Science.gov

Sample records for overhead ground wires

  1. Obstacle negotiation control for a mobile robot suspended on overhead ground wires by optoelectronic sensors

    NASA Astrophysics Data System (ADS)

    Zheng, Li; Yi, Ruan

    2009-11-01

    Power line inspection and maintenance already benefit from developments in mobile robotics. This paper presents mobile robots capable of crossing obstacles on overhead ground wires. A teleoperated robot realizes inspection and maintenance tasks on power transmission line equipment. The inspection robot is driven by 11 motor with two arms, two wheels and two claws. The inspection robot is designed to realize the function of observation, grasp, walk, rolling, turn, rise, and decline. This paper is oriented toward 100% reliable obstacle detection and identification, and sensor fusion to increase the autonomy level. An embedded computer based on PC/104 bus is chosen as the core of control system. Visible light camera and thermal infrared Camera are both installed in a programmable pan-and-tilt camera (PPTC) unit. High-quality visual feedback rapidly becomes crucial for human-in-the-loop control and effective teleoperation. The communication system between the robot and the ground station is based on Mesh wireless networks by 700 MHz bands. An expert system programmed with Visual C++ is developed to implement the automatic control. Optoelectronic laser sensors and laser range scanner were installed in robot for obstacle-navigation control to grasp the overhead ground wires. A novel prototype with careful considerations on mobility was designed to inspect the 500KV power transmission lines. Results of experiments demonstrate that the robot can be applied to execute the navigation and inspection tasks.

  2. Effect of Overhead Ground Wire Installing under Distribution Lines on Surge Arrester Failures

    NASA Astrophysics Data System (ADS)

    Sugimoto, Hitoshi

    Distribution surge arresters are often damaged by lightning strokes, in particular, winter lightning. An overhead ground wire (OGW) is one of effective measures against surge arrester failures. However, adding the conventional OGW to existing overhead power distribution lines needs the power interruption for construction as well as high costs because of installing them above phase conductors. Experimental results show that a covered conductor for distribution lines is more difficult to attract lightning than a bare conductor. Moreover, lightning strokes to distribution pole heads occupied over 90% of all lightning strokes in the observation result of lightning strokes to actual distribution lines without the conventional OGW, and lightning strokes to power lines were hardly observed. These results indicate that the pole heads shield the power lines from direct lightning strokes. Therefore the author studies the application of an OGW under the distribution lines (UGW) for reducing surge arrester failures. The lightning performance of the UGW is estimated by the Electro-Magnetic Transients Program (EMTP) and its effectiveness is demonstrated. The measure is expected to cut costs of construction and maintenance for lightning protection.

  3. 2. TYPICAL OVERHEAD WIRE CONSTRUCTION CURVE GUY WIRE ARRANGEMENT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. TYPICAL OVERHEAD WIRE CONSTRUCTION - CURVE GUY WIRE ARRANGEMENT (ABANDONED WEST LEG OF WYE AT SIXTH AVENUE AND PINE STREET) - Yakima Valley Transportation Company Interurban Railroad, Trackage, Yakima, Yakima County, WA

  4. Application of vision measurements for modal analysis of wires for the purpose of overhead transmission lines monitoring

    NASA Astrophysics Data System (ADS)

    Mendrok, Krzysztof; Dworakowski, Ziemowit; Holak, Krzysztof; Kohut, Piotr

    2017-05-01

    Overhead transmission power lines are still one of the crucial elements of electro-energetic system. There are obvious advantages of using overhead transmission in the distribution of electricity. The amount of energy transported through a power line is determined by the distance between the wire and the ground or other objects placed beneath it (eg. trees). This distance is not fixed and depends on the overhang of the wire. This, in turn, is determined by many factors such as ambient temperature, humidity, precipitation, the value of current flowing through the wire. In order to optimize the wires electrical load, the monitoring of that overhang is required. One way to measure it is the non-contact measurement by vision system. It has the advantage, that using high-speed cameras respectively it also allows for vibration measurement and analysis of dynamic performance. That is very important while the wires are susceptible to the influence of wind, and the resulting vibrations interfere with the correct measurement of the overhang. The paper presents the results of vision measurements of the system vibrations and modal analysis carried out on their basis. The study was conducted on a specially made laboratory stand.

  5. 30 CFR 75.906 - Trailing cables for mobile equipment, ground wires, and ground check wires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Trailing cables for mobile equipment, ground wires, and ground check wires. 75.906 Section 75.906 Mineral Resources MINE SAFETY AND HEALTH..., ground wires, and ground check wires. Trailing cables for mobile equipment shall contain one or more...

  6. 30 CFR 75.906 - Trailing cables for mobile equipment, ground wires, and ground check wires.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Trailing cables for mobile equipment, ground wires, and ground check wires. 75.906 Section 75.906 Mineral Resources MINE SAFETY AND HEALTH..., ground wires, and ground check wires. Trailing cables for mobile equipment shall contain one or more...

  7. 30 CFR 75.906 - Trailing cables for mobile equipment, ground wires, and ground check wires.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Trailing cables for mobile equipment, ground wires, and ground check wires. 75.906 Section 75.906 Mineral Resources MINE SAFETY AND HEALTH..., ground wires, and ground check wires. Trailing cables for mobile equipment shall contain one or more...

  8. Dynamic Stiffness of a Railway Overhead Wire System and its Effect on Pantograph-Catenary System Dynamics

    NASA Astrophysics Data System (ADS)

    Wu, T. X.; Brennan, M. J.

    1999-01-01

    For an electrical railway overhead wire system there are two main factors which crucially affect the quality of current collection. One is the spatial stiffness variation of the overhead wire along each span and the other is the flexural wave motion in the wire. In this paper a periodically excited single-degree-of-freedom (SDOF) model of a combined pantograph-catenary system is introduced and its basic dynamic behaviour is discussed. To investigate the effect of wave propagation in the overhead wire on vibration of the pantograph the dynamic stiffness of the catenary is introduced into the model. The dynamic stiffness of the catenary is determined by representing the overhead wire system as an infinite periodically spring-supported string. The results show that the dynamic stiffness of the catenary varies with train speed and its effect on the performance of the pantograph-catenary system is discussed.

  9. Dynamic Stiffness of a Railway Overhead Wire System and its Effect on PANTOGRAPH-CATENARY System Dynamics

    NASA Astrophysics Data System (ADS)

    Wu, T. X.; Brennan, M. J.

    1999-01-01

    For an electrical railway overhead wire system there are two main factors which crucially affect the quality of current collection. One is the spatial stiffness variation of the overhead wire along each span and the other is the flexural wave motion in the wire. In this paper a periodically excited single-degree-of-freedom (SDOF) model of a combined pantograph-catenary system is introduced and its basic dynamic behaviour is discussed. To investigate the effect of wave propagation in the overhead wire on vibration of the pantograph the dynamic stiffness of the catenary is introduced into the model. The dynamic stiffness of the catenary is determined by representing the overhead wire system as an infinite periodically spring-supported string. The results show that the dynamic stiffness of the catenary varies with train speed and its effect on the performance of the pantograph-catenary system is discussed.

  10. 30 CFR 75.701-4 - Grounding wires; capacity of wires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Grounding wires; capacity of wires. 75.701-4... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Grounding § 75.701-4 Grounding wires; capacity of wires. Where grounding wires are used to ground metallic sheaths, armors, conduits, frames...

  11. 30 CFR 75.701-4 - Grounding wires; capacity of wires.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Grounding wires; capacity of wires. 75.701-4... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Grounding § 75.701-4 Grounding wires; capacity of wires. Where grounding wires are used to ground metallic sheaths, armors, conduits,...

  12. 30 CFR 75.701-4 - Grounding wires; capacity of wires.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Grounding wires; capacity of wires. 75.701-4... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Grounding § 75.701-4 Grounding wires; capacity of wires. Where grounding wires are used to ground metallic sheaths, armors, conduits,...

  13. 30 CFR 75.701-4 - Grounding wires; capacity of wires.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Grounding wires; capacity of wires. 75.701-4... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Grounding § 75.701-4 Grounding wires; capacity of wires. Where grounding wires are used to ground metallic sheaths, armors, conduits,...

  14. 30 CFR 77.701-3 - Grounding wires; capacity.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Grounding wires; capacity. 77.701-3 Section 77... MINES Grounding § 77.701-3 Grounding wires; capacity. Where grounding wires are used to ground metallic sheaths, armors, conduits, frames, casings, and other metallic enclosures, such grounding wires will be...

  15. 30 CFR 77.701-3 - Grounding wires; capacity.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Grounding wires; capacity. 77.701-3 Section 77... MINES Grounding § 77.701-3 Grounding wires; capacity. Where grounding wires are used to ground metallic sheaths, armors, conduits, frames, casings, and other metallic enclosures, such grounding wires will...

  16. 30 CFR 77.701-3 - Grounding wires; capacity.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Grounding wires; capacity. 77.701-3 Section 77... MINES Grounding § 77.701-3 Grounding wires; capacity. Where grounding wires are used to ground metallic sheaths, armors, conduits, frames, casings, and other metallic enclosures, such grounding wires will...

  17. 30 CFR 77.701-3 - Grounding wires; capacity.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Grounding wires; capacity. 77.701-3 Section 77... MINES Grounding § 77.701-3 Grounding wires; capacity. Where grounding wires are used to ground metallic sheaths, armors, conduits, frames, casings, and other metallic enclosures, such grounding wires will...

  18. 30 CFR 75.906 - Trailing cables for mobile equipment, ground wires, and ground check wires.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Trailing cables for mobile equipment, ground... Underground Low- and Medium-Voltage Alternating Current Circuits § 75.906 Trailing cables for mobile equipment, ground wires, and ground check wires. Trailing cables for mobile equipment shall contain one or more...

  19. 30 CFR 75.906 - Trailing cables for mobile equipment, ground wires, and ground check wires.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Trailing cables for mobile equipment, ground... Underground Low- and Medium-Voltage Alternating Current Circuits § 75.906 Trailing cables for mobile equipment, ground wires, and ground check wires. Trailing cables for mobile equipment shall contain one or more...

  20. 30 CFR 77.701-3 - Grounding wires; capacity.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Grounding wires; capacity. 77.701-3 Section 77.701-3 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY... MINES Grounding § 77.701-3 Grounding wires; capacity. Where grounding wires are used to ground metallic...

  1. 30 CFR 75.701-4 - Grounding wires; capacity of wires.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Grounding wires; capacity of wires. 75.701-4 Section 75.701-4 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE...; capacity of wires. Where grounding wires are used to ground metallic sheaths, armors, conduits, frames...

  2. Do wire fences stop ground fires?

    Treesearch

    James L. Murphy; Harry E. Schimke

    1965-01-01

    Five meshes (1/8 to 1 inch) of 16-gauge steel wire fences, 3 feet high, were tested as possible ground fire barriers in 4 fuel types. The 1/8-inch mesh stopped only 1 test fire but retarded others; 1/4-inch mesh retarded some. The results suggest that further trials may be worthwhile.

  3. Determining damping characteristics of railway-overhead-wire system for finite-element analysis

    NASA Astrophysics Data System (ADS)

    Zou, Dong; Zhang, Wei Hua; Li, Rui Ping; Zhou, Ning; Mei, Gui Ming

    2016-07-01

    In order to investigate the damping characteristics of railway-overhead-wire systems, we propose herein an approach based on the continuous wavelet transform (CWT) and two existing formulas concerning Rayleigh damping coefficients (RDCs). In the proposed process, the displacement histories of a real catenary are first obtained by using a set of noncontact photogrammetric devices, following which an exclusive catenary damping ratio related to the first dominant modal component in the catenary response is identified through a complex Morlet CWT. Thereafter, iterative finite-element analysis is conducted to find the optimal RDCs, which involves using two related formulas and the similarity between the catenary displacements obtained by simulation and experimentation. The results of our study demonstrate that this combined approach is constructive, especially for structures with closely spaced modes, such as catenaries. For the case studied herein, the catenary modal damping ratio at 1.19 Hz is approximately 1%, and the mass and stiffness proportional Rayleigh damping coefficients are approximately 0.02845 and 0.00274, respectively.

  4. 30 CFR 77.705 - Guy wires; grounding.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Guy wires; grounding. 77.705 Section 77.705 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH... § 77.705 Guy wires; grounding. Guy wires from poles supporting high-voltage transmission lines shall be...

  5. 30 CFR 77.705 - Guy wires; grounding.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Guy wires; grounding. 77.705 Section 77.705 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH... § 77.705 Guy wires; grounding. Guy wires from poles supporting high-voltage transmission lines shall be...

  6. 30 CFR 77.705 - Guy wires; grounding.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Guy wires; grounding. 77.705 Section 77.705 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH... § 77.705 Guy wires; grounding. Guy wires from poles supporting high-voltage transmission lines shall...

  7. 30 CFR 77.705 - Guy wires; grounding.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Guy wires; grounding. 77.705 Section 77.705 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH... § 77.705 Guy wires; grounding. Guy wires from poles supporting high-voltage transmission lines shall...

  8. 30 CFR 77.705 - Guy wires; grounding.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Guy wires; grounding. 77.705 Section 77.705 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH... § 77.705 Guy wires; grounding. Guy wires from poles supporting high-voltage transmission lines shall...

  9. 30 CFR 77.906 - Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... mobile equipment; ground wires and ground check wires. 77.906 Section 77.906 Mineral Resources MINE... Alternating Current Circuits § 77.906 Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check wires. On and after September 30, 1971, all trailing cables supplying power to...

  10. 30 CFR 77.906 - Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... mobile equipment; ground wires and ground check wires. 77.906 Section 77.906 Mineral Resources MINE... Alternating Current Circuits § 77.906 Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check wires. On and after September 30, 1971, all trailing cables supplying power to...

  11. Detail of wire ground screen in relation to towers, looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Detail of wire ground screen in relation to towers, looking southeast - Over-the-Horizon Backscatter Radar Network, Tulelake Radar Site Receive Sector Five Antenna Array, Unnamed Road West of Double Head Road, Tulelake, Siskiyou County, CA

  12. 30 CFR 77.906 - Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check wires. 77.906 Section 77.906 Mineral Resources MINE... wires and ground check wires. On and after September 30, 1971, all trailing cables supplying power to...

  13. 30 CFR 77.704-11 - Use of grounded messenger wires; ungrounded systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Use of grounded messenger wires; ungrounded... AREAS OF UNDERGROUND COAL MINES Grounding § 77.704-11 Use of grounded messenger wires; ungrounded systems. Solely for purposes of grounding ungrounded high-voltage power systems, grounded messenger wires...

  14. 30 CFR 75.705-11 - Use of grounded messenger wires; ungrounded systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Use of grounded messenger wires; ungrounded....705-11 Use of grounded messenger wires; ungrounded systems. Solely for purposes of grounding ungrounded high-voltage power systems, grounded messenger wires used to suspend the cables of such systems...

  15. 30 CFR 75.705-11 - Use of grounded messenger wires; ungrounded systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Use of grounded messenger wires; ungrounded....705-11 Use of grounded messenger wires; ungrounded systems. Solely for purposes of grounding ungrounded high-voltage power systems, grounded messenger wires used to suspend the cables of such...

  16. 30 CFR 75.705-11 - Use of grounded messenger wires; ungrounded systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Use of grounded messenger wires; ungrounded....705-11 Use of grounded messenger wires; ungrounded systems. Solely for purposes of grounding ungrounded high-voltage power systems, grounded messenger wires used to suspend the cables of such...

  17. 30 CFR 75.705-11 - Use of grounded messenger wires; ungrounded systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Use of grounded messenger wires; ungrounded....705-11 Use of grounded messenger wires; ungrounded systems. Solely for purposes of grounding ungrounded high-voltage power systems, grounded messenger wires used to suspend the cables of such...

  18. 30 CFR 75.705-11 - Use of grounded messenger wires; ungrounded systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Use of grounded messenger wires; ungrounded....705-11 Use of grounded messenger wires; ungrounded systems. Solely for purposes of grounding ungrounded high-voltage power systems, grounded messenger wires used to suspend the cables of such...

  19. 30 CFR 77.902-3 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 77.902-3 Section 77.902-3 Mineral...-Voltage Alternating Current Circuits § 77.902-3 Attachment of ground conductors and ground check wires to...

  20. 30 CFR 75.902-4 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 75.902-4 Section 75.902-4 Mineral... § 75.902-4 Attachment of ground conductors and ground check wires to equipment frames; use of separate...

  1. 30 CFR 75.902-4 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 75.902-4 Section 75.902-4 Mineral... § 75.902-4 Attachment of ground conductors and ground check wires to equipment frames; use of separate...

  2. 30 CFR 75.902-4 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 75.902-4 Section 75.902-4 Mineral... § 75.902-4 Attachment of ground conductors and ground check wires to equipment frames; use of separate...

  3. 30 CFR 77.902-3 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 77.902-3 Section 77.902-3 Mineral...-Voltage Alternating Current Circuits § 77.902-3 Attachment of ground conductors and ground check wires to...

  4. 30 CFR 75.902-4 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 75.902-4 Section 75.902-4 Mineral... § 75.902-4 Attachment of ground conductors and ground check wires to equipment frames; use of separate...

  5. 30 CFR 75.902-4 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 75.902-4 Section 75.902-4 Mineral... § 75.902-4 Attachment of ground conductors and ground check wires to equipment frames; use of separate...

  6. 30 CFR 77.902-3 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 77.902-3 Section 77.902-3 Mineral...-Voltage Alternating Current Circuits § 77.902-3 Attachment of ground conductors and ground check wires to...

  7. 30 CFR 77.902-3 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 77.902-3 Section 77.902-3 Mineral...-Voltage Alternating Current Circuits § 77.902-3 Attachment of ground conductors and ground check wires to...

  8. 30 CFR 77.902-3 - Attachment of ground conductors and ground check wires to equipment frames; use of separate...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Attachment of ground conductors and ground check wires to equipment frames; use of separate connections. 77.902-3 Section 77.902-3 Mineral...-Voltage Alternating Current Circuits § 77.902-3 Attachment of ground conductors and ground check wires...

  9. 30 CFR 77.906 - Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... mobile equipment; ground wires and ground check wires. 77.906 Section 77.906 Mineral Resources MINE... Alternating Current Circuits § 77.906 Trailing cables supplying power to low-voltage mobile equipment; ground... portable or mobile equipment from low-voltage three-phase resistance grounded power systems shall contain...

  10. 30 CFR 77.906 - Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... mobile equipment; ground wires and ground check wires. 77.906 Section 77.906 Mineral Resources MINE... Alternating Current Circuits § 77.906 Trailing cables supplying power to low-voltage mobile equipment; ground... portable or mobile equipment from low-voltage three-phase resistance grounded power systems shall contain...

  11. 30 CFR 77.704-11 - Use of grounded messenger wires; ungrounded systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Use of grounded messenger wires; ungrounded... AREAS OF UNDERGROUND COAL MINES Grounding § 77.704-11 Use of grounded messenger wires; ungrounded systems. Solely for purposes of grounding ungrounded high-voltage power systems, grounded messenger...

  12. 30 CFR 77.704-11 - Use of grounded messenger wires; ungrounded systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Use of grounded messenger wires; ungrounded... AREAS OF UNDERGROUND COAL MINES Grounding § 77.704-11 Use of grounded messenger wires; ungrounded systems. Solely for purposes of grounding ungrounded high-voltage power systems, grounded messenger...

  13. 30 CFR 77.704-11 - Use of grounded messenger wires; ungrounded systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Use of grounded messenger wires; ungrounded... AREAS OF UNDERGROUND COAL MINES Grounding § 77.704-11 Use of grounded messenger wires; ungrounded systems. Solely for purposes of grounding ungrounded high-voltage power systems, grounded messenger...

  14. 30 CFR 77.704-11 - Use of grounded messenger wires; ungrounded systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Use of grounded messenger wires; ungrounded... AREAS OF UNDERGROUND COAL MINES Grounding § 77.704-11 Use of grounded messenger wires; ungrounded systems. Solely for purposes of grounding ungrounded high-voltage power systems, grounded messenger...

  15. 30 CFR 77.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... pilot check wires. 77.902-2 Section 77.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... Approved ground check systems not employing pilot check wires. Ground check systems not employing pilot check wires shall be approved by the Secretary only after it has been determined that the...

  16. 30 CFR 77.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... pilot check wires. 77.902-2 Section 77.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... Approved ground check systems not employing pilot check wires. Ground check systems not employing pilot check wires shall be approved by the Secretary only after it has been determined that the...

  17. 30 CFR 75.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Approved ground check systems not employing pilot check wires. 75.902-2 Section 75.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... employing pilot check wires. Ground check systems not employing pilot check wires will be approved only...

  18. 30 CFR 75.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Approved ground check systems not employing pilot check wires. 75.902-2 Section 75.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... employing pilot check wires. Ground check systems not employing pilot check wires will be approved only...

  19. 30 CFR 75.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Approved ground check systems not employing pilot check wires. 75.902-2 Section 75.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... employing pilot check wires. Ground check systems not employing pilot check wires will be approved only...

  20. 30 CFR 77.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... pilot check wires. 77.902-2 Section 77.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... Approved ground check systems not employing pilot check wires. Ground check systems not employing pilot check wires shall be approved by the Secretary only after it has been determined that the...

  1. 30 CFR 75.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Approved ground check systems not employing pilot check wires. 75.902-2 Section 75.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... employing pilot check wires. Ground check systems not employing pilot check wires will be approved only...

  2. 30 CFR 75.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Approved ground check systems not employing pilot check wires. 75.902-2 Section 75.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... employing pilot check wires. Ground check systems not employing pilot check wires will be approved only...

  3. 30 CFR 77.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... pilot check wires. 77.902-2 Section 77.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... Approved ground check systems not employing pilot check wires. Ground check systems not employing pilot check wires shall be approved by the Secretary only after it has been determined that the...

  4. 30 CFR 77.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... pilot check wires. 77.902-2 Section 77.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... Approved ground check systems not employing pilot check wires. Ground check systems not employing pilot check wires shall be approved by the Secretary only after it has been determined that the...

  5. New method for lightning location using optical ground wire

    NASA Astrophysics Data System (ADS)

    Qin, Zhaoyu; Cheng, Zhaogu; Zhang, Zhiping; Zhu, Jianqiang; Li, Feng

    2006-12-01

    A new technology of lightning location is described, which is based on detecting the state of polarization (SOP) fluctuation of the laser light in the optic ground wire (OPGW). Compared with the conventional lightning location method, the new method is more accurate, more stable, and cheaper. Theories of Stokes parameters and Poincare sphere are introduced to analyze the SOP at the lightning strike point. It can be concluded that although the initial points of SOP on the Poincare sphere are random, the SOP fluctuation generated by lightning strike can still be accurately identified by detecting the velocity of polarization motion. A new algorithm to quantify the velocity is also introduced.

  6. Evaluation of Fibre Lifetime in Optical Ground Wire Transmission Lines

    NASA Astrophysics Data System (ADS)

    Grunvalds, R.; Ciekurs, A.; Porins, J.; Supe, A.

    2017-06-01

    In the research, measurements of polarisation mode dispersion of two OPGWs (optical ground wire transmission lines), in total four fibres, have been carried out, and the expected lifetime of the infrastructure has been assessed on the basis of these measurements. The cables under consideration were installed in 1995 and 2011, respectively. Measurements have shown that polarisation mode dispersion values for cable installed in 1995 are four times higher than that for cable installed in 2011, which could mainly be explained by technological differences in fibre production and lower fibre polarisation mode dispersion requirements in 1995 due to lack of high-speed (over 10 Gbit/s) optical transmission systems. The calculation methodology of non-refusal work and refusal probabilities, using the measured polarisation mode dispersion parameters, is proposed in the paper. Based on reliability calculations, the expected lifetime is then predicted, showing that all measured fibres most likely will be operational within minimum theoretical service life of 25 years accepted by the industry.

  7. Ground-state energy of the electron liquid in ultrathin wires.

    PubMed

    Fogler, Michael M

    2005-02-11

    The ground-state energy and the density correlation function of the electron liquid in a thin one-dimensional wire are computed. The calculation is based on an approximate mapping of the problem with a realistic Coulomb interaction law onto exactly solvable models of mathematical physics. This approach becomes asymptotically exact in the limit of a small wire radius but remains numerically accurate even for modestly thin wires.

  8. 30 CFR 75.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... wires; approval by the Secretary. 75.803-2 Section 75.803-2 Mineral Resources MINE SAFETY AND HEALTH... Underground High-Voltage Distribution § 75.803-2 Ground check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires will be approved only if it...

  9. 30 CFR 75.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... wires; approval by the Secretary. 75.803-2 Section 75.803-2 Mineral Resources MINE SAFETY AND HEALTH... Underground High-Voltage Distribution § 75.803-2 Ground check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires will be approved only if...

  10. 30 CFR 75.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... wires; approval by the Secretary. 75.803-2 Section 75.803-2 Mineral Resources MINE SAFETY AND HEALTH... Underground High-Voltage Distribution § 75.803-2 Ground check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires will be approved only if...

  11. 30 CFR 75.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... wires; approval by the Secretary. 75.803-2 Section 75.803-2 Mineral Resources MINE SAFETY AND HEALTH... Underground High-Voltage Distribution § 75.803-2 Ground check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires will be approved only if...

  12. 30 CFR 75.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... wires; approval by the Secretary. 75.803-2 Section 75.803-2 Mineral Resources MINE SAFETY AND HEALTH... Underground High-Voltage Distribution § 75.803-2 Ground check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires will be approved only if...

  13. Transient corona effects on a wire over the ground

    NASA Technical Reports Server (NTRS)

    Chen, K. C.

    1980-01-01

    The nuclear EMP effect on VLF/trailing wire antennas is investigated in relation to new features of corona effects. Previous experimental results on transmission lines with corona under E 80 kV/cm recorded in the nanosecond time frame are analyzed. A nonlinear macroscopic model which describes a transmission line with corona is discussed. The model not only accounts for overall waveform, but also describes the sharp changes in the waveform associated with the corona onset.

  14. OVERHEAD PROJECTION.

    ERIC Educational Resources Information Center

    HARTSELL, HORACE C.; VEENENDAAL, W.L.

    THE OVERHEAD PROJECTOR WAS DESIGNED TO FILL A RECOGNIZED NEED IN VISUAL COMMUNICATION. IT IS A TRANSPARENT, STILL PROJECTOR CAPABLE OF ENLARGING UP TO 10" X 10" TRANSPARENCIES. BY LOCATING THE PROJECTOR AT THE FRONT OF THE CLASSROOM ITS USE MAY BE MULTIPLIED. THE SIZE OF THE MATERIAL CAN BE EASILY AND QUICKLY CHANGED, SHAPES CAN BE…

  15. 30 CFR 77.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... wires; approval by the Secretary. 77.803-2 Section 77.803-2 Mineral Resources MINE SAFETY AND HEALTH... check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires shall be approved by the Secretary only if it is determined that the system...

  16. 30 CFR 77.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... wires; approval by the Secretary. 77.803-2 Section 77.803-2 Mineral Resources MINE SAFETY AND HEALTH... check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires shall be approved by the Secretary only if it is determined that the...

  17. 30 CFR 77.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... wires; approval by the Secretary. 77.803-2 Section 77.803-2 Mineral Resources MINE SAFETY AND HEALTH... check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires shall be approved by the Secretary only if it is determined that the...

  18. 30 CFR 77.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... wires; approval by the Secretary. 77.803-2 Section 77.803-2 Mineral Resources MINE SAFETY AND HEALTH... check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires shall be approved by the Secretary only if it is determined that the...

  19. 30 CFR 77.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... wires; approval by the Secretary. 77.803-2 Section 77.803-2 Mineral Resources MINE SAFETY AND HEALTH... check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires shall be approved by the Secretary only if it is determined that the...

  20. Hybrid modelling of near-field coupling onto grounded wire under ultra-short duration perturbation

    NASA Astrophysics Data System (ADS)

    Ravelo, B.; Liu, Y.

    2014-10-01

    A time-frequency (TF) hybrid model (HM) for investigating the interaction between EM near-field (NF) aggression and grounded wire is addressed. The HM is based on the combination of techniques for extracting the EM NF radiated by electronic structures and the calculation of electrical disturbances across the wire due to EM coupling. The computation method is fundamentally inspired from transmission line (TL) theory under EM illumination. The methodology including flow chart interpreting the routine algorithm based on the combination of frequency and time domain approaches is featured. An experimental result showing the EM coupling between patch antenna-wire from 1.5-3.5GHz reveals the efficiency of the HM in frequency domain. The relevance of this HM was illustrated with a structure comprised of 20cm aggressor and 5cm victim I-shaped wires placed above a planar ground plane. The aggressor was excited with 40ns duration perturbation signal. After Matlab implementation of the HM, the disturbance voltages across the extremity of the victim wire were extracted. This simple and fast HM is useful for the EMC engineering during the design and fabrication phases of electrical and electronic systems.

  1. Investigation of Axial Electric Field Measurements with Grounded-Wire TEM Surveys

    NASA Astrophysics Data System (ADS)

    Zhou, Nan-nan; Xue, Guo-qiang; Li, Hai; Hou, Dong-yang

    2017-09-01

    The grounded-wire transient electromagnetic (TEM) surveying is often performed along the equatorial direction with its observation lines paralleling to the transmitting wire with a certain transmitter-receiver distance. However, such method takes into account only the equatorial component of the electromagnetic field, and a little effort has been made on incorporating the other major component along the transmitting wire, here denoted as axial field. To obtain a comprehensive understanding of its fundamental characteristics and guide the designing of the corresponding observation system for reliable anomaly detection, this study for the first time investigates the axial electric field from three crucial aspects, including its decay curve, plane distribution, and anomaly sensitivity, through both synthetic modeling and real application to one major coal field in China. The results demonstrate a higher sensitivity to both high- and low-resistivity anomalies by the electric field in axial direction and confirm its great potentials for robust anomaly detection in the subsurface.

  2. Ground characterization of the Wide-field Infrared Explorer (WIRE) instrument

    NASA Astrophysics Data System (ADS)

    Kemp, John C.; Larsen, Mark F.; Peterson, James Q.; Sargent, Steven D.

    1998-11-01

    The Wide-Field Infrared Explorer (WIRE) is a small cryogenic spaceborne infrared telescope being readied for launch in September 1998 as the fifth of NASA's Small Explorers. WIRE utilizes two 128 X 128 Si:As Focal Plane Arrays (FPAs) produced by Boeing North American with a 30 cm diameter Ritchey Cretien diamond turned mirror system. This mission takes advantage of recent advances in infrared array detector technology to provide a large sensitivity gain over previously flown missions. Two broad pass bands are defined for a deep pointed survey to search for protogalaxies and to study the evolution of starburst galaxies. The Space Dynamics Laboratory at Utah State University (SDL/USU) used the multifunction infrared calibrator and other special purpose cryogenic equipment to perform a ground characterization of the WIRE instrument. The focus was verified cold with two independent measurements. Both in-band and out-of-band Relative Spectral Response measurements were made; some sensitivity to temperature, bias voltage, and location on the long wavelength focal plane array were found. Dark current and dark noise measurements are also reported.

  3. The rocket-and-wire triggering process: Channel-base currents and ground-level electric fields

    NASA Astrophysics Data System (ADS)

    Ngin, Terry Keo

    Rocket-and-wire triggered lightning flashes were studied from 2011 to 2013 at the International Center for Lightning Research and Testing. Ground-level electric fields and channel-base currents were recorded for 79 rocket launches. An eight-station network of electric field meters along with a milliampere-scale wire-base current measurement and a high-speed video record of the wire ascent allowed the calculation and analysis of the trigger-wire line charge density, generally found to be in the muC m-1 to hundreds of muC m-1 range and to increase quadratically with height. The wire-base currents collected during the wire ascent here are the most comprehensive in the literature to date. The trigger-wire line charge density, electric field at ground level, and characteristics of precursor pulses at the wire tip were examined to determine their usefulness in predicting the success or failure of a triggered-lightning attempt. The usefulness of the PICASSO model of space charge evolution from ground, originally developed by researchers at Paul Sabatier University in the 1980s, as a triggering criterion was also evaluated. An electrostatic model of the corona sheath around the trigger-wire was developed in order to estimate the radial extent of the corona sheath and the charge distribution within the corona sheath as a function of measured electric fields aloft taken from the published literature. The most sensitive measurements to date of channel-base current flowing prior to subsequent return strokes, where the current had generally been considered to be zero, were collected and are analyzed here. The channel-base current before return strokes was found to average 5.3 mA with a 2.8 mA standard deviation prior to 120 measured return strokes.

  4. Overhead Projector Demonstrations.

    ERIC Educational Resources Information Center

    Hambly, Gordon F.; Goldsmith, Robert H.

    1988-01-01

    Presented is a method of demonstrating the optical activity of glucose using an overhead projector and easily obtainable materials. Explores the difference between reflected and transmitted light (Tyndall Effect) using sodium thiosulfate, hydrochloric acid, and an overhead projector. (ML)

  5. Overhead Projector Demonstrations.

    ERIC Educational Resources Information Center

    Kolb, Doris, Ed.

    1989-01-01

    Described are two demonstrations for teaching chemistry using the overhead projector. Included are "Oxidation of Cyclohexanol--An Amoebalike Reaction," and "A Diels-Alder Reaction for the Overhead Projector." Materials and procedures are detailed. (CW)

  6. Overhead Projector Demonstrations.

    ERIC Educational Resources Information Center

    Hambly, Gordon F.; Goldsmith, Robert H.

    1988-01-01

    Presented is a method of demonstrating the optical activity of glucose using an overhead projector and easily obtainable materials. Explores the difference between reflected and transmitted light (Tyndall Effect) using sodium thiosulfate, hydrochloric acid, and an overhead projector. (ML)

  7. Wire position system to consistently measure and record the location change of girders following ground changes

    NASA Astrophysics Data System (ADS)

    Choi, H. J.; Lee, S. B.; Lee, H. G.; Y Back, S.; Kim, S. H.; Kang, H. S.

    2017-07-01

    Several parts that comprise the large scientific device should be installed and operated at the accurate three-dimensional location coordinates (X, Y, and Z) where they should be subjected to survey and alignment. The location of the aligned parts should not be changed in order to ensure that the electron beam parameters (Energy 10 GeV, Charge 200 pC, and Bunch Length 60 fs, Emittance X/Y 0.481 μm/0.256 μm) of PAL-XFEL (X-ray Free Electron Laser of the Pohang Accelerator Laboratory) remain stable and can be operated without any problems. As time goes by, however, the ground goes through uplift and subsidence, which consequently deforms building floors. The deformation of the ground and buildings changes the location of several devices including magnets and RF accelerator tubes, which eventually leads to alignment errors (∆X, ∆Y, and ∆Z). Once alignment errors occur with regard to these parts, the electron beam deviates from its course and beam parameters change accordingly. PAL-XFEL has installed the Hydrostatic Leveling System (HLS) to measure and record the vertical change of buildings and ground consistently and systematically and the Wire Position System (WPS) to measure the two dimensional changes of girders. This paper is designed to introduce the operating principle and design concept of WPS and discuss the current situation regarding installation and operation.

  8. 9. Interior view, overhead line shafting and lathe workbench, east ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Interior view, overhead line shafting and lathe workbench, east shop, ground floor, looking northwest. - Larrabee & Hingston Company, Main Shop Building, 19 Howley Street, Peabody, Essex County, MA

  9. Computer Program for Thin Wire Antenna over a Perfectly Conducting Ground Plane. [using Galerkins method and sinusoidal bases

    NASA Technical Reports Server (NTRS)

    Richmond, J. H.

    1974-01-01

    A computer program is presented for a thin-wire antenna over a perfect ground plane. The analysis is performed in the frequency domain, and the exterior medium is free space. The antenna may have finite conductivity and lumped loads. The output data includes the current distribution, impedance, radiation efficiency, and gain. The program uses sinusoidal bases and Galerkin's method.

  10. Remote Overhead Video Extendable Robot

    SciTech Connect

    Heckendorn, F.M.; Ward, C.R.

    1989-01-01

    The Savannah River Plant (SRP) production of nuclear materials utilizes a waste storage farm, for radioactive waste products. The operation of the waste farm requires manipulation of piping and vessels within below ground pump pits, by overhead crane. A resultant potential exists for personnel exposure to radiation when any direct viewing is used to control crane operations. The Savannah River Laboratory (SRL) has developed a Remote Overhead Video Extendable Robot (ROVER) as a means of reducing the exposure of personnel to nuclear radiation in the waste storage farm. ROVER has been developed, and turned over to the plant area for usage over the pump pits. All operation and control of ROVER are from a remotely located Video Van, located well away from the potentially hazardous operations. 4 figs.

