Experimental study on mean overtopping of sloping seawall under oblique irregular waves
NASA Astrophysics Data System (ADS)
Wang, Deng-ting; Ju, Lie-hong; Zhu, Jia-ling; Wang, Zhen; Sun, Tian-ting; Chen, Wei-qiu
2017-06-01
In this paper, domestic and abroad research progresses and related calculation formulae of the mean overtopping discharge are summarized. Through integral physical model experiments, the relation between the wave direction and the overtopping discharge on the top of the sloping dike is focused on and put into analysis and discussion; and a modified formula for mean overtopping discharges under oblique irregular waves is proposed. The study shows that the mean overtopping discharge generally goes down as the relative wave obliquity β increases for a fixed measurement point and the mean overtopping discharge generally increases as the wave steepness H/L decreases (the cycle increases) for a fixed relative wave obliquity.
Thirty-year assessment of released, overtopped white oaks
C. Miller; S. Grayson; A. Houser; W. Clatterbuck; K. Kuers
2011-01-01
White oak (Quercus alba L.) is a slow-growing species that is often overtopped in the mixed upland hardwood forests of the Cumberland Plateau. Forest managers have concerns about the potential economic value of releasing overtopped white oaks to become valuable crop trees. This study follows the growth and development of 104 overtopped white oaks...
Response of Overtopped White Oak to Release
Charles E. McGee
1981-01-01
Pole sized white oaks increase in volume growth following release from overtopping trees, but the response varies by size, age and appearance of the oaks. Significant increases in epicormic sprouting, height loss by some released trees, and highly variable stem volume growth make overtopped white oak a very questionable source of future crop trees. If overtopped trees...
Role of beach morphology in wave overtopping hazard assessment
NASA Astrophysics Data System (ADS)
Phillips, Benjamin; Brown, Jennifer; Bidlot, Jean-Raymond; Plater, Andrew
2017-04-01
Understanding the role of beach morphology in controlling wave overtopping volume will further minimise uncertainties in flood risk assessments at coastal locations defended by engineered structures worldwide. XBeach is used to model wave overtopping volume for a 1:200 yr joint probability distribution of waves and water levels with measured, pre- and post-storm beach profiles. The simulation with measured bathymetry is repeated with and without morphological evolution enabled during the modelled storm event. This research assesses the role of morphology in controlling wave overtopping volumes for hazardous events that meet the typical design level of coastal defence structures. Results show disabling storm-driven morphology under-represents modelled wave overtopping volumes by up to 39% under high Hs conditions, and has a greater impact on the wave overtopping rate than the variability applied within the boundary conditions due to the range of wave-water level combinations that meet the 1:200 yr joint probability criterion. Accounting for morphology in flood modelling is therefore critical for accurately predicting wave overtopping volumes and the resulting flood hazard and to assess economic losses.
Design considerations for embankment protection during road overtopping events : final report.
DOT National Transportation Integrated Search
2017-06-01
This report describes the research conducted by the University of Minnesota and project partners on roadway embankment overtopping by flood water. Roadway overtopping is a major safety concern for Minnesota transportation managers because of the pote...
Wave Overtopping of a Barrier Beach
NASA Astrophysics Data System (ADS)
Thornton, E. B.; Laudier, N.; Macmahan, J. H.
2009-12-01
The rate of wave overtopping of a barrier beach is measured and modeled as a first step in modeling the breaching of a beach impounding an ephemeral river. Unique rate of wave overtopping data are obtained from the measure of the Carmel River, California, lagoon filling during a time when the lagoon is closed-off and there is no river inflow. Volume changes are calculated from measured lagoon height changes owing to wave overtopping by a stage-volume curve, then center differenced and averaged to provide volume rates of change in the lagoon. Wave height and period are obtained from CDIP MOPS directional wave spectra data in 15m fronting the beach. Beach morphology was measured by GPS walking surveys and interpolated for beach slopes and berm heights. Three empirical overtopping models by van der Meer and Janssen (1995), Hedges and Reis (1998) and Pullen et al. (2007) with differing parameterizations on wave height, period and beach slope and calibrated using extensive laboratory data obtained over plane, impermeable beaches are compared with the data. In addition, the run-up model by Stockdon et al. (2006) based on field data is examined. Three wave overtopping storm events are considered when morphology data were available less than 2 weeks prior to the event. The models are tuned to fit the data using a reduction factor to account for beach permeability, berm characteristics, non-normal wave incidence and surface roughness influence. It is concluded that the Stockdon et al. (2006) model underestimates run-up as no overtopping is predicted with this model. The three empirical overtopping models behaved similarly well with regression coefficients ranging 0.72 to 0.86 using a reasonable range of reduction factors 0.66 - 0.81 with an average of 0.74.
NASA Astrophysics Data System (ADS)
Park, Sang Kil; Dodaran, Asgar Ahadpour; Han, Chong Soo; Shahmirzadi, Mohammad Ebrahim Meshkati
2014-12-01
Rubble mound breakwaters protect the coastal line against severe erosion caused by wave action. This study examined the performance of different sizes and properties (i.e. height of vertical wall and tetrapod size) of rubble mound breakwaters on reducing the overtopping discharge. The physical model used in this study was derived based on an actual rubble mound in Busan Yacht Harbor. This research attempts to fill the gap in practical knowledge on the combined effect of the armor roughness and vertical wall on wave overtopping in rubble mound breakwaters. The main governing parameters used in this study were the vertical wall height, variation of the tetrapod weights, initial water level elevation, and the volume of overtopping under constant wave properties. The experimental results showed that the roughness factor differed according to the tetrapod size. Furthermore, the overtopping discharge with no vertical wall was similar to that with relatively short vertical walls ( 1 γv = 1). Therefore, the experimental results highlight the importance of the height of the vertical wall in reducing overtopping discharge. Moreover, a large tetrapod size may allow coastal engineers to choose a shorter vertical wall to save cost, while obtaining better performance.
NASA Astrophysics Data System (ADS)
Kemp, J. O. G.; Froneman, P. W.
2004-11-01
The composition and short-term temporal variation in the ichthyofauna and macrozooplankton entering the temporarily open/closed (TOC) West Kleinemond estuary (33°33'S, 27°02'E) during 7 overtopping events were investigated in June 2003. A total of 84 fish representing 7 taxa from 6 families and 456 macrozooplankton representing at least 16 species was collected from water overtopping the sandbar using a custom-built funnel trap (150 μm mesh). Larvae of estuarine dependant marine species, especially the sparid, Rhabdosargus holubi, which contributed 54% to the total fish catch, dominated the ichthyofauna. Also well represented among the ichthyofauna were Monodactylus falciformis and Mugilidae spp., which together accounted for a further 40% of the total fish catch. Among the macrozooplankton, larvae of Palaemon peringueyi and the mysid Mesopodopsis wooldridgei dominated numerically and by biomass. Numerical analyses using multidimensional scaling (MDS) revealed variability in the overtopping community on a diel scale. It is suggested that recruitment through overtopping is essentially a passive process governed by the physical environment with the composition of the recruiting community being a function of the patchy dynamics of surf zone plankton. Preliminary estimates indicate that an hour-long period of overtopping over spring high tide is capable of introducing between 8000 and 33 500 individuals of R. holubi into the TOC West Kleinemond estuary. The advantages and disadvantages of recruitment using overtopping events as well as impacts on the estuarine foodweb are discussed.
Release of Oregon white oak from overtopping Douglas-fir: effects on soil water and microclimate.
W.D. Devine; C.A. Harrington
2007-01-01
Many former Oregon white oak woodland and savanna stands in the coastal Pacific Northwest have been invaded and subsequently overtopped by Douglas-fir during the past century. We examined soil water and microclimate conditions near overtopped oak trees and near oak trees that had been released from Douglas-fir. In each of the three study years, volumetric soil water...
Hydrodynamics of the Semi-Immersed Cylinder by Forced Oscillation Model Testing
NASA Astrophysics Data System (ADS)
Song, Chun-hui; Fu, Shi-xiao; Tang, Xiao-ying; Hu, Ke; Ma, Lei-xin; Ren, Tong-xin
2018-03-01
In this paper, the hydrodynamic coefficients of a horizontal semi-immersed cylinder in steady current and oscillatory flow combining with constant current are obtained via forced oscillation experiments in a towing tank. Three nondimensional parameters ( Re, KC and Fr) are introduced to investigate their effects on the hydrodynamic coefficients. The experimental results show that overtopping is evident and dominates when the Reynolds number exceeds 5×105 in the experiment. Under steady current condition, overtopping increases the drag coefficient significantly at high Reynolds numbers. Under oscillatory flow with constant current condition, the added mass coefficient can even reach a maximum value about 3.5 due to overtopping while the influence of overtopping on the drag coefficient is minor.
1991-09-01
Army (i #Awleable) Engineer istrict. Walls Welli NPW-EN- GI _____________________ Bc DRSSW4~Sse.adZPa 10 SOURCE OF FUNDING NUMBERS Bldg. 602, City...cracks induced by ground motions. Z. Overtopping of dam due to seiches in reservoir. h. Overtopping of dam due to slides or rockfalls into reservoir. j...overtopping due to slides or rockfalls is not likely. Three potential modes of failure remain from the original list: (c) slope failures induced by
1978-11-01
the - full PMF. The selected TF inflow of 16,000 cfs results in a discharge at the dam of 12,460 cfs . Since the maximum capacity .* of the dam prior...to overtopping is only approximately 640 cfs , the TF would overtop the dam by over 4 feet. The dam is in POOR condition at the present time, due...accompanied the hurricane of 1938 and resulted [- in the dam being overtopped by two feet. This lake level indicates a discharge of approximately 4500 cfs
Risk-based planning analysis for a single levee
NASA Astrophysics Data System (ADS)
Hui, Rui; Jachens, Elizabeth; Lund, Jay
2016-04-01
Traditional risk-based analysis for levee planning focuses primarily on overtopping failure. Although many levees fail before overtopping, few planning studies explicitly include intermediate geotechnical failures in flood risk analysis. This study develops a risk-based model for two simplified levee failure modes: overtopping failure and overall intermediate geotechnical failure from through-seepage, determined by the levee cross section represented by levee height and crown width. Overtopping failure is based only on water level and levee height, while through-seepage failure depends on many geotechnical factors as well, mathematically represented here as a function of levee crown width using levee fragility curves developed from professional judgment or analysis. These levee planning decisions are optimized to minimize the annual expected total cost, which sums expected (residual) annual flood damage and annualized construction costs. Applicability of this optimization approach to planning new levees or upgrading existing levees is demonstrated preliminarily for a levee on a small river protecting agricultural land, and a major levee on a large river protecting a more valuable urban area. Optimized results show higher likelihood of intermediate geotechnical failure than overtopping failure. The effects of uncertainty in levee fragility curves, economic damage potential, construction costs, and hydrology (changing climate) are explored. Optimal levee crown width is more sensitive to these uncertainties than height, while the derived general principles and guidelines for risk-based optimal levee planning remain the same.
Earthern embankment overtopping analysis using the WinDAM B software
USDA-ARS?s Scientific Manuscript database
Over 11,000 small watershed dams have been constructed with USDA involvement over an eighty year period. WinDAM B software has been developed to help engineers address dam safety concerns relative to potential overtopping of these earthen embankments. The primary function of the software is threef...
A practical guide to oak release.
Constance A. Harrington; Warren D. Devine
2006-01-01
Oregon white oak savannas and woodlands represent a biological and cultural legacy in the Pacific Northwest. Many Oregon white oak stands are deteriorating owing to invasion and eventual overtopping by Douglas-fir or other conifers. Releasing the shade-intolerant oak trees from overtopping conifers can often restore these oak stands. When planning a release operation,...
John F., Jr. Thompson; Larry E. Nix
1995-01-01
After clearcuting in bottomlands, oak seedlings that naturally regenerate are often overtopped by woody pioneer species, sprouts and herbaceous material. To improve the competitive status of three- to four-year-old oak seedlings in two bottomland stands in South Carolina, several herbicides and methods of application were used to kill and/or stunt the overtopping...
Nagashima, Hisae; Hikosaka, Kouki
2011-07-01
Although being tall is advantageous in light competition, plant height growth is often similar among dominant plants in crowded stands (height convergence). Previous theoretical studies have suggested that plants should not overtop neighbours because greater allocation to supporting tissues is necessary in taller plants, which in turn lowers leaf mass fraction and thus carbon gain. However, this model assumes that a competitor has the same potential of height growth as their neighbours, which does not necessarily account for the fact that height convergence occurs even among individuals with various biomass. Stands of individually potted plants of Chenopodium album were established, where target plants were lifted to overtop neighbours or lowered to be overtopped. Lifted plants were expected to keep overtopping because they intercept more light without increased allocation to stems, or to regulate their height to similar levels of neighbours, saving biomass allocation to the supporting organ. Lowered plants were expected to be suppressed due to the low light availability or to increase height growth so as to have similar height to the neighbours. Lifted plants reduced height growth in spite of the fact that they received higher irradiance than others. Lowered plants, on the other hand, increased the rate of stem elongation despite the reduced irradiance. Consequently, lifted and lowered plants converged to the same height. In contrast to the expectation, lifted plants did not increase allocation to leaf mass despite the decreased stem length. Rather, they allocated more biomass to roots, which might contribute to improvement of mechanical stability or water status. It is suggested that decreased leaf mass fraction is not the sole cost of overtopping neighbours. Wind blowing, which may enhance transpiration and drag force, might constrain growth of overtopping plants. The results show that plants in crowded stands regulate their height growth to maintain similar height to neighbours even when they have potential advantages in height growth. This might contribute to avoidance of stresses caused by wind blowing.
W.D. Devine; C.A. Harrington
2006-01-01
Oregon white oak woodlands and savannas in the Puget Sound Region have been dramatically reduced in area owing in part to the invasion and eventual dominance of Douglas-fir in oak stands after Native American burning practices ended. We initiated a study in 2001 to examine the response of overtopped oaks to three types of release (full, partial, control) from Douglas-...
Seawalls, Bulkheads and Quaywalls. Design Manual 25.4.
1981-07-01
slopes, such as concrete block revetment , also can result in a large quantity of water overtopping the wall. Where overtopping is a serious problem...small precast units such as the concrete block revetment shown in Figure 1, type D and the precast stepped walls shown in Figure 1, types E and G, should...16. DISTRIBUTION STATEMENT (of this Report) Unclassified/Unlimited ..... 17. DISTRIBUTION STATEMENT (of the abstract entered In Block 20, if different
How well can wave runup be predicted? comment on Laudier et al. (2011) and Stockdon et al. (2006)
Plant, Nathaniel G.; Stockdon, Hilary F.
2015-01-01
Laudier et al. (2011) suggested that there may be a systematic bias error in runup predictions using a model developed by Stockdon et al. (2006). Laudier et al. tested cases that sampled beach and wave conditions that differed from those used to develop the Stockdon et al. model. Based on our re-analysis, we found that in two of the three Laudier et al. cases observed overtopping was actually consistent with the Stockdon et al. predictions. In these cases, the revised predictions indicated substantial overtopping with, in one case, a freeboard deficit of 1 m. In the third case, the revised prediction had a low likelihood of overtopping, which reflected a large uncertainty due to wave conditions that included a broad and bi-modal frequency distribution. The discrepancy between Laudier et al. results and our re-analysis appear to be due, in part, to simplifications made by Laudier et al. when they implemented a reduced version of the Stockdon et al. model.
Future Reef Growth Can Mitigate Physical Impacts of Sea-Level Rise on Atoll Islands
NASA Astrophysics Data System (ADS)
Beetham, Edward; Kench, Paul S.; Popinet, Stéphane
2017-10-01
We present new detail on how future sea-level rise (SLR) will modify nonlinear wave transformation processes, shoreline wave energy, and wave driven flooding on atoll islands. Frequent and destructive wave inundation is a primary climate-change hazard that may render atoll islands uninhabitable in the near future. However, limited research has examined the physical vulnerability of atoll islands to future SLR and sparse information are available to implement process-based coastal management on coral reef environments. We utilize a field-verified numerical model capable of resolving all nonlinear wave transformation processes to simulate how future SLR will modify wave dissipation and overtopping on Funafuti Atoll, Tuvalu, accounting for static and accretionary reef adjustment morphologies. Results show that future SLR coupled with a static reef morphology will not only increase shoreline wave energy and overtopping but will fundamentally alter the spectral composition of shoreline energy by decreasing the contemporary influence of low-frequency infragravity waves. "
Olson, Scott A.
1996-01-01
Contraction scour for all modelled flows ranged from 0.1 to 3.1 ft. The worst-case contraction scour occurred at the incipient-overtopping discharge. Abutment scour at the left abutment ranged from 10.4 to 12.5 ft with the worst-case occurring at the 500-year discharge. Abutment scour at the right abutment ranged from 25.3 to 27.3 ft with the worst-case occurring at the incipient-overtopping discharge. The worst-case total scour also occurred at the incipient-overtopping discharge. The incipient-overtopping discharge was in between the 100- and 500-year discharges. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
1979-06-01
floodwaters. About 600 feet downstream of the dam, West Mountain Road would be overtopped; 600 feet further downstream Reservoir Road would be overtopped for...removed and the surface coated to protect the pipes. . d. Reservoir Area- Notch Reservoir, as the name implies, is in a mountain notch. The area is...Brook which connects Notch Reservoir to the Hoosic River in the City of North Adams, Massachusetts, flows on a steep gradient down a mountain notch
Erosional Equivalences of Levees: Steady and Intermittent Wave Overtopping
2010-01-01
represents the proportion of the individual wave period for which the runup exceeds the levee crest. We require that the average Still Water Level1 tan α zc R... Levee Fig. 5. Definition sketch for potential wave runup. Runu p , R Centroids of Equal Runup Probabilities R m in = z c Pr ob ab ili ty D en si...Erosional equivalences of levees : Steady and intermittent wave overtopping R.G. Dean a, J.D. Rosati b, T.L. Walton c, B.L. Edge d , a Department of
NASA Astrophysics Data System (ADS)
Wei, Hui; Deng, Xiangwen; Ouyang, Shuai; Chen, Lijun; Chu, Yonghe
2017-01-01
Schima superba is an important fire-resistant, high-quality timber species in southern China. Growth in height, diameter at breast height (DBH), and volume of the three different classes (overtopped, average and dominant) of S. superba were examined in a natural subtropical forest. Four growth models (Richards, edited Weibull, Logistic and Gompertz) were selected to fit the growth of the three different classes of trees. The results showed that there was a fluctuation phenomenon in height and DBH current annual growth process of all three classes. Multiple intersections were found between current annual increment (CAI) and mean annual increment (MAI) curves of both height and DBH, but there was no intersection between volume CAI and MAI curves. All selected models could be used to fit the growth of the three classes of S. superba, with determinant coefficients above 0.9637. However, the edited Weibull model performed best with the highest R2 and the lowest root of mean square error (RMSE). S. superba is a fast-growing tree with a higher growth rate during youth. The height and DBH CAIs of overtopped, average and dominant trees reached growth peaks at ages 5-10, 10-15 and 15-20 years, respectively. According to model simulation, the volume CAIs of overtopped, average and dominant trees reached growth peaks at ages 17, 55 and 76 years, respectively. The biological rotation ages of the overtopped, average and dominant trees of S. superba were 29, 85 and 128 years, respectively.
NASA Astrophysics Data System (ADS)
Chisolm, Rachel E.; McKinney, Daene C.
2018-05-01
This paper studies the lake dynamics for avalanche-triggered glacial lake outburst floods (GLOFs) in the Cordillera Blanca mountain range in Ancash, Peru. As new glacial lakes emerge and existing lakes continue to grow, they pose an increasing threat of GLOFs that can be catastrophic to the communities living downstream. In this work, the dynamics of displacement waves produced from avalanches are studied through three-dimensional hydrodynamic simulations of Lake Palcacocha, Peru, with an emphasis on the sensitivity of the lake model to input parameters and boundary conditions. This type of avalanche-generated wave is an important link in the GLOF process chain because there is a high potential for overtopping and erosion of the lake-damming moraine. The lake model was evaluated for sensitivity to turbulence model and grid resolution, and the uncertainty due to these model parameters is significantly less than that due to avalanche boundary condition characteristics. Wave generation from avalanche impact was simulated using two different boundary condition methods. Representation of an avalanche as water flowing into the lake generally resulted in higher peak flows and overtopping volumes than simulating the avalanche impact as mass-momentum inflow at the lake boundary. Three different scenarios of avalanche size were simulated for the current lake conditions, and all resulted in significant overtopping of the lake-damming moraine. Although the lake model introduces significant uncertainty, the avalanche portion of the GLOF process chain is likely to be the greatest source of uncertainty. To aid in evaluation of hazard mitigation alternatives, two scenarios of lake lowering were investigated. While large avalanches produced significant overtopping waves for all lake-lowering scenarios, simulations suggest that it may be possible to contain waves generated from smaller avalanches if the surface of the lake is lowered.
Experimental investigation of fluvial dike breaching due to flow overtopping
NASA Astrophysics Data System (ADS)
El Kadi Abderrezzak, K.; Rifai, I.; Erpicum, S.; Archambeau, P.; Violeau, D.; Pirotton, M.; Dewals, B.
2017-12-01
The failure of fluvial dikes (levees) often leads to devastating floods that cause loss of life and damages to public infrastructure. Overtopping flows have been recognized as one of the most frequent cause of dike erosion and breaching. Fluvial dike breaching is different from frontal dike (embankments) breaching, because of specific geometry and boundary conditions. The current knowledge on the physical processes underpinning fluvial dike failure due to overtopping remains limited. In addition, there is a lack of a continuous monitoring of the 3D breach formation, limiting the analysis of the key mechanisms governing the breach development and the validation of conceptual or physically-based models. Laboratory tests on breach growth in homogeneous, non-cohesive sandy fluvial dikes due to flow overtopping have been performed. Two experimental setups have been constructed, permitting the investigation of various hydraulic and geometric parameters. Each experimental setup includes a main channel, separated from a floodplain by a dike. A rectangular initial notch is cut in the crest to initiate dike breaching. The breach development is monitored continuously using a specific developed laser profilometry technique. The observations have shown that the breach develops in two stages: first the breach deepens and widens with the breach centerline being gradually shifted toward the downstream side of the main channel. This behavior underlines the influence of the flow momentum component parallel to the dike crest. Second, the dike geometry upstream of the breach stops evolving and the breach widening continues only toward the downstream side of the main channel. The breach evolution has been found strongly affected by the flow conditions (i.e. inflow discharge in the main channel, downstream boundary condition) and floodplain confinement. The findings of this work shed light on key mechanisms of fluvial dike breaching, which differ substantially from those of dam breaching. These specific features need to be incorporated in flood risk analyses involving fluvial dike breach and failure. In addition, a well-documented, reliable data set, with a continuous high resolution monitoring of the 3D breach evolution under various flow conditions, has been gathered, which can be used for validating numerical models.
NASA Astrophysics Data System (ADS)
Nicolae Lerma, Alexandre; Bulteau, Thomas; Elineau, Sylvain; Paris, François; Durand, Paul; Anselme, Brice; Pedreros, Rodrigo
2018-01-01
A modelling chain was implemented in order to propose a realistic appraisal of the risk in coastal areas affected by overflowing as well as overtopping processes. Simulations are performed through a nested downscaling strategy from regional to local scale at high spatial resolution with explicit buildings, urban structures such as sea front walls and hydraulic structures liable to affect the propagation of water in urban areas. Validation of the model performance is based on hard and soft available data analysis and conversion of qualitative to quantitative information to reconstruct the area affected by flooding and the succession of events during two recent storms. Two joint probability approaches (joint exceedance contour and environmental contour) are used to define 100-year offshore conditions scenarios and to investigate the flood response to each scenario in terms of (1) maximum spatial extent of flooded areas, (2) volumes of water propagation inland and (3) water level in flooded areas. Scenarios of sea level rise are also considered in order to evaluate the potential hazard evolution. Our simulations show that for a maximising 100-year hazard scenario, for the municipality as a whole, 38 % of the affected zones are prone to overflow flooding and 62 % to flooding by propagation of overtopping water volume along the seafront. Results also reveal that for the two kinds of statistic scenarios a difference of about 5 % in the forcing conditions (water level, wave height and period) can produce significant differences in terms of flooding like +13.5 % of water volumes propagating inland or +11.3 % of affected surfaces. In some areas, flood response appears to be very sensitive to the chosen scenario with differences of 0.3 to 0.5 m in water level. The developed approach enables one to frame the 100-year hazard and to characterize spatially the robustness or the uncertainty over the results. Considering a 100-year scenario with mean sea level rise (0.6 m), hazard characteristics are dramatically changed with an evolution of the overtopping / overflowing process ratio and an increase of a factor 4.84 in volumes of water propagating inland and 3.47 in flooded surfaces.
Hedgecock, T. Scott
2003-01-01
A two-dimensional finite-element surface-water model was used to study the effects of proposed modifications to the State Highway 203 corridor (proposed Elba Bypass/relocated U.S. Highway 84) on water-surface elevations and flow distributions during flooding in the Pea River and Whitewater Creek Basins at Elba, Coffee County, Alabama. Flooding was first simulated for the March 17, 1990, flood, using the 1990 flood-plain conditions to calibrate the model to match measured data collected by the U.S. Geological Survey and the U.S. Army Corps of Engineers after the flood. After model calibration, the effects of flooding were simulated for four scenarios: (1) floods having the 50- and 100-year recurrence intervals for the existing flood-plain, bridge, highway, and levee conditions; (2) floods having the 50- and 100-year recurrence intervals for the existing flood-plain and levee conditions with the State Highway 203 embankment and bridge removed; (3) floods having the 50- and 100-year recurrence intervals for the existing flood-plain, bridge, and highway conditions with proposed modifications (elevating) to the levee; and (4) floods having the 50- and 100-year recurrence intervals for the proposed conditions reflecting the Elba Bypass and modified levee. The simulation of floodflow for the Pea River and Whitewater Creek flood of March 17, 1990, in the study reach compared closely to flood profile data obtained after the flood. The flood of March 17, 1990, had an estimated peak discharge of 58,000 cubic feet per second at the gage (just below the confluence) and was estimated to be between a 50-year and 100-year flood event. The estimated peak discharge for Pea River and Whitewater Creek was 40,000 and 42,000 cubic feet per second, respectively. Simulation of floodflows for the 50-year flood (51,400 cubic feet per second) at the gage for existing flood-plain, bridge, highway, and levee conditions indicated that about 31 percent of the peak flow was conveyed by the State Highway 203 bridge over Whitewater Creek, approximately 12 percent overtopped the State Highway 203 embankment, and about 57 percent was conveyed by the Pea River flood plain east of State Highway 125. For this simulation, flow from Pea River (2,380 cubic feet per second) overtopped State Highway 125 and crossed over into the Whitewater Creek flood plain north of State Highway 203, creating one common flood plain. The water-surface elevation estimated at the downstream side of the State Highway 203 bridge crossing Whitewater Creek was 202.82 feet. The girders for both the State Highway 203 and U.S. Highway 84 bridges were partially submerged, but U.S. Highway 84 was not overtopped. For the 100-year flood (63,500 cubic feet per second) at the gage, the simulation indicated that about 25 percent of the peak flow was conveyed by the State Highway 203 bridge over Whitewater Creek, approximately 24 percent overtopped the State Highway 203 embankment, and about 51 percent was conveyed by the Pea River flood plain east of State Highway 125. The existing levee adjacent to Whitewater Creek was overtopped by a flow of 3,200 cubic feet per second during the 100-year flood. For this simulation, flow from Pea River (6,710 cubic feet per second) overtopped State Highway 125 and crossed over into the Whitewater Creek flood plain north of State Highway 203. The water-surface elevation estimated at the downstream side of the State Highway 203 bridge crossing Whitewater Creek was 205.60 feet. The girders for both the State Highway 203 and U.S. Highway 84 bridges were partially submerged, and the west end of the U.S. Highway 84 bridge was overtopped. Simulation of floodflows for the 50-year flood at the gage for existing flood-plain and levee conditions, but with the State Highway 203 embankment and bridge removed, yielded a lower water-surface elevation (202.90 feet) upstream of this bridge than that computed for the existing conditions. For the 100-year flood, the simulation indi
Laboratory Observations of Dune Erosion
NASA Astrophysics Data System (ADS)
Maddux, T. B.; Ruggiero, P.; Palmsten, M.; Holman, R.; Cox, D. T.
2006-12-01
Coastal dunes are an important feature along many coastlines, owing to their input to the sediment supply, use as habitat, and ability to protect onshore resources from wave attack. Correct predictions of the erosion and overtopping rates of these features are needed to develop improved responses to coastal dune damage events, and to determining the likelihood and magnitude of future erosion and overtopping on different beaches. We have conducted a large-scale laboratory study at Oregon State University's O.H. Hinsdale Wave Research Laboratory (HWRL) with the goal of producing a comprehensive, near prototype-scale, physical model data set of hydrodynamics, sediment transport, and morphological evolution during extreme dune erosion events. The two goals of this work are (1) to develop a better understanding of swash/dune dynamics and (2) to evaluate and guide further development of dune erosion models. We present initial results from the first phase of the experimental program. An initial beach and dune profile was selected based on field LIDAR-based observations of various U.S. east coast and Gulf coast dune systems. The laboratory beach was brought to equilibrium with pre-storm random wave conditions. It was subsequently subjected to attack from steadily increasing water level and offshore wave heights. Observations made include inner surf zone and swash free surface and velocities as well as wave-by-wave estimates of topographical change at high spatial resolution through the use of stereo video imagery. Future work will include studies of fluid overtopping of the dune and sediment overwash and assessment of the resilience of man-made "push-up" dunes to wave attack in comparison with their more-compacted "natural" cousins.
Design of converging stepped spillways
USDA-ARS?s Scientific Manuscript database
Roller compacted concrete (RCC) stepped spillways are growing in popularity for providing overtopping protection for aging watershed dams with inadequate auxiliary spillway capacity and for the construction of new dams. Unobtainable land rights, topographic features, and land use changes caused by ...
Mowing of northern hardwood reproduction not profitable
Victor S. Jensen; Robert W., Jr. Wilson
1951-01-01
Many northern hardwood stands in the Northeast contain a number of large, worthless trees that were left over from earlier logging jobs. The seedlings and saplings under such stands are usually misshapen by having been overtopped and suppressed for years.
Hydraulic forces on submerged bridge decks.
DOT National Transportation Integrated Search
2008-09-01
Bridge decks can be subjected to large horizontal forces when overtopping occurs. These forces may result in the displacement of bridge decks from the bents. This paper reports on the results of a laboratory study of horizontal forces on bridge decks...
Hydraulic Design of Stepped Spillways Workshop
USDA-ARS?s Scientific Manuscript database
Stepped chutes and spillways are commonly used for routing discharges during flood events. In addition, stepped chutes are used for overtopping protection of earthen embankments. Stepped spillways provide significant energy dissipation due to its stepped feature; as a result, the stilling basin as...
Converging stepped spillways: Simplified momentum analysis approach
USDA-ARS?s Scientific Manuscript database
Roller compacted concrete (RCC) stepped spillways are growing in popularity for providing overtopping protection for aging watershed dams with inadequate auxiliary spillway capacity and for the construction of new dams. Site conditions, such as limited right-of-way, topography, and geological forma...
Development of CCHE2D embankment break model
USDA-ARS?s Scientific Manuscript database
Earthen embankment breach often results in detrimental impact on downstream residents and infrastructure, especially those located in the flooding zone. Embankment failures are most commonly caused by overtopping or internal erosion. This study is to develop a practical numerical model for simulat...
Failure of a massive earthquake-induced landslide dam in Papua New Guinea
King, J. P.; Loveday, I. C.; Schuster, R.L.
1987-01-01
This article discusses the recent occurrence of a large earthquake-induced landslide that dammed the Bairaman River in the interior of hte island of New Britian, Papua New Guinea, and the subsequent overtopping and failure of this landslide dam.
Stepped chute training wall height requirements
USDA-ARS?s Scientific Manuscript database
Stepped chutes are commonly used for overtopping protection for embankment dams. Aerated flow is commonly associated with stepped chutes if the chute has sufficient length. The aeration and turbulence of the flow can create a significant amount of splash over the training wall if not appropriately...
18 CFR 12.35 - Specific inspection requirements.
Code of Federal Regulations, 2013 CFR
2013-04-01
...) Seismicity; (ix) Internal stress and hydrostatic pressures in project structures or their foundations or... structures; (iii) The structural adequacy and stability of structures under all credible loading conditions... project works to withstand the loading or overtopping which may occur from a flood up to the probable...
18 CFR 12.35 - Specific inspection requirements.
Code of Federal Regulations, 2012 CFR
2012-04-01
...) Seismicity; (ix) Internal stress and hydrostatic pressures in project structures or their foundations or... structures; (iii) The structural adequacy and stability of structures under all credible loading conditions... project works to withstand the loading or overtopping which may occur from a flood up to the probable...
Observations on dam cvertopping protection: RCC stepped spillway research
USDA-ARS?s Scientific Manuscript database
Research conducted over the last decade has led to improved understanding on the design and hydraulic performance of stepped spillways applied to embankment dams for overtopping protection. This research has demonstrated that the free-surface air entrainment inception point (Li), step height to cri...
Floods of June 4 and 12, 1976, at Culbertson, Montana
Johnson, M.V.
1978-01-01
Runoff from rainfall caused flooding in the town of Culbertson, Montana, on June 4 and 12, 1976. Flood damage was mostly to business and residential structures within Culberston. Two small drainage contributed the peak flows, which at one site exceeded 1,200 cubic feet per second per square mile of contributing area. Flow from the Missouri River tributary No 5 at Culbertson consisted of flow through a pipe-arch at the State Highway 16 crossing and flow that overtopped the right bank of the main channel. Maximum combined pipe-arch and bypass flow for the June 12 flood was 1,30030 cubic feet per second. Flow from Diamond Creek consisted of flow through a culvert at the U.S. Highway 2 crossing west of Culbertson and flow that overtopped a road. Maximum combined culvert and bypass flow for the June 4 flood was 1,320 cubic feet per second. Failure of small dam increased the flow volume of the flood.
Estimated splash and training wall height requirements for stepped chutes applied to embankment dams
USDA-ARS?s Scientific Manuscript database
Aging embankment dams are commonly plagued with insufficient spillway capacity. To provide increased spillway capacity, stepped chutes are frequently applied as an overtopping protection system for embankment dams. Stepped chutes with sufficient length develops aerated flow. The aeration and flow...
WinDAM C earthen embankment internal erosion analysis software
USDA-ARS?s Scientific Manuscript database
Two primary causes of dam failure are overtopping and internal erosion. For the purpose of evaluating dam safety for existing earthen embankment dams and proposed earthen embankment dams, Windows Dam Analysis Modules C (WinDAM C) software will simulate either internal erosion or erosion resulting f...
DOT National Transportation Integrated Search
2017-02-01
This report provides guidance to public officials and engineers considering the replacement of a deficient or obsolete bridge with a low-water stream crossing (LWSC). An LWSC is a structure that is occasionally overtopped by floodwaters and is likely...
Coupled dam safety analysis using WinDAM
USDA-ARS?s Scientific Manuscript database
Windows® Dam Analysis Modules (WinDAM) is a set of modular software components that can be used to analyze overtopping and internal erosion of embankment dams. Dakota is an extensive software framework for design exploration and simulation. These tools can be coupled to create a powerful framework...
Numerical Modeling of Wave Overtopping of Buffalo Harbor Confined Disposal Facility (CDF4)
2017-10-01
for U.S. Army Corps of Engineers, Buffalo District 1776 Niagara Street, Buffalo, NY 14207 Under Wave Structures Work Unit 280H46 ERDC/CHL TR-17-18...11 2.2 Structure data...33 3.2 Type and condition of structures
Modeling a glacial lake outburst flood process chain: the case of Lake Palcacocha and Huaraz, Peru
NASA Astrophysics Data System (ADS)
Somos-Valenzuela, Marcelo A.; Chisolm, Rachel E.; Rivas, Denny S.; Portocarrero, Cesar; McKinney, Daene C.
2016-07-01
One of the consequences of recent glacier recession in the Cordillera Blanca, Peru, is the risk of glacial lake outburst floods (GLOFs) from lakes that have formed at the base of retreating glaciers. GLOFs are often triggered by avalanches falling into glacial lakes, initiating a chain of processes that may culminate in significant inundation and destruction downstream. This paper presents simulations of all of the processes involved in a potential GLOF originating from Lake Palcacocha, the source of a previously catastrophic GLOF on 13 December 1941, killing about 1800 people in the city of Huaraz, Peru. The chain of processes simulated here includes (1) avalanches above the lake; (2) lake dynamics resulting from the avalanche impact, including wave generation, propagation, and run-up across lakes; (3) terminal moraine overtopping and dynamic moraine erosion simulations to determine the possibility of breaching; (4) flood propagation along downstream valleys; and (5) inundation of populated areas. The results of each process feed into simulations of subsequent processes in the chain, finally resulting in estimates of inundation in the city of Huaraz. The results of the inundation simulations were converted into flood intensity and preliminary hazard maps (based on an intensity-likelihood matrix) that may be useful for city planning and regulation. Three avalanche events with volumes ranging from 0.5 to 3 × 106 m3 were simulated, and two scenarios of 15 and 30 m lake lowering were simulated to assess the potential of mitigating the hazard level in Huaraz. For all three avalanche events, three-dimensional hydrodynamic models show large waves generated in the lake from the impact resulting in overtopping of the damming moraine. Despite very high discharge rates (up to 63.4 × 103 m3 s-1), the erosion from the overtopping wave did not result in failure of the damming moraine when simulated with a hydro-morphodynamic model using excessively conservative soil characteristics that provide very little erosion resistance. With the current lake level, all three avalanche events result in inundation in Huaraz due to wave overtopping, and the resulting preliminary hazard map shows a total affected area of 2.01 km2, most of which is in the high hazard category. Lowering the lake has the potential to reduce the affected area by up to 35 %, resulting in a smaller portion of the inundated area in the high hazard category.
Development of CCHE2D embankment break model
USDA-ARS?s Scientific Manuscript database
Flooding due to breaching of earth embankments often results in detrimental impact on the people and their properties in the flooding zone. The embankment breaching process is often caused by overtopping of excessive water in a reservoir or a river. This study is to develop a practical numerical m...
Restoration release of overtopped Oregon white oak increases 10-year growth and acorn production
Warren D. Devine; Constance A. Harrington
2013-01-01
In the Willamette Valley-Puget Trough-Georgia Basin ecoregion of the North American Pacific Northwest, there has been widespread encroachment of Douglas-fir (Pseudotsuga menziesii) upon Oregon white oak (Quercus garryana) savanna and woodland stands that were historically maintained by frequent anthropogenic fire. Restoration...
DOT National Transportation Integrated Search
2017-02-01
This report provides guidance to public officials and engineers considering the replacement of a deficient or obsolete bridge with a low-water stream crossing (LWSC). An LWSC is a structure that is occasionally overtopped by floodwaters and is likely...
30 CFR 715.18 - Dams constructed of or impounding waste material.
Code of Federal Regulations, 2012 CFR
2012-07-01
... overtopping by wind and wave action. (iii) Dams shall have minimum safety factors as follows: Case Loading... abutments shall be controlled to prevent excessive uplift pressures, internal erosion, sloughing, removal of... before construction begins. (8) All dams shall be removed and the disturbed areas regraded, revegetated...
30 CFR 715.18 - Dams constructed of or impounding waste material.
Code of Federal Regulations, 2014 CFR
2014-07-01
... overtopping by wind and wave action. (iii) Dams shall have minimum safety factors as follows: Case Loading... abutments shall be controlled to prevent excessive uplift pressures, internal erosion, sloughing, removal of... before construction begins. (8) All dams shall be removed and the disturbed areas regraded, revegetated...
30 CFR 715.18 - Dams constructed of or impounding waste material.
Code of Federal Regulations, 2013 CFR
2013-07-01
... overtopping by wind and wave action. (iii) Dams shall have minimum safety factors as follows: Case Loading... abutments shall be controlled to prevent excessive uplift pressures, internal erosion, sloughing, removal of... before construction begins. (8) All dams shall be removed and the disturbed areas regraded, revegetated...
23 CFR 650.117 - Content of design studies.
Code of Federal Regulations, 2013 CFR
2013-04-01
... BRIDGES, STRUCTURES, AND HYDRAULICS Location and Hydraulic Design of Encroachments on Flood Plains § 650... probability of exceedance and, at appropriate locations, the water surface elevations associated with the overtopping flood or the flood of § 650.115(a)(1)(ii), and (2) The magnitude and water surface elevation of...
23 CFR 650.117 - Content of design studies.
Code of Federal Regulations, 2014 CFR
2014-04-01
... BRIDGES, STRUCTURES, AND HYDRAULICS Location and Hydraulic Design of Encroachments on Flood Plains § 650... probability of exceedance and, at appropriate locations, the water surface elevations associated with the overtopping flood or the flood of § 650.115(a)(1)(ii), and (2) The magnitude and water surface elevation of...
23 CFR 650.117 - Content of design studies.
Code of Federal Regulations, 2012 CFR
2012-04-01
... BRIDGES, STRUCTURES, AND HYDRAULICS Location and Hydraulic Design of Encroachments on Flood Plains § 650... probability of exceedance and, at appropriate locations, the water surface elevations associated with the overtopping flood or the flood of § 650.115(a)(1)(ii), and (2) The magnitude and water surface elevation of...
23 CFR 650.117 - Content of design studies.
Code of Federal Regulations, 2011 CFR
2011-04-01
... BRIDGES, STRUCTURES, AND HYDRAULICS Location and Hydraulic Design of Encroachments on Flood Plains § 650... probability of exceedance and, at appropriate locations, the water surface elevations associated with the overtopping flood or the flood of § 650.115(a)(1)(ii), and (2) The magnitude and water surface elevation of...
23 CFR 650.117 - Content of design studies.
Code of Federal Regulations, 2010 CFR
2010-04-01
... BRIDGES, STRUCTURES, AND HYDRAULICS Location and Hydraulic Design of Encroachments on Flood Plains § 650... probability of exceedance and, at appropriate locations, the water surface elevations associated with the overtopping flood or the flood of § 650.115(a)(1)(ii), and (2) The magnitude and water surface elevation of...
Hedgecock, T. Scott
1999-01-01
A two-dimensional finite-element surface-water model was used to study the effects of U.S. Highway 231 and the proposed Montgomery Outer Loop on the water-surface elevations and flow distributions during flooding in the Catoma Creek and Little Catoma Creek Basins southeast of Montgomery, Montgomery County, Alabama. The effects of flooding were simulated for two scenarios--existing and proposed conditions--for the 100- and 500-year recurrence intervals. The first scenario was to model the existing bridge and highway configuration for U.S. Highway 231 and the existing ponds that lie just upstream from this crossing. The second scenario was to model the proposed bridge and highway configuration for the Montgomery Outer Loop and the Montgomery Loop Interchange at U.S. Highway 231 as well as the proposed modifications to the ponds upstream. Simulation of floodflow for Little Catoma Creek for the existing conditions at U.S. Highway 231 indicates that, for the 100-year flood, 54 percent of the flow (8,140 cubic feet per second) was conveyed by the northernmost bridge, 21 percent (3,130 cubic feet per second) by the middle bridge, and 25 percent (3,780 cubic feet per second) by the southernmost bridge. No overtopping of U.S. Highway 231 occurred. However, the levees of the catfish ponds immediately upstream from the crossing were completely overtopped. The average water- surface elevations for the 100-year flood at the upstream limits of the study reach for Catoma Creek and Little Catoma Creek were 216.9 and 218.3 feet, respectively. For the 500-year flood, the simulatin indicates that 51 percent of the flow (11,200 cubic feet per second) was conveyed by the northernmost bridge, 25 percent (5,480 cubic feet per second) by the middle bridge, and 24 percent (5,120 cubic feet per second) by the southernmost bridge. The average water0surface elevations for the 500-year flood at the upstream limits of the study reach for Catoma Creek and Little Catoma Creek were 218.2 and 219.5 feet, respectively. For the 500-year flood, no overtopping of U.S. Highway 231 occurred. Simulation of the 100-year floodflow for Little Catoma Creek for the proposed conditions indicates that, for the existing bridges on U.S. Highway 231, 54 percent of the flow (8,190 cubic feet per second) was conveyed by the northernmost bridge, 22 percent (3,350 cubic feet per second) by the middle bridge, and 24 percent (3,490 cubic feet per second) by the southernmost bridge. The two proposed relief bridges on the Montgomery Outer Loop upstream from the proposed remaining catfish ponds conveyed about 7,750 cubic feet per second (3,400 cubic feet per second for the west relief bridge and 4,350 cubic feet per second for the east relief bridge) with an average depth of flow of about 7 feet. The average water-surface elevation at the upstream limit of the study reach for Little Catoma Creek was 218.8 feet, which is about 0.5 foot higher than the average water-surface elevation for the existing conditions. For the 100-year flood, there was no overtopping of either U.S. Highway 231 or the Montgomery Outer Loop. However, the levees of the proposed remaining catfish ponds were completely overtopped. For the Montgomery Outer Loop crossing of Catoma Creek, simulation of the 100-year floodflow indicates that about 58 percent of the flow (14,100 cubic feet per second) was conveyed by the proposed main channel bridge and 42 percent (10,200 cubic feet per second) by the proposed relief bridge. The average water-surface elevation at the upstream limit of the study reach for Catoma Creek was 216.9 feet, which is the same as the water-surface elevation for the existing conditions. Results of model simulations for the 500-year flood for the proposed conditions indicate that there was no overtopping on either U.S. Highway 231 or the Montgomery Outer Loop. For the existing bridges on U.S. Highway 231, 42 percent of the flow (11,300 cubic feet per second) was conveyed by the northernmost bridge
Development and validation of a 2D dam break process model
USDA-ARS?s Scientific Manuscript database
Flooding due to dam or levee breach often results in detrimental impact on the people and their properties in the flooding zone. The embankment breach process is often caused by overtopping or internal erosion due to excessive water in a reservoir or a river. This study is to develop a practical nu...
30 CFR 717.18 - Dams constructed of or impounding waste material.
Code of Federal Regulations, 2012 CFR
2012-07-01
... at least 3 feet to avoid overtopping by wind and wave action. (iii) Dams shall have minimum safety... pressures, internal erosion, sloughing, removal of material by solution, or erosion of material by loss into... regulatory authority before construction begins. (8) All dams shall be removed and the disturbed areas...
30 CFR 717.18 - Dams constructed of or impounding waste material.
Code of Federal Regulations, 2014 CFR
2014-07-01
... at least 3 feet to avoid overtopping by wind and wave action. (iii) Dams shall have minimum safety... pressures, internal erosion, sloughing, removal of material by solution, or erosion of material by loss into... regulatory authority before construction begins. (8) All dams shall be removed and the disturbed areas...
30 CFR 717.18 - Dams constructed of or impounding waste material.
Code of Federal Regulations, 2013 CFR
2013-07-01
... at least 3 feet to avoid overtopping by wind and wave action. (iii) Dams shall have minimum safety... pressures, internal erosion, sloughing, removal of material by solution, or erosion of material by loss into... regulatory authority before construction begins. (8) All dams shall be removed and the disturbed areas...
John R. Jones; Norbert V. DeByle
1985-01-01
Aspen has been recognized for many years as being very intolerant of shade (Baker 1918a, Clements 1910, Weigle and Frothingham 1911, Zon and Graves 1911). In dense stands, vigorous aspen trees are confined to the dominant and codominant crown classes. Regardless of size, when they are overtopped by larger trees, aspen trees deteriorate and eventually die. Many well-...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-25
... of the dam not designed to be overtopped. After a full consideration of alternatives, this... for the DSA project permitting the Huntington District to begin detailed design and [[Page 70296... concrete blocks placed against the downstream face of the dam, and a pavement for scour protection...
Will Garry oak respond to release from overtopping conifers
Constance A. Harrington; Christel C. Kern
2002-01-01
Garry oak (Quercus garryana) woodlands provide unique habitat for many Pacific Northwest species but these habitats are rapidly disappearing as species composition shifts to conifer or land use changes to urban or agricultural. Many oak trees from former savannas or oak woodlands on Fort Lewis Military Reservation (near Tacoma, WA, USA) are currently...
High-light acclimation in Quercus robur L.seedlings upon over-topped a shaded environment
Anna M. Jensen; Emile S. Gardiner; Kevin C. Vaughn
2012-01-01
High developmental plasticity at the seedling-level during acclimation to the light environment may be an important determinant of seedling establishment and growth in temperate broadleaf forests, especially in dense understories where spatial light availability can vary greatly. Pedunculate oak (Quercus robur L.) seedlings were raised beneath a...
NASA Astrophysics Data System (ADS)
Hassan, Marwan A.; Ismail, Mohd A. M.
2017-10-01
The point of this review is to depict the impact of various inflow discharge rate releases on the instruments of matric suction and volumetric water content during an experimental test of spatial overtopping failure at school of civil engineering in universiti Sains of Malaysia. A dry sand dike was conducted inside small flume channel with twelve sensors of tensiometer and Time-Domain Reflectometer (TDR). Instruments are installed in the soil at different locations in downstream and upstream slopes of the dike for measuring the response of matric suction and volumetric water content, respectively. Two values of inflow discharge rates of 30 and 40 L/min are utilized as a part of these experiments to simulate the effectiveness of water reservoirs in erosion mechanism. The outcomes demonstrate that the matric suction and volumetric water content are decreased and increased, respectively for both inflow discharges. The higher inflow discharges accelerate the saturation of dike soil and the erosion process faster than that for the lower inflow discharges.
Dam break analysis and flood inundation map of Krisak dam for emergency action plan
NASA Astrophysics Data System (ADS)
Juliastuti, Setyandito, Oki
2017-11-01
The Indonesian Regulation which refers to the ICOLD Regulation (International Committee on Large Dam required have the Emergency Action Plan (EAP) guidelines because of the dams have potential failure. In EAP guidelines there is a management of evacuation where the determination of the inundation map based on flood modeling. The purpose of the EAP is to minimize the risk of loss of life and property in downstream which caused by dam failure. This paper will describe about develop flood modeling and inundation map in Krisak dam using numerical methods through dam break analysis (DBA) using hydraulic model Zhong Xing HY-21. The approaches of dam failure simulation are overtopping and piping. Overtopping simulation based on quadrangular, triangular and trapezium fracture. Piping simulation based on cracks of orifice. Using results of DBA, hazard classification of Krisak dam is very high. The nearest village affected dam failure is Singodutan village (distance is 1.45 kilometer from dam) with inundation depth is 1.85 meter. This result can be used by stakeholders such as emergency responders and the community at risk in formulating evacuation procedure.
Negligible effect of competition on coral colony growth.
Álvarez-Noriega, Mariana; Baird, Andrew H; Dornelas, Maria; Madin, Joshua S; Connolly, Sean R
2018-06-01
Competition is an important determinant of assemblage structure and population regulation, often resulting in decreased growth, fecundity or survival. In corals, most studies testing for an effect of competition on demographic traits, such as growth, have been experimental and often impose very high levels of competition upon colonies. To more realistically assess the role of competition on coral traits, multispecies studies in the wild are required. Here, we use 5 yr of data that includes 11 coral species on the reef crest at Lizard Island on the Great Barrier Reef to quantify the effect of competition on growth. Additionally, we test whether species differ in their susceptibility to direct-contact (overgrowth and digestion) and overtopping competition, and whether species from some morphological groups are more likely to compete with one another than with species from other morphological groups. We also investigate the relationships between competitive ability and three key traits: growth rate, mechanical stability and fecundity. In contrast to most previous work using field manipulations of competition, we found a negligible effect of competition on growth. Acropora species consistently won overtopping encounters but lost in direct-contact encounters, and these results were consistent among the four Acropora morphological groups. In contrast, the massive Goniastrea spp. were poor at overtopping but generally won direct-contact encounters. Only tabular colonies were disproportionally more likely to compete against one another than with other morphologies. This propensity increases intraspecific relative to interspecific competition, a phenomenon that can promote coexistence when it is present among dominant competitors. Good competitors grew more quickly and had higher fecundity but were less mechanically stable, implying a tradeoff between performance during disturbance vs. performance in the absence of disturbance. We conclude that competition among adults is less likely to influence community dynamics than previously thought. If competition does have an effect, it is more likely to occur at life-stages other than adults. © 2018 by the Ecological Society of America.
Michael D. Cain
1991-01-01
First-year density and quadrat stocking of naturally established loblolly and shortleaf pine regeneration were monitored forfive consecutive seedyearson disturbed and undisturbed seedbeds. Compared to untreatedchecks,additional gainsin pine seedling density as a result of exposing mineral soil were not as great as initial gains achieved by control of overtopping...
Probability of Flood-Induced Overtopping of Barriers in Watershed-Reservoir-Dam Systems
2011-09-01
developed empirical charts to estimate the historical 6-h, 10 mi2 PMP attributable to a uniform storm on such a point within the basin area (USBR 1976, 1977...ENGINEERING © ASCE / SEPTEMBER 2011 / 11 Queries 1. Please provide 10 mi2 in SI units. 2. The double parentheses in the spillway outflow have been
Herbicide Release of 4 Year Old, Naturally Regenerated Bottomland Oaks -- 10 Year Results
Larry E. Nix
2004-01-01
In 1989 two clearcut, naturally regenerated bottomland hardwood stands near the Congaree River in South Carolina were found to contain nearly 2000 red oak (Quercus pagoda Raf. and Q. shumardii Buckley) seedlings per acre. By age 4, these oak seedlings were quickly being overtopped by competitive sprouts, vines, and fast growing...
Timing of longleaf seedling release from over topping hardwoods: A look 30 years later
William D. Boyer
1985-01-01
Significant differences in longleaf pine (Pinus palustris) growth among early and delayed seedling release treatments were recorded at age 10, but these differences had disappeared upon reexamination at age 31.A study begun in 1949 included six release treatments: complete seedling release from overtopping hardwoods at ages 1, 2, 3, 4, and 8 years,...
Liberation: Acceptable production of tropical forest timber.
Frank H. Wadsworth; Johan Zweede
2006-01-01
Reduced impact logging in an eastern Amazonian terra firme forest left more than half of the next crop trees growing at a rate corresponding to a rotation of more than a century to attain 60-cm dbh. Two years after the logging, in 20 ha of the logged forest, tree competitors around crop trees were eliminated. Competitors were defined as trees whose crowns overtopped...
NASA Astrophysics Data System (ADS)
Sabino, André; Poseiro, Pedro; Rodrigues, Armanda; Reis, Maria Teresa; Fortes, Conceição J.; Reis, Rui; Araújo, João
2018-03-01
The run-up and overtopping by sea waves are two of the main processes that threaten coastal structures, leading to flooding, destruction of both property and the environment, and harm to people. To build early warning systems, the consequences and associated risks in the affected areas must be evaluated. It is also important to understand how these two types of spatial information integrate with sensor data sources and the risk assessment methodology. This paper describes the relationship between consequences and risk maps, their role in risk management and how the HIDRALERTA system integrates both aspects in its risk methodology. It describes a case study for Praia da Vitória Port, Terceira Island, Azores, Portugal, showing that the main innovations in this system are twofold: it represents the overtopping flow and consequent flooding, which are critical for coastal and port areas protected by maritime structures, and it works also as a risk assessment tool, extremely important for long-term planning and decision-making. Moreover, the implementation of the system considers possible known variability issues, enabling changes in its behaviour as needs arise. This system has the potential to become a useful tool for the management of coastal and port areas, due to its capacity to effectively issue warnings and assess risks.
NASA Astrophysics Data System (ADS)
Sabino, André; Poseiro, Pedro; Rodrigues, Armanda; Reis, Maria Teresa; Fortes, Conceição J.; Reis, Rui; Araújo, João
2018-04-01
The run-up and overtopping by sea waves are two of the main processes that threaten coastal structures, leading to flooding, destruction of both property and the environment, and harm to people. To build early warning systems, the consequences and associated risks in the affected areas must be evaluated. It is also important to understand how these two types of spatial information integrate with sensor data sources and the risk assessment methodology. This paper describes the relationship between consequences and risk maps, their role in risk management and how the HIDRALERTA system integrates both aspects in its risk methodology. It describes a case study for Praia da Vitória Port, Terceira Island, Azores, Portugal, showing that the main innovations in this system are twofold: it represents the overtopping flow and consequent flooding, which are critical for coastal and port areas protected by maritime structures, and it works also as a risk assessment tool, extremely important for long-term planning and decision-making. Moreover, the implementation of the system considers possible known variability issues, enabling changes in its behaviour as needs arise. This system has the potential to become a useful tool for the management of coastal and port areas, due to its capacity to effectively issue warnings and assess risks.
Striker, Lora K.; Ivanoff, Michael A.
1997-01-01
Contraction scour for all modelled flows ranged from 0.0 to 0.8 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge, which was less than the 100-year discharge. Abutment scour ranged from 5.6 to 10.0 ft at the left abutment and from 3.1 to 4.2 ft at the right abutment. The worst-case abutment scour occurred at the incipient roadway-overtopping discharge at the left abutment. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Fluvial dike breaching due to overtopping: how different is it from dam breaching?
NASA Astrophysics Data System (ADS)
Rifai, Ismail; Erpicum, Sébastien; Archambeau, Pierre; Violeau, Damien; Pirotton, Michel; El kadi Abderrezzak, Kamal; Dewals, Benjamin
2017-04-01
During floods in large rivers, casualties and extent of damage are often aggravated by breach formation across fluvial dikes. The most frequent cause of breaching is flow overtopping. Predicting the breach geometry and associated outflow hydrograph is of critical importance for estimating the inundation characteristics in the floodplain and the resulting flood risk. Because fluvial dikes are built along a main channel that conveys flowing water, fluvial dike breaching differs from dam breaching, in which the embankment is built across the channel downstream of a reservoir. While a vast body of studies exists on dam breaching configuration (e.g., Schmocker et al. 2012, 2014, Müller et al. 2016), little is known on specific aspects of fluvial dike breaching. We performed laboratory experiments that highlight the specific erosion processes governing fluvial dike breaching (Rifai et al. 2017a). The experimental setup includes a 10 m long and 1 m wide main channel, separated from a floodplain by a 0.3 m high dike of trapezoidal cross-section. The dike material was homogeneous and made of uniform sand. A rectangular initial notch was cut in the crest to initiate 3D breaching. The breach development was monitored continuously using a self-developed laser profilometry technique (Rifai et al. 2016). The observations reveal that the breach develops in two stages. First, a combined breach deepening and widening occur, together with a gradual shift of the breach centreline toward the downstream side of the main channel. Later, the breach widening continues only toward the downstream side of the main channel, highlighting a significant influence of flow momentum in the main channel. Moreover, the breach cross-section is tilted toward the downstream end of the main channel, which is a signature of an asymmetric velocity distribution through the breach (Rifai et al. 2017b). When the inflow discharge in the main channel is increased, the breach development becomes much faster (e.g., seven times faster for a 150 % increase in the inflow discharge). When an equilibrium state is reached at the end of the test, the breach centreline orientation is found consistent with the theory of flow over a lateral weir. In the experiments, the boundary condition at the downstream end of the main channel is a lumped representation of river characteristics downstream of the breach section. In real-world conditions, these river characteristics influence the flow partition between the breach and the main channel. Therefore, we tested several downstream boundary conditions (perforated plane, rectilinear weir and sluice gate). For the same inflow discharge and water levels, they lead to significantly different breach geometries. The findings of this research shed light on key mechanisms occurring in fluvial dike breaching, which differ substantially from those in dam breaching. These specific features need to be incorporated in flood risk analyses involving fluvial dike breaching. This research also delivers a unique experimental database of high resolution continuous monitoring of the breach geometry under various flow conditions. The datasets are freely available for engineers and researchers willing to assess the performance of numerical models to simulate dike breaching and resulting flood. References Müller, C., Frank, P.-J., Hager, W.H. (2016). Dyke overtopping: effects of shape and headwater elevation. Journal of Hydraulic Research, 54(4), 410-422. Rifai, I., Erpicum, S., Archambeau, P., Violeau, D., Pirotton, M., El kadi Abderrezzak, K., Dewals, B. (2016). Monitoring topography of laboratory fluvial dike models subjected to breaching based on a laser profilometry technique. Proc. International Symposium on River Sedimentation (ISRS), 19-22 September 2016, Stuttgart. Rifai, I., Erpicum, S., Archambeau, P., Violeau, D., Pirotton, M., El kadi Abderrezzak, K., Dewals, B. (2017a). Overtopping induced failure of non-cohesive, homogenous fluvial dikes. Water Resources Research, under revision. Rifai, I., Erpicum, S., Archambeau, P., Violeau, D., Pirotton, M., El kadi Abderrezzak, K., Dewals, B. (2017b). Discussion of: Laboratory Study on 3D Flow Structures Induced by Zero-Height Side Weir and Implications for 1D Modeling. Journal of Hydraulic Engineering, 07016010. doi: 10.1061/(ASCE)HY.1943-7900.0001256 Schmocker, L., Frank, P.-J., Hager, W.H. (2014). Overtopping dike-breach: Effect of grain size distribution. Journal of Hydraulic Research, 52(4), 559-564. Schmocker, L., Hager, W.H. (2012). Plane dike-breach due to overtopping: Effects of sediment, dike height and discharge. Journal of Hydraulic Research, 50(6), 576-586.
Travis DeLuca; Mary Ann Fajvan; Gary Miller
2009-01-01
Ten-years after diameter-limit harvesting in an Appalachian hardwood stand, the height, dbh, and basal area of sapling regeneration was inversely related to the degree of "overtopping" of residual trees. Black cherry and red maple were the most abundant saplings with 416.5 ± 25.7 and 152.9 ± 16.8 stems per acre, respectively. Models of black...
17. Photographic copy of photograph (at the offices of Finch, ...
17. Photographic copy of photograph (at the offices of Finch, Pruyn & Company, Glen Street, Glens Falls, New York), Beach?, Photographer, March 28, 1913. Panoramic view of the Hudson River at Glens Falls during the March 1913 flood showing overtopped Glens Falls Dam and washed out bridge. Facing southwest. - Glens Falls Dam, 100' to 450' West of U.S. Route 9 Bridge Spanning Hudson River, Glens Falls, Warren County, NY
Early release improves long-term growth and development of direct-seeded nuttall oak saplings
James S. Meadows; Robert L. Johnson; Roger M. Krinard
2015-01-01
Early growth of bottomland oaks is typically slow, and many oaks eventually become overtopped by trees of other species. Removal of these larger competitors in a young stand might improve growth of the oaks and lead to more free-to-grow oaks as the stand matures. Release treatments were applied in 1980 to an 11-year-old, direct-seeded Nuttall oak (Quercus texana Buckl...
NASA Astrophysics Data System (ADS)
Orszaghova, Jana; Borthwick, Alistair G. L.; Taylor, Paul H.
2012-01-01
This article describes a one-dimensional numerical model of a shallow-water flume with an in-built piston paddle moving boundary wavemaker. The model is based on a set of enhanced Boussinesq equations and the nonlinear shallow water equations. Wave breaking is described approximately, by locally switching to the nonlinear shallow water equations when a critical wave steepness is reached. The moving shoreline is calculated as part of the solution. The piston paddle wavemaker operates on a movable grid, which is Lagrangian on the paddle face and Eulerian away from the paddle. The governing equations are, however, evolved on a fixed mapped grid, and the newly calculated solution is transformed back onto the moving grid via a domain mapping technique. Validation test results are compared against analytical solutions, confirming correct discretisation of the governing equations, wave generation via the numerical paddle, and movement of the wet/dry front. Simulations are presented that reproduce laboratory experiments of wave runup on a plane beach and wave overtopping of a laboratory seawall, involving solitary waves and compact wave groups. In practice, the numerical model is suitable for simulating the propagation of weakly dispersive waves and can additionally model any associated inundation, overtopping or inland flooding within the same simulation.
Hydrologic effects of hypothetical earthquake-caused floods below Jackson Lake, northwestern Wyoming
Glass, W.R.; Keefer, T.N.; Rankl, J.G.
1976-01-01
Jackson Lake, located in Grand Teton National Park, Wyoming, is in an area of seismic instability. There is a possibility of flooding in the Snake River downstream from Jackson Lake Dam in the event of a severe earthquake. Hypothetical floods were routed 38 miles (61 kilometers) downstream from the dam for three cases: (1) Instantaneous destruction of the dam outlet structure, (2) instantaneous destruction of the entire dam, and (3) for waves overtopping the dam without failure of the dam. In each case, a full reservoir was assumed. Hydrographs for outflow from the reservoir for the two cases of dam failure were developed utilizing an accelerated discharge due to the travel of a negative wave through the reservoir, and Muskingum storage routing. For the case of waves overtopping the dam, a 10-foot (3-meter) wave was assumed to be propagated from the upstream end of the reservori. A multiple-linearization technique was used to route the flow through the reach. The model was calibrated from U.S. Geological Survey streamflow records. Most extensive flooding and largest water velocities would occur if the entire dam were destroyed; floods for the other two cases were smaller. An inundation map was prepared from channel conveyance curves and profiles of the water surface. (Woodard-USGS)
Burns, Ronda L.; Medalie, Laura
1997-01-01
Contraction scour for the modelled flows ranged from 1.0 to 2.7 ft. The worst-case contraction scour occurred at the incipient-overtopping discharge. Abutment scour ranged from 8.4 to 17.6 ft. The worst-case abutment scour for the right abutment occurred at the incipient-overtopping discharge. For the left abutment, the worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Burns, Ronda L.; Weber, Matthew A.
1997-01-01
Contraction scour for all modelled flows ranged from 0.6 to 1.5 ft. The worst-case contraction scour occurred at the incipient-overtopping discharge which was less than the 100-year discharge. Abutment scour ranged from 3.5 to 8.9 ft. The worst-case abutment scour occurred at the incipient road-overtopping discharge for the left abutment and at the 100-year discharge for the right abutment. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A crosssection of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Flooding Risk for Coastal Infrastructure: a Stakeholder-Oriented Approach
NASA Astrophysics Data System (ADS)
Plater, A. J.; Prime, T.; Brown, J. M.; Knight, P. J.; Morrissey, K.
2015-12-01
A flood risk assessment for coastal energy infrastructure in the UK with respect to long-term sea-level rise and extreme water levels has been conducted using a combination of numerical modelling approaches (LISFLOOD-FP, SWAB, XBeach-G, POLCOMS). Model outputs have been incorporated into a decision-support tool that enables users from a wide spectrum of coastal stakeholders (e.g. nuclear energy, utility providers, local government, environmental regulators, communities) to explore the potential impacts of flooding on both operational (events to 10 years) and strategic (10 to 50 years) timescales. Examples illustrate the physical and economic impacts of flooding from combined extreme water levels, wave overtopping and high river flow for Fleetwood, NW England; changes in the extent of likely flooding arising from an extreme event due to sea-level rise for Oldbury, SW England; and the relative vulnerability to overtopping and breaching of sea defences for Dungeness, SE England. The impacts of a potential large-scale beach recharge scheme to mitigate coastal erosion and flood risk along the southern shoreline of Dungeness are also examined using a combination of coastal evolution and particle-tracking modelling. The research goal is to provide an evidence base for resource allocation, investment in interventions, and communication and dialogue in relation to sea-level rise to 2500 AD.
Boehmler, Erick M.; Ivanoff, Michael A.
1997-01-01
Contraction scour for all modelled flows ranged from 0.0 to 0.9 feet. The worst-case contraction scour occurred at the incipient-overtopping discharge, which was less than the 100-year discharge. Abutment scour ranged from 6.1 to 18.4 feet. The worst-case abutment scour occurred at the 500-year discharge for the right abutment and the incipient overtopping discharge for the left abutment. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A crosssection of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
The Perfect Storm: Changing National Policies to Reduce Flooding Impacts and Costs
2011-12-01
nothing less than work reflecting the highest intellectual and creative efforts. They gave freely of their personal and weekend time to assist me in...this approach encouraged living in unsafe areas. Kahan, Wu, Hajiamiri, and Knopman (2006, p. 7) argue with regards to structural flood control...building levees, make residents feel safe when, in fact, they are still targets for catastrophes should the levee be breached or overtopped.” 22 In
The Quantification and Evolution of Resilience in Integrated Coastal Systems
2012-08-01
for natural protection when protective beaches and sand dunes are destroyed or overtopped. Protects a beach or sand dune that fronts backshore from...dredged material on a beach, dune , barrier island, or sand berm located in the near- shore zone. Stabilize the location of an eroding beach, dune ...waves will erode beaches and dunes . Table 5. Components and processes that are part of an ecosystem restoration subsystem defined by an oyster
James B. Baker; Michael G. Shelton
1998-01-01
Development of 86 intermediate and suppressed loblolly pine (Pinus taeda L.) trees, that had been recently released from overtopping pines and hardwoods, was monitored over a 15 year period. The trees were growing in natural stands on good sites (site index = 90 ft at 50 years) that had been recently cut to stocking levels ranging from 10 to 50 percent. At time of...
Modeling a Glacial Lake Outburst Flood Process Chain: The Case of Lake Palcacocha and Huaraz, Peru
NASA Astrophysics Data System (ADS)
Chisolm, Rachel; Somos-Valenzuela, Marcelo; Rivas Gomez, Denny; McKinney, Daene C.; Portocarrero Rodriguez, Cesar
2016-04-01
One of the consequences of recent glacier recession in the Cordillera Blanca, Peru, is the risk of Glacial Lake Outburst Floods (GLOFs) from lakes that have formed at the base of retreating glaciers. GLOFs are often triggered by avalanches falling into glacial lakes, initiating a chain of processes that may culminate in significant inundation and destruction downstream. This paper presents simulations of all of the processes involved in a potential GLOF originating from Lake Palcacocha, the source of a previously catastrophic GLOF on December 13, 1941, 1800 people in the city of Huaraz, Peru. The chain of processes simulated here includes: (1) avalanches above the lake; (2) lake dynamics resulting from the avalanche impact, including wave generation, propagation, and run-up across lakes; (3) terminal moraine overtopping and dynamic moraine erosion simulations to determine the possibility of breaching; (4) flood propagation along downstream valleys; and (5) inundation of populated areas. The results of each process feed into simulations of subsequent processes in the chain, finally resulting in estimates of inundation in the city of Huaraz. The results of the inundation simulations were converted into flood intensity and hazard maps (based on an intensity-likelihood matrix) that may be useful for city planning and regulation. Three avalanche events with volumes ranging from 0.5-3 x 106 m3 were simulated, and two scenarios of 15 m and 30 m lake lowering were simulated to assess the potential of mitigating the hazard level in Huaraz. For all three avalanche events, three-dimensional hydrodynamic models show large waves generated in the lake from the impact resulting in overtopping of the damming-moraine. Despite very high discharge rates (up to 63.4 x 103 m3/s), the erosion from the overtopping wave did not result in failure of the damming-moraine when simulated with a hydro-morphodynamic model using excessively conservative soil characteristics that provide very little erosion resistance. With the current lake level, all three avalanche events result in inundation in Huaraz, and the resulting hazard map shows a total affected area of 2.01 km2, most of which is in the high-hazard category. Lowering the lake has the potential to reduce the affected area by up to 35% resulting in a smaller portion of the inundated area in the high-hazard category.
1991-12-10
necessary to plan the location and manner of overtopping. Freeboard is to be designed and the final results supported and documented. Site specific...elevation resulting from incorporating values that represent reasonably high conveyance losses that could occur given the uncertainty of the best estimates...in the relationships. The result of the risk analysis framework approach is a matrix of levee height, probability distributions of the several
Controls on the breach geometry and flood hydrograph during overtopping of non-cohesive earthen dams
Walder, Joseph S.; Iverson, Richard M.; Godt, Jonathan W.; Logan, Matthew; Solovitz, Stephen A.
2015-01-01
Overtopping failure of non-cohesive earthen dams was investigated in 13 large-scale experiments with dams built of compacted, damp, fine-grained sand. Breaching was initiated by cutting a notch across the dam crest and allowing water escaping from a finite upstream reservoir to form its own channel. The channel developed a stepped profile, and upstream migration of the steps, which coalesced into a headcut, led to the establishment of hydraulic control (critical flow) at the channel head, or breach crest, an arcuate erosional feature that functions hydraulically as a weir. Novel photogrammetric methods, along with underwater videography, revealed that the retreating headcut maintained a slope near the angle of friction of the sand, while the cross section at the breach crest maintained a geometrically similar shape through time. That cross-sectional shape was nearly unaffected by slope failures, contrary to the assumption in many models of dam breaching. Flood hydrographs were quite reproducible--for sets of dams ranging in height from 0.55 m to 0.98 m--when the time datum was chosen as the time that the migrating headcut intersected the breach crest. Peak discharge increased almost linearly as a function of initial dam height. Early-time variability between flood hydrographs for nominally identical dams is probably a reflection of subtle experiment-to-experiment differences in groundwater hydrology and the interaction between surface water and groundwater.
Boehmler, Erick M.; Weber, Matthew A.
1997-01-01
Contraction scour for all modelled flows ranged from 0.0 to 0.3 ft. The worst-case contraction scour occurred at the incipient overtopping discharge, which was less than the 100-year discharge. Abutment scour ranged from 6.2 to 9.4 ft. The worst-case abutment scour for the right abutment was 9.4 feet at the 100-year discharge. The worst-case abutment scour for the left abutment was 8.6 feet at the incipient overtopping discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Burns, Ronda L.; Degnan, James R.
1997-01-01
Contraction scour for all modelled flows ranged from 2.6 to 4.6 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge. The left abutment scour ranged from 11.6 to 12.1 ft. The worst-case left abutment scour occurred at the incipient road-overtopping discharge. The right abutment scour ranged from 13.6 to 17.9 ft. The worst-case right abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in Tables 1 and 2. A cross-section of the scour computed at the bridge is presented in Figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 46). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Burns, R.L.; Severance, Timothy
1997-01-01
Contraction scour for all modelled flows ranged from 0.0 to 1.3 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge, which was less than the 100-year discharge. The right abutment scour ranged from 6.1 to 7.2 ft. The worstcase right abutment scour occurred at the incipient roadway-overtopping discharge. The left abutment scour ranged from 7.1 to 10.3 ft. The worst-case left abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented he
Flood hydrology and dam-breach hydraulic analyses of five reservoirs in Colorado
Stevens, Michael R.; Hoogestraat, Galen K.
2013-01-01
The U.S. Department of Agriculture Forest Service has identified hazard concerns for areas downstream from five Colorado dams on Forest Service land. In 2009, the U.S. Geological Survey, in cooperation with the Forest Service, initiated a flood hydrology analysis to estimate the areal extent of potential downstream flood inundation and hazard to downstream life, property, and infrastructure if dam breach occurs. Readily available information was used for dam-breach assessments of five small Colorado reservoirs (Balman Reservoir, Crystal Lake, Manitou Park Lake, McGinnis Lake, and Million Reservoir) that are impounded by an earthen dam, and no new data were collected for hydraulic modeling. For each reservoir, two dam-breach scenarios were modeled: (1) the dam is overtopped but does not fail (break), and (2) the dam is overtopped and dam-break occurs. The dam-breach scenarios were modeled in response to the 100-year recurrence, 500-year recurrence, and the probable maximum precipitation, 24-hour duration rainstorms to predict downstream flooding. For each dam-breach and storm scenario, a flood inundation map was constructed to estimate the extent of flooding in areas of concern downstream from each dam. Simulation results of the dam-break scenarios were used to determine the hazard classification of the dam structure (high, significant, or low), which is primarily based on the potential for loss of life and property damage resulting from the predicted downstream flooding.
NASA Astrophysics Data System (ADS)
Bornas, M. A.
2001-12-01
Rapid rise of Mount Pinatubo's crater lake and recent geological assessments of the crater's lowest point, the Maraunot Notch, raised concern about a breakout lahar down the northwestern slope of the volcano. Three factors indicated a serious hazard. First, the lake rose about 50 m from May 98-August 2001 and was expected to overtop the Maraunot Notch within the last trimester 2001. Overtopping might well have occurred at the height of a strong typhoon or under heavy monsoonal rainstorms. Second, the uppermost 10-20 m of "dam" was erodible ash and poorly indurated coarse breccia, susceptible to failure by overtopping and erosion as at many landslide and other natural dams. Third, the volumes of lake discharge corresponding to 10 and 20 m of erosion would have been 28 and 55 million m3; peak discharges at a breach could have been as high as 3,200 m3/sec to 11,000 m3/sec, respectively. These discharges would have eroded 1991 pyroclastic and lahar material on the volcano's slopes, increased the flow volume by 3-6x, and entered the Bucao River as a large-magnitude lahar. The Municipality of Botolan (pop. ca. 40,000) lies on the delta of the Bucao River valley some 40 km downriver from the notch, and could have been at great risk. Given this potential risk, the Philippine Institute of Volcanology and Seismology (PHIVOLCS) in early August 2001 advocated three actions. (1) An intentional breaching of the Maraunot Notch by the construction of a spillway or canal, by the Department of Public Works and Highways (DPWH). Early breaching would limit further rise of the lake and thus reduce the magnitude of potential flood. Also, breaching would be scheduled during good weather to eliminate the danger of overtopping at an unknown time and/or under typhoon/rainstorm conditions. (2) An information campaign in Botolan in order to educate and prepare residents for breaching. (3) Evacuation of people at risk, one day before the scheduled breaching. A spillway was excavated by as many as 70 men with picks and shovels, and the specter of a wholly uncontrolled breach through the most erodible debris was averted. Early flow through the spillway was gentle and evacuees quickly returned home. However, 10-15 m of poorly indurated breccia still remains, lake level is still rising slowly, and we are watching to see whether outflow after heavy rains will armor the spillway or catastrophically erode the remaining dam. Insufficient communication between scientists and engineers led DPWH to design for less scouring than expected by PHIVOLCS, and politics and liability concerns at several levels halted digging before the trench could be deepened and outflow increased. Perhaps this is just as well. An inherent conflict arose between short- and long-term risk mitigation. Short-term risk was minimized; long-term risk was reduced but remains a concern. Complete breaching of the dam and thus elimination of long-term risk would have sharply increased short-term risk to Botolan. *Quick Response Team Members: Mabel Abigania, Rene Arante, Onie Arboleda, Maricar Arpa, Mariton Bornas, Edwin dela Cruz, Jojo Cordon, Toti Corpuz, Art Daag, Elmer Gabinete, Del Garcia, Lito Gelido, Lito de Guzman, Sheila Insauriga, Dindo Javier, Rudy Lacson, Bong Luis, Rey Lumbang, Danny Martinez, Mylene Martinez-Villegas, Chris Newhall, Jed Paladio-Melosantos, Mel Pagtalunan, Myla Panol, Jack Puertollano, Raymundo Punongbayan, Gina Quiambao, Andoy Ramos, July Sabit, Noli Sexon, Jimmy Sincioco, Opet Villacorte.
2013-09-25
level will not overtop the main embankment dam but will encroach into the 3.6-feet of freeboard allotted for wind and wave run-up. This encroachment...In particular, short-term impacts on noise, air quality, water quality, migratory birds , fisheries, and traffic during construction have not been...term effects of project construction, specifically the short-term, temporary impacts on noise, air quality, water quality, migratory birds , fisheries
1980-11-01
STATEMENT (of the abstract antarod in Block 20, It different frm Report) III. SUPPLEMENTARY NOTES Copies are obtainable from National Technical...should employ a professional engineer experienced in operation and maintanance of darns to develop written operating procedures and a periodic...100 YEAR FLOOD WOULD CAUSE A DAM TO bE OVERTOPPED THEREFORE THE OWNER SHOULD ENGAGE A QUALIFIED PkOFEbSIONAL CONSULTANT USING MORE PERCISE METHODS
2013-01-22
eK ay a nd M cC le lla nd G ra ha m Katrina HEC -FIA LifeSim Figure 1: Comparison of loss of life models (based on Johnstone et al., 2005...Katrina HEC FIA Lifesim Application: flood types Levee breaching, river , coastal Levee breaching, river , coastal levee breaching, dam failure...Mortality – Overtopping with breach Center Side of American River (OTSC) Figure 31: Mortality for the HEC -FIA method for the two
1981-07-01
Safety Program Erosion Embankmients Watchung Lake Dam, N.J. Visual InspectionSeae IStructural Analysis Spillways 12M~ A0ST Acr (cathiue samvwgip @ta N...determined by a qualified professional consultant engaged by the owner using more sophisticated methods , procedures and studies within six months...be overtopped. (The SDF, in this instance, is one half of the Probable Maximum Flood). The decision to consider the spillway " inaae - quate" instead of
1988-03-01
distribution Zb DECLASSIFICATION/OOWNGRADING SCHEDULE unlimited. 4 PERFORMING ORGANIZATION REPORT NUMBER(S) S MONITORING ORGANIZATION REPORT NUMBER(S...Technical Report CERC-88-1. 6a NAME OF PERFORMING ORGANIZATION 6b OFFICE SYMBOL 7a. NAME OF MONITORING ORGANIZATION USAEWES, Coastal Engineering (if...FUNDING/SPONSORING 8b OFFICE SYMBOL 9 PROCUREMENT INSTRUMENT IDENTIFICATION NUMBER ORGANIZATION US Army (If applicable) Engineer District, Norfolk Intra
Quantitative and Qualitative Geospatial Analysis of a Probable Catastrophic Dam Failure
NASA Astrophysics Data System (ADS)
Oduor, P. G.; Stenehjem, J.
2011-12-01
Geospatial techniques were used in assessing inundation extents that would occur in the event of a catastrophic failure of Fort Peck dam. Fort Peck dam, located in Montana, USA has a spillway design which under dam failure the crest is expected to reach Williston a major economic hub in North Dakota in 1.4 days with a peak elevation of 1891 ft (576.377 m) msl (mean sea level). In this study, we address flooding extents and impacts on establishments with respect to a peak elevation of 1891 ft. From this study, we can unequivocally state that the City of Williston will be significantly impacted if Fort Peck dam fails with almost all critical needs, for example, gasoline stations, emergency facilities and grocery stores completely inundated. A secondary catastrophic event may be tied to the primary economic activity in Williston, that is, oil rigs of which most lie on the pathway of an inadvertent flood crest. We also applied a Discrete Fourier Transformation (DFT), and Lomb-Scargle normalized periodogram analyses and fitting of Fort Peck dam reservoir level fluctuations to gauge (a) likelihood of the dam overtopping, and (b) anatomic life span. Whereas we found that inasmuch as the dam could be considered stable by directly analyzing other dams that have failed, there is still a lower likelihood of it to fail at a 99-232 years range from construction. There was lack of concomitancy between overtopping and dam failure rates.
Prime, Thomas; Brown, Jennifer M.; Plater, Andrew J.
