30 CFR 77.1801 - Overcurrent protection.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Overcurrent protection. 77.1801 Section 77.1801... Wires and Trolley Feeder Wires § 77.1801 Overcurrent protection. Trolley wires and trolley feeder wires shall be provided with overcurrent protection. ...
33 CFR 159.75 - Overcurrent protection.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Overcurrent protection. 159.75...) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.75 Overcurrent protection. Overcurrent protection must be provided within the unit to protect subcomponents of the device if the...
46 CFR 111.40-15 - Overcurrent device.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Overcurrent device. 111.40-15 Section 111.40-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-15 Overcurrent device. The total load on any overcurrent device located in a...
46 CFR 111.40-15 - Overcurrent device.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Overcurrent device. 111.40-15 Section 111.40-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-15 Overcurrent device. The total load on any overcurrent device located in a...
46 CFR 111.40-15 - Overcurrent device.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Overcurrent device. 111.40-15 Section 111.40-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-15 Overcurrent device. The total load on any overcurrent device located in a...
46 CFR 111.40-15 - Overcurrent device.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Overcurrent device. 111.40-15 Section 111.40-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-15 Overcurrent device. The total load on any overcurrent device located in a...
46 CFR 111.40-15 - Overcurrent device.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Overcurrent device. 111.40-15 Section 111.40-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Panelboards § 111.40-15 Overcurrent device. The total load on any overcurrent device located in a...
Transient analysis for alternating over-current characteristics of HTSC power transmission cable
NASA Astrophysics Data System (ADS)
Lim, S. H.; Hwang, S. D.
2006-10-01
In this paper, the transient analysis for the alternating over-current distribution in case that the over-current was applied for a high-TC superconducting (HTSC) power transmission cable was performed. The transient analysis for the alternating over-current characteristics of HTSC power transmission cable with multi-layer is required to estimate the redistribution of the over-current between its conducting layers and to protect the cable system from the over-current in case that the quench in one or two layers of the HTSC power cable happens. For its transient analysis, the resistance generation of the conducting layers for the alternating over-current was reflected on its equivalent circuit, based on the resistance equation obtained by applying discrete Fourier transform (DFT) for the voltage and the current waveforms of the HTSC tape, which comprises each layer of the HTSC power transmission cable. It was confirmed through the numerical analysis on its equivalent circuit that after the current redistribution from the outermost layer into the inner layers first happened, the fast current redistribution between the inner layers developed as the amplitude of the alternating over-current increased.
46 CFR 111.05-37 - Overcurrent devices.
Code of Federal Regulations, 2011 CFR
2011-10-01
... devices. (a) A permanently grounded conductor must not have an overcurrent device unless the overcurrent device simultaneously opens each ungrounded conductor of the circuit. (b) The neutral conductor of the...
46 CFR 111.05-37 - Overcurrent devices.
Code of Federal Regulations, 2010 CFR
2010-10-01
... devices. (a) A permanently grounded conductor must not have an overcurrent device unless the overcurrent device simultaneously opens each ungrounded conductor of the circuit. (b) The neutral conductor of the...
33 CFR 159.75 - Overcurrent protection.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Overcurrent protection. 159.75 Section 159.75 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.75 Overcurrent protection...
46 CFR 111.97-9 - Overcurrent protection.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-9 Overcurrent protection. Overcurrent devices must be arranged to isolate a fault with as little disruption of the system as possible...
46 CFR 111.97-9 - Overcurrent protection.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Overcurrent protection. 111.97-9 Section 111.97-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-9 Overcurrent protection...
46 CFR 111.97-9 - Overcurrent protection.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Overcurrent protection. 111.97-9 Section 111.97-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-9 Overcurrent protection...
46 CFR 111.97-9 - Overcurrent protection.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Overcurrent protection. 111.97-9 Section 111.97-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-9 Overcurrent protection...
46 CFR 111.97-9 - Overcurrent protection.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Overcurrent protection. 111.97-9 Section 111.97-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Watertight Door Systems § 111.97-9 Overcurrent protection...
46 CFR 111.20-15 - Protection of transformers against overcurrent.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Protection of transformers against overcurrent. 111.20... ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Transformer Construction, Installation, and Protection § 111.20-15 Protection of transformers against overcurrent. Each transformer must have protection against...
46 CFR 111.20-15 - Protection of transformers against overcurrent.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Protection of transformers against overcurrent. 111.20... ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Transformer Construction, Installation, and Protection § 111.20-15 Protection of transformers against overcurrent. Each transformer must have protection against...
46 CFR 111.20-15 - Protection of transformers against overcurrent.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Protection of transformers against overcurrent. 111.20... ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Transformer Construction, Installation, and Protection § 111.20-15 Protection of transformers against overcurrent. Each transformer must have protection against...
46 CFR 111.20-15 - Protection of transformers against overcurrent.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Protection of transformers against overcurrent. 111.20... ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Transformer Construction, Installation, and Protection § 111.20-15 Protection of transformers against overcurrent. Each transformer must have protection against...
46 CFR 111.20-15 - Protection of transformers against overcurrent.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Protection of transformers against overcurrent. 111.20... ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Transformer Construction, Installation, and Protection § 111.20-15 Protection of transformers against overcurrent. Each transformer must have protection against...
46 CFR 28.365 - Overcurrent protection and switched circuits.
Code of Federal Regulations, 2010 CFR
2010-10-01
... a steering circuit, each circuit must be protected against both overload and short circuit. Each overcurrent device in a steering system power and control circuit must provide short circuit protection only... 46 Shipping 1 2010-10-01 2010-10-01 false Overcurrent protection and switched circuits. 28.365...
46 CFR 111.77-1 - Overcurrent protection.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-GENERAL REQUIREMENTS Appliances and Appliance Circuits § 111.77-1 Overcurrent protection. If a circuit supplies only one appliance or device, the rating or setting of the branch circuit overcurrent device must not be more than 150 percent of the rating of the appliance or device, or 15 amperes, whichever is...
Verification of an IGBT Fusing Switch for Over-current Protection of the SNS HVCM
DOE Office of Scientific and Technical Information (OSTI.GOV)
Benwell, Andrew; Kemp, Mark; Burkhart, Craig
2010-06-11
An IGBT based over-current protection system has been developed to detect faults and limit the damage caused by faults in high voltage converter modulators. During normal operation, an IGBT enables energy to be transferred from storage capacitors to a H-bridge. When a fault occurs, the over-current protection system detects the fault, limits the fault current and opens the IGBT to isolate the remaining stored energy from the fault. This paper presents an experimental verification of the over-current protection system under applicable conditions.
46 CFR 58.25-55 - Overcurrent protection for steering-gear systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... overcurrent protection except short-circuit protection that is instantaneous and rated at 400% to 500% of— (1... for steering-gear systems. (a) Each feeder circuit for steering must be protected by a circuit breaker... motor for an alternating-current motor. (b) No feeder circuit for steering may have any overcurrent...
46 CFR 113.25-7 - Power supply overcurrent protection.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Power supply overcurrent protection. 113.25-7 Section... COMMUNICATION AND ALARM SYSTEMS AND EQUIPMENT General Emergency Alarm Systems § 113.25-7 Power supply overcurrent protection. (a) If the general emergency alarm system is the only load supplied by the general...
46 CFR 113.25-7 - Power supply overcurrent protection.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Power supply overcurrent protection. 113.25-7 Section... COMMUNICATION AND ALARM SYSTEMS AND EQUIPMENT General Emergency Alarm Systems § 113.25-7 Power supply overcurrent protection. (a) If the general emergency alarm system is the only load supplied by the general...
NASA Astrophysics Data System (ADS)
Wei, LIU; Chundong, HU; Sheng, LIU; Shihua, SONG; Jinxin, WANG; Yan, WANG; Yuanzhe, ZHAO; Lizhen, LIANG
2017-12-01
Neutral beam injection is one of the effective auxiliary heating methods in magnetic-confinement-fusion experiments. In order to acquire the suppressor-grid current signal and avoid the grid being damaged by overheating, a data acquisition and over-current protection system based on the PXI (PCI eXtensions for Instrumentation) platform has been developed. The system consists of a current sensor, data acquisition module and over-current protection module. In the data acquisition module, the acquired data of one shot will be transferred in isolation and saved in a data-storage server in a txt file. It can also be recalled using NBWave for future analysis. The over-current protection module contains two modes: remote and local. This gives it the function of setting a threshold voltage remotely and locally, and the forbidden time of over-current protection also can be set by a host PC in remote mode. Experimental results demonstrate that the data acquisition and over-current protection system has the advantages of setting forbidden time and isolation transmission.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Devices for overcurrent protection; testing and... Trolley Wires and Trolley Feeder Wires § 75.1001-1 Devices for overcurrent protection; testing and.... Calibration of such devices shall include adjustment of all associated relays to ±15 percent of the indicated...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Devices for overcurrent protection; testing and... Trolley Wires and Trolley Feeder Wires § 75.1001-1 Devices for overcurrent protection; testing and.... Calibration of such devices shall include adjustment of all associated relays to ±15 percent of the indicated...
30 CFR 75.1001 - Overcurrent protection.
Code of Federal Regulations, 2011 CFR
2011-07-01
... MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Trolley Wires and Trolley Feeder Wires § 75.1001 Overcurrent protection. [Statutory Provisions] Trolley wires and trolley feeder wires shall be provided with...
30 CFR 75.1001 - Overcurrent protection.
Code of Federal Regulations, 2010 CFR
2010-07-01
... MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Trolley Wires and Trolley Feeder Wires § 75.1001 Overcurrent protection. [Statutory Provisions] Trolley wires and trolley feeder wires shall be provided with...
NASA Astrophysics Data System (ADS)
Ilik, Semih C.; Arsoy, Aysen B.
2017-07-01
Integration of distributed generation (DG) such as renewable energy sources to electrical network becomes more prevalent in recent years. Grid connection of DG has effects on load flow directions, voltage profile, short circuit power and especially protection selectivity. Applying traditional overcurrent protection scheme is inconvenient when system reliability and sustainability are considered. If a fault happens in DG connected network, short circuit contribution of DG, creates additional branch element feeding the fault current; compels to consider directional overcurrent (OC) protection scheme. Protection coordination might get lost for changing working conditions when DG sources are connected. Directional overcurrent relay parameters are determined for downstream and upstream relays when different combinations of DG connected singular or plural, on radial test system. With the help of proposed flow chart, relay parameters are updated and coordination between relays kept sustained for different working conditions in DigSILENT PowerFactory program.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Enclosures. 111.50-7 Section 111.50-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-7 Enclosures. (a) Each enclosure of an overcurrent protective...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Enclosures. 111.50-7 Section 111.50-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-7 Enclosures. (a) Each enclosure of an overcurrent protective...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Enclosures. 111.50-7 Section 111.50-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-7 Enclosures. (a) Each enclosure of an overcurrent protective...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Enclosures. 111.50-7 Section 111.50-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-7 Enclosures. (a) Each enclosure of an overcurrent protective...
NASA Astrophysics Data System (ADS)
Tallouli, M.; Shyshkin, O.; Yamaguchi, S.
2017-07-01
The development of power transmission lines based on long-length high temperature superconducting (HTS) tapes is complicated and technically challenging task. A serious problem for transmission line operation could become HTS power cable damage due to over-current pulse conditions. To avoid the cable damage in any urgent case the superconducting coil technology, i.e. superconductor fault current limiter (SFCL) is required. Comprehensive understanding of the current density characteristics of HTS tapes in both cases, either after pure over-current pulse or after over-current pulse limited by SFCL, is needed to restart or to continue the operation of the power transmission line. Moreover, current density distribution along and across the HTS tape provides us with the sufficient information about the quality of the tape performance in different current feeding regimes. In present paper we examine BSCCO HTS tape under two current feeding regimes. The first one is 100A feeding preceded by 900A over-current pulse. In this case none of tape protection was used. The second scenario is similar to the fist one but SFCL is used to limit an over-current value. For both scenarios after the pulse is gone and the current feeding is set up at 100A we scan magnetic field above the tape by means of Hall probe sensor. Then the feeding is turned of and the magnetic field scanning is repeated. Using the inverse problem numerical solver we calculate the corresponding direct and permanent current density distributions during the feeding and after switch off. It is demonstrated that in the absence of SFCL the current distribution is highly peaked at the tape center. At the same time the current distribution in the experiment with SFCL is similar to that observed under normal current feeding condition. The current peaking in the first case is explained by the effect of an opposite electric field induced at the tape edges during the overcurrent pulse decay, and by degradation of superconductivity at the edges due to penetration of magnetic field in superconducting core during the pulse.
46 CFR 169.683 - Overcurrent protection, general.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Overcurrent protection, general. 169.683 Section 169.683 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS... reaches a value that causes an excessive or dangerous temperature in the conductor or conductor insulation...
Over-current carrying characteristics of rectangular-shaped YBCO thin films prepared by MOD method
NASA Astrophysics Data System (ADS)
Hotta, N.; Yokomizu, Y.; Iioka, D.; Matsumura, T.; Kumagai, T.; Yamasaki, H.; Shibuya, M.; Nitta, T.
2008-02-01
A fault current limiter (FCL) may be manufactured at competitive qualities and prices by using rectangular-shaped YBCO films which are prepared by metal-organic deposition (MOD) method, because the MOD method can produce large size elements with a low-cost and non-vacuum technique. Prior to constructing a superconducting FCL (SFCL), AC over-current carrying experiments were conducted for 120 mm long elements where YBCO thin film of about 200 nm in thickness was coated on sapphire substrate with cerium oxide (CeO2) interlayer. In the experiments, only single cycle of the ac damping current of 50 Hz was applied to the pure YBCO element without protective metal coating or parallel resistor and the magnitude of the current was increased step by step until the breakdown phenomena occurred in the element. In each experiment, current waveforms flowing through the YBCO element and voltage waveform across the element were measured to get the voltage-current characteristics. The allowable over-current and generated voltage were successfully estimated for the pure YBCO films. It can be pointed out that the lower n-value trends to bring about the higher allowable over-current and the higher withstand voltage more than tens of volts. The YBCO film having higher n-value is sensitive to the over-current. Thus, some protective methods such as a metal coating should be employed for applying to the fault current limiter.
33 CFR 183.460 - Overcurrent protection: Special applications.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Requirements § 183.460 Overcurrent protection: Special applications. (a) Each ungrounded output conductor from... conductor is in the main power feed circuit from the battery to an engine cranking motor. The circuit breaker or fuse must be within 72 inches of the battery measured along the conductor, unless, for boats...
33 CFR 183.455 - Overcurrent protection: General.
Code of Federal Regulations, 2011 CFR
2011-07-01
....455 Overcurrent protection: General. (a) Each ungrounded current-carrying conductor must be protected... breaker or fuse must be placed at the source of power for each circuit or conductor except: (1) If it is... seven inches of the source of power for each circuit or conductor measured along the conductor. (2) If...
46 CFR 183.380 - Overcurrent protection.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) Overcurrent protection must be provided for each ungrounded conductor for the purpose of opening the electric circuit if the current reaches a value that causes an excessive or dangerous temperature in the conductor or conductor insulation. (b) The grounded conductor of a circuit must not be disconnected by a switch...
46 CFR 183.380 - Overcurrent protection.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) Overcurrent protection must be provided for each ungrounded conductor for the purpose of opening the electric circuit if the current reaches a value that causes an excessive or dangerous temperature in the conductor or conductor insulation. (b) The grounded conductor of a circuit must not be disconnected by a switch...
33 CFR 183.460 - Overcurrent protection: Special applications.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Requirements § 183.460 Overcurrent protection: Special applications. (a) Each ungrounded output conductor from... conductor is in the main power feed circuit from the battery to an engine cranking motor. The circuit breaker or fuse must be within 72 inches of the battery measured along the conductor, unless, for boats...
33 CFR 183.455 - Overcurrent protection: General.
Code of Federal Regulations, 2010 CFR
2010-07-01
....455 Overcurrent protection: General. (a) Each ungrounded current-carrying conductor must be protected... breaker or fuse must be placed at the source of power for each circuit or conductor except: (1) If it is... seven inches of the source of power for each circuit or conductor measured along the conductor. (2) If...
46 CFR 111.50-3 - Protection of conductors.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Protection of conductors. 111.50-3 Section 111.50-3...-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-3 Protection of conductors. (a) Purpose. The purpose of overcurrent protection for conductors is to open the electric circuit if the current reaches a...
46 CFR 111.50-3 - Protection of conductors.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Protection of conductors. 111.50-3 Section 111.50-3...-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-3 Protection of conductors. (a) Purpose. The purpose of overcurrent protection for conductors is to open the electric circuit if the current reaches a...
46 CFR 58.25-55 - Overcurrent protection for steering-gear systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Steering Gear § 58.25-55 Overcurrent protection... machinery-control station if there is an overload that would cause overheating of the motor. (d) No control... operated by power, is not operated by electric power or is operated by an electric motor primarily intended...
46 CFR 58.25-55 - Overcurrent protection for steering-gear systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Steering Gear § 58.25-55 Overcurrent protection... machinery-control station if there is an overload that would cause overheating of the motor. (d) No control... operated by power, is not operated by electric power or is operated by an electric motor primarily intended...
Saturating time-delay transformer for overcurrent protection. [Patent application
Praeg, W.F.
1975-12-18
Electrical loads connected to dc supplies are protected from damage by overcurrent in the case of a load fault by connecting in series with the load a saturating transformer that detects a load fault and limits the fault current to a safe level for a period long enough to correct the fault or else disconnect the power supply.
46 CFR 169.684 - Overcurrent protection for motors and motor branch circuits.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Overcurrent protection for motors and motor branch... motors and motor branch circuits. (a) Except as provided in paragraph (d) of this section, each motor... motor that is responsive to motor current or to both motor current and temperature may be used. (b) The...
