Science.gov

Sample records for overhead ground wire

  1. Effect of Overhead Ground Wire Installing under Distribution Lines on Surge Arrester Failures

    NASA Astrophysics Data System (ADS)

    Sugimoto, Hitoshi

    Distribution surge arresters are often damaged by lightning strokes, in particular, winter lightning. An overhead ground wire (OGW) is one of effective measures against surge arrester failures. However, adding the conventional OGW to existing overhead power distribution lines needs the power interruption for construction as well as high costs because of installing them above phase conductors. Experimental results show that a covered conductor for distribution lines is more difficult to attract lightning than a bare conductor. Moreover, lightning strokes to distribution pole heads occupied over 90% of all lightning strokes in the observation result of lightning strokes to actual distribution lines without the conventional OGW, and lightning strokes to power lines were hardly observed. These results indicate that the pole heads shield the power lines from direct lightning strokes. Therefore the author studies the application of an OGW under the distribution lines (UGW) for reducing surge arrester failures. The lightning performance of the UGW is estimated by the Electro-Magnetic Transients Program (EMTP) and its effectiveness is demonstrated. The measure is expected to cut costs of construction and maintenance for lightning protection.

  2. 2. TYPICAL OVERHEAD WIRE CONSTRUCTION CURVE GUY WIRE ARRANGEMENT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. TYPICAL OVERHEAD WIRE CONSTRUCTION - CURVE GUY WIRE ARRANGEMENT (ABANDONED WEST LEG OF WYE AT SIXTH AVENUE AND PINE STREET) - Yakima Valley Transportation Company Interurban Railroad, Trackage, Yakima, Yakima County, WA

  3. 30 CFR 75.906 - Trailing cables for mobile equipment, ground wires, and ground check wires.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Trailing cables for mobile equipment, ground wires, and ground check wires. 75.906 Section 75.906 Mineral Resources MINE SAFETY AND HEALTH..., ground wires, and ground check wires. Trailing cables for mobile equipment shall contain one or...

  4. 30 CFR 75.906 - Trailing cables for mobile equipment, ground wires, and ground check wires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Trailing cables for mobile equipment, ground wires, and ground check wires. 75.906 Section 75.906 Mineral Resources MINE SAFETY AND HEALTH..., ground wires, and ground check wires. Trailing cables for mobile equipment shall contain one or...

  5. 30 CFR 75.906 - Trailing cables for mobile equipment, ground wires, and ground check wires.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Trailing cables for mobile equipment, ground wires, and ground check wires. 75.906 Section 75.906 Mineral Resources MINE SAFETY AND HEALTH..., ground wires, and ground check wires. Trailing cables for mobile equipment shall contain one or...

  6. 30 CFR 75.906 - Trailing cables for mobile equipment, ground wires, and ground check wires.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Trailing cables for mobile equipment, ground wires, and ground check wires. 75.906 Section 75.906 Mineral Resources MINE SAFETY AND HEALTH..., ground wires, and ground check wires. Trailing cables for mobile equipment shall contain one or...

  7. 30 CFR 75.906 - Trailing cables for mobile equipment, ground wires, and ground check wires.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Trailing cables for mobile equipment, ground wires, and ground check wires. 75.906 Section 75.906 Mineral Resources MINE SAFETY AND HEALTH..., ground wires, and ground check wires. Trailing cables for mobile equipment shall contain one or...

  8. 30 CFR 75.701-4 - Grounding wires; capacity of wires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Grounding wires; capacity of wires. 75.701-4... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Grounding § 75.701-4 Grounding wires; capacity of wires. Where grounding wires are used to ground metallic sheaths, armors, conduits,...

  9. 30 CFR 75.701-4 - Grounding wires; capacity of wires.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Grounding wires; capacity of wires. 75.701-4... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Grounding § 75.701-4 Grounding wires; capacity of wires. Where grounding wires are used to ground metallic sheaths, armors, conduits,...

  10. 30 CFR 75.701-4 - Grounding wires; capacity of wires.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Grounding wires; capacity of wires. 75.701-4... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Grounding § 75.701-4 Grounding wires; capacity of wires. Where grounding wires are used to ground metallic sheaths, armors, conduits,...

  11. 30 CFR 75.701-4 - Grounding wires; capacity of wires.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Grounding wires; capacity of wires. 75.701-4... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Grounding § 75.701-4 Grounding wires; capacity of wires. Where grounding wires are used to ground metallic sheaths, armors, conduits,...

  12. 30 CFR 75.701-4 - Grounding wires; capacity of wires.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Grounding wires; capacity of wires. 75.701-4... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Grounding § 75.701-4 Grounding wires; capacity of wires. Where grounding wires are used to ground metallic sheaths, armors, conduits,...

  13. 30 CFR 77.701-3 - Grounding wires; capacity.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Grounding wires; capacity. 77.701-3 Section 77... MINES Grounding § 77.701-3 Grounding wires; capacity. Where grounding wires are used to ground metallic sheaths, armors, conduits, frames, casings, and other metallic enclosures, such grounding wires will...

  14. 30 CFR 77.701-3 - Grounding wires; capacity.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Grounding wires; capacity. 77.701-3 Section 77... MINES Grounding § 77.701-3 Grounding wires; capacity. Where grounding wires are used to ground metallic sheaths, armors, conduits, frames, casings, and other metallic enclosures, such grounding wires will...

  15. 30 CFR 77.701-3 - Grounding wires; capacity.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Grounding wires; capacity. 77.701-3 Section 77... MINES Grounding § 77.701-3 Grounding wires; capacity. Where grounding wires are used to ground metallic sheaths, armors, conduits, frames, casings, and other metallic enclosures, such grounding wires will...

  16. 30 CFR 77.701-3 - Grounding wires; capacity.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Grounding wires; capacity. 77.701-3 Section 77... MINES Grounding § 77.701-3 Grounding wires; capacity. Where grounding wires are used to ground metallic sheaths, armors, conduits, frames, casings, and other metallic enclosures, such grounding wires will...

  17. 30 CFR 77.701-3 - Grounding wires; capacity.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Grounding wires; capacity. 77.701-3 Section 77... MINES Grounding § 77.701-3 Grounding wires; capacity. Where grounding wires are used to ground metallic sheaths, armors, conduits, frames, casings, and other metallic enclosures, such grounding wires will...

  18. 30 CFR 77.705 - Guy wires; grounding.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Guy wires; grounding. 77.705 Section 77.705 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH... § 77.705 Guy wires; grounding. Guy wires from poles supporting high-voltage transmission lines shall...

  19. 30 CFR 77.705 - Guy wires; grounding.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Guy wires; grounding. 77.705 Section 77.705 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH... § 77.705 Guy wires; grounding. Guy wires from poles supporting high-voltage transmission lines shall...

  20. 30 CFR 77.705 - Guy wires; grounding.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Guy wires; grounding. 77.705 Section 77.705 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH... § 77.705 Guy wires; grounding. Guy wires from poles supporting high-voltage transmission lines shall...

  1. 30 CFR 77.705 - Guy wires; grounding.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Guy wires; grounding. 77.705 Section 77.705 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH... § 77.705 Guy wires; grounding. Guy wires from poles supporting high-voltage transmission lines shall...

  2. 30 CFR 77.705 - Guy wires; grounding.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Guy wires; grounding. 77.705 Section 77.705 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH... § 77.705 Guy wires; grounding. Guy wires from poles supporting high-voltage transmission lines shall...

  3. Detail of wire ground screen in relation to towers, looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Detail of wire ground screen in relation to towers, looking southeast - Over-the-Horizon Backscatter Radar Network, Tulelake Radar Site Receive Sector Five Antenna Array, Unnamed Road West of Double Head Road, Tulelake, Siskiyou County, CA

  4. 30 CFR 77.906 - Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check wires. 77.906 Section 77.906 Mineral Resources MINE... wires and ground check wires. On and after September 30, 1971, all trailing cables supplying power...

  5. 30 CFR 77.906 - Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check wires. 77.906 Section 77.906 Mineral Resources MINE... wires and ground check wires. On and after September 30, 1971, all trailing cables supplying power...

  6. 30 CFR 77.906 - Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check wires. 77.906 Section 77.906 Mineral Resources MINE... wires and ground check wires. On and after September 30, 1971, all trailing cables supplying power...

  7. 30 CFR 77.906 - Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check wires. 77.906 Section 77.906 Mineral Resources MINE... wires and ground check wires. On and after September 30, 1971, all trailing cables supplying power...

  8. 30 CFR 77.906 - Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check wires. 77.906 Section 77.906 Mineral Resources MINE... wires and ground check wires. On and after September 30, 1971, all trailing cables supplying power...

  9. 30 CFR 75.705-11 - Use of grounded messenger wires; ungrounded systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Use of grounded messenger wires; ungrounded....705-11 Use of grounded messenger wires; ungrounded systems. Solely for purposes of grounding ungrounded high-voltage power systems, grounded messenger wires used to suspend the cables of such...

  10. 30 CFR 75.705-11 - Use of grounded messenger wires; ungrounded systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Use of grounded messenger wires; ungrounded....705-11 Use of grounded messenger wires; ungrounded systems. Solely for purposes of grounding ungrounded high-voltage power systems, grounded messenger wires used to suspend the cables of such...

  11. 30 CFR 75.705-11 - Use of grounded messenger wires; ungrounded systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Use of grounded messenger wires; ungrounded....705-11 Use of grounded messenger wires; ungrounded systems. Solely for purposes of grounding ungrounded high-voltage power systems, grounded messenger wires used to suspend the cables of such...

  12. 30 CFR 75.705-11 - Use of grounded messenger wires; ungrounded systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Use of grounded messenger wires; ungrounded....705-11 Use of grounded messenger wires; ungrounded systems. Solely for purposes of grounding ungrounded high-voltage power systems, grounded messenger wires used to suspend the cables of such...

  13. 30 CFR 75.705-11 - Use of grounded messenger wires; ungrounded systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Use of grounded messenger wires; ungrounded....705-11 Use of grounded messenger wires; ungrounded systems. Solely for purposes of grounding ungrounded high-voltage power systems, grounded messenger wires used to suspend the cables of such...

  14. 30 CFR 75.902-4 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 75.902-4 Section 75.902-4 Mineral... § 75.902-4 Attachment of ground conductors and ground check wires to equipment frames; use of...

  15. 30 CFR 75.902-4 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 75.902-4 Section 75.902-4 Mineral... § 75.902-4 Attachment of ground conductors and ground check wires to equipment frames; use of...

  16. 30 CFR 77.902-3 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 77.902-3 Section 77.902-3 Mineral...-Voltage Alternating Current Circuits § 77.902-3 Attachment of ground conductors and ground check wires...

  17. 30 CFR 77.902-3 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 77.902-3 Section 77.902-3 Mineral...-Voltage Alternating Current Circuits § 77.902-3 Attachment of ground conductors and ground check wires...

  18. 30 CFR 77.902-3 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 77.902-3 Section 77.902-3 Mineral...-Voltage Alternating Current Circuits § 77.902-3 Attachment of ground conductors and ground check wires...

  19. 30 CFR 77.902-3 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 77.902-3 Section 77.902-3 Mineral...-Voltage Alternating Current Circuits § 77.902-3 Attachment of ground conductors and ground check wires...

  20. 30 CFR 75.902-4 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 75.902-4 Section 75.902-4 Mineral... § 75.902-4 Attachment of ground conductors and ground check wires to equipment frames; use of...

  1. 30 CFR 77.902-3 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 77.902-3 Section 77.902-3 Mineral...-Voltage Alternating Current Circuits § 77.902-3 Attachment of ground conductors and ground check wires...

  2. 30 CFR 75.902-4 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 75.902-4 Section 75.902-4 Mineral... § 75.902-4 Attachment of ground conductors and ground check wires to equipment frames; use of...

  3. 30 CFR 75.902-4 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 75.902-4 Section 75.902-4 Mineral... § 75.902-4 Attachment of ground conductors and ground check wires to equipment frames; use of...

  4. 30 CFR 77.704-11 - Use of grounded messenger wires; ungrounded systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Use of grounded messenger wires; ungrounded... AREAS OF UNDERGROUND COAL MINES Grounding § 77.704-11 Use of grounded messenger wires; ungrounded systems. Solely for purposes of grounding ungrounded high-voltage power systems, grounded messenger...

  5. 30 CFR 77.704-11 - Use of grounded messenger wires; ungrounded systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Use of grounded messenger wires; ungrounded... AREAS OF UNDERGROUND COAL MINES Grounding § 77.704-11 Use of grounded messenger wires; ungrounded systems. Solely for purposes of grounding ungrounded high-voltage power systems, grounded messenger...

  6. 30 CFR 77.704-11 - Use of grounded messenger wires; ungrounded systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Use of grounded messenger wires; ungrounded... AREAS OF UNDERGROUND COAL MINES Grounding § 77.704-11 Use of grounded messenger wires; ungrounded systems. Solely for purposes of grounding ungrounded high-voltage power systems, grounded messenger...

  7. 30 CFR 77.704-11 - Use of grounded messenger wires; ungrounded systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Use of grounded messenger wires; ungrounded... AREAS OF UNDERGROUND COAL MINES Grounding § 77.704-11 Use of grounded messenger wires; ungrounded systems. Solely for purposes of grounding ungrounded high-voltage power systems, grounded messenger...

  8. 30 CFR 77.704-11 - Use of grounded messenger wires; ungrounded systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Use of grounded messenger wires; ungrounded... AREAS OF UNDERGROUND COAL MINES Grounding § 77.704-11 Use of grounded messenger wires; ungrounded systems. Solely for purposes of grounding ungrounded high-voltage power systems, grounded messenger...

  9. 30 CFR 77.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... pilot check wires. 77.902-2 Section 77.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... Approved ground check systems not employing pilot check wires. Ground check systems not employing pilot check wires shall be approved by the Secretary only after it has been determined that the...

  10. 30 CFR 77.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... pilot check wires. 77.902-2 Section 77.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... Approved ground check systems not employing pilot check wires. Ground check systems not employing pilot check wires shall be approved by the Secretary only after it has been determined that the...

  11. 30 CFR 75.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Approved ground check systems not employing pilot check wires. 75.902-2 Section 75.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... employing pilot check wires. Ground check systems not employing pilot check wires will be approved only...

  12. 30 CFR 75.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Approved ground check systems not employing pilot check wires. 75.902-2 Section 75.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... employing pilot check wires. Ground check systems not employing pilot check wires will be approved only...

  13. 30 CFR 75.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Approved ground check systems not employing pilot check wires. 75.902-2 Section 75.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... employing pilot check wires. Ground check systems not employing pilot check wires will be approved only...

  14. 30 CFR 77.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... pilot check wires. 77.902-2 Section 77.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... Approved ground check systems not employing pilot check wires. Ground check systems not employing pilot check wires shall be approved by the Secretary only after it has been determined that the...

  15. 30 CFR 75.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Approved ground check systems not employing pilot check wires. 75.902-2 Section 75.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... employing pilot check wires. Ground check systems not employing pilot check wires will be approved only...

  16. 30 CFR 75.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Approved ground check systems not employing pilot check wires. 75.902-2 Section 75.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... employing pilot check wires. Ground check systems not employing pilot check wires will be approved only...

  17. 30 CFR 77.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... pilot check wires. 77.902-2 Section 77.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... Approved ground check systems not employing pilot check wires. Ground check systems not employing pilot check wires shall be approved by the Secretary only after it has been determined that the...

  18. 30 CFR 77.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... pilot check wires. 77.902-2 Section 77.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... Approved ground check systems not employing pilot check wires. Ground check systems not employing pilot check wires shall be approved by the Secretary only after it has been determined that the...

  19. New method for lightning location using optical ground wire

    NASA Astrophysics Data System (ADS)

    Qin, Zhaoyu; Cheng, Zhaogu; Zhang, Zhiping; Zhu, Jianqiang; Li, Feng

    2006-12-01

    A new technology of lightning location is described, which is based on detecting the state of polarization (SOP) fluctuation of the laser light in the optic ground wire (OPGW). Compared with the conventional lightning location method, the new method is more accurate, more stable, and cheaper. Theories of Stokes parameters and Poincare sphere are introduced to analyze the SOP at the lightning strike point. It can be concluded that although the initial points of SOP on the Poincare sphere are random, the SOP fluctuation generated by lightning strike can still be accurately identified by detecting the velocity of polarization motion. A new algorithm to quantify the velocity is also introduced.

  20. Ground-state energy of the electron liquid in ultrathin wires.

    PubMed

    Fogler, Michael M

    2005-02-11

    The ground-state energy and the density correlation function of the electron liquid in a thin one-dimensional wire are computed. The calculation is based on an approximate mapping of the problem with a realistic Coulomb interaction law onto exactly solvable models of mathematical physics. This approach becomes asymptotically exact in the limit of a small wire radius but remains numerically accurate even for modestly thin wires.

  1. 30 CFR 75.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... wires; approval by the Secretary. 75.803-2 Section 75.803-2 Mineral Resources MINE SAFETY AND HEALTH... Underground High-Voltage Distribution § 75.803-2 Ground check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires will be approved only if...

  2. 30 CFR 75.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... wires; approval by the Secretary. 75.803-2 Section 75.803-2 Mineral Resources MINE SAFETY AND HEALTH... Underground High-Voltage Distribution § 75.803-2 Ground check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires will be approved only if...

  3. 30 CFR 75.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... wires; approval by the Secretary. 75.803-2 Section 75.803-2 Mineral Resources MINE SAFETY AND HEALTH... Underground High-Voltage Distribution § 75.803-2 Ground check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires will be approved only if...

  4. 30 CFR 75.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... wires; approval by the Secretary. 75.803-2 Section 75.803-2 Mineral Resources MINE SAFETY AND HEALTH... Underground High-Voltage Distribution § 75.803-2 Ground check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires will be approved only if...

  5. 30 CFR 75.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... wires; approval by the Secretary. 75.803-2 Section 75.803-2 Mineral Resources MINE SAFETY AND HEALTH... Underground High-Voltage Distribution § 75.803-2 Ground check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires will be approved only if...

  6. 30 CFR 77.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... wires; approval by the Secretary. 77.803-2 Section 77.803-2 Mineral Resources MINE SAFETY AND HEALTH... check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires shall be approved by the Secretary only if it is determined that the...

  7. 30 CFR 77.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... wires; approval by the Secretary. 77.803-2 Section 77.803-2 Mineral Resources MINE SAFETY AND HEALTH... check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires shall be approved by the Secretary only if it is determined that the...

  8. 30 CFR 77.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... wires; approval by the Secretary. 77.803-2 Section 77.803-2 Mineral Resources MINE SAFETY AND HEALTH... check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires shall be approved by the Secretary only if it is determined that the...

  9. 30 CFR 77.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... wires; approval by the Secretary. 77.803-2 Section 77.803-2 Mineral Resources MINE SAFETY AND HEALTH... check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires shall be approved by the Secretary only if it is determined that the...

  10. 30 CFR 77.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... wires; approval by the Secretary. 77.803-2 Section 77.803-2 Mineral Resources MINE SAFETY AND HEALTH... check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires shall be approved by the Secretary only if it is determined that the...

  11. Hybrid modelling of near-field coupling onto grounded wire under ultra-short duration perturbation

    NASA Astrophysics Data System (ADS)

    Ravelo, B.; Liu, Y.

    2014-10-01

    A time-frequency (TF) hybrid model (HM) for investigating the interaction between EM near-field (NF) aggression and grounded wire is addressed. The HM is based on the combination of techniques for extracting the EM NF radiated by electronic structures and the calculation of electrical disturbances across the wire due to EM coupling. The computation method is fundamentally inspired from transmission line (TL) theory under EM illumination. The methodology including flow chart interpreting the routine algorithm based on the combination of frequency and time domain approaches is featured. An experimental result showing the EM coupling between patch antenna-wire from 1.5-3.5GHz reveals the efficiency of the HM in frequency domain. The relevance of this HM was illustrated with a structure comprised of 20cm aggressor and 5cm victim I-shaped wires placed above a planar ground plane. The aggressor was excited with 40ns duration perturbation signal. After Matlab implementation of the HM, the disturbance voltages across the extremity of the victim wire were extracted. This simple and fast HM is useful for the EMC engineering during the design and fabrication phases of electrical and electronic systems.

  12. Overhead Projector Demonstrations.

    ERIC Educational Resources Information Center

    Hambly, Gordon F.; Goldsmith, Robert H.

    1988-01-01

    Presented is a method of demonstrating the optical activity of glucose using an overhead projector and easily obtainable materials. Explores the difference between reflected and transmitted light (Tyndall Effect) using sodium thiosulfate, hydrochloric acid, and an overhead projector. (ML)

  13. Ground characterization of the Wide-field Infrared Explorer (WIRE) instrument

    NASA Astrophysics Data System (ADS)

    Kemp, John C.; Larsen, Mark F.; Peterson, James Q.; Sargent, Steven D.

    1998-11-01

    The Wide-Field Infrared Explorer (WIRE) is a small cryogenic spaceborne infrared telescope being readied for launch in September 1998 as the fifth of NASA's Small Explorers. WIRE utilizes two 128 X 128 Si:As Focal Plane Arrays (FPAs) produced by Boeing North American with a 30 cm diameter Ritchey Cretien diamond turned mirror system. This mission takes advantage of recent advances in infrared array detector technology to provide a large sensitivity gain over previously flown missions. Two broad pass bands are defined for a deep pointed survey to search for protogalaxies and to study the evolution of starburst galaxies. The Space Dynamics Laboratory at Utah State University (SDL/USU) used the multifunction infrared calibrator and other special purpose cryogenic equipment to perform a ground characterization of the WIRE instrument. The focus was verified cold with two independent measurements. Both in-band and out-of-band Relative Spectral Response measurements were made; some sensitivity to temperature, bias voltage, and location on the long wavelength focal plane array were found. Dark current and dark noise measurements are also reported.

  14. The rocket-and-wire triggering process: Channel-base currents and ground-level electric fields

    NASA Astrophysics Data System (ADS)

    Ngin, Terry Keo

    Rocket-and-wire triggered lightning flashes were studied from 2011 to 2013 at the International Center for Lightning Research and Testing. Ground-level electric fields and channel-base currents were recorded for 79 rocket launches. An eight-station network of electric field meters along with a milliampere-scale wire-base current measurement and a high-speed video record of the wire ascent allowed the calculation and analysis of the trigger-wire line charge density, generally found to be in the muC m-1 to hundreds of muC m-1 range and to increase quadratically with height. The wire-base currents collected during the wire ascent here are the most comprehensive in the literature to date. The trigger-wire line charge density, electric field at ground level, and characteristics of precursor pulses at the wire tip were examined to determine their usefulness in predicting the success or failure of a triggered-lightning attempt. The usefulness of the PICASSO model of space charge evolution from ground, originally developed by researchers at Paul Sabatier University in the 1980s, as a triggering criterion was also evaluated. An electrostatic model of the corona sheath around the trigger-wire was developed in order to estimate the radial extent of the corona sheath and the charge distribution within the corona sheath as a function of measured electric fields aloft taken from the published literature. The most sensitive measurements to date of channel-base current flowing prior to subsequent return strokes, where the current had generally been considered to be zero, were collected and are analyzed here. The channel-base current before return strokes was found to average 5.3 mA with a 2.8 mA standard deviation prior to 120 measured return strokes.

  15. Computer Program for Thin Wire Antenna over a Perfectly Conducting Ground Plane. [using Galerkins method and sinusoidal bases

    NASA Technical Reports Server (NTRS)

    Richmond, J. H.

    1974-01-01

    A computer program is presented for a thin-wire antenna over a perfect ground plane. The analysis is performed in the frequency domain, and the exterior medium is free space. The antenna may have finite conductivity and lumped loads. The output data includes the current distribution, impedance, radiation efficiency, and gain. The program uses sinusoidal bases and Galerkin's method.

  16. Overhead Image Statistics

    SciTech Connect

    Vijayaraj, Veeraraghavan; Cheriyadat, Anil M; Bhaduri, Budhendra L; Vatsavai, Raju; Bright, Eddie A

    2008-01-01

    Statistical properties of high-resolution overhead images representing different land use categories are analyzed using various local and global statistical image properties based on the shape of the power spectrum, image gradient distributions, edge co-occurrence, and inter-scale wavelet coefficient distributions. The analysis was performed on a database of high-resolution (1 meter) overhead images representing a multitude of different downtown, suburban, commercial, agricultural and wooded exemplars. Various statistical properties relating to these image categories and their relationship are discussed. The categorical variations in power spectrum contour shapes, the unique gradient distribution characteristics of wooded categories, the similarity in edge co-occurrence statistics for overhead and natural images, and the unique edge co-occurrence statistics of downtown categories are presented in this work. Though previous work on natural image statistics has showed some of the unique characteristics for different categories, the relationships for overhead images are not well understood. The statistical properties of natural images were used in previous studies to develop prior image models, to predict and index objects in a scene and to improve computer vision models. The results from our research findings can be used to augment and adapt computer vision algorithms that rely on prior image statistics to process overhead images, calibrate the performance of overhead image analysis algorithms, and derive features for better discrimination of overhead image categories.

  17. Overhead Projector Demonstrations.

    ERIC Educational Resources Information Center

    Kolb, Doris, Ed.

    1989-01-01

    Described are demonstrations of the optical activity of two sugar solutions, and the effects of various substituents on acid strength using an overhead projector. Materials and procedures for each demonstration are discussed. (CW)

  18. Anania Shirakatsi's Overheads System

    NASA Astrophysics Data System (ADS)

    Eynatyan, Julieta

    2014-10-01

    A review of Anania Shirakatsi's overheads system is given based on his chronological works. Lunar, solar and lunisolar calendars are discussed. Anania Shirakatsi is presented as having an important role in the establishment of the Armenian unique chronology.

  19. Wire-grid electromagnetic modelling of metallic cylindrical objects with arbitrary section, for Ground Penetrating Radar applications

    NASA Astrophysics Data System (ADS)

    Adabi, Saba; Pajewski, Lara

    2014-05-01

    This work deals with the electromagnetic wire-grid modelling of metallic cylindrical objects, buried in the ground or embedded in a structure, for example in a wall or in a concrete slab. Wire-grid modelling of conducting objects was introduced by Richmond in 1966 [1] and, since then, this method has been extensively used over the years to simulate arbitrarily-shaped objects and compute radiation patterns of antennas, as well as the electromagnetic field scattered by targets. For any wire-grid model, a fundamental question is the choice of the optimum wire radius and grid spacing. The most widely used criterion to fix the wire size is the so-called same-area rule [2], coming from empirical observation: the total surface area of the wires has to be equal to the surface area of the object being modelled. However, just few authors have investigated the validity of this criterion. Ludwig [3] studied the reliability of the rule by examining the canonical radiation problem of a transverse magnetic field by a circular cylinder fed with a uniform surface current, compared with a wire-grid model; he concluded that the same-area rule is optimum and that too thin wires are just as bad as too thick ones. Paknys [4] investigated the accuracy of the same-area rule for the modelling of a circular cylinder with a uniform current on it, continuing the study initiated in [3], or illuminated by a transverse magnetic monochromatic plane wave; he deduced that the same-area rule is optimal and that the field inside the cylinder is most sensitive to the wire radius than the field outside the object, so being a good error indicator. In [5], a circular cylinder was considered, embedded in a dielectric half-space and illuminated by a transverse magnetic monochromatic plane wave; the scattered near field was calculated by using the Cylindrical-Wave Approach and numerical results, obtained for different wire-grid models in the spectral domain, were compared with the exact solution. The

  20. Ground-State Electronic Structure of Quasi-One-Dimensional Wires in Semiconductor Heterostructures

    NASA Astrophysics Data System (ADS)

    Owen, E. T.; Barnes, C. H. W.

    2016-11-01

    We apply density-functional theory, in the local-density approximation, to a quasi-one-dimensional electron gas in order to quantify the effect of Coulomb and correlation effects in modulating and, therefore, patterning, the charge-density distribution. Our calculations are presented specifically for surface-gate-defined quasi-one-dimensional quantum wires in a GaAs-(AlGa)As heterostructure, but we expect our results to apply more generally for other low-dimensional semiconductor systems. We show that at high densities with strong confinement, screening of electrons in the direction transverse to the wire is efficient and density modulations are not visible. In the low-density, weak-confinement regime, the exchange-correlation potential induces small density modulations as the electrons are depleted from the wire. At the weakest confinements and lowest densities, the electron density splits into two rows, thereby forming a pair of quantum wires that lies beneath the surface gates. An additional double-well external potential forms at very low density which enhances this row-splitting phenomenon. We produce phase diagrams that show a transition between the presence of a single quantum wire in a split-gate structure and two quantum wires. We suggest that this phenomenon can be used to pattern and modulate the electron density in low-dimensional structures with particular application to systems where a proximity effect from a surface gate is valuable.

  1. Demonstrating Forces between Parallel Wires.

    ERIC Educational Resources Information Center

    Baker, Blane

    2000-01-01

    Describes a physics demonstration that dramatically illustrates the mutual repulsion (attraction) between parallel conductors using insulated copper wire, wooden dowels, a high direct current power supply, electrical tape, and an overhead projector. (WRM)

  2. Overhead Projector Demonstrations.

    ERIC Educational Resources Information Center

    Kolb, Doris, Ed.

    1988-01-01

    Details two demonstrations for use with an overhead projector in a chemistry lecture. Includes "A Very Rapidly Growing Silicate Crystal" and "A Colorful Demonstration to Simulate Orbital Hybridization." The materials and directions for each demonstration are included as well as a brief explanation of the essential learning involved. (CW)

  3. Operative Mechanism of Hole-Assisted Negative Charge Motion in Ground States of Radical-Anion Molecular Wires.

    PubMed

    Franco, Carlos; Burrezo, Paula Mayorga; Lloveras, Vega; Caballero, Rubén; Alcón, Isaac; Bromley, Stefan T; Mas-Torrent, Marta; Langa, Fernando; López Navarrete, Juan T; Rovira, Concepciò; Casado, Juan; Veciana, Jaume

    2017-01-18

    Charge transfer/transport in molecular wires over varying distances is a subject of great interest. The feasible transport mechanisms have been generally accounted for on the basis of tunneling or superexchange charge transfer operating over small distances which progressively gives way to hopping transport over larger distances. The underlying molecular sequential steps that likely take place during hopping and the operative mechanism occurring at intermediate distances have received much less attention given the difficulty in assessing detailed molecular-level information. We describe here the operating mechanisms for unimolecular electron transfer/transport in the ground state of radical-anion mixed-valence derivatives occurring between their terminal perchlorotriphenylmethyl/ide groups through thiophene-vinylene oligomers that act as conjugated wires of increasing length up to 53 Å. The unique finding here is that the net transport of the electron in the larger molecular wires is initiated by an electron-hole dissociation intermediated by hole delocalization (conformationally assisted and thermally dependent) forming transient mobile polaronic states in the bridge that terminate by an electron-hole recombination at the other wire extreme. On the contrary, for the shorter radical-anions our results suggest that a flickering resonance mechanism which is intermediate between hopping and superexchange is the operative one. We support these mechanistic interpretations by applying the pertinent biased kinetic models of the charge/spin exchange rates determined by electron paramagnetic resonance and by molecular structural level information obtained from UV-vis and Raman spectroscopies and by quantum chemical modeling.

  4. Overhead camshaft engine

    SciTech Connect

    Honma, M.

    1987-07-21

    This patent describes an overhead camshaft engine comprising: a cylinder block; a cylinder head; a fastening member for fastening the cylinder head to the cylinder block; a valve reciprocally mounted in the cylinder head; and a camshaft rotatably mounted over the cylinder head to control reciprocation of the valve; the camshaft being so arranged, with respect to a plan view, as to lap in part over the fastening member and formed with a peripheral cut at a portion where it laps over the fastening member to facilitate insertion and removal of the fastening member.

  5. Overhead-valve engine

    SciTech Connect

    Tamba, S.; Miyake, H.; Fukui, N.

    1987-05-05

    An overhead valve engine is described comprising: push rod receiving bores, at least one of the push rod receiving bores being maintained in communication at one end with a crank chamber and at an opposite end with a rocker arm chamber and at least one other push rod receiving bore being maintained in communication with the rocker arm chamber; push rods contained within push rod receiving bores; and a breather chamber in communication with at least one other push rod receiving bore in the vicinity of a camshaft.

  6. Numerical analysis of complex impedance and microwave absorption of metamaterials composed of split cut wires on grounded dielectric substrate

    NASA Astrophysics Data System (ADS)

    Lim, Jun-Hee; Liu, Tian; Kim, Sung-Soo

    2014-06-01

    The microwave absorption of metamaterials composed of split cut wire (SCW) on grounded dielectric substrate has been investigated on the basis of equivalent transmission line circuit. S-parameters (S 11 and S 21) and input impedance are numerically simulated with variations of the thickness and dielectric loss of the substrate and the geometry of the SCW. Magnetic resonance resulting from antiparallel currents between SCW and ground plane was observed at the frequency of minimum reflection loss. The simulated resonance frequency and reflection loss can be explained well on the basis of the circuit theory of an LC resonator. Analysis of the input impedance of the high impedance surface has shown that perfect absorption can be obtained at the optimized impedance-matching condition, which is dependent on SCW width, thickness and the dielectric loss of the substrate. Better insight into the absorption mechanism of metamaterial absorbers can be attained through the parametric analysis on complex impedance of SCW and its relationship with reflection loss.

  7. Predictive model of avian electrocution risk on overhead power lines.

    PubMed

    Dwyer, J F; Harness, R E; Donohue, K

    2014-02-01

    Electrocution on overhead power structures negatively affects avian populations in diverse ecosystems worldwide, contributes to the endangerment of raptor populations in Europe and Africa, and is a major driver of legal action against electric utilities in North America. We investigated factors associated with avian electrocutions so poles that are likely to electrocute a bird can be identified and retrofitted prior to causing avian mortality. We used historical data from southern California to identify patterns of avian electrocution by voltage, month, and year to identify species most often killed by electrocution in our study area and to develop a predictive model that compared poles where an avian electrocution was known to have occurred (electrocution poles) with poles where no known electrocution occurred (comparison poles). We chose variables that could be quantified by personnel with little training in ornithology or electric systems. Electrocutions were more common at distribution voltages (≤ 33 kV) and during breeding seasons and were more commonly reported after a retrofitting program began. Red-tailed Hawks (Buteo jamaicensis) (n = 265) and American Crows (Corvus brachyrhynchos) (n = 258) were the most commonly electrocuted species. In the predictive model, 4 of 14 candidate variables were required to distinguish electrocution poles from comparison poles: number of jumpers (short wires connecting energized equipment), number of primary conductors, presence of grounding, and presence of unforested unpaved areas as the dominant nearby land cover. When tested against a sample of poles not used to build the model, our model distributed poles relatively normally across electrocution-risk values and identified the average risk as higher for electrocution poles relative to comparison poles. Our model can be used to reduce avian electrocutions through proactive identification and targeting of high-risk poles for retrofitting.