  11. Wire-grid electromagnetic modelling of metallic cylindrical objects with arbitrary section, for Ground Penetrating Radar applications

    NASA Astrophysics Data System (ADS)

    Adabi, Saba; Pajewski, Lara

    2014-05-01

    This work deals with the electromagnetic wire-grid modelling of metallic cylindrical objects, buried in the ground or embedded in a structure, for example in a wall or in a concrete slab. Wire-grid modelling of conducting objects was introduced by Richmond in 1966 [1] and, since then, this method has been extensively used over the years to simulate arbitrarily-shaped objects and compute radiation patterns of antennas, as well as the electromagnetic field scattered by targets. For any wire-grid model, a fundamental question is the choice of the optimum wire radius and grid spacing. The most widely used criterion to fix the wire size is the so-called same-area rule [2], coming from empirical observation: the total surface area of the wires has to be equal to the surface area of the object being modelled. However, just few authors have investigated the validity of this criterion. Ludwig [3] studied the reliability of the rule by examining the canonical radiation problem of a transverse magnetic field by a circular cylinder fed with a uniform surface current, compared with a wire-grid model; he concluded that the same-area rule is optimum and that too thin wires are just as bad as too thick ones. Paknys [4] investigated the accuracy of the same-area rule for the modelling of a circular cylinder with a uniform current on it, continuing the study initiated in [3], or illuminated by a transverse magnetic monochromatic plane wave; he deduced that the same-area rule is optimal and that the field inside the cylinder is most sensitive to the wire radius than the field outside the object, so being a good error indicator. In [5], a circular cylinder was considered, embedded in a dielectric half-space and illuminated by a transverse magnetic monochromatic plane wave; the scattered near field was calculated by using the Cylindrical-Wave Approach and numerical results, obtained for different wire-grid models in the spectral domain, were compared with the exact solution. The

  12. Overhead Image Statistics

    SciTech Connect

    Vijayaraj, Veeraraghavan; Cheriyadat, Anil M; Bhaduri, Budhendra L; Vatsavai, Raju; Bright, Eddie A

    2008-01-01

    Statistical properties of high-resolution overhead images representing different land use categories are analyzed using various local and global statistical image properties based on the shape of the power spectrum, image gradient distributions, edge co-occurrence, and inter-scale wavelet coefficient distributions. The analysis was performed on a database of high-resolution (1 meter) overhead images representing a multitude of different downtown, suburban, commercial, agricultural and wooded exemplars. Various statistical properties relating to these image categories and their relationship are discussed. The categorical variations in power spectrum contour shapes, the unique gradient distribution characteristics of wooded categories, the similarity in edge co-occurrence statistics for overhead and natural images, and the unique edge co-occurrence statistics of downtown categories are presented in this work. Though previous work on natural image statistics has showed some of the unique characteristics for different categories, the relationships for overhead images are not well understood. The statistical properties of natural images were used in previous studies to develop prior image models, to predict and index objects in a scene and to improve computer vision models. The results from our research findings can be used to augment and adapt computer vision algorithms that rely on prior image statistics to process overhead images, calibrate the performance of overhead image analysis algorithms, and derive features for better discrimination of overhead image categories.

  13. Overhead Projector Demonstrations.

    ERIC Educational Resources Information Center

    Kolb, Doris, Ed.

    1987-01-01

    Describes several chemistry demonstrations that use an overhead projector. Some of the demonstrations deal with electrochemistry, and another deals with the reactions of nonvolatile immiscible liquid in water. (TW)

  14. Anania Shirakatsi's Overheads System

    NASA Astrophysics Data System (ADS)

    Eynatyan, Julieta

    2014-10-01

    A review of Anania Shirakatsi's overheads system is given based on his chronological works. Lunar, solar and lunisolar calendars are discussed. Anania Shirakatsi is presented as having an important role in the establishment of the Armenian unique chronology.

  15. Overhead Projector Demonstrations.

    ERIC Educational Resources Information Center

    Kolb, Doris, Ed.

    1989-01-01

    Described are demonstrations of the optical activity of two sugar solutions, and the effects of various substituents on acid strength using an overhead projector. Materials and procedures for each demonstration are discussed. (CW)

  16. Ground-State Electronic Structure of Quasi-One-Dimensional Wires in Semiconductor Heterostructures

    NASA Astrophysics Data System (ADS)

    Owen, E. T.; Barnes, C. H. W.

    2016-11-01

    We apply density-functional theory, in the local-density approximation, to a quasi-one-dimensional electron gas in order to quantify the effect of Coulomb and correlation effects in modulating and, therefore, patterning, the charge-density distribution. Our calculations are presented specifically for surface-gate-defined quasi-one-dimensional quantum wires in a GaAs-(AlGa)As heterostructure, but we expect our results to apply more generally for other low-dimensional semiconductor systems. We show that at high densities with strong confinement, screening of electrons in the direction transverse to the wire is efficient and density modulations are not visible. In the low-density, weak-confinement regime, the exchange-correlation potential induces small density modulations as the electrons are depleted from the wire. At the weakest confinements and lowest densities, the electron density splits into two rows, thereby forming a pair of quantum wires that lies beneath the surface gates. An additional double-well external potential forms at very low density which enhances this row-splitting phenomenon. We produce phase diagrams that show a transition between the presence of a single quantum wire in a split-gate structure and two quantum wires. We suggest that this phenomenon can be used to pattern and modulate the electron density in low-dimensional structures with particular application to systems where a proximity effect from a surface gate is valuable.

  17. Analysis of the Induced Currents on a Section of Parallel Wires in Front of a Ground Plane.

    DTIC Science & Technology

    1982-12-01

    RADIATED FIELD PATH 0 0 WIRES SW IRES GROUND PLANE, Figure 1. Side view of a Cassegrainian Antenna with wire reflector surfaces. S2 In order to...8217 UBR j W r i g h t - P a t t o r -; n A 3 9 O h i o 4 ,5 4 3 3 - C , 0 R 1 -4 L it. ON POLLING OFFICE NAME AND ADDRNESS 12. REoR Jt Dee). ir 19p...Block 20, if different from. ffiporrt; tO. SU~t’LE~N~A’re NC lot 5pO.CItulY6r, r~if IAW AnH 1941-17. DeL~n 1, T !-Anol flevetoPM601 * ? ir Ic- C I"eJe

  18. Demonstrating Forces between Parallel Wires.

    ERIC Educational Resources Information Center

    Baker, Blane

    2000-01-01

    Describes a physics demonstration that dramatically illustrates the mutual repulsion (attraction) between parallel conductors using insulated copper wire, wooden dowels, a high direct current power supply, electrical tape, and an overhead projector. (WRM)

  19. Demonstrating Forces between Parallel Wires.

    ERIC Educational Resources Information Center

    Baker, Blane

    2000-01-01

    Describes a physics demonstration that dramatically illustrates the mutual repulsion (attraction) between parallel conductors using insulated copper wire, wooden dowels, a high direct current power supply, electrical tape, and an overhead projector. (WRM)

  20. Overhead Projector Demonstrations.

    ERIC Educational Resources Information Center

    Kolb, Doris, Ed.

    1988-01-01

    Details two demonstrations for use with an overhead projector in a chemistry lecture. Includes "A Very Rapidly Growing Silicate Crystal" and "A Colorful Demonstration to Simulate Orbital Hybridization." The materials and directions for each demonstration are included as well as a brief explanation of the essential learning involved. (CW)

  1. 15. INTERIOR, INSPECTION PITS, OVERHEAD CATWALKS AND OVERHEAD CRANE SUPPORT, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. INTERIOR, INSPECTION PITS, OVERHEAD CATWALKS AND OVERHEAD CRANE SUPPORT, FACING WEST - Delaware, Lackawanna & Western Railroad Freight & Rail Yard, Multiple Unit Light Inspection Shed, New Jersey Transit Hoboken Terminal Rail Yard, Hoboken, Hudson County, NJ

  2. Operative Mechanism of Hole-Assisted Negative Charge Motion in Ground States of Radical-Anion Molecular Wires.

    PubMed

    Franco, Carlos; Burrezo, Paula Mayorga; Lloveras, Vega; Caballero, Rubén; Alcón, Isaac; Bromley, Stefan T; Mas-Torrent, Marta; Langa, Fernando; López Navarrete, Juan T; Rovira, Concepciò; Casado, Juan; Veciana, Jaume

    2017-01-18

    Charge transfer/transport in molecular wires over varying distances is a subject of great interest. The feasible transport mechanisms have been generally accounted for on the basis of tunneling or superexchange charge transfer operating over small distances which progressively gives way to hopping transport over larger distances. The underlying molecular sequential steps that likely take place during hopping and the operative mechanism occurring at intermediate distances have received much less attention given the difficulty in assessing detailed molecular-level information. We describe here the operating mechanisms for unimolecular electron transfer/transport in the ground state of radical-anion mixed-valence derivatives occurring between their terminal perchlorotriphenylmethyl/ide groups through thiophene-vinylene oligomers that act as conjugated wires of increasing length up to 53 Å. The unique finding here is that the net transport of the electron in the larger molecular wires is initiated by an electron-hole dissociation intermediated by hole delocalization (conformationally assisted and thermally dependent) forming transient mobile polaronic states in the bridge that terminate by an electron-hole recombination at the other wire extreme. On the contrary, for the shorter radical-anions our results suggest that a flickering resonance mechanism which is intermediate between hopping and superexchange is the operative one. We support these mechanistic interpretations by applying the pertinent biased kinetic models of the charge/spin exchange rates determined by electron paramagnetic resonance and by molecular structural level information obtained from UV-vis and Raman spectroscopies and by quantum chemical modeling.

  3. Overhead camshaft engine

    SciTech Connect

    Honma, M.

    1987-07-21

    This patent describes an overhead camshaft engine comprising: a cylinder block; a cylinder head; a fastening member for fastening the cylinder head to the cylinder block; a valve reciprocally mounted in the cylinder head; and a camshaft rotatably mounted over the cylinder head to control reciprocation of the valve; the camshaft being so arranged, with respect to a plan view, as to lap in part over the fastening member and formed with a peripheral cut at a portion where it laps over the fastening member to facilitate insertion and removal of the fastening member.

  4. Overhead-valve engine

    SciTech Connect

    Tamba, S.; Miyake, H.; Fukui, N.

    1987-05-05

    An overhead valve engine is described comprising: push rod receiving bores, at least one of the push rod receiving bores being maintained in communication at one end with a crank chamber and at an opposite end with a rocker arm chamber and at least one other push rod receiving bore being maintained in communication with the rocker arm chamber; push rods contained within push rod receiving bores; and a breather chamber in communication with at least one other push rod receiving bore in the vicinity of a camshaft.

  5. Numerical analysis of complex impedance and microwave absorption of metamaterials composed of split cut wires on grounded dielectric substrate

    NASA Astrophysics Data System (ADS)

    Lim, Jun-Hee; Liu, Tian; Kim, Sung-Soo

    2014-06-01

    The microwave absorption of metamaterials composed of split cut wire (SCW) on grounded dielectric substrate has been investigated on the basis of equivalent transmission line circuit. S-parameters (S 11 and S 21) and input impedance are numerically simulated with variations of the thickness and dielectric loss of the substrate and the geometry of the SCW. Magnetic resonance resulting from antiparallel currents between SCW and ground plane was observed at the frequency of minimum reflection loss. The simulated resonance frequency and reflection loss can be explained well on the basis of the circuit theory of an LC resonator. Analysis of the input impedance of the high impedance surface has shown that perfect absorption can be obtained at the optimized impedance-matching condition, which is dependent on SCW width, thickness and the dielectric loss of the substrate. Better insight into the absorption mechanism of metamaterial absorbers can be attained through the parametric analysis on complex impedance of SCW and its relationship with reflection loss.

  6. The impact of overhead lines for employees with stents

    NASA Astrophysics Data System (ADS)

    Syrek, P.; Skowron, M.

    2017-05-01

    The aim of article is to discuss interaction between stents implanted in the body of worker and harmonic magnetic field in the vicinity of electric wires. In last decades, a growing proportion of people has any devices implanted, to list: cardiac pacemakers, cardioverter - defibrillators. Recommendations of International Commision on Non-ionizing Radiation Protection (ICNIRP), and resctrictions imposed in different states, may exlude specific individuals from their duties. The autors focused on the situation, when the employee with stent, works in the immediate vicinity of overhead electric wires, cleaning with dry ice the electric insulators.

  7. Change in the direction of electric wind from a wire electrode tilted relative to a grounded plane

    NASA Astrophysics Data System (ADS)

    Elagin, I. A.; Begal', D. I.; Ashikhmin, I. A.; Stishkov, Yu. K.

    2017-01-01

    We report on experimental investigations of the structure of electric (ionic) wind in the wire-versus-plane electrode system with a constant interelectrode gap and variable wire tilt angle relative to the plane. Characteristic wind velocity distributions were determined using a laser Doppler anemometry technique. It is established that the position of the narrow central jet of the wind significantly changes depending on the tilt of the corona-forming electrode.

  8. 49 CFR 236.754 - Line, open wire.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Line, open wire. 236.754 Section 236.754 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... Line, open wire. An overhead wire line consisting of single conductors as opposed to multiple-conductor...

  9. 49 CFR 236.754 - Line, open wire.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Line, open wire. 236.754 Section 236.754 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... Line, open wire. An overhead wire line consisting of single conductors as opposed to...

  10. 49 CFR 236.754 - Line, open wire.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Line, open wire. 236.754 Section 236.754 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... Line, open wire. An overhead wire line consisting of single conductors as opposed to...

  11. 49 CFR 236.754 - Line, open wire.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Line, open wire. 236.754 Section 236.754 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... Line, open wire. An overhead wire line consisting of single conductors as opposed to...

  12. 49 CFR 236.754 - Line, open wire.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Line, open wire. 236.754 Section 236.754 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... Line, open wire. An overhead wire line consisting of single conductors as opposed to...

  13. Predictive model of avian electrocution risk on overhead power lines.

    PubMed

    Dwyer, J F; Harness, R E; Donohue, K

    2014-02-01

    Electrocution on overhead power structures negatively affects avian populations in diverse ecosystems worldwide, contributes to the endangerment of raptor populations in Europe and Africa, and is a major driver of legal action against electric utilities in North America. We investigated factors associated with avian electrocutions so poles that are likely to electrocute a bird can be identified and retrofitted prior to causing avian mortality. We used historical data from southern California to identify patterns of avian electrocution by voltage, month, and year to identify species most often killed by electrocution in our study area and to develop a predictive model that compared poles where an avian electrocution was known to have occurred (electrocution poles) with poles where no known electrocution occurred (comparison poles). We chose variables that could be quantified by personnel with little training in ornithology or electric systems. Electrocutions were more common at distribution voltages (≤ 33 kV) and during breeding seasons and were more commonly reported after a retrofitting program began. Red-tailed Hawks (Buteo jamaicensis) (n = 265) and American Crows (Corvus brachyrhynchos) (n = 258) were the most commonly electrocuted species. In the predictive model, 4 of 14 candidate variables were required to distinguish electrocution poles from comparison poles: number of jumpers (short wires connecting energized equipment), number of primary conductors, presence of grounding, and presence of unforested unpaved areas as the dominant nearby land cover. When tested against a sample of poles not used to build the model, our model distributed poles relatively normally across electrocution-risk values and identified the average risk as higher for electrocution poles relative to comparison poles. Our model can be used to reduce avian electrocutions through proactive identification and targeting of high-risk poles for retrofitting. © 2013 Society for Conservation

  14. Measurement of SIFT operating system overhead

    NASA Technical Reports Server (NTRS)

    Palumbo, D. L.; Butler, R. W.

    1985-01-01

    The overhead of the software implemented fault tolerance (SIFT) operating system was measured. Several versions of the operating system evolved. Each version represents different strategies employed to improve the measured performance. Three of these versions are analyzed. The internal data structures of the operating systems are discussed. The overhead of the SIFT operating system was found to be of two types: vote overhead and executive task overhead. Both types of overhead were found to be significant in all versions of the system. Improvements substantially reduced this overhead; even with these improvements, the operating system consumed well over 50% of the available processing time.

  15. Spectroscopy on the Overhead Projector.

    ERIC Educational Resources Information Center

    Solomon, Sally; And Others

    1994-01-01

    Any overhead projector easily can be converted into a simple spectrometer by placing a piece of diffraction grating over the projecting lens. A detailed description of the apparatus and suggested spectroscopy experiments are included. Demonstrations can utilize solutions of cobalt chloride, potassium permanganate, potassium dichromate, or…

  16. Creating Great Overheads with Computers.

    ERIC Educational Resources Information Center

    Gribas, Cyndy; And Others

    1996-01-01

    Steps in preparing effective overhead projector transparencies for college instruction are outlined, using the PowerPoint program for Windows. They include thinking analogically in translating from concept to visual form; using the features of the presentation program to create a polished product; and assuring readability (visibility, typeface…

  17. Spectroscopy on the Overhead Projector.

    ERIC Educational Resources Information Center

    Solomon, Sally; And Others

    1994-01-01

    Any overhead projector easily can be converted into a simple spectrometer by placing a piece of diffraction grating over the projecting lens. A detailed description of the apparatus and suggested spectroscopy experiments are included. Demonstrations can utilize solutions of cobalt chloride, potassium permanganate, potassium dichromate, or…

  18. Creating Great Overheads with Computers.

    ERIC Educational Resources Information Center

    Gribas, Cyndy; And Others

    1996-01-01

    Steps in preparing effective overhead projector transparencies for college instruction are outlined, using the PowerPoint program for Windows. They include thinking analogically in translating from concept to visual form; using the features of the presentation program to create a polished product; and assuring readability (visibility, typeface…

  19. Manipulator system for constructing overhead distribution lines

    SciTech Connect

    Ohnishi, H.; Tsuchihashi, H.; Waki, S.; Mochizuki, K. ); Yamamoto, T.; Watanabe, H. ); Furukawa, H. )

    1993-04-01

    This paper describes the manipulator for live-line construction of high-voltage overhead power transmission lines (line voltage 6.6 kV) that is being jointly developed by Tokyo Electric Power and other companies. It describes this system's development concept, makeup, functions, and design, as well as operability tests using actual-scale transmission line poles. In this research, development began in 1984. As the first step, a prototype model of a ground-mounted twin-arm manipulator was trial-manufactured in 1985. As the second step, in 1988 a truck-mounted system was developed in which the twin-arm manipulator was mounted on a cherrypicker vehicle. As the third step, a practical system was developed based on these results.

  20. Quantum compiling with low overhead

    NASA Astrophysics Data System (ADS)

    Duclos-Cianci, Guillaume; Poulin, David

    2014-03-01

    I will present a scheme to compile complex quantum gates that uses significantly fewer resources than existing schemes. In standard fault-tolerant protocols, a magic state is distilled from noisy resources, and copies of this magic state are then assembled into produced complex gates using the Solovay-Kitaev theorem or variants thereof. In our approach, we instead directly distill magic states associated to complex gates from noisy resources, leading to a reduction of the compiling overhead of several orders of magnitude.

  1. Overhead View of Pathfinder Landing Site

    NASA Technical Reports Server (NTRS)

    1997-01-01

    Planimetric (overhead view) map of the landing site, to a distance of 20 meters from the spacecraft. North is at the top in this and Plates 3-5. To produce this map, images were geometrically projected onto an assumed mean surface representing the ground. Features above the ground plane (primarily rocks) therefore appear displaced radially outward; the amount of distortion increases systematically with distance. The upper surfaces of the lander and rover also appear enlarged and displaced because of their height. Primary grid (white) is based on the Landing Site Cartographic (LSC) coordinate system, defined with X eastward, Y north, and Z up, and origin located at the mean ground surface immediately beneath the deployed position of the IMP camera gimbal center. Secondary ticks (cyan) are based on the Mars local level (LL) frame, which has X north, Y east, Z down, with origin in the center of the lander baseplate. Rover positions (including APXS measurements) are commonly reported in the LL frame. Yellow grid shows polar coordinates based on the LSC system. Cartographic image processing by U.S. Geological Survey.

    NOTE: original caption as published in Science Magazine

    Mars Pathfinder is the second in NASA's Discovery program of low-cost spacecraft with highly focused science goals. The Jet Propulsion Laboratory, Pasadena, CA, developed and manages the Mars Pathfinder mission for NASA's Office of Space Science, Washington, D.C. JPL is a division of the California Institute of Technology (Caltech).

  2. Proximal Biceps in Overhead Athletes.

    PubMed

    Chalmers, Peter N; Verma, Nikhil N

    2016-01-01

    The proximal long head of the biceps tendon and its attachment at the superior glenoid tubercle and labrum are subject to a spectrum of disorders in overhead athletes. Biceps disorders are commonly characterized by intermittent anterior or deep-seated shoulder pain exacerbated by activity. Diagnosis is reached via various physical examination maneuvers; MRI can be uncertain. Nonsteroidal anti-inflammatory medications, targeted ultrasound-guided corticosteroid injections, and supervised physical therapy are the mainstays of nonoperative treatment. Operative treatment, which remains controversial, provides reliable pain relief, restoration of function for activities of daily living, and low complication rates, but return to play can be unpredictable.

  3. Reliable Wiring Harness

    NASA Technical Reports Server (NTRS)

    Gaspar, Kenneth C.

    1987-01-01

    New harness for electrical wiring includes plugs that do not loosen from vibration. Ground braids prevented from detaching from connectors and constrained so braids do not open into swollen "birdcage" sections. Spring of stainless steel encircles ground braid. Self-locking connector contains ratchet not only preventing connector from opening, but tightens when vibrated.

  4. Basic Wiring.

    ERIC Educational Resources Information Center

    Kaltwasser, Stan; And Others

    This module is the first in a series of three wiring publications; it serves as the foundation for students enrolled in a wiring program. It is a prerequisite to either "Residential Wiring" or "Commercial and Industrial Wiring." The module contains 16 instructional units that cover the following topics: occupational…

  5. 30 CFR 1220.012 - Overhead allowance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OIL AND GAS LEASES § 1220.012 Overhead allowance. (a) During the capital recovery period the overhead... allocable joint costs charged to the NPSL capital account, exclusive of costs specified in paragraph (c) of... joint costs charged to the NPSL capital account, exclusive of costs specified in paragraph (c) of this...

  6. Limiting electric fields of HVDC overhead power lines.

    PubMed

    Leitgeb, N

    2014-05-01

    As a consequence of the increased use of renewable energy and the now long distances between energy generation and consumption, in Europe, electric power transfer by high-voltage (HV) direct current (DC) overhead power lines gains increasing importance. Thousands of kilometers of them are going to be built within the next years. However, existing guidelines and regulations do not yet contain recommendations to limit static electric fields, which are one of the most important criteria for HVDC overhead power lines in terms of tower design, span width and ground clearance. Based on theoretical and experimental data, in this article, static electric fields associated with adverse health effects are analysed and various criteria are derived for limiting static electric field strengths.

  7. 30 CFR 57.12053 - Circuits powered from trolley wires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Circuits powered from trolley wires. 57.12053... Electricity Surface and Underground § 57.12053 Circuits powered from trolley wires. Ground wires for lighting circuits powered from trolley wires shall be connected securely to the ground return circuit. Surface Only ...

  8. 30 CFR 57.12053 - Circuits powered from trolley wires.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Circuits powered from trolley wires. 57.12053... Electricity Surface and Underground § 57.12053 Circuits powered from trolley wires. Ground wires for lighting circuits powered from trolley wires shall be connected securely to the ground return circuit. Surface Only ...

  9. 30 CFR 57.12053 - Circuits powered from trolley wires.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Circuits powered from trolley wires. 57.12053... Electricity Surface and Underground § 57.12053 Circuits powered from trolley wires. Ground wires for lighting circuits powered from trolley wires shall be connected securely to the ground return circuit. Surface Only ...

  10. 30 CFR 57.12053 - Circuits powered from trolley wires.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Circuits powered from trolley wires. 57.12053... Electricity Surface and Underground § 57.12053 Circuits powered from trolley wires. Ground wires for lighting circuits powered from trolley wires shall be connected securely to the ground return circuit. Surface Only ...

  11. 30 CFR 57.12053 - Circuits powered from trolley wires.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Circuits powered from trolley wires. 57.12053... Electricity Surface and Underground § 57.12053 Circuits powered from trolley wires. Ground wires for lighting circuits powered from trolley wires shall be connected securely to the ground return circuit. Surface Only ...

  12. Application of a relational data base for documenting the Ground Test Accelerator cable routing and wiring interconnections

    SciTech Connect

    Blackwell, D.B.; Rogers, W.L.; Brown, V.W.; Ekeroth, G.A.; McGill, T.O.

    1990-01-01

    The Ground Test Accelerator (GTA) has many different types of equipment and interconnections to support the operation. Various functions are performed by these equipments such as signal generation, instrument control, and diagnostics. All of the thousands of signals must be routed from the protected tunnel area into the operational control area of the building. Tabulating the routing of these cables, interconnections, terminations, and even the installation status, results in an enormous amount of data collection and maintenance. A relational data base program called Wireflex was written to allow real-time storage, instant recall, and reporting of this information. The operational environment is the VAX network with password security to protect the integrity of the stored data. The format of the program data bases, with the relatioships and interchange of information, will be described. Examples of input forms will show the type of information being stored and the indexing for searching specific entries. Reports will also be included displaying the flexibility of types as well as the ability to recover specific entries or ranges of information.

  13. Overhead tray for cable test system

    NASA Technical Reports Server (NTRS)

    Saltz, K. T.

    1976-01-01

    System consists of overhead slotted tray, series of compatible adapter cables, and automatic test set which consists of control console and cable-switching console. System reduces hookup time and also reduces cost of fabricating and storing test cables.

  14. Overhead Door Company of Charleston Information Sheet

    EPA Pesticide Factsheets

    Overhead Door Company of Charleston (the Company) is located in North Charleston, South Carolina. The settlement involves renovation activities conducted at a property constructed prior to 1978, located in Isle of Palms, South Carolina.

  15. Wire stripper

    NASA Technical Reports Server (NTRS)

    Economu, M. A. (Inventor)

    1978-01-01

    An insulation stripper is described which is especially useful for shielded wire, the stripper including a first pair of jaws with blades extending substantially perpendicular to the axis of the wire, and a second pair of jaws with blades extending substantially parallel to the axis of the wire. The first pair of jaws is pressed against the wire so the blades cut into the insulation, and the device is turned to form circumferential cuts in the insulation. Then the second pair of jaws is pressed against the wire so the blades cut into the insulation, and the wire is moved through the device to form longitudinal cuts that permit easy removal of the insulation. Each of the blades is located within the concave face of a V-block, to center the blades on the wire and to limit the depth of blade penetration.

  16. Gamma-ray dose from an overhead plume

    DOE PAGES

    McNaughton, Michael W.; Gillis, Jessica McDonnel; Ruedig, Elizabeth; ...

    2017-05-01

    Standard plume models can underestimate the gamma-ray dose when most of the radioactive material is above the heads of the receptors. Typically, a model is used to calculate the air concentration at the height of the receptor, and the dose is calculated by multiplying the air concentration by a concentration-to-dose conversion factor. Models indicate that if the plume is emitted from a stack during stable atmospheric conditions, the lower edges of the plume may not reach the ground, in which case both the ground-level concentration and the dose are usually reported as zero. However, in such cases, the dose frommore » overhead gamma-emitting radionuclides may be substantial. Such underestimates could impact decision making in emergency situations. The Monte Carlo N-Particle code, MCNP, was used to calculate the overhead shine dose and to compare with standard plume models. At long distances and during unstable atmospheric conditions, the MCNP results agree with the standard models. As a result, at short distances, where many models calculate zero, the true dose (as modeled by MCNP) can be estimated with simple equations.« less

  17. Study of Corrosion Resistance Improvement by Metallic Coating for Overhead Transmission Line Conductor

    NASA Astrophysics Data System (ADS)

    Isozaki, Masanori; Adachi, Kouichi; Hita, Takanori; Asano, Yuji

    Applying anti-corrosion grease and aluminum clad steel (AC) wires to ACSR has adopted as general methods to prevent overhead transmission line conductors and/or wires from corrosion. However, there are some cases that ineffectiveness of those means are reported on some transmission lines passing through acid atmosphere in the vicinity of a factory exhausting acid smoke. The feature of the corrosion caused by acid atmosphere is to show a higher speed in its progressing as well known. As means against such acid corrosion, application of high purity aluminum, selective removal of inter-metallic compound in aluminum and plastic coating wires has been reported before, and each has both of advantage and disadvantage actually. In the former letter, we reported the new type of anti-corrosion grease that shows an excellent property against acid atmosphere as well as in a salty circumstance. Here presents a new type of anti-corrosion technology of applying high corrosion resistance aluminum alloy or zinc coatings on each component wires of a conductor that we succeed in developing through a serial study of anti-corrosion methods on overhead transmission lines.

  18. Self-actuating grapple automatically engages and releases loads from overhead cranes

    NASA Technical Reports Server (NTRS)

    Froehlich, J. A.; Karastas, G. A.

    1966-01-01

    Two-piece grapple mechanism consisting of a lift knob secured to the load and a grapple member connected to the crane or lift automatically disengages the load from the overhead lifting device when the load contacts the ground. The key feature is the sliding collar under the lift knob which enables the grapple latch to be stripped off over the lift knob.

  19. 45. MACHINE SHOP NORTH/NORTHEAST INCLUDING OVERHEAD LINE SHAFTING. MOSTLY BELT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. MACHINE SHOP NORTH/NORTHEAST INCLUDING OVERHEAD LINE SHAFTING. MOSTLY BELT DRIVEN WITH ONE ROPE DRIVEN LATHE IN MIDDLE GROUND. POWER COMES FROM KNIGHT TURBINE ON FAR WALL SHOWN IN K-77, 78 (42') - Knight Foundry, 13 Eureka Street, Sutter Creek, Amador County, CA

  20. Design and Application of Cables and Overhead Lines in Wind Power Plants

    SciTech Connect

    Behnke, M. R.; Bellei, T.A.; Bloethe, W.G.; Bradt, M.; Brooks, C.; Camm, E H; Dilling, W.; Goltz, B.; Hermanson, J.; Li, J.; Loy, P.; McLean, K.; Niemira, J.; Nuckles, K.; Patino, J.; Reza, M; Richardson, B.; Samaan, N.; Schoene, Jens; Smith, Travis M; Snyder, Isabelle B; Starke, Michael R; Tesch, M.; Walling, R.; Zahalka, G.

    2010-01-01

    This paper presents a summary of the most impor- tant considerations for wind power plant collection system un- derground and overhead cable designs. Various considerations, including conductor selection, soil thermal properties, installa- tion methods, splicing, concentric grounding, and NESC/NEC requirements are discussed.

  1. Wire chamber

    DOEpatents

    Atac, Muzaffer

    1989-01-01

    A wire chamber or proportional counter device, such as Geiger-Mueller tube or drift chamber, improved with a gas mixture providing a stable drift velocity while eliminating wire aging caused by prior art gas mixtures. The new gas mixture is comprised of equal parts argon and ethane gas and having approximately 0.25% isopropyl alcohol vapor.

  2. Residential Wiring.

    ERIC Educational Resources Information Center

    Taylor, Mark

    The second in a series of three curriculum packages on wiring, these materials for a five-unit course were developed to prepare postsecondary students for entry-level employment in the residential wiring trade. The five units are: (1) blueprint reading and load calculations; (2) rough-in; (3) service; (4) trim out and troubleshooting; and (5) load…

  3. Overhead-Aware-Best-Fit (OABF) Resource Allocation Algorithm for Minimizing VM Launching Overhead

    SciTech Connect

    Wu, Hao; Garzoglio, Gabriele; Ren, Shangping; Timm, Steven; Noh, Seo Young

    2014-11-11

    FermiCloud is a private cloud developed in Fermi National Accelerator Laboratory to provide elastic and on-demand resources for different scientific research experiments. The design goal of the FermiCloud is to automatically allocate resources for different scientific applications so that the QoS required by these applications is met and the operational cost of the FermiCloud is minimized. Our earlier research shows that VM launching overhead has large variations. If such variations are not taken into consideration when making resource allocation decisions, it may lead to poor performance and resource waste. In this paper, we show how we may use an VM launching overhead reference model to minimize VM launching overhead. In particular, we first present a training algorithm that automatically tunes a given refer- ence model to accurately reflect FermiCloud environment. Based on the tuned reference model for virtual machine launching overhead, we develop an overhead-aware-best-fit resource allocation algorithm that decides where and when to allocate resources so that the average virtual machine launching overhead is minimized. The experimental results indicate that the developed overhead-aware-best-fit resource allocation algorithm can significantly improved the VM launching time when large number of VMs are simultaneously launched.

  4. 30 CFR 56.12045 - Overhead powerlines.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Overhead powerlines. 56.12045 Section 56.12045 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity §...

  5. 30 CFR 56.12045 - Overhead powerlines.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Overhead powerlines. 56.12045 Section 56.12045 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity §...

  6. 30 CFR 56.12045 - Overhead powerlines.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Overhead powerlines. 56.12045 Section 56.12045 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity §...

  7. 30 CFR 56.12045 - Overhead powerlines.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Overhead powerlines. 56.12045 Section 56.12045 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity §...

  8. 30 CFR 56.12045 - Overhead powerlines.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Overhead powerlines. 56.12045 Section 56.12045 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity §...

  9. The Overhead Projector in the Mathematics Classroom.

    ERIC Educational Resources Information Center

    Lenchner, George

    The first section of this pamphlet illustrates and describes the overhead projector, and discusses several of its advantages over other projection devises, including its simplicity of operation, conservation of class time, dynamic effects, image size, etc. The second section describes in some detail materials and methods used to make visuals, then…

  10. 29 CFR 1926.955 - Overhead lines.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Power Transmission and Distribution § 1926.955 Overhead... event of high wind or other adverse weather conditions which would make the work hazardous. (v... procedures, work from structures shall be discontinued when adverse weather (such as high wind or ice...

  11. 29 CFR 1926.955 - Overhead lines.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Power Transmission and Distribution § 1926.955 Overhead... event of high wind or other adverse weather conditions which would make the work hazardous. (v... procedures, work from structures shall be discontinued when adverse weather (such as high wind or ice...

  12. Viewing Vertical Objects with an Overhead Projector.

    ERIC Educational Resources Information Center

    Wild, R. L.

    1988-01-01

    Discusses the use of an overhead projector for the deflection of a vertical image to a screen. Describes three demonstrations: magnetizing of a steel ball bearing and paper clip; convection currents of a hot liquid within a cold liquid; and oscillation of concentrated salt solution into fresh water. (YP)

  13. The Overhead Projector in the Mathematics Classroom.

    ERIC Educational Resources Information Center

    Lenchner, George

    The first section of this pamphlet illustrates and describes the overhead projector, and discusses several of its advantages over other projection devises, including its simplicity of operation, conservation of class time, dynamic effects, image size, etc. The second section describes in some detail materials and methods used to make visuals, then…

  14. Centripetal Force on an Overhead Projector.

    ERIC Educational Resources Information Center

    Rheam, Harry

    1995-01-01

    Describes two simple demonstrations of an object moving in a straight line tangent to the circle if centripetal force is removed. Demonstrations use a pie plate and petri dish with ball bearings to illustrate the phenomena on an overhead projector. (LZ)

  15. Viewing Vertical Objects with an Overhead Projector.

    ERIC Educational Resources Information Center

    Wild, R. L.

    1988-01-01

    Discusses the use of an overhead projector for the deflection of a vertical image to a screen. Describes three demonstrations: magnetizing of a steel ball bearing and paper clip; convection currents of a hot liquid within a cold liquid; and oscillation of concentrated salt solution into fresh water. (YP)

  16. Centripetal Force on an Overhead Projector.

    ERIC Educational Resources Information Center

    Rheam, Harry

    1995-01-01

    Describes two simple demonstrations of an object moving in a straight line tangent to the circle if centripetal force is removed. Demonstrations use a pie plate and petri dish with ball bearings to illustrate the phenomena on an overhead projector. (LZ)

  17. Overhead Projection Cell for Streamline Flow

    ERIC Educational Resources Information Center

    Waage, Harold M.

    1969-01-01

    Describes the construction and operation of an overhead projection apparatus designed to demonstrate streamline flow of a liquid. The apparatus consists of a Plexiglass tank containing water in which plates forming the cell are submerged, a constant level reservoir, an overflow device and a system for marking the flow lines with a dye. (LC)

  18. Wire insulation defect detector

    NASA Technical Reports Server (NTRS)

    Greulich, Owen R. (Inventor)

    2004-01-01

    Wiring defects are located by detecting a reflected signal that is developed when an arc occurs through the defect to a nearby ground. The time between the generation of the signal and the return of the reflected signal provides an indication of the distance of the arc (and therefore the defect) from the signal source. To ensure arcing, a signal is repeated at gradually increasing voltages while the wire being tested and a nearby ground are immersed in a conductive medium. In order to ensure that the arcing occurs at an identifiable time, the signal whose reflection is to be detected is always made to reach the highest potential yet seen by the system.

