Sample records for orbital operations study

  1. IUS/TUG orbital operations and mission support study. Volume 2: Interim upper stage operations

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Background data and study results are presented for the interim upper stage (IUS) operations phase of the IUS/tug orbital operations study. The study was conducted to develop IUS operational concepts and an IUS baseline operations plan, and to provide cost estimates for IUS operations. The approach used was to compile and evaluate baseline concepts, definitions, and system, and to use that data as a basis for the IUS operations phase definition, analysis, and costing analysis. Both expendable and reusable IUS configurations were analyzed and two autonomy levels were specified for each configuration. Topics discussed include on-orbit operations and interfaces with the orbiter, the tracking and data relay satellites and ground station support capability analysis, and flight control center sizing to support the IUS operations.

  2. Orbital operations study. Appendix B: Operational procedures

    NASA Technical Reports Server (NTRS)

    Galvin, D. M.; Mattson, H. L.; True, D. M.; Anderson, N. R.; Mehrbach, E.; Gianformaggio, A.; Steinwachs, W. L.; Turkel, S. H.

    1972-01-01

    Operational procedures for each alternate approach for each interfacing activity of the orbital operations study are presented. The applicability of the procedures to interfacing element pairs is identified.

  3. Semiautomatic regional segmentation to measure orbital fat volumes in thyroid-associated ophthalmopathy. A validation study.

    PubMed

    Comerci, M; Elefante, A; Strianese, D; Senese, R; Bonavolontà, P; Alfano, B; Bonavolontà, B; Brunetti, A

    2013-08-01

    This study was designed to validate a novel semi-automated segmentation method to measure regional intra-orbital fat tissue volume in Graves' ophthalmopathy. Twenty-four orbits from 12 patients with Graves' ophthalmopathy, 24 orbits from 12 controls, ten orbits from five MRI study simulations and two orbits from a digital model were used. Following manual region of interest definition of the orbital volumes performed by two operators with different levels of expertise, an automated procedure calculated intra-orbital fat tissue volumes (global and regional, with automated definition of four quadrants). In patients with Graves' disease, clinical activity score and degree of exophthalmos were measured and correlated with intra-orbital fat volumes. Operator performance was evaluated and statistical analysis of the measurements was performed. Accurate intra-orbital fat volume measurements were obtained with coefficients of variation below 5%. The mean operator difference in total fat volume measurements was 0.56%. Patients had significantly higher intra-orbital fat volumes than controls (p<0.001 using Student's t test). Fat volumes and clinical score were significantly correlated (p<0.001). The semi-automated method described here can provide accurate, reproducible intra-orbital fat measurements with low inter-operator variation and good correlation with clinical data.

  4. Orbital operations study. Volume 2: Interfacing activities analysis. Part 2: Structural and mechanical group

    NASA Technical Reports Server (NTRS)

    Mattson, H. L.; Gianformaggio, A.; Anderson, N. R.

    1972-01-01

    The activities of the structural and mechanical activity group of the orbital operations study project are discussed. Element interfaces, alternate approaches, design concepts, operational procedures, functional requirements, design influences, and approach selection are presented. The following areas are considered: (1) mating, (2) orbital assembly, (3) separation, EOS payload deployment, and EOS payload retraction.

  5. Orbital transfer and release of tethered payloads. Continuation of investigation of electrodynamic stabilization and control of long orbiting tethers Martinez-Sanchez, Manuel

    NASA Technical Reports Server (NTRS)

    Colombo, G.; Grossi, M. D.; Arnold, D.

    1983-01-01

    The effect of reeling operations on the orbital altitude of the tether system and the development of control laws to minimize tether rebound upon payload release were studied. The use of the tether for LEO/GEO payload orbital transfer was also investigated. It was concluded that (1) reeling operations can contribute a significant amount of energy to the orbit of the system and should be considered in orbit calculations and predictions, (2) deployment of payloads, even very large payloads, using tethers is a practical and fully stable operation, (3) tether augmented LEO/GEO transfer operations yield useful payload gains under the practical constraint of fixed size OTV's, and (4) orbit to orbit satellite retrieval is limited by useful revisit times to orbital inclinations of less than forty-five degrees.

  6. IUS/TUG orbital operations and mission support study. Volume 3: Space tug operations

    NASA Technical Reports Server (NTRS)

    1975-01-01

    A study was conducted to develop space tug operational concepts and baseline operations plan, and to provide cost estimates for space tug operations. Background data and study results are presented along with a transition phase analysis (the transition from interim upper state to tug operations). A summary is given of the tug operational and interface requirements with emphasis on the on-orbit checkout requirements, external interface operational requirements, safety requirements, and system operational interface requirements. Other topics discussed include reference missions baselined for the tug and details for the mission functional flows and timelines derived for the tug mission, tug subsystems, tug on-orbit operations prior to the tug first burn, spacecraft deployment and retrieval by the tug, operations centers, mission planning, potential problem areas, and cost data.

  7. Satellite Power Systems (SPS) concept definition study. Volume 5: Transportation and operations analysis. [heavy lift launch and orbit transfer vehicles for orbital assembly

    NASA Technical Reports Server (NTRS)

    Hanley, G.

    1978-01-01

    The development of transportation systems to support the operations required for the orbital assembly of a 5-gigawatt satellite is discussed as well as the construction of a ground receiving antenna (rectenna). Topics covered include heavy lift launch vehicle configurations for Earth-to LEO transport; the use of chemical, nuclear, and electric orbit transfer vehicles for LEO to GEO operations; personnel transport systems; ground operations; end-to-end analysis of the construction, operation, and maintenance of the satellite and rectenna; propellant production and storage; and payload packaging.

  8. Orbital operations study. Volume 2: Interfacing activities analysis. Part 4: Support operations activity group

    NASA Technical Reports Server (NTRS)

    Steinwachs, W. L.; Patrick, J. W.; Galvin, D. M.; Turkel, S. H.

    1972-01-01

    The findings of the support operations activity group of the orbital operations study are presented. Element interfaces, alternate approaches, design concepts, operational procedures, functional requirements, design influences, and approach selection are presented. The following areas are considered: (1) crew transfer, (2) cargo transfer, (3) propellant transfer, (4) attached element operations, and (5) attached element transport.

  9. An introduction to shuttle/LDEF retrieval operations: The R-bar approach option. [orbital mechanics and braking schedule

    NASA Technical Reports Server (NTRS)

    Hall, W. M.

    1978-01-01

    Simulated orbiter direct approaches during long duration exposure facility (LDEF) retrieval operations reveal that the resultant orbiter jet plume fields can significantly disturb LDEF. An alternate approach technique which utilizes orbital mechanics forces in lieu of jets to brake the final orbiter/LDEF relative motion during the final approach, is described. Topics discussed include: rendezvous operations from the terminal phase initiation burn through braking at some standoff distance from LDEF, pilot and copilot activities, the cockpit instrumentation employed, and a convenient coordinate frame for studying the relative motion between two orbiting bodies. The basic equations of motion for operating on the LDEF radius vector are introduced. Practical considerations of implementing an R-bar approach, namely, orbiter/LDEF relative state uncertainties and orbiter control system limitations are explored. A possible R-bar approach strategy is developed and demonstrated.

  10. Orbital operation study. Volume 3: Basic vehicle summaries

    NASA Technical Reports Server (NTRS)

    Anderson, N. R.; Gianformaggio, A.

    1972-01-01

    The vehicle related data developed during the orbital operations study are described. The interfacing activity findings have been realigned into the four basic vehicle systems as follows: (1) earth orbital shuttle (EOS), (2) research and applications module (RAM), (3) space based, ground based, manned and unmanned tugs, and (4) modular space station (MSS).

  11. Orbital operations study. Appendix C: Data sources and vehicle descriptions

    NASA Technical Reports Server (NTRS)

    Steinwachs, W. L.

    1972-01-01

    A bibliography of published documents referred to throughout the orbital operations study is presented. A brief description of all of the space program elements included in the study vehicle inventory is developed.

  12. Orbit Maintenance and Navigation of Human Spacecraft at Cislunar Near Rectilinear Halo Orbits

    NASA Technical Reports Server (NTRS)

    Davis, Diane; Bhatt, Sagar; Howell, Kathleen; Jang, Jiann-Woei; Whitley, Ryan; Clark, Fred; Guzzetti, Davide; Zimovan, Emily; Barton, Gregg

    2017-01-01

    Multiple studies have concluded that Earth-Moon libration point orbits are attractive candidates for staging operations. The Near Rectilinear Halo Orbit (NRHO), a member of the Earth-Moon halo orbit family, has been singularly demonstrated to meet multi-mission architectural constraints. In this paper, the challenges associated with operating human spacecraft in the NRHO are evaluated. Navigation accuracies and human vehicle process noise effects are applied to various station keeping strategies in order to obtain a reliable orbit maintenance algorithm. Additionally, the ability to absorb missed burns, construct phasing maneuvers to avoid eclipses and conduct rendezvous and proximity operations are examined.

  13. Space Operations Center, Shuttle Interaction Study. Volume 2: Appendices, Book 1 of 2

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The feasibility of shuttle orbiter docking to the Space Operations Center (SOC) is studied. The in-orbit relative motion of the free flying orbiter and SOC was simulated, accounting for the Orbiter RCS and digital autopilot (DAP) systems, orbital mechanics, center of gravity offset of the orbiter docking port, aero and gravity gradient effects, and other pertinent natural and man-made phenomena. Since there is no specified flight path and procedure for docking, terminal closure sensitivities were investigated. Orbiter approach direction, Orbiter approach attitude out of plane, DAP thruster compensation mode, final ballistic docking distance and time to dock, rate and excursion attitude deadbands, and selection of various thruster combinations (differing from nominal) for translational pulses are considered.

  14. Space Operations Center system analysis study extension. Volume 4, book 2: SOC system analysis report

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The Space Operations Center (SOC) orbital space station research missions integration, crew requirements, SOC operations, and configurations are analyzed. Potential research and applications missions and their requirements are described. The capabilities of SOC are compared with user requirements. The SOC/space shuttle and shuttle-derived vehicle flight support operations and SOC orbital operations are described. Module configurations and systems options, SOC/external tank configurations, and configurations for geostationary orbits are described. Crew and systems safety configurations are summarized.

  15. Orbital operations study. Volume 2: Interfacing activities analyses. Part 3: Data management activity group

    NASA Technical Reports Server (NTRS)

    Mehrbach, E.; Turkel, S. H.

    1972-01-01

    A summary of the findings of the data management group of the orbital operations study is presented. Element interfaces, alternate approaches, design concepts, operational procedures, functional requirements, design influences, and approach selection are described. The following interfacing activities are considered: (1) communications, (2) rendezvous, (3) stationkeeping, and (4) detached element operations.

  16. Orbital operations study. Volume 1: Mission analysis

    NASA Technical Reports Server (NTRS)

    Steinwachs, W. L.

    1972-01-01

    The final report of the orbital operations study and a summary of the 25 elements in the study inventory are presented. Fourteen interfacing activities are defined. Eleven mission models encompassing all potential interfacing element pairs and interfacing activities are included.

  17. Orbital operation study. Volume 2: Interfacing activities analysis. Part 1: Introduction and summary

    NASA Technical Reports Server (NTRS)

    Anderson, N. R.

    1972-01-01

    The summary of the interfacing activity analyses for the orbital operations study is presented. The significant analyses are grouped into categories as follows: (1) structural and mechanical activity, (2) data management, and (3) support operations. Specific subjects concerning payload deployment, communications, rendezvous, and stationkeeping are discussed.

  18. Orbital transfer vehicle launch operations study. Processing flows. Volume 3

    NASA Technical Reports Server (NTRS)

    1986-01-01

    The Orbit Transfer Vehicle (OTV) processing flow and Resource Identification Sheets (RISs) for the ground based orbit transfer vehicle and for the space based orbit transfer vehicle are the primary source of information for the rest of the Kennedy Space Center (KSC) OTV Launch Operations Study. Work is presented which identifies KSC facility requirements for the OTV Program, simplifies or automates either flow though the application technology, revises test practices and identifies crew sizes or skills used. These flows were used as the primary point of departure from current operations and practices. Analyses results were documented by revising the appropriate RIS page.

  19. SCIAMACHY In-orbit Operations until 2013

    NASA Astrophysics Data System (ADS)

    Gottwald, Manfred; Krieg, Eckhart; Lichtenberg, Günter; Noël, Stefan; Bramstedt, Klaus; Bovensmann, Heinrich

    In 2010 ENVISAT enters its next mission extension phase when a manoeuvre transfers the plat-form from its nominal into a modified orbit. This modified orbit is not only characterized by the lower altitude but also by slightly drifting parameters such as e.g. the inclination or the Mean Local Solar Time at ascending node crossing. Thus all SCIAMACHY measurements requiring an accurate pointing knowledge are affected. How the line-of-sight evolves along the orbit de-pends on orbit altitude and orbital period. Therefore adjustments to SCIAMACHY's on-board instrument configuration are necessary reflecting this orbit chance. Based on a detailed analysis simulating SCIAMACHY operations in the modified orbit until the end of 2013, the impacts on nadir, limb and solar and lunar occultation measurements when orbiting the Earth at a reduced altitude was studied. By modifying SCIAMACHY's configuration these impacts can be compensated for. Thus the current performance of instrument operations, including the pointing knowledge, can be maintained. It ensures acquisition of high quality measurement data for the entire duration of the mission. This presentation describes how the instrument will be configured for achieving successful operations until the end of 2013. In addition a brief outlook is given how the drifting modified orbit may impact an operations phase even beyond 2013 and potential corrective countermeasures.

  20. Improved Orbiter Waste Collection System Study, Appendix D

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Basic requirements for a space shuttle orbiter waste collection system are established. They are intended to be an aid in the development and procurement of a representative flight test article. Orbiter interface requirements, performance requirements, flight crew operational requirements, flight environmental requirements, and ground operational and environmental requirements are considered.

  1. IUS/TUG orbital operations and mission support study. Volume 4: Project planning data

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Planning data are presented for the development phases of interim upper stage (IUS) and tug systems. Major project planning requirements, major event schedules, milestones, system development and operations process networks, and relevant support research and technology requirements are included. Topics discussed include: IUS flight software; tug flight software; IUS/tug ground control center facilities, personnel, data systems, software, and equipment; IUS mission events; tug mission events; tug/spacecraft rendezvous and docking; tug/orbiter operations interface, and IUS/orbiter operations interface.

  2. Safety in earth orbit study. Volume 5: Space shuttle payloads: Safety requirements and guidelines on-orbit phase

    NASA Technical Reports Server (NTRS)

    1972-01-01

    Safety requirements and guidelines are listed for the sortie module, upper stage vehicle, and space station for the earth orbit operations of the space shuttle program. The requirements and guidelines are for vehicle design, safety devices, warning devices, operational procedures, and residual hazards.

  3. Moonport: Transportation node in lunar orbit

    NASA Technical Reports Server (NTRS)

    1987-01-01

    An orbital transporation system between the Earth and Moon was designed. The design work focused on the requirements and configuration of an orbiting lunar base. The design utilized current Space Station technologies, but also focused on the specific requirements involved with a permanently manned, orbiting lunar station. A model of the recommended configuration was constructed. In order to analyze Moonport activity and requirements, a traffic model was designed, defining traffic between the lunar port, or Moonport and low Earth orbit. Also, a lunar base model was used to estimate requirements of the surface base on Moonport traffic and operations. A study was conducted to compare Moonport traffic and operations based in low lunar orbit and the L (sub 2) equilibrium point, behind the Moon. The study compared delta-V requirements to each location and possible payload deliveries to low Earth orbit from each location. Products of the Moonport location study included number of flights annually to Moonport, net payload delivery to low Earth orbit, and Moonport storage requirement.

  4. Manned orbital systems concepts study. Book 2: Requirements for extended-duration missions

    NASA Technical Reports Server (NTRS)

    1975-01-01

    In order to provide essential data needed in long-range program planning, the Manned Orbital Systems Concepts (MOSC) study attempted to define, evaluate, and compare concepts for manned orbital systems that provide extended experiment mission capabilities in space, flexibility of operation, and growth potential. Specific areas discussed include roles and requirements for man in future space missions, requirements for extended capability, mission/payload concepts, and preliminary design and operational requirements.

  5. Illumination from space with orbiting solar-reflector spacecraft

    NASA Technical Reports Server (NTRS)

    Canady, J. E., Jr.; Allen, J. L., Jr.

    1982-01-01

    The feasibility of using orbiting mirrors to reflect sunlight to Earth for several illumination applications is studied. A constellation of sixteen 1 km solar reflector spacecraft in geosynchronous orbit can illuminate a region 333 km in diameter to 8 lux, which is brighter than most existing expressway lighting systems. This constellation can serve one region all night long or can provide illumination during mornings and evenings to five regions across the United States. Preliminary cost estimates indicate such an endeavor is economically feasible. The studies also explain how two solar reflectors can illuminate the in-orbit nighttime operations of Space Shuttle. An unfurlable, 1 km diameter solar reflector spacecraft design concept was derived. This spacecraft can be packaged in the Space, Shuttle, transported to low Earth orbit, unfurled, and solar sailed to operational orbits up to geosynchronous. The necessary technical studies and improvements in technology are described, and potential environmental concerns are discussed.

  6. Payload/orbiter contamination control assessment support

    NASA Technical Reports Server (NTRS)

    Rantanen, R. O.; Ress, E. B.

    1975-01-01

    The development and use is described of a basic contamination mathematical model of the shuttle orbiter which incorporates specific shuttle orbiter configurations and contamination sources. These configurations and sources were evaluated with respect to known shuttle orbiter operational surface characteristics and specific lines-of-sight which encompass the majority of viewing requirements for shuttle payloads. The results of these evaluations are presented as summary tables for each major source. In addition, contamination minimization studies were conducted and recommendations are made, where applicable, to support the shuttle orbiter design and operational planning for those sources which were identified to present a significant contamination threat.

  7. Analyses of space environment effects on active fiber optic links orbited aboard the LDEF

    NASA Technical Reports Server (NTRS)

    Taylor, Edward W.; Monarski, T. W.; Berry, J. N.; Sanchez, A. D.; Padden, R. J.; Chapman, S. P.

    1993-01-01

    The results of the 'Preliminary Analysis of WL Experiment no. 701, Space Environment Effects on Operating Fiber Optic Systems,' is correlated with space simulated post retrieval terrestrial studies performed on the M0004 experiment. Temperature cycling measurements were performed on the active optical data links for the purpose of assessing link signal to noise ratio and bit error rate performance some 69 months following the experiment deployment in low Earth orbit. The early results indicate a high correlation between pre-orbit, orbit, and post-orbit functionality of the first known and longest space demonstration of operating fiber optic systems.

  8. Space Station Freedom assembly and operation at a 51.6 degree inclination orbit

    NASA Technical Reports Server (NTRS)

    Troutman, Patrick A.; Brewer, Laura M.; Heck, Michael L.; Kumar, Renjith R.

    1993-01-01

    This study examines the implications of assembling and operating Space Station Freedom at a 51.6 degree inclination orbit utilizing an enhanced lift Space Shuttle. Freedom assembly is currently baselined at a 220 nautical mile high, 28.5 degree inclination orbit. Some of the reasons for increasing the orbital inclination are (1) increased ground coverage for Earth observations, (2) greater accessibility from Russian and other international launch sites, and (3) increased number of Assured Crew Return Vehicle (ACRV) landing sites. Previous studies have looked at assembling Freedom at a higher inclination using both medium and heavy lift expendable launch vehicles (such as Shuttle-C and Energia). The study assumes that the shuttle is used exclusively for delivering the station to orbit and that it can gain additional payload capability from design changes such as a lighter external tank that somewhat offsets the performance decrease that occurs when the shuttle is launched to a 51.6 degree inclination orbit.

  9. A feasibility study of unmanned rendezvous and docking in Mars orbit: Midterm review

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The ascent, rendezvous, docking and sample transfer operations in a potential MSSR mission that uses the Mars orbital rendezvous mode are considered. In order that the design choices made for these operations remain compatible with the rest of the mission, the impact on the Earth launch, Mars landing and orbiting and Earth return phase are also being assessed. The selection and description of a preliminary baseline concept are presented.

  10. A Southern Hemisphere radar meteor orbit survey

    NASA Technical Reports Server (NTRS)

    Baggaley, W. Jack; Steel, Duncan I.; Taylor, Andrew D.

    1992-01-01

    A meteor radar system has been operated on a routine basis near Christchurch, New Zealand, to determine the orbits of Earth-impacting interplanetary dust and meteoroids. The system sensitivity is +13 visual magnitude, corresponding to approximately 100 micron sized meteoroids. With an orbital precision of 2 degrees in angular elements and 10 percent in orbital energy (1/a), the operation yields an average of 1500 orbits daily with a total to date in excess of 10(exp 5). The use of pc's and automated data reduction permit the large orbital data sets we collect to be routinely reduced. Some illustrative examples are presented of the signal formats/processing and the results of data reduction, giving the individual orbital elements and hence the overall distributions. Current studies include the distribution of dust in the inner solar system; the influx of meteoroids associated with near-Earth asteroids; and the orbital structure existing in comet-produced streams.

  11. Concept considerations for a small orbital transfer vehicle

    NASA Technical Reports Server (NTRS)

    Green, M.; Sibila, A. I.

    1979-01-01

    This paper summarizes a study of small orbital transfer vehicles to place payloads in orbits with altitudes above those of the standard Shuttle operations. The overall objective of the study is to examine the role of the small orbital transfer vehicle (SOTV) in Shuttle operations and to identify typical propulsion concepts for accomplishing the mission. Consideration is given to existing and planned systems and upper stages, along with new propulsion stages. The new propulsion concept development examines tandem and clustered solids, controlled solids, monopropellant and bipropellant liquids, and staged solid/liquid combinations. The paper presents considerations of the mission requirements, tradeoffs of the various configurations, and candidate selections. For the selected candidate concepts the performance, support equipment, operational considerations and program costs were determined. The results show that a new modular liquid stage system is cost effective in handling the majority of the payloads considered. The remainder of the payloads can be accomodated by existing systems.

  12. Proceedings of the 20th International Symposium on Space Flight Dynamics

    NASA Technical Reports Server (NTRS)

    Woodard, Mark (Editor); Stengle, Tom (Editor)

    2007-01-01

    Topics include: Measuring Image Navigation and Registration Performance at the 3-Sigma Level Using Platinum Quality Landmarks; Flight Dynamics Performances of the MetOp A Satellite during the First Months of Operations; Visual Navigation - SARE Mission; Determining a Method of Enabling and Disabling the Integral Torque in the SDO Science and Inertial Mode Controllers; Guaranteeing Pointing Performance of the SDO Sun-Pointing Controllers in Light of Nonlinear Effects; SDO Delta H Mode Design and Analysis; Observing Mode Attitude Controller for the Lunar Reconnaissance Orbiter; Broken-Plane Maneuver Applications for Earth to Mars Trajectories; ExoMars Mission Analysis and Design - Launch, Cruise and Arrival Analyses; Mars Reconnaissance Orbiter Aerobraking Daily Operations and Collision Avoidance; Mars Reconnaissance Orbiter Interplanetary Cruise Navigation; Motion Parameters Determination of the SC and Phobos in the Project Phobos-Grunt; GRAS NRT Precise Orbit Determination: Operational Experience; Orbit Determination of LEO Satellites for a Single Pass through a Radar: Comparison of Methods; Orbit Determination System for Low Earth Orbit Satellites; Precise Orbit Determination for ALOS; Anti-Collision Function Design and Performances of the CNES Formation Flying Experiment on the PRISMA Mission; CNES Approaching Guidance Experiment within FFIORD; Maneuver Recovery Analysis for the Magnetospheric Multiscale Mission; SIMBOL-X: A Formation Flying Mission on HEO for Exploring the Universe; Spaceborne Autonomous and Ground Based Relative Orbit Control for the TerraSAR-X/TanDEM-X Formation; First In-Orbit Experience of TerraSAR-X Flight Dynamics Operations; Automated Target Planning for FUSE Using the SOVA Algorithm; Space Technology 5 Post-Launch Ground Attitude Estimation Experience; Standardizing Navigation Data: A Status Update; and A Study into the Method of Precise Orbit Determination of a HEO Orbiter by GPS and Accelerometer.

  13. Mars Reconnaissance Orbiter Aerobraking Daily Operations and Collision Avoidance

    NASA Technical Reports Server (NTRS)

    Long, Stacia M.; You, Tung-Han; Halsell, C. Allen; Bhat, Ramachand S.; Demcak, Stuart W.; Graat, Eric J.; Higa, Earl S.; Highsmith, Dolan E.; Mottinger, Neil A.; Jah, Moriba K.

    2007-01-01

    The Mars Reconnaissance Orbiter reached Mars on March 10, 2006 and performed a Mars orbit insertion maneuver of 1 km/s to enter into a large elliptical orbit. Three weeks later, aerobraking operations began and lasted about five months. Aerobraking utilized the atmospheric drag to reduce the large elliptical orbit into a smaller, near circular orbit. At the time of MRO aerobraking, there were three other operational spacecraft orbiting Mars and the navigation team had to minimize the possibility of a collision. This paper describes the daily operations of the MRO navigation team during this time as well as the collision avoidance strategy development and implementation.

  14. Safety in earth orbit study. Volume 2: Analysis of hazardous payloads, docking, on-board survivability

    NASA Technical Reports Server (NTRS)

    1972-01-01

    Detailed and supporting analyses are presented of the hazardous payloads, docking, and on-board survivability aspects connected with earth orbital operations of the space shuttle program. The hazards resulting from delivery, deployment, and retrieval of hazardous payloads, and from handling and transport of cargo between orbiter, sortie modules, and space station are identified and analyzed. The safety aspects of shuttle orbiter to modular space station docking includes docking for assembly of space station, normal resupply docking, and emergency docking. Personnel traffic patterns, escape routes, and on-board survivability are analyzed for orbiter with crew and passenger, sortie modules, and modular space station, under normal, emergency, and EVA and IVA operations.

  15. Study of orbiter/payload interface communications configuration control board directive from an operational perspective

    NASA Technical Reports Server (NTRS)

    Addis, A. W.; Tatosian, C. G.; Lidsey, J. F.

    1974-01-01

    Orbiter/payload data and communications interface was examined. It was found that the Configuration Control Board Directive (CCBD) greatly increases the capability of the orbiter to communicate with a wide variety of projected shuttle payloads. Rather than being derived from individual payload communication requirements, the CCBD appears to be based on an operational philosophy that requires the orbiter to duplicate or augment the ground network/payload communication links. It is suggested that the implementation of the CCBD be reviewed and compared with the Level 1 Program Requirements Document, differences reconciled, and interface characteristics defined.

  16. The development of an advanced generic solar dynamic heat receiver thermal model

    NASA Technical Reports Server (NTRS)

    Wu, Y. C.; Roschke, E. J.; Kohout, L.

    1988-01-01

    An advanced generic solar dynamic heat receiver thermal model under development which can analyze both orbital transient and orbital average conditions is discussed. This model can be used to study advanced receiver concepts, evaluate receiver concepts under development, analyze receiver thermal characteristics under various operational conditions, and evaluate solar dynamic system thermal performances in various orbit conditions. The model and the basic considerations that led to its creation are described, and results based on a set of baseline orbit, configuration, and operational conditions are presented to demonstrate the working of the receiver model.

  17. Safety in earth orbit study. Volume 1: Technical summary

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A summary of the technical results and conclusions is presented of the hazards analyses of earth orbital operations in conjunction with the space shuttle program. The space shuttle orbiter and a variety of manned and unmanned payloads delivered to orbit by the shuttle are considered. The specific safety areas examined are hazardous payloads, docking, on-orbit survivability, tumbling spacecraft, and escape and rescue.

  18. Flight Performance Handbook for Orbital Operations: Orbital Mechanics and Astrodynamics Formulae, Theorems, Techniques, and Applications

    NASA Technical Reports Server (NTRS)

    Ambrosio, Alphonso; Blitzer, Leon; Conte, S.D.; Cooper, Donald H.; Dergarabedian, P.; Dethlefsen, D.G.; Lunn, Richard L.; Ireland, Richard O.; Jensen, Arnold A.; Kang, Garfield; hide

    1961-01-01

    This handbook provides parametric data useful both to the space vehicle designer and mission analyst. It provides numerical and analytical relationships between missions and gross vehicle characteristics as a function of performance parameters. The effects of missile constraints and gross guidance limitations plus operational constraints such as launch site location, tracking net location, orbit visibility and mission on trajectory and orbit design parameters are exhibited. The influence of state-of- the-art applications of solar power as compared to future applications of nuclear power on orbit design parameters, such as eclipse time, are among the parameters included in the study. The principal aim, however, is in providing the analyst with useful parametric design information to cover the general area of earth satellite missions in the region of near-earth to cislunar space and beyond and from injection to atmospheric entry and controlled descent. The chapters are organized around the central idea of orbital operations in the 1961-1969 era with emphasis on parametric flight mechanics studies for ascent phase and parking orbits, transfer maneuvers, rendezvous maneuver, operational orbit considerations, and operational orbit control. The results are based almost entirely on the principles of flight and celestial mechanics. Numerous practical examples have been worked out in detail. This is especially important where it has been difficult or impossible to represent all possible variations of the parameters. The handbook contains analytical formulae and sufficient textual material to permit their proper use. The analytic methods consist of both exact and rapid, approximate methods. Scores of tables, working graphs and illustrations amplify the mathematical models which, together with important facts and data, cover the engineering and scientific applications of orbital mechanics. Each of the five major chapters are arranged to provide a rapid review of an entire astrodynamic subject. By the use of compact graphical and tabular presentation the full scope of the material is made available in an easy-to-use style. Throughout the volume the analyst is shown, by means of suitable introductions, notes, authoritative examples, and cross-references the vital interrelation of the various orbital mechanics topics in the general field of earth satellites and satellite rendezvous. The handbook is designed to give the analyst rapid, reliable access to the mathematics of orbital mechanics needed for virtually any working requirements.

  19. Space-based solar power conversion and delivery systems (study), engineering analysis

    NASA Technical Reports Server (NTRS)

    Nathan, C. A.

    1975-01-01

    A systems analysis of synchronous, orbit-based power generation and relay systems that could be operational in the 1990's is described along with a comparison with earth-based systems to be operational in the same time frame. Operational and economic requirements for the orbiting systems and near term research activities which will be required to assure feasibility, development, launch and operational capabilities of such systems in the post- 1990 time frame are examined.

  20. Test and training simulator for ground-based teleoperated in-orbit servicing

    NASA Technical Reports Server (NTRS)

    Schaefer, Bernd E.

    1989-01-01

    For the Post-IOC(In-Orbit Construction)-Phase of COLUMBUS it is intended to use robotic devices for the routine operations of ground-based teleoperated In-Orbit Servicing. A hardware simulator for verification of the relevant in-orbit operations technologies, the Servicing Test Facility, is necessary which mainly will support the Flight Control Center for the Manned Space-Laboratories for operational specific tasks like system simulation, training of teleoperators, parallel operation simultaneously to actual in-orbit activities and for the verification of the ground operations segment for telerobotics. The present status of definition for the facility functional and operational concept is described.

  1. Measurements of the STS orbiter's angular stability during in-orbit operations

    NASA Technical Reports Server (NTRS)

    Neupert, Werner M.; Epstein, Gabriel L.; Houston, James; Zarechnak, Andrew

    1995-01-01

    We report on measurements of the angular stability, commonly called 'jitter', of the STS Orbiter during normal operations in space. Measurements were carried out by measuring optically the Orbiter's roll and pitch orientation relative to the solar vector as the orbiter was held in a -Z(sub 0) solar inertial orientation (orbiter bay oriented toward the Sun). We also report observations of an interesting perturbation to the orbiter's orientation noted by the crew during the STS-60 mission. These data may be useful in analyzing the in-orbit response of the Orbiter to thruster firings and other applied torques, and may aid in the planning of future experiments that require fine-pointed operations by the orbiter.

  2. Orbital Spacecraft Consumables Resupply System (OSCRS). Volume 4: Extended study results Part 1: Executive Summary

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The objectives consisted of three major tasks. The first was to establish the definition of Space Station and Orbital Maneuvering Vehicle (OMV) user requirements and interfaces and to evaluate system requirements of a water tanker to be used at the station. The second task is to conduct trade studies of system requirements, hardware/software, and operations to evaluate the effect of automatic operation at the station or remote from the station in consonance with the OMV. The last task is to evaluate automatic refueling concepts and to evaluate the impact to Orbital Spacecraft Consumable Resupply System (OSCRS) concept/design to use expendable launch vehicles (ELV) to place the tank into orbit. Progress in each area is discussed.

  3. Planning Bepicolombo MPO Science Operations to study Mercury Interior

    NASA Astrophysics Data System (ADS)

    De La Fuente, Sara; Carasa, Angela; Ortiz, Iñaki; Rodriguez, Pedro; Casale, Mauro; Benkhoff, Johannes; Zender, Joe

    2017-04-01

    BepiColombo is an Interdisciplinary Cornerstone ESA-JAXA Mission to Mercury, with two orbiters, the ESA Mercury Planetary Orbiter (MPO) and the JAXA Mercury Magnetospheric Orbiter (MMO) dedicated to study of the planet and its magnetosphere. The MPO, is a three-axis-stabilized, nadir-pointing spacecraft which will be placed in a polar orbit, providing excellent spatial resolution over the entire planet surface. The MPO's scientific payload comprises 11 instrument packages, including laser altimeter, cameras and the radio science experiment that will be dedicated to the study of Mercury's interior: structure, composition, formation and evolution. The planning of the science operations to be carried out by the Mercury's interior scientific instruments will be done by the SGS located at the European Space Astronomy Centre (ESAC), in conjunction with the scientific instrument teams. The process will always consider the complete nominal mission duration, such that the contribution of the scheduled science operations to the science objectives, the total data volume generated, and the seasonal interdependency, can be tracked. The heart of the science operations planning process is the Observations Catalogue (OC), a web-accessed database to collect and analyse all science operations requests. From the OC, the SGS will first determine all science opportunity windows compatible with the spacecraft operational constraints. Secondly, only those compatible with the resources (power and data volume) and pointing constraints will be chosen, including slew feasibility.

  4. Experiment module concepts study. Volume 5 book 1, appendix A: Shuttle only task

    NASA Technical Reports Server (NTRS)

    1970-01-01

    Results of a preliminary investigation of the effect on the candidate experiment program implementation of experiment module operations in the absence of an orbiting space station and with the availability of the space shuttle orbiter vehicle only are presented. The fundamental hardware elements for shuttle-only operation of the program are: (1) integrated common experiment modules CM-1, CM-3, and CM-4, together with the propulsion slice; (2) support modules capable of supplying on-orbit crew life support, power, data management, and other services normally provided by a space station; (3) dormancy kits to enable normally attached modules to remain in orbit while shuttle returns to earth; and (4) shuttle orbiter. Preliminary cost estimates for 30 day on-orbit and 5 day on-orbit capabilities for a four year implementation period are $4.2 billion and $2.1 billion, respectively.

  5. Extended duration Orbiter life support definition

    NASA Technical Reports Server (NTRS)

    Kleiner, G. N.; Thompson, C. D.

    1978-01-01

    Extending the baseline seven-day Orbiter mission to 30 days or longer and operating with a solar power module as the primary source for electrical power requires changes to the existing environmental control and life support (ECLS) system. The existing ECLS system imposes penalties on longer missions which limit the Orbiter capabilities and changes are required to enhance overall mission objectives. Some of these penalties are: large quantities of expendables, the need to dump or store large quantities of waste material, the need to schedule fuel cell operation, and a high landing weight penalty. This paper presents the study ground rules and examines the limitations of the present ECLS system against Extended Duration Orbiter mission requirements. Alternate methods of accomplishing ECLS functions for the Extended Duration Orbiter are discussed. The overall impact of integrating these options into the Orbiter are evaluated and significant Orbiter weight and volume savings with the recommended approaches are described.

  6. IUS/TUG orbital operations and mission support study. Volume 5: Cost estimates

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The costing approach, methodology, and rationale utilized for generating cost data for composite IUS and space tug orbital operations are discussed. Summary cost estimates are given along with cost data initially derived for the IUS program and space tug program individually, and cost estimates for each work breakdown structure element.

  7. RCS jet-flow field interaction effects on the aerodynamics of the space shuttle orbiter

    NASA Technical Reports Server (NTRS)

    Rausch, J. R.; Roberge, A. M.

    1973-01-01

    A study was conducted to determine the external effects caused by operation of the reaction control system during entry of the space shuttle orbiter. The effects of jet plume-external flow interactions were emphasized. Force data were obtained for the basic airframe characteristics plus induced effects when the reaction control system is operating. Resulting control amplification and/or coupling were derived and their effects on the aerodynamic stability and control of the orbiter and the reaction control system thrust were determined.

  8. Integrated orbital servicing study follow-on. Volume 2: Technical analysis and system design

    NASA Technical Reports Server (NTRS)

    1978-01-01

    In-orbit service functional and physical requirements to support both low and high Earth orbit servicing/maintenance operations were defined, an optimum servicing system configuration was developed and mockups and early prototype hardware were fabricated to demonstrate and validate the concepts selected. Significant issues addressed include criteria for concept selection; representative mission equipment and approaches to their design for serviceability; significant serviceable spacecraft design aspects; servicer mechanism operation in one-g; approaches for the demonstration/simulation; and service mechanism structure design approach.

  9. Orbital operations study. Appendix A: Interactivity analysis

    NASA Technical Reports Server (NTRS)

    1972-01-01

    Supplemental analyses conducted to verify that safe, feasible, design concepts exist for accomplishing the attendant interface activities of the orbital operations mission are presented. The data are primarily concerned with functions and concepts common to more than one of the interfacing activities or elements. Specific consideration is given to state vector update, payload deployment, communications links, jet plume impingement, attached element operations, docking and structural interface assessment, and propellant transfer.

  10. Space Operations Center, shuttle interaction study, volume 1

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The feasibility of the shuttle remote manipulator system (SRMS)-aided space operations center (SOC)/orbiter berthing was evaluated to determine: (1) whether the initial rates between the SOC and the orbiter can be removed by the arm; (2) what is the best strategy to be used; (3) whether the post-capture and maneuvering loads are within the capability of the SRMS; (4) can the SOC berthing port be brought in the immediate proximity of the orbiter berthing port; and (5) what is the best way to remove the residual relative motions. Various notational conventions are established and various important locations on the orbiter and SOC structures are defined. Reference frames are defined together with the mass properties of both the SOC and the orbiter.

  11. Study to identify future cryogen payload elements/users for space shuttle launch during period 1990 to 2000

    NASA Technical Reports Server (NTRS)

    Elim, Frank M.

    1989-01-01

    This study provides a summary of future cryogenic space payload users, their currently projected needs and reported planning for space operations over the next decade. At present, few users with payloads consisting of reactive cryogens, or any cryogen in significant quantities, are contemplating the use of the Space Shuttle. Some members of the cryogenic payload community indicated an interest in flying their future planned payloads on the orbiter, versus an expendable launch vehicle (ELV), but are awaiting the outcome of a Rockwell study to define what orbiter mods and payloads requirements are needed to safely fly chemically reactive cryogen payloads, and the resultant cost, schedule, and operational impacts. Should NASA management decide in early 1990 to so modify orbiter(s), based on the Rockwell study and/or changes in national defense payloads launch requirements, then at least some cryo payload customers will reportedly plan on using the Shuttle orbiter vehicle in preference to an ELV. This study concludes that the most potential for possible future cryogenic space payloads for the Space Transportation System Orbiter fleet lies within the scientific research and defense communities.

  12. The orbiter mate/demate device

    NASA Technical Reports Server (NTRS)

    Miller, A. J.; Binkley, W. H.

    1985-01-01

    The numerous components and systems of the space shuttle orbiter mate/demate device (MDD) are discussed. Special emphasis is given, mechanisms and mechanical systems to discuss in general their requirements, functions, and design; and, where applicable, to relate any unusual problems encountered during the initial concept studies, final design, and construction are discussed. The MDD and its electrical, machinery, and mechanical systems, including the main hoisting system, power operated access service platform, wind restrain and adjustment mechanism, etc., were successfully designed and constructed. The MDD was used routinely during the initial orbiter-747 approach and landing test and the more recent orbiter flight tests recovery and mate operations.

  13. On-orbit checkout of satellites, volume 2. Part 3 of on-orbit checkout study. [space maintenance

    NASA Technical Reports Server (NTRS)

    Pritchard, E. I.

    1978-01-01

    Early satellite failures significantly degrading satellite operations are reviewed with emphasis on LANDSAT D, the Technology Demonstration Satellite, the ATREX/AEM spacecraft, STORMSAT 2, and the synchronous meteorological satellite. Candidates for correction with on-orbit checkout and appropriate actions are analyzed. On-orbit checkout subsystem level studies are summarized for electrical power, attitude control, thermal control, reaction control and propulsion, instruments, and angular rate matching for alignment of satellite IRU.

  14. Space shuttle. [a transportation system for low orbit space missions

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The space shuttle is discussed as a reusable space vehicle operated as a transportation system for space missions in low earth orbit. Space shuttle studies and operational capabilities are reported for potential missions indicating that about 38 percent are likely to be spacelab missions with the remainder being the replacement, revisit, or retrieval of automated spacecraft.

  15. Virtual Ultrasound Guidance for Inexperienced Operators

    NASA Technical Reports Server (NTRS)

    Caine, Timothy; Martin, Davis

    2012-01-01

    Medical ultrasound or echocardiographic studies are highly operator-dependent and generally require lengthy training and internship to perfect. To obtain quality echocardiographic images in remote environments, such as on-orbit, remote guidance of studies has been employed. This technique involves minimal training for the user, coupled with remote guidance from an expert. When real-time communication or expert guidance is not available, a more autonomous system of guiding an inexperienced operator through an ultrasound study is needed. One example would be missions beyond low Earth orbit, in which the time delay inherent with communication will make remote guidance impractical.

  16. Orbital and Landing Operations at Near-Earth

    NASA Technical Reports Server (NTRS)

    Scheeres, D. J.

    1995-01-01

    Orbital and landing operations about near-Earth asteroids are different than classical orbital operations about large bodies. The major differences lie with the small mass of the asteroid, the lower orbital velocities, the larger Solar tide and radiation pressure perturbations, the irregular shape of the asteroid and the potential for non-uniform rotation of the asteroid. These differences change the nature of orbits about an asteroid to where it is often common to find trajectories that evolve from stable, near-circular orbits to crashing or escaping orbits in a matter of days. The understanding and control of such orbits is important if a human or robotic presence at asteroids is to be commonplace in the future.

  17. Evaluation of advanced geopotential models for operational orbit determination

    NASA Technical Reports Server (NTRS)

    Radomski, M. S.; Davis, B. E.; Samii, M. V.; Engel, C. J.; Doll, C. E.

    1988-01-01

    To meet future orbit determination accuracy requirements for different NASA projects, analyses are performed using Tracking and Data Relay Satellite System (TDRSS) tracking measurements and orbit determination improvements in areas such as the modeling of the Earth's gravitational field. Current operational requirements are satisfied using the Goddard Earth Model-9 (GEM-9) geopotential model with the harmonic expansion truncated at order and degree 21 (21-by-21). This study evaluates the performance of 36-by-36 geopotential models, such as the GEM-10B and Preliminary Goddard Solution-3117 (PGS-3117) models. The Earth Radiation Budget Satellite (ERBS) and LANDSAT-5 are the spacecraft considered in this study.

  18. Early Mission Maneuver Operations for the Deep Space Climate Observatory Sun-Earth L1 Libration Point Mission

    NASA Technical Reports Server (NTRS)

    Roberts, Craig; Case, Sara; Reagoso, John; Webster, Cassandra

    2015-01-01

    The Deep Space Climate Observatory mission launched on February 11, 2015, and inserted onto a transfer trajectory toward a Lissajous orbit around the Sun-Earth L1 libration point. This paper presents an overview of the baseline transfer orbit and early mission maneuver operations leading up to the start of nominal science orbit operations. In particular, the analysis and performance of the spacecraft insertion, mid-course correction maneuvers, and the deep-space Lissajous orbit insertion maneuvers are discussed, com-paring the baseline orbit with actual mission results and highlighting mission and operations constraints..

  19. Payload/orbiter contamination control requirement study

    NASA Technical Reports Server (NTRS)

    Bareiss, L. E.; Rantanen, R. O.; Ress, E. B.

    1974-01-01

    A study was conducted to determine and quantify the expected particulate and molecular on-orbit contaminant environment for selected space shuttle payloads as a result of major shuttle orbiter contamination sources. Individual payload susceptibilities to contamination are reviewed. The risk of payload degradation is identified and preliminary recommendations are provided concerning the limiting factors which may depend on operational activities associated with the payload/orbiter interface or upon independent payload functional activities. A basic computer model of the space shuttle orbiter which includes a representative payload configuration is developed. The major orbiter contamination sources, locations, and flux characteristics based upon available data have been defined and modeled.

  20. Satellite Power Systems (SPS) concept definition study. Volume 5: Special emphasis studies. [rectenna and solar power satellite design studies

    NASA Technical Reports Server (NTRS)

    Hanley, G. M.

    1980-01-01

    Satellite configurations based on the Satellite Power System baseline requirements were analyzed and a preferred concept selected. A satellite construction base was defined, precursor operations incident to establishment of orbital support facilities identified, and the satellite construction sequence and procedures developed. Rectenna construction requirement were also addressed. Mass flow to orbit requirements were revised and traffic models established based on construction of 60 instead of 120 satellites. Analyses were conducted to determine satellite control, resources, manufacturing, and propellant requirements. The impact of the laser beam used for space-to-Earth power transmission upon the intervening atmosphere was examined as well as the inverse effect. The significant space environments and their effects on spacecraft components were investigated to define the design and operational limits imposed by the environments on an orbit transfer vehicle. The results show that LEO altitude 300 nmi and transfer orbit duration 6 months are preferrable.

  1. Applications of 3D orbital computer-assisted surgery (CAS).

    PubMed

    Scolozzi, P

    2017-09-01

    The purpose of the present report is to describe the indications for use of 3D orbital computer-assisted surgery (CAS). We analyzed the clinical and radiological data of all patients with orbital deformities treated using intra-operative navigation and CAD/CAM techniques at the Hôpitaux Universitaires de Genève, Switzerland, between 2009 and 2016. We recorded age and gender, orbital deformity, technical and surgical procedure and postoperative complications. One hundred and three patients were included. Mean age was 39.5years (range, 5 to 84years) and 85 (87.5%) were men. Of the 103 patients, 96 had intra-operative navigation (34 for primary and 3 for secondary orbito-zygomatic fractures, 15 for Le Fort fractures, 16 for orbital floor fractures, 10 for combined orbital floor and medial wall fractures, 7 for orbital medial wall fractures, 3 for NOE (naso-orbito-ethmoidal) fractures, 2 for isolated comminuted zygomatic arch fractures, 1 for enophthalmos, 3 for TMJ ankylosis and 2 for fibrous dysplasia bone recontouring), 8 patients had CAD/CAM PEEK-PSI for correction of residual orbital bone contour following craniomaxillofacial trauma, and 1 patient had CAD/CAM surgical splints and cutting guides for correction of orbital hypertelorism. Two patient (1.9%) required revision surgery for readjustment of an orbital mesh. The 1-year follow-up examination showed stable cosmetic and dimensional results in all patients. This study demonstrated that the application of 3D orbital CAS with regards to intra-operative navigation and CAD/CAM techniques allowed for a successful outcome in the patients presented in this series. Copyright © 2017 Elsevier Masson SAS. All rights reserved.

  2. Space Operations Center system analysis study extension. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The analysis fo Space Operations Center (SOC) systems is summarized. Design considerations, configurations of the manned orbital space station, planned operational and research missions, and subsystem tradeoffs are considered. Integration into the space transportation system is discussed. A modular design concept permitting growth of the SOC as its functions are expanded is described. Additional considerations are special requirements for habitat modules, design modifications needed to operate in geosynchronous orbits, and use of the external tank for cryogenic propellant storage or as a pressurized hangar. A cost summary is presented.

  3. Low Earth orbit communications satellite

    NASA Technical Reports Server (NTRS)

    Moroney, D.; Lashbrook, D.; Mckibben, B.; Gardener, N.; Rivers, T.; Nottingham, G.; Golden, B.; Barfield, B.; Bruening, J.; Wood, D.

    1992-01-01

    A current thrust in satellite communication systems considers a low-Earth orbiting constellations of satellites for continuous global coverage. Conceptual design studies have been done at the time of this design project by LORAL Aerospace Corporation under the program name GLOBALSTAR and by Motorola under their IRIDIUM program. This design project concentrates on the spacecraft design of the GLOBALSTAR low-Earth orbiting communication system. Overview information on the program was gained through the Federal Communications Commission licensing request. The GLOBALSTAR system consists of 48 operational satellites positioned in a Walker Delta pattern providing global coverage and redundancy. The operational orbit is 1389 km (750 nmi) altitude with eight planes of six satellites each. The orbital planes are spaced 45 deg., and the spacecraft are separated by 60 deg. within the plane. A Delta 2 launch vehicle is used to carry six spacecraft for orbit establishment. Once in orbit, the spacecraft will utilize code-division multiple access (spread spectrum modulation) for digital relay, voice, and radio determination satellite services (RDSS) yielding position determination with accuracy up to 200 meters.

  4. Solar power satellite system definition study. Part 2, volume 5: Space operations (construction and transportation)

    NASA Technical Reports Server (NTRS)

    Miller, K.; Davis, E. E.

    1977-01-01

    Construction and transportation systems and operations are described for the following combinations: (1) silicon photovoltaic CR=1 satellite constructed primarily in low earth orbit (LEO); (2) silicon photovoltaic CR=1 satellite constructed in geosynchronous earth orbit (GEO); (3) Rankine thermal engine satellite constructed primarily in LEO; and (4) Rankine thermal engine satellite constructed in GEO.

  5. Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 5: PEP environmental specification

    NASA Technical Reports Server (NTRS)

    1979-01-01

    This specification establishes the natural and induced environments to which the power extension package may be exposed during ground operations and space operations with the shuttle system. Space induced environments are applicable at the Orbiter attach point interface location. All probable environments are systematically listed according to each ground and mission phase.

  6. Cislunar Near Rectilinear Halo Orbit for Human Space Exploration

    NASA Technical Reports Server (NTRS)

    Whitley, Ryan; Martinez, Roland; Condon, Gerald; Williams, Jacob; Lee, David; Davis, Diane; Barton, Gregg; Bhatt, Sagar; Jang, Jiann-Woei; Clark, Fred; hide

    2016-01-01

    In order to conduct sustained human exploration beyond Low Earth Orbit (LEO), spacecraft systems are designed to operate in a series of missions of increasing complexity. Regardless of the destination, Moon, Mars, asteroids or beyond, there is a substantial set of common objectives that must be met. Many orbit characterization studies have endeavored to evaluate the potential locations in cislunar space that are favorable for meeting common human exploration objectives in a stepwise approach. Multiple studies, by both NASA and other international space agencies, have indicated that Earth-­-moon libration point orbits are attractive candidates for staging operations in the proving ground and beyond. In particular, the Near Rectilinear Orbit (NRO) has been demonstrated to meet multi-­-mission and multi-­-destination architectural constraints. However, a human mission to a selected NRO presents a variety of new challenges for mission planning. While a growing number of robotic missions have completed successful operations to various specific libration point orbits, human missions have never been conducted to orbits of this class. Human missions have unique challenges that differ significantly from robotic missions, including a lower tolerance for mission risk and additional operational constraints that are associated only with human spacecraft. In addition, neither robotic nor human missions have been operated in the NRO regime specifically, and NROs exhibit dynamical characteristics that can differ significantly as compared to other halo orbits. Finally, multi-­-body orbits, such as libration point orbits, are identified to exist in a simplified orbit model known as the Circular Restricted Three Body Problem (CRTBP) and must then be re-­-solved in the full ephemeris model. As a result, the behavior of multi-­-body orbits cannot be effectively characterized within the classical two-­-body orbit dynamics framework more familiar to the human spaceflight community. In fact, a given NRO is not identified by a set of Keplerian orbit parameters, and a valid epoch specific state vector must be first obtained from a multi-body dynamical model. In this paper, the significant performance and operational challenges of conducting human missions to the NRO are evaluated. First, a systematic process for generating full ephemeris based ballistic NROs of various families is outlined to demonstrate the relative ease in which a multi-­-revolution orbit can be found for any epoch and for various orbit geometries. In the Earth-­-Moon system, NROs, which are halo orbits with close passage over a lunar pole, can exist with respect to libration point 1 (L1) or libration point 2 (L2) and are either from a North or South family orbit class with respect to the ecliptic. Second, the ability to maintain the orbit over the lifetime of a habitat mission by applying a reliable station-keeping strategy is investigated. The NRO, while similar to the quasi-­-halo orbits that the Artemis mission flew, requires an updated station keeping strategy. This is due to several dynamical differences such as the increased relative stability of the NRO compared to other halo orbits and the close passage over the lunar surface as shown in Figure 1. Multiple station-keeping strategies are being investigated to ensure a human spacecraft remains on a predictable path. As the NRO is not described in simple two-­-body parameters, analysis must determine the best strategy for targeting a reference NRO as well as how closely a future state should be constrained. In addition, costs will be minimized by determining maneuver directionality based on an identified pattern in the optimal station-keeping solutions or an analytically derived relationship. The candidate station-keeping algorithm must be stable and robust to environmental and vehicle uncertainties as well to navigation estimation and flight control execution errors. To that end, navigation accuracies, the impact on the station-keeping execution errors as well as other vehicle uncertainties need to be assessed. Starting with Orion, current navigation accuracies are evaluated and then navigation requirements are derived assuming a desired station-keeping propellant budget. Third, the performance requirements to and from the NRO are evaluated. Important parameters for developing expected propellant costs include epoch of operation, size and type of NRO, Earth departure and return constraints, as well as abort or early-­-return capability. Finally, rendezvous and proximity operations are vital aspects of multi-­-mission human exploration endeavors. The ability to conduct rendezvous and the associated propellant costs are assessed as well as the impacts of various profile assumptions including the location within the NRO the rendezvous is performed. The results of these studies will influence plans for international cooperation on both nearer term proving ground missions and beyond.

  7. CNES Strategic Plan for Space Traffic Control

    NASA Astrophysics Data System (ADS)

    Alby, Fernand

    2013-09-01

    The increasing orbital debris population represents a growing risk to operational satellites on-orbit and also to populations and properties on-ground. Today available space surveillance data allow a better implementation of protection activities which are now part of operational services. The overall frame of these activities at CNES is given by a strategic plan defining the long term views and the corresponding activities to be carried out during the next years. This plan, established in close cooperation with French Defence organizations, includes, among others, two operational space traffic control activities: prevention of on-orbit collisions and atmospheric re-entries predictions.This paper presents first the national organization relative to these activities together with the internal CNES process starting from a high level roadmap, up to a detailed action plan. This plan contains operational activities and supporting studies and models development.The content of this plan is given with a focus on operational activities dealing with space traffic control.

  8. Digital evaluation of orbital development after self-inflating hydrogel expansion in Chinese children with congenital microphthalmia.

    PubMed

    Hou, Zhijia; Xian, Junfang; Chang, Qinglin; Wei, Wenbin; Li, Dongmei

    2016-05-01

    Assessment of the growth of bony orbit in children with blind microphthalmia is essential to its management. In this study, variables were measured to evaluate the development of the bony microphthalmic orbits after treatment with self-inflating hydrogel expanders. This is a retrospective study with an interventional case series. Thirteen pediatric patients with congenital unilateral blind microphthalmia who had undergone tissue expansion with hydrogel expanders and computed tomography (CT) scanning before and after operation were included in the study. The orbital volume, depth, width, and height and retardation of the orbital rims before and after treatment were measured and analyzed using the iPlan Cranial Software. The mean age at the time of first implantation was 44 months (range, 3-113 months). Of the 13 patients, eleven received orbital expansion, while two received socket expansion. In the orbital expansion group, the mean microphthalmic/contralateral ratio (MCR) of orbital volume was 79.3% before surgery, which increased to 89.8% 3 years post operation (P < 0.001). The mean MCR of orbital width also increased from 88.8% to 91.8% (P = 0.003). The development of inferior and lateral rims showed the greatest retardation before treatment; the retardation of these two rims decreased significantly at the final measurement (P = 0.004). It is also noted that the development of the microphthalmic orbits was limited in the two patients who only underwent socket expansion. The affected orbit enlarged in children with congenital blind microphthalmia following treatment with hydrogel expanders; this suggested that microphthalmia-associated orbital asymmetry can be treated with self-inflating hydrogel expanders. Copyright © 2016 British Association of Plastic, Reconstructive and Aesthetic Surgeons. Published by Elsevier Ltd. All rights reserved.

  9. TDRSS-user orbit determination using batch least-squares and sequential methods

    NASA Astrophysics Data System (ADS)

    Oza, D. H.; Jones, T. L.; Hakimi, M.; Samii, Mina V.; Doll, C. E.; Mistretta, G. D.; Hart, R. C.

    1993-02-01

    The Goddard Space Flight Center (GSFC) Flight Dynamics Division (FDD) commissioned Applied Technology Associates, Incorporated, to develop the Real-Time Orbit Determination/Enhanced (RTOD/E) system on a Disk Operating System (DOS)-based personal computer (PC) as a prototype system for sequential orbit determination of spacecraft. This paper presents the results of a study to compare the orbit determination accuracy for a Tracking and Data Relay Satellite System (TDRSS) user spacecraft, Landsat-4, obtained using RTOD/E, operating on a PC, with the accuracy of an established batch least-squares system, the Goddard Trajectory Determination System (GTDS), and operating on a mainframe computer. The results of Landsat-4 orbit determination will provide useful experience for the Earth Observing System (EOS) series of satellites. The Landsat-4 ephemerides were estimated for the January 17-23, 1991, timeframe, during which intensive TDRSS tracking data for Landsat-4 were available. Independent assessments were made of the consistencies (overlap comparisons for the batch case and covariances and the first measurement residuals for the sequential case) of solutions produced by the batch and sequential methods. The forward-filtered RTOD/E orbit solutions were compared with the definitive GTDS orbit solutions for Landsat-4; the solution differences were less than 40 meters after the filter had reached steady state.

  10. TDRSS-user orbit determination using batch least-squares and sequential methods

    NASA Technical Reports Server (NTRS)

    Oza, D. H.; Jones, T. L.; Hakimi, M.; Samii, Mina V.; Doll, C. E.; Mistretta, G. D.; Hart, R. C.

    1993-01-01

    The Goddard Space Flight Center (GSFC) Flight Dynamics Division (FDD) commissioned Applied Technology Associates, Incorporated, to develop the Real-Time Orbit Determination/Enhanced (RTOD/E) system on a Disk Operating System (DOS)-based personal computer (PC) as a prototype system for sequential orbit determination of spacecraft. This paper presents the results of a study to compare the orbit determination accuracy for a Tracking and Data Relay Satellite System (TDRSS) user spacecraft, Landsat-4, obtained using RTOD/E, operating on a PC, with the accuracy of an established batch least-squares system, the Goddard Trajectory Determination System (GTDS), and operating on a mainframe computer. The results of Landsat-4 orbit determination will provide useful experience for the Earth Observing System (EOS) series of satellites. The Landsat-4 ephemerides were estimated for the January 17-23, 1991, timeframe, during which intensive TDRSS tracking data for Landsat-4 were available. Independent assessments were made of the consistencies (overlap comparisons for the batch case and covariances and the first measurement residuals for the sequential case) of solutions produced by the batch and sequential methods. The forward-filtered RTOD/E orbit solutions were compared with the definitive GTDS orbit solutions for Landsat-4; the solution differences were less than 40 meters after the filter had reached steady state.

  11. Viking Mars encounter

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Various phases of planetary operations related to the Viking mission to Mars are described. Topics discussed include: approach phase, Mars orbit insertion, prelanding orbital activities, separation, descent and landing, surface operations, surface sampling and operations starting, orbiter science and radio science, Viking 2, Deep Space Network and data handling.

  12. Options for Staging Orbits in Cis-Lunar Space

    NASA Technical Reports Server (NTRS)

    Whitley, Ryan; Martinez, Roland

    2015-01-01

    NASA has been studying options to conduct missions beyond Low Earth Orbit, but within the Earth-Moon system, in preparation for deep space exploration including human missions to Mars. Referred to as the Proving Ground, this arena of exploration activities will enable the development of human spaceflight systems and operations to satisfy future exploration objectives beyond the cis-lunar environment. One option being considered includes the deployment of a habitable element or elements, which could be used as a central location for aggregation of supplies and resources for human missions in cis-lunar space and beyond. Characterizing candidate orbit locations for this asset and the impacts on system design and mission operations is important in the overall assessment of the options being considered. The orbits described in this paper were initially selected by taking advantage of previous studies conducted by NASA and the work of other authors. In this paper orbits are assessed for their relative attractiveness based on various factors. First, a set of constraints related to the capability of the combined Orion and SLS system to deliver humans and cargo to and from the orbit are evaluated. Second, the ability to support potential lunar surface activities is considered. Finally, deployed assets intended to spend multiple years in the Proving Ground would ideally require minimal station keeping costs to reduce the mass budget allocated to this function. Additional mission design drivers include potential for uninterrupted communication with deployed assets, thermal, communications, and other operational implications. The results of the characterization and evaluation of the selected orbits indicate a Near Rectilinear Orbit (NRO) is an attractive candidate as an aggregation point or staging location for operations. In this paper, the NRO is further described in terms which balance a number of key attributes that favor a variety of mission classes to meet multiple, sometimes competing, constraints.

  13. Options for Staging Orbits in Cis-Lunar Space

    NASA Technical Reports Server (NTRS)

    Martinez, Roland; Whitley, Ryan

    2016-01-01

    NASA has been studying options to conduct missions beyond Low Earth Orbit, but within the Earth-Moon system, in preparation for deep space exploration including human missions to Mars. Referred to as the Proving Ground, this arena of exploration activities will enable the development of human spaceflight systems and operations to satisfy future exploration objectives beyond the cis-lunar environment. One option being considered includes the deployment of a habitable element or elements, which could be used as a central location for aggregation of supplies and resources for human missions in cis-lunar space and beyond. Characterizing candidate orbit locations for this asset and the impacts on system design and mission operations is important in the overall assessment of the options being considered. The orbits described in this paper were initially selected by taking advantage of previous studies conducted by NASA and the work of other authors. In this paper orbits are assessed for their relative attractiveness based on various factors. A set of constraints related to the capability of the combined Orion and SLS system to deliver humans and cargo to and from the orbit are evaluated. Deployed assets intended to spend multiple years in the Proving Ground would ideally require minimal station keeping costs to reduce the mass budget allocated to this function. Additional mission design drivers include eclipse frequency, potential for uninterrupted communication with deployed assets, thermal, attitude control, communications, and other operational implications. Also the ability to support potential lunar surface activities and excursion missions beyond Earth-Moon space is considered. The results of the characterization and evaluation of the selected orbits indicate a Near Rectilinear Orbit (NRO) is an attractive candidate as an aggregation point or staging location for operations. In this paper, the NRO is further described in terms which balance a number of key attributes that favor a variety of mission classes to meet multiple, sometimes competing, constraints.