2015-01-01
Conventionally flood mapping typically includes only a static water level (e.g. peak of a storm tide) in coastal flood inundation events. Additional factors become increasingly important when increased water-level thresholds are met during the combination of a storm tide and increased mean sea level. This research incorporates factors such as wave overtopping and river flow in a range of flood inundation scenarios of future sea-level projections for a UK case study of Fleetwood, northwest England. With increasing mean sea level it is shown that wave overtopping and river forcing have an important bearing on the cost of coastal flood events. The method presented converts inundation maps into monetary cost. This research demonstrates that under scenarios of joint extreme surge-wave-river events the cost of flooding can be increased by up to a factor of 8 compared with an increase in extent of up to a factor of 3 relative to “surge alone” event. This is due to different areas being exposed to different flood hazards and areas with common hazard where flood waters combine non-linearly. This shows that relying simply on flood extent and volume can under-predict the actual economic impact felt by a coastal community. Additionally, the scenario inundation depths have been presented as “brick course” maps, which represent a new way of interpreting flood maps. This is primarily aimed at stakeholders to increase levels of engagement within the coastal community. PMID:25710497
Prime, Thomas; Brown, Jennifer M; Plater, Andrew J
2015-01-01
Conventionally flood mapping typically includes only a static water level (e.g. peak of a storm tide) in coastal flood inundation events. Additional factors become increasingly important when increased water-level thresholds are met during the combination of a storm tide and increased mean sea level. This research incorporates factors such as wave overtopping and river flow in a range of flood inundation scenarios of future sea-level projections for a UK case study of Fleetwood, northwest England. With increasing mean sea level it is shown that wave overtopping and river forcing have an important bearing on the cost of coastal flood events. The method presented converts inundation maps into monetary cost. This research demonstrates that under scenarios of joint extreme surge-wave-river events the cost of flooding can be increased by up to a factor of 8 compared with an increase in extent of up to a factor of 3 relative to "surge alone" event. This is due to different areas being exposed to different flood hazards and areas with common hazard where flood waters combine non-linearly. This shows that relying simply on flood extent and volume can under-predict the actual economic impact felt by a coastal community. Additionally, the scenario inundation depths have been presented as "brick course" maps, which represent a new way of interpreting flood maps. This is primarily aimed at stakeholders to increase levels of engagement within the coastal community.
1981-04-01
PA 17324 F. Purpose: Irrigation G. Design and Construction History The dam was designed by the owner with assistance from the local Soil ...assistance of the local office of the Soil Conservation Service. Drawings were not prepared for the facilities. It is unknown what the original design...a sandy soil and could be easily eroded if overtopping would occur. A small subsidence area was noticed near the downstream toe over the 12-inch
1980-03-01
recommended guidelines, the Spillway Design Flood (SDF) ranges between the 1 /2-PMF (Probable Maximum Flood) and PMF. Since the dam is near the lower end of...overtopping. A breach analysis indicates that failure under 1 /2-PMF conditions would probably not lead to increased property damage or loss of life at...ii OVERVIEW PHOTOGRAPH ......... .................. V TABLE OF CONTENTS ......... ................... vi SECTION 1 - GENERAL INFORMATION
Approximate Upper Limit of Irregular Wave Runup on Riprap.
1988-05-01
MAR 8" P editon ’ayb e used utlI exhausteo SC.A’ (ASS,4CA’ON 01_’- S PA(E_ All other ed,t,os are obsolete Unclassified ;I . % ", .. , r .,., . ,C_...Manager, CERC, and Mr. C. E . Chatham, Jr., Chief, Wave Dynamics Division, CERC. COL Dwayne G. Lee, CE, was Commander and Director of WES during the 0...prevent exceedance by runup or to estimate the potential severity of wave overtopping. e PART II: SOURCES OF DATA, TEST SETUPS, AND A. TEST CONDITIONS 3
1980-04-01
generally fair condition because of the seepage through the left spillway training wall and because the low level outlet has not been operated in many...that a dam of this class which does not have sufficient spillway capacity to discharge fifty percent of the PKF , should be adjudged as having a...2,070 cfs or about 14 percent of the test flood outflow without overtopping the dam. The dam is judged to be in generally fair condition because of the
1981-09-14
runoff. 5.5 FLOODS OF RECORD No records of past flooding in Sherruck Brook are available. 5.6 OVERTOPPING POTENTIAL Our analysis indicates that the...constructed in 1970 and the 30 inch CIMP drain was replaced with the 18 inch steel drain in 1980. e. Seismic Stability The structure is located in Zone...Commerce, Technical Paper No, 40, Rainfall Frequency Atlas of the United States, May 1961, 2) U.S. Department of Commerce, Hydrometeorological Report
Wave Overtopping of a Barrier Beach
2009-09-01
but can result in increased dune erosion along Scenic Road as occurred in 1993, 1997, and 2005 (James, 2005). Field data and observations for...factors are equal to 1. The equations for these run-up formulas are parameterized on significant wave height at the toe of the structure as measured in...3 exp C r SS RQ C D HgH γ ⎛ ⎞ = −⎜ ⎟ ⎝ ⎠ 2pξ > where the significant wave height at the toe of the structure, SH and pT are used. Again the
Rentch, J.S.; Ford, W. Mark; Schuler, T.S.; Palmer, J.; Diggins, Corinne A.
2016-01-01
Red spruce (Picea rubens) and red spruce-northern hardwood mixed stands once covered as much as 300,000 ha in the Central Appalachians, but now comprise no more than 21,000 ha. Recently, interest in restoration of this forest type has increased because red spruce forests provide habitat for a number of rare animal species. Our study reports the results of an understory red spruce release experiment in hardwood-dominated stands that have a small component of understory red spruce. In 2005, 188 target spruce were identified in sample plots at six locations in central West Virginia. We projected a vertical cylinder above the crown of all target spruces, and in 2007, we performed a release treatment whereby overtopping hardwoods were treated with herbicide using a stem injection technique. Release treatments removed 0–10% (Control), 11–50% (Low), 51–89% (Medium), and ≤90% (High) of the basal area of overtopping trees. We also took canopy photographs at the time of each remeasurement in 2007, 2010, and 2013, and compared basal removal treatments and resulting 2010 canopy openness and understory light values. The high treatment level provided significantly greater six-year dbh and height growth than the other treatment levels. Based on these results, we propose that a tree-centered release approach utilizing small canopy gaps that emulate the historical, gap-phase disturbance regime provides a good strategy for red spruce restoration in hardwood forests where overstory spruce are virtually absent, and where red spruce is largely relegated to the understory.
Outbursts and Gradualism: Megaflood erosion consistent with long-term landscape evolution
NASA Astrophysics Data System (ADS)
Garcia-Castellanos, Daniel; O'Connor, Jim
2017-04-01
Existing models for the development of topography and relief over geological timescales are fundamentally based on semi-empirical laws of the erosion and sediment transport performed by rivers. The prediction power of these laws is hindered by limitations in measuring river incision and by the scant knowledge of the past hydrological conditions, specifically average water flow and its variability. Consequently, models adopt 'gradualistic' (time-averaged) assumptions and the erodability values derived from modelling long-term erosion rates in rivers remain ambiguously tied not only to the lithology and nature of the bedrock but also to uncertainties in the quantification of past climate. This prevents the use of those erodabilities to predict the landscape evolution in different scenarios. Here, we apply the fundamentals of river erosion models to outburst floods triggered by overtopping lakes, for which the hydrograph is intrinsically known from the geomorphological record or from direct measures. We obtain the outlet erodability from the peak water discharge and lake area observed in 86 floods that span over 16 orders of magnitude in water volume. The obtained erodability-lithology correlation is consistent with that seen in 22 previous long-term river incision quantifications, showing that outburst floods can be used to estimate erodability values that remain valid for a wide range of hydrological regimes and for erosion timescales spanning from hours-long outburst floods to million-year-scale landscape evolution. The results constrain the conditions leading to the runaway erosion responsible for outburst floods triggered by overtopping lakes. They also call for the explicit incorporation of climate episodicity to the landscape evolution models. [Funded by CGL2014-59516].
1980-02-01
discharge coefficient of C = 3.4 was used. 0 Orifice flow condition when the reservoir water surface sub- merges the inlet opening. * Broad crested weir flow...2.7 was used. The intake tower will operate as a weir , as a weir and an orifice, or as an orifice and a broad crested weir depending upon the...spillway C prior to overtopping the railroad embankment into the original dam pond. Flow over this low point was calculated as flow over a broad crested weir
1981-04-01
presently utilized as a fishing camp. b. Location. -The dam is located approximately 2 miles northwest of the Village of Colley, Wilmot Township...1.3 Pertinent Data. a. Drainage Area. 3.13 square miles b. Discharge at Dam Site ( cfs ). Maximum flood at dam site Unknown Drainline capacity at normal...Overtopping Analysis. Complete summary sheets for the computer output are presented in Appendix D. Peak inflow (PMF) 11580 cfs Spillway capacity (recessed
1979-07-01
General 5-1 b. Design Data 5-1 c. Experience Data 5-1 d. Visual Observation 5-1 e. Overtopping Potential 5-1 f. Dam Failure Analysis 5-2 6. STRUCTURAL...the Soil Conservation Service, Durham, New Hampshire. The construction * contractor was Robie Construction Company , Inc. i. Normal Operating...INVENTORY OF DAMS P 0O - ... - SECTION 5 HYDROLOGY AND HYDRAULIC ANALYSIS • 5.1 Evaluation of Features a. General. Baker Dam Site 11 is an earthen
NASA Astrophysics Data System (ADS)
Kafle, Jeevan; Kattel, Parameshwari; Mergili, Martin; Fischer, Jan-Thomas; Tuladhar, Bhadra Man; Pudasaini, Shiva P.
2017-04-01
Dense geophysical mass flows such as landslides, debris flows and debris avalanches may generate super tsunami waves as they impact water bodies such as the sea, hydraulic reservoirs or mountain lakes. Here, we apply a comprehensive and general two-phase, physical-mathematical mass flow model (Pudasaini, 2012) that consists of non-linear and hyperbolic-parabolic partial differential equations for mass and momentum balances, and present novel, high-resolution simulation results for two-phase flows, as a mixture of solid grains and viscous fluid, impacting fluid reservoirs with obstacles. The simulations demonstrate that due to the presence of different obstacles in the water body, the intense flow-obstacle-interaction dramatically reduces the flow momentum resulting in the rapid energy dissipation around the obstacles. With the increase of obstacle height overtopping decreases but, the deflection and capturing (holding) of solid mass increases. In addition, the submarine solid mass is captured by the multiple obstacles and the moving mass decreases both in amount and speed as each obstacle causes the flow to deflect into two streams and also captures a portion of it. This results in distinct tsunami and submarine flow dynamics with multiple surface water and submarine debris waves. This novel approach can be implemented in open source GIS modelling framework r.avaflow, and be applied in hazard mitigation, prevention and relevant engineering or environmental tasks. This might be in particular for process chains, such as debris impacts in lakes and subsequent overtopping. So, as the complex flow-obstacle-interactions strongly and simultaneously dissipate huge energy at impact such installations potentially avoid great threat against the integrity of the dam. References: Pudasaini, S. P. (2012): A general two-phase debris flow model. J. Geophys. Res. 117, F03010, doi: 10.1029/ 2011JF002186.
NASA Astrophysics Data System (ADS)
Herrero-Huertaa, Mónica; Lindenbergh, Roderik; Ponsioen, Luc; van Damme, Myron
2016-06-01
Emergence of light detection and ranging (LiDAR) technology provides new tools for geomorphologic studies improving spatial and temporal resolution of data sampling hydrogeological instability phenomena. Specifically, terrestrial laser scanning (TLS) collects high resolution 3D point clouds allowing more accurate monitoring of erosion rates and processes, and thus, quantify the geomorphologic change on vertical landforms like dike landside slopes. Even so, TLS captures observations rapidly and automatically but unselectively. In this research, we demonstrate the potential of TLS for morphological change detection, profile creation and time series analysis in an emergency simulation for characterizing and monitoring slope movements in a dike. The experiment was performed near Schellebelle (Belgium) in November 2015, using a Leica Scan Station C10. Wave overtopping and overflow over a dike were simulated whereby the loading conditions were incrementally increased and 14 successful scans were performed. The aim of the present study is to analyse short-term morphological dynamic processes and the spatial distribution of erosion and deposition areas along a dike landside slope. As a result, we are able to quantify the eroded material coming from the impact on the terrain induced by wave overtopping which caused the dike failure in a few minutes in normal storm scenarios (Q = 25 l/s/m) as 1.24 m3. As this shows that the amount of erosion is measurable using close range techniques; the amount and rate of erosion could be monitored to predict dike collapse in emergency situation. The results confirm the feasibility of the proposed methodology, providing scalability to a comprehensive analysis over a large extension of a dike (tens of meters).
Flood damage claims reveal insights about surface runoff in Switzerland
NASA Astrophysics Data System (ADS)
Bernet, D. B.; Prasuhn, V.; Weingartner, R.
2015-12-01
A few case studies in Switzerland exemplify that not only overtopping water bodies frequently cause damages to buildings. Reportedly, a large share of the total loss due to flooding in Switzerland goes back to surface runoff that is formed and is propagating outside of regular watercourses. Nevertheless, little is known about when, where and why such surface runoff occurs. The described process encompasses surface runoff formation, followed by unchannelised overland flow until a water body is reached. It is understood as a type of flash flood, has short response times and occurs diffusely in the landscape. Thus, the process is difficult to observe and study directly. A promising source indicating surface runoff indirectly are houseowners' damage claims recorded by Swiss Public Insurance Companies for Buildings (PICB). In most of Switzerland, PICB hold a monopoly position and insure (almost) every building. Consequently, PICB generally register all damages to buildings caused by an insured natural hazard (including surface runoff) within the respective zones. We have gathered gapless flood related claim records of most of all Swiss PICB covering more than the last two decades on average. Based on a subset, we have developed a methodology to differentiate claims related to surface runoff from other causes. This allows us to assess the number of claims as well as total loss related to surface runoff and compare these to the numbers of overtopping watercourses. Furthermore, with the good data coverage, we are able to analyze surface runoff related claims in space and time, from which we can infer spatial and temporal characteristics of surface runoff. Although the delivered data of PICB are heterogeneous and, consequently, time-consuming to harmonize, our first results show that exploiting these damage claim records is feasible and worthwhile to learn more about surface runoff in Switzerland.
Automatic Monitoring System Design and Failure Probability Analysis for River Dikes on Steep Channel
NASA Astrophysics Data System (ADS)
Chang, Yin-Lung; Lin, Yi-Jun; Tung, Yeou-Koung
2017-04-01
The purposes of this study includes: (1) design an automatic monitoring system for river dike; and (2) develop a framework which enables the determination of dike failure probabilities for various failure modes during a rainstorm. The historical dike failure data collected in this study indicate that most dikes in Taiwan collapsed under the 20-years return period discharge, which means the probability of dike failure is much higher than that of overtopping. We installed the dike monitoring system on the Chiu-She Dike which located on the middle stream of Dajia River, Taiwan. The system includes: (1) vertical distributed pore water pressure sensors in front of and behind the dike; (2) Time Domain Reflectometry (TDR) to measure the displacement of dike; (3) wireless floating device to measure the scouring depth at the toe of dike; and (4) water level gauge. The monitoring system recorded the variation of pore pressure inside the Chiu-She Dike and the scouring depth during Typhoon Megi. The recorded data showed that the highest groundwater level insides the dike occurred 15 hours after the peak discharge. We developed a framework which accounts for the uncertainties from return period discharge, Manning's n, scouring depth, soil cohesion, and friction angle and enables the determination of dike failure probabilities for various failure modes such as overtopping, surface erosion, mass failure, toe sliding and overturning. The framework was applied to Chiu-She, Feng-Chou, and Ke-Chuang Dikes on Dajia River. The results indicate that the toe sliding or overturning has the highest probability than other failure modes. Furthermore, the overall failure probability (integrate different failure modes) reaches 50% under 10-years return period flood which agrees with the historical failure data for the study reaches.
Analysis of the hydrological safety of dams combining two numerical tools: Iber and DualSPHysics
NASA Astrophysics Data System (ADS)
González-Cao, J.; García-Feal, O.; Domínguez, J. M.; Crespo, A. J. C.; Gómez-Gesteira, M.
2018-02-01
The upgrade of the hydrological safety of dams is a critical issue to avoid failures that can dramatically affect people and assets. This paper shows a numerical methodology to analyse the safety of the Belesar dam (NW, Spain) based on two different numerical codes. First, a mesh-based code named Iber, suited to deal with large 2-D domains, is used to simulate the impoundment. The initial conditions and the inlet provided to Iber correspond to the maximum water elevation and the maximum expected inflow to the impoundment defined in the technical specifications of the dam, which are associated to the more hazardous operation conditions of the dam. Iber provides information about the time needed for water to attain the crest of the dam when floodgates are closed. In addition, it also provides the velocity of discharge when gates are opened. Then, a mesh-free code named DualSPHysics, which is especially suited to deal with complex and violent 3-D flows, is used to reproduce the behaviour of one of the spillways of the dam starting from the results obtained with Iber, which are used as inlet conditions for DualSPHysics. The combined results of both model show that the left spillway can discharge the surplus of water associated to the maximum inflow to the reservoir if the gates of the spillways are opened before the overtopping of the dam was observed. In addition, water depth measured on the spillway is considerably lower than the lateral walls, preventing overtopping. Finally, velocities at different points of the spillway showed to be in good agreement with theoretical values.
Dam failure analysis for the Lago de Matrullas Dam, Orocovis, Puerto Rico
Torres-Sierra, Heriberto; Gómez-Fragoso, Julieta
2015-01-01
Results from the simulated dam failure of the Lago de Matrullas Dam using the HEC–RAS model for the 6- and 24-hour PMP events showed peak discharges at the dam of 3,149.33 and 3,604.70 m3/s, respectively. Dam failure during the 100-year-recurrence, 24-hour rainfall event resulted in a peak discharge of 2,103.12 m3/s directly downstream from the dam. Dam failure under sunny day conditions produced a peak discharge of 1,695.91 m3/s at the dam assuming the antecedent lake level was at the morning-glory spillway invert elevation. Flood-inundation maps prepared as part of the study depict the flood extent and provide valuable information for preparing an Emergency Action Plan. Results of the failure analysis indicate that a failure of the Lago de Matrullas Dam could cause flooding to many of the inhabited areas along stream banks from the Lago de Matrullas Dam to the mouth of the Río Grande de Manatí. Among the areas most affected are the low-lying regions in the vicinity of the towns of Ciales, Manatí, and Barceloneta. The delineation of the flood boundaries near the town of Barceloneta considered the effects of a levee constructed during 2000 at Barceloneta in the flood plain of the Río Grande de Manatí to provide protection against flooding to the near-by low-lying populated areas. The results showed overtopping can be expected in the aforementioned levee during 6- and 24-hour probable-maximum-precipitation dam failure scenarios. No overtopping of the levee was simulated, however, during dam failure scenarios under the 100-year recurrence, 24-hour rainfall event or sunny day conditions.
Barrier Island Failure During Hurricane Katrina
NASA Astrophysics Data System (ADS)
Sallenger, A.; Howd, P.; Stockdon, H.; Wright, C. W.; Fauver, L.; Guy, K.
2006-12-01
Classical models of barrier-island response to storms predict that wave runup can periodically overtop an island and transport sand from its seaside to its bayside, forcing the island to migrate landward. While this process can destroy fixed human developments, the island survives with little net change in form or dimensions. In contrast, we find that Louisiana's Chandeleur Islands during Hurricane Katrina were not periodically overtopped by waves, but were continuously inundated by storm surge. When such inundation occurs locally on a barrier island, it can force the erosion of a narrow breach that connects sea and bay. However, little is known about the response of a barrier island when it is entirely submerged. Here, we show that the Chandeleur Islands approached complete failure, losing 84% of their surface area. Their Gulf of Mexico shorelines retreated landward an average of 268 m, the largest retreat ever reported for a storm. Sand was stripped from the islands, reducing their peak elevation from >6 m to <3 m and exposing them to further degradation and potential failure by future hurricanes of less intensity than Katrina. Further, the islands that survived Katrina were marsh remnants composed of mud and vegetation that relatively small waves diminished following the storm. The Chandeleur Islands are prone to failure because of their location on the Mississippi delta where small sand supply and large sea-level rise (induced locally by land subsidence) limit natural rebuilding of the islands following a storm. The response of the delta's barrier islands during Hurricane Katrina provides a warning of how the world's barrier islands might respond to storm-surge inundation should predictions of accelerated global sea level rise prove accurate.
Soong, David T.; Murphy, Elizabeth A.; Straub, Timothy D.; Zeeb, Hannah L.
2016-11-22
Results of a flood-hazard analysis conducted by the U.S. Geological Survey, in cooperation with the Argonne National Laboratory, for four headwater streams within the Argonne National Laboratory property indicate that the 1-percent and 0.2-percent annual exceedance probability floods would cause multiple roads to be overtopped. Results indicate that most of the effects on the infrastructure would be from flooding of Freund Brook. Flooding on the Northeast and Southeast Drainage Ways would be limited to overtopping of one road crossing for each of those streams. The Northwest Drainage Way would be the least affected with flooding expected to occur in open grass or forested areas.The Argonne Site Sustainability Plan outlined the development of hydrologic and hydraulic models and the creation of flood-plain maps of the existing site conditions as a first step in addressing resiliency to possible climate change impacts as required by Executive Order 13653 “Preparing the United States for the Impacts of Climate Change.” The Hydrological Simulation Program-FORTRAN is the hydrologic model used in the study, and the Hydrologic Engineering Center‒River Analysis System (HEC–RAS) is the hydraulic model. The model results were verified by comparing simulated water-surface elevations to observed water-surface elevations measured at a network of five crest-stage gages on the four study streams. The comparison between crest-stage gage and simulated elevations resulted in an average absolute difference of 0.06 feet and a maximum difference of 0.19 feet.In addition to the flood-hazard model development and mapping, a qualitative stream assessment was conducted to evaluate stream channel and substrate conditions in the study reaches. This information can be used to evaluate erosion potential.
NASA Astrophysics Data System (ADS)
Petroff, C. M.
2011-12-01
Before the March 11, 2011 Tohoku tsunami, many communities along the Japan coast had shore protection barriers, some designed specifically to provide protection from tsunamis and others for typhoon and storm surge protection. A vast number of these structures were overtopped, damaged or destroyed by the high inundation and currents generated in the tsunami. Observations are presented about scour features at man-made coastal structures in the Tohoku region as well as the hydraulic transport of debris from these structures. Along with providing lessons for structure design and maintenance, these observations have implications for hydraulic transport in natural terrain, not only at hard points such as rock outcrops but also at other features such as river mouths, barrier islands and coastal dunes. As an example, Photo 1 shows the overtopping flow at the seawall at Noda, in the Iwate prefecture. From the point of view of hydraulics the type of flow seen in the photo is more like that at an in-line weir or spillway than the wave conditions for which the structure was designed. On the lee or downstream side of such structures, the flow is supercritical resulting in a supercritical to subcritical transition near the landward toe of the seawall. High flow velocities along with increased pore pressure and overturning flow create very deep scour in these locations Such as the zone clearly seen in Photo 2 behind the seawall at the Sendai airport. It is anticipated that similar hydraulic conditions would occur for flow over a high coastal dune ridge where the ridge would act as a flow control point and locally high velocities on the landward side of the ridge would result in high erosion and scour. Other examples are given.
Boehmler, Erick M.; Degnan, James R.
1997-01-01
year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 1.2 to 1.8 feet. The worst-case contraction scour occurred at the incipient overtopping discharge, which is less than the 500-year discharge. Abutment scour ranged from 17.7 to 23.7 feet. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
1981-08-18
HYDRAULICS/HYDROLOGY 5.1 Drainage Area Characteristics 5-1 5.2 Design Data 5-1 5.3 Analysis Criteria 5-1 5.4 Reservoir Capacity 5-2 5.5 Experience...Data 5-2 5.6 Overtopping Potential 5-2 5.7 Analysis of Downstream Impacts 5-2 5.8 Evaluation 5-2 SECTION 6 STRUCTURAL STABILITY 6.1 Visual Observations...elevation is 1587.0 ft. (MSL). 5.3 Analysis Criteria The analysis of the spillway capacity of the dam and the storage of the reservoir was performed using
Simulation of wetlands forest vegetation dynamics
Phipps, R.L.
1979-01-01
A computer program, SWAMP, was designed to simulate the effects of flood frequency and depth to water table on southern wetlands forest vegetation dynamics. By incorporating these hydrologic characteristics into the model, forest vegetation and vegetation dynamics can be simulated. The model, based on data from the White River National Wildlife Refuge near De Witt, Arkansas, "grows" individual trees on a 20 x 20-m plot taking into account effects on the tree growth of flooding, depth to water table, shade tolerance, overtopping and crowding, and probability of death and reproduction. A potential application of the model is illustrated with simulations of tree fruit production following flood-control implementation and lumbering. ?? 1979.
Coleman, Neil M; Kaktins, Uldis; Wojno, Stephanie
2016-06-01
In 1891 a report was published by an ASCE committee to investigate the cause of the Johnstown flood of 1889. They concluded that changes made to the dam by the South Fork Fishing and Hunting Club did not cause the disaster because the embankment would have been overflowed and breached if the changes were not made. We dispute that conclusion based on hydraulic analyses of the dam as originally built, estimates of the time of concentration and time to peak for the South Fork drainage basin, and reported conditions at the dam and in the watershed. We present a LiDAR-based volume of Lake Conemaugh at the time of dam failure (1.455 × 10(7) m(3)) and hydrographs of flood discharge and lake stage decline. Our analytical approach incorporates the complex shape of this dam breach. More than 65 min would have been needed to drain most of the lake, not the 45 min cited by most sources. Peak flood discharges were likely in the range 7200 to 8970 m(3) s(-1). The original dam design, with a crest ∼0.9 m higher and the added capacity of an auxiliary spillway and five discharge pipes, had a discharge capacity at overtopping more than twice that of the reconstructed dam. A properly rebuilt dam would not have overtopped and would likely have survived the runoff event, thereby saving thousands of lives. We believe the ASCE report represented state-of-the-art for 1891. However, the report contains discrepancies and lapses in key observations, and relied on excessive reservoir inflow estimates. The confidence they expressed that dam failure was inevitable was inconsistent with information available to the committee. Hydrodynamic erosion was a likely culprit in the 1862 dam failure that seriously damaged the embankment. The Club's substandard repair of this earlier breach sowed the seeds of its eventual destruction.
National assessment of hurricane-induced coastal erosion hazards: Mid-Atlantic Coast
Doran, Kara S.; Stockdon, Hilary F.; Sopkin, Kristin L.; Thompson, David M.; Plant, Nathaniel G.
2013-01-01
Beaches serve as a natural buffer between the ocean and inland communities, ecosystems, and natural resources. However, these dynamic environments move and change in response to winds, waves, and currents. During extreme storms, changes to beaches can be large, and the results are sometimes catastrophic. Lives may be lost, communities destroyed, and millions of dollars spent on rebuilding. During storms, large waves may erode beaches, and high storm surge shifts the erosive force of the waves higher on the beach. In some cases, the combined effects of waves and surge may cause overwash (when waves and surge overtop the dune, transporting sand inland) or flooding. Building and infrastructure on or near a dune can be undermined during wave attack and subsequent erosion. During Hurricane Ivan in 2004, a five-story condominium in Orange Beach, Alabama, collapsed after the sand dune supporting the foundation eroded. Hurricane Sandy, which made landfall as an extra-tropical cyclone on October 29, 2012, caused erosion and undermining that destroyed roads, boardwalks, and foundations in Seaside Heights, New Jersey. Waves overtopping a dune can transport sand inland, covering roads and blocking evacuation routes or emergency relief. If storm surge inundates barrier island dunes, currents flowing across the island can create a breach, or a new inlet, completely severing evacuation routes. Waves and surge during Hurricane Sandy, which made landfall on October 29, 2012, left a breach that cut the road and bridge to Mantoloking, N.J. Extreme coastal changes caused by hurricanes may increase the vulnerability of communities both during a storm and to future storms. For example, when sand dunes on a barrier island are eroded substantially, inland structures are exposed to storm surge and waves. Absent or low dunes also allow water to flow inland across the island, potentially increasing storm surge in the back bay, on the soundside of the barrier, and on the mainland.
Three occurred debris flows in North-Eastern Italian Alps: documentation and modeling
NASA Astrophysics Data System (ADS)
Boreggio, Mauro; Gregoretti, Carlo; Degetto, Massimo; Bernard, Martino
2015-04-01
Three occurred events of debris flows are documented and modeled by back-analysis. The three debris flows events are those occurred at Rio Lazer on the 4th of November 1966, at Fiames on the 5th of July 2006 and at Rovina di Cancia on the 18th of July 2009. All the three sites are located in the North-Eastern Italian Alps. In all the events, runoff entrained sediments present on natural channels and formed a solid-liquid wave that routed downstream. The first event concerns the routing of debris flow on an inhabited fan. Map of deposition pattern of sediments are built by using post-events photos through stereoscopy techniques. The second event concerns the routing of debris flow along the main channel descending from Pomagagnon Fork. Due to the obstruction of the cross-section debris flow deviated from the original path on the left side and routed downstream by cutting a new channel on the fan. It dispersed in multiple paths when met the wooden area. Map of erosion and deposition depths are built after using a combination of Lidar and GPS data. The third event concerns the routing of debris flow in the Rovina di Cancia channel that filled the reservoir built at the end of the channel and locally overtopped the retaining wall on the left side. A wave of mud and debris inundated the area downstream the overtopping point. Map of erosion and deposition depths are obtained by subtracting two GPS surveys, pre and post event. All the three occurred debris flows are simulated by modeling runoff that entrained debris flow for determining the solid-liquid hydrograph downstream the triggering areas. The routing of the solid-liquid hydrograph was simulated by a bi-phase cell model based on the kinematic approach. The comparison between simulated and measured erosion and deposition depths is satisfactory. The same parameters for computing erosion and deposition were used for the three occurred events.
NASA Astrophysics Data System (ADS)
Singh, Krishan P.; Snorrason, Arni
1984-02-01
Important breach parameters were identified and their ranges were estimated from a detailed study of historical earthdam failures due to overtopping. The U.S. Army Corps of Engineers Hydrologic Engineering Center (HEC) and the National Weather Service (NWS) dam breach models were chosen for evaluation and simulation. Both models use similar input data and breach descriptions, but the HEC uses the hydrologic routing method (modified Puls method), whereas the NWS uses the St. Vénant equations for routing. Information on eight dams in Illinois was taken from the Corps of Engineers inspection reports, and surveyed cross-sections of the downstream channels were supplied by the Division of Water Resources of the Illinois Department of Transportation. Various combinations of breach parameters (failure time, TF; depth of overtopping, hf; and breach size, B) were used for breach simulations by both methods with the 1.00PMF, 0.50PMF and 0.25PMF (probable maximum flood) inflow hydrographs. In general, the flood stage profiles predicted by the NWS were smoother and more reasonable than those predicted by the HEC. For channels with relatively steep slopes, the methods compared fairly well, whereas for the channels with mild slope, the HEC model often predicted oscillating, erratic flood stages, mainly due to its inability to route flood waves satisfactorily in non-prismatic channels. The breach outflow peaks are affected significantly by B but less so by hf. The ratio of outflow peak to inflow peak and the effect of TF on outflow decrease as the drainage area above the dam and impounded storage increase. Flood stage profiles predicted with cross-sections taken from 7.5' maps compared favorably with those predicted using surveyed cross-sections. For the range of breach parameters studied, the range of outflow peaks and flood stages downstream from the dam can be determined for regulatory and disaster prevention measures.
1980-02-14
cifs is only 3 percent of the Probable kaximum Flood (P11F) which was coi’puted to be 13,670 cfs.’ The 1 /2 PI4F is 7,046 cfs. Therefore, the darn...calnnot pass the 1 /2 P,4F without being overtopped. The downstreami hazard is a 1 ijhtly traveled road thAt travels northe] {o the cantonment area. -g ;:p...c t of t e si l a si ad.u t o l1 1 . The discharg caact oftesiia sindqa fraf1ows in excess of 3 per cent of the Nl (siiaAaaiy=40cs.~~ e spillway is
Ancient Martian valley genesis and paleoclimatic inference: The present as a key to the past
NASA Technical Reports Server (NTRS)
Brakenridge, G. R.
1993-01-01
I offer here the speculative genetic hypothesis that the flat-floored landforms represent episodically active, sediment-laden valley glaciers formed by localized geothermal melting of abundant interstitial ice (permafrost) in a fine-grained sedimentary terrain. Geothermal melting may also localize spring heads for the narrow deep, high-gradient valleys, or the collapse process itself may result in the generation of decanted, relatively sediment-poor overland water flows (some local evidence of fluid overtopping of the localized depressions exists). Whatever the generic mechanisms for the suite of valley landforms, perhaps the most interesting observation is simply their youth. In aggregate, the morphologies are similar to the ancient valley systems cited as evidence for a previously much denser atmosphere on Mars.
1956-12-01
34- 25 I I I POOL I I \\ 1 I v Alt VrTS I 0 f TAILWJ.J v GATE COf!TACTS NAPPE I z Q 20 >- ~ w _J 15 w / c_ r- 1-1-- [/> NlPPE OVERTOPS GATE...Q. 40 • 0 ... 0 35 Q. J 0:: 30 w ~ 0 ...J ... 25 0 z 0 20 I\\ POOL [5 "A;t VrTS jTAILWJJ t= ~ w ...J 15 r== == / GATE CONTACT...vGATE CONTACT,S NAPPE 30 w ~ 0 ..1 "- 25 0 z 0 20 ;::: ~ w ..1 15 w 10 ~ [> A’l VrTS 1\\ ~~ !iTAILWAt) 1\\ 0 z "- 1-=:1=:- 1\\ < w ..1
3D SPH numerical simulation of the wave generated by the Vajont rockslide
NASA Astrophysics Data System (ADS)
Vacondio, R.; Mignosa, P.; Pagani, S.
2013-09-01
A 3D numerical modeling of the wave generated by the Vajont slide, one of the most destructive ever occurred, is presented in this paper. A meshless Lagrangian Smoothed Particle Hydrodynamics (SPH) technique was adopted to simulate the highly fragmented violent flow generated by the falling slide in the artificial reservoir. The speed-up achievable via General Purpose Graphic Processing Units (GP-GPU) allowed to adopt the adequate resolution to describe the phenomenon. The comparison with the data available in literature showed that the results of the numerical simulation reproduce satisfactorily the maximum run-up, also the water surface elevation in the residual lake after the event. Moreover, the 3D velocity field of the flow during the event and the discharge hydrograph which overtopped the dam, were obtained.
Hurricane Ike: Field Investigation Survey (Invited)
NASA Astrophysics Data System (ADS)
Ewing, L.
2009-12-01
Hurricane Ike made landfall at 2:10 a.m. on September 13, 2008, as a Category 2 hurricane. The eye of the hurricane crossed over the eastern end of Galveston Island and a large region of the Texas and Louisiana coast experienced extreme winds, waves and water levels, resulting in large impacts from overtopping, overwash, wind and wave forces and flooding. Major damage stretched from Freeport to the southwest and to Port Arthur to the northeast. The effects of the hurricane force winds were felt well inland in Texas and Louisiana and the storm continued to the interior of the US, causing more damage and loss of life. Through the support of the Coasts, Oceans, Ports and Rivers Institute (COPRI) of the American Society of Civil Engineers (ASCE) a team of 14 coastal scientists and engineers inspected the upper Texas coast in early October 2008. The COPRI team surveyed Hurricane Ike’s effects on coastal landforms, structures, marinas, shore protection systems, and other infrastructure. Damages ranges from very minor to complete destruction, depending upon location and elevation. Bolivar Peninsula, to the right of the hurricane path, experienced severe damage and three peninsula communities were completely destroyed. Significant flood and wave damage also was observed in Galveston Island and Brazoria County that were both on the left side of the hurricane path. Beach erosion and prominent overwash fans were observed throughout much of the field investigation area. The post-storm damage survey served to confirm expected performance under extreme conditions, as well as to evaluate recent development trends and conditions unique to each storm. Hurricane Ike confirmed many previously reported observations. One of the main conclusions from the inspection of buildings was that elevation was a key determinant for survival. Elevation is also a major factor in the stability and effectiveness of shore protection. The Galveston Seawall was high enough to provide protection from much of the storm surge, although there was some overtopping and debris was washed over Seawall Boulevard. In contrast, the geotextile tubes that were in used on Bolivar Peninsula and west Galveston were too low to provide an effective barrier to extreme storm surge or to prevent overtopping. Scour and wave erosion were noticeable for all structures, removing sand from the jetties at Rollover Pass, eroding backfill from the west end of the Galveston Seawall and dislocating toe stone and causing rotation of some geotextile tubes. Material for this presentation draw upon the forthcoming ASCE Report, A Report of Field Observations made 3 - 6 October 2008 and “Field investigation of Hurricane Ike impacts to the upper Texas coast” (Ewing et al. 2009) References ASCE Hurricane Ike Field Investigation Team (in production) A Report of Field Observations made 3 - 6 October 2008; sponsored by Coasts, Oceans, Ports and Rivers Institute and Geotechnical Institute of American Society of Civil Engineers. Ewing, Lesley., Donald K. Stauble, Paul A. Work, Billy L. Edge, Spencer M. Rogers, Mandy U. Loeffler, James M. Kaihatu, Margery Overton, Jeffery P. Waters, Kojiro Suzuki, Robert G. Dean, Marie H. Garrett, Eddie Wiggins, and Garry H. Gregory (2009) “Field Investigation of Hurricane Ike Impacts to the Upper Texas Coast” Shore & Beach, vol. 77(2) 9 - 23.
Himalayan Lake- and River-Impacting Landslides and Ice Avalanches: Some So Deadly, Some No Problem
NASA Astrophysics Data System (ADS)
Kargel, J. S.; Karki, A.; Haritashya, U. K.; Shugar, D. H.; Harrison, S.
2017-12-01
Scientific attention to landslides and ice avalanches in Nepal was heightened by the 2015 Gorkha earthquake. However, landslides and ice avalanches— some deadly— are frequent in this mountainous, glacierized country and across High Mountain Asia. River blocking landslides (RBLs) often create dangerous situations due to upstream impoundments and downstream landslide dammed outburst floods (LDOFs). Factors affecting RBL hazards include: Volumes and masses of ice, rock, and water; shape factors of the valley and landslide; grain size-frequency distribution; river hydrograph; and seasonal and weather factors. These factors affect processes such as slumping and erosion of the RBL by overflow or piping, buoyant lifting of dam material, melting of a landslide ice core, liquefaction, overfill overtopping or tsunami overtopping by subsequent landslides into the impoundment, and the volume and peak discharge of an LDOF. Not all processes aggravate hazards; a high ice:rock ratio, for example, can result in immediate tunneling by the river with no subsequent impoundment. A dam composed of mainly boulders with few fines likewise can prevent effective damming; however, a wide spectrum of the particle-size-distribution can make a long-lasting, benign dam. The most hazardous RBLs include those creating large dams and rapidly-filled impoundments, but which can rapidly and catastrophically break up, especially at sites of repeated terrain collapses. The particle size-frequency of a landslide dam depends substantially on bedrock lithology and structure. Vulnerabilities and warning times also affect whether an upstream impoundment flood or LDOF will exert a large toll. For landslide susceptibility assessments, usual treatments involving mountain slopes, valley shape, and seismic activity should be complemented by quantitative measures of bedrock lithology and weathering state, the potential energy and distribution of unstable masses, and recorded historic or prehistoric RBLs in the same area. Factors for landslide triggering of glacial lake outburst floods (GLOFs) include some of the same factors, but the mass/energy input rate into the lake, the lake's shape and length, and moraine dam properties are also important in GLOF triggering. Himalayan examples will illustrate some hazard factors.
NASA Astrophysics Data System (ADS)
Emmer, A.; Vilímek, V.
2014-09-01
This paper presents a new and easily repeatable method for assessing the susceptibility of glacial lakes to outburst floods (GLOFs) within the Peruvian region of the Cordillera Blanca. The presented method was designed to: (a) be repeatable (from the point of view of the demands on input data), (b) be reproducible (to provide an instructive guide for different assessors), (c) provide multiple results for different GLOF scenarios and (d) be regionally focused on the lakes of the Cordillera Blanca. Based on the input data gained from remotely sensed images and digital terrain models/topographical maps, the susceptibility of glacial lakes to outburst floods is assessed using a combination of decision trees for clarity and numerical calculation for repeatability and reproducibility. A total of seventeen assessed characteristics are used, of which seven have not been used in this context before. Also, several ratios and calculations are defined for the first time. We assume that it is not relevant to represent the overall susceptibility of a particular lake to outburst floods by one result (number), thus it is described in the presented method by five separate results (representing five different GLOF scenarios). These are potentials for (a) dam overtopping resulting from a fast slope movement into the lake, (b) dam overtopping following the flood wave originating in a lake situated upstream, (c) dam failure resulting from a fast slope movement into the lake, (d) dam failure following the flood wave originating in a lake situated upstream and (e) dam failure following a strong earthquake. All of these potentials include two or three components and theoretically range from 0 to 1. The presented method was verified on the basis of assessing the pre-flood conditions of seven lakes which have produced ten glacial lake outburst floods in the past and ten lakes which have not. A comparison of these results showed that the presented method successfully identified lakes susceptible to outburst floods (pre-flood conditions of lakes which have already produced GLOFs).
Goerlitz, D.F.; Troutman, D.E.; Godsy, E.M.; Franks, B.J.
1985-01-01
Operation of a wood-preserving facility for nearly 80 years at Pensacola, FL, contaminated the near-surface groundwater with creosote and pentachlorophenol. The major source of aquifer contamination was unlined surface impoundments that were in direct hydraulic contact with the groundwater. Episodes of overtopping the impoundments and overland flow of treatment liquor and waste were also significant to the migration and contamination of the groundwater. Solutes contaminating the ground-water are mainly naphthalene and substituted phenols. Sorption did not influence retardation of solutes in transport in the groundwater. Phenol and the mono substituted methylphenols appear to be undergoing bio-transformation. Pentachlorophenol (PCP) was not found in significant concentrations in the groundwater possibly because the solubility of PCP is approximately 5 mg/L at pH 6, near the average acidity for the groundwater.
Coastal-change impacts during hurricane katrina: an overview
Sallenger, Asbury; Wright, C. Wayne; Lillycrop, Jeff
2007-01-01
As part of an ongoing cooperative effort between USGS, NASA and USACE, the barrier islands within the right-front quadrant of Hurricane Katrina were surveyed with airborne lidar both before and after landfall. Dauphin Island, AL was located the farthest from landfall and wave runup intermittently overtopped its central and western sections. The Gulf-side of the island experienced severe erosion, leaving the first row of houses in the sea, while the bayside accreted. In contrast, the Chandeleur Islands, LA did not experience, this classic `rollover'. Rather, the island chain was completely stripped of sand, transforming a 40-km-long sandy island chain into a discontinuous series of muddy marsh islets. Models indicate that storm surge likely submerged the entire Chandeleur Island chain, at least during the latter part of the storm. The net result was destructive coastal change for the Chandeleur Islands, while Dauphin Island tended to maintain its form through landward migration.
Method and apparatus for sputtering with a plasma lens
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anders, Andre
A plasma lens for enhancing the quality and rate of sputter deposition onto a substrate is described herein. The plasma lens serves to focus positively charged ions onto the substrate while deflecting negatively charged ions, while at the same time due to the line of sight positioning of the lens, allowing for free passage of neutrals from the target to the substrate. The lens itself is formed of a wound coil of multiple turns, inside of which are deposed spaced lens electrodes which are electrically paired to impress an E field overtop the B field generated by the coil, themore » potential applied to the electrodes increasing from end to end towards the center of the lens, where the applied voltage is set to a high potential at the center electrodes as to produce a potential minimum on the axis of the lens.« less
LANDSLIDE DAMMED LAKES AT MOUNT ST. HELENS, WASHINGTON.
Meyer, William; Sabol, Martha A.; Schuster, Robert; ,
1986-01-01
The collapse of the north face of Mount St. Helens on May 18, 1980, and the debris avalanche that resulted blocked outflow from Spirit Lake and Coldwater and South Fork Castle Creeks. Spirit Lake began to increase in size and lakes began to form in the canyons of Coldwater and South Fork Castle Creeks. Coldwater and Castle Lakes would have overtopped their respective blockages in late 1981 or early 1982. Catastrophic flooding would have occurred from the breakout of Coldwater Lake while serious flooding probably would have resulted from the breakout of Castle Lake. As a result, the level of both lakes was stabilized with spillways in 1981. The three blockages are stable against liquefaction and gravitationally induced slope failure. The existence of groundwater in the blockages was observed in piezometers installed between 1981 and 1983. Groundwater mounds with water levels above lake level exist under the crest of all of the blockages.
NASA Astrophysics Data System (ADS)
Barth, Aaron M.; Clark, Peter U.; Clark, Jorie; McCabe, A. Marshall; Caffee, Marc
2016-10-01
We concluded that our new 10Be chronology records onset of retreat of a cirque glacier within the Alohart basin of southwestern Ireland 24.5 ± 1.4 ka, placing limiting constraints on reconstructions of the Irish Ice Sheet (IIS) and Kerry-Cork Ice Cap (KCIC) during the Last Glacial Maximum (LGM) (Barth et al., 2016). Knight (2016) raises two main arguments against our interpretation: (1) the glacier in the Alohart basin was not a cirque glacier, but instead a southern-sourced ice tongue from the KCIC overtopping the MacGillycuddy's Reeks, and (2) that the boulders we sampled for 10Be exposure dating were derived from supraglacial rockfall rather than transported subglacially, experienced nuclide inheritance, and are thus too old. In the following, we address both of these arguments.
Heitmuller, Franklin T.; Asquith, William H.
2008-01-01
The Texas Department of Transportation commonly builds and maintains low-water crossings (LWCs) over streams in the Edwards Plateau in Central Texas. LWCs are low-height structures, typically constructed of concrete and asphalt, that provide acceptable passage over seasonal rivers or streams with relatively low normal-depth flow. They are designed to accommodate flow by roadway overtopping during high-flow events. The streams of the Edwards Plateau are characterized by cobble- and gravel-sized bed material and highly variable flow regimes. Low base flows that occur most of the time occasionally are interrupted by severe floods. The floods entrain and transport substantial loads of bed material in the stream channels. As a result, LWCs over streams in the Edwards Plateau are bombarded and abraded by bed material during floods and periodically must be maintained or even replaced.
Timing and patterns of basin infilling as documented in Lake Powell during a drought
Pratson, Lincoln F.; Hughes-Clarke, John; Anderson, Mark; Gerber, Thomas; Twitchell, David C.; Ferrari, Ronald; Nittrouer, Charles A.; Beaudoin, Jonathan D.; Granet, Jesse; Crockett, John
2008-01-01
Between 1999 and 2005, drought in the western United States led to a >44 m fall in the level of Lake Powell (Arizona-Utah), the nation's second-largest reservoir. River discharges to the reservoir were halved, yet the rivers still incised the tops of deltas left exposed along the rim of the reservoir by the lake-level fall. Erosion of the deltas enriched the rivers in sediment such that upon entering the reservoir they discharged plunging subaqueous gravity flows, one of which was imaged acoustically. Repeat bathymetric surveys of the reservoir show that the gravity flows overtopped rockfalls and formed small subaqueous fans, locally raising sediment accumulation rates 10–100-fold. The timing of deep-basin deposition differed regionally across the reservoir with respect to lake-level change. Total mass of sediment transferred from the lake perimeter to its bottom equates to ~22 yr of river input.
NASA Astrophysics Data System (ADS)
Nicolae Lerma, A.; Bulteau, T.; Elineau, S.; Paris, F.; Pedreros, R.
2016-12-01
Marine submersion is an increasing concern for coastal cities as urban development reinforces their vulnerabilities while climate change is likely to foster the frequency and magnitude of submersions. Characterising the coastal flooding hazard is therefore of paramount importance to ensure the security of people living in such places and for coastal planning. A hazard is commonly defined as an adverse phenomenon, often represented by a magnitude of a variable of interest (e.g. flooded area), hereafter called response variable, associated with a probability of exceedance or, alternatively, a return period. Characterising the coastal flooding hazard consists in finding the correspondence between the magnitude and the return period. The difficulty lies in the fact that the assessment is usually performed using physical numerical models taking as inputs scenarios composed by multiple forcing conditions that are most of the time interdependent. Indeed, a time series of the response variable is usually not available so we have to deal instead with time series of forcing variables (e.g. water level, waves). Thus, the problem is twofold: on the one hand, the definition of scenarios is a multivariate matter; on the other hand, it is tricky and approximate to associate the resulting response, being the output of the physical numerical model, to the return period defined for the scenarios. In this study, we illustrate the problem on the district of Leucate, located in the French Mediterranean coast. A multivariate extreme value analysis of waves and water levels is performed offshore using a conditional extreme model, then two different methods are used to define and select 100-year scenarios of forcing variables: one based on joint exceedance probability contours, a method classically used in coastal risks studies, the other based on environmental contours, which are commonly used in the field of structure design engineering. We show that these two methods enable one to frame the true 100-year response variable. The selected scenarios are propagated to the shore through a high resolution flood modelling coupling overflowing and overtopping processes. Results in terms of inundated areas and inland water volumes are finally compared for the two methods, giving upper and lower bounds for the true response variables.
The formation and failure of natural dams
Costa, J.E.; Schuster, R.L.
1987-01-01
Of the numerous kinds of dams that form by natural processes, dams formed from landslides, glacial ice, and neoglacial moraines present the greatest threat to people and property. The most common types of mass movements that form landslide dams are rock and debris avalanches, rock and soil slumps and slides, and mud, debris, and earth flows. The most common initiation mechanisms for dam-forming landslides are excessive rainfall and snowmelt and earthquakes. Landslide dams can be classified into six categories based on their relation with the valley floor. Type I dams (11%) of the 81 landslide dams around the world that were classifed do not reach from one valley side to the other. Type II dams (44%) span the entire valley flood, occasionally depositing material high up on opposite valley sides. Type III dams (41%) move considerable distances both upstream and downstream from the landslide failure. Type IV dams (1%) are rare and involve the contemporaneous failure of material from both sides of a valley. Type V dams (1%) are also rare, and are created when a single landslide sends multiple tongues of debris into a valley forming two or more landslide dams in the same surfaces, that extend under the stream or valley and emerge on the opposite valley side. Many landslide dams fail shortly after formation. Overtopping is by far the most common cause of failure. Glacial ice dams can produce at least nine kinds of ice-dammed lakes. The most dangerous are lakes formed in main valleys dammed by tributary glaciers. Failure can occur by erosion of a drainage tunnel under or through the ice dam or by a channel over the ice dam. Cold polar ice dams generally drain supraglacially or marginally by downmelting of an outlet channel. Warmer temperate-ice dams tend to fail by sudden englacial or subglacial breaching and drainage. Late neoglacial moraine-dammed lakes are located in steep mountain areas affected by the advances and retreats of valley glaciers in the last several centuries. The most common reported failure mechanism is overtopping and breaching by a wave or series of waves in the lake, generated by icefalls, rockfalls, or snow or rock avalanches. Melting of ice-cores or frozen ground and piping and seepage are other possible failure mechanisms. (Lantz-PTT)
Coastal flooding hazard assessment on potentially vulnerable coastal sectors at Varna regional coast
NASA Astrophysics Data System (ADS)
Eftimova, Petya; Valchev, Nikolay; Andreeva, Nataliya
2017-04-01
Storm induced flooding is one of the most significant threats that the coastal communities face. In the light of the climate change it is expected to gain even more importance. Therefore, the adequate assessment of this hazard could increase the capability of mitigation of environmental, social, and economic impacts. The study was accomplished in the frames of the Coastal Risk Assessment Framework (CRAF) developed within the FP7 RISC-KIT Project (Resilience-Increasing Strategies for Coasts - toolkit). The hazard assessment was applied on three potentially vulnerable coastal sectors located at the regional coast of Varna, Bulgarian Black Sea coast. The potential "hotspot" candidates were selected during the initial phase of CRAF which evaluated the coastal risks at regional level. The area of interest comprises different coastal types - from natural beaches and rocky cliffs to man modified environments presented by coastal and port defense structures such as the Varna Port breakwater, groynes, jetties and beaches formed by the presence of coastal structures. The assessment of coastal flooding was done using combination of models -XBeach model and LISFLOOD inundation model applied consecutively. The XBeach model was employed to calculate the hazard intensities at the coast up to the berm crest, while LISFLOOD model was used to calculate the intensity and extent of flooding in the hinterland. At the first stage, 75 extreme storm events were simulated using XBeach model run in "non-hydrostatic" mode to obtain series of flood depth, depth-velocity and overtopping discharges at the predefined coastal cross-shore transects. Extreme value analysis was applied to the calculated hazard parameters series in order to determine their probability distribution functions. This is so called response approach, which is focused on the onshore impact rather than on the deep water boundary conditions. It allows calculation of the hazard extremes probability distribution induced by a variety of combinations of waves and surges. The considered return periods were 20, 50 and 100 years. Subsequently, the overtopping volumes corresponding to preferred return periods were fed into LISFLOOD model to calculate the intensity and extent of the hinterland flooding. For the beaches with fast-rising slopes backed by cliffs a combination of XBeach and LISFLOOD output was applied in order to properly map the flood depth and depth-velocity spatial distribution.
Dam failure analysis for the Lago El Guineo Dam, Orocovis, Puerto Rico
Gómez-Fragoso, Julieta; Heriberto Torres-Sierra,
2016-08-09
The U.S. Geological Survey, in cooperation with the Puerto Rico Electric Power Authority, completed hydrologic and hydraulic analyses to assess the potential hazard to human life and property associated with the hypothetical failure of the Lago El Guineo Dam. The Lago El Guineo Dam is within the headwaters of the Río Grande de Manatí and impounds a drainage area of about 4.25 square kilometers.The hydrologic assessment was designed to determine the outflow hydrographs and peak discharges for Lago El Guineo and other subbasins in the Río Grande de Manatí hydrographic basin for three extreme rainfall events: (1) a 6-hour probable maximum precipitation event, (2) a 24-hour probable maximum precipitation event, and (3) a 24-hour, 100-year recurrence rainfall event. The hydraulic study simulated a dam failure of Lago El Guineo Dam using flood hydrographs generated from the hydrologic study. The simulated dam failure generated a hydrograph that was routed downstream from Lago El Guineo Dam through the lower reaches of the Río Toro Negro and the Río Grande de Manatí to determine water-surface profiles developed from the event-based hydrologic scenarios and “sunny day” conditions. The Hydrologic Engineering Center’s Hydrologic Modeling System (HEC–HMS) and Hydrologic Engineering Center’s River Analysis System (HEC–RAS) computer programs, developed by the U.S. Army Corps of Engineers, were used for the hydrologic and hydraulic modeling, respectively. The flow routing in the hydraulic analyses was completed using the unsteady flow module available in the HEC–RAS model.Above the Lago El Guineo Dam, the simulated inflow peak discharges from HEC–HMS resulted in about 550 and 414 cubic meters per second for the 6- and 24-hour probable maximum precipitation events, respectively. The 24-hour, 100-year recurrence storm simulation resulted in a peak discharge of about 216 cubic meters per second. For the hydrologic analysis, no dam failure conditions are considered within the model. The results of the hydrologic simulations indicated that for all hydrologic conditions scenarios, the Lago El Guineo Dam would not experience overtopping. For the dam breach hydraulic analysis, failure by piping was the selected hypothetical failure mode for the Lago El Guineo Dam.Results from the simulated dam failure of the Lago El Guineo Dam using the HEC–RAS model for the 6- and 24-hour probable maximum precipitation events indicated peak discharges below the dam of 1,342.43 and 1,434.69 cubic meters per second, respectively. Dam failure during the 24-hour, 100-year recurrence rainfall event resulted in a peak discharge directly downstream from Lago El Guineo Dam of 1,183.12 cubic meters per second. Dam failure during sunny-day conditions (no precipitation) produced a peak discharge at Lago El Guineo Dam of 1,015.31 cubic meters per second assuming the initial water-surface elevation was at the morning-glory spillway invert elevation.The results of the hydraulic analysis indicate that the flood would extend to many inhabited areas along the stream banks from the Lago El Guineo Dam to the mouth of the Río Grande as a result of the simulated failure of the Lago El Guineo Dam. Low-lying regions in the vicinity of Ciales, Manatí, and Barceloneta, Puerto Rico, are among the regions that would be most affected by failure of the Lago El Guineo Dam. Effects of the flood control (levee) structure constructed in 2000 to provide protection to the low-lying populated areas of Barceloneta, Puerto Rico, were considered in the hydraulic analysis of dam failure. The results indicate that overtopping can be expected in the aforementioned levee during 6- and 24-hour probable maximum precipitation events. The levee was not overtopped during dam failure scenarios under the 24-hour, 100-year recurrence rainfall event or sunny-day conditions.
Hurricane Katrina storm surge distribution and field observations on the Mississippi Barrier Islands
NASA Astrophysics Data System (ADS)
Fritz, Hermann M.; Blount, Chris; Sokoloski, Robert; Singleton, Justin; Fuggle, Andrew; McAdoo, Brian G.; Moore, Andrew; Grass, Chad; Tate, Banks
2007-08-01
Hurricane Katrina (23-30 August 2005) struck low-lying coastal plains particularly vulnerable to storm surge flooding. Maximum storm surges, overland flow depths, and inundation distances were measured along the Gulf Coast of Florida, Alabama, Mississippi and Louisiana. The vehicle based survey was complemented by inspections with the reconnaissance boat along the Gulf Coast and the Mississippi Barrier Islands. The storm surge peaked to the East of Katrina's path exceeding 10 meters in several locations along the Mississippi coastline. The storm surge measurements show that the lower floors of specially designed buildings were damaged by the surge of seawater and associated wave action, while the upper floors sustained minimal wind damage. Furthermore, the storm surge measurements along New Orleans's Lake shore indicate that the 17th Street Canal levee failed prior to overtopping. The land loss on the barrier islands resulted in an increased vulnerability of the US Gulf Coast to future hurricane storm surges.
Winners and losers in the competition for space in tropical forest canopies.
Kellner, James R; Asner, Gregory P
2014-05-01
Trees compete for space in the canopy, but where and how individuals or their component parts win or lose is poorly understood. We developed a stochastic model of three-dimensional dynamics in canopies using a hierarchical Bayesian framework, and analysed 267,533 positive height changes from 1.25 m pixels using data from airborne LiDAR within 43 ha on the windward flank of Mauna Kea. Model selection indicates a strong resident's advantage, with 97.9% of positions in the canopy retained by their occupants over 2 years. The remaining 2.1% were lost to a neighbouring contender. Absolute height was a poor predictor of success, but short stature greatly raised the risk of being overtopped. Growth in the canopy was exponentially distributed with a scaling parameter of 0.518. These findings show how size and spatial proximity influence the outcome of competition for space, and provide a general framework for the analysis of canopy dynamics. © 2014 John Wiley & Sons Ltd/CNRS.
Pratchett, M S; Pisapia, C; Sheppard, C R C
2013-05-01
This study quantified background rates of mortality for Acropora cytherea in the Chagos Archipelago. Despite low levels of anthropogenic disturbance, 27.5% (149/541) of A. cytherea colonies exhibited some level of partial mortality, and 9.0% (49/541) of colonies had recent injuries. A total of 15.3% of the overall surface area of physically intact A. cytherea colonies was dead. Observed mortality was partly attributable to overtopping and/or self-shading among colonies. There were also low-densities of Acanthaster planci apparent at some study sites. However, most of the recent mortality recorded was associated with isolated infestations of the coral crab, Cymo melanodactylus. A. cytherea is a relatively fast growing coral and these levels of mortality may be biologically unimportant. However, few studies have measured background rates of coral mortality, especially in the absence of direct human disturbances. These data are important for assessing the impacts of increasing disturbances, especially in projecting likely recovery. Copyright © 2013. Published by Elsevier Ltd.
Analysis of water-level fluctuations of the US Highway 90 retention pond, Madison, Florida
Bridges, W.C.
1985-01-01
A closed basin stormwater retention pond, located 1 mile west of Madison, Florida, has a maximum storage capacity of 134.1 acre-feet at the overtopping altitude of 100.2 feet. The maximum observed altitude (July 1982 to March 1984) was 99.52 feet (126.7 acre-feet) on March 28, 1984. This report provides a technique for simulating net monthly change-in-altitude in response to rainfall and evaporation. A regression equation was developed which relates net monthly change in altitude (dependent variable) to rainfall and evaporation (independent variables). Rainfall frequency curves were developed using a log-Pearson Type III distribution of the annual, January through April, June through August, and July monthly rainfall totals for the years 1908-72, 1974, 1976-82. The altitude of the retention pond increased almost 7 feet during the 4-month period January through April 1983. The rainfall total was 35.1 inches, and the recurrence interval exceeded the 100-year January-April rainfall. (USGS)
Kallon, Senesie B; Jabati, Ansu M; Samura, Alusine
2011-01-01
The study discussed here assessed Sierra Rutile Ltd.'s (SRLs) water-cover sulfide tails management method. Monthly and quarterly water samples from SRLs Sulfide Tails Pond (STP), Total Tails Pond (TTP), and the Titan Domestic Pond (TDP) were analyzed for 15 months. Results indicated acceptable quality for the STP. From Student's t-test analysis, it was found that the mean pH of the TTP was significantly lower than that of the TDP (p < .05). Results did not indicate pollution of the TDP by SRLs tailings management. The water-cover method significantly suppressed sulfide oxidation in the STP. Concerns to be addressed, however, include potential overtopping of the pond, water level fluctuations, and the need for periodic reinforcement of the tailings embankments. A dedicated environmental monitoring campaign that includes other proximate water bodies is suggested; this should inform timely mitigation of any environmental contamination and promote sound environmental and public health outcomes.
NASA Astrophysics Data System (ADS)
Rohmer, Jeremy; Idier, Deborah; Bulteau, Thomas; Paris, François
2016-04-01
From a risk management perspective, it can be of high interest to identify the critical set of offshore conditions that lead to inundation on key assets for the studied territory (e.g., assembly points, evacuation routes, hospitals, etc.). This inverse approach of risk assessment (Idier et al., NHESS, 2013) can be of primary importance either for the estimation of the coastal flood hazard return period or for constraining the early warning networks based on hydro-meteorological forecast or observations. However, full-process based models for coastal flooding simulation have very large computational time cost (typically of several hours), which often limits the analysis to a few scenarios. Recently, it has been shown that meta-modelling approaches can efficiently handle this difficulty (e.g., Rohmer & Idier, NHESS, 2012). Yet, the full-process based models are expected to present strong non-linearities (non-regularities) or shocks (discontinuities), i.e. dynamics controlled by thresholds. For instance, in case of coastal defense, the dynamics is characterized first by a linear behavior of the waterline position (increase with increasing offshore conditions), as long as there is no overtopping, and then by a very strong increase (as soon as the offshore conditions are energetic enough to lead to wave overtopping, and then overflow). Such behavior might make the training phase of the meta-model very tedious. In the present study, we propose to explore the feasibility of active learning techniques, aka semi-supervised machine learning, to track the set of critical conditions with a reduced number of long-running simulations. The basic idea relies on identifying the simulation scenarios which should both reduce the meta-model error and improve the prediction of the critical contour of interest. To overcome the afore-described difficulty related to non-regularity, we rely on Support Vector Machines, which have shown very high performance for structural reliability assessment. The developments are done on a cross-shore case, using the process-based SWASH model. The related computational time is 10 hours for a single run. The dynamic forcing conditions are parametrized by several factors (storm surge S, significant wave height Hs, dephasing between tide and surge, etc.). In particular, we validated the approach with respect to a reference set of 400 long-running simulations in the domain of (S ; Hs). Our tests showed that the tracking of the critical contour can be achieved with a reasonable number of long-running simulations of a few tens.
An innovative early warning system for floods and operational risks in harbours
NASA Astrophysics Data System (ADS)
Smets, Steven; Bolle, Annelies; Mollaert, Justine; Buitrago, Saul; Gruwez, Vincent
2016-04-01
Early Warning Systems (EWS) are nowadays becoming fairly standard in river flood forecasting or in large scale hydrometeorological predictions. For complex coastal morphodynamic problems or in the vicinity of complex coastal structures, such as harbours, EWS are much less used because they are both technically and computationally still very challenging. To advance beyond the state-of-the-art, the EU FP7 project Risc-KIT (www.risc-kit.eu) is developing prototype EWS which address specifically these topics. This paper describes the prototype EWS which IMDC has developed for the case study site of the harbour of Zeebrugge. The harbour of Zeebrugge is the largest industrial seaport on the coast of Belgium, extending more than 3 km into the sea. Two long breakwaters provide shelter for the inner quays and docks for regular conditions and frequent storms. Extreme storms surges and waves can however still enter the harbour and create risks for the harbour operations and infrastructure. The prediction of the effects of storm surges and waves inside harbours are typically very complex and challenging, due to the need of different types of numerical models for representing all different physical processes. In general, waves inside harbours are a combination of locally wind generated waves and offshore wave penetration at the port entrance. During extreme conditions, the waves could overtop the quays and breakwaters and flood the port facilities. Outside a prediction environment, the conditions inside the harbour could be assessed by superimposing processes. The assessment can be carried out by using a combination of a spectral wave model (i.e. SWAN) for the wind generated waves and a Boussinesq type wave model (i.e. Mike 21 BW) for the wave penetration from offshore. Finally, a 2D hydrodynamic model (i.e. TELEMAC) can be used to simulate the overland flooding inside the port facilities. To reproduce these processes in an EWS environment, an additional challenge is to cope with the limitations of the calculation engines. This is especially true with the Boussinesq model. A model train is proposed that integrates processed based modelling, for wind generated waves, with an intelligent simplification of the Boussinesq model for the wave penetration effects. These wave conditions together with the extreme water levels (including storm surge) can then be used to simulate the overtopping/overflow behaviour for the quays. Finally, the hydrodynamic model TELEMAC is run for the inundation forecast inside the port facilities. The complete model train was integrated into the Deltares Delft FEWS software to showcase the potential for real time operations.
Cui, P.; Dang, C.; Zhuang, J.; You, Y.; Chen, X.; Scott, K.M.
2012-01-01
Landslides and rock avalanches triggered by the 2008 Wenchuan Earthquake produced 257 landslide dams, mainly situated along the eastern boundary of the Qinghai-Tibet Plateau where rivers descend approximately 3,000 m into the Sichuan Basin. The largest of these dams blocked the Tongkou River (a tributary of the Fujiang River) at Tangjiashan. The blockage, consisting of 2. 04 ?? 10 7 m 3 of landslide debris, impounded a lake with a projected maximum volume of 3. 15 ?? 10 8 m 3, potentially inundating 8. 92 km 2 of terrain. Its creation during the rainy season and the possibility of an uncontrolled release posed a serious, impending threat to at least 1. 3 million people downstream that could add substantially to the total of 69,200 individuals directly killed by the earthquake. Risk assessment of the blockage indicated that it was unlikely to collapse suddenly, and that eventual overtopping could be mitigated by notching the structure in order to create an engineered breach and achieve safe drainage of the lake. In addition to the installation of monitoring and warning instrumentation, for emergency planning we estimated several outburst scenarios equivalent to 20, 25, 33, and 50% of the dam failing suddenly, creating, respectively, 3. 35, 3. 84, 4. 22, and 4. 65 km 2 of flooded area, and overbank water depths of 4. 6, 5. 1, 5. 7, and 6. 2 m, respectively, in Mianyang, the second largest city in Sichuan Province, 48 km downstream from the blockage. Based on these scenarios, recommendations and plans for excavating a sluiceway, draining the lake, and downstream evacuation were proposed and later were implemented successfully, with the blockage breached by overtopping on June 10, less than a month after dam emplacement. The peak discharge of the release only slightly exceeded the flood of record at Mianyang City. No lives were lost, and significant property damage was avoided. Post-breaching evaluation reveals how future similar mitigation can be improved. Although initial breach erosion was slow, later erosion was judged uncontrollably rapid; increased slope of the engineered channel and adoption of a compound, trapezoid-triangular cross-section can be considered, as can other measures to control the rate of breach incision. Evacuees from Mianyang City spent an unnecessarily long time (12 days) in temporary settlements; more precise risk management planning can reduce this time in the future. ?? 2010 Springer-Verlag.
A laser profilometry technique for monitoring fluvial dike breaching in laboratory experiments
NASA Astrophysics Data System (ADS)
Dewals, Benjamin; Rifai, Ismail; Erpicum, Sébastien; Archambeau, Pierre; Violeau, Damien; Pirotton, Michel; El kadi Abderrezzak, Kamal
2017-04-01
A challenging aspect for experimental modelling of fluvial dike breaching is the continuous monitoring of the transient breach geometry. In dam breaching cases induced by flow overtopping over the whole breach crest (plane erosion), a side view through a glass wall is sufficient to monitor the breach formation. This approach can be extended for 3D dam breach tests (spatial erosion) if the glass wall is located along the breach centreline. In contrast, using a side view does not apply for monitoring fluvial dike breaching, because the breach is not symmetric in this case. We present a non-intrusive, high resolution technique to record the breach development in experimental models of fluvial dikes by means of a laser profilometry (Rifai et al. 2016). Most methods used for monitoring dam and dike breaching involve the projection of a pattern (fringes, grid) on the dam or dike body and the analysis of its deformation on images recorded during the breaching (e.g., Pickert et al. 2011, Frank and Hager 2014). A major limitation of these methods stems from reflection on the water surface, particularly in the vicinity of the breach where the free surface is irregular and rippled. This issue was addressed by Spinewine et al. (2004), who used a single laser sheet so that reflections on the water surface were strongly limited and did not hamper the accurate processing of each image. We have developed a similar laser profilometry technique tailored for laboratory experiments on fluvial dike breaching. The setup is simple and relatively low cost. It consists of a digital video camera (resolution of 1920 × 1080 pixels at 60 frames per second) and a swiping red diode 30 mW laser that enables the projection of a laser sheet over the dike body. The 2D image coordinates of each deformed laser profile incident on the dike are transformed into 3D object coordinates using the Direct Linear Transformation (DLT) algorithm. All 3D object coordinates computed over a swiping cycle of the laser are merged to generate a cloud of points. The DLT-based image processing method uses control points and reference axes, so that no prior knowledge is needed on the position, orientation and intrinsic characteristics of the camera, nor on the laser position. Refraction of the light and laser rays across the water surface needs to be taken into account, because the dike is partially submerged during the experiments. An ad hoc correction is therefore applied using the Snell-Descartes law. For this purpose, planar approximations are used to describe the shape of the water surface. In the presentation, we will discuss the resulting uncertainty and will detail the validation of the developed method based on configurations of known geometry with various complexity. The presented laser profilometry technique allows for a rapid non-intrusive measurement of the dike geometry evolution. It is readily available for laboratory experiments and has proven its performance (Rifai et al. 2017). Further adjustments are needed for its application to cohesive dike material due to the reduced visibility resulting from the higher turbidity of water. References Frank, P.-J., Hager, W.H. (2014). Spatial dike breach: Accuracy of photogrammetric measurement system. Proc. of the International Conference on Fluvial Hydraulics, River Flow 2014, 1647-1654. Pickert, G., Weitbrecht, V., Bieberstein A. (2011). Beaching of overtopped river embankments controlled by apparent cohesion. Journal of Hydraulic Research 49:143-156. Rifai, I., Erpicum, S., Archambeau, P., Violeau, D., Pirotton, M., El kadi Abderrezzak, K., Dewals, B. (2016). Monitoring topography of laboratory fluvial dike models subjected to breaching based on a laser profilometry technique. Proc. of the International Symposium on River Sedimentation (ISRS): Stuttgart, 19-22 September 2016. Rifai, I., Erpicum, S., Archambeau, P., Violeau, D., Pirotton, M., El kadi Abderrezzak, K., Dewals, B. (2017). Overtopping induced failure of non-cohesive, homogenous fluvial dikes. Water Resources Research, under revision. Spinewine, B., Delobbe, A., Elslander, L., Zech, Y. (2004). Experimental investigation of the breach growth process in sand dikes. Proc. of the International Conference on Fluvial Hydraulics, River Flow 2004, 2:983-991.
Plant, Nathaniel G.; Thompson, David M.; Elias, Edwin; Wang, Ping; Rosati, Julie D.; Roberts, Tiffany M.
2011-01-01
Using Delft3D, a Chandeleur Island model was constructed to examine the sediment-transport patterns and morphodynamic change caused by Hurricane Katrina and similar storm events. The model setup included a coarse Gulf of Mexico domain and a nested finer-resolution Chandeleur Island domain. The finer-resolution domain resolved morphodynamic processes driven by storms and tides. A sensitivity analysis of the simulated morphodynamic response was performed to investigate the effects of variations in surge levels. The Chandeleur morphodynamic model reproduced several important features that matched observed morphodynamic changes. A simulation of bathymetric change driven by storm surge alone (no waves) along the central portion of the Chandeleur Islands showed (1) a general landward retreat and lowering of the island chain and (2) multiple breaches that increased the degree of island dissection. The locations of many of the breaches correspond with the low-lying or narrow sections of the initial bathymetry. The major part of the morphological change occurred prior to the peak of the surge when overtopping of the islands produced a strong water-level gradient and induced significant flow velocities.
Knight, P.G.; Jennings, C.E.; Waller, R.I.; Robinson, Z.P.
2007-01-01
Advance of part of the margin of the Greenland ice sheet across a proglacial moraine ridge between 1968 and 2002 caused progressive changes in moraine morphology, basal ice formation, debris release, ice-marginal sediment storage, and sediment transfer to the distal proglacial zone. When the ice margin is behind the moraine, most of the sediment released from the glacier is stored close to the ice margin. As the margin advances across the moraine the potential for ice-proximal sediment storage decreases and distal sediment flux is augmented by reactivation of moraine sediment. For six stages of advance associated with distinctive glacial and sedimentary processes we describe the ice margin, the debris-rich basal ice, debris release from the glacier, sediment routing into the proglacial zone, and geomorphic processes on the moraine. The overtopping of a moraine ridge is a significant glaciological, geomorphological and sedimentological threshold in glacier advance, likely to cause a distinctive pulse in distal sediment accumulation rates that should be taken into account when glacial sediments are interpreted to reconstruct glacier fluctuations. ?? 2007 Swedish Society for Anthropology and Geography.
Stream capture to form Red Pass, northern Soda Mountains, California
Miller, David; Mahan, Shannon
2014-01-01
Red Pass, a narrow cut through the Soda Mountains important for prehistoric and early historic travelers, is quite young geologically. Its history of downcutting to capture streams west of the Soda Mountains, thereby draining much of eastern Fort Irwin, is told by the contrast in alluvial fan sediments on either side of the pass. Old alluvial fan deposits (>500 ka) were shed westward off an intact ridge of the Soda Mountains but by middle Pleistocene time, intermediate-age alluvial fan deposits (~100 ka) were laid down by streams flowing east through the pass into Silurian Valley. The pass was probably formed by stream capture driven by high levels of groundwater on the west side. This is evidenced by widespread wetland deposits west of the Soda Mountains. Sapping and spring discharge into Silurian Valley over millennia formed a low divide in the mountains that eventually was overtopped and incised by a stream. Lessons include the importance of groundwater levels for stream capture and the relatively youthful appearance of this ~100-200 ka feature in the slowly changing Mojave Desert landscape.
Yasumura, Yuko; Ishida, Atsushi
2011-01-01
We examined temporal changes in the amount of nitrogenous compounds in leaves from the outer and inner parts of the crown of Quercus myrsinaefolia growing in a seasonal climate. Throughout the leaf life span, metabolic protein and Rubisco content closely correlated with total nitrogen content, while structural protein content was relatively stable after full leaf expansion. Chlorophyll content was affected by shading as well as total nitrogen content in outer leaves that were overtopped by new shoots in the second year. Outer leaves showed a large seasonal variation in photosynthetic nitrogen-use efficiency (PNUE; the light-saturated photosynthetic rate per unit leaf nitrogen content) during the first year of their life, with PNUE decreasing from the peak in summer towards winter. Outer and inner leaves both showed age-related decline in PNUE in the second year. There were no such drastic changes in leaf nitrogen partitioning that could explain seasonal and yearly variations in PNUE. Nitrogen resorption occurred in overwintering leaves in spring. Metabolic protein explained the majority of nitrogen being resorbed, whereas structural protein, which was low in degradability, contributed little to nitrogen resorption.
Blodgett, J.C.; McConaughy, C.E.
1986-01-01
In volume 2, seven procedures now being used for design of rock riprap installations were evaluated using data from 26 field sites. Four basic types of riprap failures were identified: Particle erosion, translational slide, modified slump, and slump. Factors associated with riprap failure include stone size , bank side slope, size gradation, thickness, insufficient toe or endwall, failure of the bank material, overtopping during floods, and geomorphic changes in the channel. A review of field data and the design procedures suggests that estimates of hydraulic forces acting on the boundary based on flow velocity rather than shear stress are more reliable. Several adjustments for local conditions, such as channel curvature, superelevation, or boundary roughness, may be unwarranted in view of the difficulty in estimating critical hydraulic forces for which the riprap is to be designed. Success of the riprap is related not only to the appropriate procedure for selecting stone size, but also to the reliability of estimated hydraulic and channel factors applicable to the site. (See also W89-04910) (Author 's abstract)
Flooding in southeastern United States from tropical storm Alberto, July 1994
Stamey, Timothy C.; Leavesley, George H.; Lins, Harry F.; Nobilis, Franz; Parker, Randolph S.; Schneider, Verne R.; van de Ven, Frans H.M.
1997-01-01
In July 1994, parts of central and southwestern Georgia, southeastern Alabama, and the western panhandle of Florida were devastated by floods resulting from rainfall produced by Tropical Storm Alberto. Entire communities were inundated by flood waters as numerous streams reached peak stages and discharges far greater than previous floods in the Flint, Ocmulgee, and Choctawhatchee River basins. The flooding resulted in 33 deaths in towns and small communities along or near the overflowing streams. President Clinton declared 78 counties as Federal disaster areas: 55 in Georgia, 10 in Alabama, and 13 in Florida. The Flint River and Ocmulgee River basins in Georgia experienced floods that exceeded the 100-year recurrence interval discharge along almost their entire lengths. Travel was disrupted as railroad and highway bridges and culverts were overtopped an, in many cases, washed out. Total flood damages to public and private property were estimated at nearly $1 billion dollars. The destruction caused by this storm serves to emphasize the high cost imposed upon life and property by flood disasters; and thus, highlight the importance of preparing for, monitoring, and documenting such occurrences.
Koohpeyma, Hamid Reza; Vakili, Amir Hossein; Moayedi, Hossein; Panjsetooni, Alireza; Nazir, Ramli
2013-01-01
Internal erosion is known as the most important cause of dam failure after overtopping. It is important to improve the erosion resistance of the erodible soil by selecting an effective technique along with the reasonable costs. To prevent internal erosion of embankment dams the use of chemical stabilizers that reduce the soil erodibility potential is highly recommended. In the present study, a lignin-based chemical, known as lignosulfonate, is used to improve the erodibility of clayey sand specimen. The clayey sand was tested in various hydraulic heads in terms of internal erosion in its natural state as well as when it is mixed with the different percentages of lignosulfonate. The results show that erodibility of collected clayey sand is very high and is dramatically reduced by adding lignosulfonate. Adding 3% of lignosulfonate to clayey sand can reduce the coefficient of soil erosion from 0.01020 to 0.000017. It is also found that the qualitative erodibility of stabilized soil with 3% lignosulfonate is altered from the group of extremely rapid to the group of moderately slow.
Flynn, Robert H.; Burns, Ronda L.
1997-01-01
The computed contraction scour for all modelled flows was 0.0 feet. Abutment scour ranged from 5.3 to 8.2 ft. The worst-case abutment scour occurred at the right abutment for the incipient-overtopping discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Diverting lava flows in the lab
Dietterich, Hannah; Cashman, Katharine V.; Rust, Alison C.; Lev, Einat
2015-01-01
Recent volcanic eruptions in Hawai'i, Iceland and Cape Verde highlight the challenges of mitigating hazards when lava flows threaten infrastructure. Diversion barriers are the most common form of intervention, but historical attempts to divert lava flows have met with mixed success and there has been little systematic analysis of optimal barrier design. We examine the interaction of viscous flows of syrup and molten basalt with barriers in the laboratory. We find that flows thicken immediately upslope of an obstacle, forming a localized bow wave that can overtop barriers. Larger bow waves are generated by faster flows and by obstacles oriented at a high angle to the flow direction. The geometry of barriers also influences flow behaviour. Barriers designed to split or dam flows will slow flow advance, but cause the flow to widen, whereas oblique barriers can effectively divert flows, but may also accelerate flow advance. We argue that to be successful, mitigation of lava-flow hazards must incorporate the dynamics of lava flow–obstacle interactions into barrier design. The same generalizations apply to the effect of natural topographic features on flow geometry and advance rates.
Numerical modelling of glacial lake outburst floods using physically based dam-breach models
NASA Astrophysics Data System (ADS)
Westoby, M. J.; Brasington, J.; Glasser, N. F.; Hambrey, M. J.; Reynolds, J. M.; Hassan, M. A. A. M.; Lowe, A.
2015-03-01
The instability of moraine-dammed proglacial lakes creates the potential for catastrophic glacial lake outburst floods (GLOFs) in high-mountain regions. In this research, we use a unique combination of numerical dam-breach and two-dimensional hydrodynamic modelling, employed within a generalised likelihood uncertainty estimation (GLUE) framework, to quantify predictive uncertainty in model outputs associated with a reconstruction of the Dig Tsho failure in Nepal. Monte Carlo analysis was used to sample the model parameter space, and morphological descriptors of the moraine breach were used to evaluate model performance. Multiple breach scenarios were produced by differing parameter ensembles associated with a range of breach initiation mechanisms, including overtopping waves and mechanical failure of the dam face. The material roughness coefficient was found to exert a dominant influence over model performance. The downstream routing of scenario-specific breach hydrographs revealed significant differences in the timing and extent of inundation. A GLUE-based methodology for constructing probabilistic maps of inundation extent, flow depth, and hazard is presented and provides a useful tool for communicating uncertainty in GLOF hazard assessment.