  8. Change in the direction of electric wind from a wire electrode tilted relative to a grounded plane

    NASA Astrophysics Data System (ADS)

    Elagin, I. A.; Begal', D. I.; Ashikhmin, I. A.; Stishkov, Yu. K.

    2017-01-01

    We report on experimental investigations of the structure of electric (ionic) wind in the wire-versus-plane electrode system with a constant interelectrode gap and variable wire tilt angle relative to the plane. Characteristic wind velocity distributions were determined using a laser Doppler anemometry technique. It is established that the position of the narrow central jet of the wind significantly changes depending on the tilt of the corona-forming electrode.

  9. Spectroscopy on the Overhead Projector.

    ERIC Educational Resources Information Center

    Solomon, Sally; And Others

    1994-01-01

    Any overhead projector easily can be converted into a simple spectrometer by placing a piece of diffraction grating over the projecting lens. A detailed description of the apparatus and suggested spectroscopy experiments are included. Demonstrations can utilize solutions of cobalt chloride, potassium permanganate, potassium dichromate, or…

  10. Creating Great Overheads with Computers.

    ERIC Educational Resources Information Center

    Gribas, Cyndy; And Others

    1996-01-01

    Steps in preparing effective overhead projector transparencies for college instruction are outlined, using the PowerPoint program for Windows. They include thinking analogically in translating from concept to visual form; using the features of the presentation program to create a polished product; and assuring readability (visibility, typeface…

  11. 49 CFR 236.754 - Line, open wire.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Line, open wire. 236.754 Section 236.754 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... Line, open wire. An overhead wire line consisting of single conductors as opposed to...

  12. 49 CFR 236.754 - Line, open wire.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Line, open wire. 236.754 Section 236.754 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... Line, open wire. An overhead wire line consisting of single conductors as opposed to...

  13. 49 CFR 236.754 - Line, open wire.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Line, open wire. 236.754 Section 236.754 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... Line, open wire. An overhead wire line consisting of single conductors as opposed to...

  14. 49 CFR 236.754 - Line, open wire.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Line, open wire. 236.754 Section 236.754 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... Line, open wire. An overhead wire line consisting of single conductors as opposed to...

  15. 49 CFR 236.754 - Line, open wire.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Line, open wire. 236.754 Section 236.754 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... Line, open wire. An overhead wire line consisting of single conductors as opposed to...

  16. Manipulator system for constructing overhead distribution lines

    SciTech Connect

    Ohnishi, H.; Tsuchihashi, H.; Waki, S.; Mochizuki, K. ); Yamamoto, T.; Watanabe, H. ); Furukawa, H. )

    1993-04-01

    This paper describes the manipulator for live-line construction of high-voltage overhead power transmission lines (line voltage 6.6 kV) that is being jointly developed by Tokyo Electric Power and other companies. It describes this system's development concept, makeup, functions, and design, as well as operability tests using actual-scale transmission line poles. In this research, development began in 1984. As the first step, a prototype model of a ground-mounted twin-arm manipulator was trial-manufactured in 1985. As the second step, in 1988 a truck-mounted system was developed in which the twin-arm manipulator was mounted on a cherrypicker vehicle. As the third step, a practical system was developed based on these results.

  17. Quantum compiling with low overhead

    NASA Astrophysics Data System (ADS)

    Duclos-Cianci, Guillaume; Poulin, David

    2014-03-01

    I will present a scheme to compile complex quantum gates that uses significantly fewer resources than existing schemes. In standard fault-tolerant protocols, a magic state is distilled from noisy resources, and copies of this magic state are then assembled into produced complex gates using the Solovay-Kitaev theorem or variants thereof. In our approach, we instead directly distill magic states associated to complex gates from noisy resources, leading to a reduction of the compiling overhead of several orders of magnitude.

  18. Overhead View of Pathfinder Landing Site

    NASA Technical Reports Server (NTRS)

    1997-01-01

    Planimetric (overhead view) map of the landing site, to a distance of 20 meters from the spacecraft. North is at the top in this and Plates 3-5. To produce this map, images were geometrically projected onto an assumed mean surface representing the ground. Features above the ground plane (primarily rocks) therefore appear displaced radially outward; the amount of distortion increases systematically with distance. The upper surfaces of the lander and rover also appear enlarged and displaced because of their height. Primary grid (white) is based on the Landing Site Cartographic (LSC) coordinate system, defined with X eastward, Y north, and Z up, and origin located at the mean ground surface immediately beneath the deployed position of the IMP camera gimbal center. Secondary ticks (cyan) are based on the Mars local level (LL) frame, which has X north, Y east, Z down, with origin in the center of the lander baseplate. Rover positions (including APXS measurements) are commonly reported in the LL frame. Yellow grid shows polar coordinates based on the LSC system. Cartographic image processing by U.S. Geological Survey.

    NOTE: original caption as published in Science Magazine

    Mars Pathfinder is the second in NASA's Discovery program of low-cost spacecraft with highly focused science goals. The Jet Propulsion Laboratory, Pasadena, CA, developed and manages the Mars Pathfinder mission for NASA's Office of Space Science, Washington, D.C. JPL is a division of the California Institute of Technology (Caltech).

  19. Proximal Biceps in Overhead Athletes.

    PubMed

    Chalmers, Peter N; Verma, Nikhil N

    2016-01-01

    The proximal long head of the biceps tendon and its attachment at the superior glenoid tubercle and labrum are subject to a spectrum of disorders in overhead athletes. Biceps disorders are commonly characterized by intermittent anterior or deep-seated shoulder pain exacerbated by activity. Diagnosis is reached via various physical examination maneuvers; MRI can be uncertain. Nonsteroidal anti-inflammatory medications, targeted ultrasound-guided corticosteroid injections, and supervised physical therapy are the mainstays of nonoperative treatment. Operative treatment, which remains controversial, provides reliable pain relief, restoration of function for activities of daily living, and low complication rates, but return to play can be unpredictable.

  20. Reliable Wiring Harness

    NASA Technical Reports Server (NTRS)

    Gaspar, Kenneth C.

    1987-01-01

    New harness for electrical wiring includes plugs that do not loosen from vibration. Ground braids prevented from detaching from connectors and constrained so braids do not open into swollen "birdcage" sections. Spring of stainless steel encircles ground braid. Self-locking connector contains ratchet not only preventing connector from opening, but tightens when vibrated.

  1. Limiting electric fields of HVDC overhead power lines.

    PubMed

    Leitgeb, N

    2014-05-01

    As a consequence of the increased use of renewable energy and the now long distances between energy generation and consumption, in Europe, electric power transfer by high-voltage (HV) direct current (DC) overhead power lines gains increasing importance. Thousands of kilometers of them are going to be built within the next years. However, existing guidelines and regulations do not yet contain recommendations to limit static electric fields, which are one of the most important criteria for HVDC overhead power lines in terms of tower design, span width and ground clearance. Based on theoretical and experimental data, in this article, static electric fields associated with adverse health effects are analysed and various criteria are derived for limiting static electric field strengths.

  2. Basic Wiring.

    ERIC Educational Resources Information Center

    Kaltwasser, Stan; And Others

    This module is the first in a series of three wiring publications; it serves as the foundation for students enrolled in a wiring program. It is a prerequisite to either "Residential Wiring" or "Commercial and Industrial Wiring." The module contains 16 instructional units that cover the following topics: occupational…

  3. 30 CFR 57.12053 - Circuits powered from trolley wires.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Circuits powered from trolley wires. 57.12053... Electricity Surface and Underground § 57.12053 Circuits powered from trolley wires. Ground wires for lighting circuits powered from trolley wires shall be connected securely to the ground return circuit. Surface Only...

  4. 30 CFR 57.12053 - Circuits powered from trolley wires.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Circuits powered from trolley wires. 57.12053... Electricity Surface and Underground § 57.12053 Circuits powered from trolley wires. Ground wires for lighting circuits powered from trolley wires shall be connected securely to the ground return circuit. Surface Only...

  5. 30 CFR 57.12053 - Circuits powered from trolley wires.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Circuits powered from trolley wires. 57.12053... Electricity Surface and Underground § 57.12053 Circuits powered from trolley wires. Ground wires for lighting circuits powered from trolley wires shall be connected securely to the ground return circuit. Surface Only...

  6. 30 CFR 57.12053 - Circuits powered from trolley wires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Circuits powered from trolley wires. 57.12053... Electricity Surface and Underground § 57.12053 Circuits powered from trolley wires. Ground wires for lighting circuits powered from trolley wires shall be connected securely to the ground return circuit. Surface Only...

  7. 30 CFR 57.12053 - Circuits powered from trolley wires.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Circuits powered from trolley wires. 57.12053... Electricity Surface and Underground § 57.12053 Circuits powered from trolley wires. Ground wires for lighting circuits powered from trolley wires shall be connected securely to the ground return circuit. Surface Only...

  8. Overhead Door Company of Charleston Information Sheet

    EPA Pesticide Factsheets

    Overhead Door Company of Charleston (the Company) is located in North Charleston, South Carolina. The settlement involves renovation activities conducted at a property constructed prior to 1978, located in Isle of Palms, South Carolina.

  9. 29 CFR 1926.1438 - Overhead & gantry cranes.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 8 2012-07-01 2012-07-01 false Overhead & gantry cranes. 1926.1438 Section 1926.1438 Labor... Overhead & gantry cranes. (a) Permanently installed overhead and gantry cranes. The requirements of § 1910... equipment when used in construction and permanently installed in a facility: overhead and gantry...

  10. 29 CFR 1926.1438 - Overhead & gantry cranes.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 8 2014-07-01 2014-07-01 false Overhead & gantry cranes. 1926.1438 Section 1926.1438 Labor... Overhead & gantry cranes. (a) Permanently installed overhead and gantry cranes. The requirements of § 1910... equipment when used in construction and permanently installed in a facility: overhead and gantry...

  11. 29 CFR 1926.1438 - Overhead & gantry cranes.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 8 2011-07-01 2011-07-01 false Overhead & gantry cranes. 1926.1438 Section 1926.1438 Labor... Overhead & gantry cranes. (a) Permanently installed overhead and gantry cranes. The requirements of § 1910... equipment when used in construction and permanently installed in a facility: overhead and gantry...

  12. 29 CFR 1926.1438 - Overhead & gantry cranes.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 8 2013-07-01 2013-07-01 false Overhead & gantry cranes. 1926.1438 Section 1926.1438 Labor... Overhead & gantry cranes. (a) Permanently installed overhead and gantry cranes. The requirements of § 1910... equipment when used in construction and permanently installed in a facility: overhead and gantry...

  13. Study of Corrosion Resistance Improvement by Metallic Coating for Overhead Transmission Line Conductor

    NASA Astrophysics Data System (ADS)

    Isozaki, Masanori; Adachi, Kouichi; Hita, Takanori; Asano, Yuji

    Applying anti-corrosion grease and aluminum clad steel (AC) wires to ACSR has adopted as general methods to prevent overhead transmission line conductors and/or wires from corrosion. However, there are some cases that ineffectiveness of those means are reported on some transmission lines passing through acid atmosphere in the vicinity of a factory exhausting acid smoke. The feature of the corrosion caused by acid atmosphere is to show a higher speed in its progressing as well known. As means against such acid corrosion, application of high purity aluminum, selective removal of inter-metallic compound in aluminum and plastic coating wires has been reported before, and each has both of advantage and disadvantage actually. In the former letter, we reported the new type of anti-corrosion grease that shows an excellent property against acid atmosphere as well as in a salty circumstance. Here presents a new type of anti-corrosion technology of applying high corrosion resistance aluminum alloy or zinc coatings on each component wires of a conductor that we succeed in developing through a serial study of anti-corrosion methods on overhead transmission lines.

  14. 45. MACHINE SHOP NORTH/NORTHEAST INCLUDING OVERHEAD LINE SHAFTING. MOSTLY BELT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. MACHINE SHOP NORTH/NORTHEAST INCLUDING OVERHEAD LINE SHAFTING. MOSTLY BELT DRIVEN WITH ONE ROPE DRIVEN LATHE IN MIDDLE GROUND. POWER COMES FROM KNIGHT TURBINE ON FAR WALL SHOWN IN K-77, 78 (42') - Knight Foundry, 13 Eureka Street, Sutter Creek, Amador County, CA

  15. Overhead-Aware-Best-Fit (OABF) Resource Allocation Algorithm for Minimizing VM Launching Overhead

    SciTech Connect

    Wu, Hao; Garzoglio, Gabriele; Ren, Shangping; Timm, Steven; Noh, Seo Young

    2014-11-11

    FermiCloud is a private cloud developed in Fermi National Accelerator Laboratory to provide elastic and on-demand resources for different scientific research experiments. The design goal of the FermiCloud is to automatically allocate resources for different scientific applications so that the QoS required by these applications is met and the operational cost of the FermiCloud is minimized. Our earlier research shows that VM launching overhead has large variations. If such variations are not taken into consideration when making resource allocation decisions, it may lead to poor performance and resource waste. In this paper, we show how we may use an VM launching overhead reference model to minimize VM launching overhead. In particular, we first present a training algorithm that automatically tunes a given refer- ence model to accurately reflect FermiCloud environment. Based on the tuned reference model for virtual machine launching overhead, we develop an overhead-aware-best-fit resource allocation algorithm that decides where and when to allocate resources so that the average virtual machine launching overhead is minimized. The experimental results indicate that the developed overhead-aware-best-fit resource allocation algorithm can significantly improved the VM launching time when large number of VMs are simultaneously launched.

  16. Viewing Vertical Objects with an Overhead Projector.

    ERIC Educational Resources Information Center

    Wild, R. L.

    1988-01-01

    Discusses the use of an overhead projector for the deflection of a vertical image to a screen. Describes three demonstrations: magnetizing of a steel ball bearing and paper clip; convection currents of a hot liquid within a cold liquid; and oscillation of concentrated salt solution into fresh water. (YP)

  17. 30 CFR 56.12045 - Overhead powerlines.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Overhead powerlines. 56.12045 Section 56.12045 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity §...

  18. 30 CFR 56.12045 - Overhead powerlines.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Overhead powerlines. 56.12045 Section 56.12045 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity §...

  19. 30 CFR 56.12045 - Overhead powerlines.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Overhead powerlines. 56.12045 Section 56.12045 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity §...

  20. 30 CFR 56.12045 - Overhead powerlines.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Overhead powerlines. 56.12045 Section 56.12045 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity §...

  1. 30 CFR 56.12045 - Overhead powerlines.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Overhead powerlines. 56.12045 Section 56.12045 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity §...

  2. The Overhead Projector in the Mathematics Classroom.

    ERIC Educational Resources Information Center

    Lenchner, George

    The first section of this pamphlet illustrates and describes the overhead projector, and discusses several of its advantages over other projection devises, including its simplicity of operation, conservation of class time, dynamic effects, image size, etc. The second section describes in some detail materials and methods used to make visuals, then…

  3. Centripetal Force on an Overhead Projector.

    ERIC Educational Resources Information Center

    Rheam, Harry

    1995-01-01

    Describes two simple demonstrations of an object moving in a straight line tangent to the circle if centripetal force is removed. Demonstrations use a pie plate and petri dish with ball bearings to illustrate the phenomena on an overhead projector. (LZ)

  4. Overhead Projection Cell for Streamline Flow

    ERIC Educational Resources Information Center

    Waage, Harold M.

    1969-01-01

    Describes the construction and operation of an overhead projection apparatus designed to demonstrate streamline flow of a liquid. The apparatus consists of a Plexiglass tank containing water in which plates forming the cell are submerged, a constant level reservoir, an overflow device and a system for marking the flow lines with a dye. (LC)

  5. Residential Wiring.

    ERIC Educational Resources Information Center

    Taylor, Mark

    The second in a series of three curriculum packages on wiring, these materials for a five-unit course were developed to prepare postsecondary students for entry-level employment in the residential wiring trade. The five units are: (1) blueprint reading and load calculations; (2) rough-in; (3) service; (4) trim out and troubleshooting; and (5) load…

  6. Wire chamber

    DOEpatents

    Atac, Muzaffer

    1989-01-01

    A wire chamber or proportional counter device, such as Geiger-Mueller tube or drift chamber, improved with a gas mixture providing a stable drift velocity while eliminating wire aging caused by prior art gas mixtures. The new gas mixture is comprised of equal parts argon and ethane gas and having approximately 0.25% isopropyl alcohol vapor.

  7. 23 CFR 140.907 - Overhead and indirect construction costs.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... which assure proper control and distribution of the overhead and indirect construction costs. ... 23 Highways 1 2012-04-01 2012-04-01 false Overhead and indirect construction costs. 140.907... REIMBURSEMENT Reimbursement for Railroad Work § 140.907 Overhead and indirect construction costs. (a) A...

  8. 30 CFR 56.14108 - Overhead drive belts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Overhead drive belts. 56.14108 Section 56.14108 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Safety Devices and Maintenance Requirements § 56.14108 Overhead drive belts. Overhead drive belts...

  9. 30 CFR 57.14108 - Overhead drive belts.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Overhead drive belts. 57.14108 Section 57.14108 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Equipment Safety Devices and Maintenance Requirements § 57.14108 Overhead drive belts. Overhead drive...

  10. 30 CFR 56.14108 - Overhead drive belts.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Overhead drive belts. 56.14108 Section 56.14108 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Safety Devices and Maintenance Requirements § 56.14108 Overhead drive belts. Overhead drive belts...

  11. 30 CFR 56.14108 - Overhead drive belts.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Overhead drive belts. 56.14108 Section 56.14108 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Safety Devices and Maintenance Requirements § 56.14108 Overhead drive belts. Overhead drive belts...

  12. 30 CFR 57.14108 - Overhead drive belts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Overhead drive belts. 57.14108 Section 57.14108 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Equipment Safety Devices and Maintenance Requirements § 57.14108 Overhead drive belts. Overhead drive...

  13. 30 CFR 56.14108 - Overhead drive belts.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Overhead drive belts. 56.14108 Section 56.14108 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Safety Devices and Maintenance Requirements § 56.14108 Overhead drive belts. Overhead drive belts...

  14. 30 CFR 57.14108 - Overhead drive belts.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Overhead drive belts. 57.14108 Section 57.14108 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Equipment Safety Devices and Maintenance Requirements § 57.14108 Overhead drive belts. Overhead drive...

  15. 30 CFR 57.14108 - Overhead drive belts.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Overhead drive belts. 57.14108 Section 57.14108 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Equipment Safety Devices and Maintenance Requirements § 57.14108 Overhead drive belts. Overhead drive...

  16. 30 CFR 57.14108 - Overhead drive belts.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Overhead drive belts. 57.14108 Section 57.14108 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Equipment Safety Devices and Maintenance Requirements § 57.14108 Overhead drive belts. Overhead drive...

  17. 30 CFR 56.14108 - Overhead drive belts.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Overhead drive belts. 56.14108 Section 56.14108 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Safety Devices and Maintenance Requirements § 56.14108 Overhead drive belts. Overhead drive belts...

  18. Human Factors Engineering Guidelines for Overhead Cranes

    NASA Technical Reports Server (NTRS)

    Chandler, Faith; Delgado, H. (Technical Monitor)

    2001-01-01

    This guideline provides standards for overhead crane cabs that can be applied to the design and modification of crane cabs to reduce the potential for human error due to design. This guideline serves as an aid during the development of a specification for purchases of cranes or for an engineering support request for crane design modification. It aids human factors engineers in evaluating existing cranes during accident investigations or safety reviews.

  19. Shoulder Injuries in the Overhead Throwing Athlete.

    PubMed

    Mlynarek, Ryan A; Lee, Simon; Bedi, Asheesh

    2017-02-01

    The overhead pitching motion is a coordinated sequence of movements that subjects the shoulder to extreme forces. The ultimate goal of this complex, dynamic activity is to generate high ball velocity and accuracy. In doing so, repetitive throwing can cause adaptive and pathologic changes in the thrower's shoulder. This article reviews the relevant shoulder anatomy, the kinetic chain, and throwing mechanics, as well as common shoulder injuries and surgical options for the treating orthopedic surgeon.

  20. Wire insulation defect detector

    NASA Technical Reports Server (NTRS)

    Greulich, Owen R. (Inventor)

    2004-01-01

    Wiring defects are located by detecting a reflected signal that is developed when an arc occurs through the defect to a nearby ground. The time between the generation of the signal and the return of the reflected signal provides an indication of the distance of the arc (and therefore the defect) from the signal source. To ensure arcing, a signal is repeated at gradually increasing voltages while the wire being tested and a nearby ground are immersed in a conductive medium. In order to ensure that the arcing occurs at an identifiable time, the signal whose reflection is to be detected is always made to reach the highest potential yet seen by the system.

  1. Wire Wise.

    ERIC Educational Resources Information Center

    Swanquist, Barry

    1998-01-01

    Discusses how today's technology is encouraging schools to invest in furnishings that are adaptable to computer use and telecommunications access. Explores issues concerning modularity, wiring management, ergonomics, durability, price, and aesthetics. (GR)

  2. Ground and flight test experience with a triple redundant digital fly by wire control system. [installed in F-8C aircraft

    NASA Technical Reports Server (NTRS)

    Jarvis, C. R.; Szalai, K. J.

    1981-01-01

    A triplex digital fly by wire flight control system was developed and installed in an F-8C aircraft to provide fail operative, full authority control. Hardware and software redundancy management techniques were designed to detect and identify failures in the system. Control functions typical of those projected for future actively controlled vehicles were implemented.

  3. Brake-By-Wire Program

    DTIC Science & Technology

    2006-05-31

    SUPPLEMENTARY NOTES Report contains color. 14. ABSTRACT Two design iterations for electric calipers and two systems (full brake by wire and hybrid brakes ...were developed for use on a ground vehicle. The program demonstrated a fully integrated electric caliper and full brake -by-wire system on a sports...release. Project Context The development of an electric brake caliper and associated systems for automotive application represented a significant

  4. 24 CFR 3280.809 - Grounding.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... shall be grounded through the green-colored conductor in the supply cord or the feeder wiring to the... grounding means. (1) The green-colored grounding wire in the supply cord or permanent feeder wiring shall be... metallic roof and exterior covering shall be considered bonded if (i) the metal panels overlap one...

  5. 24 CFR 3280.809 - Grounding.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... shall be grounded through the green-colored conductor in the supply cord or the feeder wiring to the... grounding means. (1) The green-colored grounding wire in the supply cord or permanent feeder wiring shall be... metallic roof and exterior covering shall be considered bonded if (i) the metal panels overlap one...

  6. 24 CFR 3280.809 - Grounding.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... shall be grounded through the green-colored conductor in the supply cord or the feeder wiring to the... grounding means. (1) The green-colored grounding wire in the supply cord or permanent feeder wiring shall be... metallic roof and exterior covering shall be considered bonded if (i) the metal panels overlap one...

  7. 24 CFR 3280.809 - Grounding.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... shall be grounded through the green-colored conductor in the supply cord or the feeder wiring to the... grounding means. (1) The green-colored grounding wire in the supply cord or permanent feeder wiring shall be... metallic roof and exterior covering shall be considered bonded if (i) the metal panels overlap one...

  8. 24 CFR 3280.809 - Grounding.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... shall be grounded through the green-colored conductor in the supply cord or the feeder wiring to the... grounding means. (1) The green-colored grounding wire in the supply cord or permanent feeder wiring shall be... metallic roof and exterior covering shall be considered bonded if (i) the metal panels overlap one...

  9. Wire recycling for quantum circuit optimization

    NASA Astrophysics Data System (ADS)

    Paler, Alexandru; Wille, Robert; Devitt, Simon J.

    2016-10-01

    Quantum information processing is expressed using quantum bits (qubits) and quantum gates which are arranged in terms of quantum circuits. Here, each qubit is associated with a quantum circuit wire which is used to conduct the desired operations. Most of the existing quantum circuits allocate a single quantum circuit wire for each qubit and hence introduce significant overhead. In fact, qubits are usually not needed during the entire computation, only between their initialization and measurement. Before and after that, corresponding wires may be used by other qubits. In this work, we propose a solution which exploits this fact in order to optimize the design of quantum circuits with respect to the required wires. To this end, we introduce a representation of the lifetimes of all qubits which is used to analyze the respective need for wires. Based on this analysis, a method is proposed which "recycles" the available wires and, as a result, reduces the size of the resulting circuit. Numerical tests based on established reversible and fault-tolerant quantum circuits confirm that the proposed solution reduces the number of wires by more than 90% compared to unoptimized quantum circuits.

  10. Claims for Unabsorbed Overhead on Defense Contracts.

    DTIC Science & Technology

    1985-09-01

    increase overhead costs" (7:20). In a concurring opinion, Administrative Judge Lieblich makes a couple of points very clear: (1) as far as this Board is...method of calculating these coats C7:13. Judge Lieblich than goes on to qualify his seemingly strong words about the "Eichleay" formula. He states...BCA, 83-2: 1-32 and (1-2 of Concurring opinio-f Judge Lieblich ) (17 February 1983). 8. Capital Electric co. vs. The United States, No. 83-965, CAFC: 1

  11. Electrical and mechanical design criteria for EHV and UHV: overhead transmission lines

    SciTech Connect

    Not Available

    1980-06-01

    The results are presented of a program devoted to the selection of electrical and mechanical design criteria and parameters for overhead power transmission lines for ac systems rated at from 345 to 1100 kV and for dc systems rated at from 600 to 1200 kV. Information is included on the environmental effects, i.e., audible noise and electric fields, of the lines, mechanical and economic requirements, safety, failures, grounding, and lightning protection. (LCL)

  12. 29 CFR 1910.304 - Wiring design and protection.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... single-phase, three-wire system shall be grounded; (iii) The common conductor of a multiphase system having one wire common to all phases shall be grounded; (iv) One phase conductor of a multiphase system... grounded cold water pipe near the equipment if the extension was installed before August 13, 2007. When...

  13. 29 CFR 1910.304 - Wiring design and protection.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... single-phase, three-wire system shall be grounded; (iii) The common conductor of a multiphase system having one wire common to all phases shall be grounded; (iv) One phase conductor of a multiphase system... grounded cold water pipe near the equipment if the extension was installed before August 13, 2007. When...

  14. 29 CFR 1910.304 - Wiring design and protection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... single-phase, three-wire system shall be grounded; (iii) The common conductor of a multiphase system having one wire common to all phases shall be grounded; (iv) One phase conductor of a multiphase system... grounded cold water pipe near the equipment if the extension was installed before August 13, 2007. When...

  15. Troubleshooting crude vacuum tower overhead ejector systems

    SciTech Connect

    Lines, J.R.; Frens, L.L. )

    1995-03-01

    Routinely surveying tower overhead vacuum systems can improve performance and product quality. These vacuum systems normally provide reliable and consistent operation. However, process conditions, supplied utilities, corrosion, erosion and fouling all have an impact on ejector system performance. Refinery vacuum distillation towers use ejector systems to maintain tower top pressure and remove overhead gases. However, as with virtually all refinery equipment, performance may be affected by a number of variables. These variables may act independently or concurrently. It is important to understand basic operating principles of vacuum systems and how performance is affected by: utilities, corrosion and erosion, fouling, and process conditions. Reputable vacuum-system suppliers have service engineers that will come to a refinery to survey the system and troubleshoot performance or offer suggestions for improvement. A skilled vacuum-system engineer may be needed to diagnose and remedy system problems. The affect of these variables on performance is discussed. A case history is described of a vacuum system on a crude tower in a South American refinery.

  16. Mechanics and pathomechanics in the overhead athlete.

    PubMed

    Kibler, W Ben; Wilkes, Trevor; Sciascia, Aaron

    2013-10-01

    Optimal performance of the overhead throwing task requires precise mechanics that involve coordinated kinetic and kinematic chains to develop, transfer, and regulate the forces the body needs to withstand the inherent demands of the task and to allow optimal performance. These chains have been evaluated and the basic components, called nodes, have been identified. Impaired performance and/or injury, the DTS, is associated with alterations in the mechanics that are called pathomechanics. They can occur at multiple locations throughout the kinetic chain. They must be evaluated and treated as part of the overall problem. Observational analysis of the mechanics and pathomechanics using the node analysis method can be useful in highlighting areas of alteration that can be evaluated for anatomic injury or altered physiology. The comprehensive kinetic chain examination can evaluate sites of kinetic chain breakage, and a detailed shoulder examination can assess joint internal derangement of altered physiology that may contribute to the pathomechanics. Treatment of the DTS should be comprehensive, directed toward restoring physiology and mechanics and optimizing anatomy. This maximizes the body’s ability to develop normal mechanics to accomplish the overhead throwing task.

  17. Overhead analysis of universal concatenated quantum codes

    NASA Astrophysics Data System (ADS)

    Chamberland, Christopher; Jochym-O'Connor, Tomas; Laflamme, Raymond

    2017-02-01

    We analyze the resource overhead of recently proposed methods for universal fault-tolerant quantum computation using concatenated codes. Namely, we examine the concatenation of the 7-qubit Steane code with the 15-qubit Reed-Muller code, which allows for the construction of the 49- and 105-qubit codes that do not require the need for magic state distillation for universality. We compute a lower bound for the adversarial noise threshold of the 105-qubit code and find it to be 8.33 ×10-6. We obtain a depolarizing noise threshold for the 49-qubit code of 9.69 ×10-4 which is competitive with the 105-qubit threshold result of 1.28 ×10-3 . We then provide lower bounds on the resource requirements of the 49- and 105-qubit codes and compare them with the surface code implementation of a logical T gate using magic state distillation. For the sampled input error rates and noise model, we find that the surface code achieves a smaller overhead compared to our concatenated schemes.

  18. Shoulder Pain in the Overhead Throwing Athlete

    PubMed Central

    Seroyer, Shane T.; Nho, Shane J.; Bach, Bernard R.; Bush-Joseph, Charles A.; Nicholson, Gregory P.; Romeo, Anthony A.

    2009-01-01

    Treatment of the overhead throwing athlete is among the more challenging aspects of orthopaedic sports medicine. Awareness and understanding of the throwing motion and the supraphysiologic forces to which the structures of the shoulder are subjected are essential to diagnosis and treatment. Pain and dysfunction in the throwing shoulder may be attributed to numerous etiologies, including scapular dysfunction, intrinsic glenohumeral pathology (capsulolabral structures), extrinsic musculature (rotator cuff), or neurovascular structures. Attention to throwing mechanics and appropriate stretching, strength, and conditioning programs may reduce the risk of injury in this highly demanding activity. Early discovery of symptoms, followed by conservative management with rest and rehabilitation with special attention to retraining mechanics may mitigate the need for surgical intervention. Prevention of injury is always more beneficial to the long-term health of the thrower than is surgical repair. An anatomic approach is used in this report, focusing on common etiologies of pain in the overhead thrower and emphasizing the clinical presentation and treatment. PMID:23015861

  19. Method of locating ground faults

    NASA Astrophysics Data System (ADS)

    Patterson, Richard L.; Rose, Allen H.; Cull, Ronald C.

    1994-11-01

    The present invention discloses a method of detecting and locating current imbalances such as ground faults in multiwire systems using the Faraday effect. As an example, for 2-wire or 3-wire (1 ground wire) electrical systems, light is transmitted along an optical path which is exposed to magnetic fields produced by currents flowing in the hot and neutral wires. The rotations produced by these two magnetic fields cancel each other, therefore light on the optical path does not read the effect of either. However, when a ground fault occurs, the optical path is exposed to a net Faraday effect rotation due to the current imbalance thereby exposing the ground fault.

  20. No Wires.

    ERIC Educational Resources Information Center

    DeLoughry, Thomas J.

    1995-01-01

    The University of California at Santa Cruz has completed a successful test of a wireless computer network that would enable students and professors to get on line from anywhere on campus. The network, linked by radio waves, could save millions of dollars in campus wiring costs and would better meet student and faculty information needs. (MSE)

  1. 23. OVERALL OVERHEAD VIEW OF MARISCAL WORKS LOOKING NORTH, NORTHEAST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. OVERALL OVERHEAD VIEW OF MARISCAL WORKS LOOKING NORTH, NORTHEAST. NOTICE REDWOOD TANK PLATFORM LOWER RIGHT FOREGROUND. - Mariscal Quicksilver Mine & Reduction Works, Terlingua, Brewster County, TX

  2. Add-On Shielding for Unshielded Wire

    NASA Technical Reports Server (NTRS)

    Koenig, J. C.; Billitti, J. W.; Tallon, J. M.

    1983-01-01

    Fabrication sequence used to produce compact shields slipped into place from free ends of wires already soldered into connectors at other ends. Single shields are formed into harnesses by connecting grounding jumpers. Technique is especially useful for small diameter wire attached to microminiature connectors.

  3. Physical examination of the overhead athlete's shoulder.

    PubMed

    Sewick, Amy; Kelly, John D; Rubin, Ben

    2012-03-01

    Overhead athletes seek the services of an orthopedic surgeon because of pain and/or dysfunction. It is important to address the cause of the symptoms more so than the source of the patient's pain, so that treatment will eliminate the problem rather than merely ameliorate symptoms temporarily. In order to accomplish a thorough assessment of shoulder function, the examiner must expand his/her view from isolated assessment of the glenohumeral joint range of motion, stability, assessment of rotator cuff strength, palpation and provocative maneuvers, and add assessment of the shoulder in the context of the kinetic chain. The examination of the thrower's shoulder, coupled with a thorough history, will usually provide a solid functional diagnosis and provide a good idea as to the presence of structural damage. As a result, the value of rehabilitation and the benefit of surgical intervention are made more predictable.

  4. Low-overhead accrual failure detector.

    PubMed

    Ren, Xiao; Dong, Jian; Liu, Hongwei; Li, Yang; Yang, Xiaozong

    2012-01-01

    Failure detectors are one of the fundamental components for building a distributed system with high availability. In order to maintain the efficiency and scalability of failure detection in a complicated large-scale distributed system, accrual failure detectors that can adapt to multiple applications have been studied extensively. In this paper, an new accrual failure detector--LA-FD with low system overhead has been proposed specifically for current mobile network equipment on the Internet whose processing power, memory space and power supply are all constrained. It does not rely on the probability distribution of message transmission time, or on the maintenance of a history message window. By simple calculation, LA-FD provides adaptive failure detection service with high accuracy to multiple upper applications. The related experiments and results have also been presented.