  19. Wire Wise.

    ERIC Educational Resources Information Center

    Swanquist, Barry

    1998-01-01

    Discusses how today's technology is encouraging schools to invest in furnishings that are adaptable to computer use and telecommunications access. Explores issues concerning modularity, wiring management, ergonomics, durability, price, and aesthetics. (GR)

  20. Wire Wise.

    ERIC Educational Resources Information Center

    Swanquist, Barry

    1998-01-01

    Discusses how today's technology is encouraging schools to invest in furnishings that are adaptable to computer use and telecommunications access. Explores issues concerning modularity, wiring management, ergonomics, durability, price, and aesthetics. (GR)

  1. Ground and flight test experience with a triple redundant digital fly by wire control system. [installed in F-8C aircraft

    NASA Technical Reports Server (NTRS)

    Jarvis, C. R.; Szalai, K. J.

    1981-01-01

    A triplex digital fly by wire flight control system was developed and installed in an F-8C aircraft to provide fail operative, full authority control. Hardware and software redundancy management techniques were designed to detect and identify failures in the system. Control functions typical of those projected for future actively controlled vehicles were implemented.

  2. Brake-By-Wire Program

    DTIC Science & Technology

    2006-05-31

    SUPPLEMENTARY NOTES Report contains color. 14. ABSTRACT Two design iterations for electric calipers and two systems (full brake by wire and hybrid brakes ...were developed for use on a ground vehicle. The program demonstrated a fully integrated electric caliper and full brake -by-wire system on a sports...release. Project Context The development of an electric brake caliper and associated systems for automotive application represented a significant

  3. 29 CFR 1926.1438 - Overhead & gantry cranes.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 8 2013-07-01 2013-07-01 false Overhead & gantry cranes. 1926.1438 Section 1926.1438 Labor... (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes and Derricks in Construction § 1926.1438 Overhead & gantry cranes. (a) Permanently installed overhead and gantry cranes. The requirements of § 1910...

  4. 30 CFR 56.16014 - Operator-carrying overhead cranes.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Operator-carrying overhead cranes. 56.16014 Section 56.16014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Storage and Handling § 56.16014 Operator-carrying overhead cranes. Operator-carrying overhead cranes shall...

  5. 30 CFR 56.16014 - Operator-carrying overhead cranes.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Operator-carrying overhead cranes. 56.16014 Section 56.16014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Storage and Handling § 56.16014 Operator-carrying overhead cranes. Operator-carrying overhead cranes shall...

  6. 29 CFR 1926.1438 - Overhead & gantry cranes.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 8 2014-07-01 2014-07-01 false Overhead & gantry cranes. 1926.1438 Section 1926.1438 Labor... (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes and Derricks in Construction § 1926.1438 Overhead & gantry cranes. (a) Permanently installed overhead and gantry cranes. The requirements of § 1910...

  7. 30 CFR 57.16014 - Operator-carrying overhead cranes.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Operator-carrying overhead cranes. 57.16014 Section 57.16014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Storage and Handling § 57.16014 Operator-carrying overhead cranes. Operator-carrying overhead cranes shall...

  8. 30 CFR 57.16014 - Operator-carrying overhead cranes.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Operator-carrying overhead cranes. 57.16014 Section 57.16014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Storage and Handling § 57.16014 Operator-carrying overhead cranes. Operator-carrying overhead cranes shall...

  9. 30 CFR 57.16014 - Operator-carrying overhead cranes.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Operator-carrying overhead cranes. 57.16014 Section 57.16014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Storage and Handling § 57.16014 Operator-carrying overhead cranes. Operator-carrying overhead cranes shall...

  10. 30 CFR 57.16014 - Operator-carrying overhead cranes.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Operator-carrying overhead cranes. 57.16014 Section 57.16014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Storage and Handling § 57.16014 Operator-carrying overhead cranes. Operator-carrying overhead cranes shall...

  11. 30 CFR 56.16014 - Operator-carrying overhead cranes.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Operator-carrying overhead cranes. 56.16014 Section 56.16014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Storage and Handling § 56.16014 Operator-carrying overhead cranes. Operator-carrying overhead cranes shall...

  12. 30 CFR 57.16014 - Operator-carrying overhead cranes.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Operator-carrying overhead cranes. 57.16014 Section 57.16014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Storage and Handling § 57.16014 Operator-carrying overhead cranes. Operator-carrying overhead cranes shall...

  13. 29 CFR 1926.1438 - Overhead & gantry cranes.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 8 2012-07-01 2012-07-01 false Overhead & gantry cranes. 1926.1438 Section 1926.1438 Labor... (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes and Derricks in Construction § 1926.1438 Overhead & gantry cranes. (a) Permanently installed overhead and gantry cranes. The requirements of § 1910...

  14. 30 CFR 56.16014 - Operator-carrying overhead cranes.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Operator-carrying overhead cranes. 56.16014 Section 56.16014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Storage and Handling § 56.16014 Operator-carrying overhead cranes. Operator-carrying overhead cranes shall...

  15. 30 CFR 56.16014 - Operator-carrying overhead cranes.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Operator-carrying overhead cranes. 56.16014 Section 56.16014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Storage and Handling § 56.16014 Operator-carrying overhead cranes. Operator-carrying overhead cranes shall...

  16. 19 CFR 24.21 - Administrative overhead charges.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... THE TREASURY CUSTOMS FINANCIAL AND ACCOUNTING PROCEDURE § 24.21 Administrative overhead charges. (a) Reimbursable and overtime services. An additional charge for administrative overhead costs shall be collected....17 and 24.16, respectively, of this part. The cost of the charge for administrative overhead shall be...

  17. 23 CFR 140.907 - Overhead and indirect construction costs.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... which assure proper control and distribution of the overhead and indirect construction costs. ... 23 Highways 1 2012-04-01 2012-04-01 false Overhead and indirect construction costs. 140.907... REIMBURSEMENT Reimbursement for Railroad Work § 140.907 Overhead and indirect construction costs. (a) A...

  18. 30 CFR 56.14108 - Overhead drive belts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Overhead drive belts. 56.14108 Section 56.14108 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Safety Devices and Maintenance Requirements § 56.14108 Overhead drive belts. Overhead drive belts...

  19. 30 CFR 57.14108 - Overhead drive belts.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Overhead drive belts. 57.14108 Section 57.14108 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Equipment Safety Devices and Maintenance Requirements § 57.14108 Overhead drive belts. Overhead drive...

  20. 30 CFR 56.14108 - Overhead drive belts.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Overhead drive belts. 56.14108 Section 56.14108 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Safety Devices and Maintenance Requirements § 56.14108 Overhead drive belts. Overhead drive belts...

  1. 30 CFR 56.14108 - Overhead drive belts.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Overhead drive belts. 56.14108 Section 56.14108 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Safety Devices and Maintenance Requirements § 56.14108 Overhead drive belts. Overhead drive belts...

  2. 30 CFR 57.14108 - Overhead drive belts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Overhead drive belts. 57.14108 Section 57.14108 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Equipment Safety Devices and Maintenance Requirements § 57.14108 Overhead drive belts. Overhead drive...

  3. 30 CFR 56.14108 - Overhead drive belts.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Overhead drive belts. 56.14108 Section 56.14108 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Safety Devices and Maintenance Requirements § 56.14108 Overhead drive belts. Overhead drive belts...

  4. 30 CFR 57.14108 - Overhead drive belts.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Overhead drive belts. 57.14108 Section 57.14108 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Equipment Safety Devices and Maintenance Requirements § 57.14108 Overhead drive belts. Overhead drive...

  5. 30 CFR 57.14108 - Overhead drive belts.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Overhead drive belts. 57.14108 Section 57.14108 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Equipment Safety Devices and Maintenance Requirements § 57.14108 Overhead drive belts. Overhead drive...

  6. 30 CFR 57.14108 - Overhead drive belts.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Overhead drive belts. 57.14108 Section 57.14108 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Equipment Safety Devices and Maintenance Requirements § 57.14108 Overhead drive belts. Overhead drive...

  7. 30 CFR 56.14108 - Overhead drive belts.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Overhead drive belts. 56.14108 Section 56.14108 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Safety Devices and Maintenance Requirements § 56.14108 Overhead drive belts. Overhead drive belts...

  8. Wiring design for the control of electromagnetic interference (EMI)

    NASA Technical Reports Server (NTRS)

    Kopasakis, George

    1995-01-01

    Wiring design is only one important aspect of EMI control. Other important areas for EMI are: circuit design, filtering, grounding, bonding, shielding, lighting, electrostatic discharge (ESD), transient suppression, and electromagnetic pulse (EMP). Topics covered include: wire magnetic field emissions at low frequencies; wire radiated magnetic field emissions at frequencies; wire design guidelines for EMI control; wire design guidelines for EMI control; high frequency emissions from cables; and pulse frequency spectra.

  9. A new method for overhead drilling.

    PubMed

    Rempel, David; Star, Demetra; Barr, Alan; Gibbons, Billy; Janowitz, Ira

    2009-12-01

    In the construction sector, overhead drilling into concrete or metal ceilings is a strenuous task associated with shoulder, neck and back musculoskeletal disorders due to the large applied forces and awkward arm postures. Two intervention devices, an inverted drill press and a foot lever design, were developed then compared to the usual method by construction workers performing their normal overhead drilling activities (n = 14). While the intervention devices were rated as less fatiguing than the usual method, their ratings on usability measures were worse than the usual method. The study demonstrates that the intervention devices can reduce fatigue; however, additional modifications are necessary in order to improve usability and productivity. Devices designed to improve workplace safety may need to undergo several rounds of field testing and modification prior to implementation.

  10. 24 CFR 3280.809 - Grounding.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... shall be grounded through the green-colored conductor in the supply cord or the feeder wiring to the... grounding means. (1) The green-colored grounding wire in the supply cord or permanent feeder wiring shall be... metallic roof and exterior covering shall be considered bonded if (i) the metal panels overlap one another...

  11. Shoulder Injuries in the Overhead Throwing Athlete.

    PubMed

    Mlynarek, Ryan A; Lee, Simon; Bedi, Asheesh

    2017-02-01

    The overhead pitching motion is a coordinated sequence of movements that subjects the shoulder to extreme forces. The ultimate goal of this complex, dynamic activity is to generate high ball velocity and accuracy. In doing so, repetitive throwing can cause adaptive and pathologic changes in the thrower's shoulder. This article reviews the relevant shoulder anatomy, the kinetic chain, and throwing mechanics, as well as common shoulder injuries and surgical options for the treating orthopedic surgeon.

  12. Human Factors Engineering Guidelines for Overhead Cranes

    NASA Technical Reports Server (NTRS)

    Chandler, Faith; Delgado, H. (Technical Monitor)

    2001-01-01

    This guideline provides standards for overhead crane cabs that can be applied to the design and modification of crane cabs to reduce the potential for human error due to design. This guideline serves as an aid during the development of a specification for purchases of cranes or for an engineering support request for crane design modification. It aids human factors engineers in evaluating existing cranes during accident investigations or safety reviews.

  13. Wire recycling for quantum circuit optimization

    NASA Astrophysics Data System (ADS)

    Paler, Alexandru; Wille, Robert; Devitt, Simon J.

    2016-10-01

    Quantum information processing is expressed using quantum bits (qubits) and quantum gates which are arranged in terms of quantum circuits. Here, each qubit is associated with a quantum circuit wire which is used to conduct the desired operations. Most of the existing quantum circuits allocate a single quantum circuit wire for each qubit and hence introduce significant overhead. In fact, qubits are usually not needed during the entire computation, only between their initialization and measurement. Before and after that, corresponding wires may be used by other qubits. In this work, we propose a solution which exploits this fact in order to optimize the design of quantum circuits with respect to the required wires. To this end, we introduce a representation of the lifetimes of all qubits which is used to analyze the respective need for wires. Based on this analysis, a method is proposed which "recycles" the available wires and, as a result, reduces the size of the resulting circuit. Numerical tests based on established reversible and fault-tolerant quantum circuits confirm that the proposed solution reduces the number of wires by more than 90% compared to unoptimized quantum circuits.

  14. 29 CFR 1910.304 - Wiring design and protection.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... single-phase, three-wire system shall be grounded; (iii) The common conductor of a multiphase system having one wire common to all phases shall be grounded; (iv) One phase conductor of a multiphase system... grounded cold water pipe near the equipment if the extension was installed before August 13, 2007. When any...

  15. 29 CFR 1910.304 - Wiring design and protection.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... single-phase, three-wire system shall be grounded; (iii) The common conductor of a multiphase system having one wire common to all phases shall be grounded; (iv) One phase conductor of a multiphase system... grounded cold water pipe near the equipment if the extension was installed before August 13, 2007. When any...

  16. 29 CFR 1910.304 - Wiring design and protection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... single-phase, three-wire system shall be grounded; (iii) The common conductor of a multiphase system having one wire common to all phases shall be grounded; (iv) One phase conductor of a multiphase system... grounded cold water pipe near the equipment if the extension was installed before August 13, 2007. When any...

  17. No Wires.

    ERIC Educational Resources Information Center

    DeLoughry, Thomas J.

    1995-01-01

    The University of California at Santa Cruz has completed a successful test of a wireless computer network that would enable students and professors to get on line from anywhere on campus. The network, linked by radio waves, could save millions of dollars in campus wiring costs and would better meet student and faculty information needs. (MSE)

  18. No Wires.

    ERIC Educational Resources Information Center

    DeLoughry, Thomas J.

    1995-01-01

    The University of California at Santa Cruz has completed a successful test of a wireless computer network that would enable students and professors to get on line from anywhere on campus. The network, linked by radio waves, could save millions of dollars in campus wiring costs and would better meet student and faculty information needs. (MSE)

  19. Claims for Unabsorbed Overhead on Defense Contracts.

    DTIC Science & Technology

    1985-09-01

    increase overhead costs" (7:20). In a concurring opinion, Administrative Judge Lieblich makes a couple of points very clear: (1) as far as this Board is...method of calculating these coats C7:13. Judge Lieblich than goes on to qualify his seemingly strong words about the "Eichleay" formula. He states...BCA, 83-2: 1-32 and (1-2 of Concurring opinio-f Judge Lieblich ) (17 February 1983). 8. Capital Electric co. vs. The United States, No. 83-965, CAFC: 1

  20. Method of locating ground faults

    NASA Technical Reports Server (NTRS)

    Patterson, Richard L. (Inventor); Rose, Allen H. (Inventor); Cull, Ronald C. (Inventor)

    1994-01-01

    The present invention discloses a method of detecting and locating current imbalances such as ground faults in multiwire systems using the Faraday effect. As an example, for 2-wire or 3-wire (1 ground wire) electrical systems, light is transmitted along an optical path which is exposed to magnetic fields produced by currents flowing in the hot and neutral wires. The rotations produced by these two magnetic fields cancel each other, therefore light on the optical path does not read the effect of either. However, when a ground fault occurs, the optical path is exposed to a net Faraday effect rotation due to the current imbalance thereby exposing the ground fault.

  1. Method of locating ground faults

    NASA Astrophysics Data System (ADS)

    Patterson, Richard L.; Rose, Allen H.; Cull, Ronald C.

    1994-11-01

    The present invention discloses a method of detecting and locating current imbalances such as ground faults in multiwire systems using the Faraday effect. As an example, for 2-wire or 3-wire (1 ground wire) electrical systems, light is transmitted along an optical path which is exposed to magnetic fields produced by currents flowing in the hot and neutral wires. The rotations produced by these two magnetic fields cancel each other, therefore light on the optical path does not read the effect of either. However, when a ground fault occurs, the optical path is exposed to a net Faraday effect rotation due to the current imbalance thereby exposing the ground fault.

  2. Electrical and mechanical design criteria for EHV and UHV: overhead transmission lines

    SciTech Connect

    Not Available

    1980-06-01

    The results are presented of a program devoted to the selection of electrical and mechanical design criteria and parameters for overhead power transmission lines for ac systems rated at from 345 to 1100 kV and for dc systems rated at from 600 to 1200 kV. Information is included on the environmental effects, i.e., audible noise and electric fields, of the lines, mechanical and economic requirements, safety, failures, grounding, and lightning protection. (LCL)

  3. Add-On Shielding for Unshielded Wire

    NASA Technical Reports Server (NTRS)

    Koenig, J. C.; Billitti, J. W.; Tallon, J. M.

    1983-01-01

    Fabrication sequence used to produce compact shields slipped into place from free ends of wires already soldered into connectors at other ends. Single shields are formed into harnesses by connecting grounding jumpers. Technique is especially useful for small diameter wire attached to microminiature connectors.

  4. Tribologic analyses of a self-mated aluminium contact used for overhead transmission lines

    NASA Astrophysics Data System (ADS)

    Steier, V. Franco

    2017-05-01

    The lifetime of aluminium components is often limited to their poor wear resistance. One example for such aluminium applications are overhead transmission lines. The sore points of these lines are the segments where the aluminium conductors are fixed to the line supports. The fixation is commonly realized via aluminium suspension clamps. Here, a superposition of different loads like traction and bending stresses, clamping forces and different types of wear occurs. To investigate the wear behaviour in these peculiar points, tribologic model tests were carried out. Within the tests, overhead conductor wires and aluminium plates, extracted from suspension clamps were reciprocally slid against aluminium plates (cylinder-on-plate test). The COF and a wear related parameter were recorded constantly. Subsequently, the loaded surfaces were analysed using confocal laser and electron scanning microscopy as well as energy dispersive X-ray spectroscopy. The investigation detected the formation of an oxidized tribologic layer between both components. The tribolayer, which mayor part adhered on the suspension clamps, was mostly formed from material removed from the conductor wires.

  5. Shoulder Pain in the Overhead Throwing Athlete

    PubMed Central

    Seroyer, Shane T.; Nho, Shane J.; Bach, Bernard R.; Bush-Joseph, Charles A.; Nicholson, Gregory P.; Romeo, Anthony A.

    2009-01-01

    Treatment of the overhead throwing athlete is among the more challenging aspects of orthopaedic sports medicine. Awareness and understanding of the throwing motion and the supraphysiologic forces to which the structures of the shoulder are subjected are essential to diagnosis and treatment. Pain and dysfunction in the throwing shoulder may be attributed to numerous etiologies, including scapular dysfunction, intrinsic glenohumeral pathology (capsulolabral structures), extrinsic musculature (rotator cuff), or neurovascular structures. Attention to throwing mechanics and appropriate stretching, strength, and conditioning programs may reduce the risk of injury in this highly demanding activity. Early discovery of symptoms, followed by conservative management with rest and rehabilitation with special attention to retraining mechanics may mitigate the need for surgical intervention. Prevention of injury is always more beneficial to the long-term health of the thrower than is surgical repair. An anatomic approach is used in this report, focusing on common etiologies of pain in the overhead thrower and emphasizing the clinical presentation and treatment. PMID:23015861

  6. Troubleshooting crude vacuum tower overhead ejector systems

    SciTech Connect

    Lines, J.R.; Frens, L.L. )

    1995-03-01

    Routinely surveying tower overhead vacuum systems can improve performance and product quality. These vacuum systems normally provide reliable and consistent operation. However, process conditions, supplied utilities, corrosion, erosion and fouling all have an impact on ejector system performance. Refinery vacuum distillation towers use ejector systems to maintain tower top pressure and remove overhead gases. However, as with virtually all refinery equipment, performance may be affected by a number of variables. These variables may act independently or concurrently. It is important to understand basic operating principles of vacuum systems and how performance is affected by: utilities, corrosion and erosion, fouling, and process conditions. Reputable vacuum-system suppliers have service engineers that will come to a refinery to survey the system and troubleshoot performance or offer suggestions for improvement. A skilled vacuum-system engineer may be needed to diagnose and remedy system problems. The affect of these variables on performance is discussed. A case history is described of a vacuum system on a crude tower in a South American refinery.

  7. Overhead analysis of universal concatenated quantum codes

    NASA Astrophysics Data System (ADS)

    Chamberland, Christopher; Jochym-O'Connor, Tomas; Laflamme, Raymond

    2017-02-01

    We analyze the resource overhead of recently proposed methods for universal fault-tolerant quantum computation using concatenated codes. Namely, we examine the concatenation of the 7-qubit Steane code with the 15-qubit Reed-Muller code, which allows for the construction of the 49- and 105-qubit codes that do not require the need for magic state distillation for universality. We compute a lower bound for the adversarial noise threshold of the 105-qubit code and find it to be 8.33 ×10-6. We obtain a depolarizing noise threshold for the 49-qubit code of 9.69 ×10-4 which is competitive with the 105-qubit threshold result of 1.28 ×10-3 . We then provide lower bounds on the resource requirements of the 49- and 105-qubit codes and compare them with the surface code implementation of a logical T gate using magic state distillation. For the sampled input error rates and noise model, we find that the surface code achieves a smaller overhead compared to our concatenated schemes.

  8. Mechanics and pathomechanics in the overhead athlete.

    PubMed

    Kibler, W Ben; Wilkes, Trevor; Sciascia, Aaron

    2013-10-01

    Optimal performance of the overhead throwing task requires precise mechanics that involve coordinated kinetic and kinematic chains to develop, transfer, and regulate the forces the body needs to withstand the inherent demands of the task and to allow optimal performance. These chains have been evaluated and the basic components, called nodes, have been identified. Impaired performance and/or injury, the DTS, is associated with alterations in the mechanics that are called pathomechanics. They can occur at multiple locations throughout the kinetic chain. They must be evaluated and treated as part of the overall problem. Observational analysis of the mechanics and pathomechanics using the node analysis method can be useful in highlighting areas of alteration that can be evaluated for anatomic injury or altered physiology. The comprehensive kinetic chain examination can evaluate sites of kinetic chain breakage, and a detailed shoulder examination can assess joint internal derangement of altered physiology that may contribute to the pathomechanics. Treatment of the DTS should be comprehensive, directed toward restoring physiology and mechanics and optimizing anatomy. This maximizes the body’s ability to develop normal mechanics to accomplish the overhead throwing task.

  9. 23. OVERALL OVERHEAD VIEW OF MARISCAL WORKS LOOKING NORTH, NORTHEAST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. OVERALL OVERHEAD VIEW OF MARISCAL WORKS LOOKING NORTH, NORTHEAST. NOTICE REDWOOD TANK PLATFORM LOWER RIGHT FOREGROUND. - Mariscal Quicksilver Mine & Reduction Works, Terlingua, Brewster County, TX

  10. 19. DETAIL, OVERHEAD CATWALK Delaware, Lackawanna & Western Railroad ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. DETAIL, OVERHEAD CATWALK - Delaware, Lackawanna & Western Railroad Freight & Rail Yard, Multiple Unit Light Inspection Shed, New Jersey Transit Hoboken Terminal Rail Yard, Hoboken, Hudson County, NJ

  11. Precision wire feeder for small diameter wire

    DOEpatents

    Brandon, Eldon D.; Hooper, Frederick M.; Reichenbach, Marvin L.

    1992-01-01

    A device for feeding small diameter wire having a diameter less than 0.04 mm (16 mil) to a welding station includes a driving wheel for controllably applying a non-deforming driving force to the wire to move the free end of the wire towards the welding station; and a tension device such as a torque motor for constantly applying a reverse force to the wire in opposition to the driving force to keep the wire taut.

  12. Precision wire feeder for small diameter wire

    DOEpatents

    Brandon, E.D.; Hooper, F.M.; Reichenbach, M.L.

    1992-08-11

    A device for feeding small diameter wire having a diameter less than 0.04 mm (16 mil) to a welding station includes a driving wheel for controllably applying a non-deforming driving force to the wire to move the free end of the wire towards the welding station; and a tension device such as a torque motor for constantly applying a reverse force to the wire in opposition to the driving force to keep the wire taut. 1 figure.

  13. Reducing space overhead for independendent checkpointing

    NASA Technical Reports Server (NTRS)

    Wang, Yi-Min; Chung, Pi-Yu; Lin, In-Jen; Fuchs, W. Kent

    1992-01-01

    The main disadvantages of independent checkpointing are the possible domino effect and the associated storage space overhead for maintaining multiple checkpoints. In most previous work, it has been assumed that only the checkpoints older than the current global recovery line can be discarded. Here, we generalize a notion of recovery line to potential recovery line. Only the checkpoints belonging to at least one of the potential recovery lines cannot be discarded. By using the model of maximum-sized antichains on a partially ordered set, an efficient algorithm is developed for finding all non-discardable checkpoints, and we show that the number of non-discardable checkpoints cannot exceed N(N+1)/2, where N is the number of processors. Communication trace driven simulation for several hypercube programs is performed to show the benefit of the proposed algorithm for real applications.

  14. Low-overhead accrual failure detector.

    PubMed

    Ren, Xiao; Dong, Jian; Liu, Hongwei; Li, Yang; Yang, Xiaozong

    2012-01-01

    Failure detectors are one of the fundamental components for building a distributed system with high availability. In order to maintain the efficiency and scalability of failure detection in a complicated large-scale distributed system, accrual failure detectors that can adapt to multiple applications have been studied extensively. In this paper, an new accrual failure detector--LA-FD with low system overhead has been proposed specifically for current mobile network equipment on the Internet whose processing power, memory space and power supply are all constrained. It does not rely on the probability distribution of message transmission time, or on the maintenance of a history message window. By simple calculation, LA-FD provides adaptive failure detection service with high accuracy to multiple upper applications. The related experiments and results have also been presented.

  15. Physical examination of the overhead athlete's shoulder.

    PubMed

    Sewick, Amy; Kelly, John D; Rubin, Ben

    2012-03-01

    Overhead athletes seek the services of an orthopedic surgeon because of pain and/or dysfunction. It is important to address the cause of the symptoms more so than the source of the patient's pain, so that treatment will eliminate the problem rather than merely ameliorate symptoms temporarily. In order to accomplish a thorough assessment of shoulder function, the examiner must expand his/her view from isolated assessment of the glenohumeral joint range of motion, stability, assessment of rotator cuff strength, palpation and provocative maneuvers, and add assessment of the shoulder in the context of the kinetic chain. The examination of the thrower's shoulder, coupled with a thorough history, will usually provide a solid functional diagnosis and provide a good idea as to the presence of structural damage. As a result, the value of rehabilitation and the benefit of surgical intervention are made more predictable.

  16. NIOSH alert: Request for assistance in preventing electrocutions of crane operators and crew members working near overhead power lines

    SciTech Connect

    1995-05-01

    In this alert, NIOSH warned that crane operators and crew members may be electrocuted when working near overhead power lines. Five cases were described which resulted in six electrocutions. Case 1 involved a 29 year old who pushed the crane cable on a 1 yard cement bucket into a 7,200 volt power line. Case 2 involved a 33 year old well driller who was electrocuted when a metal pipe lifted by a truck mounted crane contacted a 12,000 volt overhead power line. The third case involved a 24 year old forman for a telecommunications company who was electrocuted when he grabbed the door handle of a truck mounted crane whose boom was in contact with a 7,200 volt overhead power line. Case 4 involved a 37 year old construction laborer electrocuted while pulling a wire rope attached to a crane cable toward a load. The fifth case involved a 20 year old male truck driver and his 70 year old male employer who were electrocuted when the boom of a truck mounted crane contacted a 7,200 volt conductor of an overhead power line.

  17. Geography via the Overhead Projector: Do It This Way, 7.

    ERIC Educational Resources Information Center

    Best, Thomas D.

    This booklet is designed to assist teachers in their use of overhead projectors when teaching geography. With the overhead technique, relationships among patterns can be suggested bit by bit on inexpensive, easily prepared overlays that are projected to sizes appropriate for a particular instructional situation. A general discussion of the…

  18. 1. EAST SIDE OF OVERHEAD BOMB TRANSPORT RACK, WITH BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. EAST SIDE OF OVERHEAD BOMB TRANSPORT RACK, WITH BUILDING 343 AT LEFT AND BUILDING 328 AT RIGHT. VIEW TO WEST. - Rocky Mountain Arsenal, Overhead Bomb Transport Rack, 1580 feet South of December Seventh Avenue; 860 feet West of D Street, Commerce City, Adams County, CO

  19. 78 FR 77027 - Overhead Clearance (Air-Draft) Accidents

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-20

    ... SECURITY Coast Guard 33 CFR Parts 117, 161, and 164 46 CFR Part 4 Overhead Clearance (Air-Draft) Accidents... address the problem of overhead clearance (air-draft) accidents. In its petition, which calls for vessel masters to be provided with accurate vertical air draft information, a maritime organization has...

  20. Non-contact measurement of contact wire

    NASA Astrophysics Data System (ADS)

    Yi, Yaxing; Ye, Xuemei; Li, Zhongke; Yue, Kaiduan

    2008-12-01

    The overhead contact system is the power supply unit of the electric locomotive. This article is to introduce our newly developed method to measure the height and pull out value of the contact wire. A carema dolly which can move on railway is applied to bear the weight of the measure equipment; two linear CCD cameras are installed on the dolly symmetrically about the midline of two rails. While the dolly move along the railway, two CCD cameras grasp the image synchronously, and a computer real-time process the images, the height and pull out value can be calculate out from the images.

  1. Wire Retrieves Broken Pin

    NASA Technical Reports Server (NTRS)

    Burow, G. H.

    1984-01-01

    Safety wire retains pieces of broken tool. Retrieval wire running through shaft of tool used to pull pieces of tool out of hole, should tool break during use. Safety wire concept suitable for pins subject to deflection or breakage.

  2. Automated wire preparation system

    NASA Astrophysics Data System (ADS)

    McCulley, Deborah J.

    The first step toward an automated wire harness facility for the aerospace industry has been taken by implementing the Wire Vektor 2000 into the wire harness preparation area. An overview of the Wire Vektor 2000 is given, including the facilities for wire cutting, marking, and transporting, for wire end processing, and for system control. Production integration in the Wire Vektor 2000 system is addressed, considering the hardware/software debug system and the system throughput. The manufacturing changes that have to be made in implementing the Wire Vektor 2000 are discussed.

  3. Correlated atomic wires on substrates. II. Application to Hubbard wires

    NASA Astrophysics Data System (ADS)

    Abdelwahab, Anas; Jeckelmann, Eric; Hohenadler, Martin

    2017-07-01

    In the first part of our theoretical study of correlated atomic wires on substrates, we introduced lattice models for a one-dimensional quantum wire on a three-dimensional substrate and their approximation by quasi-one-dimensional effective ladder models [Abdelwahab et al., preceding paper, Phys. Rev. B 96, 035445 (2017), 10.1103/PhysRevB.96.035445]. In this second part, we apply this approach to the case of a correlated wire with a Hubbard-type electron-electron repulsion deposited on an insulating substrate. The ground-state and spectral properties are investigated numerically using the density-matrix renormalization group method and quantum Monte Carlo simulations. As a function of the model parameters, we observe various phases with quasi-one-dimensional low-energy excitations localized in the wire, namely, paramagnetic Mott insulators, Luttinger liquids, and spin-1 /2 Heisenberg chains. The validity of the effective ladder models is assessed for selected parameters by studying the dependence of results on the number of legs and comparing to the full three-dimensional model. We find that narrow ladder models accurately reproduce the quasi-one-dimensional excitations of the full three-dimensional model but predict only qualitatively whether excitations are localized around the wire or delocalized in the three-dimensional substrate.

  4. Influence of electronic emission on wire initiation

    NASA Astrophysics Data System (ADS)

    Sarkisov, Gennady; Struve, Kenneth; Rosenthal, Stephen; Sasorov, Pavel

    2001-10-01

    Direct experimental evidence of influence of electronic emissions on energy deposition during electrical explosion of fine metal wires is presented. Set of electrical and optical diagnostics has been used to observe value and structure of deposited energy. Main experiment has been done with different polarity between wire and coaxial ground. For a positive polarity explosion, the radial electric field “pushes” electrons into the wire, and a “conical” growth of deposited energy to the anode has been observed. For a negative polarity explosion, the radial electric field “expels” electrons from the wire, and more energy is deposited on the cathode and anode ends, and less in the central part of the wire. In this case the absorbed energy drops 2 times below positive polarity explosion. Explosion of wires in air does not show any polarity effect. Energy deposition is the same and the wire expands homogeneously. This experiment gives convincing evidence of direct influence of electronic thermo-field emissions on a process of energy deposition into the wire. Influence of electronic emission on energy deposition becomes stronger with decreasing dI/dt. The structure of the radial electric field surrounding the wire has been simulated using 2D electrostatic code. The experimental result has been compared with 2D MHD simulations.

  5. Comparison of Analysis, Simulation, and Measurement of Wire-to-Wire Crosstalk. Part 1

    NASA Technical Reports Server (NTRS)

    Bradley, Arthur T.; Yavoich, Brian James; Hodson, Shame M.; Godley, Richard Franklin

    2010-01-01

    In this investigation, we compare crosstalk analysis, simulation, and measurement results for electrically short configurations. Methods include hand calculations, PSPICE simulations, Microstripes transient field solver, and empirical measurement. In total, four representative physical configurations are examined, including a single wire over a ground plane, a twisted pair over a ground plane, generator plus receptor wires inside a cylindrical conduit, and a single receptor wire inside a cylindrical conduit. Part 1 addresses the first two cases, and Part 2 addresses the final two. Agreement between the analysis, simulation, and test data is shown to be very good.

  6. Comparison of Analysis, Simulation, and Measurement of Wire-to-Wire Crosstalk. Part 2

    NASA Technical Reports Server (NTRS)

    Bradley, Arthur T.; Yavoich, Brian James; Hodson, Shane M.; Godley, Franklin

    2010-01-01

    In this investigation, we compare crosstalk analysis, simulation, and measurement results for electrically short configurations. Methods include hand calculations, PSPICE simulations, Microstripes transient field solver, and empirical measurement. In total, four representative physical configurations are examined, including a single wire over a ground plane, a twisted pair over a ground plane, generator plus receptor wires inside a cylindrical conduit, and a single receptor wire inside a cylindrical conduit. Part 1 addresses the first two cases, and Part 2 addresses the final two. Agreement between the analysis methods and test data is shown to be very good.

  7. 30 CFR 75.1003 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 75.1003 Section 75.1003... Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. Trolley wires, trolley feeder wires, and bare signal wires shall be insulated...

  8. Gasoline engine with single overhead camshaft having duel exhaust cams per cylinder wherein each exhaust cam has duel lobes

    SciTech Connect

    Taguma, K.

    1991-03-19

    This patent describes an improved gasoline engine using a spark plug and a spark plug wire. It comprises a cylinder having a cylinder wall and an upper end; a piston movably disposed within the cylinder; a gasoline injector for supplying the gasoline charge into the cylinder; a single tube exhaust valve movably mounted to the cylinder; a single overhead camshaft having duel exhaust came for the cylinder with each exhaust cam having duel exhaust lobes; and port holes contained in the cylinder around the cylinder wall in a ring-like fashion.

  9. Windows: Life after Wire.

    ERIC Educational Resources Information Center

    Razwick, Jerry

    2003-01-01

    Although wired glass is extremely common in school buildings, the International Building Code adopted new standards that eliminate the use of traditional wired glass in K-12 schools, daycare centers, and athletic facilities. Wired glass breaks easily, and the wires can cause significant injuries by forming dangerous snags when the glass breaks.…

  10. Windows: Life after Wire.

    ERIC Educational Resources Information Center

    Razwick, Jerry

    2003-01-01

    Although wired glass is extremely common in school buildings, the International Building Code adopted new standards that eliminate the use of traditional wired glass in K-12 schools, daycare centers, and athletic facilities. Wired glass breaks easily, and the wires can cause significant injuries by forming dangerous snags when the glass breaks.…

  11. Overhead View of Area Surrounding Pathfinder

    NASA Technical Reports Server (NTRS)

    1997-01-01

    Overhead view of the area surrounding the Pathfinder lander illustrating the Sojourner traverse. Red rectangles are rover positions at the end of sols 1-30. Locations of soil mechanics experiments, wheel abrasion experiments, and APXS measurements are shown. The A numbers refer to APXS measurements as discussed in the paper by Rieder et al. (p. 1770, Science Magazine, see image note). Coordinates are given in the LL frame.

    The photorealistic, interactive, three-dimensional virtual reality (VR) terrain models were created from IMP images using a software package developed for Pathfinder by C. Stoker et al. as a participating science project. By matching features in the left and right camera, an automated machine vision algorithm produced dense range maps of the nearfield, which were projected into a three-dimensional model as a connected polygonal mesh. Distance and angle measurements can be made on features viewed in the model using a mouse-driven three-dimensional cursor and a point-and-click interface. The VR model also incorporates graphical representations of the lander and rover and the sequence and spatial locations at which rover data were taken. As the rover moved, graphical models of the rover were added for each position that could be uniquely determined using stereo images of the rover taken by the IMP. Images taken by the rover were projected into the model as two-dimensional 'billboards' to show the proper perspective of these images.

    NOTE: original caption as published in Science Magazine

    Mars Pathfinder is the second in NASA's Discovery program of low-cost spacecraft with highly focused science goals. The Jet Propulsion Laboratory, Pasadena, CA, developed and manages the Mars Pathfinder mission for NASA's Office of Space Science, Washington, D.C. JPL is a division of the California Institute of Technology (Caltech).

