Science.gov

Sample records for package project final

  1. The OCCUPAC Project (A Project to Develop Occupational Information Learning Activity Packages for Grades K-9). Final Report.

    ERIC Educational Resources Information Center

    Peterson, Marla; And Others

    During Phase I of a two-phase project, 15 OCCUPACS (learning activity packages) were developed, pilot tested in a university laboratory school, field tested in four public school systems, revised, and submitted to professionals for final review. Intended to provide occupational information to children in Grades K-9 at different levels of…

  2. Evaluation of the Field Test of Project Information Packages: Volume I--Viability of Packaging. Final Report.

    ERIC Educational Resources Information Center

    Stearns, Marian S.

    The United States Office of Education (USOE) in 1973 commissioned the creation of Project Information Packages (PIPs) that could fulfill USOE's aims for a cost-effective mechanism for disseminating exemplary programs beyond their developers to school districts with less successful compensatory educational projects. Three volumes report the first…

  3. Evaluation of the Field Test of Project Information Packages: Volume I--Viability of Packaging. Final Report.

    ERIC Educational Resources Information Center

    Stearns, Marian S.

    The United States Office of Education (USOE) in 1973 commissioned the creation of Project Information Packages (PIPs) that could fulfill USOE's aims for a cost-effective mechanism for disseminating exemplary programs beyond their developers to school districts with less successful compensatory educational projects. Three volumes report the first…

  4. Project Information Packages Kit.

    ERIC Educational Resources Information Center

    RMC Research Corp., Mountain View, CA.

    Presented are an overview booklet, a project selection guide, and six Project Information Packages (PIPs) for six exemplary projects serving underachieving students in grades k through 9. The overview booklet outlines the PIP projects and includes a chart of major project features. A project selection guide reviews the PIP history, PIP contents,…

  5. Project Information Packages: Overview.

    ERIC Educational Resources Information Center

    RMC Research Corp., Mountain View, CA.

    This brochure describes a new series of Project Information Packages, a U.S. Office of Education response to the need for a systematic approach to disseminating exemplary projects. The packages describe procedures for developing the necessary administrative support and management framework, as well as instructional methods and techniques. The six…

  6. Summary strategy for compliance with postclosure requirements for the waste package for the Salt Repository Project: Final report

    SciTech Connect

    Not Available

    1988-03-01

    This document presents a summary of the strategy of the Salt Repository Project (SRP) to show compliance with the requirements for the waste package after permanent closure of the repository at the site in Deaf Smith County, Texas. The postclosure requirements that govern the performance of the waste package are those in 10 CFR 60.113 for substantially complete containment of the waste and for gradual release of radionuclides after the containment period, and for the postclosure design requirements in 10 CFR 60.135. Also, the waste package plays a role in showing compliance with the total system release requirement in 40 CFR 191.13. 12 refs.

  7. Technology Assessment Software Package: Final Report.

    ERIC Educational Resources Information Center

    Hutinger, Patricia L.

    This final report describes the Technology Assessment Software Package (TASP) Project, which produced developmentally appropriate technology assessment software for children from 18 months through 8 years of age who have moderate to severe disabilities that interfere with their interaction with people, objects, tasks, and events in their…

  8. Introduction to Software Packages. [Final Report.

    ERIC Educational Resources Information Center

    Frankel, Sheila, Ed.; And Others

    This document provides an introduction to applications computer software packages that support functional managers in government and encourages the use of such packages as an alternative to in-house development. A review of current application areas includes budget/project management, financial management/accounting, payroll, personnel,…

  9. Final Report Package_Winnebago

    SciTech Connect

    Carolyn Stewart, Director, Red Mountain Energy Partners

    2006-10-31

    The Winnebago Tribe of Nebraska energy options study results will be used to advance the Tribe’s near term energy management objectives. The array of energy options identified allows the Tribe to select those activities that best fit its energy strategies, goals and objectives. During the course of the study, Red Mountain analyzed both energy options and energy organizational alternatives suitable for the Tribe, presented findings to the Tribal Council, and made recommendations regarding each. Work products delivered to the Tribe, and provided in the Final Report included: • A matrix of energy management options applicable to the Tribe, which provided descriptions of particular conservation, efficiency, weatherization, and demand management alternatives. The matrix also provided insight about relative costs of the alternatives, cost/benefit efficacy, ease of implementation, resources for implementing, and observations about each. • A matrix of utility service options applicable to the Tribe, describing each of the four alternatives described above. The matrix also provided insight about key benefits of each option, required resources, costs and timeframe for implementation, funding sources and analysis, and key issues for consideration. • Discussion guides prepared for each meeting between the Energy Committee and Council, and the Tribe’s contractor, Red Mountain Energy Partners, which included preliminary analysis and findings. • A Position Description for the Energy Manager position, which was reviewed by the Tribal HR Department, and used by the Tribe to develop a position posting. • A Utility Code designed for Winnebago to use in establishing its Utility Board, and, ultimately, to provide guidance for the Board’s further development. • A project summary book developed to include all key information, deliverables and utility provider data for the project. Winnebago’s growth trends and expansion plans require the Tribe to play a more active

  10. Hermetic packaging for microwave modules. Final report

    SciTech Connect

    Hollar, D.L.

    1996-10-01

    Microwave assemblies, such as radar modules, require hermetically sealed packaging. Since most of these assemblies are used for airborne applications, the packages must be lightweight. The aluminum alloy A-40 provides the needed characteristics of these applications. This project developed packaging techniques using the A-40 alloy as a housing material and laser welding processes to install connectors, purge tube, and covers on the housings. The completed package successfully passed the hermetic leak requirements and environmental testing. Optimum laser welding parameters were established in addition to all of the related tooling for assembly.

  11. The Development of Project Information Packages for Effective Approaches in Compensatory Education. Final Report. Report No. UR-254.

    ERIC Educational Resources Information Center

    Tallmadge, G. Kasten

    The project described herein represents an attempt by the U. S. Office of Education to take a more active role in the national dissemination and replication of those programs which have achieved the greatest success in producing reliably measured achievement benefits in reading and mathematical skills. With this general objective in mind, the U.…

  12. Waste package/repository impact study: Final report

    SciTech Connect

    Not Available

    1985-09-01

    The Waste Package/Repository Impact Study was conducted to evaluate the feasibility of using the current reference salt waste package in the salt repository conceptual design. All elements of the repository that may impact waste package parameters, i.e., (size, weight, heat load) were evaluated. The repository elements considered included waste hoist feasibility, transporter and emplacement machine feasibility, subsurface entry dimensions, feasibility of emplacement configuration, and temperature limits. The evaluations are discussed in detail with supplemental technical data included in Appendices to this report, as appropriate. Results and conclusions of the evaluations are discussed in light of the acceptability of the current reference waste package as the basis for salt conceptual design. Finally, recommendations are made relative to the salt project position on the application of the reference waste package as a basis for future design activities. 31 refs., 11 figs., 11 tabs.

  13. Cross flow filter for AEPSC: TIDD slipstream HGCU project preliminary design package for Westinghouse cross flow filter system. Final submittal

    SciTech Connect

    Haldipur, G.B.; Lippert, T.E.

    1989-06-16

    The Westinghouse ceramic cross-flow filter element is constructed of multiple layers of thin, porous ceramic plates that contain ribs to form gas flow channels. Consecutive layers of the ceramic plates are oriented such that the channels of alternating plates are at an angle of 90 degrees (``cross flow``) to each other. The current size of a ceramic cross flow filter element is 12 in. {times} 12 in. {times} 14 in. Both sides of the short channels (4 in.) are exposed to the particle-laden coal gas. One end of the long (12 in.) channels is sealed while the other end of the long channel is mounted to the clean gas plenum. The particle-laden coal gas flows through the ``roof and floor`` of the porous ceramic plates that comprise the short, ``dirty side`` channels. The gas flows through the porous plates to the long, ``clean side`` channels. The gas flows through the porous plates to the long, ``clean side`` channels and finally to the clean gas plenum. The dust cake on the ``dirty side`` channels is periodically removed by applying a high-pressure reverse pulse of dry, clean gas through the clean gas plenum. For the TIDD plant filter slipstream, air will be utilized for filter cleaning.

  14. [The Waste Package Project. Final report, July 1, 1995--February 27, 1996]: Volume 3, Stress study in faulted tunnel models by combined photoelastic measurements and finite element analysis

    SciTech Connect

    Huang, Yuping

    1995-12-01

    The aim of this part of the Nuclear Waste Package Project research at UNLV is to investigate the stresses in a model of a faulted mountain and the effect of the fault on the stability of drifts in a proposed High Level Nuclear Waste Repository. An investigation was performed to develop a proper technique for analyzing the stresses in and around three adjacent scaled tunnel models, along with the stress concentration factors resulting from the existence of a fault that penetrates two of the three tunnels, at an inclined angel of 44{degrees} to the horizontal plane. The results and experience gained from this investigation will be used in a future project in which a full-size repository drift and a penetrating fault will be modeled and analyzed.

  15. Prometheus Project final report

    NASA Technical Reports Server (NTRS)

    Taylor, Randall

    2005-01-01

    This Final Report serves as an executive summary of the Prometheus Project's activities and deliverables from November 2002 through September 2005. It focuses on the challenges from a technical and management perspective, what was different and innovative about this project, and identifies the major options, decisions, and accomplishments of the Project team as a whole. However, the details of the activities performed by DOE NR and its contractors will be documented separately in accordance with closeout requirements of the DOE NR and consistent with agreements between NASA and NR.

  16. Prometheus Project final report

    NASA Technical Reports Server (NTRS)

    Taylor, Randall

    2005-01-01

    This Final Report serves as an executive summary of the Prometheus Project's activities and deliverables from November 2002 through September 2005. It focuses on the challenges from a technical and management perspective, what was different and innovative about this project, and identifies the major options, decisions, and accomplishments of the Project team as a whole. However, the details of the activities performed by DOE NR and its contractors will be documented separately in accordance with closeout requirements of the DOE NR and consistent with agreements between NASA and NR.

  17. Project Adobe. Final Report.

    ERIC Educational Resources Information Center

    Van Curen, Sallie A.

    This final report describes activities and accomplishments of Project Adobe, the New Mexico Parent Training and Information Center, which provides information, support, education and training to families with school-aged children with disabilities in their local communities. Achievements include: (1) completion and printing of a booklet on the…

  18. Packaging Materials Outgassing Study Final Report

    SciTech Connect

    Smith, R. A.

    2006-09-26

    An outgassing study was conducted on two polyurethane packaging foams, two polymer bottles (polytetrafluoroethylene and polyethylene), and two polymer lids. The purpose was to measure the volume of gases that diffuse from these packaging materials at a maximum of 400-degrees F when stored in ambient air within sealed containers.

  19. A Learning Package in Energy Conservation for Participants in the Home Building Industry. Final Report.

    ERIC Educational Resources Information Center

    Houston Univ., TX. College of Architecture.

    Presented is the final report for a project designed to develop an experimental learning package for educating participants in the home building industry in energy conservation. The project addresses deficiencies in the present knowledge status of members of the home building industry, effective marketing techniques for energy conserving homes,…

  20. Development of Home Health Aide Curriculum Project. Final Report.

    ERIC Educational Resources Information Center

    Brown, Patricia

    This package contains materials intended for use in a new home health aide curriculum that is designed to be presented as a two-quarter program at Tacoma Community College in Tacoma, Washington. Included in the package are a final report outlining the objectives and outcomes of the project to develop a home health aide curriculum that would meet…

  1. Development of Home Health Aide Curriculum Project. Final Report.

    ERIC Educational Resources Information Center

    Brown, Patricia

    This package contains materials intended for use in a new home health aide curriculum that is designed to be presented as a two-quarter program at Tacoma Community College in Tacoma, Washington. Included in the package are a final report outlining the objectives and outcomes of the project to develop a home health aide curriculum that would meet…

  2. Project BEST Final Report.

    ERIC Educational Resources Information Center

    Pankratz, David; Friedenberg, Joan

    Project BEST (Building Energy Systems Technology), a bilingual vocational training program, operated at Oakton Community College between March 1986 and September 1987. The purpose of the project was to provide 60 limited English proficient (LEP) Hispanic and Polish adults with sufficient vocational skills, English language skills, and appropriate…

  3. Project ACHIEVE final report

    SciTech Connect

    1997-06-13

    Project ACHIEVE was a math/science academic enhancement program aimed at first year high school Hispanic American students. Four high schools -- two in El Paso, Texas and two in Bakersfield, California -- participated in this Department of Energy-funded program during the spring and summer of 1996. Over 50 students, many of whom felt they were facing a nightmare future, were given the opportunity to work closely with personal computers and software, sophisticated calculators, and computer-based laboratories -- an experience which their regular academic curriculum did not provide. Math and science projects, exercises, and experiments were completed that emphasized independent and creative applications of scientific and mathematical theories to real world problems. The most important outcome was the exposure Project ACHIEVE provided to students concerning the college and technical-field career possibilities available to them.

  4. Project Final Report

    NASA Technical Reports Server (NTRS)

    Ciolkosz, Daniel; Albright, Louis

    1999-01-01

    The initial focus of this GSRP project was to model and develop systems for optimized use of the Microwave lamp for use in bioregenerative life support systems (BLSS). The microwave lamp, which has been developed for use in BLSS as part of a NASA small business innovation research (SBIR) grant, exhibits a number of characteristics that make it an excellent candidate for use in BLSS. However, we decided to shift the focus of the project, after discussions with scientists at KSC, to a broader question. Specifically, we decided to investigate the possibility of developing a decision tool for characterizing overall fighting system effectiveness in a plant growth system. It seemed pointless to optimize a microwave lamp for BLSS when there was no good way to decide what exactly an optimized system would look like. The problem is a complex one, involving multiple, conflicting objectives with irreconcilable units, significant constraints, and a wide range of relative importance among the objectives. The project would involve not only characterizing this complex decision process, but also would require some investigations into the physical properties of the lighting systems being considered. Thus, we turned to the field of Decision Modeling as a means of meeting this objective. After a thorough investigation of the literature, a technique was chosen and carefully developed. Implementation and analysis of the system are still in progress, and should be completed during the summer of 1999. Ancillary studies, which were conducted in the course of the project, have also been conducted, and are summarized below.

  5. Final Year Project Report

    SciTech Connect

    Hubsch, Tristan

    2013-06-20

    In the last years of this eighteen-year grant project, the research efforts have focused mostly on the study of off-shell representations of supersymmetry, both on the worldline and on the world- sheet, i.e., both in supersymmetric quantum mechanics and in supersymmetric field theory in 1+1-dimensional spacetime.

  6. Project ACORDE. Final Report.

    ERIC Educational Resources Information Center

    Kelley, Marjorie L.

    A report is presented on the evaluation and redevelopment of an 11-module course of instruction in restorative dentistry conducted under Project Acorde. The major learning goals for students were: acquisition of the necessary skills and knowledge of appropriate tools and materials; and self-appraisal of one's own work in performing the various…

  7. Partner Project. Final Report.

    ERIC Educational Resources Information Center

    Arizona Univ., Tucson. Dept. of Special Education.

    The study investigated the effectiveness of the Partner Project, a participation strategy on the participation of learning disabled high school students and their parents during the annual individualized education program (IEP) conference. Eleven students and their parents received the IEP participation strategy training which focused on…

  8. ACCESS Project: Final Report

    SciTech Connect

    Weller, Heiko

    2015-04-01

    The ACCESS project addressed the development, testing, and demonstration of the proposed advanced technologies and the associated emission and fuel economy improvement at an engine dynamometer and on a full-scale vehicle. Improve fuel economy by 25% with minimum performance penalties Achieve SULEV level emissions with gasoline Demonstrate multi-mode combustion engine management system

  9. Project ACORDE. Final Report.

    ERIC Educational Resources Information Center

    Kelley, Marjorie L.

    A report is presented on the evaluation and redevelopment of an 11-module course of instruction in restorative dentistry conducted under Project Acorde. The major learning goals for students were: acquisition of the necessary skills and knowledge of appropriate tools and materials; and self-appraisal of one's own work in performing the various…

  10. Final Project Report

    SciTech Connect

    Small, R. Justin; Bryan, Frank; Tribbia, Joseph; Park, Sungsu; Dennis, John; Saravanan, R.; Schneider, Niklas; Kwon, Young-Oh

    2015-06-01

    Most climate models are currently run with grid spacings of around 100km, which, with today’s computing power, allows for long (up to 1000 year) simulations, or ensembles of simulations to explore climate change and variability. However this grid spacing does not resolve important components of the weather/climate system such as atmospheric fronts and mesoscale systems, and ocean boundary currents and eddies. The overall aim of this project has been to look at the effect of these small-scale features on the weather/climate system using a suite of high and low resolution climate models, idealized models and observations. This project was only possible due to the highly scalable aspect of the CAM Spectral Element dynamical core, and the significant resources allocated at Yellowstone and NERSC for which we are grateful.

  11. Final Project Report

    SciTech Connect

    Bogucz, E A

    2010-12-13

    This project pursued innovations to improve energy efficiency and indoor environmental quality (IEQ) in commercial and residential buildings. For commercial buildings, the project developed a testbed for “intelligent nested environmental systems technologies (iNEST),” which monitor and control energy flows and IEQ across a cascade of spaces from individuals’ desktops to office suites to floors to whole buildings. An iNEST testbed was constructed at Syracuse University and was used to assess the use of devices such as personal badges and CO2 sensors to study how reduced energy use and improved IEQ could be achieved. For residential buildings, resources were targeted in support of DoE’s Builders Challenge Program and to recruit Syracuse, NY builders. Three homes in Syracuse’s Near Westside neighborhood were also registered under the program by Syracuse University team, with an additional home registered by one of the builders. Findings from the work at the iNEST testbed facility, and results from other related projects were disseminated through Syracuse Center of Excellence in Environmental and Energy Systems (SyracuseCoE) 2008 Annual Symposium, the 9th International Healthy Buildings 2009 Conference & Exhibition, and through SyracuseCoE’s website and eNewsletters to inform the broader community of researchers, designers and builders. These public communication activities helped enhance the understanding of high performance buildings and facilitate further market acceptance.

  12. Final project report

    SciTech Connect

    Nitin S. Baliga and Leroy Hood

    2008-11-12

    The proposed overarching goal for this project was the following: Data integration, simulation and visualization will facilitate metabolic and regulatory network prediction, exploration, and formulation of hypotheses. We stated three specific aims to achieve the overarching goal of this project: (1) Integration of multiple levels of information such as mRNA and protein levels, predicted protein-protein interactions/associations and gene function will enable construction of models describing environmental response and dynamic behavior. (2) Flexible tools for network inference will accelerate our understanding of biological systems. (3) Flexible exploration and queries of model hypotheses will provide focus and reveal novel dependencies. The underlying philosophy of these proposed aims is that an iterative cycle of experiments, experimental design, and verification will lead to a comprehensive and predictive model that will shed light on systems level mechanisms involved in responses elicited by living systems upon sensing a change in their environment. In the previous years report we demonstrated considerable progress in development of data standards, regulatory network inference and data visualization and exploration. We are pleased to report that several manuscripts describing these procedures have been published in top international peer reviewed journals including Genome Biology, PNAS, and Cell. The abstracts of these manuscripts are given and they summarize our accomplishments in this project.

  13. Final project report

    SciTech Connect

    Podzorov, Vitaly

    2012-10-28

    The scope of this project is to investigate fundamental aspects of self-assembled monolayers (SAMs) grown at the surface of organic semiconductors and other electronic materials, recently discovered in our group (Fig. 1) [1]. Understanding the growth mechanism and structure of these SAMs, as well as investigating the effect of SAM-induced high surface conductivity, are the main thrusts of the project. An additional thrust of the project is to find new ways of surface doping or surface gating of novel semiconductors, in which electronic traps at the interface would be passivated. Molecular self assembly is an exciting research area of modern materials science, playing an important role in a variety of emerging applications, such as organic and molecular electronics, bioengineering, sensors and actuators. The current effort in this field has been focused on two experimental platforms: SAMs on metals (e.g., Au) and SAMs on inorganic oxides (e.g., SiO2). We have recently discovered the third platform, molecular self-assembly at the surface of carbon-based electronic materials (organic semiconductors, graphene and CNTs), which opens new opportunities for fundamental research and applications (Fig. 1) [1, 2, 3]. One of the most intriguing aspects of the new discovery is that formation of an FTS self-assembled monolayer on these materials induces a high-density mobile charges, with n up to 1014 cm-2, resulting in a large surface conductivity, σ ≈ 10-5 S·square-1 [1]. The effect is due to an interfacial electron transfer from the semiconductor to the SAM, resulting in a 0.54 V potential drop across the 1.3 nm-thick SAM, as recently revealed by Kelvin probe microscopy in rubrene [4].

  14. [The Waste Package Project. Final report, July 1, 1995--February 27, 1996]: Volume 2, Experimental verification of structural response of a flexible three-link hydraulic steel robot

    SciTech Connect

    Channarayapatna, Shashidhar S.

    1996-01-01

    This report presents experimental techniques for determining the static and dynamic response, in three dimensional space, of a flexible three-link hydraulic steel robot. The flexible robot was originally built under a grant from the Army Research Office (ARO) and has been the subject of a six year research project involving 12 graduate students and four faculty members. The research was continued under grant from the U.S. Department of Energy which is considering the use of robot in remote handling, placement and retrievability of H.L.N.W. canisters in geological formations. A series of static and dynamic experiments was conducted under two different loads at various angular positions of the robot links.

  15. Final Project Report

    SciTech Connect

    Zhang, Jin; Zhao, Yiping

    2014-12-05

    In this entire project period from 2005-2014, we have made significant progress in developing novel nanostructures of metal oxides (MOs) for solar hydrogen generation based on photoelectrochemical (PEC). Materials investigated are focused on 1D and 0D MO nanostructures of TiO2, WO3, ZnO, and Fe2O3 in conjunction with quantum dot (QD) sensitization and chemical doping (N or H) to alter their electronic band structures for both visible light absorption and for facilitating interfacial charge transport. In addition, we have used plasmonic metal nanostructures to enhance the PEC performance by improving light absorption of QDs via enhanced scattering of the plamonic metal. Most importantly, we have discovered a multipronged strategy for improving PEC performance: using plasmonic metal nanostructure to enhance light absorption, QDs to improve charge transfer, and chemical doping to increase charge transport in metal oxides for PEC. The combination is critical for overall high efficiency of PEC. This strategy is developed and demonstrated for the first time to our best knowledge.

  16. The Thy Project. Final Report.

    ERIC Educational Resources Information Center

    Billimoria, Roshan R., Ed.

    Inspiried by a United Nations effort to establish a worldwide university, the four and one-half year project carried out in Thy (Denmark) is explained in this final report, from its historical beginnings in 1973 to its official completion in 1978. Dedicated to the solution of problems which could be considered universal, the project goals are…

  17. The Trine Project Final Report.

    ERIC Educational Resources Information Center

    Gunderson, Jon R.; And Others

    The final report describes the Trine Project which addressed three needs in the education of handicapped children: the need for an alternate writing system, the need for communication, and the need for access to general purpose computers used in the schools. The project had three major objectives: (1) to design a low-cost portable writing and…

  18. Final Project Report

    SciTech Connect

    Carrick M. Eggleston

    2003-12-12

    This report provides a description of the main accomplishments of the EMSP funded research, including products such as conference presentations and publications (including those still in preparation). The purpose of this study was to better understand the chemical interactions between dissolved aqueous contaminants and carbonate minerals occurring as coatings on mineral grains in the vadose zone beneath the Hanford reserve. This information is important for construction of improved reactive transport models intended to predict the subsurface migration of contaminants. We made improvements to the hydrothermal atomic force microscope (HAFM) design to be used in this project. The original HAFM was built with funding from the U.S. DOE, Office of Basic Energy Sciences. Improvements include operating limits of 70 bars and 170 C, from an original limit of 12 bars and 150 C. This product is patented. We completed a series of studies of magnesite, MgCO3, because this mineral is structurally equivalent to calcite but reacts much more slowly, allowing us to study carbonate reactivity under pH conditions (i.e., low pH) that are much more problematic for studies of calcite but which are nevertheless relevant to in-situ conditions. We found that dissolving magnesite exhibits a dramatic change in step orientation, and therefore etch pit shape, as pH is lowered through 4.2 to 3 and 2. This change in step orientation is NOT accompanied by an increase in step velocity with decreasing pH. We also found that, after growing magnesite on a magnesite substrate, the newly grown magnesite dissolved much more readily than the underlying substrate magnesite, and exhibited far larger etch pit densities. This effect may have been related to the rate of growth or to the presence of an Fe impurity in the growth solutions. We studied the dissolution of magnesite and calcite (104) surfaces under a wider variety of conditions with a new hydrodynamically defined hydro thermal AFM fluid cell, and we

  19. Final system instrumentation design package for Decade 80 solar house

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The final configuration of the Decade 80 solar house to monitor and collect system performance data is presented. A review demonstrated by actual operation that the system and the data acquisition subsystem operated satisfactorily and installation of instrumentation was in accordance with the design. This design package is made up of (1) site and system description, (2) operating and control modes, and (3) instrumentation program (including sensor schematic).

  20. Required warnings for cigarette packages and advertisements. Final rule.

    PubMed

    2011-06-22

    The Food and Drug Administration (FDA) is amending its regulations to add a new requirement for the display of health warnings on cigarette packages and in cigarette advertisements. This rule implements a provision of the Family Smoking Prevention and Tobacco Control Act (Tobacco Control Act) that requires FDA to issue regulations requiring color graphics, depicting the negative health consequences of smoking, to accompany the nine new textual warning statements required under the Tobacco Control Act. The Tobacco Control Act amends the Federal Cigarette Labeling and Advertising Act (FCLAA) to require each cigarette package and advertisement to bear one of nine new textual warning statements. This final rule specifies the color graphic images that must accompany each of the nine new textual warning statements.

  1. Rethink Disposable: Packaging Waste Source Reduction Pilot Project

    EPA Pesticide Factsheets

    Information about the SFBWQP Rethink Disposable: Packaging Waste Source Reduction Pilot Project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  2. TYPE A FISSILE PACKAGING FOR AIR TRANSPORT PROJECT OVERVIEW

    SciTech Connect

    Eberl, K.; Blanton, P.

    2013-10-11

    This paper presents the project status of the Model 9980, a new Type A fissile packaging for use in air transport. The Savannah River National Laboratory (SRNL) developed this new packaging to be a light weight (<150-lb), drum-style package and prepared a Safety Analysis for Packaging (SARP) for submission to the DOE/EM. The package design incorporates unique features and engineered materials specifically designed to minimize packaging weight and to be in compliance with 10CFR71 requirements. Prototypes were fabricated and tested to evaluate the design when subjected to Normal Conditions of Transport (NCT) and Hypothetical Accident Conditions (HAC). An overview of the design details, results of the regulatory testing, and lessons learned from the prototype fabrication for the 9980 will be presented.

  3. PRIDE Surveillance Projects Data Packaging Project Information Package Specification Version 1.1

    SciTech Connect

    Kelleher, D. M.; Shipp, R. L.; Mason, J. D.

    2010-08-31

    Information Package Specification version 1.1 describes an XML document format called an information package that can be used to store information in information management systems and other information archives. An information package consists of package information, the context required to understand and use that information, package metadata that describes the information, and XML signatures that protect the information. The information package described in this specification was designed to store Department of Energy (DOE) and National Nuclear Security Administration (NNSA) information and includes the metadata required for that information: a unique package identifier, information marking that conforms to DOE and NNSA requirements, and access control metadata. It is an implementation of the Open Archival Information System (OAIS) Reference Model archival information package tailored to meet NNSA information storage requirements and designed to be used in the computing environments at the Y-12 National Security Complex and at other NNSA sites.

  4. PRIDE Surveillance Projects Data Packaging Project, Information Package Specification Version 1.0

    SciTech Connect

    Kelleher, D.M.; Shipp, R. L.; Mason, J. D.

    2009-09-28

    This document contains a specification for a standard XML document format called an information package that can be used to store information and the context required to understand and use that information in information management systems and other types of information archives. An information package consists of packaged information, a set of information metadata that describes the packaged information, and an XML signature that protects the packaged information. The information package described in this specification was designed to be used to store Department of Energy (DOE) and National Nuclear Security Administration (NNSA) information and includes the metadata required for that information: a unique package identifier, information marking that conforms to DOE and NNSA requirements, and access control metadata. Information package metadata can also include information search terms, package history, and notes. Packaged information can be text content, binary content, and the contents of files and other containers. A single information package can contain multiple types of information. All content not in a text form compatible with XML must be in a text encoding such as base64. Package information is protected by a digital XML signature that can be used to determine whether the information has changed since it was signed and to identify the source of the information. This specification has been tested but has not been used to create production information packages. The authors expect that gaps and unclear requirements in this specification will be identified as this specification is used to create information packages and as information stored in information packages is used. The authors expect to issue revised versions of this specification as needed to address these issues.

  5. Community Family Day Care Project. Final Report.

    ERIC Educational Resources Information Center

    Pacific Oaks Coll., Pasadena, CA.

    The final six months of the Community Family Day Care Project are reported, together with a summary of the total project, recommendations for the future, and an analysis of the cost of replicating such a project. In the final six months of the project, the staff was concerned with building supports for the self-help organization Women Attentive to…

  6. Industrial Packaging Prevention and Reuse Project

    EPA Pesticide Factsheets

    Alameda County, California is an EPA Climate Showcase Community. EPA’s Climate Showcase Communities Program helps local governments and tribal nations pilot innovative, cost-effective and replicable community-based greenhouse gas reduction projects.

  7. Selecting Exemplary Compensatory Education Projects for Dissemination Via Project Information Packages. Report No. UR-242.

    ERIC Educational Resources Information Center

    Foat, Classie M.

    This report is the third technical report submitted to the U. S. Office of Education in connection with a study the overall purpose of which was to choose up to eight successful education programs serving underachieving, poor children and to design "Project Information Packages" for each of them. These Project Information Packages were to serve as…

  8. Project WORKSMART. A Final Report.

    ERIC Educational Resources Information Center

    NashvilleREAD, Nashville, TN.

    Project WORKSMART was a Nashville, Tennessee-based workplace literacy project to provide an exemplary multidimensional workplace literacy program while simultaneously demonstrating products and practices that promote lifelong learning that can be customized and replicated in diverse work environments. The project was a partnership between…

  9. N-STAR/IMAGE Project. Final report

    SciTech Connect

    Driver, R.K.

    1993-06-30

    This is the final report on the N*IMAGE project. It contains a brief abstract of the project background, objectives, efforts taken to achieve the objectives, and publications provided. The Soviet Union has devolved into various autonomous republics, each having individual nationalistic agendas, yet retaining many of the indigenous capabilities and facilities that were present prior to the dissolution of the USSR. Military forces, especially nuclear, still exist in spite of the changes in the overarching control hierarchy. The Commonwealth of Independent States [CIS] has been created, ostensibly maintaining control over the strategic forces of the now-defunct Soviet Union. These changes have created an identifiable need to understand the old forces in a new context. It is important to understand the political, social, and economic structures that bear on the new environment. Information on the individual republics and former Soviet Union is coming in at a staggering rate; it must be assimilated and analyzed while being careful not to lose those existing data points and analysis of Soviet information that are still relevant. The objective of the proposed FSRC work was to provide user-friendly, automated analytical tools to assist the analyst in assessing various aspects of Russia and CIS Nuclear Weapons. For each, the data package includes an extensive, free-form, interactive database system (N-STAR), a hierarchical structure of questions which lead an analyst through the essential elements of the related decisionmaking process (IMAGE), and an instruction manual explaining the use of the systems and their interrelationships. Relevant data su porting the analysis will be available in a standard format on the same system, facilitating data fusion and assessment. These analyst tools are in the form of Macintosh-compatible software systems (N-STAR and IMAGE) along with supporting documentation.

  10. Comprehensive Evaluation Project. Final Report.

    ERIC Educational Resources Information Center

    1969

    This project sought to develop a set of tests for the assessment of the basic literacy and occupational cognizance of pupils in those public elementary and secondary schools, including vocational schools, receiving services through Federally supported educational programs and projects. The assessment is to produce generalizable average scores for…

  11. Productivity Training Project Final Report.

    ERIC Educational Resources Information Center

    University of Southern Colorado, Pueblo.

    This report describes the Productivity Training Project (PTP), a partnership between the University of Southern Colorado and Latino Chamber of Commerce (LCC) of Pueblo. The project provided "new economy skills" training to employees of LCC member businesses and basic skills training to the unemployed or underemployed. The report explains…

  12. Project Management Plan 105-KE Basin sludge retrieval and packaging

    SciTech Connect

    McWethy, L.M.

    1994-11-07

    The KE Basin contains over 1,100 metric tons of spent nuclear fuel (SNF). The bulk of this inventory consists of over 50,000 zircaloy clad, uranium metal N-Reactor fuel element assemblies, along with less than half a metric ton of single-pass reactor fuel elements, stored in over 3,600 open top canister assemblies. In addition, sludge containing fissile and fission product material from damaged/degraded fuel has accumulated in the basin. The sludge, particularly the fines, impacts basin operations by clouding the water and making activities requiring a clear view impossible to complete until after sludge settles. Packaging would get the sludge out of the operator`s way and allow it to be moved within the basin in a more manageable state. The primary project objective is to develop, procure, and quality the equipment needed to remove all sludge from the KE Basin with minimal dose commitment, minimal cost, and on schedule. The project will provide: (1) the development, testing, and installation of equipment for sludge retrieval and packaging; (2) understanding of and experience with actual sludge through near-term sludge packaging feature tests in the KE Basin; (3) sludge removal and handling equipment required to support debris removal, fuel handling, and other activities involving sludge within the KE Basin; and (4) enlist industry expertise in all phases of the project. This Project Management Plant establishes the organizational responsibilities, control systems, and procedures for the execution of project activities for KE Basin sludge retrieval packaging, to meet programmatic requirements within authorized funding and approved schedules.

  13. Landfill gas project. Final report

    SciTech Connect

    1983-01-01

    The methane gas recovered from the landfill is used for space heating and water heating for the Florence-Lauderdale Humane Shelter 600 feet from the well head. The project to date and future development are described briefly. (MHR)

  14. MODEL 9975 LIFE EXTENSION PACKAGE 1 - FINAL REPORT

    SciTech Connect

    Daugherty, W.

    2011-03-04

    Life extension package LE1 (9975-03382) was instrumented and subjected to a temperature/humidity environment that bounds KAMS package storage conditions for 92 weeks. During this time, the maximum fiberboard temperature was {approx}180 F, and was established by a combination of internal heat (12 watts) and external heat ({approx}142 F). The relative humidity external to the package was maintained at 80 %RH. This package was removed from test in November 2010 after several degraded conditions were observed during a periodic examination. These conditions included degraded fiberboard (easily broken, bottom layer stuck to the drum), corrosion of the drum, and separation of the air shield from the upper fiberboard assembly. Several tests and parameters were used to characterize the package components. Results from these tests generally indicate agreement between this full-scale shipping package and small-scale laboratory tests on fiberboard and O-ring samples. These areas of agreement include the rate of fiberboard weight loss, change in fiberboard thermal conductivity, fiberboard compression strength, and O-ring compression set. In addition, this package provides an example of the extent to which moisture within the fiberboard can redistribute in the presence of a temperature gradient such as might be created by a 12 watt internal heat load. Much of the moisture near the fiberboard ID surface migrated towards the OD surface, but there was not a significant axial moisture gradient during most of the test duration. Only during the last inspection period (i.e. after 92 weeks exposure during the second phase) did enough moisture migrate to the bottom fiberboard layers to cause saturation. A side effect of moisture migration is the leaching of soluble compounds from the fiberboard. In particular, the corrosion observed on the drum appears related primarily to the leaching and concentration of chlorides. In most locations, this attack appears to be general corrosion, with

  15. Project Dakota Final Report: 1983-1986.

    ERIC Educational Resources Information Center

    Kovach, JoAnne; Kjerland, Linda

    This final report describes Project Dakota, an early intervention demonstration project serving newborns to preschoolers with developmental delay or disability in Dakota County, Minnesota, from 1983 to 1986. The first chapter describes the project model (which focuses on increasing the effectiveness of parents in fostering the child's development)…

  16. Green Schools Project Final Report

    SciTech Connect

    Verdict, M.

    2000-09-27

    The Alliance to Save Energy has responded to interest in the Green Schools concept from the New England states of Maine, New Hampshire and Vermont. The Alliance conducted a train-the-trainers workshop in Augusta, Maine March 17--18, 1999. This work is part of a Green Schools replication project leveraged by funds from another source, NORDAX, which contributed $80,000 to provide partial support to staff at the Maine Energy Education Project (MEEP), Vermont Energy Education Program (VEEP), and New Hampshire Governor's Office to develop Green Schools Projects. DOE funds were used to conduct training, develop a network of state and local government, business and school partners to support school efficiency activities in those three states.

  17. MODEL 9975 LIFE EXTENSION PACKAGE 2 FINAL REPORT

    SciTech Connect

    Daugherty, W.

    2010-04-27

    Life extension package LE2 (9975-04162) was instrumented and subjected to an extreme temperature environment for 81 weeks. During this time, the maximum fiberboard temperature was {approx}240 - 250 degrees F, and was established by a combination of internal heat (19 watts) and external heat. This temperature matches the fiberboard continuous service rating, although such extremes are not expected for normal operation in KAMS. Several tests and parameters were used to characterize the package components. Results from these tests generally indicate agreement between this full-scale shipping package and small-scale laboratory tests on fiberboard and O-ring samples. These areas of agreement include the rate of fiberboard weight loss, change in fiberboard thermal conductivity, fiberboard compression strength, and O-ring compression set. In addition, this package provides an example of the extent to which moisture within the fiberboard can redistribute in the presence of a temperature gradient such as might be created by a 19 watt internal heat load. Moisture re distribution in this package was further exaggerated by a majority of the fiberboard being heated to above the boiling point of water. The majority of water within the fiberboard migrated to the bottom layers of fiberboard, where it contributed to accelerated degradation beyond that expected based solely on the temperature.

  18. Competitive Skills Project. Final Report.

    ERIC Educational Resources Information Center

    El Camino Coll., Torrance, CA.

    Almost 180 (22.5 percent) of BP Chemicals/HITCO, Inc. (BPCHI) employees have participated in the basic skills courses offered through the Competitive Skills Project (CSP) at El Camino College (Torrance, California). Workplace basics provide a solid foundation for Total Quality Management (TQM), enabling workers to be globally competitive. Two main…

  19. Project Winamac. Final Performance Report.

    ERIC Educational Resources Information Center

    El-Tip-Wa Adult Learning Center, Logansport, IN.

    A workplace literacy partnership project was conducted to upgrade the basic skills and productivity of 287 hourly wage earners of Winamac Spring Company (WSC) in Indiana. WSC paid employee wages for up to 24 hours of training and provided a classroom facility. El-Tip-Wa Adult Learning Center instructional staff provided basic skills training using…

  20. The ELEXTEC Project. Final Report.

    ERIC Educational Resources Information Center

    Chapman, George L.

    The ELEXTEC project was initiated to provide better technical education to students enrolled in electronics technology. It was designed to convert a set of materials developed by the U.S. Air Force for teaching electronic principles in a form which could be utilized by civilian technical education institutions. Fourteen colleges participated in…

  1. Project Open Door. Final Report.

    ERIC Educational Resources Information Center

    Verheyden-Hilliard, Mary Ellen

    The major purpose of Project Open Door was to design, develop, test, and disseminate a portable module for vocational educators and others to use with junior high school students in pre-vocational exploration free of sex stereotyping. The module produced contained a slide presentation with accompanying cassette tape and a leader's guide. An…

  2. Serials Cancellation Project. Final Report.

    ERIC Educational Resources Information Center

    Carter, Ruth C.; Bruntjen, Scott

    A serials cancellation pilot project was conducted by the Pittsburgh Regional Library Center (PRLC) from August 1981 to December 1983 in order to demonstrate the utility of using a large online union list of serials for making and reporting collection management decisions. A total of 21 academic libraries and one public library from Pennsylvania,…

  3. The MUST Project. Final Report.

    ERIC Educational Resources Information Center

    Atlanta Public Schools, GA.

