam pre-release as an important operation strategy in reducing flood impact in Malaysia

    NASA Astrophysics Data System (ADS)

    Hidayah Ishak, Nurul; Mustafa Hashim, Ahmad

    2018-03-01

    The 2014 flood was reported to be one of the worst natural disaster has ever affected several states in the northern part of Peninsular Malaysia. Overwhelming rainfall was noted as one of the main factors causing such impact, which was claimed to be unprecedented to some extent. The state of Perak, which is blessed with four cascading dams had also experienced flood damage at a scale that was considered the worst in history. The rainfall received had caused the dam to reach danger level that necessitated additional discharge to be released. Safety of the dams was of great importance and such unavoidable additional discharge was allowed to avoid catastrophic failure of the dam structures. This paper discusses the dam pre-release as a significant dam management strategy in reducing flood impact. An important balance between required dam storage to be maintained and the risk element that can be afforded is the crucial factor in such enhanced operation strategy. While further possibility in developing a carefully engineered dam pre-release strategy can be explored for dam operation in Malaysia, this has already been introduced in some developed countries. Australia and South Africa are examples where pre-release has been practiced and proven to reduce flood risk. The concept involves controlling the dam lake level throughout the year, in reference to the rainfall data and the hydrological properties for the catchment area of the dams. Plentiful data analysis need to be done in contemplation of producing the optimal pre-release model. The amount of heavy rainfalls received is beyond human control but the distribution of the discharge from the dams can be further managed with the appropriate pre-release strategy.

  10. Modeling Total Dissolved Gas for Optimal Operation of Multireservoir Systems

    DOE PAGES

    Politano, Marcela; Castro, Alejandro; Hadjerioua, Boualem

    2017-02-09

    One important environmental issue of hydropower in the Columbia and Snake River Basins (Pacific Northwest region of United States) is elevated total dissolved gas (TDG) downstream of a dam, which has the potential to cause gas bubble disease in affected fish. Gas supersaturation in the Columbia River Basin primarily occurs due to dissolution of bubbles entrained during spill events. This paper presents a physically based TDG model that can be used to optimize spill operations in multireservoir hydropower systems. Independent variables of the model are forebay TDG, tailwater elevation, spillway and powerhouse discharges, project head, and environmental parameters such asmore » temperature and atmospheric pressure. The model contains seven physically meaningful experimental parameters, which were calibrated and validated against TDG data collected downstream of Rock Island Dam (Washington) from 2008 to 2012. In conclusion, a sensitivity analysis was performed to increase the understanding of the relationships between TDG downstream of the dam and processes such as air entrainment, lateral powerhouse flow, and dissolution.« less

  11. Effects of Outlets on Cracking Risk and Integral Stability of Super-High Arch Dams

    PubMed Central

    Hu, Hang

    2014-01-01

    In this paper, case study on outlet cracking is first conducted for the Goupitan and Xiaowan arch dams. A nonlinear FEM method is then implemented to study effects of the outlets on integral stability of the Xiluodu arch dam under two loading conditions, i.e., normal loading and overloading conditions. On the basis of the case study and the numerical modelling, the outlet cracking mechanism, risk, and corresponding reinforcement measures are discussed. Furthermore, the numerical simulation reveals that (1) under the normal loading conditions, the optimal distribution of the outlets will contribute to the tensile stress release in the local zone of the dam stream surface and decrease the outlet cracking risk during the operation period. (2) Under the overloading conditions, the cracks initiate around the outlets, then propagate along the horizontal direction, and finally coalesce with those in adjacent outlets, where the yield zone of the dam has a shape of butterfly. Throughout this study, a dam outlet cracking risk control and reinforcement principle is proposed to optimize the outlet design, select the appropriate concrete material, strengthen the temperature control during construction period, design reasonable impounding scheme, and repair the cracks according to their classification. PMID:25152907

  12. Mutually beneficial and sustainable management of Ethiopian and Egyptian dams in the Nile Basin

    NASA Astrophysics Data System (ADS)

    Habteyes, Befekadu G.; Hasseen El-bardisy, Harb A. E.; Amer, Saud A.; Schneider, Verne R.; Ward, Frank A.

    2015-10-01

    Ongoing pressures from population growth, recurrent drought, climate, urbanization and industrialization in the Nile Basin raise the importance of finding viable measures to adapt to these stresses. Four tributaries of the Eastern Nile Basin contribute to supplies: the Blue Nile (56%), White Nile-Albert (14%), Atbara (15%) and Sobat (15%). Despite much peer reviewed work addressing conflicts on the Nile, none to date has quantitatively examined opportunities for discovering benefit sharing measures that could protect negative impacts on downstream water users resulting from new upstream water storage developments. The contribution of this paper is to examine the potential for mutually beneficial and sustainable benefit sharing measures from the development and operation of the Grand Ethiopian Renaissance Dam while protecting baseline flows to the downstream countries including flows into the Egyptian High Aswan Dam. An integrated approach is formulated to bring the hydrology, economics and institutions of the region into a unified framework for policy analysis. A dynamic optimization model is developed and applied to identify the opportunities for Pareto Improving measures to operate these two dams for the four Eastern Nile Basin countries: Ethiopia, South Sudan, Sudan, and Egypt. Results indicate a possibility for one country to be better off (Ethiopia) and no country to be worse off from a managed operation of these two storage facilities. Still, despite the optimism of our results, considerable diplomatic negotiation among the four riparians will be required to turn potential gains into actual welfare improvements.

  13. A multi-year analysis of spillway survival for juvenile salmonids as a function of spill bay operations at McNary Dam, Washington and Oregon, 2004-09

    USGS Publications Warehouse

    Adams, Noah S.; Hansel, Hal C.; Perry, Russell W.; Evans, Scott D.

    2012-01-01

    We analyzed 6 years (2004-09) of passage and survival data collected at McNary Dam to examine how spill bay operations affect survival of juvenile salmonids passing through the spillway at McNary Dam. We also examined the relations between spill bay operations and survival through the juvenile fish bypass in an attempt to determine if survival through the bypass is influenced by spill bay operations. We used a Cormack-Jolly-Seber release-recapture model (CJS model) to determine how the survival of juvenile salmonids passing through McNary Dam relates to spill bay operations. Results of these analyses, while not designed to yield predictive models, can be used to help develop dam-operation strategies that optimize juvenile salmonid survival. For example, increasing total discharge typically had a positive effect on both spillway and bypass survival for all species except sockeye salmon (Oncorhynchus nerka). Likewise, an increase in spill bay discharge improved spillway survival for yearling Chinook salmon (Oncorhynchus tshawytscha), and an increase in spillway discharge positively affected spillway survival for juvenile steelhead (Oncorhynchus mykiss). The strong linear relation between increased spill and increased survival indicates that increasing the amount of water through the spillway is one strategy that could be used to improve spillway survival for yearling Chinook salmon and juvenile steelhead. However, increased spill did not improve spillway survival for subyearling Chinook salmon and sockeye salmon. Our results indicate that a uniform spill pattern would provide the highest spillway survival and bypass survival for subyearling Chinook salmon. Conversely, a predominantly south spill pattern provided the highest spillway survival for yearling Chinook salmon and juvenile steelhead. Although spill pattern was not a factor for spillway survival of sockeye salmon, spill bay operations that optimize passage through the north and south spill bays maximized spillway survival for this species. Bypass survival of yearling Chinook salmon could be improved by optimizing conditions to facilitate bypass passage at night, but the method to do so is not apparent from this analysis because photoperiod was the only factor affecting bypass survival based on the best and only supported model. Bypass survival of juvenile steelhead would benefit from lower water temperatures and increased total and spillway discharge. Likewise, subyearling Chinook salmon bypass survival would improve with lower water temperatures, increased total discharge, and a uniform spill pattern.

  14. Audit Technical of Kori Rubber Dam in the River of Keyang District of Ponorogo East Java Province

    NASA Astrophysics Data System (ADS)

    Murnianto, E.; Suprapto, M.; Ikhsan, C.

    2018-03-01

    The development of science and technology for the utilization and protection of rivers has embodied various types of river infrastructure. Without proper maintenance, rapid river sediments undergo physical degradation and function. Problems that occur in Kori Rubber Dam, among others, the damage to the body of the rubber dam that is made of rubber, so that the function of flower deflection is not optimal. This happens because of limited operational and maintenance activities (OM). A technical audit is a process of identifying problems, analyzing, and evaluating ones conducted independently, objectively and professionally on the basis of examination, to assess the truth, accuracy, credibility, and reliability of information about a job. In this case an assessment of the Kori Rubber Dam, which is basically a benchmarking activity. Assessment of rubber dam components includes the physical conditions and functions that affect the weir. This research is expected to know the performance of Kori rubber Dam as a recommendation material in the implementation of OM Rubber Dam activities.

  15. Improved Algorithms for Blending Dam Releases to Meet Downstream Water-Temperature Targets in the CE-QUAL-W2 Water-Quality Model

    NASA Astrophysics Data System (ADS)

    Rounds, S. A.; Buccola, N. L.

    2014-12-01

    The two-dimensional (longitudinal, vertical) water-quality model CE-QUAL-W2, version 3.7, was enhanced with new features to help dam operators and managers efficiently explore and optimize potential solutions for temperature management downstream of thermally stratified reservoirs. Such temperature management often is accomplished by blending releases from multiple dam outlets that access water of different temperatures at different depths in the reservoir. The original blending algorithm in this version of the model was limited to mixing releases from two outlets at a time, and few constraints could be imposed. The new enhanced blending algorithm allows the user to (1) specify a time-series of target release temperatures, (2) designate from 2 to 10 floating or fixed-elevation outlets for blending, (3) impose maximum head constraints as well as minimum and maximum flow constraints for any blended outlet, and (4) set a priority designation for each outlet that allows the model to choose which outlets to use and how to balance releases among them. The modified model was tested against a previously calibrated model of Detroit Lake on the North Santiam River in northwestern Oregon, and the results compared well. The enhanced model code is being used to evaluate operational and structural scenarios at multiple dam/reservoir systems in the Willamette River basin in Oregon, where downstream temperature management for endangered fish is a high priority for resource managers and dam operators. These updates to the CE-QUAL-W2 blending algorithm allow scenarios involving complicated dam operations and/or hypothetical outlet structures to be evaluated more efficiently with the model, with decreased need for multiple/iterative model runs or preprocessing of model inputs to fully characterize the operational constraints.

  16. Many-objective reservoir policy identification and refinement to reduce policy inertia and myopia in water management

    NASA Astrophysics Data System (ADS)

    Giuliani, M.; Herman, J. D.; Castelletti, A.; Reed, P.

    2014-04-01

    This study contributes a decision analytic framework to overcome policy inertia and myopia in complex river basin management contexts. The framework combines reservoir policy identification, many-objective optimization under uncertainty, and visual analytics to characterize current operations and discover key trade-offs between alternative policies for balancing competing demands and system uncertainties. The approach is demonstrated on the Conowingo Dam, located within the Lower Susquehanna River, USA. The Lower Susquehanna River is an interstate water body that has been subject to intensive water management efforts due to competing demands from urban water supply, atomic power plant cooling, hydropower production, and federally regulated environmental flows. We have identified a baseline operating policy for the Conowingo Dam that closely reproduces the dynamics of current releases and flows for the Lower Susquehanna and thus can be used to represent the preferences structure guiding current operations. Starting from this baseline policy, our proposed decision analytic framework then combines evolutionary many-objective optimization with visual analytics to discover new operating policies that better balance the trade-offs within the Lower Susquehanna. Our results confirm that the baseline operating policy, which only considers deterministic historical inflows, significantly overestimates the system's reliability in meeting the reservoir's competing demands. Our proposed framework removes this bias by successfully identifying alternative reservoir policies that are more robust to hydroclimatic uncertainties while also better addressing the trade-offs across the Conowingo Dam's multisector services.

  17. Lost opportunities and future avenues to reconcile hydropower and sediment transport in the Mekong Basin through optimal sequencing of dam portfolios.

    NASA Astrophysics Data System (ADS)

    Castelletti, A.; Schmitt, R. J. P.; Bizzi, S.; Kondolf, G. M.

    2017-12-01

    Dams are essential to meet growing water and energy demands. While dams cumulatively impact downstream rivers on network-scales, dam development is mostly based on ad-hoc economic and environmental assessments of single dams. Here, we provide evidence that replacing this ad-hoc approach with early strategic planning of entire dam portfolios can greatly reduce conflicts between economic and environmental objectives of dams. In the Mekong Basin (800,000km2), 123 major dam sites (status-quo: 56 built and under construction) could generate 280,000 GWh/yr of hydropower. Cumulatively, dams risk interrupting the basin's sediment dynamics with severe impacts on livelihoods and eco-systems. To evaluate cumulative impacts and benefits of the ad-hoc planned status-quo portfolio, we combine the CASCADE sediment connectivity model with data on hydropower production and sediment trapping at each dam site. We couple CASCADE to a multi-objective genetic algorithm (BORG) identifying a) portfolios resulting in an optimal trade-off between cumulative sediment trapping and hydropower production and b) an optimal development sequence for each portfolio. We perform this analysis first for the pristine basin (i.e., without pre-existing dams) and then starting from the status-quo portfolio, deriving policy recommendations for which dams should be prioritized in the near future. The status-quo portfolio creates a sub-optimal trade-off between hydropower and sediment trapping, exploiting 50 % of the basin's hydro-electric potential and trapping 60 % of the sediment load. Alternative optimal portfolios could have produced equivalent hydropower for 30 % sediment trapping. Imminent development of mega-dams in the lower basin will increase hydropower production by 20 % but increase sediment trapping to >90 %. In contrast, following an optimal development sequence can still increase hydropower by 30 % with limited additional sediment trapping by prioritizing dams in upper parts of the basin. Our findings argue for reconsidering some imminent dam developments in the Mekong. With nearly 3000 dams awaiting development world-wide, results from the Mekong are of global importance, demonstrating that strategic planning and sequencing of dams is instrumental for sustainable development of dams and hydropower.

  18. Optimization of Concurrent Deployments of the Juvenile Salmon Acoustic Telemetry System and Other Hydroacoustic Equipment at John Day Dam

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ploskey, Gene R.; Hughes, James S.; Khan, Fenton

    The purpose of this report is to document the results of the acoustic optimization study conducted at John Day Dam during January and February 2008. The goal of the study was to optimize performance of the Juvenile Salmon Acoustic Telemetry System (JSATS) by determining deployment and data acquisition methods to minimize electrical and acoustic interference from various other acoustic sampling devices. Thereby, this would allow concurrent sampling by active and passive acoustic methods during the formal evaluations of the prototype surface flow outlets at the dam during spring and summer outmigration seasons for juvenile salmonids. The objectives for the optimizationmore » study at John Day Dam were to: 1. Design and test prototypes and provide a total needs list of pipes and trolleys to deploy JSATS hydrophones on the forebay face of the powerhouse and spillway. 2. Assess the effect on mean percentage decoded of JSATS transmissions from tags arrayed in the forebay and detected on the hydrophones by comparing: turbine unit OFF vs. ON; spill bay OPEN vs. CLOSED; dual frequency identification sonar (DIDSON) and acoustic Doppler current profiler (ADCP) both OFF vs. ON at a spill bay; and, fixed-aspect hydroacoustic system OFF vs. ON at a turbine unit and a spill bay. 3. Determine the relationship between fixed-aspect hydroacoustic transmit level and mean percentage of JSATS transmissions decoded. The general approach was to use hydrophones to listen for transmissions from JSATS tags deployed in vertical arrays in a series perpendicular to the face of the dam. We used acoustic telemetry equipment manufactured by Technologic and Sonic Concepts. In addition, we assessed old and new JSATS signal detectors and decoders and two different types of hydrophone baffling. The optimization study consisted of a suite of off/on tests. The primary response variable was mean percentage of tag transmissions decoded. We found that there was no appreciable adverse effect on mean percentage decoded for JSATS transmitters from: turbine operations; spillway operations; DIDSON/ADCP acoustic energy; and PAS hydroacoustic systems at transmit level of -12 dB, although there was a significant impact at all higher transmit levels (-11 to -6 dB). The main conclusion from this optimization study is that valid JSATS telemetry data can be collected simultaneously with a DIDSON/ADCP and a PAS hydroacoustic system at transmit level -12 dB. Multiple evaluation tools should be considered to increase the robustness and thoroughness of future fish passage evaluations at John Day and other dams.« less

  19. Integrated Data-Archive and Distributed Hydrological Modelling System for Optimized Dam Operation

    NASA Astrophysics Data System (ADS)

    Shibuo, Yoshihiro; Jaranilla-Sanchez, Patricia Ann; Koike, Toshio

    2013-04-01

    In 2012, typhoon Bopha, which passed through the southern part of the Philippines, devastated the nation leaving hundreds of death tolls and significant destruction of the country. Indeed the deadly events related to cyclones occur almost every year in the region. Such extremes are expected to increase both in frequency and magnitude around Southeast Asia, during the course of global climate change. Our ability to confront such hazardous events is limited by the best available engineering infrastructure and performance of weather prediction. An example of the countermeasure strategy is, for instance, early release of reservoir water (lowering the dam water level) during the flood season to protect the downstream region of impending flood. However, over release of reservoir water affect the regional economy adversely by losing water resources, which still have value for power generation, agricultural and industrial water use. Furthermore, accurate precipitation forecast itself is conundrum task, due to the chaotic nature of the atmosphere yielding uncertainty in model prediction over time. Under these circumstances we present a novel approach to optimize contradicting objectives of: preventing flood damage via priori dam release; while sustaining sufficient water supply, during the predicted storm events. By evaluating forecast performance of Meso-Scale Model Grid Point Value against observed rainfall, uncertainty in model prediction is probabilistically taken into account, and it is then applied to the next GPV issuance for generating ensemble rainfalls. The ensemble rainfalls drive the coupled land-surface- and distributed-hydrological model to derive the ensemble flood forecast. Together with dam status information taken into account, our integrated system estimates the most desirable priori dam release through the shuffled complex evolution algorithm. The strength of the optimization system is further magnified by the online link to the Data Integration and Analysis System, a Japanese national project for collecting, integrating and analyzing massive amount of global scale observation data, meaning that the present system is applicable worldwide. We demonstrate the integrated system with observed extreme events in Angat Watershed, the Philippines, and Upper Tone River basin, Japan. The results show promising performance for operational use of the system to support river and dam managers' decision-making.

  20. Risk Perception Analysis Related To Existing Dams In Italy

    NASA Astrophysics Data System (ADS)

    Solimene, Pellegrino

    2013-04-01

    In the first part of this work, the progress of Italian National Rules about dams design, construction and operation are presented to highlight the strong connection existing between the promulgation of new decrees, as a consequence of a dam accidents, and the necessity to prevent further loss of lives and goods downstream. Following the Gleno Dam failure (1923), a special Ministerial Committee wrote out the first Regulations and made the proposal to establish, within the High Council of Public Works, a special department that become soon the "Dam Service", with the tasks of control and supervision about construction and operation phases of the dams and their reservoirs. A different definition of tasks and the structure of Dam Service were provided in accordance with law n° 183/1989, which transferred all the technical services to the Office of the Prime Minister; the aim was to join the Dam Office with the Department for National Technical Services, with the objective of increasing the knowledge of the territory and promoting the study on flood propagation downstream in case of operations on bottom outlet or hypothetical dam-break. In fact, population living downstream is not ready to accept any amount of risk because has not a good knowledge of the efforts of experts involved in dam safety, both from the operators and from the safety Authority. So it's important to optimize all the activities usually performed in a dam safety program and improve the emergency planning as a response to people's primary needs and feeling about safety from Civil Protection Authority. In the second part of the work, a definition of risk is provided as the relationship existing between probability of occurrence and loss, setting out the range within to plan for prevention (risk mitigation), thanks to the qualitative assessment of the minimum safety level that is suited to assign funds to plan for Civil Protection (loss mitigation). The basic meaning of the reliability of a zoned earthfill dam is illustrated by defining the risk analysis during its construction and operation. A qualitative "Event Tree Analysis" makes clear with an example the probability of occurrence of the events triggered by an earthquake, and leads to a classification of the damage level. Finally, a System Dynamics (SD) approach is presented to investigate possibilities of a preventive planning in relationship to the risk, so that it's possible to establish shared procedures to achieve the correct management in any crisis phase. As a qualitative result of a SD application, figure 1 presents a flow-chart about a case study on the same dam so to illustrate the emergency planning in a step by step procedure according to the Regulations.

  1. Ant Colony Optimization Analysis on Overall Stability of High Arch Dam Basis of Field Monitoring

    PubMed Central

    Liu, Xiaoli; Chen, Hong-Xin; Kim, Jinxie

    2014-01-01

    A dam ant colony optimization (D-ACO) analysis of the overall stability of high arch dams on complicated foundations is presented in this paper. A modified ant colony optimization (ACO) model is proposed for obtaining dam concrete and rock mechanical parameters. A typical dam parameter feedback problem is proposed for nonlinear back-analysis numerical model based on field monitoring deformation and ACO. The basic principle of the proposed model is the establishment of the objective function of optimizing real concrete and rock mechanical parameter. The feedback analysis is then implemented with a modified ant colony algorithm. The algorithm performance is satisfactory, and the accuracy is verified. The m groups of feedback parameters, used to run a nonlinear FEM code, and the displacement and stress distribution are discussed. A feedback analysis of the deformation of the Lijiaxia arch dam and based on the modified ant colony optimization method is also conducted. By considering various material parameters obtained using different analysis methods, comparative analyses were conducted on dam displacements, stress distribution characteristics, and overall dam stability. The comparison results show that the proposal model can effectively solve for feedback multiple parameters of dam concrete and rock material and basically satisfy assessment requirements for geotechnical structural engineering discipline. PMID:25025089

  2. Many-Objective Reservoir Policy Identification and Refinement to Reduce Institutional Myopia in Water Management

    NASA Astrophysics Data System (ADS)

    Giuliani, M.; Herman, J. D.; Castelletti, A.; Reed, P. M.

    2013-12-01

    Institutional inertia strongly limits our ability to adapt water reservoir operations to better manage growing water demands as well as their associated uncertainties in a changing climate. Although it has long been recognized that these systems are generally framed in heterogeneous socio-economic contexts involving a myriad of conflicting, non-commensurable operating objectives, our broader understanding of the multiobjective consequences of current operating rules as well as their vulnerability to hydroclimatic uncertainties is severely limited. This study proposes a decision analytic framework to overcome policy inertia and myopia in complex river basin management contexts. The framework combines reservoir policy identification and many-objective optimization under uncertainty to characterize current operations and discover key tradeoffs between alternative policies for balancing evolving demands and system uncertainties. The approach is demonstrated on the Conowingo Dam, located within the Lower Susquehanna River, USA. The Lower Susquehanna River is an interstate water body that has been subject to intensive water management efforts due to the system's competing demands from urban water supply, atomic power plant cooling, hydropower production, and federally regulated environmental flows. Initially our proposed framework uses available streamflow observations to implicitly identify the Conowingo Dam's current but unknown operating policy. This baseline policy is identified by fitting radial basis functions to existing system dynamics. Our assumption in the baseline policy is that the dam operator is represented as a rational agent seeking to maximize primary operational objectives (i.e., guaranteeing the public water supply and maximizing the hydropower revenue). The quality of the identified baseline policy is evaluated by its ability to replicate historical release dynamics. Once identified, the historical baseline policy then provides a means of representing the decision preferences guiding current operations. Our results show that the estimated policy closely captures the dynamics of current releases and flows for the Lower Susquehanna. After identifying the historical baseline policy, our proposed decision analytic framework then combines evolutionary many-objective optimization with visual analytics to discover improved operating policies. Our Lower Susquehanna results confirm that the system's current history-based operations are negatively biased to overestimate the reliability of the reservoir's multi-sector services. Moreover, our proposed framework has successfully identified alternative reservoir policies that are more robust to hydroclimatic uncertainties while being capable of better addressing the tradeoffs across the Conowingo Dam's multi-sector services.

  3. Quantifying Factors That Impact Riverbed Dynamic Permeability at a Riverbank Filtration Facility

    NASA Astrophysics Data System (ADS)

    Ulrich, C.; Hubbard, S. S.; Florsheim, J. L.; Rosenberry, D. O.; Borglin, S. E.; Zhang, Y.; Seymour, D.; Trotta, M.

    2012-12-01

    Previous modeling studies of the Wohler riverbank filtration system on the Russian River, California suggested that riverbed and aquifer permeability both influence the development of a pumping-induced unsaturated zone below the riverbed, which affects water produced through large radial water-supply collector wells that extend beneath and adjacent to the river. In particular, previous work suggests that riverbed permeability is influenced by interaction between pumping and river stage that is controlled by a downstream temporary inflatable dam during the summer low flow period. We hypothesize that raising the dam may instead lead to deposition of fine-grained sediment and/or accumulation of biota, both of which decrease riverbed permeability in the vicinity of the collector wells. To test this hypothesis, we are monitoring streambed permeability and seepage as a function of river stage and dam operation. We are using multiple methods to monitor the hydrological, sedimentological and geomorphic dynamics, including: seepage meters, sediment traps, cryogenic coring, ground penetrating radar, electrical resistance tomography, riverbed topography, piezometers, and thermistors. Here we discuss the use of this novel suite of methods to quantify dynamic riverbed permeability, how it relates to dam operation, and determine the key controls on permeability (i.e., biotic or abiotic). These results are expected to improve the overall understanding of riverbed permeability dynamics associated with Riverbank filtration. The results are also expected to be transferable to the project sponsors, the Sonoma County Water Agency, toward the development of an optimal pumping and dam operation schedule.

  4. Acidity control in the North Branch Potomac

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sheer, D.P.; Harris, D.C.

    1982-11-01

    The North Branch of the Potomac River is polluted by acid drainage from abandoned coal mines. Recent studies have shown an improvement in water quality since the construction of a large dam near Bloomington, MD; the reservoir formed by the dam intercepts and dilutes slugs of acid. In addition, secondary treatment of pulp and paper industry waste waters at Westernport, MD, results in the production of bicarbonate which also helps to neutralise the acid. The authors propose a method for determining the optimal operation of the reservoir to control acidity.

  5. Mitigating Dam Impacts Using Environmental Flow Releases

    NASA Astrophysics Data System (ADS)

    Richter, B. D.

    2017-12-01

    One of the most ecologically disruptive impacts of dams is their alteration of natural river flow variability. Opportunities exist for modifying the operations of existing dams to recover many of the environmental and social benefits of healthy ecosystems that have been compromised by present modes of dam operation. The potential benefits of dam "re-operation" include recovery of fish, shellfish, and other wildlife populations valued both commercially and recreationally, including estuarine species; reactivation of the flood storage and water purification benefits that occur when floods are allowed to flow into floodplain forests and wetlands; regaining some semblance of the naturally dynamic balance between river erosion and sedimentation that shapes physical habitat complexity, and arresting problems associated with geomorphic imbalances; cultural and spiritual uses of rivers; and many other socially valued products and services. Assessing the potential benefits of dam re-operation begins by characterizing the dam's effects on the river flow regime, and formulating hypotheses about the ecological and social benefits that might be restored by releasing water from the dam in a manner that more closely resembles natural flow patterns. These hypotheses can be tested by implementing a re-operation plan, tracking the response of the ecosystem, and continually refining dam operations through adaptive management. This presentation will highlight a number of land and water management strategies useful in implementing a dam re-operation plan, with reference to a variety of management contexts ranging from individual dams to cascades of dams along a river to regional energy grids. Because many of the suggested strategies for dam re-operation are predicated on changes in the end-use of the water, such as reductions in urban or agricultural water use during droughts, a systemic perspective of entire water management systems will be required to attain the fullest possible benefits of dam re-operations.

  6. Improved algorithms in the CE-QUAL-W2 water-quality model for blending dam releases to meet downstream water-temperature targets

    USGS Publications Warehouse

    Rounds, Stewart A.; Buccola, Norman L.

    2015-01-01

    Water-quality models allow water resource professionals to examine conditions under an almost unlimited variety of potential future scenarios. The two-dimensional (longitudinal, vertical) water-quality model CE-QUAL-W2, version 3.7, was enhanced and augmented with new features to help dam operators and managers explore and optimize potential solutions for temperature management downstream of thermally stratified reservoirs. Such temperature management often is accomplished by blending releases from multiple dam outlets that access water of different temperatures at different depths. The modified blending algorithm in version 3.7 of CE-QUAL-W2 allows the user to specify a time-series of target release temperatures, designate from 2 to 10 floating or fixed-elevation outlets for blending, impose minimum and maximum head and flow constraints for any blended outlet, and set priority designations for each outlet that allow the model to choose which outlets to use and how to balance releases among them. The modified model was tested with a variety of examples and against a previously calibrated model of Detroit Lake on the North Santiam River in northwestern Oregon, and the results compared well. These updates to the blending algorithms will allow more complicated dam-operation scenarios to be evaluated somewhat automatically with the model, with decreased need for multiple model runs or preprocessing of model inputs to fully characterize the operational constraints.

  7. Impact of extreme precipitation events in the Miño-Sil river basin

    NASA Astrophysics Data System (ADS)

    Fernández-González, Manuel; Añel, Juan Antonio; de la Torre, Laura

    2015-04-01

    We herein research the impact of extreme rainfall events in the Miño-Sil basin, a heavily dammed basin located in the northwestern Iberian Peninsula. Extreme rainfall events are very important in this basin because with 106 dams it is the most dammed in Spain. These dams are almost exclusively used for hydropower generation, the installed generating capacity reaches more than 2700 MW and represents almost 9% of the total installed electrical generation capacity of the Iberian Peninsula, therefore with a potential impact on the energy market. We research the extreme events of rainfall an their return periods trying to reproduce the past extreme events of rainfall and their time periods to prove the proper functioning of the adapted model, so we can forecast future extreme events of rainfall in the basin. This research tries to optimize the storage of dams and adapt the management to problems as climate change. The results obtained are very relevant for hydroelectric generation because the operation of hydropower system depends primarily on the availability of storaged water.

  8. Seasonal forecasting for water resource management: the example of CNR Genissiat dam on the Rhone River in France

    NASA Astrophysics Data System (ADS)

    Dommanget, Etienne; Bellier, Joseph; Ben Daoud, Aurélien; Graff, Benjamin

    2014-05-01

    Compagnie Nationale du Rhône (CNR) has been granted the concession to operate the Rhone River from the Swiss border to the Mediterranean Sea since 1933 and carries out three interdependent missions: navigation, irrigation and hydropower production. Nowadays, CNR generates one quarter of France's hydropower electricity. The convergence of public and private interests around optimizing the management of water resources throughout the French Rhone valley led CNR to develop hydrological models dedicated to discharge seasonal forecasting. Indeed, seasonal forecasting is a major issue for CNR and water resource management, in order to optimize long-term investments of the produced electricity, plan dam maintenance operations and anticipate low water period. Seasonal forecasting models have been developed on the Genissiat dam. With an installed capacity of 420MW, Genissiat dam is the first of the 19 CNR's hydropower plants. Discharge forecasting at Genissiat dam is strategic since its inflows contributes to 20% of the total Rhone average discharge and consequently to 40% of the total Rhone hydropower production. Forecasts are based on hydrological statistical models. Discharge on the main Rhone River tributaries upstream Genissiat dam are forecasted from 1 to 6 months ahead thanks to multiple linear regressions. Inputs data of these regressions are identified depending on river hydrological regimes and periods of the year. For the melting season, from spring to summer, snow water equivalent (SWE) data are of major importance. SWE data are calculated from Crocus model (Météo France) and SLF's model (Switzerland). CNR hydro-meteorological forecasters assessed meteorological trends regarding precipitations for the next coming months. These trends are used to generate stochastically precipitation scenarios in order to complement regression data set. This probabilistic approach build a decision-making supports for CNR's water resource management team and provides them with seasonal forecasts and their confidence interval. After a presentation of CNR methodology, results for the years 2011 and 2013 will illustrate CNR's seasonal forecasting models ability. These years are of particular interest regarding water resource management seeing that they are, respectively, unusually dry and snowy. Model performances will be assessed in comparison with historical climatology thanks to CRPS skill score.

  9. Efficient ecologic and economic operational rules for dammed systems by means of nondominated sorting genetic algorithm II

    NASA Astrophysics Data System (ADS)

    Niayifar, A.; Perona, P.

    2015-12-01

    River impoundment by dams is known to strongly affect the natural flow regime and in turn the river attributes and the related ecosystem biodiversity. Making hydropower sustainable implies to seek for innovative operational policies able to generate dynamic environmental flows while maintaining economic efficiency. For dammed systems, we build the ecological and economical efficiency plot for non-proportional flow redistribution operational rules compared to minimal flow operational. As for the case of small hydropower plants (e.g., see the companion paper by Gorla et al., this session), we use a four parameters Fermi-Dirac statistical distribution to mathematically formulate non-proportional redistribution rules. These rules allocate a fraction of water to the riverine environment depending on current reservoir inflows and storage. Riverine ecological benefits associated to dynamic environmental flows are computed by integrating the Weighted Usable Area (WUA) for fishes with Richter's hydrological indicators. Then, we apply nondominated sorting genetic algorithm II (NSGA-II) to an ensemble of non-proportional and minimal flow redistribution rules in order to generate the Pareto frontier showing the system performances in the ecologic and economic space. This fast and elitist multiobjective optimization method is eventually applied to a case study. It is found that non-proportional dynamic flow releases ensure maximal power production on the one hand, while conciliating ecological sustainability on the other hand. Much of the improvement in the environmental indicator is seen to arise from a better use of the reservoir storage dynamics, which allows to capture, and laminate flood events while recovering part of them for energy production. In conclusion, adopting such new operational policies would unravel a spectrum of globally-efficient performances of the dammed system when compared with those resulting from policies based on constant minimum flow releases.

  10. Designing multi-reservoir system designs via efficient water-energy-food nexus trade-offs - Selecting new hydropower dams for the Blue Nile and Nepal's Koshi Basin

    NASA Astrophysics Data System (ADS)

    Harou, J. J.; Hurford, A.; Geressu, R. T.

    2015-12-01

    Many of the world's multi-reservoir water resource systems are being considered for further development of hydropower and irrigation aiming to meet economic, political and ecological goals. Complex river basins serve many needs so how should the different proposed groupings of reservoirs and their operations be evaluated? How should uncertainty about future supply and demand conditions be factored in? What reservoir designs can meet multiple goals and perform robustly in a context of global change? We propose an optimized multi-criteria screening approach to identify best performing designs, i.e., the selection, size and operating rules of new reservoirs within multi-reservoir systems in a context of deeply uncertain change. Reservoir release operating rules and storage sizes are optimized concurrently for each separate infrastructure design under consideration across many scenarios representing plausible future conditions. Outputs reveal system trade-offs using multi-dimensional scatter plots where each point represents an approximately Pareto-optimal design. The method is applied to proposed Blue Nile River reservoirs in Ethiopia, where trade-offs between capital costs, total and firm energy output, aggregate storage and downstream irrigation and energy provision for the best performing designs are evaluated. The impact of filling period for large reservoirs is considered in a context of hydrological uncertainty. The approach is also applied to the Koshi basin in Nepal where combinations of hydropower storage and run-of-river dams are being considered for investment. We show searching for investment portfolios that meet multiple objectives provides stakeholders with a rich view on the trade-offs inherent in the nexus and how different investment bundles perform differently under plausible futures. Both case-studies show how the proposed approach helps explore and understand the implications of investing in new dams in a global change context.

  11. Preliminary Optimization for Spring-Run Chinook Salmon Environmental Flows in Lassen Foothill Watersheds

    NASA Astrophysics Data System (ADS)

    Ta, J.; Kelsey, R.; Howard, J.; Hall, M.; Lund, J. R.; Viers, J. H.

    2014-12-01

    Stream flow controls physical and ecological processes in rivers that support freshwater ecosystems and biodiversity vital for services that humans depend on. This master variable has been impaired by human activities like dam operations, water diversions, and flood control infrastructure. Furthermore, increasing water scarcity due to rising water demands and droughts has further stressed these systems, calling for the need to find better ways to identify and allocate environmental flows. In this study, a linear optimization model was developed for environmental flows in river systems that have minimal or no regulation from dam operations, but still exhibit altered flow regimes due to surface water diversions and groundwater abstraction. Flow regime requirements for California Central Valley spring-run Chinook salmon (Oncorhynchus tshawytscha) life history were used as a test case to examine how alterations to the timing and magnitude of water diversions meet environmental flow objectives while minimizing impact to local water supply. The model was then applied to Mill Creek, a tributary of the Sacramento River, in northern California, and its altered flow regime that currently impacts adult spring-run Chinook spawning and migration. The resulting optimized water diversion schedule can be used to inform water management decisions that aim to maximize benefit for the environment while meeting local water demands.

  12. Simulating potential structural and operational changes for Detroit Dam on the North Santiam River, Oregon, for downstream temperature management

    USGS Publications Warehouse

    Buccola, Norman L.; Rounds, Stewart A.; Sullivan, Annett B.; Risley, John C.

    2012-01-01

    Detroit Dam was constructed in 1953 on the North Santiam River in western Oregon and resulted in the formation of Detroit Lake. With a full-pool storage volume of 455,100 acre-feet and a dam height of 463 feet, Detroit Lake is one of the largest and most important reservoirs in the Willamette River basin in terms of power generation, recreation, and water storage and releases. The U.S. Army Corps of Engineers operates Detroit Dam as part of a system of 13 reservoirs in the Willamette Project to meet multiple goals, which include flood-damage protection, power generation, downstream navigation, recreation, and irrigation. A distinct cycle in water temperature occurs in Detroit Lake as spring and summer heating through solar radiation creates a warm layer of water near the surface and isolates cold water below. Controlling the temperature of releases from Detroit Dam, therefore, is highly dependent on the location, characteristics, and usage of the dam's outlet structures. Prior to operational changes in 2007, Detroit Dam had a well-documented effect on downstream water temperature that was problematic for endangered salmonid fish species, releasing water that was too cold in midsummer and too warm in autumn. This unnatural seasonal temperature pattern caused problems in the timing of fish migration, spawning, and emergence. In this study, an existing calibrated 2-dimensional hydrodynamic water-quality model [CE-QUAL-W2] of Detroit Lake was used to determine how changes in dam operation or changes to the structural release points of Detroit Dam might affect downstream water temperatures under a range of historical hydrologic and meteorological conditions. The results from a subset of the Detroit Lake model scenarios then were used as forcing conditions for downstream CE-QUAL-W2 models of Big Cliff Reservoir (the small reregulating reservoir just downstream of Detroit Dam) and the North Santiam and Santiam Rivers. Many combinations of environmental, operational, and structural options were explored with the model scenarios. Multiple downstream temperature targets were used along with three sets of environmental forcing conditions representing cool/wet, normal, and hot/dry conditions. Five structural options at Detroit Dam were modeled, including the use of existing outlets, one hypothetical variable-elevation outlet such as a sliding gate, a hypothetical combination of a floating outlet and a fixed-elevation outlet, and a hypothetical combination of a floating outlet and a sliding gate. Finally, 14 sets of operational guidelines for Detroit Dam were explored to gain an understanding of the effects of imposing different downstream minimum streamflows, imposing minimum outflow rules to specific outlets, and managing the level of the lake with different timelines through the year. Selected subsets of these combinations of operational and structural scenarios were run through the downstream models of Big Cliff Reservoir and the North Santiam and Santiam Rivers to explore how hypothetical changes at Detroit Dam might provide improved temperatures for endangered salmonids downstream of the Detroit-Big Cliff Dam complex. Conclusions that can be drawn from these model scenarios include: *The water-temperature targets set by the U.S. Army Corps of Engineers for releases from Detroit Dam can be met through a combination of new dam outlets or a delayed drawdown of the lake in autumn. *Spring and summer dam operations greatly affect the available release temperatures and operational flexibility later in the autumn. Releasing warm water during midsummer tends to keep more cool water available for release in autumn. *The ability to meet downstream temperature targets during spring depends on the characteristics of the available outlets. Under existing conditions, although warm water sometimes is present at the lake surface in spring and early summer, such water may not be available for release if the lake level is either well below or well above the spillway crest. *Managing lake releases to meet downstream temperature targets depends on having outlet structures that can access both (warm) lake surface water and (cold) deeper lake water throughout the year. The existing outlets at Detroit Dam do not allow near-surface waters to be released during times when the lake surface level is below the spillway (spring and autumn). *Using the existing outlets at Detroit Dam, lake level management is important to the water temperature of releases because it controls the availability and depth of water at the spillway. When lake level is lowered below the spillway crest in late summer, the loss of access to warm water at the lake surface can result in abrupt changes to release temperatures. *Because the power-generation intakes (penstocks) are 166 feet below the full-pool lake level, imposing minimum power production requirements at Detroit Dam limits the amount of warm surface water that can be expelled from the lake in midsummer, thereby postponing and amplifying warm outflows from Detroit Lake into the autumn spawning season. *Likewise, imposing minimum power production requirements at Detroit Dam in autumn can limit the amount of cool hypolimnetic water that is released from the lake, thereby limiting cool outflows from Detroit Lake during the autumn spawning season. *Model simulations indicate that a delayed drawdown of Detroit Lake in autumn would result in better control over release temperatures in the immediate downstream vicinity of Big Cliff Dam, but the reduced outflows necessary to retain more water in the lake in late summer are more susceptible to rapid heating downstream. *Compared to the existing outlets at Detroit Dam, floating or sliding-gate outlet structures can provide greater control over release temperatures because they provide better access to warm water at the lake surface and cooler water at depth. These conclusions can be grouped into several common themes. First, optimal and flexible management and achievement of downstream temperature goals requires that releases of warm water near the surface of the lake and cold water below the thermocline are both possible with the available dam outlets during spring, summer, and autumn. This constraint can be met to some extent with existing outlets, but only if access to the spillway is extended into autumn by keeping the lake level higher than called for by the current rule curve (the typical target water-surface elevation throughout the year). If new outlets are considered, a variable-elevation outlet such as a sliding gate structure, or a floating outlet in combination with a fixed-elevation outlet at sufficient depth to access cold water, is likely to work well in terms of accessing a range of water temperatures and achieving downstream temperature targets. Furthermore, model results indicate that it is important to release warm water from near the lake surface during midsummer. If not released downstream, the warm water will build up at the top of the lake as a result of solar energy inputs and the thermocline will deepen, potentially causing warm water to reach the depth of deeper fixed-elevation outlets in autumn, particularly when the lake level is drawn down to make room for flood storage. Delaying the drawdown in autumn can help to keep the thermocline above such outlets and preserve access to cold water. Although it is important to generate hydropower at Detroit Dam, minimum power-production requirements limit the ability of dam operators to meet downstream temperature targets with existing outlet structures. The location of the power penstocks below the thermocline in spring and most of summer causes the release of more cool water during summer than is optimal. Reducing the power-production constraint allows the temperature target to be met more frequently, but at the cost of less power generation. Finally, running the Detroit Dam, Big Cliff Dam, and North Santiam and Santiam River models in series allows dam operators to evaluate how different operational strategies or combinations of new dam outlets might affect downstream temperatures for many miles of critical endangered salmonid habitat. Temperatures can change quickly in these downstream reaches as the river exchanges heat with its surroundings, and heating or cooling of 6 degrees Celsius is not unusual in the 40–50 miles downstream of Big Cliff Dam. The results published in this report supersede preliminary results published in U.S. Geological Survey Open-File Report 2011-1268 (Buccola and Rounds, 2011). Those preliminary results are still valid, but the results in this report are more current and comprehensive.

  13. Optimizing Reservoir Operation to Adapt to the Climate Change

    NASA Astrophysics Data System (ADS)

    Madadgar, S.; Jung, I.; Moradkhani, H.

    2010-12-01

    Climate change and upcoming variation in flood timing necessitates the adaptation of current rule curves developed for operation of water reservoirs as to reduce the potential damage from either flood or draught events. This study attempts to optimize the current rule curves of Cougar Dam on McKenzie River in Oregon addressing some possible climate conditions in 21th century. The objective is to minimize the failure of operation to meet either designated demands or flood limit at a downstream checkpoint. A simulation/optimization model including the standard operation policy and a global optimization method, tunes the current rule curve upon 8 GCMs and 2 greenhouse gases emission scenarios. The Precipitation Runoff Modeling System (PRMS) is used as the hydrology model to project the streamflow for the period of 2000-2100 using downscaled precipitation and temperature forcing from 8 GCMs and two emission scenarios. An ensemble of rule curves, each associated with an individual scenario, is obtained by optimizing the reservoir operation. The simulation of reservoir operation, for all the scenarios and the expected value of the ensemble, is conducted and performance assessment using statistical indices including reliability, resilience, vulnerability and sustainability is made.

  14. Accuracy Analysis of a Dam Model from Drone Surveys

    PubMed Central

    Buffi, Giulia; Venturi, Sara

    2017-01-01

    This paper investigates the accuracy of models obtained by drone surveys. To this end, this work analyzes how the placement of ground control points (GCPs) used to georeference the dense point cloud of a dam affects the resulting three-dimensional (3D) model. Images of a double arch masonry dam upstream face are acquired from drone survey and used to build the 3D model of the dam for vulnerability analysis purposes. However, there still remained the issue of understanding the real impact of a correct GCPs location choice to properly georeference the images and thus, the model. To this end, a high number of GCPs configurations were investigated, building a series of dense point clouds. The accuracy of these resulting dense clouds was estimated comparing the coordinates of check points extracted from the model and their true coordinates measured via traditional topography. The paper aims at providing information about the optimal choice of GCPs placement not only for dams but also for all surveys of high-rise structures. The knowledge a priori of the effect of the GCPs number and location on the model accuracy can increase survey reliability and accuracy and speed up the survey set-up operations. PMID:28771185

  15. Accuracy Analysis of a Dam Model from Drone Surveys.

    PubMed

    Ridolfi, Elena; Buffi, Giulia; Venturi, Sara; Manciola, Piergiorgio

    2017-08-03

    This paper investigates the accuracy of models obtained by drone surveys. To this end, this work analyzes how the placement of ground control points (GCPs) used to georeference the dense point cloud of a dam affects the resulting three-dimensional (3D) model. Images of a double arch masonry dam upstream face are acquired from drone survey and used to build the 3D model of the dam for vulnerability analysis purposes. However, there still remained the issue of understanding the real impact of a correct GCPs location choice to properly georeference the images and thus, the model. To this end, a high number of GCPs configurations were investigated, building a series of dense point clouds. The accuracy of these resulting dense clouds was estimated comparing the coordinates of check points extracted from the model and their true coordinates measured via traditional topography. The paper aims at providing information about the optimal choice of GCPs placement not only for dams but also for all surveys of high-rise structures. The knowledge a priori of the effect of the GCPs number and location on the model accuracy can increase survey reliability and accuracy and speed up the survey set-up operations.

  16. Sediment depositions upstream of open check dams: new elements from small scale models

    NASA Astrophysics Data System (ADS)

    Piton, Guillaume; Le Guern, Jules; Carbonari, Costanza; Recking, Alain

    2015-04-01

    Torrent hazard mitigation remains a big issue in mountainous regions. In steep slope streams and especially in their fan part, torrential floods mainly result from abrupt and massive sediment deposits. To curtail such phenomenon, soil conservation measures as well as torrent control works have been undertaken for decades. Since the 1950s, open check dams complete other structural and non-structural measures in watershed scale mitigation plans1. They are often built to trap sediments near the fan apexes. The development of earthmoving machinery after the WWII facilitated the dredging operations of open check dams. Hundreds of these structures have thus been built for 60 years. Their design evolved with the improving comprehension of torrential hydraulics and sediment transport; however this kind of structure has a general tendency to trap most of the sediments supplied by the headwaters. Secondary effects as channel incision downstream of the traps often followed an open check dam creation. This sediment starvation trend tends to propagate to the main valley rivers and to disrupt past geomorphic equilibriums. Taking it into account and to diminish useless dredging operation, a better selectivity of sediment trapping must be sought in open check dams, i.e. optimal open check dams would trap sediments during dangerous floods and flush them during normal small floods. An accurate description of the hydraulic and deposition processes that occur in sediment traps is needed to optimize existing structures and to design best-adjusted new structures. A literature review2 showed that if design criteria exist for the structure itself, little information is available on the dynamic of the sediment depositions upstream of open check dams, i.e. what are the geomorphic patterns that occur during the deposition?, what are the relevant friction laws and sediment transport formula that better describe massive depositions in sediment traps?, what are the range of Froude and Shields numbers that the flows tend to adopt? New small scale model experiments have been undertaken focusing on depositions processes and their related hydraulics. Accurate photogrammetric measurements allowed us to better describe the deposition processes3. Large Scale Particle Image Velocimetry (LS-PIV) was performed to determine surface velocity fields in highly active channels with low grain submersion4. We will present preliminary results of our experiments showing the new elements we observed in massive deposit dynamics. REFERENCES 1.Armanini, A., Dellagiacoma, F. & Ferrari, L. From the check dam to the development of functional check dams. Fluvial Hydraulics of Mountain Regions 37, 331-344 (1991). 2.Piton, G. & Recking, A. Design of sediment traps with open check dams: a review, part I: hydraulic and deposition processes. (Accepted by the) Journal of Hydraulic Engineering 1-23 (2015). 3.Le Guern, J. Ms Thesis: Modélisation physique des plages de depot : analyse de la dynamique de remplissage.(2014) . 4.Carbonari, C. Ms Thesis: Small scale experiments of deposition processes occuring in sediment traps, LS-PIV measurments and geomorphological descriptions. (in preparation).

  17. Multi-objective optimization of an arch dam shape under static loads using an evolutionary game method

    NASA Astrophysics Data System (ADS)

    Meng, Rui; Cheong, Kang Hao; Bao, Wei; Wong, Kelvin Kian Loong; Wang, Lu; Xie, Neng-gang

    2018-06-01

    This article attempts to evaluate the safety and economic performance of an arch dam under the action of static loads. The geometric description of a crown cantilever section and the horizontal arch ring is presented. A three-objective optimization model of arch dam shape is established based on the arch dam volume, maximum principal tensile stress and total strain energy. The evolutionary game method is then applied to obtain the optimal solution. In the evolutionary game technique, a novel and more efficient exploration method of the game players' strategy space, named the 'sorting partition method under the threshold limit', is presented, with the game profit functions constructed according to both competitive and cooperative behaviour. By way of example, three optimization goals have all shown improvements over the initial solutions. In particular, the evolutionary game method has potentially faster convergence. This demonstrates the preliminary proof of principle of the evolutionary game method.

  18. Assessing juvenile native fish demographic responses to a steady flow experiment in a large regulated river

    USGS Publications Warehouse

    Finch, Colton G.; Pine, William E.; Yackulic, Charles B.; Dodrill, Michael J.; Yard, Michael D.; Gerig, Brandon S.; Coggins,, Lewis G.; Korman, Josh

    2016-01-01

    The Colorado River below Glen Canyon Dam, Arizona, is part of an adaptive management programme which optimizes dam operations to improve various resources in the downstream ecosystem within Grand Canyon. Understanding how populations of federally endangered humpback chub Gila cypha respond to these dam operations is a high priority. Here, we test hypotheses concerning temporal variation in juvenile humpback chub apparent survival rates and abundance by comparing estimates between hydropeaking and steady discharge regimes over a 3-year period (July 2009–July 2012). The most supported model ignored flow type (steady vs hydropeaking) and estimated a declining trend in daily apparent survival rate across years (99.90%, 99.79% and 99.67% for 2009, 2010 and 2011, respectively). Corresponding abundance of juvenile humpback chub increased temporally; open population model estimates ranged from 615 to 2802 individuals/km, and closed model estimates ranged from 94 to 1515 individuals/km. These changes in apparent survival and abundance may reflect broader trends, or simply represent inter-annual variation. Important findings include (i) juvenile humpback chub are currently surviving and recruiting in the mainstem Colorado River with increasing abundance; (ii) apparent survival does not benefit from steady fall discharges from Glen Canyon Dam; and (iii) direct assessment of demographic parameters for juvenile endangered fish are possible and can rapidly inform management actions in regulated rivers.

  19. A national perspective on paleoclimate streamflow and water storage infrastructure in the conterminous United States

    NASA Astrophysics Data System (ADS)

    Ho, Michelle; Lall, Upmanu; Sun, Xun; Cook, Edward

    2017-04-01

    Large-scale water storage infrastructure in the Conterminous United States (CONUS) provides a means of regulating the temporal variability in water supply with storage capacities ranging from seasonal storage in the wetter east to multi-annual and decadal-scale storage in the drier west. Regional differences in water availability across the CONUS provides opportunities for optimizing water dependent economic activities, such as food and energy production, through storage and transportation. However, the ability to sufficiently regulate water supplies into the future is compromised by inadequate monitoring of non-federally-owned dams that make up around 97% of all dams. Furthermore, many of these dams are reaching or have exceeded their economic design life. Understanding the role of dams in the current and future landscape of water requirements in the CONUS is needed to prioritize dam safety remediation or identify where redundant dams may be removed. A national water assessment and planning process is needed for addressing water requirements, accounting for regional differences in water supply and demand, and the role of dams in such a landscape. Most dams in the CONUS were designed without knowledge of devastating floods and prolonged droughts detected in multi-centennial paleoclimate records, consideration of projected climate change, nor consideration of optimal operation across large-scale regions. As a step towards informing water supply across the CONUS we present a paleoclimate reconstruction of annual streamflow across the CONUS over the past 555 years using a spatially and temporally complete paleoclimate record of summer drought across the CONUS targeting a set of US Geological Survey streamflow sites. The spatial and temporal structures of national streamflow variability are analyzed using hierarchical clustering, principal component analysis, and wavelet analyses. The reconstructions show signals of contemporary droughts such as the Dust Bowl (1930s) and 1950s droughts. Decadal-scale variability was detected in the late 1900s in the western US, however, similar modes of temporal variability were rarely present prior to the 1950s. The 20th century featured longer wet spells and shorter dry spells compared with the preceding 450 years. Streamflow in the Pacific Northwest and Northeast are negatively correlated with the central US suggesting the potential to mitigate some drought impacts by balancing economic activities and insurance pools across these regions during major droughts. The converging issues of a slowly growing US population, evolving demands for food, energy, and water, aging dams, and reduced water storage capacity through decommissioning and sedimentation highlights the pressing need for a national water assessment and a subsequent national water plan. There are many factors that need to be understood in order to appropriately assess dam and reservoir requirements across the CONUS and to improve water use and flood protection efficiency. In addition to historical and paleoclimate-informed surface water supply, factors requiring consideration in planning for future dam and reservoir infrastructure include: -the role of conjunctive surface and groundwater storage and use; -basin-scale operational strategies to balance sectoral water demand; -projections of surface water supply; -projections of regional water demands; -impacts of water conservation; and -the influence of water policy and financial instruments.

  20. Emergency Planning for Dams: Bibliography and Abstracts of Selected Publications,

    DTIC Science & Technology

    1982-01-01

    Government Operations. Teton Dam Disaster: Hearings Before a Subcom- mittee of the Committee on Government Operations, House of Representatives. U.S...Government Printing Office. Washington, DC. 1976. Committee on Government Operations. Teton Dam Disaster: Thirtieth Response. U.S. Government Printing Office...Design Earthquakes. * Teton Dam Failure. *Summary of 1st Session on Evaluation OSummary of Session on Failure and of Seismic Stability. Near Failure

  1. Project Operations: Flood Control Operations and Maintenance Policies

    DTIC Science & Technology

    1996-10-30

    President and an internal review performed by the Corps task group shortly after failure of the Teton Dam , we have undertaken numerous actions to modify our...practice for design, construction and operation of Corps reservoir projects. One important item as a result of the Teton Dam failure and the review...1 Glossary 1-4 1-2 CHAPTER 2 - Dam Operations Management Purpose 2-1 2-1 Policy 2-2 2-1 Emergency Plan 2-3 2-1 Dam Safety Training 2-4 2-2

  2. Short-term Operation of Multi-purpose Reservoir using Model Predictive Control

    NASA Astrophysics Data System (ADS)

    Uysal, Gokcen; Schwanenberg, Dirk; Alvarado Montero, Rodolfo; Sensoy, Aynur; Arda Sorman, Ali

    2017-04-01

    Operation of water structures especially with conflicting water supply and flood mitigation objectives is under more stress attributed to growing water demand and changing hydro-climatic conditions. Model Predictive Control (MPC) based optimal control solutions has been successfully applied to different water resources applications. In this study, Feedback Control (FBC) and MPC get combined and an improved joint optimization-simulation operating scheme is proposed. Water supply and flood control objectives are fulfilled by incorporating the long term water supply objectives into a time-dependent variable guide curve policy whereas the extreme floods are attenuated by means of short-term optimization based on MPC. A final experiment is carried out to assess the lead time performance and reliability of forecasts in a hindcasting experiment with imperfect, perturbed forecasts. The framework is tested in Yuvacık Dam reservoir where the main water supply reservoir of Kocaeli City in the northwestern part of Turkey (the Marmara region) and it requires a challenging gate operation due to restricted downstream flow conditions.

  3. Dams, Hydrology and Risk in Future River Management

    NASA Astrophysics Data System (ADS)

    Wegner, D. L.

    2017-12-01

    Across America there are over 80,000 large to medium dams and globally the number is in excess of 800,000. Currently there are over 1,400 dams and diversion structures being planned or under construction globally. In addition to these documented dams there are thousands of small dams populating watersheds. Governments, agencies, native tribes, private owners and regulators all have a common interest in safe dams. Often dam safety is characterized as reducing structural risk while providing for maximum operational flexibility. In the 1970's there were a number of large and small dam failures in the United States. These failures prompted the federal government to issue voluntary dam safety guidelines. These guidelines were based on historic information incorporated into a risk assessment process to analyze, evaluate and manage risk with the goal to improve the quality of and support of dam management and safety decisions. We conclude that historic and new risks need to be integrated into dam management to insure adequate safety and operational flexibility. A recent assessment of the future role of dams in the United States premises that future costs such as maintenance or removal beyond the economic design life have not been factored into the long-term operations or relicensing of dams. The converging risks associated with aging water storage infrastructure, multiple dams within watersheds and uncertainty in demands policy revisions and an updated strategic approach to dam safety. Decisions regarding the future of dams in the United States may, in turn, influence regional water planning and management. Leaders in Congress and in the states need to implement a comprehensive national water assessment and a formal analysis of the role dams play in our water future. A research and national policy agenda is proposed to assess future impacts and the design, operation, and management of watersheds and dams.

  4. Optimal control of hydroelectric facilities

    NASA Astrophysics Data System (ADS)

    Zhao, Guangzhi

    This thesis considers a simple yet realistic model of pump-assisted hydroelectric facilities operating in a market with time-varying but deterministic power prices. Both deterministic and stochastic water inflows are considered. The fluid mechanical and engineering details of the facility are described by a model containing several parameters. We present a dynamic programming algorithm for optimizing either the total energy produced or the total cash generated by these plants. The algorithm allows us to give the optimal control strategy as a function of time and to see how this strategy, and the associated plant value, varies with water inflow and electricity price. We investigate various cases. For a single pumped storage facility experiencing deterministic power prices and water inflows, we investigate the varying behaviour for an oversimplified constant turbine- and pump-efficiency model with simple reservoir geometries. We then generalize this simple model to include more realistic turbine efficiencies, situations with more complicated reservoir geometry, and the introduction of dissipative switching costs between various control states. We find many results which reinforce our physical intuition about this complicated system as well as results which initially challenge, though later deepen, this intuition. One major lesson of this work is that the optimal control strategy does not differ much between two differing objectives of maximizing energy production and maximizing its cash value. We then turn our attention to the case of stochastic water inflows. We present a stochastic dynamic programming algorithm which can find an on-average optimal control in the face of this randomness. As the operator of a facility must be more cautious when inflows are random, the randomness destroys facility value. Following this insight we quantify exactly how much a perfect hydrological inflow forecast would be worth to a dam operator. In our final chapter we discuss the challenging problem of optimizing a sequence of two hydro dams sharing the same river system. The complexity of this problem is magnified and we just scratch its surface here. The thesis concludes with suggestions for future work in this fertile area. Keywords: dynamic programming, hydroelectric facility, optimization, optimal control, switching cost, turbine efficiency.

  5. Many-objective reservoir policy identification and refinement to reduce institutional myopia in water management

    NASA Astrophysics Data System (ADS)

    Giuliani, Matteo; Herman, Jonathan D.; Castelletti, Andrea; Reed, Patrick M.

    2014-05-01

    Current water reservoir operating policies are facing growing water demands as well as increasing uncertainties associated with a changing climate. However, policy inertia and myopia strongly limit the possibility of adapting current water reservoir operations to the undergoing change. Historical agreements and regulatory constraints limit the rate that reservoir operations are innovated and creates policy inertia, where water institutions are unlikely to change their current practices in absence of dramatic failures. Yet, no guarantee exists that historical management policies will not fail in coming years. In reference to policy myopia, although it has long been recognized that water reservoir systems are generally framed in heterogeneous socio-economic contexts involving a myriad of conflicting, non-commensurable operating objectives, the broader understanding of the multi-objective consequences of current operating rules as well as their vulnerability to hydroclimatic uncertainties is severely limited. This study proposes a decision analytic framework to overcome both policy inertia and myopia in complex river basin management contexts. The framework combines reservoir policy identification, many-objective optimization under uncertainty, and visual analytics to characterize current operations and discover key tradeoffs between alternative policies for balancing evolving demands and system uncertainties. The approach is demonstrated on the Conowingo Dam, located within the Lower Susquehanna River, USA. The Lower Susquehanna River is an interstate water body that has been subject to intensive water management efforts due to the system's competing demands from urban water supply, atomic power plant cooling, hydropower production, and federally regulated environmental flows. The proposed framework initially uses available streamflow observations to implicitly identify the current but unknown operating policy of Conowingo Dam. The quality of the identified baseline policy was validated by its ability to replicate historical release dynamics. Starting from this baseline policy, we then combine evolutionary many-objective optimization with visual analytics to discover new operating policies that better balance the tradeoffs within the Lower Susquehanna. Results confirm that the baseline operating policy, which only considers deterministic historical inflows, significantly overestimates the reliability of the reservoir's competing demands. The proposed framework removes this bias by successfully identifying alternative reservoir policies that are more robust to hydroclimatic uncertainties, while also better addressing the tradeoffs across the Conowingo Dam's multi-sector services.

  6. 78 FR 34258 - Safety Zone; Salvage Operations at Marseilles Dam; Illinois River

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-07

    ...-AA00 Safety Zone; Salvage Operations at Marseilles Dam; Illinois River AGENCY: Coast Guard, DHS. ACTION... Illinois River starting at Mile Marker 246.9 and extending 600 yards upstream of the Marseilles Dam to Mile... repair efforts at the Marseilles Dam. This safety zone is necessary to protect the general public...

  7. Development of an integrated hydrological modeling system for near-real-time multi-objective reservoir operation in large river basins

    NASA Astrophysics Data System (ADS)

    Wang, L.; Koike, T.

    2010-12-01

    The climate change-induced variability in hydrological cycles directly affects regional water resources management. For improved multiple multi-objective reservoir operation, an integrated modeling system has been developed by incorporating a global optimization system (SCE-UA) into a distributed biosphere hydrological model (WEB-DHM) coupled with the reservoir routing module. The reservoir storage change is estimated from the difference between the simulated inflows and outflows; while the reservoir water level can be defined from the updated reservoir storage by using the H-V curve. According to the reservoir water level, the new operation rule can be decided. For optimization: (1) WEB-DHM is calibrated for each dam’s inflows separately; (2) then the calibrated WEB-DHM is used to simulate inflows and outflows by assuming outflow proportional to inflow; and (3) the proportion coefficients are optimized with Shuffle Complex Evolution method (SCE-UA), to fulfill an objective function towards minimum flood risk at downstream and maximum reservoir water storage for future use. The GSMaP product offers hourly global precipitation maps in near real-time (about four hours after observation). Aiming at near real-time reservoir operation in large river basins, the integrated modeling system takes the inputs from both an operational global quantitative precipitation forecast (JMA-GPV; to achieve an optimal operation rule in the assumed lead time period) and the GSMaP product (to perform current operation with the obtained optimal rule, after correction by gauge rainfall). The newly-developed system was then applied to the Red River Basin, with an area of 160,000 km2, to test its performance for near real-time dam operation. In Vietnam, three reservoirs are located in the upstream of Hanoi city, with Hoa Binh the largest (69% of total volume). After calibration with the gauge rainfall, the inflows to three reservoirs are well simulated; the discharge and water level at Hanoi city are also well reproduced with the actual dam releases. With the corrected GSMaP rainfall (by using gauge rainfall), the inflows to reservoirs and the water level at Hanoi city can be also reasonably reproduced. The study aims at achieving an optimal operation rule in the lead time period (with the quantitative precipitation forecast) and then using it to perform current operation (with the corrected GSMaP rainfall). At Hanoi, there are relatively low flows in July, but high floods in August 2005. Results show that with the actual operation, dangerous water level in Hanoi was observed; while with the lead-time operation, the water level in Hanoi can be obviously cut down, and maximum water storage is also achieved for Hoa Binh reservoir at the end of flood season.

  8. 94. DAM TAINTER GATE OPERATING MACHINERY METHOD OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    94. DAM - TAINTER GATE OPERATING MACHINERY - METHOD OF ATTACHING LIFTING CHAINS TO DRUMS OF HOIST - LAKESIDE TYPE (ML-4&5-55/34-FS), February 1938 - Upper Mississippi River 9-Foot Channel, Lock & Dam No. 4, Alma, Buffalo County, WI

  9. Evaluation of the Biological Effects of the Northwest Power Conservation Council's Mainstem Amendment on the Fisheries Upstream and Downstream of Libby Dam, Montana, 2007-2008 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sylvester, Ryan; Stephens, Brian; Tohtz, Joel

    2009-04-03

    A new project began in 2005 to monitor the biological and physical effects of improved operations of Hungry Horse and Libby Dams, Montana, called for by the Northwest Power and Conservation Council (NPCC) Mainstem Amendment. This operating strategy was designed to benefit resident fish impacted by hydropower and flood control operations. Under the new operating guidelines, July through September reservoir drafts will be limited to 10 feet from full pool during the highest 80% of water supply years and 20 feet from full pool during the lowest 20% of water supply (drought) years. Limits were also established on how rapidlymore » discharge from the dams can be increased or decreased depending on the season. The NPCC also directed the federal agencies that operate Libby and Hungry Horse Dams to implement a new flood control strategy (VARQ) and directed Montana Fish, Wildlife & Parks to evaluate biological responses to this operating strategy. The Mainstem Amendment operating strategy has not been fully implemented at the Montana dams as of June 2008 but the strategy will be implemented in 2009. This report highlights the monitoring methods used to monitor the effects of the Mainstem Amendment operations on fishes, habitat, and aquatic invertebrates upstream and downstream of Libby Dam. We also present initial assessments of data and the effects of various operating strategies on physical and biological components of the systems upstream and downstream of Libby Dam. Annual electrofishing surveys in the Kootenai River and selected tributaries, along with gill net surveys in the reservoir, are being used to quantify the impacts of dam operations on fish populations upstream and downstream of Libby Dam. Scales and otoliths are being used to determine the age structure and growth of focal species. Annual population estimates and tagging experiments provide estimates of survival and growth in the mainstem Kootenai River and selected tributaries. Radio telemetry will be used to validate an existing Instream Flow Incremental Methodology (IFIM) model developed for the Kootenai River and will also be used to assess the effect of changes in discharge on fish movements and habitat use downstream of Libby Dam. Passive integrated transponder (PIT) tags will be injected into rainbow, bull, and cutthroat trout throughout the mainstem Kootenai River and selected tributaries to provide information on growth, survival, and migration patterns in relation to abiotic and biotic variables. Model simulations (RIVBIO) are used to calculate the effects of dam operations on the wetted perimeter and benthic biomass in the Kootenai River below Libby Dam. Additional models (IFIM) will also be used to evaluate the impacts of dam operations on the amount of available habitat for different life stages of rainbow and bull trout in the Kootenai River.« less

  10. Balancing hydropower production and river bed incision in operating a run-of-river hydropower scheme along the River Po

    NASA Astrophysics Data System (ADS)

    Denaro, Simona; Dinh, Quang; Bizzi, Simone; Bernardi, Dario; Pavan, Sara; Castelletti, Andrea; Schippa, Leonardo; Soncini-Sessa, Rodolfo

    2013-04-01

    Water management through dams and reservoirs is worldwide necessary to support key human-related activities ranging from hydropower production to water allocation, and flood risk mitigation. Reservoir operations are commonly planned in order to maximize these objectives. However reservoirs strongly influence river geomorphic processes causing sediment deficit downstream, altering the flow regime, leading, often, to process of river bed incision: for instance the variations of river cross sections over few years can notably affect hydropower production, flood mitigation, water supply strategies and eco-hydrological processes of the freshwater ecosystem. The river Po (a major Italian river) has experienced severe bed incision in the last decades. For this reason infrastructure stability has been negatively affected, and capacity to derive water decreased, navigation, fishing and tourism are suffering economic damages, not to mention the impact on the environment. Our case study analyzes the management of Isola Serafini hydropower plant located on the main Po river course. The plant has a major impact to the geomorphic river processes downstream, affecting sediment supply, connectivity (stopping sediment upstream the dam) and transport capacity (altering the flow regime). Current operation policy aims at maximizing hydropower production neglecting the effects in term of geomorphic processes. A new improved policy should also consider controlling downstream river bed incision. The aim of this research is to find suitable modeling framework to identify an operating policy for Isola Serafini reservoir able to provide an optimal trade-off between these two conflicting objectives: hydropower production and river bed incision downstream. A multi-objective simulation-based optimization framework is adopted. The operating policy is parameterized as a piecewise linear function and the parameters optimized using an interactive response surface approach. Global and local response surface are comparatively assessed. Preliminary results show that a range of potentially interesting trade-off policies exist able to better control river bed incision downstream without significantly decreasing hydropower production.

  11. Dam operations affect route-specific passage and survival of juvenile Chinook salmon at a main-stem diversion dam

    USGS Publications Warehouse

    Perry, Russell W.; Kock, Tobias J.; Couter, Ian I; Garrison, Thomas M; Hubble, Joel D; Child, David B

    2016-01-01

    Diversion dams can negatively affect emigrating juvenile salmon populations because fish must pass through the impounded river created by the dam, negotiate a passage route at the dam and then emigrate through a riverine reach that has been affected by reduced river discharge. To quantify the effects of a main-stem diversion dam on juvenile Chinook salmon in the Yakima River, Washington, USA, we used radio telemetry to understand how dam operations and river discharge in the 18-km reach downstream of the dam affected route-specific passage and survival. We found evidence of direct mortality associated with dam passage and indirect mortality associated with migration through the reach below the dam. Survival of fish passing over a surface spill gate (the west gate) was positively related to river discharge, and survival was similar for fish released below the dam, suggesting that passage via this route caused little additional mortality. However, survival of fish that passed under a sub-surface spill gate (the east gate) was considerably lower than survival of fish released downstream of the dam, with the difference in survival decreasing as river discharge increased. The probability of fish passing the dam via three available routes was strongly influenced by dam operations, with passage through the juvenile fish bypass and the east gate increasing with discharge through those routes. By simulating daily passage and route-specific survival, we show that variation in total survival is driven by river discharge and moderated by the proportion of fish passing through low-survival or high-survival passage routes.

  12. 75 FR 65299 - Endangered and Threatened Species; Recovery Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-22

    .../quantity. Address direct impacts of Willamette hydropower and flood control dam/reservoir operations by... eastside tributaries of the Willamette River; adverse thermal effects downstream from operation of the dams... spawning is high. c. Downstream passage survival of juvenile offspring through the reservoir and dam...

  13. An Evaluation of the Success Rate of Sermo Dam Management in Daerah Istimewa Yogyakarta

    NASA Astrophysics Data System (ADS)

    Andriawan, A.; Sobriyah; Ikhsan, C.

    2017-11-01

    In dam operating and maintaining activities, there are some activities becoming the main function: the assessment of dam condition to keep monitoring and safeguarding the condition of dam as the main building. To achieve the maximum service, the maximal dam management is required as well and it should be followed with management evaluation. This case study was taken place in Sermo Dam of Daerah Istimewa Yogyakarta during 2015 - 2017. The method applied in this study was descriptive quantitative one, conducting a research using primary and secondary data. In this research, the assessment of dam condition was viewed from 1 (one) component, dam body, so that the component weight was 100%. The value of dam body condition was obtained from data of Sermo Dam monitoring in 2015-2016 and from the result of field survey in 2017. The result of research showed that the condition values of Sermo Dam with dam body component were 92.66% in 2015, 92.99% in 2016, and 93.99% in 2017. The result also showed that the value of dam body condition tended to increase during 2015-2017. To maintain the condition, the maximal operation and maintenance of dam was recommended.

  14. Assessing the value of storage services in large-scale multireservoir systems

    NASA Astrophysics Data System (ADS)

    Tilmant, A.; Arjoon, D.; Guilherme, G. F.

    2012-12-01

    Following three decades of rather low investment in dams, many regions throughout the world are now seeking to further develop new storage capacity in order to meet exploding demands for water and to hedge against the risk posed by climate change. Storage capacity is indee perceived as a key element of climate change adaptation strategies, while at the same time contributing to socioeconomic development through irrigation, energy generation, fish production, and municipal and industrial water supply. The benefits provided by dams must be balanced with the associated environmental and social costs, which can take various forms such as the degradation of ecosystems due to altered flow regimes, the relocation of people from the impoundment area, etc. The benefits of storage essentially come from the ability to move water in time, making it available during the low flow season when it becomes more valuable. As river basins develop and new dams are constructed, it may be important for planning and operational purposes to assess the individual contribution of each reservoir to the benefits of storage. We present a methodology to determine the economic value of storage in multireservoir systems based on the marginal net benefit functions of storage. In economics, the marginal net benefit function for water represents the user's willingness to pay for various quantities of water, i.e. the demand for water. Here, we will concentrate on the marginal net benefit of storing raw water in a particular reservoir for later use by different users/sectors. Based on this function, one can determine the economic value associated with changes in storage from the reservoir operating policies and the marginal value of water stored in the reservoirs. This information can nowadays be obtained from multireservoir optimization models. A cascade of reservoirs in the upper reaches of the Euphrates river basin (Turkey/Syria) is used to illustrate the methodology. To water resources planners in both countries, the highly contrasted hydrologic regime of the Euphrates river could only be dealt with through storage. However, due to political tensions, those projects were carried out without much cooperation and coordination among riparian countries. The development started in the late 1960s with the construction of the head reservoir in Turkey (Keban dam) and the most downstream reservoir in Syria (Tabqa dam). Thirty years later, five other dams in both countries had been commissioned, changing the economy of this region through the export of hydroelectric power (7812 MW) and agricultural products (cotton and cereals). The operating policies and marginal water values of this multipurpose multiresevoir system are determined using Stochastic Dual Dynamic Programming, an optimization algorithm that can handle large-scale reservoir operation problems while keeping an individual representation of the hydraulic infrastructure and the demand sites. The analysis of the simulation results reveal that the average value of storage for the entire cascade of reservoirs is around 420 million US/a, which is 18% of the annual short-run benefits of the system (2.26 billion US/a).

  15. Computation and analysis of the instantaneous-discharge record for the Colorado River at Lees Ferry, Arizona : May 8, 1921, through September 30, 2000

    USGS Publications Warehouse

    Topping, David J.; Schmidt, John C.; Vierra, L.E.

    2003-01-01

    A gaging station has been operated by the U.S. Geological Survey at Lees Ferry, Arizona, since May 8, 1921. In March 1963, Glen Canyon Dam was closed 15.5 miles upstream, cutting off the upstream sediment supply and regulating the discharge of the Colorado River at Lees Ferry for the first time in history. To evaluate the pre-dam variability in the hydrology of the Colorado River, and to determine the effect of the operation of Glen Canyon Dam on the downstream hydrology of the river, a continuous record of the instantaneous discharge of the river at Lees Ferry was constructed and analyzed for the entire period of record between May 8, 1921, and September 30, 2000. This effort involved retrieval from the Federal Records Centers and then synthesis of all the raw historical data collected by the U.S. Geological Survey at Lees Ferry. As part of this process, the peak discharges of the two largest historical floods at Lees Ferry, the 1884 and 1921 floods, were reanalyzed and recomputed. This reanalysis indicates that the peak discharge of the 1884 flood was 210,000?30,000 cubic feet per second (ft3/s), and the peak discharge of the 1921 flood was 170,000?20,000 ft3/s. These values are indistinguishable from the peak discharges of these floods originally estimated or published by the U.S. Geological Survey, but are substantially less than the currently accepted peak discharges of these floods. The entire continuous record of instantaneous discharge of the Colorado River at Lees Ferry can now be requested from the U.S. Geological Survey Grand Canyon Monitoring and Research Center, Flagstaff, Arizona, and is also available electronically at http://www.gcmrc.gov. This record is perhaps the longest (almost 80 years) high-resolution (mostly 15- to 30-minute precision) times series of river discharge available. Analyses of these data, therefore, provide an unparalleled characterization of both the natural variability in the discharge of a river and the effects of dam operations on a river. Following the construction and quality-control checks of the continuous record of instantaneous discharge, analyses of flow duration, sub-daily flow variability, and flood frequency were conducted on the pre- and post-dam parts of the record. These analyses indicate that although the discharge of the Colorado River varied substantially prior to the closure of Glen Canyon Dam in 1963, operation of the dam has caused changes in discharge that are more extreme than the pre-dam natural variability. Operation of the dam has eliminated flood flows and base flows, and thereby has effectively 'flattened' the annual hydrograph. Prior to closure of the dam, the discharge of the Colorado River at Lees Ferry was lower than 7,980 ft3/s half of the time. Discharges lower than about 9,000 ft3/s were important for the seasonal accumulation and storage of sand in the pre-dam river downstream from Lees Ferry. The current operating plan for Glen Canyon Dam no longer allows sustained discharges lower than 8,000 ft3/s to be released. Thus, closure of the dam has not only cut off the upstream supply of sediment, but operation of the dam has also largely eliminated discharges during which sand could be demonstrated to accumulate in the river. In addition to radically changing the hydrology of the river, operation of the dam for hydroelectric-power generation has introduced large daily fluctuations in discharge. During the pre-dam era, the median daily range in discharge was only 542 ft3/s, although daily ranges in discharge exceeding 20,000 ft3/s were observed during the summer thunderstorm season. Relative to the pre-dam period of record, dam operations have increased the daily range in discharge during all but 0.1 percent of all days. The post-dam median daily range in discharge, 8,580 ft3/s, exceeds the pre-dam median discharge of 7,980 ft3/s. Operation of the dam has also radically changed the frequency of floods on the Colorado River at Lees Ferry. The frequency of f

  16. Climate change impact on operation of dams and hydroelectricity generation in the Northeastern United States

    NASA Astrophysics Data System (ADS)

    Ehsani, N.; Vorosmarty, C. J.; Fekete, B. M.

    2016-12-01

    We are using a large-scale, high-resolution, fully integrated hydrological/reservoir/hydroelectricity model to investigate the impact of climate change on the operation of 11037 dams and generation of electricity from 375 hydroelectric power plants in the Northeastern United States. Moreover, we estimate the hydropower potential of the region by energizing the existing non-powered dams and then studying the impact of climate change on the hydropower potential. We show that climate change increases the impact of dams on the hydrology of the region. Warmer temperatures produce shorter frozen periods, earlier snowmelt and elevated evapotranspiration rates, which when combined with changes in precipitation, are projected to increase water availability in winter but reduce it during summer. As a result, the water that is stored by dams will be more than ever a necessary part of the routine water systems operations to compensate for these seasonal imbalances. The function of dams as emergency water storage for creating drought resiliency will mostly diminish in the future. Building more dams to cope with the local impacts of climate change on water resources and to offset the increased drought vulnerability may thus be inevitable. Annual hydroelectricity generation in the region is 41 Twh. Our estimate of the annual hydropower potential of non-powered dams adds up to 350 Twh. Climate change may reduce hydropower potential from non-powered dams by up to 13% and reduce current hydroelectricity generation by up to 8% annually. Hydroelectricity generation and hydropower potential may increase in winter months and decline in months of summer and fall. These changes call for recalibration of dam operations and may raise conflict of interests in multipurpose dams.

  17. Are Wind Power and Hydropower Complements or Competitors? An Analysis of Ecosystem Service Constraints in the Roanoke Basin

    NASA Astrophysics Data System (ADS)

    Reed, P. M.; Fernandez, A. R.; Blumsack, S.

    2011-12-01

    Hydropower can provide inexpensive, flexible fill-in power to compensate for intermittent renewable generation. Policies for hydropower dams maintain multiple services beyond electric generation, including environmental protection, flood control and recreation. We model the decision of a hydroelectric generator to shift some of its power production capacity away from the day-ahead energy market into a "wind-following" service that smoothes the intermittent production of wind turbines. Offering such a service imposes both private and social opportunity costs. Since fluctuations in wind energy output are not perfectly correlated with day-ahead energy prices, a wind-following service will necessarily affect generator revenues. Seasonal wind patterns produce conflicts with the goal of managing rivers for "ecosystem services" - the maintenance or enhancement of downstream ecosystems. We illustrate our decision model using the Kerr Dam in PJM's territory in North Carolina. We simulate the operation of Kerr Dam over a three-year period that features hydrologic variability from normal water years to extreme drought conditions. We use an optimization framework to estimate reservation prices for Kerr Dam offering wind-following services in the PJM market. Wind-following may be profitable for Kerr Dam at low capacity levels during some time periods if ecosystems services are neglected and if side payments, or reserves-type payments, are provided. Wind-following with ecosystem services yields revenue losses that typically cannot be recovered with reserves market payments. Water release patterns are inconsistent with ecosystem-services goals when Kerr Dam dedicates significant capacity to wind-following, particularly in drought years.

  18. Hydroeconomic Analysis of the Balance between Renewable Wind Energy, Hydropower, and Ecosystems Services in the Roanoke River Basin

    NASA Astrophysics Data System (ADS)

    Fernandez, A.; Blumsack, S.; Reed, P.