Koohpeyma, Hamid Reza; Vakili, Amir Hossein; Panjsetooni, Alireza; Nazir, Ramli
2013-01-01
Internal erosion is known as the most important cause of dam failure after overtopping. It is important to improve the erosion resistance of the erodible soil by selecting an effective technique along with the reasonable costs. To prevent internal erosion of embankment dams the use of chemical stabilizers that reduce the soil erodibility potential is highly recommended. In the present study, a lignin-based chemical, known as lignosulfonate, is used to improve the erodibility of clayey sand specimen. The clayey sand was tested in various hydraulic heads in terms of internal erosion in its natural state as well as when it is mixed with the different percentages of lignosulfonate. The results show that erodibility of collected clayey sand is very high and is dramatically reduced by adding lignosulfonate. Adding 3% of lignosulfonate to clayey sand can reduce the coefficient of soil erosion from 0.01020 to 0.000017. It is also found that the qualitative erodibility of stabilized soil with 3% lignosulfonate is altered from the group of extremely rapid to the group of moderately slow. PMID:24459437
NASA Astrophysics Data System (ADS)
Ismail, Nabil; Williams, Jeffress
2013-04-01
This paper presents an assessment of global sea level rise and the need to incorporate projections of rise into management plans for coastal adaptation. It also discusses the performance of a shoreline revetment; M. Ali Seawall, placed to protect the land against flooding and overtopping at coastal site, within Abu Qir Bay, East of Alexandria, Egypt along the Nile Delta coast. The assessment is conducted to examine the adequacy of the seawall under the current and progressive effects of climate change demonstrated by the anticipated sea level rise during this century. The Intergovernmental Panel on Climate Change (IPCC, 2007) predicts that the Mediterranean will rise 30 cm to 1 meter this century. Coastal zone management of the bay coastline is of utmost significance to the protection of the low agricultural land and the industrial complex located in the rear side of the seawall. Moreover this joint research work highlights the similarity of the nature of current and anticipated coastal zone problems, at several locations around the world, and required adaptation and protection measures. For example many barrier islands in the world such as that in the Atlantic and Gulf of Mexico coasts of the U.S., lowland and deltas such as in Italy and the Nile Delta, and many islands are also experiencing significant levels of erosion and flooding that are exacerbated by sea level rise. Global Climatic Changes: At a global scale, an example of the effects of accelerated climate changes was demonstrated. In recent years, the impacts of natural disasters are more and more severe on coastal lowland areas. With the threats of climate change, sea level rise storm surge, progressive storm and hurricane activities and potential subsidence, the reduction of natural disasters in coastal lowland areas receives increased attention. Yet many of their inhabitants are becoming increasingly vulnerable to flooding, and conversions of land to open ocean. These global changes were recently demonstrated in autumn 2010 when the storm Becky reached the Santander Bay, Spain. As reported by THESEUS, the FP-7 EU project (2009-2013), the peak of nearshore significant wave height was about 8 m, the storm surge reached 0.6 m, with tidal level of 90% of the tidal range. The latest storm in December 2010, which hit the Nile Delta and which was the severest in the last decades showed that generated surges, up to 1.0 m as well as a maximum of 7.5 m wave height in the offshore of Alexandria presented a major natural hazard in coastal zones in terms of wave run up and overtopping. Along the US Atlantic Coast, where Hurricane Sandy this autumn and Hurricane Irene in 2011 left chaos in their wakes, a perfect storm of rising sea levels and dense coastal development at high risk . Super storm Sandy sent a storm surge of 4-5 m onto New Jersey's and New York's fragile barrier island and urban shorelines, causing an estimated 70 billion (USD) in damages and widespread misery for coastal inhabitants. Sea Level Rise and Impact on Upgrade of Coastal Structures: Williams (2013) highlights in his recent paper that adaptation planning on national scales in the USA for projected sea-level rise of 0.5-2 m by A.D. 2100 is advisable. Further he points out that sea-level rise, as a major driving force of change for coastal regions, is becoming increasingly important as a hazard to humans and urban areas in the coastal zone worldwide as global climate change takes effect. During the 20th century, sea level began rising at a global average rate of 1.7 mm/yr (). The current average rise rate is 3.1 mm/yr, a 50% increase over the past two decades. Many regions are experiencing even greater rise rates due to local geophysical (e.g., Louisiana, Chesapeake Bay) and oceanographic (mid-Atlantic coast) forces. Further the Mississippi River Delta plain region of Louisiana has much higher than average rates of LRSL rise due to geologic factors such as subsidence and man-made alterations to the delta plain, wetlands, and coast. As a result the entire coast is highly erosional and highly vulnerable to sea-level rise and storms. Detailed mapping studies over the past two decades show that subject to sea-level rise, subsidence, frequent major storms, and reduced sediment budget. Sea-level rise, with high regional variability, is exhibiting acceleration and is expected to continue for centuries unless mitigation is enacted to reduce atmospheric carbon. Low lying coastal plain regions, deltas, and most islands are highly vulnerable. The assessment of Abu-Qir seawall included the review of the current-2011design and past upgrades since 1830. Hydrodynamic analyses were conducted to estimate wave height distributions, wave run up and overtopping over the seawall. Use has been made of the Modified ImSedTran-2D model (Ismail et.al, 2012) as well as universal design standards (EurOtop, 2008). Comparison of the predicted overtopping with the observed wave overtopping volumes during the 8hrs-2010 storm, allowed the verification of the used universal design tools. Based on the results for worst wave design scenarios and anticipated sea level rise after 50 years (50 cm), recommendations are given to increase the height of the seawall cap, to strengthen the beach top and back slope with a facility to drain storm water to increase coastal resilience. Recommendations: Protection of coastal fringes requires that new design alternatives to protect eroding lowland shorelines of deltas and barrier islands should be explored. These soft engineering alternatives are such as beach nourishment, sand dunes stabilization, and storm barriers. Use of integrated barrier island and coastal lagoons & wetlands would act as a buffer zone to defend main land. The sustainability of the integrated natural systems would require (1) barrier island and shoreline restoration (2) hydrologic and vegetation restoration of coastal lagoons, and (3) relocation of development in highly vulnerable areas. Such adaptation planning and restoration projects will require a major undertaking by national governments and international institutions. Joint research projects between international organizations such as: USA research centers ( USGS, NOAA, Corps of Engineers), EU sponsored project groups, EU coastal marine centers as well as other world wide coastal research institutes (CoRI, Alexandria) are encouraged to advance the state of the art on managing coasts to adapt to sea level rise employing cost-effective coastal protection technologies. References 1.Williams, S.J.,"Sea-Level Rise Implications for Coastal Regions", Journal of Coastal Research, Vol. 63, 2013. 2.Ismail, N.,Wiegel, R., "Sustainable Solutions for Coastal Zone Management of Lowland and River Delta Coastlines", Proc. International Conference- Littoral 2012, Ostende, Belgium, November 27-29, 2012. 3.Ismail, N., Iskander, M., and El-Sayed, W. "Assessment of Coastal Flooding at Southern Mediterranean with Global Outlook for Lowland Coastal Zones", Proc. International Conference on Coastal Engineering, ASCE, July 1-6, 2012, Santander, Spain. 4.Moser, S. C., Williams,J.S., and Boesch, D. F., " Wicked Challenges at Land's End: Managing Coastal Vulnerability Under Climate Change'', Annual. Review of Environmental Resources, 37:51-78, 2012.
Olson, Scott A.
1996-01-01
Contraction scour for all modelled flows ranged from 0.0 to 0.8 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 6.1 to 11.6 ft. The worst-case abutment scour occurred at the incipient-overtopping discharge, which was 50 cfs lower than the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scouredstreambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particlesize distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Modeling Wave Overtopping on the Chandeleur Islands during Hurricane Katrina using XBeach
NASA Astrophysics Data System (ADS)
Lindemer, C. A.; Plant, N.; Puleo, J.; Thompson, D.
2008-12-01
Tropical cyclones that enter or form in the Gulf of Mexico generate storm surge and large waves that impact low-lying coastlines of along the Gulf Coast. Much of the Gulf Coast is ringed with barrier islands that provide inland marshes and the mainland some protection from storm events. The Chandeleur Islands, are located 161 km east of New Orleans, Louisiana and are oriented from north to south, and act to dissipate some of this energy. After a series of major storm events between 2001 and 2005, Hurricane Katrina's devastation in the fall of 2005 was particularly violent, destroying two-thirds of the area associated with the island chain. We would like to evaluate the predictability of hurricane-induced barrier island erosion and accretion. We test the ability of a time-dependent hydrodynamic and morphodynamic model, XBeach, to predict the impact of Hurricane Katrina on portions of Chandeleur Islands. Pre-storm LIDAR-derived bathymetry/topography and surge and wave data were used to drive a number of XBeach simulations. Model-predicted morphology was compared to post-storm LIDAR data. The accuracy of these predictions, including model sensitivity tests with varying grid size and temporal resolutions, are presented.
Olson, Scott A.; Degnan, James R.
1997-01-01
Contraction scour computed for all modelled flows was 0.0 ft. Computed left abutment scour ranged from 9.4 to 10.2 ft. with the worst-case scour occurring at the 500-year discharge. Computed right abutment scour ranged from 2.7 to 5.7 ft. with the worst-case scour occurring at the incipient roadway-overtopping discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Erosion and sedimentation during the September 2015 flooding of the Kinu River, central Japan.
Dan Matsumoto; Sawai, Yuki; Yamada, Masaki; Namegaya, Yuichi; Shinozaki, Tetsuya; Takeda, Daisuke; Fujino, Shigehiro; Tanigawa, Koichiro; Nakamura, Atsunori; Pilarczyk, Jessica E
2016-09-28
Erosional and sedimentary features associated with flooding have been documented in both modern and past cases. However, only a few studies have demonstrated the relationship between these features and the corresponding hydraulic conditions that produced them, making it difficult to evaluate the magnitude of paleo-flooding. This study describes the characteristics associated with inundation depth and flow direction, as well as the erosional and sedimentary features resulting from the disastrous flooding of the Kinu River, central Japan, in September 2015. Water levels rose rapidly due to heavy rainfall that eventually overtopped, and subsequently breached, a levee in Joso City, causing destructive flooding on the surrounding floodplain. Distinctive erosional features are found next to the breached levee, while depositional features, such as a sandy crevasse-splay deposit are found further away from the breach. The deposit can be divided into three units based on sedimentary facies. The vertical and lateral changes of these sedimentary facies may be the result of temporal and spatial changes associated with flow during the single flooding event. These observations and quantitative data provide information that can be used to reveal the paleohydrology of flood deposits in the stratigraphic record, leading to improved mitigation of future flooding disasters.
Geologic setting and stratigraphy of the Ziegler Reservoir fossil site, Snowmass Village, Colorado
Pigati, Jeff S.; Miller, Ian M.; Johnson, Kirk R.; Honke, Jeffrey S.; Carrara, Paul E.; Muhs, Daniel R.; Skipp, Gary; Bryant, Bruce
2014-01-01
The geologic setting of the Ziegler Reservoir fossil site is somewhat unusual – the sediments containing the Pleistocene fossils were deposited in a lake on top of a ridge. The lake basin was formed near the Town of Snowmass Village, Colorado when a glacier flowing down Snowmass Creek Valley became thick enough to overtop a low point in the eastern valley wall and entered the head of Brush Creek Valley. When the glacier retreated at the end of the marine isotope stage (MIS) 6, ~155-130 ka (thousands of years before present), the Brush Creek Valley lobe left behind a moraine that impounded a small alpine lake. The lake was initially ~10 m deep and was highly productive during most of its existence based on the abundant and exquisitely preserved organic material present in the sediments. Over time, the basin slowly filled with (mostly) eolian sediment such that by ~85 ka it contained more of a marsh or wetland than a true lake. Open water conditions returned briefly between ~75 and 55 ka before the impoundment was finally breached to the east, establishing ties with the Brush Creek drainage system and creating an alpine meadow that persisted until historic times.
Medeiros, Arthur C.; Chimera, Charles G.; Loope, Lloyd L.; Joe, Stephanie M.; Krushelnycky, Paul D.
2000-01-01
The annual, endemic, coastal herb Centaurium sebaeoides is the only native Hawaiian species in the gentian family. The U.S. Fish and Wildlife Service listed it as Endangered under the Endangered Species Act on 29 October 1991. Before surveys reported here, the total population of this species statewide was estimated at 80-110 individuals in eight populations. During counts made in April and May 1997, following ample winter rains, 12 populations of C. sebaeoides with a total of 6300-6600 plants were noted on five islands (Kaua'i, O'ahu, Lana'i, Moloka'i, and Maui). Five populations were mapped with a global positioning system and counted; in the remaining seven populations, the numbers of individuals were estimated. More recent surveys in 1998-1999 estimated a total of only 60-80 individuals at all sites. Such dramatic population fluctuations are believed to be related to the sporadic occurrence of winter rains. Threats that further contribute to the rarity of the species include (1) displacement and overtopping by salt-tolerant nonnative woody species, especially Casuarina spp., (2) trampling and erosion of habitat by ungulates, and (3) damage caused by off-road vehicles.
'Carolina' session growth, reproduction, and biomass of hydrilla in North Carolina
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harlan, S.M.; Davis, G.J.; Pesacreta, G.
1984-06-01
Certain morphological and physiological characteristics are associated with the phenomenal ability of hydrilla to invade an aquatic system, overtop more desirable native rooted aquatic species, and form very dense monospecific mats. One of these adaptations is the formation of tubers which are vegetative propagules formed at the ends of positively geotropic rhizomes (Van, Haller, and Garrard 1978). Tubers develop in the hydrosoil and thus are very resistant to all control methods. Also, hydrilla's ability to become established and photosynthesize under low light intensities is unequaled by any other submersed rooted aquatic macrophyte (Van, Haller, and Bowes 1976). Hydrilla growing inmore » lakes in Umstead State Park in North Carolina was first identified by William Haller in 1981 and had apparently been established in the area for several years. Since its initial identification, hydrilla has been found in 18 other water bodies, all in Wake Country. Hydrilla has the potential to become a very serious problem as there are presently no effective means of halting its spreading or eradicating it after infestation occurs. For effective management in North Carolina, knowledge of the growth, reproduction, and biomass of hydrilla in North Carolina is needed. This research addresses these questions.« less
Flood mapping from Sentinel-1 and Landsat-8 data: a case study from river Evros, Greece
NASA Astrophysics Data System (ADS)
Kyriou, Aggeliki; Nikolakopoulos, Konstantinos
2015-10-01
Floods are suddenly and temporary natural events, affecting areas which are not normally covered by water. The influence of floods plays a significant role both in society and the natural environment, therefore flood mapping is crucial. Remote sensing data can be used to develop flood map in an efficient and effective way. This work is focused on expansion of water bodies overtopping natural levees of the river Evros, invading the surroundings areas and converting them in flooded. Different techniques of flood mapping were used using data from active and passive remote sensing sensors like Sentinlel-1 and Landsat-8 respectively. Space borne pairs obtained from Sentinel-1 were processed in this study. Each pair included an image during the flood, which is called "crisis image" and another one before the event, which is called "archived image". Both images covering the same area were processed producing a map, which shows the spread of the flood. Multispectral data From Landsat-8 were also processed in order to detect and map the flooded areas. Different image processing techniques were applied and the results were compared to the respective results of the radar data processing.
Striker, Lora K.; Medalie, Laura
1997-01-01
Contraction scour for all modelled flows was 0.0 ft. Abutment scour ranged from 5.8 to 6.8 ft at the left abutment and 9.4 to 14.4 ft at the right abutment. The worst-case abutment scour occurred at the incipient roadway-overtopping discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Ivanoff, Michael A.; Medalie, Laura
1997-01-01
Contraction scour for all modelled flows ranged from 0.0 to 1.5 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge, which was less than the 100-year discharge. Abutment scour ranged from 12.4 to 24.4 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scouredstreambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particlesize distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Experimental Study on Tsunami Risk Reduction on Coastal Building Fronted by Sea Wall
Khan, M. T. R.; Shirazi, S. M.
2014-01-01
This experimental study was conducted to idealize the efficacy of sea wall in controlling the tsunami forces on onshore structures. Different types of sea walls were placed in front of the building model. The tsunami forces and the wave heights were measured with and without the sea wall conditions. Types of sea wall, wall height, and wall positions were varied simultaneously to quantify the force reductions. Maximum of 41% forces was reduced by higher sea wall, positioned closer proximity to the model whereas this reduction was about 27% when the wall height was half of the high wall. Experimental investigations revealed that wall with adequate height and placed closer to the structures enables a satisfactory predictor of the force reduction on onshore structures. Another set of tests were performed with perforated wall placing near the building model. Less construction cost makes the provision of perforated sea wall interesting. The overall results showed that the efficacy of perforated wall is almost similar to solid wall. Hence, it can be efficiently used instead of solid wall. Moreover, overtopped water that is stuck behind the wall is readily gone back to the sea through perforations releasing additional forces on the nearby structures. PMID:24790578
Burns, Ronda L.; Wild, Emily C.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure LINCTH00330044 on Town Highway 33 crossing the New Haven River, Lincoln, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D.The site is in the Green Mountain section of the New England physiographic province in west-central Vermont. The 6.3-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest.In the study area, the New Haven River has an incised, sinuous channel with a slope of approximately 0.02 ft/ft, an average channel top width of 56 ft and an average bank height of 6 ft. The channel bed material ranges from gravel to boulder with a median grain size (D50) of 101.9 mm (0.334 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 10, 1996, indicated that the reach was stable.The Town Highway 33 crossing of the New Haven River is a 33-ft-long, one-lane bridge consisting of one 31-foot timber-beam span (Vermont Agency of Transportation, written communication, December 14, 1995). The opening length of the structure parallel to the bridge face is 29.3 ft. The bridge is supported by vertical, wood-beam crib abutments with wingwalls. The channel is skewed approximately 25 degrees to the opening while the opening-skew-to-roadway is zero degrees.A scour hole 1.0 ft deeper than the mean thalweg depth was observed along the right abutment during the Level I assessment. The scour protection measures at the site included type-1 stone fill (less than 12 inches diameter) at the downstream end of the downstream left wingwall and along the downstream right bank, type-2 stone fill (less than 36 inches diameter) along the upstream right bank and type-3 stone fill (less than 48 inches diameter) at the upstream end of the upstream right wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E.Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows.Contraction scour for all modelled flows ranged from 0.0 to 1.3 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge, which was less than the 100-year discharge. Abutment scour ranged from 9.4 to 12.6 ft. The worst-case abutment scour occurred at the 100-year discharge for the left abutment and at the incipient overtopping discharge for the right abutment. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution.It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Ivanoff, Michael A.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure CAMBTH00460028 on Town Highway 46 crossing the Seymour River, Cambridge, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in northwestern Vermont. The 9.94-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture while the immediate banks have dense woody vegetation. In the study area, the Seymour River has an incised, straight channel with a slope of approximately 0.02 ft/ft, an average channel top width of 81 ft and an average bank height of 5 ft. The channel bed material ranges from gravel to boulder with a median grain size (D50) of 62.0 mm (0.204 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 11, 1995, indicated that the reach was stable. The Town Highway 46 crossing of the Seymour River is a 38-ft-long, one-lane bridge consisting of one 33-foot steel-beam span (Vermont Agency of Transportation, written communication, March 8, 1995). The opening length of the structure parallel to the bridge face is 30.6 ft.The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 5 degrees to the opening while the measured opening-skew-to-roadway is 10 degrees. A scour hole 0.2 ft deeper than the mean thalweg depth was observed along the upstream right wingwall and right abutment during the Level I assessment. The only scour protection measure at the site was type-1 stone fill (less than 12 inches diameter) along the upstream left road embankment. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.8 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge. Left abutment scour ranged from 4.2 to 4.9 ft. The worst-case left abutment scour occurred at the 500-year discharge. Right abutment scour ranged from 8.8 to 9.7 ft. The worst-case right abutment scour occurred at the incipient roadway-overtopping discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Ivanoff, Michael A.; Hammond, Robert E.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure BRNETH00070045 on Town Highway 7 crossing the Stevens River, Barnet, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in east-central Vermont. The 41.5-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest upstream and pasture downstream of the bridge while the immediate banks have dense woody vegetation. In the study area, the Stevens River has an incised, sinuous channel with a slope of approximately 0.02 ft/ft, an average channel top width of 100 ft and an average bank height of 17 ft. The channel bed material ranges from gravel to boulder with a median grain size (D50) of 105 mm (0.344 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 22, 1995, indicated that the reach was stable. The Town Highway 7 crossing of the Stevens River is a 37-ft-long, two-lane bridge consisting of one 34-foot concrete slab span (Vermont Agency of Transportation, written communication, March 16, 1995). The opening length of the structure parallel to the bridge face is 33 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 10 degrees to the opening while the opening-skew-to-roadway is 20 degrees. The only scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) along the entire left and right abutments, upstream and downstream wingwalls, and upstream and downstream banks. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.8 to 5.4 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge, which was greater than the 100-year discharge. Left abutment scour ranged from 21.8 to 28.6 ft. The worst-case left abutment scour occurred at the 500-year discharge. Right abutment scour ranged from 14.6 to 17.4 ft. The worst-case right abutment scour occurred at the incipient roadway-overtopping discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
NASA Astrophysics Data System (ADS)
Wolfs, Vincent; Willems, Patrick
2013-10-01
Many applications in support of water management decisions require hydrodynamic models with limited calculation time, including real time control of river flooding, uncertainty and sensitivity analyses by Monte-Carlo simulations, and long term simulations in support of the statistical analysis of the model simulation results (e.g. flood frequency analysis). Several computationally efficient hydrodynamic models exist, but little attention is given to the modelling of floodplains. This paper presents a methodology that can emulate output from a full hydrodynamic model by predicting one or several levels in a floodplain, together with the flow rate between river and floodplain. The overtopping of the embankment is modelled as an overflow at a weir. Adaptive neuro fuzzy inference systems (ANFIS) are exploited to cope with the varying factors affecting the flow. Different input sets and identification methods are considered in model construction. Because of the dual use of simplified physically based equations and data-driven techniques, the ANFIS consist of very few rules with a low number of input variables. A second calculation scheme can be followed for exceptionally large floods. The obtained nominal emulation model was tested for four floodplains along the river Dender in Belgium. Results show that the obtained models are accurate with low computational cost.
Characterization of crystal structure features of a SIMOX substrate
NASA Astrophysics Data System (ADS)
Eidelman, K. B.; Shcherbachev, K. D.; Tabachkova, N. Yu.; Podgornii, D. A.; Mordkovich, V. N.
2015-12-01
The SIMOX commercial sample (Ibis corp.) was investigated by a high-resolution X-ray diffraction (HRXRD), a high-resolution transmission electron microscopy (HRTEM) and an Auger electron spectroscopy (AES) to determine its actual parameters (the thickness of the top Si and a continuous buried oxide layer (BOX), the crystalline quality of the top Si layer). Under used implantation conditions, the thickness of the top Si and BOX layers was 200 nm and 400 nm correspondingly. XRD intensity distribution near Si(0 0 4) reciprocal lattice point was investigated. According to the oscillation period of the diffraction reflection curve defined thickness of the overtop silicon layer (220 ± 2) nm. HRTEM determined the thickness of the oxide layer (360 nm) and revealed the presence of Si islands with a thickness of 30-40 nm and a length from 30 to 100 nm in the BOX layer nearby "BOX-Si substrate" interface. The Si islands are faceted by (1 1 1) and (0 0 1) faces. No defects were revealed in these islands. The signal from Si, which corresponds to the particles in an amorphous BOX matrix, was revealed by AES in the depth profiles. Amount of Si single crystal phase at the depth, where the particles are deposited, is about 10-20%.
NASA Technical Reports Server (NTRS)
2002-01-01
(Released 18 June 2002) Among the many varied landscapes on Mars the term chaos is applied to those places that have a jumbled, blocky appearance. Most of the better known chaotic terrain occurs in the northern hemisphere but there are other occurrences in the southern hemisphere, three of which are centered on 180 degrees west longitude. Ariadnes Colles, Atlantis, and Gorgonum Chaos all share similar features: relatively bright, irregularly shaped knobs and mesas that rise above a dark, sand-covered, hummocky floor. Close inspection of this THEMIS image shows that the darker material tends to lap up to the base of the knobs and stops where the slopes are steep. On some of the lowest knobs, the dark material appears to overtop them. The knobs themselves are highly eroded, many having a pitted appearance. Images from the camera on Mars Global Surveyor clearly show that the dark material is sand, based on its mantling appearance and the presence of dunes. It looks as though the material that composes the knobs was probably a continuous layer that was subsequently heavily eroded. While it is likely that the dark sand is responsible for some of the erosion it is also possible that the this landscape was eroded by some other process and the sand was emplaced at a later time.
Dynamics and early post-tsunami evolution of floating marine debris near Fukushima Daiichi
NASA Astrophysics Data System (ADS)
Matthews, John Philip; Ostrovsky, Lev; Yoshikawa, Yutaka; Komori, Satoru; Tamura, Hitoshi
2017-08-01
The devastating tsunami triggered by the Tōhoku-Oki earthquake of 11 March 2011 caused a crisis at the Fukushima Daiichi nuclear power station where it overtopped the seawall defences. On retreating, the tsunami carried loose debris and wreckage seaward and marshalled buoyant material into extensive plumes. Widespread concern over the fate of these and numerous other Tōhoku tsunami depositions prompted attempts to simulate debris dispersion throughout the wider Pacific. However, the effects of locally perturbed wind and wave fields, active Langmuir circulation and current-induced attrition determine a complex and poorly understood morphology for large floating agglomerations. Here we show that the early post-tsunami evolution of marine-debris plumes near Fukushima Daiichi was also shaped by near-surface wind modifications that took place above relatively calm (lower surface roughness) waters covered by surface films derived from oil and other contaminants. High-spatial-resolution satellite tracking reveals faster-than-expected floating-debris motions and invigorated plume evolution within these regions, while numerical modelling of turbulent air flow over the low-drag, film-covered surface predicts typically metre-per-second wind strengthening at centimetric heights, sufficient to explain the observed debris-speed increases. Wind restructuring probably stimulates the dispersion of flotsam from both biological and anthropogenic sources throughout a global ocean of highly variable surface roughness.
Erosion and sedimentation during the September 2015 flooding of the Kinu River, central Japan
Dan Matsumoto; Sawai, Yuki; Yamada, Masaki; Namegaya, Yuichi; Shinozaki, Tetsuya; Takeda, Daisuke; Fujino, Shigehiro; Tanigawa, Koichiro; Nakamura, Atsunori; Pilarczyk, Jessica E.
2016-01-01
Erosional and sedimentary features associated with flooding have been documented in both modern and past cases. However, only a few studies have demonstrated the relationship between these features and the corresponding hydraulic conditions that produced them, making it difficult to evaluate the magnitude of paleo-flooding. This study describes the characteristics associated with inundation depth and flow direction, as well as the erosional and sedimentary features resulting from the disastrous flooding of the Kinu River, central Japan, in September 2015. Water levels rose rapidly due to heavy rainfall that eventually overtopped, and subsequently breached, a levee in Joso City, causing destructive flooding on the surrounding floodplain. Distinctive erosional features are found next to the breached levee, while depositional features, such as a sandy crevasse-splay deposit are found further away from the breach. The deposit can be divided into three units based on sedimentary facies. The vertical and lateral changes of these sedimentary facies may be the result of temporal and spatial changes associated with flow during the single flooding event. These observations and quantitative data provide information that can be used to reveal the paleohydrology of flood deposits in the stratigraphic record, leading to improved mitigation of future flooding disasters. PMID:27677769
Variability In Long-Wave Runup as a Function of Nearshore Bathymetric Features
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dunkin, Lauren McNeill
Beaches and barrier islands are vulnerable to extreme storm events, such as hurricanes, that can cause severe erosion and overwash to the system. Having dunes and a wide beach in front of coastal infrastructure can provide protection during a storm, but the influence that nearshore bathymetric features have in protecting the beach and barrier island system is not completely understood. The spatial variation in nearshore features, such as sand bars and beach cusps, can alter nearshore hydrodynamics, including wave setup and runup. The influence of bathymetric features on long-wave runup can be used in evaluating the vulnerability of coastal regionsmore » to erosion and dune overtopping, evaluating the changing morphology, and implementing plans to protect infrastructure. In this thesis, long-wave runup variation due to changing bathymetric features as determined with the numerical model XBeach is quantified (eXtreme Beach behavior model). Wave heights are analyzed to determine the energy through the surfzone. XBeach assumes that coastal erosion at the land-sea interface is dominated by bound long-wave processes. Several hydrodynamic conditions are used to force the numerical model. The XBeach simulation results suggest that bathymetric irregularity induces significant changes in the extreme long-wave runup at the beach and the energy indicator through the surfzone.« less
NASA Astrophysics Data System (ADS)
LaBrecque, Taylor S.; Kaufman, Darrell S.
2016-01-01
Physical and biological characteristics of lacustrine sediment from Emerald Lake were used to reconstruct the Holocene glacier history of Grewingk Glacier, southern Alaska. Emerald Lake is an ice-marginal threshold lake, receiving glaciofluvial sediment when Grewingk Glacier overtops the topographic divide that separates it from the lake. Sub-bottom acoustical profiles were used to locate core sites to maximize both the length and resolution of the sedimentary sequence recovered in the 4-m-long cores. The age model for the composite sequence is based on 13 14C ages and a 210Pb profile. A sharp transition from the basal inorganic mud to organic-rich mud at 11.4 ± 0.2 ka marks the initial retreat of Grewingk Glacier below the divide of Emerald Lake. The overlaying organic-rich mud is interrupted by stony mud that records a re-advance between 10.7 ± 0.2 and 9.8 ± 0.2 ka. The glacier did not spill meltwater into the lake again until the Little Ice Age, consistent with previously documented Little Ice Ages advances on the Kenai Peninsula. The retreat of Grewingk Glacier at 11.4 ka took place as temperature increased following the Younger Dryas, and the subsequent re-advance corresponds with a climate reversal beginning around 11 ka across southern Alaska.
Competition from below for light and nutrients shifts productivity among tropical species.
Ewel, John J; Mazzarino, María Julia
2008-12-02
Chance events such as seed dispersal determine the potential composition of plant communities, but the eventual assemblage is determined in large part by subsequent interactions among species. Postcolonization sorting also affects the ultimate composition of communities assembled by people for restoration, horticulture, or conservation. Thus, knowledge of the mechanisms controlling interspecific interactions in plant communities is important for explaining patterns observed in nature and predicting success or failure of utilitarian combinations. Relationships among species, especially those from studies of biological diversity and ecosystem functioning, are largely based on studies of short-lived, temperate-zone plants. Extrapolation to perennial plants in the humid tropics is risky because functional relationships among large-stature species change with time. Shifts in competitive relationships among 3 life forms--trees, palms, and perennial herbs--occurred during 13 yr in experimental tropical ecosystems. In 2 cases the novel competitive mechanism responsible for the shift was reduction in crown volume, and therefore light-capturing capability, of overtopping deciduous trees by intrusive growth from below a palm. In a third case, complementary resource use developed between 2 evergreen life forms (overstory tree and palm), probably because of differential nutrient acquisition. Species-level traits and adequate time for shifts in interspecific relationships to emerge are crucial for predicting community trajectories.
Variable primary producer responses to nutrient and ...
Mesocosm experiments have been used to evaluate the impacts of nutrient loading on estuarine plant communities in order to develop nutrient response relationships. Mesocosm eutrophication studies tend to focus on long residence time systems. In the Pacific Northwest, many estuaries have high nutrient loads, short water residence times, seasonal macroalgal blooms, while intertidal seagrass meadows persist under what appear to be largely naturally-derived eutrophic conditions. Using experimental mesocosms, we examined how primary producer communities in rapidly flushed systems respond to a range of temperature (10 and 20 °C) and nutrient loads (ambient, 1.5, 3 and 6 x ambient). Thermal and nutrient loading regimes were maintained for three sets of 3 week-duration experiments during the summer of 2013. Statistical analysis was performed using an information criterion approach to evaluate the best fit model. Green macroalgal (GMA) growth and tissue N increased in response to nutrient loading. Irrespective of nutrient load, GMA at 10 °C remained intercalated among seagrass shoots, but at 20 °C formed floating mats that overtopped seagrass. Outgassing of O2 in combination with photosynthetic O2 production likely induced floating mat formation. No phytoplankton blooms were observed. Zostera japonica leaf biomass and C:N responded to temperature while other metrics exhibited no statistically significant difference. Z. marina growth, wasting disease, and morphological
The storm and flood of September 15, 1989, in Fayetteville, North Carolina
Mason, R.R.; Caldwell, W.S.
1992-01-01
The storm of September 15, 1989, in and around the city of Fayetteville, North Carolina, produced the most extensive flooding of Fayetteville since 1945. The flood inundated 925 acres in the city along Cross Creek and Blounts Creek and their tributaries, flooded 338 buildings, caused damages in excess of $10 million and claimed the lives of 2 small children. Twenty-two roads and five dams were overtopped, and three earthen dams failed. Recorded rainfall and streamflow data indicate that the storm and flood were relatively rare events. Recorded rainfall totals for durations of less than 2 hours were not exceptionally rare or unusual, but rainfall totals for 2-, 3-, and 6-hr durations recorded at a National Weather Service rain gage substantially exceeded 100-yr rainfall amounts by approximately 31, 28, and 12%, respectively. Recorded unit-peak discharges ranged from 33 to 6,060 cu ft/sec/sq mi (the latter downstream from a dam failure). Peak discharges at 6 of 10 stream-gaging sites had recurrence intervals greater than 100 yrs. Flooding of Cross Creek and Blounts Creek upstream of Robeson Street was generally less extensive than the 100-yr flood, as delineated by the Federal Emergency Management Agency. Downstream of Robeson Street, the flooding was more extensive.
Olson, S.A.; Ayotte, J.D.
1997-01-01
Contraction scour for all modelled flows ranged from 0.0 to 2.5 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge, which was less than the 100-year discharge. The contraction scour depths do not take the concrete channel bed under the bridge into account. Abutment scour ranged from 8.7 to 18.2 ft. The worstcase abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scouredstreambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particlesize distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Wave energy extraction by coupled resonant absorbers.
Evans, D V; Porter, R
2012-01-28
In this article, a range of problems and theories will be introduced that will build towards a new wave energy converter (WEC) concept, with the acronym 'ROTA' standing for resonant over-topping absorber. First, classical results for wave power absorption for WECs constrained to operate in a single degree of freedom will be reviewed and the role of resonance in their operation highlighted. Emphasis will then be placed on how the introduction of further resonances can improve power take-off characteristics by extending the range of frequencies over which the efficiency is close to a theoretical maximum. Methods for doing this in different types of WECs will be demonstrated. Coupled resonant absorbers achieve this by connecting a WEC device equipped with its own resonance (determined from a hydrodynamic analysis) to a new system having separate mass/spring/damper characteristics. It is shown that a coupled resonant effect can be realized by inserting a water tank into a WEC, and this idea forms the basis of the ROTA device. In essence, the idea is to exploit the coupling between the natural sloshing frequencies of the water in the internal tank and the natural resonance of a submerged buoyant circular cylinder device that is tethered to the sea floor, allowing a rotary motion about its axis of attachment.
Dealing with uncertainty in the probability of overtopping of a flood mitigation dam
NASA Astrophysics Data System (ADS)
Michailidi, Eleni Maria; Bacchi, Baldassare
2017-05-01
In recent years, copula multivariate functions were used to model, probabilistically, the most important variables of flood events: discharge peak, flood volume and duration. However, in most of the cases, the sampling uncertainty, from which small-sized samples suffer, is neglected. In this paper, considering a real reservoir controlled by a dam as a case study, we apply a structure-based approach to estimate the probability of reaching specific reservoir levels, taking into account the key components of an event (flood peak, volume, hydrograph shape) and of the reservoir (rating curve, volume-water depth relation). Additionally, we improve information about the peaks from historical data and reports through a Bayesian framework, allowing the incorporation of supplementary knowledge from different sources and its associated error. As it is seen here, the extra information can result in a very different inferred parameter set and consequently this is reflected as a strong variability of the reservoir level, associated with a given return period. Most importantly, the sampling uncertainty is accounted for in both cases (single-site and multi-site with historical information scenarios), and Monte Carlo confidence intervals for the maximum water level are calculated. It is shown that water levels of specific return periods in a lot of cases overlap, thus making risk assessment, without providing confidence intervals, deceiving.
Boehmler, Erick M.; Burns, Ronda L.
1997-01-01
Contraction scour for all modelled flows ranged from 0.0 to 1.4 feet. The worst-case contraction scour occurred at the incipient-overtopping discharge of 1730 cubic feet per second, which was less than the 100-year discharge. Abutment scour ranged from 7.6 to 11.4 feet. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Burns, R.L.; Medalie, Laura
1998-01-01
Contraction scour for all modelled flows ranged from 0.0 to 2.1 ft. The worst-case contraction scour occurred at the 500-year discharge. Left abutment scour ranged from 6.7 to 8.7 ft. The worst-case left abutment scour occurred at the incipient roadway-overtopping discharge. Right abutment scour ranged from 7.8 to 9.5 ft. The worst-case right abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A crosssection of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and Davis, 1995, p. 46). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Księżopolska-Orłowska, Krystyna; Pacholec, Anna; Jędryka-Góral, Anna; Bugajska, Joanna; Sadura-Sieklucka, Teresa; Kowalik, Katarzyna; Pawłowska-Cyprysiak, Karolina; Łastowiecka-Moras, Elżbieta
2016-01-01
Rehabilitation slows the progress of rheumatoid arthritis (RA) and prevents progression of disability. This study aimed to compare the impact of two rehabilitation programmes on pain, disease activity, locomotor function, global health and work ability forecast in RA patients. Sixty-four employed women aged 24-65 years participated in the study. All patients underwent individual and instrumental kinesiotherapy. Thirty-two patients underwent cryogenic chamber therapy and local cryotherapy as well as non-weight-bearing, instrumental and individual kinesiotherapy. The remaining 32 patients received traditional rehabilitation in the form of electromagnetic and instrumental therapy, individual and pool-based non-weight-bearing kinesiotherapy. Rehabilitation lasted 3 weeks. Patients were examined three times: prior to rehabilitation, after 3 weeks of therapy and 3 months after completion of rehabilitation. The following study instruments were used: to assess disease activity: DAS-28; functional impairment: HAQ-DI; pain severity: VAS; patients' overall well-being: a scale from 0 to 100 (Global Health Index); and patients' own prognosis of fitness for work: the 6th question from Work Ability Index (WAI). Statistical analysis of data was performed using the STATISTICA 8.0 package. Mixed-design two-way analysis of variance was used for hypothesis testing. All patients improved after rehabilitation. The group of patients those who underwent cryotherapy had improved DAS-28, HAQ-DI, VAS and global health scores immediately following the 3-week rehabilitation programme (p < 0.001, p = 0.001, p = 0.007 and p < 0.001, respectively), as well as at the 3-month follow-up (p < 0.001, p < 0.001, p = 0.009 and p < 0.001, respectively). Rehabilitation using cryotherapy resulted in greater improvement in disease activity DAS-28 [F(2,105) = 5.700; p = 0.007; η(2) = 0.084] and HAQ-DI locomotor function scores [F(2,109) = 6.771; p = 0.003; η(2) = 0.098] compared to traditional rehabilitation. The impact of both forms of rehabilitation on patients' own prognosis of work ability in the next 2 years was not significant. Results of patients who underwent traditional approach showed decreased disease activity following the initial 3-week period; however, this improvement did not sustain to the end of follow-up, 3 months later. Complex rehabilitation in RA has a positive effect on patients' clinical condition. The rehabilitation programme that includes cryotherapy overtops traditional rehabilitation, particularly as regards improvement in locomotor function, disease activity and sustaining willingness to continue working and exerts long-lasting effect. Rehabilitation using cryotherapy is more effective in improving locomotor function, decreasing disease activity and sustaining willingness to continue working compared to traditional rehabilitation. Rehabilitation using cryotherapy significantly reduces the intensity of pain experienced by patients with RA, and this positive effect is maintained at 3 months post-rehabilitation. Complex rehabilitation, particularly treatment using cryotherapy, improves patients' subjective assessment of their overall well-being and perception of their disease. Complex rehabilitation in rheumatoid arthritis has a positive effect on patients' clinical condition.
Physical Hydraulic Model of Side-Channel Spillway of Lambuk DAM, Bali
NASA Astrophysics Data System (ADS)
Harifa, A. C.; Sholichin, M.; Othman, F. B.
2013-12-01
The spillway is among the most important structures of a dam project. A spillway is designed to prevent overtopping of a dam at a place that is not designed for overtopping. Side-channel spillways are commonly used to release water flow from a reservoir in places where the sides are steep and have a considerable height above the dam. Experimental results were collected with a hydraulic model of the side-channel spillway for releasing the peak overflow of Lambuk Dam. This dam is, located on the Lambuk River, which is a tributary of the Yeh Hoo River ~ 34.6 km north of Denpasar on the island of Bali. The bituminous geomembrane faced dam is 24 m in height, with a 35-m wide spillway. The length of the side channel is 35 m long, with 58 m of transition channel, 67.37 m of chuteway channel and 22.71 m of stilling basin. The capacity of the spillway is 231.91 m3/s and the outlet works capacity is 165.28 m3/s. The reservoir is designed for irrigation and water supply. The purpose of this study was to optimize the designed of the structure and to ensure its safe operation. In hydraulic model may help the decision-makers to visualize the flow field before selecting a ';suitable' design. The hydraulic model study was performed to ensure passage of the maximum discharge at maximum reservoir capacity; to study the spillway approach conditions, water surface profiles, and flow patterns in the chuteway; and to reveal potential demerits of the proposed hydraulic design of various structures and explore solutions. The model was constructed at 1 : 40 scale, Reservoir topography was modeled using concrete, the river bed using sand and some gravel, the river berm using concrete, and the spillway and channel using Plexiglas. Water was measured using Rectangular contracted weir. Design floods (with return period in year) were Q2 = 111.40 m3/s, Q5 = 136.84 m3/s, Q10 = 159.32 m3/s, Q25 = 174.61 m3/s, Q50 = 185.13 m3/s, Q100 = 198.08 m3/s, Q200 = 210.55 m3/s, Q1000 = 231.91 m3/s and the probable maximum flood was 476.88 m3/s. Hydraulic analysis of spillway used USBR method for spillway, Hind's equation for the side channel, energy equation with standard step method for the transition and chuteway channel. Local scouring depth was calculated using the Schotlisch and Veronise equation. Total head on crest spillway for Q2 = 0.92 m, Q1000 = 1.68 m and for QPMF = 1.92 m. The highest measurement error is 3.16% according to the total head on crest spillway. Cavitation was observed in chuteway. Flow is subcritical (Froude < 1) in the side channel and supercritical in the transition channel. The final design for the spillway and chuteway were safe from impact of cavitation, pulsating flow, and local scouring.
Wild, Emily C.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure WOLCTH00150005 on Town Highway 15 crossing the Wild Branch Lamoille River, Wolcott, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D.During the August 1995 and July 1997 flood events, the left roadway was overtopped. Although there was loss of stone fill along the right abutment, the structure withstood both events.The site is in the Green Mountain section of the New England physiographic province in north- central Vermont. The 38.3-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture upstream and downstream of the bridge, while the immediate banks have dense woody vegetation.In the study area, the Wild Branch Lamoille River has an incised, sinuous channel with a slope of approximately 0.006 ft/ft, an average channel top width of 98 ft and an average bank height of 5 ft. The channel bed material ranges from gravel to bedrock with a median grain size (D50) of 89.1 mm (0.292 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 17, 1996, indicated that the reach was stable.The Town Highway 15 crossing of the Wild Branch Lamoille River is a 46-ft-long, two-lane bridge consisting of a 43-foot prestressed concrete box-beam span (Vermont Agency of Transportation, written communication, October 13, 1995). The opening length of the structure parallel to the bridge face is 42 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 10 degrees to the opening while the opening- skew-to-roadway is zero degrees.A scour hole 2.0 ft deeper than the mean thalweg depth was observed near the bridge along the left side of the channel during the Level I assessment. Scour countermeasures at the site consists of type-1 stone fill (less than 12 inches diameter) along the upstream left bank and along the left and right downstream banks, type-2 stone fill (less than 36 inches diameter) along the downstream left and right wingwalls, type-3 stone fill (less than 48 inches diameter) along the upstream left wingwall and the right abutment, and type-4 stone fill (less than 60 inches diameter) along the upstream right wingwall and the left abutment. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E.Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge was determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows.Contraction scour for all modelled flows was zero ft. Left abutment scour ranged from 7.9 to 23.3 ft. The worst-case left abutment scour occurred at the 500-year discharge. Right abutment scour ranged from 21.5 to 22.8 ft. The worst-case right abutment scour occurred at the incipient roadway-overtopping discharge. Additional in formation on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross- section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution.It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Ivanoff, Michael A.; Hammond, Robert E.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure WALDTH00060023 on Town Highway 6 crossing Stannard Brook, Walden, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in eastern Vermont. The 5.61-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the upstream surface cover is shrub and brushland with some trees. The downstream surface cover is forest. In the study area, Stannard Brook has an incised, straight channel with a slope of approximately 0.02 ft/ft, an average channel top width of 54 ft and an average bank height of 9 ft. The channel bed material ranges from gravel to boulder with a median grain size (D50) of 64.0 mm (0.210 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 8, 1995, indicated that the reach was stable. The Town Highway 6 crossing of Stannard Brook is a 59-ft-long (bottom width), two-lane pipe arch culvert consisting of one 22-foot corrugated plate pipe arch span (Vermont Agency of Transportation, written communication, March 28, 1995). The opening length of the structure parallel to the bridge face is 21.9 ft.The pipe arch is supported by vertical, concrete kneewalls. The channel is skewed approximately 10 degrees to the opening while the opening-skew-to-roadway is zero degrees. A scour hole 1.5 ft deeper than the mean thalweg depth was observed along the upstream end of the right kneewall during the Level I assessment. There was also a scour hole 0.5 ft deeper than the mean thalweg depth observed along the downstream end of the left kneewall. The scour counter measures at the site included type-3 stone fill (less than 48 inches diameter) at the upstream and downstream end of the left and right kneewall. There was also type-2 stone fill (less than 36 inches diameter) along the upstream right bank. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and kneewalls). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 2.3 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge, which was greater than the 100-year discharge. Left kneewall scour ranged from 11.7 to 16.8 ft. The worst-case left kneewall scour occurred at the 500-year discharge. Right kneewall scour ranged from 13.7 to 16.7 ft. The worst-case right kneewall scour occurred at the incipient roadway-overtopping discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. During the Level I survey ledge was discovered at the upstream end of the right abutment. The ledge in the channel may limit scour depths. It is generally accepted that the Froehlich equation (abutment/ kneewall scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Quantifying relief on alluvial fans using airborne lidar to reveal patterns of sediment accumulation
NASA Astrophysics Data System (ADS)
Morelan, A. E., III; Oskin, M. E.
2017-12-01
We present a method of quantifying detailed surface relief on alluvial fans from high-resolution topography. Average slope and curvature of the fan are used together to empirically derive an idealized, radially symmetric fan surface, from which we compute residual topography. Maps produced using this technique highlight spatial patterns of fan deposition and avulsion. Regions of high residual topography reveal active and abandoned sediment lobes accumulated from recent depositional events, often with well-defined channels at their apex. Preliminary observations suggest that surface relief is uniform across a collection of fans in a given region and source lithology. Alluvial fans with granitic catchment lithologies in eastern California (n=12), each with varying source catchment size and mean fan slope, all show relief of around 4 meters. A collection of fans from the Carrizo Plain in central California (n=12), with source catchments set within Miocene marine and nonmarine sedimentary rocks, show significantly lower relief values around 2 meters. We hypothesize that particle grain size determines this contrasting relief through its control on the thickness of fan-building debris flows. In both settings we find that sediment lobes tend to extend toward the fan toe. This pattern supports a process, observed in analog experiments, of fan deposition dominated by back-filling and overtopping of distributary channels by debris-flows.
Xiao, Han; Wang, Dingbao; Medeiros, Stephen C; Hagen, Scott C; Hall, Carlton R
2018-07-15
Saltwater intrusion (SWI) into root zone in low-lying coastal areas can affect the survival and spatial distribution of various vegetation species by altering plant communities and the wildlife habitats they support. In this study, a baseline model was developed based on FEMWATER to simulate the monthly variation of root zone salinity of a geo-typical area located at the Cape Canaveral Barrier Island Complex (CCBIC) of coastal east-central Florida (USA) in 2010. Based on the developed and calibrated baseline model, three diagnostic FEMWATER models were developed to predict the extent of SWI into root zone by modifying the boundary values representing the rising sea level based on various sea-level rise (SLR) scenarios projected for 2080. The simulation results indicated that the extent of SWI would be insignificant if SLR is either low (23.4cm) or intermediate (59.0cm), but would be significant if SLR is high (119.5cm) in that infiltration/diffusion of overtopping seawater in coastal low-lying areas can greatly increase root zone salinity level, since the sand dunes may fail to prevent the landward migration of seawater because the waves of the rising sea level can reach and pass over the crest under high (119.5cm) SLR scenario. Copyright © 2018 Elsevier B.V. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Berisford, Yvette, C.; Bush, Parshall, B.; Taylor, John, W.
Kudzu is an exotic vine that threatens forests in the southeastern United States. It can climb, overtop, and subsequently kill new seedlings or mature trees. Herbicides are commonly used to control kudzu; however, eradication might require retreatment for 3 to 10 yr in young stands and 7 to 10 yr for mature stands. Clopyralid, picloram, triclopyr, metsulfuron, and tebuthiuron exert various degrees of control, depending on soil type, meteorological conditions, herbicide formulation, seasonal application, characteristics of the kudzu stand, and frequency and number of herbicide. Field residue data for soil or leachate are lacking for all of these herbicides whenmore » they are used in actual forest regeneration programs in the Coastal Plain. These data are needed to assess the relative potential for the herbicides to leach into groundwater or to move off-site into sensitive ecological areas of the Coastal Plain in which sandy soils predominate and the groundwater tends to be shallow. As part of an integrated pest management program to control kudzu on forest regeneration areas at the Savannah River Site near New Ellenton, SC, five herbicides were evaluated from the standpoints of herbicide leaching, kudzu control, and plant community development. Three herbicide chemical families were represented. This included pyridinecarboxylic acid herbicides (clopyralid, picloram 1 2,4-D, and triclopyr), a sulfonylurea herbicide (metsulfuron), and a substituted urea herbicide (tebuthiuron).« less
Risk Analysis of Extreme Rainfall Effects on the Shihmen Reservoir
NASA Astrophysics Data System (ADS)
Ho, Y.; Lien, W.; Tung, C.
2009-12-01
Typhoon Morakot intruded Taiwan during 7th and 8th of August 2009, brought about 2,700 mm of total rainfall which caused serious flood and debris to the southern region of Taiwan. One of the serious flooded areas is in the downstream of Zengwen reservoir. People believed that the large amount of floodwater released from Zengwen reservoir led to the severe inundation. Therefore, the Shihmen reservoir is one of the important reservoirs in northern Taiwan. The Taipei metropolis, which is in downstream of Shihmen reservoir, is the political and economical center of Taiwan. If heavy rainfall as those brought by Typhoon Marakot falls in the Shihmen reservoir watershed, it may create a bigger disaster. This study focused on the impacts of a typhoon, like Morakot, in Shihmen reservoir. The hydrological model is used to simulate the reservoir inflows under different rainfall conditions. The reservoir water balance model is developed to calculate reservoir’s storage and outflows under the inflows and operational rules. The ability of flood mitigation is also evaluated. Besides, the released floodwater from reservoir and the inflows from different tributaries are used to determine whether or not the river stage will overtop levee. Also, the maximum released floodwater and other inflows which could lead to damages will be stated. Lastly, the criteria of rainfall conditions and initial stages of reservoir will be analyzed in this study.
Flood Forecasting in Wales: Challenges and Solutions
NASA Astrophysics Data System (ADS)
How, Andrew; Williams, Christopher
2015-04-01
With steep, fast-responding river catchments, exposed coastal reaches with large tidal ranges and large population densities in some of the most at-risk areas; flood forecasting in Wales presents many varied challenges. Utilising advances in computing power and learning from best practice within the United Kingdom and abroad have seen significant improvements in recent years - however, many challenges still remain. Developments in computing and increased processing power comes with a significant price tag; greater numbers of data sources and ensemble feeds brings a better understanding of uncertainty but the wealth of data needs careful management to ensure a clear message of risk is disseminated; new modelling techniques utilise better and faster computation, but lack the history of record and experience gained from the continued use of more established forecasting models. As a flood forecasting team we work to develop coastal and fluvial forecasting models, set them up for operational use and manage the duty role that runs the models in real time. An overview of our current operational flood forecasting system will be presented, along with a discussion on some of the solutions we have in place to address the challenges we face. These include: • real-time updating of fluvial models • rainfall forecasting verification • ensemble forecast data • longer range forecast data • contingency models • offshore to nearshore wave transformation • calculation of wave overtopping
National Levee Database: monitoring, vulnerability assessment and management in Italy
NASA Astrophysics Data System (ADS)
Barbetta, Silvia; Camici, Stefania; Maccioni, Pamela; Moramarco, Tommaso
2015-04-01
A properly designed and constructed levees system can often be an effective device for repelling floodwaters and provide barriers against inundation to protect urbanized and industrial areas. However, the delineation of flooding-prone areas and the related hydraulic hazard mapping taking account of uncertainty (Apel et al., 2008) are usually developed with a scarce consideration of the possible occurrence of levee failures along river channels (Mazzoleni et al., 2014). Indeed, it is well known that flooding is frequently the result of levee failures that can be triggered by several factors, as: (1) overtopping, (2) scouring of the foundation, (3) seepage/piping of levee body/foundation, and (4) sliding of the foundation. Among these failure mechanisms that are influenced by the levee's geometrical configuration, hydraulic conditions (e.g. river level and seepage), and material properties (e.g. permeability, cohesion, porosity, compaction), the piping caused by seepage (ICOLD, http://www.icold-cigb.org) is considered one of the most dominant levee failure mechanisms (Colleselli F., 1994; Wallingford H. R., 2003). The difficulty of estimating the hydraulic parameters to properly describe the seepage line within the body and foundation of the levee implies that the study of the critical flood wave routing is typically carried out by assuming that the levee system is undamaged during the flood event. In this context, implementing and making operational a National Levee Database (NLD), effectively structured and continuously updated, becomes fundamental to have a searchable inventory of information about levees available as a key resource supporting decisions and actions affecting levee safety. The ItaliaN LEvee Database (INLED) has been recently developed by the Research Institute for Geo-Hydrological Protection (IRPI) for the Civil Protection Department of the Presidency of Council of Ministers. INLED has the main focus of collecting comprehensive information about Italian levees and historical breach failures to be exploited in the framework of an operational procedure addressed to the seepage vulnerability assessment of river reaches where the levee system is an important structural measure against flooding. For its structure, INLED is a dynamic geospatial database with ongoing efforts to add levee data from authorities with the charge of hydraulic risk mitigation. In particular, the database is aimed to provide the available information about: i) location and condition of levees; ii) morphological and geometrical properties; iii) photographic documentation; iv) historical levee failures; v) assessment of vulnerability to overtopping and seepage carried out through a procedure based on simple vulnerability indexes (Camici et al. 2014); vi) management, control and maintenance; vii)flood hazard maps developed by assuming the levee system undamaged/damaged during the flood event. Currently, INLED contains data of levees that are mostly located in the Tiber basin, Central Italy. References Apel H., Merz B. & Thieken A.H. Quantification of uncertainties in flood risk assessments. Int J River Basin Manag 2008, 6, (2), 149-162. Camici S,, Barbetta S., Moramarco T., Levee body vulnerability to seepage: the case study of the levee failure along the Foenna stream on 1st January 2006 (central Italy)", Journal of Flood Risk Management, in press. Colleselli F. Geotechnical problems related to river and channel embankments. Rotterdam, the Netherlands: Springer, 1994. H. R.Wallingford Consultants (HRWC). Risk assessment for flood and coastal defence for strategic planning: high level methodology technical report, London, 2003. Mazzoleni M., Bacchi B., Barontini S., Di Baldassarre G., Pilotti M. & Ranzi R. Flooding hazard mapping in floodplain areas affected by piping breaches in the Po River, Italy. J Hydrol Eng 2014, 19, (4), 717-731.
NASA Astrophysics Data System (ADS)
McFall, Brian C.; Mohammed, Fahad; Fritz, Hermann M.
2013-04-01
The Vajont river is an affluent of the Piave River located in the Dolomite Alps of the Veneto Region, about 100km north of Venice. A 265.5 m high double curved arch dam was built across a V-shaped gorge creating a reservoir with a maximum storage capacity of 0.169 km3. A maximum water depth of 250 m was reached by early September 1963 during the third filling attempt of the reservoir, but as creeping on the southern flank increased the third reservoir draw down was initiated. By October 9, 1963 the water depth was lowered to 240m as the southern flank of Vajont reservoir catastrophically collapsed on a length of more than 2km. Collapse occurred during reservoir drawdown in a final attempt to reduce flank creeping and the reservoir was only about two-thirds full. The partially submerged rockslide with a volume of 0.24 km3 penetrated into the reservoir at velocities up to 30 m/s. The wave runup in direct prolongation of slide axis reached the lowest houses of Casso 270m above reservoir level before impact corresponding to 245m above dam crest (Müller, 1964). The rockslide deposit came within 50m of the left abutment and towers up to 140m above the dam crest. The lateral spreading of the surge overtopped the dam crest by more than 100m. The thin arch dam withstood the overtopping and sustained no damage to the structural shell and the abutments. The flood wave dropped more than 500m down the Vajont gorge and into the Piave Valley causing utter destruction to the villages of Longarone, Pirago, Villanova, Rivalta and Fae. More than 2000 persons perished. The Vajont disaster highlights an extreme landslide tsunami event in the narrowly confined water body of a reservoir. Landslide tsunami hazards exist even in areas not exposed to tectonic tsunamis. Source and runup scenarios based on real world events are physically modeled in the three dimensional NEES tsunami wave basin (TWB) at Oregon State University (OSU). A novel pneumatic landslide tsunami generator (LTG) was deployed to simulate landslides with varying geometry and kinematics. The LTG consists of a sliding box filled with up to 1,350 kg of naturally rounded river gravel which is accelerated by means of four pneumatic pistons down the 2H: 1V slope, launching the granular landslide towards the water at velocities of up to 5 m/s. Topographical and bathymetric features can greatly affect wave characteristics and runup heights. Landslide tsunamis are studied in different topographic and bathymetric configurations: far field propagation and runup, a narrow fjord and curved headland configurations, and a conical island setting representing landslides off an island or a volcanic flank collapse. Water surface elevations were measured using an array of resistance wave gauges. The granulate landslide shape and front velocity were measured using above and underwater cameras. Three-dimensional landslide surfaces with surface velocities were reconstruction using a stereo particle image velocimetry (PIV) setup. The speckled pattern on the surface of the granular landslide allows for cross-correlation based PIV analysis. Wave runup was measured with resistance wave gauges along the slope and verified with video image processing. The measured landslide and tsunami data serve to validate and advance 3-dimensional numerical landslide tsunami and prediction models.
NASA Astrophysics Data System (ADS)
Bunte, K.; Swingle, K. W.; Abt, S. R.; Cenderelli, D.
2012-12-01
Effective discharge (Qeff) is defined as the flow at which the product of flow frequency and bedload transport rates obtains its maximum. Qeff is often reported to correspond with bankfull flow (Qbf), where Qeff approximates the 1.5 year recurrence interval flow (Q1.5). Because it transports the majority of all bedload, Qeff is considered a design flow for stream restoration and flow management. This study investigates the relationship between Qeff and Q1.5 for gravel bedload in high elevation Rocky Mountain streams. Both the flow frequency distribution (FQ = a × Qbin-b) where Qbin is the flow class, and the bedload transport rating curve (QB = c × Qd) can be described by power functions. The product FQ × QB = (a × c × Q(-b + d)) is positive if d + -b >0, and negative if d + -b <0. FQ × QB can only attain a maximum (=Qeff) if either FQ or QB exhibit an inflection point. In snowmelt regimes, low flows prevail for much of the year, while high flows are limited to a few days, and extreme floods are rare. In log-log plotting scale, this distribution causes the longterm flow frequency function FQ to steepen in the vicinity of Q1.5. If the bedload rating curve exponent is small, e.g., = 3 as is typical of Helley-Smith bedload samples, d + -b shifts from >0 to <0, causing FQ × QB to peak, and Qeff to be around Q1.5. For measurements thought to be more representative of actual gravel transport obtained using bedload traps and similar devices, large rating curve exponents d of 6 - 16 are typical. In this case, d + -b remains >0, and FQ × QB reaches its maximum near the largest flow on record (Qeff,BT = Qmax). Expression of FQ by negative exponential functions FQ = k × e(Qbin×-m) smooths the product function FQ × QB that displays its maximum as a gentle hump rather than a sharp peak, but without drastically altering Qeff. However, a smooth function FQ × QB allows Qeff to react to small changes in rating curve exponents d. As d increases from <1 to >10, Qeff increases from Qmin to Qmax. The S-shaped relationship of Qeff vs. d shows that changes in d between about 4 and 8 exert the largest influence on Qeff. Not only FQ, but also QB may change its steepness. QB may flatten during floods as flows overtop banks. Many high elevation Rocky Mountain streams are entrenched due to floodplain buildup (overbank deposition and beaver activity) and downcutting. Preliminary flow modeling suggests that bank overtopping starts when Q1.5 >150%, and flows are fully out-of-bank past 200-250% Q1.5. A flattening of the bedload rating curve shifts Qeff from Qmax to within 150-250% Q1.5. Study results suggest that Qeff likely occurs within 150-250% Q1.5, and the often-quoted similarity of Qeff and Qbf (assuming Qbf = Q1.5) does not hold for the study streams, but is rather an artifact of using a Helley-Smith sampler that produces low rating curve exponents near 3. This finding calls into question the utility of Q1.5 or "bankfull flow" as a morphological design flow in high elevation Rocky Mountain streams.
Terrestrial laser scanning of anthropogenic beach berms for urban flood defense
NASA Astrophysics Data System (ADS)
Sanders, B. F.; Schubert, J.; Gallien, T.; Shakeri Majd, M.
2013-12-01
Globally, over 20 million people reside below present high tide levels and as many as 200 million are vulnerable to flooding during extreme events. In California, coastal flooding is driven by a combination of factors such as high astronomical tides, waves, storm surge, and other fluctuations such as those caused by the El Nino Southern Oscillation (ENSO), and climate change is likely to exacerbate those factors testing the limits of coastal flood defenses. Beaches provide natural flood protection during storms by mitigating the effects of high water levels and wave runup, and a process known as beach berming can be used to temporarily enhance the ability of beaches to withstand overtopping. In cases where beaches serve as primary protection for development, anthropogenic berms may represent an attractive management option for temporarily addressing future flood hazards. Terrestrial laser scanning (TLS) or lidar has emerged as a valuable technology for capturing the three dimensional geometry of complex surfaces and objects, and in the context of coastal flood prediction mobile TLS could prove invaluable by quickly mapping beach topography before an imminent flood threat and reducing associated uncertainties in coastal flood forecasting systems. The research presented here highlights the results of a field campaign to document the initial conditions and dynamic erosion of anthropogenic berms using TLS. On three occasions in February and March of 2012, a prototype berm was constructed on the foreshore of the city of Newport Beach, CA at low tide, and was scanned to document its initial shape, and then scanned in near-continuous fashion with the rising tide to characterize its subsequent erosion. The purpose is two-fold: (1) to measure the performance of the TLS system relative to accuracy and assess strengths and drawbacks that are likely to bear on the suitability of this technology to support flood prediction as described above, and (2) to develop a better understanding of how typical southern California berms respond to hydrodynamic stresses (rising tides and waves). Near continuous scanning leads to a 4D model (3 spatial coordinates plus time) of the berm that documents its gradual erosion, including a characterization of how the berm crest and volume change over time, which offers primary data on how anthropogenic berms can be expected to perform during a flood event. Results reveal that TLS, when referenced to a temporary bench mark leveled to within 1.5 cm by RTK-GPS, achieves an absolute vertical accuracy of less than 3 cm (VRMSE) with a scan resolution of 10 cm or finer. In regards to berm morphodynamics, a near-linear increase in tide elevation over two hours caused a non-linear lowering of the berm crest with time, characterized first by a gradual and then by a rapid change. The overall erosion of the berm correlates best with the swash elevation in relation to the berm toe elevation. Across the three berm experiments, erosion begins when the swash elevation is about 13% below the toe of the berm, relative to the initial berm height, and the berm is overtopped when the swash elevation is 25-30% of the initial berm height and the berm is 70-75% eroded by volume.
Discharge characteristics of embankment-shaped weirs
Kindsvater, Carl E.
1964-01-01
An embankment-shaped weir is an embankment overtopped by flood waters. Among the engineering problems frequently resulting from. this occurrence is the need to compute the peak discharge from postflood yield observations. The research described in this. report was concerned with the theoretical and experimental bases for the computation procedure. The research had two main objectives. One was to determine the relationship between embankment form and roughness and some of the more important discharge characteristics. The second was to define, theoretically and experimentally, the relationship between free-flow discharge and the boundary layer on the roadway. The first objective was accomplished with the experimental determination of coefficients of discharge and other significant flow characteristics for a variety of boundary and flow conditions. The second objective was accomplished with the development and experimental verification of a discharge equation which involved the boundary layer displacement thickness. This phase of the research included a general investigation of boundary layer growth on the roadway. It is included that both free- and submerged-flow discharge are virtually independent of the influence of embankment shape and relative height. The influence of boundary resistance is appreciable only for smaller heads. The most practical solution for discharge is one which is based on. the simple weir equation and experimentally determined coefficients. A completely analytical equation of discharge is impractical. The report contains the results of 936 experiments on the discharge characteristics of 17 different models; plus 106 boundary-layer velocity traverses on 4 different models. The data are summarized in both graphical and tabular form.
Observing a catastrophic thermokarst lake drainage in northern Alaska
Jones, Benjamin M.; Arp, Christopher D.
2015-01-01
The formation and drainage of thermokarst lakes have reshaped ice-rich permafrost lowlands in the Arctic throughout the Holocene. North of Teshekpuk Lake, on the Arctic Coastal Plain of northern Alaska, thermokarst lakes presently occupy 22.5% of the landscape, and drained thermokarst lake basins occupy 61.8%. Analysis of remotely sensed imagery indicates that nine lakes (>10 ha) have drained in the 1,750 km2 study area between 1955 and 2014. The most recent lake drainage was observed using in situ data loggers providing information on the duration and magnitude of the event, and a nearby weather station provided information on the environmental conditions preceding the lake drainage. Lake 195 (L195), an 80 ha thermokarst lake with an estimated water volume of ~872,000 m3, catastrophically drained on 05 July 2014. Abundant winter snowfall and heavy early summer precipitation resulted in elevated lake water levels that likely promoted bank overtopping, thermo-erosion along an ice-wedge network, and formation of a 9 m wide, 2 m deep, and 70 m long drainage gully. The lake emptied in 36 hours, with 75% of the water volume loss occurring in the first ten hours. The observed peak discharge of the resultant flood was 25 m3/s, which is similar to that in northern Alaska river basins whose areas are more than two orders of magnitude larger. Our findings support the catastrophic nature of sudden lake drainage events and the mechanistic hypotheses developed by J. Ross Mackay.
3-D flow and scour near a submerged wing dike: ADCP measurements on the Missouri River
Jamieson, E.C.; Rennie, C.D.; Jacobson, R.B.; Townsend, R.D.
2011-01-01
Detailed mapping of bathymetry and three-dimensional water velocities using a boat-mounted single-beam sonar and acoustic Doppler current profiler (ADCP) was carried out in the vicinity of two submerged wing dikes located in the Lower Missouri River near Columbia, Missouri. During high spring flows the wing dikes become submerged, creating a unique combination of vertical flow separation and overtopping (plunging) flow conditions, causing large-scale three-dimensional turbulent flow structures to form. On three different days and for a range of discharges, sampling transects at 5 and 20 m spacing were completed, covering the area adjacent to and upstream and downstream from two different wing dikes. The objectives of this research are to evaluate whether an ADCP can identify and measure large-scale flow features such as recirculating flow and vortex shedding that develop in the vicinity of a submerged wing dike; and whether or not moving-boat (single-transect) data are sufficient for resolving complex three-dimensional flow fields. Results indicate that spatial averaging from multiple nearby single transects may be more representative of an inherently complex (temporally and spatially variable) three-dimensional flow field than repeated single transects. Results also indicate a correspondence between the location of calculated vortex cores (resolved from the interpolated three-dimensional flow field) and the nearby scour holes, providing new insight into the connections between vertically oriented coherent structures and local scour, with the unique perspective of flow and morphology in a large river.
King, S.E.; Grace, J.B.
2000-01-01
Cogongrass (Imperata cylindrica), an invasive perennial introduced from Southeast Asia, is currently spreading throughout the southeastern United States from Florida to Louisiana. In the U.S., cogongrass is generally not considered a wetland species, although it's range is expanding in regions with high wetland abundance. The objective of this study was to determine if excessive soil moisture might prevent cogongrass from establishing in areas with seasonally flooded soils. In one greenhouse experiment, we examined cogongrass germination and seedling growth in soils that were freely drained, saturated, and inundated. We performed a second greenhouse experiment to evaluate growth and survival of cogongrass seedlings of four different size classes in five soil moisture treatments ranging from dry to inundated. Cogongrass germination was lowest when seeds were overtopped with water. There were no differences in germination between saturated and freely drained treatments; however, seedlings grew largest in freely drained soil and were smallest when immersed. In our second experiment, most cogongrass plants survived except when given no water, but growth differed by watering treatment depending on seedling size. Increasing moisture was more detrimental to the growth of small seedlings compared to the growth of larger cogongrass plants. Overall, cogongrass was most sensitive to soil inundation in the earliest stages of establishment; thus, excessive moisture conditions in the spring, during early seedling development, could restrict invasion of cogongrass by seed. Once cogongrass is established, however, its tolerance of flooding appears to increase.
Assessing glacial lake outburst flood risk
NASA Astrophysics Data System (ADS)
Kougkoulos, Ioannis; Cook, Simon; Jomelli, Vincent; Clarke, Leon; Symeonakis, Elias
2017-04-01
Glaciers across the world are thinning and receding in response to atmospheric warming. Glaciers tend to erode subglacial basins and deposit eroded materials around their margins as lateral-frontal terminal moraines. Recession into these basins and behind impounding moraines causes meltwater to pond as proglacial and supraglacial lakes. Consequently, there has been a general trend of increasing number and size of these lakes associated with glacier melting in many mountainous regions around the globe, in the last 30 years. Glacial lake outburst floods (GLOFs) then may occur where the glacial lake dam (ice, rock, moraine, or combination thereof) is breached, or overtopped, and thousands of people have lost their lives to such events in the last few decades, especially in the Andes and in the Himalaya. Given the ongoing and arguably increasing risk posed to downstream communities, and infrastructure, there has been a proliferation of GLOF studies, with many seeking to estimate GLOF hazard or risk in specific regions, or to identify 'potentially dangerous glacial lakes'. Given the increased scientific interest in GLOFs, it is timely to evaluate critically the ways in which GLOF risk has been assessed previously, and whether there are improvements that can be made to the ways in which risk assessment is achieved. We argue that, whilst existing GLOF hazard and risk assessments have been extremely valuable they often suffer from a number of key shortcomings that can be addressed by using different techniques as multi-criteria decision analysis and hydraulic modelling borrowed from disciplines like engineering, remote sensing and operations research.
NASA Astrophysics Data System (ADS)
Zarekarizi, M.; Moradkhani, H.
2015-12-01
Extreme events are proven to be affected by climate change, influencing hydrologic simulations for which stationarity is usually a main assumption. Studies have discussed that this assumption would lead to large bias in model estimations and higher flood hazard consequently. Getting inspired by the importance of non-stationarity, we determined how the exceedance probabilities have changed over time in Johnson Creek River, Oregon. This could help estimate the probability of failure of a structure that was primarily designed to resist less likely floods according to common practice. Therefore, we built a climate informed Bayesian hierarchical model and non-stationarity was considered in modeling framework. Principle component analysis shows that North Atlantic Oscillation (NAO), Western Pacific Index (WPI) and Eastern Asia (EA) are mostly affecting stream flow in this river. We modeled flood extremes using peaks over threshold (POT) method rather than conventional annual maximum flood (AMF) mainly because it is possible to base the model on more information. We used available threshold selection methods to select a suitable threshold for the study area. Accounting for non-stationarity, model parameters vary through time with climate indices. We developed a couple of model scenarios and chose one which could best explain the variation in data based on performance measures. We also estimated return periods under non-stationarity condition. Results show that ignoring stationarity could increase the flood hazard up to four times which could increase the probability of an in-stream structure being overtopped.
Numerical simulation of multi-directional random wave transformation in a yacht port
NASA Astrophysics Data System (ADS)
Ji, Qiaoling; Dong, Sheng; Zhao, Xizeng; Zhang, Guowei
2012-09-01
This paper extends a prediction model for multi-directional random wave transformation based on an energy balance equation by Mase with the consideration of wave shoaling, refraction, diffraction, reflection and breaking. This numerical model is improved by 1) introducing Wen's frequency spectrum and Mitsuyasu's directional function, which are more suitable to the coastal area of China; 2) considering energy dissipation caused by bottom friction, which ensures more accurate results for large-scale and shallow water areas; 3) taking into account a non-linear dispersion relation. Predictions using the extended wave model are carried out to study the feasibility of constructing the Ai Hua yacht port in Qingdao, China, with a comparison between two port layouts in design. Wave fields inside the port for different incident wave directions, water levels and return periods are simulated, and then two kinds of parameters are calculated to evaluate the wave conditions for the two layouts. Analyses show that Layout I is better than Layout II. Calculation results also show that the harbor will be calm for different wave directions under the design water level. On the contrary, the wave conditions do not wholly meet the requirements of a yacht port for ship berthing under the extreme water level. For safety consideration, the elevation of the breakwater might need to be properly increased to prevent wave overtopping under such water level. The extended numerical simulation model may provide an effective approach to computing wave heights in a harbor.
An early warning system for marine storm hazard mitigation
NASA Astrophysics Data System (ADS)
Vousdoukas, M. I.; Almeida, L. P.; Pacheco, A.; Ferreira, O.
2012-04-01
The present contribution presents efforts towards the development of an operational Early Warning System for storm hazard prediction and mitigation. The system consists of a calibrated nested-model train which consists of specially calibrated Wave Watch III, SWAN and XBeach models. The numerical simulations provide daily forecasts of the hydrodynamic conditions, morphological change and overtopping risk at the area of interest. The model predictions are processed by a 'translation' module which is based on site-specific Storm Impact Indicators (SIIs) (Ciavola et al., 2011, Storm impacts along European coastlines. Part 2: lessons learned from the MICORE project, Environmental Science & Policy, Vol 14), and warnings are issued when pre-defined threshold values are exceeded. For the present site the selected SIIs were (i) the maximum wave run-up height during the simulations; and (ii) the dune-foot horizontal retreat at the end of the simulations. Both SIIs and pre-defined thresholds were carefully selected on the grounds of existing experience and field data. Four risk levels were considered, each associated with an intervention approach, recommended to the responsible coastal protection authority. Regular updating of the topography/bathymetry is critical for the performance of the storm impact forecasting, especially when there are significant morphological changes. The system can be extended to other critical problems, like implications of global warming and adaptive management strategies, while the approach presently followed, from model calibration to the early warning system for storm hazard mitigation, can be applied to other sites worldwide, with minor adaptations.
Surface Wave Characterization of New Orleans Levee Soil Foundations
NASA Astrophysics Data System (ADS)
Delisser, T. A.; Lorenzo, J. M.; Hayashi, K.; Craig, M. S.
2016-12-01
Standard geotechnical tests such as the drilling of boreholes and cone penetration tests are able to assess soil stability at point locations vertically but lack lateral resolution in a complex sedimentary environment, such as the Louisiana Coastal system. Multi-Channel Analysis of Surface Waves (MASW) can complement geotechnical tests to improve certainty in resolving lateral features when predicting soil types in the near surface of levee soil foundations. A portion of the Inner-Harbor Navigation Canal levee wall that intersects the 9th Ward of New Orleans failed in the aftermath of Hurricane Katrina in 2005. Failures were attributed to floodwaters overtopping the levee wall and eroding its base. Geotechnical and geological data from test points can be used to calibrate continuous shear strength estimates derived from MASW. It is important to understand soil stability and strength to prevent future failures in New Orleans levee foundation soils. MASW analyzes the dispersive property of Rayleigh waves to develop shear wave velocity profiles for the near surface. Data are acquired using a seismic land streamer containing 4.5-Hz vertical-component geophones and a sledgehammer as the source. We plot and contour 18 inverted models of the interpreted fundamental mode and generate a 200-m-long profile to help us (1) better understand the characteristics of levee foundation soils as well as (2) improve existing geological cross-sections to help in future planning and maintenance of the levees. In comparison to the prior geological models, we find unexpected large vertical and horizontal shear-velocity gradients, as well as relatively low shear strengths throughout the seismic profile.
Statistical wave climate projections for coastal impact assessments
NASA Astrophysics Data System (ADS)
Camus, P.; Losada, I. J.; Izaguirre, C.; Espejo, A.; Menéndez, M.; Pérez, J.
2017-09-01
Global multimodel wave climate projections are obtained at 1.0° × 1.0° scale from 30 Coupled Model Intercomparison Project Phase 5 (CMIP5) global circulation model (GCM) realizations. A semi-supervised weather-typing approach based on a characterization of the ocean wave generation areas and the historical wave information from the recent GOW2 database are used to train the statistical model. This framework is also applied to obtain high resolution projections of coastal wave climate and coastal impacts as port operability and coastal flooding. Regional projections are estimated using the collection of weather types at spacing of 1.0°. This assumption is feasible because the predictor is defined based on the wave generation area and the classification is guided by the local wave climate. The assessment of future changes in coastal impacts is based on direct downscaling of indicators defined by empirical formulations (total water level for coastal flooding and number of hours per year with overtopping for port operability). Global multimodel projections of the significant wave height and peak period are consistent with changes obtained in previous studies. Statistical confidence of expected changes is obtained due to the large number of GCMs to construct the ensemble. The proposed methodology is proved to be flexible to project wave climate at different spatial scales. Regional changes of additional variables as wave direction or other statistics can be estimated from the future empirical distribution with extreme values restricted to high percentiles (i.e., 95th, 99th percentiles). The statistical framework can also be applied to evaluate regional coastal impacts integrating changes in storminess and sea level rise.
Nateghi, Roshanak; Bricker, Jeremy D; Guikema, Seth D; Bessho, Akane
2016-01-01
The Pacific coast of the Tohoku region of Japan experiences repeated tsunamis, with the most recent events having occurred in 1896, 1933, 1960, and 2011. These events have caused large loss of life and damage throughout the coastal region. There is uncertainty about the degree to which seawalls reduce deaths and building damage during tsunamis in Japan. On the one hand they provide physical protection against tsunamis as long as they are not overtopped and do not fail. On the other hand, the presence of a seawall may induce a false sense of security, encouraging additional development behind the seawall and reducing evacuation rates during an event. We analyze municipality-level and sub-municipality-level data on the impacts of the 1896, 1933, 1960, and 2011 tsunamis, finding that seawalls larger than 5 m in height generally have served a protective role in these past events, reducing both death rates and the damage rates of residential buildings. However, seawalls smaller than 5 m in height appear to have encouraged development in vulnerable areas and exacerbated damage. We also find that the extent of flooding is a critical factor in estimating both death rates and building damage rates, suggesting that additional measures, such as multiple lines of defense and elevating topography, may have significant benefits in reducing the impacts of tsunamis. Moreover, the area of coastal forests was found to be inversely related to death and destruction rates, indicating that forests either mitigated the impacts of these tsunamis, or displaced development that would otherwise have been damaged.
Nateghi, Roshanak; Bricker, Jeremy D.; Guikema, Seth D.; Bessho, Akane
2016-01-01
The Pacific coast of the Tohoku region of Japan experiences repeated tsunamis, with the most recent events having occurred in 1896, 1933, 1960, and 2011. These events have caused large loss of life and damage throughout the coastal region. There is uncertainty about the degree to which seawalls reduce deaths and building damage during tsunamis in Japan. On the one hand they provide physical protection against tsunamis as long as they are not overtopped and do not fail. On the other hand, the presence of a seawall may induce a false sense of security, encouraging additional development behind the seawall and reducing evacuation rates during an event. We analyze municipality-level and sub-municipality-level data on the impacts of the 1896, 1933, 1960, and 2011 tsunamis, finding that seawalls larger than 5 m in height generally have served a protective role in these past events, reducing both death rates and the damage rates of residential buildings. However, seawalls smaller than 5 m in height appear to have encouraged development in vulnerable areas and exacerbated damage. We also find that the extent of flooding is a critical factor in estimating both death rates and building damage rates, suggesting that additional measures, such as multiple lines of defense and elevating topography, may have significant benefits in reducing the impacts of tsunamis. Moreover, the area of coastal forests was found to be inversely related to death and destruction rates, indicating that forests either mitigated the impacts of these tsunamis, or displaced development that would otherwise have been damaged. PMID:27508461
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stevenson, A.J.; Scholl, D.W.; Vallier, T.L.
1990-05-01
The central segment of the Aleutian Trench (162{degree}W to 175{degree}E) is an intraoceanic subduction zone that contains an anomalously thick sedimentary fill (4 km maximum). The fill is an arcward-thickening and slightly tilted wedge of sediment characterized acoustically by laterally continuous, closely spaced, parallel reflectors. These relations are indicative of turbidite deposition. The trench floor and reflection horizons are planar, showing no evidence of an axial channel or any transverse fan bodies. Cores of surface sediment recover turbidite layers, implying that sediment transport and deposition occur via diffuse, sheetlike, fine-grained turbidite flows that occupy the full width of the trench.more » The mineralogy of Holocene trench sediments document a mixture of island-arc (dominant) and continental source terranes. GLORIA side-scan sonar images reveal a westward-flowing axial trench channel that conducts sediment to the eastern margin of the central segment, where channelized flow cases. Much of the sediment transported in this channel is derived from glaciated drainages surrounding the Gulf of Alaska which empty into the eastern trench segment via deep-sea channel systems (Surveyor and others) and submarine canyons (Hinchinbrook and others). Insular sediment transport is more difficult to define. GLORIA images show the efficiency with which the actively growing accretionary wedge impounds sediment that manages to cross a broad fore-arc terrace. It is likely that island-arc sediment reaches the trench either directly via air fall, via recycling of the accretionary prism, or via overtopping of the accretionary ridges by the upper parts of thick turbidite flows.« less
Upstream structural management measures for an urban area flooding in Turkey
NASA Astrophysics Data System (ADS)
Akyurek, Z.; Bozoğlu, B.; Sürer, S.; Mumcu, H.
2015-06-01
In recent years, flooding has become an increasing concern across many parts of the world of both the general public and their governments. The climate change inducing more intense rainfall events occurring in short period of time lead flooding in rural and urban areas. In this study the flood modelling in an urbanized area, namely Samsun-Terme in Blacksea region of Turkey is performed. MIKE21 with flexible grid is used in 2-dimensional shallow water flow modelling. 1 × 1000-1 scaled maps with the buildings for the urbanized area and 1 × 5000-1 scaled maps for the rural parts are used to obtain DTM needed in the flood modelling. The bathymetry of the river is obtained from additional surveys. The main river passing through the urbanized area has a capacity of 500 m3 s-1 according to the design discharge obtained by simple ungauged discharge estimation depending on catchment area only. The upstream structural base precautions against flooding are modelled. The effect of four main upstream catchments on the flooding in the downstream urban area are modelled as different scenarios. It is observed that if the flow from the upstream catchments can be retarded through a detention pond constructed in one of the upstream catchments, estimated Q100 flood can be conveyed by the river without overtopping from the river channel. The operation of the upstream detention ponds and the scenarios to convey Q500 without causing flooding are also presented. Structural management measures to address changes in flood characteristics in water management planning are discussed.