    Described are planning and operational phases of the Media Utilization Services for Teachers (MUST) Project, an effort to utilize media to individualize and improve instruction for educable mentally retarded (EMR) elementary school students. Aspects of the planning period (1969-70) treated include staffing and orientation procedures, limitation of…

  4. Project HEED. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Hughes, Orval D.

    During 1972-73, Project HEED (Heed Ethnic Educational Depolarization) involved 1,350 Indian students in 60 classrooms at Sells, Topowa, San Carlos, Rice, Many Farms, Hotevilla, Peach Springs, and Sacaton. Primary objectives were: (1) improvement in reading skills, (2) development of cultural awareness, and (3) providing for the Special Education…

  5. The Compact Project: Final Report.

    ERIC Educational Resources Information Center

    National Alliance of Business, Inc., Washington, DC.

    The National Alliance of Business (NAB) surveyed the 12 sites that participated in the Compact Project to develop and implement programs of business-education collaboration. NAB studied start-up activities, key players, conditions for collaboration, accomplishments, challenges, and future plans. Program outcomes indicated that building successful…

  6. Anthropometric Training Project. Final Report.

    ERIC Educational Resources Information Center

    San Diego State Coll., CA.

    The Anthropometric Training Project was aimed at providing a training program for select students to develop research competency in an area relating body type, composition, anthropometric assessment, and physical performance measures. The program involves interdisciplinary cooperation in training through seminars, laboratory practice, and…

  7. Collection Analysis Project. Final Report.

    ERIC Educational Resources Information Center

    Dole, Wanda; And Others

    The Collection Analysis Project (CAP) was undertaken in response to one of the major recommendations of the University at Stony Brook Libraries' strategic plan. It is the first step in promoting the necessary change to bring collection management and development into conformity with accepted professional practice, and make it more responsive to…

  8. Spray casting project final report

    SciTech Connect

    Churnetski, S.R.; Thompson, J.E.

    1996-08-01

    Lockheed Martin Energy Systems, Inc. (Energy Systems), along with other participating organizations, has been exploring the feasibility of spray casting depleted uranium (DU) to near-net shape as a waste minimization effort. Although this technology would be useful in a variety of applications where DU was the material of choice, this effort was aimed primarily at gamma-shielding components for use in storage and transportation canisters for high-level radioactive waste, particularly in the Multipurpose Canister (MPC) application. In addition to the waste-minimization benefits, spray casting would simplify the manufacturing process by allowing the shielding components for MPC to be produced as a single component, as opposed to multiple components with many fabrication and assembly steps. In earlier experiments, surrogate materials were used to simulate the properties (specifically reactivity and density) of DU. Based on the positive results from those studies, the project participants decided that further evaluation of the issues and concerns that would accompany spraying DU was warranted. That evaluation occupied substantially all of Fiscal Year 1995, yielding conceptual designs for both an intermediate facility and a production facility and their associated engineering estimates. An intermediate facility was included in this study to allow further technology development in spraying DU. Although spraying DU to near-net shape seems to be feasible, a number of technical, engineering, and safety issues would need to be evaluated before proceeding with a production facility. This report is intended to document the results from the spray-casting project and to provide information needed by anyone interested in proceeding to the next step.

  9. Lagoon Restoration Project: Final report

    SciTech Connect

    1995-03-01

    This project is a multiyear effort focusing on energy flow in the Palace of Fine Arts lagoon just outside the Exploratorium in San Francisco. Phase 1 was a pilot study to determine the feasibility of improving biological energy flow through the small freshwater lagoon, using the expertise and resources of an environmental artist in collaboration with museum biologists and arts department staff. The primary outcome of Phase 1 is an experimental fountain exhibit inside the museum designed by public artist Laurie Lundquist with Exploratorium staff. This fountain, with signage, functions both as a model for natural aeration and filtration systems and as a focal point for museum visitors to learn about how biological processes cycle energy through aquatic systems. As part of the study of the lagoon`s health, volunteers continued biweekly bird consus from March through September, 1994. The goal was to find out whether the poor water quality of the lagoon is affecting the birds. Limited dredging was undertaken by the city Parks and Recreation Department. However, a more peermanent solution to the lagoon`s ecological problems would require an ambitious redesign of the lagoon.

  10. Project Ta-Kos Outreach. Final Report.

    ERIC Educational Resources Information Center

    Askew, Linda; Husted, Tony; Faris, Cindy

    This final report describes activities and accomplishments of Project Ta-Kos Outreach, a 3-year program to provide consultation and site-specific training for families, educators, and health care providers. Project Ta-kos, through its curriculum and training approach, was designed to increase the probability that children, ages birth through eight…

  11. The Let's Play! Project. Final Report.

    ERIC Educational Resources Information Center

    Mistrett, Susan

    This final report reviews activities and achievements of the "Let's Play!" project, an effort to apply assistive technology (AT) to promote the play skills of infants and toddlers with disabilities within their natural environments. The federally supported project was designed to assist county early intervention programs and developed,…

  12. EDUCATIONAL MEDIA RESEARCH ABSTRACTING PROJECT. FINAL REPORT.

    ERIC Educational Resources Information Center

    HYER, ANNA L.

    THIS PROJECT PROVIDED ABSTRACTING COVERAGE OF 33 FINAL REPORTS OF U.S. OFFICE OF EDUCATION FINANCED RESEARCH PROJECTS IN EDUCATIONAL MEDIA. AN ABSTRACTOR, DR. WILLIAM ALLEN, WAS HIRED TO EVALUATE AND EDIT OR REWRITE ABSTRACTS SUBMITTED BY RESEARCHERS, AND TO PREPARE ABSTRACTS IF NECESSARY. TWO ANALYTICAL REVIEWS ON SELECTED AREAS OF MEDIA RESEARCH…

  13. Basic Citizenship Competencies Project. Final Report.

    ERIC Educational Resources Information Center

    Remy, Richard; Turner, Mary Jane

    This document is the final report for the second phase of the Basic Citizenship Competencies Project (BCCP). During the first phase of the project, seven basic competencies and attendant capacities were developed by the BCCP staff. Five products dealing with citizenship competencies were developed for specific user groups: (1) a handbook of basic…

  14. California Prison Gang Project. Final Report.

    ERIC Educational Resources Information Center

    Cummins, Eric

    A project investigated the cultural life, ideology, and education systems of particular prison gangs. It focused on recent changes in the gang system regarding gang education, organizational structure, and the balance of power in prisons and in relations with street gangs. Finally, the project assessed California's response to its prison gangs, in…

  15. Field test of ultra-low head hydropower package based on marine thrusters. Final report

    SciTech Connect

    Not Available

    1983-12-01

    The project includes the design, fabrication, assembly, installation, and field test of the first full-scale operating hydropower package (turbine, transmission, and generator) based on a design which incorporates a marine-thruster as the hydraulic prime mover. Included here are: the project overview; engineering design; ultra-low head hydropower package fabrication; component procurement, cost control, and scheduling; thruster hydraulic section installation; site modeling and resulting recommended modifications; testing; and baseline environmental conditions at Stone Drop. (MHR)

  16. Development and Dissemination of a Multimedia Instructional Package for Use in Preservice and Inservice Training To Address Selection of Appropriate Literacy Media for Students with Visual Impairments. Project LMA Final Report.

    ERIC Educational Resources Information Center

    Koenig, Alan J.

    This report discusses the outcomes of a project that addressed the need for comprehensive and sequential instructional materials to teach preservice and inservice teachers strategies for selecting appropriate literacy media for students with visual impairments. In this three-year project, called Project LMA (Learning Media Assessment),…

  17. Demonstration of packaging materials alternatives to expanded polystyrene. Final report

    SciTech Connect

    Menke, D.M.

    1998-04-01

    The report presents information on the environmental, economical, and performance characteristics of alternative packaging materials. Three alternative cushioning materials were identified for evaluation within this research; starch-based foam planks, layered corrugated pads, and recycled polyethylene foam. Through some have been used as cushioning materials for some time, these materials are termed alternative because each offers unique features beyond their cushioning capabilities. These unique features include their manufacture from recycled materials, biodegradability, water solubility, recyclability, and reusability. The properties and cushioning characteristics of expanded polystyrene (EPS) represent the baseline for this research; evaluation results for each material are compared against those of EPS. Technical, environmental, and economic evaluations were completed to assess various characteristics and parameters concerning the cushioning materials.

  18. Pueblo Infant Parent Education Project (PIPE Project). Final Report.

    ERIC Educational Resources Information Center

    Western Illinois Univ., Macomb. Coll. of Education.

    In the third and final year of its demonstration grant, the PIPE Project refined and expanded services to families in seven Pueblo Indian communities. Project staff and local Community Health Representatives (CHRs) completed 82 developmental assessments, made more than 400 home visits, and provided ongoing educational services to 27 handicapped…

  19. Expedited technology demonstration project final report: final forms

    SciTech Connect

    Hopper, R W

    1999-05-01

    ETDP Final Forms was an attempt to demonstrate the fabrication and performance of a ceramic waste form immobilizing the hazardous and radioactive elements of the MSO/SR mineral residues. The ceramic material had been developed previously. The fabrication system was constructed and functioned as designed except for the granulator. Fabrication of our particular ceramic, however, proved unsatisfactory. The ceramic material design was therefore changed toward the end of the project, replacing nepheline with zircon as the sink for silica. Preliminary results were encouraging, but more development is needed. Fabrication of the new ceramic requires major changes in the processing: Calcination and granulation would be replaced by spray drying; and sintering would be at higher temperature. The main goal of the project--demonstrating the fabrication and performance of the waste form--was not achieved. This report summarizes Final Forms' activities. The problem of immobilizing the MSO/SR mineral residues is discussed.

  20. Pilot Project Technology Business Case: Mobile Work Packages

    SciTech Connect

    Thomas, Ken; Lawrie, Sean; Niedermuller, Josef

    2015-05-01

    Performance advantages of the new pilot project technologies are widely acknowledged, but it has proven difficult for utilities to derive business cases for justifying investment in these new capabilities. Lack of a business case is often cited by utilities as a barrier to pursuing wide-scale application of digital technologies to nuclear plant work activities. The decision to move forward with funding usually hinges on demonstrating actual cost reductions that can be credited to budgets and thereby truly reduce O&M or capital costs. Technology enhancements, while enhancing work methods and making work more efficient, often fail to eliminate workload such that it changes overall staffing and material cost requirements. It is critical to demonstrate cost reductions or impacts on non-cost performance objectives in order for the business case to justify investment by nuclear operators. The Business Case Methodology (BCM) was developed in September of 2015 to frame the benefit side of II&C technologies to address the “benefit” side of the analysis—as opposed to the cost side—and how the organization evaluates discretionary projects (net present value (NPV), accounting effects of taxes, discount rates, etc.). The cost and analysis side is not particularly difficult for the organization and can usually be determined with a fair amount of precision (not withstanding implementation project cost overruns). It is in determining the “benefits” side of the analysis that utilities have more difficulty in technology projects and that is the focus of this methodology. The methodology is presented in the context of the entire process, but the tool provided is limited to determining the organizational benefits only. This report describes a the use of the BCM in building a business case for mobile work packages, which includes computer-based procedures and other automated elements of a work package. Key to those impacts will be identifying where the savings are

  1. Pathways: Service Coordination Outreach Project. Final Report.

    ERIC Educational Resources Information Center

    Hecht, Elizabeth; Tuchman, Linda; Green, Meredith; Robbins, Sue; Rosin, Peggy; Schneider, Melanie; Duschak, Heidi

    This final report describes the activities and outcomes of a service coordination outreach project designed to assist states in meeting their urgent needs for qualified and appropriately trained personnel to carry out their new roles as service coordinators in the provision and coordination of early intervention services as stipulated in federal…

  2. Wisconsin Dissemination Planning Project. Final Report.

    ERIC Educational Resources Information Center

    Harmatuck, Loretta

    Activities of the final year are reported as they relate to the objectives of the Wisconsin Dissemination Planning (WDP) Project: (1) to develop a plan for coordination among the dissemination functions in the Department of Public Instruction (DPI) through a state-wide steering committee; (2) to complete a needs assessment for dissemination…

  3. Project Network. 1994-1995 Final Report.

    ERIC Educational Resources Information Center

    Medina, Pedro J.

    This document contains the final report and manual from Project Network, an experimental learning program that allowed adult literacy learners to interact via the Internet. The classes consisted of instruction in the following areas: basic keyboarding, simple networking techniques, accessing America Online, sending and receiving electronic mail…

  4. Special Education Dissemination Project. Final Report.

    ERIC Educational Resources Information Center

    Felker, Roberta M.

    The final report summarizes activities of a 3-year project which accomplished the following goals: (1) identification of the most pressing concerns in special education currently facing state and local education policymakers; (2) location of research information through the U.S. Department of Education and other sources which address these issues;…

  5. Current good manufacturing practice in manufacturing, packaging, labeling, or holding operations for dietary supplements. Final rule.

    PubMed

    2007-06-25

    The Food and Drug Administration (FDA) is issuing a final rule regarding current good manufacturing practice (CGMP) for dietary supplements. The final rule establishes the minimum CGMPs necessary for activities related to manufacturing, packaging, labeling, or holding dietary supplements to ensure the quality of the dietary supplement. The final rule is one of many actions related to dietary supplements that we are taking to promote and protect the public health.

  6. Hiilangaay Hydroelectric ProjectFinal Report

    SciTech Connect

    Twitchell, Sara; Stimac, Michael; Lang, Lisa; Witwer, Doreen; Jameson, Vincent

    2016-06-01

    The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible to move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy

  7. Zoo Project for Handicapped Children. Final Project Report.

    ERIC Educational Resources Information Center

    San Diego Unified School District, CA.

    Presented is the final report (1971-72) of San Diego's Zoo Project for Handicapped Children, designed to increase the language arts skills of 870 trainable or educable mentally handicapped or educationally handicapped children through the use of animals as motivating devices. The program included a teacher training program enabling teachers to…

  8. Prescription drugs; revocation of final guideline patient package inserts and withdrawal of draft guideline patient package inserts--Food and Drug Administration. Notice.

    PubMed

    1982-09-07

    The Food and Drug Administration (FDA) is revoking the final guideline patient package inserts for 5 classes of drugs and is withdrawing the draft guideline patient package inserts for 5 other classes of drugs. Elsewhere in this issue of the Federal Register, the agency is revoking the regulations that established general requirements for the preparation and distribution of patient package inserts for prescription drug products. Those regulations had established a pilot program that would have been applied to 10 classes of drugs for 3 years. This notice revokes the draft and final guidelines which described how manufactures might comply with the regulations with respect to affected classes of drug.

  9. Final Report for the NERI Project

    SciTech Connect

    John C. Lee

    2009-03-31

    This final report summarizes the research activities during the entire performance period of the NERI grant, including the extra 9 months granted under a no-cost time extension. Building up on the 14 quarterly reports submitted through October 2008, we present here an overview of the research accomplishments under the five tasks originally proposed in July 2004, together with citations for publications resulting from the project. The AFCI-NERI project provided excellent support for two undergraduate and 10 graduates students at the University of Michigan during a period of three years and nine months. Significant developments were achieved in three areas: (1) Efficient deterministic fuel cycle optimization algorithms both for PWR and SFR configurations, (2) Efficient search algorithm for PWR equilibrium cycles, and (3) Simplified Excel-based script for dynamic fuel cycle analysis of diverse cycles. The project resulted in a total of 8 conference papers and three journal papers, including two that will be submitted shortly. Three pending publications are attached to the report.

  10. Northeast Oregon Hatchery Project, Final Siting Report.

    SciTech Connect

    Watson, Montgomery

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  11. Waste Package Project quarterly report, July 1, 1995--September 30, 1995

    SciTech Connect

    Ladkany, S.G.

    1995-11-15

    The following tasks are reported: overview and progress of nuclear waste package project and container design; nuclear waste container design considerations; structural investigation of multi purpose nuclear waste package canister; and design requirements of rock tunnel drift for long-term storage of high-level waste (faulted tunnel model study by photoelasticity/finite element analysis).

  12. Griffith Energy Project Final Environmental Impact Statement

    SciTech Connect

    N /A

    1999-04-02

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.

  13. SPEAR 3 Upgrade Project: The Final Year

    SciTech Connect

    Hettel, R

    2004-04-19

    During April, 2003, the SPEAR 2 storage ring, which served the high energy physics community from 1972 to 1987, and the synchrotron radiation community for an additional 15 years, was removed from its shielding tunnel in order to install the new 3-GeV, 500-mA SPEAR 3 light source. From May to November, SSRL will excavate the tunnel floor and pour a new concrete floor, and then install pre-assembled girders holding magnets, copper vacuum chambers, PEP-II-style rf cavities, and beam line front end components. At the same time, power supply, instrumentation and control, and other ancillary systems will be configured, leading to a commissioning period beginning in November 2003. The progress of accelerator component implementation and installation during the final year of the project will be reviewed.

  14. Dissemination Package for Transition into Electronics (TIE) Project, October 1979-June 1980.

    ERIC Educational Resources Information Center

    Evergreen Valley Coll., San Jose, CA.

    This dissemination package consists of a variety of advertising materials, forms, questionnaires, tests, and handouts developed as a part of the Transition into Electronics (TIE) Project. (The TIE Project was a project that developed, implemented, and evaluated a model designed to encourage persons to pursue education and training leading to…

  15. The LiveWire Project final report

    SciTech Connect

    Brown, C.D.; Nelson, T.T.; Kelly, J.C.; Dominguez, H.A.

    1997-10-01

    Utilities across the US have begun pilot testing a variety of hardware and software products to develop a two-way communications system between themselves and their customers. Their purpose is to reduce utility operating costs and to provide new and improved services for customers in light of pending changes in the electric industry being brought about by deregulation. A consortium including utilities, national labs, consultants, and contractors, with the support of the Department of Energy (DOE) and the Electric Power Research Institute (EPRI), initiated a project that utilized a hybrid fiber-coax (HFC) wide-area network integrated with a CEBus based local area network within the customers home. The system combined energy consumption data taken within the home, and home automation features to provide a suite of energy management services for residential customers. The information was transferred via the Internet through the HFC network, and presented to the customer on their personal computer. This final project report discusses the design, prototype testing, and system deployment planning of the energy management system.

  16. Remote handling in the Plutonium Immobilization Project: Puck packaging

    SciTech Connect

    Kriikku, E.

    1999-07-01

    The Savannah River Site (SRS) will immobilize excess plutonium in the proposed Plutonium Immobilization Project (PIP). The PIP scope includes unloading transportation containers, preparing the feed streams, converting the metal feed to an oxide, adding the ceramic precursors, pressing the pucks, inspecting pucks, and sintering pucks. The PIP scope also includes loading the pucks into metal cans, sealing the cans, inspecting the cans, loading the cans into magazines, loading magazines into Defense Waste Processing Facility (DWPF) canisters, and transporting the canisters to the DWPF. The DWPF will fill the canister with a mixture of high-level waste and glass for permanent storage. Because of the radiation, remote equipment will perform PIP operations in a contained environment. The PIP puck packaging includes loading pucks into metal cans, sealing the cans, and inspecting the cans. A magnetically coupled elevator will lower a tray of pucks onto a magnetically coupled transport cart. This cart will carry the tray through an air lock into the can-loading glove box. Inside the glove box, a magnetically coupled tray lifter will raise the tray off the cart. A three-axis Cartesian robot will use a vacuum cup on a long pipe to lift the 67.3-mm (2.65-in.)-diam, 25.4-mm (1.0-in.)-tall pucks from the transfer tray and place 20 pucks in a 76.2-mm (3.0-in.)-diam stainless steel can. The Cartesian robot will place a custom hood on the open metal can, and this hood will remove the air from the can, insert helium, and place a hollow plug in the can. The SRS-developed bagless transfer system will weld the plug to the can wall and cut the can in the weld area. The can stub and the upper plug half above the cut line will remain in the sphincter seal to maintain the glove-box seal. The puck can and the lower plug half below the cut line is lowered into the bagless transfer enclosure. A floor-mounted robot in this enclosure will swipe the can exterior for contamination and place the

  17. Ice Load Project Final Technical Report

    SciTech Connect

    McCoy, Timothy J.; Brown, Thomas; Byrne, Alex

    2014-10-30

    As interest and investment in offshore wind projects increase worldwide, some turbines will be installed in locations where ice of significant thickness forms on the water surface. This ice moves under the driving forces of wind, current, and thermal effects and may result in substantial forces on bottom-fixed support structures. The North and Baltic Seas in Europe have begun to see significant wind energy development and the Great Lakes of the United States and Canada may host wind energy development in the near future. Design of the support structures for these projects is best performed through the use of an integrated tool that can calculate the cumulative effects of forces due to turbine operations, wind, waves, and floating ice. The dynamic nature of ice forces requires that these forces be included in the design simulations, rather than added as static forces to simulation results. The International Electrotechnical Commission (IEC) standard[2] for offshore wind turbine design and the International Organization for Standardization (ISO) standard[3] for offshore structures provide requirements and algorithms for the calculation of forces induced by surface ice; however, currently none of the major wind turbine dynamic simulation codes provides the ability to model ice loads. The scope of work of the project described in this report includes the development of a suite of subroutines, collectively named IceFloe, that meet the requirements of the IEC and ISO standards and couples with four of the major wind turbine dynamic simulation codes. The mechanisms by which ice forces impinge on offshore structures generally include the forces required for crushing of the ice against vertical-sided structures and the forces required to fracture the ice as it rides up on conical-sided structures. Within these two broad categories, the dynamic character of the forces with respect to time is also dependent on other factors such as the velocity and thickness of the moving ice

  18. Individualized Instruction in Science, Earth Space Project, Learning Activities Package.

    ERIC Educational Resources Information Center

    Kuczma, R. M.

    Learning Activity Packages (LAP) relating to the earth and space are presented for use in sampling a new type of learning for a whole year. Eighteen topics are incorporated into five units: (1) introduction to individualized learning, (2) observation versus interpretation, (3) chemistry in the space age, (4) the space age interdisciplines, and (5)…

  19. Biomedical Interdisciplinary Curriculum Project: BIP (Biomedical Instrumentation Package) User's Manual.

    ERIC Educational Resources Information Center

    Biomedical Interdisciplinary Curriculum Project, Berkeley, CA.

    Described is the Biomedical Instrument Package (BIP) and its use. The BIP was developed for use in understanding colorimetry, sound, electricity, and bioelectric phenomena. It can also be used in a wide range of measurements such as current, voltage, resistance, temperature, and pH. Though it was developed primarily for use in biomedical science…

  20. The Women Entrepreneurs Project. Final Report.

    ERIC Educational Resources Information Center

    McCaslin, Barbara S.; And Others

    Business ownership training materials appropriate for uses in vocational education settings with women clients were developed and tested. A survey of California women business owners was made to identify the characteristics and needs of women entrepreneurs. A series of eight self-paced, student-centered Learning Activities Packages (LAP's) was…

  1. Waste package performance assessment for the Yucca Mountain project

    SciTech Connect

    O`Connell, W.J.; Lappa, D.A.; Thatcher, R.M.

    1989-12-31

    The authors completed a first cycle of model development from a specification to a computer program, PANDORA-1, for long-term performance assessment of waste packages. The model for one waste package at a time incorporates processes specific to the unsaturated environment at the proposed Yucca Mountain, NV, site. PANDORA-1 models the most likely processes and several modes of waste alteration and release. The development identified information needs for future models; many processes, local details, and combinations will have to be examined. Integration of ensemble performance and quantification of uncertainties are modeling steps at higher aggregation. Methodologies for these steps include sampling, which is well studied; we have focused on several open questions. The authors can now calculate the amount of variance reduction available from Latin hypercube sampling; it is a limited reduction. A new method, uncertainty analysis test-bed program compares the new with old sampling methods.

  2. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan to...

  3. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan to...

  4. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan to...

  5. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan to...

  6. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan...

  7. TX-100 manufacturing final project report.

    SciTech Connect

    Ashwill, Thomas D.; Berry, Derek S.

    2007-11-01

    This report details the work completed under the TX-100 blade manufacturing portion of the Carbon-Hybrid Blade Developments: Standard and Twist-Coupled Prototype project. The TX-100 blade is a 9 meter prototype blade designed with bend-twist coupling to augment the mitigation of peak loads during normal turbine operation. This structural coupling was achieved by locating off axis carbon fiber in the outboard portion of the blade skins. The report will present the tooling selection, blade production, blade instrumentation, blade shipping and adapter plate design and fabrication. The baseline blade used for this project was the ERS-100 (Revision D) wind turbine blade. The molds used for the production of the TX-100 were originally built for the production of the CX-100 blade. The same high pressure and low pressure skin molds were used to manufacture the TX-100 skins. In order to compensate for the difference in skin thickness between the CX-100 and the TX-100, however, a new TX-100 shear web plug and mold were required. Both the blade assembly fixture and the root stud insertion fixture used for the CX-100 blades could be utilized for the TX-100 blades. A production run of seven TX-100 prototype blades was undertaken at TPI Composites during the month of October, 2004. Of those seven blades, four were instrumented with strain gauges before final assembly. After production at the TPI Composites facility in Rhode Island, the blades were shipped to various test sites: two blades to the National Wind Technology Center at the National Renewable Energy Laboratory in Boulder, Colorado, two blades to Sandia National Laboratory in Albuquerque, New Mexico and three blades to the United States Department of Agriculture turbine field test facility in Bushland, Texas. An adapter plate was designed to allow the TX-100 blades to be installed on existing Micon 65/13M turbines at the USDA site. The conclusion of this program is the kick-off of the TX-100 blade testing at the three

  8. Data processing unit and power system for the LANL REM instrument package. Final report

    SciTech Connect

    Lockhart, W.

    1994-03-01

    The NEPSTP spacecraft needs highly reliable instrumentation to measure the nuclear reactor health and performance. These reactor measurements are essential for initial on-orbit phase operations and documentation of performance over time. Los Alamos National Laboratory (LANL), under the guidance of W. C. Feldman, principal investigator, has designed the Radiation Environment Monitoring (REM) package to meet these needs. The instrumentation package contains two neutron detectors, one gamma-ray detector, a data processing unit, and an instrument power system. The REM package is an integration of quick turn-around, state of the practice technology for detectors, data processors, and power systems. A significant portion of REM consists of subsystems with flight history. Southwest Research Institute (SwRI) has been tasked by LANL to design support electronics, including the Data Processing Unit (DPU) and Power System for REM. The goal for this project is to use technologies from current programs to speed up and simplify the design process. To meet these design goals, the authors use an open architecture VME bus for the DPU and derivatives of CASSINI power supplies for the instrument power system. To simplify integration and test activities, they incorporate a proven software development strategy and tool kits from outside vendors. The objective of this report is to illustrate easily incorporated system level designs for the DPU, power system and ground support electronics (GSE) in support of the important NEPSTP program.

  9. Design of low cost, ultra-low head hydropower package based on marine thrusters. Final report

    SciTech Connect

    Not Available

    1981-08-01

    The object of this investigation was to determine the technical and economic feasibility of using marine thrusters as hydraulic turbines in ultralow head (3 meters or less) hyro power plants. Marine thrusters are primarily used in large ships for propulsion and maneuvering, i.e., as axial flow pumps that move through water. As fixed units in a dam, a thruster, acting as a turbine, would have its output shaft mechanically linked by a belt drive to a generator drive shaft. The design of this ultralow head power system is shown. The results of performance and cost analyses are presented. Eleven distinctively sized applications were developed and casted. Package costs, less civil works and installation, ranged from approximately $25,000 to slightly over $120,000. The corresponding range of predicted power outputs at 3 m (9.84 ft) head is 40 KW to 630 KW per package. Average cost of the ER and A-designed ULHH package is about $260/KW at three meters. Each unit was further characterized for operation between 6 and 15 feet of head. Based on the enginering results of the project and promise for significant cost-reduction, the fabrication, installation and testing of a full-scale unit at an appropriate site is proposed. (LpromieL)

  10. MLNSC instrument design and simulation package, task order 57 (modified). Final report, September 30, 1997

    SciTech Connect

    Seeger, P.A.

    1997-10-03

    The objectives of this task as described in Statement of Work have been met and the documents required as Deliverables have been prepared and submitted to the requester. Specifically, a document titled ``The MCLIB Library: Monte Carlo Simulation of Neutron Scattering Instruments,`` revised September 23, 1997, includes documentation of new standards, code revisions and additions, and some improved efficiency due to improved optimization strategies. The procedures for user implementation of new optical devices, and information on using the package and reading and viewing the output have also been included. Second, a new document entitled ``MCLIB Element Definitions and Help`` was written and revised through the duration of the task, to supply the needed input to group CIC-15 for the purpose of integrating the MCLIB package with a web-based user interface. Finally, an application of the package was presented and a (successful) demonstration of the new user interface was given at a workshop at Argonne National Laboratory, August 24--26, 1997, as described in the modification to the Statement of Work.

  11. Chapter 1 Schoolwide Project Study. Final Report.

    ERIC Educational Resources Information Center

    Schenck, E. Allen; Beckstrom, Sharon

    Chapter 1 schoolwide projects are intended to serve educationally disadvantaged students by improving the instructional program provided to all students in high-poverty schools. This report provides a comprehensive look at schoolwide projects in the 1991-92 school year, using data from surveys of all schoolwide project schools. The response rate…

  12. The PIE Institute Project: Final Evaluation Report

    ERIC Educational Resources Information Center

    St. John, Mark; Carroll, Becky; Helms, Jen; Smith, Anita

    2008-01-01

    The Playful Invention and Exploration (PIE) Institute project was funded in 2005 by the National Science Foundation (NSF). For the past three years, Inverness Research has served as the external evaluator for the PIE project. The authors' evaluation efforts have included extensive observation and documentation of PIE project activities; ongoing…

  13. High Priority Infant Tracking Project. Final Report.

    ERIC Educational Resources Information Center

    Biro, Patricia J.; And Others

    The study compared the effectiveness of the Washington State High Priority Infant Tracking Project in maintaining high risk infants in continuing health care, determining health and developmental outcomes, and surveying the use of community resources with other state tracking projects. The project identifies infants during the first 30 days of…

  14. The Utah Newspaper Project. Final Report.

    ERIC Educational Resources Information Center

    Holley, Robert P.

    As part of the United States Newspaper Program, the Marriott Library at the University of Utah undertook the Utah Newspaper Project, a major microfilming project funded by the National Endowment for the Humanities. This report reviews the background of the project, describes the grant application process, and discusses the activities of: (1) the…

  15. High Priority Infant Tracking Project. Final Report.

    ERIC Educational Resources Information Center

    Biro, Patricia J.; And Others

    The study compared the effectiveness of the Washington State High Priority Infant Tracking Project in maintaining high risk infants in continuing health care, determining health and developmental outcomes, and surveying the use of community resources with other state tracking projects. The project identifies infants during the first 30 days of…

  16. Drilling engineering package used for extended reach project

    SciTech Connect

    Chapman, P. ); Good, A. )

    1995-02-20

    Extended reach drilling can improve the economics of some field developments by minimizing the number of facilities required to access remote reserves. The technique requires detailed engineering design and monitoring, however, to minimize the risk of operating at the limits of drilling equipment. Working as a team over the past 4 years, BP Exploration (BPX) and Baker Hughes Inteq have developed an integrated drilling engineering package for the planning, monitoring, and review of well construction data. The drilling engineering application platform (DEAP) is now used by BP Exploration worldwide for the integrated engineering design, monitoring, and review of its wells. These engineering applications are linked together via a data base and drilling reporting system. Integration between rig site reporting and the engineering applications allows the current drilling operation to be analyzed at the touch of a single computer button. DEAP also provides links to commercially available software packages. This facility, along with its graphical user interface, encourages and simplifies the use of engineering tools at the rig site. The full capabilities of DEAP can perhaps be seen as four key functions necessary for successful well bore construction management.

  17. Waste package performance assessment for the Yucca Mountain Project

    SciTech Connect

    O'Connell, W.J.; Lappa, D.A.; Thatcher, R.M.

    1989-02-01

    We completed a first cycle of model development from a specification to a computer program, PANDORA-1, for long-term performance assessment of waste packages. The model for one waste package at a time incorporates processes specific to the unsaturated environment at the proposed Yucca Mountain, NV, site. PANDORA-1 models the most likely processes and several modes of waste alteration and release. The development identified information needs for future models; many processes, local details, and combinations will have to be examined. Integration of ensemble performance and quantification of uncertainties are modeling steps at higher aggregation. Methodologies for these steps include sampling, which is well studied; we have focused on several open questions. We can now calculate the amount of variance reduction available from Latin hypercube sampling; it is a limited reduction. A new method, controlled sampling, provides substantial variance reduction for a broad range of model functions. An uncertainty analysis test-bed program compares the new with old sampling methods. 7 refs., 1 tab.

  18. Energy Storage and Distributed Energy Generation Project, Final Project Report

    SciTech Connect

    Schwank, Johannes; Mader, Jerry; Chen, Xiaoyin; Mi, Chris; Linic, Suljo; Sastry, Ann Marie; Stefanopoulou, Anna; Thompson, Levi; Varde, Keshav

    2008-03-31

    This report serves as a Final Report under the “Energy Storage and Distribution Energy Generation Project” carried out by the Transportation Energy Center (TEC) at the University of Michigan (UM). An interdisciplinary research team has been working on fundamental and applied research on: -distributed power generation and microgrids, -power electronics, and -advanced energy storage. The long-term objective of the project was to provide a framework for identifying fundamental research solutions to technology challenges of transmission and distribution, with special emphasis on distributed power generation, energy storage, control methodologies, and power electronics for microgrids, and to develop enabling technologies for novel energy storage and harvesting concepts that can be simulated, tested, and scaled up to provide relief for both underserved and overstressed portions of the Nation’s grid. TEC’s research is closely associated with Sections 5.0 and 6.0 of the DOE "Five-year Program Plan for FY2008 to FY2012 for Electric Transmission and Distribution Programs, August 2006.”

  19. Project Final Report: HPC-Colony II

    SciTech Connect

    Jones, Terry R; Kale, Laxmikant V; Moreira, Jose

    2013-11-01

    This report recounts the HPC Colony II Project which was a computer science effort funded by DOE's Advanced Scientific Computing Research office. The project included researchers from ORNL, IBM, and the University of Illinois at Urbana-Champaign. The topic of the effort was adaptive system software for extreme scale parallel machines. A description of findings is included.

  20. Northeast Regional Education Planning Project. Final Report.

    ERIC Educational Resources Information Center

    Northeast Regional Exchange Steering Committee, Boston, MA.

    Created to facilitate the dissemination of information between researchers and the educational community, the Northeast Regional Exchange steering committee has defined needs, determined agency qualifications, identified priorities, undertaken a series of minigrant projects, and developed plans for the extension of these projects and a study of…

  1. The Oregon Applied Academics Project: Final Report

    ERIC Educational Resources Information Center

    Pearson, Donna; Richardson, George B.; Sawyer, Jennifer M.

    2013-01-01

    This report contains the findings of the Oregon Applied Academics research and development project which spanned three academic years from 2010 through 2013. The overall purpose of the project was to develop and implement a technical math course that would meet graduation requirements and improve student performance. The State of Oregon has been…

  2. New and Emerging Occupations Project. Final Report.

    ERIC Educational Resources Information Center

    Southeast Community Coll., Lincoln, NE.

    This document reports a project to define, identify, and describe new and emerging occupations in Nebraska and disseminate that information to vocational education program and curriculum planners. Chapter 1 describes the background, problem, and purpose of the project. Chapter 2 sets forth the objectives and discusses procedures for developing a…

  3. Human Relations Education Project. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Buffalo Board of Education, NY.

    This project did the planning and pilot phases of an effort to improve the teaching of human relations in grades K-12 of public and private schools in the Buffalo-Niagara Falls metropolitan area. In the pilot phase, the project furnished on-the-job training for approximately 70 schools. The training was given by teams of human relations…

  4. Career Exploration in Computers Project. Final Report.

    ERIC Educational Resources Information Center

    Hazard Community Coll., KY.

    The Career Exploration in Computers Project assisted 146 young people between 18 and 21 who were employed during the summer in the Head Start program. The project introduced and reinforced the concept of career choice and broadened the perspective of those in data processing career tracks. Four populations were served: adults preparing for the…

  5. [UMOS Child Center Project. Final Report.

    ERIC Educational Resources Information Center

    United Migrant Opportunity Services, Inc., Milwaukee, WI.

    This report presents a description and a brief evaluation of the Child Center Project, a bilingual-bicultural early childhood development program designed to prepare preschool Latino children to succeed in school without losing their bilingual-bicultural identity. Funded by the Office of Child Development, the three-year project was initiated in…

  6. New and Emerging Occupations Project. Final Report.

    ERIC Educational Resources Information Center

    Southeast Community Coll., Lincoln, NE.

    This document reports a project to define, identify, and describe new and emerging occupations in Nebraska and disseminate that information to vocational education program and curriculum planners. Chapter 1 describes the background, problem, and purpose of the project. Chapter 2 sets forth the objectives and discusses procedures for developing a…

  7. Hispanic Vocational Exploration Project. Final Report.

    ERIC Educational Resources Information Center

    Centro De La Comunidad, Inc., New London, CT.

    During its second year, the Hispanic Vocational Exploration Project recruited eighth and ninth grade Hispanic youth for a four-week cycle, after-school, career exploratory program at Southeastern Regional Vocational Technical School, Groton, Connecticut. A series of career education workshops was the other major project activity. Supportive…

  8. Community College Technical Mathematics Project. Final Report.

    ERIC Educational Resources Information Center

    Self, Samuel L.

    The purpose of the research project was to develop an applied or technical mathematics curriculum which would meet the needs of vocational-technical students at the community college level. The research project was divided into three distinct phases: Identifying the mathematical concepts requisite for job-entry competencies in each of the…

  9. Well Elderly Integrated Training Project. Final Report.

    ERIC Educational Resources Information Center

    Summit-Portage Area Health Education Network, Akron, OH.

    The Well Elderly Integrated Training Project was conceptualized as a service-oriented endeavor with an evaluation component. The project required that a university medical school resource faculty develop an integrated training program and materials on health education (wellness) for trainers who were respected, healthy elderly high in the senior…

  10. LANE COUNTY YOUTH PROJECT. FINAL REPORT.

    ERIC Educational Resources Information Center

    BREWER, EDGAR W.; AND OTHERS

    A GROUP OF LANE COUNTY, OREGON, CITIZENS WHO WERE CONCERNED ABOUT JUVENILE DELINQUENCY BANDED TOGETHER IN 1962 TO ESTABLISH THE LANE COUNTY YOUTH PROJECT (LCYP). THE PRIMARY PURPOSE OF LCYP WAS TO PLAN A MAJOR DEMONSTRATION PROJECT AIMED AT THE PREVENTION AND CONTROL OF DELINQUENCY AND RELATED YOUTH PROBLEMS IN BOTH RURAL AND SMALL CITY SETTINGS.…

  11. Northeast Regional Education Planning Project. Final Report.

    ERIC Educational Resources Information Center

    Northeast Regional Exchange Steering Committee, Boston, MA.

    Created to facilitate the dissemination of information between researchers and the educational community, the Northeast Regional Exchange steering committee has defined needs, determined agency qualifications, identified priorities, undertaken a series of minigrant projects, and developed plans for the extension of these projects and a study of…

  12. Well Elderly Integrated Training Project. Final Report.

    ERIC Educational Resources Information Center

    Summit-Portage Area Health Education Network, Akron, OH.