    2012-04-01

    Hydropower can provide inexpensive, flexible fill-in power to compensate for intermittent renewable generation. Policies for hydropower dams maintain multiple services beyond electric generation, including environmental protection, flood control and recreation. We model the decision of a hydroelectric generator to shift some of its power production capacity away from the day-ahead energy market into a "wind-following" service that smoothes the intermittent production of wind turbines. Offering such a service imposes both private and social opportunity costs. Since fluctuations in wind energy output are not perfectly correlated with day-ahead energy prices, a wind-following service will necessarily affect generator revenues. Seasonal wind patterns produce conflicts with the goal of managing rivers for "ecosystem services" - the maintenance or enhancement of downstream ecosystems. We illustrate our decision model using the Kerr Dam in PJM's territory in North Carolina. We simulate the operation of Kerr Dam over a three-year period that features hydrologic variability from normal water years to extreme drought conditions. We use an optimization framework to estimate reservation prices for Kerr Dam offering wind-following services in the PJM market. Wind-following may be profitable for Kerr Dam at low capacity levels during some time periods if ecosystems services are neglected and if side payments, or reserves-type payments, are provided. Wind-following with ecosystem services yields revenue losses that typically cannot be recovered with reserves market payments. Water release patterns are inconsistent with ecosystem-services goals when Kerr Dam dedicates significant capacity to wind-following, particularly in drought years.

  19. Water temperature effects from simulated changes to dam operations and structures in the Middle and South Santiam Rivers, Oregon

    USGS Publications Warehouse

    Buccola, Norman L.

    2017-05-31

    Green Peter and Foster Dams on the Middle and South Santiam Rivers, Oregon, have altered the annual downstream water temperature profile (cycle). Operation of the dams has resulted in cooler summer releases and warmer autumn releases relative to pre-dam conditions, and that alteration can hinder recovery of various life stages of threatened spring-run Chinook salmon (Oncorhyncus tshawytscha) and winter steelhead (O. mykiss). Lake level management and the use of multiple outlets from varying depths at the dams can enable the maintenance of a temperature regime more closely resembling that in which the fish evolved by releasing warm surface water during summer and cooler, deeper water in the autumn. At Green Peter and Foster Dams, the outlet configuration is such that temperature control is often limited by hydropower production at the dams. Previously calibrated CE-QUAL-W2 water temperature models of Green Peter and Foster Lakes were used to simulate the downstream thermal effects from hypothetical structures and modified operations at the dams. Scenarios with no minimum power production requirements allowed some releases through shallower and deeper outlets (summer and autumn) to achieve better temperature control throughout the year and less year-to-year variability in autumn release temperatures. Scenarios including a hypothetical outlet floating 1 meter below the lake surface resulted in greater ability to release warm water during summer compared to existing structures. Later in Autumn (October 15–December 31), a limited amount of temperature control was realized downstream from Foster Dam by scenarios limited to operational changes with existing structures, resulting in 15-day averages within 1.0 degree Celsius of current operations.

  20. Recent sediment studies refute Glen Canyon Dam hypothesis

    USGS Publications Warehouse

    Rubin, David M.; Topping, David J.; Schmidt, John C.; Hazel, Joe; Kaplinski, Matt; Melis, Theodore S.

    2002-01-01

    Recent studies of sedimentology hydrology, and geomorphology indicate that releases from Glen Canyon Dam are continuing to erode sandbars and beaches in the Colorado River in Grand Canyon National Park, despite attempts to restore these resources. The current strategy for dam operations is based on the hypothesis that sand supplied by tributaries of the Colorado River downstream from the dam will accumulate in the channel during normal dam operations and remain available for restoration floods. Recent work has shown that this hypothesis is false, and that tributary sand inputs are exported downstream rapidly typically within weeks or months under the current flow regime.

  1. Attitudes of Operative Dentistry Faculty toward Rubber Dam Isolation.

    ERIC Educational Resources Information Center

    Brackett, William W.; And Others

    1989-01-01

    Dental faculty responses (N=332) to a survey concerning use of rubber dams for excluding fluids from the working field in operative dentistry procedures indicated students receive adequate instruction in rubber dam use and are proficient at graduation, though motivating students to its use is problematic and patient resistance a factor. (MSE)

  2. How do new dams impact downstream countries? - A screening approach to identify the best compromise assets and negotiate their designs

    NASA Astrophysics Data System (ADS)

    Geressu, Robel; Harou, Julien

    2015-04-01

    Water use rights are disputed in many transboundary basins. Even when water projects can benefit all, agreeing on cost and benefit sharing can be difficult where stakeholders have conflicting preferences on the designs and use of proposed water infrastructures. This study suggests a combination of many objective optimization and multi-criteria ranking methods to support negotiations regarding designs of new assets. The method allows competing users to assess development options based on their individual perspectives and agree on designs by incorporating coordination strategies into multi-reservoir system designs. We demonstrate a hypothetical negotiation on proposed Blue Nile reservoirs. The result form a set of Pareto-optimal designs i.e., reservoirs, storage capacity and their operating rules, and power trade, cost sharing and/or financing coordination strategies, which maximize benefit to all countries and show which trade-offs are implied by which designs. The approach fulfils decision-maker's desire to understand a) the critical design parameters that affect various objectives and b) how coordination mechanisms would enable them to incur benefits from proposed new dams.

  3. Managing the water-energy-food nexus: Gains and losses from new water development in Amu Darya River Basin

    NASA Astrophysics Data System (ADS)

    Jalilov, Shokhrukh-Mirzo; Keskinen, Marko; Varis, Olli; Amer, Saud; Ward, Frank A.

    2016-08-01

    According to the UN, the population of Central Asia will increase from its current approximately 65 million people to a well over 90 million by the end of this century. Taking this increasing population into consideration, it is impossible to project development strategies without considering three key factors in meeting the demands of a growing population: water, food and energy. Societies will have to choose, for instance, between using land and fertilizer for food production or for bio-based or renewable energy production, and between using fresh water for energy production or for irrigating crops. Thus water, food and energy are inextricably linked and must be considered together as a system. Recently, tensions among the Central Asian countries over the use of water for energy and energy production have increased with the building of Rogun Dam on the Vakhsh River, a tributary of the Amu Darya River. The dam will provide upstream Tajikistan with hydropower, while downstream countries fear it could negatively impact their irrigated agriculture. Despite recent peer reviewed literature on water resources management in Amu Darya Basin, none to date have addressed the interconnection and mutual impacts within water-energy-food systems in face of constructing the Rogun Dam. We examine two potential operation modes of the dam: Energy Mode (ensuring Tajikistan's hydropower needs) and Irrigation Mode (ensuring water for agriculture downstream). Results show that the Energy Mode could ensure more than double Tajikistan's energy capacity, but would reduce water availability during the growing season, resulting in an average 37% decline in agricultural benefits in downstream countries. The Irrigation Mode could bring a surplus in agricultural benefits to Tajikistan and Uzbekistan in addition an increasing energy benefits in Tajikistan by two fold. However, energy production in the Irrigation Mode would be non-optimally distributed over the seasons resulting in the most of hydropower being produced during the growing season. Neither operation mode provides optimal benefits for all the countries, emphasizing how difficult it is to actually reach a win-win scenario across the water-energy-food security nexus in transboundary river basins.

  4. Water temperature effects from simulated dam operations and structures in the Middle Fork Willamette River, western Oregon

    USGS Publications Warehouse

    Buccola, Norman L.; Turner, Daniel F.; Rounds, Stewart A.

    2016-09-14

    Significant FindingsStreamflow and water temperature in the Middle Fork Willamette River (MFWR), western Oregon, have been regulated and altered since the construction of Lookout Point, Dexter, and Hills Creek Dams in 1954 and 1961, respectively. Each year, summer releases from the dams typically are cooler than pre-dam conditions, with the reverse (warmer than pre-dam conditions) occurring in autumn. This pattern has been detrimental to habitat of endangered Upper Willamette River (UWR) Chinook salmon (Oncorhynchus tshawytscha) and UWR winter steelhead (O. mykiss) throughout multiple life stages. In this study, scenarios testing different dam-operation strategies and hypothetical dam-outlet structures were simulated using CE-QUAL-W2 hydrodynamic/temperature models of the MFWR system from Hills Creek Lake (HCR) to Lookout Point (LOP) and Dexter (DEX) Lakes to explore and understand the efficacy of potential flow and temperature mitigation options.Model scenarios were run in constructed wet, normal, and dry hydrologic calendar years, and designed to minimize the effects of Hills Creek and Lookout Point Dams on river temperature by prioritizing warmer lake surface releases in May–August and cooler, deep releases in September–December. Operational scenarios consisted of a range of modified release rate rules, relaxation of power-generation constraints, variations in the timing of refill and drawdown, and maintenance of different summer maximum lake levels at HCR and LOP. Structural scenarios included various combinations of hypothetical floating outlets near the lake surface and hypothetical new outlets at depth. Scenario results were compared to scenarios using existing operational rules that give temperature management some priority (Base), scenarios using pre-2012 operational rules that prioritized power generation over temperature management (NoBlend), and estimated temperatures from a without-dams condition (WoDams).Results of the tested model scenarios led to the following conclusions:The existing outlets at Lookout Point Dam, because of the range of depths, allow for greater temperature control than the two existing outlets at Hills Creek Dam that are relatively deep.Temperature control at HCR through operational scenarios generally was minimal near Hills Creek Dam, but improved downstream toward the head of LOP when decreased release rates held HCR at a low lake elevation year-round.Inflows from unregulated streams between HCR and LOP helped to dilute the effects of HCR and achieve more natural stream temperatures before the MFWR entered LOP.The relative benefit of any particular scenario depended on the location in the MFWR system used to assess the potential change, with most scenarios involving changes to Hills Creek Dam being less effective with increasing downstream distance, such as downstream of DEX.To achieve as much temperature control as the most successful structural scenarios, which were able to resemble without-dam conditions for part of the year, most operational scenarios had to be free of any power-generation requirements at Lookout Point Dam.Downstream of DEX, scenarios incorporating a hypothetical floating outlet at either HCR or LOP resulted in similar temperatures, with both scenarios causing a delay in the estimated spring Chinook egg emergence by about 9–10 days compared to base-case temperature-management scenarios.

  5. Authorized and Operating Purposes of Corps of Engineers Reservoirs

    DTIC Science & Technology

    1992-07-01

    Puerto Rico CERRILLOS DAM AND RESERVOIR Jacksonville E-9O PORTUGUES DAM AND RESERVOIR Jacksonville E-92 South Carolina HARTWELL DAM AND LAKE Savannah E...LAKE Missouri Kansas City E-12 POMONA LAKE Kansas Kansas City E-12 PORTUGUES DAM AND RESERVOIR Puerto Rico Jacksonville E-92 PRADO DAM (SANTA ANA...PROJECT Florida Jacksonville E-92 PORTUGUES DAM AND RESERVOIR Puerto Rico Jacksonville E-92 RODMAN LOCK AND DAM (CROSS FLORIDA BARGE CANAL Florida

  6. Classification of US hydropower dams by their modes of operation

    DOE PAGES

    McManamay, Ryan A.; Oigbokie, II, Clement O.; Kao, Shih -Chieh; ...

    2016-02-19

    A key challenge to understanding ecohydrologic responses to dam regulation is the absence of a universally transferable classification framework for how dams operate. In the present paper, we develop a classification system to organize the modes of operation (MOPs) for U.S. hydropower dams and powerplants. To determine the full diversity of MOPs, we mined federal documents, open-access data repositories, and internet sources. W then used CART classification trees to predict MOPs based on physical characteristics, regulation, and project generation. Finally, we evaluated how much variation MOPs explained in sub-daily discharge patterns for stream gages downstream of hydropower dams. After reviewingmore » information for 721 dams and 597 power plants, we developed a 2-tier hierarchical classification based on 1) the storage and control of flows to powerplants, and 2) the presence of a diversion around the natural stream bed. This resulted in nine tier-1 MOPs representing a continuum of operations from strictly peaking, to reregulating, to run-of-river, and two tier-2 MOPs, representing diversion and integral dam-powerhouse configurations. Although MOPs differed in physical characteristics and energy production, classification trees had low accuracies (<62%), which suggested accurate evaluations of MOPs may require individual attention. MOPs and dam storage explained 20% of the variation in downstream subdaily flow characteristics and showed consistent alterations in subdaily flow patterns from reference streams. Lastly, this standardized classification scheme is important for future research including estimating reservoir operations for large-scale hydrologic models and evaluating project economics, environmental impacts, and mitigation.« less

  7. Classification of US hydropower dams by their modes of operation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McManamay, Ryan A.; Oigbokie, II, Clement O.; Kao, Shih -Chieh

    A key challenge to understanding ecohydrologic responses to dam regulation is the absence of a universally transferable classification framework for how dams operate. In the present paper, we develop a classification system to organize the modes of operation (MOPs) for U.S. hydropower dams and powerplants. To determine the full diversity of MOPs, we mined federal documents, open-access data repositories, and internet sources. W then used CART classification trees to predict MOPs based on physical characteristics, regulation, and project generation. Finally, we evaluated how much variation MOPs explained in sub-daily discharge patterns for stream gages downstream of hydropower dams. After reviewingmore » information for 721 dams and 597 power plants, we developed a 2-tier hierarchical classification based on 1) the storage and control of flows to powerplants, and 2) the presence of a diversion around the natural stream bed. This resulted in nine tier-1 MOPs representing a continuum of operations from strictly peaking, to reregulating, to run-of-river, and two tier-2 MOPs, representing diversion and integral dam-powerhouse configurations. Although MOPs differed in physical characteristics and energy production, classification trees had low accuracies (<62%), which suggested accurate evaluations of MOPs may require individual attention. MOPs and dam storage explained 20% of the variation in downstream subdaily flow characteristics and showed consistent alterations in subdaily flow patterns from reference streams. Lastly, this standardized classification scheme is important for future research including estimating reservoir operations for large-scale hydrologic models and evaluating project economics, environmental impacts, and mitigation.« less

  8. State-discharge relations at dams on the Illinois and Des Plaines rivers in Illinois

    USGS Publications Warehouse

    Mades, Dean M.

    1981-01-01

    Stage-discharge relations were developed for the Brandon Road Dam on the Des Plainse River and the Dresden Island, Marseilles, Starved Rock, Peoria, and La Grange Dams on the Illinois River. At Brandon Road Dam, streamflow is regulated by the operation of tainter gates and headgates. Tainter gates are operated to regulate streamflow at the Dresden Island, Marseilles, and Starved Rock Dams. Peoria Dam and La Grange Dam comprise timber Chanoine wickets which are lowered to a horizontal position on the streambed when used for streamflow regulation. Both dams have concrete abutments housing butterfly valves that are also used for regulation. A total of 50 discharge measurements ranging from 49.0 to 2,450 cubic meter per second were used to determine discharge coefficients in equations expressing discharge as a function of headwater depth, tailwater depth, and gate opening. A stage-discharge relation for Chanoine wicket dams developed from a U.S. Army Corps of Engineers hydraulic model study in 1937 and 1938 was verified with discharge measurements made downstream from the Peoria and La Grange Dams. (USGS)

  9. National Dam Safety Program. Wappingers Falls Dam (I.D. Number N.Y. 3, D.E.C. 613A), Hudson River Basin, Dutchess County, New York. Phase 1 Inspection Report

    DTIC Science & Technology

    1980-09-30

    Classification 2I e. Ownership 2f. Purpose of Dam 2 g. Design and Construction History 2h. Normal Operating Procedure 2 1.3 PERTINENT DATA 2 a. Drainage...4 2.2 SUBSURFACE INVESTIGATION 4 2.3 DAM AND APPURTENANT STRUCTURES 4 2.4 CONSTRUCTION RECORDS 4 2.5 OPERATION RECORDS 2.6 EVALUATION OF DATA 5 4...12 a. Visual Observations 12 b. Design and Construction Data 12 c. Stability Analysis 12 d. Operating Records 13 e. Post- Construction Changes 13 f

  10. Multi-time scale Climate Informed Stochastic Hybrid Simulation-Optimization Model (McISH model) for Multi-Purpose Reservoir System

    NASA Astrophysics Data System (ADS)

    Lu, M.; Lall, U.

    2013-12-01

    In order to mitigate the impacts of climate change, proactive management strategies to operate reservoirs and dams are needed. A multi-time scale climate informed stochastic model is developed to optimize the operations for a multi-purpose single reservoir by simulating decadal, interannual, seasonal and sub-seasonal variability. We apply the model to a setting motivated by the largest multi-purpose dam in N. India, the Bhakhra reservoir on the Sutlej River, a tributary of the Indus. This leads to a focus on timing and amplitude of the flows for the monsoon and snowmelt periods. The flow simulations are constrained by multiple sources of historical data and GCM future projections, that are being developed through a NSF funded project titled 'Decadal Prediction and Stochastic Simulation of Hydroclimate Over Monsoon Asia'. The model presented is a multilevel, nonlinear programming model that aims to optimize the reservoir operating policy on a decadal horizon and the operation strategy on an updated annual basis. The model is hierarchical, in terms of having a structure that two optimization models designated for different time scales are nested as a matryoshka doll. The two optimization models have similar mathematical formulations with some modifications to meet the constraints within that time frame. The first level of the model is designated to provide optimization solution for policy makers to determine contracted annual releases to different uses with a prescribed reliability; the second level is a within-the-period (e.g., year) operation optimization scheme that allocates the contracted annual releases on a subperiod (e.g. monthly) basis, with additional benefit for extra release and penalty for failure. The model maximizes the net benefit of irrigation, hydropower generation and flood control in each of the periods. The model design thus facilitates the consistent application of weather and climate forecasts to improve operations of reservoir systems. The decadal flow simulations are re-initialized every year with updated climate projections to improve the reliability of the operation rules for the next year, within which the seasonal operation strategies are nested. The multi-level structure can be repeated for monthly operation with weekly subperiods to take advantage of evolving weather forecasts and seasonal climate forecasts. As a result of the hierarchical structure, sub-seasonal even weather time scale updates and adjustment can be achieved. Given an ensemble of these scenarios, the McISH reservoir simulation-optimization model is able to derive the desired reservoir storage levels, including minimum and maximum, as a function of calendar date, and the associated release patterns. The multi-time scale approach allows adaptive management of water supplies acknowledging the changing risks, meeting both the objectives over the decade in expected value and controlling the near term and planning period risk through probabilistic reliability constraints. For the applications presented, the target season is the monsoon season from June to September. The model also includes a monthly flood volume forecast model, based on a Copula density fit to the monthly flow and the flood volume flow. This is used to guide dynamic allocation of the flood control volume given the forecasts.

  11. Hydropower Optimization Using Artificial Neural Network Surrogate Models of a High-Fidelity Hydrodynamics and Water Quality Model

    NASA Astrophysics Data System (ADS)

    Shaw, Amelia R.; Smith Sawyer, Heather; LeBoeuf, Eugene J.; McDonald, Mark P.; Hadjerioua, Boualem

    2017-11-01

    Hydropower operations optimization subject to environmental constraints is limited by challenges associated with dimensionality and spatial and temporal resolution. The need for high-fidelity hydrodynamic and water quality models within optimization schemes is driven by improved computational capabilities, increased requirements to meet specific points of compliance with greater resolution, and the need to optimize operations of not just single reservoirs but systems of reservoirs. This study describes an important advancement for computing hourly power generation schemes for a hydropower reservoir using high-fidelity models, surrogate modeling techniques, and optimization methods. The predictive power of the high-fidelity hydrodynamic and water quality model CE-QUAL-W2 is successfully emulated by an artificial neural network, then integrated into a genetic algorithm optimization approach to maximize hydropower generation subject to constraints on dam operations and water quality. This methodology is applied to a multipurpose reservoir near Nashville, Tennessee, USA. The model successfully reproduced high-fidelity reservoir information while enabling 6.8% and 6.6% increases in hydropower production value relative to actual operations for dissolved oxygen (DO) limits of 5 and 6 mg/L, respectively, while witnessing an expected decrease in power generation at more restrictive DO constraints. Exploration of simultaneous temperature and DO constraints revealed capability to address multiple water quality constraints at specified locations. The reduced computational requirements of the new modeling approach demonstrated an ability to provide decision support for reservoir operations scheduling while maintaining high-fidelity hydrodynamic and water quality information as part of the optimization decision support routines.

  12. Hydropower Optimization Using Artificial Neural Network Surrogate Models of a High-Fidelity Hydrodynamics and Water Quality Model

    DOE PAGES

    Shaw, Amelia R.; Sawyer, Heather Smith; LeBoeuf, Eugene J.; ...

    2017-10-24

    Hydropower operations optimization subject to environmental constraints is limited by challenges associated with dimensionality and spatial and temporal resolution. The need for high-fidelity hydrodynamic and water quality models within optimization schemes is driven by improved computational capabilities, increased requirements to meet specific points of compliance with greater resolution, and the need to optimize operations of not just single reservoirs but systems of reservoirs. This study describes an important advancement for computing hourly power generation schemes for a hydropower reservoir using high-fidelity models, surrogate modeling techniques, and optimization methods. The predictive power of the high-fidelity hydrodynamic and water quality model CE-QUAL-W2more » is successfully emulated by an artificial neural network, then integrated into a genetic algorithm optimization approach to maximize hydropower generation subject to constraints on dam operations and water quality. This methodology is applied to a multipurpose reservoir near Nashville, Tennessee, USA. The model successfully reproduced high-fidelity reservoir information while enabling 6.8% and 6.6% increases in hydropower production value relative to actual operations for dissolved oxygen (DO) limits of 5 and 6 mg/L, respectively, while witnessing an expected decrease in power generation at more restrictive DO constraints. Exploration of simultaneous temperature and DO constraints revealed capability to address multiple water quality constraints at specified locations. Here, the reduced computational requirements of the new modeling approach demonstrated an ability to provide decision support for reservoir operations scheduling while maintaining high-fidelity hydrodynamic and water quality information as part of the optimization decision support routines.« less

  13. Hydropower Optimization Using Artificial Neural Network Surrogate Models of a High-Fidelity Hydrodynamics and Water Quality Model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shaw, Amelia R.; Sawyer, Heather Smith; LeBoeuf, Eugene J.

    Hydropower operations optimization subject to environmental constraints is limited by challenges associated with dimensionality and spatial and temporal resolution. The need for high-fidelity hydrodynamic and water quality models within optimization schemes is driven by improved computational capabilities, increased requirements to meet specific points of compliance with greater resolution, and the need to optimize operations of not just single reservoirs but systems of reservoirs. This study describes an important advancement for computing hourly power generation schemes for a hydropower reservoir using high-fidelity models, surrogate modeling techniques, and optimization methods. The predictive power of the high-fidelity hydrodynamic and water quality model CE-QUAL-W2more » is successfully emulated by an artificial neural network, then integrated into a genetic algorithm optimization approach to maximize hydropower generation subject to constraints on dam operations and water quality. This methodology is applied to a multipurpose reservoir near Nashville, Tennessee, USA. The model successfully reproduced high-fidelity reservoir information while enabling 6.8% and 6.6% increases in hydropower production value relative to actual operations for dissolved oxygen (DO) limits of 5 and 6 mg/L, respectively, while witnessing an expected decrease in power generation at more restrictive DO constraints. Exploration of simultaneous temperature and DO constraints revealed capability to address multiple water quality constraints at specified locations. Here, the reduced computational requirements of the new modeling approach demonstrated an ability to provide decision support for reservoir operations scheduling while maintaining high-fidelity hydrodynamic and water quality information as part of the optimization decision support routines.« less

  14. Study of optimizing water utilization in Benanga reservoir for irrigation and fresh water purposes

    NASA Astrophysics Data System (ADS)

    Tamrin; Retati, E.

    2018-04-01

    Benanga dam was built in1978an irrigation weir but currently it was developed into a multipurpose dam. However, based on the capacity curve measurement in 2015, the capacity curve measurement has been changed to get below. The runoff rate is calculated by using NRECA method, andwater reservoir volume is calculated by using penman modification method. The cropping pattern that has been implemented by the farmer of Lempake sincein Februaryis Paddy-Paddy-Fallow While the proposed cropping pattern in Benanga reservoir started on December, that proposed is based on the service ability for both raw water demands like irrigation and fresh water and if early planting is started besides these two months the elevation of benanga reservoir will not reach the normal elevation effective storage which is the condition pattern of reservoir operation.

  15. Multiple-Purpose Project, Osage River Basin, Osage River, Missouri. Harry S. Truman Dam & Reservoir Operation and Maintenance Manual. Appendix VII. Volume 1. Construction Foundation Report.

    DTIC Science & Technology

    1984-01-01

    RIVER MISSOURI Report from September 1966 HARRY S. TROMAN DAM & RESERVOIR November 1979 OPERATION AND MAINTENANCE MANUAL 6 PERFORMING DRG. REPORT N4040E...Two of this report ) VII- I- xxiv ............................. .... ... .... ... . .2. . . OPERATION AND MAINTENANCE MANUAL HARRY S. TRUMAN DAM AND...RESERVOIR OSAGE RIVER, MISSOURI APPENDIX VII CONSTRUCTION FOUNDATION REPORT CHAPTER 1 INTRODUCTION 1-01. Location and Description of Project: Harry S

  16. Water Management Models in Practice: A Case Study of the Aswan High Dam

    NASA Astrophysics Data System (ADS)

    El-Ashry, M. T.; Alford, D. L.

    1984-04-01

    The stated purpose of this volume is the development and evaluation of operating policies for the Aswan High Dam and their relation to the development of water resources policy in Egypt. That objective is admirably fulfilled through discussions of water use in Egypt and the operation objectives of the High Dam, the behavior of the physical system and simulation of the reservoir, a realtime management model of the dam, management of water shortages and trade-offs between major uses, and coordinated operation of the dam with new upstream as well as downstream developments.The High Dam has been a source of controversy, particularly with regard to its environmental impacts. Its adverse effects include changes in the water table and attendant salt buildup in irrigated areas, excessive growth of aquatic plants below the dam, shoreline erosion, and increases in water-borne diseases such as schistosomiasis (bilharzia). The dam was intended to offset rapid population growth by increasing food supplies through the transformation of irrigated land in southern Egypt from seasonal to perennial cultivation and by providing water for the reclamation of desert land. Unfortunately, such benefits have been outstripped by the rapidly growing population, and water shortages will be experienced by the end of the century.

  17. Is there enough sand? Evaluating the fate of Grand Canyon sandbars

    USGS Publications Warehouse

    Wright, S.A.; Schmidt, J.C.; Meles, T.S.; Topping, D.J.; Rubin, D.M.

    2008-01-01

    Large dams have the potential to dramatically alter the flow regime, geomorphology, and aquatic ecosystem of downstream river reaches. Development of flow release regimes in order to meet multiple objectives is a challenge facing dam operators, resource managers, and scientists. Herein, we review previous work and present new analyses related to the effects of Glen Canyon Dam on the downstream reach of the Colorado River in Marble and Grand Canyons. The dam traps the entire incoming sediment load in Lake Powell and modulates the hydrologic regime by, for example, eliminating spring snowmelt floods, resulting in changes in the geomorphology of the river downstream. The primary geomorphic impact has been the erosion of sandbars along the banks of the river. Recognition of this impact has led to many scientific studies and a variety of experimental operations of Glen Canyon Dam with the goal of rebuilding the eroding sandbars. These efforts have thus far been generally unsuccessful and the question remains as to whether or not the dam can be operated such that sandbars can be rebuilt and maintained over extended periods with the existing sediment supply. We attempt to answer this question by evaluating a dam operation that may be considered a "best-case scenario" for rebuilding and maintaining eroded sandbars. Our analysis suggests that this best-case scenario may indeed have viability for rebuilding sandbars, and that the initial rate at which sandbars could be rebuilt is comparable to the rate at which sandbars have been eroded since dam construction. The question remains open as to the viability of operations that deviate from the best-case scenario that we have defined.

  18. Quantification and Multi-purpose Allocation of Water Resources in a Dual-reservoir System

    NASA Astrophysics Data System (ADS)

    Salami, Y. D.

    2017-12-01

    Transboundary rivers that run through separate water management jurisdictions sometimes experience competitive water usage. Where the river has multiple existing or planned dams along its course, quantification and efficient allocation of water for such purposes as hydropower generation, irrigation for agriculture, and water supply can be a challenge. This problem is even more pronounced when large parts of the river basin are located in semi-arid regions known for water insecurity, poor crop yields from irrigation scheme failures, and human population displacement arising from water-related conflict. This study seeks to mitigate the impacts of such factors on the Kainji-Jebba dual-reservoir system located along the Niger River in Africa by seasonally quantifying and efficiently apportioning water to all stipulated uses of both dams thereby improving operational policy and long-term water security. Historical storage fluctuations (18 km3 to 5 km3) and flows into and out of both reservoirs were analyzed for relationships to such things as surrounding catchment contribution, dam operational policies, irrigation and hydropower requirements, etc. Optimum values of the aforementioned parameters were then determined by simulations based upon hydrological contributions and withdrawals and worst case scenarios of natural and anthropogenic conditions (like annual probability of reservoir depletion) affecting water availability and allocation. Finally, quantification and optimized allocation of water was done based on needs for hydropower, irrigation for agriculture, water supply, and storage evacuation for flood control. Results revealed that water supply potential increased by 69%, average agricultural yield improved by 36%, and hydropower generation increased by 54% and 66% at the upstream and downstream dams respectively. Lessons learned from this study may help provide a robust and practical means of water resources management in similar river basins and multi-reservoir systems.

  19. Management plan for White Oak Dam. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ahmed, S.B.

    1997-03-01

    The purpose is to provide operation and maintenance, periodic inspection, and emergency action plans for White Oak Dam in general accordance with the Federal Emergency Management Agency (FEMA) guidelines for dam safety. It must be understood that operations at the site are primarily for purposes of environmental monitoring, environmental protection and waste management operations control. Effluent is generally allowed to flow from the lake at its natural rate by rising above the broad crested weir notch elevation of 744 feet m.s.l.

  20. Hydroacoustic Evaluation of Overwintering Summer Steelhead Fallback and Kelt Passage at The Dalles Dam 2008-2009

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Khan, Fenton; Johnson, Gary E.; Weiland, Mark A.

    2009-09-01

    This report presents the results of an evaluation of overwintering summer steelhead (Oncorhynchus mykiss) fallback and early out-migrating steelhead kelts downstream passage at The Dalles Dam (TDA) sluiceway and turbines during fall/winter 2008 and early spring 2009, respectively. The study was conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers, Portland District (USACE). Operating the sluiceway reduces the potential for hydropower production. However, this surface flow outlet may be the optimal non-turbine route for fallbacks in late fall after the sluiceway is typically closed for juvenile fish passage and for overwintering summer steelhead andmore » kelt passage in the early spring before the start of the voluntary spill season. The goal of this study was to characterize adult steelhead spatial and temporal distributions and passage rates at the sluiceway and turbines, and their movements in front of the sluiceway at TDA to inform fisheries managers’ and engineers’ decision-making relative to sluiceway operations. The study periods were from November 1 to December 15, 2008 (45 days) and from March 1 to April 9, 2009 (40 days). The study objectives were to 1) estimate the number and distribution of overwintering summer steelhead fallbacks and kelt-sized acoustic targets passing into the sluiceway and turbines at TDA during the two study periods, respectively, and 2) assess the behavior of these fish in front of sluice entrances. We obtained fish passage data using fixed-location hydroacoustics and fish behavior data using acoustic imaging. For the overwintering summer steelhead, fallback occurred throughout the 45-day study period. We estimated that a total of 1790 ± 250 (95% confidence interval) summer steelhead targets passed through the powerhouse intakes and operating sluices during November 1 to December 15, 2008. Ninety five percent of these fish passed through the sluiceway. Therefore, without the sluiceway as a route through the dam, a number of steelhead may have fallen back through turbines. Run timing peaked in late November, but fish continued to pass the dam until the end of the study. Horizontal distribution data indicated that sluice 1 is the preferred route for these fish during fallback through the dam. Diel distribution for overwintering steelhead fallbacks was variable with no apparent distinct patterns. Therefore, sluiceway operations should not be based on diel distribution. For the early spring study, overwintering summer steelhead and early out-migrating steelhead kelt downstream passage occurred throughout the 40-day study period. A total of 1766 ± 277 (95% confidence interval) kelt-size targets were estimated to have passed through the powerhouse intakes and operating sluices. Ninety five percent of these fish passed through the sluiceway. Therefore, as with steelhead fallback, not having the sluiceway as a route through the dam, a number of overwintering steelhead and kelts may use the turbines for downstream passage before the start of the spill season. Run timing peaked in late March; however, relatively large numbers of kelt-sized targets passed the dam on March 2 and March 6 (162 and 188 fish, respectively). Horizontal distribution indicated that sluice 1 is the preferred route for these adult salmonids as they migrate downstream through the dam. Again, no clear pattern was seen for diel distribution of overwintering steelhead and early out-migrating kelt passage.« less

  1. 5 CFR 532.269 - Special wage schedules for Corps of Engineers, U.S. Army navigation lock and dam employees.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Engineers, U.S. Army navigation lock and dam employees. 532.269 Section 532.269 Administrative Personnel... Determinations § 532.269 Special wage schedules for Corps of Engineers, U.S. Army navigation lock and dam... and dam equipment or who repair and maintain navigation lock and dam operating machinery and equipment...

  2. Behavior and dam passage of juvenile Chinook salmon and juvenile steelhead at Detroit Reservoir and Dam, Oregon, March 2012-February 2013

    USGS Publications Warehouse

    Beeman, John W.; Hansel, Hal C.; Hansen, Amy C.; Evans, Scott D.; Haner, Philip V.; Hatton, Tyson W.; Kofoot, Eric E.; Sprando, Jamie M.; Smith, Collin D.

    2014-01-01

    The in-reservoir movements and dam passage of individual juvenile Chinook salmon (Oncorhynchus tshawytscha) and juvenile steelhead (Oncorhynchus mykiss) were studied at Detroit Reservoir and Dam, near Detroit, Oregon, during 2012 and 2013. The goal of the study was to provide data to inform decisions about future downstream passage alternatives and factors affecting downstream passage rates with the existing dam configuration. In 2012, 468 juvenile Chinook salmon and 200 juvenile steelhead were tagged and released during a 3-month period in the spring, and another 514 juvenile Chinook salmon were tagged and released during a 3-month period in the fall. The fish were surgically implanted with a small acoustic transmitter with an expected life of about 3 months and a passive integrated transponder tag with an indefinite life, and were released into the two main tributaries several kilometers upstream of the reservoir. Juvenile Chinook salmon migrated from the release sites to the reservoir in a greater proportion than juvenile steelhead, but once in the reservoir, juvenile steelhead migrated to the forebay faster and had a higher dam passage rate than juvenile Chinook salmon. The routes available for passing water and fish varied throughout the year, with low reservoir elevations in winter and high reservoir elevations in summer in accordance with the flood-control purpose of the dam. Most dam passage was through the spillway during the spring and summer, when the reservoir elevation was high and the spillway and powerhouse were the most common routes in operation, and via the powerhouse during the fall and winter period, when the reservoir elevation was low and the regulating outlet and powerhouse were the most common routes in operation. Few tagged fish passed when the powerhouse was the only route in operation. Dam passage rates during the spring and summer were greatest at night, increased with dam discharge, and were greater when water was passed freely over the spillway compared to when it was controlled by the spillway Tainter gates. Dam passage rates during the fall and winter, when the reservoir elevation usually was too low for spillway operation, were lower than during the spring and summer, negatively related to reservoir elevation, and positively related to dam discharge, though the latter relation diminished as reservoir elevation decreased. Fish locations near the dam from estimates of three-dimensional positions often were near the locations of dam discharge and fish depths were surface oriented relative to the depth of the forebay. Fish passage rates with the existing dam configuration were greatest when the spillway was in operation and were lowest when the powerhouse was the only route in operation; the latter result may be related to the relatively low magnitude or variability in discharge during that condition. The available data suggest that a properly designed surface outlet could be a viable passage route for juvenile Chinook salmon and juvenile steelhead at Detroit Dam. A second year of data collection based on a similar study design was complete at the time of this report.

  3. National Dam Safety Program. Grindstone-Lost-Muddy Creek Dam F-20 (MO 11220), Grand - Chariton Basin, Daviess County, Missouri. Phase I Inspection Report.

    DTIC Science & Technology

    1980-06-01

    for a small dam having a high hazard potential. Considering the small volume of water im- pounded and the downstream channel from the dam, one-half of...flood at damsite - Mr. Wesley Lee reported that the highest water he had seen was approximately 4 inches over the riser. (3) The principal spillway...operation. It was reported by Mr. Wesley Lee that the emergency spillway has never operated. 2.4 EVALUATION a. Availabilit X . The data in Appendix C

  4. Osage River Basin, Osage River, Missouri, Harry S. Trumman Dam & Reservoir. Multiple-Purpose Project. Operation and Maintenance Manual. Appendix 7, Volume 2. Construction Foundation Report.

    DTIC Science & Technology

    1984-01-01

    PROJECT S TYPE OF REPORT & PERIOD COVEREDOSAGE RIVER BASIN ConStruction Foundation OSAGE RIVER MISSOURI Report from September 1966 HARRY S. TRUMAN DAM...OPERATION AND MAINTENANCE MANUAL HARRY S. TRUMAN DAM AND RESERVOIR OSAGE RIVER, MISSOURI APPENDIX VII CONSTRUCTION FOUNDATION REPORT VOLUME II TABLE OF...09r IWNI’(ANSAS CITY M?5OU ....... 11 1 O IA R, MISSOURI HARRY S TRUMA DAM & 1K5(V01 = CONSTRUCT"ON FOUNDATION REPORT IGEOLOGIC UNIT DESCRIPTIONS

  5. Modelling the impact of large dams on flows and hydropower production of the Sekong, Sesan and Srepok Rivers in the Mekong Basin

    NASA Astrophysics Data System (ADS)

    Piman, T.; Cochrane, T. A.; Arias, M. E.

    2013-12-01

    Water flow patterns in the Mekong River and its tributaries are changing due to water resources development, particularly as a result of on-going rapid hydropower development of tributaries for economic growth. Local communities and international observers are concerned that alterations of natural flow patterns will have great impacts on biodiversity, ecosystem services, food securing and livelihood in the basin. There is also concern that un-coordinated dam development will have an adverse impact on energy production potential of individual hydropower plants. Of immediate concern is the proposed hydropower development in the transboundary Srepok, Sesan and Srekong (3S) Basin, which contributes up to 20% of the Mekong's annual flows, has a large potential for energy production, and provides critical ecosystem services to local people and the downstream Tonle Sap Lake and the Mekong delta. To assess the magnitude of potential changes in flows and hydropower production, daily flows were simulated over 20 years (1986-2005) using the SWAT and HEC ResSim models for a range of dam development and operations scenarios. Simulations of all current and proposed hydropower development in the 3S basin (41 dams) using an operation scheme to maximize electricity production will increase average dry seasonal flows by 88.1% while average wet seasonal flows decrease by 24.7% when compared to the baseline (no dams) scenario, About 55% of dry season flows changes are caused by the seven largest proposed dams (Lower Srepok 3, Lower Srepok4, Lower Sesan 3, Lower Sesan and Srepok 2, Xekong 5, Xekong 4, and Xe Xou). The total active storage of the existing and ongoing hydropower projects is only 6,616 million m3 while the cumulative active storage of the seven large proposed dams is 17,679 million m3. The Lower Srepok 3 project causes the highest impact on seasonal flow changes. Average energy production of the existing and ongoing hydropower projects is 73.2 GWh/day. Additional benefits from energy production of the seven large proposed dams (33.0 GWh/day) are less than half compared to the cumulative benefits of the exiting and ongoing projects. In total, potential energy production of all dams is 129.1 GWh/day. Cascade dam simulations, under an independent operation regime, result in high electricity production of downstream dams, particularly of small storage dams. Hourly flow alterations, however, can be significant due to intra daily reservoir operations and warrant further study as well as impact of climate change on flows and hydropower operation. Strategic site selection and coordinated reservoir operations between countries and dam operators are necessary to achieve an acceptable level of energy production in the basin and mitigate negative impacts to seasonal flow patterns which sustain downstream ecosystem productivity and livelihoods.

  6. [Effects of cascading hydropower dams operation on the structure and distribution pattern of benthic macroinvertebrate assemblages in Manwan Reservoir, Southwest China].

    PubMed

    Li, Jin Peng; Dong, Shi Kui; Peng, Ming Chun; Wu, Xuan; Zhou, Fang; Yu, Yin

    2017-12-01

    Benthic macroinvertebrate assemblages are one of the biological groups in aquatic ecosystem most sensitive to the habitat change and degradation, and can be a biological indicator for the aquatic ecosystem change and succession in cascading hydropower dam reservoir. The middle and lower reaches of the Lancang River are key spot for international biodiversity conservation and ecological studies on the effects of cascading hydropower dam exploitation. In this study, the reservoir of Manwan hydropower dam, the first dam in Lancang-Mekong river main stream, was selected as the study site. The benthic macroinvertebrate assemblages were sampled in 2011 and 2016 respectively. Meanwhile, the survey data before impounding (natural river, 1996) and early stage of single dam (1997) were collected to conduct the overall analysis for structure, distribution pattern and evolution of benthic macroinvertebrate assemblages. The results showed that the dominant biological group was gradually changed from the Oligochaeta and Insecta to the Mollusca. Along the longitudinal gradient, the density and biomass of the benthic macroinvertebrate assemblages were remarkably increased in reservoir, especially in the lacustrine zone. As for the functional feeding group, the predator and gatherer-collector changed into filter-collector predominantly in lacustrine zone. With the cascading dams operation, the biotic index indicated that the water quality of reservoir in 2016 was better than in 2011. The evolution of benthic macroinvertebrate assemblages in the Manwan Reservoir was related to the operation of Xiaowan dam in the upper reach, the hydrological regime and siltation in the reservoir, and would continue with dynamic changes with the operation of the cascading hydropower dam.

  7. Inflow forecasting model construction with stochastic time series for coordinated dam operation

    NASA Astrophysics Data System (ADS)

    Kim, T.; Jung, Y.; Kim, H.; Heo, J. H.

    2014-12-01

    Dam inflow forecasting is one of the most important tasks in dam operation for an effective water resources management and control. In general, dam inflow forecasting with stochastic time series model is possible to apply when the data is stationary because most of stochastic process based on stationarity. However, recent hydrological data cannot be satisfied the stationarity anymore because of climate change. Therefore a stochastic time series model, which can consider seasonality and trend in the data series, named SARIMAX(Seasonal Autoregressive Integrated Average with eXternal variable) model were constructed in this study. This SARIMAX model could increase the performance of stochastic time series model by considering the nonstationarity components and external variable such as precipitation. For application, the models were constructed for four coordinated dams on Han river in South Korea with monthly time series data. As a result, the models of each dam have similar performance and it would be possible to use the model for coordinated dam operation.Acknowledgement This research was supported by a grant 'Establishing Active Disaster Management System of Flood Control Structures by using 3D BIM Technique' [NEMA-NH-12-57] from the Natural Hazard Mitigation Research Group, National Emergency Management Agency of Korea.

  8. Large dams and alluvial rivers in the Anthropocene: The impacts of the Garrison and Oahe Dams on the Upper Missouri River

    USGS Publications Warehouse

    Skalak, Katherine; Benthem, Adam J.; Schenk, Edward R.; Hupp, Cliff R.; Galloway, Joel M.; Nustad, Rochelle A.; Wiche, Gregg J.

    2013-01-01

    The Missouri River has had a long history of anthropogenic modification with considerable impacts on river and riparian ecology, form, and function. During the 20th century, several large dam-building efforts in the basin served the needs for irrigation, flood control, navigation, and the generation of hydroelectric power. The managed flow provided a range of uses, including recreation, fisheries, and habitat. Fifteen dams impound the main stem of the river, with hundreds more on tributaries. Though the effects of dams and reservoirs are well-documented, their impacts have been studied individually, with relatively little attention paid to their interaction along a river corridor. We examine the morphological and sedimentological changes in the Upper Missouri River between the Garrison Dam in ND (operational in 1953) and Oahe Dam in SD (operational in 1959). Through historical aerial photography, stream gage data, and cross sectional surveys, we demonstrate that the influence of the upstream dam is still a major control of river dynamics when the backwater effects of the downstream reservoir begin. In the “Anthropocene”, dams are ubiquitous on large rivers and often occur in series, similar to the Garrison Dam Segment. We propose a conceptual model of how interacting dams might affect river geomorphology, resulting in distinct and recognizable morphologic sequences that we term “Inter-Dam sequence” characteristic of major rivers in the US.

  9. Approach, passage, and survival of juvenile salmonids at Little Goose Dam, Washington: Post-construction evaluation of a temporary spillway weir, 2009

    USGS Publications Warehouse

    Beeman, J.W.; Braatz, A.C.; Hansel, H.C.; Fielding, S.D.; Haner, P.V.; Hansen, G.S.; Shurtleff, D.J.; Sprando, J.M.; Rondorf, D.W.

    2010-01-01

    This report describes a study of dam passage and survival of radio-tagged juvenile salmonids after installation of a temporary spillway weir (TSW) at Little Goose Dam, Washington, in 2009. The purpose of the study was to document fish passage and survival when the dam was operated with the TSW in place. Spillway weirs are one of several methods used to improve downstream passage of juvenile salmonids. Each spillway weir design is based on the concept of providing an overflow weir with a depth more similar to the natural migration depth of juvenile salmonids than conventional spill bays. Little Goose Dam was the last of the four lower Snake River dams to have a spillway weir installed. This was the first year that some form of surface passage device was operating at all Snake River and Columbia River dams between Lewiston, Idaho, and the Columbia River estuary. The study design stipulated that a total of 30 percent of the river discharge would continuously be passed over the TSW and the conventional spill bays, and this percentage was achieved. The TSW also was to be operated at the 'low crest' elevation during the spring and the 'high crest' elevation during the summer, but the TSW was only operated at the low crest elevation during this study. Behavior, passage, and survival of spring and summer juvenile salmonid migrants passing through Little Goose Dam were examined using radio telemetry. Survival was estimated using the Route Specific Survival Model (RSSM) by releasing tagged fish near Central Ferry State Park 21 kilometers upstream of the dam and in the tailrace approximately 0.5 kilometer downstream of the dam. From April 18 to May 21, 2009, 1,520 yearling Chinook salmon (Oncorhynchus tshawytscha) and 1,517 juvenile steelhead (O. mykiss) were radio tagged and released. From June 6 to July 5, 2009, 4,251 subyearling Chinook salmon (O. tshawytscha) were radio tagged and released. Release dates of subyearling Chinook salmon were selected to avoid 'reservoir-type' fish that cease to migrate around July. Detection sites were installed in the forebay 2 kilometers upstream of the dam, on the dam, and at several sites downstream. Detection equipment was operated from April 18 to June 5, 2009, and from June 6 to July 6, 2009, hereinafter referred to as the study periods. We describe passage behaviors through the forebay, main passage routes, and tailrace, survival probabilities through the pool (release to the forebay) and forebay and passage and survival probabilities through the main passage routes (TSW, conventional spill bays, turbines, juvenile bypass), and survival passing the concrete (the dam itself) and the dam (concrete plus the forebay).

  10. Sensitivity of Water-Energy Nexus to dam operation: A Water-Energy Productivity concept.

    PubMed

    Basheer, Mohammed; Elagib, Nadir Ahmed

    2018-03-01

    Understanding and modelling the complex nature of interlinkages between water and energy are essential for efficient use of the two resources. Hydropower storage dams represent an interesting example of the water-energy interdependencies since they are often multipurpose. The concept of Water-Energy Productivity (WEP), defined as the amount of energy produced per unit of water lost in the process, is introduced in this study to illustrate the relationship between energy generation and water losses by examining the sensitivity of the Water-Energy Nexus (WEN) to changing dam operation policy. This concept is demonstrated by developing a water allocation model of the White Nile in Sudan, including Jebel Aulia Dam (JAD), using a general river and reservoir simulation software called RiverWare. A number of 77 operation scenarios of JAD are examined for 30 hydrologic years (1980-2009), considering reducing the Full Supply Level (FSL) gradually from its current value to the minimum possible value, increasing the Minimum Operating Level (MOL) gradually to the maximum possible level, and operating the dam at a Constant Operating Level (COL). The results show that raising the operating level does not necessarily increase the WEP. In comparison to the current policy, the analysis shows that a maximum WEP of 32.6GWh/BCM (GWh/Billion Cubic Meters) would be reached by raising the MOL to 375masl (meters above sea level), resulting in an increase in average annual energy generation to 164.6GWh (+18.1%) at the expense of an annual water loss of 5.05BCM (+12.7%). Even though this operation policy results in a more efficient water use compared to the original operation policy, a basin-wide assessment that includes all hydropower storage dams in the Nile basin should be conducted to decide on where and how much energy should be generated. The present analysis and future examination of the multi-dimensions of the WEN in the context of dam operation are imperative to improve the decision making in the quest for efficient resource use and management. Copyright © 2017 Elsevier B.V. All rights reserved.

  11. 30 CFR 717.18 - Dams constructed of or impounding waste material.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... shall design, locate, construct, operate, maintain, modify, and abandon or remove all dams (used either... design. (ix) A permanent identification marker, at least 6 feet high that shows the dam number assigned... located on or immediately adjacent to each dam within 30 days of certification of design pursuant to this...

  12. 33 CFR 208.28 - Foss Dam and Reservoir, Washita River, Oklahoma.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Foss Dam and Reservoir, Washita... THE ARMY, DEPARTMENT OF DEFENSE FLOOD CONTROL REGULATIONS § 208.28 Foss Dam and Reservoir, Washita River, Oklahoma. The Bureau of Reclamation shall operate the Foss Dam and Reservoir in the interest of...

  13. 33 CFR 208.82 - Hetch Hetchy, Cherry Valley, and Don Pedro Dams and Reservoirs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Don Pedro Dams and Reservoirs. 208.82 Section 208.82 Navigation and Navigable Waters CORPS OF..., Cherry Valley, and Don Pedro Dams and Reservoirs. The Turlock Irrigation District and Modesto Irrigation District, acting jointly, hereinafter called the Districts, shall operate Don Pedro Dam and Reservoir in...

  14. 33 CFR 208.82 - Hetch Hetchy, Cherry Valley, and Don Pedro Dams and Reservoirs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Don Pedro Dams and Reservoirs. 208.82 Section 208.82 Navigation and Navigable Waters CORPS OF..., Cherry Valley, and Don Pedro Dams and Reservoirs. The Turlock Irrigation District and Modesto Irrigation District, acting jointly, hereinafter called the Districts, shall operate Don Pedro Dam and Reservoir in...

  15. 33 CFR 208.28 - Foss Dam and Reservoir, Washita River, Oklahoma.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Foss Dam and Reservoir, Washita... THE ARMY, DEPARTMENT OF DEFENSE FLOOD CONTROL REGULATIONS § 208.28 Foss Dam and Reservoir, Washita River, Oklahoma. The Bureau of Reclamation shall operate the Foss Dam and Reservoir in the interest of...

  16. National Program for Inspection of Non-Federal Dams. Farm Brook Site 2A Dam (CT 01546), Connecticut Coastal Basin, Hamden, Connecticut. Phase I Inspection Report.

    DTIC Science & Technology

    1981-09-01

    01546 NAME OF DAM: Farm Brook Site 2A Darn TO4N: Hamden COUNTY AND STATE: New Haven County, Connecticut STREAM: Wilmot Brook *DATE OF INSPECTION...few lives. Therefore, an emergency operation plan, including a downstream warning system should be prepared and implemented. It is recommended that...3.2 Evaluation 3-4 4. OPERATIONAL & MAINTENANCE PROCEDURES - 4.1 Operational Procedures 4-1 a. General b. Description of any Warning System in Effect

  17. National Program for Inspection of Non-Federal Dams. Keyser Dam (VT 00097), Connecticut River Basin, Chelsea, Vermont. Phase I Inspection Report.

    DTIC Science & Technology

    1980-04-01

    CARNEY M. TERZIAN, HENBER I Design Branch Engineering Division RICHARD DIB * Water Control Branch Engineering Division [ hPIPWVAL 220ininu: Chief...2 f. Operator 2 I g. Purpose of Dam 2 h. Design and Construction History 2 i. Normal Operational Procedure 2 1.3 Pertinent Data 2 a. Drainage...i. Spillway 5 J. Regulating Outlets 5 [I h] Section Page 2. ENGINEERING DATA 6 2.1 Design Data 6 2.2 Construction Data 6 2.3 Operation Data 6 2.4

  18. 77 FR 51993 - Western Technical College; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... hydroelectric generation at the dam. The dam is operated manually in a run-of-river mode (i.e., an operating...) distribution line; and (5) appurtenant facilities. The project would be operated in a run-of-river mode using... could otherwise enter project waters or adjacent non-project lands; Operating the project in a run-of...

  19. National Program for Inspection of Non-Federal Dams. Ludlow Dam (MA 00547) and Cherry Valley Dam (MA 00548), Chicopee River Basin, Ludlow, Massachusetts. Phase I Inspection Report.

    DTIC Science & Technology

    1978-08-01

    operates to pump water from Settling Basin to Filter * Float Wells Beds above the location of Ludlow Dam. Crane Hoist Elevator Hydraulic Systum Service...outlet Channel beyond Emergency Spillway at Cherry Valley Dam Overflow StutueoBra ro aa atryVe Photogaph #1 P 0 Photograph #12 Contrls forw Slif Gaes ate

  20. Modeling Shasta Dam operations to regulate temperatures for Chinook salmon under extreme climate and climate change

    NASA Astrophysics Data System (ADS)

    Dai, A.; Saito, L.; Sapin, J. R.; Rajagopalan, B.; Hanna, R. B.; Kauneckis, D. L.

    2014-12-01

    Chinook salmon populations have declined significantly after the construction of Shasta Dam on the Sacramento River in 1945 prevented them from spawning in the cold waters upstream. In 1994, the winter-run Chinook were listed under the Endangered Species Act and 3 years later the US Bureau of Reclamation began operating a temperature control device (TCD) on the dam that allows for selective withdrawal for downstream temperature control to promote salmon spawning while also maximizing power generation. However, dam operators are responsible to other interests that depend on the reservoir for water such as agriculture, municipalities, industry, and recreation. An increase in temperatures due to climate change may place additional strain on the ability of dam operations to maintain spawning habitat for salmon downstream of the dam. We examined the capability of Shasta Dam to regulate downstream temperatures under extreme climates and climate change by using stochastically generated streamflow, stream temperature, and weather inputs with a two-dimensional CE-QUAL-W2 model under several operational options. Operation performance was evaluated using degree days and cold pool volume (volume of water below a temperature threshold). Model results indicated that a generalized operations release schedule, in which release elevations varied over the year to match downstream temperature targets, performed best overall in meeting temperature targets while preserving cold pool volume. Releasing all water out the bottom throughout the year tended to meet temperature targets at the expense of depleting the cold pool, and releasing all water out uppermost gates preserved the cold pool, but released water that was too warm during the critical spawning period. With higher air temperatures due to climate change, both degree day and cold pool volume metrics were worse than baseline conditions, which suggests that Chinook salmon may be more negatively affected under climate change.

  1. An R package for the design, analysis and operation of reservoir systems

    NASA Astrophysics Data System (ADS)

    Turner, Sean; Ng, Jia Yi; Galelli, Stefano

    2016-04-01

    We present a new R package - named "reservoir" - which has been designed for rapid and easy routing of runoff through storage. The package comprises well-established tools for capacity design (e.g., the sequent peak algorithm), performance analysis (storage-yield-reliability and reliability-resilience-vulnerability analysis) and release policy optimization (Stochastic Dynamic Programming). Operating rules can be optimized for water supply, flood control and amenity objectives, as well as for maximum hydropower production. Storage-depth-area relationships are in-built, allowing users to incorporate evaporation from the reservoir surface. We demonstrate the capabilities of the software for global studies using thousands of reservoirs from the Global Reservoir and Dam (GRanD) database fed by historical monthly inflow time series from a 0.5 degree gridded global runoff dataset. The package is freely available through the Comprehensive R Archive Network (CRAN).

  2. Hydroacoustic Evaluation of Overwintering Summer Steelhead Fallback and Kelt Passage at The Dalles Dam Turbines, Early Spring 2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Khan, Fenton; Royer, Ida M.

    2012-02-01

    This report presents the results of an evaluation of overwintering summer steelhead (Oncorhynchus mykiss) fallback and early out-migrating steelhead kelts downstream passage at The Dalles Dam turbines during early spring 2011. The study was conducted by Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers, Portland District (USACE) to investigate whether adult steelhead are passing through turbines during early spring before annual sluiceway operations typically begin. The sluiceway surface flow outlet is the optimal non-turbine route for adult steelhead, although operating the sluiceway reduces hydropower production. This is a follow-up study to similar studies of adult steelheadmore » passage at the sluiceway and turbines we conducted in the fall/winter 2008, early spring 2009, fall/winter 2009, and early spring 2010. The goal of the 2011 study was to characterize adult steelhead passage rates at the turbines while the sluiceway was closed so fisheries managers would have additional information to use in decision-making relative to sluiceway operations. Sluiceway operations were not scheduled to begin until April 10, 2011. However, based on a management decision in late February, sluiceway operations commenced on March 1, 2011. Therefore, this study provided estimates of fish passage rates through the turbines, and not the sluiceway, while the sluiceway was open. The study period was March 1 through April 10, 2011 (41 days total). The study objective was to estimate the number and distribution of adult steelhead and kelt-sized targets passing into turbine units. We obtained fish passage data using fixed-location hydroacoustics with transducers deployed at all 22 main turbine units at The Dalles Dam. Adult steelhead passage through the turbines occurred on 9 days during the study (March 9, 12, 30, and 31 and April 2, 3, 5, 7, and 9). We estimated a total of 215 {+-} 98 (95% confidence interval) adult steelhead targets passed through the turbines between March 1 and April 10, 2011. Horizontal distribution data indicated Main Unit 18 passed the majority of fish. Fish passage occurred throughout the day. We conclude that adult steelhead passed through turbines during early spring 2011 at The Dalles Dam.« less

  3. 43 CFR 418.23 - Diversion of Rock Dam Ditch water.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Diversion of Rock Dam Ditch water. 418.23... Operations and Management § 418.23 Diversion of Rock Dam Ditch water. Project water may be diverted directly to Rock Dam Ditch from the Truckee Canal only when diversions cannot be made from the outlet works of...

  4. 43 CFR 418.23 - Diversion of Rock Dam Ditch water.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Diversion of Rock Dam Ditch water. 418.23... Operations and Management § 418.23 Diversion of Rock Dam Ditch water. Project water may be diverted directly to Rock Dam Ditch from the Truckee Canal only when diversions cannot be made from the outlet works of...

  5. 43 CFR 418.23 - Diversion of Rock Dam Ditch water.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Diversion of Rock Dam Ditch water. 418.23... Operations and Management § 418.23 Diversion of Rock Dam Ditch water. Project water may be diverted directly to Rock Dam Ditch from the Truckee Canal only when diversions cannot be made from the outlet works of...

  6. 76 FR 57731 - Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... Competing Applications; Kachess Dam Hydropower, LLC On May 31, 2011, Kachess Dam Hydropower, LLC filed an... study the feasibility of the Kachess Dam Hydroelectric Project (project) to be located at Kachess Reservoir dam, owned and operated by the U.S. Bureau of Reclamation near Cle Elum and Roslyn in Kittitas...

  7. PREDICTION OF TOTAL DISSOLVED GAS EXCHANGE AT HYDROPOWER DAMS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hadjerioua, Boualem; Pasha, MD Fayzul K; Stewart, Kevin M

    2012-07-01

    Total dissolved gas (TDG) supersaturation in waters released at hydropower dams can cause gas bubble trauma in fisheries resulting in physical injuries and eyeball protrusion that can lead to mortality. Elevated TDG pressures in hydropower releases are generally caused by the entrainment of air in spillway releases and the subsequent exchange of atmospheric gasses into solution during passage through the stilling basin. The network of dams throughout the Columbia River Basin (CRB) are managed for irrigation, hydropower production, flood control, navigation, and fish passage that frequently result in both voluntary and involuntary spillway releases. These dam operations are constrained bymore » state and federal water quality standards for TDG saturation which balance the benefits of spillway operations designed for Endangered Species Act (ESA)-listed fisheries versus the degradation to water quality as defined by TDG saturation. In the 1970s, the United States Environmental Protection Agency (USEPA), under the federal Clean Water Act (Section 303(d)), established a criterion not to exceed the TDG saturation level of 110% in order to protect freshwater and marine aquatic life. The states of Washington and Oregon have adopted special water quality standards for TDG saturation in the tailrace and forebays of hydropower facilities on the Columbia and Snake Rivers where spillway operations support fish passage objectives. The physical processes that affect TDG exchange at hydropower facilities have been studied throughout the CRB in site-specific studies and routine water quality monitoring programs. These data have been used to quantify the relationship between project operations, structural properties, and TDG exchange. These data have also been used to develop predictive models of TDG exchange to support real-time TDG management decisions. These empirically based predictive models have been developed for specific projects and account for both the fate of spillway and powerhouse flows in the tailrace channel and resultant exchange in route to the next downstream dam. Currently, there exists a need to summarize the general finding from operational and structural TDG abatement programs conducted throughout the CRB and for the development of a generalized prediction model that pools data collected at multiple projects with similar structural attributes. A generalized TDG exchange model can be tuned to specific projects and coupled with water regulation models to allow the formulation of optimal daily water regulation schedules subject to water quality constraints for TDG supersaturation. A generalized TDG exchange model can also be applied to other hydropower dams that affect TDG pressures in tailraces and can be used to develop alternative operational and structural measures to minimize TDG generation. It is proposed to develop a methodology for predicting TDG levels downstream of hydropower facilities with similar structural properties as a function of a set of variables that affect TDG exchange; such as tailwater depth, spill discharge and pattern, project head, and entrainment of powerhouse releases. TDG data from hydropower facilities located throughout the northwest region of the United States will be used to identify relationships between TDG exchange and relevant dependent variables. Data analysis and regression techniques will be used to develop predictive TDG exchange expressions for various structural categories.« less

  8. Balancing Energy, Food Security, and Critical Ecosystems: Dam Siting, Design and Operations in the Mekong River Basin

    NASA Astrophysics Data System (ADS)

    Wild, T. B.; Reed, P. M.; Loucks, D.

    2016-12-01

    The Mekong River basin in Southeast Asia is one of several river basins with exceptionally high biodiversity value where intensive hydropower dam development is anticipated. In the Mekong basin, over 100 dams are planned to be constructed in the next 20-30 years. As planned, these dams will alter the river's natural water, sediment and nutrient flows, and will fragment fish migration pathways. In doing so, they will degrade one of the world's most productive freshwater fish habitats, upon which some 60 million people depend for food and income security. For those dams that have not yet been constructed, there still exist opportunities to modify their siting, design and operation (SDO) to achieve a more balanced set of tradeoffs among hydropower production, sediment/nutrient passage and adult fish/larvae passage. We present a successful case study wherein we explored such alternative SDO opportunities in partnership with the Government of Cambodia for Sambor Dam, planned to be built on the main stem of the Mekong. Sambor would be one of the world's longest dams, spanning 18 km across the river just upstream of (1) Tonle Sap Lake, which supplies 70% of Cambodians' protein, and (2) the Mekong Delta in Vietnam, responsible for 50% of Vietnam's rice production. We will describe key dam siting and design modifications required to mitigate ecological impacts. We will then focus on the most promising alternative dam siting/design concept, exploring the reservoir operations space to demonstrate that a complex set of tradeoffs exist among a diverse set of energy and ecosystem objectives. Results indicate that even for a hydrologically small reservoir, a wide array of potential reservoir operating policies exist that have vastly different food-energy implications. While some policies would significantly mitigate ecological impacts, many policies exist that would pose a severe threat to the sustainability of the fishery. Failure to sample the reservoir operations space at appropriate resolution could result in failure to accurately identify tradeoffs and vulnerabilities. We explore energy-ecosystem tradeoffs while demonstrating to stakeholders the impacts of transitioning from their initial deterministic analysis that largely focused on energy revenue to broader many-objective stochastic problem formulations.

  9. Simulations of a hypothetical temperature control structure at Detroit Dam on the North Santiam River, northwestern Oregon

    USGS Publications Warehouse

    Buccola, Norman L.; Stonewall, Adam J.; Rounds, Stewart A.

    2015-01-01

    Estimated egg-emergence days for endangered Upper Willamette River Chinook salmon (Oncorhynchus tshawytscha) and Upper Willamette River winter steelhead (Oncorhynchus mykiss) were assessed for all scenarios. Estimated spring Chinook fry emergence under SlidingWeir scenarios was 9 days later immediately downstream of Big Cliff Dam, and 4 days later at Greens Bridge compared with existing structural scenarios at Detroit Dam. Despite the inclusion of a hypothetical sliding weir at Detroit Dam, temperatures exceeded without-dams temperatures during November and December. These late-autumn exceedances likely represent the residual thermal effect of Detroit Lake operated to meet minimum dry-season release rates (supporting instream habitat and irrigation requirements) and lake levels specified by the current (2014) operating rules (supporting recreation and flood mitigation).

  10. Effects of dam operation on the endangered Júcar nase, Parachondrostoma arrigonis, related to mesohabitats, microhabitat availability and water temperature regime, in the river Cabriel (Spain)

    NASA Astrophysics Data System (ADS)

    Martinez-Capel, Francisco; Costa, Rui; Muñoz-Mas, Rafael; Diego Alcaraz-Hernandez, Juan; Hernandez-Mascarell, Aina

    2010-05-01

    The presence of large dams affects habitat availability, often regarded as the primary factor that limits population and community recovery in rivers. Physical habitat is often targeted in restoration, but there is often a paucity of useful information. Habitat degradation has reduced the complexity and connectivity of the Mediterranean streams in Spain. These changes have diminished the historical range of the endangered Júcar nase, Parachondrostoma arrigonis (Steindachner, 1866), isolated the populations of this species, and probably contributed to its risk of extinction. In the Júcar River basin (Spain), where this fish is endemic, the populations are mainly restricted to the river Cabriel, which is fragmented in two segments by the large dam of Contreras. In this river, 3 main lines of research were developed from 2006 to 2008, i.e., microhabitat suitability, mesohabitat suitability, and water temperature, in order to relate such kind of variables with the flow regime. The main goal of the research project, funded by the Spanish Ministry of Environment, was to detect the main reasons of the species decline, and to propose dam operation improvements to contribute to the recovery of the species. The flow and water temperature regimes were also studied in the river Cabriel, upstream and downstream the large dam of Contreras. During the three years of study, below the dam it was observed a small and not significant variation in the proportions of slow and fast habitats; the regulated flow regime was pointed out as the main reason of such variations. At the microhabitat scale, optimal ranges for average depth and velocity were defined; these data allowed us to develop an estimation of weighted useable area under natural and regulated conditions. The Júcar nase were found majorly at depths no greater than 1,15 meters with slow water velocities. It was possible to observe a clear alteration of the flow and water temperature regime below the dam, due to the cold water release during the summer months (maximum discharge) for irrigation in the Valencian Region. The temperature effect was partially mitigated by the presence of natural springs. The results in these three lines of research supported the proposal of management actions, such as the implementation of an environmental flow regime, with anticipated releases more coincident with the natural flow regime, and previous to the fish migration for spawning, and therefore smaller discharges during the summer.

  11. Scenario-based and scenario-neutral assessment of climate change impacts on operational performance of a multipurpose reservoir

    Treesearch

    Allison G. Danner; Mohammad Safeeq; Gordon E. Grant; Charlotte Wickham; Desirée Tullos; Mary V. Santelmann

    2017-01-01

    Scenario-based and scenario-neutral impacts assessment approaches provide complementary information about how climate change-driven effects on streamflow may change the operational performance of multipurpose dams. Examining a case study of Cougar Dam in Oregon, United States, we simulated current reservoir operations under scenarios of plausible future hydrology....

  12. 77 FR 63299 - Notice of Intent To Prepare a Joint Environmental Impact Statement/Environmental Impact Report...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-16

    ... operation rules of Folsom Dam and Reservoir to reduce flood risk to the Sacramento area by utilizing the... the Dam's new flood operations plan, with the intention of meeting flood risk management objectives... direction to reduce Folsom Reservoir variable space allocation from the current operating range of 400,000...

  13. National Dam Safety Program. Lake Como Dam (DE 00028), Delaware River Basin, Mill Creek, Kent County, Delaware. Phase I Inspection Report.

    DTIC Science & Technology

    1980-11-01

    STATEMENT (of the abstract antarod in Block 20, It different frm Report) III. SUPPLEMENTARY NOTES Copies are obtainable from National Technical...should employ a professional engineer experienced in operation and maintanance of darns to develop written operating procedures and a periodic...100 YEAR FLOOD WOULD CAUSE A DAM TO bE OVERTOPPED THEREFORE THE OWNER SHOULD ENGAGE A QUALIFIED PkOFEbSIONAL CONSULTANT USING MORE PERCISE METHODS

  14. National Program for Inspection of Non-Federal Dams. Collins Company Upper Dam (CT 00674), Connecticut River Basin, Canton, Connecticut. Phase I Inspection Report.

    DTIC Science & Technology

    1979-07-01

    Engineering Division p 0 CAR WE H FRZIAN, NENBER Design Branch Engineering Division J SEPE FIN~EGAN, JR.,CIV ater Control Branch * Engineering Division...Operator g. Purpose of Dam h. Design and Construction History i. Normal Operational Procedures 1.3 PERTINENT DATA ........................... 4 a...Tunnel i. Spillways j. Regulating Outlets SECTION 2: ENGINEERING DATA 2.1 DESIGN .............................. 9 a. Available Data b. Design Features c

  15. Master Plan for Public Use Development and Resource Management, Lake Traverse, Minnesota - South Dakota.

    DTIC Science & Technology

    1979-05-01

    White Rock Dam Recreation Area 25 Reservation Highway Recreation Area 27 Brown’s Valley Dike Recreation Area 28 Potential Recreation Areas 28 Section...Development 35 White Rock Dam 35 Reservation Highway 39 Brown’s Valley Dike 39 Land Use Allocation 42 Project Operations ൲ Operations: Recreation--Intensive...Facilities 4 Proposed Facilities v i i u < *1 I_ • In I . .. PROJECT DAT ~PROJECT DATA LAKE TRAVERSE AND RESERVATION DAM Reservoir Flowage rights to

  16. National Dam Safety Program. Lake Sonoma Dam (NJ 0193), Passaic River Basin, Branch of Burnt Meadow Brook, Passaic County, New Jersey. Phase I Inspection Report.

    DTIC Science & Technology

    1980-03-01

    iron pipe through the dam approximately 42 feet right of the spillway. The flow through the pipe is controlled by a manually operated gate valve located...NATIONAL DAM SAFETY PROGRAM. LAKE SONOMA DAM (NJ 0193). PASSAIC-ETC(U) MAR 80 J P TALERICO DACW MI-T9-C-0011 UNCLASSIFIED NLmhhIEIIIEEEEEI...IIIIIIIIIIEEEE EIIIEEEEEIIEI IIIIEEEEEEEEEE PASS~AIC RIVER BASIN BRANCH OF BURNT MEADOW BROOK PASSAIC COUNTY, NEW JERSEY LA0 O0IM DAM NJi 00193 PHASE 1 INPCTO

  17. 19. WESTERLY VIEW ALONG SPILLWAY BUCKET, SHOWING CONSTRUCTION OPERATIONS IN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. WESTERLY VIEW ALONG SPILLWAY BUCKET, SHOWING CONSTRUCTION OPERATIONS IN PROGRESS. THE DAM EMBANKMENT IS SHOWN IN THE LEFT DISTANCE.... Volume XX, No. 6, September 5, 1940. - Prado Dam, Spillway, Santa Ana River near junction of State Highways 71 & 91, Corona, Riverside County, CA

  18. A multi-year analysis of passage and survival at McNary Dam, 2004-09

    USGS Publications Warehouse

    Adams, Noah S.; Walker, C.E.; Perry, R.W.

    2011-01-01

    We analyzed 6 years (2004–09) of passage and survival data collected at McNary Dam to determine how dam operations and environmental conditions affect passage and survival of juvenile salmonids. A multinomial logistic regression was used to examine how environmental variables and dam operations relate to passage behavior of juvenile salmonids at McNary Dam. We used the Cormack-Jolly-Seber release-recapture model to determine how the survival of juvenile salmonids passing through McNary Dam relates to environmental variables and dam operations. Total project discharge and the proportion of flow passing the spillway typically had a positive effect on survival for all species and routes. As the proportion of water through the spillway increased, the number of fish passing the spillway increased, as did overall survival. Additionally, survival generally was higher at night. There was no meaningful difference in survival for fish that passed through the north or south portions of the spillway or powerhouse. Similarly, there was no difference in survival for fish released in the north, middle, or south portions of the tailrace. For subyearling Chinook salmon migrating during the summer season, increased temperatures had a drastic effect on passage and survival. As temperature increased, survival of subyearling Chinook salmon decreased through all passage routes and the number of fish that passed through the turbines increased. During years when the temporary spillway weirs (TSWs) were installed, passage through the spillway increased for spring migrants. However, due to the changes made in the location of the TSW between years and the potential effect of other confounding environmental conditions, it is not certain if the increase in spillway passage was due solely to the presence of the TSWs. The TSWs appeared to improve forebay survival during years when they were operated.

  19. 33 CFR 117.705 - Beaver Dam Creek.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Beaver Dam Creek. 117.705 Section 117.705 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements New Jersey § 117.705 Beaver Dam Creek. The draw of the...

  20. 33 CFR 117.705 - Beaver Dam Creek.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Beaver Dam Creek. 117.705 Section 117.705 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements New Jersey § 117.705 Beaver Dam Creek. The draw of the...

  1. Influences of Dam Operations in Groundwater-Surface Water Mixing Zones: Towards Multiscale Understanding

    NASA Astrophysics Data System (ADS)

    Stegen, J.; Scheibe, T. D.; Chen, X.; Huang, M.; Arntzen, E.; Garayburu-Caruso, V. A.; Graham, E.; Johnson, T. C.; Strickland, C. E.

    2017-12-01

    The installation and operation of dams have myriad influences on ecosystems, from direct effects on hydrographs to indirect effects on marine biogeochemistry and terrestrial food webs. With > 50000 existing and > 3700 planned large dams world-wide there is a pressing need for holistic understanding of dam impacts. Such understanding is likely to reveal unrecognized opportunities to modify dam operations towards beneficial outcomes. One of the most dramatic influences of daily dam operations is the creation of `artificial intertidal zones' that emerge from short-term increases and decreases in discharge due to hydroelectric power demands; known as hydropeaking. There is a long history of studying the influences of hydropeaking on macrofauna such as fish and invertebrates, but only recently has significant attention been paid to the hydrobiogeochemical effects of hydropeaking. Our aim here is to develop an integrated conceptual model of the hydrobiogeochemical influences of hydropeaking. To do so we reviewed available literature focusing on hydrologic and/or biogeochemical influences of hydropeaking. Results from these studies were collated into a single conceptual model that integrates key physical (e.g., sediment transport, hydromorphology) and biological (e.g., timescale of microbiome response) processes. This conceptual model highlights non-intuitive impacts of hydropeaking, the presence of critical thresholds, and strong interactions among processes. When examined individually these features suggest context dependency, but when viewed through an integrated conceptual model, common themes emerge. We will further discuss a critical next step, which is the local to regional to global evaluation of this conceptual model, to enable multiscale understanding. We specifically propose a global `hydropeaking network' of researchers using common methods, data standards, and analysis techniques to quantify the hydrobiogeochemical effects of hydropeaking across biomes. We will conclude with a prospective discussion of key science questions that emerge from the conceptual model and that can only be answered through a global, synchronized effort. Such an effort has the potential to strongly influence dam operations towards improved health of river corridor ecosystems from local to global scales.

  2. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... determination by the Bureau, the Bureau may take over from the District the care, operation, maintenance, and management of the diversion and outlet works (Derby Dam and Lahontan Dam/Reservoir) or any or all of the.... Following written notification from the Bureau, the care, operation, and maintenance of the works may be...

  3. The impacts of wind power integration on sub-daily variation in river flows downstream of hydroelectric dams.

    PubMed

    Kern, Jordan D; Patino-Echeverri, Dalia; Characklis, Gregory W

    2014-08-19

    Due to their operational flexibility, hydroelectric dams are ideal candidates to compensate for the intermittency and unpredictability of wind energy production. However, more coordinated use of wind and hydropower resources may exacerbate the impacts dams have on downstream environmental flows, that is, the timing and magnitude of water flows needed to sustain river ecosystems. In this paper, we examine the effects of increased (i.e., 5%, 15%, and 25%) wind market penetration on prices for electricity and reserves, and assess the potential for altered price dynamics to disrupt reservoir release schedules at a hydroelectric dam and cause more variable and unpredictable hourly flow patterns (measured in terms of the Richards-Baker Flashiness (RBF) index). Results show that the greatest potential for wind energy to impact downstream flows occurs at high (∼25%) wind market penetration, when the dam sells more reserves in order to exploit spikes in real-time electricity prices caused by negative wind forecast errors. Nonetheless, compared to the initial impacts of dam construction (and the dam's subsequent operation as a peaking resource under baseline conditions) the marginal effects of any increased wind market penetration on downstream flows are found to be relatively minor.

  4. Dynamic decision making for dam-break emergency management - Part 2: Application to Tangjiashan landslide dam failure

    NASA Astrophysics Data System (ADS)

    Peng, M.; Zhang, L. M.

    2013-02-01

    Tangjiashan landslide dam, which was triggered by the Ms = 8.0 Wenchuan earthquake in 2008 in China, threatened 1.2 million people downstream of the dam. All people in Beichuan Town 3.5 km downstream of the dam and 197 thousand people in Mianyang City 85 km downstream of the dam were evacuated 10 days before the breaching of the dam. Making such an important decision under uncertainty was difficult. This paper applied a dynamic decision-making framework for dam-break emergency management (DYDEM) to help rational decision in the emergency management of the Tangjiashan landslide dam. Three stages are identified with different levels of hydrological, geological and social-economic information along the timeline of the landslide dam failure event. The probability of dam failure is taken as a time series. The dam breaching parameters are predicted with a set of empirical models in stage 1 when no soil property information is known, and a physical model in stages 2 and 3 when knowledge of soil properties has been obtained. The flood routing downstream of the dam in these three stages is analyzed to evaluate the population at risk (PAR). The flood consequences, including evacuation costs, flood damage and monetized loss of life, are evaluated as functions of warning time using a human risk analysis model based on Bayesian networks. Finally, dynamic decision analysis is conducted to find the optimal time to evacuate the population at risk with minimum total loss in each of these three stages.

  5. National Program for Inspection of Non-Federal Dams. Bird Pond Dam (MA 00804), Neponset River Basin, Walpole, Massachusetts. Phase I Inspection Report.

    DTIC Science & Technology

    1980-04-01

    generally fair condition because of the seepage through the left spillway training wall and because the low level outlet has not been operated in many...that a dam of this class which does not have sufficient spillway capacity to discharge fifty percent of the PKF , should be adjudged as having a...2,070 cfs or about 14 percent of the test flood outflow without overtopping the dam. The dam is judged to be in generally fair condition because of the

  6. National Program for Inspection of Non-Federal Dams. Pattaconk Reservoir Dam (CT 00398), Connecticut River Basin, Chester, Connecticut. Phase I inspection Report

    DTIC Science & Technology

    1979-03-01

    approximately 824 acre-feet of water with the reservoir level at the top of the dam, which is approximately 23 feet above the bed of Pattaconk Brook. According...Pattaconk Brook, from 2 to 4 feet above the water level. Should the dam breach, there is potential for loss of life at this downstream development. e...under the jurisdiction of the Water Resources Commission as af State Park in 1959. f. Operator - None. g. Purpose of the Dam - Recreational; Part of

  7. Enhancing ecosystem restoration efficiency through spatial and temporal coordination.

    PubMed

    Neeson, Thomas M; Ferris, Michael C; Diebel, Matthew W; Doran, Patrick J; O'Hanley, Jesse R; McIntyre, Peter B

    2015-05-12

    In many large ecosystems, conservation projects are selected by a diverse set of actors operating independently at spatial scales ranging from local to international. Although small-scale decision making can leverage local expert knowledge, it also may be an inefficient means of achieving large-scale objectives if piecemeal efforts are poorly coordinated. Here, we assess the value of coordinating efforts in both space and time to maximize the restoration of aquatic ecosystem connectivity. Habitat fragmentation is a leading driver of declining biodiversity and ecosystem services in rivers worldwide, and we simultaneously evaluate optimal barrier removal strategies for 661 tributary rivers of the Laurentian Great Lakes, which are fragmented by at least 6,692 dams and 232,068 road crossings. We find that coordinating barrier removals across the entire basin is nine times more efficient at reconnecting fish to headwater breeding grounds than optimizing independently for each watershed. Similarly, a one-time pulse of restoration investment is up to 10 times more efficient than annual allocations totaling the same amount. Despite widespread emphasis on dams as key barriers in river networks, improving road culvert passability is also essential for efficiently restoring connectivity to the Great Lakes. Our results highlight the dramatic economic and ecological advantages of coordinating efforts in both space and time during restoration of large ecosystems.

  8. Enhancing ecosystem restoration efficiency through spatial and temporal coordination

    PubMed Central

    Neeson, Thomas M.; Ferris, Michael C.; Diebel, Matthew W.; Doran, Patrick J.; O’Hanley, Jesse R.; McIntyre, Peter B.