House, P.K.; Pearthree, P.A.; Perkins, M.E.
2008-01-01
Late Miocene and early Pliocene sediments exposed along the lower Colorado River near Laughlin, Nevada, contain evidence that establishment of this reach of the river after 5.6 Ma involved flooding from lake spillover through a bedrock divide between Cottonwood Valley to the north and Mohave Valley to the south. Lacustrine marls interfingered with and conformably overlying a sequence of post-5.6 Ma finegrained valley-fill deposits record an early phase of intermittent lacustrine inundation restricted to Cottonwood Valley. Limestone, mud, sand, and minor gravel of the Bouse Formation were subsequently deposited above an unconformity. At the north end of Mohave Valley, a coarse-grained, lithologically distinct fluvial conglomerate separates subaerial, locally derived fan deposits from subaqueous deposits of the Bouse Formation. We interpret this key unit as evidence for overtopping and catastrophic breaching of the paleodivide immediately before deep lacustrine inundation of both valleys. Exposures in both valleys reveal a substantial erosional unconformity that records drainage of the lake and predates the arrival of sediment of the through-going Colorado River. Subsequent river aggradation culminated in the Pliocene between 4.1 and 3.3 Ma. The stratigraphic associations and timing of this drainage transition are consistent with geochemical evidence linking lacustrine conditions to the early Colorado River, the timings of drainage integration and canyon incision on the Colorado Plateau, the arrival of Colorado River sand at its terminus in the Salton Trough, and a downstream-directed mode of river integration common in areas of crustal extension. ?? 2008 The Geological Society of America.
Using HPC within an operational forecasting configuration
NASA Astrophysics Data System (ADS)
Jagers, H. R. A.; Genseberger, M.; van den Broek, M. A. F. H.
2012-04-01
Various natural disasters are caused by high-intensity events, for example: extreme rainfall can in a short time cause major damage in river catchments, storms can cause havoc in coastal areas. To assist emergency response teams in operational decisions, it's important to have reliable information and predictions as soon as possible. This starts before the event by providing early warnings about imminent risks and estimated probabilities of possible scenarios. In the context of various applications worldwide, Deltares has developed an open and highly configurable forecasting and early warning system: Delft-FEWS. Finding the right balance between simulation time (and hence prediction lead time) and simulation accuracy and detail is challenging. Model resolution may be crucial to capture certain critical physical processes. Uncertainty in forcing conditions may require running large ensembles of models; data assimilation techniques may require additional ensembles and repeated simulations. The computational demand is steadily increasing and data streams become bigger. Using HPC resources is a logical step; in different settings Delft-FEWS has been configured to take advantage of distributed computational resources available to improve and accelerate the forecasting process (e.g. Montanari et al, 2006). We will illustrate the system by means of a couple of practical applications including the real-time dynamic forecasting of wind driven waves, flow of water, and wave overtopping at dikes of Lake IJssel and neighboring lakes in the center of The Netherlands. Montanari et al., 2006. Development of an ensemble flood forecasting system for the Po river basin, First MAP D-PHASE Scientific Meeting, 6-8 November 2006, Vienna, Austria.
NASA Astrophysics Data System (ADS)
Davis, S. J.; Wiegand, B. A.; Chamberlain, C. P.
2007-12-01
Isotopic records from the Uinta basin in Utah are evidence of an evolving landscape during the early Cenozoic. Combined with studies of provenance and paleoflow, oxygen and carbon isotopic results have recently been interpreted to reflect changes in hydrology and catchment hypsometry as the basin responded to developing relief in the foreland. We now present strontium isotope data from lacustrine limestones indicating significant and rapid (< 1 my) shifts in the source of inflowing surface waters. Provenance of Eocene sediments has been used to argue that water spilling south from an overfilled Lake Gosiute in the Greater Green River basin caused a highstand of the lake in the Piceance Creek basin, which in turn overtopped the Douglas Creek Arch and connected with Lake Uinta in the Uinta basin. The lake highstand was extremely productive, and resulted in the deposition of the rich "Mahogany zone" oil shales. New data shows that the 87Sr/86Sr ratio of lacustrine limestones collected in the Uinta basin is generally low (< 0.7105) for most of the Eocene, but spikes higher (to 0.7122) in samples of the Main Body of the Green River Formation near and within the Mahogany zone. We interpret this data to reflect a period of input of water from Lake Gosiute, where that lake's catchments included exposed basement that was much more radiogenic. The strontium data further supports the interpretation that intraforeland basin development in the central North American Cordillera was largely controlled by shifting drainage patterns as the landscape responded to ongoing Laramide tectonism.
Hunt, Charles D.; De Carlo, Eric H.
2000-01-01
The James Campbell National Wildlife Refuge occupies two lowland marsh and pond complexes on the northern coastal plain of Oahu: the mostly natural ponds and wetlands of the Punamano Unit and the constructed ponds of the Kii Unit. The U.S. Fish and Wildlife Service manages the Refuge primarily to protect and enhance habitat for four endangered species of Hawaiian waterbirds. Kii Unit is fed by artesian wells and rainfall, whereas Punamano Unit is fed naturally by rainfall, runoff, and ground-water seepage. Streams drain from the uplands into lowland ditches that pass through Kii Unit on their way to the ocean. A high-capacity pump transfers water from the inner ditch terminus at Kii to the ocean outlet channel. Stormwaters also exit the inner ditch system over flood-relief swales near the outlet pump and through a culvert with a one-way valve. A hydrologic investigation was done from November 1996 through February 1998 to identify and quantify principal inflows and outflows of water to and from the Refuge, identify hydraulic factors affecting flooding, document ground-water/surface-water interactions, determine the adequacy of the current freshwater supply, and determine water and sediment quality. These goals were accomplished by installing and operating a network of stream-gaging stations, meteorology stations, and shallow ground-water piezometers, by computing water budgets for the two Refuge units, and by sampling and analyzing water and pond-bottom sediments for major ions, trace metals, and organic compounds. Streamflow during the study was dominated by winter stormflows, followed by a gradual recession of flow into summer 1997, as water that had been stored in alluvial fans drained to lowland ditches. Outflow at the ditch terminus in 1997 was 125 million gallons greater than measured inflow to the coastal plain, mainly reflecting gains from ground water along the ditches between outlying gages and the ditch terminus. Of the measured 1997 outflow, 98 percent was through the Kii outlet pump, with the outlet culvert valve only opening for brief periods during storms. Large volumes of stormflow overflowed the flood-relief swales unmeasured. The largest storm of the study, in November 1996, was estimated to have a flood frequency of about 3 to 4 years. Streamflow exceeded culvert capacity and overtopped Kamehameha Highway at Kalaeokahipa Stream and Hospital ditch. Slight overbank flooding in Kii ditch resulted strictly from high discharge. Minor overbank flooding farther out on the coastal plain probably was caused mainly by the small hydraulic gradients available to convey stormflows along the lowland ditches. Stormwaters flooded Kii ponds and flowed back upstream along Punamano ditch into Punamano marsh, introducing suspended sediment and possibly other contaminants to the Refuge. Two smaller storms in January 1997 resulted in smaller flows and no overbank flooding. The Kii outlet pump ran continuously for 7 days during the November 1996 storm and for 1 to 2 days during the January 1997 storms. During all three storms, the outlet culvert valve opened and the inner ditches overtopped the flood-relief swales, allowing free outflow of water from the inner ditch. Backwater effects hindered drainage during the January 1997 storms at Hospital ditch at Kamehameha Highway, and at Punamano ditch at Nudist Camp Road (where the backflow into Punamano marsh in November 1996 constituted an extreme backwater effect). A probable marine backwater effect was imposed at the ocean outlet ditch during the November 1996 storm through a combination of high spring tides and wave setup from large surf. Whether this backwater effect propagated upstream in the ditches to affect inland sites could not be determined conclusively. A sand plug may have built up in the ocean outlet channel before the November 1996 storm, but if so, it probably washed out prior to, or early in the storm, and was not present at the time of peak stage at inlan
NASA Astrophysics Data System (ADS)
Mergili, Martin; Schneider, Demian; Andres, Norina; Worni, Raphael; Gruber, Fabian; Schneider, Jean F.
2010-05-01
Lake Outburst Floods can evolve from complex process chains like avalanches of rock or ice that produce flood waves in a lake which may overtop and eventually breach glacial, morainic, landslide, or artificial dams. Rising lake levels can lead to progressive incision and destabilization of a dam, to enhanced ground water flow (piping), or even to hydrostatic failure of ice dams which can cause sudden outflow of accumulated water. These events often have a highly destructive potential because a large amount of water is released in a short time, with a high capacity to erode loose debris, leading to a powerful debris flow with a long travel distance. The best-known example of a lake outburst flood is the Vajont event (Northern Italy, 1963), where a landslide rushed into an artificial lake which spilled over and caused a flood leading to almost 2000 fatalities. Hazards from the failure of landslide dams are often (not always) fairly manageable: most breaches occur in the first few days or weeks after the landslide event and the rapid construction of a spillway - though problematic - has solved some hazardous situations (e.g. in the case of Hattian landslide in 2005 in Pakistan). Older dams, like Usoi dam (Lake Sarez) in Tajikistan, are usually fairly stable, though landsildes into the lakes may create floodwaves overtopping and eventually weakening the dams. The analysis and the mitigation of glacial lake outburst flood (GLOF) hazard remains a challenge. A number of GLOFs resulting in fatalities and severe damage have occurred during the previous decades, particularly in the Himalayas and in the mountains of Central Asia (Pamir, Tien Shan). The source area is usually far away from the area of impact and events occur at very long intervals or as singularities, so that the population at risk is usually not prepared. Even though potentially hazardous lakes can be identified relatively easily with remote sensing and field work, modeling and predicting of GLOFs (and also the outburst of landslide-dammed lakes) remains a challenge: • The knowledge about the onset of the process is often limited (bathymetry of the lakes, subsurface water, properties of dam (content of ice), type of dam breach, understanding of process chains and interactions). • The size of glacial lakes may change rapidly but continuously, and many lakes break out within a short time after their development. Continuous monitoring is therefore required to keep updated on the existing hazards. • Also the outburst of small glacial lakes may lead to significant debris floods or even debris flows if there is plenty of erodible material available. • The available modeling software packages are of limited suitability for lake outburst floods: e.g. software developed by the hydrological community is specialized to simulate (debris) floods with input hydrographs on moderately steep flow channels and with lower sediment loads. In contrast to this, programs for rapid mass movements are better suited on steeper slopes and sudden onset of the movement. The typical characteristics of GLOFs are in between and vary for different channel sections. In summary, the major bottlenecks remain in deriving realistic or worst case scenarios and predicting their magnitude and area of impact. This mainly concerns uncertainties in the dam break process, involved volumes, erosion rates, changing rheologies, and the limited capabilities of available software packages to simulate process interactions and transformations such as the development of a hyperconcentrated flow into a debris flow. In addition, many areas prone to lake outburst floods are located in developing countries with a limited scope of the threatened population for decision-making and limited resources for mitigation.
Ahearn, Elizabeth A.; Lombard, Pamela J.
2014-01-01
Flint Brook, a tributary to the Third Branch White River in Roxbury, Vermont, has a history of flooding the Vermont Fish and Wildlife Department’s Roxbury Fish Culture Station (the hatchery) and surrounding infrastructure. Flooding resulting from tropical storm Irene on August 28–29, 2011, caused widespread destruction in the region, including extensive and costly damages to the State-owned hatchery and the transportation infrastructure in the Town of Roxbury, Vermont. Sections of State Route 12A were washed out, and several bridges and culverts on Oxbow Road, Thurston Hill Road, and the New England Central Railroad in Roxbury were heavily damaged. Record high peak-discharge estimates of 2,140 cubic feet per second (ft3/s) and 4,320 ft3/s were calculated for Flint Brook at its confluence with the Third Branch White River and for the Third Branch White River at about 350 feet (ft) downstream from the hatchery, respectively. The annual exceedance probabilities (AEPs) of the peak discharges for Flint Brook and the Third Branch White River were less than 0.2 percent (less than a one in 500 chance of occurring in a given year). Hydrologic and hydraulic analyses of Flint Brook and the Third Branch White River were done to investigate flooding at the hatchery in Roxbury and support efforts by the Federal Emergency Management Agency to assist State and local mitigation and reconstruction efforts. During the August 2011 flood, the majority of flow from Flint Brook (97 percent or 2,070 ft3/s) diverged from its primary watercourse due to a retaining wall failure immediately upstream of Oxbow Road and inundated the hatchery. Although a minor amount of flow from the Third Branch White River could have overtopped State Route 12A and spilled into the hatchery, the Third Branch White River did not cause flood damages or exacerbate flooding at the hatchery during the August 2011 flood. The Third Branch White River which flows adjacent to the hatchery does not flood the hatchery for the 10-, 2-, 1, or 0.2-percent annual exceedance probabilities. The simulated water-surface elevations for August 2011 flood equal the elevations of State Route 12A about 500 ft downstream of Thurston Hill Road adjacent to the troughs between the rearing ponds. Four flood mitigation alternatives being considered by the Vermont Agency of Transportation to improve the hydraulic performance of Flint Brook and reduce the risk of flooding at the hatchery include: (A) no changes to the infrastructure or existing alignment of Flint Brook (existing conditions [2014]), (B) structural changes to the bridges and the existing retaining wall along Flint Brook, (C) realignment of Flint Brook to flow along the south side of Oxbow Road to accommodate larger stream discharges, and (D) a diversion channel for flows greater than 1-percent annual exceedance probability. Although the 10-, 2-, and 1-percent AEP floods do not flood the hatchery under alternative A (no changes to the infrastructure), the 0.2-percent AEP flow still poses a flooding threat to the hatchery because flow will continue to overtop the existing retaining wall and flood the hatchery. Under the other mitigation alternatives (B, C, and D) that include some variation of structural changes to bridges, a retaining wall, and (or) channel, the peak discharges for the 10-, 2-, 1-, and 0.2-percent annual exceedance probabilities do not flood the hatchery. Water-surface profiles and flood inundation maps of the August 2011 flood and the 10-, 2-, 1-, and 0.2-percent AEPs for four mitigation alternatives were developed for Flint Brook and the Third Branch White River in the vicinity of the hatchery and can be used by the Federal, State, and local agencies to better understand the potential for future flooding at the hatchery.
Analysis of flood hazard under consideration of dike breaches
NASA Astrophysics Data System (ADS)
Vorogushyn, S.; Apel, H.; Lindenschmidt, K.-E.; Merz, B.
2009-04-01
The study focuses on the development and application of a new modelling system which allows a comprehensive flood hazard assessment along diked river reaches under consideration of dike failures. The proposed Inundation Hazard Assessment Model (IHAM) represents a hybrid probabilistic-deterministic model. It comprises three models interactively coupled at runtime. These are: (1) 1D unsteady hydrodynamic model of river channel and floodplain flow between dikes, (2) probabilistic dike breach model which determines possible dike breach locations, breach widths and breach outflow discharges, and (3) 2D raster-based diffusion wave storage cell model of the hinterland areas behind the dikes. Due to the unsteady nature of the 1D and 2D coupled models, the dependence between hydraulic load at various locations along the reach is explicitly considered. The probabilistic dike breach model describes dike failures due to three failure mechanisms: overtopping, piping and slope instability caused by the seepage flow through the dike core (micro-instability). Dike failures for each mechanism are simulated based on fragility functions. The probability of breach is conditioned by the uncertainty in geometrical and geotechnical dike parameters. The 2D storage cell model driven by the breach outflow boundary conditions computes an extended spectrum of flood intensity indicators such as water depth, flow velocity, impulse, inundation duration and rate of water rise. IHAM is embedded in a Monte Carlo simulation in order to account for the natural variability of the flood generation processes reflected in the form of input hydrographs and for the randomness of dike failures given by breach locations, times and widths. The scenario calculations for the developed synthetic input hydrographs for the main river and tributary were carried out for floods with return periods of T = 100; 200; 500; 1000 a. Based on the modelling results, probabilistic dike hazard maps could be generated that indicate the failure probability of each discretised dike section for every scenario magnitude. Besides the binary inundation patterns that indicate the probability of raster cells being inundated, IHAM generates probabilistic flood hazard maps. These maps display spatial patterns of the considered flood intensity indicators and their associated return periods. The probabilistic nature of IHAM allows for the generation of percentile flood hazard maps that indicate the median and uncertainty bounds of the flood intensity indicators. The uncertainty results from the natural variability of the flow hydrographs and randomness of dike breach processes. The same uncertainty sources determine the uncertainty in the flow hydrographs along the study reach. The simulations showed that the dike breach stochasticity has an increasing impact on hydrograph uncertainty in downstream direction. Whereas in the upstream part of the reach the hydrograph uncertainty is mainly stipulated by the variability of the flood wave form, the dike failures strongly shape the uncertainty boundaries in the downstream part of the reach. Finally, scenarios of polder deployment for the extreme floods with T = 200; 500; 1000 a were simulated with IHAM. The results indicate a rather weak reduction of the mean and median flow hydrographs in the river channel. However, the capping of the flow peaks resulted in a considerable reduction of the overtopping failures downstream of the polder with a simultaneous slight increase of the piping and slope micro-instability frequencies explained by a more durable average impoundment. The developed IHAM simulation system represents a new scientific tool for studying fluvial inundation dynamics under extreme conditions incorporating effects of technical flood protection measures. With its major outputs in form of novel probabilistic inundation and dike hazard maps, the IHAM system has a high practical value for decision support in flood management.
Assessment of increased thermal activity at Mount Baker, Washington, March 1975-March 1976
Frank, David; Meier, Mark Frederick; Swanson, Donald A.; with contributions by Babcock, James W.; Fretwell, Marvin O.; Malone, Stephen D.; Rosenfeld, Charles L.; Shreve, Ronald L.; Wilcox, Ray E.
1977-01-01
In March 1975 Mount Baker showed a large increase in thermal emission, which has persisted for more than 1 year. Fumarole ejecta accompanied the thermal activity from March to September, but the ejecta had no constituents that suggest a magmatic source. Estimates of that part of the total heat flux that would account for the observed snow and ice loss show that the heat-flow increase was roughly one order of magnitude, from about 2 megawatts at 10 watts per square meter, averaged over Sherman Crater before 1975, to about 30 megawatts at 180 watts per square meter, during 1975. Almost half of the glacier that occupied the basin of Sherman Crater was melted in 1975. The new activity generated great concern among the public and the government agencies responsible for geological evaluation of potential hazards and for protection of life and property. The past geologic history, current topography, rock alteration, and location of major fumarolic activity indicate that large rock avalanches and mudflows on the east slope in Boulder Creek valley are the potential hazards of most significance related to present conditions. The most probable types of large mass movements would be mudflows, having speeds of as much as 50 kilometers per hour, that would originate from mixtures of snow, ice, and melt water and avalanches of structurally weak clay-rich rocks that make up the rim of Sherman Crater. Similar mudflows from the volcano have traveled at least 12 kilometers 8 times during the past 10,000 years. A possible worst case event, however, might be a larger, air-cushioned avalanche of as much as 20 to 30 million cubic meters that could hit Baker Lake at speeds of more than 300 kilometers per hour and generate a wave of water large enough to overtop Upper Baker Dam. At least 30 million cubic meters of potentially unstable material occurs as hydrothermally altered remnants of the rim of Sherman Crater and could provide the required volume for the estimated worst case event or for smaller avalanches and mudflows. An earthquake, steam explosion, or eruption could provide a suitable trigger to initiate movement. Although such triggering events were possible before 1975, the probability might have been as much as 10 times greater in 1975 because of the increased thermal activity. The threat of avalanches and mudflows on Boulder Creek valley and Baker Lake prompted the closure by management agencies of the Boulder Creek drainage and of Baker Lake and its shoreline in the summer of 1975. Additionally, Baker Lake was kept below full pool at a level calculated to prevent overtopping of Upper Baker Dam by waves which could result from a worst-case avalanche. In 1975 an interdisciplinary program of seismic, tilt, gravity, gas, hydrologic, petrologic, thermal infrared, and photographic studies by Federal and university scientists was initiated to evaluate the impact of the current thermal activity and to monitor changes that might indicate an impending eruption. By March 1976 only one small earth- quake had been identified beneath Mount Baker. Tilt and gravity changes have been observed but cannot be attributed solely to volcanic causes. The data available thus far provide no evidence of an impending eruption, but they cannot be fully interpreted without many additional geophysical and geochemical measurements, as it is not yet possible to clearly distinguish volcanic effects from non- volcanic background effects. Inasmuch as current activity continues unchanged - without steam explosions, eruptions, or frequent or large earthquakes - the probability of a suitable trigger for large avalanches and mudflows should decrease and should approach that of a more average year. Such an average year would have a hazard probability at least as great as that which existed before 1975, although that level of hazard was not recognized at the time by the public or by administrative agencies. The potential hazard and the uncertainties of future activ
McCulloch, David S.
1966-01-01
The March 27, 1964, earthquake dislodged slides from nine deltas in Kenai Lake, south-central Alaska. Sliding removed protruding parts of deltas-often the youngest parts-and steepened delta fronts, increasing the chances of further sliding. Fathograms show that debris from large slides spread widely over the lake floor, some reaching the toe of the opposite shore; at one place debris traveled 5,000 feet over the horizontal lake floor. Slides generated two kinds of local waves: a backfill and far-shore wave. Backfill waves were formed by water that rushed toward the delta to fill the void left by the sinking slide mass, overtopped the slide scrap, and came ashore over the delta. Some backfill waves had runup heights of 30 feet and ran inland more than 300 feet, uprooting and breaking off large trees. Far-shore waves hit the shore opposite the slides. They were formed by slide debris that crossed the lake floor and forced water ahead of it, which then ran up the opposite slope, burst above the lake surface, and struck the shore. One far-shore wave had a runup height of 72 feet. Kenai Lake was tilted and seiched; a power spectrum analysis of a limnogram shows a wave having the period of the calculated uninodal seiche (36 minutes) and several shorter period waves. In constricted and shallow reaches, waves caused by seiching had 20- and 30-foot runup heights. Deep lateral spreading of sediments toward delta margins displaced deeply driven railroad-bridge piles, and set up stress fields in the surface sediments which resulted in the formation of many shear and some tension fractures on the surface of two deltas.
Harp, Edwin L.; Crone, Anthony J.
2006-01-01
The October 8, 2005, Kashmir earthquake (M 7.6) triggered several thousand landslides, mainly rock falls and rock slides, in the epicentral area near the cities of Muzafarrabad and Balakot, Pakistan. Most of these were shallow, coalescing rock slides emanating from highly sheared and deformed limestone and dolomite of the Precambrian Muzafarrabad Formation. The largest landslide triggered by the earthquake is located approximately 32 kilometers southeast of Muzafarrabad in a tributary valley of the Jhelum River. This landslide is a debris avalanche of approximately 80 million cubic meters volume within the Miocene Murree Formation consisting of mixed sandstone, mudstone, shale, and limestone. The avalanche buried the village of Dandbeh and resulted in approximately 1,000 fatalities, according to local residents. The avalanche deposit traveled approximately 1.5 kilometers downslope and 300 meters or more up the opposite slope in the adjacent Karli stream drainage and also extended into the Tang stream drainage where the Tang stream joins the Karli drainage. The landslide mass has impounded two lakes within the blocked drainages. The lake in the Karli drainage was approximately 800 meters long and 20 meters deep as of December 19, 2005. The lake in the Tang drainage was approximately 400 meters long and 10 meters deep as of this same date. Downstream populations are at risk from possible flash flooding when these debris dams are overtopped by the reservoir water. The closest village, Hattian, is 2.8 kilometers downstream at the junction of the Jhelum River and the landslide-dammed Karli tributary. Other populations along the Jhelum River may also be at risk. Pakistan military engineers are preparing to construct a spillway within the landslide deposits to lessen the severity of the flood if the lake in the Karli stream drainage breaches the landslide dam catastrophically.
NASA Astrophysics Data System (ADS)
Tappin, D. R.; Jordan, H. M.; Jordan, C. J.; Richmond, B. M.; Sugawara, D.; Goto, K.
2012-12-01
A combination of time-series satellite imagery, helicopter-borne video footage and field observation is used to identify the impact of a major tsunami on a low-lying coastal zone located in eastern Japan. A comparison is made between the coast protected by hard sea walls and the coast without. Changes to the coast are mapped from before and after imagery, and sedimentary processes identified from the video footage. The results are validated by field observations. The impact along a 'natural' coast, with minimal defences, is erosion focussed on the back beach. There is little erosion (or sedimentation) of the whole beach, and where active, erosion mainly forms V-shaped channels that are initiated during the tsunami flood and then further developed during backwash. Enigmatic, short lived, 'strand lines' are attributed to the slow fall of sea level after such a major tsunami. Backwash on such a low lying area takes place as sheet flood immediately after tsunami flooding has ceased, and then subsequently, when the water level landward of coastal ridges falls below their elevation, becomes confined to channels formed on the coastal margin by the initial tsunami impact. Immediately after the tsunami coastal reconstruction begins, sourced from the sediment recently flushed into the sea by tsunami backwash. Hard engineering structures are found to be small defence against highly energetic tsunami waves that overtop them. The main cause of damage is scouring at the landward base of concrete-faced embankments constructed to defend the coast from erosion, that results in foundation-weakening and collapse.
NASA Astrophysics Data System (ADS)
Montereale-Gavazzi, Giacomo; Roche, Marc; Lurton, Xavier; Degrendele, Koen; Terseleer, Nathan; Van Lancker, Vera
2018-06-01
To characterize seafloor substrate type, seabed mapping and particularly multibeam echosounding are increasingly used. Yet, the utilisation of repetitive MBES-borne backscatter surveys to monitor the environmental status of the seafloor remains limited. Often methodological frameworks are missing, and should comprise of a suite of change detection procedures, similarly to those developed in the terrestrial sciences. In this study, pre-, ensemble and post-classification approaches were tested on an eight km2 study site within a Habitat Directive Area in the Belgian part of the North Sea. In this area, gravel beds with epifaunal assemblages were observed. Flourishing of the fauna is constrained by overtopping with sand or increased turbidity levels, which could result from anthropogenic activities. Monitoring of the gravel to sand ratio was hence put forward as an indicator of good environmental status. Seven acoustic surveys were undertaken from 2004 to 2015. The methods allowed quantifying temporal trends and patterns of change of the main substrate classes identified in the study area; namely fine to medium homogenous sand, medium sand with bioclastic detritus and medium to coarse sand with gravel. Results indicated that by considering the entire study area and the entire time series, the gravel to sand ratio fluctuated, but was overall stable. Nonetheless, when only the biodiversity hotspots were considered, net losses and a gradual trend, indicative of potential smothering, was captured by ensemble and post-classification approaches respectively. Additionally, a two-dimensional morphological analysis, based on the bathymetric data, suggested a loss of profile complexity from 2004 to 2015. Causal relationships with natural and anthropogenic stressors are yet to be established. The methodologies presented and discussed are repeatable and can be applied to broad-scale geographical extents given that broad-scale time series datasets become available.
Anatomy of a Flash Flood in the Amargosa Desert, U.S.A.
NASA Astrophysics Data System (ADS)
Stonestrom, D. A.; Prudic, D. E.; Glancy, P. A.; Beck, D. A.
2004-12-01
In August 2004, intense convective rainstorms caused flash flooding throughout the Amargosa River drainage network, temporarily closing Death Valley National Park and causing two fatalities when runoff from Furnace Creek and other channels overtopped roadways in the Park. In 1998, we began installing streambed temperature loggers, pressure transducers, and scour chains in the normally dry channel and selected tributaries of the river in the Amargosa Desert and Oasis Valley. The primary objective of this work is to improve understanding of ground-water recharge from ephemeral streamflows under current climatic conditions. Two weeks after the flash flooding, we visited instrumented sites and estimated peak flows by surveying high-water marks and corresponding channel geometries. Time series of temperatures and stages, together with peak-flow estimates, reveal the routing and evolution of distinct flood pulses in the upper Amargosa River basin. The data also reveal previously undocumented details of individual flash-flood hydrographs, including initial and subsequent flood pulses at two sites. Arid environments are prone to flash flooding not only because vegetation is sparse, but also because the surface-water network is decoupled from underlying ground water by a thick unsaturated zone. Nonlinear interactions between runoff (with energy potentials on the order of a meter of head) and the unsaturated zone (with energy potentials on the order of negative hundreds of meters of head) keep advancing fronts of flood pulses sharp. Profiles of water content beneath the main channel before and after the passage of a flood pulse, together with down-channel attenuation of flow volume within individual pulses, show the leaky nature of dry alluvial channels and the efficiency at which flash floods become potential recharge.
Interactions of Estuarine Shoreline Infrastructure With Multiscale Sea Level Variability
NASA Astrophysics Data System (ADS)
Wang, Ruo-Qian; Herdman, Liv M.; Erikson, Li; Barnard, Patrick; Hummel, Michelle; Stacey, Mark T.
2017-12-01
Sea level rise increases the risk of storms and other short-term water-rise events, because it sets a higher water level such that coastal surges become more likely to overtop protections and cause floods. To protect coastal communities, it is necessary to understand the interaction among multiday and tidal sea level variabilities, coastal infrastructure, and sea level rise. We performed a series of numerical simulations for San Francisco Bay to examine two shoreline scenarios and a series of short-term and long-term sea level variations. The two shoreline configurations include the existing topography and a coherent full-bay containment that follows the existing land boundary with an impermeable wall. The sea level variability consists of a half-meter perturbation, with duration ranging from 2 days to permanent (i.e., sea level rise). The extent of coastal flooding was found to increase with the duration of the high-water-level event. The nonlinear interaction between these intermediate scale events and astronomical tidal forcing only contributes ˜1% of the tidal heights; at the same time, the tides are found to be a dominant factor in establishing the evolution and diffusion of multiday high water events. Establishing containment at existing shorelines can change the tidal height spectrum up to 5%, and the impact of this shoreline structure appears stronger in the low-frequency range. To interpret the spatial and temporal variability at a wide range of frequencies, Optimal Dynamic Mode Decomposition is introduced to analyze the coastal processes and an inverse method is applied to determine the coefficients of a 1-D diffusion wave model that quantify the impact of bottom roughness, tidal basin geometry, and shoreline configuration on the high water events.
Streamflow and streambed scour in 2010 at bridge 339, Copper River, Alaska
Conaway, Jeffrey S.; Brabets, Timothy P.
2011-01-01
The distribution of the Copper River's discharge through the bridges was relatively stable until sometime between 1969-70 and 1982-85. The majority of the total Copper River discharge in 1969-70 passed through three bridges on the western side of the delta, but by 1982-1985, 25 to 62 percent of the flow passed through bridge 342 on the eastern side of the Copper River Delta. In 2004, only 8 percent of the flow passed through the western bridges, while 90 percent of the discharge flowed through two bridges on the eastern side of the delta. Migration of the river across the delta and redistribution of discharge has resulted in streambed scour at some bridges, overtopping of the road during high flows, prolonged highway closures, and formation of new channels through forests. Scour monitoring at the eastern bridges has recorded as much as 44 feet of fill at one pier and 33 feet of scour at another. In 2009, flow distribution began to shift from the larger bridge 342 to bridge 339. In 2010, flow in excess of four times the design discharge scoured the streambed at bridge 339 to a level such that constant on-site monitoring was required to evaluate the potential need for bridge closure. In 2010, instantaneous flow through bridge 339 was never less than 30 percent and was as high as 49 percent of the total Copper River discharge. The percentage of flow through bridge 339 decreased when the overall Copper River discharge increased. The increased discharge through bridge 339 is attributed to a shift in the approach channel 3,500 feet upstream. Bridge channel alignment and analysis of flow distribution as of October 2010 indicate these hydrologic hazards will persist in 2011.
Song, Donald L.; Ivanoff, Michael A.
1996-01-01
Total scour at a highway crossing is comprised of three components: 1) long-term aggradation or degradation; 2) contraction scour (due to reduction in flow area caused by a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute scour depths for contraction and local scour and a summary of the results follows. Contraction scour for all modelled flows ranged from 1.9 ft to 4.6 ft and the worst-case contraction scour occurred at the incipient overtopping discharge. Abutment scour ranged from 4.0 ft to 22.5 ft and the worst-case abutment scour occurred at the 500-year discharge. Scour depths and depths to armoring are summarized on p. 14 in the section titled “Scour Results”. Scour elevations, based on the calculated depths are presented in tables 1 and 2; a graph of the scour elevations is presented in figure 8 Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. For all scour presented in this report, “the scour depths adopted [by VTAOT] may differ from the equation values based on engineering judgement” (Richardson and others, 1993, p. 21, 27). It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1993, p. 48). Many factors, including historical performance during flood events, the geomorphic assessment, and the results of the hydraulic analyses, must be considered to properly assess the validity of abutment scour results.
Modeling Reef Island Morphodynamics in Profile and Plan View
NASA Astrophysics Data System (ADS)
Ashton, A. D.; Ortiz, A. C.; Lorenzo-Trueba, J.
2016-12-01
Reef islands are carbonate detrital landforms perched atop shallow reef flats of atolls and barrier reef systems. Often comprising the only subaerial, inhabitable land of many island chains and island nations, these low-lying, geomorphically active landforms face considerable hazards from climate change. While there hazards include wave overtopping and groundwater salinization, sea-level rise and wave climate change will affect sediment transport and shoreline dynamics, including the possibility for wholesale reorganization of the islands themselves. Here we present a simplified morphodynamic model that can spatially quantify the potential impacts of climate change on reef islands. Using parameterizations of sediment transport pathways and feedbacks from previously presented XBeach modeling results, we investigate how sea-level rise, change in storminess, and different carbonate production rates can affect the profile evolution of reef islands, including feedbacks with the shallow reef flat that bounds the islands offshore (and lagoonward). Model results demonstrate that during rising sea levels, the reef flat can serve as a sediment trap, starving reef islands of detrital sediment that could otherwise fortify the shore against sea-level-rise-driven erosion. On the other hand, if reef flats are currently shallow (likely due to geologic inheritance or biologic cementation processes) such that sea-level rise does not result in sediment accumulation on the flat, reef island shorelines may be more resilient to rising seas. We extend the model in plan view to examine how long-term (decadal) changes in wave approach direction could affect reef island shoreline orientation. We compare model results to historical and geologic change for different case studies on the Marshall Islands. This simplified modeling approach, focusing on boundary dynamics and mass fluxes, provides a quantitative tool to predict the response of reef island environments to climate change.
NASA Astrophysics Data System (ADS)
Cheriton, O. M.; Storlazzi, C. D.; Rosenberger, K. J.
2016-02-01
Low-lying, reef-fringed islands are susceptible to sea-level rise and often subjected to overwash and flooding during large wave events. To quantify wave dynamics and wave-driven water levels on fringing coral reefs, wave gauges and a current meter were deployed for 5 months across two shore-normal transects on Roi-Namur, an atoll island in the Republic of the Marshall Islands. These observations captured two large wave events that had maximum wave heights greater than 6 m and peak periods of 16 s over the fore reef. The larger event coincided with a peak spring tide, leading to energetic, highly-skewed infragravity (0.04-0.004 Hz) and very low frequency (0.004-0.001 Hz) waves at the shoreline, which reached heights of 1.0 and 0.7 m, respectively. Water surface elevations, combined with wave runup, exceeded 3.7 m at the innermost reef flat adjacent to the toe of the beach, resulting in flooding of inland areas. This overwash occurred during a 3-hr time window that coincided with high tide and maximum low-frequency reef flat wave heights. The relatively low-relief characteristics of this narrow reef flat may further drive shoreline amplification of low-frequency waves due to resonance modes. These results demonstrate how the coupling of high offshore water levels with low-frequency reef flat wave energetics can lead to large impacts along atoll and fringing reef-lined shorelines, such as island overwash. These observations lend support to the hypothesis that predicted higher sea levels will lead to more frequent occurrences of both extreme shoreline runup and island overwash, threatening the sustainability of these islands.
Processes controlling the retreat of the Isles Dernieres, a Louisiana barrier-island chain
Dingler, John R.; Reiss, Thomas E.
1991-01-01
The Isles Dernieres is a low-lying, transgressive barrier-island chain situated about 150 km west of the modern Mississippi delta. Much of the Isles Dernieres consists of highly dissected salt-marsh muds that lie at or slightly above sea level and are covered by a veneer of sand along the shoreline facing the Gulf of Mexico. Maximum berm elevations are generally less than 1.5 m above mean sea level. Since the mid-1800s, the initial island has been fragmented into four islands, and the beach face has retreated landward at a rate of more than 10 m/yr. The dominant processes controlling degradation of the chain are cold fronts that pass through the area several times each year and occasional hurricanes. Beach surveys over a 2-year period on the Isles Dernieres document irreversible beach-face retreat in conjunction with multiple cold fronts and one major hurricane (Gilbert). Although both the hurricane and the cold fronts caused the island to erode, the erosional patterns of the two storm types differed from each other. During the two years, over 60 cold fronts collectively caused about 37 m of beach-face retreat, whereas Gilbert itself produced more than 40 m of retreat. A major difference between the two storm types was in the percentage of washover sand produced by each. Commonly, the cold fronts did not create enough of a storm surge to overtop the berm, so most of the material removed from the beach face must have moved offshore or alongshore. Gilbert, in contrast, inundated the study site, and essentially all the sand removed from the beach face moved to the backshore.
Magirl, Christopher S.; Keith, Mackenzie K.; Anderson, Scott W.; O'Connor, Jim; Robert Aldrich,; Mastin, Mark C.
2015-12-28
On March 22, 2014, the State Route 530 Landslide near Oso, Washington, traveled almost 2 kilometers (km), destroyed more than 40 structures, and impounded the North Fork Stillaguamish River to a depth of 8 meters (m) and volume of 3.3×106 cubic meters (m3). The landslide killed 43 people. After overtopping and establishing a new channel through the landslide, the river incised into the landslide deposit over the course of 10 weeks draining the impoundment lake and mobilizing an estimated 280,000±56,000 m3 of predominantly sand-sized and finer sediment. During the first 4 weeks after the landslide, this eroded sediment caused downstream riverbed aggradation of 1–2 m within 1 km of the landslide and 0.4 m aggradation at Whitman Road Bridge, 3.5 km downstream. Winter high flows in 2014–15 were anticipated to mobilize an additional 220,000±44,000 m3 of sediment, potentially causing additional aggradation and exacerbating flood risk downstream of the landslide. Analysis of unit stream power and bed-material transport capacity along 35 km of the river corridor indicated that most fine-grained sediment will transport out of the North Fork Stillaguamish River, although some localized additional aggradation was possible. This new aggradation was not likely to exceed 0.1 m except in reaches within a few kilometers downstream of the landslide, where additional aggradation of up to 0.5 m is possible. Alternative river response scenarios, including continued mass wasting from the landslide scarp, major channel migration or avulsion, or the formation of large downstream wood jams, although unlikely, could result in reaches of significant local aggradation or channel change.
NASA Astrophysics Data System (ADS)
Owen, Damon; Viavattene, Christophe; Priest, Sally; Micou, Paula; Parker, Dennis
2015-04-01
Recent and historic low-frequency, high-impact events (Xynthia, Ligurian Flash Floods, the 1953 North Sea storm surge etc) have demonstrated the flood risks faced by exposed coastal areas in Europe. The hazard probability is likely to increase due to a changing climate with more frequent and violent instances of surge-driven floods, wind damage, erosion, overtopping and rain-driven flash flooding. The number and value of receptors in the coastal area also increases due to continued economic development and population growth. As part of the FP7 EU RISCKIT (Resilience-Increasing Strategies for Coasts toolkit) project, a coastal vulnerability indicator library has been produced incorporating ecosystems, built environment, human population, critical infrastructure and the overall characteristics of the coastal system. The library will include data at European, national and local levels and will be gathered, in large part, through a multitude of interviews with various members of the coastal community at 11 case study sites across Europe. The presentation will give a brief outline of the challenges in developing vulnerability indicators - particularly for countries where specific data is limited or lacking - and how the library will be organised to facilitate the use of the data. Finally, the presentation will describe how the vulnerability library will feed into a Coastal Risk Assessment Framework (CRAF). The CRAF will evaluate coastal risk at regional scale and identify "hot spots" to assist coastal practitioners to choose the best prevention, mitigation and preparedness measures for their coast. The work described in this abstract was supported by the European Community's 7th Framework Programme through the grant to the budget of RISC-KIT, contract no. 603458, and by contributions by the partner institutes.
NASA Astrophysics Data System (ADS)
Brill, Dominik; May, Simon Matthias; Engel, Max; Reyes, Michelle; Pint, Anna; Opitz, Stephan; Dierick, Manuel; Gonzalo, Lia Anne; Esser, Sascha; Brückner, Helmut
2016-12-01
On 8 November 2013, category 5 Supertyphoon Haiyan made landfall on the Philippines. During a post-typhoon survey in February 2014, Haiyan-related sand deposition and morphological changes were documented at four severely affected sites with different exposure to the typhoon track and different geological and geomorphological settings. Onshore sand sheets reaching 100-250 m inland are restricted to coastal areas with significant inundation due to amplification of surge levels in embayments or due to accompanying long-wave phenomena at the most exposed coastlines of Leyte and Samar. However, localized washover fans with a storm-typical laminated stratigraphy occurred even along coasts with limited inundation due to waves overtopping or breaching coastal barriers. On a recent reef platform off Negros in the Visayan Sea, storm waves entrained coral rubble from the reef slope and formed an intertidal coral ridge several hundreds of metres long when breaking at the reef edge. As these sediments and landforms were generated by one of the strongest storms ever recorded, they not only provide a recent reference for typhoon signatures that can be used for palaeotempestological and palaeotsunami studies in the region but might also increase the general spectrum of possible cyclone deposits. Although a rather atypical example for storm deposition due to the influence of infra-gravity waves, it nevertheless provides a valuable reference for an extreme case that should be considered when discriminating between storm and tsunami deposits in general. Even for sites with low topography and high inundation levels during Supertyphoon Haiyan, the landward extent of the documented sand sheets seems significantly smaller than typical sand sheets of large tsunamis. This criterion may potentially be used to distinguish both types of events.
NASA Technical Reports Server (NTRS)
Milesi, Cristina; Costa-Cabral, Mariza; Rath, John; Mills, William; Roy, Sujoy; Thrasher, Bridget; Wang, Weile; Chiang, Felicia; Loewenstein, Max; Podolske, James
2014-01-01
Water resource managers planning for the adaptation to future events of extreme precipitation now have access to high resolution downscaled daily projections derived from statistical bias correction and constructed analogs. We also show that along the Pacific Coast the Northern Oscillation Index (NOI) is a reliable predictor of storm likelihood, and therefore a predictor of seasonal precipitation totals and likelihood of extremely intense precipitation. Such time series can be used to project intensity duration curves into the future or input into stormwater models. However, few climate projection studies have explored the impact of the type of downscaling method used on the range and uncertainty of predictions for local flood protection studies. Here we present a study of the future climate flood risk at NASA Ames Research Center, located in South Bay Area, by comparing the range of predictions in extreme precipitation events calculated from three sets of time series downscaled from CMIP5 data: 1) the Bias Correction Constructed Analogs method dataset downscaled to a 1/8 degree grid (12km); 2) the Bias Correction Spatial Disaggregation method downscaled to a 1km grid; 3) a statistical model of extreme daily precipitation events and projected NOI from CMIP5 models. In addition, predicted years of extreme precipitation are used to estimate the risk of overtopping of the retention pond located on the site through simulations of the EPA SWMM hydrologic model. Preliminary results indicate that the intensity of extreme precipitation events is expected to increase and flood the NASA Ames retention pond. The results from these estimations will assist flood protection managers in planning for infrastructure adaptations.
Ryan, Holly F.; Draut, Amy E.; Keranen, Katie M.; Scholl, David W.
2012-01-01
During Pliocene to Quaternary time, the central Aleutian forearc basin evolved in response to a combination of tectonic and climatic factors. Initially, along-trench transport of sediment and accretion of a frontal prism created the accommodation space to allow forearc basin deposition. Transport of sufficient sediment to overtop the bathymetrically high Amlia fracture zone and reach the central Aleutian arc began with glaciation of continental Alaska in the Pliocene. As the obliquely subducting Amlia fracture zone swept along the central Aleutian arc, it further affected the structural evolution of the forearc basins. The subduction of the Amlia fracture zone resulted in basin inversion and loss of accommodation space east of the migrating fracture zone. Conversely, west of Amlia fracture zone, accommodation space increased arcward of a large outer-arc high that formed, in part, by a thickening of arc basement. This difference in deformation is interpreted to be the result of a variation in interplate coupling across the Amlia fracture zone that was facilitated by increasing subduction obliquity, a change in orientation of the subducting Amlia fracture zone, and late Quaternary intensification of glaciation. The change in coupling is manifested by a possible tear in the subducting slab along the Amlia fracture zone. Differences in coupling across the Amlia fracture zone have important implications for the location of maximum slip during future great earthquakes. In addition, shaking during a great earthquake could trigger large mass failures of the summit platform, as evidenced by the presence of thick mass transport deposits of primarily Quaternary age that are found in the forearc basin west of the Amlia fracture zone.
Depth of penetration of a 785nm wavelength laser in food powders
NASA Astrophysics Data System (ADS)
Chao, Kuanglin; Dhakal, Sagar; Qin, Jianwei; Kim, Moon S.; Peng, Yankun; Schmidt, Walter F.
2015-05-01
Raman spectroscopy is a useful, rapid, and non-destructive method for both qualitative and quantitative evaluation of chemical composition. However it is important to measure the depth of penetration of the laser light to ensure that chemical particles at the very bottom of a sample volume is detected by Raman system. The aim of this study was to investigate the penetration depth of a 785nm laser (maximum power output 400mw) into three different food powders, namely dry milk powder, corn starch, and wheat flour. The food powders were layered in 5 depths between 1 and 5 mm overtop a Petri dish packed with melamine. Melamine was used as the subsurface reference material for measurement because melamine exhibits known and identifiable Raman spectral peaks. Analysis of the sample spectra for characteristics of melamine and characteristics of milk, starch and flour allowed determination of the effective penetration depth of the laser light in the samples. Three laser intensities (100, 200 and 300mw) were used to study the effect of laser intensity to depth of penetration. It was observed that 785nm laser source was able to easily penetrate through every point in all three food samples types at 1mm depth. However, the number of points that the laser could penetrate decreased with increasing depth of the food powder. ANOVA test was carried out to study the significant effect of laser intensity to depth of penetration. It was observed that laser intensity significantly influences the depth of penetration. The outcome of this study will be used in our next phase of study to detect different chemical contaminants in food powders and develop quantitative analysis models for detection of chemical contaminants.
Johnson, K.G.; Quinones-Marquez, Ferdinand; Gonzalez, Ralph
1987-01-01
The magnitude, frequency and extent of the flood of October 7, 1985 at the Rio Coamo in the vicinity of the Coamo Dam and Highway 52 bridge in southern Puerto Rico, were investigated. The observed flood profiles were used to calibrate a step-backwater model. The calibrated model was then used to investigate several alternative flow conditions in the vicinity of the bridge. The peak discharge of the flood at the Highway 52 bridge was 72,000 cu ft/sec. This peak discharge was determined from the peak computed at a reach in the vicinity of the Banos de Coamo, about 1.2 mi upstream from the bridge. The computed discharge at the Banos de Coamo of 66,000 cu ft/sec was adjusted to the dam and bridge location by multiplying it by the ratio of the drainage areas raised to the 0.83 power. The flood had a recurrence interval of about 100 yr, exceeding all previously known floods at the site. The flood overtopped the spillway and levee of the Coamo Dam just upstream of Highway 52. The flow over the spillway was 54,000 cu ft/sec. Flow over the levee was about 18,000 cu ft/sec. About 10,000 cu ft/sec of the flow over the levee returned to the main channel at the base of the embankment at the northeast approach to the bridge. The remaining 8,000 cu ft/sec flowed south through the underpass on Highway 153. The embankment and shoulder on the northern span of the bridge were eroded with the eventual collapse of the approach slab. (Author 's abstract)
Study of a Novel Oscillating Surge Wave Energy Converter: Preprint
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tom, Nathan M; Choiniere, Michael; Thiagarajan, Krish P.
This study investigates the performance of an oscillating surge wave energy converter (OSWEC) that utilizes adjustable geometry as a means of controlling the hydrodynamic coefficients, a concept originally proposed by [1]. The body of the device consists of a bottom-hinged solid rectangular frame with five horizontal flaps spanning the interior of the frame. The flaps can rotate independently about their center of rotation within the frame like a large window shutter. Changing the orientation of the flaps alters the hydrodynamic coefficients and natural frequency of the device as well as the ability to shed or absorb structural loads accordingly. Thismore » ability may allow the device to operate in a wider range of sea states than other current wave energy converter designs. This paper presents and compares the results of numerical simulations and experimental testing of the OSWEC's response to regular waves with all five of the horizontal fin configurations sharing the same orientation of 0 degrees (fully closed interior) and 90 degrees (fully open). The numerical simulations were performed using WAMIT, which calculates hydrodynamic coefficients using a boundary element method code to solve the linear potential flow problem, and WEC-Sim, a MATLAB-based tool that simulates multibody devices in the time domain by solving the governing equations of motion. A 1:14 scale model of the device was built for experimental evaluation in an 8-m-long, 1-m wide wave tank, which supports a water depth of 0.7 m. The OSWEC motion in different wave conditions was measured with displacement sensors while nonlinear wave-structure interaction effects like slamming and overtopping were captured using a high-speed camera and used to understand differences between the simulation and experiments.« less
NASA Astrophysics Data System (ADS)
Abarca, Elena; Karam, Hanan; Hemond, Harold F.; Harvey, Charles F.
2013-05-01
Detailed field measurements are combined with a numerical modeling to characterize the groundwater dynamics beneath the discharge zone at Waquoit Bay, Massachusetts. Groundwater salinity values revealed a saline circulation cell that overlaid the discharging freshwater and grew and disappeared with the lunar cycle. The cell was initiated by a greater bay water infiltration during the new moon when high tides overtopped the mean high-tide mark, flooding the flatter beach berm and inundating a larger area of the beach. The dynamics of this cell were further characterized by a tracer test and by constructing a density-dependent flow model constrained to salinity and head data. The numerical model captured the growing and diminishing behavior of the circulation cell and provided the estimates of freshwater and saline water fluxes and travel times. Furthermore, the model enabled quantification of the relationship between the characteristics of the observed tidal cycle (maximum, minimum, and mean tidal elevations) and the different components of the groundwater circulation (freshwater discharge, intertidal saline cycling, and deep saline cycling). We found that (1) recharge to the intertidal saline cell is largely controlled by the high-tide elevation; (2) freshwater discharge is positively correlated to the low-tide elevation, whereas deep saline discharge from below the discharging freshwater is negatively correlated to the low-tide elevation. So, when the low-tide elevation is relatively high, more freshwater discharges and less deep saltwater discharges. In contrast when low tides are very low, less freshwater discharges and more deep salt water discharges; (3) offshore inflow of saline water is largely insensitive to tides and the lunar cycle.
Experimental canopy removal enhances diversity of vernal pond amphibians.
Skelly, David K; Bolden, Susan R; Freidenburg, L Kealoha
2014-03-01
Vernal ponds are often treated as protected environments receiving special regulation and management. Within the landscapes where they are found, forest vegetation frequently dominates surrounding uplands and can grow to overtop and shade pond basins. Two bodies of research offer differing views of the role of forest canopy for vernal pond systems. Studies of landscape conversion suggest that removing forest overstory within uplands can cause local extinctions of amphibians by altering terrestrial habitat or hindering movement. Studies of canopy above pond basins imply an opposite relationship; encroachment of overstory vegetation can be associated with local extinctions potentially via changes in light, thermal, and food resource environments. Unresolved uncertainties about the role of forest canopy reveal significant gaps in our understanding of wetland species distributions and dynamics. Any misunderstanding of canopy influences is simultaneously important to managers because current practices emphasize promoting or conserving vegetation growth particularly within buffers immediately adjacent to ponds. We evaluated this apparent contradiction by conducting a landscape-scale, long-term experiment using 14 natural vernal ponds. Tree felling at six manipulated ponds was limited in spatial scope but was nevertheless effective in increasing water temperature. Compared with eight control ponds, manipulated ponds maintained more amphibian species during five years post-manipulation. There was little evidence that any species was negatively influenced, and the reproductive effort of species for which we estimated egg inputs maintained pretreatment population densities in manipulated compared with control ponds. Overall, our experiment shows that a carefully circumscribed reduction of overhead forest canopy can enhance the capacity of vernal ponds to support wildlife diversity and suggests a scale dependence of canopy influences on amphibians. These findings have implications for the connection between current wetland management practices and the goals of wetland stewardship and conservation of wetland-dependent species.
NASA Astrophysics Data System (ADS)
Chuang, Wei-Liang; Chang, Kuang-An; Mercier, Richard
2018-06-01
Green water kinematics and dynamics due to wave impingements on a simplified geometry, fixed platform were experimentally investigated in a large, deep-water wave basin. Both plane focusing waves and random waves were employed in the generation of green water. The focusing wave condition was designed to create two consecutive plunging breaking waves with one impinging on the frontal vertical wall of the fixed platform, referred as wall impingement, and the other directly impinging on the deck surface, referred as deck impingement. The random wave condition was generated using the JONSWAP spectrum with a significant wave height approximately equal to the freeboard. A total of 179 green water events were collected in the random wave condition. By examining the green water events in random waves, three different flow types are categorized: collapse of overtopping wave, fall of bulk water, and breaking wave crest. The aerated flow velocity was measured using bubble image velocimetry, while the void fraction was measured using fiber optic reflectometry. For the plane focusing wave condition, measurements of impact pressure were synchronized with the flow velocity and void fraction measurements. The relationship between the peak pressures and the pressure rise times is examined. For the high-intensity impact in the deck impingement events, the peak pressures are observed to be proportional to the aeration levels. The maximum horizontal velocities in the green water events in random waves are well represented by the lognormal distribution. Ritter's solution is shown to quantitatively describe the green water velocity distributions under both the focusing wave condition and the random wave condition. A prediction equation for green water velocity distribution under random waves is proposed.
Honu, Y.A.K.; Gibson, D.J.; Middleton, B.A.
2006-01-01
Soil nutrients and disturbance are two of the main abiotic factors that influence plant dominance (canopy cover), density, and fecundity in early successional old field plant communities. The manner in which the dominant species in old field successional systems respond to the interaction of nutrients and disturbance is poorly known. We examined the dominance, density of flowering tillers, and reproductive output of Tridens flavus, a perennial, warm-season bunchgrass that is important in old field succession, to varying soil nutrient and disturbance regimes. We tested the hypothesis that the interaction between nutrients and disturbance would influence the performance (cover, density, fecundity) of T. flavus. To test this hypothesis, we subjected 25 m2 experimental plots to various combinations of fertilizer and mowing treatments for eight years after initially plowing the field. The performance of T. flavus was measured by estimating percent cover for 8 years (1996-2003) and both density of flowering tillers and reproductive output (panicle length and number of branches per panicle) for three years (2001-2003). The pattern of canopy cover of T. flavus over the first eight years of succession varied over time depending on mowing regime. Dominance was significantly higher in plots that were fertilized only in years one and five than in annually fertilized and unfertilized control plots. The length of panicles and density of flowering tillers were both significantly greater in annually mowed plots than in unmowed plots. In the absence of mowing in particular, T. flavus became overtopped by woody species and declined in this old field community. Therefore, disturbances such as mowing and fertilization may be important in maintaining grasses such as Tridens flavus in old fields.
Pearthree, Philip; House, P. Kyle
2014-01-01
Geologic investigations of late Miocene–early Pliocene deposits in Mohave and Cottonwood valleys provide important insights into the early evolution of the lower Colorado River system. In the latest Miocene these valleys were separate depocenters; the floor of Cottonwood Valley was ∼200 m higher than the floor of Mohave Valley. When Colorado River water arrived from the north after 5.6 Ma, a shallow lake in Cottonwood Valley spilled into Mohave Valley, and the river then filled both valleys to ∼560 m above sea level (asl) and overtopped the bedrock divide at the southern end of Mohave Valley. Sediment-starved water spilling to the south gradually eroded the outlet as siliciclastic Bouse deposits filled the lake upstream. When sediment accumulation reached the elevation of the lowering outlet, continued erosion of the outlet resulted in recycling of stored lacustrine sediment into downstream basins; depth of erosion of the outlet and upstream basins was limited by the water levels in downstream basins. The water level in the southern Bouse basin was ∼300 m asl (modern elevation) at 4.8 Ma. It must have drained and been eroded to a level <150 m asl soon after that to allow for deep erosion of bedrock divides and basins upstream, leading to removal of large volumes of Bouse sediment prior to massive early Pliocene Colorado River aggradation. Abrupt lowering of regional base level due to spilling of a southern Bouse lake to the Gulf of California could have driven observed upstream river incision without uplift. Rapid uplift of the entire region immediately after 4.8 Ma would have been required to drive upstream incision if the southern Bouse was an estuary.
Hinkel, Kenneth M.; Jones, Benjamin M.; Eisner, Wendy R.; Cuomo, Chris J.; Beck, R.A.; Frohn, R.
2007-01-01
Thousands of lakes are found on the Arctic Coastal Plain of northern Alaska and northwestern Canada. Developed atop continuous permafrost, these thaw lakes and associated drained thaw lake basins are the dominant landscape elements and together cover 46% of the 34,570 km2western Arctic Coastal Plain (WACP). Lakes drain by a variety of episodic processes, including coastal erosion, stream meandering, and headward erosion, bank overtopping, and lake coalescence. Comparison of Landsat multispectral scanner (MSS) imagery from the mid-1970s to Landsat 7 enhanced thematic mapper (ETM+) imagery from around 2000 shows that 50 lakes completely or partially drained over the approximately 25 year period, indicating landscape stability. The lake-specific drainage mechanism can be inferred in some cases and is partially dependant on geographic settings conducive to active erosion such as riparian and coastal zones. In many cases, however, the cause of drainage is unknown. The availability of high-resolution aerial photographs for the Barrow Peninsula extends the record back to circa 1950; mapping spatial time series illustrates the dynamic nature of lake expansion, coalescence, and drainage. Analysis of these historical images suggests that humans have intentionally or inadvertently triggered lake drainage near the village of Barrow. Efforts to understand landscape processes and identify events have been enhanced by interviewing Iñupiaq elders and others practicing traditional subsistence lifestyles. They can often identify the year and process by which individual lakes drained, thereby providing greater dating precision and accuracy in assessing the causal mechanism. Indigenous knowledge has provided insights into events, landforms, and processes not previously identified or considered.
Performance of the Multi-Radar Multi-Sensor System over the Lower Colorado River, Texas
NASA Astrophysics Data System (ADS)
Bayabil, H. K.; Sharif, H. O.; Fares, A.; Awal, R.; Risch, E.
2017-12-01
Recently observed increases in intensities and frequencies of climate extremes (e.g., floods, dam failure, and overtopping of river banks) necessitate the development of effective disaster prevention and mitigation strategies. Hydrologic models can be useful tools in predicting such events at different spatial and temporal scales. However, accuracy and prediction capability of such models are often constrained by the availability of high-quality representative hydro-meteorological data (e.g., precipitation) that are required to calibrate and validate such models. Improved technologies and products such as the Multi-Radar Multi-Sensor (MRMS) system that allows gathering and transmission of vast meteorological data have been developed to provide such data needs. While the MRMS data are available with high spatial and temporal resolutions (1 km and 15 min, respectively), its accuracy in estimating precipitation is yet to be fully investigated. Therefore, the main objective of this study is to evaluate the performance of the MRMS system in effectively capturing precipitation over the Lower Colorado River, Texas using observations from a dense rain gauge network. In addition, effects of spatial and temporal aggregation scales on the performance of the MRMS system were evaluated. Point scale comparisons were made at 215 gauging locations using rain gauges and MRMS data from May 2015. Moreover, the effects of temporal and spatial data aggregation scales (30, 45, 60, 75, 90, 105, and 120 min) and (4 to 50 km), respectively on the performance of the MRMS system were tested. Overall, the MRMS system (at 15 min temporal resolution) captured precipitation reasonably well, with an average R2 value of 0.65 and RMSE of 0.5 mm. In addition, spatial and temporal data aggregations resulted in increases in R2 values. However, reduction in RMSE was achieved only with an increase in spatial aggregations.
The Role of Porosity in the Formation of Coastal Boulder Deposits - Hurricane Versus Tsunami
NASA Astrophysics Data System (ADS)
Spiske, M.; Boeroecz, Z.; Bahlburg, H.
2007-12-01
Coastal boulder deposits are a consequence of high-energy wave impacts, such as storms, hurricanes or tsunami. Distinguishing parameters between storm, hurricane and tsunami origin are distance of a deposit from the coast, boulder weight and inferred wave height. Formulas to calculate minimum wave heights of both storm and tsunami waves depend on accurate determination of boulder dimensions and lithology from the respective deposits. At present however, boulder porosity appears to be commonly neglected, leading to significant errors in determined bulk density, especially when boulders consist of reef or coral limestone. This limits precise calculations of wave heights and hampers a clear distinction between storm, hurricane and tsunami origin. Our study uses Archimedean and optical 3D-profilometry measurements for the determination of porosities and bulk densities of reef and coral limestone boulders from the islands of Aruba, Bonaire and Curaçao (ABC Islands, Netherlands Antilles). Due to the high porosities (up to 68 %) of the enclosed coral species, the weights of the reef rock boulders are as low as 20 % of previously calculated values. Hence minimum calculated heights both for tsunami and hurricane waves are smaller than previously proposed. We show that hurricane action appears to be the likely depositional mechanism for boulders on the ABC Islands, since 1) our calculations result in tsunami wave heights which do not permit the overtopping of coastal platforms on the ABC Islands, 2) boulder fields lie on the windward (eastern) sides of the islands, 3) recent hurricanes transported boulders up to 35 m3 and 4) the scarcity of tsunami events affecting the coasts of the ABC Islands compared to frequent impacts of tropical storms and hurricanes.
Habitat assessment, Missouri River at Hermann, Missouri
Jacobson, Robert B.; Laustrup, Mark S.; Reuter, Joanna M.
2002-01-01
This report documents methods and results of aquatic habitat assessment in the Missouri River near Hermann, Missouri. The assessment is intended to improve understanding of spatial and temporal variability of aquatic habitat, including habitats thought to be critical for the endangered pallid sturgeon (Scaphirhynchus albus). Physical aquatic habitat - depth, velocity, and substrate - was assessed around 9 wing dikes and adjacent to the U.S. Route 19 bridge, at discharges varying from 44,000 cubic feet per second (cfs) to 146, 000 cfs during August 2000-May, 2001. For the river as a whole, velocities are bi-modally distributed with distinct peaks relating to navigation channel and wing-dike environments. Velocities predictably showed an increasing trend with increasing discharge. Substrate within wing dikes was dominated by mud at low discharges, whereas the navigation channel had patches of transporting sand, rippled sand, and coarse sand. Discharges that overtopped the wing dikes (about 93,000 cfs, March 2001) were associated with increases of patchy sand, rippled sand, and coarse sand within the wing dikes. When flows were substantially over the wing dikes (146,000 cfs, May 2001) substrates within most wing dikes showed substantial reorganization and coarsening. The habitat assessment provides a geospatial database that can be used to query wing dikes for distributions of depth, velocity, and substrate for comparison with fish samples collected by US Fish and Wildlife Service biologists (Grady and others, 2001). In addition, the assessment documented spatial and temporal variation in habitat within the Hermann reach and over a range of discharges. Measurable geomorphic change--alteration of substrate conditions plus substantial erosion and deposition--was associated with flows equaled or exceeded 12-40% of the time (40-140 days per year). Documented geomorphic change associated with high-frequency flows underscores the natural temporal variability of physical habitat in the Lower Missouri River.
Wild, Emily C.; Medalie, Laura
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure SHEFTH00440019 on Town Highway 44 crossing Trout Brook, Sheffield, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the White Mountain section of the New England physiographic province in northeastern Vermont. The 3.0-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is grass on the upstream and downstream right overbanks, while the immediate banks have dense woody vegetation. The surface cover of the upstream and downstream left overbanks is shrub and brushland. In the study area, Trout Brook has an incised, sinuous channel with a slope of approximately 0.03 ft/ft, an average channel top width of 45 ft and an average bank height of 6 ft. The channel bed material ranges from sand to boulder with a median grain size (D50) of 116 mm (0.381 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 31, 1995, indicated that the reach was stable. The Town Highway 44 crossing of Trout Brook is a 24-ft-long, one-lane bridge consisting of a 22-foot steel-stringer span (Vermont Agency of Transportation, written communication, March 28, 1994). The opening length of the structure parallel to the bridge face is 19.8 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 10 degrees to the opening while the opening-skew-to-roadway is zero degrees. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge was analyzed since it has the potential of being the worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows resulted in zero ft. Left abutment scour ranged from 4.4 to 5.6 ft. The worst-case left abutment scour occurred at the 500-year discharge. Right abutment scour ranged from 3.6 to 4.8 ft. The worst-case right abutment scour occurred at the incipient roadway-overtopping discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particlesize distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Burns, Ronda L.; Degnan, James R.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure HUNTTH00220033 on Town Highway 22 crossing Brush Brook, Huntington, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in central Vermont. The 8.65-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest except on the downstream right overbank which is pasture. In the study area, Brush Brook has an incised, straight channel with a slope of approximately 0.04 ft/ft, an average channel top width of 42 ft and an average bank height of 3 ft. The channel bed material ranges from gravel to boulder with a median grain size (D50) of 76.7 mm (0.252 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 26, 1996, indicated that the reach was stable. The Town Highway 22 crossing of Brush Brook is a 40-ft-long, two-lane bridge consisting of one 23.5-foot concrete slab span (Vermont Agency of Transportation, written communication, November 30, 1995). The opening length of the structure parallel to the bridge face is 36.9 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 35 degrees to the opening while the opening-skew-to-roadway is 30 degrees. The scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) along the left and right banks upstream that extended through the bridge and along the downstream banks. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is analyzed since it has the potential of being the worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 1.1 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 6.5 to 14.9 ft. The worst-case abutment scour occurred at the incipient roadway-overtopping discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
NASA Astrophysics Data System (ADS)
Wang, Xianwei; Wang, Xina
2017-04-01
The coastal areas of Guangdong Province, China are susceptible to the destructions of tropical cyclones and storm surges. The projected global warming, coastal subsidence and sea level rise together will bring about greater flooding risk to these areas. The seawall and river embankment have played a significant role in mitigating and preventing the coastal low-land areas from the impairment of storm surges flooding and wave runup. However, few risk assessment studies in this region consider the existence of seawall and river embankment and often overestimate the risk and potential economic loss and population affected due to storm surge flooding. This study utilizes a hydraulic model to simulate the overtop flooding and compare those without seawall and river embankment using several specific tropic storm events and extreme events of tropic storm surges in different return periods of 2, 10, 20, 50, 100, 200 and 500 years. Most seawalls are 4 or 5 meters plus another meter of wave levee above the local mean sea level. The river embankments are usually 4 or 5 meter higher than the local mean sea level as well and decrease from the outer estuary to the inner riverine. The modeling results considering seawall and river embankments and from real storm surges are in agreement with on-site survey and observations, while those without infusing seawall and river embankments overestimate the inundation condition and economic loss. Modeling results demonstrate that seawall and river embankment greatly reduce the flooding risk and prevent the low-land area from inundation for most tropic storm events, e.g., for extreme events less than 20 to 50 years, in the coastal areas of Guangdong Province, China. However, the seawall and river embankment may also cause catastrophic disasters once there is an engineering failure of seawalls and river embankment, especially once encountering with an extreme typhoon event, e.g., the 1969 super typhoon Viola in Shantou China and the 2005 hurricane Katrina in New Orleans, USA.
Guida, Ross J; Remo, Jonathan W F; Secchi, Silvia
2016-12-01
During the latter half of the 19th Century and first half of the 20th Century, the Illinois River was heavily altered through leveeing off large portions of its floodplain, draining wetlands, and the construction of dams and river-training structures that facilitated navigation. As a result of these alterations, flood stages continue to rise, increasing flood risk and threatening to overtop levees along the La Grange Segment (LGS) of the Illinois River. Over the last two decades, more emphasis has been placed on reconnecting portions of floodplains to rivers in order to solve the long-term problem of rising flood heights attributed to continual heightening of levees to provide flood protection. Multiple studies have suggested that strategically reconnecting larger portions of the LGS could result in more sustainable floodplain management. However, the true costs and benefits of reconnecting the floodplain are not known. We use a novel hydrodynamic, geospatial, economic, and habitat suitability framework to assess the tradeoffs of strategically reconnecting the Illinois River to its floodplain in order to decrease flood risk, improve floodplain habitats, and limit the costs of reconnection. Costs include building-associated losses, lost agricultural profits, and levee removal and construction costs. Tested scenarios demonstrate that while flood heights and environmental benefits are maximized through the most aggressive levee setbacks and removals, these scenarios also have the highest costs. However, the tradeoff of implementing lower-cost scenarios is that there is less flood-height reduction and less floodplain habitat available. Several individual levee districts have high potential for reconnection based on limiting potential damages as well as providing floodplain habitat. To implement large-scale strategic floodplain reconnection, costs range from $1.2-$4.3 billion. As such, payments for ecosystem services will likely be necessary to compensate landowners for decreased long-term agricultural production and building losses that result in flood-reduction benefits and increased floodplain habitat. Copyright © 2016 Elsevier B.V. All rights reserved.
Tepley, Alan J; Thompson, Jonathan R; Epstein, Howard E; Anderson-Teixeira, Kristina J
2017-10-01
In the context of ongoing climatic warming, certain landscapes could be near a tipping point where relatively small changes to their fire regimes or their postfire forest recovery dynamics could bring about extensive forest loss, with associated effects on biodiversity and carbon-cycle feedbacks to climate change. Such concerns are particularly valid in the Klamath Region of northern California and southwestern Oregon, where severe fire initially converts montane conifer forests to systems dominated by broadleaf trees and shrubs. Conifers eventually overtop the competing vegetation, but until they do, these systems could be perpetuated by a cycle of reburning. To assess the vulnerability of conifer forests to increased fire activity and altered forest recovery dynamics in a warmer, drier climate, we characterized vegetation dynamics following severe fire in nine fire years over the last three decades across the climatic aridity gradient of montane conifer forests. Postfire conifer recruitment was limited to a narrow window, with 89% of recruitment in the first 4 years, and height growth tended to decrease as the lag between the fire year and the recruitment year increased. Growth reductions at longer lags were more pronounced at drier sites, where conifers comprised a smaller portion of live woody biomass. An interaction between seed-source availability and climatic aridity drove substantial variation in the density of regenerating conifers. With increasing climatic water deficit, higher propagule pressure (i.e., smaller patch sizes for high-severity fire) was needed to support a given conifer seedling density, which implies that projected future increases in aridity could limit postfire regeneration across a growing portion of the landscape. Under a more severe prospective warming scenario, by the end of the century more than half of the area currently capable of supporting montane conifer forest could become subject to minimal conifer regeneration in even moderate-sized (10s of ha) high-severity patches. © 2017 John Wiley & Sons Ltd.
NASA Astrophysics Data System (ADS)
Figlus, J.
2016-02-01
More than 400 barrier islands line the United States coasts providing a first line of defense against surge and wave attack during extreme storm events. While some pre- and post-storm topography and bathymetry data of barrier islands inundated during a storm exist, very little information is available to help understand the complex hydrodynamic and morphodynamic processes during storm impact. These processes are crucial to understanding sediment budgets, potential threats to infrastructure and best coastal management practices for specific locations. Follett's Island (FI) is a low-lying sediment-starved barrier island located on the Upper Texas Coast, a stretch of coastline along the Gulf of Mexico experiencing on average four hurricanes and four tropical cyclones per decade. During Hurricane Ike, water levels and wave heights at FI exceeded the 100-year and 40-year return values, respectively. This caused the island to undergo a sequence of four distinct interaction regimes, including impact, overtopping, inundation, and storm surge ebb. Each regime caused unique morphology changes to the island. The physical processes governing the real-time morphodynamic response of the beach and dune system during 96 hours of hurricane impact were modeled using XBeach (2D) and CSHORE (1D). Hydrodynamic boundary conditions were obtained from ADCIRC/SWAN model runs validated with measured buoy and wave gauge data while LiDAR surveys provided pre- and post-storm measured topography. XBeach displayed a decent model skill and was very useful in qualitatively visualizing erosion and deposition patterns during each regime. CSHORE also displayed a decent model skill and was able to accurately predict the post-storm beach slope and shoreline, but was less effective at simulating the foredune morphology. Modeling results show that the complete morphodynamic response of FI to Hurricane Ike was far more complex than suggested by only before and after storm topography surveys.
NASA Astrophysics Data System (ADS)
Gallien, T.; Barnard, P. L.; Sanders, B. F.
2011-12-01
California coastal sea levels are projected to rise 1-1.4 meters in the next century and evidence suggests mean tidal range, and consequently, mean high water (MHW) is increasing along portions of Southern California Bight. Furthermore, emerging research indicates wind stress patterns associated with the Pacific Decadal Oscillation (PDO) have suppressed sea level rise rates along the West Coast since 1980, and a reversal in this pattern would result in the resumption of regional sea level rise rates equivalent to or exceeding global mean sea level rise rates, thereby enhancing coastal flooding. Newport Beach is a highly developed, densely populated lowland along the Southern California coast currently subject to episodic flooding from coincident high tides and waves, and the frequency and intensity of flooding is expected to increase with projected future sea levels. Adaptation to elevated sea levels will require flood mapping and forecasting tools that are sensitive to the dominant factors affecting flooding including extreme high tides, waves and flood control infrastructure. Considerable effort has been focused on the development of nowcast and forecast systems including Scripps Institute of Oceanography's Coastal Data Information Program (CDIP) and the USGS Multi-hazard model, the Southern California Coastal Storm Modeling System (CoSMoS). However, fine scale local embayment dynamics and overtopping flows are needed to map unsteady flooding effects in coastal lowlands protected by dunes, levees and seawalls. Here, a recently developed two dimensional Godunov non-linear shallow water solver is coupled to water level and wave forecasts from the CoSMoS model to investigate the roles of tides, waves, sea level changes and flood control infrastructure in accurate flood mapping and forecasting. The results of this study highlight the important roles of topographic data, embayment hydrodynamics, water level uncertainties and critical flood processes required for meaningful prediction of sea level rise impacts and coastal flood forecasting.
NASA Astrophysics Data System (ADS)
Goff, J.; Swartz, J. M.; Gulick, S. P. S.
2017-12-01
Barrier islands provide critical support and protection for coastal communities and ecosystems, but are potentially vulnerable to net losses of sand during major storms. Evidence from satellite imagery, ground observations and tide stations indicates that Hurricane Harvey in 2017 caused a large outflow event of waters moving from the bays out towards the sea in the Port Aransas, Texas region. Rather than just an ebb of a storm surge, this event may have been driven by seaward-directed winds on the left side of storm. Less than a month after landfall, we conducted a swath mapping and sampling survey in Lydia Ann Channel and Aransas Pass, where we had earlier mapped in 2009 and 2012 as part of the UT marine geology and geophysical field course. These waterways are important conduits linking Corpus Christi and Aransas bays to the Gulf of Mexico. This multi-year record allows us to gauge the impact of the outflow event on these waterways in the context of "normal" coastal processes. Both satellite imagery and sonar mapping reveal that the outflow event caused significant erosion, both on land and beneath the water, along the edges of Lydia Ann Channel and Corpus Christi ship channel. It also caused seaward-directed flow and erosion through breaches in the foredunes along southern San Jose Island, from waters that overtopped Lydia Ann Channel. Much of the sand that was transported seaward settled in Lydia Ann Channel and Aransas Pass (up to 6.5 m accumulation), possibly during the waning stages of the event. However, a likely large (but unknown) quantity of barrier and estuarine sand could have been transported well out to sea, beyond the jetties, at the peak of the event. If so, it would have resulted in a net loss of sand from the barrier island system.
NASA Astrophysics Data System (ADS)
Xiao, H.; Wang, D.; Hagen, S. C.; Medeiros, S. C.; Hall, C. R.
2017-12-01
Saltwater intrusion (SWI) that has been widely recognized as a detrimental issue causing the deterioration of coastal aquifer water quality and degradation of coastal ecosystems. While it is widely recognized that SWI is exacerbated worldwide due to global sea-level rise, we show that increased SWI from tropical cyclones under climate change is also a concern. In the Cape Canaveral Barrier Island Complex (CCBIC) located in east-central Florida, the salinity level of the surficial aquifer is of great importance to maintain a bio-diverse ecosystem and to support the survival of various vegetation species. Climate change induced SWI into the surficial aquifer can lead to reduction of freshwater storage and alteration of the distribution and productivity of vegetation communities. In this study, a three-dimensional variable-density SEAWAT model is developed and calibrated to investigate the spatial and temporal variation of salinity level in the surficial aquifer of CCBIC. We link the SEAWAT model to surge model data to examine the effects of storm surge from Hurricane Jeanne. Simulation results indicate that the surficial aquifer salinity level increases significantly right after the occurrence of storm surge because of high aquifer permeability and rapid infiltration and diffusion of the overtopping saltwater, while the surficial aquifer salinity level begins to decrease after the fresh groundwater recharge from the storm's rainfall. The tropical storm precipitation generates an effective hydraulic barrier further impeding SWI and providing seaward freshwater discharge for saltwater dilution and flushing. To counteract the catastrophic effects of storm surge, this natural remediation process may take at least 15-20 years or even several decades. These simulation results contribute to ongoing research focusing on forecasting regional vegetation community responses to climate change, and are expected to provide a useful reference for climate change adaptation planning and decision-making in the CCBIC and other low-lying coastal alluvial plains and barrier island systems.
NASA Astrophysics Data System (ADS)
Keith, M. K.; Anderson, S. W.; Magirl, C. S.
2015-12-01
The March 22, 2014, catastrophic landslide near Oso, Washington, rapidly emplaced approximately 8 million m3 of slide material onto the valley floor, blocking the North Fork Stillaguamish River. Overtopping of the landslide dam and subsequent channel incision through the deposit mobilized large volumes of the glacial outwash, till, and lacustrine (silts and clays) sediment. The abundant sediment introduced to the gravel-bed channel prompted concerns of downstream aggradation and elevated hazards from seasonal flooding and channel migration. Our assessment of downstream aggradation potential and channel change was primarily based on 1) comparison of pre-slide to post-slide field-based and remote-sensing observations, 2) measurements of bedload transport, and 3) modeling of bedload transport for eight flow scenarios between 25% of the 2-year flow and the 100-year flow at several sites along the lower 65-km alluvial portion of the river. Although measurements of pre-slide grain-size distributions were highly variable from year to year, comparison of those counts to 2014 post-slide measurements show a general fining of channel and bar surface material. Between 2014 and 2015, we observed coarsening at some bars, most notably for sediment smaller than 4 mm. From aerial photograph inspection, the shape, size, and distribution of gravel and sand bars between the landslide and the mouth of the North Fork Stillaguamish River appears to have been relatively unchanged between 2013 and 2015. Post-slide bedload transport capacity rates were calculated using Parker, Wilcock and Crowe, and two forms of Recking equations. Transport capacities for the narrow and confined channel where it has incised through the landslide are much greater compared with the low gradient and wide floodplain segments downstream. Nevertheless, because of fine grain sizes within the landslide debris, most of the sediment has been transported through the downstream channel, resulting in minimal aggradation.
National assessment of hurricane-induced coastal erosion hazards: Southeast Atlantic Coast
Stockdon, Hilary F.; Doran, Kara S.; Thompson, David M.; Sopkin, Kristin L.; Plant, Nathaniel G.
2013-01-01
Beaches serve as a natural barrier between the ocean and inland communities, ecosystems, and natural resources. However, these dynamic environments move and change in response to winds, waves, and currents. During extreme storms, changes to beaches can be large, and the results are sometimes catastrophic. Lives may be lost, communities destroyed, and millions of dollars spent on rebuilding. During storms, large waves may erode beaches, and high storm surge shifts the erosive force of the waves higher on the beach. In some cases, the combined effects of waves and surge may cause overwash or flooding. Building and infrastructure on or near a dune can be undermined during wave attack and subsequent erosion. During Hurricane Ivan in 2004, a five-story condominium in Orange Beach, Alabama, collapsed after the sand dune supporting the foundation eroded. The September 1999 landfall of Hurricane Dennis caused erosion and undermining that destroyed roads, foundations, and septic systems. Waves overtopping a dune can transport sand inland, covering roads and blocking evacuation routes or emergency relief. If storm surge inundates barrier island dunes, currents flowing across the island can create a breach, or new inlet, completely severing evacuation routes. Waves and surge during the 2003 landfall of Hurricane Isabel left a 200-meter (m) wide breach that cut the only road to and from the village of Hatteras, N.C. Extreme coastal changes caused by hurricanes may increase the vulnerability of communities both during a storm and to future storms. For example, when sand dunes on a barrier island are eroded substantially, inland structures are exposed to storm surge and waves. Absent or low dunes also allow water to flow inland across the island, potentially increasing storm surge in the back bay, on the soundside of the barrier, and on the mainland. During Hurricane Isabel the protective sand dunes near the breach were completely eroded, increasing vulnerability to future storms.
McGinnis, Thomas W.; Keeley, Jon E.; Stephens, Scott L.; Roller, Gary B.
2010-01-01
Typically, after large stand-replacing fires in mid-elevation Sierra Nevada forests, dense shrub fields occupy sites formerly occupied by mature conifers, until eventually conifers overtop and shade out shrubs. Attempting to reduce fuel loads and expedite forest regeneration in these areas, the USDA Forest Service often disrupts this cycle by the logging of fire-killed trees, replanting of conifers and killing of shrubs. We measured the effects of these treatments on live and dead fuel loads and alien species and modeled potential fire behavior and fire effects on regenerating forests. Sampling occurred in untreated, logged and herbicide-treated stands throughout the Sierra Nevada in four large fire areas 4–21 years after stand-replacing fires. Logging fire-killed trees significantly increased total available dead fuel loads in the short term but did not affect shrub cover, grass and forb cover, alien species cover or alien species richness. Despite the greater available dead fuel loads, fire behavior was not modeled to be different between logged and untreated stands, due to abundant shrub fuels in both logged and untreated stands. In contrast, the herbicide treatment directed at shrubs resulted in extremely low shrub cover, significantly greater alien species richness and significantly greater alien grass and forb cover. Grass and forb cover was strongly correlated with solar radiation on the ground, which may be the primary reason that grass and forb cover was higher in herbicide treated stands with low shrub and tree cover. Repeat burning exacerbated the alien grass problem in some stands. Although modeled surface fire flame lengths and rates of spread were found to be greater in stands dominated by shrubs, compared to low shrub cover conifer plantations, surface fire would still be intense enough to kill most trees, given their small size and low crown heights in the first two decades after planting.