    The Well Elderly Integrated Training Project was conceptualized as a service-oriented endeavor with an evaluation component. The project required that a university medical school resource faculty develop an integrated training program and materials on health education (wellness) for trainers who were respected, healthy elderly high in the senior…

  13. Training for Planning Project. Final Report.

    ERIC Educational Resources Information Center

    Paddock, Susan C.

    Concerned with training local educational agencies in planning and administering community education programs, this report summarizes a year-long project in Arizona, New Mexico, and Colorado. Included are a narrative description of the project and its activities, a list of objectives and agenda subects, assessment, a summary evaluation, and…

  14. Science for the Eighties: Final Project Report.

    ERIC Educational Resources Information Center

    Magidson, Errol M.

    This report summarizes the goals, objectives, and activities of a project conducted at Kennedy-King College to provide the time and resources for instructors to develop multi-media curriculum materials for use in biology, psychology, and social science courses. Introductory material outlines project objectives in terms of resource development and…

  15. VTAE Economic Development Project. Final Report.

    ERIC Educational Resources Information Center

    Klitzke, Elizabeth

    A project was undertaken to redefine the role of vocational, technical, and adult education (VTAE) in economic development in Wisconsin. Included among the objectives of the project were the following: to produce a statewide plan for economic development identifying new linkages among business, industry, labor, and the VTAE system; to develop…

  16. A MATLAB package for the EIDORS project to reconstruct two-dimensional EIT images.

    PubMed

    Vauhkonen, M; Lionheart, W R; Heikkinen, L M; Vauhkonen, P J; Kaipio, J P

    2001-02-01

    The EIDORS (electrical impedance and diffuse optical reconstruction software) project aims to produce a software system for reconstructing images from electrical or diffuse optical data. MATLAB is a software that is used in the EIDORS project for rapid prototyping, graphical user interface construction and image display. We have written a MATLAB package (http://venda.uku.fi/ vauhkon/) which can be used for two-dimensional mesh generation, solving the forward problem and reconstructing and displaying the reconstructed images (resistivity or admittivity). In this paper we briefly describe the mathematical theory on which the codes are based on and also give some examples of the capabilities of the package.

  17. Project Future Workplace Literacy Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Jefferson County Public Schools, Louisville, KY.

    Project Future was a 3-year project begun in 1994 as a partnership between the Jefferson County Public Schools and Futura Plastics and Engineering, Inc., Louisville, Kentucky. The project targeted the workplace basic skills of plastic injection molding production workers. The skills classes improved the general education of the workers with…

  18. Rural Textile Workers Literacy Enhancement Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Enterprise State Junior Coll., AL.

    This document consists of the final report and sample curricula from the Rural Textile Workers Literacy Enhancement Project. The final report details how the project was initiated in April 1993 to help employees of five textile and apparel manufacturing companies in southeastern Alabama improve their literacy and numeracy skills. A second…

  19. Smart Gun Technology project. Final report

    SciTech Connect

    Weiss, D.R.

    1996-05-01

    The goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user form firing a law officer`s firearm by implementing user-recognizing-and-authorizing (or {open_quotes}smart{close_quotes}) surety technologies. This project was funded by the National Institute of Justice. This report lists the findings and results of the project`s three primary objectives. First, to find and document the requirements for a smart firearm technology that law enforcement officers will value. Second, to investigate, evaluate, and prioritize technologies that meet the requirements for a law enforcement officer`s smart firearm. Third, to demonstrate and document the most promising technology`s usefulness in models of a smart firearm.

  20. Superconductive ADC Project Fabrication Package. Final Design Review Package (Briefing Charts)

    DTIC Science & Technology

    2010-09-07

    Simulation Results Iin 1.45mV 2.5Ω 1pH 4pH 100fF 310uA 1fΩ Ic = 300uA Rn = 0.8Ω Cs = 0.32pF Ic = 300uA Rn = 0.8Ω Cs = 0.32pF Iin Vout Vout Ic = 500uA Rn...0.55Ω Cs = 0.32pF ONR Superconductive ADC CLIN/SLIN 0001AD September 2010, Brad Perranoski Pg. 17 Modulator Design Documentation Comparator Design...Comparator Design - Cadence Schematic & Simulation Comparator Testbench Simulation Results 1.45mV 2.5Ω 1pH 4pH 100fF 310uA 1fΩSine wave 100uApk Iin Ic

  1. 21 CFR 1240.61 - Mandatory pasteurization for all milk and milk products in final package form intended for direct...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... pasteurization for all milk and milk products in final package form intended for direct human consumption. (a) No... for sale or other distribution after shipment in interstate commerce any milk or milk product in final... ingredients (milk or milk products) that have all been pasteurized, except where alternative procedures...

  2. User's Guide for MapIMG 2: Map Image Re-projection Software Package

    USGS Publications Warehouse

    Finn, Michael P.; Trent, Jason R.; Buehler, Robert A.

    2006-01-01

    BACKGROUND Scientists routinely accomplish small-scale geospatial modeling in the raster domain, using high-resolution datasets for large parts of continents and low-resolution to high-resolution datasets for the entire globe. Direct implementation of point-to-point transformation with appropriate functions yields the variety of projections available in commercial software packages, but implementation with data other than points requires specific adaptation of the transformation equations or prior preparation of the data to allow the transformation to succeed. It seems that some of these packages use the U.S. Geological Survey's (USGS) General Cartographic Transformation Package (GCTP) or similar point transformations without adaptation to the specific characteristics of raster data (Usery and others, 2003a). Usery and others (2003b) compiled and tabulated the accuracy of categorical areas in projected raster datasets of global extent. Based on the shortcomings identified in these studies, geographers and applications programmers at the USGS expanded and evolved a USGS software package, MapIMG, for raster map projection transformation (Finn and Trent, 2004). Daniel R. Steinwand of Science Applications International Corporation, National Center for Earth Resources Observation and Science, originally developed MapIMG for the USGS, basing it on GCTP. Through previous and continuing efforts at the USGS' National Geospatial Technical Operations Center, this program has been transformed from an application based on command line input into a software package based on a graphical user interface for Windows, Linux, and other UNIX machines.

  3. The NICU Follow-Through Project. Final Report.

    ERIC Educational Resources Information Center

    Bennett, Forrest C.; Hedlund, Rodd E.

    This final report describes activities and accomplishments of the NICU Follow-Through Project, a 3-year project designed to help hospital neonatal intensive care units (NICUs) and community developmental centers serving infants with disabilities or very low birth weights (VLBW) replicate the project's innovative and successful training components.…

  4. Career Development Outreach Program Exemplary Project. Final Report.

    ERIC Educational Resources Information Center

    Sommer, Sharon L.

    The document is the final report of the career development outreach project. The project was designed to actively involve a systematic program of career education, dissemination of occupational information, and career guidance. The project was to make the target population (students, faculty, and staff at the University of Maine at Farmington and…

  5. Project Recurso, 1989-1990. Final Evaluation Report. OREA Report.

    ERIC Educational Resources Information Center

    Rivera, Natasha

    This report presents final (fifth year) results of Project Recurso, a federally funded project which provided 147 Spanish-speaking special education students (grades 3-5) in 12 New York City schools with instruction in English as a Second Language (ESL), Native Language Arts (NLA), and bilingual content area subjects. The project also provided…

  6. Project Kaleidoscope, 1996-2000. Final Report: Executive Summary.

    ERIC Educational Resources Information Center

    George Mason Univ., Fairfax, VA. Helen A. Kellar Inst. for Human disAbilities.

    This final report describes the activities and outcomes of Project Kaleidoscope, a grant funded project designed to develop, field test, and disseminate training materials and methods to prepare personnel to better serve culturally, linguistically and developmentally diverse young children and their families. The project addressed the central…

  7. Special Education Evaluation Project for University Affiliated Facilities. Final Report.

    ERIC Educational Resources Information Center

    Burrello, Leonard C.; And Others

    The final report of the Special Education Evaluation Project for 16 University Affiliated Facilities (UAF) centers provides a chronological review of the project which focused on the training of persons to work with mentally retarded or other handicapped individuals. Outlined are project objectives including the development of descriptors useful…

  8. Solar greenhouse project. Final technical report

    SciTech Connect

    Not Available

    1983-06-03

    Three (3) passive solar greenhouses were constructed as lean-to attachment to the homes of three (3) low-income families in Mecklenburg County, North Carolina as a demonstration project. CETA labor was provided by a training and work experience project for home repair and construction skills. Some of the walls were constructed from old salvaged windows and a local block company donated blocks that were used for the foundation. Recipients of the greenhouses reported reduced air drafts and fuel consumption savings. Flowers and vegetables were successfully grown during the winter months.

  9. NYU Ultracomputer project. Final project summary, 1979-1993

    SciTech Connect

    Gottlieb, A.

    1994-10-01

    This report discusses the following on the Ultracomputer project: simulation studies; network analysis; prototype hardware; VSLI design; coordination algorithms; systems software; application software; and compiler development.

  10. Sweetwater National Workplace Literacy Project. Final Report.

    ERIC Educational Resources Information Center

    Sweetwater Union High School District, Chula Vista, CA.

    The Sweetwater National Workplace Literacy Project was undertaken to develop the following: (1) industry/company-specific individualized literacy skills training for currently employed adults and (2) individualized, preemployment workplace literacy and job-specific skills training for unemployed or underemployed adults. The following site-specific…

  11. Automated metadata--final project report

    SciTech Connect

    Schissel, David

    2016-04-01

    This report summarizes the work of the Automated Metadata, Provenance Cataloging, and Navigable Interfaces: Ensuring the Usefulness of Extreme-Scale Data Project (MPO Project) funded by the United States Department of Energy (DOE), Offices of Advanced Scientific Computing Research and Fusion Energy Sciences. Initially funded for three years starting in 2012, it was extended for 6 months with additional funding. The project was a collaboration between scientists at General Atomics, Lawrence Berkley National Laboratory (LBNL), and Massachusetts Institute of Technology (MIT). The group leveraged existing computer science technology where possible, and extended or created new capabilities where required. The MPO project was able to successfully create a suite of software tools that can be used by a scientific community to automatically document their scientific workflows. These tools were integrated into workflows for fusion energy and climate research illustrating the general applicability of the project’s toolkit. Feedback was very positive on the project’s toolkit and the value of such automatic workflow documentation to the scientific endeavor.

  12. Project Step Ahead. Final Performance Report.

    ERIC Educational Resources Information Center

    New Mexico State Univ., Las Cruces. Dept. of English.

    This report describes a National Workplace Literacy Demonstration project that provided onsite training at participating New Mexico hospitals in job-specific literacy skills necessary for satisfactory job performance. Six courses were offered that integrated language skills with reading, writing, and speaking components--Straight Talk:…

  13. Trucking Industry Training Project. Final Report.

    ERIC Educational Resources Information Center

    Sanburn, Donald D.

    The report was prepared under a grant made to investigate the possibilities of establishing an organized system of training for the trucking industry. It discusses attempts to disseminate information on training, learned through operation of an experimental and demonstration project in Pico Rivera, California. It discusses problems of compliance…

  14. American History Laboratory Project. Final Report.

    ERIC Educational Resources Information Center

    Taylor, William R.

    The results of an experimental project in American history which introduced to students the methods of historical investigation in specific historical areas through small group research rather than through the college survey course are described in this report. Discussed are (1) the course organization, consisting of two semester units in which…

  15. Home Energy Conservation Training Project. Final Report.

    ERIC Educational Resources Information Center

    West Virginia Univ., Morgantown. Coll. of Human Resources and Education.

    Described is a project designed to present four training sessions for community specialists representing outreach interests such as cooperative extension, senior citizens organizations, and welfare agencies. Training consists of instruction in contemporary knowledge, skills, and methods of home energy conservation, and in how to teach others to…

  16. Bilingual Adult Basic Education Project. Final Report.

    ERIC Educational Resources Information Center

    Graham, Janet Roth

    The Bilingual Adult Basic Education Project provided bilingual life skills instruction, counseling, and informational services to approximately 150 non-English-dominant adults across Pennsylvania by means of contracts to local education agencies. Students were pre- and post-tested in English and/or their native language to measure their growth in…

  17. A Family Literacy Project. Final Report.

    ERIC Educational Resources Information Center

    Cleveland Public Schools, OH. Office of Adult and Continuing Education.

    The Cleveland Public Schools developed a family literacy program to address the needs of both parent and child and attempt to break the cycle of illiteracy. Fifty parents who were Job Training Partnership Act (JTPA)-eligible participated in the project. They attended one of four 9-week sessions. Course content included literacy, preemployment and…

  18. Project LECA Final Report, 1973-74.

    ERIC Educational Resources Information Center

    Valdes, Plano B., Jr.; Hardcastle, Mia

    Project LECA (Local Environment in III Century America) was designed by Hillsborough Community College as a 10-month series of seminars, forums, speeches, public debate, and other events on environmental concerns that affect the nation, state, and the Tampa Bay Area. In all, 2,380 persons have participated directly in the LECA programs held, which…

  19. Hartford Labor Mobility Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    Connecticut State Dept. of Public Welfare, Hartford.

    The project was an effort to relocate unemployed and underemployed persons, predominantly Negroes and Puerto Ricans, from the ghetto to the suburbs to learn whether job finding assistance, counseling and relocation could enable families with an able-bodied wage earner to get off welfare rolls. (NTIS)

  20. Yaqui Parent Education Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    de Campoy, Antonia

    The Yaqui Parent Education Demonstration Project was founded in 1975 with the aid of Maricopa County Head Start in Guadalupe, Arizona, to help foster the continuation of the Yaqui language, history, and culture. With a 1-year grant from the Department of Health, Education, and Welfare/Office of Child Development, organizers hired a coordinator,…

  1. NORCAL Project: Phase I. Final Report.

    ERIC Educational Resources Information Center

    MacMillan, Thomas F.

    Phase I of Northern California Cooperative Research Project on Student Withdrawals (NORCAL) examined withdrawal and continuing students in 23 colleges, evaluated the data, predicted potential withdrawals, and summarized findings. A questionnaire was used to help develop a model to predict attrition within the first term of enrollment. The junior…

  2. Occupational Competence Access Project. Final Report.

    ERIC Educational Resources Information Center

    Post, John O., Jr.

    The Occupational Competence Access Project (OCAP) was conducted to facilitate student access to (1) occupational opportunities through the provision of a guidance system incorporating student capabilities; (2) occupational opportunities through the provision of industrially validated exploratory programs in occupational preparation; and (3)…

  3. Minewater heat recovery project. Final Technical report

    SciTech Connect

    1992-04-01

    This report consists of three sections: (1) Design, experimental testing and performance analysis of the 20-ft long DBHE (Downhole Bundle Heat Exchanger); (2) Modified design of mine water heat exchanger; and (3) Performance tests on mine water heat exchanger. Appendices summarize design calculations, discuss the scope of the work tasks, and present a diary of the progress throughout the research and development project.

  4. Physically Handicapped in Science: Final Project Report.

    ERIC Educational Resources Information Center

    O'Brien, Maureen B.; And Others

    A two-year project was conducted by St. Mary's Junior College to improve the science literacy of visually-impaired students (VIS) through the adaptation of instructional methods and materials. A four-step process was used: (1) learning materials were reviewed to identify problem areas; (2) preliminary adaptations were made based on the review; (3)…

  5. ADD Teacher Inservice Project. Final Grant Report.

    ERIC Educational Resources Information Center

    Edwards, Mark C.; Schulz, Eldon G.

    The report describes activities and achievements of the Attention Deficit Disorder (ADD) Teacher Inservice Project. The inservice program was developed using a formal process to identify the critical issues related to ADD awareness, assessment, and intervention. Program content was designed to address critical issues identified in the research…

  6. The Sesame Mother Project. Final Report.

    ERIC Educational Resources Information Center

    Filep, Robert T.; And Others

    The main objective of the Sesame Mother Pilot Project was to increase the effectiveness of the television program with preschool children in densely populated, low-income, inner-city areas. Volunteer Mothers selected from the inner-city areas of Los Angeles and Chicago were trained to conduct viewing sessions in their own homes. Following the…

  7. Hartford Labor Mobility Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    Connecticut State Dept. of Public Welfare, Hartford.

    The project was an effort to relocate unemployed and underemployed persons, predominantly Negroes and Puerto Ricans, from the ghetto to the suburbs to learn whether job finding assistance, counseling and relocation could enable families with an able-bodied wage earner to get off welfare rolls. (NTIS)

  8. Coal Manpower Projections: 1980. Final Report.

    ERIC Educational Resources Information Center

    Clague, Ewan

    The National Petroleum Council has projected a 1980 bituminous coal production of 910 million tons. On that basis, the study estimates the manpower which will be required to produce that volume of coal. On the assumption of a productivity increase of two percent per year from 1974 onwards, the 1980 coal output will require a work force of…

  9. Workplace Skills Enhancement Project. Final Report.

    ERIC Educational Resources Information Center

    Seattle-King County Private Industry Council, Seattle, WA.

    The Workplace Skills Enhancement Project was provided by the Seattle-King County Private Industry Council in Partnership with the Employment Opportunities Center and the Refugee Federation Service Center. Of the 150 participants in the program, 137 were Asian. Workplace literacy training was generally advertised as a voluntary program available to…

  10. HOME HEALTH AIDE TRAINING PROJECT. FINAL REPORT.

    ERIC Educational Resources Information Center

    Greater New Haven Community Council, CT.

    THE HOME HEALTH AIDE PERFORMS SIMPLE PERSONAL CARE FUNCTIONS UNDER NURSING SUPERVISION IN THE HOME CARE OF AN ILL OR DISABLED PERSON. THE PROJECT OBJECTIVES WERE TO TRAIN AS AIDES 30 MEN AND WOMEN AGE 45 YEARS AND OLDER WITH LIMITED INCOMES TO MEET A COMMUNITY EMPLOYMENT NEED AND TO EXPERIMENT IN RECRUITMENT, SELECTION, TRAINING, AND EMPLOYMENT…

  11. The Final Report: AACJC Paralegal Project

    ERIC Educational Resources Information Center

    Skaggs, Kenneth G.

    1978-01-01

    Describes the growing awareness of the need for legal assistants which lead to the American Association of Community and Junior Colleges' paralegal education project, whose primary purpose was to develop, implement, and evaluate associate degree, certificate, and continuing education paralegal programs at six community colleges. (TP)

  12. Appalachian Employability Skills Project. Final Report.

    ERIC Educational Resources Information Center

    Eyster, George; And Others

    A Morehead State University project field tested the feasibility and utility of a comprehensive vocational training program, the Employability Skills Series of the Adkin Life Skills Program. The study involved nine adult program sites at these levels: adult education/GED (General Education Development training) students, post-GED CETA…

  13. Prototype Schools Project. Final Technical Report.

    ERIC Educational Resources Information Center

    Houston Independent School District, TX.

    The Prototype Schools Project endeavored to design and disseminate an inservice program to expedite and facilitate desegregation in the Houston Independent School District. A ratio of 35 percent Negro to 65 percent white teachers was accomplished, or vice versa, as the individual school situation indicated. The six pilot schools in the program…

  14. Trucking Industry Training Project. Final Report.

    ERIC Educational Resources Information Center

    Sanburn, Donald D.

    The report was prepared under a grant made to investigate the possibilities of establishing an organized system of training for the trucking industry. It discusses attempts to disseminate information on training, learned through operation of an experimental and demonstration project in Pico Rivera, California. It discusses problems of compliance…

  15. Project Ta-kos Outreach. Final Report.

    ERIC Educational Resources Information Center

    Askew, Linda; And Others

    The Project Ta-kos Outreach program is an inservice training model designed to increase the probability that children (ages birth to 8) at risk for or with special needs and their families can access and receive appropriate services in order to remain an integral part of the community in which they reside. The program reflects an ecological…

  16. Southeast geysers effluent pipeline project. Final report

    SciTech Connect

    Dellinger, M.

    1998-01-15

    The project concept originated in 1990 with the convergence of two problems: (1) a need for augmented injection to mitigate declining reservoir productivity at the Geysers; and (2) a need for a new method of wastewater disposal for Lake County communities near the The Geysers. A public/private partnership of Geysers operators and the Lake County Sanitation District (LACOSAN) was formed in 1991 to conduct a series of engineering, environmental, and financing studies of transporting treated wastewater effluent from the communities to the southeast portion of The Geysers via a 29-mile pipeline. By 1994, these evaluations concluded that the concept was feasible and the stakeholders proceeded to formally develop the project, including pipeline and associated facilities design; preparation of an environmental impact statement; negotiation of construction and operating agreements; and assembly of $45 million in construction funding from the stakeholders, and from state and federal agencies with related program goals. The project development process culminated in the system`s dedication on October 16, 1997. As of this writing, all project components have been constructed or installed, successfully tested in compliance with design specifications, and are operating satisfactorily.

  17. Visual Response System Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    Heward, William L.

    The report details development and implementation of a project to use the visual response system (VRS) to aid the mainstreaming of mildly handicapped students. The VRS uses overhead projectors, individual earphones, and other hardware at each student's desk so that students can respond to teacher presentations. The advantages are listed for the…

  18. The UIC Therapeutic Partnership Project. Final Report.

    ERIC Educational Resources Information Center

    Lawlor, Mary C.; Cada, Elizabeth A.

    This interdisciplinary inservice training project at the University of Illinois at Chicago was designed to improve early childhood occupational and physical therapy services by developing, implementing, evaluating, and disseminating a comprehensive training model. The competency-based program was designed to address the developmental needs of…

  19. Emergency Medical Services. Final Project Report.

    ERIC Educational Resources Information Center

    Huff, Hugh; Caltagirone, Norma

    This report presents the procedures and activities of a year-long Public Education Project conducted in Region J of North Carolina to help citizens of this region learn what Emergency Medical Services (EMS) are available, how to obtain them, and when to call upon them. Previous reports provide the sampling methodology used to survey the…

  20. The MARC Pilot Project. Final Report.

    ERIC Educational Resources Information Center

    Avram, Henriette D.

    The MARC Pilot Project was an experiment conducted by the Library of Congress, in cooperation with 16 participating libraries, to determine the feasibility of putting cataloging data into machine-readable from for distribution of magnetic tapes. MARC (Machine Readable Cataloging) records were distributed for some 16,000 titles in the pilot phase…

  1. Project Step Ahead. Final Performance Report.

    ERIC Educational Resources Information Center

    New Mexico State Univ., Las Cruces. Dept. of English.

    This report describes a National Workplace Literacy Demonstration project that provided onsite training at participating New Mexico hospitals in job-specific literacy skills necessary for satisfactory job performance. Six courses were offered that integrated language skills with reading, writing, and speaking components--Straight Talk:…

  2. Labor Exchange Skills Project. Final Report.

    ERIC Educational Resources Information Center

    Dietrich, Eleanor; Hendrickson-Larson, Joanna; Hoppe, Ruth; Paige, Bruce; Rosenow, Steve

    The Labor Exchange Skills Project, which was conducted under the sponsorship and direction of the U.S. Department of Labor, Employment and Training Administration, was designed to develop a labor exchange skills database (ETA) that would improve the usability of many Department of Labor applications and products developed by other public and…

  3. Vermont gasifier project. Final report, Phase I

    SciTech Connect

    1995-07-01

    This report presents an engineering status report for the Vermont gasifier project. Technical areas of concern are discussed with the cyclone performance, agglomeration problems in the combustor, particlate emissions, valve design, deflagration venting, gasifier and combustion blower surge control, and other related areas. Attachments pertaining to the drawing and specification register are included.

  4. Mobilizing Adult Basic Education. Final Project Report.

    ERIC Educational Resources Information Center

    Fausto, Vincent J.

    An adult basic education (ABE) project was undertaken in 1977 in southern New Jersey to take instruction to students in rural areas. The region was one in which some 75% of the population had not completed high school. Centered in Millville with satellite centers in four rural townships whose secondary students are bussed to Millville, the project…

  5. Sociology of the Classroom Project. Final Report.

    ERIC Educational Resources Information Center

    Gold, Raymond L.

    This project formed small seminar groups of behavioral scientists and educators to study the sociology of the classroom. The groups observed classrooms in elementary schools, high schools, and universities in Montana. Library research and discussion were other methods of investigation used. It was concluded that the classroom is part of society's…

  6. Farm alcohol fuel project. Final report

    SciTech Connect

    Demmel, D.

    1981-11-15

    The Small Energy Project is a research and demonstration effort designed to assist small farmers in the utilization of energy conservation techniques on their farms. The Farm Alcohol Project was designed to demonstrate the production of alcohol fuels on small farms in order to reduce purchased liquid fuel requirements. The Project considered the use of on-farm raw materials for process heat and the production of fuel grade, low prood ethanol in volumes up to 10,000 gallons per year. The fuel would be used entirely on the farm. The approach considered low-cost systems the farmer could build himself from local resources. Various crops were considered for ethanol production. The interest in farm alcohol production reached a peak in 1980 and then decreased substantially as farmers learned that the process of alcohol production on the farm was much more complicated than earlier anticipated. Details of Alcohol Project experiences in ethanol production, primarily from corn, are included in this report. A one-bushel distillation plant was constructed as a learning tool to demonstrate the production of ethanol. The report discusses the various options in starch conversion, fermentation and distillation that can be utilized. The advantages and disavantages of atmospheric and the more complicated process of vacuum distillation are evaluated. Larger farm plants are considered in the report, although no experience in operating such plants was gained through the Project. Various precautions and other considerations are included for farm plant designs. A larger community portable distillery is also evaluated. Such a plant was considered for servicing farms with limited plant equipment. The farms serviced would perform only fermentation tasks, with the portable device performing distillation and starch conversion.

  7. Report on task assignment No. 3 for the Waste Package Project; Parts A & B, ASME pressure vessel codes review for waste package application; Part C, Library search for reliability/failure rates data on low temperature low pressure piping, containers, and casks with long design lives

    SciTech Connect

    Trabia, M.B.; Kiley, M.; Cardle, J.; Joseph, M.

    1991-07-01

    The Waste Package Project Research Team, at UNLV, has four general required tasks. Task one is the management, quality assurance, and overview of the research that is performed under the cooperative agreement. Task two is the structural analysis of spent fuel and high level waste. Task three is an American Society of Mechanical Engineers (ASME) Pressure Vessel Code review for waste package application. Finally, task four is waste package labeling. This report includes preliminary information about task three (ASME Pressure Vessel Code review for Waste package Application). The first objective is to compile a list of the ASME Pressure Vessel Code that can be applied to waste package containers design and manufacturing processes. The second objective is to explore the use of these applicable codes to the preliminary waste package container designs. The final objective is to perform a library search for reliability and/or failure rates data on low pressure, low temperature, containers and casks with long design lives.

  8. Preservation Planning Project Study Team. Final Report.

    ERIC Educational Resources Information Center

    Pittsburgh Univ., PA. Libraries.

    This final report is a product of a comprehensive 14-month Preservation Planning Program (PPP) self-study conducted by the University of Pittsburgh Libraries, working with the Association of Research Libraries' (ARL) Office of Management Studies. The PPP is designed to put self-help tools into the hands of library staff responsible for developing…

  9. Gravity packaging final waste recovery based on gravity separation and chemical imaging control.

    PubMed

    Bonifazi, Giuseppe; Serranti, Silvia; Potenza, Fabio; Luciani, Valentina; Di Maio, Francesco

    2017-02-01

    Plastic polymers are characterized by a high calorific value. Post-consumer plastic waste can be thus considered, in many cases, as a typical secondary solid fuels according to the European Commission directive on End of Waste (EoW). In Europe the practice of incineration is considered one of the solutions for waste disposal waste, for energy recovery and, as a consequence, for the reduction of waste sent to landfill. A full characterization of these products represents the first step to profitably and correctly utilize them. Several techniques have been investigated in this paper in order to separate and characterize post-consumer plastic packaging waste fulfilling the previous goals, that is: gravity separation (i.e. Reflux Classifier), FT-IR spectroscopy, NIR HyperSpectralImaging (HSI) based techniques and calorimetric test. The study demonstrated as the proposed separation technique and the HyperSpectral NIR Imaging approach allow to separate and recognize the different polymers (i.e. PolyVinyl Chloride (PVC), PolyStyrene (PS), PolyEthylene (PE), PoliEtilene Tereftalato (PET), PolyPropylene (PP)) in order to maximize the removal of the PVC fraction from plastic waste and to perform the full quality control of the resulting products, can be profitably utilized to set up analytical/control strategies finalized to obtain a low content of PVC in the final Solid Recovered Fuel (SRF), thus enhancing SRF quality, increasing its value and reducing the "final waste". Copyright © 2016 Elsevier Ltd. All rights reserved.

  10. Project Tomorrow. Special Project Performance Evaluation. Final Report.

    ERIC Educational Resources Information Center

    Northern Nevada Community Coll., Elko.

    In August 1984, Northern Nevada Community College (NNCC) began a project to develop a practical plan for a program in personal literacy to be incorporated into its Adult Basic Education Program. The first months of the project were spent in structuring the test model, developing intake procedures, research, interagency networking, and coordinating…

  11. Final performance report for Project JEM

    SciTech Connect

    McKinney, M.J.; Jenkins, S.

    1997-12-31

    Project JEM (Jarvis Enhancement of Males) is a pre-college program directed toward stimulating disadvantaged, talented African American males in grades four, five, and six to attend college and major in mathematics, science, computer science, or related technical areas needed by the US Department of Energy. Twenty young African American male students were recruited from Gladewater Independent School District (ISD), Longview ISD, Hawkins ISD, Tyler ISD, Winona ISD and big Sandy ISD. Students enrolled in the program range from ages 10 to 13 and are in grades four, five and six. Student participants in the 1997 Project JEM Program attended Saturday Academy sessions and a four week intensive, summer residential program. The information here provides a synopsis of the activities which were conducted through each program component.

  12. Klickitat Cogeneration Project : Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration; Klickitat Energy Partners

    1994-09-01

    To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).

  13. Supercompaction/grouting demonstration project: Final report

    SciTech Connect

    Not Available

    1987-01-01

    The purpose of this supercompaction demonstration project was to allow Martin Marietta Energy Systems, Inc. (The Company), to obtain cost analysis and performance information on volume reduction and waste encapsulation of solid, low-level contaminated waste (SLW). Ultimately, this information will be used to help define a waste disposal process for SLW that is acceptable to regulatory agencies and the US Department of Energy, Oak Ridge Operations (DOE/ORO). The technical objectives of the demonstration project were: (1) to obtain detailed performance data on each of the compacted barrels; (2) evaluate operating performance problems that may have occurred; (3) describe in detail the compaction and encapsulation process; and (4) to obtain operating cost data for the performance of this demonstration.

  14. Alaska Wood Biomass Energy Project Final Report

    SciTech Connect

    Jonathan Bolling

    2009-03-02

    The purpose of the Craig Wood Fired Boiler Project is to use waste wood from local sawmilling operations to provide heat to local public buildings, in an effort to reduce the cost of operating those buildings, and put to productive use a byproduct from the wood milling process that otherwise presents an expense to local mills. The scope of the project included the acquisition of a wood boiler and the delivery systems to feed wood fuel to it, the construction of a building to house the boiler and delivery systems, and connection of the boiler facility to three buildings that will benefit from heat generated by the boiler: the Craig Aquatic Center, the Craig Elementary School, and the Craig Middle School buildings.

  15. Operation Dominic. Project Stemwinder. Final report

    SciTech Connect

    Ferber, G.J.

    1985-09-01

    The objective of Project Stemwinder was to probe and sample nuclear clouds as soon as possible after cloud stabilization in order to investigate the amount of radioactive debris which stabilizes in the troposphere and its distribution with height. Sampling was accomplished by the RB-57 aircraft. The detonations investigated were all air bursts over water during Operation Dominic I at Christmas Island. Some data for surface detonations obtained by sampling aircraft during Operation Redwing are used to compare with the Stemwinder data.

  16. Confined zone dispersion project. Final technical report

    SciTech Connect

    1994-06-01

    This report describes the performance of the confined zone dispersion (CZD) flue gas desulfurization (FGD) system in removing sulfur dioxide (SO{sub 2}) from flue gas in the coal-fired boiler. The CZD-FGD system, installed at Pennsylvania Electric Company`s (Penelec`s) Seward Power Station, was designed to remove 50% of the SO{sub 2} from one-half of Unit No. 5`s flue gas when the boiler is fired with 1.5% sulfur coal. Section 1 discusses the significance of CZD, the purpose of this report, the history of the project, and the role of DOE in the project, describes the project organization, and lists the six design areas involving proprietary information. Section 2 presents project location, objectives, and phases, and discusses the test program. Section 3 explains the process flow diagram, piping and instrumentation diagrams and operating controls, site plan, equipment layouts, and process equipment. Section 4 provides an integrated discussion of all the test results obtained during the test program, backed by tabulations and graphics. Section 5 describes the testing failures and corrective actions taken. Section 6, reliability/availability/maintainability analysis data of major equipment, covers the following systems: atomizing, sootblowing, lime, flue gas, and controls and instrumentation. Section 7 summarizes the capital cost requirements for the Seward CZD demonstration unit and discusses the capital and operating costs of installing the process at plants with various unit capacities. Section 8 discusses plans to continue the CZD demonstration to achieve longer term continuous operation at SO{sub 2} removals of 50%. Section 9 presents the principal findings of the CZD demonstration and recommends additional testing.

  17. The Dust Management Project: Final Report

    NASA Technical Reports Server (NTRS)

    Hyatt, Mark J.; Straka, Sharon

    2011-01-01

    A return to the Moon to extend human presence, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth s economic sphere, will require investment in developing new technologies and capabilities to achieve affordable and sustainable human exploration. From the operational experience gained and lessons learned during the Apollo missions, conducting longterm operations in the lunar environment will be a particular challenge, given the difficulties presented by the unique physical properties and other characteristics of lunar regolith, including dust. The Apollo missions and other lunar explorations have identified significant lunar dust-related problems that will challenge future mission success. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems and human explorers. The Dust Management Project (DMP) is tasked with the evaluation of lunar dust effects, assessment of the resulting risks, and development of mitigation and management strategies and technologies related to Exploration Systems architectures. To this end, the DMP supports the overall goal of the Exploration Technology Development Program (ETDP) of addressing the relevant high priority technology needs of multiple elements within the Constellation Program (CxP) and sister ETDP projects. Project scope, approach, accomplishments, summary of deliverables, and lessons learned are presented.

  18. Baltimore residential assistance demonstration project: Final report

    SciTech Connect

    1998-09-01

    At the request of the City of Baltimore for assistance in developing the Global Action Plan (GAP) EcoTeam Program, DOE Office of Energy Efficiency and Renewable Energy provided GAP with $10,000 for a one-year demonstration project. The results of this action are as follows: four EcoTeams were established representing 28 households and 47 people; the self reported resource savings to date per household are on average: energy savings--9%, auto emission reduction--16%, solid waste reduction--52%, water savings--25%, dollar savings--$174; the initial seed team (prior to this funding) replicated and started 2 new teams, one of those teams replicated and started 2 more teams, the other team did not replicate; 4 volunteer coaches were recruited to coach each of these teams; a volunteer coordinator was recruited to provide local guidance for this demonstration project and help GAP reach out to the Fairfield low-income neighborhood, the volunteer coordinator was unable to establish any EcoTeams in this neighborhood as their priorities were establishing a neighborhood action team and addressing immediate health-related environmental issues; the volunteers have communicated information about this demonstration project among many community and Baltimore government leaders to solicit support for a full campaign and to assess the level of that support.

  19. Manzanita Hybrid Power system Project Final Report

    SciTech Connect

    Trisha Frank

    2005-03-31

    The Manzanita Indian Reservation is located in southeastern San Diego County, California. The Tribe has long recognized that the Reservation has an abundant wind resource that could be commercially utilized to its benefit, and in 1995 the Tribe established the Manzanita Renewable Energy Office. Through the U.S. Department of Energy's Tribal Energy Program the Band received funds to install a hybrid renewable power system to provide electricity to one of the tribal community buildings, the Manzanita Activities Center (MAC building). The project began September 30, 1999 and was completed March 31, 2005. The system was designed and the equipment supplied by Northern Power Systems, Inc, an engineering company with expertise in renewable hybrid system design and development. Personnel of the National Renewable Energy Laboratory provided technical assistance in system design, and continued to provide technical assistance in system monitoring. The grid-connected renewable hybrid wind/photovoltaic system provides a demonstration of a solar/wind energy hybrid power-generating project on Manzanita Tribal land. During the system design phase, the National Renewable Energy Lab estimated that the wind turbine is expected to produce 10,000-kilowatt hours per year and the solar array 2,000-kilowatt hours per year. The hybrid system was designed to provide approximately 80 percent of the electricity used annually in the MAC building. The project proposed to demonstrate that this kind of a system design would provide highly reliable renewable power for community uses.

  20. Project AIRSTREAM: Trace gas final report

    SciTech Connect

    Leifer, R

    1992-12-01

    The results of 10 years of sampling for trace gases in the upper troposphere and lower stratosphere are presented. These samples were collected under the auspices of the Atomic Energy Commission (AEC), the Energy Research and Development Administration (ERDA) and the Department of Energy (DOE). Almost 1000 whole air samples were collected during the years 1973 to 1983 under Project AIRSTREAM. Project AIRSTREAM was part of the Environmental Measurements Laboratory's (EML, at that time called the Health and Safety Laboratory/HASL) research effort to investigate the impact of the injection of radionuclides and stable compounds into the stratosphere. One or more of the following compounds were analyzed: CCl[sub 3]F, CCl[sub 2]F[sub 2], CCl[sub 4], N[sub 2]O, SF[sub 6], CO[sub 2], CH[sub 4], CH[sub 3]CCl[sub 3], and COS. Details of the Project's quality assurance program are discussed. Also included in the report are two-dimensional plots of the concentration of CCl[sub 3]F and a complete tabulation of the data.

  1. Fuel Cell Forklift Project Final Report

    SciTech Connect

    Cummings, Clifton C

    2013-10-23

    This project addresses the DOE’s priorities related to acquiring data from real-world fuel cell operation, eliminating non-technical barriers, and increasing opportunities for market expansion of hydrogen fuel cell technologies. The project involves replacing the batteries in a complete fleet of class-1 electric lift trucks at FedEx Freight’s Springfield, MO parcel distribution center with 35 Plug Power GenDrive fuel cell power units. Fuel for the power units involves on-site hydrogen handling and dispensing equipment and liquid hydrogen delivery by Air Products. The project builds on FedEx Freight’s previous field trial experience with a handful of Plug Power’s GenDrive power units. Those trials demonstrated productivity gains and improved performance compared to battery-powered lift trucks. Full lift truck conversion at our Springfield location allows us to improve the competitiveness of our operations and helps the environment by reducing greenhouse gas emissions and toxic battery material use. Success at this distribution center may lead to further fleet conversions at some of our distribution centers.

  2. DOE-EPSCOR SPONSORED PROJECT FINAL REPORT

    SciTech Connect

    Zhu, Jianting

    2010-03-11

    Concern over the quality of environmental management and restoration has motivated the model development for predicting water and solute transport in the vadose zone. Soil hydraulic properties are required inputs to subsurface models of water flow and contaminant transport in the vadose zone. Computer models are now routinely used in research and management to predict the movement of water and solutes into and through the vadose zone of soils. Such models can be used successfully only if reliable estimates of the soil hydraulic parameters are available. The hydraulic parameters considered in this project consist of the saturated hydraulic conductivity and four parameters of the water retention curves. To quantify hydraulic parameters for heterogeneous soils is both difficult and time consuming. The overall objective of this project was to better quantify soil hydraulic parameters which are critical in predicting water flows and contaminant transport in the vadose zone through a comprehensive and quantitative study to predict heterogeneous soil hydraulic properties and the associated uncertainties. Systematic and quantitative consideration of the parametric heterogeneity and uncertainty can properly address and further reduce predictive uncertainty for contamination characterization and environmental restoration at DOE-managed sites. We conducted a comprehensive study to assess soil hydraulic parameter heterogeneity and uncertainty. We have addressed a number of important issues related to the soil hydraulic property characterizations. The main focus centered on new methods to characterize anisotropy of unsaturated hydraulic property typical of layered soil formations, uncertainty updating method, and artificial neural network base pedo-transfer functions to predict hydraulic parameters from easily available data. The work also involved upscaling of hydraulic properties applicable to large scale flow and contaminant transport modeling in the vadose zone and

  3. 23 CFR 661.27 - What does a complete application package for construction consist of and how does the project...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... ROAD BRIDGE PROGRAM § 661.27 What does a complete application package for construction consist of and how does the project receive funding? (a) A complete application package for construction consists of... construction consist of and how does the project receive funding? 661.27 Section 661.27 Highways FEDERAL...