  5. NIOSH alert: Request for assistance in preventing electrocutions of crane operators and crew members working near overhead power lines

    SciTech Connect

    1995-05-01

    In this alert, NIOSH warned that crane operators and crew members may be electrocuted when working near overhead power lines. Five cases were described which resulted in six electrocutions. Case 1 involved a 29 year old who pushed the crane cable on a 1 yard cement bucket into a 7,200 volt power line. Case 2 involved a 33 year old well driller who was electrocuted when a metal pipe lifted by a truck mounted crane contacted a 12,000 volt overhead power line. The third case involved a 24 year old forman for a telecommunications company who was electrocuted when he grabbed the door handle of a truck mounted crane whose boom was in contact with a 7,200 volt overhead power line. Case 4 involved a 37 year old construction laborer electrocuted while pulling a wire rope attached to a crane cable toward a load. The fifth case involved a 20 year old male truck driver and his 70 year old male employer who were electrocuted when the boom of a truck mounted crane contacted a 7,200 volt conductor of an overhead power line.

  6. 1. EAST SIDE OF OVERHEAD BOMB TRANSPORT RACK, WITH BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. EAST SIDE OF OVERHEAD BOMB TRANSPORT RACK, WITH BUILDING 343 AT LEFT AND BUILDING 328 AT RIGHT. VIEW TO WEST. - Rocky Mountain Arsenal, Overhead Bomb Transport Rack, 1580 feet South of December Seventh Avenue; 860 feet West of D Street, Commerce City, Adams County, CO

  7. Precision wire feeder for small diameter wire

    DOEpatents

    Brandon, E.D.; Hooper, F.M.; Reichenbach, M.L.

    1992-08-11

    A device for feeding small diameter wire having a diameter less than 0.04 mm (16 mil) to a welding station includes a driving wheel for controllably applying a non-deforming driving force to the wire to move the free end of the wire towards the welding station; and a tension device such as a torque motor for constantly applying a reverse force to the wire in opposition to the driving force to keep the wire taut. 1 figure.

  8. Precision wire feeder for small diameter wire

    DOEpatents

    Brandon, Eldon D.; Hooper, Frederick M.; Reichenbach, Marvin L.

    1992-01-01

    A device for feeding small diameter wire having a diameter less than 0.04 mm (16 mil) to a welding station includes a driving wheel for controllably applying a non-deforming driving force to the wire to move the free end of the wire towards the welding station; and a tension device such as a torque motor for constantly applying a reverse force to the wire in opposition to the driving force to keep the wire taut.

  9. Non-contact measurement of contact wire

    NASA Astrophysics Data System (ADS)

    Yi, Yaxing; Ye, Xuemei; Li, Zhongke; Yue, Kaiduan

    2008-12-01

    The overhead contact system is the power supply unit of the electric locomotive. This article is to introduce our newly developed method to measure the height and pull out value of the contact wire. A carema dolly which can move on railway is applied to bear the weight of the measure equipment; two linear CCD cameras are installed on the dolly symmetrically about the midline of two rails. While the dolly move along the railway, two CCD cameras grasp the image synchronously, and a computer real-time process the images, the height and pull out value can be calculate out from the images.

  10. Wire Retrieves Broken Pin

    NASA Technical Reports Server (NTRS)

    Burow, G. H.

    1984-01-01

    Safety wire retains pieces of broken tool. Retrieval wire running through shaft of tool used to pull pieces of tool out of hole, should tool break during use. Safety wire concept suitable for pins subject to deflection or breakage.

  11. Overhead View of Area Surrounding Pathfinder

    NASA Technical Reports Server (NTRS)

    1997-01-01

    Overhead view of the area surrounding the Pathfinder lander illustrating the Sojourner traverse. Red rectangles are rover positions at the end of sols 1-30. Locations of soil mechanics experiments, wheel abrasion experiments, and APXS measurements are shown. The A numbers refer to APXS measurements as discussed in the paper by Rieder et al. (p. 1770, Science Magazine, see image note). Coordinates are given in the LL frame.

    The photorealistic, interactive, three-dimensional virtual reality (VR) terrain models were created from IMP images using a software package developed for Pathfinder by C. Stoker et al. as a participating science project. By matching features in the left and right camera, an automated machine vision algorithm produced dense range maps of the nearfield, which were projected into a three-dimensional model as a connected polygonal mesh. Distance and angle measurements can be made on features viewed in the model using a mouse-driven three-dimensional cursor and a point-and-click interface. The VR model also incorporates graphical representations of the lander and rover and the sequence and spatial locations at which rover data were taken. As the rover moved, graphical models of the rover were added for each position that could be uniquely determined using stereo images of the rover taken by the IMP. Images taken by the rover were projected into the model as two-dimensional 'billboards' to show the proper perspective of these images.

    NOTE: original caption as published in Science Magazine

    Mars Pathfinder is the second in NASA's Discovery program of low-cost spacecraft with highly focused science goals. The Jet Propulsion Laboratory, Pasadena, CA, developed and manages the Mars Pathfinder mission for NASA's Office of Space Science, Washington, D.C. JPL is a division of the California Institute of Technology (Caltech).

  12. Automated wire preparation system

    NASA Astrophysics Data System (ADS)

    McCulley, Deborah J.

    The first step toward an automated wire harness facility for the aerospace industry has been taken by implementing the Wire Vektor 2000 into the wire harness preparation area. An overview of the Wire Vektor 2000 is given, including the facilities for wire cutting, marking, and transporting, for wire end processing, and for system control. Production integration in the Wire Vektor 2000 system is addressed, considering the hardware/software debug system and the system throughput. The manufacturing changes that have to be made in implementing the Wire Vektor 2000 are discussed.

  13. Gasoline engine with single overhead camshaft having duel exhaust cams per cylinder wherein each exhaust cam has duel lobes

    SciTech Connect

    Taguma, K.

    1991-03-19

    This patent describes an improved gasoline engine using a spark plug and a spark plug wire. It comprises a cylinder having a cylinder wall and an upper end; a piston movably disposed within the cylinder; a gasoline injector for supplying the gasoline charge into the cylinder; a single tube exhaust valve movably mounted to the cylinder; a single overhead camshaft having duel exhaust came for the cylinder with each exhaust cam having duel exhaust lobes; and port holes contained in the cylinder around the cylinder wall in a ring-like fashion.

  14. Looking north toward unit 1 pump motor, overhead crane, and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Looking north toward unit 1 pump motor, overhead crane, and double folding doors on the north side of the building - Wellton-Mohawk Irrigation System, Pumping Plant No. 2, Bounded by Interstate 8 to south, Wellton, Yuma County, AZ

  15. Interior view of main section of milk barn. Opening overhead ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior view of main section of milk barn. Opening overhead leads to attic crawl space. Camera is pointed SW. - Kosai Farm, Milk Barn, B Street north of Northwest Twenty-ninth Street, Auburn, King County, WA

  16. INTERIOR VIEW, SETTING LARGE CORE WITH ASSISTANCE FROM THE OVERHEAD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    INTERIOR VIEW, SETTING LARGE CORE WITH ASSISTANCE FROM THE OVERHEAD RAIL CRANE IN BOX FLOOR MOLD AREA (WORKERS: DAN T. WELLS AND TRUMAN CARLISLE). - Stockham Pipe & Fittings Company, Ductile Iron Foundry, 4000 Tenth Avenue North, Birmingham, Jefferson County, AL

  17. 12. Interior view, grain tanks (bins). Profile view of overhead ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Interior view, grain tanks (bins). Profile view of overhead (fill) conveyor gallery bridge extending through tops of tanks just below roofs. - Saint Anthony Elevator No. 3, 620 Malcom Avenue, Southeast, Minneapolis, Hennepin County, MN

  18. 35. OVERHEAD VIEW OF VIVIANNA WORKS ORE BIN LOOKING NORTHEAST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. OVERHEAD VIEW OF VIVIANNA WORKS ORE BIN LOOKING NORTHEAST. GENERATOR BUILDING TOP LEFT, OFFICE AND STOREROOM TOP CENTER, ROTARY KILN AND CONDENSER PLATFORM RIGHT. - Mariscal Quicksilver Mine & Reduction Works, Terlingua, Brewster County, TX

  19. OVERHEAD VIEW OF VIVIANNA WORKS ORE BIN LOOKING NORTHEAST. GENERATOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    OVERHEAD VIEW OF VIVIANNA WORKS ORE BIN LOOKING NORTHEAST. GENERATOR BUILDING TOP LEFT, OFFICE AND STOREROOM TOP CENTER, ROTARY KILN AND CONDENSER PLATFORM RIGHT. - Mariscal Quicksilver Mine & Reduction Works, Terlingua, Brewster County, TX

  20. 24. OVERHEAD VIEW OF MARISCAL WORKS ORE BIN FOUNDATION AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. OVERHEAD VIEW OF MARISCAL WORKS ORE BIN FOUNDATION AND CONDENSERS, TOWARD WHERE ORE DELIVERY TRACK WOULD HAVE RUN, LOOKING NORTHEAST. - Mariscal Quicksilver Mine & Reduction Works, Terlingua, Brewster County, TX

  1. OVERHEAD VIEW OF MARISCAL WORKS ORE BIN FOUNDATION AND CONDENSERS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    OVERHEAD VIEW OF MARISCAL WORKS ORE BIN FOUNDATION AND CONDENSERS, TOWARD WHERE ORE DELIVERY TRACK WOULD HAVE RUN, LOOKING NORTHEAST. - Mariscal Quicksilver Mine & Reduction Works, Terlingua, Brewster County, TX

  2. GENERAL OVERHEAD VIEW OF MARISCAL WORKS, SHOWING ORE BIN, LEFT, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    GENERAL OVERHEAD VIEW OF MARISCAL WORKS, SHOWING ORE BIN, LEFT, CONDENSERS, CENTER, AND CIRCULAR REDWOOD TANK PLATFORMS, RIGHT, LOOKING EAST, NORTHEAST. - Mariscal Quicksilver Mine & Reduction Works, Terlingua, Brewster County, TX

  3. 22. GENERAL OVERHEAD VIEW OF MARISCAL WORKS, SHOWING ORE BIN, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. GENERAL OVERHEAD VIEW OF MARISCAL WORKS, SHOWING ORE BIN, LEFT, CONDENSERS, CENTER, AND CIRCULAR REDWOOD TANK PLATFORMS, RIGHT, LOOKING EAST, NORTHEAST. - Mariscal Quicksilver Mine & Reduction Works, Terlingua, Brewster County, TX

  4. 28. SHOWER AND URINALS, OVERHEAD TOILET STRUCTURE ABOVE ROOF PANEL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. SHOWER AND URINALS, OVERHEAD TOILET STRUCTURE ABOVE ROOF PANEL STORAGE AREA. VIEW TO SOUTH-SOUTHWEST. - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA

  5. 27. OVERHEAD TOILET, SHOWER, CHANGE ROOM STRUCTURE. VIEW TO NORTHNORTHEAST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. OVERHEAD TOILET, SHOWER, CHANGE ROOM STRUCTURE. VIEW TO NORTH-NORTHEAST. - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA

  6. 16. VIEW OF OVERHEAD DOOR TO HOP DRYER NO. 3. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. VIEW OF OVERHEAD DOOR TO HOP DRYER NO. 3. ALL EIGHT HOP DRYERS ARE ON THE SECOND FLOOR. - James W. Seavey Hop Driers, 0.6 mile East from junction of Highway 99 & Alexander Avenue, Corvallis, Benton County, OR

  7. 9. VIEW SOUTH OF TURBINE ROOM INTERIOR, WITH OVERHEAD CRANE; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. VIEW SOUTH OF TURBINE ROOM INTERIOR, WITH OVERHEAD CRANE; ABANDONED ARMATURES IN CENTER FOREGROUND; BUS PANEL REMAINS AT LOWER RIGHT CENTER - Turners Falls Power & Electric Company, Hampden Station, East bank of Connecticut River, Chicopee, Hampden County, MA

  8. New rain shed (Building No. 241), overhead pipeline and raw ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    New rain shed (Building No. 241), overhead pipeline and raw water tank T4. Distribution pump house can be seen at the center of building. - Hawaii Volcanoes National Park Water Collection System, Hawaii Volcanoes National Park, Volcano, Hawaii County, HI

  9. 2. OVERHEAD CHEMICAL PROCESS PIPING BETWEEN BUILDINGS 422, ON RIGHT, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. OVERHEAD CHEMICAL PROCESS PIPING BETWEEN BUILDINGS 422, ON RIGHT, AND 431, ON LEFT. - Rocky Mountain Arsenal, Crude Mustard & Aldrin Manufacturing, 1200 feet South of December Seventh Avenue; 600 feet East of D Street, Commerce City, Adams County, CO

  10. 59. SECOND FLOOR, STEEL OVERHEAD CONVEYOR SUPPORT FRAMEWORK ABUTTING FOOTBRIDGE, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    59. SECOND FLOOR, STEEL OVERHEAD CONVEYOR SUPPORT FRAMEWORK ABUTTING FOOTBRIDGE, BAY 18, TO SOUTHEAST - Ford Motor Company Edgewater Assembly Plant, Assembly Building, 309 River Road, Edgewater, Bergen County, NJ

  11. Southeast corner with overhead crane in foreground Bureau of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Southeast corner with overhead crane in foreground - Bureau of Mines Boulder City Experimental Station, Titanium Development Plant, Date Street north of U.S. Highway 93, Boulder City, Clark County, NV

  12. Detail, east side, north end, showing door and overhead rail ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Detail, east side, north end, showing door and overhead rail for refrigeration room. - Fitzsimons General Hospital, Ice Plant, Southwest Corner of East I Avenue & North Thirteenth Street, Aurora, Adams County, CO

  13. 7. VIEW SHOWING EAST ELEVATION OF OVERHEAD BRIDGE CONNECTING NAPPING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. VIEW SHOWING EAST ELEVATION OF OVERHEAD BRIDGE CONNECTING NAPPING BUILDING (LEFT) WITH CLOTH ROOM (RIGHT), LOOKING WEST - Massachusetts Mills, Cloth Room-Section 15, 95 Bridge Street, Lowell, Middlesex County, MA

  14. Overhead Projector Demonstrations: A Classroom Demonstration of Aliphatic Substitution.

    ERIC Educational Resources Information Center

    Perina, Ivo; Mihanovic, Branka

    1989-01-01

    Presents a halogen substitution of an alkane using a compartmentalized Petri dish or Conway dish on an overhead projector. Provides methodology and several modifications for different reactions. Uses hexane, methyl orange, bromine, and silver nitrate. (MVL)

  15. Childhood cancer and overhead powerlines: a case-control study.

    PubMed Central

    Myers, A.; Clayden, A. D.; Cartwright, R. A.; Cartwright, S. C.

    1990-01-01

    A case-control study has been carried out to examine the occurrence of childhood cancer in relation to the proximity of overhead power lines to a child's home address at birth and to the calculated magnetic field at the address. The study included 374 cases diagnosed in the Yorkshire Health Region between 1970 and 1979, together with 588 matched controls. Magnetic-field strengths at the birth addresses due to the load currents of overhead power lines were calculated on the basis of line-network maps and load records. The results indicate no association between the occurrence of childhood malignancies and either the proximity or the magnetic fields of overhead lines, although the statistical power of the study was limited by the small numbers of children living close to overhead power lines. PMID:2257204

  16. Overhead Projector Demonstrations: Tilted TOPS: Inclined Plane Projection.

    ERIC Educational Resources Information Center

    Alyea, Hubert N.

    1989-01-01

    The construction and uses of a device to facilitate the use of an overhead projector to show chemical reactions is presented. Materials and instructions for construction as well as reactor vessels are discussed. (CW)

  17. INTERIOR VIEW OF SHED, SHOWING STRUCTURAL SYSTEM AND OVERHEAD DOOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    INTERIOR VIEW OF SHED, SHOWING STRUCTURAL SYSTEM AND OVERHEAD DOOR MOUNTING, LOOKING NORTHEAST - Marvine Colliery, Shed, West side Boulevard Avenue, between East Parker Street & Route 380, Scranton, Lackawanna County, PA

  18. WEST ELEVATION, CAMERA FACING EAST. THE OVERHEAD PIPES ARE FOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    WEST ELEVATION, CAMERA FACING EAST. THE OVERHEAD PIPES ARE FOR DISTRIBUTING STEAM FROM THE NEARBY HEATING PLANT TO VARIOUS PARTS OF THE COMPLEX. - New Haven Rail Yard, Oil Storage Building, Vicinity of Union Avenue, New Haven, New Haven County, CT

  19. 13. TURNING DEVICE SUSPENDED FROM, AND LIFTED BY THE OVERHEAD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. TURNING DEVICE SUSPENDED FROM, AND LIFTED BY THE OVERHEAD CRANE SYSTEM EAST OF No. 1 PRESS. - U.S. Steel Homestead Works, Press Shop No. 1, Along Monongahela River, Homestead, Allegheny County, PA

  20. 7. Ball mill area and second level entry with overhead ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Ball mill area and second level entry with overhead crane in background - Bureau of Mines Boulder City Experimental Station, Ore Dressing Pilot Plant, Date Street north of U.S. Highway 93, Boulder City, Clark County, NV

  1. 16. THE INSTALLATION OF CONVEYORS AND OVERHEAD RAILS ELIMINATED THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. THE INSTALLATION OF CONVEYORS AND OVERHEAD RAILS ELIMINATED THE NEED TO LAY MOLDS OUT ON FLOORS AND HAND-POUR THEM. INSTEAD, WORKERS PULLED LARGE LADLES ALONG OVERHEAD RAILS AND FILLED CONVEYOR-DRIVEN MOLDS WHILE THEY STOOD ON A MOVING PLATFORM THAT TRAVELED AT THE SAME SPEED AS THE MOLD CONVEYOR, CA. 1950. - Stockham Pipe & Fittings Company, 4000 Tenth Avenue North, Birmingham, Jefferson County, AL

  2. Shoulder problems in overhead sports. Part I - biomechanics of throwing.

    PubMed

    Kaczmarek, Piotr Krzysztof; Lubiatowski, Przemysław; Cisowski, Paweł; Grygorowicz, Monika; Łepski, Marcin; Długosz, Jan; Ogrodowicz, Piotr; Dudziński, Witold; Nowak, Maciej; Romanowski, Leszek

    2014-05-15

    The article discusses the biomechanical processes that occur during an overhead throw. This activity is highly specialized and requires full and proper function from the shoulder joint. It consists of active and passive stabilization and synchronous work of the accelerating and decelerating muscles. The process of the overhead throw can be divided into several phases that differ from each other in biomechanical parameters and involvement of specific muscles.

  3. Computer-based mechanical design of overhead lines

    NASA Astrophysics Data System (ADS)

    Rusinaru, D.; Bratu, C.; Dinu, R. C.; Manescu, L. G.

    2016-02-01

    Beside the performance, the safety level according to the actual standards is a compulsory condition for distribution grids’ operation. Some of the measures leading to improvement of the overhead lines reliability ask for installations’ modernization. The constraints imposed to the new lines components refer to the technical aspects as thermal stress or voltage drop, and look for economic efficiency, too. The mechanical sizing of the overhead lines is after all an optimization problem. More precisely, the task in designing of the overhead line profile is to size poles, cross-arms and stays and locate poles along a line route so that the total costs of the line's structure to be minimized and the technical and safety constraints to be fulfilled.The authors present in this paper an application for the Computer-Based Mechanical Design of the Overhead Lines and the features of the corresponding Visual Basic program, adjusted to the distribution lines. The constraints of the optimization problem are adjusted to the existing weather and loading conditions of Romania. The outputs of the software application for mechanical design of overhead lines are: the list of components chosen for the line: poles, cross-arms, stays; the list of conductor tension and forces for each pole, cross-arm and stay for different weather conditions; the line profile drawings.The main features of the mechanical overhead lines design software are interactivity, local optimization function and high-level user-interface

  4. Comparison of Analysis, Simulation, and Measurement of Wire-to-Wire Crosstalk. Part 1

    NASA Technical Reports Server (NTRS)

    Bradley, Arthur T.; Yavoich, Brian James; Hodson, Shame M.; Godley, Richard Franklin

    2010-01-01

    In this investigation, we compare crosstalk analysis, simulation, and measurement results for electrically short configurations. Methods include hand calculations, PSPICE simulations, Microstripes transient field solver, and empirical measurement. In total, four representative physical configurations are examined, including a single wire over a ground plane, a twisted pair over a ground plane, generator plus receptor wires inside a cylindrical conduit, and a single receptor wire inside a cylindrical conduit. Part 1 addresses the first two cases, and Part 2 addresses the final two. Agreement between the analysis, simulation, and test data is shown to be very good.

  5. Comparison of Analysis, Simulation, and Measurement of Wire-to-Wire Crosstalk. Part 2

    NASA Technical Reports Server (NTRS)

    Bradley, Arthur T.; Yavoich, Brian James; Hodson, Shane M.; Godley, Franklin

    2010-01-01

    In this investigation, we compare crosstalk analysis, simulation, and measurement results for electrically short configurations. Methods include hand calculations, PSPICE simulations, Microstripes transient field solver, and empirical measurement. In total, four representative physical configurations are examined, including a single wire over a ground plane, a twisted pair over a ground plane, generator plus receptor wires inside a cylindrical conduit, and a single receptor wire inside a cylindrical conduit. Part 1 addresses the first two cases, and Part 2 addresses the final two. Agreement between the analysis methods and test data is shown to be very good.

  6. 30 CFR 75.1003 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 75.1003 Section 75.1003... Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. Trolley wires, trolley feeder wires, and bare signal wires shall be...

  7. 30 CFR 75.1003 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 75.1003 Section 75.1003... Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. Trolley wires, trolley feeder wires, and bare signal wires shall be...

  8. Windows: Life after Wire.

    ERIC Educational Resources Information Center

    Razwick, Jerry

    2003-01-01

    Although wired glass is extremely common in school buildings, the International Building Code adopted new standards that eliminate the use of traditional wired glass in K-12 schools, daycare centers, and athletic facilities. Wired glass breaks easily, and the wires can cause significant injuries by forming dangerous snags when the glass breaks.…

  9. Automatic wire twister.

    PubMed

    Smith, J F; Rodeheaver, G T; Thacker, J G; Morgan, R F; Chang, D E; Fariss, B L; Edlich, R F

    1988-06-01

    This automatic wire twister used in surgery consists of a 6-inch needle holder attached to a twisting mechanism. The major advantage of this device is that it twists wires significantly more rapidly than the conventional manual techniques. Testing has found that the ultimate force required to disrupt the wires twisted by either the automatic wire twister or manual techniques did not differ significantly and was directly related to the number of twists. The automatic wire twister reduces the time needed for wire twisting without altering the security of the twisted wire.

  10. Validation of the Algorithm for Base Maintenance Overhead Costs for the Component Support Cost System (D160B).

    DTIC Science & Technology

    2014-09-26

    FOR I BASE MAINTENANCE OVERHEAD COSTS FOR THE COMPONENT SUPPORT COST SYSTEM (D160B) Contract No. F33600-82-C-0543 DTIC 13 December 1983 S ELECTED JUL 1...PREFIXES SRD Prefix Definition A-- Aircraft and Drones G-- Support Equipment H-- Precision Measurement Equipment N-- Air launched missiles and Guided...Missiles; Ground- O Launched Missiles; Except ICBMS; Drones ; and Related Training Equipment, 1 August 1976, updated to 15 October 1982 [221 TO-00-20-2-l0

  11. Stretched Wire Mechanics

    SciTech Connect

    Bowden, Gordon; /SLAC

    2005-09-06

    Stretched wires are beginning to play an important role in the alignment of accelerators and synchrotron light sources. Stretched wires are proposed for the alignment of the 130 meter long LCLS undulator. Wire position technology has reached sub-micron resolution yet analyses of perturbations to wire straightness are hard to find. This paper considers possible deviations of stretched wire from the simple 2-dimensional catenary form.

  12. A Reference Model for Virtual Machine Launching Overhead

    SciTech Connect

    Wu, Hao; Ren, Shangping; Garzoglio, Gabriele; Timm, Steven; Bernabeu, Gerard; Chadwick, Keith; Noh, Seo-Young

    2014-01-01

    Cloud bursting is one of the key research topics in the cloud computing communities. A well designed cloud bursting module enables private clouds to automatically launch virtual machines (VMs) to public clouds when more resources are needed. One of the main challenges in developing a cloud bursting module is to decide when and where to launch a VM so that all resources are most effectively and efficiently utilized and the system performance is optimized. However, based on system operational data obtained from FermiCloud, a private cloud developed by the Fermi National Accelerator Laboratory for scientific workflows, the VM launching overhead is not a constant. It varies with physical resource utilization, such as CPU and I/O device utilizations, at the time when a VM is launched. Hence, to make judicious decisions as to when and where a VM should be launched, a VM launching overhead reference model is needed. In this paper, we first develop a VM launching overhead reference model based on operational data we have obtained on FermiCloud. Second, we apply the developed reference model on FermiCloud and compare calculated VM launching overhead values based on the model with measured overhead values on FermiCloud. Our empirical results on FermiCloud indicate that the developed reference model is accurate. We believe, with the guidance of the developed reference model, efficient resource allocation algorithms can be developed for cloud bursting process to minimize the operational cost and resource waste.

  13. Ergonomic Assessment of Floor-based and Overhead Lifts

    PubMed Central

    Waters, Thomas R.; Dick, Robert; Lowe, Brian; Werren, Dwight; Parsons, Kelley

    2015-01-01

    Manual full-body vertical lifts of patients have high risk for developing musculoskeletal disorders. Two primary types of battery-powered lift assist devices are available for these tasks: floor-based and overhead-mounted devices. Studies suggest that the operation of floor-based devices may require excessive pushing and pulling forces and that overhead-mounted devices are safer and require lower operating forces. This study evaluated required operating hand forces and resulting biomechanical spinal loading for overhead-mounted lifts versus floor-based lifts across various floor surfaces and patient weight conditions. We did not examine differences in how operators performed the tasks, but rather focused on differences in required operating forces and estimated biomechanical loads across various exposure conditions for a typical operator. Findings show that the floor-based lifts exceeded recommended exposure limits for pushing and pulling for many of the floor/weight conditions and that the overhead-mounted lifts did not. As expected, forces and spinal loads were greater for nonlinoleum floor surfaces compared with linoleum floors. Based on these findings, it is suggested that overhead-mounted devices be used whenever possible, particularly in instances where carpeted floors would be encountered. PMID:26550545

  14. CURRENT CONCEPTS IN SHOULDER EXAMINATION OF THE OVERHEAD ATHLETE

    PubMed Central

    Ellenbecker, Todd

    2013-01-01

    Examination of the shoulder complex has long been described as challenging. This is particularly true in the examination of the overhead athlete who has structural differences when compared to a shoulder patient who is a non‐athlete. Complexity with the examination is due to unique biomechanical and structural changes, multiple joint articulations, multiple pain patterns, and the potential of injury to structures both inside (intra‐articular) and outside (extra‐articular) the glenohumeral joint. Repetitive stresses placed on the shoulders of overhead athletes may affect range of motion, strength, scapular position, and ultimately, the integrity of soft tissue and bony structures in any of the joints that comprise the shoulder complex. Furthermore, many shoulder examination tests thought to be unique to a single structure, joint, or condition can be positive in multiple conditions. The examination of the overhead athletes shoulder, coupled with a thorough medical history will provide a solid foundation to allow a functional physical therapy diagnosis and provide clues as to the presence of the lesion (s) causing disability. The purpose of this clinical commentary is to assist the reader to understand the unique physical characteristics of the overhead athlete, which will lead to a more accurate and reproducible evaluation of athletes who sustain injuries while participating in overhead sports. Level of Evidence: 5 PMID:24175138

  15. Modeling Spatial Dependencies in High-Resolution Overhead Imagery

    SciTech Connect

    Cheriyadat, Anil M; Bright, Eddie A; Vatsavai, Raju

    2011-01-01

    Human settlement regions with different physical and socio-economic attributes exhibit unique spatial characteristics that are often illustrated in high-resolution overhead imageries. For example- size, shape and spatial arrangements of man-made structures are key attributes that vary with respect to the socioeconomic profile of the neighborhood. Successfully modeling these attributes is crucial in developing advanced image understanding systems for interpreting complex aerial scenes. In this paper we present three different approaches to model the spatial context in the overhead imagery. First, we show that the frequency domain of the image can be used to model the spatial context [1]. The shape of the spectral energy contours characterize the scene context and can be exploited as global features. Secondly, we explore a discriminative framework based on the Conditional Random Fields (CRF) [2] to model the spatial context in the overhead imagery. The features derived from the edge orientation distribution calculated for a neighborhood and the associated class labels are used as input features to model the spatial context. Our third approach is based on grouping spatially connected pixels based on the low-level edge primitives to form support-regions [3]. The statistical parameters generated from the support-region feature distributions characterize different geospatial neighborhoods. We apply our approaches on high-resolution overhead imageries. We show that proposed approaches characterize the spatial context in overhead imageries.

  16. Concealed wire tracing apparatus

    DOEpatents

    Kronberg, James W.

    1994-01-01

    An apparatus and method that combines a signal generator and a passive signal receiver to detect and record the path of partially or completely concealed electrical wiring without disturbing the concealing surface. The signal generator applies a series of electrical pulses to the selected wiring of interest. The applied pulses create a magnetic field about the wiring that can be detected by a coil contained within the signal receiver. An audible output connected to the receiver and driven by the coil reflects the receivers position with respect to the wiring. The receivers audible signal is strongest when the receiver is directly above the wiring and the long axis of the receivers coil is parallel to the wiring. A marking means is mounted on the receiver to mark the location of the wiring as the receiver is directed over the wiring's concealing surface. Numerous marks made on various locations of the concealing surface will trace the path of the wiring of interest.

  17. Wire Test Grip Fixture

    NASA Technical Reports Server (NTRS)

    Burke, Christopher S.

    2011-01-01

    Wire-testing issues, such as the gripping strains imposed on the wire, play a critical role in obtaining clean data. In a standard test frame fitted with flat wedge grips, the gripping action alone creates stresses on the wire specimen that cause the wire to fail at the grip location. A new test frame, which is outfitted with a vacuum chamber, negated the use of any conventional commercially available wire test fixtures, as only 7 in. (17.8 cm) existed between the grip faces. An innovative grip fixture was designed to test thin gauge wire for a variety of applications in an existing Instron test frame outfitted with a vacuum chamber.

  18. Cable Bundle Wire Derating

    NASA Technical Reports Server (NTRS)

    Lundquist, Ray A.; Leidecker, Henning

    1999-01-01

    The allowable operating currents of electrical wiring when used in the space vacuum environment is predominantly determined by the maximum operating temperature of the wire insulation. For Kapton insulated wire this value is 200 degree C. Guidelines provided in the Goddard Space Flight Center (GSFC) Preferred Parts List (PPL) limit the operating current of wire within vacuum to ensure the maximum insulation temperature is not exceeded. For 20 AWG wire, these operating parameters are: (1) 3.7 amps per wire (2) bundle of 15 or more wires (3) 70 C environment (4) vacuum of 10(exp -5) torr or less To determine the behavior and temperature of electrical wire at different operating conditions, a thermal vacuum test was performed on a representative electrical harness of the Hubble Space Telescope (HST) power distribution system. This paper describes the test and the results.

  19. Cable Bundle Wire Derating

    NASA Technical Reports Server (NTRS)

    Lundquist, Ray A.; Leidecker, Henning

    1998-01-01

    The allowable operating currents of electrical wiring when used in the space vacuum environment is predominantly determined by the maximum operating temperature of the wire insulation. For Kapton insulated wire this value is 200 C. Guidelines provided in the Goddard Space Flight Center (GSFC) Preferred Parts List (PPL) limit the operating current of wire within vacuum to ensure the maximum insulation temperature is not exceeded. For 20 AWG wire, these operating parameters are: (1) 3.7 amps per wire; (2) bundle of 15 or more wires; (3) 70 C environment: and (4) vacuum of 10(exp -5) torr or less. To determine the behavior and temperature of electrical wire at different operating conditions, a thermal vacuum test was performed on a representative electrical harness of the Hubble Space Telescope (HST) power distribution system. This paper describes the test and the results.

  20. Cable Bundle Wire Derating

    NASA Technical Reports Server (NTRS)

    Lundquist, Ray A.; Leidecker, Henning

    1998-01-01

    The allowable operating currents of electrical wiring when used in the space vacuum environment is predominantly determined by the maximum operating temperature of the wire insulation. For Kapton insulated wire this value is 200 C. Guidelines provided in the Goddard Space Flight Center (GSFC) Preferred Parts List (PPL) limit the operating current of wire within vacuum to ensure the maximum insulation temperature is not exceeded. For 20 AWG wire, these operating parameters are: 3.7 amps per wire, bundle of 15 or more wires, 70 C environment, and vacuum of 10(exp -5) torr or less. To determine the behavior and temperature of electrical wire at different operating conditions, a thermal vacuum test was performed on a representative electrical harness of the Hubble Space Telescope (HST) power distribution system. This paper describes the test and the results.

  1. Wire harness twisting aid

    NASA Technical Reports Server (NTRS)

    Casey, E. J.; Commadore, C. C.; Ingles, M. E.

    1980-01-01

    Long wire bundles twist into uniform spiral harnesses with help of simple apparatus. Wires pass through spacers and through hand-held tool with hole for each wire. Ends are attached to low speed bench motor. As motor turns, operator moves hand tool away forming smooth twists in wires between motor and tool. Technique produces harnesses that generate less radio-frequency interference than do irregularly twisted cables.

  2. EMF wire code research

    SciTech Connect

    Jones, T.

    1993-11-01

    This paper examines the results of previous wire code research to determines the relationship with childhood cancer, wire codes and electromagnetic fields. The paper suggests that, in the original Savitz study, biases toward producing a false positive association between high wire codes and childhood cancer were created by the selection procedure.