  12. Overhead View of Area Surrounding Pathfinder

    NASA Technical Reports Server (NTRS)

    1997-01-01

    Overhead view of the area surrounding the Pathfinder lander illustrating the Sojourner traverse. Red rectangles are rover positions at the end of sols 1-30. Locations of soil mechanics experiments, wheel abrasion experiments, and APXS measurements are shown. The A numbers refer to APXS measurements as discussed in the paper by Rieder et al. (p. 1770, Science Magazine, see image note). Coordinates are given in the LL frame.

    The photorealistic, interactive, three-dimensional virtual reality (VR) terrain models were created from IMP images using a software package developed for Pathfinder by C. Stoker et al. as a participating science project. By matching features in the left and right camera, an automated machine vision algorithm produced dense range maps of the nearfield, which were projected into a three-dimensional model as a connected polygonal mesh. Distance and angle measurements can be made on features viewed in the model using a mouse-driven three-dimensional cursor and a point-and-click interface. The VR model also incorporates graphical representations of the lander and rover and the sequence and spatial locations at which rover data were taken. As the rover moved, graphical models of the rover were added for each position that could be uniquely determined using stereo images of the rover taken by the IMP. Images taken by the rover were projected into the model as two-dimensional 'billboards' to show the proper perspective of these images.

    NOTE: original caption as published in Science Magazine

    Mars Pathfinder is the second in NASA's Discovery program of low-cost spacecraft with highly focused science goals. The Jet Propulsion Laboratory, Pasadena, CA, developed and manages the Mars Pathfinder mission for NASA's Office of Space Science, Washington, D.C. JPL is a division of the California Institute of Technology (Caltech).

  13. 2. OVERHEAD CHEMICAL PROCESS PIPING BETWEEN BUILDINGS 422, ON RIGHT, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. OVERHEAD CHEMICAL PROCESS PIPING BETWEEN BUILDINGS 422, ON RIGHT, AND 431, ON LEFT. - Rocky Mountain Arsenal, Crude Mustard & Aldrin Manufacturing, 1200 feet South of December Seventh Avenue; 600 feet East of D Street, Commerce City, Adams County, CO

  14. Overhead Projector Demonstrations: Tilted TOPS: Inclined Plane Projection.

    ERIC Educational Resources Information Center

    Alyea, Hubert N.

    1989-01-01

    The construction and uses of a device to facilitate the use of an overhead projector to show chemical reactions is presented. Materials and instructions for construction as well as reactor vessels are discussed. (CW)

  15. Childhood cancer and overhead powerlines: a case-control study.

    PubMed Central

    Myers, A.; Clayden, A. D.; Cartwright, R. A.; Cartwright, S. C.

    1990-01-01

    A case-control study has been carried out to examine the occurrence of childhood cancer in relation to the proximity of overhead power lines to a child's home address at birth and to the calculated magnetic field at the address. The study included 374 cases diagnosed in the Yorkshire Health Region between 1970 and 1979, together with 588 matched controls. Magnetic-field strengths at the birth addresses due to the load currents of overhead power lines were calculated on the basis of line-network maps and load records. The results indicate no association between the occurrence of childhood malignancies and either the proximity or the magnetic fields of overhead lines, although the statistical power of the study was limited by the small numbers of children living close to overhead power lines. PMID:2257204

  16. New rain shed (Building No. 241), overhead pipeline and raw ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    New rain shed (Building No. 241), overhead pipeline and raw water tank T4. Distribution pump house can be seen at the center of building. - Hawaii Volcanoes National Park Water Collection System, Hawaii Volcanoes National Park, Volcano, Hawaii County, HI

  17. Overhead Projector Demonstrations: A Classroom Demonstration of Aliphatic Substitution.

    ERIC Educational Resources Information Center

    Perina, Ivo; Mihanovic, Branka

    1989-01-01

    Presents a halogen substitution of an alkane using a compartmentalized Petri dish or Conway dish on an overhead projector. Provides methodology and several modifications for different reactions. Uses hexane, methyl orange, bromine, and silver nitrate. (MVL)

  18. OVERHEAD VIEW OF VIVIANNA WORKS ORE BIN LOOKING NORTHEAST. GENERATOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    OVERHEAD VIEW OF VIVIANNA WORKS ORE BIN LOOKING NORTHEAST. GENERATOR BUILDING TOP LEFT, OFFICE AND STOREROOM TOP CENTER, ROTARY KILN AND CONDENSER PLATFORM RIGHT. - Mariscal Quicksilver Mine & Reduction Works, Terlingua, Brewster County, TX

  19. 24. OVERHEAD VIEW OF MARISCAL WORKS ORE BIN FOUNDATION AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. OVERHEAD VIEW OF MARISCAL WORKS ORE BIN FOUNDATION AND CONDENSERS, TOWARD WHERE ORE DELIVERY TRACK WOULD HAVE RUN, LOOKING NORTHEAST. - Mariscal Quicksilver Mine & Reduction Works, Terlingua, Brewster County, TX

  20. OVERHEAD VIEW OF MARISCAL WORKS ORE BIN FOUNDATION AND CONDENSERS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    OVERHEAD VIEW OF MARISCAL WORKS ORE BIN FOUNDATION AND CONDENSERS, TOWARD WHERE ORE DELIVERY TRACK WOULD HAVE RUN, LOOKING NORTHEAST. - Mariscal Quicksilver Mine & Reduction Works, Terlingua, Brewster County, TX

  1. 22. GENERAL OVERHEAD VIEW OF MARISCAL WORKS, SHOWING ORE BIN, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. GENERAL OVERHEAD VIEW OF MARISCAL WORKS, SHOWING ORE BIN, LEFT, CONDENSERS, CENTER, AND CIRCULAR REDWOOD TANK PLATFORMS, RIGHT, LOOKING EAST, NORTHEAST. - Mariscal Quicksilver Mine & Reduction Works, Terlingua, Brewster County, TX

  2. GENERAL OVERHEAD VIEW OF MARISCAL WORKS, SHOWING ORE BIN, LEFT, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    GENERAL OVERHEAD VIEW OF MARISCAL WORKS, SHOWING ORE BIN, LEFT, CONDENSERS, CENTER, AND CIRCULAR REDWOOD TANK PLATFORMS, RIGHT, LOOKING EAST, NORTHEAST. - Mariscal Quicksilver Mine & Reduction Works, Terlingua, Brewster County, TX

  3. 35. OVERHEAD VIEW OF VIVIANNA WORKS ORE BIN LOOKING NORTHEAST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. OVERHEAD VIEW OF VIVIANNA WORKS ORE BIN LOOKING NORTHEAST. GENERATOR BUILDING TOP LEFT, OFFICE AND STOREROOM TOP CENTER, ROTARY KILN AND CONDENSER PLATFORM RIGHT. - Mariscal Quicksilver Mine & Reduction Works, Terlingua, Brewster County, TX

  4. 16. VIEW OF OVERHEAD DOOR TO HOP DRYER NO. 3. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. VIEW OF OVERHEAD DOOR TO HOP DRYER NO. 3. ALL EIGHT HOP DRYERS ARE ON THE SECOND FLOOR. - James W. Seavey Hop Driers, 0.6 mile East from junction of Highway 99 & Alexander Avenue, Corvallis, Benton County, OR

  5. 59. SECOND FLOOR, STEEL OVERHEAD CONVEYOR SUPPORT FRAMEWORK ABUTTING FOOTBRIDGE, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    59. SECOND FLOOR, STEEL OVERHEAD CONVEYOR SUPPORT FRAMEWORK ABUTTING FOOTBRIDGE, BAY 18, TO SOUTHEAST - Ford Motor Company Edgewater Assembly Plant, Assembly Building, 309 River Road, Edgewater, Bergen County, NJ

  6. Southeast corner with overhead crane in foreground Bureau of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Southeast corner with overhead crane in foreground - Bureau of Mines Boulder City Experimental Station, Titanium Development Plant, Date Street north of U.S. Highway 93, Boulder City, Clark County, NV

  7. 9. VIEW SOUTH OF TURBINE ROOM INTERIOR, WITH OVERHEAD CRANE; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. VIEW SOUTH OF TURBINE ROOM INTERIOR, WITH OVERHEAD CRANE; ABANDONED ARMATURES IN CENTER FOREGROUND; BUS PANEL REMAINS AT LOWER RIGHT CENTER - Turners Falls Power & Electric Company, Hampden Station, East bank of Connecticut River, Chicopee, Hampden County, MA

  8. 7. VIEW SHOWING EAST ELEVATION OF OVERHEAD BRIDGE CONNECTING NAPPING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. VIEW SHOWING EAST ELEVATION OF OVERHEAD BRIDGE CONNECTING NAPPING BUILDING (LEFT) WITH CLOTH ROOM (RIGHT), LOOKING WEST - Massachusetts Mills, Cloth Room-Section 15, 95 Bridge Street, Lowell, Middlesex County, MA

  9. 12. Interior view, grain tanks (bins). Profile view of overhead ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Interior view, grain tanks (bins). Profile view of overhead (fill) conveyor gallery bridge extending through tops of tanks just below roofs. - Saint Anthony Elevator No. 3, 620 Malcom Avenue, Southeast, Minneapolis, Hennepin County, MN

  10. Detail, east side, north end, showing door and overhead rail ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Detail, east side, north end, showing door and overhead rail for refrigeration room. - Fitzsimons General Hospital, Ice Plant, Southwest Corner of East I Avenue & North Thirteenth Street, Aurora, Adams County, CO

  11. INTERIOR VIEW OF THE OVERHEAD GARAGE DOOR. SHOWING THE LARGE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    INTERIOR VIEW OF THE OVERHEAD GARAGE DOOR. SHOWING THE LARGE OPENING WITH CAST STONE SILL IN THE EXTERIOR GARAGE WALL AT LEFT. VIEW FACING NORTHWEST. - Hickam Field, Officers' Housing Type F, 602 Beard Avenue, Honolulu, Honolulu County, HI

  12. 28. SHOWER AND URINALS, OVERHEAD TOILET STRUCTURE ABOVE ROOF PANEL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. SHOWER AND URINALS, OVERHEAD TOILET STRUCTURE ABOVE ROOF PANEL STORAGE AREA. VIEW TO SOUTH-SOUTHWEST. - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA

  13. 27. OVERHEAD TOILET, SHOWER, CHANGE ROOM STRUCTURE. VIEW TO NORTHNORTHEAST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. OVERHEAD TOILET, SHOWER, CHANGE ROOM STRUCTURE. VIEW TO NORTH-NORTHEAST. - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA

  14. INTERIOR VIEW, SETTING LARGE CORE WITH ASSISTANCE FROM THE OVERHEAD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    INTERIOR VIEW, SETTING LARGE CORE WITH ASSISTANCE FROM THE OVERHEAD RAIL CRANE IN BOX FLOOR MOLD AREA (WORKERS: DAN T. WELLS AND TRUMAN CARLISLE). - Stockham Pipe & Fittings Company, Ductile Iron Foundry, 4000 Tenth Avenue North, Birmingham, Jefferson County, AL

  15. Overhead Projector Demonstrations: Tilted TOPS: Inclined Plane Projection.

    ERIC Educational Resources Information Center

    Alyea, Hubert N.

    1989-01-01

    The construction and uses of a device to facilitate the use of an overhead projector to show chemical reactions is presented. Materials and instructions for construction as well as reactor vessels are discussed. (CW)

  16. 161. BLACKSMITH SHOP, OVERHEAD SHAFT. BELT ON LEFT CONNECTS TO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    161. BLACKSMITH SHOP, OVERHEAD SHAFT. BELT ON LEFT CONNECTS TO SHAFTS WHICH RUN POWER PRESS AND HYDRAULIC TIRE SETTER. - Gruber Wagon Works, Pennsylvania Route 183 & State Hill Road at Red Bridge Park, Bernville, Berks County, PA

  17. Overhead Projector Demonstrations: A Classroom Demonstration of Aliphatic Substitution.

    ERIC Educational Resources Information Center

    Perina, Ivo; Mihanovic, Branka

    1989-01-01

    Presents a halogen substitution of an alkane using a compartmentalized Petri dish or Conway dish on an overhead projector. Provides methodology and several modifications for different reactions. Uses hexane, methyl orange, bromine, and silver nitrate. (MVL)

  18. Looking north toward unit 1 pump motor, overhead crane, and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Looking north toward unit 1 pump motor, overhead crane, and double folding doors on the north side of the building - Wellton-Mohawk Irrigation System, Pumping Plant No. 2, Bounded by Interstate 8 to south, Wellton, Yuma County, AZ

  19. 14. INTERIOR, INSPECTION PITS AND OVERHEAD CATWALKS, FACING WEST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. INTERIOR, INSPECTION PITS AND OVERHEAD CATWALKS, FACING WEST - Delaware, Lackawanna & Western Railroad Freight & Rail Yard, Multiple Unit Light Inspection Shed, New Jersey Transit Hoboken Terminal Rail Yard, Hoboken, Hudson County, NJ

  20. 13. DETAIL, LATERAL BRACING FOR INTERIOR OVERHEAD CRANE Delaware, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. DETAIL, LATERAL BRACING FOR INTERIOR OVERHEAD CRANE - Delaware, Lackawanna & Western Railroad Freight & Rail Yard, Multiple Unit Light Inspection Shed, New Jersey Transit Hoboken Terminal Rail Yard, Hoboken, Hudson County, NJ

  1. 17. INTERIOR, INSPECTION PITS, OVERHEAD CRANE SUPPORT AND CAR JACKING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. INTERIOR, INSPECTION PITS, OVERHEAD CRANE SUPPORT AND CAR JACKING PADS, FACING EAST - Delaware, Lackawanna & Western Railroad Freight & Rail Yard, Multiple Unit Light Inspection Shed, New Jersey Transit Hoboken Terminal Rail Yard, Hoboken, Hudson County, NJ

  2. INTERIOR VIEW OF SHED, SHOWING STRUCTURAL SYSTEM AND OVERHEAD DOOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    INTERIOR VIEW OF SHED, SHOWING STRUCTURAL SYSTEM AND OVERHEAD DOOR MOUNTING, LOOKING NORTHEAST - Marvine Colliery, Shed, West side Boulevard Avenue, between East Parker Street & Route 380, Scranton, Lackawanna County, PA

  3. WEST ELEVATION, CAMERA FACING EAST. THE OVERHEAD PIPES ARE FOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    WEST ELEVATION, CAMERA FACING EAST. THE OVERHEAD PIPES ARE FOR DISTRIBUTING STEAM FROM THE NEARBY HEATING PLANT TO VARIOUS PARTS OF THE COMPLEX. - New Haven Rail Yard, Oil Storage Building, Vicinity of Union Avenue, New Haven, New Haven County, CT

  4. Interior view of main section of milk barn. Opening overhead ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior view of main section of milk barn. Opening overhead leads to attic crawl space. Camera is pointed SW. - Kosai Farm, Milk Barn, B Street north of Northwest Twenty-ninth Street, Auburn, King County, WA

  5. 13. TURNING DEVICE SUSPENDED FROM, AND LIFTED BY THE OVERHEAD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. TURNING DEVICE SUSPENDED FROM, AND LIFTED BY THE OVERHEAD CRANE SYSTEM EAST OF No. 1 PRESS. - U.S. Steel Homestead Works, Press Shop No. 1, Along Monongahela River, Homestead, Allegheny County, PA

  6. 7. Ball mill area and second level entry with overhead ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Ball mill area and second level entry with overhead crane in background - Bureau of Mines Boulder City Experimental Station, Ore Dressing Pilot Plant, Date Street north of U.S. Highway 93, Boulder City, Clark County, NV

  7. 4. SOUTHWARD OVERHEAD VIEW OF INGOT TRANSFER TRACKS AND INGOT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. SOUTHWARD OVERHEAD VIEW OF INGOT TRANSFER TRACKS AND INGOT BUGGY ADJACENT TO SOAKING PITS ON RIGHT, IN THE PRIMARY MILL BUILDING. - U.S. Steel Duquesne Works, Primary Mill, Along Monongahela River, Duquesne, Allegheny County, PA

  8. TOWER SECOND FLOOR INTERIOR, LOOKING WEST, SHOWING OVERHEAD TRACK DIAGRAM, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    TOWER SECOND FLOOR INTERIOR, LOOKING WEST, SHOWING OVERHEAD TRACK DIAGRAM, OPERATING LEVERS (BEING PULLED BY OPERATOR TOM HARTMAN), AND AUXILIARY TRACK DIAGRAM ABOVE DESK AT LEFT. - Baltimore & Ohio Railroad, Z Tower, State Route 46, Keyser, Mineral County, WV

  9. Stretched Wire Mechanics

    SciTech Connect

    Bowden, Gordon; /SLAC

    2005-09-06

    Stretched wires are beginning to play an important role in the alignment of accelerators and synchrotron light sources. Stretched wires are proposed for the alignment of the 130 meter long LCLS undulator. Wire position technology has reached sub-micron resolution yet analyses of perturbations to wire straightness are hard to find. This paper considers possible deviations of stretched wire from the simple 2-dimensional catenary form.

  10. Shoulder problems in overhead sports. Part I - biomechanics of throwing.

    PubMed

    Kaczmarek, Piotr Krzysztof; Lubiatowski, Przemysław; Cisowski, Paweł; Grygorowicz, Monika; Łepski, Marcin; Długosz, Jan; Ogrodowicz, Piotr; Dudziński, Witold; Nowak, Maciej; Romanowski, Leszek

    2014-05-15

    The article discusses the biomechanical processes that occur during an overhead throw. This activity is highly specialized and requires full and proper function from the shoulder joint. It consists of active and passive stabilization and synchronous work of the accelerating and decelerating muscles. The process of the overhead throw can be divided into several phases that differ from each other in biomechanical parameters and involvement of specific muscles.

  11. 16. THE INSTALLATION OF CONVEYORS AND OVERHEAD RAILS ELIMINATED THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. THE INSTALLATION OF CONVEYORS AND OVERHEAD RAILS ELIMINATED THE NEED TO LAY MOLDS OUT ON FLOORS AND HAND-POUR THEM. INSTEAD, WORKERS PULLED LARGE LADLES ALONG OVERHEAD RAILS AND FILLED CONVEYOR-DRIVEN MOLDS WHILE THEY STOOD ON A MOVING PLATFORM THAT TRAVELED AT THE SAME SPEED AS THE MOLD CONVEYOR, CA. 1950. - Stockham Pipe & Fittings Company, 4000 Tenth Avenue North, Birmingham, Jefferson County, AL

  12. Computer-based mechanical design of overhead lines

    NASA Astrophysics Data System (ADS)

    Rusinaru, D.; Bratu, C.; Dinu, R. C.; Manescu, L. G.

    2016-02-01

    Beside the performance, the safety level according to the actual standards is a compulsory condition for distribution grids’ operation. Some of the measures leading to improvement of the overhead lines reliability ask for installations’ modernization. The constraints imposed to the new lines components refer to the technical aspects as thermal stress or voltage drop, and look for economic efficiency, too. The mechanical sizing of the overhead lines is after all an optimization problem. More precisely, the task in designing of the overhead line profile is to size poles, cross-arms and stays and locate poles along a line route so that the total costs of the line's structure to be minimized and the technical and safety constraints to be fulfilled.The authors present in this paper an application for the Computer-Based Mechanical Design of the Overhead Lines and the features of the corresponding Visual Basic program, adjusted to the distribution lines. The constraints of the optimization problem are adjusted to the existing weather and loading conditions of Romania. The outputs of the software application for mechanical design of overhead lines are: the list of components chosen for the line: poles, cross-arms, stays; the list of conductor tension and forces for each pole, cross-arm and stay for different weather conditions; the line profile drawings.The main features of the mechanical overhead lines design software are interactivity, local optimization function and high-level user-interface

  13. Clouds Sailing Overhead on Mars, Unenhanced

    NASA Image and Video Library

    2017-08-09

    Wispy clouds float across the Martian sky in this accelerated sequence of images from NASA's Curiosity Mars rover. The rover's Navigation Camera (Navcam) took these eight images over a span of four minutes early in the morning of the mission's 1,758th Martian day, or sol (July 17, 2017), aiming nearly straight overhead. This sequence uses raw images, which include a bright ring around the center of the frame that is an artifact of sunlight striking the camera lens even though the Sun is not in the shot. A processed version removing that artifact and emphasizing changes between images is also available. The clouds resemble Earth's cirrus clouds, which are ice crystals at high altitudes. These Martian clouds are likely composed of crystals of water ice that condense onto dust grains in the cold Martian atmosphere. Cirrus wisps appear as ice crystals fall and evaporate in patterns known as "fall streaks" or "mare's tails." Such patterns have been seen before at high latitudes on Mars, for instance by the Phoenix Mars Lander in 2008, and seasonally nearer the equator, for instance by the Opportunity rover. However, Curiosity has not previously observed such clouds so clearly visible from the rover's study area about five degrees south of the equator. The Hubble Space Telescope and spacecraft orbiting Mars have observed a band of clouds to appear near the Martian equator around the time of the Martian year when the planet is farthest from the Sun. With a more elliptical orbit than Earth's, Mars experiences more annual variation than Earth in its distance from the Sun. The most distant point in an orbit around the Sun is called the aphelion. The near-equatorial Martian cloud pattern observed at that time of year is called the "aphelion cloud belt." These new images from Curiosity were taken about two months before aphelion, but the morning clouds observed may be an early stage of the aphelion cloud belt. An animation is available at https

  14. Clouds Sailing Overhead on Mars, Enhanced

    NASA Image and Video Library

    2017-08-09

    Wispy clouds float across the Martian sky in this accelerated sequence of enhanced images from NASA's Curiosity Mars rover. The rover's Navigation Camera (Navcam) took these eight images over a span of four minutes early in the morning of the mission's 1,758th Martian day, or sol (July 17, 2017), aiming nearly straight overhead. They have been processed by first making a "flat field' adjustment for known differences in sensitivity among pixels and correcting for camera artifacts due to light reflecting within the camera, and then generating an "average" of all the frames and subtracting that average from each frame. This subtraction results in emphasizing any changes due to movement or lighting. The clouds are also visible, though fainter, in a raw image sequence from these same observations. On the same Martian morning, Curiosity also observed clouds near the southern horizon. The clouds resemble Earth's cirrus clouds, which are ice crystals at high altitudes. These Martian clouds are likely composed of crystals of water ice that condense onto dust grains in the cold Martian atmosphere. Cirrus wisps appear as ice crystals fall and evaporate in patterns known as "fall streaks" or "mare's tails." Such patterns have been seen before at high latitudes on Mars, for instance by the Phoenix Mars Lander in 2008, and seasonally nearer the equator, for instance by the Opportunity rover. However, Curiosity has not previously observed such clouds so clearly visible from the rover's study area about five degrees south of the equator. The Hubble Space Telescope and spacecraft orbiting Mars have observed a band of clouds to appear near the Martian equator around the time of the Martian year when the planet is farthest from the Sun. With a more elliptical orbit than Earth's, Mars experiences more annual variation than Earth in its distance from the Sun. The most distant point in an orbit around the Sun is called the aphelion. The near-equatorial Martian cloud pattern observed at

  15. Concealed wire tracing apparatus

    DOEpatents

    Kronberg, James W.

    1994-01-01

    An apparatus and method that combines a signal generator and a passive signal receiver to detect and record the path of partially or completely concealed electrical wiring without disturbing the concealing surface. The signal generator applies a series of electrical pulses to the selected wiring of interest. The applied pulses create a magnetic field about the wiring that can be detected by a coil contained within the signal receiver. An audible output connected to the receiver and driven by the coil reflects the receivers position with respect to the wiring. The receivers audible signal is strongest when the receiver is directly above the wiring and the long axis of the receivers coil is parallel to the wiring. A marking means is mounted on the receiver to mark the location of the wiring as the receiver is directed over the wiring's concealing surface. Numerous marks made on various locations of the concealing surface will trace the path of the wiring of interest.

  16. Performance of gas-insulated substations and associated grounding networks during fault and transient conditions

    SciTech Connect

    Lee, H.; Dawalibi, F.P.; Ruan, W.; Fortin, S.

    1996-11-01

    This paper discusses in detail the electric modeling of the overhead tubular enclosures of a 500 kV circuit breaker in a gas insulated substation. Under both steady-state and phase-to-ground fault conditions, the current distribution on the enclosure as well as the spatial distribution of the scalar potentials and electromagnetic fields near the circuit breaker are computed at different frequencies for various wire-mesh models of the breaker enclosure. The selected frequencies are representative of those present in the frequency spectrum of typical lightning transient currents. The different models of the breaker enclosure are obtained by varying the number of conductors used to represent the enclosure. For a given enclosure diameter and length, the minimum number of conductors required to obtain satisfactory current distribution and electromagnetic field results at different frequencies are determined.

  17. Validation of the Algorithm for Base Maintenance Overhead Costs for the Component Support Cost System (D160B).

    DTIC Science & Technology

    2014-09-26

    FOR I BASE MAINTENANCE OVERHEAD COSTS FOR THE COMPONENT SUPPORT COST SYSTEM (D160B) Contract No. F33600-82-C-0543 DTIC 13 December 1983 S ELECTED JUL 1...PREFIXES SRD Prefix Definition A-- Aircraft and Drones G-- Support Equipment H-- Precision Measurement Equipment N-- Air launched missiles and Guided...Missiles; Ground- O Launched Missiles; Except ICBMS; Drones ; and Related Training Equipment, 1 August 1976, updated to 15 October 1982 [221 TO-00-20-2-l0

  18. Wire Test Grip Fixture

    NASA Technical Reports Server (NTRS)

    Burke, Christopher S.

    2011-01-01

    Wire-testing issues, such as the gripping strains imposed on the wire, play a critical role in obtaining clean data. In a standard test frame fitted with flat wedge grips, the gripping action alone creates stresses on the wire specimen that cause the wire to fail at the grip location. A new test frame, which is outfitted with a vacuum chamber, negated the use of any conventional commercially available wire test fixtures, as only 7 in. (17.8 cm) existed between the grip faces. An innovative grip fixture was designed to test thin gauge wire for a variety of applications in an existing Instron test frame outfitted with a vacuum chamber.

  19. Asymmetric resting scapular posture in healthy overhead athletes.

    PubMed

    Oyama, Sakiko; Myers, Joseph B; Wassinger, Craig A; Daniel Ricci, R; Lephart, Scott M

    2008-01-01

    Observation of the scapular posture is one of the most important components of the physical examination in overhead athletes. Postural asymmetry is typically considered to be associated with injuries. However, asymmetry in the overhead athlete's scapula may be normal due to the dominant use of the limb. To quantify the differences in resting scapular posture between the dominant and nondominant sides in 3 groups of healthy overhead athletes (baseball pitchers, volleyball players, and tennis players) using an electromagnetic tracking device. Cross-sectional design. University-based biomechanics laboratory. A total of 43 players participated, including 15 baseball pitchers, 15 volleyball players, and 13 tennis players. All participants were healthy college-aged men. Bilateral 3-dimensional scapular kinematics with the arm at rest were measured using an electromagnetic tracking device. Bilateral scapular position and orientation were measured. Between-groups and between-sides differences in each variable were analyzed using separate analyses of variance. In tennis players, the scapula was more protracted on the dominant side than on the nondominant side (P < .05). In all overhead athletes, the dominant-side scapula was more internally rotated (P = .001) and anteriorly tilted (P = .001) than the nondominant-side scapula was. The dominant-side scapula of the overhead athletes was more internally rotated and anteriorly tilted than the nondominant-side scapula. The dominant-side scapula of the tennis players was more protracted than that on the nondominant side. Clinicians evaluating overhead athletes need to recognize that scapular posture asymmetry in unilateral overhead athletes may be normal. Our results emphasize the importance of the baseline evaluation in this population in order to accurately assess pathologic change in bilateral scapular positions and orientations after injury.

  20. Asymmetric Resting Scapular Posture in Healthy Overhead Athletes

    PubMed Central

    Oyama, Sakiko; Myers, Joseph B; Wassinger, Craig A; Daniel Ricci, R; Lephart, Scott M

    2008-01-01

    Context: Observation of the scapular posture is one of the most important components of the physical examination in overhead athletes. Postural asymmetry is typically considered to be associated with injuries. However, asymmetry in the overhead athlete's scapula may be normal due to the dominant use of the limb. Objective: To quantify the differences in resting scapular posture between the dominant and nondominant sides in 3 groups of healthy overhead athletes (baseball pitchers, volleyball players, and tennis players) using an electromagnetic tracking device. Design: Cross-sectional design. Setting: University-based biomechanics laboratory. Patients or Other Participants: A total of 43 players participated, including 15 baseball pitchers, 15 volleyball players, and 13 tennis players. All participants were healthy college-aged men. Intervention(s): Bilateral 3-dimensional scapular kinematics with the arm at rest were measured using an electromagnetic tracking device. Main Outcome Measure(s): Bilateral scapular position and orientation were measured. Between-groups and between-sides differences in each variable were analyzed using separate analyses of variance. Results: In tennis players, the scapula was more protracted on the dominant side than on the nondominant side (P < .05). In all overhead athletes, the dominant-side scapula was more internally rotated (P  =  .001) and anteriorly tilted (P  =  .001) than the nondominant-side scapula was. Conclusions: The dominant-side scapula of the overhead athletes was more internally rotated and anteriorly tilted than the nondominant-side scapula. The dominant-side scapula of the tennis players was more protracted than that on the nondominant side. Clinicians evaluating overhead athletes need to recognize that scapular posture asymmetry in unilateral overhead athletes may be normal. Our results emphasize the importance of the baseline evaluation in this population in order to accurately assess pathologic change in

  1. Base Information Transport Infrastructure Wired (BITI Wired)

    DTIC Science & Technology

    2016-03-01

    2016 Major Automated Information System Annual Report Base Information Transport Infrastructure Wired (BITI Wired) Defense Acquisition Management ...Major Automated Information System MAIS OE - MAIS Original Estimate MAR – MAIS Annual Report MDA - Milestone Decision Authority MDD - Materiel...Combat Information Transport System program was restructured into two pre-Major Automated Information System (pre-MAIS) components: Information

  2. CURRENT CONCEPTS IN SHOULDER EXAMINATION OF THE OVERHEAD ATHLETE

    PubMed Central

    Ellenbecker, Todd

    2013-01-01

    Examination of the shoulder complex has long been described as challenging. This is particularly true in the examination of the overhead athlete who has structural differences when compared to a shoulder patient who is a non‐athlete. Complexity with the examination is due to unique biomechanical and structural changes, multiple joint articulations, multiple pain patterns, and the potential of injury to structures both inside (intra‐articular) and outside (extra‐articular) the glenohumeral joint. Repetitive stresses placed on the shoulders of overhead athletes may affect range of motion, strength, scapular position, and ultimately, the integrity of soft tissue and bony structures in any of the joints that comprise the shoulder complex. Furthermore, many shoulder examination tests thought to be unique to a single structure, joint, or condition can be positive in multiple conditions. The examination of the overhead athletes shoulder, coupled with a thorough medical history will provide a solid foundation to allow a functional physical therapy diagnosis and provide clues as to the presence of the lesion (s) causing disability. The purpose of this clinical commentary is to assist the reader to understand the unique physical characteristics of the overhead athlete, which will lead to a more accurate and reproducible evaluation of athletes who sustain injuries while participating in overhead sports. Level of Evidence: 5 PMID:24175138

  3. A Reference Model for Virtual Machine Launching Overhead

    SciTech Connect

    Wu, Hao; Ren, Shangping; Garzoglio, Gabriele; Timm, Steven; Bernabeu, Gerard; Chadwick, Keith; Noh, Seo-Young

    2016-07-01

    Cloud bursting is one of the key research topics in the cloud computing communities. A well designed cloud bursting module enables private clouds to automatically launch virtual machines (VMs) to public clouds when more resources are needed. One of the main challenges in developing a cloud bursting module is to decide when and where to launch a VM so that all resources are most effectively and efficiently utilized and the system performance is optimized. However, based on system operational data obtained from FermiCloud, a private cloud developed by the Fermi National Accelerator Laboratory for scientific workflows, the VM launching overhead is not a constant. It varies with physical resource utilization, such as CPU and I/O device utilizations, at the time when a VM is launched. Hence, to make judicious decisions as to when and where a VM should be launched, a VM launching overhead reference model is needed. In this paper, we first develop a VM launching overhead reference model based on operational data we have obtained on FermiCloud. Second, we apply the developed reference model on FermiCloud and compare calculated VM launching overhead values based on the model with measured overhead values on FermiCloud. Our empirical results on FermiCloud indicate that the developed reference model is accurate. We believe, with the guidance of the developed reference model, efficient resource allocation algorithms can be developed for cloud bursting process to minimize the operational cost and resource waste.

  4. Report on Analyses of WAC Samples of Evaporator Overheads - 2004

    SciTech Connect

    Oji, L

    2005-03-18

    In November and December of 2004, the Tank Farm submitted annual samples from 2F, 2H and 3H Evaporator Overhead streams for characterization to verify compliance with the new Effluent Treatment Facility (ETF) Waste Acceptance Criteria (WAC) and to look for organic species. With the exception of slightly high ammonia in the 2F evaporator overheads and high radiation control guide number for the 3H and 2F evaporator overhead samples, all the overheads samples were found to be in compliance with the Effluent Treatment Facility WAC. The ammonium concentration in the 2F-evaporator overhead, at 33 mg/L, was above the ETF waste water collection tank (WWCT) limits of 28 mg/L. The RCG Number for the 3H and 2F evaporator samples at, respectively, 1.38E-02 and 8.24E-03 were higher than the WWCT limit of 7.69E-03. The analytical detection limits for americium-241 and radium-226 in the evaporator samples were not consistently met because of low WWCT detection limits and insufficient evaporator samples.

  5. Ergonomic Assessment of Floor-based and Overhead Lifts

    PubMed Central

    Waters, Thomas R.; Dick, Robert; Lowe, Brian; Werren, Dwight; Parsons, Kelley

    2015-01-01

    Manual full-body vertical lifts of patients have high risk for developing musculoskeletal disorders. Two primary types of battery-powered lift assist devices are available for these tasks: floor-based and overhead-mounted devices. Studies suggest that the operation of floor-based devices may require excessive pushing and pulling forces and that overhead-mounted devices are safer and require lower operating forces. This study evaluated required operating hand forces and resulting biomechanical spinal loading for overhead-mounted lifts versus floor-based lifts across various floor surfaces and patient weight conditions. We did not examine differences in how operators performed the tasks, but rather focused on differences in required operating forces and estimated biomechanical loads across various exposure conditions for a typical operator. Findings show that the floor-based lifts exceeded recommended exposure limits for pushing and pulling for many of the floor/weight conditions and that the overhead-mounted lifts did not. As expected, forces and spinal loads were greater for nonlinoleum floor surfaces compared with linoleum floors. Based on these findings, it is suggested that overhead-mounted devices be used whenever possible, particularly in instances where carpeted floors would be encountered. PMID:26550545

  6. Biceps instability and Slap type II tear in overhead athletes

    PubMed Central

    Osti, Leonardo; Soldati, Francesco; Cheli, Andrea; Pari, Carlotta; Massari, Leo; Maffulli, Nicola

    2012-01-01

    Summary Type II lesions are common lesions encountered in overhead athletes with controversies arising in term of timing for treatment, surgical approach, rehabilitation and functional results. The aim of our study was to evaluate the outcomes of arthroscopic repair of type II SLAP tears in overhead athletes, focusing on the time elapsed from diagnosis and treatment, time needed to return to sport, rate of return to sport and to previous level of performance, providing an overview concerning evidence for the effectiveness of different surgical approaches to type II SLAP tears in overhead athletes. A internet search on peer reviewed Journal from 1990, first descriprion of this pathology, to 2012, have been conducted evaluating the outcomes for both isolated Slap II tear overhead athletes and those who presented associated lesions treated. The results have been analyzed according to the scale reported focusing on return to sport and level of activity. Apart from a single study, non prospective level I and II studies were detected. Return to play at the same level ranged form 22% to 94% with different range of technique utilized with the majority of the authors recommending the fixation of these lesions but biceps tenodesis can lead to higher satisfaction racte when directly compated to the anchor fixation. Associated pathologies such as partial or full tickness rotator cuff tear did not clearly affect the outcomes and complications rate. There is no consensus regarding timing and treatment for type II SLAP, especially in overhead athletes who need to regain a high level of performance. PMID:23738307

  7. Biceps instability and Slap type II tear in overhead athletes.

    PubMed

    Osti, Leonardo; Soldati, Francesco; Cheli, Andrea; Pari, Carlotta; Massari, Leo; Maffulli, Nicola

    2012-10-01

    Type II lesions are common lesions encountered in overhead athletes with controversies arising in term of timing for treatment, surgical approach, rehabilitation and functional results. The aim of our study was to evaluate the outcomes of arthroscopic repair of type II SLAP tears in overhead athletes, focusing on the time elapsed from diagnosis and treatment, time needed to return to sport, rate of return to sport and to previous level of performance, providing an overview concerning evidence for the effectiveness of different surgical approaches to type II SLAP tears in overhead athletes. A internet search on peer reviewed Journal from 1990, first descriprion of this pathology, to 2012, have been conducted evaluating the outcomes for both isolated Slap II tear overhead athletes and those who presented associated lesions treated. The results have been analyzed according to the scale reported focusing on return to sport and level of activity. Apart from a single study, non prospective level I and II studies were detected. Return to play at the same level ranged form 22% to 94% with different range of technique utilized with the majority of the authors recommending the fixation of these lesions but biceps tenodesis can lead to higher satisfaction racte when directly compated to the anchor fixation. Associated pathologies such as partial or full tickness rotator cuff tear did not clearly affect the outcomes and complications rate. There is no consensus regarding timing and treatment for type II SLAP, especially in overhead athletes who need to regain a high level of performance.