  4. 23 CFR 661.27 - What does a complete application package for construction consist of and how does the project...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ROAD BRIDGE PROGRAM § 661.27 What does a complete application package for construction consist of and how does the project receive funding? (a) A complete application package for construction consists of... construction consist of and how does the project receive funding? 661.27 Section 661.27 Highways FEDERAL...

  5. A Recruitment Package for Postsecondary Vocational Education. Final From August 1, 1983 to August 31, 1984. Final Report.

    ERIC Educational Resources Information Center

    Waltz, Freddie C.; And Others

    This recruitment package consists of materials designed to assist those individuals who are responsible for recruiting students into postsecondary vocational education programs. The package, which may be used either as a guide to establishing and implementing a new promotional policy or as a resource to use when planning a specific promotional…

  6. Performance oriented packaging report for fuse, blasting, time, M700. Final report

    SciTech Connect

    Sniezek, F.M.

    1992-11-02

    This POP report is for the Fuse, Blasting, Time, M700 which is packaged 4000 feet/ Mil-B-2427 wood box. This report describes the results of testing conducted on a similar packaging which is used as an analogy for this item....Performance oriented packaging, POP, Fuse, Blasting, Time, M700, Mil-B-2427 Wood box.

  7. Combined Final Report for Colony II Project

    SciTech Connect

    Kale, Laxmikant; Jones, Terry; Moreira, Jose

    2013-10-23

    (This report was originally submmited by the lead PI (Terry Jones, ORNL) on October 22, 2013 to the program manager, Lucy Nowell. It is being submitted from University of Illinois in accordance with instructions). HPC Colony II seeks to provide portable performance for leadership class machines. Our strategy is based on adaptive system software that aims to make the intelligent decisions necessary to allow domain scientists to safely focus on their task at hand and allow the system software stack to adapt their application to the underlying architecture. This report describes the research undertaken towards these objectives and the results obtained over the performance period of the project.

  8. Final Report. Montpelier District Energy Project

    SciTech Connect

    Baker, Jessie; Motyka, Kurt; Aja, Joe; Garabedian, Harold T.

    2015-03-30

    The City of Montpelier, in collaboration with the State of Vermont, developed a central heat plant fueled with locally harvested wood-chips and a thermal energy distribution system. The project provides renewable energy to heat a complex of state buildings and a mix of commercial, private and municipal buildings in downtown Montpelier. The State of Vermont operates the central heat plant and the system to heat the connected state buildings. The City of Montpelier accepts energy from the central heat plant and operates a thermal utility to heat buildings in downtown Montpelier which elected to take heat from the system.

  9. Fairbanks Geothermal Energy Project Final Report

    SciTech Connect

    Karl, Bernie

    2013-05-31

    The primary objective for the Fairbanks Geothermal Energy Project is to provide another source of base-load renewable energy in the Fairbanks North Star Borough (FNSB). To accomplish this, Chena Hot Springs Resort (Chena) drilled a re-injection well to 2700 feet and a production well to 2500 feet. The re-injection well allows a greater flow of water to directly replace the water removed from the warmest fractures in the geothermal reservoir. The new production will provide access to warmer temperature water in greater quantities.

  10. Cryogenic Barrier Demonstration Project. Final report

    SciTech Connect

    Johnson, L.A.; Yarmak, E.; Long, E.L.

    2000-03-01

    A long-term frozen soil barrier was implemented at the HRE (Homogeneous Reactor Experiment) Pond facility at the Oak Ridge National Laboratory in 1997. This was performed to verify the technical feasibility and costs of deploying a frozen barrier at a radiologically contaminated site. Work began in September 1996 and progressed through to December 1999. The frozen barrier has been operational since November 1997. Verification of the barrier integrity was performed independently by the EPA's SITE Program. This project showed frozen barriers offer a proven technology to retain below grade hazardous substances at relatively low costs with minimal effect on the environment.

  11. Society of Mind project. Final report

    SciTech Connect

    Minsky, M.

    1988-08-01

    This project was concerned with developing a theory of intelligent thinking and learning, based on the Society of Mind model of intelligence. The research was funded over a period of years by the Computer Science Office of the Office of Naval Research. The research included the following specific subjects: Connectionism of Parallel Computers, Exploiting Parallel Processing, Connectedness of Commonsense Knowledge Bases, Connectedness and Society of Mind, Advantages and Deficiencies of Connectionist Networks, Insulation and Interaction, Learning and Representation, Intermediate Units and Significance, Associations and Connections, Unifying Frames and K-lines, Clarifying Conceptual Dependency, Computational linguistics, Research tools for society of mind models, Discovery processes, and Bridges between symbolic and connectionist models.

  12. Raft River aquaculture project. Final report

    SciTech Connect

    Beleau, M.H.; Woiwode, J.G.

    1980-07-01

    The commercial potential for geothermal aquaculture was evaluated for 2 years at the Department of Energy's Raft River geothermal site in southcentral Idaho. Common carp '(Cyprinus carpio) and channel catfish (Ictalurus punctatus) were selected as culture species. Objectives of the study included investigation of: (1) growth rates; (2) nutrition trials; (3) histological and physiological parameters; (4) bioaccumulation of heavy metals; and (5) reproductive capacity. The second year project efforts were primarily studying the effects of geothermal water on the reproductive capacity of common carp by: (1) determining the effects of geothermal water on gonadal development of common carp; and (2) determining the effects of geothermal water on common carp embryogenesis.

  13. Emergency Fish Restoration Project; Final Report 2002.

    SciTech Connect

    LeCaire, Richard

    2003-03-01

    Lake Roosevelt is a 151-mile impoundment created by the construction of Grand Coulee Dam during the early 1940's. The construction of the dam permanently and forever blocked the once abundant anadromous fish runs to the upper Columbia Basin. Since the construction of Grand Coulee Dam in 1943 and Chief Joseph Dam in 1956 this area is known as the blocked area. The blocked area is totally dependant upon resident fish species to provide a subsistence, recreational and sport fishery. The sport fishery of lake Roosevelt is varied but consists mostly of Rainbow trout (Oncorhynchus mykiss), Kokanee salmon (Oncorhynchus nerka), Walleye (Stizostedion vitreum) Small mouth bass (Micropterus dolomieui) and white sturgeon (Acipenser transmontanus). Currently, Bonneville Power Administration funds and administers two trout/kokanee hatcheries on Lake Roosevelt. The Spokane Tribe of Indians operates one hatchery, the Washington Department of Fish and Wildlife the other. In addition to planting fish directly into Lake Roosevelt, these two hatcheries also supply fish to a net pen operation that also plants the lake. The net pen project is administered by Bonneville Power funded personnel but is dependant upon volunteer labor for daily feeding and monitoring operations. This project has demonstrated great success and is endorsed by the Colville Confederated Tribes, the Spokane Tribe of Indians, the Washington Department of Fish and Wildlife, local sportsmen associations, and the Lake Roosevelt Forum. The Lake Roosevelt/Grand Coulee Dam area is widely known and its diverse fishery is targeted by large numbers of anglers annually to catch rainbow trout, kokanee salmon, small mouth bass and walleye. These anglers contribute a great deal to the local economy by fuel, grocery, license, tackle and motel purchases. Because such a large portion of the local economy is dependant upon the Lake Roosevelt fishery and tourism, any unusual operation of the Lake Roosevelt system may have a

  14. Biorefinery Demonstration Project Final Progress Report

    SciTech Connect

    Lee, David

    2015-10-20

    In this project we focused on various aspects of biorefinery technology development including algal-biorefinery technology, thermochemical conversion of biomass to bio-oils and biochar; we tested characteristics and applications of biochars and evaluated nutrient cycling with wastewater treatment by the coupling of algal culture systems and anaerobic digestion. Key results include a method for reducing water content of bio-oil through atomized alcohol addition. The effect included increasing the pH and reducing the viscosity and cloud point of the bio-oil. Low input biochar production systems were evaluated via literature reviews and direct experimental work. Additionally, emissions were evaluated and three biochar systems were compared via a life cycle analysis. Attached growth systems for both algal cultivation and algal harvesting were found to be superior to suspended growth cultures. Nutrient requirements for algal cultivation could be obtained by the recycling of anaerobic digester effluents, thus experimentally showing that these two systems could be directly coupled. Twenty-two journal articles and six intellectual property applications resulted from the cumulative work that this project contributed to programmatically.

  15. Solar Total Energy Project final test report

    SciTech Connect

    Nelson, R.F.; Abney, L.O.; Towner, M.L. )

    1990-09-01

    The Solar Total Energy Project (STEP), a cooperative effort between the United States Department of Energy (DOE) and Georgia Power Company (GPC) located at Shenandoah, Georgia, has undergone several design modifications based on experience from previous operations and test programs. The experiences encountered were discussed in detail in the Solar Total Energy Project Summary Report'' completed in 1987 for DOE. Most of the proposed changes discussed in this report were installed and tested in 1987 as part of two 15-day test programs (SNL Contract No. 06-3049). However, several of the suggested changes were not completed before 1988. These plant modifications include a new distributed control system for the balance of plant (BOP), a fiber a optical communications ring for the field control system, and new control configuration reflecting the new operational procedures caused by the plant modifications. These modifications were tested during a non-consecutive day test, and a 60-day field test conducted during the autumn of 1989. These test were partially funded by SNL under Contract No. 42-4859, dated June 22, 1989. Results of these tests and preliminary analysis are presented in this test summary report. 9 refs., 19 figs., 7 tabs.

  16. Final rapid reactivation project environmental assessment

    SciTech Connect

    1999-02-10

    The US Department of Energy (DOE) has prepared an environmental assessment (EA) for the Rapid Reactivation Project at Sandia National Laboratories, New Mexico. The EA analyzes the potential effects of a proposal to increase production of neutron generators from the current capability of 600 units per year up to 2,000 units per year. The project would use existing buildings and infrastructure to the maximum extent possible to meet the additional production needs. The increased production levels would necessitate modifications and additions involving a total area of approximately 26,290 gross square feet at Sandia National Laboratories, New Mexico, Technical Area 1. Additional production equipment would be procured and installed. The no-action alternative would be to continue production activities at the current capability of 600 units per year. The EA analyzes effects on health, safety, and air quality, resulting from construction and operation and associated cumulative effects. A detailed description of the proposed action and its environmental consequences is presented in the EA.

  17. Final Project Report Project 10749-4.2.2.1 2007-2009

    SciTech Connect

    Zacher, Alan H.; Holladay, Johnathan E.; Frye, J. G.; Brown, Heather M.; Santosa, Daniel M.; Oberg, Aaron A.

    2009-05-11

    This is the final report for the DOE Project 10749-4.2.2.1 for the FY2007 - FY2009 period. This report is non-proprietary, and will be submitted to DOE as a final project report. The report covers activities under the DOE Project inside CRADA 269 (Project 53231) as well as project activites outside of that CRADA (Project 56662). This is the final report that is summarized from the non-proprietary quarterlies submitted to DOE over the past 2.5 years, which in turn are summaries from the proprietary technical reporting to UOP.

  18. Blade Manufacturing Improvement Project: Final Report

    SciTech Connect

    SHERWOOD, KENT

    2002-10-01

    The Blade Manufacturing Improvement Project explores new, unique and improved materials integrated with innovative manufacturing techniques that promise substantial economic enhancements for the fabrication of wind turbine blades. The primary objectives promote the development of advanced wind turbine blade manufacturing in ways that lower blade costs, cut rotor weight, reduce turbine maintenance costs, improve overall turbine quality and increase ongoing production reliability. Foam Matrix (FMI) has developed a wind turbine blade with an engineered foam core, incorporating advanced composite materials and using Resin Transfer Molding (RTM) processes to form a monolithic blade structure incorporating a single molding tool. Patented techniques are employed to increase blade load bearing capability and insure the uniform quality of the manufactured blade. In production quantities, FMI manufacturing innovations may return a sizable per blade cost reduction when compared to the cost of producing comparable blades with conventional methods.

  19. Advanced Blade Manufacturing Project - Final Report

    SciTech Connect

    POORE, ROBERT Z.

    1999-08-01

    The original scope of the project was to research improvements to the processes and materials used in the manufacture of wood-epoxy blades, conduct tests to qualify any new material or processes for use in blade design and subsequently build and test six blades using the improved processes and materials. In particular, ABM was interested in reducing blade cost and improving quality. In addition, ABM needed to find a replacement material for the mature Douglas fir used in the manufacturing process. The use of mature Douglas fir is commercially unacceptable because of its limited supply and environmental concerns associated with the use of mature timber. Unfortunately, the bankruptcy of FloWind in June 1997 and a dramatic reduction in AWT sales made it impossible for ABM to complete the full scope of work. However, sufficient research and testing were completed to identify several promising changes in the blade manufacturing process and develop a preliminary design incorporating these changes.

  20. Physics of Correlated Systems, Final Project Report

    SciTech Connect

    Greene, Chris H.

    2014-06-25

    The funding of this DOE project has enabled the P.I. and his collaborators to tackle a number of problems involving nonperturbatively coupled atomic systems, including their interactions with each other and/or with an external electromagnetic field of the type provided by either a continuous-wave or a femtosecond short-pulse laser. The progress includes a new, deeper understanding of an old and famous theory of autoionization lineshapes, developed initially by Ugo Fano in 1935 and later extended in a highly cited 1961 article; the new result specifically is that in a collaboration with the Heidelberg group we have been able to demonstrate an unexpectedly simple behavior in the time domain that is relevant for modern short-pulse lasers. This study also demonstrates a way to modify and even control the lineshapes of unstable atomic and molecular energy levels.

  1. Yakima Fisheries Project : Final Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration; Washington . Dept. of Fish and Wildlife; Confederated Tribes and Bands of the Yakama Nation, Washington.

    1996-01-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. These activities, known as the Yakima Fisheries Project (YFP), would be jointly managed by the State of Washington and the Yakima Indian Nation. The YFP is included in the Northwest Power Planning Council`s (Council`s) fish and wildlife program. The Council selected the Yakima River system for attention because fisheries resources are severely reduced from historical levels and because there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) die construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. Examined in addition to No Action are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of reestablishing naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 is the preferred action. A central hatchery would be built for either alternative, as well as three sites with six raceways each for acclimation and release of spring chinook smolts. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

  2. Teacher Education Improvement Project 1985-1986. Final Project Report.

    ERIC Educational Resources Information Center

    Grambling State Univ., LA. Coll. of Education.

    The purpose of the Teacher Education Improvement Project at Grambling State University (Louisiana) was to document the change processes and products the institution used to improve performance of prospective teachers. The intent was to validate the effectiveness of planned programs of change in five areas: student assessment; faculty development;…

  3. Edible Landscape Project: final project report for DOE grant

    SciTech Connect

    Coates, G.

    1984-01-01

    Edible landscaping is an approach to urban agriculture using yards, rooftops, patios, vacant lots, and greenhouses. Project activities are reviewed, both demonstration and educational. Included is Edible Landscaping in Kansas, a 43 page booklet which includes background information, a case study description of the University For Man demonstration landscape, and encyclopedia of edible plants, and an annotated bibliography. (MHR)

  4. WSF Biodiesel Demonstration Project Final Report

    SciTech Connect

    Washington State University; University of Idaho; The Glosten Associates, Inc.; Imperium Renewables, Inc.

    2009-04-30

    In 2004, WSF canceled a biodiesel fuel test because of “product quality issues” that caused the fuel purifiers to clog. The cancelation of this test and the poor results negatively impacted the use of biodiesel in marine application in the Pacific Northwest. In 2006, The U.S. Department of Energy awarded the Puget Sound Clean Air Agency a grant to manage a scientific study investigating appropriate fuel specifications for biodiesel, fuel handling procedures and to conduct a fuel test using biodiesel fuels in WSF operations. The Agency put together a project team comprised of experts in fields of biodiesel research and analysis, biodiesel production, marine engineering and WSF personnel. The team reviewed biodiesel technical papers, reviewed the 2004 fuel test results, designed a fuel test plan and provided technical assistance during the test. The research reviewed the available information on the 2004 fuel test and conducted mock laboratory experiments, but was not able to determine why the fuel filters clogged. The team then conducted a literature review and designed a fuel test plan. The team implemented a controlled introduction of biodiesel fuels to the test vessels while monitoring the environmental conditions on the vessels and checking fuel quality throughout the fuel distribution system. The fuel test was conducted on the same three vessels that participated in the canceled 2004 test using the same ferry routes. Each vessel used biodiesel produced from a different feedstock (i.e. soy, canola and yellow grease). The vessels all ran on ultra low sulfur diesel blended with biodiesel. The percentage of biodiesel was incrementally raised form from 5 to 20 percent. Once the vessels reached the 20 percent level, they continued at this blend ratio for the remainder of the test. Fuel samples were taken from the fuel manufacturer, during fueling operations and at several points onboard each vessel. WSF Engineers monitored the performance of the fuel systems and

  5. Helical Screw Expander Evaluation Project. Final report

    SciTech Connect

    McKay, R.

    1982-03-01

    A functional 1-MW geothermal electric power plant that featured a helical screw expander was produced and then tested in Utah in 1978 to 1979 with a demonstrated average performance of approximately 45% machine efficiency over a wide range of test conditions in noncondensing operation on two-phase geothermal fluids. The Project also produced a computer-equipped data system, an instrumentation and control van, and a 1000-kW variable load bank, all integrated into a test array designed for operation at a variety of remote test sites. Additional testing was performed in Mexico in 1980 under a cooperative test program using the same test array, and machine efficiency was measured at 62% maximum with the rotors partially coated with scale, compared with approximately 54% maximum in Utah with uncoated rotors, confirming the importance of scale deposits within the machine on performance. Data are presented for the Utah testing and for the noncondensing phases of the testing in Mexico. Test time logged was 437 hours during the Utah tests and 1101 hours during the Mexico tests.

  6. Aerogel commercialization pilot project. Final program report

    SciTech Connect

    1996-02-13

    Aerogels are extremely light weight, high surface area, very insulative materials that offer many potential improvements to commercial products. Aerogels have been the subject of extensive research at Department of Energy Laboratories and have been considered one of the technology most ready for commercialization. However, commercialization of the technology had been difficult for the National Laboratories since end users were not interested in the high temperature and high pressure chemical processes involved in manufacturing the raw material. Whereas, Aerojet as a supplier of rocket fuels, specialty chemicals and materials had the manufacturing facilities and experience to commercially produce aerogel-type products. Hence the TRP provided a link between the technology source (National Laboratories), the manufacturing (Aerojet) and the potential end users (other TRP partners). The program successfully produced approximately 500 ft{sup 2} of organic aerogel but failed to make significant quantities of silica aerogel. It is significant that this production represents both the largest volume and biggest pieces of organic aerogel ever produced. Aerogels, available from this program, when tested in several prototype commercial products were expected to improve the products performance, but higher than expected projected production costs for large scale manufacture of aerogels has limited continued commercial interest from these partners. Aerogels do, however, offer potential as a specialty material for some high value technology and defense products.

  7. Baltimore Zoo digester project. Final report. [Elephants

    SciTech Connect

    Gibson, P.W.

    1980-01-01

    The results of a project to produce methane using the manure from zoo animals as a feedstock is presented. Two digesters are in operation, the first (built in 1974) utilizing wastes from the Hippo House and a second (built in 1980) utilizing wastes from the Elephant House. Demonstrations on the utilization of the gas were performed during zoo exhibits. The Elephant House Digester has a capacity of 4200 gallons and a floating gas dome which can retain at least 150 cu ft of gas. Solar energy has been incorporated into the design to maintain digester temperature at 95/sup 0/F. The system produces 50 cu ft per day. After cleaning the gas, it is used to generate electricity to power an electric light, a roof fan, and an air conditioner. The gas is also used to operate a gas range and a gas lamp. During the opening day exhibit, 50 meals were cooked using the bio-gas from just 2 elephants. (DMC)

  8. SMAP Verification and Validation Project - Final Report

    NASA Technical Reports Server (NTRS)

    Murry, Michael

    2012-01-01

    In 2007, the National Research Council (NRC) released the Decadal Survey of Earth science. In the future decade, the survey identified 15 new space missions of significant scientific and application value for the National Aeronautics and Space Administration (NASA) to undertake. One of these missions was the Soil Moisture Active Passive (SMAP) mission that NASA assigned to the Jet Propulsion Laboratory (JPL) in 2008. The goal of SMAP1 is to provide global, high resolution mapping of soil moisture and its freeze/thaw states. The SMAP project recently passed its Critical Design Review and is proceeding with its fabrication and testing phase.Verification and Validation (V&V) is widely recognized as a critical component in system engineering and is vital to the success of any space mission. V&V is a process that is used to check that a system meets its design requirements and specifications in order to fulfill its intended purpose. Verification often refers to the question "Have we built the system right?" whereas Validation asks "Have we built the right system?" Currently the SMAP V&V team is verifying design requirements through inspection, demonstration, analysis, or testing. An example of the SMAP V&V process is the verification of the antenna pointing accuracy with mathematical models since it is not possible to provide the appropriate micro-gravity environment for testing the antenna on Earth before launch.

  9. SMAP Verification and Validation Project - Final Report

    NASA Technical Reports Server (NTRS)

    Murry, Michael

    2012-01-01

    In 2007, the National Research Council (NRC) released the Decadal Survey of Earth science. In the future decade, the survey identified 15 new space missions of significant scientific and application value for the National Aeronautics and Space Administration (NASA) to undertake. One of these missions was the Soil Moisture Active Passive (SMAP) mission that NASA assigned to the Jet Propulsion Laboratory (JPL) in 2008. The goal of SMAP1 is to provide global, high resolution mapping of soil moisture and its freeze/thaw states. The SMAP project recently passed its Critical Design Review and is proceeding with its fabrication and testing phase.Verification and Validation (V&V) is widely recognized as a critical component in system engineering and is vital to the success of any space mission. V&V is a process that is used to check that a system meets its design requirements and specifications in order to fulfill its intended purpose. Verification often refers to the question "Have we built the system right?" whereas Validation asks "Have we built the right system?" Currently the SMAP V&V team is verifying design requirements through inspection, demonstration, analysis, or testing. An example of the SMAP V&V process is the verification of the antenna pointing accuracy with mathematical models since it is not possible to provide the appropriate micro-gravity environment for testing the antenna on Earth before launch.

  10. bayesTFR: An R Package for Probabilistic Projections of the Total Fertility Rate.

    PubMed

    Ševčíková, Hana; Alkema, Leontine; Raftery, Adrian E

    2011-07-01

    The bayesTFR package for R provides a set of functions to produce probabilistic projections of the total fertility rate (TFR) for all countries. In the model, a random walk with drift is used to project the TFR during the fertility transition, using a Bayesian hierarchical model to estimate the parameters of the drift term. The TFR is modeled with a first order autoregressive process during the post-transition phase. The computationally intensive part of the projection model is a Markov chain Monte Carlo algorithm for estimating the parameters of the drift term. This article summarizes the projection model and describes the basic steps to generate probabilistic projections, as well as other functionalities such as projecting aggregate outcomes and dealing with missing values.

  11. HIP densification project. Final CRADA report

    SciTech Connect

    Franco-Ferreira, E.A.; Finkelstein, W.

    1997-08-29

    An investigation was conducted to evaluate the use of HIPed aluminum castings as near-net-shape blanks for large electrostatic focusing electrodes in ion lithography machines. The electrodes must have very smooth finishes which are free of pores and other defects. This has heretofore been achieved by rough-machining the blanks out of large forged aluminum billets and final diamond-turning. The use of a near-net-shape casting for the blank was expected to save a significant amount of money and time. The test was conducted on a single cast blank which was supplied by the Partner in the HIPed and stress relieved condition. Rough machining and diamond turning operations conducted by LMES/ER revealed that the casting contained unacceptably large defects. The conclusion was reached that HIPed aluminum castings in the large sizes and of the quality levels required would probably be unobtainable in a cost-effective manner. An alternative approach, using ring forgings assembled by electron beam welding was proposed and investigated by LMES/ER. Although an electrode blank was not obtained, the study indicated that this approach would be successful and cost-effective.

  12. Student Assistance Program Demonstration Project Evaluation. Final Report.

    ERIC Educational Resources Information Center

    Pollard, John A.; Houle, Denise M.

    This document presents the final report on the evaluation of California's model student assistance program (SAP) demonstration projects implemented in five locations across the state from July 1989 through June 1992. The report provides an overall, integrated review of the evaluation of the SAP demonstration projects, summarizes important findings…

  13. Project 2030 Aging Initiative Briefing Book [and] Final Report.

    ERIC Educational Resources Information Center

    Minnesota State Dept. of Human Services, St. Paul.

    This briefing book and final report are products of Project 2030, a two-year Minnesota initiative to identify the impacts of the baby boom generation that begins turning 85 in 2030 and to prepare a state response to the changes that will accompany the aging of Minnesota's population. The briefing book, an introductory publication to Project 2030,…

  14. Assessment and Improvement of Related Services (AIRS) Project. Final Report.

    ERIC Educational Resources Information Center

    McClelland, Robert A.; Hirata, Glenn T.

    The document presents the final report of the Assessment and Improvement of Related Services (AIRS) Project, an effort to assess the impact and effectiveness of special education related services in Hawaii. Each of the four project objectives focused on accomplishment of one of the evaluation types specified in the Context-Input-Process-Product…

  15. Library Literacy Program Project. Final Financial Status and Performance Report.

    ERIC Educational Resources Information Center

    Martin, Anna L.

    The final financial status and performance report for a library literacy program project at the Yuma City-County Library (Arizona) begins with a brief statement of general information about the grant. This is followed by a narrative report that delineates the goal of the project--for the library to take a leadership role in developing,…

  16. The Indiana Deaf-Blind Services Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Goehl, Karen S.

    This final report describes activities and accomplishments of the Indiana Deaf-Blind Services Project, a 3-year federally funded project to enhance and further develop coordinated direct services to children and youth, birth through age 2 and ages 18 through 21. It also was designed to provide technical assistance to public and private agencies…

  17. National Evaluation of the PUSH for Excellence Project. Final Report.

    ERIC Educational Resources Information Center

    Murray, Saundra R.; And Others

    This final report for the PUSH-EXCEL project was designed to provide readers with an idea of the major actors and events that shaped the project's history and implementation, and to describe results of a 3-year evaluation of its impact (Chapter 1). Chapter 2 describes the original impetus for PUSH-EXCEL as arising from the Reverend Jesse Jackson's…

  18. Latin American Literacy Partnership Project. Final Formative Evaluation.

    ERIC Educational Resources Information Center

    Watt, David L. E.

    This final evaluation of the 1991-92 program year of the Latin American literacy Project, designed to foster English language literacy in Spanish-speaking families in Canada, is intended as a formative report, American Literacy Project is intended as a formative report, assessing the changes in the students' language proficiency and the progress…

  19. Science and Engineering Technician Curriculum Development Project. Final Report.

    ERIC Educational Resources Information Center

    Mowery, Donald R.; Wolf, Lawrence J.

    Project SET (Science and Engineering for Technicians) developed a series of study guides designed to teach generic science and engineering skills to students interested in becoming technicians. An entire 2-year curriculum is encompassed by these guides, geared for 2-year college students. Described in this final report are the project's rationale,…

  20. Birth to Three Inservice Outreach Training Project: Final Report.

    ERIC Educational Resources Information Center

    Bruder, Mary Beth; Brand, Marie

    This final report describes objectives, activities, and outcomes of a project to provide training to infant specialists employed within a total of 16 infant intervention programs in New York State. The project focused on the acquisition of skills necessary to provide services under Public Law 99-457. Training content and procedures were derived…

  1. An Evaluation of the Favorable Alternate Sites Project. Final Report.

    ERIC Educational Resources Information Center

    Kogan, Deborah; Vencill, Mary

    This final report describes and evaluates the Favorable Alternate Sites Project (FASP), developed in response to the oversettlement of refugees (particularly Southeast Asian refugees) in particular areas of the country. The project's goals were to reduce welfare dependency, increase the ability of FASP refugees to be self-supporting, and reduce…

  2. Multi-County Assessment of Adult Needs Project: Final Report.

    ERIC Educational Resources Information Center

    McLennan Community Coll., TX.

    The document is a summarized final report of the Multi-County Assessment of Adult Needs Project (MAP) which took place in central Texas (Bosque, Falls, Hill, and McLennan Counties). It summarizes the major activities and accomplishments of the project and contains all materials except Attachments 1 and 2, the reports on Phase I (Survey of Adult…

  3. An Evaluation of the Comp-Lab Project. Final Report.

    ERIC Educational Resources Information Center

    Epes, Mary; And Others

    This final report summarizes an extensive evaluation of the COMP-LAB project, a course which integrates carefully defined classroom instruction with an autotutorial writing laboratory for teaching basic writing and rhetoric, particularly to students impaired by foreign language or nonstandard speech. Information on the project background and the…

  4. Promoting Learning through Active Interaction. Project PLAI. Final Report.

    ERIC Educational Resources Information Center

    Chen, Deborah; Haney, Michele

    This final report describes the activities and outcomes of Promoting Learning through Active Interactions, a research-to-practice 4-year project that developed, implemented, and validated a five-module curriculum with 25 infants (ages 6-30 months) who are deaf-blind, their parents, and early interventionists. The project had the following…

  5. Colorado Better Buildings Project Final Report

    SciTech Connect

    Strife, Susie; Yancey, Lea

    2013-12-30

    The Colorado Better Buildings project intended to bring new and existing energy efficiency model programs to market with regional collaboration and funding partnerships. The goals for Boulder County and its program partners were to advance energy efficiency investments, stimulate economic growth in Colorado and advance the state’s energy independence. Collectively, three counties set out to complete 9,025 energy efficiency upgrades in 2.5 years and they succeeded in doing so. Energy efficiency upgrades have been completed in more than 11,000 homes and businesses in these communities. Boulder County and its partners received a $25 million BetterBuildings grant from the U.S. Department of Energy under the American Recovery and Reinvestment Act in the summer of 2010. This was also known as the Energy Efficiency and Conservation Block Grants program. With this funding, Boulder County, the City and County of Denver, and Garfield County set out to design programs for the residential and commercial sectors to overcome key barriers in the energy upgrade process. Since January 2011, these communities have paired homeowners and business owners with an Energy Advisor – an expert to help move from assessment to upgrade with minimal hassle. Pairing this step-by-step assistance with financing incentives has effectively addressed many key barriers, resulting in energy efficiency improvements and happy customers. An expert energy advisor guides the building owner through every step of the process, coordinating the energy assessment, interpreting results for a customized action plan, providing a list of contractors, and finding and applying for all available rebates and low-interest loans. In addition to the expert advising and financial incentives, the programs also included elements of social marketing, technical assistance, workforce development and contractor trainings, project monitoring and verification, and a cloud-based customer data system to coordinate among field

  6. Meager Creek geothermal project: Final report

    SciTech Connect

    Stauder, J.; Hunt, J. W.

    1987-04-01

    A fracture-dominated geothermal resource with temperatures in excess of 195/sup 0/C (383/sup 0/F) has been identified in the south reservoir area of the Meager Creek Project, 200 km north of Vancouver in British Columbia, Canada Geothermal fluids were intersected in each of three deep exploratory wells drilled in 1981 and 1982. Low flow rates indicated low permeability of the producing zones tested in the wells. A steam generator and a 20-kWe steam turbine-generator module were installed at well MC-1 and were operated during a 6-month period. The liquid flowrate at the wellhead was approximately 57,000 pounds per hour (26 tonnes/hour or 7.2 kg/sec) with a surface temperature of 125/sup 0/C (257/sup 0/F). Turbine performance was measured at 32 to 37 psia (220 to 255 kPa) inlet steam pressure, with exhaust to the atmosphere at 13 psia (90 kPa). B.C. Hydro's downwell temperature measurements and geochemical thermometry analyses are presented, along with results from the turbine testing. Results indicate a production zone at about 1600 m (5300 ft.) with a temperature of 195/sup 0/C (383/sup 0/F), an unproduced zone below 3000 m (10,000 ft.) with temperature approximately 240/sup 0/C (460/sup 0/F), and steam turbine performance measured at 60% of the isentropic efficiency and interpreted to be equivalent to achieving about 75% efficiency with a 20-kWe steam turbine optimized for the service.

  7. Innovative subsurface stabilization project -- Final Report

    SciTech Connect

    Loomis, G.G.; Zdinak, A.P.; Bishop, C.W.

    1996-11-01

    This is a report of results of applying four innovative grouting materials and one commercially available material for creating monoliths out of buried waste sites using jet grouting. The four innovative materials included a proprietary water-based epoxy, an Idaho National Engineering Laboratory-developed two-component grout that resembles hematite when cured with soil, molten low-temperature paraffin, and a proprietary iron oxide cement-based grout called TECT. The commercial grout was Type-H high-sulfate-resistant cement. These materials were tested in specially designed cold test pits that simulate buried transuranic waste at the Idaho National Engineering Laboratory. In addition to the grouting studies, specially designed field-scale permeameters were constructed to perform full-scale controlled mass balance hydraulic conductivity studies. An ungrouted field-scale permeameter contained simulated buried waste and soil and was left ungrouted, and a second identical field-scale permeameter was grouted with commercial-grade Type-H cement. The field demonstrations were performed in an area referred to as the Cold Test Pit at the Idaho National Engineering Laboratory. The Cold Test Pit is adjacent to the laboratory`s Radioactive Waste Management Complex. At the complex, 2 million ft{sup 3} of transuranic waste is commingled with 6--8 million ft{sup 3} of soil in shallow land burial, and improving the confinement of this waste is one of the options for final waste disposition. This report gives results of grouting, coring, hydraulic conductivity, and destructive examination of the grouted buried waste matrix.

  8. Final Technical Report. Project Boeing SGS

    SciTech Connect

    Bell, Thomas E.

    2014-12-31

    Boeing and its partner, PJM Interconnection, teamed to bring advanced “defense-grade” technologies for cyber security to the US regional power grid through demonstration in PJM’s energy management environment. Under this cooperative project with the Department of Energy, Boeing and PJM have developed and demonstrated a host of technologies specifically tailored to the needs of PJM and the electric sector as a whole. The team has demonstrated to the energy industry a combination of processes, techniques and technologies that have been successfully implemented in the commercial, defense, and intelligence communities to identify, mitigate and continuously monitor the cyber security of critical systems. Guided by the results of a Cyber Security Risk-Based Assessment completed in Phase I, the Boeing-PJM team has completed multiple iterations through the Phase II Development and Phase III Deployment phases. Multiple cyber security solutions have been completed across a variety of controls including: Application Security, Enhanced Malware Detection, Security Incident and Event Management (SIEM) Optimization, Continuous Vulnerability Monitoring, SCADA Monitoring/Intrusion Detection, Operational Resiliency, Cyber Range simulations and hands on cyber security personnel training. All of the developed and demonstrated solutions are suitable for replication across the electric sector and/or the energy sector as a whole. Benefits identified include; Improved malware and intrusion detection capability on critical SCADA networks including behavioral-based alerts resulting in improved zero-day threat protection; Improved Security Incident and Event Management system resulting in better threat visibility, thus increasing the likelihood of detecting a serious event; Improved malware detection and zero-day threat response capability; Improved ability to systematically evaluate and secure in house and vendor sourced software applications; Improved ability to continuously monitor

  9. 21 CFR 1240.61 - Mandatory pasteurization for all milk and milk products in final package form intended for direct...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... UNDER CERTAIN OTHER ACTS ADMINISTERED BY THE FOOD AND DRUG ADMINISTRATION CONTROL OF COMMUNICABLE... 21 Food and Drugs 8 2014-04-01 2014-04-01 false Mandatory pasteurization for all milk and milk products in final package form intended for direct human consumption. 1240.61 Section 1240.61 Food...

  10. South Burlington Vermont Career Education Project. Final Financial Status Report and Project Performance Report; Final Evaluation Report, Final Report, January 30, 1979 through June 30, 1979.

    ERIC Educational Resources Information Center

    South Burlington School District, VT.

    This document contains the (1) final status report and project performance report and (2) final evaluation report of a career education project to develop a demonstration model to train school personnel to infuse career education into the curriculum. The first report outlines objectives and major activities involving parents, higher education, and…

  11. Workplan for tributary refinements to Chesapeake Bay eutrophication model package. Final report

    SciTech Connect

    Cerco, C.F.

    1994-05-01

    The Corps of Engineers, in partnership with the U.S. Environmental Protection Agency Chesapeake Bay Program Office, recently completed a three-dimensional model study of eutrophication in Chesapeake Bay and tributaries. The model package applied included an intratidal hydrodynamic model, an intertidal water-quality model, and a benthic sediment diagenesis model. This report comprises a workplan to improve model representation of Chesapeake Bay tributaries and to incorporate living resources directly into the model framework. Four tributaries have been selected for emphasis under this tributary refinements program. They are the James, York, and Rappahannock rivers, and Baltimore Harbor. The James, York, and Rappahannock were specified because tributary-specific models are required to address water-quality and living-resource benefits to be derived from nutrient reductions. Baltimore Harbor was specified because it presents unique management problems, coupled with long-term toxic impacts, which cannot be addressed in the current model framework. The time scale for the project is 4 years from initiation to completion. Anticipated commencement is April 1, 1994.

  12. Petascale Computing Enabling Technologies Project Final Report

    SciTech Connect

    de Supinski, B R

    2010-02-14

    The Petascale Computing Enabling Technologies (PCET) project addressed challenges arising from current trends in computer architecture that will lead to large-scale systems with many more nodes, each of which uses multicore chips. These factors will soon lead to systems that have over one million processors. Also, the use of multicore chips will lead to less memory and less memory bandwidth per core. We need fundamentally new algorithmic approaches to cope with these memory constraints and the huge number of processors. Further, correct, efficient code development is difficult even with the number of processors in current systems; more processors will only make it harder. The goal of PCET was to overcome these challenges by developing the computer science and mathematical underpinnings needed to realize the full potential of our future large-scale systems. Our research results will significantly increase the scientific output obtained from LLNL large-scale computing resources by improving application scientist productivity and system utilization. Our successes include scalable mathematical algorithms that adapt to these emerging architecture trends and through code correctness and performance methodologies that automate critical aspects of application development as well as the foundations for application-level fault tolerance techniques. PCET's scope encompassed several research thrusts in computer science and mathematics: code correctness and performance methodologies, scalable mathematics algorithms appropriate for multicore systems, and application-level fault tolerance techniques. Due to funding limitations, we focused primarily on the first three thrusts although our work also lays the foundation for the needed advances in fault tolerance. In the area of scalable mathematics algorithms, our preliminary work established that OpenMP performance of the AMG linear solver benchmark and important individual kernels on Atlas did not match the predictions of our

  13. Tritium research laboratory cleanup and transition project final report

    SciTech Connect

    Johnson, A.J.

    1997-02-01

    This Tritium Research Laboratory Cleanup and Transition Project Final Report provides a high-level summary of this project`s multidimensional accomplishments. Throughout this report references are provided for in-depth information concerning the various topical areas. Project related records also offer solutions to many of the technical and or administrative challenges that such a cleanup effort requires. These documents and the experience obtained during this effort are valuable resources to the DOE, which has more than 1200 other process contaminated facilities awaiting cleanup and reapplication or demolition.

