Science.gov

Sample records for package project final

  1. Evaluation of the Field Test of Project Information Packages: Volume I--Viability of Packaging. Final Report.

    ERIC Educational Resources Information Center

    Stearns, Marian S.

    The United States Office of Education (USOE) in 1973 commissioned the creation of Project Information Packages (PIPs) that could fulfill USOE's aims for a cost-effective mechanism for disseminating exemplary programs beyond their developers to school districts with less successful compensatory educational projects. Three volumes report the first…

  2. Summary strategy for compliance with postclosure requirements for the waste package for the Salt Repository Project: Final report

    SciTech Connect

    Not Available

    1988-03-01

    This document presents a summary of the strategy of the Salt Repository Project (SRP) to show compliance with the requirements for the waste package after permanent closure of the repository at the site in Deaf Smith County, Texas. The postclosure requirements that govern the performance of the waste package are those in 10 CFR 60.113 for substantially complete containment of the waste and for gradual release of radionuclides after the containment period, and for the postclosure design requirements in 10 CFR 60.135. Also, the waste package plays a role in showing compliance with the total system release requirement in 40 CFR 191.13. 12 refs.

  3. Introduction to Software Packages. [Final Report.

    ERIC Educational Resources Information Center

    Frankel, Sheila, Ed.; And Others

    This document provides an introduction to applications computer software packages that support functional managers in government and encourages the use of such packages as an alternative to in-house development. A review of current application areas includes budget/project management, financial management/accounting, payroll, personnel,…

  4. Hermetic packaging for microwave modules. Final report

    SciTech Connect

    Hollar, D.L.

    1996-10-01

    Microwave assemblies, such as radar modules, require hermetically sealed packaging. Since most of these assemblies are used for airborne applications, the packages must be lightweight. The aluminum alloy A-40 provides the needed characteristics of these applications. This project developed packaging techniques using the A-40 alloy as a housing material and laser welding processes to install connectors, purge tube, and covers on the housings. The completed package successfully passed the hermetic leak requirements and environmental testing. Optimum laser welding parameters were established in addition to all of the related tooling for assembly.

  5. Final Report Package_Winnebago

    SciTech Connect

    Carolyn Stewart, Director, Red Mountain Energy Partners

    2006-10-31

    The Winnebago Tribe of Nebraska energy options study results will be used to advance the Tribe’s near term energy management objectives. The array of energy options identified allows the Tribe to select those activities that best fit its energy strategies, goals and objectives. During the course of the study, Red Mountain analyzed both energy options and energy organizational alternatives suitable for the Tribe, presented findings to the Tribal Council, and made recommendations regarding each. Work products delivered to the Tribe, and provided in the Final Report included: • A matrix of energy management options applicable to the Tribe, which provided descriptions of particular conservation, efficiency, weatherization, and demand management alternatives. The matrix also provided insight about relative costs of the alternatives, cost/benefit efficacy, ease of implementation, resources for implementing, and observations about each. • A matrix of utility service options applicable to the Tribe, describing each of the four alternatives described above. The matrix also provided insight about key benefits of each option, required resources, costs and timeframe for implementation, funding sources and analysis, and key issues for consideration. • Discussion guides prepared for each meeting between the Energy Committee and Council, and the Tribe’s contractor, Red Mountain Energy Partners, which included preliminary analysis and findings. • A Position Description for the Energy Manager position, which was reviewed by the Tribal HR Department, and used by the Tribe to develop a position posting. • A Utility Code designed for Winnebago to use in establishing its Utility Board, and, ultimately, to provide guidance for the Board’s further development. • A project summary book developed to include all key information, deliverables and utility provider data for the project. Winnebago’s growth trends and expansion plans require the Tribe to play a more active

  6. Waste package/repository impact study: Final report

    SciTech Connect

    Not Available

    1985-09-01

    The Waste Package/Repository Impact Study was conducted to evaluate the feasibility of using the current reference salt waste package in the salt repository conceptual design. All elements of the repository that may impact waste package parameters, i.e., (size, weight, heat load) were evaluated. The repository elements considered included waste hoist feasibility, transporter and emplacement machine feasibility, subsurface entry dimensions, feasibility of emplacement configuration, and temperature limits. The evaluations are discussed in detail with supplemental technical data included in Appendices to this report, as appropriate. Results and conclusions of the evaluations are discussed in light of the acceptability of the current reference waste package as the basis for salt conceptual design. Finally, recommendations are made relative to the salt project position on the application of the reference waste package as a basis for future design activities. 31 refs., 11 figs., 11 tabs.

  7. The Development of Project Information Packages for Effective Approaches in Compensatory Education. Final Report. Report No. UR-254.

    ERIC Educational Resources Information Center

    Tallmadge, G. Kasten

    The project described herein represents an attempt by the U. S. Office of Education to take a more active role in the national dissemination and replication of those programs which have achieved the greatest success in producing reliably measured achievement benefits in reading and mathematical skills. With this general objective in mind, the U.…

  8. Cross flow filter for AEPSC: TIDD slipstream HGCU project preliminary design package for Westinghouse cross flow filter system. Final submittal

    SciTech Connect

    Haldipur, G.B.; Lippert, T.E.

    1989-06-16

    The Westinghouse ceramic cross-flow filter element is constructed of multiple layers of thin, porous ceramic plates that contain ribs to form gas flow channels. Consecutive layers of the ceramic plates are oriented such that the channels of alternating plates are at an angle of 90 degrees (``cross flow``) to each other. The current size of a ceramic cross flow filter element is 12 in. {times} 12 in. {times} 14 in. Both sides of the short channels (4 in.) are exposed to the particle-laden coal gas. One end of the long (12 in.) channels is sealed while the other end of the long channel is mounted to the clean gas plenum. The particle-laden coal gas flows through the ``roof and floor`` of the porous ceramic plates that comprise the short, ``dirty side`` channels. The gas flows through the porous plates to the long, ``clean side`` channels. The gas flows through the porous plates to the long, ``clean side`` channels and finally to the clean gas plenum. The dust cake on the ``dirty side`` channels is periodically removed by applying a high-pressure reverse pulse of dry, clean gas through the clean gas plenum. For the TIDD plant filter slipstream, air will be utilized for filter cleaning.

  9. [The Waste Package Project. Final report, July 1, 1995--February 27, 1996]: Volume 3, Stress study in faulted tunnel models by combined photoelastic measurements and finite element analysis

    SciTech Connect

    Ladkany, S.G.; Huang, Yuping

    1996-06-01

    The aim of this part of the Nuclear Waste Package Project research at UNLV is to investigate the stresses in a model of a faulted mountain and the effect of the fault on the stability of drifts in a proposed High Level Nuclear Waste Repository. An investigation was performed to develop a proper technique for analyzing the stresses in and around three adjacent scaled tunnel models, along with the stress concentration factors resulting from the existence of a fault that penetrates two of the three tunnels, at an inclined angel of 44{degrees} to the horizontal plane. The results and experience gained from this investigation will be used in a future project in which a full-size repository drift and a penetrating fault will be modeled and analyzed.

  10. Prometheus Project final report

    NASA Technical Reports Server (NTRS)

    Taylor, Randall

    2005-01-01

    This Final Report serves as an executive summary of the Prometheus Project's activities and deliverables from November 2002 through September 2005. It focuses on the challenges from a technical and management perspective, what was different and innovative about this project, and identifies the major options, decisions, and accomplishments of the Project team as a whole. However, the details of the activities performed by DOE NR and its contractors will be documented separately in accordance with closeout requirements of the DOE NR and consistent with agreements between NASA and NR.

  11. Project CHILD: Final Report.

    ERIC Educational Resources Information Center

    Texas Education Agency, Austin.

    Presented is the final report of Project CHILD, a research effort to develop and validate screening procedures for the identification of language disabled (LD) children, three intervention models for LD children, and a competency based teacher education model. In the two phases of the first study, a battery of screening tests was evaluated with a…

  12. A Learning Package in Energy Conservation for Participants in the Home Building Industry. Final Report.

    ERIC Educational Resources Information Center

    Houston Univ., TX. College of Architecture.

    Presented is the final report for a project designed to develop an experimental learning package for educating participants in the home building industry in energy conservation. The project addresses deficiencies in the present knowledge status of members of the home building industry, effective marketing techniques for energy conserving homes,…

  13. PLUTONIUM FINISHING PLANT (PFP) STABILIZATION & PACKAGING PROJECT

    SciTech Connect

    GERBER, M.S.

    2004-01-14

    Fluor Hanford is pleased to submit the Plutonium Finishing Plant (PFP) Stabilization and Packaging Project (SPP) for consideration by the Project Management Institute as Project of the Year for 2004. The SPP thermally stabilized and/or packaged nearly 18 metric tons (MT) of plutonium and plutonium-bearing materials left in PFP facilities from 40 years of nuclear weapons production and experimentation. The stabilization of the plutonium-bearing materials substantially reduced the radiological risk to the environment and security concerns regarding the potential for terrorists to acquire the non-stabilized plutonium products for nefarious purposes. The work was done In older facilities which were never designed for the long-term storage of plutonium, and required working with materials that were extremely radioactive, hazardous, pyrophoric, and In some cases completely unique. I n some Instances, one-of-a-kind processes and equipment were designed, installed, and started up. The SPP was completed ahead of schedule, substantially beating all Interim progress milestone dates set by the Defense Nuclear Facilities Safety Board (DNFSB) and in the Hanford Site's Federal Facility Agreement and Consent Order (Tri-Party Agreement or TPA), and finished $1-million under budget.

  14. [The Waste Package Project. Final report, July 1, 1995--February 27, 1996]: Volume 2, Experimental verification of structural response of a flexible three-link hydraulic steel robot

    SciTech Connect

    Ladkany, S.G.; Channarayapatna, S.S.

    1996-06-01

    This report presents experimental techniques for determining the static and dynamic response, in three dimensional space, of a flexible three-link hydraulic steel robot. The flexible robot was originally built under a grant from the Army Research Office (ARO) and has been the subject of a six year research project involving 12 graduate students and four faculty members. The research was continued under grant from the U.S. Department of Energy which is considering the use of robot in remote handling, placement and retrievability of H.L.N.W. canisters in geological formations. A series of static and dynamic experiments was conducted under two different loads at various angular positions of the robot links.

  15. Project ACHIEVE final report

    SciTech Connect

    1997-06-13

    Project ACHIEVE was a math/science academic enhancement program aimed at first year high school Hispanic American students. Four high schools -- two in El Paso, Texas and two in Bakersfield, California -- participated in this Department of Energy-funded program during the spring and summer of 1996. Over 50 students, many of whom felt they were facing a nightmare future, were given the opportunity to work closely with personal computers and software, sophisticated calculators, and computer-based laboratories -- an experience which their regular academic curriculum did not provide. Math and science projects, exercises, and experiments were completed that emphasized independent and creative applications of scientific and mathematical theories to real world problems. The most important outcome was the exposure Project ACHIEVE provided to students concerning the college and technical-field career possibilities available to them.

  16. Project ACORDE. Final Report.

    ERIC Educational Resources Information Center

    Kelley, Marjorie L.

    A report is presented on the evaluation and redevelopment of an 11-module course of instruction in restorative dentistry conducted under Project Acorde. The major learning goals for students were: acquisition of the necessary skills and knowledge of appropriate tools and materials; and self-appraisal of one's own work in performing the various…

  17. ACCESS Project: Final Report

    SciTech Connect

    Weller, Heiko

    2015-04-01

    The ACCESS project addressed the development, testing, and demonstration of the proposed advanced technologies and the associated emission and fuel economy improvement at an engine dynamometer and on a full-scale vehicle. Improve fuel economy by 25% with minimum performance penalties Achieve SULEV level emissions with gasoline Demonstrate multi-mode combustion engine management system

  18. Project Final Report

    NASA Technical Reports Server (NTRS)

    Ciolkosz, Daniel; Albright, Louis

    1999-01-01

    The initial focus of this GSRP project was to model and develop systems for optimized use of the Microwave lamp for use in bioregenerative life support systems (BLSS). The microwave lamp, which has been developed for use in BLSS as part of a NASA small business innovation research (SBIR) grant, exhibits a number of characteristics that make it an excellent candidate for use in BLSS. However, we decided to shift the focus of the project, after discussions with scientists at KSC, to a broader question. Specifically, we decided to investigate the possibility of developing a decision tool for characterizing overall fighting system effectiveness in a plant growth system. It seemed pointless to optimize a microwave lamp for BLSS when there was no good way to decide what exactly an optimized system would look like. The problem is a complex one, involving multiple, conflicting objectives with irreconcilable units, significant constraints, and a wide range of relative importance among the objectives. The project would involve not only characterizing this complex decision process, but also would require some investigations into the physical properties of the lighting systems being considered. Thus, we turned to the field of Decision Modeling as a means of meeting this objective. After a thorough investigation of the literature, a technique was chosen and carefully developed. Implementation and analysis of the system are still in progress, and should be completed during the summer of 1999. Ancillary studies, which were conducted in the course of the project, have also been conducted, and are summarized below.