  8. Modeling Spatial Dependencies in High-Resolution Overhead Imagery

    SciTech Connect

    Cheriyadat, Anil M; Bright, Eddie A; Vatsavai, Raju

    2011-01-01

    Human settlement regions with different physical and socio-economic attributes exhibit unique spatial characteristics that are often illustrated in high-resolution overhead imageries. For example- size, shape and spatial arrangements of man-made structures are key attributes that vary with respect to the socioeconomic profile of the neighborhood. Successfully modeling these attributes is crucial in developing advanced image understanding systems for interpreting complex aerial scenes. In this paper we present three different approaches to model the spatial context in the overhead imagery. First, we show that the frequency domain of the image can be used to model the spatial context [1]. The shape of the spectral energy contours characterize the scene context and can be exploited as global features. Secondly, we explore a discriminative framework based on the Conditional Random Fields (CRF) [2] to model the spatial context in the overhead imagery. The features derived from the edge orientation distribution calculated for a neighborhood and the associated class labels are used as input features to model the spatial context. Our third approach is based on grouping spatially connected pixels based on the low-level edge primitives to form support-regions [3]. The statistical parameters generated from the support-region feature distributions characterize different geospatial neighborhoods. We apply our approaches on high-resolution overhead imageries. We show that proposed approaches characterize the spatial context in overhead imageries.

  9. Cable Bundle Wire Derating

    NASA Technical Reports Server (NTRS)

    Lundquist, Ray A.; Leidecker, Henning

    1999-01-01

    The allowable operating currents of electrical wiring when used in the space vacuum environment is predominantly determined by the maximum operating temperature of the wire insulation. For Kapton insulated wire this value is 200 degree C. Guidelines provided in the Goddard Space Flight Center (GSFC) Preferred Parts List (PPL) limit the operating current of wire within vacuum to ensure the maximum insulation temperature is not exceeded. For 20 AWG wire, these operating parameters are: (1) 3.7 amps per wire (2) bundle of 15 or more wires (3) 70 C environment (4) vacuum of 10(exp -5) torr or less To determine the behavior and temperature of electrical wire at different operating conditions, a thermal vacuum test was performed on a representative electrical harness of the Hubble Space Telescope (HST) power distribution system. This paper describes the test and the results.

  10. Cable Bundle Wire Derating

    NASA Technical Reports Server (NTRS)

    Lundquist, Ray A.; Leidecker, Henning

    1998-01-01

    The allowable operating currents of electrical wiring when used in the space vacuum environment is predominantly determined by the maximum operating temperature of the wire insulation. For Kapton insulated wire this value is 200 C. Guidelines provided in the Goddard Space Flight Center (GSFC) Preferred Parts List (PPL) limit the operating current of wire within vacuum to ensure the maximum insulation temperature is not exceeded. For 20 AWG wire, these operating parameters are: 3.7 amps per wire, bundle of 15 or more wires, 70 C environment, and vacuum of 10(exp -5) torr or less. To determine the behavior and temperature of electrical wire at different operating conditions, a thermal vacuum test was performed on a representative electrical harness of the Hubble Space Telescope (HST) power distribution system. This paper describes the test and the results.

  11. Cable Bundle Wire Derating

    NASA Technical Reports Server (NTRS)

    Lundquist, Ray A.; Leidecker, Henning

    1998-01-01

    The allowable operating currents of electrical wiring when used in the space vacuum environment is predominantly determined by the maximum operating temperature of the wire insulation. For Kapton insulated wire this value is 200 C. Guidelines provided in the Goddard Space Flight Center (GSFC) Preferred Parts List (PPL) limit the operating current of wire within vacuum to ensure the maximum insulation temperature is not exceeded. For 20 AWG wire, these operating parameters are: (1) 3.7 amps per wire; (2) bundle of 15 or more wires; (3) 70 C environment: and (4) vacuum of 10(exp -5) torr or less. To determine the behavior and temperature of electrical wire at different operating conditions, a thermal vacuum test was performed on a representative electrical harness of the Hubble Space Telescope (HST) power distribution system. This paper describes the test and the results.

  12. Cable Bundle Wire Derating

    NASA Technical Reports Server (NTRS)

    Lundquist, Ray A.; Leidecker, Henning

    1998-01-01

    The allowable operating currents of electrical wiring when used in the space vacuum environment is predominantly determined by the maximum operating temperature of the wire insulation. For Kapton insulated wire this value is 200 C. Guidelines provided in the Goddard Space Flight Center (GSFC) Preferred Parts List (PPL) limit the operating current of wire within vacuum to ensure the maximum insulation temperature is not exceeded. For 20 AWG wire, these operating parameters are: 3.7 amps per wire, bundle of 15 or more wires, 70 C environment, and vacuum of 10(exp -5) torr or less. To determine the behavior and temperature of electrical wire at different operating conditions, a thermal vacuum test was performed on a representative electrical harness of the Hubble Space Telescope (HST) power distribution system. This paper describes the test and the results.

  13. Wire harness twisting aid

    NASA Technical Reports Server (NTRS)

    Casey, E. J.; Commadore, C. C.; Ingles, M. E.

    1980-01-01

    Long wire bundles twist into uniform spiral harnesses with help of simple apparatus. Wires pass through spacers and through hand-held tool with hole for each wire. Ends are attached to low speed bench motor. As motor turns, operator moves hand tool away forming smooth twists in wires between motor and tool. Technique produces harnesses that generate less radio-frequency interference than do irregularly twisted cables.

  14. Wire harness twisting aid

    NASA Technical Reports Server (NTRS)

    Casey, E. J.; Commadore, C. C.; Ingles, M. E.

    1980-01-01

    Long wire bundles twist into uniform spiral harnesses with help of simple apparatus. Wires pass through spacers and through hand-held tool with hole for each wire. Ends are attached to low speed bench motor. As motor turns, operator moves hand tool away forming smooth twists in wires between motor and tool. Technique produces harnesses that generate less radio-frequency interference than do irregularly twisted cables.

  15. Laser Wire Stripper

    NASA Technical Reports Server (NTRS)

    1983-01-01

    NASA-developed space shuttle technology is used in a laser wire stripper designed by Raytheon Company. Laser beams cut through insulation on a wire without damaging conductive metal, because laser radiation that melts plastic insulation is reflected by the metal. The laser process is fast, clean, precise and repeatable. It eliminates quality control problems and the expense of rejected wiring.

  16. EMF wire code research

    SciTech Connect

    Jones, T.

    1993-11-01

    This paper examines the results of previous wire code research to determines the relationship with childhood cancer, wire codes and electromagnetic fields. The paper suggests that, in the original Savitz study, biases toward producing a false positive association between high wire codes and childhood cancer were created by the selection procedure.

  17. Ulnar collateral ligament in the overhead athlete: a current review.

    PubMed

    Dugas, Jeffrey; Chronister, Justin; Cain, E Lyle; Andrews, James R

    2014-09-01

    Ulnar collateral ligament (UCL) injuries are most commonly reported in baseball players (particularly in pitchers) but have also been observed in other overhead athletes including javelin, softball, tennis, volleyball, water polo, and gymnastics. Partial injuries have been successfully treated with appropriate nonoperative measures but complete tears and chronic injuries have shown less benefit from conservative measures. In these cases, surgical reconstruction has become the treatment modality for overhead athlete who wishes to continue to play. This article discusses the functional anatomy and biomechanics of the UCL as related to the pathophysiology of overhead throwing, as well as the important clinical methods needed to make accurate and timely diagnosis. It also gives an updated review of the current clinical outcomes and complications of surgical reconstruction.

  18. Flicking-wire drag tensioner

    NASA Technical Reports Server (NTRS)

    Dassele, M. A.; Fairall, H.

    1978-01-01

    Wire-drag system improves wire profile and applies consistent drag to wire. Wire drag is continuously adjustable from zero drag to tensile strength of wire. No-sag wire drag is easier to thread than former system and requires minimal downtime for cleaning and maintenance.

  19. 18. PRIOR TO THE USE OF CONVEYORS AND OVERHEAD RAILS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. PRIOR TO THE USE OF CONVEYORS AND OVERHEAD RAILS, MOLDERS, USUALLY AFRICAN-AMERICAN, HAD TO INDIVIDUALLY HAND FILL MOLDS LAID OUT ON THE FLOOR, SUCH AS THESE IN THE MALLEABLE FOUNDRY IN 1923. - Stockham Pipe & Fittings Company, 4000 Tenth Avenue North, Birmingham, Jefferson County, AL

  20. DEVELOPMENT AND EVALUATION OF A NEW DEVICE FOR OVERHEAD DRILLING

    PubMed Central

    Rempel, David M.; Star, Demetra; Gibbons, Billy; Barr, Alan; Janowitz, Ira

    2008-01-01

    Drilling overhead into concrete is a strenuous task that is associated with shoulder, arm, neck and back musculoskeletal disorders due to the forceful and awkward aspects of the work. This common task is done to hang pipes, ducts and trays and is performed by construction workers in the electrical, pipe fitting, sheet metal, ironwork and carpentry trades. In this project, alternative devices for overhead drilling were developed in order to reduce the high shoulder loads. The design premise for the alternative devices was adopted from interventions developed on construction sites. These devices were evaluated for usability, productivity, and fatigue in two rounds of testing by 30 construction workers performing their usual overhead drilling. After each round of testing the device designs were modified based on feedback. The final design was associated with much less arm fatigue but similar productivity compared to the usual method for overhead drilling. The feedback, design suggestions and field testing by experienced construction workers was vital to the successful development of these devices. Field testing were done with real tasks, in diverse field settings, with subjects familiar with the task. Multiple rounds of field testing and redesign can significantly improve the safety and usability of new tools. Having experienced workers accessing the new tools can help with determining if and how a new tool is compatible and beneficial to current work practices. PMID:19079737

  1. A Simple Polarimeter and Experiments Utilizing an Overhead Projector.

    ERIC Educational Resources Information Center

    Dorn, H. C.; And Others

    1984-01-01

    Although polarimeters that illustrate rotation of plane-polarized light by chiral solutions have been previously described, the polarimeter described in this paper has certain advantages when used in conjunction with an overhead projector. Instructions for constructing this polarimeter and its use in demonstrating the optical activity of sugars…

  2. Phase Sensitive Cueing for 3D Objects in Overhead Images

    SciTech Connect

    Paglieroni, D

    2005-02-04

    Locating specific 3D objects in overhead images is an important problem in many remote sensing applications. 3D objects may contain either one connected component or multiple disconnected components. Solutions must accommodate images acquired with diverse sensors at various times of the day, in various seasons of the year, or under various weather conditions. Moreover, the physical manifestation of a 3D object with fixed physical dimensions in an overhead image is highly dependent on object physical dimensions, object position/orientation, image spatial resolution, and imaging geometry (e.g., obliqueness). This paper describes a two-stage computer-assisted approach for locating 3D objects in overhead images. In the matching stage, the computer matches models of 3D objects to overhead images. The strongest degree of match over all object orientations is computed at each pixel. Unambiguous local maxima in the degree of match as a function of pixel location are then found. In the cueing stage, the computer sorts image thumbnails in descending order of figure-of-merit and presents them to human analysts for visual inspection and interpretation. The figure-of-merit associated with an image thumbnail is computed from the degrees of match to a 3D object model associated with unambiguous local maxima that lie within the thumbnail. This form of computer assistance is invaluable when most of the relevant thumbnails are highly ranked, and the amount of inspection time needed is much less for the highly ranked thumbnails than for images as a whole.

  3. Overhead Projector Spectrum of Polymethine Dye: A Physical Chemistry Demonstration.

    ERIC Educational Resources Information Center

    Solomon, Sally; Hur, Chinhyu

    1995-01-01

    Encourages the incorporation into lecture of live experiments that can be predicted or interpreted with abstract models. A demonstration is described where the position of the predominant peak of 1,1'-diethyl-4,4'-cyanine iodide is measured in class using an overhead projector spectrometer, then predicted using the model of a particle in a…

  4. 12. OVERHEAD VIEW OF THE EVISCERATION AREA; LOOKING NORTH FROM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. OVERHEAD VIEW OF THE EVISCERATION AREA; LOOKING NORTH FROM THE VISITORS' GALLERY; NOTE THE RAISED CONCRETE PLATFORMS FOR WORKERS; VISCERA TABLE HAS BEEN REMOVED - Rath Packing Company, Beef Killing Building, Sycamore Street between Elm & Eighteenth Streets, Waterloo, Black Hawk County, IA

  5. STOCK YARD LOOKING SOUTHEAST SHOWING OVERHEAD YARD CRANE RAIL, THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    STOCK YARD LOOKING SOUTHEAST SHOWING OVERHEAD YARD CRANE RAIL, THE MALLEABLE CUPOLAS AND EMISSION RECOVERY SYSTEM, OLD SHED ROOF THAT COVERED THE EARLIER MALLEABLE CUPOLA CHARGING CRANE, MALLEABLE FOUNDRY, AND POLLUTION CONTROL BAGHOUSE. - Stockham Pipe & Fittings Company, 4000 Tenth Avenue North, Birmingham, Jefferson County, AL

  6. 5. OVERHEAD VIEW OF GENE CAMP LOOKING SOUTH. GENE PUMP ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. OVERHEAD VIEW OF GENE CAMP LOOKING SOUTH. GENE PUMP PLANT IS AT CENTER WITH ADMINISTRATIVE COMPLEX IN FOREGROUND AND RESIDENTIAL AREA BEYOND PLANT. - Gene Pump Plant, South of Gene Wash Reservoir, 2 miles west of Whitsett Pump Plant, Parker Dam, San Bernardino County, CA

  7. Dissolving Carboxylic Acids and Primary Amines on the Overhead Projector

    ERIC Educational Resources Information Center

    Solomon, Sally D.; Rutkowsky, Susan A.

    2010-01-01

    Liquid carboxylic acids (or primary amines) with limited solubility in water are dissolved by addition of aqueous sodium hydroxide (or hydrochloric acid) on the stage of an overhead projector using simple glassware and very small quantities of chemicals. This effective and colorful demonstration can be used to accompany discussions of the…

  8. 19. Interior view showing flight simulator partition and rear overhead ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Interior view showing flight simulator partition and rear overhead door, dock no. 493. View to south. - Offutt Air Force Base, Looking Glass Airborne Command Post, Nose Docks, On either side of Hangar Access Apron at Northwest end of Project Looking Glass Historic District, Bellevue, Sarpy County, NE

  9. Swing-out rail system separates overhead crane rails

    NASA Technical Reports Server (NTRS)

    Pitkin, R. G.

    1966-01-01

    Swing-out rail system separates and reconnects the overhead traveling crane rails of a building to provide for the passage of a thick concrete radiation shield sliding door through the rails. In the swing-out position, the rail cantilevered from an axial shaft.

  10. 29 CFR 1926.1438 - Overhead & gantry cranes.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes and Derricks in Construction § 1926.1438... equipment when used in construction and permanently installed in a facility: overhead and gantry cranes, including semigantry, cantilever gantry, wall cranes, storage bridge cranes, and others having the same...

  11. Orbiter View of Curiosity From Nearly Straight Overhead

    NASA Image and Video Library

    2012-08-31

    Details such as the shadow of the mast on NASA Mars rover Curiosity appear in an image taken Aug. 17, 2012, by the HiRISE camera on NASA Mars Reconnaissance Orbiter, from more directly overhead than previous HiRISE images of Curiosity.

  12. 13. Emplacement no. 2, overhead view of counterweight well, showing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Emplacement no. 2, overhead view of counterweight well, showing channel for gun motor cable and bolt plates upon which base ring of gun carriage was mounted - Fort Wadsworth Battery Romeyn B. Ayers, South side of Ayers Road, Staten Island, Rosebank, Richmond County, NY

  13. Simulation of Centrifugal Forces on an Overhead Projector

    ERIC Educational Resources Information Center

    Buvari, A.

    1977-01-01

    Describes the use of images on an overhead projector to explain concepts like centrifugal force and Cariolis force in such a way that students can realize that they are pseudo-forces, i.e., observations arising only from referring phenomena to an accelerating reference system. (MLH)

  14. A Simple Polarimeter and Experiments Utilizing an Overhead Projector.

    ERIC Educational Resources Information Center

    Dorn, H. C.; And Others

    1984-01-01

    Although polarimeters that illustrate rotation of plane-polarized light by chiral solutions have been previously described, the polarimeter described in this paper has certain advantages when used in conjunction with an overhead projector. Instructions for constructing this polarimeter and its use in demonstrating the optical activity of sugars…

  15. DEVELOPMENT AND EVALUATION OF A NEW DEVICE FOR OVERHEAD DRILLING.

    PubMed

    Rempel, David M; Star, Demetra; Gibbons, Billy; Barr, Alan; Janowitz, Ira

    2007-11-01

    Drilling overhead into concrete is a strenuous task that is associated with shoulder, arm, neck and back musculoskeletal disorders due to the forceful and awkward aspects of the work. This common task is done to hang pipes, ducts and trays and is performed by construction workers in the electrical, pipe fitting, sheet metal, ironwork and carpentry trades. In this project, alternative devices for overhead drilling were developed in order to reduce the high shoulder loads. The design premise for the alternative devices was adopted from interventions developed on construction sites. These devices were evaluated for usability, productivity, and fatigue in two rounds of testing by 30 construction workers performing their usual overhead drilling. After each round of testing the device designs were modified based on feedback. The final design was associated with much less arm fatigue but similar productivity compared to the usual method for overhead drilling. The feedback, design suggestions and field testing by experienced construction workers was vital to the successful development of these devices. Field testing were done with real tasks, in diverse field settings, with subjects familiar with the task. Multiple rounds of field testing and redesign can significantly improve the safety and usability of new tools. Having experienced workers accessing the new tools can help with determining if and how a new tool is compatible and beneficial to current work practices.

  16. The Overhead System: Production, Implementation and Utilization. 2nd Edition.

    ERIC Educational Resources Information Center

    Smith, Richard E.; Pearson, Jerry D.

    This handbook is designed to help three groups: the administrator who does not have the services of a media specialist, the media specialist who wishes to expand his knowledge or skills, and the classroom teacher who recognizes the value of the overhead as a teaching tool and is looking for practical assistance. Guidelines are provided in 11…

  17. GRINDING ROOM, LOOKING EAST. NOTE OVERHEAD BRIDGE CRANE RIDING ON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    GRINDING ROOM, LOOKING EAST. NOTE OVERHEAD BRIDGE CRANE RIDING ON STEEL RAILS SUPPORTED BY WOODEN BEAMS AND CYCLONE CLASSIFIER IN CENTER. AT RIGHT IS TOP PORTION OF FLASH FLOTATION CELL. - Shenandoah-Dives Mill, 135 County Road 2, Silverton, San Juan County, CO

  18. MOBILE LADLES, ATTACHED TO OVERHEAD RAILS, ARE FILLED AT EITHER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    MOBILE LADLES, ATTACHED TO OVERHEAD RAILS, ARE FILLED AT EITHER THE MALLEABLE FOUNDRY BULL LADLE OR ELECTRIC FURNACE BEFORE THEY TRANSPORT MOLTEN IRON TO MOLDS PREPARED BY DISAMATIC MOLDMAKING MACHINE OR ON ONE OF THE CONVEYORS. - Stockham Pipe & Fittings Company, Malleable Foundry, 4000 Tenth Avenue North, Birmingham, Jefferson County, AL

  19. The Overhead Projector and the Teacher of English in Brazil.

    ERIC Educational Resources Information Center

    Funck, Elvio Antonio

    This paper presents arguments for the consistent use of modern audiovisual aids in English classes, not as a complementary device, but as a fundamental aid. The intention of the thesis is to: (1) show that the overhead projector can be used to help students develop the four language skills; and (2) encourage English teachers, particularly in…

  20. Dissolving Carboxylic Acids and Primary Amines on the Overhead Projector

    ERIC Educational Resources Information Center

    Solomon, Sally D.; Rutkowsky, Susan A.

    2010-01-01

    Liquid carboxylic acids (or primary amines) with limited solubility in water are dissolved by addition of aqueous sodium hydroxide (or hydrochloric acid) on the stage of an overhead projector using simple glassware and very small quantities of chemicals. This effective and colorful demonstration can be used to accompany discussions of the…

  1. DETAIL OVERHEAD VIEW OF SECONDARY ORE BIN, CONVEYOR PLATFORM TRAM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DETAIL OVERHEAD VIEW OF SECONDARY ORE BIN, CONVEYOR PLATFORM TRAM TRESTLE, AND LOADING PLATFORM, LOOKING SOUTHWEST. THE HOLE IN THE ORE BIN FLOOR CAN BE SEEN, AND BALL MILL FOUNDATION AT LOWER LEFT CORNER. SEE CA-291-13 FOR IDENTICAL B&W NEGATIVE. - Keane Wonder Mine, Park Route 4 (Daylight Pass Cutoff), Death Valley Junction, Inyo County, CA

  2. View, from south showing verticals, diagonals, and overhead bracing of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View, from south showing verticals, diagonals, and overhead bracing of south span Pratt through trusses, south portal of north span, pipe rails and posts, and concrete deck with bituminous wearing surface - Castle Garden Bridge, Township Route 343 over Bennetts Branch of Sinnemahoning Creek, Driftwood, Cameron County, PA

  3. Oblique view to the northwest detailing four overhead rolling doors ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Oblique view to the northwest detailing four overhead rolling doors on the northeast elevation - Over-the-Horizon Backscatter Radar Network, Mountain Home Air Force Operations Building, On Desert Street at 9th Avenue Mountain Home Air Force Base, Mountain Home, Elmore County, ID

  4. Overhead Projector Demonstrations: Some Ideas from the Past.

    ERIC Educational Resources Information Center

    Kolb, Doris

    1987-01-01

    Describes nine chemistry demonstrations that can be done using an overhead projector. Includes demonstrations on common ion effect, crystal formation from supersaturated solutions, making iron positive with nitric acid, optical activity, carbon dioxide in human breath, amphoteric hydroxides, the surface tension of mercury, and natural acid-base…

  5. 13. Interior view, grain tanks (bins). Barrel view of overhead ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Interior view, grain tanks (bins). Barrel view of overhead (fill) conveyor gallery bridge extending through tops of tanks just below roofs. Grain tripper straddles belt conveyor at mid-view. - Saint Anthony Elevator No. 3, 620 Malcom Avenue, Southeast, Minneapolis, Hennepin County, MN

  6. 5. Overhead trackandpulley system used to haul materials stored in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Overhead track-and-pulley system used to haul materials stored in stock bins under Jones Street to the Tender Frame Shop. - Central of Georgia Railway, Savannah Repair Shops & Terminal Facilities, Tender Frame Shop, Bounded by West Broad, Jones, West Boundary & Hull Streets, Savannah, Chatham County, GA

  7. Communication overhead on the Intel iPSC-860 hypercube

    NASA Technical Reports Server (NTRS)

    Bokhari, Shahid H.

    1990-01-01

    Experiments were conducted on the Intel iPSC-860 hypercube in order to evaluate the overhead of interprocessor communication. It is demonstrated that: (1) contrary to popular belief, the distance between two communicating processors has a significant impact on communication time, (2) edge contention can increase communication time by a factor of more than 7, and (3) node contention has no measurable impact.

  8. Prevalence of Scapular Dyskinesis in Overhead and Nonoverhead Athletes

    PubMed Central

    Burn, Matthew B.; McCulloch, Patrick C.; Lintner, David M.; Liberman, Shari R.; Harris, Joshua D.

    2016-01-01

    Background: Scapular dyskinesis, or abnormal dynamic scapular control, is a condition that is commonly associated with shoulder pathology but is also present in asymptomatic individuals. Literature varies on whether it represents a cause or symptom of shoulder pathology, but it is believed to be a risk factor for further injury. Clinical identification focuses on visual observation and examination maneuvers. Treatment of altered scapular motion has been shown to improve shoulder symptoms. It is thought to be more common in overhead athletes due to their reliance on unilateral upper extremity function but the incidence within nonoverhead athletes is unknown. Hypothesis: Overhead athletes will have a greater prevalence of scapular dyskinesis when compared with nonoverhead athletes. Study Design: Systematic review; Level of evidence, 3. Methods: After PROSPERO registration, a systematic review was performed using PRISMA guidelines through the PubMed database looking for studies published before October 2014. All studies containing the search terms scapular, scapulothoracic, dyskinesis, dyskinesia, shoulder athlete, or overhead athlete were included. Studies that did not include prevalence data for scapular dyskinesis were excluded. Study methodological quality was evaluated using the modified Coleman methodology score. Descriptive statistics and 2-proportion 2-tailed z-tests were used to compare the reported prevalence of scapular dyskinesis between overhead and nonoverhead athletes. Results: Twelve studies were analyzed including 1401 athletes (1257 overhead and 144 nonoverhead; mean age, 24.4 ± 7.1 years; 78% men). All the studies were evidence level 2 (33%) or level 3 (67%). The reported prevalence of scapular dyskinesis was significantly (P < .0001) higher in overhead athletes (61%) compared with nonoverhead athletes (33%). Conclusion: Scapular dyskinesis was found to have a greater reported prevalence (61%) in overhead athletes compared with nonoverhead athletes

  9. 30 CFR 75.1003 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 75.1003 Section 75.1003... Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and...

  10. 30 CFR 77.1802 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 77.1802 Section 77.1802... Wires and Trolley Feeder Wires § 77.1802 Insulation of trolley wires, trolley feeder wires and bare...

  11. 30 CFR 75.1003 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 75.1003 Section 75.1003... Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and...

  12. 30 CFR 77.1802 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 77.1802 Section 77.1802... Wires and Trolley Feeder Wires § 77.1802 Insulation of trolley wires, trolley feeder wires and bare...

  13. 30 CFR 75.1003 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 75.1003 Section 75.1003... Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and...

  14. 30 CFR 75.1003 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 75.1003 Section 75.1003... Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and...

  15. 30 CFR 77.1802 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 77.1802 Section 77.1802... Wires and Trolley Feeder Wires § 77.1802 Insulation of trolley wires, trolley feeder wires and bare...

  16. 30 CFR 77.1802 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 77.1802 Section 77.1802... Wires and Trolley Feeder Wires § 77.1802 Insulation of trolley wires, trolley feeder wires and bare...

  17. 30 CFR 77.1802 - Insulation of trolley wires, trolley feeder wires and bare signal wires; guarding of trolley...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... wires and bare signal wires; guarding of trolley wires and trolley feeder wires. 77.1802 Section 77.1802... Wires and Trolley Feeder Wires § 77.1802 Insulation of trolley wires, trolley feeder wires and bare..., and bare signal wires shall be adequately guarded: (a) At all points where men are required to work or...

  18. Low-altitude overhead imagery acquisition pre- and post-NPE

    SciTech Connect

    Pickles, W.L.; Shines, J.E.; Hawley, D.L.

    1994-12-31

    We have successfully acquired all the planned overhead imagery (OHI) of the Non-Proliferation Experiment (NPE). The data set is very large and complete. Image mosaics of the area around the NPE Ground Zero (GZ) were taken at 37 12.6948N by 116 12 35.496W on top of Rainier Mesa in Areas 12 at NTS. The data were taken from a total of eight overflights on six different days. Preliminary analysis of the thermal infrared, 8-12.5-micron scanner band, taken before and after the NPE, shows some low-emission effects in virgin soil after the NPE. These effects could be due to the acceleration of the surface caused by NPE. Preliminary analysis of the visible high-resolution color RC-30 photography shows the senescence of oak leaves in an areas of 2 km around GZ. Several other groups also independently observed this phenomenon when they returned to the mesa on Friday morning, 48 hours after the NPE. Detailed study of the photography and the scanner data will be necessary to map the actual aerial extent of the senescence. If the effect is proven to be limited to the area around GZ, then we will have supporting evidence that we have actually observed shock-induced premature senescence of oak leaves. Such overhead imagery could be used to help reduce the search area during an on-site inspection as part of the Comprehensive Test Ban Treaty verification activities.

  19. Moeglichkeiten individualisierter Arbeit mit Hilfe des Overhead-Projektors (Possibilities for Individualized Work with the Aid of the Overhead Projector)

    ERIC Educational Resources Information Center

    Budde, Ulrich

    1975-01-01

    Individualized work in teaching English is highly desirable, and the overhead projector is particularly useful in such work. Three examples of its possibilities are given: Dialog treatment, working with basic ("kernel") texts, and comparison of the simple present, simple past and present perfect tenses. (Text is in German.) (IFS/WGA)

  20. Thin wire pointing method

    NASA Technical Reports Server (NTRS)

    Green, G.; Mattauch, R. J. (Inventor)

    1983-01-01

    A method is described for forming sharp tips on thin wires, in particular phosphor bronze wires of diameters such as one-thousandth inch used to contact micron size Schottky barrier diodes, which enables close control of tip shape and which avoids the use of highly toxic solutions. The method includes dipping an end of a phosphor bronze wire into a dilute solution of sulfamic acid and applying a current through the wire to electrochemically etch it. The humidity in the room is controlled to a level of less than 50%, and the voltage applied between the wire and another electrode in the solutions is a half wave rectified voltage. The current through the wire is monitored, and the process is stopped when the current falls to a predetermined low level.

  1. Sintered wire annode

    DOEpatents

    Falce, Louis R.; Ives, R. Lawrence

    2007-12-25

    A plurality of high atomic number wires are sintered together to form a porous rod that is parted into porous disks which will be used as x-ray targets. A thermally conductive material is introduced into the pores of the rod, and when a stream of electrons impinges on the sintered wire target and generates x-rays, the heat generated by the impinging x-rays is removed by the thermally conductive material interspersed in the pores of the wires.

  2. Wire-inhomogeneity detector

    DOEpatents

    Gibson, G.H.; Smits, R.G.; Eberhard, P.H.

    1982-08-31

    A device for uncovering imperfections in electrical conducting wire, particularly superconducting wire, by detecting variations in eddy currents. Eddy currents effect the magnetic field in a gap of an inductor, contained in a modified commercial ferrite core, through which the wire being tested is passed. A small increase or decrease in the amount of conductive material, such as copper, in a fixed cross section of wire will unbalance a bridge used to measure the impedance of the inductor, tripping a detector and sounding an alarm.

  3. Concealed wire tracing apparatus

    DOEpatents

    Kronberg, J.W.

    1994-05-31

    An apparatus and method that combines a signal generator and a passive signal receiver to detect and record the path of partially or completely concealed electrical wiring without disturbing the concealing surface is disclosed. The signal generator applies a series of electrical pulses to the selected wiring of interest. The applied pulses create a magnetic field about the wiring that can be detected by a coil contained within the signal receiver. An audible output connected to the receiver and driven by the coil reflects the receivers position with respect to the wiring. The receivers audible signal is strongest when the receiver is directly above the wiring and the long axis of the receivers coil is parallel to the wiring. A marking means is mounted on the receiver to mark the location of the wiring as the receiver is directed over the wiring's concealing surface. Numerous marks made on various locations of the concealing surface will trace the path of the wiring of interest. 4 figs.

  4. Weld Wire Investigation Summary

    SciTech Connect

    Cunningham, M.A.

    1999-03-22

    After GTA welding reservoir A production/process prove-in assemblies, X-ray examination detected a lack of sidewall fusion. After examining several possible causes, it was determined that the weld wire filler metal was responsible, particularly the wire cleaning process. The final conclusion was that the filler wire must be abrasively cleaned in a particular manner to perform as required. The abrasive process was incorporated into the wire material specification, ensuring consistency for all reservoir GTA welding at AlliedSignal Federal Manufacturing and Technologies (FM and T).

  5. 1998 wire development workshop proceedings

    SciTech Connect

    1998-04-01

    This report consists of vugraphs of the presentations at the conference. The conference was divided into the following sessions: (1) First Generation Wire Development: Status and Issues; (2) First Generation Wire in Pre-Commercial Prototypes; (3) Second Generation Wire Development: Private Sector Progress and Issues; (4) Second Generation Wire Development: Federal Laboratories; and (5) Fundamental Research Issues for HTS Wire Development.

  6. VIEW SOUTHEASTBUILDING 4 NO. 1 WIRE MILL (1871) WIRE DRAWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW SOUTHEAST-BUILDING 4 NO. 1 WIRE MILL (1871) WIRE DRAWING MACHINE - John A. Roebling's Sons Company & American Steel & Wire Company, South Broad, Clark, Elmer, Mott & Hudson Streets, Trenton, Mercer County, NJ

  7. Ten Suggestions and One Commandment: Using Overhead Projectors in Geography Classrooms.

    ERIC Educational Resources Information Center

    Gersmehl, Philip J.

    1985-01-01

    Suggestions for effective use of overhead projectors include making images large, preparing standard base maps, making lettering clear, presenting only one idea per overhead, keeping things simple, using only half a page for each image, using the overhead as a chalkboard, using color thoughtfully, making symbols bold, and anticipating emergencies.…

  8. 30 CFR 56.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Work or travel on overhead crane bridges. 56... Materials Storage and Handling § 56.16015 Work or travel on overhead crane bridges. No person shall work from or travel on the bridge of an overhead crane unless the bridge is provided with substantial...

  9. 30 CFR 57.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Work or travel on overhead crane bridges. 57... MINES Materials Storage and Handling § 57.16015 Work or travel on overhead crane bridges. No person shall work from or travel on the bridge of an overhead crane unless the bridge is provided with...

  10. 30 CFR 56.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Work or travel on overhead crane bridges. 56... Materials Storage and Handling § 56.16015 Work or travel on overhead crane bridges. No person shall work from or travel on the bridge of an overhead crane unless the bridge is provided with substantial...

  11. 30 CFR 57.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Work or travel on overhead crane bridges. 57... MINES Materials Storage and Handling § 57.16015 Work or travel on overhead crane bridges. No person shall work from or travel on the bridge of an overhead crane unless the bridge is provided with...

  12. 30 CFR 56.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Work or travel on overhead crane bridges. 56... Materials Storage and Handling § 56.16015 Work or travel on overhead crane bridges. No person shall work from or travel on the bridge of an overhead crane unless the bridge is provided with substantial...

  13. 30 CFR 57.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Work or travel on overhead crane bridges. 57... MINES Materials Storage and Handling § 57.16015 Work or travel on overhead crane bridges. No person shall work from or travel on the bridge of an overhead crane unless the bridge is provided with...

  14. 30 CFR 56.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Work or travel on overhead crane bridges. 56... Materials Storage and Handling § 56.16015 Work or travel on overhead crane bridges. No person shall work from or travel on the bridge of an overhead crane unless the bridge is provided with substantial...

  15. 30 CFR 57.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Work or travel on overhead crane bridges. 57... MINES Materials Storage and Handling § 57.16015 Work or travel on overhead crane bridges. No person shall work from or travel on the bridge of an overhead crane unless the bridge is provided with...

  16. 30 CFR 57.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Work or travel on overhead crane bridges. 57... MINES Materials Storage and Handling § 57.16015 Work or travel on overhead crane bridges. No person shall work from or travel on the bridge of an overhead crane unless the bridge is provided with...

  17. 30 CFR 56.16015 - Work or travel on overhead crane bridges.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Work or travel on overhead crane bridges. 56... Materials Storage and Handling § 56.16015 Work or travel on overhead crane bridges. No person shall work from or travel on the bridge of an overhead crane unless the bridge is provided with substantial...