  14. Self-Correcting HVAC Controls Project Final Report

    SciTech Connect

    Fernandez, Nicholas; Brambley, Michael R.; Katipamula, Srinivas; Cho, Heejin; Goddard, James K.; Dinh, Liem H.

    2010-01-04

    This document represents the final project report for the Self-Correcting Heating, Ventilating and Air-Conditioning (HVAC) Controls Project jointly funded by Bonneville Power Administration (BPA) and the U.S. Department of Energy (DOE) Building Technologies Program (BTP). The project, initiated in October 2008, focused on exploratory initial development of self-correcting controls for selected HVAC components in air handlers. This report, along with the companion report documenting the algorithms developed, Self-Correcting HVAC Controls: Algorithms for Sensors and Dampers in Air-Handling Units (Fernandez et al. 2009), document the work performed and results of this project.

  15. FINAL REPORT FOR THE DIII-D RADIATIVE DIVERTOR PROJECT

    SciTech Connect

    O'NEIL, RC; STAMBAUGH, RD

    2002-06-01

    OAK A271 FINAL REPORT FOR THE DIII-D RADIATIVE DIVERTOR PROJECT. The Radiative Divertor Project originated in 1993 when the DIII-D Five Year Plan for the period 1994--1998 was prepared. The Project Information Sheet described the objective of the project as ''to demonstrate dispersal of divertor power by a factor of then with sufficient diagnostics and modeling to extend the results to ITER and TPX''. Key divertor components identified were: (1) Carbon-carbon and graphite armor tiles; (2) The divertor structure providing a gas baffle and cooling; and (3) The divertor cryopumps to pump fuel and impurities.

  16. Performance oriented packaging report for charge, demolition, shaped, 40 pound, M3A1. Final report

    SciTech Connect

    Sniezek, F.M.

    1992-11-02

    This POP report is for the Charge, Demolition, Shaped, 40 Pound, M3Al which is packaged 1 charge/Mil-B-2427 wood box. This report describes the results of testing conducted.... Performance oriented packaging, POP, Charge, Demolition, Shaped, 40 Pound, M3Al, Mil-B-2427 Wood box.

  17. Performance oriented packaging report for ignitor, time blasting fuse, weatherproof: M60. Final report

    SciTech Connect

    Sniezek, F.

    1992-11-02

    This POP report is for the Time Blasting Fuse, Weatherproof: M60 which is packaged 300/ Mil-B-2427 wood box. This report describes the results of testing conducted.... Performance oriented packaging, POP, Time blasting fuse, Weatherproof: M60 Mil-B-2427 wood box.

  18. Performance oriented packaging report for M7 non-electric blasting cap. Final report

    SciTech Connect

    Sniezek, F.M.

    1992-11-02

    This POP report is for the M7 Non-Electric Blasting Cap which is packaged 480/Mil-B-2427 wood box. This report describes the results of testing conducted. Performance Oriented Packaging, POP, M7 Non-Electric Blasting Cap, Mil-B-2427 Wood box.

  19. Performance oriented packaging report for charge, demolition, shaped, 15 pound, M2A4. Final report

    SciTech Connect

    Sniezek, F.M.

    1992-11-02

    This POP report is for the Charge, Demolition, Shaped, 15 Pound, M2A4 which is packaged 4 charges/Mil-B-2427 wood box. This report describes the results of testing conducted. Performance Oriented Packaging, POP, Charge, Demolition, Shaped, 15 Pound, M2A4, Mil-B-2427 Wood box.

  20. Performance oriented packaging report for cutter, cartridge, actuated, reefing line, M21. Final report

    SciTech Connect

    Sniezek, F.

    1992-11-02

    This POP report is for the Cutter, Cartridge, Actuated, Reefing Line, M21 which is packaged 80 cutters/Mil-B-2427 wood box. This report describes the results of testing conducted.... Performance oriented packaging, POP, Cutter, Cartridge, Actuated, Reefing Line, M21.

  1. Performance oriented packaging report for M6 electric blasting cap. Final report

    SciTech Connect

    Sniezek, F.M.

    1992-11-02

    This POP report is for the M6 Electric Blasting Cap which is packaged 180/ Mil-B-2427 wood box. This report describes the results of testing conducted. Performance Oriented Packaging, POP, M6 Electric Blasting Cap, Mil-B-2427 wood box.

  2. DOE Waste Package Project. Quarterly progress report, April 1, 1993--June 30, 1993 and end of year summary report

    SciTech Connect

    Ladkany, S.G.

    1993-08-01

    Contents of this report are as follows: Overview and progress of waste package project and container design; waste container alternate design considerations; structural analysis and design of nuclear waste package canister; manipulation of the nuclear waste container; design requirements of various rock tunnel shapes for long term storage of high level waste; and transport phenomena in the near field.

  3. ICCS network simulation LDRD project final report summary

    SciTech Connect

    Bryant, B

    1999-01-09

    A critical component of the NIF Integrated Computer Controls System (ICCS) is the local area network (LAN) that enables timely and reliable communication between control applications running on the 600+ computer systems distributed throughout the NIF facility. This project analyzed critical portions of the NIF ICCS network (referred to as "the network" in this report) applying the OPNET Modeler discrete event simulation package to model and simulate network operation and the Network Associates Distributed Sniffer network analyzer to collect actual network performance data in the ICCS Testbed. These tools were selected and procured for use on this project. Simulations and initial network analysis indicate that the network is capable of meeting system requirements. ICCS application software is currently in development, so test software was used to collect performance data. As application software is tested in the Testbed environment, more accurate timing information can be collected which will allow for more accurate large-scale simulations.

  4. The Skills Enhancement Literacy Project of Hawaii. Final Program Model. Final Performance Report. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Hawaii Univ., Manoa. Coll. of Education.

    The Skills Enhancement Literacy Project of Hawaii (SELPH) was a demonstration workplace literacy partnership between the College of Education, University of Hawaii-Manoa and the ITT Sheraton Hotels. Four Sheraton Hotels in Waikiki participated in the project. The program was planned, staff and volunteers were recruited, and marketing strategies…

  5. 76 FR 57729 - Boundary Hydroelectric Project; Sullivan Creek Project; Notice of Availability of the Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... Energy Regulatory Commission Boundary Hydroelectric Project; Sullivan Creek Project; Notice of Availability of the Final Environmental Impact Statement for the Relicensing of the Boundary Hydroelectric... reviewed the applications for license for the Boundary Hydroelectric Project (FERC No. 2144-38), and...

  6. Properties of polystrene bead foam as an encapsulant for electronic packages. Final report

    SciTech Connect

    Fossey, D.J.

    1981-04-01

    Polystyrene bead foam (PSBF) was evaluated as an encapsulant for electronic packages. Various properties of PSBF pertinent to the expected environmental conditioning of a prototype electronic package were determined and evaluated for their effects on individual electronic components, within the package. It was determined that PSBF densities of 0.2 to 0.4 g/cm/sup 3/ provided adequate protection without damaging fragile electronic components. PSBF densities above 0.4 g/cm/sup 3/ provide adequate protection from the shock and vibration spectra evaluated, but could damage fragile electronic components during the encapsulation process and thermal cycling. Buildup of electrostatic voltage during encapsulation can be reduced to safe levels by grounding the case of the electronic package. Only the 0.6 g/cm/sup 3/ PSBF could be made impervious to moisture penetration.

  7. MEMS scanning laser projection based on high-Q vacuum packaged 2D-resonators

    NASA Astrophysics Data System (ADS)

    Hofmann, U.; Eisermann, C.; Quenzer, H.-J.; Janes, J.; Schroeder, C.; Schwarzelbach, O.; Jensen, B.; Ratzmann, L.; Giese, T.; Senger, F.; Hagge, J.; Weiss, M.; Wagner, B.; Benecke, W.

    2011-03-01

    Small size, low power consumption and the capability to produce sharp images without need of an objective make MEMS scanning laser based pico-projectors an attractive solution for embedded cell-phone projection displays. To fulfil the high image resolution demands the MEMS scanning mirror has to show large scan angles, a large mirror aperture size and a high scan frequency. An additional important requirement in pico-projector applications is to minimize power consumption of the MEMS scanner to enable a long video projection time. Typically high losses in power are caused by gas damping. For that reason Fraunhofer ISIT has established a fabrication process for 2D-MEMS mirrors that includes vacuum encapsulation on 8-inch wafers. Quality factors as high as 145,000 require dedicated closed loop phase control electronics to enable stable image projection even at rapidly changing laser intensities. A capacitive feedback signal is the basis for controlling the 2D MEMS oscillation and for synchronising the laser sources. This paper reports on fabrication of two-axis wafer level vacuum packaged scanning micromirrors and its use in a compact laser projection display. The paper presents different approaches of overcoming the well-known reflex problem of packaged MEMS scanning mirrors.

  8. Iowa Hill Pumped Storage Project Investigations - Final Technical Report

    SciTech Connect

    Hanson, David

    2016-07-01

    This Final Technical Report is a summary of the activities and outcome of the Department of Energy (DOE) Assistance Agreement DE-EE0005414 with the Sacramento Municipal Utility District (SMUD). The Assistance Agreement was created in 2012 to support investigations into the Iowa Hill Pumped-storage Project (Project), a new development that would add an additional 400 MW of capacity to SMUD’s existing 688MW Upper American River Hydroelectric Project (UARP) in the Sierra Nevada mountains east of Sacramento, California.

  9. Final year engineering projects in Australia and Europe

    NASA Astrophysics Data System (ADS)

    Ku, H.; Goh, S.

    2010-05-01

    The paper starts by emphasising that final year engineering projects are regarded important in the training and education of professional engineers in Australia and Europe. The sources of projects available to students were also mentioned. Some Australian universities insist on individual projects but some not, each with their own reasons. However, it can be argued that all European universities run individual projects. In most cases, whether it is in Australia or Europe, the total load for final year engineering projects is about 6.25% of the load of engineering programmes. Assessment methods were also described. They were all different whether in Australia or Europe but not very significant. It was discovered that literature reviews, oral presentations and written reports or dissertations were important elements in the assessment schemes. Many university staff, in both continents, encouraged students to publish their work in international conferences and journals if the originality of the projects was high. It can be argued that the individual project is most effective in learning outcome; however, the cost involved is also very high and its sustainability in smaller universities in Australia is in doubt.

  10. The Pittsburgh Science Technology Society Project: A Final Report.

    ERIC Educational Resources Information Center

    O'Brien, George E., Ed.

    This final report on the inservice education of secondary science teachers for the teaching of science via Science Technology Society (STS) materials lists the major objectives of the project as: (1) write four instructional modules with a science, society and technology focus which address special concerns and needs of the underserved and…

  11. The Texas Childhood Hunger Identification Project. Final Report.

    ERIC Educational Resources Information Center

    Center for the Public Policy Priorities, Austin, TX.

    The final report of the Texas Childhood Hunger Identification Project (Texas CHIP), this document describes the most comprehensive study of childhood hunger undertaken in Texas. Through enumeration and interviewing methods, low-income families from 27 counties in Texas were analyzed in the areas of income allocation, food frequency, homelessness,…

  12. Leading Curriculum Innovation in Primary Schools Project: A Final Report

    ERIC Educational Resources Information Center

    Brundrett, Mark; Duncan, Diane

    2015-01-01

    This article provides the final report on a research project that investigated the ways in which curriculum innovation can be led successfully in primary schools. Data gathering included 40 semi-structured interviews in 10 successful primary schools in England of varying sizes and types and in a range of geographical and social locations. Findings…

  13. Learning in Science Project (Form 1-4). Final Report.

    ERIC Educational Resources Information Center

    Waikato Univ., Hamilton (New Zealand).

    The Learning in Science Project investigated teaching and learning in science at the Form 1 to 4 level to identify some of the key difficulties in this subject area and to find ways of overcoming such difficulties. Included in this final report are: (1) brief accounts of the three major phases of the research; (2) a list of papers derived from the…

  14. Using a Multimedia Final Project in an IT Ethics Course

    ERIC Educational Resources Information Center

    Howard, Elizabeth V.; Woods, David M.

    2016-01-01

    In previous semesters of our IT Ethics course, students created traditional final projects where they presented some topic in IT Ethics that we did not cover during the course. Students were free to choose how they would present their information with most groups choosing a traditional presentation where some members of the group were clearly…

  15. Oklahoma Dual Sensory Impairment Technical Assistance Project. Final Report.

    ERIC Educational Resources Information Center

    Lovett, David; Haring, Kathryn

    This final report describes Oklahoma State Department of Education activities designed to improve technical assistance to special education programs and related services for children and youth with deaf-blindness. Specifically, activities of the project included: (1) training professionals, paraprofessionals, and related service providers…

  16. Alabama Deaf-Blind Project, 1995-1999. Final Report.

    ERIC Educational Resources Information Center

    Alabama Inst. for Deaf and Blind, Talladega.

    This final report discusses the activities and outcomes of a 4-year federally funded project designed to meet the critical need in Alabama to provide effective practices in the delivery of educational services to children and youth with deaf-blindness from birth through 21 years of age and to their families and service providers. The project…

  17. El Camino College Basic Skills for Quality Project. Final Report.

    ERIC Educational Resources Information Center

    El Camino Coll., Torrance, CA.

    This is the final report of a cooperative basic skills and literacy project of El Camino College (California) and two companies, BP Chemicals/Hitco Inc. and a division of the Hughes Aircraft Company. An extension of an earlier workplace program with BP chemicals, the program provided basic mathematics, reading, and English-as-a-Second-Language…

  18. Final-Year Education Projects for Undergraduate Chemistry Students

    ERIC Educational Resources Information Center

    Page, Elizabeth

    2011-01-01

    The Undergraduate Ambassadors Scheme provides an opportunity for students in their final year of the chemistry degree course at the University of Reading to choose an educational project as an alternative to practical research. The undergraduates work in schools where they can be regarded as role models and offer one way of inspiring pupils to…

  19. Oklahoma Deaf-Blind Technical Assistance Project. Final Report.

    ERIC Educational Resources Information Center

    Watts, Jan, Comp.

    This final report describes the activities and accomplishments of the Oklahoma Deaf-Blind Technical Assistance Project, an effort to systematically provide training, resource provision and technical assistance (TA) to approximately 120-155 children and youth with deaf-blindness, their families, educators and service providers. The overall impact…

  20. Leading Curriculum Innovation in Primary Schools Project: A Final Report

    ERIC Educational Resources Information Center

    Brundrett, Mark; Duncan, Diane

    2015-01-01

    This article provides the final report on a research project that investigated the ways in which curriculum innovation can be led successfully in primary schools. Data gathering included 40 semi-structured interviews in 10 successful primary schools in England of varying sizes and types and in a range of geographical and social locations. Findings…

  1. Learning in Science Project (Form 1-4). Final Report.

    ERIC Educational Resources Information Center

    Waikato Univ., Hamilton (New Zealand).

    The Learning in Science Project investigated teaching and learning in science at the Form 1 to 4 level to identify some of the key difficulties in this subject area and to find ways of overcoming such difficulties. Included in this final report are: (1) brief accounts of the three major phases of the research; (2) a list of papers derived from the…

  2. Tom Green County Library Literacy Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Vavricka, D. Karen

    The final report of the Tom Green Country Library System (Texas) literacy project details progress toward achievement of 11 objectives. Objectives of the literacy outreach program were to: (1) increase Hispanic enrollment; (2) increase Black enrollment; (3) provide free child care for 4 students to attend 50 tutoring sessions; (4) provide…

  3. Reliability of CGA/LGA/HDI Package Board/Assembly (Final Report)

    NASA Technical Reports Server (NTRS)

    Ghaffaroam. Reza

    2014-01-01

    Package manufacturers are now offering commercial-off-the-shelf column grid array (COTS CGA) packaging technologies in high-reliability versions. Understanding the process and quality assurance (QA) indicators for reliability are important for low-risk insertion of these advanced electronics packages. The previous reports, released in January of 2012 and January of 2013, presented package test data, assembly information, and reliability evaluation by thermal cycling for CGA packages with 1752, 1517, 1509, and 1272 inputs/outputs (I/Os) and 1-mm pitch. It presented the thermal cycling (-55C either 100C or 125C) test results for up to 200 cycles. This report presents up to 500 thermal cycles with quality assurance and failure analysis evaluation represented by optical photomicrographs, 2D real time X-ray images, dye-and-pry photomicrographs, and optical/scanning electron Microscopy (SEM) cross-sectional images. The report also presents assembly challenge using reflowing by either vapor phase or rework station of CGA and land grid array (LGA) versions of three high I/O packages both ceramic and plastic configuration. A new test vehicle was designed having high density interconnect (HDI) printed circuit board (PCB) with microvia-in-pad to accommodate both LGA packages as well as a large number of fine pitch ball grid arrays (BGAs). The LGAs either were assembled onto HDI PCB as an LGA or were solder paste print and reflow first to form solder dome on pads before assembly. Both plastic BGAs with 1156 I/O and ceramic LGAs were assembled. It also presented the X-ray inspection results as well as failures due to 200 thermal cycles. Lessons learned on assembly of ceramic LGAs are also presented.

  4. Admiralty Inlet Pilot Tidal Project Final Technical Report

    SciTech Connect

    Collar, Craig

    2015-09-14

    This document represents the final report for the Admiralty Inlet Pilot Tidal Project, located in Puget Sound, Washington, United States. The Project purpose was to license, permit, and install a grid-connected deep-water tidal turbine array (two turbines) to be used as a platform to gather operational and environmental data on tidal energy generation. The data could then be used to better inform the viability of commercial tidal energy generation from technical, economic, social, and environmental standpoints. This data would serve as a critical step towards the responsible advancement of commercial scale tidal energy in the United States and around the world. In late 2014, Project activities were discontinued due to escalating costs, and the DOE award was terminated in early 2015. Permitting, licensing, and engineering design activities were completed under this award. Final design, deployment, operation, and monitoring were not completed. This report discusses the results and accomplishments achieved under the subject award.

  5. The Midlands Consortium Star Schools Project: Final Report, Final Evaluation Report, Final Evaluation Report Appendices.

    ERIC Educational Resources Information Center

    Midlands Consortium.

    The reports presented in this document describe the results of the first 2 years of the Midlands Consortium Star Schools Project (MCSSP) (October 1, 1988-December 31, 1990). The first report summarizes the major accomplishments of the MCSSP, including: (1) the installation of communications satellites at schools in Alabama, Kansas, Mississippi,…

  6. Polyhydroxyalkanoates (PHA) Bioplastic Packaging Materials

    DTIC Science & Technology

    2010-05-01

    FINAL REPORT Polyhydroxyalkanoates (PHA) Bioplastic Packaging Materials SERDP Project WP-1478 MAY 2010 Dr.Chris Schwier Metabolix... Bioplastic Packaging Materials 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER SI 1478 Dr. Chris Schwier 5e. TASK...polymers were produced using blends of branched, long chain-length PHA polymers with linear PHA polymers.      15. SUBJECT TERMS Bioplastic

  7. SNARK09 - a software package for reconstruction of 2D images from 1D projections.

    PubMed

    Klukowska, Joanna; Davidi, Ran; Herman, Gabor T

    2013-06-01

    The problem of reconstruction of slices and volumes from 1D and 2D projections has arisen in a large number of scientific fields (including computerized tomography, electron microscopy, X-ray microscopy, radiology, radio astronomy and holography). Many different methods (algorithms) have been suggested for its solution. In this paper we present a software package, SNARK09, for reconstruction of 2D images from their 1D projections. In the area of image reconstruction, researchers often desire to compare two or more reconstruction techniques and assess their relative merits. SNARK09 provides a uniform framework to implement algorithms and evaluate their performance. It has been designed to treat both parallel and divergent projection geometries and can either create test data (with or without noise) for use by reconstruction algorithms or use data collected by another software or a physical device. A number of frequently-used classical reconstruction algorithms are incorporated. The package provides a means for easy incorporation of new algorithms for their testing, comparison and evaluation. It comes with tools for statistical analysis of the results and ten worked examples.

  8. DOE Waste Package Project. Quarterly progress report, October 1, 1993--December 31, 1993

    SciTech Connect

    Ladkany, S.G.

    1993-12-31

    The Waste Package Project research activities continued in all research areas. The areas include: Container structural and stress analysis; Nuclear fission criticality studies; Investigation of canister design concepts and corrosion studies; Heat transfer studies; Fluid flow in porous media and radionuclide transport in near field rock; Studies of stresses and stability of the rock formations resulting from the thermal loading of the fuel elements and the multi tunnel concept being analyzed; Characterization of a Faulted Rock Tunnel Model Using Photoelastic and Finite Element Studies; Experiment studies of the dynamic response of a flexible three-link robot using strain gages and Lagrange polynomials; and Robotic manipulation of the nuclear waste container.

  9. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    SciTech Connect

    GREAGER, T.M.

    2000-12-06

    The Quality Assurance Project Plan (QAPjP) has been prepared for waste characterization activities to be conducted by the Transuranic (TRU) Project at the Hanford Site to meet requirements set forth in the Waste Isolation Pilot Plan (WIPP) Hazardous Waste Facility Permit, 4890139088-TSDF, Attachment B, including Attachments B1 through B6 (WAP) (DOE, 1999a). The QAPjP describes the waste characterization requirements and includes test methods, details of planned waste sampling and analysis, and a description of the waste characterization and verification process. In addition, the QAPjP includes a description of the quality assurance/quality control (QA/QC) requirements for the waste characterization program. Before TRU waste is shipped to the WIPP site by the TRU Project, all applicable requirements of the QAPjP shall be implemented. Additional requirements necessary for transportation to waste disposal at WIPP can be found in the ''Quality Assurance Program Document'' (DOE 1999b) and HNF-2600, ''Hanford Site Transuranic Waste Certification Plan.'' TRU mixed waste contains both TRU radioactive and hazardous components, as defined in the WLPP-WAP. The waste is designated and separately packaged as either contact-handled (CH) or remote-handled (RH), based on the radiological dose rate at the surface of the waste container. RH TRU wastes are not currently shipped to the WIPP facility.

  10. Canister Cleaning System Final Design Report Project A-2A

    SciTech Connect

    FARWICK, C.C.

    2000-06-15

    Approximately 2,300 metric tons Spent Nuclear Fuel (SNF) are currently stored within two water filled pools, the 105 K East (KE) fuel storage basin and the 105 K West (KW) fuel storage basin, at the U.S. Department of Energy, Richland Operations Office (RL). The SNF Project is responsible for operation of the K Basins and for the materials within them. A subproject to the SNF Project is the Debris Removal Subproject, which is responsible for removal of empty canisters and lids from the basins. The Canister Cleaning System (CCS) is part of the Debris Removal Project. The CCS will be installed in the KW Basin and operated during the fuel removal activity. The KW Basin has approximately 3600 canisters that require removal from the basin. The CCS is being designed to ''clean'' empty fuel canisters and lids and package them for disposal to the Environmental Restoration Disposal Facility complex. The system will interface with the KW Basin and be located in the Dummy Elevator Pit.

  11. Packaging policies to reform the water sector: The case of the Central Valley Project Improvement Act

    NASA Astrophysics Data System (ADS)

    Fischhendler, Itay; Zilberman, David

    2005-07-01

    Existing water policies often deviate from measures suggested by economic and environmental analysis. This is particularly true in the case of drought response policies, where effective policies are rarely adopted. This study focuses on how to enhance the political feasibility of options rather than identifying the optimal water policies. It argues that a legislative policy package may be a mechanism both to unite divergent interest groups into a coalition with common policy agendas and also to fragment or realign existing and traditional alliances. This majority building approach may have a greater chance of obtaining the required political support to advance water reforms. The negotiation over the Central Valley Project Improvement Act in California is used as an example. The case study illustrates how the policy packaging strategy split the traditional power alliance between the agricultural sector and the urban sector in California and between the agricultural sector in California and their allies in other U.S. western states. At the same time, policy packaging has created new regional and sectoral advocacy coalitions in support of water reform. As a result, the Bureau of Reclamation changed its policies in the Central Valley in California relating to the establishment of water markets, water pricing, and wildlife restoration fund and allocating water for the environment.

  12. Georgia Deaf-Blind Pilot Project: Project EPIC. Final Report. Optional Pilot Projects for Children with Deaf-Blindness.

    ERIC Educational Resources Information Center

    Georgia State Dept. of Education, Atlanta.

    This final report describes activities and accomplishments of Project EPIC (Effective Partner Interaction in the Community), a 3-year federally supported project in Georgia to facilitate the establishment and implementation of effective educational practices with students having deaf-blindness. The project was designed to expand students' present…

  13. Advanced Gas Turbine (AGT) Technology Project: Final report

    SciTech Connect

    Not Available

    1988-08-01

    This final report provides overall summary documentation of the Advanced Gas Turbine Technology Project conducted by the Allison Gas Turbine Division of General Motors Corporation under contract to the NASA-Lewis Research Center (contract DEN3-168). Funding and sponsorship of this project came from the Heat Engine Propulsion Division, Office of Transportation Systems, in the Office of Conservation and Renewable Energy of the Department of Energy (DOE). This program's period of performance (technical) spanned October 1979 through June 1987. This document especially emphasizes program activities during 1986 and 1987; earlier semiannual and annual reports, listed as references, present further details of earlier years. 12 refs., 228 figs., 57 tabs.

  14. Teaming with Technology Research Project, September 30, 2000-June 30, 2001. Final Project Report.

    ERIC Educational Resources Information Center

    Heinlein, Ken B.

    This final report presents findings of a Wyoming research project designed to test the possibility of using interactive technology in the assessment, at a distance, of infants and toddlers in rural or frontier areas. The project compared the quality of reports developed when a transdisciplinary assessment team conducted assessments either in…

  15. MIT LMFBR blanket research project. Final summary report

    SciTech Connect

    Driscoll, M.J.

    1983-08-01

    This is a final summary report on an experimental and analytical program for the investigation of LMFBR blanket characteristics carried out at MIT in the period 1969 to 1983. During this span of time, work was carried out on a wide range of subtasks, ranging from neutronic and photonic measurements in mockups of blankets using the Blanket Test Facility at the MIT Research Reactor, to analytic/numerical investigations of blanket design and economics. The main function of this report is to serve as a resource document which will permit ready reference to the more detailed topical reports and theses issued over the years on the various aspects of project activities. In addition, one aspect of work completed during the final year of the project, on doubly-heterogeneous blanket configurations, is documented for the record.

  16. Fawn Creek Government No. 1. Project Rio Blanco. Final report

    SciTech Connect

    Not Available

    1986-08-01

    Project Rio Blanco was a joint Government-industry experiment using nuclear explosives to stimulate the flow of natural gas from low-permeability formations which could not be economically produced through conventional methods. The project consisted of the simultaneous detonation of three nuclear explosives on May 17, 1973, in a 7000-foot well in northwestern Colorado (Fig. 1). Gas production testing and project evaluation continued through June 1976. The site cleanup and restoration planning phase began in December 1975, and was concluded with the issuance of an operational plan, Project Rio Blanco Site Cleanup and Restoration Plan, NVO-173, in May 1976. Actual site restoration activities were conducted during the period from July to November 1976. Project Rio Blanco Site Restoration Final Report, NVO-183, January 1978, summarizes the activities throughout the restoration period and describes the final site status. The subsurface plugging of Fawn Creek Government No. 1 well commenced on July 16, 1986, and was completed on July 17, 1986. The details of the plugging operation are contained in Appendix B and the final status as plugged and abandoned is shown in Figure 3. The general method was to use the in-place gas production tubing as a working string to set a cast iron bridge plug in the 5 1/2 in. casing at 5030 feet, and to pump an 80-foot cement plug on top of the cast iron bridge plug. The casing was then perforated at selected points to place the required cement plugs. A total of about 266 cubic feet of cement slurry was pumped to place the cement plugs. The 10 3/4 in. surface casing and the 5 1/2 in. casing were cut off below the ground level and a steel plate was welded on the top of the 10 3/4 in. casing. A permanent marker was welded to the steel plate.

  17. Awareness of Standardised Tobacco Packaging among Adults and Young People during the Final Phase of Policy Implementation in Great Britain.

    PubMed

    Bogdanovica, Ilze; Opazo Breton, Magdalena; Langley, Tessa; Britton, John

    2017-07-31

    Background: In May 2016, along with the latest European Tobacco Products Directive (TPD), standardised packaging legislation was implemented in the UK. During the following 12-month transition period, both new and old types of packaging were allowed on the market. This study aimed to assess awareness of standardised packaging and other TPD changes in the UK population in March 2017, when both forms of packaging were in widespread use. Methods: We conducted two surveys-one in adults and one in young people-investigating awareness of plain packaging legislation. In young people, we also measured susceptibility to smoking using previously validated questions. We asked smokers whether they had recently changed the product they used and also whether they used any of the products that are banned by the new legislation. Results: In the adult survey, 73.5% (95% CI: 71.5-75.5%) of the participants were aware of the new legislation and 32.4% (95% CI: 30.3-34.5%) had noticed changes in tobacco packaging, this proportion being considerably higher among smokers (83.7%; 95% CI: 78.9-87.5%) than never smokers (20.7%; 95% CI: 18.2-23.4%). More than half (52.4%; 95% CI: 46.5-58.4%) were using pack sizes or shapes (typically less than 20 cigarettes or 30 g loose tobacco), that would become illegal after full TPD implementation, and 31.4% (95% CI: 26.2-37.1%) reported switching to a different product since October 2016, in most cases to a cheaper brand. Among young people, 20.2% (95% CI: 17.8-22.7%) reported that they had noticed standardised packaging, comprising 16.2% (95% CI: 13.7-19.0%) of non-susceptible never smokers, 25.6% (95% CI: 18.0-35%) of susceptible never smokers, and 49% (95% CI: 37.8-60.2%) of ever smokers. Conclusions: In the final stages of implementation, awareness of the introduction of standardised packs was highest among smokers. The TPD will cause nearly half of adult smokers to purchase larger packs, and may cause many smokers to switch to cheaper brands.

  18. Advanced Air Transportation Technologies Project, Final Document Collection

    NASA Technical Reports Server (NTRS)

    Mogford, Richard H.; Wold, Sheryl (Editor)

    2008-01-01

    This CD ROM contains a compilation of the final documents of the Advanced Air Transportation Technologies (AAIT) project, which was an eight-year (1996 to 2004), $400M project managed by the Airspace Systems Program office, which was part of the Aeronautics Research Mission Directorate at NASA Headquarters. AAIT focused on developing advanced automation tools and air traffic management concepts that would help improve the efficiency of the National Airspace System, while maintaining or enhancing safety. The documents contained in the CD are final reports on AAIT tasks that serve to document the project's accomplishments over its eight-year term. Documents include information on: Advanced Air Transportation Technologies, Autonomous Operations Planner, Collaborative Arrival Planner, Distributed Air/Ground Traffic Management Concept Elements 5, 6, & 11, Direct-To, Direct-To Technology Transfer, Expedite Departure Path, En Route Data Exchange, Final Approach Spacing Tool - (Active and Passive), Multi-Center Traffic Management Advisor, Multi Center Traffic Management Advisor Technology Transfer, Surface Movement Advisor, Surface Management System, Surface Management System Technology Transfer and Traffic Flow Management Research & Development.

  19. Advanced Air Transportation Technologies Project, Final Document Collection

    NASA Technical Reports Server (NTRS)

    Mogford, Richard H.; Wold, Sheryl (Editor)

    2008-01-01

    This CD ROM contains a compilation of the final documents of the Advanced Air Transportation Technologies (AAIT) project, which was an eight-year (1996 to 2004), $400M project managed by the Airspace Systems Program office, which was part of the Aeronautics Research Mission Directorate at NASA Headquarters. AAIT focused on developing advanced automation tools and air traffic management concepts that would help improve the efficiency of the National Airspace System, while maintaining or enhancing safety. The documents contained in the CD are final reports on AAIT tasks that serve to document the project's accomplishments over its eight-year term. Documents include information on: Advanced Air Transportation Technologies, Autonomous Operations Planner, Collaborative Arrival Planner, Distributed Air/Ground Traffic Management Concept Elements 5, 6, & 11, Direct-To, Direct-To Technology Transfer, Expedite Departure Path, En Route Data Exchange, Final Approach Spacing Tool - (Active and Passive), Multi-Center Traffic Management Advisor, Multi Center Traffic Management Advisor Technology Transfer, Surface Movement Advisor, Surface Management System, Surface Management System Technology Transfer and Traffic Flow Management Research & Development.

  20. Final Scientific Report - Wind Powering America State Outreach Project

    SciTech Connect

    Sinclair, Mark; Margolis, Anne

    2012-02-01

    The goal of the Wind Powering America State Outreach Project was to facilitate the adoption of effective state legislation, policy, finance programs, and siting best practices to accelerate public acceptance and development of wind energy. This was accomplished by Clean Energy States Alliance (CESA) through provision of informational tools including reports and webinars as well as the provision of technical assistance to state leaders on wind siting, policy, and finance best practices, identification of strategic federal-state partnership activities for both onshore and offshore wind, and participation in regional wind development collaboratives. The Final Scientific Report - Wind Powering America State Outreach Project provides a summary of the objectives, activities, and outcomes of this project as accomplished by CESA over the period 12/1/2009 - 11/30/2011.

  1. Automated handling of textile yarn packages to enhance radio frequency drying. Final report

    SciTech Connect

    Clapp, T.G.

    1992-11-01

    The benefits of radio frequency (RF) dryers in the textile industry are well documented and include improved product quality, increased drying versatility, uniform drying, and enhanced flexibility for just-in-time (JIT) processing. In spite of these benefits, however, less than 25 of the 400 RF package dryers in use worldwide are located in North America because of the costs associated with additional materials handling operations. This report defines six yarn package handling work functions as candidates for automation, determines the justifiable corporate investment to automate these six functions, and discusses various investment levels and rates of return on such automation. The report also identifies 11 manufacturers that build customized automation equipment and details their systems.

  2. FINAL REPORT FOR MOISTURE EFFECTS ON COMPACTION OF FIBERBOARD IN A 9975 SHIPPING PACKAGE

    SciTech Connect

    Stefek, T.; Daugherty, W.; Estochen, E.

    2013-09-17

    Compaction of lower layers in the fiberboard assembly has been observed in 9975 packages that contain elevated moisture. Lab testing has resulted in a better understanding of the relationship between the fiberboard moisture level and compaction of the lower fiberboard assembly, and the behavior of the fiberboard during transport. In laboratory tests of cane fiberboard, higher moisture content has been shown to correspond to higher total compaction, greater rate of compaction, and continued compaction over a longer period of time. In addition, laboratory tests have shown that the application of a dynamic load results in higher fiberboard compaction compared to a static load. The test conditions and sample geometric/loading configurations were chosen to simulate the regulatory requirements for 9975 package input dynamic loading. Dynamic testing was conducted to acquire immediate and cumulative changes in geometric data for various moisture levels. Two sample sets have undergone a complete dynamic test regimen, one set for 27 weeks, and the second set for 47 weeks. The dynamic input, data acquisition, test effects on sample dynamic parameters, and results from this test program are summarized and compared to regulatory specifications for dynamic loading. Compaction of the bottom fiberboard layers due to the accumulation of moisture is one possible cause of an increase in the axial gap at the top of the package. The net compaction of the bottom layers will directly add to the axial gap. The moisture which caused this compaction migrated from the middle region of the fiberboard assembly (which is typically the hottest). This will cause the middle region to shrink axially, which will also contribute directly to the axial gap. Measurement of the axial gap provides a screening tool for identifying significant change in the fiberboard condition. The data in this report provide a basis to evaluate the impact of moisture and fiberboard compaction on 9975 package performance

  3. Vocational Curriculum Modification. Teaching Technical Language to Learning Handicapped Students. Project HIRE: A Curriculum Management System for Instructing the Handicapped. Final Report, Volume 1.

    ERIC Educational Resources Information Center

    Gardner, David C.; And Others

    Volume 1 of the final report on Project HIRE reports the design, development, field-testing, and refining of self-instructional packages to teach entry level technical vocabulary to learning handicapped students mainstreamed in vocational programs. Volume 2, a management handbook, reports the methods and findings concerning development of…

  4. Utility communications architecture. Volume 6, Final report---Project summary

    SciTech Connect

    Not Available

    1991-12-01

    Integrating communications helps utilities realize the full potential of communications facilities for providing diversified new business opportunities, increasing operational efficiency, improving productivity, and enhance customer service. This volume, the last of six volumes, summarizes results from EPRI`s Utility Communications Architecture (UCA) project, reproducing representative sections of each volume. The UCA Specification Version 1.0 focuses on specific communications requirements of the electric utility industry. The first phase of the project identified information requirements within an electric utility. Two host utilities, Houston Lighting & Power Company and Pacific Gas & Electric Company, participated in the project, providing an industry perspective. Teams of industry experts in each of six defined utility functional areas reviewed host utility communications requirements and broadened these to reflect an industrywide perspective. Subsequent UCA phases assessed communications standards in light utility requirements and selected standards for inclusion in the specification. Many of the deliverables were examined during a UCA workshop in June 1990. Vendors and system integrators then reviewed a draft of the UCA specification. Finally, overall project findings were presented to utilities and vendors. This report is written for the utility executive, telecommunications manager, or functional manager who would like a synopsis of EPRI`s UCA project and is not sure about which volumes would be most helpful. This summary reference enables users to determine which of the detailed UCA reports would be most useful for their particular needs.

  5. A Study of the Norm-Referenced Procedure for Evaluating Project Effectiveness as Applied in the Evaluation of Project Information Packages. Research Memorandum.

    ERIC Educational Resources Information Center

    Kaskowitz, David H.; Norwood, Charles R.

    Project Information Packages (PIPs) are informative kits that describe remedial educational programs and contain instructions for installing the projects in a new site. Six such PIPs were evaluated using a norm-referenced procedure applied to standardized test scores. Pretest scores were compared to posttest scores which were calculated according…

  6. United Nations (UN) performance oriented packaging (POP) testing of DS2 containers. Final report

    SciTech Connect

    Meyer, W.R.

    1992-02-01

    The U.S. Army Defense Ammunition Center and School (USADACS), Validation Engineering Division (SMCAC-DEV), was tasked by U.S. Army Armament Research, Development and Engineering Center (ARDEC), SMCAR-ESK, to perform Performance Oriented Packaging (POP) testing on DS2, level 11, containers to determine their suitability for the transportation and storage of chemical decontaminating agents. At ARDEC, SMCAR-ESK, requested POP testing was conducted at the level I requirements with all containers passing this more severe testing. The following report contains details of the tests conducted.

  7. FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report

    SciTech Connect

    Burger, Chris; Wortman, David; Brown, Chris; Hassan, Syed; Humphreys, Ken; Willford, Mark

    2016-03-31

    The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipeline and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site restoration

  8. Final report for the Advanced Natural Gas Vehicle Project

    SciTech Connect

    John Wozniak

    1999-02-16

    The project objective was to develop the technologies necessary to prototype a dedicated compressed natural gas (CNG) powered, mid-size automobile with operational capabilities comparable to gasoline automobiles. A system approach was used to design and develop the engine, gas storage system and vehicle packaging. The 2.4-liter DOHC engine was optimized for natural gas operation with high-compression pistons, hardened exhaust valves, a methane-specific catalytic converter and multi-point gaseous injection. The chassis was repackaging to increase space for fuel storage with a custom-designed, cast-aluminum, semi-trailing arm rear suspension system, a revised flat trunk sheet-metal floorpan and by equipping the car with run-flat tires. An Integrated Storage system (ISS) was developed using all-composite, small-diameter cylinders encapsulated within a high-strength fiberglass shell with impact-absorbing foam. The prototypes achieved the target goals of a city/highway driving range of 300 miles, ample trunk capacity, gasoline vehicle performance and ultra low exhaust emissions.

  9. Final Report for USGS NEHRP Project 08HQGR0022

    SciTech Connect

    Rodgers, A. J.