NASA Astrophysics Data System (ADS)
Sallenger, A. H.; Plant, N. G.; Flocks, J.; Long, J. W.; Miselis, J. L.; Sherwood, C. R.; Hansen, M.; Nayegandhi, A.; Wright, W.
2011-12-01
After the Deepwater Horizon explosion and oil spill, Louisiana received permission to build a sand berm parallel to and offshore of the ~30-km-long Chandeleur Islands to capture floating oil and keep it from reaching mainland marshes. The berm was built with dredged sand to a height of approximately 2 m above mean sea level and within 100 m of the Gulf-side of the natural barrier island. Here, we update the status of the sand berm and how its morphology has evolved since construction began in June 2010. This is part of a study of morphologic change involving time series of airborne lidar topographic and bathymetric surveys, boat acoustic bathymetric surveys, satellite imagery, and modeling of sediment transport. Waves and sea level are being monitored with models and in-situ sensors. We will examine, as of our latest surveys, whether the introduction of new sand from the berm has significantly changed peak elevations, Dhigh, along the natural islands and hence changed island vulnerability to being overtopped by storm-driven water levels, such as still-water level (η, due to tides, surge, and wave setup) and runup (R, due to swash). Vulnerabilities to overwash, where R > Dhigh, and inundation, where η > Dhigh, will be identified. We will investigate the impacts on the berm and island of extra-tropical storms through June 2011 and tropical storms through the hurricane season of summer and early fall 2011. For example, during a storm in early January 2011, significant wave heights of 4.9 m generated runup on the berm where R > Dhigh. Four breaches were cut through the berm, the largest 590 m wide. This study provides a unique opportunity to investigate the wave and current transport of a large quantity of introduced sand and determine whether and how the sand nourishes a severely eroding barrier island.
Jacobson, R.; Faust, T.
2014-01-01
Hydrologic connectivity between the channel and floodplain is thought to be a dominant factor determining floodplain processes and characteristics of floodplain forests. We explored the role of hydrologic connectivity in explaining floodplain forest community composition along streams in northern Missouri, USA. Hydrologic analyses at 20 streamgages (207–5827 km2 area) document that magnitudes of 2-year return floods increase systematically with increasing drainage area whereas the average annual number and durations of floodplain-connecting events decrease. Flow durations above the active-channel shelf vary little with increasing drainage area, indicating that the active-channel shelf is in quasi-equilibrium with prevailing conditions. The downstream decrease in connectivity is associated with downstream increase in channel incision. These relations at streamflow gaging stations are consistent with regional channel disturbance patterns: channel incision increases downstream, whereas upstream reaches have either not incised or adjusted to incision by forming new equilibrium floodplains. These results provide a framework to explain landscape-scale variations in composition of floodplain forest communities in northern Missouri. Faust (2006) had tentatively explained increases of flood-dependent tree species, and decreases of species diversity, with a downstream increase in flood magnitude and duration. Because frequency and duration of floodplain-connecting events do not increase downstream, we hypothesize instead that increases in relative abundance of flood-dependent trees at larger drainage area result from increasing size of disturbance patches. Bank-overtopping floods at larger drainage area create large, open, depositional landforms that promoted the regeneration of shade-intolerant species. Higher tree species diversity in floodplains with small drainage areas is associated with non-incised floodplains that are frequently connected to their channels and therefore subject to greater effective hydrologic variability compared with downstream floodplains. Understanding the landscape-scale geomorphic and hydrologic controls on floodplain connectivity provides a basis for more effective management and restoration of floodplain forest communities.
Huizinga, Richard J.; Rydlund, Jr., Paul H.
2001-01-01
The evaluation of scour at bridges throughout the State of Missouri has been ongoing since 1991, and most of these evaluations have used one-dimensional hydraulic analysis and application of conventional scour depth equations. Occasionally, the conditions of a site dictate that a more thorough hydraulic assessment is required. To provide the hydraulic parameters required to determine the potential scour depths at the bridge over Horse Island Chute near Chester, Illinois, a two-dimensional finite-element surface-water model (FESWMS-2DH) was used to simulate flood flows in the vicinity of the Missouri State Highway 51 crossing of the Mississippi River and Horse Island Chute. The model was calibrated using flood-flow information collected during the 1993 flood. A flood profile along the Illinois side of the Mississippi River on August 5, 1993, with a corresponding measured discharge of 944,000 cubic feet per second was used to calibrate the model. Two additional flood-flow simulations were run: the flood peak that occurred on August 6, 1993, with a maximum discharge of 1,000,000 cubic feet per second, and the discharge that caused impending overtopping of the road embankment in the vicinity of the Horse Island Chute bridge, with a discharge of 894,000 cubic feet per second (impendent discharge). Hydraulic flow parameters obtained from the simulations were applied to scour depth equations to determine general contraction and local pier and abutment scour depths at the Horse Island Chute bridge. The measured discharge of 944,000 cubic feet per second resulted in 13.3 feet of total combined contraction and local pier scour at Horse Island Chute bridge. The maximum discharge of 1,000,000 cubic feet per second resulted in 15.8 feet of total scour and the impendent discharge of 894,000 cubic feet per second resulted in 11.6 feet of total scour.
Wang, R L; Zhang, D M
2017-12-20
Objective: To discuss similarities and differences in clinical features and laboratory indexes between patients with flat descending type sudden hearing loss and those with total hearing loss. Method: The clinical data of 123 patients with full frequencies hearing loss were retrospectively analyzed. The differences in clinical features and laboratory tests(platelet, coagulation series, D-dimer, blood lipids, hemorheology) between patients with flat descending hearing loss and those with total hearing loss were analyzed by gender, age and ear side, treatment time, concomitant symptom (tinnitus, dizziness), original underlying diseases (hypertension, diabetes), etc. Result: In the clinical features,among 51 flat descending cases, the ratio of male and female was 2.401:1; among 72 total hearing loss cases, the ratio of men and women ratio was 1.058:1 ( P <0.05). Among two groups of patients,the majority received treatment within 7 days, among whom 66.7% were flat descending population, and 83.3% were total hearing loss population ( P <0.05). Flat descending population with dizziness only accounted for 35.3% while this figure was up to 70.8% when it came to total hearing loss patients ( P <0.01). Two groups showed no differences in age, ear side, tinnitus, the original underlying diseases (hypertension, diabetes). In the laboratory tests, the total hearing loss population overtopped the plat descending population in PLT and PCT ( P <0.05), while falling below the plat descending population in APTT ( P <0.01). Two groups showed no differences in other indicators of platelet and coagulation series and laboratory data of D-dimer, blood lipids, hemorheology. Conclusion: Compared with flat descending sudden hearing loss, sudden total hearing loss more frequently happened to females who also were accompanied by dizziness. The treatment rate within 7 days was high and the patients with hypercoagulable state accounted for a higher proportion. Copyright© by the Editorial Department of Journal of Clinical Otorhinolaryngology Head and Neck Surgery.
NASA Astrophysics Data System (ADS)
Gilligan, J. M.; Corey, B.; Camp, J. V.; John, N. J.; Sengupta, P.
2015-12-01
The complex interactions between land use and natural hazards pose serious challenges in education, research, and public policy. Where complex nonlinear interactions produce unintuitive results, interactive computer simulations can be useful tools for education and decision support. Emotions play important roles in cognition and learning, especially where risks are concerned. Interactive simulations have the potential to harness emotional engagement to enhance learning and understanding of risks in coupled human-natural systems. We developed a participatory agent-based simulation of cities at risk of river flooding. Participants play the role of managers of neighboring cities along a flood-prone river and make choices about building flood walls to protect their inhabitants. Simulated agents participate in dynamic real estate markets in which demand for property, and thus values and decisions to build, respond to experience with flooding over time. By reducing high-frequency low-magnitude flooding, flood walls may stimulate development, thus increasing tax revenues but also increasing vulnerability to uncommon floods that overtop the walls. Flood waves are launched stochastically and propagate downstream. Flood walls that restrict overbank flow at one city can increase the amplitude of a flood wave at neighboring cities, both up and downstream. We conducted a pilot experiment with a group of three pre-service teachers. The subjects successfully learned key concepts of risk tradeoffs and unintended consequences that can accompany flood-control measures. We also observed strong emotional responses, including hope, fear, and sense of loss. This emotional engagement with a model of coupled human-natural systems was very different from previous experiments on participatory simulations of purely natural systems for physics pedagogy. We conducted a second session in which the participants were expert engineers. We will present the results of these experiments and the prospects for using such models for middle-school, high-school, and post-secondary environmental science pedagogy, for improving public understanding of flood risks, and as decision support tools for planners.
NASA Astrophysics Data System (ADS)
Tappin, David R.; Evans, Hannah M.; Jordan, Colm J.; Richmond, Bruce; Sugawara, Daisuke; Goto, Kazuhisa
2012-12-01
A combination of time-series satellite imagery, helicopter-borne video footage and field observation is used to identify the impact of a major tsunami on a low-lying coastal zone located in eastern Japan. A comparison is made between the coast protected by armoured 'engineered' sea walls and the coast without. Changes are mapped from before and after imagery, and sedimentary processes identified from the video footage. The results are validated by field observations. The impact along a 'natural' coast, with minimal defences, is erosion focussed on the back beach. Along coasts with hard engineered protection constructed to defend against erosion, the presence of three to six metre high concrete-faced embankments results in severe erosion on their landward faces. The erosion is due to the tsunami wave accelerating through a hydraulic jump as it passes over the embankment, resulting in the formation of a ditch into which the foundations collapse. Engineered coastal defences are thus found to be small defence against highly energetic tsunami waves that overtop them. There is little erosion (or sedimentation) of the whole beach, and where active, it mainly forms V-shaped channels. These channels are probably initiated during tsunami inflow and then further developed during tsunami backflow. Tsunami backflow on such a low lying area takes place energetically as sheet flow immediately after tsunami flooding has ceased. Subsequently, when the water level landward of the coastal dune ridges falls below their elevation, flow becomes confined to rivers and breaches in the coast formed during tsunami inflow. Enigmatic, short lived, 'strand lines' are attributed to the slow fall of sea level after such a major tsunami. Immediately after the tsunami coastal reconstruction begins, sourced from the sediment recently flushed into the sea by tsunami backflow.
Modeling four occurred debris flow events in the Dolomites area (North-Eastern Italian Alps)
NASA Astrophysics Data System (ADS)
Boreggio, Mauro; Gregoretti, Carlo; Degetto, Massimo; Bernard, Martino
2016-04-01
Four occurred debris flows in the Dolomites area (North-Eastern Italian Alps) are modeled by back-analysis. The four debris flows events are those occurred at Rio Lazer (Trento) on the 4th of November 1966, at Fiames (Belluno) on the 5th of July 2006, at Rovina di Cancia (Belluno) on the 18th of July 2009 and at Rio Val Molinara (Trento) on the 15th of August 2010. In all the events, runoff entrained sediments present on natural channels and formed a solid-liquid wave that routed downstream. The first event concerns the routing of debris flow on an inhabited fan. The second event the deviation of debris flow from the usual path due to an obstruction with the excavation of a channel in the scree and the downstream spreading in a wood. The third event concerns the routing of debris flow in a channel with an ending the reservoir, its overtopping and final spreading in the inhabited area. The fourth event concerns the routing of debris flow along the main channel downstream the initiation area until spreading just upstream a village. All the four occurred debris flows are simulated by modeling runoff that entrained debris flow for determining the solid-liquid hydrograph. The routing of the solid-liquid hydrograph is simulated by a bi-phase cell model based on the kinematic approach. The comparison between simulated and measured erosion and deposition depths is satisfactory. Nearly the same parameters for computing erosion and deposition were used for all the four occurred events. The maps of erosion and deposition depths are obtained by comparing the results of post-event surveys with the pre-event DEM. The post-event surveys were conducted by using different instruments (LiDAR and GPS) or the combination photos-single points depth measurements (in this last case it is possible obtaining the deposition/erosion depths by means of stereoscopy techniques).
NASA Astrophysics Data System (ADS)
Founds, M. J.; McGwire, K.; Weltz, M.
2017-12-01
Critical research gaps in rangeland hydrology still exist on the impact of conservation practices on erosion and subsequent mobilization of dissolved solids to streams. This study develops the scientific foundation necessary to better understand how a restoration strategy using a Vallerani Plow can be optimized to minimize erosion from rainfall impact and concentrated flow. Use of the Vallerani system has been proposed for use in the Upper Colorado River Basin (UCRB), where rapidly eroding rangelands contribute high salt loads to the Colorado River at a significant economic cost. The poster presentation will document the findings from a series of physical rainfall and concentrated flow simulations taking place at an experimental site northeast of Reno, NV in early August. A Walnut Gulch Rainfall simulator is used to apply variable intensity and duration rainfall events to micro-catchment structures created by the Vallerani Plow. The erosion and deposition caused by simulated rainfall will be captured from multi-angle photography using structure from motion (SFM) to create sub-centimeter 3-D models between each rainfall event. A rill-simulator also will be used to apply large volumes of concentrated flow to Vallerani micro-catchments, testing the point at which their infiltration capacity is exceeded and micro-catchments are overtopped. This information is important to adequately space structures on a given hillslope so that chances of failure are minimized. Measurements of saturated hydraulic conductivity and sorptivity from a Guelph Permeameter will be compared to the experimental results in order to develop an efficient method for surveying new terrain for treatment with the Vallerani plow. The effect of micro-catchments on surface flow and erosion will eventually be incorporated into the process-based Rangeland Hydrology and Erosion Model (RHEM) to create a tool that provides decision makers with quantitative estimates of potential reductions in erosion when using the Vallerani System to restore highly erosive rangelands within the UCRB.
Streambed scour evaluations and conditions at selected bridge sites in Alaska, 2013–15
Beebee, Robin A.; Dworsky, Karenth L.; Knopp, Schyler J.
2017-12-27
Streambed scour potential was evaluated at 52 river- and stream-spanning bridges in Alaska that lack a quantitative scour analysis or have unknown foundation details. All sites were evaluated for stream stability and long-term scour potential. Contraction scour and abutment scour were calculated for 52 bridges, and pier scour was calculated for 11 bridges that had piers. Vertical contraction (pressure flow) scour was calculated for sites where the modeled water surface was higher than the superstructure of the bridge. In most cases, hydraulic models of the 1- and 0.2-percent annual exceedance probability floods (also known as the 100- and 500-year floods, respectively) were used to derive hydraulic variables for the scour calculations. Alternate flood values were used in scour calculations for sites where smaller floods overtopped a bridge or where standard flood-frequency estimation techniques did not apply. Scour also was calculated for large recorded floods at 13 sites.Channel instability at 11 sites was related to human activities (in-channel mining, dredging, and channel relocation). Eight of the dredged sites are located on active unstable alluvial fans and were graded to protect infrastructure. The trend toward aggradation during major floods at these sites reduces confidence in scour estimates.Vertical contraction and pressure flow occurred during the 0.2-percent or smaller annual exceedance probability floods at eight sites. Contraction scour exceeded 5 feet (ft) at four sites, and total scour at piers (pier scour plus contraction scour) exceeded 5 ft at four sites. Debris accumulation increased calculated pier scour at six sites by an average of 2.4 ft. Total scour at abutments exceeded 5 ft at 10 sites. Scour estimates seemed excessive at two piers where equations did not account for channel armoring, and at four abutments where failure of the embankment and attendant channel widening would reduce scour.
Olson, Scott A.
1996-01-01
D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 4.2 to 9.4 ft. The worst-case contraction scour occurred at the incipient-overtopping discharge which was less than the 100-year discharge. Abutment scour ranged from 4.3 to 17.5 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1993, p. 48). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Modeling the GLOF Hazard Process Chain at Imja Lake in the Nepal Himalaya
NASA Astrophysics Data System (ADS)
Lala, J.; McKinney, D. C.; Rounce, D.
2017-12-01
The Hindu Kush-Himalaya region contains more glacial ice than any other non-polar region on earth. Many glacial lakes in Nepal are held in place by natural moraine dams, which are inherently unstable. Avalanches or landslides entering glacial lakes can cause tsunami-like waves that can overtop the moraines and trigger glacial lake outburst floods (GLOF). Mass loss at the Imja glacier is the highest in the Mount Everest region, and contributes to the expansion of Imja Tsho, a lake with several villages downstream. A GLOF from the lake might destroy both property and human life, making an understanding of flood triggering processes beneficial for both the downstream villages and other GLOF-prone areas globally. The process chain for an avalanche-induced GLOF was modeled numerically. The volume and velocity of debris from avalanches entering various future lake extents were calculated using RAMMS. Resulting waves and downstream flooding were simulated using BASEMENT to evaluate erosion at the terminal moraine. Wave characteristics in BASEMENT were validated with empirical equations to ensure the proper transfer of momentum from the avalanche to the lake. Moraine erosion was determined for two geomorphologic scenarios: a site-specific scenario using field samples, and a worst-case scenario based on past literature. Both cases resulted in no flooding outside the river channel at downstream villages. Worst-case scenario geomorphology resulted in increased channelization of the lake outlet and some moraine erosion but no catastrophic collapse. Site-specific data yielded similar results but with even less erosion and downstream discharge. While the models confirmed that Imja Tsho is unlikely to produce a catastrophic GLOF in the near future, they also highlight the importance of continued monitoring of the lake. Furthermore, the ease and flexibility of these methods allows for their adoption by a wide range of stakeholders for modeling other high-risk lakes.
Optimal Hedging Rule for Reservoir Refill Operation
NASA Astrophysics Data System (ADS)
Wan, W.; Zhao, J.; Lund, J. R.; Zhao, T.; Lei, X.; Wang, H.
2015-12-01
This paper develops an optimal reservoir Refill Hedging Rule (RHR) for combined water supply and flood operation using mathematical analysis. A two-stage model is developed to formulate the trade-off between operations for conservation benefit and flood damage in the reservoir refill season. Based on the probability distribution of the maximum refill water availability at the end of the second stage, three zones are characterized according to the relationship among storage capacity, expected storage buffer (ESB), and maximum safety excess discharge (MSED). The Karush-Kuhn-Tucker conditions of the model show that the optimality of the refill operation involves making the expected marginal loss of conservation benefit from unfilling (i.e., ending storage of refill period less than storage capacity) as nearly equal to the expected marginal flood damage from levee overtopping downstream as possible while maintaining all constraints. This principle follows and combines the hedging rules for water supply and flood management. A RHR curve is drawn analogously to water supply hedging and flood hedging rules, showing the trade-off between the two objectives. The release decision result has a linear relationship with the current water availability, implying the linearity of RHR for a wide range of water conservation functions (linear, concave, or convex). A demonstration case shows the impacts of factors. Larger downstream flood conveyance capacity and empty reservoir capacity allow a smaller current release and more water can be conserved. Economic indicators of conservation benefit and flood damage compete with each other on release, the greater economic importance of flood damage is, the more water should be released in the current stage, and vice versa. Below a critical value, improving forecasts yields less water release, but an opposing effect occurs beyond this critical value. Finally, the Danjiangkou Reservoir case study shows that the RHR together with a rolling horizon decision approach can lead to a gradual dynamic refilling, indicating its potential for practical use.
Wild, Emily C.
1998-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure LINCTH00060046 on Town Highway 6 crossing the New Haven River, Lincoln, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (FHWA, 1993). Results of a Level I scour investigation also are included in appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in appendix D. The site is in the Green Mountain section of the New England physiographic province in west-central Vermont. The 45.9-mi2 drainage area is in a predominantly suburban and forested basin. In the vicinity of the study site, the surface cover is forest upstream of the bridge. The downstream right overbank near the bridge is suburban with buildings, homes, lawns, and pavement (less than fifty percent). The downstream left overbank is brushland while the immediate banks have dense woody vegetation. In the study area, the New Haven River has an incised, sinuous channel with a slope of approximately 0.01 ft/ft, an average channel top width of 95 ft and an average bank height of 7 ft. The channel bed material ranges from sand to bedrock with a median grain size (D50) of 120.7 mm (0.396 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 13, 1996, indicated that the reach was stable. The Town Highway 34 crossing of the New Haven River is a 85-ft-long, two-lane bridge consisting of an 80-foot steel arch truss (Vermont Agency of Transportation, written communication, December 14, 1995). The opening length of the structure parallel to the bridge face is 69 feet. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 25 degrees to the opening while the opening-skew-to-roadway is 5 degrees. A scour hole 2.0 ft deeper than the mean thalweg depth was observed in the downstream channel during the Level I assessment. Protection measures at the site include type-1 stone fill (less than 12 inches diameter) at the upstream left wingwall, type-2 stone fill (less than 36 inches diameter) at the downstream end of the downstream left wingwall, and type-3 stone fill (less than 48 inches diameter) at the upstream right wingwall and the downstream end of the downstream right wingwall. Additional details describing conditions at the site are included in the Level II Summary and appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and Davis, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 1.7 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge. Left abutment scour ranged from 12.9 to 17.8 ft. Right abutment scour ranged from 5.9 to 11.9 ft. The worst-case abutment scour occurred at the incipient roadway-overtopping discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and Davis, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Wild, Emily C.; Hammond, Robert E.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure ROYATH00920029 on Town Highway 92 crossing the First Branch White River, Royalton, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in central Vermont. The 101-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture upstream and downstream of the bridge. In the study area, the First Branch White River has an incised, sinuous channel with a slope of approximately 0.001 ft/ft, an average channel top width of 81 ft and an average bank height of 9 ft. The channel bed material ranges from sand to bedrock with a median grain size (D50) of 1.18 mm (0.00347 ft). The geomorphic assessment at the time of the Level I site visit on July 23, 1996 and Level II site visit on June 2, 1995, indicated that the reach was stable. The Town Highway 92 crossing of the First Branch White River is a 59-ft-long, one-lane bridge consisting of a 57-foot steel-stringer span (Vermont Agency of Transportation, written communication, March 23, 1995). The opening length of the structure parallel to the bridge face is 52.2 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 20 degrees to the opening while the opening-skew-to-roadway is zero degrees. A scour hole 4.0 ft deeper than the mean thalweg depth was observed in the upstream channel during the Level I assessment. The only scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) along the upstream left and right wingwalls, the left abutment and downstream left wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge was determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 4.1 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge, which was less than the 100-year discharge. Left abutment scour ranged from 12.9 to 15.4 ft, where the worst-case abutment scour occurred at the 500-year discharge. Right abutment scour ranged from 14.5 to 15.0 ft, where the worst-case abutment scour occurred at the 100-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Wild, Emily C.; Weber, Matthew A.
1998-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure PLYMTH00540047 on Town Highway 54 crossing Pinney Hollow Brook, Plymouth, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (FHWA, 1993). Results of a Level I scour investigation also are included in appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gathered from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in appendix D. The site is in the Green Mountain section of the New England physiographic province in south-central Vermont. The 7.9-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture upstream and downstream of the bridge while the immediate banks have dense woody vegetation. In the study area, Pinney Hollow Brook has an incised, straight channel with a slope of approximately 0.01 ft/ft, an average channel top width of 57 ft and an average bank height of 7 ft. The channel bed material ranges from sand to cobbles with a median grain size (D50) of 45.7 mm (0.150 ft). The geomorphic assessment at the time of the Level I and Level II site visit on March 30, 1995 and Level II site visit on October 2, 1995, indicated that the reach was stable. The Town Highway 54 crossing of Pinney Hollow Brook is a 30-ft-long, two-lane bridge consisting of a 27-foot steel-stringer span (Vermont Agency of Transportation, written communication, March 22, 1995). The opening length of the structure parallel to the bridge face is 25.7 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is not skewed to the opening and the opening-skew-to-roadway is zero degrees. Scour protection measures at the site included type-1 stone fill (less than 12 inches diameter) along the upstream left wingwall, the upstream right wingwall and the downstream end of the downstream left wingwall. Additional details describing conditions at the site are included in the Level II Summary and appendices D and E.Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and Davis, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge was determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 2.0 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge, which was less than the 100-year discharge. Left abutment scour ranged from 3.4 to 6.7 ft. The worst-case left abutment scour occurred at the 500-year discharge. Right abutment scour ranged from 8.9 to 9.6 ft. The worst-case right abutment scour occurred at the 100-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and Davis, 1995, p. 46). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Wild, Emily C.; Hammond, Robert E.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure CHESTH00030010 on Town Highway 3 (VT 35) crossing the South Branch Williams River, Chester, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D.The site is in the New England Upland section of the New England physiographic province in southeastern Vermont. The 9.44-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest.In the study area, the South Branch Williams River has an incised, sinuous channel with a slope of approximately 0.03 ft/ft, an average channel top width of 67 ft and an average bank height of 5 ft. The channel bed material ranges from gravel to boulder with a median grain size (D50) of 69.0 mm (0.226 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 26-27, 1996, indicated that the reach was stable.The Town Highway 3 (VT 35) crossing of the South Branch Williams River is a 69-foot-long, two-lane bridge consisting of one 67-foot steel-stringer span with a concrete deck (Vermont Agency of Transportation, written communication, August 23, 1994). The opening length of the structure parallel to the bridge face is 64.5 ft. The bridge is supported by vertical, concrete abutments with spill-through embankments. The channel is skewed approximately 50 degrees to the opening while the opening-skew-to-roadway is 30 degrees.The scour protection (spill-through abutments) measured at the site was type-3 stone fill (less than 48 inches diameter) extending the entire base length and around the ends of the left and right abutments. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E.Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows.Contraction scour for modelled flows ranged from 0.8 to 3.8 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge. Left abutment scour ranged from 13.3 to 14.9 ft. The worst-case scour at the left abutment occurred at the 500-year discharge. Right abutment scour ranged from 4.1 to 6.0 ft. The worst-case scour at the right abutment occurred at the incipient roadway-overtopping discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution.It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Ivanoff, Michael A.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure CORITH00500034 on Town Highway 50 crossing the South Branch Waits River, Corinth, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in central Vermont. The 35.9-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture upstream and downstream of the bridge while the immediate banks have dense woody vegetation. In the study area, the South Branch Waits River has an incised, meandering channel with a slope of approximately 0.005 ft/ft, an average channel top width of 63 ft and an average bank height of 6 ft. The channel bed material ranges from sand to cobble with a median grain size (D50) of 23.7 mm (0.078 ft). The geomorphic assessment at the time of the Level I and Level II site visit on September 5, 1995, indicated that the reach was stable. The Town Highway 50 crossing of the South Branch Waits River is a 56-ft-long, one-lane bridge consisting of one 54-foot steel thru-truss span (Vermont Agency of Transportation, written communication, March 24, 1995). The opening length of the structure parallel to the bridge face is 51.5 ft.The bridge is supported by vertical, concrete abutments with no wingwalls. Stone fill and bank material in front of the abutments create spill-through embankments. The channel is skewed approximately 30 degrees to the opening while the opening-skew-to-roadway is 15 degrees. A scour hole 2.5 ft deeper than the mean thalweg depth was observed along the left bank through the bridge during the Level I assessment. The only scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) along the left and right banks extending from upstream to downstream through the bridge. The stone fill under the bridge creates spill-through embankments. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge was determined and analyzed as other potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 3.0 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge, which was less than the 100-year discharge. Abutment scour ranged from 2.4 to 6.3 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich and HIRE equations (abutment scour) give “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Burns, Ronda L.; Ivanoff, Michael A.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure HUNTTH00210034 on Town Highway 21 crossing Brush Brook, Huntington, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in central Vermont. The 6.23-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest. In the study area, Brush Brook has an incised, straight channel with a slope of approximately 0.03 ft/ft, an average channel top width of 43 ft and an average bank height of 4 ft. The channel bed material ranges from gravel to boulder with a median grain size (D50) of 90.0 mm (0.295 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 26, 1996, indicated that the reach was stable. The Town Highway 21 crossing of Brush Brook is a 28-ft-long, one-lane bridge consisting of one 26-foot steel-beam span with a timber deck (Vermont Agency of Transportation, written communication November 30, 1995). The opening length of the structure parallel to the bridge face is 25.4 ft. The bridge is supported by vertical, concrete abutments with a wingwall on the upstream right. The channel is skewed approximately 5 degrees to the opening and the computed opening-skew-to-roadway is 5 degrees. A tributary enters Brush Brook on the right bank immediately downstream of the bridge. At the confluence, the left bank of Brush Brook is eroded and there is a small void under the downstream end of the left abutment footing which is completely exposed. The right abutment footing is also exposed. The scour countermeasures at the site include type-2 stone fill (less than 36 inches diameter) along the upstream banks and in front of the right abutment and type-3 stone fill (less than 48 inches diameter) along the entire base length of the upstream right wingwall and along the downstream right bank. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.7 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge, which was less than the 100-year discharge. Abutment scour ranged from 6.9 to 10.9 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Burns, Ronda L.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure CONCTH00580033 on Town Highway 58 crossing Miles Stream, Concord, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in northeastern Vermont. The 17.9-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture upstream of the bridge while the immediate banks have dense woody vegetation. Downstream of the bridge, the right bank is forested and the left bank has shrubs and brush. In the study area, Miles Stream has an incised, sinuous channel with a slope of approximately 0.01 ft/ft, an average channel top width of 91 ft and an average bank height of 7 ft. The channel bed material ranges from gravel to boulder with a median grain size (D50) of 61.6 mm (0.188 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 15, 1995, indicated that the reach was stable. The Town Highway 58 crossing of Miles Stream is a 44-ft-long, two-lane bridge consisting of one 39-foot steel-beam span (Vermont Agency of Transportation, written communication, March 24, 1995). The opening length of the structure parallel to the bridge face is 37.4 ft. The bridge is supported by vertical, concrete abutments with stone fill in front creating spillthrough embankments. The channel is skewed approximately 20 degrees to the opening while the opening-skew-to-roadway is zero degrees. The only scour countermeasure at the site was type-3 stone fill (less than 48 inches diameter) along the left and right banks upstream, in front of the abutments forming spill through embankments, and extending along the banks downstream. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 1.8 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 4.0 to 9.7 ft. The worst-case abutment scour occurred at the 500-year discharge for the right abutment and at the incipient roadway-overtopping discharge for the left abutment. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Striker, Lora K.; Medalie, Laura
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure MORETH00010021 on Town Highway 1 crossing Cox Brook, Moretown, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in north-central Vermont. The 2.85-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is predominantly forested. In the study area, Cox Brook has an incised, sinuous channel with a slope of approximately 0.02 ft/ft, an average channel top width of 23 ft and an average bank height of 4 ft. The channel bed material ranges from gravel to cobble with a median grain size (D50) of 47.5 mm (0.156 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 18, 1996, indicated that the reach was stable. The Town Highway 1 crossing of Cox Brook is a 29-ft-long, two-lane bridge consisting of one 27-foot steel-beam span (Vermont Agency of Transportation, written communication, October 13, 1995). The opening length of the structure parallel to the bridge face is 24.8 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 60 degrees to the opening while the measured opening-skew-to-roadway is 40 degrees. A scour hole 1.0 ft deeper than the mean thalweg depth was observed along the left abutment downstream during the Level I assessment. The only scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) along the left bank upstream. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100-year and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.2 to 0.5 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge, which was less than the 100-year discharge. Abutment scour ranged from 2.8 to 4.0 ft. The worst-case abutment scour occurred at the left abutment at the 100-year discharge and at the right abutment at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Flynn, Robert H.; Degnan, James R.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure HUNTTH00220031 on Town Highway 22 crossing Brush Brook, Huntington, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, obtained from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in west-central Vermont. The 5.01-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover consists of trees and brush. In the study area, Brush Brook has an incised, straight channel with a slope of approximately 0.06 ft/ft, an average channel top width of 44 ft and an average bank height of 4 ft. The channel bed material ranges from boulder to gravel with a median grain size (D50) of 107.0 mm (0.352 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 25, 1996, indicated that the reach was stable. The Town Highway 22 crossing of Brush Brook is a 34-ft-long, one-lane bridge consisting of one 30-foot steel I-beam span (Vermont Agency of Transportation, written communication, November 30, 1995). The opening length of the structure parallel to the bridge face is 31.2 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 15 degrees to the opening while the computed opening-skew-to-roadway is 10 degrees. The VTAOT computed opening-skewto-roadway is 2 degrees. A scour hole 1.0 ft deeper than the mean thalweg depth was observed at the downstream end of the left abutment during the Level I assessment. The only scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) along the upstream right bank. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows was computed to be zero ft. Abutment scour ranged from 7.0 to 10.5 ft. The worst-case abutment scour occurred at the 500-year discharge for the left abutment and at the incipient-overtopping discharge for the right abutment. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Wild, Emily C.; Flynn, Robert H.
1998-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure FFIETH00470046 on Town Highway 47 crossing Black Creek, Fairfield, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (FHWA, 1993). Results of a Level I scour investigation also are included in appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gathered from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in appendix D. The site is in the Green Mountain section of the New England physiographic province in northwestern Vermont. The 37.8 mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture upstream and downstream of the bridge while the immediate banks have dense woody vegetation. In the study area, Black Creek has a meandering channel with a slope of approximately 0.0005 ft/ft, an average channel top width of 51 ft and an average bank height of 6 ft. The channel bed material ranges from sand to bedrock with a median grain size (D50) of 0.189 mm (0.00062 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 12, 1995, indicated that the reach was stable. The Town Highway 47 crossing of Black Creek is a 35-ft-long, one-lane bridge consisting of one 31-ft steel-stringer span (Vermont Agency of Transportation, written communication, March 8, 1995). The opening length of the structure parallel to the bridge face is 28.0 ft. The bridge is supported by vertical, laid-up stone abutments with wingwalls. The channel is skewed approximately zero degrees to the opening and the opening-skew-toroadway is zero degrees. A scour hole 6.0 ft deeper than the mean thalweg depth was observed just downstream of the bridge during the Level I assessment. Scour protection measures at the site included type-1 stone fill (less than 12 inches diameter) along the left abutment. Type-2 stone fill (less than 36 inches diameter) extended along the upstream left and right banks, the upstream left and right wingwalls, the downstream left wingwall, and the downstream left bank. Additional details describing conditions at the site are included in the Level II Summary and appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and Davis, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge was determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 1.4 to 8.2 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge, which was less than the 100-year discharge. Abutment scour ranged from 5.8 to 15.6 ft. At the left abutment, the worst-case abutment scour occurred at the 100-year discharge, and at the right abutment the worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results.” Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and Davis, 1995, p. 46). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
NASA Astrophysics Data System (ADS)
Schubert, J. E.; Gallien, T.; Shakeri Majd, M.; Sanders, B. F.
2012-12-01
Globally, over 20 million people currently reside below high tide levels and 200 million are below storm tide levels. Future climate change along with the pressures of urbanization will exacerbate flooding in low lying coastal communities. In Southern California, coastal flooding is triggered by a combination of high tides, storm surge, and waves and recent research suggests that a current 100 year flood event may be experienced on a yearly basis by 2050 due to sea level rise adding a positive offset to return levels. Currently, Southern California coastal communities mitigate the threat of beach overwash, and consequent backshore flooding, with a combination of planning and operational activities such as protective beach berm construction. Theses berms consist of temporary alongshore sand dunes constructed days or hours before an extreme tide or wave event. Hydraulic modeling in urbanized embayments has shown that coastal flooding predictions are extremely sensitive to the presence of coastal protective infrastructure, requiring parameterization of the hard infrastructure elevations at centimetric accuracy. Beach berms are an example of temporary dynamic structures which undergo severe erosion during extreme events and are typically not included in flood risk assessment. Currently, little is known about the erosion process and performance of these structures, which adds uncertainty to flood hazard delineation and flood forecasts. To develop a deeper understanding of beach berm erosion dynamics, three trapezoidal shaped berms, approximately 35 m long and 1.5 m high, were constructed and failure during rising tide conditions was observed using terrestrial laser scanning. Concurrently, real-time kinematic GPS, high-definition time lapse photography, a local tide gauge and wave climate data were collected. The result is a rich and unique observational dataset capturing berm erosion dynamics. This poster highlights the data collected and presents methods for processing and leveraging multi-sensor field observation data. The data obtained from this study will be used to support the development and validation of a numerical beach berm overtopping and overwash model that will allow for improved predictions of coastal flood damage during winter storms and large swells.
Filling of Spirit Lake, Washington, May 18, 1980 to July 31, 1982
Meyer, William; Carpenter, Philip J.
1983-01-01
The rockslide/debris avalanche from the north face of Mount St. Helens that precipitated the volcano 's eruption on May 18, 1980 , blocked outflow from Spirit Lake, Washington. There has been no surface outflow since that time. From May 21, 1980, when the first measurement of lake level was made, to August 1, 1982, Spirit Lake has increased its volume from 122,800 acre-ft to 264 ,000 acre-ft, an increase of 115%. Lake level has risen approximately 54 ft during this period. Hydrologic and geologic properties of the debris dam are unknown, but the materials obviously are easily erodible. Steep walled channels up to 60 ft deep have been eroded into the dam and are extending headward toward the lowest points on the crest. In addition, it appears that the lower areas on the crest of the dam are underlain by ash cloud deposits of low density. Indications are that the debris dam could fail by headward erosion, by overtopping with rapid downcutting, or by ' piping ' and rapid erosion. Each type of failure can produce rapid release of stored lake water with very high discharge rates. On the basis of observed filling rates of the lake over the last two yr and precipitation records at four long-term, low altitude National Weather Service stations, it is expected that normal precipitation will fill the lake to the dam crest in December 1985. This estimate is also based on the assumption that loss of water from the lake by seepage continues at the present rate until December 1985. With normal precipitation during the coming yr (August 1982 through July 1983 the lake will fill to a level 50 ft below the lowest existing point on the crest of the debris dam, which is at 3,532 ft altitude. If precipitation exceeds normal by 1.5 times during this coming year, the lake level will be 40 ft below the 3 ,532-ft crest of the debris dam by the end of July 1983. This same lake level can be reached by the end of March 1983 if precipitation from October through March is twice the winter mean. (Author 's abstract)
Flood of October 1986 at Seward, Alaska
Jones, S.H.; Zenone, Chester
1988-01-01
Broad areas along the lower Resurrection River and Salmon Creek as well as the surfaces of several adjacent alluvial fans in the Seward area were flooded as a result of the intensive rainstorm of October 9-11, 1986. Severe erosion took place through the steep gradient, mountain canyons and near the apex of the fans, while rock and debris were deposited on the distal parts of the fans. In Godwin, Lost, Box Canyon, Japanese, and Spruce Creek basins, and perhaps others, landslides or debris avalanches dammed the streams temporarily. Subsequent failure or overtopping of these dams led to ' surge-release ' flooding; peak discharge of such a flood at Spruce Creek was 13,600 cu ft/sec, four times as great as any previously known maximum discharge from the basin and 2.5 times as great as the runoff rate from the debris dam. Flood discharges were determined indirectly--using the slope-area method--at ten high-gradient reaches on nine streams. Computed peak discharges for several small basins were the largest since records began in 1963. The largest rainfall-runoff rate unaffected by surge-release was 1 ,020 cu ft per sec per sq mi at Rudolph Creek, which has a drainage area of 1.00 sq mi. The 15.05 inches of rain that fell in one 24-hour period during the storm was assigned a recurrence interval of 100 years or greater. The length of the streamflow record available for most Seward area streams-25 years or less-is inadequate to reliably define flood frequency relations for recurrence intervals as great as 100 years. However, the slope-area determined discharge of Spruce Creek above the debris avalanche indicates a recurrence interval of a 100 years or greater. In addition, conventional flood-frequency analysis techniques are not applicable to peak discharges that are affected by surge-release phenomena. Large, damaging floods have repeatedly caused major damage in the Seward area, and the potential for catastrophic, debris-laden floods is an ever-present threat to areas bordering the many steep mountain streams. (Author 's abstract)
Denlinger, Roger P.
2012-01-01
The eruption of Mount St. Helens in 1980 produced a debris avalanche that flowed down the upper reaches of the North Fork Toutle River in southwestern Washington, clogging this drainage with sediment. In response to continuous anomalously high sediment flux into the Toutle and Cowlitz Rivers resulting from this avalanche and associated debris flows, the U.S. Army Corps of Engineers completed a Sediment Retention Structure (SRS) on the North Fork Toutle River in May 1989. For one decade, the SRS effectively blocked most of the sediment transport down the Toutle River. In 1999, the sediment level behind the SRS reached the elevation of the spillway base. Since then, a higher percentage of sediment has been passing the SRS and increasing the flood risk in the Cowlitz River. Currently (2012), the dam is filling with sediment at a rate that cannot be sustained for its original design life, and the U.S. Army Corps of Engineers is concerned with the current ability of the SRS to manage floods. This report presents an assessment of the ability of the dam to pass large flows from three types of scenarios (it is assumed that no damage to the spillway will occur). These scenarios are (1) a failure of the debris-avalanche blockage forming Castle Lake that produces a dambreak flood, (2) a debris flow from failure of that blockage, or (3) a debris flow originating in the crater of Mount St. Helens. In each case, the flows are routed down the Toutle River and through the SRS using numerical models on a gridded domain produced from a digital elevation model constructed with existing topography and dam infrastructure. The results of these simulations show that a structurally sound spillway is capable of passing large floods without risk of overtopping the crest of the dam. In addition, large debris flows originating from Castle Lake or the crater of Mount St. Helens never reach the SRS. Instead, debris flows fill the braided channels upstream of the dam and reduce its storage capacity.
NASA Astrophysics Data System (ADS)
Anderson, S. W.; Magirl, C. S.; Keith, M. K.
2015-12-01
On March 22, 2014, the Oso landslide, located in northwestern Washington State, catastrophically mobilized about 8 million m3 of mixed glacial sediment, creating a valley-wide blockage that impounded the North Fork Stillaguamish River to a height of 8 m. The river overtopped the landslide blockage within several days and incised a new channel through predominately fine-grained, cohesive glaciolacustrine sediment in the center of the deposit. Our research focuses on the evolution of this new channel. Using a consumer-grade digital camera mounted on a fixed wing-aircraft, we used structure-from-motion (SfM) photogrammetry to produce 25 cm digital elevation models (DEMs) of the channel at one-month intervals between November 2014 and July 2015. A large RTK GPS validation dataset and inter-survey comparisons documents sub-decimeter vertical and horizontal accuracies. In combination with aerial lidar surveys acquired in March and April 2014, this dataset provides a uniquely resolved look at the erosion of a landslide dam. The newly-formed channel incised rapidly, lowering to within a meter of its pre-slide elevation by May 2014 despite modest flows. During high flows of the 2014-2015 winter flood season, erosion was dominated by channel widening of tens of meters with an overall stable planform. Incision fully returned the channel to pre-slide elevations by December 2014. A total of 510,000 +/- 50,000 m3 of material was eroded between March 2014 and July 2015, split evenly between the initial period of incision and the later period of widening. Sediment yield and channel morphology showed asymptotic trends towards stability. Measurements of deposit bulk density and grain size allowed conversion of volumetric sediment yields to mass yields by size classes. Over the 16 months after the slide, the river eroded about 0.82 +/- 0.1 Mt of sediment, of which 0.78 Mt was finer than 2mm. This yield agrees within 15% of an independent estimate based on concurrent sediment gaging in the reach, and represents about 400% of the background sediment yield over that same period.
NASA Astrophysics Data System (ADS)
Curran, Janet H.; Loso, Michael G.; Williams, Haley B.
2017-09-01
Flow spilling out of an active braid plain often signals the onset of channel migration or avulsion to previously occupied areas. In a recently deglaciated environment, distinguishing between shifts in active braid plain location, considered reversible by fluvial processes at short timescales, and more permanent glacier-conditioned changes in stream position can be critical to understanding flood hazards. Between 2009 and 2014, increased spilling from the Exit Creek braid plain in Kenai Fjords National Park, Alaska, repeatedly overtopped the only access road to the popular Exit Glacier visitor facilities and trails. To understand the likely cause of road flooding, we consider recent processes and the interplay between glacier and fluvial system dynamics since the maximum advance of the Little Ice Age, around 1815. Patterns of temperature and precipitation, the variables that drive high streamflow via snowmelt, glacier meltwater runoff, and rainfall, could not fully explain the timing of road floods. Comparison of high-resolution topographic data between 2008 and 2012 showed a strong pattern of braid plain aggradation along 3 km of glacier foreland, not unexpected at the base of mountainous glaciers and likely an impetus for channel migration. Historically, a dynamic zone follows the retreating glacier in which channel positions shift rapidly in response to changes in the glacier margin and fresh morainal deposits. This period of paraglacial adjustment lasts one to several decades at Exit Glacier. Subsequently, as moraine breaches consolidate and lock the channel into position, and as the stream regains the lower-elevation valley center, upper-elevation surfaces are abandoned as terraces inaccessible by fluvial processes for timescales of decades to centuries. Where not constrained by these terraces and moraines, the channel is free to migrate, which in this aggradational setting generates an alluvial fan at the breach of the final prominent moraine. The position of this fan is glacially conditioned but the process of migration of the braided channels across it is not. This broad perspective on channel controls identifies incipient avulsion into the roadside forest as part of a long-term fan-building process independent from changes in streamflow or sediment load.
Formative flow in bedrock canyons
NASA Astrophysics Data System (ADS)
Venditti, J. G.; Kwoll, E.; Rennie, C. D.; Church, M. A.
2017-12-01
In alluvial channels, it is widely accepted that river channel configuration is set by a formative flow that represents a balance between the magnitude and frequency of flood flows. The formative flow is often considered to be one that is just capable of filling a river channel to the top of its banks. Flows much above this formative flow are thought to cause substantial sediment transport and rearrange the channel morphology to accommodate the larger flow. This idea has recently been extended to semi-alluvial channels where it has been shown that even with bedrock exposed, the flows rarely exceed that required to entrain the local sediment cover. What constitutes a formative flow in a bedrock canyon is not clear. By definition, canyons have rock walls and are typically incised vertically, removing the possibility of the walls being overtopped, as can occur in an alluvial channel at high flows. Canyons are laterally constrained, have deep scour pools and often have width to maximum depth ratios approaching 1, an order of magnitude lower than alluvial channels. In many canyons, there are a sequence of irregularly spaced scour pools. The bed may have intermittent or seasonal sediment cover, but during flood flows the sediment bed is entrained leaving a bare bedrock channel. It has been suggested that canyons cut into weak, well-jointed rock may adjust their morphology to the threshold for block plucking because the rock bed is labile during exceptionally large magnitude flows. However, this hypothesis does not apply to canyons cut into massive crystalline rock where abrasion is the dominant erosion process. Here, we argue that bedrock canyon morphology is adjusted to a characteristic flow structure developed in bedrock canyons. We show that the deeply scoured canyon floor is adjusted to a velocity inversion that is present at low flows, but gets stronger at high flows. The effect is to increase boundary shear stresses along the scour pool that forms in constricted bedrock canyons, thereby increasing abrasion rates and the potential for block plucking from massive crystalline rock beds.
Olson, Scott A.; Medalie, Laura
1997-01-01
2 stone fill also protects the channel banks upstream and downstream of the bridge for a minimum distance of 17 feet from the respective bridge faces. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour computed for all modelled flows ranged from 0.9 to 5.0 ft. The worst-case contraction scour occurred at the 500-year discharge. Computed left abutment scour ranged from 15.3 to 16.5 ft. with the worst-case scour occurring at the incipient roadway-overtopping discharge. Computed right abutment scour ranged from 6.0 to 8.7 ft. with the worst-case scour occurring at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
NASA Astrophysics Data System (ADS)
Akyurek, Z.; Bozoglu, B.; Girayhan, T.
2015-12-01
Flooding has the potential to cause significant impacts to economic activities as well as to disrupt or displace populations. Changing climate regimes such as extreme precipitation events increase flood vulnerability and put additional stresses on infrastructure. In this study the flood modelling in an urbanized area, namely Samsun-Terme in Blacksea region of Turkey is done. MIKE21 with flexible grid is used in 2- dimensional shallow water flow modelling. 1/1000 scaled maps with the buildings for the urbanized area and 1/5000 scaled maps for the rural parts are used to obtain DTM needed in the flood modelling. The bathymetry of the river is obtained from additional surveys. The main river passing through the urbanized area has a capacity of Q5 according to the design discharge obtained by simple ungauged discharge estimation depending on catchment area only. The effects of the available structures like bridges across the river on the flooding are presented. The upstream structural measures are studied on scenario basis. Four sub-catchments of Terme River are considered as contributing the downstream flooding. The existing circumstance of the Terme River states that the meanders of the river have a major effect on the flood situation and lead to approximately 35% reduction in the peak discharge between upstream and downstream of the river. It is observed that if the flow from the upstream catchments can be retarded through a detention pond constructed in at least two of the upstream catchments, estimated Q100 flood can be conveyed by the river without overtopping from the river channel. The operation of the upstream detention ponds and the scenarios to convey Q500 without causing flooding are also presented. Structural management measures to address changes in flood characteristics in water management planning are discussed. Flood risk is obtained by using the flood hazard maps and water depth-damage functions plotted for a variety of building types and occupancies. The estimated mean annual hazard for the area is calculated as $340 000 and it is estimated that the upstream structural management measures can decrease the direct economic risk 11% for the 500 return period flood.
A Model of Beaver Meadow Complex Evolution in the Silvies River Basin, Oregon.
NASA Astrophysics Data System (ADS)
Nash, C.; Grant, G.; Campbell, S. D.
2014-12-01
There is increasing evidence to suggest that the pervasive incision seen in the American West is due, in part, to the removal of beaver (Castor canadensis) in the first half of the 19th century. New restoration strategies for these systems focus on the reintroduction of beaver and construction of beaver dam analogs. Such dams locally raise streams beds and water tables, reconnect incised channels to their former floodplains, trap sediment, increase hydraulic diversity, and promote riparian vegetation. However, the geomorphic and hydrologic impacts of both the original beaver dams and their analogs are poorly understood. Observations in the Silvies River basin in Oregon, USA - an upland, semi-arid catchment with extremely high historic beaver populations and a presently recovering population, inform a conceptual model for valley floor evolution with beaver dams. The evolution of the beaver dam complex is characterized by eight stages of morphologic adjustment: water impoundment, sediment deposition, pond filling, multi-thread meadow creation, dam breaching, channel incision, channel widening, and floodplain development. Well-constructed beaver dams, given sufficient time and sediment flux, will evolve from a series of ponds to a multi-threaded channel flowing through a wet meadow complex. If a dam in the system fails, due to overtopping, undercutting, lack of maintenance, or abandonment, the upstream channel will concentrate into a single channel and incise, followed over time by widening once critical bank heights are exceeded. From stratigraphic, dendrochronologic, and geomorphic measurements, we are constraining average timescales associated with each stage's duration and transitional period. Measured sedimentation rates behind modern beaver dam analogs on five stream systems permit calculation of sediment flux over recent time periods, and aid in developing regional rates of sediment deposition over a range of drainage areas and gradients. Stratigraphic and dendrochronologic records provide insight into rates of incision, widening, and floodplain development. These measurements are leading to an understanding of the timescales associated with each morphologic stage and transition period, as well as the long-term implications of reintroducing beaver into a wide range of stream systems.
Arroyo el Mimbral, Mexico, K/T unit: Origin as debris flow/turbidite, not a tsunami deposit
NASA Technical Reports Server (NTRS)
Bohor, Bruce F.; Betterton, William J.
1993-01-01
Coarse, spherule-bearing, elastic units have been discovered at 10 marine sites that span the K/T boundary in northeastern Mexico. We examined one of the best exposed sites in Arroyo el Mimbral, northwest of Tampico. The Mimbral outcrop displays a layered elastic unit up to 3 m thick enclosed by marly limestones of the Mendez (Latest Maastrichian) and Velasco (Earliest Danian) Formations. At its thickest point, this channelized elastic unit is comprised of 3 subunits: (1) a basal, poorly-sorted, ungraded calcareous spherule bed 1 m thick containing relict impact glass and shocked mineral grains, (2) a massive set of laminated calcite-cemented sandstones up to 2 m thick with plant debris at its base, (3) capped by a thin (up to 20 cm) set of rippled sandstone layers separated by silty mudstone drapes containing a small (921 pg/g) iridium anomaly. This tripartite elastic unit is conformably overlain by marls of the Velasco Formation. We also visited the La Lajilla site east of Ciudad Victoria; its stratigraphy is similar to Mimbral's, but its elastic beds are thinner and less extensive laterally. The Mimbral elastic unit has been interpreted previously as being deposited by a megawave or tsunami produced by an asteroid impact on nearby Yucatan (Chicxulub crater). However, a presumed 400-m paleodepth of water at the Mimbral site, channeling of the spherule subunit into the underlying Mendez Formation marls, and the overtopping of the basal, spherule-bearing subunit by the laminated sandstone subunit, all suggest a combined debris flow/turbidite origin for this elastic unit similar to that proposed for Upper Pleistocene sand/silt beds occurring elsewhere in the Gulf of Mexico. In this latter model, the sediment source region for the elastic unit is the lower continental shelf and slope escarpment. For the K/T unit at Mimbral, we propose that thick ejecta blanket deposits composed mostly of spherules were rapidly loaded onto the lower shelf and slope from an impact-generated ejecta curtain.
Towards a Flood Severity Index
NASA Astrophysics Data System (ADS)
Kettner, A.; Chong, A.; Prades, L.; Brakenridge, G. R.; Muir, S.; Amparore, A.; Slayback, D. A.; Poungprom, R.
2017-12-01
Flooding is the most common natural hazard worldwide, affecting 21 million people every year. In the immediate moments following a flood event, humanitarian actors like the World Food Program need to make rapid decisions ( 72 hrs) on how to prioritize affected areas impacted by such an event. For other natural disasters like hurricanes/cyclones and earthquakes, there are industry-recognized standards on how the impacted areas are to be classified. Shake maps, quantifying peak ground motion, from for example the US Geological Survey are widely used for assessing earthquakes. Similarly, cyclones are tracked by Joint Typhoon Warning Center (JTWC) and Global Disaster Alert and Coordination System (GDACS) who release storm nodes and tracks (forecasted and actual), with wind buffers and classify the event according to the Saffir-Simpson Hurricane Wind Scale. For floods, the community is usually able to acquire unclassified data of the flood extent as identified from satellite imagery. Most often no water discharge hydrograph is available to classify the event into recurrence intervals simply because there is no gauging station, or the gauging station was unable to record the maximum discharge due to overtopping or flood damage. So, the question remains: How do we methodically turn a flooded area into classified areas of different gradations of impact? Here, we present a first approach towards developing a global applicable flood severity index. The flood severity index is set up such that it considers relatively easily obtainable physical parameters in a short period of time like: flood frequency (relating the current flood to historical events) and magnitude, as well as land cover, slope, and where available pre-event simulated flood depth. The scale includes categories ranging from very minor flooding to catastrophic flooding. We test and evaluate the postulated classification scheme against a set of past flood events. Once a severity category is determined, socio-economic data, such as population density, infrastructure, urbanization or equivalent information, is required for humanitarian actors to respond properly. In the end, expanded monitoring of floods, improved mitigation measures, but also effective communication of the severity of an event has the potential to reduce loss of life in future flood events.
NASA Astrophysics Data System (ADS)
Wilson, R. I.; Ramirez-Herrera, M. T.; Dengler, L. A.; Miller, K.; LaDuke, Y.
2017-12-01
The preliminary tsunami impacts from the September 7, 2017, M8.1 Tehuantepec Earthquake have been summarized in the following report: https://www.eeri.org/wp-content/uploads/EERI-Recon-Rpt-090717-Mexico-tsunami_fn.pdf. Although the tsunami impacts were not as significant as those from the earthquake itself (98 fatalities and 41,000 homes damaged), the following are highlights and lessons learned: The Tehuantepec earthquake was one of the largest down-slab normal faulting events ever recorded. This situation complicated the tsunami forecast since forecast methods and pre-event modeling are primarily associated with megathrust earthquakes where the most significant tsunamis are generated. Adding non-megathrust source modeling to the tsunami forecast databases of conventional warning systems should be considered. Offshore seismic and tsunami hazard analyses using past events should incorporate the potential for large earthquakes occurring along sources other than the megathrust boundary. From an engineering perspective, initial reports indicate there was only minor tsunami damage along the Mexico coast. There was damage to Marina Chiapas where floating docks overtopped their piles. Increasing pile heights could reduce the potential for damage to floating docks. Tsunami warning notifications did not get to the public in time to assist with evacuation. Streamlining the messaging in Mexico from the warning system directly to the public should be considered. And, for local events, preparedness efforts should place emphasis on responding to feeling the earthquake and not waiting to be notified. Although the U.S. tsunami warning centers were timely with their international and domestic messaging, there were some issues with how those messages were presented and interpreted. The use of a "Tsunami Threat" banner on the new main warning center website created confusion with emergency managers in the U.S. where no tsunami threat was expected to exist. Also, some U.S. states and territories in the Pacific were listed in both domestic and international messages, which caused confusion for American Samoa where these messages contained somewhat conflicting information. These issues are being addressed by the warning centers and the U.S. National Tsunami Hazard Mitigation Program.
NASA Astrophysics Data System (ADS)
Hoeke, R. K.; Reyns, J.; O'Grady, J.; Becker, J. M.; Merrifield, M. A.; Roelvink, J. A.
2016-02-01
Oceanic islands are widely perceived as vulnerable to sea level rise and are characterized by steep nearshore topography and fringing reefs. In such settings, near shore dynamics and (non-tidal) water level variability tends to be dominated by wind-wave processes. These processes are highly sensitive to reef morphology and roughness and to regional wave climate. Thus sea level extremes tend to be highly localized and their likelihood can be expected to change in the future (beyond simple extrapolation of sea level rise scenarios): e.g. sea level rise may increase the effective mean depth of reef crests and flats and ocean acidification and/or increased temperatures may lead to changes in reef structure. The problem is sufficiently complex that analytic or numerical approaches are necessary to estimate current hazards and explore potential future changes. In this study, we evaluate the capacity of several analytic/empirical approaches and phase-averaged and phase-resolved numerical models at sites in the insular tropical Pacific. We consider their ability to predict time-averaged wave setup and instantaneous water level exceedance probability (or dynamic wave run-up) as well as computational cost; where possible, we compare the model results with in situ observations from a number of previous studies. Preliminary results indicate analytic approaches are by far the most computationally efficient, but tend to perform poorly when alongshore straight and parallel morphology cannot be assumed. Phase-averaged models tend to perform well with respect to wave setup in such situations, but are unable to predict processes related to individual waves or wave groups, such as infragravity motions or wave run-up. Phase-resolved models tend to perform best, but come at high computational cost, an important consideration when exploring possible future scenarios. A new approach of combining an unstructured computational grid with a quasi-phase averaged approach (i.e. only phase resolving motions below a frequency cutoff) shows promise as a good compromise between computational efficiency and resolving processes such as wave runup and overtopping in more complex bathymetric situations.
The role of unsteady effusion rates on inflation in long-lived lava flow fields
NASA Astrophysics Data System (ADS)
Rader, E.; Vanderkluysen, L.; Clarke, A.
2017-11-01
The emission of volcanic gases and particles can have global and lasting environmental effects, but their timing, tempo, and duration can be problematic to quantify for ancient eruptions where real-time measurements are absent. Lava flows, for example, may be long-lasting, and their impact is controlled by the rate, tempo, and vigor of effusion. These factors are currently difficult to derive from the geologic record but can have large implications for the atmospheric impact of an eruption. We conducted a set of analogue experiments on lava flow inflation aiming at connecting lava morphologies preserved in the rock record to eruption tempo and dynamics through pulsating effusion rates. Inflation, a process where molten material is injected beneath the crust of an active lava flow and lifts it upwards, is a common phenomenon in basaltic volcanic systems. This mechanism requires three components: a) a coherent, insulating crust; b) a wide-spread molten core; and c) pressure built up beneath the crust from a sustained supply of molten material. Inflation can result in a lava flow growing tens of meters thick, even in flow fields that expand hundreds of square kilometers. It has been documented that rapid effusion rates tend to create channels and tubes, isolating the active part of the flow from the stagnant part, while slow effusion rates may cause crust to form quickly and seize up, forcing lava to overtop the crust. However, the conditions that allow for inflation of large flow fields have not previously been evaluated in terms of effusion rate. By using PEG 600 wax and a programmable pump, we observe how, by pulsating effusion rate, inflation occurs even in very low viscosity basaltic eruptions. We show that observations from inflating Hawaiian lava flows correlate well with experimental data and indicate that instantaneous effusion rates may have been 3 times higher than average effusion rates during the emplacement of the 23 January 1988 flow at Kīlauea (Hawai'i). The identification of a causal relationship between pulsating effusion rates and inflation may have implications for eruption tempo in the largest inflated flows: flood basalts.
NASA Astrophysics Data System (ADS)
Kees, C. E.; Miller, C. T.; Dimakopoulos, A.; Farthing, M.
2016-12-01
The last decade has seen an expansion in the development and application of 3D free surface flow models in the context of environmental simulation. These models are based primarily on the combination of effective algorithms, namely level set and volume-of-fluid methods, with high-performance, parallel computing. These models are still computationally expensive and suitable primarily when high-fidelity modeling near structures is required. While most research on algorithms and implementations has been conducted in the context of finite volume methods, recent work has extended a class of level set schemes to finite element methods on unstructured methods. This work considers models of three-phase flow in domains containing air, water, and granular phases. These multi-phase continuum mechanical formulations show great promise for applications such as analysis of coastal and riverine structures. This work will consider formulations proposed in the literature over the last decade as well as new formulations derived using the thermodynamically constrained averaging theory, an approach to deriving and closing macroscale continuum models for multi-phase and multi-component processes. The target applications require the ability to simulate wave breaking and structure over-topping, particularly fully three-dimensional, non-hydrostatic flows that drive these phenomena. A conservative level set scheme suitable for higher-order finite element methods is used to describe the air/water phase interaction. The interaction of these air/water flows with granular materials, such as sand and rubble, must also be modeled. The range of granular media dynamics targeted including flow and wave transmision through the solid media as well as erosion and deposition of granular media and moving bed dynamics. For the granular phase we consider volume- and time-averaged continuum mechanical formulations that are discretized with the finite element method and coupled to the underlying air/water flow via operator splitting (fractional step) schemes. Particular attention will be given to verification and validation of the numerical model and important qualitative features of the numerical methods including phase conservation, wave energy dissipation, and computational efficiency in regimes of interest.
NASA Astrophysics Data System (ADS)
Hassenruck-Gudipati, H. J.; Goudge, T. A.; Mohrig, D. C.
2017-12-01
Rivers swelled up beyond their historic high-water marks due to precipitation from Hurricane Harvey. We used Harvey-induced flooding to investigate the flow connectivity between the coastal Trinity River and its floodplain by measuring water depth and velocity, as well as sediment-transporting conditions on the natural levee that separates the two. River discharge within the study area peaked at a historic high of 3600 cubic meters per second on September 1, 2017. The levees on two river bends were investigated on September 3 and 4 in order to characterize the hydraulic connectivity between the channel and its floodplain during the early falling limb of this flood. On September 3, a river bend located approximately 28km upstream of the river mouth was visited. Water was overtopping the levee crest at this location, 30m away from the levee crest. This overland flow only experienced about a threefold reduction in average velocity to 0.16 m/s (in 2.2 m of water) 600m away from the levee crest. On September 4, a river bend approximately 59km upstream of the river mouth was investigated. Even though the river stage was at the National Weather Service major flood stage, the levee crest separating the river and floodplain was emergent. Regardless of this local disconnect between the river and its floodplain, substantial and variable drainage velocities were measured depending on drainage patterns controlled by local topography. Velocities measured in shallow water immediately adjacent to the emergent levee were low (< 0.05 m/s in 0.2 m of water). The highest drainage velocity ( 0.18 m/s in 1.7 m of water) associated with the upstream river-bend was measured at 750m from the channel and was similar in magnitude to those recorded for the distal inundating overland flow a day before on the downstream river-bend. Results from this work highlight the maintenance of high flow velocities across the distal floodplain even during its drainage phase. The transport of sediment, detrital organics, and solutes will be explored within the context of these overland flow velocities.
Norbury, Grant; Byrom, Andrea; Pech, Roger; Smith, James; Clarke, Dean; Anderson, Dean; Forrester, Guy
2013-10-01
Biotic invasions and habitat modification are two drivers of global change predicted to have detrimental impacts on the persistence of indigenous biota worldwide. Few studies have investigated how they operate synergistically to alter trophic interactions among indigenous and nonindigenous species in invaded ecosystems. We experimentally manipulated a suite of interacting invasive mammals, including top predators (cat Felis catus, ferret Mustela furo, stoat M. erminea), herbivores (rabbit Oryctolagus cuniculus, hare Lepus europaeus), and an insectivore (hedgehog Erinaceus europaeus occidentalis), and measured their effects on indigenous lizards and invertebrates and on an invasive mesopredator (house mouse Mus musculus). The work was carried out in a grassland/shrubland ecosystem that had been subjected to two types of habitat modification (widespread introduction of high-seed-producing pasture species, and areas of land use intensification by fertilization and livestock grazing). We also quantified food productivity for indigenous and invasive fauna by measuring pasture biomass, as well as seed and fruit production by grasses and shrubs. Indigenous fauna did not always increase following top-predator suppression: lizards increased on one of two sites; invertebrates did not increase on either site. Mesopredator release of mice was evident at the site where lizards did not increase, suggesting negative effects of mice on lizard populations. High mouse abundance occurred only on the predator-suppression site with regular production of pasture seed, indicating that this food resource was the main driver of mouse populations. Removal of herbivores increased pasture and seed production, which further enhanced ecological release of mice, particularly where pasture swards were overtopped by shrubs. An effect of landscape supplementation was also evident where nearby fertilized pastures boosted rabbit numbers and the associated top predators. Other studies have shown that both suppression of invasive predators and retiring land from grazing can benefit indigenous species, but our results suggest that the ensuing vegetation changes and complex interactions among invasive species can block recovery of indigenous fauna vulnerable to mesopredators. Top-down and bottom-up ecological release of mesopredators and landscape supplementation of top predators are key processes to consider when managing invaded communities in complex landscapes.
Sedimentology of gravelly Lake Lahontan highstand shoreline deposits, Churchill Butte, Nevada, USA
NASA Astrophysics Data System (ADS)
Blair, Terence C.
1999-02-01
Gravelly shoreline deposits of the latest Pleistocene highstand of Lake Lahontan occur in pristine depositional morphology, and are exposed in gravel pits along Churchill Butte in west-central Nevada. Four environments differentiated at this site are alluvial fan/colluvium, lakeshore barrier spit, lake lower-shoreface spit platform, and lake bottom. Lakeshore deposits abut, along erosional wave headcuts, either unsorted muddy to bouldery colluvium fringing Churchill Butte bedrock, or matrix-supported, cobbly and pebbly debris-flow deposits of the Silver Springs fan. The lakeshore barrier spit is dominated by granule pebble gravel concentrated by wave erosion of the colluvial and alluvial-fan facies. The lakeward side of the barrier consists of beachface deposits of well-sorted granules or pebbles in broad, planar beds 1-10 cm thick and sloping 10-15°. They interfinger downslope with thicker (10-25 cm) and less steep (5-10°) lakeward-dipping beds of fine to medium pebble gravel of the lake upper shoreface. Interstratified with the latter are 10-40-cm-thick sets of high-angle cross-beds that dip southward, alongshore. Higher-angle (15-20°), landward-dipping foresets of similar texture but poorer sorting comprise the proximal backshore on the landward side of the barrier. They were deposited during storm surges that overtopped the barrier berm. Gastropod-rich sand and mud, also deposited by storm-induced washover, are found landward of the gravel foresets in a 15-m-wide backshore pond. Algal stromatolites, ostracodes, and diatoms accumulated in this pond between storm events. The lake lower shoreface, extending from water depths of 2 to 8 m, consists of a southward-prograding spit platform built by longshore drift. The key component of this platform is large-scale sandy pebble gravel in 16° southward-dipping `Gilbert' foresets that grade at a water depth of about 6-7 m to 4°-dipping sandy toesets. A shift from bioturbated lower-shoreface sand and silt, to flat and laminated lake-bottom silt and mud, occurs between water depths of 10-40 m and over a shore-normal distance of ≥250 m. This lake-bottom mud facies, unlike the others, is areally expansive.
Tidally driven water column hydro-geochemistry in a remediating acidic wetland
NASA Astrophysics Data System (ADS)
Johnston, Scott G.; Keene, Annabelle F.; Bush, Richard T.; Sullivan, Leigh A.; Wong, Vanessa N. L.
2011-10-01
SummaryManaged tidal inundation is a newly evolved technique for remediating coastal acid sulphate soil (CASS) wetlands. However, there remains considerable uncertainty regarding the hydro-geochemical pathways and spatiotemporal dynamics of residual H + and metal(loid) mobilisation into the tidal fringe surface waters of these uniquely iron-rich landscapes. Here, we examine the hydrology and water column chemistry across the intertidal slope of a remediating CASS wetland during several tide cycles. There was extreme spatial and temporal dynamism in water column chemistry, with pH fluctuating by ˜3 units (˜3.5-6.5) during a single tide cycle. Acute acidity was spatially confined to the upper intertidal slope, reflecting surface sediment properties, and tidal overtopping is an important pathway for mobilisation of residual H + and Al 3+ to the water column. Marine derived HCO3- was depleted from surface waters migrating across the intertidal slope and a strong gradient in HCO3- was observed from the tidal fringe to the adjacent tributary channel and nearby estuary. Tidal forcing generated oscillating hydraulic gradients in the shallow fringing aquifer, favouring ebb-tide seepage and driving rapid, heterogeneous advection of groundwater on the lower intertidal slope via surface connected macropores. A combination of diffusive and advective flux across the sediment-water interface led to persistent, elevated surface water Fe 2+ (˜10-1000 μM). The geochemical processes associated with Fe 2+ mobilisation displayed distinct spatial zonation, with low pH, proton-promoted desorption occurring on the upper intertidal slope, whilst circum-neutral pH, Fe(III)-reducing processes dominated the lower intertidal slope. Arsenic was also mobilised into surface waters on the lower intertidal slope under moderate pH (˜6.0) conditions and was strongly positively correlated with Fe 2+. Saturation index values for aragonite were substantially depressed (-1 to -5) and significantly negatively correlated with elevation, thereby presenting a barrier to re-colonisation of the upper intertidal slope by calcifying benthic organisms. These findings highlight the spatially complex hydrological and geochemical controls on surface water quality that can occur in tidally inundated acid sulphate soil environments.
NASA Astrophysics Data System (ADS)
Chisolm, R. E.; McKinney, D. C.
2014-12-01
Accelerated retreat of Andean glaciers in recent decades due to a warming climate has caused the emergence and growth of glacial lakes. As these lakes continue to grow, they pose an increasing risk of glacial lake outburst floods (GLOFs). GLOFs can be triggered by moraine failures or by avalanches, rockslides, or ice calving into glacial lakes. For many decades Lake Palcacocha in the Cordillera Blanca, Peru has threatened citizens living in the city of Huaraz which was devastated by a GLOF in 1941. A safety system for Lake Palcacocha was put in place in the 1970's to control the lake level, but the lake has since grown to the point where it is once again dangerous. Overhanging ice from the glaciers above and a relatively low freeboard make the lake vulnerable to avalanches and landslides. Lake Palcacocha is used as a case study to investigate the impact of an avalanche event on the lake dynamics. Three-dimensional lake modeling in the context of glacial hazards is not common, but 3D simulations can enhance our understanding of avalanche-generated impulse waves and their downstream impacts. In this work, a 3D hydrodynamic model is used to simulate the generation of an impulse wave from an avalanche falling into the lake, wave propagation, and overtopping of the terminal moraine. These results are used as inputs to a downstream model to predict the impact from a GLOF. As lowering the level of the lake is the most likely mitigation alternative, several scenarios are considered to evaluate the impact from avalanche events with a reduction in the lake level. The results of this work can be used to evaluate the effectiveness of the current lake management system and potential lake-lowering alternatives. Use of a robust 3D lake model enables more accurate predictions of peak flows during GLOF events and the time scales of these events so that mitigation strategies can be developed that reduce the risk to communities living downstream of hazardous lakes.
Discontinuous Galerkin methods for modeling Hurricane storm surge
NASA Astrophysics Data System (ADS)
Dawson, Clint; Kubatko, Ethan J.; Westerink, Joannes J.; Trahan, Corey; Mirabito, Christopher; Michoski, Craig; Panda, Nishant
2011-09-01
Storm surge due to hurricanes and tropical storms can result in significant loss of life, property damage, and long-term damage to coastal ecosystems and landscapes. Computer modeling of storm surge can be used for two primary purposes: forecasting of surge as storms approach land for emergency planning and evacuation of coastal populations, and hindcasting of storms for determining risk, development of mitigation strategies, coastal restoration and sustainability. Storm surge is modeled using the shallow water equations, coupled with wind forcing and in some events, models of wave energy. In this paper, we will describe a depth-averaged (2D) model of circulation in spherical coordinates. Tides, riverine forcing, atmospheric pressure, bottom friction, the Coriolis effect and wind stress are all important for characterizing the inundation due to surge. The problem is inherently multi-scale, both in space and time. To model these problems accurately requires significant investments in acquiring high-fidelity input (bathymetry, bottom friction characteristics, land cover data, river flow rates, levees, raised roads and railways, etc.), accurate discretization of the computational domain using unstructured finite element meshes, and numerical methods capable of capturing highly advective flows, wetting and drying, and multi-scale features of the solution. The discontinuous Galerkin (DG) method appears to allow for many of the features necessary to accurately capture storm surge physics. The DG method was developed for modeling shocks and advection-dominated flows on unstructured finite element meshes. It easily allows for adaptivity in both mesh ( h) and polynomial order ( p) for capturing multi-scale spatial events. Mass conservative wetting and drying algorithms can be formulated within the DG method. In this paper, we will describe the application of the DG method to hurricane storm surge. We discuss the general formulation, and new features which have been added to the model to better capture surge in complex coastal environments. These features include modifications to the method to handle spherical coordinates and maintain still flows, improvements in the stability post-processing (i.e. slope-limiting), and the modeling of internal barriers for capturing overtopping of levees and other structures. We will focus on applications of the model to recent events in the Gulf of Mexico, including Hurricane Ike.
Wild, Emily C.; Weber, Matthew A.
1998-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure ROCHTH00400025 on Town Highway 40 crossing Corporation Brook, Rochester, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (FHWA, 1993). Results of a Level I scour investigation also are included in appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, from Vermont Agency of Transportation files, was compiled prior to conducting Level I and Level II analyses and is found in appendix D. The site is in the Green Mountain section of the New England physiographic province in central Vermont. The 4.97-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest on the upstream left and right overbanks, and the downstream left overbank. On the downstream right overbank, the surface cover is predominately brushland. In the study area, Corporation Brook has an incised, sinuous channel with a slope of approximately 0.04 ft/ft, an average channel top width of 37 ft and an average bank height of 6 ft. The channel bed material ranges from gravel to boulders with a median grain size (D50) of 101 mm (0.332 ft). The geomorphic assessment at the time of the Level I site visit on April 12, 1995 and Level I and II site visit on July 8, 1996, indicated that the reach was stable. The Town Highway 40 crossing of Corporation Brook is a 31-ft-long, one-lane bridge consisting of a 26-foot steel stringer span (Vermont Agency of Transportation, written communication, March 22, 1995). The opening length of the structure parallel to the bridge face is 24 ft. The bridge is supported by vertical, concrete abutments. The channel is skewed approximately 15 degrees to the opening while the opening-skew-to-roadway is 15 degrees. A scour hole 1.0 ft deeper than the mean thalweg depth was observed in the channel at the downstream bridge face during the Level I assessment. Additionally, it was observed that the left abutment footing was exposed 1.0 ft and the right abutment footing was exposed 2.0 ft. Scour countermeasures at the site included type-1 stone fill (less than 12 inches diameter) along the upstream left and right banks and the downstream left bank. Type-2 stone fill (less than 36 inches diameter) scour protection extended along the downstream right bank and the upstream and downstream ends of the abutments. Additional details describing conditions at the site are included in the Level II Summary and appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and Davis, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge was determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.1 to 1.5 ft. The worst-case contraction scour occurred at the 500-year discharge. Left abutment scour ranged from 6.5 to 7.0 ft. The worst-case left abutment scour occurred at the 500-year discharge. Right abutment scour ranged from 5.6 to 6.0 ft. The worst-case right abutment scour occurred at the incipient roadway-overtopping discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and Davis, 1995, p. 46). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Boehmler, Erick M.; Medalie, Laura
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure MONKTH00340021 on Town Highway 34 crossing Little Otter Creek, Monkton, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix D of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix C. The site is in the Champlain section of the Saint Lawrence Valley physiographic province in northwestern Vermont. The 34.1-mi2 drainage area is in a predominantly rural and forested basin with pasture in the valleys. In the vicinity of the study site, the surface cover consists of pasture. The most significant tree cover is immediately adjacent to the channel on the right bank downstream. In the study area, Little Otter Creek has a sinuous channel with a slope of approximately 0.008 ft/ft, an average channel top width of 92 feet and an average bank height of 6 feet. The predominant channel bed materials are silt and clay. Sieve analysis indicates that greater than 50% of the sample is silt and clay and thus a median grain size by use of sieve analysis was indeterminate. Therefore, the median grain size was assumed to be medium silt with a size (D50) of 0.0310 mm (0.000102 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 19 and June 20, 1996, indicated that the reach was stable. The Town Highway 34 crossing of Little Otter Creek is a 50-ft-long, one-lane bridge consisting of one 26-foot concrete span and three “boiler tube” smooth metal pipe culverts through the left road approach (Vermont Agency of Transportation, written communication, December 15, 1995). The opening length of the bridge parallel to the bridge face is 25.1 feet. The bridge is supported by vertical, concrete abutments with wingwalls on the right abutment only. The channel is skewed approximately 25 degrees to the opening. The VTAOT records indicate the opening-skew-to-roadway is 20 degrees but measurement from surveyed data suggests the skew is five degrees. The scour protection measures at the site were type-1 stone fill (less than 12 inches diameter) on the upstream and downstream embankments of the left road approach and type-2 stone fill (less than 36 inches diameter) surrounding the entrance of each culvert. Additional details describing conditions at the site are included in the Level II Summary and Appendices C and D. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 10.3 to 12.3 feet. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 8.6 to 22.5 feet. The worst-case abutment scour occurred at the 500-year discharge for the left abutment and at the incipient overtopping discharge for the right abutment. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Wild, Emily C.; Boehmler, Erick M.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure SHEFTH00410018 on Town Highway 41 crossing Millers Run, Sheffield, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the White Mountain section of the New England physiographic province in northeastern Vermont. The 16.2-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is grass upstream and downstream of the bridge while the immediate banks have dense woody vegetation. In the study area, Millers Run has an incised, straight channel with a slope of approximately 0.01 ft/ft, an average channel top width of 50 ft and an average bank height of 6 ft. The channel bed material ranges from sand to boulder with a median grain size (D50) of 50.9 mm (0.167 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 1, 1995, indicated that the reach was laterally unstable, which is evident in the moderate to severe fluvial erosion in the upstream reach. The Town Highway 41 crossing of the Millers Run is a 30-ft-long, one-lane bridge consisting of a 28-foot steel-stringer span (Vermont Agency of Transportation, written communication, March 28, 1995). The opening length of the structure parallel to the bridge face is 22.2 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 20 degrees to the opening. The computed opening-skewto-roadway is 5 degrees, while it is zero degrees in the historical form. A scour hole 1.0 ft deeper than the mean thalweg depth was observed along the left abutment during the Level I assessment. The scour protection measure at the site includes type-1 stone fill (less than 12 inches diameter) along the upstream right wingwall and the upstream left wingwall. Type-2 stone fill (less than 36 inches diameter) extends along the downstream end of the downstream left wingwall, the upstream right bank and the downstream left bank. The downstream right bank is protected by type-2 stone fill and a stone masonry wall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.2 to 1.8 ft. The worst-case contraction scour occurred at the 100-year and 500-year discharges. Left abutment scour ranged from 14.1 to 16.4 ft. The worst-case left abutment scour occurred at the 500-year discharge. Right abutment scour ranged from 6.9 to 9.3 ft. The worst-case right abutment scour occurred at the incipient roadway-overtopping discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Wild, Emily C.; Medalie, Laura
1998-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure PLYMTH00080037 on Town Highway 8 crossing Broad Brook, Plymouth, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (FHWA, 1993). Results of a Level I scour investigation also are included in appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gathered from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in appendix D. The site is in the Green Mountain section of the New England physiographic province in south-central Vermont. The 5.6-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest upstream and downstream of the bridge. In the study area, Broad Brook has an incised, sinuous channel with a slope of approximately 0.02 ft/ft, an average channel top width of 46 ft and an average bank height of 5 ft. The channel bed material ranges from gravel to boulders with a median grain size (D50) of 87.5 mm (0.287 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 3, 1995, indicated that the reach was laterally unstable due to cut-banks present on the upstream left bank and the downstream left and right banks. The Town Highway 8 crossing of Broad Brook is a 31-ft-long, one-lane bridge consisting of a 28-foot steel-stringer span (Vermont Agency of Transportation, written communication, March 22, 1995). The opening length of the structure parallel to the bridge face is 27.0 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 15 degrees to the opening while the opening-skew-to-roadway is 15 degrees. During the Level I assessment, it was observed that the left abutment footing was exposed 1.25 ft at the downstream end, and the subfooting was exposed 1 ft. Scour protection measures at the site included type-1 stone fill (less than 12 inches diameter) along the upstream right wingwall, the right abutment and the downstream right wingwall. Type-2 stone fill (less than 36 inches diameter) was along the upstream left wingwall, the upstream end of the left abutment and the downstream end of the downstream left wingwall. Additional details describing conditions at the site are included in the Level II Summary and appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and Davis, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge was determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.5 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge, which was less than the 100-year discharge. Left abutment scour ranged from 11.1 to 12.0 ft. Right abutment scour ranged from 3.0 to 7.7 ft. The worst-case abutment scour occurred at the 500-year discharge. Pier scour ranged from 6.2 to 7.1 ft. The worst-case pier scour also occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and Davis, 1995, p. 46). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Flynn, Robert H.; Burns, Ronda L.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure REDSTH00360025 on Town Highway 36 crossing the West Branch Deerfield River, Readsboro, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in south-central Vermont. The 14.5-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture on the upstream right bank and forest on the upstream left bank. The surface cover on the downstream right and left banks is primarily grass, shrubs and brush. In the study area, the West Branch Deerfield River has an incised, sinuous channel with a slope of approximately 0.02 ft/ft, an average channel top width of 65 ft and an average bank height of 4 ft. The channel bed material ranges from gravel to boulders, with a median grain size (D50) of 117 mm (0.383 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 1, 1996, indicated that the reach was stable. The Town Highway 36 crossing of the West Branch Deerfield River is a 59-ft-long, two-lane bridge consisting of one 57-foot concrete T-beam span (Vermont Agency of Transportation, written communication, September 28, 1995). The opening length of the structure parallel to the bridge face is 54 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 50 degrees to the opening while the opening-skew-to-roadway is 30 degrees. During the Level I assessment, a scour hole approximately 2 ft deeper than the mean thalweg depth was observed along the upstream right wingwall and a scour hole approximately 1 ft deeper than the mean thalweg depth was observed along the downstream left wingwall. The scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) at the downstream end of the downstream left wingwall, at the upstream end of the upstream right wingwall, at the downstream end of the right abutment, along the entire base length of the downstream right wingwall, along the upstream right bank and along the downstream left bank. A stone wall was noted along the upstream left bank. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.6 ft. The worst-case contraction scour occurred at the incipient-overtopping discharge. Abutment scour ranged from 15.1 to 16.3 ft along the left abutment and from 7.4 to 9.2 ft along the right abutment. The worst-case abutment scour occurred at the incipient-overtopping and 500-year discharges for the left abutment and at the 500-year discharge for the right abutment. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Burns, Ronda L.; Severance, Tim
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure BURKTH00070016 on Town Highway 7 crossing Dish Mill Brook, Burke, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the White Mountain section of the New England physiographic province in northeastern Vermont. The 6.0-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest except on the left bank upstream which is brushland. In the study area, Dish Mill Brook has an incised, sinuous channel with a slope of approximately 0.04 ft/ft, an average channel top width of 40 ft and an average bank height of 6 ft. The channel bed material ranges from sand to boulder with a median grain size (D50) of 94.1 mm (0.309 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 7, 1995, indicated that the reach was stable. The Town Highway 7 crossing of Dish Mill Brook is a 28-ft-long, two-lane bridge consisting of one 24-foot steel-beam span (Vermont Agency of Transportation, written communication, March 24, 1995). The opening length of the structure parallel to the bridge face is 24.8 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 35 degrees to the opening while the computed opening-skew-to-roadway is 35 degrees. A scour hole 1.0 ft deeper than the mean thalweg depth was observed along the left and right abutments during the Level I assessment. In front of the upstream and downstream left wingwalls the scour depth was only 0.5 ft, while in front of the downstream right wingwall it was 0.75 ft and in front of the upstream right wingwall it was 0.3 ft. The scour countermeasures at the site include type-1 stone fill (less than 12 inches diameter) at the downstream end of the right abutment and along the downstream right wingwall. Type-2 stone fill (less than 36 inches diameter) is along the upstream left bank, the upstream and downstream left wingwalls, and at the upstream end of the upstream right wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.5 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 6.7 to 9.3 ft. The worst-case abutment scour occurred at the 500-year discharge for the left abutment and at the incipient road-overtopping discharge for the right abutment. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Burns, Ronda L.; Wild, Emily C.