  18. Wire Array Photovoltaics

    NASA Astrophysics Data System (ADS)

    Turner-Evans, Dan

    Over the past five years, the cost of solar panels has dropped drastically and, in concert, the number of installed modules has risen exponentially. However, solar electricity is still more than twice as expensive as electricity from a natural gas plant. Fortunately, wire array solar cells have emerged as a promising technology for further lowering the cost of solar. Si wire array solar cells are formed with a unique, low cost growth method and use 100 times less material than conventional Si cells. The wires can be embedded in a transparent, flexible polymer to create a free-standing array that can be rolled up for easy installation in a variety of form factors. Furthermore, by incorporating multijunctions into the wire morphology, higher efficiencies can be achieved while taking advantage of the unique defect relaxation pathways afforded by the 3D wire geometry. The work in this thesis shepherded Si wires from undoped arrays to flexible, functional large area devices and laid the groundwork for multijunction wire array cells. Fabrication techniques were developed to turn intrinsic Si wires into full p-n junctions and the wires were passivated with a-Si:H and a-SiNx:H. Single wire devices yielded open circuit voltages of 600 mV and efficiencies of 9%. The arrays were then embedded in a polymer and contacted with a transparent, flexible, Ni nanoparticle and Ag nanowire top contact. The contact connected >99% of the wires in parallel and yielded flexible, substrate free solar cells featuring hundreds of thousands of wires. Building on the success of the Si wire arrays, GaP was epitaxially grown on the material to create heterostructures for photoelectrochemistry. These cells were limited by low absorption in the GaP due to its indirect bandgap, and poor current collection due to a diffusion length of only 80 nm. However, GaAsP on SiGe offers a superior combination of materials, and wire architectures based on these semiconductors were investigated for multijunction

  19. Electromyographic analysis of an ergonomic risk factor: overhead work.

    PubMed

    Kinali, Gulsah; Kara, Sadık; Yıldırım, Mustafa Selman

    2016-06-01

    [Purpose] Repetitive upper extremity exercises result in overuse injuries. However, it is challenging to identify the specific causative movements. This study evaluated the effects of different shoulder positions on grip and electrophysiological activity of upper extremity muscles. [Subjects and Methods] Forty subjects ranging from 18 and 30 years of age were analyzed. Surface electromyography and hand grip strength were measured during a range of shoulder exercises and numerous signal processing methods were applied. [Results] The maximum electromyographic activity intensity was observed in the wrist extensors at various angles. Deltoid activity rose significantly during shoulder flexion. [Conclusion] Overhead work causes shoulder muscle fatigue and prevents effective hand function, which affects occupational health and efficiency. Overhead work involves a hazardous position and decreases efficiency. Ergonomic solutions should be developed to prevent muscle fatigue and decreased grip force.

  20. Electromyographic analysis of an ergonomic risk factor: overhead work

    PubMed Central

    Kinali, Gulsah; Kara, Sadık; Yıldırım, Mustafa Selman

    2016-01-01

    [Purpose] Repetitive upper extremity exercises result in overuse injuries. However, it is challenging to identify the specific causative movements. This study evaluated the effects of different shoulder positions on grip and electrophysiological activity of upper extremity muscles. [Subjects and Methods] Forty subjects ranging from 18 and 30 years of age were analyzed. Surface electromyography and hand grip strength were measured during a range of shoulder exercises and numerous signal processing methods were applied. [Results] The maximum electromyographic activity intensity was observed in the wrist extensors at various angles. Deltoid activity rose significantly during shoulder flexion. [Conclusion] Overhead work causes shoulder muscle fatigue and prevents effective hand function, which affects occupational health and efficiency. Overhead work involves a hazardous position and decreases efficiency. Ergonomic solutions should be developed to prevent muscle fatigue and decreased grip force. PMID:27390448

  1. On-line corrosion control in refinery overhead systems

    SciTech Connect

    Correa, L.A.

    1995-11-01

    Corrosion is one of the great causes of accidents and economic losses in petroleum and petrochemical industries. Crude unit overheads are one of the most corrosion affected parts and large amounts of work and money has been spent on its control and prevention. Thus, new materials, inhibitors and monitoring techniques are constantly under testing in order to improve corrosion prevention and plant reliability. Expert Systems are a rising technology in industrial process monitoring and problem diagnosing. This sort of computer program is developed trying to simulate the human expert intelligent behavior in the task of solving a specific problem. The crude units overhead corrosion control is a hard and time consuming task that seems to be a fruitful field to expert systems application.

  2. Reducing the overhead for quantum computation when noise is biased

    NASA Astrophysics Data System (ADS)

    Webster, Paul; Bartlett, Stephen D.; Poulin, David

    2015-12-01

    We analyze a model for fault-tolerant quantum computation with low overhead suitable for situations where the noise is biased. The basis for this scheme is a gadget for the fault-tolerant preparation of magic states that enable universal fault-tolerant quantum computation using only Clifford gates that preserve the noise bias. We analyze the distillation of |T > -type magic states using this gadget at the physical level, followed by concatenation with the 15-qubit quantum Reed-Muller code, and comparing our results with standard constructions. In the regime where the noise bias (rate of Pauli Z errors relative to other single-qubit errors) is greater than a factor of 10, our scheme has lower overhead across a broad range of relevant noise rates.

  3. MICROINSTABILITY OF THE SHOULDER IN THE OVERHEAD ATHLETE

    PubMed Central

    Curtis, Alan S.

    2013-01-01

    The overhead throwing athlete is an extremely challenging patient in sports medicine. The repetitive microtraumatic stresses and extreme ranges of motion observed within the athlete’s shoulder joint complex during the throwing motion constantly place the athlete at risk for injury. While gross instability of the shoulder is possible, microinstability is seen far more frequently and is associated with a variety of different pathologies, including rotator cuff tendonitis, internal impingement, and labral lesions. Treatment of the overhead athlete requires the understanding of several principles based on the unique physical characteristics of this type of athlete and the demands placed upon the static stabilizing structures during the act of throwing. The purpose of this paper is to describe these principles and incorporate them into in a multi‐phase progressive rehabilitation program designed to prevent injuries and rehabilitate the injured athlete, both non‐operatively and postoperatively. PMID:24175140

  4. 30 CFR 57.12069 - Lightning protection for telephone wires and ungrounded conductors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Lightning protection for telephone wires and... AND NONMETAL MINES Electricity Surface Only § 57.12069 Lightning protection for telephone wires and... resistance grounding medium on the surface and shall be separated from neutral grounds by a distance of not...

  5. 4. Overhead view showing the 1927 bridge (narrow bridgeleft side) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Overhead view showing the 1927 bridge (narrow bridge-left side) and 1959 bridge (right side) across Carquinez Strait. Town of Crockett is on south bank (bottom of image). C&H sugar factory is along the strait to the east (right) side of the 1959 bridge. The toll plaza is at the top of the image on the 1959 bridge side. - Carquinez Bridge, Spanning Carquinez Strait at Interstate 80, Vallejo, Solano County, CA

  6. Glutinous Water. Protecting Vertical and Overhead Surfaces from Fire Spread

    DTIC Science & Technology

    1994-02-28

    DISTRIBUTION CODE Approved for public release; distribution unlimited. 13. ABSTRACT (Maximum 200 words ) Most of the water used in firefighting is not only...Naval Research Laboratory AD-A277 280 Washington, DC 20375-5320 NRL/MR/6180--94-7431 DTIC S ELECTE MAR 24 19941 Glutinous Water F Protecting Vertical...TYPE AND DATES COVERED February 28, 1994 4. TITLE AND SUBTITLE 5. FUNDING NUMBERS Glutinous Water Protecting Vertical and Overhead Surfaces From Fire

  7. Overhead-Performance Tradeoffs in Distributed Wireless Networks

    DTIC Science & Technology

    2015-06-26

    comparison, we have included a trendline for the rate distortion function plus a bit. Key Publications & Abstracts • B. D. Boyle , J. M. Walsh, and S. Weber...IID. • Jie Ren, Bradford Boyle , Gwanmo Ku, Steven Weber, John MacLaren Walsh, Overhead Performance Tradeoffs A Resource Allocation Perspective, IEEE...Bradford D. Boyle , Jie Ren, John MacLaren Walsh, and Steven Weber, Interactive Scalar Quantization for Distributed Extremization, IEEE Trans. Signal

  8. Passive optical sensor for lightning detection on overhead power lines

    NASA Astrophysics Data System (ADS)

    Rosolem, J. B.; Barbosa, C. F.; Florídia, C.; Bezerra, E. L.

    2009-10-01

    In this work we present the results of a passive optical sensor for monitoring lightning strikes on overhead power lines, which can also be used for several other applications. The optic sensor is very simple and cheap and basically consists in the use of an antenna connected directly to a semiconductor laser. No batteries and solar panels are necessary to implement this sensing system in power lines towers. It was tested in laboratory and showed a good performance.

  9. An estimation of lightning insulation level of overhead distribution lines

    SciTech Connect

    Jacob, P.B.; Grzybowski, S. . Dept. of Electrical Engineering); Ross, E.R. )

    1991-01-01

    This paper develops a practical procedure for determining the total insulation strength of multiple or composite insulations most commonly used in the design of overhead distribution lines. Laboratory test data were obtained on a wide range of combinations and configurations utilizing porcelain, polymer and fiberglass insulators as well as wood poles and wood crossarms. Data were obtained for both dry and wet conditions with positive and negative polarities of the impulses.

  10. Contract Overhead Reduction Across the Department of Defense

    DTIC Science & Technology

    2016-02-16

    strategy, a business adds a portion or representative share of overhead costs to the sales price of items or overall price of services in order to...exceeding specified standards or goals.”5 There are two broad category types of contracts – fixed price and cost reimbursement contracts. In the first...category, in the cases of a product having stable build characteristics, well-known supply chains, or a longer history of product pricing , then the

  11. Commercial and Industrial Wiring.

    ERIC Educational Resources Information Center

    Kaltwasser, Stan; Flowers, Gary

    This module is the third in a series of three wiring publications, includes additional technical knowledge and applications required for job entry in the commercial and industrial wiring trade. The module contains 15 instructional units that cover the following topics: blueprint reading and load calculations; tools and equipment; service;…

  12. Imagination Visualized in Wire.

    ERIC Educational Resources Information Center

    Skophammer, Karen

    2003-01-01

    Describes an art lesson achieved with a Very Special Artist (VSA) in residence for sixth- and seventh-grade students in which they created wire sculptures. Discusses how the VSA taught the students. Includes a list of art materials and characteristics of wire. (CMK)

  13. Imagination Visualized in Wire.

    ERIC Educational Resources Information Center

    Skophammer, Karen

    2003-01-01

    Describes an art lesson achieved with a Very Special Artist (VSA) in residence for sixth- and seventh-grade students in which they created wire sculptures. Discusses how the VSA taught the students. Includes a list of art materials and characteristics of wire. (CMK)

  14. 2016 MOST WIRED.

    PubMed

    Barr, Paul; Butcher, Lola; Hoppszallern, Suzanna

    2016-07-01

    This year's IT survey shows that hospitals are aggressively fighting cyber crime and looking for ways to use data to help in the transition to value-based care. Find out who made the 2016 lists of Most Wired, Most Advanced, Most Improved and Most Wired-Small and Rural.

  15. Modeling the Virtual Machine Launching Overhead under Fermicloud

    SciTech Connect

    Garzoglio, Gabriele; Wu, Hao; Ren, Shangping; Timm, Steven; Bernabeu, Gerard; Noh, Seo-Young

    2014-11-12

    FermiCloud is a private cloud developed by the Fermi National Accelerator Laboratory for scientific workflows. The Cloud Bursting module of the FermiCloud enables the FermiCloud, when more computational resources are needed, to automatically launch virtual machines to available resources such as public clouds. One of the main challenges in developing the cloud bursting module is to decide when and where to launch a VM so that all resources are most effectively and efficiently utilized and the system performance is optimized. However, based on FermiCloud’s system operational data, the VM launching overhead is not a constant. It varies with physical resource (CPU, memory, I/O device) utilization at the time when a VM is launched. Hence, to make judicious decisions as to when and where a VM should be launched, a VM launch overhead reference model is needed. The paper is to develop a VM launch overhead reference model based on operational data we have obtained on FermiCloud and uses the reference model to guide the cloud bursting process.

  16. Life cycle assessment of overhead and underground primary power distribution.

    PubMed

    Bumby, Sarah; Druzhinina, Ekaterina; Feraldi, Rebe; Werthmann, Danae; Geyer, Roland; Sahl, Jack

    2010-07-15

    Electrical power can be distributed in overhead or underground systems, both of which generate a variety of environmental impacts at all stages of their life cycles. While there is considerable literature discussing the trade-offs between both systems in terms of aesthetics, safety, cost, and reliability, environmental assessments are relatively rare and limited to power cable production and end-of-life management. This paper assesses environmental impacts from overhead and underground medium voltage power distribution systems as they are currently built and managed by Southern California Edison (SCE). It uses process-based life cycle assessment (LCA) according to ISO 14044 (2006) and SCE-specific primary data to the extent possible. Potential environmental impacts have been calculated using a wide range of midpoint indicators, and robustness of the results has been investigated through sensitivity analysis of the most uncertain and potentially significant parameters. The studied underground system has higher environmental impacts in all indicators and for all parameter values, mostly due to its higher material intensity. For both systems and all indicators the majority of impact occurs during cable production. Promising strategies for impact reduction are thus cable failure rate reduction for overhead and cable lifetime extension for underground systems.

  17. SRTM is removed from Endeavour's payload bay to ease wiring inspections

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Orbiter Processing Facility, workers observe as an overhead crane lowers the Shuttle Radar Topography Mission (SRTM) into a payload canister. The payload on mission STS-99, SRTM was removed from orbiter Endeavour's payload bay to allow technicians access to the orbiter's midbody for planned wiring inspections. The entire fleet of orbiters is being inspected for wiring abrasions after the problem was first discovered in Columbia. Shuttle managers are reviewing several manifest options and could establish new target launch dates for the balance of 1999 next week. Shuttle Endeavour currently remains slated for launch in early October.

  18. SRTM is removed from Endeavour's payload bay to ease wiring inspections

    NASA Technical Reports Server (NTRS)

    1999-01-01

    Workers inside orbiter Endeavour's payload bay observe as an overhead crane maneuvers to lift the Shuttle Radar Topography Mission (SRTM) for its transfer out of the orbiter to a payload canister. The payload on mission STS-99, SRTM is being removed to allow technicians access to the orbiter's midbody for planned wiring inspections. Endeavour is in the Orbiter Processing Facility. The entire fleet of orbiters is being inspected for wiring abrasions after the problem was first discovered in Columbia. Shuttle managers are reviewing several manifest options and could establish new target launch dates for the balance of 1999 next week. Shuttle Endeavour currently remains slated for launch in early October.

  19. SRTM is removed from Endeavour's payload bay to ease wiring inspections

    NASA Technical Reports Server (NTRS)

    1999-01-01

    Workers inside orbiter Endeavour's payload bay observe as an overhead crane maneuvers to lift the Shuttle Radar Topography Mission (SRTM) for its transfer out of the orbiter to a payload canister. The payload on mission STS-99, SRTM is being removed to allow technicians access to the orbiter's midbody for planned wiring inspections. Endeavour is in the Orbiter Processing Facility. The entire fleet of orbiters is being inspected for wiring abrasions after the problem was first discovered in Columbia. Shuttle managers are reviewing several manifest options and could establish new target launch dates for the balance of 1999 next week. Shuttle Endeavour currently remains slated for launch in early October.

  20. Characterization of vertical electric fields and associated voltages induced on a overhead power line from close artificially initiated lightning

    NASA Astrophysics Data System (ADS)

    Rubinstein, Marcos; Uman, Martin A.; Thomson, Ewen M.; Medelius, Pedro J.

    1991-08-01

    Measurements were characterized of simultaneous vertical electric fields and voltages induced at both ends of a 448 m overhead power line by artificially initiated lightning return strokes. The lightning discharges struck ground about 20 m from one end of the line. The measured line voltages could be grouped into two categories: those in which multiple, similarly shaped, evenly spaced pulses were observed, which are called oscillatory; and those dominated by a principal pulse with subsidiary oscillations of much smaller amplitude, which are called impulsive. Voltage amplitudes range from tens of kilovolts for oscillatory voltages to hundreds of kilovolts for impulsive voltages.

  1. Characterization of vertical electric fields and associated voltages induced on a overhead power line from close artificially initiated lightning

    NASA Technical Reports Server (NTRS)

    Rubinstein, Marcos; Uman, Martin A.; Thomson, Ewen M.; Medelius, Pedro J.

    1991-01-01

    Measurements were characterized of simultaneous vertical electric fields and voltages induced at both ends of a 448 m overhead power line by artificially initiated lightning return strokes. The lightning discharges struck ground about 20 m from one end of the line. The measured line voltages could be grouped into two categories: those in which multiple, similarly shaped, evenly spaced pulses were observed, which are called oscillatory; and those dominated by a principal pulse with subsidiary oscillations of much smaller amplitude, which are called impulsive. Voltage amplitudes range from tens of kilovolts for oscillatory voltages to hundreds of kilovolts for impulsive voltages.

  2. Simple circuit monitors "third wire" in ac lines

    NASA Technical Reports Server (NTRS)

    Kojima, T. T.; Stuck, D. E.

    1980-01-01

    Device detects interruption of ground connection in three-wire electrical equipment and shuts off ac power to prevent shock hazard. Silicon-controlled rectifiers detect floating ground, and deenergize optoelectric relays thereby breaking power connections. Circuit could be incorporated into hand tools, appliances, and other electrical equipment.

  3. Simple circuit monitors "third wire" in ac lines

    NASA Technical Reports Server (NTRS)

    Kojima, T. T.; Stuck, D. E.

    1980-01-01

    Device detects interruption of ground connection in three-wire electrical equipment and shuts off ac power to prevent shock hazard. Silicon-controlled rectifiers detect floating ground, and deenergize optoelectric relays thereby breaking power connections. Circuit could be incorporated into hand tools, appliances, and other electrical equipment.

  4. Next Generation Wiring

    NASA Technical Reports Server (NTRS)

    Medelius, Petro; Jolley, Scott; Fitzpatrick, Lilliana; Vinje, Rubiela; Williams, Martha; Clayton, LaNetra; Roberson, Luke; Smith, Trent; Santiago-Maldonado, Edgardo

    2007-01-01

    Wiring is a major operational component on aerospace hardware that accounts for substantial weight and volumetric space. Over time wire insulation can age and fail, often leading to catastrophic events such as system failure or fire. The next generation of wiring must be reliable and sustainable over long periods of time. These features will be achieved by the development of a wire insulation capable of autonomous self-healing that mitigates failure before it reaches a catastrophic level. In order to develop a self-healing insulation material, three steps must occur. First, methods of bonding similar materials must be developed that are capable of being initiated autonomously. This process will lead to the development of a manual repair system for polyimide wire insulation. Second, ways to initiate these bonding methods that lead to materials that are similar to the primary insulation must be developed. Finally, steps one and two must be integrated to produce a material that has no residues from the process that degrades the insulating properties of the final repaired insulation. The self-healing technology, teamed with the ability to identify and locate damage, will greatly improve reliability and safety of electrical wiring of critical systems. This paper will address these topics, discuss the results of preliminary testing, and remaining development issues related to self-healing wire insulation.

  5. Orbiter Kapton wire operational requirements and experience

    NASA Technical Reports Server (NTRS)

    Peterson, R. V.

    1994-01-01

    The agenda of this presentation includes the Orbiter wire selection requirements, the Orbiter wire usage, fabrication and test requirements, typical wiring installations, Kapton wire experience, NASA Kapton wire testing, summary, and backup data.

  6. Orbiter Kapton wire operational requirements and experience

    NASA Astrophysics Data System (ADS)

    Peterson, R. V.

    1994-09-01

    The agenda of this presentation includes the Orbiter wire selection requirements, the Orbiter wire usage, fabrication and test requirements, typical wiring installations, Kapton wire experience, NASA Kapton wire testing, summary, and backup data.

  7. Breakdown dynamics of electrically exploding thin metal wires in vacuum

    NASA Astrophysics Data System (ADS)

    Sarkisov, G. S.; Caplinger, J.; Parada, F.; Sotnikov, V. I.

    2016-10-01

    Using a two-frame intensified charge coupled device (iCCD) imaging system with a 2 ns exposure time, we observed the dynamics of voltage breakdown and corona generation in experiments of fast ns-time exploding fine Ni and stainless-steel (SS) wires in a vacuum. These experiments show that corona generation along the wire surface is subjected to temporal-spatial inhomogeneity. For both metal wires, we observed an initial generation of a bright cathode spot before the ionization of the entire wire length. This cathode spot does not expand with time. For 25.4 μm diameter Ni and SS wire explosions with positive polarity, breakdown starts from the ground anode and propagates to the high voltage cathode with speeds approaching 3500 km/s or approximately one percent of light speed.

  8. Thermal Model of a Current-Carrying Wire in a Vacuum

    NASA Technical Reports Server (NTRS)

    Border, James

    2006-01-01

    A computer program implements a thermal model of an insulated wire carrying electric current and surrounded by a vacuum. The model includes the effects of Joule heating, conduction of heat along the wire, and radiation of heat from the outer surface of the insulation on the wire. The model takes account of the temperature dependences of the thermal and electrical properties of the wire, the emissivity of the insulation, and the possibility that not only can temperature vary along the wire but, in addition, the ends of the wire can be thermally grounded at different temperatures. The resulting second-order differential equation for the steady-state temperature as a function of position along the wire is highly nonlinear. The wire is discretized along its length, and the equation is solved numerically by use of an iterative algorithm that utilizes a multidimensional version of the Newton-Raphson method.

  9. Adult cancers near high-voltage overhead power lines.

    PubMed

    Elliott, Paul; Shaddick, Gavin; Douglass, Margaret; de Hoogh, Kees; Briggs, David J; Toledano, Mireille B

    2013-03-01

    Extremely low-frequency magnetic fields are designated as possibly carcinogenic in humans, based on an epidemiologic association with childhood leukemia. Evidence for associations with adult cancers is weaker and inconsistent. We conducted a case-control study to investigate risks of adult cancers in relation to distance and extremely low-frequency magnetic fields from high-voltage overhead power lines using National Cancer Registry Data in England and Wales, 1974-2008. The study included 7823 leukemia, 6781 brain/central nervous system cancers, 9153 malignant melanoma, 29,202 female breast cancer cases, and 79,507 controls frequency-matched on year and region (three controls per case except for female breast cancer, one control per case) 15-74 years of age living within 1000 m of a high-voltage overhead power line. There were no clear patterns of excess risk with distance from power lines. After adjustment for confounders (age, sex [except breast cancer], deprivation, rurality), for distances closest to the power lines (0-49 m) compared with distances 600-1000 m, odds ratios (ORs) ranged from 0.82 (95% confidence interval = 0.61-1.11; 66 cases) for malignant melanoma to 1.22 (0.88-1.69) for brain/central nervous system cancer. We observed no meaningful excess risks and no trends of risk with magnetic field strength for the four cancers examined. In adjusted analyses at the highest estimated field strength, ≥1000 nanotesla (nT), compared with <100 nT, ORs ranged from 0.68 (0.39-1.17) for malignant melanoma to 1.08 (0.77-1.51) for female breast cancer. Our results do not support an epidemiologic association of adult cancers with residential magnetic fields in proximity to high-voltage overhead power lines.

  10. Contamination source review for Building E3613, Edgewood Area, Aberdeen Proving Ground, Maryland

    SciTech Connect

    Billmark, K.A.; Emken, M.E.; Muir-Ploense, K.L.

    1995-09-01

    This report was prepared by Argonne National Laboratory (ANL) to document the results of a contamination source review of Building E3613 at the Aberdeen Proving Ground (APG) in Maryland. The report may be used to assist the U.S. Army in planning for the future use or disposition of this building, The review included a historical records search, physical inspection, photographic documentation, geophysical investigation, and collection of air samples. The field investigations were performed by ANL during 1994 and 1995. Building E3613 (APG designation) is located in the Canal Creek Area of APG. The building was constructed in 1954 for use as a change house, office, and storage building in support of the white phosphorus smoke program. The building has not been used since 1988. During an inspection in 1988, asbestos was listed as the only potential contaminant. The physical inspection and photographic documentation of Building E3613 were completed in November 1994. At the time of the inspection, Building E3613 was inactive and in disrepair. The single-story, rectangular structure contains five rooms and measures 16 ft 2 in. by 32 ft. The building is wood frame construction with a gabled roof. The exterior walls and roof are constructed of wood covered with asphalt sheeting. The building rests on a concrete foundation. The interior walls are 6-in.-thick wood, and the ceiling is assumed to be white drywall nailed to a wooden frame. Overhead steam pipes supported by vertical pipes traverse the area. Two concrete footings for guy wires that support the overhead steam pipes are located north and west of the building. Four additional vertical pipes exit the ground east of the building.

  11. Improved Overhead Accounting in the NLC Main Linac

    SciTech Connect

    Tenenbaum, P.

    2004-06-10

    The NLC main linac contains 1,116 RF power units, of which 5% are considered ''spares'' for replacement of failed power units, make-up of the energy gain during an RF breakdown, and energy feedback. A more careful accounting for the effects of beam loading indicates that the NLC can operate with less BNS overhead and a smaller mean phase offset than was originally specified, and that as a consequence the total number of spares is actually about 7.9% of the total.

  12. Path-sensitive analysis for reducing rollback overheads

    DOEpatents

    O'Brien, John K.P.; Wang, Kai-Ting Amy; Yamashita, Mark; Zhuang, Xiaotong

    2014-07-22

    A mechanism is provided for path-sensitive analysis for reducing rollback overheads. The mechanism receives, in a compiler, program code to be compiled to form compiled code. The mechanism divides the code into basic blocks. The mechanism then determines a restore register set for each of the one or more basic blocks to form one or more restore register sets. The mechanism then stores the one or more register sets such that responsive to a rollback during execution of the compiled code. A rollback routine identifies a restore register set from the one or more restore register sets and restores registers identified in the identified restore register set.

  13. SHOULDER MUSCLE IMBALANCE AND SUBACROMIAL IMPINGEMENT SYNDROME IN OVERHEAD ATHLETES

    PubMed Central

    2011-01-01

    Subacromial impingement is a frequent and painful condition among athletes, particularly those involved in overhead sports such as baseball and swimming. There are generally two types of subacromial impingement: structural and functional. While structural impingement is caused by a physical loss of area in the subacromial space due to bony growth or inflammation, functional impingement is a relative loss of subacromial space secondary to altered scapulohumeral mechanics resulting from glenohumeral instability and muscle imbalance. The purpose of this review is to describe the role of muscle imbalance in subacromial impingement in order to guide sports physical therapy evaluation and interventions. PMID:21655457

  14. 88. Overhead view of clear air station site at early ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    88. Overhead view of clear air station site at early stage of construction. View is from south 30 degrees west showing DR 3 in foreground with DR 2 in middle and DR 1 out of view. Official photograph BMEWS Project by unknown photographer, 5 October, 1959, Photographic Services, Riverton, NJ, BMEWS, clear as negative no. A-27. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK

  15. Field evaluation of a modified intervention for overhead drilling.

    PubMed

    Rempel, David; Star, Demetra; Barr, Alan; Blanco, Marco Mendoza; Janowitz, Ira

    2010-04-01

    Drilling holes into concrete or metal ceilings is one of the most physically demanding tasks performed in construction. The work is done overhead with rotary impact hammer drills that weigh up to 40 N. The task is associated with pain and musculoskeletal disorders at the wrist, forearm, shoulder, and back. The mechanism of injury is thought to be the high forces and non-neutral shoulder and wrist postures applied during drilling. Previously, we described a field study of a foot lever and inverted drill press intervention devices that received poor usability ratings compared with the usual method for overhead drilling based on problems with mobility and productivity. Using a participatory intervention model, feedback from construction workers (N = 13) was used to develop a new intervention design that incorporated a wheeled tripod base and a unique method of aligning the drilling column to vertical. A different group of construction workers (N = 23) evaluated usability and fatigue of the new device during their regular overhead drilling in comparison with the usual method. Four of 12 usability ratings were significantly better with the intervention device compared with the usual method. Subjective shoulder fatigue was less with the new intervention (1.1 vs. 3.3; scale 0 to 5; p < 0.001). This difference was supported by objective outcome measures; the mean hand forces during drilling were 26 N with the intervention compared with 245 N with the usual method. The percentage of time with the shoulder flexed or abducted to more than 60 degrees was less with the intervention compared with the usual method (21 vs. 40%; p = 0.007). There was significantly less head extension with the intervention compared with the usual method. There were no significant differences in overall productivity between the two methods. This study demonstrates that a new intervention device for overhead drilling has improved usability and subjective fatigue ratings compared with the usual method

  16. Evaluation of Impingement Syndromes in the Overhead-Throwing Athlete

    PubMed Central

    Jobe, Christopher M.; Coen, Michael J.; Screnar, Pat

    2000-01-01

    Objective: We outline impingement entities, describe the history and physical examination, and provide an overview of treatment beyond that routinely used in glenohumeral and scapulothoracic dysfunction. Background: In the athlete, pain and dysfunction due to excessive overhead use or abnormal positioning of the shoulder is common and can result from multiple etiologies, including impingement syndromes. Primary, secondary, internal, and coracoid impingement have all been described. Description: These entities will be discussed, including pathology, evaluation, and treatment. Clinical Advantages: Incorporating a systematic evaluation and treatment of impingement syndromes optimizes care for the patient with shoulder pain. PMID:16558643

  17. Active Ground Optical Remote Sensing for Improved Monitoring of Seedling Stress in Nurseries

    USDA-ARS?s Scientific Manuscript database

    Active ground optical remote sensing (AGORS) devices mounted on overhead irrigation booms could help to improve seedling quality by autonomously monitoring seedling stress. In contrast to traditionally used passive optical sensors, AGORS devices operate independently of ambient light conditions and ...

  18. Superconducting wire manufactured

    NASA Astrophysics Data System (ADS)

    Fu, Yuexian; Sun, Yue; Xu, Shiming; Peng, Ying

    1985-10-01

    The MF Nb/Cu Extrusion Tube Method was used to manufacture 3 kg of stable practical MF Nb2Sn composite superconducting wire containing pure Cu(RRR approx. 200)/Ta. The draw state composite wire diameter was 0.56 mm, it contained 11,448 x 2.6 micron Nb core, and the twist distance was 1.5 cm. The composite wire cross-section was pure Cu/Ta/11,448 Nb core/Cu/ 91Sn-Cu; containing 22.8 v. % pure Cu, 13.3 v. % Ta; within the Ta layer to prevent Sn diffusion. The wire was sheathed in nonalkaline glass fiber as an insulating layer. A section of wire weighing 160 g was cut off and coiled it into a small solenoid. After reaction diffusion processing at 675 C/30 and curing by vacuum dipping in paraffin, it was measured in a Nb-Ti backfield of 7.2 T intensity, a current of 129 A was passed through the Nb3Sn solenoid and produced a strength of 2.5 T, the overall magnetic field intensity of the composite magnet reached 9.7 T. At this time, the wire full current density J sub c.w. = 5.2 x 10 to the 4th power A/sq cm; the effective current density J sub c (Nb + Sn - Cu) = 8.2 x 10 to the 4th power A/sq cm.

  19. Cavitation during wire brushing

    NASA Astrophysics Data System (ADS)

    Li, Bo; Zou, Jun; Ji, Chen

    2016-11-01

    In our daily life, brush is often used to scrub the surface of objects, for example, teeth, pots, shoes, pool, etc. And cleaning rust and stripping paint are accomplished using wire brush. Wire brushes also can be used to clean the teeth for large animals, such as horses, crocodiles. By observing brushing process in water, we capture the cavitation phenomenon on the track of moving brush wire. It shows that the cavitation also can affect the surface. In order to take clear and entire pictures of cavity, a simplified model of one stainless steel wire brushing a boss is adopted in our experiment. A transparent organic tank filled with deionized water is used as a view box. And a high speed video camera is used to record the sequences. In experiment, ambient pressure is atmospheric pressure and deionized water temperature is kept at home temperature. An obvious beautiful flabellate cavity zone appears behind the moving steel wire. The fluctuation of pressure near cavity is recorded by a hydrophone. More movies and pictures are used to show the behaviors of cavitation bubble following a restoring wire. Beautiful tracking cavitation bubble cluster is captured and recorded to show.

  20. Flashover failures from wet-wire arcing and tracking

    NASA Astrophysics Data System (ADS)

    Campbell, F. J.

    1984-12-01

    Flashover failure occurs in a wire bundle as a high-energy surge between a bare conductor delivering power and a ground-plane (e.g., metal framework or wire shielding) as the conductive path across adjacent wires approaches zero resistance. It happens as a violent blazing flashover in which the copper of the bare wire melts and splatters - causing melting and burn-through of some of the adjacent wires in the bundle. Thus, it could produce the loss of a number of circuits at once. Under service stress conditions the process leading to a flashover could begin as the wire insulation initially deteriorates by cracking or chaffing and the surfaces of adjacent wires in the bundles become contaminated due to salt spray, mist, fog and high humidity. Under these conditions, typical of Naval aircraft service, arcing and tracking initiate and eventually localized spots extend into a continuous carbonaceous path, bridging the wires from the fault to ground. At some point the wetting is no longer necessary to sustain the current, and the flashover strikes. This phenomena is known to develop on the surfaces of polymeric materials that readily carbonize when pyrolized and the susceptibility to fail by this mechanism is characterized in standard arcing and tracking tests. The phenyl-containing polymeric materials fall into this class. Laboratory tests have demonstrated that flashover will occur on wires insulated with a hi-phenyl polyimide composite and also on wires insulated with a polyphenyl ketone polymer; whereas, two types of a polytetrafluoroethylene insulation did not carbonize or flashover in the test. These results are in agreement with other references on arcing and tracking studies.

  1. Splicing Wires Permanently With Explosives

    NASA Technical Reports Server (NTRS)

    Bement, Laurence J.; Kushnick, Anne C.

    1990-01-01

    Explosive joining process developed to splice wires by enclosing and metallurgically bonding wires within copper sheets. Joints exhibit many desirable characteristics, 100-percent conductivity and strength, no heat-induced annealing, no susceptibility to corrosion in contacts between dissimilar metals, and stability at high temperature. Used to join wires to terminals, as well as to splice wires. Applicable to telecommunications industry, in which millions of small wires spliced annually.

  2. NASA/BAE SYSTEMS SpaceWire Effort

    NASA Technical Reports Server (NTRS)

    Rakow, Glenn Parker; Schnurr, Richard G.; Kapcio, Paul

    2003-01-01

    This paper discusses the state of the NASA and BAE SYSTEMS developments of SpaceWire. NASA has developed intellectual property that implements SpaceWire in Register Transfer Level (RTL) VHDL for a SpaceWire link and router. This design has been extensively verified using directed tests from the SpaceWire Standard and design specification, as well as being randomly tested to flush out hard to find bugs in the code. The high level features of the design will be discussed, including the support for multiple time code masters, which will be useful for the James Webb Space Telescope electrical architecture. This design is now ready to be targeted to FPGA's and ASICs. Target utilization and performance information will be presented for Spaceflight worthy FPGA's and a discussion of the ASIC implementations will be addressed. In particular, the BAE SYSTEMS ASIC will be highlighted which will be implemented on their .25micron rad-hard line. The chip will implement a 4-port router with the ability to tie chips together to make larger routers without external glue logic. This part will have integrated LVDS drivers/receivers, include a PLL and include skew control logic. It will be targeted to run at greater than 300 MHz and include the implementation for the proposed SpaceWire transport layer. The need to provide a reliable transport mechanism for SpaceWire has been identified by both NASA And ESA, who are attempting to define a transport layer standard that utilizes a low overhead, low latency connection oriented approach that works end-to-end. This layer needs to be implemented in hardware to prevent bottlenecks.

  3. NASA/BAE SYSTEMS SpaceWire Effort

    NASA Technical Reports Server (NTRS)

    Rakow, Glenn Parker; Schnurr, Richard G.; Kapcio, Paul

    2003-01-01

    This paper discusses the state of the NASA and BAE SYSTEMS developments of SpaceWire. NASA has developed intellectual property that implements SpaceWire in Register Transfer Level (RTL) VHDL for a SpaceWire link and router. This design has been extensively verified using directed tests from the SpaceWire Standard and design specification, as well as being randomly tested to flush out hard to find bugs in the code. The high level features of the design will be discussed, including the support for multiple time code masters, which will be useful for the James Webb Space Telescope electrical architecture. This design is now ready to be targeted to FPGA's and ASICs. Target utilization and performance information will be presented for Spaceflight worthy FPGA's and a discussion of the ASIC implementations will be addressed. In particular, the BAE SYSTEMS ASIC will be highlighted which will be implemented on their .25micron rad-hard line. The chip will implement a 4-port router with the ability to tie chips together to make larger routers without external glue logic. This part will have integrated LVDS drivers/receivers, include a PLL and include skew control logic. It will be targeted to run at greater than 300 MHz and include the implementation for the proposed SpaceWire transport layer. The need to provide a reliable transport mechanism for SpaceWire has been identified by both NASA And ESA, who are attempting to define a transport layer standard that utilizes a low overhead, low latency connection oriented approach that works end-to-end. This layer needs to be implemented in hardware to prevent bottlenecks.