    2015-09-29

    This is the final report for United States Geological Survey (USGS) National Earthquake Hazard Reduction Program (NEHRP) Project 08HQGR0022, entitled “Quantifying Uncertainties in Ground Motion Simulations for Scenario Earthquakes on the HaywardRodgers Creek Fault System Using the USGS 3D Seismic Velocity Model and Realistic Pseudodynamics Ruptures”. Work for this project involved three-dimensional (3D) simulations of ground motions for Hayward Fault (HF) earthquakes. We modeled moderate events on the HF and used them to evaluate the USGS 3D model of the San Francisco Bay Area. We also contributed to ground motions modeling effort for a large suite of scenario earthquakes on the HF. Results were presented at conferences (see appendix) and in one peer-reviewed publication (Aagaard et al., 2010).

  10. Standards Improvement Project-Phase II. Final rule.

    PubMed

    2005-01-05

    The Occupational Safety and Health Administration (OSHA) through this final rule is continuing to remove and revise provisions of its standards that are outdated, duplicative, unnecessary, or inconsistent, or can be clarified or simplified by being written in plain language. The Agency completed Phase I of the Standards Improvement Project in June 1998. In this Phase II of the Standards Improvement Project, OSHA is again revising or removing a number of health provisions in its standards for general industry, shipyard employment, and construction. The Agency believes that the changes streamline and make more consistent the regulatory requirements in OSHA health and safety standards. In some cases, OSHA has made substantive revisions to requirements because they are outdated, duplicative, unnecessary, or inconsistent with more recently promulgated health standards. The Agency believes these revisions will reduce regulatory requirements for employers without reducing employee protection.

  11. Tidd PFBC Demonstration Project: Public final design report

    SciTech Connect

    Not Available

    1992-10-01

    This Public Final Design Report describes the 70 MW(e) Tidd PFBC Demonstration Plant under construction in Brilliant, Ohio. This project is receiving cost-sharing from the US Department of Energy (DOE), and is being administered by the Morgantown Energy Technology Center in accordance with DOE Cooperative Agreement No. DE-FC21-87 MC24132.000. The project is also receiving costsharing from the State of Ohio. This award is being administered by the Ohio Coal Development Office. The Tidd PFBC Demonstration Project is the first utility-scale demonstration project in the US. Its objective is to demonstrate that the Pressurized Fluidized Bed Combustion (PFBC) combined-cycle technology is an economic, reliable, and environmentally superior alternative to conventional technology in using high-sulfur coal to generate electricity. Detailed design of the plant began in May 1987, leading to the start of construction in April 1988. First coal fire occurred in November 1990, and the three-year test program began in February 1991.

  12. Tidd PFBC Demonstration Project: Public final design report

    SciTech Connect

    Not Available

    1992-10-01

    This Public Final Design Report describes the 70 MW(e) Tidd PFBC Demonstration Plant under construction in Brilliant, Ohio. This project is receiving cost-sharing from the US Department of Energy (DOE), and is being administered by the Morgantown Energy Technology Center in accordance with DOE Cooperative Agreement No. DE-FC21-87 MC24132.000. The project is also receiving costsharing from the State of Ohio. This award is being administered by the Ohio Coal Development Office. The Tidd PFBC Demonstration Project is the first utility-scale demonstration project in the US. Its objective is to demonstrate that the Pressurized Fluidized Bed Combustion (PFBC) combined-cycle technology is an economic, reliable, and environmentally superior alternative to conventional technology in using high-sulfur coal to generate electricity. Detailed design of the plant began in May 1987, leading to the start of construction in April 1988. First coal fire occurred in November 1990, and the three-year test program began in February 1991.

  13. Final Technical Report - Kotzebue Wind Power Project - Volume II

    SciTech Connect

    Rana Zucchi, Global Energy Concepts, LLC; Brad Reeve, Kotzebue Electric Association; DOE Project Officer - Doug Hooker

    2007-10-31

    The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEA’s wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and community outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.

  14. Hellsgate Winter Range : Wildlife Mitigation Project. Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  15. Plasma diagnostics package. Volume 2: Spacelab 2 section. Part B: Thesis projects

    NASA Technical Reports Server (NTRS)

    Pickett, Jolene S. (Compiler); Frank, L. A. (Compiler); Kurth, W. S. (Compiler)

    1988-01-01

    This volume (2), which consists of two parts (A and B), of the Plasma Diagnostics Package (PDP) Final Science Report contains a summary of all of the data reduction and scientific analyses which were performed using PDP data obtained on STS-51F as a part of the Spacelab 2 (SL-2) payload. This work was performed during the period of launch, July 29, 1985, through June 30, 1988. During this period the primary data reduction effort consisted of processing summary plots of the data received by 12 of the 14 instruments located on the PDP and submitting these data to the National Space Science Data Center (NSSDC). Three Master's and three Ph.D. theses were written using PDP instrumentation data. These theses are listed in Volume 2, Part B.

  16. Programmable SAW development :Sandia/NASA project final report.

    SciTech Connect

    Brocato, Robert Wesley

    2004-10-01

    This report describes a project to develop both fixed and programmable surface acoustic wave (SAW) correlators for use in a low power space communication network. This work was funded by NASA at Sandia National Laboratories for fiscal years 2004, 2003, and the final part of 2002. The role of Sandia was to develop the SAW correlator component, although additional work pertaining to use of the component in a system and system optimization was also done at Sandia. The potential of SAW correlator-based communication systems, the design and fabrication of SAW correlators, and general system utilization of those correlators are discussed here.

  17. Advanced Gas Turbine (AGT) Technology Development Project: Final report

    SciTech Connect

    Not Available

    1988-03-01

    This report is the final in a series of Technical Summary Reports for the Advanced Gas Turbine (AGT) Technology Development Project, authorized under NASA Contract DEN3-167 and sponsored by the DOE. The project was administered by Mr. Thomas N. Strom, Project Manager, NASA-Lewis Research Center, Cleveland, Ohio. This report summarizes plans and progress from October 1979 through June 1987. Project effort conducted under this contract is part of the DOE Gas Turbine Highway Vehicle Systems Program. This program is directed at providing the United States automotive industry the high-risk, long range technology necessary to produce gas turbine engines for automobiles that will have reduced fuel consumption and reduced environmental impact. The intent is that this technology will be capable of reaching the marketplace by the 1990s. The Garrett/Ford automotive Advanced Gas Turbine has been designated the AGT101. The AGT101 nominally is a 74.5 kw (100 shp) engine, capable of speeds to 100,000 rpm and operating at turbine inlet temperatures to 1370C (2500F) with a specific fuel consumption level of 0.18 kg/kw-hr (0.3 lbs/hp-hr) over most of the operating range. This final report summarizes the powertrain design, power section development, and component/ceramic technology development. Appendices include summary reports of progress from Ford Motor Company, AiResearch Casting Company and Pure Carbon, acting as major subcontractors and suppliers of ceramic materials and components. Standard Oil Company's Unique and Common work accomplished under this program is published in topical report (TBD).

  18. Competency-Based Transfer Pilot Project--Final Report. Executive Summary [and] Competency-Based Transfer Pilot Project: Final Report on House Bill 1909

    ERIC Educational Resources Information Center

    Washington Higher Education Coordinating Board, 2006

    2006-01-01

    This publication contains the following: (1) Competency-Based Transfer Pilot Project--Final Report. Executive Summary (January 2006); and (2) Competency-Based Transfer Pilot Project: Final Report on House Bill 1909 (January 2005). In 2003, the legislature and governor enacted House Bill 1909 to create a pilot project on competency-based transfer…

  19. Ferrocyanide safety project ferrocyanide aging studies. Final report

    SciTech Connect

    Lilga, M.A.; Hallen, R.T.; Alderson, E.V.

    1996-06-01

    This final report gives the results of the work conducted by Pacific Northwest National Laboratory (PNNL) from FY 1992 to FY 1996 on the Ferrocyanide Aging Studies, part of the Ferrocyanide Safety Project. The Ferrocyanide Safety Project was initiated as a result of concern raised about the safe storage of ferrocyanide waste intermixed with oxidants, such as nitrate and nitrite salts, in Hanford Site single-shell tanks (SSTs). In the laboratory, such mixtures can be made to undergo uncontrolled or explosive reactions by heating dry reagents to over 200{degrees}C. In 1987, an Environmental Impact Statement (EIS), published by the U.S. Department of Energy (DOE), Final Environmental Impact Statement, Disposal of Hanford Defense High-Level Transuranic and Tank Waste, Hanford Site, Richland, Washington, included an environmental impact analysis of potential explosions involving ferrocyanide-nitrate mixtures. The EIS postulated that an explosion could occur during mechanical retrieval of saltcake or sludge from a ferrocyanide waste tank, and concluded that this worst-case accident could create enough energy to release radioactive material to the atmosphere through ventilation openings, exposing persons offsite to a short-term radiation dose of approximately 200 mrem. Later, in a separate study (1990), the General Accounting Office postulated a worst-case accident of one to two orders of magnitude greater than that postulated in the DOE EIS. The uncertainties regarding the safety envelope of the Hanford Site ferrocyanide waste tanks led to the declaration of the Ferrocyanide Unreviewed Safety Question (USQ) in October 1990.

  20. Blue Creek Winter Range : Wildlife Mitigation Project : Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration; United States. Bureau of Indian Affairs; Spokane Tribe of the Spokane Reservation, Washington

    1994-11-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Agreement pertaining to the Blue Creek Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Spokane Tribe, Upper Columbia United Tribes, and the Bureau of Indian Affairs (BIA). If fully implemented, the proposed action would allow the sponsors to protect and enhance 2,631 habitat units of big game winter range and riparian shrub habitat on 2,185 hectares (5,400 acres) of Spokane Tribal trust lands, and to conduct long term wildlife management activities within the Spokane Indian Reservation project area. This Final Environmental Assessment (EA) examines the potential environmental effects of securing land and conducting wildlife habitat enhancement and long term management activities within the boundaries of the Spokane Indian Reservation. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat adversely affected by the construction of Grand Coulee Dam and its reservoir.

  1. Geothermal heating demonstration project at Mammoth Lakes Village. Final report

    SciTech Connect

    Sims, A.V.; Campbell, R.G.

    1980-03-01

    A pilot project is described which demonstrated the feasibility of using geothermal energy for space heating and snow-melting at the Casa Diablo geothermal reservoir near Mammoth Lakes Village, California. The geothermal heating system employed was modeled after the geothermal district heating system used extensively in Iceland. The geothermal heating system incorporated a closed secondary heating loop (Iceland's system uses the geothermal fluids directly) to provide heat to a lumber store, warehouse and display area, and to melt snow on a connecting walkway between the buildings. The secondary loop, containing a mixture of fresh water and ethylene glycol, was heated by geothermal fluids produced from a nearby well. After passing through a heat exchanger, the cooled geothermal fluids were reinjected down another well. The heating system operated for three different periods, and the project concluded after a successful, long-term demonstration of well pump and heating system operation. Pump problems encountered early in the project were solved, and information gained in the final operation period indicated that reliable, extended periods of well pump operation can be achieved. The hydronic heaters effectively heated buildings, and the snow-melting walkway performed very well during winter operation.

  2. Final Report Sustained Spheromak Physics Project FY 1997 - FY 1999

    SciTech Connect

    Hooper, E.B.; Hill, D.N.

    2000-02-29

    This is the final report on the LDRD SI-funded Sustained Spheromak Physics Project for the years FY1997-FY1999, during which the SSPX spheromak was designed, built, and commissioned for operation at LLNL. The specific LDRD project covered in this report concerns the development, installation, and operation of specialized hardware and diagnostics for use on the SSPX facility in order to study energy confinement in a sustained spheromak plasma configuration. The USDOE Office of Fusion Energy Science funded the construction and routine operation of the SSPX facility. The main distinctive feature of the spheromak is that currents in the plasma itself produce the confining toroidal magnetic field, rather than external coils, which necessarily thread the vacuum vessel. There main objective of the Sustained Spheromak Physics Project was to test whether sufficient energy confinement could be maintained in a spheromak plasma sustained by DC helicity injection. Achieving central electron temperatures of several hundred eV would indicate this. In addition, we set out to determine how the energy confinement scales with T{sub c} and to relate the confinement time to the level of internal magnetic turbulence. Energy confinement and its scaling are the central technical issues for the spheromak as a fusion reactor concept. Pending the outcome of energy confinement studies now under way, the spheromak could be the basis for an attractive fusion reactor because of its compact size, simply-connected magnetic geometry, and potential for steady-state current drive.

  3. Northeast Oregon Hatchery Project, Conceptual Design Report, Final Report.

    SciTech Connect

    Watson, Montgomery

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  4. The Spectrum projection package: improvements in estimating mortality, ART needs, PMTCT impact and uncertainty bounds.

    PubMed

    Stover, J; Johnson, P; Zaba, B; Zwahlen, M; Dabis, F; Ekpini, R E

    2008-08-01

    The approach to national and global estimates of HIV/AIDS used by UNAIDS starts with estimates of adult HIV prevalence prepared from surveillance data using either the Estimation and Projection Package (EPP) or the Workbook. Time trends of prevalence are transferred to Spectrum to estimate the consequences of the HIV/AIDS epidemic, including the number of people living with HIV, new infections, AIDS deaths, AIDS orphans, treatment needs and the impact of treatment on survival. The UNAIDS Reference Group on Estimates, Modelling and Projections regularly reviews new data and information needs and recommends updates to the methodology and assumptions used in Spectrum. The latest update to Spectrum was used in the 2007 round of global estimates. Several new features have been added to Spectrum in the past two years. The structure of the population was reorganised to track populations by HIV status and treatment status. Mortality estimates were improved by the adoption of new approaches to estimating non-AIDS mortality by single age, and the use of new information on survival with HIV in non-treated cohorts and on the survival of patients on antiretroviral treatment (ART). A more detailed treatment of mother-to-child transmission of HIV now provides more prophylaxis and infant feeding options. New procedures were implemented to estimate the uncertainty around each of the key outputs. The latest update to the Spectrum program is intended to incorporate the latest research findings and provide new outputs needed by national and international planners.

  5. Tractor Mechanics. Maintaining and Servicing the Power Train, Learning Activity Packages 49-53; Maintaining and Servicing the Clutch, Learning Activity Packages 54-59; Maintaining and Servicing the Transmission and Differential, Learning Activity Packages 60-68; Maintaining and Servicing the Final Drive, Learning Activity Packages 69-77.

    ERIC Educational Resources Information Center

    Clemson Univ., SC. Vocational Education Media Center.

    This series of learning activity packages focuses on four areas of tractor mechanics: (1) maintaining and servicing the power train, (2) maintaining and servicing the clutch, (3) maintaining and servicing the transmission and differential, and (4) maintaining and servicing the final drive. Each of the twenty-nine illustrated learning activity…

  6. 77 FR 40601 - Final Priority: Disability and Rehabilitation Research Projects and Centers Program; Disability...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ... Final Priority: Disability and Rehabilitation Research Projects and Centers Program; Disability Rehabilitation Research Project; Employment of Individuals With Disabilities AGENCY: Office of Special Education...: 84.133A-1. Final Priority; National Institute on Disability and Rehabilitation Research (NIDRR...

  7. NASA Ames Hosts Viewing Party for Final Shuttle Launch (Reporter Package)

    NASA Image and Video Library

    2011-07-12

    The public was invited to NASA's Ames Research Center to observe a live televised broadcast of the final space shuttle launch on July 8, 2011. The STS-135 mission is the final flight of NASA's Space Shuttle Program. The orbiter Atlantis is carrying a system to investigate the potential for robotically refueling existing spacecraft and bring back a failed ammonia pump to help NASA better understand and improve pump designs for future systems. It also will deliver spare parts to sustain space station operations after the shuttles retire from service.

  8. The Effective Implementation of Word-of-Mouth Recruitment: A Staff Development Package. Final Report.

    ERIC Educational Resources Information Center

    Mid-State Literacy Council, State College, PA.

    Literacy councils in central Pennsylvania recruited more potential students within their communities and increased the number of students enrolling in their programs through a staff development project. Direct-service personnel from local human service agencies that constituted important referral sources for literacy councils were targeted for…

  9. Self-Paced Instructional Packages on Utilizing Library Resources. Final Report.

    ERIC Educational Resources Information Center

    Howison, Beulah; And Others

    A project was undertaken by the University of Wisconsin library staff to educate freshmen and transfer students in the resources of the library and resource use. Visually appealing library instructional packets were produced in several media formats to achieve this aim. They were in two forms: a minipacket for quick help in finding library…

  10. In-Service Development through the Use of Video-Tapes and Learning Packages. Final Report.

    ERIC Educational Resources Information Center

    Shaw, Alvie L.

    The first section of this final report is an introduction that is on video tape and available only through the author. The second section, which is written, concerns large group instruction. It contains infcrmation on the lecture and on an instructional management strategy for individualized learning. Small group instruction is explored in section…

  11. Construction Package No. 2. Final Earthwork and Roadwork (RADL Item 7-28)

    SciTech Connect

    Not Available

    1980-07-01

    The final earthwork, aggregate surfacing, roadwork and paving for the Barstow Solar Pilot Plant are presented. The work consisted of applying weed killer to surfaces to be paved, constructing bituminous pavements, restoring existing compacted aggregate base roadways, and stripping and removing existing grade from the core area for compacted aggregate surfacing.

  12. 76 FR 21403 - Notice of Availability of the Final Environmental Impact Statement for the Genesis Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-15

    ... Final Environmental Impact Statement (EIS) for the Newmont Mining Corporation's proposed Genesis Project...] Notice of Availability of the Final Environmental Impact Statement for the Genesis Project, Eureka County... its notice in the Federal Register. ADDRESSES: Printed copies of the Genesis Project Final EIS are...

  13. Final Report for the Center for Advanced Processing and Packaging Studies (CAPPS)

    DTIC Science & Technology

    2010-11-30

    were almost completely inactivated (less than 1 log survivor) at pH 7.0 and 4 oC. 2. Inactivation of norovirus in strawberry puree. We have...determined the effectiveness of norovirus inactivation in strawberry puree. Viruses were inoculated into strawberry puree at final concentration of 107...higher pressure (450MPa) and lower temperature (4oC). 3. The effect of pH on the inactivation of norovirus in strawberry puree. The natural pH of

  14. Umatilla Satellite and Release Sites Project : Final Conceptual Design Report.

    SciTech Connect

    Montgomery, James M.

    1992-03-01

    This report presents the results of site analysis for the Umatilla Satellite and Release Sites Project. The purpose of this project is to provide engineering services for the siting and conceptual design of satellite and release facilities for the Umatilla Basin hatchery program. The Umatilla Basin hatchery program consists of artificial production facilities for salmon and steelhead to enhance production in the Umatilla River as defined in the Umatilla master plan approved in 1989 by the Northwest Power Planning Council. Facilities identified in the master plan include adult salmon broodstock holding and spawning facilities, facilities for recovery, acclimation, and/or extended rearing of salmon juveniles, and development of river sites for release of hatchery salmon and steelhead. The historic and current distribution of fall chinook, summer chinook, and coho salmon and steelhead trout was summarized for the Umatilla River basin. Current and future production and release objectives were reviewed. Twenty seven sites were evaluated for the potential development of facilities. Engineering and environmental attributes of the sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  15. Umatilla Satellite and Release Sites Project : Final Siting Report.

    SciTech Connect

    Montgomery, James M.

    1992-04-01

    This report presents the results of site analysis for the Umatilla Satellite and Release Sites Project. The purpose of this project is to provide engineering services for the siting and conceptual design of satellite and release facilities for the Umatilla Basin hatchery program. The Umatilla Basin hatchery program consists of artificial production facilities for salmon and steelhead to enhance production in the Umatilla River as defined in the Umatilla master plan approved in 1989 by the Northwest Power Planning Council. Facilities identified in the master plan include adult salmon broodstock holding and spawning facilities, facilities for recovery, acclimation, and/or extended rearing of salmon juveniles, and development of river sites for release of hatchery salmon and steelhead. The historic and current distribution of fall chinook, summer chinook, and coho salmon and steelhead trout was summarized for the Umatilla River basin. Current and future production and release objectives were reviewed. Twenty seven sites were evaluated for the potential and development of facilities. Engineering and environmental attributes of the sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  16. NEET Micro-Pocket Fission Detector. Final Project report

    SciTech Connect

    Unruh, T.; Rempe, Joy; McGregor, Douglas; Ugorowski, Philip; Reichenberger, Michael; Ito, Takashi; Villard, J. -F.

    2014-09-01

    A collaboration between the Idaho National Laboratory (INL), the Kansas State University (KSU), and the French Alternative Energies and Atomic Energy Commission, Commissariat à l'Énergie Atomique et aux Energies Alternatives, (CEA), is funded by the Nuclear Energy Enabling Technologies (NEET) program to develop and test Micro-Pocket Fission Detectors (MPFDs), which are compact fission chambers capable of simultaneously measuring thermal neutron flux, fast neutron flux and temperature within a single package. When deployed, these sensors will significantly advance flux detection capabilities for irradiation tests in US Material Test Reactors (MTRs). Ultimately, evaluations may lead to a more compact, more accurate, and longer lifetime flux sensor for critical mock-ups, and high performance reactors, allowing several Department of Energy Office of Nuclear Energy (DOE-NE) programs to obtain higher accuracy/higher resolution data from irradiation tests of candidate new fuels and materials. Specifically, deployment of MPFDs will address several challenges faced in irradiations performed at MTRs: Current fission chamber technologies do not offer the ability to measure fast flux, thermal flux and temperature within a single compact probe; MPFDs offer this option. MPFD construction is very different than current fission chamber construction; the use of high temperature materials allow MPFDs to be specifically tailored to survive harsh conditions encountered in-core of high performance MTRs. The higher accuracy, high fidelity data available from the compact MPFD will significantly enhance efforts to validate new high-fidelity reactor physics codes and new multi-scale, multi-physics codes. MPFDs can be built with variable sensitivities to survive the lifetime of an experiment or fuel assembly in some MTRs, allowing for more efficient and cost effective power monitoring. The small size of the MPFDs allows multiple sensors to be deployed, offering the potential to accurately

  17. High Performance Building Facade Solutions - PIER Final Project Report

    SciTech Connect

    Lee, Eleanor; Selkowitz, Stephen

    2009-12-31

    Building facades directly influence heating and cooling loads and indirectly influence lighting loads when daylighting is considered, and are therefore a major determinant of annual energy use and peak electric demand. Facades also significantly influence occupant comfort and satisfaction, making the design optimization challenge more complex than many other building systems.This work focused on addressing significant near-term opportunities to reduce energy use in California commercial building stock by a) targeting voluntary, design-based opportunities derived from the use of better design guidelines and tools, and b) developing and deploying more efficient glazings, shading systems, daylighting systems, facade systems and integrated controls. This two-year project, supported by the California Energy Commission PIER program and the US Department of Energy, initiated a collaborative effort between The Lawrence Berkeley National Laboratory (LBNL) and major stakeholders in the facades industry to develop, evaluate, and accelerate market deployment of emerging, high-performance, integrated facade solutions. The LBNL Windows Testbed Facility acted as the primary catalyst and mediator on both sides of the building industry supply-user business transaction by a) aiding component suppliers to create and optimize cost effective, integrated systems that work, and b) demonstrating and verifying to the owner, designer, and specifier community that these integrated systems reliably deliver required energy performance. An industry consortium was initiated amongst approximately seventy disparate stakeholders, who unlike the HVAC or lighting industry, has no single representative, multi-disciplinary body or organized means of communicating and collaborating. The consortium provided guidance on the project and more importantly, began to mutually work out and agree on the goals, criteria, and pathways needed to attain the ambitious net zero energy goals defined by California and

  18. Agricultural Energy Curriculum Development Project. Research and Development Project in Career Education, Vocational. Final Project.

    ERIC Educational Resources Information Center

    Wacholz, Marlin

    A project was conducted to develop energy instructional units which would fit into each year of a three-year farm business management curriculum. Four curriculum units which focus on fertilizer management in crop production were developed. The first unit was designed to develop farmers' awareness of energy as a vital resource to their businesses…

  19. Agricultural Energy Curriculum Development Project. Research and Development Project in Career Education, Vocational. Final Project.

    ERIC Educational Resources Information Center

    Wacholz, Marlin

    A project was conducted to develop energy instructional units which would fit into each year of a three-year farm business management curriculum. Four curriculum units which focus on fertilizer management in crop production were developed. The first unit was designed to develop farmers' awareness of energy as a vital resource to their businesses…

  20. rAvis: An R-Package for Downloading Information Stored in Proyecto AVIS, a Citizen Science Bird Project

    PubMed Central

    Varela, Sara; González-Hernández, Javier; Casabella, Eduardo; Barrientos, Rafael

    2014-01-01

    Citizen science projects store an enormous amount of information about species distribution, diversity and characteristics. Researchers are now beginning to make use of this rich collection of data. However, access to these databases is not always straightforward. Apart from the largest and international projects, citizen science repositories often lack specific Application Programming Interfaces (APIs) to connect them to the scientific environments. Thus, it is necessary to develop simple routines to allow researchers to take advantage of the information collected by smaller citizen science projects, for instance, programming specific packages to connect them to popular scientific environments (like R). Here, we present rAvis, an R-package to connect R-users with Proyecto AVIS (http://proyectoavis.com), a Spanish citizen science project with more than 82,000 bird observation records. We develop several functions to explore the database, to plot the geographic distribution of the species occurrences, and to generate personal queries to the database about species occurrences (number of individuals, distribution, etc.) and birdwatcher observations (number of species recorded by each collaborator, UTMs visited, etc.). This new R-package will allow scientists to access this database and to exploit the information generated by Spanish birdwatchers over the last 40 years. PMID:24626233

  1. rAvis: an R-package for downloading information stored in Proyecto AVIS, a citizen science bird project.

    PubMed

    Varela, Sara; González-Hernández, Javier; Casabella, Eduardo; Barrientos, Rafael

    2014-01-01

    Citizen science projects store an enormous amount of information about species distribution, diversity and characteristics. Researchers are now beginning to make use of this rich collection of data. However, access to these databases is not always straightforward. Apart from the largest and international projects, citizen science repositories often lack specific Application Programming Interfaces (APIs) to connect them to the scientific environments. Thus, it is necessary to develop simple routines to allow researchers to take advantage of the information collected by smaller citizen science projects, for instance, programming specific packages to connect them to popular scientific environments (like R). Here, we present rAvis, an R-package to connect R-users with Proyecto AVIS (http://proyectoavis.com), a Spanish citizen science project with more than 82,000 bird observation records. We develop several functions to explore the database, to plot the geographic distribution of the species occurrences, and to generate personal queries to the database about species occurrences (number of individuals, distribution, etc.) and birdwatcher observations (number of species recorded by each collaborator, UTMs visited, etc.). This new R-package will allow scientists to access this database and to exploit the information generated by Spanish birdwatchers over the last 40 years.

  2. CERTS Microgrid Laboratory Test Bed - PIER Final Project Report

    SciTech Connect

    Eto, Joseph H.; Eto, Joseph H.; Lasseter, Robert; Schenkman, Ben; Klapp, Dave; Linton, Ed; Hurtado, Hector; Roy, Jean; Lewis, Nancy Jo; Stevens, John; Volkommer, Harry

    2008-07-25

    The objective of the CERTS Microgrid Laboratory Test Bed project was to enhance the ease of integrating small energy sources into a microgrid. The project accomplished this objective by developing and demonstrating three advanced techniques, collectively referred to as the CERTS Microgrid concept, that significantly reduce the level of custom field engineering needed to operate microgrids consisting of small generating sources. The techniques comprising the CERTS Microgrid concept are: 1) a method for effecting automatic and seamless transitions between grid-connected and islanded modes of operation; 2) an approach to electrical protection within the microgrid that does not depend on high fault currents; and 3) a method for microgrid control that achieves voltage and frequency stability under islanded conditions without requiring high-speed communications. The techniques were demonstrated at a full-scale test bed built near Columbus, Ohio and operated by American Electric Power. The testing fully confirmed earlier research that had been conducted initially through analytical simulations, then through laboratory emulations, and finally through factory acceptance testing of individual microgrid components. The islanding and resychronization method met all Institute of Electrical and Electronics Engineers 1547 and power quality requirements. The electrical protections system was able to distinguish between normal and faulted operation. The controls were found to be robust and under all conditions, including difficult motor starts. The results from these test are expected to lead to additional testing of enhancements to the basic techniques at the test bed to improve the business case for microgrid technologies, as well to field demonstrations involving microgrids that involve one or mroe of the CERTS Microgrid concepts.

  3. NTRCI Legacy Engine Research and Development Project Final Technical Report

    SciTech Connect

    Smith-Holbert, Connie; Petrolino, Joseph; Watkins, Bart; Irick, David

    2011-12-31

    The Legacy engine is a completely new design, transitional diesel engine, replacing the reciprocating engine with a rotary engine. The Legacy engine offers significant advances over conventional internal combustion engines in 1) power to weight ratio; 2) multiple fuel acceptance; 3) fuel economy; and 4) environmental compliance. These advances are achieved through a combination of innovative design geometry, rotary motion, aspiration simplicity, and manufacturing/part simplicity. The key technical challenge to the Legacy engine's commercialization, and the focus of this project, was the development of a viable roton tip seal. The PST concept for the roton tip seal was developed into a manufacturable design. The design was evaluated using a custom designed and fabricated seal test fixture and further refined. This design was incorporated into the GEN2.5A prototype and tested for achievable compression pressure. The Decision Point at the end of Phase 1 of the project (described below) was to further optimize the existing tip seal design. Enhancements to the tip seal design were incorporated into the GEN2.5B prototype and tested and evaluated using the iterative research strategy described below. Compression pressures adequate for compression ignition of diesel fuel were achieved, although not consistently in all combustion volumes. The variation in compression pressures was characterized versus design features. As the roton tip seal performance was improved, results pointed toward inadequate performance of the housing side seals. Enhancement of the housing side seal system was accomplished using a custom designed side seal test fixture. The design enhancements developed with the test fixture were also incorporated into the GEN2.5B prototype and tested and evaluated using the iterative research strategy described below. Finally, to simplify the requirements for the roton tip seals and to enhance the introduction and combustion of fuel, a flush-mount fuel injector was

  4. Neutral Site Planning Project, Final Report. Volume III: Curriculum Development.

    ERIC Educational Resources Information Center

    Providence School Dept., RI.

    A curriculum package designed for Providence, Rhode Island's proposed magnet school program is presented in this report. Included are the curricula for Health Careers, Creative, Performing and Communications Arts, Business and Management, and Government and Law Magnet Programs. General information about each curriculum covers overall goals,…

  5. Project Familia. Final Evaluation Report, 1993-94. OER Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Educational Research.

    Project Familia was an Elementary and Secondary Education Act Title VII project in its second year in 1993-94 in New York City. Project Familia served 77 children at 3 schools who were identified as limited English proficient, special education students in prekindergarten through fifth grade and their parents. The project provided after-school…

  6. Macroencapsulation of mixed waste debris at the Hanford Nuclear Reservation -- Final project report by AST Environmental Services, LLC

    SciTech Connect

    Baker, T.L.

    1998-02-25

    This report summarizes the results of a full-scale demonstration of a high density polyethylene (HDPE) package, manufactured by Arrow Construction, Inc. of Montgomery, Alabama. The HDPE package, called ARROW-PAK, was designed and patented by Arrow as both a method to macroencapsulation of radioactively contaminated lead and as an improved form of waste package for treatment and interim and final storage and/or disposal of drums of mixed waste. Mixed waste is waste that is radioactive, and meets the criteria established by the United States Environmental Protection Agency (US EPA) for a hazardous material. Results from previous testing conducted for the Department of Energy (DOE) at the Idaho National Engineering Laboratory in 1994 found that the ARROW-PAK fabrication process produces an HDPE package that passes all helium leak tests and drop tests, and is fabricated with materials impervious to the types of environmental factors encountered during the lifetime of the ARROW-PAK, estimated to be from 100 to 300 years. Arrow Construction, Inc. has successfully completed full-scale demonstration of its ARROW-PAK mixed waste macroencapsulation treatment unit at the DOE Hanford Site. This testing was conducted in accordance with Radiological Work Permit No. T-860, applicable project plans and procedures, and in close consultation with Waste Management Federal Services of Hanford, Inc.`s project management, health and safety, and quality assurance representatives. The ARROW-PAK field demonstration successfully treated 880 drums of mixed waste debris feedstock which were compacted and placed in 149 70-gallon overpack drums prior to macroencapsulation in accordance with the US EPA Alternate Debris Treatment Standards, 40 CFR 268.45. Based on all of the results, the ARROW-PAK process provides an effective treatment, storage and/or disposal option that compares favorably with current mixed waste management practices.

  7. Final-Year Projects as a Major Element in the IE Curriculum

    ERIC Educational Resources Information Center

    Vitner, G.; Rozenes, S.

    2009-01-01

    This paper presents a multi-perspective view of the final-year project of an industrial engineering and management (IEM) department. The final year project is a major element of a 4-year curriculum within any engineering discipline. Such a project gives the student an opportunity to use and implement methods, techniques and tools that he or she…

  8. Final-Year Projects as a Major Element in the IE Curriculum

    ERIC Educational Resources Information Center

    Vitner, G.; Rozenes, S.

    2009-01-01

    This paper presents a multi-perspective view of the final-year project of an industrial engineering and management (IEM) department. The final year project is a major element of a 4-year curriculum within any engineering discipline. Such a project gives the student an opportunity to use and implement methods, techniques and tools that he or she…

  9. Using estimation and projection package and Spectrum for Jamaica's national HIV estimates and targets.

    PubMed

    Duncan, Jacqueline; Beckford Jarrett, Sharlene; Harvey, Kevin

    2010-12-01

    Adequate coverage of target populations ensures that desired outcomes, such as increased survival of people living with HIV, are achieved. However, estimates of coverage and impact of HIV programmes using available data are limited by the complex natural history of HIV, underreporting of cases and inadequate information systems. Jamaica's national HIV estimates were generated using the 2009 version of the UNAIDS estimation and projection package (EPP) and Spectrum. National data used included sentinel surveillance data on antenatal clinic attendees (1986-2005 and 2007), distribution of antiretroviral regimes for prevention of mother-to-child transmission, distribution of antiretroviral therapy (ART) among adults and ART distribution in subpopulations (e.g., men who have sex with men (MSM) and sex workers). Surveys of MSM (2007), sex worker (2001, 2005, 2008), STI clinic attendees (1990-2002) and inmates (2006) also provided inputs. In 2009, Jamaica's HIV prevalence was estimated at 1.7% (range 1.1-2.5) and 31 000 (range 20 000-43 000) adults (>15 years) were living with HIV. The number of adults in need of treatment was 15 000 (range 11 000-19 000) and approximately 2100 new infections occurred in 2009. The EPP/Spectrum estimates were generally consistent with locally available data. However, the number of persons with advanced HIV targeted by the national treatment programme was significantly lower than Spectrum's estimated target population. EPP/Spectrum can provide important data for national HIV programme planning. Improved monitoring and evaluation systems will provide quality data and result in more robust estimates.

  10. Final report Hanford environmental compliance project 89-D-172

    SciTech Connect

    Kelly, J.R.

    1996-02-08

    The Hanford Environmental Compliance (HEC) Project is unique in that it consisted of 14 subprojects which varied in project scope and were funded from more that one program. This report describes the HEC Project from inception to completion and the scope, schedule, and cost of the individual subprojects. Also provided are the individual subproject Cost closing statements and Project completion reports accompanied by construction photographs and illustrations.

  11. Project Aprendizaje. 1990-91 Final Evaluation Profile. OREA Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Research, Evaluation, and Assessment.

    An evaluation was done of New York City Public Schools' Project Aprendizaje, which served disadvantaged, immigrant, Spanish-speaking high school students at Seward Park High School in Manhattan. The Project enrolled 290 students in grades 9 through 12, 93.1 percent of whom were eligible for the Free Lunch Program. The Project provided students of…

  12. The Workplace Literacy System Project (WLS). Final Performance Report.

    ERIC Educational Resources Information Center

    Poulton, Bruce R.

    The Workplace Literacy System Project (WLS) prepared interactive CD-ROM discs containing about 50 hours of instruction and drill in basic skills presented within the context of the textile/apparel manufacturing industry. The project was conducted at a Sara Lee knit products plant in North Carolina. During the project, literacy task analyses were…

  13. Project HEED. Final Evaluation Report, 1974-1975.

    ERIC Educational Resources Information Center

    Edington, Everett D.; Pettibone, Timothy J.

    Project HEED's (Heed Ethnic Education Deplorization) main emphasis in 1974-75 was to develop reading and cultural awareness skills for kindergarten through 4th grades in the 7 project schools on American Indian reservations in Arizona. In its 4th year of operation, the project (funded under Elementary and Secondary Education Title III) involved…

  14. Evaluation of the Appalachian Regional Commission's Educational Projects: Final Report.

    ERIC Educational Resources Information Center

    Silverstein, Gary; Bartfai, Nicole; Plishker, Laurie; Snow, Kyle; Frechtling, Joy

    This report presents findings from an evaluation of 84 educational projects funded by the Appalachian Regional Commission (ARC) during the 1990's. Data were collected via document reviews, interviews, a mail survey completed by 78 projects, and eight site visits. Most projects provided services to rural areas or community segments most in need.…

  15. Lower Merrimack Valley Workplace Education Project. Final Report.

    ERIC Educational Resources Information Center

    Norris, Cynthia Zylkuski; Breen, Patricia K.

    A description is provided of the Lower Merrimack Valley Workplace Education Project (WEP), an educational project that offers English-as-a-Second-Language (ESL) and job-specific education classes to hourly employees in the Semiconductor Division of Alpha Industries. The challenge of the project was to create a WEP that could accommodate the…

  16. Galaxy Classroom Project Evaluation, Language Arts, Grades 3-5. Final Report.

    ERIC Educational Resources Information Center

    Guth, Gloria J. A.; Block, Clifford

    The GALAXY Language Arts Demonstration Program is a package of integrated curricular and instructional approaches that features the organization of instruction around themes presented through television broadcasts, children's literature, classroom activities, and the use of interactive technology. During the GALAXY Project demonstration phase for…

  17. Development for Independent and Group Learning in a Core Curriculum. Final Project Report.

    ERIC Educational Resources Information Center

    Saint Anselm's Coll., Manchester, NH. School of Nursing.

    The Department of Nursing of St. Anselm's College undertook a project designed to improve the curriculum and instructional design of the nursing program. The general objective was to develop and revise learning packages by providing supportive and technical assistance to the faculty. The following tasks were accomplished: development of learning…

  18. Project: Informal Learning Program (ILP). Final Report for November 1, 1977 to May 31, 1978.

    ERIC Educational Resources Information Center

    Williams, David L., Jr.; And Others

    This final report describes the development and field evaluation of teacher training materials (for inservice workshops) and elementary school language arts materials. The basic goal of the training materials, called Teacher Development Packages (TDPs), was to provide teachers with the information and skills needed to utilize games and informal…

  19. Hawaii Demonstration Project to Avert Unintended Teenage Pregnancy: 1978-1982. Final Report. Executive Summary.

    ERIC Educational Resources Information Center

    Levitt-Merin, Marta; Sutter, Sharon Kingdon

    This final report provides a descriptive overview of three approaches which the Hawaii Demonstration Project initiated to reduce unintended teenage pregnancies. Project evaluation findings are summarized; both qualitative and quantitative data are presented for a comprehensive picture of the project and its input. Project limitations and successes…

  20. 76 FR 81011 - Notice of Final Federal Agency Actions on Proposed Light Rail Project in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Light Rail Project in... meaning of 23 U.S.C. 139(l)(1). The actions relate to the East Link Light Rail Transit Project in King... approvals for the following project in the State of Washington: East Link Light Rail Transit Project,...