  3. 13. Emplacement no. 2, overhead view of counterweight well, showing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Emplacement no. 2, overhead view of counterweight well, showing channel for gun motor cable and bolt plates upon which base ring of gun carriage was mounted - Fort Wadsworth Battery Romeyn B. Ayers, South side of Ayers Road, Staten Island, Rosebank, Richmond County, NY

  4. View east from western edge of complex. Collapsed overhead conveyor ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View east from western edge of complex. Collapsed overhead conveyor in foreground carried ganister down to the brickyard from crushing and grinding facility on the mountain. - Harbison-Walker Refractories Company, West end of Shirley Street, Mount Union, Huntingdon County, PA

  5. Phase Sensitive Cueing for 3D Objects in Overhead Images

    SciTech Connect

    Paglieroni, D

    2005-02-04

    Locating specific 3D objects in overhead images is an important problem in many remote sensing applications. 3D objects may contain either one connected component or multiple disconnected components. Solutions must accommodate images acquired with diverse sensors at various times of the day, in various seasons of the year, or under various weather conditions. Moreover, the physical manifestation of a 3D object with fixed physical dimensions in an overhead image is highly dependent on object physical dimensions, object position/orientation, image spatial resolution, and imaging geometry (e.g., obliqueness). This paper describes a two-stage computer-assisted approach for locating 3D objects in overhead images. In the matching stage, the computer matches models of 3D objects to overhead images. The strongest degree of match over all object orientations is computed at each pixel. Unambiguous local maxima in the degree of match as a function of pixel location are then found. In the cueing stage, the computer sorts image thumbnails in descending order of figure-of-merit and presents them to human analysts for visual inspection and interpretation. The figure-of-merit associated with an image thumbnail is computed from the degrees of match to a 3D object model associated with unambiguous local maxima that lie within the thumbnail. This form of computer assistance is invaluable when most of the relevant thumbnails are highly ranked, and the amount of inspection time needed is much less for the highly ranked thumbnails than for images as a whole.

  6. 19. Interior view showing flight simulator partition and rear overhead ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Interior view showing flight simulator partition and rear overhead door, dock no. 493. View to south. - Offutt Air Force Base, Looking Glass Airborne Command Post, Nose Docks, On either side of Hangar Access Apron at Northwest end of Project Looking Glass Historic District, Bellevue, Sarpy County, NE

  7. MOBILE LADLES, ATTACHED TO OVERHEAD RAILS, ARE FILLED AT EITHER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    MOBILE LADLES, ATTACHED TO OVERHEAD RAILS, ARE FILLED AT EITHER THE MALLEABLE FOUNDRY BULL LADLE OR ELECTRIC FURNACE BEFORE THEY TRANSPORT MOLTEN IRON TO MOLDS PREPARED BY DISAMATIC MOLDMAKING MACHINE OR ON ONE OF THE CONVEYORS. - Stockham Pipe & Fittings Company, Malleable Foundry, 4000 Tenth Avenue North, Birmingham, Jefferson County, AL

  8. GRINDING ROOM, LOOKING EAST. NOTE OVERHEAD BRIDGE CRANE RIDING ON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    GRINDING ROOM, LOOKING EAST. NOTE OVERHEAD BRIDGE CRANE RIDING ON STEEL RAILS SUPPORTED BY WOODEN BEAMS AND CYCLONE CLASSIFIER IN CENTER. AT RIGHT IS TOP PORTION OF FLASH FLOTATION CELL. - Shenandoah-Dives Mill, 135 County Road 2, Silverton, San Juan County, CO

  9. Dissolving Carboxylic Acids and Primary Amines on the Overhead Projector

    ERIC Educational Resources Information Center

    Solomon, Sally D.; Rutkowsky, Susan A.

    2010-01-01

    Liquid carboxylic acids (or primary amines) with limited solubility in water are dissolved by addition of aqueous sodium hydroxide (or hydrochloric acid) on the stage of an overhead projector using simple glassware and very small quantities of chemicals. This effective and colorful demonstration can be used to accompany discussions of the…

  10. The Overhead Projector and the Teacher of English in Brazil.

    ERIC Educational Resources Information Center

    Funck, Elvio Antonio

    This paper presents arguments for the consistent use of modern audiovisual aids in English classes, not as a complementary device, but as a fundamental aid. The intention of the thesis is to: (1) show that the overhead projector can be used to help students develop the four language skills; and (2) encourage English teachers, particularly in…

  11. Oblique view to the northwest detailing four overhead rolling doors ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Oblique view to the northwest detailing four overhead rolling doors on the northeast elevation - Over-the-Horizon Backscatter Radar Network, Mountain Home Air Force Operations Building, On Desert Street at 9th Avenue Mountain Home Air Force Base, Mountain Home, Elmore County, ID

  12. 78 FR 77027 - Overhead Clearance (Air-Draft) Accidents

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-20

    ... address the problem of overhead clearance (air-draft) accidents. In its petition, which calls for vessel... methods: (1) Federal eRulemaking Portal: http://www.regulations.gov . (2) Fax: 202-493-2251. (3) Mail..., ] contact LCDR William Nabach, Office of Vessel and Facility Operating Standards (CG-OES-2), U.S....

  13. A Simple Polarimeter and Experiments Utilizing an Overhead Projector.

    ERIC Educational Resources Information Center

    Dorn, H. C.; And Others

    1984-01-01

    Although polarimeters that illustrate rotation of plane-polarized light by chiral solutions have been previously described, the polarimeter described in this paper has certain advantages when used in conjunction with an overhead projector. Instructions for constructing this polarimeter and its use in demonstrating the optical activity of sugars…

  14. The Overhead System: Production, Implementation and Utilization. 2nd Edition.

    ERIC Educational Resources Information Center

    Smith, Richard E.; Pearson, Jerry D.

    This handbook is designed to help three groups: the administrator who does not have the services of a media specialist, the media specialist who wishes to expand his knowledge or skills, and the classroom teacher who recognizes the value of the overhead as a teaching tool and is looking for practical assistance. Guidelines are provided in 11…

  15. 18. PRIOR TO THE USE OF CONVEYORS AND OVERHEAD RAILS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. PRIOR TO THE USE OF CONVEYORS AND OVERHEAD RAILS, MOLDERS, USUALLY AFRICAN-AMERICAN, HAD TO INDIVIDUALLY HAND FILL MOLDS LAID OUT ON THE FLOOR, SUCH AS THESE IN THE MALLEABLE FOUNDRY IN 1923. - Stockham Pipe & Fittings Company, 4000 Tenth Avenue North, Birmingham, Jefferson County, AL

  16. 5. OVERHEAD VIEW OF GENE CAMP LOOKING SOUTH. GENE PUMP ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. OVERHEAD VIEW OF GENE CAMP LOOKING SOUTH. GENE PUMP PLANT IS AT CENTER WITH ADMINISTRATIVE COMPLEX IN FOREGROUND AND RESIDENTIAL AREA BEYOND PLANT. - Gene Pump Plant, South of Gene Wash Reservoir, 2 miles west of Whitsett Pump Plant, Parker Dam, San Bernardino County, CA

  17. Overhead Projector Demonstrations: Some Ideas from the Past.

    ERIC Educational Resources Information Center

    Kolb, Doris

    1987-01-01

    Describes nine chemistry demonstrations that can be done using an overhead projector. Includes demonstrations on common ion effect, crystal formation from supersaturated solutions, making iron positive with nitric acid, optical activity, carbon dioxide in human breath, amphoteric hydroxides, the surface tension of mercury, and natural acid-base…

  18. STOCK YARD LOOKING SOUTHEAST SHOWING OVERHEAD YARD CRANE RAIL, THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    STOCK YARD LOOKING SOUTHEAST SHOWING OVERHEAD YARD CRANE RAIL, THE MALLEABLE CUPOLAS AND EMISSION RECOVERY SYSTEM, OLD SHED ROOF THAT COVERED THE EARLIER MALLEABLE CUPOLA CHARGING CRANE, MALLEABLE FOUNDRY, AND POLLUTION CONTROL BAGHOUSE. - Stockham Pipe & Fittings Company, 4000 Tenth Avenue North, Birmingham, Jefferson County, AL

  19. Overhead Projector Spectrum of Polymethine Dye: A Physical Chemistry Demonstration.

    ERIC Educational Resources Information Center

    Solomon, Sally; Hur, Chinhyu

    1995-01-01

    Encourages the incorporation into lecture of live experiments that can be predicted or interpreted with abstract models. A demonstration is described where the position of the predominant peak of 1,1'-diethyl-4,4'-cyanine iodide is measured in class using an overhead projector spectrometer, then predicted using the model of a particle in a…

  20. 12. OVERHEAD VIEW OF THE EVISCERATION AREA; LOOKING NORTH FROM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. OVERHEAD VIEW OF THE EVISCERATION AREA; LOOKING NORTH FROM THE VISITORS' GALLERY; NOTE THE RAISED CONCRETE PLATFORMS FOR WORKERS; VISCERA TABLE HAS BEEN REMOVED - Rath Packing Company, Beef Killing Building, Sycamore Street between Elm & Eighteenth Streets, Waterloo, Black Hawk County, IA

  1. 13. Interior view, grain tanks (bins). Barrel view of overhead ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Interior view, grain tanks (bins). Barrel view of overhead (fill) conveyor gallery bridge extending through tops of tanks just below roofs. Grain tripper straddles belt conveyor at mid-view. - Saint Anthony Elevator No. 3, 620 Malcom Avenue, Southeast, Minneapolis, Hennepin County, MN

  2. 5. Overhead trackandpulley system used to haul materials stored in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Overhead track-and-pulley system used to haul materials stored in stock bins under Jones Street to the Tender Frame Shop. - Central of Georgia Railway, Savannah Repair Shops & Terminal Facilities, Tender Frame Shop, Bounded by West Broad, Jones, West Boundary & Hull Streets, Savannah, Chatham County, GA

  3. Communication overhead on the Intel iPSC-860 hypercube

    NASA Technical Reports Server (NTRS)

    Bokhari, Shahid H.

    1990-01-01

    Experiments were conducted on the Intel iPSC-860 hypercube in order to evaluate the overhead of interprocessor communication. It is demonstrated that: (1) contrary to popular belief, the distance between two communicating processors has a significant impact on communication time, (2) edge contention can increase communication time by a factor of more than 7, and (3) node contention has no measurable impact.

  4. Prevalence of Scapular Dyskinesis in Overhead and Nonoverhead Athletes

    PubMed Central

    Burn, Matthew B.; McCulloch, Patrick C.; Lintner, David M.; Liberman, Shari R.; Harris, Joshua D.

    2016-01-01

    Background: Scapular dyskinesis, or abnormal dynamic scapular control, is a condition that is commonly associated with shoulder pathology but is also present in asymptomatic individuals. Literature varies on whether it represents a cause or symptom of shoulder pathology, but it is believed to be a risk factor for further injury. Clinical identification focuses on visual observation and examination maneuvers. Treatment of altered scapular motion has been shown to improve shoulder symptoms. It is thought to be more common in overhead athletes due to their reliance on unilateral upper extremity function but the incidence within nonoverhead athletes is unknown. Hypothesis: Overhead athletes will have a greater prevalence of scapular dyskinesis when compared with nonoverhead athletes. Study Design: Systematic review; Level of evidence, 3. Methods: After PROSPERO registration, a systematic review was performed using PRISMA guidelines through the PubMed database looking for studies published before October 2014. All studies containing the search terms scapular, scapulothoracic, dyskinesis, dyskinesia, shoulder athlete, or overhead athlete were included. Studies that did not include prevalence data for scapular dyskinesis were excluded. Study methodological quality was evaluated using the modified Coleman methodology score. Descriptive statistics and 2-proportion 2-tailed z-tests were used to compare the reported prevalence of scapular dyskinesis between overhead and nonoverhead athletes. Results: Twelve studies were analyzed including 1401 athletes (1257 overhead and 144 nonoverhead; mean age, 24.4 ± 7.1 years; 78% men). All the studies were evidence level 2 (33%) or level 3 (67%). The reported prevalence of scapular dyskinesis was significantly (P < .0001) higher in overhead athletes (61%) compared with nonoverhead athletes (33%). Conclusion: Scapular dyskinesis was found to have a greater reported prevalence (61%) in overhead athletes compared with nonoverhead athletes

  5. 29 CFR 1926.404 - Wiring design and protection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Requirements § 1926.404 Wiring design and protection. (a) Use and identification of grounded and grounding conductors—(1) Identification of conductors. A conductor used as a grounded conductor shall be identifiable... shall be identifiable and distinguishable from all other conductors. (2) Polarity of connections....

  6. 29 CFR 1926.404 - Wiring design and protection.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of grounding terminals and devices. A grounding terminal or grounding-type device on a receptacle... construction sites, which are not a part of the permanent wiring of the building or structure and which are in... the circuit conductors of the generator are insulated from the generator frame and all other...

  7. 29 CFR 1926.404 - Wiring design and protection.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of grounding terminals and devices. A grounding terminal or grounding-type device on a receptacle... construction sites, which are not a part of the permanent wiring of the building or structure and which are in... the circuit conductors of the generator are insulated from the generator frame and all other...

  8. 29 CFR 1926.404 - Wiring design and protection.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of grounding terminals and devices. A grounding terminal or grounding-type device on a receptacle... construction sites, which are not a part of the permanent wiring of the building or structure and which are in... the circuit conductors of the generator are insulated from the generator frame and all other...

  9. 29 CFR 1926.404 - Wiring design and protection.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of grounding terminals and devices. A grounding terminal or grounding-type device on a receptacle... construction sites, which are not a part of the permanent wiring of the building or structure and which are in... the circuit conductors of the generator are insulated from the generator frame and all other...

  10. Flicking-wire drag tensioner

    NASA Technical Reports Server (NTRS)

    Dassele, M. A.; Fairall, H.

    1978-01-01

    Wire-drag system improves wire profile and applies consistent drag to wire. Wire drag is continuously adjustable from zero drag to tensile strength of wire. No-sag wire drag is easier to thread than former system and requires minimal downtime for cleaning and maintenance.

  11. Moeglichkeiten individualisierter Arbeit mit Hilfe des Overhead-Projektors (Possibilities for Individualized Work with the Aid of the Overhead Projector)

    ERIC Educational Resources Information Center

    Budde, Ulrich

    1975-01-01

    Individualized work in teaching English is highly desirable, and the overhead projector is particularly useful in such work. Three examples of its possibilities are given: Dialog treatment, working with basic ("kernel") texts, and comparison of the simple present, simple past and present perfect tenses. (Text is in German.) (IFS/WGA)

  12. 49 CFR 236.108 - Insulation resistance tests, wires in trunking and cables.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Insulation resistance tests, wires in trunking and... Insulation resistance tests, wires in trunking and cables. (a) Insulation resistance of wires and cables... dry. Insulation resistance tests shall be made between all conductors and ground, and...

  13. 49 CFR 236.108 - Insulation resistance tests, wires in trunking and cables.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Insulation resistance tests, wires in trunking and... Insulation resistance tests, wires in trunking and cables. (a) Insulation resistance of wires and cables... dry. Insulation resistance tests shall be made between all conductors and ground, and...

  14. Base Information Transport Infrastructure Wired (BITI Wired)

    DTIC Science & Technology

    2016-03-01

    Information Retrieval (DAMIR) UNCLASSIFIED BITI Wired 2016 MAR UNCLASSIFIED 2 Table of Contents Common Acronyms and Abbreviations for MAIS...Major Automated Information System MAIS OE - MAIS Original Estimate MAR – MAIS Annual Report MDA - Milestone Decision Authority MDD - Materiel...Then Year U.S.C- United States Code USD(AT&L) - Under Secretary of Defense for Acquisition, Technology, & Logistics BITI Wired 2016 MAR

  15. 30 CFR 57.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Work or travel on overhead crane bridges. 57... MINES Materials Storage and Handling § 57.16015 Work or travel on overhead crane bridges. No person shall work from or travel on the bridge of an overhead crane unless the bridge is provided...

  16. 30 CFR 57.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Work or travel on overhead crane bridges. 57... MINES Materials Storage and Handling § 57.16015 Work or travel on overhead crane bridges. No person shall work from or travel on the bridge of an overhead crane unless the bridge is provided...

  17. 30 CFR 57.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Work or travel on overhead crane bridges. 57... MINES Materials Storage and Handling § 57.16015 Work or travel on overhead crane bridges. No person shall work from or travel on the bridge of an overhead crane unless the bridge is provided...

  18. 30 CFR 56.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Work or travel on overhead crane bridges. 56... Materials Storage and Handling § 56.16015 Work or travel on overhead crane bridges. No person shall work from or travel on the bridge of an overhead crane unless the bridge is provided with...

  19. 30 CFR 57.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Work or travel on overhead crane bridges. 57... MINES Materials Storage and Handling § 57.16015 Work or travel on overhead crane bridges. No person shall work from or travel on the bridge of an overhead crane unless the bridge is provided...

  20. 30 CFR 56.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Work or travel on overhead crane bridges. 56... Materials Storage and Handling § 56.16015 Work or travel on overhead crane bridges. No person shall work from or travel on the bridge of an overhead crane unless the bridge is provided with...

  1. 30 CFR 56.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Work or travel on overhead crane bridges. 56... Materials Storage and Handling § 56.16015 Work or travel on overhead crane bridges. No person shall work from or travel on the bridge of an overhead crane unless the bridge is provided with...

  2. 30 CFR 56.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Work or travel on overhead crane bridges. 56... Materials Storage and Handling § 56.16015 Work or travel on overhead crane bridges. No person shall work from or travel on the bridge of an overhead crane unless the bridge is provided with...

  3. 75 FR 81661 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Overhead...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-28

    ...; Overhead and Gantry Cranes Standard ACTION: Notice. SUMMARY: The Department of Labor (DOL) hereby announces... collection request (ICR) titled, ``Overhead and Gantry Cranes Standard,'' to the Office of Management and... Health Administration (OSHA). Title of Collection: Overhead and Gantry Cranes Standard. OMB...

  4. 30 CFR 57.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Work or travel on overhead crane bridges. 57... MINES Materials Storage and Handling § 57.16015 Work or travel on overhead crane bridges. No person shall work from or travel on the bridge of an overhead crane unless the bridge is provided...

  5. 30 CFR 56.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Work or travel on overhead crane bridges. 56... Materials Storage and Handling § 56.16015 Work or travel on overhead crane bridges. No person shall work from or travel on the bridge of an overhead crane unless the bridge is provided with...

  6. Ten Suggestions and One Commandment: Using Overhead Projectors in Geography Classrooms.

    ERIC Educational Resources Information Center

    Gersmehl, Philip J.

    1985-01-01

    Suggestions for effective use of overhead projectors include making images large, preparing standard base maps, making lettering clear, presenting only one idea per overhead, keeping things simple, using only half a page for each image, using the overhead as a chalkboard, using color thoughtfully, making symbols bold, and anticipating emergencies.…

  7. 30 CFR 77.1802 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 77.1802 Section 77.1802... Wires and Trolley Feeder Wires § 77.1802 Insulation of trolley wires, trolley feeder wires and...

  8. 30 CFR 77.1802 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 77.1802 Section 77.1802... Wires and Trolley Feeder Wires § 77.1802 Insulation of trolley wires, trolley feeder wires and...

  9. 30 CFR 77.1802 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 77.1802 Section 77.1802... Wires and Trolley Feeder Wires § 77.1802 Insulation of trolley wires, trolley feeder wires and...

  10. 30 CFR 77.1802 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 77.1802 Section 77.1802... Wires and Trolley Feeder Wires § 77.1802 Insulation of trolley wires, trolley feeder wires and bare..., and bare signal wires shall be adequately guarded: (a) At all points where men are required to work...

  11. 30 CFR 77.1802 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 77.1802 Section 77.1802... Wires and Trolley Feeder Wires § 77.1802 Insulation of trolley wires, trolley feeder wires and bare..., and bare signal wires shall be adequately guarded: (a) At all points where men are required to work...

  12. Reducing the overhead for quantum computation when noise is biased

    NASA Astrophysics Data System (ADS)

    Webster, Paul; Bartlett, Stephen D.; Poulin, David

    2015-12-01

    We analyze a model for fault-tolerant quantum computation with low overhead suitable for situations where the noise is biased. The basis for this scheme is a gadget for the fault-tolerant preparation of magic states that enable universal fault-tolerant quantum computation using only Clifford gates that preserve the noise bias. We analyze the distillation of |T > -type magic states using this gadget at the physical level, followed by concatenation with the 15-qubit quantum Reed-Muller code, and comparing our results with standard constructions. In the regime where the noise bias (rate of Pauli Z errors relative to other single-qubit errors) is greater than a factor of 10, our scheme has lower overhead across a broad range of relevant noise rates.

  13. MICROINSTABILITY OF THE SHOULDER IN THE OVERHEAD ATHLETE

    PubMed Central

    Curtis, Alan S.

    2013-01-01

    The overhead throwing athlete is an extremely challenging patient in sports medicine. The repetitive microtraumatic stresses and extreme ranges of motion observed within the athlete’s shoulder joint complex during the throwing motion constantly place the athlete at risk for injury. While gross instability of the shoulder is possible, microinstability is seen far more frequently and is associated with a variety of different pathologies, including rotator cuff tendonitis, internal impingement, and labral lesions. Treatment of the overhead athlete requires the understanding of several principles based on the unique physical characteristics of this type of athlete and the demands placed upon the static stabilizing structures during the act of throwing. The purpose of this paper is to describe these principles and incorporate them into in a multi‐phase progressive rehabilitation program designed to prevent injuries and rehabilitate the injured athlete, both non‐operatively and postoperatively. PMID:24175140

  14. Electromyographic analysis of an ergonomic risk factor: overhead work

    PubMed Central

    Kinali, Gulsah; Kara, Sadık; Yıldırım, Mustafa Selman

    2016-01-01

    [Purpose] Repetitive upper extremity exercises result in overuse injuries. However, it is challenging to identify the specific causative movements. This study evaluated the effects of different shoulder positions on grip and electrophysiological activity of upper extremity muscles. [Subjects and Methods] Forty subjects ranging from 18 and 30 years of age were analyzed. Surface electromyography and hand grip strength were measured during a range of shoulder exercises and numerous signal processing methods were applied. [Results] The maximum electromyographic activity intensity was observed in the wrist extensors at various angles. Deltoid activity rose significantly during shoulder flexion. [Conclusion] Overhead work causes shoulder muscle fatigue and prevents effective hand function, which affects occupational health and efficiency. Overhead work involves a hazardous position and decreases efficiency. Ergonomic solutions should be developed to prevent muscle fatigue and decreased grip force. PMID:27390448

  15. Electromyographic analysis of an ergonomic risk factor: overhead work.

    PubMed

    Kinali, Gulsah; Kara, Sadık; Yıldırım, Mustafa Selman

    2016-06-01

    [Purpose] Repetitive upper extremity exercises result in overuse injuries. However, it is challenging to identify the specific causative movements. This study evaluated the effects of different shoulder positions on grip and electrophysiological activity of upper extremity muscles. [Subjects and Methods] Forty subjects ranging from 18 and 30 years of age were analyzed. Surface electromyography and hand grip strength were measured during a range of shoulder exercises and numerous signal processing methods were applied. [Results] The maximum electromyographic activity intensity was observed in the wrist extensors at various angles. Deltoid activity rose significantly during shoulder flexion. [Conclusion] Overhead work causes shoulder muscle fatigue and prevents effective hand function, which affects occupational health and efficiency. Overhead work involves a hazardous position and decreases efficiency. Ergonomic solutions should be developed to prevent muscle fatigue and decreased grip force.

  16. On-line corrosion control in refinery overhead systems

    SciTech Connect

    Correa, L.A.

    1995-11-01

    Corrosion is one of the great causes of accidents and economic losses in petroleum and petrochemical industries. Crude unit overheads are one of the most corrosion affected parts and large amounts of work and money has been spent on its control and prevention. Thus, new materials, inhibitors and monitoring techniques are constantly under testing in order to improve corrosion prevention and plant reliability. Expert Systems are a rising technology in industrial process monitoring and problem diagnosing. This sort of computer program is developed trying to simulate the human expert intelligent behavior in the task of solving a specific problem. The crude units overhead corrosion control is a hard and time consuming task that seems to be a fruitful field to expert systems application.

  17. Overhead-Performance Tradeoffs in Distributed Wireless Networks

    DTIC Science & Technology

    2015-06-26

    time-frequency resources are spent on non-information bearing control information that is not efficiently encoded. Three simple resource controllers...poorly encoded non-information bearing resource measurement and control signals. This enabled the investigators to make a strong case for studying the...between the overhead an optimized distributed wireless network controller collects and the performance on the data- bearing signals it achieves: the more

  18. Passive optical sensor for lightning detection on overhead power lines

    NASA Astrophysics Data System (ADS)

    Rosolem, J. B.; Barbosa, C. F.; Florídia, C.; Bezerra, E. L.

    2009-10-01

    In this work we present the results of a passive optical sensor for monitoring lightning strikes on overhead power lines, which can also be used for several other applications. The optic sensor is very simple and cheap and basically consists in the use of an antenna connected directly to a semiconductor laser. No batteries and solar panels are necessary to implement this sensing system in power lines towers. It was tested in laboratory and showed a good performance.

  19. Glutinous Water. Protecting Vertical and Overhead Surfaces from Fire Spread

    DTIC Science & Technology

    1994-02-28

    DISTRIBUTION CODE Approved for public release; distribution unlimited. 13. ABSTRACT (Maximum 200 words ) Most of the water used in firefighting is not only...Naval Research Laboratory AD-A277 280 Washington, DC 20375-5320 NRL/MR/6180--94-7431 DTIC S ELECTE MAR 24 19941 Glutinous Water F Protecting Vertical...TYPE AND DATES COVERED February 28, 1994 4. TITLE AND SUBTITLE 5. FUNDING NUMBERS Glutinous Water Protecting Vertical and Overhead Surfaces From Fire

  20. An estimation of lightning insulation level of overhead distribution lines

    SciTech Connect

    Jacob, P.B.; Grzybowski, S. . Dept. of Electrical Engineering); Ross, E.R. )

    1991-01-01

    This paper develops a practical procedure for determining the total insulation strength of multiple or composite insulations most commonly used in the design of overhead distribution lines. Laboratory test data were obtained on a wide range of combinations and configurations utilizing porcelain, polymer and fiberglass insulators as well as wood poles and wood crossarms. Data were obtained for both dry and wet conditions with positive and negative polarities of the impulses.

  1. Modeling the Virtual Machine Launching Overhead under Fermicloud

    SciTech Connect

    Garzoglio, Gabriele; Wu, Hao; Ren, Shangping; Timm, Steven; Bernabeu, Gerard; Noh, Seo-Young

    2014-11-12

    FermiCloud is a private cloud developed by the Fermi National Accelerator Laboratory for scientific workflows. The Cloud Bursting module of the FermiCloud enables the FermiCloud, when more computational resources are needed, to automatically launch virtual machines to available resources such as public clouds. One of the main challenges in developing the cloud bursting module is to decide when and where to launch a VM so that all resources are most effectively and efficiently utilized and the system performance is optimized. However, based on FermiCloud’s system operational data, the VM launching overhead is not a constant. It varies with physical resource (CPU, memory, I/O device) utilization at the time when a VM is launched. Hence, to make judicious decisions as to when and where a VM should be launched, a VM launch overhead reference model is needed. The paper is to develop a VM launch overhead reference model based on operational data we have obtained on FermiCloud and uses the reference model to guide the cloud bursting process.

  2. Life cycle assessment of overhead and underground primary power distribution.

    PubMed

    Bumby, Sarah; Druzhinina, Ekaterina; Feraldi, Rebe; Werthmann, Danae; Geyer, Roland; Sahl, Jack

    2010-07-15

    Electrical power can be distributed in overhead or underground systems, both of which generate a variety of environmental impacts at all stages of their life cycles. While there is considerable literature discussing the trade-offs between both systems in terms of aesthetics, safety, cost, and reliability, environmental assessments are relatively rare and limited to power cable production and end-of-life management. This paper assesses environmental impacts from overhead and underground medium voltage power distribution systems as they are currently built and managed by Southern California Edison (SCE). It uses process-based life cycle assessment (LCA) according to ISO 14044 (2006) and SCE-specific primary data to the extent possible. Potential environmental impacts have been calculated using a wide range of midpoint indicators, and robustness of the results has been investigated through sensitivity analysis of the most uncertain and potentially significant parameters. The studied underground system has higher environmental impacts in all indicators and for all parameter values, mostly due to its higher material intensity. For both systems and all indicators the majority of impact occurs during cable production. Promising strategies for impact reduction are thus cable failure rate reduction for overhead and cable lifetime extension for underground systems.

  3. Thin wire pointing method

    NASA Technical Reports Server (NTRS)

    Green, G.; Mattauch, R. J. (Inventor)

    1983-01-01

    A method is described for forming sharp tips on thin wires, in particular phosphor bronze wires of diameters such as one-thousandth inch used to contact micron size Schottky barrier diodes, which enables close control of tip shape and which avoids the use of highly toxic solutions. The method includes dipping an end of a phosphor bronze wire into a dilute solution of sulfamic acid and applying a current through the wire to electrochemically etch it. The humidity in the room is controlled to a level of less than 50%, and the voltage applied between the wire and another electrode in the solutions is a half wave rectified voltage. The current through the wire is monitored, and the process is stopped when the current falls to a predetermined low level.

  4. Sintered wire annode

    DOEpatents

    Falce, Louis R.; Ives, R. Lawrence

    2007-12-25

    A plurality of high atomic number wires are sintered together to form a porous rod that is parted into porous disks which will be used as x-ray targets. A thermally conductive material is introduced into the pores of the rod, and when a stream of electrons impinges on the sintered wire target and generates x-rays, the heat generated by the impinging x-rays is removed by the thermally conductive material interspersed in the pores of the wires.

  5. Wire-inhomogeneity detector

    DOEpatents

    Gibson, G.H.; Smits, R.G.; Eberhard, P.H.

    1982-08-31

    A device for uncovering imperfections in electrical conducting wire, particularly superconducting wire, by detecting variations in eddy currents. Eddy currents effect the magnetic field in a gap of an inductor, contained in a modified commercial ferrite core, through which the wire being tested is passed. A small increase or decrease in the amount of conductive material, such as copper, in a fixed cross section of wire will unbalance a bridge used to measure the impedance of the inductor, tripping a detector and sounding an alarm.

  6. Concealed wire tracing apparatus

    DOEpatents

    Kronberg, J.W.

    1994-05-31

    An apparatus and method that combines a signal generator and a passive signal receiver to detect and record the path of partially or completely concealed electrical wiring without disturbing the concealing surface is disclosed. The signal generator applies a series of electrical pulses to the selected wiring of interest. The applied pulses create a magnetic field about the wiring that can be detected by a coil contained within the signal receiver. An audible output connected to the receiver and driven by the coil reflects the receivers position with respect to the wiring. The receivers audible signal is strongest when the receiver is directly above the wiring and the long axis of the receivers coil is parallel to the wiring. A marking means is mounted on the receiver to mark the location of the wiring as the receiver is directed over the wiring's concealing surface. Numerous marks made on various locations of the concealing surface will trace the path of the wiring of interest. 4 figs.

  7. Weld Wire Investigation Summary

    SciTech Connect

    Cunningham, M.A.

    1999-03-22

    After GTA welding reservoir A production/process prove-in assemblies, X-ray examination detected a lack of sidewall fusion. After examining several possible causes, it was determined that the weld wire filler metal was responsible, particularly the wire cleaning process. The final conclusion was that the filler wire must be abrasively cleaned in a particular manner to perform as required. The abrasive process was incorporated into the wire material specification, ensuring consistency for all reservoir GTA welding at AlliedSignal Federal Manufacturing and Technologies (FM and T).

  8. 1998 wire development workshop proceedings

    SciTech Connect

    1998-04-01

    This report consists of vugraphs of the presentations at the conference. The conference was divided into the following sessions: (1) First Generation Wire Development: Status and Issues; (2) First Generation Wire in Pre-Commercial Prototypes; (3) Second Generation Wire Development: Private Sector Progress and Issues; (4) Second Generation Wire Development: Federal Laboratories; and (5) Fundamental Research Issues for HTS Wire Development.

  9. VIEW SOUTHEASTBUILDING 4 NO. 1 WIRE MILL (1871) WIRE DRAWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW SOUTHEAST-BUILDING 4 NO. 1 WIRE MILL (1871) WIRE DRAWING MACHINE - John A. Roebling's Sons Company & American Steel & Wire Company, South Broad, Clark, Elmer, Mott & Hudson Streets, Trenton, Mercer County, NJ

  10. Characterization of vertical electric fields and associated voltages induced on a overhead power line from close artificially initiated lightning

    NASA Astrophysics Data System (ADS)

    Rubinstein, Marcos; Uman, Martin A.; Thomson, Ewen M.; Medelius, Pedro J.

    1991-08-01

    Measurements were characterized of simultaneous vertical electric fields and voltages induced at both ends of a 448 m overhead power line by artificially initiated lightning return strokes. The lightning discharges struck ground about 20 m from one end of the line. The measured line voltages could be grouped into two categories: those in which multiple, similarly shaped, evenly spaced pulses were observed, which are called oscillatory; and those dominated by a principal pulse with subsidiary oscillations of much smaller amplitude, which are called impulsive. Voltage amplitudes range from tens of kilovolts for oscillatory voltages to hundreds of kilovolts for impulsive voltages.

  11. Wire Array Photovoltaics

    NASA Astrophysics Data System (ADS)

    Turner-Evans, Dan

    Over the past five years, the cost of solar panels has dropped drastically and, in concert, the number of installed modules has risen exponentially. However, solar electricity is still more than twice as expensive as electricity from a natural gas plant. Fortunately, wire array solar cells have emerged as a promising technology for further lowering the cost of solar. Si wire array solar cells are formed with a unique, low cost growth method and use 100 times less material than conventional Si cells. The wires can be embedded in a transparent, flexible polymer to create a free-standing array that can be rolled up for easy installation in a variety of form factors. Furthermore, by incorporating multijunctions into the wire morphology, higher efficiencies can be achieved while taking advantage of the unique defect relaxation pathways afforded by the 3D wire geometry. The work in this thesis shepherded Si wires from undoped arrays to flexible, functional large area devices and laid the groundwork for multijunction wire array cells. Fabrication techniques were developed to turn intrinsic Si wires into full p-n junctions and the wires were passivated with a-Si:H and a-SiNx:H. Single wire devices yielded open circuit voltages of 600 mV and efficiencies of 9%. The arrays were then embedded in a polymer and contacted with a transparent, flexible, Ni nanoparticle and Ag nanowire top contact. The contact connected >99% of the wires in parallel and yielded flexible, substrate free solar cells featuring hundreds of thousands of wires. Building on the success of the Si wire arrays, GaP was epitaxially grown on the material to create heterostructures for photoelectrochemistry. These cells were limited by low absorption in the GaP due to its indirect bandgap, and poor current collection due to a diffusion length of only 80 nm. However, GaAsP on SiGe offers a superior combination of materials, and wire architectures based on these semiconductors were investigated for multijunction

  12. Imagination Visualized in Wire.

    ERIC Educational Resources Information Center

    Skophammer, Karen

    2003-01-01

    Describes an art lesson achieved with a Very Special Artist (VSA) in residence for sixth- and seventh-grade students in which they created wire sculptures. Discusses how the VSA taught the students. Includes a list of art materials and characteristics of wire. (CMK)

  13. 2016 MOST WIRED.