Saturating time-delay transformer for overcurrent protection
Praeg, Walter F.
1977-01-01
Electrical loads connected to d-c supplies are protected from damage by overcurrent in the case of a load fault by connecting in series with the load a saturating transformer that detects a load fault and limits the fault current to a safe level for a period long enough to correct the fault or else disconnect the power supply.
NASA Astrophysics Data System (ADS)
Budzisz, Joanna; Wróblewski, Zbigniew
2016-03-01
The article presents a method of modelling a vaccum circuit breaker in the ATP/EMTP package, the results of the verification of the correctness of the developed digital circuit breaker model operation and its practical usefulness for analysis of overvoltages and overcurrents occurring in commutated capacitive electrical circuits and also examples of digital simulations of overvoltages and overcurrents in selected electrical circuits.
NASA Technical Reports Server (NTRS)
Aucoin, B. M.; Heller, R. P.
1990-01-01
An intelligent remote power controller (RPC) based on microcomputer technology can implement advanced functions for the accurate and secure detection of all types of faults on a spaceborne electrical distribution system. The intelligent RPC will implement conventional protection functions such as overcurrent, under-voltage, and ground fault protection. Advanced functions for the detection of soft faults, which cannot presently be detected, can also be implemented. Adaptive overcurrent protection changes overcurrent settings based on connected load. Incipient and high-impedance fault detection provides early detection of arcing conditions to prevent fires, and to clear and reconfigure circuits before soft faults progress to a hard-fault condition. Power electronics techniques can be used to implement fault current limiting to prevent voltage dips during hard faults. It is concluded that these techniques will enhance the overall safety and reliability of the distribution system.
Superconducting technology for overcurrent limiting in a 25 kA current injection system
NASA Astrophysics Data System (ADS)
Heydari, Hossein; Faghihi, Faramarz; Sharifi, Reza; Poursoltanmohammadi, Amir Hossein
2008-09-01
Current injection transformer (CIT) systems are within the major group of the standard type test of high current equipment in the electrical industry, so their performance becomes very important. When designing high current systems, there are many factors to be considered from which their overcurrent protection must be ensured. The output of a CIT is wholly dependent on the impedance of the equipment under test (EUT). Therefore current flow beyond the allowable limit can occur. The present state of the art provides an important guide to developing current limiters not only for the grid application but also in industrial equipment. This paper reports the state of the art in the technology available that could be developed into an application of superconductivity for high current equipment (CIT) protection with no test disruption. This will result in a greater market choice and lower costs for equipment protection solutions, reduced costs and improved system reliability. The paper will also push the state of the art by using two distinctive circuits, closed-core and open-core, for overcurrent protection of a 25 kA CIT system, based on a flux-lock-type superconducting fault current limiter (SFCL) and magnetic properties of high temperature superconducting (HTS) elements. An appropriate location of the HTS element will enhance the rate of limitation with the help of the magnetic field generated by the CIT output busbars. The calculation of the HTS parameters for overcurrent limiting is also performed to suit the required current levels of the CIT.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jiang, Y.; Ekstroem, A.
1997-01-01
This study is devoted to investigating the possibility of controlling the overcurrent of a forced-commutated voltage source converter (VSC) by PWM when the ac system is undergoing large unbalanced disturbance. The converter is supposed to be used as a static var compensator at a high power level. A novel control strategy is proposed for controlling the reactive current and the dc side voltage independently. Digital simulation results are presented and compared with the results by using just the reactive current control with fundamental switching frequency.
Electrical short circuit and current overload tests on aircraft wiring
NASA Technical Reports Server (NTRS)
Cahill, Patricia
1995-01-01
The findings of electrical short circuit and current overload tests performed on commercial aircraft wiring are presented. A series of bench-scale tests were conducted to evaluate circuit breaker response to overcurrent and to determine if the wire showed any visible signs of thermal degradation due to overcurrent. Three types of wire used in commercial aircraft were evaluated: MIL-W-22759/34 (150 C rated), MIL-W-81381/12 (200 C rated), and BMS 1360 (260 C rated). A second series of tests evaluated circuit breaker response to short circuits and ticking faults. These tests were also meant to determine if the three test wires behaved differently under these conditions and if a short circuit or ticking fault could start a fire. It is concluded that circuit breakers provided reliable overcurrent protection. Circuit breakers may not protect wire from ticking faults but can protect wire from direct shorts. These tests indicated that the appearance of a wire subjected to a current that totally degrades the insulation looks identical to a wire subjected to a fire; however the 'fire exposed' conductor was more brittle than the conductor degraded by overcurrent. Preliminary testing indicates that direct short circuits are not likely to start a fire. Preliminary testing indicated that direct short circuits do not erode insulation and conductor to the extent that ticking faults did. Circuit breakers may not safeguard against the ignition of flammable materials by ticking faults. The flammability of materials near ticking faults is far more important than the rating of the wire insulation material.
High energy overcurrent protective device
Praeg, Walter F.
1982-01-01
Electrical loads connected to capacitance elements in high voltage direct current systems are protected from damage by capacitance discharge overcurrents by connecting between the capacitance element and the load, a longitudinal inductor comprising a bifilar winding wound about a magnetic core, which forms an incomplete magnetic circuit. A diode is connected across a portion of the bifilar winding which conducts a unidirectional current only. Energy discharged from the capacitance element is stored in the inductor and then dissipated in an L-R circuit including the diode and the coil winding. Multiple high voltage circuits having capacitance elements may be connected to loads through bifilar windings all wound about the aforementioned magnetic core.
46 CFR 183.392 - Radiotelephone installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided...
46 CFR 183.392 - Radiotelephone installations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided...
46 CFR 183.392 - Radiotelephone installations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided...
Code of Federal Regulations, 2010 CFR
2010-10-01
... continuity of service for equipment vital to the propulsion, control or safety of the vessel under short-circuit conditions through coordination and selective operation of overcurrent protective devices. ...
Testing of a 1.25-m HTS Cable Made from YBCO Tapes
NASA Astrophysics Data System (ADS)
Gouge, M. J.; Lue, J. W.; Demko, J. A.; Duckworth, R. C.; Fisher, P. W.; Daumling, M.; Lindsay, D. T.; Roden, M. L.; Tolbert, J. C.
2004-06-01
Ultera and Oak Ridge National Laboratory (ORNL) have jointly designed, built, and tested a 1.25-m-long, prototype high-temperature superconducting (HTS) power cable made from 1-cm-wide, second-generation YBa2Cu3Ox (YBCO)-coated conductor tapes. Electrical tests of this cable were performed in boiling liquid nitrogen at 77 K. DC testing of the 1.25-m cable included determination of the V-I curve, with a critical current of 4200 A. This was consistent with the properties of the 24 individual YBCO tapes. AC testing of the cable was conducted at currents up to 2500 Arms. The ac losses were measured calorimetrically by measuring the response of a calibrated temperature sensor placed on the former and electrically by use of a Rogowski coil with a lock-in amplifier. AC losses of about 2 W/m were measured at a cable ac current of 2000 Arms. Overcurrent testing was conducted at peak current values up to 12 kA for pulse lengths of 0.1-0.2 s. The cable temperature increased to 105 K for a 12 kA, 0.2 s overcurrent pulse, and the cable showed no degradation after the sequence of overcurrent testing. This commercial-grade HTS cable demonstrated the feasibility of second-generation YBCO tapes in an ac cable application.
46 CFR 169.683 - Overcurrent protection, general.
Code of Federal Regulations, 2013 CFR
2013-10-01
... time delay; (2) Instantaneous short circuit protection; and (3) Repeated opening of the circuit in... above the full-load rating for continuous rated machines or the overload rating for special rated machines. ...
46 CFR 169.683 - Overcurrent protection, general.
Code of Federal Regulations, 2014 CFR
2014-10-01
... time delay; (2) Instantaneous short circuit protection; and (3) Repeated opening of the circuit in... above the full-load rating for continuous rated machines or the overload rating for special rated machines. ...
46 CFR 169.683 - Overcurrent protection, general.
Code of Federal Regulations, 2012 CFR
2012-10-01
... time delay; (2) Instantaneous short circuit protection; and (3) Repeated opening of the circuit in... above the full-load rating for continuous rated machines or the overload rating for special rated machines. ...
46 CFR 28.365 - Overcurrent protection and switched circuits.
Code of Federal Regulations, 2011 CFR
2011-10-01
.... (c) Each ungrounded current carrying conductor must be protected in accordance with its current carrying capacity by a circuit breaker or fuse at the connection to the switchboard or distribution panel...
46 CFR 169.682 - Distribution and circuit loads.
Code of Federal Regulations, 2010 CFR
2010-10-01
... the rating of the overcurrent protective device, computed using the greater of— (1) The lamp sizes to be installed; or (2) 50 watts per outlet. (b) Circuits supplying electrical discharge lamps must be...
46 CFR 28.860 - Overcurrent protection and switched circuits.
Code of Federal Regulations, 2010 CFR
2010-10-01
... current carrying conductor must be protected in accordance with its current carrying capacity by a circuit breaker or fuse at the connection to the switchboard or distribution panel bus. (d) Each circuit breaker...
46 CFR 28.860 - Overcurrent protection and switched circuits.
Code of Federal Regulations, 2011 CFR
2011-10-01
... current carrying conductor must be protected in accordance with its current carrying capacity by a circuit breaker or fuse at the connection to the switchboard or distribution panel bus. (d) Each circuit breaker...
77 FR 41937 - Airworthiness Directives; Cessna Aircraft Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-17
... in the current supplied by the cabin altitude logic module. The over-current module senses the spike... for this proposed AD, we considered the degree of urgency associated with the subject unsafe condition...
46 CFR 111.50-5 - Location of overcurrent protective devices.
Code of Federal Regulations, 2014 CFR
2014-10-01
... primary side of a single phase transformer (two wire with single-voltage secondary) also protects the... secondary conductor by the secondary to primary transformer voltage ratio, and this protection meets § 111...
46 CFR 111.50-5 - Location of overcurrent protective devices.
Code of Federal Regulations, 2011 CFR
2011-10-01
... primary side of a single phase transformer (two wire with single-voltage secondary) also protects the... secondary conductor by the secondary to primary transformer voltage ratio, and this protection meets § 111...
46 CFR 111.50-5 - Location of overcurrent protective devices.
Code of Federal Regulations, 2010 CFR
2010-10-01
... primary side of a single phase transformer (two wire with single-voltage secondary) also protects the... secondary conductor by the secondary to primary transformer voltage ratio, and this protection meets § 111...
46 CFR 111.50-5 - Location of overcurrent protective devices.
Code of Federal Regulations, 2013 CFR
2013-10-01
... primary side of a single phase transformer (two wire with single-voltage secondary) also protects the... secondary conductor by the secondary to primary transformer voltage ratio, and this protection meets § 111...
46 CFR 111.50-5 - Location of overcurrent protective devices.
Code of Federal Regulations, 2012 CFR
2012-10-01
... primary side of a single phase transformer (two wire with single-voltage secondary) also protects the... secondary conductor by the secondary to primary transformer voltage ratio, and this protection meets § 111...
46 CFR 169.684 - Overcurrent protection for motors and motor branch circuits.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at... motor that is responsive to motor current or to both motor current and temperature may be used. (b) The...
Protection of autonomous microgrids using agent-based distributed communication
Cintuglu, Mehmet H.; Ma, Tan; Mohammed, Osama A.
2016-04-06
This study presents a real-time implementation of autonomous microgrid protection using agent-based distributed communication. Protection of an autonomous microgrid requires special considerations compared to large scale distribution net-works due to the presence of power converters and relatively low inertia. In this work, we introduce a practical overcurrent and a frequency selectivity method to overcome conventional limitations. The proposed overcurrent scheme defines a selectivity mechanism considering the remedial action scheme (RAS) of the microgrid after a fault instant based on feeder characteristics and the location of the intelligent electronic devices (IEDs). A synchrophasor-based online frequency selectivity approach is proposed to avoidmore » pulse loading effects in low inertia microgrids. Experimental results are presented for verification of the pro-posed schemes using a laboratory based microgrid. The setup was composed of actual generation units and IEDs using IEC 61850 protocol. The experimental results were in excellent agreement with the proposed protection scheme.« less
Evacuated FM08 Fuses Carry a Sustained Arc in a Bus over 75 VDC
NASA Technical Reports Server (NTRS)
Leidecker, Henning; Slonaker, J.
1999-01-01
The FM08 style fuse is specified to interrupt an overcurrent of up to 300 A in a bus of up to 125 VDC, but this applies only when its barrel is filled with air. When placed into a space-grade vacuum, the FM08 style fuse exhausts its air within a year. Then, the probability of an enduring arc is high for all ratings when the bus is above 75 VDC, and the overcurrent is large. The arc endures until something else interrupts the current. The fuse can violently eject metal vapor or other material during the sustained arcing. The evacuated FM08 does not develop a sustained arc when interrupted in a bus of 38 VDC or less, at least when there is little inductance in the circuit. This is consistent with its successful use in many spacecraft having buses in the range 24 to 36 volts.
NASA Astrophysics Data System (ADS)
Ye, Lin; Majoros, M.; Campbell, A. M.; Coombs, T.; Harrison, S.; Sargent, P.; Haslett, M.; Husband, M.
2007-04-01
A laboratory scale desktop test system including a cryogenic system, an AC pulse generation system and a real time data acquisition program in LabView/DAQmx, has been developed to evaluate the quench properties of MgB2 wires as an element in a superconducting fault current limiter under pulse overcurrents at 25 K in self-field conditions. The MgB2 samples started from a superconducting state and demonstrated good current limiting properties characterized by a fast transition to the normal state during the first half of the cycle and a continuously limiting effect in the subsequent cycles without burnouts. The experimental and numerical simulation results on the quench behaviour indicate the feasibility of using MgB2 for future superconducting fault current limiter (SFCL) applications. This work is supported by Rolls-Royce Plc and the UK Department of Trade & Industry (DTI).
Protection of autonomous microgrids using agent-based distributed communication
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cintuglu, Mehmet H.; Ma, Tan; Mohammed, Osama A.
This study presents a real-time implementation of autonomous microgrid protection using agent-based distributed communication. Protection of an autonomous microgrid requires special considerations compared to large scale distribution net-works due to the presence of power converters and relatively low inertia. In this work, we introduce a practical overcurrent and a frequency selectivity method to overcome conventional limitations. The proposed overcurrent scheme defines a selectivity mechanism considering the remedial action scheme (RAS) of the microgrid after a fault instant based on feeder characteristics and the location of the intelligent electronic devices (IEDs). A synchrophasor-based online frequency selectivity approach is proposed to avoidmore » pulse loading effects in low inertia microgrids. Experimental results are presented for verification of the pro-posed schemes using a laboratory based microgrid. The setup was composed of actual generation units and IEDs using IEC 61850 protocol. The experimental results were in excellent agreement with the proposed protection scheme.« less
Synchronous Controlled Switching by VCB with Electromagnetic Operation Mechanism
NASA Astrophysics Data System (ADS)
Horinouchi, Katsuhiko; Tsukima, Mitsuru; Tohya, Nobumoto; Inoue, Ryuuichi; Sasao, Hiroyuki
Synchronously controlled switching to suppress transient overvoltage and overcurrent resulting from when the circuit breakers on medium voltage systems are closed is described. Firstly, by simulation it is found that if the closing time is synchronously controlled so that the contacts of the circuit breaker close completely at the instant when the voltage across contacts of the breaker at each of the three individual phases are zero, the resulting overvoltage and overcurrent is significantly suppressed when compared to conventional three phase simultaneous closing. Next, an algorithm for determining the closing timing based on a forecasted voltage zero waveform, obtained from voltage sampling data, is presented. Finally, a synchronous closing experiment of voltage 22kV utilizing a controller to implement the algorithm and a VCB with an electromagnetic operation mechanism is presented. The VCB was successfully closed at the zero point within a tolerance range of 200 microseconds.
46 CFR 111.50-2 - Systems integration.
Code of Federal Regulations, 2012 CFR
2012-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-2 Systems integration. The electrical characteristics of each... the design of the entire protective system. Note to § 111.50-2: The electrical characteristics of...
46 CFR 111.50-2 - Systems integration.
Code of Federal Regulations, 2014 CFR
2014-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-2 Systems integration. The electrical characteristics of each... the design of the entire protective system. Note to § 111.50-2: The electrical characteristics of...
46 CFR 111.50-2 - Systems integration.
Code of Federal Regulations, 2013 CFR
2013-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-2 Systems integration. The electrical characteristics of each... the design of the entire protective system. Note to § 111.50-2: The electrical characteristics of...
46 CFR 111.50-2 - Systems integration.
Code of Federal Regulations, 2011 CFR
2011-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-2 Systems integration. The electrical characteristics of each... the design of the entire protective system. Note to § 111.50-2: The electrical characteristics of...
46 CFR 129.395 - Radio installations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with... radios, if installed, may be powered from a local lighting power source, such as the pilothouse lighting panel, provided each radio power source has a separate overcurrent protection device. ...
46 CFR 129.395 - Radio installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with... radios, if installed, may be powered from a local lighting power source, such as the pilothouse lighting panel, provided each radio power source has a separate overcurrent protection device. ...
46 CFR 129.395 - Radio installations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with... radios, if installed, may be powered from a local lighting power source, such as the pilothouse lighting panel, provided each radio power source has a separate overcurrent protection device. ...
46 CFR 129.395 - Radio installations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with... radios, if installed, may be powered from a local lighting power source, such as the pilothouse lighting panel, provided each radio power source has a separate overcurrent protection device. ...