  1. Hawaii Demonstration Project to Avert Unintended Teenage Pregnancy: 1978-1982. Final Report. Executive Summary.

    ERIC Educational Resources Information Center

    Levitt-Merin, Marta; Sutter, Sharon Kingdon

    This final report provides a descriptive overview of three approaches which the Hawaii Demonstration Project initiated to reduce unintended teenage pregnancies. Project evaluation findings are summarized; both qualitative and quantitative data are presented for a comprehensive picture of the project and its input. Project limitations and successes…

  2. El Paso County Geothermal Project at Fort Bliss. Final Project Report

    SciTech Connect

    Lear, Jon; Bennett, Carlon; Lear, Dan; Jones, Phil L.; Burdge, Mark; Barker, Ben; Segall, Marylin; Moore, Joseph; Nash, Gregory; Jones, Clay; Simmons, Stuart; Taylor, Nancy

    2016-02-01

    The El Paso County Geothermal Project at Fort Bliss was an effort to determine the scale and scope of geothermal resources previously identified on Fort Bliss’ McGregor Range in southern Otero County, New Mexico. The project was funded with a $5,000,000 grant to El Paso County from the U.S. Department of Energy (DOE) as part of the American Recovery and Reinvestment Act of 2009 and a $4,812,500 match provided by private sector partners. The project was administered through the DOE Golden Field Office to awardee El Paso County. The primary subcontractor to El Paso County and project Principal Investigator - Ruby Mountain Inc. (RMI) of Salt Lake City, Utah - assembled the project team consisting of Evergreen Clean Energy Management (ECEM) of Provo, Utah, and the Energy & Geoscience Institute at the University of Utah (EGI) in Salt Lake City, UT to complete the final phases of the project. The project formally began in May of 2010 and consisted of two preliminary phases of data collection and evaluation which culminated in the identification of a drilling site for a Resource Confirmation Well on McGregor Range. Well RMI 56-5 was drilled May and June 2013 to a depth of 3,030 ft. below ground level. A string of slotted 7 inch casing was set in 8.75 inch hole on bottom fill at 3,017 ft. to complete the well. The well was drilled using a technique called flooded reverse circulation, which is most common in mineral exploration. This technique produced an exceptionally large and complete cuttings record. An exciting development at the conclusion of drilling was the suspected discovery of a formation that has proven to be of exceptionally high permeability in three desalinization wells six miles to the south. Following drilling and preliminary testing and analysis, the project team has determined that the McGregor Range thermal anomaly is large and can probably support development in the tens of megawatts.

  3. Salton Sea Scientific Drilling Project Archival Reference, Final Draft

    SciTech Connect

    1991-03-13

    This report provides an archival reference to the scientific information and other pertinent documents and materials associated with the Salton Sea Scientific Drilling Project (SSDP). This archiving process ensures that valuable technical data and information obtained during the life of the project can be retrieved, organized and maintained as a historical record for future reference. This paper describes the background of the project and the process used for archiving the materials. [DJE-2005

  4. Final Report for NMBSA Project, Monika Kaden, 2016

    SciTech Connect

    Ward, William Carl

    2016-12-13

    The following pages define the objectives and results for Project 022, requested by Monika Kaden, a sculptor who maintains studios in Santa Fe. This effort was first approved in February 2016, and was completed during several different time segments spread over the year, depending on Monika’s availability. The project deliverables that are of primary use to the customer are digital data files that are to be delivered electronically. This report is a summary overview of how the project was conducted.

  5. Saudi Arabian seismic deep-refraction profiles; final project report

    USGS Publications Warehouse

    Healy, J.H.; Mooney, W.D.; Blank, H.R.; Gettings, M.E.; Kohler, W.M.; Lamson, R.J.; Leone, L.E.

    1983-01-01

    In February 1978 a seismic deep-refraction profile was recorded by the U.S. Geological Survey along a 1000-km line across the Arabian Shield in western Saudi Arabia. The line begins in Mesozoic cover rocks near Riyadh on the Arabian Platform, leads southwesterly across three major Precambrian tectonic provinces, traverses Cenozoic rocks of the coastal plain near Jizan (Tihamat-Asir), and terminates at the outer edge of the Farasan Bank in the southern Red Sea. More than 500 surveyed recording sites were occupied, including 19 in the Farasan Islands. Six shot points were used: five on land, with most charges placed below the water table in drill holes, and one at sea, with charges placed on the sea floor and detonated from a ship. Slightly more than 61 metric tons of explosives were used in 19 discrete firings. Seismic energy was recorded by 100 newly-developed portable seismic stations deployed in approximately 200 km-long arrays for each firing. Each station consisted of a standard 2-Hz vertical component geophone coupled to a self-contained analog recording instrument equipped with a magnetic-tape cassette. In this final report, we fully document the field and data-processing procedures and present the final seismogram data set as both a digital magnetic tape and as record sections for each shot point. Record sections include a normalized set of seismograms, reduced at 6 km/s, and a true-amplitude set, reduced at 8 km/s, which have been adjusted for amplifier gain, individual shot size, and distance from the shot point. Appendices give recorder station and shot information, digital data set descriptions, computer program listings, arrival times used in the interpretation, and a bibliography of reports published as a result of this project. We used two-dimensional ray-tracing techniques in the data analysis, and our interpretation is based primarily on horizontally layered models. The Arabian Shield is composed, to first-order, of two layers, each about 20 km

  6. Encoal mild coal gasification project: Encoal project final report, July 1, 1997--July 31, 1997

    SciTech Connect

    1997-07-01

    This document is the summative report on the ENCOAL Mild Coal Gasification Project. It covers the time period from September 17, 1990, the approval date of the Cooperative Agreement between ENCOAL and the US Department of Energy (DOE), to July 17, 1997, the formal end of DOE participation in the Project. The Cooperative Agreement was the result of an application by ENCOAL to the DOE soliciting joint funding under Round III of the Clean Coal Technology Program. By June 1992, the ENCOAL Plant had been built, commissioned and started up, and in October 1994, ENCOAL was granted a two-year extension, carrying the project through to September 17, 1996. No-cost extensions have moved the Cooperative Agreement end date to July 17, 1997 to allow for completion of final reporting requirements. At its inception, ENCOAL was a subsidiary of Shell Mining Company. In November 1992, Shell Mining Company changed ownership, becoming a subsidiary of Zeigler Coal Holding Company (Zeigler) of Fairview Heights, Illinois. Renamed successively as SMC Mining Company and then Bluegrass Coal Development Company, it remained the parent entity for ENCOAL, which has operated a 1,000-ton/day mild coal gasification demonstration plant near Gillette, Wyoming for nearly 5 years. ENCOAL operates at the Buckskin Mine owned by Triton Coal Company (Triton), another Zeigler subsidiary.

  7. Cooperative Developmental Energy Project. Final Report of Phase I.

    ERIC Educational Resources Information Center

    Halachmi, Arie

    This report provides a summary and description of the activities performed during Phase I (August 1983 to July 1984) of the Cooperative Developmental Energy Project of Tennessee State University. The major intent of the project was to develop a plan of action for enhancing employment and career mobility of minorities in the energy industry.…

  8. Multiple Intelligences: Curriculum and Assessment Project. Final Report

    ERIC Educational Resources Information Center

    Hyland, Aine, Ed.

    2011-01-01

    The "Multiple Intelligences, Curriculum and Assessment Project" at University College Cork was a collaborative project carried out between 1995 and 1999. The key research question focused on whether Howard Gardner's theory of Multiple Intelligences could be applied to, and enhance, aspects of curriculum and assessment at primary and…

  9. Project Aprendizaje. Final Evaluation Report 1992-93.

    ERIC Educational Resources Information Center

    Clark, Andrew

    This report provides evaluative information regarding the effectiveness of Project Aprendizaje, a New York City program that served 269 Spanish-speaking students of limited English proficiency (LEP). The project promoted parent and community involvement by sponsoring cultural events, such as a large Latin American festival. Students developed…

  10. Metropolitan Planning Project, 1977-78. Final Performance Report.

    ERIC Educational Resources Information Center

    Arnoff, Steven M.

    This document provides a description of the Metropolitan Planning Project (MPP), its objectives, strategies, and an evaluation of its implementation in the Boston area. In order to encourage the voluntary elimination, reduction, and prevention of minority group isolation in elementary and secondary schools in Boston, the project focuses on two…

  11. Competency-Based Adult Vocational Education Project. Final Report.

    ERIC Educational Resources Information Center

    Auburn Univ., AL. Dept. of Vocational and Adult Education.

    This applied project recognized the priority to identify, describe, and evaluate existing vocational education programs that are coordinated with the adult performance level (APL) competency based approach. Furthermore, the project supported the value of developing and testing one or more models for APL/vocational education interface. In order to…

  12. A Program Evaluation Manual for Project Initiators. Final Report.

    ERIC Educational Resources Information Center

    Senf, Gerald; Anderson, David

    Intended for directors of special education projects, the manual provides guidelines for program evaluation. It is explained that the manual developed out of the experiences of the staff of the Leadership Training Institute in Learning Disabilities which provided technical assistance to 43 state projects. The manual's eight major sections focus on…

  13. DPI Gender Equity Leadership Project - Phase II. Final Report.

    ERIC Educational Resources Information Center

    Riley, Linda L.

    This report documents a project to provide technical assistance, coordination, training, and resources to programs implementing the Wisconsin Model for Sex Equity in Career and Vocational Education. It describes how technical assistance was provided to all school districts served through a consortium and three special projects. Other project…

  14. Achievement Motivation Development Project. Final Report. Appendix IV, Part 2.

    ERIC Educational Resources Information Center

    McClelland, David C.; Alschuler, Alfred S.

    The Achievement Motivation Development Project is described. The Project has culminated in the development of course materials designed explicitly to promote aspects of psychological growth. As such, it is viewed as but one thrust in an emerging psychological education movement. Achievement motivation is defined as a way of planning, a set of…

  15. Lower Columbia River Terminal Fisheries Research Project : Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-04-01

    This notice announces BPA`S`s decision to fund the Oregon Department of Fish and Wildlife (ODFW), the Washington Department of Fish and Wildlife (WDFW), and the Clatsop Economic Development Committee for the Lower Columbia River Terminal Fisheries Research Project (Project). The Project will continue the testing of various species/stocks, rearing regimes, and harvest options for terminal fisheries, as a means to increase lower river sport and commercial harvest of hatchery fish, while providing both greater protection of weaker wild stocks and increasing the return of upriver salmon runs to potential Zone 6 Treaty fisheries. The Project involves relocating hatchery smolts to new, additional pen locations in three bays/sloughs in the lower Columbia River along both the Oregon and Washington sides. The sites are Blind Slough and Tongue Point in Clatsop County, Oregon, and Grays Bay/Deep River, Wahkiakum County, Washington. The smolts will be acclimated for various lengths of time in the net pens and released from these sites. The Project will expand upon an existing terminal fisheries project in Youngs Bay, Oregon. The Project may be expanded to other sites in the future, depending on the results of this initial expansion. BPA`S has determined the project is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required, and BPA`S is issuing this FONSI.

  16. Research and Development Project in Career Education. [Pennsylvania]. Final Report.

    ERIC Educational Resources Information Center

    Struck, John W.; Curtis, Carroll A.

    The report covers career education activities at four Pennsylvania project sites (Ebensberg, Crawford County, Philadelphia, and McKeesport): an elementary, a junior high, a K-12, and a 10-14 component. Project TIMES (Temporally Individualized Modular Education Scheduling) was incorporated in the 10-14 component at an area vocational-technical…

  17. Metropolitan Planning Project, 1977-78. Final Performance Report.

    ERIC Educational Resources Information Center

    Arnoff, Steven M.

    This document provides a description of the Metropolitan Planning Project (MPP), its objectives, strategies, and an evaluation of its implementation in the Boston area. In order to encourage the voluntary elimination, reduction, and prevention of minority group isolation in elementary and secondary schools in Boston, the project focuses on two…

  18. Project Emerge, Dayton, Ohio. 1972-73 Final Evaluation Report.

    ERIC Educational Resources Information Center

    Dayton City School District, OH.

    Project Emerge, funded under Title VIII of the 1965 Elementary Secondary Education Act, is located in the Model Cities Area, a black-inhabited west side section of Dayton, Ohio. The target school student population is 2,300 of which 20 percent come from families with low incomes. Project Emerge's major objectives are to reduce the dropout rate in…

  19. Project MACK. Final Evaluation Report 1974-1975.

    ERIC Educational Resources Information Center

    Adwere-Boamah, Joseph

    Project MACK's major goal was to provide a comprehensive school program at McClymonds High School in Oakland, California that would reduce the dropout rate, improve student achievement, reduce absenteeism and class-cutting, and improve student attitudes toward school. Project components included 1) Career Cluster Program, which focused on work…

  20. Project MAVE - Model for Articulated Vocational Education. Final Report.

    ERIC Educational Resources Information Center

    Vanek, Carol

    Based on the need to strengthen articulation activities within the Illinois educational system, this project was designed to provide a formal articulation mechanism utilizing the concept of institutional coordination for the development of comprehensive vocational programs and services. Phase 1 of the project developed an articulation process…

  1. Incentives in Education Project, Impact Evaluation Report. Final Report.

    ERIC Educational Resources Information Center

    Planar Corp., Washington, DC.

    This report describes results of a demonstration project carried out in four cities during 1971-72. The project aimed at exploring the feasibility and impact of two different forms of money incentives payments. In one form -- the "Teacher-Only" model -- the teachers in a school were offered a series of bonuses ranging from $150 to $600 per class…

  2. Skill Standards and Certification Project. Final Detailed Report. Year Two.

    ERIC Educational Resources Information Center

    North Lake Coll., Irving, TX.

    This document reports on the second year of a project conducted to design a seamless training application model for infusing workplace skills into academic and occupational programs at the secondary, postsecondary, and apprenticeship level using the components of SCANS (Secretary's Commission on Achieving Necessary Skills). For this pilot project,…

  3. The Ninos Especiales Outreach Training Project (NEOTP). Final Report.

    ERIC Educational Resources Information Center

    Bruder, Mary Beth; And Others

    The Ninos Especiales Outreach Training Project was a 3-year federally funded project to provide information, training, and evaluation related to a culturally sensitive, family-focused model of early intervention services for infants with severe disabilities and their families of Puerto Rican heritage. Implementation occurred through three major…

  4. Faces of Change Series. Documentary Film Project: Final Report.

    ERIC Educational Resources Information Center

    Miller, Norman N.

    The objectives of the Educational Materials Project were to produce print materials to accompany "The Faces of Change," a series of 26 films and some 60 essays and instructional documents produced for college classes between 1972 and 1975. The scope of the project covered two film production grants, a grant for archiving uncut footage at…

  5. The Lanai Visitor Serving Workplace Literacy Project: Final Performance Report.

    ERIC Educational Resources Information Center

    Hawaii Human Development, Honolulu.

    This report describes the outcomes of a project designed to aid agricultural workers in their transition to hotel jobs. Displaced workers (predominantly Filipino) from a Dole plantation were forced to seek employment in new resorts on Lanai. The goals of the project were to: (1) qualify former Dole employees for jobs in the newly-developed resort…

  6. Honey Lake Geothermal Project, Lassen County, California. Final technical report

    SciTech Connect

    Not Available

    1984-11-01

    This report discusses the drilling, completion, and testing of deep well WEN-2 for a hybrid electric power project which will use the area's moderate temperature geothermal fluids and locally procured wood fuel. The project is located within the Wendel-Amedee Known Geothermal Resource Area. (ACR)

  7. Achievement Motivation Development Project. Final Report. Appendix IV, Part 2.

    ERIC Educational Resources Information Center

    McClelland, David C.; Alschuler, Alfred S.

    The Achievement Motivation Development Project is described. The Project has culminated in the development of course materials designed explicitly to promote aspects of psychological growth. As such, it is viewed as but one thrust in an emerging psychological education movement. Achievement motivation is defined as a way of planning, a set of…

  8. Project Closeout: Guidance for Final Evaluation of Building America Communities

    SciTech Connect

    Norton, P.; Burch, J.; Hendron, B.

    2008-03-01

    This report presents guidelines for Project Closeout. It is used to determine whether the Building America program is successfully facilitating improved design and practices to achieve energy savings goals in production homes. Its objective is to use energy simulations, targeted utility bill analysis, and feedback from project stakeholders to evaluate the performance of occupied BA communities.

  9. Biology Laboratory Construction Kit with Intelligent Tutor. Final Project Report.

    ERIC Educational Resources Information Center

    Peterson, Nils S.; And Others

    This project developed a new kind of computer simulation and explored its impact on teaching and learning in introductory biology. The aims of the project were to: (1) develop a flexible simulation environment that would permit students to design, build, and test realistic simulations; (2) support student experimentation with intelligent tutoring…

  10. Project GROW [Green River Opportunities for Work]: Final Report.

    ERIC Educational Resources Information Center

    Vikers, Theo; Gibson, Melvin Pat

    Summarizing the progress of Project Green River Opportunities for Work (Project GROW), the document reviews the study's background and the activities resulting from a third party evaluation by the Southern Association of Colleges and Schools. Objectives based on the evaluation and recommendations included: (1) development of an articulated and…

  11. A Project to Determine the Employability of Epileptics. Final Report.

    ERIC Educational Resources Information Center

    EPI-HAB Phoenix, Inc., AZ.

    A demonstration project (1958-1961) was conducted to establish that a self-sustaining workshop for epileptics can maintain itself competitively and be a viable rehabilitative setting for the epileptic midway between one employable in private industry and one employable only in a sheltered workshop. An EPI-HAB project in Phoenix, Arizona,…

  12. Parent Imprisonment and Child Socialization Research Project. Final Report.

    ERIC Educational Resources Information Center

    Howard Univ., Washington, DC. Dept. of Psychology.

    Conducted in response to the 7% increase in black female single-parent families during 1970 to 1975, this project systematically investigates the impact of parent-absence on the socialization of black children. Divided into four separate studies, the project concentrates on (1) community-social variables related to black parent-absent families;…

  13. Bilingual Education Project, Santa Clara County, California. Final Report, 1972.

    ERIC Educational Resources Information Center

    Santa Clara County Office of Education, San Jose, CA.

    The Spanish Dame Bilingual Education Project, located in Santa Clara County, California, served 190 children who came from homes where the primary language was Spanish and who resided within the target area schools of the Alum Rock School District. The objectives of the preschool project were (1) to demonstrate a home-teaching procedure designed…

  14. Automobile Mechanic Training Evaluation Project (AMTEP) Final Report.

    ERIC Educational Resources Information Center

    Losh, Charles

    A project was undertaken to identify, develop, and validate those performance, program, and personal standards judged necessary to operate and evaluate a quality automobile mechanic/technician training program. Included among the project activities were the following: (1) a review of existing literature on performance and program standards; (2)…

  15. Project HEED, Title III, Section 306. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Hughes, Orval D.

    Project HEED (Heed Ethnic Educational Depolarization) involves over 1,000 Indian children in grades 1-8 in Arizona. The project target sites are 48 classrooms at Sells, Topowa, San Carlos, Many Farms, Hotevilla, Peach Springs, and Sacaton. Objectives are to increase: (1) reading achievement, (2) affective behavior of teachers, (3) motivation by…

  16. Project HEED. Final Evaluation Report, 1973-74.

    ERIC Educational Resources Information Center

    Edington, Everett D.; Pettibone, Timothy

    1973-74 approximately 1,100 Indian students in grades 1 through 8 participated in Project HEED (Heed Ethnic Educational Depolarization) in Arizona. The project target sites were 59 classrooms at Sacaton, Sells, Peach Springs, San Carlos, Topowa, Many Farms, St. Charles Mission, and Hoteville. Primary objectives were: (1) improvement in reading…

  17. Parent Imprisonment and Child Socialization Research Project. Final Report.

    ERIC Educational Resources Information Center

    Howard Univ., Washington, DC. Dept. of Psychology.

    Conducted in response to the 7% increase in black female single-parent families during 1970 to 1975, this project systematically investigates the impact of parent-absence on the socialization of black children. Divided into four separate studies, the project concentrates on (1) community-social variables related to black parent-absent families;…

  18. KICKAPOO - NORTH CANADIAN PROJECT, 1966-67. FINAL REPORT.

    ERIC Educational Resources Information Center

    KEELY, SUZANN

    SEVENTY-ONE CHILDREN WERE ENROLLED IN THE KICKAPOO-NORTH CANADIAN PROJECT FOR A PERIOD OF 2 MONTHS OR LONGER. THIS REPORT IS DIVIDED INTO 7 SECTIONS AND 2 APPENDICES. PART I CONTAINS A DESCRIPTION OF THE PROGRESS OF EACH CHILD DURING THE PROJECT. PART II CONTAINS BIOGRAPHICAL DESCRIPTIONS OF THE STAFF. PART III CONTAINS A LIST OF SPECIAL…

  19. A Project for Research, Development, and Evaluation Training. Final Report.

    ERIC Educational Resources Information Center

    Karr, Chadwick; Porter, Bette C.

    This report summarizes and evaluates the 1969-70 Consortium Research Development (CORD) training and dissemination project conducted by Teaching Research, Oregon State System of Higher Education. The project provided a 2-week summer institute to train selected college and university staff from CORD institutions in the use of individualized,…

  20. The Lanai Visitor Serving Workplace Literacy Project: Final Performance Report.

    ERIC Educational Resources Information Center

    Hawaii Human Development, Honolulu.

    This report describes the outcomes of a project designed to aid agricultural workers in their transition to hotel jobs. Displaced workers (predominantly Filipino) from a Dole plantation were forced to seek employment in new resorts on Lanai. The goals of the project were to: (1) qualify former Dole employees for jobs in the newly-developed resort…

  1. Rural Workplace Literacy Demonstration Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Enterprise State Junior Coll., AL.

    In April 1991, Enterprise State Junior College and MacArthur State Technical College established a rural workplace literacy demonstration project in partnership with adult basic education, seven employers, and a labor organization. The project served 615 persons in classes offered at the 2 colleges, 4 partner locations, and 3 additional worksites.…

  2. Tech Prep Intergenerational Curriculum Development Project. Final Report.

    ERIC Educational Resources Information Center

    Texas Tech Univ., Lubbock.

    A project was conducted at Texas Tech University to develop a competency-based curriculum to support statewide implementation of tech prep intergenerational programs (careers in providing services to well elderly persons and to children). Project activities included the following: (1) revision and expansion of the Intergenerational Target…

  3. Project Familia. Final Evaluation Report, 1992-93. OREA Report.

    ERIC Educational Resources Information Center

    Clarke, Candice

    Project Familia was an Elementary and Secondary Education Act Title VII funded project that, in the year covered by this evaluation, served 41 special education students of limited English proficiency (LEP) from 5 schools, with the participation of 54 parents and 33 siblings. Participating students received English language enrichment and…

  4. Manufacturing Technology Continuation Project--FY 92. Final Report.

    ERIC Educational Resources Information Center

    Chicago City Colleges, IL. Richard J. Daley Coll.

    A project to identify metalworking subsectors (multiple spindle screw machining and gears machining) for inclusion in the Manufacturing Technology Preparation Program is the subject of this report. The project accomplished the following: developed five courses in multiple spindle, secured large donations of equipment and tooling, established a…

  5. Mobile County Public Schools Career Education Project. Final Report.

    ERIC Educational Resources Information Center

    Pope, Henry H.

    Objectives, project personnel, procedures, accomplishments, and problems of the Mobile County (Alabama) three-year career education project are described in the report. Successive reductions in funding severely handicappped implementation of the model program in the large county school system. Two major accomplishments during 1974-75 emphasized…

  6. Corrosion test on candidate waste package basket materials for the Yucca Mountain project

    SciTech Connect

    Van Konynenburg, R.A.; Curtis, P.G.

    1996-01-01

    A scoping corrosion test was performed on candidate waste package basket materials in order to assist in selecting materials for package design and to help in designing longer-term corrosion tests. The corrosion solution was buffered near pH4, was in contact with air, and contained chemical species expected to be produced by radiolysis. The test was conducted at 90 C for 96 hours. Samples included aluminum-, copper-, stainless steel-, and zirconium-based metallic materials and several ceramics, incorporating neutron absorber elements. Sample weight losses and solution chemical changes were measured. Both corrosion of the host materials and dissolution of the neutron absorber elements were studied.

  7. Post-closure performance assessment of waste packages for the Yucca Mountain Project

    SciTech Connect

    O`Connell, W.J.; Ueng, T.S.; Lewis, L.C.

    1993-10-01

    This report details a system model of some core features of the performance of waste packages for the permanent disposal of spent nuclear fuel at the Yucca Mountain Site. The model is realized in the prototype computer program PANDORA-1.1. The PANDORA system model links processes leading to possible release of radionuclides from the waste package. The PANDORA submodels are being developed for processes and conditions specific to this potential repository site, notably the comparatively dry location in an arid area and well above the groundwater table, and the rock medium of porous partially welded tuff.

  8. Austin Children`s Museum ``Go Power`` project. Final report

    SciTech Connect

    Not Available

    1993-10-01

    Go Power, was conceived as an interactive exhibit and related set of activities designed to promote in children and families an understanding and appreciation of energy concepts. Planned in 1990, the project culminated its first phase of activities with colorful, interactive exhibit about the pathways and transformations of energy, on display at the Austin Children`s Museum between February 5th and June 6th, 1993. The project was supported by the US Department of Energy, the National Science Foundation, the Lower Colorado River Authority and various local foundations and businesses. This report describes the process, product and outcomes of this project.

  9. Keweenaw Bay Indian Community Weatherization Training Project Final Report

    SciTech Connect

    Denomie, Lawrence J.; LaPointe, Bruce

    2012-03-26

    The objective of the project is to train the appropriate staff, both new and existing from various KBIC Departments in the core competencies needed to develop a comprehensive Tribal community weatherization program. The goal of the project was to build the staff capacity to enable the KBIC to establish a Tribal weatherization program that promotes energy sufficiency throughout the Tribal community. The project addresses the needs identified in the 2008 KBIC Strategic Energy Plan to build the staff capacity and increase the knowledge base within the Tribal Departments and to implement an energy efficiency program through community education and financial assistance incentives.

  10. Final Report for Project FG02-05ER25685

    SciTech Connect

    Xiaosong Ma

    2009-05-07

    In this report, the PI summarizes the results and achievements obtained in the sponsored project. Overall, the project has been very successful and produced both research results in massive data-intensive computing and data management for large scale supercomputers today, and in open-source software products. During the project period, 14 conference/journal publications, as well as two PhD students, have been produced due to exclusive or shared support from this award. In addition, the PI has recently been granted tenure from NC State University.

  11. Sibanye Methods for Prevention Packages Program Project Protocol: Pilot Study of HIV Prevention Interventions for Men Who Have Sex With Men in South Africa.

    PubMed

    McNaghten, Ad; Kearns, Rachel; Siegler, Aaron J; Phaswana-Mafuya, Nancy; Bekker, Linda-Gail; Stephenson, Rob; Baral, Stefan D; Brookmeyer, Ron; Yah, Clarence S; Lambert, Andrew J; Brown, Benjamin; Rosenberg, Eli; Blalock Tharp, Mondie; de Voux, Alex; Beyrer, Chris; Sullivan, Patrick S

    2014-10-16

    Human immunodeficiency virus (HIV) prevention intervention programs and related research for men who have sex with men (MSM) in the southern African region remain limited, despite the emergence of a severe epidemic among this group. With a lack of understanding of their social and sexual lives and HIV risks, and with MSM being a hidden and stigmatized group in the region, optimized HIV prevention packages for southern African MSM are an urgent public health and research priority. The objective of the Sibanye Health Project is to develop and evaluate a combination package of biomedical, behavioral, and community-level HIV prevention interventions and services for MSM in South Africa. The project consists of three phases: (1) a comprehensive literature review and summary of current HIV prevention interventions (Phase I), (2) agent-based mathematical modeling of HIV transmission in southern African MSM (Phase II), and (3) formative and stigma-related qualitative research, community engagement, training on providing health care to MSM, and the pilot study (Phase III). The pilot study is a prospective one-year study of 200 men in Cape Town and Port Elizabeth, South Africa. The study will assess a package of HIV prevention services, including condom and condom-compatible lubricant choices, risk-reduction counseling, couples HIV testing and counseling, pre-exposure prophylaxis (PrEP) for eligible men, and non-occupational post-exposure prophylaxis for men with a high risk exposure. The pilot study will begin in October 2014. Preliminary results from all components but the pilot study are available. We developed a literature review database with meta-data extracted from 3800 documents from 67 countries. Modeling results indicate that regular HIV testing and promotion of condom use can significantly impact new HIV infections among South African MSM, even in the context of high coverage of early treatment of HIV-positive men and high coverage of PrEP for at-risk HIV

  12. Sibanye Methods for Prevention Packages Program Project Protocol: Pilot Study of HIV Prevention Interventions for Men Who Have Sex With Men in South Africa

    PubMed Central

    Kearns, Rachel; Siegler, Aaron J; Phaswana-Mafuya, Nancy; Bekker, Linda-Gail; Stephenson, Rob; Baral, Stefan D; Brookmeyer, Ron; Yah, Clarence S; Lambert, Andrew J; Brown, Benjamin; Rosenberg, Eli; Blalock Tharp, Mondie; de Voux, Alex; Beyrer, Chris; Sullivan, Patrick S

    2014-01-01

    Background Human immunodeficiency virus (HIV) prevention intervention programs and related research for men who have sex with men (MSM) in the southern African region remain limited, despite the emergence of a severe epidemic among this group. With a lack of understanding of their social and sexual lives and HIV risks, and with MSM being a hidden and stigmatized group in the region, optimized HIV prevention packages for southern African MSM are an urgent public health and research priority. Objective The objective of the Sibanye Health Project is to develop and evaluate a combination package of biomedical, behavioral, and community-level HIV prevention interventions and services for MSM in South Africa. Methods The project consists of three phases: (1) a comprehensive literature review and summary of current HIV prevention interventions (Phase I), (2) agent-based mathematical modeling of HIV transmission in southern African MSM (Phase II), and (3) formative and stigma-related qualitative research, community engagement, training on providing health care to MSM, and the pilot study (Phase III). The pilot study is a prospective one-year study of 200 men in Cape Town and Port Elizabeth, South Africa. The study will assess a package of HIV prevention services, including condom and condom-compatible lubricant choices, risk-reduction counseling, couples HIV testing and counseling, pre-exposure prophylaxis (PrEP) for eligible men, and non-occupational post-exposure prophylaxis for men with a high risk exposure. The pilot study will begin in October 2014. Results Preliminary results from all components but the pilot study are available. We developed a literature review database with meta-data extracted from 3800 documents from 67 countries. Modeling results indicate that regular HIV testing and promotion of condom use can significantly impact new HIV infections among South African MSM, even in the context of high coverage of early treatment of HIV-positive men and high

  13. Final report on LDRD project "proliferation-resistant fuel cycles"

    SciTech Connect

    Brown, N W; Hassberger, J A

    1999-02-25

    This report provides a summary of LDRD work completed during 1997 and 1998 to develop the ideas and concepts that lead to the Secure, Transportable, Autonomous Reactor (STAR) program proposals to the DOE Nuclear Energy Research Initiative (NERI). The STAR program consists of a team of three national laboratories (LLNL, ANL, and LANL), three universities, (UC Berkeley, TAMU, and MIT) and the Westinghouse Research Center. Based on the LLNL work and their own efforts on related work this team prepared and integrated a package of twelve proposals that will carry the LDRD work outlined here into the next phase of development. We are proposing to develop a new nuclear system that meets stringent requirements for a high degree of safety and proliferation resistance, and also deals directly with the related nuclear waste and spent fuel management issues.

  14. Final Design Report for the RH LLW Disposal Facility (RDF) Project

    SciTech Connect

    Austad, S. L.

    2015-05-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  15. Final Design Report for the RH LLW Disposal Facility (RDF) Project

    SciTech Connect

    Austad, Stephanie Lee

    2015-09-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  16. Final Project Report for "Interfacial Thermal Resistance of Carbon Nanotubes”

    SciTech Connect

    Cumings, John

    2016-04-15

    This report describes an ongoing project to comprehensively study the interfacial thermal boundary resistance (Kapitza resistance) of carbon nanotubes. It includes a list of publications, personnel supported, the overall approach, accomplishments and future plans.

  17. Legacy sample disposition project. Volume 2: Final report

    SciTech Connect

    Gurley, R.N.; Shifty, K.L.

    1998-02-01

    This report describes the legacy sample disposition project at the Idaho Engineering and Environmental Laboratory (INEEL), which assessed Site-wide facilities/areas to locate legacy samples and owner organizations and then characterized and dispositioned these samples. This project resulted from an Idaho Department of Environmental Quality inspection of selected areas of the INEEL in January 1996, which identified some samples at the Test Reactor Area and Idaho Chemical Processing Plant that had not been characterized and dispositioned according to Resource Conservation and Recovery Act (RCRA) requirements. The objective of the project was to manage legacy samples in accordance with all applicable environmental and safety requirements. A systems engineering approach was used throughout the project, which included collecting the legacy sample information and developing a system for amending and retrieving the information. All legacy samples were dispositioned by the end of 1997. Closure of the legacy sample issue was achieved through these actions.

  18. UNAWE Indonesia project: raising total solar eclipse 2016 awareness through educational packages

    NASA Astrophysics Data System (ADS)

    Handini, A. T.; Yulianty, Y.; Premadi, P. W.; Annafi, A.

    2016-11-01

    On March 9th 2016, some regions in Indonesia witnessed the Total Solar Eclipse (TSE). At that time, Indonesia was the only mainland in the world that could observe TSE. This moment is extraordinary because its probability of being observed at the same point happens every 350 years. On a purpose of raising public awareness and engaging more participations, UNAWE Indonesia developed a handy material and sent the so called educational packages which provided essential information about eclipse, especially TSE. Each package contains of modul of TSE study and materials for simple TSE activity so people who received the package could observe TSE safely. In the delivery of this program, we established a collaboration partner, whom are teachers, as an 'eclipse ambassador'. The local partners were responsible for socializing the information for school or their community. We encouraged them to conduct an observation activity and ask them to fill an evaluation report. As a result, 48 out of 59 partners or equal to 81.3% of all partners has sent the evaluation of the package and documentation of the activity during TSE. They responded positively as it was easy to understand, functional, and convenient.

  19. Vendor Assessment for the Waste Package Closure System (Yucca Mountain Project)

    SciTech Connect

    Shelton-Davis, C.V.

    2003-09-26

    The Idaho National Engineering and Environmental Laboratory (INEEL) has been tasked with developing, designing, constructing, and operating a full-scale prototype of the work package closure system. As a precursor to developing the conceptual design, all commercially available equipment was assessed to identify any existing technology gaps. This report presents the results of that assessment for all major equipment.

  20. Vendor Assessment for the Waste Package Closure System (Yucca Mtn. Project)

    SciTech Connect

    Colleen Shelton-Davis

    2003-09-01

    The Idaho National Engineering and Environmental Laboratory (INEEL) has been tasked with developing, designing, constructing, and operating a full-scale prototype of the work package closure system. As a precursor to developing the conceptual design, all commercially available equipment was assessed to identify any existing technology gaps. This report presents the results of that assessment for all major equipment.

  1. Final Report - Navajo Electrification Demonstration Project - FY2004

    SciTech Connect

    Kenneth L. Craig, Interim General Manager

    2007-03-31

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year projects which addresses the needs of unserved Navajo Nation residents without basic electricity services. The Navajo Nation is the United States' largest tribe, in terms of population and land. An estimated 18,000 Navajo Nation homes do not have basic grid-tied electricity--and this third year of funding, known as NEDP-3, provided 351 power line extensions to Navajo families.

  2. Final Project Report: A Polyhedral Transformation Framework for Compiler Optimization

    SciTech Connect

    Sadayappan, Ponnuswamy; Rountev, Atanas

    2015-06-15

    The project developed the polyhedral compiler transformation module PolyOpt/Fortran in the ROSE compiler framework. PolyOpt/Fortran performs automated transformation of affine loop nests within FORTRAN programs for enhanced data locality and parallel execution. A FORTAN version of the Polybench library was also developed by the project. A third development was a dynamic analysis approach to gauge vectorization potential within loops of programs; software (DDVec) for automated instrumentation and dynamic analysis of programs was developed.

  3. Development and Validation of a Project Package for Junior Secondary School Basic Science

    ERIC Educational Resources Information Center

    Udofia, Nsikak-Abasi

    2014-01-01

    This was a Research and Developmental study designed to develop and validate projects for Junior Secondary School Basic Science instruction and evaluation. The projects were developed using the project blueprint and sent for validation by experts in science education and measurement and evaluation; using a project validation scale. They were to…

  4. Newberry Geothermal Pilot Project : Final Environmental Impact Statement.

    SciTech Connect

    US Forest Service; US Bureau of Land Management; US Bonneville Power Administration

    1994-09-01

    BPA has decided to acquire 20 average megawatts (aMW) of electrical power from a privately-owned geothermal power plant on the west flank of Newberry Volcano in Deschutes County, Oregon. The Newberry Project will generate 30 aMW and will be developed, owned, and operated by CE Newberry, Inc. of Portland, Oregon. In addition, BPA has decided to grant billing credits to EWEB for 10 aMW of electrical power and to provide wheeling services to EWEB for the transmission of this power to their system. BPA expects the Newberry Project to be in commercial operation by November 1997. BPA has statutory responsibilities to supply electrical power to its utility industrial and other customers in the Pacific Northwest. The Newberry Project will be used to meet the electrical power supply obligations of these customers. The Newberry Project will also demonstrate the availability of geothermal power to meet power supply needs in the Pacific Northwest and is expected to be the first commercial geothermal plant in the region. The Newberry Project was selected under the BPA Geothermal Pilot Project Program. The goal of the Program is to initiate development of the Pacific Northwest`s large, but essentially untapped, geothermal resources, and to confirm the availability of this resource to meet the energy needs of the region. The primary underlying objective of this Program is to assure the supply of alternative sources of electrical power to help meet growing regional power demands and needs.

  5. OECD MCCI project final report, February 28, 2006.

    SciTech Connect

    Farmer, M. T.; Lomperski, S.; Kilsdonk, D. J.; Aeschlimann, R. W.; Basu, S.

    2011-05-23

    -dimensional. Although the MACE Scoping Test was carried out with a two-dimensional concrete cavity, the interaction was flooded soon after ablation was initiated to investigate debris coolability. Moreover, due to the scoping nature of this test, the apparatus was minimally instrumented and therefore the results are of limited value from the code validation viewpoint. Aside from the MACE program, the COTELS test series also investigated 2-D CCI under flooded cavity conditions. However, the input power density for these tests was quite high relative to the prototypic case. Finally, the BETA test series provided valuable data on 2-D core concrete interaction under dry cavity conditions, but these tests focused on investigating the interaction of the metallic (steel) phase with concrete. Due to these limitations, there is significant uncertainty in the partitioning of energy dissipated for the ablation of concrete in the lateral and axial directions under dry cavity conditions for the case of a core oxide melt. Accurate knowledge of this 'power split' is important in the evaluation of the consequences of an ex-vessel severe accident; e.g., lateral erosion can undermine containment structures, while axial erosion can penetrate the basemat, leading to ground contamination and/or possible containment bypass. As a result of this uncertainty, there are still substantial differences among computer codes in the prediction of 2-D cavity erosion behavior under both wet and dry cavity conditions. Thus, a second key aim of the current program was to provide the necessary data to help resolve these modeling differences. In light of the above issues, the OECD-sponsored Melt Coolability and Concrete Interaction (MCCI) program was initiated at Argonne National Laboratory. The project conducted reactor materials experiments and associated analysis to achieve the following technical objectives: (1) resolve the ex-vessel debris coolability issue through a program that focused on providing both confirmatory

  6. Decontamination and dismantlement of the JANUS Reactor at Argonne National Laboratory-East. Project final report

    SciTech Connect

    Fellhauer, C.R.; Clark, F.R.; Garlock, G.A.