    PubMed

    Barr, Paul; Butcher, Lola; Hoppszallern, Suzanna

    2016-07-01

    This year's IT survey shows that hospitals are aggressively fighting cyber crime and looking for ways to use data to help in the transition to value-based care. Find out who made the 2016 lists of Most Wired, Most Advanced, Most Improved and Most Wired-Small and Rural.

  14. Commercial and Industrial Wiring.

    ERIC Educational Resources Information Center

    Kaltwasser, Stan; Flowers, Gary

    This module is the third in a series of three wiring publications, includes additional technical knowledge and applications required for job entry in the commercial and industrial wiring trade. The module contains 15 instructional units that cover the following topics: blueprint reading and load calculations; tools and equipment; service;…

  15. SRTM is removed from Endeavour's payload bay to ease wiring inspections

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Orbiter Processing Facility, workers observe as an overhead crane lowers the Shuttle Radar Topography Mission (SRTM) into a payload canister. The payload on mission STS-99, SRTM was removed from orbiter Endeavour's payload bay to allow technicians access to the orbiter's midbody for planned wiring inspections. The entire fleet of orbiters is being inspected for wiring abrasions after the problem was first discovered in Columbia. Shuttle managers are reviewing several manifest options and could establish new target launch dates for the balance of 1999 next week. Shuttle Endeavour currently remains slated for launch in early October.

  16. SRTM is removed from Endeavour's payload bay to ease wiring inspections

    NASA Technical Reports Server (NTRS)

    1999-01-01

    Workers inside orbiter Endeavour's payload bay observe as an overhead crane maneuvers to lift the Shuttle Radar Topography Mission (SRTM) for its transfer out of the orbiter to a payload canister. The payload on mission STS-99, SRTM is being removed to allow technicians access to the orbiter's midbody for planned wiring inspections. Endeavour is in the Orbiter Processing Facility. The entire fleet of orbiters is being inspected for wiring abrasions after the problem was first discovered in Columbia. Shuttle managers are reviewing several manifest options and could establish new target launch dates for the balance of 1999 next week. Shuttle Endeavour currently remains slated for launch in early October.

  17. Path-sensitive analysis for reducing rollback overheads

    DOEpatents

    O'Brien, John K.P.; Wang, Kai-Ting Amy; Yamashita, Mark; Zhuang, Xiaotong

    2014-07-22

    A mechanism is provided for path-sensitive analysis for reducing rollback overheads. The mechanism receives, in a compiler, program code to be compiled to form compiled code. The mechanism divides the code into basic blocks. The mechanism then determines a restore register set for each of the one or more basic blocks to form one or more restore register sets. The mechanism then stores the one or more register sets such that responsive to a rollback during execution of the compiled code. A rollback routine identifies a restore register set from the one or more restore register sets and restores registers identified in the identified restore register set.

  18. SHOULDER MUSCLE IMBALANCE AND SUBACROMIAL IMPINGEMENT SYNDROME IN OVERHEAD ATHLETES

    PubMed Central

    2011-01-01

    Subacromial impingement is a frequent and painful condition among athletes, particularly those involved in overhead sports such as baseball and swimming. There are generally two types of subacromial impingement: structural and functional. While structural impingement is caused by a physical loss of area in the subacromial space due to bony growth or inflammation, functional impingement is a relative loss of subacromial space secondary to altered scapulohumeral mechanics resulting from glenohumeral instability and muscle imbalance. The purpose of this review is to describe the role of muscle imbalance in subacromial impingement in order to guide sports physical therapy evaluation and interventions. PMID:21655457

  19. Improved Overhead Accounting in the NLC Main Linac

    SciTech Connect

    Tenenbaum, P.

    2004-06-10

    The NLC main linac contains 1,116 RF power units, of which 5% are considered ''spares'' for replacement of failed power units, make-up of the energy gain during an RF breakdown, and energy feedback. A more careful accounting for the effects of beam loading indicates that the NLC can operate with less BNS overhead and a smaller mean phase offset than was originally specified, and that as a consequence the total number of spares is actually about 7.9% of the total.

  20. Simple circuit monitors "third wire" in ac lines

    NASA Technical Reports Server (NTRS)

    Kojima, T. T.; Stuck, D. E.

    1980-01-01

    Device detects interruption of ground connection in three-wire electrical equipment and shuts off ac power to prevent shock hazard. Silicon-controlled rectifiers detect floating ground, and deenergize optoelectric relays thereby breaking power connections. Circuit could be incorporated into hand tools, appliances, and other electrical equipment.

  1. Next Generation Wiring

    NASA Technical Reports Server (NTRS)

    Medelius, Petro; Jolley, Scott; Fitzpatrick, Lilliana; Vinje, Rubiela; Williams, Martha; Clayton, LaNetra; Roberson, Luke; Smith, Trent; Santiago-Maldonado, Edgardo

    2007-01-01

    Wiring is a major operational component on aerospace hardware that accounts for substantial weight and volumetric space. Over time wire insulation can age and fail, often leading to catastrophic events such as system failure or fire. The next generation of wiring must be reliable and sustainable over long periods of time. These features will be achieved by the development of a wire insulation capable of autonomous self-healing that mitigates failure before it reaches a catastrophic level. In order to develop a self-healing insulation material, three steps must occur. First, methods of bonding similar materials must be developed that are capable of being initiated autonomously. This process will lead to the development of a manual repair system for polyimide wire insulation. Second, ways to initiate these bonding methods that lead to materials that are similar to the primary insulation must be developed. Finally, steps one and two must be integrated to produce a material that has no residues from the process that degrades the insulating properties of the final repaired insulation. The self-healing technology, teamed with the ability to identify and locate damage, will greatly improve reliability and safety of electrical wiring of critical systems. This paper will address these topics, discuss the results of preliminary testing, and remaining development issues related to self-healing wire insulation.

  2. Orbiter Kapton wire operational requirements and experience

    NASA Astrophysics Data System (ADS)

    Peterson, R. V.

    1994-09-01

    The agenda of this presentation includes the Orbiter wire selection requirements, the Orbiter wire usage, fabrication and test requirements, typical wiring installations, Kapton wire experience, NASA Kapton wire testing, summary, and backup data.

  3. Orbiter Kapton wire operational requirements and experience

    NASA Technical Reports Server (NTRS)

    Peterson, R. V.

    1994-01-01

    The agenda of this presentation includes the Orbiter wire selection requirements, the Orbiter wire usage, fabrication and test requirements, typical wiring installations, Kapton wire experience, NASA Kapton wire testing, summary, and backup data.

  4. Contamination source review for Building E3613, Edgewood Area, Aberdeen Proving Ground, Maryland

    SciTech Connect

    Billmark, K.A.; Emken, M.E.; Muir-Ploense, K.L.

    1995-09-01

    This report was prepared by Argonne National Laboratory (ANL) to document the results of a contamination source review of Building E3613 at the Aberdeen Proving Ground (APG) in Maryland. The report may be used to assist the U.S. Army in planning for the future use or disposition of this building, The review included a historical records search, physical inspection, photographic documentation, geophysical investigation, and collection of air samples. The field investigations were performed by ANL during 1994 and 1995. Building E3613 (APG designation) is located in the Canal Creek Area of APG. The building was constructed in 1954 for use as a change house, office, and storage building in support of the white phosphorus smoke program. The building has not been used since 1988. During an inspection in 1988, asbestos was listed as the only potential contaminant. The physical inspection and photographic documentation of Building E3613 were completed in November 1994. At the time of the inspection, Building E3613 was inactive and in disrepair. The single-story, rectangular structure contains five rooms and measures 16 ft 2 in. by 32 ft. The building is wood frame construction with a gabled roof. The exterior walls and roof are constructed of wood covered with asphalt sheeting. The building rests on a concrete foundation. The interior walls are 6-in.-thick wood, and the ceiling is assumed to be white drywall nailed to a wooden frame. Overhead steam pipes supported by vertical pipes traverse the area. Two concrete footings for guy wires that support the overhead steam pipes are located north and west of the building. Four additional vertical pipes exit the ground east of the building.

  5. Active Ground Optical Remote Sensing for Improved Monitoring of Seedling Stress in Nurseries

    Technology Transfer Automated Retrieval System (TEKTRAN)

    Active ground optical remote sensing (AGORS) devices mounted on overhead irrigation booms could help to improve seedling quality by autonomously monitoring seedling stress. In contrast to traditionally used passive optical sensors, AGORS devices operate independently of ambient light conditions and ...

  6. TAUOVERSUPERMON: LOW-OVERHEAD ONLINE PARALLEL PERFORMANCE MONITORING

    SciTech Connect

    SOTTILE, MATTHEW JOSEPH; NATARAJ, AROON; MALONY, ALLEN; MORRIS, ALAN; SHENDE, SAMEER

    2007-01-30

    Online or Real-time application performance monitoring allows tracking performance characteristics during execution as opposed to doing so post-mortem. This opens up several possibilities otherwise unavailable such as real-time visualization and application performance steering that can be useful in the context of long-running applications. Two fundamental components that constitute such a performance monitor are the measurement and transport systems. The former captures performance metrics of individual contexts (processes, threads). The latter enables querying the parallel/distributed state from the different contexts and also allows measurement control. As HPC systems grow in size and complexity, the key challenge is to keep the online performance monitor scalable and low overhead while still providing a useful performance reporting capability. We adapt and combine two existing, mature systems - Tuning and Analysis Utility (TAU) and Supermon - to address this problem. Tau performs the measurement while Supermon is used to collect the distributed measurement state. Our experiments show that this novel approach of using a cluster-monitor, Supermon, as the transport for online performance data from Tau leads to very low-overhead application monitoring as well as other beneits unavailable from using a traditional transport such as NFS.

  7. Vertical Jump Biomechanics Altered With Virtual Overhead Goal.

    PubMed

    Ford, Kevin R; Nguyen, Anh-Dung; Hegedus, Eric J; Taylor, Jeffrey B

    2017-04-01

    Virtual environments with real-time feedback can simulate extrinsic goals that mimic real life conditions. The purpose was to compare jump performance and biomechanics with a physical overhead goal (POG) and with a virtual overhead goal (VOG). Fourteen female subjects participated (age: 18.8 ± 1.1 years, height: 163.2 ± 8.1 cm, weight 63.0 ± 7.9 kg). Sagittal plane trunk, hip, and knee biomechanics were calculated during the landing and take-off phases of drop vertical jump with different goal conditions. Repeated-measures ANOVAs determined differences between goal conditions. Vertical jump height displacement was not different during VOG compared with POG. Greater hip extensor moment (P < .001*) and hip angular impulse (P < .004*) were found during VOG compared with POG. Subjects landed more erect with less magnitude of trunk flexion (P = .002*) during POG compared with VOG. A virtual target can optimize jump height and promote increased hip moments and trunk flexion. This may be a useful alternative to physical targets to improve performance during certain biomechanical testing, screening, and training conditions.

  8. Steal Tree: Low-Overhead Tracing of Work Stealing Schedulers

    SciTech Connect

    Lifflander, Jonathan; Krishnamoorthy, Sriram; Kale, Laxmikant

    2013-06-16

    Work stealing is a popular approach to scheduling task-parallel programs. The flexibility inherent in work stealing when dealing with load imbalance results in seemingly irregular computation structures, complicating the study of its runtime behavior. In this paper, we present an approach to efficiently trace async-finish parallel programs scheduled using work stealing. We identify key properties that allow us to trace the execution of tasks with low time and space overheads. We also study the usefulness of the proposed schemes in supporting algorithms for data-race detection and retentive steal- ing presented in the literature. We demonstrate that the perturbation due to tracing is within the variation in the execution time with 99% confidence and the traces are concise, amounting to a few tens of kilobytes per thread in most cases. We also demonstrate that the traces enable significant reductions in the cost of detecting data races and result in low, stable space overheads in supporting retentive stealing for async-finish programs.

  9. Overhead cam shaft type V-engine cylinder block

    SciTech Connect

    Tominaga, N.; Kurai, N.; Ueno, H.; Suzuki, S.

    1987-01-06

    This patent describes an overhead camshaft type V-engine having V-shaped cylinders equipped with and overhead camshaft drive by a timing chain disposed and arranged on either side of the cylinders at a right angle to a crankshaft. The improvement comprises: a cylinder block; a timing chain passage in the cylinder block, the passage housing the timing chain movement in a plane of the chain. The passage includes a spacing on each side of a pair of runs of the chain, and in the plane, the spacing on each side of a pair of runs of the chain being substantially the same; the block further including a wall at least partially bounding the spacings and intersecting the plane. The wall has symmetrical wall openings therethrough symmetrically disposed on opposite sides of the chain and its plane, and opening into a respective substantially same spacing; a plurality of chain guide means, each mounted in a respective substantially same spacing; and tensioning means resiliently biasing one of the chain guide means toward and against a run of the chain to place the chain in tension, at least a portion of the tensioning means being mounted in one of the symmetrical wall openings adjacent to the respective run. The symmetry of the symmetrical wall openings enable the tensioning means to be positioned adjacent to either run, whereby the cylinder block may be used for diametrically opposite cylinders.

  10. Rehabilitation of the Overhead Athlete’s Elbow

    PubMed Central

    Wilk, Kevin E.; Macrina, Leonard C.; Cain, E. Lyle; Dugas, Jeffrey R.; Andrews, James R.

    2012-01-01

    The activities required during overhead sports, particularly during baseball pitching, produce large forces at the elbow joint. Injuries to the elbow joint frequently occur in the overhead athlete because of the large amount of forces observed during the act of throwing, playing tennis, or playing golf. Injuries may result because of repetitive overuse, leading to tissue failure. Rehabilitation following injury or surgery to the throwing elbow is vital to fully restore normal function and return the athlete to competition as quickly and safely as possible. Rehabilitation of the elbow, whether following injury or postsurgical, must follow a progressive and sequential order, building on the previous phase, to ensure that healing tissues are not compromised. Emphasis is placed on restoring full motion, muscular strength, and neuromuscular control while gradually applying loads to healing tissue. In addition, when one is creating a rehabilitation plan for athletes, it is imperative to treat the entire upper extremity, core, and legs to create and dissipate the forces generated at each joint. PMID:23016113

  11. Detailed side and overhead views of geologic features from joint panoramic and blimp operations

    SciTech Connect

    Chase, T.E.; Young, J.D. )

    1990-06-01

    A portion of the California coast, including the Loma Prieta earthquake damage at Moss Landing, is shown with the topography displayed from side and overhead viewing angles. This technique offers a different approach to mapping shorelines and studying the oceanographic forces creating and shaping these geologic features. Two pieces of equipment were developed to create these views. The first is a panoramic camera with viewing angles up to 360{degree} and two telephoto settings (70mm and 210mm) allowing a feature to be photographed from the same point with different lens magnifications. The second is a 20 ft helium-filled blimp with 35mm cameras mounted in a tray with a radio control receiver triggering the camera shutters after receiving a signal transmitted from a person on the ground. Video camcorders can also be carried. Tethered to the person on the ground, the blimp's height is determined by the amount of line payed out. Horizontal movement of the blimp is controlled by the operator walking or riding slowly in a boat or truck. The blimp can be flown at different elevations, remain in a stationary position for time-lapse photographs, or be moved about to prepare a mosaic of the area. Both systems can be used in remote areas because they are portable and the power supplies needed to operate are from lightweight batteries.

  12. Development of sensorless easy-to-use overhead crane system via simulation based control

    NASA Astrophysics Data System (ADS)

    Tagawa, Yasutaka; Mori, Yoshihito; Wada, Masaomi; Kawajiri, Eisaku; Nouzuka, Kazuma

    2016-09-01

    This paper describes the newly developed overhead crane which has a sensorless vibration control system. Generally, loads which are carried by the overhead cranes are easy to vibrate and only skilled people can operate the cranes. Therefore, a lot of studies have been done to solve this problem by using feedback control with vibration sensors. However vibration sensors often break down in severe industrial environment and more reliable control systems are required. For this reason, we have been developing sensorless control system for overhead cranes. In this paper, we firstly introduce basic idea of simulation based control which is called IDCS, then overview and modeling of the overhead crane is presented. Next, the control system design of the overhead crane is discussed, and experimental results are shown for real overhead crane with 2 axes.

  13. Breakdown dynamics of electrically exploding thin metal wires in vacuum

    NASA Astrophysics Data System (ADS)

    Sarkisov, G. S.; Caplinger, J.; Parada, F.; Sotnikov, V. I.

    2016-10-01

    Using a two-frame intensified charge coupled device (iCCD) imaging system with a 2 ns exposure time, we observed the dynamics of voltage breakdown and corona generation in experiments of fast ns-time exploding fine Ni and stainless-steel (SS) wires in a vacuum. These experiments show that corona generation along the wire surface is subjected to temporal-spatial inhomogeneity. For both metal wires, we observed an initial generation of a bright cathode spot before the ionization of the entire wire length. This cathode spot does not expand with time. For 25.4 μm diameter Ni and SS wire explosions with positive polarity, breakdown starts from the ground anode and propagates to the high voltage cathode with speeds approaching 3500 km/s or approximately one percent of light speed.

  14. Thermal Model of a Current-Carrying Wire in a Vacuum

    NASA Technical Reports Server (NTRS)

    Border, James

    2006-01-01

    A computer program implements a thermal model of an insulated wire carrying electric current and surrounded by a vacuum. The model includes the effects of Joule heating, conduction of heat along the wire, and radiation of heat from the outer surface of the insulation on the wire. The model takes account of the temperature dependences of the thermal and electrical properties of the wire, the emissivity of the insulation, and the possibility that not only can temperature vary along the wire but, in addition, the ends of the wire can be thermally grounded at different temperatures. The resulting second-order differential equation for the steady-state temperature as a function of position along the wire is highly nonlinear. The wire is discretized along its length, and the equation is solved numerically by use of an iterative algorithm that utilizes a multidimensional version of the Newton-Raphson method.

  15. Flashover failures from wet-wire arcing and tracking

    NASA Astrophysics Data System (ADS)

    Campbell, F. J.

    1984-12-01

    Flashover failure occurs in a wire bundle as a high-energy surge between a bare conductor delivering power and a ground-plane (e.g., metal framework or wire shielding) as the conductive path across adjacent wires approaches zero resistance. It happens as a violent blazing flashover in which the copper of the bare wire melts and splatters - causing melting and burn-through of some of the adjacent wires in the bundle. Thus, it could produce the loss of a number of circuits at once. Under service stress conditions the process leading to a flashover could begin as the wire insulation initially deteriorates by cracking or chaffing and the surfaces of adjacent wires in the bundles become contaminated due to salt spray, mist, fog and high humidity. Under these conditions, typical of Naval aircraft service, arcing and tracking initiate and eventually localized spots extend into a continuous carbonaceous path, bridging the wires from the fault to ground. At some point the wetting is no longer necessary to sustain the current, and the flashover strikes. This phenomena is known to develop on the surfaces of polymeric materials that readily carbonize when pyrolized and the susceptibility to fail by this mechanism is characterized in standard arcing and tracking tests. The phenyl-containing polymeric materials fall into this class. Laboratory tests have demonstrated that flashover will occur on wires insulated with a hi-phenyl polyimide composite and also on wires insulated with a polyphenyl ketone polymer; whereas, two types of a polytetrafluoroethylene insulation did not carbonize or flashover in the test. These results are in agreement with other references on arcing and tracking studies.

  16. Software in the DOE: The Hidden Overhead of''The Build''

    SciTech Connect

    Kumfert, G; Epperly, T

    2002-02-28

    ''The Build'' is the infrastructure needed to convert software from source code to usable form. It is intimately tied to the software it supports, knowing about every file and automating every transformation needed to produce a working program. Every developer knows that a project spends some labor overhead on ''the build.'' How big is this hidden overhead? According to 34 scientific software developers we surveyed at Lawrence Livermore National Labs, among colleagues at other DOE labs, and a handful of academics the ''perceived'' overhead averages around 12%. Individual cases of 20% to 30% were not uncommon. In one project claiming a 20% overhead, we found supporting evidence by combing through their CVS repository.

  17. Cavitation during wire brushing

    NASA Astrophysics Data System (ADS)

    Li, Bo; Zou, Jun; Ji, Chen

    2016-11-01

    In our daily life, brush is often used to scrub the surface of objects, for example, teeth, pots, shoes, pool, etc. And cleaning rust and stripping paint are accomplished using wire brush. Wire brushes also can be used to clean the teeth for large animals, such as horses, crocodiles. By observing brushing process in water, we capture the cavitation phenomenon on the track of moving brush wire. It shows that the cavitation also can affect the surface. In order to take clear and entire pictures of cavity, a simplified model of one stainless steel wire brushing a boss is adopted in our experiment. A transparent organic tank filled with deionized water is used as a view box. And a high speed video camera is used to record the sequences. In experiment, ambient pressure is atmospheric pressure and deionized water temperature is kept at home temperature. An obvious beautiful flabellate cavity zone appears behind the moving steel wire. The fluctuation of pressure near cavity is recorded by a hydrophone. More movies and pictures are used to show the behaviors of cavitation bubble following a restoring wire. Beautiful tracking cavitation bubble cluster is captured and recorded to show.

  18. Superconducting wire manufactured

    NASA Astrophysics Data System (ADS)

    Fu, Yuexian; Sun, Yue; Xu, Shiming; Peng, Ying

    1985-10-01

    The MF Nb/Cu Extrusion Tube Method was used to manufacture 3 kg of stable practical MF Nb2Sn composite superconducting wire containing pure Cu(RRR approx. 200)/Ta. The draw state composite wire diameter was 0.56 mm, it contained 11,448 x 2.6 micron Nb core, and the twist distance was 1.5 cm. The composite wire cross-section was pure Cu/Ta/11,448 Nb core/Cu/ 91Sn-Cu; containing 22.8 v. % pure Cu, 13.3 v. % Ta; within the Ta layer to prevent Sn diffusion. The wire was sheathed in nonalkaline glass fiber as an insulating layer. A section of wire weighing 160 g was cut off and coiled it into a small solenoid. After reaction diffusion processing at 675 C/30 and curing by vacuum dipping in paraffin, it was measured in a Nb-Ti backfield of 7.2 T intensity, a current of 129 A was passed through the Nb3Sn solenoid and produced a strength of 2.5 T, the overall magnetic field intensity of the composite magnet reached 9.7 T. At this time, the wire full current density J sub c.w. = 5.2 x 10 to the 4th power A/sq cm; the effective current density J sub c (Nb + Sn - Cu) = 8.2 x 10 to the 4th power A/sq cm.

  19. Splicing Wires Permanently With Explosives

    NASA Technical Reports Server (NTRS)

    Bement, Laurence J.; Kushnick, Anne C.

    1990-01-01

    Explosive joining process developed to splice wires by enclosing and metallurgically bonding wires within copper sheets. Joints exhibit many desirable characteristics, 100-percent conductivity and strength, no heat-induced annealing, no susceptibility to corrosion in contacts between dissimilar metals, and stability at high temperature. Used to join wires to terminals, as well as to splice wires. Applicable to telecommunications industry, in which millions of small wires spliced annually.

  20. NASA/BAE SYSTEMS SpaceWire Effort

    NASA Technical Reports Server (NTRS)

    Rakow, Glenn Parker; Schnurr, Richard G.; Kapcio, Paul

    2003-01-01

    This paper discusses the state of the NASA and BAE SYSTEMS developments of SpaceWire. NASA has developed intellectual property that implements SpaceWire in Register Transfer Level (RTL) VHDL for a SpaceWire link and router. This design has been extensively verified using directed tests from the SpaceWire Standard and design specification, as well as being randomly tested to flush out hard to find bugs in the code. The high level features of the design will be discussed, including the support for multiple time code masters, which will be useful for the James Webb Space Telescope electrical architecture. This design is now ready to be targeted to FPGA's and ASICs. Target utilization and performance information will be presented for Spaceflight worthy FPGA's and a discussion of the ASIC implementations will be addressed. In particular, the BAE SYSTEMS ASIC will be highlighted which will be implemented on their .25micron rad-hard line. The chip will implement a 4-port router with the ability to tie chips together to make larger routers without external glue logic. This part will have integrated LVDS drivers/receivers, include a PLL and include skew control logic. It will be targeted to run at greater than 300 MHz and include the implementation for the proposed SpaceWire transport layer. The need to provide a reliable transport mechanism for SpaceWire has been identified by both NASA And ESA, who are attempting to define a transport layer standard that utilizes a low overhead, low latency connection oriented approach that works end-to-end. This layer needs to be implemented in hardware to prevent bottlenecks.

  1. 30 CFR 75.1003 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 75.1003 Section 75.1003... MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Trolley Wires and Trolley Feeder Wires §...

  2. 30 CFR 75.1003 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 75.1003 Section 75.1003... MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Trolley Wires and Trolley Feeder Wires §...

  3. 30 CFR 75.1003 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 75.1003 Section 75.1003... MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Trolley Wires and Trolley Feeder Wires §...

  4. Increased range of ultrasonic guided wave testing of overhead transmission line cables using dispersion compensation.

    PubMed

    Legg, Mathew; Yücel, Mehmet K; Kappatos, Vassilios; Selcuk, Cem; Gan, Tat-Hean

    2015-09-01

    Overhead Transmission Line (OVTL) cables can experience structural defects and are, therefore, inspected using Non-Destructive Testing (NDT) techniques. Ultrasonic Guided Waves (UGW) is one NDT technique that has been investigated for inspection of these cables. For practical use, it is desirable to be able to inspect as long a section of cable as possible from a single location. This paper investigates increasing the UGW inspection range on Aluminium Conductor Steel Reinforced (ACSR) cables by compensating for dispersion using dispersion curve data. For ACSR cables, it was considered to be difficult to obtain accurate dispersion curves using modelling due to the complex geometry and unknown coupling between wire strands. Group velocity dispersion curves were, therefore, measured experimentally on an untensioned, 26.5m long cable and a method of calculating theoretical dispersion curves was obtained. Attenuation and dispersion compensation were then performed for a broadband Maximum Length Sequence (MLS) excitation signal. An increase in the Signal to Noise Ratio (SNR) of about 4-8dB compared to that of the dispersed signal was obtained. However, the main benefit was the increased ability to resolve the individual echoes from the end of the cable and an introduced defect in the form of a cut, which was 7 to at least 13dB greater than that of the dispersed signal. Five echoes were able to be clearly detected using MLS excitation signal, indicating the potential for an inspection range of up to 130m in each direction. To the best of the authors knowledge, this is the longest inspection range for ACSR cables reported in the literature, where typically cables, which were only one or two meter long, have been investigated previously. Narrow band tone burst and Hann windowed tone burst excitation signal also showed increased SNR and ability to resolve closely spaced echoes.

  5. Reducing the quantum-computing overhead with complex gate distillation

    NASA Astrophysics Data System (ADS)

    Duclos-Cianci, Guillaume; Poulin, David

    2015-04-01

    In leading fault-tolerant quantum-computing schemes, accurate transformations are obtained by a two-stage process. In a first stage, a discrete universal set of fault-tolerant operations is obtained by error-correcting noisy transformations and distilling resource states. In a second stage, arbitrary transformations are synthesized to desired accuracy by combining elements of this set into a circuit. Here we present a scheme that merges these two stages into a single one, directly distilling complex transformations. We find that our scheme can reduce the total overhead to realize certain gates by up to a few orders of magnitude. In contrast to other schemes, this efficient gate synthesis does not require computationally intensive compilation algorithms and a straightforward generalization of our scheme circumvents compilation and synthesis altogether.

  6. Wearable IMU for Shoulder Injury Prevention in Overhead Sports.

    PubMed

    Rawashdeh, Samir A; Rafeldt, Derek A; Uhl, Timothy L

    2016-11-03

    Body-worn inertial sensors have enabled motion capture outside of the laboratory setting. In this work, an inertial measurement unit was attached to the upper arm to track and discriminate between shoulder motion gestures in order to help prevent shoulder over-use injuries in athletics through real-time preventative feedback. We present a detection and classification approach that can be used to count the number of times certain motion gestures occur. The application presented involves tracking baseball throws and volleyball serves, which are common overhead movements that can lead to shoulder and elbow overuse injuries. Eleven subjects are recruited to collect training, testing, and randomized validation data, which include throws, serves, and seven other exercises that serve as a large null class of similar movements, which is analogous to a realistic usage scenario and requires a robust estimator.

  7. Wearable IMU for Shoulder Injury Prevention in Overhead Sports

    PubMed Central

    Rawashdeh, Samir A.; Rafeldt, Derek A.; Uhl, Timothy L.

    2016-01-01

    Body-worn inertial sensors have enabled motion capture outside of the laboratory setting. In this work, an inertial measurement unit was attached to the upper arm to track and discriminate between shoulder motion gestures in order to help prevent shoulder over-use injuries in athletics through real-time preventative feedback. We present a detection and classification approach that can be used to count the number of times certain motion gestures occur. The application presented involves tracking baseball throws and volleyball serves, which are common overhead movements that can lead to shoulder and elbow overuse injuries. Eleven subjects are recruited to collect training, testing, and randomized validation data, which include throws, serves, and seven other exercises that serve as a large null class of similar movements, which is analogous to a realistic usage scenario and requires a robust estimator. PMID:27827880

  8. Hydro-mechanical overhead for internal combustion engine

    SciTech Connect

    Meistrick, Z.S.; Price, R.B.

    1987-05-12

    This patent describes a hydro-mechanical overhead for a multi-cylinder four-cycle internal combustion engine having a camshaft, intake valve pushtube means driven by the camshaft, exhaust valve pushtube means driven by the camshaft, at least one intake and exhaust valve for each cylinder of the multi-cylinder internal combustion engines and a piston for each cylinder of the engine. The process comprises an intake valve master piston means for each engine cylinder. Each intake valve master piston means is driven by one of the intake valve pushtube means. There is an exhaust valve master piston means for each engine cylinder, and each exhaust valve master piston means is driven by one of the exhaust valve pushtube means.

  9. Phase Sensitive Cueing for 3D Objects in Overhead Images

    SciTech Connect

    Paglieroni, D W; Eppler, W G; Poland, D N

    2005-02-18

    A 3D solid model-aided object cueing method that matches phase angles of directional derivative vectors at image pixels to phase angles of vectors normal to projected model edges is described. It is intended for finding specific types of objects at arbitrary position and orientation in overhead images, independent of spatial resolution, obliqueness, acquisition conditions, and type of imaging sensor. It is shown that the phase similarity measure can be efficiently evaluated over all combinations of model position and orientation using the FFT. The highest degree of similarity over all model orientations is captured in a match surface of similarity values vs. model position. Unambiguous peaks in this surface are sorted in descending order of similarity value, and the small image thumbnails that contain them are presented to human analysts for inspection in sorted order.

  10. Thermal Testing and Integration: Magnetospheric MultiScale (MMS) Observatories with Digital 1-Wire Sensors

    NASA Technical Reports Server (NTRS)

    Solimani, Jason A.; Rosanova, Santino

    2015-01-01

    Thermocouples require two thin wires to be routed out of the spacecraft to connect to the ground support equipment used to monitor and record the temperature data. This large number of wires that exit the observatory complicates integration and creates an undesirable heat path during testing. These wires exiting the spacecraft need to be characterized as a thermal short that will not exist during flight. To minimize complexity and reduce thermal variables from these ground support equipment (GSE) wires, MMS pursued a hybrid path for temperature monitoring, utilizing thermocouples and digital 1-wire temperature sensors. Digital 1-wire sensors can greatly reduce harness mass, length and complexity as they can be spliced together. For MMS, 350 digital 1-wire sensors were installed on the spacecraft with only 18 wires exiting as opposed to a potential 700 thermocouple wires. Digital 1-wire sensors had not been used in such a large scale at NASAGSFC prior to the MMS mission. During the MMS thermal vacuum testing a lessons learned matrix was formulated that will assist future integration of 1-wires into thermal testing and one day into flight.

  11. How To Prepare Effective Overhead Projector Presentations: One Picture Is Worth a Thousand Words.

    ERIC Educational Resources Information Center

    National Audio-Visual Supply, East Rutherford, NJ.

    Designed to help create effective presentations, this guide describes the basic techniques and provides hints for producing professional, attention-getting overhead transparencies in a step-by-step procedure format. Eight topics are addressed in the guide: (1) eight steps to a successful meeting presentation; (2) advantages of overhead projection;…

  12. 30 CFR 57.19110 - Overhead protection for shaft deepening work.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Overhead protection for shaft deepening work... NONMETAL MINES Personnel Hoisting Shafts § 57.19110 Overhead protection for shaft deepening work. A substantial bulkhead or equivalent protection shall be provided above persons at work deepening a shaft....

  13. 30 CFR 56.19110 - Overhead protection for shaft deepening work.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Overhead protection for shaft deepening work... MINES Personnel Hoisting Shafts § 56.19110 Overhead protection for shaft deepening work. A substantial bulkhead or equivalent protection shall be provided above persons at work deepening a shaft....

  14. 31 CFR Appendix I(f) to Part 13 - Estimated Overhead and Administrative Costs

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Estimated Overhead and Administrative Costs I(F) Appendix I(F) to Part 13 Money and Finance: Treasury Office of the Secretary of the Treasury... Pt. 13, App. I(F) Appendix I(F) to Part 13—Estimated Overhead and Administrative Costs Date:...

  15. 31 CFR Appendix I(f) to Part 13 - Estimated Overhead and Administrative Costs

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Estimated Overhead and Administrative Costs I(F) Appendix I(F) to Part 13 Money and Finance: Treasury Office of the Secretary of the Treasury... Pt. 13, App. I(F) Appendix I(F) to Part 13—Estimated Overhead and Administrative Costs Date:...

  16. 31 CFR Appendix II(f) to Part 13 - Overhead and Administrative Costs

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Overhead and Administrative Costs II(F) Appendix II(F) to Part 13 Money and Finance: Treasury Office of the Secretary of the Treasury... Pt. 13, App. II(F) Appendix II(F) to Part 13—Overhead and Administrative Costs Date: Select Only...