  19. Final Year Project Report

    SciTech Connect

    Hubsch, Tristan

    2013-06-20

    In the last years of this eighteen-year grant project, the research efforts have focused mostly on the study of off-shell representations of supersymmetry, both on the worldline and on the world- sheet, i.e., both in supersymmetric quantum mechanics and in supersymmetric field theory in 1+1-dimensional spacetime.

  20. Final Project Report

    SciTech Connect

    Small, R. Justin; Bryan, Frank; Tribbia, Joseph; Park, Sungsu; Dennis, John; Saravanan, R.; Schneider, Niklas; Kwon, Young-Oh

    2015-06-01

    Most climate models are currently run with grid spacings of around 100km, which, with today’s computing power, allows for long (up to 1000 year) simulations, or ensembles of simulations to explore climate change and variability. However this grid spacing does not resolve important components of the weather/climate system such as atmospheric fronts and mesoscale systems, and ocean boundary currents and eddies. The overall aim of this project has been to look at the effect of these small-scale features on the weather/climate system using a suite of high and low resolution climate models, idealized models and observations. This project was only possible due to the highly scalable aspect of the CAM Spectral Element dynamical core, and the significant resources allocated at Yellowstone and NERSC for which we are grateful.

  1. Final Project Report

    SciTech Connect

    Bogucz, E A

    2010-12-13

    This project pursued innovations to improve energy efficiency and indoor environmental quality (IEQ) in commercial and residential buildings. For commercial buildings, the project developed a testbed for “intelligent nested environmental systems technologies (iNEST),” which monitor and control energy flows and IEQ across a cascade of spaces from individuals’ desktops to office suites to floors to whole buildings. An iNEST testbed was constructed at Syracuse University and was used to assess the use of devices such as personal badges and CO2 sensors to study how reduced energy use and improved IEQ could be achieved. For residential buildings, resources were targeted in support of DoE’s Builders Challenge Program and to recruit Syracuse, NY builders. Three homes in Syracuse’s Near Westside neighborhood were also registered under the program by Syracuse University team, with an additional home registered by one of the builders. Findings from the work at the iNEST testbed facility, and results from other related projects were disseminated through Syracuse Center of Excellence in Environmental and Energy Systems (SyracuseCoE) 2008 Annual Symposium, the 9th International Healthy Buildings 2009 Conference & Exhibition, and through SyracuseCoE’s website and eNewsletters to inform the broader community of researchers, designers and builders. These public communication activities helped enhance the understanding of high performance buildings and facilitate further market acceptance.

  2. Final project report

    SciTech Connect

    Nitin S. Baliga and Leroy Hood

    2008-11-12

    The proposed overarching goal for this project was the following: Data integration, simulation and visualization will facilitate metabolic and regulatory network prediction, exploration, and formulation of hypotheses. We stated three specific aims to achieve the overarching goal of this project: (1) Integration of multiple levels of information such as mRNA and protein levels, predicted protein-protein interactions/associations and gene function will enable construction of models describing environmental response and dynamic behavior. (2) Flexible tools for network inference will accelerate our understanding of biological systems. (3) Flexible exploration and queries of model hypotheses will provide focus and reveal novel dependencies. The underlying philosophy of these proposed aims is that an iterative cycle of experiments, experimental design, and verification will lead to a comprehensive and predictive model that will shed light on systems level mechanisms involved in responses elicited by living systems upon sensing a change in their environment. In the previous years report we demonstrated considerable progress in development of data standards, regulatory network inference and data visualization and exploration. We are pleased to report that several manuscripts describing these procedures have been published in top international peer reviewed journals including Genome Biology, PNAS, and Cell. The abstracts of these manuscripts are given and they summarize our accomplishments in this project.

  3. Final project report

    SciTech Connect

    Podzorov, Vitaly

    2012-10-28

    The scope of this project is to investigate fundamental aspects of self-assembled monolayers (SAMs) grown at the surface of organic semiconductors and other electronic materials, recently discovered in our group (Fig. 1) [1]. Understanding the growth mechanism and structure of these SAMs, as well as investigating the effect of SAM-induced high surface conductivity, are the main thrusts of the project. An additional thrust of the project is to find new ways of surface doping or surface gating of novel semiconductors, in which electronic traps at the interface would be passivated. Molecular self assembly is an exciting research area of modern materials science, playing an important role in a variety of emerging applications, such as organic and molecular electronics, bioengineering, sensors and actuators. The current effort in this field has been focused on two experimental platforms: SAMs on metals (e.g., Au) and SAMs on inorganic oxides (e.g., SiO2). We have recently discovered the third platform, molecular self-assembly at the surface of carbon-based electronic materials (organic semiconductors, graphene and CNTs), which opens new opportunities for fundamental research and applications (Fig. 1) [1, 2, 3]. One of the most intriguing aspects of the new discovery is that formation of an FTS self-assembled monolayer on these materials induces a high-density mobile charges, with n up to 1014 cm-2, resulting in a large surface conductivity, σ ≈ 10-5 S·square-1 [1]. The effect is due to an interfacial electron transfer from the semiconductor to the SAM, resulting in a 0.54 V potential drop across the 1.3 nm-thick SAM, as recently revealed by Kelvin probe microscopy in rubrene [4].

  4. The Thy Project. Final Report.

    ERIC Educational Resources Information Center

    Billimoria, Roshan R., Ed.

    Inspiried by a United Nations effort to establish a worldwide university, the four and one-half year project carried out in Thy (Denmark) is explained in this final report, from its historical beginnings in 1973 to its official completion in 1978. Dedicated to the solution of problems which could be considered universal, the project goals are…

  5. The Trine Project Final Report.

    ERIC Educational Resources Information Center

    Gunderson, Jon R.; And Others

    The final report describes the Trine Project which addressed three needs in the education of handicapped children: the need for an alternate writing system, the need for communication, and the need for access to general purpose computers used in the schools. The project had three major objectives: (1) to design a low-cost portable writing and…

  6. Prototypical Consolidation Demonstration Project: Final report

    SciTech Connect

    Gili, J.A.; Poston, V.K.

    1993-11-01

    This is the final report of the Prototypical Consolidation Demonstration Project, which was funded by the US Department of Energy`s Office of Civilian Radioactive Waste Management. The project had two objectives: (a) to develop and demonstrate a prototype of production-scale equipment for the dry, horizontal consolidation and packaging of spent nuclear fuel rods from commercial boiling water reactor and pressurized water reactor fuel assemblies, and (b) to report the development and demonstration results to the US Department of Energy, Idaho Operations Office. This report summarizes the activities and conclusions of the project management contractor, EG&G Idaho, Inc., and the fabrication and testing contractor, NUS Corporation (NUS). The report also presents EG&G Idaho`s assessments of the equipment and procedures developed by NUS.

  7. Final Project Report

    SciTech Connect

    Zhang, Jin; Zhao, Yiping

    2014-12-05

    In this entire project period from 2005-2014, we have made significant progress in developing novel nanostructures of metal oxides (MOs) for solar hydrogen generation based on photoelectrochemical (PEC). Materials investigated are focused on 1D and 0D MO nanostructures of TiO2, WO3, ZnO, and Fe2O3 in conjunction with quantum dot (QD) sensitization and chemical doping (N or H) to alter their electronic band structures for both visible light absorption and for facilitating interfacial charge transport. In addition, we have used plasmonic metal nanostructures to enhance the PEC performance by improving light absorption of QDs via enhanced scattering of the plamonic metal. Most importantly, we have discovered a multipronged strategy for improving PEC performance: using plasmonic metal nanostructure to enhance light absorption, QDs to improve charge transfer, and chemical doping to increase charge transport in metal oxides for PEC. The combination is critical for overall high efficiency of PEC. This strategy is developed and demonstrated for the first time to our best knowledge.

  8. Final system instrumentation design package for Decade 80 solar house

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The final configuration of the Decade 80 solar house to monitor and collect system performance data is presented. A review demonstrated by actual operation that the system and the data acquisition subsystem operated satisfactorily and installation of instrumentation was in accordance with the design. This design package is made up of (1) site and system description, (2) operating and control modes, and (3) instrumentation program (including sensor schematic).

  9. TYPE A FISSILE PACKAGING FOR AIR TRANSPORT PROJECT OVERVIEW

    SciTech Connect

    Eberl, K.; Blanton, P.

    2013-10-11

    This paper presents the project status of the Model 9980, a new Type A fissile packaging for use in air transport. The Savannah River National Laboratory (SRNL) developed this new packaging to be a light weight (<150-lb), drum-style package and prepared a Safety Analysis for Packaging (SARP) for submission to the DOE/EM. The package design incorporates unique features and engineered materials specifically designed to minimize packaging weight and to be in compliance with 10CFR71 requirements. Prototypes were fabricated and tested to evaluate the design when subjected to Normal Conditions of Transport (NCT) and Hypothetical Accident Conditions (HAC). An overview of the design details, results of the regulatory testing, and lessons learned from the prototype fabrication for the 9980 will be presented.

  10. Required warnings for cigarette packages and advertisements. Final rule.

    PubMed

    2011-06-22

    The Food and Drug Administration (FDA) is amending its regulations to add a new requirement for the display of health warnings on cigarette packages and in cigarette advertisements. This rule implements a provision of the Family Smoking Prevention and Tobacco Control Act (Tobacco Control Act) that requires FDA to issue regulations requiring color graphics, depicting the negative health consequences of smoking, to accompany the nine new textual warning statements required under the Tobacco Control Act. The Tobacco Control Act amends the Federal Cigarette Labeling and Advertising Act (FCLAA) to require each cigarette package and advertisement to bear one of nine new textual warning statements. This final rule specifies the color graphic images that must accompany each of the nine new textual warning statements. PMID:21696017

  11. Project Dakota Outreach: Final Report.

    ERIC Educational Resources Information Center

    Kjerland, Linda

    This final report describes the activities of Project Dakota Outreach, an early education program for children with disabilities designed to assist families living in Department of Housing and Urban Development (HUD) Empowerment and Enterprise Zones in Texas, New York, and Minnesota. The major feature of the model is power-balancing, a concept…

  12. Multihandicapped Blind. Final Project Report.

    ERIC Educational Resources Information Center

    Jones, Lloyd

    The final report of the Garden Grove unified school district project for 1969 through 1972 (funded through Title III) involving six multiply handicapped, legally blind children, 7- to 10-years-old, who were previously excluded from special education (SE) classes is presented. Described as the main procedural objective is development of a…

  13. Medicaid program; state flexibility for Medicaid benefit packages. Final rule.

    PubMed

    2010-04-30

    This rule revises the final rule published on December 3, 2008 to implement provisions of section 6044 of the Deficit Reduction Act of 2005, which amends the Social Security Act by adding a new section 1937 related to the coverage of medical assistance under approved State plans. That rule provides States increased flexibility under an approved State plan to define the scope of covered medical assistance by offering coverage of benchmark or benchmark-equivalent benefit packages to certain Medicaid-eligible individuals. In addition, this final rule responds to public comments on the February 22, 2008 proposed rule and comments received in response to rules published subsequently that delayed the effective date of the December 3, 2008 final rule until July 1, 2010.

  14. PRIDE Surveillance Projects Data Packaging Project Information Package Specification Version 1.1

    SciTech Connect

    Kelleher, D. M.; Shipp, R. L.; Mason, J. D.

    2010-08-31

    Information Package Specification version 1.1 describes an XML document format called an information package that can be used to store information in information management systems and other information archives. An information package consists of package information, the context required to understand and use that information, package metadata that describes the information, and XML signatures that protect the information. The information package described in this specification was designed to store Department of Energy (DOE) and National Nuclear Security Administration (NNSA) information and includes the metadata required for that information: a unique package identifier, information marking that conforms to DOE and NNSA requirements, and access control metadata. It is an implementation of the Open Archival Information System (OAIS) Reference Model archival information package tailored to meet NNSA information storage requirements and designed to be used in the computing environments at the Y-12 National Security Complex and at other NNSA sites.

  15. PRIDE Surveillance Projects Data Packaging Project, Information Package Specification Version 1.0

    SciTech Connect

    Kelleher, D.M.; Shipp, R. L.; Mason, J. D.

    2009-09-28

    This document contains a specification for a standard XML document format called an information package that can be used to store information and the context required to understand and use that information in information management systems and other types of information archives. An information package consists of packaged information, a set of information metadata that describes the packaged information, and an XML signature that protects the packaged information. The information package described in this specification was designed to be used to store Department of Energy (DOE) and National Nuclear Security Administration (NNSA) information and includes the metadata required for that information: a unique package identifier, information marking that conforms to DOE and NNSA requirements, and access control metadata. Information package metadata can also include information search terms, package history, and notes. Packaged information can be text content, binary content, and the contents of files and other containers. A single information package can contain multiple types of information. All content not in a text form compatible with XML must be in a text encoding such as base64. Package information is protected by a digital XML signature that can be used to determine whether the information has changed since it was signed and to identify the source of the information. This specification has been tested but has not been used to create production information packages. The authors expect that gaps and unclear requirements in this specification will be identified as this specification is used to create information packages and as information stored in information packages is used. The authors expect to issue revised versions of this specification as needed to address these issues.