  14. Evaluation of Landsat-4 orbit determination accuracy using batch least-squares and sequential methods

    NASA Astrophysics Data System (ADS)

    Oza, D. H.; Jones, T. L.; Feiertag, R.; Samii, M. V.; Doll, C. E.; Mistretta, G. D.; Hart, R. C.

    The Goddard Space Flight Center (GSFC) Flight Dynamics Division (FDD) commissioned Applied Technology Associates, Incorporated, to develop the Real-Time Orbit Determination/Enhanced (RTOD/E) system on a Disk Operating System (DOS)-based personal computer (PC) as a prototype system for sequential orbit determination of spacecraft. This paper presents the results of a study to compare the orbit determination accuracy for a Tracking and Data Relay Satellite (TDRS) System (TDRSS) user spacecraft, Landsat-4, obtained using RTOD/E, operating on a PC, with the accuracy of an established batch least-squares system, the Goddard Trajectory Determination System (GTDS), operating on a mainframe computer. The results of Landsat-4 orbit determination will provide useful experience for the Earth Observing System (EOS) series of satellites. The Landsat-4 ephemerides were estimated for the May 18-24, 1992, timeframe, during which intensive TDRSS tracking data for Landsat-4 were available. During this period, there were two separate orbit-adjust maneuvers on one of the TDRSS spacecraft (TDRS-East) and one small orbit-adjust maneuver for Landsat-4. Independent assessments were made of the consistencies (overlap comparisons for the batch case and covariances and the first measurement residuals for the sequential case) of solutions produced by the batch and sequential methods. The forward-filtered RTOD/E orbit solutions were compared with the definitive GTDS orbit solutions for Landsat-4; the solution differences were generally less than 30 meters after the filter had reached steady state.

  15. Evaluation of Landsat-4 orbit determination accuracy using batch least-squares and sequential methods

    NASA Technical Reports Server (NTRS)

    Oza, D. H.; Jones, T. L.; Feiertag, R.; Samii, M. V.; Doll, C. E.; Mistretta, G. D.; Hart, R. C.

    1993-01-01

    The Goddard Space Flight Center (GSFC) Flight Dynamics Division (FDD) commissioned Applied Technology Associates, Incorporated, to develop the Real-Time Orbit Determination/Enhanced (RTOD/E) system on a Disk Operating System (DOS)-based personal computer (PC) as a prototype system for sequential orbit determination of spacecraft. This paper presents the results of a study to compare the orbit determination accuracy for a Tracking and Data Relay Satellite (TDRS) System (TDRSS) user spacecraft, Landsat-4, obtained using RTOD/E, operating on a PC, with the accuracy of an established batch least-squares system, the Goddard Trajectory Determination System (GTDS), operating on a mainframe computer. The results of Landsat-4 orbit determination will provide useful experience for the Earth Observing System (EOS) series of satellites. The Landsat-4 ephemerides were estimated for the May 18-24, 1992, timeframe, during which intensive TDRSS tracking data for Landsat-4 were available. During this period, there were two separate orbit-adjust maneuvers on one of the TDRSS spacecraft (TDRS-East) and one small orbit-adjust maneuver for Landsat-4. Independent assessments were made of the consistencies (overlap comparisons for the batch case and covariances and the first measurement residuals for the sequential case) of solutions produced by the batch and sequential methods. The forward-filtered RTOD/E orbit solutions were compared with the definitive GTDS orbit solutions for Landsat-4; the solution differences were generally less than 30 meters after the filter had reached steady state.

  16. Engineering study for pallet adapting the Apollo laser altimeter and photographic camera system for the Lidar Test Experiment on orbital flight tests 2 and 4

    NASA Technical Reports Server (NTRS)

    Kuebert, E. J.

    1977-01-01

    A Laser Altimeter and Mapping Camera System was included in the Apollo Lunar Orbital Experiment Missions. The backup system, never used in the Apollo Program, is available for use in the Lidar Test Experiments on the STS Orbital Flight Tests 2 and 4. Studies were performed to assess the problem associated with installation and operation of the Mapping Camera System in the STS. They were conducted on the photographic capabilities of the Mapping Camera System, its mechanical and electrical interface with the STS, documentation, operation and survivability in the expected environments, ground support equipment, test and field support.

  17. The Southern Argentina Agile Meteor Radar Orbital System (SAAMER-OS): An Initial Sporadic Meteoroid Orbital Survey in the Southern Sky

    NASA Technical Reports Server (NTRS)

    Janches, D.; Close, S.; Hormaechea, J. L.; Swarnalingam, N.; Murphy, A.; O'Connor, D.; Vandepeer, B.; Fuller, B.; Fritts, D. C.; Brunini, C.

    2015-01-01

    We present an initial survey in the southern sky of the sporadic meteoroid orbital environment obtained with the Southern Argentina Agile MEteor Radar (SAAMER) Orbital System (OS), in which over three-quarters of a million orbits of dust particles were determined from 2012 January through 2015 April. SAAMER-OS is located at the southernmost tip of Argentina and is currently the only operational radar with orbit determination capability providing continuous observations of the southern hemisphere. Distributions of the observed meteoroid speed, radiant, and heliocentric orbital parameters are presented, as well as those corrected by the observational biases associated with the SAAMER-OS operating parameters. The results are compared with those reported by three previous surveys performed with the Harvard Radio Meteor Project, the Advanced Meteor Orbit Radar, and the Canadian Meteor Orbit Radar, and they are in agreement with these previous studies. Weighted distributions for meteoroids above the thresholds for meteor trail electron line density, meteoroid mass, and meteoroid kinetic energy are also considered. Finally, the minimum line density and kinetic energy weighting factors are found to be very suitable for meteoroid applications. The outcomes of this work show that, given SAAMERs location, the system is ideal for providing crucial data to continuously study the South Toroidal and South Apex sporadic meteoroid apparent sources.

  18. Defining Operational Space Suit Requirements for Commercial Orbital Spaceflight

    NASA Technical Reports Server (NTRS)

    Alpert, Brian K.

    2015-01-01

    As the commercial spaceflight industry transitions from suborbital brevity to orbital outposts, spacewalking will become a major consideration for tourists, scientists, and hardware providers. The challenge exists to develop a space suit designed for the orbital commercial spaceflight industry. The unique needs and requirements of this industry will drive space suit designs and costs that are unlike any existing product. Commercial space tourists will pay for the experience of a lifetime, while scientists may not be able to rely on robotics for all operations and external hardware repairs. This study was aimed at defining space suit operational and functional needs across the spectrum of spacewalk elements, identifying technical design drivers and establishing appropriate options. Recommendations from the analysis are offered for consideration

  19. GFO-1 Geophysical Data Record and Orbit Verifications for Global Change Studies

    NASA Technical Reports Server (NTRS)

    Shum, C. K.

    2000-01-01

    This final report summarizes the research work conducted under NASA's Physical Oceanography Program, entitled, GFO-1 Geophysical Data Record And Orbit Verifications For Global Change Studies, for the investigation time period from December 1, 1997 through November 30, 2000. The primary objectives of the investigation include providing verification and improvement for the precise orbit, media, geophysical, and instrument corrections to accurately reduce U.S. Navy's Geosat-Followon-1 (GFO-1) mission radar altimeter data to sea level measurements. The status of the GFO satellite (instrument and spacecraft operations, orbital tracking and altimeter) is summarized. GFO spacecraft has been accepted by the Navy from Ball Aerospace and has been declared operational since November, 2000. We have participated in four official GFO calibration/validation periods (Cal/Val I-IV), spanning from June 1999 through October 2000. Results of verification of the GFO orbit and geophysical data record measurements both from NOAA (IGDR) and from the Navy (NGDR) are reported. Our preliminary results indicate that: (1) the precise orbit (GSFC and OSU) can be determined to approx. 5 - 6 cm rms radially using SLR and altimeter crossovers; (2) estimated GFO MOE (GSFC or NRL) radial orbit accuracy is approx. 7 - 30 cm and Operational Doppler orbit accuracy is approx. 60 - 350 cm. After bias and tilt adjustment (1000 km arc), estimated Doppler orbit accuracy is approx. 1.2 - 6.5 cm rms and the MOE accuracy is approx. 1.0 - 2.3 cm; (3) the geophysical and media corrections have been validated versus in situ measurements and measurements from other operating altimeters (T/P and ERS-2). Altimeter time bias is insignificant with 0-2 ms. Sea state bias is about approx. 3 - 4.5% of SWH. Wet troposphere correction has approx. 1 cm bias and approx. 3 cm rms when compared with ERS-2 data. Use of GIM and IRI95 provide ionosphere correction accurate to 2-3 cm rms during medium to high solar activities; (4) the noise of the GFO altimeter data (uncorrected SSH) is about 15 mm, compared to 19 min for ERS-2, and 12 min for TOPEX. It is anticipated that the operational GFO-1 altimeter data will contribute to a number of researches in physical oceanography. A list of relevant presentations and publications is attached.

  20. Preliminary analysis of the benefits derived to US Air Force spacecraft from on-orbit refueling

    NASA Astrophysics Data System (ADS)

    Smith, Scott

    1993-02-01

    This analysis was undertaken during FY-91 as a preliminary step to identify potential benefits from refueling Air Force satellites on orbit. Both economic and operational benefits were included. Operational benefits were related in economic terms to allow evaluation. All economic comparisons were made using FY-91 costs. An additional purpose of the effort was to identify the preferred mission parameters, for an on-orbit refueling system. A companion study was being concurrently conducted by SSD/XRP and NASA/JPL to develop a hardware concept for an on-orbit refueling system. The mass estimates for refueling missions obtained from the companion study were used in conducting the economic analyses of this benefits study. For this study, on-orbit refueling was based on the concept developed in the companion JPL study. The concept involves launching an S/C carrying fuel that would be transferred to another 'target' S/C which is already in orbit. The two S/C would then rendezvous, dock, and transfer fuel. Another fluid, such as a cryogenic, might be included if needed by the target S/C. The hardware concept for refueling was intended to minimize costs. The re-fueler S/C was designated to be expendable and would contain only the minimal capabilities. It would be launched into the orbit plane and altitude of the target S/C(s). The re-fueler S/C would rendezvous and dock with the target S/C and the fluid transfer would occur. When the refueling mission was completed, the re-fueler S/C would be ejected from the orbit. In order to optimize launch costs, some missions involved launching two re-fueler S/C on the LV. In this case the second re-fueler S/C would be placed in a storage orbit until needed.

  1. Preliminary analysis of the benefits derived to US Air Force spacecraft from on-orbit refueling

    NASA Technical Reports Server (NTRS)

    Smith, Scott

    1993-01-01

    This analysis was undertaken during FY-91 as a preliminary step to identify potential benefits from refueling Air Force satellites on orbit. Both economic and operational benefits were included. Operational benefits were related in economic terms to allow evaluation. All economic comparisons were made using FY-91 costs. An additional purpose of the effort was to identify the preferred mission parameters, for an on-orbit refueling system. A companion study was being concurrently conducted by SSD/XRP and NASA/JPL to develop a hardware concept for an on-orbit refueling system. The mass estimates for refueling missions obtained from the companion study were used in conducting the economic analyses of this benefits study. For this study, on-orbit refueling was based on the concept developed in the companion JPL study. The concept involves launching an S/C carrying fuel that would be transferred to another 'target' S/C which is already in orbit. The two S/C would then rendezvous, dock, and transfer fuel. Another fluid, such as a cryogenic, might be included if needed by the target S/C. The hardware concept for refueling was intended to minimize costs. The re-fueler S/C was designated to be expendable and would contain only the minimal capabilities. It would be launched into the orbit plane and altitude of the target S/C(s). The re-fueler S/C would rendezvous and dock with the target S/C and the fluid transfer would occur. When the refueling mission was completed, the re-fueler S/C would be ejected from the orbit. In order to optimize launch costs, some missions involved launching two re-fueler S/C on the LV. In this case the second re-fueler S/C would be placed in a storage orbit until needed.

  2. International Space Station Nickel-Hydrogen Battery Startup and Initial Performance

    NASA Technical Reports Server (NTRS)

    Dalton, Penni; Cohen, Fred; Hajela, Gyan

    2002-01-01

    The Battery Orbital Replacement Unit (ORU) was designed to meet the following requirements: a 6.5-year design life, 38,000 charge/discharge Low Earth Orbit cycles, 81-Amp-hr nameplate capacity, 4 kWh nominal storage capacity, contingency orbit capability, an operating temperature of 5 +/- 5 C standard orbit and 5+5/-10 C contingency orbit, a non-operating temperature of -25 to +30 C, a five-year Mean Time between failure, an on-orbit replacement using ISS robotic interface, and one launch to orbit and one return to ground. The ISS electrical power system is successfully maintaining power for all on-board loads. ISS Eclipse power is currently supplied by six Ni-H2 batteries (12 ORUs), which are operating nominally.

  3. Orbital transfer vehicle launch operations study. Volume 2: Detailed summary

    NASA Technical Reports Server (NTRS)

    1986-01-01

    A series of Operational Design Drivers were identified. Several of these could have significant impact(s) on program costs. These recommendations, for example, include such items as: complete factory assembly and checkout prior to shipment to the ground launch site to make significant reductions in time required at the launch site as well as overall manpower required to do this work; minimize use of nonstandard equipment when orbiter provided equipment is available; and require commonality (or interchangeability) of subsystem equipment elements that are common to the space station, Orbit Maneuvering Vehicles, and/or Orbit Transfer Vehicles. Several additional items were identified that will require a significant amount of management attention (and direction) to resolve. Key elements of the space based processing plans are discussed.

  4. Space Construction Experiment Definition Study (SCEDS), part 1. Volume 2: Study results

    NASA Technical Reports Server (NTRS)

    1981-01-01

    A basic Space Shuttle flight experiment which will provide needed data on the construction of large space systems from the Orbiter was defined. The predicted dynamic behavior of a representative large structure, on-orbit construction operations, and Orbiter control during and after construction were studied. Evolutionary or supplemental flight experiments for the development or augmentation of a basic flight experiment were identified and defined. The study was divided into six major tasks with appropriate sub-tasks noted.

  5. Orbital refill of propulsion vehicle tankage

    NASA Technical Reports Server (NTRS)

    Merino, F.; Risberg, J. A.; Hill, M.

    1980-01-01

    Techniques for orbital refueling of space based vehicles were developed and experimental programs to verify these techniques were identified. Orbital refueling operations were developed for two cryogenic orbital transfer vehicles (OTV's) and an Earth storable low thrust liquid propellant vehicle. Refueling operations were performed assuming an orbiter tanker for near term missions and an orbital depot. Analyses were conducted using liquid hydrogen and N2O4. The influence of a pressurization system and acquisition device on operations was also considered. Analyses showed that vehicle refill operations will be more difficult with a cryogen than with an earth storable. The major elements of a successful refill with cryogens include tank prechill and fill. Propellant quantities expended for tank prechill appear to to insignificant. Techniques were identified to avoid loss of liquid or excessive tank pressures during refill. It was determined that refill operations will be similar whether or not an orbiter tanker or orbital depot is available. Modeling analyses were performed for prechill and fill tests to be conducted assuming the Spacelab as a test bed, and a 1/10 scale model OTV (with LN2 as a test fluid) as an experimental package.

  6. The METOP-A Orbit Acquisition Strategy and its LEOP Operational Experience

    NASA Technical Reports Server (NTRS)

    Merz, K.; Serrano, M. A. Martin; Kuijper, D.; Matatoros, M. A. Garcia

    2007-01-01

    Europe's first polar-orbiting weather satellite, METOPA, was launched by a Soyuz launcher from Baikonur Cosmodrome on the 19th of October of 2006. The routine operations of METOP-A are conducted by EUMETSAT (European Organization for Exploitation of Meteorological Satellites) in the frame of the European Polar System mission (EPS). The METOP-A Launch and Early Orbit Phase (LEOP) operations have been performed by ESA/ESOC. The Flight Dynamics Orbit Determination and Control team (OD&C) at ESOC was in charge of correcting the S/C orbit as delivered by the launcher in such a way that EUMETSAT would be able to acquire the reference orbit with a drift-stop manoeuvre approximately two weeks after a LEOP of 3 days and Hand-Over to the EUMETSAT Control Centre (EUMETSAT-CC) in Darmstadt, Germany. The various strict constraints and the short amount of time available for ESOC operations made this task challenging. Several strategies were prepared before launch and analysed during LEOP based on the achieved injection orbit. This paper presents the different manoeuvre strategies investigated and finally applied to acquire the operational orbit, reporting as well the details of its execution and final achieved state.

  7. A Modernized Approach to Meet Diversified Earth Observing System (EOS) AM-1 Mission Requirements

    NASA Technical Reports Server (NTRS)

    Newman, Lauri Kraft; Hametz, Mark E.; Conway, Darrel J.

    1998-01-01

    From a flight dynamics perspective, the EOS AM-1 mission design and maneuver operations present a number of interesting challenges. The mission design itself is relatively complex for a low Earth mission, requiring a frozen, Sun-synchronous, polar orbit with a repeating ground track. Beyond the need to design an orbit that meets these requirements, the recent focus on low-cost, "lights out" operations has encouraged a shift to more automated ground support. Flight dynamics activities previously performed in special facilities created solely for that purpose and staffed by personnel with years of design experience are now being shifted to the mission operations centers (MOCs) staffed by flight operations team (FOT) operators. These operators' responsibilities include flight dynamics as a small subset of their work; therefore, FOT personnel often do not have the experience to make critical maneuver design decisions. Thus, streamlining the analysis and planning work required for such a complicated orbit design and preparing FOT personnel to take on the routine operation of such a spacecraft both necessitated increasing the automation level of the flight dynamics functionality. The FreeFlyer(trademark) software developed by AI Solutions provides a means to achieve both of these goals. The graphic interface enables users to interactively perform analyses that previously required many parametric studies and much data reduction to achieve the same result. In addition, the fuzzy logic engine .enables the simultaneous evaluation of multiple conflicting constraints, removing the analyst from the loop and allowing the FOT to perform more of the operations without much background in orbit design. Modernized techniques were implemented for EOS AM-1 flight dynamics support in several areas, including launch window determination, orbit maintenance maneuver control strategies, and maneuver design and calibration automation. The benefits of implementing these techniques include increased fuel available for on-orbit maneuvering, a simplified orbit maintenance process to minimize science data downtime, and an automated routine maneuver planning process. This paper provides an examination of the modernized techniques implemented for EOS AM-1 to achieve these benefits.

  8. A modernized approach to meet diversified earth observing system (EOS) AM-1 mission requirements

    NASA Technical Reports Server (NTRS)

    Newman, Lauri Kraft; Hametz, Mark E.; Conway, Darrel J.

    1998-01-01

    From a flight dynamics perspective, the EOS AM-1 mission design and maneuver operations present a number of interesting challenges. The mission design itself is relatively complex for a low Earth mission, requiring a frozen, Sun-synchronous, polar orbit with a repeating ground track. Beyond the need to design an orbit that meets these requirements, the recent focus on low-cost, 'lights out' operations has encouraged a shift to more automated ground support. Flight dynamics activities previously performed in special facilities created solely for that purpose and staffed by personnel with years of design experience are now being shifted to the mission operations centers (MOCs) staffed by flight operations team (FOT) operators. These operators' responsibilities include flight dynamics as a small subset of their work; therefore, FOT personnel often do not have the experience to make critical maneuver design decisions. Thus, streamlining the analysis and planning work required for such a complicated orbit design and preparing FOT personnel to take on the routine operation of such a spacecraft both necessitated increasing the automation level of the flight dynamics functionality. The FreeFlyer(TM) software developed by AI Solutions provides a means to achieve both of these goals. The graphic interface enables users to interactively perform analyses that previously required many parametric studies and much data reduction to achieve the same result In addition, the fuzzy logic engine enables the simultaneous evaluation of multiple conflicting constraints, removing the analyst from the loop and allowing the FOT to perform more of the operations without much background in orbit design. Modernized techniques were implemented for EOS AM-1 flight dynamics support in several areas, including launch window determination, orbit maintenance maneuver control strategies, and maneuver design and calibration automation. The benefits of implementing these techniques include increased fuel available for on-orbit maneuvering, a simplified orbit maintenance process to minimize science data downtime, and an automated routine maneuver planning process. This paper provides an examination of the modernized techniques implemented for EOS AM-1 to achieve these benefits.

  9. Payload/orbiter contamination control requirement study, volume 1, exhibit A

    NASA Technical Reports Server (NTRS)

    Bareiss, L. E.; Hooper, V. W.; Rantanen, R. O.; Ress, E. B.

    1974-01-01

    This study is to identify and quantify the expected molecular and particulate on orbit contaminant environment for selected shuttle payloads as a result of major spacelab and shuttle orbiter contaminant sources. This investigation reviews individual payload susceptibilities to contamination, identifies the combined induced environment, identifies the risk of spacelab/payload critical surface(s) degradation, and provides preliminary contamination recommendations. It also establishes limiting factors which may depend upon operational activities associated with the payloads, spacelab, and the shuttle orbiter interface or upon independent payload functional activities.

  10. Conditioning of BPM pickup signals for operations of the Duke storage ring with a wide range of single-bunch current

    NASA Astrophysics Data System (ADS)

    Xu, Wei; Li, Jing-Yi; Huang, Sen-Lin; Z. Wu, W.; Hao, H.; P., Wang; K. Wu, Y.

    2014-10-01

    The Duke storage ring is a dedicated driver for the storage ring based oscillator free-electron lasers (FELs), and the High Intensity Gamma-ray Source (HIGS). It is operated with a beam current ranging from about 1 mA to 100 mA per bunch for various operations and accelerator physics studies. High performance operations of the FEL and γ-ray source require a stable electron beam orbit, which has been realized by the global orbit feedback system. As a critical part of the orbit feedback system, the electron beam position monitors (BPMs) are required to be able to precisely measure the electron beam orbit in a wide range of the single-bunch current. However, the high peak voltage of the BPM pickups associated with high single-bunch current degrades the performance of the BPM electronics, and can potentially damage the BPM electronics. A signal conditioning method using low pass filters is developed to reduce the peak voltage to protect the BPM electronics, and to make the BPMs capable of working with a wide range of single-bunch current. Simulations and electron beam based tests are performed. The results show that the Duke storage ring BPM system is capable of providing precise orbit measurements to ensure highly stable FEL and HIGS operations.

  11. Mars Molniya Orbit Atmospheric Resource Mining. [FY 16 NIAC Phase I Project

    NASA Technical Reports Server (NTRS)

    Mueller, Robert P.; Sforzo, Brandon; Braun, Robert D.; Sibille, Laurent

    2017-01-01

    This NASA Innovative Advanced Concepts (NIAC) Phase I study examined the revolutionary concept of performing resource collection and utilization during Mars orbital operations in order to enable the landing of large payloads. An exploration architecture was developed, out of which several mission alternatives were developed. Concepts of operations were then developed for each mission alternative, followed by concepts for spacecraft systems, which were traded to assess their feasibility. A novel architecture using Mars Molniya Orbit Atmospheric Resource Mining is feasible to enable an Earth-independent and pioneering, permanent human presence on Mars by providing a reusable, single-stage-to-orbit transportation system. This will allow cargo and crew to be routinely delivered to and from Mars without transporting propellants from Earth.In Phase I, our study explored how electrical energy could be harnessed from the kinetic energy of the incoming spacecraft and then be used to produce the oxygen necessary for landing. This concept of operations is revolutionary in that its focus is on using in situ resources in complementary and varied forms: the upper atmosphere of Mars is used for aerocapture, which is followed by aerobraking, the kinetic energy of the spacecraft is transformed into usable electrical energy during aerobraking, and the atmospheric composition is the source of oxidizer for a landing under supersonic retropropulsion. This NASA Innovative Advanced Concepts (NIAC) Phase I study explores a novel mission architecture to establish routine, Earth-independent transfer of large mass payloads between Earth and the Mars surface and back to Mars orbit. The first stage of routine mission operations involves an atmospheric resource mining aerobraking campaign following aerocapture into a highly elliptical Mars orbit. During each pass through the atmosphere, the vehicle ingests the atmospheric oxidizer and stores it onboard, using solid oxide electrolysis to convert the primarily CO2 atmosphere into usable O2 for propellant. Power is made available through the use of magnetohydrodynamic energy generation, which converts the motion of the plasma in the shock later into usable electrical energy. Upon termination of the aerobraking sequence, the descent vehicle detaches from the orbit stack, deorbits, and executes the entry, descent, and landing sequence. Hypersonic deceleration is achieved via a deployable heat shield to lower the vehicle ballistic coefficient, and supersonic and subsonic deceleration are achieved via retropropulsion. Mars surface operations involve resource mining of the Martian regolith to produce CH4 and O2 propellant to be used for the subsequent MDAV ascent back to high Mars orbit (HMO) providing an apoapsis raise maneuver to initialize the aerobraking sequence, in addition to providing fuel from the Mars surface for EDL propulsive descent. The Resource Collector Vehicle (RCV), which is used for the orbital mining operations, is raised back to HMO via onboard deployable augmented solar electric propulsion. Concepts of operations were developed for each mission alternative, to evaluate between them and assess feasibility.

  12. Spacecraft servicing demonstration plan

    NASA Technical Reports Server (NTRS)

    Bergonz, F. H.; Bulboaca, M. A.; Derocher, W. L., Jr.

    1984-01-01

    A preliminary spacecraft servicing demonstration plan is prepared which leads to a fully verified operational on-orbit servicing system based on the module exchange, refueling, and resupply technologies. The resulting system can be applied at the space station, in low Earth orbit with an orbital maneuvering vehicle (OMV), or be carried with an OMV to geosynchronous orbit by an orbital transfer vehicle. The three phase plan includes ground demonstrations, cargo bay demonstrations, and free flight verifications. The plan emphasizes the exchange of multimission modular spacecraft (MMS) modules which involves space repairable satellites. Three servicer mechanism configurations are the engineering test unit, a protoflight quality unit, and two fully operational units that have been qualified and documented for use in free flight verification activity. The plan balances costs and risks by overlapping study phases, utilizing existing equipment for ground demonstrations, maximizing use of existing MMS equipment, and rental of a spacecraft bus.

  13. Integrated orbital servicing study for low-cost payload programs. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Derocher, W. L., Jr.

    1975-01-01

    Various operating methodologies to achieve low-cost space operations were investigated as part of the Space Transportation System (STS) planning. The emphasis was to show that the development investment, initial fleet costs, and supporting facilities for the STS could be effectively offset by exploiting the capabilities of the STS to satisfy mission requirements and reduce the cost of payload programs. The following major conclusions were reached: (1) the development of an on-orbit servicer maintenance system is compatible with many spacecraft programs and is recommended as the most cost-effective system, (2) spacecraft can be designed to be serviceable with acceptable design, weight, volume, and cost effects, (3) use of on-orbit servicing over a 12 year period results in savings ranging between four and nine billion dollars, (4) the pivoting arm on-orbit servicer was selected and a preliminary design was prepared, (5) orbital maintenance has no significant impact on the STS.

  14. Operations analysis (study 2.6). Volume 4: Computer specification; logistics of orbiting vehicle servicing (LOVES)

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The logistics of orbital vehicle servicing computer specifications was developed and a number of alternatives to improve utilization of the space shuttle and the tug were investigated. Preliminary results indicate that space servicing offers a potential for reducing future operational and program costs over ground refurbishment of satellites. A computer code which could be developed to simulate space servicing is presented.

  15. GEODYN operations description, volume 3. [computer program for estimation of orbit and geodetic parameters

    NASA Technical Reports Server (NTRS)

    Martin, T. V.; Mullins, N. E.

    1972-01-01

    The operating and set-up procedures for the multi-satellite, multi-arc GEODYN- Orbit Determination program are described. All system output is analyzed. The GEODYN Program is the nucleus of the entire GEODYN system. It is a definitive orbit and geodetic parameter estimation program capable of simultaneously processing observations from multiple arcs of multiple satellites. GEODYN has two modes of operation: (1) the data reduction mode and (2) the orbit generation mode.

  16. Space Operations Center - A concept analysis

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The Space Operations Center (SOC) which is a concept for a Shuttle serviced, permanent, manned facility in low earth orbit is viewed as a major candidate for the manned space flight following the completion of an operational Shuttle. The primary objectives of SOC are: (1) the construction, checkout, and transfer to operational orbit of large, complex space systems, (2) on-orbit assembly, launch, recovery, and servicing of manned and unmanned spacecraft, (3) managing operations of co-orbiting free-flying satellites, and (4) the development of reduced dependence on earth for control and resupply. The structure of SOC, a self-contained orbital facility containing several Shuttle launched modules, includes the service, habitation, and logistics modules as well as construction, and flight support facilities. A schedule is proposed for the development of SOC over ten years and costs for the yearly programs are estimated.

  17. Use of computed tomography to assess volume change after endoscopic orbital decompression for Graves' ophthalmopathy.

    PubMed

    Schiff, Bradley A; McMullen, Caitlin P; Farinhas, Joaquim; Jackman, Alexis H; Hagiwara, Mari; McKellop, Jason; Lui, Yvonne W

    2015-01-01

    Orbital decompression is frequently performed in the management of patients with sight-threatening and disfiguring Graves' ophthalmopathy. The quantitative measurements of the change in orbital volume after orbital decompression procedures are not definitively known. Furthermore, the quantitative effect of septal deviation on volume change has not been previously analyzed. To provide quantitative measurement of orbital volume change after medial and inferior endoscopic decompression and describe a straightforward method of measuring this change using open-source technologies. A secondary objective was to assess the effect of septal deviation on orbital volume change. A retrospective review was performed on all patients undergoing medial and inferior endoscopic orbital decompression for Graves' ophthalmopathy at a tertiary care academic medical center. Pre-operative and post-operative orbital volumes were calculated from computed tomography (CT) data using a semi-automated segmenting technique and Osirix™, an open-source DICOM reader. Data were collected for pre-operative and post-operative orbital volumes, degree of septal deviation, time to follow-up scan, and individual patient Hertel scores. Nine patients (12 orbits) were imaged before and after decompression. Mean pre-operative orbital volume was 26.99 cm(3) (SD=2.86 cm(3)). Mean post-operative volume was 33.07 cm(3) (SD=3.96 cm(3)). The mean change in volume was 6.08 cm(3) (SD=2.31 cm(3)). The mean change in Hertel score was 4.83 (SD=0.75). Regression analysis of change in volume versus follow-up time to imaging indicates that follow-up time to imaging has little effect on change in volume (R=-0.2), and overall mean maximal septal deviation toward the operative side was -0.5mm. Negative values were attributed to deviation away form the operative site. A significant correlation was demonstrated between change in orbital volume and septal deviation distance site (R=0.66), as well as between change in orbital volume and septal deviation angle (R=0.67). Greater volume changes were associated with greater degree of septal deviation away from the surgical site, whereas smaller volume changes were associated with greater degree of septal deviation toward the surgical site. A straightforward, semi-automated segmenting technique for measuring change in volume following endoscopic orbital decompression is described. This method proved useful in determining that a mean increase of approximately 6 cm in volume was achieved in this group of patients undergoing medial and inferior orbital decompression. Septal deviation appears to have an effect on the surgical outcome and should be considered during operative planning. Copyright © 2015 Elsevier Inc. All rights reserved.

  18. Low energy stage study. Volume 5: Program study cost elements and appendices. [orbital launching of space shuttle payloads

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The methodology and rationale used in the development of costs for engineering, manufacturing, testing and operating a low thrust system for placing automated shuttle payloads into earth orbits are described. Cost related information for the recommended propulsion approach is included.

  19. Manned geosynchronous mission requirements and systems analysis study extension

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Turnaround requirements for the manned orbital transfer vehicle (MOTV) baseline and alternate concepts with and without a space operations center (SOC) are defined. Manned orbital transfer vehicle maintenance, refurbishment, resupply, and refueling are considered as well as the most effective combination of ground based and space based turnaround activities. Ground and flight operations requirements for abort are identified as well as low cost approaches to space and ground operations through maintenance and missions sensitivity studies. The recommended turnaround mix shows that space basing MOTV at SOC with periodic return to ground for overhaul results in minimum recurring costs. A pressurized hangar at SOC reduces labor costs by approximately 50%.

  20. Framework for the Integration of Multi-Instrument Pipelines in the BepiColombo Science Operations Control System

    NASA Astrophysics Data System (ADS)

    Pérez-López, F.; Vallejo, J. C.; Martínez, S.; Ortiz, I.; Macfarlane, A.; Osuna, P.; Gill, R.; Casale, M.

    2015-09-01

    BepiColombo is an interdisciplinary ESA mission to explore the planet Mercury in cooperation with JAXA. The mission consists of two separate orbiters: ESA's Mercury Planetary Orbiter (MPO) and JAXA's Mercury Magnetospheric Orbiter (MMO), which are dedicated to the detailed study of the planet and its magnetosphere. The MPO scientific payload comprises eleven instruments packages covering different disciplines developed by several European teams. This paper describes the design and development approach of the framework required to support the operation of the distributed BepiColombo MPO instruments pipelines, developed and operated from different locations, but designed as a single entity. An architecture based on primary-redundant configuration, fully integrated into the BepiColombo Science Operations Control System (BSCS), has been selected, where some instrument pipelines will be operated from the instrument team's data processing centres, having a pipeline replica that can be run from the Science Ground Segment (SGS), while others will be executed as primary pipelines from the SGS, adopting the SGS the pipeline orchestration role.

  1. A Comprehensive Orbit Reconstruction for the Galileo Prime Mission in the J2000 System

    NASA Technical Reports Server (NTRS)

    Jacobson, Robert A.; Haw, Robert J.; McElrath, Tim P.; Antreasian, Peter G.

    1999-01-01

    The Galileo spacecraft arrived at Jupiter in December of 1995 to begin an orbital tour of the Jovian system. The objective of the tour was up close study of the planet, its satellites, and its magnetosphere. The spacecraft completed its 11 orbit prime mission in November of 1997 having had 16 successful close encounters with the Galilean satellites (including two prior to Jupiter orbit insertion). Galileo continues to operate and will have made an additional 10 orbits of Jupiter by the date of this Conference. Earlier papers discuss the determination of the spacecraft orbit in support of mission operations from arrival at Jupiter through the first 9 orbits. In this paper we re-examine those earlier orbits and extend the analysis through orbit 12, the first orbit of the Galileo Europa Mission (GEM). The objective of our work is the reconstruction of the spacecraft trajectory together with the development of a consistent set of ephemerides for the Galilean satellites. As a necessary byproduct of the reconstruction we determine improved values for the Jovian system gravitational parameters and for the Jupiter pole orientation angles. Our preliminary analyses have already led to many of the results reported in the scientific literature. Unlike the Galileo Navigation Team which operates in the EME-1950 coordinate system, we elected to work in the (J2000) International Celestial Reference Frame (ICRF), the reference frame of the current JPL planetary and satellite ephemerides as well as the standard frame of the international astronomical and planetary science community. Use of this frame permits more precise modelling of the spacecraft and satellite observations. Moreover, it is the frame of choice for all other operational JPL missions and will probably be the frame for future missions for some time. Consequently, our adoption of the ICRF will facilitate the combination of our results with any obtained from future missions (e.g. the proposed Europa Orbiter mission). In addition, our results may be used by the science community, without need of a reference frame conversion.

  2. Space Construction Experiment Definition Study (SCEDS), part 1. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Definition was completed on a basic flight experiment which will provide data on the construction of large space systems from the orbiter which could not be practicably obtained from ground tests. Dynamic behavior of a representative large structure was predicted. On-orbit construction operations were studied. Orbiter control during and after construction was investigated. Evolutionary or supplemental flight experiments for the development of augmentation of a basic flight experiment were identified and defined.

  3. Commercial Application of In-Space Assembly

    NASA Technical Reports Server (NTRS)

    Lymer, John; Hanson, Mark; Tadros, Al; Boccio, Joel; Hollenstein, Bruno; Emerick, Ken; Doughtery, Sean; Doggett, Bill; Dorsey, John T.; King, Bruce D.; hide

    2016-01-01

    In-Space assembly (ISA) expands the opportunities for cost effective emplacement of systems in space. Currently, spacecraft are launched into space and deploy into their operational configuration through a carefully choreographed sequence of operations. The deployment operation dictates the arrangement of the primary systems on the spacecraft, limiting the ability to take full advantage of launch vehicles volume and mass capability. ISA enables vastly different spacecraft architectures and emplacement scenarios to be achieved, including optimal launch configurations ranging from single launch and assembly to on-orbit aggregation of multiple launches at different orbital locations and times. The spacecraft can be visited at different orbital locations and times to effect expansion and maintenance of an operational capability. To date, the primary application of ISA has been in large programs funded by government organizations, such as the International Space Station. Recently, Space Systems Loral (SSL) led a study funded by the Defense Advanced Research Projects Agency (DARPA), called Dragonfly, to investigate the commercial applicability and economic advantages of ISA. In the study, it was shown that ISA enables SSL to double the capability of a commercial satellite system by taking advantage of alternate packaging approaches for the reflectors. The study included an ultra-light-weight robotic system, derived from Mars manipulator designs, to complete assembly of portions of the antenna system using a tool derived from DARPA orbital express and National Aeronautics and Space Administration (NASA) automated structural assembly experience. The mechanical connector that enables robotic ISA takes advantage of decades of development by NASA from the 1970's to 1980's during the Space Station Freedom program, the precursor to the ISS. The mechanical connector was originally designed for rapid astronaut assembly while also providing a high quality structural connection with linear load deflection response. The paper will discuss the business case for ISA, the general approach taken to exploit on-orbit assembly in the GEO communication satellite market, and the concept of operations associated with the ISA approach, thus laying the foundation for ISA to become an accepted operational approach for commercial in-space operations.

  4. Disposal strategy for the geosynchronous orbits of the Beidou Navigation Satellite System

    NASA Astrophysics Data System (ADS)

    Tang, Jingshi; Liu, Lin

    Beidou Navigation Satellite System (BDS) is China's navigation satelite system. It is now operational for navigation service in China and Asia-Pacific region and is due to be fully operational as a global navigation system by 2020. Unlike other navigation satellite systems, BDS consists of both 12-hour medium Earth orbit and 24-hour geosynchronous orbit. To sustain a safe environment for the navigation satellites, the end-of-life satellites must be disposed appropriately so they do not pose potential dangers to the operational satellites. There are currently two strategies for the disposal orbit. One is to put the disposed satellite in a graveyard orbit that has a safe distance from the operational satellites. It is often applied in geosynchronous orbits and such graveyard orbit can always maintain a safe distance even for a few centuries. This strategy is also currently adopted by GPS, yet recent researches show a re-entry orbit can sometimes be a better alternative. The interaction of Earth oblateness and lunisolar gravitation can lead to a rapid increase in the orbit eccentricity such that by proper design the disposed GPS satellite can be cleared out by re-entry into the atmosphere. In this work we focus on the disposal strategy for BDS geosynchronous orbit, which consists of the equatorial stationary orbit (GEO) and the inclined orbit (IGSO). We show that these two orbits are essentially in two different dynamical environments and evolve quite distinctly over a long period of time. Taking advantage of the dynamic nature, we apply the graveyard orbit and the re-entry orbit to GEO and IGSO respectively and propose appropriate disposal strategies accordingly.

  5. Manned orbital systems concepts study. Book 3: Configurations for extended duration missions. [mission planning and project planning for space missions

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Mission planning, systems analysis, and design concepts for the Space Shuttle/Spacelab system for extended manned operations are described. Topics discussed are: (1) payloads, (2) spacecraft docking, (3) structural design criteria, (4) life support systems, (5) power supplies, and (6) the role of man in long duration orbital operations. Also discussed are the assembling of large structures in space. Engineering drawings are included.

  6. Space Operations Center system analysis study extension. Volume 4, book 1: SOC system analysis report

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The Space Operations Center (SOC) orbital space station missions are analyzed. Telecommunications missions, space science, Earth sensing, and space testing missions, research and applications missions, defense missions, and satellite servicing missions are modeled and mission needs discussed. The satellite servicing missions are analyzed in detail, including construction and servicing equipment requirements, mission needs and benefits, differential drag characteristics of co-orbiting satellites, and satellite servicing transportation requirements.

  7. Maintaining Aura's Orbit Requirements While Performing Orbit Maintenance Maneuvers Containing an Orbit Normal Delta-V Component

    NASA Technical Reports Server (NTRS)

    Johnson, Megan R.; Petersen, Jeremy D.

    2014-01-01

    The Earth Observing System (EOS) Afternoon Constellation consists of five member missions (GCOM-W1, Aqua, CALIPSO, CloudSat, and Aura), each of which maintain a frozen, sun-synchronous orbit with a 16-day repeating ground track that follows the Worldwide Reference System-2 (WRS-2). Under nominal science operations for Aura, the propulsion system is oriented such that the resultant thrust vector is aligned 13.493 degrees away from the velocity vector along the yaw axis. When performing orbit maintenance maneuvers, the spacecraft performs a yaw slew to align the thrust vector in the appropriate direction. A new Drag Make Up (DMU) maneuver operations scheme has been implemented for Aura alleviating the need for the 13.493 degree yaw slew. The focus of this investigation is to assess the impact that no-slew DMU maneuver operations will have on Aura's Mean Local Time (MLT) which drives the required along track separation between Aura and the constellation members, as well as Aura's frozen orbit properties, eccentricity and argument of perigee. Seven maneuver strategies were analyzed to determine the best operational approach. A mirror pole strategy, with maneuvers alternating at the North and South poles, was implemented operationally to minimize impact to the MLT. Additional analysis determined that the mirror pole strategy could be further modified to include frozen orbit maneuvers and thus maintain both MLT and the frozen orbit properties under noslew operations.

  8. Tracking and data relay satellite system configuration and tradeoff study. Volume 4: TDRS system operation and control and telecommunications service system, part 1

    NASA Technical Reports Server (NTRS)

    1972-01-01

    Major study areas treated in this volume are: 1) operations and control and 2) the telecommunication service system. The TDRS orbit selection, orbital deployment, ground station visibility, sequence of events from launch to final orbit position, and TDRS control center functions required for stationkeeping, repositioning, attitude control, and antenna pointing are briefly treated as part of the operations and control section. The last topic of this section concerns the operations required for efficiently providing the TDRSS user telecommunication services. The discussion treats functions of the GSFC control and data processing facility, ground station, and TDRS control center. The second major portion of this volume deals with the Telecommunication Service System (TSS) which consists of the ground station, TDRS communication equipment and the user transceiver. A summary of the requirements and objectives for the telecommunication services and a brief summary of the TSS capabilities is followed by communication system analysis, signal design, and equipment design. Finally, descriptions of the three TSS elements are presented.

  9. Precise Orbit Determination of BeiDou Navigation Satellite System

    NASA Astrophysics Data System (ADS)

    He, Lina; Ge, Maorong; Wang, Jiexian; Wickert, Jens; Schuh, Harald

    2013-04-01

    China has been developing its own independent satellite navigation system since decades. Now the COMPASS system, also known as BeiDou, is emerging and gaining more and more interest and attention in the worldwide GNSS communities. The current regional BeiDou system is ready for its operational service around the end of 2012 with a constellation including five Geostationary Earth Orbit satellites (GEO), five Inclined Geosynchronous Orbit satellites (IGSO) and four Medium Earth orbit (MEO) satellites in operation. Besides the open service with positioning accuracy of around 10m which is free to civilian users, both precise relative positioning, and precise point positioning are demonstrated as well. In order to enhance the BeiDou precise positioning service, Precise Orbit Determination (POD) which is essential of any satellite navigation system has been investigated and studied thoroughly. To further improving the orbits of different types of satellites, we study the impact of network coverage on POD data products by comparing results from tracking networks over the Chinese territory, Asian-Pacific, Asian and of global scale. Furthermore, we concentrate on the improvement of involving MEOs on the orbit quality of GEOs and IGSOs. POD with and without MEOs are undertaken and results are analyzed. Finally, integer ambiguity resolution which brings highly improvement on orbits and positions with GPS data is also carried out and its effect on POD data products is assessed and discussed in detail. Seven weeks of BeiDou data from a ground tracking network, deployed by Wuhan University is employed in this study. The test constellation includes four GEO, five IGSO and two MEO satellites in operation. The three-day solution approach is employed to enhance its strength due to the limited coverage of the tracking network and the small movement of most of the satellites. A number of tracking scenarios and processing schemas are identified and processed and overlapping orbit differences are utilized to qualify the estimated orbits and clocks. The results show that GEO orbits, especially the along-track component, can be significantly improved by extending the tracking network in China along longitude direction, whereas IGSOs gain more improvement if the tracking network extends in latitude. For the current tracking network, deploying tracking stations on the eastern side, for example in New Zealand and/or in Hawaii, will significantly reduce along-track biases of GEOs on the same side. The involvement of MEOs and ambiguity-fixing also make the orbits better but rather moderate. Key words: BeiDou, precise orbit determination (POD), tracking network, ambiguity-fixing

  10. Feasibility and tradeoff study of an aeromaneuvering orbit-to-orbit shuttle (AMOOS)

    NASA Technical Reports Server (NTRS)

    White, J.

    1974-01-01

    This study establishes that configurations satisfying the aeromaneuvering orbit-to-orbit shuttle (AMOOS) requirements can be designed with performance capabilities in excess of the purely propulsive space tug. In view of this improved potential of the AMOOS vehicle over the propulsive space tug concept it is recommended that the AMOOS studies be advanced to a stage comparable to those performed for the space tug. This advancement is needed in particular in areas that are either peculiar to AMOOS or not addressed in sufficient detail in these studies to date. These areas include the thermodynamics problems, navigation and guidance, operations and economics analyses, subsystems and interfaces. The aeromaneuvering orbit-to-orbit shuttle (AMOOS) is evaluated as a candidate reusable third stage to the two-stage earth-to-orbit shuttle (EOS). AMOOS has the potential for increased payload capability over the purely propulsive space tug by trading a savings in consumables for an increase in structural and thermal protection system (TPS) mass.

  11. Manual control aspects of orbital flight

    NASA Technical Reports Server (NTRS)

    Brody, Adam R.

    1990-01-01

    Studies of spacecraft rendezvous and docking operations began in the Gemini program in preparation for the two dockings required to send a crew to the moon and return them safely to Earth. However, the goal of getting to the moon before the end of the decade was of greater concern than mission optimization so little or no time or money was expended in researching human factors implications of operational aspects such as braking gates or control modes. Also, with sixteen operational dockings over a six year period (12 Apollo, 3 Skylab, and 1 ASTP) in the United States space program, economies of scale were not yet available to justify extensive research into decreasing the time or fuel necessary for a successful docking. With an operational space station era approaching in which orbital maneuvering vehicle (OMV), orbital transfer vehicle (OTV), shuttle orbiter, and other traffic will play a major role, a concerted research effort now could help avoid many potential problems later in addition to increasing safety, fuel economy, and productivity. A knowledge of manual control capabilities associated with piloted spaceflight could help save a life if the operational flight envelope can be safely enlarged to include faster dockings that currently envisioned. For example, current and future research is designed to acquire the appropriate information.

  12. Robotic space simulation integration of vision algorithms into an orbital operations simulation

    NASA Technical Reports Server (NTRS)

    Bochsler, Daniel C.

    1987-01-01

    In order to successfully plan and analyze future space activities, computer-based simulations of activities in low earth orbit will be required to model and integrate vision and robotic operations with vehicle dynamics and proximity operations procedures. The orbital operations simulation (OOS) is configured and enhanced as a testbed for robotic space operations. Vision integration algorithms are being developed in three areas: preprocessing, recognition, and attitude/attitude rates. The vision program (Rice University) was modified for use in the OOS. Systems integration testing is now in progress.

  13. Space nuclear power applied to electric propulsion

    NASA Technical Reports Server (NTRS)

    Vicente, F. A.; Karras, T.; Darooka, D.; Isenberg, L.

    1989-01-01

    Space reactor power systems with characteristics ideal for advanced spacecraft systems applications are discussed. These characteristics are: high power-to-weight ratio (15 to 33 W/kg); high volume density (high ballistic coefficient); no preferential orientation in orbit; long operational life; high reliability; and total launch and operational safety. These characteristics allow the use of electric propulsion to raise spacecraft from low earth parking orbits to operational orbits, greatly increasing the useful orbit payload for a given launch vehicle by eliminating the need for a separation injection stage. A proposed demonstration mission is described.

  14. Performance of a Brayton power system with a space type radiator

    NASA Technical Reports Server (NTRS)

    Nussle, R. C.; Prok, G. M.; Fenn, D. B.

    1974-01-01

    Test results of an experimental investigation to measure Brayton engine performance while operating at the sink temperatures of a typical low earth orbit are presented. The results indicate that the radiator area was slightly oversized. The steady state and transient responses of the power system to the sink temperatures in orbit were measured. During the orbital operation, the engine did not reach the steady state operation of either sun or shade conditions. The alternator power variation during orbit was + or - 4 percent from its mean value of 9.3 kilowatts.

  15. Development and verification of ground-based tele-robotics operations concept for Dextre

    NASA Astrophysics Data System (ADS)

    Aziz, Sarmad

    2013-05-01

    The Special Purpose Dextreous Manipulator (Dextre) is the latest addition to the on-orbit segment of the Mobile Servicing System (MSS); Canada's contribution to the International Space Station (ISS). Launched in March 2008, the advanced two-armed robot is designed to perform various ISS maintenance tasks on robotically compatible elements and on-orbit replaceable units using a wide variety of tools and interfaces. The addition of Dextre has increased the capabilities of the MSS, and has introduced significant complexity to ISS robotics operations. While the initial operations concept for Dextre was based on human-in-the-loop control by the on-orbit astronauts, the complexities of robotic maintenance and the associated costs of training and maintaining the operator skills required for Dextre operations demanded a reexamination of the old concepts. A new approach to ISS robotic maintenance was developed in order to utilize the capabilities of Dextre safely and efficiently, while at the same time reducing the costs of on-orbit operations. This paper will describe the development, validation, and on-orbit demonstration of the operations concept for ground-based tele-robotics control of Dextre. It will describe the evolution of the new concepts from the experience gained from the development and implementation of the ground control capability for the Space Station Remote Manipulator System; Canadarm 2. It will discuss the various technical challenges faced during the development effort, such as requirements for high positioning accuracy, force/moment sensing and accommodation, failure tolerance, complex tool operations, and the novel operational tools and techniques developed to overcome them. The paper will also describe the work performed to validate the new concepts on orbit and will discuss the results and lessons learned from the on-orbit checkout and commissioning of Dextre using the newly developed tele-robotics techniques and capabilities.

  16. Interactive orbital proximity operations planning system

    NASA Technical Reports Server (NTRS)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1988-01-01

    An interactive graphical proximity operations planning system was developed, which allows on-site design of efficient, complex, multiburn maneuvers in a dynamic multispacecraft environment. Maneuvering takes place in and out of the orbital plane. The difficulty in planning such missions results from the unusual and counterintuitive character of orbital dynamics and complex time-varying operational constraints. This difficulty is greatly overcome by visualizing the relative trajectories and the relevant constraints in an easily interpretable graphical format, which provides the operator with immediate feedback on design actions. The display shows a perspective bird's-eye view of a Space Station and co-orbiting spacecraft on the background of the Station's orbital plane. The operator has control over the two modes of operation: a viewing system mode, which enables the exporation of the spatial situation about the Space Station and thus the ability to choose and zoom in on areas of interest; and a trajectory design mode, which allows the interactive editing of a series of way points and maneuvering burns to obtain a trajectory that complies with all operational constraints. A first version of this display was completed. An experimental program is planned in which operators will carry out a series of design missions which vary in complexity and constraints.

  17. Orbiting propellent depot safety. Volume 2: Technical discussion

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The results of a study assessing the gross requirements and concomitant safety hazards associated with the operation of several configurations of orbiting propellant depots (OPD) are presented. The major structural and operational aspects of the integral, semimodular, and modular concepts are described. The concepts are evaluated to determine their safety hazards, and emphasis is placed on propellant transfer to and from the OPD. The study indicates that a modular mode of depot resupply is desirable regardless of the OPD configuration. This resupply mode requires no flow transfer to resupply either the semimodular or modular OPD. Of the three concepts, the semimodular appears to provide the best operational advantage and lowest safety risk.

  18. Skylab reuse study, reference data, part 1. [habitability of the orbital workshop and airlock modules for the space transportation system

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The accommodations provided by the airlock module and the orbital workshop were completely examined with the thought of total reactivation as an enhancement to the STS long duration missions. Each subsystem is described and a summary of subsystem performance during the Skylab missions is presented. End-of-mission status and the status of today for each subsystem is shown together with refurbishment/resupply requirements and refurb kit descriptions to restore Skylab to full operational capability. An inspection/refurbishment and operations plan for Skylab is included. The initial Shuttle-tended operational activity would provide a safe, effective phase of Skylab rehabilitation while simultaneously benefitting the Orbiter crew through the addition of private accommodations, off-duty recreation area, and physical conditioning equipment. This period would also permit exercising selected onboard experiments.

  19. A feasibility study of orbiter flight control experiments

    NASA Technical Reports Server (NTRS)

    Geissler, W. H.

    1978-01-01

    The results of a feasibility study of orbiter flight control experiments performed are summarized. Feasibility studies were performed on a group of 14 experiments selected from a candidate list of 35 submitted to the study contractor by the flight control community. Concepts and requirements were developed for the 14 selected experiments and they were ranked on a basis of technical value, feasibility, and cost. It was concluded that all the selected experiments can be considered as potential candidates for the Orbiter Experiment program, which is being formulated for the Orbiter Flight Tests and subsequent operational flights, regardless of the relative ranking established during the study. None of the selected experiments has significant safety implications and the cost of most was estimated to be less than $200K.

  20. Magnetic attitude control torque generation of a gravity gradient stabilized satellite

    NASA Astrophysics Data System (ADS)

    Suhadis, N. M.; Salleh, M. B.; Rajendran, P.

    2018-05-01

    Magnetic torquer is used to generate a magnetic dipole moment onboard satellites whereby a control torque for attitude control purposes is generated when it couples with the geomagnetic field. This technique has been considered very attractive for satellites operated in Low Earth Orbit (LEO) as the strength of the geomagnetic field is relatively high below the altitude of 1000 km. This paper presents the algorithm used to generate required magnetic dipole moment by 3 magnetic torquers mounted onboard a gravity gradient stabilized satellite operated at an altitude of 540 km with nadir pointing mission. As the geomagnetic field cannot be altered and its magnitude and direction vary with respect to the orbit altitude and inclination, a comparison study of attitude control torque generation performance with various orbit inclination is performed where the structured control algorithm is simulated for 13°, 33° and 53° orbit inclinations to see how the variation of the satellite orbit affects the satellite's attitude control torque generation. Results from simulation show that the higher orbit inclination generates optimum magnetic attitude control torque for accurate nadir pointing mission.

  1. SRMS Assisted Docking and Undocking for the Orbiter Repair Maneuver

    NASA Technical Reports Server (NTRS)

    Quiocho, Leslie J.; Briscoe, Timothy J.; Schliesing, John A.; Braman, Julia M.

    2005-01-01

    As part of the Orbiter Repair Maneuver (ORM) planned for Return to Flight (RTF) operations, the Shuttle Remote Manipulator System (SRMS) must undock the Orbiter, maneuver it through a complex trajectory at extremely low rates, present it to an EVA crewman at the end of the Space Station Remote Manipulator System to perform the Thermal Protection System (TPS) repair, and then retrace back through the trajectory to dock the Orbiter with the Orbiter Docking System (ODs). The initial and final segments of this operation involve the interaction between the SRMS, ISS, Orbiter and ODs. This paper first provides an overview of the Monte-Carlo screening analysis for the installation (both nominal and contingency), including the variation of separation distance, misalignment conditions, SRMS joint/brake parameter characteristics, and PRCS jet combinations and corresponding thrust durations. The resulting 'optimum' solution is presented based on trade studies between predicted capture success and integrated system loads. This paper then discusses the upgrades to the APAS math model associated with the new SRMS assisted undocking technique and reviews simulation results for various options investigated for either the active and passive separation of the ISS from the Orbiter.

  2. Orbit transfer rocket engine technology program. Phase 2: Advanced engine study

    NASA Technical Reports Server (NTRS)

    Erickson, C.; Martinez, A.; Hines, B.

    1987-01-01

    In Phase 2 of the Advanced Engine Study, the Failure Modes and Effects Analysis (FMEA) maintenance-driven engine design, preliminary maintenance plan, and concept for space operable disconnects generated in Phase 1 were further developed. Based on the results of the vehicle contractors Orbit Transfer Vehicle (OTV) Concept Definition and System Analysis Phase A studies, minor revisions to the engine design were made. Additional refinements in the engine design were identified through further engine concept studies. These included an updated engine balance incorporating experimental heat transfer data from the Enhanced Heat Load Thrust Chamber Study and a Rao optimum nozzle contour. The preliminary maintenance plan of Phase 1 was further developed through additional studies. These included a compilation of critical component lives and life limiters and a review of the Space Shuttle Main Engine (SSME) operations and maintenance manual in order to begin outlining the overall maintenance procedures for the Orbit Transfer Vehicle Engine and identifying technology requirements for streamlining space-based operations. Phase 2 efforts also provided further definition to the advanced fluid coupling devices including the selection and preliminary design of a preferred concept and a preliminary test plan for its further development.

  3. Status of the French Mars Exploration Program

    NASA Astrophysics Data System (ADS)

    Bonneville, R.; Counil, J.-L.; Rocard, F.

    2002-01-01

    The French Mars exploration initiative named PREMIER (Programme de Retour d'Echantillons Martiens et Installation d'Expériences en Réseau) is a long term, multiform co- operative program including as its two main components : - the development with a consortium of European partners (Finland, Germany, Belgium) and the deployment of a network of 4 small Mars ground stations for performing geophysical measurements (NetLander project) ; - a participation to the future Mars Sample Return mission (MSR) in cooperation with NASA including the development and the operation of the orbiter vehicle of this mission. Its additional elements are : - instrument contributions to ESA's Mars Express mission ; - payload contributions to the orbiters and landers &rovers of the future missions to Mars, and especially to NASA's "smart lander" mission dedicated to in situ investigations. This program wants to ensure the complementarity between its three poles : (i) global investigations from the orbit, (ii) landed science with both network science (NetLanders) and in situ investigations, and (iii) sample return. A major step in the PREMIER program will be the 2007 orbiter mission ; this precursor vehicle developed by CNES and launched by Ariane 5 in September 2007 will first deliver the 4 NetLanders at Mars and then will be inserted in Mars orbit. This orbiter will perform technological tests aiming at preparing the future Mars Sample Return mission, it will ensure a telecommunication relay function for the NetLanders and it will be used for an additional orbital science mission. While the NetLanders will study the internal structure of Mars and its climate, with the goal to operate a full Martian year, the primary objectives of the orbital science mission will be complementary of those of the NetLanders, with an emphasis on the study of the Martian atmosphere. In a first phase, the orbiter will be on a 500 km x 500 km circular, near polar, Sun-synchronous orbit around 12 am local time, which is optimal for the NetLander relay. In a second phase, the orbit will be lowered around 350 km for the benefit of the orbital science. A very low periapsis phase (170 km x 1000 km) is foreseen for some experiments. The nominal mission will end in September 2011, with the hope of an extended mission beyond this date.

  4. Servicing communication satellites in geostationary orbit

    NASA Technical Reports Server (NTRS)

    Russell, Paul K.; Price, Kent M.

    1990-01-01

    The econmic benefits of a LEO space station are quantified by identifying alternative operating scenarios utilizing the space station's transportation facilities and assembly and repair facilities. Particular consideration is given to the analysis of the impact of on-orbit assembly and servicing on a typical communications satellite is analyzed. The results of this study show that on-orbit servicing can increase the internal rate of return by as much as 30 percent.

  5. Space operations center: Shuttle interaction study extension, executive summary

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The Space Operations Center (SOC) is conceived as a permanent facility in low Earth orbit incorporating capabilities for space systems construction; space vehicle assembly, launching, recovery and servicing; and the servicing of co-orbiting satellites. The Shuttle Transportation System is an integral element of the SOC concept. It will transport the various elements of the SOC into space and support the assembly operation. Subsequently, it will regularly service the SOC with crew rotations, crew supplies, construction materials, construction equipment and components, space vehicle elements, and propellants and spare parts. The implications to the SOC as a consequence of the Shuttle supporting operations are analyzed. Programmatic influences associated with propellant deliveries, spacecraft servicing, and total shuttle flight operations are addressed.

  6. OAO-C Copernicus Operations Report

    NASA Technical Reports Server (NTRS)

    1981-01-01

    An analysis of the operation of OAO 3, Copernicus, the orbiting astronomical observatory, is given with particular emphasis upon the Princeton Experiment Package. Malfunctions and their impact are discussed, as are orbital observations and operations. Software is described.

  7. Preparing GMAT for Operational Maneuver Planning of the Advanced Composition Explorer (ACE)

    NASA Technical Reports Server (NTRS)

    Qureshi, Rizwan Hamid; Hughes, Steven P.

    2014-01-01

    The General Mission Analysis Tool (GMAT) is an open-source space mission design, analysis and trajectory optimization tool. GMAT is developed by a team of NASA, private industry, public and private contributors. GMAT is designed to model, optimize and estimate spacecraft trajectories in flight regimes ranging from low Earth orbit to lunar applications, interplanetary trajectories and other deep space missions. GMAT has also been flight qualified to support operational maneuver planning for the Advanced Composition Explorer (ACE) mission. ACE was launched in August, 1997 and is orbiting the Sun-Earth L1 libration point. The primary science objective of ACE is to study the composition of both the solar wind and the galactic cosmic rays. Operational orbit determination, maneuver operations and product generation for ACE are conducted by NASA Goddard Space Flight Center (GSFC) Flight Dynamics Facility (FDF). This paper discusses the entire engineering lifecycle and major operational certification milestones that GMAT successfully completed to obtain operational certification for the ACE mission. Operational certification milestones such as gathering of the requirements for ACE operational maneuver planning, gap analysis, test plans and procedures development, system design, pre-shadow operations, training to FDF ACE maneuver planners, shadow operations, Test Readiness Review (TRR) and finally Operational Readiness Review (ORR) are discussed. These efforts have demonstrated that GMAT is flight quality software ready to support ACE mission operations in the FDF.