NASA Technical Reports Server (NTRS)
Praver, Gerald A.; Theisinger, Peter C.; Genofsky, John
1987-01-01
Functions of circuit breakers, meters, and switches combined. Circuit that includes power field-effect transistors (PFET's) provides on/off switching, soft starting, current monitoring, current tripping, and protection against overcurrent for 30-Vdc power supply at normal load currents up to 2 A. Has no moving parts.
46 CFR 111.15-25 - Overload and reverse current protection.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation... battery conductor, except conductors of engine cranking batteries and batteries with a nominal potential of 6 volts or less. For large storage battery installations, the overcurrent protective devices must...
29 CFR 1910.334 - Use of equipment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Safety-Related Work Practices § 1910.334 Use of equipment... allowed by § 1910.304(e), the installation safety requirements for overcurrent protection. (c) Test...
29 CFR 1910.334 - Use of equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Safety-Related Work Practices § 1910.334 Use of equipment... allowed by § 1910.304(e), the installation safety requirements for overcurrent protection. (c) Test...
46 CFR 111.15-25 - Overload and reverse current protection.
Code of Federal Regulations, 2013 CFR
2013-10-01
... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation... battery conductor, except conductors of engine cranking batteries and batteries with a nominal potential of 6 volts or less. For large storage battery installations, the overcurrent protective devices must...
46 CFR 111.15-25 - Overload and reverse current protection.
Code of Federal Regulations, 2014 CFR
2014-10-01
... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation... battery conductor, except conductors of engine cranking batteries and batteries with a nominal potential of 6 volts or less. For large storage battery installations, the overcurrent protective devices must...
46 CFR 111.15-25 - Overload and reverse current protection.
Code of Federal Regulations, 2011 CFR
2011-10-01
... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation... battery conductor, except conductors of engine cranking batteries and batteries with a nominal potential of 6 volts or less. For large storage battery installations, the overcurrent protective devices must...
46 CFR 111.15-25 - Overload and reverse current protection.
Code of Federal Regulations, 2012 CFR
2012-10-01
... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation... battery conductor, except conductors of engine cranking batteries and batteries with a nominal potential of 6 volts or less. For large storage battery installations, the overcurrent protective devices must...
46 CFR 111.50-9 - Disconnecting and guarding.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Disconnecting and guarding. 111.50-9 Section 111.50-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-9 Disconnecting and guarding. Disconnecting and...
46 CFR 111.50-9 - Disconnecting and guarding.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Disconnecting and guarding. 111.50-9 Section 111.50-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-9 Disconnecting and guarding. Disconnecting and...
46 CFR 111.50-9 - Disconnecting and guarding.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Disconnecting and guarding. 111.50-9 Section 111.50-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-9 Disconnecting and guarding. Disconnecting and...
46 CFR 111.50-9 - Disconnecting and guarding.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Disconnecting and guarding. 111.50-9 Section 111.50-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-9 Disconnecting and guarding. Disconnecting and...
30 CFR 75.814 - Electrical protection.
Code of Federal Regulations, 2013 CFR
2013-07-01
... protection must not be dependent upon control power and may consist of a current transformer and overcurrent... restarting of the equipment. (b) Current transformers used for the ground-fault protection specified in... series with ground-fault current transformers. (c) Each ground-fault current device specified in...
30 CFR 75.814 - Electrical protection.
Code of Federal Regulations, 2011 CFR
2011-07-01
... protection must not be dependent upon control power and may consist of a current transformer and overcurrent... restarting of the equipment. (b) Current transformers used for the ground-fault protection specified in... series with ground-fault current transformers. (c) Each ground-fault current device specified in...
30 CFR 75.814 - Electrical protection.
Code of Federal Regulations, 2014 CFR
2014-07-01
... protection must not be dependent upon control power and may consist of a current transformer and overcurrent... restarting of the equipment. (b) Current transformers used for the ground-fault protection specified in... series with ground-fault current transformers. (c) Each ground-fault current device specified in...
30 CFR 75.814 - Electrical protection.
Code of Federal Regulations, 2012 CFR
2012-07-01
... protection must not be dependent upon control power and may consist of a current transformer and overcurrent... restarting of the equipment. (b) Current transformers used for the ground-fault protection specified in... series with ground-fault current transformers. (c) Each ground-fault current device specified in...
30 CFR 75.814 - Electrical protection.
Code of Federal Regulations, 2010 CFR
2010-07-01
... protection must not be dependent upon control power and may consist of a current transformer and overcurrent... restarting of the equipment. (b) Current transformers used for the ground-fault protection specified in... series with ground-fault current transformers. (c) Each ground-fault current device specified in...
46 CFR 111.50-2 - Systems integration.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Systems integration. 111.50-2 Section 111.50-2 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Overcurrent Protection § 111.50-2 Systems integration. The electrical characteristics of each...
46 CFR 129.380 - Overcurrent protection.
Code of Federal Regulations, 2011 CFR
2011-10-01
... protection must be provided for each ungrounded conductor, to open the electric circuit if the current reaches a value that causes an excessive or dangerous temperature in the conductor or its insulation. (b) Each conductor of a control, interlock, or indicator circuit, such as a conductor for an instrument...
46 CFR 120.380 - Overcurrent protection.
Code of Federal Regulations, 2010 CFR
2010-10-01
... for each ungrounded conductor for the purpose of opening the electric circuit if the current reaches a value that causes an excessive or dangerous temperature in the conductor or conductor insulation. (b) The grounded conductor of a circuit must not be disconnected by a switch or circuit breaker, unless...
46 CFR 120.380 - Overcurrent protection.
Code of Federal Regulations, 2011 CFR
2011-10-01
... for each ungrounded conductor for the purpose of opening the electric circuit if the current reaches a value that causes an excessive or dangerous temperature in the conductor or conductor insulation. (b) The grounded conductor of a circuit must not be disconnected by a switch or circuit breaker, unless...
46 CFR 169.683 - Overcurrent protection, general.
Code of Federal Regulations, 2011 CFR
2011-10-01
... provided for each ungrounded conductor for the purpose of opening the electric circuit if the current reaches a value that causes an excessive or dangerous temperature in the conductor or conductor insulation... ungrounded conductors of the circuit simultaneously. (c) Each conductor, including a generator lead and shore...
46 CFR 129.395 - Radio installations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation. Additional...
30 CFR 75.824 - Electrical protection.
Code of Federal Regulations, 2010 CFR
2010-07-01
... transformer and over-current relay in the neutral grounding resistor circuit. (vi) A single window-type current transformer that encircles all three-phase conductors must be used to activate the ground-fault... current transformer. (vii) A test circuit for the ground-fault device must be provided. The test circuit...
30 CFR 75.824 - Electrical protection.
Code of Federal Regulations, 2012 CFR
2012-07-01
... transformer and over-current relay in the neutral grounding resistor circuit. (vi) A single window-type current transformer that encircles all three-phase conductors must be used to activate the ground-fault... current transformer. (vii) A test circuit for the ground-fault device must be provided. The test circuit...
30 CFR 75.824 - Electrical protection.
Code of Federal Regulations, 2014 CFR
2014-07-01
... transformer and over-current relay in the neutral grounding resistor circuit. (vi) A single window-type current transformer that encircles all three-phase conductors must be used to activate the ground-fault... current transformer. (vii) A test circuit for the ground-fault device must be provided. The test circuit...
30 CFR 75.824 - Electrical protection.
Code of Federal Regulations, 2011 CFR
2011-07-01
... transformer and over-current relay in the neutral grounding resistor circuit. (vi) A single window-type current transformer that encircles all three-phase conductors must be used to activate the ground-fault... current transformer. (vii) A test circuit for the ground-fault device must be provided. The test circuit...
30 CFR 75.824 - Electrical protection.
Code of Federal Regulations, 2013 CFR
2013-07-01
... transformer and over-current relay in the neutral grounding resistor circuit. (vi) A single window-type current transformer that encircles all three-phase conductors must be used to activate the ground-fault... current transformer. (vii) A test circuit for the ground-fault device must be provided. The test circuit...
46 CFR 129.380 - Overcurrent protection.
Code of Federal Regulations, 2014 CFR
2014-10-01
... emergency switch must be provided in each normally ungrounded main supply conductor from a battery. The switch must be accessible from the battery and located as close as practicable to it. (j) No grounded... type and be listed by Underwriters Laboratories (UL) or another independent laboratory recognized by...
46 CFR 129.380 - Overcurrent protection.
Code of Federal Regulations, 2013 CFR
2013-10-01
... emergency switch must be provided in each normally ungrounded main supply conductor from a battery. The switch must be accessible from the battery and located as close as practicable to it. (j) No grounded... type and be listed by Underwriters Laboratories (UL) or another independent laboratory recognized by...
46 CFR 120.380 - Overcurrent protection.
Code of Federal Regulations, 2013 CFR
2013-10-01
... provided in the normally ungrounded main supply conductor from a battery. The switch must be accessible and located as close to the battery as practicable. (j) Disconnect means must be provided on the supply side... of the cartridge type only and be listed by Underwriters Laboratories or another independent...
46 CFR 120.380 - Overcurrent protection.
Code of Federal Regulations, 2014 CFR
2014-10-01
... provided in the normally ungrounded main supply conductor from a battery. The switch must be accessible and located as close to the battery as practicable. (j) Disconnect means must be provided on the supply side... of the cartridge type only and be listed by Underwriters Laboratories or another independent...
46 CFR 129.380 - Overcurrent protection.
Code of Federal Regulations, 2012 CFR
2012-10-01
... emergency switch must be provided in each normally ungrounded main supply conductor from a battery. The switch must be accessible from the battery and located as close as practicable to it. (j) No grounded... type and be listed by Underwriters Laboratories (UL) or another independent laboratory recognized by...
46 CFR 120.380 - Overcurrent protection.
Code of Federal Regulations, 2012 CFR
2012-10-01
... provided in the normally ungrounded main supply conductor from a battery. The switch must be accessible and located as close to the battery as practicable. (j) Disconnect means must be provided on the supply side... of the cartridge type only and be listed by Underwriters Laboratories or another independent...
46 CFR 129.380 - Overcurrent protection.
Code of Federal Regulations, 2010 CFR
2010-10-01
... emergency switch must be provided in each normally ungrounded main supply conductor from a battery. The switch must be accessible from the battery and located as close as practicable to it. (j) No grounded... type and be listed by Underwriters Laboratories (UL) or another independent laboratory recognized by...
30 CFR 77.1801-1 - Devices for overcurrent protection.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Section 77.1801-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND... circuit at any point in the system will meet the requirements of § 77.1801. ...
46 CFR 111.70-7 - Remote control, interlock, and indicator circuits.
Code of Federal Regulations, 2011 CFR
2011-10-01
... difference in potential between the external conductors, overcurrent protection need only be at the supply of... to start. (c) Source of potential. The potential for a control, interlock, or indicator circuit must... disconnected from all sources of potential by a disconnect device independent of the motor and controller...
46 CFR 111.70-7 - Remote control, interlock, and indicator circuits.
Code of Federal Regulations, 2014 CFR
2014-10-01
... difference in potential between the external conductors, overcurrent protection need only be at the supply of... to start. (c) Source of potential. The potential for a control, interlock, or indicator circuit must... disconnected from all sources of potential by a disconnect device independent of the motor and controller...
46 CFR 111.70-7 - Remote control, interlock, and indicator circuits.
Code of Federal Regulations, 2013 CFR
2013-10-01
... difference in potential between the external conductors, overcurrent protection need only be at the supply of... to start. (c) Source of potential. The potential for a control, interlock, or indicator circuit must... disconnected from all sources of potential by a disconnect device independent of the motor and controller...
46 CFR 111.70-7 - Remote control, interlock, and indicator circuits.
Code of Federal Regulations, 2012 CFR
2012-10-01
... difference in potential between the external conductors, overcurrent protection need only be at the supply of... to start. (c) Source of potential. The potential for a control, interlock, or indicator circuit must... disconnected from all sources of potential by a disconnect device independent of the motor and controller...
46 CFR 111.70-7 - Remote control, interlock, and indicator circuits.
Code of Federal Regulations, 2010 CFR
2010-10-01
... difference in potential between the external conductors, overcurrent protection need only be at the supply of... to start. (c) Source of potential. The potential for a control, interlock, or indicator circuit must... disconnected from all sources of potential by a disconnect device independent of the motor and controller...
46 CFR 111.50-3 - Protection of conductors.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Protection of conductors. 111.50-3 Section 111.50-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS... of overcurrent protection for conductors is to open the electric circuit if the current reaches a...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Purpose. 111.51-1 Section 111.51-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Coordination of Overcurrent Protective Devices § 111.51-1 Purpose. The purpose of this subpart is to provide...
46 CFR 111.50-3 - Protection of conductors.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Protection of conductors. 111.50-3 Section 111.50-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS... of overcurrent protection for conductors is to open the electric circuit if the current reaches a...
46 CFR 111.51-3 - Protection of vital equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Protection of vital equipment. 111.51-3 Section 111.51-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Coordination of Overcurrent Protective Devices § 111.51-3 Protection of vital...
46 CFR 111.51-3 - Protection of vital equipment.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Protection of vital equipment. 111.51-3 Section 111.51-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Coordination of Overcurrent Protective Devices § 111.51-3 Protection of vital...
46 CFR 111.51-3 - Protection of vital equipment.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Protection of vital equipment. 111.51-3 Section 111.51-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Coordination of Overcurrent Protective Devices § 111.51-3 Protection of vital...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Purpose. 111.51-1 Section 111.51-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Coordination of Overcurrent Protective Devices § 111.51-1 Purpose. The purpose of this subpart is to provide...
46 CFR 111.50-3 - Protection of conductors.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Protection of conductors. 111.50-3 Section 111.50-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS... of overcurrent protection for conductors is to open the electric circuit if the current reaches a...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Purpose. 111.51-1 Section 111.51-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Coordination of Overcurrent Protective Devices § 111.51-1 Purpose. The purpose of this subpart is to provide...
46 CFR 111.51-3 - Protection of vital equipment.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Protection of vital equipment. 111.51-3 Section 111.51-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Coordination of Overcurrent Protective Devices § 111.51-3 Protection of vital...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Purpose. 111.51-1 Section 111.51-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Coordination of Overcurrent Protective Devices § 111.51-1 Purpose. The purpose of this subpart is to provide...
30 CFR 77.800 - High-voltage circuits; circuit breakers.
Code of Federal Regulations, 2010 CFR
2010-07-01
... devices to provide protection against under voltage, grounded phase, short circuit and overcurrent. High... 30 Mineral Resources 1 2010-07-01 2010-07-01 false High-voltage circuits; circuit breakers. 77.800... COAL MINES Surface High-Voltage Distribution § 77.800 High-voltage circuits; circuit breakers. High...
30 CFR 18.51 - Electrical protection of circuits and equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... the junction with the main circuit when the branch-circuit conductor(s) has a current carrying... same duty. (1) If the overcurrent-protective device in a direct-current circuit does not open both... preventing the possibility of reversing connections which would result in changing the circuit interrupter to...
30 CFR 18.51 - Electrical protection of circuits and equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the junction with the main circuit when the branch-circuit conductor(s) has a current carrying... same duty. (1) If the overcurrent-protective device in a direct-current circuit does not open both... preventing the possibility of reversing connections which would result in changing the circuit interrupter to...
46 CFR 183.380 - Overcurrent protection.
Code of Federal Regulations, 2014 CFR
2014-10-01
... emergency switch must be provided in the normally ungrounded main supply conductor from a battery. The switch must be accessible and located as close to the battery as practicable. (j) Disconnect means must... position. (l) Fuses must be of the cartridge type only and be listed by Underwriters Laboratories or...
46 CFR 183.380 - Overcurrent protection.
Code of Federal Regulations, 2012 CFR
2012-10-01
... emergency switch must be provided in the normally ungrounded main supply conductor from a battery. The switch must be accessible and located as close to the battery as practicable. (j) Disconnect means must... position. (l) Fuses must be of the cartridge type only and be listed by Underwriters Laboratories or...
46 CFR 183.380 - Overcurrent protection.
Code of Federal Regulations, 2013 CFR
2013-10-01
... emergency switch must be provided in the normally ungrounded main supply conductor from a battery. The switch must be accessible and located as close to the battery as practicable. (j) Disconnect means must... position. (l) Fuses must be of the cartridge type only and be listed by Underwriters Laboratories or...
46 CFR 111.12-11 - Generator protection.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Generator protection. 111.12-11 Section 111.12-11...-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-11 Generator protection. (a... shutting down of the prime mover; (2) Have longtime overcurrent trips or relays set as necessary to...
46 CFR 111.12-11 - Generator protection.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Generator protection. 111.12-11 Section 111.12-11...-GENERAL REQUIREMENTS Generator Construction and Circuits § 111.12-11 Generator protection. (a... shutting down of the prime mover; (2) Have longtime overcurrent trips or relays set as necessary to...
46 CFR 111.50-9 - Disconnecting and guarding.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Disconnecting and guarding. 111.50-9 Section 111.50-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS... guarding of overcurrent protective devices must meet Part IV of Article 240 of NFPA NEC 2002 (incorporated...
46 CFR 111.51-3 - Protection of vital equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... plant configurations. (b)Overcurrent protective devices must be installed so that: (1) A short-circuit on a circuit that is not vital to the propulsion, control, or safety of the vessel does not trip equipment that is vital; and (2) A short-circuit on a circuit that is vital to the propulsion, control, or...
30 CFR 18.50 - Protection against external arcs and sparks.
Code of Federal Regulations, 2014 CFR
2014-07-01
... volts. (c) A device(s) such as a diode(s) of adequate peak inverse voltage rating and current-carrying capacity to conduct possible fault current through the grounded power conductor. Diode installations shall include: (1) An overcurrent device in series with the diode, the contacts of which are in the machine's...