  16. Audit and Evaluation of the Georgia Comprehensive Career Guidance Project, Grades 7-12. Final Report.

    ERIC Educational Resources Information Center

    Walz, Garry R.; Benjamin, Libby

    An external evaluation was conducted to assess the training packages developed by the Georgia Comprehensive Career Guidance Project (see CE 018 130 for the final report of this project). Three secondary staff development training packages (Educational Environment, CE 018 154; Work and Leisure Environments, CE 018 161; and Human Relations, CE 018…

  17. Selecting Exemplary Compensatory Education Projects for Dissemination Via Project Information Packages. Report No. UR-242.

    ERIC Educational Resources Information Center

    Foat, Classie M.

    This report is the third technical report submitted to the U. S. Office of Education in connection with a study the overall purpose of which was to choose up to eight successful education programs serving underachieving, poor children and to design "Project Information Packages" for each of them. These Project Information Packages were to serve as…

  18. Project Management Plan 105-KE Basin sludge retrieval and packaging

    SciTech Connect

    McWethy, L.M.

    1994-11-07

    The KE Basin contains over 1,100 metric tons of spent nuclear fuel (SNF). The bulk of this inventory consists of over 50,000 zircaloy clad, uranium metal N-Reactor fuel element assemblies, along with less than half a metric ton of single-pass reactor fuel elements, stored in over 3,600 open top canister assemblies. In addition, sludge containing fissile and fission product material from damaged/degraded fuel has accumulated in the basin. The sludge, particularly the fines, impacts basin operations by clouding the water and making activities requiring a clear view impossible to complete until after sludge settles. Packaging would get the sludge out of the operator`s way and allow it to be moved within the basin in a more manageable state. The primary project objective is to develop, procure, and quality the equipment needed to remove all sludge from the KE Basin with minimal dose commitment, minimal cost, and on schedule. The project will provide: (1) the development, testing, and installation of equipment for sludge retrieval and packaging; (2) understanding of and experience with actual sludge through near-term sludge packaging feature tests in the KE Basin; (3) sludge removal and handling equipment required to support debris removal, fuel handling, and other activities involving sludge within the KE Basin; and (4) enlist industry expertise in all phases of the project. This Project Management Plant establishes the organizational responsibilities, control systems, and procedures for the execution of project activities for KE Basin sludge retrieval packaging, to meet programmatic requirements within authorized funding and approved schedules.

  19. N-STAR/IMAGE Project. Final report

    SciTech Connect

    Driver, R.K.

    1993-06-30

    This is the final report on the N*IMAGE project. It contains a brief abstract of the project background, objectives, efforts taken to achieve the objectives, and publications provided. The Soviet Union has devolved into various autonomous republics, each having individual nationalistic agendas, yet retaining many of the indigenous capabilities and facilities that were present prior to the dissolution of the USSR. Military forces, especially nuclear, still exist in spite of the changes in the overarching control hierarchy. The Commonwealth of Independent States [CIS] has been created, ostensibly maintaining control over the strategic forces of the now-defunct Soviet Union. These changes have created an identifiable need to understand the old forces in a new context. It is important to understand the political, social, and economic structures that bear on the new environment. Information on the individual republics and former Soviet Union is coming in at a staggering rate; it must be assimilated and analyzed while being careful not to lose those existing data points and analysis of Soviet information that are still relevant. The objective of the proposed FSRC work was to provide user-friendly, automated analytical tools to assist the analyst in assessing various aspects of Russia and CIS Nuclear Weapons. For each, the data package includes an extensive, free-form, interactive database system (N-STAR), a hierarchical structure of questions which lead an analyst through the essential elements of the related decisionmaking process (IMAGE), and an instruction manual explaining the use of the systems and their interrelationships. Relevant data su porting the analysis will be available in a standard format on the same system, facilitating data fusion and assessment. These analyst tools are in the form of Macintosh-compatible software systems (N-STAR and IMAGE) along with supporting documentation.

  20. MODEL 9975 LIFE EXTENSION PACKAGE 1 - FINAL REPORT

    SciTech Connect

    Daugherty, W.

    2011-03-04

    Life extension package LE1 (9975-03382) was instrumented and subjected to a temperature/humidity environment that bounds KAMS package storage conditions for 92 weeks. During this time, the maximum fiberboard temperature was {approx}180 F, and was established by a combination of internal heat (12 watts) and external heat ({approx}142 F). The relative humidity external to the package was maintained at 80 %RH. This package was removed from test in November 2010 after several degraded conditions were observed during a periodic examination. These conditions included degraded fiberboard (easily broken, bottom layer stuck to the drum), corrosion of the drum, and separation of the air shield from the upper fiberboard assembly. Several tests and parameters were used to characterize the package components. Results from these tests generally indicate agreement between this full-scale shipping package and small-scale laboratory tests on fiberboard and O-ring samples. These areas of agreement include the rate of fiberboard weight loss, change in fiberboard thermal conductivity, fiberboard compression strength, and O-ring compression set. In addition, this package provides an example of the extent to which moisture within the fiberboard can redistribute in the presence of a temperature gradient such as might be created by a 12 watt internal heat load. Much of the moisture near the fiberboard ID surface migrated towards the OD surface, but there was not a significant axial moisture gradient during most of the test duration. Only during the last inspection period (i.e. after 92 weeks exposure during the second phase) did enough moisture migrate to the bottom fiberboard layers to cause saturation. A side effect of moisture migration is the leaching of soluble compounds from the fiberboard. In particular, the corrosion observed on the drum appears related primarily to the leaching and concentration of chlorides. In most locations, this attack appears to be general corrosion, with

  1. MODEL 9975 LIFE EXTENSION PACKAGE 2 FINAL REPORT

    SciTech Connect

    Daugherty, W.

    2010-04-27

    Life extension package LE2 (9975-04162) was instrumented and subjected to an extreme temperature environment for 81 weeks. During this time, the maximum fiberboard temperature was {approx}240 - 250 degrees F, and was established by a combination of internal heat (19 watts) and external heat. This temperature matches the fiberboard continuous service rating, although such extremes are not expected for normal operation in KAMS. Several tests and parameters were used to characterize the package components. Results from these tests generally indicate agreement between this full-scale shipping package and small-scale laboratory tests on fiberboard and O-ring samples. These areas of agreement include the rate of fiberboard weight loss, change in fiberboard thermal conductivity, fiberboard compression strength, and O-ring compression set. In addition, this package provides an example of the extent to which moisture within the fiberboard can redistribute in the presence of a temperature gradient such as might be created by a 19 watt internal heat load. Moisture re distribution in this package was further exaggerated by a majority of the fiberboard being heated to above the boiling point of water. The majority of water within the fiberboard migrated to the bottom layers of fiberboard, where it contributed to accelerated degradation beyond that expected based solely on the temperature.

  2. Massachusetts Dissemination Project. Final Report.

    ERIC Educational Resources Information Center

    DiBella, Cecilia M.

    This report outlines the activities and impact of the Massachusetts Dissemination Project, a capacity-building program funded from 1976 to 1982 to further the dissemination of information on educational resources in Massachusetts. Major project outcomes are listed, including the production of two serials entitled Resources for Schools (26 issues)…

  3. Project Adelante. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Hubert, John A.; And Others

    An evaluation was conducted of "Project Adelante," an ESEA Title VII project supporting a Spanish-English bilingual education program in Hartford, Connecticut. The federal funding provided personnel for staff development, parent involvement, and evaluation over 5 years of a bilingual education program serving 600 Hispanic children in 3 elementary…

  4. Comprehensive Evaluation Project. Final Report.

    ERIC Educational Resources Information Center

    1969

    This project sought to develop a set of tests for the assessment of the basic literacy and occupational cognizance of pupils in those public elementary and secondary schools, including vocational schools, receiving services through Federally supported educational programs and projects. The assessment is to produce generalizable average scores for…

  5. Productivity Training Project Final Report.

    ERIC Educational Resources Information Center

    University of Southern Colorado, Pueblo.

    This report describes the Productivity Training Project (PTP), a partnership between the University of Southern Colorado and Latino Chamber of Commerce (LCC) of Pueblo. The project provided "new economy skills" training to employees of LCC member businesses and basic skills training to the unemployed or underemployed. The report explains how PTP…

  6. Diffusion Planning for the Right to Read Packaged Programs: A Supplement to the Final Report.

    ERIC Educational Resources Information Center

    Campeau, Peggie L.; Roberts, Sarah J.

    This supplement to the final report, "Identifying, Validating, and Multi-Media Packaging of Effective Reading Programs," was prepared for Right to Read for use in developing an effective plan for interesting potential users in examining and possibly adopting the validated, packaged programs. The six chapters in the document address key steps in…

  7. Project Dakota Final Report: 1983-1986.

    ERIC Educational Resources Information Center

    Kovach, JoAnne; Kjerland, Linda

    This final report describes Project Dakota, an early intervention demonstration project serving newborns to preschoolers with developmental delay or disability in Dakota County, Minnesota, from 1983 to 1986. The first chapter describes the project model (which focuses on increasing the effectiveness of parents in fostering the child's development)…

  8. Landfill gas project. Final report

    SciTech Connect

    1983-01-01

    The methane gas recovered from the landfill is used for space heating and water heating for the Florence-Lauderdale Humane Shelter 600 feet from the well head. The project to date and future development are described briefly. (MHR)

  9. Green Schools Project Final Report

    SciTech Connect

    Verdict, M.

    2000-09-27

    The Alliance to Save Energy has responded to interest in the Green Schools concept from the New England states of Maine, New Hampshire and Vermont. The Alliance conducted a train-the-trainers workshop in Augusta, Maine March 17--18, 1999. This work is part of a Green Schools replication project leveraged by funds from another source, NORDAX, which contributed $80,000 to provide partial support to staff at the Maine Energy Education Project (MEEP), Vermont Energy Education Program (VEEP), and New Hampshire Governor's Office to develop Green Schools Projects. DOE funds were used to conduct training, develop a network of state and local government, business and school partners to support school efficiency activities in those three states.

  10. Packaging and shipment of irradiated spent fuel. Final report

    SciTech Connect

    Kohli, R.; Lawrence, A.

    1988-10-01

    Irradiated spent fuel rods, rod sections, and other loose fuel were retrieved from various storage locations at the Battelle hot cells, packaged in stainless steel tubes, and inserted in a new basket assembly in preparation for shipment to EG&G Idaho. Few assemblies Connecticut Yankee S004 and Turkey Point 817 were also retrieved and prepared for shipment. All three fuel assemblies were loaded in shipping cask TN8-L and shipped to EG&G Idaho for storage.

  11. Computer Conferencing Project. Final Report.

    ERIC Educational Resources Information Center

    McNeil, Donald R.; And Others

    This report of a 3-year project discusses the results of the testing of computer conferencing and e-mail (electronic mail) at Montgomery College (Maryland) over a period of four semesters. The product was designed to answer the following questions: (1) Could computer conferencing or e-mail increase access? (2) Would the quality of the instruction…

  12. Project Career Exploration: Final Report.

    ERIC Educational Resources Information Center

    Schoenberger, R. Laurence

    Project Career Exploration's overall purpose was designing and implementing a method of providing juniors and seniors in high school with career exploration opportunities relative to the occupational programs offered by the Waukesha County Technical Institute and other postsecondary institutions. Course outlines make up the body of the report,…

  13. Project Open Door. Final Report.

    ERIC Educational Resources Information Center

    Verheyden-Hilliard, Mary Ellen

    The major purpose of Project Open Door was to design, develop, test, and disseminate a portable module for vocational educators and others to use with junior high school students in pre-vocational exploration free of sex stereotyping. The module produced contained a slide presentation with accompanying cassette tape and a leader's guide. An…

  14. Project HEED. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Hughes, Orval D.

    During 1972-73, Project HEED (Heed Ethnic Educational Depolarization) involved 1,350 Indian students in 60 classrooms at Sells, Topowa, San Carlos, Rice, Many Farms, Hotevilla, Peach Springs, and Sacaton. Primary objectives were: (1) improvement in reading skills, (2) development of cultural awareness, and (3) providing for the Special Education…

  15. Anthropometric Training Project. Final Report.

    ERIC Educational Resources Information Center

    San Diego State Coll., CA.

    The Anthropometric Training Project was aimed at providing a training program for select students to develop research competency in an area relating body type, composition, anthropometric assessment, and physical performance measures. The program involves interdisciplinary cooperation in training through seminars, laboratory practice, and…

  16. Competitive Skills Project. Final Report.

    ERIC Educational Resources Information Center

    El Camino Coll., Torrance, CA.