  8. A General Approach to the Geostationary Transfer Orbit Mission Recovery

    NASA Technical Reports Server (NTRS)

    Faber, Nicolas; Aresini, Andrea; Wauthier, Pascal; Francken, Philippe

    2007-01-01

    This paper discusses recovery scenarios for geosynchronous satellites injected in a non-nominal orbit due to a launcher underperformance. The theory on minimum-fuel orbital transfers is applied to develop an operational tool capable to design a recovery mission. To obtain promising initial guesses for the recovery three complementary techniques are used: p-optimized impulse function contouring, a numerical impulse function minimization and the solutions to the switching equations. The tool evaluates the feasibility of a recovery with the on-board propellant of the spacecraft and performs the complete mission design. This design takes into account for various mission operational constraints such as e.g., the requirement of multiple finite-duration burns, third-body orbital perturbations, spacecraft attitude constraints and ground station visibility. In a final case study, we analyze the consequences of a premature breakdown of an upper rocket stage engine during injection on a geostationary transfer orbit, as well as the possible recovery solution with the satellite on-board propellant.

  9. Mission Analysis Program for Solar Electric Propulsion (MAPSEP). Volume 1: Analytical manual for earth orbital MAPSEP

    NASA Technical Reports Server (NTRS)

    1975-01-01

    An introduction to the MAPSEP organization and a detailed analytical description of all models and algorithms are given. These include trajectory and error covariance propagation methods, orbit determination processes, thrust modeling, and trajectory correction (guidance) schemes. Earth orbital MAPSEP contains the capability of analyzing almost any currently projected low thrust mission from low earth orbit to super synchronous altitudes. Furthermore, MAPSEP is sufficiently flexible to incorporate extended dynamic models, alternate mission strategies, and almost any other system requirement imposed by the user. As in the interplanetary version, earth orbital MAPSEP represents a trade-off between precision modeling and computational speed consistent with defining necessary system requirements. It can be used in feasibility studies as well as in flight operational support. Pertinent operational constraints are available both implicitly and explicitly. However, the reader should be warned that because of program complexity, MAPSEP is only as good as the user and will quickly succumb to faulty user inputs.

  10. Preliminary Analysis of Ground-based Orbit Determination Accuracy for the Wide Field Infrared Survey Telescope (WFIRST)

    NASA Technical Reports Server (NTRS)

    Sease, Brad

    2017-01-01

    The Wide Field Infrared Survey Telescope is a 2.4-meter telescope planned for launch to the Sun-Earth L2 point in 2026. This paper details a preliminary study of the achievable accuracy for WFIRST from ground-based orbit determination routines. The analysis here is divided into two segments. First, a linear covariance analysis of early mission and routine operations provides an estimate of the tracking schedule required to meet mission requirements. Second, a simulated operations scenario gives insight into the expected behavior of a daily Extended Kalman Filter orbit estimate over the first mission year given a variety of potential momentum unloading schemes.

  11. Preliminary Analysis of Ground-Based Orbit Determination Accuracy for the Wide Field Infrared Survey Telescope (WFIRST)

    NASA Technical Reports Server (NTRS)

    Sease, Bradley; Myers, Jessica; Lorah, John; Webster, Cassandra

    2017-01-01

    The Wide Field Infrared Survey Telescope is a 2.4-meter telescope planned for launch to the Sun-Earth L2 point in 2026. This paper details a preliminary study of the achievable accuracy for WFIRST from ground-based orbit determination routines. The analysis here is divided into two segments. First, a linear covariance analysis of early mission and routine operations provides an estimate of the tracking schedule required to meet mission requirements. Second, a simulated operations'' scenario gives insight into the expected behavior of a daily Extended Kalman Filter orbit estimate over the first mission year given a variety of potential momentum unloading schemes.

  12. Impingement effect of service module reaction control system engine plumes. Results of service module reaction control system plume model force field application to an inflight Skylab mission proximity operation situation with the inflight Skylab response

    NASA Technical Reports Server (NTRS)

    Lobb, J. D., Jr.

    1978-01-01

    Plume impingement effects of the service module reaction control system thruster firings were studied to determine if previous flight experience would support the current plume impingement model for the orbiter reaction control system engines. The orbiter reaction control system is used for rotational and translational maneuvers such as those required during rendezvous, braking, docking, and station keeping. Therefore, an understanding of the characteristics and effects of the plume force fields generated by the reaction control system thruster firings were examined to develop the procedures for orbiter/payload proximity operations.

  13. 47 CFR 25.283 - End-of-life disposal.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Technical Operations § 25.283 End-of-life disposal. (a) Geostationary orbit space stations. Unless otherwise explicitly specified in an authorization, a space station authorized to operate in the geostationary... operate in the geostationary satellite orbit under this part may operate using its authorized tracking...

  14. 47 CFR 25.283 - End-of-life disposal.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Technical Operations § 25.283 End-of-life disposal. (a) Geostationary orbit space stations. Unless otherwise explicitly specified in an authorization, a space station authorized to operate in the geostationary... operate in the geostationary satellite orbit under this part may operate using its authorized tracking...

  15. 47 CFR 25.283 - End-of-life disposal.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Technical Operations § 25.283 End-of-life disposal. (a) Geostationary orbit space stations. Unless otherwise explicitly specified in an authorization, a space station authorized to operate in the geostationary... operate in the geostationary satellite orbit under this part may operate using its authorized tracking...

  16. Test effectiveness study report: An analytical study of system test effectiveness and reliability growth of three commercial spacecraft programs

    NASA Technical Reports Server (NTRS)

    Feldstein, J. F.

    1977-01-01

    Failure data from 16 commercial spacecraft were analyzed to evaluate failure trends, reliability growth, and effectiveness of tests. It was shown that the test programs were highly effective in ensuring a high level of in-orbit reliability. There was only a single catastrophic problem in 44 years of in-orbit operation on 12 spacecraft. The results also indicate that in-orbit failure rates are highly correlated with unit and systems test failure rates. The data suggest that test effectiveness estimates can be used to guide the content of a test program to ensure that in-orbit reliability goals are achieved.

  17. Glenn Goddard TDRSS Waveform 1.1.3 On-Orbit Performance Report

    NASA Technical Reports Server (NTRS)

    Chelmins, David T.

    2014-01-01

    The objective of the Space Communications and Navigation (SCaN) Testbed is to study the development, testing, and operation of software defined radios (SDRs) and their associated appliations in the operational space environment to reduce cost and risk for future space missions. This report covers the results of on-orbit performance testing completed using the Glenn Goddard Tracking and Data Relay Satellite System (TDRSS) waveform version 1.1.3 in the ground and space environments. The Glenn Goddard TDRSS (GGT) waveform, operating on the SCaN Testbed Jet Propulsion Laboratory (JPL) SDR, is capable of a variety of data rates and frequencies, operating using Binary Phase Shift Keying (BPSK).

  18. Complications and outcomes of grafting of posterior orbital fat into the lower lid-cheek junction during orbital decompression.

    PubMed

    Litwin, Andre S; Poitelea, Cornelia; Tan, Petrina; Ziahosseini, Kimia; Malhotra, Raman

    2018-04-01

    To report the complications of grafting of excised posterior orbital fat into the lower lid-cheek junction at the time of orbital decompression surgery. Retrospective review of consecutive patients undergoing orbital decompression combined with grafting of posterior orbital fat to the pre-malar and lateral canthal area (FG). A second group of consecutive patients undergoing orbital decompression but no orbital fat grafting (NoFG) were also studied as a form of comparative control. Standard patient data, including age, sex, visual acuity, degree of proptosis, operative details, diplopia or any other complications was collected. Independent assessment of pre- and post-operative photographs graded the lower lid-cheek junction. Thirty-four orbits of 29 patients, of which 21 orbits underwent orbital decompression with orbital fat grafting (FG). There were no intraoperative complications, postoperative infections, or visual loss. Complications relating to fat grafting included prolonged swelling in 3 (17%) patients at 3 months, in 1 case lasting 6 months, lower lid lumps in 3 (17%), and fat seepage in 1 (6%). The FG group achieved a greater improvement in the appearance of the lower-lid-cheek junction at 12 months in comparison to NoFG. Mean grade improvement 1.24 ± 1.09 vs 0 ± 0.82 (p = 0.025). Median follow-up was 20 months (range 6-30 months). Grafting of excised orbital fat during orbital decompression can improve the appearance of the lower lid-cheek junction in patients being treated for thyroid orbitopathy. However, 24% of patients will experience swelling and/or lumpiness requiring several months to settle or further fat excision.

  19. NanoSat Constellation Mission Design

    NASA Technical Reports Server (NTRS)

    Concha, Marco; DeFazio, Robert

    1998-01-01

    The NanoSat constellation concept mission proposes simultaneous operation of multiple swarms of as many as 22 identical 10 kg spacecraft per swarm. The various orbits in a NanoSat swarm vary from 3x12 to 3x42 R(sub e) in geometry. In this report the unique flight dynamics issues of this constellation satellite mission design are addressed. Studies include orbit design, orbit determination, and error analysis. A preliminary survey determined the orbital parameters that would limit the maximum shadow condition while providing adequate ground station access for three ground stations.

  20. In-Orbit Operation of the ASTRO-H SXS

    NASA Technical Reports Server (NTRS)

    Tsujimoto, Masahiro; Mitsuda, Kazuhisa; Kelley, Richard L.; den Herder, Jan-Willem A.; Akamatsu, Hiroki; Bialas, Thomas G.; Boyce, Kevin R.; Brown, Gregory V.; Chiao, Meng P.; Costantini, Elisa; hide

    2016-01-01

    We summarize all of the in-orbit operations of the soft x-ray spectrometer (SXS) onboard the ASTROH (Hitomi) satellite. The satellite was launched on February 17, 2016, and the communication with the satellite ceased on March 26, 2016. The SXS was still in the commissioning phase, in which the set-ups were progressively changed. This paper is intended to serve as a concise reference of the events in orbit in order to properly interpret the SXS data taken during its short lifetime and as a test case for planning the in-orbit operation for future microcalorimeter missions.

  1. In-Orbit Operation of the ASTRO-H SXS

    NASA Technical Reports Server (NTRS)

    Tsujimoto, Masahiro; Mitsuda, Kazuhisa; Kelley, Richard L.; den Herder, Jan-Willem A.; Akamatsu, Hiroki; Bialas, Thomas G.; Boyce, Kevin R.; Brown, Gregory V.; Chiao, Meng P.; Costantini, Elisa; hide

    2016-01-01

    We summarize all the in-orbit operations of the Soft X-ray Spectrometer (SXS) onboard the ASTRO-H (Hitomi) satellite. The satellite was launched on 2016-02- 17 and the communication with the satellite ceased on2016-03-26. The SXS was still in the commissioning phase, in which the setups were progressively changed. This article is intended to serve as a reference of the events in the orbit to properly interpret the SXS data taken during its short life time, and as a test case for planning the in-orbit operation for future micro-calorimeter missions.

  2. In-orbit operation of the ASTRO-H SXS

    NASA Astrophysics Data System (ADS)

    Tsujimoto, Masahiro; Mitsuda, Kazuhisa; Kelley, Richard L.; den Herder, Jan-Willem A.; Akamatsu, Hiroki; Bialas, Thomas G.; Boyce, Kevin R.; Brown, Gregory V.; Chiao, Meng P.; Costantini, Elisa; de Vries, Cor P.; DiPirro, Michael J.; Eckart, Megan E.; Ezoe, Yuichiro; Fujimoto, Ryuichi; Haas, Daniel; Hoshino, Akio; Ishikawa, Kumi; Ishisaki, Yoshitaka; Iyomoto, Naoko; Kilbourne, Caroline A.; Kitamoto, Shunji; Koyama, Shu; Leutenegger, Maurice A.; McCammon, Dan; Mitsuishi, Ikuyuki; Murakami, Hiroshi; Murakami, Masahide; Noda, Hirofumi; Ogawa, Mina; Ota, Naomi; Paltani, Stéphane; Porter, Frederick S.; Sato, Kosuke; Sato, Yoichi; Sawada, Makoto; Seta, Hiromi; Shinozaki, Keisuke; Shirron, Peter J.; Sneiderman, Gary A.; Sugita, Hiroyuki; Szymkowiak, Andrew E.; Takei, Yoh; Tamagawa, Toru; Tashiro, Makoto S.; Terada, Yukikatsu; Yamada, Shinya; Yamasaki, Noriko Y.; Yatsu, Yoichi

    2016-07-01

    We summarize all the in-orbit operations of the Soft X-ray Spectrometer (SXS) onboard the ASTRO-H (Hit- omi) satellite. The satellite was launched on 2016/02/17 and the communication with the satellite ceased on 2016/03/26. The SXS was still in the commissioning phase, in which the setups were progressively changed. This article is intended to serve as a reference of the events in the orbit to properly interpret the SXS data taken during its short life time, and as a test case for planning the in-orbit operation for future micro-calorimeter missions.

  3. Low energy stage study. Volume 3: Conceptual design, interface analysis, flight and ground operations. [launching space shuttle payloads

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Low energy conceptual stage designs and adaptations to existing/planned shuttle upper stages were developed and their performance established. Selected propulsion modes and subsystems were used as a basis to develop airborne support equipment (ASE) design concepts. Orbiter installation and integration (both physical and electrical interfaces) were defined. Low energy stages were adapted to the orbiter and ASE interfaces. Selected low energy stages were then used to define and describe typical ground and flight operations.

  4. Space shuttle orbit maneuvering engine reusable thrust chamber: Adverse operating conditions test report

    NASA Technical Reports Server (NTRS)

    Tobin, R. D.

    1974-01-01

    Test hardware, facilities, and procedures are described along with results of electrically heated tube and channel tests conducted to determine adverse operating condition limits for convectively cooled chambers typical of Space Shuttle Orbit Manuevering Engine designs. Hot-start tests were conducted with corrosion resistant steel and nickel tubes with both monomethylhydrazine and 50-50 coolants. Helium ingestion, in both bubble and froth form, was studied in tubular test sections. Helium bubble ingestion and burn-out limits in rectangular channels were also investigated.

  5. Mars geoscience/climatology orbiter low cost mission operations

    NASA Technical Reports Server (NTRS)

    Erickson, K. D.

    1984-01-01

    It will not be possible to support the multiple planetary missions of the magnitude and order of previous missions on the basis of foreseeable NASA funding. It is, therefore, necessary to seek innovative means for accomplishing the goals of planetary exploration with modestly allocated resources. In this connection, a Core Program set of planetary exploration missions has been recommended. Attention is given to a Mission Operations design overview which is based on the Mars Geoscience/Climatology Orbiter Phase-A study performed during spring of 1983.

  6. EVA-SCRAM operations

    NASA Technical Reports Server (NTRS)

    Flanigan, Lee A.; Tamir, David; Weeks, Jack L.; Mcclure, Sidney R.; Kimbrough, Andrew G.

    1994-01-01

    This paper wrestles with the on-orbit operational challenges introduced by the proposed Space Construction, Repair, and Maintenance (SCRAM) tool kit for Extra-Vehicular Activity (EVA). SCRAM undertakes a new challenging series of on-orbit tasks in support of the near-term Hubble Space Telescope, Extended Duration Orbiter, Long Duration Orbiter, Space Station Freedom, other orbital platforms, and even the future manned Lunar/Mars missions. These new EVA tasks involve welding, brazing, cutting, coating, heat-treating, and cleaning operations. Anticipated near-term EVA-SCRAM applications include construction of fluid lines and structural members, repair of punctures by orbital debris, refurbishment of surfaces eroded by atomic oxygen, and cleaning of optical, solar panel, and high emissivity radiator surfaces which have been degraded by contaminants. Future EVA-SCRAM applications are also examined, involving mass production tasks automated with robotics and artificial intelligence, for construction of large truss, aerobrake, and reactor shadow shield structures. Realistically achieving EVA-SCRAM is examined by addressing manual, teleoperated, semi-automated, and fully-automated operation modes. The operational challenges posed by EVA-SCRAM tasks are reviewed with respect to capabilities of existing and upcoming EVA systems, such as the Extravehicular Mobility Unit, the Shuttle Remote Manipulating System, the Dexterous End Effector, and the Servicing Aid Tool.

  7. ROGER a potential orbital space debris removal system

    NASA Astrophysics Data System (ADS)

    Starke, Juergen; Bischof, Bernd; Foth, W.-O.; -J., J.; Günther

    The previous activities in the field of On Orbit Servicing studied in the 1990's included in partic-ular the capability of vehicles in GEO to capture and support satellites (mainly communication satellites) to enable repair and continuation of operations, and finally the controlled transfer the target into a permanent graveyard orbit. The specific capture tools for these applications were mostly based on robotic systems to capture and fix the target under specific dynamic constraints (e.g. slowly tumbling target) without damage, and to allow the stabilization, re-orientation and potential repair of the target and subsequent release or transport to the final disposal orbit. Due to the drastically increasing number of debris particularly in the Low Earth Orbits (SSO) the active debris removal is now necessary to counteract to the predicted debris production cascade (Kessler Syndrome), which means the pollution of the total sphere in low earth orbit and not only the SSO area. In most of the debris congresses it was recommended to start removal with the still integrated systems as soon as possible. In the case of large debris objects, the soft capture system can be replaced by a simpler and robust system able to operate from a safe distance to the target and flexible enough to capture and hold different types of targets such as deactivated and/or defective satellites, upper stages and big fragments. These nominally non -cooperative targets might be partially destroyed by the capture process, but the production of additional debris shall be avoided. A major argument for the commercial applications is a multi-target mission potential, which is possible at GEO because the transfer propellant requirement to the disposal orbit and the return to the orbit of the next potential target is relative low (orbits with similar inclination and altitude). The proposed ROGER system is designed as a spacecraft with rendezvous capabilities including inspection in the vicinity of the target and stabilization and transportation features for the combined configuration. The capture system is a deployable and closable net. The net is ejected from the mother spacecraft at a safe distance to prevent any collision with the target. After transport to the disposal orbit the net will be cut and the spacecraft will return to the operational orbit of the next target. An initial down-scaled demonstration is planned for the net capture system on a parabolic flight in autumn 2010. Further representative demonstrations including, for example, one in LEO are under discussion. The capture system can be used operationally also in other orbits e.g. LEO, but the propellant requirements for transport of the target into a direct controlled re-entry orbit and the subsequent return of the mother spacecraft to a new target orbit will be very high. This could impact the multi mission capability of the system. The potential applications are under discussion with different customers including satellite operators, insurance companies and international organisations. juergen.starke@astrium.eads.net Tel.: +49-421-539-4573

  8. Cryogenic Orbital Nitrogen Experiment (CONE): Phase A/B design study

    NASA Technical Reports Server (NTRS)

    Bailey, William J.; Weiner, Stephen P.; Beekman, Douglas H.

    1991-01-01

    Subcritical cryogenic fluid management (CFM) has long been recognized as an enabling technology for future space missions. Subcritical liquid storage and supply are two of the five CFM technology areas that need to be studied in the low gravity on-orbit environment. The Cryogenic Orbital Nitrogen Experiment (CONE) is a LN2 cryogenic storage and supply system demonstration placed in orbit by the National Space Transportation System (NSTS) Orbiter and operated as an in-bay payload. In-space demonstration of CFM using LN2 with a few well defined areas of focus would provide the confidence level required to implement subcritical cryogen use and is the first step towards the more far reaching issue of cryogen transfer and tankage resupply. A conceptual approach for CONE was developed and an overview of the program is described including the following: (1) a description of the background and scope of the technology objectives; (2) a description of the payload design and operation; and (3) the justification for CONE relating to potential near term benefits and risk mitigation for future systems. Data and criteria is provided to correlate in-space performance with analytical and numerical modeling of CFM systems.

  9. To study the effect of orbital sling on post operative vision in cases of maxillary carcinoma undergoing total maxillectomy.

    PubMed

    Shukla, Anirudh; Dudeja, Vivek

    2014-06-01

    To study effect of orbital sling on post operative vision in cases of maxillary carcinoma undergoing total maxillectomy. All patients with the principal procedure of "total maxillectomy" for histopathologically proven cases of carcinoma maxilla in department of otorhinolaryngology and head-neck surgery, N.S.C.B. medical college, Jabalapur, Madhya Pradesh, India from July 2011 to October 2013 were included. Out of the 20 patients irrespective of whether orbital sling was created or not, maximum number of patients 8 (40 %) showed a 3 step improvement, and maximum improvement seen was up to five steps. Out of the 14 patients in which orbital sling was created maximum number of patients 7 (50 %) showed a 3 step improvement, and maximum improvement seen was up to five steps. Out of the 6 patients in whom orbital sling was not created maximum number of patients 3 (50 %) showed a 2 step improvement, and maximum improvement seen was up to three steps. Infraorbital repair with the help of sling results in better improvement of vision as compared to those in whom sling was not or could not be made with no significant difference on eye movements.

  10. Earth-Moon Libration Point Orbit Stationkeeping: Theory, Modeling and Operations

    NASA Technical Reports Server (NTRS)

    Folta, David C.; Pavlak, Thomas A.; Haapala, Amanda F.; Howell, Kathleen C.; Woodard, Mark A.

    2013-01-01

    Collinear Earth-Moon libration points have emerged as locations with immediate applications. These libration point orbits are inherently unstable and must be maintained regularly which constrains operations and maneuver locations. Stationkeeping is challenging due to relatively short time scales for divergence effects of large orbital eccentricity of the secondary body, and third-body perturbations. Using the Acceleration Reconnection and Turbulence and Electrodynamics of the Moon's Interaction with the Sun (ARTEMIS) mission orbit as a platform, the fundamental behavior of the trajectories is explored using Poincare maps in the circular restricted three-body problem. Operational stationkeeping results obtained using the Optimal Continuation Strategy are presented and compared to orbit stability information generated from mode analysis based in dynamical systems theory.

  11. Parametric trade studies on a Shuttle 2 launch system architecture

    NASA Technical Reports Server (NTRS)

    Stanley, Douglas O.; Talay, Theodore A.; Lepsch, Roger A.; Morris, W. Douglas; Naftel, J. Christopher; Cruz, Christopher I.

    1991-01-01

    A series of trade studies are presented on a complementary architecture of launch vehicles as a part of a study often referred to as Shuttle-2. The results of the trade studies performed on the vehicles of a reference Shuttle-2 mixed fleet architecture have provided an increased understanding of the relative importance of each of the major vehicle parameters. As a result of trades on the reference booster-orbiter configuration with a methane booster, the study showed that 60 percent of the total liftoff thrust should be on the booster and 40 percent on the orbiter. It was also found that the liftoff thrust to weight ratio (T/W) on the booster-orbiter should be 1.3. This leads to a low dry weight and still provides enough thrust to allow the design of a heavy lift architecture. As a result of another trade study, the dry weight of the reference booster-orbiter was chosen for a variety of operational considerations. Other trade studies on the booster-orbiter demonstrate that the cross feeding of propellant during boost phase is desirable and that engine-out capability from launch to orbit is worth the performance penalty. Technology assumptions made during the Shuttle-2 design were shown to be approx. equivalent to a 25 percent across the board weight reduction over the Space Shuttle technology. The vehicles of the Shuttle-2 architecture were also sized for a wide variety of payloads and missions to different orbits. Many of these same parametric trades were also performed on completely liquid hydrogen fueled fully reusable concepts. If a booster-orbiter is designed using liquid hydrogen engines on both the booster and orbiter, the total vehicle dry weight is only 3.0 percent higher than the reference dual-fuel booster-orbiter, and the gross weight is 3.8 percent less. For this booster-orbiter vehicle, a liftoff T/W of 1.3, a thrust of about 60 percent on the booster, and a Mach staging number of 3 all proved to be desirable. This modest dry weight increase for a liquid hydrogen fueled Shuttle-2 system should be more than offset by the elimination of the entire hydrocarbon engine development program and the savings in operation cost realized by the elimination of an entire fuel type.

  12. Designing Mission Operations for the Gravity Recovery and Interior Laboratory Mission

    NASA Technical Reports Server (NTRS)

    Havens, Glen G.; Beerer, Joseph G.

    2012-01-01

    NASA's Gravity Recovery and Interior Laboratory (GRAIL) mission, to understand the internal structure and thermal evolution of the Moon, offered unique challenges to mission operations. From launch through end of mission, the twin GRAIL orbiters had to be operated in parallel. The journey to the Moon and into the low science orbit involved numerous maneuvers, planned on tight timelines, to ultimately place the orbiters into the required formation-flying configuration necessary. The baseline GRAIL mission is short, only 9 months in duration, but progressed quickly through seven very unique mission phases. Compressed into this short mission timeline, operations activities and maneuvers for both orbiters had to be planned and coordinated carefully. To prepare for these challenges, development of the GRAIL Mission Operations System began in 2008. Based on high heritage multi-mission operations developed by NASA's Jet Propulsion Laboratory and Lockheed Martin, the GRAIL mission operations system was adapted to meet the unique challenges posed by the GRAIL mission design. This paper describes GRAIL's system engineering development process for defining GRAIL's operations scenarios and generating requirements, tracing the evolution from operations concept through final design, implementation, and validation.

  13. Space station needs, attributes and architectural options study. Volume 7-2: Data book. Commercial missions

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The history of NASA's materials processing in space activities is reviewed. Market projections, support requirements, orbital operations issues, cost estimates and candidate systems (orbiter sortie flight, orbiter serviced free flyer, space station, space station serviced free flyer) for the space production of semiconductor crystals are examined. Mission requirements are identified for materials processing, communications missions, bioprocessing, and for transferring aviation maintenance training technology to spacecraft.

  14. How to Take 30 Years Off the Life of an Earth-Orbiter Network

    NASA Technical Reports Server (NTRS)

    Berner, C. D.; Perkins, R. C.; Baker, N.

    1995-01-01

    In the mid 1960's the NASA/JPL Deep Space Network installed a global 26-meter antenna network to support a large group of Low Earth Orbiters and Highly Elliptical Orbiters. Although this network was equipped with then state-of-the-art equipment, operations were labor- intensive. A study is discussed which takes a close look at re- engineering the 26-meter antenna network from all aspects.

  15. Space Construction Experiment Definition Study (SCEDS), part 2. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1982-01-01

    A baseline Space Construction Experiment (SCE) concept is defined. Five characteristics were incorporated: (1) large space system (LSS) element test, (2) shuttle mission payload of opportunity, (3) attachment to Orbiter with jettison capability, (4) Orbiter flight control capabilities, and (5) LSS construction and assembly operations.

  16. Definition of technology development missions for early space station, orbit transfer vehicle servicing. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Orbital Transfer Vehicle (OTV) servicing study scope, propellant transfer, storage and reliquefaction technology development missions (TDM), docking and berthing TDM, maintenance TDM, OTV/payload integration TDM, combined TDMS design, summary space station accomodations, programmatic analysis, and TDM equipment operational usage are discussed.

  17. Systems design study of the Pioneer Venus spacecraft. Volume 1: Technical analyses and tradeoffs, sections 8-12 (part 4 of 4)

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The probe bus and orbiter subsystems are defined, and tradeoffs analyzed. Subsystems discussed include: communications, electric power, data handling, attitude determination and control, propulsion, thermal control, structure and mechanisms, NASA/ESRO orbiter interface, mission operation, and flight support.

  18. A stellar tracking reference system

    NASA Technical Reports Server (NTRS)

    Klestadt, B.

    1971-01-01

    A stellar attitude reference system concept for satellites was studied which promises to permit continuous precision pointing of payloads with accuracies of 0.001 degree without the use of gyroscopes. It is accomplished with the use of a single, clustered star tracker assembly mounted on a non-orthogonal, two gimbal mechanism, driven so as to unwind satellite orbital and orbit precession rates. A set of eight stars was found which assures the presence of an adequate inertial reference on a continuous basis in an arbitrary orbit. Acquisition and operational considerations were investigated and inherent reference redundancy/reliability was established. Preliminary designs for the gimbal mechanism, its servo drive, and the star tracker cluster with its associated signal processing were developed for a baseline sun-synchronous, noon-midnight orbit. The functions required of the onboard computer were determined and the equations to be solved were found. In addition detailed error analyses were carried out, based on structural, thermal and other operational considerations.

  19. An Updated Process for Automated Deepspace Conjunction Assessment

    NASA Technical Reports Server (NTRS)

    Tarzi, Zahi B.; Berry, David S.; Roncoli, Ralph B.

    2015-01-01

    There is currently a high level of interest in the areas of conjunction assessment and collision avoidance from organizations conducting space operations. Current conjunction assessment activity is mainly focused on spacecraft and debris in the Earth orbital environment [1]. However, collisions are possible in other orbital environments as well [2]. This paper will focus on the current operations of and recent updates to the Multimission Automated Deep Space Conjunction Assessment Process (MADCAP) used at the Jet Propulsion Laboratory for NASA to perform conjunction assessment at Mars and the Moon. Various space agencies have satellites in orbit at Mars and the Moon with additional future missions planned. The consequences of collisions are catastrophically high. Intuitive notions predict low probability of collisions in these sparsely populated environments, but may be inaccurate due to several factors. Orbits of scientific interest often tend to have similar characteristics as do the orbits of spacecraft that provide a communications relay for surface missions. The MADCAP process is controlled by an automated scheduler which initializes analysis based on a set timetable or the appearance of new ephemeris files either locally or on the Deep Space Network (DSN) Portal. The process then generates and communicates reports which are used to facilitate collision avoidance decisions. The paper also describes the operational experience and utilization of the automated tool during periods of high activity and interest such as: the close approaches of NASA's Lunar Atmosphere & Dust Environment Explorer (LADEE) and Lunar Reconnaissance Orbiter (LRO) during the LADEE mission. In addition, special consideration was required for the treatment of missions with rapidly varying orbits and less reliable long term downtrack estimates; in particular this was necessitated by perturbations to MAVEN's orbit induced by the Martian atmosphere. The application of special techniques to non-operational spacecraft with large uncertainties is also studied. Areas for future work are also described. Although the applications discussed in this paper are in the Martian and Lunar environments, the techniques are not unique to these bodies and could be applied to other orbital environments.

  20. Copernicus POD Service Operations

    NASA Astrophysics Data System (ADS)

    Fernandez, Jaime; Ayuga, Francisco; Fernandez, Carlos; Peter, Heike; Femenias, Pierre

    2016-08-01

    The Copernicus POD (Precise Orbit Determination) Serviceis part of the Copernicus PDGS Ground Segment of the Sentinel missions. A GMV-led consortium is operating the Copernicus POD Service being in charge of generating precise orbital products and auxiliary data files of Sentinel-1, -2, & -3 missions, for their use as part of the processing chains of the respective Sentinel PDGS.Although the characteristics and the requirements are different for the three missions, the same core POD setup is used to the largest possible extent. At the moment, the CPOD Service is operating 3 satellites: Sentinel-1A, -2A and -3A, and is ready to support operations of Sentinel-1B.This paper presents the status of the CPOD Service in terms of operations and orbital accuracy achieved for the different orbit products of the different missions, focusing on Sentinel-3A preliminary results.

  1. Facility for orbital material processing

    NASA Astrophysics Data System (ADS)

    Starodubov, D.; McCormick, K.; Dellosa, M.; Erdelyi, E.; Volfson, L.

    2018-05-01

    The sustainable orbital manufacturing with commercially viable and profitable operation has tremendous potential for driving the space exploration industry and human expansion into outer space. This highly challenging task has never been accomplished before. The current relatively high delivery cost of materials represents the business challenge of value proposition for making products in space. FOMS Inc. team identified an opportunity of fluoride optical fiber manufacturing in space that can lead to the first commercial production on orbit. To address continued cost effective International Space Station (ISS) operations FOMS Inc. has developed and demonstrated for the first time a fully operational space facility for orbital remote manufacturing with up to 50 km fiber fabrication capability and strong commercial potential for manufacturing operations on board the ISS.

  2. Simulation Based Studies of Low Latency Teleoperations for NASA Exploration Missions

    NASA Technical Reports Server (NTRS)

    Gernhardt, Michael L.; Crues, Edwin Z.; Bielski, Paul; Dexter, Dan; Litaker, Harry L.; Chappell, Steven P.; Beaton, Kara H.; Bekdash, Omar S.

    2017-01-01

    Human exploration of Mars will involve both crewed and robotic systems. Many mission concepts involve the deployment and assembly of mission support assets prior to crew arrival on the surface. Some of these deployment and assembly activities will be performed autonomously while others will be performed using teleoperations. However, significant communications latencies between the Earth and Mars make teleoperations challenging. Alternatively, low latency teleoperations are possible from locations in Mars orbit like Mars' moons Phobos and Deimos. To explore these latency opportunities, NASA is conducting a series of studies to investigate the effects of latency on telerobotic deployment and assembly activities. These studies are being conducted in laboratory environments at NASA's Johnson Space Center (JSC), the Human Exploration Research Analog (HERA) at JSC and the NASA Extreme Environment Mission Operations (NEEMO) underwater habitat off the coast of Florida. The studies involve two human-in-the-loop interactive simulations developed by the NASA Exploration Systems Simulations (NExSyS) team at JSC. The first simulation investigates manipulation related activities while the second simulation investigates mobility related activities. The first simulation provides a simple real-time operator interface with displays and controls for a simulated 6 degree of freedom end effector. The initial version of the simulation uses a simple control mode to decouple the robotic kinematic constraints and a communications delay to model latency effects. This provides the basis for early testing with more detailed manipulation simulations planned for the future. Subjects are tested using five operating latencies that represent teleoperation conditions from local surface operations to orbital operations at Phobos, Deimos and ultimately high Martian orbit. Subject performance is measured and correlated with three distance-to-target zones of interest. Each zone represents a target distance ranging from beyond 10m in Zone 1, through 1 cm to contact in Zone 5 with a step size factor of 10. Collected data consists of both objective simulation data (time, distance, hand controller inputs, velocity) and subjective questionnaire data. The second simulation provides a simple real-time operator interface with displays and control of a simulated surface rover. The rover traverses a synthetic Mars-like terrain and must be maneuvered to avoid obstacles while progressing to its destination. Like the manipulator simulation, subjects are tested using five operating latencies that represent teleoperation conditions from local surface operations to orbital operations at Phobos, Deimos and ultimately high Martian orbit. The rover is also operated at three different traverse speeds to assess the correlation between latency and speed. Collected data consisted of both objective simulation data (time, distance, hand controller inputs, braking) and subjective questionnaire data. These studies are exploring relationships between task complexity, operating speeds, operator efficiencies, and communications latencies for low latency teleoperations in support of human planetary exploration. This paper presents early results from these studies along with the current observations and conclusions. These and planned future studies will help to inform NASA on the potential for low latency teleoperations to support human exploration of Mars and inform the design of robotic systems and exploration missions.

  3. Integrated Simulation Design Challenges to Support TPS Repair Operations

    NASA Technical Reports Server (NTRS)

    Quiocho, Leslie J.; Crues, Edwin Z.; Huynh, An; Nguyen, Hung T.; MacLean, John

    2005-01-01

    During the Orbiter Repair Maneuver (ORM) operations planned for Return to Flight (RTF), the Shuttle Remote Manipulator System (SRMS) must grapple the International Space Station (ISS), undock the Orbiter, maneuver it through a long duration trajectory, and orient it to an EVA crewman poised at the end of the Space Station Remote Manipulator System (SSRMS) to facilitate the repair of the Thermal Protection System (TPS). Once repair has been completed and confirmed, then the SRMS proceeds back through the trajectory to dock the Orbiter to the Orbiter Docking System. In order to support analysis of the complex dynamic interactions of the integrated system formed by the Orbiter, ISS, SRMS, and SSRMS during the ORM, simulation tools used for previous 'nominal' mission support required substantial enhancements. These upgrades were necessary to provide analysts with the capabilities needed to study integrated system performance. This paper discusses the simulation design challenges encountered while developing simulation capabilities to mirror the ORM operations. The paper also describes the incremental build approach that was utilized, starting with the subsystem simulation elements and integration into increasing more complex simulations until the resulting ORM worksite dynamics simulation had been assembled. Furthermore, the paper presents an overall integrated simulation V&V methodology based upon a subsystem level testing, integrated comparisons, and phased checkout.

  4. A Class of Selenocentric Retrograde Orbits With Innovative Applications to Human Lunar Operations

    NASA Technical Reports Server (NTRS)

    Adamo, Daniel R.; Lester, Daniel F.; Thronson, Harley A.; Barbee, Brent

    2014-01-01

    Selenocentric distant retrograde orbits with radii from approx. 12,500 km to approx. 25,000 km are assessed for stability and for suitability as crewed command and control infrastructure locations in support of telerobotic lunar surface operations and interplanetary human transport. Such orbits enable consistent transits to and from Earth at virtually any time if they are coplanar with the Moon's geocentric orbit. They possess multiple attributes and applications distinct from NASA's proposed destination orbit for a redirected asteroid about 70,000 km from the Moon.

  5. Autonomous Aerobraking Development Software: Phase One Performance Analysis at Mars, Venus, and Titan

    NASA Technical Reports Server (NTRS)

    Maddock, Robert W.; Bowes, Angela; Powell, Richard W.; Prince, Jill L. H.; Cianciolo, Alicia Dwyer

    2012-01-01

    When entering orbit about a planet or moon with an appreciable atmosphere, instead of using only the propulsion system to insert the spacecraft into its desired orbit, aerodynamic drag can be used after the initial orbit insertion to further decelerate the spacecraft. Several past NASA missions have used this aerobraking technique to reduce the fuel required to deliver a spacecraft into a desired orbit. Aerobraking was first demonstrated at Venus with Magellan in 1993 and then was used to achieve the science orbit of three Mars orbiters: Mars Global Surveyor in 1997, Mars Odyssey in 2001, and Mars Reconnaissance Orbiter in 2006. Although aerobraking itself reduces the propellant required to reach a final low period orbit, it does so at the expense of additional mission time to accommodate the aerobraking operations phase (typically 3-6 months), a large mission operations staff, and significant Deep Space Network (DSN) coverage. By automating ground based tasks and analyses associated with aerobraking and moving these onboard the spacecraft, a flight project could save millions of dollars in operations staffing and DSN costs (Ref. 1).

  6. 47 CFR 25.164 - Milestones.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Milestones. (a) Licensees of geostationary orbit satellite systems other than DBS and DARS satellite systems...) Licensees of non-geostationary orbit satellite systems other than DBS and DARS satellite systems licensed on... placed in the authorized orbital location or non-geostationary orbit(s) and that in-orbit operation of...

  7. Sentinel-2A: Orbit Modelling Improvements and their Impact on the Orbit Prediction

    NASA Astrophysics Data System (ADS)

    Peter, Heike; Otten, Michiel; Fernández Sánchez, Jaime; Fernández Martín, Carlos; Féménias, Pierre

    2016-07-01

    Sentinel-2A is the second satellite of the European Copernicus Programme. The satellite has been launched on 23rd June 2015 and it is operational since mid October 2015. This optical mission carries a GPS receiver for precise orbit determination. The Copernicus POD (Precise Orbit Determination) Service is in charge of generating precise orbital products and auxiliary files for Sentinel-2A as well as for the Sentinel-1 and -3 missions. The accuracy requirements for the Sentinel-2A orbit products are not very stringent with 3 m in 3D (3 sigma) for the near real-time (NRT) orbit and 10 m in 2D (3 sigma) for the predicted orbit. The fulfilment of the orbit accuracy requirements is normally not an issue. The Copernicus POD Service aims, however, to provide the best possible orbits for all three Sentinel missions. Therefore, a sophisticated box-wing model is generated for the Sentinel-2 satellite as it is done for the other two missions as well. Additionally, the solar wing of the satellite is rewound during eclipse, which has to be modelled accordingly. The quality of the orbit prediction is dependent on the results of the orbit estimation performed before it. The values of the last estimation of each parameter is taken for the orbit propagation, i.e. estimating ten atmospheric drag coefficients per 24h, the value of the last coefficient is used as a fix parameter for the subsequent orbit prediction. The question is whether the prediction might be stabilised by, e.g. using an average value of all ten coefficients. This paper presents the status and the quality of the Sentinel-2 orbit determination in the operational environment of the Copernicus POD Service. The impact of the orbit model improvements on the NRT and predicted orbits is studied in detail. Changes in the orbit parametrization as well as in the settings for the orbit propagation are investigated. In addition, the impact of the quality of the input GPS orbit and clock product on the Sentinel-2A orbit prediction results is checked. The results of this study do not only improve the Sentinel-2 orbit products but will also support the generation of reliable orbit predictions for the Sentinel-3 mission. The Sentinel-3 satellite is equipped with a laser retro-reflector and reliable orbit predictions are, therefore, very important to guarantee a continuous support of the satellite laser tracking stations.

  8. Optical Studies of Space Debris at GEO: Survey and Follow-up with Two Telescopes

    NASA Technical Reports Server (NTRS)

    Seitzer, P.; Abercomby, K. J.; Rodriquez, H. M.; Barker, E. S.

    2007-01-01

    For 14 nights in March 2007, we used two telescopes at the Cerro Tololo Inter-American Observatory (CTIO) in Chile to study the nature of space debris at Geosynchronous Earth Orbit (GEO). In this project one telescope was dedicated to survey operations, while a second telescope was used for follow-up observations for orbits and colors. The goal was to obtain orbital and photometric information on every faint object found with the survey telescope. Thus we concentrate on objects fainter than R = 15th magnitude.

  9. Study of Required Thrust Profile Determination of a Three Stages Small Launch Vehicle

    NASA Astrophysics Data System (ADS)

    Fariz, A.; Sasongko, R. A.; Poetro, R. E.

    2018-04-01

    The effect of solid rocket motor specifications, i.e. specific impulse and mass flow rate, and coast time on the thrust profile of three stages small launch vehicle is studied. Solid rocket motor specifications are collected from various small launch vehicle that had ever been in operation phase, and also from previous study. Comparison of orbital parameters shows that the radius of apocenter targeted can be approached using one combination of solid rocket motor specifications and appropriate coast time. However, the launch vehicle designed is failed to achieve the targeted orbit nor injecting the satellite to any orbit.

  10. Interactive orbital proximity operations planning system

    NASA Technical Reports Server (NTRS)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1989-01-01

    An interactive, graphical proximity operations planning system was developed which allows on-site design of efficient, complex, multiburn maneuvers in the dynamic multispacecraft environment about the space station. Maneuvering takes place in, as well as out of, the orbital plane. The difficulty in planning such missions results from the unusual and counterintuitive character of relative orbital motion trajectories and complex operational constraints, which are both time varying and highly dependent on the mission scenario. This difficulty is greatly overcome by visualizing the relative trajectories and the relative constraints in an easily interpretable, graphical format, which provides the operator with immediate feedback on design actions. The display shows a perspective bird's-eye view of the space station and co-orbiting spacecraft on the background of the station's orbital plane. The operator has control over two modes of operation: (1) a viewing system mode, which enables him or her to explore the spatial situation about the space station and thus choose and frame in on areas of interest; and (2) a trajectory design mode, which allows the interactive editing of a series of way-points and maneuvering burns to obtain a trajectory which complies with all operational constraints. Through a graphical interactive process, the operator will continue to modify the trajectory design until all operational constraints are met. The effectiveness of this display format in complex trajectory design is presently being evaluated in an ongoing experimental program.

  11. 47 CFR 25.261 - Procedures for avoidance of in-line interference events for Non Geostationary Satellite Orbit...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... interference events for Non Geostationary Satellite Orbit (NGSO) Satellite Network Operations in the Fixed... avoidance of in-line interference events for Non Geostationary Satellite Orbit (NGSO) Satellite Network... procedures in this section apply to non-Federal-Government NGSO FSS satellite networks operating in the...

  12. 47 CFR 25.261 - Procedures for avoidance of in-line interference events for Non Geostationary Satellite Orbit...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... interference events for Non Geostationary Satellite Orbit (NGSO) Satellite Network Operations in the Fixed... avoidance of in-line interference events for Non Geostationary Satellite Orbit (NGSO) Satellite Network... procedures in this section apply to non-Federal-Government NGSO FSS satellite networks operating in the...

  13. Integrated orbital servicing and payloads study. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1975-01-01

    A study is summarized in which a comparison was made of the following modes of maintaining a satellite system: (1) expendable mode in which failed satellites are replaced, (2) on-orbit servicing where a satellite can be fixed by unmanned module exchange in space, and (3) ground refurbishment in which the satellite is brought back to ground for repairs. It was concluded that on-orbit maintenance is the most cost-effective mode and that it is technically feasible. It can be used to repair failed satellites, to improve reliability of operating satellites, and to update equipment. On-orbit servicing can increase program flexibility and satellite reliability, lifetime, and availability. The significant conclusions and results of two studies are summarized.

  14. Shuttle OFT Level C navigation requirements

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Detailed requirements for the orbital operations computer loads, OPS 2, and OPS 8 are given. These requirements represent the total on-orbit/rendezvous navigation baseline requirements for the following principal functions: on-orbital/rendezvous navigation sequencer; on-orbit/rendezvous UPP sequencer; on-orbit rendezvous navigation; on-orbit prediction; on-orbit user parameter processing; and landing Site update.

  15. Study the Space Debris Impact in the Early Stages of the Nano-Satellite Design

    NASA Astrophysics Data System (ADS)

    Mahdi, Mohammed Chessab

    2016-12-01

    The probability of KufaSat collisions with different sizes of orbital debris and with other satellites which operating in the same orbit during orbital lifetime was determined. Apogee/Perigee Altitude History was used to graph apogee and perigee altitudes over KufaSat lifetime. The required change in velocity for maneuvers necessary to reentry atmospheric within 25 years was calculated. The prediction of orbital lifetime of KufaSat using orbital parameters and engineering specifications as inputs to the Debris Assessment Software (DAS) was done, it has been verified that the orbital lifetime will not be more than 25 years after end of mission which is compatible with recommendation of Inter-Agency Space Debris Coordination Committee (IADC).

  16. Modeling Ionosphere Environments: Creating an ISS Electron Density Tool

    NASA Technical Reports Server (NTRS)

    Gurgew, Danielle N.; Minow, Joseph I.

    2011-01-01

    The International Space Station (ISS) maintains an altitude typically between 300 km and 400 km in low Earth orbit (LEO) which itself is situated in the Earth's ionosphere. The ionosphere is a region of partially ionized gas (plasma) formed by the photoionization of neutral atoms and molecules in the upper atmosphere of Earth. It is important to understand what electron density the spacecraft is/will be operating in because the ionized gas along the ISS orbit interacts with the electrical power system resulting in charging of the vehicle. One instrument that is already operational onboard the ISS with a goal of monitoring electron density, electron temperature, and ISS floating potential is the Floating Potential Measurement Unit (FPMU). Although this tool is a valuable addition to the ISS, there are limitations concerning the data collection periods. The FPMU uses the Ku band communication frequency to transmit data from orbit. Use of this band for FPMU data runs is often terminated due to necessary observation of higher priority Extravehicular Activities (EVAs) and other operations on ISS. Thus, large gaps are present in FPMU data. The purpose of this study is to solve the issue of missing environmental data by implementing a secondary electron density data source, derived from the COSMIC satellite constellation, to create a model of ISS orbital environments. Extrapolating data specific to ISS orbital altitudes, we model the ionospheric electron density along the ISS orbit track to supply a set of data when the FPMU is unavailable. This computer model also provides an additional new source of electron density data that is used to confirm FPMU is operating correctly and supplements the original environmental data taken by FPMU.

  17. Lunar mission safety and rescue: Escape/rescue analysis and plan

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The results are presented of the technical analysis of escape/rescue/survival situations, crew survival techniques, alternate escape/rescue approaches and vehicles, and the advantages and disadvantages of each for advanced lunar exploration. Candidate escape/rescue guidelines are proposed and elements of a rescue plan developed. The areas of discussions include the following: lunar arrival/departure operations, lunar orbiter operations, lunar surface operations, lunar surface base escape/rescue analysis, lander tug location operations, portable airlock, emergency pressure suit, and the effects of no orbiting lunar station, no lunar surface base, and no foreign lunar orbit/surface operations on the escape/rescue plan.

  18. Berthing simulator for space station and orbiter

    NASA Technical Reports Server (NTRS)

    Veerasamy, Sam

    1991-01-01

    The development of a real-time man-in-the-loop berthing simulator is in progress at NASA Lyndon B. Johnson Space Center (JSC) to conduct a parametric study and to measure forces during contact conditions of the actual docking mechanisms for the Space Station Freedom and the orbiter. In berthing, the docking ports of the Space Station and the orbiter are brought together using the orbiter robotic arm to control the relative motion of the vehicles. The berthing simulator consists of a dynamics docking test system (DDTS), computer system, simulator software, and workstations. In the DDTS, the Space Station, and the orbiter docking mechanisms are mounted on a six-degree-of-freedom (6 DOF) table and a fixed platform above the table. Six load cells are used on the fixed platform to measure forces during contact conditions of the docking mechanisms. Two Encore Concept 32/9780 computers are used to simulate the orbiter robotic arm and to operate the berthing simulator. A systematic procedure for a real-time dynamic initialization is being developed to synchronize the Space Station docking port trajectory with the 6 DOF table movement. The berthing test can be conducted manually or automatically and can be extended for any two orbiting vehicles using a simulated robotic arm. The real-time operation of the berthing simulator is briefly described.

  19. Machine vision for real time orbital operations

    NASA Technical Reports Server (NTRS)

    Vinz, Frank L.

    1988-01-01

    Machine vision for automation and robotic operation of Space Station era systems has the potential for increasing the efficiency of orbital servicing, repair, assembly and docking tasks. A machine vision research project is described in which a TV camera is used for inputing visual data to a computer so that image processing may be achieved for real time control of these orbital operations. A technique has resulted from this research which reduces computer memory requirements and greatly increases typical computational speed such that it has the potential for development into a real time orbital machine vision system. This technique is called AI BOSS (Analysis of Images by Box Scan and Syntax).

  20. In-orbit operation of the soft x-ray spectrometer onboard the Hitomi satellite

    NASA Astrophysics Data System (ADS)

    Tsujimoto, Masahiro; Mitsuda, Kazuhisa; Kelley, Richard L.; den Herder, Jan-Willem; Bialas, Thomas G.; Boyce, Kevin R.; Chiao, Meng P.; de Vries, Cor P.; DiPirro, Michael J.; Eckart, Megan E.; Ezoe, Yuichiro; Fujimoto, Ryuichi; Hoshino, Akio; Ishikawa, Kumi; Ishisaki, Yoshitaka; Kilbourne, Caroline A.; Koyama, Shu; Leutenegger, Maurice A.; Masters, Candace M.; Mitsuishi, Ikuyuki; Noda, Hirofumi; Okajima, Takashi; Okamoto, Atsushi; Porter, Frederic S.; Sato, Kosuke; Sato, Yohichi; Savinell, Joseph C.; Sawada, Makoto; Seta, Hiromi; Shirron, Peter J.; Sneiderman, Gary A.; Takei, Yoh; Tamagawa, Toru; Tashiro, Makoto S.; Watanabe, Tomomi; Yamada, Shinya; Yamasaki, Noriko Y.; Yatsu, Yoichi

    2018-01-01

    We summarize all of the in-orbit operations of the soft x-ray spectrometer (SXS) onboard the ASTRO-H (Hitomi) satellite. The satellite was launched on February 17, 2016, and the communication with the satellite ceased on March 26, 2016. The SXS was still in the commissioning phase, in which the set-ups were progressively changed. This paper is intended to serve as a concise reference of the events in orbit in order to properly interpret the SXS data taken during its short lifetime and as a test case for planning the in-orbit operation for future microcalorimeter missions.

  1. In-space propellant logistics. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The study addresses the systems and operational problems associated with the transport, transfer, and storage of cryogenic propellants in low earth orbits. The safety problems connected with in-space propellant logistics operations are also considered.Correlation between the two projects was maintained by including safety considerations, resulting from the system safety analysis, in the trade studies and evaluations of alternate operating concepts in the systems operations analysis.

  2. Space shuttle pogo studies. [systems stability

    NASA Technical Reports Server (NTRS)

    Coppolino, R. N.; Lock, M. H.; Rubin, S.

    1977-01-01

    Topics covered include: (1) pogo suppression for main propulsion subsystem operation; (2) application of quarter-scale low pressure oxidizer turbopump transfer functions; (3) pogo stability during orbital maneuvering subsystem operation; and (4) errors in frequency response measurements.

  3. Compendium of Information for Interpreting the Microgravity Environment of the Orbiter Spacecraft

    NASA Technical Reports Server (NTRS)

    DeLombard, Richard

    1996-01-01

    Science experiments are routinely conducted on the NASA shuttle orbiter vehicles. Primarily, these experiments are operated on such missions to take advantage of the microgravity (low-level acceleration) environment conditions during on-orbit operations. Supporting accelerometer instruments are operated with the experiments to measure the microgravity acceleration environment in which the science experiments were operated. Tne Principal Investigator Microgravity Services (PIMS) Project at NASA Lewis Research Center interprets these microgravity acceleration data and prepares mission summary reports to aid the principal investigators of the scientific experiments in understanding the microgravity environment. Much of the information about the orbiter vehicle and the microgravity environment remains the same for each mission. Rather than repeat that information in each mission summary report, reference information is presented in this report to assist users in understanding the microgravity-acceleration data. The characteristics of the microgravity acceleration environment are first presented. The methods of measurement and common instruments used on orbiter missions are described. The coordinate systems utilized in the orbiter and accelerometers are described. Some of the orbiter attitudes utilized in microgravity related missions are illustrated. Methods of data processing are described and illustrated. The interpretation of the microgravity acceleration data is included with an explanation of common disturbance sources. Instructions to access some of the acceleration data and a description of the orbiter thrusters are explained in the appendixes. A microgravity environment bibliography is also included.

  4. Satellite Power System (SPS) concept definition study (exhibit C)

    NASA Technical Reports Server (NTRS)

    Haley, G. M.

    1979-01-01

    The major outputs of the study are the constructability studies which resulted in the definition of the concepts for satellite, rectenna, and satellite construction base construction. Transportation analyses resulted in definition of heavy-lift launch vehicle, electric orbit transfer vehicle, personnel orbit transfer vehicle, and intra-orbit transfer vehicle as well as overall operations related to transportation systems. The experiment/verification program definition resulted in the definition of elements for the Ground-Based Experimental Research and Key Technology plans. These studies also resulted in conceptual approaches for early space technology verification. The cost analysis defined the overall program and cost data for all program elements and phases.

  5. Parametric studies and orbital analysis for an electric orbit transfer vehicle space flight demonstration

    NASA Astrophysics Data System (ADS)

    Avila, Edward R.

    The Electric Insertion Transfer Experiment (ELITE) is an Air Force Advanced Technology Transition Demonstration which is being executed as a cooperative Research and Development Agreement between the Phillips Lab and TRW. The objective is to build, test, and fly a solar-electric orbit transfer and orbit maneuvering vehicle, as a precursor to an operational electric orbit transfer vehicle (EOTV). This paper surveys some of the analysis tools used to do parametric studies and discusses the study results. The primary analysis tool was the Electric Vehicle Analyzer (EVA) developed by the Phillips Lab and modified by The Aerospace Corporation. It uses a simple orbit averaging approach to model low-thrust transfer performance, and runs in a PC environment. The assumptions used in deriving the EVA math model are presented. This tool and others surveyed were used to size the solar array power required for the spacecraft, and develop a baseline mission profile that meets the requirements of the ELITE mission.

  6. Orbit Transfer Vehicle (OTV) advanced expander cycle engine point design study. Volume 3: Engine data summary

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The engine operating characteristics were examined. Inlet pressure effects, tank pressurization effects, steady-state specific impulse, and the steady-state cycle were studied. The propellant flow schematic and operating sequence are presented. Engine hardware drawings are included.

  7. Combined orbits and clocks from IGS second reprocessing

    NASA Astrophysics Data System (ADS)

    Griffiths, Jake

    2018-05-01

    The Analysis Centers (ACs) of the International GNSS Service (IGS) have reprocessed a large global network of GPS tracking data from 1994.0 until 2014.0 or later. Each AC product time series was extended uniformly till early 2015 using their weekly operational IGS contributions so that the complete combined product set covers GPS weeks 730 through 1831. Three ACs also included GLONASS data from as early as 2002 but that was insufficient to permit combined GLONASS products. The reprocessed terrestrial frame combination procedures and results have been reported already, and those were incorporated into the ITRF2014 multi-technique global frame released in 2016. This paper describes the orbit and clock submissions and their multi-AC combinations and assessments. These were released to users in early 2017 in time for the adoption of IGS14 for generating the operational IGS products. While the reprocessing goal was to enable homogeneous modeling, consistent with the current operational procedures, to be applied retrospectively to the full history of observation data in order to achieve a more suitable reference for geophysical studies, that objective has only been partially achieved. Ongoing AC analysis changes and a lack of full participation limit the consistency and precision of the finished IG2 products. Quantitative internal measures indicate that the reprocessed orbits are somewhat less precise than current operational orbits or even the later orbits from the first IGS reprocessing campaign. That is even more apparent for the clocks where a lack of robust AC participation means that it was only possible to form combined 5-min clocks but not the 30-s satellite clocks published operationally. Therefore, retrospective precise point positioning solutions by users are not recommended using the orbits and clocks. Nevertheless, the orbits do support long-term stable user solutions when used with network processing with either double differencing or explicit clock estimation. Among the main benefits of the reprocessing effort is a more consistent long product set to analyze for sources of systematic error and accuracy. Work to do that is underway but the reprocessing experience already points to a number of ways future IGS performance and reprocessing campaigns can be improved.

  8. The Copernicus POD Service and beyond: Scientific exploitation of the orbit-related data and products

    NASA Astrophysics Data System (ADS)

    Peter, Heike; Fernández, Jaime; Fernández, Carlos; Féménias, Pierre

    2017-04-01

    The Copernicus POD (Precise Orbit Determination) Service is part of the Copernicus Processing Data Ground Segment (PDGS) of the Sentinel-1, -2 and -3 missions. A GMV-led consortium is operating the Copernicus POD Service being in charge of generating precise orbital products and auxiliary data files for their use as part of the processing chains of the respective Sentinel PDGS. The orbital products are available through the dedicated Copernicus data hub. The Copernicus POD Service is supported by the Copernicus POD Quality Working Group (QWG) for the validation of the orbit product accuracy. The QWG is delivering independent orbit solutions for the satellites. The cross-comparison of all these orbit solutions is essential to monitor and to improve the orbit accuracy because for Sentinel-1 and -2 this is the only possibility to externally assess the quality of the orbits. Each of the Sentinel-1, -2, and -3 satellites carries dual-frequency GPS receivers delivering the necessary measurements for the precise orbit determination of the satellites. The Sentinel-3 satellites are additionally equipped with a DORIS (Doppler Orbitography and Radiopositioning Integrated by Satellite) receiver and a Laser Retro Reflector for Satellite Laser Ranging. These two additional observation techniques allow for independent validation of the GPS-derived orbit determination results and for studying biases between the different techniques. The scientific exploitation of the orbit determination and the corresponding input data is manifold. Sophisticated satellite macro models improve the modelling of the non-gravitational forces acting on the satellite. On the other hand, comparisons to orbits based on pure empirical modelling of the non-gravitational forces help to sort out deficiencies in the satellite geometry information. The dual-frequency GPS data delivered by the satellites can give valuable input for ionospheric studies important for Space Weather research. So-called kinematic orbits, being a time series of discrete satellite positions derived from GPS, may be used for the modelling of the time-variable low degree harmonics of the Earth's gravity field. This is very important to support filling the possible gap between the dedicated gravity field missions GRACE and GRACE Follow-on. Many other important research topics could be mentioned here as well. Therefore a broad scientific community could benefit of an open access not only to the operational orbits (which is partially available today), but also to the GPS observations, satellite attitude and other ancillary information to perform POD. This poster presents firstly the status of the Copernicus POD Service in terms of products generated, accuracy and timeliness of the operational orbital products and all potential inputs available. Then the main focus of the poster is to outline the possibilities for scientific exploitation of the orbit determination and the corresponding input data. The great scientific potential of these data is explained to confirm the need of making them publicly available for scientists.

  9. The binary Asteroid 22 Kalliope: Linus orbit determination on the basis of speckle interferometric observations

    NASA Astrophysics Data System (ADS)

    Sokova, I. A.; Sokov, E. N.; Roschina, E. A.; Rastegaev, D. A.; Kiselev, A. A.; Balega, Yu. Yu.; Gorshanov, D. L.; Malogolovets, E. V.; Dyachenko, V. V.; Maksimov, A. F.

    2014-07-01

    In this paper we present the orbital elements of Linus satellite of 22 Kalliope asteroid. Orbital element determination is based on the speckle interferometry data obtained with the 6-m BTA telescope operated by SAO RAS. We processed 9 accurate positions of Linus orbiting around the main component of 22 Kalliope between 10 and 16 December, 2011. In order to determine the orbital elements of the Linus we have applied the direct geometric method. The formal errors are about 5 mas. This accuracy makes it possible to study the variations of the Linus orbital elements influenced by different perturbations over the course of time. Estimates of six classical orbital elements, such as the semi-major axis of the Linus orbit a = 1109 ± 6 km, eccentricity e = 0.016 ± 0.004, inclination i = 101° ± 1° to the ecliptic plane and others, are presented in this work.

  10. Shuttle payload interface verification equipment study. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1976-01-01

    A preliminary design analysis of a stand alone payload integration device (IVE) is provided that is capable of verifying payload compatibility in form, fit and function with the shuttle orbiter prior to on-line payload/orbiter operations. The IVE is a high fidelity replica of the orbiter payload accommodations capable of supporting payload functional checkout and mission simulation. A top level payload integration analysis developed detailed functional flow block diagrams of the payload integration process for the broad spectrum of P/L's and identified degree of orbiter data required by the payload user and potential applications of the IVE.

  11. Orbital spacecraft consumables resupply

    NASA Technical Reports Server (NTRS)

    Dominick, Sam M.; Eberhardt, Ralph N.; Tracey, Thomas R.