1998-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure BOLTTH00150015 on Town Highway 15 crossing Joiner Brook, Bolton, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (FHWA, 1993). Results of a Level I scour investigation also are included in appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in appendix D. The site is in the Green Mountain section of the New England physiographic province in north central Vermont. The 9.6-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture (lawn) downstream of the bridge and on the upstream right bank. The surface cover on the upstream left bank is shrub and brushland. In the study area, Joiner Brook has an incised, straight channel with a slope of approximately 0.01 ft/ft, an average channel top width of 61 ft and an average bank height of 7 ft. The channel bed material ranges from gravel to cobble with a median grain size (D50) of 43.6 mm (0.143 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 27, 1996, indicated that the reach was stable. The Town Highway 15 crossing of Joiner Brook is a 39-ft-long, two-lane bridge consisting of one 36-foot concrete tee-beam span (Vermont Agency of Transportation, written communication, November 3, 1995). The opening length of the structure parallel to the bridge face is 34.6 ft. The bridge is supported by nearly vertical, concrete abutments with wingwalls. The channel is skewed approximately 10 degrees to the opening while the opening-skew-to-roadway is zero degrees. A scour hole 1.5 ft deeper than the mean thalweg depth was observed at the downstream end of the right abutment and along the downstream right wingwall during the Level I assessment. A second scour hole 1.2 ft deeper than the mean thalweg depth was observed at the upstream end of the left abutment and along the upstream left wingwall. The left abutment footing is exposed in the area of the scour hole. Scour protection measures at the site included type-1 stone fill (less than 12 inches diameter) at the upstream end of the upstream left wingwall and at the downstream end of the downstream right wingwall and type-2 stone fill (less than 36 inches diameter) along the downstream left bank. There is also type-3 stone fill (less than 48 inches diameter) along the upstream left and right banks. Additional details describing conditions at the site are included in the Level II Summary and appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and Davis, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge was determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.8 to 3.5 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 6.9 to 15.1 ft. The worst-case abutment scour occurred at the incipient roadway-overtopping discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results.” Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and Davis, 1995, p. 46). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Burns, Ronda L.; Weber, Matthew A.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure ROYATH00540026 on Town Highway 54 crossing Broad Brook, Royalton, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in central Vermont. The 11.9-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover on the left bank upstream and downstream is pasture with trees and brush on the immediate banks. The right bank, upstream and downstream of the bridge, is forested. In the study area, Broad Brook has an incised, sinuous channel with a slope of approximately 0.01 ft/ft, an average channel top width of 37 ft and an average bank height of 4 ft. The channel bed material ranges from sand to boulders with a median grain size (D50) of 66.3 mm (0.218 ft). The geomorphic assessment at the time of the Level I site visit on April 13, 1995 and the Level II site visit on July 11, 1996, indicated that the reach was stable. The Town Highway 54 crossing of Broad Brook is a 29-ft-long, one-lane bridge consisting of one 24-foot steel-beam span with a timber deck (Vermont Agency of Transportation, written communication, March 23, 1995). The opening length of the structure parallel to the bridge face is 23.3 ft. The bridge is supported by a vertical, concrete face laid-up stone abutment with concrete wingwalls on the left and a laid-up stone abutment on the right. The channel is skewed approximately 20 degrees to the opening while the opening-skew-to-roadway is zero degrees. A scour hole 1.0 ft deeper than the mean thalweg depth was observed along the downstream end of the right abutment during the Level I assessment. Also, at the upstream end of the left abutment, the footing is exposed 0.5 ft. The scour protection measures at the site included type-2 stone fill (less than 36 inches diameter) along the upstream left bank, at the upstream end of the upstream left wingwall, along the entire length of the downstream left wingwall, and at the upstream end of the right abutment. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 1.4 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge, which was less than the 100-year discharge. Abutment scour ranged from 2.2 to 7.4 ft on the left and from 14.7 to 17.7 ft on the right. The worst-case abutment scour occurred at the incipient roadway-overtopping discharge for the left and at the 500-year discharge for the right. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Burns, Ronda L.; Wild, Emily C.
1998-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure ROCKTH00140040 on Town Highway 14 crossing the Williams River, Rockingham, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (FHWA, 1993). Results of a Level I scour investigation also are included in appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in appendix D. The site is in the New England Upland section of the New England physiographic province in southeastern Vermont. The 99.2-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture downstream of the bridge. Upstream of the bridge, the left bank is forested and the right bank is suburban. In the study area, the Williams River has an incised, sinuous channel with a slope of approximately 0.005 ft/ft, an average channel top width of 154 ft and an average bank height of 11 ft. The channel bed material ranges from silt and clay to cobble with a median grain size (D50) of 45.4 mm (0.149 ft). The geomorphic assessment at the time of the Level I and Level II site visit on September 4, 1996, indicated that the reach was stable. The Town Highway 14 crossing of the Williams River is a 106-ft-long, one-lane covered bridge consisting of two steel-beam spans with a maximum span length of 73 ft (Vermont Agency of Transportation, written communication, April 6, 1995). The opening length of the structure parallel to the bridge face is 94.5 ft. The bridge is supported by a vertical, concrete abutment with wingwalls on the left, a vertical, laid-up stone abutment on the right and a concrete pier. The channel is skewed approximately 10 degrees to the opening while the opening-skew-to-roadway is zero degrees. A scour hole 2.1 ft deeper than the mean thalweg depth was observed towards the left side of the channel under and just downstream of the bridge during the Level I assessment. Scour protection measures at the site included type-1 stone fill (less than 12 inches diameter) at the upstream end of the upstream left wingwall and type-2 stone fill (less than 36 inches diameter) along the upstream left bank and the left abutment. Additional details describing conditions at the site are included in the Level II Summary and appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and Davis, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge was determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows was zero ft. Left abutment scour ranged from 13.9 to 19.2 ft. Right abutment scour ranged from 7.0 to 11.7 ft. The worst-case abutment scour occurred at the 500-year discharge. Pier scour ranged from 18.7 to 24.7 ft and the worst case occurred at the incipient roadway-overtopping discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particlesize distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and Davis, 1995, p. 46). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Chenier Development within a Prograding Strandplain Complex
NASA Astrophysics Data System (ADS)
FitzGerald, D.; Hein, C. J.; Georgiou, I. Y.
2017-12-01
Strandplains dominate the southern coast of Brazil due to abundant shelf and local sediment and falling sea-level (2-4 m) during the past 6 ka. These plains are composed chiefly of swash-aligned sandy beach and dune ridges deposited in bedrock-framed embayments 2-5 km wide and 3-10 km long. The Tijucas Strandplain developed in a more sheltered and deeply embayed setting fronted by long peninsulas and bedrock islands, which reduce ocean wave energy. The Tijucas River bisects the plain and has provided the primary source of sediment to produce a Holocene basinal fill composed of a seaward-thickening bay mud sequence (10-16 m thick). Long-term gradual shoaling of the basin and attendant lessening wave energy produced upper strandplain foreshore and beach units that transition from landward 8-m thick sand sections to a 3-4-m thick mud unit along the present-day shoreline. The gradual lateral change of the morpho-sedimentary character of the plain is likely a product of climate-induced changes in sediment composition and supply and/or wave regime. For example, the mid-plain is defined by a series of abrupt alterations between sand-dominated beach ridges and mixed sand-and-mud cheniers. This area contains at least four chenier complexes consisting of closely spaced (25-40 m apart) 50-75 m wide ridges composed of 3-4 m thick shelly sand underlain and separated by a cohesive basin-fill clay. The seaward portion of the plain has two sandy chenier ridges each 1 m high and <3 m thick, separated by 100 m of consolidated mud with rare sand beds. Ground-penetrating radar sections show ridges contain numerous seaward-sloping beds having variable dips and multiple truncations, resulting from repeated erosional and depositional events. Expansive, thin (<50 cm) sand sheets composed of flat-lying to shallowly landward-dipping internal radar reflections extend landward from most chenier ridges that overtop inter-ridge mud. The present beach comprises the most current developing chenier. Recent storm-induced landward transport of a thin, sandy overwash fan mimics the proposed mechanism for earlier ridge-swale development. Finally, a future chenier is forming 1 km offshore where breaking waves concentrate sand. Between these two sand deposits is a shallow (< 3 m) muddy region where cores and surface samples indicate an absence of sand.
Rainfall and Erosion Response Following a Southern California Wildfire
NASA Astrophysics Data System (ADS)
Wohlgemuth, P. M.; Robichaud, P. R.; Brown, R. E.
2011-12-01
Wildfire renders landscapes susceptible to flooding and accelerated surface erosion. Consumption of the vegetation canopy and the litter or duff layer removes resistances to the agents of erosion. Moreover, changes in soil properties can restrict infiltration, increasing the effectiveness of the driving forces of rainsplash and surface runoff. However, it is unclear whether surface erosion varies linearly with rainfall amounts and intensities or if thresholds exist beyond which erosion increases in a different trajectory. The Santiago Fire burned over 11000 ha in northeastern Orange County, California in October 2007. The burn area consists of a deeply dissected mountain block underlain by sedimentary and metamorphic rocks that produce erosive soils. Regional erosion and sediment transport is triggered by winter cyclonic storms. Recording raingages were deployed across a vertical gradient within the burned area and silt fences were constructed to monitor hillslope erosion. During the study period initial storms were characterized by moderate rainfall (amounts less than 25 mm with peak 10-minute intensities of less than 10 mm per hr). Surface erosion was concomitantly minor, less than 0.4 Mg per ha. However, an unusual thunderstorm in late May 2008 produced spatially variable rainfall and consequent surface erosion across the study area. The raingage at a lower elevation site measured 41.4 mm of rain for this storm with a peak 10-minute intensity of 81 mm per hr. The silt fences were overtopped, yielding a minimum value of 18.5 Mg per ha. In contrast, the raingage at an upper elevation site recorded 19.6 mm of rain with a peak 10-minute intensity of 50 mm per hr. Surface erosion in the higher elevation sites was negligible (0.1 Mg per ha). Subsequently, individual storms exceeded 100 mm of rainfall but peak 10-minute intensities never approached those of the May thunderstorm. Erosion was moderate (mostly less than 5 Mg per ha), albeit influenced by the presence of regrowing vegetation. We therefore believe that surface erosion in the immediate postfire environment is more related to storm intensity than rainfall amount. Even allowing for site-to-site differences and site changes over the first postfire winter season, it is clear that some threshold in erosion response was crossed at the lower elevation sites during the May 2008 thunderstorm. We suggest that this represents a threshold of peak 10-minute intensity of between 50 and 80 mm per hr.
NASA Astrophysics Data System (ADS)
Braud, Isabelle; Breil, Pascal; Javelle, Pierre; Pejakovic, Nikola; Guérin, Stéphane
2017-04-01
The Yzeron periurban catchment (150 km2) is prone to flash floods leading to overflow in the downstream part of the catchment. A prevention and management plan has been approved and the set-up of a flood forecasting system is planned. The present study presents a comparison of several solutions for flood forecasting in the catchment. It is based on an extensive data collection (rain gauges, radar/rain gauge reanalyses, discharge and water level data) from this experimental catchment. A set of rainfall-runoff events leading to floods (problematic and non-problematic floods) was extracted and formed the basis for the definition of a first forecasting method. It is based on data analysis and the identification of explaining factors amongst the following: rainfall amount, intensity, antecedent rainfall, initial discharge. Several statistical methods including Factorial Analysis of Mixed Data and Classification and Regression Tree were used for this purpose. They showed that several classes of problematic floods can be identified. The first one is related to wet conditions characterized with high initial discharge and antecedent rainfall. The second class is driven by rainfall amount, initial discharge and rainfall intensity. Thresholds of these variables can be identified to provide a first warning. The second forecasting method assessed in the study is the system that will be operational in France in 2017, based on the AIGA method (Javelle et al., 2016). For this purpose, 18-year discharge simulation using the hydrological model of the AIGA method, forced using radar/rain gauges reanalysis were available at 44 locations within the catchment. The dates for which quantiles of a given return period were overtopped were identified and compared with the list of problematic events. The AIGA method was found relevant in identifying the most problematic events, but the lead time needs further investigation in order to assess the usefulness for population warning. References: Pierre Javelle, Didier Organde, Julie Demargne, Clotilde Saint-Martin, Céline de Saint-Aubin, Léa Garandeau and Bruno Janet (2016). Setting up a French national flash flood warning system for ungauged catchments based on the AIGA method. E3S Web of Conferences 7, 18010 (2016), 3rd European Conference on Flood Risk Management (FLOODrisk 2016), http://dx.doi.org/10.1051/e3sconf/20160718010
NASA Astrophysics Data System (ADS)
Khan, Firdos; Pilz, Jürgen
2014-05-01
Water resources play a vital role in agriculture, energy, industry, households and ecological balance. The main source of water to rivers is the Himalaya-Karakorum-Hindukush (HKH) glaciers and rainfall in Upper Indus Basin (UIB). There is high uncertainty in the availability of water in the rivers due to the variability of the monsoon, Western Disturbances, prolonged droughts and melting of glaciers in the HKH region. Therefore, proper management of water resources is undeniably important. Due to the growing population, urbanization and increased industrialization, the situation is likely to get worse. For the assessment of possible climate change, maximum temperature, minimum temperature and precipitation were investigated and evidence was found in favor of climate change in the region. Due to large differences between historical meteorological data and Regional Climate Model (RCM) simulated data, different statistical techniques were used for bias correction in temperature and precipitation. The hydrological model was calibrated for the period of 1995-2004 and validated for the period of 1990-1994 with almost 90 % efficiencies. After the application of bias correction techniques output of RCM, Providing Regional Climate for Impact Studies (PRECIS) were used as input data to the hydrological model to produce inflow projections at Tarbela reservoir on Indus River. For climate change assessment, the results show that the above mentioned variables have greater increasing trend under A2 scenario compared to B2 scenario. The projections of inflow to Tarbela reservoir show that overall 59.42 % and 34.27 % inflow increasing to Tarbela Reservoir during 2040-2069 under A2 and B2 scenarios will occur, respectively. Highest inflow and comparatively more shortage of water is noted in the 2020s under A2 scenario. Finally, the impacts of changing climate are investigated on the operation of the Tarbela reservoir. The results show that there will be shortage of water in some months over different years. There are no chances of overtopping of the dam during the 2020s and the 2050s under A2 and B2 scenarios. _______________________________________________________________________________KEY WORDS: Climate Model, Climate Change, Hydrological Model, Climate Change Scenarios, Tarbela Reservoir, Inflow, Outflow, Evaporation, Indus River, Calibration, Bias Correction.
NASA Astrophysics Data System (ADS)
Morgan, A. M.; Howard, A. D.; Moore, J. M.
2015-12-01
As depositional systems forming within enclosed crater basins, the Late Noachian and Hesperian -aged [1] alluvial fans on Mars (including the Peace Vallis fan in Gale crater) may be representative of the last vestiges of widespread fluvial activity on the planet's surface, an era during which the climate transitioned from a wetter early Mars to the cold and dry planet we observe today. We have constructed a landform evolution model that combines sediment transport with channel avulsion to study the evolution of a fan-forming channel network over timescales of decades to hundreds of thousands of years. We aim to address two related questions: (1) what were the characteristics of water discharge (flow magnitude and duration); and (2) what are the associated implications for the responsible climatic environment (e.g. amount and frequency of precipitation sourcing the fans). The model uses a cellular network with a grid spacing set equal to the channel width. Two end-members of sediment are transported through the channel network: gravel bedload and fine grained material that is deposited overbank as a function of distance and elevation difference from an active channel. Overbank deposition creates channel levees, which must be overtopped for the channel to undergo an avulsion. By recording the relative amounts of bedload and overbank deposition, the 3-D stratigraphy is recorded as the fan is constructed. Using measures such as channel width, relative proportions of channel versus overbank deposited sediment, and frequency of channel branching, output is statistically compared with digital elevation models that we been produced from high-resolution CTX and HiRISE stereo pairs. Our modeling suggests that the fans formed from many flow events over many thousands of years, in agreement with estimations based on geomorphological observations by [2]. We are continuing to refine the model to test for varying patterns of precipitation, duricrusts, and limits on sediment supply in the source basin catchments. [1] Grant, J.A., Wilson, S.A., 2011. Late alluvial fan formation in southern Margaritifer Terra, Mars. Geophys. Res. Lett. 38 [3] Morgan, A.M., et al., 2014. Sedimentology and climatic environment of alluvial Fans in the martian Saheki crater and a comparison with terrestrial fans in the Atacama Desert. Icarus 229
Impact of Hurricane Irma on Little Ambergris Cay, Turks and Caicos
NASA Astrophysics Data System (ADS)
Stein, N.; Grotzinger, J. P.; Hayden, A.; Quinn, D. P.; Trower, L.; Lingappa, U.; Present, T. M.; Gomes, M.; Orzechowski, E. A.; Fischer, W. W.
2017-12-01
Little Ambergris Cay (21.3° N, 71.7° W) is a 6 km long, 1.6 km wide island on the Caicos platform. The island was the focus of mapping campaigns in July 2016, August 2017, and following Hurricane Irma in September 2017. The cay is lined with lithified upper shoreface and eolian ooid grainstone forming a 1-4 m high bedrock rim that is locally breached, allowing tides to inundate an interior basin lined with extensive microbial mats. The island was mapped in July of 2016 using UAV- and satellite-based images and in situ measurements. Sedimentologic and biofacies were mapped onto a 15 cm/pixel visible light orthomosaic of the cay made from more than 1500 UAV images, and a corresponding stereogrammetric digital elevation model (DEM) was used to track how microbial mat texture varies in response to water depth. An identical UAV-based visible light map of the island was made in August 2017. On September 7th, 2017, the eye of hurricane Irma directly crossed Little Ambergris Cay with sustained winds exceeding 170 MPH. The island was remapped with a UAV on September 24th, yielding a 5 cm/pixel UAV-based visible light orthomosaic and a corresponding DEM. In situ observations and comparison with previous UAV maps shows that Irma caused significant channel and bedrock erosion, scouring and removal of broad tracts of microbial mats, and blanketing by ooid sediment of large portions of the interior basin including smothering of mats by up to 1 m of sediment. The southern rim of the cay was overtopped by water and sediment, indicating a storm surge of at least 3 m. Blocks of rock more than 1 m in length and 50 cm thick were separated from bedrock on the north side of the island and washed higher to form imbricated boulder deposits. Hundreds of 5-30 cm diameter imbricated rip-up intraclasts of rounded microbial mat now line exposed bedrock in the interior basin. Fresh ooid sediment and microbial mats were sampled from three sites: on desiccated mats 50 cm above tide level, on submerged mats in the interior basin, and on mats near the head of a newly incised channel. This work highlights how major disturbances alter sedimentological and biofacies distributions on carbonate platforms and provides insight into interpreting carbonate sedimentology and biosignatures in the rock record.
Gilbert, J.J.; Schuck-Kolben, R. E.
1987-01-01
Major flooding in the lower Pearl River basin in recent years has caused extensive damage to homes and highways in the area. In 1980 and 1983, Interstate Highway 10 and U.S. Highway 190 were overtopped. In 1983, the Interstate Highway 10 crossing was seriously damaged by the flood. The U.S. Geological Survey, in cooperation with the Louisiana Department of Transportation and Development, Office of Highways, used a two-dimensional finite-element surface-water flow model to evaluate the effects the proposed embankment modifications at Interstate Highway 10 and U.S. Highway 90 on the water-surface elevations in the lower Pearl River flood plain near Slidell, Louisiana. The proposed modifications that were considered for the 1983 flood are: (1) Removal of all highway embankments, the natural condition, (2) extension of the West Pearl River bridge by 1,000 feet at U.S. Highway 90, (3) construction of a new 250-foot bridge opening in the U.S. Highways 190 and 90, west of the intersection of the highways. The proposed highway bridge modifications also incorporated lowering of ground-surface elevations under the new bridges to sea level. The modification that provided the largest reduction in backwater, about 35 percent, was a new bridge in Interstate Highway 10. The modification of the West Pearl River bridge at U.S. Highway 90 and replacement of the bridge in U.S. Highway 190 provide about a 25% reduction in backwater each. For the other modification conditions that required structural modifications, maximum backwater computed on the west side of the flood plain ranges from 0.0 to 0.8 foot and on the east side from 0.0 to 0.6 foot. Results show that although backwater is greater on the west side of the flood plain than on the east side, upstream of highway embankments, backwater decreases more rapidly in the upstream direction on the west side of the flood plain than on the east side. Analysis of the proposed modifications indicates that backwater would still occur on the east and west sides of the flood plain, but values would be less than those computed with highway embankments in place. (Author 's abstract)
Wiche, Gregg J.; Gilbert, J.J.; Froehlich, David C.; Lee, Jonathan K.
1988-01-01
In April 1979 and April 1980, major flooding along the lower Pearl River caused extensive damage to homes located on the flood plain in the Slidell, Louisiana, area. In response to questions about causes of these floods and means of mitigating future floods, the U.S. Geological Survey, in cooperation with the Louisiana Department of Transportation and Development, Office of Highways, and the U.S. Department of Transportation, Federal Highway Administration, used a two-dimensional finite-element surface-water flow-modeling system to study the effect of four alternative modifications for improving the hydraulic characteristics of the Interstate Highway 10 crossing of the flood plain near Slidell. The analysis used the model's capability to simulate changes in flood-plain topography, flood-plain vegetative cover, and highway-embankment geometry. Compared with the existing highway crossing, the four alternative modifications reduce backwater and average velocities through bridge openings for a flood of the magnitude of the 1980 flood. The four alternatives also eliminate roadway overtopping during such a flood. For the four modifications, maximum backwater on the west side of the flood plain ranges from 0.3 to 1.1 feet and on the east side from 0.3 to 0.7 foot. Results of the alternative-model simulations show that backwater is greater on the west side of the flood plain than on the east side, but upstream from Interstate Highway 10 backwater decreases more rapidly in the upstream direction on the west side of the flood plain than on the east side. Downstream from Interstate Highway 10, modeling of the four alternatives indicates that backwater and drawdown still occur on the east and west sides of the flood plain, respectively, but are less than the values computed for the April 1980 flood with Interstate Highway 10 in place. In addition to other highway-crossing modifications, alternatives 2 and 3 include simulation of a new 2,000-foot bridge opening, and ,alternative 4 includes simulation of a 1,000-foot bridge opening. The new bridge conveys 25, 23, and 21 percent of the total computed discharge in alternatives 2, 3, and 4, respectively. The average velocity through the new bridge is 2.0, 1.9, and 3.4 feet per second for alternatives 2, 3, and 4, respectively.
NASA Astrophysics Data System (ADS)
Hubbard, B. E.; Hooper, D. M.; Mars, J. C.
2015-12-01
High resolution satellite imagery, field spectral measurements using a portable ASD spectrometer, and 2013 hyperspectral AVIRIS imagery were used to evaluate the age of the Martinez Mountain Landslide (MML) near the Salton Sea, in order to determine the relative ages of adjacent alluvial fan surfaces and the potential for additional landslides, debris flows, and floods. The Salton Sea (SS) occupies a pluvial lake basin, with ancient shorelines ranging from 81 meters to 113 meters above the modern lake level. The highest shoreline overlaps the toe of the 0.24 - 0.38 km3 MML deposit derived from hydrothermally altered granites exposed near the summit of Martinez Mountain. The MML was originally believed to be of early Holocene age. However, AVIRIS mineral maps show abundant desert varnish on the top and toe of the landslide. Desert varnish can provide a means of relative dating of alluvial fan (AF) or landslide surfaces, as it accumulates at determinable rates over time. Based on the 1) highest levels of desert varnish accumulation mapped within the basin, 2) abundant evaporite playa minerals on top of the toe of the landslide, and 3) the highest shoreline of the ancestral lake overtopping the toe of the landslide with gastropod and bivalve shells, we conclude that the MML predates the oldest alluvial fan terraces and lake sediments exposed in the Coachella and Imperial valleys and must be older than early Holocene (i.e. Late Pleistocene?). Thus, the MML landslide has the potential to be used as a spectral endmember for desert varnish thickness and thus proxy for age discrimination of active AF washes versus desert pavements. Given the older age of the MML landslide and low water levels in the modern SS, the risk from future rockslides of this size and related seiches is rather low. However, catastrophic floods and debris flows do occur along the most active AF channels; and the aftermath of such flows can be identified spectrally by montmorillonite crusts forming in recently flooded channels, as well as coarse-grained hyper-concentrated flow deposits that leave sorted (dark) heavy mineral concentrate behind. These observations, as well as supporting spectroscopic and change detection studies, will allow us to evaluate such hazards in this and similar inter-montane pluvial basins around the world.
Mass wasting features in Juventae Chasma, Mars
NASA Astrophysics Data System (ADS)
Sarkar, Ranjan; Singh, Pragya; Porwal, Alok; Ganesh, Indujaa
2016-07-01
Introduction : We report mass-wasting features preserved as debris aprons from Juventae Chasma. Diverse lines of evidence and associated geomorphological features indicate that fluidized ice or water within the wall rocks of the chasma could be responsible for mobilizing the debris. Description : The distinctive features of the landslides in Juvenate Chasma are: (1) lack of a well-defined crown or a clear-cut section at their point of origin and instead the presence of amphitheatre-headed tributary canyons; (2) absence of slump blocks; (3) overlapping of debris aprons; (4) a variety of surface textures from fresh and grooved to degraded and chaotic; (5) rounded lobes of debris aprons; (6) large variation of sizes from small lumps (~0.52 m2) to large tongue shaped ones (~ 80 m2); (7) smaller average size of landslides as compared to other chasmas; and (8) occasional preservation of fresh surficial features indicating recent emplacement. Discussion : Amphitheatre-headed tributary canyons, which are formed due to ground water sapping, indicate that the same was responsible for wall-section collapse, although a structural control cannot be completely ruled out. The emplacement of the mass wasting features preferentially at the mouths of amphitheatre-headed tributary canyons along with the rounded flow fronts of the debris suggest fluids may have played a vital role in their emplacement. The mass-wasting features in Juventae Chasma are unique compared to other landslides in Valles Marineris despite commonalities such as the radial furrows, fan-shaped outlines, overlapping aprons and overtopped obstacles. The unique set of features and close association with amphitheatre-headed tributary canyons imply that the trigger of the landslides was not structural or tectonic but possibly weakness imparted by the presence of water or ice in the pore-spaces of the wall. Craters with fluidized ejecta blankets and scalloped depressions in the surrounding plateau also support this possibility. Depending on the amounts of fluids involved at the time of emplacement, these mass movements may also qualify as debris flows. The role of fluids in the Valles Marineris landslides is still debated; however, in the Juventae Chasma landslides we see unique features which set these apart from other landslides in Valles Marineris. Further study is required to fully investigate the mechanism of emplacement of these debris.
NASA Astrophysics Data System (ADS)
Craig, M. S.; Kundariya, N.; Hayashi, K.; Srinivas, A.; Burnham, M.; Oikawa, P.
2017-12-01
Near surface geophysical surveys were conducted in the Sacramento-San Joaquin Delta for earthquake hazard assessment and to provide estimates of peat thickness for use in carbon models. Delta islands have experienced 3-8 meters of subsidence during the past century due to oxidation and compaction of peat. Projected sea level rise over the next century will contribute to an ongoing landward shift of the freshwater-saltwater interface, and increase the risk of flooding due to levee failure or overtopping. Seismic shear wave velocity (VS) was measured in the upper 30 meters to determine Uniform Building Code (UBC)/ National Earthquake Hazard Reduction Program (NEHRP) site class. Both seismic and ground penetrating radar (GPR) methods were employed to estimate peat thickness. Seismic surface wave surveys were conducted at eight sites on three islands and GPR surveys were conducted at two of the sites. Combined with sites surveyed in 2015, the new work brings the total number of sites surveyed in the Delta to twenty.Soil boreholes were made at several locations using a hand auger, and peat thickness ranged from 2.1 to 5.5 meters. Seismic surveys were conducted using the multichannel analysis of surface wave (MASW) method and the microtremor array method (MAM). On Bouldin Island, VS of the surficial peat layer was 32 m/s at a site with pure peat and 63 m/s at a site peat with higher clay and silt content. Velocities at these sites reached a similar value, about 125 m/s, at a depth of 10 m. GPR surveys were performed at two sites on Sherman Island using 100 MHz antennas, and indicated the base of the peat layer at a depth of about 4 meters, consistent with nearby auger holes.The results of this work include VS depth profiles and UBC/NEHRP site classifications. Seismic and GPR methods may be used in a complementary fashion to estimate peat thickness. The seismic surface wave method is a relatively robust method and more effective than GPR in many areas with high clay content or where surface sediments have been disturbed by human activities. GPR does however provide significantly higher resolution and better depth control in areas with suitable recording conditions.
Detection of Flood Inundation Information of the Kinu River Flooding in 2015 by Social Media
NASA Astrophysics Data System (ADS)
Shi, Y.; Sayama, T.; Takara, K. T.
2016-12-01
On September 10th, 2015, due to Kanto Tohoku heavy rainfall in Japan, an overtopping occurred from the Kinu River around 6:00. At the same day, levee breach occurred at the downstream area near Joso city in Ibaraki Prefecture, Japan. This flood disaster caused two people dead, several people injured, and enormous damages on houses and infrastructures in the city. In order to mitigate such flood disasters with large inundations, it is important to identify flood-affected areas on real-time basis. The real-time flood hazard map, which is our ultimate goal of the study, provides information on location of inundated areas during a flood. However, the technology has not been achieved yet mainly due to the difficulty in identifying the flood extent on real time. With the advantage of efficiency and wide coverage, social media, such as Twitter, appears as a good data source for collecting real-time flood information. However, there are some concerns on social media information, including the trustworthiness, and the amount of useful information in the case tweets from flood affected areas. This study collected tweet regarding the Kinu River flooding and investigated how many people in affected area posted tweets on the flooding and how the detected information is useful for the eventual goal on the real-time flood hazard mapping. The tweets were collected by three ways: advanced search on twitter web page; DISAster-information ANAlyzer system; and Twitter Application Programming Interfaces. As a result, 109 disaster relevant tweets were collected. Out of the 109 tweets, 32% of the total tweets are posted at real-time, 43% of total tweets are posted with photos and 46 tweets are related to the inundation information. 46% of the inundation related tweets were able to identify locations. In order to investigate the reliability of tweet post, the location identified tweets were marked on map to compare with the real inundation extent that measured by the Geospatial Information Authority of Japan (GSI) by helicopter on September 10, 2015. The result shows a good agreement between the actual inundation information and tweet post. Moreover, the tweet posts show an appropriate change of inundation extent. In addition, tweet posts show some additional inundated areas not reported by GSI, but confirmed the inundation after the disaster.
Burns, Ronda L.; Wild, Emily C.
1997-01-01
2 stone fill (less than 36 inches diameter) along the upstream right bank and downstream left bank and around the upstream left and right wingwalls. Type- 3 stone fill (less than 48 inches diameter) is located along the base of the left abutment in the scour hole, at the end of the downstream left wingwall and along the upstream left bank. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.4 to 0.9 ft. The worst-case contraction scour occurred at the incipient-overtopping discharge and the 100-year discharge. Abutment scour ranged from 10.7 to 13.6 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Playing against nature: improving earthquake hazard mitigation
NASA Astrophysics Data System (ADS)
Stein, S. A.; Stein, J.
2012-12-01
The great 2011 Tohoku earthquake dramatically demonstrated the need to improve earthquake and tsunami hazard assessment and mitigation policies. The earthquake was much larger than predicted by hazard models, and the resulting tsunami overtopped coastal defenses, causing more than 15,000 deaths and $210 billion damage. Hence if and how such defenses should be rebuilt is a challenging question, because the defences fared poorly and building ones to withstand tsunamis as large as March's is too expensive,. A similar issue arises along the Nankai Trough to the south, where new estimates warning of tsunamis 2-5 times higher than in previous models raise the question of what to do, given that the timescale on which such events may occur is unknown. Thus in the words of economist H. Hori, "What should we do in face of uncertainty? Some say we should spend our resources on present problems instead of wasting them on things whose results are uncertain. Others say we should prepare for future unknown disasters precisely because they are uncertain". Thus society needs strategies to mitigate earthquake and tsunami hazards that make economic and societal sense, given that our ability to assess these hazards is poor, as illustrated by highly destructive earthquakes that often occur in areas predicted by hazard maps to be relatively safe. Conceptually, we are playing a game against nature "of which we still don't know all the rules" (Lomnitz, 1989). Nature chooses tsunami heights or ground shaking, and society selects the strategy to minimize the total costs of damage plus mitigation costs. As in any game of chance, we maximize our expectation value by selecting the best strategy, given our limited ability to estimate the occurrence and effects of future events. We thus outline a framework to find the optimal level of mitigation by balancing its cost against the expected damages, recognizing the uncertainties in the hazard estimates. This framework illustrates the role of the uncertainties and the need to candidly assess them. It can be applied to exploring policies under various hazard scenarios and mitigating other natural hazards.ariation in total cost, the sum of expected loss and mitigation cost, as a function of mitigation level. The optimal level of mitigation, n*, minimizes the total cost. The expected loss depends on the hazard model, so the better the hazard model, the better the mitigation policy (Stein and Stein, 2012).
Miller, David; Haddon, Elizabeth; Langenheim, Victoria; Cyr, Andrew J.; Wan, Elmira; Walkup, Laura; Starratt, Scott W.
2018-01-01
Hinkley Valley in the Mojave Desert, near Barstow about 140 km northeast of Los Angeles and midway between Victorville Valley and the Lake Manix basin, contains a thick sedimentary sequence delivered by the Mojave River. Our study of sediment cores drilled in the valley indicates that Hinkley Valley was probably a closed playa basin with stream inflow from four directions prior to Mojave River inflow. The Mojave River deposited thick and laterally extensive clastic wedges originating from the southern valley that rapidly filled much of Hinkley Valley. Sedimentary facies representing braided stream, wetland, delta, and lacustrine depositional environments all are found in the basin fill; in some places, the sequence is greater than 74 m (245 ft) thick. The sediment is dated in part by the presence of the ~631 ka Lava Creek B ash bed low in the section, and thus represents sediment deposition after Victorville basin was overtopped by sediment and before the Manix basin began to be filled. Evidently, upstream Victorville basin filled with sediment by about 650 ka, causing the ancestral Mojave River to spill to the Harper and Hinkley basins, and later to Manix basin.Initial river sediment overran wetland deposits in many places in southern Hinkley Valley, indicating a rapidly encroaching river system. These sediments were succeeded by a widespread lake (“blue” clay) that includes the Lava Creek B ash bed. Above the lake sediment lies a thick section of interlayered stream sediment, delta and nearshore lake sediment, mudflat and/or playa sediment, and minor lake sediment. This stratigraphic architecture is found throughout the valley, and positions of lake sediment layers indicate a successive northward progression in the closed basin. A thin overlapping sequence at the north end of the valley contains evidence for a younger late Pleistocene lake episode. This late lake episode, and bracketing braided stream deposits of the Mojave River, indicate that the river avulsed through the valley, rather than continuing toward Lake Manix, during the late Pleistocene. Two dextral strike-slip fault zones, the Lockhart and the Mt. General, fold and displace the distinctive stratigraphic units, as well as surficial late Pleistocene and Holocene deposits. The sedimentary architecture and the two fault zones provide a framework for evaluating groundwater flow in Hinkley Valley.
Hydraulic shock waves in an inclined chute contraction
NASA Astrophysics Data System (ADS)
Jan, C.-D.; Chang, C.-J.
2009-04-01
A chute contraction is a common structure used in hydraulic engineering for typical reasons such as increase of bottom slope, transition from side channel intakes to tunnel spillways, reduction of chute width due to bridges, transition structures in flood diversion works, among others. One of the significant chute contractions in Taiwan is that used in the Yuanshantzu Flood Diversion Project of Keelung River. The diversion project is designed to divert flood water from upper Keelung River into East Sea with a capasity of 1,310 cubic meters per second for mitigating the flood damage of lower part of Keelung River basin in Northern Taiwan. An inclined chute contraction is used to connect Keelung River and a diversion turnel. The inlet and outlet works of the diversion project is located at Ruifang in the Taipei County of north Taiwan. The diameter of diversion tunnel is 12 meters and the total length of tunnel is 2,484 meters. The diversion project has been completed and successfully executed many times since 2004 to lower the water level of Keelung River in typhoon seasons for avioding flooding problems in the lower part of Keelung River basin. Flow in a chute contraction has complicated flow pattern due to the existence of shock waves in it. A simple and useful calculation procedure for the maximum height and its position of shock waves is essentially needed for the preliminary design stage of a chute contraction. Hydraulic shock waves in an inclined chute contraction were experimentally and numerically investigated in this study with the consideration of the effects of sidewall deflection angle, bottom inclination angle and Froude number of approaching flow. The flow pattern of hydraulic shock waves in a chute contraction was observed. The main issue of designing chute contraction is to estimate the height and position of maximum shock wave for the consideration of freeboards. Achieving this aim, the experimental data are adopted and analyzed for the shock angle, the height of maximum shock wave and the corresponding position of maximum shock wave. The dimensionless relations for the shock angle, the height of maximum shock wave and the corresponding position of maximum shock wave are obtained by regression analysis. These empirical regression relations, basically relating to the sidewall deflection angle, bottom angle and approach Froude number, are very useful for further practical engineering applications in chute contraction design for avoiding flow overtopping.
Intense hurricane strikes in southeastern New England since A.D. 1000
NASA Astrophysics Data System (ADS)
Donnelly, J. P.; Ettinger, R.; Cleary, P.
2001-05-01
Intense, category 3, 4, and 5 landfalling hurricanes pose a significant threat to lives and resources in coastal areas. Intense hurricane strikes also play a significant role in transporting sediments and shaping coastal landforms. Potential links between human-induced climate change and the frequency and intensity of tropical cyclones and the recent concentration of resources and population in areas where intense hurricanes may strike necessitate examination of decadal-to-millennial-scale variability in hurricane activity. The National Oceanic and Atmospheric Administration hurricane activity records for the western Atlantic Ocean only go back to the late 19th century. In the northeast United States historical records of hurricanes date back 370 years. We use stratigraphic evidence from coastal wetlands to extend the record of intense hurricane strikes into the prehistoric period in southeastern New England. Storm surge and wave action associated with intense storms can overtop barrier islands, remove sand and gravel from the beach and nearshore environment and deposit these sediments across the surface of coastal wetlands. In a regime of rising sea level, organic wetland sediments accumulate on top of these storm-induced deposits, preserving a record of past storms. We reconstructed storm deposition records within coastal marshes from eastern Connecticut to Cape Cod, Massachusetts. We matched these records to the historic record of storms and established the age of prehistoric storm deposits dating back about 1000 years with isotopic and stratigraphic dating techniques. The ages of storm deposits at all sites correlate to historic intense hurricane strikes. Prehistoric storm deposits can repeatedly be correlated among multiple sites and are of similar character and extent to the more recent deposits that we attribute to historic intense hurricane strikes. Therefore these older storm deposits were also likely deposited during prehistoric intense hurricanes. We documented at least eight deposits consistent with intense hurricane strikes in the last 1000 years. We identified deposits associated with historic intense hurricanes that occurred in A.D. 1954, 1938, 1869, 1815, 1638 and/or 1635. In addition we identified deposits likely associated with prehistoric intense hurricane strikes that occurred in A.D. 1400-1450, 1300-1400, and 1100-1150. These records indicate no apparent correlation between the frequency of intense hurricane landfalls in southeastern New England and the Little Ice Age and Medieval Warm Period climate oscillations.
Late Holocene climate change at Goat Lake, Kenai Mountains, south-central Alaska
NASA Astrophysics Data System (ADS)
Daigle, T. A.; Kaufman, D. S.
2006-12-01
Lake sediments, glacier extents, and tree rings were used to reconstruct late Holocene climate changes from Goat Lake in the Kenai Mountains, south-central Alaska (60° 14' N/149° 54' W). Two sediment cores (3.7 and 5.6 m long) were dated with 16 AMS 14C ages and record changes in watershed (organic- matter content) and within-lake (biogenic silica) productivity since ~9500 cal yr BP. Sediment analyses focused on the last 1000 yr; this interval includes a sharp transition from gyttja to inorganic mud at ~1660 AD, which marks the fist time since Pleistocene deglaciation that the north goat outlet glacier (NGO) of the Harding Icefield overtopped the drainage divide at 590 m asl to spill meltwater into Goat Lake. One 14C age of ~1535 AD from a subfossil log in the NGO valley requires ~125 yr for the NGO to thicken 150 m to the elevation of the drainage divide where it remained until ~1930. Since ~1930, the NGO has thinned 150 m and retreated 1.4 km. Equilibrium-line altitudes (ELA) were reconstructed for 12 cirque glaciers nearby Goat Lake based on the accumulation-area ratio (AAR) method following field mapping of ice-marginal features formed during the maximum Little Ice Age (LIA) in the 19th century. Maximum LIA ELA data (AAR = 0.58) were compared with 1950 ELA and yield an average lowering of 50 ± 20 m. Application of the local lapse rate of 0.47°C/100 m indicates an average ablation-season temperature reduction of 0.3°C during the maximum LIA compared to 1950, assuming no change in winter precipitation. A new tree-ring chronology from 27 hemlock trees in the Goat Lake watershed correlates with mean March through August temperature from Kenai airport (r = 0.35) and a 207 yr reconstruction indicates an average temperature reduction of 1.0°C from 1800-1900 compared with 1930-1950. Assuming no change in winter precipitation, then a 1°C cooling should have been associated with an ELA lowering by 200 m. This did not occur, and we suggest that some degree of accumulation-season drying is required to reconcile the summer temperature lowering with the limited reduction in ELA. A reduction in accumulation-season precipitation, in turn, implies a weakening of the Aleutian low pressure system during the LIA.
Eruptive history of South Sister, Oregon Cascades
Fierstein, J.; Hildreth, W.; Calvert, A.T.
2011-01-01
South Sister is southernmost and highest of the Three Sisters, three geologically dissimilar stratovolcanoes that together form a spectacular 20km reach along the Cascade crest in Oregon. North Sister is a monotonously mafic edifice as old as middle Pleistocene, Middle Sister a basalt-andesite-dacite cone built between 48 and 14ka, and South Sister is a basalt-free edifice that alternated rhyolitic and intermediate modes from 50ka to 2ka (largely contemporaneous with Middle Sister). Detailed mapping, 330 chemical analyses, and 42 radioisotopic ages show that the oldest exposed South Sister lavas were initially rhyolitic ~50ka. By ~37ka, rhyolitic lava flows and domes (72-74% SiO2) began alternating with radially emplaced dacite (63-68% SiO2) and andesite (59-63% SiO2) lava flows. Construction of a broad cone of silicic andesite-dacite (61-64% SiO2) culminated ~30ka in a dominantly explosive sequence that began with crater-forming andesitic eruptions that left fragmental deposits at least 200m thick. This was followed at ~27ka by growth of a steeply dipping summit cone of agglutinate-dominated andesite (56-60.5% SiO2) and formation of a summit crater ~800m wide. This crater was soon filled and overtopped by a thick dacite lava flow and then by >150m of dacitic pyroclastic ejecta. Small-volume dacite lavas (63-67% SiO2) locally cap the pyroclastic pile. A final sheet of mafic agglutinate (54-56% SiO2) - the most mafic product of South Sister - erupted from and drapes the small (300-m-wide) present-day summit crater, ending a summit-building sequence that lasted until ~22ka. A 20kyr-long-hiatus was broken by rhyolite eruptions that produced (1) the Rock Mesa coulee, tephra, and satellite domelets (73.5% SiO2) and (2) the Devils Chain of ~20 domes and short coulees (72.3-72.8% SiO2) from N-S vent alignments on South Sister's flanks. The compositional reversal from mafic summit agglutinate to recent rhyolites epitomizes the frequently changing compositional modes of the South Sister locus throughout its lifetime. South Sister is part of a reach of the Cascades unusually active in the last 50kyr, characterized by high vent density, N-S vent alignments, and numerous eruptive units of true rhyolite (≥ 72% SiO2) that distinguishes it from much of the Quaternary Cascade arc; these are eruptive expressions of the complex confluence of arc and intraplate magmatic-tectonic regimes.
Eruptive history of South Sister, Oregon Cascades
NASA Astrophysics Data System (ADS)
Fierstein, Judy; Hildreth, Wes; Calvert, Andrew T.
2011-10-01
South Sister is southernmost and highest of the Three Sisters, three geologically dissimilar stratovolcanoes that together form a spectacular 20 km reach along the Cascade crest in Oregon. North Sister is a monotonously mafic edifice as old as middle Pleistocene, Middle Sister a basalt-andesite-dacite cone built between 48 and 14 ka, and South Sister is a basalt-free edifice that alternated rhyolitic and intermediate modes from 50 ka to 2 ka (largely contemporaneous with Middle Sister). Detailed mapping, 330 chemical analyses, and 42 radioisotopic ages show that the oldest exposed South Sister lavas were initially rhyolitic ~ 50 ka. By ~ 37 ka, rhyolitic lava flows and domes (72-74% SiO 2) began alternating with radially emplaced dacite (63-68% SiO 2) and andesite (59-63% SiO 2) lava flows. Construction of a broad cone of silicic andesite-dacite (61-64% SiO 2) culminated ~ 30 ka in a dominantly explosive sequence that began with crater-forming andesitic eruptions that left fragmental deposits at least 200 m thick. This was followed at ~ 27 ka by growth of a steeply dipping summit cone of agglutinate-dominated andesite (56-60.5% SiO 2) and formation of a summit crater ~ 800 m wide. This crater was soon filled and overtopped by a thick dacite lava flow and then by > 150 m of dacitic pyroclastic ejecta. Small-volume dacite lavas (63-67% SiO 2) locally cap the pyroclastic pile. A final sheet of mafic agglutinate (54-56% SiO 2) - the most mafic product of South Sister - erupted from and drapes the small (300-m-wide) present-day summit crater, ending a summit-building sequence that lasted until ~ 22 ka. A 20 kyr-long-hiatus was broken by rhyolite eruptions that produced (1) the Rock Mesa coulee, tephra, and satellite domelets (73.5% SiO 2) and (2) the Devils Chain of ~ 20 domes and short coulees (72.3-72.8% SiO 2) from N-S vent alignments on South Sister's flanks. The compositional reversal from mafic summit agglutinate to recent rhyolites epitomizes the frequently changing compositional modes of the South Sister locus throughout its lifetime. South Sister is part of a reach of the Cascades unusually active in the last 50 kyr, characterized by high vent density, N-S vent alignments, and numerous eruptive units of true rhyolite (≥ 72% SiO 2) that distinguishes it from much of the Quaternary Cascade arc; these are eruptive expressions of the complex confluence of arc and intraplate magmatic-tectonic regimes.
NASA Astrophysics Data System (ADS)
Bedford, D.
2012-12-01
We studied the effects of small-scale roughness on overland flow/runoff and the spatial pattern of infiltration. Our semi-arid sites include a grassland and shrubland in Central New Mexico and a shrubland in the Eastern Mojave Desert. Vegetation exerts strong controls on small-scale surface roughness in the form of plant mounds and other microtopography such as depressions and rills. We quantified the effects of densely measured soil surface heterogeneity using model simulations of runoff and infiltration. Microtopographic roughness associated with vegetation patterns, on the scale of mm-cm's in height, has a larger effect on runoff and infiltration than spatially correlated saturated conductivity. The magnitude and pattern of the effect of roughness largely depends on the vegetation and landform type, and rainfall depth and intensity. In all cases, runoff and infiltration amount and patterns were most strongly affected by depression storage. In the grassland we studied in central New Mexico, soil surface roughness had a large effect on runoff and infiltration where vegetation mounds coalesced, forming large storage volumes that require filling and overtopping in order for overland flow to concentrate into runoff. Total discharge over rough surfaces was reduced 100-200% compared to simulations in which no surface roughness was accounted for. For shrublands, total discharge was reduced 30-40% by microtopography on gently sloping alluvial fans and only 10-20% on steep hillslopes. This difference is largely due to the lack of storage elements on steep slopes. For our sites, we found that overland flow can increase infiltration by up to 2.5 times the total rainfall by filling depressions. The redistribution of water via overland flow can affect up to 20% of an area but varies with vegetation type and landform. This infiltration augmentation by overland flow tends to occur near the edges of vegetation canopies where overland flow depths are deep and infiltration rates are moderate. Infiltration augmentation is greatest in microtopographic depressions and flow threads. These results show that some vegetation-landform settings are efficient at trapping and concentrating the primary limiting resource, and demonstrate the importance of micro-scale soil characteristics for the ecohydrologic function of semi-arid environments. Since other essential attributes for plant ecosystems, such as nutrients, likely co-vary with water availability, further research is needed to elucidate ecosystem dynamics that may lead to self-organized behavior and determine thresholds for ecosystem stability.
Menges, C.M.
2008-01-01
Stratigraphic and geomorphic analyses reveal that the regional drainage basin of the modern Amargosa River formed via multistage linkage of formerly isolated basins in a diachronous series of integration events between late Miocene and latest Pleistocene-Holocene time. The 275-km-long Amargosa River system drains generally southward across a large (15,540 km 2) watershed in southwestern Nevada and eastern California to its terminus in central Death Valley. This drainage basin is divided into four major subbasins along the main channel and several minor subbasins on tributaries; these subbasins contain features, including central valley lowlands surrounded by highlands that form external divides or internal paleodivides, which suggest relict individual physiographic-hydrologic basins. From north to south, the main subbasins along the main channel are: (1) an upper headwaters subbasin, which is deeply incised into mostly Tertiary sediments and volcanic rocks; (2) an unincised low-gradient section within the Amargosa Desert; (3) a mostly incised section centered on Tecopa Valley and tributary drainages; and (4) a west- to northwest-oriented mostly aggrading lower section along the axis of southern Death Valley. Adjoining subbasins are hydro-logically linked by interconnecting narrows or canyon reaches that are variably incised into formerly continuous paleodivides. The most important linkages along the main channel include: (1) the Beatty narrows, which developed across a Tertiary bedrock paleodivide between the upper and Amargosa Desert subbasins during a latest Miocene-early Pliocene to middle Pleistocene interval (ca. 4-0.5 Ma); (2) the Eagle Mountain narrows, which cut into a mostly alluvial paleodivide between the Amar-gosa Desert and Tecopa subbasins in middle to late Pleistocene (ca. 150-100 ka) time; and (3) the Amargosa Canyon, which formed in late middle Pleistocene (ca. 200140 ka) time through a breached, actively uplifting paleodivide between the Tecopa and southern Death Valley subbasins. Collectively, the interconnecting reaches represent discrete integration events that incrementally produced the modern drainage basin starting near Beatty sometime after 4 Ma and ending in the Salt Creek tributary in the latest Pleistocene to Holocene (post-30 ka). Potential mechanisms for drainage integration across paleodivides include basin overtopping from sedimentary infilling above paleodivide elevations, paleolake spillover, groundwater sapping, and (or) headward erosion of dissecting channels in lower-altitude subbasins. These processes are complexly influenced by fluvial responses to factors such as climatic change, local base-level differences across divides, and (or) tectonic activity (the latter only recognized in Amargosa Canyon). ?? 2008 The Geological Society of America.
NASA Astrophysics Data System (ADS)
Baer, Patrick; Huggel, Christian; Frey, Holger; Chisolm, Rachel; McKinney, Daene; McArdell, Brian; Portocarrero, Cesar; Cochachin, Alejo
2016-04-01
Huaraz as the largest city in Cordillera Blanca has faced a major disaster in 1941, when an outburst flood from Lake Palcacocha killed several thousand people and caused widespread destruction. Recent studies on glacial lake outburst flood (GLOF) modelling and early warning systems focussed on Lake Palcacocha which has regrown after the 1941 event, from a volume of half a million m3 in 1974 to a total volume of more than 17 million m3 today. However, little research has been conducted so far concerning the situation of other lakes in the Quillcay catchment, namely Lake Tullparaju (12 mill. m3) and Cuchillacocha (2.5 mill. m3), which both also pose a threat to the city of Huaraz. In this study, we modelled the cascading processes at Lake Tullparaju and Lake Cuchillacocha including rock/ice avalanches, flood wave propagation in the lake and the resulting outburst flood and debris flows. We used the 2D model RAMMS to simulate ice avalanches. Model output was used as input for analytical 2D and 3D calculations of impact waves in the lakes that allowed us to estimate dam overtopping wave height. Since the dimension of the hanging glaciers above all three lakes is comparable, the scenarios in this study have been defined similar to the previous study at Lake Palcacocha. The flow propagation model included sediment entrainment in the steeper parts of the catchment, adding up to 50% to the initial flow volume. The results for total travel time as well as for inundated areas and flow depth and velocity in the city of Huaraz are comparable to the previous studies at Lake Palcacocha. This underlines the importance of considering also these lakes within an integral hazard analysis for the city of Huaraz. A main challenge for modelling GLOFs in the Quillcay catchment using RAMMS is the long runout distance of over 22 km combined with the very low slope gradient of the river. Further studies could improve the process understanding and could focus on more detailed investigations of the stability of the steep glaciers and rock faces, or on incorporation of bathymetric and geotechnical dam information with the application of 3D wave generation simulation. First applications of the beta version of the RAMMS erosion model for GLOF sediment entrainment are promising and could be refined with additional field studies.
Southwest Washington littoral drift restoration—Beach and nearshore morphological monitoring
Stevens, Andrew W.; Gelfenbaum, Guy; Ruggiero, Peter; Kaminsky, George M.
2012-01-01
A morphological monitoring program has documented the placement and initial dispersal of beach nourishment material (280,000 m3) placed between the Mouth of the Columbia River (MCR) North Jetty and North Head, at the southern end of the Long Beach Peninsula in southwestern Washington State. A total of 21 topographic surveys and 8 nearshore bathymetric surveys were performed between July 11, 2010, and November 4, 2011. During placement, southerly alongshore transport resulted in movement of nourishment material to the south towards the MCR North Jetty. Moderate wave conditions (significant wave height around 4 m) following the completion of the nourishment resulted in cross-shore sediment transport, with most of the nourishment material transported into the nearshore bars. The nourishment acted as a buffer to the more severe erosion, including dune overtopping and retreat, that was observed at the northern end of the study area throughout the winter. One year after placement of the nourishment, onshore transport and beach recovery were most pronounced within the permit area and to the south toward the MCR North Jetty. This suggests that there is some long-term benefit of the nourishment for reducing erosion rates locally, although the enhanced recovery also could be due to natural gradients in alongshore transport causing net movement of the sediment from north to south. Measurements made during the morphological monitoring program documented the seasonal movement and decay of nearshore sand bars. Low-energy conditions in late summer resulted in onshore bar migration early in the monitoring program. Moderate wave conditions in the autumn resulted in offshore movement of the middle bar and continued onshore migration of the outer bar. High-energy wave conditions early in the winter resulted in strong cross-shore transport and creation of a 3-bar system along portions of the coast. More southerly wave events occurred later in the winter and early spring and coincided with the complete loss of the outer bar and net loss of sediment from the study area. These data suggest that bar decay may be an important mechanism for exporting sediment from Benson Beach north to the Long Beach Peninsula. The measurements presented in this report represent one component of a broader monitoring program designed to track the movement of nourishment material on the beach and shoreface at this location, including continuous video monitoring (Argus), in situu measurements of hydrodynamics, and a physical tracer experiment. Field data from the monitoring program will be used to test numerical models of hydrodynamics and sediment transport and to improve the capability of numerical models to support regional sediment management.
Hazard Map in Huaraz-Peru due to a Glacial Lake Outburst Flood from Palcacocha Lake
NASA Astrophysics Data System (ADS)
Somos-Valenzuela, M. A.; Chisolm, R. E.; McKinney, D. C.; Rivas, D.
2013-12-01
Palcacocha lake is located in the Ancash Region in the Cordillera Blanca at an elevation of 4,567 m in the Quilcay sub-basin, province of Huaraz, Peru. The lake drains into the Quebrada Cojup, which subsequently drains into the Quilcay River. The Quilcay River passes through the City of Huaraz emptying its water into the Santa River, which is the primary river of the basin. This location has a special interest since the city of Huaraz, which is located at the bottom of the Quilcay sub-basin, was devastated by a glacial lake outburst flood (GLOF) released from Lake Palcacocha on December 13, 1941. In that event, many lost their lives. In recent years Palcacocha has grown to the point where the lake is once again dangerous. Ice/rock avalanches from the steep surrounding slopes can now directly reach the lake. A process chain of debris flow and hyper-concentrated flow from Lake Palcacocha could easily reach the city of Huaraz with the current lake volume. Local authorities and people living in Huaraz are concerned about the threat posed by Lake Palcacocha, and consequently they have requested technical support in order to investigate the impacts that a GLOF could have in the city of Huaraz. To assess the hazard for the city of Huaraz a holistic approach is used that considers a chain of processes that could interact in a GLOF event from Lake Palcacocha. We assume that an avalanche from Palcaraju glacier, located directly above the lake, could be a GLOF trigger, followed by the formation of waves in the lake that can overtop the damming moraine starting an erosive process. The wave and avalanche simulations are described in another work, and here we use those results to simulate the propagation of the inundation downstream using FLO-2D, a model that allows us to include debris flow. GLOF hydrographs are generated using a dam break module in Mike 11. Empirical equations are used to calculate the hydrograph peaks and calibrate the inundation model. In order to quantify the hazard we implement a combination of criteria from different countries (Switzerland, Austria and the U.S.), these criteria consider that the level of flooding hazard in an urban area is a function of the maximum velocity and inundation depth. We have found that 30,000 people, approximately one third of the city of Huaraz, could be affected by a GLOF from Lake Palcacocha.
NASA Astrophysics Data System (ADS)
Couston, L.; Mei, C.; Alam, M.
2013-12-01
A large number of lakes are surrounded by steep and unstable mountains with slopes prone to failure. As a result, landslides are likely to occur and impact water sitting in closed reservoirs. These rare geological phenomena pose serious threats to dam reservoirs and nearshore facilities because they can generate unexpectedly large tsunami waves. In fact, the tallest wave experienced by contemporary humans occurred because of a landslide in the narrow bay of Lituya in 1958, and five years later, a deadly landslide tsunami overtopped Lake Vajont's dam, flooding and damaging villages along the lakefront and in the Piave valley. If unstable slopes and potential slides are detected ahead of time, inundation maps can be drawn to help people know the risks, and mitigate the destructive power of the ensuing waves. These maps give the maximum wave runup height along the lake's vertical and sloping boundaries, and can be obtained by numerical simulations. Keeping track of the moving shorelines along beaches is challenging in classical Eulerian formulations because the horizontal extent of the fluid domain can change over time. As a result, assuming a solid slide and nonbreaking waves, here we develop a nonlinear shallow-water model equation in the Lagrangian framework to address the problem of transient landslide-tsunamis. In this manner, the shorelines' three-dimensional motion is part of the solution. The model equation is hyperbolic and can be solved numerically by finite differences. Here, a 4th order Runge-Kutta method and a compact finite-difference scheme are implemented to integrate in time and spatially discretize the forced shallow-water equation in Lagrangian coordinates. The formulation is applied to different lake and slide geometries to better understand the effects of the lake's finite lengths and slide's forcing mechanism on the generated wavefield. Specifically, for a slide moving down a plane beach, we show that edge-waves trapped by the shoreline and free-waves moving away from it coexist. On an open coast, these two types of waves would never interact, but because of the lake's finite dimensions, here we show that local inundation height maxima are due to wave superposition on the shoreline. These interactions can be dramatic near the lake's corners. For instance, in a rectangular lake delimited by two opposite and plane beaches and two vertical walls, we find that a landslide tsunami results in an inundation height at a corner 50% larger than anywhere else. The nonlinear and linear models produce different inundation maps, and here we show that maximum wave runups can be increased by up to 56% when nonlinear terms are included.
Satellite Monitoring and Characterization of the 2010 Rockslide-Dammed Lake Gojal, North Pakistan
NASA Astrophysics Data System (ADS)
Leonard, G. J.; Kargel, J. S.; Crippen, R. E.; Evans, S. G.; Delaney, K. B.; Schneider, J. F.
2010-12-01
On January 4, 2010, a landslide blocked the Hunza River at Attabad, northern Pakistan (36.308°N, 74.820°E). The landslide destroyed the village of Attabad killing 19 people, and formed a dam approximately 1200m long, 350 meters wide, and 125 meters high. The flow of the Hunza river was blocked for 144 days, forming Lake Gojal. In addition to inundating several villages and submerging 22 km of the regionally critical Karakoram Highway, >25,000 people have been displaced or remain cut off from overland connection with the rest of the country. Lake overtopping began on May 29 via a 15m deep spillway excavated through the saddle of the dam. Remarkably, the slowly eroding natural structure remains largely intact and currently represents a new geologic feature, although a threat remains from possible catastrophic outburst flooding. We have monitored growth of the lake with multi-temporal satellite imagery collected from ASTER (Advanced Spaceborne Thermal and Reflection Radiometer) and ALI (Advanced Land Imager) sensors. We applied NASA’s ASTER Global Digital Elevation Model (GDEM) and SRTM-3 digital terrain data, along with field data obtained onsite by Schneider, and by Pakistan’s NDMA to derive volumes of the growing lake. Lake size peaked during mid-summer when it was ~22 km long, 12 km2, 119m deep, and contained 540 to 620 Mm3 water (SRTM-3 and GDEM +5m global correction estimates respectively). Our estimates indicated lake volumes three to four times higher than media quotes, and before spillover, were used to improve predictions of possible flood discharge and disaster management planning. Estimates of valley inflow based on a 31-year hydrographic history (Archer, D., 2003, Jour. Hydrology 274, 198-210) are consistent with our volume infilling estimates. As early as April 14 our volume assessments, coupled with hydrographic and seepage data were used to project a spillover date range of May 28-June 2, bracketing the actual overflow date. Additionally, we have applied vegetation indices (NDVI), landcover classifications, and image differencing change detection techniques to obtain reconnaissance level characterizations of lake-flood affected areas, including flooding of agricultural lands. Our successful prediction of lake growth and initial estimates of affected lands highlights the effectiveness of GIS methods applied to modern satellite datasets, and indicates the importance of monitoring natural hazard events with remote sensing, which can provide rapid assessments and augment onsite observations for disaster management support.
NASA Astrophysics Data System (ADS)
Gaillard, Fabrice; Tarits, Pascal; Massuyeau, Malcolm; David, Sifre; Leila, Hashim; Emmanuel, Gardes
2013-04-01
The asthenosphere has classically been considered as a convective layer, with its viscosity decreased by the presence of 100's ppm water in olivine, and being overtopped by a rigid and dry lithosphere. It, however, needs a new conceptual definition as the presence of water seems not able to affect the rheology of olivine; furthermore, properties such as electrical conductivity and seismic wave's velocity are not sensibly affected by water content in olivine, leaving the geophysical features of the asthenosphere unexplained. An asthenosphere impregnated by low melt fractions is consistent with constraints on melting behavior of C-O-H-bearing peridotites and may also better explain electrical conductivity and seismic features. The challenge is therefore to confront and reconcile the complexity of mantle melting in the C-O-H system with geophysical observations. This work reviews and discusses several key properties of the asthenosphere and relates their vertical and lateral heterogeneities to geodynamic processes. The first discussion is about the top of the Lithosphere-Asthenosphere boundary in the oceanic mantle. The discontinuity identified by seismic and electrical surveys is located at an average depth of 65km and is weakly influenced by the age, and therefore, the temperature of the lithosphere. This puzzling observation is shown here to be in perfect line the onset of peridotite melting in presence of both H2O and CO2. Mantle melting is therefore expected at 65 km depth, where the melt is essentially carbonatitic, inducing weakening and imposing transition in the regime of thermal transfer. Deeper, the melt evolve to silica-richer compositions. Twenty years of petrological investigations on processes that control mantle redox state unanimously concur on an increasingly reduced mantle with increasing depth. The conventional wisdom defines garnet as being increasingly abundant and increasingly able to concentrate ferric iron with increasing depth. Such oxygen pump results in an increasingly reduced mantle with depth. Recent surveys have calibrated the carbon-carbonate redox transition at mantle pressure and have located its depth around 180-250 km (depth of redox melting); Deeper, only diamond is stable; Shallower, carbonates, mostly in its molten state, are expected. This petrological model is confronted to the most recent geophysical observations. Such observations indicate that melting must occur at depth down to 400 km, which conflict with the concept of redox melting. What is the composition of the melt? Hydrous silicate melt or hydrous carbonated melt? What does it mean in terms of deep upper mantle redox state?
Counterfactual Volcano Hazard Analysis
NASA Astrophysics Data System (ADS)
Woo, Gordon
2013-04-01
The historical database of past disasters is a cornerstone of catastrophe risk assessment. Whereas disasters are fortunately comparatively rare, near-misses are quite common for both natural and man-made hazards. The word disaster originally means 'an unfavourable aspect of a star'. Except for astrologists, disasters are no longer perceived fatalistically as pre-determined. Nevertheless, to this day, historical disasters are treated statistically as fixed events, although in reality there is a large luck element involved in converting a near-miss crisis situation into a disaster statistic. It is possible to conceive a stochastic simulation of the past to explore the implications of this chance factor. Counterfactual history is the exercise of hypothesizing alternative paths of history from what actually happened. Exploring history from a counterfactual perspective is instructive for a variety of reasons. First, it is easy to be fooled by randomness and see regularity in event patterns which are illusory. The past is just one realization of a variety of possible evolutions of history, which may be analyzed through a stochastic simulation of an array of counterfactual scenarios. In any hazard context, there is a random component equivalent to dice being rolled to decide whether a near-miss becomes an actual disaster. The fact that there may be no observed disaster over a period of time may belie the occurrence of numerous near-misses. This may be illustrated using the simple dice paradigm. Suppose a dice is rolled every month for a year, and an event is recorded if a six is thrown. There is still an 11% chance of no events occurring during the year. A variety of perils may be used to illustrate the use of near-miss information within a counterfactual disaster analysis. In the domain of natural hazards, near-misses are a notable feature of the threat landscape. Storm surges are an obvious example. Sea defences may protect against most meteorological scenarios. However, if a major storm surge happens to arrive at a high astronomical tide, sea walls may be overtopped and flooding may ensue. In the domain of geological hazards, periods of volcanic unrest may generate precursory signals suggestive of imminent volcanic danger, but without leading to an actual eruption. Near-miss unrest periods provide vital evidence for assessing the dynamics of volcanoes close to eruption. Where the volcano catalogue has been diligently revised to include the maximum amount of information on the phenomenology of unrest periods, dynamic modelling and hazard assessment may be significantly refined. This is illustrated with some topical volcano hazard examples, including Montserrat and Santorini.
Erwin, Susannah O.; Jacobson, Robert B.; Elliott, Caroline M.
2017-01-01
We present a quantitative analysis of habitat availability in a highly regulated lowland river, comparing a restored reach with two reference reaches: an un-restored, channelized reach, and a least-altered reach. We evaluate the effects of channel modifications in terms of distributions of depth and velocity as well as distributions and availability of habitats thought to be supportive of an endangered fish, the pallid sturgeon (Scaphirhynchus albus). It has been hypothesized that hydraulic conditions that support food production and foraging may limit growth and survival of juvenile pallid sturgeon. To evaluate conditions that support these habitats, we constructed two-dimensional hydrodynamic models for the three study reaches, two located in the Lower Missouri River (channelized and restored reaches) and one in the Yellowstone River (least-altered reach). Comparability among the reaches was improved by scaling by bankfull discharge and bankfull channel area. The analysis shows that construction of side-channel chutes and increased floodplain connectivity increase the availability of foraging habitat, resulting in a system that is more similar to the reference reach on the Yellowstone River. The availability of food-producing habitat is low in all reaches at flows less than bankfull, but the two reaches in the Lower Missouri River – channelized and restored – display a threshold-like response as flows overtop channel banks, reflecting the persistent effects of channelization on hydraulics in the main channel. These high lateral gradients result in punctuated ecological events corresponding to flows in excess of bankfull discharge. This threshold effect in the restored reach remains distinct from that of the least-altered reference reach, where hydraulic changes are less abrupt and overbank flows more gradually inundate the adjacent floodplain. The habitat curves observed in the reference reach on the Yellowstone River may not be attainable within the channelized system on the Missouri River, but the documented hydraulic patterns can be used to inform ongoing channel modifications. Although scaling to bankfull dimensions and discharges provides a basis for comparing the three reaches, implementation of the reference reach concept was complicated by differences in flow-frequency distributions among sites. In particular, habitat availability in the least-altered Yellowstone River reach is affected by increased frequency of low-flow events (less than 0.5 times bankfull flow) and moderately high-flow events (greater than 1.5 times bankfull flow) compared to downstream reaches on the Lower Missouri River.
NASA Astrophysics Data System (ADS)
Roberts, N. J.; Evans, S. G.
2009-12-01
Gigantic (> 1 Gm3) landslides are high-magnitude, low-frequency extremes of mass movements. They are important factors in topographic evolution and hazard in mountain regions due to their magnitude. However, few examples exist for study because of their infrequency. Consequently, controls on the location and size gigantic landslides remain poorly understood. Re-examination of the Seymareh (Saidmarreh) rock avalanche, Zagros fold-thrust belt, shows it to be the largest sub-aerial landslide on Earth (initial failure volume 38 Gm3), thus representing the upper magnitude limit for terrestrial landslides. Detailed examination of the source area (including orbital remote sensing, geotechnical investigation and structural mapping) provides new insights into controls on the size and mobility of gigantic landslides. The gigantic Early Holocene rockslide initiated on the northeast limb of Kabir Kuh, the largest anticline in the Zagros fold-thrust belt, and involved the simultaneous failure of a rock mass measuring 15 km along strike. The rockslide transformed into a rock avalanche that ran-out 19.0 km, filling two adjacent valleys and overtopping an intervening low mountain ridge. The failure involved 220 m of competent jointed limestone (Asmari Formation) underlain by 580 m of weaker mudrock-dominated units. Geologic structure, geomechanical strength and topography of the source slope strongly controlled failure initiation. Extreme landslide dimensions resulted in part from extensive uniform pre-failure stability, produced by structural and topographic features related to the large scale of the Kabir Kuh anticline. High continuity bedding planes determined the large lateral extent along strike. Bedding normal joints, the breached nature of the anticline and fluvial undercutting at the slope toe accommodated expansive lateral, headscarp and toe release, respectively, necessary for extensive failure. Geomechanically weak units at depth aided the penetration of the failure surface into the source slope while low bedding dip (ca. 19°) allowed kinematic freedom of a particularly thick sequence to move downslope. Prevention of gradual rockmass removal by smaller-magnitude, more frequent denudation ensured its preservation for later simultaneous failure. The overall failure surface (11°) cut across weaker beds and finally breached the Asmari carapace by break-out at the base of the source slope. Relative relief of the source slope on Kabir Kuh was modest (1350 m on average) indicating that uniform structural and topographic conditions along strike, shallow bedding dips, and the geomechnical properties of the source rock mass were more important in determining the magnitude of the landslide that forms the upper magnitude limit for subaerial landslides.
Seismic hazards and land-use planning
Nichols, Donald R.; Buchanan-Banks, Jane M.
1974-01-01
Basic earth-science data are necessary for a realistic assessment of seismic hazards and as a basis for limiting corrective land-use controls only to those areas of greatest hazard. For example, the location, character, and amount of likely displacement and activity of surface faulting can be predicted if detailed geologic maps and seismic data are available and are augmented by field studies at critical localities. Because few structures can withstand displacement of their foundations, they should be located off active fault traces, the distance varying with the character of faulting, the certainty with which fault traces are known, and the importance of the structure. Recreational activities and other nonoccupancy land uses should be considered for fault zone areas where land is under pressure for development; elsewhere, such areas should remain as open space. Two methods of predicting ground shaking effects have applications to land-use decisions: (1) Relative earthquake effects can be related to firmness of the ground and can be used in a gross way to allocate population density in the absence of more sophisticated analyses; and (2) intensity maps, based on, (a) damage from former earthquakes, or (b) a qualitative analyses of geologic units added to a design earthquake, can be helpful both for general and specific plans. Theoretical models are used with caution to predict ground motion for critical structures to be located at specific sites with unique foundation conditions. Fully adequate methods of assessing possible shaking remain to be developed. Where land-use decisions do not reflect likely ground shaking effects, stringent building codes are needed, particularly for important structures. Ground failure (landsliding, ground cracking and lurching, differential settlement, sand boils, and subsidence) commonly results from liquefaction, loss of soil strength, or compaction. Areas suspected of being most likely to fail should not be developed unless detailed site studies can demonstrate the hazard does not exist or can be overcome. Various methods can be used to reduce the high, long-term public costs that follow development of unstable ground. However, areas subject to tectonic deformation generally cannot be predicted nor can effects of such deformation be minimized. Large water waves, such as produced by tsunamis, seiches, and dam failure or overtopping, can be anticipated in many places. Their effects can be lessened by land-use regulations similar to flood-plain zoning, restrictions on location of critical structures, and appropriate warning systems. Many local, state, and federal government agencies, universities, and private consultants may be able to assist planners by advising them of pertinent data and where those data can be obtained. Interpretation of the data for an evaluation of seismic risk commonly requires a team of planners, geologists, and soil and structural engineers.
The Role of Anthropogenic Stratigraphy in River Restoration Projects
NASA Astrophysics Data System (ADS)
Evans, J. E.; Webb, L. D.
2012-12-01
As part of a river restoration project and removal of a low-head dam on the Ottawa River (northwestern Ohio and southeastern Michigan) in 2007, a longer-term project was initiated to assess anthropogenic changes of the Ottawa River fluvial system. A composite stratigraphic section 4.5 m in length was constructed by stratigraphic correlation from three trenches up to 2.5 m in depth and 14 vibracores up to 2.5 m in length, all within a small region (<0.5 km2 in area). At various stratigraphic levels, the cores contain a suite of anthropogenic materials including fragments of bricks and cement blocks, pieces of modern ceramics, fragments of plastic and rubber tires, intact or pieces of glass bottles, and one horizon of displaced railroad ties. Age control for the composite section is provided by 4 14C dates, 6 OSL dates, and one bottle with a date stamp. Two prominent flood horizons are indicated in multiple trenches or cores, and identified as the historic floods of 1913 and 1959. The data show the following major changes in the fluvial system over time: (1) prior to approximately 5 Ka, the river system was transporting mineral-rich sediment and formed meandering point-bar sequences approximately 1.5 m thick; (2) between approximately 5 Ka and 200 YBP, the river system was transporting organic-rich sediment (i.e., blackwater stream) bordered by riparian wetlands accumulating peat (part of the regional "Great Black Swamp" discovered by settlers from eastern North America); (3) between approximately 200 YBP and the early 1960s the river system was transporting mineral-rich sediment (i.e., brownwater stream), probably sourced from extensive land clearance for agriculture, which backfilled and overtopped the previous riparian wetlands and produced an series of thin channel fills interpreted as rapidly shifting avulsional channels; (4) since the early 1960s, sediment supply has exceeded sediment conveyance capacity, leading to vertical aggradation of approximately 1.7 m, creating the fill-terrace morphology evident today; and (5) overlapping with the previous stage, channel incision and lateral channel migration has produced a fluvial system dominated by bank erosion, logjams due to tree fall, and degraded substrate with fluvial pavements. Stage 4 is interpreted as a time-specific (1950s-1960s) sediment pulse related to extensive urbanization of the lower drainage basin, while the partly overlapping stage 6 is interpreted as fluvial reworking of intrabasinal storage of legacy sediment under conditions of lower sediment input (reforested suburban housing developments) but higher water inputs (increasingly urbanized stormwater networks). Regarding river restoration, it is clear that most of the modern fluvial system is a recent and highly manipulated system that may not be sustainable.
NASA Astrophysics Data System (ADS)
Lee, Han Soo; Yamashita, Takao; Fujiwara, Akimasa
2010-05-01
Global environmental leader (GEL) education programme at graduate school for international development and cooperation (IDEC) in Hiroshima University is an education and training programme for graduate students especially from developing countries in Asian region to build and enhance their ability to become international environmental leaders. Through this programme, they will participate in regular course works and other activities to learn how to cope with the various environment and resource management issues from global to regional scales toward a low-carbon society via multi-disciplinary approaches considering sustainable development and climate change. Under this GEL programme, there are five different research sub-groups as follows assuming a cause-effect relationship among interacting components of social, economic, and environmental systems; 1) urban system design to prevent global warming, 2) wise use of biomass resources, 3) environmental impact assessment, 4) policy and institutional design, and 5) development of environmental education programs. Candidate students of GEL programme belong to one of the five research sub-groups, perform their researches and participate in many activities under the cross-supervisions from faculty members of different sub-groups. Under the third research group for environmental impact assessment, we use numerical models named as regional environment simulator (RES) as a tool for research and education for assessing the environmental impacts due to natural hazards. Developed at IDEC, Hiroshima University, RES is a meso-scale numerical model system that can be used for regional simulation of natural disasters and environmental problems caused by water and heat circulation in the atmosphere, hydrosphere, and biosphere. RES has three components: i) atmosphere-surface waves-ocean part, ii) atmosphere-land surface process-hydrologic part, and iii) coastal and estuarine part. Each part is constructed with state-of-the-art public domain numerical models that are combined synchronously by an own-developed model coupler. Therefore, RES can provide detailed insights from various aspects of interaction processes between each component in the earth system. For instance, RES has been used for the study of storm surges and the abnormally high ocean waves caused by typhoons, cyclones, hurricanes, and winter monsoon winds in Asian region; dam lake circulation; air-sea interaction of momentum, heat, and tracer material exchange; heavy rainfall and runoff simulation; estuarine circulation with cohesive sediment transport; and wave overtopping in coastal regions. Most recently, a project on the impact of reduced discharge of freshwater and sediment from the Yangtze River basin on the adjacent East China Sea has been initiated by using the RES. Under the GEL programme, we found the RES can be an important and useful tool for graduate students not only from science and engineering background but also from social science so as to evaluate their policy and institutional design.
Sedimentary architecture of a Plio-Pleistocene proto-back-arc basin: Wanganui Basin, New Zealand
NASA Astrophysics Data System (ADS)
Proust, Jean-Noël; Lamarche, Geoffroy; Nodder, Scott; Kamp, Peter J. J.
2005-11-01
The sedimentary architecture of active margin basins, including back-arc basins, is known only from a few end-members that barely illustrate the natural diversity of such basins. Documenting more of these basins types is the key to refining our understanding of the tectonic evolution of continental margins. This paper documents the sedimentary architecture of an incipient back-arc basin 200 km behind the active Hikurangi subduction margin, North Island, New Zealand. The Wanganui Basin (WB) is a rapidly subsiding, Plio-Pleistocene sedimentary basin located at the southern termination of the extensional back-arc basin of the active Central Volcanic Region (TVZ). The WB is asymmetric with a steep, thrust-faulted, outer (arc-ward) margin and a gentle inner (craton-ward) margin. It contains a 4-km-thick succession of Plio-Pleistocene sediments, mostly lying offshore, composed of shelf platform sediments. It lacks the late molasse-like deposits derived from erosion of a subaerial volcanic arc and basement observed in classical back-arc basins. Detailed seismic stratigraphic interpretations from an extensive offshore seismic reflection data grid show that the sediment fill comprises two basin-scale mega-sequences: (1) a Pliocene (3.8 to 1.35 Ma), sub-parallel, regressive "pre-growth" sequence that overtops the uplifted craton-ward margin above the reverse Taranaki Fault, and (2) a Pleistocene (1.35 Ma to present), divergent, transgressive, "syn-growth" sequence that onlaps: (i) the craton-ward high to the west, and (ii) uplifted basement blocks associated with the high-angle reverse faults of the arc-ward margin to the east. Along strike, the sediments offlap first progressively southward (mega-sequence 1) and then southeastward (mega-sequence 2), with sediment transport funnelled between the craton- and arc-ward highs, towards the Hikurangi Trough through the Cook Strait. The change in offlap direction corresponds to the onset of arc-ward thrust faulting and the rise of the Axial Ranges at ca 1.75 Ma, resulting in 5100-5700 m of differential subsidence across the fault system. Sedimentation has propagated south- to southeast-ward over the last 4 Myrs at the tip of successive back-arc graben, volcanic arcs and the associated thermally uplifted parts of the North Island, following the southward migration of the Hikurangi subduction margin. Subsidence occurred by mantle flow-driven flexure, the result of active down-drag of the lithosphere by locking of the Hikurangi subduction interface and sediment loading. The WB is considered to be a proto-back-arc basin that represents the intermediate stage of evolution of an epicratonic shelf platform, impacted by active margin processes.