30 CFR 18.50 - Protection against external arcs and sparks.
Code of Federal Regulations, 2013 CFR
2013-07-01
... volts. (c) A device(s) such as a diode(s) of adequate peak inverse voltage rating and current-carrying capacity to conduct possible fault current through the grounded power conductor. Diode installations shall include: (1) An overcurrent device in series with the diode, the contacts of which are in the machine's...
30 CFR 18.50 - Protection against external arcs and sparks.
Code of Federal Regulations, 2012 CFR
2012-07-01
... volts. (c) A device(s) such as a diode(s) of adequate peak inverse voltage rating and current-carrying capacity to conduct possible fault current through the grounded power conductor. Diode installations shall include: (1) An overcurrent device in series with the diode, the contacts of which are in the machine's...
Quench dynamics in MgB2 Rutherford cables
NASA Astrophysics Data System (ADS)
Cubero, A.; Navarro, R.; Kováč, P.; Kopera, L.; Rindfleisch, M.; Martínez, E.
2018-04-01
The generation and propagation of quench induced by a local heat disturbance or by overcurrents in MgB2 Rutherford cables have been studied experimentally. The analysed cable is composed of 12 strands of monocore MgB2/Nb/Cu10Ni wire and has a transposition length of about 27 mm. Measurements of intra- and inter-strand voltages have been performed to analyse the superconducting-to-normal transition behaviour of these cables during quench. In case of external hot-spots, two different time-dynamic regimes have been observed, a slow stage for the formation of the minimum propagation zone (MPZ), and a fast dynamics once the quench is triggered and propagates to the rest of the cable. Significant local variations of the quench propagation velocity across the strands around the MPZ have been observed, but with average quench propagation velocities closely correlated with the predictions given by one-dimensional-geometry models. For quench induced by overcurrents (i.e. with applied currents higher than the critical current) the nucleation of many normal zones distributed within the cable, which overlap during quench propagation, gives a distinctive and faster quench dynamics.
Temperature Diffusion Distribution of Electric Wire Deteriorated by Overcurrent
NASA Astrophysics Data System (ADS)
Choi, Chung-Seog; Kim, Hyang-Kon; Kim, Dong-Woo; Lee, Ki-Yeon
This study presents thermal diffusion distribution of the electric wires when overcurrent is supplied to copper wires. And then, this study intends to provide a basis of knowledge for analyzing the causes of electric accidents through hybrid technology. In the thermal image distribution analysis of the electric wire to which fusing current was supplied, it was found that less heat was accumulated in the thin wires because of easier heat dispersion, while more heat was accumulated in the thicker wires. The 3-dimensional thermal image analysis showed that heat distribution was concentrated at the center of the wire and the inclination of heat distribution was steep in the thicker wires. When 81A was supplied to 1.6mm copper wire for 500 seconds, the surface temperature of wire was maximum 46.68°C and minimum 30.87°C. It revealed the initial characteristics of insulation deterioration that generates white smoke without external deformation. In the analysis with stereoscopic microscope, the surface turned dark brown and rough with the increase of fusing current. Also, it was known that exfoliation occurred when wire melted down with 2 times the fusing current. With the increase of current, we found the number of primary arms of the dendrite structure to be increased and those of the secondary and tertiary arms to be decreased. Also, when the overcurrent reached twice the fusing current, it was found that columnar composition, observed in the cross sectional structure of molten wire, appeared and formed regular directivity. As described above, we could present the burning pattern and change in characteristics of insulation and conductor quantitatively. And we could not only minimize the analysis error by combining the information but also present the scientific basis in the analysis of causes of electric accidents, mediation of disputes on product liability concerning the electric products.
Liftoff of the 18 May 1980 surge of Mount St. Helens (USA) and the deposits left behind
NASA Astrophysics Data System (ADS)
Gardner, James E.; Andrews, Benjamin J.; Dennen, Robert
2017-01-01
The distance that ground-hugging pyroclastic density currents travel is limited partly by when they reverse buoyancy and liftoff into the atmosphere. It is not clear, however, what deposits are left behind by lofting flows. One current that was seen to liftoff was the surge erupted from Mount St. Helens on the morning of 18 May 1980. Before lofting, it had leveled a large area of thick forest (the blowdown zone). The outer edge of the devastated area—where trees were scorched but left standing (the scorched zone)—is where the surge is thought to have lifted off. Deposits in the outer parts of the blowdown and in the scorched zone were examined at 32 sites. The important finding is that the laterally moving surge traveled through the scorched zone, and hence, the change in tree damage does not mark the runout distance of the surge. Buoyancy reversal and liftoff are thus not preserved in the deposits where the surge lofted upwards. We propose, based on interpretation of eyewitness accounts and the impacts of the surge on trees and vehicles, that the surge consisted of a faster, dilute "overcurrent" and a slower "undercurrent," where most of the mass (and heat) was retained. Reasonable estimates for flow density and velocity show that dynamic pressure of the surge (i.e., its ability to topple trees) peaked near the base of the overcurrent. We propose that where the overcurrent began to liftoff, the height of peak dynamic pressure rose above the trees and stopped toppling them. The slower undercurrent continued forward, however, scorching trees, but lacked the dynamic pressure needed to topple them. Grain-size variations argue that it slowed from ˜30 m s-1 when it entered the scorched zone to ˜3 m s-1 at the far end.
NASA Astrophysics Data System (ADS)
Gardner, J. E.; Andrews, B. J.
2016-12-01
Pyroclastic density currents (flows and surges) are one of the most deadly hazards associated with volcanic eruptions. Understanding what controls how far such currents will travel, and how their dynamic pressure evolves, could help mitigate their hazards. The distance a ground hugging, pyroclastic density current travels is partly limited by when it reverses buoyancy and lifts off into the atmosphere. The 1980 blast surge of Mount St. Helens offers an example of a current seen to lift off. Before lofting, it had traveled up to 20 km and leveled more than 600 km3 of thick forest (the blowdown zone). The outer edge of the devastated area - where burned trees that were left standing (the singe zone) - is where the surge is thought to have lifted off. We recently examined deposits in the outer parts of the blowdown and in the singe zone at 32 sites. The important finding is that the laterally moving surge travelled into the singe zone, and hence the change in tree damage does not mark the run out distance of the ground hugging surge. Eyewitness accounts and impacts on trees and vehicles reveal that the surge consisted of a fast, dilute "overcurrent" and a slower "undercurrent", where most of the mass (and heat) was retained. Reasonable estimates for flow density and velocity show that dynamic pressure of the surge (i.e., its ability to topple trees) peaked near the base of the overcurrent. We propose that when the overcurrent began to lift off, the height of peak dynamic pressure rose above the trees and stopped toppling them. The slower undercurrent continued forward, burning trees but it lacked the dynamic pressure needed to topple them. Grain-size variations argue that it slowed from 30 m/s when it entered the singe zone to 3 m/s at the far end. Buoyancy reversal and liftoff are thus not preserved in the deposits where the surge lofted upwards.
Illustration of distributed generation effects on protection system coordination
NASA Astrophysics Data System (ADS)
Alawami, Hussain Adnan
Environmental concerns, market forces, and emergence of new technologies have recently resulted in restructuring electric utility from vertically integrated networks to competitive deregulated entities. Distributed generation (DG) is playing a major role in such deregulated markets. When they are installed in small amounts and small sizes, their impacts on the system may be negligible. When their penetration levels increase as well as their sizes, however, they may start affecting the system performance from more than one aspect. Power system protection needs to be re-assessed after the emergence of DG. This thesis attempts to illustrate the impact of DG on the power system protection coordination. It will study the operation of the impedance relays, fuses, reclosers and overcurrent relays when a DG is added to the distribution network. Different DG sizes, distances from the network and locations within the distribution system will be considered. Power system protection coordination is very sensitive to the DG size where it is not for the DG distance. DG location has direct impact on the operation of the protective devices especially when it is inserted in the middle point of the distribution system. Key Words, Distributed Generation, Impedance relay, fuses, reclosers, overcurrent relays, power system protection coordination.
NASA Astrophysics Data System (ADS)
Cai, Guowei; Liu, Cheng; Yang, Deyou
2013-11-01
The doubly fed induction generators (DFIG) have been recognized as the dominant technology used in wind power generation systems with the rapid development of wind power. However, continuous operation of DFIG may cause a serious wind turbine generators tripping accident, due to destructive over-current in the rotor winding which is caused by the power system fault or inefficient fault ride-through (FRT) strategy. A new rotor current control scheme in the rotor-side converter (RSC) ispresented to enhance FRT capacities of grid-connected DFIG. Due to the strongly nonlinear nature of DFIG and insensitive to DFIG parameter's variations, a novel sliding mode controller was designed. The controller combines extended state observer (ESO) with sliding model variable structure control theory. The simulation is carried out to verify the effectiveness of the proposed control approach under various types of grid disturbances. It is shown that the proposed controller provides enhanced transient features than the classic proportional-integral control. The proposed control method can effectively reduce over-current in the RSC, and the transient pulse value of electromagnetic torque is too large under power grid fault.
Survey on the implementation and reliability of CubeSat electrical bus interfaces
NASA Astrophysics Data System (ADS)
Bouwmeester, Jasper; Langer, Martin; Gill, Eberhard
2017-06-01
This paper provides results and conclusions on a survey on the implementation and reliability aspects of CubeSat bus interfaces, with an emphasis on the data bus and power distribution. It provides recommendations for a future CubeSat bus standard. The survey is based on a literature study and a questionnaire representing 60 launched CubeSats and 44 to be launched CubeSats. It is found that the bus interfaces are not the main driver for mission failures. However, it is concluded that the Inter Integrated Circuit (I2C) data bus, as implemented in a great majority of the CubeSats, caused some catastrophic satellite failures and a vast amount of bus lockups. The power distribution may lead to catastrophic failures if the power lines are not protected against overcurrent. A connector and wiring standard widely implemented in CubeSats is based on the PC/104 standard. Most participants find the 104 pin connector of this standard too large. For a future CubeSat bus interface standard, it is recommended to implement a reliable data bus, a power distribution with overcurrent protection and a wiring harness with smaller connectors compared with PC/104.
A Generalised Fault Protection Structure Proposed for Uni-grounded Low-Voltage AC Microgrids
NASA Astrophysics Data System (ADS)
Bui, Duong Minh; Chen, Shi-Lin; Lien, Keng-Yu; Jiang, Jheng-Lun
2016-04-01
This paper presents three main configurations of uni-grounded low-voltage AC microgrids. Transient situations of a uni-grounded low-voltage (LV) AC microgrid (MG) are simulated through various fault tests and operation transition tests between grid-connected and islanded modes. Based on transient simulation results, available fault protection methods are proposed for main and back-up protection of a uni-grounded AC microgrid. In addition, concept of a generalised fault protection structure of uni-grounded LVAC MGs is mentioned in the paper. As a result, main contributions of the paper are: (i) definition of different uni-grounded LVAC MG configurations; (ii) analysing transient responses of a uni-grounded LVAC microgrid through line-to-line faults, line-to-ground faults, three-phase faults and a microgrid operation transition test, (iii) proposing available fault protection methods for uni-grounded microgrids, such as: non-directional or directional overcurrent protection, under/over voltage protection, differential current protection, voltage-restrained overcurrent protection, and other fault protection principles not based on phase currents and voltages (e.g. total harmonic distortion detection of currents and voltages, using sequence components of current and voltage, 3I0 or 3V0 components), and (iv) developing a generalised fault protection structure with six individual protection zones to be suitable for different uni-grounded AC MG configurations.
Capacitor charging FET switcher with controller to adjust pulse width
Mihalka, Alex M.
1986-01-01
A switching power supply includes an FET full bridge, a controller to drive the FETs, a programmable controller to dynamically control final output current by adjusting pulse width, and a variety of protective systems, including an overcurrent latch for current control. Power MOSFETS are switched at a variable frequency from 20-50 kHz to charge a capacitor load from 0 to 6 kV. A ferrite transformer steps up the DC input. The transformer primary is a full bridge configuration with the FET switches and the secondary is fed into a high voltage full wave rectifier whose output is connected directly to the energy storage capacitor. The peak current is held constant by varying the pulse width using predetermined timing resistors and counting pulses. The pulse width is increased as the capacitor charges to maintain peak current. A digital ripple counter counts pulses, and after the desired number is reached, an up-counter is clocked. The up-counter output is decoded to choose among different resistors used to discharge a timing capacitor, thereby determining the pulse width. A current latch shuts down the supply on overcurrent due to either excessive pulse width causing transformer saturation or a major bridge fault, i.e., FET or transformer failure, or failure of the drive circuitry.
2015-06-21
problem was detected . Protection elements were implemented to trigger on over- voltage , over-current, over/under-frequency, and zero-sequence voltage ...power hardware in the loop simulation of distribution networks with photovoltaic generation,” International Journal of Renewable Energy Research...source modules were intended to support both emulation of a representative gas turbine generator set, as well as a flexible, controllable voltage source
Power supply system for negative ion source at IPR
NASA Astrophysics Data System (ADS)
Gahlaut, Agrajit; Sonara, Jashwant; Parmar, K. G.; Soni, Jignesh; Bandyopadhyay, M.; Singh, Mahendrajit; Bansal, Gourab; Pandya, Kaushal; Chakraborty, Arun
2010-02-01
The first step in the Indian program on negative ion beams is the setting up of Negative ion Experimental Assembly - RF based, where 100 kW of RF power shall be coupled to a plasma source producing plasma of density ~5 × 1012 cm-3, from which ~ 10 A of negative ion beam shall be produced and accelerated to 35 kV, through an electrostatic ion accelerator. The experimental system is modelled similar to the RF based negative ion source, BATMAN presently operating at IPP, Garching, Germany. The mechanical system for Negative Ion Source Assembly is close to the IPP source, remaining systems are designed and procured principally from indigenous sources, keeping the IPP configuration as a base line. High voltage (HV) and low voltage (LV) power supplies are two key constituents of the experimental setup. The HV power supplies for extraction and acceleration are rated for high voltage (~15 to 35kV), and high current (~ 15 to 35A). Other attributes are, fast rate of voltage rise (< 5ms), good regulation (< ±1%), low ripple (< ±2%), isolation (~50kV), low energy content (< 10J) and fast cut-off (< 100μs). The low voltage (LV) supplies required for biasing and providing heating power to the Cesium oven and the plasma grids; have attributes of low ripple, high stability, fast and precise regulation, programmability and remote operation. These power supplies are also equipped with over-voltage, over-current and current limit (CC Mode) protections. Fault diagnostics, to distinguish abnormal rise in currents (breakdown faults) with over-currents is enabled using fast response breakdown and over-current protection scheme. To restrict the fault energy deposited on the ion source, specially designed snubbers are implemented in each (extraction and acceleration) high voltage path to swap the surge energy. Moreover, the monitoring status and control signals from these power supplies are required to be electrically (~ 50kV) isolated from the system. The paper shall present the design basis, topology selection, manufacturing, testing, commissioning, integration and control strategy of these HVPS. A complete power interconnection scheme, which includes all protective devices and measuring devices, low & high voltage power supplies, monitoring and control signals etc. shall also be discussed. The paper also discusses the protocols involved in grounding and shielding, particularly in operating the system in RF environment.
Influence of winding construction on starter-generator thermal processes
NASA Astrophysics Data System (ADS)
Grachev, P. Yu; Bazarov, A. A.; Tabachinskiy, A. S.
2018-01-01
Dynamic processes in starter-generators features high winding are overcurrent. It can lead to insulation overheating and fault operation mode. For hybrid and electric vehicles, new high efficiency construction of induction machines windings is proposed. Stator thermal processes need be considered in the most difficult operation modes. The article describes construction features of new compact stator windings, electromagnetic and thermal models of processes in stator windings and explains the influence of innovative construction on thermal processes. Models are based on finite element method.
Kilovolt dc solid state remote power controller development
NASA Technical Reports Server (NTRS)
Mitchell, J. T.
1982-01-01
The experience gained in developing and applying solid state power controller (SSPC) technology at high voltage dc (HVDC) potentials and power levels of up to 25 kilowatts is summarized. The HVDC switching devices, power switching concepts, drive circuits, and very fast acting overcurrent protection circuits were analyzed. A 25A bipolar breadboard with Darlington connected switching transistor was built. Fault testing at 900 volts was included. A bipolar transistor packaged breadboard design was developed. Power MOSFET remote power controller (RPC) was designed.
NASA Technical Reports Server (NTRS)
Mitchell, J.; Jones, K.
1986-01-01
High current and voltage controlled remotely. Remote Power Conroller includes two series-connected banks of parallel-connected MOSFET's to withstand high current and voltage. Voltage sharing between switch banks, low-impedance, gate-drive circuits used. Provided controlled range for turn on. Individually trimmable to insure simultaneous switching within few nanoseconds during both turn on and turn off. Control circuit for each switch bank and over-current trip circuit float independently and supplied power via transformer T1 from inverter. Control of floating stages by optocouplers.
Impact analysis of tap switch out of step for converter transformer
NASA Astrophysics Data System (ADS)
Hong-yue, ZHANG; Zhen-hua, ZHANG; Zhang-xue, XIONG; Gao-wang, YU
2017-06-01
AC transformer load regulation is mainly used to adjust the load side voltage level, improve the quality of power supply, the voltage range is relatively narrow. In DC system, converter transformer is the core equipment of AC and DC power converter and inverter. converter transformer tap adjustment can maintain the normal operation of the converter in small angle range control, the absorption of reactive power, economic operation, valve less stress, valve damping circuit loss, AC / DC harmonic component is also smaller. In this way, the tap switch action is more frequent, and a large range of the tap switch adjustment is required. Converter transformer with a more load voltage regulation switch, the voltage regulation range of the switch is generally 20~30%, the adjustment of each file is 1%~2%. Recently it is often found that the tap switch of Converter Transformers is out of step in Converter station. In this paper, it is analyzed in detail the impact of tap switch out of step for differential protection, overexcitation protection and zero sequence over current protection. Analysis results show that: the tap switch out of step has no effect on the differential protection and the overexcitation protection including the tap switch. But the tap switch out of step has effect on zero sequence overcurrent protection of out of step star-angle converter transformer. The zero sequence overcurrent protection will trip when the tap switch out of step is greater than 3 for out of step star-angle converter transformer.