    1988-01-01

    The capability to replenish spacecraft, satellites, and laboratories on-orbit with consumable fluids provides significant increases in their cost and operational effectiveness. Tanker systems to perform on-orbit fluid resupply must be flexible enough to operate from the Space Transportation System (STS), Space Station, or the Orbital Maneuvering Vehicle (OMV), and to accommodate launch from both the Shuttle and Expendable Launch Vehicles (ELV's). Resupply systems for storable monopropellant hydrazine and bipropellants, and water have been developed. These studies have concluded that designing tankers capable of launch on both the Shuttle and ELV's was feasible and desirable. Design modifications and interfaces for an ELV launch of the tanker systems were identified. Additionally, it was determined that modularization of the tanker subsystems was necessary to provide the most versatile tanker and most efficient approach for use at the Space Station. The need to develop an automatic umbilical mating mechanism, capable of performing both docking and coupler mating functions was identified. Preliminary requirements for such a mechanism were defined. The study resulted in a modular tanker capable of resupplying monopropellants, bipropellants, and water with a single design.

  12. Computer simulation of on-orbit manned maneuvering unit operations

    NASA Technical Reports Server (NTRS)

    Stuart, G. M.; Garcia, K. D.

    1986-01-01

    Simulation of spacecraft on-orbit operations is discussed in reference to Martin Marietta's Space Operations Simulation laboratory's use of computer software models to drive a six-degree-of-freedom moving base carriage and two target gimbal systems. In particular, key simulation issues and related computer software models associated with providing real-time, man-in-the-loop simulations of the Manned Maneuvering Unit (MMU) are addressed with special attention given to how effectively these models and motion systems simulate the MMU's actual on-orbit operations. The weightless effects of the space environment require the development of entirely new devices for locomotion. Since the access to space is very limited, it is necessary to design, build, and test these new devices within the physical constraints of earth using simulators. The simulation method that is discussed here is the technique of using computer software models to drive a Moving Base Carriage (MBC) that is capable of providing simultaneous six-degree-of-freedom motions. This method, utilized at Martin Marietta's Space Operations Simulation (SOS) laboratory, provides the ability to simulate the operation of manned spacecraft, provides the pilot with proper three-dimensional visual cues, and allows training of on-orbit operations. The purpose here is to discuss significant MMU simulation issues, the related models that were developed in response to these issues and how effectively these models simulate the MMU's actual on-orbiter operations.

  13. NEP processing, operations, and disposal

    NASA Technical Reports Server (NTRS)

    Stancati, Mike

    1993-01-01

    Several recent studies by ASAO/NPO staff members at LeRC and by other organizations have highlighted the potential benefits of using Nuclear Electric Propulsion (NEP) as the primary transportation means for some of the proposed missions of the Space Exploration Initiative. These include the potential to reduce initial mass in orbit and Mars transit time. Modular NEP configurations also introduce fully redundant main propulsion to Mars flight systems adding several abort or fall back options not otherwise available. Recent studies have also identified mission operations, such as on orbital assembly, refurbishment, and reactor disposal, as important discriminators for propulsion system evaluation. This study is intended to identify and assess 'end-to-end' operational issues associated with using NEP for transporting crews and cargo between Earth and Mars. We also include some consideration of lunar cargo transfer as well.

  14. Orbit Stability of OSIRIS-REx in the Vicinity of Bennu Using a High-Fidelity Solar Radiation Model

    NASA Technical Reports Server (NTRS)

    Williams, Trevor; Hughes, Kyle; Mashiku, Alinda; Longuski, James

    2015-01-01

    The OSIRIS-REx mission (Origins Spectral Interpretation Resource Identification Security Regolith EXPlorer) is an asteroid sample return mission to Bennu (RQ36) that is scheduled to launch in 2016. The planned science operations precluding the small retrieval involve operations in terminator orbits (orbit plane is perpendicular to the sun). Over longer durations the solar radiation pressure (SRP) perturbs the orbit causing it to precess. Our work involves: modeling high fidelity SRP model to capture the perturbations during attitude changes; design a stable orbit from the high fidelity models to analyze the stability over time.

  15. Space Shuttle Orbiter Approach and Landing Test Evaluation Report. Captive-Active Flight Test Summary

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Captive-active tests consisted of three mated carrier aircraft/Orbiter flights with an active manned Orbiter. The objectives of this series of flights were to (1) verify the separation profile, (2) verify the integrated structure, aerodynamics, and flight control system, (3) verify Orbiter integrated system operations, and (4) refine and finalize carrier aircraft, Orbiter crew, and ground procedures in preparation for free flight tests. A summary description of the flights is presented with assessments of flight test requirements, and of the performance operations, and of significant flight anomalies is included.

  16. OSO-6 Orbiting Solar Observatory

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The description, development history, test history, and orbital performance analysis of the OSO-6 Orbiting Solar Observatory are presented. The OSO-6 Orbiting Solar Observatory was the sixth flight model of a series of scientific spacecraft designed to provide a stable platform for experiments engaged in the collection of solar and celestial radiation data. The design objective was 180 days of orbital operation. The OSO-6 has telemetered an enormous amount of very useful experiment and housekeeping data to GSFC ground stations. Observatory operation during the two-year reporting period was very successful except for some experiment instrument problems.

  17. GEODYN system description, volume 1. [computer program for estimation of orbit and geodetic parameters

    NASA Technical Reports Server (NTRS)

    Chin, M. M.; Goad, C. C.; Martin, T. V.

    1972-01-01

    A computer program for the estimation of orbit and geodetic parameters is presented. The areas in which the program is operational are defined. The specific uses of the program are given as: (1) determination of definitive orbits, (2) tracking instrument calibration, (3) satellite operational predictions, and (4) geodetic parameter estimation. The relationship between the various elements in the solution of the orbit and geodetic parameter estimation problem is analyzed. The solution of the problems corresponds to the orbit generation mode in the first case and to the data reduction mode in the second case.

  18. Ground operation of robotics on Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Wojcik, Z. Alex; Hunter, David G.; Cantin, Marc R.

    1993-01-01

    This paper reflects work carried out on Ground Operated Telerobotics (GOT) in 1992 to refine further the ideas, procedures, and technologies needed to test the procedures in a high latency environment, and to integrate GOT into Space Station Freedom operations. Space Station Freedom (SSF) will be in operation for 30 years, and will depend on robots to carry out a significant part of the assembly, maintenance, and utilization workload. Current plans call for on-orbit robotics to be operated by on-board crew members. This approach implies that on-orbit robotics operations use up considerable crew time, and that these operations cannot be carried out when SSF is unmanned. GOT will allow robotic operations to be operated from the ground, with on-orbit crew interventions only when absolutely required. The paper reviews how GOT would be implemented, how GOT operations would be planned and supported, and reviews GOT issues, critical success factors, and benefits.

  19. Ground operation of robotics on Space Station Freedom

    NASA Astrophysics Data System (ADS)

    Wojcik, Z. Alex; Hunter, David G.; Cantin, Marc R.

    1993-03-01

    This paper reflects work carried out on Ground Operated Telerobotics (GOT) in 1992 to refine further the ideas, procedures, and technologies needed to test the procedures in a high latency environment, and to integrate GOT into Space Station Freedom operations. Space Station Freedom (SSF) will be in operation for 30 years, and will depend on robots to carry out a significant part of the assembly, maintenance, and utilization workload. Current plans call for on-orbit robotics to be operated by on-board crew members. This approach implies that on-orbit robotics operations use up considerable crew time, and that these operations cannot be carried out when SSF is unmanned. GOT will allow robotic operations to be operated from the ground, with on-orbit crew interventions only when absolutely required. The paper reviews how GOT would be implemented, how GOT operations would be planned and supported, and reviews GOT issues, critical success factors, and benefits.

  20. An Overview of the Jupiter Europa Orbiter Concept's Europa Science Phase Orbit Design

    NASA Technical Reports Server (NTRS)

    Lock, Robert E.; Ludwinski, Jan M.; Petropoulos, Anastassios E.; Clark, Karla B.; Pappalardo, Robert T.

    2009-01-01

    Jupiter Europa Orbiter (JEO), the proposed NASA element of the proposed joint NASA-ESA Europa Jupiter System Mission (EJSM), could launch in February 2020 and conceivably arrive at Jupiter in December of 2025. The concept is to perform a multi-year study of Europa and the Jupiter system, including 30 months of Jupiter system science and a comprehensive Europa orbit phase of 9 months. This paper provides an overview of the JEO concept and describes the Europa Science phase orbit design and the related science priorities, model pay-load and operations scenarios needed to conduct the Europa Science phase. This overview is for planning and discussion purposes only.

  1. Orbital transfer of large space structures with nuclear electric rockets

    NASA Technical Reports Server (NTRS)

    Silva, T. H.; Byers, D. C.

    1980-01-01

    This paper discusses the potential application of electric propulsion for orbit transfer of a large spacecraft structure from low earth orbit to geosynchronous altitude in a deployed configuration. The electric power was provided by the spacecraft nuclear reactor space power system on a shared basis during transfer operations. Factors considered with respect to system effectiveness included nuclear power source sizing, electric propulsion thruster concept, spacecraft deployment constraints, and orbital operations and safety. It is shown that the favorable total impulse capability inherent in electric propulsion provides a potential economic advantage over chemical propulsion orbit transfer vehicles by reducing the number of Space Shuttle flights in ground-to-orbit transportation requirements.

  2. Spaceliner Class Operability Gains Via Combined Airbreathing/ Rocket Propulsion: Summarizing an Operational Assessment of Highly Reusable Space Transports

    NASA Technical Reports Server (NTRS)

    Nix, Michael B.; Escher, William J. d.

    1999-01-01

    In discussing a new NASA initiative in advanced space transportation systems and technologies, the Director of the NASA Marshall Space Flight Center, Arthur G. Stephenson, noted that, "It would use new propulsion technology, air-breathing engine so you don't have to carry liquid oxygen, at least while your flying through the atmosphere. We are calling it Spaceliner 100 because it would be 100 times cheaper, costing $ 100 dollars a pound to orbit." While airbreathing propulsion is directly named, rocket propulsion is also implied by, "... while you are flying through the atmosphere." In-space final acceleration to orbital speed mandates rocket capabilities. Thus, in this informed view, Spaceliner 100 will be predicated on combined airbreathing/rocket propulsion, the technical subject of this paper. Interestingly, NASA's recently concluded Highly Reusable Space Transportation (HRST) study focused on the same affordability goal as that of the Spaceliner 100 initiative and reflected the decisive contribution of combined propulsion as a way of expanding operability and increasing the design robustness of future space transports, toward "aircraft like" capabilities. The HRST study built on the Access to Space Study and the Reusable Launch Vehicle (RLV) development activities to identify and characterize space transportation concepts, infrastructure and technologies that have the greatest potential for reducing delivery cost by another order of magnitude, from $1,000 to $100-$200 per pound for 20,000 lb. - 40.000 lb. payloads to low earth orbit (LEO). The HRST study investigated a number of near-term, far-term, and very far-term launch vehicle concepts including all-rocket single-stage-to-orbit (SSTO) concepts, two-stage-to-orbit (TSTO) concepts, concepts with launch assist, rocket-based combined cycle (RBCC) concepts, advanced expendable vehicles, and more far term ground-based laser powered launchers. The HRST study consisted of preliminary concept studies, assessments and analysis tool development for advanced space transportation systems, followed by end-to-end system concept definitions and trade analyses, specific system concept definition and analysis, specific key technology and topic analysis, system, operational and economics model development, analysis, and integrated assessments. The HRST Integration Task Force (HITF) was formed to synthesize study results in several specific topic areas and support the development of conclusions from the study: Systems Concepts Definitions, Technology Assessment, Operations Assessment, and Cost Assessment. This paper summarizes the work of the Operations Assessment Team: the six approaches used, the analytical tools and methodologies developed and employed, the issues and concerns, and the results of the assessment. The approaches were deliberately varied in measures of merit and procedure to compensate for the uncertainty inherent in operations data in this early phase of concept exploration. In general, rocket based combined cycle (RBCC) concepts appear to have significantly greater potential than all-rocket concepts for reducing operations costs.

  3. Interactive orbital proximity operations planning system instruction and training guide

    NASA Technical Reports Server (NTRS)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1994-01-01

    This guide instructs users in the operation of a Proximity Operations Planning System. This system uses an interactive graphical method for planning fuel-efficient rendezvous trajectories in the multi-spacecraft environment of the space station and allows the operator to compose a multi-burn transfer trajectory between orbit initial chaser and target trajectories. The available task time (window) of the mission is predetermined and the maneuver is subject to various operational constraints, such as departure, arrival, spatial, plume impingement, and en route passage constraints. The maneuvers are described in terms of the relative motion experienced in a space station centered coordinate system. Both in-orbital plane as well as out-of-orbital plane maneuvering is considered. A number of visual optimization aids are used for assisting the operator in reaching fuel-efficient solutions. These optimization aids are based on the Primer Vector theory. The visual feedback of trajectory shapes, operational constraints, and optimization functions, provided by user-transparent and continuously active background computations, allows the operator to make fast, iterative design changes that rapidly converge to fuel-efficient solutions. The planning tool is an example of operator-assisted optimization of nonlinear cost functions.

  4. Political and legal implications of developing and operating a satellite power system

    NASA Technical Reports Server (NTRS)

    Hazelrigg, G. A., Jr.

    1977-01-01

    A number of political and legal implications of developing and operating a satellite power system (SPS) are identified and studied in this report. These include the vulnerability of SPS to actions of adversaries, communications impacts, the legality of an SPS in orbit including on-orbit military protection, alleviation of political concerns about deployment and operation of SPS, programmatic planning for SPS and the interaction of SPS with federal regulatory agencies and major departments. In comparing SPS to terrestrial power stations, it is seen that the political problems are neither clearly larger nor clearly smaller--they are clearly different and they are international in nature. If SPS is to become a reality these problems must be dealt with. Five major issues are identified. These must be resolved in order to obtain international acceptance of SPS. However, this study has found no insurmountable obstacles that would clearly prohibit the deployment, operation and protection of an SPS fleet.

  5. Forecasting the Economic Impact of Future Space Station Operations

    NASA Technical Reports Server (NTRS)

    Summer, R. A.; Smolensky, S. M.; Muir, A. H.

    1967-01-01

    Recent manned and unmanned Earth-orbital operations have suggested great promise of improved knowledge and of substantial economic and associated benefits to be derived from services offered by a space station. Proposed application areas include agriculture, forestry, hydrology, public health, oceanography, natural disaster warning, and search/rescue operations. The need for reliable estimates of economic and related Earth-oriented benefits to be realized from Earth-orbital operations is discussed and recent work in this area is reviewed. Emphasis is given to those services based on remote sensing. Requirements for a uniform, comprehensive and flexible methodology are discussed. A brief review of the suggested methodology is presented. This methodology will be exercised through five case studies which were chosen from a gross inventory of almost 400 user candidates. The relationship of case study results to benefits in broader application areas is discussed, Some management implications of possible future program implementation are included.

  6. A white paper: Operational efficiency. New approaches to future propulsion systems

    NASA Technical Reports Server (NTRS)

    Rhodes, Russel; Wong, George

    1991-01-01

    Advanced launch systems for the next generation of space transportation systems (1995 to 2010) must deliver large payloads (125,000 to 500,000 lbs) to low earth orbit (LEO) at one tenth of today's cost, or 300 to 400 $/lb of payload. This cost represents an order of magnitude reduction from the Titan unmanned vehicle cost of delivering payload to orbit. To achieve this sizable reduction, the operations cost as well as the engine cost must both be lower than current engine system. The Advanced Launch System (ALS) is studying advanced engine designs, such as the Space Transportation Main Engine (STME), which has achieved notable reduction in cost. The results are presented of a current study wherein another level of cost reduction can be achieved by designing the propulsion module utilizing these advanced engines for enhanced operations efficiency and reduced operations cost.

  7. On-Orbit Checkout and Activation of the ISS Oxygen Generation System

    NASA Technical Reports Server (NTRS)

    Bagdigian, Robert M.; Prokhorov, Kimberlee S.

    2007-01-01

    NASA has developed and; deployed an Oxygen Generation System (OGS) into the Destiny Module of the International Space Station (ISS). The major. assembly; included in this system is the Oxygen Generator Assembly. (OGA) which was developed under NASA contract by Hamilton Sundstrand Space Systems International (HSSSI), Inc. This paper summarizes the installation of the system into the Destiny Module, its initial checkout and periodic preventative maintenance activities, and its operational activation. Trade studies and analyses that were conducted with the goal of mitigating on-orbit operational risks are also discussed.

  8. Conceptual designs study for a Personnel Launch System (PLS)

    NASA Technical Reports Server (NTRS)

    Wetzel, E. D.

    1990-01-01

    A series of conceptual designs for a manned, Earth to Low Earth Orbit transportation system was developed. Non-winged, low L/D vehicle shapes are discussed. System and subsystem trades emphasized safety, operability, and affordability using near-term technology. The resultant conceptual design includes lessons learned from commercial aviation that result in a safe, routine, operationally efficient system. The primary mission for this Personnel Launch System (PLS) would be crew rotation to the SSF; other missions, including satellite servicing, orbital sortie, and space rescue were also explored.

  9. Mission Success and Environmental Protection: Orbital Debris Considerations

    NASA Technical Reports Server (NTRS)

    Johnson, Nicholas

    2007-01-01

    The current U.S. National Space Policy specifically calls on U.S. Government entities "to follow the United States Government Orbital Debris Mitigation Standard Practices, consistent with mission requirements and cost effectiveness, in the procurement and operation of spacecraft, launch services, and the operation of tests and experiments in space. Early assessment (pre-PDR) of orbital debris mitigation compliance is essential to minimize development impacts. Orbital debris mitigation practices today are the most effective means to protect the near-Earth space environment for future missions.

  10. Operator Station Design System - A computer aided design approach to work station layout

    NASA Technical Reports Server (NTRS)

    Lewis, J. L.

    1979-01-01

    The Operator Station Design System is resident in NASA's Johnson Space Center Spacecraft Design Division Performance Laboratory. It includes stand-alone minicomputer hardware and Panel Layout Automated Interactive Design and Crew Station Assessment of Reach software. The data base consists of the Shuttle Transportation System Orbiter Crew Compartment (in part), the Orbiter payload bay and remote manipulator (in part), and various anthropometric populations. The system is utilized to provide panel layouts, assess reach and vision, determine interference and fit problems early in the design phase, study design applications as a function of anthropometric and mission requirements, and to accomplish conceptual design to support advanced study efforts.

  11. Potential Operating Orbits for Fission Electric Propulsion Systems Driven by the SAFE-400

    NASA Technical Reports Server (NTRS)

    Houts, Mike; Kos, Larry; Poston, David; Rodgers, Stephen L. (Technical Monitor)

    2002-01-01

    Safety must be ensured during all phases of space fission system design, development, fabrication, launch, operation, and shutdown. One potential space fission system application is fission electric propulsion (FEP), in which fission energy is converted into electricity and used to power high efficiency (Isp greater than 3000s) electric thrusters. For these types of systems it is important to determine which operational scenarios ensure safety while allowing maximum mission performance and flexibility. Space fission systems are essentially nonradioactive at launch, prior to extended operation at high power. Once high power operation begins, system radiological inventory steadily increases as fission products build up. For a given fission product isotope, the maximum radiological inventory is typically achieved once the system has operated for a length of time equivalent to several half-lives. After that time, the isotope decays at the same rate it is produced, and no further inventory builds in. For an FEP mission beginning in Earth orbit, altitude and orbital lifetime increase as the propulsion system operates. Two simultaneous effects of fission propulsion system operation are thus (1) increasing fission product inventory and (2) increasing orbital lifetime. Phrased differently, as fission products build up, more time is required for the fission products to naturally convert back into non-radioactive isotopes. Simultaneously, as fission products build up, orbital lifetime increases, providing more time for the fission products to naturally convert back into non-radioactive isotopes. Operational constraints required to ensure safety can thus be quantified.

  12. Potential operating orbits for fission electric propulsion systems driven by the SAFE-400

    NASA Astrophysics Data System (ADS)

    Houts, Mike; Kos, Larry; Poston, David

    2002-01-01

    Safety must be ensured during all phases of space fission system design, development, fabrication, launch, operation, and shutdown. One potential space fission system application is fission electric propulsion (FEP), in which fission energy is converted into electricity and used to power high efficiency (Isp>3000s) electric thrusters. For these types of systems it is important to determine which operational scenarios ensure safety while allowing maximum mission performance and flexibility. Space fission systems are essentially non-radioactive at launch, prior to extended operation at high power. Once high power operation begins, system radiological inventory steadily increases as fission products build up. For a given fission product isotope, the maximum radiological inventory is typically achieved once the system has operated for a length of time equivalent to several half-lives. After that time, the isotope decays at the same rate it is produced, and no further inventory builds in. For an FEP mission beginning in Earth orbit, altitude and orbital lifetime increase as the propulsion system operates. Two simultaneous effects of fission propulsion system operation are thus (1) increasing fission product inventory and (2) increasing orbital lifetime. Phrased differently, as fission products build up, more time is required for the fission products to naturally convert back into non-radioactive isotopes. Simultaneously, as fission products build up, orbital lifetime increases, providing more time for the fission products to naturally convert back into non-radioactive isotopes. Operational constraints required to ensure safety can thus be quantified. .

  13. A definition study of the on-orbit assembly operations for the outboard photovoltaic power modules for Space Station Freedom. M.S. Thesis - Toledo Univ.

    NASA Technical Reports Server (NTRS)

    Sours, Thomas J.

    1989-01-01

    A concept is described for the assembly of the outboard PV modules for Space Station Freedom. Analysis of the on-orbit assembly operations was performed using CADAM design graphics software. A scenario for assembly using the various assembly equipment, as currently defined, is described in words, tables and illustrations. This work is part of ongoing studies in the area of space station assembly. The outboard PV module and the assembly equipment programs are all in definition and preliminary design phases. An input is provided to the design process of assembly equipment programs. It is established that the outboard PV module assembly operations can be performed using the assembly equipment currently planned in the Space Station Freedom Program.

  14. Development and Execution of End-of-Mission Operations Case Study of the UARS and ERBS End-of-Mission Plans

    NASA Technical Reports Server (NTRS)

    Hughes, John; Marius, Julio L.; Montoro, Manuel; Patel, Mehul; Bludworth, David

    2006-01-01

    This Paper is a case study of the development and execution of the End-of-Mission plans for the Earth Radiation Budget Satellite (ERBS) and the Upper Atmosphere Research Satellite (UARS). The goals of the End-of-Mission Plans are to minimize the time the spacecraft remains on orbit and to minimize the risk of creating orbital debris. Both of these Missions predate the NASA Management Instructions (NMI) that directs missions to provide for safe mission termination. Each spacecrafts had their own unique challenges, which required assessing End-of-Mission requirements versus spacecraft limitations. Ultimately the End-of- Mission operations were about risk mitigation. This paper will describe the operational challenges and the lessons learned executing these End-of-Mission Plans

  15. On-Orbit Constraints Test - Performing Pre-Flight Tests with Flight Hardware, Astronauts and Ground Support Equipment to Assure On-Orbit Success

    NASA Technical Reports Server (NTRS)

    Haddad, Michael E.

    2008-01-01

    On-Orbit Constraints Test (OOCT's) refers to mating flight hardware together on the ground before they will be mated on-orbit. The concept seems simple but it can be difficult to perform operations like this on the ground when the flight hardware is being designed to be mated on-orbit in a zero-g and/or vacuum environment of space. Also some of the items are manufactured years apart so how are mating tasks performed on these components if one piece is on-orbit before its mating piece is planned to be built. Both the Internal Vehicular Activity (IVA) and Extra-Vehicular Activity (EVA) OOCT's performed at Kennedy Space Center will be presented in this paper. Details include how OOCT's should mimic on-orbit operational scenarios, a series of photographs will be shown that were taken during OOCT's performed on International Space Station (ISS) flight elements, lessons learned as a result of the OOCT's will be presented and the paper will conclude with possible applications to Moon and Mars Surface operations planned for the Constellation Program.

  16. Chandra X-Ray Observatory Pointing Control System Performance During Transfer Orbit and Initial On-Orbit Operations

    NASA Technical Reports Server (NTRS)

    Quast, Peter; Tung, Frank; West, Mark; Wider, John

    2000-01-01

    The Chandra X-ray Observatory (CXO, formerly AXAF) is the third of the four NASA great observatories. It was launched from Kennedy Space Flight Center on 23 July 1999 aboard the Space Shuttle Columbia and was successfully inserted in a 330 x 72,000 km orbit by the Inertial Upper Stage (IUS). Through a series of five Integral Propulsion System burns, CXO was placed in a 10,000 x 139,000 km orbit. After initial on-orbit checkout, Chandra's first light images were unveiled to the public on 26 August, 1999. The CXO Pointing Control and Aspect Determination (PCAD) subsystem is designed to perform attitude control and determination functions in support of transfer orbit operations and on-orbit science mission. After a brief description of the PCAD subsystem, the paper highlights the PCAD activities during the transfer orbit and initial on-orbit operations. These activities include: CXO/IUS separation, attitude and gyro bias estimation with earth sensor and sun sensor, attitude control and disturbance torque estimation for delta-v burns, momentum build-up due to gravity gradient and solar pressure, momentum unloading with thrusters, attitude initialization with star measurements, gyro alignment calibration, maneuvering and transition to normal pointing, and PCAD pointing and stability performance.

  17. Flowmeter evaluation for on-orbit operations

    NASA Technical Reports Server (NTRS)

    Baird, R. S.

    1988-01-01

    Various flowmetering concepts were flow tested to characterize the relative capabilities and limitations for on-orbit fluid-transfer operations. Performance results and basic operating principles of each flowmetering concept tested are summarized, and basic considerations required to select the best flowmeter(s) for fluid system application are discussed. Concepts tested were clamp-on ultrasonic, area averaging ultrasonic, offset ultrasonic, coriolis mass, vortex shedding, universal venturi tube, turbine, bearingless turbine, turbine/turbine differential-pressure hybrid, dragbody, and dragbody/turbine hybrid flowmeters. Fluid system flowmeter selection considerations discussed are flowmeter performance, fluid operating conditions, systems operating environments, flowmeter packaging, flowmeter maintenance, and flowmeter technology. No one flowmetering concept tested was shown to be best for all on-orbit fluid systems.

  18. Changes of Space Debris Orbits After LDR Operation

    NASA Astrophysics Data System (ADS)

    Wnuk, E.; Golebiewska, J.; Jacquelard, C.; Haag, H.

    2013-09-01

    A lot of technical studies are currently developing concepts of active removal of space debris to protect space assets from on orbit collision. For small objects, such concepts include the use of ground-based lasers to remove or reduce the momentum of the objects thereby lowering their orbit in order to facilitate their decay by re-entry into the Earth's atmosphere. The concept of the Laser Debris Removal (LDR) system is the main subject of the CLEANSPACE project. One of the CLEANSPACE objectives is to define a global architecture (including surveillance, identification and tracking) for an innovative ground-based laser solution, which can remove hazardous medium debris around selected space assets. The CLEANSPACE project is realized by a European consortium in the frame of the European Commission Seventh Framework Programme (FP7), Space topic. The use of sequence of laser operations to remove space debris, needs very precise predictions of future space debris orbital positions, on a level even better than 1 meter. Orbit determination, tracking (radar, optical and laser) and orbit prediction have to be performed with accuracy much better than so far. For that, the applied prediction tools have to take into account all perturbation factors that influence object orbit. The expected object's trajectory after the LDR operation is a lowering of its perigee. To prevent the debris with this new trajectory to collide with another object, a precise trajectory prediction after the LDR sequence is therefore the main task allowing also to estimate re-entry parameters. The LDR laser pulses change the debris object velocity v. The future orbit and re-entry parameters of the space debris after the LDR engagement can be calculated if the resulting ?v vector is known with the sufficient accuracy. The value of the ?v may be estimated from the parameters of the LDR station and from the characteristics of the orbital debris. However, usually due to the poor knowledge of the debris object's size, mass, spin and chemical composition the value and the direction of the vector ?v cannot be estimated with the high accuracy. Therefore, a high precise tracking of the debris will be necessary immediately before the engagement of the LDR and also during this engagement. By extending this tracking and ranging for a few seconds after engagement, the necessary data to evaluate the orbital modification can be produced in the same way as it is done for the catalogue generation. In our paper we discuss the object's orbit changes due to LDR operation for different locations of LDR station and different parameters of the laser energy and telescope diameter. We estimate the future orbit and re-entry parameters taking into account the influence of all important perturbation factors on the space debris orbital motion after LDR.

  19. Selected tether applications in space: An analysis of five selected concepts

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Ground rules and assumptions; operations; orbit considerations/dynamics; tether system design and dynamics; functional requirements; hardware concepts; and safety factors are examined for five scenarios: tethered effected separation of an Earth bound shuttle from the space station; tether effected orbit boost of a spacecraft (AXAF) into its operational orbit from the shuttle; an operational science/technology platform tether deployed from space station; a tether mediated rendezvous involving an OMV tether deployed from space station to rendezvous with an aerobraked OTV returning to geosynchronous orbit from a payload delivery mission; and an electrodynamic tether used in a dual motor/generator mode to serve as the primary energy storage facility for space station.

  20. Orbiter integrated active thermal control subsystem test

    NASA Technical Reports Server (NTRS)

    Jaax, J. R.

    1980-01-01

    Integrated subsystem level testing of the systems within the orbiter active thermal chamber capable of simulating ground, orbital, and entry temperature and pressure profiles. The test article was in a closed loop configuration that included flight type and functionally simulated protions of all ATCS components for collecting, transporting, and rejecting orbiter waste heat. Specially designed independently operating equipment simulated the transient thermal input from the cabin, payload, fuel cells, freon cold plates, hydraulic system, and space environment. Test team members using data, controls, and procedures available to a flight crew controlled the operation of the ATCS. The ATCS performance met or exceeded all thermal and operational requirements for planned and contingency mission support.

  1. Space tug/shuttle interface compatibility study. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Shuttle interfaces required for space tug accommodation are primarily involved with supporting and servicing the tug during launch countdown, flight, and postlanding; deploying and retrieving the tug on orbit; and maintaining control over the tug when it is in or near the orbiter. Each of these interface areas was investigated to determine the best physical and operational method of accomplishing the required functions, with an overriding goal of establishing simple and flexible orbiter interface requirements suitable for tug, tug payloads, IUS and other cargo. It is concluded the orbiter payload accommodations and the MSFC baseline tug are generally interface compatible. Specific minor changes to tug and orbiter interfaces were identified to provide full compatibility. A system concept for supporting and deploying tug from orbiter is described.

  2. WARC and CCIR support for spectrum-orbit planning

    NASA Technical Reports Server (NTRS)

    Sawitz, P. H.

    1980-01-01

    Papers prepared for the use of the U.S. delegation to the 1979 World Administrative Radio Conference; papers contributed to the National CCIR study groups on broadcasting satellites and spectrum-orbit utilization; responses to specific requests for technical analyses and evaluations; and papers presented at technical conferences on related topics are presented. Nonlinear optimization methods for finding optimum positions of satellites in the fixed satellite service; the effects of geography on the use of the geostationary orbit; intercontinental orbit sharing; traffic coordination in interfering satellites operating in the fixed satellite service; and domestic fixed and broadcasting satellite systems are covered. A possible channel orbit plan for broadcasting satellite service in the U.S. and Canada; polarization for broadcasting satellite systems; and the communication capacity of the geostationary satellite orbit are also examined.

  3. Vulnerability of manned spacecraft to crew loss from orbital debris penetration

    NASA Technical Reports Server (NTRS)

    Williamsen, J. E.

    1994-01-01

    Orbital debris growth threatens the survival of spacecraft systems from impact-induced failures. Whereas the probability of debris impact and spacecraft penetration may currently be calculated, another parameter of great interest to safety engineers is the probability that debris penetration will cause actual spacecraft or crew loss. Quantifying the likelihood of crew loss following a penetration allows spacecraft designers to identify those design features and crew operational protocols that offer the highest improvement in crew safety for available resources. Within this study, a manned spacecraft crew survivability (MSCSurv) computer model is developed that quantifies the conditional probability of losing one or more crew members, P(sub loss/pen), following the remote likelihood of an orbital debris penetration into an eight module space station. Contributions to P(sub loss/pen) are quantified from three significant penetration-induced hazards: pressure wall rupture (explosive decompression), fragment-induced injury, and 'slow' depressurization. Sensitivity analyses are performed using alternate assumptions for hazard-generating functions, crew vulnerability thresholds, and selected spacecraft design and crew operations parameters. These results are then used to recommend modifications to the spacecraft design and expected crew operations that quantitatively increase crew safety from orbital debris impacts.

  4. Conjunction Assessment for Commercial Satellite Constellations Using Commercial Radar Data Sources

    NASA Astrophysics Data System (ADS)

    Nicolls, M.; Vittaldev, V.; Ceperley, D.; Creus-Costa, J.; Foster, C.; Griffith, N.; Lu, E.; Mason, J.; Park, I.; Rosner, C.; Stepan, L.

    For companies with multiple orbital assets, managing the risk of collision with other low-Earth orbit (LEO) Resident Space Objects (RSOs) can amount to a significant operational burden. LeoLabs and Planet investigate the impact of a workflow that integrates commercial Space Situational Awareness (SSA) data into conjunction assessments for large satellite constellations. Radar measurements from LeoLabs are validated against truth orbits provided by the International Laser Ranging Service (ILRS) and to measurements from Planet’s on-board GPS instrumentation. The radar data is then used as input for orbit fits in order to form the basis of a conjunction assessment. To confirm the reliability of the orbit determination (OD), the generated ephemerides are validated against ILRS and GPS-derived orbits. In addition, a covariance realism assessment is performed in order to check for self-consistency by comparing the propagated orbit and the associated covariance against later measurements. Several cases are investigated to assess the benefits of integrating radar-derived products with Conjunction Data Messages (CDMs) received on Planet spacecraft. Conjunction assessment is refined using onboard GPS measurements from Planet satellites along with tracking measurements of the secondary RSO by LeoLabs. This study demonstrates that commercial data provided by LeoLabs is reliable, accurate, and timely, and that ephemeris generated from LeoLabs data provides solutions and insights which are consistent with those provided in CDMs. For the cases analyzed, the addition of commercial SSA data from LeoLabs has a positive impact on operations due to the additional information on the state of the secondary RSO which can lead to increased confidence in any maneuver-related decisions. Measurements from LeoLabs can also be used to improve conjunction assessment for commercial satellites that do not have any operator OD.

  5. Joint Europa Mission (JEM) : A multi-scale study of Europa to characterize its habitability and search for life.

    NASA Astrophysics Data System (ADS)

    Blanc, Michel; Prieto Ballesteros, Olga; Andre, Nicolas; Cooper, John F.

    2017-04-01

    Europa is the closest and probably the most promising target to perform a comprehensive characterization of habitability and search for extant life. We propose that NASA and ESA join forces to design an ambitious planetary mission we call JEM (for Joint Europa Mission) to reach this objective. JEM will be assigned the following overarching goal: Understand Europa as a complex system responding to Jupiter system forcing, characterize the habitability of its potential biosphere, and search for life in its surface, sub-surface and exosphere. Our observation strategy to address these goals will combine three scientific measurement sequences: measurements on a high-latitude, low-latitude Europan orbit providing a continuous and global mapping of planetary fields (magnetic and gravity) and of the neutral and charged environment during a period of three months; in-situ measurements at the surface, using a soft lander operating during 35 days, to search for bio-signatures at the surface and sub-surface and operate a geophysical station; measurements of the chemical composition of the very low exosphere and plumes in search for biomolecules. The implementation of these three observation sequences will rest on the combination of two science platforms equipped with the most advanced instrumentation: a soft lander to perform all scientific measurements at the surface and sub-surface at a selected landing site, and a carrier/relay/orbiter to perform the orbital survey and descent sequences. In this concept, the orbiter will perform science operations during the relay phase on a carefully optimized halo orbit of the Europa-Jupiter system before moving to its final Europan orbit. The design of both orbiter and lander instruments will have to accommodate the very challenging radiation mitigation and Planetary Protection issues. The proposed lander science platform is composed of a geophysical station and of two complementary astrobiology facilities dedicated to bio-signature characterization experiments operating respectively in the solid and in the liquid phases, fed by a common articulated arm. The "Astrobiology Wet Laboratory" will be a specific European contribution. We propose an innovative distribution of roles to make JEM an appealing and affordable joint venture for the two agencies: while NASA would provide an SLS launcher, the lander stack and mission operations, ESA would provide the carrier-orbiter-relay platform. The delivery of the orbiter by ESA could take advantage of a double European heritage: an adaptation of the ORION ESM bus to JEM, complemented by avionics derived from JUICE.

  6. Low-speed longitudinal orbiter qualities

    NASA Technical Reports Server (NTRS)

    Powers, B. G.

    1985-01-01

    The shuttle program took on the challenge of providing a manual landing capability for an operational vehicle returning from orbit. Some complex challenges were encountered in developing the longitudinal flying qualities required to land the orbiter manually in an operational environment. Approach and landing test flights indicated a tendency for pilot-induced oscillation near landing. Changes in the operational procedures reduced the difficulty of the landing task, and an adaptive stick filter was incorporated to reduce the severity of any pilot-induced oscillatory motions. Fixed-base, movingbase, and in-flight simulations were used for the evaluations, and in general, flight simulation was the only reliable means of assessing the low-speed longitudinal flying qualities problems. Overall, the orbiter control system and operational procedures have produced a good capability to routinely perform precise landings with a large, unpowered vehicle with a low lift-to-drag ratio.

  7. Effects of Orbital Lifetime Reduction on the Long-Term Earth Satellite Population as Modeled by EVOLVE 4.0

    NASA Technical Reports Server (NTRS)

    Krisko, Paula H.; Opiela, John N.; Liou, Jer-Chyi; Anz-Meador, Phillip D.; Theall, Jeffrey R.

    1999-01-01

    The latest update of the NASA orbital debris environment model, EVOLVE 4.0, has been used to study the effect of various proposed debris mitigation measures, including the NASA 25-year guideline. EVOLVE 4.0, which includes updates of the NASA breakup, solar activity, and the orbit propagator models, a GEO analysis option, and non-fragmentation debris source models, allows for the statistical modeling and predicted growth of the particle population >1 mm in characteristic length in LEO and GEO orbits. The initial implementation of this &odel has been to study the sensitivity of the overall LEO debris environment to mitigation measures designed to limit the lifetime of intact objects in LEO orbits. The mitigation measures test matrix for this study included several commonly accepted testing schemes, i.e., the variance of the maximum LEO lifetime from 10 to 50 years, the date of the initial implementation of this policy, the shut off of all explosions at some specified date, and the inclusion of disposal orbits. All are timely studies in that all scenarios have been suggested by researchers and satellite operators as options for the removal of debris from LEO orbits.

  8. Results from teleoperated free-flying spacecraft simulations in the Martin Marietta space operations simulator lab

    NASA Technical Reports Server (NTRS)

    Hartley, Craig S.

    1990-01-01

    To augment the capabilities of the Space Transportation System, NASA has funded studies and developed programs aimed at developing reusable, remotely piloted spacecraft and satellite servicing systems capable of delivering, retrieving, and servicing payloads at altitudes and inclinations beyond the reach of the present Shuttle Orbiters. Since the mid 1970's, researchers at the Martin Marietta Astronautics Group Space Operations Simulation (SOS) Laboratory have been engaged in investigations of remotely piloted and supervised autonomous spacecraft operations. These investigations were based on high fidelity, real-time simulations and have covered a wide range of human factors issues related to controllability. Among these are: (1) mission conditions, including thruster plume impingements and signal time delays; (2) vehicle performance variables, including control authority, control harmony, minimum impulse, and cross coupling of accelerations; (3) maneuvering task requirements such as target distance and dynamics; (4) control parameters including various control modes and rate/displacement deadbands; and (5) display parameters involving camera placement and function, visual aids, and presentation of operational feedback from the spacecraft. This presentation includes a brief description of the capabilities of the SOS Lab to simulate real-time free-flyer operations using live video, advanced technology ground and on-orbit workstations, and sophisticated computer models of on-orbit spacecraft behavior. Sample results from human factors studies in the five categories cited above are provided.

  9. Effectiveness of a Novel Augmented Reality-Based Navigation System in Treatment of Orbital Hypertelorism.

    PubMed

    Zhu, Ming; Chai, Gang; Lin, Li; Xin, Yu; Tan, Andy; Bogari, Melia; Zhang, Yan; Li, Qingfeng

    2016-12-01

    Augmented reality (AR) technology can superimpose the virtual image generated by computer onto the real operating field to present an integral image to enhance surgical safety. The purpose of our study is to develop a novel AR-based navigation system for craniofacial surgery. We focus on orbital hypertelorism correction, because the surgery requires high preciseness and is considered tough even for senior craniofacial surgeon. Twelve patients with orbital hypertelorism were selected. The preoperative computed tomography data were imported into 3-dimensional platform for preoperational design. The position and orientation of virtual information and real world were adjusted by image registration process. The AR toolkits were used to realize the integral image. Afterward, computed tomography was also performed after operation for comparing the difference between preoperational plan and actual operational outcome. Our AR-based navigation system was successfully used in these patients, directly displaying 3-dimensional navigational information onto the surgical field. They all achieved a better appearance by the guidance of navigation image. The difference in interdacryon distance and the dacryon point of each side appear no significant (P > 0.05) between preoperational plan and actual surgical outcome. This study reports on an effective visualized approach for guiding orbital hypertelorism correction. Our AR-based navigation system may lay a foundation for craniofacial surgery navigation. The AR technology could be considered as a helpful tool for precise osteotomy in craniofacial surgery.

  10. Launch Vehicle Production and Operations Cost Metrics

    NASA Technical Reports Server (NTRS)

    Watson, Michael D.; Neeley, James R.; Blackburn, Ruby F.

    2014-01-01

    Traditionally, launch vehicle cost has been evaluated based on $/Kg to orbit. This metric is calculated based on assumptions not typically met by a specific mission. These assumptions include the specified orbit whether Low Earth Orbit (LEO), Geostationary Earth Orbit (GEO), or both. The metric also assumes the payload utilizes the full lift mass of the launch vehicle, which is rarely true even with secondary payloads.1,2,3 Other approaches for cost metrics have been evaluated including unit cost of the launch vehicle and an approach to consider the full program production and operations costs.4 Unit cost considers the variable cost of the vehicle and the definition of variable costs are discussed. The full program production and operation costs include both the variable costs and the manufacturing base. This metric also distinguishes operations costs from production costs, including pre-flight operational testing. Operations costs also consider the costs of flight operations, including control center operation and maintenance. Each of these 3 cost metrics show different sensitivities to various aspects of launch vehicle cost drivers. The comparison of these metrics provides the strengths and weaknesses of each yielding an assessment useful for cost metric selection for launch vehicle programs.

  11. Precise orbit determination using the batch filter based on particle filtering with genetic resampling approach

    NASA Astrophysics Data System (ADS)

    Kim, Young-Rok; Park, Eunseo; Choi, Eun-Jung; Park, Sang-Young; Park, Chandeok; Lim, Hyung-Chul

    2014-09-01

    In this study, genetic resampling (GRS) approach is utilized for precise orbit determination (POD) using the batch filter based on particle filtering (PF). Two genetic operations, which are arithmetic crossover and residual mutation, are used for GRS of the batch filter based on PF (PF batch filter). For POD, Laser-ranging Precise Orbit Determination System (LPODS) and satellite laser ranging (SLR) observations of the CHAMP satellite are used. Monte Carlo trials for POD are performed by one hundred times. The characteristics of the POD results by PF batch filter with GRS are compared with those of a PF batch filter with minimum residual resampling (MRRS). The post-fit residual, 3D error by external orbit comparison, and POD repeatability are analyzed for orbit quality assessments. The POD results are externally checked by NASA JPL’s orbits using totally different software, measurements, and techniques. For post-fit residuals and 3D errors, both MRRS and GRS give accurate estimation results whose mean root mean square (RMS) values are at a level of 5 cm and 10-13 cm, respectively. The mean radial orbit errors of both methods are at a level of 5 cm. For POD repeatability represented as the standard deviations of post-fit residuals and 3D errors by repetitive PODs, however, GRS yields 25% and 13% more robust estimation results than MRRS for post-fit residual and 3D error, respectively. This study shows that PF batch filter with GRS approach using genetic operations is superior to PF batch filter with MRRS in terms of robustness in POD with SLR observations.

  12. Satellite services system analysis study. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Service requirements are considered. Topics include development of on-orbit operations scenarios, service equipment summary, crew interaction, and satellite features facilitating servicing. Service equipment concepts are considered. Topics include payload deployment, close proximity retrieval, on-orbit servicing, backup/contingency, delivery/retrieval of high energy payloads, Earth return, optional service, and advanced capabilities. Program requirements are assessed.

  13. Crew appliance concepts. Volume 2, appendix B: Shuttle orbiter appliances supporting engineering data. [food management and personal hygiene

    NASA Technical Reports Server (NTRS)

    Proctor, B. W.; Reysa, R. P.; Russell, D. J.

    1975-01-01

    Technical data collected for the food management and personal hygiene appliances considered for the shuttle orbiter are presented as well as plotted and tabulated trade study results for each appliance. Food storage, food operation, galley cleanup, waste collection/transfer, body cleansing, and personal grooming were analyzed.

  14. Centaur operations at the space station

    NASA Technical Reports Server (NTRS)

    Porter, J.; Thompson, W.; Bennett, F.; Holdridge, J.

    1987-01-01

    A study was conducted on the feasibility of using a Centaur vehicle as a testbed to demonstrate critical OTV technologies at the Space Station. Two Technology Demonstration Missions (TDMs) were identified: (1) Accommodations, and (2) Operations. The Accommodations TDM contained: (1) berthing, (2) checkout, maintenance and safing, and (3) payload integration missions. The Operations TDM contained: (1) a cryogenic propellant resupply mission, and (2) Centaur deployment activities. A modified Space Station Co-Orbiting Platform (COP) was selected as the optimum refueling and launch node due to safety and operational considerations. After completion of the TDMs, the fueled Centaur would carry out a mission to actually test deployment and help offset TDM costs. From the Station, the Centaur could carry a single payload in excess of 20,000 pounds to geosynchronous orbit or multiple payloads.

  15. The Cassini-Huygens Mission Overview

    NASA Technical Reports Server (NTRS)

    Vandermey, Nancy; Paczkowski, Brian G.

    2006-01-01

    The Cassini-Huygens Program is an international science mission to the Saturnian system. Three space agencies and seventeen nations contributed to building the Cassini spacecraft and Huygens probe. The Cassini orbiter is managed and operated by NASA's Jet Propulsion Laboratory. The Huygens probe was built and operated by the European Space Agency. The mission design for Cassini-Huygens calls for a four-year orbital survey of Saturn, its rings, magnetosphere, and satellites, and the descent into Titan's atmosphere of the Huygens probe. The Cassini orbiter tour consists of 76 orbits around Saturn with 45 close Titan flybys and 8 targeted icy satellite flybys. The Cassini orbiter spacecraft carries twelve scientific instruments that are performing a wide range of observations on a multitude of designated targets. The Huygens probe carried six additional instruments that provided in-situ sampling of the atmosphere and surface of Titan. The multi-national nature of this mission poses significant challenges in the area of flight operations. This paper will provide an overview of the mission, spacecraft, organization and flight operations environment used for the Cassini-Huygens Mission. It will address the operational complexities of the spacecraft and the science instruments and the approach used by Cassini-Huygens to address these issues.

  16. Early Results from Solar Dynamic Space Power System Testing

    NASA Technical Reports Server (NTRS)

    Shaltens, Richard K.; Mason, Lee S.

    1996-01-01

    A government/industry team designed, built and tested a 2-kWe solar dynamic space power system in a large thermal vacuum facility with a simulated Sun at the NASA Lewis Research Center. The Lewis facility provides an accurate simulation of temperatures, high vacuum and solar flux as encountered in low-Earth orbit. The solar dynamic system includes a Brayton power conversion unit integrated with a solar receiver which is designed to store energy for continuous power operation during the eclipse phase of the orbit. This paper reviews the goals and status of the Solar Dynamic Ground Test Demonstration project and describes the initial testing, including both operational and performance data. System testing to date has accumulated over 365 hours of power operation (ranging from 400 watts to 2.0-W(sub e)), including 187 simulated orbits, 16 ambient starts and 2 hot restarts. Data are shown for an orbital startup, transient and steady-state orbital operation and shutdown. System testing with varying insolation levels and operating speeds is discussed. The solar dynamic ground test demonstration is providing the experience and confidence toward a successful flight demonstration of the solar dynamic technologies on the Space Station Mir in 1997.

  17. Ohio Senator John Glenn tours the orbiter Columbia's middeck

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Astronaut Stephen Oswald, at left, explains Shuttle operations to Ohio Senator John Glenn on the orbiter Columbia's middeck at the Orbiter Processing Facility 3 at Kennedy Space Center. Senator Glenn arrived at KSC on Jan. 20 to tour KSC operational areas and to view the launch of STS-89 later this week. Glenn, who made history in 1962 as the first American to orbit the Earth, completing three orbits in a five-hour flight aboard Friendship 7, will fly his second space mission aboard Space Shuttle Discovery this October. Glenn is retiring from the Senate at the end of this year and will be a payload specialist aboard STS-95.

  18. Ohio Senator John Glenn tours the orbiter Columbia's middeck

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Astronaut Stephen Oswald, at right, explains Shuttle operations to Ohio Senator John Glenn on the orbiter Columbia's middeck at the Orbiter Processing Facility 3 at Kennedy Space Center. Senator Glenn arrived at KSC on Jan. 20 to tour KSC operational areas and to view the launch of STS-89 later this week. Glenn, who made history in 1962 as the first American to orbit the Earth, completing three orbits in a five-hour flight aboard Friendship 7, will fly his second space mission aboard Space Shuttle Discovery this October. Glenn is retiring from the Senate at the end of this year and will be a payload specialist aboard STS-95.

  19. ARTEMIS Mission Overview: From Concept to Operations

    NASA Technical Reports Server (NTRS)

    Folta, David; Sweetser, Theodore

    2011-01-01

    ARTEMIS (Acceleration, Reconnection, Turbulence and Electrodynamics of the Moon's Interaction with the Sun) repurposed two spacecraft to extend their useful science (Angelopoulos, 2010) by moving them via lunar gravity assists from elliptical Earth orbits to L1 and L2 Earth-Moon libration orbits and then to lunar orbits by exploiting the Earth-Moon-Sun dynamical environment. This paper describes the complete design from conceptual plans using weak stability transfer options and lunar gravity assist to the implementation and operational support of the Earth-Moon libration and lunar orbits. The two spacecraft of the ARTEMIS mission will have just entered lunar orbit at this paper's presentation.

  20. PC-402 Pioneer Venus orbiter spacecraft mission operational characteristics document

    NASA Technical Reports Server (NTRS)

    Barker, F. C.; Butterworth, L. W.; Daniel, R. E.; Drean, R. J.; Filetti, K. A.; Fisher, J. N.; Nowak, L. A.; Porzucki, J.; Salvatore, J. O.; Tadler, G. A.

    1978-01-01

    The operational characteristics of the Orbiter spacecraft and its subsystems are described. In extensive detail. Description of the nominal phases, system interfaces, and the capabilities and limitations of system level performance are included along with functional and operational descriptions at the subsystem and unit level the subtleties of nominal operation as well as detailed capabilities and limitations beyond nominal performance are discussed. A command and telemetry logic flow diagram for each subsystem is included. Each diagram encountered along each command signal path into, and each telemetry signal path out of the subsystem. Normal operating modes that correspond to the performance of specific functions at the time of specific events in the mission are also discussed. Principal backup means of performing the normal Orbiter operating modes are included.

  1. Tethered Satellite System (TSS) core equipment

    NASA Technical Reports Server (NTRS)

    Bonifazi, C.

    1986-01-01

    To date, three Tethered Satellite System (TSS) missions of the Italian provided scientific satellite orbiting in the ionosphere connected to U.S. Space Shuttle is foreseen. The first mission will use an electrically conductive tether of 20 km deployed upward from the orbiter flying at 300 km altitude. This mission will allow investigation of the TSS electrodynamic interaction with the ionosphere due to the high voltage induced across the two terminators of the system during its motion throughout the geomagnetic field. The second mission will use a dielectric tether of 100 km deployed downward from the Orbiter flying at 230 km altitude. Tethered-vehicle access to altitude as low as 120 to 150 km from the Orbiter would permit direct long term observation of phenomena in the lower thermosphere and determination of other dynamical physical processes. The third mission would use the same configuration of the first electrodynamic mission with the complete Core Equipment. Study of power generation by tethered systems would be possible by operating the Core Equipment in the inverted current mode. This mode of operation would allow ion current collection upon the TSS satellite by controlling its potential with respect to the ambient ionospheric plasma. The main requirements of the Core Equipment configuration to date foreseen for the first TSS electrodynamic mission is described. Besides the Core Equipment purposes, its hardware and operational sub-modes of operation are described.

  2. Operationally optimal maneuver strategy for spacecraft injected into sub-geosynchronous transfer orbit

    NASA Astrophysics Data System (ADS)

    Kiran, B. S.; Singh, Satyendra; Negi, Kuldeep

    The GSAT-12 spacecraft is providing Communication services from the INSAT/GSAT system in the Indian region. The spacecraft carries 12 extended C-band transponders. GSAT-12 was launched by ISRO’s PSLV from Sriharikota, into a sub-geosynchronous Transfer Orbit (sub-GTO) of 284 x 21000 km with inclination 18 deg. This Mission successfully accomplished combined optimization of launch vehicle and satellite capabilities to maximize operational life of the s/c. This paper describes mission analysis carried out for GSAT-12 comprising launch window, orbital events study and orbit raising maneuver strategies considering various Mission operational constraints. GSAT-12 is equipped with two earth sensors (ES), three gyroscopes and digital sun sensor. The launch window was generated considering mission requirement of minimum 45 minutes of ES data for calibration of gyros with Roll-sun-pointing orientation in T.O. Since the T.O. period was a rather short 6.1 hr, required pitch biases were worked out to meet the gyro-calibration requirement. A 440 N Liquid Apogee Motor (LAM) is used for orbit raising. The objective of the maneuver strategy is to achieve desired drift orbit satisfying mission constraints and minimizing propellant expenditure. In case of sub-GTO, the optimal strategy is to first perform an in-plane maneuver at perigee to raise the apogee to synchronous level and then perform combined maneuvers at the synchronous apogee to achieve desired drift orbit. The perigee burn opportunities were examined considering ground station visibility requirement for monitoring the burn. Two maneuver strategies were proposed: an optimal five-burn strategy with two perigee burns centered around perigee#5 and perigee#8 with partial ground station visibility and three apogee burns with dual station visibility, a near-optimal five-burn strategy with two off-perigee burns at perigee#5 and perigee#8 with single ground station visibility and three apogee burns with dual station visibility. The range vector profiles were studied in the s/c frame during LAM burn phases and accurate polarization predictions were provided to supporting ground stations. The near optimal strategy was selected for implementation in order to ensure full visibility during each LAM burn. Contingency maneuver plans were generated in preparation for specified Propulsion system related contingencies. Maneuver plans were generated considering 3-sigma dispersions in T.O. GSAT-12 is positioned at 83 deg East longitude. The estimated operational life is about 11 years which was realized through operationally optimal maneuver strategy selected from the detailed mission analysis.

  3. An integral nuclear power and propulsion system concept

    NASA Astrophysics Data System (ADS)

    Choong, Phillip T.; Teofilo, Vincent L.; Begg, Lester L.; Dunn, Charles; Otting, William

    An integral space power concept provides both the electrical power and propulsion from a common heat source and offers superior performance capabilities over conventional orbital insertion using chemical propulsion systems. This paper describes a hybrid (bimodal) system concept based on a proven, inherently safe solid fuel form for the high temperature reactor core operation and rugged planar thermionic energy converter for long-life steady state electric power production combined with NERVA-based rocket technology for propulsion. The integral system is capable of long-life power operation and multiple propulsion operations. At an optimal thrust level, the integral system can maintain the minimal delta-V requirement while minimizing the orbital transfer time. A trade study comparing the overall benefits in placing large payloads to GEO with the nuclear electric propulsion option shows superiority of nuclear thermal propulsion. The resulting savings in orbital transfer time and the substantial reduction of overall lift requirement enables the use of low-cost launchers for several near-term military satellite missions.

  4. Applying Dynamical Systems Theory to Optimize Libration Point Orbit Stationkeeping Maneuvers for WIND

    NASA Technical Reports Server (NTRS)

    Brown, Jonathan M.; Petersen, Jeremy D.

    2014-01-01

    NASA's WIND mission has been operating in a large amplitude Lissajous orbit in the vicinity of the interior libration point of the Sun-Earth/Moon system since 2004. Regular stationkeeping maneuvers are required to maintain the orbit due to the instability around the collinear libration points. Historically these stationkeeping maneuvers have been performed by applying an incremental change in velocity, or (delta)v along the spacecraft-Sun vector as projected into the ecliptic plane. Previous studies have shown that the magnitude of libration point stationkeeping maneuvers can be minimized by applying the (delta)v in the direction of the local stable manifold found using dynamical systems theory. This paper presents the analysis of this new maneuver strategy which shows that the magnitude of stationkeeping maneuvers can be decreased by 5 to 25 percent, depending on the location in the orbit where the maneuver is performed. The implementation of the optimized maneuver method into operations is discussed and results are presented for the first two optimized stationkeeping maneuvers executed by WIND.

  5. Marned Orbital Systems Concept

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Despite the indefinite postponement of the Space Station in 1972, Marshall Space Flight Center (MSFC) continued to look to the future for some type of orbital facility during the post-Skylab years. In 1975, the MSFC directed a contract with the McDonnel Douglas Aerospace Company for the Manned Orbital Systems Concept (MOSC) study. This 9-month effort examined the requirements for, and defined a cost-effective orbital facility concept capable of, supporting extended manned missions in Earth orbit. The capabilities of this concept exceeded those envisioned for the Space Shuttle and Spacelab, both of which were limited by a 7 to 30-day orbital time constraint. The MOSC's initial operating capability was to be achieved in late 1984. A crew of four would man a four-module configuration. During its five-year orbital life the MOSC would have the capability to evolve into a larger 12-to-24-man facility. This is an artist's concept of MOSC.

  6. Orbital trim by velocity factoring with applications to the Viking mission.

    NASA Technical Reports Server (NTRS)

    Kibler, J. F.; Green, R. N.; Young, G. R.

    1972-01-01

    An orbital trim technique has been developed to satisfy terminal rendezvous and intermediate timing constraints for planetary missions involving orbital operations. The technique utilizes a time-open two-impulse transfer from a specified initial orbit to a final orbit which satisfies all geometrical constraints. Each of the two impulses may then be factored, or split, into two or more vectorially equivalent impulses. The periods of the resulting intermediate orbits may be varied along with the number of revolutions in each orbit to satisfy the intermediate and final timing constraints. Factors in the range 0 to 1 result in rendezvous at the same cost as that of the two-impulse transfer. The technique is applied to the Viking mission to Mars although a similar procedure could be utilized for rendezvous operations about any planet.

  7. Space Shuttle Orbiter auxiliary power unit

    NASA Technical Reports Server (NTRS)

    Mckenna, R.; Wicklund, L.; Baughman, J.; Weary, D.

    1982-01-01

    The Space Shuttle Orbiter auxiliary power units (APUs) provide hydraulic power for the Orbiter vehicle control surfaces (rudder/speed brake, body flap, and elevon actuation systems), main engine gimbaling during ascent, landing gear deployment and steering and braking during landing. Operation occurs during launch/ascent, in-space exercise, reentry/descent, and landing/rollout. Operational effectiveness of the APU is predicated on reliable, failure-free operation during each flight, mission life (reusability) and serviceability between flights (turnaround). Along with the accumulating flight data base, the status and results of efforts to achieve these long-run objectives is presented.

  8. Development of preliminary design concept for a multifunction display and control system for the Orbiter crew station. Task 4: Design concept recommendation

    NASA Technical Reports Server (NTRS)

    Spiger, R. J.; Farrell, R. J.; Holcomb, G. A.

    1982-01-01

    Application of multifunction display and control systems to the NASA Orbiter spacecraft offers the potential for reducing crew workload and improving the presentation of system status and operational data to the crew. A design concept is presented for the application of a multifunction display and control system (MFDCS) to the Orbital Maneuvering System and Electrical Power Distribution and Control System on the Orbiter spacecraft. The MFDCS would provide the capability for automation of procedures, fault prioritization and software reconfiguration of the MFDCS data base. The MFDCS would operate as a stand-alone processor to minimize the impact on the current Orbiter software. Supervisory crew command of all current functions would be retained through the use of several operating modes in the system. Both the design concept and the processes followed in defining the concept are described.

  9. Guidance and Navigation for Rendezvous and Proximity Operations with a Non-Cooperative Spacecraft at Geosynchronous Orbit

    NASA Technical Reports Server (NTRS)

    Barbee, Brent William; Carpenter, J. Russell; Heatwole, Scott; Markley, F. Landis; Moreau, Michael; Naasz, Bo J.; VanEepoel, John

    2010-01-01

    The feasibility and benefits of various spacecraft servicing concepts are currently being assessed, and all require that the servicer spacecraft perform rendezvous, proximity, and capture operations with the target spacecraft to be serviced. Many high-value spacecraft, which would be logical targets for servicing from an economic point of view, are located in geosynchronous orbit, a regime in which autonomous rendezvous and capture operations are not commonplace. Furthermore, existing GEO spacecraft were not designed to be serviced. Most do not have cooperative relative navigation sensors or docking features, and some servicing applications, such as de-orbiting of a non-functional spacecraft, entail rendezvous and capture with a spacecraft that may be non-functional or un-controlled. Several of these challenges have been explored via the design of a notional mission in which a nonfunctional satellite in geosynchronous orbit is captured by a servicer spacecraft and boosted into super-synchronous orbit for safe disposal. A strategy for autonomous rendezvous, proximity operations, and capture is developed, and the Orbit Determination Toolbox (ODTBX) is used to perform a relative navigation simulation to assess the feasibility of performing the rendezvous using a combination of angles-only and range measurements. Additionally, a method for designing efficient orbital rendezvous sequences for multiple target spacecraft is utilized to examine the capabilities of a servicer spacecraft to service multiple targets during the course of a single mission.