    2015-01-01

    In many large ecosystems, conservation projects are selected by a diverse set of actors operating independently at spatial scales ranging from local to international. Although small-scale decision making can leverage local expert knowledge, it also may be an inefficient means of achieving large-scale objectives if piecemeal efforts are poorly coordinated. Here, we assess the value of coordinating efforts in both space and time to maximize the restoration of aquatic ecosystem connectivity. Habitat fragmentation is a leading driver of declining biodiversity and ecosystem services in rivers worldwide, and we simultaneously evaluate optimal barrier removal strategies for 661 tributary rivers of the Laurentian Great Lakes, which are fragmented by at least 6,692 dams and 232,068 road crossings. We find that coordinating barrier removals across the entire basin is nine times more efficient at reconnecting fish to headwater breeding grounds than optimizing independently for each watershed. Similarly, a one-time pulse of restoration investment is up to 10 times more efficient than annual allocations totaling the same amount. Despite widespread emphasis on dams as key barriers in river networks, improving road culvert passability is also essential for efficiently restoring connectivity to the Great Lakes. Our results highlight the dramatic economic and ecological advantages of coordinating efforts in both space and time during restoration of large ecosystems. PMID:25918378

  9. Reservoir operations under climate change: Storage capacity options to mitigate risk

    NASA Astrophysics Data System (ADS)

    Ehsani, Nima; Vörösmarty, Charles J.; Fekete, Balázs M.; Stakhiv, Eugene Z.

    2017-12-01

    Observed changes in precipitation patterns, rising surface temperature, increases in frequency and intensity of floods and droughts, widespread melting of ice, and reduced snow cover are some of the documented hydrologic changes associated with global climate change. Climate change is therefore expected to affect the water supply-demand balance in the Northeast United States and challenge existing water management strategies. The hydrological implications of future climate will affect the design capacity and operating characteristics of dams. The vulnerability of water resources systems to floods and droughts will increase, and the trade-offs between reservoir releases to maintain flood control storage, drought resilience, ecological flow, human water demand, and energy production should be reconsidered. We used a Neural Networks based General Reservoir Operation Scheme to estimate the implications of climate change for dams on a regional scale. This dynamic daily reservoir module automatically adapts to changes in climate and re-adjusts the operation of dams based on water storage level, timing, and magnitude of incoming flows. Our findings suggest that the importance of dams in providing water security in the region will increase. We create an indicator of the Effective Degree of Regulation (EDR) by dams on water resources and show that it is expected to increase, particularly during drier months of year, simply as a consequence of projected climate change. The results also indicate that increasing the size and number of dams, in addition to modifying their operations, may become necessary to offset the vulnerabilities of water resources systems to future climate uncertainties. This is the case even without considering the likely increase in future water demand, especially in the most densely populated regions of the Northeast.

  10. Optimal water resource allocation modelling in the Lowveld of Zimbabwe

    NASA Astrophysics Data System (ADS)

    Mhiribidi, Delight; Nobert, Joel; Gumindoga, Webster; Rwasoka, Donald T.

    2018-05-01

    The management and allocation of water from multi-reservoir systems is complex and thus requires dynamic modelling systems to achieve optimality. A multi-reservoir system in the Southern Lowveld of Zimbabwe is used for irrigation of sugarcane estates that produce sugar for both local and export consumption. The system is burdened with water allocation problems, made worse by decommissioning of dams. Thus the aim of this research was to develop an operating policy model for the Lowveld multi-reservoir system.The Mann Kendall Trend and Wilcoxon Signed-Rank tests were used to assess the variability of historic monthly rainfall and dam inflows for the period 1899-2015. The WEAP model was set up to evaluate the water allocation system of the catchment and come-up with a reference scenario for the 2015/2016 hydrologic year. Stochastic Dynamic Programming approach was used for optimisation of the multi-reservoirs releases.Results showed no significant trend in the rainfall but a significantly decreasing trend in inflows (p < 0.05). The water allocation model (WEAP) showed significant deficits ( ˜ 40 %) in irrigation water allocation in the reference scenario. The optimal rule curves for all the twelve months for each reservoir were obtained and considered to be a proper guideline for solving multi- reservoir management problems within the catchment. The rule curves are effective tools in guiding decision makers in the release of water without emptying the reservoirs but at the same time satisfying the demands based on the inflow, initial storage and end of month storage.

  11. Factors Affecting Route Selection and Survival of Steelhead Kelts at Snake River Dams in 2012 and 2013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harnish, Ryan A.; Colotelo, Alison HA; Li, Xinya

    2014-12-01

    In 2012 and 2013, Pacific Northwest National Laboratory conducted a study that summarized the passage proportions and route-specific survival rates of steelhead kelts that passed through Federal Columbia River Power System (FCRPS) dams. To accomplish this, a total of 811 steelhead kelts were tagged with Juvenile Salmon Acoustic Telemetry System (JSATS) transmitters. Acoustic receivers, both autonomous and cabled, were deployed throughout the FCRPS to monitor the downstream movements of tagged-kelts. Kelts were also tagged with Passive Integrated Transponder tags to monitor passage through juvenile bypass systems and detect returning fish. The current study evaluated data collected in 2012 and 2013more » to identify individual, behavioral, environmental and dam operation variables that were related to passage and survival of steelhead kelts that passed through FCRPS dams. Bayesian model averaging of multivariable logistic regression models was used to identify the environmental, temporal, operational, individual, and behavioral variables that had the highest probability of influencing the route of passage and the route-specific survival probabilities for kelts that passed Lower Granite (LGR), Little Goose (LGS), and Lower Monumental (LMN) dams in 2012 and 2013. The posterior probabilities of the best models for predicting route of passage ranged from 0.106 for traditional spill at LMN to 0.720 for turbine passage at LGS. Generally, the behavior (depth and near-dam searching activity) of kelts in the forebay appeared to have the greatest influence on their route of passage. Shallower-migrating kelts had a higher probability of passing via the weir and deeper-migrating kelts had a higher probability of passing via the JBS and turbines than other routes. Kelts that displayed a higher level of near-dam searching activity had a higher probability of passing via the spillway weir and those that did less near-dam searching had a higher probability of passing via the JBS and turbines. The side of the river in which kelts approached the dam and dam operations also affected route of passage. Dam operations and the size and condition of kelts were found to have the greatest effect on route-specific survival probabilities for fish that passed via the spillway at LGS. That is, longer kelts and those in fair condition had a lower probability of survival for fish that passed via the spillway weir. The survival of spillway weir- and deep-spill passed kelts was positively correlated with the percent of the total discharge that passed through turbine unit 4. Too few kelts passed through the traditional spill, JBS, and turbine units to evaluate survival through these routes. The information gathered in this study describes Snake River steelhead kelt passage behavior, rates, and distributions through the FCRPS as well as provide information to biologists and engineers about the dam operations and abiotic conditions that are related to passage and survival of steelhead kelts.« less

  12. Techniques for computing discharge at four Navigation Dams on the Illinois and Des Plaines Rivers in Illinois

    USGS Publications Warehouse

    Mades, Dean M.; Weiss, Linda S.; Gray, John R.

    1991-01-01

    Techniques for computing discharge are developed for Brandon Road Dam on the Des Plaines River and for Dresden Island, Marseilles, and Starved Rock Dams on the Illinois River. At Brandon Road Dam, streamflow is regulated by the operation of Tainter gates and headgates. At Dresden Island, Marseilles, and Starved Rock Dams, only Tainter gates are operated to regulate streamflow. The locks at all dams are equipped with culvert valves that are used to fill and empty the lock. The techniques facilitate determination of discharge at locations along the upper Illinois Waterway where no streamflow-gaging stations exist. The techniques are also useful for computing low flows when the water-surface slope between control structures on the river approaches zero and traditional methods of determining discharge based on slope are unsatisfactory. Two techniques can be used to compute discharge at the dams--gate ratings and tailwater ratings . A gate ratingdescribes the relation between discharge, gate opening, tailwater stage, and headwater stage. A tailwater rating describes the relation between tailwater stage and discharge. Gate ratings for Tainter gates at Dresden Island, Marseilles, and Starved Rock Dams are based on a total of 78 measurements of discharge that range from 569 to 86,400 cubic feet per second. Flood hydrographs developed from the gate ratings and Lockmaster records of gate opening and stage compare closely with streamflow records published for nearby streamflow-gaging stations. Additional measurements are needed to verify gate ratings for Tainter gates and headgates at Brandon Road Dam after the dam rehabilitation is completed. Extensive leakage past deteriorated headgates and sluice gates contributed to uncertainty in the ratings developed for this dam. A useful tailwater rating is developed for Marseilles Dam. Tailwater ratings for Dresden Island Dam and Starved Rock Dam are of limited use because of varying downstream channel-storage conditions. A tailwater rating could not be developed for Brandon Road Dam because its tailwater pool is substantially affected by the headwater pool of Dresden Island Dam.

  13. Have Large Dams Altered Extreme Precipitation Patterns?

    NASA Astrophysics Data System (ADS)

    Hossain, Faisal; Jeyachandran, Indumathi; Pielke, Roger

    2009-12-01

    Dams and their impounded waters are among the most common civil infrastructures, with a long heritage of modern design and operations experience. In particular, large dams, defined by the International Commission on Large Dams (ICOLD) as having a height greater than 15 meters from the foundation and holding a reservoir volume of more than 3 million cubic meters, have the potential to vastly transform local climate, landscapes, regional economics, and urbanization patterns. In the United States alone, about 75,000 dams are capable of storing a volume of water equaling almost 1 year's mean runoff of the nation [Graf, 1999]. The World Commission on Dams (WCD) reports that at least 45,000 large dams have been built worldwide since the 1930s. These sheer numbers raise the question of the extent to which large dams and their impounded waters alter patterns that would have been pervasive had the dams not been built.

  14. Introduction of an Emergency Response Plan for flood loading of Sultan Abu Bakar Dam in Malaysia

    NASA Astrophysics Data System (ADS)

    Said, N. F. Md; Sidek, L. M.; Basri, H.; Muda, R. S.; Razad, A. Z. Abdul

    2016-03-01

    Sultan Abu Bakar Dam Emergency Response Plan (ERP) is designed to assist employees for identifying, monitoring, responding and mitigation dam safety emergencies. This paper is outlined to identification of an organization chart, responsibility for emergency management team and triggering level in Sultan Abu Bakar Dam ERP. ERP is a plan that guides responsibilities for proper operation of Sultan Abu Bakar Dam in respond to emergency incidents affecting the dam. Based on this study four major responsibilities are needed for Abu Bakar Dam owing to protect any probable risk for downstream which they can be Incident Commander, Deputy Incident Commander, On-Scene Commander, Civil Engineer. In conclusion, having organization charts based on ERP studies can be helpful for decreasing the probable risks in any projects such as Abu Bakar Dam and it is a way to identify and suspected and actual dam safety emergencies.

  15. Evaluating the Mosul Dam's Instability after Resumption of Maintenance

    NASA Astrophysics Data System (ADS)

    Al-husseinawi, Y.; Li, Z.; Clarke, P. J.; Edwards, S.

    2017-12-01

    There is serious concern about the safety of Mosul dam in the north of Iraq. Millions of people in the downstream area are exposed to risk of catastrophic collapse of this dam due to its soluble foundation. Recent study (Milillo et al., 2016, Scientific Report/10.1038/srep37408) reported that the dam deformation has accelerated since August 2014, when grouting operations were interrupted due to the conflict in the region. In this study, we investigate the health of Mosul dam since Jun 2016 using three independent datasets: Sentinel-1A/B SAR images, levelling, and GPS measurement. The latter are based on three epochs of terrestrial observation for levelling and GPS data: March 2016, December 2016 and July 2017. During this period, maintenance operations are being recovered to keep the dam stable. The monitoring network, on which the levelling and GPS observations are based, consists of eighty-seven pillars distributed on the dam surface. The results from InSAR and leveling data show that the dam crest is settling by 9 mm/yr. In contrast to previous studies, our results show a deceleration in the settlement. This may be due to the maintenance operations performed in the last few months. InSAR time series analysis was performed using the in-house tool TM-SBAS. When using the small baseline Sentinel-1 constellation, all possibilities of image choice are taken into consideration and the SRTM DEM accuracy is sufficient to generate the differential interferograms. Data from both Sentinel-1A and -1B images are used, and these results can be compared with multi-platform (Envisat, Sentinel-1, Cosmo-SkyMed, and TerraSar-X) data collected during the period between March 2003 and September 2016.

  16. 78 FR 53494 - Dam Safety Modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... fundamental part of this mission was the construction and operation of an integrated system of dams and... by the Federal Emergency Management Agency, TVA prepares for the worst case flooding event in order... appropriate best management practices during all phases of construction and maintenance associated with the...

  17. 43 CFR 418.18 - Diversions at Derby Dam.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Operations and Management § 418.18 Diversions at Derby Dam. (a) Diversions of Truckee River water at Derby Dam must be managed to maintain minimum terminal flow to Lahontan Reservoir or the Carson River except... achieve an average terminal flow of 20 cfs or less during times when diversions to Lahontan Reservoir are...

  18. Enhancing water quality in hydropower system operations

    NASA Astrophysics Data System (ADS)

    Hayes, Donald F.; Labadie, John W.; Sanders, Thomas G.; Brown, Jackson K.

    1998-03-01

    The quality of impounded waters often degrades over time because of thermal stratification, sediment oxygen demands, and accumulation of pollutants. Consequently, reservoir releases impact water quality in tailwaters, channels, and other downstream water bodies. Low dissolved oxygen (DO) concentrations in the Cumberland River below Old Hickory dam result from stratification of upstream reservoirs and seasonally low release rates. Operational changes in upstream hydropower reservoirs may be one method to increase DO levels without substantially impacting existing project purposes. A water quality model of the upper Cumberland basin is integrated into an optimal control algorithm to evaluate water quality improvement opportunities through operational modifications. The integrated water quantity/quality model maximizes hydropower revenues, subject to various flow and headwater operational restrictions for satisfying multiple project purposes, as well as maintenance of water quality targets. Optimal daily reservoir release policies are determined for the summer drawdown period which increase DO concentrations under stratification conditions with minimal impact on hydropower production and other project purposes. Appendixes A-D available with entire article on microfiche. Order by mail from AGU, 2000 Florida Ave., N.W., Washington, DC 20009 or by phone at 800-966-2481; $2.50. Document W97-003. Payment must accompany order.

  19. 33 CFR 208.25 - Pensacola Dam and Reservoir, Grand (Neosho) River, Okla.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... elevation of the reservoir pool and the tailwater, number of gates in operation, spillway and turbine... instructions for operation of the reservoir in the interest of flood control during an emergency condition when... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Pensacola Dam and Reservoir...

  20. 33 CFR 208.26 - Altus Dam and Reservoir, North Fork Red River, Okla.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... elevation forecast indicates that this operation will result in a reservoir level exceeding elevation 1562... and reservoir from major damage. (j) Any time that the Bureau of Reclamation determines that operation... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Altus Dam and Reservoir, North...

  1. 33 CFR 208.26 - Altus Dam and Reservoir, North Fork Red River, Okla.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... elevation forecast indicates that this operation will result in a reservoir level exceeding elevation 1562... and reservoir from major damage. (j) Any time that the Bureau of Reclamation determines that operation... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Altus Dam and Reservoir, North...

  2. 33 CFR 208.25 - Pensacola Dam and Reservoir, Grand (Neosho) River, Okla.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... elevation of the reservoir pool and the tailwater, number of gates in operation, spillway and turbine... instructions for operation of the reservoir in the interest of flood control during an emergency condition when... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Pensacola Dam and Reservoir...

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jager, Yetta; Smith, Brennan T

    Hydroelectric power provides a cheap source of electricity with few carbon emissions. Yet, reservoirs are not operated sustainably, which we define as meeting societal needs for water and power while protecting long-term health of the river ecosystem. Reservoirs that generate hydropower are typically operated with the goal of maximizing energy revenue, while meeting other legal water requirements. Reservoir optimization schemes used in practice do not seek flow regimes that maximize aquatic ecosystem health. Here, we review optimization studies that considered environmental goals in one of three approaches. The first approach seeks flow regimes that maximize hydropower generations while satisfying legalmore » requirements, including environmental (or minimum) flows. Solutions from this approach are often used in practice to operate hydropower projects. In the second approach, flow releases from a dam are timed to meet water quality constraints on dissolved oxygen (DO), temperature and nutrients. In the third approach, flow releases are timed to improve the health of fish populations. We conclude by suggesting three steps for bringing multi-objective reservoir operation closer to the goal of ecological sustainability: (1) conduct research to identify which features of flow variation are essential for river health and to quantify these relationships, (2) develop valuation methods to assess the total value of river health and (3) develop optimal control softwares that combine water balance modeling with models that predict ecosystem responses to flow.« less

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jager, Yetta; Smith, Brennan T

    Hydroelectric power provides a cheap source of electricity with few carbon emissions. Yet, reservoirs are not operated sustainably, which we define as meeting societal needs for water and power while protecting long-term health of the river ecosystem. Reservoirs that generate hydropower are typically operated with the goal of maximizing energy revenue, while meeting other legal water requirements. Reservoir optimization schemes used in practice do not seek flow regimes that maximize aquatic ecosystem health. Here, we review optimization studies that considered environmental goals in one of three approaches. The first approach seeks flow regimes that maximize hydropower generation, while satisfying legalmore » requirements, including environmental (or minimum) flows. Solutions from this approach are often used in practice to operate hydropower projects. In the second approach, flow releases from a dam are timed to meet water quality constraints on dissolved oxygen (DO), temperature and nutrients. In the third approach, flow releases are timed to improve the health of fish populations. We conclude by suggesting three steps for bringing multi-objective reservoir operation closer to the goal of ecological sustainability: (1) conduct research to identify which features of flow variation are essential for river health and to quantify these relationships, (2) develop valuation methods to assess the total value of river health and (3) develop optimal control softwares that combine water balance modelling with models that predict ecosystem responses to flow.« less

  5. The influence of major dams on hydrology through the drainage network of the Sacramento River basin, California

    USGS Publications Warehouse

    Singer, M.B.

    2007-01-01

    This paper reports basinwide patterns of hydrograph alteration via statistical and graphical analysis from a network of long-term streamflow gauges located various distances downstream of major dams and confluences in the Sacramento River basin in California, USA. Streamflow data from 10 gauging stations downstream of major dams were divided into hydrologic series corresponding to the periods before and after dam construction. Pre- and post-dam flows were compared with respect to hydrograph characteristics representing frequency, magnitude and shape: annual flood peak, annual flow trough, annual flood volume, time to flood peak, flood drawdown time and interarrival time. The use of such a suite of characteristics within a statistical and graphical framework allows for generalising distinct strategies of flood control operation that can be identified without any a priori knowledge of operations rules. Dam operation is highly dependent on the ratio of reservoir capacity to annual flood volume (impounded runoff index). Dams with high values of this index generally completely cut off flood peaks thus reducing time to peak, drawdown time and annual flood volume. Those with low values conduct early and late flow releases to extend the hydrograph, increasing time to peak, drawdown time and annual flood volume. The analyses reveal minimal flood control benefits from foothill dams in the lower Sacramento River (i.e. dissipation of the down-valley flood control signal). The lower part of the basin is instead reliant on a weir and bypass system to control lowland flooding. Data from a control gauge (i.e. with no upstream dams) suggest a background signature of global climate change expressed as shortened flood hydrograph falling limbs and lengthened flood interarrival times at low exceedence probabilities. This research has implications for flood control, water resource management, aquatic and riparian ecosystems and for rehabilitation strategies involving flow alteration and/or manipulation of sediment supplies. Copyright ?? 2006 John Wiley & Sons, Ltd.

  6. Application of wavelet analysis for monitoring the hydrologic effects of dam operation: Glen canyon dam and the Colorado River at lees ferry, Arizona

    USGS Publications Warehouse

    White, M.A.; Schmidt, J.C.; Topping, D.J.

    2005-01-01

    Wavelet analysis is a powerful tool with which to analyse the hydrologic effects of dam construction and operation on river systems. Using continuous records of instantaneous discharge from the Lees Ferry gauging station and records of daily mean discharge from upstream tributaries, we conducted wavelet analyses of the hydrologic structure of the Colorado River in Grand Canyon. The wavelet power spectrum (WPS) of daily mean discharge provided a highly compressed and integrative picture of the post-dam elimination of pronounced annual and sub-annual flow features. The WPS of the continuous record showed the influence of diurnal and weekly power generation cycles, shifts in discharge management, and the 1996 experimental flood in the post-dam period. Normalization of the WPS by local wavelet spectra revealed the fine structure of modulation in discharge scale and amplitude and provides an extremely efficient tool with which to assess the relationships among hydrologic cycles and ecological and geomorphic systems. We extended our analysis to sections of the Snake River and showed how wavelet analysis can be used as a data mining technique. The wavelet approach is an especially promising tool with which to assess dam operation in less well-studied regions and to evaluate management attempts to reconstruct desired flow characteristics. Copyright ?? 2005 John Wiley & Sons, Ltd.

  7. Grand Canyon Monitoring and Research Center

    USGS Publications Warehouse

    Hamill, John F.

    2009-01-01

    The Grand Canyon of the Colorado River, one of the world's most spectacular gorges, is a premier U.S. National Park and a World Heritage Site. The canyon supports a diverse array of distinctive plants and animals and contains cultural resources significant to the region's Native Americans. About 15 miles upstream of Grand Canyon National Park sits Glen Canyon Dam, completed in 1963, which created Lake Powell. The dam provides hydroelectric power for 200 wholesale customers in six western States, but it has also altered the Colorado River's flow, temperature, and sediment-carrying capacity. Over time this has resulted in beach erosion, invasion and expansion of nonnative species, and losses of native fish. Public concern about the effects of Glen Canyon Dam operations prompted the passage of the Grand Canyon Protection Act of 1992, which directs the Secretary of the Interior to operate the dam 'to protect, mitigate adverse impacts to, and improve values for which Grand Canyon National Park and Glen Canyon National Recreation Area were established...' This legislation also required the creation of a long-term monitoring and research program to provide information that could inform decisions related to dam operations and protection of downstream resources.

  8. Summary report of responses of key resources to the 2000 Low Steady Summer Flow experiment, along the Colorado River downstream from Glen Canyon Dam, Arizona

    USGS Publications Warehouse

    Ralston, Barbara E.

    2011-01-01

    In the spring and summer of 2000, a series of steady discharges of water from Glen Canyon Dam on the Colorado River were used to evaluate the effects of aquatic habitat stability and water temperatures on native fish growth and survival, with a special focus on the endangered humpback chub (Gila cypha), downstream from the dam in Grand Canyon. The steady releases were bracketed by peak powerplant releases in late-May and early-September. The duration and volume of releases from the dam varied between spring and summer. The intent of the experimental hydrograph was to mimic predam river discharge patterns by including a high, steady discharge in the spring and a low, steady discharge in the summer. The hydrologic experiment was called the Low Steady Summer Flow (LSSF) experiment because steady discharges of 226 m3/s dominated the hydrograph for 4 months from June through September 2000. The experimental hydrograph was developed in response to one of the U.S. Fish and Wildlife Service's Recommended and Prudent Alternatives (RPA) in its Biological Opinion of the Operation of Glen Canyon Dam Final Environmental Impact Statement. The RPA focused on the hypothesis that seasonally adjusted steady flows were dam operations that might benefit humpback chub more than the Record of Decision operations, known as Modified Low Fluctuating Flow (MLFF) operations. Condensed timelines between planning and implementation (2 months) of the experiment and the time required for logistics, purchasing, and contracting resulted in limited data collection during the high-release part of the experiment that occurred in spring. The LSSF experiment is the longest planned hydrograph that departed from the MLFF operations since Record of Decision operations began in 1996. As part of the experiment, several studies focused on the responses of physical properties related to environments that young-of-year (YOY) native fish might occupy (for example, measuring mainstem and shoreline water temperature, and quantifying useable shorelines). The part of the hydrograph that included a habitat maintenance flow (a 4-day spike at a powerplant capacity of 877 m3/s) and sustained high releases in April and May (averaging 509 m3/s) resulted in sediment export to Lake Mead, the reservoir downstream from Glen Canyon Dam, which is outside the study area. Some mid-elevation sandbar building (between 566 and 877 m3/s stage elevations) occurred from existing sediment deposits rather than from sediment inputs from tributaries during the previous winter. Low releases in the summer combined with low tributary sediment inputs resulted in minor sediment accumulation in the study area. The September habitat maintenance flow reworked accumulated sediment and resulted in increases in the area of some backwaters. The mainstem water temperatures in the reach near the Little Colorado River during the LSSF experiment varied little from previous years. Mainstem water temperatures in western Grand Canyon average 17 to 20 degrees C. During the LSSF, backwaters warmed more than other shoreline environments during the day, but most backwaters returned to mainstem water temperatures overnight. Shoreline surface water temperatures from river mile (RM) 30 to 72 varied between 9 and 28 degrees C in the middle of the day in July. These temperatures are within the optimal temperature range for humpback chub growth and spawning, which is between 15 and 24 degrees C. How surface water temperatures transfer to subsurface water temperatures is unknown. Data collection associated with the response of fish to the 2000 LSSF hydrograph focused on fish growth and abundance along the Colorado River in Grand Canyon. The target resource, humpback chub and other native fishes, did not respond in a strongly positive or strongly negative manner to the LSSF hydrograph during the sampling period, which extended from June to September 2000. In 2000, the mean total length of YOY native fishes was similar to the mean

  9. A simplified water temperature model for the Colorado River below Glen Canyon Dam

    USGS Publications Warehouse

    Wright, S.A.; Anderson, C.R.; Voichick, N.

    2009-01-01

    Glen Canyon Dam, located on the Colorado River in northern Arizona, has affected the physical, biological and cultural resources of the river downstream in Grand Canyon. One of the impacts to the downstream physical environment that has important implications for the aquatic ecosystem is the transformation of the thermal regime from highly variable seasonally to relatively constant year-round, owing to hypolimnetic releases from the upstream reservoir, Lake Powell. Because of the perceived impacts on the downstream aquatic ecosystem and native fish communities, the Glen Canyon Dam Adaptive Management Program has considered modifications to flow releases and release temperatures designed to increase downstream temperatures. Here, we present a new model of monthly average water temperatures below Glen Canyon Dam designed for first-order, relatively simple evaluation of various alternative dam operations. The model is based on a simplified heat-exchange equation, and model parameters are estimated empirically. The model predicts monthly average temperatures at locations up to 421 km downstream from the dam with average absolute errors less than 0.58C for the dataset considered. The modelling approach used here may also prove useful for other systems, particularly below large dams where release temperatures are substantially out of equilibrium with meteorological conditions. We also present some examples of how the model can be used to evaluate scenarios for the operation of Glen Canyon Dam.

  10. National Dam Safety Program. Highland Park Reservoir Dam (Inventory Number N.Y. 790), Genesee River Basin, Monroe County, New York. Phase I Inspection Report,

    DTIC Science & Technology

    1981-09-14

    34 rga Highland Park Reservoir Dam Vi’.sual I. .. ’. •Genesee River Basin, ’!ydrolozy. ". ". . . Scabi tyMo r e C u t.,.- Js eps’ •; ::or.ation -3 :..i :n...dam impounds a municipal water storage reservoir. g. Design and Construction History The dam was designed and built around 1875. h. Normal Operating... History : Date Constructed Around 1875 Date(s) Reconstructed N/A Designer Unknown Constructed by Unknown Owner Water Department, City of Rochester, New

  11. National Program for Inspection of Non-Federal Dams. Batterson Park Pond Dam (CT 00262), Connecticut River Basin, Farmington/New Britain, Connecticut. Phase I Inspection Report.

    DTIC Science & Technology

    1978-12-01

    Division to inspect and report on selected dams in the State of Connecticut. Authorization and notice to proceed were issued to Storch Engineers under a...operable however. c. Size Classification - The size classification of I the dam is intermediate. The storage (2,520 acre-feet) governs the...Landscape Architects Planners - Environental Consultants 13ATFRMN ?ARtK P*Nr3 DAm CAPAC MlY CUR~VE ELEV .DP/ R AvJQ ATkrp oi .V0i 30-70 31 F q * .7 CO

  12. Examining global electricity supply vulnerability to climate change using a high-fidelity hydropower dam model.

    PubMed

    Turner, Sean W D; Ng, Jia Yi; Galelli, Stefano

    2017-07-15

    An important and plausible impact of a changing global climate is altered power generation from hydroelectric dams. Here we project 21st century global hydropower production by forcing a coupled, global hydrological and dam model with three General Circulation Model (GCM) projections run under two emissions scenarios. Dams are simulated using a detailed model that accounts for plant specifications, storage dynamics, reservoir bathymetry and realistic, optimized operations. We show that the inclusion of these features can have a non-trivial effect on the simulated response of hydropower production to changes in climate. Simulation results highlight substantial uncertainty in the direction of change in globally aggregated hydropower production (~-5 to +5% change in mean global production by the 2080s under a high emissions scenario, depending on GCM). Several clearly impacted hotspots are identified, the most prominent of which encompasses the Mediterranean countries in southern Europe, northern Africa and the Middle East. In this region, hydropower production is projected to be reduced by approximately 40% on average by the end of the century under a high emissions scenario. After accounting for each country's dependence on hydropower for meeting its current electricity demands, the Balkans countries emerge as the most vulnerable (~5-20% loss in total national electricity generation depending on country). On the flipside, a handful of countries in Scandinavia and central Asia are projected to reap a significant increase in total electrical production (~5-15%) without investing in new power generation facilities. Copyright © 2017 Elsevier B.V. All rights reserved.

  13. Examining global electricity supply vulnerability to climate change using a high-fidelity hydropower dam model

    DOE PAGES

    Turner, Sean W. D.; Ng, Jia Yi; Galelli, Stefano

    2017-03-07

    Here, an important and plausible impact of a changing global climate is altered power generation from hydroelectric dams. Here we project 21st century global hydropower production by forcing a coupled, global hydrological and dam model with three General Circulation Model (GCM) projections run under two emissions scenarios. Dams are simulated using a detailed model that accounts for plant specifications, storage dynamics, reservoir bathymetry and realistic, optimized operations. We show that the inclusion of these features can have a non-trivial effect on the simulated response of hydropower production to changes in climate. Simulation results highlight substantial uncertainty in the direction ofmore » change in globally aggregated hydropower production (~–5 to + 5% change in mean global production by the 2080s under a high emissions scenario, depending on GCM). Several clearly impacted hotspots are identified, the most prominent of which encompasses the Mediterranean countries in southern Europe, northern Africa and the Middle East. In this region, hydropower production is projected to be reduced by approximately 40% on average by the end of the century under a high emissions scenario. After accounting for each country's dependence on hydropower for meeting its current electricity demands, the Balkans countries emerge as the most vulnerable (~ 5–20% loss in total national electricity generation depending on country). On the flipside, a handful of countries in Scandinavia and central Asia are projected to reap a significant increase in total electrical production (~ 5–15%) without investing in new power generation facilities.« less

  14. Examining global electricity supply vulnerability to climate change using a high-fidelity hydropower dam model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Turner, Sean W. D.; Ng, Jia Yi; Galelli, Stefano

    Here, an important and plausible impact of a changing global climate is altered power generation from hydroelectric dams. Here we project 21st century global hydropower production by forcing a coupled, global hydrological and dam model with three General Circulation Model (GCM) projections run under two emissions scenarios. Dams are simulated using a detailed model that accounts for plant specifications, storage dynamics, reservoir bathymetry and realistic, optimized operations. We show that the inclusion of these features can have a non-trivial effect on the simulated response of hydropower production to changes in climate. Simulation results highlight substantial uncertainty in the direction ofmore » change in globally aggregated hydropower production (~–5 to + 5% change in mean global production by the 2080s under a high emissions scenario, depending on GCM). Several clearly impacted hotspots are identified, the most prominent of which encompasses the Mediterranean countries in southern Europe, northern Africa and the Middle East. In this region, hydropower production is projected to be reduced by approximately 40% on average by the end of the century under a high emissions scenario. After accounting for each country's dependence on hydropower for meeting its current electricity demands, the Balkans countries emerge as the most vulnerable (~ 5–20% loss in total national electricity generation depending on country). On the flipside, a handful of countries in Scandinavia and central Asia are projected to reap a significant increase in total electrical production (~ 5–15%) without investing in new power generation facilities.« less

  15. Wind-Driven Ecological Flow Regimes Downstream from Hydropower Dams

    NASA Astrophysics Data System (ADS)

    Kern, J.; Characklis, G. W.

    2012-12-01

    Conventional hydropower can be turned on and off quicker and less expensively than thermal generation (coal, nuclear, or natural gas). These advantages enable hydropower utilities to respond to rapid fluctuations in energy supply and demand. More recently, a growing renewable energy sector has underlined the need for flexible generation capacity that can complement intermittent renewable resources such as wind power. While wind power entails lower variable costs than other types of generation, incorporating it into electric power systems can be problematic. Due to variable and unpredictable wind speeds, wind power is difficult to schedule and must be used when available. As a result, integrating large amounts of wind power into the grid may result in atypical, swiftly changing demand patterns for other forms of generation, placing a premium on sources that can be rapidly ramped up and down. Moreover, uncertainty in wind power forecasts will stipulate increased levels of 'reserve' generation capacity that can respond quickly if real-time wind supply is less than expected. These changes could create new hourly price dynamics for energy and reserves, altering the short-term financial signals that hydroelectric dam operators use to schedule water releases. Traditionally, hourly stream flow patterns below hydropower dams have corresponded in a very predictable manner to electricity demand, whose primary factors are weather (hourly temperature) and economic activity (workday hours). Wind power integration has the potential to yield more variable, less predictable flows at hydro dams, flows that at times could resemble reciprocal wind patterns. An existing body of research explores the impacts of standard, demand-following hydroelectric dams on downstream ecological flows; but weighing the benefits of increased reliance on wind power against further impacts to ecological flows may be a novel challenge for the environmental community. As a preliminary step in meeting this challenge, the following study was designed to investigate the potential for wind power integration to alter riparian flow regimes below hydroelectric dams. A hydrological model of a three-dam cascade in the Roanoke River basin (Virginia, USA) is interfaced with a simulated electricity market (i.e. a unit commitment problem) representing the Dominion Zone of PJM Interconnection. Incorporating forecasts of electricity demand, hydro capacity and wind availability, a mixed-integer optimization program minimizes the system cost of meeting hourly demand and reserve requirements by means of a diverse generation portfolio (e.g. nuclear, fossil, hydro, and biomass). A secondary 'balancing' energy market is executed if real-time wind generation is less than the day-ahead forecast, calling upon reserved generation resources to meet the supply shortfall. Hydropower release schedules are determined across a range of wind development scenarios (varying wind's fraction of total installed generating capacity, as well as its geographical source region). Flow regimes for each wind development scenario are compared against both historical and simulated flows under current operations (negligible wind power), as well as simulated natural flows (dam removal), in terms of ecologically relevant flow metrics. Results quantify the ability of wind power development to alter within-week stream flows downstream from hydropower dams.

  16. 76 FR 78161 - Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-16

    ... Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship...; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal... the U.S. Army Corps of Engineers' maintenance operations of dispersal barrier IIB. During these...

  17. 88. AVALON DAM Photographic copy of construction drawing dated ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    88. AVALON DAM - Photographic copy of construction drawing dated February 9, 1912 (from Record Group 115, Box 17, Denver Branch of the National Archives, Denver) METHOD OF CLOSING UP OLD GATE OPENINGS IN SPILLWAY AND ARRANGEMENT OF TURBINES, OPERATING CYLINDER GATES - Carlsbad Irrigation District, Avalon Dam, On Pecos River, 4 miles North of Carlsbad, Carlsbad, Eddy County, NM

  18. 5. LOOKING WEST ALONG THE AXIS OF THE DAM TOWARD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. LOOKING WEST ALONG THE AXIS OF THE DAM TOWARD THE OUTLET STRUCTURE. HAND OPERATED MECHANICAL TAMPERS ARE COMPACTING THE FILL ALONG THE STEEL SHEET PILING CUTOFF WALL IN THE FOREGROUND. Volume XIX, No. 6, April 12, 1940. - Prado Dam, Santa Ana River near junction of State Highways 71 & 91, Corona, Riverside County, CA

  19. 76 FR 54766 - Amnor Hydro West Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14063-000] Amnor Hydro West... feasibility of constructing the Hiram M. Chittenden Lock and Dam Hydroelectric Project (Hiram Dam Project or project) located at the Hiram M. Chittenden Lock and Dam facility owned and operated by the U.S. Army...

  20. 33 CFR 208.27 - Fort Cobb Dam and Reservoir, Pond (Cobb) Creek, Oklahoma.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Engineer showing the elevation of the reservoir level; number of river outlet works gates in operation with... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Fort Cobb Dam and Reservoir, Pond..., DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE FLOOD CONTROL REGULATIONS § 208.27 Fort Cobb Dam and Reservoir...

  1. 33 CFR 208.27 - Fort Cobb Dam and Reservoir, Pond (Cobb) Creek, Oklahoma.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Engineer showing the elevation of the reservoir level; number of river outlet works gates in operation with... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Fort Cobb Dam and Reservoir, Pond..., DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE FLOOD CONTROL REGULATIONS § 208.27 Fort Cobb Dam and Reservoir...

  2. 76 FR 64104 - Notice To Solicit Comments and Hold Public Scoping Meetings on the Adoption of a Long-term...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ... Long-term Experimental and Management Plan (LTEMP) for the operation of Glen Canyon Dam. This Federal... and Hold Public Scoping Meetings on the Adoption of a Long-term Experimental and Management Plan for the Operation of Glen Canyon Dam AGENCY: Bureau of Reclamation and National Park Service, Interior...

  3. Thermal pollution in rivers: Will adding gravel help to cool them down?

    Treesearch

    Marie Oliver; Gordon Grant; Barbara Burkholder

    2011-01-01

    Thermal pollution in rivers can be caused by dams, logging, municipal wastewater treatment, and other human activities. High water termperatures stress ecosystems, kill fish, and promote disease and parasites, and so dam operators, timber companies, and municipalities are held responsible for thermal loading caused by their operations. These entities are looking for...

  4. Study the impact of rainfall on the United Arab Emirates dams using remote sensing and image processing techniques

    NASA Astrophysics Data System (ADS)

    Al Marzouqi, Fatima A.; Al Besher, Shaikha A.; Al Mansoori, Saeed H.

    2017-10-01

    The United Arab Emirates (UAE) has given great attention to the environment and sustainable development through applications of best practices of global standards that ensure optimal investment in natural resources. Since the UAE is located in an arid region which is known as dry, sandy and get a small amount of rainfall, thus the water resources are limited and accordingly, the government has initiated an integrated water resources management (IWRM) strategy to meet the increasing demands of water. Dams are considered as one of the important strategies that are suitable for this arid region. An event of rainfall if between heavy to severe in a short duration could cause flash floods and damages to population centers and areas of agriculture nearby. To prevent that from happening, several dams and barriers were built to protect human life and infrastructure. Besides contribution to enhance the water resources and use them optimally to irrigate the growing agricultural areas across the country. Geographically, most of the dams were located in the northern and eastern part of the UAE, around mountainous areas. This study aims to monitor the changes that occurred to five dams of the north-eastern region of the UAE during 2015 and 2016 through the use of remote sensing technology of optical images captured by "DubaiSat-2". The segmentation approach utilized in this study is based on a band ratio technique called Normalized Difference Water Index (NDWI). The experimental results revealed that the proposed approach is efficient in detecting dams from multispectral satellite images.

  5. Assessing the potential for change in the middle Yangtze River channel following impoundment of the Three Gorges Dam

    NASA Astrophysics Data System (ADS)

    Yuan, Wenhao; Yin, Daowei; Finlayson, Brian; Chen, Zhongyuan

    2012-04-01

    The geomorphic impacts of dams on downstream river channels are complex, not readily predictable for specific cases, but widely reported in the literature. For the Three Gorges Dam on the Yangtze (Changjiang) River in China, no studies of the impact of the changed flow and sediment conditions below the dam on the behaviour of the channel were included in the pre-dam feasibility report. We have assembled a database of flow and sediment data for the middle Yangtze River from Yichang to Hankou and used this to analyse changes following the closure of the dam. While total flow is little affected, the operating strategy for the dam that provides for storage of part of the summer high flows to maintain hydroelectric power generation in winter (the low flow season) is reflected in changes to the seasonal distribution of flow below the dam. We calculated potential sediment carrying capacity and compared it with measured sediment concentrations for both pre- and post-dam conditions. While channel sedimentation is indicated along the middle Yangtze for pre-dam conditions, scour is indicated for post-dam conditions, highest at Yichang immediately below the dam and decreasing downstream.

  6. Simulating future water temperatures in the North Santiam River, Oregon

    NASA Astrophysics Data System (ADS)

    Buccola, Norman L.; Risley, John C.; Rounds, Stewart A.

    2016-04-01

    A previously calibrated two-dimensional hydrodynamic and water-quality model (CE-QUAL-W2) of Detroit Lake in western Oregon was used in conjunction with inflows derived from Precipitation-Runoff Modeling System (PRMS) hydrologic models to examine in-lake and downstream water temperature effects under future climate conditions. Current and hypothetical operations and structures at Detroit Dam were imposed on boundary conditions derived from downscaled General Circulation Models in base (1990-1999) and future (2059-2068) periods. Compared with the base period, future air temperatures were about 2 °C warmer year-round. Higher air temperature and lower precipitation under the future period resulted in a 23% reduction in mean annual PRMS-simulated discharge and a 1 °C increase in mean annual estimated stream temperatures flowing into the lake compared to the base period. Simulations incorporating current operational rules and minimum release rates at Detroit Dam to support downstream habitat, irrigation, and water supply during key times of year resulted in lower future lake levels. That scenario results in a lake level that is above the dam's spillway crest only about half as many days in the future compared to historical frequencies. Managing temperature downstream of Detroit Dam depends on the ability to blend warmer water from the lake's surface with cooler water from deep in the lake, and the spillway is an important release point near the lake's surface. Annual average in-lake and release temperatures from Detroit Lake warmed 1.1 °C and 1.5 °C from base to future periods under present-day dam operational rules and fill schedules. Simulated dam operations such as beginning refill of the lake 30 days earlier or reducing minimum release rates (to keep more water in the lake to retain the use of the spillway) mitigated future warming to 0.4 and 0.9 °C below existing operational scenarios during the critical autumn spawning period for endangered salmonids. A hypothetical floating surface withdrawal at Detroit Dam improved temperature control in summer and autumn (0.6 °C warmer in summer, 0.6 °C cooler in autumn compared to existing structures) without altering release rates or lake level management rules.

  7. Slit-check dams for the control of debris flow

    NASA Astrophysics Data System (ADS)

    Armanini, Aronne; Larcher, Michele

    2017-04-01

    Debris flows are paroxysmal events that mobilize, alongside water, huge quantities of sediment in a very short time, then with both solid and liquid huge discharges, possibly exceeding the capacity of the current torrent restoration works. In this respect, the climate change forcing cannot be ignored. In the majority of urbanized areas, that are generally the most vulnerable, there is often not enough space to create channelling works able to let the volumes pass through without overflowing. The simplest, less expensive and most sustainable solution consists in reducing the peak solid discharge by creating storage areas upstream of the settlements, typically upstream of the alluvial fans, allowing for reduced works of canalization, that are compatible with the constraints imposed by the urbanization. The general idea consists in storing a part of the flowing solids during the peak of the hydrograph and releasing it in a successive phase or during minor floods. For this purpose, and in order to optimize the solid peak discharge reduction, it is necessary that properly designed open-check dams, capable of inducing a significative sedimentation of the solid discharge only when this exceeds a design-threshold value, control the deposition basins. A correct design of the check dam is crucial in order to induce the sedimentation in the right amount and at the right moment: a too early sedimentation might fill the volume before the peak, like in the case of close-check dams, while a too weak sedimentation might not use the whole available volume. In both cases, the channelling works might not be sufficient to let all the flow pass through, compromising the safety of the settlement. To avoid this inconvenience, we propose the use of slit-check dams, whose efficiency has already been proved for bed load. Check dams are often designed only on the base of the designer's experience. Besides, even today it is often believed that the filtering effect of open check dams is exerted through a mechanical sieve, while it was proved that the retention of the solid material is rather due to a hydrodynamic effect induced by the narrowing of the section. Also in the case of debris flow, through proper balances of liquid and solid mass and energy it is possible to obtain a rational criterion for designing the width of the slit in order to obtain a sediment deposition of desired elevation for a given design discharge. In this way the use of the retention basin can be optimized in order to maximize the reduction of the debris flow peak discharge. Flume experiments were carried out in steady conditions at the University of Trento and confirmed with good agreement the prediction of the theory. As in the case of ordinary sediment transport, the clogging induced by the vegetal material represents the major problem for the operational reliability of this systems and needs therefore to be further investigated.

  8. Effects of Hydroelectric Dam Operations on the Restoration Potential of Snake River Fall Chinook Salmon (Oncorhynchus tshawytscha) Spawning Habitat Final Report, October 2005 - September 2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hanrahan, Timothy P.; Richmond, Marshall C.; Arntzen, Evan V.

    2007-11-13

    This report describes research conducted by the Pacific Northwest National Laboratory for the Bonneville Power Administration (BPA) as part of the Fish and Wildlife Program directed by the Northwest Power and Conservation Council. The study evaluated the restoration potential of Snake River fall Chinook salmon spawning habitat within the impounded lower Snake River. The objective of the research was to determine if hydroelectric dam operations could be modified, within existing system constraints (e.g., minimum to normal pool levels; without partial removal of a dam structure), to increase the amount of available fall Chinook salmon spawning habitat in the lower Snakemore » River. Empirical and modeled physical habitat data were used to compare potential fall Chinook salmon spawning habitat in the Snake River, under current and modified dam operations, with the analogous physical characteristics of an existing fall Chinook salmon spawning area in the Columbia River. The two Snake River study areas included the Ice Harbor Dam tailrace downstream to the Highway 12 bridge and the Lower Granite Dam tailrace downstream approximately 12 river kilometers. These areas represent tailwater habitat (i.e., riverine segments extending from a dam downstream to the backwater influence from the next dam downstream). We used a reference site, indicative of current fall Chinook salmon spawning areas in tailwater habitat, against which to compare the physical characteristics of each study site. The reference site for tailwater habitats was the section extending downstream from the Wanapum Dam tailrace on the Columbia River. Fall Chinook salmon spawning habitat use data, including water depth, velocity, substrate size and channelbed slope, from the Wanapum reference area were used to define spawning habitat suitability based on these variables. Fall Chinook salmon spawning habitat suitability of the Snake River study areas was estimated by applying the Wanapum reference reach habitat suitability criteria to measured and modeled habitat data from the Snake River study areas. Channel morphology data from the Wanapum reference reach and the Snake River study areas were evaluated to identify geomorphically suitable fall Chinook salmon spawning habitat. The results of this study indicate that a majority of the Ice Harbor and Lower Granite study areas contain suitable fall Chinook salmon spawning habitat under existing hydrosystem operations. However, a large majority of the currently available fall Chinook salmon spawning habitat in the Ice Harbor and Lower Granite study areas is of low quality. The potential for increasing, through modifications to hydrosystem operations (i.e., minimum pool elevation of the next downstream dam), the quantity or quality of fall Chinook salmon spawning habitat appears to be limited. Estimates of the amount of potential fall Chinook salmon spawning habitat in the Ice Harbor study area decreased as the McNary Dam forebay elevation was lowered from normal to minimum pool elevation. Estimates of the amount of potential fall Chinook salmon spawning habitat in the Lower Granite study area increased as the Little Goose Dam forebay elevation was lowered from normal to minimum pool elevation; however, 97% of the available habitat was categorized within the range of lowest quality. In both the Ice Harbor and Lower Granite study areas, water velocity appears to be more of a limiting factor than water depth for fall Chinook salmon spawning habitat, with both study areas dominated by low-magnitude water velocity. The geomorphic suitability of both study areas appears to be compromised for fall Chinook salmon spawning habitat, with the Ice Harbor study area lacking significant bedforms along the longitudinal thalweg profile and the Lower Granite study area lacking cross-sectional topographic diversity. To increase the quantity of available fall Chinook salmon spawning habitat in the Ice Harbor and Lower Granite study area, modifications to hydroelectric dam operations beyond those evaluated in this study likely would be necessary. Modifications may include operational and structural changes, such as lowering downstream dam forebay elevations to less than minimum pool. There is a large amount of uncertainty as to whether or not such modifications could increase the quantity of available fall Chinook salmon spawning habitat in the Ice Harbor and Lower Granite study area. The results from this study provide some certainty that the quantity and quality of fall Chinook salmon spawning habitat within the lower Snake River are not likely to be increased within the existing hydroelectric dam operations.« less

  9. Quantifying and Generalizing Hydrologic Responses to Dam Regulation using a Statistical Modeling Approach

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McManamay, Ryan A

    2014-01-01

    Despite the ubiquitous existence of dams within riverscapes, much of our knowledge about dams and their environmental effects remains context-specific. Hydrology, more than any other environmental variable, has been studied in great detail with regard to dam regulation. While much progress has been made in generalizing the hydrologic effects of regulation by large dams, many aspects of hydrology show site-specific fidelity to dam operations, small dams (including diversions), and regional hydrologic regimes. A statistical modeling framework is presented to quantify and generalize hydrologic responses to varying degrees of dam regulation. Specifically, the objectives were to 1) compare the effects ofmore » local versus cumulative dam regulation, 2) determine the importance of different regional hydrologic regimes in influencing hydrologic responses to dams, and 3) evaluate how different regulation contexts lead to error in predicting hydrologic responses to dams. Overall, model performance was poor in quantifying the magnitude of hydrologic responses, but performance was sufficient in classifying hydrologic responses as negative or positive. Responses of some hydrologic indices to dam regulation were highly dependent upon hydrologic class membership and the purpose of the dam. The opposing coefficients between local and cumulative-dam predictors suggested that hydrologic responses to cumulative dam regulation are complex, and predicting the hydrology downstream of individual dams, as opposed to multiple dams, may be more easy accomplished using statistical approaches. Results also suggested that particular contexts, including multipurpose dams, high cumulative regulation by multiple dams, diversions, close proximity to dams, and certain hydrologic classes are all sources of increased error when predicting hydrologic responses to dams. Statistical models, such as the ones presented herein, show promise in their ability to model the effects of dam regulation effects at large spatial scales as to generalize the directionality of hydrologic responses.« less

  10. Water-Energy Nexus: Examining The Crucial Connection Through Simulation Based Optimization

    NASA Astrophysics Data System (ADS)

    Erfani, T.; Tan, C. C.

    2014-12-01

    With a growing urbanisation and the emergence of climate change, the world is facing a more water constrained future. This phenomenon will have direct impacts on the resilience and performance of energy sector as water is playing a key role in electricity generation processes. As energy is becoming a thirstier resource and the pressure on finite water sources is increasing, modelling and analysing this closely interlinked and interdependent loop, called 'water-energy nexus' is becoming an important cross-disciplinary challenge. Conflict often arises in transboundary river where several countries share the same source of water to be used in productive sectors for economic growth. From the perspective of the upstream users, it would be ideal to store the water for hydropower generation and protect the city against drought whereas the downstream users need the supply of water for growth. This research use the case study on the transboundary Blue Nile River basin located in the Middle East where the Ethiopian government decided to invest on building a new dam to store the water and generate hydropower. This leads to an opposition by downstream users as they believe that the introduction of the dam would reduce the amount of water available downstream. This calls for a compromise management where the reservoir operating rules need to be derived considering the interdependencies between the resources available and the requirements proposed by all users. For this, we link multiobjective optimization algorithm to water-energy use simulation model to achieve effective management of the transboundary reservoir operating strategies. The objective functions aim to attain social and economic welfare by minimizing the deficit of water supply and maximizing the hydropower generation. The study helps to improve the policies by understanding the value of water and energy in their alternative uses. The results show how different optimal reservoir release rules generate different trade-off solutions inherently involved in upstream and downstream users requirements and decisions. This study stimulates the research in this context by using simulation based optimization techniques to manage for security for food, water and energy generation, which leads to improve sustainability and long-term political stability.

  11. Use of an autonomous sensor to evaluate the biological performance of the advanced turbine at Wanapum Dam

    DOE PAGES

    Deng, Zhiqun; Carlson, Thomas J.; Duncan, Joanne P.; ...

    2010-10-13

    Hydropower is the largest renewable energy resource in the United States and the world. However, hydropower dams have adverse ecological impacts because migrating fish may be injured or killed when they pass through hydroturbines. In the Columbia and Snake River basins, dam operators and engineers are required to make those hydroelectric facilities more fish-friendly through changes in hydroturbine design and operation after fish population declines and the subsequent listing of several species of Pacific salmon under the Endangered Species Act of 1973. Public Utility District No. 2 of Grant County, Washington, requested authorization from the Federal Energy Regulatory Commission tomore » replace the ten turbines at Wanapum Dam with advanced hydropower turbines designed to improve survival for fish passing through the turbines while improving operation efficiency and increasing power generation. As an additional measure to the primary metric of direct injury and mortality rates of juvenile Chinook salmon using balloon tag-recapture methodology, this study used an autonomous sensor device - the Sensor Fish - to provide insight into the specific hydraulic conditions and physical stresses experienced by the fish as well as the specific causes of fish biological response. We found that the new hydroturbine blade shape and the corresponding reduction of turbulence in the advanced hydropower turbine were effective in meeting the objectives of improving fish survival while enhancing operational efficiency of the dam. The frequency of severe events based on Sensor Fish pressure and acceleration measurements showed trends similar to those of fish survival determined by the balloon tag-recapture methodology. In addition, the new turbine provided a better pressure and rate of pressure change environment for fish passage. Altogether, the Sensor Fish data indicated that the advanced hydroturbine design improved passage of juvenile salmon at Wanapum Dam.« less

  12. 75 FR 13527 - Muskingum Valley Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-22

    ... the feasibility of the Paint Creek Dam Project No. 13633, to be located at the existing Paint Creek Dam on Paint Creek, in Highland County, Ohio. The Paint Creek Dam is owned and operated by the U.S.... Applicant Contact: Randall Smith, 4950 Frazeysburg Road, Zanesville, OH 43701, (740) 891-5424. [[Page 13528...

  13. 75 FR 15458 - Request for Small Reclamation Projects Act Loan To Construct Narrows Dam in Sanpete County, UT

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... construction by SWCD of the proposed Narrows Dam and reservoir, a non-Federal project to be located on... conditions in the affected areas without further development and assumes that irrigation operations would... construction of the 17,000 acre-foot Narrows Dam and reservoir on Gooseberry Creek, pipelines to deliver the...

  14. The Effects of Dams on Downstream Channel Characteristics in Pennsylvania and Maryland: Assessing the Potential Consequences of Dam Removal

    NASA Astrophysics Data System (ADS)

    Skalak, K. J.; Pizzuto, J. E.; Jenkins, P.

    2003-12-01

    The potential downstream effects of dam removal were assessed on fifteen sites of varying dam size and characteristics in Pennsylvania and Maryland. The dams ranged in size from a 30 cm high fish weir to a water supply dam 57 m high. Stream order ranged from 1 to 4. The dams are located in watersheds with varying degrees of human disturbance and urbanization. The dams are also operated differently, with significant consequences for hydraulic residence time and downstream flow variability. Most streams were alluvial, but 6 of the reaches were clearly bedrock channels. We hypothesize that the channel upstream, which is unaffected by the dam, will provide an accurate model for the channel downstream of the dam long after dam removal. Therefore, reaches upstream and downstream of the dam were compared to determine the effects of the dam as well as the condition of the stream that will ultimately develop decades after dam removal. Surprisingly, the dams had no consistent influence on channel morphology. However, the percentage of sand is significantly lower downstream than upstream: the mean % sand downstream is 11.47%, while the mean % sand upstream is 21.39%. The coarser fractions of the bed, as represented by the 84th percentile grain diameter, are unaffected by the presence of the dam. These results imply that decades after dam removal, the percentage of sand on the bed will increase, but the coarse fraction of the bed will remain relatively unchanged.

  15. 76 FR 82320 - Extension of Public Scoping Period for the Draft Environmental Impact Statement for Adoption of a...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-30

    ... Management Plan for the Operation of Glen Canyon Dam AGENCY: Bureau of Reclamation and National Park Service... Impact Statement (EIS) for Adoption of a Long-term Experimental and Management Plan (LTEMP) for the Operation of Glen Canyon Dam to January 31, 2012. The Notice to Solicit Comments and Hold Public Scoping...

  16. Ecological consequences of hydropower development in Central America: Impacts of small dams and water diversion on neotropical stream fish assemblages

    USGS Publications Warehouse

    Anderson, Elizabeth P.; Freeman, Mary C.; Pringle, C.M.

    2006-01-01

    Small dams for hydropower have caused widespread alteration of Central American rivers, yet much of recent development has gone undocumented by scientists and conservationists. We examined the ecological effects of a small hydropower plant (Dona Julia Hydroelectric Center) on two low-order streams (the Puerto Viejo River and Quebradon stream) draining a mountainous area of Costa Rica. Operation of the Dona Julia plant has dewatered these streams, reducing discharge to ~ 10% of average annual flow. This study compared fish assemblage composition and aquatic habitat upstream and downstream of diversion dams on two streams and along a ~ 4 km dewatered reach of the Puerto Viejo River in an attempt to evaluate current instream flow recommendations for regulated Costa Rican streams. Our results indicated that fish assemblages directly upstream and downstream of the dam on the third order Puerto Viejo River were dissimilar, suggesting that the small dam (< 15 in high) hindered movement of fishes. Along the ~ 4 km dewatered reach of the Puerto Viejo River, species count increased with downstream distance from the dam. However, estimated species richness and overall fish abundance were not significantly correlated with downstream distance from the dam. Our results suggested that effects of stream dewatering may be most pronounced for a subset of species with more complex reproductive requirements, classified as equilibrium-type species based on their life-history. In the absence of changes to current operations, we expect that fish assemblages in the Puerto Viejo River will be increasingly dominated by opportunistic-type, colonizing fish species. Operations of many other small hydropower plants in Costa Rica and other parts of Central America mirror those of Doha Julia; the methods and results of this study may be applicable to some of those projects.

  17. Impacts of Water Levels on Breeding Canada Geese and Methods for Mitigation and Management in the Southern Flathead Valley, Montana, 1983-1987 Final Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mackey, Dennis L.; Gregory, Shari K.; Matthews, William C. Jr.

    Kerr Hydroelectric Dam is located at the south end of Flathead Lake, controls water levels on the lake and the Flathead River below the dam, and is currently operated as a load control facility. Current operation of Kerr Dam creates the greatest yearly water level fluctuations on both the lake and river during the Canada goose (Branta canadensis moffitti) brood and nesting period. Data collected from 1980-1982 indicated that goose nest numbers on the river were lower than during the 1950's, and that brood habitat on the lake may be limiting the goose population there. Our study was conducted frommore » 1983-1987 to determine the effects of Kerr Dam operation on Canada goose populations and habitat on the south half of Flathead Lake and the Flathead River, and to formulate management and mitigation recommendations. Nesting geese on the river appeared to be negatively affected by a lack of nest sites free from predators, and responded to available artificial nest structures with an increase in nest numbers and nesting success. Under current dam operation, river channel depths and widths do not discourage access to nesting islands by mammalian predators during some years and high predation on ground nests occurs. Intensively used brood areas on the lake and river were identified and described. Brood habitat on the lake was lower in quality and quantity than on the river due to dam operations. Gosling mortality on the lake was high, almost 2 times higher than on the river. Lake broods expended more energy obtaining food than river broods. Losses of brood habitat in the form of wet meadow marshes were documented and mitigation options developed. Management/mitigation alternatives and monitoring methods for nesting and brooding geese were identified.« less

  18. The Influence of Dams on Malaria Transmission in Sub-Saharan Africa.

    PubMed

    Kibret, Solomon; Wilson, G Glenn; Ryder, Darren; Tekie, Habte; Petros, Beyene

    2017-06-01

    The construction of dams in sub-Saharan Africa is pivotal for food security and alleviating poverty in the region. However, the unintended adverse public health implications of extending the spatial distribution of water infrastructure are poorly documented and may minimize the intended benefits of securing water supplies. This paper reviews existing studies on the influence of dams on the spatial distribution of malaria parasites and vectors in sub-Saharan Africa. Common themes emerging from the literature were that dams intensified malaria transmission in semi-arid and highland areas with unstable malaria transmission but had little or no impact in areas with perennial transmission. Differences in the impacts of dams resulted from the types and characteristics of malaria vectors and their breeding habitats in different settings of sub-Saharan Africa. A higher abundance of a less anthropophilic Anopheles arabiensis than a highly efficient vector A. gambiae explains why dams did not increase malaria in stable areas. In unstable areas where transmission is limited by availability of water bodies for vector breeding, dams generally increase malaria by providing breeding habitats for prominent malaria vector species. Integrated vector control measures that include reservoir management, coupled with conventional malaria control strategies, could optimize a reduction of the risk of malaria transmission around dams in the region.

  19. Dams on Mekong tributaries as significant contributors of hydrological alterations to the Tonle Sap Floodplain in Cambodia

    NASA Astrophysics Data System (ADS)

    Arias, M. E.; Piman, T.; Lauri, H.; Cochrane, T. A.; Kummu, M.

    2014-12-01

    River tributaries have a key role in the biophysical functioning of the Mekong Basin. Of particular interest are the Sesan, Srepok, and Sekong (3S) rivers, which contribute nearly a quarter of the total Mekong discharge. Forty two dams are proposed in the 3S, and once completed they will exceed the active storage of China's large dam cascade in the Upper Mekong. Given their proximity to the Lower Mekong floodplains, the 3S dams could alter the flood-pulse hydrology driving the productivity of downstream ecosystems. Therefore, the main objective of this study was to quantify how hydropower development in the 3S, together with definite future (DF) plans for infrastructure development through the basin, would alter the hydrology of the Tonle Sap's Floodplain, the largest wetland in the Mekong and home to one of the most productive inland fisheries in the world. We coupled results from four numerical models representing the basin's surface hydrology, water resources development, and floodplain hydrodynamics. The scale of alterations caused by hydropower in the 3S was compared with the basin's DF scenario driven by the Upper Mekong dam cascade. The DF or the 3S development scenarios could independently increase Tonle Sap's 30-day minimum water levels by 30 ± 5 cm and decrease annual water level fall rates by 0.30 ± 0.05 cm day-1. When analyzed together (DF + 3S), these scenarios are likely to eliminate all baseline conditions (1986-2000) of extreme low water levels, a particularly important component of Tonle Sap's environmental flows. Given the ongoing trends and large economic incentives in the hydropower business in the region, there is a high possibility that most of the 3S hydropower potential will be exploited and that dams will be built even in locations where there is a high risk of ecological disruption. Hence, retrofitting current designs and operations to promote sustainable hydropower practices that optimize multiple river services - rather than just maximize hydropower generation - appear to be the most feasible alternative to mitigate hydropower-related disruptions in the Mekong.

  20. Dams on Mekong tributaries as significant contributors of hydrological alterations to the Tonle Sap Floodplain in Cambodia

    NASA Astrophysics Data System (ADS)

    Arias, M. E.; Piman, T.; Lauri, H.; Cochrane, T. A.; Kummu, M.

    2014-02-01

    River tributaries have a key role in the biophysical functioning of the Mekong Basin. Of particular attention are the Sesan, Srepok, and Sekong (3S) rivers, which contribute nearly a quarter of the total Mekong discharge. Forty two dams are proposed in the 3S, and once completed they will exceed the active storage of China's large dam cascade in the upper Mekong. Given their proximity to the lower Mekong floodplains, the 3S dams could alter the flood-pulse hydrology driving the productivity of downstream ecosystems. Therefore, the main objective of this study was to quantify how hydropower development in the 3S would alter the hydrology of the Tonle Sap floodplain, the largest wetland in the Mekong and home to one of the most productive inland fisheries in the world. We coupled results from four numerical models representing the basin's surface hydrology, water resources development, and floodplain hydrodynamics. The scale of alterations caused by hydropower in the 3S was compared with the basin's definite future development scenario (DF) driven by the upper Mekong dam cascade. The DF or the 3S development scenarios could independently increase Tonle Sap's 30 day minimum water levels by 30 ± 5 cm and decrease annual water level fall rates by 0.30 ± 0.05 cm d-2. When analyzed together (DF + 3S), these scenarios are likely to eliminate all baseline conditions (1986-2000) of extreme low water levels, a particularly important component of Tonle Sap's environmental flows. Given the ongoing trends and large economic incentives in the hydropower business in the region, there is a high possibility that most of the 3S hydropower potential will actually be exploited and that dams would be built even in locations where there is a high risk of ecological disruptions. Hence, retrofitting current designs and operations to promote sustainable hydropower practices that optimize multiple river services - rather than just maximize hydropower generation - appear to be the most feasible alternative to mitigate hydropower-related disruptions in the Mekong.

  1. Water resources planning under climate change: Assessing the robustness of real options for the Blue Nile

    NASA Astrophysics Data System (ADS)

    Jeuland, Marc; Whittington, Dale

    2014-03-01

    This article presents a methodology for planning new water resources infrastructure investments and operating strategies in a world of climate change uncertainty. It combines a real options (e.g., options to defer, expand, contract, abandon, switch use, or otherwise alter a capital investment) approach with principles drawn from robust decision-making (RDM). RDM comprises a class of methods that are used to identify investment strategies that perform relatively well, compared to the alternatives, across a wide range of plausible future scenarios. Our proposed framework relies on a simulation model that includes linkages between climate change and system hydrology, combined with sensitivity analyses that explore how economic outcomes of investments in new dams vary with forecasts of changing runoff and other uncertainties. To demonstrate the framework, we consider the case of new multipurpose dams along the Blue Nile in Ethiopia. We model flexibility in design and operating decisions—the selection, sizing, and sequencing of new dams, and reservoir operating rules. Results show that there is no single investment plan that performs best across a range of plausible future runoff conditions. The decision-analytic framework is then used to identify dam configurations that are both robust to poor outcomes and sufficiently flexible to capture high upside benefits if favorable future climate and hydrological conditions should arise. The approach could be extended to explore design and operating features of development and adaptation projects other than dams.

  2. How Physical Processes are Informing River Management Actions at Marble Bluff Dam, Truckee River, Nevada

    NASA Astrophysics Data System (ADS)

    Bountry, J.; Godaire, J.; Bradley, D. N.

    2017-12-01

    At the terminus of the Truckee River into Pyramid Lake (Nevada, USA), upstream river management actions have dramatically reshaped the river landscape, posing significant challenges for the management of endangered aquatic species and maintenance of existing infrastructure. Within the last 100 years, upstream water withdrawal for human uses has resulted in a rapid lowering of Pyramid Lake which initiated up to 90 ft of channel incision. In 1976 Marble Bluff Dam was constructed to halt the upstream progression of channel incision and protect upstream agricultural lands, tribal resources, and infrastructure. Since construction an additional 40 ft of lake lowering and subsequent channel lowering now poses a potential risk to the structural integrity of the dam. The dynamic downstream river combined with ongoing reservoir sedimentation pose challenges to fish passage facilities that enable migration of numerous endangered cui-ui and threatened Lahontan Cutthroat Trout (LCT) to upstream spawning areas each year. These facilities include a fish lock at the dam, a fish bypass channel which allows fish to avoid the shallow delta area during low lake levels, and a meandering channel constructed by the Nature Conservancy to connect the bypass channel to the receding Pyramid Lake. The reservoir formed by Marble Bluff Dam has completely filled with sediment which impacts fish passage facilities. The original operating manual for the dam recommends year-round flushing of sediment through radial gates, but this can no longer be accomplished. During critical fish migration periods in the spring operators must ensure fish entrance channels downstream of the dam are not buried with released sediment and fish are not trapped in a portion of the reservoir full of sediment that would risk sending them back over the dam. To help inform future reservoir sediment and infrastructure management strategies, we bracket a range of potential river responses to lake level lowering and floods using historical trends, current field data, and hydraulic and sediment transport models. We present options for adaptive management for dam and reservoir sediment operations that incorporates monitoring of river processes to inform annual implementation strategies along with long-term planning.

  3. Understanding Hydrological Regime Alterations Caused by dams: the Santiago River case in the Andean Region of the Amazon Basin.

    NASA Astrophysics Data System (ADS)

    Rosero-Lopez, D.; Flecker, A.; Walter, M. T.

    2016-12-01

    Water resources in South America have been clearly targeted as key sources for hydropower expansion over the next 30 years. Ecuador, among the most biologically diverse countries in the world, has the highest density of hydropower dams, either operational, under construction, or planned, in the Amazon Basin. Ecuador's ambitious plan to change its energy portfolio is conceived to satisfy the country's demand and to empower the country to be the region's first hydroelectric energy exporter. The Santiago watershed located in the southeast part of the country has 39 facilities either under construction or in operation. The Santiago River and its main tributaries (Zamora and Upano) are expected to be impounded by large dams over the next 10 years. In order to understand the magnitude and potential impacts of regional dam development on hydrological regimes, a 35-year historical data set of stream discharge was analyzed. We examined flow regimes for time series between the construction of each dam, starting with the oldest and largest built in 1982 up until the most recent dam built in 2005. Preliminary results indicate a systematic displacement in flow seasonality following post-dam compared to pre-dam conditions. There are also notable differences in the distributions of peaks and pulses in post-dam flows. The range of changes from these results shows that punctuated and cumulative impacts are related to the size of each new impoundment. These observations and their implications to the livelihoods, biota, and ecosystems services in the Santiago watershed need to be incorporated into a broader cost-benefit analysis of hydropower generation in the western Amazon Basin.

  4. Key Impact Factors on Dam Break Fatalities

    NASA Astrophysics Data System (ADS)

    Huang, D.; Yu, Z.; Song, Y.; Han, D.; Li, Y.

    2016-12-01

    Dam failures can lead to catastrophes on human society. However, there is a lack of research about dam break fatalities, especially on the key factors that affect fatalities. Based on the analysis of historical dam break cases, most studies have used the regression analysis to explore the correlation between those factors and fatalities, but without implementing optimization to find the dominating factors. In order to understand and reduce the risk of fatalities, this study has proposed a new method to select the impact factors on the fatality. It employs an improved ANN (Artificial Neural Network) combined with LOOCV (Leave-one-out cross-validation) and SFS (Stepwise Forward Selection) approach to explore the nonlinear relationship between impact factors and life losses. It not only considers the factors that have been widely used in the literature but also introduces new factors closely involved with fatalities. Dam break cases occurred in China from 1954 to 2013 are summarized, within which twenty-five cases are selected with a comprehensive coverage of geographic position and temporal variation. Twelve impact factors are taken into account as the inputs, i.e., severity of dam break flood (SF), population at risk (PR), public understanding of dam break (UB), warning time (TW), evacuation condition (EC), weather condition during dam break (WB), dam break mode (MB), water storage (SW), building vulnerability (VB), dam break time (TB), average distance from the affected area to the dam (DD) and preventive measures by government (PG).From those, three key factors of SF, MB and TB are chosen. The proposed method is able to extract the key factors, and the derived fatality model performs well in various types of dam break conditions.

  5. Beaver dams, hydrological thresholds, and controlled floods as a management tool in a desert riverine ecosystem, Bill Williams River, Arizona

    USGS Publications Warehouse

    Andersen, D.C.; Shafroth, P.B.

    2010-01-01

    Beaver convert lotic stream habitat to lentic through dam construction, and the process is reversed when a flood or other event causes dam failure. We investigated both processes on a regulated Sonoran Desert stream, using the criterion that average current velocity is < 0.2 m s-1 in a lentic reach. We estimated temporal change in the lotic:lentic stream length ratio by relating beaver pond length (determined by the upstream lentic-lotic boundary position) to dam size, and coupling that to the dam-size frequency distribution and repeated censuses of dams along the 58-km river. The ratio fell from 19:1 when no beaver dams were present to < 3:1 after 7 years of flows favourable for beaver. We investigated the dam failure-flood intensity relationship in three independent trials (experimental floods) featuring peak discharge ranging from 37 to 65 m3 s-1. Major damage (breach ??? 3-m wide) occurred at ??? 20% of monitored dams (n = 7-86) and a similar or higher proportion was moderately damaged. We detected neither a relationship between dam size and damage level nor a flood discharge threshold for initiating major damage. Dam constituent materials appeared to control the probability of major damage at low (attenuated) flood magnitude. We conclude that environmental flows prescribed to sustain desert riparian forest will also reduce beaver-created lentic habitat in a non-linear manner determined by both beaver dam and flood attributes. Consideration of both desirable and undesirable consequences of ecological engineering by beaver is important when optimizing environmental flows to meet ecological and socioeconomic goals. ?? 2010 John Wiley & Sons, Ltd.

  6. 7. Photographic copy of the original construction drawing, dated June ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photographic copy of the original construction drawing, dated June 1934, from the linens in possession of U.S. Army Engineers, Rock Island District, Clock Tower Building, Arsenal Island, Rock Island, Illinois. MISSISSIPPI RIVER, LOCK AND DAM NO. 15, LOCK OPERATOR'S SHELTER HOUSE, ELEVATIONS AND PLANS - Locks & Dam No. 15, Locks Operator's Shelter House, Arsenal Island, Upper Mississippi River, Rock Island, Rock Island County, IL

  7. 8. Photographic copy of the original construction drawing dated June ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Photographic copy of the original construction drawing dated June 1934, from the linens in possession of U.S. Army Engineers, Rock Island District, Clock Tower Building, Arsenal Island, Rock Island, Illinois. MISSISSIPPI RIVER, LOCK AND DAM NO. 15, LOCK OPERATOR'S SHELTER HOUSE, SECTIONS AND DETAILS - Locks & Dam No. 15, Locks Operator's Shelter House, Arsenal Island, Upper Mississippi River, Rock Island, Rock Island County, IL

  8. On the effect of operation of the hydropower plant on the water quality of Rapel reservoir, central Chile

    NASA Astrophysics Data System (ADS)

    Rossel, V.; De La Fuente, A.

    2013-12-01

    Eutrophication of lakes and reservoirs is a common problem in systems with high incoming loads of nutrients. The consequent algae bloom related to the eutrophication alters the water quality and generates an incompatibility with the tourist and recreational activities. This study is focused on Rapel reservoir: an old, dentritic and monomictic reservoir, located in central Chile (34°S, 71.6°W), that has experienced numerous algae bloom events in the past years produced by high loads of nutrients, sediments and metals. This reservoir was originally constructed in 1968 for hydropower generation without environmental restrictions on its operation. Rapel is part of Chile's Central Interconnected System (SIC), and is controlled by an independent system operator (ISO) that decides the optimal allocation of water by minimizing the SIC's operation cost. As a result of this framework, Rapel reservoir operates based on a hydropeaking scheme, thus producing energy few hours a day while zero outflows are observed the remaining hours, impacting on Rapel river located downstream the reservoir. However, previous research showed that this hydropeaking has important effects on the hydrodynamic of the reservoir as well. Particularly, it enhances vertical mixing nears the dam, and reduces horizontal dispersion. Furthermore, hydropeaking defines the outflows water temperature, and the temperature profile near the dam. As a consequence of this role of hydropeaking on the hydrodynamics and mixing of Rapel reservoir, it is expected to be a link between hydropeaking and water quality. The aim of the study is to evaluate the impact of the operation of hydropower plant on the water quality of Rapel reservoir, for which the reservoir system is modeled using the three dimensional hydrodynamic and water quality model ELCOM-CAEDYM. Field data to validate the results and to define boundary and initial conditions are available for the austral summer period of 2009-2010. Different scenarios of the hydropower plant outflows are obtained using an alternative of the ISO's economic optimization tool. A number of 20 simulations are conducted depending on the hydrological regime (dry, normal or wet) and on the presence or absence of an environmental flow. First of all, it was obtained that the hydropower plant operation depends on the hydrological regime, which produces changes in the storage volume, and on the environmental flow. Particularly, wet regime promotes high fluctuation on the storage, and the definition of an environmental flow reduces the outflow peaks.The numerical results show that there is a direct influence of hydropeaking on the water quality of Rapel reservoir, particularly in the area near the dam. This result is due to both changes in the storage volume, produced by different environmental flows and hydrological regime, and hydrodynamics and vertical mixing. The simulations also show that the introduction of an environmental flow downstream has an adverse impact on the internal quality of the reservoir, which is increased in the dry scenario. The study evidences the conflicting goals among environmental flow, SIC's operation costs and internal water quality of the reservoir.

  9. 43 CFR 418.23 - Diversion of Rock Dam Ditch water.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Operations and Management § 418.23 Diversion of Rock Dam Ditch water. Project water may be diverted directly... Lahontan Reservoir. Such diversions will require the prior written approval of the Bureau and be used in...

  10. 43 CFR 418.23 - Diversion of Rock Dam Ditch water.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Operations and Management § 418.23 Diversion of Rock Dam Ditch water. Project water may be diverted directly... Lahontan Reservoir. Such diversions will require the prior written approval of the Bureau and be used in...

  11. Are large-scale flow experiments informing the science and management of freshwater ecosystems?

    USGS Publications Warehouse

    Olden, Julian D.; Konrad, Christopher P.; Melis, Theodore S.; Kennard, Mark J.; Freeman, Mary C.; Mims, Meryl C.; Bray, Erin N.; Gido, Keith B.; Hemphill, Nina P.; Lytle, David A.; McMullen, Laura E.; Pyron, Mark; Robinson, Christopher T.; Schmidt, John C.; Williams, John G.

    2013-01-01

    Greater scientific knowledge, changing societal values, and legislative mandates have emphasized the importance of implementing large-scale flow experiments (FEs) downstream of dams. We provide the first global assessment of FEs to evaluate their success in advancing science and informing management decisions. Systematic review of 113 FEs across 20 countries revealed that clear articulation of experimental objectives, while not universally practiced, was crucial for achieving management outcomes and changing dam-operating policies. Furthermore, changes to dam operations were three times less likely when FEs were conducted primarily for scientific purposes. Despite the recognized importance of riverine flow regimes, four-fifths of FEs involved only discrete flow events. Over three-quarters of FEs documented both abiotic and biotic outcomes, but only one-third examined multiple taxonomic responses, thus limiting how FE results can inform holistic dam management. Future FEs will present new opportunities to advance scientifically credible water policies.

  12. Rubber dam isolation of cervical lesions. Part 1: Alternative techniques which avoid injury to the periodontium.

    PubMed

    Liebenberg, W H

    1994-01-01

    While it is arguable that the operative procedures depicted in this article could have been done equally well with alternative forms of isolation, it is indisputable that rubber dam provides for the most thorough 'isolation' in the comprehensive sense of the term. It allows for the finite control over peripheral variables such as access and controlled gingival retraction. This in turn permits meticulous execution of restorative procedures within the luxury of 'true four-handed dentistry'. Most operative procedures are done within the limitations of single handed dentistry as the other 'three hands' are involved with retraction, fluid evacuation and access control. The rubber dam is indeed indispensable and with the increased awareness of infection control it is conceivable that rubber dam isolation will continue to be associated with quality patient care. Part 2 of this article will detail the application of the 'Modified Gingival Retractor' in the isolation of cervical lesions.

  13. Thermal effects of dams in the Willamette River basin, Oregon

    USGS Publications Warehouse

    Rounds, Stewart A.

    2010-01-01

    Methods were developed to assess the effects of dams on streamflow and water temperature in the Willamette River and its major tributaries. These methods were used to estimate the flows and temperatures that would occur at 14 dam sites in the absence of upstream dams, and river models were applied to simulate downstream flows and temperatures under a no-dams scenario. The dams selected for this study include 13 dams built and operated by the U.S. Army Corps of Engineers (USACE) as part of the Willamette Project, and 1 dam on the Clackamas River owned and operated by Portland General Electric (PGE). Streamflows in the absence of upstream dams for 2001-02 were estimated for USACE sites on the basis of measured releases, changes in reservoir storage, a correction for evaporative losses, and an accounting of flow effects from upstream dams. For the PGE dam, no-project streamflows were derived from a previous modeling effort that was part of a dam-relicensing process. Without-dam streamflows were characterized by higher peak flows in winter and spring and much lower flows in late summer, as compared to with-dam measured flows. Without-dam water temperatures were estimated from measured temperatures upstream of the reservoirs (the USACE sites) or derived from no-project model results (the PGE site). When using upstream data to estimate without-dam temperatures at dam sites, a typical downstream warming rate based on historical data and downstream river models was applied over the distance from the measurement point to the dam site, but only for conditions when the temperature data indicated that warming might be expected. Regressions with measured temperatures from nearby or similar sites were used to extend the without-dam temperature estimates to the entire 2001-02 time period. Without-dam temperature estimates were characterized by a more natural seasonal pattern, with a maximum in July or August, in contrast to the measured patterns at many of the tall dam sites where the annual maximum temperature typically occurred in September or October. Without-dam temperatures also tended to have more daily variation than with-dam temperatures. Examination of the without-dam temperature estimates indicated that dam sites could be grouped according to the amount of streamflow derived from high-elevation, spring-fed, and snowmelt-driven areas high in the Cascade Mountains (Cougar, Big Cliff/Detroit, River Mill, and Hills Creek Dams: Group A), as opposed to flow primarily derived from lower-elevation rainfall-driven drainages (Group B). Annual maximum temperatures for Group A ranged from 15 to 20 degree(s)C, expressed as the 7-day average of the daily maximum (7dADM), whereas annual maximum 7dADM temperatures for Group B ranged from 21 to 25 degrees C. Because summertime stream temperature is at least somewhat dependent on the upstream water source, it was important when estimating without-dam temperatures to use correlations to sites with similar upstream characteristics. For that reason, it also is important to maintain long-term, year-round temperature measurement stations at representative sites in each of the Willamette River basin's physiographic regions. Streamflow and temperature estimates downstream of the major dam sites and throughout the Willamette River were generated using existing CE-QUAL-W2 flow and temperature models. These models, originally developed for the Willamette River water-temperature Total Maximum Daily Load process, required only a few modifications to allow them to run under the greatly reduced without-dam flow conditions. Model scenarios both with and without upstream dams were run. Results showed that Willamette River streamflow without upstream dams was reduced to levels much closer to historical pre-dam conditions, with annual minimum streamflows approximately one-half or less of dam-augmented levels. Thermal effects of the dams varied according to the time of year, from cooling in mid-summer to warm

  14. A Framework to Assess the Cumulative Hydrological Impacts of Dams on flow Regime

    NASA Astrophysics Data System (ADS)

    Wang, Y.; Wang, D.