NASA Technical Reports Server (NTRS)
Bennett, William; Baldwin, Richard
2007-01-01
The NASA Glenn Research Center (GRC) Electrochemistry Branch designed and produced five lithium-ion battery packs for demonstration in a portable life support system (PLSS) on spacesuit simulators. The experimental batteries incorporated advanced, NASA-developed electrolytes and included internal protection against over-current, over-discharge and over-temperature. The 500-gram batteries were designed to deliver a constant power of 38 watts over 103 minutes of discharge time (130 Wh/kg). Battery design details are described and field and laboratory test results are summarized.
Advanced microprocessor based power protection system using artificial neural network techniques
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, Z.; Kalam, A.; Zayegh, A.
This paper describes an intelligent embedded microprocessor based system for fault classification in power system protection system using advanced 32-bit microprocessor technology. The paper demonstrates the development of protective relay to provide overcurrent protection schemes for fault detection. It also describes a method for power fault classification in three-phase system based on the use of neural network technology. The proposed design is implemented and tested on a single line three phase power system in power laboratory. Both the hardware and software development are described in detail.
Groombridge, Clifton E.
1996-01-01
An improvement to a coal processing system where hard materials found in the coal may cause jamming of either inflow or outflow rotary airlocks, each driven by a reversible motor. The instantaneous current used by the motor is continually monitored and compared to a predetermined value. If an overcurrent condition occurs, indicating a jamming of the airlock, a controller means starts a "soft" reverse rotation of the motor thereby clearing the jamming. Three patterns of the motor reversal are provided.
14. CONTROL PANELS, EAST SIDE, MAIN FLOOR: TO LEFT (ORIGINAL ...
14. CONTROL PANELS, EAST SIDE, MAIN FLOOR: TO LEFT (ORIGINAL EQUIPMENT): UPPER FOUR GLASS BOXES ARE OVERCURRENT PROTECTIVE RELAYS; MIDDLE FOUR GLASS BOXES CONTAIN TESTING SWITCHES; LOWER TWO BOXES ARE DG1 METERING CHART RECORDERS TO RIGHT (MODERN EQUIPMENT): UPPER FOUR BLACK BOXES ARE PROTECTIVE SERVICE RELAYS; MIDDLE FOUR BOXES CONTAIN TESTING SWITCHES; LARGE BOX BELOW HOUSES REMOTE METERING SYSTEM METAL CABINETS (LABELED L-2 & L-4) BELOW CONTAIN ORIGINAL POWER CIRCUIT BREAKERS - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR
Fault Analysis in Solar Photovoltaic Arrays
NASA Astrophysics Data System (ADS)
Zhao, Ye
Fault analysis in solar photovoltaic (PV) arrays is a fundamental task to increase reliability, efficiency and safety in PV systems. Conventional fault protection methods usually add fuses or circuit breakers in series with PV components. But these protection devices are only able to clear faults and isolate faulty circuits if they carry a large fault current. However, this research shows that faults in PV arrays may not be cleared by fuses under some fault scenarios, due to the current-limiting nature and non-linear output characteristics of PV arrays. First, this thesis introduces new simulation and analytic models that are suitable for fault analysis in PV arrays. Based on the simulation environment, this thesis studies a variety of typical faults in PV arrays, such as ground faults, line-line faults, and mismatch faults. The effect of a maximum power point tracker on fault current is discussed and shown to, at times, prevent the fault current protection devices to trip. A small-scale experimental PV benchmark system has been developed in Northeastern University to further validate the simulation conclusions. Additionally, this thesis examines two types of unique faults found in a PV array that have not been studied in the literature. One is a fault that occurs under low irradiance condition. The other is a fault evolution in a PV array during night-to-day transition. Our simulation and experimental results show that overcurrent protection devices are unable to clear the fault under "low irradiance" and "night-to-day transition". However, the overcurrent protection devices may work properly when the same PV fault occurs in daylight. As a result, a fault under "low irradiance" and "night-to-day transition" might be hidden in the PV array and become a potential hazard for system efficiency and reliability.
Design and evaluation of 66 kV-class HTS power cable using REBCO wires
NASA Astrophysics Data System (ADS)
Ohya, M.; Yumura, H.; Masuda, T.; Amemiya, N.; Ishiyama, A.; Ohkuma, T.
2011-11-01
Sumitomo Electric (SEI) has been involved in the development of 66 kV-class HTS cables using REBCO wires. One of the technical targets in this project is to reduce the AC loss to less than 2 W/m/phase at 5 kA. SEI has developed a clad-type of textured metal substrate with lower magnetization loss compared with a conventional NiW substrate. In addition, 30 mm-wide REBCO tapes were slit into 4 mm-wide strips, and these strips were wound spirally on a former with small gaps. The AC loss of a manufactured 4-layer cable conductor was 1.5 W/m at 5 kA at 64 K. Given that the AC loss in a shield layer is supposed to be one-fourth of a whole cable core loss, our cables are expected to achieve the AC loss target of less than 2 W/m/phase at 5 kA. Another important target is to manage a fault current. A cable core was designed and fabricated based on the simulation findings, and over-current tests (max. 31.5 kA, 2 s) were conducted to check its performance. The critical current value of the cable cores were measured before and after the over-current tests and verified its soundness. A 5 kA-class current lead for the cable terminations was also developed. The current loading tests were conducted for the developed current leads. The temperature distribution of the current leads reached to the steady-state within less than 12 h, and it was confirmed that the developed current lead has enough capacity of 5 kA loading.
Intelligent vehicle electrical power supply system with central coordinated protection
NASA Astrophysics Data System (ADS)
Yang, Diange; Kong, Weiwei; Li, Bing; Lian, Xiaomin
2016-07-01
The current research of vehicle electrical power supply system mainly focuses on electric vehicles (EV) and hybrid electric vehicles (HEV). The vehicle electrical power supply system used in traditional fuel vehicles is rather simple and imperfect; electrical/electronic devices (EEDs) applied in vehicles are usually directly connected with the vehicle's battery. With increasing numbers of EEDs being applied in traditional fuel vehicles, vehicle electrical power supply systems should be optimized and improved so that they can work more safely and more effectively. In this paper, a new vehicle electrical power supply system for traditional fuel vehicles, which accounts for all electrical/electronic devices and complex work conditions, is proposed based on a smart electrical/electronic device (SEED) system. Working as an independent intelligent electrical power supply network, the proposed system is isolated from the electrical control module and communication network, and access to the vehicle system is made through a bus interface. This results in a clean controller power supply with no electromagnetic interference. A new practical battery state of charge (SoC) estimation method is also proposed to achieve more accurate SoC estimation for lead-acid batteries in traditional fuel vehicles so that the intelligent power system can monitor the status of the battery for an over-current state in each power channel. Optimized protection methods are also used to ensure power supply safety. Experiments and tests on a traditional fuel vehicle are performed, and the results reveal that the battery SoC is calculated quickly and sufficiently accurately for battery over-discharge protection. Over-current protection is achieved, and the entire vehicle's power utilization is optimized. For traditional fuel vehicles, the proposed vehicle electrical power supply system is comprehensive and has a unified system architecture, enhancing system reliability and security.
DC isolation and protection system and circuit
NASA Technical Reports Server (NTRS)
Wagner, Charles A. (Inventor); Kellogg, Gary V. (Inventor)
1991-01-01
A precision analog electronic circuit that is capable of sending accurate signals to an external device that has hostile electric characteristics, including the presence of very large common mode voltages. The circuit is also capable of surviving applications of normal mode overvoltages of up to 120 VAC/VDC for unlimited periods of time without damage or degradation. First, the circuit isolates the DC signal output from the computer. Means are then provided for amplifying the isolated DC signal. Further means are provided for stabilizing and protecting the isolating and amplifying means, and the isolated and amplified DC signal which is output to the external device, against overvoltages and overcurrents.
Fast-acting self-healing metallic fuse.
NASA Technical Reports Server (NTRS)
Schwartz, F. C.; Renton, C. A.; Rabinovici, B.
1971-01-01
Description of a fast-acting nonmechanical self-healing mercury fuse capable of protecting a high current circuit or device from overcurrent fault damages. Basically the self-healing fuse consists of two enclosed mercury reservoirs connected by a fine capillary tube filled with mercury that serves as the fusing element. It is pointed out that a better understanding of the energy conversion process involved in the operation of the device could help explore other device configurations (such as a tapering geometry and use of magnetic field to drive the arc into the fuse wall on inductive loads, etc.) and thus extend the range of capabilities for this type of protective device.
System and method for quench and over-current protection of superconductor
Huang, Xianrui; Laskaris, Evangelos Trifon; Sivasubramaniam, Kiruba Haran; Bray, James William; Ryan, David Thomas; Fogarty, James Michael; Steinbach, Albert Eugene
2005-05-31
A system and method for protecting a superconductor. The system may comprise a current sensor operable to detect a current flowing through the superconductor. The system may comprise a coolant temperature sensor operable to detect the temperature of a cryogenic coolant used to cool the superconductor to a superconductive state. The control circuit is operable to estimate the superconductor temperature based on the current flow and the coolant temperature. The system may also be operable to compare the estimated superconductor temperature to at least one threshold temperature and to initiate a corrective action when the superconductor temperature exceeds the at least one threshold temperature.
The variable magnetic baffle as a control device for Kaufman thrusters.
NASA Technical Reports Server (NTRS)
Poeschel, R. L.
1972-01-01
The variable magnetic baffle described in this paper aids in control of electron flow from the hollow cathode plasma into the main discharge region by augmenting the fringe magnetic field which impedes this electron flow in conventionally baffled Kaufman thrusters. A passive, low loss, and automatic control device is obtained by using the discharge current to excite the control winding. Used in conjunction with typical thruster control loops, stable operation has been obtained over a 10:1 throttling range with a 30 cm thruster. Discharge ignition and overcurrent recycling is also facilitated through use of this device in a permanent magnet thruster.
Fault Analysis and Detection in Microgrids with High PV Penetration
DOE Office of Scientific and Technical Information (OSTI.GOV)
El Khatib, Mohamed; Hernandez Alvidrez, Javier; Ellis, Abraham
In this report we focus on analyzing current-controlled PV inverters behaviour under faults in order to develop fault detection schemes for microgrids with high PV penetration. Inverter model suitable for steady state fault studies is presented and the impact of PV inverters on two protection elements is analyzed. The studied protection elements are superimposed quantities based directional element and negative sequence directional element. Additionally, several non-overcurrent fault detection schemes are discussed in this report for microgrids with high PV penetration. A detailed time-domain simulation study is presented to assess the performance of the presented fault detection schemes under different microgridmore » modes of operation.« less
Protection of Renewable-dominated Microgrids: Challenges and Potential Solutions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elkhatib, Mohamed; Ellis, Abraham; Milan Biswal
keywords : Microgrid Protection, Impedance Relay, Signal Processing-based Fault Detec- tion, Networked Microgrids, Communication-Assisted Protection In this report we address the challenge of designing efficient protection system for inverter- dominated microgrids. These microgrids are characterised with limited fault current capacity as a result of current-limiting protection functions of inverters. Typically, inverters limit their fault contribution in sub-cycle time frame to as low as 1.1 per unit. As a result, overcurrent protection could fail completely to detect faults in inverter-dominated microgrids. As part of this project a detailed literature survey of existing and proposed microgrid protection schemes were conducted. The surveymore » concluded that there is a gap in the available microgrid protection methods. The only credible protection solution available in literature for low- fault inverter-dominated microgrids is the differential protection scheme which represents a robust transmission-grade protection solution but at a very high cost. Two non-overcurrent protection schemes were investigated as part of this project; impedance-based protection and transient-based protection. Impedance-based protection depends on monitoring impedance trajectories at feeder relays to detect faults. Two communication-based impedance-based protection schemes were developed. the first scheme utilizes directional elements and pilot signals to locate the fault. The second scheme depends on a Central Protection Unit that communicates with all feeder relays to locate the fault based on directional flags received from feeder relays. The later approach could potentially be adapted to protect networked microgrids and dynamic topology microgrids. Transient-based protection relies on analyzing high frequency transients to detect and locate faults. This approach is very promising but its implementation in the filed faces several challenges. For example, high frequency transients due to faults can be confused with transients due to other events such as capacitor switching. Additionally, while detecting faults by analyzing transients could be doable, locating faults based on analyzing transients is still an open question.« less
Protection of Renewable-dominated Microgrids: Challenges and Potential Solutions
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elkhatib, Mohamed; Ellis, Abraham; Biswal, Milan
In this report we address the challenge of designing efficient protection system for inverter- dominated microgrids. These microgrids are characterised with limited fault current capacity as a result of current-limiting protection functions of inverters. Typically, inverters limit their fault contribution in sub-cycle time frame to as low as 1.1 per unit. As a result, overcurrent protection could fail completely to detect faults in inverter-dominated microgrids. As part of this project a detailed literature survey of existing and proposed microgrid protection schemes were conducted. The survey concluded that there is a gap in the available microgrid protection methods. The only crediblemore » protection solution available in literature for low- fault inverter-dominated microgrids is the differential protection scheme which represents a robust transmission-grade protection solution but at a very high cost. Two non-overcurrent protection schemes were investigated as part of this project; impedance-based protection and transient-based protection. Impedance-based protection depends on monitoring impedance trajectories at feeder relays to detect faults. Two communication-based impedance-based protection schemes were developed. the first scheme utilizes directional elements and pilot signals to locate the fault. The second scheme depends on a Central Protection Unit that communicates with all feeder relays to locate the fault based on directional flags received from feeder relays. The later approach could potentially be adapted to protect networked microgrids and dynamic topology microgrids. Transient-based protection relies on analyzing high frequency transients to detect and locate faults. This approach is very promising but its implementation in the filed faces several challenges. For example, high frequency transients due to faults can be confused with transients due to other events such as capacitor switching. Additionally, while detecting faults by analyzing transients could be doable, locating faults based on analyzing transients is still an open question.« less
Microcomputer control of an electronically commutated dc motor
NASA Astrophysics Data System (ADS)
El-Sharkawi, M. A.; Coleman, J. S.; Mehdi, I. S.; Sommer, D. L.
A microcomputer control system for an electronically commutated dc motor (ECM) has been designed, built and tested. A 3-hp, 270-volt, samarium-cobalt brushless dc motor is controlled by an Intel 8086-based microcomputer. The main functions of the microcomputer are to control the speed of the motor, to provide forward or reverse rotation, to brake, and to protect the motor and its power electronic switching circuits from overcurrents. The necessary interface circuits were designed and built, and the system components have been integrated and tested. It is shown that the proposed ECM system with the microcomputer control operate the motor reliably over a wide range of speeds. The purpose of this effort is to develop the motorcontroller for driving electromechanical actuators for flight control and other aircraft applications.
NASA Astrophysics Data System (ADS)
Song, Jung-Bin; Lee, Haigun
2012-12-01
A cooling system employing a solid cryogen (SC), such as solid nitrogen (SN2), was recently reported for high-temperature superconducting (HTS) applications. However, thermal contact between the SC and the HTS can be degraded by repeated overcurrent runs, resulting in 'thermal dry-out'. Novel cryogens, SC with small amounts of liquid cryogen, have been suggested to overcome this problem. Such cooling systems rely on the small amount of liquid cryogen to facilitate heat exchange so as to fully exploit the heat capacity of the solid cryogen. This paper presents a description and summary of recent activities at Korea University related to cooling systems employing mixed cryogens of solid-liquid nitrogen, solid argon-liquid nitrogen, and solid nitrogen-liquid neon.
Overview of GSE as a multifunctional GUI
NASA Astrophysics Data System (ADS)
Kurtovich, Boyan; Malangone, Fabio; Voss, David L.; Carssow, Douglas B.; Fritz, Theodore A.; Mavretic, Anton
2009-08-01
Ground Support Equipment (GSE) [1] is a versatile and multifunctional graphical user interface (GUI) and a software/hardware platform. It is a custom-designed system executed in the LabVIEW programming language to serve as an instrument health monitor for the Loss Cone Imager (LCI) satellite project. GSE mimics the behavior of the onboard Experiment Computer System (ECS). Its functions comprise the measurement of voltage, current, and power, as well as acting as a safety mechanism in case of any anomalous condition (e.g., over-current and/or over-voltage situation). Individual log files record the sessions during which data is gathered and analyzed. Safety/warning alarm flags shall be 'visible' from any individual window/tab. Analog-to-Digital Conversion (ADC) particle group measurements will be displayed on six individual panels. GSE will be supplemented with a comprehensive user's manual for added clarity.