  10. Total Probability of Collision as a Metric for Finite Conjunction Assessment and Collision Risk Management

    NASA Technical Reports Server (NTRS)

    Frigm, Ryan C.; Hejduk, Matthew D.; Johnson, Lauren C.; Plakalovic, Dragan

    2015-01-01

    On-orbit collision risk is becoming an increasing mission risk to all operational satellites in Earth orbit. Managing this risk can be disruptive to mission and operations, present challenges for decision-makers, and is time-consuming for all parties involved. With the planned capability improvements to detecting and tracking smaller orbital debris and capacity improvements to routinely predict on-orbit conjunctions, this mission risk will continue to grow in terms of likelihood and effort. It is very real possibility that the future space environment will not allow collision risk management and mission operations to be conducted in the same manner as it is today. This paper presents the concept of a finite conjunction assessment-one where each discrete conjunction is not treated separately but, rather, as a continuous event that must be managed concurrently. The paper also introduces the Total Probability of Collision as an analogous metric for finite conjunction assessment operations and provides several options for its usage in a Concept of Operations.

  11. Operating Small Sat Swarms as a Single Entity: Introducing SODA

    NASA Technical Reports Server (NTRS)

    Conn, Tracie; Dono Perez, Andres

    2017-01-01

    Swarm concepts are a growing topic of interest in the small satellite community. Compared to a small satellite constellation, a swarm has the distinction of being multiple spacecraft in close proximity, in approximately the same orbit. Furthermore, we envision swarms to have capabilities for cross-link communication and station-keeping. Of particular interest is a means to maintain operator-specified geometry, alignment, and/or separation.From NASA's decadal survey, it is clear that simultaneous measurements from a 3D volume of space are desired for a variety of Earth scientific studies. As this mission concept is ultimately extended to deep space, some degree of local control for the swarm to self-correct its configuration is required. We claim that the practicality of ground commanding each individual satellite in the swarm is simply not a feasible concept of operations. In other words, the current state-of-practice does not scale to very large swarms (e.g. 100 spacecraft or more) without becoming cost prohibitive. To contain the operations costs and complexity, a new approach is required: the swarm must be operated as a unit, responding to high-level specifications for relative position and velocity.The Mission Design Division at NASA Ames Research Center is looking to the near future for opportunities to develop satellite swarm technology. As part of this effort, we are developing SODA (Swarm Orbital Dynamics Advisor), a tool that provides the orbital maneuvers required to achieve a desired type of relative swarm motion. The purpose of SODA is two-fold. First, it encompasses the algorithms and orbital dynamics model to enable the desired relative motion of the swarm satellites. The process starts with the user specifying the properties of a swarm configuration. This could be as simple as varying in-track spacing of the swarm in one orbit, or as complex as maintaining a specified 3D geometrical orientation. We presume that science objectives will drive this choice. Given these inputs, the tool provides the most efficient maneuver(s) to achieve the objective.Second, SODA provides a variety of visualization tools. We acknowledge that the relationship between a desired relative motion amongst the swarm, and the corresponding orbital parameters for each individual satellite may not be immediately apparent for ground controllers and mission planners. The purpose of SODA's visualization tools is to illustrate this concept clearly with a variety of graphics and animations. After computing the optimal orbital maneuvers to modify the swarm, these results are simulated to demonstrate successful swarm control.Our emphasis in this paper is on the importance of relating the desired motion of the swarm satellites relative to one another with the required orbital element changes. One cannot joystick a drifting swarm satellite back into position; the underlying orbital mechanics dictate the most efficient recovery maneuvers. To illustrate this point, results from several case study simulations are presented. We conclude with our forward work for ongoing SODA development and potential science applications.

  12. On-orbit checkout study. [for the synchronous meteorological satellite and the technology demonstration satellite

    NASA Technical Reports Server (NTRS)

    Pritchard, E. I.

    1977-01-01

    The spaceborne testing equipment carried by the orbiter and the measuring equipment onboard the satellite (telemetry) is tested to verify that each is operating satisfactorily. The satellite command system is also checked. Thermal stabilization with the satellite in the orbiter shadow is achieved in six to eight hours. Satellite subsystem tests are run, and thermal control by heaters is checked. Thermal stabilization with the satellite exposed to the sun (when the orbiter is in sunlight) is again achieved in an estimated six to eight hours. Subsystem tests are again run in the hot condition, and heat rejection tests are made.

  13. Primary propulsion of electrothermal, ion, and chemical systems for space-based radar orbit transfer

    NASA Technical Reports Server (NTRS)

    Wang, S.-Y.; Staiger, P. J.

    1985-01-01

    An orbit transfer mission concept has been studied for a Space-Based Radar (SBR) where 40 kW required for radar operation is assumed available for orbit transfer propulsion. Arcjet, pulsed electrothermal (PET), ion, and storable chemical systems are considered for the primary propulsion. Transferring two SBR per shuttle flight to 1112 km/60 deg using eiectrical propulsion systems offers an increased payload at the expense of increased trip time, up to 2000 kg each, which may be critical for survivability. Trade offs between payload mass, transfer time, launch site, inclination, and height of parking orbits are presented.

  14. Primary propulsion of electrothermal, ion and chemical systems for space-based radar orbit transfer

    NASA Technical Reports Server (NTRS)

    Wang, S. Y.; Staiger, P. J.

    1985-01-01

    An orbit transfer mission concept has been studied for a Space-Based Radar (SBR) where 40 kW required for radar operation is assumed available for orbit transfer propulsion. Arcjet, pulsed electrothermal (PET), ion, and storable chemical systems are considered for the primary propulsion. Transferring two SBR per shuttle flight to 1112 km/60 deg using electrical propulsion systems offers an increased payload at the expense of increased trip time, up to 2000 kg each, which may be critical for survivability. Trade offs between payload mass, transfer time, launch site, inclination, and height of parking orbits are presented.

  15. Power subsystem performance prediction /PSPP/ computer program.

    NASA Technical Reports Server (NTRS)

    Weiner, H.; Weinstein, S.

    1972-01-01

    A computer program which simulates the operation of the Viking Orbiter Power Subsystem has been developed. The program simulates the characteristics and interactions of a solar array, battery, battery charge controls, zener diodes, power conditioning equipment, and the battery spacecraft and zener diode-spacecraft thermal interfaces. This program has been used to examine the operation of the Orbiter power subsystem during critical phases of the Viking mission - from launch, through midcourse maneuvers, Mars orbital insertion, orbital trims, Lander separation, solar occultations and unattended operation - until the end of the mission. A typical computer run for the first 24 hours after launch is presented which shows the variations in solar array, zener diode, battery charger, batteries and user load characteristics during this period.

  16. Liquid Hydrogen Sensor Considerations for Space Exploration

    NASA Technical Reports Server (NTRS)

    Moran, Matthew E.

    2006-01-01

    The on-orbit management of liquid hydrogen planned for the return to the moon will introduce new considerations not encountered in previous missions. This paper identifies critical liquid hydrogen sensing needs from the perspective of reliable on-orbit cryogenic fluid management, and contrasts the fundamental differences in fluid and thermodynamic behavior for ground-based versus on-orbit conditions. Opportunities for advanced sensor development and implementation are explored in the context of critical Exploration Architecture operations such as on-orbit storage, docking, and trans-lunar injection burn. Key sensing needs relative to these operations are also examined, including: liquid/vapor detection, thermodynamic condition monitoring, mass gauging, and leak detection. Finally, operational aspects of an integrated system health management approach are discussed to highlight the potential impact on mission success.

  17. The Nimbus 6 data catalog, volume 12: Data orbits 9227 through 10043

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Nimbus 6 was successfully launched from the Western Test Range, Vandenberg Air Force Base, California at 08 hr. 12 min. 00 sec. GMT on 12 June 1975. The orbit was nearly circular at 1093 x 1105 km. Satellite operations from launch through 14 July (orbit 425) consisted of engineering evaluation of all spacecraft systems. As a result of that effort, data reception, accountability and processing were intermittent during that period. This volume reflects the operational changes that occurred to each individual subsystem on a bi-monthly basis. Also this volume incorporates significant findings and various subsystem summaries as detailed by the respective experimenter. During orbit 9793 (12 June 1977) Nimbus 6 successfully completed two years of operations.

  18. Ionospheric refraction effects on orbit determination using the orbit determination error analysis system

    NASA Technical Reports Server (NTRS)

    Yee, C. P.; Kelbel, D. A.; Lee, T.; Dunham, J. B.; Mistretta, G. D.

    1990-01-01

    The influence of ionospheric refraction on orbit determination was studied through the use of the Orbit Determination Error Analysis System (ODEAS). The results of a study of the orbital state estimate errors due to the ionospheric refraction corrections, particularly for measurements involving spacecraft-to-spacecraft tracking links, are presented. In current operational practice at the Goddard Space Flight Center (GSFC) Flight Dynamics Facility (FDF), the ionospheric refraction effects on the tracking measurements are modeled in the Goddard Trajectory Determination System (GTDS) using the Bent ionospheric model. While GTDS has the capability of incorporating the ionospheric refraction effects for measurements involving ground-to-spacecraft tracking links, such as those generated by the Ground Spaceflight Tracking and Data Network (GSTDN), it does not have the capability to incorporate the refraction effects for spacecraft-to-spacecraft tracking links for measurements generated by the Tracking and Data Relay Satellite System (TDRSS). The lack of this particular capability in GTDS raised some concern about the achievable accuracy of the estimated orbit for certain classes of spacecraft missions that require high-precision orbits. Using an enhanced research version of GTDS, some efforts have already been made to assess the importance of the spacecraft-to-spacecraft ionospheric refraction corrections in an orbit determination process. While these studies were performed using simulated data or real tracking data in definitive orbit determination modes, the study results presented here were obtained by means of covariance analysis simulating the weighted least-squares method used in orbit determination.

  19. In-Orbit Performance of the CALET Gamma-Ray Burst Monitor

    NASA Astrophysics Data System (ADS)

    Yamaoka, K.; Calet Collaboration

    2016-10-01

    This poster presentation describes in-orbit operation and performance of the CALET Gamma-ray Burst Monitor (CGBM) which has been operated for about one year since October 2015 on the International Space Station (ISS).

  20. Effective operators in a single-j orbital

    NASA Astrophysics Data System (ADS)

    Derbali, E.; Van Isacker, P.; Tellili, B.; Souga, C.

    2018-03-01

    We present an analysis of effective operators in the shell model with up to three-body interactions in the Hamiltonian and two-body terms in electromagnetic transition operators when the nucleons are either neutrons or protons occupying a single-j orbital. We first show that evidence for an effective three-body interaction exists in the N = 50 isotones and in the lead isotopes but that the separate components of such interaction are difficult to obtain empirically. We then determine higher-order terms on more microscopic grounds. The starting point is a realistic two-body interaction in a large shell-model space together with a standard one-body transition operator, which, after restriction to the dominant orbital and with use of stationary perturbation theory, are transformed into effective versions with higher-order terms. An application is presented for the lead isotopes with neutrons in the 1{g}9/2 orbital.

  1. The geostationary orbit and developing countries

    NASA Technical Reports Server (NTRS)

    Medina, E. R.

    1982-01-01

    The geostationary orbit is becoming congested due to use by several countries throughout the world, and the request for use of this orbit is increasing. There are 188 geostationary stations in operation. An equitable distribution of stations on this orbit is requested.

  2. Space platform expendables resupply concept definition study

    NASA Technical Reports Server (NTRS)

    1985-01-01

    NASA has recognized that the capability for remote resupply of space platform expendable fluids will help transition space utilization into a new era of operational efficiency and cost/effectiveness. The emerging Orbital Maneuvering System (OMV) in conjunction with an expendables resupply module will introduce the capability for fluid resupply enabling satellite lifetime extension at locations beyond the range of the Orbiter. This report summarizes a supplemental study to the original Phase A study and is presented as addenda to that study.

  3. On-Orbit Maintenance Operations Strategy for the International Space Station - Concept and Implementation

    NASA Technical Reports Server (NTRS)

    Patterson, Linda P.

    2001-01-01

    The International Space Station (ISS) has an operational mission and profile that makes it a Logistics and Maintenance (L&M) support challenge different from previous programs. It is permanently manned, assembled on orbit, and multi-national. With this technical and operational challenge, a unique approach is needed to support the hardware and crew. The key is the integration of on-orbit and ground analysis, supply, maintenance, and crew training into a coherent functional process that supports ISS goals and objectives. To integrate all the necessary aspects of hardware and personnel to support on-orbit maintenance, a myriad of products and processes must be created and coordinated, such that the right resources are in the right place at the right time to ensure continued ISS functionality. This paper will familiarize the audience with ISS On-Orbit Maintenance (OOM) concepts and capabilities for different maintenance tasks and discuss some of the logic behind their selection. It will also identify the operational maintenance support responsibility split between the U.S. and the various International Partners (IPs).

  4. Comparing orbiter and rover image-based mapping of an ancient sedimentary environment, Aeolis Palus, Gale crater, Mars

    NASA Astrophysics Data System (ADS)

    Stack, K. M.; Edwards, C. S.; Grotzinger, J. P.; Gupta, S.; Sumner, D. Y.; Calef, F. J.; Edgar, L. A.; Edgett, K. S.; Fraeman, A. A.; Jacob, S. R.; Le Deit, L.; Lewis, K. W.; Rice, M. S.; Rubin, D.; Williams, R. M. E.; Williford, K. H.

    2016-12-01

    This study provides the first systematic comparison of orbital facies maps with detailed ground-based geology observations from the Mars Science Laboratory (MSL) Curiosity rover to examine the validity of geologic interpretations derived from orbital image data. Orbital facies maps were constructed for the Darwin, Cooperstown, and Kimberley waypoints visited by the Curiosity rover using High Resolution Imaging Science Experiment (HiRISE) images. These maps, which represent the most detailed orbital analysis of these areas to date, were compared with rover image-based geologic maps and stratigraphic columns derived from Curiosity's Mast Camera (Mastcam) and Mars Hand Lens Imager (MAHLI). Results show that bedrock outcrops can generally be distinguished from unconsolidated surficial deposits in high-resolution orbital images and that orbital facies mapping can be used to recognize geologic contacts between well-exposed bedrock units. However, process-based interpretations derived from orbital image mapping are difficult to infer without known regional context or observable paleogeomorphic indicators, and layer-cake models of stratigraphy derived from orbital maps oversimplify depositional relationships as revealed from a rover perspective. This study also shows that fine-scale orbital image-based mapping of current and future Mars landing sites is essential for optimizing the efficiency and science return of rover surface operations.

  5. Comparing orbiter and rover image-based mapping of an ancient sedimentary environment, Aeolis Palus, Gale crater, Mars

    USGS Publications Warehouse

    Stack, Kathryn M.; Edwards, Christopher; Grotzinger, J. P.; Gupta, S.; Sumner, D.; Edgar, Lauren; Fraeman, A.; Jacob, S.; LeDeit, L.; Lewis, K.W.; Rice, M.S.; Rubin, D.; Calef, F.; Edgett, K.; Williams, R.M.E.; Williford, K.H.

    2016-01-01

    This study provides the first systematic comparison of orbital facies maps with detailed ground-based geology observations from the Mars Science Laboratory (MSL) Curiosity rover to examine the validity of geologic interpretations derived from orbital image data. Orbital facies maps were constructed for the Darwin, Cooperstown, and Kimberley waypoints visited by the Curiosity rover using High Resolution Imaging Science Experiment (HiRISE) images. These maps, which represent the most detailed orbital analysis of these areas to date, were compared with rover image-based geologic maps and stratigraphic columns derived from Curiosity’s Mast Camera (Mastcam) and Mars Hand Lens Imager (MAHLI). Results show that bedrock outcrops can generally be distinguished from unconsolidated surficial deposits in high-resolution orbital images and that orbital facies mapping can be used to recognize geologic contacts between well-exposed bedrock units. However, process-based interpretations derived from orbital image mapping are difficult to infer without known regional context or observable paleogeomorphic indicators, and layer-cake models of stratigraphy derived from orbital maps oversimplify depositional relationships as revealed from a rover perspective. This study also shows that fine-scale orbital image-based mapping of current and future Mars landing sites is essential for optimizing the efficiency and science return of rover surface operations.

  6. Space shuttle environmental control/life support systems

    NASA Technical Reports Server (NTRS)

    1972-01-01

    This study analyzes and defines a baseline Environmental Control/Life Support System (EC/LSS) for a four-man, seven-day orbital shuttle. In addition, the impact of various mission parameters, crew size, mission length, etc. are examined for their influence on the selected system. Pacing technology items are identified to serve as a guide for application of effort to enhance the total system optimization. A fail safe-fail operation philosophy was utilized in designing the system. This has resulted in a system that requires only one daily routine operation. All other critical item malfunctions are automatically resolved by switching to redundant modes of operation. As a result of this study, it is evident that a practical, flexible, simple and long life, EC/LSS can be designed and manufactured for the shuttle orbiter within the time phase required.

  7. Orbital implant exposure treatment with porcine dermal collagen patching.

    PubMed

    Alwitry, A; Burns, S J; Abercrombie, L C

    2006-09-01

    To present a small case series of orbital implant exposures treated with porcine dermal collagen (Permacol, Tissue Science Laboratories PLC, Aldershot, Hants, UK) patching. A retrospective chart review of three cases of orbital implant exposure treated with Permacol patching. Three cases were identified. There were 4 operative episodes of Permacol patching (one socket had two attempts at permacol patching). In all 4 cases the patch rapidly failed and melted away leaving behind the orbital implant exposure. All 3 patients required implant removal. Orbital implant exposure remains a major long-term complication of evisceration and enucleation procedures. On the basis of our experience, we would not recommend using Permacol as a non-autologous material for covering exposed Medpor (Medpor, Porex Surgical, Atlanta, Georgia, USA) orbital implants. Further study is required to fully assess the safety and efficacy profile of Permacol in socket surgery.

  8. Evaluation of TDRSS-user orbit determination accuracy using batch least-squares and sequential methods

    NASA Technical Reports Server (NTRS)

    Oza, D. H.; Jones, T. L.; Hodjatzadeh, M.; Samii, M. V.; Doll, C. E.; Hart, R. C.; Mistretta, G. D.

    1991-01-01

    The development of the Real-Time Orbit Determination/Enhanced (RTOD/E) system as a prototype system for sequential orbit determination on a Disk Operating System (DOS) based Personal Computer (PC) is addressed. The results of a study to compare the orbit determination accuracy of a Tracking and Data Relay Satellite System (TDRSS) user spacecraft obtained using RTOD/E with the accuracy of an established batch least squares system, the Goddard Trajectory Determination System (GTDS), is addressed. Independent assessments were made to examine the consistencies of results obtained by the batch and sequential methods. Comparisons were made between the forward filtered RTOD/E orbit solutions and definitive GTDS orbit solutions for the Earth Radiation Budget Satellite (ERBS); the maximum solution differences were less than 25 m after the filter had reached steady state.

  9. Science Planning and Orbit Classification for Solar Probe Plus

    NASA Astrophysics Data System (ADS)

    Kusterer, M. B.; Fox, N. J.; Rodgers, D. J.; Turner, F. S.

    2016-12-01

    There are a number of challenges for the Science Planning Team (SPT) of the Solar Probe Plus (SPP) Mission. Since SPP is using a decoupled payload operations approach, tight coordination between the mission operations and payload teams will be required. The payload teams must manage the volume of data that they write to the spacecraft solid-state recorders (SSR) for their individual instruments for downlink to the ground. Making this process more difficult, the geometry of the celestial bodies and the spacecraft during some of the SPP mission orbits cause limited uplink and downlink opportunities. The payload teams will also be required to coordinate power on opportunities, command uplink opportunities, and data transfers from instrument memory to the spacecraft SSR with the operation team. The SPT also intend to coordinate observations with other spacecraft and ground based systems. To solve these challenges, detailed orbit activity planning is required in advance for each orbit. An orbit planning process is being created to facilitate the coordination of spacecraft and payload activities for each orbit. An interactive Science Planning Tool is being designed to integrate the payload data volume and priority allocations, spacecraft ephemeris, attitude, downlink and uplink schedules, spacecraft and payload activities, and other spacecraft ephemeris. It will be used during science planning to select the instrument data priorities and data volumes that satisfy the orbit data volume constraints and power on, command uplink and data transfer time periods. To aid in the initial stages of science planning we have created an orbit classification scheme based on downlink availability and significant science events. Different types of challenges arise in the management of science data driven by orbital geometry and operational constraints, and this scheme attempts to identify the patterns that emerge.

  10. The Dawn of Vesta Science

    NASA Technical Reports Server (NTRS)

    Garner, Charles E.; Rayman, Marc D.; Brophy, John R.; Mikes, Steven C.

    2011-01-01

    The Dawn mission is part of NASA's Discovery Program and has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide a total ?V of 11.3 km/s for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer between Ceres science orbits. Fullpower thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional ?V of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. An additional 210 hours of IPS thrusting was used to enter the first Vesta science orbit, called Survey orbit, on August 3, 2011 at an altitude of approximately 2,735 km. To date the IPS has been operated for 23,621 hours, consumed approximately 252 kg of xenon, and provided a delta-V of approximately 6.7 km/s. The IPS performance characteristics are very close to the expected performance based on analysis and testing performed pre-launch. The only significant issue in over the almost four years of IPS operations in flight was the temporary failure of a valve driver board in the Digital Control and Interface Unit-1 (DCIU-1), resulting in a loss of thrust of approximately 29 hours. Thrusting operations resumed after switching to DCIU-2, and power cycling conducted after orbit capture restored DCIU-1 to full functionality. After about three weeks of Survey orbit operations the IPS will be used to transfer the spacecraft to the other planned science orbit altitudes. After approximately one year of science operations the IPS will be used for escape from Vesta and then for thrusting to Ceres with a planned arrival date at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through the start of science operations at Vesta.

  11. Study of a homotopy continuation method for early orbit determination with the Tracking and Data Relay Satellite System (TDRSS)

    NASA Technical Reports Server (NTRS)

    Smith, R. L.; Huang, C.

    1986-01-01

    A recent mathematical technique for solving systems of equations is applied in a very general way to the orbit determination problem. The study of this technique, the homotopy continuation method, was motivated by the possible need to perform early orbit determination with the Tracking and Data Relay Satellite System (TDRSS), using range and Doppler tracking alone. Basically, a set of six tracking observations is continuously transformed from a set with known solution to the given set of observations with unknown solutions, and the corresponding orbit state vector is followed from the a priori estimate to the solutions. A numerical algorithm for following the state vector is developed and described in detail. Numerical examples using both real and simulated TDRSS tracking are given. A prototype early orbit determination algorithm for possible use in TDRSS orbit operations was extensively tested, and the results are described. Preliminary studies of two extensions of the method are discussed: generalization to a least-squares formulation and generalization to an exhaustive global method.

  12. TDRSS system configuration study for space shuttle program

    NASA Technical Reports Server (NTRS)

    1978-01-01

    This study was set up to assure that operation of the shuttle orbiter communications systems met the program requirements when subjected to electrical conditions similar to those which will be encountered during the operational mission. The test program intended to implement an integrated test bed, consisting of applicable orbiter, EVA, payload simulator, STDN, and AF/SCF, as well as the TDRSS equipment. The stated intention of Task 501 Program was to configure the test bed with prototype hardware for a system development test and production hardware for a system verification test. In case of TDRSS when the hardware was not available, simulators whose functional performance was certified to meet appropriate end item specification were used.

  13. Interactive orbital proximity operations planning system

    NASA Technical Reports Server (NTRS)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1990-01-01

    An interactive graphical planning system for on-site planning of proximity operations in the congested multispacecraft environment about the space station is presented. The system shows the astronaut a bird's eye perspective of the space station, the orbital plane, and the co-orbiting spacecraft. The system operates in two operational modes: (1) a viewpoint mode, in which the astronaut is able to move the viewpoint around in the orbital plane to range in on areas of interest; and (2) a trajectory design mode, in which the trajectory is planned. Trajectory design involves the composition of a set of waypoints which result in a fuel-optimal trajectory which satisfies all operational constraints, such as departure and arrival constraints, plume impingement constraints, and structural constraints. The main purpose of the system is to present the trajectory and the constraints in an easily interpretable graphical format. Through a graphical interactive process, the trajectory waypoints are edited until all operational constraints are satisfied. A series of experiments was conducted to evaluate the system. Eight airline pilots with no prior background in orbital mechanics participated in the experiments. Subject training included a stand-alone training session of about 6 hours duration, in which the subjects became familiar with orbital mechanics concepts and performed a series of exercises to familiarize themselves with the control and display features of the system. They then carried out a series of production runs in which 90 different trajectory design situations were randomly addressed. The purpose of these experiments was to investigate how the planning time, planning efforts, and fuel expenditures were affected by the planning difficulty. Some results of these experiments are presented.

  14. Space shuttle engineering and operations support. Avionics system engineering

    NASA Technical Reports Server (NTRS)

    Broome, P. A.; Neubaur, R. J.; Welsh, R. T.

    1976-01-01

    The shuttle avionics integration laboratory (SAIL) requirements for supporting the Spacelab/orbiter avionics verification process are defined. The principal topics are a Spacelab avionics hardware assessment, test operations center/electronic systems test laboratory (TOC/ESL) data processing requirements definition, SAIL (Building 16) payload accommodations study, and projected funding and test scheduling. Because of the complex nature of the Spacelab/orbiter computer systems, the PCM data link, and the high rate digital data system hardware/software relationships, early avionics interface verification is required. The SAIL is a prime candidate test location to accomplish this early avionics verification.

  15. A mission to preserve the geostationary region

    NASA Astrophysics Data System (ADS)

    Smith, D. A.; Martin, C.; Kassebom, M.; Petersen, H.; Shaw, A.; Skidmore, B.; Smith, D.; Stokes, H.; Willig, A.

    2004-01-01

    The RObotic Geostationary orbit Restorer, ROGER, is a programme aimed at reducing the risk to satellite operations posed by the existence of failed and spent satellites and other categories of space debris. To achieve this, the concept of mass removal by an intervention mission is considered for the GEO region. This paper describes the results of studies into the level of risk posed at present and in the near future to GEO assets. It also investigates practical means for re-orbiting objects that can no longer be manoeuvred away from the operational GEO region by ground command.

  16. Astronaut Carl Walz shows off stowage locker for GPS on-orbit operations

    NASA Technical Reports Server (NTRS)

    1993-01-01

    On Discovery's middeck Astronaut Carl E. Walz shows off stowage locker for gear supporting the Global Positioning System (GPS) on-orbit operations. To the left is a sign which reads 'Ace HST Tool Testers'.

  17. Mars Telecommunications Orbiter Ka-band system design and operations

    NASA Technical Reports Server (NTRS)

    Noreen, Gary; Komarek, Tomas; Diehl, Roger; Shambayati, Shervin; Breidenthal, Julian; Lopez, Saturnino; Jordan, Frank

    2003-01-01

    NASA's Mars Telecommunications Orbiter (MTO) will relay broadband communications from landers, rovers and spacecraft in the vicinity of Mars to Earth. This paper describes the MTO communications system and how the MTO Ka-band system will be operated.

  18. Early Program Development

    NASA Image and Video Library

    1970-01-01

    This 1970 artist's concept shows the Nuclear Shuttle and Space Tug operating in conjunction with other spacecraft to support lunar exploration. Marshall Space Flight Center plans during the late 1960s for lunar orbital and surface bases required extensive logistics operations in lunar orbit.

  19. Development of a Remotely Operated Autonomous Satellite Tracking System

    DTIC Science & Technology

    2010-03-01

    ability of Commercial-Off-The-Shelf (COTS) optical observation equipment to track and image Low Earth Orbiting (LEO) satellites. Using radar data in...SOR operates one of the world’s premier adaptive-optics telescopes capable of tracking low -earth orbiting satellites. The telescope has a 3.5-meter...student) published his thesis Initial Determination of Low Earth Orbits Using Commercial Telescopes. According to this document’s Problem Statement

  20. Satellite services system analysis study. Volume 3: Service equipment requirements

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Service equipment mission requirements are discussed. On-orbit operations, satellite classes, and reference missions are included. Service equipment usage and requirements are considered. Equipment identification methodology is discussed. Service equipment usage is analyzed, including initial launch, revisit, Earth return, and orbital storage. A summary of service requirements and equipment is presented, including service equipment status, even interaction, satellite features, and observations.

  1. Ohio Senator John Glenn tours the orbiter Columbia's middeck

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Astronaut Stephen Oswald, at left, listens to Ohio Senator John Glenn on the orbiter Columbia's middeck as the senator asks questions regarding Shuttle operations at the Orbiter Processing Facility 3 at Kennedy Space Center. Senator Glenn arrived at KSC on Jan. 20 to tour KSC operational areas and to view the launch of STS-89 later this week. Glenn, who made history in 1962 as the first American to orbit the Earth, completing three orbits in a five-hour flight aboard Friendship 7, will fly his second space mission aboard Space Shuttle Discovery this October. Glenn is retiring from the Senate at the end of this year and will be a payload specialist aboard STS-95.

  2. Orbital transfer vehicle launch operations study. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1986-01-01

    The purpose was to use the operational experience at the launch site to identify, describe and quantify the operational impacts of the various configurations on the Kennedy Space Center (KSC) and/or space station launch sites. Orbital Transfer Vehicle (OTV) configurations are being developed/defined by contractor teams. Lacking an approved configuration, the KSC Study Team defined a Reference Configuration to be used for this study. This configuration then become the baseline for the identification of the facilities, personnel and crew skills required for processing the OTV in a realistic manner that would help NASA achieve the lowest possible OTV life cycle costs. As the study progressed, researchers' initial apraisal that the vehicle, when delivered, would be a sophisticated, state-of-the-art vehicle was reinforced. It would be recovered and reused many times so the primary savings to be gained would be in the recurring-cycle of the vehicle operations--even to the point where it would be beneficial to break from tradition and make a significant expenditure in the development of processing facilities at the beginning of the program.

  3. Growth in the Number of SSN Tracked Orbital Objects

    NASA Technical Reports Server (NTRS)

    Stansbery, Eugene G.

    2004-01-01

    The number of objects in earth orbit tracked by the US Space Surveillance Network (SSN) has experienced unprecedented growth since March, 2003. Approximately 2000 orbiting objects have been added to the "Analyst list" of tracked objects. This growth is primarily due to the resumption of full power/full time operation of the AN/FPS-108 Cobra Dane radar located on Shemya Island, AK. Cobra Dane is an L-band (23-cm wavelength) phased array radar which first became operational in 1977. Cobra Dane was a "Collateral Sensor" in the SSN until 1994 when its communication link with the Space Control Center (SCC) was closed. NASA and the Air Force conducted tests in 1999 using Cobra Dane to detect and track small debris. These tests confirmed that the radar was capable of detecting and maintaining orbits on objects as small as 5-cm diameter. Subsequently, Cobra Dane was reconnected to the SSN and resumed full power/full time space surveillance operations on March 4, 2003. This paper will examine the new data and its implications to the understanding of the orbital debris environment and orbital safety.

  4. Requirements and applications for robotic servicing of military space systems

    NASA Technical Reports Server (NTRS)

    Ledford, Otto C., Jr.; Bennett, Rodney G.

    1992-01-01

    The utility of on-orbit servicing of spacecraft has been demonstrated by NASA several times using shuttle-based astronaut EVA. There has been interest in utilizing on-orbit servicing for military space systems as well. This interest has been driven by the increasing reliance of all branches of the military upon space-based assets, the growing numbers, complexity, and cost of those assets, and a desire to normalize support policies for space-based operations. Many military satellites are placed in orbits which are unduly hostile for astronaut operations and/or cannot be reached by the shuttle. In addition, some of the projected tasks may involve hazardous operations. This has led to a focus on robotic systems, instead of astronauts, for the basis of projected servicing systems. This paper describes studies and activities which will hopefully lead to on-orbit servicing being one of the tools available to military space systems designers and operators. The utility of various forms of servicing has been evaluated for present and projected systems, critical technologies have been identified, and strategies for the development and insertion of this technology into operational systems have been developed. Many of the projected plans have been adversely affected by budgetary restrictions and evolving architectures, but the fundamental benefits and requirements are well understood. A method of introducing servicing capabilities in a manner which has a low impact on the system designer and does not require the prior development of an expensive infrastructure is discussed. This can potentially lead to an evolutionary implementation of the full technology.

  5. Aerodynamic studies of delta-wing shuttle orbiters. Part 1: Low speed

    NASA Technical Reports Server (NTRS)

    Freeman, D. C., Jr.; Ellison, J. C.

    1972-01-01

    Numerous wind tunnel tests conducted on the evolving delta-wing orbiters have generated a fairly large aerodynamic data base over the entire entry operation range of these vehicles. A limited assessment is made of some of the aerodynamics of the current HO type orbiters, and several specific problem areas selected from the broad data base are discussed. These include, from a subsonic viewpoint, discussions of trim drag effect; effects of the installation of main rocket engine nozzles, OMS and RCS packages, Reynolds number effects, lateral-directional stability characteristics, and landing characteristics.

  6. Definition of technology development missions for early space stations orbit transfer vehicle serving. Phase 2, task 1: Space station support of operational OTV servicing

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Representative space based orbital transfer vehicles (OTV), ground based vehicle turnaround assessment, functional operational requirements and facilities, mission turnaround operations, a comparison of ground based versus space based tasks, activation of servicing facilities prior to IOC, fleet operations requirements, maintenance facilities, OTV servicing facilities, space station support requirements, and packaging for delivery are discussed.

  7. Space Station tethered refueling facility operations

    NASA Technical Reports Server (NTRS)

    Kiefel, E. R.; Rudolph, L. K.; Fester, D. A.

    1986-01-01

    The space-based orbital transfer vehicle will require a large cryogenic fuel storage facility at the Space Station. An alternative to fuel storage onboard the Space Station, is on a tethered orbital refueling facility (TORF) which is separated from the Space Station by a sufficient distance to induce a gravity gradient to settle the propellants. Facility operations are a major concern associated with a tethered LO2/LH2 storage depot. A study was carried out to analyze these operations so as to identify the preferred TORF deployment direction (up or down) and whether the TORF should be permanently or intermittently deployed. The analyses considered safety, contamination, rendezvous, servicing, transportation rate, communication, and viewing. An upwardly, intermittently deployed facility is the preferred configuration for a tethered cryogenic fuel storage.

  8. Power system interface and umbilical system study

    NASA Technical Reports Server (NTRS)

    1980-01-01

    System requirements and basic design criteria were defined for berthing or docking a payload to the 25 kW power module which will provide electrical power and attitude control, cooling, data transfer, and communication services to free-flying and Orbiter sortie payloads. The selected umbilical system concept consists of four assemblies and command and display equipment to be installed at the Orbiter payload specialist station: (1) a movable platen assembly which is attached to the power system with EVA operable devices; (2) a slave platen assembly which is attached to the payload with EVA operable devices; (3) a fixed secondary platen permanently installed in the power system; and (4) a fixed secondary platen permanently installed on the payload. Operating modes and sequences are described.

  9. Experiment module concepts study. Volume 2: Experiments and mission operations

    NASA Technical Reports Server (NTRS)

    Macdonald, J. M.

    1970-01-01

    The baseline experiment program is concerned with future space experiments and cover the scientific disciplines of astronomy, space physics, space biology, biomedicine and biotechnology, earth applications, materials science, and advanced technology. The experiments within each discipline are grouped into functional program elements according to experiments that support a particular area of research or investigation and experiments that impose similar or related demand on space station support systems. The experiment requirements on module subsystems, experiment operating modes and time profiles, and the role of the astronaut are discussed. Launch and rendezvous with the space station, disposal, and on-orbit operations are delineated. The operational interfaces between module and other system elements are presented and include space station and logistic system interfaces. Preliminary launch and on-orbit environmental criteria and requirements are discussed, and experiment equipment weights by functional program elements are tabulated.

  10. Lunar Reconnaissance Orbiter Orbit Determination Accuracy Analysis

    NASA Technical Reports Server (NTRS)

    Slojkowski, Steven E.

    2014-01-01

    Results from operational OD produced by the NASA Goddard Flight Dynamics Facility for the LRO nominal and extended mission are presented. During the LRO nominal mission, when LRO flew in a low circular orbit, orbit determination requirements were met nearly 100% of the time. When the extended mission began, LRO returned to a more elliptical frozen orbit where gravity and other modeling errors caused numerous violations of mission accuracy requirements. Prediction accuracy is particularly challenged during periods when LRO is in full-Sun. A series of improvements to LRO orbit determination are presented, including implementation of new lunar gravity models, improved spacecraft solar radiation pressure modeling using a dynamic multi-plate area model, a shorter orbit determination arc length, and a constrained plane method for estimation. The analysis presented in this paper shows that updated lunar gravity models improved accuracy in the frozen orbit, and a multiplate dynamic area model improves prediction accuracy during full-Sun orbit periods. Implementation of a 36-hour tracking data arc and plane constraints during edge-on orbit geometry also provide benefits. A comparison of the operational solutions to precision orbit determination solutions shows agreement on a 100- to 250-meter level in definitive accuracy.

  11. Satellite orbital conjunction reports assessing threatening encounters in space (SOCRATES)

    NASA Astrophysics Data System (ADS)

    Kelso, T. S.; Alfano, S.

    2006-05-01

    While many satellite operators are aware of the possibility of a collision between their satellite and another object in earth orbit, most seem unaware of the frequency of near misses occurring each day. Until recently, no service existed to advise satellite operators of an impending conjunction of a satellite payload with another satellite, putting the responsibility for determining these occurrences squarely on the satellite operator's shoulders. This problem has been further confounded by the lack of a timely, comprehensive data set of satellite orbital element sets and computationally efficient tools to provide predictions using industry-standard software. As a result, hundreds of conjunctions within 1 km occur each week, with little or no intervention, putting billions of dollars of space hardware at risk, along with their associated missions. As a service to the satellite operator community, the Center for Space Standards & Innovation (CSSI) offers SOCRATES-Satellite Orbital Conjunction Reports Assessing Threatening Encounters in Space. Twice each day, CSSI runs a list of all satellite payloads on orbit against a list of all objects on orbit using the catalog of all unclassified NORAD two-line element sets to look for conjunctions over the next seven days. The runs are made using STK/CAT-Satellite Tool Kit's Conjunction Analysis Tools-together with the NORAD SGP4 propagator in STK. This paper will discuss how SOCRATES works and how it can help satellite operators avoid undesired close approaches through advanced mission planning.

  12. Nuclear reactor power for a space-based radar. SP-100 project

    NASA Technical Reports Server (NTRS)

    Bloomfield, Harvey; Heller, Jack; Jaffe, Leonard; Beatty, Richard; Bhandari, Pradeep; Chow, Edwin; Deininger, William; Ewell, Richard; Fujita, Toshio; Grossman, Merlin

    1986-01-01

    A space-based radar mission and spacecraft, using a 300 kWe nuclear reactor power system, has been examined, with emphasis on aspects affecting the power system. The radar antenna is a horizontal planar array, 32 X 64 m. The orbit is at 61 deg, 1088 km. The mass of the antenna with support structure is 42,000 kg; of the nuclear reactor power system, 8,300 kg; of the whole spacecraft about 51,000 kg, necessitating multiple launches and orbital assembly. The assembly orbit is at 57 deg, 400 km, high enough to provide the orbital lifetime needed for orbital assembly. The selected scenario uses six Shuttle launches to bring the spacecraft and a Centaur G upper-stage vehicle to assembly orbit. After assembly, the Centaur places the spacecraft in operational orbit, where it is deployed on radio command, the power system started, and the spacecraft becomes operational. Electric propulsion is an alternative and allows deployment in assembly orbit, but introduces a question of nuclear safety.

  13. X-34 Main Propulsion System Design and Operation

    NASA Technical Reports Server (NTRS)

    Champion, R. J., Jr.; Darrow, R. J., Jr.

    1998-01-01

    The X-34 program is a joint industry/government program to develop, test, and operate a small, fully-reusable hypersonic flight vehicle, utilizing technologies and operating concepts applicable to future Reusable Launch Vehicle (RLV) systems. The vehicle will be capable of Mach 8 flight to 250,000 feet altitude and will demonstrate an all composite structure, composite RP-1 tank, the Marshall Space Flight Center (MSFC) developed Fastrac engine, and the operability of an advanced thermal protection systems. The vehicle will also be capable of carrying flight experiments. MSFC is supporting the X-34 program in three ways: Program Management, the Fastrac engine as Government Furnished Equipment (GFE), and the design of the Main Propulsion System (MPS). The MPS Product Development Team (PDT) at MSFC is responsible for supplying the MPS design, analysis, and drawings to Orbital. The MPS consists of the LOX and RP-1 Fill, Drain, Feed, Vent, & Dump systems and the Helium & Nitrogen Purge, Pressurization, and Pneumatics systems. The Reaction Control System (RCS) design was done by Orbital. Orbital is the prime contractor and has responsibility for integration, procurement, and construction of all subsystems. The paper also discusses the design, operation, management, requirements, trades studies, schedule, and lessons learning with the MPS and RCS designs.

  14. 47 CFR 25.282 - Orbit raising maneuvers.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... geostationary satellite orbit under this part is also authorized to transmit in connection with short-term... the space station is authorized to operate once it reaches its assigned geostationary orbital location...

  15. 47 CFR 25.282 - Orbit raising maneuvers.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... geostationary satellite orbit under this part is also authorized to transmit in connection with short-term... the space station is authorized to operate once it reaches its assigned geostationary orbital location...

  16. 47 CFR 25.282 - Orbit raising maneuvers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... geostationary satellite orbit under this part is also authorized to transmit in connection with short-term... the space station is authorized to operate once it reaches its assigned geostationary orbital location...

  17. 47 CFR 25.282 - Orbit raising maneuvers.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... geostationary satellite orbit under this part is also authorized to transmit in connection with short-term... the space station is authorized to operate once it reaches its assigned geostationary orbital location...

  18. 47 CFR 25.282 - Orbit raising maneuvers.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... geostationary satellite orbit under this part is also authorized to transmit in connection with short-term... the space station is authorized to operate once it reaches its assigned geostationary orbital location...

  19. 47 CFR 25.280 - Inclined orbit operations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of the Earth and centered on the satellite's designated service area; (2) Control all electrical... inclined orbit; and (4) Continue to maintain the space station at the authorized longitude orbital location...

  20. The Aerospace Safety Advisory panel's report to Doctor Robert A. Frosch, 1977

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Risks attendant to NASA's operations are identified for the following: mission operations; orbiter readiness for orbital flight tests; space shuttle main engine; avionics; thermal projection system; hazard assessment; human error. Past and future projects are assessed.

  1. ESOC's System for Interplanetary Orbit Determination: Implementation and Operational Experience

    NASA Astrophysics Data System (ADS)

    Budnik, F.; Morley, T. A.; MacKenzie, R. A.

    A system for interplanetary orbit determination has been developed at ESOC over the past six years. Today, the system is in place and has been proven to be both reliable and robust by successfully supporting critical operations of ESA's interplanetary spacecraft Rosetta, Mars Express, and SMART-1. To reach this stage a long and challenging way had to be travelled. This paper gives a digest about the journey from the development and testing to the operational use of ESOC's new interplanetary orbit determination system. It presents the capabilities and reflects experiences gained from the performed tests and tracking campaigns.

  2. Seasat. Volume 3: Ground systems

    NASA Technical Reports Server (NTRS)

    Pounder, E. (Editor)

    1980-01-01

    The Seasat Project was a feasibility demonstration of the use of orbital remote sensing for global ocean observation. The satellite was launched in June of 1978 and was operated successfully until October 1978. A massive electrical failure occurred in the power system, terminating the mission prematurely. The ground systems using during the mission life are discussed. Descriptions of the operating organization, the system elements, and the testing program are included. The various phases of the mission: launch and orbit insertion; cruise; and calibration are discussed. A special section is included on the orbit maneuver activites. Operations during the satellite failure are reviewed and summarized.

  3. Microwave Power Transmission System Studies. Volume 1: Executive Summary

    NASA Technical Reports Server (NTRS)

    Maynard, O. E.; Brown, W. C.; Edwards, A.; Meltz, G.; Haley, J. T.; Howell, J. M.; Nathan, A.

    1975-01-01

    A study of microwave power generation, transmission, reception and control was conducted as a part of a program to demonstrate the feasibility of power transmission from geosynchronous orbit. A summary is presented of results concerning design approaches, estimated costs (ROM), critical technology, associated ground and orbital test programs with emphasis on dc to rf conversion, transmitting antenna, phase control, mechanical systems, flight operations, ground power receiving-rectifying antenna with systems analysis, and evaluation. Recommendations for early further in-depth studies complementing the technology program are included.

  4. Space shuttle navigation analysis

    NASA Technical Reports Server (NTRS)

    Jones, H. L.; Luders, G.; Matchett, G. A.; Sciabarrasi, J. E.

    1976-01-01

    A detailed analysis of space shuttle navigation for each of the major mission phases is presented. A covariance analysis program for prelaunch IMU calibration and alignment for the orbital flight tests (OFT) is described, and a partial error budget is presented. The ascent, orbital operations and deorbit maneuver study considered GPS-aided inertial navigation in the Phase III GPS (1984+) time frame. The entry and landing study evaluated navigation performance for the OFT baseline system. Detailed error budgets and sensitivity analyses are provided for both the ascent and entry studies.

  5. Space platform expendables resupply concept definition study, volume 2

    NASA Technical Reports Server (NTRS)

    1984-01-01

    NASA has recognized that the capability for remote resupply of space platform expendable fluids will help transition space utilization into a new era of operational efficiency and cost/effectiveness. The emerging Orbital Maneuvering System (OMV) in conjunction with an expendables resupply module will introduce the capability for fluid resupply enabling satellite lifetime extension at locations beyond the range of the Orbiter. This report summarizes a Phase A study of a remote resupply module for the OMV. Volume 2 represents study results.

  6. The role of the real-time simulation facility, SIMFAC, in the design, development and performance verification of the Shuttle Remote Manipulator System (SRMS) with man-in-the-loop

    NASA Technical Reports Server (NTRS)

    Mccllough, J. R.; Sharpe, A.; Doetsch, K. H.

    1980-01-01

    The SIMFAC has played a vital role in the design, development, and performance verification of the shuttle remote manipulator system (SRMS) to be installed in the space shuttle orbiter. The facility provides for realistic man-in-the-loop operation of the SRMS by an operator in the operator complex, a flightlike crew station patterned after the orbiter aft flight deck with all necessary man machine interface elements, including SRMS displays and controls and simulated out-of-the-window and CCTV scenes. The characteristics of the manipulator system, including arm and joint servo dynamics and control algorithms, are simulated by a comprehensive mathematical model within the simulation subsystem of the facility. Major studies carried out using SIMFAC include: SRMS parameter sensitivity evaluations; the development, evaluation, and verification of operating procedures; and malfunction simulation and analysis of malfunction performance. Among the most important and comprehensive man-in-the-loop simulations carried out to date on SIMFAC are those which support SRMS performance verification and certification when the SRMS is part of the integrated orbiter-manipulator system.

  7. Trajectory Options for a Potential Mars Mission Combining Orbiting Science, Relay and a Sample Return Rendezvous Demonstration

    NASA Technical Reports Server (NTRS)

    Guinn, Joseph R.; Kerridge, Stuart J.; Wilson, Roby S.

    2012-01-01

    Mars sample return is a major scientific goal of the 2011 US National Research Council Decadal Survey for Planetary Science. Toward achievement of this goal, recent architecture studies have focused on several mission concept options for the 2018/2020 Mars launch opportunities. Mars orbiters play multiple roles in these architectures such as: relay, landing site identification/selection/certification, collection of on-going or new measurements to fill knowledge gaps, and in-orbit collection and transportation of samples from Mars to Earth. This paper reviews orbiter concepts that combine these roles and describes a novel family of relay orbits optimized for surface operations support. Additionally, these roles provide an intersection of objectives for long term NASA science, human exploration, technology development and international collaboration.

  8. Formation flying for electric sails in displaced orbits. Part I: Geometrical analysis

    NASA Astrophysics Data System (ADS)

    Wang, Wei; Mengali, Giovanni; Quarta, Alessandro A.; Yuan, Jianping

    2017-09-01

    We present a geometrical methodology for analyzing the formation flying of electric solar wind sail based spacecraft that operate in heliocentric, elliptic, displaced orbits. The spacecraft orbit is maintained by adjusting its propulsive acceleration modulus, whose value is estimated using a thrust model that takes into account a variation of the propulsive performance with the sail attitude. The properties of the relative motion of the spacecraft are studied in detail and a geometrical solution is obtained in terms of relative displaced orbital elements, assumed to be small quantities. In particular, for the small eccentricity case (i.e. for a near-circular displaced orbit), the bounds characterized by the extreme values of relative distances are analytically calculated, thus providing an useful mathematical tool for preliminary design of the spacecraft formation structure.

  9. Satellite Imaging in the Study of Pennsylvania's Environmental Issues.

    ERIC Educational Resources Information Center

    Nous, Albert P.

    This document focuses on using satellite images from space in the classroom. There are two types of environmental satellites routinely broadcasting: (1) Polar-Orbiting Operational Environmental Satellites (POES), and (2) Geostationary Operational Environmental Satellites (GOES). Imaging and visualization techniques provide students with a better…

  10. Impact of tidal density variability on orbital and reentry predictions

    NASA Astrophysics Data System (ADS)

    Leonard, J. M.; Forbes, J. M.; Born, G. H.

    2012-12-01

    Since the first satellites entered Earth orbit in the late 1950's and early 1960's, the influences of solar and geomagnetic variability on the satellite drag environment have been studied, and parameterized in empirical density models with increasing sophistication. However, only within the past 5 years has the realization emerged that "troposphere weather" contributes significantly to the "space weather" of the thermosphere, especially during solar minimum conditions. Much of the attendant variability is attributable to upward-propagating solar tides excited by latent heating due to deep tropical convection, and solar radiation absorption primarily by water vapor and ozone in the stratosphere and mesosphere, respectively. We know that this tidal spectrum significantly modifies the orbital (>200 km) and reentry (60-150 km) drag environments, and that these tidal components induce longitude variability not yet emulated in empirical density models. Yet, current requirements for improvements in orbital prediction make clear that further refinements to density models are needed. In this paper, the operational consequences of longitude-dependent tides are quantitatively assessed through a series of orbital and reentry predictions. We find that in-track prediction differences incurred by tidal effects are typically of order 200 ± 100 m for satellites in 400-km circular orbits and 15 ± 10 km for satellites in 200-km circular orbits for a 24-hour prediction. For an initial 200-km circular orbit, surface impact differences of order 15° ± 15° latitude are incurred. For operational problems with similar accuracy needs, a density model that includes a climatological representation of longitude-dependent tides should significantly reduce errors due to this source.

  11. Modern Microsurgical Resection of Olfactory Groove Meningiomas by Classical Bicoronal Subfrontal Approach without Orbital Osteotomies.

    PubMed

    Farooq, Ghulam; Rehman, Lal; Bokhari, Irum; Rizvi, Syed Raza Hussain

    2018-01-01

    The olfactory groove meningioma has always been surgically challenging. The common microscopic surgical procedures exercised involve modification of pterional or sub-frontal approaches with or without orbital osteotomies. However, we believe that orbital osteotomies are not mandatory to achieve gross total resection. Hence, this study was performed to evaluate the surgical outcomes of olfactory groove meningioma with bicoronal sub frontal approach but without orbital osteotomies. The study was performed by reviewing the medical charts, neuroimaging data, and follow-up data of 19 patients who were treated micro surgically for olfactory groove meningioma without orbital osteotomies in our department. Mean overall follow up period of our study was 5 years. Statistical analysis was done by means of IBM SPSS Software version 19. Nineteen patients (1 male and 18 female patients, with an age range of 35-67 years; average age of patients' 51±7.5 years) of OGM were managed in our department. All patients were evaluated by MRI Brain with and without Gadolinium, CTA, CT Scan both axial and Coronal sequences. Most common symptom reported was head ache (80%), others include; urinary incontinence (26%), seizures (78%), decreased visual acuity (79%), papilledema (74%), personality changes (68%) and olfactory loss was reported in 57% of the patients. Post-operative complications include; CSF accumulation (5%), hematoma at tumor bed (10%), skin infection (5%) and mild post-operative brain edema (26%). Mortality rate was 5%. During 5 years of follow-up, we recorded one recurrence which was after 26 months and successfully removed in reoperation. Bi-coronal sub frontal approach appears to be an excellent technique for Olfactory Meningioma removal as practiced by most neurosurgeons. Nevertheless, it is not mandatory to carry out orbital osteotomy to acquire optimal surgical outcome as is advocated by some Authors.

  12. From orbital debris capture systems through internal combustion engines on Mars

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The investigation and conceptualization of an orbital debris collector was the primary area of design. In addition, an alternate structural design for Space Station Freedom and systems supporting resource utilization at Mars and the moon were studied. Hardware for production of oxygen from simulate Mars atmosphere was modified to permit more reliable operation at low pressures (down to 10 mb). An internal combustion engine was altered to study how Mars atmosphere could be used as a diluent to control combustion temperatures and avoid excess Mars propellant production requirements that would result from either methane-rich or oxygen-rich, methane-oxygen combustion. An elastic loop traction system that could be used for lunar construction vehicles was refined to permit testing. A parabolic heat rejection radiator system was designed and built to determine whether it was capable of increasing heat rejection rates during lunar daytime operation. In addition, an alternate space station truss design, utilizing a pre-integrated concept, was studied and found to reduce estimate extravehicular activity (EVA) time and increase the structural integrity when compared to the original Warren truss concept. An orbital-debris-capturing spacecraft design which could be mated with the Orbital Maneuvering Vehicle was studied. The design identified Soviet C-1B boosters as the best targets of opportunity in Earth orbits between an altitude of 900 km and 1100 km and at an inclination of 82.9 deg. A dual robot pallet, which could be spun to match the tumbling rate of the C-1B booster, was developed as the conceptual design.

  13. A mission-oriented orbit design method of remote sensing satellite for region monitoring mission based on evolutionary algorithm

    NASA Astrophysics Data System (ADS)

    Shen, Xin; Zhang, Jing; Yao, Huang

    2015-12-01

    Remote sensing satellites play an increasingly prominent role in environmental monitoring and disaster rescue. Taking advantage of almost the same sunshine condition to same place and global coverage, most of these satellites are operated on the sun-synchronous orbit. However, it brings some problems inevitably, the most significant one is that the temporal resolution of sun-synchronous orbit satellite can't satisfy the demand of specific region monitoring mission. To overcome the disadvantages, two methods are exploited: the first one is to build satellite constellation which contains multiple sunsynchronous satellites, just like the CHARTER mechanism has done; the second is to design non-predetermined orbit based on the concrete mission demand. An effective method for remote sensing satellite orbit design based on multiobjective evolution algorithm is presented in this paper. Orbit design problem is converted into a multi-objective optimization problem, and a fast and elitist multi-objective genetic algorithm is utilized to solve this problem. Firstly, the demand of the mission is transformed into multiple objective functions, and the six orbit elements of the satellite are taken as genes in design space, then a simulate evolution process is performed. An optimal resolution can be obtained after specified generation via evolution operation (selection, crossover, and mutation). To examine validity of the proposed method, a case study is introduced: Orbit design of an optical satellite for regional disaster monitoring, the mission demand include both minimizing the average revisit time internal of two objectives. The simulation result shows that the solution for this mission obtained by our method meet the demand the users' demand. We can draw a conclusion that the method presented in this paper is efficient for remote sensing orbit design.

  14. Mission description and in-flight operations of ERBE instruments on ERBS and NOAA 10 spacecraft, February 1987 - February 1990

    NASA Technical Reports Server (NTRS)

    Busch, Kathryn A.; Degnan, Keith T.

    1994-01-01

    Instruments of the Earth Radiation Budget Experiment (ERBE) are operating on three different Earth-orbiting spacecraft. The Earth Radiation Budget Satellite (ERBS) is operated by the National Aeronautics and Space Administration (NASA), and the NOAA 9 and NOAA 10 weather satellites are operated by the National Oceanic and Atmospheric Administration (NOAA). This paper is the third in a series that describes the ERBE mission in-orbit environments, instrument design and operational features, and data processing and validation procedures. This paper describes the in-flight operations for the ERBE instruments aboard the ERBS and NOAA 10 spacecraft for the period from February 1987 through February 1990. Validation and archival of radiation measurements made by ERBE instruments during this period were completed in May 1992. This paper covers normal and special operations of the spacecraft and instruments, operational anomalies, and the responses of the instruments to in-orbit and seasonal variations in the solar environment.

  15. Mission Description and In-Flight Operations of ERBE Instruments on ERBS, NOAA 9, and NOAA 10 Spacecraft

    NASA Technical Reports Server (NTRS)

    Snyder, Dianne; Bush, Kathryn; Lee, Kam-Pui; Summerville, Jessica

    1998-01-01

    Instruments of the Earth Radiation Budget Experiment (ERBE) have operated on three different Earth-orbiting spacecraft. The Earth Radiation Budget Satellite (ERBS) is operated by the National Aeronautics and Space Administration (NASA), and the NOAA 9 and NOAA 10 weather satellites are operated by the National Oceanic and Atmospheric Administration (NOAA). This paper is one of a series that describes the ERBE mission, in-orbit environments, instrument design and operational features, and data processing and validation procedures. This paper also describes the in-flight operations for the ERBE nonscanner instruments aboard the ERBS, NOAA 9, and NOAA 10 spacecraft from January 1990 through December 1990. Validation and archives of radiation measurements made by ERBE nonscanner instruments during this period were completed in August 1996. This paper covers normal and special operations of the spacecraft and instruments, operational anomalies, and the responses of the instruments to in-orbit and seasonal variations in the solar environment.

  16. Orbiter Kapton wire operational requirements and experience

    NASA Technical Reports Server (NTRS)

    Peterson, R. V.

    1994-01-01

    The agenda of this presentation includes the Orbiter wire selection requirements, the Orbiter wire usage, fabrication and test requirements, typical wiring installations, Kapton wire experience, NASA Kapton wire testing, summary, and backup data.

  17. Multi-sun-synchronous (MSS) orbits for earth observation

    NASA Astrophysics Data System (ADS)

    Ulivieri, Carlo; Anselmo, Luciano

    1992-08-01

    A case study is outlined for a remote-sensing mission at low and middle latitudes based on multi-sun-synchronous (MSS) orbits. The scenario involves the use of small payloads in low-earth posigrade orbits that would overfly the Mediterranean region. A 600-kg spacecraft is considered in an orbit that is 571 km in altitude and at an inclination of 42.5 deg. The orbit is analyzed in terms of mission characteristics, and two years of operation is shown to be feasible with a fuel-consumption rate of less than three kg/yr of hydrazine. The mission could be based on the use of a Scout solid-propellant rockets into an MSS orbit, and only a limited number of ground stations are required for good data collection. A remote-sensing mission at low/middle latitudes is shown to be efficient in terms of both revisit frequency, fuel consumption, and data acquisition.

  18. Optimization of constellation jettisoning regards to short term collision risks

    NASA Astrophysics Data System (ADS)

    Handschuh, D.-DA.-A.; Bourgeois, E.

    2018-04-01

    The space debris problematic is directly linked to the in-orbit collision risk between artificial satellites. With the increase of the space constellation projects, a multiplication of multi-payload launches should occur. In the specific cases where many satellites are injected into orbit with the same launcher upper stage, all these objects will be placed on similar orbits, very close one from each other, at a specific moment where their control capabilities will be very limited. Under this hypothesis, it is up to the launcher operator to ensure that the simultaneous in-orbit injection is safe enough to guarantee the non-collision risk between all the objects under a ballistic hypothesis eventually considering appropriate uncertainties. The purpose of the present study is to find optimized safe separation conditions to limit the in-orbit collision risk following the injection of many objects on very close orbits in a short-delay mission.

  19. ESOC activities during the MIR de-orbit

    NASA Astrophysics Data System (ADS)

    Klinkrad, H.; Flury, W.; Hernández, C.; Landgraf, M.; Jehn, R.; Christ, U.; Sintoni, F.

    2002-11-01

    On March 23, 2001, MIR was de-orbited in a controlled fashion, following a successful mission of 15 years. The de-orbiting operations were conducted by the TsUP Mission Control Center, who also consulted entities outside Russia, in order to consolidate their knowledge on the MIR orbit and attitude prior to the initiation of the de-orbit sequence. The European Space Agency ESA through their operations centre ESOC was tasked to support the pre-entry analysis of TsUP by own results, and by routing of Russian and European data via a dedicated communications network. Analysis results produced by ESOC, and details on the data exchange will be highlighted in this paper. The MIR de-orbit and its assessed risk potential will also be compared with the re-entries of Skylab and Salyut-7/Kosmos-1686.

  20. ESA CAMELOT study: Challenges in future operational missions for GMES atmospheric monitoring, sentinel 4 and 5

    NASA Astrophysics Data System (ADS)

    Levelt, P.; Veefkind, P.

    2009-04-01

    Dedicated atmospheric chemistry observations from space have been made for over 30 years now, starting with the SBUV and TOMS measurements of the ozone layer. Since then huge progress has been made, improving the accuracy of the measurements, extending the amount of constituents, and by sensing not only the stratosphere, but the last five to ten years also the troposphere. The potential to operational monitor the atmosphere, following the meteorological community, came within reach. At the same time, the importance for society of regular operational environmental measurements, related to the ozone layer, air quality and climate change, became apparent, amongst others resulting in the EU initiative Global Monitoring for Environment and Security (GMES) In order to prepare the operational missions in the context of the GMES, ESA took the initiative to further study the user requirements for the Sentinel 4 and 5 (precursor) missions. The Sentinel 4 and 5 (precursor) missions are dedicated operational missions to monitor the atmospheric composition in the 2013-2020 timeframe and onward. The user requirements for the sentinel missions focus on monitoring the atmosphere from an environmental point of view (ozone layer, air quality and climate). ESA's CAMELOT (Composition of the Atmospheric Mission concEpts and SentineL Observation Techniques) study is the follow-on study to ESA's CAPACITY study finished in 2005. The general objective of the CAMELOT study is to further contribute to the definition of the air quality and climate protocol monitoring parts of the GMES Sentinel 4 and 5 missions. Key issues in the CAMELOT study are: • trade-offs between different observation strategies (spectral ranges, polarisation, direction etc) for aerosols and several trace gases • a quantitative assessment of the requirements for spatio-temporal sampling taking into account the contamination of nadir-viewing observations by cloud • optimising several orbit scenario's (leo, inclined leo, geo or any combination) and a contribution from the user's perspective to the trade-off between different orbits. In order to address these issues a large European consortium, lead by KNMI, has been formed by 9 European institutes (KNMI, RAL, U.Leicester, SRON, FMI, BIRA-IASB, CNR-IFAC,NOVELTIS and RIU-U.Koeln). In the presentation an overview will be given of the CAMELOT study, including specific results for combined retrievals, cloud statistics for different orbit geometries and retrievals for several orbit scenarios.