    2016-12-01

    In this study we proposed a framework to assess the cumulative impact of dams on hydrological regime, and the impacts of the Three Gorges Dam on flow regime in Yangtze River were investigated with the framework. We reconstructed the unregulated flow series to compare with the regulated flow series in the same period. Eco-surplus and eco-deficit and the Indicators of Hydrologic Alteration parameters were used to examine the hydrological regime change. Among IHA parameters, Wilcoxon signed-rank test and Principal Components Analysis identified the representative indicators of hydrological alterations. Eco-surplus and eco-deficit showed that the reservoir also changed the seasonal regime of the flows in autumn and winter. Annual extreme flows and October flows changes lead to negative ecological implications downstream from the Three Gorges Dam. Ecological operation for the Three Gorges Dam is necessary to mitigate the negative effects on the river ecosystem in the middle reach of Yangtze River. The framework proposed here could be a robust method to assess the cumulative impacts of reservoir operation.

  15. Assessing the potential hydrological impact of the Gibe III Dam on Lake Turkana water level using multi-source satellite data

    USGS Publications Warehouse

    Velpuri, Naga Manohar; Senay, Gabriel B.

    2012-01-01

    Lake Turkana, the largest desert lake in the world, is fed by ungauged or poorly gauged river systems. To meet the demand of electricity in the East African region, Ethiopia is currently building the Gibe III hydroelectric dam on the Omo River, which supplies more than 80% of the inflows to Lake Turkana. On completion, the Gibe III dam will be the tallest dam in Africa with a height of 241 m. However, the nature of interactions and potential impacts of regulated inflows to Lake Turkana are not well understood due to its remote location and unavailability of reliable in-situ datasets. In this study, we used 12 years (1998–2009) of existing multi-source satellite and model-assimilated global weather data. We use calibrated multi-source satellite data-driven water balance model for Lake Turkana that takes into account model routed runoff, lake/reservoir evapotranspiration, direct rain on lakes/reservoirs and releases from the dam to compute lake water levels. The model evaluates the impact of Gibe III dam using three different approaches such as (a historical approach, a knowledge-based approach, and a nonparametric bootstrap resampling approach) to generate rainfall-runoff scenarios. All the approaches provided comparable and consistent results. Model results indicated that the hydrological impact of the dam on Lake Turkana would vary with the magnitude and distribution of rainfall post-dam commencement. On average, the reservoir would take up to 8–10 months, after commencement, to reach a minimum operation level of 201 m depth of water. During the dam filling period, the lake level would drop up to 2 m (95% confidence) compared to the lake level modelled without the dam. The lake level variability caused by regulated inflows after the dam commissioning were found to be within the natural variability of the lake of 4.8 m. Moreover, modelling results indicated that the hydrological impact of the Gibe III dam would depend on the initial lake level at the time of dam commencement. Areas along the Lake Turkana shoreline that are vulnerable to fluctuations in lake levels were also identified. This study demonstrates the effectiveness of using existing multi-source satellite data in a basic modeling framework to assess the potential hydrological impact of an upstream dam on a terminal downstream lake. The results obtained from this study could also be used to evaluate alternate dam-filling scenarios and assess the potential impact of the dam on Lake Turkana under different operational strategies.

  16. Evaluation of Water Year 2011 Glen Canyon Dam Flow Release Scenarios on Downstream Sand Storage along the Colorado River in Arizona

    USGS Publications Warehouse

    Wright, Scott A.; Grams, Paul E.

    2010-01-01

    This report describes numerical modeling simulations of sand transport and sand budgets for reaches of the Colorado River below Glen Canyon Dam. Two hypothetical Water Year 2011 annual release volumes were each evaluated with six hypothetical operational scenarios. The six operational scenarios include the current operation, scenarios with modifications to the monthly distribution of releases, and scenarios with modifications to daily flow fluctuations. Uncertainties in model predictions were evaluated by conducting simulations with error estimates for tributary inputs and mainstem transport rates. The modeling results illustrate the dependence of sand transport rates and sand budgets on the annual release volumes as well as the within year operating rules. The six operational scenarios were ranked with respect to the predicted annual sand budgets for Marble Canyon and eastern Grand Canyon reaches. While the actual WY 2011 annual release volume and levels of tributary inputs are unknown, the hypothetical conditions simulated and reported herein provide reasonable comparisons between the operational scenarios, in a relative sense, that may be used by decision makers within the Glen Canyon Dam Adaptive Management Program.

  17. Hydrological impact of high-density small dams in a humid catchment, Southeast China

    NASA Astrophysics Data System (ADS)

    Lu, W.; Lei, H.; Yang, D.

    2017-12-01

    The Jiulong River basin is a humid catchment with a drainage area of 14,741 km2; however, it has over 1000 hydropower stations within it. Such catchment with high-density small dams is scarce in China. Yet few is known about the impact of high-density small dams on streamflow changes. To what extent the large number of dams alters the hydrologic patterns is a fundamental scientific issue for water resources management, flood control, and aquatic ecological environment protection. Firstly, trend and change point analyses are applied to determine the characteristics of inter-annual streamflow. Based on the detected change point, the study period is divided into two study periods, the ``natural'' and ``disturbed'' periods. Then, a geomorphology-based hydrological model (GBHM) and the fixing-changing method are adopted to evaluate the relative contributions of climate variations and damming to the changes in streamflow at each temporal scale (i.e., from daily, monthly to annual). Based on the simulated natural streamflow, the impact of dam construction on hydrologic alteration and aquatic ecological environment will be evaluated. The hydrologic signatures that will be investigated include flood peak, seasonality of streamflow, and the inter-annual variability of streamflow. In particular, the impacts of damming on aquatic ecological environment will be investigated using eco-flow metrics and indicators of hydrologic alteration (IHA) which contains 33 individual streamflow statistics that are closely related to aquatic ecosystem. The results of this study expect to provide a reference for reservoir operation considering both ecological and economic benefits of such operations in the catchment with high-density dams.

  18. A Study of the Impact of Dams on Streamflow and Sediment Retention in the Mekong River Basin

    NASA Astrophysics Data System (ADS)

    Munroe, T.; Anderson, E.; Markert, K. N.; Griffin, R.

    2017-12-01

    Dam construction in the Mekong Basin has many cascading effects on the ecology, economy, and hydrology of the surrounding region. Current studies that assess the hydrological impact of dams in the region focus on only one or a small subset (<10) of dams. The focus of this study is to utilize the Soil Water Assessment Tool (SWAT), a rainfall-runoff hydrologic model to determine change in streamflow and sedimentation in the Mekong Basin before and after the construction of dams. This study uses land cover land use and reservoir datasets created by the NASA SERVIR-Mekong Regional Land Cover Monitoring System and Dam Inundation Mapping Tool as inputs into the model. The study also builds on the capabilities of the SWAT model by using the sediment trapping efficiency (STE) equation from Brune (1953), rewritten by Kummu (2007), to calculate STE of dams and estimate change in sediment concentration downstream. The outputs from this study can be used to inform dam operation policies, study the correlation between dams and delta subsidence, and study the impact of dams on river fisheries, which are all pressing issues in the Mekong region.

  19. Optimum Antenna Configuration for Maximizing Access Point Range of an IEEE 802.11 Wireless Mesh Network in Support of Multi-Mission Operations Relative to Hastily Formed Scalable Deployments

    DTIC Science & Technology

    2007-09-01

    Configuration Consideration ...........................54 C. MAE NGAT DAM, CHIANG MAI , THAILAND, FIELD EXPERIMENT...2006 802.11 Network Topology Mae Ngat Dam, Chiang Mai , Thailand.......................39 Figure 31. View of COASTS 2006 802.11 Topology...Requirements (Background From Google Earth).....62 Figure 44. Mae Ngat Dam, Chiang Mai , Thailand (From Google Earth

  20. Effect of a seasonal diffuse pollution migration on natural organic matter behavior in a stratified dam reservoir.

    PubMed

    Yu, Soon Ju; Lee, Jae Yil; Ha, Sung Ryong

    2010-01-01

    This article aims to describe the influence of diffuse pollution on the temporal and spatial characteristics of natural organic matter (NOM) in a stratified dam reservoir, the Daecheong Dam, on the basis of intensive observation results and the dynamic water quality simulation using CE-QUAL-W2. Turbidity is regarded as a comprehensive representation of allochothonous organic matter from diffuse sources in storm season because the turbidity concentration showed reasonable significance in a statistical correlation with the UV absorbance at 254 nm and total phosphorus. CE-QUAL-W2 simulation results showed good consistency with the observed data in terms of dissolved organic matter (DOM) including refractory dissolved organic carbon (RDOC) and labile DOC and also well explained the internal movement of constituents and stratification phenomenon in the reservoir. Instead turbidity and NOM were related well in the upper region of the reservoir according to flow distance, gradually as changing to dissolved form of organic matter, RDOM affected organic matter concentration of reservoir water quality compared to turbidity. To control the increase of soluble organic matters in the dam reservoir, appropriate dam water discharge gate operation provided effective measurement. Because of the gate operation let avoid the accumulation of organic matter within a dam reservoir by shorten of turbid regime retention time.

  1. Space geodetic monitoring of engineered structures: The ongoing destabilization of the Mosul dam, Iraq.

    PubMed

    Milillo, Pietro; Bürgmann, Roland; Lundgren, Paul; Salzer, Jacqueline; Perissin, Daniele; Fielding, Eric; Biondi, Filippo; Milillo, Giovanni

    2016-12-06

    We present a detailed survey of the ongoing destabilization process of the Mosul dam. The dam is located on the Tigris river and is the biggest hydraulic structure in Iraq. From a geological point of view the dam foundation is poor due to a site geology formed by alternating strata of highly soluble materials including gypsum, anhydrite, marl and limestone. Here we present the first multi-sensor cumulative deformation map for the dam generated from space-based interferometric synthetic aperture radar measurements from the Italian constellation COSMO-SkyMed and the European sensor Sentinel-1a over the period 2014-2016 that we compare to an older dataset spanning 2004-2010 acquired with the European Envisat satellite. We found that deformation was rapid during 2004-2010, slowed in 2012-2014 and increased since August 2014 when grouting operations stopped due to the temporary capture of the dam by the self proclaimed Islamic State. We model the inferred deformation using a Markov chain Monte Carlo approach to solve for change in volume for simple tensile dislocations. Results from recent and historical geodetic datasets suggests that the volume dissolution rate remains constant when the equivalent volume of total concrete injected during re-grouting operations is included in the calculations.

  2. Space geodetic monitoring of engineered structures: The ongoing destabilization of the Mosul dam, Iraq

    PubMed Central

    Milillo, Pietro; Bürgmann, Roland; Lundgren, Paul; Salzer, Jacqueline; Perissin, Daniele; Fielding, Eric; Biondi, Filippo; Milillo, Giovanni

    2016-01-01

    We present a detailed survey of the ongoing destabilization process of the Mosul dam. The dam is located on the Tigris river and is the biggest hydraulic structure in Iraq. From a geological point of view the dam foundation is poor due to a site geology formed by alternating strata of highly soluble materials including gypsum, anhydrite, marl and limestone. Here we present the first multi-sensor cumulative deformation map for the dam generated from space-based interferometric synthetic aperture radar measurements from the Italian constellation COSMO-SkyMed and the European sensor Sentinel-1a over the period 2014–2016 that we compare to an older dataset spanning 2004–2010 acquired with the European Envisat satellite. We found that deformation was rapid during 2004–2010, slowed in 2012–2014 and increased since August 2014 when grouting operations stopped due to the temporary capture of the dam by the self proclaimed Islamic State. We model the inferred deformation using a Markov chain Monte Carlo approach to solve for change in volume for simple tensile dislocations. Results from recent and historical geodetic datasets suggests that the volume dissolution rate remains constant when the equivalent volume of total concrete injected during re-grouting operations is included in the calculations. PMID:27922128

  3. Space geodetic monitoring of engineered structures: The ongoing destabilization of the Mosul dam, Iraq

    NASA Astrophysics Data System (ADS)

    Milillo, Pietro; Bürgmann, Roland; Lundgren, Paul; Salzer, Jacqueline; Perissin, Daniele; Fielding, Eric; Biondi, Filippo; Milillo, Giovanni

    2016-12-01

    We present a detailed survey of the ongoing destabilization process of the Mosul dam. The dam is located on the Tigris river and is the biggest hydraulic structure in Iraq. From a geological point of view the dam foundation is poor due to a site geology formed by alternating strata of highly soluble materials including gypsum, anhydrite, marl and limestone. Here we present the first multi-sensor cumulative deformation map for the dam generated from space-based interferometric synthetic aperture radar measurements from the Italian constellation COSMO-SkyMed and the European sensor Sentinel-1a over the period 2014-2016 that we compare to an older dataset spanning 2004-2010 acquired with the European Envisat satellite. We found that deformation was rapid during 2004-2010, slowed in 2012-2014 and increased since August 2014 when grouting operations stopped due to the temporary capture of the dam by the self proclaimed Islamic State. We model the inferred deformation using a Markov chain Monte Carlo approach to solve for change in volume for simple tensile dislocations. Results from recent and historical geodetic datasets suggests that the volume dissolution rate remains constant when the equivalent volume of total concrete injected during re-grouting operations is included in the calculations.

  4. Reservoir system expansion scheduling under conflicting interests - A Blue Nile application

    NASA Astrophysics Data System (ADS)

    Geressu, Robel; Harou, Julien

    2017-04-01

    New water resource developments are facing increasing resistance due to their real and perceived potential to affect existing systems' performance negatively. Hence, scheduling new dams in multi-reservoir systems requires considering conflicting performance objectives to minimize impacts, create consensus among wider stakeholder groups and avoid conflict. However, because of the large number of alternative expansion schedules, planning approaches often rely on simplifying assumptions such as the appropriate gap between expansion stages or less flexibility in reservoir release rules than what is possible. In this study, we investigate the extent to which these assumptions could limit our ability to find better performing alternatives. We apply a many-objective sequencing approach to the proposed Blue Nile hydropower reservoir system in Ethiopia to find best investment schedules and operating rules that maximize long-term discounted net benefits, downstream releases and energy generation during reservoir filling periods. The system is optimized using 30 realizations of stochastically generated streamflow data, statistically resembling the historical flow. Results take the form of Pareto-optimal trade-offs where each point on the curve or surface represents a combination of new reservoirs, their implementation dates and operating rules. Results show a significant relationship between detail in operating rule design (i.e., changing operating rules as the multi-reservoir expansion progresses) and the system performance. For the Blue Nile, failure to optimize operating rules in sufficient detail could result in underestimation of the net worth of the proposed investments by up to 6 billion USD if a development option with low downstream impact (slow filling of the reservoirs) is to be implemented.

  5. Detail of exciter turbine showing shaft, scroll case, servomotor and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Detail of exciter turbine showing shaft, scroll case, servo-motor and operating ring (left foreground) and hand wheel for butterfly valve (right background) - Morony Hydroelectric Facility, Dam and Powerhouse, Morony Dam Road, Great Falls, Cascade County, MT

  6. Hungry Horse Dam Fisheries Mitigation; Kokanee Stocking and Monitoring in Flathead Lake, 1995 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fredenberg, Wade; Carty, Daniel; Cavigli, Jon

    1996-06-01

    The operation of Hungry Horse Dam on the South Fork-of the Flathead River reduced the reproductive success of kokanee (Oncorhynchus nerka) spawning in the Flathead River. Montana Fish, Wildlife and Parks (MFWP) and the Confederated Salish and Kootenai Tribes (CSKT) authored a mitigation plan to offset those losses. The mitigation goal, stated in the Fisheries Mitigation Plan for Losses Attributed to the Construction and Operation of Hungry Horse Dam, is to: {open_quotes}Replace lost annual production of 100,000 kokanee adults, initially through hatchery production and pen rearing in Flathead Lake, partially replacing lost forage for lake trout (Salvelinus namaycush) in Flatheadmore » Lake.{close_quotes}« less

  7. The U.S. Military’s Reliance on Bottled Water During Military Operations

    DTIC Science & Technology

    2011-06-17

    15 Tony Perry, "Afghan Dam a Monument to US Challenges," Daily Press Newspaper, (September 7...Effects on Operations. Santa Monica, CA: Arroyo Center, RAND Corporation, 2005. Peltz, Eric, Marc L Robbins , Kenneth J Girardini, Rick Eden, John M...Defense Technical Information Center, 2005. Perry, Tony . "Afghan Dam a Monument to US Challenges." Daily Press Newspaper, September 07, 2010. Rogers

  8. The Role of Eolian Sediment in the Preservation of Archeologic Sites Along the Colorado River Corridor in Grand Canyon National Park, Arizona

    USGS Publications Warehouse

    Draut, Amy E.; Rubin, David M.

    2008-01-01

    Since the closure of Glen Canyon Dam in 1963, the natural hydrologic and sedimentary systems along the Colorado River in the Grand Canyon reach have changed substantially (see, for example, Andrews, 1986; Johnson and Carothers, 1987; Webb and others, 1999b; Rubin and others, 2002; Topping and others, 2003; Wright and others, 2005; Hazel and others, 2006b). The dam has reduced the fluvial sediment supply at the upstream boundary of Grand Canyon National Park by about 95 percent. Regulation of river discharge by dam operations has important implications for the storage and redistribution of sediment in the Colorado River corridor. In the absence of floods, sediment is not deposited at elevations that regularly received sediment before dam closure. Riparian vegetation has colonized areas at lower elevations than in predam time when annual floods removed young vegetation (Turner and Karpiscak, 1980). Together, these factors have caused a systemwide decrease in the size and number of subaerially exposed fluvial sand deposits since the 1960s, punctuated by episodic aggradation during the exceptional high-flow intervals in 1983-84, 1996, and 2004 and by sediment input from occasional tributary floods (Beus and others, 1985; Schmidt and Graf, 1987; Kearsley and others, 1994; Hazel and others, 1999; Schmidt and others, 2004; Wright and others, 2005). When the Bureau of Reclamation sponsored the creation of the Glen Canyon Environmental Studies (GCES) research initiative in 1982, research objectives included physical and biologic resources, whereas the effects of dam operations on cultural resources were not addressed (Fairley and others, 1994; Fairley, 2003). In the early 1980s, it was widely believed that because few archeologic sites were preserved within the river's annual-flood zone, cultural features would not be greatly affected by dam operations. Recent studies, however, indicate that alterations in the flow and sediment load of the Colorado River by Glen Canyon Dam operations may affect archeologic sites within the river corridor, even above the annual flood limit (Hereford and others, 1993, Yeatts, 1996, 1997; Thompson and Potochnik, 2000; Draut and others, 2005). (The annual-flood zone is defined here by the mean annual predam flood of 2,410 m3/s; the 'predam flood limit', the highest elevation at which fluvial deposits are present locally, was approximately equivalent to a rare, major flood of 8,500 m3/s; Topping and others, 2003.) Of about 500 archeologic sites documented between Glen Canyon Dam and Separation Canyon (255 river miles), more than 330 are considered to be within the area of potential effect (APE) of dam operations (Fairley and others, 1994; Neal and others, 2000; Fairley, 2005). The APE was designated by the National Park Service (NPS) to include the area below the peak stage of the 1884 flood; though previously believed to have reached 8,490 m3/s, this flood was shown by Topping and others (2003) to have peaked at 5,940 m3/s. Archeologic research and monitoring in Grand Canyon National Park focus increasingly on the potential effects of Glen Canyon Dam operations on the landscape in which these sites exist. Many archeologic sites in or on sedimentary deposits are being eroded, owing to eolian deflation and gully incision (Leap and others, 2000; Neal and others, 2000; Fairley, 2003, 2005). Hereford and others (1993) first suggested that gully incision of sedimentary deposits, and the base level to which small drainage systems respond, were linked to dam operations; they hypothesized that pronounced arroyo incision, which occurs during rainfall runoff, was caused by lowering of the effective base level at the mouths of ephemeral drainages to meet the new postdam elevation of high-flow sediment deposition, about 3 to 4 m below the lowest predam alluvial terraces. Thompson and Potochnik (2000) modified that hypothesis to include the restorative effects of fluvial deposition in the mouths of gullies and ar

  9. Effects of dams in river networks on fish assemblages in non-impoundment sections of rivers in Michigan and Wisconsin, USA

    USGS Publications Warehouse

    Stewart, Jana S.; Lizhu Wang,; Infante, Dana M.; Lyons, John D.; Arthur Cooper,

    2011-01-01

    Regional assessment of cumulative impacts of dams on riverine fish assemblages provides resource managers essential information for dam operation, potential dam removal, river health assessment and overall ecosystem management. Such an assessment is challenging because characteristics of fish assemblages are not only affected by dams, but also influenced by natural variation and human-induced modification (in addition to dams) in thermal and flow regimes, physicochemical habitats and biological assemblages. This study evaluated the impacts of dams on river fish assemblages in the non-impoundment sections of rivers in the states of Michigan and Wisconsin using multiple fish assemblage indicators and multiple approaches to distinguish the influences of dams from those of other natural and human-induced factors. We found that environmental factors that influence fish assemblages in addition to dams should be incorporated when evaluating regional effects of dams on fish assemblages. Without considering such co-influential factors, the evaluation is inadequate and potentially misleading. The role of dams alone in determining fish assemblages at a regional spatial scale is relatively small (explained less than 20% of variance) compared with the other environmental factors, such as river size, flow and thermal regimes and land uses jointly. However, our results do demonstrate that downstream and upstream dams can substantially modify fish assemblages in the non-impoundment sections of rivers. After excluding river size and land-use influences, our results clearly demonstrate that dams have significant impacts on fish biotic-integrity and habitat-and-social-preference indicators. The influences of the upstream dams, downstream dams, distance to dams, and dam density differ among the fish indicators, which have different implications for maintaining river biotic integrity, protecting biodiversity and managing fisheries.

  10. Effects of dams in river networks on fish assemblages in non-impoundment sections of rivers in Michigan and Wisconsin, USA

    USGS Publications Warehouse

    Wang, L.; Infante, D.; Lyons, J.; Stewart, J.; Cooper, A.

    2011-01-01

    Regional assessment of cumulative impacts of dams on riverine fish assemblages provides resource managers essential information for dam operation, potential dam removal, river health assessment and overall ecosystem management. Such an assessment is challenging because characteristics of fish assemblages are not only affected by dams, but also influenced by natural variation and human-induced modification (in addition to dams) in thermal and flow regimes, physicochemical habitats and biological assemblages. This study evaluated the impacts of dams on river fish assemblages in the non-impoundment sections of rivers in the states of Michigan and Wisconsin using multiple fish assemblage indicators and multiple approaches to distinguish the influences of dams from those of other natural and human-induced factors. We found that environmental factors that influence fish assemblages in addition to dams should be incorporated when evaluating regional effects of dams on fish assemblages. Without considering such co-influential factors, the evaluation is inadequate and potentially misleading. The role of dams alone in determining fish assemblages at a regional spatial scale is relatively small (explained less than 20% of variance) compared with the other environmental factors, such as river size, flow and thermal regimes and land uses jointly. However, our results do demonstrate that downstream and upstream dams can substantially modify fish assemblages in the non-impoundment sections of rivers. After excluding river size and land-use influences, our results clearly demonstrate that dams have significant impacts on fish biotic-integrity and habitat-and-social-preference indicators. The influences of the upstream dams, downstream dams, distance to dams, and dam density differ among the fish indicators, which have different implications for maintaining river biotic integrity, protecting biodiversity and managing fisheries. ?? 2010 John Wiley & Sons, Ltd.

  11. Reducing the Impacts of Hydroelectric Dams on Juvenile Anadromous Fishes: Bioengineering Evaluations Using Acoustic Imaging in the Columbia River, USA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.; Ploskey, Gene R.; Hedgepeth, J.

    2008-07-29

    Dams impact the survival of juvenile anadromous fishes by obstructing migration corridors, lowering water quality, delaying migrations, and entraining fish in turbine discharge. To reduce these impacts, structural and operational modifications to dams— such as voluntary spill discharge, turbine intake guidance screens, and surface flow outlets—are instituted. Over the last six years, we have used acoustic imaging technology to evaluate the effects of these modifications on fish behavior, passage rates, entrainment zones, and fish/flow relationships at hydroelectric projects on the Columbia River. The imaging technique has evolved from studies documenting simple movement patterns to automated tracking of images to mergingmore » and analysis with concurrent hydraulic data. This chapter chronicles this evolution and shows how the information gleaned from the scientific evaluations has been applied to improve passage conditions for juvenile salmonids. We present data from Bonneville and The Dalles dams that document fish behavior and entrainment zones at sluiceway outlets (14 to 142 m3/s), fish passage rates through a gap at a turbine intake screen, and the relationship between fish swimming effort and hydraulic conditions. Dam operators and fisheries managers have applied these data to support decisions on operational and structural changes to the dams for the benefit of anadromous fish populations in the Columbia River basin.« less

  12. The effect of river damming on vegetation: is it always unfavourable? A case study from the River Tiber (Italy).

    PubMed

    Ceschin, Simona; Tombolini, Ilaria; Abati, Silverio; Zuccarello, Vincenzo

    2015-05-01

    River damming leads to strong hydromorphological alterations of the watercourse, consequently affecting river vegetation pattern. A multitemporal and spatial analysis of the dam effect on composition, structure and dynamic of the upstream vegetation was performed on Tiber River at Nazzano-dam (Rome). The main research questions were as follows: How does plant landscape vary over time and along the river? Where does the dam effect on vegetation end? How does naturalistic importance of the vegetation affected by damming change over time? Data collection was performed mapping the vegetation in aerial photos related to the period before (1944), during (1954) and after dam construction (1984, 2000). The plant landscape has significantly changed over time and along the river, particularly as a result of the dam construction (1953). The major vegetation changes have involved riparian forests and macrophytes. Dam effect on vegetation is evident up to 3 km, and gradually decreases along an attenuation zone for about another 3 km. Despite the fact that the damming has caused strong local hydromorphological modification of the river ecosystem transforming it into a sub-lacustrine habitat, it has also led to the formation of wetlands of considerable naturalistic importance. Indeed, in these man-made wetlands, optimal hydrological conditions have been created by favouring both the expansion of pre-existing riparian communities and the rooting of new aquatic communities, albeit typical of lacustrine ecosystems. Some of these plant communities have become an important food resource, refuge or nesting habitats for aquatic fauna, while others fall into category of Natura 2000 habitats. Therefore, river damming seems to have indirectly had a "favourable" effect for habitat conservation and local biodiversity.

  13. National Program for Inspection of Non-Federal Dams. Baker Floodwater Reservoir Site 11 (NH 00478), NHWRB No. 249.13, Merrimack River Basin, Wentworth, New Hampshire. Phase I Inspection Report.

    DTIC Science & Technology

    1979-07-01

    General 5-1 b. Design Data 5-1 c. Experience Data 5-1 d. Visual Observation 5-1 e. Overtopping Potential 5-1 f. Dam Failure Analysis 5-2 6. STRUCTURAL...the Soil Conservation Service, Durham, New Hampshire. The construction * contractor was Robie Construction Company , Inc. i. Normal Operating...INVENTORY OF DAMS P 0O - ... - SECTION 5 HYDROLOGY AND HYDRAULIC ANALYSIS • 5.1 Evaluation of Features a. General. Baker Dam Site 11 is an earthen

  14. National Dam Safety Program. Waterloo Dam (I.D. Number NY 709), Oswego River Basin, Seneca County, New York. Phase I Inspection Report,

    DTIC Science & Technology

    1980-09-30

    GEOTECHNICAL DATA 4 2.2 DESIGN RECORDS 4 2.3 CONSTRUCTION RECORDS 4 2.4 OPERATION RECORD 4 2.5 EVALUATION OF DATA 4 3 VISUAL INSPECTION 5 3.1 FINDINGS 5...g. Design and Construction History This dam was constructed in two stages as parts of Contracts E and G for Section I of the Cayuga and Seneca Canal...determine the final elevation of the footings at the time of construction to assure a proper foundation. 2.2 DESIGN RECORDS This dam was designed in

  15. Deduction of reservoir operating rules for application in global hydrological models

    NASA Astrophysics Data System (ADS)

    Coerver, Hubertus M.; Rutten, Martine M.; van de Giesen, Nick C.

    2018-01-01

    A big challenge in constructing global hydrological models is the inclusion of anthropogenic impacts on the water cycle, such as caused by dams. Dam operators make decisions based on experience and often uncertain information. In this study information generally available to dam operators, like inflow into the reservoir and storage levels, was used to derive fuzzy rules describing the way a reservoir is operated. Using an artificial neural network capable of mimicking fuzzy logic, called the ANFIS adaptive-network-based fuzzy inference system, fuzzy rules linking inflow and storage with reservoir release were determined for 11 reservoirs in central Asia, the US and Vietnam. By varying the input variables of the neural network, different configurations of fuzzy rules were created and tested. It was found that the release from relatively large reservoirs was significantly dependent on information concerning recent storage levels, while release from smaller reservoirs was more dependent on reservoir inflows. Subsequently, the derived rules were used to simulate reservoir release with an average Nash-Sutcliffe coefficient of 0.81.

  16. Effects of flow restoration on mussel growth in a Wild and Scenic North American River

    PubMed Central

    2013-01-01

    Background Freshwater mussels remain among the most imperiled species in North America due primarily to habitat loss or degradation. Understanding how mussels respond to habitat changes can improve conservation efforts. Mussels deposit rings in their shell in which age and growth information can be read, and thus used to evaluate how mussels respond to changes in habitat. However, discrepancies between methodological approaches to obtain life history information from growth rings has led to considerable uncertainty regarding the life history characteristics of many mussel species. In this study we compared two processing methods, internal and external ring examination, to obtain age and growth information of two populations of mussels in the St. Croix River, MN, and evaluated how mussel growth responded to changes in the operation of a hydroelectric dam. Results External ring counts consistently underestimated internal ring counts by 4 years. Despite this difference, internal and external growth patterns were consistent. In 2000, the hydroelectric dam switched from operating on a peaking schedule to run-of-the-river/partial peaking. Growth patterns between an upstream and downstream site of the dam were similar both before and after the change in operation. At the downstream site, however, older mussels had higher growth rates after the change in operation than the same sized mussels collected before the change. Conclusions Because growth patterns between internal and external processing methods were consistent, we suggest that external processing is an effective method to obtain growth information despite providing inaccurate age information. External processing is advantageous over internal processing due to its non-destructive nature. Applying this information to analyze the influence of the operation change in the hydroelectric dam, we suggest that changing to run-of-the-river/partial peaking operation has benefited the growth of older mussels below the dam. PMID:23452382

  17. Near-Field Based Communication and Electrical Systems

    NASA Astrophysics Data System (ADS)

    Azad, Umar

    A near-field power transfer equation for an inductively coupled near-field system is derived based on the equivalent circuit model of the coupled resonant loops. Experimental results show that the proposed near-field coupling equation is trustworthy as it correctly predicts the transferred power versus distance relationship for different values of loaded quality factors at the transmitter and the receiver. Capacity performance of near-field communication (NFC) links is analyzed for noise limited and interference limited scenarios based on information theory. The analytical results provide guidelines for design of inductively coupled antenna systems as the power and capacity budget of the link is carried out. Examples of inductively coupled VLF NFC links are evaluated for different operating scenarios, demonstrating the efficacy and importance of the proposed near-field link budget. However, in a conventional setup of inductively coupled NFC link, the power coupled through and the bandwidth must be traded off. Direct Antenna Modulation (DAM) is a feasible scheme to break this dilemma. With DAM utilized in NFC link, the power and bandwidth product limit in a high Q system can be circumvented because the non-linear/time-varying nature of the operation allows high speed modulations decoupled from the charging and discharging process of the high-Q resonator. In this work, the theory of NFC link with DAM on the transmitter is presented and validated with an experimental setup. Improvement in reception of the high-speed modulation information is observed in the experiment, implying that a superior capacity performance of a NFC link is achieved through DAM versus the traditional scheme. The resonant coupling efficiency is limited by the product of the quality factors Q, of the transmitter and receiver and the coupling coefficient k. We observe that in order to achieve maximum efficiency, the ratio of the load-to-loss impedances at both the source and load should be equal to a prescribed value. This is the same condition that yields simultaneous impedance matching at source and load. The efficiency limit is then calculated for single transmitter and two uncoupled receivers. In that case, optimal efficiency is obtained when the load-to-loss impedance ratio is equal to the same prescribed value for all devices simultaneously. However, this condition does not provide for simultaneous matching at the source and loads, which turns out to be impossible. The analysis is then generalized for a single transmitter and N uncoupled receivers and we find that as the number of receivers increases, the total efficiency limit also increases. Finally, we present the efficiency limits and optimal conditions for a system consisting of single and multiple repeaters between transmitter and receiver, which have been shown previously to relay power to larger distances.

  18. GC51D-0831: A Study of the Impact of Dams on Sediment Retention in the Mekong River Basin

    NASA Technical Reports Server (NTRS)

    Munroe, Thailynn; Griffin, Robert; Anderson, Eric; Markert, Kel

    2017-01-01

    Dam construction in the Mekong Basin has many cascading effects on the ecology, economy, and hydrology of the surrounding region. The focus of this study is to utilize the Soil Water Assessment Tool (SWAT), developed at Texas A & M, a rainfall-runoff hydrologic model to determine change in sedimentation in the Mekong Basin after the construction of dams. This study uses land cover land use and reservoir datasets created by the NASA SERVIR-Mekong Regional Land Cover Monitoring System and Dam Inundation Mapping Tool as inputs into the model. The study also builds on the capabilities of the SWAT model by using the sediment trapping efficiency (STE) equation from Brune (1953), rewritten by Kummu & Varis (2007), to calculate STE of dams and estimate change in sediment concentration downstream. The outputs from this study can be used to inform dam operation policies, study the correlation between dams and delta subsidence, and study the impact of dams on river fisheries, which are all pressing issues in the Mekong region.

  19. An application of extreme value theory to the management of a hydroelectric dam.

    PubMed

    Minkah, Richard

    2016-01-01

    Assessing the probability of very low or high water levels is an important issue in the management of hydroelectric dams. In the case of the Akosombo dam, very low and high water levels result in load shedding of electrical power and flooding in communities downstream respectively. In this paper, we use extreme value theory to estimate the probability and return period of very low water levels that can result in load shedding or a complete shutdown of the dam's operations. In addition, we assess the probability and return period of high water levels near the height of the dam and beyond. This provides a framework for a possible extension of the dam to sustain the generation of electrical power and reduce the frequency of spillage that causes flooding in communities downstream. The results show that an extension of the dam can reduce the probability and prolong the return period of a flood. In addition, we found a negligible probability of a complete shutdown of the dam due to inadequate water level.

  20. Sharing Perspectives and Learning from One Another: Southern Paiutes, Scientists, and Policymakers in the Glen Canyon Dam Adaptive Management Program

    NASA Astrophysics Data System (ADS)

    Austin, D. E.; Bulletts, K.; Bulletts, C.

    2017-12-01

    The traditional lands of the Southern Paiute people in the United States are bounded by more than 600 miles of the Colorado River from the Kaiparowits Plateau in the north to Blythe, California in the south. According to Southern Paiute traditional knowledge, Southern Paiutes were the first inhabitants of this region and are responsible for protecting and managing this land along with the water and all that is upon and within it. In 1963, the Bureau of Reclamation completed construction of Glen Canyon Dam on the Colorado River, and in 1972, the Glen Canyon National Recreation Area was established, encompassing Lake Mead above the Dam and a world class trout fishery on the Colorado River between the Dam and Lees Ferry. Below Lees Ferry on its way to Lake Mead and Hoover Dam, the Colorado River flows through Grand Canyon National Park and the Navajo and Hualapai reservations. U.S. federal law requires that Glen Canyon Dam be operated with minimal impact to the natural, recreational, and cultural resources of the region of the Colorado River that is potentially impacted by flows from the Dam. The Grand Canyon Protection Act and the Environmental Impact Statement (EIS) for the Operation of the Glen Canyon Dam established a program of long-term research and monitoring of the effects of the Dam on these resources. In 1991, three Southern Paiute tribes - the Kaibab Band of Paiute Indians, the Paiute Indian Tribe of Utah, and the San Juan Southern Paiute Tribe - agreed to participate in studies to identify cultural resources impacted by Glen Canyon Dam and to recommend strategies for their protection, In 1995, the EIS was completed and transition to the Adaptive Management Program (AMP) called for in the Grand Canyon Protection Act was begun. At that time, Southern Paiute activities expanded to include assessing potential environmental and cultural impacts of the dam, developing monitoring procedures, and interacting with scientists, other tribal representatives, and policymakers in the AMP. This presentation summarizes an analysis of two decades of Southern Paiute participation in the AMP, highlighting key interactions and learning experiences as well as ongoing challenges for Southern Paiute participants.

  1. Investigating passage of ESA-listed juvenile fall Chinook salmon at Lower Granite Dam during winter when the fish bypass system is not operated. 2006 Annual Report

    USGS Publications Warehouse

    Tiffan, Kenneth F.; Kock, Tobias J.; Connor, William P.

    2007-01-01

    During the winter of 2005-06, we radio and PIT tagged and released 48 juvenile fall Chinook salmon to evaluate over-wintering behavior and dam passage in the lower Snake River, Washington. Fish were released at the upstream end of the Lower Granite Dam forebay in November and December 2005. Fixed radio telemetry detection sites located in forebay and tailrace areas of Lower Granite, Little Goose, Lower Monumental and Ice Harbor dams were used to monitor fish movements and dam passage through early-May 2006. Of the 48 fish released during our study, 39 (81 %) passed Lower Granite Dam and were detected at downstream detection sites, 29 (60%) passed Little Goose Dam, 25 (52%) passed Lower Monumental Dam, and 15 (31%) passed Ice Harbor Dam. Thirty-seven (95%), 23 (79%), 16 (64%), and 9 (60%) of the fish that passed Lower Granite, Little Goose, Lower Monumental, and Ice Harbor dams respectively, did so when the fish bypass system was not operated. Passage of tagged fish past lower Snake River dams generally declined during the winter, but increased again after bypass began in April. Fish residence times in reservoirs and forebays was lengthy during the winter (up to 118 d), and varied by reservoir and time of year. We observed no diel passage trends. Only 15 of the 48 fish were subsequently detected at a PIT-tag interrogation site the following spring. We believe that passage of overwintering juvenile fall Chinook salmon during winter is due more to chance than directed downstream movement. Since the primary route of passage during the winter is through powerhouse turbines, the potential exists for increased mortality for over-wintering juvenile fall Chinook salmon in the Snake River. Our findings also have implications for transportation studies of subyearling fall Chinook salmon in the Snake River. Specifically, the finding that some fish can pass undetected during the winter may bias smolt-to-adult return rate calculations that are typically used to measure the success of the aforementioned management actions.

  2. Using causal maps to support ex-post assessment of social impacts of dams

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Aledo, Antonio, E-mail: Antonio.Aledo@ua.es; García-Andreu, Hugo, E-mail: Hugo.Andreu@ua.es; Pinese, José, E-mail: pinese@uel.br

    - Highlights: • We defend the usefulness of causal maps (CM) for ex-post impact assessment of dams. • Political decisions are presented as unavoidable technical measures. • CM enable the identification of multiple causes involved in the dam impacts. • An alternative management of the dams is shown from the precise tracking of the causes. • Participatory CM better the quality of information and the governance of the research. This paper presents the results of an ex-post assessment of two important dams in Brazil. The study follows the principles of Social Impact Management, which offer a suitable framework for analyzingmore » the complex social transformations triggered by hydroelectric dams. In the implementation of this approach, participative causal maps were used to identify the ex-post social impacts of the Porto Primavera and Rosana dams on the community of Porto Rico, located along the High Paraná River. We found that in the operation of dams there are intermediate causes of a political nature, stemming from decisions based on values and interests not determined by neutral, exclusively technical reasons; and this insight opens up an area of action for managing the negative impacts of dams.« less

  3. 23 CFR 630.802 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Applicability. 630.802 Section 630.802 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS PRECONSTRUCTION PROCEDURES Bridges on Federal Dams § 630.802 Applicability. A proposed bridge over a dam, together with the...

  4. 23 CFR 630.802 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Applicability. 630.802 Section 630.802 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS PRECONSTRUCTION PROCEDURES Bridges on Federal Dams § 630.802 Applicability. A proposed bridge over a dam, together with the...

  5. Study on Reventment-Protected and Non-Bottom-Protected Plunge Pool of High Arch Dam

    NASA Astrophysics Data System (ADS)

    Yingkui, Wang; Quxiu, Cao; Fanhui, Kong

    2018-05-01

    Lots of high arch dam have the characteristics of “High head, Large discharge and Narrow river valley”, therefore, the security researches of energy dissipation were always the focus in these hydro-projects. Statistically, the trajectory type energy dissipation is the most widely used in the built high arch dams, and the water plunge poor were always set downstream the dam body. However, the widely used protected plunge poor need large investment with the disadvantage of complicated operation and maintenance. Along with the construction of concrete high arch dam in the Southwest China, the river overburden and water cushion were deep in dam site, which is becoming a new characteristic of these hydro-projects. Accordingly, the deep water cushion can be used for the energy dissipation design, such as the “Reventment-Protected and Non-Bottom-Protected Plunge Pool”, which has the advantage of more simplified project design and more economy investment.

  6. The Economic Benefits Of Multipurpose Reservoirs In The United States- Federal Hydropower Fleet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hadjerioua, Boualem; Witt, Adam M.; Stewart, Kevin M.

    The United States is home to over 80,000 dams, of which approximately 3% are equipped with hydroelectric generating capabilities. When a dam serves as a hydropower facility, it provides a variety of energy services that range from clean, reliable power generation to load balancing that supports grid stability. In most cases, the benefits of dams and their associated reservoirs go far beyond supporting the nation s energy demand. As evidenced by the substantial presence of non-powered dams with the ability to store water in large capacities, the primary purpose of a dam may not be hydropower, but rather one ofmore » many other purposes. A dam and reservoir may support navigation, recreation, flood control, irrigation, and water supply, with each multipurpose benefit providing significant social and economic impacts on a local, regional, and national level. When hydropower is one of the services provided by a multipurpose reservoir, it is then part of an integrated system of competing uses. Operating rules, management practices, consumer demands, and environmental constraints must all be balanced to meet the multipurpose project s objectives. When federal dams are built, they are authorized by Congress to serve one or more functions. Legislation such as the Water Resources Development Act regulates the operation of the facility in order to coordinate the authorized uses and ensure the dam s intended objectives are being met. While multipurpose reservoirs account for billions of dollars in contributions to National Economic Development (NED) every year, no attempt has been made to evaluate their benefits on a national scale. This study is an on-going work conducted by Oak Ridge National Laboratory in an effort to estimate the economic benefits of multipurpose hydropower reservoirs in the United States. Given the important role that federal hydropower plays in the U.S., the first focus of this research will target the three main federal hydropower owners Tennessee Valley Authority, U.S. Army Corps of Engineers, and U.S. Bureau of Reclamation. Together these three agencies own and operate 157 powered dams which account for almost half of the total installed hydropower capacity in the U.S. Future work will include engaging publicly-owned utilities and the private sector in order to quantify the benefits of all multipurpose hydropower reservoirs in the U.S.« less

  7. The Effects of the Saluda Dam on the Surface-Water and Ground-Water Hydrology of the Congaree National Park Flood Plain, South Carolina

    USGS Publications Warehouse

    Conrads, Paul; Feaster, Toby D.; Harrelson, Larry G.

    2008-01-01

    The Congaree National Park was established '... to preserve and protect for the education, inspiration, and enjoyment of present and future generations an outstanding example of a near-virgin, southern hardwood forest situated in the Congaree River flood plain in Richland County, South Carolina' (Public Law 94-545). The resource managers at Congaree National Park are concerned about the timing, frequency, magnitude, and duration of flood-plain inundation of the Congaree River. The dynamics of the Congaree River directly affect ground-water levels in the flood plain, and the delivery of sediments and nutrients is constrained by the duration, extent, and frequency of flooding from the Congaree River. The Congaree River is the southern boundary of the Congaree National Park and is formed by the convergence of the Saluda and Broad Rivers 24 river miles upstream from the park. The streamflow of the Saluda River has been regulated since 1929 by the operation of the Saluda Dam at Lake Murray. The U.S. Geological Survey, in cooperation with the National Park Service, Congaree National Park, studied the interaction between surface water in the Congaree River and ground water in the flood plain to determine the effect Saluda Dam operations have on water levels in the Congaree National Park flood plain. Analysis of peak flows showed the reduction in peak flows after the construction of Lake Murray was more a result of climate variability and the absence of large floods after 1930 than the operation of the Lake Murray dam. Dam operations reduced the recurrence interval of the 2-year to 100-year peak flows by 6.1 to 17.6 percent, respectively. Analysis of the daily gage height of the Congaree River showed that the dam has had the effect of lowering high gage heights (95th percentile) in the first half of the year (December to May) and raising low gage heights (5th percentile) in the second half of the year (June to November). The dam has also had the effect of increasing the 1-, 3-, 7-, 30-, and 90-day minimum gage heights by as much as 23.9 percent and decreasing the 1-, 3-, 7-, 30-, and 90-day maximum gage heights by as much as 7.2 percent. Analysis of the ground-water elevations in the Congaree National Park flood plain shows similar results as the gage-height analysis--the dam has had the effect of lowering high ground-water elevations and increasing low ground-water elevations. Overall, the operation of the dam has had a greater effect on the gage heights within the river banks than gage heights in the flood plain. This result may have a greater effect on the subsurface water levels of the surficial flood-plain aquifer than the frequency and magnitude of inundation of the flood plain.

  8. Balancing ecosystem services with energy and food security - assessing trade-offs for reservoir operation and irrigation investment in Kenya's Tana basin

    NASA Astrophysics Data System (ADS)

    Hurford, A. P.; Harou, J. J.

    2014-01-01

    Competition for water between key economic sectors and the environment means agreeing on allocation is challenging. Managing releases from the three major dams in Kenya's Tana River basin with its 4.4 million inhabitants, 567 MW of installed hydropower capacity, 33 000 ha of irrigation and ecologically important wetlands and forests is a pertinent example. This research seeks to identify and help decision-makers visualise reservoir management strategies which result in the best possible (Pareto-optimal) allocation of benefits between sectors. Secondly we seek to show how trade-offs between achievable benefits shift with the implementation of new proposed rice, cotton and biofuel irrigation projects. To identify the Pareto-optimal trade-offs we link a water resources management model to a multi-criteria search algorithm. The decisions or "levers" of the management problem are volume dependent release rules for the three major dams and extent of investment in new irrigation schemes. These decisions are optimised for objectives covering provision of water supply and irrigation, energy generation and maintenance of ecosystem services which underpin tourism and local livelihoods. Visual analytic plots allow decision makers to assess multi-reservoir rule-sets by understanding their impacts on different beneficiaries. Results quantify how economic gains from proposed irrigation schemes trade-off against disturbance of the flow regime which supports ecosystem services. Full implementation of the proposed schemes is shown to be Pareto-optimal, but at high environmental and social cost. The clarity and comprehensiveness of "best-case" trade-off analysis is a useful vantage point from which to tackle the interdependence and complexity of water-energy-food "nexus" challenges.

  9. Research on early-warning index of the spatial temperature field in concrete dams.

    PubMed

    Yang, Guang; Gu, Chongshi; Bao, Tengfei; Cui, Zhenming; Kan, Kan

    2016-01-01

    Warning indicators of the dam body's temperature are required for the real-time monitoring of the service conditions of concrete dams to ensure safety and normal operations. Warnings theories are traditionally targeted at a single point which have limitations, and the scientific warning theories on global behavior of the temperature field are non-existent. In this paper, first, in 3D space, the behavior of temperature field has regional dissimilarity. Through the Ward spatial clustering method, the temperature field was divided into regions. Second, the degree of order and degree of disorder of the temperature monitoring points were defined by the probability method. Third, the weight values of monitoring points of each regions were explored via projection pursuit. Forth, a temperature entropy expression that can describe degree of order of the spatial temperature field in concrete dams was established. Fifth, the early-warning index of temperature entropy was set up according to the calculated sequential value of temperature entropy. Finally, project cases verified the feasibility of the proposed theories. The early-warning index of temperature entropy is conducive to the improvement of early-warning ability and safety management levels during the operation of high concrete dams.

  10. Deformable Bullnose Energy Absorbing System (BEAS). Report 2: Head-On Impact with a Deformable BEAS and Introducing a Collapsible Arch

    DTIC Science & Technology

    2011-07-01

    gate operations at Belleville Locks and Dam. ........................... 105 Figure 5.20 The non-linear costs for full closure of the locks and dam...Super Cone Fender Front Arch Results ................................................. 96 Table 5.3 Costs Over Time for Full Closure at Particular Corps...Corps Navigation Economics PDT tabulation of costs over time for full closure at the Corps lock and dam structures. Bob Willis also supplied the

  11. Mitigation for the Construction and Operation of Libby Dam, 2004-2005 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunnigan, James; DeShazer, Jay; Garrow, Larry

    2005-06-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine themore » biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana Fish, Wildlife & Parks (MFWP) uses a combination of techniques to collect physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered and threatened species, and the assessment of restoration or management activities designed to restore native fishes and their habitats.« less

  12. Mitigation for the Construction and Operation of Libby Dam, 2003-2004 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunnigan, James; DeShazer, Jay; Garrow, Larry

    2004-06-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determinemore » the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana FWP uses a combination of diverse techniques to collect a variety of physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered, threatened species, and the assessment of restoration or management activities intended to restore native fishes and their habitats.« less

  13. Passage Distribution and Federal Columbia River Power System Survival for Steelhead Kelts Tagged Above and at Lower Granite Dam, Year 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Colotelo, Alison HA; Harnish, Ryan A.; Jones, Bryan W.

    Steelhead (Oncorhynchus mykiss) populations have declined throughout their range in the last century and many populations, including those of the Snake River Basin are listed under the Endangered Species Act of 1973. The reasons for their decline are many and complex, but include habitat loss and degradation, overharvesting, and dam construction. The 2008 Biological Opinion calls for an increase in the abundance of female steelhead through an increase in iteroparity (i.e., repeat spawning) and this can be realized through a combination of reconditioning and in-river survival of migrating kelts. The goal of this study is to provide the data necessarymore » to inform fisheries managers and dam operators of Snake River kelt migration patterns, survival, and routes of dam passage. Steelhead kelts (n = 487) were captured and implanted with acoustic transmitters and passive integrated transponder (PIT)-tags at the Lower Granite Dam (LGR) Juvenile Fish Facility and at weirs located in tributaries of the Snake and Clearwater rivers upstream of LGR. Kelts were monitored as they moved downstream through the Federal Columbia River Power System (FCRPS) by 15 autonomous and 3 cabled acoustic receiver arrays. Cabled receiver arrays deployed on the dam faces allowed for three-dimensional tracking of fish as they approached the dam face and were used to determine the route of dam passage. Overall, 27.3% of the kelts tagged in this study successfully migrated to Martin Bluff (rkm 126, as measured from the mouth of the Columbia River), which is located downstream of all FCRPS dams. Within individual river reaches, survival per kilometer estimates ranged from 0.958 to 0.999; the lowest estimates were observed in the immediate forebay of FCRPS dams. Steelhead kelts tagged in this study passed over the spillway routes (spillway weirs, traditional spill bays) in greater proportions and survived at higher rates compared to the few fish passed through powerhouse routes (turbines and juvenile bypass systems). The results of this study provide information about the route of passage and subsequent survival of steelhead kelts that migrated through the Snake and Columbia rivers from LGR to Bonneville Dam in 2013. These data may be used by fisheries managers and dam operators to identify potential ways to increase the survival of kelts during their seaward migrations.« less

  14. Passage Distribution and Federal Columbia River Power System Survival for Steelhead Kelts Tagged Above and at Lower Granite Dam, Year 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Colotelo, Alison H.A.; Harnish, Ryan A.; Jones, Bryan W.

    2014-12-15

    Steelhead (Oncorhynchus mykiss) populations have declined throughout their range in the last century and many populations, including those of the Snake River Basin are listed under the Endangered Species Act of 1973. The reasons for their decline are many and complex, but include habitat loss and degradation, overharvesting, and dam construction. The 2008 Biological Opinion calls for an increase in the abundance of female steelhead through an increase in iteroparity (i.e., repeat spawning) and this can be realized through a combination of reconditioning and in-river survival of migrating kelts. The goal of this study is to provide the data necessarymore » to inform fisheries managers and dam operators of Snake River kelt migration patterns, survival, and routes of dam passage. Steelhead kelts (n = 487) were captured and implanted with acoustic transmitters and passive integrated transponder (PIT)-tags at the Lower Granite Dam (LGR) Juvenile Fish Facility and at weirs located in tributaries of the Snake and Clearwater rivers upstream of LGR. Kelts were monitored as they moved downstream through the Federal Columbia River Power System (FCRPS) by 15 autonomous and 3 cabled acoustic receiver arrays. Cabled receiver arrays deployed on the dam faces allowed for three-dimensional tracking of fish as they approached the dam face and were used to determine the route of dam passage. Overall, 27.3% of the kelts tagged in this study successfully migrated to Martin Bluff (rkm 126, as measured from the mouth of the Columbia River), which is located downstream of all FCRPS dams. Within individual river reaches, survival per kilometer estimates ranged from 0.958 to 0.999; the lowest estimates were observed in the immediate forebay of FCRPS dams. Steelhead kelts tagged in this study passed over the spillway routes (spillway weirs, traditional spill bays) in greater proportions and survived at higher rates compared to the few fish passed through powerhouse routes (turbines and juvenile bypass systems). The results of this study provide information about the route of passage and subsequent survival of steelhead kelts that migrated through the Snake and Columbia rivers from LGR to Bonneville Dam in 2013. These data may be used by fisheries managers and dam operators to identify potential ways to increase the survival of kelts during their seaward migrations.« less

  15. Integrated Flood Forecast and Virtual Dam Operation System for Water Resources and Flood Risk Management

    NASA Astrophysics Data System (ADS)

    Shibuo, Yoshihiro; Ikoma, Eiji; Lawford, Peter; Oyanagi, Misa; Kanauchi, Shizu; Koudelova, Petra; Kitsuregawa, Masaru; Koike, Toshio

    2014-05-01

    While availability of hydrological- and hydrometeorological data shows growing tendency and advanced modeling techniques are emerging, such newly available data and advanced models may not always be applied in the field of decision-making. In this study we present an integrated system of ensemble streamflow forecast (ESP) and virtual dam simulator, which is designed to support river and dam manager's decision making. The system consists of three main functions: real time hydrological model, ESP model, and dam simulator model. In the real time model, the system simulates current condition of river basins, such as soil moisture and river discharges, using LSM coupled distributed hydrological model. The ESP model takes initial condition from the real time model's output and generates ESP, based on numerical weather prediction. The dam simulator model provides virtual dam operation and users can experience impact of dam control on remaining reservoir volume and downstream flood under the anticipated flood forecast. Thus the river and dam managers shall be able to evaluate benefit of priori dam release and flood risk reduction at the same time, on real time basis. Furthermore the system has been developed under the concept of data and models integration, and it is coupled with Data Integration and Analysis System (DIAS) - a Japanese national project for integrating and analyzing massive amount of observational and model data. Therefore it has advantage in direct use of miscellaneous data from point/radar-derived observation, numerical weather prediction output, to satellite imagery stored in data archive. Output of the system is accessible over the web interface, making information available with relative ease, e.g. from ordinary PC to mobile devices. We have been applying the system to the Upper Tone region, located northwest from Tokyo metropolitan area, and we show application example of the system in recent flood events caused by typhoons.

  16. Hydroacoustic Evaluation of Juvenile Salmonid Passage at The Dalles Dam Sluiceway, 2005

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.; Khan, Fenton; Hedgepeth, J

    2006-06-01

    The U.S. Army Corps of Engineers Portland District engaged the Pacific Northwest National Laboratory to evaluate fish passage at The Dalles Dam powerhouse in 2005. The goal of the study was to provide information on smolt passage that will inform decisions on long-term measures and operations to enhance sluiceway passage and reduce turbine passage to improve smolt survival at the dam. The study addressed one of the main programs dedicated to improving juvenile salmonid survival at The Dalles Dam: Surface Flow Bypass. The study objectives (see below) were met using a combination of hydroacoustic and hydraulic data. The study incorporatedmore » fixed-location hydroacoustic methods across the entire powerhouse, with especially intense sampling using multiple split-beam transducers at all sluiceway portals. We did not sample fish passage at the spillway in 2005. In the sluiceway nearfield, we used an acoustic camera to track fish movements. The fish data were interpreted with hydraulic data from a computational fluid dynamics (CFD) model. Fish passage data were collected in the framework of an “experiment” using a randomized block design (3-day treatments; two treatments) to compare two sluiceway operational configurations: Sluice 2+5 and Sluice 2+19 (six gates open for each configuration). Total project outflow was 76% of the 10-year average for spring and 71% of the 10-year average for summer. Based on these findings, we make the following recommendations: 1) The sluice should be operated 24 h/d from April until November. 2) Open six rather than three sluice gates to take advantage of the maximum hydraulic capacity of the sluiceway. 3) Open the three gates above the western-most operating main turbine unit and the three gates at MU 8 where turbine passage rates are relatively high. 4) Operate the turbine units below open sluice gates as a standard fish operations procedure. 5) Develop hydraulic and entrance enhancements to the sluiceway to tap the potential of The Dalles Dam sluiceway to be highly efficient and effective at passing juvenile salmonids. 6) Consider the following elements for surface flow bypasses during design of any sluiceway enhancements at The Dalles Dam: Form an extensive surface flow bypass flow net (surface bypass discharge greater than ~7% of total project discharge) at both west and east ends of the dam; Create a gradual increase in water velocity approaching the surface flow bypass (ideally, acceleration < 1 m/s per meter); Make water velocities at an entrance high enough (> 3 m/s) to entrain the subject juvenile fishes, e.g., 10,000 cfs or so; Adapt the shape and orientation of the surface entrance(s) to fit site-specific features, i.e., test a Removable Sluiceway Weir. 7)The Dalles Dam sluiceway has potential to be highly efficient and effective at passing juvenile salmonids. We recommend tapping this potential with enhancements to the sluiceway.« less

  17. Project Planning for Cougar Dam during 2010

    USGS Publications Warehouse

    Haskell, Craig A.; Tiffan, Kenneth F.

    2011-01-01

    Cougar Dam is a 158 m-tall, rock fill dam located about 63 km east of Springfield, Oregon. Completed in 1963, the dam is owned and operated by the U.S. Army Corps of Engineers (USACE). It impounds Cougar Reservoir, which is 9.7 km long, has a surface area of 518 ha, and is predominately used for flood control. The pool elevation typically ranges from a maximum conservation pool of 515 m (1,690 ft) National Geodetic Vertical Datum (NGVD) in summer to a minimum flood control elevation of 467 m (1,532 ft NGVD) in winter. The reservoir thermally stratifies in the summer, has an average depth of 37 m, and holds 153,500 acre-feet when full. Cougar Dam is located on the South Fork of the McKenzie River 7 km upstream from the mainstem McKenzie River, a tributary of the Willamette River. The McKenzie River Basin basin supports the largest remaining population of wild spawning spring Chinook salmon in the Willamette River Basin (National Oceanic and Atmospheric Administration; NOAA, 2008). Cougar Dam and others were collectively deemed to cause jeopardy to the sustainability of anadromous fish stocks in the Willamette River Basin (NOAA, 2008). Prior to dam construction, as many as 805 redds were observed in the South Fork of the McKenzie River (Willis and others, 1960) and it is estimated that 40 km of spawning habitat were lost when access was blocked after dam construction. The 2008 Willamette Biological Opinion (BIOP) requires improvements to operations and structures to reduce impacts on Upper Willamette River (UWR) Chinook salmon (Oncorhynchus tshawytscha) and UWR steelhead (O. mykiss; NOAA, 2008). In 2010, an adult fish collection facility was completed below Cougar Dam to collect returning adult salmon for transport to spawning habitats above the dam. Before that time, returning adult spring Chinook salmon were transported to upstream spawning areas as part of a trap-and-haul program with adults passed ranging annually from 0 to 1,038 (Taylor, 2000). The progeny of adult fish that are allowed to spawn above Cougar Dam move downstream into Cougar Reservoir in the spring. Under the BIOP, the USACE is required to provide downstream fish passage or operational alternatives at Cougar Dam by 2014. Currently, there is little information about the seasonal timing of reservoir entry of juvenile Chinook salmon and what habitats they and other fishes use in the reservoir. However, rotary screw traps placed in the outlet channel below the dam indicate peak juvenile passage coinciding with seasonally low pool elevation in mid December and late January. It is unknown whether juveniles upstream of Cougar Dam can be captured in large enough numbers for tagging and subsequent survival studies to proceed. These studies are needed to examine the feasibility of installing downstream fish passage structures at Cougar Dam to meet BIOP requirements. Therefore, the USACE contracted with the U.S. Geological Survey (USGS) to test the efficacy of using a mid-water trawl and lampara seine to capture fish in Cougar Reservoir on three consecutive days in the fall of 2010. These collection methods could potentially provide fish for feasibility and subsequent survival studies and as verification of fish targets in future active hydroacoustic surveys.

  18. Rubber dam use less stressful for children and dentists.

    PubMed

    Innes, Nicola

    2012-06-01

    Randomised controlled trial, single centre and operator. 72 patients (6-16 years) assessed as compliant, with no allergies, not on significant medication were divided into two groups by 'drawing sealed lots'. 234 fully erupted teeth were sealed. Molars and/or premolars were sealed dependant on age. Teeth were pre-cleaned with prophy paste. In the controls, teeth were isolated with buccal and lingual cotton rolls and salivary ejector in the intervention group a rubber dam was used. The same etching, rinsing and placement protocol was used in both arms. Outcomes were: patients' subjective measures of pain using a visual analogue scale; blood pressure (before and after treatment), breath rate, pulse rate and skin resistance at five time points. The operator's pulse rate was measured and they completed a questionnaire on subjective mental and physical stress following treatment. Treatment times were recorded. The breath rate was significantly (P < 0.05) lower and the skin resistance level was significantly higher during treatment with rubber dam compared to the control group. Subjective pain perception was significantly lower for the test group. The treatment time needed for the fissure sealing procedure was 12.4% less in the test group. The authors state; '... in the hands of an experienced dentist, isolation with rubber dam is less stressful for children and adolescents than isolation with cotton rolls, and can save valuable treatment time.' The operator's stress measures were lower with rubber dam and treatment time was reduced.

  19. Assessment of suspended-sediment transport, bedload, and dissolved oxygen during a short-term drawdown of Fall Creek Lake, Oregon, winter 2012-13

    USGS Publications Warehouse

    Schenk, Liam N.; Bragg, Heather M.

    2014-01-01

    The drawdown of Fall Creek Lake resulted in the net transport of approximately 50,300 tons of sediment from the lake during a 6-day drawdown operation, based on computed daily values of suspended-sediment load downstream of Fall Creek Dam and the two main tributaries to Fall Creek Lake. A suspended-sediment budget calculated for 72 days of the study period indicates that as a result of drawdown operations, there was approximately 16,300 tons of sediment deposition within the reaches of Fall Creek and the Middle Fork Willamette River between Fall Creek Dam and the streamgage on the Middle Fork Willamette River at Jasper, Oregon. Bedload samples collected at the station downstream of Fall Creek Dam during the drawdown were primarily composed of medium to fine sands and accounted for an average of 11 percent of the total instantaneous sediment load (also termed sediment discharge) during sample collection. Monitoring of dissolved oxygen at the station downstream of Fall Creek Dam showed an initial decrease in dissolved oxygen concurrent with the sediment release over the span of 5 hours, though the extent of dissolved oxygen depletion is unknown because of extreme and rapid fouling of the probe by the large amount of sediment in transport. Dissolved oxygen returned to background levels downstream of Fall Creek Dam on December 18, 2012, approximately 1 day after the end of the drawdown operation.

  20. Quantifying the extent of river fragmentation by hydropower dams in the Sarapiquí River Basin, Costa Rica

    USGS Publications Warehouse

    Anderson, Elizabeth P.; Pringle, Catherine M.; Freeman, Mary C.

    2008-01-01

    Costa Rica has recently experienced a rapid proliferation of dams for hydropower on rivers draining its northern Caribbean slope. In the Sarapiquí River Basin, eight hydropower plants were built between 1990 and 1999 and more projects are either under construction or proposed. The majority of these dams are small (<15 m tall) and operate as water diversion projects.While the potential environmental effects of individual projects are evaluated prior to dam construction, there is a need for consideration of the basin-scale ecological consequences of hydropower development. This study was a first attempt to quantify the extent of river fragmentation by dams in the Sarapiquí River Basin.Using simple spatial analyses, the length of river upstream from dams and the length of de-watered reaches downstream from dams was measured. Results indicated that there are currently 306.8 km of river (9.4% of the network) upstream from eight existing dams in the Sarapiquí River Basin and 30.6 km of rivers (0.9% of the network) with significantly reduced flow downstream from dams. Rivers upstream from dams primarily drain two life zones: Premontane Rain Forest (107.9 km) and Lower Montane Rain Forest (168.2 km).Simple spatial analyses can be used as a predictive or planning tool for considering the effects of future dams in a basin-scale context. In the Sarapiquí River Basin, we recommend that future dam projects be constructed on already dammed rivers to minimize additional river fragmentation and to protect remaining riverine connectivity.

  1. 43 CFR 418.15 - Operations monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Wadsworth—U.S. Geological Survey (USGS) gauge number 10351300; (ii) Carson River below Lahontan Dam—USGS gauge number 10312150; (iii) Rock Dam Ditch near the end of the concrete lining; and (2) Subtracting: (i... Tarzyn Road near Fallon (below Sagouspe Dam) for satisfying water rights outside of the Project...

  2. 43 CFR 418.15 - Operations monitoring.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Wadsworth—U.S. Geological Survey (USGS) gauge number 10351300; (ii) Carson River below Lahontan Dam—USGS gauge number 10312150; (iii) Rock Dam Ditch near the end of the concrete lining; and (2) Subtracting: (i... Tarzyn Road near Fallon (below Sagouspe Dam) for satisfying water rights outside of the Project...

  3. 33 CFR 263.23 - Small flood control project authority (Section 205).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operation, except as may result from the normal procedure applying to projects authorized after submission of preliminary examination and survey reports. (b) Non-Federal responsibilities for dam and reservoir project. All new projects under this authority, including dams and reservoirs, are considered local...

  4. 33 CFR 263.23 - Small flood control project authority (Section 205).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... operation, except as may result from the normal procedure applying to projects authorized after submission of preliminary examination and survey reports. (b) Non-Federal responsibilities for dam and reservoir project. All new projects under this authority, including dams and reservoirs, are considered local...

  5. Application of a hierarchical framework for assessing environmental impacts of dam operation: changes in hydrology, channel hydraulics, bed mobility and recruitment of riparian trees in a western North American river

    Treesearch

    Michael Burke; Klaus Jorde; John M. Buffington

    2009-01-01

    River systems have been altered worldwide by dams and diversions, resulting in a broad array of environmental impacts. The use of a process-based, hierarchical framework for assessing environmental impacts of dams is explored here in terms of a case study of the Kootenai River, western North America. The goal of the case study is to isolate and quantify the relative...

  6. 33 CFR 208.11 - Regulations for use of storage allocated for flood control or navigation and/or project operation...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... VA Pwr. Glen Elder Dam & Waconda Lk KS Mitchel Solomon R FIM 722.3204.8 1488.31455.6 1455.61428.0... 820 PL 78-534 USBR. Kirwin Dam & Res KS Phillips N Fork Solomon R F ICR 215.1 89.6 1757.3 1729.2 1729... Webster Dam & Res KS Rocks S Fork Solomon R F IRC 183.4 72.1 1923.7 1892.5 1892.5 1860.0 8480 3772 3772...

  7. 33 CFR 208.11 - Regulations for use of storage allocated for flood control or navigation and/or project operation...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... VA Pwr. Glen Elder Dam & Waconda Lk KS Mitchel Solomon R FIM 722.3204.8 1488.31455.6 1455.61428.0... 820 PL 78-534 USBR. Kirwin Dam & Res KS Phillips N Fork Solomon R F ICR 215.1 89.6 1757.3 1729.2 1729... Webster Dam & Res KS Rocks S Fork Solomon R F IRC 183.4 72.1 1923.7 1892.5 1892.5 1860.0 8480 3772 3772...

  8. Evaluation of the Hydropower Generation Potential of a Dam Using Optimization Techniques: Application to Doma Dam, Nassarawa, in North Central Nigeria

    NASA Astrophysics Data System (ADS)

    Salami, Adebayo Wahab; Sule, Bolaji Fatai; Adunkpe, Tope Lacroix; Ayanshola, Ayanniyi Mufutau; Bilewu, Solomon Olakunle

    2017-03-01

    Optimization models have been developed to maximize annual energy generation from the Doma dam, subject to the constraint of releases for irrigation, ecological purposes, the water supply, the maximum yield from the reservoir and reservoir storage. The model was solved with LINGO software for various mean annual inflow exceedence probabilities. Two scenarios of hydropower retrofitting were considered. Scenario 1, with the reservoir inflows at 50%, 75%, and 90% probabilities of exceedence, gives the total annual hydropower as 0.531 MW, 0.450 MW and 0.291 MW, respectively. The corresponding values for scenario 2 were 0.615 MW, 0.507 MW, and 0.346 MW respectively. The study also considered increasing the reservoir's live storage to 32.63Mm3 by taking part of the flood storage so that the maximum draft increases to 7 Mm3. With this upper limit of storage and draft with reservoir inflows of 50%, 75% and 90% probabilities of exceedence, the hydropower generated increased to 0.609 MW, 0.540 MW, and 0.347 MW respectively for the scenario 1 arrangement, while those of scenario 2 increased to 0.699 MW, 0.579MW and 0.406 MW respectively. The results indicate that the Doma Dam is suitable for the production of hydroelectric power and that its generation potential is between 0.61 MW and 0.70 MW.

  9. Emergency Fish Restoration Project; Final Report 2002.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LeCaire, Richard

    Lake Roosevelt is a 151-mile impoundment created by the construction of Grand Coulee Dam during the early 1940's. The construction of the dam permanently and forever blocked the once abundant anadromous fish runs to the upper Columbia Basin. Since the construction of Grand Coulee Dam in 1943 and Chief Joseph Dam in 1956 this area is known as the blocked area. The blocked area is totally dependant upon resident fish species to provide a subsistence, recreational and sport fishery. The sport fishery of lake Roosevelt is varied but consists mostly of Rainbow trout (Oncorhynchus mykiss), Kokanee salmon (Oncorhynchus nerka), Walleyemore » (Stizostedion vitreum) Small mouth bass (Micropterus dolomieui) and white sturgeon (Acipenser transmontanus). Currently, Bonneville Power Administration funds and administers two trout/kokanee hatcheries on Lake Roosevelt. The Spokane Tribe of Indians operates one hatchery, the Washington Department of Fish and Wildlife the other. In addition to planting fish directly into Lake Roosevelt, these two hatcheries also supply fish to a net pen operation that also plants the lake. The net pen project is administered by Bonneville Power funded personnel but is dependant upon volunteer labor for daily feeding and monitoring operations. This project has demonstrated great success and is endorsed by the Colville Confederated Tribes, the Spokane Tribe of Indians, the Washington Department of Fish and Wildlife, local sportsmen associations, and the Lake Roosevelt Forum. The Lake Roosevelt/Grand Coulee Dam area is widely known and its diverse fishery is targeted by large numbers of anglers annually to catch rainbow trout, kokanee salmon, small mouth bass and walleye. These anglers contribute a great deal to the local economy by fuel, grocery, license, tackle and motel purchases. Because such a large portion of the local economy is dependant upon the Lake Roosevelt fishery and tourism, any unusual operation of the Lake Roosevelt system may have a substantial impact to the economy. During the past several years the Chief Joseph Kokanee Enhancement project has been collecting data pertaining to fish entraining out of the lake through Grand Coulee Dam. During 1996 and 1997 the lake was deeply drawn down to accommodate the limited available water during a drought year and for the highly unusual draw-down of Lake Roosevelt during the critical Northwest power shortage. The goal of the project is to enhance the resident rainbow trout fishery in Lake Roosevelt lost as a result of the unusual operation of Grand Coulee dam during the drought/power shortage.« less

  10. Method of Evaluating the Life Cycle Cost of Small Earth Dams Considering the Risk of Heavy Rainfall and Selection Method of the Optimum Countermeasure

    NASA Astrophysics Data System (ADS)

    Hori, Toshikazu; Mohri, Yoshiyuki; Matsushima, Kenichi; Ariyoshi, Mitsuru

    In recent years the increase in the number of heavy rainfall occurrences such as through unpredictable cloudbursts have resulted in the safety of the embankments of small earth dams needing to be improved. However, the severe financial condition of the government and local autonomous bodies necessitate the cost of improving them to be reduced. This study concerns the development of a method of evaluating the life cycle cost of small earth dams considered to pose a risk and in order to improve the safety of the downstream areas of small earth dams at minimal cost. Use of a safety evaluation method that is based on a combination of runoff analysis, saturated and unsaturated seepage analysis, and slope stability analysis enables the probability of a dam breach and its life cycle cost with the risk of heavy rainfall taken into account to be calculated. Moreover, use of the life cycle cost evaluation method will lead to the development of a technique for selecting the method of the optimal improvement or countermeasures against heavy rainfall.

  11. The potential for dams to impact lowland meandering river floodplain geomorphology.

    PubMed

    Marren, Philip M; Grove, James R; Webb, J Angus; Stewardson, Michael J

    2014-01-01

    The majority of the world's floodplains are dammed. Although some implications of dams for riverine ecology and for river channel morphology are well understood, there is less research on the impacts of dams on floodplain geomorphology. We review studies from dammed and undammed rivers and include influences on vertical and lateral accretion, meander migration and cutoff formation, avulsion, and interactions with floodplain vegetation. The results are synthesized into a conceptual model of the effects of dams on the major geomorphic influences on floodplain development. This model is used to assess the likely consequences of eight dam and flow regulation scenarios for floodplain geomorphology. Sediment starvation downstream of dams has perhaps the greatest potential to impact on floodplain development. Such effects will persist further downstream where tributary sediment inputs are relatively low and there is minimal buffering by alluvial sediment stores. We can identify several ways in which floodplains might potentially be affected by dams, with varying degrees of confidence, including a distinction between passive impacts (floodplain disconnection) and active impacts (changes in geomorphological processes and functioning). These active processes are likely to have more serious implications for floodplain function and emphasize both the need for future research and the need for an "environmental sediment regime" to operate alongside environmental flows.

  12. The Potential for Dams to Impact Lowland Meandering River Floodplain Geomorphology

    PubMed Central

    Marren, Philip M.; Grove, James R.; Webb, J. Angus; Stewardson, Michael J.

    2014-01-01

    The majority of the world's floodplains are dammed. Although some implications of dams for riverine ecology and for river channel morphology are well understood, there is less research on the impacts of dams on floodplain geomorphology. We review studies from dammed and undammed rivers and include influences on vertical and lateral accretion, meander migration and cutoff formation, avulsion, and interactions with floodplain vegetation. The results are synthesized into a conceptual model of the effects of dams on the major geomorphic influences on floodplain development. This model is used to assess the likely consequences of eight dam and flow regulation scenarios for floodplain geomorphology. Sediment starvation downstream of dams has perhaps the greatest potential to impact on floodplain development. Such effects will persist further downstream where tributary sediment inputs are relatively low and there is minimal buffering by alluvial sediment stores. We can identify several ways in which floodplains might potentially be affected by dams, with varying degrees of confidence, including a distinction between passive impacts (floodplain disconnection) and active impacts (changes in geomorphological processes and functioning). These active processes are likely to have more serious implications for floodplain function and emphasize both the need for future research and the need for an “environmental sediment regime” to operate alongside environmental flows. PMID:24587718

  13. Rock Mass Behavior Under Hydropower Embankment Dams: A Two-Dimensional Numerical Study

    NASA Astrophysics Data System (ADS)

    Bondarchuk, A.; Ask, M. V. S.; Dahlström, L.-O.; Nordlund, E.

    2012-09-01

    Sweden has more than 190 large hydropower dams, of which about 50 are pure embankment dams and over 100 are concrete/embankment dams. This paper presents results from conceptual analyses of the response of typical Swedish rock mass to the construction of a hydropower embankment dam and its first stages of operation. The aim is to identify locations and magnitudes of displacements that are occurring in the rock foundation and grout curtain after construction of the dam, the first filling of its water reservoir, and after one seasonal variation of the water table. Coupled hydro-mechanical analysis was conducted using the two-dimensional distinct element program UDEC. Series of the simulations have been performed and the results show that the first filling of the reservoir and variation of water table induce largest magnitudes of displacement, with the greatest values obtained from the two models with high differential horizontal stresses and smallest spacing of sub-vertical fractures. These results may help identifying the condition of the dam foundation and contribute to the development of proper maintenance measures, which guarantee the safety and functionality of the dam. Additionally, newly developed dams may use these results for the estimation of the possible response of the rock foundation to the construction.

  14. Dynamic analysis of an inflatable dam subjected to a flood

    NASA Astrophysics Data System (ADS)

    Lowery, K.; Liapis, S.

    A dynamic simulation of the response of an inflatable dam subjected to a flood is carried out to determine the survivability envelope of the dam where it can operate without rupture, or overflow. The free-surface flow problem is solved in two dimensions using a fully nonlinear mixed Eulerian-Lagrangian formulation. The dam is modeled as an elastic shell inflated with air and simply supported from two points. The finite element method is employed to determine the dynamic response of the structure using ABAQUS with a shell element. The problem is solved in the time domain which allows the prediction of a number of transient phenomena such as the generation of upstream advancing waves, the dynamic structural response and structural failure. Failure takes place when the dam either ruptures or overflows. Stresses in the dam material were monitored to determine when rupture occurs. An iterative study was performed to find the serviceability envelope of the dam in terms of the internal pressure and the flood Froude number for two flood depths. It was found that existing inflatable dams are quite effective in suppressing floods for a relatively wide range of flood velocities.

  15. The socio-economics dynamics of Dam on Rural Communities: A case study of Oyan Dam, Nigeria

    NASA Astrophysics Data System (ADS)

    Ayeni, Amidu; Ojifo, Lawrence

    2018-06-01

    Dams construction and operations have many benefits, nevertheless, they have also led to lots of negative social, health and human impacts. It is based on this that this study assesses the potential and socio-economics dynamics of Oyan dam between 1980 and 2016. The data used for this study include water level and discharge records of the dam between 2007 and 2016, Landsat imageries of 1984 and 2016 and socio-economic datasets for the period. Analysis of the dam potentials (water supply, agriculture and hydropower) and socio-economic impacts of the dam were carried out using basic statistical tools, land use change anaysis and field survey using questionnaire, structured interview with major stakeholders and personal observation. The results revealed that the water level and storage of the Oyan dam had a relative reduction of about 2 % as well as non-stationarity pattern of water abstraction and production for the period. The landuse classes show all classes decreased in extent except the cultivated landuse that acrued an increased of 19.9 % between 1984 and 2016. Furthermore, commercial water supply varied significantly between 2010 and 2016 while irrigation scheme is grossly under-utilized from the inception in 1983 to 2016. Finally, the result of socio-economic impacts revealed that majority of the selected communities' members are actually not benefiting from the dam and their livelihoods are not from the dam.

  16. Decision Support System for Reservoir Management and Operation in Africa

    NASA Astrophysics Data System (ADS)

    Navar, D. A.

    2016-12-01

    Africa is currently experiencing a surge in dam construction for flood control, water supply and hydropower production, but ineffective reservoir management has caused problems in the region, such as water shortages, flooding and loss of potential hydropower generation. Our research aims to remedy ineffective reservoir management by developing a novel Decision Support System(DSS) to equip water managers with a technical planning tool based on the state of the art in hydrological sciences. The DSS incorporates a climate forecast model, a hydraulic model of the watershed, and an optimization model to effectively plan for the operation of a system of cascade large-scale reservoirs for hydropower production, while treating water supply and flood control as constraints. Our team will use the newly constructed hydropower plants in the Omo Gibe basin of Ethiopia as the test case. Using the basic HIDROTERM software developed in Brazil, the General Algebraic Modeling System (GAMS) utilizes a combination of linear programing (LP) and non-linear programming (NLP) in conjunction with real time hydrologic and energy demand data to optimize the monthly and daily operations of the reservoir system. We compare the DSS model results with the current reservoir operating policy used by the water managers of that region. We also hope the DSS will eliminate the current dangers associated with the mismanagement of large scale water resources projects in Africa.

  17. 6. View of turbine pit at unit 3 showing servomotor ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. View of turbine pit at unit 3 showing servo-motor head (left of center) with piston rods bolted to turbine gate operation ring (right foreground). View to southeast. - Holter Hydroelectric Facility, Dam & Power House, End of Holter Dam Road, Wolf Creek, Lewis and Clark County, MT

  18. Estimation of natural historical flows for the Manitowish River near Manitowish Waters, Wisconsin

    USGS Publications Warehouse

    Juckem, Paul F.; Reneau, Paul C.; Robertson, Dale M.