    Almost 180 (22.5 percent) of BP Chemicals/HITCO, Inc. (BPCHI) employees have participated in the basic skills courses offered through the Competitive Skills Project (CSP) at El Camino College (Torrance, California). Workplace basics provide a solid foundation for Total Quality Management (TQM), enabling workers to be globally competitive. Two main…

  17. Pilot Project Technology Business Case: Mobile Work Packages

    SciTech Connect

    Thomas, Ken; Lawrie, Sean; Niedermuller, Josef

    2015-05-01

    Performance advantages of the new pilot project technologies are widely acknowledged, but it has proven difficult for utilities to derive business cases for justifying investment in these new capabilities. Lack of a business case is often cited by utilities as a barrier to pursuing wide-scale application of digital technologies to nuclear plant work activities. The decision to move forward with funding usually hinges on demonstrating actual cost reductions that can be credited to budgets and thereby truly reduce O&M or capital costs. Technology enhancements, while enhancing work methods and making work more efficient, often fail to eliminate workload such that it changes overall staffing and material cost requirements. It is critical to demonstrate cost reductions or impacts on non-cost performance objectives in order for the business case to justify investment by nuclear operators. The Business Case Methodology (BCM) was developed in September of 2015 to frame the benefit side of II&C technologies to address the “benefit” side of the analysis—as opposed to the cost side—and how the organization evaluates discretionary projects (net present value (NPV), accounting effects of taxes, discount rates, etc.). The cost and analysis side is not particularly difficult for the organization and can usually be determined with a fair amount of precision (not withstanding implementation project cost overruns). It is in determining the “benefits” side of the analysis that utilities have more difficulty in technology projects and that is the focus of this methodology. The methodology is presented in the context of the entire process, but the tool provided is limited to determining the organizational benefits only. This report describes a the use of the BCM in building a business case for mobile work packages, which includes computer-based procedures and other automated elements of a work package. Key to those impacts will be identifying where the savings are

  18. The Development of Project Information Packages for the Dissemination of Effective Educational Programs.

    ERIC Educational Resources Information Center

    Foat, Classie M.; And Others

    The dissemination to schools of information about effective projects has been inadequate to bring about widespread replications. The purpose of this research was to test the feasibility of Project Information Packages (PIPs) as a means of widespread dissemination of effective programs. The study assumed that a project could be packaged with…

  19. Model Tech Prep Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    Southern Maryland Educational Consortium, La Plata.

    The Southern Maryland Educational Consortium's Tech Prep Model Demonstration project is described in this final report. The consortium members are Calvert, Charles, and St. Mary's county school districts and Charles County Community College in southern Maryland. The project is based on a 4 + 2 model in which ninth-grade students develop career…

  20. Pathways: Service Coordination Inservice Project. Final Report.

    ERIC Educational Resources Information Center

    Rosin, Peggy; And Others

    This final report describes the implementation and outcomes of a project designed to assist Wisconsin in meeting its need for qualified and appropriately trained personnel to carry out their new roles as service coordinators in the provision of early intervention services. The project's activities included: (1) development of a set of training…

  1. California Prison Gang Project. Final Report.

    ERIC Educational Resources Information Center

    Cummins, Eric

    A project investigated the cultural life, ideology, and education systems of particular prison gangs. It focused on recent changes in the gang system regarding gang education, organizational structure, and the balance of power in prisons and in relations with street gangs. Finally, the project assessed California's response to its prison gangs, in…

  2. The Let's Play! Project. Final Report.

    ERIC Educational Resources Information Center

    Mistrett, Susan

    This final report reviews activities and achievements of the "Let's Play!" project, an effort to apply assistive technology (AT) to promote the play skills of infants and toddlers with disabilities within their natural environments. The federally supported project was designed to assist county early intervention programs and developed,…

  3. Interagency Planning and Support Project. Final Report.

    ERIC Educational Resources Information Center

    Salisbury, Christine

    This final report describes the activities and outcomes of a federally funded project designed to develop, implement, and evaluate a systemically oriented process model for improving the coordination of education and human services for young children with identified disabilities and their families at the local level. The project developed and used…

  4. Spray casting project final report

    SciTech Connect

    Churnetski, S.R.; Thompson, J.E.

    1996-08-01

    Lockheed Martin Energy Systems, Inc. (Energy Systems), along with other participating organizations, has been exploring the feasibility of spray casting depleted uranium (DU) to near-net shape as a waste minimization effort. Although this technology would be useful in a variety of applications where DU was the material of choice, this effort was aimed primarily at gamma-shielding components for use in storage and transportation canisters for high-level radioactive waste, particularly in the Multipurpose Canister (MPC) application. In addition to the waste-minimization benefits, spray casting would simplify the manufacturing process by allowing the shielding components for MPC to be produced as a single component, as opposed to multiple components with many fabrication and assembly steps. In earlier experiments, surrogate materials were used to simulate the properties (specifically reactivity and density) of DU. Based on the positive results from those studies, the project participants decided that further evaluation of the issues and concerns that would accompany spraying DU was warranted. That evaluation occupied substantially all of Fiscal Year 1995, yielding conceptual designs for both an intermediate facility and a production facility and their associated engineering estimates. An intermediate facility was included in this study to allow further technology development in spraying DU. Although spraying DU to near-net shape seems to be feasible, a number of technical, engineering, and safety issues would need to be evaluated before proceeding with a production facility. This report is intended to document the results from the spray-casting project and to provide information needed by anyone interested in proceeding to the next step.

  5. Lagoon Restoration Project: Final report

    SciTech Connect

    1995-03-01

    This project is a multiyear effort focusing on energy flow in the Palace of Fine Arts lagoon just outside the Exploratorium in San Francisco. Phase 1 was a pilot study to determine the feasibility of improving biological energy flow through the small freshwater lagoon, using the expertise and resources of an environmental artist in collaboration with museum biologists and arts department staff. The primary outcome of Phase 1 is an experimental fountain exhibit inside the museum designed by public artist Laurie Lundquist with Exploratorium staff. This fountain, with signage, functions both as a model for natural aeration and filtration systems and as a focal point for museum visitors to learn about how biological processes cycle energy through aquatic systems. As part of the study of the lagoon`s health, volunteers continued biweekly bird consus from March through September, 1994. The goal was to find out whether the poor water quality of the lagoon is affecting the birds. Limited dredging was undertaken by the city Parks and Recreation Department. However, a more peermanent solution to the lagoon`s ecological problems would require an ambitious redesign of the lagoon.

  6. Decontamination techniques applicable to waste packages: Final report

    SciTech Connect

    Not Available

    1988-03-01

    This report presents an evaluation of methods for decontamination of reference waste canisters and waste containers. The potential use of chemical solvents, ultrasonics, liquid abrasive blasting, vibratory finishing, electropolishing, liquid honing, high-pressure steam/water spraying, and fixatives as decontamination techniques for outer waste package and canister surfaces is discussed. Either test results or available literature on these techniques were examined to assess applicability of the methods. Pertinent technical considerations for each method are presented and discussed. Electropolishing and liquid abrasive blasting are the processes recommended for remote decontamination of waste overpacks and canisters. These processes are recommended on the basis of a number of factors including the type of contaminants present; the geometric configurations and materials; the accessibility, size, and mass of the units; and the time available to perform the process. Representative process conceptual designs for electropolishing and liquid abrasive blasting are presented in this report. Major equipment items and process operations are discussed. Secondary waste treatment and disposal requirements are also briefly discussed. 16 refs., 7 figs., 4 tabs.

  7. Production of a Multi-Media Package to Promote Positive Parental Attitudes toward Non-Traditional Vocational Education. Final Report. Project Dates: July 1, 1979 to April 30, 1980.

    ERIC Educational Resources Information Center

    Wiles, Richard L.

    A Pennsylvania project produced a multi-media program designed to increase awareness of and change attitudes about occupational sex-role stereotyping among parents of present and future students in vocational education. The multi-media program consisted of a fifteen-minute color/sound motion picture on nontraditional careers entitled "Vocational…

  8. Expedited technology demonstration project final report: final forms

    SciTech Connect

    Hopper, R W

    1999-05-01

    ETDP Final Forms was an attempt to demonstrate the fabrication and performance of a ceramic waste form immobilizing the hazardous and radioactive elements of the MSO/SR mineral residues. The ceramic material had been developed previously. The fabrication system was constructed and functioned as designed except for the granulator. Fabrication of our particular ceramic, however, proved unsatisfactory. The ceramic material design was therefore changed toward the end of the project, replacing nepheline with zircon as the sink for silica. Preliminary results were encouraging, but more development is needed. Fabrication of the new ceramic requires major changes in the processing: Calcination and granulation would be replaced by spray drying; and sintering would be at higher temperature. The main goal of the project--demonstrating the fabrication and performance of the waste form--was not achieved. This report summarizes Final Forms' activities. The problem of immobilizing the MSO/SR mineral residues is discussed.

  9. Preliminary selection criteria for the Yucca Mountain Project waste package container material

    SciTech Connect

    Halsey, W.G.

    1991-01-01

    The Department of Energy`s Yucca Mountain Project (YMP) is evaluating a site at Yucca Mountain in Nevada for construction of a geologic repository for the storage of high-level nuclear waste. Lawrence Livermore National Laboratory`s (LLNL) Nuclear Waste Management Project (NWMP) has the responsibility for design, testing, and performance analysis of the waste packages. The design is performed in an iterative manner in three sequential phases (conceptual design, advanced conceptual design, and license application design). An important input to the start of the advanced conceptual design is the selection of the material for the waste containers. The container material is referred to as the `metal barrier` portion of the waste package, and is the responsibility of the Metal Barrier Selection and Testing task at LLNL. The selection will consist of several steps. First, preliminary, material-independent selection criteria will be established based on the performance goals for the container. Second, a variety of engineering materials will be evaluated against these criteria in a screening process to identify candidate materials. Third, information will be obtained on the performance of the candidate materials, and final selection criteria and quantitative weighting factors will be established based on the waste package design requirements. Finally, the candidate materials will be ranked against these criteria to determine whether they meet the mandated performance requirements, and to provide a comparative score to choose the material for advanced conceptual design activities. This document sets forth the preliminary container material selection criteria to be used in screening candidate materials. 5 refs.

  10. Structuring the Classroom for Success; Production and Evaluation of a Mediated Teacher Training Package. Final Report.

    ERIC Educational Resources Information Center

    Watts, Charles A.; And Others

    The project was concerned with development and evaluation of an auto-instructional media package (six sound strips and a guidebook) intended to enable teachers to design an effective classroom environment, to manage learner behavior, and to sequence instructional materials. Four groups of preservice and inservice teachers (88 university education…

  11. Identifying, Validating, and Multi-Media Packaging of Effective Reading Programs. Final Report.

    ERIC Educational Resources Information Center

    Bowers, John E.; And Others

    The major aim of this project was to develop dissemination packages for reading programs that had demonstrated effectiveness in improving reading achievement. The search involved a review of past research studies, computer stored abstracts, and library materials, as well as the obtaining of nominations from experts in the field and from the staff…

  12. Zoo Project for Handicapped Children. Final Project Report.

    ERIC Educational Resources Information Center

    San Diego Unified School District, CA.

    Presented is the final report (1971-72) of San Diego's Zoo Project for Handicapped Children, designed to increase the language arts skills of 870 trainable or educable mentally handicapped or educationally handicapped children through the use of animals as motivating devices. The program included a teacher training program enabling teachers to…

  13. Waste Package Project quarterly report, July 1, 1995--September 30, 1995

    SciTech Connect

    Ladkany, S.G.

    1995-11-15

    The following tasks are reported: overview and progress of nuclear waste package project and container design; nuclear waste container design considerations; structural investigation of multi purpose nuclear waste package canister; and design requirements of rock tunnel drift for long-term storage of high-level waste (faulted tunnel model study by photoelasticity/finite element analysis).

  14. Salt Repository Project: Waste Package Program (WPP) modeling activiteis: FY 1984 annual report

    SciTech Connect

    Kuhn, W.L.; Simonson, S.A.; Pulsipher, B.A.

    1987-03-01

    The Pacific Northwest Laboratory (PNL) is supporting the US Department of Energy's (DOE) Salt Repository Project (SRP) through its Waste Package Program (WPP). During FY 1984, the WPP continued its program of waste package component development and interactions testing and application of the resulting data base to develop predictive models describing waste package degradation and radionuclide release. Within the WPP, the Modeling Task (Task 04 during FY 1984) was conducted to interpret the tests in such a way that scientifically defensible models can be developed for use in qualification of the waste package.

  15. Dissemination Package for Transition into Electronics (TIE) Project, October 1979-June 1980.

    ERIC Educational Resources Information Center

    Evergreen Valley Coll., San Jose, CA.

    This dissemination package consists of a variety of advertising materials, forms, questionnaires, tests, and handouts developed as a part of the Transition into Electronics (TIE) Project. (The TIE Project was a project that developed, implemented, and evaluated a model designed to encourage persons to pursue education and training leading to…

  16. Remote handling in the Plutonium Immobilization Project: Puck packaging

    SciTech Connect

    Kriikku, E.