  4. Steal Tree: Low-Overhead Tracing of Work Stealing Schedulers

    SciTech Connect

    Lifflander, Jonathan; Krishnamoorthy, Sriram; Kale, Laxmikant

    2013-06-16

    Work stealing is a popular approach to scheduling task-parallel programs. The flexibility inherent in work stealing when dealing with load imbalance results in seemingly irregular computation structures, complicating the study of its runtime behavior. In this paper, we present an approach to efficiently trace async-finish parallel programs scheduled using work stealing. We identify key properties that allow us to trace the execution of tasks with low time and space overheads. We also study the usefulness of the proposed schemes in supporting algorithms for data-race detection and retentive steal- ing presented in the literature. We demonstrate that the perturbation due to tracing is within the variation in the execution time with 99% confidence and the traces are concise, amounting to a few tens of kilobytes per thread in most cases. We also demonstrate that the traces enable significant reductions in the cost of detecting data races and result in low, stable space overheads in supporting retentive stealing for async-finish programs.

  5. Overhead cam shaft type V-engine cylinder block

    SciTech Connect

    Tominaga, N.; Kurai, N.; Ueno, H.; Suzuki, S.

    1987-01-06

    This patent describes an overhead camshaft type V-engine having V-shaped cylinders equipped with and overhead camshaft drive by a timing chain disposed and arranged on either side of the cylinders at a right angle to a crankshaft. The improvement comprises: a cylinder block; a timing chain passage in the cylinder block, the passage housing the timing chain movement in a plane of the chain. The passage includes a spacing on each side of a pair of runs of the chain, and in the plane, the spacing on each side of a pair of runs of the chain being substantially the same; the block further including a wall at least partially bounding the spacings and intersecting the plane. The wall has symmetrical wall openings therethrough symmetrically disposed on opposite sides of the chain and its plane, and opening into a respective substantially same spacing; a plurality of chain guide means, each mounted in a respective substantially same spacing; and tensioning means resiliently biasing one of the chain guide means toward and against a run of the chain to place the chain in tension, at least a portion of the tensioning means being mounted in one of the symmetrical wall openings adjacent to the respective run. The symmetry of the symmetrical wall openings enable the tensioning means to be positioned adjacent to either run, whereby the cylinder block may be used for diametrically opposite cylinders.

  6. Vertical Jump Biomechanics Altered With Virtual Overhead Goal.

    PubMed

    Ford, Kevin R; Nguyen, Anh-Dung; Hegedus, Eric J; Taylor, Jeffrey B

    2017-04-01

    Virtual environments with real-time feedback can simulate extrinsic goals that mimic real life conditions. The purpose was to compare jump performance and biomechanics with a physical overhead goal (POG) and with a virtual overhead goal (VOG). Fourteen female subjects participated (age: 18.8 ± 1.1 years, height: 163.2 ± 8.1 cm, weight 63.0 ± 7.9 kg). Sagittal plane trunk, hip, and knee biomechanics were calculated during the landing and take-off phases of drop vertical jump with different goal conditions. Repeated-measures ANOVAs determined differences between goal conditions. Vertical jump height displacement was not different during VOG compared with POG. Greater hip extensor moment (P < .001*) and hip angular impulse (P < .004*) were found during VOG compared with POG. Subjects landed more erect with less magnitude of trunk flexion (P = .002*) during POG compared with VOG. A virtual target can optimize jump height and promote increased hip moments and trunk flexion. This may be a useful alternative to physical targets to improve performance during certain biomechanical testing, screening, and training conditions.

  7. Rehabilitation of the Overhead Athlete’s Elbow

    PubMed Central

    Wilk, Kevin E.; Macrina, Leonard C.; Cain, E. Lyle; Dugas, Jeffrey R.; Andrews, James R.

    2012-01-01

    The activities required during overhead sports, particularly during baseball pitching, produce large forces at the elbow joint. Injuries to the elbow joint frequently occur in the overhead athlete because of the large amount of forces observed during the act of throwing, playing tennis, or playing golf. Injuries may result because of repetitive overuse, leading to tissue failure. Rehabilitation following injury or surgery to the throwing elbow is vital to fully restore normal function and return the athlete to competition as quickly and safely as possible. Rehabilitation of the elbow, whether following injury or postsurgical, must follow a progressive and sequential order, building on the previous phase, to ensure that healing tissues are not compromised. Emphasis is placed on restoring full motion, muscular strength, and neuromuscular control while gradually applying loads to healing tissue. In addition, when one is creating a rehabilitation plan for athletes, it is imperative to treat the entire upper extremity, core, and legs to create and dissipate the forces generated at each joint. PMID:23016113

  8. TAUOVERSUPERMON: LOW-OVERHEAD ONLINE PARALLEL PERFORMANCE MONITORING

    SciTech Connect

    SOTTILE, MATTHEW JOSEPH; NATARAJ, AROON; MALONY, ALLEN; MORRIS, ALAN; SHENDE, SAMEER

    2007-01-30

    Online or Real-time application performance monitoring allows tracking performance characteristics during execution as opposed to doing so post-mortem. This opens up several possibilities otherwise unavailable such as real-time visualization and application performance steering that can be useful in the context of long-running applications. Two fundamental components that constitute such a performance monitor are the measurement and transport systems. The former captures performance metrics of individual contexts (processes, threads). The latter enables querying the parallel/distributed state from the different contexts and also allows measurement control. As HPC systems grow in size and complexity, the key challenge is to keep the online performance monitor scalable and low overhead while still providing a useful performance reporting capability. We adapt and combine two existing, mature systems - Tuning and Analysis Utility (TAU) and Supermon - to address this problem. Tau performs the measurement while Supermon is used to collect the distributed measurement state. Our experiments show that this novel approach of using a cluster-monitor, Supermon, as the transport for online performance data from Tau leads to very low-overhead application monitoring as well as other beneits unavailable from using a traditional transport such as NFS.

  9. Output gating performance overhead elimination for scan test

    NASA Astrophysics Data System (ADS)

    Suhag, Ashok Kumar; Ahlawat, Satdev; Shrivastava, Vivek; Choudhary, Rahul Raj

    2015-07-01

    Switching activity is much higher in test mode as compared to normal mode of operation which causes higher power dissipation, and this leads to several reliability issues. Output gating is proposed as a very effective low-power test technique, which is used to eliminate redundant switching activity in the combinational logic of circuit under test (CUT) during the shifting of test vectors in a scan chain. This method reduces the average power significantly, but it introduces performance overhead in normal mode of operation. In this work, a new output gating technique is proposed which eliminates redundant switching activity in combinational logic of CUT during shifting of test vectors without any negative impact on performance as compared to earlier proposed output gating techniques. The proposed design also improves the performance of the scan flop in functional mode with negligible area overhead incurred due to extra transistors. Experimental results show that our design has a more robust performance over wide range of capacitive load as compared to earlier designs.

  10. Detailed side and overhead views of geologic features from joint panoramic and blimp operations

    SciTech Connect

    Chase, T.E.; Young, J.D. )

    1990-06-01

    A portion of the California coast, including the Loma Prieta earthquake damage at Moss Landing, is shown with the topography displayed from side and overhead viewing angles. This technique offers a different approach to mapping shorelines and studying the oceanographic forces creating and shaping these geologic features. Two pieces of equipment were developed to create these views. The first is a panoramic camera with viewing angles up to 360{degree} and two telephoto settings (70mm and 210mm) allowing a feature to be photographed from the same point with different lens magnifications. The second is a 20 ft helium-filled blimp with 35mm cameras mounted in a tray with a radio control receiver triggering the camera shutters after receiving a signal transmitted from a person on the ground. Video camcorders can also be carried. Tethered to the person on the ground, the blimp's height is determined by the amount of line payed out. Horizontal movement of the blimp is controlled by the operator walking or riding slowly in a boat or truck. The blimp can be flown at different elevations, remain in a stationary position for time-lapse photographs, or be moved about to prepare a mosaic of the area. Both systems can be used in remote areas because they are portable and the power supplies needed to operate are from lightweight batteries.

  11. Development of sensorless easy-to-use overhead crane system via simulation based control

    NASA Astrophysics Data System (ADS)

    Tagawa, Yasutaka; Mori, Yoshihito; Wada, Masaomi; Kawajiri, Eisaku; Nouzuka, Kazuma

    2016-09-01

    This paper describes the newly developed overhead crane which has a sensorless vibration control system. Generally, loads which are carried by the overhead cranes are easy to vibrate and only skilled people can operate the cranes. Therefore, a lot of studies have been done to solve this problem by using feedback control with vibration sensors. However vibration sensors often break down in severe industrial environment and more reliable control systems are required. For this reason, we have been developing sensorless control system for overhead cranes. In this paper, we firstly introduce basic idea of simulation based control which is called IDCS, then overview and modeling of the overhead crane is presented. Next, the control system design of the overhead crane is discussed, and experimental results are shown for real overhead crane with 2 axes.

  12. Thermal Testing and Integration: Magnetospheric MultiScale (MMS) Observatories with Digital 1-Wire Sensors

    NASA Technical Reports Server (NTRS)

    Solimani, Jason A.; Rosanova, Santino

    2015-01-01

    Thermocouples require two thin wires to be routed out of the spacecraft to connect to the ground support equipment used to monitor and record the temperature data. This large number of wires that exit the observatory complicates integration and creates an undesirable heat path during testing. These wires exiting the spacecraft need to be characterized as a thermal short that will not exist during flight. To minimize complexity and reduce thermal variables from these ground support equipment (GSE) wires, MMS pursued a hybrid path for temperature monitoring, utilizing thermocouples and digital 1-wire temperature sensors. Digital 1-wire sensors can greatly reduce harness mass, length and complexity as they can be spliced together. For MMS, 350 digital 1-wire sensors were installed on the spacecraft with only 18 wires exiting as opposed to a potential 700 thermocouple wires. Digital 1-wire sensors had not been used in such a large scale at NASAGSFC prior to the MMS mission. During the MMS thermal vacuum testing a lessons learned matrix was formulated that will assist future integration of 1-wires into thermal testing and one day into flight.

  13. Software in the DOE: The Hidden Overhead of''The Build''

    SciTech Connect

    Kumfert, G; Epperly, T

    2002-02-28

    ''The Build'' is the infrastructure needed to convert software from source code to usable form. It is intimately tied to the software it supports, knowing about every file and automating every transformation needed to produce a working program. Every developer knows that a project spends some labor overhead on ''the build.'' How big is this hidden overhead? According to 34 scientific software developers we surveyed at Lawrence Livermore National Labs, among colleagues at other DOE labs, and a handful of academics the ''perceived'' overhead averages around 12%. Individual cases of 20% to 30% were not uncommon. In one project claiming a 20% overhead, we found supporting evidence by combing through their CVS repository.

  14. Wire brush fastening device

    SciTech Connect

    Meigs, R.A.

    1993-08-31

    A fastening device is provided which is a variation on the conventional nut and bolt. The bolt has a longitudinal axis and threading helically affixed thereon along the longitudinal axis. A nut having a bore extending therethrough is provided. The bore of the nut has a greater diameter than the diameter of the bolt so the bolt can extend through the bore. An array of wire bristles are affixed within the bore so as to form a brush. The wire bristles extend inwardly from the bore and are constructed and arranged of the correct size, length and stiffness to guide the bolt within the bore and to restrain the bolt within the bore as required. A variety of applications of the wire brush nut are disclosed, including a bolt capture device and a test rig apparatus.

  15. Wire brush fastening device

    DOEpatents

    Meigs, R.A.

    1995-09-19

    A fastening device is provided which is a variation on the conventional nut and bolt. The bolt has a longitudinal axis and threading helically affixed thereon along the longitudinal axis. A nut having a bore extending therethrough is provided. The bore of the nut has a greater diameter than the diameter of the bolt so the bolt can extend through the bore. An array of wire bristles are affixed within the bore so as to form a brush. The wire bristles extend inwardly from the bore and are constructed and arranged of the correct size, length and stiffness to guide the bolt within the bore and to restrain the bolt within the bore as required. A variety of applications of the wire brush nut are disclosed, including a bolt capture device and a test rig apparatus. 13 figs.

  16. Wire brush fastening device

    DOEpatents

    Meigs, Richard A.

    1995-01-01

    A fastening device is provided which is a variation on the conventional nut and bolt. The bolt has a longitudinal axis and threading helically affixed thereon along the longitudinal axis. A nut having a bore extending therethrough is provided. The bore of the nut has a greater diameter than the diameter of the bolt so the bolt can extend through the bore. An array of wire bristles are affixed within the bore so as to form a brush. The wire bristles extend inwardly from the bore and are constructed and arranged of the correct size, length and stiffness to guide the bolt within the bore and to restrain the bolt within the bore as required. A variety of applications of the wire brush nut are disclosed, including a bolt capture device and a test rig apparatus.

  17. Increased range of ultrasonic guided wave testing of overhead transmission line cables using dispersion compensation.

    PubMed

    Legg, Mathew; Yücel, Mehmet K; Kappatos, Vassilios; Selcuk, Cem; Gan, Tat-Hean

    2015-09-01

    Overhead Transmission Line (OVTL) cables can experience structural defects and are, therefore, inspected using Non-Destructive Testing (NDT) techniques. Ultrasonic Guided Waves (UGW) is one NDT technique that has been investigated for inspection of these cables. For practical use, it is desirable to be able to inspect as long a section of cable as possible from a single location. This paper investigates increasing the UGW inspection range on Aluminium Conductor Steel Reinforced (ACSR) cables by compensating for dispersion using dispersion curve data. For ACSR cables, it was considered to be difficult to obtain accurate dispersion curves using modelling due to the complex geometry and unknown coupling between wire strands. Group velocity dispersion curves were, therefore, measured experimentally on an untensioned, 26.5m long cable and a method of calculating theoretical dispersion curves was obtained. Attenuation and dispersion compensation were then performed for a broadband Maximum Length Sequence (MLS) excitation signal. An increase in the Signal to Noise Ratio (SNR) of about 4-8dB compared to that of the dispersed signal was obtained. However, the main benefit was the increased ability to resolve the individual echoes from the end of the cable and an introduced defect in the form of a cut, which was 7 to at least 13dB greater than that of the dispersed signal. Five echoes were able to be clearly detected using MLS excitation signal, indicating the potential for an inspection range of up to 130m in each direction. To the best of the authors knowledge, this is the longest inspection range for ACSR cables reported in the literature, where typically cables, which were only one or two meter long, have been investigated previously. Narrow band tone burst and Hann windowed tone burst excitation signal also showed increased SNR and ability to resolve closely spaced echoes. Copyright © 2015 Elsevier B.V. All rights reserved.

  18. Flying wires at Fermilab

    SciTech Connect

    Gannon, J.; Crawford, C.; Finley, D.; Flora, R.; Groves, T.; MacPherson, M.

    1989-03-01

    Transverse beam profile measurement systems called ''Flying Wires'' have been installed and made operational in the Fermilab Main Ring and Tevatron accelerators. These devices are used routinely to measure the emittance of both protons and antiprotons throughout the fill process, and for emittance growth measurements during stores. In the Tevatron, the individual transverse profiles of six proton and six antiproton bunches are obtained simultaneously, with a single pass of the wire through the beam. Essential features of the hardware, software, and system operation are explained in the rest of the paper. 3 refs., 4 figs.

  19. Wearable IMU for Shoulder Injury Prevention in Overhead Sports

    PubMed Central

    Rawashdeh, Samir A.; Rafeldt, Derek A.; Uhl, Timothy L.

    2016-01-01

    Body-worn inertial sensors have enabled motion capture outside of the laboratory setting. In this work, an inertial measurement unit was attached to the upper arm to track and discriminate between shoulder motion gestures in order to help prevent shoulder over-use injuries in athletics through real-time preventative feedback. We present a detection and classification approach that can be used to count the number of times certain motion gestures occur. The application presented involves tracking baseball throws and volleyball serves, which are common overhead movements that can lead to shoulder and elbow overuse injuries. Eleven subjects are recruited to collect training, testing, and randomized validation data, which include throws, serves, and seven other exercises that serve as a large null class of similar movements, which is analogous to a realistic usage scenario and requires a robust estimator. PMID:27827880

  20. Hydro-mechanical overhead for internal combustion engine

    SciTech Connect

    Meistrick, Z.S.; Price, R.B.

    1987-05-12

    This patent describes a hydro-mechanical overhead for a multi-cylinder four-cycle internal combustion engine having a camshaft, intake valve pushtube means driven by the camshaft, exhaust valve pushtube means driven by the camshaft, at least one intake and exhaust valve for each cylinder of the multi-cylinder internal combustion engines and a piston for each cylinder of the engine. The process comprises an intake valve master piston means for each engine cylinder. Each intake valve master piston means is driven by one of the intake valve pushtube means. There is an exhaust valve master piston means for each engine cylinder, and each exhaust valve master piston means is driven by one of the exhaust valve pushtube means.

  1. Reducing the quantum-computing overhead with complex gate distillation

    NASA Astrophysics Data System (ADS)

    Duclos-Cianci, Guillaume; Poulin, David

    2015-04-01

    In leading fault-tolerant quantum-computing schemes, accurate transformations are obtained by a two-stage process. In a first stage, a discrete universal set of fault-tolerant operations is obtained by error-correcting noisy transformations and distilling resource states. In a second stage, arbitrary transformations are synthesized to desired accuracy by combining elements of this set into a circuit. Here we present a scheme that merges these two stages into a single one, directly distilling complex transformations. We find that our scheme can reduce the total overhead to realize certain gates by up to a few orders of magnitude. In contrast to other schemes, this efficient gate synthesis does not require computationally intensive compilation algorithms and a straightforward generalization of our scheme circumvents compilation and synthesis altogether.

  2. Wearable IMU for Shoulder Injury Prevention in Overhead Sports.

    PubMed

    Rawashdeh, Samir A; Rafeldt, Derek A; Uhl, Timothy L

    2016-11-03

    Body-worn inertial sensors have enabled motion capture outside of the laboratory setting. In this work, an inertial measurement unit was attached to the upper arm to track and discriminate between shoulder motion gestures in order to help prevent shoulder over-use injuries in athletics through real-time preventative feedback. We present a detection and classification approach that can be used to count the number of times certain motion gestures occur. The application presented involves tracking baseball throws and volleyball serves, which are common overhead movements that can lead to shoulder and elbow overuse injuries. Eleven subjects are recruited to collect training, testing, and randomized validation data, which include throws, serves, and seven other exercises that serve as a large null class of similar movements, which is analogous to a realistic usage scenario and requires a robust estimator.

  3. Phase Sensitive Cueing for 3D Objects in Overhead Images

    SciTech Connect

    Paglieroni, D W; Eppler, W G; Poland, D N

    2005-02-18

    A 3D solid model-aided object cueing method that matches phase angles of directional derivative vectors at image pixels to phase angles of vectors normal to projected model edges is described. It is intended for finding specific types of objects at arbitrary position and orientation in overhead images, independent of spatial resolution, obliqueness, acquisition conditions, and type of imaging sensor. It is shown that the phase similarity measure can be efficiently evaluated over all combinations of model position and orientation using the FFT. The highest degree of similarity over all model orientations is captured in a match surface of similarity values vs. model position. Unambiguous peaks in this surface are sorted in descending order of similarity value, and the small image thumbnails that contain them are presented to human analysts for inspection in sorted order.

  4. COMPARISON OF SCAPULAR MUSCLE ACTIVATIONS DURING THREE OVERHEAD THROWING EXERCISES.

    PubMed

    Henning, Lisa; Plummer, Hillary; Oliver, Gretchen D

    2016-02-01

    With shoulder pain and injury on the rise in overhead athletes, clinicians are often examining preventative exercises to address functional abnormalities. Because shoulder impingement is prevalent in overhead athletes, much focus is on scapular stability and the function of the stabilizing force couple of the upper and lower trapezius and serratus anterior. The purpose of this study was to examine scapular muscle activation during a series of throws and holds (throwing without releasing) with two different ball weights (7oz and 12oz). It was hypothesized that the holds exercises would elicit greater activation of the scapular musculature than the throw, irrespective of ball weight. Case control laboratory study. Twenty-two NCAA Division I, right hand dominant, softball players (19.91 + 1.04 years; 169.24 + 7.36 cm; 72.09 + 10.61 kg) volunteered to participate. Surface EMG was utilized to measure muscle activity in the upper, middle and lower trapezius and serratus anterior muscles during three different throwing activities. MANOVA results revealed no significant differences in muscle activity between throwing conditions, F(16,82) = 1.02, p = 0.446, Wilks' Λ = 0.696, Cohen's d = 0.44 (7oz holds), 0.24 (12oz holds), power = 0.625. The results may provide some clinical insight in advocating the use of holds with different ball weights. The holds throw may be an effective step in shoulder strengthening that can more closely mimic the functional movement of throwing without the element of ball release. Level 3.

  5. Wiring for space applications program

    NASA Astrophysics Data System (ADS)

    Hammoud, Ahmad

    1994-01-01

    The insulation testing and analysis consists of: identifying and prioritizing NASA wiring requirements; selecting candidate wiring constructions; developing test matrix and formulating test program; managing, coordinating, and conducting tests; and analyzing and documenting data, establishing guidelines and recommendations.

  6. One hundred angstrom niobium wire

    NASA Technical Reports Server (NTRS)

    Cline, H. E.; Rose, R. M.; Wulff, J.

    1968-01-01

    Composite of fine niobium wires in copper is used to study the size and proximity effects of a superconductor in a normal matrix. The niobium rod was drawn to a 100 angstrom diameter wire on a copper tubing.

  7. Easily-wired toggle switch

    NASA Technical Reports Server (NTRS)

    Dean, W. T.; Stringer, E. J.

    1979-01-01

    Crimp-type connectors reduce assembly and disassembly time. With design, no switch preparation is necessary and socket contracts are crimped to wires inserted in module attached to back of toggle switch engaging pins inside module to make electrical connections. Wires are easily removed with standard detachment tool. Design can accommodate wires of any gage and as many terminals can be placed on switch as wire gage and switch dimensions will allow.

  8. LANSCE wire scanner AFE: analysis, design, and fabrication

    SciTech Connect

    Gruchalla, Mike; Chacon, Phillip; Gilpatrick, John D; Martinez, Derwin; Power, John F; Smith, Brian

    2010-01-01

    The goal of the design LANSCE-R Wire-Scanner Analog Front-end Electronics is to develop a high-performance, dual-axis wire-scanner analog front-end system implemented in a single cRIO module. This new design accommodates macropulse widths as wide as 700 {mu}s at a maximum pulse rate of 120Hz. A lossey integrator is utilized as the integration element to eliminate the requirement for providing gating signals to each wire scanner. The long macropulse and the high repetition rate present conflicting requirements for the design of the integrator. The long macropulse requires a long integration time constant to assure minimum integrator droop for accurate charge integration, and the high repetition rate requires a short time constant to assure adequate integrator reset between macropulses. Also, grounding is a serious concern due to the small signal levels. This paper reviews the basic Wire Scanner AFE system design implemented in the cRIO-module form factor to capture the charge information from the wire sensors and the grounding topology to assure minimum noise contamination of the wire signals.

  9. SCALING UNDERWATER EXPLODING WIRES

    DTIC Science & Technology

    heat of detonation of TNT in calories per gram. This scaling behavior extends the law of similarity six decades in terms of weight, from pounds to micropounds. The peak pressure for exploding-wire phenomena has been obtained from data and is emprically expressed as pm = 26,800 (cube root of W/R) to

  10. Hopkins installs wire harnesses

    NASA Image and Video Library

    2013-11-24

    ISS038-E-008291 (24 Nov. 2013) --- NASA astronaut Michael Hopkins, Expedition 38 flight engineer, installs wire harnesses in the International Space Station?s Harmony node to support the installation of Ethernet video cables for the station?s local area network. These new cables will provide Ethernet connectivity to the visiting vehicles that dock to Harmony?s Earth-facing port.

  11. Gaseous wire detectors

    SciTech Connect

    Va'vra, J.

    1997-08-01

    This article represents a series of three lectures describing topics needed to understand the design of typical gaseous wire detectors used in large high energy physics experiments; including the electrostatic design, drift of electrons in the electric and magnetic field, the avalanche, signal creation, limits on the position accuracy as well as some problems one encounters in practical operations.

  12. A World without Wires

    ERIC Educational Resources Information Center

    Panettieri, Joseph C.

    2006-01-01

    The wireless bandwagon is rolling across Mississippi, picking up a fresh load of converts and turning calamity into opportunity. Traditional wired school networks, many of which unraveled during Hurricane Katrina, are giving way to advanced wireless mesh networks that frequently include voice-over-IP (VoIP) capabilities. Vendor funding is helping…

  13. Residential Wiring. Second Edition.

    ERIC Educational Resources Information Center

    Taylor, Mark; And Others

    This guide is designed to assist teachers conducting a course to prepare students for entry-level employment in the residential wiring trade. Included in the guide are six instructional units and the following sections of information for teachers: guidelines in using the unit components; academic and workplace skills classifications and…

  14. Improved wire chamber

    DOEpatents

    Atac, M.

    1987-05-12

    An improved gas mixture for use with proportional counter devices, such as Geiger-Mueller tubes and drift chambers. The improved gas mixture provides a stable drift velocity while eliminating wire aging caused by prior art gas mixtures. The new gas mixture is comprised of equal parts argon and ethane gas and having approximately 0.25% isopropyl alcohol vapor. 2 figs.

  15. Debate: Wired versus Wireless.

    ERIC Educational Resources Information Center

    Meeks, Glenn; Nair, Prakash

    2000-01-01

    Debates the issue of investing in wiring schools for desktop computer networks versus using laptops and wireless networks. Included are cost considerations and the value of technology for learning. Suggestions include using wireless networks for existing schools, hardwiring computers for new construction, and not using computers for elementary…

  16. NewsWire, 2002.

    ERIC Educational Resources Information Center

    Byrom, Elizabeth, Ed.; Bingham, Margaret, Ed.; Bowman, Gloria, Ed.; Shoemaker, Dan, Ed.

    2002-01-01

    This document presents the 3 2002 issues of the newsletter "NewsWire," (volume 5). Issue Number One focuses on collaborative Web projects. This issue begins with descriptions of four individual projects: "iEARN"; "Operation RubyThroat"; "Follow the Polar Huskies!"; and "Log in Your Animal Roadkill!" Features that follow include: "Bringing the…

  17. Basic Wiring. Second Edition.

    ERIC Educational Resources Information Center

    Kaltwasser, Stan; And Others

    This guide is designed to assist teachers conducting a foundation course to prepare students for additional courses of training for entry-level employment in either the residential or commercial and industrial wiring trades. Included in the guide are 17 instructional units and the following sections of information for teachers: guidelines in using…

  18. Residential Wiring. Revised.

    ERIC Educational Resources Information Center

    Taylor, Mark

    This competency-based curriculum guide contains materials for conducting a course in residential wiring. A technically revised edition of the 1978 publication, the guide includes 28 units. Each instructional unit includes some or all of the following basic components: performance objectives, suggested activities for teachers and students,…

  19. One-wire thermocouple

    NASA Technical Reports Server (NTRS)

    Goodrich, W. D.; Staimach, C. J.

    1977-01-01

    Nickel alloy/constantan device accurately measures surface temperature at precise locations. Device is moderate in cost and simplifies fabrication of highly-instrumented seamless-surface heat-transfer models. Device also applies to metal surfaces if constantan wire has insulative coat.

  20. A World without Wires

    ERIC Educational Resources Information Center

    Panettieri, Joseph C.

    2006-01-01

    The wireless bandwagon is rolling across Mississippi, picking up a fresh load of converts and turning calamity into opportunity. Traditional wired school networks, many of which unraveled during Hurricane Katrina, are giving way to advanced wireless mesh networks that frequently include voice-over-IP (VoIP) capabilities. Vendor funding is helping…

  1. 31 CFR Appendix I(f) to Part 13 - Estimated Overhead and Administrative Costs

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Estimated Overhead and Administrative Costs I(F) Appendix I(F) to Part 13 Money and Finance: Treasury Office of the Secretary of the Treasury... Pt. 13, App. I(F) Appendix I(F) to Part 13—Estimated Overhead and Administrative Costs Date:...

  2. 31 CFR Appendix I(f) to Part 13 - Estimated Overhead and Administrative Costs

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Estimated Overhead and Administrative Costs I(F) Appendix I(F) to Part 13 Money and Finance: Treasury Office of the Secretary of the Treasury... Pt. 13, App. I(F) Appendix I(F) to Part 13—Estimated Overhead and Administrative Costs Date:...

  3. 31 CFR Appendix II(f) to Part 13 - Overhead and Administrative Costs

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Overhead and Administrative Costs II(F) Appendix II(F) to Part 13 Money and Finance: Treasury Office of the Secretary of the Treasury... Pt. 13, App. II(F) Appendix II(F) to Part 13—Overhead and Administrative Costs Date: Select Only...

  4. 31 CFR Appendix II(f) to Part 13 - Overhead and Administrative Costs

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Overhead and Administrative Costs II(F) Appendix II(F) to Part 13 Money and Finance: Treasury Office of the Secretary of the Treasury... Pt. 13, App. II(F) Appendix II(F) to Part 13—Overhead and Administrative Costs Date: Select Only...

  5. 31 CFR Appendix I(f) to Part 13 - Estimated Overhead and Administrative Costs

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Estimated Overhead and Administrative Costs I(F) Appendix I(F) to Part 13 Money and Finance: Treasury Office of the Secretary of the Treasury... Pt. 13, App. I(F) Appendix I(F) to Part 13—Estimated Overhead and Administrative Costs Date:...

  6. 31 CFR Appendix I(f) to Part 13 - Estimated Overhead and Administrative Costs

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Estimated Overhead and Administrative Costs I(F) Appendix I(F) to Part 13 Money and Finance: Treasury Office of the Secretary of the Treasury... Pt. 13, App. I(F) Appendix I(F) to Part 13—Estimated Overhead and Administrative Costs Date:...

  7. A Guide to the Use of the Overhead Projector. Teaching and Learning in Higher Education, 14.

    ERIC Educational Resources Information Center

    Ellington, Henry

    A sequel to the booklet "A Review of the Different Types of Instructional Materials Available to Teachers and Lecturers," this booklet begins by discussing the main educational uses of the overhead projector and its various strengths and weaknesses. Basic guidelines for using the overhead projector effectively are then offered, which include ways…

  8. 75 FR 81661 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Overhead...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-28

    ...; Overhead and Gantry Cranes Standard ACTION: Notice. SUMMARY: The Department of Labor (DOL) hereby announces... collection request (ICR) titled, ``Overhead and Gantry Cranes Standard,'' to the Office of Management and... cranes standard specify requirements for: Marking the rated load of cranes; preparing certification...

  9. 30 CFR 57.19110 - Overhead protection for shaft deepening work.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Overhead protection for shaft deepening work... NONMETAL MINES Personnel Hoisting Shafts § 57.19110 Overhead protection for shaft deepening work. A substantial bulkhead or equivalent protection shall be provided above persons at work deepening a shaft....

  10. 30 CFR 56.19110 - Overhead protection for shaft deepening work.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Overhead protection for shaft deepening work... MINES Personnel Hoisting Shafts § 56.19110 Overhead protection for shaft deepening work. A substantial bulkhead or equivalent protection shall be provided above persons at work deepening a shaft....

  11. How To Prepare Effective Overhead Projector Presentations: One Picture Is Worth a Thousand Words.

    ERIC Educational Resources Information Center

    National Audio-Visual Supply, East Rutherford, NJ.

    Designed to help create effective presentations, this guide describes the basic techniques and provides hints for producing professional, attention-getting overhead transparencies in a step-by-step procedure format. Eight topics are addressed in the guide: (1) eight steps to a successful meeting presentation; (2) advantages of overhead projection;…

  12. Extending wire rope service life

    SciTech Connect

    Not Available

    1982-06-01

    Selecting the proper wire rope is not a simple procedure. Wire rope is a precision mining machine with scores of moving parts. It is therefore important for mining equipment users to know wire rope and how it is designed and constructed. Good lubrication and regular inspection is important for a safe and long service life.

  13. 1997 wire development workshop: Proceedings

    SciTech Connect

    1997-04-01

    This conference is divided into the following sections: (1) First Generation Wires I; (2) First Generation Wires II; (3) Coated conductors I; and (4) Coated conductors II. Applications of the superconducting wires include fault current limiters, superconducting motors, transformers, and power transmission lines.

  14. 49 CFR 234.267 - Insulation resistance tests, wires in trunking and cables.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Insulation resistance tests, wires in trunking and... Inspections and Tests § 234.267 Insulation resistance tests, wires in trunking and cables. (a) Insulation... thereafter. (b) Insulation resistance tests shall be made between all conductors and ground, between...

  15. 49 CFR 234.267 - Insulation resistance tests, wires in trunking and cables.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Insulation resistance tests, wires in trunking and... Inspections and Tests § 234.267 Insulation resistance tests, wires in trunking and cables. (a) Insulation... thereafter. (b) Insulation resistance tests shall be made between all conductors and ground, between...

  16. 49 CFR 234.267 - Insulation resistance tests, wires in trunking and cables.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Insulation resistance tests, wires in trunking and... Inspections and Tests § 234.267 Insulation resistance tests, wires in trunking and cables. (a) Insulation... thereafter. (b) Insulation resistance tests shall be made between all conductors and ground, between...

  17. 30 CFR 56.12069 - Lightning protection for telephone wires and ungrounded conductors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Lightning protection for telephone wires and... NONMETAL MINES Electricity § 56.12069 Lightning protection for telephone wires and ungrounded conductors... medium on the surface and shall be separated from neutral grounds by a distance of not less than 25 feet. ...

  18. KENNEDY SPACE CENTER, FLA. - Before dawn, the Space Infrared Telescope Facility (SIRTF) is attached to an overhead crane that will lift it up the mobile service tower on Launch Pad 17-B, Cape Canaveral Air Force Station. SIRTF will be attached to the Delta II rocket and encapsulated in its fairing before launch. Consisting of three cryogenically cooled science instruments and an 0.85-meter telescope, SIRTF is one of NASA’s largest infrared telescopes to be launched. It is the fourth and final element in NASA’s family of orbiting “Great Observatories.” SIRTF will obtain images and spectra by detecting the infrared energy, or heat, radiated by objects in space. Most of this infrared radiation is blocked by the Earth's atmosphere and cannot be observed from the ground.

    NASA Image and Video Library

    2003-08-10

    KENNEDY SPACE CENTER, FLA. - Before dawn, the Space Infrared Telescope Facility (SIRTF) is attached to an overhead crane that will lift it up the mobile service tower on Launch Pad 17-B, Cape Canaveral Air Force Station. SIRTF will be attached to the Delta II rocket and encapsulated in its fairing before launch. Consisting of three cryogenically cooled science instruments and an 0.85-meter telescope, SIRTF is one of NASA’s largest infrared telescopes to be launched. It is the fourth and final element in NASA’s family of orbiting “Great Observatories.” SIRTF will obtain images and spectra by detecting the infrared energy, or heat, radiated by objects in space. Most of this infrared radiation is blocked by the Earth's atmosphere and cannot be observed from the ground.

  19. Excessive magnetic field flux density distribution from overhead isolated powerline conductors due to neutral line current.

    PubMed

    Netzer, Moshe

    2013-06-01

    Overhead isolated powerline conductors (hereinafter: "OIPLC") are the most compact form for distributing low voltage currents. From the known physics of magnetic field emission from 3-phase power lines, it is expected that excellent symmetry of the 120° shifted phase currents and where compact configuration of the 3-phase+neutral line exist, the phase current vectorial summation of the magnetic field flux density (MFFD) is expected to be extremely low. However, despite this estimation, an unexpectedly very high MFFD was found in at least three towns in Israel. This paper explains the reasons leading to high MFFD emissions from compact OIPLC and the proper technique to fix it. Analysis and measurement results had led to the failure hypothsis of neutral line poor connection design and poor grounding design of the HV-LV utility transformers. The paper elaborates on the low MFFD exposure level setup by the Israeli Environmental Protection Office which adopted a rather conservative precaution principal exposure level (2 mG averaged over 24 h).