Foundations for Protecting Renewable-Rich Distribution Systems.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ellis, Abraham; Brahma, Sukumar; Ranade, Satish
High proliferation of Inverter Interfaced Distributed Energy Resources (IIDERs) into the electric distribution grid introduces new challenges to protection of such systems. This is because the existing protection systems are designed with two assumptions: 1) system is single-sourced, resulting in unidirectional fault current, and (2) fault currents are easily detectable due to much higher magnitudes compared to load currents. Due to the fact that most renewables interface with the grid though inverters, and inverters restrict their current output to levels close to the full load currents, both these assumptions are no longer valid - the system becomes multi-sourced, and overcurrent-basedmore » protection does not work. The primary scope of this study is to analyze the response of a grid-tied inverter to different faults in the grid, leading to new guidelines on protecting renewable-rich distribution systems.« less
Quench Detection and Protection of an HTS Coil
NASA Astrophysics Data System (ADS)
Sheehan, Evan; Pfotenhauer, John; Miller, Franklin; Christianson, Owen
2017-12-01
A pulsed, modular HTS magnet for energy storage applications was constructed and tested. Charge and discharge pulses were accomplished in about 1 second. A recuperative cryogenic cooling system supplies 42 to 80 Kelvin helium gas to the magnet. A practical solution to overvoltage and overcurrent protection has been implemented digitally using LabVIEW. Voltages as little as 46 μV greater than the expected value trigger the protection system, which stops the pulse profile and begins an immediate current ramp down to zero over 1 second. The protection system has displayed its effectiveness in HTS transition detection and damage prevention. Experimentation has demonstrated that current pulses on the order of seconds with amplitudes of up to 110 Amps can be achieved for extended periods. Higher currents produce joint heating in excess of the available cooling from the existing cryogenic system.
NASA Technical Reports Server (NTRS)
Bennett, William R.; Baldwin, Richard S.
2010-01-01
The NASA Glenn Research Center (GRC) Electrochemistry Branch designed and built five lithium-ion battery packs for demonstration in spacesuit simulators as a part of the 2007 Desert Research and Technology Studies (D-RATS) activity at Cinder Lake, Arizona. The experimental batteries incorporated advanced, NASA-developed electrolytes and included internal protection against over-current, overdischarge and over-temperature. The 500-g experimental batteries were designed to deliver a constant power of 22 W for 2.5 hr with a minimum voltage of 13 V. When discharged at the maximum expected power output of 38.5 W, the batteries operated for 103 min of discharge time, achieving a specific energy of 130 Wh/kg. This report summarizes design details and safety considerations. Results for field trials and laboratory testing are summarized.
SiC MOSFET Switching Power Amplifier Project Summary
NASA Astrophysics Data System (ADS)
Miller, Kenneth E.; Ziemba, Timothy; Prager, James; Slobodov, Ilia; Henson, Alex
2017-10-01
Eagle Harbor Technologies has completed a Phase I/II program to develop SiC MOSFET based Switching Power Amplifiers (SPA) for precision magnet control in fusion science applications. During this program, EHT developed several units have been delivered to the Helicity Injected Torus (HIT) experiment at the University of Washington to drive both the voltage and flux circuits of the helicity injectors. These units are capable of switching 700 V at 100 kHz with an adjustable duty cycle from 10 - 90% and a combined total output current of 96 kA for 4 ms (at max current). The SPAs switching is controlled by the microcontroller at HIT, which adjusts the duty cycle to maintain a specific waveform in the injector. The SPAs include overcurrent and shoot-through protection circuity. EHT will present an overview of the program including final results for the SPA waveforms. With support of DOE SBIR.
Multiplicities and thermal runaway of current leads for superconducting magnets
NASA Astrophysics Data System (ADS)
Krikkis, Rizos N.
2017-04-01
The multiple solutions of conduction and vapor cooled copper leads modeling current delivery to a superconducting magnet have been numerically calculated. Both ideal convection and convection with a finite heat transfer coefficient for an imposed coolant mass flow rate have been considered. Because of the nonlinearities introduced by the temperature dependent material properties, two solutions exist, one stable and one unstable regardless of the cooling method. The limit points separating the stable form the unstable steady states form the blow-up threshold beyond which, any further increase in the operating current results in a thermal runway. An interesting finding is that the multiplicity persists even when the cold end temperature is raised above the liquid nitrogen temperature. The effect of various parameters such as the residual resistivity ratio, the overcurrent and the variable conductor cross section on the bifurcation structure and their stabilization effect on the blow-up threshold is also evaluated.
A Hybrid On-line Verification Method of Relay Setting
NASA Astrophysics Data System (ADS)
Gao, Wangyuan; Chen, Qing; Si, Ji; Huang, Xin
2017-05-01
Along with the rapid development of the power industry, grid structure gets more sophisticated. The validity and rationality of protective relaying are vital to the security of power systems. To increase the security of power systems, it is essential to verify the setting values of relays online. Traditional verification methods mainly include the comparison of protection range and the comparison of calculated setting value. To realize on-line verification, the verifying speed is the key. The verifying result of comparing protection range is accurate, but the computation burden is heavy, and the verifying speed is slow. Comparing calculated setting value is much faster, but the verifying result is conservative and inaccurate. Taking the overcurrent protection as example, this paper analyses the advantages and disadvantages of the two traditional methods above, and proposes a hybrid method of on-line verification which synthesizes the advantages of the two traditional methods. This hybrid method can meet the requirements of accurate on-line verification.
Design and Performance Analysis of an Intrinsically Safe Ultrasonic Ranging Sensor
Zhang, Hongjuan; Wang, Yu; Zhang, Xu; Wang, Dong; Jin, Baoquan
2016-01-01
In flammable or explosive environments, an ultrasonic sensor for distance measurement poses an important engineering safety challenge, because the driving circuit uses an intermediate frequency transformer as an impedance transformation element, in which the produced heat or spark is available for ignition. In this paper, an intrinsically safe ultrasonic ranging sensor is designed and implemented. The waterproof piezoelectric transducer with integrated transceiver is chosen as an energy transducing element. Then a novel transducer driving circuit is designed based on an impedance matching method considering safety spark parameters to replace an intermediate frequency transformer. Then, an energy limiting circuit is developed to achieve dual levels of over-voltage and over-current protection. The detail calculation and evaluation are executed and the electrical characteristics are analyzed to verify the intrinsic safety of the driving circuit. Finally, an experimental platform of the ultrasonic ranging sensor system is constructed, which involves short-circuit protection. Experimental results show that the proposed ultrasonic ranging sensor is excellent in both ranging performance and intrinsic safety. PMID:27304958
Design and Performance Analysis of an Intrinsically Safe Ultrasonic Ranging Sensor.
Zhang, Hongjuan; Wang, Yu; Zhang, Xu; Wang, Dong; Jin, Baoquan
2016-06-13
In flammable or explosive environments, an ultrasonic sensor for distance measurement poses an important engineering safety challenge, because the driving circuit uses an intermediate frequency transformer as an impedance transformation element, in which the produced heat or spark is available for ignition. In this paper, an intrinsically safe ultrasonic ranging sensor is designed and implemented. The waterproof piezoelectric transducer with integrated transceiver is chosen as an energy transducing element. Then a novel transducer driving circuit is designed based on an impedance matching method considering safety spark parameters to replace an intermediate frequency transformer. Then, an energy limiting circuit is developed to achieve dual levels of over-voltage and over-current protection. The detail calculation and evaluation are executed and the electrical characteristics are analyzed to verify the intrinsic safety of the driving circuit. Finally, an experimental platform of the ultrasonic ranging sensor system is constructed, which involves short-circuit protection. Experimental results show that the proposed ultrasonic ranging sensor is excellent in both ranging performance and intrinsic safety.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhukov, A. V.; Komarov, A. N.; Safronov, A. N.
The principles of central control of the power generating units of thermal power plants by automatic secondary frequency and active power overcurrent regulation systems, and the algorithms for interactions between automatic power control systems for the power production units in thermal power plants and centralized systems for automatic frequency and power regulation, are discussed. The order of switching the power generating units of thermal power plants over to control by a centralized system for automatic frequency and power regulation and by the Central Coordinating System for automatic frequency and power regulation is presented. The results of full-scale system tests ofmore » the control of power generating units of the Kirishskaya, Stavropol, and Perm GRES (State Regional Electric Power Plants) by the Central Coordinating System for automatic frequency and power regulation at the United Power System of Russia on September 23-25, 2008, are reported.« less
NASA Astrophysics Data System (ADS)
Sima, Wenxia; Zou, Mi; Yang, Ming; Yang, Qing; Peng, Daixiao
2018-05-01
Amorphous alloy is increasingly widely used in the iron core of power transformer due to its excellent low loss performance. However, its potential harm to the power system is not fully studied during the electromagnetic transients of the transformer. This study develops a simulation model to analyze the effect of transformer iron core materials on ferroresonance. The model is based on the transformer π equivalent circuit. The flux linkage-current (ψ-i) Jiles-Atherton reactor is developed in an Electromagnetic Transients Program-Alternative Transients Program and is used to represent the magnetizing branches of the transformer model. Two ferroresonance cases are studied to compare the performance of grain-oriented Si-steel and amorphous alloy cores. The ferroresonance overvoltage and overcurrent are discussed under different system parameters. Results show that amorphous alloy transformer generates higher voltage and current than those of grain-oriented Si-steel transformer and significantly harms the power system safety.
Research on Fault Characteristics and Line Protections Within a Large-scale Photovoltaic Power Plant
NASA Astrophysics Data System (ADS)
Zhang, Chi; Zeng, Jie; Zhao, Wei; Zhong, Guobin; Xu, Qi; Luo, Pandian; Gu, Chenjie; Liu, Bohan
2017-05-01
Centralized photovoltaic (PV) systems have different fault characteristics from distributed PV systems due to the different system structures and controls. This makes the fault analysis and protection methods used in distribution networks with distributed PV not suitable for a centralized PV power plant. Therefore, a consolidated expression for the fault current within a PV power plant under different controls was calculated considering the fault response of the PV array. Then, supported by the fault current analysis and the on-site testing data, the overcurrent relay (OCR) performance was evaluated in the collection system of an 850 MW PV power plant. It reveals that the OCRs at downstream side on overhead lines may malfunction. In this case, a new relay scheme was proposed using directional distance elements. In the PSCAD/EMTDC, a detailed PV system model was built and verified using the on-site testing data. Simulation results indicate that the proposed relay scheme could effectively solve the problems under variant fault scenarios and PV plant output levels.
NASA Technical Reports Server (NTRS)
Baker, D. E.
1975-01-01
The first generation of remote power controllers (RPC) developed included: a 5-ampere design (Type 1), capable of limiting maximum overload current to 15 amperes for .1 sec; and 5-ampere noncurrent (Type 2) and 30-ampere noncurrent (Type 3) limiting designs, both with selectable instant trip levels for high-current overload. Each design provides overcurrent protection through an inverse I squared T trip-out function with an automatic reset option and demonstrates step-applied fault capability with a 4000-ampere surge, fast-risetime (low-inductance) power source. They also meet MIL - STD - 461A specification for electromagnetic interference. The second generation RPCs traded off specification compliance for reduction in cost and complexity for the Type 1 and 2 designs and give comparable or improved performance in most areas. The noncurrent limiting RPC proved to be a more economical and feasible method of overload protection for certain load types.
NASA Astrophysics Data System (ADS)
Patcharoen, Theerasak; Yoomak, Suntiti; Ngaopitakkul, Atthapol; Pothisarn, Chaichan
2018-04-01
This paper describes the combination of discrete wavelet transforms (DWT) and artificial intelligence (AI), which are efficient techniques to identify the type of inrush current, analyze the origin and possible cause on the capacitor bank switching. The experiment setup used to verify the proposed techniques can be detected and classified the transient inrush current from normal capacitor rated current. The discrete wavelet transforms are used to detect and classify the inrush current. Then, output from wavelet is acted as input of fuzzy inference system for discriminating the type of switching transient inrush current. The proposed technique shows enhanced performance with a discrimination accuracy of 90.57%. Both simulation study and experimental results are quite satisfactory with providing the high accuracy and reliability which can be developed and implemented into a numerical overcurrent (50/51) and unbalanced current (60C) protection relay for an application of shunt capacitor bank protection in the future.
An In-Rush Current Suppression Technique for the Solid-State Transfer Switch System
NASA Astrophysics Data System (ADS)
Cheng, Po-Tai; Chen, Yu-Hsing
More and more utility companies provide dual power feeders as a premier service of high power quality and reliability. To take advantage of this, the solid-state transfer switch (STS) is adopted to protect the sensitive load against the voltage sag. However, the fast transfer process may cause in-rush current on the load-side transformer due to the resulting DC-offset in its magnetic flux as the load-transfer is completed. The in-rush current can reach 2∼6 p.u. and it may trigger the over-current protections on the power feeder. This paper develops a flux estimation scheme and a thyristor gating scheme based on the impulse commutation bridge STS (ICBSTS) to minimize the DC-offset on the magnetic flux. By sensing the line voltages of both feeders, the flux estimator can predict the peak transient flux linkage at the moment of load-transfer and evaluate a suitable moment for the transfer to minimize the in-rush current. Laboratory test results are presented to validate the performance of the proposed system.
The BepiColombo Laser Altimeter (BeLA) power converter module (PCM): Concept and characterisation.
Rodrigo, J; Gasquet, E; Castro, J-M; Herranz, M; Lara, L-M; Muñoz, M; Simon, A; Behnke, T; Thomas, N
2017-03-01
This paper presents the principal considerations when designing DC-DC converters for space instruments, in particular for the power converter module as part of the first European space laser altimeter: "BepiColombo Laser Altimeter" on board the European Space Agency-Japan Aerospace Exploration Agency (JAXA) mission BepiColombo. The main factors which determine the design of the DC-DC modules in space applications are printed circuit board occupation, mass, DC-DC converter efficiency, and environmental-survivability constraints. Topics included in the appropriated DC-DC converter design flow are hereby described. The topology and technology for the primary and secondary stages, input filters, transformer design, and peripheral components are discussed. Component selection and design trade-offs are described. Grounding, load and line regulation, and secondary protection circuitry (under-voltage, over-voltage, and over-current) are then introduced. Lastly, test results and characterization of the final flight design are also presented. Testing of the inrush current, the regulated output start-up, and the switching function of the power supply indicate that these performances are fully compliant with the requirements.
Space station electrical power distribution analysis using a load flow approach
NASA Technical Reports Server (NTRS)
Emanuel, Ervin M.
1987-01-01
The space station's electrical power system will evolve and grow in a manner much similar to the present terrestrial electrical power system utilities. The initial baseline reference configuration will contain more than 50 nodes or busses, inverters, transformers, overcurrent protection devices, distribution lines, solar arrays, and/or solar dynamic power generating sources. The system is designed to manage and distribute 75 KW of power single phase or three phase at 20 KHz, and grow to a level of 300 KW steady state, and must be capable of operating at a peak of 450 KW for 5 to 10 min. In order to plan far into the future and keep pace with load growth, a load flow power system analysis approach must be developed and utilized. This method is a well known energy assessment and management tool that is widely used throughout the Electrical Power Utility Industry. The results of a comprehensive evaluation and assessment of an Electrical Distribution System Analysis Program (EDSA) is discussed. Its potential use as an analysis and design tool for the 20 KHz space station electrical power system is addressed.
Advanced Protection & Service Restoration for FREEDM Systems
NASA Astrophysics Data System (ADS)
Singh, Urvir
A smart electric power distribution system (FREEDM system) that incorporates DERs (Distributed Energy Resources), SSTs (Solid State Transformers - that can limit the fault current to two times of the rated current) & RSC (Reliable & Secure Communication) capabilities has been studied in this work in order to develop its appropriate protection & service restoration techniques. First, a solution is proposed that can make conventional protective devices be able to provide effective protection for FREEDM systems. Results show that although this scheme can provide required protection but it can be quite slow. Using the FREEDM system's communication capabilities, a communication assisted Overcurrent (O/C) protection scheme is proposed & results show that by using communication (blocking signals) very fast operating times are achieved thereby, mitigating the problem of conventional O/C scheme. Using the FREEDM System's DGI (Distributed Grid Intelligence) capability, an automated FLISR (Fault Location, Isolation & Service Restoration) scheme is proposed that is based on the concept of 'software agents' & uses lesser data (than conventional centralized approaches). Test results illustrated that this scheme is able to provide a global optimal system reconfiguration for service restoration.
Compact, Intelligent, Digitally Controlled IGBT Gate Drivers for a PEBB-Based ILC Marx Modulator
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nguyen, M.N.; Burkhart, C.; Olsen, J.J.
2010-06-07
SLAC National Accelerator Laboratory has built and is currently operating a first generation prototype Marx klystron modulator to meet ILC specifications. Under development is a second generation prototype, aimed at improving overall performance, serviceability, and manufacturability as compared to its predecessor. It is designed around 32 cells, each operating at 3.75 kV and correcting for its own capacitor droop. Due to the uniqueness of this application, high voltage gate drivers needed to be developed for the main 6.5 kV and droop correction 1.7 kV IGBTs. The gate driver provides vital functions such as protection of the IGBT from over-voltage andmore » over-current, detection of gate-emitter open and short circuit conditions, and monitoring of IGBT degradation (based on collector-emitter saturation voltage). Gate drive control, diagnostic processing capabilities, and communication are digitally implemented using an FPGA. This paper details the design of the gate driver circuitry, component selection, and construction layout. In addition, experimental results are included to illustrate the effectiveness of the protection circuit.« less
Determining the Impact of Steady-State PV Fault Current Injections on Distribution Protection
DOE Office of Scientific and Technical Information (OSTI.GOV)
Seuss, John; Reno, Matthew J.; Broderick, Robert Joseph
This report investigates the fault current contribution from a single large PV system and the impact it has on existing distribution overcurrent protection devices. Assumptions are made about the modeling of the PV system under fault to perform exhaustive steady - state fault analyses throughout distribution feeder models. Each PV interconnection location is tested to determine how the size of the PV system affects the fault current measured by each protection device. This data is then searched for logical conditions that indicate whether a protection device has operated in a manner that will cause more customer outages due to themore » addition of the PV system. This is referred to as a protection issue , and there are four unique types of issues that have been identified in the study. The PV system size at which any issues occur are recorded to determine the feeder's PV hosting capacity limitations due to interference with protection settings. The analysis is carried out on six feeder models. The report concludes with a discussion of the prevalence and cause of each protection issue caused by PV system fault current.« less
A new multipurpose CO2 laser therapy instrument.