    1999-07-01

    The Savannah River Site (SRS) will immobilize excess plutonium in the proposed Plutonium Immobilization Project (PIP). The PIP scope includes unloading transportation containers, preparing the feed streams, converting the metal feed to an oxide, adding the ceramic precursors, pressing the pucks, inspecting pucks, and sintering pucks. The PIP scope also includes loading the pucks into metal cans, sealing the cans, inspecting the cans, loading the cans into magazines, loading magazines into Defense Waste Processing Facility (DWPF) canisters, and transporting the canisters to the DWPF. The DWPF will fill the canister with a mixture of high-level waste and glass for permanent storage. Because of the radiation, remote equipment will perform PIP operations in a contained environment. The PIP puck packaging includes loading pucks into metal cans, sealing the cans, and inspecting the cans. A magnetically coupled elevator will lower a tray of pucks onto a magnetically coupled transport cart. This cart will carry the tray through an air lock into the can-loading glove box. Inside the glove box, a magnetically coupled tray lifter will raise the tray off the cart. A three-axis Cartesian robot will use a vacuum cup on a long pipe to lift the 67.3-mm (2.65-in.)-diam, 25.4-mm (1.0-in.)-tall pucks from the transfer tray and place 20 pucks in a 76.2-mm (3.0-in.)-diam stainless steel can. The Cartesian robot will place a custom hood on the open metal can, and this hood will remove the air from the can, insert helium, and place a hollow plug in the can. The SRS-developed bagless transfer system will weld the plug to the can wall and cut the can in the weld area. The can stub and the upper plug half above the cut line will remain in the sphincter seal to maintain the glove-box seal. The puck can and the lower plug half below the cut line is lowered into the bagless transfer enclosure. A floor-mounted robot in this enclosure will swipe the can exterior for contamination and place the

  17. Biomedical Interdisciplinary Curriculum Project: BIP (Biomedical Instrumentation Package) User's Manual.

    ERIC Educational Resources Information Center

    Biomedical Interdisciplinary Curriculum Project, Berkeley, CA.

    Described is the Biomedical Instrument Package (BIP) and its use. The BIP was developed for use in understanding colorimetry, sound, electricity, and bioelectric phenomena. It can also be used in a wide range of measurements such as current, voltage, resistance, temperature, and pH. Though it was developed primarily for use in biomedical science…

  18. Individualized Instruction in Science, Earth Space Project, Learning Activities Package.

    ERIC Educational Resources Information Center

    Kuczma, R. M.

    Learning Activity Packages (LAP) relating to the earth and space are presented for use in sampling a new type of learning for a whole year. Eighteen topics are incorporated into five units: (1) introduction to individualized learning, (2) observation versus interpretation, (3) chemistry in the space age, (4) the space age interdisciplines, and (5)…

  19. Videotape Project in Child Variance. Final Report.

    ERIC Educational Resources Information Center

    Morse, William C.; Smith, Judith M.

    The design, production, dissemination, and evaluation of a series of videotaped training packages designed to enable teachers, parents, and paraprofessionals to interpret child variance in light of personal and alternative perspectives of behavior are discussed. The goal of each package is to highlight unique contributions of different theoretical…

  20. Northeast Oregon Hatchery Project, Final Siting Report.

    SciTech Connect

    Watson, Montgomery

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  1. Final Report for the NERI Project

    SciTech Connect

    John C. Lee

    2009-03-31

    This final report summarizes the research activities during the entire performance period of the NERI grant, including the extra 9 months granted under a no-cost time extension. Building up on the 14 quarterly reports submitted through October 2008, we present here an overview of the research accomplishments under the five tasks originally proposed in July 2004, together with citations for publications resulting from the project. The AFCI-NERI project provided excellent support for two undergraduate and 10 graduates students at the University of Michigan during a period of three years and nine months. Significant developments were achieved in three areas: (1) Efficient deterministic fuel cycle optimization algorithms both for PWR and SFR configurations, (2) Efficient search algorithm for PWR equilibrium cycles, and (3) Simplified Excel-based script for dynamic fuel cycle analysis of diverse cycles. The project resulted in a total of 8 conference papers and three journal papers, including two that will be submitted shortly. Three pending publications are attached to the report.

  2. Griffith Energy Project Final Environmental Impact Statement

    SciTech Connect

    N /A

    1999-04-02

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.

  3. The LiveWire Project final report

    SciTech Connect

    Brown, C.D.; Nelson, T.T.; Kelly, J.C.; Dominguez, H.A.

    1997-10-01

    Utilities across the US have begun pilot testing a variety of hardware and software products to develop a two-way communications system between themselves and their customers. Their purpose is to reduce utility operating costs and to provide new and improved services for customers in light of pending changes in the electric industry being brought about by deregulation. A consortium including utilities, national labs, consultants, and contractors, with the support of the Department of Energy (DOE) and the Electric Power Research Institute (EPRI), initiated a project that utilized a hybrid fiber-coax (HFC) wide-area network integrated with a CEBus based local area network within the customers home. The system combined energy consumption data taken within the home, and home automation features to provide a suite of energy management services for residential customers. The information was transferred via the Internet through the HFC network, and presented to the customer on their personal computer. This final project report discusses the design, prototype testing, and system deployment planning of the energy management system.

  4. Ice Load Project Final Technical Report

    SciTech Connect

    McCoy, Timothy J.; Brown, Thomas; Byrne, Alex

    2014-10-30

    As interest and investment in offshore wind projects increase worldwide, some turbines will be installed in locations where ice of significant thickness forms on the water surface. This ice moves under the driving forces of wind, current, and thermal effects and may result in substantial forces on bottom-fixed support structures. The North and Baltic Seas in Europe have begun to see significant wind energy development and the Great Lakes of the United States and Canada may host wind energy development in the near future. Design of the support structures for these projects is best performed through the use of an integrated tool that can calculate the cumulative effects of forces due to turbine operations, wind, waves, and floating ice. The dynamic nature of ice forces requires that these forces be included in the design simulations, rather than added as static forces to simulation results. The International Electrotechnical Commission (IEC) standard[2] for offshore wind turbine design and the International Organization for Standardization (ISO) standard[3] for offshore structures provide requirements and algorithms for the calculation of forces induced by surface ice; however, currently none of the major wind turbine dynamic simulation codes provides the ability to model ice loads. The scope of work of the project described in this report includes the development of a suite of subroutines, collectively named IceFloe, that meet the requirements of the IEC and ISO standards and couples with four of the major wind turbine dynamic simulation codes. The mechanisms by which ice forces impinge on offshore structures generally include the forces required for crushing of the ice against vertical-sided structures and the forces required to fracture the ice as it rides up on conical-sided structures. Within these two broad categories, the dynamic character of the forces with respect to time is also dependent on other factors such as the velocity and thickness of the moving ice

  5. Data processing unit and power system for the LANL REM instrument package. Final report

    SciTech Connect

    Lockhart, W.

    1994-03-01

    The NEPSTP spacecraft needs highly reliable instrumentation to measure the nuclear reactor health and performance. These reactor measurements are essential for initial on-orbit phase operations and documentation of performance over time. Los Alamos National Laboratory (LANL), under the guidance of W. C. Feldman, principal investigator, has designed the Radiation Environment Monitoring (REM) package to meet these needs. The instrumentation package contains two neutron detectors, one gamma-ray detector, a data processing unit, and an instrument power system. The REM package is an integration of quick turn-around, state of the practice technology for detectors, data processors, and power systems. A significant portion of REM consists of subsystems with flight history. Southwest Research Institute (SwRI) has been tasked by LANL to design support electronics, including the Data Processing Unit (DPU) and Power System for REM. The goal for this project is to use technologies from current programs to speed up and simplify the design process. To meet these design goals, the authors use an open architecture VME bus for the DPU and derivatives of CASSINI power supplies for the instrument power system. To simplify integration and test activities, they incorporate a proven software development strategy and tool kits from outside vendors. The objective of this report is to illustrate easily incorporated system level designs for the DPU, power system and ground support electronics (GSE) in support of the important NEPSTP program.

  6. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan...

  7. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan...

  8. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan...

  9. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan...

  10. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan...

  11. The Women Entrepreneurs Project. Final Report.

    ERIC Educational Resources Information Center

    McCaslin, Barbara S.; And Others

    Business ownership training materials appropriate for uses in vocational education settings with women clients were developed and tested. A survey of California women business owners was made to identify the characteristics and needs of women entrepreneurs. A series of eight self-paced, student-centered Learning Activities Packages (LAP's) was…

  12. User's Guide for MapIMG 2: Map Image Re-projection Software Package

    USGS Publications Warehouse

    Finn, Michael P.; Trent, Jason R.; Buehler, Robert A.

    2006-01-01

    BACKGROUND Scientists routinely accomplish small-scale geospatial modeling in the raster domain, using high-resolution datasets for large parts of continents and low-resolution to high-resolution datasets for the entire globe. Direct implementation of point-to-point transformation with appropriate functions yields the variety of projections available in commercial software packages, but implementation with data other than points requires specific adaptation of the transformation equations or prior preparation of the data to allow the transformation to succeed. It seems that some of these packages use the U.S. Geological Survey's (USGS) General Cartographic Transformation Package (GCTP) or similar point transformations without adaptation to the specific characteristics of raster data (Usery and others, 2003a). Usery and others (2003b) compiled and tabulated the accuracy of categorical areas in projected raster datasets of global extent. Based on the shortcomings identified in these studies, geographers and applications programmers at the USGS expanded and evolved a USGS software package, MapIMG, for raster map projection transformation (Finn and Trent, 2004). Daniel R. Steinwand of Science Applications International Corporation, National Center for Earth Resources Observation and Science, originally developed MapIMG for the USGS, basing it on GCTP. Through previous and continuing efforts at the USGS' National Geospatial Technical Operations Center, this program has been transformed from an application based on command line input into a software package based on a graphical user interface for Windows, Linux, and other UNIX machines.

  13. Report on task assignment No. 3 for the Waste Package Project; Parts A & B, ASME pressure vessel codes review for waste package application; Part C, Library search for reliability/failure rates data on low temperature low pressure piping, containers, and casks with long design lives

    SciTech Connect

    Trabia, M.B.; Kiley, M.; Cardle, J.; Joseph, M.

    1991-07-01

    The Waste Package Project Research Team, at UNLV, has four general required tasks. Task one is the management, quality assurance, and overview of the research that is performed under the cooperative agreement. Task two is the structural analysis of spent fuel and high level waste. Task three is an American Society of Mechanical Engineers (ASME) Pressure Vessel Code review for waste package application. Finally, task four is waste package labeling. This report includes preliminary information about task three (ASME Pressure Vessel Code review for Waste package Application). The first objective is to compile a list of the ASME Pressure Vessel Code that can be applied to waste package containers design and manufacturing processes. The second objective is to explore the use of these applicable codes to the preliminary waste package container designs. The final objective is to perform a library search for reliability and/or failure rates data on low pressure, low temperature, containers and casks with long design lives.

  14. The Education North Evaluation Project. Final Report.

    ERIC Educational Resources Information Center

    Ingram, E. J.; McIntosh, R. G.

    The Education North Evaluation Project monitored operation of the Education North Project (a 1978-82 project aimed at encouraging parents, teachers, and other community members in small, isolated northern Alberta communities to work together in improving the quality of education for school-aged children), assessed project outcomes, and developed…

  15. The Experimental Aviation Technology Education Project Curriculum Package.

    ERIC Educational Resources Information Center

    Federal Aviation Administration (DOT), Washington, DC.

    This report was compiled by the Manpower and Planning Staff of the Federal Aviation Administration to provide information about the educational and training requirements for air traffic controllers and other related occupations. The purpose of the project was to help colleges plan programs to meet manpower needs. The document consists of: (1)…

  16. Keys to School Boardsmanship Project. Rural Education Program Final Report.

    ERIC Educational Resources Information Center

    Northwest Regional Educational Lab., Portland, OR.

    Beginning in 1978, the Rural Education Program at the Northwest Regional Educational Laboratory developed materials of the Keys to School Boardsmanship Project for local school boards, including 13 workshop packages and 2 films. A policy board, with members from the five northwest state associations of local school boards, defined topics to be…

  17. TX-100 manufacturing final project report.

    SciTech Connect

    Ashwill, Thomas D.; Berry, Derek S.

    2007-11-01

    This report details the work completed under the TX-100 blade manufacturing portion of the Carbon-Hybrid Blade Developments: Standard and Twist-Coupled Prototype project. The TX-100 blade is a 9 meter prototype blade designed with bend-twist coupling to augment the mitigation of peak loads during normal turbine operation. This structural coupling was achieved by locating off axis carbon fiber in the outboard portion of the blade skins. The report will present the tooling selection, blade production, blade instrumentation, blade shipping and adapter plate design and fabrication. The baseline blade used for this project was the ERS-100 (Revision D) wind turbine blade. The molds used for the production of the TX-100 were originally built for the production of the CX-100 blade. The same high pressure and low pressure skin molds were used to manufacture the TX-100 skins. In order to compensate for the difference in skin thickness between the CX-100 and the TX-100, however, a new TX-100 shear web plug and mold were required. Both the blade assembly fixture and the root stud insertion fixture used for the CX-100 blades could be utilized for the TX-100 blades. A production run of seven TX-100 prototype blades was undertaken at TPI Composites during the month of October, 2004. Of those seven blades, four were instrumented with strain gauges before final assembly. After production at the TPI Composites facility in Rhode Island, the blades were shipped to various test sites: two blades to the National Wind Technology Center at the National Renewable Energy Laboratory in Boulder, Colorado, two blades to Sandia National Laboratory in Albuquerque, New Mexico and three blades to the United States Department of Agriculture turbine field test facility in Bushland, Texas. An adapter plate was designed to allow the TX-100 blades to be installed on existing Micon 65/13M turbines at the USDA site. The conclusion of this program is the kick-off of the TX-100 blade testing at the three

  18. Alternative Youth Employment Strategies Project: Final Report.

    ERIC Educational Resources Information Center

    Sadd, Susan; And Others

    The Alternative Youth Employment Strategies (AYES) Project began as one of the demonstration projects funded under the Youth Employment and Demonstration Project Act in 1980. The program, which features three training models, is targeted toward high-risk, disadvantaged youth, especially minority youths from urban areas who had prior involvement…

  19. The Utah Newspaper Project. Final Report.

    ERIC Educational Resources Information Center

    Holley, Robert P.