    2012-01-01

    The Wisconsin Department of Natural Resources is charged with oversight of dam operations throughout Wisconsin and is considering modifications to the operating orders for the Rest Lake Dam in Vilas County, Wisconsin. State law requires that the operation orders be tied to natural low flows at the dam. Because the presence of the dam confounds measurement of natural flows, the U.S. Geological Survey, in cooperation with the Wisconsin Department of Natural Resources, installed streamflow-gaging stations and developed two statistical methods to improve estimates of natural flows at the Rest Lake Dam. Two independent methods were used to estimate daily natural flow for the Manitowish River approximately 1 mile downstream of the Rest Lake Dam. The first method was an adjusted drainage-area ratio method, which used a regression analysis that related measured water yield (flow divided by watershed area) from short-term (2009–11) gaging stations upstream of the Manitowish Chain of Lakes to the water yield from two nearby long-term gaging stations in order to extend the flow record (1991–2011). In this approach, the computed flows into the Chain of Lakes at the upstream gaging stations were multiplied by a coefficient to account for the monthly hydrologic contributions (precipitation, evaporation, groundwater, and runoff) associated with the additional watershed area between the upstream gaging stations and the dam at the outlet of the Chain of Lakes (Rest Lake Dam). The second method used to estimate daily natural flow at the Rest Lake Dam was a water-budget approach, which used lake stage and dam outflow data provided by the dam operator. A water-budget model was constructed and then calibrated with an automated parameter-estimation program by matching simulated flow-duration statistics with measured flow-duration statistics at the upstream gaging stations. After calibration of the water-budget model, the model was used to compute natural flow at the dam from 1973 to 2011. Daily natural flows at the dam, as computed by the adjusted drainage-area ratio method and the water-budget method, were used to compute monthly flow-duration values for the period of historical data available for each method. Monthly flow-durations provide a means for evaluating the frequency and range in flows that have been observed for each month over the course of many years. Both methods described the pattern and timing of measured high-flow and low-flow events at the upstream gaging stations. The adjusted drainage-area ratio method generally had smaller residual errors across the full range of observed flows and had smaller monthly biases than the water-budget method. Although it is not possible to evaluate which method may be more "correct" for estimating monthly natural flows at the dam, comparisons between the results of each method indicate that the adjusted drainage-area ratio method may be susceptible to biases at high flows due to isolated storms outside of the Manitowish River watershed. Conversely, it appears that the water-budget method may be susceptible to biases at low flows because of its sensitivity to the accuracy of reported lake stage and outflows, as well as effects of upstream diversions that could not be fully compensated for with this method. Results from both methods are useful for understanding the natural flow patterns at the dam. Flows for both methods have similar patterns, with high median flows in spring and low median flows in late summer. Similarly, the range from monthly high-flow durations to low-flow durations increases during spring, decreases during summer, and increases again during fall. These seasonal patterns illustrate a challenge with interpreting a single value of natural low flow. That is, a natural low flow computed for September is not representative of a natural low flow in April. Moreover, alteration of natural flows caused by storing water in the Chain of Lakes during spring and releasing it in fall causes a change in the timing of high and low flows compared with natural conditions. That is, the lowest reported dam outflows occurred in spring and highest reported outflows occurred in fall, which is opposite the natural patterns.

  19. Identification of Natural Oscillation Modes for Purposes of Seismic Assessment and Monitoring of HPP Dams

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kuz’menko, A. P., E-mail: apkuzm@gmail.com; Saburov, S. V., E-mail: saburov58@yandex.ru

    2016-07-15

    The paper puts forward a method for processing data from detailed seismic assessments of HPP dams (dynamic tests). A detailed assessment (hundreds of observation points in dam galleries) is performed with consideration of operating dam equipment and the microseismic noise. It is shown that dynamic oscillation characteristics (natural oscillation frequencies and modes in the main dam axes, the velocities of propagation of elastic waves with given polarization, and so on.) can be determined with sufficient accuracy by using complex transfer functions and pulse characteristics. Monitoring data is processed using data from a detailed assessment, taking account of identified natural oscillationmore » modes and determined ranges of natural frequencies. The spectra of characteristic frequencies thus obtained are used to choose substitution models and estimate the elastic characteristics of the “dam – rock bed” construction system, viz., the modulus of elasticity (the Young modulus), the Poisson ratio, the dam section stiffness with respect to shear, tension and compression and the elastic characteristics of the rock foundation.« less

  20. Relation between selected water-quality variables and lake level in Upper Klamath and Agency Lakes, Oregon

    USGS Publications Warehouse

    Wood, Tamara M.; Fuhrer, Gregory J.; Morace, Jennifer L.

    1996-01-01

    Based on the analysis of data that they have been collecting for several years, the Klamath Tribes recently recommended that the Bureau of Reclamation (Reclamation) modify the operating plan for the dam to make the minimum lake levels for the June-August period more closely resemble pre-dam conditions (Jacob Kann, written commun., 1995). The U.S. Geological Survey (USGS) was asked to analyze the available data for the lake and to assess whether the evidence exists to conclude that year-to-year differences in certain lake water-quality variables are related to year-to-year differences in lake level. The results of the analysis will be used as scientific input in the process of developing an operating plan for the Link River Dam.

  1. Historical physical and chemical data for water in Lake Powell and from Glen Canyon Dam releases, Utah-Arizona, 1964–2012

    USGS Publications Warehouse

    Vernieu, William S.

    2013-01-01

    This report presents the physical and chemical characteristics of water in Lake Powell and from Glen Canyon Dam releases from 1964 through 2012. These data are available in a several electronic formats. Data have been collected throughout this period by various offices of the Bureau of Reclamation and U.S. Geological Survey and are compiled to represent the existing body of chemical and physical information on Lake Powell and Glen Canyon Dam releases. From this record, further interpretation may be made concerning mixing processes in Lake Powell, the movement and fate of advective inflow currents, effects of climate and hydrological variations, and the effects of the operation and structure of Glen Canyon Dam on the quality of water in Lake Powell and from Glen Canyon Dam releases.

  2. McNary Dam, Ice Harbor Dam, and Lower Monumental Dam Smolt Monitoring Program; 1996 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hillson, Todd; Lind, Sharon; Price, William

    1997-07-01

    The Washington Department of Fish & Wildlife (WDFW) assumed responsibility for the Smolt Monitoring Program at McNary Dam on the Columbia River in 1990 and at the new juvenile collection facility at Lower Monumental Dam on the Snake River in 1993. In 1996, Smolt Monitoring Program activities also began at the new juvenile collection facility located at Ice Harbor Dam. This report summarizes the 1996 Smolt Monitoring work at all three sites. The work at Ice Harbor consisted of Gas Bubble Trauma (GBT) monitoring only. In general, the 1996 passage season at both the McNary and Lower Monumental sites canmore » be characterized by reduced passage of juveniles through the collection systems due to elevated river flows and spill, and low (<1%) overall facility mortality rates most likely resulting from cooler water temperatures. In accordance with the National Marine Fisheries Service recommendations (NMFS, 1995) all spring migrants were bypassed at McNary Dam in 1996. Mechanical problems within the McNary collection system resulted in collection and sampling activities being delayed until April 18 at this site, while sampling and collection began on the scheduled starting date of April 1 at Lower Monumental Dam. Monitoring operations were conducted through December 14 at McNary Dam and through October 28 at Lower Monumental Dam. An ongoing transportation evaluation summer migrant marking program was conducted at McNary Dam in 1996 by the NMFS. This necessitated the sampling of 394,211 additional fish beyond the recommended sampling guidelines. All total, 509,237 and 31,219 juvenile salmonids were anesthetized and individually counted, examined for scale loss, injuries, and brands by WDFW Smolt Monitoring personnel in 1996 at McNary Dam and Lower Monumental Dam, respectively.« less

  3. Importance of using roller compacted concrete in techno-economic investigation and design of small dams

    NASA Astrophysics Data System (ADS)

    Rouissat, Bouchrit; Smail, N.; Zenagui, S.

    2017-12-01

    In recent years, and under constraints caused by persistent drought, Algeria has launched a new mobilization strategy for surface water resources from small and medium dams. However, by making a review of the studies and achievements of twenty small dams in the west of Algeria, some deficiencies appeared. In addition to reservoir siltation assessment, operation spillways have been the major constraint on the reliability of these types of dams. The objective of this paper is to use the roller compacted concrete (RCC) for small dams' design for the benefit it offers and its ability to incorporate spillways. The development of this reflection was applied to the Khneg Azir earth dam situated in southwest of Algeria. Its uncontrolled lateral spillway has registered significant damage following the flood of October 2005, amounted, at that time, to more than 100 million Algerian dinars (1 million US Dollars). The present research encompasses a technical and economical comparative analysis concerning multiple criteria dam design types coupled with the conjugation of the spillways. Thus, on the basis of financial estimates calculated for all design types, the variant RCC remains competitive with that of the earth dam's spillway isolated (Less than 40% of the cost). To assess the mechanical behavior of the foundations for both types of dams, (earth and RCC dams), numerical modeling has been undertaken, according to the comparative analysis of deformations in the foundations. Analysis of deformations showed that the average foundation deformations was between (0.052-0.85) m for earth dam and (0.023-0.373) m for RCC dam. These economical and technical considerations open up important prospects for the use of RCC in the design of small dams.

  4. Simulation analysis of temperature control on RCC arch dam of hydropower station

    NASA Astrophysics Data System (ADS)

    XIA, Shi-fa

    2017-12-01

    The temperature analysis of roller compacted concrete (RCC) dam plays an important role in their design and construction. Based on three-dimensional finite element method, in the computation of temperature field, many cases are included, such as air temperature, elevated temperature by cement hydration heat, concrete temperature during placing, the influence of water in the reservoir, and boundary temperature. According to the corresponding parameters of RCC arch dam, the analysis of temperature field and stress field during the period of construction and operation is performed. The study demonstrates that detailed thermal stress analysis should be performed for RCC dams to provide a basis to minimize and control the occurrence of thermal cracking.

  5. Factors influencing movement of two migratory fishes within the tailrace of a large neotropical dam and their implications for hydropower impacts

    USGS Publications Warehouse

    Suzuki, F. M.; Dunham, Jason B.; Silva, L. G. M.; Alves, C. B. M.; Pompeu, P.S.

    2017-01-01

    Fish attempting to move upstream through hydroelectric dams can be trapped and killed in turbines. Understanding fish movement patterns can provide useful insights for how to manage dam operations to minimize fish kill in turbines. We evaluated the movements of two migratory fish (Curimba-Prochilodus argenteus and Mandi-Pimelodus maculatus) using acoustic telemetry in the tailrace of Três Marias Dam (São Francisco River, Brazil) from 31 October 2011 to 16 February 2012. The majority of tagged fish left the tailrace in less than one week; however, some individuals returned, performing several visits to the tailrace. Mandi remained longer in the tailrace than Curimba. The number of visits was influenced by diel period, turbine and spillway discharge. Although the diel period was the only important contributor to the visits performed by Curimba, the movements of Mandi were significantly influenced by three factors. We found that whereas Curimba was predominantly diurnal, Mandi showed nocturnal habits. Additionally, visits of Mandi were significantly greater during higher turbine and spillway discharge. We discuss the implications of these results for understanding fish movements in the Três Marias Dam tailrace and their potential implications for adapting hydroelectric operations to minimize fish kills.

  6. Passage and survival probabilities of juvenile Chinook salmon at Cougar Dam, Oregon, 2012

    USGS Publications Warehouse

    Beeman, John W.; Evans, Scott D.; Haner, Philip V.; Hansel, Hal C.; Hansen, Amy C.; Smith, Collin D.; Sprando, Jamie M.

    2014-01-01

    This report describes studies of juvenile-salmon dam passage and apparent survival at Cougar Dam, Oregon, during two operating conditions in 2012. Cougar Dam is a 158-meter tall rock-fill dam used primarily for flood control, and passes water through a temperature control tower to either a powerhouse penstock or to a regulating outlet (RO). The temperature control tower has moveable weir gates to enable water of different elevations and temperatures to be drawn through the dam to control water temperatures downstream. A series of studies of downstream dam passage of juvenile salmonids were begun after the National Oceanic and Atmospheric Administration determined that Cougar Dam was impacting the viability of anadromous fish stocks. The primary objectives of the studies described in this report were to estimate the route-specific fish passage probabilities at the dam and to estimate the survival probabilities of fish passing through the RO. The first set of dam operating conditions, studied in November, consisted of (1) a mean reservoir elevation of 1,589 feet, (2) water entering the temperature control tower through the weir gates, (3) most water routed through the turbines during the day and through the RO during the night, and (4) mean RO gate openings of 1.2 feet during the day and 3.2 feet during the night. The second set of dam operating conditions, studied in December, consisted of (1) a mean reservoir elevation of 1,507 ft, (2) water entering the temperature control tower through the RO bypass, (3) all water passing through the RO, and (4) mean RO gate openings of 7.3 feet during the day and 7.5 feet during the night. The studies were based on juvenile Chinook salmon (Oncorhynchus tshawytscha) surgically implanted with radio transmitters and passive integrated transponder (PIT) tags. Inferences about general dam passage percentage and timing of volitional migrants were based on surface-acclimated fish released in the reservoir. Dam passage and apparent survival probabilities were estimated using the Route-Specific-Survival Model with data from surface-acclimated fish released near the water surface directly upstream of the temperature control tower (treatment group) and slightly downstream of the dam (control group). In this study, apparent survival is the joint probability of surviving and migrating through the study area during the life of the transmitters. Two rearing groups were used to enable sufficient sample sizes for the studies. The groups differed in feed type, and for the December study only, the rearing location. Fish from each group were divided nearly equally among all combinations of release sites, release times, and surgeons. The sizes, travel times, and survivals of the two rearing groups were similar. There were statistical differences in fish lengths and travel times of the two groups, but they were small and likely were not biologically meaningful. There also was evidence of a difference in single-release estimates of survival between the rearing groups during the December study, but the differences had little effect on the relative survival estimates so the analyses of passage and survival were based on data from the rearing groups pooled. Conditions during the December study were more conducive to passing volitionally migrating fish than conditions during the November study. The passage percentage of the fish released in the reservoir was similar between studies (about 70 percent), but the passage occurred in a median of 1.0 day during the December study and a median of 9.3 days during the November study. More than 93 percent of the dam passage of volitionally migrating fish occurred at night during each study. This finding corroborates results of previous studies at Cougar Dam and suggests that the operating conditions at night are most important to volitionally migrating fish, given the current configuration of the dam. Most fish released near the temperature control tower passed through the RO. A total of 92.2 percent of the treatment group passed through the RO during the November study and the RO was the only route open during the December study. The assumptions of the survival model were either met or adjusted for during each study. There was little evidence that tagger skill or premature failure of radio transmitters had an effect on survival estimates. There were statistically significant differences in travel times between treatment and control groups through several of the river reaches they had in common, but the differences were typically only a few hours, and the two groups likely experienced the same in-river conditions. There was direct evidence of bias due to detection of euthanized fish with live transmitters released as part of the study design. The bias was ameliorated by adjusting the survival estimates for the probability of detecting dead fish with live transmitters, which reduced the estimated survival probabilities by about 0.02. The data and models indicated that the treatment effect was not fully expressed until the study reach terminating with Marshall Island Park on the Willamette River, a distance of 105.8 kilometers downstream of Cougar Dam. This was the first reach in which the 95-percent confidence interval of the estimated reach-specific relative survival overlapped 1.0, indicating similar survival of treatment and control groups. The median travel time of the treatment group from release to Marshall Island Park was 1.64 days during the November study and 1.36 days during the December study. The survival probability of fish that passed into the RO was greater during the December study than during the November study. The relative survival probability of fish passing through the RO was 0.4594 (standard error [SE] 0.0543) during the November study and 0.7389 (SE 0.1160) during the December study. These estimates represent relative survival probabilities from release near Cougar Dam to the Marshall Island site. The estimated survival probability of RO passage was lower than previous studies based on balloon and PIT tags, but higher than a similar study based on radio transmitters. We suggest that, apart from dam operations, the differences in survival primarily are due to the release location. We hypothesize that the balloon- and PIT-tagged fish released through a hose at a point near the RO gate opening experienced more benign conditions than the radio-tagged fish passing the RO volitionally. This hypothesis could be tested with further study. An alternative hypothesis is that some live fish remained within the study area beyond the life of their radio transmitter. The results from these and previous studies indicate that entrainment and survival of juvenile salmonids passing Cougar Dam varies with dam operating conditions. The condition most conducive to dam passage has been the discharge and low pool elevation condition tested during December 2012. That condition included large RO gate openings and was the condition with the highest dam passage survival.

  7. Evaluation of a Prototype Surface Flow Bypass for Juvenile Salmon and Steelhead at the Powerhouse of Lower Granite Dam, Snake River, Washington, 1996-2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.; Anglea, Steven M.; Adams, Noah S.

    2005-02-28

    A surface flow bypass provides a route in the upper water column for naturally, surface-oriented juvenile salmonids to safely migrate through a hydroelectric dam. Surface flow bypasses were recommended in several regional salmon recovery plans as a means to increase passage survival of juvenile salmonids at Columbia and Snake River dams. A prototype surface flow bypass, called the SBC, was retrofit on Lower Granite Dam and evaluated from 1996 to 2000 using biotelemetry and hydroacoustic techniques. In terms of passage efficiency, the best SBC configurations were a surface skimmer (99 m3/s [3,500 cfs], three entrances 5 m wide, 5 mmore » deep and one entrance 5 m wide, 15 m deep) and a single chute (99 m3/s, one entrance 5 m wide, 8.5 m deep). They each passed 62 ? 3% (95% confidence interval) of the total juvenile fish population that entered the section of the dam with the SBC entrances (Turbine Units 4-5). Smooth entrance shape and concentrated surface flow characteristics of these configurations are worth pursuing in designs for future surface flow bypasses. In addition, a guidance wall in the Lower Granite Dam forebay diverted the following percentages of juvenile salmonids away from Turbine Units 1-3 toward other passage routes, including the SBC: run-at-large 79 ? 18%; hatchery steelhead 86%; wild steelhead 65%; and yearling chinook salmon 66%. When used in combination with spill or turbine intake screens, a surface flow bypass with a guidance wall can produce a high level (> 90% of total project passage) of non-turbine passage and provide operational flexibility to fisheries managers and dam operators responsible for enhancing juvenile salmonid survival.« less

  8. The influence of controlled floods on fine sediment storage in debris fan-affected canyons of the Colorado River basin

    USGS Publications Warehouse

    Mueller, Erich R.; Grams, Paul E.; Schmidt, John C.; Hazel, Joseph E.; Alexander, Jason S.; Kaplinski, Matt

    2014-01-01

    Prior to the construction of large dams on the Green and Colorado Rivers, annual floods aggraded sandbars in lateral flow-recirculation eddies with fine sediment scoured from the bed and delivered from upstream. Flows greater than normal dam operations may be used to mimic this process in an attempt to increase time-averaged sandbar size. These controlled floods may rebuild sandbars, but sediment deficit conditions downstream from the dams restrict the frequency that controlled floods produce beneficial results. Here, we integrate complimentary, long-term monitoring data sets from the Colorado River in Marble and Grand Canyons downstream from Glen Canyon dam and the Green River in the Canyon of Lodore downstream from Flaming Gorge dam. Since the mid-1990s, several controlled floods have occurred in these canyon rivers. These controlled floods scour fine sediment from the bed and build sandbars in eddies, thus increasing channel relief. These changes are short-lived, however, as interflood dam operations erode sandbars within several months to years. Controlled flood response and interflood changes in bed elevation are more variable in Marble Canyon and Grand Canyon, likely reflecting more variable fine sediment supply and stronger transience in channel bed sediment storage. Despite these differences, neither system shows a trend in fine-sediment storage during the period in which controlled floods were monitored. These results demonstrate that controlled floods build eddy sandbars and increase channel relief for short interflood periods, and this response may be typical in other dam-influenced canyon rivers. The degree to which these features persist depends on the frequency of controlled floods, but careful consideration of sediment supply is necessary to avoid increasing the long-term sediment deficit.

  9. Survival of Atlantic salmon Salmo salar smolts through a hydropower complex.

    PubMed

    Stich, D S; Bailey, M M; Zydlewski, J D

    2014-10-01

    This study evaluated Atlantic salmon Salmo salar smolt survival through the lower Penobscot River, Maine, U.S.A., and characterized relative differences in proportional use and survival through the main-stem of the river and an alternative migration route, the Stillwater Branch. The work was conducted prior to removal of two main-stem dams and operational changes in hydropower facilities in the Stillwater Branch. Survival and proportional use of migration routes in the lower Penobscot were estimated from multistate (MS) models based on 6 years of acoustic telemetry data from 1669 smolts and 2 years of radio-telemetry data from 190 fish. A small proportion (0·12, 95% c.i. = 0·06-0·25) of smolts used the Stillwater Branch, and mean survival through the two operational dams in this part of the river was relatively high (1·00 and 0·97). Survival at Milford Dam, the dam that will remain in the main-stem of the Penobscot River, was relatively low (0·91), whereas survival through two dams that were removed was relatively high (0·99 and 0·98). Smolt survival could decrease in the Stillwater Branch with the addition of two new powerhouses while continuing to meet fish passage standards. The effects of removing two dams in the main-stem are expected to be negligible for smolt survival based on high survival observed from 2005 to 2012 at those locations. Survival through Milford Dam was been well below current regulatory standards, and thus improvement of passage at this location offers the best opportunity for improving overall smolt survival in the lower river. © 2014 The Fisheries Society of the British Isles.

  10. Survival of Atlantic salmon Salmo salar smolts through a hydropower complex

    USGS Publications Warehouse

    Stich, D.S.; Bailey, M.M.; Zydlewski, Joseph D.

    2014-01-01

    This study evaluated Atlantic salmon Salmo salar smolt survival through the lower Penobscot River, Maine, U.S.A., and characterized relative differences in proportional use and survival through the main-stem of the river and an alternative migration route, the Stillwater Branch. The work was conducted prior to removal of two main-stem dams and operational changes in hydropower facilities in the Stillwater Branch. Survival and proportional use of migration routes in the lower Penobscot were estimated from multistate (MS) models based on 6 years of acoustic telemetry data from 1669 smolts and 2 years of radio-telemetry data from 190 fish. A small proportion (0·12, 95% c.i. = 0·06–0·25) of smolts used the Stillwater Branch, and mean survival through the two operational dams in this part of the river was relatively high (1·00 and 0·97). Survival at Milford Dam, the dam that will remain in the main-stem of the Penobscot River, was relatively low (0·91), whereas survival through two dams that were removed was relatively high (0·99 and 0·98). Smolt survival could decrease in the Stillwater Branch with the addition of two new powerhouses while continuing to meet fish passage standards. The effects of removing two dams in the main-stem are expected to be negligible for smolt survival based on high survival observed from 2005 to 2012 at those locations. Survival through Milford Dam was been well below current regulatory standards, and thus improvement of passage at this location offers the best opportunity for improving overall smolt survival in the lower river.

  11. Effect of Dam operation on monthly and annual trends of flow discharge in the Qom Rood Watershed, Iran

    NASA Astrophysics Data System (ADS)

    Yaghmaei, Hiva; Sadeghi, Seyed Hamidreza; Moradi, Hamidreza; Gholamalifard, Mehdi

    2018-02-01

    Trends in flow discharge, temperature and rainfall from the Qom Rood Watershed, Iran, for a period of 1979-2016 were analyzed at monthly and annual time scales. Trend analyses were conducted using the Mann-Kendall test, the double-mass curve of mean annual discharge versus rainfall, and rainfall-runoff relationship before and after the 15 Khordad Dam operation. Multiple regression of flow discharge against rainfall and temperature was used to determine the residual trend at four meteorological and hydrological stations located upstream and downstream of the Qom Rood Watershed. Results showed that the temperature at the upstream and downstream stations did not have any significant trend, but a significant decreasing trend (P < .05) in rainfall was detected only in May (z = -1.66) at the downstream stations. There was a significant positive trend (P < .05) in rainfall in February (z = 2.22) and July (z = 2.15) at the upstream stations, and in October (z = 2.3) and November (z = 1.8) at the downstream stations. However, there was a noticeable decrease in monthly and annual flow discharge, and residual trend at 99% significance level at the downstream stations. At the upstream stations, the flow discharges had significant (P < .05) declining trend in all months, but annual flow discharge did not change significantly. Analysis of double mass curve between runoff and rainfall at the downstream stations showed an inconsistency in the line slope concordant with the time of 15 Khordad Dam operation. Annual mean discharge at the upstream stations did not show a significant change before and after 15 Khordad Dam operation. However, annual flow magnitude decreased significantly by 87.5 and 81.7% in Shad Abad and KoohSefid, respectively. These results confirmed that natural driving forces did not affect flow discharge changes and the observed decreasing tendency in flow discharge at the downstream stations was due to 15 Khordad Dam, and at the upstream stations due to diversion/storage dams. These findings highlighted the role of human interference in changing the hydrologic regime in the study area based on which appropriate adaptive decisions can be made.

  12. Are large-scale manipulations of streamflow for ecological outcomes effective either as experiments or management actions? (Invited)

    NASA Astrophysics Data System (ADS)

    Konrad, C. P.; Olden, J.

    2013-12-01

    Dams impose a host of impacts on freshwater and estuary ecosystems. In recent decades, dam releases for ecological outcomes have been increasingly implemented to mitigate for these impacts and are gaining global scope. Many are designed and conducted using an experimental framework. A recent review of large-scale flow experiments (FE) evaluates their effectiveness and identifies ways to enhance their scientific and management value. At least 113 large-scale flow experiments affecting 98 river systems globally have been documented over the last 50 years. These experiments span a range of flow manipulations from single pulse events to comprehensive changes in flow regime across all seasons and different water year types. Clear articulation of experimental objectives, while not universally practiced, was crucial for achieving management outcomes and changing dam operating policies. We found a strong disparity between the recognized ecological importance of a multi faceted flow regimes and discrete flow events that characterized 80% of FEs. Over three quarters of FEs documented both abiotic and biotic outcomes, but only one third examined multiple trophic groups, thus limiting how this information informs future dam management. Large-scale flow experiments represent a unique opportunity for integrated biophysical investigations for advancing ecosystem science. Nonetheless, they must remain responsive to site-specific issues regarding water management, evolving societal values and changing environmental conditions and, in particular, can characterize the incremental benefits from and necessary conditions for changing dam operations to improve ecological outcomes. This type of information is essential for understanding the full context of value based trade-offs in benefits and costs from different dam operations that can serve as an empirical basis for societal decisions regarding water and ecosystem management. FE may be the best approach available to managers for resolving critical uncertainties that impede decision making in adaptive settings, for example, when we lack sufficient understanding to model biophysical responses to alternative operations. Integrated long term monitoring of biotic abiotic responses and defining clear management based objectives highlight ways for improving the efficiency and value of FEs.

  13. The effects of overwinter flowson the spring condition of rainbow and brown trout size classes in the Green River downstream of Flaming Gorge Dam, Utah.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Magnusson, A. K.; LaGory, K. E.; Hayse, J. W.

    2010-06-25

    Flaming Gorge Dam, a hydroelectric facility operated by the Bureau of Reclamation (Reclamation), is located on the Green River in Daggett County, northeastern Utah. Until recently, and since the early 1990s, single daily peak releases or steady flows have been the operational pattern of the dam during the winter period. However, releases from Flaming Gorge Reservoir followed a double-peak pattern (two daily flow peaks) during the winters of 2006-2007 and 2008-2009. Because there is little recent long-term history of double-peaking at Flaming Gorge Dam, the potential effects of double-peaking operations on trout body condition in the dam's tailwater are notmore » known. A study plan was developed that identified research activities to evaluate potential effects from winter double-peaking operations (Hayse et al. 2009). Along with other tasks, the study plan identified the need to conduct a statistical analysis of historical trout condition and macroinvertebrate abundance to evaluate the potential effects of hydropower operations. The results from analyses based on the combined size classes of trout (85-630 mm) were presented in Magnusson et al. (2008). The results of this earlier analysis suggested possible relationships between trout condition and flow, but concern that some of the relationships resulted from size-based effects (e.g., apparent changes in condition may have been related to concomitant changes in size distribution, because small trout may have responded differently to flow than large trout) prompted additional analysis of within-size class relationships. This report presents the results of analyses of three different size classes of trout (small: 200-299 mm, medium: 300-399 mm, and large: {ge}400 mm body length). We analyzed historical data to (1) describe temporal patterns and relationships among flows, benthic macroinvertebrate abundance, and condition of brown trout (Salmo trutta) and rainbow trout (Oncorhynchus mykiss) in the tailwaters of Flaming Gorge Dam, and to (2) evaluate the relative importance of the effects of flow (i.e., flow volumes and flow variability), trout abundance (catch per unit effort [CPUE]), and benthic macroinvertebrate abundance on trout condition for different size classes of trout.« less

  14. Simulating future water temperatures in the North Santiam River, Oregon

    USGS Publications Warehouse

    Buccola, Norman; Risley, John C.; Rounds, Stewart A.

    2016-01-01

    A previously calibrated two-dimensional hydrodynamic and water-quality model (CE-QUAL-W2) of Detroit Lake in western Oregon was used in conjunction with inflows derived from Precipitation-Runoff Modeling System (PRMS) hydrologic models to examine in-lake and downstream water temperature effects under future climate conditions. Current and hypothetical operations and structures at Detroit Dam were imposed on boundary conditions derived from downscaled General Circulation Models in base (1990–1999) and future (2059–2068) periods. Compared with the base period, future air temperatures were about 2 °C warmer year-round. Higher air temperature and lower precipitation under the future period resulted in a 23% reduction in mean annual PRMS-simulated discharge and a 1 °C increase in mean annual estimated stream temperatures flowing into the lake compared to the base period. Simulations incorporating current operational rules and minimum release rates at Detroit Dam to support downstream habitat, irrigation, and water supply during key times of year resulted in lower future lake levels. That scenario results in a lake level that is above the dam’s spillway crest only about half as many days in the future compared to historical frequencies. Managing temperature downstream of Detroit Dam depends on the ability to blend warmer water from the lake’s surface with cooler water from deep in the lake, and the spillway is an important release point near the lake’s surface. Annual average in-lake and release temperatures from Detroit Lake warmed 1.1 °C and 1.5 °C from base to future periods under present-day dam operational rules and fill schedules. Simulated dam operations such as beginning refill of the lake 30 days earlier or reducing minimum release rates (to keep more water in the lake to retain the use of the spillway) mitigated future warming to 0.4 and 0.9 °C below existing operational scenarios during the critical autumn spawning period for endangered salmonids. A hypothetical floating surface withdrawal at Detroit Dam improved temperature control in summer and autumn (0.6 °C warmer in summer, 0.6 °C cooler in autumn compared to existing structures) without altering release rates or lake level management rules.

  15. Enumeration of Salmonids in the Okanogan Basin Using Underwater Video, Performance Period: October 2005 (Project Inception) - 31 December 2006.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Peter N.; Rayton, Michael D.; Nass, Bryan L.

    2007-06-01

    The Confederated Tribes of the Colville Reservation (Colville Tribes) identified the need for collecting baseline census data on the timing and abundance of adult salmonids in the Okanogan River Basin in order to determine basin and tributary-specific spawner distributions, evaluate the status and trends of natural salmonid production in the basin, document local fish populations, and augment existing fishery data. This report documents the design, installation, operation and evaluation of mainstem and tributary video systems in the Okanogan River Basin. The species-specific data collected by these fish enumeration systems are presented along with an evaluation of the operation of amore » facility that provides a count of fish using an automated method. Information collected by the Colville Tribes Fish & Wildlife Department, specifically the Okanogan Basin Monitoring and Evaluation Program (OBMEP), is intended to provide a relative abundance indicator for anadromous fish runs migrating past Zosel Dam and is not intended as an absolute census count. Okanogan Basin Monitoring and Evaluation Program collected fish passage data between October 2005 and December 2006. Video counting stations were deployed and data were collected at two locations in the basin: on the mainstem Okanogan River at Zosel Dam near Oroville, Washington, and on Bonaparte Creek, a tributary to the Okanogan River, in the town of Tonasket, Washington. Counts at Zosel Dam between 10 October 2005 and 28 February 2006 are considered partial, pilot year data as they were obtained from the operation of a single video array on the west bank fishway, and covered only a portion of the steelhead migration. A complete description of the apparatus and methodology can be found in 'Fish Enumeration Using Underwater Video Imagery - Operational Protocol' (Nass 2007). At Zosel Dam, totals of 57 and 481 adult Chinook salmon were observed with the video monitoring system in 2005 and 2006, respectively. Run timing for Chinook in 2006 indicated that peak passage occurred in early October and daily peak passage was noted on 5 October when 52 fish passed the dam. Hourly passage estimates of Chinook salmon counts for 2005 and 2006 at Zosel Dam revealed a slight diel pattern as Chinook passage events tended to remain low from 1900 hours to 0600 hours relative to other hours of the day. Chinook salmon showed a slight preference for passing the dam through the video chutes on the east bank (52%) relative to the west bank (48%). A total of 48 adult sockeye salmon in 2005 and 19,245 in 2006 were counted passing through the video chutes at Zosel Dam. The 2006 run timing pattern was characterized by a large peak in passage from 3 August through 10 August when 17,698 fish (92% of total run observed for the year) were observed passing through the video chutes. The daily peak of 5,853 fish occurred on 4 August. Hourly passage estimates of sockeye salmon counts for 2005 and 2006 at the dam showed a strong diel pattern with increased passage during nighttime hours relative to daytime hours. Sockeye showed a strong preference for passing Zosel Dam on the east bank (72%) relative to the west bank (28%). A total of 298 adult upstream-migrating steelhead were counted at Zosel Dam in 2005 and 2006, representing the 2006 cohort based on passage data from 5 October 2005 through 15 July 2006. Eighty-seven percent (87%) of the total steelhead observed passed the dam between 23 March and 25 April with a peak passage occurring on 6 April when 31 fish were observed. Steelhead passage at Zosel Dam exhibited no diel pattern. In contrast to both Chinook and sockeye salmon, steelhead were shown to have a preference for passing the dam on the west bank (71%) relative to the east bank (29%). Both Chinook and sockeye passage at Zosel Dam were influenced by Okanogan River water temperature. When water temperatures peaked in late July (daily mean exceeded 24 C and daily maximum exceeded 26.5 C), Chinook and sockeye counts went to zero. A subsequent decrease in water temperature resulted in sharp increases in both Chinook and sockeye passage. A total of six steelhead were observed with the video monitoring system at Bonaparte Creek in 2006, with three passage events occurring on 29 March and one each on 20, 21, and 23 April. This system was operational for only a portion of the migration.« less

  16. 24 CFR 203.43 - Eligibility of miscellaneous type mortgages.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Department of the Interior located within the town area of Coulee Dam, WA, acquired by the United States for the construction, operation, and maintenance of Grand Coulee Dam and its appurtenant works or of any... be located on the mortgaged property a dwelling unit designed principally for residential use for not...

  17. POLLUTION PREVENTION OPPORTUNITY ASSESSMENT OF THE UNITED STATES ARMY CORPS OF ENGINEERS GARRISON DAM HYDRO- ELECTRIC POWERPLANT - RIVERDALE, NORTH DAKOTA

    EPA Science Inventory

    The report describes the results of pollution prevention opportunity assessments conducted at a representative U.S. Army Corps of Engineers civil works dam and hydroelectric power plant. ecommended methods for reducing pollution resulting primarily from the operation of these fac...

  18. Investigating Groundwater/Surface Water Interaction at the Diversion Dam Site: Report Documentary 2007-2008

    DTIC Science & Technology

    2011-05-01

    operations, and soil properties. Key findings of this study indicate that soils within the study reach are conductive, with groundwater responding...16 3 Develop Detailed Map of Soils and Their Properties in Bosque Adjacent to...27 4 Evaluate Ecological Impact of River Levels, Soil Types, and Dam

  19. 78 FR 39315 - Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Workshops...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-01

    ... area relocations, and other alternative features; water operations-related effects within the reservoir... Sacramento-San Joaquin Delta watershed system by modifying the existing Shasta Dam and Reservoir to meet... enlarging Shasta Dam and Reservoir. Related legislation includes Title 34 of Public Law 102-575 (the Central...

  20. 78 FR 66911 - Notice of Availability of Draft Environmental Assessment; City of New York

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-07

    ... City of New York's existing Cannonsville Dam, which impounds its Cannonsville Water Supply Reservoir. The dam and reservoir are located on the West Branch of the Delaware River, near the Township of... EA) which analyzes the potential environmental effects of construction and operation of the project...

  1. The effects of Glen Canyon Dam operations on early life stages of rainbow trout in the Colorado River

    USGS Publications Warehouse

    Korman, Josh; Melis, Theodore S.

    2011-01-01

    The Lees Ferry reach of the Colorado River-a 16-mile segment from Glen Canyon Dam to the confluence with the Paria River-supports an important recreational rainbow trout (Oncorhynchus mykiss) fishery. In Grand Canyon, nonnative rainbow trout prey on and compete for habitat and food with native fish, such as the endangered humpback chub (Gila cypha). Experimental flow fluctuations from the dam during winter and spring 2003-5 dewatered and killed a high proportion of rainbow trout eggs in gravel spawning bars, but this mortality had no measurable effect on the abundance of juvenile fish. Flow fluctuations during summer months reduced growth of juvenile trout relative to steadier flows. A high-flow experiment in March 2008 increased both trout survival rates for early life stages and fish abundance. These findings demonstrate that Glen Canyon Dam operations directly affect the trout population in the Lees Ferry reach and could be used to regulate nonnative fish abundance to limit potential negative effects of trout on native fish in Grand Canyon.

  2. Multi-agent Water Resources Management

    NASA Astrophysics Data System (ADS)

    Castelletti, A.; Giuliani, M.

    2011-12-01

    Increasing environmental awareness and emerging trends such as water trading, energy market, deregulation and democratization of water-related services are challenging integrated water resources planning and management worldwide. The traditional approach to water management design based on sector-by-sector optimization has to be reshaped to account for multiple interrelated decision-makers and many stakeholders with increasing decision power. Centralized management, though interesting from a conceptual point of view, is unfeasible in most of the modern social and institutional contexts, and often economically inefficient. Coordinated management, where different actors interact within a full open trust exchange paradigm under some institutional supervision is a promising alternative to the ideal centralized solution and the actual uncoordinated practices. This is a significant issue in most of the Southern Alps regulated lakes, where upstream hydropower reservoirs maximize their benefit independently form downstream users; it becomes even more relevant in the case of transboundary systems, where water management upstream affects water availability downstream (e.g. the River Zambesi flowing through Zambia, Zimbabwe and Mozambique or the Red River flowing from South-Western China through Northern Vietnam. In this study we apply Multi-Agent Systems (MAS) theory to design an optimal management in a decentralized way, considering a set of multiple autonomous agents acting in the same environment and taking into account the pay-off of individual water users, which are inherently distributed along the river and need to coordinate to jointly reach their objectives. In this way each real-world actor, representing the decision-making entity (e.g. the operator of a reservoir or a diversion dam) can be represented one-to-one by a computer agent, defined as a computer system that is situated in some environment and that is capable of autonomous action in this environment in order to meet its design objectives. The proposed approach is numerically tested on a synthetic case study, characterized by two multi-purpose reservoirs in cascade, two diversion dams and four different conflicting water uses: hydropower energy production, drinking supply, flooding prevention along the reservoir shores and irrigation supply. The system is therefore composed by four agents: the two operators of the diversion dams, which are purely reactive agents since they simply respond directly to the environment, and the operators of the two reservoirs, which are more complex agents because they have an internal state and their decisions are taken according to a closed-loop control scheme. In particular, the set of agents can act considering only their own objectives or they can coordinate to jointly reach better compromise solutions. Different interaction scenarios between the two extreme behaviours of centralized management and completely non-cooperation are simulated and analysed.

  3. National Program for Inspection of Non-Federal Dams. Bearhole Reservoir (MA 00073), Westfield River Basin, West Springfield, Massachusetts. Phase I Inspection Report.

    DTIC Science & Technology

    1981-06-01

    SAutomatic . Manual I . Operative Yes I , No Co~ents: All controls operable per Water Departxent oersonnel. I Drawdown present Yes I , No Operative Yes_ , No... controls a 6-inch valve for dewatering the raw water wet well. One raw water supply gate was fully opened; the other opened 1-inch, and the 24-inch outlet...development). ,B- I B-2 w J---.-.z-- OtL ’S: OT7LET CONTROLS AND DRADMN Westerly end of dam - conc. overflow D.I. sluiceway No. Location and T7pe:I2

  4. Deformation Monitoring and Bathymetry Analyses in Rock-Fill Dams, a Case Study at Ataturk Dam

    NASA Astrophysics Data System (ADS)

    Kalkan, Y.; Bilgi, S.

    2014-12-01

    Turkey has 595 dams constructed between 1936 and 2013 for the purposes of irrigation, flood control, hydroelectric energy and drinking water. A major portion of the dam basins in Turkey are deprived of vegetation and have slope topography on near surrounding area. However, landscaping covered with forest around the dam basin is desirable for erosion control. In fact; the dams, have basins deprived of vegetation, fill up quickly due to sediment transport. Erosion control and forestation are important factors, reducing the sediment, to protect the water basins of the dams and increase the functioning life of the dams. The functioning life of dams is as important as the investment and construction. Nevertheless, in order to provide safety of human life living around, well planned monitoring is essential for dams. Dams are very large and critical structures and they demand the use or application of precise measuring systems. Some basic physical data are very important for assessing the safety and performance of dams. These are movement, water pressure, seepage, reservoir and tail-water elevations, local seismic activities, total pressure, stress and strain, internal concrete temperature, ambient temperature and precipitation. Monitoring is an essential component of the dam after construction and during operation and must en­able the timely detection of any behavior that could deteriorate the dam, potentially result in its shutdown or failure. Considering the time and labor consumed by long-term measurements, processing and analysis of measured data, importance of the small structural motions at regular intervals could be comprehended. This study provides some information, safety and the techniques about the deformation monitoring of the dams, dam safety and related analysis. The case study is the deformation measurements of Atatürk Dam in Turkey which is the 6th largest dam of world considering the filling volume of embankment. Brief information is given about the dam and the methods of monitoring techniques applied by various disciplines. Some results have been obtained from this method for nearly eight years are presented in this work. In addition, the results of bathymetric surveys between 2005 and 2010 will be compared using the cross sections where the maximum changes occurred on the dam bottom of the reservoir area.

  5. National Dam Safety Program. Missouri Power and Light Dam (MO 10065), Mississippi - Salt - Quincy River Basin, Audrain County, Missouri. Phase I Inspection Report.

    DTIC Science & Technology

    1978-12-01

    Audrain Stream : Unnamed Tributary of North Fork of Salt River Date of Inspection: September 29 and 30, 1978 Missouri Power and Light Dam No. Mo.10065...for a power plant, and the reser- voir is also used for recreation. The only operating facility at the darnsite is the pump station adjacent to the...identify due to heavy vegetation. 3. Generally unstable rock wall protecting the up- stream slope. 4. Extensive rodent activity throughout the embankment

  6. National Dam Safety Program. Moon Valley Dam (MO 11597), Missouri - Kansas City Basin, Boone County, Missouri. Phase I Inspection Report.

    DTIC Science & Technology

    1981-08-01

    Design 6 2.2 Construction 6 2.3 Operation 6 2.4 Geology 6 2.5 Evaluation 6 SECTION 3 - VISUAL INSPECTION 3.1 Findings 7 3.2 Evaluation 9 SECTION 4...Downstream of Dam 9 Erosion Behind East Wingwall 10 Erosion and Debris Behind West Wingwall 11 Diagonal Crack in East Wingwall 12 West Wingwall...2.0 H to approximately 1.0 V on 6.0 H. (6) Zoning - Unknown. (7) Impervious core - Unknown. (8) Cutoff - Unknown. ( 9 ) Grout curtain - Unknown. h

  7. Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival at John Day Dam, 2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weiland, Mark A.; Woodley, Christa M.; Ploskey, Gene R.

    This report presents survival, behavioral, and fish passage results for tagged yearling Chinook salmon and juvenile steelhead as part of a survival study conducted at John Day Dam during spring 2011. This study was designed to evaluate the passage and survival of yearling Chinook salmon and juvenile steelhead to assist managers in identifying dam operations for compliance testing as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the 2008 Columbia Basin Fish Accords. Survival estimates were based on a paired-release survival model.

  8. Application of remote sensing data for measuring freshwater ecosystems changes below the Zeya dam in the Russian Far East

    NASA Astrophysics Data System (ADS)

    Nikitina, Oxana I.; Bazarov, Kirill Y.; Egidarev, Evgeny G.

    2018-06-01

    The large Zeya hydropower dam is located on the Zeya River, the largest left-bank tributary of the Amur-Heilong River in Russia. The dam had been constructed by 1980 and its operation has significantly transformed the flow regime of the Zeya River. The flow regulation has reduced the magnitude of periodic flooding of the floodplain areas located downstream from the Zeya dam and disrupted habitats of flora and fauna. An estimation of the transformation of the freshwater ecosystems is required to develop measures necessary either to maintain or restore disrupted ecosystems. Application of remote sensing methods allows measuring characteristics of the ecosystem's components. Two sections of a floodplain below the Zeya dam were considered for analysis in order to detect changes in objects at each site during the comparison of remote data from 1969/1971 and 2016.

  9. Three Experimental High-Flow Releases from Glen Canyon Dam, Arizona-Effects on the Downstream Colorado River Ecosystem

    USGS Publications Warehouse

    Melis, Theodore S.; Grams, Paul E.; Kennedy, Theodore A.; Ralston, Barbara E.; Robinson, Christopher T.; Schmidt, John C.; Schmit, Lara M.; Valdez, Richard A.; Wright, Scott A.

    2011-01-01

    Three high-flow experiments (HFEs) were conducted by the U.S. Department of the Interior at Glen Canyon Dam, Arizona, in March 1996, November 2004, and March 2008. Also known as artificial or controlled floods, these scheduled releases of water above the dam's powerplant capacity were designed to mimic pre-dam seasonal flooding on the Colorado River. The goal of the HFEs was to determine whether high flows could be used to benefit important downstream resources in Glen Canyon National Recreation Area and Grand Canyon National Park that have been affected by the existence and operation of Glen Canyon Dam. These downstream resources include native fish, particularly endangered humpback chub (Gila cypha), terrestrial and aquatic sandbar habitats, cultural sites, and recreational resources. This Fact Sheet summarizes HFE-related studies published since 1996 and outlines a possible strategy for implementing future HFEs.

  10. Monitoring and Evaluation of Environmental Flow Prescriptions for Five Demonstration Sites of the Sustainable Rivers Project

    USGS Publications Warehouse

    Konrad, Christopher P.

    2010-01-01

    The Nature Conservancy has been working with U.S. Army Corps of Engineers (Corps) through the Sustainable Rivers Project (SRP) to modify operations of dams to achieve ecological objectives in addition to meeting the authorized purposes of the dams. Modifications to dam operations are specified in terms of environmental flow prescriptions that quantify the magnitude, duration, frequency, and seasonal timing of releases to achieve specific ecological outcomes. Outcomes of environmental flow prescriptions implemented from 2002 to 2008 have been monitored and evaluated at demonstration sites in five rivers: Green River, Kentucky; Savannah River, Georgia/South Carolina; Bill Williams River, Arizona; Big Cypress Creek, Texas; and Middle Fork Willamette River, Oregon. Monitoring and evaluation have been accomplished through collaborative partnerships of federal and state agencies, universities, and nongovernmental organizations.

  11. Factors affecting route selection and survival of steelhead kelts at Snake River dams in 2012 and 2013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harnish, Ryan A.; Colotelo, Alison H. A.; Li, Xinya

    2015-03-31

    In 2012 and 2013, Pacific Northwest National Laboratory (PNNL) conducted a study that summarized the passage route proportions and route-specific survival rates of steelhead kelts that passed through Federal Columbia River Power System (FCRPS) dams. To accomplish this, a total of 811 steelhead kelts were tagged with Juvenile Salmon Acoustic Telemetry System (JSATS) transmitters. Acoustic receivers, both autonomous and cabled, were deployed throughout the FCRPS to monitor the downstream movements of tagged kelts. Kelts were also tagged with passive integrated transponder tags to monitor passage through juvenile bypass systems (JBS) and detect returning fish. The current study evaluated data collectedmore » in 2012 and 2013 to identify environmental, temporal, operational, individual, and behavioral variables that were related to forebay residence time, route of passage, and survival of steelhead kelts at FCRPS dams on the Snake River. Multiple approaches, including 3-D tracking, bivariate and multivariable regression modeling, and decision tree analyses were used to identify the environmental, temporal, operational, individual, and behavioral variables that had the greatest effect on forebay residence time, route of passage, and route-specific and overall dam passage survival probabilities for tagged kelts at Lower Granite (LGR), Little Goose (LGS), and Lower Monumental (LMN) dams. In general, kelt behavior and discharge appeared to work independently to affect forebay residence times. Kelt behavior, primarily approach location, migration depth, and “searching” activities in the forebay, was found to have the greatest influence on their route of passage. The condition of kelts was the single most important factor affecting their survival. The information gathered in this study may be used by dam operators and fisheries managers to identify potential management actions to improve in-river survival of kelts or collection methods for kelt reconditioning programs to aid the recovery of Snake River steelhead populations.« less

  12. Ten years of the Three Gorges Dam: a call for policy overhaul

    NASA Astrophysics Data System (ADS)

    Yang, Xiankun; Lu, X. X.

    2013-12-01

    The Three Gorges Dam (TGD), the world’s largest source of ‘clean’ hydroelectric power (Shen and Xie 2004), has entered its tenth year after the first turbine went into operation in June 2003. The dam, with a generating capacity 20 times that of the United States’ Hoover Dam, has been hailed as a crucial part of a solution to China’s energy crisis. Despite great benefits, however, major concerns have been voiced over the disastrous environmental and social consequences of this massive engineering project (Stone 2011). In this paper, we review the benefits and impacts learned from the controversial megadam over the past decade and discuss perspective quests on policy overhaul for future environmental protection.

  13. A novel label-free fluorescence strategy for methyltransferase activity assay based on dsDNA-templated copper nanoparticles coupled with an endonuclease-assisted signal transduction system.

    PubMed

    Lai, Q Q; Liu, M D; Gu, C C; Nie, H G; Xu, X J; Li, Z H; Yang, Z; Huang, S M

    2016-02-21

    Evaluating DNA methyltransferase (MTase) activity has received considerable attention due to its significance in the fields of early cancer clinical diagnostics and drug discovery. Herein, we proposed a novel label-free fluorescence method for MTase activity assay by coupling double-stranded DNA (dsDNA)-templated copper nanoparticles (CuNPs) with an endonuclease-assisted signal transduction system. In this strategy, dsDNA molecules were first methylated by DNA adenine methylation (Dam) MTase and then cleaved by the methylation-sensitive restriction endonuclease DpnI. The cleaved DNA fragments could not act as efficient templates for the formation of fluorescent CuNPs and thus no fluorescence signal was produced. Under optimized experimental conditions, the developed strategy exhibited a sensitive fluorescence response to Dam MTase activity. This strategy was also demonstrated to provide an excellent platform to the inhibitor screening for Dam MTase. These results demonstrated the great potential for the practical applications of the proposed strategy for Dam MTase activity assay.

  14. Formulation of an Integrated Community Based Disaster Management for Hydroelectric facilities: The Malaysia Case

    NASA Astrophysics Data System (ADS)

    Hijazzi, Norshamirra; Thiruchelvam, Sivadass; Sabri Muda, Rahsidi; Nasharuddin Mustapha, Kamal; Che Muda, Zakaria; Ghazali, Azrul; Kamal Kadir, Ahmad; Hakimie, Hazlinda; Sahari, Khairul Salleh Mohamed; Hasini, Hasril; Mohd Sidek, Lariyah; Itam, Zarina; Fadhli Mohamad, Mohd; Razad, Azwin Zailti Abdul

    2016-03-01

    Dams, however significant their contributions are to the society, are not immune to failures and diminishing lifespan not unlike other structural elements in our infrastructure. Despite continuing efforts on design, construction, operation, and maintenance of dams to improve the safety of the dams, the possibility of unforeseen events of dam failures is still possible. Seeing that dams are usually integrated into close approximities with the community, dam failures may consequent in tremendous loss of lives and properties. The aims of formulation of Integrated Community Based Disaster Management (ICBDM) is to simulate evacuation modelling and emergency planning in order to minimize loss of life and property damages in the event of a dam-related disaster. To achieve the aim above, five main pillars have been identified for the formulation of ICBDM. A series of well-defined program inclusive of hydrological 2-D modelling, life safety modelling, community based EWS and CBTAP will be conducted. Finally, multiple parties’ engagement is to be carried out in the form of table top exercise to measure the readiness of emergency plans and response capabilities of key players during the state of a crisis.

  15. On the control of riverbed incision induced by run-of-river power plant

    NASA Astrophysics Data System (ADS)

    Bizzi, Simone; Dinh, Quang; Bernardi, Dario; Denaro, Simona; Schippa, Leonardo; Soncini-Sessa, Rodolfo

    2015-07-01

    Water resource management (WRM) through dams or reservoirs is worldwide necessary to support key human-related activities, ranging from hydropower production to water allocation and flood risk mitigation. Designing of reservoir operations aims primarily to fulfill the main purpose (or purposes) for which the structure has been built. However, it is well known that reservoirs strongly influence river geomorphic processes, causing sediment deficits downstream, altering water, and sediment fluxes, leading to riverbed incision and causing infrastructure instability and ecological degradation. We propose a framework that, by combining physically based modeling, surrogate modeling techniques, and multiobjective (MO) optimization, allows to include fluvial geomorphology into MO optimization whose main objectives are the maximization of hydropower revenue and the minimization of riverbed degradation. The case study is a run-of-the-river power plant on the River Po (Italy). A 1-D mobile-bed hydro-morphological model simulated the riverbed evolution over a 10 year horizon for alternatives operation rules of the power plant. The knowledge provided by such a physically based model is integrated into a MO optimization routine via surrogate modeling using the response surface methodology. Hence, this framework overcomes the high computational costs that so far hindered the integration of river geomorphology into WRM. We provided numerical proof that river morphologic processes and hydropower production are indeed in conflict but that the conflict may be mitigated with appropriate control strategies.

  16. Three Dimensional Analysis of the Final Design of Pier Extensions and West Guide Wall to Mitigate Local Scour Risk at the BNSF Railroad Bridge Downstream of the Prado Dam Supplemental Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lottes, S. A.; Sinha, N.; Bojanowski, C.

    This report is a supplement to a previous report [ref] covering optimization of wedge shaped pier extensions to streamline large bluff body piers as a local scour countermeasure for the Burlington Northern and Santa Fe (BNSF) Railroad Bridge over the Santa Ana River downstream of Prado Dam in Riverside County, CA. The optimized design was tested in a 1/30 scale physical model at U.S. Army Engineer Research and Development Center (ERDC) in Vicksburg, MS, and the optimized design was used as the base for the construction design. Constructability issues having to do with both materials and site conditions including accessmore » underneath the BNSF bridge yielded a construction design that required making the pier extensions wider and either moving the western curve of the west guide wall upstream or changing its geometry.« less

  17. Scientific monitoring plan in support of the selected alternative of the Glen Canyon Dam Long-Term Experimental and Management Plan

    USGS Publications Warehouse

    Vanderkooi, Scott P.; Kennedy, Theodore A.; Topping, David J.; Grams, Paul E.; Ward, David L.; Fairley, Helen C.; Bair, Lucas S.; Sankey, Joel B.; Yackulic, Charles B.; Schmidt, John C.

    2017-01-18

    IntroductionThe purpose of this document is to describe a strategy by which monitoring and research data in the natural and social sciences will be collected, analyzed, and provided to the U.S. Department of the Interior (DOI), its bureaus, and to the Glen Canyon Dam Adaptive Management Program (GCDAMP) in support of implementation of the Glen Canyon Dam Long-Term Experimental and Management Plan (LTEMP) (U.S. Department of the Interior, 2016a). The selected alternative identified in the LTEMP Record of Decision (ROD) (U.S. Department of the Interior, 2016b) describes various data collection, analysis, modeling, and interpretation efforts to be conducted by the U.S. Geological Survey’s (USGS) Grand Canyon Monitoring and Research Center (GCMRC), partner agencies, and cooperators that will inform decisions about operations of Glen Canyon Dam and management of downstream resources between 2017 and 2037, the performance period of the LTEMP. General data collection, analysis, modeling, and interpretation activities are described in this science plan, whereas specific monitoring and research activities and detailed study plans are to be described in the GCDAMP’s triennial work plans (TWPs) to be developed by the Bureau of Reclamation and GCMRC with input from partner agencies and cooperators during the LTEMP period, which are to be reviewed and recommended by the GCDAMP and approved by the Secretary of the Interior. The GCDAMP consists of several components, the primary committee being the Adaptive Management Work Group (AMWG). This Federal advisory committee is composed of 25 agencies and stakeholder groups and is chaired by the Secretary of the Interior’s designee. The AMWG makes recommendations to the Secretary of the Interior concerning operations of Glen Canyon Dam and other experimental management actions that are intended to fulfill some obligations of the Grand Canyon Protection Act of 1992. The Technical Work Group (TWG) is a subcommittee of the AMWG and provides technical advice to the AMWG. It is composed of technical and science representatives from the same agencies and stakeholder groups who serve on the AMWG. GCMRC is the primary science provider to the GCDAMP and also coordinates many aspects of the science performed by cooperators and partner agencies. The Science Advisors Program provides independent science reviews and advice at the request of the GCDAMP.The plan proposed here necessarily depends on (1) the protocol for decision-making and the requirements for scientific data reporting described in the LTEMP ROD, (2) the priorities of the GCDAMP as directed by the LTEMP ROD (see Department of the Interior, 2016b, section 6.1), (3) the priorities for monitoring and research in the conservation measures section of the Biological Opinion for the LTEMP (U.S. Department of the Interior, 2016b, LTEMP ROD attachment E), (4) the priorities for resource management and information needs established by Federal and State resource-management agencies within the GCDAMP, (5) scientific understanding about the linkage between the status of those resources and operations of Glen Canyon Dam, and (6) the need to resolve existing scientific uncertainties about the linkage between dam operations and the condition of resources. We note that resource-management prioritization is fundamentally a policy decision charged specifically to DOI for the Colorado River in Glen and Grand Canyons, as outlined most recently in the LTEMP ROD, and is not the responsibility of the GCMRC. However, it is the responsibility of the GCMRC to describe the nature of scientific understanding, the nature of scientific uncertainty, and the risk of making resourcemanagement decisions in the face of existing scientific uncertainty. The goals of science activities in the next 20 years are to inform operational decisions regarding Glen Canyon Dam operations described in the LTEMP ROD, resolve remaining scientific uncertainties, and to monitor resource trends that are affected entirely, or in part, by dam operations.

  18. Screening reservoir systems by considering the efficient trade-offs—informing infrastructure investment decisions on the Blue Nile

    NASA Astrophysics Data System (ADS)

    Geressu, Robel T.; Harou, Julien J.

    2015-12-01

    Multi-reservoir system planners should consider how new dams impact downstream reservoirs and the potential contribution of each component to coordinated management. We propose an optimized multi-criteria screening approach to identify best performing designs, i.e., the selection, size and operating rules of new reservoirs within multi-reservoir systems. Reservoir release operating rules and storage sizes are optimized concurrently for each separate infrastructure design under consideration. Outputs reveal system trade-offs using multi-dimensional scatter plots where each point represents an approximately Pareto-optimal design. The method is applied to proposed Blue Nile River reservoirs in Ethiopia, where trade-offs between total and firm energy output, aggregate storage and downstream irrigation and energy provision for the best performing designs are evaluated. This proof-of concept study shows that recommended Blue Nile system designs would depend on whether monthly firm energy or annual energy is prioritized. 39 TWh/yr of energy potential is available from the proposed Blue Nile reservoirs. The results show that depending on the amount of energy deemed sufficient, the current maximum capacities of the planned reservoirs could be larger than they need to be. The method can also be used to inform which of the proposed reservoir type and their storage sizes would allow for the highest downstream benefits to Sudan in different objectives of upstream operating objectives (i.e., operated to maximize either average annual energy or firm energy). The proposed approach identifies the most promising system designs, reveals how they imply different trade-offs between metrics of system performance, and helps system planners asses the sensitivity of overall performance to the design parameters of component reservoirs.

  19. Development of Probabilistic Flood Inundation Mapping For Flooding Induced by Dam Failure

    NASA Astrophysics Data System (ADS)

    Tsai, C.; Yeh, J. J. J.

    2017-12-01

    A primary function of flood inundation mapping is to forecast flood hazards and assess potential losses. However, uncertainties limit the reliability of inundation hazard assessments. Major sources of uncertainty should be taken into consideration by an optimal flood management strategy. This study focuses on the 20km reach downstream of the Shihmen Reservoir in Taiwan. A dam failure induced flood herein provides the upstream boundary conditions of flood routing. The two major sources of uncertainty that are considered in the hydraulic model and the flood inundation mapping herein are uncertainties in the dam break model and uncertainty of the roughness coefficient. The perturbance moment method is applied to a dam break model and the hydro system model to develop probabilistic flood inundation mapping. Various numbers of uncertain variables can be considered in these models and the variability of outputs can be quantified. The probabilistic flood inundation mapping for dam break induced floods can be developed with consideration of the variability of output using a commonly used HEC-RAS model. Different probabilistic flood inundation mappings are discussed and compared. Probabilistic flood inundation mappings are hoped to provide new physical insights in support of the evaluation of concerning reservoir flooded areas.

  20. 76 FR 65609 - Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-24

    ... Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship Canal... enforcement of regulation. SUMMARY: The Coast Guard will enforce a segment of the Safety Zone; Brandon Road....S. Army Corps of Engineers' dispersal barrier maintenance operations. During the enforcement period...

  1. 77 FR 9265 - Glen Canyon Dam Adaptive Management Work Group

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... (AMP) was implemented as a result of the Record of Decision on the Operation of Glen Canyon Dam Final.... L. 102-575) of 1992. The AMP includes a Federal advisory committee, the AMWG, a technical work group... administrative and resource issues pertaining to the AMP. To view a copy of the agenda and documents related to...

  2. 75 FR 53283 - Yankee Cove Development, LLC; Notice of Declaration of Intention and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-31

    ... reservoir; (2) a proposed eight-foot-high, twenty-two-foot-wide dam; (3) a twenty-inch diameter, 630-foot... water or water power from a government dam; or (4) if applicable, has involved or would involve any... capacity, or have otherwise significantly modified the project's pre-1935 design or operation. l. Locations...

  3. 76 FR 18541 - Wediko Children's Services; Notice of Declaration of Intention and Soliciting Comments, Protests...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-04

    ... dam; (3) a proposed 350-foot-long, 18-to-24-inch-diameter above-ground steel penstock, routed along a... government dam; or (4) if applicable, has involved or would involve any construction subsequent to 1935 that... significantly modified the project's pre-1935 design or operation. l. Locations of the Application: Copies of...

  4. 7. View of turbine pit at an exciter unit showing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. View of turbine pit at an exciter unit showing servo-motor heads (foreground and background at left) with piston rods bolted to the operating ring of the turbine gate (foreground and background at center). View to northeast. - Holter Hydroelectric Facility, Dam & Power House, End of Holter Dam Road, Wolf Creek, Lewis and Clark County, MT

  5. 77 FR 62224 - Notice of Intent To Revise Scope of Draft Environmental Impact Statement for Updating the Water...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-12

    ... Industrial Water Supply From the Buford Dam/Lake Lanier Project AGENCY: Department of the Army, U.S. Army... accommodate municipal and industrial water supply from the Buford Dam/Lake Lanier project. The Corps is... also consider, along with operations for all authorized purposes, an expanded range of water supply...

  6. 76 FR 39435 - Notice of Intent To Prepare a Draft Environmental Impact Statement and Conduct Public Scoping on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-06

    ... Experimental and Management Plan for the Operation of Glen Canyon Dam AGENCY: Bureau of Reclamation and... Interior (Secretary) Ken Salazar announced that the development of a Long-Term Experimental and Management... GCDAMP includes a Federal advisory committee known as the Glen Canyon Dam Adaptive Management Work Group...

  7. 33 CFR 208.22 - Twin Buttes Dam and Reservoir, Middle and South Concho Rivers, Tex.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the reservoir level; number of river outlet works gates in operation with their respective openings... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Twin Buttes Dam and Reservoir... and Reservoir, Middle and South Concho Rivers, Tex. The Bureau of Reclamation, or its designated agent...

  8. 33 CFR 208.22 - Twin Buttes Dam and Reservoir, Middle and South Concho Rivers, Tex.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the reservoir level; number of river outlet works gates in operation with their respective openings... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Twin Buttes Dam and Reservoir... and Reservoir, Middle and South Concho Rivers, Tex. The Bureau of Reclamation, or its designated agent...

  9. 78 FR 76604 - Grand River Dam Authority; Notice of Application Tendered for Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-18

    ... reservoir for the Grand River Dam Authority's Markham Ferry Project No. 2183, for pumped storage operations.... Holway Reservoir (the upper reservoir), with a normal pool elevation between 850 feet and 865 feet National Geodetic Vertical Datum; (2) three rim dikes around the upper reservoir; (3) an 1,800-foot-long...

  10. 78 FR 34255 - Regulated Navigation Area; Vessel Traffic in Vicinity of Marseilles Dam; Illinois River

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-07

    ...-0300 prior to processing through Lock and Dams within the RNA as follows: (i) Northbound vessels must... Navigation Area (RNA) on the Illinois River. This Temporary Final Rule stipulates operational requirements... Mile Marker 240.0 to Mile Marker 271.4. This RNA is necessary to protect the general public, vessels...

  11. Analysis of Causes of Uplift Anomalies in the Čierny Váh Subsoil

    NASA Astrophysics Data System (ADS)

    Bednárová, Emília; Grambličková, Danka; Škvarka, Juraj; Majerčák, Vlastimil; Slávik, Ivan

    2017-12-01

    The pumped storage hydropower plant of Čierny Váh was created by means of damming up the valley of the Čierny Váh River. The dam is 18.5 m high above terrain and 375 m long in the dam’s crest. Total capacity of the reservoir is 5.1 million m3. Complicated geological conditions in the subsoil of dam’s body - fractured dolomite with local occurrence of tectonic breccia and clays, with the occurrence of intense disturbances - called for the construction of the grouting curtain in the dam’s subsoil. Its depth is about 20 in the area of the riverine plain, and about 60 m in the areas of abutments. During foregoing operations of the structure, more than 30 years, local anomalies in the uplift development in the right abutment’s subsoil of the lower reservoir dam were recorded. Their abnormally high values on the downstream side of grouting curtain have become the subject of extensive discussion and a stimulus for its remediation. To ensure reliable operation of the hydraulic structure a comprehensive analysis of the impact of the long-term operation of the reservoir on the dam safety was carried out. This included an examination of the causes of anomalous development of uplifts using FEM numerical modelling. The paper presents obtained results from this analysis.

  12. Air demand estimation in bottom outlets with the particle finite element method. Susqueda Dam case study

    NASA Astrophysics Data System (ADS)

    Salazar, Fernando; San-Mauro, Javier; Celigueta, Miguel Ángel; Oñate, Eugenio

    2017-07-01

    Dam bottom outlets play a vital role in dam operation and safety, as they allow controlling the water surface elevation below the spillway level. For partial openings, water flows under the gate lip at high velocity and drags the air downstream of the gate, which may cause damages due to cavitation and vibration. The convenience of installing air vents in dam bottom outlets is well known by practitioners. The design of this element depends basically on the maximum air flow through the air vent, which in turn is a function of the specific geometry and the boundary conditions. The intrinsic features of this phenomenon makes it hard to analyse either on site or in full scaled experimental facilities. As a consequence, empirical formulas are frequently employed, which offer a conservative estimate of the maximum air flow. In this work, the particle finite element method was used to model the air-water interaction in Susqueda Dam bottom outlet, with different gate openings. Specific enhancements of the formulation were developed to consider air-water interaction. The results were analysed as compared to the conventional design criteria and to information gathered on site during the gate operation tests. This analysis suggests that numerical modelling with the PFEM can be helpful for the design of this kind of hydraulic works.

  13. Survival and migration behavior of juvenile salmonids at McNary Dam, 2004, Final report of research

    USGS Publications Warehouse

    Perry, Russell W.; Braatz, Amy C.; Fielding, Scott D.; Lucchesi, Joel N.; Plumb, John M.; Adams, Noah S.; Rondorf, Dennis W.

    2005-01-01

    During 2004, the USGS Columbia River Research Laboratory conducted a study at McNary Dam using radio telemetry to estimate passage and survival parameters of juvenile salmonids. Our primary objective was to estimate these parameters under ambient environmental and operational conditions, and thus project-wide treatments were not implemented. The primary dam operation consisted of “biop” spill, where spill occurred at night between 1800 and 0600 hours, and no spill occurred between 0600 and 1800 hours for the majority of our study period. During the spring study period, we radio-tagged and released 1,896 yearling Chinook salmon and 1,888 juvenile steelhead. During the summer study period, we radio-tagged and released 1,919 subyearling Chinook salmon. All fish were tagged using gastric techniques to implant transmitters weighing 1.58 g for yearling Chinook salmon, 1.93 g for juvenile steelhead, and 0.96 g for subyearling Chinook salmon. Minimum fish sizes were based on a 6.5% tag:fish weight ratio, and the size of tagged fish represented about 91%, 100%, and 17% of the population, respectively for yearling Chinook salmon, juvenile steelhead, and subyearling Chinook salmon. About 60% of radio-tagged fish were released 10 km upstream of McNary Dam at Hat Rock State Park, Oregon, with the remainder released as control groups 400 m downstream of the dam.

  14. Global sensitivity analysis of water age and temperature for informing salmonid disease management

    NASA Astrophysics Data System (ADS)

    Javaheri, Amir; Babbar-Sebens, Meghna; Alexander, Julie; Bartholomew, Jerri; Hallett, Sascha

    2018-06-01

    Many rivers in the Pacific Northwest region of North America are anthropogenically manipulated via dam operations, leading to system-wide impacts on hydrodynamic conditions and aquatic communities. Understanding how dam operations alter abiotic and biotic variables is important for designing management actions. For example, in the Klamath River, dam outflows could be manipulated to alter water age and temperature to reduce risk of parasite infections in salmon by diluting or altering viability of parasite spores. However, sensitivity of water age and temperature to the riverine conditions such as bathymetry can affect outcomes from dam operations. To examine this issue in detail, we conducted a global sensitivity analysis of water age and temperature to a comprehensive set of hydraulics and meteorological parameters in the Klamath River, California, where management of salmonid disease is a high priority. We applied an analysis technique, which combined Latin-hypercube and one-at-a-time sampling methods, and included simulation runs with the hydrodynamic numerical model of the Lower Klamath. We found that flow rate and bottom roughness were the two most important parameters that influence water age. Water temperature was more sensitive to inflow temperature, air temperature, solar radiation, wind speed, flow rate, and wet bulb temperature respectively. Our results are relevant for managers because they provide a framework for predicting how water within 'high infection risk' sections of the river will respond to dam water (low infection risk) input. Moreover, these data will be useful for prioritizing the use of water age (dilution) versus temperature (spore viability) under certain contexts when considering flow manipulation as a method to reduce risk of infection and disease in Klamath River salmon.

  15. Bayesian Models for Streamflow and River Network Reconstruction using Tree Rings

    NASA Astrophysics Data System (ADS)

    Ravindranath, A.; Devineni, N.

    2016-12-01

    Water systems face non-stationary, dynamically shifting risks due to shifting societal conditions and systematic long-term variations in climate manifesting as quasi-periodic behavior on multi-decadal time scales. Water systems are thus vulnerable to long periods of wet or dry hydroclimatic conditions. Streamflow is a major component of water systems and a primary means by which water is transported to serve ecosystems' and human needs. Thus, our concern is in understanding streamflow variability. Climate variability and impacts on water resources are crucial factors affecting streamflow, and multi-scale variability increases risk to water sustainability and systems. Dam operations are necessary for collecting water brought by streamflow while maintaining downstream ecological health. Rules governing dam operations are based on streamflow records that are woefully short compared to periods of systematic variation present in the climatic factors driving streamflow variability and non-stationarity. We use hierarchical Bayesian regression methods in order to reconstruct paleo-streamflow records for dams within a basin using paleoclimate proxies (e.g. tree rings) to guide the reconstructions. The riverine flow network for the entire basin is subsequently modeled hierarchically using feeder stream and tributary flows. This is a starting point in analyzing streamflow variability and risks to water systems, and developing a scientifically-informed dynamic risk management framework for formulating dam operations and water policies to best hedge such risks. We will apply this work to the Missouri and Delaware River Basins (DRB). Preliminary results of streamflow reconstructions for eight dams in the upper DRB using standard Gaussian regression with regional tree ring chronologies give streamflow records that now span two to two and a half centuries, and modestly smoothed versions of these reconstructed flows indicate physically-justifiable trends in the time series.

  16. Variability in perceived satisfaction of reservoir management objectives

    USGS Publications Warehouse

    Owen, W.J.; Gates, T.K.; Flug, M.

    1997-01-01

    Fuzzy set theory provides a useful model to address imprecision in interpreting linguistically described objectives for reservoir management. Fuzzy membership functions can be used to represent degrees of objective satisfaction for different values of management variables. However, lack of background information, differing experiences and qualifications, and complex interactions of influencing factors can contribute to significant variability among membership functions derived from surveys of multiple experts. In the present study, probabilistic membership functions are used to model variability in experts' perceptions of satisfaction of objectives for hydropower generation, fish habitat, kayaking, rafting, and scenery preservation on the Green River through operations of Flaming Gorge Dam. Degree of variability in experts' perceptions differed among objectives but resulted in substantial uncertainty in estimation of optimal reservoir releases.

  17. Evaluating upstream passage and timing of approach by adult bigheaded carps at a gated dam on the Illinois River

    USGS Publications Warehouse

    Lubejko, Matthew; Whitledge, Greg; Coulter, Alison A.; Brey, Marybeth; Oliver, Devon; Garvey, James E.

    2017-01-01

    Dams are a conservation threat because they function as barriers to native fish movement; however, they may prevent the spread of invasive species. Invasive bigheaded carps (Hypophthalmichthys spp.) threaten the Great Lakes ecosystem and are advancing towards Lake Michigan via the Illinois River. Navigation dams on the Illinois River may deter bigheaded carps' upstream movement. We investigated the permeability of the Starved Rock Lock and Dam (SRLD), the most downstream gated Illinois River dam, to bigheaded carps' migration by examining the timing of individuals approaching and passing through SRLD in relation to gate openness, tailwater elevation, and water temperature. Using acoustic telemetry of (N = ~104 per year) tagged fish, 13 upstream passages of bigheaded carps occurred through SRLD between 2013 and 2016. Eleven passages occurred through the dam gates and 2 through the lock chamber, indicating deterrents (e.g., CO2) placed in SRLD lock chamber may only limit passage of a small proportion of all fish passing through the lock-and-dam structure. Passages were documented only in 2013 and 2015. Most of the dam gate passages occurred during high water when gates were completely out of the water. Timing of bigheaded carps approaching SRLD was positively correlated with rising water temperature and high tailwater elevation, and all fish approached during late March through mid-September. Movement through dams is rare; modifying gate operations to reduce gate openness during late spring and summer could further reduce the permeability of gated dams such as SRLD to bigheaded carps, slowing their upstream advance.

  18. Geomorphology and American dams: The scientific, social, and economic context

    NASA Astrophysics Data System (ADS)

    Graf, William L.

    2005-10-01

    American geomorphologic research related to dams is embedded in a complicated context of science, policy, economics, and culture. Research into the downstream effects of large dams has progressed to the point of theory-building, but generalization and theory-building are from this research because (1) it is highly focused on a few locations, (2) it concerns mostly very large dams rather than a representative sample of sizes, (3) the available record of effects is too short to inform us on long-term changes, (4) the reversibility of changes imposed by dam installation and operation is unknown, and (5) coordinated funding for the needed research is scarce. In the scientific context, present research is embedded in a history of geomorphology in government service, with indistinct boundaries between "basic and applied" research. The federal policy that most strongly influences present geomorphological investigations connected with dams is related to habitat for endangered species, because the biological aspects of ecosystems are directly dependent on the substrate formed by the sediments and landforms that are influenced by dams. The economic context for research includes large amounts of public funds for river restoration, along with substantial private investments in dams; and geomorphology is central to these expensive issues. The cultural context for research is highly contentious and dominated by advocacy procedures that include intense scrutiny of any geomorphologic research related to dams. Advocates are likely to use the products of geomorphological research to make cases for their own positions.

  19. National Dam Safety Program. St. Joe State Park Dam (MO 30277), Mississippi - Kaskaskia - St. Louis Basin, St. Francois County, Missouri. Phase I Inspection Report.

    DTIC Science & Technology

    1980-02-01

    discharge coefficient of C = 3.4 was used. 0 Orifice flow condition when the reservoir water surface sub- merges the inlet opening. * Broad crested weir flow...2.7 was used. The intake tower will operate as a weir , as a weir and an orifice, or as an orifice and a broad crested weir depending upon the...spillway C prior to overtopping the railroad embankment into the original dam pond. Flow over this low point was calculated as flow over a broad crested weir

  20. Archaeological Investigations at Sites 45-OK-250 and 45-OK-4, Chief Joseph Dam Project, Washington.

    DTIC Science & Technology

    1984-01-01

    level behind Chief Joseph Dam. Systematic random sampling using I x I x ’ - 0.1-m collection units in 1 x 1, 1 x 2, or 2 x 2 m cel Is disclosed...ft to the operating pool . level behind Chief Joseph Dam. Systematic random sampling using 1 x 1 x 0.1-i collection units In 1 x 1, 1 x 2, or 2 x 2 m...contingencies under which data were collected , describe data collection and analysis, and organize and summarize data In a torm useful to the widest

  1. National Program for Inspection of Non-Federal Dams. Forest Park Upper Dam (MA 00568), Connecticut River Basin, Springfield, Massachusetts. Phase I Inspection Report.

    DTIC Science & Technology

    1979-09-01

    Suburban Rural,Farm___ ’.iod & and 20% Slope: s;teep 20 tied. 2Q% Slight 60%... ______ Fa.rks Nitial P-onlirg xea. 30 Acres; Ave. Depth 6’ lt priuzqt...dam failure? Yes I No .. Character Downstream Valley: Narrow x Wide _ Developed _ _ Rural 70Z Urban 30 , ’ Park Highway WW Railroad .3 k to life and...Location and Type:. Controls___, ’ype;_________________________ Aut~~c *.~n..l . Gperative Yes-___, No___ : W presen~t ’Ye X ,No . Operative Yes-, No___

  2. National Program for Inspection of Non-Federal Dams. Babson Reservoir Dam (MA 00187), Massachusetts-Rhode Island Coastal Basin, Gloucester, Massachusetts. Phase I Inspection Report.

    DTIC Science & Technology

    1978-11-01

    DIVISION, CORPS OF ENGINEERSWALTHAM, MASS 02154 NTIS GRA&n F NOVEMBER 1978 DTIC TAB Ŕ Justiftcati n r r D stributijon/ Availabilit -" os Dist jSpecial...flashboards removed and can pass the PMF outflow of 1530 cfs (750 csm) with the water level 0.6 ft.Ui below the top of the concrete core wall. Within... water treatment plant and responsible for the day-to-day operation of the dam. He represented the owner during this investigation. His address and

  3. National Dam Safety Program. Little Creek Reservoir Dam (Inventory Number VA 09506), James River Basin, James City County, Commonwealth of Virginia. Phase I Inspection Report.

    DTIC Science & Technology

    1981-02-01

    losses for the PMF were estimated at an initial loss of 1.0 inch and a constant loss rate of 0.05 inches per hour thereafter. 5.5 Reservoir Regulation ...Pertinent dam and reservoir data are shown in Table 1.1, paragraph 1.3.3. Regulation of flow from the reservoir is primarily an automatic function...Normal flows are maintained by the crest of the spillway riser at elevation 60.0 feet M.S.L. Some flow regulation can be exercised by the operation of

  4. National Dam Inspection Program. Lake Hamilton Dam (NDI-ID Number PA-01031), DER-ID Number 64-157), Delaware River Basin, Wayne County, Pennsylvania. Phase I Inspection Report,

    DTIC Science & Technology

    1980-08-01

    5. That the valve on the outlet pipe be maintained and operated at least once each year . 6. That the low area on the right side of the spillway be...EVALUATION OF FEATURES 12 SECTION 6 - STRUCTURAL STABILITY 6.1 EVALUATION OF STRUCTURAL STABILITY 14 SECTION 7 - ASSESSMENT AND RECOMMENDATIONS 7.1 DAM...Classification: High (Refer to Section 3.i.E.) E. Ownership: Ms. Lavanda L. Lyman, Executive Director Rolling Hill Girl Scout Council 733 Route 202

  5. Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival at John Day Dam, 2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weiland, Mark A.; Woodley, Christa M.; Ploskey, Gene R.

    This report presents survival, behavioral, and fish passage results for yearling and subyearling Chinook salmon smolts and juvenile steelhead tagged with JSATS acoustic micro-transmitters as part of a survival study conducted at John Day Dam during 2010. This study was designed to evaluate the passage and survival of yearling and subyearling Chinook salmon and juvenile steelhead to assist managers in identifying dam operations for compliance testing as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the 2008 Columbia Basin Fish Accords. Survival estimates were based on a single-release survival estimate model.