Peng, X
1995-02-01
A new multipurpose CO2 laser therapy instrument has been developed. It is a highly efficient medical instrument. By use of high laser power density to coagulate, evaporate, and cut body tissue on the nidus, the operation can be controlled and has obvious curative effects. Unlike other kinds of CO2 laser therapy instruments, this device has an advanced switching power supply (SPS) and red guiding light system. With an overcurrent protective device, an overvoltage protective device, and a high-voltage shield device, it provides efficiency, stability, reliability, and low loss. The plastic casing does not leak electricity and the film switches are designed for clinical practice convenience. Additionally, the laser power is numerically displayed and can be set prior to the procedure. The distinct visible guiding light of the laser output makes the operation more convenient and accurate. Because of this unique design and properties, it is a leading model in China. The instrument can be widely used for surgery, gynecology, dermatology, and otolaryngology. The radiation therapy of low laser power density has the effect of being antiinflamatory, analgesic, and antipruritic, and promotes cure of the epithelium. Moreover, it is effective to treat all sorts of sprains, scapulohumeral periarthritis, arthritis, sciatica, and surface ulcers.
NASA Technical Reports Server (NTRS)
Ludwig, Kimberly; Mackin, Michael; Wright, Theodore
1991-01-01
The authors describe the Ada language software developed to perform the electrical power system monitoring functions for the NASA Lewis Research Center's Power Management and Distribution (PMAD) DC testbed. The results of the effort to implement this monitor are presented. The PMAD DC testbed is a reduced-scale prototype of the electric power system to be used in Space Station Freedom. The power is controlled by smart switches known as power control components (or switchgear). The power control components are currently coordinated by five Compaq 386/20e computers connected through an 802.4 local area network. The power system monitor algorithm comprises several functions, including periodic data acquisition, data smoothing, system performance analysis, and status reporting. Data are collected from the switchgear sensors every 100 ms, then passed through a 2-Hz digital filter. System performance analysis includes power interruption and overcurrent detection. The system monitor required a hardware timer interrupt to activate the data acquisition function. The execution time of the code was optimized by using an assembly language routine. The routine allows direct vectoring of the processor to Ada language procedures that perform periodic control activities.
NASA Astrophysics Data System (ADS)
Carniti, P.; Cassina, L.; Gotti, C.; Maino, M.; Pessina, G.
2016-07-01
In this work we present ALDO, an adjustable low drop-out linear regulator designed in AMS 0.35 μm CMOS technology. It is specifically tailored for use in the upgraded LHCb RICH detector in order to improve the power supply noise for the front end readout chip (CLARO). ALDO is designed with radiation-tolerant solutions such as an all-MOS band-gap voltage reference and layout techniques aiming to make it able to operate in harsh environments like High Energy Physics accelerators. It is capable of driving up to 200 mA while keeping an adequate power supply filtering capability in a very wide frequency range from 10 Hz up to 100 MHz. This property allows us to suppress the noise and high frequency spikes that could be generated by a DC/DC regulator, for example. ALDO also shows a very low noise of 11.6 μV RMS in the same frequency range. Its output is protected with over-current and short detection circuits for a safe integration in tightly packed environments. Design solutions and measurements of the first prototype are presented.
NASA Astrophysics Data System (ADS)
Meskin, Matin
The rate of the integration of distributed generation (DG) units to the distribution level to meet the growth in demand increases as a reasonable replacement for costly network expansion. This integration brings many advantages to the consumers and power grids, as well as giving rise to more challenges in relation to protection and control. Recent research has brought to light the negative effects of DG units on short circuit currents and overcurrent (OC) protection systems in distribution networks. Change in the direction of fault current flow, increment or decrement of fault current magnitude, blindness of protection, feeder sympathy trip, nuisance trip of interrupting devices, and the disruption of coordination between protective devices are some potential impacts of DG unit integration. Among other types of DG units, the integration of renewable energy resources into the electric grid has seen a vast improvement in recent years. In particular, the interconnection of photovoltaic (PV) sources to the medium voltage (MV) distribution networks has experienced a rapid increase in the last decade. In this work, the effect of PV source on conventional OC relays in MV distribution networks is shown. It is indicated that the PV output fluctuation, due to changes in solar radiation, causes the magnitude and direction of the current to change haphazardly. These variations may result in the poor operation of OC relays as the main protective devices in the MV distribution networks. In other words, due to the bi-directional power flow characteristic and the fluctuation of current magnitude occurring in the presence of PV sources, a specific setting of OC relays is difficult to realize. Therefore, OC relays may operate in normal conditions. To improve the OC relay operation, a voltage-dependent-overcurrent protection is proposed. Although, this new method prevents the OC relay from maloperation, its ability to detect earth faults and high impedance faults is poor. Thus, a comprehensive protective system is suggested at the end of the dissertation. The proposed method is based on the application of the phasor measurement unit (PMU) and the differential protection method. All of the current magnitudes and angles are collected by PMU and are sent to the phasor data concentrator (PDC), where a differential protection algorithm is applied to these data. If any fault is detected, the trip will be sent back to the corresponding circuit breakers across the network. Higher selectivity, sensitivity, and faster operation in the differential protection are superior to those of other protection schemes. Differential protection operates as unit protection, which means that it operates only when there is a fault in the protection zone. It does not function for faults occurring out of zone. Therefore, no coordination is required between differential protections across the power system. Moreover, the misoperation of this protective scheme is less likely as compared to other protection methods.
Integration & Validation of LCU with Different Sub-systems for Diacrode based amplifier
NASA Astrophysics Data System (ADS)
Rajnish, Kumar; Verma, Sriprakash; Soni, Dipal; Patel, Hriday; Suthar, Gajendra; Dalicha, Hrushikesh; Dhola, Hitesh; Patel, Amit; Upadhayay, Dishang; Jha, Akhil; Patel, Manoj; Trivedi, Rajesh; Machchhar, Harsha; Singh, Raghuraj; Mukherjee, Aparajita
2017-04-01
ITER-India is responsible to deliver nine (8+1 spare) ICH & CD Power Sources to ITER. Each power source is capable to deliver 2.5 MW at 35 to 65 MHz frequency range with a load condition up to VSWR 2:1. For remote operation of different subsystems, Local Control Unit (LCU) is developed. LCU is developed using PXI hardware and Schneider PLC with Lab VIEW-RT developmental environment. All the protection function of the amplifier is running on PXI 7841 R module that ensures hard wired protection logic. There are three level of protection function- first by power supply itself that detects overcurrent/overvoltage and trips itself and generate trip signal for further action. There are some direct hardwired signal interfaces between power supplies to protect the amplifier. Second level of protection is generated through integrated controller of amplifier i.e. Command Control Embedded (CCE) against arc and Anode over current. Third level of Protection is through LCU where different fault signals are received and processed to generate off command for different sub-systems. Before connecting different subsystem with High power RF amplifiers (Driver & Final stage), each subsystem is individually tested through LCU. All protection functions are tested before hooking up the subsystems with main amplifier and initiating RF operation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Habib, Hany F; Lashway, Christopher R; Mohammed, Osama A
One main challenge in the practical implementation of a microgrid is the design of an adequate protection scheme in both grid connected and islanded modes. Conventional overcurrent protection schemes face selectivity and sensitivity issues during grid and microgrid faults since the fault current level is different in both cases for the same relay. Various approaches have been implemented in the past to deal with this problem, yet the most promising ones are the implementation of adaptive protection techniques abiding by the IEC 61850 communication standard. This paper presents a critical review of existing adaptive protection schemes, the technical challenges formore » the use of classical protection techniques and the need for an adaptive, smart protection system. However, the risk of communication link failures and cyber security threats still remain a challenge in implementing a reliable adaptive protection scheme. A contingency is needed where a communication issue prevents the relay from adjusting to a lower current level during islanded mode. An adaptive protection scheme is proposed that utilizes energy storage (ES) and hybrid ES (HESS) already available in the network as a mechanism to source the higher fault current. Four common grid ES and HESS are reviewed for their suitability in feeding the fault while some solutions are proposed.« less
Experiments and Simulations of ITER-like Plasmas in Alcator C-Mod
DOE Office of Scientific and Technical Information (OSTI.GOV)
.R. Wilson, C.E. Kessel, S. Wolfe, I.H. Hutchinson, P. Bonoli, C. Fiore, A.E. Hubbard, J. Hughes, Y. Lin, Y. Ma, D. Mikkelsen, M. Reinke, S. Scott, A.C.C. Sips, S. Wukitch and the C-Mod Team
Alcator C-Mod is performing ITER-like experiments to benchmark and verify projections to 15 MA ELMy H-mode Inductive ITER discharges. The main focus has been on the transient ramp phases. The plasma current in C-Mod is 1.3 MA and toroidal field is 5.4 T. Both Ohmic and ion cyclotron (ICRF) heated discharges are examined. Plasma current rampup experiments have demonstrated that (ICRF and LH) heating in the rise phase can save voltseconds (V-s), as was predicted for ITER by simulations, but showed that the ICRF had no effect on the current profile versus Ohmic discharges. Rampdown experiments show an overcurrent inmore » the Ohmic coil (OH) at the H to L transition, which can be mitigated by remaining in H-mode into the rampdown. Experiments have shown that when the EDA H-mode is preserved well into the rampdown phase, the density and temperature pedestal heights decrease during the plasma current rampdown. Simulations of the full C-Mod discharges have been done with the Tokamak Simulation Code (TSC) and the Coppi-Tang energy transport model is used with modified settings to provide the best fit to the experimental electron temperature profile. Other transport models have been examined also. __________________________________________________« less
NASA Astrophysics Data System (ADS)
Rama Subbanna, S.; Suryakalavathi, M., Dr.
2017-08-01
This paper is an attempt to accomplish a performance analysis of the different control techniques on spikes reduction method applied on the medium frequency transformer based DC spot welding system. Spike reduction is an important factor to be considered while spot welding systems are concerned. During normal RSWS operation welding transformer’s magnetic core can become saturated due to the unbalanced resistances of both transformer secondary windings and different characteristics of output rectifier diodes, which causes current spikes and over-current protection switch-off of the entire system. The current control technique is a piecewise linear control technique that is inspired from the DC-DC converter control algorithms to register a novel spike reduction method in the MFDC spot welding applications. Two controllers that were used for the spike reduction portion of the overall applications involve the traditional PI controller and Optimized PI controller. Care is taken such that the current control technique would maintain a reduced spikes in the primary current of the transformer while it reduces the Total Harmonic Distortion. The performance parameter that is involved in the spikes reduction technique is the THD, Percentage of current spike reduction for both techniques. Matlab/SimulinkTM based simulation is carried out for the MFDC RSWS with KW and results are tabulated for the PI and Optimized PI controllers and a tradeoff analysis is carried out.
Research of performance prediction to energy on hydraulic turbine
NASA Astrophysics Data System (ADS)
Quan, H.; Li, R. N.; Li, Q. F.; Han, W.; Su, Q. M.
2012-11-01
Refer to the low specific speed Francis turbine blade design principle and double-suction pump structure. Then, design a horizontal double-channel hydraulic turbine Francis. Through adding different guide vane airfoil and and no guide vane airfoil on the hydraulic conductivity components to predict hydraulic turbine energy and using Fluent software to numerical simulation that the operating conditions and point. The results show that the blade pressure surface and suction surface pressure is low when the hydraulic turbine installation is added standard positive curvature of the guide vane and modified positive curvature of guide vane. Therefore, the efficiency of energy recovery is low. However, the pressure of negative curvature guide vane and symmetric guide vane added on hydraulic turbine installations is larger than that of the former ones, and it is conducive to working of runner. With the decreasing of guide vane opening, increasing of inlet angle, flow state gets significantly worse. Then, others obvious phenomena are that the reflux and horizontal flow appeared in blade pressure surface. At the same time, the vortex was formed in Leaf Road, leading to the loss of energy. Through analyzing the distribution of pressure, velocity, flow lines of over-current flow in the the back hydraulic conductivity components in above programs we can known that the hydraulic turbine installation added guide vane is more reasonable than without guide vanes, it is conducive to improve efficiency of energy conversion.
Skin antiseptics and the risk of operating theatre fires.
Spigelman, Allan D; Swan, Judith R
2005-07-01
Following press reports of patients catching fire or receiving chemical burns in the operating theatre, a review was conducted on the flammability of skin antiseptics. The purpose of the paper was to clarify confusion regarding povidine-iodine (Betadine), which had been reported as being flammable, and also to determine the use of alcohol-based solutions in the Hunter Area Health Service. A risk assessment was conducted and risk reduction strategies outlined. Risk assessment was made following a literature review and an audit of 10 operating theatres in the Hunter Area Health Service. Risk for operating room fires from alcohol-based skin antiseptics was confirmed. Antiseptics in aqueous solutions only smoulder. The Hunter Health survey indicated that although alcohol-based solutions were not used in operating theatres, they were used in anaesthetic bays for insertion of epidural and central line catheters. Strategies to reduce the risk of fire include discontinuation of use of alcohol-based skin antiseptics in operating theatres; using fire retardant surgical drapes; installing over-current protection devices on electrical equipment; minimizing flammable conditions by avoiding nitrous oxide and using the lowest required concentration of inspired oxygen; use of non-flammable cuffed endotracheal tubes; education and training of operating theatre personnel in fire hazards. Operating theatre fires continue to be a major risk for patient safety. In order to reduce this risk, the strategies outlined here should be followed.
Mousa, Mohamed G; Allam, S M; Rashad, Essam M
2018-01-01
This paper proposes an advanced strategy to synchronize the wind-driven Brushless Doubly-Fed Reluctance Generator (BDFRG) to the grid-side terminals. The proposed strategy depends mainly upon determining the electrical angle of the grid voltage, θ v and using the same transformation matrix of both the power winding and grid sides to ensure that the generated power-winding voltage has the same phase-sequence of the grid-side voltage. On the other hand, the paper proposes a vector-control (power-winding flux orientation) technique for maximum wind-power extraction under two schemes summarized as; unity power-factor operation and minimum converter-current. Moreover, a soft-starting method is suggested to avoid the employed converter over-current. The first control scheme is achieved by adjusting the command power-winding reactive power at zero for a unity power-factor operation. However, the second scheme depends on setting the command d-axis control-winding current at zero to maximize the ratio of the generator electromagnetic-torque per the converter current. This enables the system to get a certain command torque under minimum converter current. A sample of the obtained simulation and experimental results is presented to check the effectiveness of the proposed control strategies. Copyright © 2017 ISA. Published by Elsevier Ltd. All rights reserved.
Commissioning of two RF operation modes for RF negative ion source experimental setup at HUST
NASA Astrophysics Data System (ADS)
Li, D.; Chen, D.; Liu, K.; Zhao, P.; Zuo, C.; Wang, X.; Wang, H.; Zhang, L.
2017-08-01
An RF-driven negative ion source experimental setup, without a cesium oven and an extraction system, has been built at Huazhong University of Science and Technology (HUST). The working gas is hydrogen, and the typical operational gas pressure is 0.3 Pa. The RF generator is capable of delivering up to 20 kW at 0.9 - 1.1 MHz, and has two operation modes, the fixed-frequency mode and auto-tuning mode. In the fixed-frequency mode, it outputs a steady RF forward power (Pf) at a fixed frequency. In the auto-tuning mode, it adjusts the operating frequency to seek and track the minimum standing wave ratio (SWR) during plasma discharge. To achieve fast frequency tuning, the RF signal source adopts a direct digital synthesizer (DDS). To withstand high SWR during the discharge, a tetrode amplifier is chosen as the final stage amplifier. The trend of maximum power reflection coefficient |ρ|2 at plasma ignition is presented at the fixed frequency of 1.02 MHz with the Pf increasing from 5 kW to 20 kW, which shows the maximum |ρ|2 tends to be "steady" under high RF power. The experiments in auto-tuning mode fail due to over-current protection of screen grid. The possible reason is the relatively large equivalent anode impedance caused by the frequency tuning. The corresponding analysis and possible solution are presented.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sarrao, J.; Kwok, W-K; Bozovic, I.
As an energy carrier, electricity has no rival with regard to its environmental cleanliness, flexibility in interfacing with multiple production sources and end uses, and efficiency of delivery. In fact, the electric power grid was named ?the greatest engineering achievement of the 20th century? by the National Academy of Engineering. This grid, a technological marvel ingeniously knitted together from local networks growing out from cities and rural centers, may be the biggest and most complex artificial system ever built. However, the growing demand for electricity will soon challenge the grid beyond its capability, compromising its reliability through voltage fluctuations thatmore » crash digital electronics, brownouts that disable industrial processes and harm electrical equipment, and power failures like the North American blackout in 2003 and subsequent blackouts in London, Scandinavia, and Italy in the same year. The North American blackout affected 50 million people and caused approximately $6 billion in economic damage over the four days of its duration. Superconductivity offers powerful new opportunities for restoring the reliability of the power grid and increasing its capacity and efficiency. Superconductors are capable of carrying current without loss, making the parts of the grid they replace dramatically more efficient. Superconducting wires carry up to five times the current carried by copper wires that have the same cross section, thereby providing ample capacity for future expansion while requiring no increase in the number of overhead access lines or underground conduits. Their use is especially attractive in urban areas, where replacing copper with superconductors in power-saturated underground conduits avoids expensive new underground construction. Superconducting transformers cut the volume, weight, and losses of conventional transformers by a factor of two and do not require the contaminating and flammable transformer oils that violate urban safety codes. Unlike traditional grid technology, superconducting fault current limiters are smart. They increase their resistance abruptly in response to overcurrents from faults in the system, thus limiting the overcurrents and protecting the grid from damage. They react fast in both triggering and automatically resetting after the overload is cleared, providing a new, self-healing feature that enhances grid reliability. Superconducting reactive power regulators further enhance reliability by instantaneously adjusting reactive power for maximum efficiency and stability in a compact and economic package that is easily sited in urban grids. Not only do superconducting motors and generators cut losses, weight, and volume by a factor of two, but they are also much more tolerant of voltage sag, frequency instabilities, and reactive power fluctuations than their conventional counterparts. The challenge facing the electricity grid to provide abundant, reliable power will soon grow to crisis proportions. Continuing urbanization remains the dominant historic demographic trend in the United States and in the world. By 2030, nearly 90% of the U.S. population will reside in cities and suburbs, where increasingly strict permitting requirements preclude bringing in additional overhead access lines, underground cables are saturated, and growth in power demand is highest. The power grid has never faced a challenge so great or so critical to our future productivity, economic growth, and quality of life. Incremental advances in existing grid technology are not capable of solving the urban power bottleneck. Revolutionary new solutions are needed ? the kind that come only from superconductivity.« less
NASA Astrophysics Data System (ADS)
Lachugin, V. F.; Panfilov, D. I.; Akhmetov, I. M.; Astashev, M. G.; Shevelev, A. V.