    As part of the United States Newspaper Program, the Marriott Library at the University of Utah undertook the Utah Newspaper Project, a major microfilming project funded by the National Endowment for the Humanities. This report reviews the background of the project, describes the grant application process, and discusses the activities of: (1) the…

  20. The PIE Institute Project: Final Evaluation Report

    ERIC Educational Resources Information Center

    St. John, Mark; Carroll, Becky; Helms, Jen; Smith, Anita

    2008-01-01

    The Playful Invention and Exploration (PIE) Institute project was funded in 2005 by the National Science Foundation (NSF). For the past three years, Inverness Research has served as the external evaluator for the PIE project. The authors' evaluation efforts have included extensive observation and documentation of PIE project activities; ongoing…

  1. 23 CFR 661.27 - What does a complete application package for construction consist of and how does the project...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... ROAD BRIDGE PROGRAM § 661.27 What does a complete application package for construction consist of and how does the project receive funding? (a) A complete application package for construction consists of... construction consist of and how does the project receive funding? 661.27 Section 661.27 Highways...

  2. 23 CFR 661.27 - What does a complete application package for construction consist of and how does the project...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ROAD BRIDGE PROGRAM § 661.27 What does a complete application package for construction consist of and how does the project receive funding? (a) A complete application package for construction consists of... construction consist of and how does the project receive funding? 661.27 Section 661.27 Highways...

  3. 23 CFR 661.27 - What does a complete application package for construction consist of and how does the project...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... ROAD BRIDGE PROGRAM § 661.27 What does a complete application package for construction consist of and how does the project receive funding? (a) A complete application package for construction consists of... construction consist of and how does the project receive funding? 661.27 Section 661.27 Highways...

  4. Energy Storage and Distributed Energy Generation Project, Final Project Report

    SciTech Connect

    Schwank, Johannes; Mader, Jerry; Chen, Xiaoyin; Mi, Chris; Linic, Suljo; Sastry, Ann Marie; Stefanopoulou, Anna; Thompson, Levi; Varde, Keshav

    2008-03-31

    This report serves as a Final Report under the “Energy Storage and Distribution Energy Generation Project” carried out by the Transportation Energy Center (TEC) at the University of Michigan (UM). An interdisciplinary research team has been working on fundamental and applied research on: -distributed power generation and microgrids, -power electronics, and -advanced energy storage. The long-term objective of the project was to provide a framework for identifying fundamental research solutions to technology challenges of transmission and distribution, with special emphasis on distributed power generation, energy storage, control methodologies, and power electronics for microgrids, and to develop enabling technologies for novel energy storage and harvesting concepts that can be simulated, tested, and scaled up to provide relief for both underserved and overstressed portions of the Nation’s grid. TEC’s research is closely associated with Sections 5.0 and 6.0 of the DOE "Five-year Program Plan for FY2008 to FY2012 for Electric Transmission and Distribution Programs, August 2006.”

  5. Career Based Curriculum Project. Final Report.

    ERIC Educational Resources Information Center

    Union County School District, Monroe, NC.

    A three-year (1974-77) K-14 Career Based Curriculum (CBC) project was conducted in Union County, North Carolina, to implement career education concepts into four elementary schools, two middle schools, and four senior high schools. During the third year of the project, a career center serving the secondary schools and the community was opened. The…

  6. Human Relations Education Project. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Buffalo Board of Education, NY.

    This project did the planning and pilot phases of an effort to improve the teaching of human relations in grades K-12 of public and private schools in the Buffalo-Niagara Falls metropolitan area. In the pilot phase, the project furnished on-the-job training for approximately 70 schools. The training was given by teams of human relations…

  7. The Appalachian Education Satellite Project Final Report.

    ERIC Educational Resources Information Center

    Appalachian Education Satellite Project, Lexington, KY.

    The first section of this report describes the objectives, project organization, and program of the Appalachian Education Satellite Project. The second section describes the resource coordinating centers and their seven missions: reading course development, career education course development for K-6 and 7-12, four-channel audio program…

  8. Community College Technical Mathematics Project. Final Report.

    ERIC Educational Resources Information Center

    Self, Samuel L.

    The purpose of the research project was to develop an applied or technical mathematics curriculum which would meet the needs of vocational-technical students at the community college level. The research project was divided into three distinct phases: Identifying the mathematical concepts requisite for job-entry competencies in each of the…

  9. New and Emerging Occupations Project. Final Report.

    ERIC Educational Resources Information Center

    Southeast Community Coll., Lincoln, NE.

    This document reports a project to define, identify, and describe new and emerging occupations in Nebraska and disseminate that information to vocational education program and curriculum planners. Chapter 1 describes the background, problem, and purpose of the project. Chapter 2 sets forth the objectives and discusses procedures for developing a…

  10. Project Final Report: HPC-Colony II

    SciTech Connect

    Jones, Terry R; Kale, Laxmikant V; Moreira, Jose

    2013-11-01

    This report recounts the HPC Colony II Project which was a computer science effort funded by DOE's Advanced Scientific Computing Research office. The project included researchers from ORNL, IBM, and the University of Illinois at Urbana-Champaign. The topic of the effort was adaptive system software for extreme scale parallel machines. A description of findings is included.

  11. Hispanic Vocational Exploration Project. Final Report.

    ERIC Educational Resources Information Center

    Centro De La Comunidad, Inc., New London, CT.

    During its second year, the Hispanic Vocational Exploration Project recruited eighth and ninth grade Hispanic youth for a four-week cycle, after-school, career exploratory program at Southeastern Regional Vocational Technical School, Groton, Connecticut. A series of career education workshops was the other major project activity. Supportive…

  12. ADD Special Projects Grant. Final Report.

    ERIC Educational Resources Information Center

    Wortham, Jocelyn F.

    The purpose of this five-year project was to prepare administrators, general and special education teachers, and parents to meet the needs of children with attention deficit hyperactivity disorders (ADHD). The project developed five self-instructional ADHD inservice preparation manuals for national and state dissemination and implemented an ADHD…

  13. Project Future Workplace Literacy Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Jefferson County Public Schools, Louisville, KY.

    Project Future was a 3-year project begun in 1994 as a partnership between the Jefferson County Public Schools and Futura Plastics and Engineering, Inc., Louisville, Kentucky. The project targeted the workplace basic skills of plastic injection molding production workers. The skills classes improved the general education of the workers with…

  14. Project Kaleidoscope, 1996-2000. Final Report: Executive Summary.

    ERIC Educational Resources Information Center

    George Mason Univ., Fairfax, VA. Helen A. Kellar Inst. for Human disAbilities.

    This final report describes the activities and outcomes of Project Kaleidoscope, a grant funded project designed to develop, field test, and disseminate training materials and methods to prepare personnel to better serve culturally, linguistically and developmentally diverse young children and their families. The project addressed the central…

  15. Project Recurso, 1989-1990. Final Evaluation Report. OREA Report.

    ERIC Educational Resources Information Center

    Rivera, Natasha

    This report presents final (fifth year) results of Project Recurso, a federally funded project which provided 147 Spanish-speaking special education students (grades 3-5) in 12 New York City schools with instruction in English as a Second Language (ESL), Native Language Arts (NLA), and bilingual content area subjects. The project also provided…

  16. 2+2+2 Dissemination Project Final Report.

    ERIC Educational Resources Information Center

    Sloane, Diana; And Others

    An overview is provided in this three-part final report of a project designed to disseminate information to assist California high schools, Regional Occupation Programs, and colleges in developing and strengthening 2+2+2 programs. Part I reviews the following project objectives: (1) hire a project coordinator and technical assistant; (2) develop a…

  17. The NICU Follow-Through Project. Final Report.

    ERIC Educational Resources Information Center

    Bennett, Forrest C.; Hedlund, Rodd E.

    This final report describes activities and accomplishments of the NICU Follow-Through Project, a 3-year project designed to help hospital neonatal intensive care units (NICUs) and community developmental centers serving infants with disabilities or very low birth weights (VLBW) replicate the project's innovative and successful training components.…

  18. Smart Gun Technology project. Final report

    SciTech Connect

    Weiss, D.R.

    1996-05-01

    The goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user form firing a law officer`s firearm by implementing user-recognizing-and-authorizing (or {open_quotes}smart{close_quotes}) surety technologies. This project was funded by the National Institute of Justice. This report lists the findings and results of the project`s three primary objectives. First, to find and document the requirements for a smart firearm technology that law enforcement officers will value. Second, to investigate, evaluate, and prioritize technologies that meet the requirements for a law enforcement officer`s smart firearm. Third, to demonstrate and document the most promising technology`s usefulness in models of a smart firearm.

  19. A Recruitment Package for Postsecondary Vocational Education. Final From August 1, 1983 to August 31, 1984. Final Report.

    ERIC Educational Resources Information Center

    Waltz, Freddie C.; And Others

    This recruitment package consists of materials designed to assist those individuals who are responsible for recruiting students into postsecondary vocational education programs. The package, which may be used either as a guide to establishing and implementing a new promotional policy or as a resource to use when planning a specific promotional…

  20. NYU Ultracomputer project. Final project summary, 1979-1993

    SciTech Connect

    Gottlieb, A.

    1994-10-01

    This report discusses the following on the Ultracomputer project: simulation studies; network analysis; prototype hardware; VSLI design; coordination algorithms; systems software; application software; and compiler development.

  1. Southeast geysers effluent pipeline project. Final report

    SciTech Connect

    Dellinger, M.

    1998-01-15

    The project concept originated in 1990 with the convergence of two problems: (1) a need for augmented injection to mitigate declining reservoir productivity at the Geysers; and (2) a need for a new method of wastewater disposal for Lake County communities near the The Geysers. A public/private partnership of Geysers operators and the Lake County Sanitation District (LACOSAN) was formed in 1991 to conduct a series of engineering, environmental, and financing studies of transporting treated wastewater effluent from the communities to the southeast portion of The Geysers via a 29-mile pipeline. By 1994, these evaluations concluded that the concept was feasible and the stakeholders proceeded to formally develop the project, including pipeline and associated facilities design; preparation of an environmental impact statement; negotiation of construction and operating agreements; and assembly of $45 million in construction funding from the stakeholders, and from state and federal agencies with related program goals. The project development process culminated in the system`s dedication on October 16, 1997. As of this writing, all project components have been constructed or installed, successfully tested in compliance with design specifications, and are operating satisfactorily.

  2. Vermont gasifier project. Final report, Phase I

    SciTech Connect

    1995-07-01

    This report presents an engineering status report for the Vermont gasifier project. Technical areas of concern are discussed with the cyclone performance, agglomeration problems in the combustor, particlate emissions, valve design, deflagration venting, gasifier and combustion blower surge control, and other related areas. Attachments pertaining to the drawing and specification register are included.

  3. MHEC Minority Faculty Development Project. Final Report.

    ERIC Educational Resources Information Center

    Myers, Samuel L.; Wilkins, Roy

    As part of a two-year Midwestern Higher Education Commission (MHEC) initiative, this project provided essential background and planning information on minority faculty representation in Midwestern higher education, and proposed regional strategies to advance minority faculty recruitment and retention in Midwestern institutions of higher education.…

  4. MASFILE-I Pilot Project. Final Report.

    ERIC Educational Resources Information Center

    Five Associated Univ. Libraries, Syracuse, NY.

    The objectives of the MASFILE-I Pilot Project were (1) to test the utility and cost of compiling a manipulative data base from remote card files; (2) to test the utility of the Administrative Terminal System (ATS) for inputting bibliographic data into computer files from catalog card copy at a central location; (3) to test the adequacy of a…

  5. Labor Exchange Skills Project. Final Report.

    ERIC Educational Resources Information Center

    Dietrich, Eleanor; Hendrickson-Larson, Joanna; Hoppe, Ruth; Paige, Bruce; Rosenow, Steve

    The Labor Exchange Skills Project, which was conducted under the sponsorship and direction of the U.S. Department of Labor, Employment and Training Administration, was designed to develop a labor exchange skills database (ETA) that would improve the usability of many Department of Labor applications and products developed by other public and…

  6. Jefferson County Adult Reading Project. Final Report.

    ERIC Educational Resources Information Center

    Jefferson County Board of Education, Louisville, KY.