  6. The littoral zone in the Three Gorges Reservoir, China: challenges and opportunities.

    PubMed

    Yuan, Xing-zhong; Zhang, Yue-wei; Liu, Hong; Xiong, Sen; Li, Bo; Deng, Wei

    2013-10-01

    For flood control purpose, the water level of the Three Gorges Reservoir (TGR) varies significantly. The annual reservoir surface elevation amplitude is about 30 m behind the dam. Filling of the reservoir has created about 349 km(2) of newly flooded riparian zone. The average flooding period lasts for more than 6 months, from mid-October to late April. The dam and its associated reservoir provide flood control, power generation, and navigation, but there are also many environmental challenges. The littoral zone is the important part of the TGR, once its eco-health and stability are damaged,which will directly endanger the ecological safety of the whole reservoir area and even the Yangtze River Basin. So, understanding the great ecological opportunities which are hidden in littoral zone of TGR (LZTGR) and putting forward approaches to solve the environmental problems are very important. LZTGR involves a wide field of problems, such as the landslides, potential water pollution, soil erosion, biodiversity loss, land cover changes, and other issues. The Three Gorges dam (TGD) is a major trigger of environmental change in the Yangtze River. The landslides, water quality, soil erosion, loss of biodiversity, dam operation, and challenge for land use are closely interrelated across spatial and temporal scales. Therefore, the ecological and environmental impacts caused by TGD are necessarily complex and uncertain. LZTGR is not only a great environmental challenge but also an ecological opportunity for us. In fact, LZTGR is an important structural unit of TGR ecosystem and has special ecosystem services function. Vegetation growing in LZTGR is therefore a valuable resource due to accumulation of carbon and nutrients. Everyone thinks that the ecological approach to the problem is needed. If properly designed, dike-pond systems, littoral woods systems, and re-created waterfowl habitats will have the capacity to capture nutrients from uplands and obstruct soil erosion. Ecological engineering approaches can therefore reduce environmental impacts of LZTGR and optimize ecological services. In view of the current situation and existing ecological problems of LZTGR, according to function demands such as environmental purification, biodiversity conservation, and vegetation carbon sink enhancement, we should explore the eco-friendly utilization mode of resources in LZTGR. Ecological engineering approaches might minimize the impacts or optimize the ecological services. Natural regeneration and ecological restoration in LZTGR are valuable for soil erosion decrease, pollutant purification, biodiversity conservation, carbon sink increase, and ecosystem health maintenance in TGR.

  7. Valuing hydrological alteration in multi-objective water resources management

    NASA Astrophysics Data System (ADS)

    Bizzi, Simone; Pianosi, Francesca; Soncini-Sessa, Rodolfo

    2012-11-01

    SummaryThe management of water through the impoundment of rivers by dams and reservoirs is necessary to support key human activities such as hydropower production, agriculture and flood risk mitigation. Advances in multi-objective optimization techniques and ever growing computing power make it possible to design reservoir operating policies that represent Pareto-optimal tradeoffs between multiple interests. On the one hand, such optimization methods can enhance performances of commonly targeted objectives (such as hydropower production or water supply), on the other hand they risk strongly penalizing all the interests not directly (i.e. mathematically) included in the optimization algorithm. The alteration of the downstream hydrological regime is a well established cause of ecological degradation and its evaluation and rehabilitation is commonly required by recent legislation (as the Water Framework Directive in Europe). However, it is rarely embedded in reservoir optimization routines and, even when explicitly considered, the criteria adopted for its evaluation are doubted and not commonly trusted, undermining the possibility of real implementation of environmentally friendly policies. The main challenges in defining and assessing hydrological alterations are: how to define a reference state (referencing); how to define criteria upon which to build mathematical indicators of alteration (measuring); and finally how to aggregate the indicators in a single evaluation index (valuing) that can serve as objective function in the optimization problem. This paper aims to address these issues by: (i) discussing the benefits and constrains of different approaches to referencing, measuring and valuing hydrological alteration; (ii) testing two alternative indices of hydrological alteration, one based on the established framework of Indicators of Hydrological Alteration (Richter et al., 1996), and one satisfying the mathematical properties required by widely used optimization methods based on dynamic programming; (iii) demonstrating and discussing these indices by application River Ticino, in Italy; (iv) providing a framework to effectively include hydrological alteration within reservoir operation optimization.

  8. Adult chinook salmon passage at Little Goose Dam in relation to spill operations

    USGS Publications Warehouse

    Jepson, M.A.; Caudill , C.C.; Clabough, T.S.; Peery, C.A.; Beeman, J.W.; Fielding, S.

    2009-01-01

    Spill patterns at Little Goose Dam in 2007 were modified in anticipation of a spillway weir installation intended to improve downstream passage of juvenile salmonids. However, in spill pattern was associated with reduced daily counts of adult salmon passing the dam. Consequently, the behaviors and upstream passage times of radio-tagged adult spring–summer Chinook salmon were evaluated in response to three spillway discharge patterns at Little Goose Dam during 2008. Simultaneously, tailrace conditions were characterized by monitoring the downstream paths of GPS-equipped drogues. Two of the spill treatments (i.e., Bulk and Alternate) were variations of patterns thought to mimic those produced if a spillway weir was installed. The third treatment (Uniform) was characterized by spilling similar volumes of water through most spillbays.

  9. Hydroacoustic Evaluation of Overwintering Summer Steelhead Fallback and Kelt Passage at The Dalles Dam, 2009-2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Khan, Fenton; Johnson, Gary E.; Weiland, Mark A.

    2010-07-31

    This report presents the results of an evaluation of overwintering summer steelhead (Oncorhynchus mykiss) fallback and early out-migrating steelhead kelts downstream passage at The Dalles Dam (TDA) sluiceway and turbines during fall/winter 2009 through early spring 2010. The study was conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers, Portland District (USACE). The goal of this study was to characterize adult steelhead spatial and temporal distributions and passage rates at the sluiceway and turbines for fisheries managers and engineers to use in decision-making relative to sluiceway operations. The study was from November 1, 2009more » to April 10, 2010. The study was divided into three study periods: Period 1, November 1 - December 15, 2009 for a fall/winter sluiceway and turbine study; Period 2, December 16, 2009 - February 28, 2010 for a turbine only study; Period 3, March 1 - April 10, 2010 for a spring sluiceway and turbine study. Sluiceway operations were scheduled to begin on March 1 for this study; however, because of an oil spill cleanup near the sluice outfall, sluiceway operations were delayed until March 8, 2010, therefore the spring study period did not commence until March 8. The study objectives were to (1) estimate the number and distribution of overwintering summer steelhead fallbacks and kelt-sized acoustic targets passing into the sluiceway and turbines at TDA between November 1 and December 15, 2009 and March 1 and April 10, 2010, and (2) estimate the numbers and distribution of adult steelhead and kelt-sized targets passing into turbine units between December 16, 2009 and February 28, 2010. We obtained fish passage data using fixed-location hydroacoustics. For Period 1, overwintering summer steelhead fallback occurred throughout the 45-day study period. A total of 879 {+-} 165 (95% CI) steelhead targets passed through the powerhouse and sluiceway during November 1 to December 15, 2009. Ninety two percent of these fish passed through the sluiceway. Run timing peaked in early December, but fish continued to pass the dam until the end of the study. Horizontal distribution data indicated that Sluice 1 is the preferred route for these fish during fallback through the dam. Diel distribution for steelhead was variable with no apparent distinct patterns. For Period 2, adult steelhead passage occurred on January 14 and 31 and February 2, 22, and 24. A total of 62 {+-} 40 (95% CI) steelhead targets passed through the powerhouse intakes during December 16, 2009 to March 7, 2010. Horizontal distribution data indicated turbine unit 18 passed the majority of fish. Fish passage occurred during morning periods. Passage did not occur during afternoon or nighttime. For Period 3, the early spring study period, overwintering summer steelhead and early out-migrating steelhead kelt downstream passage occurred throughout the 34-day study period. A total of 1,985 {+-} 234 (95% CI) kelt-size targets were estimated to have passed through the powerhouse sluiceway. Ninety-nine percent of these fish passed through the sluiceway. Run timing peaked in late March and again in early April. Horizontal distribution indicated that Sluice 1 is the preferred route for these adult salmonids as they migrate downstream through the dam. Diel distribution for steelhead was variable with no apparent distinct patterns. The results of this study strongly suggest that operating the TDA sluiceway for steelhead passage (fallbacks and kelts) during the late fall, winter, and early spring months will provide an optimal, non-turbine route for these fishes to pass the dam.« less

  10. Using large-scale flow experiments to rehabilitate Colorado River ecosystem function in Grand Canyon: Basis for an adaptive climate-resilient strategy: Chapter 17

    USGS Publications Warehouse

    Melis, Theodore S.; Pine, William E.; Korman, Josh; Yard, Michael D.; Jain, Shaleen; Pulwarty, Roger S.; Miller, Kathleen; Hamlet, Alan F.; Kenney, Douglas S.; Redmond, Kelly T.

    2016-01-01

    Adaptive management of Glen Canyon Dam is improving downstream resources of the Colorado River in Glen Canyon National Recreation Area and Grand Canyon National Park. The Glen Canyon Dam Adaptive Management Program (AMP), a federal advisory committee of 25 members with diverse special interests tasked to advise the U.S. Department of the Interior), was established in 1997 in response to the 1992 Grand Canyon Protection Act. Adaptive management assumes that ecosystem responses to management policies are inherently complex and unpredictable, but that understanding and management can be improved through monitoring. Best known for its high-flow experiments intended to benefit physical and biological resources by simulating one aspect of pre-dam conditions—floods, the AMP promotes collaboration among tribal, recreation, hydropower, environmental, water and other natural resource management interests. Monitoring has shown that high flow experiments move limited new tributary sand inputs below the dam from the bottom of the Colorado River to shorelines; rebuilding eroded sandbars that support camping areas and other natural and cultural resources. Spring-timed high flows have also been shown to stimulate aquatic productivity by disturbing the river bed below the dam in Glen Canyon. Understanding about how nonnative tailwater rainbow trout (Oncorhynchus mykiss), and downstream endangered humpback chub (Gila cypha) respond to dam operations has also increased, but this learning has mostly posed “surprise” adaptation opportunities to managers. Since reoperation of the dam to Modified Low Fluctuating Flows in 1996, rainbow trout now benefit from more stable daily flows and high spring releases, but possibly at a risk to humpback chub and other native fishes downstream. In contrast, humpback chub have so far proven robust to all flows, and native fish have increased under the combination of warmer river temperatures associated with reduced storage in Lake Powell, and a system-wide reduction in trout from 2000-06, possibly due to several years of natural reproduction under limited food supply. Uncertainties about dam operations and ecosystem responses remain, including how native and nonnative fish will interact and respond to possible increased river temperatures under drier basin conditions. Ongoing assessment of operating policies by the AMP’s diverse stakeholders represents a major commitment to the river’s valued resources, while surprise learning opportunities can also help identify a resilient climate-change strategy for co-managing nonnative and endangered native fish, sandbar habitats and other river resources in a region with already complex and ever-increasing water demands.

  11. 75 FR 63166 - Howard Rosenfeld; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-14

    ... dam; (3) a proposed 18-inch-diameter, 535-foot-long PVC penstock; (4) an existing 22-foot-long, 22... water or water power from a government dam; or (4) if applicable, has involved or would involve any... capacity, or have otherwise significantly modified the project's pre-1935 design or operation. l. Locations...

  12. 76 FR 70440 - Haiwee Ridge Pumped Storage Project; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-14

    ... South Haiwee reservoir, near the town of Olancha, Inyo County, California. The project would affect... (Alternatives A and B) would consist of the existing South Haiwee dam. The dam has operations limited due to... the water level in the reservoir is limited to a maximum elevation of 3,742 feet msl. The applicant is...

  13. 33 CFR 207.310 - Mississippi River at Keokuk, Iowa; operation of power dam by Mississippi River Power Co.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the dam until further orders: (b) Excepting as specially provided in this section the normal flow of... when the natural flow of the Mississippi River is falling or when such natural flow is less than..., such permit to state the period which such ponding may cover and the maximum variation in stage below...

  14. Flash flood prediction in large dams using neural networks

    NASA Astrophysics Data System (ADS)

    Múnera Estrada, J. C.; García Bartual, R.

    2009-04-01

    A flow forecasting methodology is presented as a support tool for flood management in large dams. The practical and efficient use of hydrological real-time measurements is necessary to operate early warning systems for flood disasters prevention, either in natural catchments or in those regulated with reservoirs. In this latter case, the optimal dam operation during flood scenarios should reduce the downstream risks, and at the same time achieve a compromise between different goals: structural security, minimize predictions uncertainty and water resources system management objectives. Downstream constraints depend basically on the geomorphology of the valley, the critical flow thresholds for flooding, the land use and vulnerability associated with human settlements and their economic activities. A dam operation during a flood event thus requires appropriate strategies depending on the flood magnitude and the initial freeboard at the reservoir. The most important difficulty arises from the inherently stochastic character of peak rainfall intensities, their strong spatial and temporal variability, and the highly nonlinear response of semiarid catchments resulting from initial soil moisture condition and the dominant flow mechanisms. The practical integration of a flow prediction model in a real-time system should include combined techniques of pre-processing, data verification and completion, assimilation of information and implementation of real time filters depending on the system characteristics. This work explores the behaviour of real-time flood forecast algorithms based on artificial neural networks (ANN) techniques, in the River Meca catchment (Huelva, Spain), regulated by El Sancho dam. The dam is equipped with three Taintor gates of 12x6 meters. The hydrological data network includes five high-resolution automatic pluviometers (dt=10 min) and three high precision water level sensors in the reservoir. A cross correlation analysis between precipitation data and inflows was previously performed for several historical events. Optimal time lags were found to be in the range of 2 to 6 hours, depending on the event. On the other hand, the flow autocorrelation analysis shows an average correlation of 0.50 for a lag=5 hours, and 0.40 for a lag= 6 hours, suggesting a reasonable prediction horizon. The proposed forecasting methodology includes the on line time series historical reconstruction of the average rainfall in the catchment by the Thiessen polygons method, and the inflow estimation through the mass balance in the reservoir, while output flows derive from the hydraulics of the gates. The future values of inflows are predicted with an ANN model. This technique was chosen because of the general good ability shown by ANN in a number of publications, and due to its very high computational efficiency. Several ANN models architectures have been evaluated and compared. In all cases, input variables are average hourly flows and rainfalls in the catchments with different time delays, according to the forecasting horizon. Also the immediate future precipitation from an outside weather model is processed. The prediction horizon has been set to 3 hours, although results show that it could be extended a few extra hours if the external precipitation forecasts were reliable enough. All the ANN models analyzed have a very simple architecture based on the conventional Three Layer Feed Forward Perceptron, with a variable number of hidden nodes and one single node in the output layer producing the next hour flow value. For the following time steps, a serial-propagated neural networks structure scheme is used, following the strategy suggested by F. Chang J. et al (2007). The ANN models have been compared using the root mean square error (RMSE) and the Nash-Sutcliffe efficiency (NSE) statistical indices. The best model among all was chosen and implemented. Quality of predictions has been found to be strongly affected by reliability of rainfall predictions, in particular when it is overestimated, and not so much when it is underestimated. To reduce such sensitivity, a new model was proposed eliminating completely predicted rainfalls in the input set. Although results are slightly poorer, NSE index reveals a satisfactory performance in the validation set (0.80). The robustness and simplicity of ANN schemes makes them particularly appropriate in real-time systems, as they can easily be integrated and programmed, handling well the presence of possible errors and uncertainties in data. On the other hand, they are computationally very efficient, and over all, they are easily updated without changing the general conception and operation of the real-time decision making support tool.

  15. Modelling Tradeoffs Evolution in Multipurpose Water Systems Operation in Response to Extreme Events

    NASA Astrophysics Data System (ADS)

    Mason, E.; Gazzotti, P.; Amigoni, F.; Giuliani, M.; Castelletti, A.

    2015-12-01

    Multipurpose water resource systems are usually operated on a tradeoff of the operating objectives, which - under steady state climatic and socio-economic boundary conditions - is supposed to ensure a fair and/or efficient balance among the conflicting interests. Extreme variability in the system's drivers might affect operators' risk aversion and force a change in the tradeoff. Properly accounting for these shifts is key to any rigorous retrospective assessment of operators' behavior and the associated system's performance. In this study, we explore how the selection of different optimal tradeoffs among the operating objectives is linked to the variations of the boundary conditions, such as, for example, drifting rainfall season or remarkable changes in crop and energy prices. We argue that tradeoff selection is driven by recent, extreme variations in system performance: underperforming on one of the operating objective target value should push the tradeoff toward the disadvantaged objective. To test this assumption, we developed a rational procedure to simulate the operators' tradeoff selection process. We map the selection onto a multi lateral negotiation process, where different multiple, virtual agents optimize different operating objectives. The agents periodically negotiate a compromise on the operating policy. The agent's rigidity in each negotiation round is determined by the recent system performances according to the specific objective it represents. The negotiation follows a set-based egocentric monotonic concession protocol: at each negotiation step an agent incrementally adds some options to the set of its acceptable compromises and (possibly) accepts lower and lower satisfying policies until an agreement is achieved. We apply this reiterated negotiation framework on the regulated Lake Como, Italy, simulating the lake dam operation and its recurrent updates over the last 50 years. The operation aims to balance shoreline flood prevention and irrigation deficit control in the downstream irrigated areas. The results of our simulated negotiations are able to accurately capture the operator's risk aversion changes as driven by extreme wet and dry situations, and to well reproduce the observational release data.

  16. Feasibility of groundwater recharge dam projects in arid environments

    NASA Astrophysics Data System (ADS)

    Jaafar, H. H.

    2014-05-01

    A new method for determining feasibility and prioritizing investments for agricultural and domestic recharge dams in arid regions is developed and presented. The method is based on identifying the factors affecting the decision making process and evaluating these factors, followed by determining the indices in a GIS-aided environment. Evaluated parameters include results from field surveys and site visits, land cover and soils data, precipitation data, runoff data and modeling, number of beneficiaries, domestic irrigation demand, reservoir objectives, demography, reservoirs yield and reliability, dam structures, construction costs, and operation and maintenance costs. Results of a case study on more than eighty proposed dams indicate that assessment of reliability, annualized cost/demand satisfied and yield is crucial prior to investment decision making in arid areas. Irrigation demand is the major influencing parameter on yield and reliability of recharge dams, even when only 3 months of the demand were included. Reliability of the proposed reservoirs as related to their standardized size and net inflow was found to increase with increasing yield. High priority dams were less than 4% of the total, and less priority dams amounted to 23%, with the remaining found to be not feasible. The results of this methodology and its application has proved effective in guiding stakeholders for defining most favorable sites for preliminary and detailed design studies and commissioning.

  17. Effects of Climate Change and Deforestation on the Amazon's Hydrological Cycle Will Require Interventions to Hydropower Planning in Brazil

    NASA Astrophysics Data System (ADS)

    Arias, M. E.; Farinosi, F.; Lee, E.; Livino, A.; Moorcroft, P. R.

    2016-12-01

    Brazil is the 2nd largest hydropower producer in the world, and this energy source will continue to be a priority in the country for the foreseeable decades. Yet, climate change is expected to alter the country's hydrological regime, in particular in the Amazon where most new hydropower development is occurring. In order to better assess the potential of hydropower projects in decades to come, it is important to evaluate how future hydrological regimes will affect their performance and suitability. This study quantifies the impacts of climate change and land use conversion on hydropower generation, and identifies mechanisms that could help energy planners to account for future changes. Using the largest network of dams in Brazil's national portfolio within a single watershed, the Tapaj's River, this study connects global and regional future environmental projections to daily river flows and operations of 37 dams with an overall potential capacity of 29.4 GW. We found that climate change could decrease hydropower potential by 477-665 MW (-6 to -8% from historical conditions) during the dry season, a critical loss since dams are expected to operate at only one third of capacity during this perioddue to the limited reservoir volume of most projects in the Amazon lowlands. Furthermore, deforestation is expected to increase the inter-annual variability in hydropower potential from 2,798 for baseline conditions to 3,764-3,899 (+967-1102) MW under future scenarios for the 2040s. Consideration of future hydrological conditions on individual dams showed that the magnitude and uncertainty of losses could be greater than 30 MW -equivalent to the total potential of some dams in the inventory- in 11 of the projects studied. Future hydrological conditions could also delay the period when maximum daily generation occurs by 22-29 days, which could have important implications to energy planning in Brazil because these run-of-river dams would no longer be able to meet the country's seasonal peak demand. This information on future changes to individual dams' performance could feed directly into the project selection process in order to adapt designs and operations to ensure the greatest benefits and least impacts from hydropower in the long term.

  18. Status and Trends of Resources Below Glen Canyon Dam Update - 2009

    USGS Publications Warehouse

    Hamill, John F.

    2009-01-01

    The protection of resources found in Glen Canyon National Recreation Area and Grand Canyon National Park, Arizona, emerged as a significant public concern in the decades following the completion of Glen Canyon Dam in 1963. The dam, which lies about 15 miles upstream from the park, altered the Colorado River's flow, temperature, and sediment-carrying capacity, resulting over time in beach erosion, expansion of nonnative species, and losses of native fish. During the 1990s, in response to public concern, Congress and the Department of the Interior embarked on an ongoing effort to reduce and address the effects of dam operations on downstream resources. In 2005, the U.S. Geological Survey produced a comprehensive report entitled 'The State of the Colorado River Ecosystem in Grand Canyon', which documented the condition and trends of resources downstream of Glen Canyon Dam from 1991 to 2004. This fact sheet updates the 2005 report to extend its findings to include data published through April 2009 for key resources.

  19. Small Displacement Coupled Analysis of Concrete Gravity Dam Foundations: Static and Dynamic Conditions

    NASA Astrophysics Data System (ADS)

    Farinha, Maria Luísa Braga; Azevedo, Nuno Monteiro; Candeias, Mariline

    2017-02-01

    The explicit formulation of a small displacement model for the coupled hydro-mechanical analysis of concrete gravity dam foundations based on joint finite elements is presented. The proposed coupled model requires a thorough pre-processing stage in order to ensure that the interaction between the various blocks which represent both the rock mass foundation and the dam is always edge to edge. The mechanical part of the model, though limited to small displacements, has the advantage of allowing an accurate representation of the stress distribution along the interfaces, such as rock mass joints. The hydraulic part and the mechanical part of the model are fully compatible. The coupled model is validated using a real case of a dam in operation, by comparison of the results with those obtained with a large displacement discrete model. It is shown that it is possible to assess the sliding stability of concrete gravity dams using small displacement models under both static and dynamic conditions.

  20. Performance of a surface bypass structure to enhance juvenile steelhead passage and survival at Lower Granite Dam, Washington

    USGS Publications Warehouse

    Adams, Noah S.; Plumb, John M.; Perry, Russell W.; Rondorf, Dennis W.

    2014-01-01

    An integral part of efforts to recover stocks of Pacific salmon Oncorhynchus spp. and steelhead O. mykiss in Pacific Northwest rivers is to increase passage efficacy and survival of juveniles past hydroelectric dams. As part of this effort, we evaluated the efficacy of a prototype surface bypass structure, the removable spillway weir (RSW), installed in a spillbay at Lower Granite Dam, Washington, on the Snake River during 2002, 2003, 2005, and 2006. Radio-tagged juvenile steelhead were released upstream from the dam and their route of passage through the turbines, juvenile bypass, spillway, or RSW was recorded. The RSW was operated in an on-or-off condition and passed 3–13% of the total discharge at the dam when it was on. Poisson rate models were fit to the passage counts of hatchery- and natural-origin juvenile steelhead to predict the probability of fish passing the dam. Main-effect predictor variables were RSW operation, diel period, day of the year, proportion of flow passed by the spillway, and total discharge at the dam. The combined fish passage through the RSW and spillway was 55–85% during the day and 37–61% during the night. The proportion of steelhead passing through nonturbine routes was <88% when the RSW was off during the day and increased to >95% when the RSW was on during the day. The ratio of the proportion of steelhead passed to the proportion of water passing the RSW was from 6.3:1 to 10.0:1 during the day and from 2.7:1 to 5.2:1 during the night. Steelhead passing through the RSW exited the tailrace about 15 min faster than fish passing through the spillway. Mark–recapture single-release survival estimates for steelhead passing the RSW ranged from 0.95 to 1.00. The RSW appeared to be an effective bypass structure compared with other routes of fish passage at the dam.

  1. Assessing dam development, land use conversion, and climate change pressures on tributary river flows and water quality of the Mekong's Tonle Sap basin.

    NASA Astrophysics Data System (ADS)

    Cochrane, T. A.; Arias, M. E.; Oeurng, C.; Arnaiz, M.; Piman, T.

    2016-12-01

    The Tonle Sap Lake is Southeast Asia's most productive freshwater fishery, but the productivity of this valuable ecosystem is under threat from extensive development in the lower Mekong. With dams potentially blocking all major tributaries along the lower Mekong River, the role of local Tonle Sap basin tributaries for maintaining environmental flows, sediment loads, and fish recruitment is becoming increasingly critical. Development within the Tonle Sap basin, however, is not stagnant. Developers are proposing extensive dam development in key Tonle Sap tributaries (see Figure). Some dams will provide hydroelectricity and others will provide opportunities for large-scale irrigation resulting in agro-industrial expansion. There is thus an immediate need to assess the current situation and understand future effects of dam development and land use conversion under climate change on local riverine ecosystems. A combination of remote sensing, field visits, and hydro-meteorological data analyses enabled an assessment of water infrastructure and agricultural development in the basin. The application of SWAT for modelling flows and water quality combined with HEC-RESSIM for reservoir operations enabled for a holistic modelling approach. Initial results show that dams and land use change dominate flow and water quality responses, when compared to climate change. Large ongoing dam and irrigation development in the Pursat and Battambang subbasins will critically alter the natural river flows to the Tonle Sap Lake. Some of the observed dams did not have provisions for sediment flushing, clearing of flooded areas, fish passages, or other environmental protection measures. Poor planning and operation of this infrastructure could have dire consequences on the fragile riverine ecosystem of Tonle Sap tributaries, resulting in fish migration barriers, losses in aquatic habitats, and ecological degradation. The seemingly chaotic development in the Tonle Sap basin induces a great level of complexity in the prediction of future change in flows, sediment, and nutrients to the Tonle Sap, which needs to be overcome with improved data gathering through tools such as remote sensing. Timely interventions to the current development is needed in order to alleviate future environmental pressures.

  2. GIS-based approach for optimal siting and sizing of renewables considering techno-environmental constraints and the stochastic nature of meteorological inputs

    NASA Astrophysics Data System (ADS)

    Daskalou, Olympia; Karanastasi, Maria; Markonis, Yannis; Dimitriadis, Panayiotis; Koukouvinos, Antonis; Efstratiadis, Andreas; Koutsoyiannis, Demetris

    2016-04-01

    Following the legislative EU targets and taking advantage of its high renewable energy potential, Greece can obtain significant benefits from developing its water, solar and wind energy resources. In this context we present a GIS-based methodology for the optimal sizing and siting of solar and wind energy systems at the regional scale, which is tested in the Prefecture of Thessaly. First, we assess the wind and solar potential, taking into account the stochastic nature of the associated meteorological processes (i.e. wind speed and solar radiation, respectively), which is essential component for both planning (i.e., type selection and sizing of photovoltaic panels and wind turbines) and management purposes (i.e., real-time operation of the system). For the optimal siting, we assess the efficiency and economic performance of the energy system, also accounting for a number of constraints, associated with topographic limitations (e.g., terrain slope, proximity to road and electricity grid network, etc.), the environmental legislation and other land use constraints. Based on this analysis, we investigate favorable alternatives using technical, environmental as well as financial criteria. The final outcome is GIS maps that depict the available energy potential and the optimal layout for photovoltaic panels and wind turbines over the study area. We also consider a hypothetical scenario of future development of the study area, in which we assume the combined operation of the above renewables with major hydroelectric dams and pumped-storage facilities, thus providing a unique hybrid renewable system, extended at the regional scale.

  3. Determining the effects of dams on subdaily variation in river flows at a whole-basin scale

    USGS Publications Warehouse

    Zimmerman, J.K.H.; Letcher, B.H.; Nislow, K.H.; Lutz, K.A.; Magilligan, F.J.

    2010-01-01

    River regulation can alter the frequency and magnitude of subdaily flow variations causing major impacts on ecological structure and function. We developed an approach to quantify subdaily flow variation for multiple sites across a large watershed to assess the potential impacts of different dam operations (flood control, run-of-river hydropower and peaking hydropower) on natural communities. We used hourly flow data over a 9-year period from 30 stream gages throughout the Connecticut River basin to calculate four metrics of subdaily flow variation and to compare sites downstream of dams with unregulated sites. Our objectives were to (1) determine the temporal scale of data needed to characterize subdaily variability; (2) compare the frequency of days with high subdaily flow variation downstream of dams and unregulated sites; (3) analyse the magnitude of subdaily variation at all sites and (4) identify individual sites that had subdaily variation significantly higher than unregulated locations. We found that estimates of flow variability based on daily mean flow data were not sufficient to characterize subdaily flow patterns. Alteration of subdaily flows was evident in the number of days natural ranges of variability were exceeded, rather than in the magnitude of subdaily variation, suggesting that all rivers may exhibit highly variable subdaily flows, but altered rivers exhibit this variability more frequently. Peaking hydropower facilities had the most highly altered subdaily flows; however, we observed significantly altered ranges of subdaily variability downstream of some flood-control and run-of-river hydropower dams. Our analysis can be used to identify situations where dam operating procedures could be modified to reduce the level of hydrologic alteration. ?? 2009 John Wiley & Sons, Ltd.

  4. Can water-level management reduce malaria mosquito abundance around large dams in sub-Saharan Africa?

    PubMed Central

    Wilson, G. Glenn; Ryder, Darren; Tekie, Habte; Petros, Beyene

    2018-01-01

    Background Water level management has been suggested as a potential tool to reduce malaria around large reservoirs. However, no field-based test has been conducted to assess the effect of water level management on mosquito larval abundance in African settings. The objective of the present study is to evaluate the effects of water level drawdown rates on mosquito larval abundance. Methods Twelve experimental dams were constructed on the foreshore of the Koka Dam in Ethiopia. These were grouped into four daily water drawdown treatments, each with three replicates: no water-level drawdown (Group 1; Control), 10 mm.d-1 (Group 2), 15 mm.d-1 (Group 3) and 20 mm.d-1 (Group 4). Larval sampling was conducted weekly for a period of 6 weeks each in the main malaria transmission season (October to November 2013) and subsequent dry season (February to March 2014). Larval densities were compared among treatments over time using repeated measures Analysis of Variance (ANOVA). Results A total of 284 Anopheles mosquito larvae were collected from the experimental dams during the study period. Most (63.4%; n = 180) were collected during the main malaria transmission season while the remaining (36.6%; n = 104) were collected during the dry season. Larvae comprised four Anopheles species, dominated by Anopheles arabiensis (48.1% of total larval samples; n = 136) and An. pharoensis (33.2%; n = 94). Mean larval density was highest in control treatment dams with stable water levels throughout the study, and decreased significantly (P < 0.05) with increasing water drawdown rates in both seasons. During the main transmission season, anopheline larval density was generally lower by 30%, 70% and 84% in Groups 2, Group 3 and Group 4, respectively, compared with the control dams (Group 1). In the dry season, larval density was reduced by 45%, 70% and 84% in Groups 2, Group 3 and Group 4, respectively, when compared to the control dams. Conclusion Increased water drawdown rates were associated with lower mosquito larval abundance. Water level management could thus serve as a potential control measure for malaria vectors around reservoirs by regulating the persistence of shallow shoreline breeding habitats. Dam operators and water resource managers should consider incorporating water level management as a malaria control mechanism into routine dam operations to manage the risk of malaria transmission to human populations around reservoirs. PMID:29672560

  5. Modeling Limited Foresight in Water Management Systems

    NASA Astrophysics Data System (ADS)

    Howitt, R.

    2005-12-01

    The inability to forecast future water supplies means that their management inevitably occurs under situations of limited foresight. Three modeling problems arise, first what type of objective function is a manager with limited foresight optimizing? Second how can we measure these objectives? Third can objective functions that incorporate uncertainty be integrated within the structure of optimizing water management models? The paper reviews the concepts of relative risk aversion and intertemporal substitution that underlie stochastic dynamic preference functions. Some initial results from the estimation of such functions for four different dam operations in northern California are presented and discussed. It appears that the path of previous water decisions and states influences the decision-makers willingness to trade off water supplies between periods. A compromise modeling approach that incorporates carry-over value functions under limited foresight within a broader net work optimal water management model is developed. The approach uses annual carry-over value functions derived from small dimension stochastic dynamic programs embedded within a larger dimension water allocation network. The disaggregation of the carry-over value functions to the broader network is extended using the space rule concept. Initial results suggest that the solution of such annual nonlinear network optimizations is comparable to, or faster than, the solution of linear network problems over long time series.

  6. 8. VIEW OF INTERIOR OF OPERATING HOUSE. 'WORTHINGTON PUMP AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. VIEW OF INTERIOR OF OPERATING HOUSE. 'WORTHINGTON PUMP AND MACHINE COMPANY' PUMP AND MOTOR TO OPERATE GAMES - San Carlos Irrigation Project, Ashurst-Hayden Dam, Gila River, T4S R11E S7, Coolidge, Pinal County, AZ

  7. 78 FR 47695 - Sam Rayburn Dam Power Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-06

    ... replacements in the hydroelectric generating facilities and small increases to annual operations and... K. McDonald, Vice President for Corporate Operations/Chief Operating Officer, Southwestern Power... Code of Federal Regulations (18 CFR 300). Southwestern markets power from 24 multi-purpose reservoir...

  8. Elevated streamflows increase dam passage by juvenile coho salmon during winter: Implications of climate change in the Pacific Northwest

    USGS Publications Warehouse

    Kock, Tobias J.; Liedtke, Theresa L.; Rondorf, Dennis W.; Serl, John D.; Kohn, Mike; Bumbaco, Karin A.

    2012-01-01

    A 4-year evaluation was conducted to determine the proportion of juvenile coho salmon Oncorhynchus kisutch passing Cowlitz Falls Dam, on the Cowlitz River, Washington, during winter. River and reservoir populations of coho salmon parr were monitored using radiotelemetry to determine if streamflow increases resulted in increased downstream movement and dam passage. This was of interest because fish that pass downstream of Cowlitz Falls Dam become landlocked in Riffe Lake and are lost to the anadromous population. Higher proportions of reservoir-released fish (0.391-0.480) passed Cowlitz Falls Dam than did river-released fish (0.037-0.119). Event-time analyses demonstrated that streamflow increases were important predictors of dam passage rates during the study. The estimated effect of increasing streamflows on the risk of dam passage varied annually and ranged from 9% to 75% for every 28.3 m3/s increase in streamflow. These results have current management implications because they demonstrate the significance of dam passage by juvenile coho salmon during winter months when juvenile fish collection facilities are typically not operating. The results also have future management implications because climate change predictions suggest that peak streamflow timing for many watersheds in the Pacific Northwest will shift from late spring and early summer to winter. Increased occurrence of intense winter flood events is also expected. Our results demonstrate that juvenile coho salmon respond readily to streamflow increases and initiate downstream movements during winter months, which could result in increased passage at dams during these periods if climate change predictions are realized in the coming decades.

  9. 77 FR 50493 - Sam Rayburn Dam Project Power Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-21

    ...-purpose reservoir projects with hydroelectric power facilities constructed and operated by the U.S. Army... Corporate Operations, Southwestern Power Administration, One West Third, Tulsa, OK 74103, (918) 595-6680 or...

  10. 77 FR 41778 - City of Sandpoint; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-16

    .... The proposed project will consist of a small 30-foot-high rock dam, a small reservoir, an 18- [[Page... United States; (3) would utilize surplus water or water power from a government dam; or (4) if applicable... pre-1935 design or operation. l. Locations of the Application: Copies of this filing are on file with...

  11. 77 FR 2718 - Don Grant; Notice of Petition for Declaratory Order and Soliciting Comments, Protests, and/or...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-19

    ... 158-foot-long, 8- foot-high high-rock-laid dam with a small reservoir; (2) a 11-foot wide by 12.5-foot... reservations of the United States; (3) would utilize surplus water or water power from a government dam; or (4... modified the project's pre- 1935 design or operation. l. Locations of the Application: Copies of this...

  12. Morphology of the Middle Rio Grande from Cochiti Dam to Bernalillo Bridge, New Mexico

    Treesearch

    Claudia Leon Salazar

    1998-01-01

    The continuous geomorphologic changes in the Middle Rio Grande in New Mexico have been of interest for many governmental agencies involved with the management and operation of this river system. Due to sedimentation problems along this river, highly developed plans for sediment detention and flood control have been carried out. Cochiti Dam was built as a part of these...

  13. Total Dissolved Gas Monitoring in Chum Salmon Spawning Gravels Below Bonneville Dam

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arntzen, Evan V.; Geist, David R.; Panther, Jennifer L.

    2007-01-30

    At the request of the U.S. Army Corps of Engineers (Portland District), Pacific Northwest National Laboratory (PNNL) conducted research to determine whether total dissolved gas concentrations are elevated in chum salmon redds during spring spill operations at Bonneville Dam. The study involved monitoring the total dissolved gas levels at egg pocket depth and in the river at two chum salmon spawning locations downstream from Bonneville Dam. Dissolved atmospheric gas supersaturation generated by spill from Bonneville Dam may diminish survival of chum (Oncorhynchus keta) salmon when sac fry are still present in the gravel downstream from Bonneville Dam. However, no previousmore » work has been conducted to determine whether total dissolved gas (TDG) levels are elevated during spring spill operations within incubation habitats. The guidance used by hydropower system managers to provide protection for pre-emergent chum salmon fry has been to limit TDG to 105% after allowing for depth compensation. A previous literature review completed in early 2006 shows that TDG levels as low as 103% have been documented to cause mortality in sac fry. Our study measured TDG in the incubation environment to evaluate whether these levels were exceeded during spring spill operations. Total dissolved gas levels were measured within chum salmon spawning areas near Ives Island and Multnomah Falls on the Columbia River. Water quality sensors screened at egg pocket depth and to the river were installed at both sites. At each location, we also measured dissolved oxygen, temperature, specific conductance, and water depth to assist with the interpretation of TDG results. Total dissolved gas was depth-compensated to determine when levels were high enough to potentially affect sac fry. This report provides detailed descriptions of the two study sites downstream of Bonneville Dam, as well as the equipment and procedures employed to monitor the TDG levels at the study sites. Results of the monitoring at both sites are then presented in both text and graphics. The findings and recommendations for further research are discussed, followed by a listing of the references cited in the report.« less

  14. Development of a multimetric index for fish assemblages in a cold tailwater in Tennessee

    USGS Publications Warehouse

    Ivasauskas, Tomas J.; Bettoli, Phillip William

    2014-01-01

    Tailwaters downstream of hypolimnetic-release hydropeaking dams exhibit a unique combination of stressors that affects the structure and function of resident fish assemblages. We developed a statistically and biologically defensible multimetric index of fish assemblages for the Caney Fork River below Center Hill Dam, Tennessee. Fish assemblages were sampled at five sites using boat-mounted and backpack electrofishing gear from fall 2009 through summer 2011. A multivariate statistical approach was used to select metrics that best reflected the downstream gradients in abiotic variables. Five metrics derived from boat electrofishing samples and four metrics derived from backpack electrofishing samples were selected for incorporation into the index based on their high correlation with environmental data. The nine metrics demonstrated predictable patterns of increase or decrease with increasing distance downstream of the dam. The multimetric index generally exhibited a pattern of increasing scores with increasing distance from the dam, indicating a downstream recovery gradient in fish assemblage composition. The index can be used to monitor anticipated changes in the fish communities of the Caney Fork River when repairs to Center Hill Dam are completed later this decade, resulting in altered dam operations.

  15. Effect of short-term regulated temperature variations on the swimming economy of Atlantic salmon smolts

    PubMed Central

    Palstra, A. P.

    2017-01-01

    Abstract Migratory species travelling long distances between habitats to spawn or feed are well adapted to optimize their swimming economy. However, human activities, such as river regulation, represent potential threats to fish migration by changing environmental parameters that will have impact on their metabolism. The main objective of this study was to evaluate the changes in the swimming energetics of a salmonid species, Atlantic salmon (Salmo salar L.), caused by short-term temperature variations that usually result from the operation of hydroelectrical dams. Intermittent flow respirometry in swim tunnels allows to obtain high resolution data on oxygen consumption of swimming fish which can reflect aerobic and anaerobic metabolism. This method was used to compare the metabolic rates of oxygen consumption before, during and after sudden thermal change. Control (no temperature variation) and experimental (temperature variation of approximately 4°C in 1 h) swimming trials were conducted to achieve the following objectives: (i) quantify the variations in oxygen consumption associated with abrupt temperature decrease, and (ii) assess if the tested fish return quickly to initial oxygen consumption rates. Main results revealed that Atlantic salmon smolts show a strong response to sudden temperature variation, significantly reducing the oxygen consumption rate up to a seven-fold change. Fish quickly returned to initial swimming costs shortly after reestablishment of temperature values. Results from this study can be used to evaluate the species-specific effects of the applied operation modes by hydroelectrical dams and to increase the success of conservation and management actions directed to fish species inhabiting regulated rivers. PMID:28480037

  16. Effect of short-term regulated temperature variations on the swimming economy of Atlantic salmon smolts.

    PubMed

    Alexandre, C M; Palstra, A P

    2017-01-01

    Migratory species travelling long distances between habitats to spawn or feed are well adapted to optimize their swimming economy. However, human activities, such as river regulation, represent potential threats to fish migration by changing environmental parameters that will have impact on their metabolism. The main objective of this study was to evaluate the changes in the swimming energetics of a salmonid species, Atlantic salmon ( Salmo salar L.), caused by short-term temperature variations that usually result from the operation of hydroelectrical dams. Intermittent flow respirometry in swim tunnels allows to obtain high resolution data on oxygen consumption of swimming fish which can reflect aerobic and anaerobic metabolism. This method was used to compare the metabolic rates of oxygen consumption before, during and after sudden thermal change. Control (no temperature variation) and experimental (temperature variation of approximately 4°C in 1 h) swimming trials were conducted to achieve the following objectives: (i) quantify the variations in oxygen consumption associated with abrupt temperature decrease, and (ii) assess if the tested fish return quickly to initial oxygen consumption rates. Main results revealed that Atlantic salmon smolts show a strong response to sudden temperature variation, significantly reducing the oxygen consumption rate up to a seven-fold change. Fish quickly returned to initial swimming costs shortly after reestablishment of temperature values. Results from this study can be used to evaluate the species-specific effects of the applied operation modes by hydroelectrical dams and to increase the success of conservation and management actions directed to fish species inhabiting regulated rivers.

  17. National Program for Inspection of Non-Federal Dams. Whitmans Pond Dam (MA 00775), Weymouth River Basin, Weymouth, Massachusetts. Phase I Inspection Report.

    DTIC Science & Technology

    1980-08-01

    4 985 G DEPARTMENT OF THE ARMY [ NEW ENGLAND DIVISION, CORPS OF ENGINEERS WALTHAM, MASS. 02154 * DI~~~~h~ U~M ~qE M W A " AUGUST 񓟜 1_App buomr w...AODREO9(if diffemen IC l mMA OfUice) IS. SECURITY CLASS. (of ShJi r.90,) UNCLASSIFIED IS. DC-ASSI FIC ATION/DOWNGRADIN G SCN DULE I6. DISTRIBUTION... g . Purpose of Dam 2 h. Design and Construction History 3 i. Normal Operational Procedure 3 1.3 Pertinent Data 3 2. ENGINEERING DATA 2.1 Design

  18. Surprise and opportunity for learning in Grand Canyon: the Glen Canyon Dam Adaptive Management Program

    USGS Publications Warehouse

    Melis, Theodore S.; Walters, Carl; Korman, Josh

    2015-01-01

    With a focus on resources of the Colorado River ecosystem below Glen Canyon Dam, the Glen Canyon Dam Adaptive Management Program has included a variety of experimental policy tests, ranging from manipulation of water releases from the dam to removal of non-native fish within Grand Canyon National Park. None of these field-scale experiments has yet produced unambiguous results in terms of management prescriptions. But there has been adaptive learning, mostly from unanticipated or surprising resource responses relative to predictions from ecosystem modeling. Surprise learning opportunities may often be viewed with dismay by some stakeholders who might not be clear about the purpose of science and modeling in adaptive management. However, the experimental results from the Glen Canyon Dam program actually represent scientific successes in terms of revealing new opportunities for developing better river management policies. A new long-term experimental management planning process for Glen Canyon Dam operations, started in 2011 by the U.S. Department of the Interior, provides an opportunity to refocus management objectives, identify and evaluate key uncertainties about the influence of dam releases, and refine monitoring for learning over the next several decades. Adaptive learning since 1995 is critical input to this long-term planning effort. Embracing uncertainty and surprise outcomes revealed by monitoring and ecosystem modeling will likely continue the advancement of resource objectives below the dam, and may also promote efficient learning in other complex programs.

  19. 16. DETAIL VIEW OF AUXILIARY LOCK MITER GATE OPERATING MACHINERY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. DETAIL VIEW OF AUXILIARY LOCK MITER GATE OPERATING MACHINERY LOCATED IN INTERMEDIATE WALL, LOOKING NORTHWEST - Upper Mississippi River 9-Foot Channel Project, Lock & Dam 27, Granite City, Madison County, IL

  20. Application of the SHOALS survey system to fisheries investigations in the Columbia River

    USGS Publications Warehouse

    Tiffan, Kenneth F.; Wagner, Paul G.; Wolf, Keith S.; Hoffarth , Paul A.

    2009-01-01

    We used a Scanning Hydrographic Operational Airborne LiDAR (Light Detection and Ranging) Survey (SHOALS) system to collect high-resolution bathymetry for 33 km of the Hanford Reach. Data were used in conjunction with hydrodynamic and predictive habitat models within a GIS (Geographical Information System) framework to evaluate the effects of a varying hydrograph on juvenile fall Chinook salmon rearing habitat and risk from stranding and entrapment. Furthermore, we were able to estimate the number of juvenile fish that were stranded and entrapped in pools when operations at Priest Rapids Dam caused rapid decreases in river flows. Our findings were ultimately used to estimate impacts of power generation operations at Priest Rapids Dam and develop long-term policy and operational guidelines to protect juvenile fall Chinook salmon during the spring rearing period.

  1. Assessing and optimising flood control options along the Arachthos river floodplain (Epirus, Greece)

    NASA Astrophysics Data System (ADS)

    Drosou, Athina; Dimitriadis, Panayiotis; Lykou, Archontia; Kossieris, Panagiotis; Tsoukalas, Ioannis; Efstratiadis, Andreas; Mamassis, Nikos

    2015-04-01

    We present a multi-criteria simulation-optimization framework for the optimal design and setting of flood protection structures along river banks. The methodology is tested in the lower course of the Arachthos River (Epirus, Greece), downstream of the hydroelectric dam of Pournari. The entire study area is very sensitive, particularly because the river crosses the urban area of Arta, which is located just after the dam. Moreover, extended agricultural areas that are crucial for the local economy are prone to floods. In the proposed methodology we investigate two conflicting criteria, i.e. the minimization of flood hazards (due to damages to urban infrastructures, crops, etc.) and the minimization of construction costs of the essential hydraulic structures (e.g. dikes). For the hydraulic simulation we examine two flood routing models, named 1D HEC-RAS and quasi-2D LISFLOOD, whereas the optimization is carried out through the Surrogate-Enhanced Evolutionary Annealing-Simplex (SE-EAS) algorithm that couples the strengths of surrogate modeling with the effectiveness and efficiency of the EAS method.

  2. Malaria and water resource development: the case of Gilgel-Gibe hydroelectric dam in Ethiopia.

    PubMed

    Yewhalaw, Delenasaw; Legesse, Worku; Van Bortel, Wim; Gebre-Selassie, Solomon; Kloos, Helmut; Duchateau, Luc; Speybroeck, Niko

    2009-01-29

    Ethiopia plans to increase its electricity power supply by five-fold over the next five years to fulfill the needs of its people and support the economic growth based on large hydropower dams. Building large dams for hydropower generation may increase the transmission of malaria since they transform ecosystems and create new vector breeding habitats. The aim of this study was to assess the effects of Gilgel-Gibe hydroelectric dam in Ethiopia on malaria transmission and changing levels of prevalence in children. A cross-sectional, community-based study was carried out between October and December 2005 in Jimma Zone, south-western Ethiopia, among children under 10 years of age living in three 'at-risk' villages (within 3 km from dam) and three 'control' villages (5 to 8 km from dam). The man-made Gilgel-Gibe dam is operating since 2004. Households with children less than 10 years of age were selected and children from the selected households were sampled from all the six villages. This included 1,081 children from 'at-risk' villages and 774 children from 'control' villages. Blood samples collected from children using finger prick were examined microscopically to determine malaria prevalence, density of parasitaemia and identify malarial parasite species. Overall 1,855 children (905 girls and 950 boys) were surveyed. A total of 194 (10.5%) children were positive for malaria, of which, 117 (60.3%) for Plasmodium vivax, 76 (39.2%) for Plasmodium falciparum and one (0.5%) for both P. vivax and P. falciparum. A multivariate design-based analysis indicated that, while controlling for age, sex and time of data collection, children who resided in 'at-risk' villages close to the dam were more likely to have P. vivax infection than children who resided farther away (odds ratio (OR) = 1.63, 95% CI = 1.15, 2.32) and showed a higher OR to have P. falciparum infection than children who resided in 'control' villages, but this was not significant (OR = 2.40, 95% CI = 0.84, 6.88). A classification tree revealed insights in the importance of the dam as a risk factor for malaria. Assuming that the relationship between the dam and malaria is causal, 43% of the malaria occurring in children was due to living in close proximity to the dam. This study indicates that children living in close proximity to a man-made reservoir in Ethiopia are at higher risk of malaria compared to those living farther away. It is recommended that sound prevention and control programme be designed and implemented around the reservoir to reduce the prevalence of malaria. In this respect, in localities near large dams, health impact assessment through periodic survey of potential vectors and periodic medical screening is warranted. Moreover, strategies to mitigate predicted negative health outcomes should be integral parts in the preparation, construction and operational phases of future water resource development and management projects.

  3. Malaria and water resource development: the case of Gilgel-Gibe hydroelectric dam in Ethiopia

    PubMed Central

    Yewhalaw, Delenasaw; Legesse, Worku; Van Bortel, Wim; Gebre-Selassie, Solomon; Kloos, Helmut; Duchateau, Luc; Speybroeck, Niko

    2009-01-01

    Background Ethiopia plans to increase its electricity power supply by five-fold over the next five years to fulfill the needs of its people and support the economic growth based on large hydropower dams. Building large dams for hydropower generation may increase the transmission of malaria since they transform ecosystems and create new vector breeding habitats. The aim of this study was to assess the effects of Gilgel-Gibe hydroelectric dam in Ethiopia on malaria transmission and changing levels of prevalence in children. Methods A cross-sectional, community-based study was carried out between October and December 2005 in Jimma Zone, south-western Ethiopia, among children under 10 years of age living in three 'at-risk' villages (within 3 km from dam) and three 'control' villages (5 to 8 km from dam). The man-made Gilgel-Gibe dam is operating since 2004. Households with children less than 10 years of age were selected and children from the selected households were sampled from all the six villages. This included 1,081 children from 'at-risk' villages and 774 children from 'control' villages. Blood samples collected from children using finger prick were examined microscopically to determine malaria prevalence, density of parasitaemia and identify malarial parasite species. Results Overall 1,855 children (905 girls and 950 boys) were surveyed. A total of 194 (10.5%) children were positive for malaria, of which, 117 (60.3%) for Plasmodium vivax, 76 (39.2%) for Plasmodium falciparum and one (0.5%) for both P. vivax and P. falciparum. A multivariate design-based analysis indicated that, while controlling for age, sex and time of data collection, children who resided in 'at-risk' villages close to the dam were more likely to have P. vivax infection than children who resided farther away (odds ratio (OR) = 1.63, 95% CI = 1.15, 2.32) and showed a higher OR to have P. falciparum infection than children who resided in 'control' villages, but this was not significant (OR = 2.40, 95% CI = 0.84, 6.88). A classification tree revealed insights in the importance of the dam as a risk factor for malaria. Assuming that the relationship between the dam and malaria is causal, 43% of the malaria occurring in children was due to living in close proximity to the dam. Conclusion This study indicates that children living in close proximity to a man-made reservoir in Ethiopia are at higher risk of malaria compared to those living farther away. It is recommended that sound prevention and control programme be designed and implemented around the reservoir to reduce the prevalence of malaria. In this respect, in localities near large dams, health impact assessment through periodic survey of potential vectors and periodic medical screening is warranted. Moreover, strategies to mitigate predicted negative health outcomes should be integral parts in the preparation, construction and operational phases of future water resource development and management projects. PMID:19178727

  4. Passage probabilities of juvenile Chinook salmon through the powerhouse and regulating outlet at Cougar Dam, Oregon, 2011

    USGS Publications Warehouse

    Beeman, John W.; Hansen, Amy C.; Evans, Scott D.; Haner, Philip V.; Hansel, Hal C.; Smith, Collin D.

    2012-01-01

    Cougar Dam near Springfield, Oregon, is one of several federally owned and operated flood-control projects within the Willamette Valley of western Oregon that were determined by the National Oceanic and Atmospheric Administration’s National Marine Fisheries Service in 2008 to impact the long-term viability of several salmonid stocks. In response to this ruling, the U.S. Army Corps of Engineers is looking for means to reduce impacts to salmonids, including improving downstream passage of juvenile salmonids at Cougar Dam. This study of juvenile Chinook salmon (Oncorhynchus tshawytscha) passage at Cougar Dam was conducted to inform decisions about potential improvements for downstream fish passage. The primary objective of the study was to estimate route-specific passage probabilities of yearling Chinook salmon at Cougar Dam. The study was conducted using fish from a nearby hatchery surgically implanted with radio transmitters and passive integrated transponder (PIT) tags and released near the entrance of a temperature control tower through which all water going through the dam must pass. Water passing through the temperature control tower may be routed through a penstock to a powerhouse with two Francis turbines, or to a spillway-like structure called the regulating outlet. Secondary objectives of the study were to estimate the probability that fish enter a bypass at a non-federal facility downstream, and to estimate dam-passage and in-river fish survival. Dam operating conditions during the study included an average forebay elevation of 1,580 feet (National Geodetic Vertical Datum of 1929) and an average of 48.2 percent of the total dam discharge of 1,106 cubic feet per second passing through a regulating outlet opening of 1.25 feet. Dam passage probability was greatest at night (0.8741 standard error [SE] 0.0265) and primarily through the regulating outlet (0.8896 SE 0.0617 day; 0.9417 SE 0.0175 night). The joint probability of entering the bypass at Leaburg Dam and being detected at the PIT system within the bypass was 0.0755 (SE 0.0363), but some fish were known to pass the PIT system undetected, indicating that the true probability of entering the bypass was underestimated. The estimated survival of fish passing through the temperature control tower, through the dam, and to a site at a bridge over the South Fork of the McKenzie River 3.9 kilometers downstream was 0.3680 (SE 0.1322) for fish passing through the powerhouse, and 0.4247 (SE 0.0440) for fish passing through the regulating outlet. The estimated in-river survival through the 37.3 kilometers from the bridge to a site at Leaburg Hatchery on the McKenzie River was 0.5857 (SE 0.2227) for fish that had passed through the powerhouse, and 0.4537 (SE 0.0551) for fish that had passed through the regulating outlet.

  5. Upstream movements of Atlantic Salmon in the Lower Penobscot River, Maine following two dam removals and fish passage modifications

    USGS Publications Warehouse

    Izzo, Lisa K.; Maynard, George A.; Zydlewski, Joseph D.

    2016-01-01

    The Penobscot River Restoration Project (PRRP), to be completed in 2016, involved an extensive plan of dam removal, increases in hydroelectric capacity, and fish passage modifications to increase habitat access for diadromous species. As part of the PRRP, Great Works and Veazie dams were removed, making Milford Dam the first impediment to federally endangered Atlantic Salmon Salmo salar. Upstream habitat access for Atlantic Salmon is dependent upon successful and timely passage at Milford Dam because nearly all suitable spawning habitat is located upstream. In 2014 and 2015, a total of 73 adult salmon were radio-tagged to track their upstream movements through the Penobscot River to assess potential delays at (1) the dam remnants, (2) the confluence of the Stillwater Branch and the main stem of the Penobscot River below the impassable Orono Dam, and (3) the Milford Dam fish lift (installed in 2014). Movement rates through the dam remnants and the Stillwater confluence were comparable to open river reaches. Passage efficiency of the fish lift was high in both years (95% and 100%). However, fish experienced long delays at Milford Dam, with approximately one-third of fish taking more than a week to pass in each year, well below the Federal Energy Regulatory Commission passage standard of 95% within 48 h. Telemetry indicates most fish locate the fishway entrance within 5 h of arrival and were observed at the entrance at all hours of the day. These data indicate that overall transit times through the lower river were comparable to reported movement rates prior to changes to the Penobscot River due to the substantial delays seen at Milford Dam. The results of this study show that while adult Atlantic Salmon locate the new fish lift entrance quickly, passage of these fish was significantly delayed under 2014–2015 operations.

  6. Libby Mitigation Program, 2007 Annual Progress Report: Mitigation for the Construction and Operation of Libby Dam.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunnigan, James; DeShazer, J.; Garrow, L.

    Libby Reservoir was created under an International Columbia River Treaty between the United States and Canada for cooperative water development of the Columbia River Basin (Columbia River Treaty 1964). Libby Reservoir inundated 109 stream miles of the mainstem Kootenai River in the United States and Canada, and 40 miles of tributary streams in the U.S. that provided habitat for spawning, juvenile rearing, and migratory passage (Figure 1). The authorized purpose of the dam is to provide power (91.5%), flood control (8.3%), and navigation and other benefits (0.2%; Storm et al. 1982). The Pacific Northwest Power Act of 1980 recognized possiblemore » conflicts stemming from hydroelectric projects in the northwest and directed Bonneville Power Administration to 'protect, mitigate, and enhance fish and wildlife to the extent affected by the development and operation of any hydroelectric project of the Columbia River and its tributaries' (4(h)(10)(A)). Under the Act, the Northwest Power Planning Council was created and recommendations for a comprehensive fish and wildlife program were solicited from the region's federal, state, and tribal fish and wildlife agencies. Among Montana's recommendations was the proposal that research be initiated to quantify acceptable seasonal minimum pool elevations to maintain or enhance the existing fisheries (Graham et al. 1982). Research to determine how operations of Libby Dam affect the reservoir and river fishery and to suggest ways to lessen these effects began in May 1983. The framework for the Libby Reservoir Model (LRMOD) was completed in 1989. Development of Integrated Rule Curves (IRCs) for Libby Dam operation was completed in 1996 (Marotz et al. 1996). The Libby Reservoir Model and the IRCs continue to be refined (Marotz et al 1999). Initiation of mitigation projects such as lake rehabilitation and stream restoration began in 1996. The primary focus of the Libby Mitigation project now is to restore the fisheries and fish habitat in basin streams and lakes. 'Mitigation for the Construction and Operation of Libby Dam' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan.« less

  7. Balancing ecosystem services with energy and food security - Assessing trade-offs from reservoir operation and irrigation investments in Kenya's Tana Basin

    NASA Astrophysics Data System (ADS)

    Hurford, A. P.; Harou, J. J.

    2014-08-01

    Competition for water between key economic sectors and the environment means agreeing allocations is challenging. Managing releases from the three major dams in Kenya's Tana River basin with its 4.4 million inhabitants, 567 MW of installed hydropower capacity, 33 000 ha of irrigation and ecologically important wetlands and forests is a pertinent example. This research seeks firstly to identify and help decision-makers visualise reservoir management strategies which result in the best possible (Pareto-optimal) allocation of benefits between sectors. Secondly, it seeks to show how trade-offs between achievable benefits shift with the implementation of proposed new rice, cotton and biofuel irrigation projects. To approximate the Pareto-optimal trade-offs we link a water resources management simulation model to a multi-criteria search algorithm. The decisions or "levers" of the management problem are volume-dependent release rules for the three major dams and extent of investment in new irrigation schemes. These decisions are optimised for eight objectives covering the provision of water supply and irrigation, energy generation and maintenance of ecosystem services. Trade-off plots allow decision-makers to assess multi-reservoir rule-sets and irrigation investment options by visualising their impacts on different beneficiaries. Results quantify how economic gains from proposed irrigation schemes trade-off against the disturbance of ecosystems and local livelihoods that depend on them. Full implementation of the proposed schemes is shown to come at a high environmental and social cost. The clarity and comprehensiveness of "best-case" trade-off analysis is a useful vantage point from which to tackle the interdependence and complexity of "water-energy-food nexus" resource security issues.

  8. Combining Bioenergetic Responses of Fish to Thermal Regimes and Productivity in Reservoirs: Implications for Conservation and Re-Introduction of Anadromous Salmonids

    NASA Astrophysics Data System (ADS)

    Beauchamp, D.

    2014-12-01

    Temperature, food availability, and predation risk form vertical gradients determining growth and survival for fish in lakes and reservoirs. These gradients change on inter-annual, seasonal, and diel temporal scales and are strongly influenced by climatic variability, conflicting water demands and management. Temperatures associated with optimal growth and energy loss vary both among life stages and species of fish, but the quantity and quality of available food resources can significantly alter these thermal responses. Greater understanding of how water management affects the timing, magnitude, and duration of thermal stratification, and how key species and their supporting aquatic resources respond can improve strategies for development and operation of water storage facilities within the context of localized environmental and ecological constraints. An emerging trend for coldwater reservoirs in the Pacific Northwest has been to re-introduce anadromous salmon above historically impassable dams. Thermal regimes and the existing ecological communities in the reservoirs and tributary habitats above these dams will determine the seasonal importance of lotic and lentic habitats for rearing or migration corridors. The feasibility of reservoir rearing and migration can be evaluated by combining mass- and species-specific thermal growth response curves with temporal dynamics in the vertical and longitudinal thermal structure of reservoirs and associated distribution of food resources (primarily zooplankton). The value of reservoirs as rearing habitats or migration corridors could be compared with coincident tributary conditions to predict the likely temporal-spatial distribution of optimal conditions for growth and survival of different species or life stages of salmonids within the watershed and how these conditions might change under different climatic or water management scenarios.

  9. The arrangement of deformation monitoring project and analysis of monitoring data of a hydropower engineering safety monitoring system

    NASA Astrophysics Data System (ADS)

    Wang, Wanshun; Chen, Zhuo; Li, Xiuwen

    2018-03-01

    The safety monitoring is very important in the operation and management of water resources and hydropower projects. It is the important means to understand the dam running status, to ensure the dam safety, to safeguard people’s life and property security, and to make full use of engineering benefits. This paper introduces the arrangement of engineering safety monitoring system based on the example of a water resource control project. The monitoring results of each monitoring project are analyzed intensively to show the operating status of the monitoring system and to provide useful reference for similar projects.

  10. Seasonal variation of water quality in a lateral hyporheic zone with response to dam operations

    NASA Astrophysics Data System (ADS)

    Chen, X.; Chen, L.; Zhao, J.

    2015-12-01

    Aquatic environment of lateral hyporheic zone in a regulated river were investigated seasonally under fluctuated water levels induced by dam operations. Groundwater levels variations in preassembled wells and changes in electronic conductivity (EC), dissolved oxygen (DO) concentration, water temperature and pH in the hyporheic zone were examined as environmental performance indicators for the water quality. Groundwater tables in wells were highly related to the river water levels that showed a hysteresis pattern, and the lag time is associated with the distances from wells to the river bank. The distribution of DO and EC were strongly related to the water temperature, indicating that the cold water released from up-reservoir could determine the biochemistry process in the hyporheic zone. Results also showed that the hyporheic water was weakly alkaline in the study area but had a more or less uniform spatial distribution. Dam release-storage cycles were the dominant factor in changing lateral hyporheic flow and water quality.

  11. The effect of dams and seasons on malaria incidence and anopheles abundance in Ethiopia

    PubMed Central

    2013-01-01

    Background Reservoirs created by damming rivers are often believed to increase malaria incidence risk and/or stretch the period of malaria transmission. In this paper, we report the effects of a mega hydropower dam on P. falciparum malaria incidence in Ethiopia. Methods A longitudinal cohort study was conducted over a period of 2 years to determine Plasmodium falciparum malaria incidence among children less than 10 years of age living near a mega hydropower dam in Ethiopia. A total of 2080 children from 16 villages located at different distances from a hydropower dam were followed up from 2008 to 2010 using active detection of cases based on weekly house to house visits. Of this cohort of children, 951 (48.09%) were females and 1059 (51.91%) were males, with a median age of 5 years. Malaria vectors were simultaneously surveyed in all the 16 study villages. Frailty models were used to explore associations between time-to-malaria and potential risk factors, whereas, mixed-effects Poisson regression models were used to assess the effect of different covariates on anopheline abundance. Results Overall, 548 (26.86%) children experienced at least one clinical malaria episode during the follow up period with mean incidence rate of 14.26 cases/1000 child-months at risk (95% CI: 12.16 - 16.36). P. falciparum malaria incidence showed no statistically significant association with distance from the dam reservoir (p = 0.32). However, P. falciparum incidence varied significantly between seasons (p < 0.01). The malaria vector, Anopheles arabiensis, was however more abundant in villages nearer to the dam reservoir. Conclusions P. falciparum malaria incidence dynamics were more influenced by seasonal drivers than by the dam reservoir itself. The findings could have implications in timing optimal malaria control interventions and in developing an early warning system in Ethiopia. PMID:23566411

  12. Large-scale projects in the amazon and human exposure to mercury: The case-study of the Tucuruí Dam.

    PubMed

    Arrifano, Gabriela P F; Martín-Doimeadios, Rosa C Rodríguez; Jiménez-Moreno, María; Ramírez-Mateos, Vanesa; da Silva, Núbia F S; Souza-Monteiro, José Rogério; Augusto-Oliveira, Marcus; Paraense, Ricardo S O; Macchi, Barbarella M; do Nascimento, José Luiz M; Crespo-Lopez, Maria Elena

    2018-01-01

    The Tucuruí Dam is one of the largest dams ever built in the Amazon. The area is not highly influenced by gold mining as a source of mercury contamination. Still, we recently noted that one of the most consumed fishes (Cichla sp.) is possibly contaminated with methylmercury. Therefore, this work evaluated the mercury content in the human population living near the Tucuruí Dam. Strict exclusion/inclusion criteria were applied for the selection of participants avoiding those with altered hepatic and/or renal functions. Methylmercury and total mercury contents were analyzed in hair samples. The median level of total mercury in hair was above the safe limit (10µg/g) recommended by the World Health Organization, with values up to 75µg/g (about 90% as methylmercury). A large percentage of the participants (57% and 30%) showed high concentrations of total mercury (≥ 10µg/g and ≥ 20µg/g, respectively), with a median value of 12.0µg/g. These are among the highest concentrations ever detected in populations living near Amazonian dams. Interestingly, the concentrations are relatively higher than those currently shown for human populations highly influenced by gold mining areas. Although additional studies are needed to confirm the possible biomagnification and bioaccumulation of mercury by the dams in the Amazon, our data already support the importance of adequate impact studies and continuous monitoring. More than 400 hydropower dams are operational or under construction in the Amazon, and an additional 334 dams are presently planned/proposed. Continuous monitoring of the populations will assist in the development of prevention strategies and government actions to face the problem of the impacts caused by the dams. Copyright © 2017 Elsevier Inc. All rights reserved.

  13. The potential impact of new Andean dams on Amazon fluvial ecosystems

    PubMed Central

    Melack, John M.; Dunne, Thomas; Barthem, Ronaldo B.; Goulding, Michael; Paiva, Rodrigo C. D.; Sorribas, Mino V.; Silva, Urbano L.; Weisser, Sabine

    2017-01-01

    Increased energy demand has led to plans for building many new dams in the western Amazon, mostly in the Andean region. Historical data and mechanistic scenarios are used to examine potential impacts above and below six of the largest dams planned for the region, including reductions in downstream sediment and nutrient supplies, changes in downstream flood pulse, changes in upstream and downstream fish yields, reservoir siltation, greenhouse gas emissions and mercury contamination. Together, these six dams are predicted to reduce the supply of sediments, phosphorus and nitrogen from the Andean region by 69, 67 and 57% and to the entire Amazon basin by 64, 51 and 23%, respectively. These large reductions in sediment and nutrient supplies will have major impacts on channel geomorphology, floodplain fertility and aquatic productivity. These effects will be greatest near the dams and extend to the lowland floodplains. Attenuation of the downstream flood pulse is expected to alter the survival, phenology and growth of floodplain vegetation and reduce fish yields below the dams. Reservoir filling times due to siltation are predicted to vary from 106–6240 years, affecting the storage performance of some dams. Total CO2 equivalent carbon emission from 4 Andean dams was expected to average 10 Tg y-1 during the first 30 years of operation, resulting in a MegaWatt weighted Carbon Emission Factor of 0.139 tons C MWhr-1. Mercury contamination in fish and local human populations is expected to increase both above and below the dams creating significant health risks. Reservoir fish yields will compensate some downstream losses, but increased mercury contamination could offset these benefits. PMID:28832638

  14. Impacts of large dams on the complexity of suspended sediment dynamics in the Yangtze River

    NASA Astrophysics Data System (ADS)

    Wang, Yuankun; Rhoads, Bruce L.; Wang, Dong; Wu, Jichun; Zhang, Xiao

    2018-03-01

    The Yangtze River is one of the largest and most important rivers in the world. Over the past several decades, the natural sediment regime of the Yangtze River has been altered by the construction of dams. This paper uses multi-scale entropy analysis to ascertain the impacts of large dams on the complexity of high-frequency suspended sediment dynamics in the Yangtze River system, especially after impoundment of the Three Gorges Dam (TGD). In this study, the complexity of sediment dynamics is quantified by framing it within the context of entropy analysis of time series. Data on daily sediment loads for four stations located in the mainstem are analyzed for the past 60 years. The results indicate that dam construction has reduced the complexity of short-term (1-30 days) variation in sediment dynamics near the structures, but that complexity has actually increased farther downstream. This spatial pattern seems to reflect a filtering effect of the dams on the on the temporal pattern of sediment loads as well as decreased longitudinal connectivity of sediment transfer through the river system, resulting in downstream enhancement of the influence of local sediment inputs by tributaries on sediment dynamics. The TGD has had a substantial impact on the complexity of sediment series in the mainstem of the Yangtze River, especially after it became fully operational. This enhanced impact is attributed to the high trapping efficiency of this dam and its associated large reservoir. The sediment dynamics "signal" becomes more spatially variable after dam construction. This study demonstrates the spatial influence of dams on the high-frequency temporal complexity of sediment regimes and provides valuable information that can be used to guide environmental conservation of the Yangtze River.

  15. Efficiency evaluation of agricultural underground dam in South Korea

    NASA Astrophysics Data System (ADS)

    Myoung, W.; Song, S. H.; Yong, H. H.

    2017-12-01

    Climate change has resulted in severe droughts in a rice-planting season (i.e., April to June) in South Korea since 2012. Therefore, all time high-amount water resources in rice-farming seasons (i.e., April to October) were required against natural crises like droughts. The underground dam, which is able to increase groundwater amounts in the alluvium aquifer, has been considered to be an alternative for securing more groundwater resources. In this study, irrigation efficiencies of five pre-existing agricultural underground dams in South Korea were evaluated during the drought periods. A total amount of groundwater storage capacities in alluvial aquifers of these five ones were estimated approximate 15 × 107 m3: above 4 × 106 m3 for two underground dams (Ian, Namsong), 2 3 × 106 m3, for 2 dams (Oksung, Wooil), below 2 × 106 m3 for 1 dam (Gocheon), respectively. Irrigating amounts of groundwater accounted for three underground dams (Ian, Namsong, Gocheon), supplied in rice-farming season are 8.5 × 105 m3/year, 8.3 × 105 m3/year, 6.3 × 105 m3/year, respectively. The total demand of agricultural water in these underground dams is 2.0 × 106 m3/year, 1.9 × 106 m3/year, 2.2 × 106 m3/year, respectively. Irrigating amounts of groundwater accounted for whole of rice-farming area in South Korea is 4.3 × 108 m3/year whereas total demand of agricultural water is 9.4 × 109 m3/year. Groundwater were pumped from the radial collector wells located in the upstream from the underground dams. Oksung underground dam, one representative underground dam located in Chungnam province in South Korea, irrigated approximate 3 × 105 m3 during a dried rice-planting season (between April to June) in 2017. It was three times more than usual (9 × 104 m3). Groundwater levels during the same period maintained above 5.55 m, which was slightly lower than usual (6.00 m). Results of Oksung underground dam demonstrated that underground dams in South Korea were effectively operated against drought. Recently, Korea Rural Community Corporation, a governmental institute of South Korea, plans to construct more underground dams against drought.

  16. First Assessment of Itaipu Dam Ensemble Inflow Forecasting System

    NASA Astrophysics Data System (ADS)

    Mainardi Fan, Fernando; Machado Vieira Lisboa, Auder; Gomes Villa Trinidad, Giovanni; Rógenes Monteiro Pontes, Paulo; Collischonn, Walter; Tucci, Carlos; Costa Buarque, Diogo

    2017-04-01

    Inflow forecasting for Hydropower Plants (HPP) Dams is one of the prominent uses for hydrological forecasts. A very important HPP in terms of energy generation for South America is the Itaipu Dam, located in the Paraná River, between Brazil and Paraguay countries, with a drainage area of 820.000km2. In this work, we present the development of an ensemble forecasting system for Itaipu, operational since November 2015. The system is based in the MGB-IPH hydrological model, includes hydrodynamics simulations of the main river, and is run every day morning forced by seven different rainfall forecasts: (i) CPTEC-ETA 15km; (ii) CPTEC-BRAMS 5km; (iii) SIMEPAR WRF Ferrier; (iv) SIMEPAR WRF Lin; (v) SIMEPAR WRF Morrison; (vi) SIMEPAR WRF WDM6; (vii) SIMEPAR MEDIAN. The last one (vii) corresponds to the median value of SIMEPAR WRF model versions (iii to vi) rainfall forecasts. Besides the developed system, the "traditional" method for inflow forecasting generation for the Itaipu Dam is also run every day. This traditional method consists in the approximation of the future inflow based on the discharge tendency of upstream telemetric gauges. Nowadays, after all the forecasts are run, the hydrology team of Itaipu develop a consensus forecast, based on all obtained results, which is the one used for the Itaipu HPP Dam operation. After one year of operation a first evaluation of the Ensemble Forecasting System was conducted. Results show that the system performs satisfactory for rising flows up to five days lead time. However, some false alarms were also issued by most ensemble members in some cases. And not in all cases the system performed better than the traditional method, especially during hydrograph recessions. In terms of meteorological forecasts, some members usage are being discontinued. In terms of the hydrodynamics representation, it seems that a better information of rivers cross section could improve hydrographs recession curves forecasts. Those opportunities for improvements are currently being addressed in the system next update.

  17. Learning the ropes at Richard B. Russell Dam: Net systems for medium head hydropower pumpback and generation fish sampling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schilt, C.R.; Vu, P.D.; Nestler, J.M.

    1995-12-31

    At Richard B. Russell Dam on the Savannah River we have been monitoring the magnitude (numbers and masses) and species compositions as well as possible survival of fish entrained in operation of four 85 MW Francis pump turbines. In this paper we review our progress in net design for hydropower application. We also discuss basic net handling and introduce a method for net management in a very turbulent tailrace. This report is meant to share what we have learned at Russell Dam in hopes that it will facilitate similar efforts elsewhere. The commercial fishing industry has evolved methods of netmore » construction and handling that may be applied, with appropriate modification, at dams. The nets we use are most appropriately called trawls in that they have the form of a long sock placed over the penstock or draft tube. These nets are superficially similar to those used in commercial trawling for fish. Important differences are that: (1) the net remains relatively stationary while the water moves through it, not vice versa; (2) water velocities and turbulence are much greater at dams than in commercial fishing operations and (3) mesh sizes are much smaller for environmental sampling than for commercial trawling. And while a fouled trawl may stop the boat that pulls it, the water passed in generation or pumpback (about 140 ft. head at Russell) is for all practical purposes unstoppable. Our nets fish in a very turbulent discharge at 7,000 cu. ft./sec/turbine. Their strength and their ability to pass water effectively under all possible operating conditions are primary concerns. Trawl length, mesh sizes, and hanging ratios are important factors. Although we have had setbacks (usually in the form of torn nets) as this study has developed, we have incrementally improved our net design and handling. We review our net failures and the solutions we have found thus far in both construction and handling.« less

  18. Evaluation of decision making and negotiation processes under uncertainties regarding the water management of Peiros-Parapeiros Dam, in Achaia Region (Greece).

    NASA Astrophysics Data System (ADS)

    Podimata, Marianthi V.; Yannopoulos, Panayotis C.

    2015-04-01

    Water managers, decision-makers, water practitioners and others involved in Integrated Water Resources Management often encounter the problem of finding a joint agreement among stakeholders concerning the management of a common water body. Handling conflict situations/disputes over water issues and finding an acceptable joint solution remain a thorny issue in water negotiation processes, since finding a formula for wise, fair and sustainable management of a water resource is a complex process that includes environmental, economic, technical, socio-political criteria and their uncertainties. Decision Support Systems and Adaptive Management are increasingly used in that direction. To assist decision makers in handling water disputes and execute negotiations, a conceptual tool is required. The Graph Model for Conflict Resolution is a Decision Support flexible tool for negotiation support regarding water conflicts. It includes efficient algorithms for estimating strategic moves of water stakeholders, even though there is a lack of detail concerning their real motives and prospects. It calculates the stability of their states and encourages what-if analyses. This paper presents a case study of water decision makers' evaluations concerning the management of up-coming technical infrastructure Peiros-Parapeiros Dam, in Achaia Region (Greece). The continuous consultations between institutions and representatives revealed that the formation of a joint agreement between stakeholders is not easy, due to arising conflicts and contradictions regarding the jurisdiction and legal status of the dam operator and the cost undertaking of the dam operation. This paper analyzes the positions of the parties involved in the consultation process and examines possible conflict resolution states, using GMCR II. This methodology tries to minimize uncertainty to a certain extent concerning the possible moves/decisions of involved parties regarding the operation and management of the dam by developing and simulating potential strategic interactions and multilateral negotiations and finding confidence-building cooperation schemes (cooperative arrangements) over water use and management.

  19. 18. EASTERLY VIEW ALONG THE SPILLWAY BUCKET, SHOWING CONSTRUCTION OPERATIONS.... ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. EASTERLY VIEW ALONG THE SPILLWAY BUCKET, SHOWING CONSTRUCTION OPERATIONS.... Volume XX, No. 5, September 5, 1940. - Prado Dam, Spillway, Santa Ana River near junction of State Highways 71 & 91, Corona, Riverside County, CA

  20. Development and evaluation of a reservoir model for the Chain of Lakes in Illinois

    USGS Publications Warehouse

    Domanski, Marian M.

    2017-01-27

    Forecasts of flows entering and leaving the Chain of Lakes reservoir on the Fox River in northeastern Illinois are critical information to water-resource managers who determine the optimal operation of the dam at McHenry, Illinois, to help minimize damages to property and loss of life because of flooding on the Fox River. In 2014, the U.S. Geological Survey; the Illinois Department of Natural Resources, Office of Water Resources; and National Weather Service, North Central River Forecast Center began a cooperative study to develop a system to enable engineers and planners to simulate and communicate flows and to prepare proactively for precipitation events in near real time in the upper Fox River watershed. The purpose of this report is to document the development and evaluation of the Chain of Lakes reservoir model developed in this study.The reservoir model for the Chain of Lakes was developed using the Hydrologic Engineering Center–Reservoir System Simulation program. Because of the complex relation between the dam headwater and reservoir pool elevations, the reservoir model uses a linear regression model that relates dam headwater elevation to reservoir pool elevation. The linear regression model was developed using 17 U.S. Geological Survey streamflow measurements, along with the gage height in the reservoir pool and the gage height at the dam headwater. The Nash-Sutcliffe model efficiency coefficients for all three linear regression model variables ranged from 0.90 to 0.98.The reservoir model performance was evaluated by graphically comparing simulated and observed reservoir pool elevation time series during nine periods of high pool elevation. In addition, the peak elevations during these time periods were graphically compared to the closest-in-time observed pool elevation peak. The mean difference in the simulated and observed peak elevations was -0.03 feet, with a standard deviation of 0.19 feet. The Nash-Sutcliffe coefficient for peak prediction was calculated as 0.94. Evaluation of the model based on accuracy of peak prediction and the ability to simulate an elevation time series showed the performance of the model was satisfactory.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoffman, Greg; Marotz, Brian L.; Dunnigan, James

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power Planning Council's resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biologicalmore » effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness.« less

  2. Factors governing sustainable groundwater pumping near a river.

    PubMed

    Zhang, Yingqi; Hubbard, Susan; Finsterle, Stefan

    2011-01-01

    The objective of this paper was to provide new insights into processes affecting riverbank filtration (RBF). We consider a system with an inflatable dam installed for enhancing water production from downstream collector wells. Using a numerical model, we investigate the impact of groundwater pumping and dam operation on the hydrodynamics in the aquifer and water production. We focus our study on two processes that potentially limit water production of an RBF system: the development of an unsaturated zone and riverbed clogging. We quantify river clogging by calibrating a time-dependent riverbed permeability function based on knowledge of pumping rate, river stage, and temperature. The dynamics of the estimated riverbed permeability reflects clogging and scouring mechanisms. Our results indicate that (1) riverbed permeability is the dominant factor affecting infiltration needed for sustainable RBF production; (2) dam operation can influence pumping efficiency and prevent the development of an unsaturated zone beneath the riverbed only under conditions of sufficient riverbed permeability; (3) slow river velocity, caused by dam raising during summer months, may lead to sedimentation and deposition of fine-grained material within the riverbed, which may clog the riverbed, limiting recharge to the collector wells and contributing to the development of an unsaturated zone beneath the riverbed; and (4) higher river flow velocities, caused by dam lowering during winter storms, scour the riverbed and thus increase its permeability. These insights can be used as the basis for developing sustainable water management of a RBF system. Journal compilation © 2010 National Ground Water Association. No claim to original US government works.

  3. Research Furthers Conservation of Grand Canyon Sandbars

    USGS Publications Warehouse

    Melis, Theodore S.; Topping, David J.; Rubin, David M.; Wright, Scott A.