2014-12-01
Problems of functioning of differential current protection systems of phase shifting devices (PSD) with mechanically changed coefficient of transformation of shunt transformer are analyzed. Requirements for devices of protection of PSD with thyristor switch are formulated. Based on use of nonlinear models of series-wound and shunt transformers of PSD modes of operation of major protection during PSD, switching to zero load operation and to operation under load and during short circuit operation were studied for testing PSD with failures. Use of the principle of duplicating by devices of differential current protection (with realization of functions of breaking) of failures of separate pares of PSD with thyristor switch was substantiated. To ensure protection sensitivity to the shunt transformer winding short circuit, in particular, to a short circuit that is not implemented in the current differential protection for PSD with mechanical switch, the differential current protection reacting to the amount of primary ampere-turns of high-voltage and low-voltage winding of this transformer was designed. Studies have shown that the use of differential current cutoff instead of overcurrent protection for the shunt transformer wndings allows one to provide the sensitivity during thyristor failure with the formation of a short circuit. The results of simulation mode for the PSD with switch thyristor designed to be installed as switching point of Voskhod-Tatarskaya-Barabinsk 220 kV transmission line point out the efficiency of the developed solutions that ensure reliable functioning of the PSD.
THE FAULT DIVERTER-A PROTECTIVE DEVICE FOR HIGH-POWER ELECTRON TUBES
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, B.H.
1957-08-01
Fault diverters, or crowbars, have proven to be very effective protection against transient-induced power arcs within accelerator oscillator tubes. This device short circuits the oscillator-plate power supply in the event of an over-current, thus removing the power flow from the fault within a few microseconds. Ignitrons, thyratrons, and triggered spark gaps are used for this purpose. The power supply is protected from the short circuit either by a current-limiting device or a high-speed contactor which removes the system from the power lines within a few milliseconds. The fault diverters, and associated circuitry, used on several of the accelerators in Berkeleymore » and Livermore are described. (auth) l73O Studies of pi -meson and K-meson interactions were continued with counters, emulsions, and the 10-inch liquid hydrogen bubble chanmber. Six emulsion exposures were made for external groups to a pi -meson beam, three to Kmeson beams, two to a neutral-particle beanm, and three to the internal proton beam. An H-D reaction, catalyzed by mu mesons, was observed in the 10-inch liquid hydrogen bubble chamber. Absorption cross-section measurements for antiprotons were continued, using counters. Nineteen target bombardments were made for the chemistry group. A technique of producing two or more secondary-particle beam pulses per acceleration cycle, using different targets, has been successfully tried and used. (For preceding period see UCRL- 36l4.1 (auth)« less
NASA Astrophysics Data System (ADS)
Yim, S.-W.; Yu, S.-D.; Kim, H.-R.; Kim, M.-J.; Park, C.-R.; Yang, S.-E.; Kim, W.-S.; Hyun, O.-B.; Sim, J.; Park, K.-B.; Oh, I.-S.
2010-11-01
We have constructed and completed the preparation for a long-term operation test of a superconducting fault current limiter (SFCL) in a Korea Electric Power Corporation (KEPCO) test grid. The SFCL with rating of 22.9 kV/630 A, 3-phases, has been connected to the 22.9 kV test grid equipped with reclosers and other protection devices in Gochang Power Testing Center of KEPCO. The main goals of the test are the verification of SFCL performance and protection coordination studies. A line-commutation type SFCL was fabricated and installed for this project, and the superconducting components were cooled by a cryo-cooler to 77 K in the sub-cooled liquid nitrogen pressurized by 3 bar of helium gas. The verification test includes un-manned - long-term operation with and without loads and fault tests. Since the test site is 170 km away from the laboratory, we will adopt the un-manned operation with real-time remote monitoring and controlling using high speed internet. For the fault tests, we will apply fault currents up to around 8 kArms to the SFCL using an artificial fault generator. The fault tests may allow us not only to confirm the current limiting capability of the SFCL, but also to adjust the SFCL - recloser coordination such as resetting over-current relay parameters. This paper describes the construction of the testing facilities and discusses the plans for the verification tests.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Physical device safety is typically implemented locally using embedded controllers, while operations safety is primarily performed in control centers. Safe operations can be enhanced by correct design of device-level control algorithms, and protocols, procedures and operator training at the control-room level, but all can fail. Moreover, these elements exchange data and issue commands via vulnerable communication layers. In order to secure these gaps and enhance operational safety, we believe monitoring of command sequences must be combined with an awareness of physical device limitations and automata models that capture safety mechanisms. One way of doing this is by leveraging specification-based intrusionmore » detection to monitor for physical constraint violations. The method can also verify that physical infrastructure state is consistent with monitoring information and control commands exchanged between field devices and control centers. This additional security layer enhances protection from both outsider attacks and insider mistakes. We implemented specification-based SCADA command analyzers using physical constraint algorithms directly in the Bro framework and Broccoli APIs for three separate scenarios: a water heater, an automated distribution system, and an over-current protection scheme. To accomplish this, we added low-level analyzers capable of examining control system-specific protocol packets for both Modbus TCP and DNP3, and also higher-level analyzers able to interpret device command and data streams within the context of each device's physical capabilities and present operational state. Thus the software that we are making available includes the Bro/Broccoli scripts for these three scenarios, as well as simulators, written in C, of those scenarios that generate sample traffic that is monitored by the Bro/Broccoli scripts. In addition, we have also implemented systems to directly pull cyber-physical information from the OSIsoft PI historian system. We have included the Python scripts used to perform that monitoring.« less
NASA Technical Reports Server (NTRS)
Ludwig, Kimberly; Mackin, Michael; Wright, Theodore
1991-01-01
The Ada language software development to perform the electrical system monitoring functions for the NASA Lewis Research Center's Power Management and Distribution (PMAD) DC testbed is described. The results of the effort to implement this monitor are presented. The PMAD DC testbed is a reduced-scale prototype of the electrical power system to be used in the Space Station Freedom. The power is controlled by smart switches known as power control components (or switchgear). The power control components are currently coordinated by five Compaq 382/20e computers connected through an 802.4 local area network. One of these computers is designated as the control node with the other four acting as subsidiary controllers. The subsidiary controllers are connected to the power control components with a Mil-Std-1553 network. An operator interface is supplied by adding a sixth computer. The power system monitor algorithm is comprised of several functions including: periodic data acquisition, data smoothing, system performance analysis, and status reporting. Data is collected from the switchgear sensors every 100 milliseconds, then passed through a 2 Hz digital filter. System performance analysis includes power interruption and overcurrent detection. The reporting mechanism notifies an operator of any abnormalities in the system. Once per second, the system monitor provides data to the control node for further processing, such as state estimation. The system monitor required a hardware time interrupt to activate the data acquisition function. The execution time of the code was optimized using an assembly language routine. The routine allows direct vectoring of the processor to Ada language procedures that perform periodic control activities. A summary of the advantages and side effects of this technique are discussed.
Application of drive circuit based on L298N in direct current motor speed control system
NASA Astrophysics Data System (ADS)
Yin, Liuliu; Wang, Fang; Han, Sen; Li, Yuchen; Sun, Hao; Lu, Qingjie; Yang, Cheng; Wang, Quanzhao
2016-10-01
In the experiment of researching the nanometer laser interferometer, our design of laser interferometer circuit system is up to the wireless communication technique of the 802.15.4 IEEE standard, and we use the RF TI provided by Basic to receive the data on speed control system software. The system's hardware is connected with control module and the DC motor. However, in the experiment, we found that single chip microcomputer control module is very difficult to drive the DC motor directly. The reason is that the DC motor's starting and braking current is larger than the causing current of the single chip microcomputer control module. In order to solve this problem, we add a driving module that control board can transmit PWM wave signal through I/O port to drive the DC motor, the driving circuit board can come true the function of the DC motor's positive and reversal rotation and speed adjustment. In many various driving module, the L298N module's integrated level is higher compared with other driver module. The L298N model is easy to control, it not only can control the DC motor, but also achieve motor speed control by modulating PWM wave that the control panel output. It also has the over-current protection function, when the motor lock, the L298N model can protect circuit and motor. So we use the driver module based on L298N to drive the DC motor. It is concluded that the L298N driver circuit module plays a very important role in the process of driving the DC motor in the DC motor speed control system.
NLCC controller for SEPIC-based micro-wind energy conversion system
NASA Astrophysics Data System (ADS)
Justin Nayagam, Brintha Jane; Sathi, Rama Reddy; Olimuthu, Divya
2017-04-01
The growth of the power industry is gaining greater momentum as the usage of the non-conventional energy sources that include fuel, solar, and wind energies, increases. Wind energy conversion systems (WECSs) are gaining more popularity and are expected to be able to control the power at the output. This paper describes the current control (CC), non-linear carrier charge control (NLCCC), and fuzzy logic control (FLC) applied to the single-ended primary inductor converter (SEPIC)-based WECS. The current controller has an inherent overcurrent protection with better line noise rejection. The pulses for the switch of the SEPIC are obtained by comparing the current flowing through it with the virtual current reference. FLC is also investigated for the micro-wind energy conversion system (μWECS), since it improves the damping characteristics of WECS over a wide range of operating points. This cannot attain the unity power factor rectification. In this paper, NLCCC is proposed for high-power factor rectifier-based SEPIC in continuous conduction mode (CCM) for μWECS. The proposed converter provides an output voltage with low input current ripple due to the presence of the inductor at the input side. By comparing the signal proportional to the integral of switch current with a periodic non-linear carrier wave, the duty ratio of the converter switch is determined for the NLCC controller. By selecting the shape of the periodic non-linear carrier wave the input-line current can be made to follow the input-line voltage. This work employs a parabolic carrier waveform generator. The output voltage is regulated for changes in the wind speed. The results obtained prove the effectiveness of the NLCC controller in improving the power factor.
Research of high power and stable laser in portable Raman spectrometer based on SHINERS technology
NASA Astrophysics Data System (ADS)
Cui, Yongsheng; Yin, Yu; Wu, Yulin; Ni, Xuxiang; Zhang, Xiuda; Yan, Huimin
2013-08-01
The intensity of Raman light is very weak, which is only from 10-12 to 10-6 of the incident light. In order to obtain the required sensitivity, the traditional Raman spectrometer tends to be heavy weight and large volume, so it is often used as indoor test device. Based on the Shell-Isolated Nanoparticle-Enhanced Raman Spectroscopy (SHINERS) method, Raman optical spectrum signal can be enhanced significantly and the portable Raman spectrometer combined with SHINERS method will be widely used in various fields. The laser source must be stable enough and able to output monochromatic narrow band laser with stable power in the portable Raman spectrometer based on the SHINERS method. When the laser is working, the change of temperature can induce wavelength drift, thus the power stability of excitation light will be affected, so we need to strictly control the working temperature of the laser, In order to ensure the stability of laser power and output current, this paper adopts the WLD3343 laser constant current driver chip of Wavelength Electronics company and MCU P89LPC935 to drive LML - 785.0 BF - XX laser diode(LD). Using this scheme, the Raman spectrometer can be small in size and the drive current can be constant. At the same time, we can achieve functions such as slow start, over-current protection, over-voltage protection, etc. Continuous adjustable output can be realized under control, and the requirement of high power output can be satisfied. Max1968 chip is adopted to realize the accurate control of the laser's temperature. In this way, it can meet the demand of miniaturization. In term of temperature control, integral truncation effect of traditional PID algorithm is big, which is easy to cause static difference. Each output of incremental PID algorithm has nothing to do with the current position, and we can control the output coefficients to avoid full dose output and immoderate adjustment, then the speed of balance will be improved observably. Variable integral incremental digital PID algorithm is used in the TEC temperature control system. The experimental results show that comparing with other schemes, the output power of laser in our scheme is more stable and reliable, moreover the peak value is bigger, and the temperature can be precisely controlled in +/-0.1°C, then the volume of the device is smaller. Using this laser equipment, the ideal Raman spectra of materials can be obtained combined with SHINERS technology and spectrometer equipment.
NASA Astrophysics Data System (ADS)
Lunquist, Johan
PAMELA is a satellite-borne cosmic ray experiment. Its primary scientific objective is to study the antiproton and positron components of the cosmic radiation. This will be done with unprecedented statistics over a wide energy range (~10MeV to ~100GeV). The PAMELA experiment consists of a permanent magnetic spectrometer, an electromagnetic calorimeter, a Time-of-Fight system, a neutron detector and a shower tail catcher. An anticoincidence (AC) system surrounds the spectrometer to detect particles which do not pass cleanly through the acceptance of the spectrometer. PAMELA will be mounted on a Russian Earth-observation satellite, and the launch is scheduled for 2006. The anticoincidence system for PAMELA has been developed by KTH, and consists of plastic scintillator detectors with photomultiplier tube read-out. Extensive testing has been performed during the development phase. Results are presented for environmental tests, tests with cosmic-rays and particle beams. The design of the digital part of the AC electronics has been realised on an FPGA (Field Programmable Gate Array) and a DSP (Digital Signal Processor). It records signals from the 16 AC photomultipliers and from various sensors for over-current and temperature. It also provides functionality for setting the photomultiplier discrimination thresholds, system testing, issuing alarms and communication with the PAMELA main data acquisition system. The design philosophy and functionality needs to be reliable and suitable for use in a space environment. To evaluate the performance of the AC detectors, a test utilizing cosmic-rays has been performed. The primary aim of the test was to calibrate the individual channels to gain knowledge of suitable discriminator levels for flight. A secondary aim was to estimate the AC detector efficiency. A lower limit of (99.89±0.04)% was obtained. An in-orbit simulation study was performed using protons to estimate trigger rates and investigate the AC system performance in a second level trigger. The average orbital trigger rate was estimated to be (8.4±0.6)Hz, consisting of (2.0±0.2)Hz good triggers and (6.4±0.5)Hz background. Inclusion of the AC system in the trigger condition to reduce background (for the purpose of data handling capacity) leads to losses of good triggers due to backscattering from the calorimeter (90% loss for 300GeV electrons and 25% for 100GeV protons). A method, using the calorimeter, for identifying backscattering events was investigated and found to reduce the loss of good events to below 1% (300GeV electrons) and 5% (100GeV protons), while maintaining a background reduction of 70%.
Single Event Transients in Linear Integrated Circuits
NASA Technical Reports Server (NTRS)
Buchner, Stephen; McMorrow, Dale
2005-01-01
On November 5, 2001, a processor reset occurred on board the Microwave Anisotropy Probe (MAP), a NASA mission to measure the anisotropy of the microwave radiation left over from the Big Bang. The reset caused the spacecraft to enter a safehold mode from which it took several days to recover. Were that to happen regularly, the entire mission would be compromised, so it was important to find the cause of the reset and, if possible, to mitigate it. NASA assembled a team of engineers that included experts in radiation effects to tackle the problem. The first clue was the observation that the processor reset occurred during a solar event characterized by large increases in the proton and heavy ion fluxes emitted by the sun. To the radiation effects engineers on the team, this strongly suggested that particle radiation might be the culprit, particularly when it was discovered that the reset circuit contained three voltage comparators (LM139). Previous testing revealed that large voltage transients, or glitches appeared at the output of the LM139 when it was exposed to a beam of heavy ions [NI96]. The function of the reset circuit was to monitor the supply voltage and to issue a reset command to the processor should the voltage fall below a reference of 2.5 V [PO02]. Eventually, the team of engineers concluded that ionizing particle radiation from the solar event produced a negative voltage transient on the output of one of the LM139s sufficiently large to reset the processor on MAP. Fortunately, as of the end of 2004, only two such resets have occurred. The reset on MAP was not the first malfunction on a spacecraft attributed to a transient. That occurred shortly after the launch of NASA s TOPEX/Poseidon satellite in 1992. It was suspected, and later confirmed, that an anomaly in the Earth Sensor was caused by a transient in an operational amplifier (OP-15) [KO93]. Over the next few years, problems on TDRS, CASSINI, [PR02] SOHO [HA99,HA01] and TERRA were also attributed to transients. In some cases, such events produced resets by falsely triggering circuits designed to protect against over- voltage or over-current. On at least three occasions, transients caused satellites to switch into "safe mode" in which most of the systems on board the satellites were powered down for an extended period. By the time the satellites were reconfigured and returned to full operational state, much scientific data had been lost. Fortunately, no permanent damage occurred in any of the systems and they were all successfully re-activated.