    The 1980-81 Jefferson County (Kentucky) Adult Reading Program served 601 students functioning below 6.0 grade level during the 1980-81 year. The project's instructional methods and materials were developed based on the experiences of the program for the previous two years. The program was considered a success not only from the viewpoint of the…

  7. American History Laboratory Project. Final Report.

    ERIC Educational Resources Information Center

    Taylor, William R.

    The results of an experimental project in American history which introduced to students the methods of historical investigation in specific historical areas through small group research rather than through the college survey course are described in this report. Discussed are (1) the course organization, consisting of two semester units in which…

  8. Computer Applications Project. Phase I. Final Report.

    ERIC Educational Resources Information Center

    Northwest Regional Educational Lab., Portland, OR.

    Phase I of this project for the development of educational materials to teach the use of the computer (1) as an aid to management and decision making, or (2) as an instructional tool, included expansion of background technical reports, completion of computer programs, printing of field test versions of materials, commercial publisher interaction,…

  9. Performance Metrics Research Project - Final Report

    SciTech Connect

    Deru, M.; Torcellini, P.

    2005-10-01

    NREL began work for DOE on this project to standardize the measurement and characterization of building energy performance. NREL's primary research objectives were to determine which performance metrics have greatest value for determining energy performance and to develop standard definitions and methods of measuring and reporting that performance.

  10. Physically Handicapped in Science: Final Project Report.

    ERIC Educational Resources Information Center

    O'Brien, Maureen B.; And Others

    A two-year project was conducted by St. Mary's Junior College to improve the science literacy of visually-impaired students (VIS) through the adaptation of instructional methods and materials. A four-step process was used: (1) learning materials were reviewed to identify problem areas; (2) preliminary adaptations were made based on the review; (3)…

  11. Final Report, SD-265; Project TACT.

    ERIC Educational Resources Information Center

    Air Force Systems Command, L.G. Hanscom Field, MA. Electronic Systems Div.

    The project objective has been to determine what creative thought processes can best take advantage of new technology in computer hardware and software. The plan has been to acquire or develop on-line computer systems of significant mathematical power, and to explore their use in vivo in teaching and research situations. The main product of…

  12. HOSPITALITY EDUCATION CURRICULUM DEVELOPMENT PROJECT. FINAL REPORT.

    ERIC Educational Resources Information Center

    DOMMER, CAROLYN

    THE PURPOSE OF THE PROJECT WAS TO GAIN INFORMATION USEFUL IN DEVELOPING PROGRAMS FOR PREPARING PERSONS FOR EMPLOYMENT IN OCCUPATIONS INVOLVING HOME ECONOMICS KNOWLEDGE AND SKILLS AND FOR PREPARING TEACHERS. THE INITIAL CURRICULUM IN HOSPITALITY EDUCATION, TRAINING IN TRADE AND PERSONAL SERVICE OCCUPATIONS PROVIDING FOOD, LODGING, AND RECREATION,…

  13. ADD Teacher Inservice Project. Final Grant Report.

    ERIC Educational Resources Information Center

    Edwards, Mark C.; Schulz, Eldon G.

    The report describes activities and achievements of the Attention Deficit Disorder (ADD) Teacher Inservice Project. The inservice program was developed using a formal process to identify the critical issues related to ADD awareness, assessment, and intervention. Program content was designed to address critical issues identified in the research…

  14. Workplace Environmental Literacy Project (WELP). Final Report.

    ERIC Educational Resources Information Center

    North Orange County Community Coll. District, Fullerton, CA.

    A project was conducted to determine formal and informal competencies based on an expanded definition of workplace environmental literacy. A secondary goal was to develop a compact between employers and training program graduates whereby graduates would have preferential access to employment opportunities. Issues that arose during the…

  15. Coal Manpower Projections: 1980. Final Report.

    ERIC Educational Resources Information Center

    Clague, Ewan

    The National Petroleum Council has projected a 1980 bituminous coal production of 910 million tons. On that basis, the study estimates the manpower which will be required to produce that volume of coal. On the assumption of a productivity increase of two percent per year from 1974 onwards, the 1980 coal output will require a work force of…

  16. Project Stretch Final Narrative Report. Year III.

    ERIC Educational Resources Information Center

    American Camping Association, Martinsville, IN.

    In June, 1979, the American Camping Association implemented Project STRETCH (Strategies to Try out Resources to Enhance the Training of Camp Directors serving the Handicapped), a nationwide in-service training program for personnel providing services to handicapped children and youth in regularly and specially designed camping and outdoor…

  17. The MICA Project: A Final Look.

    ERIC Educational Resources Information Center

    Roecks, Alan L.

    1979-01-01

    Evaluation of the MICA project (management of instruction with computer assistance) revealed that the supporting software system was efficient and cost-effective, the instruction was adequate, there was no difference in student achievement, and few changes were necessary in order to implement the program. (Author/IRT)

  18. Hartford Labor Mobility Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    Connecticut State Dept. of Public Welfare, Hartford.

    The project was an effort to relocate unemployed and underemployed persons, predominantly Negroes and Puerto Ricans, from the ghetto to the suburbs to learn whether job finding assistance, counseling and relocation could enable families with an able-bodied wage earner to get off welfare rolls. (NTIS)

  19. Minewater heat recovery project. Final Technical report

    SciTech Connect

    1992-04-01

    This report consists of three sections: (1) Design, experimental testing and performance analysis of the 20-ft long DBHE (Downhole Bundle Heat Exchanger); (2) Modified design of mine water heat exchanger; and (3) Performance tests on mine water heat exchanger. Appendices summarize design calculations, discuss the scope of the work tasks, and present a diary of the progress throughout the research and development project.

  20. 21 CFR 1240.61 - Mandatory pasteurization for all milk and milk products in final package form intended for direct...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 8 2014-04-01 2014-04-01 false Mandatory pasteurization for all milk and milk products in final package form intended for direct human consumption. 1240.61 Section 1240.61 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED)...

  1. 21 CFR 1240.61 - Mandatory pasteurization for all milk and milk products in final package form intended for direct...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Mandatory pasteurization for all milk and milk products in final package form intended for direct human consumption. 1240.61 Section 1240.61 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED)...

  2. 21 CFR 1240.61 - Mandatory pasteurization for all milk and milk products in final package form intended for direct...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Mandatory pasteurization for all milk and milk products in final package form intended for direct human consumption. 1240.61 Section 1240.61 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED)...

  3. 21 CFR 1240.61 - Mandatory pasteurization for all milk and milk products in final package form intended for direct...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 8 2013-04-01 2013-04-01 false Mandatory pasteurization for all milk and milk... pasteurization for all milk and milk products in final package form intended for direct human consumption. (a) No... pasteurization are provided for by regulation, such as in part 133 of this chapter for curing of certain...

  4. 21 CFR 1240.61 - Mandatory pasteurization for all milk and milk products in final package form intended for direct...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Mandatory pasteurization for all milk and milk... pasteurization for all milk and milk products in final package form intended for direct human consumption. (a) No... pasteurization are provided for by regulation, such as in part 133 of this chapter for curing of certain...

  5. Final Project Report Project 10749-4.2.2.1 2007-2009

    SciTech Connect

    Zacher, Alan H.; Holladay, Johnathan E.; Frye, J. G.; Brown, Heather M.; Santosa, Daniel M.; Oberg, Aaron A.

    2009-05-11

    This is the final report for the DOE Project 10749-4.2.2.1 for the FY2007 - FY2009 period. This report is non-proprietary, and will be submitted to DOE as a final project report. The report covers activities under the DOE Project inside CRADA 269 (Project 53231) as well as project activites outside of that CRADA (Project 56662). This is the final report that is summarized from the non-proprietary quarterlies submitted to DOE over the past 2.5 years, which in turn are summaries from the proprietary technical reporting to UOP.

  6. DOE Waste Package Project. Quarterly progress report, April 1, 1993--June 30, 1993 and end of year summary report

    SciTech Connect

    Ladkany, S.G.

    1993-08-01

    Contents of this report are as follows: Overview and progress of waste package project and container design; waste container alternate design considerations; structural analysis and design of nuclear waste package canister; manipulation of the nuclear waste container; design requirements of various rock tunnel shapes for long term storage of high level waste; and transport phenomena in the near field.

  7. Klickitat Cogeneration Project : Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration; Klickitat Energy Partners

    1994-09-01

    To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).

  8. Alaska Wood Biomass Energy Project Final Report

    SciTech Connect

    Jonathan Bolling

    2009-03-02

    The purpose of the Craig Wood Fired Boiler Project is to use waste wood from local sawmilling operations to provide heat to local public buildings, in an effort to reduce the cost of operating those buildings, and put to productive use a byproduct from the wood milling process that otherwise presents an expense to local mills. The scope of the project included the acquisition of a wood boiler and the delivery systems to feed wood fuel to it, the construction of a building to house the boiler and delivery systems, and connection of the boiler facility to three buildings that will benefit from heat generated by the boiler: the Craig Aquatic Center, the Craig Elementary School, and the Craig Middle School buildings.

  9. Final performance report for Project JEM

    SciTech Connect

    McKinney, M.J.; Jenkins, S.

    1997-12-31

    Project JEM (Jarvis Enhancement of Males) is a pre-college program directed toward stimulating disadvantaged, talented African American males in grades four, five, and six to attend college and major in mathematics, science, computer science, or related technical areas needed by the US Department of Energy. Twenty young African American male students were recruited from Gladewater Independent School District (ISD), Longview ISD, Hawkins ISD, Tyler ISD, Winona ISD and big Sandy ISD. Students enrolled in the program range from ages 10 to 13 and are in grades four, five and six. Student participants in the 1997 Project JEM Program attended Saturday Academy sessions and a four week intensive, summer residential program. The information here provides a synopsis of the activities which were conducted through each program component.

  10. Operation Dominic. Project Stemwinder. Final report

    SciTech Connect

    Ferber, G.J.

    1985-09-01

    The objective of Project Stemwinder was to probe and sample nuclear clouds as soon as possible after cloud stabilization in order to investigate the amount of radioactive debris which stabilizes in the troposphere and its distribution with height. Sampling was accomplished by the RB-57 aircraft. The detonations investigated were all air bursts over water during Operation Dominic I at Christmas Island. Some data for surface detonations obtained by sampling aircraft during Operation Redwing are used to compare with the Stemwinder data.

  11. Manzanita Hybrid Power system Project Final Report

    SciTech Connect

    Trisha Frank

    2005-03-31

    The Manzanita Indian Reservation is located in southeastern San Diego County, California. The Tribe has long recognized that the Reservation has an abundant wind resource that could be commercially utilized to its benefit, and in 1995 the Tribe established the Manzanita Renewable Energy Office. Through the U.S. Department of Energy's Tribal Energy Program the Band received funds to install a hybrid renewable power system to provide electricity to one of the tribal community buildings, the Manzanita Activities Center (MAC building). The project began September 30, 1999 and was completed March 31, 2005. The system was designed and the equipment supplied by Northern Power Systems, Inc, an engineering company with expertise in renewable hybrid system design and development. Personnel of the National Renewable Energy Laboratory provided technical assistance in system design, and continued to provide technical assistance in system monitoring. The grid-connected renewable hybrid wind/photovoltaic system provides a demonstration of a solar/wind energy hybrid power-generating project on Manzanita Tribal land. During the system design phase, the National Renewable Energy Lab estimated that the wind turbine is expected to produce 10,000-kilowatt hours per year and the solar array 2,000-kilowatt hours per year. The hybrid system was designed to provide approximately 80 percent of the electricity used annually in the MAC building. The project proposed to demonstrate that this kind of a system design would provide highly reliable renewable power for community uses.

  12. Baltimore residential assistance demonstration project: Final report

    SciTech Connect

    1998-09-01

    At the request of the City of Baltimore for assistance in developing the Global Action Plan (GAP) EcoTeam Program, DOE Office of Energy Efficiency and Renewable Energy provided GAP with $10,000 for a one-year demonstration project. The results of this action are as follows: four EcoTeams were established representing 28 households and 47 people; the self reported resource savings to date per household are on average: energy savings--9%, auto emission reduction--16%, solid waste reduction--52%, water savings--25%, dollar savings--$174; the initial seed team (prior to this funding) replicated and started 2 new teams, one of those teams replicated and started 2 more teams, the other team did not replicate; 4 volunteer coaches were recruited to coach each of these teams; a volunteer coordinator was recruited to provide local guidance for this demonstration project and help GAP reach out to the Fairfield low-income neighborhood, the volunteer coordinator was unable to establish any EcoTeams in this neighborhood as their priorities were establishing a neighborhood action team and addressing immediate health-related environmental issues; the volunteers have communicated information about this demonstration project among many community and Baltimore government leaders to solicit support for a full campaign and to assess the level of that support.