  17. 31 CFR Appendix II(f) to Part 13 - Overhead and Administrative Costs

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Overhead and Administrative Costs II(F) Appendix II(F) to Part 13 Money and Finance: Treasury Office of the Secretary of the Treasury... Pt. 13, App. II(F) Appendix II(F) to Part 13—Overhead and Administrative Costs Date: Select Only...

  18. 31 CFR Appendix I(f) to Part 13 - Estimated Overhead and Administrative Costs

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Estimated Overhead and Administrative Costs I(F) Appendix I(F) to Part 13 Money and Finance: Treasury Office of the Secretary of the Treasury... Pt. 13, App. I(F) Appendix I(F) to Part 13—Estimated Overhead and Administrative Costs Date:...

  19. 31 CFR Appendix I(f) to Part 13 - Estimated Overhead and Administrative Costs

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Estimated Overhead and Administrative Costs I(F) Appendix I(F) to Part 13 Money and Finance: Treasury Office of the Secretary of the Treasury... Pt. 13, App. I(F) Appendix I(F) to Part 13—Estimated Overhead and Administrative Costs Date:...

  20. Wire brush fastening device

    DOEpatents

    Meigs, Richard A.

    1995-01-01

    A fastening device is provided which is a variation on the conventional nut and bolt. The bolt has a longitudinal axis and threading helically affixed thereon along the longitudinal axis. A nut having a bore extending therethrough is provided. The bore of the nut has a greater diameter than the diameter of the bolt so the bolt can extend through the bore. An array of wire bristles are affixed within the bore so as to form a brush. The wire bristles extend inwardly from the bore and are constructed and arranged of the correct size, length and stiffness to guide the bolt within the bore and to restrain the bolt within the bore as required. A variety of applications of the wire brush nut are disclosed, including a bolt capture device and a test rig apparatus.

  1. Wire brush fastening device

    DOEpatents

    Meigs, R.A.

    1995-09-19

    A fastening device is provided which is a variation on the conventional nut and bolt. The bolt has a longitudinal axis and threading helically affixed thereon along the longitudinal axis. A nut having a bore extending therethrough is provided. The bore of the nut has a greater diameter than the diameter of the bolt so the bolt can extend through the bore. An array of wire bristles are affixed within the bore so as to form a brush. The wire bristles extend inwardly from the bore and are constructed and arranged of the correct size, length and stiffness to guide the bolt within the bore and to restrain the bolt within the bore as required. A variety of applications of the wire brush nut are disclosed, including a bolt capture device and a test rig apparatus. 13 figs.

  2. Flying wires at Fermilab

    SciTech Connect

    Gannon, J.; Crawford, C.; Finley, D.; Flora, R.; Groves, T.; MacPherson, M.

    1989-03-01

    Transverse beam profile measurement systems called ''Flying Wires'' have been installed and made operational in the Fermilab Main Ring and Tevatron accelerators. These devices are used routinely to measure the emittance of both protons and antiprotons throughout the fill process, and for emittance growth measurements during stores. In the Tevatron, the individual transverse profiles of six proton and six antiproton bunches are obtained simultaneously, with a single pass of the wire through the beam. Essential features of the hardware, software, and system operation are explained in the rest of the paper. 3 refs., 4 figs.

  3. One hundred angstrom niobium wire

    NASA Technical Reports Server (NTRS)

    Cline, H. E.; Rose, R. M.; Wulff, J.

    1968-01-01

    Composite of fine niobium wires in copper is used to study the size and proximity effects of a superconductor in a normal matrix. The niobium rod was drawn to a 100 angstrom diameter wire on a copper tubing.

  4. Wiring for space applications program

    NASA Astrophysics Data System (ADS)

    Hammoud, Ahmad

    1994-01-01

    The insulation testing and analysis consists of: identifying and prioritizing NASA wiring requirements; selecting candidate wiring constructions; developing test matrix and formulating test program; managing, coordinating, and conducting tests; and analyzing and documenting data, establishing guidelines and recommendations.

  5. LANSCE wire scanner AFE: analysis, design, and fabrication

    SciTech Connect

    Gruchalla, Mike; Chacon, Phillip; Gilpatrick, John D; Martinez, Derwin; Power, John F; Smith, Brian

    2010-01-01

    The goal of the design LANSCE-R Wire-Scanner Analog Front-end Electronics is to develop a high-performance, dual-axis wire-scanner analog front-end system implemented in a single cRIO module. This new design accommodates macropulse widths as wide as 700 {mu}s at a maximum pulse rate of 120Hz. A lossey integrator is utilized as the integration element to eliminate the requirement for providing gating signals to each wire scanner. The long macropulse and the high repetition rate present conflicting requirements for the design of the integrator. The long macropulse requires a long integration time constant to assure minimum integrator droop for accurate charge integration, and the high repetition rate requires a short time constant to assure adequate integrator reset between macropulses. Also, grounding is a serious concern due to the small signal levels. This paper reviews the basic Wire Scanner AFE system design implemented in the cRIO-module form factor to capture the charge information from the wire sensors and the grounding topology to assure minimum noise contamination of the wire signals.

  6. Gaseous wire detectors

    SciTech Connect

    Va'vra, J.

    1997-08-01

    This article represents a series of three lectures describing topics needed to understand the design of typical gaseous wire detectors used in large high energy physics experiments; including the electrostatic design, drift of electrons in the electric and magnetic field, the avalanche, signal creation, limits on the position accuracy as well as some problems one encounters in practical operations.

  7. SCALING UNDERWATER EXPLODING WIRES

    DTIC Science & Technology

    heat of detonation of TNT in calories per gram. This scaling behavior extends the law of similarity six decades in terms of weight, from pounds to micropounds. The peak pressure for exploding-wire phenomena has been obtained from data and is emprically expressed as pm = 26,800 (cube root of W/R) to

  8. Basic Wiring. Second Edition.

    ERIC Educational Resources Information Center

    Kaltwasser, Stan; And Others

    This guide is designed to assist teachers conducting a foundation course to prepare students for additional courses of training for entry-level employment in either the residential or commercial and industrial wiring trades. Included in the guide are 17 instructional units and the following sections of information for teachers: guidelines in using…

  9. Residential Wiring. Revised.

    ERIC Educational Resources Information Center

    Taylor, Mark

    This competency-based curriculum guide contains materials for conducting a course in residential wiring. A technically revised edition of the 1978 publication, the guide includes 28 units. Each instructional unit includes some or all of the following basic components: performance objectives, suggested activities for teachers and students,…

  10. NewsWire, 2002.

    ERIC Educational Resources Information Center

    Byrom, Elizabeth, Ed.; Bingham, Margaret, Ed.; Bowman, Gloria, Ed.; Shoemaker, Dan, Ed.

    2002-01-01

    This document presents the 3 2002 issues of the newsletter "NewsWire," (volume 5). Issue Number One focuses on collaborative Web projects. This issue begins with descriptions of four individual projects: "iEARN"; "Operation RubyThroat"; "Follow the Polar Huskies!"; and "Log in Your Animal Roadkill!" Features that follow include: "Bringing the…

  11. One-wire thermocouple

    NASA Technical Reports Server (NTRS)

    Goodrich, W. D.; Staimach, C. J.

    1977-01-01

    Nickel alloy/constantan device accurately measures surface temperature at precise locations. Device is moderate in cost and simplifies fabrication of highly-instrumented seamless-surface heat-transfer models. Device also applies to metal surfaces if constantan wire has insulative coat.

  12. Debate: Wired versus Wireless.

    ERIC Educational Resources Information Center

    Meeks, Glenn; Nair, Prakash

    2000-01-01

    Debates the issue of investing in wiring schools for desktop computer networks versus using laptops and wireless networks. Included are cost considerations and the value of technology for learning. Suggestions include using wireless networks for existing schools, hardwiring computers for new construction, and not using computers for elementary…

  13. Improved wire chamber

    DOEpatents

    Atac, M.

    1987-05-12

    An improved gas mixture for use with proportional counter devices, such as Geiger-Mueller tubes and drift chambers. The improved gas mixture provides a stable drift velocity while eliminating wire aging caused by prior art gas mixtures. The new gas mixture is comprised of equal parts argon and ethane gas and having approximately 0.25% isopropyl alcohol vapor. 2 figs.

  14. A World without Wires

    ERIC Educational Resources Information Center

    Panettieri, Joseph C.

    2006-01-01

    The wireless bandwagon is rolling across Mississippi, picking up a fresh load of converts and turning calamity into opportunity. Traditional wired school networks, many of which unraveled during Hurricane Katrina, are giving way to advanced wireless mesh networks that frequently include voice-over-IP (VoIP) capabilities. Vendor funding is helping…

  15. Residential Wiring. Second Edition.

    ERIC Educational Resources Information Center

    Taylor, Mark; And Others

    This guide is designed to assist teachers conducting a course to prepare students for entry-level employment in the residential wiring trade. Included in the guide are six instructional units and the following sections of information for teachers: guidelines in using the unit components; academic and workplace skills classifications and…

  16. Overhead camshaft engine valve train with slack take up means

    SciTech Connect

    Hayashi, Y.

    1987-03-03

    A valve train of an overhead camshaft engine is described comprising: a valve stem; a valve operating cam; a rocker arm operatively engaged with the valve stem and the cam for transferring motion from the cam to the valve stem and having at a part where it is operatively engaged with the cam a hole; a tappet reciprocatingly mounted in the hole in a manner to define an oil pressure chamber variable in volume in accordance with actual movement of the tappet and having an end protruding from the rocker arm to contact the cam; a source of pressurized oil; passageway means for providing communication between the source of pressurized oil and the oil pressure chamber; check valve means operatively connected with the passageway means for preventing a return flow out of the oil pressure chamber; a spring disposed in the oil pressure chamber to urge the tappet in the direction causing the oil pressure chamber to increase in volume to thereby take up slack in the valve train; and an oil releasing passageway having one end opening directly into the uppermost part of the oil pressure chamber and another end opening to the outside of the rocker arm.

  17. Extending wire rope service life

    SciTech Connect

    Not Available

    1982-06-01

    Selecting the proper wire rope is not a simple procedure. Wire rope is a precision mining machine with scores of moving parts. It is therefore important for mining equipment users to know wire rope and how it is designed and constructed. Good lubrication and regular inspection is important for a safe and long service life.

  18. Fatigue during prolonged intermittent overhead work: reliability of measures and effects of working height.

    PubMed

    Sood, Deepti; Nussbaum, Maury A; Hager, Kris

    2007-04-01

    Shoulder pain is prevalent among industrial workers and existing evidence supports that overhead work is an important specific risk factor. Existing guidelines are limited, with overhead work typically recommended to be avoided, and research on overhead work has been mixed in terms of the effects of increasing arm reach. A laboratory-based simulation of overhead work was conducted, at three working heights, in order to facilitate improved guidelines and to identify potential non-linear effects of overhead work height. Several indicators of shoulder fatigue served as outcome measures and a preliminary study was performed to assess the reliability of several of these measures. Fatigue measures based on electromyography (EMG) generally had low reliability, whereas excellent reliability was exhibited for ratings of perceived discomfort (RPD). Consistent with this, no effects of overhead work height were found on EMG-based measures, yet clear non-linear effects were found on RPD and task performance. The source of the effects of work height appeared to be related to a combination of muscle activation levels and demands on precision/control at the highest location. These results support the utility of subjective measures for relatively low-level intermittent exertions and demonstrate increasingly detrimental fatigue and performance effects at extremes in reach during overhead work.

  19. 46 CFR 111.60-11 - Wire.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Wire. 111.60-11 Section 111.60-11 Shipping COAST GUARD... Wiring Materials and Methods § 111.60-11 Wire. (a) Wire must be in an enclosure. (b) Wire must be component insulated. (c) Wire, other than in switchboards, must meet the requirements in sections 24.6.7...

  20. 46 CFR 111.60-11 - Wire.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Wire. 111.60-11 Section 111.60-11 Shipping COAST GUARD... Wiring Materials and Methods § 111.60-11 Wire. (a) Wire must be in an enclosure. (b) Wire must be component insulated. (c) Wire, other than in switchboards, must meet the requirements in sections 24.6.7...

  1. 46 CFR 111.60-11 - Wire.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Wire. 111.60-11 Section 111.60-11 Shipping COAST GUARD... Wiring Materials and Methods § 111.60-11 Wire. (a) Wire must be in an enclosure. (b) Wire must be component insulated. (c) Wire, other than in switchboards, must meet the requirements in sections 24.6.7...

  2. 46 CFR 111.60-11 - Wire.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Wire. 111.60-11 Section 111.60-11 Shipping COAST GUARD... Wiring Materials and Methods § 111.60-11 Wire. (a) Wire must be in an enclosure. (b) Wire must be component insulated. (c) Wire, other than in switchboards, must meet the requirements in sections 24.6.7...

  3. 46 CFR 111.60-11 - Wire.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Wire. 111.60-11 Section 111.60-11 Shipping COAST GUARD... Wiring Materials and Methods § 111.60-11 Wire. (a) Wire must be in an enclosure. (b) Wire must be component insulated. (c) Wire, other than in switchboards, must meet the requirements in sections 24.6.7...

  4. 75 FR 44288 - Overhead and Gantry Cranes; Extension of the Office of Management and Budget's (OMB) Approval of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-28

    ... Occupational Safety and Health Administration Overhead and Gantry Cranes; Extension of the Office of Management...) approval of the information collection requirements specified in the Standard on Overhead and Gantry Cranes... is a result of new information showing that there are 31,495 overhead and gantry cranes in use,...

  5. 78 FR 68477 - Overhead and Gantry Cranes; Extension of the Office of Management and Budget's (OMB) Approval of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-14

    ... Occupational Safety and Health Administration Overhead and Gantry Cranes; Extension of the Office of Management...) approval of the information collection requirements specified in the Standard on Overhead and Gantry Cranes... Standard on Overhead and Gantry Cranes specify requirements for: Marking the rated load of cranes;...

  6. 29 CFR 1926.1003 - Overhead protection for operators of agricultural and industrial tractors used in construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... REGULATIONS FOR CONSTRUCTION Rollover Protective Structures; Overhead Protection § 1926.1003 Overhead...) Purpose. When overhead protection is provided on wheel-type agricultural and industrial tractors, the... accidental upset. (2) Applicability. This standard applies to wheel-type agricultural and industrial...

  7. 29 CFR 1926.1003 - Overhead protection for operators of agricultural and industrial tractors used in construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... REGULATIONS FOR CONSTRUCTION Rollover Protective Structures; Overhead Protection § 1926.1003 Overhead...) Purpose. When overhead protection is provided on wheel-type agricultural and industrial tractors, the... accidental upset. (2) Applicability. This standard applies to wheel-type agricultural and industrial...

  8. 29 CFR 1926.1003 - Overhead protection for operators of agricultural and industrial tractors used in construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... REGULATIONS FOR CONSTRUCTION Rollover Protective Structures; Overhead Protection § 1926.1003 Overhead...) Purpose. When overhead protection is provided on wheel-type agricultural and industrial tractors, the... accidental upset. (2) Applicability. This standard applies to wheel-type agricultural and industrial...

  9. 29 CFR 1926.1003 - Overhead protection for operators of agricultural and industrial tractors used in construction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... REGULATIONS FOR CONSTRUCTION Rollover Protective Structures; Overhead Protection § 1926.1003 Overhead...) Purpose. When overhead protection is provided on wheel-type agricultural and industrial tractors, the... accidental upset. (2) Applicability. This standard applies to wheel-type agricultural and industrial...

  10. Autonomous Commanding of the WIRE Spacecraft

    NASA Technical Reports Server (NTRS)

    Prior, Mike; Walyus, Keith; Saylor, Rick

    1999-01-01

    This paper presents the end-to-end design architecture for an autonomous commanding capability to be used on the Wide Field Infrared Explorer (WIRE) mission for the uplink of command loads during unattended station contacts. The WIRE mission is the fifth and final mission of NASA's Goddard Space Flight Center Small Explorer (SMEX) series to be launched in March of 1999. Its primary mission is the targeting of deep space fields using an ultra-cooled infrared telescope. Due to its mission design WIRE command loads are large (approximately 40 Kbytes per 24 hours) and must be performed daily. To reduce the cost of mission operations support that would be required in order to uplink command loads, the WIRE Flight Operations Team has implemented an autonomous command loading capability. This capability allows completely unattended operations over a typical two- day weekend period. The key factors driving design and implementation of this capability were: 1) Integration with already existing ground system autonomous capabilities and systems, 2) The desire to evolve autonomous operations capabilities based upon previous SMEX operations experience 3) Integration with ground station operations - both autonomous and man-tended, 4) Low cost and quick implementation, and 5) End-to-end system robustness. A trade-off study was performed to examine these factors in light of the low-cost, higher-risk SMEX mission philosophy. The study concluded that a STOL (Spacecraft Test and Operations Language) based script, highly integrated with other scripts used to perform autonomous operations, was best suited given the budget and goals of the mission. Each of these factors is discussed to provide an overview of the autonomous operations capabilities implemented for the mission. The capabilities implemented on the WIRE mission are an example of a low-cost, robust, and efficient method for autonomous command loading when implemented with other autonomous features of the ground system. They

  11. Dental Arch Wire

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Straightening teeth is an arduous process requiring months, often years, of applying corrective pressure by means of arch wires-better known as brace-which may have to be changed several times in the course of treatment. A new method has been developed by Dr. George Andreasen, orthodontist and dental scientist at the University of Iowa. The key is a new type of arch wire material, called Nitinol, with exceptional elasticity which helps reduce the required number of brace changes. An alloy of nickel and titanium, Nitinol was originally developed for aerospace applications by the Naval Ordnance Laboratory, now the Naval Surface Weapons Laboratory, White Oaks, Maryland. NASA subsequently conducted additional research on the properties of Nitinol and on procedures for processing the metal.

  12. From wires to cosmology

    NASA Astrophysics Data System (ADS)

    Amin, Mustafa A.; Baumann, Daniel

    2016-02-01

    We provide a statistical framework for characterizing stochastic particle production in the early universe via a precise correspondence to current conduction in wires with impurities. Our approach is particularly useful when the microphysics is uncertain and the dynamics are complex, but only coarse-grained information is of interest. We study scenarios with multiple interacting fields and derive the evolution of the particle occupation numbers from a Fokker-Planck equation. At late times, the typical occupation numbers grow exponentially which is the analog of Anderson localization for disordered wires. Some statistical features of the occupation numbers show hints of universality in the limit of a large number of interactions and/or a large number of fields. For test cases, excellent agreement is found between our analytic results and numerical simulations.

  13. Plated wire memory subsystem

    NASA Technical Reports Server (NTRS)

    Reynolds, L.; Tweed, H.

    1972-01-01

    The work performed entailed the design, development, construction and testing of a 4000 word by 18 bit random access, NDRO plated wire memory for use in conjunction with a spacecraft imput/output unit and central processing unit. The primary design parameters, in order of importance, were high reliability, low power, volume and weight. A single memory unit, referred to as a qualification model, was delivered.

  14. Superconducting magnet wire

    DOEpatents

    Schuller, Ivan K.; Ketterson, John B.; Banerjee, Indrajit

    1986-01-01

    A superconducting tape or wire with an improved critical field is formed of alternating layers of a niobium-containing superconductor such as Nb, NbTi, Nb.sub.3 Sn or Nb.sub.3 Ge with a thickness in the range of about 0.5-1.5 times its coherence length, supported and separated by layers of copper with each copper layer having a thickness in the range of about 170-600 .ANG..

  15. Printed wiring assembly cleanliness

    SciTech Connect

    Stephens, J.M.

    1992-12-01

    This work installed a product cleanliness test capability in a manufacturing environment. A previously purchased testing device was modified extensively and installed in a production department. The device, the testing process, and some soldering and cleaning variables were characterized to establish their relationship to the device output. The characterization provided information which will be required for cleanliness testing to be an adequate process control of printed wiring assembly soldering and cleaning processes.

  16. Wiring for aerospace applications

    NASA Technical Reports Server (NTRS)

    Christian, J. L., Jr.; Dickman, J. E.; Bercaw, R. W.; Myers, I. T.; Hammoud, A. N.; Stavnes, M.; Evans, J.

    1992-01-01

    In this paper, the authors summarize the current state of knowledge of arc propagation in aerospace power wiring and efforts by the National Aeronautics and Space Administration (NASA) towards the understanding of the arc tracking phenomena in space environments. Recommendations will be made for additional testing. A database of the performance of commonly used insulating materials will be developed to support the design of advanced high power missions, such as Space Station Freedom and Lunar/Mars Exploration.

  17. Autonomous Command Operations of the WIRE Spacecraft

    NASA Technical Reports Server (NTRS)

    Walyus, Keith; Prior, Mike; Saylor, Richard

    1999-01-01

    This paper presents operational innovations which will be introduced on NASA's Wide Field Infrared Explorer (WIRE) mission. These innovations include an end-to-end design architecture for an autonomous commanding capability for the uplink of command loads during unattended station contacts. The WIRE mission is the fifth and final mission of NASA's Goddard Space Flight Center Small Explorer (SMEX) series to be launched in March of 1999. Its primary mission is the targeting of deep space fields using an ultra-cooled infrared telescope. Due to its mission design WIRE command loads are large (approximately 40 Kbytes per 24 hours) and must be performed daily. To reduce the cost of mission operations support that would be required in order to uplink command loads, the WIRE Flight Operations Team has implemented all autonomous command loading capability. This capability allows completely unattended operations over a typical two-day weekend period. The key factors driving design and implementation of this capability were: 1) integration with already existing ground system autonomous capabilities and systems, 2) the desire to evolve autonomous operations capabilities based upon previous SMEX operations experience - specifically the TRACE mission, 3) integration with ground station operations - both autonomous and man-tended, 4) low cost and quick implementation, and 5) end-to-end system robustness. A trade-off study was performed to examine these factors in light of the low-cost, higher-risk SMEX mission philosophy. The study concluded that a STOL (Spacecraft Test and Operations Language) based script, highly integrated with other scripts used to perform autonomous operations, was best suited given the budget and goals of the mission. Each of these factors is discussed in addition to use of the TRACE mission as a testbed for autonomous commanding prior to implementation on WIRE. The capabilities implemented on the WIRE mission are an example of a low-cost, robust, and

  18. Magnetoconductance of quantum wires

    NASA Astrophysics Data System (ADS)

    Ferreira, Gerson J.; Sammarco, Filipe; Egues, Carlos

    2010-03-01

    At low temperatures the conductance of a quantum wires exhibit characteristic plate-aus due to the quantization of the transverse modes [1]. In the presence of high in-plane magnetic fields these spin-split transverse modes cross. Recently, these crossings were observed experimentally [2] via measurements of the differential conductance as a function of the gate voltage and the in-plane magnetic-field. These show structures described as either anti-crossings or magnetic phase transitions. Motivated by our previous works on magnetotransport in 2DEGs via the Spin Density Functional Theory (SDFT) [3], here we propose a similar model to investigate the magnetoconductance of quantum wires. We use (i) the SDFT via the Kohn-Sham self-consistent scheme within the local spin density approximation to obtain the electronic structure and (ii) the Landauer-Buettiker formalism to calculate the conductance of a quantum wire. Our results show qualitative agreement with the data of Ref. [2]. [1] B. J. van Wees et al., Phys. Rev. Lett. 60, 848 (1988). [2] A. C. Graham et al., Phys. Rev. Lett. 100, 226804 (2008). [3] H. J. P. Freire, and J. C. Egues, Phys. Rev. Lett. 99, 026801 (2007); G. J. Ferreira, and J. Carlos Egues, J. Supercond. Nov. Mag., in press; G. J. Ferreira, H. J. P. Freire, J. Carlos Egues, submitted.

  19. Steel tanks T5 and T4 with overhead pipeline between. Redwood ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Steel tanks T5 and T4 with overhead pipeline between. Redwood tanks seen in background - Hawaii Volcanoes National Park Water Collection System, Hawaii Volcanoes National Park, Volcano, Hawaii County, HI

  20. Detail, cyclops 15ton overhead traveling crane and rails running the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Detail, cyclops 15-ton overhead traveling crane and rails running the length of the building - Wellton-Mohawk Irrigation System, Pumping Plant No. 1, Bounded by Gila River & Union Pacific Railroad, Wellton, Yuma County, AZ

  1. 15. VIEW OF THE ORIGINAL 10TON OVERHEAD NILES TRAVELING CRANE. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. VIEW OF THE ORIGINAL 10-TON OVERHEAD NILES TRAVELING CRANE. - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  2. Detail, 25ton overhead traveling crane built by The Craneveyor Corporation, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Detail, 25-ton overhead traveling crane built by The Craneveyor Corporation, Los Angeles, California - Wellton-Mohawk Irrigation System, Pumping Plant No. 3, South of Interstate 8, Wellton, Yuma County, AZ

  3. 49 CFR 234.213 - Grounds.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Grounds. 234.213 Section 234.213 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF... internal to semiconductor-based memory; and (5) Common return wires of grounded common return single...

  4. Dual wire welding torch and method

    DOEpatents

    Diez, Fernando Martinez; Stump, Kevin S.; Ludewig, Howard W.; Kilty, Alan L.; Robinson, Matthew M.; Egland, Keith M.

    2009-04-28

    A welding torch includes a nozzle with a first welding wire guide configured to orient a first welding wire in a first welding wire orientation, and a second welding wire guide configured to orient a second welding wire in a second welding wire orientation that is non-coplanar and divergent with respect to the first welding wire orientation. A method of welding includes moving a welding torch with respect to a workpiece joint to be welded. During moving the welding torch, a first welding wire is fed through a first welding wire guide defining a first welding wire orientation and a second welding wire is fed through a second welding wire guide defining a second welding wire orientation that is divergent and non-coplanar with respect to the first welding wire orientation.

  5. Matrix Interconnection System for Aircraft Wiring

    DTIC Science & Technology

    1975-07-01

    Aircraft Wiring, ECOM-0102-1, Feb. I973 mmmmMam "" \\:.-JLl.- *"’" " ’^nf--’--^7 -w .mm-m .mm BSU! (2) obtain due to the classified nature of the...steps 2 and 3 of MODE 2 to operate the intercoms. 2’ TTpe gtpp 1 of MODE 3 tn opprnte the compass. Do not rotate the SITS, MODE 10 This test is to be...TABLE II TABLE III TABLE IV MODES OF OPERATION MATRIX OH- GA HELICOPTER EMC EVALUATION OH- GA HELICOPTER EMC EVALUATION TEST SUMMARY GROUND TEST

  6. Calculation of induced voltages on overhead lines caused by inclined lightning strokes

    SciTech Connect

    Sakakibara, A.

    1989-01-01

    Equations to calculate the inducing scalar and vector potentials produced by inclined return strokes are shown. Equations are also shown for calculating the induced voltages on overhead lines where horizontal components of inducing vector potential exist. The adequacy of the calculation method is demonstrated by field experiments. Using these equations, induced voltages on overhead lines are calculated for a variety of directions of return strokes.

  7. [Current concepts in the diagnosis and rehabilitation of the shoulder in overhead athletes].

    PubMed

    Gokeler, A; Lehmann, M; Knopf, E; Freiwald, J

    2003-03-01

    The purpose of this paper is to present the general guidelines, including implementation of principles of motor learning in the course of the rehabilitation of the shoulder in overhead athletes. The focus is on treating the most common injury pattern of overhead athletes being rotator cuff pathology with secondary bursitis and finally microtraumatic instability. Specific criteria are discussed to determine when the athlete can return to unrestricted sport participation.

  8. Comparison of Civilian and Military Overhead Spending: Three Case Studies. Revision.

    DTIC Science & Technology

    1984-09-17

    aDesignations used by the Defense Housing Management Systems Office. TABLE 4 CIVILIAN HOUSING MAINTENANCE SPENDING VS. AGEa (Single unit, owner occupied...I-t9 ONCOMlPARISON OF CIVILIRN iND MILITARY OVERHEAD SPENDING : ,l THREE CASE STUDIES.. (U) CENTER FOR NAVAL ANALYSES RLEXADRIA YR NAVAL PLRNNING RND...ftFL RESEARCH MEMORANDUM 0 COMPARISON OF CIVILIAN AND MILITARY OVERHEAD SPENDING : I THREE CASE STUDIES Daniel B. Levine Colin P. Hammon DTIC ELECTE K

  9. Manually Operated Welding Wire Feeder

    NASA Technical Reports Server (NTRS)

    Rybicki, Daniel J. (Inventor)

    2001-01-01

    A manual welding wire feeder apparatus comprising a bendable elongate metal frame with a feed roller mounted at the center thereof for rotation about an axis transverse to the longitudinal axis of the frame. The frame ends are turned up as tabs and each provided with openings in alignment with each other and the mid-width center of the roller surface. The tab openings are sized to accommodate welding wire and each extends to a side edge of the tab, both opening on the same side of the frame, whereby welding wire can be side-loaded onto the frame. On the side of the frame, opposite the roller a lock ring handle is attached tangentially and is rotatable about the attachment point and an axis perpendicular to the frame. The device is grasped in the hand normally used to hold the wire. A finger is placed through the loop ring and the frame positioned across the palm and lower fingers. The thumb is positioned atop the wire so it can be moved from the back of the frame across the roller, and towards the front. In doing so, the wire is advanced at a steady rate in axial alignment with the tab openings and roller. To accommodate different wire diameters the frame is bendable about its center in the plane of the frame axis and wire so as to keep the wire in sufficient tension against the roller and to keep the wire fixed when the frame is tilted and thumb pressure released.

  10. Metering Wheel-Wire Track Wire Boom Deployment Mechanism

    NASA Technical Reports Server (NTRS)

    Granoff, Mark S.

    2014-01-01

    The NASA MMS Spin Plane Double Probe (SDP) Deployer utilizes a helical path, rotating Metering Wheel and a spring loaded Wire "Holding" Track to pay out a "fixed end" 57 meter x 1.5 mm diameter Wire Boom stored between concentric storage cylinders. Unlike rotating spool type storage devices, the storage cylinders remain stationary, and the boom wire is uncoiled along the length of the cylinder via the rotation of the Metering Wheel. This uncoiling action avoids the need for slip-ring contacts since the ends of the wire can remain stationary. Conventional fixed electrical connectors (Micro-D type) are used to terminate to operational electronics.

  11. Adaptations of the Shoulder to Overhead Throwing in Youth Athletes

    PubMed Central

    Astolfi, Matthew Michael; Struminger, Aaron H.; Royer, Todd D.; Kaminski, Thomas W.; Swanik,, Charles B.

    2015-01-01

    Context The high number of repetitions and high forces associated with overhead throwing lead to anatomical adaptations, such as humeral retrotorsion and posterior-capsule thickness, in elite and professional baseball athletes. However, little is known about the origin and progression of these changes that may account for the increasing trend of chronic shoulder injuries in youth baseball and precipitate subsequent pathologic conditions throughout a young athlete's lifetime. Objective To investigate the relationship of age and upper extremity dominance on humeral retrotorsion, posterior-capsule thickness, and glenohumeral range of motion. Design Cross-sectional study. Setting Research laboratory, local baseball fields, and training facilities. Patients or Other Participants Thirty-six boys (mean age = 10.94 ± 1.34 years, height = 151.31 ± 12.17 cm, mass = 42.51 ± 10.32 kg) ranging in age from 8 to 12 years and involved in organized youth baseball. Main Outcome Measure(s) Diagnostic ultrasound was used to determine humeral retrotorsion and posterior-capsule thickness. Glenohumeral internal rotation and external rotation were measured using a handheld inclinometer. We used 2 × 2 mixed-model analyses of variance to compare the influence of limb dominance and age on the dependent variables of humeral retrotorsion, posterior-capsule thickness, internal rotation, and external rotation. Results The dominant shoulders of youth throwers exhibited less glenohumeral internal rotation but greater humeral retrotorsion, posterior-capsule thickness, and glenohumeral external rotation than the nondominant shoulders. Dominant internal rotation was greater in the 8- to 10-year-old group than in the 11- to 12-year-old group, and results trended toward a difference (F1,33 = 4.12, P = .05). Correlations existed between humeral retrotorsion and range of motion (P < .05). Conclusions The structural adaptations in the dominant shoulders of younger baseball players were similar to

  12. Corrosion resistance of premodeled wires made of stainless steel used for heart electrotherapy leaders

    NASA Astrophysics Data System (ADS)

    Przondziono, J.; Walke, W.; Młynarski, R.; Szatka, W.

    2012-05-01

    The purpose of the study is to evaluate resistance to electrochemical corrosion of wire made of X10CrNi18-8 stainless steel designed for use in cardiology treatment. The influence of strain formed in the premodeling process and methods of wire surface preparation to corrosive resistance in artificial plasma solution were analysed. Wire corrosion tests were carried out in the solution of artificial plasma. Resistance to electrochemical corrosion was evaluated on the ground of recorded curves of anodic polarization by means of potentiodynamic method. Potentiodynamic tests carried out enabled to determine how the resistance to pitting corrosion of wire changes, depending on strain formed in the premodeling process as well as on the method of wire surface preparation. For evaluation of phenomena occurring on the surface of tested steel, electrochemical impedance spectroscopy (EIS) was applied. Deterioration of corrosive properties of wire along with the increase in the formed strain hardening was observed.

  13. The Drag of Streamline Wires

    NASA Technical Reports Server (NTRS)

    Jacobs, Eastman N

    1933-01-01

    Preliminary results are given of drag tests of streamline wires. Full-size wires were tested over a wide range of speeds in the N.A.C.A. high speed tunnel. The results are thus directly applicable to full-scale problems and include any compressibility effects encountered at the higher speeds. The results show how protuberances may be employed on conventional streamline wires to reduce the drag, and also show how the conventional wires compare with others having sections more like strut or symmetrical airfoil sections. Because the new wire sections developed are markedly superior aerodynamically to conventional wires, it is recommended that some of them be tested in service in order to investigate their relative susceptibility to vibration and to fatigue failure.

  14. Twin-Axial Wire Antenna

    DTIC Science & Technology

    2015-08-06

    08-2015 Publication Twin-Axial Wire Antenna David A. Tonn Naval Under Warfare Center Division, Newport 1176 Howell St., Code 00L, Bldg 102T...Approved for Public Release Distribution is unlimited Attorney Docket No. 300030 1 of 10 TWIN-AXIAL WIRE ANTENNA STATEMENT OF GOVERNMENT INTEREST...2 of 10 length of the antenna wire . This creates a high pass filter in the antenna and prevents current flow in the VLF/LF bands. [0005] U.S

  15. Photofabricated Wire-Grid Polarizers

    NASA Technical Reports Server (NTRS)

    Siegel, Peter H.; Dengler, Robert J.