NASA Astrophysics Data System (ADS)
Cochachin, Alejo; Frey, Holger; Huggel, Christian; Strozzi, Tazio; Büechi, Emanuel; Cui, Fanpeng; Flores, Andrés; Saito, Carlos
2017-04-01
The Safuna glacial lakes (77˚ 37' W, 08˚ 50' S) are located in the headwater of the Tayapampa catchment, in the northernmost part of the Cordillera Blanca, Peru. The upper lake, Laguna Safuna Alta at 4354 m asl has formed in the 1960s behind a terminal moraine of the retreating Pucajirca Glacier, named after the peak south of the lakes. Safuna Alta currently has a volume of 15 x 106 m3. In 2002 a rock fall of several million m3 from the proximal left lateral moraine hit the Safuna Alta lake and triggered an impact wave which overtopped the moraine dam and passed into the lower lake, Laguna Safuna Baja, which absorbed most of the outburst flood from the upper lake, but nevertheless causing loss in cattle, degradation of agricultural land downstream and damages to a hydroelectric power station in Quitaracsa gorge. Event reconstructions showed that the impact wave in the Safuna Alta lake had a runup height of 100 m or more, and weakened the moraine dam of Safuna Alta. This fact, in combination with the large lake volumes and the continued possibility for landslides from the left proximal moraine pose a considerable risk for the downstream settlements as well as the recently completed Quitaracsa hydroelectric power plant. In the framework of a project funded by the European Space Agency (ESA), the hazard situation at the Safuna Alta lake is assessed by a combination of satellite radar data analysis, field investigations, and slope stability modeling. Interferometric analyses of the Synthetic Aperture Radar (InSAR) of ALOS-1 Palsar-1, ALOS-2 Palsar-2 and Sentinel-1 data from 2016 reveal terrain displacements of 2 cm y-1 in the detachment zone of the 2002 rock avalanche. More detailed insights into the characteristics of these terrain deformations are gained by repeat surveys with differential GPS (DGPS) and tachymetric measurements. A drone flight provides the information for the generation of a high-resolution digital elevation model (DEM), which is used for the modeling of the geomechanical slope stability using the W/Slope and UDEC models. Model application, however, is limited due to data scarcity regarding geotechnical slope properties, which needed to be estimated. The combination of these data products, measurements and model results provide important information for the estimation of potential source areas for future slope collapses and involved volumes. Eventually, such information can be used for the definition of possible rock avalanche scenarios and related chain reactions in order to elaborate a hazard map for resulting lake outburst floods. At the same time, the potential for an operational slope stability monitoring system at this site will be evaluated.
Effects of climate change on wave height at the coast
NASA Astrophysics Data System (ADS)
Wolf, J.
2003-04-01
To make progress towards the ultimate objective of predicting coastal vulnerability to climate change, we need to predict the probability of extreme values of sea level and wave height, and their likely variation with changing climate. There is evidence of changes in sea level and wave height on various time-scales. For example, the North Atlantic Oscillation appears to be responsible for increasing wave height in the North Atlantic over recent decades. The impact of changes in wave height in the North Atlantic at the coastline in the North Sea, the Hebrides/Malin Shelf and the English Channel will be quite different. Three different, and contrasting areas are examined The effect of changing sea levels, due to global warming and changes in tides and surge height and frequency, is combined with increases in offshore wave height. Coastal wave modelling, using the WAM and SWAN wave models, provides a useful tool for examining the possible impacts of climate change at the coast. This study is part of a Tyndall Centre project which is examining the vulnerability of the UK coast to changing wave climate and sea level. These changes are likely to be especially important in low-lying areas with coastal wetlands such as the north Norfolk coast, which has been selected as a detailed case study area. In this area there are offshore shallow banks and extensive inter-tidal areas. There are transitions from upper marsh to freshwater grazing marshes, sand dunes, shingle beaches, mudflats and sandflats. Many internationally important and varied habitats are threatened by rising sea levels and changes in storminess due to potential climate change effects. Likely changes in overtopping of coastal embankments, inundation of intertidal areas, sediment transport and coastal erosion are examined. Changes in low water level may be important as well as high water. The second area of study is Christchurch Bay in the English Channel. The English Channel is exposed to swell from the North Atlantic and a moderate tidal range. The coastline is quite developed with popular beaches. There are defended and undefended stretches of coastline. The waves reaching the coastline are modulated by the strong tidal streams in the Solent and shoal areas like Shingles Bank. The Sea of the Hebrides is an area important for fishing and tourism, but is the part of the UK exposed to the most severe waves, being most directly connected with the North Atlantic. The UK’s first wave power plant is in operation on Islay. Sea level changes are likely to be relatively unimportant but changes in wave climate could have a direct impact on local economic activity.
NASA Astrophysics Data System (ADS)
Harrison, T. N.; Malin, M. C.; Edgett, K. S.
2009-12-01
Eight new flows in martian mid-latitude gullies have been found using the MRO Context Camera and MGS Mars Orbiter Camera. Each formed during 1999-2009. Using MRO HiRISE images, we find that the morphology and inferred emplacement behavior of these features is consistent with those of debris flows fluidized by a liquid medium and not by dry, granular flows. Evidence comes from the patterns of flow around obstacles, ponding in and subsequent overtopping of topographic depressions, and super-elevation of deposits on channel banks where the channels change direction, attributes consistent with a liquid but not with fluid-like granular flow. Additional evidence includes anastomoses in distal reaches and lobate terminations. Of the 8 flows, 3 have formation dates constrained to within a single Mars year (although not the same year); these 3 formed during autumn to early spring, demonstrating that summer warming is not participating in creating the liquid (i.e., that would melt snow or ice). The new gully deposits indicate that some gullies are currently active, suggesting that Mars has liquid water today and it occasionally appears on the planet’s surface. NASA’s Mars Exploration Program has focused on the “follow the water” theme and is now shifting toward “habitability” and life detection. Places where liquid water comes to the Martian surface today warrant detailed investigation. Martian astrobiology involves the search for evidence of extinct and extant life. Discovery of ancient sedimentary rocks shifted emphasis from the Viking-era pursuit of present-day microbial life to MSL’s focus on habitable environments. Recent descriptions of contemporary methane production have renewed interest in searching for extant life. Missions to locations of potential present day life, whether indicated by methane or liquid water, must deal with the associated planetary protection issues (they are “special regions”). More information about such locations is critical. Present mission planning is focused on methane (a 2016 trace gas orbiter), while the on-going gully activity is not being subjected to the same level of examination. Active gully locations might represent the optimum landing site for the much-discussed astrobiology rover mission (2018), provided additional information can be developed (i.e., the occurrence and recurrence rates and locations, and further evidence of the role of water). Long-term orbital monitoring at high resolution plus lander deployment from orbit after activity is detected are key gully mission objectives, as are the development of vehicles that can negotiate steep slopes and instruments that can detect sub-surface ice and/or water. As an added benefit, rather than learning only about a specific landing site, the knowledge gained from a single landed mission at a gullied site would be applicable to thousands of other locations on Mars.
Hoogestraat, Galen K.
2011-01-01
Extensive information about the construction of dams or potential downstream hazards in the event of a dam breach is not available for many small reservoirs within the Black Hills National Forest. In 2009, the U.S. Forest Service identified the need for reconnaissance-level dam-breach assessments for four of these reservoirs within the Black Hills National Forest (Iron Creek, Horsethief, Lakota, and Mitchell Lakes) with the potential to flood downstream structures. Flood hydrology and dam-breach hydraulic analyses for the four selected reservoirs were conducted by the U.S. Geological Survey in cooperation with the U.S. Forest service to estimate the areal extent of downstream inundation. Three high-flow breach scenarios were considered for cases when the dam is in place (overtopped) and when a dam break (failure) occurs: the 100-year recurrence 24-hour precipitation, 500-year recurrence peak flow, and the probable maximum precipitation. Inundation maps were developed that show the estimated extent of downstream floodwaters from simulated scenarios. Simulation results were used to determine the hazard classification of a dam break (high, significant, or low), based primarily on the potential for loss of life or property damage resulting from downstream inundation because of the flood surge.The inflow design floods resulting from the two simulated storm events (100-year 24-hour and probable maximum precipitation) were determined using the U.S. Army Corps of Engineers Hydrologic Engineering Center Hydrologic Modeling System (HEC-HMS). The inflow design flood for the 500-year recurrence peak flow was determined by using regional regression equations developed for streamflow-gaging stations with similar watershed characteristics. The step-backwater hydraulic analysis model, Hydrologic Engineering Center's River Analysis System (HEC-RAS), was used to determine water-surface profiles of in-place and dam-break scenarios for the three inflow design floods that were simulated. Inundation maps for in-place and dam-break scenarios were developed for the area downstream from the dam to the mouth of each stream.Dam-break scenarios for three of the four reservoirs assessed in this study were rated as low hazards owing to absence of permanent structures downstream from the dams. Iron Creek Lake's downstream channel to its mouth does not include any permanent structures within the inundation flood plains. For the two reservoirs with the largest watershed areas, Lakota and Mitchell Lake, the additional floodwater surge resulting from a dam break would be minor relative to the magnitude of the large flood streamflow into the reservoirs, based on the similar areal extent of inundation for the in-place and dam-break scenarios as indicated by the developed maps. A dam-break scenario at Horsethief Lake is rated as a significant hazard because of potential lives-in-jeopardy in downstream dwellings and appreciable economic loss.
Atwater, Brian F.; ten Brink, Uri S.; Buckley, Mark; Halley, Robert S.; Jaffe, Bruce E.; López-Venegas, Alberto M.; Reinhardt, Eduard G.; Tuttle, Maritia P.; Watt, Steve; Wei, Yong
2012-01-01
Waters from the Atlantic Ocean washed southward across parts of Anegada, east-northeast of Puerto Rico, during a singular event a few centuries ago. The overwash, after crossing a fringing coral reef and 1.5 km of shallow subtidal flats, cut dozens of breaches through sandy beach ridges, deposited a sheet of sand and shell capped with lime mud, and created inland fields of cobbles and boulders. Most of the breaches extend tens to hundreds of meters perpendicular to a 2-km stretch of Anegada’s windward shore. Remnants of the breached ridges stand 3 m above modern sea level, and ridges seaward of the breaches rise 2.2–3.0 m high. The overwash probably exceeded those heights when cutting the breaches by overtopping and incision of the beach ridges. Much of the sand-and-shell sheet contains pink bioclastic sand that resembles, in grain size and composition, the sand of the breached ridges. This sand extends as much as 1.5 km to the south of the breached ridges. It tapers southward from a maximum thickness of 40 cm, decreases in estimated mean grain size from medium sand to very fine sand, and contains mud laminae in the south. The sand-and-shell sheet also contains mollusks—cerithid gastropods and the bivalve Anomalocardia—and angular limestone granules and pebbles. The mollusk shells and the lime-mud cap were probably derived from a marine pond that occupied much of Anegada’s interior at the time of overwash. The boulders and cobbles, nearly all composed of limestone, form fields that extend many tens of meters generally southward from limestone outcrops as much as 0.8 km from the nearest shore. Soon after the inferred overwash, the marine pond was replaced by hypersaline ponds that produce microbial mats and evaporite crusts. This environmental change, which has yet to be reversed, required restriction of a former inlet or inlets, the location of which was probably on the island’s south (lee) side. The inferred overwash may have caused restriction directly by washing sand into former inlets, or indirectly by reducing the tidal prism or supplying sand to post-overwash currents and waves. The overwash happened after A.D. 1650 if coeval with radiocarbon-dated leaves in the mud cap, and it probably happened before human settlement in the last decades of the 1700s. A prior overwash event is implied by an inland set of breaches. Hypothetically, the overwash in 1650–1800 resulted from the Antilles tsunami of 1690, the transatlantic Lisbon tsunami of 1755, a local tsunami not previously documented, or a storm whose effects exceeded those of Hurricane Donna, which was probably at category 3 as its eye passed 15 km to Anegada’s south in 1960.
A New Approach to Monitoring Coastal Marshes for Persistent Flooding
NASA Astrophysics Data System (ADS)
Kalcic, M. T.; Underwood, L. W.; Fletcher, R. M.
2012-12-01
Many areas in coastal Louisiana are below sea level and protected from flooding by a system of natural and man-made levees. Flooding is common when the levees are overtopped by storm surge or rising rivers. Many levees in this region are further stressed by erosion and subsidence. The floodwaters can become constricted by levees and trapped, causing prolonged inundation. Vegetative communities in coastal regions, from fresh swamp forest to saline marsh, can be negatively affected by inundation and changes in salinity. As saltwater persists, it can have a toxic effect upon marsh vegetation causing die off and conversion to open water types, destroying valuable species habitats. The length of time the water persists and the average annual salinity are important variables in modeling habitat switching (cover type change). Marsh type habitat switching affects fish, shellfish, and wildlife inhabitants, and can affect the regional ecosystem and economy. There are numerous restoration and revitalization projects underway in the coastal region, and their effects on the entire ecosystem need to be understood. For these reasons, monitoring persistent saltwater intrusion and inundation is important. For this study, persistent flooding in Louisiana coastal marshes was mapped using MODIS (Moderate Resolution Imaging Spectroradiometer) time series of a Normalized Difference Water Index (NDWI). The time series data were derived for 2000 through 2009, including flooding due to Hurricane Rita in 2005 and Hurricane Ike in 2008. Using the NDWI, duration and extent of flooding can be inferred. The Time Series Product Tool (TSPT), developed at NASA SSC, is a suite of software developed in MATLAB® that enables improved-quality time series images to be computed using advanced temporal processing techniques. This software has been used to compute time series for monitoring temporal changes in environmental phenomena, (e.g. NDVI times series from MODIS), and was modified and used to compute the NDWI indices and also the Normalized Difference Soil Index (NDSI). Coastwide Reference Monitoring System (CRMS) water levels from various hydrologic monitoring stations and aerial photography were used to optimize thresholds for MODIS-derived time series of NDWI and to validate resulting flood maps. In most of the profiles produced for post-hurricane assessment, the increase in the NDWI index (from storm surge) is accompanied by a decrease in the vegetation index (NDVI) and then a period of declining water. The NDSI index represents non-green or dead vegetation and increases after the hurricane's destruction of the marsh vegetation. Behavior of these indices over time is indicative of which areas remain flooded, which areas recover to their former levels of vegetative vigor, and which areas are stressed or in transition. Tracking these indices over time shows the recovery rate of vegetation and the relative behavior to inundation persistence. The results from this study demonstrated that identification of persistent marsh flooding, utilizing the tools developed in this study, provided an approximate 70-80 percent accuracy rate when compared to the actual days flooded at the CRMS stations.
A coupled DEM-CFD method for impulse wave modelling
NASA Astrophysics Data System (ADS)
Zhao, Tao; Utili, Stefano; Crosta, GiovanBattista
2015-04-01
Rockslides can be characterized by a rapid evolution, up to a possible transition into a rock avalanche, which can be associated with an almost instantaneous collapse and spreading. Different examples are available in the literature, but the Vajont rockslide is quite unique for its morphological and geological characteristics, as well as for the type of evolution and the availability of long term monitoring data. This study advocates the use of a DEM-CFD framework for the modelling of the generation of hydrodynamic waves due to the impact of a rapid moving rockslide or rock-debris avalanche. 3D DEM analyses in plane strain by a coupled DEM-CFD code were performed to simulate the rockslide from its onset to the impact with still water and the subsequent wave generation (Zhao et al., 2014). The physical response predicted is in broad agreement with the available observations. The numerical results are compared to those published in the literature and especially to Crosta et al. (2014). According to our results, the maximum computed run up amounts to ca. 120 m and 170 m for the eastern and western lobe cross sections, respectively. These values are reasonably similar to those recorded during the event (i.e. ca. 130 m and 190 m respectively). In these simulations, the slope mass is considered permeable, such that the toe region of the slope can move submerged in the reservoir and the impulse water wave can also flow back into the slope mass. However, the upscaling of the grains size in the DEM model leads to an unrealistically high hydraulic conductivity of the model, such that only a small amount of water is splashed onto the northern bank of the Vajont valley. The use of high fluid viscosity and coarse grain model has shown the possibility to model more realistically both the slope and wave motions. However, more detailed slope and fluid properties, and the need for computational efficiency should be considered in future research work. This aspect has also been investigated by Crosta et al. (2014) via 2D and 3D FEM ALE modelling without considering the water seepage in the slope mass has been used. Their results can be a good way to estimate the slope and wave motion for fast sliding conditions. The 3D modelling can also clarify the lateral motion of water and estimate the potential risk of water overtopping the dam crest. The DEM and FEM ALE modelling can be used together to analyse fast moving rockslides (i.e. flowslides, rockslides, rock and debris avalanches) both in dry conditions and for their interaction with water basins. References Zhao, T., Utili, S., Crosta, G.B. Rockslide and impulse wave modelling in the Vajont reservoir by DEM-CFD analyses. Rock Mechanics and rock Engineering, under review. Crosta, G.B., Imposimato, S. & Roddeman, D. 2014. Landslide spreading, impulse waves and modelling of the Vajont rockslide. Rock Mechanics and Rock Engineering, under review.
Recent damaging earthquakes in Japan, 2003-2008
Kayen, Robert E
2008-01-01
During the last six years, from 2003-2008, Japan has been struck by three significant and damaging earthquakes: The most recent M6.6 Niigata Chuetsu Oki earthquake of July 16, 2007 off the coast of Kashiwazaki City, Japan; The M6.6 Niigata Chuetsu earthquake of October 23, 2004, located in Niigata Prefecture in the central Uonuma Hills; and the M8.0 Tokachi Oki Earthquake of September 26, 2003 effecting southeastern Hokkaido Prefecture. These earthquakes stand out among many in a very active period of seismicity in Japan. Within the upper 100 km of the crust during this period, Japan experienced 472 earthquakes of magnitude 6, or greater. Both Niigata events affected the south-central region of Tohoku Japan, and the Tokachi-Oki earthquake affected a broad region of the continental shelf and slope southeast of the Island of Hokkaido. This report is synthesized from the work of scores of Japanese and US researchers who led and participated in post-earthquake reconnaissance of these earthquakes: their noteworthy and valuable contributions are listed in an extended acknowledgements section at the end of the paper. During the Niigata Chuetsu Oki event of 2007, damage to the Kashiwazaki-Kariwa nuclear power plant, structures, infrastructure, and ground were primarily the product of two factors: (1) high intensity motions from this moderate-sized shallow event, and (2) soft, poor performing, or liquefiable soils in the coastal region of southwestern Niigata Prefecture. Structural and geotechnical damage along the slopes of dunes was ubiquitous in the Kashiwazaki-Kariwa region. The 2004 Niigata Chuetsu Earthquake was the most significant to affect Japan since the 1995 Kobe earthquake. Forty people were killed, almost 3,000 were injured, and many hundreds of landslides destroyed entire upland villages. Landslides were of all types; some dammed streams, temporarily creating lakes threatening to overtop their new embankments and cause flash floods and mudslides. The numerous landslides resulted, in part, from heavy rain associated with Typhoon Tokage. The earthquake forced more than 100,000 people into temporary shelters, and as many as 10,000 displaced from their upland homes for several years. Total damages was estimated by Japanese authorities at US$40 billion, making this the second most costly disaster in history, after the 1995 Kobe earth-quake. The 2003 Tokachi-Oki earthquake was the third event of magnitude 8.0+ to strike the southeastern portion of Hokkaido in the last 50 years. The event produced tsunami run-ups along the shoreline of southern Hokkaido that reached maximum heights of 4 meters. Accelerations recorded by seismic networks of Hokkaido indicated a high intensity motion region from Hiroo area to Kushiro City, with a PGA values in the range of 0.35 to 0.6g. Despite high acceleration levels, the observed ground failure, liquefaction, structural, port, and lifeline damages were remarkably light.
SLR-induced changes on storm flooding in coastal areas: the role of accommodation space
NASA Astrophysics Data System (ADS)
Jiménez, Jose A.; Dockx, Stijn; Monbaliu, Jaak
2015-04-01
Most of existing predictions of climate-induce changes in coastal storminess in the Mediterranean indicate the absence of any significant increasing trend in neither wave height nor surge. However, this does not mean that magnitude and/or frequency of storm-induced coastal hazards will not be affected by climate change. Thus, sea level rise will induce a series of long-term changes in coastal areas that although not directly affecting storminess will interact with storm-induced processes and, thus, changing coastal storm risks. A typical approach to account SLR-induced effects on coastal inundation by storms is to modify present water level extreme climate by adding expected MWL increase. This implies to consider the coast as a static and passive system to SLR maintaining its configuration from actual to projected (rised) sea level and, as a result of this, the frequency of flood events should increase and, the magnitude of flooding associated to a probability of occurrence will also increase. This will only be realistic for really passive or rigid coasts. However, sandy coastlines will response to SLR and, thus, this approach should undervalue coastal resilience. Within this context, the main aim of this work is to propose a method to assess the effects of SLR on the magnitude of storm-induced coastal flooding on sandy coastlines taking into account their capacity of response. It combines the use of a inundation model (LISFLOOD-FP) for delineating the flood-prone area for given storm conditions and, a coastal module to account for SLR-induced changes in the coastal fringe. The method assumes an equilibrium-type coastal response to SLR which, ideally, implies that the beach profile will be reconstructed under the new higher water level, in such a way that the relative beach configuration will be the same. However, this should only be possible provided there is enough accommodation space in the hinterland. In most of developed coasts, the existence of human built infrastructures conditions and limits the availability of accommodation space and, thus, controls the magnitude of the coastal response and final configuration under SLR. This final configuration will determine potential changes in water level and overtopping regimes under the SLR scenario. Thus, potential SLR effects on storm-inundation will range between no changes for a "complete-equilibrium" response to worst case scenario which corresponds to a non-response (static) situation. The method has been tested in a low-lying coast in Catalonia (Spain, NW Mediterranean) where accommodation space varies along the coastline for different SLR scenarios. Obtained results show that, in spite of any variation in storminess, storm-induced flood risk significantly increase in time due to CC. Moreover, the observed variations in accommodation space along the coast significantly affect the observed increase in flood extension and, in consequence, it becomes one an essential aspect to be controlled for efficient management of future inundation risks.
A New Approach to Monitoring Coastal Marshes for Persistent Flooding
NASA Technical Reports Server (NTRS)
Kalcic, M. T.; Undersood, Lauren W.; Fletcher, Rose
2012-01-01
Many areas in coastal Louisiana are below sea level and protected from flooding by a system of natural and man-made levees. Flooding is common when the levees are overtopped by storm surge or rising rivers. Many levees in this region are further stressed by erosion and subsidence. The floodwaters can become constricted by levees and trapped, causing prolonged inundation. Vegetative communities in coastal regions, from fresh swamp forest to saline marsh, can be negatively affected by inundation and changes in salinity. As saltwater persists, it can have a toxic effect upon marsh vegetation causing die off and conversion to open water types, destroying valuable species habitats. The length of time the water persists and the average annual salinity are important variables in modeling habitat switching (cover type change). Marsh type habitat switching affects fish, shellfish, and wildlife inhabitants, and can affect the regional ecosystem and economy. There are numerous restoration and revitalization projects underway in the coastal region, and their effects on the entire ecosystem need to be understood. For these reasons, monitoring persistent saltwater intrusion and inundation is important. For this study, persistent flooding in Louisiana coastal marshes was mapped using MODIS (Moderate Resolution Imaging Spectroradiometer) time series of a Normalized Difference Water Index (NDWI). The time series data were derived for 2000 through 2009, including flooding due to Hurricane Rita in 2005 and Hurricane Ike in 2008. Using the NDWI, duration and extent of flooding can be inferred. The Time Series Product Tool (TSPT), developed at NASA SSC, is a suite of software developed in MATLAB(R) that enables improved-quality time series images to be computed using advanced temporal processing techniques. This software has been used to compute time series for monitoring temporal changes in environmental phenomena, (e.g. NDVI times series from MODIS), and was modified and used to compute the NDWI indices and also the Normalized Difference Soil Index (NDSI). Coastwide Reference Monitoring System (CRMS) water levels from various hydrologic monitoring stations and aerial photography were used to optimize thresholds for MODIS-derived time series of NDWI and to validate resulting flood maps. In most of the profiles produced for post-hurricane assessment, the increase in the NDWI index (from storm surge) is accompanied by a decrease in the vegetation index (NDVI) and then a period of declining water. The NDSI index represents non-green or dead vegetation and increases after the hurricane s destruction of the marsh vegetation. Behavior of these indices over time is indicative of which areas remain flooded, which areas recover to their former levels of vegetative vigor, and which areas are stressed or in transition. Tracking these indices over time shows the recovery rate of vegetation and the relative behavior to inundation persistence. The results from this study demonstrated that identification of persistent marsh flooding, utilizing the tools developed in this study, provided an approximate 70-80 percent accuracy rate when compared to the actual days flooded at the CRMS stations.
NASA Astrophysics Data System (ADS)
Nittrouer, Jeffrey
2016-04-01
Owing to their extraordinary natural resources and ecosystem services, deltaic coastlines host hundreds of millions of people worldwide. Societal sustainability on these coastal landscapes is far from certain, however, due to anthropogenic influences including sediment-supply reduction, accelerated subsidence from sub-surface fluid extraction, and leveeing of rivers. The crucial resource in building stable deltaic coastlines is sediment, and the key control on sediment delivery, whether natural or engineered, is by way river channel diversions. Two case studies, based on previous and ongoing research efforts, are presented here to describe the effects of engineered diversions for the removal of river water and associated sediment: the Mississippi River (U.S.A) and the Yellow River (China). Comparatively speaking, these two systems are end-members: Mississippi River water discharge is five times greater than the Yellow River, and yet historically, the Yellow River sediment discharges five times more sediment than the Mississippi system. As such, diversions for the two systems have contrasting goals. During flood events, the Mississippi water stage threatens major metropolitan regions with levee overtopping; spillways are therefore utilized to reduce water flux through the main channel. For the Yellow River, extremely high sediment loads result in significant sedimentation within the main channel, and so there is a concerted effort to divert and shorten the main channel, in order to enhance the water surface slope and increase sediment transport capacity. Interestingly, the net effect of these two projects has been to deposit a significant amount of sediment into the respective receiving basins, which in turn has led to the development of subaerial land. In essence, this represents two compelling case studies documenting how managed (engineered) land building practices can be implemented for other large fluvial-deltaic systems. Observational data collected from field studies of both the Mississippi and Yellow rivers have been used to inform and validate numerical modeling efforts that seek to replicate the morphodynamics of the two diversions. The aim is to evaluate best practices for building deltaic landscape. Based on these research efforts, there are key similarities found for the delta systems: 1) coarse (sandy) sediment is the primary contributor to subaerial delta development, despite the abundance of mud for both rivers; 2) the influx of freshwater into estuarine regions of deltas has tremendous impact on vegetation development, and therefore the cohesion of the deltaic sediment deposit; and 3) it is feasible to produce efficient diversions that maximize sediment delivery and still provide for continued use of the riverine resource (for example, navigation of the channel by vessels). These findings are critical when considering future plans that seek sustainable management practices of other large, anthropic fluvial deltaic systems.
Adapting NEMO for use as the UK operational storm surge forecasting model
NASA Astrophysics Data System (ADS)
Furner, Rachel; Williams, Jane; Horsburgh, Kevin; Saulter, Andrew
2016-04-01
The United Kingdom is an area vulnerable to damage due to storm surges, particularly the East Coast which suffered losses estimated at over £1 billion during the North Sea surge event of the 5th and 6th December 2013. Accurate forecasting of storm surge events for this region is crucial to enable government agencies to assess the risk of overtopping of coastal defences so they can respond appropriately, minimising risk to life and infrastructure. There has been an operational storm surge forecast service for this region since 1978, using a numerical model developed by the National Oceanography Centre (NOC) and run at the UK Met Office. This is also implemented as part of an ensemble prediction system, using perturbed atmospheric forcing to produce an ensemble surge forecast. In order to ensure efficient use of future supercomputer developments and to create synergy with existing operational coastal ocean models the Met Office and NOC have begun a joint project transitioning the storm surge forecast system from the current CS3X code base to a configuration based on the Nucleus for European Modelling of the Ocean (NEMO). This work involves both adapting NEMO to add functionality, such as allowing the drying out of ocean cells and changes allowing NEMO to run efficiently as a two-dimensional, barotropic model. As the ensemble surge forecast system is run with 12 members 4 times a day computational efficiency is of high importance. Upon completion this project will enable interesting scientific comparisons to be made between a NEMO based surge model and the full three-dimensional baroclinic NEMO based models currently run within the Met Office, facilitating assessment of the impact of baroclinic processes, and vertical resolution on sea surface height forecasts. Moving to a NEMO code base will also allow many future developments to be more easily used within the storm surge model due to the wide range of options which currently exist within NEMO or are planned for future NEMO releases, such as data assimilation, and surge-wave coupling. Assessment of tidal performance of the NEMO-surge configuration and comparison to the existing operational CS3X model has been carried out. Evaluation of the models focus on performance relative to the UK Class A tide gauge network, a dataset which was established following the devastating flood of 1953 and which is managed by the British Oceanographic Data Service (BODC) based at NOC. Trials of the NEMO model in tide-only mode have illustrated the importance of having a well specified bathymetry and, for the 7km scaled model, a secondary sensitivity to bed friction coefficient and the specification of the coastline. Preliminary results will also be presented from model runs with atmospheric (wind stress and pressure at mean sea-level) forcing.
The influence of underlying topography on lava channel networks and flow behavior (Invited)
NASA Astrophysics Data System (ADS)
Dietterich, H. R.; Cashman, K. V.; Rust, A.
2013-12-01
New high resolution mapping of historical lava flows in Hawai';i reveals complex topographically controlled channel networks. Network morphologies range from distributary systems dominated by branching around local obstacles, to tributary systems constricted by topographic confinement. Because channel networks govern the distribution of lava within the flow, they can dramatically alter the effective volumetric flux, which affects both flow length and advance rate. The influence of flow bifurcations is evidenced by (1) channelized flows from Pu';u ';O';o episodes 1-20 at Kilauea Volcano, where flow front velocities decreased by approximately half each time a flow split, and (2) the length of confined flows, such as the Mauna Loa 1859 flow, which traveled twice as far as the distributary Mauna Loa 1984 flow, despite similar effusion rates and durations. To study the underlying controls on flow bifurcations, we have undertaken a series of analogue experiments with golden syrup (a Newtonian fluid) to better understand the physics of obstacle interaction and its influence on flow behavior and morphology. Controlling the effusion rate and surface slope, we extrude flows onto a surface with a cylindrical or V-shaped obstacle of variable angle. When the flow is sufficiently fast, a stationary wave forms upslope of the obstacle; if the stationary wave is sufficiently high, the flow can overtop, rather than split around, the obstacle. The stationary wave height increases with flow velocity and with the effective obstacle width. Evidence for stationary waves in Hawaiian lava flows comes from both photographs of active flows and waveforms frozen into solidified flows. We have also performed a preliminary set of similar experiments with molten basalt to identify the effect of cooling and investigate flow merging. In these experiments, a stationary wave develops upslope of the obstacle, which allows the surface to cool and thicken. After splitting, the syrup experiments show minimal impact of the split on flow advance, except in cases where the flow is very thin, and surface tension controls the flow behavior. In contrast, the experiments with molten basalt slow markedly, as measured by both flow front and surface velocities. This difference demonstrates the effect of cooling and crust formation on flowing lava. Crust formation also controls the ability of split flows to merge below an obstacle, such that flows can converge only at high flow rates, which limits time for crust formation, and at narrow obstacle angles, which limits the lateral spreading required for convergence. Our experiments qualitatively support theoretical descriptions of crustal controls on flow spreading and levee development, but our poor knowledge of the appropriate parameter values, particularly that of the strength of the viscoelastic crust, prevents a quantitative comparison. These experiments, and our observations from natural systems, have significant implications for predicting lava flow behavior and inform efforts to mitigate flow hazards with diversion barriers.
McEachern, Kathryn; Chess, Katie; Flagg, Karen; Niessen, Ken; Owen,; Thompson,
2010-01-01
Galium buxifolium E. Greene [Rubiaceae] (sea-cliff bedstraw) is a small shrub restricted to San Miguel and Santa Cruz Islands, in the California Channel Islands. Almost all of the 26 known populations grow on vertical north-facing sea cliffs in native scrub, sandwiched between the sea below and non-native annual grasslands on the terraces above. A notable exception is a popula?tion at Pelican Bay on Santa Cruz Island, growing on the cliff and on thin terrace soils above the cliff in a stand of coastal bluff scrub that is recovering from more than a century of sheep grazing (Figure 1). Ironically, this stand is near the location of the historic Eaton Resort, a charismatic inn frequented by Hollywood glitterati in the early 1900s. Several landscape ornamentals planted there persist today in the area of the Galium population. Italian stone pine (Pinus pinaea) and eucalyptus (Eucalyptus spp.) tower over the site while the invasive groundcover Vinca major L. [Apocynaceae] (greater periwinkle) forms dense mats at the cliff edge that are spreading into the developing native plant stand. Wherever the Galium is found it is intermixed with other native scrub plants in dense communities on moist ocean bluffs. Historic notes and herbarium collections indicate that it may have been more widespread on nearshore terraces adjacent to sea-cliff populations before conversion to grassland. Since Pelican Bay is the only site that we know of where Galium is spreading onto the nearby terrace, we wanted to know whether the Vinca posed a roadblock to upslope population expansion. In 2005 we mapped Vinca and Galium at the site. We also measured Galium individuals to see where the smaller, younger plants were to better understand where the population is expanding. We observed that 1) both the Galium and the Vinca appear to be spreading from the cliff face upslope onto a series of rock outcrops, stone walls and benches, 2) the native scrub community is recovering at the site and 3) the Vinca appears to be moving into the native scrub where it overtops small plants, including those Galium in the smallest size classes. This observed pattern of Vinca displacement of native vegetation has been noted in other places, where it is treated as an invasive weed. We concluded that Vinca may pose a threat to the expansion of both the native scrub and the Galium population that it supports. Therefore, we worked with the US Fish and Wildlife Service and others to develop a research project investigating 1) best techniques for killing Vinca within the boundaries of an endangered plant population and 2) demographic response of Galium to the treatment. Our intent is to push Vinca back to the vertical cliff face to give the natives a chance to establish a vigorous stand. Our conservation goal is to encourage natural establishment of new Galium plants on the terrace along with expansion of the native coastal bluff scrub and Galium population. Our immediate treatment objective is to reduce live Vinca cover by 90 % on the accessible upslope portions of the habitat. Our recovery objective is no net loss of Galium plants 2006-2016.
NASA Astrophysics Data System (ADS)
Passeri, D.; Hagen, S. C.; Medeiros, S. C.
2013-12-01
Sea level rise (SLR) threatens coastal environments with loss of land, inundation of coastal wetlands, and increased flooding during extreme storm events. Research has shown that SLR is a major factor in the long-term, gradual retreat of shorelines (Fitzgerald et al., 2008). Along sandy shorelines, retreat has a more dynamic effect than just inundation due to rising water levels, including the physical process of erosion in which sand is removed from the shoreface and deposited offshore. This has the potential to affect ecological habitats as well as coastal communities. Although SLR induces seaward retreat of shorelines, many shorelines especially within the vicinity of inlets may experience accretion due to sediment trapping or beach replenishment (Aubrey and Giese, 1993, Browder and R.G., 1999). This study examines the influence of including projected shoreline changes under future sea states into hydrodynamic modeling within the Northern Gulf of Mexico (NGOM). The NGOM coastline is an economically and ecologically significant area, comprised of various bays, barrier islands and mainland beaches. Projected shorelines and nearshore morphology for the year 2050 are derived from the Coastal Vulnerability Index (CVI) shoreline change rates (Thieler and Hammer-Klose, 1999) and used in conjunction with the 'Bruun Rule effect'(Bruun, 1962). A large scale hydrodynamic model forced by astronomic tides and hurricane winds and pressures is used to simulate present conditions, a high projection of the 2050 sea state (18 in of SLR in accordance with Parris et al. (2012)) and the 2050 high sea state with 2050 shorelines to test the sensitivity of the system to the projected shoreline changes. Results show that shoreline changes coupled with sea level rise increases tidal inundation along shorelines, amplifies overtopping of barrier islands during storm surge events, and heightens inland storm surge inundation. It is critical to include estimates of shoreline and barrier island morphology when considering the hydrodynamics of extreme SLR projections. Aubrey, D. J. and G. S. Giese (1993). "Formation and Evolution of Multiple Tidal Inlets." Coastal Estuarine Stud. 44: 1-61. Browder, A. E. and D. R.G. (1999). "Pensacola Pass, FL Inlet Management Study". Coastal & Oceanographic Engineering Department, University of Florida, Prepared for Florida Department of Environmental Proection Bureau of Beaches and Coastal Systems. Bruun, P. (1962). "Sea-level rise as a cause of shore erosion." Proceedings of the American Society of Civil Engineers, Journal of the Waterways and Harbors Division 88: 117-130. Fitzgerald, D. M., M. S. Fenster, B. A. Argow and I. V. Buynevich (2008). "Coastal Impacts Due to Sea Level Rise." Annual Review Earth Planet Science 36: 601-647. Parris, A., P. Bromirski, V. Burkett, D. Cayan, M. Culver, J. Hall, R. Horton, K. Knuuti, R. Moss, J. Obeysekera, A. Sallenger and J. Weiss (2012). "Global Sea Level Rise Scenarios for the United States National Climate Assessment". NOAA Tech Memo OAR CPO-1: 37. Thieler, E. R. and E. S. Hammer-Klose (1999). "National Assessment of Coastal Vulnerability to Sea Level rise: Preliminary Results for the U.S. Atlantic Coast". Woods Hole, Massachusetts, US Geological Survey.
Johnson, Kirk R.; Miller, Ian M.; Pigati, Jeffery S.
2014-01-01
Studies of terrestrial biotic and environmental dynamics of the last interglacial period, Marine Oxygen Isotope Stage (MIS) 5, provide insight into the effects of long-term climate change on Pleistocene ecosystems. In North America, however, there are relatively few fossil sites that definitively date to MIS 5. Even fewer contain multiple ecosystem components (vertebrates, invertebrates, plants) that have been studied in detail, and none are located at high elevation. Thus, our view of North American ecosystems during MIS 5 is, at best, an incomplete composite view, and alpine ecosystems are entirely undocumented. The Ziegler Reservoir fossil site allows us to begin filling these gaps. Discovered on October 14, 2010 by a construction crew while enlarging a small reservoir near Snowmass Village, Colorado (USA), the site is situated high in the Rocky Mountains at an elevation of ~ 2705 m. Initial excavations exposed a series of stacked fossil ecosystems, including abundant faunal and floral components. Subsequent work revealed an exceptionally diverse biota composed of nearly 6000 large bones of late Pleistocene megafauna, including mastodons, mammoths, ground sloths, horses, camels, deer, bison, black bear, coyotes, and big horn sheep. This collection is complemented by more than 200 bones from at least 40 species of small animals including otters, muskrats, minks, rabbits, beavers, frogs, lizards, snakes, fish, and birds, and more than 20,000 salamander bones. Geomorphic evidence and multiple dating techniques show that the small, ridge-top basin containing the site was formed by a lateral lobe of a valley glacier that filled, and ultimately overtopped, the Snowmass Creek drainage during the Bull Lake glaciation (MIS 6). When the glacier receded, a lake that occupied the basin began to fill slowly with what is hypothesized to be eolian sediment and occasional input from slope failures of the impounding moraine. As sedimentation continued, the lake transformed first into a shallow pond, then a marsh, and later an alpine meadow. In all, the Ziegler Reservoir sedimentary record spans the time encompassed by the end of MIS 6, all of MIS 5 and MIS 4, and the earliest part of MIS 3. MIS 5e, which is considered to be the peak warmth of the last interglacial period, is especially well represented. Preservation of organic material at the Ziegler Reservoir fossil site is exceptional. Even after more than 100,000 years of burial, sedge and willow leaves were still green, mollusks and gastropods showed color, beetle parts remained iridescent, fossil conifer cones were intact, and an entire beach of 20-meter-long driftwood logs was found intact. The exquisite preservation allowed for detailed analysis of pollen, plant macrofossils, conifer cones, and fossil wood, as well as insects, chironomids, mollusks, ostracodes, and other invertebrates — all in addition to the spectacular faunal remains. This special volume of Quaternary Research represents a comprehensive scientific report of “The Snowmastodon Project,” as the investigations at the Ziegler Reservoir fossil site came to be known. Summarizing the work of scientists from more than 20 institutions, the volume details the environments in which the animals lived, provides insight into how they died, and forms the foundation of our understanding of alpine ecosystem dynamics during the last interglacial period in the Rocky Mountains.
NASA Astrophysics Data System (ADS)
Andreeva, Nataliya; Eftimova, Petya; Valchev, Nikolay; Prodanov, Bogdan
2017-04-01
The study presents evaluation and comparative analysis of storm induced flooding impacts on different coastal receptors at a scale of Varna region using INtegrated DisRuption Assessment (INDRA) model. The model was developed within the FP7 RISC-KIT project, as a part of Coastal Risk Assessment Framework (CRAF) consisting of two phases. CRAF Phase 1 is a screening process that evaluates coastal risk at a regional scale by means of coastal indices approach, which helps to identify potentially vulnerable coastal sectors: hot spots (HS). CRAF Phase 2 has the objective to assess and rank identified hotspots by detailed risk analysis done by jointly performing a hazard assessment and an impact evaluation on different categories (population, businesses, ecosystems, transport and utilities) using INDRA model at a regional level. Basically, the model assess the shock of events by estimating the impact on directly exposed to flooding hazard receptors of different vulnerability, as well as the potential ripple effects during an event in order to assess the "indirect" impacts, which occur outside the hazard area and/or continue after the event for all considered categories. The potential impacts are expressed in terms of uniform "Impact Indicators", which independently score the indirect impacts of these categories assessing disruption and recovery of the receptors. The ultimate hotspot ranking is obtained through the use of a Multi Criteria analysis (MCA) incorporated in the model, considering preferences of stakeholders. The case study area - Varna regional coast - is located on the western Black Sea, Bulgaria. The coastline, with a length of about 70 km, stretches from cape Ekrene to cape St. Atanas and includes Varna Bay. After application of CRAF Phase 1 three hotspots were selected for further analysis: Kabakum beach (HS1), Varna Central beach plus Port wall (HS2) and Artificial Island (HS3). For first two hotspots beaches and associated infrastructure are the assets that attract holiday-makers and tourists in summer season. For HS3 the exposed area is occupied by storage premises for industrial goods and oil/fuel tanks. Flooding hazard was assessed through coupled use of XBeach 1D and LISFLOOD 2D inundation models at the selected hotspots. The "response" approach was adopted as 75 extreme storm events were simulated to obtain storm maxima series of overtopping discharges, flood depth, depth-velocity and berm retreat. The selected return periods within the extreme value analysis were 20, 50 and 100 years. For impact evaluation by INDRA model the categories "Population" and "Business" were considered. Impacts on Population were addressed by 3 impact indicators: "Risk to Life", "Household Displacement Time" and "Household Financial Recovery", while for Business category only by "Business Financial Recovery". Hotspots ranking was done using MCA by weighting of the evaluated indicators: focused on Risk to Life (F1) and on Business Financial Recovery (F2). MCA scoring focused on Household displacement/recovery was not evaluated because modelling results revealed quite a low number of flooded household receptors. Results show that for both F1 and F2 and for all considered return periods HS2 has the highest scores, which makes it a final hotspot.
Case study of small harbor excitation under storm and tsunami conditions
NASA Astrophysics Data System (ADS)
Synolakis, Costas; Maravelakis, Nikos; Kalligeris, Nikos; Skanavis, Vassilios; Kanoglu, Utku; Yalciner, Ahmet; Lynett, Pat
2016-04-01
Simultaneous nearshore and interior-to-ports wave and current measurements for small ports are not common, and few, if any, benchmarking cases at sufficient resolution exist to help validate numerical model of intermediate waves, or even long waves. The wave conditions inside the old Venetian harbor of Chania, Greece and offshore were measured and studied from 2012 to 2015. The construction of this harbor began in the 14th century, and since then, its layout has been modified to adapt to different social and to economic conditions. It is divided into a western and an eastern basin. The eastern basin is used by recreational vessels and fishing boats throughout the year. The western basin has an exposed entrance to the north, and it is essentially functional half of the year, because of the severe overtopping and flooding that occur during the northern winter storms. Our work is motivated by the necessity to protect the monument from severe winter storm conditions and allow safe mooring and all other recreational activities that take place in the exposed western basin. Two earlier studies had proposed the construction of a low crested breakwater near the harbor entrance. The first design has been partially constructed, while the second never materialized. The main disadvantage of both studies was the lack of any wave field measurements. At the same time, second order or complimentary phenomena such as harbor resonance had not been considered. To address the lack of field data, the offshore wave climate has been monitored since October 2012 using an AWAC 600kHz instrument, deployed at 23m depth. The response of the western and eastern basins of the harbor was measured with a TWR-2050 (deployed at 5.5m depth) and an RBRDuet T.D./wave (deployed at 2m depth) pressure gauges respectively. Significant wave heights ranging up to 5.8 m with significant periods of up to 10 sec were measured. The harbor pressure gauges are now being re-deployed in other locations to collect enough information to infer the resonant modes of the basins excited during storm conditions. The deployment position of the pressure gauges is based on numerical modeling results. We have employed the fully nonlinear Boussinesq module of COULWAVE using a high resolution (2m cell size) relief model and an idealized TMA directional wave spectrum. The wave field and low frequency energy distribution in the basin are captured by both numerical modeling and field measurements. The field measurements agree well with the numerical modeling analysis, providing insight as to the causes of severe disturbance and useful information that should be considered for an effective solution to the protection of the harbor. Our measurements appear the first ever nearshore measurements of waves and currents for a 2+ year period duration in Greece. The work is also being used for validation tsunami inundation models for civil defense applications in Crete. * This work was supported by the project ASTARTE, Grant no 603839 7th FP (ENV.213.6.4.3) to the Technical University of Crete and to the Middle East Technical University.
NASA Astrophysics Data System (ADS)
Russell, Andrew; Perks, Matthew; Large, Andrew; Dunning, Stuart; Warburton, Jeff
2016-04-01
Between 0900 GMT on 4th December and 0900 GMT on 6th December 2015, Atlantic Storm Desmond produced over 260 mm of rainfall in Cumbria, northwest England, representing a new UK 48 hour rainfall maximum, and breaking previous records set in 2005 and 2009. The December 2015 event resulted in a number of rivers significantly exceeding their 2009 levels, over-topping recently-commissioned flood defences, destroying bridges and flooding thousands of homes. Our research aim is to identify factors controlling significant geomorphological and sedimentary response during Storm Desmond along the upland sediment cascade including: Rattling Beck (Glenridding), a high gradient upland stream draining the flanks of Helvellyn (950 m.a.o.d.), and a 25km extended reach of the lower gradient piedmont Derwent River corridor downstream of Bassenthwaite Lake. Rattling Beck descends steeply from the eastern slopes of the Helvellyn massif draining across an alluvial fan into Lake Ullswater. On 5th December 2015 the village of Glenridding was severely impacted by flooding which deposited boulder-sized sediment within the centre of the village, completely blocking the pre-existing stream course and causing avulsion of waning stage flows through riverside properties. A major new sediment lobe was deposited on the existing alluvial fan downstream of the village, grading to the temporarily raised lake water level. Although a number of hillslope failures occurred in the higher catchment, the majority of the sediment transported by Rattling Beck and impacting the village was acquired within a 2km reach upstream of Glenridding through erosion of older glacial and alluvial sediments. Lateral channel erosion was enhanced by inability of flood flows to rework highly resistant boulder bar lag deposits related to a previous mine tailings dam failure in 1927. The River Derwent corridor extends for 30km downstream of Bassenthwaite Lake to the Irish Sea at Workington and has a sinuous course ranging in maximum width from 500m to <150m in reaches narrowed by human modification. Despite the Derwent's relatively low gradient, significant erosional and depositional impacts occurred as a result of Storm Desmond, often reactivating discrete areas along the river corridor that saw major sediment shift and channel alteration in the 2009 floods. 2015 channel avulsions are associated with floodplain erosion principally initiated by the ploughing of, and scour around, large woody debris. Large gravel sheets (< 0.5 km2) characterised by distal slip faces up to 1m high were deposited at river corridor expansions downstream of actively eroding hillslopes and artificially narrowed reaches. Overall, major geomorphological response to Storm Desmond floods in Rattling Beck and the River Derwent is seen to be amplified by centennial-scale human modifications to river corridors and alluvial fans. River corridor engineering on the River Derwent and village construction on Rattling Beck's depositional fan at Glenridding moved both systems out of their natural equilibrium exacerbating the effects of storm-generated flooding on the Derwent (2009, 2015) and Rattling Beck (2015).
Klein, Roman; Armbruster, Wolfgang; Grotz, Martin; Höner, Bernd; Münzberg, Matthias; Grützner, Paul Alfred; Wölfl, Christoph Georg
2017-01-01
Objective: To correlate students' performance with their professional background and motivation to take part in Advanced Trauma Life Support (ATLS) courses. We base our analysis on the self-determination theory that differentiates intrinsic (ambition to perform by individual itself) from extrinsic motivation (incentive by external stimuli). Design: We present a non-blinded, monocentric, non-randomized descriptive study of 376 students taking part in an ATLS course at one course site in Germany. Part of a two-day ATLS course are two written tests; we correlate test scores with background information provided by the students in a questionnaire of 13 items (age, sex, adress, board certification, specialty, subspecialty, position, hospital level of care, hospital operator and hospital participation in trauma network, motivation, funding source, condition of funding). Setting: The students were recuited at the BG Trauma Center Ludwigshafen (Germany), a large 528-bed trauma center and one of 13 ATLS course sites in Germany. Participants: 449 ATLS course students taking part in ATLS courses at the above-mentioned course site from February 2009 to May 2010 were sent a questionnaire asking for their background. All 449 course students were eligible to participate. 376 (83.7%) questionnaires were returned, pre- and post-test results of all students aquired and included into our calculations. 312 (83%) were male and 64 (17%) female. The majority (59.3%) of recruited students came from trauma surgery, 21.8% from anesthesiology, 8% from general surgery, 4% from abdominal surgery, 0.5% from vascular or thoracic surgery each and 5.9% from other specialties. Results: Neither age, sex, subspecialty, hospital level of care, hospital operator, or hospital participation in trauma network played a role with respect to motivation or test results. The high degree of intrinsic motivation of consultants (92.3%) had no impact on their test results. Anesthesiologists were higher motivated (75.6% intrinsically motivated) in contrast to all surgical colleagues (63.6%), which showed significant differences in the pre- (89.8% vs. 85.3%, p=0.03) but not the post-test. Of all 13.6% students who were self-payers, 94.1% were intrinsically motivated; the 86.2% whose course fee was accounted for were less likely to be intrinsically motivated (63.9%). Sponsoring however did not have a negative impact on test results. Conditional funding (sponsored only on passing both tests) was detrimental to motivation: 0% of these individuals were intrinsically motivated and they scored significantly lower (82.5%) than all other students in the post-test (86.9%, p=0.002). Overall, intrinsically motivated students overtopped extrinsically motivated students in the post-test (88.0% vs. 83.4%, p<0.001). Conclusions: ATLS course participation is not compulsory for medical doctors in Germany. Intrinsic motivation to take part in these courses is a key prerequisite to increase performance, irrespective of the background of the students. Intrinsically motivated students are ready to invest into their education and vice versa. Conditional funding (course fee only sponsored on passing the course) evokes no intrinsic motivation at all and causes worse results.
Klein, Roman; Armbruster, Wolfgang; Grotz, Martin; Höner, Bernd; Münzberg, Matthias; Grützner, Paul Alfred; Wölfl, Christoph Georg
2017-01-01
Objective: To correlate students’ performance with their professional background and motivation to take part in Advanced Trauma Life Support (ATLS) courses. We base our analysis on the self-determination theory that differentiates intrinsic (ambition to perform by individual itself) from extrinsic motivation (incentive by external stimuli). Design: We present a non-blinded, monocentric, non-randomized descriptive study of 376 students taking part in an ATLS course at one course site in Germany. Part of a two-day ATLS course are two written tests; we correlate test scores with background information provided by the students in a questionnaire of 13 items (age, sex, adress, board certification, specialty, subspecialty, position, hospital level of care, hospital operator and hospital participation in trauma network, motivation, funding source, condition of funding). Setting: The students were recuited at the BG Trauma Center Ludwigshafen (Germany), a large 528-bed trauma center and one of 13 ATLS course sites in Germany. Participants: 449 ATLS course students taking part in ATLS courses at the above-mentioned course site from February 2009 to May 2010 were sent a questionnaire asking for their background. All 449 course students were eligible to participate. 376 (83.7%) questionnaires were returned, pre- and post-test results of all students aquired and included into our calculations. 312 (83%) were male and 64 (17%) female. The majority (59.3%) of recruited students came from trauma surgery, 21.8% from anesthesiology, 8% from general surgery, 4% from abdominal surgery, 0.5% from vascular or thoracic surgery each and 5.9% from other specialties. Results: Neither age, sex, subspecialty, hospital level of care, hospital operator, or hospital participation in trauma network played a role with respect to motivation or test results. The high degree of intrinsic motivation of consultants (92.3%) had no impact on their test results. Anesthesiologists were higher motivated (75.6% intrinsically motivated) in contrast to all surgical colleagues (63.6%), which showed significant differences in the pre- (89.8% vs. 85.3%, p=0.03) but not the post-test. Of all 13.6% students who were self-payers, 94.1% were intrinsically motivated; the 86.2% whose course fee was accounted for were less likely to be intrinsically motivated (63.9%). Sponsoring however did not have a negative impact on test results. Conditional funding (sponsored only on passing both tests) was detrimental to motivation: 0% of these individuals were intrinsically motivated and they scored significantly lower (82.5%) than all other students in the post-test (86.9%, p=0.002). Overall, intrinsically motivated students overtopped extrinsically motivated students in the post-test (88.0% vs. 83.4%, p<0.001). Conclusions: ATLS course participation is not compulsory for medical doctors in Germany. Intrinsic motivation to take part in these courses is a key prerequisite to increase performance, irrespective of the background of the students. Intrinsically motivated students are ready to invest into their education and vice versa. Conditional funding (course fee only sponsored on passing the course) evokes no intrinsic motivation at all and causes worse results. PMID:29214123
NASA Astrophysics Data System (ADS)
Huggel, C.; Kaeaeb, A.; Haeberli, W.; Mortara, G.; Chiarle, M.; Epifani, F.
2002-12-01
Starting in summer 2000, Belvedere Glacier, near Macugnaga, Italian Alps, developed an extraordinary change in flow, geometry and surface appearance. A surge-type flow acceleration started in the lower parts of the Monte-Rosa east face, leading to strong crevassing and deformation of Belvedere Glacier, accompanied by bulging of its orographic right margin. In September 2001, a small supraglacial lake developed on the glacier. High water pressure and accelerated movement lasted into winter 2001/2002. The ice, in places, started to override moraines from the Little Ice Age. In late spring and early summer 2002, the supraglacial lake grew at extraordinary rates reaching a maximum area of more than 150'000 m2 by end of June. The evolution of such a large supraglacial lake, a rather unique feature in the Alps, was probably enabled by changes in the subglacial drainage system in the course of the surge-like developments with high water pressure in the glacier. At the end of June, an enhanced growth of the lake level with a rise of about 1 m per day was observed such that the supraglacial lake became a urgent hazard problem for the community of Macugnaga. Emergency measures had to be taken by the Italian Civil Protection. The authors thereby acted as the official expert advisers. Temporal evacuations were ordered and a permanent monitoring and alarm system was installed. Pumps with a maximum output of 1 m3/s were brought to the lake. Bathymetric studies yielded a maximum lake depth of 55 m and a volume of 3.3 millions of cubic meters of water. Aerial photography of 1995, 1999, September 2001 and October 2001 was used to calculate ice flow velocities and changes in surface altitude. Compared to the period of 1995 to 1999, the flow accelerated by about five times in 2001 (max. speeds up to 200 m/yr). Surface uplift measured was about 10-15 m/yr. The results of the photogrammetric studies were used to evaluate different possible lake-outburst scenarios, in particular overtopping and failure of ice dam with catastrophic subglacial drainage. In consideration of the current bathymetric studies and ice thickness measurements from the 1980ies, it was assumed that the floatation equilibrium was possibly reached by end of June. In case of an ice dam, the maximum discharge of a related subglacial drainage was estimated at 200 m3/s, probably involving a large debris flow. Extension and nature of thermokarst processes of the lake/ice interface are currently studied by repeated bathymetric measurements and adaption of corresponding models. In July/August 2002, geodetic ice flow velocity measurements showed that the enhanced flow velocities have decreased probably indicat ing the end of the surge-like movement. In conclusion, the developments at Macugnaga are an excellent example illustrating the need for inte grated hazard assessments in consideration of complex process chains. The current situation requires studies on different aspects, such as rock instabilities, glacier dynamics and hydrology, geomorphody namics, and mitigation-construction planning.
Lessons on vulnerability from the 2011 Tohoku earthquake for Indonesia and the United States
NASA Astrophysics Data System (ADS)
Sugimoto, M.; Dengler, L.
2011-12-01
The 2011 Tohoku earthquake and tsunami shocked people relevant for tsunami disaster risk reduction all over the world because such people thought Tohoku has often attacked by tsunamis and has declared one of the most wellprepared areas for tsunami in the world. Each author has separately promoted tsunami education to community in Indonesia for 7 years after the 2004 Indian Ocean tsunami and California US for 19 years after the1992 M7.2 Cape Mendocino earthquake. In order to learn the lesson from the 2011 Tohoku earthquake and tsunami and feedback to Indonesia, US and International society, we examined some of the factors that contributed to impacts in Tohoku based on field reconnaissance and reports from other organizations. The biggest factors exacerbating losses were the underestimation M8 of the real tsunami size M9 in design of prevention structures and evacuation planning coupled with a perception of individuals that they were not at risk. Approximately 86 % of the tsunami victims were in areas outside the mapped tsunami hazard zone in Unosumai town, Iwate. At least 100 chosen tsunami evacuation buildings were either overtopped or structurally toppled by the tsunami. More than 200 people died in the first story gymnasium of elementary school beside the river and canal in areas outside the mapped tsunami hazard zone in Higashi-Matsushima city Miyagi. Around 80 students sacrificed in Okawa Elementary school in Ishinomaki city Miyagi. Additional factors affecting vulnerability included people who were in safe areas at the time of the earthquake, returning to hazard zones after feeling the earthquake to rescue relatives or possessions, and relying on cars for evacuation. Factors that enhanced resilience include the good performance of most structures to earthquake ground shaking and the performance of the tsunami early warning system in stopping trains and shutting down other critical systems. Although power was out in most of the affected region, some cell phones and automobile car radios worked in many areas and were able to provide some warning guidance. Individuals who were able to improvise and make changes in their evacuation plans and routes may have been more likely to survive. As for US, it has triggered a re-examination of how slip and secondary fault rupture may affect the size of the tsunami and engendered debate about how to treat uncertainty in model results while it has not changed the maximum magnitude estimate for an earthquake on the Cascadia subduction zone, it has triggered a re-examination of how slip and secondary fault rupture may affect the size of the tsunami and engendered debate about how to treat uncertainty in model results. It has also raised the priority of FEMA's catastrophic response planning efforts for a great Cascadia earthquake and has invigorated states and local coastal jurisdiction's planning, education, and outreach efforts. Indonesia has been on the way to prepare for tsunami from the Tohoku model after the 2004 Indian Ocean tsunami. I stopped the plan make signboards of numerical tsunami height in Padang Indonesia because such signboards were not effective in Tohoku in this time. We introduce new plans in this presentation.
NASA Astrophysics Data System (ADS)
van Heerden, I. L.
2006-12-01
Recent floods along the Atlantic and Gulf seaboards and elsewhere in the world before Katrina had demonstrated the complexity of public health impacts including trauma; fires; chemical, sewerage, and corpse contamination of air and water; and diseases. We realized that Louisiana's vulnerability was exacerbated because forty percent of the state is coastal zone in which 70% of the population resides. Ninety percent of this zone is near or below sea level and protected by man-made hurricane-protection levees. New Orleans ranked among the highest in the nation with respect to potential societal, mortality, and economic impacts. Recognizing that emergency responders had in the past been unprepared for the extent of the public health impacts of these complex flooding disasters, we created a multi-disciplinary, multi-campus research center to address these issues for New Orleans. The Louisiana Board of Regents, through its millennium Health Excellence Fund, awarded a 5-year contract to the Center in 2001. The research team combined the resources of natural scientists, social scientists, engineers, and the mental health and medical communities. We met annually with a Board of Advisors, made up of federal, state, local government, and non-governmental agency officials, first responders and emergency managers. Their advice was invaluable in acquiring various datasets and directing aspects of the various research efforts. Our center developed detailed models for assessment and amelioration of public health impacts due to hurricanes and major floods. Initial research had showed that a Category 3 storm would cause levee overtopping, and that most levee systems were unprotected from the impacts of storm-induced wave erosion. Sections of levees with distinct sags suggested the beginnings of foundation and subsidence problems. We recognized that a slow moving Cat 3 could flood up to the eaves of houses and would have residence times of weeks. The resultant mix of sewage, corpses and chemicals in these standing flood waters would set the stage for massive disease outbreaks and prolonged chemical exposure. Before Katrina, population evacuation behavior had been determined, computer models could be used to predict storm surge flooding, government databases and GIS technology allowed documentation of at-risk areas, probable chemical and sewerage release sites had been mapped, tropical disease experts and social scientists had determined possible public health impacts; that injured and displaced animal pets and wild animals would be a major problem had been identified; and, an interactive GIS database was available for utilization in all aspects of the assessment and remediation post landfall. The value of this project has been many-fold. First, before Katrina it had a positive impact on emergency preparedness in the state of Louisiana. Second, during the hurricane Katrina catastrophe the project offered a major service to the state as the various data sets and research outputs were extensively used throughout the flooding thus reducing deaths, disease, pain, and suffering. Third, the model of academia aiding in disaster science and management is being exported nationally and internationally. Finally, our research results are applicable to other complex disasters such as earthquakes, tornadoes, chemical spills or terrorism.
NASA Astrophysics Data System (ADS)
Emmer, Adam; Mergili, Martin; Juřicová, Anna; Cochachin, Alejo; Huggel, Christian
2016-04-01
Since the end of Little Ice Age, the Cordillera Blanca of Perú has experienced tens of lake outburst floods (LOFs), resulting in the loss of thousands of lives and significant material damages. Most commonly involving glacial lakes, such events are often directly or indirectly related to glacier retreat. Here we analyze an event on 8th February 2012 involving four lakes and affecting two valleys (Santa Cruz and Artizón) in the northern part of the Cordillera Blanca. Using the combination of field data, satellite images, digital elevation model (DEM) and GIS-based modelling approaches, the main objectives are: (i) to better understand complex multi-lake outburst flood and related foregoing and induced geomorphological processes; and (ii) to evaluate and discuss the suitability, potentials and limitations of the r.avaflow model for modelling such complex process chains. Analyzing field geomorphological evidence and remotely-sensed images, we reconstruct the event as follows: a landslide from the recently deglaciated left lateral moraine of Lake Artizón Alto (4 639 m a.s.l.), characterized by steep slopes and a height of more than 200 m produced a displacement wave which overtopped the bedrock dam of the lake. The resulting flood wave breached the dam of the downstream moraine-/landslide-dammed Lake Artizón Bajo (4 477 m a.s.l.), decreasing the lake level by 10 m and releasing 3 x 105 m3 of water. Significant amounts of material were eroded from the steeper parts of the Artizón Valley (mean slope >15°) and deposited further downstream in the flatter part of the Santa Cruz Valley (mean slope <2°; confluence of the two valleys at 3 985 m a.s.l.). The flood affected two debris cone-dammed lakes (Jatuncocha and Ichiccocha) in the Santa Cruz Valley. Some minor damages to the dam of Lake Jatuncocha were documented. Geomprohological evidence of the event was observed more than 20 km downstream from Lake Artizón Alto. The described multi-LOF event was employed as a particularly challenging test case for the currently developed, GIS-based two-phase dynamic mass flow model r.avaflow. Whilst the test results are very promising, lessons learned for r.avaflow model are the need for (i) an improved concept to determine the flow boundaries; and (ii) thorough parameter tests. High demands on the resolution and quality of the DEM are revealed. From our event and modelling analysis we conclude the following: mass movements in the headwaters of hydrologically connected lake and river systems may affect the catchment in complex and cascading ways. Flood and mass flow magnitudes can be both intensified or attenuated along the pathway. Geomorphological analysis and related modelling efforts may elucidate the related hazards as a basis to reduce the associated risks to downstream communities and infrastructures. Keywords: cascading processes, dam failure, glacial lake outburst flood (GLOF), high-mountain lakes, r.avaflow
NASA Astrophysics Data System (ADS)
Cea, Luis; Bladé, Ernest; Corestein, Georgina; Fraga, Ignacio; Espinal, Marc; Puertas, Jerónimo
2014-05-01
Transitory flows generated by dam failures have a great sediment transport capacity, which induces important morphological changes on the river topography. Several studies have been published regarding the coupling between the sediment transport and hydrodynamic equations in dam-break applications, in order to correctly model their mutual interaction. Most of these models solve the depth-averaged shallow water equations to compute the water depth and velocity. On the other hand, a wide variety of sediment transport formulations have been arbitrarily used to compute the topography evolution. These are based on semi-empirical equations which have been calibrated under stationary and uniform conditions very different from those achieved in dam-break flows. Soares-Frazao et al. (2012) proposed a Benchmark test consisting of a dam-break over a mobile bed, in which several teams of modellers participated using different numerical models, and concluded that the key issue which still needs to be investigated in morphological modelling of dam-break flows is the link between the solid transport and the hydrodynamic variables. This paper presents a comparative analysis of different sediment transport formulations applied to dam-break flows over mobile beds. All the formulations analysed are commonly used in morphological studies in rivers, and include the formulas of Meyer-Peter & Müller (1948), Wong-Parker (2003), Einstein-Brown (1950), van Rijn (1984), Engelund-Hansen (1967), Ackers-White (1973), Yang (1973), and a Meyer-Peter & Müller type formula but with ad-hoc coefficients. The relevance of corrections on the sediment flux direction and magnitude due to the bed slope and the non-equilibrium hypothesis is also analysed. All the formulations have been implemented in the numerical model Iber (Bladé et al. (2014)), which solves the depth-averaged shallow water equations coupled to the Exner equation to evaluate the bed evolution. Two different test cases have been studied. The first one is the benchmark case presented in Soares-Frazao et al. (2012), and consists in an instanteneous dam-break flow over a sand bed. The second one corresponds to the experimental studies performed at the Engineering Faculty of the UNAM (Fuentes-Mariles et al. (2010)) and consists in the erosion of a volcanic sand dike by an overtopping flow. In both cases experimental measurements of water depth and bed evolution are available to evaluate the performance of different sediment transport formulations. A sensitivity analysis to the physical properties of the bed material (grain density and size) is also presented for each formulation, in order to analyse to which degree the properties of the bed material need to be defined in the numerical model. References Bladé, E., Cea, L., Corestein, G., Escolano, E., Puertas, J., Vázquez-Cendón, M.E., Dolz, J., Coll, A. (2014). Iber: herramienta de simulación numérica del flujo en ríos. Revista Internacional de Métodos Numéricos para Cálculo y Diseño en Ingeniería, Vol.30(1), pp.1-10 Fuentes-Mariles, Ó. A., Cruz-Gerón, J. A., Rivera-Díaz, C., Luna-Cruz, F., and González-Prado, J. (2010). "Caracterización Experimental de Ruptura de Diques." XXIV Congreso Latinoamericano de Hidráulica Soares-Frazão et al. (2012). Dambreak flows over mobile beds: experiments and benchmark tests for numerical models. Journal of Hydraulic Research, Vol.50(4), pp.364-375
Wagner, Chad R.
2007-01-01
The use of one-dimensional hydraulic models currently is the standard method for estimating velocity fields through a bridge opening for scour computations and habitat assessment. Flood-flow contraction through bridge openings, however, is hydrodynamically two dimensional and often three dimensional. Although there is awareness of the utility of two-dimensional models to predict the complex hydraulic conditions at bridge structures, little guidance is available to indicate whether a one- or two-dimensional model will accurately estimate the hydraulic conditions at a bridge site. The U.S. Geological Survey, in cooperation with the North Carolina Department of Transportation, initiated a study in 2004 to compare one- and two-dimensional model results with field measurements at complex riverine and tidal bridges in North Carolina to evaluate the ability of each model to represent field conditions. The field data consisted of discharge and depth-averaged velocity profiles measured with an acoustic Doppler current profiler and surveyed water-surface profiles for two high-flow conditions. For the initial study site (U.S. Highway 13 over the Tar River at Greenville, North Carolina), the water-surface elevations and velocity distributions simulated by the one- and two-dimensional models showed appreciable disparity in the highly sinuous reach upstream from the U.S. Highway 13 bridge. Based on the available data from U.S. Geological Survey streamgaging stations and acoustic Doppler current profiler velocity data, the two-dimensional model more accurately simulated the water-surface elevations and the velocity distributions in the study reach, and contracted-flow magnitudes and direction through the bridge opening. To further compare the results of the one- and two-dimensional models, estimated hydraulic parameters (flow depths, velocities, attack angles, blocked flow width) for measured high-flow conditions were used to predict scour depths at the U.S. Highway 13 bridge by using established methods. Comparisons of pier-scour estimates from both models indicated that the scour estimates from the two-dimensional model were as much as twice the depth of the estimates from the one-dimensional model. These results can be attributed to higher approach velocities and the appreciable flow angles at the piers simulated by the two-dimensional model and verified in the field. Computed flood-frequency estimates of the 10-, 50-, 100-, and 500-year return-period floods on the Tar River at Greenville were also simulated with both the one- and two-dimensional models. The simulated water-surface profiles and velocity fields of the various return-period floods were used to compare the modeling approaches and provide information on what return-period discharges would result in road over-topping and(or) pressure flow. This information is essential in the design of new and replacement structures. The ability to accurately simulate water-surface elevations and velocity magnitudes and distributions at bridge crossings is essential in assuring that bridge plans balance public safety with the most cost-effective design. By compiling pertinent bridge-site characteristics and relating them to the results of several model-comparison studies, the framework for developing guidelines for selecting the most appropriate model for a given bridge site can be accomplished.
NASA Astrophysics Data System (ADS)
Portugués Mollá, Iván; Felici, Xavier Bonache i.; Mateu Bellés, Joan F.; Segura, Juan B. Marco
2015-04-01
Flash-floods are recurrent events in the Mediterranean arch, mostly derived from cold air pool phenomena triggering hydro-geomorphic high-intensity processes, combining high discharge and low frequency. In urban environments the complexity of the processes become higher due to the existence of very fast-response basins and quick-response runoff. However, immediate activities of cleaning up and restoration delete the urban marks. After a short time both significance and dimension of the hydro-geomorphic event become completely unrecognizable. Nevertheless, these episodes generate extensive administrative documentation which is testimony of the processes in almost real time. Exploiting this source typology in order to reconstruct events far in time within urban areas, which may lack database sufficiently rich, is necessary to understand the hydrological and hydraulic derived processes. This is particularly the case of the Valencia flash-flood (1957), located in the lower Turia River basin (6.400 km2). Within a short interval (15 hours) there were registered two flood peaks (estimated at that time at 2.500 and 3.700 m3/s). The double overflowing inundated a large proportion of the urban area. The flash-flood activated fast processes with high energy that left numerous hydro-geomorphic marks. Although those tracks were deleted in a short while after the flood, it remains a legacy that had not yet been exploited, consisting of immediate aerial and oblique high resolution photography, pictures at street level, water level record and administrative records, such as claim files for compensation. Paradoxically, despite the event is considered as a milestone on metropolitan territorial planning and it was decided to divert the river Turia definitely through a major project (12 km of channeling, known as South Solution), being the scenario notably altered, the analysis of the hydrological and hydraulic process has never been reviewed. Undoubtedly, a modern study would ensure a more effective and accurate risk management within the Valencian metropolitan area. The development of a GIS-based model enables the utilization of these materials, most of them unpublished. This non-systematic information can be treated jointly from a new perspective. In short, this model facilitates the provision of a database through a vast amount of organized, structured and georeferenced information about the event. In a second stage, it makes possible to interpret the hydro-geomorphic processes from the 1957 event (trenches along barrier beaches, erosion, deposition processes…) and hydraulic processes (main flow encroachment versus quasi-hydrostatic-flood, or 1D versus 2D flood behavior), which can be identified in order to obtain georeferenced information about spatial variability, directional information of flows and point distribution of water levels and flooded points. It is also necessary to carry out photo-interpretation works to clarify some unresolved issues with the objective of establishing the real order of magnitude of the flash-flood concerning the discharge rank. In the same way, some other elements can be identified such as urban streams along the streets, levees overtopping and breaks, flooded area, etc. Lastly, in the future the GIS database will enable to obtain a more accurate both hydraulic mathematical modelling and calibration/validation.
The use of coastal altimetry to support storm surge studies in project eSurge
NASA Astrophysics Data System (ADS)
Cipollini, P.; Harwood, P.; Snaith, H.; Vignudelli, S.; West, L.; Zecchetto, S.; Donlon, C.
2012-04-01
One of the most promising applications of the new field of coastal altimetry, i.e. the discipline aiming to recover meaningful estimates of geophysical parameters (sea level, significant wave height and wind speed) from satellite altimeter data in the coastal zone, is the study of storm surges. The understanding and realistic modelling of surges supports both preparation and mitigation activities and should eventually bring enormous societal benefits, especially to some of the world's poorest countries (like Bangladesh). Earth Observation data have an important role to play in storm surge monitoring and forecasting, but the full uptake of these data by users (such as environmental agencies and tidal prediction centres) must first be encouraged by showcasing their usefulness, and then supported by providing easy access. Having recognized the above needs, The European Space Agency has recently launched a Data User Element (DUE) project called eSurge. The main purposes of eSurge are a) to contribute to an integrated approach to storm surge, wave, sea-level and flood forecasting through Earth Observation, as part of a wider optimal strategy for building an improved forecast and early warning capability for coastal inundation; and b) to increase the use of the advanced capabilities of ESA and other satellite data for storm surge applications. The project is led by Logica UK, with NOC (UK), DMI (Denmark), CMRC (Ireland) and KNMI (Netherlands) as scientific partners. A very important component of eSurge is the development, validation and provision of dedicated coastal altimetry products, which is the focus of the present contribution. Coastal altimetry has a prominent role to play as it measures the total water level envelope directly, and this is one of the key quantities required by storm surge applications and services. But it can also provide important information on the wave field in the coastal strip, which helps the development of more realistic wave models that in turn can be used to improve the forecast of wave setup and overtopping processes. We will present examples of how altimetry has captured a few significant surge events in European Seas, and we will describe how a multi-mission coastal altimetry processor is going to be integrated in the eSurge system. The delayed-time reprocessed coastal altimetry data will be blended with tide gauge data to extract the main modes of variability in the coastal regions. Then data from the tide gauges can be used to estimate water level in real time, based on the modes of variability found. In a later phase of the project, the eSurge coastal altimetry processor will be extended to be able to ingest Near-Real-time (NRT) raw altimetric waveforms and generate the relevant NRT products, a definite first for coastal altimetry. The pilot regions for this application will be the European Seas (where an area of specific interest is the Northern Adriatic, which is being investigated within a related initiative called eSurge-Venice) and the North Indian Ocean. In summary, we expect eSurge to be one of the first pre-operational applications of coastal altimetry and a proof of the benefits to society that can be brought by this relatively new branch of marine remote sensing.
Waller, Roger M.; Stanley, Kirk W.
1966-01-01
The March 27, 1964, earthquake shook the Homer area for about 3 minutes. Land effects consisted of a 2- to 6-foot subsidence of the mainland and Homer Spit, one earthflow at the mouth of a canyon, several landslides on the Homer escarpment and along the sea bluffs, and minor fissuring of the ground, principally at the edges of bluffs and on Homer Spit. Hydrologic effects consisted of at least one and possibly two submarine landslides at the end of the spit, seiche waves in Kachemak Bay, ice breakage on Beluga Lake, sanding of wells, and a temporary loss of water in some wells. Seismic damage to the community was light in comparison with that of other communities closer to the epicenter. One submarine landslide, however, took out most of the harbor breakwater. The greatest damage was due to the subsidence of the spit, both tectonically (2–3 ft) and by differential compaction or lateral spreading (an additional 1–4 ft). Higher tides now flood much of the spit. The harbor and dock had to be replaced, and buildings on the end of the spit had to be elevated. Protection works for other buildings and the highway were needed. These works included application of fill to raise the highway and parts of the spit above high tides. Reconstruction costs and disaster loans totaled about $2½ million, but this amount includes added improvement costs over preexisting values. Homer Spit in particular and the Homer area in general rank as areas where precautions must be taken in selecting building sites. The hazards of landslides, earthflows, compaction and submarine slumping—all of which might be triggered by an earthquake—should be considered in site selection. In plan, Homer Spit resembles a scimitar with its curving blade pointed seaward. It is about 4 miles long and as much as 1,500 feet wide. The spit is composed largely of gravel intermixed with some sand. After the earthquake and the resulting tectonic subsidence and compaction, much of the spit was below high-tide levels and consequently flooded periodically. The entire beach face has retreated. Much of the material eroded from the beach has been redeposited to form a new storm or frontal berm, locally migrating around buildings and covering roads. Beach recession of 10–15 feet is probably the overall average; maximum recession 1 year after the earthquake was 56 feet along one limited section of the distal end of the spit. Subsidence of the mainland has caused accelerated erosion of the beaches and headlands that have been—and are—source areas for the material deposited on Homer Spit. The resulting increased supply of gravel and sand probably will cause the spit to widen gradually on the Cook Inlet side. Similarly, the new frontal berm will probably grow to a height sufficient to prevent overtopping by all but the larger storm swashes. The nature of shore processes on the spit has not been materially altered by subsidence, but the rates of erosion and deposition have been accelerated. The lasting effect of subsidence (excluding flooding) will be enlargement of the beach on the Cook Inlet side and gradual wasting of the beach on the bay side of the spit.
NASA Astrophysics Data System (ADS)
Vespremeanu-Stroe, Alfred; Zăinescu, Florin; Tătui, Florin; Preoteasa, Luminişa
2017-04-01
Barrier islands and spits are among the most dynamic and vulnerable coastal features. Sacalin formed at the southernmost Danube mouth (Sfântu Gheorghe arm), representing the youngest downdrift island/spit of the Sfântu Gheorghe deltaic lobe, which previously formed several similar downdrift barrier islands during its cyclic pattern of long-term development (1400 BP - present). In this study, we document a 120 yr record of coastal changes that occurred since the emergence of Sacalin Island (1897), following a major flood, occasioned by its development through constant elongation (towards south) and backwards migration. The barrier island/spit is frequently breached in the central part (narrow inlets) and it experiences episodes of large elongation and retreat rates (up to 300 m/year and 60 m/year). Using successive georeferenced maps, satellite images and field measurements, we derived several morphodynamic indices which were analysed in correspondence with the storm climate. The coastal storms temporal variability shows four active intervals (1962-1972, 1975-1977, 1995-1998, 2002-2004) with highly intensive erosional and accretional processes, and three calm periods (1989-1994, 1999-2001, 2005-2015), with a decrease of 40-70 % of the shoreline migration rates. On the other hand, the successive barrier configurations show a distinct evolutionary pattern of its central sector, controlled by the (subaerial) barrier widths. Thus, following an extraordinary high storm (or storm season), the narrower barrier sectors will benefit from a new generation of breach deposition and washover fans. They will further contribute to the reconfiguration of the barrier on a backward position, where it attains significantly larger widths (250-500 m for the subaerial part) which for a while will inhibit the new large overwash formation able to expand the barrier into the lagoon. After such a "widening episode", the time intervals of barrier backline stability (i.e. unaffected by overwash) are of 10-30 years, depending on the storm climate. Therefore, the multi-decadal transformations of the central Sacalin depend on the interplay between storm regime and barrier widths, which points to a major influence of the morphodynamic feedbacks in modulating the storm morphological impact and imposing a rhythmic evolution of the barrier, with the narrow sectors becoming wide and vice-versa. Nevertheless, large oscillations in storm regime may induce unusual barrier morphodynamics. It was the case of the last calm interval (2005-2015), in fact an exceptional negative anomaly, when the storm frequency decreased to half of the multi-decadal average. As a consequence, the formation of washover fans was inhibited and restricted to only a few small-size fans, contributing to the unprecedented central barrier narrowing. In these conditions, during 2012-2013 winter, an atypical southern storm (December 2012), very short but intense, produced a high storm surge which caused massive overtopping in the central part of the spit, favoured by the small width of the island in this sector, creating an exceptional large breach (of ca. 2 km). In the next two months, even low storms enlarged the breach, transforming it into the biggest breaching (3.5 km wide) ever recorded in more than 100 yr of Sacalin evolution. This case documents how a prolonged low storminess interval may trigger barrier island destabilisation or even destruction.
Huizinga, Richard J.
2008-01-01
In cooperation with the Missouri Department of Transportation, the U.S. Geological Survey determined hydrologic and hydraulic parameters for the Gasconade River at the site of a proposed bridge replacement and highway realignment of State Highway 17 near Waynesville, Missouri. Information from a discontinued streamflow-gaging station on the Gasconade River near Waynesville was used to determine streamflow statistics for analysis of the 25-, 50-, 100-, and 500-year floods at the site. Analysis of the streamflow-gaging stations on the Gasconade River upstream and downstream from Waynesville indicate that flood peaks attenuate between the upstream gaging station near Hazelgreen and the Waynesville gaging station, such that the peak discharge observed on the Gasconade River near Waynesville will be equal to or only slightly greater (7 percent or less) than that observed near Hazelgreen. A flood event occurred on the Gasconade River in March 2008, and a flood measurement was obtained near the peak at State Highway 17. The elevation of high-water marks from that event indicated it was the highest measured flood on record with a measured discharge of 95,400 cubic feet per second, and a water-surface elevation of 766.18 feet near the location of the Waynesville gaging station. The measurements obtained for the March flood resulted in a shift of the original stage-discharge relation for the Waynesville gaging station, and the streamflow statistics were modified based on the new data. A two-dimensional hydrodynamic flow model was used to simulate flow conditions on the Gasconade River in the vicinity of State Highway 17. A model was developed that represents existing (2008) conditions on State Highway 17 (the 'model of existing conditions'), and was calibrated to the floods of March 20, 2008, December 4, 1982, and April 14, 1945. Modifications were made to the model of existing conditions to create a model that represents conditions along the same reach of the Gasconade River with preliminary proposed replacement bridges and realignment of State Highway 17 (the 'model of proposed conditions'). The models of existing and proposed conditions were used to simulate the 25-, 50-, 100-, and 500-year recurrence floods, as well as the March 20, 2008 flood. Results from the model of proposed conditions show that the proposed replacement structures and realignment of State Highway 17 will result in additional backwater upstream from State Highway 17 ranging from approximately 0.18 foot for the 25-year flood to 0.32 foot for the 500-year flood. Velocity magnitudes in the proposed overflow structures were greater than in the existing structures [by as much as 4.9 feet per second in the left (west) overflow structure for the 500-year flood], and shallow, high-velocity flow occurs at the upstream edges of the abutments of the proposed overflow structures in the 100- and 500-year floods where flow overtops parts of the existing road embankment that will be left in place in the proposed scenario. Velocity magnitude in the main channel of the model of proposed conditions increased by a maximum of 1.2 feet per second over the model of existing conditions, with the maximum occurring approximately 1,500 feet downstream from existing main channel structure J-802.