  20. Autonomous Commanding of the WIRE Spacecraft

    NASA Technical Reports Server (NTRS)

    Prior, Mike; Walyus, Keith; Saylor, Rick

    1999-01-01

    This paper presents the end-to-end design architecture for an autonomous commanding capability to be used on the Wide Field Infrared Explorer (WIRE) mission for the uplink of command loads during unattended station contacts. The WIRE mission is the fifth and final mission of NASA's Goddard Space Flight Center Small Explorer (SMEX) series to be launched in March of 1999. Its primary mission is the targeting of deep space fields using an ultra-cooled infrared telescope. Due to its mission design WIRE command loads are large (approximately 40 Kbytes per 24 hours) and must be performed daily. To reduce the cost of mission operations support that would be required in order to uplink command loads, the WIRE Flight Operations Team has implemented an autonomous command loading capability. This capability allows completely unattended operations over a typical two- day weekend period. The key factors driving design and implementation of this capability were: 1) Integration with already existing ground system autonomous capabilities and systems, 2) The desire to evolve autonomous operations capabilities based upon previous SMEX operations experience 3) Integration with ground station operations - both autonomous and man-tended, 4) Low cost and quick implementation, and 5) End-to-end system robustness. A trade-off study was performed to examine these factors in light of the low-cost, higher-risk SMEX mission philosophy. The study concluded that a STOL (Spacecraft Test and Operations Language) based script, highly integrated with other scripts used to perform autonomous operations, was best suited given the budget and goals of the mission. Each of these factors is discussed to provide an overview of the autonomous operations capabilities implemented for the mission. The capabilities implemented on the WIRE mission are an example of a low-cost, robust, and efficient method for autonomous command loading when implemented with other autonomous features of the ground system. They

  1. Autonomous Commanding of the WIRE Spacecraft

    NASA Technical Reports Server (NTRS)

    Prior, Mike; Walyus, Keith; Saylor, Rick

    1999-01-01

    This paper presents the end-to-end design architecture for an autonomous commanding capability to be used on the Wide Field Infrared Explorer (WIRE) mission for the uplink of command loads during unattended station contacts. The WIRE mission is the fifth and final mission of NASA's Goddard Space Flight Center Small Explorer (SMEX) series to be launched in March of 1999. Its primary mission is the targeting of deep space fields using an ultra-cooled infrared telescope. Due to its mission design WIRE command loads are large (approximately 40 Kbytes per 24 hours) and must be performed daily. To reduce the cost of mission operations support that would be required in order to uplink command loads, the WIRE Flight Operations Team has implemented an autonomous command loading capability. This capability allows completely unattended operations over a typical two- day weekend period. The key factors driving design and implementation of this capability were: 1) Integration with already existing ground system autonomous capabilities and systems, 2) The desire to evolve autonomous operations capabilities based upon previous SMEX operations experience 3) Integration with ground station operations - both autonomous and man-tended, 4) Low cost and quick implementation, and 5) End-to-end system robustness. A trade-off study was performed to examine these factors in light of the low-cost, higher-risk SMEX mission philosophy. The study concluded that a STOL (Spacecraft Test and Operations Language) based script, highly integrated with other scripts used to perform autonomous operations, was best suited given the budget and goals of the mission. Each of these factors is discussed to provide an overview of the autonomous operations capabilities implemented for the mission. The capabilities implemented on the WIRE mission are an example of a low-cost, robust, and efficient method for autonomous command loading when implemented with other autonomous features of the ground system. They

  2. From wires to cosmology

    NASA Astrophysics Data System (ADS)

    Amin, Mustafa A.; Baumann, Daniel

    2016-02-01

    We provide a statistical framework for characterizing stochastic particle production in the early universe via a precise correspondence to current conduction in wires with impurities. Our approach is particularly useful when the microphysics is uncertain and the dynamics are complex, but only coarse-grained information is of interest. We study scenarios with multiple interacting fields and derive the evolution of the particle occupation numbers from a Fokker-Planck equation. At late times, the typical occupation numbers grow exponentially which is the analog of Anderson localization for disordered wires. Some statistical features of the occupation numbers show hints of universality in the limit of a large number of interactions and/or a large number of fields. For test cases, excellent agreement is found between our analytic results and numerical simulations.

  3. Dental Arch Wire

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Straightening teeth is an arduous process requiring months, often years, of applying corrective pressure by means of arch wires-better known as brace-which may have to be changed several times in the course of treatment. A new method has been developed by Dr. George Andreasen, orthodontist and dental scientist at the University of Iowa. The key is a new type of arch wire material, called Nitinol, with exceptional elasticity which helps reduce the required number of brace changes. An alloy of nickel and titanium, Nitinol was originally developed for aerospace applications by the Naval Ordnance Laboratory, now the Naval Surface Weapons Laboratory, White Oaks, Maryland. NASA subsequently conducted additional research on the properties of Nitinol and on procedures for processing the metal.

  4. From wires to cosmology

    SciTech Connect

    Amin, Mustafa A.; Baumann, Daniel E-mail: dbaumann@damtp.cam.ac.uk

    2016-02-01

    We provide a statistical framework for characterizing stochastic particle production in the early universe via a precise correspondence to current conduction in wires with impurities. Our approach is particularly useful when the microphysics is uncertain and the dynamics are complex, but only coarse-grained information is of interest. We study scenarios with multiple interacting fields and derive the evolution of the particle occupation numbers from a Fokker-Planck equation. At late times, the typical occupation numbers grow exponentially which is the analog of Anderson localization for disordered wires. Some statistical features of the occupation numbers show hints of universality in the limit of a large number of interactions and/or a large number of fields. For test cases, excellent agreement is found between our analytic results and numerical simulations.

  5. 29 CFR 1910.304 - Wiring design and protection.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... electric furnaces for melting, refining, tempering, and the like; (B) If the system is separately derived..., DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.304 Wiring design and protection. (a) Use and identification of grounded and...

  6. Wiring for aerospace applications

    NASA Technical Reports Server (NTRS)

    Christian, J. L., Jr.; Dickman, J. E.; Bercaw, R. W.; Myers, I. T.; Hammoud, A. N.; Stavnes, M.; Evans, J.

    1992-01-01

    In this paper, the authors summarize the current state of knowledge of arc propagation in aerospace power wiring and efforts by the National Aeronautics and Space Administration (NASA) towards the understanding of the arc tracking phenomena in space environments. Recommendations will be made for additional testing. A database of the performance of commonly used insulating materials will be developed to support the design of advanced high power missions, such as Space Station Freedom and Lunar/Mars Exploration.

  7. Superconducting magnet wire

    DOEpatents

    Schuller, Ivan K.; Ketterson, John B.; Banerjee, Indrajit

    1986-01-01

    A superconducting tape or wire with an improved critical field is formed of alternating layers of a niobium-containing superconductor such as Nb, NbTi, Nb.sub.3 Sn or Nb.sub.3 Ge with a thickness in the range of about 0.5-1.5 times its coherence length, supported and separated by layers of copper with each copper layer having a thickness in the range of about 170-600 .ANG..

  8. Printed wiring assembly cleanliness

    SciTech Connect

    Stephens, J.M.

    1992-12-01

    This work installed a product cleanliness test capability in a manufacturing environment. A previously purchased testing device was modified extensively and installed in a production department. The device, the testing process, and some soldering and cleaning variables were characterized to establish their relationship to the device output. The characterization provided information which will be required for cleanliness testing to be an adequate process control of printed wiring assembly soldering and cleaning processes.

  9. Plated wire memory subsystem

    NASA Technical Reports Server (NTRS)

    Reynolds, L.; Tweed, H.

    1972-01-01

    The work performed entailed the design, development, construction and testing of a 4000 word by 18 bit random access, NDRO plated wire memory for use in conjunction with a spacecraft imput/output unit and central processing unit. The primary design parameters, in order of importance, were high reliability, low power, volume and weight. A single memory unit, referred to as a qualification model, was delivered.

  10. Impact Wire Dislodges Obstructions

    NASA Technical Reports Server (NTRS)

    Ricklefs, Steven K.; Anders, Jeffrey E.

    1990-01-01

    Snakelike tool loosens trapped debris obstructing narrow passages in normally inaccessible locations. Flexible tool threaded into obstructed channel, much like common plumbing snake. Wire fed along inner tube of tool until tip reaches obstruction. Delivers impact from impact tool to obstruction. Designed for use in narrow, intricate coolant channels of rocket engine. Lends itself readily to modification for use in engine blocks, heat exchangers, general plumbing, and like.

  11. Overhead camshaft engine valve train with slack take up means

    SciTech Connect

    Hayashi, Y.

    1987-03-03

    A valve train of an overhead camshaft engine is described comprising: a valve stem; a valve operating cam; a rocker arm operatively engaged with the valve stem and the cam for transferring motion from the cam to the valve stem and having at a part where it is operatively engaged with the cam a hole; a tappet reciprocatingly mounted in the hole in a manner to define an oil pressure chamber variable in volume in accordance with actual movement of the tappet and having an end protruding from the rocker arm to contact the cam; a source of pressurized oil; passageway means for providing communication between the source of pressurized oil and the oil pressure chamber; check valve means operatively connected with the passageway means for preventing a return flow out of the oil pressure chamber; a spring disposed in the oil pressure chamber to urge the tappet in the direction causing the oil pressure chamber to increase in volume to thereby take up slack in the valve train; and an oil releasing passageway having one end opening directly into the uppermost part of the oil pressure chamber and another end opening to the outside of the rocker arm.

  12. Soft-light overhead illumination systems improve laparoscopic task performance.

    PubMed

    Takai, Akihiro; Takada, Yasutsugu; Motomura, Hideki; Teramukai, Satoshi

    2014-02-01

    The aim of this study was to evaluate the impact of attached shadow cues for laparoscopic task performance. We developed a soft-light overhead illumination system (SOIS) that produced attached shadows on objects. We compared results using the SOIS with those using a conventional illumination system with regard to laparoscopic experience and laparoscope-to-target distances (LTDs). Forty-two medical students and 23 surgeons participated in the study. A peg transfer task (LTD, 120 mm) for students and surgeons, and a suture removal task (LTD, 30 mm) for students were performed. Illumination systems were randomly assigned to each task. Endpoints were: total number of peg transfers; percentage of peg-dropping errors; and total execution time for suture removal. After the task, participants filled out a questionnaire on their preference for a particular illumination system. Total number of peg transfers was greater with the SOIS for both students and surgeons. Percentage of peg-dropping errors for surgeons was lower with the SOIS. Total execution time for suture removal was shorter with the SOIS. Forty-five participants (69% in total) evaluated the SOIS for easier task performance. The present results confirm that the SOIS improves laparoscopic task performance, regardless of previous laparoscopic experience or LTD.

  13. Magnetoconductance of quantum wires

    NASA Astrophysics Data System (ADS)

    Ferreira, Gerson J.; Sammarco, Filipe; Egues, Carlos

    2010-03-01

    At low temperatures the conductance of a quantum wires exhibit characteristic plate-aus due to the quantization of the transverse modes [1]. In the presence of high in-plane magnetic fields these spin-split transverse modes cross. Recently, these crossings were observed experimentally [2] via measurements of the differential conductance as a function of the gate voltage and the in-plane magnetic-field. These show structures described as either anti-crossings or magnetic phase transitions. Motivated by our previous works on magnetotransport in 2DEGs via the Spin Density Functional Theory (SDFT) [3], here we propose a similar model to investigate the magnetoconductance of quantum wires. We use (i) the SDFT via the Kohn-Sham self-consistent scheme within the local spin density approximation to obtain the electronic structure and (ii) the Landauer-Buettiker formalism to calculate the conductance of a quantum wire. Our results show qualitative agreement with the data of Ref. [2]. [1] B. J. van Wees et al., Phys. Rev. Lett. 60, 848 (1988). [2] A. C. Graham et al., Phys. Rev. Lett. 100, 226804 (2008). [3] H. J. P. Freire, and J. C. Egues, Phys. Rev. Lett. 99, 026801 (2007); G. J. Ferreira, and J. Carlos Egues, J. Supercond. Nov. Mag., in press; G. J. Ferreira, H. J. P. Freire, J. Carlos Egues, submitted.

  14. Autonomous Command Operations of the WIRE Spacecraft

    NASA Technical Reports Server (NTRS)

    Walyus, Keith; Prior, Mike; Saylor, Richard

    1999-01-01

    This paper presents operational innovations which will be introduced on NASA's Wide Field Infrared Explorer (WIRE) mission. These innovations include an end-to-end design architecture for an autonomous commanding capability for the uplink of command loads during unattended station contacts. The WIRE mission is the fifth and final mission of NASA's Goddard Space Flight Center Small Explorer (SMEX) series to be launched in March of 1999. Its primary mission is the targeting of deep space fields using an ultra-cooled infrared telescope. Due to its mission design WIRE command loads are large (approximately 40 Kbytes per 24 hours) and must be performed daily. To reduce the cost of mission operations support that would be required in order to uplink command loads, the WIRE Flight Operations Team has implemented all autonomous command loading capability. This capability allows completely unattended operations over a typical two-day weekend period. The key factors driving design and implementation of this capability were: 1) integration with already existing ground system autonomous capabilities and systems, 2) the desire to evolve autonomous operations capabilities based upon previous SMEX operations experience - specifically the TRACE mission, 3) integration with ground station operations - both autonomous and man-tended, 4) low cost and quick implementation, and 5) end-to-end system robustness. A trade-off study was performed to examine these factors in light of the low-cost, higher-risk SMEX mission philosophy. The study concluded that a STOL (Spacecraft Test and Operations Language) based script, highly integrated with other scripts used to perform autonomous operations, was best suited given the budget and goals of the mission. Each of these factors is discussed in addition to use of the TRACE mission as a testbed for autonomous commanding prior to implementation on WIRE. The capabilities implemented on the WIRE mission are an example of a low-cost, robust, and

  15. Autonomous Command Operations of the WIRE Spacecraft

    NASA Technical Reports Server (NTRS)

    Walyus, Keith; Prior, Mike; Saylor, Richard

    1999-01-01

    This paper presents operational innovations which will be introduced on NASA's Wide Field Infrared Explorer (WIRE) mission. These innovations include an end-to-end design architecture for an autonomous commanding capability for the uplink of command loads during unattended station contacts. The WIRE mission is the fifth and final mission of NASA's Goddard Space Flight Center Small Explorer (SMEX) series to be launched in March of 1999. Its primary mission is the targeting of deep space fields using an ultra-cooled infrared telescope. Due to its mission design WIRE command loads are large (approximately 40 Kbytes per 24 hours) and must be performed daily. To reduce the cost of mission operations support that would be required in order to uplink command loads, the WIRE Flight Operations Team has implemented all autonomous command loading capability. This capability allows completely unattended operations over a typical two-day weekend period. The key factors driving design and implementation of this capability were: 1) integration with already existing ground system autonomous capabilities and systems, 2) the desire to evolve autonomous operations capabilities based upon previous SMEX operations experience - specifically the TRACE mission, 3) integration with ground station operations - both autonomous and man-tended, 4) low cost and quick implementation, and 5) end-to-end system robustness. A trade-off study was performed to examine these factors in light of the low-cost, higher-risk SMEX mission philosophy. The study concluded that a STOL (Spacecraft Test and Operations Language) based script, highly integrated with other scripts used to perform autonomous operations, was best suited given the budget and goals of the mission. Each of these factors is discussed in addition to use of the TRACE mission as a testbed for autonomous commanding prior to implementation on WIRE. The capabilities implemented on the WIRE mission are an example of a low-cost, robust, and

  16. A digital fly-by-wire technology development program using an F-8C test aircraft

    NASA Technical Reports Server (NTRS)

    Jarvis, C. R.

    1974-01-01

    A digital fly-by-wire flight control system has been installed in an F-8C test airplane and has undergone extensive ground and flight testing as part of an overall program to develop digital fly-by-wire technology. This is the first airplane to fly with a digital fly-by-wire system as its primary means of control and with no mechanical reversion capability. Forty-two test flights were made for a total flight time of 57 hours. Six pilots participated in the evaluation. This paper presents an overview of the digital fly-by-wire program and discusses some of the flight-test results.

  17. Fatigue during prolonged intermittent overhead work: reliability of measures and effects of working height.

    PubMed

    Sood, Deepti; Nussbaum, Maury A; Hager, Kris

    2007-04-01

    Shoulder pain is prevalent among industrial workers and existing evidence supports that overhead work is an important specific risk factor. Existing guidelines are limited, with overhead work typically recommended to be avoided, and research on overhead work has been mixed in terms of the effects of increasing arm reach. A laboratory-based simulation of overhead work was conducted, at three working heights, in order to facilitate improved guidelines and to identify potential non-linear effects of overhead work height. Several indicators of shoulder fatigue served as outcome measures and a preliminary study was performed to assess the reliability of several of these measures. Fatigue measures based on electromyography (EMG) generally had low reliability, whereas excellent reliability was exhibited for ratings of perceived discomfort (RPD). Consistent with this, no effects of overhead work height were found on EMG-based measures, yet clear non-linear effects were found on RPD and task performance. The source of the effects of work height appeared to be related to a combination of muscle activation levels and demands on precision/control at the highest location. These results support the utility of subjective measures for relatively low-level intermittent exertions and demonstrate increasingly detrimental fatigue and performance effects at extremes in reach during overhead work.

  18. Dual wire welding torch and method

    DOEpatents

    Diez, Fernando Martinez; Stump, Kevin S.; Ludewig, Howard W.; Kilty, Alan L.; Robinson, Matthew M.; Egland, Keith M.

    2009-04-28

    A welding torch includes a nozzle with a first welding wire guide configured to orient a first welding wire in a first welding wire orientation, and a second welding wire guide configured to orient a second welding wire in a second welding wire orientation that is non-coplanar and divergent with respect to the first welding wire orientation. A method of welding includes moving a welding torch with respect to a workpiece joint to be welded. During moving the welding torch, a first welding wire is fed through a first welding wire guide defining a first welding wire orientation and a second welding wire is fed through a second welding wire guide defining a second welding wire orientation that is divergent and non-coplanar with respect to the first welding wire orientation.

  19. 29 CFR 1926.1003 - Overhead protection for operators of agricultural and industrial tractors used in construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... REGULATIONS FOR CONSTRUCTION Rollover Protective Structures; Overhead Protection § 1926.1003 Overhead...) Purpose. When overhead protection is provided on wheel-type agricultural and industrial tractors, the... accidental upset. (2) Applicability. This standard applies to wheel-type agricultural and industrial...

  20. 29 CFR 1926.1003 - Overhead protection for operators of agricultural and industrial tractors used in construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... REGULATIONS FOR CONSTRUCTION Rollover Protective Structures; Overhead Protection § 1926.1003 Overhead...) Purpose. When overhead protection is provided on wheel-type agricultural and industrial tractors, the... accidental upset. (2) Applicability. This standard applies to wheel-type agricultural and industrial...

  1. 29 CFR 1926.1003 - Overhead protection for operators of agricultural and industrial tractors used in construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... REGULATIONS FOR CONSTRUCTION Rollover Protective Structures; Overhead Protection § 1926.1003 Overhead...) Purpose. When overhead protection is provided on wheel-type agricultural and industrial tractors, the... accidental upset. (2) Applicability. This standard applies to wheel-type agricultural and industrial...

  2. 29 CFR 1926.1003 - Overhead protection for operators of agricultural and industrial tractors used in construction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... REGULATIONS FOR CONSTRUCTION Rollover Protective Structures; Overhead Protection § 1926.1003 Overhead...) Purpose. When overhead protection is provided on wheel-type agricultural and industrial tractors, the... accidental upset. (2) Applicability. This standard applies to wheel-type agricultural and industrial...

  3. 78 FR 68477 - Overhead and Gantry Cranes; Extension of the Office of Management and Budget's (OMB) Approval of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-14

    ... Occupational Safety and Health Administration Overhead and Gantry Cranes; Extension of the Office of Management...) approval of the information collection requirements specified in the Standard on Overhead and Gantry Cranes... Standard on Overhead and Gantry Cranes specify requirements for: Marking the rated load of cranes; and...

  4. Matrix Interconnection System for Aircraft Wiring

    DTIC Science & Technology

    1975-07-01

    Aircraft Wiring, ECOM-0102-1, Feb. I973 mmmmMam "" \\:.-JLl.- *"’" " ’^nf--’--^7 -w .mm-m .mm BSU! (2) obtain due to the classified nature of the...steps 2 and 3 of MODE 2 to operate the intercoms. 2’ TTpe gtpp 1 of MODE 3 tn opprnte the compass. Do not rotate the SITS, MODE 10 This test is to be...TABLE II TABLE III TABLE IV MODES OF OPERATION MATRIX OH- GA HELICOPTER EMC EVALUATION OH- GA HELICOPTER EMC EVALUATION TEST SUMMARY GROUND TEST

  5. Manually Operated Welding Wire Feeder

    NASA Technical Reports Server (NTRS)

    Rybicki, Daniel J. (Inventor)

    2001-01-01

    A manual welding wire feeder apparatus comprising a bendable elongate metal frame with a feed roller mounted at the center thereof for rotation about an axis transverse to the longitudinal axis of the frame. The frame ends are turned up as tabs and each provided with openings in alignment with each other and the mid-width center of the roller surface. The tab openings are sized to accommodate welding wire and each extends to a side edge of the tab, both opening on the same side of the frame, whereby welding wire can be side-loaded onto the frame. On the side of the frame, opposite the roller a lock ring handle is attached tangentially and is rotatable about the attachment point and an axis perpendicular to the frame. The device is grasped in the hand normally used to hold the wire. A finger is placed through the loop ring and the frame positioned across the palm and lower fingers. The thumb is positioned atop the wire so it can be moved from the back of the frame across the roller, and towards the front. In doing so, the wire is advanced at a steady rate in axial alignment with the tab openings and roller. To accommodate different wire diameters the frame is bendable about its center in the plane of the frame axis and wire so as to keep the wire in sufficient tension against the roller and to keep the wire fixed when the frame is tilted and thumb pressure released.

  6. 49 CFR 234.213 - Grounds.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Grounds. 234.213 Section 234.213 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF... internal to semiconductor-based memory; and (5) Common return wires of grounded common return single...

  7. Current Concepts in the Evaluation and Treatment of the Shoulder in Overhead Throwing Athletes, Part 2

    PubMed Central

    Reinold, Michael M.; Gill, Thomas J.; Wilk, Kevin E.; Andrews, James R.

    2010-01-01

    The overhead throwing athlete is an extremely challenging patient in sports medicine. The repetitive microtraumatic stresses imposed on the athlete’s shoulder joint complex during the throwing motion constantly place the athlete at risk for injury. Treatment of the overhead athlete requires the understanding of several principles based on the unique physical characteristics of the overhead athlete and the demands endured during the act of throwing. These principles are described and incorporated in a multiphase progressive rehabilitation program designed to prevent injuries and rehabilitate the injured athlete, both nonoperatively and postoperatively. PMID:23015928

  8. Metering Wheel-Wire Track Wire Boom Deployment Mechanism

    NASA Technical Reports Server (NTRS)

    Granoff, Mark S.

    2014-01-01

    The NASA MMS Spin Plane Double Probe (SDP) Deployer utilizes a helical path, rotating Metering Wheel and a spring loaded Wire "Holding" Track to pay out a "fixed end" 57 meter x 1.5 mm diameter Wire Boom stored between concentric storage cylinders. Unlike rotating spool type storage devices, the storage cylinders remain stationary, and the boom wire is uncoiled along the length of the cylinder via the rotation of the Metering Wheel. This uncoiling action avoids the need for slip-ring contacts since the ends of the wire can remain stationary. Conventional fixed electrical connectors (Micro-D type) are used to terminate to operational electronics.

  9. The Drag of Streamline Wires

    NASA Technical Reports Server (NTRS)

    Jacobs, Eastman N

    1933-01-01

    Preliminary results are given of drag tests of streamline wires. Full-size wires were tested over a wide range of speeds in the N.A.C.A. high speed tunnel. The results are thus directly applicable to full-scale problems and include any compressibility effects encountered at the higher speeds. The results show how protuberances may be employed on conventional streamline wires to reduce the drag, and also show how the conventional wires compare with others having sections more like strut or symmetrical airfoil sections. Because the new wire sections developed are markedly superior aerodynamically to conventional wires, it is recommended that some of them be tested in service in order to investigate their relative susceptibility to vibration and to fatigue failure.

  10. Corrosion resistance of premodeled wires made of stainless steel used for heart electrotherapy leaders

    NASA Astrophysics Data System (ADS)

    Przondziono, J.; Walke, W.; Młynarski, R.; Szatka, W.

    2012-05-01

    The purpose of the study is to evaluate resistance to electrochemical corrosion of wire made of X10CrNi18-8 stainless steel designed for use in cardiology treatment. The influence of strain formed in the premodeling process and methods of wire surface preparation to corrosive resistance in artificial plasma solution were analysed. Wire corrosion tests were carried out in the solution of artificial plasma. Resistance to electrochemical corrosion was evaluated on the ground of recorded curves of anodic polarization by means of potentiodynamic method. Potentiodynamic tests carried out enabled to determine how the resistance to pitting corrosion of wire changes, depending on strain formed in the premodeling process as well as on the method of wire surface preparation. For evaluation of phenomena occurring on the surface of tested steel, electrochemical impedance spectroscopy (EIS) was applied. Deterioration of corrosive properties of wire along with the increase in the formed strain hardening was observed.

  11. Headgear Accessories Classification Using an Overhead Depth Sensor

    PubMed Central

    Luna, Carlos A.; Marron-Romera, Marta; Mazo, Manuel; Luengo-Sanchez, Sara; Macho-Pedroso, Roberto

    2017-01-01

    In this paper, we address the generation of semantic labels describing the headgear accessories carried out by people in a scene under surveillance, only using depth information obtained from a Time-of-Flight (ToF) camera placed in an overhead position. We propose a new method for headgear accessories classification based on the design of a robust processing strategy that includes the estimation of a meaningful feature vector that provides the relevant information about the people’s head and shoulder areas. This paper includes a detailed description of the proposed algorithmic approach, and the results obtained in tests with persons with and without headgear accessories, and with different types of hats and caps. In order to evaluate the proposal, a wide experimental validation has been carried out on a fully labeled database (that has been made available to the scientific community), including a broad variety of people and headgear accessories. For the validation, three different levels of detail have been defined, considering a different number of classes: the first level only includes two classes (hat/cap, and no hat/cap), the second one considers three classes (hat, cap and no hat/cap), and the last one includes the full class set with the five classes (no hat/cap, cap, small size hat, medium size hat, and large size hat). The achieved performance is satisfactory in every case: the average classification rates for the first level reaches 95.25%, for the second one is 92.34%, and for the full class set equals 84.60%. In addition, the online stage processing time is 5.75 ms per frame in a standard PC, thus allowing for real-time operation. PMID:28796177

  12. Structural health monitoring of compression connectors for overhead transmission lines

    SciTech Connect

    Wang, Hong; Wang, Jy-An John; Swindeman, Joseph P; Ren, Fei; Chan, John

    2017-01-01

    Two-stage aluminum conductor steel-reinforced (ACSR) compression connectors are extensively used in US overhead transmission lines. The connectors are made by crimping a steel sleeve onto a steel core and an aluminum sleeve over aluminum conductive strands. The connectors are designed to operate at temperatures up to 125 C, but their performance is increasingly degrading because of overloading of lines. Currently, electric utilities conduct routine line inspections using thermal and electrical measurements. However, information about the structural integrity of connectors cannot be obtained. In this work, structural health monitoring (SHM) of compression connectors was studied using electromechanical impedance (EMI) analysis. Lead zirconate titanate (PZT)-5A was identified as a smart material for SHM. A flexible high-temperature bonding layer was used to address challenges in PZT integration due to a significant difference in the coefficients of thermal expansion of PZT and the aluminum substrate. The steel joint on the steel core was investigated because it is responsible for the ultimate tensile strength of the connector. Tensile testing was used to create structural damage to the joint, or steel core pullout, and thermal cycling introduced additional structural perturbations. EMI measurements were conducted between the tests. The root mean square deviation (RMSD) of EMI was identified as a damage index. The use of steel joints has been shown to enable SHM under simulated conditions. The EMI signature is sensitive to variations in structural conditions. RMSD can be correlated to the structural health of a connector and has potential for use in the SHM and structural integrity evaluation.

  13. Predicting ice accretion and alleviating galloping on overhead power lines

    NASA Astrophysics Data System (ADS)

    Lu, Mingliang

    2002-04-01

    Both the static and dynamic effects of an ice storm on an overhead power line are investigated fairly comprehensively in this thesis. To determine the static, extreme ice load as well as the combined ice and wind load, a systematic procedure is established based on extensive freezing rain experiments and a Monte Carlo simulation. On the other hand, a dynamic effect---galloping---is examined quite extensively with the objective of better understanding its behavior. A novel add-on device---the hybrid nutation damper (HND)---is proposed to control galloping. Its effectiveness is assessed numerically by using a modified, 3DOF based, galloping software. The present investigations lead to the following findings. (i) Goodwin's simple theoretical model surprisingly predicts, quite accurately, the temporally changing weight of not only a dry ice growth but also a wet ice growth for a fixed, unheated conductor sample. (ii) The maximum ice loading may vary significantly over a power line's planned lifetime because of the randomness of an ice storm and its characteristics as well as the uncertainty involved in identifying the extreme probability distribution of the ice loading. Consequently, backup protection is presently essential for a power line in an ice prone area. (iii) A conductor's torsional flexibility does not appear to affect the growth of the accreted ice weight but it modifies the ice shape significantly. (iv) Three representative ice shapes (a crescent, D-like and icicle pendant) can initiate galloping so that galloping may occur in any icing condition. (v) A noticeable swingback or twist appears to develop only when their respective natural frequencies coincide with the plunge's natural frequency. (vi) A hydraulic jump is the major source of energy dissipation in a nutation damper. A properly induced rotation can significantly enhance a nutation damper's performance. (vii) A hybrid nutation damper has been demonstrated to be a promising means of alleviating

  14. Structural health monitoring of compression connectors for overhead transmission lines

    NASA Astrophysics Data System (ADS)

    Wang, Hong; Wang, Jy-An John; Swindeman, Joseph P.; Ren, Fei; Chan, John

    2017-04-01

    Two-stage aluminum conductor steel-reinforced (ACSR) compression connectors are extensively used in US overhead transmission lines. The connectors are made by crimping a steel sleeve onto a steel core and an aluminum sleeve over electrical conducting aluminum strands. The connectors are designed to operate at temperatures up to 125°C, but their performance is increasingly degrading because of overloading of lines. Currently, electric utilities conduct routine line inspections using thermal and electrical measurements, but these methods do not provide information about the structural integrity of connectors. In this work, structural health monitoring (SHM) of compression connectors was studied using electromechanical impedance (EMI) analysis. Lead zirconate titanate (PZT)-5A was identified as a smart material for SHM. A flexible high-temperature bonding layer was used to address challenges in PZT integration due to a significant difference in the coefficients of thermal expansion of PZT and the aluminum substrate. The steel joint on the steel core was investigated because it is responsible for the ultimate tensile strength of the connector. Tensile testing was used to induce structural damage to the joint, or steel core pullout, and thermal cycling introduced additional structural perturbations. EMI measurements were conducted between the tests. The root mean square deviation (RMSD) of EMI was identified as a damage index. The use of steel joints has been shown to enable SHM under simulated conditions. The EMI signature is sensitive to variations in structural conditions. RMSD can be correlated to the structural health of a connector and has potential for use in the SHM and structural integrity evaluation.

  15. Headgear Accessories Classification Using an Overhead Depth Sensor.

    PubMed

    Luna, Carlos A; Macias-Guarasa, Javier; Losada-Gutierrez, Cristina; Marron-Romera, Marta; Mazo, Manuel; Luengo-Sanchez, Sara; Macho-Pedroso, Roberto

    2017-08-10

    In this paper, we address the generation of semantic labels describing the headgear accessories carried out by people in a scene under surveillance, only using depth information obtained from a Time-of-Flight (ToF) camera placed in an overhead position. We propose a new method for headgear accessories classification based on the design of a robust processing strategy that includes the estimation of a meaningful feature vector that provides the relevant information about the people's head and shoulder areas. This paper includes a detailed description of the proposed algorithmic approach, and the results obtained in tests with persons with and without headgear accessories, and with different types of hats and caps. In order to evaluate the proposal, a wide experimental validation has been carried out on a fully labeled database (that has been made available to the scientific community), including a broad variety of people and headgear accessories. For the validation, three different levels of detail have been defined, considering a different number of classes: the first level only includes two classes (hat/cap, and no hat/cap), the second one considers three classes (hat, cap and no hat/cap), and the last one includes the full class set with the five classes (no hat/cap, cap, small size hat, medium size hat, and large size hat). The achieved performance is satisfactory in every case: the average classification rates for the first level reaches 95.25%, for the second one is 92.34%, and for the full class set equals 84.60%. In addition, the online stage processing time is 5.75 ms per frame in a standard PC, thus allowing for real-time operation.

  16. Diagnostics for exploding wires (abstract)

    NASA Astrophysics Data System (ADS)

    Moosman, B.; Bystritskii, Vitaly; Wessel, F. J.; Van Drie, A.

    1999-01-01

    Two diagnostics, capable of imaging fast, high temperature, plasmas were used on exploding wire experiments at UC Irvine. An atmospheric pressure nitrogen laser (λ=337.1 nm) was used to generate simultaneous shadow and shearing interferogram images with a temporal resolution of ˜1 ns and a spatial resolution of 10 μm. An x-ray backlighter imaged the exploding wire 90° with respect to the laser and at approximately the same instant in time. The backlighter spatial resolution as determined by geometry and film resolution was 25 μm. Copper wires of diameters (25, 50, and 100 μm) and steel wire d=25 μm were exploded in vacuum (10-5 Torr) at a maximum current level of 12 kA, by a rectified marx bank at a voltage of 50 kV and a current rise time (quarter period) of 900 ns. Copper wires which were cleaned and then resistively heated under vacuum to incandescence for several hours prior to high current initiation, exhibited greater expansion velocities at peak current than wires which had not been heated prior to discharge. Axial variations on the surface of the wire observed with the laser were found to correlate with bulk axial mass differences from x-ray backlighting. High electron density, measured near the opaque surface of the exploding wire, suggests that much of the current is shunted outward away from the bulk of the wire.

  17. Texture development in Galfenol wire

    NASA Astrophysics Data System (ADS)

    Boesenberg, A. J.; Restorff, J. B.; Wun-Fogle, M.; Sailsbury, H.; Summers, E.

    2013-05-01

    Galfenol (Fe-Ga alloy) wire fabrication provides a low cost alternative to directional solidification methods. This work evaluates the compositional dependence of the wire drawing suitability of Fe-Ga and characterizes the microstructural and magnetic properties of these wires. Wire has been produced with Ga contents between 10 at. % and 17 at. % to allow determination of the ductile to brittle transition (DTBT) in wire manufacture. Published results on chill cast bend specimens indicated that a DTBT occurs at roughly 15 at. % Ga. This DTBT was observed under tensile loading with a corresponding change in fracture behavior from transverse fracture to intergranular fracture. For improved magnetostrictive performance, higher Ga contents are desired, closer to the 17 at. % Ga evaluated in this work. Electron backscattered diffraction B-H loop and resonance measurements as a function of magnetic field (to determine modulus and coupling factor) are presented for as-drawn, furnace, and direct current (DC) annealed wire. Galfenol wire produced via traditional drawing methods is found to have a strong <110> (α) texture parallel to the drawing direction. As-drawn wire was observed to have a lower magnetic permeability and larger hysteresis than DC annealed wire. This is attributed to the presence of a large volume of crystalline defects; such as vacancies and dislocations.

  18. Subminiature Hot-Wire Probes

    NASA Technical Reports Server (NTRS)

    Westphal, R. V.; Lemos, F. R.; Ligrani, P. M.

    1989-01-01

    Class of improved subminiature hot-wire flow-measuring probes developed. Smaller sizes yield improved resolution in measurements of practical aerodynamic flows. Probe made in one-wire, two-perpendicular-wire, and three-perpendicular-wire version for measurement of one, two, or all three components of flow. Oriented and positioned on micromanipulator stage and viewed under microscope during fabrication. Tested by taking measurements in constant-pressure turbulent boundary layer. New probes give improved measurements of turbulence quantities near surfaces and anisotropies of flows strongly influence relative errors caused by phenomena related to spatial resolution.

  19. Plasma Formation Around Single Wires

    NASA Astrophysics Data System (ADS)

    Duselis, Peter U.; Kusse, Bruce R.

    2002-12-01

    At Cornell's Laboratory of Plasma Studies, single wires of various metals were exploded using a ˜250 ns pulser with a rise time of ˜20 A/ns. It was found that the wires first experience a resistive heating phase that lasts 50-80 ns before a rapid collapse of voltage. From that point on, the voltage across the wire was negligible while the current through the wire continued to increase. We attribute this voltage collapse to the formation of plasma about the wire. Further confirmation of this explanation will be presented along with new experimental data describing preliminary spectroscopy results, the expansion rate of the plasma, and current flow along the wire as a function of radius. The resistance of the wire-electrode connection will be shown to significantly affect the energy deposition. Various diagnostics were used to obtain these experiments. Ultraviolet sensitive vacuum photodiodes and a framing camera with an 8 ns shutter were used to detect and measure the width of the visible light emitted by the plasma. A special wire holder was constructed that allowed the transfer of current from the wire to the surrounding plasma to be observed.

  20. Plated wire memory subsystem

    NASA Technical Reports Server (NTRS)

    Carpenter, K. H.

    1974-01-01

    The design, construction, and test history of a 4096 word by 18 bit random access NDRO Plated Wire Memory for use in conjunction with a spacecraft input/output and central processing unit is reported. A technical and functional description is given along with diagrams illustrating layout and systems operation. Test data is shown on the procedures and results of system level and memory stack testing, and hybrid circuit screening. A comparison of the most significant physical and performance characteristics of the memory unit versus the specified requirements is also included.