  1. Telerobotic workstation design aid

    NASA Technical Reports Server (NTRS)

    Corker, K.; Hudlicka, E.; Young, D.; Cramer, N.

    1989-01-01

    Telerobot systems are being developed to support a number of space mission applications. In low earth orbit, telerobots and teleoperated manipulators will be used in shuttle operations and space station construction/maintenance. Free flying telerobotic service vehicles will be used at low and geosynchronous orbital operations. Rovers and autonomous vehicles will be equipped with telerobotic devices in planetary exploration. In all of these systems, human operators will interact with the robot system at varied levels during the scheduled operations. The human operators may be in either orbital or ground-based control systems. To assure integrated system development and maximum utility across these systems, designers must be sensitive to the constraints and capabilities that the human brings to system operation and must be assisted in applying these human factors to system development. The simulation and analysis system is intended to serve the needs of system analysis/designers as an integrated workstation in support of telerobotic design.

  2. Earth observation mission operation of COMS during in-orbit test

    NASA Astrophysics Data System (ADS)

    Cho, Young-Min

    2011-11-01

    Communication Ocean Meteorological Satellite (COMS) for the hybrid mission of meteorological observation, ocean monitoring, and telecommunication service was launched onto Geostationary Earth Orbit on June 27, 2010 and it is currently under normal operation service after the In-Orbit Test (IOT) phase. The COMS is located on 128.2° East of the geostationary orbit. In order to perform the three missions, the COMS has 3 separate payloads, the meteorological imager (MI), the Geostationary Ocean Color Imager (GOCI), and the Ka-band antenna. Each payload is dedicated to one of the three missions, respectively. The MI and GOCI perform the Earth observation mission of meteorological observation and ocean monitoring, respectively. During the IOT phase the functionality and the performance of many aspects of the COMS satellite and ground station have been checked through the Earth observation mission operation for the observation of the meteorological phenomenon over several areas of the Earth and the monitoring of marine environments around the Korean peninsula. The Earth observation mission operation of COMS during the IOT phase is introduced in terms of mission operation characteristics, mission planning, and mission operation results for the missions of meteorological observation and ocean monitoring, respectively.

  3. Oxygen Generation System Laptop Bus Controller Flight Software

    NASA Technical Reports Server (NTRS)

    Rowe, Chad; Panter, Donna

    2009-01-01

    The Oxygen Generation System Laptop Bus Controller Flight Software was developed to allow the International Space Station (ISS) program to activate specific components of the Oxygen Generation System (OGS) to perform a checkout of key hardware operation in a microgravity environment, as well as to perform preventative maintenance operations of system valves during a long period of what would otherwise be hardware dormancy. The software provides direct connectivity to the OGS Firmware Controller with pre-programmed tasks operated by on-orbit astronauts to exercise OGS valves and motors. The software is used to manipulate the pump, separator, and valves to alleviate the concerns of hardware problems due to long-term inactivity and to allow for operational verification of microgravity-sensitive components early enough so that, if problems are found, they can be addressed before the hardware is required for operation on-orbit. The decision was made to use existing on-orbit IBM ThinkPad A31p laptops and MIL-STD-1553B interface cards as the hardware configuration. The software at the time of this reporting was developed and tested for use under the Windows 2000 Professional operating system to ensure compatibility with the existing on-orbit computer systems.

  4. Testing and evaluation for astronaut extravehicular activity (EVA) operability.

    PubMed

    Shields, N; King, L C

    1998-09-01

    Because it is the human component that defines space mission success, careful planning is required to ensure that hardware can be operated and maintained by crews on-orbit. Several methods exist to allow researchers and designers to better predict how hardware designs will behave under the harsh environment of low Earth orbit, and whether designs incorporate the necessary features for Extra Vehicular Activity (EVA) operability. Testing under conditions of simulated microgravity can occur during the design concept phase when verifying design operability, during mission training, or concurrently with on-orbit mission operations. The bulk of testing is focused on normal operations, but also includes evaluation of credible mission contingencies or "what would happen if" planning. The astronauts and cosmonauts who fly these space missions are well prepared and trained to survive and be productive in Earth's orbit. The engineers, designers, and training crews involved in space missions subject themselves to Earth based simulation techniques that also expose them to extreme environments. Aircraft falling ten thousand feet, alternating g-loads, underwater testing at 45 foot depth, enclosure in a vacuum chamber and subject to thermal extremes, each carries with it inherent risks to the humans preparing for space missions.

  5. Electronic spectrum of the UO and UO(+) molecules.

    PubMed

    Tyagi, Rajni; Zhang, Zhiyong; Pitzer, Russell M

    2014-12-18

    Electronic theory calculations are applied to the study of the UO molecule and the UO(+) ion. Relativistic effective core potentials are used along with the accompanying valence spin-orbit operators. Polarized double-ς and triple-ς basis sets are used. Molecular orbitals are obtained from state-averaged multiconfiguration self-consistent field calculations and then used in multireference spin-orbit configuration interaction calculations with a number of millions of terms. The ground state of UO has open shells of 5f(3)7s(1), angular momentum Ω = 4, and a spin-orbit-induced avoided crossing near the equilibrium internuclear distance. Many UO excited states are studied with rotational constants, intensities, and experimental comparisons. The ground state of UO(+) is of 5f(3) nature with Ω = 9/2. Many UO(+) excited states are also studied. The open-shell nature of both UO and UO(+) leads to many low-lying excited states.

  6. Symmetry properties of the configuration interaction space in relation to one- and two-particle operators: The splitting theorem

    NASA Astrophysics Data System (ADS)

    Živković, Tomislav P.

    1984-09-01

    The configuration interaction (CI) space Xn built upon n electrons moving over 2n orthonormalized orbitals χi is considered. It is shown that the space Xn splits into two complementary subspaces X+n and X-n having special properties: each state Ψ+∈X+n and Ψ-∈X-n is ``alternantlike'' in the sense that it has a uniform charge density distribution over all orbitals χi and vanishing bond-orders between all orbitals of the same parity. In addition, matrix elements Γ(ij;kl) of a two-particle density matrix vanish whenever four distinct orbitals are involved and there is an odd number of orbitals of the same parity. Further, Γ(ij;lj)=γ(il)/4 ( j≠i,l), whenever (i) and (l) are of different parity. This last relation shows the connection between a two-particle (Γ) and a one-particle (γ) density matrix. ``Elementary'' alternant and antialternant operators are identified. These operators connect either only the states in the same subspace, or only the states in different subspaces, and each one- and two-particle symmetric operator can be represented by their linear combination. Alternant Hamiltonians, which can be represented as linear combinations of elementary alternant operators, have alternantlike eigenstates. It is also shown that each symmetric Hamiltonian possessing alternantlike eigenstates can be represented as such a linear combination. In particular, the PPP Hamiltonian describing an alternant hydrocarbon system is such a case. Complementary subspaces X+n and X-n can be explicitly constructed using the so-called regular resonance structures (RRS's) which are normalized determinants containing mutually disjunct bond orbitals. Expressions for the derivation of matrix elements of one- and two-particle operators between different RRS's are also derived.

  7. Preliminary concepts for a solar electric orbit raising experiment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cohen, R.B.; Penn, J.P.; Janson, S.W.

    1989-01-01

    Some preliminary concepts for a solar electric orbit raising demonstration that will show technological readiness for the development of operational Electric Orbital Transfer Vehicles (EOTVs) are outlined. These ideas could serve as a template for the proposed Electric Insertion Transfer Experiment (ELITE). At this moment, ELITE is not a funded program. Concepts are presented for a solar electric orbit raising demonstration, for ELITE, and for the path from the proposed ELITE to a future operational EOTV. A brief discussion of the benefits to be derived from the use of EOTVs, the conceptual organization of the ELITE team, the key technologiesmore » for EOTV and ELITE, and some preliminary options for the orbit raising vehicle and representative missions are provided.« less

  8. Lunar orbital mass spectrometer experiment

    NASA Technical Reports Server (NTRS)

    Lord, W. P.

    1971-01-01

    The design, development, manufacture, test and calibration of five lunar orbital mass spectrometers with the four associated ground support equipment test sets are discussed. A mass spectrometer was installed in the Apollo 15 and one in the Apollo 16 Scientific Instrument Module within the Service Module. The Apollo 15 mass spectrometer was operated with collection of 38 hours of mass spectra data during lunar orbit and 50 hours of data were collected during transearth coast. The Apollo 16 mass spectrometer was operated with collection of 76 hours of mass spectra data during lunar orbit. However, the Apollo 16 mass spectrometer was ejected into lunar orbit upon malfunction of spacecraft boom system just prior to transearth insection and no transearth coast data was possible.

  9. Hand controller commonality evaluation process

    NASA Technical Reports Server (NTRS)

    Stuart, Mark A.; Bierschwale, John M.; Wilmington, Robert P.; Adam, Susan C.; Diaz, Manuel F.; Jensen, Dean G.

    1993-01-01

    Hand controller selection for NASA's Orbiter and Space Station Freedom is an important area of human-telerobot interface design and evaluation. These input devices will control remotely operated systems that include large crane-like manipulators (e.g., Remote Manipulator System or RMS), smaller, more dexterous manipulators (e.g., Flight Telerobotic Servicer or FTS), and free flyers (e.g., Orbital Maneuvering Vehicle or OMV). Candidate hand controller configurations for these systems vary in many ways: shape, size, number of degrees-of-freedom (DOF), operating modes, provision of force reflection, range of movement, and 'naturalness' of use. Unresolved design implementation issues remain, including such topics as how the current Orbiter RMS rotational and translational rate hand controllers compare with the proposed Space Station Freedom hand controllers, the advantages that position hand controllers offer for these applications, and whether separate hand controller configurations are required for each application. Since previous studies contain little empirical hand controller task performance data, a controlled study is needed that tests Space Station Freedom candidate hand controllers during representative tasks. This study also needs to include anthropometric and biomechanical considerations.

  10. Orbital assembly and maintenance study

    NASA Technical Reports Server (NTRS)

    Gorman, D.; Grant, C.; Kyrias, G.; Lord, C.; Rombach, J.; Salis, M.; Skidmore, R.; Thomas, R.

    1975-01-01

    The requirements, conceptual design, tradeoffs, procedures, and techniques for orbital assembly of the support structure of the microwave power transmission system and the radio astronomy telescope are described. Thermal and stress analyses, packaging, alignment, and subsystems requirements are included along with manned vs. automated and transportation tradeoffs. Technical and operational concepts for the manned and automated maintenance of satellites were investigated and further developed results are presented.

  11. CASSINI. Report on the Phase A study: Saturn Orbiter and Titan probe

    NASA Technical Reports Server (NTRS)

    1988-01-01

    An in-depth, second phase exploration of Saturn is proposed. The scientific objectives involving Titan, Saturn's rings, icy satellites, magnetosphere, Jupiter, asteroids, and cruise science are covered. Other topics presented include: (1) the model payloads; (2) project requirements; (3) mission; (4) launch vehicle; (5) the orbiter system; (6) the Titan probe system; (7) mission operations; (8) management; and (9) development plan.

  12. Coordination of Mars Express and Beagle2 Mission Operations

    NASA Astrophysics Data System (ADS)

    Trautner, R.; Chicarro, A.; Martin, P.

    The Mars Express orbiter carrying the British Beagle 2 lander will arrive at Mars late 2003. The evaluation of science data from both the MEX orbiter and the lander will benefit from coordinated measurements obtained by the instrument sets on each space- craft. Furthermore, data obtained during the early mission of one spacecraft should be taken into account for the science operations planning of the other spacecraft in order to optimize the scientific return. Based on the capabilities and goals of the scientific instruments on both platforms, possible areas of cooperation are proposed. The flex- ibility required in mission operations planning for both the orbiter and the lander are assessed, and the expected benefits of coordinated operations are explained.

  13. Force Modeling and State Propagation for Navigation and Maneuver Planning for the Proximity Operations Nano-Satellite Flight Demonstration Mission

    NASA Astrophysics Data System (ADS)

    Roscoe, C.; Griesbach, J.; Westphal, J.; Hawes, D.; Carrico, J.

    2013-09-01

    The state propagation accuracy resulting from different choices of gravitational force models and orbital perturbations is investigated for a pair of CubeSats flying in formation in low Earth orbit (LEO). Accurate on-board state propagation is necessary to autonomously plan maneuvers and perform proximity operations and docking safely. The ability to perform high-precision navigation is made especially challenging by the limited computer processing power available on-board the spacecraft. Propagation accuracy is investigated both in terms of the absolute (chief) state and the relative (deputy relative to chief) state. Different perturbing effects are quantified and related directly to important mission factors such as maneuver accuracy, fuel use (mission lifetime), and collision prediction/avoidance (mission safety). The Proximity Operations Nano-Satellite Flight Demonstration (PONSFD) program is to demonstrate rendezvous proximity operations (RPO), formation flying, and docking with a pair of 3U CubeSats. The program is sponsored by NASA Ames via the Office of the Chief Technologist (OCT) in support of its Small Spacecraft Technology Program (SSTP). The goal of the mission is to demonstrate complex RPO and docking operations with a pair of low-cost 3U CubeSat satellites using passive navigation sensors. The primary orbital perturbation affecting spacecraft in low Earth orbit (LEO) is the Earth oblateness, or J2, perturbation. Provided that a spacecraft does not have an extremely high area-to-mass ratio or is not flying at a very low altitude, the effect of J2 will usually be greater than that of atmospheric drag, which will typically be the next largest perturbing force in LEO. After these perturbations, factors such as higher-order Earth gravitational parameters, third-body perturbations, and solar radiation pressure will follow in magnitude but will have much less noticeable effects than J2 and drag. For spacecraft formations, where relative dynamics and not absolute dynamics are of primary importance, J2 will still be significant but drag effects become highly dependent on differences in the ballistic coefficients of the spacecraft in the formation. The PONSFD program uses a pair of 3U CubeSats with protruding solar panels, which means that inertial attitude differences between the two spacecraft will result in large differences in presented cross-sectional area. However, on-board prediction of drag effects may not be practical in all circumstances because it requires accurate knowledge of the Earth's atmospheric density as well as of the attitude of both spacecraft. This paper investigates the accuracy of performing long-term state propagation using different choices of gravitational force models and orbital perturbations for a wide range of orbit altitude and inclination possibilities. Propagation accuracy is affected by a number of orbit parameters and force model parameters which makes performing such a study with uncertain orbit knowledge a challenging prospect. However, much intuition can be gained by breaking the study down in terms of each of these parameters to see the effect of each one individually. The results of this study will be used to select a propagation method for the on-board navigation system for the mission.

  14. Mission description and in-flight operations of ERBE instruments on ERBS, NOAA 9, and NOAA 10 spacecraft

    NASA Technical Reports Server (NTRS)

    Weaver, William L.; Bush, Kathryn A.; Degnan, Keith T.; Howerton, Clayton E.; Tolson, Carol J.

    1992-01-01

    Instruments of the Earth Radiation Budget Experiment (ERBE) are operating on three different Earth-orbiting spacecraft. The Earth Radiation Budget Satellite (ERBS) is operated by NASA, and NOAA 9 and NOAA 10 weather satellites are operated by the National Oceanic and Atmospheric Administration (NOAA). This paper is the second in a series that describes the ERBE mission, and data processing and validation procedures. This paper describes the spacecraft and instrument operations for the second full year of in-orbit operations, which extend from February 1986 through January 1987. Validation and archival of radiation measurements made by ERBE instruments during this second year of operation were completed in July 1991. This period includes the only time, November 1986 through January 1987, during which all ERBE instruments aboard the ERBE, NOAA 9, and NOAA 10 spacecraft were simultaneously operational. This paper covers normal and special operations of the spacecraft and instruments, operational anomalies, and the responses of the instruments to in-orbit and seasonal variations in the solar environment.

  15. Neurovestibular Considerations for Sub-Orbital Space Flight: A Framework for Future Investigation

    PubMed Central

    Karmali, Faisal; Shelhamer, Mark

    2013-01-01

    Commercial sub-orbital operators will soon offer the excitement of traveling to space to thousands of people. Based on previous experience in space flight and parabolic flight, sensorimotor disruptions in eye movements, postural stability, and motor coordination are likely in these travelers. Here we propose a framework for developing strategies to overcome these sensorimotor disruptions. We delineate how approaches should differ from those applied to orbital flight and between sub-orbital passengers and pilots based on differing frequency of flights and mission objectives. Sensorimotor adaptation is one strategy for overcoming disruptions; an important question is whether it occurs quickly enough to be of use during periods of reduced and enhanced gravity lasting less than five minutes. Data are presented showing that sensorimotor adaptation of the pitch vestibulo-ocular reflex during parabolic flight takes a few consecutive days of flying to overcome an initial disruption. We conclude with recommendations for operators and researchers to improve safety and comfort during sub-orbital operations. We recommend using parabolic flight as a tool for pre-adapting sub-orbital passengers, along with further research into the required quantity and timing of these pre-adaptation flights and the tasks conducted during these flights. Likewise, for sub-orbital pilots, we recommend emphasizing recency of experience. PMID:20555165

  16. The Landsat Data Continuity Mission Operational Land Imager (OLI) Radiometric Calibration

    NASA Technical Reports Server (NTRS)

    Markham, Brian L.; Dabney, Philip W.; Murphy-Morris, Jeanine E.; Knight, Edward J.; Kvaran, Geir; Barsi, Julia A.

    2010-01-01

    The Operational Land Imager (OLI) on the Landsat Data Continuity Mission (LDCM) has a comprehensive radiometric characterization and calibration program beginning with the instrument design, and extending through integration and test, on-orbit operations and science data processing. Key instrument design features for radiometric calibration include dual solar diffusers and multi-lamped on-board calibrators. The radiometric calibration transfer procedure from NIST standards has multiple checks on the radiometric scale throughout the process and uses a heliostat as part of the transfer to orbit of the radiometric calibration. On-orbit lunar imaging will be used to track the instruments stability and side slither maneuvers will be used in addition to the solar diffuser to flat field across the thousands of detectors per band. A Calibration Validation Team is continuously involved in the process from design to operations. This team uses an Image Assessment System (IAS), part of the ground system to characterize and calibrate the on-orbit data.

  17. Investigation of electrodynamic stabilization and control of long orbiting tethers

    NASA Technical Reports Server (NTRS)

    Colombo, G.; Arnold, D.

    1984-01-01

    The state-of-the-art in tether modelling among participants in the Tethered Satellite System (TSS) Program, the slack tether and its behavior, and certain advanced applications of the tether to problems in orbital mechanics are identified. The features and applications of the TSS software set are reviewed. Modelling the slack tether analytically with as many as 50 mass points and the application of this new model to a study of the behavior of a broken tether near the Shuttle are described. A reel control algorithm developed by SAO and examples of its use are described, including an example which also demonstrates the use of the tether in transferring a heavy payload from a low-orbiting Shuttle to a high circular orbit. Capture of a low-orbiting payload by a Space Station in high circular orbit is described. Energy transfer within a dumbbell-type spacecraft by cyclical reeling operations or gravitational effects on the natural elasticity of the connecting tether, it is shown, can circularize the orbit of the spacecraft.

  18. Surgical decompression in endocrine orbitopathy. Visual evoked potential evaluation and effect on the optic nerve.

    PubMed

    Clauser, Luigi C; Tieghi, Riccardo; Galie', Manlio; Franco, Filippo; Carinci, Francesco

    2012-10-01

    Endocrine orbitopathy (EO) represents the most frequent and important extrathyroidal stigma of Graves disease. This chronic autoimmune condition involves the orbital contents, including extraocular muscles, periorbital connective-fatty tissue and lacrimal gland. The increase of fat tissue and the enlargement of extraocular muscles within the bony confines of the orbit leads to proptosis, and in the most severe cases optic neuropathy, caused by compression and stretching of the optic nerve. The congestion and the pressure of the enlarged muscles, constrict the nerve and can lead to reduced sight or loss of vision with the so called "orbital apex syndrome". Generally surgical treatment of EO, based on fat and/or orbital wall expansion, is possible and effective in improving exophthalmos and diplopia. Since there are limited reports focussing on optic neuropathy recovery after fat and/or orbital walls decompression the Authors decided to perform a retrospective analysis on a series of patients affected by EO. The study population was composed of 10 patients affected by EO and presenting to the Unit of Cranio Maxillofacial Surgery, Center for Craniofacial Deformities & Orbital Surgery St. Anna Hospital and University, Ferrara, Italy, for evaluation and treatment. A complete Visual Evoked Potentials (VEP) evaluation was performed. There were seven women and three men with a median age of 55 years. Optic nerve VEP amplitude and latency were recorded as normal or pathological. Abnormal results were scored as moderate, mild and severe. Differences in VEP pre and post-operatively were recorded as present or absent (i.e. VEP Delta). Pearson chi square test was applied. There were 20 operated orbits. The first VEP evaluation was performed 3.2 months before surgery and post-operative VEP control was done after a mean of 18.7 months. Fat decompression was performed in all cases and eight patients had also bony decompression. VEP amplitude and latency were affected in 10 and 15 cases before operation and six and nine after surgery, respectively. VEP amplitude and latency significantly improved after orbital decompression. Fat and orbital wall decompression are of paramount importance not only to improve exophthalmos and diplopia in patients affected by EO but also as rescue surgery for severe cases where optic neuropathy caused by stretching of the optical nerve is detected by VEP. Imaging and functional nerve evaluation are mandatory in all cases of EO. Copyright © 2012 European Association for Cranio-Maxillo-Facial Surgery. Published by Elsevier Ltd. All rights reserved.

  19. KSC-08pd3887

    NASA Image and Video Library

    2008-11-30

    EDWARDS, Calif. – Against a setting sun, space shuttle Endeavour undergoes recovery operations on Edwards Air Force Base in California after its landing. The orbiter convoy normally begins recovery operations in earnest about two hours before the shuttle is scheduled to land. Specially designed vehicles or units and a team of trained personnel “safe” the orbiter and prepare it for towing. Purge and Coolant Umbilical Access Vehicles are moved into position behind the orbiter to get access to the umbilical areas. The flight crew is replaced aboard the orbiter by exchange sup¬port personnel who prepare the orbiter for ground tow operations, install switch guards and remove data packages from any onboard experiments. After a total safety downgrade, vehicle ground personnel make numerous preparations for the towing operation, including install¬ing landing gear lock pins, disconnecting the nose landing gear drag link, positioning the towing vehicle in front of the orbiter and connecting the tow bar. The decision to land Endeavour at Edwards was made due to weather concerns at NASA's Kennedy Space Center in Florida. In the 52nd landing at Edwards, Endeavour touched down at 4:25 p.m. EST to end the STS-126 mission, completing its 16-day journey of more than 6.6 million miles in space. Endeavour will be returned to Kennedy atop a Shuttle Carrier Aircraft, or SCA, a modified Boeing 747 jetliner. Photo credit: NASA/Tony Landis, VAFB

  20. KSC-08pd3888

    NASA Image and Video Library

    2008-11-30

    EDWARDS, Calif. – Against a setting sun, space shuttle Endeavour undergoes recovery operations on Edwards Air Force Base in California after its landing. The orbiter convoy normally begins recovery operations in earnest about two hours before the shuttle is scheduled to land. Specially designed vehicles or units and a team of trained personnel “safe” the orbiter and prepare it for towing. Purge and Coolant Umbilical Access Vehicles are moved into position behind the orbiter to get access to the umbilical areas. The flight crew is replaced aboard the orbiter by exchange sup¬port personnel who prepare the orbiter for ground tow operations, install switch guards and remove data packages from any onboard experiments. After a total safety downgrade, vehicle ground personnel make numerous preparations for the towing operation, including install¬ing landing gear lock pins, disconnecting the nose landing gear drag link, positioning the towing vehicle in front of the orbiter and connecting the tow bar. The decision to land Endeavour at Edwards was made due to weather concerns at NASA's Kennedy Space Center in Florida. In the 52nd landing at Edwards, Endeavour touched down at 4:25 p.m. EST to end the STS-126 mission, completing its 16-day journey of more than 6.6 million miles in space. Endeavour will be returned to Kennedy atop a Shuttle Carrier Aircraft, or SCA, a modified Boeing 747 jetliner. Photo credit: NASA/Tony Landis, VAFB

  1. KSC-08pd3885

    NASA Image and Video Library

    2008-11-30

    EDWARDS, Calif. – On Edwards Air Force Base in California, space shuttle Endeavour undergoes recovery operations after its landing. The orbiter convoy normally begins recovery operations in earnest about two hours before the shuttle is scheduled to land. Specially designed vehicles or units and a team of trained personnel “safe” the orbiter and prepare it for towing. Purge and Coolant Umbilical Access Vehicles are moved into position behind the orbiter to get access to the umbilical areas. The flight crew is replaced aboard the orbiter by exchange sup¬port personnel who prepare the orbiter for ground tow operations, install switch guards and remove data packages from any onboard experiments. After a total safety downgrade, vehicle ground personnel make numerous preparations for the towing operation, including install¬ing landing gear lock pins, disconnecting the nose landing gear drag link, positioning the towing vehicle in front of the orbiter and connecting the tow bar. The decision to land Endeavour at Edwards was made due to weather concerns at NASA's Kennedy Space Center in Florida. In the 52nd landing at Edwards, Endeavour touched down at 4:25 p.m. EST to end the STS-126 mission, completing its 16-day journey of more than 6.6 million miles in space. Endeavour will be returned to Kennedy atop a Shuttle Carrier Aircraft, or SCA, a modified Boeing 747 jetliner. Photo credit: NASA/Tony Landis, VAFB

  2. KSC-08pd3886

    NASA Image and Video Library

    2008-11-30

    EDWARDS, Calif. – On Edwards Air Force Base in California, space shuttle Endeavour undergoes recovery operations after its landing. The orbiter convoy normally begins recovery operations in earnest about two hours before the shuttle is scheduled to land. Specially designed vehicles or units and a team of trained personnel “safe” the orbiter and prepare it for towing. Purge and Coolant Umbilical Access Vehicles are moved into position behind the orbiter to get access to the umbilical areas. The flight crew is replaced aboard the orbiter by exchange sup¬port personnel who prepare the orbiter for ground tow operations, install switch guards and remove data packages from any onboard experiments. After a total safety downgrade, vehicle ground personnel make numerous preparations for the towing operation, including install¬ing landing gear lock pins, disconnecting the nose landing gear drag link, positioning the towing vehicle in front of the orbiter and connecting the tow bar. The decision to land Endeavour at Edwards was made due to weather concerns at NASA's Kennedy Space Center in Florida. In the 52nd landing at Edwards, Endeavour touched down at 4:25 p.m. EST to end the STS-126 mission, completing its 16-day journey of more than 6.6 million miles in space. Endeavour will be returned to Kennedy atop a Shuttle Carrier Aircraft, or SCA, a modified Boeing 747 jetliner. Photo credit: NASA/Tony Landis, VAFB

  3. Mission operations for unmanned nuclear electric propulsion outer planet exploration with a thermionic reactor spacecraft.

    NASA Technical Reports Server (NTRS)

    Spera, R. J.; Prickett, W. Z.; Garate, J. A.; Firth, W. L.

    1971-01-01

    Mission operations are presented for comet rendezvous and outer planet exploration NEP spacecraft employing in-core thermionic reactors for electric power generation. The selected reference missions are the Comet Halley rendezvous and a Jupiter orbiter at 5.9 planet radii, the orbit of the moon Io. The characteristics of the baseline multi-mission NEP spacecraft are presented and its performance in other outer planet missions, such as Saturn and Uranus orbiters and a Neptune flyby, are discussed. Candidate mission operations are defined from spacecraft assembly to mission completion. Pre-launch operations are identified. Shuttle launch and subsequent injection to earth escape by the Centaur D-1T are discussed, as well as power plant startup and the heliocentric mission phases. The sequence and type of operations are basically identical for all missions investigated.

  4. Satellite Power Systems (SPS) concept definition study. Volume 4: Transportation analysis

    NASA Technical Reports Server (NTRS)

    Hanley, G. M.

    1980-01-01

    Transportation system elements were synthesized and evaluated on the basis of their potential to satisfy overall satellite (SPS) transportation requirements and of their sensitivities, interfaces, and impact on the SPS. Additional analyses and investigations were conducted to further define transportation system concepts that will be needed for the developmental and operational phases of an SPS program. To accomplish these objectives, transportation systems such as shuttle and its derivatives have been identified; new heavy lift launch vehicle concepts, cargo and personnel orbital transfer vehicles and intra-orbit transfer vehicle concepts have been evaluated. To a limited degree, the program implications of their operations and costs were assessed. The results of these analyses have been integrated into other elements of the overall SPS concept definition studies.

  5. Earth orbital teleoperator systems evaluation

    NASA Technical Reports Server (NTRS)

    Shields, N. L., Jr.; Slaughter, P. H.; Brye, R. G.; Henderson, D. E.

    1979-01-01

    The mechanical extension of the human operator to remote and specialized environments poses a series of complex operational questions. A technical and scientific team was organized to investigate these questions through conducting specific laboratory and analytical studies. The intent of the studies was to determine the human operator requirements for remotely manned systems and to determine the particular effects that various system parameters have on human operator performance. In so doing, certain design criteria based on empirically derived data concerning the ultimate control system, the human operator, were added to the Teleoperator Development Program.

  6. Electronic orbital response of regular extended and infinite periodic systems to magnetic fields. I. Theoretical foundations for static case

    NASA Astrophysics Data System (ADS)

    Springborg, Michael; Molayem, Mohammad; Kirtman, Bernard

    2017-09-01

    A theoretical treatment for the orbital response of an infinite, periodic system to a static, homogeneous, magnetic field is presented. It is assumed that the system of interest has an energy gap separating occupied and unoccupied orbitals and a zero Chern number. In contrast to earlier studies, we do not utilize a perturbation expansion, although we do assume the field is sufficiently weak that the occurrence of Landau levels can be ignored. The theory is developed by analyzing results for large, finite systems and also by comparing with the analogous treatment of an electrostatic field. The resulting many-electron Hamilton operator is forced to be hermitian, but hermiticity is not preserved, in general, for the subsequently derived single-particle operators that determine the electronic orbitals. However, we demonstrate that when focusing on the canonical solutions to the single-particle equations, hermiticity is preserved. The issue of gauge-origin dependence of approximate solutions is addressed. Our approach is compared with several previously proposed treatments, whereby limitations in some of the latter are identified.

  7. Operating Small Sat Swarms as a Single Entity: Introducing SODA

    NASA Technical Reports Server (NTRS)

    Conn, Tracie; Plice, Laura; Dono Perez, Andres; Ho, Michael

    2017-01-01

    NASA's decadal survey determined that simultaneous measurements from a 3D volume of space are advantageous for a variety of studies in space physics and Earth science. Therefore, swarm concepts with multiple spacecraft in close proximity are a growing topic of interest in the small satellite community. Among the capabilities needed for swarm missions is a means to maintain operator-specified geometry, alignment, or separation. Swarm stationkeeping poses a planning challenge due to the limited scalability of ground resources. To address scalable control of orbital dynamics, we introduce SODA - Swarm Orbital Dynamics Advisor - a tool that accepts high-level configuration commands and provides the orbital maneuvers needed to achieve the desired type of swarm relative motion. Rather than conventional path planning, SODA's innovation is the use of artificial potential functions to define boundaries and keepout regions. The software architecture includes high fidelity propagation, accommodates manual or automated inputs, displays motion animations, and returns maneuver commands and analytical results. Currently, two swarm types are enabled: in-train distribution and an ellipsoid volume container. Additional swarm types, simulation applications, and orbital destinations are in planning stages.

  8. SPS Beam Steering for LHC Extraction

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gianfelice-Wendt, Eliana; Bartosik, Hannes; Cornelis, Karel

    2014-07-01

    The CERN Super Proton Synchrotron accelerates beams for the Large Hadron Collider to 450 GeV. In addition it produces beams for fixed target facilities which adds complexity to the SPS operation. During the run 2012-2013 drifts of the extracted beam trajectories have been observed and lengthy optimizations in the transfer lines were performed to reduce particle losses in the LHC. The observed trajectory drifts are consistent with the measured SPS orbit drifts at extraction. While extensive studies are going on to understand, and possibly suppress, the source of such SPS orbit drifts the feasibility of an automatic beam steering towardsmore » a “golden” orbit at the extraction septa, by means of the interlocked correctors, is also being investigated. The challenges and constraints related to the implementation of such a correction in the SPS are described. Simulation results are presented and a possible operational steering strategy is proposed.« less

  9. [Medpor plus titanic mesh implant in the repair of orbital blowout fractures].

    PubMed

    Han, Xiao-hui; Zhang, Jia-yu; Cai, Jian-qiu; Shi, Ming-guang

    2011-05-10

    To study the efficacy of porous polyethylene (Medpor) plus titanic mesh sheets in the repair of orbital blowout fractures. A total of 20 patients underwent open surgical reduction with the combined usage of Medpor and titanic mesh. And they were followed up for average period of 14.5 months (range: 9 - 18). There is no infection or extrusion of medpor and titanic mesh in follow-up periods. There was no instance of decreased visual acuity at post-operation. And all cases of enophthalmos were corrected. The post-operative protrusion degree of both eyes was almost identical at less than 2 mm. The movement of eye balls was satisfactory in all directions. Diplopia disappeared in 18 cases with a cure rate of 90%, 1 case improved and 1 case persisted. Medpor plus titanic mesh implant is a safe and effective treatment in the repair of orbital blow out fractures.

  10. TROPIX: A solar electric propulsion flight experiment

    NASA Technical Reports Server (NTRS)

    Hickman, J. Mark; Hillard, G. Barry; Oleson, Steven R.

    1993-01-01

    The Transfer Orbit Plasma Interaction Experiment (TROPIX) is a proposed scientific experiment and flight demonstration of a solar electric propulsion vehicle. Its mission goals are to significantly increase our knowledge of Earth's magnetosphere and its associated plasma environment and to demonstrate an operational solar electric upper stage (SEUS) for small launch vehicles. The scientific investigations and flight demonstration technology experiments are uniquely interrelated because of the spacecraft's interaction with the surrounding environment. The data obtained will complement previous studies of the Earth's magnetosphere and space plasma environment by supplying the knowledge necessary to attain the strategic objectives of the NASA Office of Space Science. This first operational use of a primary ion propulsion vehicle, designed to withstand the harsh environments from low Earth orbit to geosynchronous Earth orbit, may lead to the development of a new class of electric propulsion upper stages or space-based transfer vehicles and may improve future spacecraft design and safety.

  11. System design of the Pioneer Venus spacecraft. Volume 10: Propulsion/orbit insertion subsystem studies

    NASA Technical Reports Server (NTRS)

    Rosenstein, B. J.

    1973-01-01

    The Pioneer Venus orbiter and multiprobe missions require spacecraft maneuvers for successful accomplishment. This report presents the results of studies performed to define the propulsion subsystems required to perform those maneuvers. Primary goals were to define low mass subsystems capable of performing the required missions with a high degree of reliability for low cost. A review was performed of all applicable propellants and thruster types, as well as propellant management techniques. Based on this review, a liquid monopropellant hydrazine propulsion subsystem was selected for all multiprobe mission maneuvers, and for all orbiter mission maneuvers except orbit insertion. A pressure blowdown operating mode was selected using helium as the pressurizing gas. The forces associated with spacecraft rotations were used to control the liquid-gas interface and resulting propellant orientation within the tank.

  12. Spin–orbit DFT with Analytic Gradients and Applications to Heavy Element Compounds

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhang, Zhiyong

    We have implemented the unrestricted DFT approach with one-electron spin–orbit operators in the massively parallel NWChem program. Also implemented is the analytic gradient in the DFT approach with spin–orbit interactions. The current capabilities include single-point calculations and geometry optimization. Vibrational frequencies can be calculated numerically from the analytically calculated gradients. The implementation is based on the spin–orbit interaction operator derived from the effective core potential approach. The exchange functionals used in the implementation are functionals derived for non-spin–orbit calculations, including GGA as well as hybrid functionals. Spin–orbit Hartree–Fock calculations can also be carried out. We have applied the spin–orbit DFTmore » methods to the Uranyl aqua complexes. We have optimized the structures and calculated the vibrational frequencies of both (UO2 2+)aq and (UO2 +)aq with and without spin–orbit effects. The effects of the spin–orbit interaction on the structures and frequencies of these two complexes are discussed. We also carried out calculations for Th2, and several low-lying electronic states are calculated. Our results indicate that, for open-shell systems, there are significant effects due to the spin–orbit effects and the electronic configurations with and without spin–orbit interactions could change due to the occupation of orbitals of larger spin–orbit interactions.« less

  13. Payload/orbiter contamination control requirement study, volume 2, exhibit A

    NASA Technical Reports Server (NTRS)

    Bareiss, L. E.; Hooper, V. W.; Rantanen, R. O.; Ress, E. B.

    1974-01-01

    The computer printout data generated during the Payload/Orbiter Contamination Control Requirement Study are presented. The computer listings of the input surface data matrices, the viewfactor data matrices, and the geometric relationship data matrices for the three orbiter/spacelab configurations analyzed in this study are given. These configurations have been broken up into the geometrical surfaces and nodes necessary to define the principal critical surfaces whether they are contaminant sources, experimental surfaces, or operational surfaces. A numbering scheme was established based upon nodal numbers that relates the various spacelab surfaces to a specific surface material or function. This numbering system was developed for the spacelab configurations such that future extension to a surface mapping capability could be developed as required.

  14. Analogue spin-orbit torque device for artificial-neural-network-based associative memory operation

    NASA Astrophysics Data System (ADS)

    Borders, William A.; Akima, Hisanao; Fukami, Shunsuke; Moriya, Satoshi; Kurihara, Shouta; Horio, Yoshihiko; Sato, Shigeo; Ohno, Hideo

    2017-01-01

    We demonstrate associative memory operations reminiscent of the brain using nonvolatile spintronics devices. Antiferromagnet-ferromagnet bilayer-based Hall devices, which show analogue-like spin-orbit torque switching under zero magnetic fields and behave as artificial synapses, are used. An artificial neural network is used to associate memorized patterns from their noisy versions. We develop a network consisting of a field-programmable gate array and 36 spin-orbit torque devices. An effect of learning on associative memory operations is successfully confirmed for several 3 × 3-block patterns. A discussion on the present approach for realizing spintronics-based artificial intelligence is given.

  15. Structural assembly demonstration experiment, phase 1

    NASA Astrophysics Data System (ADS)

    Akin, David L.; Bowden, Mary L.; Miller, Rene H.

    1983-03-01

    The goal of this phase of the structural assembly and demonstration experiment (SADE) program was to begin to define a shuttle flight experiment that would yield data to compare on-orbit assembly operations of large space structures with neutral buoyancy simulations. In addition, the experiment would be an early demonstration of structural hardware and human capabilities in extravehicular activity (EVA). The objectives of the MIT study, as listed in the statement of work, were: to provide support in establishing a baseline neutral buoyancy testing data base, to develop a correlation technique between neutral buoyancy test results and on-orbit operations, and to prepare the SADE experiment plan (MSFC-PLAN-913).

  16. A novel orbiter mission concept for venus with the EnVision proposal

    NASA Astrophysics Data System (ADS)

    de Oliveira, Marta R. R.; Gil, Paulo J. S.; Ghail, Richard

    2018-07-01

    In space exploration, planetary orbiter missions are essential to gain insight into planets as a whole, and to help uncover unanswered scientific questions. In particular, the planets closest to the Earth have been a privileged target of the world's leading space agencies. EnVision is a mission proposal designed for Venus and competing for ESA's next launch opportunity with the objective of studying Earth's closest neighbor. The main goal is to study geological and atmospheric processes, namely surface processes, interior dynamics and atmosphere, to determine the reasons behind Venus and Earth's radically different evolution despite the planets' similarities. To achieve these goals, the operational orbit selection is a fundamental element of the mission design process. The design of an orbit around Venus faces specific challenges, such as the impossibility of choosing Sun-synchronous orbits. In this paper, an innovative genetic algorithm optimization was applied to select the optimal orbit based on the parameters with more influence in the mission planning, in particular the mission duration and the coverage of sites of interest on the Venusian surface. The solution obtained is a near-polar circular orbit with an altitude of 259 km that enables the coverage of all priority targets almost two times faster than with the parameters considered before this study.

  17. Enhancing orbital servicing operations: Providing positive and effective management of spare and installed hardware - A case study of the Hubble Space Telescope

    NASA Technical Reports Server (NTRS)

    Randolph, Joseph L.; Shepard, Kenneth E.

    1990-01-01

    The Satellite Resources Management and Tracking System was developed specifically for the Hubble Space Telescope (HST) program, and now, NASA has the ability to immediately access the necessary data for planning successful orbital satellite servicing operations. This system is an online, real-time data base system that contains a plethora of data on each item identified to support the HST throughout its planned 15 year life. Some of the information provided includes the current status, location, quantity, and history of each asset, a separate record for each discrete serial numbered item, procurement lead times on items sensitive to technology obsolescence, and the maintenance and repair history of each asset. Finally, details are provided on organizational, operational and logistics requirements.

  18. Technical draft study report for TOPEX satellite options study, volume 1

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The use of two spacecraft for adaptation to the TOPEX mission, namely the P80-1 and the GPS phase 2 are considered. The mission involved three mission options, each option varying in payload definition, payload weight, orbital altitude and payload power requirements. The P80-1 spacecraft is an Air Force Space Test Program satellite which carries a number of payloads to an orbital altitude of 400 n.mi. at a minimum inclination of 72.5 deg, and which has an orbital life capability of three years. The GPS phase 2 spacecraft is the operational satellite for the Global Positioning NAVSTAR navigation constellation provided for all service (and commercial) use.

  19. KSC-98pc191

    NASA Image and Video Library

    1998-01-21

    Astronaut Stephen Oswald, at right, explains Shuttle operations to Ohio Senator John Glenn on the orbiter Columbia's middeck at the Orbiter Processing Facility 3 at Kennedy Space Center. Senator Glenn arrived at KSC on Jan. 20 to tour KSC operational areas and to view the launch of STS-89 later this week. Glenn, who made history in 1962 as the first American to orbit the Earth, completing three orbits in a five-hour flight aboard Friendship 7, will fly his second space mission aboard Space Shuttle Discovery this October. Glenn is retiring from the Senate at the end of this year and will be a payload specialist aboard STS-95

  20. Sub-orbital commercial human spaceflight and informed consent.

    PubMed

    Carminati, Maria-Vittoria; Griffith, Doug; Campbell, Mark R

    2011-02-01

    Commercial spaceflight is expected to rapidly develop in the near future. This will begin with sub-orbital missions and then progress to orbital flights. Technical informed consent of spaceflight participants is required by the commercial spaceflight operator for regulatory purposes. Additionally, though not required by regulation, the aerospace medicine professional involved in the medical screening of both spaceflight participants and crewmembers will be asked to assist operators in obtaining medical informed consent for liability purposes. The various federal and state regulations regarding informed consent for sub-orbital commercial spaceflight are evolving and are unfamiliar to most aerospace medical professionals and are reviewed and discussed.

  1. Planning Orbiter Flights

    NASA Technical Reports Server (NTRS)

    Harris, H. M.; Bergam, M. J.; Kim, S. L.; Smith, E. A.

    1987-01-01

    Shuttle Mission Design and Operations Software (SMDOS) assists in design and operation of missions involving spacecraft in low orbits around Earth by providing orbital and graphics information. SMDOS performs following five functions: display two world and two polar maps or any user-defined window 5 degrees high in latitude by 5 degrees wide in longitude in one of eight standard projections; designate Earth sites by points or polygon shapes; plot spacecraft ground track with 1-min demarcation lines; display, by means of different colors, availability of Tracking and Data Relay Satellite to Shuttle; and calculate available times and orbits to view particular site, and corresponding look angles. SMDOS written in Laboratory Micro-systems FORTH (1979 standard)

  2. Preliminary Design Considerations for Access and Operations in Earth-Moon L1/L2 Orbits

    NASA Technical Reports Server (NTRS)

    Folta, David C.; Pavlak, Thomas A.; Haapala, Amanda F.; Howell, Kathleen C.

    2013-01-01

    Within the context of manned spaceflight activities, Earth-Moon libration point orbits could support lunar surface operations and serve as staging areas for future missions to near-Earth asteroids and Mars. This investigation examines preliminary design considerations including Earth-Moon L1/L2 libration point orbit selection, transfers, and stationkeeping costs associated with maintaining a spacecraft in the vicinity of L1 or L2 for a specified duration. Existing tools in multi-body trajectory design, dynamical systems theory, and orbit maintenance are leveraged in this analysis to explore end-to-end concepts for manned missions to Earth-Moon libration points.

  3. Addition and subtraction operation of optical orbital angular momentum with dielectric metasurfaces

    NASA Astrophysics Data System (ADS)

    Yi, Xunong; Li, Ying; Ling, Xiaohui; Liu, Yachao; Ke, Yougang; Fan, Dianyuan

    2015-12-01

    In this work, we propose a simple approach to realize addition and subtraction operation of optical orbital angular momentum (OAM) based on dielectric metasurfaces. The spin-orbit interaction of light in spatially inhomogeneous and anisotropic metasurfaces results in the spin-to-orbital angular momentum conversion. The subtraction system of OAM consists of two cascaded metasurfaces, while the addition system of OAM is constituted by inserting a half waveplate (HWP) between the two metasurfaces. Our experimental results are in good agreement with the theoretical calculation. These results could be useful for OAM-carrying beams applied in optical communication, information processing, etc.

  4. Pre-Flight Tests with Astronauts, Flight and Ground Hardware, to Assure On-Orbit Success

    NASA Technical Reports Server (NTRS)

    Haddad Michael E.

    2010-01-01

    On-Orbit Constraints Test (OOCT's) refers to mating flight hardware together on the ground before they will be mated on-orbit or on the Lunar surface. The concept seems simple but it can be difficult to perform operations like this on the ground when the flight hardware is being designed to be mated on-orbit in a zero-g/vacuum environment of space or low-g/vacuum environment on the Lunar/Mars Surface. Also some of the items are manufactured years apart so how are mating tasks performed on these components if one piece is on-orbit/on Lunar/Mars surface before its mating piece is planned to be built. Both the Internal Vehicular Activity (IVA) and Extra-Vehicular Activity (EVA) OOCT's performed at Kennedy Space Center will be presented in this paper. Details include how OOCT's should mimic on-orbit/Lunar/Mars surface operational scenarios, a series of photographs will be shown that were taken during OOCT's performed on International Space Station (ISS) flight elements, lessons learned as a result of the OOCT's will be presented and the paper will conclude with possible applications to Moon and Mars Surface operations planned for the Constellation Program.

  5. Proving the Space Transportation System: the Orbital Flight Test Program

    NASA Technical Reports Server (NTRS)

    Reichhardt, T.

    1982-01-01

    The main propulsion system, solid rocket boosters, external tank, orbital maneuvering system, spacecraft orbital operations (thermal tests, attitude control and remote manipulator), and return to Earth are outlined for the first four STS missions.

  6. Communication: Photoionization of degenerate orbitals for randomly oriented molecules: The effect of time-reversal symmetry on recoil-ion momentum angular distributions

    NASA Astrophysics Data System (ADS)

    Suzuki, Yoshi-Ichi

    2018-04-01

    The photoelectron asymmetry parameter β, which characterizes the direction of electrons ejected from a randomly oriented molecular ensemble by linearly polarized light, is investigated for degenerate orbitals. We show that β is totally symmetric under the symmetry operation of the point group of a molecule, and it has mixed properties under time reversal. Therefore, all degenerate molecular orbitals, except for the case of degeneracy due to time reversal, have the same β (Wigner-Eckart theorem). The exceptions are e-type complex orbitals of the Cn, Sn, Cnh, T, and Th point groups, and calculations on boric acid (C3h symmetry) are performed as an example. However, including those point groups, all degenerate orbitals have the same β if those orbitals are real. We discuss the implications of this operator formalism for molecular alignment and photoelectron circular dichroism.

  7. Short-Arc Orbit Determination Results and Space Debris Test Observation of the OWL-Net

    NASA Astrophysics Data System (ADS)

    Choi, J.; Jo, J.; Yim, H.

    Korea Astronomy and Space Science Institute had developed the Optical Wide-field patroL-Network (OWL-Net) for maintaining the domestic Low Earth Orbit satellites’ ephemeris and monitoring Geostationary Earth Orbit region. It also can be used to observe space debris. The orbit determination process was planned with batch least square orbit estimator for every week. The optical tracking window is very narrow, several times per week. Sequentialbatch type estimation strategy was attempted for more reliable orbit prediction. We compared the test operation results with Two Line Elements and CPF files to validate the system. This results can be used to estimate the performance of the OWL-Net operations. And also we had observation of the Astro-H debris. We got the dozens of photometric data of the Astro-H debris main part for a few seconds with the chopper system.

  8. Orbit Determination and Navigation Software Testing for the Mars Reconnaissance Orbiter

    NASA Technical Reports Server (NTRS)

    Pini, Alex

    2011-01-01

    During the extended science phase of the Mars Reconnaissance Orbiter's lifecycle, the operational duties pertaining to navigation primarily involve orbit determination. The orbit determination process utilizes radiometric tracking data and is used for the prediction and reconstruction of MRO's trajectories. Predictions are done twice per week for ephemeris updates on-board the spacecraft and for planning purposes. Orbit Trim Maneuvers (OTM-s) are also designed using the predicted trajectory. Reconstructions, which incorporate a batch estimator, provide precise information about the spacecraft state to be synchronized with scientific measurements. These tasks were conducted regularly to validate the results obtained by the MRO Navigation Team. Additionally, the team is in the process of converting to newer versions of the navigation software and operating system. The capability to model multiple densities in the Martian atmosphere is also being implemented. However, testing outputs among these different configurations was necessary to ensure compliance to a satisfactory degree.

  9. Small Aerostationary Telecommunications Orbiter Concept for Mars in the 2020s

    NASA Technical Reports Server (NTRS)

    Lock, Robert E.; Edwards, Charles D., Jr.; Nicholas, Austin; Woolley, Ryan; Bell, David J.

    2016-01-01

    Current Mars science orbiters carry UHF proximity payloads to provide limited access and data services to landers and rovers on Mars surface. In the era of human spaceflight to Mars, very high rate and reliable relay services will be needed to serve a large number of supporting vehicles, habitats, and orbiters, as well as astronaut EVAs. These will likely be provided by a robust network of orbiting assets in very high orbits, such as areostationary orbits. In the decade leading to that era, telecommunications orbits can be operated at areostationary orbit that can support a significant population of robotic precursor missions and build the network capabilities needed for the human spaceflight era. Telecommunications orbiters of modest size and cost, delivered by Solar Electric Propulsion to areostationary orbit, can provide continuous access at very high data rates to users on the surface and in Mars orbit.In the era of human spaceflight to Mars very high rate andreliable relay services will be needed to serve a largenumber of supporting vehicles, habitats, and orbiters, aswell as astronaut EVAs. These could be provided by arobust network of orbiting assets in very high orbits. In thedecade leading to that era, telecommunications orbiterscould be operated at areostationary orbit that could support asignificant population of robotic precursor missions andbuild the network capabilities needed for the humanspaceflight era. These orbiters could demonstrate thecapabilities and services needed for the future but withoutthe high bandwidth and high reliability requirements neededfor human spaceflight.Telecommunications orbiters of modest size and cost,delivered by Solar Electric Propulsion to areostationaryorbit, could provide continuous access at very high datarates to users on the surface and in Mars orbit. Twoexamples highlighting the wide variety of orbiter deliveryand configuration options were shown that could providehigh-performance service to users.

  10. Advanced Communications Technology Satellite (ACTS) Used for Inclined Orbit Operations

    NASA Technical Reports Server (NTRS)

    Bauer, Robert A.

    2000-01-01

    The Advanced Communications Technology Satellite (ACTS) is operated by the NASA Glenn Research Center at Lewis Field 24 hours a day, 7 days a week. ACTS, which was launched in September 1993, is in its 7th year of operations, far exceeding the system s planned 2 years of operations and 4 years of designed mission life. After 5 successful years of operating as a geostationary satellite, the spacecraft s North-South stationkeeping was discontinued in August 1998. The system is now operating in an inclined orbit that increases at a rate of 0.8 /yr. With only scarce fuel remaining, operating in this mode extends the usage of the still totally functional payload. Although tracking systems are now needed on the experimenter Earth stations, experiment operations have continued with very little disruption. This is the only known geosynchronous Ka-band (30/20 GHz) spot-beam satellite operating in an inclined orbit. The project began its transition from geostationary operations to inclined operations in August 1998. This did not interrupt operations and was transparent to the experimenters on the system. For the space segment, new daily procedures were implemented to maintain the pointing of the system s narrow 0.3 spot beams while the spacecraft drifts in the North-South direction. For the ground segment, modifications were designed, developed, and fielded for the three classes of experimenter Earth stations. With the next generation of commercial satellite systems still being developed, ACTS remains the only operational testbed for Ka-band geosynchronous satellite communications over the Western hemisphere. Since inclined orbit operations began, the ACTS experiments program has supported 43 investigations by industry, Government, and academic organizations, as well as four demonstrations. The project s goals for inclined-orbit operations now reflect a narrower focus in the types of experiments that will be done. In these days of "faster, better, cheaper," NASA is seeking to gain greater relevance to the agency s mission from these experiments. One area that is of much interest both to NASA and the commercial world is the investigation of protocol issues related to the interoperability of satellites with terrestrial networks, such as Transmission Control Protocol/Internet Protocol (TCP/IP) and Asynchronous Transfer Mode (ATM) over wideband satellites. Other experiment areas of interest are supporting the U.S. Government and NASA as they begin using commercial space assets to meet their communications needs, evaluating issues related to operating a spot-beam satellite in inclined orbit, and evaluating new Ka-band hardware that requires a satellite link. ACTS is now in its last year of operations. Operations are planned through June 2000, when after 81 months of operations, this very successful spacecraft will be superorbited and made inert.

  11. Atmospheric, Magnetospheric and Plasmas in Space (AMPS) spacelab payload definition study. Volume 3: Interface control documents. Part 1: AMPS payload to shuttle ICD

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Physical, functional, and operational interfaces between the space shuttle orbiter and the AMPS payload are described for the ground handling and test phases, prelaunch, launch and ascent, operational, stowage, and reentry and landing activities.

  12. TDRS orbit determination by radio interferometry

    NASA Technical Reports Server (NTRS)

    Pavloff, Michael S.

    1994-01-01

    In support of a NASA study on the application of radio interferometry to satellite orbit determination, MITRE developed a simulation tool for assessing interferometry tracking accuracy. The Orbit Determination Accuracy Estimator (ODAE) models the general batch maximum likelihood orbit determination algorithms of the Goddard Trajectory Determination System (GTDS) with the group and phase delay measurements from radio interferometry. ODAE models the statistical properties of tracking error sources, including inherent observable imprecision, atmospheric delays, clock offsets, station location uncertainty, and measurement biases, and through Monte Carlo simulation, ODAE calculates the statistical properties of errors in the predicted satellites state vector. This paper presents results from ODAE application to orbit determination of the Tracking and Data Relay Satellite (TDRS) by radio interferometry. Conclusions about optimal ground station locations for interferometric tracking of TDRS are presented, along with a discussion of operational advantages of radio interferometry.

  13. Thermal performance of the CrIS passive cryocooler

    NASA Astrophysics Data System (ADS)

    Ghaffarian, B.; Kohrman, R.; Magner, A.

    2006-02-01

    The configuration, performance, and test validation of a passive radiant cooler for the National Polar-orbiting Operational Environmental Satellite System (NPOESS) Crosstrack Infrared Sounder (CrIS) Instrument are presented. The cooler is required to provide cryogenic operation of IR focal planes. The 11 kg device, based on prior ITT Industries Space Systems Division coolers, requires virtually no power. It uses multiple thermally isolated cooling stages, each with an independent cryoradiator, operating at successively colder temperatures. The coldest stage, with a controlled set point at 81 K, cools a longwave IR (LWIR) focal plane. An intermediate stage, with a 98 K control point, cools detectors operating in MWIR and SWIR spectral regions. The warmest stage includes a fixed, integral earth shield that limits the thermal load from the earth in the NPOESS Operational Low-earth Orbiting (LEO) orbit. A study of the thermal balance and loads analysis used to evaluate the predicted cooler performance is discussed. High performance margins have been retained throughout the cooler development, fabrication and test phases of the program. The achievable in-orbit temperatures for this cooler are anticipated to be 73 K for the LWIR cooling stage and 91 K for the midwave IR (MWIR)/shortwave IR (SWIR) stage. Test results from two iterations of thermal vacuum verification testing are presented. Lessons learned from the first test, which failed to produce the predicted performance are included. The thermal model of the cooler and test configuration was used to identify deficiencies in the test targets resulting in unexpected heat loads. Corrective action was implemented to remove the heat leaks and a second test verified both the cooler performance and the correlation of the detailed thermal model.

  14. Space platform expendables resupply concept definition study. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1984-01-01

    NASA has recognized that the capability for remote resupply of space platform expendable fluids will help transition space utilization into a new era of operational efficiency and cost/effectiveness. The emerging Orbital Maneuvering System (OMV) in conjunction with an expendables resupply module will introduce the capability for fluid resupply enabling satellite lifetime extension at locations beyond the range of the Orbiter. This report summarizes a Phase A study of a remote resupply module for the OMV. Volume 1 is the executive summary.

  15. Special section introduction on MicroMars to MegaMars

    USGS Publications Warehouse

    Bridges, Nathan T.; Dundas, Colin M.; Edgar, Lauren

    2016-01-01

    The study of Earth's surface and atmosphere evolved from local investigations to the incorporation of remote sensing on a global scale. The study of Mars has followed the opposite progression, beginning with telescopic observations, followed by flyby and orbital missions, landers, and finally rover missions in the last ∼20 years. This varied fleet of spacecraft (seven of which are currently operating as of this writing) provides a rich variety of datasets at spatial scales ranging from microscopic images to synoptic orbital remote sensing.

  16. NASA philosophy concerning space stations as operations centers for construction and maintenance of large orbiting energy systems

    NASA Technical Reports Server (NTRS)

    Freitag, R. F.

    1976-01-01

    Future United States plans for manned space-flight activities are summarized, emphasizing the long-term goals of achieving permanent occupancy and limited self-sufficiency in space. NASA-sponsored studies of earth-orbiting Space Station concepts are reviewed along with lessons learned from the Skylab missions. Descriptions are presented of the Space Transportation System, the Space Construction Base, and the concept of space industrialization (the processing and manufacturing of goods in space). Future plans for communications satellites, solar-power satellites, terrestrial observations from space stations, and manned orbital-transfer vehicles are discussed.

  17. Magnetic anisotropy in nickel complexes as determined by combined magnetic susceptibility/magnetization/theoretical studies

    NASA Astrophysics Data System (ADS)

    Mašlejová, Anna; Boča, Roman; Dlháň, L.'ubor; Herchel, Radovan

    2004-05-01

    The zero-field splitting in nickel(II) complexes was modeled by considering all relevant operators (electron repulsion, crystal-field, spin-orbit coupling, orbital-Zeeman, and spin-Zeeman) in the complete basis set spanned by d n-atomic terms. D-values between weak and strong crystal field limits were evaluated from the crystal-field multiplets as well as using the spin Hamiltonian formalism. Importance of the anisotropic orbital reduction factors is discussed and exemplified by D/hc=-22 cm-1 as subtracted from magnetic data for [Ni(imidazole) 4(acetate) 2] complex.

  18. Earth-orbit mission considerations and Space Tug requirements.

    NASA Technical Reports Server (NTRS)

    Huber, W. G.

    1973-01-01

    The reusable Space Tug is a major system planned to augment the Space Shuttle's capability to deliver, retrieve, and support automated payloads. The Space Tug will be designed to perform round-trip missions from low earth orbit to geosynchronous orbit. Space Tug goals and requirements are discussed together with the characteristics of the full capability Tug. The Tug is to be operated in an unmanned 'teleoperator' fashion. Details of potential teleoperator applications are considered, giving attention to related systems studies, candidate Tug mission applications, Tug 'end-effector' alternatives, technical issues associated with Tug payload retrieval, and Tug/payload accommodations.

  19. Electrochemical Energy Storage for an Orbiting Space Station

    NASA Technical Reports Server (NTRS)

    Martin, R. E.

    1981-01-01

    The system weight of a multi hundred kilowatt fuel cell electrolysis cell energy storage system based upon alkaline electrochemical cell technology for use in a future orbiting space station in low Earth orbit (LEO) was studied. Preliminary system conceptual design, fuel cell module performance characteristics, subsystem and system weights, and overall system efficiency are identified. The impact of fuel cell module operating temperature and efficiency upon energy storage system weight is investigated. The weight of an advanced technology system featuring high strength filament wound reactant tanks and a fuel cell module employing lightweight graphite electrolyte reservoir plates is defined.

  20. Experimental Study on the Precise Orbit Determination of the BeiDou Navigation Satellite System

    PubMed Central

    He, Lina; Ge, Maorong; Wang, Jiexian; Wickert, Jens; Schuh, Harald

    2013-01-01

    The regional service of the Chinese BeiDou satellite navigation system is now in operation with a constellation including five Geostationary Earth Orbit satellites (GEO), five Inclined Geosynchronous Orbit (IGSO) satellites and four Medium Earth Orbit (MEO) satellites. Besides the standard positioning service with positioning accuracy of about 10 m, both precise relative positioning and precise point positioning are already demonstrated. As is well known, precise orbit and clock determination is essential in enhancing precise positioning services. To improve the satellite orbits of the BeiDou regional system, we concentrate on the impact of the tracking geometry and the involvement of MEOs, and on the effect of integer ambiguity resolution as well. About seven weeks of data collected at the BeiDou Experimental Test Service (BETS) network is employed in this experimental study. Several tracking scenarios are defined, various processing schemata are designed and carried out; and then, the estimates are compared and analyzed in detail. The results show that GEO orbits, especially the along-track component, can be significantly improved by extending the tracking network in China along longitude direction, whereas IGSOs gain more improvement if the tracking network extends in latitude. The involvement of MEOs and ambiguity-fixing also make the orbits better. PMID:23529116

  1. Comparison of ERBS orbit determination accuracy using batch least-squares and sequential methods

    NASA Technical Reports Server (NTRS)

    Oza, D. H.; Jones, T. L.; Fabien, S. M.; Mistretta, G. D.; Hart, R. C.; Doll, C. E.