    2007-01-01

    Grand Canyon National Park lies approximately 25 km (15 mi) down-river from Glen Canyon Dam, which was built on the Colorado River just south of the Arizona-Utah border in Glen Canyon National Recreation Area. Before the dam began to regulate the Colorado River in 1963, the river carried such large quantities of red sediment, for which the Southwest is famous, that the Spanish named the river the Rio Colorado, or 'red river'. Today, the Colorado River usually runs clear below Glen Canyon Dam because the dam nearly eliminates the main-channel sand supply. The daily and seasonal flows of the river were also altered by the dam. These changes have disrupted the sedimentary processes that create and maintain Grand Canyon sandbars. Throughout Grand Canyon, sandbars create habitat for native plants and animals, supply camping beaches for river runners and hikers, and provide sediment needed to protect archaeological resources from weathering and erosion. Maintenance of sandbars in the Colorado River ecosystem, the river corridor that stretches from the dam to the western boundary of Grand Canyon National Park, is a goal of the Glen Canyon Dam Adaptive Management Program. The program is a federally authorized initiative to ensure that the mandates of the Grand Canyon Protection Act of 1992 are met through advances in information and resource management. The U.S. Geological Survey's Grand Canyon Monitoring and Research Center has responsibility for scientific monitoring and research efforts for the program. Extensive research and monitoring during the past decade have resulted in the identification of possible alternatives for operating Glen Canyon Dam that hold new potential for the conservation of sand resources.

  4. State of the dam at the Zeya hydroelectric station with consideration of the geodynamic effect

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marchuk, A.N.; Dudchenko, L.N.; Bolgov, V.V.

    1995-11-01

    The buttress dam of the Zeya hydroelectric station has already been operating successfully for 20 years under complex climatic, geological, and seismological conditions. Additional difficulties are created by some uncertainty of the interaction of the structure with the geological environment subjected to tectonic movements. The seismotectonic conditions of the region of the Zeya reservoir are determined by proximity to the boundary of two large structural zones with a different character of tectonic movements: regions of the uplift of the Tukuringra-Soktokhan Range and the downwarping Amur-Zeya Plateau. This boundary is represented by the Pkan fault located about 1 km from themore » dam on the downstream side.« less

  5. High-resolution topography and geomorphology of select archeological sites in Glen Canyon National Recreation Area, Arizona

    USGS Publications Warehouse

    Collins, Brian D.; Corbett, Skye C.; Sankey, Joel B.; Fairley, Helen C.

    2014-01-01

    Along the Colorado River corridor between Glen Canyon Dam and Lees Ferry, Arizona, located some 25 km downstream from the dam, archaeological sites dating from 8,000 years before present through the modern era are located within and on top of fluvial and alluvial terraces of the prehistorically undammed river. These terraces are known to have undergone significant erosion and retreat since emplacement of Glen Canyon Dam in 1963. Land managers and policy makers associated with managing the flow of the Colorado River are interested in understanding how the operations of Glen Canyon Dam have affected the archeological sites associated with these terraces and how dam-controlled flows currently interact with other landscape-shaping processes. In 2012, the U.S. Geological Survey initiated a research project in Glen Canyon to study the types and causes of erosion of the terraces. This report provides the first step towards this understanding by presenting comparative analyses on several types of high-resolution topographic data (airborne lidar, terrestrial lidar, and airborne photogrammetry) that can be used in the future to document and analyze changes to terrace-based archaeological sites. Herein, we present topographic and geomorphologic data of four archaeological sites within a 14 km segment of Glen Canyon using each of the three data sources. In addition to comparing each method’s suitability for adequately representing the topography of the sites, we also analyze the data within each site’s context and describe the geomorphological processes responsible for erosion. Our results show that each method has its own strengths and weaknesses, and that terrestrial and airborne lidar are essentially interchangeable for many important topographic characterization and monitoring purposes. However, whereas terrestrial lidar provides enhanced capacity for feature recognition and gully morphology delineation, airborne methods (whether by way of laser or optical sensors) are better suited for reach- and regional-scale mapping. Our site-specific geomorphic analyses of the four archeological sites indicate that their current topographical conditions are a result of different and sometimes competing erosional agents, including bedrock- and terrace-based overland flow, fluvial-induced terrace bank collapse, and alluvial-fan-generated debris flows. Although the influences of anthropogenic-induced erosion from dam operations are not specifically analyzed in this report, we do identify geomorphic settings where dam operations are either more or less likely to affect archeological site stability. This information can be used to assist with future monitoring efforts of these sites and identification of similar conditions for other archeological sites along the Colorado River corridor in Glen Canyon.

  6. An environmental streamflow assessment for the Santiam River basin, Oregon

    USGS Publications Warehouse

    Risley, John C.; Wallick, J. Rose; Mangano, Joseph F.; Jones, Krista L.

    2012-01-01

    The Santiam River is a tributary of the Willamette River in northwestern Oregon and drains an area of 1,810 square miles. The U.S. Army Corps of Engineers (USACE) operates four dams in the basin, which are used primarily for flood control, hydropower production, recreation, and water-quality improvement. The Detroit and Big Cliff Dams were constructed in 1953 on the North Santiam River. The Green Peter and Foster Dams were completed in 1967 on the South Santiam River. The impacts of the structures have included a decrease in the frequency and magnitude of floods and an increase in low flows. For three North Santiam River reaches, the median of annual 1-day maximum streamflows decreased 42–50 percent because of regulated streamflow conditions. Likewise, for three reaches in the South Santiam River basin, the median of annual 1-day maximum streamflows decreased 39–52 percent because of regulation. In contrast to their effect on high flows, the dams increased low flows. The median of annual 7-day minimum flows in six of the seven study reaches increased under regulated streamflow conditions between 60 and 334 percent. On a seasonal basis, median monthly streamflows decreased from February to May and increased from September to January in all the reaches. However, the magnitude of these impacts usually decreased farther downstream from dams because of cumulative inflow from unregulated tributaries and groundwater entering the North, South, and main-stem Santiam Rivers below the dams. A Wilcox rank-sum test of monthly precipitation data from Salem, Oregon, and Waterloo, Oregon, found no significant difference between the pre-and post-dam periods, which suggests that the construction and operation of the dams since the 1950s and 1960s are a primary cause of alterations to the Santiam River basin streamflow regime. In addition to the streamflow analysis, this report provides a geomorphic characterization of the Santiam River basin and the associated conceptual framework for assessing possible geomorphic and ecological changes in response to river-flow modifications. Suggestions for future biomonitoring and investigations are also provided. This study was one in a series of similar tributary streamflow and geomorphic studies conducted for the Willamette Sustainable Rivers Project. The Sustainable Rivers Project is a national effort by the USACE and The Nature Conservancy to develop environmental flow requirements in regulated river systems.

  7. Downstream impacts of a Central Amazonian hydroelectric dam on tree growth and mortality in floodplain forests

    NASA Astrophysics Data System (ADS)

    Resende, A. F. D.; Silva, T. S. F.; Silva, J. D. S.; Piedade, M. T. F.; Streher, A. S.; Ferreira-Ferreira, J.; Schongart, J.

    2017-12-01

    The flood pulse of large Amazonian Rivers is characterized by predictable high- and low-water periods during the annual cycle, and is the main driving force in the floodplains regulating decomposition, nutrient cycles, productivity, life cycles and growth rhythms of floodplains' biota. Over at least 20 millions of years, tree species in these ecosystems developed complex adaptative mechanisms to tolerate flooding, such as the tree species Macrolobium acaciifolium (Fabaceae) and Eschweilera tenuifolia (Lecythidaceae) occupying the lower topographic positions in the floodplain forests along the oligothrophic black-water rivers. Tree growth occurs mainly during terrestrial phase, while during the aquatic phase the anoxic conditions result into a cambial dormancy and formation of annual tree rings. The hydroelectric dam Balbina which was installed in the Uatumã River (central Amazonia) during the 1980s altered significantly the flood pulse regime resulting into higher minimum and lower maximum annual water levels. The suppression of the terrestrial phase caused large-scale mortality of flood-adapted trees growing on the lower topographic positions, as evidenced by radiocarbon dating and cross-dating techniques (dendrochronology). In this study we estimated the extension of dead forests using high resolution ALOS/PALSAR radar images, for their detection along a fluvial distance of more than 280 km downstream of the power plant. Further we analyzed tree growth of 60 living individuals of E. tenuifolia by tree-ring analyses comparing the post- and pre-dam periods. We evaluated the impacts of the altered hydrological regime on tree growth considering ontogenetic effects and the fluvial distance of the trees to the dam. Since the Balbina power plant started operating the associated igapó forests lost about 11% of its cover. We found a significant reduction of tree growth of E. tenuifolia during the post-dam period as a consequence of the increasing aquatic phase duration. This impact was stronger for younger trees (<200 yr) and for those growing closer to the hydroelectric dam (<100 km distance). Considering the planning of construction of several dozen dams in the Amazon there is an urgent need to consider these downstream impacts in all discussions of hydroelectric power plants implementation and operation.

  8. Evaluate the Restoration Potential of Snake River Fall Chinook Salmon Spawning Habitat, Status Report 2006.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hanrahan, T.P.

    2009-01-08

    The Bonneville Power Administration (BPA) Project 2003-038-00, Evaluate the restoration potential of Snake River fall Chinook salmon spawning habitat, began in FY04 (15 December 2003) and continues into FY06. This status report is intended to summarize accomplishments during FY04 and FY05. Accomplishments are summarized by Work Elements, as detailed in the Statement of Work (see BPA's project management database PISCES). This project evaluates the restoration potential of mainstem habitats for fall Chinook salmon. The studies address two research questions: 'Are there sections not currently used by spawning fall Chinook salmon within the impounded lower Snake River that possess the physicalmore » characteristics for potentially suitable fall Chinook spawning habitat?' and 'Can hydrosystem operations affecting these sections be adjusted such that the sections closely resemble the physical characteristics of current fall Chinook salmon spawning areas in similar physical settings?' Efforts are focused at two study sites: (1) the Ice Harbor Dam tailrace downstream to the Columbia River confluence, and (2) the Lower Granite Dam tailrace. Our previous studies indicated that these two areas have the highest potential for restoring Snake River fall Chinook salmon spawning habitat. The study sites will be evaluated under existing structural configurations at the dams (i.e., without partial removal of a dam structure), and alternative operational scenarios (e.g., varying forebay/tailwater elevations). The areas studied represent tailwater habitat (i.e., riverine segments extending from a dam downstream to the backwater influence from the next dam downstream). We are using a reference site, indicative of current fall Chinook salmon spawning areas in tailwater habitat, against which to compare the physical characteristics of each study site. The reference site for tailwater habitats is the section extending downstream from the Wanapum Dam tailrace on the Columbia River. Escapement estimates for fall of 2000 indicate more than 9000 adult fall Chinook salmon returned to this area, accounting for more than 2100 redds within a 5 km section of river.« less

  9. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1991 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hawkes, Lynette A.; Martinson, Rick D.; Smith, W. William

    1992-04-01

    The 1991 smolt monitoring project of the National Marine Fisheries Service provided data on the seaward migration of juvenile salmon and steelhead at John Day, The Dalles and Bonneville Dams. All pertinent fish capture and condition data as well as dam operations and river flow data were provided to Fish Passage Center for use in developing fish passage indices and migration timing, and for water budget and spill management.

  10. Solomon Gulch hydroelectric project takes shape

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The planning and current construction activities for the Solomon Gulch hydroelectric plant near Valdez, Alaska which is scheduled for dam completion in 1980 and power plant operation in 1981 are discussed. The main dam will be 115 ft high and 360 ft wide. The two paralled 48-in. dia penstocks will be constructed from surplus pipe left over from the Alaska pipeline project. Construction on the 12 MW plant began in October 1978. (LCL)

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.; Skalski, J. R.; Carlson, Thomas J.

    The acoustic telemetry study reported here was conducted by researchers at Pacific Northwest National Laboratory (PNNL) and the University of Washington (UW) for the U.S. Army Corps of Engineers, Portland District (USACE). The purpose of the study was to estimate dam passage survival and other performance measures for yearling and subyearling Chinook salmon and steelhead at The Dalles Dam as stipulated by the 2008 Biological Opinion on operation of the Federal Columbia River Power System (FCRPS) and 2008 Columbia Basin Fish Accords.

  12. 78 FR 4071 - Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-18

    ... hazards associated with the U.S. Army Corps of Engineers Electromagnetic Fields evaluation operations... Michigan has determined that the U.S. Army Corps of Engineers Electromagnetic Fields evaluation operations...

  13. Contaminants of emerging concern in the Hartbeespoort Dam catchment and the uMngeni River estuary 2016 pollution incident, South Africa.

    PubMed

    Rimayi, Cornelius; Odusanya, David; Weiss, Jana M; de Boer, Jacob; Chimuka, Luke

    2018-06-15

    A quantitative assessment of pollutants of emerging concern in the Hartbeespoort Dam catchment area was conducted using liquid chromatography-tandem mass spectrometry (LC-MS/MS) to establish the occurrence, source and distribution of 15 environmental pollutants, including 10 pharmaceuticals, 1 pesticide and 4 steroid hormones. Seasonal sampling was conducted in the Hartbeespoort Lake using sub-surface grab sampling to determine the lake's ecological status and obtain data for establishment of progressive operational monitoring. The Jukskei River, which lies upstream of the Hartbeespoort Dam, was sampled in the winter season. Five year old carp (Cyprinus carpio) and catfish (Clarias gariepinus) were also sampled from the Hartbeespoort Dam to study bioaccumulation in biota as well as to estimate risk associated with fish consumption. In the Jukskei River, the main source of 11 emerging pollutants (EPs) was identified as raw sewage overflow, with the highest ∑11 EP concentration of 593ngL -1 being recorded at the Midrand point and the lowest ∑11 EP concentration of 164ngL -1 at the N14 site located 1km downstream of a large wastewater treatment plant. The Jukskei River was found to be the largest contributor of the emerging contaminants detected in the Hartbeespoort Dam. In the Hartbeespoort Dam EP concentrations were generally in the order efavirenz>nevirapine>carbamazepine>methocarbamol>bromacil>venlafaxine. Water and sediment were sampled from the uMngeni River estuary within 24h after large volumes of an assortment of pharmaceutical waste had been discovered to be washed into the river estuary after flash rainfall on 18 May 2016. Analytical results revealed high levels of some emerging pollutants in sediment samples, up to 81ngg -1 for nevirapine and 4ngg -1 for etilefrine HCL. This study shows that efavirenz, nevirapine, carbamazepine, methocarbamol, bromacil and venlafaxine are contaminants that require operational monitoring in South African urban waters. Copyright © 2018. Published by Elsevier B.V.

  14. Ex post power economic analysis of record of decision operational restrictions at Glen Canyon Dam.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Veselka, T. D.; Poch, L. A.; Palmer, C. S.

    On October 9, 1996, Bruce Babbitt, then-Secretary of the U.S. Department of the Interior signed the Record of Decision (ROD) on operating criteria for the Glen Canyon Dam (GCD). Criteria selected were based on the Modified Low Fluctuating Flow (MLFF) Alternative as described in the Operation of Glen Canyon Dam, Colorado River Storage Project, Arizona, Final Environmental Impact Statement (EIS) (Reclamation 1995). These restrictions reduced the operating flexibility of the hydroelectric power plant and therefore its economic value. The EIS provided impact information to support the ROD, including an analysis of operating criteria alternatives on power system economics. This exmore » post study reevaluates ROD power economic impacts and compares these results to the economic analysis performed prior (ex ante) to the ROD for the MLFF Alternative. On the basis of the methodology used in the ex ante analysis, anticipated annual economic impacts of the ROD were estimated to range from approximately $15.1 million to $44.2 million in terms of 1991 dollars ($1991). This ex post analysis incorporates historical events that took place between 1997 and 2005, including the evolution of power markets in the Western Electricity Coordinating Council as reflected in market prices for capacity and energy. Prompted by ROD operational restrictions, this analysis also incorporates a decision made by the Western Area Power Administration to modify commitments that it made to its customers. Simulated operations of GCD were based on the premise that hourly production patterns would maximize the economic value of the hydropower resource. On the basis of this assumption, it was estimated that economic impacts were on average $26.3 million in $1991, or $39 million in $2009.« less

  15. Stakeout surveys for check dams in gullied areas by using the FreeXSap photogrammetric method

    NASA Astrophysics Data System (ADS)

    Castillo, Carlos; Marín-Moreno, Víctor; Taguas, Encarnación V.

    2017-04-01

    Prior to any check dam construction work, it is necessary to carry out field stakeout surveys to define the layout of the dam series according to spacing criteria. While in expensive and complex settings, accurate measurement techniques might be justified (e.g. differential GPS), for small to medium-sized check dams typical of areas affected by gully erosion, simpler methodologies might be more cost-efficient. Innovative 3D photogrammetric techniques based on Structure-from-Motion (SfM) algorithms have proved to be useful across different geomorphological applications and have been successfully applied for gully assessment. In this communication, we present an efficient methodology consisting of the application of a free interface for photogrammetric reconstruction (FreeXSap) combined with simple distance measurements to obtain channel cross-sections determining the width and height of the check dam for a particular cross-section. We will illustrate its use for a hundred-meter-long gully under conventional agriculture in Córdoba (Spain). FreeXSap is an easy-to-use graphical user interface written in Matlab Code (Mathworks, 2016) for the reconstruction of 3D models from image sets taken with digital consumer-grade cameras. The SfM algorithms are based on MicMac scripts (Pierrot-Deseilligny and Cléry, 2011) along with routines specifically developed for the orientation, determination and geometrical analysis of cross-sections. It only requires the collection of a few pictures of a channel cross-section (normally below 5) by the camera operator to build an accurate 3D model, while a second operator holds a pole in vertical position (with the help of a bubble level attached to the pole) in order to provide orientation and scale for further processing. The spacing between check dams was determined using the head-to-toe rule by using a clinometer App on a Smartphone. In this work we will evaluate the results of the application of this methodology in terms of time and cost requirements and the capabilities and operation procedure of FreeXSap will be presented. This tool will be available for free download. REFERENCES Pierrot-Deseilligny, M and Cléry, I. APERO, an Open Source Bundle Adjusment Software for Automatic Calibration and Orientation of a Set of Images. Proceedings of the ISPRS Commission V Symposium, Image Engineering and Vision Metrology, Trento, Italy, 2-4 March 2011.

  16. Monitoring the ongoing deformation and seasonal behaviour affecting Mosul Dam through space-borne SAR data

    NASA Astrophysics Data System (ADS)

    Tessari, G.; Riccardi, P.; Pasquali, P.

    2017-12-01

    Monitoring of dam structural health is an important practice to control the structure itself and the water reservoir, to guarantee efficient operation and safety of surrounding areas. Ensuring the longevity of the structure requires the timely detection of any behaviour that could deteriorate the dam and potentially result in its shutdown or failure.The detection and monitoring of surface displacements is increasingly performed through the analysis of satellite Synthetic Aperture Radar (SAR) data, thanks to the non-invasiveness of their acquisition, the possibility to cover large areas in a short time and the new space missions equipped with high spatial resolution sensors. The availability of SAR satellite acquisitions from the early 1990s enables to reconstruct the historical evolution of dam behaviour, defining its key parameters, possibly from its construction to the present. Furthermore, the progress on SAR Interferometry (InSAR) techniques through the development of Differential InSAR (DInSAR) and Advanced stacking techniques (A-DInSAR) allows to obtain accurate velocity maps and displacement time-series.The importance of these techniques emerges when environmental or logistic conditions do not allow to monitor dams applying the traditional geodetic techniques. In such cases, A-DInSAR constitutes a reliable diagnostic tool of dam structural health to avoid any extraordinary failure that may lead to loss of lives.In this contest, an emblematic case will be analysed as test case: the Mosul Dam, the largest Iraqi dam, where monitoring and maintaining are impeded for political controversy, causing possible risks for the population security. In fact, it is considered one of the most dangerous dams in the world because of the erosion of the gypsum rock at the basement and the difficult interventions due to security problems. The dam consists of 113 m tall and 3.4 km long earth-fill embankment-type, with a clay core, and it was completed in 1984.The deformation fields obtained from SAR data are evaluated to assess the temporal evolution of the strains affecting the structure. Obtained results represent the preliminary stage of a multidisciplinary project, finalized to assess possible damages affecting a dam through remote sensing and civil engineering surveys.

  17. Investigation on trophic state index by artificial neural networks (case study: Dez Dam of Iran)

    NASA Astrophysics Data System (ADS)

    Saghi, H.; Karimi, L.; Javid, A. H.

    2015-06-01

    Dam construction and surface runoff control is one of the most common approaches for water-needs supply of human societies. However, the increasing development of social activities and hence the subsequent increase in environmental pollutants leads to deterioration of water quality in dam reservoirs and eutrophication process could be intensified. So, the water quality of reservoirs is now one of the key factors in operation and water quality management of reservoirs. Hence, maintaining the quality of the stored water and identification and examination of changes along time has been a constant concern of humans that involves the water authorities. Traditionally, empirical trophic state indices of dam reservoirs often defined based on changes in concentration of effective factors (nutrients) and its consequences (increase in chlorophyll a), have been used as an efficient tool in the definition of dam reservoirs quality. In recent years, modeling techniques such as artificial neural networks have enhanced the prediction capability and the accuracy of these studies. In this study, artificial neural networks have been applied to analyze eutrophication process in the Dez Dam reservoir in Iran. In this paper, feed forward neural network with one input layer, one hidden layer and one output layer was applied using MATLAB neural network toolbox for trophic state index (TSI) analysis in the Dez Dam reservoir. The input data of this network are effective parameters in the eutrophication: nitrogen cycle parameters and phosphorous cycle parameters and parameters that will be changed by eutrophication: Chl a, SD, DO and the output data is TSI. Based on the results from estimation of modified Carlson trophic state index, Dez Dam reservoir is considered to be eutrophic in the early July to mid-November and would be mesotrophic with decrease in temperature. Therefore, a decrease in water quality of the dam reservoir during the warm seasons is expectable. The results indicated that artificial neural network (ANN) is a suitable tool for quality modeling of reservoir of dam and increment and decrement of nutrients in trend of eutrophication. Therefore, ANN is a suitable tool for quality modeling of reservoir of dam.

  18. Application of artificial neural network model for groundwater level forecasting in a river island with artificial influencing factors

    NASA Astrophysics Data System (ADS)

    Lee, Sanghoon; Yoon, Heesung; Park, Byeong-Hak; Lee, Kang-Kun

    2017-04-01

    Groundwater use has been increased for various purposes like agriculture, industry or drinking water in recent years, the issue related to sustainability on the groundwater use also has been raised. Accordingly, forecasting the groundwater level is of great importance for planning sustainable use of groundwater. In a small island surrounded by the Han River, South Korea, seasonal fluctuation of the groundwater level is characterized by multiple factors such as recharge/discharge event of the Paldang dam, Water Curtain Cultivation (WCC) during the winter season, operation of Groundwater Heat Pump System (GWHP). For a period when the dam operation is only occurred in the study area, a prediction of the groundwater level can be easily achieved by a simple cross-correlation model. However, for a period when the WCC and the GWHP systems are working together, the groundwater level prediction is challenging due to its unpredictable operation of the two systems. This study performed Artificial Neural Network (ANN) model to forecast the groundwater level in the river area reflecting the various predictable/unpredictable factors. For constructing the ANN models, two monitoring wells, YSN1 and YSO8, which are located near the injection and abstraction wells for the GWHP system were selected, respectively. By training with the groundwater level data measured in January 2015 to August 2015, response of groundwater level by each of the surface water level, the WCC and the GWHP system were evaluated. Consequentially, groundwater levels in December 2015 to March 2016 were predicted by ANN models, providing optimal fits in comparison to the observed water levels. This study suggests that the ANN model is a useful tool to forecast the groundwater level in terms of the management of groundwater. Acknowledgement : Financial support was provided by the "R&D Project on Environmental Management of Geologic CO2 Storage" from the KEITI (Project Number: 2014001810003) This research was supported by "BK 21plus project of the Korean Government"

  19. 28. DOWNSTREAM VIEW OF ROCK PAVING OPERATIONS ON LEFT BANK ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. DOWNSTREAM VIEW OF ROCK PAVING OPERATIONS ON LEFT BANK OF OUTLET CHANNEL.... Volume XVI, No. 18, September 29, 1939. - Prado Dam, Outlet Works, Santa Ana River near junction of State Highways 71 & 91, Corona, Riverside County, CA

  20. 78 FR 17099 - Safety Zone, Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-20

    ... associated with the U.S. Army Corps of Engineers Electromagnetic Fields evaluation operations. During any of... has determined that the U.S. Army Corps of Engineers Electromagnetic Fields evaluation operation poses...

  1. 32 CFR 644.2 - General.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and harbor purposes. These include the construction, operation, maintenance and improvement of both... United States, all lands, easements and rights-of-way required for initial construction, operation and...-1), authorizes the acquisition of land and interests therein for dam and reservoir projects, channel...

  2. 32 CFR 644.2 - General.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... and harbor purposes. These include the construction, operation, maintenance and improvement of both... United States, all lands, easements and rights-of-way required for initial construction, operation and...-1), authorizes the acquisition of land and interests therein for dam and reservoir projects, channel...

  3. Monitoring and Evaluation of Yearling Fall Chinook Salmon Released from Acclimation Facilities Upstream of Lower Granite Dam; 1998 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rocklage, Stephen J.

    The Nez Perce Tribe, in cooperation with the U.S. Fish and Wildlife Service and Washington Department of Fish and Wildlife, conducted monitoring and evaluation studies on Lyons Ferry Hatchery (Snake River stock) yearling fall chinook salmon that were acclimated and released at three Fall Chinook Acclimation Project sites upstream of Lower Granite Dam along with yearlings released on-station from Lyons Ferry Hatchery in 1998. The three fall chinook acclimation facilities are operated by the Nez Perce Tribe and located at Pittsburg Landing and Captain John Rapids on the Snake River and at Big Canyon Creek on the Clearwater River. Yearlingsmore » at the Big Canyon facility consisted of two size classes that are referred to in this report as 9.5 fish per pound (fpp) and 30 fpp. The Big Canyon 9.5 fpp were comparable to the yearlings at Pittsburg Landing, Captain John Rapids and Lyons Ferry Hatchery. A total of 9,942 yearlings were PIT tagged and released at Pittsburg Landing. PIT tagged yearlings had a mean fork length of 159.9 mm and mean condition factor of 1.19. Of the 9,942 PIT tagged fish released, a total of 6,836 unique tags were detected at mainstem Snake and Columbia River dams (Lower Granite, Little Goose, Lower Monumental and McNary). A total of 4,926 9.5 fpp and 2,532 30 fpp yearlings were PIT tagged and released at Big Canyon. PIT tagged 9.5 fpp yearlings had a mean fork length of 156.9 mm and mean condition factor of 1.13. PIT tagged 30 fpp yearlings had a mean fork length of 113.1 mm and mean condition factor of 1.18. Of the 4,926 PIT tagged 9.5 fpp yearlings released, a total of 3,042 unique tags were detected at mainstem Snake and Columbia River dams. Of the 2,532 PIT tagged 30 fpp yearlings released, a total of 1,130 unique tags were detected at mainstem Snake and Columbia River dams. A total of 1,253 yearlings were PIT tagged and released at Captain John Rapids. PIT tagged yearlings had a mean fork length of 147.5 mm and mean condition factor of 1.09. Of the 1,253 PIT tagged fish released, a total of 719 unique tags were detected at mainstem Snake and Columbia River dams. A total of 2,420 yearlings were PIT tagged and released at Lyons Ferry Hatchery. PIT tagged yearlings had a mean fork length of 159.0 mm and mean condition factor of 1.10. Of the 2,420 PIT tagged fish released, a total of 979 unique tags were detected at mainstem Snake and Columbia River dams (Lower Monumental and McNary). Median travel times, based on all detections, of PIT tagged fish released from Pittsburg Landing were 10.5 days to Lower Granite Dam, 21.7 days to McNary Dam and 29.8 days to Bonneville Dam. Median migration rates were 16.4 rkm/d to Lower Granite Dam, 18.3 rkm/d to McNary Dam and 18.9 rkm/d to Bonneville Dam. The median arrival dates were April 25 at Lower Granite Dam, May 6 at McNary Dam and May 14 at Bonneville Dam. The 90% passage dates were May 5 at Lower Granite Dam, May 20 at McNary Dam and May 25 at Bonneville Dam. Median travel times, based on all detections, of PIT tagged 9.5 fpp yearlings released from Big Canyon were 13.3 days to Lower Granite Dam, 26.0 days to McNary Dam and 30.8 days to Bonneville Dam. Median migration rates were 13.0 rkm/d to Lower Granite Dam, 15.3 rkm/d to McNary Dam and 18.3 rkm/d to Bonneville Dam. The median arrival dates were April 27 at Lower Granite Dam, May 11 at McNary Dam and May 15 at Bonneville Dam. The 90% passage dates were May 9 at Lower Granite Dam, May 24 at McNary Dam and May 25 at Bonneville Dam. Median travel times, based on all detections, of PIT tagged 30 fpp yearlings released from Big Canyon were 20.8 days to Lower Granite Dam, 37.6 days to McNary Dam and 43.5 days to Bonneville Dam. Median migration rates were 8.3 rkm/d to Lower Granite Dam, 10.6 rkm/d to McNary Dam and 12.9 rkm/d to Bonneville Dam. The median arrival dates were May 5 at Lower Granite Dam, May 23 at McNary Dam and May 28 at Bonneville Dam. The 90% passage dates were May 22 at Lower Granite Dam, May 31 at McNary Dam and June 5 at Bonneville Dam. Median arrival dates, based on all detections, of PIT tagged yearlings released from Captain John Rapids were April 26 at Lower Granite Dam, May 8 at McNary Dam and May 14 at Bonneville Dam. The 90% passage dates were May 8 at Lower Granite Dam, May 23 at McNary Dam and May 26 at Bonneville Dam. Median travel times, based on all detections, of PIT tagged fish released from Lyons Ferry Hatchery were 16.9 days to Lower Monumental Dam, 20.9 days to McNary Dam and 30.3 days to Bonneville Dam. Median migration rates were 1.7 rkm/d to Lower Monumental Dam, 7.0 rkm/d to McNary Dam and 12.6 rkm/d to Bonneville Dam. The median arrival dates were April 27 at Lower Monumental Dam, May 1 at McNary Dam and May 8 at Bonneville Dam. The 90% passage dates were May 13 at Lower Monumental Dam, May 16 at McNary Dam and May 24 at Bonneville Dam.« less

  4. National Dam Safety Program. Welch Lake Dam (MO 10733), Missouri - Kansas City Basin, Boone County, Missouri. Phase I Inspection Report.

    DTIC Science & Technology

    1981-03-01

    Operating Facilities 10 4.4 Description of Any Warning System in Effect 10 4.5 Evaluation 10 SECTION 5 - HIDRAULIC /HYDROLOGIC 5.1 Evaluation of Features 11...Hm + 1/4L Y) A = 1/2 T (2d -A Y)c Q = (A 3 g/T) 0 .5 where: d = critical depth (feet) H c = available specific energy which is taken to be the heightm

  5. 33 CFR 208.11 - Regulations for use of storage allocated for flood control or navigation and/or project operation...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Lk KS Mitchel Solomon R FIM 722.3204.8 1488.31455.6 1455.61428.0 3368212602 126023341 PL 78-534PL 79....34051.0 137309410 9410820 PL 78-534 USBR. Kirwin Dam & Res KS Phillips N Fork Solomon R FICR 215.189.6... 1330 890 PL 78-534 VT Webster Dam & Res KS Rocks S Fork Solomon R FIRC 183.472.1 1923.71892.5 1892...

  6. 33 CFR 208.11 - Regulations for use of storage allocated for flood control or navigation and/or project operation...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Lk KS Mitchel Solomon R FIM 722.3204.8 1488.31455.6 1455.61428.0 3368212602 126023341 PL 78-534PL 79....34051.0 137309410 9410820 PL 78-534 USBR. Kirwin Dam & Res KS Phillips N Fork Solomon R FICR 215.189.6... 1330 890 PL 78-534 VT Webster Dam & Res KS Rocks S Fork Solomon R FIRC 183.472.1 1923.71892.5 1892...

  7. 33 CFR 208.11 - Regulations for use of storage allocated for flood control or navigation and/or project operation...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Lk KS Mitchel Solomon R FIM 722.3204.8 1488.31455.6 1455.61428.0 3368212602 126023341 PL 78-534PL 79....34051.0 137309410 9410820 PL 78-534 USBR. Kirwin Dam & Res KS Phillips N Fork Solomon R FICR 215.189.6... 1330 890 PL 78-534 VT Webster Dam & Res KS Rocks S Fork Solomon R FIRC 183.472.1 1923.71892.5 1892...

  8. Locks and Dam 1 (Ford Dam), Mississippi River, Draft Feasibility Report and Environmental Assessment for Hydropower.

    DTIC Science & Technology

    1984-08-01

    Mississippi River. 91 o In the event that the existing licensee, Ford Motor Company , or another non-Federal entity does not apply to FERC for rights to...interests. The existing hydropower plant and equipment are owned and operated by the Ford Motor Company . The existing four turbines generate a combined...Turbines (Ford Motor Company ) 51 Right (West) Abutment 51 Preliminary Screening of Alternatives 51 Conclusions of the Preliminary Comparative Review 53

  9. Hydrological Analysis for Inflow Forecasting into Temengor Dam

    NASA Astrophysics Data System (ADS)

    Najid, MI; Sidek, LM; Hidayah, B.; Roseli, ZA

    2016-03-01

    These days, natural disaster such as flood is the main concern for hydrologists. One of solutions in understanding the reason of flood is by prediction of the event sooner than normal occurrence. One of the criteria is lead time or travel time that is important in the study of fresh waters and flood events. Therefore, estimation of lead or travel time for flood event can be beneficial primary information. The objective of this study is to estimate the lead time or travel time for outlet of Temengor dam in Malaysia. Tenaga Nasional Berhad (TNB) Sungai Perak dam operation has the main contribution on decision support for early water released and flood warning to authorities and locals resident for in the down streams area. For this study, hydrological analysis carried out will help to determine which years that give more rainfall contribution into the reservoir. Rainfall contribution of reservoir help to understanding rainfall distribution and peak discharge on that period. It also help for calibration of forecasting model system for better accuracy of flood hydrograph. There may be various methods to determine the rainfall contribution of catchment. The result has shown that, the rainfall contribution for Temengor catchment, is more on November in each year which is the monsoon season in Malaysia. TNB dam operational decision support systems can prepare and be more aware at this time for flood control and flood mitigation.

  10. Investigating passage of ESA-listed juvenile fall Chinook salmon at Lower Granite Dam during winter when the fish bypass system is not operated

    USGS Publications Warehouse

    Kock, Tobias J.; Tiffan, Kenneth F.; Connor, William P.

    2007-01-01

    During the winter of 2006-07, we radio and passive integrated transponder (PIT) tagged, and released 99 juvenile fall Chinook salmon to evaluate over-wintering behavior and dam passage in the lower Snake River, Washington. All fish were released 10 km upstream of Lower Granite Dam at Granite Point in early November, 2006. Fixed radio telemetry detection sites located in the forebay and tailrace areas of Lower Granite, Little Goose, Lower Monumental, Ice Harbor, Bonneville dams, and at Lyle, Washington were used to monitor fish movements and dam passage through early-May 2007. Of the 99 fish released during our study, 80 passed Lower Granite Dam and were detected at downstream detection sites, 37 passed Little Goose Dam, 41 passed Lower Monumental Dam, 31 passed Ice Harbor Dam, 18 passed Lyle, WA, and 13 passed Bonneville Dam. Of the fish that passed Lower Granite Dam in the fall, 63 fish did so during the extended bypass period from November 1 through December 16. Of these fish, 53 were also detected by the PIT-tag interrogation system. Fifteen of the fish that passed Lower Granite Dam in the fall continued to pass lower Snake River dams and exit the system by the end of January. The remaining fish either died, their tags failed, or they resided in Little Goose Reservoir until spring when relatively few continued their seaward migration. Passage of tagged fish past lower Snake River dams generally declined during the winter as temperatures decreased, but increased again in the spring as temperatures and flows increased. Fish residence times in reservoirs and forebays was lengthy during the winter (up to 160 d), and varied by reservoir and time of year. We observed no diel trends in fish passage. Very few fish were detected at PIT-tag interrogation sites in the spring compared to detection by radio telemetry detection sites indicating that fish may have passed via spill. We believe that passage of overwintering juvenile fall Chinook salmon during winter is due more to chance than directed downstream movement. Since the primary route of passage during the winter is through powerhouse turbines, the potential exists for increased mortality for over-wintering juvenile fall Chinook salmon in the Snake River. Our findings that some fish can pass undetected during the winter likely bias traditional smolt-to-adult return rate calculations that are typically used to measure the success of juvenile transportation studies.

  11. Analysis of the hydrological safety of dams combining two numerical tools: Iber and DualSPHysics

    NASA Astrophysics Data System (ADS)

    González-Cao, J.; García-Feal, O.; Domínguez, J. M.; Crespo, A. J. C.; Gómez-Gesteira, M.

    2018-02-01

    The upgrade of the hydrological safety of dams is a critical issue to avoid failures that can dramatically affect people and assets. This paper shows a numerical methodology to analyse the safety of the Belesar dam (NW, Spain) based on two different numerical codes. First, a mesh-based code named Iber, suited to deal with large 2-D domains, is used to simulate the impoundment. The initial conditions and the inlet provided to Iber correspond to the maximum water elevation and the maximum expected inflow to the impoundment defined in the technical specifications of the dam, which are associated to the more hazardous operation conditions of the dam. Iber provides information about the time needed for water to attain the crest of the dam when floodgates are closed. In addition, it also provides the velocity of discharge when gates are opened. Then, a mesh-free code named DualSPHysics, which is especially suited to deal with complex and violent 3-D flows, is used to reproduce the behaviour of one of the spillways of the dam starting from the results obtained with Iber, which are used as inlet conditions for DualSPHysics. The combined results of both model show that the left spillway can discharge the surplus of water associated to the maximum inflow to the reservoir if the gates of the spillways are opened before the overtopping of the dam was observed. In addition, water depth measured on the spillway is considerably lower than the lateral walls, preventing overtopping. Finally, velocities at different points of the spillway showed to be in good agreement with theoretical values.

  12. A temporal-spatial postprocessing model for probabilistic run-off forecast. With a case study from Ulla-Førre with five catchments and ten lead times

    NASA Astrophysics Data System (ADS)

    Engeland, K.; Steinsland, I.

    2012-04-01

    This work is driven by the needs of next generation short term optimization methodology for hydro power production. Stochastic optimization are about to be introduced; i.e. optimizing when available resources (water) and utility (prices) are uncertain. In this paper we focus on the available resources, i.e. water, where uncertainty mainly comes from uncertainty in future runoff. When optimizing a water system all catchments and several lead times have to be considered simultaneously. Depending on the system of hydropower reservoirs, it might be a set of headwater catchments, a system of upstream /downstream reservoirs where water used from one catchment /dam arrives in a lower catchment maybe days later, or a combination of both. The aim of this paper is therefore to construct a simultaneous probabilistic forecast for several catchments and lead times, i.e. to provide a predictive distribution for the forecasts. Stochastic optimization methods need samples/ensembles of run-off forecasts as input. Hence, it should also be possible to sample from our probabilistic forecast. A post-processing approach is taken, and an error model based on Box- Cox transformation, power transform and a temporal-spatial copula model is used. It accounts for both between catchment and between lead time dependencies. In operational use it is strait forward to sample run-off ensembles from this models that inherits the catchment and lead time dependencies. The methodology is tested and demonstrated in the Ulla-Førre river system, and simultaneous probabilistic forecasts for five catchments and ten lead times are constructed. The methodology has enough flexibility to model operationally important features in this case study such as hetroscadasety, lead-time varying temporal dependency and lead-time varying inter-catchment dependency. Our model is evaluated using CRPS for marginal predictive distributions and energy score for joint predictive distribution. It is tested against deterministic run-off forecast, climatology forecast and a persistent forecast, and is found to be the better probabilistic forecast for lead time grater then two. From an operational point of view the results are interesting as the between catchment dependency gets stronger with longer lead-times.

  13. National Dam Safety Program. Tomhannock Spillway Dam (Inventory Number N.Y. 117), Upper Hudson River Basin, Rensselaer County, New York. Phase I Inspection Report,

    DTIC Science & Technology

    1981-08-01

    and the reservoir spillway located in Schaghticoke. The dam has a drainage area of 67 square miles, which is characterized by wooded and agricultural...e____ Aie A. Lct LcA t .?t*fCL L C A 35.0 * Or L ,l! 5.9,5 34$ . ig lo. 11 vW{ OOA.. I .1W .4OL zA 4 -1Y\\’ 0 4 ~~~~.7 0A’.t4 bQ Q * L’~’c 4 SSTETSON...adktional operating space. The existing wood roof shows evidence of dry rot and should be replaced. In connection with the roof replacement, hoisting

  14. Estimation of pollutant loads considering dam operation in Han River Basin by BASINS/Hydrological Simulation Program-FORTRAN.

    PubMed

    Jung, Kwang-Wook; Yoon, Choon-G; Jang, Jae-Ho; Kong, Dong-Soo

    2008-01-01

    Effective watershed management often demands qualitative and quantitative predictions of the effect of future management activities as arguments for policy makers and administration. The BASINS geographic information system was developed to compute total maximum daily loads, which are helpful to establish hydrological process and water quality modeling system. In this paper the BASINS toolkit HSPF model is applied in 20,271 km(2) large watershed of the Han River Basin is used for applicability of HSPF and BMPs scenarios. For proper evaluation of watershed and stream water quality, comprehensive estimation methods are necessary to assess large amounts of point source and nonpoint-source (NPS) pollution based on the total watershed area. In this study, The Hydrological Simulation Program-FORTRAN (HSPF) was estimated to simulate watershed pollutant loads containing dam operation and applied BMPs scenarios for control NPS pollution. The 8-day monitoring data (about three years) were used in the calibration and verification processes. Model performance was in the range of "very good" and "good" based on percent difference. The water-quality simulation results were encouraging for this large sizable watershed with dam operation practice and mixed land uses; HSPF proved adequate, and its application is recommended to simulate watershed processes and BMPs evaluation. IWA Publishing 2008.

  15. A Markov chain analysis of the movements of juvenile salmonids in the forebay of McNary Dam, Washington and Oregon, 2006-09

    USGS Publications Warehouse

    Adams, Noah S.; Hatton, Tyson W.

    2012-01-01

    Passage and survival data for yearling and subyearling Chinook salmon and juvenile steelhead were collected at McNary Dam between 2006 and 2009. These data have provided critical information for resource managers to implement structural and operational changes designed to improve the survival of juvenile salmonids as they migrate past the dam. Much of the information collected at McNary Dam was in the form of three-dimensional tracks of fish movements in the forebay. These data depicted the behavior of multiple species (in three dimensions) during different diel periods, spill conditions, powerhouse operations, and test configurations of the surface bypass structures (temporary spillway weirs; TSWs). One of the challenges in reporting three-dimensional results is presenting the information in a manner that allows interested parties to summarize the behavior of many fish over many different conditions across multiple years. To accomplish this, we investigated the feasibility of using a Markov chain analysis to characterize fish movement patterns in the forebay of McNary Dam. The Markov chain analysis is one way that can be used to summarize numerically the behavior of fish in the forebay. Numerically summarizing the behavior of juvenile salmonids in the forebay of McNary Dam using the Markov chain analysis allowed us to confirm what had been previously summarized using visualization software. For example, proportions of yearling and subyearling Chinook salmon passing the three powerhouse areas was often greater in the southern and middle areas, compared to the northern area. The opposite generally was observed for steelhead. Results of this analysis also allowed us to confirm and quantify the extent of milling behavior that had been observed for steelhead. For fish that were first detected in the powerhouse region, less than 0.10 of the steelhead, on average, passed within each of the powerhouse areas. Instead, steelhead transitioned to adjoining areas in the spillway before passing the dam. In comparison, greater than 0.20 of the Chinook salmon passed within the powerhouse areas. Less milling behavior was observed for all species for fish that first approached the spillway. Compared to the powerhouse areas, a higher proportion of fish, regardless of species, passed the spillway areas and fewer transitioned to adjoining areas in the powerhouse. In addition to quantifying what had been previously speculated about the behavior of fish in the forebay of McNary Dam, the Markov chain analysis refined our understanding of how fish behavior and passage can be influenced by changes to the operations and structure of McNary Dam. For example, the addition of TSWs to the spillway area clearly influenced the passage of fish. Previous results have been reported showing that TSWs increased the number of fish passing through non-turbine routes and the fish-track videos indicated, in general, how fish behaved before passing through the TSWs. However, the analysis presented in this report allowed us to better understand how fish moved across the face of the dam before passing the TSWs and provided a way to quantify the effect of TSW location. Installation of the TSWs in bays 22 and 20 clearly increased passage proportions through the southern one-third of the spillway area for all species, most significantly for steelhead. When the TSWs were moved to bays 19 and 20 in 2008, overall passage through the southern one-third of the spillway remained higher than 2006, but decreased from what was observed in 2007. Shifting the TSWs to the north decreased the proportion of fish passing through the TSWs and increased the number of fish that moved to adjoining areas before passing the dam. Perhaps the most interesting new information to come out of the two-step Markov chain analysis relates to how the performance of the TSWs was influenced by their proximity to the powerhouse. During 2007, the highest proportion of fish passing through TSW22 was for fish that transitioned from the powerhouse area. In contrast, a relatively low proportion of fish passed through TSW20 after coming from the powerhouse area. Instead, the proportion of fish that passed TSW20 after coming from the northern part of the spillway was twice as high as the proportion of fish that passed through TSW20 after coming from the powerhouse. During 2008, the TSW in bay 22 was moved to bay 19, leaving the TSW in bay 20 as the one closest to the powerhouse. As was the case when a TSW was located in bay 22; the proportion of fish passing TSW20 after coming from the powerhouse was greater than the proportion of fish passing through TSW20 after coming from the northern part of the spillway. Passage proportions for fish passing through TSW19, the farthest north of the two TSWs during 2008, was higher for fish that came from the northern part of the spillway compared to the proportion of fish that passed through TSW19 after coming from the powerhouse. The Markov chain analysis provided a mathematical way to characterize fish behavior in the forebay of McNary Dam and helped refine our understanding of how fish movements were influenced by operational and structural changes at McNary Dam. The Markov chain analysis also could be used to examine how future structural and operational changes proposed for McNary Dam might influence the passage of juvenile salmonids.

  16. The Glen Canyon Dam adaptive management program: progress and immediate challenges

    USGS Publications Warehouse

    Hamill, John F.; Melis, Theodore S.; Boon, Philip J.; Raven, Paul J.

    2012-01-01

    Adaptive management emerged as an important resource management strategy for major river systems in the United States (US) in the early 1990s. The Glen Canyon Dam Adaptive Management Program (‘the Program’) was formally established in 1997 to fulfill a statutory requirement in the 1992 Grand Canyon Protection Act (GCPA). The GCPA aimed to improve natural resource conditions in the Colorado River corridor in the Glen Canyon National Recreation Area and Grand Canyon National Park, Arizona that were affected by the Glen Canyon dam. The Program achieves this by using science and a variety of stakeholder perspectives to inform decisions about dam operations. Since the Program started the ecosystem is now much better understood and several biological and physical improvements have been achieved. These improvements include: (i) an estimated 50% increase in the adult population of endangered humpback chub (Gila cypha) between 2001 and 2008, following previous decline; (ii) a 90% decrease in non-native rainbow trout (Oncorhynchus mykiss), which are known to compete with and prey on native fish, as a result of removal experiments; and (iii) the widespread reappearance of sandbars in response to an experimental high-flow release of dam water in March 2008.Although substantial progress has been made, the Program faces several immediate challenges. These include: (i) defining specific, measurable objectives and desired future conditions for important natural, cultural and recreational attributes to inform science and management decisions; (ii) implementing structural and operational changes to improve collaboration among stakeholders; (iii) establishing a long-term experimental programme and management plan; and (iv) securing long-term funding for monitoring programmes to assess ecosystem and other responses to management actions. Addressing these challenges and building on recent progress will require strong and consistent leadership from the US Department of the Interior officials who guide the Program.

  17. Storage capacity and sedimentation trends of Lago Garzas, Puerto Rico, 1996-2007

    USGS Publications Warehouse

    Soler-Lopez, L.R.

    2012-01-01

    Lago Garzas is located in west-central Puerto Rico, about 3.5 kilometers southwest of the town of Adjuntas, in the confluence of the Río Vacas and three other unnamed tributaries (fig. 1). The dam is owned and operated by the Puerto Rico Electric Power Authority (PREPA), and was constructed in 1943 for hydroelectric power generation and municipal water use along the southern coast. The dam is a semi-hydraulic earthfill embankment lined with boulders, and has a height of 61.57 meters, a top width of 9.14 meters, a base width of 365.76 meters, and a crest length of 227.37 meters; State Road PR-518 crosses the top of the dam. A morning-glory-type spillway is located near the west abutment of the dam at an elevation of 736.12 meters above mean sea level (Puerto Rico Water Resources Authority, 1969). Figure 2 shows an aerial photograph of the Lago Garzas earthfill dam and the morning-glory spillway section. Additional information and operational procedures are provided in Soler-López and others (1999). During July 17-18, 2007, the U.S. Geological Survey (USGS) Caribbean Water Science Center, in cooperation with the Puerto Rico Aqueduct and Sewer Authority, conducted a bathymetric survey of Lago Garzas to update the reservoir storage capacity and update the reservoir sedimentation rate by comparing the 2007 data with the previous 1996 bathymetric survey results. The purpose of this report is to describe and document the USGS sedimentation survey conducted at Lago Garzas during July 2007, including the methods used to update the reservoir storage capacity, sedimentation rates, and areas of substantial sediment accumulation since 1996.

  18. Design of adaptation actions to compensate the hydrological impact of the river regulation by dams on the Ebro Delta (Spain): combining modeling and field work.

    NASA Astrophysics Data System (ADS)

    Contreras, Darío; Jurado, Alicia; Carpintero, Miriam; Rovira, Albert; Polo, María J.

    2016-04-01

    River regulation by dams for both flood control and water storage has allowed to decrease both uncertainty and risks associated to extreme hydrological events. However, the alteration of the natural river flow regime and the detraction of high water volumes usually lead to significant effects downstream on the morphology, water quality, ecological status of water… and this is particularly relevant in the transitional waters since the sea level rise poses an additional threat on such conditions. The Ebro River, in northeastern Spain, is one of the highly regulated rivers in Spain with the dams located in the mainstream. Besides an estimated decrease of a 30% of the freshwater inputs, the sediment delivery to the final delta in the Mediterranean has dramatically been decreased up to a 99%, with environmental risks associated to the reduction of the emerged areas from the loss of sediment supply, the impact on the subsidence dynamics, and the sea level rise. The Ebro Delta suffers a mean regression of 10 m per year, and the persistence of macrophyte development in the final reach of the river due to the low water mean flow regime. The project LIFE EBRO-ADMICLIM (ENV/ES/001182), coordinated by the IRTA in Catalonia (Spain), puts forwards pilot actions for adaptation to and mitigation of climate change in the Ebro Delta. An integrated approach is proposed for managing water, sediment and habitats (rice fields and wetlands), with the multiple aim of optimizing ground elevation, reducing coastal erosion, increasing the accumulation (sequestration) of carbon in the soil, reducing emissions of greenhouse gases (GHG), and improving water quality. This work presents the pilot actions included in the project to mitigate the loss of water flow and sediment supply to the delta. Sediment injections at different points upstream have been designed to calibrate and validate a sediment transport model coupled to a 2D-hydrodinamic model of the river. The combination of an a-priori approach theoretical modeling with the pilot field actions leads to an efficient design of these injections, an estimation of their efficiency, the calibration of the flow and sediment transport model for the simulation of different options of regular recirculation of sediments from the dams' tails, and the identification of thresholds for their operationality. The use of physical approaches for modeling the hydrological impacts of dam regulation provides an efficient tool for the design of field work and potential adaption actions.

  19. Optimizing multiple reliable forward contracts for reservoir allocation using multitime scale streamflow forecasts

    NASA Astrophysics Data System (ADS)

    Lu, Mengqian; Lall, Upmanu; Robertson, Andrew W.; Cook, Edward

    2017-03-01

    Streamflow forecasts at multiple time scales provide a new opportunity for reservoir management to address competing objectives. Market instruments such as forward contracts with specified reliability are considered as a tool that may help address the perceived risk associated with the use of such forecasts in lieu of traditional operation and allocation strategies. A water allocation process that enables multiple contracts for water supply and hydropower production with different durations, while maintaining a prescribed level of flood risk reduction, is presented. The allocation process is supported by an optimization model that considers multitime scale ensemble forecasts of monthly streamflow and flood volume over the upcoming season and year, the desired reliability and pricing of proposed contracts for hydropower and water supply. It solves for the size of contracts at each reliability level that can be allocated for each future period, while meeting target end of period reservoir storage with a prescribed reliability. The contracts may be insurable, given that their reliability is verified through retrospective modeling. The process can allow reservoir operators to overcome their concerns as to the appropriate skill of probabilistic forecasts, while providing water users with short-term and long-term guarantees as to how much water or energy they may be allocated. An application of the optimization model to the Bhakra Dam, India, provides an illustration of the process. The issues of forecast skill and contract performance are examined. A field engagement of the idea is useful to develop a real-world perspective and needs a suitable institutional environment.

  20. Lake Billy Shaw Operations and Maintenance, Final Annual Report 2000.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dodson, Guy; Pero, Vincent

    Lake Billy Shaw is a newly constructed earthen dam reservoir with a surface area of 430 acres. Construction on the dam and structures was complete in November of 1998. The fish screen structures were complete in December of 1998, with initial filling in May 1999. Upon initial filling, dam structures, monitoring wells, fish screen structures, and lake level were monitored daily, with recordings being taken three times/week. During June 1999 the water to the lake was turned off in order to complete additional construction work on the lake. This work included installation of culverts around the perimeter road, installation ofmore » boat launches, finish work on the spillway structure, pumphouse and well protection and planting 4 trees along the entrance to the boat launch area. The water was turned on again in late September 1999 with all structures having been checked, fish screens greased and maintained and well levels being monitored. In 2000 the Operations and Maintenance portion of the project began with monitoring of piezometers, water levels, biological monitoring, riparian plantings, protection of shorelines, and maintenance of structures and appurtances.« less

  1. Managing Tradeoffs between Hydropower and the Environment in the Mekong River Basin

    NASA Astrophysics Data System (ADS)

    Loucks, Daniel P.; Wild, Thomas B.

    2015-04-01

    Hydropower dams are being designed and constructed at a rapid pace in the Mekong/Lancang River basin in Southeast Asia. These reservoirs are expected to trap significant amounts sediment, decreasing much of the river's capability to transport nutrients and maintain its geomorphology and habitats. We apply a simulation model for identifying and evaluating alternative dam siting, design and operating policy (SDO) options that could help maintain more natural sediment regimes downstream of dams and for evaluating the effect of these sediment-focused SDO strategies on hydropower production and reliability. We apply this approach to the planned reservoirs that would prevent a significant source of sediment from reaching critical Mekong ecosystems such as Cambodia's Tonle Sap Lake and the Mekong delta in Vietnam. Model results suggest that various SDO modifications could increase sediment discharge from this site by 300-450% compared to current plans, but a 30-55% loss in short-term annual energy production depending on various configurations of upstream reservoirs. Simulation results also suggest that sediment management-focused reservoir operating policies could cause ecological damage if they are not properly implemented.

  2. Design and Operation of a Calorimeter for Advanced Multilayer Insulation Testing

    NASA Technical Reports Server (NTRS)

    Chato, David J.; Johnson, Wesley L.; Van Dresar, Neil

    2016-01-01

    A calorimeter has been constructed to accurately measure insulation performance with a nominal 90K outer boundary and a 20K inner boundary. Unique features of this design include use of mechanical cryocoolers instead of cryogens and measurement of the heat load with a calibrated heat conduction rod. The calorimeter is operational and has completed its first test series. The initial test series was designed to look for differences in performance between a single layer of aluminum foil and a sheet of double aluminized Mylar (DAM). Although it has been speculated that the aluminum foil would perform better, since the aluminum coating on the Mylar might not be thick enough to stop the transmission of long wave length infrared radiation, our testing showed a higher heat load for the aluminum foil than the DAM. The aluminum foil showed a heat load of 132 mW at an 87 K outer temperature and 152 mW at a 107K outer temperature, whereas the DAM showed a heat load of 66 mW at an 88 K outer temperature and 81 mW at 108 K.

  3. Design and Operation of a Calorimeter for Advanced Multilayer Insulation Testing

    NASA Technical Reports Server (NTRS)

    Chato, David; Johnson, Wesley; Dresar, Neil Van

    2016-01-01

    A calorimeter has been constructed to accurately measure insulation performance with a nominal 90K cold outer boundary and a 20K inner boundary. Unique features of this design include use of mechanical cryocoolers instead cryogens and measurement of the heat load with a calibrated rod to serve as a conduction path. The calorimeter is operational and has completed its first test series. The initial test series was designed to look for differences in performance between a single layer of aluminum foil and a sheet of double aluminized mylar (DAM). Although it has been speculated that the aluminum foil would perform better, since the mylar coating might not thick enough to stop the transmission of long wave length infrared radiation, our testing showed a higher heat load for the aluminum foil than the DAM. The aluminum foil showed a heat load of 132 mW at an 87 K outer temperature and 152 mW at a 107K outer temperature. Whereas the DAM showed a heat load of 66 mW at an 88 K outer temperature and 81 mW at 108 K.

  4. Operating manual for the digital data-collection system for flow-control structures

    USGS Publications Warehouse

    Rorabaugh, J.I.; Rapp, W.L.

    1986-01-01

    This manual was written to help the user operate and maintain the digital data collection system for flow control structures. The system is used to measure daily discharge through river control dams. These dams commonly have tainter gates which are raised and lowered to keep the upper pool level relatively constant as the river flow changes. In order to measure the flow through such a structure, the positions of the tainter gates and the headwater and tailwater elevations must be known. From these data, the flow through the structure can be calculated. A typical digital data collection system is shown. Digitizing devices are mounted on the hoisting mechanism of each gate, as well as at the headwater and tailwater gages. Data from these digitizers are then routed by electrical cables to a central console where they are displayed and recorded on paper tape. If the dam has locks, a pressure-sensitive switch located in the lock activates a counter in the console which keeps track of the number of times the lock is drained and filled. (USGS)

  5. Dams and Levees: Safety Risks

    NASA Astrophysics Data System (ADS)

    Carter, N. T.

    2017-12-01

    The nation's flood risk is increasing. The condition of U.S. dams and levees contributes to that risk. Dams and levee owners are responsible for the safety, maintenance, and rehabilitation of their facilities. Dams-Of the more than 90,000 dams in the United States, about 4% are federally owned and operated; 96% are owned by state and local governments, public utilities, or private companies. States regulate dams that are not federally owned. The number of high-hazard dams (i.e., dams whose failure would likely result in the loss of human life) has increased in the past decade. Roughly 1,780 state-regulated, high-hazard facilities with structural ratings of poor or unsatisfactory need rehabilitation. Levees-There are approximately 100,000 miles of levees in the nation; most levees are owned and maintained by municipalities and agricultural districts. Few states have levee safety programs. The U.S. Army Corps of Engineers (Corps) inspects 15,000 miles of levees, including levees that it owns and local levees participating in a federal program to assist with certain post-flood repairs. Information is limited on how regularly other levees are inspected. The consequence of a breach or failure is another aspect of risk. State and local governments have significant authority over land use and development, which can shape the social and economic impacts of a breach or failure; they also lead on emergency planning and related outreach. To date, federal dam and levee safety efforts have consisted primarily of (1) support for state dam safety standards and programs, (2) investments at federally owned dams and levees, and (3) since 2007, creation of a national levee database and enhanced efforts and procedures for Corps levee inspections and assessments. In Public Law 113-121, enacted in 2014, Congress (1) directed the Corps to develop voluntary guidelines for levee safety and an associated hazard potential classification system for levees, and (2) authorized support for the development of state levee safety programs. As of 2017, federal funding for work pursuant to these provisions has been limited. Key policy considerations include (1) whether the status quo regarding investment and responsibilities in dam and levee safety results in a tolerable level of risk nationally and locally, and (2) who bears those risks.

  6. Perchlorate as a Ground-Water Tracer Along the Lower Colorado River

    NASA Astrophysics Data System (ADS)

    Justet, L.; Lico, M. S.

    2008-12-01

    Anthropogenic perchlorate was first observed in the lower Colorado River (NV and AZ) in 1997. The perchlorate source was traced upstream from Hoover Dam and Lake Mead to Las Vegas Wash. Perchlorate migrated through the local surface- and ground-water systems to the Wash from nearby manufacturing facilities in Henderson, NV, which had been operating since the 1940s. The Nevada Division of Environmental Protection (NDEP) began monitoring perchlorate in the lower Colorado River at Willow Beach, located about 18 km south of the Dam, in 1997. A 3 μg/L reduction was observed at Willow Beach in 2003-2004, coincident with remediation at the Henderson site in 1999-2004. This observed decrease indicates that the effects of remediation rapidly propagated through the surface-water system below the Dam. In July 2008 water samples were collected and analyzed for perchlorate from eight springs along the lower Colorado River below Hoover Dam, from a discharge tunnel in the country rock at Hoover Dam, and from Lake Mead (above and below the thermocline). Lake Mead water collected above the thermocline east of Sentinel Island contained 3.9 μg/L perchlorate, while water below the thermocline contained 1.8 μg/L. Perchlorate concentrations were lower than the 2 to 4 μg/L quantitation limit for the six springs located more than 2 km south of the Dam. Samples from Pupfish Springs, about 0.9 km south of the Dam, contained 6.4-6.8 μg/L perchlorate. Water collected from the discharge tunnel in the Dam contained 8.2 μg/L perchlorate. Perchlorate concentrations observed at Pupfish Springs and the discharge tunnel in the Dam in 2008 are similar to those reported downstream at Willow Beach prior to 2003-2004 by NDEP indicating that the ground water travel time from the Dam to Pupfish Springs is between 4 and 70 years and the maximum flow velocities are between about 13-200 m/y. These rapid velocity estimates suggest that faults and fractures in the area are an important control on discharge points in the vicinity of the Dam. The presence of perchlorate at two sites and absence or background concentrations at the other sites indicates the presence of multiple flow paths between the perchlorate source and the springs near the Dam or that the flow paths are more complex than previously thought.

  7. Conditions and processes affecting sand resources at archeological sites in the Colorado River corridor below Glen Canyon Dam, Arizona

    USGS Publications Warehouse

    East, Amy E.; Collins, Brian D.; Sankey, Joel B.; Corbett, Skye C.; Fairley, Helen C.; Caster, Joshua J.

    2016-05-17

    We conclude that most of the river-corridor archeological sites are at elevated risk of net erosion under present dam operations. In the present flow regime, controlled floods do not simulate the magnitude or frequency of natural floods, and are not large enough to deposit sand at elevations that were flooded at annual to decadal intervals in predam time. For archeological sites that depend upon river-derived sand, we infer elevated erosion risk owing to a combination of reduced sand supply (both fluvial and aeolian) through (1) the lower-than-natural flood magnitude, frequency, and sediment supply of the controlled-flooding protocol; (2) reduction of open, dry sand area available for wind redistribution under current normal (nonflood) dam operations, which do not include flows as low as natural seasonal low flows and do include substantial daily flow fluctuations; and (3) impeded aeolian sand entrainment and transport owing to increased riparian vegetation growth in the absence of larger, more-frequent floods. If dam operations were to increase the supply of sand available for windblown transport—for example, through larger floods, sediment augmentation, or increased fluvial sandbar exposure by low flows—and also decrease riparian vegetation, the prevalence of active aeolian sand could increase over time, and the propensity for unmitigated gully erosion could decrease. Although the evolution of river-corridor landscapes and archeological sites has been altered fundamentally by the lack of large, sediment-rich floods (flows on the order of 5,000 m3/s), some combination of sediment-rich flows above 1,270 m3/s, seasonal flows below 226 m3/s, and riparian-vegetation removal might increase the preservation potential for sand-dependent archeological resources in the Colorado River corridor.

  8. Annotated bibliography for the humpback chub (Gila cypha) with emphasis on the Grand Canyon population.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goulet, C. T.; LaGory, K. E.; Environmental Science Division

    2009-10-05

    Glen Canyon Dam is a hydroelectric facility located on the Colorado River in Arizona that is operated by the U.S. Bureau of Reclamation (Reclamation) for multiple purposes including water storage, flood control, power generation, recreation, and enhancement of fish and wildlife. Glen Canyon Dam operations have been managed for the last several years to improve conditions for the humpback chub (Gila cypha) and other ecosystem components. An extensive amount of literature has been produced on the humpback chub. We developed this annotated bibliography to assist managers and researchers in the Grand Canyon as they perform assessments, refine management strategies, andmore » develop new studies to examine the factors affecting humpback chub. The U.S. Geological Survey recently created a multispecies bibliography (including references on the humpback chub) entitled Bibliography of Native Colorado River Big Fishes (available at www.fort.usgs.gov/Products/data/COFishBib). That bibliography, while quite extensive and broader in scope than ours, is not annotated, and, therefore, does not provide any of the information in the original literature. In developing this annotated bibliography, we have attempted to assemble abstracts from relevant published literature. We present here abstracts taken unmodified from individual reports and articles except where noted. The bibliography spans references from 1976 to 2009 and is organized in five broad topical areas, including: (1) biology, (2) ecology, (3) impacts of dam operations, (4) other impacts, and (5) conservation and management, and includes twenty subcategories. Within each subcategory, we present abstracts alphabetically by author and chronologically by year. We present relevant articles not specific to either the humpback chub or Glen Canyon Dam, but cited in other included reports, under the Supporting Articles subcategory. We provide all citations in alphabetical order in Section 7.« less

  9. The necessity of field research in prescription of Environmental Flows - A case of the hydropower dominated Middle Zambezi Catchment

    NASA Astrophysics Data System (ADS)

    Mwelwa, Elenestina; Crosato, Alessandra; Wright, Nigel; Beevers, Lindsay

    2013-04-01

    The research work in the Middle Zambezi sub-catchment has the key objective to investigate the state of the river and its flood plain in terms of flow variation, river and flood plain morphological variation for both the pre and post hydropower schemes. From the rich biodiversity that this area supports, both Zambia and Zimbabwe has established National Parks with Mana Pools National Park, Sapi and Chewore safari areas being designated as UNESCO World Heritage Site in 1984. The habitat sustenance depend on the river channels and the associated morphological features with the flood and recession interaction whose modification can lead to negative environmental consequences. The research findings on the state of the sub-catchment flows and morphology will be outlined. Highlights will be given on the following findings: dominance of hydropower regulation in the water balance of the river reach, historical map analysis and related rates of river channel morphology changes associated to dam operating events and, bed load sediment characterisation and distribution. With the use of SOBEK-Rural (1D/2D) model, analysis of future state of the sub-catchment will be outlined, taking into account the following scenarios: no dam state of the river reach; continue with current water regulation and operations; modification in water regulation to take into account favorable changes and; climate related variation of droughts. The research deductions and implications for maintaining the current dam operation practices will be outline as relates to the sustainability of the hydro-morphology and ecosystem of the catchment which support a rich wildlife habitat. The research observed critical water needs form the basis for environmental flows prescription and recommendation. Whereas the restoration of regular flooding has been identified to be important, the most critical need however is the timing of flood gate regulation which has been observed as a trigger to loss of islands and bars due to channel bank slumps. This phenomenon could only be observed and monitored during field research. In addition the water needs and vitality of the biological indicator - Faidherbiah Albida tree has been identified as being critical to sustenance of the habitat. The understanding gained from the research output can feed into decision making frameworks for the water resources managers in charge of the hydropower dam operation in order to consider modifications to the current dam operating rules and water allocation for environmental flows.

  10. Influence of El Niño Southern Oscillation on global hydropower production

    NASA Astrophysics Data System (ADS)

    Ng, Jia Yi; Turner, Sean W. D.; Galelli, Stefano

    2017-03-01

    El Niño Southern Oscillation (ENSO) strongly influences the global climate system, affecting hydrology in many of the world’s river basins. This raises the prospect of ENSO-driven variability in global and regional hydroelectric power generation. Here we study these effects by generating time series of power production for 1593 hydropower dams, which collectively represent more than half of the world’s existing installed hydropower capacity. The time series are generated by forcing a detailed dam model with monthly-resolution, 20th century inflows—the model includes plant specifications, storage dynamics and realistic operating schemes, and runs irrespectively of the dam construction year. More than one third of simulated dams exhibit statistically significant annual energy production anomalies in at least one of the two ENSO phases of El Niño and La Niña. For most dams, the variability of relative anomalies in power production tends to be less than that of the forcing inflows—a consequence of dam design specifications, namely maximum turbine release rate and reservoir storage, which allows inflows to accumulate for power generation in subsequent dry years. Production is affected most prominently in Northwest United States, South America, Central America, the Iberian Peninsula, Southeast Asia and Southeast Australia. When aggregated globally, positive and negative energy production anomalies effectively cancel each other out, resulting in a weak and statistically insignificant net global anomaly for both ENSO phases.

  11. Channel evolution under changing hydrological regimes in anabranching reaches downstream of the Three Gorges Dam

    NASA Astrophysics Data System (ADS)

    Han, Jianqiao; Zhang, Wei; Yuan, Jing; Fan, Yongyang

    2018-03-01

    Elucidating the influence of dams on fluvial processes can benefit river protection and basin management. Based on hydrological and topographical data, we analyzed channel evolution in anabranching reaches under changing hydrological regimes influenced by the Three Gorges Dam. The main conclusions are as follows: 1) the channels of specific anabranching reaches were defined as flood trend channels or low-flow trend channels according to the distribution of their flow characteristics. The anabranching reaches were classified as T1 or T2. The former is characterized by the correspondence between the flood trend and branch channels, and the latter is characterized by the correspondence between the flood trend and main channels; 2) on the basis of the new classification, the discrepant patterns of channel evolution seen in anabranching reaches were unified into a pattern that showed flood trend channels shrinking and low-flow trend channels expanding; 3) flood abatement and the increased duration of moderate flow discharges are the main factors that affect channel adjustments in anabranching reaches after dam construction; and 4) in the next few decades, the pattern of channel evolution will remain the same as that of the Three Gorges Dam operation. That is, the morphology will fully adapt to a flow with a low coefficient of variation. Our results are of interest in the management of the Yangtze River and other rivers influenced by dams.

  12. Increasing drought risk in large-dam basins of South Korea

    NASA Astrophysics Data System (ADS)

    Jung, I. W.; Shin, Y.; Park, J.; Kim, D.

    2017-12-01

    In 2015, South Korea suffered one of the worst droughts in recent years. Seoul and Gyeonggi and Gangwon provinces experienced severe drought conditions, receiving less than 43 percent of the annual precipitation average of the past 30 years. Additionally, the 2015 summer precipitation was less than half of the average. The lack of summer precipitation induced serious shortages in dam storages, which are important supplies for the dry season. K-water, a public company managing South Korea's public water supply system, is fighting to secure public water supply and minimize potential damage that may occur before the subsequent wet season. This study detected significant decreasing trends (95% confidence interval) in dry-seasonal runoff rates (=dam inflow / precipitation) in three dams basins (Soyang, Chungju, and Andong). Changes in potential evapotranspiration (PET) and precipitation indices were examined to investigate potential causes of decreasing runoff rates trends. However, there were no clear relations among changes in runoff rates, PET, and precipitation indices. Runoff rate reduction in the three dams may increase the risk of dam operational management and long-term water resource planning. Therefore, it will be necessary to perform a multilateral analysis to better understand decreasing runoff rates.AcknowledgementsThis research was supported by a grant(2017-MPSS31-001) from Supporting Technology Development Program for Disaster Management funded by Ministry of Public Safety and Security(MPSS) of the Korean government.

  13. Hydro-dam - A nature-based solution or an ecological problem: The fate of the Tonlé Sap Lake.

    PubMed

    Lin, Zihan; Qi, Jiaguo

    2017-10-01

    Recent proliferation of hydro-dams was one of the nature-based solutions to meet the increasing demand for energy and food in the Lower Mekong River Basin (LMRB). While construction of these hydro-dams generated some hydropower and facilitated expansion of irrigated lands, it also significantly altered the basin-wide hydrology and subsequently impacted wetland ecosystems. Unintended adverse consequences of ecosystem services from lakes and wetlands offset the intended gains in hydroelectricity and irrigated agriculture. The trade-offs between gains in energy and food production and losses in aquatic ecosystem services were perceived to be significant but knowledge of the magnitude, spatial extent, and type of ecosystem services change is lacking and, therefore, the question whether the hydro-dam is an optimized solution or a potential ecological problem remains unanswered. In this study, as the first step to answer this question and using the Tonlé Sap Lake as an example, we quantified one of the impacts of hydro-dams on lake ecosystem's phenology in terms of open water area, a critical ecological characteristic that affects lake systems' fish production, biodiversity, and livelihoods of the local communities. We used the MODIS-NDVI time series, forecast function and the Mann-Kendall trend test method to first quantify the open water area, analyzed its changes over time, and then performed correlation analysis with climate variables to disentangle dam impacts. The results showed reduced hydro-periods, diminishing lake seasonality and a declining trend in Tonlé Sap Lake open water area over the past 15 years. These changes were insignificantly related to climatic influence during the same period. It is concluded that basin-wide hydro-dam construction and associated agricultural irrigation were deemed to be the primary cause of these ecological changes. Further analyses of changes in the lake's ecosystem services, including provision and cultural services, need to be carried out in order to have a holistic understanding of the trade-offs brought by the hydro-dam proliferation as a solution to the emerging energy and food demand in the LMRB. Published by Elsevier Inc.

  14. Modeling of snow avalanches for protection measures designing

    NASA Astrophysics Data System (ADS)

    Turchaninova, Alla; Lazarev, Anton; Loginova, Ekaterina; Seliverstov, Yuri; Glazovskaya, Tatiana; Komarov, Anton

    2017-04-01

    Avalanche protection structures such as dams have to be designed using well known standard engineering procedures that differ in different countries. Our intent is to conduct a research on structural avalanche protection measures designing and their reliability assessment during the operation using numerical modeling. In the Khibini Mountains, Russia, several avalanche dams have been constructed at different times to protect settlements and mining. Compared with other mitigation structures dams are often less expensive to construct in mining regions. The main goal of our investigation was to test the capabilities of Swiss avalanche dynamics model RAMMS and Russian methods to simulate the interaction of avalanches with mitigation structures such as catching and reflecting dams as well as to reach the observed runout distances after the transition through a dam. We present the RAMMS back-calculation results of an artificially triggered and well-documented catastrophic avalanche occurred in the town of Kirovsk, Khibini Mountains in February 2016 that has unexpectedly passed through a system of two catching dams and took the lives of 3 victims. The estimated volume of an avalanche was approximately 120,000 m3. For the calculation we used a 5 m DEM including catching dams generated from field measurements in summer 2015. We simulated this avalanche (occurred below 1000 m.a.s.l.) in RAMMS having taken the friction parameters (µ and ζ) from the upper altitude limit (above 1500 m.a.s.l.) from the table recommended for Switzerland (implemented into RAMMS) according to the results of our previous research. RAMMS reproduced the observed avalanche behavior and runout distance. No information is available concerning the flow velocity; however, calculated values correspond in general to the values measured in this avalanche track before. We applied RAMMS using an option of adding structures to DEM (including a dam in GIS) in other to test other operating catching dams in Khibini Mountains by different avalanche scenarios and discuss the technical procedure and obtained results. RAMMS results were compared with field observations data and values received with Russian well-known one dimensional avalanche models. In the Caucasus, Russia, new ski resorts are being under the development which is impossible without avalanche protection. The choice of the avalanche mitigation type has to be done by experts depending on many factors. Within the ski resort Arkhyz, Caucasus we implemented RAMMS into the procedure of the structural measures type decision making. RAMMS as well as Russian well-known one-dimensional models were used to calculate the key input parameters for structures designing. The calculation results were coupled with field observations data and historical records. Finally we suggested the avalanche protection plan for the area of interest. The interpretation of RAMMS simulations including mitigation structures has been made in order to assess the reliability of the proposed protection.

  15. Relation between flows and dissolved oxygen in the Roanoke River between Roanoke Rapids Dam and Jamesville, North Carolina, 2005-2009

    USGS Publications Warehouse

    Wehmeyer, Loren L.; Wagner, Chad R.

    2011-01-01

    The relation between dam releases and dissolved-oxygen concentration, saturation and deficit, downstream from Roanoke Rapids Dam in North Carolina was evaluated from 2005 to 2009. Dissolved-oxygen data collected at four water-quality monitoring stations downstream from Roanoke Rapids Dam were used to determine if any statistical relations or discernible quantitative or qualitative patterns linked Roanoke River in-stream dissolved-oxygen levels to hydropower peaking at Roanoke Rapids Dam. Unregulated tributaries that inundate and drain portions of the Roanoke River flood plain are crucial in relation to in-stream dissolved oxygen. Hydropower peaking from 2005 to 2009 both inundated and drained portions of the flood plain independently of large storms. The effects of these changes in flow on dissolved-oxygen dynamics are difficult to isolate, however, because of (1) the variable travel time for water to move down the 112-mile reach of the Roanoke River from Roanoke Rapids Dam to Jamesville, North Carolina, and (2) the range of in-situ conditions, particularly inundation history and water temperature, in the flood plain. Statistical testing was conducted on the travel-time-adjusted hourly data measured at each of the four water-quality stations between May and November 2005-2009 when the weekly mean flow was 5,000-12,000 cubic feet per second (a range when Roanoke Rapids Dam operations likely affect tributary and flood-plain water levels). Results of this statistical testing indicate that at the 99-percent confidence interval dissolved-oxygen levels downstream from Roanoke Rapids Dam were lower during peaking weeks than during non-peaking weeks in three of the five years and higher in one of the five years; no data were available for weeks with peaking in 2007. For the four years of statistically significant differences in dissolved oxygen between peaking and non-peaking weeks, three of the years had statistically signficant differences in water temperature. Years with higher water temperature during peaking had lower dissolved oxygen during peaking. Only 2009 had no constistent statistically significant water-temperature difference at all sites, and dissolved-oxygen levels downstream from Roanoke Rapids Dam during peaking weeks that year were lower than during non-peaking weeks. Between 2005 and 2009, daily mean dissolved-oxygen concentrations below the State standard occurred during only 1 of the 17 (6 percent) peaking weeks, with no occurrence of instantaneous dissolved-oxygen concentrations below the State standard. This occurrence was during a 9-day period in July 2005 when the daily maximum air temperatures approached or exceeded 100 degrees Fahrenheit, and the draining of the flood plains from peaking operations was followed by consecutive days of low flows.

  16. The future role of dams in the United States of America

    NASA Astrophysics Data System (ADS)

    Ho, Michelle; Lall, Upmanu; Allaire, Maura; Devineni, Naresh; Kwon, Hyun Han; Pal, Indrani; Raff, David; Wegner, David

    2017-02-01

    xml:id="wrcr22481-sec-1001" numbered="no">Storage and controlled distribution of water have been key elements of a human strategy to overcome the space and time variability of water, which have been marked by catastrophic droughts and floods throughout the course of civilization. In the United States, the peak of dam building occurred in the mid-20th century with knowledge limited to the scientific understanding and hydrologic records of the time. Ecological impacts were considered differently than current legislative and regulatory controls would potentially dictate. Additionally, future costs such as maintenance or removal beyond the economic design life were not fully considered. The converging risks associated with aging water storage infrastructure and uncertainty in climate in addition to the continuing need for water storage, flood protection, and hydropower result in a pressing need to address the state of dam infrastructure across the nation. Decisions regarding the future of dams in the United States may, in turn, influence regional water futures through groundwater outcomes, economic productivity, migration, and urban growth. We advocate for a comprehensive national water assessment and a formal analysis of the role dams play in our water future. We emphasize the urgent need for environmentally and economically sound strategies to integrate surface and groundwater storage infrastructure in local, regional, and national water planning considerations. A research agenda is proposed to assess dam failure impacts and the design, operation, and need for dams considering both paleo and future climate, utilization of groundwater resources, and the changing societal values toward the environment.

  17. Potential Effects of Dams on Migratory Fish in the Mekong River: Lessons from Salmon in the Fraser and Columbia Rivers

    NASA Astrophysics Data System (ADS)

    Ferguson, John W.; Healey, Michael; Dugan, Patrick; Barlow, Chris

    2011-01-01

    We compared the effects of water resource development on migratory fish in two North American rivers using a descriptive approach based on four high-level indicators: (1) trends in abundance of Pacific salmon, (2) reliance on artificial production to maintain fisheries, (3) proportion of adult salmon that are wild- versus hatchery-origin, and (4) number of salmon populations needing federal protection to avoid extinction. The two rivers had similar biological and physical features but radically different levels of water resource development: the Fraser River has few dams and all are located in tributaries, whereas the Columbia River has more than 130 large mainstem and tributary dams. Not surprisingly, we found substantial effects of development on salmon in the Columbia River. We related the results to potential effects on migratory fish in the Mekong River where nearly 200 mainstem and tributary dams are installed, under construction, or planned and could have profound effects on its 135 migratory fish species. Impacts will vary with dam location due to differential fish production within the basin, with overall effects likely being greatest from 11 proposed mainstem dams. Minimizing impacts will require decades to design specialized fish passage facilities, dam operations, and artificial production, and is complicated by the Mekong's high diversity and productivity. Prompt action is needed by governments and fisheries managers to plan Mekong water resource development wisely to prevent impacts to the world's most productive inland fisheries, and food security and employment opportunities for millions of people in the region.