    1992-01-01

    Freestanding metallic grids for use as polarizers for electromagnetic radiation at millimeter and submillimeter wavelengths made by simple modification of designs of freestanding square- and nearly-square cell metallic grids, according to proposal. Cross wires provide mechanical support, but distance between cross wires made greater than one wavelength so cross wires have little effect on polarizing characteristics of grid. Possible to fabricate grids commercially for frequencies up to several terahertz.

  16. Subminiature Hot-Wire Probes

    NASA Technical Reports Server (NTRS)

    Westphal, R. V.; Lemos, F. R.; Ligrani, P. M.

    1989-01-01

    Class of improved subminiature hot-wire flow-measuring probes developed. Smaller sizes yield improved resolution in measurements of practical aerodynamic flows. Probe made in one-wire, two-perpendicular-wire, and three-perpendicular-wire version for measurement of one, two, or all three components of flow. Oriented and positioned on micromanipulator stage and viewed under microscope during fabrication. Tested by taking measurements in constant-pressure turbulent boundary layer. New probes give improved measurements of turbulence quantities near surfaces and anisotropies of flows strongly influence relative errors caused by phenomena related to spatial resolution.

  17. Plasma Formation Around Single Wires

    NASA Astrophysics Data System (ADS)

    Duselis, Peter U.; Kusse, Bruce R.

    2002-12-01

    At Cornell's Laboratory of Plasma Studies, single wires of various metals were exploded using a ˜250 ns pulser with a rise time of ˜20 A/ns. It was found that the wires first experience a resistive heating phase that lasts 50-80 ns before a rapid collapse of voltage. From that point on, the voltage across the wire was negligible while the current through the wire continued to increase. We attribute this voltage collapse to the formation of plasma about the wire. Further confirmation of this explanation will be presented along with new experimental data describing preliminary spectroscopy results, the expansion rate of the plasma, and current flow along the wire as a function of radius. The resistance of the wire-electrode connection will be shown to significantly affect the energy deposition. Various diagnostics were used to obtain these experiments. Ultraviolet sensitive vacuum photodiodes and a framing camera with an 8 ns shutter were used to detect and measure the width of the visible light emitted by the plasma. A special wire holder was constructed that allowed the transfer of current from the wire to the surrounding plasma to be observed.

  18. Texture development in Galfenol wire

    NASA Astrophysics Data System (ADS)

    Boesenberg, A. J.; Restorff, J. B.; Wun-Fogle, M.; Sailsbury, H.; Summers, E.

    2013-05-01

    Galfenol (Fe-Ga alloy) wire fabrication provides a low cost alternative to directional solidification methods. This work evaluates the compositional dependence of the wire drawing suitability of Fe-Ga and characterizes the microstructural and magnetic properties of these wires. Wire has been produced with Ga contents between 10 at. % and 17 at. % to allow determination of the ductile to brittle transition (DTBT) in wire manufacture. Published results on chill cast bend specimens indicated that a DTBT occurs at roughly 15 at. % Ga. This DTBT was observed under tensile loading with a corresponding change in fracture behavior from transverse fracture to intergranular fracture. For improved magnetostrictive performance, higher Ga contents are desired, closer to the 17 at. % Ga evaluated in this work. Electron backscattered diffraction B-H loop and resonance measurements as a function of magnetic field (to determine modulus and coupling factor) are presented for as-drawn, furnace, and direct current (DC) annealed wire. Galfenol wire produced via traditional drawing methods is found to have a strong <110> (α) texture parallel to the drawing direction. As-drawn wire was observed to have a lower magnetic permeability and larger hysteresis than DC annealed wire. This is attributed to the presence of a large volume of crystalline defects; such as vacancies and dislocations.

  19. 49 CFR 234.231 - Fouling wires.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Fouling wires. 234.231 Section 234.231..., Inspection, and Testing Maintenance Standards § 234.231 Fouling wires. Each set of fouling wires in a highway... single duplex wire with single plug acting as fouling wires is prohibited. Existing installations...

  20. 49 CFR 234.231 - Fouling wires.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Fouling wires. 234.231 Section 234.231..., Inspection, and Testing Maintenance Standards § 234.231 Fouling wires. Each set of fouling wires in a highway... single duplex wire with single plug acting as fouling wires is prohibited. Existing installations...

  1. Neural wiring optimization.

    PubMed

    Cherniak, Christopher

    2012-01-01

    Combinatorial network optimization theory concerns minimization of connection costs among interconnected components in systems such as electronic circuits. As an organization principle, similar wiring minimization can be observed at various levels of nervous systems, invertebrate and vertebrate, including primate, from placement of the entire brain in the body down to the subcellular level of neuron arbor geometry. In some cases, the minimization appears either perfect, or as good as can be detected with current methods. One question such best-of-all-possible-brains results raise is, what is the map of such optimization, does it have a distinct neural domain?

  2. Plated wire memory subsystem

    NASA Technical Reports Server (NTRS)

    Carpenter, K. H.

    1974-01-01

    The design, construction, and test history of a 4096 word by 18 bit random access NDRO Plated Wire Memory for use in conjunction with a spacecraft input/output and central processing unit is reported. A technical and functional description is given along with diagrams illustrating layout and systems operation. Test data is shown on the procedures and results of system level and memory stack testing, and hybrid circuit screening. A comparison of the most significant physical and performance characteristics of the memory unit versus the specified requirements is also included.

  3. Improved superconducting magnet wire

    DOEpatents

    Schuller, I.K.; Ketterson, J.B.

    1983-08-16

    This invention is directed to a superconducting tape or wire composed of alternating layers of copper and a niobium-containing superconductor such as niobium of NbTi, Nb/sub 3/Sn or Nb/sub 3/Ge. In general, each layer of the niobium-containing superconductor has a thickness in the range of about 0.05 to 1.5 times its coherence length (which for Nb/sub 3/Si is 41 A) with each copper layer having a thickness in the range of about 170 to 600 A. With the use of very thin layers of the niobium composition having a thickness within the desired range, the critical field (H/sub c/) may be increased by factors of 2 to 4. Also, the thin layers of the superconductor permit the resulting tape or wire to exhibit suitable ductility for winding on a magnet core. These compositions are also characterized by relatively high values of critical temperature and therefore will exhibit a combination of useful properties as superconductors.

  4. Soft magnetic wires

    NASA Astrophysics Data System (ADS)

    Vázquez, M.

    2001-06-01

    An overview of the present state of the art on the preparation techniques, outstanding magnetic properties and applications of soft magnetic micro and nanowires is presented. Rapid solidification techniques (in-rotating-water quenching and drawing methods) to fabricate amorphous microwires with diameter in the range from 100 down to 1 μm are first described. Electrodeposition is also employed to prepare composite microtubes (magnetic coatings) and to fill porous membranes (diameter of the order of 0.1 μm). Magnetic behaviours of interest are related to the different hysteresis loops of samples: square-shaped loops typical of bistable behaviour, and nearly non-hysteretic loop with well-defined transverse anisotropy field. The role played by magnetic dipolar interactions in the magnetic behaviour of arrays of micro and nanowires is described. A particular analysis is done on the giant magnetoimpedance (GMI) effect in the radio and microwave frequency ranges exhibited by ultrasoft microwires. Finally, a few examples of applications are introduced for magnetostrictive and non-magnetostrictive wires, they are: “magnetoelastic pens”, micromotors; DC current-sensors based on GMI, and sharpened amorphous wire tips in spin polarised scanning tunneling microscopy.

  5. The Current in a Wire

    ERIC Educational Resources Information Center

    Thompson, Keith

    2009-01-01

    This little problem arose because I was frustrated with the standard electromagnetism texts, which show the magnetic field due to a current-bearing wire outside the wire [proportional to] 1/r and inside [proportional to] r. However, they never point out that the moving electrons must be influenced by the magnetic field created by the other moving…

  6. Wire and Packing Tape Sandwiches

    ERIC Educational Resources Information Center

    Rabinowitz, Sandy

    2009-01-01

    In this article, the author describes how students can combine craft wire with clear packing tape to create a two-dimensional design that can be bent and twisted to create a three-dimensional form. Students sandwich wire designs between two layers of tape. (Contains 1 online resource.)

  7. Aircraft wiring program status report

    NASA Technical Reports Server (NTRS)

    Beach, Rex

    1995-01-01

    In this Naval Air Warfare Center (NAWC) Aircraft Division status report, the general and wire and cable component activities, the systems engineering activities, the aircraft wiring lead maintenance activities, the NAVAIR/NASA interface activities, and the Base Realignment and Closure (BRAC) Commission recommendations are presented.

  8. Aircraft wiring program status report

    NASA Astrophysics Data System (ADS)

    Beach, Rex

    1995-11-01

    In this Naval Air Warfare Center (NAWC) Aircraft Division status report, the general and wire and cable component activities, the systems engineering activities, the aircraft wiring lead maintenance activities, the NAVAIR/NASA interface activities, and the Base Realignment and Closure (BRAC) Commission recommendations are presented.

  9. Effects of overhead work configuration on muscle activity during a simulated drilling task.

    PubMed

    Maciukiewicz, Jacquelyn M; Cudlip, Alan C; Chopp-Hurley, Jaclyn N; Dickerson, Clark R

    2016-03-01

    Overhead work is a known catalyst for occupational shoulder injury. Industrial workers must often adopt awkward overhead postures and loading profiles to complete required tasks, potentially elevating injury risk. This research examined the combined influence of multiple overhead working parameters on upper extremity muscular demands for an industrial drilling application. Twenty-two right-handed males completed 24 unilateral and bilateral overhead work exertions stratified by direction (upward, forward), point of force application (15, 30 and 45 cm in front of the body), and whole-body posture (seated, standing). The dependency of electromyographic (EMG) activity on several factors was established. Significant two-way interactions existed between point of force application and direction (p < 0.0001) and direction and whole body posture (p < 0.0001). An average increase in muscular activity of 6.5% maximal voluntary contraction (MVC) occurred for the contralateral limb when the bilateral task was completed, compared to unilateral tasks, with less than a 1% MVC increase for the active limb. These findings assist evidence-based approaches to overhead tasks, specifically in the construction industry. A bilateral task configuration is recommended to reduce glenohumeral stability demands. As well, particularly for tasks with a far reach distance, design tasks to promote a forward directed exertion. The considerable inter-subject variability suggests that fixed heights are not ideal, and should be avoided, and where this is not possible reaches should be reduced.

  10. Two-Level Incremental Checkpoint Recovery Scheme for Reducing System Total Overheads

    PubMed Central

    Li, Huixian; Pang, Liaojun; Wang, Zhangquan

    2014-01-01

    Long-running applications are often subject to failures. Once failures occur, it will lead to unacceptable system overheads. The checkpoint technology is used to reduce the losses in the event of a failure. For the two-level checkpoint recovery scheme used in the long-running tasks, it is unavoidable for the system to periodically transfer huge memory context to a remote stable storage. Therefore, the overheads of setting checkpoints and the re-computing time become a critical issue which directly impacts the system total overheads. Motivated by these concerns, this paper presents a new model by introducing i-checkpoints into the existing two-level checkpoint recovery scheme to deal with the more probable failures with the smaller cost and the faster speed. The proposed scheme is independent of the specific failure distribution type and can be applied to different failure distribution types. We respectively make analyses between the two-level incremental and two-level checkpoint recovery schemes with the Weibull distribution and exponential distribution, both of which fit with the actual failure distribution best. The comparison results show that the total overheads of setting checkpoints, the total re-computing time and the system total overheads in the two-level incremental checkpoint recovery scheme are all significantly smaller than those in the two-level checkpoint recovery scheme. At last, limitations of our study are discussed, and at the same time, open questions and possible future work are given. PMID:25111048

  11. ACUTE EFFECTS OF DIFFERENT SELF‐MASSAGE VOLUMES ON THE FMS™ OVERHEAD DEEP SQUAT PERFORMANCE

    PubMed Central

    Škarabot, Jakob; Vigotsky, Andrew D; Brown, Amanda Fernandes; Gomes, Thiago Matassoli; Novaes, Jefferson da Silva

    2017-01-01

    Background The Functional Movement Screen (FMS™) is a battery of tests designed to assess movement competency; the overhead deep squat test, specifically, has been shown to be an accurate predictor of overall FMS™ scores. Self‐massage (SM) is a ubiquitous warm‐up utilized to increase joint range of motion and, therefore, may be effective for improving performance of the overhead deep squat test. Purpose To examine how different doses (30, 60, 90, and 120 seconds) of SM of different areas of the body (plantar fascia, latissimus dorsi, and lateral thigh) affects the score obtained on an overhead deep squat test. Methods Twenty recreationally active females were recruited to be tested on four occasions: sessions one and two consisted of baseline testing, session three consisted of SM applied to the lateral thigh, and session four consisted of SM applied to the lateral torso and plantar fascia. Results In all SM conditions, at least 90 seconds was required for a change in deep squat score from baseline; therefore, it is concluded that SM the lateral torso, plantar fascia, and lateral thigh for 90 seconds or more are effective interventions for acutely improving overhead deep squat scores. Conclusion Self‐massage appears to be an effective modality for inducing acute improvements in the performance of the FMS™ overhead deep squat in all conditions tested. Level of evidence 2b PMID:28217420

  12. Contact wire zigzag value detection in the electrified railway

    NASA Astrophysics Data System (ADS)

    Gao, Xiaorong

    2001-05-01

    One of the main reasons for result the pantograph-catenary system fault in electrified railway is the contact wire zigzag value exceeding quota. In this paper, an infrared LED based photoelectric detecting system which is directly installed in the electric locomotives is presented and the method of dynamic measuring of the contact wire bias is realized. The system designed which consists of IR-LED and corresponding photo-detectors, encoder, signal transmission channel insulating from high to low voltage side, decoder and data processing device is described in details. It is shown that the zigzag value examining sensors are mounted on the head of pantograph, each neighbor unit get interval distance of 10 mm and there are 120 units altogether. The signals are output when the overhead line slipping over the slide's surface of the pantograph. The experimental results of the zigzag value obtained from the field test are reported and it has been practically proved that measuring error < 0.5%. The results are of important significance for the dynamic performance analysis as well as fault diagnosis for the pantograph- catenary system.

  13. Forming Refractory Insulation On Copper Wire

    NASA Technical Reports Server (NTRS)

    Setlock, J.; Roberts, G.

    1995-01-01

    Alternative insulating process forms flexible coat of uncured refractory insulating material on copper wire. Coated wire formed into coil or other complex shape. Wire-coating apparatus forms "green" coat on copper wire. After wire coiled, heating converts "green" coat to refractory electrical insulator. When cured to final brittle form, insulating material withstands temperatures above melting temperature of wire. Process used to make coils for motors, solenoids, and other electrical devices to be operated at high temperatures.

  14. Apollo experience report: Electrical wiring subsystem

    NASA Technical Reports Server (NTRS)

    White, L. D.

    1975-01-01

    The general requirements of the electrical wiring subsystems and the problem areas and solutions that occurred during the major part of the Apollo Program are detailed in this report. The concepts and definitions of specific requirements for electrical wiring; wire-connecting devices; and wire-harness fabrication, checkout, and installation techniques are discussed. The design and development of electrical wiring and wire-connecting devices are described. Mission performance is discussed, and conclusions and recommendations for future programs are presented.

  15. Tungsten wire for incandescent lamps

    SciTech Connect

    Walter, J.L.; Briant, C.L. )

    1990-09-01

    Tungsten wire for incandescent lamp filaments must operate at high temperatures and for long times. To meet these requirements, the grain morphology of the wire must be controlled to reduce the propensity for grain boundary sliding. The morphology is a function of the distribution of very small pockets of potassium in the wire and the mechanical processing from ingot to wire. The behavior of the filament is directly related to the grain morphology. This paper describes the mechanism by which the potassium is incorporated into and distributed in the ingot. The elongation and spheroidization of the bubbles during hot rolling and swaging is also examined and related to the grain morphology of wire. Some indications of the relationship between grain morphology and filament behavior are also given.

  16. Welding wire pressure sensor assembly

    NASA Technical Reports Server (NTRS)

    Morris, Timothy B. (Inventor); Milly, Peter F., Sr. (Inventor); White, J. Kevin (Inventor)

    1994-01-01

    The present invention relates to a device which is used to monitor the position of a filler wire relative to a base material being welded as the filler wire is added to a welding pool. The device is applicable to automated welding systems wherein nonconsumable electrode arc welding processes are utilized in conjunction with a filler wire which is added to a weld pool created by the electrode arc. The invention senses pressure deviations from a predetermined pressure between the filler wire and the base material, and provides electrical signals responsive to the deviations for actuating control mechanisms in an automatic welding apparatus so as to minimize the pressure deviation and to prevent disengagement of the contact between the filler wire and the base material.

  17. Aging life evaluation of a new carbon fiber composite core wire

    NASA Astrophysics Data System (ADS)

    Cao, Jiangming; Wang, Zhihua; Zhang, Yongbo; Fu, Huimin

    2017-01-01

    The carbon fiber composite core wire is the key component for new overhead transmission lines in the power industry. As the primary load-bearing member, the composite mandrel will produce long-term creep because of the tensile during operation. Therefore, designers need to understand the long-term deformation behaviour of the composite mandrel to assess its durability. To this end, an accelerated creep test on the composite core rod under different temperatures and stresses has been conducted in the current study. According to the time- temperature- stress superposition principle, the shift factors are calculated, and the creep under normal working condition is predicted. Results show that the carbon fiber composite core wire can satisfy the design requirements under normal working condition.

  18. 29 CFR 1910.901-1910.999 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Guards .180(j)(2) Clearances .180(j)(1) Notifying Owners .180(j)(3) Overhead Wires .180(j)(4) Derrick...) Overhead Wires .181(j)(5)(iv) Safety-related work practices .333(c)(3) Electric Powered Trucks .178(b)(4... .305(b) Fixture Wires .305(i) Flexible Cords and Cables .305(g) General requirements .303 Grounded...

  19. CCD Photometry of bright stars using objective wire mesh

    SciTech Connect

    Kamiński, Krzysztof; Zgórz, Marika; Schwarzenberg-Czerny, Aleksander

    2014-06-01

    Obtaining accurate photometry of bright stars from the ground remains problematic due to the danger of overexposing the target and/or the lack of suitable nearby comparison stars. The century-old method of using objective wire mesh to produce multiple stellar images seems promising for the precise CCD photometry of such stars. Furthermore, our tests on β Cep and its comparison star, differing by 5 mag, are very encouraging. Using a CCD camera and a 20 cm telescope with the objective covered by a plastic wire mesh, in poor weather conditions, we obtained differential photometry with a precision of 4.5 mmag per two minute exposure. Our technique is flexible and may be tuned to cover a range as big as 6-8 mag. We discuss the possibility of installing a wire mesh directly in the filter wheel.

  20. Wire Electrical Discharge Truing of Metal Bond Diamond Grinding Wheels

    SciTech Connect

    McSpadden, SB

    2002-01-24

    Cylindrical wire EDM profile truing of the metal bond diamond wheel for precision form grinding of ceramics is presented in this report. First a corrosion-resistant, precise spindle with the high-electrical current capability for wire EDM truing of grinding wheel was fabricated. An arc profile was adopted in order to determine form tolerances capabilities of this process. Results show the wire EDM process can generate {micro}m-scale precision form on the diamond wheel efficiently. The wheel, after truing, was used to grind silicon nitride. Grinding forces, surface finish of ground components, and wheel wear were measured. The EDM trued wheel showed a reduction in grinding force from that of the stick dressed wheel. Surface finishes between the two truing methods were similar. In the beginning of the grinding, significant wheel wear rate was identified. The subsequent wheel wear rate stabilized and became considerably lower.

  1. Sintered wire cathode

    DOEpatents

    Falce, Louis R.; Ives, R. Lawrence

    2009-06-09

    A porous cathode structure is fabricated from a plurality of wires which are placed in proximity to each other in elevated temperature and pressure for a sintering time. The sintering process produces the porous cathode structure which may be divided into a plurality of individual porous cathodes, one of which may be placed into a dispenser cathode support which includes a cavity for containing a work function reduction material such as BaO, CaO, and Al.sub.2O.sub.3. The work function reduction material migrates through the pores of the porous cathode from a work replenishment surface adjacent to the cavity of the dispenser cathode support to an emitting cathode surface, thereby providing a dispenser cathode which has a uniform work function and therefore a uniform electron emission.

  2. 7 CFR 1755.406 - Shield or armor ground resistance measurements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... plant and fiber optic cable plant. (b) Method of measurement. (1) The shield or armor ground resistance measurement shall be made between the copper cable and wire shield and ground and between the fiber optic... instructions. (d) Applicable results. (1) For all new copper cable and wire facilities and all new fiber...

  3. 7 CFR 1755.406 - Shield or armor ground resistance measurements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... plant and fiber optic cable plant. (b) Method of measurement. (1) The shield or armor ground resistance measurement shall be made between the copper cable and wire shield and ground and between the fiber optic... instructions. (d) Applicable results. (1) For all new copper cable and wire facilities and all new fiber...

  4. 7 CFR 1755.406 - Shield or armor ground resistance measurements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... plant and fiber optic cable plant. (b) Method of measurement. (1) The shield or armor ground resistance measurement shall be made between the copper cable and wire shield and ground and between the fiber optic... instructions. (d) Applicable results. (1) For all new copper cable and wire facilities and all new fiber...

  5. Communication overhead on the Intel Paragon, IBM SP2 and Meiko CS-2

    NASA Technical Reports Server (NTRS)

    Bokhari, Shahid H.

    1995-01-01

    Interprocessor communication overhead is a crucial measure of the power of parallel computing systems-its impact can severely limit the performance of parallel programs. This report presents measurements of communication overhead on three contemporary commercial multicomputer systems: the Intel Paragon, the IBM SP2 and the Meiko CS-2. In each case the time to communicate between processors is presented as a function of message length. The time for global synchronization and memory access is discussed. The performance of these machines in emulating hypercubes and executing random pairwise exchanges is also investigated. It is shown that the interprocessor communication time depends heavily on the specific communication pattern required. These observations contradict the commonly held belief that communication overhead on contemporary machines is independent of the placement of tasks on processors. The information presented in this report permits the evaluation of the efficiency of parallel algorithm implementations against standard baselines.

  6. 29 CFR 1910.305 - Wiring methods, components, and equipment for general use.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... or visible markings on the equipment or structure. (iii) Dry-type, high fire point liquid-insulated..., cable armor, cable sheath, enclosures, frames, fittings, and other metal noncurrent-carrying parts that... grounding conductor installed to ground the equipment enclosure. (iii) No wiring systems of any type may...

  7. 29 CFR 1910.305 - Wiring methods, components, and equipment for general use.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... or visible markings on the equipment or structure. (iii) Dry-type, high fire point liquid-insulated..., cable armor, cable sheath, enclosures, frames, fittings, and other metal noncurrent-carrying parts that... grounding conductor installed to ground the equipment enclosure. (iii) No wiring systems of any type may...

  8. 29 CFR 1910.305 - Wiring methods, components, and equipment for general use.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... or visible markings on the equipment or structure. (iii) Dry-type, high fire point liquid-insulated..., cable armor, cable sheath, enclosures, frames, fittings, and other metal noncurrent-carrying parts that... grounding conductor installed to ground the equipment enclosure. (iii) No wiring systems of any type may...

  9. 29 CFR 1910.305 - Wiring methods, components, and equipment for general use.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... or visible markings on the equipment or structure. (iii) Dry-type, high fire point liquid-insulated..., cable armor, cable sheath, enclosures, frames, fittings, and other metal noncurrent-carrying parts that... grounding conductor installed to ground the equipment enclosure. (iii) No wiring systems of any type may...

  10. Nitrate leaching beneath a containerized nursery crop receiving trickle or overhead irrigation.

    PubMed

    Colangelo, D J; Brand, M H

    2001-01-01

    Container production of nursery crops is intensive and a potential source of nitrogen release to the environment. This study was conducted to determine if trickle irrigation could be used by container nursery producers as an alternative to standard overhead irrigation to reduce nitrogen release into the environment. The effect of overhead irrigation and trickle irrigation on leachate nitrate N concentration, flow-weighted nitrate N concentration, leachate volume, and plant growth was investigated using containerized rhododendron (Rhododendron catawbiense Michx. 'Album') supplied with a controlled-release fertilizer and grown outdoors on top of soil-monolith lysimeters. Leachate was collected over two growing seasons and overwinter periods, and natural precipitation was allowed as a component of the system. Precipitation accounted for 69% of the water entering the overhead-irrigated system and 80% of the water entering the trickle-irrigated system. Leachate from fertilized plants exceeded the USEPA limit of 10 mg L(-1) at several times and reached a maximum of 26 mg L(-1) with trickle irrigation. Average annual loss of nitrate N in leachate for fertilized treatments was 51.8 and 60.5 kg ha(-1) for the overhead and trickle treatments, respectively. Average annual flow-weighted concentration of nitrate N in leachate of fertilized plants was 7.2 mg L(-1) for overhead irrigation and 12.7 mg L(-1) for trickle irrigation. Trickle irrigation did not reduce the amount of nitrate N leached from nursery containers when compared with overhead irrigation because precipitation nullified the potential benefits of reduced leaching fractions and irrigation inputs provided under trickle irrigation.

  11. Plasma chemistry in wire chambers

    SciTech Connect

    Wise, J.

    1990-05-01

    The phenomenology of wire chamber aging is discussed and fundamentals of proportional counters are presented. Free-radical polymerization and plasma polymerization are discussed. The chemistry of wire aging is reviewed. Similarities between wire chamber plasma (>1 atm dc-discharge) and low-pressure rf-discharge plasmas, which have been more widely studied, are suggested. Construction and use of a system to allow study of the plasma reactions occurring in wire chambers is reported. A proportional tube irradiated by an {sup 55}Fe source is used as a model wire chamber. Condensable species in the proportional tube effluent are concentrated in a cryotrap and analyzed by gas chromatography/mass spectrometry. Several different wire chamber gases (methane, argon/methane, ethane, argon/ethane, propane, argon/isobutane) are tested and their reaction products qualitatively identified. For all gases tested except those containing methane, use of hygroscopic filters to remove trace water and oxygen contaminants from the gas resulted in an increase in the average molecular weight of the products, consistent with results from low-pressure rf-discharge plasmas. It is suggested that because water and oxygen inhibit polymer growth in the gas phase that they may also reduce polymer deposition in proportional tubes and therefore retard wire aging processes. Mechanistic implications of the plasma reactions of hydrocarbons with oxygen are suggested. Unresolved issues in this work and proposals for further study are discussed.

  12. Operational environments for electrical power wiring on NASA space systems

    NASA Technical Reports Server (NTRS)

    Stavnes, Mark W.; Hammoud, Ahmad N.; Bercaw, Robert W.

    1994-01-01

    Electrical wiring systems are used extensively on NASA space systems for power management and distribution, control and command, and data transmission. The reliability of these systems when exposed to the harsh environments of space is very critical to mission success and crew safety. Failures have been reported both on the ground and in flight due to arc tracking in the wiring harnesses, made possible by insulation degradation. This report was written as part of a NASA Office of Safety and Mission Assurance (Code Q) program to identify and characterize wiring systems in terms of their potential use in aerospace vehicles. The goal of the program is to provide the information and guidance needed to develop and qualify reliable, safe, lightweight wiring systems, which are resistant to arc tracking and suitable for use in space power applications. This report identifies the environments in which NASA spacecraft will operate, and determines the specific NASA testing requirements. A summary of related test programs is also given in this report. This data will be valuable to spacecraft designers in determining the best wiring constructions for the various NASA applications.

  13. Operational environments for electrical power wiring on NASA space systems

    NASA Astrophysics Data System (ADS)

    Stavnes, Mark W.; Hammoud, Ahmad N.; Bercaw, Robert W.

    1994-06-01

    Electrical wiring systems are used extensively on NASA space systems for power management and distribution, control and command, and data transmission. The reliability of these systems when exposed to the harsh environments of space is very critical to mission success and crew safety. Failures have been reported both on the ground and in flight due to arc tracking in the wiring harnesses, made possible by insulation degradation. This report was written as part of a NASA Office of Safety and Mission Assurance (Code Q) program to identify and characterize wiring systems in terms of their potential use in aerospace vehicles. The goal of the program is to provide the information and guidance needed to develop and qualify reliable, safe, lightweight wiring systems, which are resistant to arc tracking and suitable for use in space power applications. This report identifies the environments in which NASA spacecraft will operate, and determines the specific NASA testing requirements. A summary of related test programs is also given in this report. This data will be valuable to spacecraft designers in determining the best wiring constructions for the various NASA applications.

  14. Transient current pulses in rocket-extended wires used to trigger lightning

    NASA Astrophysics Data System (ADS)

    Biagi, C. J.; Uman, M. A.; Hill, J. D.; Rakov, V. A.; Jordan, D. M.

    2012-04-01

    We analyze current, electric field, and optical signatures of the sudden electrical breakdown processes (precursors) that occur at the top of the upward extending, grounded, Kevlar-covered copper wires used to artificially trigger lightning. For one launch, before the sustained upward positive leader initiated, we estimate that up to 10,000 precursors occurred (one every few hundred microseconds) with peak currents from 1 to more than 100 A. Luminosity at the wire tip was observed for 339 of 410 precursors examined in detail and, in seven cases, discharge channels developed to lengths of 3 to 8 m over times of several hundred microseconds. The measured propagation speeds of current pulses on the triggering wires were less than the speed of light, and decreased from about 2.8 × 108 m s-1 to about 2.3 × 108 m s-1with increasing wire-top heights from about 80 m to about 340 m. The triggering wire and its grounding system are modeled as uniform transmission lines with model predictions that are consistent with the measured wire-base precursor current signatures. The modeling shows that (1) the characteristic impedance of the triggering wire, the ratio of the propagating precursor voltage pulse to its associated current pulse, is between 600 and 800 Ω; (2) the 25 m ground rod grounding impedance for the peak precursor current is about 100 Ω, while the DC grounding resistance is 20 Ω; and (3) the current reflection coefficient at ground for peak precursor current is ˜0.9.

  15. Influence of Flaws of Wire Rod Surface, Inclusions and Voids on Wire Breaks in Superfine Wire Drawing

    NASA Astrophysics Data System (ADS)

    Yoshida, Kazunari; Norasethasopon, Somchai; Shinohara, Tetsuo; Ido, Ryuta

    By means of the finite element analysis (FEA), this study analyzed wire breaks that occurred in the drawing fine wires containing flaws on the wire surface, inclusion and void. The deformation behavior of an inclusion was examined, in which the inclusion's location is assumed to be on the center axis of the wire, and the cause of wire breaks and their prevention method were clarified. It was found that an inclusion diameter/wire diameter ratio of 0.4 or higher increases the likelihood of wire breaks occurring. When the inclusion is not assumed to be in the center axis of the wire, it was also found that necking and wire breaks appear more frequently. FEA showed that a flaw grows with each processing step, when a small circumferential flaw is placed on the wire rod surface, and eventually becomes a surface defect, which is called a check mark in practice.

  16. Disorder-induced bound states within an adatom-quantum wire system

    NASA Astrophysics Data System (ADS)

    Magnetta, Bradley; Ordonez, Gonzalo

    2014-03-01

    Bound states induced by disorder are theoretically observed within a quantum wire and adatom system. The quantum wire is modeled as an array of quantum wells with random energies and exhibits Anderson Localization. By varying the energy of our adatom and adjusting the tunneling strength between the adatom and the quantum wire we observe disorder-induced bound states between the the adatom and its attached point. The characteristics of these disorder-induced bound states are greatly influenced by the site of interest on the quantum wire. Utilizing random quantum wires and disordered superlattices to produce bound states may offer flexibility in fabrication as well as provide grounds for energy transmission in photovoltaics.

  17. 29 CFR 1919.79 - Wire rope.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 7 2011-07-01 2011-07-01 false Wire rope. 1919.79 Section 1919.79 Labor Regulations...) GEAR CERTIFICATION Certification of Shore-Based Material Handling Devices § 1919.79 Wire rope. (a) Wire rope and replacement wire rope shall be of the same size, same or better grade, and same...

  18. 29 CFR 1919.79 - Wire rope.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 7 2014-07-01 2014-07-01 false Wire rope. 1919.79 Section 1919.79 Labor Regulations...) GEAR CERTIFICATION Certification of Shore-Based Material Handling Devices § 1919.79 Wire rope. (a) Wire rope and replacement wire rope shall be of the same size, same or better grade, and same...

  19. 29 CFR 1919.79 - Wire rope.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 7 2013-07-01 2013-07-01 false Wire rope. 1919.79 Section 1919.79 Labor Regulations...) GEAR CERTIFICATION Certification of Shore-Based Material Handling Devices § 1919.79 Wire rope. (a) Wire rope and replacement wire rope shall be of the same size, same or better grade, and same...

  20. 29 CFR 1919.79 - Wire rope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 7 2010-07-01 2010-07-01 false Wire rope. 1919.79 Section 1919.79 Labor Regulations...) GEAR CERTIFICATION Certification of Shore-Based Material Handling Devices § 1919.79 Wire rope. (a) Wire rope and replacement wire rope shall be of the same size, same or better grade, and same...

  1. 29 CFR 1919.79 - Wire rope.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 7 2012-07-01 2012-07-01 false Wire rope. 1919.79 Section 1919.79 Labor Regulations...) GEAR CERTIFICATION Certification of Shore-Based Material Handling Devices § 1919.79 Wire rope. (a) Wire rope and replacement wire rope shall be of the same size, same or better grade, and same...

  2. 49 CFR 234.231 - Fouling wires.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Fouling wires. 234.231 Section 234.231... wires. Each set of fouling wires in a highway-rail grade crossing train detection circuit shall consist... detection circuit is shunted. Installation of a single duplex wire with single plug acting as fouling...

  3. 49 CFR 234.231 - Fouling wires.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Fouling wires. 234.231 Section 234.231... wires. Each set of fouling wires in a highway-rail grade crossing train detection circuit shall consist... detection circuit is shunted. Installation of a single duplex wire with single plug acting as fouling...

  4. 49 CFR 234.231 - Fouling wires.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Fouling wires. 234.231 Section 234.231... wires. Each set of fouling wires in a highway-rail grade crossing train detection circuit shall consist... detection circuit is shunted. Installation of a single duplex wire with single plug acting as fouling...