    1991-01-01

    The Flight Dynamics Div. (FDD) at NASA-Goddard commissioned a study to develop the Real Time Orbit Determination/Enhanced (RTOD/E) system as a prototype system for sequential orbit determination of spacecraft on a DOS based personal computer (PC). An overview is presented of RTOD/E capabilities and the results are presented of a study to compare the orbit determination accuracy for a Tracking and Data Relay Satellite System (TDRSS) user spacecraft obtained using RTOS/E on a PC with the accuracy of an established batch least squares system, the Goddard Trajectory Determination System (GTDS), operating on a mainframe computer. RTOD/E was used to perform sequential orbit determination for the Earth Radiation Budget Satellite (ERBS), and the Goddard Trajectory Determination System (GTDS) was used to perform the batch least squares orbit determination. The estimated ERBS ephemerides were obtained for the Aug. 16 to 22, 1989, timeframe, during which intensive TDRSS tracking data for ERBS were available. Independent assessments were made to examine the consistencies of results obtained by the batch and sequential methods. Comparisons were made between the forward filtered RTOD/E orbit solutions and definitive GTDS orbit solutions for ERBS; the solution differences were less than 40 meters after the filter had reached steady state.

  2. Experimental study on the precise orbit determination of the BeiDou navigation satellite system.

    PubMed

    He, Lina; Ge, Maorong; Wang, Jiexian; Wickert, Jens; Schuh, Harald

    2013-03-01

    The regional service of the Chinese BeiDou satellite navigation system is now in operation with a constellation including five Geostationary Earth Orbit satellites (GEO), five Inclined Geosynchronous Orbit (IGSO) satellites and four Medium Earth Orbit (MEO) satellites. Besides the standard positioning service with positioning accuracy of about 10 m, both precise relative positioning and precise point positioning are already demonstrated. As is well known, precise orbit and clock determination is essential in enhancing precise positioning services. To improve the satellite orbits of the BeiDou regional system, we concentrate on the impact of the tracking geometry and the involvement of MEOs, and on the effect of integer ambiguity resolution as well. About seven weeks of data collected at the BeiDou Experimental Test Service (BETS) network is employed in this experimental study. Several tracking scenarios are defined, various processing schemata are designed and carried out; and then, the estimates are compared and analyzed in detail. The results show that GEO orbits, especially the along-track component, can be significantly improved by extending the tracking network in China along longitude direction, whereas IGSOs gain more improvement if the tracking network extends in latitude. The involvement of MEOs and ambiguity-fixing also make the orbits better.

  3. Comparison of ERBS orbit determination accuracy using batch least-squares and sequential methods

    NASA Astrophysics Data System (ADS)

    Oza, D. H.; Jones, T. L.; Fabien, S. M.; Mistretta, G. D.; Hart, R. C.; Doll, C. E.

    1991-10-01

    The Flight Dynamics Div. (FDD) at NASA-Goddard commissioned a study to develop the Real Time Orbit Determination/Enhanced (RTOD/E) system as a prototype system for sequential orbit determination of spacecraft on a DOS based personal computer (PC). An overview is presented of RTOD/E capabilities and the results are presented of a study to compare the orbit determination accuracy for a Tracking and Data Relay Satellite System (TDRSS) user spacecraft obtained using RTOS/E on a PC with the accuracy of an established batch least squares system, the Goddard Trajectory Determination System (GTDS), operating on a mainframe computer. RTOD/E was used to perform sequential orbit determination for the Earth Radiation Budget Satellite (ERBS), and the Goddard Trajectory Determination System (GTDS) was used to perform the batch least squares orbit determination. The estimated ERBS ephemerides were obtained for the Aug. 16 to 22, 1989, timeframe, during which intensive TDRSS tracking data for ERBS were available. Independent assessments were made to examine the consistencies of results obtained by the batch and sequential methods. Comparisons were made between the forward filtered RTOD/E orbit solutions and definitive GTDS orbit solutions for ERBS; the solution differences were less than 40 meters after the filter had reached steady state.

  4. MSFC Skylab electrical power systems mission evaluation

    NASA Technical Reports Server (NTRS)

    Woosley, A. P.

    1974-01-01

    The design, development, and operation of the Skylab electrical power system are discussed. The electrical systems for the airlock module of the orbital workshop and the Apollo telescope mount are described. Skylab is considered an integral laboratory, however, both cluster and module hardware distinct sections are included. Significant concept and requirement evolution, testing, and modifications resulting from tests are briefly summarized to aid in understanding the launch configuration description and the procedures and performance discussed for in-orbit operation. Specific problems encountered during Skylab orbital missions are analyzed.

  5. Orbital construction support equipment - Manned remote work station

    NASA Technical Reports Server (NTRS)

    Nassiff, S. H.

    1978-01-01

    The Manned Remote Work Station (MRWS) is a versatile piece of orbital construction support equipment which can support in-space construction in various modes of operation. Proposed near-term Space Shuttle mission support and future large orbiting systems support, along with the various construction modes of MRWS operation, are discussed. Preliminary flight subsystems requirements and configuration design are presented. Integration of the MRWS development test article with the JSC Mockup and Integration Facility, including ground-test objectives and techniques for zero-g simulations, is also presented.

  6. An improved APU for the Space Shuttle Orbiter

    NASA Technical Reports Server (NTRS)

    Mckenna, R.; Hagemann, D.; Loken, G.; Jonakin, J.; Baughman, J.

    1985-01-01

    The Space Shuttle Orbiter Auxiliary Power Unit has operated successfully on all four orbiter vehicles and all missions. The current Auxiliary Power Unit (APU) operational life is limited to 12 missions, and the APU turnaround time between flights is longer than originally anticipated. The objective of the Improved APU program is to increase life to 50 missions, reduce installed vehicle weight by 134 lb., and reduce turnaround time. This paper describes the design changes incorporated into the improved APU and the associated development testing.

  7. ATS-6 engineering performance report. Volume 2: Orbit and attitude controls

    NASA Technical Reports Server (NTRS)

    Wales, R. O. (Editor)

    1981-01-01

    Attitude control is reviewed, encompassing the attitude control subsystem, spacecraft attitude precision pointing and slewing adaptive control experiment, and RF interferometer experiment. The spacecraft propulsion system (SPS) is discussed, including subsystem, SPS design description and validation, orbital operations and performance, in-orbit anomalies and contingency operations, and the cesium bombardment ion engine experiment. Thruster failure due to plugging of the propellant feed passages, a major cause for mission termination, are considered among the critical generic failures on the satellite.

  8. Launch Condition Deviations of Reusable Launch Vehicle Simulations in Exo-Atmospheric Zoom Climbs

    NASA Technical Reports Server (NTRS)

    Urschel, Peter H.; Cox, Timothy H.

    2003-01-01

    The Defense Advanced Research Projects Agency has proposed a two-stage system to deliver a small payload to orbit. The proposal calls for an airplane to perform an exo-atmospheric zoom climb maneuver, from which a second-stage rocket is launched carrying the payload into orbit. The NASA Dryden Flight Research Center has conducted an in-house generic simulation study to determine how accurately a human-piloted airplane can deliver a second-stage rocket to a desired exo-atmospheric launch condition. A high-performance, fighter-type, fixed-base, real-time, pilot-in-the-loop airplane simulation has been modified to perform exo-atmospheric zoom climb maneuvers. Four research pilots tracked a reference trajectory in the presence of winds, initial offsets, and degraded engine thrust to a second-stage launch condition. These launch conditions have been compared to the reference launch condition to characterize the expected deviation. At each launch condition, a speed change was applied to the second-stage rocket to insert the payload onto a transfer orbit to the desired operational orbit. The most sensitive of the test cases was the degraded thrust case, yielding second-stage launch energies that were too low to achieve the radius of the desired operational orbit. The handling qualities of the airplane, as a first-stage vehicle, have also been investigated.

  9. Orbit Software Suite

    NASA Technical Reports Server (NTRS)

    Osgood, Cathy; Williams, Kevin; Gentry, Philip; Brownfield, Dana; Hallstrom, John; Stuit, Tim

    2012-01-01

    Orbit Software Suite is used to support a variety of NASA/DM (Dependable Multiprocessor) mission planning and analysis activities on the IPS (Intrusion Prevention System) platform. The suite of Orbit software tools (Orbit Design and Orbit Dynamics) resides on IPS/Linux workstations, and is used to perform mission design and analysis tasks corresponding to trajectory/ launch window, rendezvous, and proximity operations flight segments. A list of tools in Orbit Software Suite represents tool versions established during/after the Equipment Rehost-3 Project.

  10. Geosynchronous Patrol Orbit for Space Situational Awareness

    NASA Astrophysics Data System (ADS)

    Thompson, B.; Kelecy, T.; Kubancik, T.; Flora, T.; Chylla, M.; Rose, D.

    Applying eccentricity to a geosynchronous orbit produces both longitudinal and radial motion when viewed in Earth-fixed coordinates. An interesting family of orbits emerges, useful for “neighborhood patrol” space situational awareness and other missions. The basic result is a periodic (daily), quasielliptical, closed path around a fixed region of the geosynchronous (geo) orbit belt, keeping a sensor spacecraft in relatively close vicinity to designated geo objects. The motion is similar, in some regards, to the relative motion that may be encountered during spacecraft proximity operations, but on a much larger scale. The patrol orbit does not occupy a fixed slot in the geo belt, and the east-west motion can be combined with north-south motion caused by orbital inclination, leading to even greater versatility. Some practical uses of the geo patrol orbit include space surveillance (including catalog maintenance), and general space situational awareness. The patrol orbit offers improved, diverse observation geometry for angles-only sensors, resulting in faster, more accurate orbit determination compared to simple inclined geo orbits. In this paper, we analyze the requirements for putting a spacecraft in a patrol orbit, the unique station keeping requirements to compensate for perturbations, repositioning the patrol orbit to a different location along the geo belt, maneuvering into, around, and out of the volume for proximity operations with objects within the volume, and safe end-of-life disposal requirements.

  11. Concept for a Lunar Transfer Vehicle for Small Satellite Delivery to the Moon from the International Space Station

    NASA Technical Reports Server (NTRS)

    Elliott, John; Alkalai, Leon

    2010-01-01

    The International Space Station (ISS) has developed as a very capable center for scientific research in Lower Earth Orbit. An additional potential of the ISS that has not thus far been exploited, is the use of this orbiting plat-form for the assembly and launching of vehicles that could be sent to more distant destinations. This paper reports the results of a recent study that looked at an architecture and conceptual flight system design for a lunar transfer vehicle (LTV) that could be delivered to the ISS in segments, assembled, loaded with payload and launched from the ISS with the objective of delivering multiple small and micro satellites to lunar orbit. The design of the LTV was optimized for low cost and high payload capability, as well as ease of assembly. The resulting design would use solar electric propulsion (SEP) to carry a total payload mass of 250 kg from the ISS to a 100 km lunar orbit. A preliminary concept of operations was developed considering currently available delivery options and ISS capabili-ties that should prove flexible enough to accommodate a variety of payloads and missions. This paper will present an overview of the study, including key trades, mission and flight system design, and notional operational concept.

  12. Mission description and in-flight operations of ERBE instruments on ERBS and NOAA 9 spacecraft, November 1984 - January 1986

    NASA Technical Reports Server (NTRS)

    Weaver, William L.; Bush, Kathryn A.; Harris, Chris J.; Howerton, Clayton E.; Tolson, Carol J.

    1991-01-01

    Instruments of the Earth Radiation Budget Experiment (ERBE) are operating on three different Earth orbiting spacecrafts: the Earth Radiation Budget Satellite (ERBS), NOAA-9, and NOAA-10. An overview is presented of the ERBE mission, in-orbit environments, and instrument design and operational features. An overview of science data processing and validation procedures is also presented. In-flight operations are described for the ERBE instruments aboard the ERBS and NOAA-9. Calibration and other operational procedures are described, and operational and instrument housekeeping data are presented and discussed.

  13. In-Flight Operation of the Dawn Ion Propulsion System Through Survey Science Orbit at Ceres

    NASA Technical Reports Server (NTRS)

    Garner, Charles E.; Rayman, Marc D.

    2015-01-01

    The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide a total delta V of 11 km/s for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer between Ceres science orbits. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional delta V of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in September 2012 and concluded with the start of the approach to Ceres phase on December 26, 2015, leading to orbit capture on March 6, 2015. Deterministic thrusting continued during approach to place the spacecraft in its first science orbit, called RC3, which was achieved on April 23, 2015. Following science operations at RC3 ion thrusting was resumed for twenty-five days leading to arrival to the next science orbit, called survey orbit, on June 3, 2015. The IPS will be used for all subsequent orbit transfers and trajectory correction maneuvers until completion of the primary mission in approximately June 2016. To date the IPS has been operated for over 46,774 hours, consumed approximately 393 kg of xenon, and provided a delta V of over 10.8 km/s to the spacecraft. The IPS performance characteristics are very close to the expected performance based on analysis and testing performed pre-launch. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through arrival at the second science orbit at Ceres.

  14. Manned maneuvering unit: User's guide

    NASA Technical Reports Server (NTRS)

    Lenda, J. A.

    1978-01-01

    The space shuttle will provide an opportunity to extend and enhance the crew's inherent capabilities in orbit by allowing them to operate effectively outside of their spacecraft by means of extravehicular activity. For this role, the shuttle crew will have a new, easier to don and operate space suit with integral life support system, and a self-contained propulsive backpack. The backpack, called the manned maneuvering unit, will allow the crew to operate beyond the confines of the Shuttle cargo bay and fly to any part of their own spacecraft or to nearby free-flying payloads or structure. This independent mobility will be used to support a wide variety of activities including free-space transfer of cargo and personnel, inspection and monitoring of orbital operations, and construction and assembly of large structures in orbit.

  15. Orbital transfer vehicle concept definition and system analysis study. Volume 4, Appendix A: Space station accommodations. Revision 1

    NASA Technical Reports Server (NTRS)

    Randall, Roger M.

    1987-01-01

    Orbit Transfer Vehicle (OTV) processing at the space station is divided into two major categories: OTV processing and assembly operations, and support operations. These categories are further subdivided into major functional areas to allow development of detailed OTV processing procedures and timelines. These procedures and timelines are used to derive the specific space station accommodations necessary to support OTV activities. The overall objective is to limit impact on OTV processing requirements on space station operations, involvement of crew, and associated crew training and skill requirements. The operational concept maximizes use of automated and robotic systems to perform all required OTV servicing and maintenance tasks. Only potentially critical activities would require direct crew involvement or supervision. EVA operations are considered to be strictly contingency back-up to failure of the automated and robotic systems, with the exception of the initial assembly of Space-Based OTV accommodations at the space station, which will require manned involvement.

  16. The NASA/AFRL Meter Class Autonomous Telescope

    NASA Technical Reports Server (NTRS)

    Cowardin, H.; Lederer, S.; Buckalew, B.; Frith, J.; Hickson, P.; Glesne, T.; Anz-Meador, P.; Barker, E.; Stansbery, G.; Kervin, P.

    2016-01-01

    For the past decade, the NASA Orbital Debris Program Office (ODPO) has relied on using various ground-based telescopes in Chile to acquire statistical survey data as well as photometric and spectroscopic data of orbital debris in geosynchronous Earth orbit (GEO). The statistical survey data have been used to supply the Orbital Debris Engineering Model (ORDEM) v.3.0 with debris detections in GEO to better model the environment at altitudes where radar detections are limited. The data produced for the statistical survey ranged from 30 to 40 nights per year, which only accounted for 10% of the possible observing time. Data collection was restricted by ODPO resources and weather conditions. In order to improve the statistical sampling in GEO, as well as observe and sample other orbits, NASA's ODPO with support from the Air Force Research Laboratory (AFRL), has constructed a new observatory dedicated to orbital debris - the Meter Class Autonomous Telescope (MCAT) on Ascension Island. This location provides MCAT with the unique ability to access targets orbiting at an altitude of less than 1,000 km and low inclinations (< 20 deg). This orbital regime currently has little to no coverage by the U.S. Space Surveillance Network. Unlike previous ODPO optical assets, the ability to operate autonomously will allow rapid response observations of break-up events, an observing mode that was only available via radar tasking prior to MCAT's deployment. The primary goal of MCAT is to statistically characterize GEO via daily tasking files uploaded from ODPO. These tasking files define which operating mode to follow, providing the field center, rates, and/or targets to observe over the entire observing period. The system is also capable of tracking fast-moving targets in low Earth orbit (LEO), middle Earth orbit (MEO), as well as highly eccentric orbits like geostationary transfer orbits. On 25 August 2015, MCAT successfully acquired scientific first light, imaging the Bug Nebula and tracked objects in LEO, MEO, and GEO. NASA is working towards characterizing the system and thoroughly testing the integrated hardware and software control to achieve fully autonomous operations by late 2016. This paper will review the history and current status of the MCAT project, the details of the telescope system, and its five currently manifested operating modes.

  17. Improved solution accuracy for TDRSS-based TOPEX/Poseidon orbit determination

    NASA Technical Reports Server (NTRS)

    Doll, C. E.; Mistretta, G. D.; Hart, R. C.; Oza, D. H.; Bolvin, D. T.; Cox, C. M.; Nemesure, M.; Niklewski, D. J.; Samii, M. V.

    1994-01-01

    Orbit determination results are obtained by the Goddard Space Flight Center (GSFC) Flight Dynamics Division (FDD) using a batch-least-squares estimator available in the Goddard Trajectory Determination System (GTDS) and an extended Kalman filter estimation system to process Tracking and Data Relay Satellite (TDRS) System (TDRSS) measurements. GTDS is the operational orbit determination system used by the FDD in support of the Ocean Topography Experiment (TOPEX)/Poseidon spacecraft navigation and health and safety operations. The extended Kalman filter was implemented in an orbit determination analysis prototype system, closely related to the Real-Time Orbit Determination System/Enhanced (RTOD/E) system. In addition, the Precision Orbit Determination (POD) team within the GSFC Space Geodesy Branch generated an independent set of high-accuracy trajectories to support the TOPEX/Poseidon scientific data. These latter solutions use the geodynamics (GEODYN) orbit determination system with laser ranging and Doppler Orbitography and Radiopositioning integrated by satellite (DORIS) tracking measurements. The TOPEX/Poseidon trajectories were estimated for November 7 through November 11, 1992, the timeframe under study. Independent assessments were made of the consistencies of solutions produced by the batch and sequential methods. The batch-least-squares solutions were assessed based on the solution residuals, while the sequential solutions were assessed based on primarily the estimated covariances. The batch-least-squares and sequential orbit solutions were compared with the definitive POD orbit solutions. The solution differences were generally less than 2 meters for the batch-least-squares and less than 13 meters for the sequential estimation solutions. After the sequential estimation solutions were processed with a smoother algorithm, position differences with POD orbit solutions of less than 7 meters were obtained. The differences among the POD, GTDS, and filter/smoother solutions can be traced to differences in modeling and tracking data types, which are being analyzed in detail.

  18. Combined orbits and clocks from the IGS 2nd reprocessing

    NASA Astrophysics Data System (ADS)

    Griffiths, J.; Ray, J.

    2016-12-01

    In early 2015, the Analysis Centers (ACs) of the International GNSS Service (IGS) completed their second reanalysis of the full history of globally distributed GPS and GLONASS data collected since 1994. The suite of reprocessed AC solutions includes daily product files containing station positions, Earth rotation parameters, satellite orbits and clocks. This second reprocessing—or repro2—provided the IGS contribution to ITRF2014; it follows the successful first reprocessing, which provided the IGS input for ITRF2008. For this poster, we will discuss the newly combined repro2 GPS orbits and clocks. We also revisit our previous analysis of orbit day-boundary discontinuities with several significant changes and improvements: 1) Orbit discontinuities for the contributing ACs were studied in addition to those for the IGS repro2 combined orbits. (2) Apart from homogeneous reprocessing with updated analysis models, the main difference compared to the IGS Final operational products is that NOAA/NGS inputs were not submitted for the IGS reprocessing, yet they contribute heavily in the operational orbits in recent years. (3) Also, during spring 2016, the ESA modified their orbit model so that it is no longer consistent with the one used for reprocessing. A much longer span of orbits was available now, up to 11.2 years for some individual satellites, which allows a far better resolution of spectral features. 4) The procedure to compute orbit discontinuities has been further refined to account for extrapolation edge effects, improved geopotential fields, and to allow for spectral analysis of a longer time series of jumps. The satellite position time series used are complete enough that linear interpolation is necessary for only sparse gaps. So the key results are based on standard FFT power spectra (stacked over the available constellation and lightly smoothed). However, we have also computed Lomb-Scargle periodgrams to provide higher frequency resolution of some spectral peaks and to permit tests of the effect of excluding eclipse periods.

  19. Earth recovery mode analysis for a Martian sample return mission

    NASA Technical Reports Server (NTRS)

    Green, J. P.

    1978-01-01

    The analysis has concerned itself with evaluating alternative methods of recovering a sample module from a trans-earth trajectory originating in the vicinity of Mars. The major modes evaluated are: (1) direct atmospheric entry from trans-earth trajectory; (2) earth orbit insertion by retropropulsion; and (3) atmospheric braking to a capture orbit. In addition, the question of guided vs. unguided entry vehicles was considered, as well as alternative methods of recovery after orbit insertion for modes (2) and (3). A summary of results and conclusions is presented. Analytical results for aerodynamic and propulsive maneuvering vehicles are discussed. System performance requirements and alternatives for inertial systems implementation are also discussed. Orbital recovery operations and further studies required to resolve the recovery mode issue are described.

  20. Current Status of the Beam Position Monitoring System at TLS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kuo, C. H.; Hu, K. H.; Chen, Jenny

    2006-11-20

    The beam position monitoring system is an important part of a synchrotron light source that supports its routine operation and studies of beam physics. The Taiwan light source is equipped with 59 BPMs. Highly precise closed orbits are measured by multiplexing BPMs. Data are acquired using multi-channel 16-bit ADC modules. Orbit data are sampled every millisecond. Fast orbit data are shared in a reflective memory network to support fast orbit feedback. Averaged data were updated to control database at a rate of 10 Hz. A few new generation digital BPMs were tested to evaluate their performance and functionality. This reportmore » summarizes the system structure, the software environment and the preliminary beam test of the BPM system.« less

  1. The Pioneer Venus Orbiter: 11 years of data. A laboratory for atmospheres seminar talk

    NASA Technical Reports Server (NTRS)

    Kasprzak, W. T.

    1990-01-01

    The Pioneer Venus Orbiter has been in operation since orbit insertion on December 4, 1978. For the past 11 years, it has been acquiring data in the salient features of the planet, its atmosphere, ionosphere, and interaction with the solar wind. A few of the results of this mission are summarized and their contribution to our general understanding of the planet Venus is discussed. Although Earth and Venus are often called twin planets, they are only superficially similar. Possessing no obvious evidence of plate tectonics, lacking water and an intrinsic magnetic field, and having a hot, dense carbon dioxide atmosphere with sulfuric acid clouds makes Venus a unique object of study by the Orbiter's instruments.

  2. Utilizing the Lunar Laser Ranging datasets alongside the radioscience data from the Lunar Reconnaissance Orbiter to improve the dynamical model of the Moon

    NASA Astrophysics Data System (ADS)

    Viswanathan, Vishnu; Fienga, Agnes; Laskar, Jacques; Manche, Herve; Torre, Jean-Marie; Courde, Clément; Exertier, Pierre

    2015-08-01

    In this poster we elaborate the use of raw navigation data (range and Doppler observations) from the Lunar Reconnaissance Orbiter (LRO) available on the Planetary Data System (PDS), in order to study the orbit of this probe using the orbit determination software (GINS) developed by the French space agency (CNES). The constraints that are derived from this process on combining with the high precision Lunar Laser Ranging (LLR) datasets which are spread over 40 years, facilitates an improved dynamical modeling of the Moon. In addition, the possible advantages that could be exploited by the LLR experiments when operated with lasers in the IR wavelength are analyzed.

  3. Current Status of the Beam Position Monitoring System at TLS

    NASA Astrophysics Data System (ADS)

    Kuo, C. H.; Hu, K. H.; Chen, Jenny; Lee, Demi; Wang, C. J.; Hsu, S. Y.; Hsu, K. T.

    2006-11-01

    The beam position monitoring system is an important part of a synchrotron light source that supports its routine operation and studies of beam physics. The Taiwan light source is equipped with 59 BPMs. Highly precise closed orbits are measured by multiplexing BPMs. Data are acquired using multi-channel 16-bit ADC modules. Orbit data are sampled every millisecond. Fast orbit data are shared in a reflective memory network to support fast orbit feedback. Averaged data were updated to control database at a rate of 10 Hz. A few new generation digital BPMs were tested to evaluate their performance and functionality. This report summarizes the system structure, the software environment and the preliminary beam test of the BPM system.

  4. JSC Orbital Debris Website Description

    NASA Technical Reports Server (NTRS)

    Johnson, Nicholas L.

    2006-01-01

    Purpose: The website provides information about the NASA Orbital Debris Program Office at JSC, which is the lead NASA center for orbital debris research. It is recognized world-wide for its leadership in addressing orbital debris issues. The NASA Orbital Debris Program Office has taken the international lead in conducting measurements of the environment and in developing the technical consensus for adopting mitigation measures to protect users of the orbital environment. Work at the center continues with developing an improved understanding of the orbital debris environment and measures that can be taken to control its growth. Major Contents: Orbital Debris research is divided into the following five broad efforts. Each area of research contains specific information as follows: 1) Modeling - NASA scientists continue to develop and upgrade orbital debris models to describe and characterize the current and future debris environment. Evolutionary and engineering models are described in detail. Downloadable items include a document in PDF format and executable software. 2) Measurements - Measurements of near-Earth orbital debris are accomplished by conducting ground-based and space-based observations of the orbital debris environment. The data from these sources provide validation of the environment models and identify the presence of new sources. Radar, optical and surface examinations are described. External links to related topics are provided. 3) Protection - Orbital debris protection involves conducting hypervelocity impact measurements to assess the risk presented by orbital debris to operating spacecraft and developing new materials and new designs to provide better protection from the environment with less weight penalty. The data from this work provides the link between the environment defined by the models and the risk presented by that environment to operating spacecraft and provides recommendations on design and operations procedures to reduce the risk as required. These data also help in the analysis and interpretation of impact features on returned spacecraft surfaces. 4) Mitigation - Controlling the growth of the orbital debris population is a high priority for NASA, the United States, and the major space-faring nations of the world to preserve near-Earth space for future generations. Mitigation measures can take the form of curtailing or preventing the creation of new debris, designing satellites to withstand impacts by small debris, and implementing operational procedures ranging from utilizing orbital regimes with less debris, adopting specific spacecraft attitudes, and even maneuvering to avoid collisions with debris. Downloadable items include several documents in PDF format and executable software.and 5) Reentry - Because of the increasing number of objects in space, NASA has adopted guidelines and assessment procedures to reduce the number of non-operational spacecraft and spent rocket upper stages orbiting the Earth. One method of postmission disposal is to allow reentry of these spacecraft, either from orbital decay (uncontrolled entry) or with a controlled entry. Orbital decay may be achieved by firing engines to lower the perigee altitude so that atmospheric drag will eventually cause the spacecraft to enter. However, the surviving debris impact footprint cannot be guaranteed to avoid inhabited landmasses. Controlled entry normally occurs by using a larger amount of propellant with a larger propulsion system to drive the spacecraft to enter the atmosphere at a steeper flight path angle. It will then enter at a more precise latitude, longitude, and footprint in a nearly uninhabited impact region, generally located in the ocean.

  5. Employing lighting techniques during on-orbit operations

    NASA Technical Reports Server (NTRS)

    Wheelwright, Charles D.; Toole, Jennifer R.

    1991-01-01

    As a result of past space missions and evaluations, many procedures have been established and shown to be prudent applications for use in present and future space environment scenarios. However, recent procedures to employ the use of robotics to assist crewmembers in performing tasks which require viewing remote and obstructed locations have led to a need to pursue alternative methods to assist in these operations. One of those techniques which is under development entails incorporating the use of suitable lighting aids/techniques with a closed circuit television (CCTV) camera/monitor system to supervise the robotics operations. The capability to provide adequate lighting during grappling, deploying, docking and berthing operations under all on-orbit illumination conditions is essential to a successful mission. Using automated devices such as the Remote Manipulator System (RMS) to dock and berth a vehicle during payload retrieval, under nighttime, earthshine, solar, or artificial illumination conditions can become a cumbersome task without first incorporating lighting techniques that provide the proper target illumination, orientation, and alignment cues. Studies indicate that the use of visual aids such as the CCTV with a pretested and properly oriented lighting system can decrease the time necessary to accomplish grappling tasks. Evaluations have been and continue to be performed to assess the various on-orbit conditions in order to predict and determine the appropriate lighting techniques and viewing angles necessary to assist crewmembers in payload operations.

  6. Employing lighting techniques during on-orbit operations

    NASA Astrophysics Data System (ADS)

    Wheelwright, Charles D.; Toole, Jennifer R.

    As a result of past space missions and evaluations, many procedures have been established and shown to be prudent applications for use in present and future space environment scenarios. However, recent procedures to employ the use of robotics to assist crewmembers in performing tasks which require viewing remote and obstructed locations have led to a need to pursue alternative methods to assist in these operations. One of those techniques which is under development entails incorporating the use of suitable lighting aids/techniques with a closed circuit television (CCTV) camera/monitor system to supervise the robotics operations. The capability to provide adequate lighting during grappling, deploying, docking and berthing operations under all on-orbit illumination conditions is essential to a successful mission. Using automated devices such as the Remote Manipulator System (RMS) to dock and berth a vehicle during payload retrieval, under nighttime, earthshine, solar, or artificial illumination conditions can become a cumbersome task without first incorporating lighting techniques that provide the proper target illumination, orientation, and alignment cues. Studies indicate that the use of visual aids such as the CCTV with a pretested and properly oriented lighting system can decrease the time necessary to accomplish grappling tasks. Evaluations have been and continue to be performed to assess the various on-orbit conditions in order to predict and determine the appropriate lighting techniques and viewing angles necessary to assist crewmembers in payload operations.

  7. THE SOUTHERN ARGENTINA AGILE METEOR RADAR ORBITAL SYSTEM (SAAMER-OS): AN INITIAL SPORADIC METEOROID ORBITAL SURVEY IN THE SOUTHERN SKY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Janches, D.; Swarnalingam, N.; Close, S.

    2015-08-10

    We present an initial survey in the southern sky of the sporadic meteoroid orbital environment obtained with the Southern Argentina Agile MEteor Radar (SAAMER) Orbital System (OS), in which over three-quarters of a million orbits of dust particles were determined from 2012 January through 2015 April. SAAMER-OS is located at the southernmost tip of Argentina and is currently the only operational radar with orbit determination capability providing continuous observations of the southern hemisphere. Distributions of the observed meteoroid speed, radiant, and heliocentric orbital parameters are presented, as well as those corrected by the observational biases associated with the SAAMER-OS operatingmore » parameters. The results are compared with those reported by three previous surveys performed with the Harvard Radio Meteor Project, the Advanced Meteor Orbit Radar, and the Canadian Meteor Orbit Radar, and they are in agreement with these previous studies. Weighted distributions for meteoroids above the thresholds for meteor trail electron line density, meteoroid mass, and meteoroid kinetic energy are also considered. Finally, the minimum line density and kinetic energy weighting factors are found to be very suitable for meteroid applications. The outcomes of this work show that, given SAAMER’s location, the system is ideal for providing crucial data to continuously study the South Toroidal and South Apex sporadic meteoroid apparent sources.« less

  8. Burn Delay Analysis of the Lunar Orbit Insertion for Korea Pathfinder Lunar Orbiter

    NASA Astrophysics Data System (ADS)

    Bae, Jonghee; Song, Young-Joo; Kim, Young-Rok; Kim, Bangyeop

    2017-12-01

    The first Korea lunar orbiter, Korea Pathfinder Lunar Orbiter (KPLO), has been in development since 2016. After launch, the KPLO will execute several maneuvers to enter into the lunar mission orbit, and will then perform lunar science missions for one year. Among these maneuvers, the lunar orbit insertion (LOI) is the most critical maneuver because the KPLO will experience an extreme velocity change in the presence of the Moon’s gravitational pull. However, the lunar orbiter may have a delayed LOI burn during operation due to hardware limitations and telemetry delays. This delayed burn could occur in different captured lunar orbits; in the worst case, the KPLO could fly away from the Moon. Therefore, in this study, the burn delay for the first LOI maneuver is analyzed to successfully enter the desired lunar orbit. Numerical simulations are performed to evaluate the difference between the desired and delayed lunar orbits due to a burn delay in the LOI maneuver. Based on this analysis, critical factors in the LOI maneuver, the periselene altitude and orbit period, are significantly changed and an additional delta-V in the second LOI maneuver is required as the delay burn interval increases to 10 min from the planned maneuver epoch.

  9. Orbital Debris: the Growing Threat to Space Operations

    NASA Technical Reports Server (NTRS)

    Johnson, Nicholas L.

    2010-01-01

    For nearly 50 years the amount of man-made debris in Earth orbit steadily grew, accounting for about 95% of all cataloged space objects over the past few decades. The Chinese anti-satellite test in January 2007 and the accidental collision of two spacecraft in February 2009 created more than 4000 new cataloged debris, representing an increase of 40% of the official U.S. Satellite Catalog. The frequency of collision avoidance maneuvers for both human space flight and robotic operations is increasing along with the orbital debris population. However, the principal threat to space operations is driven by the smaller and much more numerous uncataloged debris. Although the U.S. and the international aerospace communities have made significant progress in recognizing the hazards of orbital debris and in reducing or eliminating the potential for the creation of new debris, the future environment is expected to worsen without additional corrective measures.

  10. Position, spin, and orbital angular momentum of a relativistic electron

    NASA Astrophysics Data System (ADS)

    Bliokh, Konstantin Y.; Dennis, Mark R.; Nori, Franco

    2017-08-01

    Motivated by recent interest in relativistic electron vortex states, we revisit the spin and orbital angular momentum properties of Dirac electrons. These are uniquely determined by the choice of the position operator for a relativistic electron. We consider two main approaches discussed in the literature: (i) the projection of operators onto the positive-energy subspace, which removes the Zitterbewegung effects and correctly describes spin-orbit interaction effects, and (ii) the use of Newton-Wigner-Foldy-Wouthuysen operators based on the inverse Foldy-Wouthuysen transformation. We argue that the first approach [previously described in application to Dirac vortex beams in K. Y. Bliokh et al., Phys. Rev. Lett. 107, 174802 (2011), 10.1103/PhysRevLett.107.174802] has a more natural physical interpretation, including spin-orbit interactions and a nonsingular zero-mass limit, than the second one [S. M. Barnett, Phys. Rev. Lett. 118, 114802 (2017), 10.1103/PhysRevLett.118.114802].

  11. Orbital Express Advanced Video Guidance Sensor: Ground Testing, Flight Results and Comparisons

    NASA Technical Reports Server (NTRS)

    Pinson, Robin M.; Howard, Richard T.; Heaton, Andrew F.

    2008-01-01

    Orbital Express (OE) was a successful mission demonstrating automated rendezvous and docking. The 2007 mission consisted of two spacecraft, the Autonomous Space Transport Robotic Operations (ASTRO) and the Next Generation Serviceable Satellite (NEXTSat) that were designed to work together and test a variety of service operations in orbit. The Advanced Video Guidance Sensor, AVGS, was included as one of the primary proximity navigation sensors on board the ASTRO. The AVGS was one of four sensors that provided relative position and attitude between the two vehicles. Marshall Space Flight Center was responsible for the AVGS software and testing (especially the extensive ground testing), flight operations support, and analyzing the flight data. This paper briefly describes the historical mission, the data taken on-orbit, the ground testing that occurred, and finally comparisons between flight data and ground test data for two different flight regimes.

  12. DART AVGS Performance

    NASA Technical Reports Server (NTRS)

    Howard, Richard T.; Bryan, Thomas C.

    2007-01-01

    The Advanced Video Guidance Sensor (AVGS) was designed to be the proximity operations sensor for the Demonstration of Autonomous Rendezvous Technologies (DART). The DART mission flew in April of2005 and was a partial success. The AVGS did not get the opportunity to operate in every mode in orbit, but those modes in which it did operate were completely successful. This paper will detail the development, testing, and on-orbit performance of the AVGS.

  13. The deep space network

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The objectives, functions, and organization of the Deep Space Network are summarized along with deep space station, ground communication, and network operations control capabilities. Mission support of ongoing planetary/interplanetary flight projects is discussed with emphasis on Viking orbiter radio frequency compatibility tests, the Pioneer Venus orbiter mission, and Helios-1 mission status and operations. Progress is also reported in tracking and data acquisition research and technology, network engineering, hardware and software implementation, and operations.

  14. A study of flight control requirements for advanced, winged, earth-to-orbit vehicles with far-aft center-of-gravity locations

    NASA Technical Reports Server (NTRS)

    Hepler, A. K.; Zeck, H.; Walker, W. H.; Polack, A.

    1982-01-01

    Control requirements of Controlled Configured Design Approach vehicles with far-aft center of gravity locations are studied. The baseline system investigated is a fully reusable vertical takeoff/horizontal landing single stage-to-orbit vehicle with mission requirements similar to that of the space shuttle vehicle. Evaluations were made to determine dynamic stability boundaries, time responses, trim control, operational center-of-gravity limits, and flight control subsystem design requirements. Study tasks included a baseline vehicle analysis, an aft center of gravity study, a payload size study, and a technology assessment.

  15. Integrated mission management operations

    NASA Technical Reports Server (NTRS)

    1971-01-01

    Operations required to launch a modular space station and to provides sustaining ground operations for support of that orbiting station throughout its 10 year mission are studied. A baseline, incrementally manned program and attendent experiment program options are derived. In addition, features of the program that significantly effect initial development and early operating costs are identified, and their impact on the program is assessed. A preliminary design of the approved modular space station configuration is formulated.

  16. Space Debris and Space Safety - Looking Forward

    NASA Astrophysics Data System (ADS)

    Ailor, W.; Krag, H.

    Man's activities in space are creating a shell of space debris around planet Earth which provides a growing risk of collision with operating satellites and manned systems. Including both the larger tracked objects and the small, untracked debris, more than 98% of the estimated 600,000 objects larger than 1 cm currently in orbit are “space junk”--dead satellites, expended rocket stages, debris from normal operations, fragments from explosions and collisions, and other material. Recognizing the problem, space faring nations have joined together to develop three basic principles for minimizing the growth of the debris population: prevent on-orbit breakups, remove spacecraft and orbital stages that have reached the end of their mission operations from the useful densely populated orbit regions, and limit the objects released during normal operations. This paper provides an overview of what is being done to support these three principles and describes proposals that an active space traffic control service to warn satellite operators of pending collisions with large objects combined with a program to actively remove large objects may reduce the rate of future collisions. The paper notes that cost and cost effectiveness are important considerations that will affect the evolution of such systems.

  17. Copernicus POD Service: Orbit Determination of the Sentinel Satellites

    NASA Astrophysics Data System (ADS)

    Peter, Heike; Fernández, Jaime; Ayuga, Francisco; Féménias, Pierre

    2016-04-01

    The Copernicus POD (Precise Orbit Determination) Service is part of the Copernicus Processing Data Ground Segment (PDGS) of the Sentinel-1, -2 and -3 missions. A GMV-led consortium is operating the Copernicus POD Service being in charge of generating precise orbital products and auxiliary data files for their use as part of the processing chains of the respective Sentinel PDGS. Sentinel-1A was launched in April 2014 while Sentinel-2A was on June 2015 and both are routinely operated since then. Sentinel-3A is expected to be launched in February 2016 and Sentinel-1B is planned for spring 2016. Thus the CPOD Service will be operating three to four satellites simultaneously in spring 2016. The satellites of the Sentinel-1, -2, and -3 missions are all equipped with dual frequency high precision GPS receivers delivering the main observables for POD. Sentinel-3 satellites will additionally be equipped with a laser retro reflector for Satellite Laser Ranging and a receiver for DORIS tracking. All three types of observables (GPS, SLR and DORIS) will be used routinely for POD. The POD core of the CPOD Service is NAPEOS (Navigation Package for Earth Orbiting Satellites) the leading ESA/ESOC software for precise orbit determination. The careful selection of models and inputs is important to achieve the different but very demanding requirements in terms of orbital accuracy and timeliness for the Sentinel -1, -2 & -3 missions. The three missions require orbital products with various latencies from 30 minutes up to 20-30 days. The accuracy requirements are also different and partly very challenging, targeting 5 cm in 3D for Sentinel-1 and 2-3 cm in radial direction for Sentinel-3. Although the characteristics and the requirements are different for the three missions the same core POD setup is used to the largest extent possible. This strategy facilitates maintenance of the complex system of the CPOD Service. Updates in the dynamical modelling of the satellite orbits, e.g. improvements of the box-wing models, have been done to deliver best possible orbit solutions for the satellite. Quality control of the CPOD orbits is done by validating them with independent orbit solutions provided by the Copernicus POD Quality Working Group. The cross-comparison of orbit solutions from different institutions is essential to monitor and to improve the orbit accuracy because for Sentinel-1 and -2 this is the only possibility to externally assess the quality of the orbits. Sentinel-3 orbits may additionally be validated by using SLR and DORIS observations. This paper presents the Copernicus POD Service in terms of operations and orbital accuracy achieved by the different orbit products of the different missions. For Sentinel-1 and Sentinel-2, this paper presents the impact of the box-wing models. For Sentinel-3, the orbital accuracy will be assessed using the very first data after launch.

  18. Orbiter CIU/IUS communications hardware evaluation

    NASA Technical Reports Server (NTRS)

    Huth, G. K.

    1979-01-01

    The DOD and NASA inertial upper stage communication system design, hardware specifications and interfaces were analyzed to determine their compatibility with the Orbiter payload communications equipment (Payload Interrogator, Payload Signal Processors, Communications Interface Unit, and the Orbiter operational communications equipment (the S-Band and Ku-band systems). Topics covered include (1) IUS/shuttle Orbiter communications interface definition; (2) Orbiter avionics equipment serving the IUS; (3) IUS communication equipment; (4) IUS/shuttle Orbiter RF links; (5) STDN/TDRS S-band related activities; and (6) communication interface unit/Orbiter interface issues. A test requirement plan overview is included.

  19. EIVAN - AN INTERACTIVE ORBITAL TRAJECTORY PLANNING TOOL

    NASA Technical Reports Server (NTRS)

    Brody, A. R.

    1994-01-01

    The Interactive Orbital Trajectory planning Tool, EIVAN, is a forward looking interactive orbit trajectory plotting tool for use with Proximity Operations (operations occurring within a one kilometer sphere of the space station) and other maneuvers. The result of vehicle burns on-orbit is very difficult to anticipate because of non-linearities in the equations of motion governing orbiting bodies. EIVAN was developed to plot resulting trajectories, to provide a better comprehension of orbital mechanics effects, and to help the user develop heuristics for onorbit mission planning. EIVAN comprises a worksheet and a chart from Microsoft Excel on a Macintosh computer. The orbital path for a user-specified time interval is plotted given operator burn inputs. Fuel use is also calculated. After the thrust parameters (magnitude, direction, and time) are input, EIVAN plots the resulting trajectory. Up to five burns may be inserted at any time in the mission. Twenty data points are plotted for each burn and the time interval can be varied to accommodate any desired time frame or degree of resolution. Since the number of data points for each burn is constant, the mission duration can be increased or decreased by increasing or decreasing the time interval. The EIVAN program runs with Microsoft's Excel for execution on a Macintosh running Macintosh OS. A working knowledge of Excel is helpful, but not imperative, for interacting with EIVAN. The program was developed in 1989.

  20. Summary Report of Mission Acceleration Measurement for STS-87: Launched November 19, 1997

    NASA Technical Reports Server (NTRS)

    Rogers, Melissa J. B.; Hrovat, Kenneth; McPherson, Kevin; DeLombard, Richard; Reckart, Timothy

    1999-01-01

    Two accelerometer systems, the Orbital Acceleration Research Experiment and the Space Acceleration Measurement System, were used to measure and record the microgravity environment of the Orbiter Columbia during the STS-87 mission in November-December 1997. Data from two separate Space Acceleration Measurement System units were telemetered to the ground during the mission and data plots were displayed for investigators of the Fourth United States Microgravity Payload experiments in near real-time using the World Wide Web. Plots generated using Orbital Acceleration Research Experiment data (telemetered to the ground using a tape delay) were provided to the investigators using the World Wide Web approximately twelve hours after data recording. Disturbances in the microgravity environment as recorded by these instruments are grouped by source type: Orbiter systems, on-board activities, payload operations, and unknown sources. The environment related to the Ku-band antenna dither, Orbiter structural modes, attitude deadband collapses, water dump operations, crew sleep, and crew exercise was comparable to the effects of these sources on previous Orbiter missions. Disturbances related to operations of the Isothermal Dendritic Growth Experiment and Space Acceleration Measurement Systems that were not observed on previous missions are detailed. The effects of Orbiter cabin and airlock depressurization and extravehicular activities are also reported for the first time. A set of data plots representing the entire mission is included in the CD-ROM version of this report.

  1. Spin force and torque in non-relativistic Dirac oscillator on a sphere

    NASA Astrophysics Data System (ADS)

    Shikakhwa, M. S.

    2018-03-01

    The spin force operator on a non-relativistic Dirac oscillator (in the non-relativistic limit the Dirac oscillator is a spin one-half 3D harmonic oscillator with strong spin-orbit interaction) is derived using the Heisenberg equations of motion and is seen to be formally similar to the force by the electromagnetic field on a moving charged particle. When confined to a sphere of radius R, it is shown that the Hamiltonian of this non-relativistic oscillator can be expressed as a mere kinetic energy operator with an anomalous part. As a result, the power by the spin force and torque operators in this case are seen to vanish. The spin force operator on the sphere is calculated explicitly and its torque is shown to be equal to the rate of change of the kinetic orbital angular momentum operator, again with an anomalous part. This, along with the conservation of the total angular momentum, suggests that the spin force exerts a spin-dependent torque on the kinetic orbital angular momentum operator in order to conserve total angular momentum. The presence of an anomalous spin part in the kinetic orbital angular momentum operator gives rise to an oscillatory behavior similar to the Zitterbewegung. It is suggested that the underlying physics that gives rise to the spin force and the Zitterbewegung is one and the same in NRDO and in systems that manifest spin Hall effect.

  2. Manned Orbital Transfer Vehicle (MOTV). Volume 3: Program requirements documents

    NASA Technical Reports Server (NTRS)

    Boyland, R. E.; Sherman, S. W.; Morfin, H. W.

    1979-01-01

    The requirements for geosynchronous orbit capability using the manned orbit transfer vehicle (MOTV) are defined. The program requirements, the mission requirements, and the system and subsystem requirements for the MOTV are discussed. The mission requirements include a geosynchronous Earth orbit vehicle for the construction, servicing, repair and operation of communications, solar power, and Earth observation satellites.

  3. Design and implementation of the flight dynamics system for COMS satellite mission operations

    NASA Astrophysics Data System (ADS)

    Lee, Byoung-Sun; Hwang, Yoola; Kim, Hae-Yeon; Kim, Jaehoon

    2011-04-01

    The first Korean multi-mission geostationary Earth orbit satellite, Communications, Ocean, and Meteorological Satellite (COMS) was launched by an Ariane 5 launch vehicle in June 26, 2010. The COMS satellite has three payloads including Ka-band communications, Geostationary Ocean Color Imager, and Meteorological Imager. Although the COMS spacecraft bus is based on the Astrium Eurostar 3000 series, it has only one solar array to the south panel because all of the imaging sensors are located on the north panel. In order to maintain the spacecraft attitude with 5 wheels and 7 thrusters, COMS should perform twice a day wheel off-loading thruster firing operations, which affect on the satellite orbit. COMS flight dynamics system provides the general on-station functions such as orbit determination, orbit prediction, event prediction, station-keeping maneuver planning, station-relocation maneuver planning, and fuel accounting. All orbit related functions in flight dynamics system consider the orbital perturbations due to wheel off-loading operations. There are some specific flight dynamics functions to operate the spacecraft bus such as wheel off-loading management, oscillator updating management, and on-station attitude reacquisition management. In this paper, the design and implementation of the COMS flight dynamics system is presented. An object oriented analysis and design methodology is applied to the flight dynamics system design. Programming language C# within Microsoft .NET framework is used for the implementation of COMS flight dynamics system on Windows based personal computer.

  4. S-NPP VIIRS Calibration and Performance Update

    NASA Technical Reports Server (NTRS)

    Xiong, X.; Cao, C.; Lei, N.; Chiang, K.; Blonski, S.; Butler, J.; Wang, Z.

    2016-01-01

    The first VIIRS instrument has successfully operated for more than 4 years on-board the Suomi-National Polar-orbiting Partnership (S-NPP) spacecraft. The sensor data records (SDR) derived from VIIRS on-orbit observations have been used to produce many environment data records (EDR), enabling a wide range of applications by the users from operational and research community. This paper provides an overview of instrument operations and its calibration activities, and presents an update of its radiometric performance, in terms of on-orbit changes in sensor spectral band responses and noise characterization. It also describes the effort made to improve sensor calibration, and the strategies developed in support of producing consistent SDR and, consequently, the EDR with improved quality.

  5. Propulsion Options for the LISA Mission

    NASA Technical Reports Server (NTRS)

    Cardiff, Eric H.; Marr, Gregory C.

    2004-01-01

    The LISA mission is a constellation of three spacecraft operating at 1 AU from the Sun in a position trailing the Earth. After launch, a propulsion module provides the AV necessary to reach this operational orbit, and separates from the spacecraft. A second propulsion system integrated with the spacecraft maintains the operational orbit and reduces nongravitational disturbances on the instruments. Both chemical and electrical propulsion systems were considered for the propulsion module, and this trade is presented to show the possible benefits of an EP system. Several options for the orbit maintenance and disturbance reduction system are also briefly discussed, along with several important requirements that suggest the use of a FEEP thruster system.

  6. An Engineering Trade Space Analysis for a Space-Based Hyperspectral Chromotomographic Scanner

    DTIC Science & Technology

    2009-03-26

    The Hyperion’s EO-1 host satellite is in a polar, circular, sun -synchronous or- bit at 98.7 inclination . The orbit follows that of Landsat-7 by one...science orbit around Mars 13 months after launch. The orbit is a near circular (apogee of 320 km, perigee of 255 km), near polar, sun -synchronous orbit ...payload design, operating scheme and orbit to demonstrate this technology in low- earth orbit . This instrument promises the capability of adding a time

  7. Space station orbit maintenance

    NASA Technical Reports Server (NTRS)

    Kaplan, D. I.; Jones, R. M.

    1983-01-01

    The orbit maintenance problem is examined for two low-earth-orbiting space station concepts - the large, manned Space Operations Center (SOC) and the smaller, unmanned Science and Applications Space Platform (SASP). Atmospheric drag forces are calculated, and circular orbit altitudes are selected to assure a 90 day decay period in the event of catastrophic propulsion system failure. Several thrusting strategies for orbit maintenance are discussed. Various chemical and electric propulsion systems for orbit maintenance are compared on the basis of propellant resupply requirements, power requirements, Shuttle launch costs, and technology readiness.

  8. Spitzer Space Telescope in-orbit checkout and science verification operations

    NASA Technical Reports Server (NTRS)

    Linick, Sue H.; Miles, John W.; Gilbert, John B.; Boyles, Carol A.

    2004-01-01

    Spitzer Space Telescope, the fourth and final of NASA's great observatories, and the first mission in NASA's Origins Program was launched 25 August 2003 into an Earth-trailing solar orbit. The observatory was designed to probe and explore the universe in the infrared. Before science data could be acquired, however, the observatory had to be initialized, characterized, calibrated, and commissioned. A two phased operations approach was defined to complete this work. These phases were identified as In-Orbit Checkout (IOC) and Science Verification (SV). Because the observatory lifetime is cryogen-limited these operations had to be highly efficient. The IOC/SV operations design accommodated a pre-defined distributed organizational structure and a complex, cryogenic flight system. Many checkout activities were inter-dependent, and therefore the operations concept and ground data system had to provide the flexibility required for a 'short turn-around' environment. This paper describes the adaptive operations system design and evolution, implementation, and lessons-learned from the completion of IOC/SV.

  9. Orbital transfer vehicle concept definition and system analysis study. Volume 1A: Executive summary. Phase 2

    NASA Technical Reports Server (NTRS)

    Ketchum, W. J.

    1986-01-01

    The objectives of the Phase 2 study were to improve the orbit transfer vehicle (OTV) concept definition by focusing on the following issues: the impact of mission requirements on OTV system design; OTV basing concepts on the Space Shuttle, separate platforms, and/or remote locations; cost reduction of an OTV program to improve its economic benefits and support its acquisition. The OTV mission scenario includes a wide range of missions the main drivers of which are manned GEO servicing, mid-inclination/polar DOD, and lunar/planetary projects. A mission model is presented which includes the type and number of missions per year and the estimated propellant requirements. To accomplish the missions, many OTV concepts were defined including ground-based OTVs launched either in the STS orbiter, the aft cargo carrier, or a heavy lift launch vehicle, and a space-based OTV. System and program trade studies were conducted using performance, cost, safety/risk, and operations/growth criteria. The study shows that mission requirements and substantial economic benefits justify a reusable, cryogenic (H2/O2) space-based OTV. Such a system would not be subjected to Earth-to-orbit launch loads and would not be constained in size or weight. Safety is enhanced by the fact that the system components are launched unfueled. Its inherent reusability and ability to be refueled in space make the space-based OTV very economical to operate.

  10. KSC-98pc189

    NASA Image and Video Library

    1998-01-21

    Astronaut Stephen Oswald, at left, listens to Ohio Senator John Glenn on the orbiter Columbia's middeck as the senator asks questions regarding Shuttle operations at the Orbiter Processing Facility 3 at Kennedy Space Center. Senator Glenn arrived at KSC on Jan. 20 to tour KSC operational areas and to view the launch of STS-89 later this week. Glenn, who made history in 1962 as the first American to orbit the Earth, completing three orbits in a five-hour flight aboard Friendship 7, will fly his second space mission aboard Space Shuttle Discovery this October. Glenn is retiring from the Senate at the end of this year and will be a payload specialist aboard STS-95

  11. Natural environment support guidelines for space shuttle tests and operations

    NASA Technical Reports Server (NTRS)

    Carter, E. A.; Brown, S. C.

    1974-01-01

    All space shuttle events from launch through solid rocket booster recovery and orbiter landing are considered in terms of constraints placed on those operations by the natural environment. Thunderstorm activity is discussed as an example of a possible hazard. The activities most likely to require advanced detection and monitoring techniques are identified as those from deorbit decision to Orbiter landing. The inflexible flight plan will require the transmission of real time wind profile information below 24 km and warnings of thunderstorms or turbulence in the Orbiter flight path. Extensive aerial reconnaissance and communication facilities and procedures to permit immediate transmission of aircraft reports to the mission control authority and to the Orbiter will also be required.

  12. LANDSAT-1 and LANDSAT-2 flight evaluation report

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The LANDSAT-1 spacecraft was launched from the Western Test Range on 23 July 1972, at 18:08:06.508Z. The launch and orbital injection phase of the space flight was nominal and deployment of the spacecraft followed predictions. Orbital operations of the spacecraft and payload subsystems were satisfactory through Orbit 147, after which an internal short circuit disabled one of the Wideband Video Tape Recorders (WBVTR-2). Operations resumed until Orbit 196, when the Return Beam Vidicon failed to respond when commanded off. The RBV was commanded off via alternate commands. LANDSAT-1 continued to perform its imaging mission with the Multispectral Scanner and the remaining Wideband Video Tape Recorder providing image data.

  13. TOPEX/POSEIDON operational orbit determination results using global positioning satellites

    NASA Technical Reports Server (NTRS)

    Guinn, J.; Jee, J.; Wolff, P.; Lagattuta, F.; Drain, T.; Sierra, V.

    1994-01-01

    Results of operational orbit determination, performed as part of the TOPEX/POSEIDON (T/P) Global Positioning System (GPS) demonstration experiment, are presented in this article. Elements of this experiment include the GPS satellite constellation, the GPS demonstration receiver on board T/P, six ground GPS receivers, the GPS Data Handling Facility, and the GPS Data Processing Facility (GDPF). Carrier phase and P-code pseudorange measurements from up to 24 GPS satellites to the seven GPS receivers are processed simultaneously with the GDPF software MIRAGE to produce orbit solutions of T/P and the GPS satellites. Daily solutions yield subdecimeter radial accuracies compared to other GPS, LASER, and DORIS precision orbit solutions.

  14. Establishing a Regulatory Framework for the Development & Operations of Sub-Orbital & Orbital Aircraft (SOA) in the EU

    NASA Astrophysics Data System (ADS)

    Marciacq, Jean-Bruno; Tomasello, Filippo; Erdelyi, Zsuzsanna; Gerhard, Michael

    2013-09-01

    The Treaty of the European Union allows for the development of common policies for all sectors of transport, including aviation, and its safety. To this end, the European legislator established in 2002 the European Aviation Safety Agency (EASA), located in Cologne, Germany, and gave it responsibility for the regulation of aviation safety, successively encompassing airworthiness, air operations and Flight Crew Licensing (FCL), Air Traffic Management (ATM), Air Navigation Systems (ANS), as well as Aerodromes (ADR).The Annexes 6 and 8 of the International Civil Aviation Organization (ICAO) to the Chicago Convention define an aircraft as "any machine that can derive support in the atmosphere from the reactions of the air other than the reactions of the air against the earth's surface". The aerodynamic lift generated during the atmospheric part of the flight is commonly used to sustain and control the vehicle, that is to take-off, climb, pull-up, perform manoeuvres, fly back to the airport and land. Thus, Sub- orbital and Orbital Aircraft (SOA) are considered to be aircraft, as opposed to rockets which are symmetrical bodies not generating lift, and solely sustained by their rocket engine(s).Consequently, the regulation of SOA airworthiness, their crew, operations, insertion into the traffic and utilisation of aerodromes would in principle fall under the remit of EASA, which would have to fulfil its role of protection of the European citizens in relation to civil suborbital and orbital flights, that is to certify SOAs and their operations before they would be operated for Commercial Transport in the EU.Since EASA was first contacted by potential applicants in 2007, many projects have developed and the context has evolved. Thus, this paper intends to update the approach initially proposed at the 3rd IAASS in Rome in October 2008 and complemented at the 4th IAASS in Huntsville in May 2010 to accommodate sub-orbital and orbital aircraft into the EU regulatory system, and to establish a consistent regulatory framework to allow safe and environmentally controlled operations of SOA in Europe. For further legal and technical details, please refer to the corresponding IAASS-published papers.

  15. Hybrid procedure for orbital venous malformation in the endovascular operation room.

    PubMed

    Cheng, A C O; Li, E Y M; Chan, T C Y; Wong, A C W; Chan, P C M; Poon, W W L; Fung, D H S; Yuen, H K L

    2015-08-01

    To describe a hybrid procedure for orbital venous malformation in the endovascular operating room (EVOR). Five consecutive patients with venous malformation in the periocular and orbital region were included. All patients received a one-stage direct puncture venogram, image-guided glue injection, and surgical resection in the EVOR equipped with a biplane digital subtraction angiography system (BDSAS). The mean age at the time of operation was 37.4 years (range, 22-69 years). The mean operative time was 193 min (range, 138-324 min). No intraoperative complications were noted. The mean follow-up duration was 18.8 months (range, 10-24 months). Three patients had complete removal of the vascular lesions. At the latest follow-up, no recurrence of symptoms related to the lesions was noted. All patients had an uneventful recovery and satisfactory outcome. The hybrid procedure of orbital venous malformation in the EVOR is a novel application in ophthalmology. It is a safe and well-controlled procedure with real-time high-quality BDSAS surveillance to facilitate surgical resection. Its success requires collaboration between the interventional radiologist, the surgeon, and the ophthalmologist.

  16. Earth orbital operations supporting manned interplanetary missions

    NASA Astrophysics Data System (ADS)

    Sherwood, Brent; Buddington, Patricia A.; Whittaker, William L.

    The orbital operations required to accumulate, assemble, test, verify, maintain, and launch complex manned space systems on interplanetary missions from earth orbit are as vital as the flight hardware itself. Vast numbers of orbital crew are neither necessary nor desirable for accomplishing the required tasks. A suite of robotic techniques under human supervisory control, relying on sensors, software and manipulators either currently emergent or already applied in terrestrial settings, can make the job tractable. The mission vehicle becomes largely self-assembling, using its own rigid aerobrake as a work platform. The Space Station, having been used as a laboratory testbed and to house an assembly crew of four, is not dominated by the process. A feasible development schedule, if begun soon, could emplace orbital support technologies for exploration missions in time for a 2004 first interplanetary launch.

  17. Modeling of the Orbital Debris Environment Risks in the Past, Present, and Future

    NASA Technical Reports Server (NTRS)

    Matney, Mark

    2016-01-01

    Despite of the tireless work by space surveillance assets, much of the Earth debris environment is not easily measured or tracked. For every object that is in an orbit we can track, there are hundreds of small debris that are too small to be tracked but still large enough to damage spacecraft. In addition, even if we knew today's environment with perfect knowledge, the debris environment is dynamic and would change tomorrow. Therefore, orbital debris scientists rely on numerical modeling to understand the nature of the debris environment and its risk to space operations throughout Earth orbit and into the future. This talk will summarize the ways in which modeling complements measurements to help give us a better picture of what is occurring in Earth orbit, and helps us to better conduct current and future space operations.

  18. Theoretical treatment of the spin-orbit coupling in the rare gas oxides NeO, ArO, KrO, and XeO

    NASA Technical Reports Server (NTRS)

    Langhoff, S. R.

    1980-01-01

    Off-diagonal spin-orbit matrix elements are calculated as a function of internuclear distance for the rare gas oxides NeO, ArO, KrO, and XeO using the full microscopic spin-orbit Hamiltonian, including all one- and two-electron integrals, and POL-CI wave functions comparable to those of Dunning and Hay (1977). A good agreement was found when comparing these results in detail with the calculations of Cohen, Wadt and Hay (1979) that utilize an effective one-electron one-center spin-orbit operator. For the rare gas oxide molecules, it is suggested that the numerical results are a more sensitive test of the wave functions (particularly to the extent of charge transfer) than the exact evaluation of all terms in the full spin-orbit operator.

  19. Earth orbital operations supporting manned interplanetary missions

    NASA Technical Reports Server (NTRS)

    Sherwood, Brent; Buddington, Patricia A.; Whittaker, William L.