  18. National Dam Safety Program. Garnerville Dam (Inventory Number N.Y. 744), Hudson River Basin, Rockland County, New York. Phase I Inspection Report,

    DTIC Science & Technology

    1980-08-01

    drain and the 8-inch pipeline are in good operating condition and appear to be well maintained. e. Reservoir Area There are neither slides, rockfalls ...Stability fOpcrc c- ,k- I p. Miscellaneous 1 1I I L Project ._Dheet___ _.. Subject ABy Gi ___ A _ A _Chk. by I 0 Q I 40 CiQI /" e6dn-r-f/aa /Ortf e / 7, 4 o

  19. Test and Evaluation of MeshDynamics 802.11 Multi-Radio Mesh Modules in Support of Coalition Riverine Operations

    DTIC Science & Technology

    2006-06-01

    scenario, occurring just north of Chiang Mai , Thailand at the Mae Ngat Dam. Figure 3 is a map of Thailand and some of its bordering countries...displayed, and distributed in real-time to local ( Chiang Mai ), theater (Bangkok), and global (Alameda and Monterey, CA) Command and Control (C2) 11...systems in support of tactical action scenarios. This year’s COASTS scenario took place at the Mae Ngat Dam, located just north of Chiang Mai , Thailand

  20. 19. Photographic copy of photograph. (Source: U.S. Department of Interior. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1925. Vol. I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. SACATON DAM AND BRIDGE, CANAL BRIDGE, OPERATING HOUSE AND INTAKE, SOUTH END, 2/14/25 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ

  1. State-and-transition prototype model of riparian vegetation downstream of Glen Canyon Dam, Arizona

    USGS Publications Warehouse

    Ralston, Barbara E.; Starfield, Anthony M.; Black, Ronald S.; Van Lonkhuyzen, Robert A.

    2014-01-01

    Facing an altered riparian plant community dominated by nonnative species, resource managers are increasingly interested in understanding how to manage and promote healthy riparian habitats in which native species dominate. For regulated rivers, managing flows is one tool resource managers consider to achieve these goals. Among many factors that can influence riparian community composition, hydrology is a primary forcing variable. Frame-based models, used successfully in grassland systems, provide an opportunity for stakeholders concerned with riparian systems to evaluate potential riparian vegetation responses to alternative flows. Frame-based, state-and-transition models of riparian vegetation for reattachment bars, separation bars, and the channel margin found on the Colorado River downstream of Glen Canyon Dam were constructed using information from the literature. Frame-based models can be simple spreadsheet models (created in Microsoft® Excel) or developed further with programming languages (for example, C-sharp). The models described here include seven community states and five dam operations that cause transitions between states. Each model divides operations into growing (April–September) and non-growing seasons (October–March) and incorporates upper and lower bar models, using stage elevation as a division. The inputs (operations) can be used by stakeholders to evaluate flows that may promote dynamic riparian vegetation states, or identify those flow options that may promote less desirable states (for example, Tamarisk [Tamarix sp.] temporarily flooded shrubland). This prototype model, although simple, can still elicit discussion about operational options and vegetation response.

  2. Physical Hydraulic Model of Side-Channel Spillway of Lambuk DAM, Bali

    NASA Astrophysics Data System (ADS)

    Harifa, A. C.; Sholichin, M.; Othman, F. B.

    2013-12-01

    The spillway is among the most important structures of a dam project. A spillway is designed to prevent overtopping of a dam at a place that is not designed for overtopping. Side-channel spillways are commonly used to release water flow from a reservoir in places where the sides are steep and have a considerable height above the dam. Experimental results were collected with a hydraulic model of the side-channel spillway for releasing the peak overflow of Lambuk Dam. This dam is, located on the Lambuk River, which is a tributary of the Yeh Hoo River ~ 34.6 km north of Denpasar on the island of Bali. The bituminous geomembrane faced dam is 24 m in height, with a 35-m wide spillway. The length of the side channel is 35 m long, with 58 m of transition channel, 67.37 m of chuteway channel and 22.71 m of stilling basin. The capacity of the spillway is 231.91 m3/s and the outlet works capacity is 165.28 m3/s. The reservoir is designed for irrigation and water supply. The purpose of this study was to optimize the designed of the structure and to ensure its safe operation. In hydraulic model may help the decision-makers to visualize the flow field before selecting a ';suitable' design. The hydraulic model study was performed to ensure passage of the maximum discharge at maximum reservoir capacity; to study the spillway approach conditions, water surface profiles, and flow patterns in the chuteway; and to reveal potential demerits of the proposed hydraulic design of various structures and explore solutions. The model was constructed at 1 : 40 scale, Reservoir topography was modeled using concrete, the river bed using sand and some gravel, the river berm using concrete, and the spillway and channel using Plexiglas. Water was measured using Rectangular contracted weir. Design floods (with return period in year) were Q2 = 111.40 m3/s, Q5 = 136.84 m3/s, Q10 = 159.32 m3/s, Q25 = 174.61 m3/s, Q50 = 185.13 m3/s, Q100 = 198.08 m3/s, Q200 = 210.55 m3/s, Q1000 = 231.91 m3/s and the probable maximum flood was 476.88 m3/s. Hydraulic analysis of spillway used USBR method for spillway, Hind's equation for the side channel, energy equation with standard step method for the transition and chuteway channel. Local scouring depth was calculated using the Schotlisch and Veronise equation. Total head on crest spillway for Q2 = 0.92 m, Q1000 = 1.68 m and for QPMF = 1.92 m. The highest measurement error is 3.16% according to the total head on crest spillway. Cavitation was observed in chuteway. Flow is subcritical (Froude < 1) in the side channel and supercritical in the transition channel. The final design for the spillway and chuteway were safe from impact of cavitation, pulsating flow, and local scouring.

  3. Trade-off Assessment of Simplified Routing Models for Short-Term Hydropower Reservoir Optimization

    NASA Astrophysics Data System (ADS)

    Issao Kuwajima, Julio; Schwanenberg, Dirk; Alvardo Montero, Rodolfo; Mainardi Fan, Fernando; Assis dos Reis, Alberto

    2014-05-01

    Short-term reservoir optimization, also referred to as model predictive control, integrates model-based forecasts and optimization algorithms to meet multiple management objectives such as water supply, navigation, hydroelectricity generation, environmental obligations and flood protection. It is a valuable decision support tool to handle water-stress conditions or flooding events, and supports decision makers to minimize their impact. If the reservoir management includes downstream control, for example for mitigation flood damages in inundation areas downstream of the operated dam, the flow routing between the dam and the downstream inundation area is of major importance. The unsteady open channel flow in river reaches can be described by the one-dimensional Saint-Venant equations. However, owing to the mathematical complexity of those equations, some simplifications may be required to speed up the computation within the optimization procedure. Another strategy to limit the model runtime is a schematization on a course computational grid. In particular the last measure can introduce significant numerical diffusion into the solution. This is a major drawback, in particular if the reservoir release has steep gradients which we often find in hydropower reservoirs. In this work, four different routing models are assessed concerning their implementation in the predictive control of the Três Marias Reservoir located at the Upper River São Francisco in Brazil: i) a fully dynamic model using the software package SOBEK; ii) a semi-distributed rainfall-runoff model with Muskingum-Cunge routing for the flow reaches of interest, the MGB-IPH (Modelo Hidrológico de Grandes Bacias - Instituto de Pesquisas Hidráulicas); iii) a reservoir routing approach; and iv) a diffusive wave model. The last two models are implemented in the RTC-Tool toolbox. The overall model accuracy between the simplified models in RTC-Tools (iii, iv) and the more sophisticated SOBEK model (i) are comparable, and a lower performance was assessed for the MGB model (ii). Whereas the SOBEK model is able to propagate sharp discharge gradient downstream, the diffusive wave model is damping these gradients significantly due to the course spatial schematization. In the reservoir routing model, which is also schematized on a course grid, we counteract this drawback by modeling parts of the river reach by advection. This results in an excellent ratio between model accuracy / robustness and computational effort making it the approach of choice from the predictive control perspective.

  4. 14 CFR 93.71 - General operating procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...) AIR TRAFFIC AND GENERAL OPERATING RULES SPECIAL AIR TRAFFIC RULES Flight Restrictions in the Vicinity... International Control Dam) to the United States/Canadian Border and thence along the border to the point of... to approval of Transport Canada, aircraft carrying law enforcement officials, or aircraft carrying...

  5. Performance assessment of deterministic and probabilistic weather predictions for the short-term optimization of a tropical hydropower reservoir

    NASA Astrophysics Data System (ADS)

    Mainardi Fan, Fernando; Schwanenberg, Dirk; Alvarado, Rodolfo; Assis dos Reis, Alberto; Naumann, Steffi; Collischonn, Walter

    2016-04-01

    Hydropower is the most important electricity source in Brazil. During recent years, it accounted for 60% to 70% of the total electric power supply. Marginal costs of hydropower are lower than for thermal power plants, therefore, there is a strong economic motivation to maximize its share. On the other hand, hydropower depends on the availability of water, which has a natural variability. Its extremes lead to the risks of power production deficits during droughts and safety issues in the reservoir and downstream river reaches during flood events. One building block of the proper management of hydropower assets is the short-term forecast of reservoir inflows as input for an online, event-based optimization of its release strategy. While deterministic forecasts and optimization schemes are the established techniques for the short-term reservoir management, the use of probabilistic ensemble forecasts and stochastic optimization techniques receives growing attention and a number of researches have shown its benefit. The present work shows one of the first hindcasting and closed-loop control experiments for a multi-purpose hydropower reservoir in a tropical region in Brazil. The case study is the hydropower project (HPP) Três Marias, located in southeast Brazil. The HPP reservoir is operated with two main objectives: (i) hydroelectricity generation and (ii) flood control at Pirapora City located 120 km downstream of the dam. In the experiments, precipitation forecasts based on observed data, deterministic and probabilistic forecasts with 50 ensemble members of the ECMWF are used as forcing of the MGB-IPH hydrological model to generate streamflow forecasts over a period of 2 years. The online optimization depends on a deterministic and multi-stage stochastic version of a model predictive control scheme. Results for the perfect forecasts show the potential benefit of the online optimization and indicate a desired forecast lead time of 30 days. In comparison, the use of actual forecasts with shorter lead times of up to 15 days shows the practical benefit of actual operational data. It appears that the use of stochastic optimization combined with ensemble forecasts leads to a significant higher level of flood protection without compromising the HPP's energy production.

  6. Monitoring displacements of an earthen dam using GNSS and remote sensing

    NASA Astrophysics Data System (ADS)

    Dardanelli, Gino; La Loggia, Goffredo; Perfetti, Nicola; Capodici, Fulvio; Puccio, Luigi; Maltese, Antonino

    2014-10-01

    This paper shows the results of a scientific research in which a GNSS continuous monitoring system for earth-dam deformations has been developed, then, deformations have been related with reservoir water surface and level. The experiment was conducted near Bivona (Sicily, Italy), on the Castello dam (Magazzolo Lake). On the top of the dam three control points were placed and three GNSS permanent stations were installed. The three stations continuously transmitted data to the control centre of the University of Palermo. The former has been determined using freely available satellite data (specifically Landsat 7 SLC-Off) collected during the whole study period (DOYs 101 to 348 2011). Issues related with the un-scanned rows filling and to better distinguish water from land pixels on the shoreline. The aim of this work is various: first of all, we want to evaluate whether the GPS post processing techniques can provide static results comparable to other monitoring techniques, such as spirit levelling. The study could take a significant importance given that the Italian legislation until today does not provide for the use of this technology to manage or monitor dams displacements or other civil engineering constructions. The use of GPS data in structural monitoring could in fact reduce some management costs. Usually the conventional GPS monitoring methods, where a base station GPS receiver must be located near the dam, did not ensure that the accuracy of results have been independent from the displacement of the crown (top end of dam). In this paper, a new approach in the area of study of the GNSS permanent network has been engaged to solve these problems. Field-testing results show that the new GNSS approach has excellent performances, and the monitoring of different section of the dam could reveal important information on its deformation, that its not operationally possible to retrieve elsewhere. The post-processing accuracy positioning is around 1-5 mm for the deformations monitoring of the Castello dam. Displacements of different sections of the dam reveal different behaviour (in time and periodicity) that looks to be related with water surface (and level) retrieved from remote sensing.

  7. Dam operations may improve aquatic habitat and offset negative effects of climate change.

    PubMed

    Benjankar, Rohan; Tonina, Daniele; McKean, James A; Sohrabi, Mohammad M; Chen, Quiwen; Vidergar, Dmitri

    2018-05-01

    Dam operation impacts on stream hydraulics and ecological processes are well documented, but their effect depends on geographical regions and varies spatially and temporally. Many studies have quantified their effects on aquatic ecosystem based mostly on flow hydraulics overlooking stream water temperature and climatic conditions. Here, we used an integrated modeling framework, an ecohydraulics virtual watershed, that links catchment hydrology, hydraulics, stream water temperature and aquatic habitat models to test the hypothesis that reservoir management may help to mitigate some impacts caused by climate change on downstream flows and temperature. To address this hypothesis we applied the model to analyze the impact of reservoir operation (regulated flows) on Bull Trout, a cold water obligate salmonid, habitat, against unregulated flows for dry, average, and wet climatic conditions in the South Fork Boise River (SFBR), Idaho, USA. Copyright © 2018 Elsevier Ltd. All rights reserved.

  8. White sturgeon mitigation and restoration in the Columbia and Snake rivers upstream from Bonneville Dam, Annual Progress Report April 2004 - March 2005. Report C

    USGS Publications Warehouse

    Parsley, M.J.; Kofoot, P.

    2006-01-01

    River discharge and water temperatures that occurred during April through July 2004 provided conditions suitable for spawning by white sturgeon downstream from Bonneville, The Dalles, John Day, and McNary dams. Optimal spawning temperatures in the four tailraces occurred for 3-4 weeks and coincided with the peak of the river hydrograph. However, the peak of the hydrograph was relatively low compared to past years, which is reflected in the relatively low monthly and annual indices of suitable spawning habitat. Bottom-trawl sampling in the Bonneville Reservoir revealed the presence of young-of-theyear (YOY) white sturgeon.

  9. USGS Workshop on Scientific Aspects of a Long-Term Experimental Plan for Glen Canyon Dam, April 10-11, 2007, Flagstaff, Arizona

    USGS Publications Warehouse

    ,

    2008-01-01

    Executive Summary Glen Canyon Dam is located in the lower reaches of Glen Canyon National Recreation Area on the Colorado River, approximately 15 miles upriver from Grand Canyon National Park (fig. 1). In 1992, Congress passed and the President signed into law the Grand Canyon Protection Act (GCPA; title XVIII, sec. 1801?1809, of Public Law 102-575), which seeks ?to protect, mitigate adverse impacts to, and improve the values for which Grand Canyon National Park and Glen Canyon National Recreation Area were established.? The Glen Canyon Dam Adaptive Management Program (GCDAMP) was implemented as a result of the 1996 Record of Decision on the Operation of Glen Canyon Dam Final Environmental Impact Statement to ensure that the primary mandate of the GCPA is met through advances in information and resources management (U.S. Department of the Interior, 1995). On November 3, 2006, the Bureau of Reclamation (Reclamation) announced it would develop a long-term experimental plan environmental impact statement (LTEP EIS) for operational activities at Glen Canyon Dam and other management actions on the Colorado River. The purpose of the long-term experimental plan is twofold: (1) to increase the scientific understanding of the ecosystem and (2) to improve and protect important downstream resources. The proposed plan would implement a structured, longterm program of experimentation to include dam operations, potential modifications to Glen Canyon Dam intake structures, and other management actions such as removal of nonnative fish species. The development of the long-term experimental plan continues efforts begun by the GCDAMP to protect resources downstream of Glen Canyon Dam, including Grand Canyon, through adaptive management and scientific experimentation. The LTEP EIS will rely on the extensive scientific studies that have been undertaken as part of the adaptive management program by the U.S. Geological Survey?s (USGS) Grand Canyon Monitoring and Research Center (GCMRC), one of the four research stations within the USGS Southwest Biological Science Center. On April 10 and 11, 2007, at the behest of Reclamation, the GCMRC convened a workshop with scientific experts to identify one or more scientifically credible, long-term experimental options for Reclamation to consider for the LTEP EIS that would be consistent with the purpose and need for the plan. Workshop participants included government, academic, and private scientists with broad experience in the Colorado River in Grand Canyon and regulated rivers around the world. Resource managers and GCDAMP participants were also present on the second day of the workshop. In advance of the workshop, Reclamation and LTEP EIS cooperating agencies identified 14 core scientific questions. Workshop participants were asked to consider how proposed options would address these questions, which fall primarily into four areas: (1) conservation of endangered humpback chub (Gila cypha) and other high-priority biological resources, (2) conservation of sediment resources, (3) enhancement of recreational resources, and (4) preservation of cultural resources. A secondary objective of the workshop was the evaluation of four long-term experimental options developed by the GCDAMP Science Planning Group (SPG) (appendix B). The flow and nonflow treatments called for in the four experimental options were an important starting point for workshop discussions. At the beginning of the workshop, participants were provided with the final LTEP EIS scoping report prepared by Reclamation. Participants were also advised that Reclamation had committed to ?make every effortEto ensure that a new population of humpback chub is established in the mainstem or one or more of the tributaries within Grand Canyon? in the 1995 Operation of Glen Canyon Dam Final Environmental Impact Statement (U.S. Department of the Interior, 1995). This decision was consistent with the U.S. Fish and Wildlife Service?s 1995 bi

  10. 78 FR 15007 - Notice of Open House-Draft Environmental Impact Statement for Revised Water Control Manuals for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-08

    ... by USACE to operate a system of five Federal reservoir projects in the basin--Allatoona Dam and Lake... manuals for the ACT Basin in order to improve operations for authorized purposes to reflect changed... determine how the federal projects in the ACT Basin should adjust operations for their authorized purposes...

  11. Displacement-based back-analysis of the model parameters of the Nuozhadu high earth-rockfill dam.

    PubMed

    Wu, Yongkang; Yuan, Huina; Zhang, Bingyin; Zhang, Zongliang; Yu, Yuzhen

    2014-01-01

    The parameters of the constitutive model, the creep model, and the wetting model of materials of the Nuozhadu high earth-rockfill dam were back-analyzed together based on field monitoring displacement data by employing an intelligent back-analysis method. In this method, an artificial neural network is used as a substitute for time-consuming finite element analysis, and an evolutionary algorithm is applied for both network training and parameter optimization. To avoid simultaneous back-analysis of many parameters, the model parameters of the three main dam materials are decoupled and back-analyzed separately in a particular order. Displacement back-analyses were performed at different stages of the construction period, with and without considering the creep and wetting deformations. Good agreement between the numerical results and the monitoring data was obtained for most observation points, which implies that the back-analysis method and decoupling method are effective for solving complex problems with multiple models and parameters. The comparison of calculation results based on different sets of back-analyzed model parameters indicates the necessity of taking the effects of creep and wetting into consideration in the numerical analyses of high earth-rockfill dams. With the resulting model parameters, the stress and deformation distributions at completion are predicted and analyzed.

  12. Kootenai River velocities, depth, and white sturgeon spawning site selection – A mystery unraveled?

    USGS Publications Warehouse

    Paragamian, V.L.; McDonald, R.; Nelson, G.J.; Barton, G.

    2009-01-01

    The Kootenai River white sturgeon Acipenser transmontanus population in Idaho, US and British Columbia (BC), Canada became recruitment limited shortly after Libby Dam became fully operational on the Kootenai River, Montana, USA in 1974. In the USA the species was listed under the Endangered Species Act in September of 1994. Kootenai River white sturgeon spawn within an 18-km reach in Idaho, river kilometer (rkm) 228.0–246.0. Each autumn and spring Kootenai River white sturgeon follow a ‘short two-step’ migration from the lower river and Kootenay Lake, BC, to staging reaches downstream of Bonners Ferry, Idaho. Initially, augmented spring flows for white sturgeon spawning were thought to be sufficient to recover the population. Spring discharge mitigation enhanced white sturgeon spawning but a series of research investigations determined that the white sturgeon were spawning over unsuitable incubation and rearing habitat (sand) and that survival of eggs and larvae was negligible. It was not known whether post-Libby Dam management had changed the habitat or if the white sturgeon were not returning to more suitable spawning substrates farther upstream. Fisheries and hydrology researchers made a team effort to determine if the spawning habitat had been changed by Libby Dam operations. Researchers modeled and compared velocities, sediment transport, and bathymetry with post-Libby Dam white sturgeon egg collection locations. Substrate coring studies confirmed cobbles and gravel substrates in most of the spawning locations but that they were buried under a meter or more of post-Libby Dam sediment. Analysis suggested that Kootenai River white sturgeon spawn in areas of highest available velocity and depths over a range of flows. Regardless of the discharge, the locations of accelerating velocities and maximum depth do not change and spawning locations remain consistent. Kootenai River white sturgeon are likely spawning in the same locations as pre-dam, but post-Libby Dam water management has reduced velocities and shear stress, thus sediment is now covering the cobbles and gravels. Although higher discharges will likely provide more suitable spawning and rearing conditions, this would be socially and politically unacceptable because it would bring the river elevation to or in excess of 537.66 m, which is flood stage. Thus, support should be given to habitat modifications incorporated into a management plan to restore suitable habitat and ensure better survival of eggs and larvae.

  13. Discharge ratings for control gates at Mississippi River lock and dam 12, Bellevue, Iowa

    USGS Publications Warehouse

    Heinitz, Albert J.

    1986-01-01

    The water level of the navigation pools on the Mississippi River are maintained by the operation of tainter and roller gates at the locks and dams. Discharge ratings for the gates on Lock and Dam 12, at Bellevue, Iowa, were developed from current-meter discharge measurements made in the forebays of the gate structures. Methodology is given to accurately compute the gate openings of the tainter gates. Discharge coefficients, in equations that express discharge as a function of tailwater head , forebay head, and height of gate opening, were determined for conditions of submerged-orifice and fee-weir flow. A comparison of the rating discharges to the hydraulic-model rating discharges is given for submerged orifice flow for the tainter and roller gates.

  14. Time-Frequency Methods for Structural Health Monitoring †

    PubMed Central

    Pyayt, Alexander L.; Kozionov, Alexey P.; Mokhov, Ilya I.; Lang, Bernhard; Meijer, Robert J.; Krzhizhanovskaya, Valeria V.; Sloot, Peter M. A.

    2014-01-01

    Detection of early warning signals for the imminent failure of large and complex engineered structures is a daunting challenge with many open research questions. In this paper we report on novel ways to perform Structural Health Monitoring (SHM) of flood protection systems (levees, earthen dikes and concrete dams) using sensor data. We present a robust data-driven anomaly detection method that combines time-frequency feature extraction, using wavelet analysis and phase shift, with one-sided classification techniques to identify the onset of failure anomalies in real-time sensor measurements. The methodology has been successfully tested at three operational levees. We detected a dam leakage in the retaining dam (Germany) and “strange” behaviour of sensors installed in a Boston levee (UK) and a Rhine levee (Germany). PMID:24625740

  15. Estimating suspended sediment load with multivariate adaptive regression spline, teaching-learning based optimization, and artificial bee colony models.

    PubMed

    Yilmaz, Banu; Aras, Egemen; Nacar, Sinan; Kankal, Murat

    2018-05-23

    The functional life of a dam is often determined by the rate of sediment delivery to its reservoir. Therefore, an accurate estimate of the sediment load in rivers with dams is essential for designing and predicting a dam's useful lifespan. The most credible method is direct measurements of sediment input, but this can be very costly and it cannot always be implemented at all gauging stations. In this study, we tested various regression models to estimate suspended sediment load (SSL) at two gauging stations on the Çoruh River in Turkey, including artificial bee colony (ABC), teaching-learning-based optimization algorithm (TLBO), and multivariate adaptive regression splines (MARS). These models were also compared with one another and with classical regression analyses (CRA). Streamflow values and previously collected data of SSL were used as model inputs with predicted SSL data as output. Two different training and testing dataset configurations were used to reinforce the model accuracy. For the MARS method, the root mean square error value was found to range between 35% and 39% for the test two gauging stations, which was lower than errors for other models. Error values were even lower (7% to 15%) using another dataset. Our results indicate that simultaneous measurements of streamflow with SSL provide the most effective parameter for obtaining accurate predictive models and that MARS is the most accurate model for predicting SSL. Copyright © 2017 Elsevier B.V. All rights reserved.

  16. Behavior and dam passage of juvenile Chinook salmon at Cougar Reservoir and Dam, Oregon, March 2011 - February 2012

    USGS Publications Warehouse

    Beeman, John W.; Hansel, Hal C.; Hansen, Amy C.; Haner, Philip V.; Sprando, Jamie M.; Smith, Collin D.; Evans, Scott D.; Hatton, Tyson W.

    2013-01-01

    The movements and dam passage of juvenile Chinook salmon implanted with acoustic transmitters and passive integrated transponder tags were studied at Cougar Reservoir and Dam, near Springfield, Oregon. The purpose of the study was to provide information to aid with decisions about potential alternatives for improving downstream passage conditions for juvenile salmonids in this flood-control reservoir. In 2011, a total of 411 hatchery fish and 26 wild fish were tagged and released during a 3-month period in the spring, and another 356 hatchery fish and 117 wild fish were released during a 3-month period in the fall. A series of 16 autonomous hydrophones throughout the reservoir and 12 hydrophones in a collective system near the dam outlet were used to determine general movements and dam passage of the fish over the life of the acoustic transmitter, which was expected to be about 3 months. Movements within the reservoir were directional, and it was common for fish to migrate repeatedly from the head of the reservoir downstream to the dam outlet and back to the head of the reservoir. Most fish were detected near the temperature control tower at least once. The median time from release near the head of the reservoir to detection within about 100 meters of the dam outlet at the temperature control tower was between 5.7 and 10.8 days, depending on season and fish origin. Dam passage events occurred over a wider range of dates in the spring and summer than in the fall and winter, but dam passage numbers were greatest during the fall and winter. A total of 10.5 percent (43 of 411) of the hatchery fish and 15.4 percent (4 of 26) of the wild fish released in the spring are assumed to have passed the dam, whereas a total of 25.3 percent (90 of 356) of the hatchery fish and 16.9 percent (30 of 117) of the wild fish released in the fall are assumed to have passed the dam. A small number of fish passed the dam after their transmitters had stopped working and were detected at passive integrated transponder detectors at various locations downstream of the dam, indicating some tagged fish passed the dam undetected. The rate of dam passage was affected by diel period, discharge, and reservoir elevation. Diel period was the most influential factor of those examined, with nighttime dam passage rates about 9 times greater than daytime rates, depending on the distance of fish from the dam outlet. Dam passage rates also were positively related to dam discharge, and negatively related to reservoir elevation. In the operational condition used as an example, fish approached the dam outlet at the temperature control tower from the south and east and, when most fish got near the tower, they were directly in front of it. In many cases, the results for wild and hatchery fish were similar, or the results suggested hatchery fish could be reasonable surrogates for wild fish. Hatchery-origin and wild-origin fish behaved similarly in the following ways: their general movements in the reservoir; the timing of their dam passage; and the effects of diel period, discharge, and elevation on their passage rates. Parasitic copepods were present on most wild fish examined, and the mortality of wild fish during capture, handling and tagging was much greater than that of hatchery fish. This suggests that the ability of wild fish to cope with stressors may be less than that of fish directly from the hatchery.

  17. Experience in operating earth dams of the NIVA cascade of the Kola Regional Power administration constructed in 1930-1960

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nosova, O.N.; Margolina, O.G.; Sergeeva, N.S.

    1995-08-01

    This article discusses Russian experiences in monitoring earth-filled dams of the Niva region. These are low and medium head facilities in operation from 30 to 60 years. As shown by the experiences of long-term operation of earth structures in this area and on embankments being constructed by the method of dumping soil into water, it is necessary to impose more stringent requirements with respect to determining the steepness of these slopes to increase their stability, as is done when the structures are constructed dry. To organize successful monitoring of seepage processes in the investigated structures having substantial anisotropy of themore » soil, special recommendations of the disposition of piezometers under such specific conditions should be worked out. Recommendations on the disposition of piezometers under conditions of a noticeable effect of the groundwater regime of the surrounding territory on the seepage regime of the hydro development should be worked out accordingly. Since the calculations made in the work, as a result of which instability of many slopes was detected, are not always confirmed by practice, it is advisable to correct the method of such calculations with consideration of the characteristics of the formation of the seepage flow in the downstream shoulder of dams with pronounced anisotropy of the soil.« less

  18. Development of water level regulation strategy for fish and wildlife, upper Mississippi River system

    USGS Publications Warehouse

    Lubinski, Kenneth S.; Carmody, G.; Wilcox, D.; Drazkowski, B.

    1991-01-01

    Water level regulation has been proposed as a tool for maintaining or enhancing fish and wildlife resources in navigation pools and associated flood plains of the Upper Mississippi River System. Research related to the development of water level management plans is being conducted under the Long Term Resource Monitoring Program. Research strategies include investigations of cause and effect relationships, spatial and temporal patterns of resource components, and alternative problem solutions. The principal hypothesis being tested states that water level fluctuations resulting from navigation dam operation create less than optimal conditions for the reproduction and growth of target aquatic macrophyte and fish species. Representative navigation pools have been selected to describe hydrologic, engineering, and legal constraints within which fish and wildlife objectives can be established. Spatial analyses are underway to predict the magnitude and location of habitat changes that will result from controlled changes in water elevation.

  19. Geophysical investigation of seepage beneath an earthen dam.

    PubMed

    Ikard, S J; Rittgers, J; Revil, A; Mooney, M A

    2015-01-01

    A hydrogeophysical survey is performed at small earthen dam that overlies a confined aquifer. The structure of the dam has not shown evidence of anomalous seepage internally or through the foundation prior to the survey. However, the surface topography is mounded in a localized zone 150 m downstream, and groundwater discharges from this zone periodically when the reservoir storage is maximum. We use self-potential and electrical resistivity tomography surveys with seismic refraction tomography to (1) determine what underlying hydrogeologic factors, if any, have contributed to the successful long-term operation of the dam without apparent indicators of anomalous seepage through its core and foundation; and (2) investigate the hydraulic connection between the reservoir and the seepage zone to determine whether there exists a potential for this success to be undermined. Geophysical data are informed by hydraulic and geotechnical borehole data. Seismic refraction tomography is performed to determine the geometry of the phreatic surface. The hydro-stratigraphy is mapped with the resistivity data and groundwater flow patterns are determined with self-potential data. A self-potential model is constructed to represent a perpendicular profile extending out from the maximum cross-section of the dam, and self-potential data are inverted to recover the groundwater velocity field. The groundwater flow pattern through the aquifer is controlled by the bedrock topography and a preferential flow pathway exists beneath the dam. It corresponds to a sandy-gravel layer connecting the reservoir to the downstream seepage zone. © 2014, National Ground Water Association.

  20. Understanding the Amazon Hydrology for Sustainable Hydropower Development

    NASA Astrophysics Data System (ADS)

    Pokhrel, Y. N.; Chaudhari, S. N.

    2017-12-01

    Construction of 147 new hydropower dams, many of which are large, has been proposed in the Amazon river basin, despite the continuous stacking of negative impacts from the existing ones. These dams are continued to be built in a way that disrupts river ecology, causes large-scale deforestation, and negatively affects both the food systems nearby and downstream communities. In this study, we explore the impacts of the existing and proposed hydropower dams on the hydrological fluxes across the Amazonian Basin by incorporating human impact modules in an extensively validated regional hydrological model called LEAF-Hydro-Flood (LHF). We conduct two simulations, one in offline mode, forced by observed meteorological data for the historical period of 2000-2016 and the other in a coupled mode using the Weather Research and Forecasting (WRF) regional climate model. We mainly analyze terrestrial water storage and streamflow changes during the period of dam operations with and without human impacts. It is certain that the Amazon will undergo some major hydrological changes such as decrease in streamflow downstream in the coming decades caused due to these proposed dams. This study helps us understand and represent processes in a predictable manner, and provides the ability to evaluate future scenarios with dams and other major human influences while considering climate change in the basin. It also provides important insights on how to redesign the hydropower systems to make them truly renewable in terms of energy production, hydrology and ecology.

  1. Preliminary stage-discharge relations for Tombigbee River at Aliceville lock and dam, near Pickensville, Alabama

    USGS Publications Warehouse

    Nelson, G.H.; Ming, C.O.

    1983-01-01

    The construction of Aliceville lock and dam and other related channel alterations, completed in 1979, has resulted in changes to the stage-discharge relations in the vicinity. The scarcity of current-meter measurements, coupled with backwater conditions, makes definition of a single stage-discharge relation impossible. However, limit curves can be defined that would encompass such a relation. Backwater is defined as water backed up or retarded in its course as compared with water flowing under normal or natural conditions. This results in a rise in stage above normal water level while the discharge remains unaffected. Backwater is usually caused by temporary obstruction(s) to flow downstream. Backwater at Aliceville Dam results from a variety of river conditions. Some of these conditions are large tributary inflow, return of flood plain flows to the main channel during recessions, and operations at Gainesville Dam during low flows. The discharges obtained from 26 current-meter measurements, along with computed discharges through the dam, are plotted versus stage. The plot illustrates, by the scatter of data points, the variations in backwater. Curves are drawn to envelope the extreme plot patterns showing possible ranges of several feet in stage for any given discharge. The upper end of the curves were extrapolated based on the results of a step-backwater analysis.

  2. Debris flow deposition and reworking by the Colorado River in Grand Canyon, Arizona

    USGS Publications Warehouse

    Yanites, Brian J.; Webb, Robert H.; Griffiths, Peter G.; Magirl, Christopher S.

    2006-01-01

    Flow regulation by large dams affects downstream flow competence and channel maintenance. Debris flows from 740 tributaries in Grand Canyon, Arizona, transport coarse‐grained sediment onto debris fans adjacent to the Colorado River. These debris fans constrict the river to form rapids and are reworked during river flows that entrain particles and transport them downstream. Beginning in 1963, flood control operations of Glen Canyon Dam limited the potential for reworking of aggraded debris fans. We analyzed change in debris fans at the mouths of 75‐Mile and Monument Creeks using photogrammetry of aerial photography taken from 1965 to 2000 and supplemented with ground surveys performed from 1987 to 2005. Our results quantify the debris fan aggradation that resulted from debris flows from 1984 to 2003. Volume, area, and river constriction increased at both debris fans. Profiles of the two debris fans show that net aggradation occurred in the middle of debris fans at stages above maximum dam releases, and surface shape shifted from concave to convex. Dam releases above power plant capacity partially reworked both debris fans, although reworking removed much less sediment than what was added by debris flow deposition. Large dam releases would be required to create additional reworking to limit the rate of debris fan aggradation in Grand Canyon.

  3. Riparian Vegetation Encroachment Ratios in rivers below large Dams

    NASA Astrophysics Data System (ADS)

    Garcia de Jalón, Diego; Martínez-Fernández, Vanesa; González del Tánago, Marta

    2017-04-01

    Large Dams and reservoirs change the natural flow regime and consequently cause many alterations in riparian vegetation dynamics which may be assessed at different spatial and temporal scales. In Mediterranean regions flow regulation is frequently associated with irrigation. Regulated rivers with this purpose very often show reduced discharges during the wet season when the reservoir is being filled and increased discharges during the dry season when irrigation takes place. This type of regulation frequently promotes riparian vegetation growth as soil moisture levels are increased during summer when a natural drought would otherwise limit its growth. Additionally, flow regulation by large dams promotes the aging of late seral riparian vegetation reducing the frequency of flood disturbance and consequently, the potential recruitment of pioneer species. In this work we study the response of woody riparian vegetation to flow regulation by large dams in four rivers from Central Spain: Jarama, Manzanares, Guadalix and Alberche. The aim is to quantify the annual vegetation encroachment ratios and to develop a model to understand the main controlling factors, such as floodplain and channel traits; flow regulation intensity; type of regulation; present vegetation canopy; distance to the dam; and time since dam commissioning. A temporal comparison using aerial photographs from 1956, 1966, 1972, 1991, 2011 and 2014 was done in thirteen river reaches downstream from large dams, to evaluate their morphological evolution.. Floodplain dimensions and channel and riparian vegetation changes were assessed by comparing different pre-dam and post-dam conditions. Recent coloured photographs with 0.5 m spatial resolution and older black-and-white photographs at 1:33 000 spatial scale were supplied by the National Geographic Institute of Spain (www.ign.es) and the Statistical Institute (www.madrid.org/nomecalles/Inicio.icm) from Madrid Community. Similar visual scales were used to cope with different air photographs resolution. Results show a generalized natural vegetation encroachment process. Two exceptions were found associated with farming (Jarama 3) and poplar plantation (Alberche 1) that occupied riparian soils.. Annual encroachment ratios, range from 1 to 55 Ha/km, with a mean value of 12 Ha per km of river length. Higher values are found in the lowest reaches, which are far from the dam (5 cases), and also in the years following the beginning of dam operation. However, other reaches showed a delay of several years in the encroaching process, likely associated to scarcity or absence of initial woody vegetation at the time when dam started working.

  4. An evaluation of fish behavior upstream of the water temperature control tower at Cougar Dam, Oregon, using acoustic cameras, 2013

    USGS Publications Warehouse

    Adams, Noah S.; Smith, Collin; Plumb, John M.; Hansen, Gabriel S.; Beeman, John W.

    2015-07-06

    This report describes the initial year of a 2-year study to determine the feasibility of using acoustic cameras to monitor fish movements to help inform decisions about fish passage at Cougar Dam near Springfield, Oregon. Specifically, we used acoustic cameras to measure fish presence, travel speed, and direction adjacent to the water temperature control tower in the forebay of Cougar Dam during the spring (May, June, and July) and fall (September, October, and November) of 2013. Cougar Dam is a high-head flood-control dam, and the water temperature control tower enables depth-specific water withdrawals to facilitate adjustment of water temperatures released downstream of the dam. The acoustic cameras were positioned at the upstream entrance of the tower to monitor free-ranging subyearling and yearling-size juvenile Chinook salmon (Oncorhynchus tshawytscha). Because of the large size discrepancy, we could distinguish juvenile Chinook salmon from their predators, which enabled us to measure predators and prey in areas adjacent to the entrance of the tower. We used linear models to quantify and assess operational and environmental factors—such as time of day, discharge, and water temperature—that may influence juvenile Chinook salmon movements within the beam of the acoustic cameras. Although extensive milling behavior of fish near the structure may have masked directed movement of fish and added unpredictability to fish movement models, the acoustic-camera technology enabled us to ascertain the general behavior of discrete size classes of fish. Fish travel speed, direction of travel, and counts of fish moving toward the water temperature control tower primarily were influenced by the amount of water being discharged through the dam.

  5. The fluvial sediment budget of a dammed river (upper Muga, southern Pyrenees)

    NASA Astrophysics Data System (ADS)

    Piqué, G.; Batalla, R. J.; López, R.; Sabater, S.

    2017-09-01

    Many rivers in the Mediterranean region are regulated for urban and agricultural purposes. Reservoir presence and operation results in flow alteration and sediment discontinuity, altering the longitudinal structure of the fluvial system. This study presents a 3-year sediment budget of a highly dammed Mediterranean river (the Muga, southern Pyrenees), which has experienced flow regulation since the 1969 owing to a 61-hm3 reservoir. Flow discharge and suspended sediment concentration were monitored immediately upstream and downstream from the reservoir, whereas bedload transport was estimated by means of bedload formulae and estimated from regional data. Results show how the dam modifies river flow, reducing the magnitude of floods and shortening its duration. At the same time, duration of low flows increases. The downstream flow regime follows reservoir releases that are mostly driven by the irrigation needs in the lowlands. Likewise, suspended sediment and bedload transport are shown to be notably affected by the dam. Sediment transport upstream was mainly associated with floods and was therefore concentrated in short periods of time (i.e., > 90% of the sediment load occurred in < 1% of the time). Downstream from the dam, sediments were transported more constantly (i.e., 90% of the load was carried during 50% of the time). Total sediment load upstream from the dam equalled 23,074 t, while downstream it was < 1000 t. Upstream, sediment load was equally distributed between suspension and bedload (i.e., 10,278 and 12,796 t respectively), whereas suspension dominated sediment transport downstream. More than 95% of the sediments transported from the upstream basins were trapped in the reservoir, a fact that explains the sediment deficit and the river bed armouring observed downstream. Overall, the dam disrupted the natural water and sediment fluxes, generating a highly modified environment downstream. Below the dam, the whole ecosystem shifted to stable conditions owing to the reduction of water and sediment loads.

  6. Forecasting the remaining reservoir capacity in the Laurentian Great Lakes watershed

    NASA Astrophysics Data System (ADS)

    Alighalehbabakhani, Fatemeh; Miller, Carol J.; Baskaran, Mark; Selegean, James P.; Barkach, John H.; Dahl, Travis; Abkenar, Seyed Mohsen Sadatiyan

    2017-12-01

    Sediment accumulation behind a dam is a significant factor in reservoir operation and watershed management. There are many dams located within the Laurentian Great Lakes watershed whose operations have been adversely affected by excessive reservoir sedimentation. Reservoir sedimentation effects include reduction of flood control capability and limitations to both water supply withdrawals and power generation due to reduced reservoir storage. In this research, the sediment accumulation rates of twelve reservoirs within the Great Lakes watershed were evaluated using the Soil and Water Assessment Tool (SWAT). The estimated sediment accumulation rates by SWAT were compared to estimates relying on radionuclide dating of sediment cores and bathymetric survey methods. Based on the sediment accumulation rate, the remaining reservoir capacity for each study site was estimated. Evaluation of the anthropogenic impacts including land use change and dam construction on the sediment yield were assessed in this research. The regression analysis was done on the current and pre-European settlement sediment yield for the modeled watersheds to predict the current and natural sediment yield in un-modeled watersheds. These eleven watersheds are in the state of Indiana, Michigan, Ohio, New York, and Wisconsin.

  7. National Dam Safety Program. No Name 165 (Crystal Lake Dam) (MO 10580), Missouri - Kansas City Basin, Jackson County, Missouri. Phase I Inspection Report.

    DTIC Science & Technology

    1978-07-01

    For NTIS GRA&I DTIC TAB >0 Unannounced [D Just ification- D T C ELECTE By Distribution/ NOV 20 1981 Avail and/orS Availabilit CodesD=-Dist Spca D NO...Hutton, Engineering Geologist. Impoundment of water began in 1970. h. Normal Operating Procedure. Normal rainfall, runoff, transpir- ation, and...evaporation all combine to maintain a relatively stable water surface elevation. 1.3 PERTINENT DATA a. Drainage Area - 9,900 acres of which approximately 15

  8. Major Rehabilitation Effort, Mississippi River, Locks and Dams 2-22: Illinois Waterway from LA Grange to Lockport Locks and Dams: Iowa, Illinois, Missouri, Minnesota and Wisconsin.

    DTIC Science & Technology

    1989-03-01

    provided helper boats are a viable, but expensive, alternative Bow boats or bow thrusters are not likely to be put into wide service on the UMRS Improved... thrusters are even smaller, lower-horsepower units, which provide the same basic function as bowboats, but cannot be independently operated and require...other mammals depend on these areas. Marsh vegetation produce and sustain higher numbers of wildlife than any other land category. 3.10 and and - Sand

  9. 18. Photographic copy of photograph. (Source: U.S. Department of Interior. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1925. Vol. I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. SACATON DAM AND BRIDGE, SOUTH END SLUICEWAY, INTAKE CANAL BRIDGE, OPERATING HOUSE, AND MAIN BRIDGE, 6/18/25 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ

  10. Assessing survival of Mid-Columbia River released juvenile salmonids at McNary Dam, Washington, 2008-09

    USGS Publications Warehouse

    Evans, Scott D.; Walker, Christopher E.; Brewer, Scott J.; Adams, Noah S.

    2010-01-01

    Few studies have evaluated survival of juvenile salmon over long river reaches in the Columbia River and information regarding the survival of sockeye salmon at lower Columbia River dams is lacking. To address these information gaps, the U.S. Geological Survey was contracted by the U.S. Army Corps of Engineers to evaluate the possibility of using tagged fish released in the Mid-Columbia River to assess passage and survival at and downstream of McNary Dam. Using the acoustic telemetry systems already in place for a passage and survival study at McNary Dam, fish released from the tailraces of Wells, Rocky Reach, Rock Island, Wanapum, and Priest Rapids Dams were detected at McNary Dam and at the subsequent downstream arrays. These data were used to generate route-specific survival probabilities using single-release models from fish released in the Mid-Columbia River. We document trends in passage and survival probabilities at McNary Dam for yearling Chinook and sockeye salmon and juvenile steelhead released during studies in the Mid-Columbia River. Trends in the survival and passage of these juvenile salmonid species are presented and discussed. However, comparisons made across years and between study groups are not possible because of differences in the source of the test fish, the type of acoustic tags used, the absence of the use of passive integrated transponder tags in some of the release groups, differences in tagging and release protocols, annual differences in dam operations and configurations, differences in how the survival models were constructed (that is, number of routes that could be estimated given the number of fish detected), and the number and length of reaches included in the analysis (downstream reach length and arrays). Despite these differences, the data we present offer a unique opportunity to examine the migration behavior and survival of a group of fish that otherwise would not be studied. This is particularly true for sockeye salmon because little information is available about their survival as they pass hydroelectric dams in the lower Columbia River. Collecting information on fish released in the Mid-Columbia River, as well as on fish released 8 kilometers upstream of McNary Dam, allowed us to evaluate similarities and differences in passage and survival probabilities. In general, juvenile salmonids released in the Mid-Columbia River and detected at and downstream of McNary Dam showed trends in passage and survival probabilities that were similar to fish released 8 kilometers upstream of McNary Dam. This suggests that increased migration time or length of migration had little effect on behavior and survival of Mid-Columbia River released juvenile salmonids detected at McNary Dam.

  11. Relationship between Dongting Lake and surrounding rivers under the operation of the Three Gorges Reservoir, China.

    PubMed

    Zhan, Lucheng; Chen, Jiansheng; Zhang, Shiyin; Huang, Dewen; Li, Ling

    2015-01-01

    The natural flow properties of the Yangtze River have been changed completely following the construction of the Three Gorges Dam. The dam's operation has affected the resources and environment in the middle and lower reaches of the Yangtze River, changing the hydrological conditions and ecological environment of the Dongting Lake. During three different dispatching periods of the reservoir, we took triplicate samples of the river and lake water. All the samples were analysed for δ(2)H and δ(18)O to determine the relationship between the lake and the Yangtze River (and other rivers), and to evaluate objectively the influence of the dam's operation on the lake. During the period of water-supply dispatch, the Four Rivers and Miluo River are the main recharge sources of the lake. During the flood-storage dispatching period, the Dongting Lake is recharged largely by the Three Outlets and the Four Rivers, whereas during the period of water-storage dispatch, most of the lake's water originates from the Miluo, Xiang, Zi, and Yuan rivers. Although the Yangtze River only contributes significantly to the lake's recharge through the Three Outlets during the flood-storage dispatching period, the lake discharges large amounts of water into the Yangtze River during all three periods. Through the operation of the reservoir, it should be ensured that the water level of the Dongting Lake is not too low during the dry season, nor too high during the wet season, thus preventing the lake region from future flood and drought disasters.

  12. Potential of modified flow-release rules for Kingsley Dam in meeting crane habitat requirements, Platte River, Nebraska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shen, H.W.; Hiew, K.L.; Loubser, E.

    1985-11-01

    The Whooping Crane, an endangered species, uses the Platte River downstream from Overton, Nebraska in its migratory route. Maintenance of favorable habitat conditions required by law may mean restrictions on development and management of Colorado's entitled water in the South Platte River. The project investigated meeting crane habitat flow requirements by alternative plans for flow releases through Kingsley Dam (North Platte River) and Narrows Dam (a proposed project on the South Platte River). The analysis is based on mean monthly flow of the past 39 years. Irrigation releases were held firm, hydroelectric power production was maximized, and flows available tomore » meet habitat requirements were determined. A simulation model was developed to model the operation of the North Platte and South Platte Rivers.« less

  13. Seasonal And Intra-seasonal Hydrological Responses To Change In Climate Pattern And Small Dams of the Faga Watershed In Burkina-Faso

    NASA Astrophysics Data System (ADS)

    Mamounata, K.

    2015-12-01

    In response to the increasing demand for food linked to the substantial growth of population in Burkina Faso, irrigation has been widely used by the farming community to support agricultural production. Thus a promising option for water resources development in such a context is to increase the number of small dams. It is assumed that the great number of small dams may have effect on sub-basins' hydrological dynamic. This study aims to assess the seasonal and the intra-seasonal change in river basins hydrology with the case study of the Faga River sub-basin located in Burkina-Faso, West Africa, using Water Simulation Model (WaSiM). For this watershed the number of small dams is slightly very important (More than 60) and their impact on the watershed runoff has been estimated simultaneously with the change in climate pattern. The coefficient of variation for rainfall in this sub-basin from 1982 to 2010 is 0.097 and the stream flow presents a seasonal average of 25.58Km3 per month for the same period. The intra-seasonal climate variation for the same period is estimated at 0.087 in the scenario where any dam has not been considered. Results based on simulation including the five important dams over the sub-basin show that the overall effect of small dams is on average a 20.76% in runoff. Projections using the Representative Concentration Pathways (RCP) 4.5 and 8.5 climate scenarios with increase of 25% of dams' number show a probable decrease of about 29.54% and 35.25% of the average during the next fifty years runoff. The study findings show that small dams reduce significantly the runoff from their watershed and the uncertainties related to the sustainability of the resource seems to be increasing during the same period. Therefore, despite the very large number of water storage infrastructures, reservoirs operating strategies have to be achieved for water sustainability within the Faga sub-basin.

  14. Optimization of hard red spring wheat milling for whole wheat flour production

    USDA-ARS?s Scientific Manuscript database

    The objective of this study was to determine the effect of seed moisture content (10 to 16%) and rotor speed (6,000 to 15,000 rpm) of a centrifugal mill on quality of whole wheat flour (WWF) and subsequent baking quality. Particle size distribution, flour temperature, flour moisture, and starch dam...

  15. Refraction tomography mapping of near-surface dipping layers using landstreamer data at East Canyon Dam, Utah

    USGS Publications Warehouse

    Ivanov, J.; Miller, R.D.; Markiewicz, R.D.; Xia, J.

    2008-01-01

    We apply the P-wave refraction-tomography method to seismic data collected with a landstreamer. Refraction-tomography inversion solutions were determined using regularization parameters that provided the most realistic near-surface solutions that best matched the dipping layer structure of nearby outcrops. A reasonably well matched solution was obtained using an unusual set of optimal regularization parameters. In comparison, the use of conventional regularization parameters did not provide as realistic results. Thus, we consider that even if there is only qualitative a-priori information about a site (i.e., visual) - in the case of the East Canyon Dam, Utah - it might be possible to minimize the refraction nonuniqueness by estimating the most appropriate regularization parameters.

  16. Fractional order creep model for dam concrete considering degree of hydration

    NASA Astrophysics Data System (ADS)

    Huang, Yaoying; Xiao, Lei; Bao, Tengfei; Liu, Yu

    2018-05-01

    Concrete is a material that is an intermediate between an ideal solid and an ideal fluid. The creep of concrete is related not only to the loading age and duration, but also to its temperature and temperature history. Fractional order calculus is a powerful tool for solving physical mechanics modeling problems. Using a software element based on the generalized Kelvin model, a fractional order creep model of concrete considering the loading age and duration is established. Then, the hydration rate of cement is considered in terms of the degree of hydration, and the fractional order creep model of concrete considering the degree of hydration is established. Moreover, uniaxial tensile creep tests of dam concrete under different curing temperatures were conducted, and the results were combined with the creep test data and complex optimization method to optimize the parameters of a new creep model. The results show that the fractional tensile creep model based on hydration degree can better describe the tensile creep properties of concrete, and this model involves fewer parameters than the 8-parameter model.

  17. Optimization of planting pattern plan in Logung irrigation area using linear program

    NASA Astrophysics Data System (ADS)

    Wardoyo, Wasis; Setyono

    2018-03-01

    Logung irrigation area is located in Kudus Regency, Central Java Province, Indonesia. Irrigation area with 2810 Ha of extent is getting water supply from Logung dam. Yet, the utilization of water at Logung dam is not optimal and the distribution of water is still not evenly distributed. Therefore, this study will discuss about the optimization of irrigation water utilization based on the beginning of plant season. This optimization begins with the analysis of hydrology, climatology and river discharge in order to determine the irrigation water needs. After determining irrigation water needs, six alternatives of planting patterns with the different early planting periods, i.e. 1st November, 2nd November, 3rd November, 1st December, 2nd December, and 3rd December with the planting pattern of rice-secondary crop-sugarcane is introduced. It is continued by the analysis of water distribution conducted using linear program assisted by POM-Quantity method for Windows 3 with the reliable discharge limit and the available land area. Output of this calculation are to determine the land area that can be planted based on the type of plant and growing season, and to obtaine the profits of harvest yields. Based on the optimum area of each plant species with 6 alternatives, the most optimum area was obtained at the early planting periods on 3rd December with the production profit of Rp 113.397.338.854,- with the planting pattern of rice / beans / sugarcane-rice / beans / sugarcane-beans / sugarcane.

  18. Spokane Tribal Hatchery, 2004 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peone, Tim L.

    2005-03-01

    Due to the construction and operation of Grand Coulee Dam (1939), anadromous salmon have been eradicated and resident fish populations permanently altered in the upper Columbia River region. Federal and private hydropower dam operations throughout the Columbia River system severely limits indigenous fish populations in the upper Columbia. Artificial production has been determined appropriate for supporting a harvestable fishery for kokanee salmon (Oncorhynchus nerka) and rainbow trout (Oncorhynchus mykiss) in Lake Roosevelt and Banks Lake (Grand Coulee Dam impoundments). A collaborative multi-agency artificial production program for the Lake Roosevelt and Banks Lake fisheries exists consisting of the Spokane Tribal Hatchery,more » Sherman Creek Hatchery, Ford Trout Hatchery and the Lake Roosevelt Kokanee and Rainbow Trout Net Pen Rearing Projects. These projects operate complementary of one another to target an annual release of 1 million yearling kokanee and 500,000 yearling rainbow trout for Lake Roosevelt and 1.4 million kokanee fry/fingerlings for Banks Lake. Fish produced by this project in 2004 to meet collective fish production and release goals included: 1,655,722 kokanee fingerlings, 537,783 rainbow trout fingerlings and 507,660 kokanee yearlings. Kokanee yearlings were adipose fin clipped before release. Stock composition consisted of Lake Whatcom kokanee, 50:50 diploid-triploid Spokane Trout Hatchery (McCloud River) rainbow trout and Phalon Lake red-band rainbow trout. All kokanee were marked with either thermal, oxytetracyline or fin clips prior to release. Preliminary 2004 Lake Roosevelt fisheries investigations indicate hatchery/net pen stocking significantly contributed to harvestable rainbow trout and kokanee salmon fisheries. An increase in kokanee harvest was primarily owing to new release strategies. Walleye predation, early maturity and entrainment through Grand Coulee Dam continues to have a negative impact on adult kokanee returns and limits the success of hatchery/net pen stocking on the number of harvestable fish. Recommendations for future hatchery/net pen operations include use of stocks compatible or native to the upper Columbia River, continue hatchery-rearing practices to reduce precocity rates of kokanee and continue new kokanee stocking strategies associated with increased kokanee harvest rates.« less

  19. Sediment Transport in the Bill Williams River and Turbidity in Lake Havasu During and Following Two High Releases from Alamo Dam, Arizona, in 2005 and 2006

    USGS Publications Warehouse

    Wiele, Stephen M.; Hart, Robert J.; Darling, Hugh L.; Hautzinger, Andrew B.

    2009-01-01

    Discharges higher than are typically released from Alamo Dam in west-central Arizona were planned and released in 2005, 2006, 2007, and 2008 to study the effects of these releases on the Bill Williams River and Lake Havasu, into which the river debouches. Sediment concentrations and water discharges were measured in the Bill Williams River, and turbidity, temperature, and dissolved oxygen were measured in Lake Havasu during and after experimental releases in 2005 and 2006 from Alamo Dam. Data from such releases will support ongoing ecological studies, improve environmentally sensitive management of the river corridor, and support the development of a predictive relationship between the operation of Alamo Dam and downstream flows and their impact on Lake Havasu and the Colorado River. Elevated discharges in the Bill Williams River mobilize more sediment than during more typical dam operation and can generate a turbidity plume in Lake Havasu. The intakes for the Central Arizona Project, which transfers Colorado River water to central and southern Arizona, are near the mouth of the Bill Williams River. Measurement of the turbidity and the development of the plume over time consequently were important components of the study. In this report, the measurements of suspended sediment concentration and discharges in the Bill Williams River and of turbidity in Lake Havasu are presented along with calculations of silt and sand loads in the Bill Williams River. Sediment concentrations were varied and likely dependent on a variable supply. Sediment loads were calculated at the mouth of the river and near Planet, about 10 km upstream from the mouth for the 2005 release, and they indicate that a net increase in transport of silt and a net decrease in the transport of sand occurred in the reach between the two sites.

  20. Effects of flow alterations on trout, angling, and recreation in the Chattahoochee River between Buford Dam and Peachtree Creek

    USGS Publications Warehouse

    Nestler, John M.; Milhouse, Robert T.; Troxel, Jay; Fritschen, Janet A.

    1985-01-01

    In 1974 county governments in the Atlanta vicinity realized that demands on the Chattahoochee River for water supply plus the streamflow required for water quality nearly equaled the minimum flow in the river. Increased demands for water supply in the following years could not be supplied under the then existing flow regime in the river. In response to the anticipated shortage of water, the Atlanta Regional Commission, a multicounty agency responsible for comprehensive regional planning in the Atlanta region, was contracted to prepare water demand projections to the year 2010 and identify alternatives for meeting projected water demands. The results of this study are published in an extensive final report, the Metropolitan Atlanta Area Water Resources Management Study (1981). Requests for copies should be directed to the District Engineer, Savannah District. Many of the identified alternatives to increase future water supply for the Atlanta area would result in modifications to the present flow regime within the Chattahoochee River between Buford Dam (river mile 348.3) and its confluence with Peachtree Creek (river mile 300.5). The present preferred alternative is construction of a reregulation dam at about river mile 342. The proposed reregulation dam would release a much more constant flow than the peaking flows presently released from Buford Dam (generally, a maximum release of approximately 9000 cfs or minimum release of about 550 cfs) by storing the generation releases from Buford Dam for gradual release during non-generation periods. The anticipated minimum release from the rereg dam would he approximately 1U5U cfs (based on contractual obligations to the Southeast Power Administration to supply a minimum of 11 hours of peaking power per week from Buford Dam). The average annual release from the proposed reregulation dam into the Chattahoochee River would be approximately 2000 cfs (based on USGS flow records) and the median release would he approximately 1500 cfs (value obtained from Savannah District). The proposed reregulation dam would have sufficient storage to provide some opportunity for flow management to optimize uses other than water supply and water quality. Flow modifications (and resultant water quality changes) within this reach of the Chattahoochee River to meet increased demands for water supply may have an effect on other beneficial uses of this important natural resource. In addition to supplying a significant proportion of the water supply for metropolitan Atlanta and providing for water quality, the Chattahoochee River also is used extensively for recreation and supports a valuable trout fishery. Altered flows in the channel to meet water supply needs may have an impact on river recreation and trout habitat.

  1. 11. INTERIOR VIEW OF OPERATING HOUSE NO. 4, SHOWING WORM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. INTERIOR VIEW OF OPERATING HOUSE NO. 4, SHOWING WORM WHEEL GEAR ASSEMBLY, ORIGINAL 20 HP EAST HOIST MOTOR, AND CONTROL GATES 7 AND 8 HAND BRAKES, WITH MOTOR SELECTOR SWITCH, MOTOR STARTING SWITCH, AND OIL CIRCUIT BREAKER IN BACKGROUND - Long Lake Hydroelectric Plant, Spillway Dam, Spanning Spokane River, Ford, Stevens County, WA

  2. Walla Walla River Fish Passage Operations Program, 2003-2004 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bronson, James P.

    2004-12-01

    In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. The migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survivalmore » of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage criteria and passage and trapping facility design and operation. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. During the 2003-2004 project year, there were 379 adult summer steelhead (Oncorhynchus mykiss), 36 adult bull trout (Salvelinus confluentus); 108 adult and 3 jack spring chinook (O. tshawytscha) enumerated at the Nursery Bridge Dam fishway video counting window between December 21, 2003, and June 30, 2004. Summer steelhead and spring chinook were observed moving upstream while bull trout were observed moving both upstream and downstream of the facility. In addition, the old ladder trap was operated by the WWBNPME project in order to radio tag spring chinook adults. A total of 2 adult summer steelhead, 4 bull trout, and 23 adult spring chinook were enumerated at the west ladder at Nursery Bridge Dam during the trapping operations between May 6 and May 23, 2004. Operation of the Little Walla Walla River juvenile trap for trap and haul purposes was not necessary this year. The project transported adult spring chinook from Threemile Dam to the South Fork Walla Walla Brood Holding Facility. A total of 239 spring chinook were outplanted in August for natural spawning in the basin.« less

  3. Effects of flood control and other reservoir operations on the water quality of the lower Roanoke River, North Carolina

    USGS Publications Warehouse

    Garcia, Ana Maria

    2012-01-01

    The Roanoke River is an important natural resource for North Carolina, Virginia, and the Nation. Flood plains of the lower Roanoke River, which extend from Roanoke Rapids Dam to Batchelor Bay near Albemarle Sound, support a large and diverse population of nesting birds, waterfowl, freshwater and anadromous fish, and other wildlife, including threatened and endangered species. The flow regime of the lower Roanoke River is affected by a number of factors, including flood-management operations at the upstream John H. Kerr Dam and Reservoir. A three-dimensional, numerical water-quality model was developed to explore links between upstream flows and downstream water quality, specifically in-stream dissolved-oxygen dynamics. Calibration of the hydrodynamics and dissolved-oxygen concentrations emphasized the effect that flood-plain drainage has on water and oxygen levels, especially at locations more than 40 kilometers away from the Roanoke Rapids Dam. Model hydrodynamics were calibrated at three locations on the lower Roanoke River, yielding coefficients of determination between 0.5 and 0.9. Dissolved-oxygen concentrations were calibrated at the same sites, and coefficients of determination ranged between 0.6 and 0.8. The model has been used to quantify relations among river flow, flood-plain water level, and in-stream dissolved-oxygen concentrations in support of management of operations of the John H. Kerr Dam, which affects overall flows in the lower Roanoke River. Scenarios have been developed to mitigate the negative effects that timing, duration, and extent of flood-plain inundation may have on vegetation, wildlife, and fisheries in the lower Roanoke River corridor. Under specific scenarios, the model predicted that mean dissolved-oxygen concentrations could be increased by 15 percent by flow-release schedules that minimize the drainage of anoxic flood-plain waters. The model provides a tool for water-quality managers that can help identify options that improve water quality and protect the aquatic habitat of the Roanoke River.

  4. Development and Application of a Taiwan Domestic Generalized Water Supply Model

    NASA Astrophysics Data System (ADS)

    Ho, C. C.; Chang, L. C.

    2016-12-01

    Water allocation in Taiwan is more complicated than other countries because high river turbidity caused by rainstorm, reservoir management governed by different organization and conjunctive use of inter-basin reservoirs and dams. Those properties cause water resource planners need make extra effort on developing customized model to simulate the impact of water supply strategies on water resources. Hence, the study develops a Generalized Water Supply Model (GWSM) to analysis Multi-reservoirs water allocation in Taiwan for advancing the planning process. The model has following functions: (1) considering reservoirs operating rule curve. (2) considering the rule of multi-reservoir operation. Such as setting supply priority of different reservoirs or using "index balance" rule. (3) considering optimal hydroelectric power operation. (4) estimating the impact of high river turbidity on water supply. (5) considering the supply priority of different water use. (6) considering irrigation supply under special constraint. Such as the maximum irrigation supply is subject to natural inflow without reservoir storage. (7) considering two-way conduit transport. (8) considering environmental flow reservation. Conjunctive use Taan and Dajia Rivers was selected to demonstrate the ability of GWSM. The results also can be provided to different authorities to realize the impact of different strategies and that is good for negotiation and reaching a consensus.

  5. Large-scale flow experiments for managing river systems

    USGS Publications Warehouse

    Konrad, Christopher P.; Olden, Julian D.; Lytle, David A.; Melis, Theodore S.; Schmidt, John C.; Bray, Erin N.; Freeman, Mary C.; Gido, Keith B.; Hemphill, Nina P.; Kennard, Mark J.; McMullen, Laura E.; Mims, Meryl C.; Pyron, Mark; Robinson, Christopher T.; Williams, John G.

    2011-01-01

    Experimental manipulations of streamflow have been used globally in recent decades to mitigate the impacts of dam operations on river systems. Rivers are challenging subjects for experimentation, because they are open systems that cannot be isolated from their social context. We identify principles to address the challenges of conducting effective large-scale flow experiments. Flow experiments have both scientific and social value when they help to resolve specific questions about the ecological action of flow with a clear nexus to water policies and decisions. Water managers must integrate new information into operating policies for large-scale experiments to be effective. Modeling and monitoring can be integrated with experiments to analyze long-term ecological responses. Experimental design should include spatially extensive observations and well-defined, repeated treatments. Large-scale flow manipulations are only a part of dam operations that affect river systems. Scientists can ensure that experimental manipulations continue to be a valuable approach for the scientifically based management of river systems.

  6. Umatilla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bronson, James P.; Loffink, Ken; Duke, Bill

    Threemile Falls Dam (Threemile Dam), located near the town of Umatilla, is the major collection and counting point for adult salmonids returning to the Umatilla River. Returning salmon and steelhead were enumerated at Threemile Dam from June 7, 2007 to August 11, 2008. A total of 3,133 summer steelhead (Oncorhynchus mykiss); 1,487 adult, 1,067 jack, and 999 subjack fall Chinook (O. tshawytscha); 5,140 adult and 150 jack coho (O. kisutch); and 2,009 adult, 517 jack, and 128 subjack spring Chinook (O. tshawytscha) were counted. All fish were enumerated at the east bank facility. Of the fish counted, 1,442 summer steelheadmore » and 88 adult and 84 jack spring Chinook were hauled upstream from Threemile Dam. There were 1,497 summer steelhead; 609 adult, 1,018 jack and 979 subjack fall Chinook; 5,036 adult and 144 jack coho; and 1,117 adult, 386 jack and 125 subjack spring Chinook either released at, or allowed to volitionally migrate past, Threemile Dam. Also, 110 summer steelhead; 878 adult and 43 jack fall Chinook; and 560 adult and 28 jack spring Chinook were collected as broodstock for the Umatilla River hatchery program. In addition, there were 241 adult and 15 jack spring Chinook collected at Threemile Dam for outplanting in the South Fork Walla Walla River and Mill Cr, a tributary of the mainstem Walla Walla River. The Westland Canal juvenile facility (Westland), located near the town of Echo at river mile (RM) 27, is the major collection point for out-migrating juvenile salmonids and steelhead kelts. The canal was open for 158 days between February 11, 2008 and July 18, 2008. During that period, fish were bypassed back to the river 150 days and were trapped 6 days. There were also 2 days when fish were directed into and held in the canal forebay between the time the bypass was closed and the trap opened. An estimated 64 pounds of fish were transported from the Westland trapping facility. Approximately 25.8% of the fish transported were salmonids. In addition, one adult Pacific lamprey was trapped and released above the Westland ladder this year. The Threemile Dam west bank juvenile bypass was opened on March 11, 2008 in conjunction with water deliveries and continued through the summer. West Extension Irrigation District (WEID) discontinued diverting live flow on June 24, 2008 but the bypass remained open throughout the project year. The juvenile trap was not operated this project year.« less

  7. Erosion monitoring along the Coosa River below Logan Martin Dam near Vincent, Alabama, using terrestrial light detection and ranging (T-LiDAR) technology

    USGS Publications Warehouse

    Kimbrow, Dustin R.; Lee, Kathryn G.

    2013-01-01

    Alabama Power operates a series of dams on the Coosa River in east central Alabama. These dams form six reservoirs that provide power generation, flood control, recreation, economic opportunity, and fish and wildlife habitats to the region. The Logan Martin Reservoir is located approximately 45 kilometers east of Birmingham and borders Saint Clair and Talladega Counties. Discharges below the reservoir are controlled by power generation at Logan Martin Dam, and there has been an ongoing concern about the stability of the streambanks downstream of the dam. The U.S. Geological Survey, in cooperation with Alabama Power conducted a scientific investigation of the geomorphic conditions of a 115-meter length of streambank along the Coosa River by using tripod-mounted terrestrial light detection and ranging technology. Two surveys were conducted before and after the winter flood season of 2010 to determine the extent and magnitude of geomorphic change. A comparison of the terrestrial light detection and ranging datasets indicated that approximately 40 cubic meters of material had been eroded from the upstream section of the study area. The terrestrial light detection and ranging data included in this report consist of electronic point cloud files containing several million georeferenced data points, as well as a surface model measuring changes between scans.

  8. The State of the Colorado River Ecosystem in Grand Canyon: A Report of the Grand Canyon Monitoring and Research Center 1991-2004

    USGS Publications Warehouse

    Gloss, Steven P.; Lovich, Jeffrey E.; Melis, Theodore S.

    2005-01-01

    This report is an important milestone in the effort by the Secretary of the Interior to implement the Grand Canyon Protection Act of 1992 (GCPA; title XVIII, secs. 1801-1809, of Public Law 102-575), the most recent authorizing legislation for Federal efforts to protect resources downstream from Glen Canyon Dam. The chapters that follow are intended to provide decision makers and the American public with relevant scientific information about the status and recent trends of the natural, cultural, and recreational resources of those portions of Grand Canyon National Park and Glen Canyon National Recreation Area affected by Glen Canyon Dam operations. Glen Canyon Dam is one of the last major dams that was built on the Colorado River and is located just south of the Arizona-Utah border in the lower reaches of Glen Canyon National Recreation Area, approximately 15 mi (24 km) upriver from Grand Canyon National Park (fig. 1). The information presented here is a product of the Glen Canyon Dam Adaptive Management Program (GCDAMP), a federally authorized initiative to ensure that the primary mandate of the GCPA is met through advances in information and resource management. The U.S. Geological Survey`s (USGS) Grand Canyon Monitoring and Research Center (GCMRC) has responsibility for the scientific monitoring and research efforts for the program, including the preparation of reports such as this one.

  9. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 4, Appendixes B-D

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced bymore » Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.« less

  10. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 2, Sections 1-16

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced bymore » Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.« less

  11. A Markov chain analysis of the movements of juvenile salmonids, including sockeye salmon, in the forebay of McNary Dam, Washington and Oregon, 2006-09

    USGS Publications Warehouse

    Adams, Noah S.; Hatton, Tyson W.

    2012-01-01

    Passage and survival data were collected at McNary Dam between 2006 and 2009. These data have provided critical information for resource managers to implement structural and operational changes designed to improve the survival of juvenile salmonids as they migrate past the dam. Much of the valuable information collected at McNary Dam was in the form of three-dimensional (hereafter referred to as 3-D) tracks of fish movements in the forebay. These data depicted the behavior of multiple species (in three dimensions) during different diel periods, spill conditions, powerhouse operations, and testing of the surface bypass structures (temporary spillway weirs; TSWs). One of the challenges in reporting 3-D results is presenting the information in a manner that allows interested parties to summarize the behavior of many fish over many different conditions across multiple years. To accomplish this, we used a Markov chain analysis to characterize fish movement patterns in the forebay of McNary Dam. The Markov chain analysis allowed us to numerically summarize the behavior of fish in the forebay. This report is the second report published in 2012 that uses this analytical method. The first report included only fish released as part of the annual studies conducted at McNary Dam. This second report includes sockeye salmon that were released as part of studies conducted by the Chelan and Grant County Public Utility Districts at mid-Columbia River dams. The studies conducted in the mid-Columbia used the same transmitters as were used for McNary Dam studies, but transmitter pulse width was different between studies. Additionally, no passive integrated transponder tags were implanted in sockeye salmon. Differences in transmitter pulse width resulted in lower detection probabilities for sockeye salmon at McNary Dam. The absence of passive integrated transponder tags prevented us from determining if fish passed the powerhouse through the juvenile bypass system (JBS) or turbines. To facilitate comparison among species in this report, we combined JBS and turbine passage for yearling Chinook salmon, steelhead, and subyearling Chinook salmon even though we were able to differentiate between passage through the JBS or turbines for these three species. Information on passage proportions through the JBS and turbines can be found in the first report. Numerically summarizing the behavior of juvenile salmonids in the forebay of McNary Dam using the Markov chain analysis allowed us to confirm what had been previously summarized using visualization software. For example, within the powerhouse region, passage proportions among the three powerhouse areas were often greater in the southern and middle areas of the powerhouse compared to the northern area of the powerhouse for yearling and subyearling Chinook salmon. The opposite generally was observed for steelhead. The results of this analysis also allowed us to confirm and quantify the extent of milling behavior that was observed for steelhead. For fish that were first detected in the powerhouse region, less than 0.10 of the steelhead, on average, passed within each of the powerhouse areas. Instead, steelhead transitioned to adjoining areas in the spillway before passing the dam. In comparison, greater than 0.20 of the Chinook salmon passed within each of the powerhouse areas. Less milling behavior was observed for all species for fish that first approached the spillway. Compared to the powerhouse areas, a higher proportion of fish, regardless of species, passed the spillway areas and fewer transitioned to adjoining areas in the powerhouse. In addition to quantifying what had been previously speculated about the behavior of fish in the forebay of McNary Dam, the Markov chain analysis refined our understanding of how fish behavior and passage can be influenced by changes to the operations and structure of McNary Dam. For example, the addition of TSWs to the spillway area clearly influenced the passage of fish. Previous results have been reported showing that TSWs increased passage through non-turbine routes and the fish-track videos indicated, in general, how fish behaved before passing the TSWs. However, the analysis presented in this report allowed us to better understand how fish transitioned across the face of the dam before passing the TSWs and resulted in a quantitative way to measure the effect of moving the location of the TSWs from year to year. Installation of the TSWs in bays 22 and 20 clearly increased passage proportions through the southern one-third of the spillway area for all species, most significantly for steelhead. When the TSWs were moved to bays 19 and 20 in 2008, overall passage through the southern one-third of the spillway remained higher than 2006, but decreased from what was observed in 2007. Shifting the TSWs to the north decreased the proportion of fish passing through the TSWs and increased the number of fish that transitioned to adjoining areas before passing the dam. Perhaps the most interesting new information to come out of the two-step Markov chain analysis relates to how the performance of the TSWs was influenced by their proximity to the powerhouse. During 2007, the highest proportion of fish passing through TSW 22 was for fish that transitioned from the powerhouse area. In contrast, a relatively low proportion of fish passed through TSW 20 after coming from the powerhouse area. Instead, the proportion of fish that passed TSW 20 after coming from the northern part of the spillway was twice as high as the proportion of fish that passed through TSW 20 after coming from the powerhouse. During 2008, the TSW in bay 22 was moved to bay 19, leaving the TSW in bay 20 as the one closest to the powerhouse. As was the case when a TSW was located in bay 22, the proportion of fish passing through TSW 20 after coming from the powerhouse was higher than the proportion of fish passing TSW 20 after coming from the northern part of the spillway. Passage proportions for fish passing through TSW 19, the farthest north of the two TSWs during 2008, was higher for fish that came from the northern part of the spillway compared to the proportion of fish that passed through TSW 19 after coming from the powerhouse. The Markov chain analysis provided a mathematical way to characterize fish behavior in the forebay of McNary Dam and helped refine our understanding of how fish movements were influenced by operational and structural changes at the dam. The numerical information used to quantify the behavior of fish also can be used to construct simulations to examine how proposed fish passage structures might influence passage of juvenile salmonids. To demonstrate this, we used the results of the Markov chain analysis to examine how a virtual fish collector located in the center of the powerhouse might influence passage of juvenile salmonids at McNary Dam.

  12. Catchment Area Treatment (CAT) Plan and Crop Area Optimization for Integrated Management in a Water Resource Project

    NASA Astrophysics Data System (ADS)

    Jaiswal, R. K.; Thomas, T.; Galkate, R. V.; Ghosh, N. C.; Singh, S.

    2013-09-01

    A scientifically developed catchment area treatment (CAT) plan and optimized pattern of crop areas may be the key for sustainable development of water resource, profitability in agriculture and improvement of overall economy in drought affected Bundelkhand region of Madhya Pradesh (India). In this study, an attempt has been made to develop a CAT plan using spatial variation of geology, geomorphology, soil, drainage, land use in geographical information system for selection of soil and water conservation measures and crop area optimization using linear programming for maximization of return considering water availability, area affinity, fertilizers, social and market constraints in Benisagar reservoir project of Chhatarpur district (M.P.). The scientifically developed CAT plan based on overlaying of spatial information consists of 58 mechanical measure (49 boulder bunds, 1 check dam, 7 cully plug and 1 percolation tank), 2.60 km2 land for agro forestry, 2.08 km2 land for afforestation in Benisagar dam and 67 mechanical measures (45 boulder bunds and 22 gully plugs), 7.79 km2 land for agro forestry, 5.24 km2 land for afforestation in Beniganj weir catchment with various agronomic measures for agriculture areas. The linear programming has been used for optimization of crop areas in Benisagar command for sustainable development considering various scenarios of water availability, efficiencies, affinity and fertilizers availability in the command. Considering present supply condition of water, fertilizers, area affinity and making command self sufficient in most of crops, the net benefit can be increase to Rs. 1.93 crores from 41.70 km2 irrigable area in Benisagar command by optimizing cropping pattern and reducing losses during conveyance and application of water.

  13. Coupling large scale hydrologic-reservoir-hydraulic models for impact studies in data sparse regions

    NASA Astrophysics Data System (ADS)

    O'Loughlin, Fiachra; Neal, Jeff; Wagener, Thorsten; Bates, Paul; Freer, Jim; Woods, Ross; Pianosi, Francesca; Sheffied, Justin

    2017-04-01

    As hydraulic modelling moves to increasingly large spatial domains it has become essential to take reservoirs and their operations into account. Large-scale hydrological models have been including reservoirs for at least the past two decades, yet they cannot explicitly model the variations in spatial extent of reservoirs, and many reservoirs operations in hydrological models are not undertaken during the run-time operation. This requires a hydraulic model, yet to-date no continental scale hydraulic model has directly simulated reservoirs and their operations. In addition to the need to include reservoirs and their operations in hydraulic models as they move to global coverage, there is also a need to link such models to large scale hydrology models or land surface schemes. This is especially true for Africa where the number of river gauges has consistently declined since the middle of the twentieth century. In this study we address these two major issues by developing: 1) a coupling methodology for the VIC large-scale hydrological model and the LISFLOOD-FP hydraulic model, and 2) a reservoir module for the LISFLOOD-FP model, which currently includes four sets of reservoir operating rules taken from the major large-scale hydrological models. The Volta Basin, West Africa, was chosen to demonstrate the capability of the modelling framework as it is a large river basin ( 400,000 km2) and contains the largest man-made lake in terms of area (8,482 km2), Lake Volta, created by the Akosombo dam. Lake Volta also experiences a seasonal variation in water levels of between two and six metres that creates a dynamic shoreline. In this study, we first run our coupled VIC and LISFLOOD-FP model without explicitly modelling Lake Volta and then compare these results with those from model runs where the dam operations and Lake Volta are included. The results show that we are able to obtain variation in the Lake Volta water levels and that including the dam operations and Lake Volta has significant impacts on the water levels across the domain.

  14. National Program for Inspection of Non-Federal Dams. Warren Pond Dam (CT 00335), Thames River Basin, Stafford, Connecticut. Phase I Inspection Report.

    DTIC Science & Technology

    1980-08-01

    ant Stru-.i~ d. Reservoir Alea e. Downstream Channfel 3.2 Evaluation .................... ....... 3- SECTION 4: OPERATIONAL AND MAINTENAmCE PROCEDURES...6,500 3.43 1,895 16. Union Village 110,000 126.0 873 17. North Hartland 199,000 220.0 904 18. North Springfield 157,000 158.0 994 19. Ball Mountain ...190,000 172.0 1,105 20. Townshend 228,000 106.0(278 total) 820 21. Surry Mountain 63,000 100.0 630 22. Otter Brook 45,000 47.0 957 23. Birch Hill

  15. 78 FR 34083 - Proposed Reductions in Levels of Service at Locks and Dams on the J Bennett Johnston Waterway...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    ... DEPARTMENT OF DEFENSE Department of the Army; Corps of Engineers Proposed Reductions in Levels of... Marine Transportation System Level of Service Guidelines led to the reduced hours of operation for Lock 3... matches existing lock usage. Pool levels will not be affected by change of operating hours. DATES...

  16. 75 FR 2129 - Lock+TM

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-14

    ..., proposing to study the feasibility of Project Green Dream (Project No. 13625), to be located at the New... Dam are owned and operated by the U.S. Army Corps of Engineers. Project Green Dream would include new...

  17. 43 CFR 423.38 - Operating vessels on Reclamation waters.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... official. (i) You must not attach or anchor a vessel to structures such as locks, dams, regulatory or navigational buoys, or other structures not designed for such purpose. (j) You must display an international...

  18. 43 CFR 423.38 - Operating vessels on Reclamation waters.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... official. (i) You must not attach or anchor a vessel to structures such as locks, dams, regulatory or navigational buoys, or other structures not designed for such purpose. (j) You must display an international...

  19. Retransmission of hydrometric data in Canada. [Bow River below Carseland Dam in Calgary, Alberta

    NASA Technical Reports Server (NTRS)

    Halliday, R. A. (Principal Investigator); Reid, I. A.

    1975-01-01

    The author has identified the following significant results. The feasibility of transmitting hydrometric data to polar orbiting spacecraft and using these data for quasi-operational purposes was demonstrated.

  20. 5. DETAIL VIEW OF RADIAN GATE (LEFT, IN RAISED POSITION) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. DETAIL VIEW OF RADIAN GATE (LEFT, IN RAISED POSITION) AND HAND- OPERATED GATE HOISTS (RIGHT), LOOKING WEST - Upper Souris National Wildlife Refuge, Dam 87, Souris River Basin, Foxholm, Surrey (England), ND

Top