  5. Spring control of wire harness loops

    NASA Technical Reports Server (NTRS)

    Curcio, P. J.

    1979-01-01

    Negator spring control guides wire harness between movable and fixed structure. It prevents electrical wire harness loop from jamming or being severed as wire moves in response to changes in position of aircraft rudder. Spring-loaded coiled cable controls wire loop regardless of rudder movement.

  6. Wire Jewelry/Black History.

    ERIC Educational Resources Information Center

    Daniel, Robert A.; Robinson, Charles C.

    1984-01-01

    Described is a project which made the study of Black history more real to fifth graders by having them make wire jewelry, smaller versions of the ornate filigreed ironwork produced by slave blacksmiths. (RM)

  7. 46 CFR 183.340 - Cable and wiring requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... hazardous location. (m) A cable may be spliced in a location, other than a hazardous location, under the...(55) 18.3(60) 12-volts, 2 wire—10 percent drop wire sizes (A.W.G.) 5 14 14 14 14 14 14 14 14 12 12 12... sub-circuits grounded at the supply end only. (r) A portable or temporary electric cord or cable...

  8. 46 CFR 183.340 - Cable and wiring requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... hazardous location. (m) A cable may be spliced in a location, other than a hazardous location, under the...(55) 18.3(60) 12-volts, 2 wire—10 percent drop wire sizes (A.W.G.) 5 14 14 14 14 14 14 14 14 12 12 12... sub-circuits grounded at the supply end only. (r) A portable or temporary electric cord or cable...

  9. 46 CFR 183.340 - Cable and wiring requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... hazardous location. (m) A cable may be spliced in a location, other than a hazardous location, under the...(55) 18.3(60) 12-volts, 2 wire—10 percent drop wire sizes (A.W.G.) 5 14 14 14 14 14 14 14 14 12 12 12... sub-circuits grounded at the supply end only. (r) A portable or temporary electric cord or cable...

  10. 46 CFR 183.340 - Cable and wiring requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... hazardous location. (m) A cable may be spliced in a location, other than a hazardous location, under the...(55) 18.3(60) 12-volts, 2 wire—10 percent drop wire sizes (A.W.G.) 5 14 14 14 14 14 14 14 14 12 12 12... sub-circuits grounded at the supply end only. (r) A portable or temporary electric cord or cable...

  11. Modeling birds on wires.

    PubMed

    Aydoğdu, A; Frasca, P; D'Apice, C; Manzo, R; Thornton, J M; Gachomo, B; Wilson, T; Cheung, B; Tariq, U; Saidel, W; Piccoli, B

    2017-02-21

    In this paper we introduce a mathematical model to study the group dynamics of birds resting on wires. The model is agent-based and postulates attraction-repulsion forces between the interacting birds: the interactions are "topological", in the sense that they involve a given number of neighbors irrespective of their distance. The model is first mathematically analyzed and then simulated to study its main properties: we observe that the model predicts birds to be more widely spaced near the borders of each group. We compare the results from the model with experimental data, derived from the analysis of pictures of pigeons and starlings taken in New Jersey: two different image elaboration protocols allow us to establish a good agreement with the model and to quantify its main parameters. We also discuss the potential handedness of the birds, by analyzing the group organization features and the group dynamics at the arrival of new birds. Finally, we propose a more refined mathematical model that describes landing and departing birds by suitable stochastic processes.

  12. 49 CFR 234.241 - Protection of insulated wire; splice in underground wire.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Protection of insulated wire; splice in underground wire. 234.241 Section 234.241 Transportation Other Regulations Relating to Transportation... of insulated wire; splice in underground wire. Insulated wire shall be protected from...

  13. 49 CFR 234.241 - Protection of insulated wire; splice in underground wire.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Protection of insulated wire; splice in underground wire. 234.241 Section 234.241 Transportation Other Regulations Relating to Transportation... of insulated wire; splice in underground wire. Insulated wire shall be protected from...

  14. Smart Wire Grid: Resisting Expectations

    SciTech Connect

    Ramsay, Stewart; Lowe, DeJim

    2014-03-03

    Smart Wire Grid's DSR technology (Discrete Series Reactor) can be quickly deployed on electrical transmission lines to create intelligent mesh networks capable of quickly rerouting electricity to get power where and when it's needed the most. With their recent ARPA-E funding, Smart Wire Grid has been able to move from prototype and field testing to building out a US manufacturing operation in just under a year.

  15. Method of manufacturing superconductor wire

    SciTech Connect

    Motowidlo, Leszek

    2014-09-16

    A method for forming Nb.sub.3Sn superconducting wire is provided. The method employs a powder-in-tube process using a high-tin intermetallic compound, such as MnSn.sub.2, for producing the Nb.sub.3Sn. The use of a high-tin intermetallic compound enables the process to perform hot extrusion without melting the high-tin intermetallic compound. Alternatively, the method may entail drawing the wire without hot extrusion.

  16. Smart Wire Grid: Resisting Expectations

    ScienceCinema

    Ramsay, Stewart; Lowe, DeJim

    2016-07-12

    Smart Wire Grid's DSR technology (Discrete Series Reactor) can be quickly deployed on electrical transmission lines to create intelligent mesh networks capable of quickly rerouting electricity to get power where and when it's needed the most. With their recent ARPA-E funding, Smart Wire Grid has been able to move from prototype and field testing to building out a US manufacturing operation in just under a year.

  17. 49 CFR 214.515 - Overhead covers for existing on-track roadway maintenance machines.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... maintenance machines. 214.515 Section 214.515 Transportation Other Regulations Relating to Transportation... Roadway Maintenance Machines and Hi-Rail Vehicles § 214.515 Overhead covers for existing on-track roadway maintenance machines. (a) For those existing on-track roadway maintenance machines either currently...

  18. 49 CFR 214.515 - Overhead covers for existing on-track roadway maintenance machines.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... maintenance machines. 214.515 Section 214.515 Transportation Other Regulations Relating to Transportation... Roadway Maintenance Machines and Hi-Rail Vehicles § 214.515 Overhead covers for existing on-track roadway maintenance machines. (a) For those existing on-track roadway maintenance machines either currently...

  19. 49 CFR 214.515 - Overhead covers for existing on-track roadway maintenance machines.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... maintenance machines. 214.515 Section 214.515 Transportation Other Regulations Relating to Transportation... Roadway Maintenance Machines and Hi-Rail Vehicles § 214.515 Overhead covers for existing on-track roadway maintenance machines. (a) For those existing on-track roadway maintenance machines either currently...

  20. 49 CFR 214.515 - Overhead covers for existing on-track roadway maintenance machines.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... maintenance machines. 214.515 Section 214.515 Transportation Other Regulations Relating to Transportation... Roadway Maintenance Machines and Hi-Rail Vehicles § 214.515 Overhead covers for existing on-track roadway maintenance machines. (a) For those existing on-track roadway maintenance machines either currently...

  1. 49 CFR 214.515 - Overhead covers for existing on-track roadway maintenance machines.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... maintenance machines. 214.515 Section 214.515 Transportation Other Regulations Relating to Transportation... Roadway Maintenance Machines and Hi-Rail Vehicles § 214.515 Overhead covers for existing on-track roadway maintenance machines. (a) For those existing on-track roadway maintenance machines either currently...

  2. Redesigning the rural health center: high tech, high touch, and low overhead.

    PubMed

    Crane, Steven

    2011-01-01

    To attract new physicians to rural primary care, new models of care are needed that are more effective, more sustainable, and replicable in smaller communities. This commentary provides a brief description of preliminary findings associated with a radically redesigned, low-overhead patient-centered medical-home practice model in North Carolina.

  3. Using the Overhead Projector as a Light Source for Physics Demonstrations

    ERIC Educational Resources Information Center

    Mak, Se-Yuen

    2006-01-01

    This article illustrates how the overhead projector can be used as a light source in some peculiar ways for physics demonstrations. Five examples are included: (1) Study of chromatic aberration; (2) Making giant Newton's rings; (3) Comparison of the rate of heat absorption by different surfaces; (4) Demonstration of greenhouse effect; and (5)…

  4. Marangoni Flowers and the Evil Eye: Overhead Presentations of Marangoni Flow

    ERIC Educational Resources Information Center

    Mundell, Donald W.

    2009-01-01

    Intermolecular forces and surface tension gradients in solutions lead to remarkable flows, known as Marangoni flows, where liquid flows from a region of low surface tension towards higher surface tension. Details of these flows, not visible to the naked eye, are made visible on an overhead projector owing to variation in the index of refraction.…

  5. Demonstrating Heat Changes on the Overhead Projector with a Projecting Thermometer.

    ERIC Educational Resources Information Center

    Hur, Chinhyu; Solomon, Sally; Wetzel, Christy

    1998-01-01

    Heat changes in a lecture setting can be safely shown on an overhead projector using a simple and inexpensive apparatus. Heat evolution can be observed on a projector with adapted digital thermometers or by illuminating the red fluid in nonmercury thermometers. Describes a setup for doing this as well as a collection of demonstrations involving…

  6. A Dynamic Duo: LCD Overhead Displays and Laptops as Instructional Aids in Introductory Psychology.

    ERIC Educational Resources Information Center

    Ransdell, Sarah

    1989-01-01

    Describes simulation software that was used with an LCD overhead display and laptop computers for large introductory psychology courses. The use of experiment simulators to increase student interest and activity is discussed, hardware is explained, and interaction between students, instructor, and the simulation is described. (14 references) (LRW)

  7. 45. DETAIL OF OVERHEAD SERVICE CRANE (5TON CRANE MANUFACTURED BY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. DETAIL OF OVERHEAD SERVICE CRANE (5-TON CRANE MANUFACTURED BY ARMINGTON CARRIAGE; 3-TON HOIST MANUFACTURED BY WRIGHT HOIST COMPANY) IN VALVEHOUSE FOR NEEDLE VALVE OUTLET WORKS ON GALLERY 2. VIEW TO EAST. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  8. Demonstrating Biological Principles Efficiently and Effectively: The Overhead Is More than Just a Lighted Chalkboard

    ERIC Educational Resources Information Center

    Barden-Gabbei, Laura M.

    2006-01-01

    The overhead projector is an excellent tool for teachers at both the high school and college level. Teachers often use it to display class notes as they monitor students' actions and reactions to the concepts being presented and discussed, to display diagrams and figures too complex to draw on the chalkboard, and more recently to display computer…

  9. Four limb amputations due to electrical burn caused by TV antenna contact with overhead electric cables.

    PubMed

    Celiköz, B; Sengezer, M; Selmanpakoğlu, N

    1997-02-01

    A 22-year-old man who sustained four limb amputations due to an electrical burn caused by contact of a TV receiver antenna with overhead electric cables is presented. The indications for limb amputation and the necessary preventive measures for such injuries are discussed.

  10. 48 CFR 3452.216-71 - Negotiated overhead rates-fixed.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Negotiated overhead rates-fixed. 3452.216-71 Section 3452.216-71 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Texts of Provisions...

  11. Apparatus for positioning modular components on a vertical or overhead surface

    NASA Technical Reports Server (NTRS)

    Haynig, C. C.; Messineo, S. V. (Inventor)

    1976-01-01

    An apparatus is disclosed for holding a plurality of modular components against a surface. A fixture prepositions the components and a vacuum develops a uniform pressure which presses and holds the fixture and objects against a surface. The surface may be curved, vertical, or overhead and since local load concentrations are avoided, fragile ceramic tiles may be installed using the apparatus.

  12. 76 FR 10476 - Special Conditions: Boeing Model 787-8 Airplane; Overhead Crew-Rest Compartment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-25

    ... Crew- Rest Compartment AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final special... will have novel or unusual design features associated with installation of an overhead crew-rest (OCR... Sec. 21.101. Novel or Unusual Design Features Crew-rest compartments have been installed...

  13. 1 mil gold bond wire study.

    SciTech Connect

    Huff, Johnathon; McLean, Michael B.; Jenkins, Mark W.; Rutherford, Brian Milne

    2013-05-01

    In microcircuit fabrication, the diameter and length of a bond wire have been shown to both affect the current versus fusing time ratio of a bond wire as well as the gap length of the fused wire. This study investigated the impact of current level on the time-to-open and gap length of 1 mil by 60 mil gold bond wires. During the experiments, constant current was provided for a control set of bond wires for 250ms, 410ms and until the wire fused; non-destructively pull-tested wires for 250ms; and notched wires. The key findings were that as the current increases, the gap length increases and 73% of the bond wires will fuse at 1.8A, and 100% of the wires fuse at 1.9A within 60ms. Due to the limited scope of experiments and limited data analyzed, further investigation is encouraged to confirm these observations.

  14. Improved Method of Locating Defects in Wiring Insulation

    NASA Technical Reports Server (NTRS)

    Greulich, Owen R.

    2004-01-01

    An improved method of locating small breaches in insulation on electrical wires combines aspects of the prior dielectric withstand voltage (DWV) and time-domain reflectometry (TDR) methods. The method was invented to satisfy a need for reliably and quickly locating insulation defects in spacecraft, aircraft, ships, and other complex systems that contain large amounts of wiring, much of it enclosed in structures that make it difficult to inspect. In the DWV method, one applies a predetermined potential (usually 1.5 kV DC) to the wiring and notes whether the voltage causes any arcing between the wiring and ground. The DWV method does not provide an indication of the location of the defect (unless, in an exceptional case, the arc happens to be visible). In addition, if there is no electrically conductive component at ground potential within about 0.010 in. (approximately equal to 0.254 mm) of the wire at the location of an insulation defect, then the DWV method does not provide an indication of the defect. Moreover, one does not have the option to raise the potential in an effort to increase the detectability of such a defect because doing so can harm previously undamaged insulation. In the TDR method as practiced heretofore, one applies a pulse of electricity having an amplitude of less than 25 V to a wire and measures the round-trip travel time for the reflection of the pulse from a defect. The distance along the wire from the point of application of the pulse to the defect is then calculated as the product of half the round-trip travel time and the characteristic speed of a propagation of an electromagnetic signal in the wire. While the TDR method as practiced heretofore can be used to locate a short or open circuit, it does not ordinarily enable one to locate a small breach in insulation because the pulse voltage is too low to cause arcing and thus too low to induce an impedance discontinuity large enough to generate a measurable reflection. The present improved

  15. 29 CFR 1926.1003 - Overhead protection for operators of agricultural and industrial tractors used in construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... REGULATIONS FOR CONSTRUCTION Rollover Protective Structures; Overhead Protection § 1926.1003 Overhead... of a solid material. When grid or mesh is used, the largest permissible opening shall be such that the maximum circle that can be inscribed between the elements of the grid or mesh is 1.5 in. (38...

  16. 77 FR 53914 - Horton Automatics, Inc., a Subsidiary of Overhead Door Corporation Including On-Site Leased...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-04

    ... Employment and Training Administration Horton Automatics, Inc., a Subsidiary of Overhead Door Corporation... Automatics, Inc., a subsidiary of Overhead Door Corporation, including on-site leased workers from Remedy... of automatic sliding, swinging, and revolving doors. The notice was published in the Federal...

  17. HTS Wire Development Workshop: Proceedings

    SciTech Connect

    Not Available

    1994-07-01

    The 1994 High-Temperature Superconducting Wire Development Workshop was held on February 16--17 at the St. Petersburg Hilton and Towers in St. Petersburg, Florida. The meeting was hosted by Florida Power Corporation and sponsored by the US Department of Energy`s Superconductivity Program for Electric Power Systems. The meeting focused on recent high-temperature superconducting wire development activities in the Department of Energy`s Superconductivity Systems program. The meeting opened with a general discussion on the needs and benefits of superconductivity from a utility perspective, the US global competitiveness position, and an outlook on the overall prospects of wire development. The meeting then focused on four important technology areas: Wire characterization: issues and needs; technology for overcoming barriers: weak links and flux pinning; manufacturing issues for long wire lengths; and physical properties of HTS coils. Following in-depth presentations, working groups were formed in each technology area to discuss the most important current research and development issues. The working groups identified research areas that have the potential for greatly enhancing the wire development effort. These areas are discussed in the summary reports from each of the working groups. This document is a compilation of the workshop proceedings including all general session presentations and summary reports from the working groups.

  18. Laser soldering of enameled wires

    NASA Astrophysics Data System (ADS)

    Böhm, S.; Hemken, G.; Noack, K.

    2009-02-01

    In electrical connections with enameled copper wires, isolation material residue can be found in the solder area when the coating is not stripped. This residue can lead to mechanical and electrical problems. In electronic devices and MEMS, quality requirements increase with rising thermal requirements for electrical contacts made from enameled copper wire. Examples for this exist in the area of automotive electronics, consumer electronics and in the field of machine design. Typical products with electrical connecting which use enameled wires include: micro-phones and speakers (especially for mobile phones), coil forms, small transformers, relays, clock coils, and so on. Due to increasing thermal and electrical requirements, the manufacturer of enameled wires continuously develops new isolating materials for the improvement of isolation classes, thermal resistance, etc. When using current bonding and solder processes, there exist problems for contacting enameled copper wire with these insulation layers. Therefore the Institute of Joining and Welding, Department Micro Joining developed a laser based solder process with which enamels copper wires can enable high quality electrical connections without a preceding stripping process.

  19. Connecting to Thermocouples with Fewer Lead Wires

    NASA Technical Reports Server (NTRS)

    Goldsby, Jon C.

    2003-01-01

    A simple technique has been devised to reduce the number of lead wires needed to connect an array of thermocouples to the instruments (e.g., voltmeters) used to read their output voltages. Because thermocouple wires are usually made of expensive metal alloys, reducing the number of lead wires can effect a considerable reduction in the cost of such an array. Reducing the number of wires also reduces the number of terminals and the amount of space needed to accommodate the wires.

  20. Fabrication of Pd-Cr wire

    NASA Technical Reports Server (NTRS)

    Diamond, Sidney; Leach, Dennen M.

    1989-01-01

    Fabrication of Pd-13 percent Cr alloy wires is described. Melting, casting, swaging and annealing processes are discussed. Drawing to reach two diameters (0.003 inch and 0.00176 inch) of wire is described. Representative micrographs of the Pd-Cr alloy at selected stages during wire fabrication are included. The resistance of the wire was somewhat lower, by about 15 to 20 percent, than comparable wire of other alloys used for strain gages.

  1. Lightning and surge protection of large ground facilities

    NASA Astrophysics Data System (ADS)

    Stringfellow, Michael F.

    1988-04-01

    The vulnerability of large ground facilities to direct lightning strikes and to lightning-induced overvoltages on the power distribution, telephone and data communication lines are discussed. Advanced electrogeometric modeling is used for the calculation of direct strikes to overhead power lines, buildings, vehicles and objects within the facility. Possible modes of damage, injury and loss are discussed. Some appropriate protection methods for overhead power lines, structures, vehicles and aircraft are suggested. Methods to mitigate the effects of transients on overhead and underground power systems as well as within buildings and other structures are recommended. The specification and location of low-voltage surge suppressors for the protection of vulnerable hardware such as computers, telecommunication equipment and radar installations are considered. The advantages and disadvantages of commonly used grounding techniques, such as single point, multiple and isolated grounds are compared. An example is given of the expected distribution of lightning flashes to a large airport, its buildings, structures and facilities, as well as to vehicles on the ground.

  2. Deployment/retraction ground testing of a large flexible solar array

    NASA Technical Reports Server (NTRS)

    Chung, D. T.

    1982-01-01

    The simulated zero-gravity ground testing of the flexible fold-up solar array consisting of eighty-four full-size panels (.368 m x .4 m each) is addressed. Automatic, hands-off extension, retraction, and lockup operations are included. Three methods of ground testing were investigated: (1) vertical testing; (2) horizontal testing, using an overhead water trough to support the panels; and (3) horizontal testing, using an overhead track in conjunction with a counterweight system to support the panels. Method 3 was selected as baseline. The wing/assembly vertical support structure, the five-tier overhead track, and the mast-element support track comprise the test structure. The flexible solar array wing assembly was successfully extended and retracted numerous times under simulated zero-gravity conditions.

  3. Plasma arc torch with coaxial wire feed

    DOEpatents

    Hooper, Frederick M

    2002-01-01

    A plasma arc welding apparatus having a coaxial wire feed. The apparatus includes a plasma arc welding torch, a wire guide disposed coaxially inside of the plasma arc welding torch, and a hollow non-consumable electrode. The coaxial wire guide feeds non-electrified filler wire through the tip of the hollow non-consumable electrode during plasma arc welding. Non-electrified filler wires as small as 0.010 inches can be used. This invention allows precision control of the positioning and feeding of the filler wire during plasma arc welding. Since the non-electrified filler wire is fed coaxially through the center of the plasma arc torch's electrode and nozzle, the wire is automatically aimed at the optimum point in the weld zone. Therefore, there is no need for additional equipment to position and feed the filler wire from the side before or during welding.

  4. Californium Recovery from Palladium Wire

    SciTech Connect

    Burns, Jon D.

    2014-08-01

    The recovery of 252Cf from palladium-252Cf cermet wires was investigated to determine the feasibility of implementing it into the cermet wire production operation at Oak Ridge National Laboratory’s Radiochemical Engineering Development Center. The dissolution of Pd wire in 8 M HNO3 and trace amounts of HCl was studied at both ambient and elevated temperatures. These studies showed that it took days to dissolve the wire at ambient temperature and only 2 hours at 60°C. Adjusting the ratio of the volume of solvent to the mass of the wire segment showed little change in the kinetics of dissolution, which ranged from 0.176 mL/mg down to 0.019 mL/mg. A successful chromatographic separation of 153Gd, a surrogate for 252Cf, from Pd was demonstrated using AG 50x8 cation exchange resin with a bed volume of 0.5 mL and an internal diameter of 0.8 cm.

  5. Grounded theory.

    PubMed

    Harris, Tina

    2015-04-29

    Grounded theory is a popular research approach in health care and the social sciences. This article provides a description of grounded theory methodology and its key components, using examples from published studies to demonstrate practical application. It aims to demystify grounded theory for novice nurse researchers, by explaining what it is, when to use it, why they would want to use it and how to use it. It should enable nurse researchers to decide if grounded theory is an appropriate approach for their research, and to determine the quality of any grounded theory research they read.

  6. Quantitative assessment of tension in wires of fine-wire external fixators.

    PubMed

    Dong, Yin; Saleh, Micheal; Yang, Lang

    2005-01-01

    Fine-wire fixators are widely used in fracture management. Stable fixation requires the wires maintaining tension throughout the treatment. Clinical experience indicates that wire site complications relate to wire tension. However, there lacks a method to assess wire tension quantitatively in the clinic. The objective of this study was to develop a quantitative assessment method for in situ wire tension and to investigate the factors that influence the assessment. An apparatus was developed based on a linear variable differential transformer (LVDT) displacement transducer that measured the deflection of the testing wire with respect to a parallel reference wire when a constant transverse force of 30N was applied to the testing wire. The wire deflection measured was correlated with the wire tension measured by the force transducer. The experiment was performed under different conditions to assess the effect of bone-clamp distance, reference wire tension, number of wires, and fracture stiffness. The results showed that there was a significant and negative correlation between wire tension and deflection and the bone-clamp distance was the most important factor that affected the wire tension-deflection relationship. The assessment method makes it possible to investigate the relationship between wire tension and wire site complications in the clinic.

  7. Twist knot cerclage wire: the appropriate wire tension for knot construction and fracture stability.

    PubMed

    Harnroongroj, Thossart

    1998-09-01

    OBJECTIVE: The aim was to find the best wire tension in order to permit a reliable first twist and simultaneously provide the best stability of fracture fixation from the twist knot cerclage wire. DESIGN: Wires at different distal tensions, looped around the fracture, were measured during twist and compared with the yield strength of the wire. Then, the fracture stability of the twist knot cerclage wire was determined from the pull-out strength. METHODS: In order to measure wire tension during twist knot construction, an instrument was designed using the tension load cell of a universal testing machine, a 15 degrees oblique osteotomy femoral shaft and 1.25 mm diameter wire. A wire tensioner and a pair of extraction grips were then used for measuring the pull-out strength of the cerclage wire fixation. RESULT: Three wire tensions (160, 200 and 240 N) were used as looped wire for the first twist knot construction. The 200 N tension cerclage wire provided the best fracture stability. CONCLUSION: It was found that 200 N was the best wire tension for the construction of a twist knot cerclage wire. RELEVANCE: When a cerclage wire is twisted at a femoral shaft using 1.25 mm diameter wire, a wire tension of 200 N should be used to achieve a reliable first twist and the best stability of fracture fixation.

  8. A low overhead load balancing router for network-on-chip

    NASA Astrophysics Data System (ADS)

    Xiaofeng, Zhou; Lu, Liu; Zhangming, Zhu; Duan, Zhou

    2016-11-01

    The design of a router in a network-on-chip (NoC) system has an important impact on some performance criteria. In this paper, we propose a low overhead load balancing router (LOLBR) for 2D mesh NoC to enhance routing performance criteria with low hardware overhead. The proposed LOLBR employs a balance toggle identifier to control the initial routing direction of X or Y for flit injection. The simplified demultiplexers and multiplexers are used to handle output ports allocation and contention, which provide a guarantee of deadlock avoidance. Simulation results show that the proposed LOLBR yields an improvement of routing performance over the reported routing schemes in average packet latency by 26.5%. The layout area and power consumption of the network compared with the reported routing schemes are 15.3% and 11.6% less respectively. Project supported by the National Natural Science Foundation of China (Nos. 61474087, 61322405, 61376039).

  9. 3-D Object Recognition Using Combined Overhead And Robot Eye-In-Hand Vision System

    NASA Astrophysics Data System (ADS)

    Luc, Ren C.; Lin, Min-Hsiung

    1987-10-01

    A new approach for recognizing 3-D objects using a combined overhead and eye-in-hand vision system is presented. A novel eye-in-hand vision system using a fiber-optic image array is described. The significance of this approach is the fast and accurate recognition of 3-D object information compared to traditional stereo image processing. For the recognition of 3-D objects, the over-head vision system will take 2-D top view image and the eye-in-hand vision system will take side view images orthogonal to the top view image plane. We have developed and demonstrated a unique approach to integrate this 2-D information into a 3-D representation based on a new approach called "3-D Volumetric Descrip-tion from 2-D Orthogonal Projections". The Unimate PUMA 560 and TRAPIX 5500 real-time image processor have been used to test the success of the entire system.

  10. A Hybrid Method for Evaluating of Lightning Performance of Overhead Lines based on Monte Carlo Procedure

    NASA Astrophysics Data System (ADS)

    Shariatinasab, Reza; Tadayon, Pooya; Ametani, Akihiro

    2016-07-01

    This paper proposes a hybrid method for calculating lightning performance of overhead lines caused by direct strokes by combining Lattice diagram together with the Monte Carlo method. In order to go through this, firstly, the proper analytical relations for overvoltages calculation are established based on Lattice diagram. Then, the Monte Carlo procedure is applied to the obtained analytical relations. The aim of the presented method that will be called `ML method' is simply estimation of the lightning performance of the overhead lines and performing the risk analysis of power apparatus with retaining the acceptable accuracy. To confirm the accuracy, the calculated results of the presented ML method are compared with those calculated by the EMTP/ATP simulation.

  11. A fuzzy-logic antiswing controller for three-dimensional overhead cranes.

    PubMed

    Cho, Sung-Kun; Lee, Ho-Hoon

    2002-04-01

    In this paper, a new fuzzy antiswing control scheme is proposed for a three-dimensional overhead crane. The proposed control consists of a position servo control and a fuzzy-logic control. The position servo control is used to control crane position and rope length, and the fuzzy-logic control is used to suppress load swing. The proposed control guarantees not only prompt suppression of load swing but also accurate control of crane position and rope length for simultaneous travel, traverse, and hoisting motions of the crane. Furthermore, the proposed control provides practical gain tuning criteria for easy application. The effectiveness of the proposed control is shown by experiments with a three-dimensional prototype overhead crane.

  12. Plasma spraying with wire feedstock

    SciTech Connect

    Scholl, M.

    1994-12-31

    Plasma spraying has been limited to using powder feedstocks for a number of reasons. One limitation has been the low energy output of conventional plasma guns. The advent of high energy plasma spraying (HEPS) devices and the associated technology has effectively removed this functional limitation. With HEPS, the combination of high gas velocities and high thermal plasma temperatures coupled with a large exit gas volume enables wire and rod feedstocks to be effectively utilized. Rather than a bulk melting mechanism, a model based on ablation phenomena is considered. The paper examines an analysis of melting phenomena and presents a simple model for molten droplet formation for plasma spraying using wire feedstocks.

  13. Wire Detection Algorithms for Navigation

    NASA Technical Reports Server (NTRS)

    Kasturi, Rangachar; Camps, Octavia I.

    2002-01-01

    In this research we addressed the problem of obstacle detection for low altitude rotorcraft flight. In particular, the problem of detecting thin wires in the presence of image clutter and noise was studied. Wires present a serious hazard to rotorcrafts. Since they are very thin, their detection early enough so that the pilot has enough time to take evasive action is difficult, as their images can be less than one or two pixels wide. Two approaches were explored for this purpose. The first approach involved a technique for sub-pixel edge detection and subsequent post processing, in order to reduce the false alarms. After reviewing the line detection literature, an algorithm for sub-pixel edge detection proposed by Steger was identified as having good potential to solve the considered task. The algorithm was tested using a set of images synthetically generated by combining real outdoor images with computer generated wire images. The performance of the algorithm was evaluated both, at the pixel and the wire levels. It was observed that the algorithm performs well, provided that the wires are not too thin (or distant) and that some post processing is performed to remove false alarms due to clutter. The second approach involved the use of an example-based learning scheme namely, Support Vector Machines. The purpose of this approach was to explore the feasibility of an example-based learning based approach for the task of detecting wires from their images. Support Vector Machines (SVMs) have emerged as a promising pattern classification tool and have been used in various applications. It was found that this approach is not suitable for very thin wires and of course, not suitable at all for sub-pixel thick wires. High dimensionality of the data as such does not present a major problem for SVMs. However it is desirable to have a large number of training examples especially for high dimensional data. The main difficulty in using SVMs (or any other example-based learning

  14. Designing potentials by sculpturing wires

    SciTech Connect

    Della Pietra, Leonardo; Aigner, Simon; Groth, Soenke; Hagen, Christoph von; Schmiedmayer, Joerg; Bar-Joseph, Israel; Lezec, Henri J.

    2007-06-15

    Magnetic trapping potentials for atoms on atom chips are determined by the current flow in the chip wires. By modifying the shape of the conductor we can realize specialized current flow patterns and therefore microdesign the trapping potentials. We have demonstrated this by nano-machining an atom chip using the focused ion beam technique. We built a trap, a barrier, and using a Bose-Einstein Condensate as a probe we showed that by polishing the conductor edge the potential roughness on the selected wire can be reduced. Furthermore, we give different other designs and discuss the creation of a one-dimensional magnetic lattice on an atom chip.

  15. GAMMA FACILITY, TRA611, INTERIOR. WITH HELP OF OVERHEAD CHAIN AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    GAMMA FACILITY, TRA-611, INTERIOR. WITH HELP OF OVERHEAD CHAIN AND HOOK, SCIENTIST GUIDES METAL CONTAINER (HOLDING POTATOES, IN THIS CASE) INTO RECEIVING "COLUMN" IN THE GAMMA CANAL. NOTE OTHER COLUMNS AT RIGHT AND LEFT WALLS OF CANAL. NEAR BOTTOM OF CANAL, SPENT MTR FUEL WILL IRRADIATE POTATOES. INL NEGATIVE NO. 56-439. R.G. Larsen, Photographer, 2/8/1956 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  16. Characterization Results for the March 2016 H-Tank Farm 2H Evaporator Overhead Samples

    SciTech Connect

    Nicholson, J. C.

    2016-05-09

    This report contains the radioanalytical results of the 2H evaporator overhead sample received at SRNL on March 16, 2016. Specifically, concentrations of 137Cs, 90Sr, and 129I are reported and compared to the corresponding Waste Acceptance Criteria (WAC) limits of the Effluent Treatment Project (ETP) Waste Water Collection Tank (WWCT) (rev. 6). All of the radionuclide concentrations in the sample were found to be in compliance with the ETP WAC limits.

  17. Estimation of the maximal voltage induced on an overhead line due to the nearby lightning

    SciTech Connect

    Jankov, V.

    1997-01-01

    Determination of the maximal voltages induced on the overhead power lines by nearby lightning stroke is a complex problem. The scope of this paper is to recognize the parameters that affect the maximal voltages and to present an equation for their estimation. This equation gives an opportunity to calculate the maximal voltage with the reasonable accuracy avoiding complex electromagnetic field calculus. It may be very useful in the estimation of flashover and outage rates due to the nearby strokes.

  18. Characterization Results For The 2013 HTF 3H Evaporator Overhead Samples

    SciTech Connect

    Washington, A. L. II

    2013-12-04

    This report tabulates the radiochemical analysis of the 3H evaporator overhead sample for {sup 137}Cs, {sup 90}Sr, and {sup 129}I to meet the requirements in the Effluent Treatment Project (ETP) Waste Acceptance Criteria (WAC) (rev. 6). This report identifies the sample receipt date, preparation method, and analysis performed in the accumulation of the listed values. All data was found to be within the ETP WAC (rev. 6) specification for the Waste Water Collection Tanks (WWCT).

  19. The effects of overhead transparency design on retention, recall, and application of data analysis content.

    PubMed

    Van Hoozer, H; Brink, P J; Oppliger, R

    1989-04-01

    This experimental study tested the effects of overhead transparency design in conjunction with live lecture on retention, recall, and application of data analysis content over three occasions using a Solomon Four-Group, pretest-posttest design. Pretested subjects showed significant (p less than .001) gains in test scores from pre to posttest. No significant differences were found in pretest scores between control and experimental treatment groups or among the posttest scores of either the experimental or control groups.

  20. Characterization results for the October 2015-Tank for farm 3H evaporator overhead examples

    SciTech Connect

    Nicholson, J. C.

    2016-01-28

    This report contains the radioanalytical results of the 3H evaporator overhead sample received at SRNL on October 13, 2015. Specifically, concentrations of 137Cs, 90Sr, and 129I are reported and compared to the corresponding Waste Acceptance Criteria (WAC) limits of the Effluent Treatment Project (ETP) Waste Water Collection Tank (WWCT) (rev. 6). All of the radionuclide concentrations in the sample were found to be in compliance with the ETP WAC limits.