    1989-01-01

    The orbital operations required to accumulate, assemble, test, verify, maintain, and launch complex manned space systems on interplanetary missions from earth orbit are as vital as the flight hardware itself. Vast numbers of orbital crew are neither necessary nor desirable for accomplishing the required tasks. A suite of robotic techniques under human supervisory control, relying on sensors, software and manipulators either currently emergent or already applied in terrestrial settings, can make the job tractable. The mission vehicle becomes largely self-assembling, using its own rigid aerobrake as a work platform. The Space Station, having been used as a laboratory testbed and to house an assembly crew of four, is not dominated by the process. A feasible development schedule, if begun soon, could emplace orbital support technologies for exploration missions in time for a 2004 first interplanetary launch.

  20. Space Operations Center system analysis study extension. Volume 2: Programmatics and cost

    NASA Technical Reports Server (NTRS)

    1982-01-01

    A summary of Space Operations Center (SOC) orbital space station costs, program options and program recommendations is presented. Program structure, hardware commonality, schedules and program phasing are considered. Program options are analyzed with respect to mission needs, design and technology options, and anticipated funding constraints. Design and system options are discussed.

  1. Specific SPS construction studies: Operations and maintenance

    NASA Technical Reports Server (NTRS)

    Miller, K. H.

    1980-01-01

    Surface as well as in-space operations of the solar power satellite program are addressed. The primary end products of SPS industrial enterprise are shown SPS and its ground receiving antenna every six months; and (3) construction of electric cargo orbital transfer vehicles. The production of photovoltaic cells and solar blankets is also considered.

  2. Providing relay communications support for the Mars Environmental Survey (MESUR) mission

    NASA Technical Reports Server (NTRS)

    Swenson, Byron L.; Friedlander, Alan L.

    1992-01-01

    The purpose of the Mars Environmental Survey (MESUR) mission is to put in place, over several launch opportunities, a constellation of Mars landers to make long-term surface observations of the circulation of the atmosphere and changes in climate, and to record the seismic activity of the planetary crust. Short-term objectives will also be addressed. An orbital communications infrastructure capable of providing regular high-rate data transfer to earth from the landers, which are scattered globally from pole to pole, is key to accomplishing the mission goals. A study is thereby presented of the orbit selection for the orbiter spacecraft, which will provide this support, and the relay communications operation. It is concluded that adequate communications support for the objectives of the MESUR mission can be provided by a single orbiter, provided care is taken in the selection of the size and orientation (i.e., inclination and apse line alignment) of the spacecraft orbit.

  3. Study on the description method of upper limb's muscle force levels during simulated in-orbit operations

    NASA Astrophysics Data System (ADS)

    Zhao, Yan; Li, DongXu; Liu, ZhiZhen; Liu, Liang

    2013-03-01

    The dexterous upper limb serves as the most important tool for astronauts to implement in-orbit experiments and operations. This study developed a simulated weightlessness experiment and invented new measuring equipment to quantitatively evaluate the muscle ability of the upper limb. Isometric maximum voluntary contractions (MVCs) and surface electromyography (sEMG) signals of right-handed pushing at the three positions were measured for eleven subjects. In order to enhance the comprehensiveness and accuracy of muscle force assessment, the study focused on signal processing techniques. We applied a combination method, which consists of time-, frequency-, and bi-frequency-domain analyses. Time- and frequency-domain analyses estimated the root mean square (RMS) and median frequency (MDF) of sEMG signals, respectively. Higher order spectra (HOS) of bi-frequency domain evaluated the maximum bispectrum amplitude ( B max), Gaussianity level (Sg) and linearity level (S l ) of sEMG signals. Results showed that B max, S l , and RMS values all increased as force increased. MDF and Sg values both declined as force increased. The research demonstrated that the combination method is superior to the conventional time- and frequency-domain analyses. The method not only described sEMG signal amplitude and power spectrum, but also deeper characterized phase coupling information and non-Gaussianity and non-linearity levels of sEMG, compared to two conventional analyses. The finding from the study can aid ergonomist to estimate astronaut muscle performance, so as to optimize in-orbit operation efficacy and minimize musculoskeletal injuries.

  4. A review of findings of a study of rocket based combined cycle engines applied to extensively axisymmetric single stage to orbit vehicles

    NASA Technical Reports Server (NTRS)

    Foster, Richard W.

    1992-01-01

    Extensively axisymmetric and non-axisymmetric Single Stage To Orbit (SSTO) vehicles are considered. The information is presented in viewgraph form and the following topics are presented: payload comparisons; payload as a percent of dry weight - a system hardware cost indicator; life cycle cost estimations; operations and support costs estimation; selected engine type; and rocket engine specific impulse calculation.

  5. A superconducting quenchgun for delivering lunar derived oxygen to lunar orbit

    NASA Technical Reports Server (NTRS)

    Nottke, Nathan; Bilby, Curt R.

    1990-01-01

    The development of a parametric model for a superconducting quenchgun for launching lunar derived liquid oxygen to lunar orbit is detailed. An overview is presented of the quenchgun geometry and operating principles, a definition of the required support systems, and the methods used to size the quenchgun launcher and support systems. An analysis assessing the impact of a lunar quenchgun on the OEXP Lunar Evolution Case Study is included.

  6. Study to investigate and evaluate means of optimizing the Ku-band combined radar/communication functions for the space shuttle

    NASA Technical Reports Server (NTRS)

    Weber, C. L.; Alem, W. K.; Simon, M. K.

    1977-01-01

    The Ku band radar system on the shuttle orbiter operates in both a search and a tracking mode, and its transmitter and antennas share time with the communication mode in the integrated system. The power allocation properties and the Costa subloop subcarrier tracking performance associated with the baseline digital phase shift implementation of the three channel orbiter Ku band modulator are discussed.

  7. Study of an astronomical extreme ultraviolet rocket spectrometer for use on shuttle missions

    NASA Technical Reports Server (NTRS)

    Bowyer, C. S.

    1977-01-01

    The adaptation of an extreme ultraviolet astronomy rocket payload for flight on the shuttle was studied. A sample payload for determining integration and flight procedures for experiments which may typically be flown on shuttle missions was provided. The electrical, mechanical, thermal, and operational interface requirements between the payload and the orbiter were examined. Of particular concern was establishing a baseline payload accommodation which utilizes proven common hardware for electrical, data, command, and possibly real time monitoring functions. The instrument integration and checkout procedures necessary to assure satisfactory in-orbit instrument performance were defined and those procedures which can be implemented in such a way as to minimize their impact on orbiter integration schedules were identified.

  8. KSC-08pd1652

    NASA Image and Video Library

    2008-06-10

    CAPE CANAVERAL, Fla. – In Orbiter Processing Facility bay No. 2, technicians begin installation of an auxiliary power unit 3, or APU3, in space shuttle Endeavour for the STS-126 mission. The auxiliary power unit is a hydrazine-fueled, turbine-driven power unit that generates mechanical shaft power to drive a hydraulic pump that produces pressure for the orbiter's hydraulic system. There are three separate APUs, three hydraulic pumps and three hydraulic systems, located in the aft fuselage of the orbiter. When the three auxiliary power units are started five minutes before lift-off, the hydraulic systems are used to position the three main engines for activation, control various propellant valves on the engines and position orbiter aerosurfaces. The auxiliary power units are not operated after the first orbital maneuvering system thrusting period because hydraulic power is no longer required. One power unit is operated briefly one day before deorbit to support checkout of the orbiter flight control system. One auxiliary power unit is restarted before the deorbit thrusting period. The two remaining units are started after the deorbit thrusting maneuver and operate continuously through entry, landing and landing rollout. On STS-126, Endeavour will deliver a multi-purpose logistics module to the International Space Station. Launch is targeted for Nov. 10. Photo credit: NASA/Kim Shiflett

  9. KSC-08pd1651

    NASA Image and Video Library

    2008-06-10

    CAPE CANAVERAL, Fla. – In Orbiter Processing Facility bay No. 2, technicians begin installation of an auxiliary power unit 3, or APU3, in space shuttle Endeavour for the STS-126 mission. The auxiliary power unit is a hydrazine-fueled, turbine-driven power unit that generates mechanical shaft power to drive a hydraulic pump that produces pressure for the orbiter's hydraulic system. There are three separate APUs, three hydraulic pumps and three hydraulic systems, located in the aft fuselage of the orbiter. When the three auxiliary power units are started five minutes before lift-off, the hydraulic systems are used to position the three main engines for activation, control various propellant valves on the engines and position orbiter aerosurfaces. The auxiliary power units are not operated after the first orbital maneuvering system thrusting period because hydraulic power is no longer required. One power unit is operated briefly one day before deorbit to support checkout of the orbiter flight control system. One auxiliary power unit is restarted before the deorbit thrusting period. The two remaining units are started after the deorbit thrusting maneuver and operate continuously through entry, landing and landing rollout. On STS-126, Endeavour will deliver a multi-purpose logistics module to the International Space Station. Launch is targeted for Nov. 10. Photo credit: NASA/Kim Shiflett

  10. KSC-08pd1654

    NASA Image and Video Library

    2008-06-10

    CAPE CANAVERAL, Fla. – In Orbiter Processing Facility bay No. 2, auxiliary power unit 3, or APU3, is in place on space shuttle Endeavour for the STS-126 mission. The auxiliary power unit is a hydrazine-fueled, turbine-driven power unit that generates mechanical shaft power to drive a hydraulic pump that produces pressure for the orbiter's hydraulic system. There are three separate APUs, three hydraulic pumps and three hydraulic systems, located in the aft fuselage of the orbiter. When the three auxiliary power units are started five minutes before lift-off, the hydraulic systems are used to position the three main engines for activation, control various propellant valves on the engines and position orbiter aerosurfaces. The auxiliary power units are not operated after the first orbital maneuvering system thrusting period because hydraulic power is no longer required. One power unit is operated briefly one day before deorbit to support checkout of the orbiter flight control system. One auxiliary power unit is restarted before the deorbit thrusting period. The two remaining units are started after the deorbit thrusting maneuver and operate continuously through entry, landing and landing rollout. On STS-126, Endeavour will deliver a multi-purpose logistics module to the International Space Station. Launch is targeted for Nov. 10. Photo credit: NASA/Kim Shiflett

  11. KSC-08pd1653

    NASA Image and Video Library

    2008-06-10

    CAPE CANAVERAL, Fla. – In Orbiter Processing Facility bay No. 2, technicians install auxiliary power unit 3, or APU3, in space shuttle Endeavour for the STS-126 mission. The auxiliary power unit is a hydrazine-fueled, turbine-driven power unit that generates mechanical shaft power to drive a hydraulic pump that produces pressure for the orbiter's hydraulic system. There are three separate APUs, three hydraulic pumps and three hydraulic systems, located in the aft fuselage of the orbiter. When the three auxiliary power units are started five minutes before lift-off, the hydraulic systems are used to position the three main engines for activation, control various propellant valves on the engines and position orbiter aerosurfaces. The auxiliary power units are not operated after the first orbital maneuvering system thrusting period because hydraulic power is no longer required. One power unit is operated briefly one day before deorbit to support checkout of the orbiter flight control system. One auxiliary power unit is restarted before the deorbit thrusting period. The two remaining units are started after the deorbit thrusting maneuver and operate continuously through entry, landing and landing rollout. On STS-126, Endeavour will deliver a multi-purpose logistics module to the International Space Station. Launch is targeted for Nov. 10. Photo credit: NASA/Kim Shiflett

  12. Spacecraft Onboard Software Maintenance: An Effective Approach which Reduces Costs and Increases Science Return

    NASA Technical Reports Server (NTRS)

    Shell, Elaine M.; Lue, Yvonne; Chu, Martha I.

    1999-01-01

    Flight software (FSW) is a mission critical element of spacecraft functionality and performance. When ground operations personnel interface to a spacecraft, they are dealing almost entirely with onboard software. This software, even more than ground/flight communications systems, is expected to perform perfectly at all times during all phases of on-orbit mission life. Due to the fact that FSW can be reconfigured and reprogrammed to accommodate new spacecraft conditions, the on-orbit FSW maintenance team is usually significantly responsible for the long-term success of a science mission. Failure of FSW can result in very expensive operations work-around costs and lost science opportunities. There are three basic approaches to staffing on-orbit software maintenance, namely: (1) using the original developers, (2) using mission operations personnel, or (3) assembling a Center of Excellence for multi-spacecraft on-orbit FSW support. This paper explains a National Aeronautics and Space Administration, Goddard Space Flight Center (NASA/GSFC) experience related to the roles of on-orbit FSW maintenance personnel. It identifies the advantages and disadvantages of each of the three approaches to staffing the FSW roles, and demonstrates how a cost efficient on-orbit FSW Maintenance Center of Excellence can be established and maintained with significant return on the investment.

  13. NAVIGATION PERFORMANCE IN HIGH EARTH ORBITS USING NAVIGATOR GPS RECEIVER

    NASA Technical Reports Server (NTRS)

    Bamford, William; Naasz, Bo; Moreau, Michael C.

    2006-01-01

    NASA GSFC has developed a GPS receiver that can acquire and track GPS signals with sensitivity significantly lower than conventional GPS receivers. This opens up the possibility of using GPS based navigation for missions in high altitude orbit, such as Geostationary Operational Environmental Satellites (GOES) in a geostationary orbit, and the Magnetospheric MultiScale (MMS) Mission, in highly eccentric orbits extending to 12 Earth radii and higher. Indeed much research has been performed to study the feasibility of using GPS navigation in high Earth orbits and the performance achievable. Recently, GSFC has conducted a series of hardware in-the-loop tests to assess the performance of this new GPS receiver in various high Earth orbits of interest. Tracking GPS signals to down to approximately 22-25 dB-Hz, including signals from the GPS transmitter side-lobes, steady-state navigation performance in a geostationary orbit is on the order of 10 meters. This paper presents the results of these tests, as well as sensitivity analysis to such factors as ionosphere masks, use of GPS side-lobe signals, and GPS receiver sensitivity.

  14. Telerobotic on-orbit remote fluid resupply system

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The development of a telerobotic on-orbit fluid resupply demonstration system is described. A fluid transfer demonstration system was developed which functionally simulates operations required to remotely transfer fluids (liquids or gases) from a servicing spacecraft to a receiving spacecraft through the use of telerobotic manipulations. The fluid system is representative of systems used by current or planned spacecraft and propulsion stages requiring on-orbit remote resupply. The system was integrated with an existing MSFC remotely controlled manipulator arm to mate/demate couplings for demonstration and evaluation of a complete remotely operated fluid transfer system.

  15. The use of computer graphic simulation in the development of on-orbit tele-robotic systems

    NASA Technical Reports Server (NTRS)

    Fernandez, Ken; Hinman, Elaine

    1987-01-01

    This paper describes the use of computer graphic simulation techniques to resolve critical design and operational issues for robotic systems used for on-orbit operations. These issues are robot motion control, robot path-planning/verification, and robot dynamics. The major design issues in developing effective telerobotic systems are discussed, and the use of ROBOSIM, a NASA-developed computer graphic simulation tool, to address these issues is presented. Simulation plans for the Space Station and the Orbital Maneuvering Vehicle are presented and discussed.

  16. Aquarius Radiometer Performance: Early On-Orbit Calibration and Results

    NASA Technical Reports Server (NTRS)

    Piepmeier, Jeffrey R.; LeVine, David M.; Yueh, Simon H.; Wentz, Frank; Ruf, Christopher

    2012-01-01

    The Aquarius/SAC-D observatory was launched into a 657-km altitude, 6-PM ascending node, sun-synchronous polar orbit from Vandenberg, California, USA on June 10, 2011. The Aquarius instrument was commissioned two months after launch and began operating in mission mode August 25. The Aquarius radiometer meets all engineering requirements, exhibited initial calibration biases within expected error bars, and continues to operate well. A review of the instrument design, discussion of early on-orbit performance and calibration assessment, and investigation of an on-going calibration drift are summarized in this abstract.

  17. A fully-neoclassical finite-orbit-width version of the CQL3D Fokker–Planck code

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Petrov, Yu V.; Harvey, R. W.

    The time-dependent bounce-averaged CQL3D flux-conservative finite-difference Fokker–Planck equation (FPE) solver has been upgraded to include finite-orbit-width (FOW) capabilities which are necessary for an accurate description of neoclassical transport, losses to the walls, and transfer of particles, momentum, and heat to the scrape-off layer. The FOW modifications are implemented in the formulation of the neutral beam source, collision operator, RF quasilinear diffusion operator, and in synthetic particle diagnostics. The collisional neoclassical radial transport appears naturally in the FOW version due to the orbit-averaging of local collision coefficients coupled with transformation coefficients from local (R, Z) coordinates along each guiding-center orbit tomore » the corresponding midplane computational coordinates, where the FPE is solved. In a similar way, the local quasilinear RF diffusion terms give rise to additional radial transport of orbits. We note that the neoclassical results are obtained for ‘full’ orbits, not dependent on a common small orbit-width approximation. Results of validation tests for the FOW version are also presented.« less

  18. A fully-neoclassical finite-orbit-width version of the CQL3D Fokker–Planck code

    DOE PAGES

    Petrov, Yu V.; Harvey, R. W.

    2016-09-08

    The time-dependent bounce-averaged CQL3D flux-conservative finite-difference Fokker–Planck equation (FPE) solver has been upgraded to include finite-orbit-width (FOW) capabilities which are necessary for an accurate description of neoclassical transport, losses to the walls, and transfer of particles, momentum, and heat to the scrape-off layer. The FOW modifications are implemented in the formulation of the neutral beam source, collision operator, RF quasilinear diffusion operator, and in synthetic particle diagnostics. The collisional neoclassical radial transport appears naturally in the FOW version due to the orbit-averaging of local collision coefficients coupled with transformation coefficients from local (R, Z) coordinates along each guiding-center orbit tomore » the corresponding midplane computational coordinates, where the FPE is solved. In a similar way, the local quasilinear RF diffusion terms give rise to additional radial transport of orbits. We note that the neoclassical results are obtained for ‘full’ orbits, not dependent on a common small orbit-width approximation. Results of validation tests for the FOW version are also presented.« less

  19. Angles-only relative orbit determination in low earth orbit

    NASA Astrophysics Data System (ADS)

    Ardaens, Jean-Sébastien; Gaias, Gabriella

    2018-06-01

    The paper provides an overview of the angles-only relative orbit determination activities conducted to support the Autonomous Vision Approach Navigation and Target Identification (AVANTI) experiment. This in-orbit endeavor was carried out by the German Space Operations Center (DLR/GSOC) in autumn 2016 to demonstrate the capability to perform spaceborne autonomous close-proximity operations using solely line-of-sight measurements. The images collected onboard have been reprocessed by an independent on-ground facility for precise relative orbit determination, which served as ultimate instance to monitor the formation safety and to characterize the onboard navigation and control performances. During two months, several rendezvous have been executed, generating a valuable collection of images taken at distances ranging from 50 km to only 50 m. Despite challenging experimental conditions characterized by a poor visibility and strong orbit perturbations, angles-only relative positioning products could be continuously derived throughout the whole experiment timeline, promising accuracy at the meter level during the close approaches. The results presented in the paper are complemented with former angles-only experience gained with the PRISMA satellites to better highlight the specificities induced by different orbits and satellite designs.

  20. A New Theory of Trajectory Design and NASA's Vision

    NASA Technical Reports Server (NTRS)

    Folta, David

    2006-01-01

    This new theory is defined as the use of chaos to design trajectories and orbits that can be used to meet complex mission goals. The benefits are; a) minimizes fuel costs; b) optimizes trajectory profiles; c) provides non-standard and new orbit designs; and d) mitigates operational risks. Other synonymous terms include dynamical systems, invariant manifolds, capture orbits and ballistic orbits.

  1. Inclusion of orbital relaxation and correlation through the unitary group adapted open shell coupled cluster theory using non-relativistic and scalar relativistic Hamiltonians to study the core ionization potential of molecules containing light to medium-heavy elements

    NASA Astrophysics Data System (ADS)

    Sen, Sangita; Shee, Avijit; Mukherjee, Debashis

    2018-02-01

    The orbital relaxation attendant on ionization is particularly important for the core electron ionization potential (core IP) of molecules. The Unitary Group Adapted State Universal Coupled Cluster (UGA-SUMRCC) theory, recently formulated and implemented by Sen et al. [J. Chem. Phys. 137, 074104 (2012)], is very effective in capturing orbital relaxation accompanying ionization or excitation of both the core and the valence electrons [S. Sen et al., Mol. Phys. 111, 2625 (2013); A. Shee et al., J. Chem. Theory Comput. 9, 2573 (2013)] while preserving the spin-symmetry of the target states and using the neutral closed-shell spatial orbitals of the ground state. Our Ansatz invokes a normal-ordered exponential representation of spin-free cluster-operators. The orbital relaxation induced by a specific set of cluster operators in our Ansatz is good enough to eliminate the need for different sets of orbitals for the ground and the core-ionized states. We call the single configuration state function (CSF) limit of this theory the Unitary Group Adapted Open-Shell Coupled Cluster (UGA-OSCC) theory. The aim of this paper is to comprehensively explore the efficacy of our Ansatz to describe orbital relaxation, using both theoretical analysis and numerical performance. Whenever warranted, we also make appropriate comparisons with other coupled-cluster theories. A physically motivated truncation of the chains of spin-free T-operators is also made possible by the normal-ordering, and the operational resemblance to single reference coupled-cluster theory allows easy implementation. Our test case is the prediction of the 1s core IP of molecules containing a single light- to medium-heavy nucleus and thus, in addition to demonstrating the orbital relaxation, we have addressed the scalar relativistic effects on the accuracy of the IPs by using a hierarchy of spin-free Hamiltonians in conjunction with our theory. Additionally, the contribution of the spin-free component of the two-electron Gaunt term, not usually taken into consideration, has been estimated at the Self-Consistent Field (ΔSCF) level and is found to become increasingly important and eventually quite prominent for molecules with third period atoms and below. The accuracies of the IPs computed using UGA-OSCC are found to be of the same order as the Coupled Cluster Singles Doubles (ΔCCSD) values while being free from spin contamination. Since the UGA-OSCC uses a common set of orbitals for the ground state and the ion, it obviates the need of two N5 AO to MO transformation in contrast to the ΔCCSD method.

  2. Inclusion of orbital relaxation and correlation through the unitary group adapted open shell coupled cluster theory using non-relativistic and scalar relativistic Hamiltonians to study the core ionization potential of molecules containing light to medium-heavy elements.

    PubMed

    Sen, Sangita; Shee, Avijit; Mukherjee, Debashis

    2018-02-07

    The orbital relaxation attendant on ionization is particularly important for the core electron ionization potential (core IP) of molecules. The Unitary Group Adapted State Universal Coupled Cluster (UGA-SUMRCC) theory, recently formulated and implemented by Sen et al. [J. Chem. Phys. 137, 074104 (2012)], is very effective in capturing orbital relaxation accompanying ionization or excitation of both the core and the valence electrons [S. Sen et al., Mol. Phys. 111, 2625 (2013); A. Shee et al., J. Chem. Theory Comput. 9, 2573 (2013)] while preserving the spin-symmetry of the target states and using the neutral closed-shell spatial orbitals of the ground state. Our Ansatz invokes a normal-ordered exponential representation of spin-free cluster-operators. The orbital relaxation induced by a specific set of cluster operators in our Ansatz is good enough to eliminate the need for different sets of orbitals for the ground and the core-ionized states. We call the single configuration state function (CSF) limit of this theory the Unitary Group Adapted Open-Shell Coupled Cluster (UGA-OSCC) theory. The aim of this paper is to comprehensively explore the efficacy of our Ansatz to describe orbital relaxation, using both theoretical analysis and numerical performance. Whenever warranted, we also make appropriate comparisons with other coupled-cluster theories. A physically motivated truncation of the chains of spin-free T-operators is also made possible by the normal-ordering, and the operational resemblance to single reference coupled-cluster theory allows easy implementation. Our test case is the prediction of the 1s core IP of molecules containing a single light- to medium-heavy nucleus and thus, in addition to demonstrating the orbital relaxation, we have addressed the scalar relativistic effects on the accuracy of the IPs by using a hierarchy of spin-free Hamiltonians in conjunction with our theory. Additionally, the contribution of the spin-free component of the two-electron Gaunt term, not usually taken into consideration, has been estimated at the Self-Consistent Field (ΔSCF) level and is found to become increasingly important and eventually quite prominent for molecules with third period atoms and below. The accuracies of the IPs computed using UGA-OSCC are found to be of the same order as the Coupled Cluster Singles Doubles (ΔCCSD) values while being free from spin contamination. Since the UGA-OSCC uses a common set of orbitals for the ground state and the ion, it obviates the need of two N 5 AO to MO transformation in contrast to the ΔCCSD method.

  3. Medium Earth Orbit Scatterometer (MEOScat) Concept Phase Study

    NASA Technical Reports Server (NTRS)

    Spencer, Michael W.

    2004-01-01

    In this report, advanced scatterometer concept options to operate in the post-SeaWinds era are examined. In order to meet the future requirements of scientific and operational users, a variety of scatterometer systems capable of producing improved wind vector products are evaluated. Special emphasis is placed on addressing concept options that operate at higher altitudes in order to improve the temporal revisit time. A preliminary set of generalized wind measurement goals designed to meet the future needs of both scientific and operational communities is put forth. Geophysically based measurement constraints (such as allowable carrier frequencies and measurement incidence angles) are identified. It was found that a potential key constraint at higher satellite altitudes is the longer time required to make all of the azimuth measurements. The revisit and coverage characteristics of a variety of platform orbits throughout the MEO range is studied in detail, and a discussion of the associated increase in radiation is presented. The "trade space" of scatterometer architectures and design options, along with associated advantages and disadvantages, is described for mission options in the MEO range. Finally, key technology studies that will enable further development of a MEO scatterometer mission are identified.

  4. Technology requirements for future Earth-to-geosynchronous orbit transportation systems. Volume 2: Technical results

    NASA Technical Reports Server (NTRS)

    Caluori, V. A.

    1980-01-01

    Technologies either critical to performance of offering cost advantages compared to the investment required to bring them to usable confidence levels are identified. A total transportation system is used as an evaluation yardstick. Vehicles included in the system are a single stage to orbit launch vehicle used in a priority cargo role, a matching orbit transfer vehicle, a heavy lift launch vehicle with a low Earth orbit delivery capability of 226, 575 kg, and a matching solar electric cargo orbit transfer vehicle. The system and its reference technology level are consistent with an initial operational capability in 1990. The 15 year mission scenario is based on early space industrialization leading to the deployment of large systems such as power satellites. Life cycle cost benefits in discounted and undiscounted dollars for each vehicle, technology advancement, and the integrated transportation system are calculated. A preliminary functional analysis was made of the operational support requirements for ground based and space based chemical propulsion orbit transfer vehicles.

  5. Space station utilization and commonality

    NASA Technical Reports Server (NTRS)

    Butler, John

    1986-01-01

    Several potential ways of utilizing the space station, including utilization of learning experiences (such as operations), utilization of specific elements of hardware which can be largely common between the SS and Mars programs, and utilization of the on-orbit SS for transportation node functions were identified and discussed. The probability of using the SS in all of these areas seems very good. Three different ways are discussed of utilizing the then existing Low Earth Orbit (LEO) SS for operational support during assembly and checkout of the Mars Space Vehicle (SV): attaching the SV to the SS; allowing the SV to co-orbit near the SS; and a hybrid of the first 2 ways. Discussion of each of these approaches is provided, and the conclusion is reached that either the co-orbiting or hybrid approach might be preferable. Artists' conception of the modes are provided, and sketches of an assembly system concept (truss structure and subsystems derivable from the SS) which could be used for co-orbiting on-orbit assembly support are provided.

  6. Application of Rapid Prototyping Technique and Intraoperative Navigation System for the Repair and Reconstruction of Orbital Wall Fractures

    PubMed Central

    Cha, Jong Hyun; Lee, Yong Hae; Ruy, Wan Chul; Roe, Young; Moon, Myung Ho

    2016-01-01

    Background Restoring the orbital cavity in large blow out fractures is a challenge for surgeons due to the anatomical complexity. This study evaluated the clinical outcomes and orbital volume after orbital wall fracture repair using a rapid prototyping (RP) technique and intraoperative navigation system. Methods This prospective study was conducted on the medical records and radiology records of 12 patients who had undergone a unilateral blow out fracture reconstruction using a RP technique and an intraoperative navigation system from November 2014 to March 2015. The surgical results were assessed by an ophthalmic examination and a comparison of the preoperative and postoperative orbital volume ratio (OVR) values. Results All patients had a successful treatment outcome without complications. Volumetric analysis revealed a significant decrease in the mean OVR from 1.0952±0.0662 (ranging from 0.9917 to 1.2509) preoperatively to 0.9942±0.0427 (ranging from 0.9394 to 1.0680) postoperatively. Conclusion The application of a RP technique for the repair of orbital wall fractures is a useful tool that may help improve the clinical outcomes by understanding the individual anatomy, determining the operability, and restoring the orbital cavity volume through optimal implant positioning along with an intraoperative navigation system. PMID:28913272

  7. Tracking On-Orbit Stability of the Response Versus Scan Angle for the S-NPP VIIRS Reflective Solar Bands

    NASA Technical Reports Server (NTRS)

    Wu, Aisheng; Xiong, Xiaoxiong; Cao, Changyong

    2016-01-01

    The Visible Infrared Imaging Radiometer Suite (VIIRS) on the Suomi NPP (National Polar-orbiting Partnership) satellite (http:npp.gsfc.nasa.govviirs.html) has been in operation for nearly five years. The onboard calibration of the VIIRS reflective solar bands (RSB) relies on a solar diffuser (SD) located at a fixed scan angle and a solar diffuser stability monitor (SDSM). The VIIRS response versus scan angle (RVS) was characterized prelaunch in ambient conditions and is currently used to determine the on-orbit response for all scan angles relative to the SD scan angle. Since the RVS is vitally important to the quality of calibrated level 1B products, it is important to monitor its on-orbit stability. In this study, the RVS stability is examined based on reflectance trends collected from 16-day repeatable orbits over pre-selected pseudo-invariant desert sites in Northern Africa. These trends nearly cover the entire Earth view scan range so that any systematic drifts in the scan angle direction would indicate a change in RVS. This study also compares VIIRS RVS on-orbit stability results with those from both Aqua and Terra MODIS over the first four years of mission for a few selected bands, which provides further information on potential VIIRS RVS on-orbit changes.

  8. Shuttle cryogenics supply system. Optimization study. Volume 5 B-4: Programmers manual for space shuttle orbit injection analysis (SOPSA)

    NASA Technical Reports Server (NTRS)

    1973-01-01

    A computer program for space shuttle orbit injection propulsion system analysis (SOPSA) is described to show the operational characteristics and the computer system requirements. The program was developed as an analytical tool to aid in the preliminary design of propellant feed systems for the space shuttle orbiter main engines. The primary purpose of the program is to evaluate the propellant tank ullage pressure requirements imposed by the need to accelerate propellants rapidly during the engine start sequence. The SOPSA program will generate parametric feed system pressure histories and weight data for a range of nominal feedline sizes.

  9. Applications technology satellites advanced mission study

    NASA Technical Reports Server (NTRS)

    Gould, L. M.

    1972-01-01

    Three spacecraft configurations were designed for operation as a high powered synchronous communications satellite. Each spacecraft includes a 1 kw TWT and a 2 kw Klystron power amplifier feeding an antenna with multiple shaped beams. One of the spacecraft is designed to be boosted by a Thor-Delta launch vehicle and raised to synchronous orbit with electric propulsion. The other two are inserted into a elliptical transfer orbit with an Atlas Centaur and injected into final orbit with an apogee kick motor. Advanced technologies employed in the several configurations include tubes with multiple stage collectors radiating directly to space, multiple-contoured beam antennas, high voltage rollout solar cell arrays with integral power conditioning, electric propulsion for orbit raising and on-station attitude control and station-keeping, and liquid metal slip rings.

  10. [Treatment of enophthalmos after severe malar-maxillary complex fracture with titanium mesh and high density polyethylene (Medpor)].

    PubMed

    Zhao, Yan-feng; Lu, Ping; Zhou, Xiao-nan; Qu, Chang-feng

    2010-03-01

    To study the surgical management of enophthalmos after severe malar maxillary complex fracture. The X-ray and CT examination were performed before operation to diagnose the orbital fracture and intraorbital tissue displacement. The fractured orbital rim was repositioned intraoperatively, followed by implantation of shaped titanium mesh to rebuild the orbital floor. The Medpor was inserted above the titanium mesh to correct the enophthalmos. From Sept. 2007 to Jan. 2009, 6 cases of enophthalmos after severe malar-maxillary complex fracture were treated. The enophthalmos was corrected or improved obviously in all the patients. The enophthalmos after severe malar-maxillary complex fracture can be corrected or obviously improved. Shaped titanium mesh can be used to rebuild the orbital floor with the Medpor to reconstruct the intraorbital tissue volume.

  11. Growing skull fracture of the posterior cranial fossa and of the orbital roof.

    PubMed

    Caffo, M; Germanò, A; Caruso, G; Meli, F; Calisto, A; Tomasello, F

    2003-03-01

    Growing Skull Fractures (GSF) are rare complications of head trauma, primarily reported in infancy and early childhood. GSF are commonly located on calvaria, and rarely in other locations, including the skull base. In this study, we report two cases of GSF occurring in unusual locations. The first, a 8-month old girl, with a GSF of the suboccipital posterior fossa region, and the second, a 4-year old boy with a GSF of the right orbital roof. Both cases underwent operative treatment of the GSF, with microsurgical dissection and excision of the protruding gliotic brain tissue, watertight duraplasty and autologous bone cranial repair. The authors conducted a Medline search of the relevant English literature from 1966 to 2002. From the search, three cases of suboccipital posterior fossa region GSF and twelve series of orbital GSF, describing a total of 22 cases, have been found. A survey of the pathogenic mechanisms underlying this entity in these locations is reported. A review of suboccipital posterior fossa and orbital roof GSF cases, of nosological, ophthalmological and neurological data, neuroradiological and operative findings, and results of different treatment strategies are described.

  12. Fluctuations in Conjunction Miss Distance Projections as Time Approaches Time of Closest Approach

    NASA Technical Reports Server (NTRS)

    Christian, John A., III

    2005-01-01

    A responsibility of the Trajectory Operations Officer is to ensure that the International Space Station (ISS) avoids colliding with debris. United States Space Command (USSPACECOM) tracks and catalogs a portion of the debris in Earth orbit, but only objects with a perigee less than 600 km and a radar cross section (RCS) greater than 10 cm-objects that, in fact, represent only a small fraction of the objects in Earth orbit. To accommodate for this, the ISS uses shielding to protect against collisions with smaller objects. This study provides a better understanding of how quickly, and to what degree, USSPACECOM projections tend to converge to the final, true miss distance. The information included is formulated to better predict the behavior of miss distance data during real-time operations. It was determined that the driving components, in order of impact on miss distance fluctuations, are energy dissipation rate (EDR), RCS, and inclination. Data used in this analysis, calculations made, and conclusions drawn are stored in Microsoft Excel log sheets. A separate log sheet, created for each conjunction, contains information such as predicted miss distances, apogee and perigee of debris orbit, EDR, RCS, inclination, tracks and observations, statistical data, and other evaluation/orbital parameters.

  13. General Dynamic (GD) Launch Waveform On-Orbit Performance Report

    NASA Technical Reports Server (NTRS)

    Briones, Janette C.; Shalkhauser, Mary Jo

    2014-01-01

    The purpose of this report is to present the results from the GD SDR on-orbit performance testing using the launch waveform over TDRSS. The tests include the evaluation of well-tested waveform modes, the operation of RF links that are expected to have high margins, the verification of forward return link operation (including full duplex), the verification of non-coherent operational models, and the verification of radio at-launch operational frequencies. This report also outlines the launch waveform tests conducted and comparisons to the results obtained from ground testing.

  14. In-Space Assembly and Construction Technology Project Summary: Infrastructure Operations Area of the Operations Technology Program

    NASA Technical Reports Server (NTRS)

    Bush, Harold

    1991-01-01

    Viewgraphs describing the in-space assembly and construction technology project of the infrastructure operations area of the operation technology program are presented. Th objective of the project is to develop and demonstrate an in-space assembly and construction capability for large and/or massive spacecraft. The in-space assembly and construction technology program will support the need to build, in orbit, the full range of spacecraft required for the missions to and from planet Earth, including: earth-orbiting platforms, lunar transfer vehicles, and Mars transfer vehicles.

  15. The BepiColombo Archive Core System (BACS)

    NASA Astrophysics Data System (ADS)

    Macfarlane, A. J.; Osuna, P.; Pérez-López, F.; Vallejo, J. C.; Martinez, S.; Arviset, C.; Casale, M.

    2015-09-01

    BepiColombo is an interdisciplinary ESA mission to explore the planet Mercury in cooperation with JAXA. The mission consists of two separate orbiters: ESA's Mercury Planetary Orbiter (MPO) and JAXA's Mercury Magnetospheric Orbiter (MMO), which are dedicated to the detailed study of the planet and its magnetosphere. The MPO scientific payload comprises 11 instruments covering different scientific disciplines developed by several European teams. The MPO science operations will be prepared by the MPO Science Ground Segment (SGS) located at the European Space Astronomy Centre (ESAC) in Madrid. The BepiColombo Archive Core System (BACS) will be the central archive in which all mission operational data will be stored and is being developed by the Science Archives and Virtual Observatory Team (SAT) also at ESAC. The BACS will act as one of the modular subsystems within the BepiColombo Science Operations Control System (BSCS), (Vallejo 2014; Pérez-López 2014) which is under the responsibility of the SGS, with the purpose of facilitating the information exchange of data and metadata between the other subsystems of the BSCS as well as with the MPO Instrument Teams. This paper gives an overview of the concept and design of the BACS and how it integrates into the science ground segment workflow.

  16. On-orbit Metrology and Calibration Requirements for Space Station Activities Definition Study

    NASA Technical Reports Server (NTRS)

    Cotty, G. M.; Ranganathan, B. N.; Sorrell, A. L.

    1989-01-01

    The Space Station is the focal point for the commercial development of space. The long term routine operation of the Space Station and the conduct of future commercial activities suggests the need for in-space metrology capabilities analogous when possible to those on-Earth. The ability to perform periodic calibrations and measurements with proper traceability is imperative for the routine operation of the Space Station. An initial review, however, indicated a paucity of data related to metrology and calibration requirements for in-space operations. This condition probably exists because of the highly developmental aspect of space activities to date, their short duration, and nonroutine nature. The on-orbit metrology and calibration needs of the Space Station were examined and assessed. In order to achieve this goal, the following tasks were performed: an up-to-date literature review; identification of on-orbit calibration techniques; identification of sensor calibration requirements; identification of calibration equipment requirements; definition of traceability requirements; preparation of technology development plans; and preparation of the final report. Significant information and major highlights pertaining to each task is presented. In addition, some general (generic) conclusions/observations and recommendations that are pertinent to the overall in-space metrology and calibration activities are presented.

  17. Ku-band signal design study. [space shuttle orbiter data processing network

    NASA Technical Reports Server (NTRS)

    Rubin, I.

    1978-01-01

    Analytical tools, methods and techniques for assessing the design and performance of the space shuttle orbiter data processing system (DPS) are provided. The computer data processing network is evaluated in the key areas of queueing behavior synchronization and network reliability. The structure of the data processing network is described as well as the system operation principles and the network configuration. The characteristics of the computer systems are indicated. System reliability measures are defined and studied. System and network invulnerability measures are computed. Communication path and network failure analysis techniques are included.

  18. Orbit Transfer Vehicle (OTV) engine phase A study

    NASA Technical Reports Server (NTRS)

    Mellish, J. A.

    1978-01-01

    Requirements for the orbit transfer vehicle engine were examined. Engine performance/weight sensitivities, the effect of a service life of 300 start/shutdown cycles between overalls on the maximum engine operating pressure, and the sensitivity of the engine design point (i.e., thrust chamber pressure and nozzle area ratio) to the performance requirements specified are among the factors studied. Preliminary engine systems analyses were conducted on the stage combustion, expander, and gas generator engine cycles. Hydrogen and oxygen pump discharge pressure requirements are shown for various engine cycles. Performance of the engine cycles is compared.

  19. Modern Microsurgical Resection of Olfactory Groove Meningiomas by Classical Bicoronal Subfrontal Approach without Orbital Osteotomies

    PubMed Central

    Farooq, Ghulam; Rehman, Lal; Bokhari, Irum; Rizvi, Syed Raza Hussain

    2018-01-01

    Background: The olfactory groove meningioma has always been surgically challenging. The common microscopic surgical procedures exercised involve modification of pterional or sub-frontal approaches with or without orbital osteotomies. However, we believe that orbital osteotomies are not mandatory to achieve gross total resection. Hence, this study was performed to evaluate the surgical outcomes of olfactory groove meningioma with bicoronal sub frontal approach but without orbital osteotomies. Materials and Methods: The study was performed by reviewing the medical charts, neuroimaging data, and follow-up data of 19 patients who were treated micro surgically for olfactory groove meningioma without orbital osteotomies in our department. Mean overall follow up period of our study was 5 years. Statistical analysis was done by means of IBM SPSS Software version 19. Results: Nineteen patients (1 male and 18 female patients, with an age range of 35-67 years; average age of patients' 51±7.5 years) of OGM were managed in our department. All patients were evaluated by MRI Brain with and without Gadolinium, CTA, CT Scan both axial and Coronal sequences. Most common symptom reported was head ache (80%), others include; urinary incontinence (26%), seizures (78%), decreased visual acuity (79%), papilledema (74%), personality changes (68%) and olfactory loss was reported in 57% of the patients. Post-operative complications include; CSF accumulation (5%), hematoma at tumor bed (10%), skin infection (5%) and mild post-operative brain edema (26%). Mortality rate was 5%. During 5 years of follow-up, we recorded one recurrence which was after 26 months and successfully removed in reoperation. Conclusion: Bi-coronal sub frontal approach appears to be an excellent technique for Olfactory Meningioma removal as practiced by most neurosurgeons. Nevertheless, it is not mandatory to carry out orbital osteotomy to acquire optimal surgical outcome as is advocated by some Authors. PMID:29682018

  20. Houston Operations Predictor/Estimator (HOPE) programming manual, volume 1. [Apollo orbit determination

    NASA Technical Reports Server (NTRS)

    Daly, J. K.

    1974-01-01

    The programming techniques used to implement the equations and mathematical techniques of the Houston Operations Predictor/Estimator (HOPE) orbit determination program on the UNIVAC 1108 computer are described. Detailed descriptions are given of the program structure, the internal program structure, the internal program tables and program COMMON, modification and maintainence techniques, and individual subroutine documentation.

  1. Nickel-cadium batteries for Apollo telescope mount

    NASA Technical Reports Server (NTRS)

    Kirsch, W. W.; Shikoh, A. E.

    1974-01-01

    The operational testing and evaluation program is presented which was conducted on 20-ampere-hour nickel-cadmium (Ni-Cd) batteries for use on the Apollo telescope mount (ATM). The test program was initiated in 1967 to determine if the batteries could meet ATM mission requirements and to determine operating characteristics and methods. The ATM system power and charging power for the Ni-Cd secondary batteries is provided by a solar array during the 58-minute daylight portion of the orbit; during the 36-minute night portion of the orbit, the Ni-Cd secondary batteries will supply ATM system power. The test results reflect battery operating characteristics and parameters relative to simulated ATM orbital test conditions. Maximum voltage, charge requirements, capacity, temperature, and cyclic characteristics are presented.

  2. Ab initio relativistic effective potentials with spin--orbit operators. III. Rb through Xe

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaJohn, L.A.; Christiansen, P.A.; Ross, R.B.

    A refined version of the ''shape consistent'' effective potential procedure of Christiansen, Lee, and Pitzer was used to compute averaged relativistic effective potentials (AREP) and spin--orbit operators for the elements Rb through Xe. Particular attention was given to the partitioning of the core and valence space and, where appropriate, more than one set of potentials is provided. These are tabulated in analytic form. Gaussian basis sets with contraction coefficients for the lowest energy state of each atom are given. The reliability of the transition metal AREPs was examined by comparing computed atomic excitation energies with accurate all-electron relativistic values. Themore » spin--orbit operators were tested in calculations on selected atoms.« less

  3. On-orbit spacecraft reliability

    NASA Technical Reports Server (NTRS)

    Bloomquist, C.; Demars, D.; Graham, W.; Henmi, P.

    1978-01-01

    Operational and historic data for 350 spacecraft from 52 U.S. space programs were analyzed for on-orbit reliability. Failure rates estimates are made for on-orbit operation of spacecraft subsystems, components, and piece parts, as well as estimates of failure probability for the same elements during launch. Confidence intervals for both parameters are also given. The results indicate that: (1) the success of spacecraft operation is only slightly affected by most reported incidents of anomalous behavior; (2) the occurrence of the majority of anomalous incidents could have been prevented piror to launch; (3) no detrimental effect of spacecraft dormancy is evident; (4) cycled components in general are not demonstrably less reliable than uncycled components; and (5) application of product assurance elements is conductive to spacecraft success.

  4. ExoMars/TGO Science Orbit Design

    NASA Technical Reports Server (NTRS)

    Long, Stacia; Lyons, Dan; Guinn, Joe; Lock, Rob

    2012-01-01

    This paper describes the development of the science orbit for the 2016 ESA/NASA collaborative ExoMars/Trace Gas Orbiter (TGO) mission. The initial requirements for the ExoMars/TGO mission simply described the science orbit as circular with a 400 km altitude and a 74 deg inclination. Over the past year, the JPL mission design team worked with the TGO science teams to refine the science orbit requirements and recommend an orbit that would be operationally feasible, easy to maintain, and most important allow the science teams to best meet their objectives.

  5. Real-Time PPP Based on the Coupling Estimation of Clock Bias and Orbit Error with Broadcast Ephemeris.

    PubMed

    Pan, Shuguo; Chen, Weirong; Jin, Xiaodong; Shi, Xiaofei; He, Fan

    2015-07-22

    Satellite orbit error and clock bias are the keys to precise point positioning (PPP). The traditional PPP algorithm requires precise satellite products based on worldwide permanent reference stations. Such an algorithm requires considerable work and hardly achieves real-time performance. However, real-time positioning service will be the dominant mode in the future. IGS is providing such an operational service (RTS) and there are also commercial systems like Trimble RTX in operation. On the basis of the regional Continuous Operational Reference System (CORS), a real-time PPP algorithm is proposed to apply the coupling estimation of clock bias and orbit error. The projection of orbit error onto the satellite-receiver range has the same effects on positioning accuracy with clock bias. Therefore, in satellite clock estimation, part of the orbit error can be absorbed by the clock bias and the effects of residual orbit error on positioning accuracy can be weakened by the evenly distributed satellite geometry. In consideration of the simple structure of pseudorange equations and the high precision of carrier-phase equations, the clock bias estimation method coupled with orbit error is also improved. Rovers obtain PPP results by receiving broadcast ephemeris and real-time satellite clock bias coupled with orbit error. By applying the proposed algorithm, the precise orbit products provided by GNSS analysis centers are rendered no longer necessary. On the basis of previous theoretical analysis, a real-time PPP system was developed. Some experiments were then designed to verify this algorithm. Experimental results show that the newly proposed approach performs better than the traditional PPP based on International GNSS Service (IGS) real-time products. The positioning accuracies of the rovers inside and outside the network are improved by 38.8% and 36.1%, respectively. The PPP convergence speeds are improved by up to 61.4% and 65.9%. The new approach can change the traditional PPP mode because of its advantages of independence, high positioning precision, and real-time performance. It could be an alternative solution for regional positioning service before global PPP service comes into operation.

  6. Real-Time PPP Based on the Coupling Estimation of Clock Bias and Orbit Error with Broadcast Ephemeris

    PubMed Central

    Pan, Shuguo; Chen, Weirong; Jin, Xiaodong; Shi, Xiaofei; He, Fan

    2015-01-01

    Satellite orbit error and clock bias are the keys to precise point positioning (PPP). The traditional PPP algorithm requires precise satellite products based on worldwide permanent reference stations. Such an algorithm requires considerable work and hardly achieves real-time performance. However, real-time positioning service will be the dominant mode in the future. IGS is providing such an operational service (RTS) and there are also commercial systems like Trimble RTX in operation. On the basis of the regional Continuous Operational Reference System (CORS), a real-time PPP algorithm is proposed to apply the coupling estimation of clock bias and orbit error. The projection of orbit error onto the satellite-receiver range has the same effects on positioning accuracy with clock bias. Therefore, in satellite clock estimation, part of the orbit error can be absorbed by the clock bias and the effects of residual orbit error on positioning accuracy can be weakened by the evenly distributed satellite geometry. In consideration of the simple structure of pseudorange equations and the high precision of carrier-phase equations, the clock bias estimation method coupled with orbit error is also improved. Rovers obtain PPP results by receiving broadcast ephemeris and real-time satellite clock bias coupled with orbit error. By applying the proposed algorithm, the precise orbit products provided by GNSS analysis centers are rendered no longer necessary. On the basis of previous theoretical analysis, a real-time PPP system was developed. Some experiments were then designed to verify this algorithm. Experimental results show that the newly proposed approach performs better than the traditional PPP based on International GNSS Service (IGS) real-time products. The positioning accuracies of the rovers inside and outside the network are improved by 38.8% and 36.1%, respectively. The PPP convergence speeds are improved by up to 61.4% and 65.9%. The new approach can change the traditional PPP mode because of its advantages of independence, high positioning precision, and real-time performance. It could be an alternative solution for regional positioning service before global PPP service comes into operation. PMID:26205276

  7. 47 CFR 25.208 - Power flux density limits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... from all co-frequency space stations of a single non-geostationary-satellite orbit (NGSO) system... geostationary satellite orbit (GSO) by the emissions from all co-frequency earth stations in a non-geostationary... single non-geostationary-satellite orbit (NGSO) system operating in the Fixed-Satellite Service (FSS...

  8. Satellite orbit computation methods

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Mathematical and algorithmical techniques for solution of problems in satellite dynamics were developed, along with solutions to satellite orbit motion. Dynamical analysis of shuttle on-orbit operations were conducted. Computer software routines for use in shuttle mission planning were developed and analyzed, while mathematical models of atmospheric density were formulated.

  9. 47 CFR 25.280 - Inclined orbit operations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... inclined orbit; and (4) Continue to maintain the space station at the authorized longitude orbital location in the geostationary satellite arc with the appropriate east-west station-keeping tolerance. [69 FR... Commission is notified by letter within 30 days after the last north-south station keeping maneuver. The...

  10. 47 CFR 25.280 - Inclined orbit operations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... inclined orbit; and (4) Continue to maintain the space station at the authorized longitude orbital location in the geostationary satellite arc with the appropriate east-west station-keeping tolerance. [69 FR... Commission is notified by letter within 30 days after the last north-south station keeping maneuver. The...

  11. 47 CFR 25.280 - Inclined orbit operations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... inclined orbit; and (4) Continue to maintain the space station at the authorized longitude orbital location in the geostationary satellite arc with the appropriate east-west station-keeping tolerance. [69 FR... Commission is notified by letter within 30 days after the last north-south station keeping maneuver. The...

  12. 47 CFR 25.280 - Inclined orbit operations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... inclined orbit; and (4) Continue to maintain the space station at the authorized longitude orbital location in the geostationary satellite arc with the appropriate east-west station-keeping tolerance. [69 FR... Commission is notified by letter within 30 days after the last north-south station keeping maneuver. The...

  13. On-orbit operations and offline data processing of CALET onboard the ISS

    NASA Astrophysics Data System (ADS)

    Asaoka, Y.; Ozawa, S.; Torii, S.; Adriani, O.; Akaike, Y.; Asano, K.; Bagliesi, M. G.; Bigongiari, G.; Binns, W. R.; Bonechi, S.; Bongi, M.; Brogi, P.; Buckley, J. H.; Cannady, N.; Castellini, G.; Checchia, C.; Cherry, M. L.; Collazuol, G.; Di Felice, V.; Ebisawa, K.; Fuke, H.; Guzik, T. G.; Hams, T.; Hareyama, M.; Hasebe, N.; Hibino, K.; Ichimura, M.; Ioka, K.; Ishizaki, W.; Israel, M. H.; Javaid, A.; Kasahara, K.; Kataoka, J.; Kataoka, R.; Katayose, Y.; Kato, C.; Kawanaka, N.; Kawakubo, Y.; Krawczynski, H. S.; Krizmanic, J. F.; Kuramata, S.; Lomtadze, T.; Maestro, P.; Marrocchesi, P. S.; Messineo, A. M.; Mitchell, J. W.; Miyake, S.; Mizutani, K.; Moiseev, A. A.; Mori, K.; Mori, M.; Mori, N.; Motz, H. M.; Munakata, K.; Murakami, H.; Nakahira, S.; Nishimura, J.; de Nolfo, G. A.; Okuno, S.; Ormes, J. F.; Pacini, L.; Palma, F.; Papini, P.; Penacchioni, A. V.; Rauch, B. F.; Ricciarini, S. B.; Sakai, K.; Sakamoto, T.; Sasaki, M.; Shimizu, Y.; Shiomi, A.; Sparvoli, R.; Spillantini, P.; Stolzi, F.; Takahashi, I.; Takayanagi, M.; Takita, M.; Tamura, T.; Tateyama, N.; Terasawa, T.; Tomida, H.; Tsunesada, Y.; Uchihori, Y.; Ueno, S.; Vannuccini, E.; Wefel, J. P.; Yamaoka, K.; Yanagita, S.; Yoshida, A.; Yoshida, K.; Yuda, T.

    2018-07-01

    The CALorimetric Electron Telescope (CALET), launched for installation on the International Space Station (ISS) in August, 2015, has been accumulating scientific data since October, 2015. CALET is intended to perform long-duration observations of high-energy cosmic rays onboard the ISS. CALET directly measures the cosmic-ray electron spectrum in the energy range of 1 GeV to 20 TeV with a 2% energy resolution above 30 GeV. In addition, the instrument can measure the spectrum of gamma rays well into the TeV range, and the spectra of protons and nuclei up to a PeV. In order to operate the CALET onboard ISS, JAXA Ground Support Equipment (JAXA-GSE) and the Waseda CALET Operations Center (WCOC) have been established at JAXA and Waseda University, respectively. Scientific operations using CALET are planned at WCOC, taking into account orbital variations of geomagnetic rigidity cutoff. Scheduled command sequences are used to control the CALET observation modes on orbit. Calibration data acquisition by, for example, recording pedestal and penetrating particle events, a low-energy electron trigger mode operating at high geomagnetic latitude, a low-energy gamma-ray trigger mode operating at low geomagnetic latitude, and an ultra heavy trigger mode, are scheduled around the ISS orbit while maintaining maximum exposure to high-energy electrons and other high-energy shower events by always having the high-energy trigger mode active. The WCOC also prepares and distributes CALET flight data to collaborators in Italy and the United States. As of August 31, 2017, the total observation time is 689 days with a live time fraction of the total time of ∼ 84%. Nearly 450 million events are collected with a high-energy (E > 10 GeV) trigger. In addition, calibration data acquisition and low-energy trigger modes, as well as an ultra-heavy trigger mode, are consistently scheduled around the ISS orbit. By combining all operation modes with the excellent-quality on-orbit data collected thus far, it is expected that a five-year observation period will provide a wealth of new and interesting results.

  14. The End-To-End Safety Verification Process Implemented to Ensure Safe Operations of the Columbus Research Module

    NASA Astrophysics Data System (ADS)

    Arndt, J.; Kreimer, J.

    2010-09-01

    The European Space Laboratory COLUMBUS was launched in February 2008 with NASA Space Shuttle Atlantis. Since successful docking and activation this manned laboratory forms part of the International Space Station(ISS). Depending on the objectives of the Mission Increments the on-orbit configuration of the COLUMBUS Module varies with each increment. This paper describes the end-to-end verification which has been implemented to ensure safe operations under the condition of a changing on-orbit configuration. That verification process has to cover not only the configuration changes as foreseen by the Mission Increment planning but also those configuration changes on short notice which become necessary due to near real-time requests initiated by crew or Flight Control, and changes - most challenging since unpredictable - due to on-orbit anomalies. Subject of the safety verification is on one hand the on orbit configuration itself including the hardware and software products, on the other hand the related Ground facilities needed for commanding of and communication to the on-orbit System. But also the operational products, e.g. the procedures prepared for crew and ground control in accordance to increment planning, are subject of the overall safety verification. In order to analyse the on-orbit configuration for potential hazards and to verify the implementation of the related Safety required hazard controls, a hierarchical approach is applied. The key element of the analytical safety integration of the whole COLUMBUS Payload Complement including hardware owned by International Partners is the Integrated Experiment Hazard Assessment(IEHA). The IEHA especially identifies those hazardous scenarios which could potentially arise through physical and operational interaction of experiments. A major challenge is the implementation of a Safety process which owns quite some rigidity in order to provide reliable verification of on-board Safety and which likewise provides enough flexibility which is desired by manned space operations with scientific objectives. In the period of COLUMBUS operations since launch already a number of lessons learnt could be implemented especially in the IEHA that allow to improve the flexibility of on-board operations without degradation of Safety.

  15. Management of the orbital environment

    NASA Technical Reports Server (NTRS)

    Loftus, Joseph P., Jr.; Kessler, Donald J.; Anz-Meador, Phillip D.

    1991-01-01

    Data regarding orbital debris are presented to shed light on the requirements of environmental management in space, and strategies are given for active intervention and operational strategies. Debris are generated by inadvertent explosions of upper stages, intentional military explosions, and collisional breakups. Design and operation practices are set forth for minimizing debris generation and removing useless debris from orbit in the low-earth and geosynchronous orbits. Self-disposal options include propulsive maneuvers, drag-augmentation devices, and tether systems, and the drag devices are described as simple and passive. Active retrieval and disposition are considered, and the difficulty is examined of removing small debris. Active intervention techniques are required since pollution prevention is more effective than remediation for the problems of both earth and space.

  16. Sub-orbital commercial Human space flight and informed consent in the United States

    NASA Astrophysics Data System (ADS)

    Carminati, Maria-Vittoria « Giugi »; Griffith, Doug; Campbell, Mark R.

    2013-12-01

    Commercial space flight is expected to rapidly develop in the near future. This will begin with sub-orbital missions and then progress to orbital flights. In the United States, technical informed consent of space flight participants is required by the commercial space flight operator for regulatory purposes. Additionally, though not required by U.S. regulation, the aerospace medicine professional involved in the medical screening of both space flight participants and crewmembers will be asked to assist operators in obtaining medical informed consent for liability purposes. The various US federal and state regulations regarding informed consent for sub-orbital commercial space flight are evolving and are unfamiliar to most aerospace medical professionals and are reviewed and discussed.

  17. Hypersonic vehicle control law development using H(infinity) and micron-synthesis

    NASA Technical Reports Server (NTRS)

    Gregory, Irene M.; Mcminn, John D.; Shaughnessy, John D.; Chowdhry, Rajiv S.

    1993-01-01

    Hypersonic vehicle control law development using H(infinity) and mu-synthesis is discussed. Airbreathing SSTO vehicles has a mutli-faceted mission that includes orbital operations, as well as re-entry and descent culminating in horizontal landing. However, the most challenging part of the operations is the ascent to orbit. The airbreathing propulsion requires lengthy atmospheric flight that may last as long as 30 minutes and take the vehicle half way around the globe. The vehicles's ascent is characterized by tight payload to orbit margins which translate into minimum fuel orbit as the performance criteria. Issues discussed include: SSTO airbreathing vehicle issues; control system performance requirements; robust control law framework; H(infinity) controller frequency analysis; and mu controller frequency analysis.

  18. Landsat Data Continuity Mission (LDCM) Flight Dynamics System (FDS)

    NASA Technical Reports Server (NTRS)

    Good, Susan M.; Nicholson, Ann M.

    2012-01-01

    The Landsat Data Continuity Mission (LDCM) will be launched in January 2013 to continue the legacy of Landsat land imagery collection that has been on-going for the past 40 years. While the overall mission and science goals are designed to produce the SAME data over the years, the ground systems designed to support the mission objectives have evolved immensely. The LDCM Flight Dynamics System (FDS) currently being tested and deployed for operations is highly automated and well integrated with the other ground system elements. The FDS encompasses the full suite of flight dynamics functional areas, including orbit and attitude determination and prediction, orbit and attitude maneuver planning and execution, and planning product generation. The integration of the orbit, attitude, maneuver, and products functions allows a very smooth flow for daily operations support with minimal input needed from the operator. The system also provides a valuable real-time component that monitors the on-board orbit and attitude during every ground contact and will autonomously alert the Flight Operations Team (FOT) personnel when any violations are found. This paper provides an overview of the LDCM Flight Dynamics System and a detailed description of how it is used to support space operations. For the first time on a Goddard Space Flight Center (GSFC)-managed mission, the ground attitude and orbits systems are fully integrated into a cohesive package. The executive engine of the FDS permits three levels of automation: low, medium, and high. The high-level, which will be the standard mode for LDCM, represents nearly lights-out operations. The paper provides an in-depth look at these processes within the FDS in support of LDCM in all mission phases.

  19. The microgravity environment of the Space Shuttle Columbia payload bay during STS-32

    NASA Technical Reports Server (NTRS)

    Dunbar, Bonnie J.; Giesecke, Robert L.; Thomas, Donald A.

    1991-01-01

    Over 11 hours of three-axis microgravity accelerometer data were successfully measured in the payload bay of Space Shuttle Columbia as part of the Microgravity Disturbances Experiment on STS-32. These data were measured using the High Resolution Accelerometer Package and the Aerodynamic Coefficient Identification Package which were mounted on the Orbiter keel in the aft payload bay. Data were recorded during specific mission events such as Orbiter quiescent periods, crew exercise on the treadmill, and numerous Orbiter engine burns. Orbiter background levels were measured in the 10(exp -5) G range, treadmill operations in the 10(exp -3) G range, and the Orbiter engine burns in the 10(exp -2) G range. Induced acceleration levels resulting from the SYNCOM satellite deploy were in the 10 (exp -2) G range, and operations during the pre-entry Flight Control System checkout were in the 10(exp -2) to 10(exp -1) G range.

  20. Space tug economic analysis study. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1972-01-01

    An economic analysis of space tug operations is presented. The space tug is defined as any liquid propulsion stage under 100,000 pounds propellant loading that is flown from the space shuttle cargo bay. Two classes of vehicles are the orbit injection stages and reusable space tugs. The vehicle configurations, propellant combinations, and operating modes used for the study are reported. The summary contains data on the study approach, results, conclusions, and recommendations.

Top