NASA Astrophysics Data System (ADS)
Petley, D. N.
2013-12-01
Kedarnath is small town built around in important Hindu temple in the Rudraprayag district, Uttarakhand in northern India. Located at an elevation of 3,583 m, it is situated in a remote valley with no vehicular access. In summer, the temple is an important pilgrimage destination, with thousands of visitors per day, all of whom have to access the location via a 14 km trek or horse ride along a paved pathway, or via a helicopter ride. Between 14th and 17th June 2013, Uttarakhand was affected by unusually heavy early monsoonal rainfall. Whilst the rainfall totals did not reach record levels, the precipitation fell onto thawing snow, inducing very large debris flows. Kedarnath was affected by two major debris flows. According to eyewitness reports the first struck without warning in the evening of 16th June at about 7 pm local time. The second, larger, event occurred the following morning at about 6 am. The two debris flows destroyed most of the buildings in Kedarnath, although the temple survived with some damage. Across Uttarakhand it is estimated that about 5700 people died in the debris flows; the majority of these losses were at Kedarnath and in the immediate downstream communities. In the aftermath of the disaster there was considerable uncertainty as to the cause of the debris flows, with much speculation about the possibility that either a rock avalanche had developed on the flanks of the adjacent mountains or that there had been a catastrophic glacial collapse event upstream of the town. On 18th June the Indian Remote Sensing Organisation (IRSO) captured and released a RISAT-1 image of Kedarnath. Although the resolution was insufficient to determine what had occurred to trigger the disaster, it served to highlight two potential sources of the debris flows. One of these was an area of disturbance at the snout of the Charobari Glacier upslope from the town; the other was a possible landslide scar on an adjacent slope. On 23rd June 2013 NASA captured a Landsat 8 image of the site, which suggested that both of these sources might have been responsible for the debris flows. Finally, on 27th June IRSO released a high resolution RISAT-1 image of the Kedarnath region. This showed clearly that the first (16th June) debris flow originated from a landslide event upstream and to the east of the town. This took the form of an initially small, superficial landslide that entrained large volumes of debris before striking the town as a highly mobile debris flow. The second debris flow (on 17th June) was caused when an ephemeral lake, trapped behind a lateral moraine from the Charobari glacier upstream and to the east of the town, overtopped and catastrophically breached its barrier. The resultant flood scoured a large volume of sediment from the steep channel above the town, generating a very dense debris flow that was exceptionally destructive. Subsequent analyses by ground-based teams has suggested that this initial interpretation from remotely-sensed data was correct. Both of the sources of the debris flows were clearly evident on images captured before the event, and it is also clear that temple and the adjacent town were built on a terrace constructed in an earlier debris event. Thus, remotely sensed images could have played a role in the management of the hazard prior to the disaster.
Striker, Lora K.; Medalie, Laura
1997-01-01
ft, an average channel top width of 37 ft and an average bank height of 4 ft. The channel bed material ranges from sand to cobble with a median grain size (D50) of 32.9 mm (0.108 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 9, 1995, indicated that the reach was laterally unstable due to cut-banks, point bars, and loose unconsolidated bed material. The Town Highway 2 crossing of Coles Brook is a 74-ft-long, two-lane bridge consisting of one 71-foot steel-beam span (Vermont Agency of Transportation, written communication, April 5, 1995). The opening length of the structure parallel to the bridge face is 69.3 ft. The bridge is supported by spill-through abutments. The channel is skewed approximately 35 degrees to the opening while the measured opening-skew-to-roadway is 15 degrees. A scour hole 1.5 ft deeper than the mean thalweg depth was observed from 60 ft. to 100 ft. downstream during the Level I assessment. Scour protection measures at the site include: type-1 stone fill (less than 12 inches diameter) along the right bank upstream, at the downstream end of the downstream left wingwall and downstream right wingwall; and type-2 stone fill (less than 36 inches diameter) along the left bank upstream, at the upstream end of the upstream right wingwall, and along the entire base of the left and right abutments. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.8 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge. Abutment scour ranged from 5.7 to 12.9 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Huizinga, Richard J.
2007-01-01
The evaluation of scour at bridges throughout the State of Missouri has been ongoing since 1991, and most of these evaluations have used one-dimensional hydraulic analysis and application of conventional scour depth prediction equations. Occasionally, the complex conditions of a site dictate a more thorough assessment of the stream hydraulics beyond a one-dimensional model. This was the case for structure A-1700, the Interstate 155 bridge crossing the Mississippi River near Caruthersville, Missouri. To assess the complex hydraulics at this site, a two-dimensional hydrodynamic flow model was used to simulate flow conditions on the Mississippi River in the vicinity of the Interstate 155 structure A-1700. The model was used to simulate flow conditions for three discharges: a flood that occurred on April 4, 1975 (the calibration flood), which had a discharge of 1,658,000 cubic feet per second; the 100-year flood, which has a discharge of 1,960,000 cubic feet per second; and the project design flood, which has a discharge of 1,974,000 cubic feet per second. The project design flood was essentially equivalent to the flood that would cause impending overtopping of the mainline levees along the Mississippi River in the vicinity of structure A-1700. Discharge and river-stage readings from the flood of April 4, 1975, were used to calibrate the flow model. The model was then used to simulate the 100-year and project design floods. Hydraulic flow parameters obtained from the three flow simulations were applied to scour depth prediction equations to determine contraction, local pier, and abutment scour depths at structure A-1700. Contraction scour and local pier scour depths computed for the project design discharge generally were the greatest, whereas the depths computed for the calibration flood were the least. The maximum predicted total scour depth (contraction and local pier scour) for the calibration flood was 66.1 feet; for the 100-year flood, the maximum predicted total scour depth was 74.6 feet; for the project design flood, the maximum predicted total scour depth was 93.0 feet. If scour protection did not exist, bent 14 and piers 15 through 21 would be substantially exposed or undermined by the predicted total scour depths in all of the flood simulations. However, piers 18 through 21 have a riprap blanket around the base of each, and the riprap blanket observed on the right bank around bent 14 is thought to extend around the base of pier 15, which would limit the amount of scour that would occur at these piers. Furthermore, the footings and caissons that are not exposed by computed contraction scour may arrest local pier scour, which will limit local pier scour at several bents and piers. Nevertheless, main-channel piers 16 and 17 and all of the bents on the left (as viewed facing downstream) overbank are moderately to substantially exposed by the predicted scour depths from the three flood simulations, and there is no known scour protection at these piers or bents. Abutment scour depths were computed for structure A-1700, but abutment scour is expected to be mitigated by the presence of guidebanks upstream from the bridge abutments, as well as riprap revetment on the abutment and guidebank faces.
NASA Astrophysics Data System (ADS)
Camici, Stefania; Moramarco, Tommaso; Brocca, Luca; Melone, Florisa; Lapenna, Vincenzo; Perrone, Angela; Loperte, Antonio
2010-05-01
On 1st January 2006, during an ordinary flood event, a levee failure along the Foenna stream caused the flooding in the urban area of Sinalunga, a small town located in Tuscany region (Italy). The event was monitored by a public agency with the responsibility for the control and maintenance of the natural channel networks. Long time before of flooding, people living in the surrounding area of the stream blamed the presence of wild animals and of numerous burrows along the levees. Although the numerous actions of maintenance along the levees mainly for removing the burrows, a levee seepage occurred during that flood. The presence of an outflow located on the downstream face, almost 2 m below the levee top, caused the spurt of brown water denoting the presence of sediment erosion. On the upstream face of levee, a little hole of about 30 cm at the same height of the outflow was discovered. Although the agency workers tried to close the hole by using appropriate blankets, in short time the top of the levee subsided and the overtopping flow caused a trapezoidal breach typical for an earth-fill embankment. The formation of breach was so fast that in a little more of one hour the urban area near to the Foenna stream was flooded causing high economic damages. Mechanisms triggered the levees failure are the object of this work. The analysis of the event has been first addressed to assess the state of-fact of levees conditions along the Foenna stream, thus to understand how much the activity of wild animals, in particular that of porcupine, may have affected the hydraulic safety of the embankment. At the purpose, after the event, topographical surveys of cross sections have been done along with tomographic surveys by geoelectric technique for investigating the possible presence, besides of burrows, also of tunnels dug into the levees by animals. Then, the analysis of hydrometeorological conditions of the event has allowed to better understand the evolution of the flood and if its magnitude was able to affect the hydraulic holding of levees. Finally, the seepage vulnerability of these levees has been also assessed to address their hydraulic safety applying two models based on a steady and unsteady infiltration, respectively. Based on the obtained results, the following findings can be drawn. 1) The levees failure near the Sinalunga urban area is certainly due to the presence of the porcupine burrow at middle height of upstream face of levee that has addressed the flow into the embankment and then triggered the seepage phenomenon. 2) The works of the maintenance finalized to the closure of the burrows carried out before of the flood event were necessary but not sufficient to prevent the failure of levees. 3) To prevent the failure due to burrows presence, the levees maintenance should have been addressed through both the closure of burrows and the capture of wild animals; if this action had been done for the Foenna stream then the probability of failure would have been truly low. This last aspect has been also inferred through geoelectrical tomography surveys that showed the possible presence of at least two tunnels along both faces of levees, so emphasizing as the various closure of burrows made in the past by maintenance agency were totally useless. 4) The seepage vulnerability analysis has shown that levees might be to risk of failure for floods whose durations are consistent with the ones might occur in the Foenna basin. However, for this particular event the levees failure can be only ascribed to wild animals activity, seeing that the seepage was caused by a burrow hole.
A probabilistic storm surge risk model for the German North Sea and Baltic Sea coast
NASA Astrophysics Data System (ADS)
Grabbert, Jan-Henrik; Reiner, Andreas; Deepen, Jan; Rodda, Harvey; Mai, Stephan; Pfeifer, Dietmar
2010-05-01
The German North Sea coast is highly exposed to storm surges. Due to its concave bay-like shape mainly orientated to the North-West, cyclones from Western, North-Western and Northern directions together with astronomical tide cause storm surges accumulating the water in the German bight. Due to the existence of widespread low-lying areas (below 5m above mean sea level) behind the defenses, large areas including large economic values are exposed to coastal flooding including cities like Hamburg or Bremen. The occurrence of extreme storm surges in the past like e.g. in 1962 taking about 300 lives and causing widespread flooding and 1976 raised the awareness and led to a redesign of the coastal defenses which provide a good level of protection for today's conditions. Never the less the risk of flooding exists. Moreover an amplification of storm surge risk can be expected under the influence of climate change. The Baltic Sea coast is also exposed to storm surges, which are caused by other meteorological patterns. The influence of the astronomical tide is quite low instead high water levels are induced by strong winds only. Since the exceptional extreme event in 1872 storm surge hazard has been more or less forgotten. Although such an event is very unlikely to happen, it is not impossible. Storm surge risk is currently (almost) non-insurable in Germany. The potential risk is difficult to quantify as there are almost no historical losses available. Also premiums are difficult to assess. Therefore a new storm surge risk model is being developed to provide a basis for a probabilistic quantification of potential losses from coastal inundation. The model is funded by the GDV (German Insurance Association) and is planned to be used within the German insurance sector. Results might be used for a discussion of insurance cover for storm surge. The model consists of a probabilistic event driven hazard and a vulnerability module, furthermore an exposure interface and a financial module to account for specific (re-) insurance conditions. This contribution will mainly concentrate on the hazard module. The hazard is covered by an event simulation engine enabling Monte Carlo simulations. The event generation is done on-the-fly. A classification of historical storm surges is used based on observed sea water levels at gauging stations and extended literature research. To characterize the origin of storm events and storm surges caused by those, also meteorological parameters like wind speed and wind direction are being used. If high water levels along the coast are mainly caused by strong wind from particular directions as observed at the North Sea, there is a clear empirical relationship between wind and surge (where surge is defined as the wind-driven component of the sea water level) which can be described by the ATWS (Average Transformed Wind speed). The parameters forming the load at the coastal defense elements are water level and wave parameters like significant wave height, wave period and wave direction. To assess the wave characteristics at the coast the numerical model SWAN (Simulating Waves Near Shore) from TU Delft has been used. To account for different probabilities of failure and inundation the coast is split into segments with similar defense characteristics like type of defense, height, width, orientation and others. The chosen approach covers the most relevant failure mechanisms for coastal dikes induced by wave overtopping and overflow. Dune failure is also considered in the model. Inundation of the hinterland after defense failure is modeled using a simple dynamical 2d-approach resulting in distributed water depths and flood outlines for each segment. Losses can be estimated depending on the input exposure data either coordinate based for single buildings or aggregated on postal code level using a set of depths-damage functions.
Larsen, Curt; Clark, Inga; Guntenspergen, Glenn; Cahoon, Don; Caruso, Vincent; Hupp, Cliff; Yanosky, Tom
2004-01-01
The Blackwater National Wildlife Refuge (BNWR), on the Eastern Shore of Chesapeake Bay (figure 1), occupies an area less than 1 meter above sea level. The Refuge has been featured prominently in studies of the impact of sea level rise on coastal wetlands. Most notably, the refuge has been sited by the Intergovernmental Panel on Climate Change (IPCC) as a key example of 'wetland loss' attributable to rising sea level due to global temperature increase. Comparative studies of aerial photos taken since 1938 show an expanding area of open water in the central area of the refuge. The expanding area of open water can be shown to parallel the record of sea level rise over the past 60 years. The U.S. Fish and Wildlife Service (FWS) manages the refuge to support migratory waterfowl and to preserve endangered upland species. High marsh vegetation is critical to FWS waterfowl management strategies. A broad area once occupied by high marsh has decreased with rising sea level. The FWS needs a planning tool to help predict current and future areas of high marsh available for waterfowl. 'Wetland loss' is a relative term. It is dependant on the boundaries chosen for measurement. Wetland vegetation, zoned by elevation and salinity (figure 3), respond to rising sea level. Wetlands migrate inland and upslope and may vary in areas depending on the adjacent land slopes. Refuge managers need a geospatial tool that allows them to predict future areas that will be converted to high and intertidal marsh. Shifts in location and area of coverage must be anticipated. Viability of a current marsh area is also important. When will sea level rise make short-term management strategies to maintain an area impractical? The USGS has developed an inundation model for the BNWR centered on the refuge and surrounding areas. Such models are simple in concept, but they require a detailed topographic map upon which to superimpose future sea level positions. The new system of LIDAR mapping of land and shallow water surfaces has solved this problem. Our team has developed a detailed LIDAR map of the BNWR area at a 30 centimeter (ca. 1 ft) contour interval (figure 2). The new map allows us to identify the present marsh vegetation zones and to predict the location and area of future zones on a decade-by- decade basis over the next century at increments of sea level rise on the order of 3 cm/decade (ca. 1 inch). We have developed two scenarios for the model. The first is a steady-state model that uses the historic rate of sea level rise of 3.1 mm/yr to predict marsh areas. The second is a 'global warming' scenario utilizing a conservative IPCC model with an exponentially-increasing rate of sea level rise. Under either scenario, the BNWR is progressively inundated with an expanding core of open water. Although their positions change in the future, the areas of intertidal marsh as well as those of the critical high marsh remain fairly constant until the year 2050. Beyond that time, the low-lying land surface is overtopped by rising sea level and the area is dominated by open water. Our model suggests that wetland habitat in the Blackwater area might be maintained and sustained through a combination of public and private preservation efforts through easements in combination with judicious Federal land acquisition into the predicted areas of suitable marsh formation - but for only the next 50 years. Beyond that time much of this area will become open water.
Forecasting approaches to the Mekong River
NASA Astrophysics Data System (ADS)
Plate, E. J.
2009-04-01
Hydrologists distinguish between flood forecasts, which are concerned with events of the immediate future, and flood predictions, which are concerned with events that are possible, but whose date of occurrence is not determined. Although in principle both involve the determination of runoff from rainfall, the analytical approaches differ because of different objectives. The differences between the two approaches will be discussed, starting with an analysis of the forecasting process. The Mekong River in south-east Asia is used as an example. Prediction is defined as forecast for a hypothetical event, such as the 100-year flood, which is usually sufficiently specified by its magnitude and its probability of occurrence. It forms the basis for designing flood protection structures and risk management activities. The method for determining these quantities is hydrological modeling combined with extreme value statistics, today usually applied both to rainfall events and to observed river discharges. A rainfall-runoff model converts extreme rainfall events into extreme discharges, which at certain gage points along a river are calibrated against observed discharges. The quality of the model output is assessed against the mean value by means of the Nash-Sutcliffe quality criterion. The result of this procedure is a design hydrograph (or a family of design hydrographs) which are used as inputs into a hydraulic model, which converts the hydrograph into design water levels according to the hydraulic situation of the location. The accuracy of making a prediction in this sense is not particularly high: hydrologists know that the 100-year flood is a statistical quantity which can be estimated only within comparatively wide error bounds, and the hydraulics of a river site, in particular under conditions of heavy sediment loads has many uncertainties. Safety margins, such as additional freeboards are arranged to compensate for the uncertainty of the prediction. Forecasts, on the other hand, have as objective to obtain an accurate hydrograph of the near future. The method by means of which this is done is not as important as the accuracy of the forecast. A mathematical rainfall-runoff model is not necessarily a good forecast model. It has to be very carefully designed, and in many cases statistical models are found to give better results than mathematical models. Forecasters have the advantage of knowing the course of the hydrographs up to the point in time where forecasts have to be made. Therefore, models can be calibrated on line against the hydrograph of the immediate past. To assess the quality of a forecast, the quality criterion should not be based on the mean value, as does the Nash-Sutcliffe criterion, but should be based on the best forecast given the information up to the forecast time. Without any additional information, the best forecast when only the present day value is known is to assume a no-change scenario, i.e. to assume that the present value does not change in the immediate future. For the Mekong there exists a forecasting system which is based on a rainfall-runoff model operated by the Mekong River Commission. This model is found not to be adequate for forecasting for periods longer than one or two days ahead. Improvements are sought through two approaches: a strictly deterministic rainfall-runoff model, and a strictly statistical model based on regression with upstream stations. The two approaches are com-pared, and suggestions are made how to best combine the advantages of both approaches. This requires that due consideration is given to critical hydraulic conditions of the river at and in between the gauging stations. Critical situations occur in two ways: when the river overtops, in which case the rainfall-runoff model is incomplete unless overflow losses are considered, and at the confluence with tributaries. Of particular importance is the role of the large Tonle Sap Lake, which dampens the hydrograph downstream of Phnom Penh. The effect of these components of river hydraulics on forecasting accuracy will be assessed.
NASA Astrophysics Data System (ADS)
Krylenko, I.; Norin, S.; Petrakov, D.; Tutubalina, O.; Chernomorets, S.
2009-04-01
In recent decades due to glacier retreat the glacial lakes in the Central Caucasus, as well as in other high-mountainous areas of the world, have expanded intensively. As result the risk of lake outbursts and destructive floods is raising. In this paper we present one of the most potentially hazardous lakes of this region - a group of glacial lakes near the Bashkara glacier in the upper Adylsu river valley, to the southeast of Mt. Elbrus. Total area of these lakes is about 100,000m2, and a total volume exceeds 1,000,000 m3. The biggest of them - the Bashkara lake has formed in late 1930s - early 1940s and the small Lapa lake has appeared in the end of 1980s. The Bashkara lake outburst occurred twice in the end of 1950s and produced devastating debris flows of ca. 2 million m3. We have monitored these lakes since 1999. Our work includes detailed field research: constant measurements of water level during warm period, annually repeated bathymetric surveys, geodetic surveys, observations on dam condition and some special measurements (i.e. water temperature distribution, current velocity). Also we use aerial and satellite images to obtain data about dynamic of areas for the lakes. From 2001 to 2006 years volume of the Lapa lake has increased 5 times (from 30,000 m3 to 140,000 m3), the Bashkara lake in this period was quasi-stable. In 2006-2008 volume of the Lapa lake has decreased due to sedimentation, however, rapid growth of water level in Bashkara lake (more than 20 sm. per day) has suddenly begun. As a result, volume of the Bashkara lake exceeded 1,000000 m3 in July 2008 whereas in 2001 -2007 year it was about 800,000 m3. Previous maximum of water level was exceeded on 3,5 m, moraine dam with ice core was overtopped and overflow has started. Thus, Bashkara glacier lakes are unstable and risk of outburst is increasing. To assess parameters and zones of potential outburst flood in the Adylsu River valley we have carried out hydrodynamic simulation. Two computer models, based on solving of two-dimensional Saint-Venant equations -"River" (the Russia, author V.Belikov) and "Flo-2D" (the USA, authors J.S.O'Brien, R.Garcia) were used. The "River" model is based on the irregular triangular grid, therefore it is possible to calculate flow in details. On the other hand there is no debris flow block in this model yet and "Flo-2D" was applied to calculate potential debris flow parameters, because transformation of flood into debris flow is likely here. Input data for simulation were following: digital terrain model of Adylsu valley, made on the on the basis of map with scale 1:25000, outburst hydrograph, calculated for case of englacial drainage channels formation (Vinogradov's model, Russia), some empirical relationships between volume of the glacial lake and maximum discharge of outburst (i.e. Clague and Mathews, Walder and Costa) were also applied. The mean value of the maximum discharge for potential outburst obtained by different methods was about 150 m3 /c. According to results of hydrodynamic modelling, movement of flood wave downstream the valley will be fast, peak of flood will cover distance from upper part of valley to lowest (8 km) for about half an hour. The depth of the flow on the floodplain is about 1-1.5 m and could reach 6 m in some sites. There are hotel, large camping site and several bridges in the hazardous zone. In 2008 early warning system was designed and installed at the Bashkara lake.
Burns, Ronda L.; Wild, Emily C.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure ANDOVT00110039 on State Route 11 crossing the Middle Branch Williams River, Andover, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in southern Vermont. The 5.75-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest on the upstream left bank and downstream right bank. The surface cover on the upstream right and downstream left banks is brush. In the study area, the Middle Branch Williams River has an incised, sinuous channel with a slope of approximately 0.01 ft/ft, an average channel top width of 58 ft and an average bank height of 8 ft. The channel bed material ranges from sand to boulder with a median grain size (D50) of 96.8 mm (0.317 ft). The geomorphic assessment at the time of the Level I and Level II site visit on September 9, 1996, indicated that the reach was laterally unstable. The State Route 11 crossing of the Middle Branch Williams River is a 43-ft-long, two-lane bridge consisting of one 41-foot concrete-beam span and two additional steel beams on the upstream face (Vermont Agency of Transportation, written communication, March 29, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 45 degrees to the opening while the opening-skew-to-roadway is 45 degrees. The only scour protection measures at the site was type-2 stone fill (less than 36 inches diameter) at the upstream end of the upstream right wingwall and type-3 stone fill (less than 48 inches diameter) along the entire base length of the upstream left wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.8 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 8.9 to 11.2 ft. The worst-case abutment scour occurred at the incipient-overtopping discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Wild, Emily C.; Flynn, Robert H.
1998-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure WWINTH00300033 on Town Highway 30 crossing Mill Brook, West Windsor, Vermont (Figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (FHWA, 1993). Results of a Level I scour investigation also are included in appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in appendix D. The site is in the New England Upland section of the New England physiographic province in east-central Vermont. The 24.9-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture upstream of the bridge while the immediate banks have dense woody vegetation. Downstream of the bridge is forested. In the study area, Mill Brook has an incised, sinuous channel with a slope of approximately 0.004 ft/ft, an average channel top width of 58 ft and an average bank height of 5 ft. The channel bed material ranges from sand to boulder with a median grain size (D50) of 65.7 mm (0.215 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 5, 1996, indicated that the reach was stable. The Town Highway 30 crossing of the Mill Brook is a 46-ft-long, one-lane covered bridge consisting of a 40-foot wood-beam span (Vermont Agency of Transportation, written communication, March 23, 1995). The opening length of the structure parallel to the bridge face is 36.3 ft. The bridge is supported by vertical, concrete capped laid-up stone abutments with wingwalls. The channel is skewed approximately 10 degrees to the opening while the opening-skew-to-roadway is zero degrees. The only scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) along the upstream right bank, the upstream right wingwall, the right abutment and the downstream left wingwall. Additional details describing conditions at the site are included in the Level II Summary and appendices D and E.Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and Davis, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge was analyzed since it had the potential of being the worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.1 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 6.0 to 16.0 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Olson, Scott A.
1996-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure HARDELMSTR0042 on Elm Street crossing Cooper Brook, Hardwick, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in north-central Vermont. The 16.6-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the overbanks are primarily grass covered with some brush along the immediate channel banks except the upstream right bank and overbank which is forested and the downstream left overbank which has a lumberyard. In the study area, Cooper Brook has a sinuous channel with a slope of approximately 0.005 ft/ft, an average channel top width of 50 ft and an average channel depth of 6 ft. The predominant channel bed materials are sand and gravel with a median grain size (D50) of 1.25 mm (0.00409 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 24, 1995, indicated that the reach was stable. The Elm Street crossing of Cooper Brook is a 39-ft-long, two-lane bridge consisting of one 37-foot concrete span (Vermont Agency of Transportation, written communication, March 17, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 40 degrees to the opening while the opening-skew-to-roadway is 45 degrees. On August 17, 1995 the site was revisited to investigate the effect of the August 4-5, 1995 flood on the structure. Channel features such as scour holes and point bars were shifted by the high flow event. Details of these changes can be found in the Level I data form in Appendix E. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and G. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 3.4 ft. The worst-case contraction scour occurred at the incipient-overtopping discharge which was less than the 100-year discharge. Abutment scour ranged from 7.1 to 10.4 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1993, p. 48). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Tornadogenesis in Simulated Supercells from VORTEX2 Environments
NASA Astrophysics Data System (ADS)
Coffer, Brice Evan
Despite an increased understanding of the environments that favor tornado formation, a high false-alarmrate for tornado warnings still exists. The composite near-stormenvironments of nontornadic and tornadic supercells sampled during the second Verification of the Origins of Rotation in Tornadoes Experiment (VORTEX2) both appear to be generally favorable for supercells and tornadoes. It has not been clear whether small differences between the two environments (e.g., more streamwise horizontal vorticity in the lowest few hundred meters above the ground in the tornadic composite) are actually determinative of storms' tornadic potential. From the VORTEX2 composite environments, simulations of a nontornadic and a tornadic supercell are used to investigate storm-scale differences that ultimately favor tornadogenesis or tornadogenesis failure. Both environments produce strong supercells with robust mid-level mesocyclones and hook echoes, though the tornadic supercell has a more intense low-level updraft and develops a tornado-like vortex exceeding the EF3 wind speed threshold. In contrast, the nontornadic supercell only produces shallow vortices, which never reach the EF0 wind speed threshold. Even though the nontornadic supercell readily produces subtornadic surface vortices, these vortices fail to be stretched by the low-level updraft. This is due to a disorganized low-level mesocyclone caused by predominately crosswise vorticity in the lowest few hundred meters above ground level within the nontornadic environment. In contrast, the tornadic supercell ingests predominately streamwise horizontal vorticity, which promotes a strong low-level mesocyclone with enhanced dynamic lifting and stretching of surface vertical vorticity. These results support the idea that larger streamwise vorticity leads to a more intense low-level mesocyclone, whereas predominately crosswise vorticity yields a less favorable configuration of the low-level mesocyclone for tornadogenesis. Since it is known that not every stormin seemingly favorable environments is tornadic, either our knowledge of environmental controls on tornadoes is incomplete, or there are factors beyond the environment that determine whether a supercell produces a tornado or not. In other words, tornado formation could be a volatile process that is largely internal to each storm. To assess this, an ensemble of thirty supercell simulations was constructed based on small variations to the nontornadic and tornadic environmental profiles composited from VORTEX2. All simulations produce distinct supercells despite occurring in similar environments. Both the tornadic and nontornadic ensemble members possess ample subtornadic surface vertical vorticity; the determinative factor is whether this vorticity can be converged and stretched by the low-level updraft. Each of the fifteen members in the tornadic VORTEX2 ensemble produces a long-track, intense tornado. Although there are notable differences in the precipitation and near-surface buoyancy fields, each stormfeatures strong dynamic lifting of surface air with vertical vorticity. This lifting is due to a steady low-level mesocyclone, which is linked to the ingestion of predominately streamwise environmental vorticity. In contrast, each nontornadic VORTEX2 simulation features a supercell with a disorganized low-level mesocyclone, due to crosswise vorticity in the lowest few hundred meters in the nontornadic environment. This generally leads to insufficient dynamic lifting and stretching to accomplish tornadogenesis. Even so, forty percent of the nontornadic VORTEX2 ensemble members becomeweakly tornadic. This implies that chaotic within-stormdetails can still play a role, and occasionally lead to marginally tornadic vortices in suboptimal storms. It is also unclear whether systematically varying the lower-tropospheric horizontal vorticity will yield a "tipping point" between nontornadic and tornadic supercells. Additional simulations have been conducted where the environment is systematically varied between the nontornadic and tornadic VORTEX2 composite profiles. The low-level wind profiles are linearly interpolated between the two composites (20/40/60/80%). The interpolated VORTEX2 simulations show that increasing lower tropospheric SRH leads to progressively more organized low-level mesocyclones and a higher probability of tornadic supercells, regardless of the upper-level winds or thermodynamic profile. The mean 0 - 500mSRH value where supercells are consistently tornadic for all the VORTEX2 interpolated simulations is 110m2 s-2. Supercells transitioned from nontornadic to tornadic when at least 40% of the tornadic low-level wind profile was introduced. This transition could not be attributed to warmer outflow temperatures nor the availability of subtornadic vertical vorticity within the hook echo. Instead, the low-level updraft was once again the discriminating factor, as a robust updraft is present directly overtop of the hook echo in each of the tornadic supercells. The fundamental feature of the nontornadic supercells is the low-level updrafts are generally disorganized, with pockets of descent present in the weak echo region. (Abstract shortened by ProQuest.).
Wild, Emily C.; Ivanoff, Michael A.
1998-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure CHESTH00100052 on Town Highway 10 crossing the South Branch Williams River, Chester, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (FHWA, 1993). Results of a Level I scour investigation also are included in appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in appendix D. The site is in the New England Upland section of the New England physiographic province in southeastern Vermont. The 4.05-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest upstream and downstream of the bridge. In the study area, the South Branch Williams River has an incised, sinuous channel with a slope of approximately 0.03 ft/ft, an average channel top width of 35 ft and an average bank height of 4 ft. The channel bed material ranges from gravel to boulders with a median grain size (D50) of 82.1 mm (0.269 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 21, 1996, indicated that the reach was unstable, as a result of the moderate bank erosion. The Town Highway 10 crossing of the South Branch Williams River is a 32-ft-long, one-lane bridge consisting of a 29-foot steel-stringer span (Vermont Agency of Transportation, written communication, March 31, 1995). The opening length of the structure parallel to the bridge face is 27.6 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 25 degrees to the opening while the opening-skew-to-roadway is 20 degrees. A scour hole 1.0 ft deeper than the mean thalweg depth was observed at the downstream end of the right abutment during the Level I assessment. The only scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) along the upstream left and right banks, the upstream end of the upstream right wingwall and the entire base length of the upstream left wingwall. Additional details describing conditions at the site are included in the Level II Summary and appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and Davis, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge was determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.8 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 5.2 to 10.8 ft. The worst-case abutment scour also occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and Davis, 1995, p. 46). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Wild, Emily C.; Degnan, James
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure ROCHTH00210034 on Town Highway 21 crossing the White River, Rochester, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, obtained from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D.The site is in the Green Mountain section of the New England physiographic province in central Vermont. The 74.8-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is suburban on the upstream and downstream left overbanks, though brush prevails along the immediate banks. On the upstream and downstream right overbanks, the surface cover is pasture with brush and trees along the immediate banks.In the study area, the White River has an incised, straight channel with a slope of approximately 0.002 ft/ft, an average channel top width of 102 ft and an average bank height of 5 ft. The channel bed material ranges from sand to cobble with a median grain size (D50) of 74.4 mm (0.244 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 23, 1996, indicated that the reach was stable.The Town Highway 21 crossing of the White River is a 72-ft-long, two-lane bridge consisting of 70-foot steel stringer span (Vermont Agency of Transportation, written communication, March 22, 1995). The opening length of the structure parallel to the bridge face is 67.0 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 15 degrees to the opening while the opening-skew-to-roadway is zero degrees.Channel scour, 1.5 ft deeper than the mean thalweg depth was observed along the left abutment and wingwalls during the Level I assessment. Scour countermeasures at the site includes type-1 stone fill (less than 12 inches diameter) along the upstream left bank and the upstream and downstream left road embankments, type-2 (less than 36 inches diameter) along the upstream end of the upstream left wingwall and downstream left bank, and type-3 (less than 48 inches diameter) along the downstream end of the downstream left wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E.Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). In addition, the incipient roadway-overtopping discharge is analyzed since it has the potential of being the worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows.Contraction scour for all modelled discharges was zero. Left abutment scour ranged from 6.8 to 21.2 ft. Right abutment scour ranged from 13.9 to 18.4 ft. The worst-case abutment scour occurred at the 500-year discharge at the left and right abutments. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution.It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Wild, Emily C.; Ivanhoff, Michael A.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure DUXBTH00120037 on Town Highway 12 crossing Ridley Brook, Duxbury, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in north central Vermont. The 10.1-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest upstream and downstream of the bridge. In the study area, Ridley Brook has an incised, straight channel with a slope of approximately 0.04 ft/ft, an average channel top width of 67 ft and an average bank height of 9 ft. The channel bed material ranges from gravel to boulders with a median grain size (D50) of 123 mm (0.404 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 1, 1996, indicated that the reach was stable. The Town Highway 12 crossing of Ridley Brook is a 33-ft-long, two-lane bridge consisting of five 30-ft steel rolled beams (Vermont Agency of Transportation, written communication, October 13, 1995). The opening length of the structure parallel to the bridge face is 30 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 50 degrees to the opening while the measured opening-skew-to-roadway is 20 degrees. A scour hole 2 ft deeper than the mean thalweg depth was observed along the right abutment and downstream right wingwall during the Level I assessment. Scour countermeasures at the site include type-2 stone fill (less than 3 feet diameter) along the upstream and downstream left road embankments, and type-3 stone fill (less than 4 feet diameter) along the upstream right bank and upstream right wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.6 to 1.7 ft. The worst-case contraction scour occurred at the 500-year discharge. Left abutment scour ranged from 5.0 to 8.3 ft, with the worst-case occurring at the incipient-overtopping discharge. Right abutment scour ranged from 13.1 to 16.7 ft, with the worst-case occurring at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Wild, Emily C.; Degnan, James
1998-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure NEWFTH00010008 on Town Highway 1 crossing Wardsboro Brook, Newfane, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (Federal Highway Administration, 1993). Results of a Level I scour investigation also are included in appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in appendix D. The site is in the New England Upland section of the New England physiographic province in southestern Vermont. The 6.91-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest on the upstream right overbank and downstream left and right overbanks. The surface cover on the upstream left overbank is pasture. In the study area, Wardsboro Brook has an incised, sinuous channel with a slope of approximately 0.02 ft/ft, an average channel top width of 63 ft and an average bank height of 9 ft. The channel bed material ranges from gravel to boulders with a median grain size (D50) of 95.4 mm (0.313 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 21, 1996, indicated that the reach was stable. The Town Highway 1 crossing of the Wardsboro Brook is a 32-ft-long, two-lane bridge consisting of a 26-foot concrete tee-beam span (Vermont Agency of Transportation, written communication, April 6, 1995). The opening length of the structure parallel to the bridge face is 26.7 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 45 degrees to the computed opening while the openingskew-to-roadway is 45 degrees. A scour hole 1.0 ft deeper than the mean thalweg depth was observed along the right abutment during the Level I assessment. Scour protection measures at the site included type-1 stone fill (less than 12 inches diameter) along the upstream right bank, and type-2 stone fill (less than 36 inches diameter) along the upstream left bank and the upstream ends of the upstream left and right wingwalls. A stone wall extends along the downstream right bank from the end of the downstream right wingwall. Additional details describing conditions at the site are included in the Level II Summary and appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and Davis, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge was determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.1 to 3.9 ft. The worst-case contraction scour occurred at the 500-year discharge. Left abutment scour ranged from 11.1 to 12.9 ft. Right abutment scour ranged from 4.3 to 4.8 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and Davis, 1995, p. 46). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Striker, Lora K.; Wild, Emily C.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure STOWTH00430036 on Town Highway 43 crossing the Miller Brook, Stowe, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in north central Vermont. The 5.5-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is predominantly forested. In the study area, the Miller Brook has an incised, sinuous channel with a slope of approximately 0.03 ft/ft, an average channel top width of 43 ft and an average bank height of 7 ft. The channel bed material ranges from gravel to boulder with a median grain size (D50) of 70.4 mm (0.231 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 15, 1996, indicated that the reach was stable. The Town Highway 43 crossing of the Miller Brook is a 24-ft-long, two-lane bridge consisting of one 21-foot steel-beam span (Vermont Agency of Transportation, written communication, October 13, 1995). The opening length of the structure parallel to the bridge face is 21.5 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 10 degrees to the opening and the computed opening-skew-to-roadway is also 10 degrees. The footing on the left abutment was exposed 2.5 ft and the footing on the right abutment was exposed 3.0 ft during the Level I assessment. Scour protection measures at the site were type-4 stone fill (less than 60 inches diameter) on the left and right bank upstream, type-3 stone fill (less than 48 inches diameter) along the entire base length of the upstream right wingwall, right abutment, and type-2 stone fill (less than 36 inches diameter) along the entire base length of the downstream right wingwall, and left and right banks downstream. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.9 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 3.1 to 6.5 ft. The worst-case abutment scour occurred at the 100-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Wild, Emily C.
1998-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure STRATH00020028 on Town Highway 2 crossing the West Branch Ompompanoosuc River, Strafford, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (FHWA, 1993). Results of a Level I scour investigation also are included in appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gathered from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in appendix D. The site is in the New England Upland section of the New England physiographic province in central Vermont. The 25.4-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture upstream and downstream of the bridge. In the study area, the West Branch Ompompanoosuc River has a sinuous channel with a slope of approximately 0.002 ft/ft, an average channel top width of 34 ft and an average bank height of 6 ft. The channel bed material ranges from silt and clay to cobbles with a median grain size (D50) of 20.4 mm (0.0669 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 24, 1996, indicated that the reach was laterally unstable, because of moderate fluvial erosion. The Town Highway 2 crossing of the West Branch Ompompanoosuc River is a 31-ft-long, twolane bridge consisting of a 26-foot concrete tee-beam span (Vermont Agency of Transportation, written communication, October 23, 1995). The opening length of the structure parallel to the bridge face is 24.6 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 45 degrees to the opening while the computed opening-skew-toroadway is 5 degrees. A scour hole 3.2 ft deeper than the mean thalweg depth was observed under the bridge along the right side of the channel during the Level I assessment. The only scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) along the upstream right bank, the upstream right wingwall, the right abutment and the downstream right wingwall. Additional details describing conditions at the site are included in the Level II Summary and appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and Davis, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge was determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 3.2 to 4.1 ft. The worst-case contraction scour occurred at the 500-year discharge. Left abutment scour ranged from 4.4 to 7.5 ft. Right abutment scour ranged from 7.2 to 10.1 ft.The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and Davis, 1995, p. 46). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Wild, Emily C.; Weber, Matthew A.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure SHARTH00040013 on Town Highway 4 crossing Broad Brook, Sharon, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D.The site is in the New England Upland section of the New England physiographic province in central Vermont. The 16.6-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is brushland on the downstream left overbank and row crops on the right overbank, while the immediate banks have dense woody vegetation. Upstream of the bridge, the overbanks are forested.In the study area, Broad Brook has an incised, sinuous channel with a slope of approximately 0.02 ft/ft, an average channel top width of 69 ft and an average bank height of 5 ft. The channel bed material ranges from sand to boulder with a median grain size (D50) of 112 mm (0.369 ft). The geomorphic assessment at the time of the Level I site visit on April 11, 1995 and Level II site visit on July 23, 1996, indicated that the reach was stable.The Town Highway 4 crossing of Broad Brook is a 34-ft-long, two-lane bridge consisting of one 31-foot concrete tee beam span (Vermont Agency of Transportation, written communication, March 23, 1995). The opening length of the structure parallel to the bridge face is 30.1 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 10 degrees to the opening while the opening-skew-to-roadway is 15 degrees.A scour hole 2.0 ft deeper than the mean thalweg depth was observed along the upstream end of the right abutment. At the downstream end of the left abutment, a 1.0 foot scour hole was observed . Scour countermeasures at the site include type-2 stone fill (less than 3 feet diameter) at each road embankment. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E.Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows.Contraction scour for all modelled flows ranged from 0.7 to 1.8 ft. The worst-case contraction scour occurred at the 500-year discharge. Left abutment scour ranged from 5.6 to 9.4 ft. The worst case left abutment scour occurred at the 500-year discharge. Right abutment scour ranged from 19.0 to 19.8 ft. The worst-case right abutment scour occurred at the incipient-overtopping discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution.It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Wild, Emily C.
1998-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure JERITH00590051 on Town Highway 59 crossing The Creek, Jericho, Vermont (figures 1– 8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (Federal Highway Administration, 1993). Results of a Level I scour investigation also are included in appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in appendix D. The site is in the Green Mountain section of the New England physiographic province and the Champlain section of the St. Lawrence physiographic province in northwestern Vermont. The 10.9-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture on the left and right overbanks, upstream and downstream of the bridge while the immediate banks have dense woody vegetation. In the study area, The Creek has a sinuous channel with a slope of approximately 0.004 ft/ft, an average channel top width of 45 ft and an average bank height of 6 ft. The channel bed material ranges from silt to cobble with a median grain size (D50) of 58.6 mm (0.192 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 3, 1996, indicated that the reach was stable. The Town Highway 59 crossing of The Creek is a 33-ft-long, two-lane bridge consisting of a 28-foot steel-stringer span (Vermont Agency of Transportation, written communication, December 11, 1995). The opening length of the structure parallel to the bridge face is 26 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 10 degrees to the opening while the computed opening-skew-toroadway is 5 degrees.A scour hole 3 ft deeper than the mean thalweg depth was observed along the right abutment during the Level I assessment. Scour countermeasures at the site included type-1 stone fill (less than 12 inches diameter) at the left and right upstream road embankments. Type-2 stone fill (less than 36 inches diameter) was along the upstream right bank and along the upstream right wingwall. Additional details describing conditions at the site are included in the Level II Summary and appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and Davis, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge was determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows was zero ft. Left abutment scour ranged from 2.4 to 3.2 ft. Right abutment scour ranged from 4.1 to 4.5 ft.The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and Davis, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Wild, Emily C.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure HUNTTH001007H on Town Highway 1 crossing the Cobb Brook, Huntington, Vermont (figures 1–10). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D.In August 1976, Hurricane Belle caused flooding at this site which resulted in road and bridge damage (figures 7-8). This was approximately a 25-year flood event (U.S. Department of Housing and Urban Development, 1978). The site is in the Green Mountain section of the New England physiographic province in central Vermont. The 4.20-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest upstream of the bridge. Downstream of the bridge is brushland and pasture.In the study area, the Cobb Brook has an incised, straight channel with a slope of approximately 0.03 ft/ft, an average channel top width of 43 ft and an average bank height of 6 ft. The channel bed material ranges from sand to boulders with a median grain size (D50) of 65.5 mm (0.215 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 24, 1996, indicated that the reach was stable. The Town Highway 1 crossing of the Cobb Brook is a 23-ft-long, two-lane bridge consisting of one 20-foot concrete slab span (Vermont Agency of Transportation, written communication, June 21, 1996). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 15 degrees to the opening while the opening-skew-to-roadway is zero degrees.A scour hole 2.8 ft deeper than the mean thalweg depth was observed along the left abutment during the Level I assessment. Protection measures at the site include type-1 stone fill (less than 12 inches diameter) at the downstream right wingwall, type-2 stone fill (less than 36 inches diameter) at the upstream right wingwall and the downstream end of the downstream left wingwall, and type-3 stone fill (less than 48 inches diameter) at the upstream left wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E.Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows.Contraction scour for all modelled flows ranged from 0.2 to 1.3 ft. The worst-case contraction scour occurred at the incipient-overtopping discharge. Abutment scour ranged from 4.0 to 8.7 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 10. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution.It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Boehmler, Erick M.; Degnan, James R.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure ROCKTH00390041 on Town Highway 39 crossing the Saxtons River, Rockingham, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in southeastern Vermont. The 57.4-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover consists of forest on the left bank and pasture with some trees on the right bank. In the study area, the Saxtons River has an sinuous channel with a slope of approximately 0.009 ft/ft, an average channel top width of 112 ft and an average bank height of 10 ft. The channel bed material ranges from sand to cobbles with a median grain size (D50) of 103 mm (0.339 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 15, 1996, indicated that the reach was laterally unstable. There are wide point bars, cut-banks with fallen trees, and areas of localized channel scour along the left bank, where there is bedrock exposure at the surface. The Town Highway 39 crossing of the Saxtons River is an 85-ft-long, one-lane bridge consisting of one 82-foot steel-beam span (Vermont Agency of Transportation, written communication, March 31, 1995). The bridge is supported by vertical, concrete abutments without wingwalls. The channel is skewed approximately 30 degrees to the opening while the opening-skew-to-roadway is zero degrees. A scour hole 3 ft deeper than the mean thalweg depth was observed during the Level I assessment along the left side of the channel under the bridge exposing the left abutment footing 5.5 feet. The only scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) on the left banks upstream and downstream and the left abutment wall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 2.2 to 3.8 feet. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 21.4 to 23.2 feet and 26.2 to 32.4 feet at the left and right abutments respectively. The worst-case abutment scour occurred for the right abutment at the incipient overtopping discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Bedrock was exposed at the surface in some areas of the channel and potentially is located at a shallower depth than the scour depths indicated above. Nevertheless, scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Burns, Ronda L.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure NFIETH00960068 on Town Highway 96 crossing the Dog River, Northfield, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in central Vermont. The 30.7-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover on the left bank upstream and downstream is pasture while the immediate banks have dense woody vegetation. The right bank upstream is forested and the downstream right bank is pasture. Vermont state route 12A runs parallel to the river on the right bank. In the study area, the Dog River has an incised, straight channel with a slope of approximately 0.004 ft/ft, an average channel top width of 70 ft and an average bank height of 7 ft. The channel bed material ranges from sand to cobble with a median grain size (D50) of 47.9 mm (0.157 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 25, 1996, indicated that the reach was stable. The Town Highway 96 crossing of the Dog River is a 45-ft-long, one-lane bridge consisting of one 43-foot steel-beam span with a timber deck (Vermont Agency of Transportation, written communication, October 13, 1995). The opening length of the structure parallel to the bridge face is 41.5 ft.The bridge is supported by vertical, concrete abutments with wingwalls. The channel is not skewed to the opening and the opening-skew-to-roadway is zero degrees. Channel scour 0.5 ft deeper than the mean thalweg depth, was observed under the bridge during the Level I assessment. The scour protection measures at the site included type-1 stone fill (less than 12 inches diameter) along the left bank upstream and type-2 stone fill (less than 36 inches diameter) along the upstream and downstream right banks that extends partially in front of the right wingwalls. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.8 to 1.2 ft. The worst-case contraction scour occurred at the 100-year and 500-year discharges. Abutment scour ranged from 8.5 to 12.2 ft. The worst-case abutment scour occurred at the incipient roadway-overtopping discharge for the right abutment. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Ivanoff, Michael A.; Burns, Ronda L.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure ANDOVT00110040 on State Route 11 crossing Lyman Brook, Andover, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in south-central Vermont. The 4.18-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture while the immediate banks have dense woody vegetation. In the study area, Lyman Brook has an incised, straight channel with a slope of approximately 0.03 ft/ft, an average channel top width of 42 ft and an average bank height of 8 ft. The channel bed material ranges from gravel to boulder with a median grain size (D50) of 86.0 mm (0.282 ft). The geomorphic assessment at the time of the Level I and Level II site visit on September 9, 1996, indicated that the reach was stable. The State Route 11 crossing of Lyman Brook is a 28-ft-long, two-lane bridge consisting of one 27-foot concrete tee-beam span (Vermont Agency of Transportation, written communication, March 29, 1995). The opening length of the structure parallel to the bridge face is 24.8 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 0 degrees to the opening while the opening-skew-to-roadway is 30 degrees. The scour protection measures at the site included type-2 stone fill (less than 36 inches diameter) at the upstream end of the upstream right wingwall and the downstream ends of the downstream left and right wingwalls. There was also a stone wall along the top of the left bank from 36 to 76 feet upstream. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.7 ft. The worst-case contraction scour occurred at the incipient-overtopping discharge which was more than the 100-year discharge. Left abutment scour ranged from 1.2 to 7.5 ft. The worst-case left abutment scour occurred at the 500-year discharge. Right abutment scour ranged from 5.2 to 6.7 ft. The worst-case right abutment scour occurred at the 100-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Burns, Ronda L.; Medalie, Laura
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure RIPTTH00180017 on Town Highway 18 crossing the South Branch Middlebury River, Ripton, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in west-central Vermont. The 15.5-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest except on the upstream left bank where it is shrubs and brush. In the study area, the South Branch Middlebury River has an incised, sinuous channel with a slope of approximately 0.03 ft/ft, an average channel top width of 86 ft and an average bank height of 10 ft. The channel bed material ranges from gravel to boulders with a median grain size (D50) of 111 mm (0.364 ft). In addition, there is a bedrock outcrop across the channel downstream of the bridge. The geomorphic assessment at the time of the Level I and Level II site visit on June 10, 1996, indicated that the reach was stable. The Town Highway 18 crossing of the South Branch Middlebury River is a 61-ft-long, one-lane bridge consisting of one 58-foot steel-beam span (Vermont Agency of Transportation, written communication, November 30, 1995). The opening length of the structure parallel to the bridge face is 56.8 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 40 degrees to the opening while the computed opening-skew-to-roadway is 30. A scour hole 1.25 ft deeper than the mean thalweg depth was observed along the right abutment and the downstream right wingwall during the Level I assessment. The scour protection measures at the site include type-2 stone fill (less than 36 inches diameter) along the left abutment and it’s wingwalls and at the upstream end of the right abutment. Also, type-3 stone fill (less than 48 inches diameter) is along the upstream right wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.1 to 1.1 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 5.6 to 9.0 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Boehmler, Erick M.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure BRISTH00270020 on Town Highway 27 crossing Little Notch Brook, Bristol, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in west-central Vermont. The 8.43-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover consists of pasture with trees, shrubs, and brush along the road embankments and the stream banks, except for the downstream left overbank area. Surface cover on the downstream left overbank is forest with dense undergrowth consisting of vines, shrubs, and brush. In the study area, Little Notch Brook has a sinuous channel with a slope of approximately 0.006 ft/ft, an average channel top width of 47 feet and an average bank height of 3 feet. The predominant channel bed materials are gravel and cobbles with a median grain size (D50) of 66.0 mm (0.216 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 19, 1995, indicated that the reach was stable. The Town Highway 27 crossing of Little Notch Brook is a 48-ft-long, one-lane bridge consisting of one 45-foot steel pony-truss span (Vermont Agency of Transportation, written communication, November 30, 1995). The opening length of the structure parallel to the bridge face is 42.8 feet. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 15 degrees to the opening while the opening-skew-to-roadway is zero degrees. A scour hole 1.0 feet deeper than the mean thalweg depth was observed along the upstream left wingwall and the upstream end of the left abutment during the Level I assessment. The only scour protection measure at the site was a crude, block-cut stone wall, which extended from the upstream end of the upstream left wingwall to 45 feet upstream. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.2 feet. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 12.2 to 13.4 feet at the left abutment and from 3.6 to 5.0 feet at the right abutment. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Boehmler, Erick M.; Wild, Emily C.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure ROCHVT01000144 on State Route 100 crossing the White River, Rochester, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in central Vermont. The 68.9-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture with forest on the valley walls. In the study area, the White River has a meandering channel with a slope of approximately 0.003 ft/ft, an average channel top width of 119 ft and an average channel depth of 4 ft. The predominant channel bed material is gravel and cobbles with a median grain size (D50) of 72.5 mm (0.238 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 22, 1996, indicated that the reach was laterally unstable due to a cut-bank present on the upstream left bank and wide point bars upstream and downstream in the vicinity of this site. The State Route 100 crossing of the White Riveris a 103-ft-long, two-lane bridge consisting of one 101-foot steel-beam span (Vermont Agency of Transportation, written communication, March 8, 1995). The bridge is supported by vertical, concrete abutment walls with spill-through embankments in front of each abutment wall and no wingwalls. The channel is skewed approximately 10 degrees to the opening while the opening-skew-toroadway is 5 degrees. The scour protection measures at the site are type-2 stone fill (less than 36 inches diameter) on the upstream left bank, both abutment spill-through embankments, and the downstream banks. There also is type-1 stone fill (less than 12 inches diameter) on the upstream right bank. The stone fill is continuous on both sides of the river in the vicinity of the bridge. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. There was no computed contraction scour for the modelled flows. Abutment scour ranged from 6.9 to 10.9 ft. The worst-case abutment scour occurred at the incipient overtopping discharge, which was less than the 100-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particlesize distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Ivanoff, Michael A.; Hammond, Robert E.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure CHESVT01030016 on State Route 103 crossing the Williams River, Chester, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in southeastern Vermont. The 15.1-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture except for the downstream right overbank which is forested. In the study area, the Williams River has an incised, straight channel with a slope of approximately 0.008 ft/ft, an average channel top width of 56 ft and an average bank height of 6 ft. The channel bed material ranges from gravel to cobbles with a median grain size (D50) of 67.5 mm (0.222 ft). The geomorphic assessment at the time of the Level I and Level II site visit on September 16, 1996, indicated that the reach was stable. The State Route 103 crossing of the Williams River is a 162-ft-long, two-lane bridge consisting of three steel-beam spans (Vermont Agency of Transportation, written communication, March 13, 1995). The opening length of the structure parallel to the bridge face is 157.7 ft.The bridge is supported by vertical, concrete abutments and piers with no wingwalls. The channel is skewed approximately 55 degrees to the opening while the opening-skew-to-roadway is also 55 degrees. The scour protection measures at the site included type-4 stone fill (less than 60 inches diameter) along the upstream left bank. There was type-3 stone fill (less than 48 inches diameter) along the upstream right bank and both spill-through embankments and both downstream banks. There was type-1 stone fill (less than 12 inches diameter) along the upstream right and downstream left road embankments. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows was 0.0. Abutment scour ranged from 6.4 to 9.0 ft. The worst-case abutment scour occurred at the 500-year discharge. Pier scour ranged from 7.9 to 10.1 ft. The worst-case pier scour occurred at the incipient-overtopping discharge for both piers. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Wild, Emily C.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure JERITH00350031 on Town Highway 35 crossing Mill Brook, Jericho, Vermont (figures 1– 8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gathered from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province and the Champlain section of the St. Lawrence physiographic province in northwestern Vermont. The 15.7-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest upstream of the bridge. The downstream left overbank is pasture. The downstream right overbank is brushland. In the study area, the Mill Brook has an incised, sinuous channel with a slope of approximately 0.02 ft/ft, an average channel top width of 117 ft and an average bank height of 11 ft. The channel bed material ranges from gravel to boulders with a median grain size (D50) of 81.1 mm (0.266 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 3, 1996, indicated that the reach was laterally unstable. The Town Highway 35 crossing of the Mill Brook is a 53-ft-long, one-lane bridge consisting of a 50-foot steel-beam span with a wooden deck (Vermont Agency of Transportation, written communication, November 30, 1995). The opening length of the structure parallel to the bridge face is 48 ft. The bridge is supported by a vertical, concrete abutment with wingwalls on the left. On the right, the abutment and wingwalls are laid-up stone with a concrete cap. The channel is not skewed to the opening. The roadway is skewed 10 degrees to the opening. A scour hole 1.5 ft deeper than the mean thalweg depth was observed along the left abutment during the Level I assessment. Scour countermeasures at the site were type-2 stone fill (less than 36 inches diameter) at the upstream and downstream left wingwalls, the upstream and downsteam left channel banks, and the downstream left road embankment. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). In addition, the incipient roadway-overtopping discharge is analyzed since it has the potential of being the worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.4 to 1.3 ft. The worst-case contraction scour occurred at the 500-year discharge. Left abutment scour ranged from 9.9 to 12.4 ft. Right abutment scour ranged from 13.8 to 17.8 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Striker, Lora K.; Medalie, Laura
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure MAIDTH00070004 on Town Highway 7 crossing the Cutler Mill Brook, Maidstone, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the White Mountain section of the New England physiographic province in northeastern Vermont. The 18.1-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is predominantly shrub and brushland. In the study area, the Cutler Mill Brook has a non-incised, meandering channel with local braiding and a slope of approximately 0.004 ft/ft, an average channel top width of 43 ft and an average bank height of 2 ft. The channel bed material ranges from sand to cobble with a median grain size (D50) of 27.6 mm (0.091 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 19, 1995, indicated that the reach was laterally unstable due to large meanders in the channel. The Town Highway 7 crossing of the Cutler Mill Brook is a 25-ft-long, one-lane bridge consisting of one 22-foot concrete span (Vermont Agency of Transportation, written communication, August 5, 1994). The opening length of the structure parallel to the bridge face is 21.7 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 20 degrees to the opening while the opening-skew-to-roadway is 0 degrees. A scour hole 2.0 ft deeper than the mean thalweg depth was observed along the left abutment during the Level I assessment. The only scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) along both banks upstream, along the entire base length of the upstream left wingwall, and along the upstream end of the upstream right wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge was determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 2.2 to 4.2 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 5.7 to 12.4 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Striker, Lora K.; Flynn, Robert H.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure FAYSTH00010006 on Town Highway 1 crossing Shepard Brook, Fayston, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in central Vermont. The 16.6-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest. In the study area, Shepard Brook has an incised, sinuous channel with a slope of approximately 0.01 ft/ft, an average channel top width of 56 ft and an average bank height of 3 ft. The channel bed material ranges from sand to boulder with a median grain size (D50) of 72.6 mm (0.238 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 2, 1996, indicated that the reach was stable. The Town Highway 1 crossing of the Shepard Brook is a 42-ft-long, two-lane bridge consisting of one 40-foot concrete T-beam span (Vermont Agency of Transportation, written communication, October 13, 1995). The opening length of the structure parallel to the bridge face is 39.6 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 15 degrees to the opening while the calculated opening-skew-to-roadway is 30 degrees. Scour, 2.0 ft deeper than the mean thalweg depth, was observed along the right abutment during the Level I assessment. The left abutment is undermined along the base of the footing. In addition, 1.5 ft of scour was observed along the left abutment during the Level I assessment. The only scour protection measure at the site was type-1 stone fill (less than 12 inches diameter) along the left bank upstream and type-2 stone fill (less than 36 inches diameter) along the upstream end of the upstream right wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.9 to 3.9 ft. The worst-case contraction scour occurred at the 500-year. Abutment scour ranged from 11.1 to 17.2 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Olson, Scott A.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure MANCUS00070024 on U.S. Route 7 crossing Lye Brook, Manchester, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Taconic section of the New England physiographic province in southwestern Vermont. The 8.13-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the primary surface cover consists of brush and trees. In the study area, Lye Brook has an incised, sinuous channel with a slope of approximately 0.03 ft/ft, an average channel top width of 66 ft and an average bank height of 11 ft. The channel bed material ranges from gravel to boulder with a median grain size (D50) of 90.0 mm (0.295 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 6, 1996, indicated that the reach was stable. Although, the immediate reach is considered stable, upstream of the bridge the Lye Brook valley is very steep (0.05 ft/ft). Extreme events in a valley this steep may quickly reveal the instability of the channel. In the Flood Insurance Study for the Town of Manchester (Federal Emergency Management Agency, January, 1985), Lye Brook’s overbanks were described as “boulder strewn” after the August 1976 flood. The U.S. Route 7 crossing of Lye Brook is a 28-ft-long, two-lane bridge consisting of one 25-foot concrete span (Vermont Agency of Transportation, written communication, September 28, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 45 degrees to the opening while the opening-skew-to-roadway is 55 degrees. At the time of construction, the downstream channel was relocated (written communication, Dan Landry, VTAOT, January 2, 1997). A levee on the downstream right bank was also constructed and is protected by type-4 stone-fill (less than 60 inches diameter) extending from the bridge to more than 300 feet downstream. Type-2 stone fill (less than 36 inches diameter) covers the downstream right bank from the bridge to more than 300 feet downstream. Type-2 stone-fill also extends from the bridge to 220 feet upstream on both upstream banks. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is analyzed since it has the potential of being the worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 1.0 to 1.6 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour computations for the left abutment ranged from 14.5 to 16.1 ft. with the worst-case occurring at the 100-year discharge. Abutment scour computations for the right abutment ranged from 6.9 to 10.4 ft. with the worst-case occurring at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Ivanoff, Michael A.; Hammond, Robert E.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure CHESVT00110044 on State Route 11 crossing Andover Brook, Chester, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in southeastern Vermont. The 12.6-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture with dense woody vegetation on the immediate banks except the downstream left bank of the bridge which is forested. In the study area, Andover Brook has an incised, meandering channel with a slope of approximately 0.02 ft/ft, an average channel top width of 74 ft and an average bank height of 8 ft. The channel bed material ranges from gravel to boulder with a median grain size (D50) of 83.6 mm (0.274 ft). The geomorphic assessment at the time of the Level I and Level II site visit on September 11, 1996, indicated that the reach was stable. The State Route 11 crossing of Andover Brook is a 58-ft-long, two-lane bridge consisting of one 56-foot concrete T-beam span (Vermont Agency of Transportation, written communication, March 29, 1995). The opening length of the structure parallel to the bridge face is 52.9 ft.The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 35 degrees to the opening while the opening-skew-to-roadway is 45 degrees. A scour hole 1.8 ft deeper than the mean thalweg depth was observed along the upstream left wingwall and left abutment during the Level I assessment. The scour protection measures at the site included type-4 stone fill (less than 60 inches diameter) along the upstream left bank between the wingwall and a concrete wall. There was type-2 stone fill (less than 36 inches diameter) along the entire base of the upstream left wingwall, and the downstream end of the downstream right wingwall. There was type-1 stone fill (less than 12 inches diameter) at the downstream end of the downstream left wingwall. There was also a concrete wall along the upstream left bank from 18 to 50 ft upstream of the bridge. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 1.2 ft. The worst-case contraction scour occurred at the incipient-overtopping discharge. The incipientovertopping discharge is 520 cfs less than the 100-year discharge. Left abutment scour ranged from 16.4 to 20.9 ft. The worst-case left abutment scour occurred at the 500-year discharge. Right abutment scour ranged from 8.4 to 9.4 ft. The worst-case right abutment scour occurred at both the 100-year and 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Wild, Emily C.; Degnan, James R.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure WOLCTH00130023 on Town Highway 13 crossing the Wild Branch Lamoille River, Wolcott, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, collected from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in northcentral Vermont. The 27.7-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture on the upstream right overbank. The upstream left overbank is brushland. Downstream of the bridge, the surface cover is forested on the right overbank. The downstream left overbank is pasture while the immediate bank has dense woody vegetation. In the study area, the Wild Branch Lamoille River has an incised, straight channel with a slope of approximately 0.009 ft/ft, an average channel top width of 65 ft and an average bank height of 7 ft. The channel bed material ranges from sand to boulders with a median grain size (D50) of 85.3 mm (0.280 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 17, 1996 indicated that the reach was laterally unstable. The Town Highway 13 crossing of the Wild Branch Lamoille River is a 41-ft-long, one-lane bridge consisting of a 39-foot steel girder span (Vermont Agency of Transportation, written communication, October 13, 1995). The opening length of the structure parallel to the bridge face is 38 ft. The bridge is supported by vertical, concrete abutments. The right abutment has concrete wingwalls. The channel is skewed approximately 45 degrees to the opening while the opening-skew-to-roadway is zero degrees. A scour hole 3.5 ft deeper than the mean thalweg depth was observed in the channel during the Level I assessment. Scour countermeasures at the site includes type-2 stone fill (less than 3 feet diameter) along the banks, the right wingwalls, the right abutment and the road embankments. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 1.0 to 2.1 ft. The worst-case contraction scour occurred at the 100-year discharge. Left abutment scour ranged from 9.1 to 13.2 ft. Right abutment scour ranged from 15.7 to 22.3 ft. The worst-case abutment scour occurred at the 500- year discharge for both abutments. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. During the August 1995 flood, the Wild Branch Lamoille River overtopped the bridge deck at structure WOLCTH00130023. Debris also was caught in the upstream I-beam of the structure. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Wild, Emily C.; Hammond, Robert E.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure ANDOVT00110041 on State Route 11 crossing the Middle Branch Williams River, Andover, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in southeastern Vermont. The 12.1-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is grass on the upstream right overbank while the immediate banks have dense woody vegetation. The upstream left overbank and downstream right overbank are brushland. The downstream left overbank is forested. In the study area, the Middle Branch Williams River has an incised, sinuous channel with a slope of approximately 0.018 ft/ft, an average channel top width of 71 ft and an average bank height of 4 ft. The channel bed material ranges from gravel to boulders with a median grain size (D50) of 85.0 mm (0.279 ft). The geomorphic assessment at the time of the Level I and Level II site visit on September 10, 1996, indicated that the reach was laterally unstable due to a cut-bank present on the upstream right bank and a wide channel bar with vegetation in the upstream reach. The State Route 11 crossing of the Middle Branch Williams River is a 46-ft-long, two-lane bridge consisting of a concrete 44-foot tee-beam span (Vermont Agency of Transportation, written communication, March 29, 1995). The opening length of the structure parallel to the bridge face is 42 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 35 degrees to the opening while the opening-skew-toroadway is zero degrees. A scour hole 0.8 ft deeper than the mean thalweg depth was observed along the downstream end of the left abutment and downstream left wingwall during the Level I assessment. Type- 2 stone fill (less than 36 inches diameter) protects the upstream end of the upstream left wingwall, the downstream ends of the downstream left and right wingwalls and the downstream right road embankment. Type-3 stone fill protects the upstream end of the upstream right wingwall and the upstream right bank. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). In addition, the incipient roadway-overtopping discharge was determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 2.1 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 11.1 to 18.7 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Wild, E.C.; Severance, Timothy
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure TUNBTH00450033 on Town Highway 45 crossing the First Branch White River, Tunbridge, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in central Vermont. The 86.4-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture upstream and downstream of the bridge, while woody vegetation sparsely covers the immediate banks. In the study area, the First Branch White River has an incised, sinuous channel with a slope of approximately 0.003 ft/ft, an average channel top width of 68 ft and an average bank height of 7 ft. The channel bed material ranges from sand to gravel with a median grain size (D50) of 27.1 mm (0.089 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 18, 1995, indicated that the reach was laterally unstable due to a cut-bank present on the upstream right bank and a wide channel bar in the upstream reach. The Town Highway 45 crossing of the First Branch White River is a 67-ft-long, one-lane bridge consisting of one 54-foot timber thru-truss span (Vermont Agency of Transportation, written communication, March 23, 1995). The opening length of the structure parallel to the bridge face is 53.5 ft. The bridge is supported on the right by a vertical, concrete abutment with an upstream wingwall, and on the left by a vertical, stone abutment. The channel is skewed approximately 20 degrees to the opening while the computed opening-skew-to-roadway is 10 degrees. A scour hole 1.5 ft deeper than the mean thalweg depth was observed along the right abutment during the Level I assessment. Scour countermeasures at the site include type-1 stone fill (less than 12 inches diameter) along the upstream right wingwall, type-2 stone fill (less than 36 inches diameter) along the right abutment, and type-3 stone fill (less than 48 inches diameter) along the upstream right bank. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge was determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 3.0 ft. The worst-case contraction scour occurred at the 500-year discharge. Left abutment scour ranged from 12.8 to 31.0 ft. Right abutment scour ranged from 9.8 to 19.0 ft. The worst-case left and right abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in Tables 1 and 2. A cross-section of the scour computed at the bridge is presented in Figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Wild, Emily C.
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure DORSTH00100029 on Town Highway 10 crossing the Mettawee River, Dorset, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Taconic section of the New England physiographic province in southwestern Vermont. The 9.5-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest on the upstream left overbank and the upstream and downstream right overbanks. The downstream left overbank is pasture and brushland. In the study area, the Mettawee River has an incised, sinuous channel with a slope of approximately 0.02 ft/ft, an average channel top width of 66 ft and an average bank height of 8 ft. The channel bed material ranges from gravel to boulders with a median grain size (D50) of 79.0 mm (0.259 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 5, 1996, indicated that the reach was stable. The Town Highway 10 crossing of the Mettawee River is a 26-ft-long, two-lane bridge consisting of a 24-ft steel-stringer span (Vermont Agency of Transportation, written communication, September 28, 1995). The opening length of the structure parallel to the bridge face is 24.1 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 45 degrees to the opening while the opening-skew-to-roadway is zero degrees. At the upstream end of the right abutment, there is a scour hole 1.0 ft deeper than the mean thalweg depth. Scour counter-measures at the site include type-1 stone fill (less than 12 inches diameter) along the downstream right wingwall. Type-2 stone fill (less than 36 inches diameter) is present along the downstream left and right banks. Type-3 stone fill (less than 48 inches diameter) is present along the upstream left bank and sparsely in front of the right abutment. A concrete wall (old abutment) extends along the upstream right bank. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.4 to 1.9 ft. The worst-case contraction scour occurred at the 500-year discharge. Left abutment scour ranged from 10.5 to 10.8 ft. The worst-case left abutment scour occurred at the 500-year discharge. Right abutment scour ranged from 11.4 to 11.9 ft. The worst-case right abutment scour occurred at the 100-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Burns, Ronda L.; Wild, Emily C.
1998-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure ANDOVT00110035 on State Route 11 crossing the Middle Branch Williams River, Andover, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (Federal Highway Administration, 1993). Results of a Level I scour investigation also are included in appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in appendix D. The site is in the Green Mountain section of the New England physiographic province in south-central Vermont. The 4.65-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest on the left bank and small trees and brush on the right bank upstream and downstream of the bridge. In the study area, the Middle Branch Williams River has an incised, meandering channel with a slope of approximately 0.02 ft/ft, an average channel top width of 57 ft and an average bank height of 4 ft. The channel bed material ranges from gravel to boulder with a median grain size (D50) of 31.4 mm (0.103 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 28, 1996, indicated that the reach was laterally unstable. There are cut-banks upstream and downstream of the bridge and an island in the channel upstream. The State Route 11 crossing of the Middle Branch Williams River is a 28-ft-long, two-lane bridge consisting of one 24-ft concrete tee-beam span (Vermont Agency of Transportation, written communication, March 28, 1995). The opening length of the structure parallel to the bridge face is 23.6 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 45 degrees to the opening while the computed opening-skew-to-roadway is 25 degrees. A scour hole ranging from 1.5 to 1.75 ft deeper than the mean thalweg depth was observed along the upstream left wingwall, the left abutment, and the downstream left wingwall during the Level I assessment. The scour countermeasures at the site included type-1 stone fill (less than 12 inches diameter) at the right road approach upstream and downstream of the bridge and type-2 stone fill (less than 36 inches diameter) at the left road approach upstream and downstream of the bridge. Additional details describing conditions at the site are included in the Level II Summary and appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and Davis, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge was determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 2.0 to 4.3 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 14.4 to 16.5 ft at the left abutment and from 6.3 to 8.8 ft at the right abutment. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and Davis, 1995, p. 46). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Wild, Emily C.; Burns, Ronda L.
1998-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure NEWHTH00200017 on Town Highway 20 crossing Little Otter Creek, New Haven, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in appendix D. The site is in the Champlain section of the St. Lawrence Valley physiographic province in west-central Vermont. The 10.8-mi2 drainage area is in a predominantly rural and wetland basin. In the vicinity of the study site, the surface cover is shrubland on the downstream right overbank. The surface cover of the downstream left overbank, the upstream right overbank and the upstream left overbank is wetland and pasture. In the study area, Little Otter Creek has a meandering channel with a slope of approximately 0.0007 ft/ft, an average channel top width of 97 ft and an average bank height of 5 ft. The channel bed material ranges from silt and clay to cobble. Medium sized silt and clay is the channel material upstream of the approach cross-section and downstream of the exit cross-section. The median grain size (D50) of the silt and clay channel bed material is 1.52 mm (0.005 ft), which was used for contraction and abutment scour computations. From the approach cross-section, under the bridge, and to the exit cross-section, stone fill is the channel bed material. The median grain size (D50) of the stone fill channel bed material is 95.7 mm (0.314 ft). The stone fill median grain size was used solely for armoring computations. The geomorphic assessment at the time of the Level I and Level II site visit on June 11, 1996, indicated that the reach was stable.The Town Highway 20 crossing of Little Otter Creek is a 32-ft-long, two-lane bridge consisting of a 28-ft steel-beam span (Vermont Agency of Transportation, written communication, December 15, 1995). The opening length of the structure parallel to the bridge face is 24.9 ft. The bridge is supported by almost vertical, concrete abutments. The channel is skewed approximately 15 degrees to the opening while the opening-skew-toroadway is zero degrees. The scour countermeasures at the site consisted of type-1 stone fill (less than 12 inches diameter) along the left and right abutments, as well as along the upstream left and right banks. Type-2 stone fill (less than 36 inches diameter) was present along the downstream right bank. Additional details describing conditions at the site are included in the Level II Summary and appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and Davis, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge was determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 9.7 to 13.8 ft. The worst-case contraction scour occurred at the 500-year discharge. Left abutment scour ranged from 6.9 to 7.9 ft. Right abutment scour ranged from 10.5 to 11.8 ft. The worst-case left and right abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and Davis, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Striker, Lora K.; Medalie, Laura
1997-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure GROTTH00480018 on Town Highway 48 crossing the Wells River, Groton, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in eastern Vermont. The 53.6-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture on the right bank upstream and the left bank downstream while the surface cover is shrub and brushland along the left bank upstream and the right bank downstream. The immediate banks are vegetated with brush and scattered trees. In the study area, the Wells River has an incised, straight channel with a slope of approximately 0.003 ft/ft, an average channel top width of 69 ft and an average bank height of 7 ft. The channel bed material ranges from sand to cobble with a median grain size (D50) of 66.7 mm (0.219 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 28, 1995, indicated that the reach was stable. The Town Highway 48 crossing of the Wells River is a 38-ft-long, one-lane bridge consisting of one 36-foot steel-beam span (Vermont Agency of Transportation, written communication, March 24, 1995). The opening length of the structure parallel to the bridge face is 33.7 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 0 degrees to the opening and the opening-skew-toroadway is also 0 degrees. Local scour 3.25 ft deeper than the mean thalweg depth was observed underneath the bridge along the left and right abutments during the Level I assessment. In addition, a scour hole extends from 90 ft US to 50 ft DS for a total length of 115 ft with an average scour depth of 2.0 ft. The only scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) along the left bank upstream, along the entire base length of the downstream right wingwall, and along the left and right banks downstream; and type-1 stone fill (less than 12 inches diameter) along the entire base length of the upstream left wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows was 0.0 ft. Abutment scour ranged from 2.0 to 2.3 ft at the left abutment and 8.8 to 14.6 ft at the right abutment. The worst-case abutment scour occurred at the 500-year discharge at the right abutment. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Boehmler, Erick M.; Wild, Emily C.
1998-01-01
This report provides the results of a detailed Level II analysis of scour potential at structure WWINTH00370034 on Town Highway 37 crossing Mill Brook, West Windsor, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (FHWA, 1993). Results of a Level I scour investigation also are included in appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in appendix D. The site is in the New England Upland section of the New England physiographic province in east-central Vermont. The 16.6-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture except for the upstream left bank where there is mostly shrubs and brush. In the study area, Mill Brook has a sinuous channel with a slope of approximately 0.003 ft/ ft, an average channel top width of 52 ft and an average bank height of 5 ft. The channel bed material ranges from sand to cobbles with a median grain size (D50) of 43.4 mm (0.142 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 5, 1996, indicated that the reach was laterally unstable. Point bars were observed upstream and downstream of this site. Furthermore, slip failure of the bank material was noted downstream at a cut-bank on the left side of the channel across from a point bar. The Town Highway 37 crossing of Mill Brook is a 37-ft-long, one-lane covered bridge consisting of one 32-foot wood thru-truss span (Vermont Agency of Transportation, written communication, March 23, 1995). The opening length of the structure parallel to the bridge face is 29.6 ft. The bridge is supported by vertical, laid-up stone abutment walls with concrete facing and laid-up stone wingwalls. The channel is skewed approximately 10 degrees to the opening while the opening-skew-to-roadway is zero degrees. A scour hole 1.5 ft deeper than the mean thalweg depth was observed along the right abutment during the Level I assessment. Scour protection measures at the site included type-3 (less than 48 inches diameter) and type-4 (less than 60 inches diameter) stone fill. Type-3 stone fill was observed along the upstream right bank and along the right abutments. Type-4 stone fill was observed at the upstream end of the upstream right wingwall. Additional details describing conditions at the site are included in the Level II Summary and appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and Davis, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge was determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. There was no contraction scour predicted for any of the modeled flows. Abutment scour at the left abutment ranged from 5.7 to 7.3 ft, while that at the right abutment ranged from 11.6 to 17.7 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results.” Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and Davis, 1995, p. 46). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.
Anderson, Scott W.; Keith, Mackenzie K.; Magirl, Christopher S.; Wallick, J. Rose; Mastin, Mark C.; Foreman, James R.
2017-08-03
On March 22, 2014, the State Route 530 Landslide near Oso, Washington mobilized 8 million cubic meters of unconsolidated Pleistocene material, creating a valley‑spanning deposit that fully impounded the North Fork Stillaguamish River. The river overtopped the 8-meter high debris impoundment within 25 hours and began steadily incising a new channel through the center of the deposit. Repeat topographic surveys, sediment transport measurements, bedload transport models, and observations of downstream channel change were used to document the establishment of that new channel through the landslide and assess the potential for downstream aggradation or channel change that might increase downstream flood hazards.Efficient erosion of the landslide deposit, associated with the steep knickzone formed by the downstream edge of the deposit, resulted in the re-establishment of a 20–40 meters wide, deeply inset channel through the entire deposit by May 2014, 2 months after the landslide. The mean water-surface elevation of the channel through the landslide decreased 7 meters during that 2-month period, and was about 1 meter above the pre-landslide profile in July 2014. The 2014–15 flood season, which included flows near the 0.5 annual exceedance probability discharge (2-year flood), widened the channel tens of meters, and further lowered the water-surface profile 0.5 meter. The planform position evolved slowly as a result of 5–20-meter high banks predominantly composed of clay-rich, cohesive lacustrine material. Erosion of the landslide deposit delivered a total of 820 thousand metric tons of sediment to the North Fork Stillaguamish River over the 18 months following the landslide. The sediment delivery from the deposit was predominantly fine grained: 77 percent (by mass) of the eroded material was silt or clay (less than 0.063 millimeter [mm]), 19 percent sand (0.063–2 mm), and 4 percent pebbles and cobbles (greater than 2 mm).Over the 18 months following the landslide, the bedload at a site 5 kilometers downstream of the landslide was estimated to be 310±65 thousand metric tons, and the suspended load at that same site was estimated to be 990±110 thousand metric tons. These loads represent the combined input from the landslide and ambient upstream sources; over the study interval, landslide sediment made up about 20–40 percent of the bedload, and 65–85 percent of the suspended-sediment load at this site. At a site 70 kilometers downstream of the landslide, near the mouth of the main‑stem Stillaguamish River, suspended sediment loads were estimated to be about 1,440 thousand metric tons, of which about 600 thousand metric tons, or 30 percent, likely was derived from the landslide. The mass of landslide sediment in suspension at the mouth of the river, and the timing of arrival of that sediment, indicates that about 70 percent of the landslide sediment eroded during the study period was quickly transported through the entire basin, exiting into Puget Sound within weeks of initial entrainment.Empirical bedload transport equations, in conjunction with surficial grain-size data and output from a one‑dimensional hydraulic model, were used to estimate spatial trends in bedload transport capacity, highlighting areas where reach-scale conditions would be most likely to promote deposition of coarse landslide sediment. Transport capacities decreased sharply over a reach about 5 kilometers downstream of the landslide and remained relatively low over the next 10 kilometers downstream. However, the magnitude of calculated transport capacities are large relative to the coarse sediment input from the landslide, suggesting that substantial deposition of landslide sediment was not likely to occur. These assessments were corroborated by observations of channel change, which indicated that the downstream channel response to the landslide was modest and short-lived. The most pronounced downstream effects included a wedge of aggradation just downstream of the landslide, about 1 meter high and extending a kilometer downstream, and a 0.3-meter pulse of aggradation observed 5 kilometers downstream of the landslide. In both locations, peak aggradation and channel response occurred within about a month of the landslide, and both sites had largely recovered to pre-landslide conditions by July 2014. No substantial channel change clearly linked to the landslide was observed after July 2014 except for a modest fining of surficial gravel size distributions and continued recovery and incision of the reach just downstream of the landslide.The muted downstream response of the North Fork Stillaguamish River to the State Route 530 Landslide primarily can be attributed to the cohesive, silt- and clay-rich material that bounded most of the new channel. Although the river efficiently incised a new channel through the deposit, subsequent rates of lateral erosion were slowed by the tall, cohesive banks, limiting the total volume of sediment delivery. Once entrained, however, most landslide material was rapidly transported downstream in suspension with little geomorphic effect. Landslide material coarse enough to travel as bedload was predominantly sand and fine gravel, and sediment transport models and observations of downstream change indicated that the rate of coarse sediment delivery from the landslide did not exceed the rivers ability to transport that material. The generally muted downstream response to sediment delivery from the State Route 530 Landslide, as well as the mechanics of that delivery and response, were generally consistent with observations made following the intentional removal of constructed dams.The rate and efficiency of erosion from the landslide decreased over the period of analysis, as the new channel approached a quasi-equilibrium form. In the absence of additional hillslope activity, rates of erosion from the landslide are likely to be small compared to those over the first 18 months after the landslide. The modest channel response to the highest rates of sediment delivery, and rapid recovery thereafter, indicate that the river should be able to convey the continued supply of landslide-derived sediment effectively with little effect on the downstream morphology and flood risks.