    1997-10-01

    The decontamination and dismantlement of the JANUS Reactor at Argonne National Laboratory-East (ANL-E) was completed in October 1997. Descriptions and evaluations of the activities performed and analyses of the results obtained during the JANUS D and D Project are provided in this Final Report. The following information is included: objective of the JANUS D and D Project; history of the JANUS Reactor facility; description of the ANL-E site and the JANUS Reactor facility; overview of the D and D activities performed; description of the project planning and engineering; description of the D and D operations; summary of the final status of the JANUS Reactor facility based upon the final survey results; description of the health and safety aspects of the project, including personnel exposure and OSHA reporting; summary of the waste minimization techniques utilized and total waste generated by the project; and summary of the final cost and schedule for the JANUS D and D Project.

  7. Automatic benchmarking of homogenization packages applied to synthetic monthly series within the frame of the MULTITEST project

    NASA Astrophysics Data System (ADS)

    Guijarro, José A.; López, José A.; Aguilar, Enric; Domonkos, Peter; Venema, Victor; Sigró, Javier; Brunet, Manola

    2017-04-01

    trends; iv) random number of shifts with random size and location in all series; and v) the same plus seasonality of random amplitude. The shifts were additive for temperature and multiplicative for precipitation. The second stage is dedicated to study the impact of the number of series in the networks, seasonalities other than sinusoidal, and the occurrence of simultaneous shifts in a high number of series. Finally, tests will be performed on a longer and more realistic benchmark, with varying number of missing data along time, similar to that used in the COST Action ES0601. These inter-comparisons will be valuable both to the users and to the developers of the tested packages, who can see how their algorithms behave under varied climate conditions.

  8. Staff Helping Attain Relevant Education (Project SHARE): Final Evaluation Report, 1992-93. OREA Report.

    ERIC Educational Resources Information Center

    Ranadive, Jyoti

    Project SHARE (Staff Helping Attain Relevant Education), a project funded by Title VII of the Elementary and Secondary Education Act, was in its third and final year of operation in 1992-93, in eight primary schools in the Bronx, Brooklyn, and Manhattan (New York). The project served 141 limited English proficient students from low-income families…

  9. SELF (Supports for Early Learning Foundations): A Non-Directed Model Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    Harrison, Holly

    This final report describes achievements and activities of Project SELF (Supports for Early Learning Foundations), a federally funded project in New Mexico which developed, evaluated, and replicated an innovative model that provides strategies for early interventionists and families to support early learning foundations. The project identified…

  10. The Indiana Deafblind Services Project: Services for Children with Deafblindness Program. Final Performance Report.

    ERIC Educational Resources Information Center

    Indiana State Univ., Terre Haute. Blumberg Center for Interdisciplinary Studies in Special Education.

    This final report describes activities and accomplishments of the Indiana Deaf-Blind Services Project, a 4-year federally funded project to enhance and further develop coordinated direct services to children and youth, birth through 2 and ages 18 through 21. The project also was designed to provide technical assistance to public and private…

  11. Project I-TIP: Inservice Training for Infant Personnel. Final Report.

    ERIC Educational Resources Information Center

    Freund, Maxine; Rab, Victoria Y.

    This final report describes Project I-TIP (Inservice Training for Infant Personnel), a 3-year project which developed and demonstrated a comprehensive model of inservice training for personnel serving children with handicaps (ages 0-5 years). Specifically the project provided training at 17 sites to over 900 individuals. Training protocols were…

  12. Aberdeen Area Final Evaluation Report, ESEA Title I Project, Fiscal Year 1974.

    ERIC Educational Resources Information Center

    Bureau of Indian Affairs (Dept. of Interior), Aberdeen, SD. Aberdeen Area Office.

    Compiled from the final evaluation reports of 36 direct instruction projects and 1 Area Technical Assistance project (94 percent of which were contracted and administered by American Indian tribes or Indian school boards), this report is a summative evaluation of 1974 Title I projects in North and South Dakota. A brief introduction describes the…

  13. 76 FR 67178 - Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... Energy Regulatory Commission Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement for the Wells Hydrolectric Project In accordance with the National Environmental... reviewed the application for license for the Wells Hydroelectric Project (FERC No. 2149), located on...

  14. Eckerd College Energy Systems Project. Final technical report

    SciTech Connect

    DeGroot, D.E.

    1984-02-06

    The Eckerd College Energy Systems Project (ESP) consisted of four interrelated components: Organic gardening; Aquaculture (Tilapia); Methane gas conversion and utilization as energy source to drive an electric generator; Solar water heating component. These components were designed to demonstrate the feasibility of using alternative technologies to reduce petro-chemical energy dependency, to provide faculty and staff with hands-on A.T. experience, and to involve the general community in A.T. energy experiences. The Organic, Aquaculture and Solar components were successful. The Methane project was not. The educational goals of the project were met or exceeded. It is strongly recommended that DOE/AT support ESP like programs at all educational levels as part of our national commitment to developing an increasing capability for energy self sufficiency in the general population.

  15. UMTRA Surface Project management action process document: Final. Revision 2

    SciTech Connect

    1996-06-01

    Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designed sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project. Since its inception through March 1996, the Surface Project (hereinafter called the Project) has cleaned up 16 of the 24 designated processing sites and approximately 5,000 VPs, reducing the risk to human health and the environment posed by the uranium mill tailings. Two of the 24 sites, Belfield and Bowman, North Dakota, will not be remediated at the request of the state, reducing the total number of sites to 22. By the start of FY1998, the remaining 6 processing sites and associated VPs will be cleaned up. The remedial action activities to be funded in FY1998 by the FY1998 budget request are remediation of the remaining Grand Junction, Colorado, VPs; closure of the Cheney disposal cell in Grand Junction, Colorado; and preparation of the completion reports for 4 completed sites.

  16. FY2003 LDRD Final Annual Report Article: Pathogen Pathway Project

    SciTech Connect

    Fitch, J P; McCutchen-Maloney, S L

    2003-11-10

    Understanding virulence mechanisms of bacterial pathogens is vital to anticipating biological threats and to improving detectors, vaccines, and treatments. This project will characterize factors responsible for virulence of Yersinia pestis, the causative agent of plague and a biothreat agent, which has an inducible Type III secretion virulence mechanism also found in other animal, plant, and human pathogens. Our approach relies on genomic and proteomic characterization of Y. pestis in addition to a bioinformatic infrastructure. Scientific and technical capabilities developed in this project can be applied to other microbes of interest. This work will establish a significant new direction for biodefense at LLNL and expand our national and international scientific collaborations.

  17. Final Report for NA-22/DTRA Cosmic Ray Project

    SciTech Connect

    Wurtz, Ron E.; Chapline, George F.; Glenn, Andrew M.; Nakae, Les F.; Pawelczak, Iwona A.; Sheets, Steven A.

    2015-07-21

    The primary objective of this project was to better understand the time-correlations between the muons and neutrons produced as a result of high energy primary cosmic ray particles hitting the atmosphere, and investigate whether these time correlations might be useful in connection with the detection of special nuclear materials. During the course of this project we did observe weak correlations between secondary cosmic ray muons and cosmic ray induced fast neutrons. We also observed strong correlations between tertiary neutrons produced in a Pb pile by secondary cosmic rays and minimum ionizing particles produced in association with the tertiary neutrons.

  18. Final Reclamation Report: Basalt Waste Isolation Project exploratory shaft site

    SciTech Connect

    Brandt, C.A.; Rickard, W.H. Jr.

    1990-06-01

    The restoration of areas disturbed by activities of the Basalt Waste Isolation Project (BWIP) constitutes a unique operation at the US Department of Energy's (DOE) Hanford Site, both from the standpoint of restoration objectives and the time frame for accomplishing these objectives. The BWIP reclamation program comprises three separate projects: borehole reclamation, Near Surface Test Facility (NSTF) reclamation, and Exploratory Shaft Facility (ESF) reclamation. The main focus of this report is on determining the success of the revegetation effort 1 year after work was completed. This report also provides a brief overview of the ESF reclamation program. 21 refs., 7 figs., 14 tabs.

  19. Final report on the LLNL compact torus acceleration project

    SciTech Connect

    Eddleman, J.; Hammer, J.; Hartman, C.; McLean, H.; Molvik, A.

    1995-03-19

    In this report, we summarize recent work at LLNL on the compact torus (CT) acceleration project. The CT accelerator is a novel technique for projecting plasmas to high velocities and reaching high energy density states. The accelerator exploits magnetic confinement in the CT to stably transport plasma over large distances and to directed kinetic energies large in comparison with the CT internal and magnetic energy. Applications range from heating and fueling magnetic fusion devices, generation of intense pulses of x-rays or neutrons for weapons effects and high energy-density fusion concepts.

  20. Articulation for Allied Health. Final Report. Omnibus Dissemination Project.

    ERIC Educational Resources Information Center

    Havens, Cheryl C.

    There exists in health occupations education, two types of educational institutions. One type prepares students for a certificate, and the other for a degree. The objective of the Articulation Project for Allied Health was to establish and document a procedure by which students with technical certificates could receive college credit, recommending…

  1. MISSOURI ADULT VOCATIONAL-LITERACY MATERIALS DEVELOPMENT PROJECT. FINAL REPORT.

    ERIC Educational Resources Information Center

    HEDING, HOWARD W.; AND OTHERS

    IN THE MISSOURI ADULT VOCATIONAL-LITERACY MATERIALS DEVELOPMENT PROJECT MATERIALS WERE DEVISED FOR TEACHING ADULTS TO READ, WRITE, AND SPELL AT THE FUNCTIONAL (SIXTH GRADE) LEVEL. IN THE RESEARCH PHASE, THE NEEDS, CHARACTERISTICS, LITERACY LEVEL, OCCUPATIONS, AND INTERESTS OF THE ILLITERATE ADULT WERE STUDIED, AND TEACHING MATERIALS AND METHODS…

  2. An International Comparison of Final-Year Design Project Curricula

    ERIC Educational Resources Information Center

    Kentish, Sandra E.; Shallcross, David C.

    2006-01-01

    This paper reviews design teaching at a total of 15 chemical engineering departments across Australia, Singapore, and the United Kingdom. The emphasis is on the capstone Design Project, which can be viewed as a major transition subject for students as they move into the workplace. The study shows that this subject has evolved to act as an…

  3. Final Report on the Evaluation of Project Upswing's First Year.

    ERIC Educational Resources Information Center

    Plantec, P.; And Others

    This technical report describes the evaluation of the first year of Project Upswing, a 2-year experimental study to determine the potential contribution of volunteers in helping young children overcome learning difficulties. The three large groups of first grade children involved received tutoring either from specially trained volunteers,…

  4. Hospitality Occupational Skills Training Cooperative. Project HOST Final Report.

    ERIC Educational Resources Information Center

    Northwest Educational Cooperative, Des Plaines, IL.

    Project HOST (Hospitality Occupational Skills Training) provided vocational training and employment opportunities in the hotel industry to disadvantaged adult minority populations in Chicago. It demonstrated a model for successful cooperation between the business sector and a public vocational education agency and developed and piloted a…

  5. Understanding Equilibrium: The Study of Complex Systems. Final Project Report.

    ERIC Educational Resources Information Center

    Duckworth, Eleanor; And Others

    The Educational Technology Center (ETC) Complex Systems Project was initiated to explore ways of using computers to help students understand systems which have often proven too complex for most high school students to understand. Preliminary work concentrated on the cognitive processes involved in modeling simple systems. This paper describes an…

  6. Skills Conversion Project: Chapter 7, Power Resources. Final Report.

    ERIC Educational Resources Information Center

    National Society of Professional Engineers, Washington, DC.

    The opportunity for employment of displaced aerospace and defense professionals within the electric power utility industry was investigated by the Seattle Skills Conversion Project Team of the National Society of Professional Engineers, as part of a study conducted for the U.S. Department of Labor. The study concluded that a possibility for…

  7. Skills Conversion Project, Chapter 8, Pollution Control. Final Report.

    ERIC Educational Resources Information Center

    National Society of Professional Engineers, Washington, DC.

    The Skills Conversion Project conducted by the National Society of Professional Engineers sought to study the transition mechanisms required to transfer available technical manpower from aerospace and defense industries into other areas of employment in private industry and public service. Fourteen study teams assessed the likelihood of future…

  8. Adult Education School-to-Work Project. Final Report.

    ERIC Educational Resources Information Center

    Gacka, Richard C.

    A project undertaken to determine the feasibility of integrating components of secondary-level tech prep and school-to-work programs into adult basic and literacy education (ABLE) programs. Applied academics curriculum materials developed by the Center for Occupational Research and Development (CORD) and the Agency for Instructional Technology…

  9. Industrial Arts Leadership Development Project, 1977-78. Final Report.

    ERIC Educational Resources Information Center

    Montclair State Coll., Upper Montclair, NJ.

    The Industrial Arts Leadership Development Project was conducted to (1) provide inservice training for teachers to improve the quality of instruction and supervision; (2) provide inservice training for minorities and persons with limited English capability; and (3) provide leadership development for inservice teachers, service staff, and…

  10. DPI Equity Leadership Project--Phase III. Final Report.

    ERIC Educational Resources Information Center

    Riley, Linda L.

    During its third phase in 1993-94, the Wisconsin Department of Public Instruction (DPI) Gender Equity Leadership Project provided technical assistance and staff development experiences to the Wisconsin Vocational Equity Leadership Cadre (WVELC). The technical assistance/staff development component prepared the cadre to assist local districts in…

  11. Victorias energy efficiency and cogeneration project. Final report

    SciTech Connect

    1998-10-31

    This report describes a two-phase energy project currently contemplated for joint implementation at the Victorias Milling Company, a large sugar mill and refinery on the island of Negros in the Visayas region of the Philippines. The Energy Efficiency (EE) phase is expected to reduce of eliminate VMC`s fossil fuel consumption, which will have a direct and substantial impact on carbon emissions. Phase I is an EE project which involves the installation of equipment to reduce steam and electricity demand in the factories. Phase II, will involve retrofitting and increasing the capacity of the steam and power generation systems, and selling power to the grid. By increasing efficiency and output, the cogeneration project will allow the factory to use only bagasse sugar cane fiber waste as fuel for energy needs. The cogeneration project will also eliminate VMC`s electricity purchases and supply additional power for the island, which will offset generation capacity expansion on the island and the Visayas region.

  12. [Wisconsin] Research and Development Project in Career Education: Final Report.

    ERIC Educational Resources Information Center

    Lehrmann, Eugene I.

    The K-Adult research and development project in career education in Eau Claire, Wisconsin, contained two phases: (1) Eau Claire Joint School District Five, introducing the 16 Wisconsin career development concepts into school curricula through teacher workshops, resource materials, public relations, and consulting services for classroom teachers…

  13. FIPSE Interactive Physics Project (October 1989-August 1993). Final Report.

    ERIC Educational Resources Information Center

    Laws, Priscilla W.; Thornton, Ronald K.

    This project focused on encouraging instructors at large universities to take advantage of the curricular materials and computer tools developed for two related programs funded originally by FIPSE. In particular, it involved reworking and integrating materials developed for the previously funded Workshop Physics and Tools for Scientific Thinking…

  14. Facilitating joint implementation and clean energy projects. Final technical report

    SciTech Connect

    1998-09-18

    The prime objectives of this multiple grant agreement between the United States Department of Energy`s Golden Field Office (DOE/GFO) and the United States Export Council for Renewable Energy (US/ECRE) were to: (1) inform investors of potential Joint Implementation projects; (2) identify clean energy projects and US renewable energy and energy efficiency companies; (3) report on the development of the renewable energy marketplace in Latin America and the Caribbean over the life of the REIA initiative; (4) conduct a survey and develop a recommended plan for streamlining and integrating CORECT activities; and (5) convene a meeting of representatives from the renewable energy industry, US electric utilities, power producers, project developers, other nonutility generators, and users of renewable energy resources to catalyze cooperative projects that support the development of renewable energy opportunities in emerging markets. All of these objectives were achieved by US/ECRE with some help from US/ECRE`s consortium of renewable energy industry trade associations.

  15. Project on Research in Student Learning. Final Report.

    ERIC Educational Resources Information Center

    Winkler, Donald R.

    This project researched three questions related to the production of cognitive skills in formal elementary and secondary education. The first question dealt with the pattern of student learning over time. It was found that, generally, the elasticity of grade eight knowledge with respect to grade eight school inputs is higher than the elasticity of…

  16. Urban Options Solar Greenhouse Demonstration Project. Final report

    SciTech Connect

    Cipparone, L.

    1980-10-15

    The following are included: the design process, construction, thermal performance, horticulture, educational activities, and future plans. Included in appendices are: greenhouse blueprints, insulating curtain details, workshop schedules, sample data forms, summary of performance calculations on the Urban Options Solar Greenhouse, data on vegetable production, publications, news articles on th Solar Greenhouse Project, and the financial statement. (MHR)

  17. Final Report on the Structural Strategy Diagnostic Profile Project.

    ERIC Educational Resources Information Center

    Reigeluth, Charles M.; And Others

    The Structural Strategy Diagnostic Profile Project developed the elaboration model of instruction as a superior alternative to standard instructional sequencing based on hierarchical task analysis. The theory construction phase, the first of two phases, identified the instructional variables, postulated cause-effect relationships, and proposed…

  18. Phase II: Final Report. Northern New Mexico Energy Education Project.

    ERIC Educational Resources Information Center

    New Mexico Highlands Univ., Las Vegas.

    Objectives of the Northern New Mexico Energy Education Project were to: (1) improve teachers' knowledge of energy-related subject matter and energy-related educational materials; (2) develop continuing communication and cooperation between elementary and junior high staffs and the university on energy-related matters; and (3) provide follow-up…

  19. Understanding Equilibrium: The Study of Complex Systems. Final Project Report.

    ERIC Educational Resources Information Center

    Duckworth, Eleanor; And Others

    The Educational Technology Center (ETC) Complex Systems Project was initiated to explore ways of using computers to help students understand systems which have often proven too complex for most high school students to understand. Preliminary work concentrated on the cognitive processes involved in modeling simple systems. This paper describes an…

  20. Final Technical Report for Terabit-scale hybrid networking project.

    SciTech Connect

    Veeraraghavan, Malathi

    2015-12-12

    This report describes our accomplishments and activities for the project titled Terabit-Scale Hybrid Networking. The key accomplishment is that we developed, tested and deployed an Alpha Flow Characterization System (AFCS) in ESnet. It is being run in production mode since Sept. 2015. Also, a new QoS class was added to ESnet5 to support alpha flows.

  1. Project Upper Cumberland, Title III ESEA. Final Report.

    ERIC Educational Resources Information Center

    Khanna, J. L.; And Others

    Project Upper Cumberland--serving 16 Tennessee counties from July 1, 1967 through September 30, 1970--sponsored a teachers' inservice program emphasizing human relations training, a cultural arts program (grades 1-12), and a guidance and counseling program (grades 1-9). All 3 programs had the general goal of changing and improving attitudes and…

  2. Managerial Skills in Vocational Education Curriculum Development Project. Final Report.

    ERIC Educational Resources Information Center

    Clayton, Dean; Park, Ok

    A project was conducted to develop, field test, and disseminate a curriculum guide for vocational education teachers to use in teaching managerial skills to vocational education students on the secondary level. After a cadre of 20 Arkansas secondary vocational education teachers who were either directly involved or interested in establishing a…

  3. Project EXCEL: Hotel Workers Literacy Enhancement Program. Final Performance Report.

    ERIC Educational Resources Information Center

    Career Resources Development Center, Inc., San Francisco, CA.

    Project EXCEL is a federally-funded workplace literacy program involving hotel enterprises in the San Francisco (California) Bay area. Its focus is on identification and instruction of literacy skills essential to job success for limited-English-proficient (LEP) workers. Training is intended to enable employees to understand written work orders,…

  4. Collaborative Project on Serving Linguistically Diverse Seniors. Final Report.

    ERIC Educational Resources Information Center

    Burt, Miriam

    In 2002, the Center for Applied Linguistics (CAL) collaborated with the Senior Service Association (SSA) and the American Society on Aging (ASA) on a two-phase project to improve the effectiveness of ASA's sub-grantees in serving linguistically and culturally diverse populations. SSA provides subsidized employment for low-income seniors and funds…

  5. Phase II: Final Report. Northern New Mexico Energy Education Project.

    ERIC Educational Resources Information Center

    New Mexico Highlands Univ., Las Vegas.

    Objectives of the Northern New Mexico Energy Education Project were to: (1) improve teachers' knowledge of energy-related subject matter and energy-related educational materials; (2) develop continuing communication and cooperation between elementary and junior high staffs and the university on energy-related matters; and (3) provide follow-up…

  6. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    SciTech Connect

    GREAGER, T.M.

    1999-12-14

    The Transuranic Waste Characterization Quality Assurance Program Plan required each U.S. Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the quality assurance project plan (QAPP).

  7. Skills Conversion Project, Chapter 8, Pollution Control. Final Report.

    ERIC Educational Resources Information Center

    National Society of Professional Engineers, Washington, DC.

    The Skills Conversion Project conducted by the National Society of Professional Engineers sought to study the transition mechanisms required to transfer available technical manpower from aerospace and defense industries into other areas of employment in private industry and public service. Fourteen study teams assessed the likelihood of future…

  8. Projecting Labor Requirements for Transportation-Related Construction. Final Report.

    ERIC Educational Resources Information Center

    Washington Technical Inst., Washington, DC. Center for Urban Services.

    This report examines the urban transportation planning process and its labor market impact, including projections of opportunities for minority participation in construction, operation, and maintenance of a transportation system and forecasts of training needed in critical occupations. It was found that transportation-related construction may be…

  9. Driver Aid and Education Test Project. Final Report.

    ERIC Educational Resources Information Center

    Shadis, W.; Soucek, S. J.

    A driver education project tested the hypothesis that measurable improvements in fleet fuel economy can be achieved by driver awareness training in fuel-efficient driving techniques and by a manifold vacuum gauge, used individually or in combination with each other. From April 1976 through December 1977 data were collected in the Las Vegas,…

  10. The Future of Work. Curriculum Development Project. Final Report.

    ERIC Educational Resources Information Center

    Center for New Work of Flint, MI.

    The Future of Work project grew out of an essay of the same title by Frithjof Bergmann, a philosophy professor at the University of Michigan. In spring 1983, Professor Bergmann and a colleague, Richard Gull, founded the Center for New Work of Flint in Michigan, where the problems besieging the U.S. auto industry were focusing attention on the…

  11. BLOCK TEACHING PROJECT, INTEGRATING HUMANITIES AND SOCIAL SCIENCE, FINAL REPORT.

    ERIC Educational Resources Information Center

    KREISMAN, ARTHUR

    A BLOCK TEACHING PROJECT BRINGING TOGETHER 100 STUDENTS AND 7 FACULTY MEMBERS, COVERING 6 AREAS OF SUBJECT MATTER FOR A TOTAL OF 12 CREDIT HOURS PER QUARTER FOR 3 QUARTERS, WAS SET UP. THE SUBJECT MATTER WAS MADE UP OF HISTORY OF WESTERN CIVILIZATION (3 CREDIT HOURS PER QUARTER), WORLD LITERATURE (3 CREDIT HOURS PER QUARTER), ENGLISH COMPOSITION…

  12. Working Smart: The Los Angeles Workplace Literacy Project. Final Report.

    ERIC Educational Resources Information Center

    Los Angeles Unified School District, CA. Div. of Adult and Occupational Education.

    The Working Smart workplace literacy project was sponsored by a public school district and several profit and nonprofit companies and conducted for the hotel and food industry in the Los Angeles area. Literacy instruction was merged with job requirements of the customer service job classifications. Videodisc courseware was developed, as were…

  13. Project REAL Evaluation: Final Report 1999-2000 School Year.

    ERIC Educational Resources Information Center

    Howley, Craig

    Project REAL (Rural Education Aligned for Learning) aims to improve mathematics and science education in grades 5-8 in five rural Ohio school districts identified as in "academic emergency" or on "academic watch." Program goals are to reform curricula to teach skills and concepts, rather than facts; improve students' math and…

  14. Rural Improvement Project (RIP). [Summary and Final Evaluation Report.

    ERIC Educational Resources Information Center

    Yvon, Bernard R., Comp.

    The aim of the Rural Improvement Project of Maine from Spring, 1969-Fall, 1970 was to improve the quality of rural education through an innovative attempt to utilize specialized, trained personnel (Cooperating Rural Resource Teachers; associate teachers; teacher aides; 3 undergraduate teachers; and an elementary guidance counselor) and to…

  15. Technical Theatre Project. Final Report 1984-85.

    ERIC Educational Resources Information Center

    Meyer, George

    A project was conducted to enhance the vocational training program of approximately 300 students enrolled in carpentry/general building construction, electrical/electronics, and cosmetology courses by introducing them to possible career opportunities available in the technical theater field. The program was conducted through Somerset County and…

  16. Senior Citizens Project. Final Report 1984-85.

    ERIC Educational Resources Information Center

    Somerset County Vocational Technical Schools, Bridgewater, NJ.

    A program was undertaken to provide hands-on training to high school students enrolled in building trades programs. Students would plan and construct dwellings that would eventually be turned over to the local community services agency to be offered as rental units to low- and moderate-income senior citizens. The initial project was a one-story…

  17. Gypsy Field project in reservoir characterization. Final report

    SciTech Connect

    O`Meara, Jr., D. J.

    1997-05-01

    The overall objective of this project is to use the extensive Gypsy Field laboratory and data set as a focus for developing and testing reservoir characterization methods that are targeted at improved recovery of conventional oil. The Gypsy Field laboratory consists of coupled outcrop and subsurface sites which have been characterized to a degree of detail not possible in a production operation. Data from these sites entail geological descriptions, core measurements, well logs, vertical seismic surveys, a 3D seismic survey, crosswell seismic surveys, and pressure transient well tests. The overall project consists of four interdisciplinary sub-projects which are closely interlinked: modeling depositional environments; sweep efficiency; tracer testing; and integrated 3D seismic interpretation. The first of these aims at improving the ability to model complex depositional environments which trap movable oil. The second is a development geophysics project which proposes to improve the quality of reservoir geological models through better use of 3D seismic data. The third investigates the usefulness of a new numerical technique for identifying unswept oil through rapid calculation of sweep efficiency in large reservoir models. The fourth explores what can be learned from tracer tests in complex depositional environments, particularly those which are fluvial dominated.

  18. An International Comparison of Final-Year Design Project Curricula

    ERIC Educational Resources Information Center

    Kentish, Sandra E.; Shallcross, David C.

    2006-01-01

    This paper reviews design teaching at a total of 15 chemical engineering departments across Australia, Singapore, and the United Kingdom. The emphasis is on the capstone Design Project, which can be viewed as a major transition subject for students as they move into the workplace. The study shows that this subject has evolved to act as an…

  19. The Chicago JOBS Labor Mobility Project. Final Report.

    ERIC Educational Resources Information Center

    Helfer, Charles

    The purpose of the project was to relocate young, poor, unemployed Negroes from the inner core of Chicago to outlying suburban communities in order to provide greater upward mobility. Most were to have completed a JOBS (Job Opportunities Through Better Skills) program of prevocational counseling and skill training. (Author)

  20. The Maryland Career Development Project--Phase I. Final Report.

    ERIC Educational Resources Information Center

    Mietus, Walter S.; Stilling, Chris

    This first phase of an exemplary career development project in Maryland included the following seven action programs, each with general and specific goals and objectives: (1) a team approach at selected junior high schools involving counselors, home economics, and industrial arts teachers, (2) use of a full-time resource consultant in five…

  1. The Future of Work. Curriculum Development Project. Final Report.

    ERIC Educational Resources Information Center

    Center for New Work of Flint, MI.

    The Future of Work project grew out of an essay of the same title by Frithjof Bergmann, a philosophy professor at the University of Michigan. In spring 1983, Professor Bergmann and a colleague, Richard Gull, founded the Center for New Work of Flint in Michigan, where the problems besieging the U.S. auto industry were focusing attention on the…

  2. South Umpqua School District #19 Experimental Schools Project. Final Report.

    ERIC Educational Resources Information Center

    South Umpqua School District, Myrtle Creek, OR.

    This document reports on a federally funded Experimental Schools project that took place over a five-year period, 1972-77, in a small, rural Oregon district. The report is primarily a narrative on change and change agentry as viewed from the perspective of school personnel. After background discussion and brief descriptions of the program,…

  3. Final Report of the Vocational Assessment Project, 1979-80.

    ERIC Educational Resources Information Center

    Rutgers, The State Univ., New Brunswick, NJ. School of Medicine.

    To improve vocational rehabilitation programs for schizophrenic persons, a project sought to design an effective assessment strategy. Inactive records of schizophrenic clients at New Jersey sheltered workshops were examined to determine validity and reliability of assessment instruments being used. General Aptitude Test Battery (GATB) profiles of…

  4. Research Project Concerning Students From Minority Groups. Final Report.

    ERIC Educational Resources Information Center

    McArthur, John H.

    The motivation of this project was a desire on the part of the Harvard Business School to augment equality of career opportunities in management for minority group members and to insure expanded managerial training so that new capabilities would be developed to match new opportunities. This document describes programs undertaken by the faculty and…

  5. Project ESL/Careers Curriculum. Final Report 1983-1984.

    ERIC Educational Resources Information Center

    Atlantic Community Coll., Mays Landing, NJ.

    This curriculum guide was developed at Atlantic Community College as part of a program to facilitate the training of persons with limited English-speaking ability for jobs, especially jobs in Atlantic City casinos. The project aimed to teach job skills and life coping skills along with English. The curriculum guide contains 10 units. Approximately…

  6. Final report of Project 617, the Energy Saver

    SciTech Connect

    1996-12-31

    The Project work was begun in January of 1995 and was completed in May of 1996. The authors performed a broad value engineering study to examine all parts and functions to lower costs, improve functioning and safety. The results of the Phase 1 work was a total redesign of the original Energy Saver resulting in two components instead of three, a weight of four pounds versus the original fourteen pounds and a reduction from 21 pieces to 10 pieces. The manufactured cost dropped from $350 to $175. Based on these improvements the Value Improvement Project has been successful. The second generation unit was named the BROIL-MASTER and has been registered under the Provisional Application (Patent) Program. The authors performed a technical analysis to determine the potential energy savings of applications identified and collect data on host product gas consumption, payback period, and other cost/saving relationships. The industrial search for energy project applications for the authors design was not successful. Seven Broil-Master demonstration projects have been successfully completed. The Broil-Master has received certification from the American Gas Association and UL approval is due by the end of July. The Restaurant Equipment Test Center of Pacific Gas and Electric is interested in testing the Broil-Master sometime in 1996. The Broil-Master was shown at an International Restaurant Equipment Show in September, 1995 and the National Restaurant Show in May, 1996. The authors now have under way four tests with chains and several other tests pending.

  7. Project VITAL. Final Financial Status and Performance Report.

    ERIC Educational Resources Information Center

    Ellison, Arthur

    In its third year of funding, Project VITAL (Volunteers In Training Act and Learn) was designed to provide literacy training to 500 librarians, coordinators, and volunteers working in literacy programs. Through the techniques of improvisational theater, structured scenarios were enacted dealing with illiteracy, women's concerns of domestic…

  8. Final Report of the Vocational Assessment Project, 1979-80.

    ERIC Educational Resources Information Center

    Rutgers, The State Univ., New Brunswick, NJ. School of Medicine.

    To improve vocational rehabilitation programs for schizophrenic persons, a project sought to design an effective assessment strategy. Inactive records of schizophrenic clients at New Jersey sheltered workshops were examined to determine validity and reliability of assessment instruments being used. General Aptitude Test Battery (GATB) profiles of…

  9. Project ES '70 Training for Local Coordinators. Final Report.

    ERIC Educational Resources Information Center

    Jacobson, Majory E.

    The "organic curriculum" of the Educational System of the Seventies Project (ES '70) is one which integrates academic training, occupational training, and personal development in grades nine through 12 and which draws heavily on research dealing with individualized instruction. The program held at Kingsley Inn, Bloomfield Hills,…

  10. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    SciTech Connect

    Not Available

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  11. Parent Services Project Evaluation: Final Report of Findings.

    ERIC Educational Resources Information Center

    Stein, Alan R.; Haggard, Molly

    The Parent Services Project (PSP) is a family resource program which provides supportive activities for highly stressed and socially isolated parents based on the "social support as a stress-buffer" model of primary prevention. A PSP evaluation followed parents as they went through the PSP program and compared them with a matched control…

  12. Project 88: A New Technical Nursing Curriculum. Final Report.

    ERIC Educational Resources Information Center

    Jorenby, Barbara; And Others

    A project was conducted in Minnesota: (1) to describe and document a new level of technical nursing appropriate for 1988 for people educated at less than baccalaureate level; (2) to identify exit competencies of graduates of new programs; and (3) to develop model curricula for new programs in Minnesota's adult vocational technical institutes,…

  13. Common Ada (tradename) Missile Package (CAMP) Project. Missile Software Parts. Volume 2. Version Description Document

    DTIC Science & Technology

    1988-03-01

    DirectlonCosineMatrixOperations TLCSCs which provide the basic functionality of a navigation subsystem Kaiman Filter Kalman_Filter_Coinmon_Part» TLCSC...Wander_Aziniuth_NavigBtion_ParU 003 North_Pointing_Navlgatloti_Parts 644 Direct ion_Cosfne_Matrlx_Operations Kaiman filter packages: 651 Kalman_Fllier_Coimnon_Par« 652...for the CAMP Kaiman filter parts; Coded Name Development Name Kalinan_Filier_Common_Parts (P6S t) s651000.ada 651 _000_kalman_cominon_. ada

  14. The Final Examination Survey Project: A Report of the Results.

    ERIC Educational Resources Information Center

    Haid, William R.; Johnson, G. Frost

    1989-01-01

    A national survey of policies and procedures concerning college final examination scheduling found most have a formal schedule, most do not use an automated scheduling system or any priority when assigning examinations, more than half use "special" examination scheduling, and registrars or assistant registrars are most commonly…

  15. Missouri Soybean Association Biodiesel Demonstration Project: Final Report

    SciTech Connect

    Ludwig, Dale; Hamilton, Jill

    2011-10-27

    The Missouri Soybean Association (MSA) and the National Biodiesel Board (NBB) partnered together to implement the MSA Biodiesel Demonstration project under a United States Department of Energy (DOE) grant. The goal of this project was to provide decision makers and fleet managers with information that could lead to the increased use of domestically produced renewable fuels and could reduce the harmful impacts of school bus diesel exhaust on children. This project was initiated in September 2004 and completed in April 2011. The project carried out a broad range of activities organized under four areas: 1. Petroleum and related industry education program for fuel suppliers; 2. Fleet evaluation program using B20 with a Missouri school district; 3. Outreach and awareness campaign for school district fleet managers; and 4. Support of ongoing B20 Fleet Evaluation Team (FET) data collection efforts with existing school districts. Technical support to the biodiesel industry was also provided through NBB’s Troubleshooting Hotline. The hotline program was established in 2008 to troubleshoot fuel quality issues and help facilitate smooth implementation of the RFS and is described in greater detail under Milestone A.1 - Promote Instruction and Guidance on Best Practices. As a result of this project’s efforts, MSA and NBB were able to successfully reach out to and support a broad spectrum of biodiesel users in Missouri and New England. The MSA Biodiesel Demonstration was funded through a FY2004 Renewable Energy Resources Congressional earmark. The initial focus of this project was to test and evaluate biodiesel blends coupled with diesel oxidation catalysts as an emissions reduction technology for school bus fleets in the United States. The project was designed to verify emissions reductions using Environmental Protection Agency (EPA) protocols, then document – with school bus fleet experience – the viability of utilizing B20 blends. The fleet experience was expected to

  16. Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

    SciTech Connect

    Taddeucci, Joe

    2013-03-29

    The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a

  17. Progress and challenges in modelling country-level HIV/AIDS epidemics: the UNAIDS Estimation and Projection Package 2007.

    PubMed

    Brown, T; Salomon, J A; Alkema, L; Raftery, A E; Gouws, E

    2008-08-01

    The UNAIDS Estimation and Projection Package (EPP) was developed to aid in country-level estimation and short-term projection of HIV/AIDS epidemics. This paper describes advances reflected in the most recent update of this tool (EPP 2007), and identifies key issues that remain to be addressed in future versions. The major change to EPP 2007 is the addition of uncertainty estimation for generalised epidemics using the technique of Bayesian melding, but many additional changes have been made to improve the user interface and efficiency of the package. This paper describes the interface for uncertainty analysis, changes to the user interface for calibration procedures and other user interface changes to improve EPP's utility in different settings. While formal uncertainty assessment remains an unresolved challenge in low-level and concentrated epidemics, the Bayesian melding approach has been applied to provide analysts in these settings with a visual depiction of the range of models that may be consistent with their data. In fitting the model to countries with longer-running epidemics in sub-Saharan Africa, a number of limitations have been identified in the current model with respect to accommodating behaviour change and accurately replicating certain observed epidemic patterns. This paper discusses these issues along with their implications for future changes to EPP and to the underlying UNAIDS Reference Group model.

  18. THz transceiver characterization : LDRD project 139363 final report.

    SciTech Connect

    Nordquist, Christopher Daniel; Wanke, Michael Clement; Cich, Michael Joseph; Reno, John Louis; Fuller, Charles T.; Wendt, Joel Robert; Lee, Mark; Grine, Albert D.

    2009-09-01

    LDRD Project 139363 supported experiments to quantify the performance characteristics of monolithically integrated Schottky diode + quantum cascade laser (QCL) heterodyne mixers at terahertz (THz) frequencies. These integrated mixers are the first all-semiconductor THz devices to successfully incorporate a rectifying diode directly into the optical waveguide of a QCL, obviating the conventional optical coupling between a THz local oscillator and rectifier in a heterodyne mixer system. This integrated mixer was shown to function as a true heterodyne receiver of an externally received THz signal, a breakthrough which may lead to more widespread acceptance of this new THz technology paradigm. In addition, questions about QCL mode shifting in response to temperature, bias, and external feedback, and to what extent internal frequency locking can improve stability have been answered under this project.

  19. The Andromeda Project: Final Results of Citizen Science Cluster Identification

    NASA Astrophysics Data System (ADS)

    Seth, Anil; Johnson, L. C.; Wallace, M.; Dalcanton, J.; Kapadia, A.; Lintott, C.; Simpson, R.; Skillman, E. D.; PHAT Team; Andromeda Project Team

    2014-01-01

    The Panchromatic Hubble Andromeda Treasury (PHAT) survey has completed data collection, having taken over 30 billion pixels of imaging data of the Andromeda galaxy over four years using the Hubble Space Telescope. These data contain the largest sample of star clusters observable in any galaxy, including our own Milky Way. The Andromeda Project is a citizen science project that recruited over 10,000 volunteers to identify thousands of star clusters in the PHAT imaging. We present results culminating from two rounds of cluster searching and the properties of the resulting sample. We discuss catalog completeness results derived from synthetic cluster data. This cluster sample represents a significant advance in our ability to study star and cluster formation on galaxy wide scales. We are using the resulting cluster sample to provide the best available constraints on the high-mass initial mass function and the fraction of star formation that results in bound star clusters.

  20. Final project report: High energy rotor development, test and evaluation

    SciTech Connect

    1996-09-01

    Under the auspices of the {open_quotes}Government/Industry Wind Technology Applications Project{close_quotes} [{open_quotes}Letter of Interest{close_quotes} (LOI) Number RC-1-11101], Flo Wind Corp. has successfully developed, tested, and delivered a high-energy rotor upgrade candidate for their 19-meter Vertical Axis Wind Turbine. The project included the demonstration of the innovative extended height-to-diameter ratio concept, the development of a continuous span single-piece composite blade, the demonstration of a continuous blade manufacturing technique, the utilization of the Sandia National Laboratories developed SNLA 2150 natural laminar flow airfoil and the reuse of existing wind turbine and wind power plant infrastructure.