  13. The Dust Management Project: Final Report

    NASA Technical Reports Server (NTRS)

    Hyatt, Mark J.; Straka, Sharon

    2011-01-01

    A return to the Moon to extend human presence, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth s economic sphere, will require investment in developing new technologies and capabilities to achieve affordable and sustainable human exploration. From the operational experience gained and lessons learned during the Apollo missions, conducting longterm operations in the lunar environment will be a particular challenge, given the difficulties presented by the unique physical properties and other characteristics of lunar regolith, including dust. The Apollo missions and other lunar explorations have identified significant lunar dust-related problems that will challenge future mission success. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems and human explorers. The Dust Management Project (DMP) is tasked with the evaluation of lunar dust effects, assessment of the resulting risks, and development of mitigation and management strategies and technologies related to Exploration Systems architectures. To this end, the DMP supports the overall goal of the Exploration Technology Development Program (ETDP) of addressing the relevant high priority technology needs of multiple elements within the Constellation Program (CxP) and sister ETDP projects. Project scope, approach, accomplishments, summary of deliverables, and lessons learned are presented.

  14. Fuel Cell Forklift Project Final Report

    SciTech Connect

    Cummings, Clifton C

    2013-10-23

    This project addresses the DOE’s priorities related to acquiring data from real-world fuel cell operation, eliminating non-technical barriers, and increasing opportunities for market expansion of hydrogen fuel cell technologies. The project involves replacing the batteries in a complete fleet of class-1 electric lift trucks at FedEx Freight’s Springfield, MO parcel distribution center with 35 Plug Power GenDrive fuel cell power units. Fuel for the power units involves on-site hydrogen handling and dispensing equipment and liquid hydrogen delivery by Air Products. The project builds on FedEx Freight’s previous field trial experience with a handful of Plug Power’s GenDrive power units. Those trials demonstrated productivity gains and improved performance compared to battery-powered lift trucks. Full lift truck conversion at our Springfield location allows us to improve the competitiveness of our operations and helps the environment by reducing greenhouse gas emissions and toxic battery material use. Success at this distribution center may lead to further fleet conversions at some of our distribution centers.

  15. DOE-EPSCOR SPONSORED PROJECT FINAL REPORT

    SciTech Connect

    Zhu, Jianting

    2010-03-11

    Concern over the quality of environmental management and restoration has motivated the model development for predicting water and solute transport in the vadose zone. Soil hydraulic properties are required inputs to subsurface models of water flow and contaminant transport in the vadose zone. Computer models are now routinely used in research and management to predict the movement of water and solutes into and through the vadose zone of soils. Such models can be used successfully only if reliable estimates of the soil hydraulic parameters are available. The hydraulic parameters considered in this project consist of the saturated hydraulic conductivity and four parameters of the water retention curves. To quantify hydraulic parameters for heterogeneous soils is both difficult and time consuming. The overall objective of this project was to better quantify soil hydraulic parameters which are critical in predicting water flows and contaminant transport in the vadose zone through a comprehensive and quantitative study to predict heterogeneous soil hydraulic properties and the associated uncertainties. Systematic and quantitative consideration of the parametric heterogeneity and uncertainty can properly address and further reduce predictive uncertainty for contamination characterization and environmental restoration at DOE-managed sites. We conducted a comprehensive study to assess soil hydraulic parameter heterogeneity and uncertainty. We have addressed a number of important issues related to the soil hydraulic property characterizations. The main focus centered on new methods to characterize anisotropy of unsaturated hydraulic property typical of layered soil formations, uncertainty updating method, and artificial neural network base pedo-transfer functions to predict hydraulic parameters from easily available data. The work also involved upscaling of hydraulic properties applicable to large scale flow and contaminant transport modeling in the vadose zone and

  16. The Maralinga Rehabilitation Project: final report.

    PubMed

    Parkinson, Alan

    2004-01-01

    Maralinga, South Australia was an important site in the United Kingdom nuclear weapons test programme. Seven bombs were exploded and a series of 'safety' tests carried out; the latter in particular disseminated appreciable amounts of uranium and plutonium over a wide area. A programme to clean up the test site over several years was instituted, with in-situ vitrification as a principal measure. The final report on the programme has now been published. However, both the programme and the Report are seriously flawed; this article provides criticisms of both.

  17. Raft River aquaculture project. Final report

    SciTech Connect

    Beleau, M.H.; Woiwode, J.G.

    1980-07-01

    The commercial potential for geothermal aquaculture was evaluated for 2 years at the Department of Energy's Raft River geothermal site in southcentral Idaho. Common carp '(Cyprinus carpio) and channel catfish (Ictalurus punctatus) were selected as culture species. Objectives of the study included investigation of: (1) growth rates; (2) nutrition trials; (3) histological and physiological parameters; (4) bioaccumulation of heavy metals; and (5) reproductive capacity. The second year project efforts were primarily studying the effects of geothermal water on the reproductive capacity of common carp by: (1) determining the effects of geothermal water on gonadal development of common carp; and (2) determining the effects of geothermal water on common carp embryogenesis.

  18. Cryogenic Barrier Demonstration Project. Final report

    SciTech Connect

    Johnson, L.A.; Yarmak, E.; Long, E.L.

    2000-03-01

    A long-term frozen soil barrier was implemented at the HRE (Homogeneous Reactor Experiment) Pond facility at the Oak Ridge National Laboratory in 1997. This was performed to verify the technical feasibility and costs of deploying a frozen barrier at a radiologically contaminated site. Work began in September 1996 and progressed through to December 1999. The frozen barrier has been operational since November 1997. Verification of the barrier integrity was performed independently by the EPA's SITE Program. This project showed frozen barriers offer a proven technology to retain below grade hazardous substances at relatively low costs with minimal effect on the environment.

  19. Emergency Fish Restoration Project; Final Report 2002.

    SciTech Connect

    LeCaire, Richard

    2003-03-01

    Lake Roosevelt is a 151-mile impoundment created by the construction of Grand Coulee Dam during the early 1940's. The construction of the dam permanently and forever blocked the once abundant anadromous fish runs to the upper Columbia Basin. Since the construction of Grand Coulee Dam in 1943 and Chief Joseph Dam in 1956 this area is known as the blocked area. The blocked area is totally dependant upon resident fish species to provide a subsistence, recreational and sport fishery. The sport fishery of lake Roosevelt is varied but consists mostly of Rainbow trout (Oncorhynchus mykiss), Kokanee salmon (Oncorhynchus nerka), Walleye (Stizostedion vitreum) Small mouth bass (Micropterus dolomieui) and white sturgeon (Acipenser transmontanus). Currently, Bonneville Power Administration funds and administers two trout/kokanee hatcheries on Lake Roosevelt. The Spokane Tribe of Indians operates one hatchery, the Washington Department of Fish and Wildlife the other. In addition to planting fish directly into Lake Roosevelt, these two hatcheries also supply fish to a net pen operation that also plants the lake. The net pen project is administered by Bonneville Power funded personnel but is dependant upon volunteer labor for daily feeding and monitoring operations. This project has demonstrated great success and is endorsed by the Colville Confederated Tribes, the Spokane Tribe of Indians, the Washington Department of Fish and Wildlife, local sportsmen associations, and the Lake Roosevelt Forum. The Lake Roosevelt/Grand Coulee Dam area is widely known and its diverse fishery is targeted by large numbers of anglers annually to catch rainbow trout, kokanee salmon, small mouth bass and walleye. These anglers contribute a great deal to the local economy by fuel, grocery, license, tackle and motel purchases. Because such a large portion of the local economy is dependant upon the Lake Roosevelt fishery and tourism, any unusual operation of the Lake Roosevelt system may have a

  20. Final Report Navajo Transmission Project (NTP)

    SciTech Connect

    Bennie Hoisington; Steven Begay

    2006-09-14

    The Diné Power Authority is developing the Navajo Transmission Project (NTP) to relieve the constraints on the transmission of electricity west of the Four Corners area and to improve the operation flexibility and reliability of the extra-high-voltage transmission system in the region. The NTP creates the wholesale transmission capacity for more economical power transfers, sales, and purchases in the region. It will facilitate the development of Navajo energy resources, improve economic conditions on the Navajo Nation as well as allow DPA to participate in the western electrical utility industry.

  1. Final Report. Montpelier District Energy Project

    SciTech Connect

    Baker, Jessie; Motyka, Kurt; Aja, Joe; Garabedian, Harold T.

    2015-03-30

    The City of Montpelier, in collaboration with the State of Vermont, developed a central heat plant fueled with locally harvested wood-chips and a thermal energy distribution system. The project provides renewable energy to heat a complex of state buildings and a mix of commercial, private and municipal buildings in downtown Montpelier. The State of Vermont operates the central heat plant and the system to heat the connected state buildings. The City of Montpelier accepts energy from the central heat plant and operates a thermal utility to heat buildings in downtown Montpelier which elected to take heat from the system.

  2. Combined Final Report for Colony II Project

    SciTech Connect

    Kale, Laxmikant; Jones, Terry; Moreira, Jose

    2013-10-23

    (This report was originally submmited by the lead PI (Terry Jones, ORNL) on October 22, 2013 to the program manager, Lucy Nowell. It is being submitted from University of Illinois in accordance with instructions). HPC Colony II seeks to provide portable performance for leadership class machines. Our strategy is based on adaptive system software that aims to make the intelligent decisions necessary to allow domain scientists to safely focus on their task at hand and allow the system software stack to adapt their application to the underlying architecture. This report describes the research undertaken towards these objectives and the results obtained over the performance period of the project.

  3. Fairbanks Geothermal Energy Project Final Report

    SciTech Connect

    Karl, Bernie

    2013-05-31

    The primary objective for the Fairbanks Geothermal Energy Project is to provide another source of base-load renewable energy in the Fairbanks North Star Borough (FNSB). To accomplish this, Chena Hot Springs Resort (Chena) drilled a re-injection well to 2700 feet and a production well to 2500 feet. The re-injection well allows a greater flow of water to directly replace the water removed from the warmest fractures in the geothermal reservoir. The new production will provide access to warmer temperature water in greater quantities.

  4. Workplan for tributary refinements to Chesapeake Bay eutrophication model package. Final report

    SciTech Connect

    Cerco, C.F.

    1994-05-01

    The Corps of Engineers, in partnership with the U.S. Environmental Protection Agency Chesapeake Bay Program Office, recently completed a three-dimensional model study of eutrophication in Chesapeake Bay and tributaries. The model package applied included an intratidal hydrodynamic model, an intertidal water-quality model, and a benthic sediment diagenesis model. This report comprises a workplan to improve model representation of Chesapeake Bay tributaries and to incorporate living resources directly into the model framework. Four tributaries have been selected for emphasis under this tributary refinements program. They are the James, York, and Rappahannock rivers, and Baltimore Harbor. The James, York, and Rappahannock were specified because tributary-specific models are required to address water-quality and living-resource benefits to be derived from nutrient reductions. Baltimore Harbor was specified because it presents unique management problems, coupled with long-term toxic impacts, which cannot be addressed in the current model framework. The time scale for the project is 4 years from initiation to completion. Anticipated commencement is April 1, 1994.

  5. Final rapid reactivation project environmental assessment

    SciTech Connect

    1999-02-10

    The US Department of Energy (DOE) has prepared an environmental assessment (EA) for the Rapid Reactivation Project at Sandia National Laboratories, New Mexico. The EA analyzes the potential effects of a proposal to increase production of neutron generators from the current capability of 600 units per year up to 2,000 units per year. The project would use existing buildings and infrastructure to the maximum extent possible to meet the additional production needs. The increased production levels would necessitate modifications and additions involving a total area of approximately 26,290 gross square feet at Sandia National Laboratories, New Mexico, Technical Area 1. Additional production equipment would be procured and installed. The no-action alternative would be to continue production activities at the current capability of 600 units per year. The EA analyzes effects on health, safety, and air quality, resulting from construction and operation and associated cumulative effects. A detailed description of the proposed action and its environmental consequences is presented in the EA.

  6. Project GROW. Final Project Report, January 1989 to June 30, 1989.

    ERIC Educational Resources Information Center

    Jefferson County Public Schools, Louisville, KY.

    This document contains a final project report and curriculum modules from Project GROW, which measured the impact of training on the self-esteem and career awareness of homeless and single parents/displaced homemakers before and after program completion. Project GROW resulted from Project WORTH (Work Opportunity Readiness for the Homeless). The…

  7. First Years Together. Final Project Report. Project Enlightenment.

    ERIC Educational Resources Information Center

    Wake County Public School System, Raleigh, NC.

    First Years Together (FYT), a 3-year service and training demonstration project, provided services to 32 high risk or preterm babies and their parents in order to overcome the emotional and developmental effects of hospitalization and a worrisome start. Service was initiated shortly before each baby's discharge from the intensive care unit and…

  8. Assessment and Improvement of Related Services (AIRS) Project. Final Report.

    ERIC Educational Resources Information Center

    McClelland, Robert A.; Hirata, Glenn T.

    The document presents the final report of the Assessment and Improvement of Related Services (AIRS) Project, an effort to assess the impact and effectiveness of special education related services in Hawaii. Each of the four project objectives focused on accomplishment of one of the evaluation types specified in the Context-Input-Process-Product…

  9. The Service Integration Project. Final Report. A Guide to Collaboration.

    ERIC Educational Resources Information Center

    Fabrizio, Jo J.; Bartel, Joan M.

    Presented is the final report of the Service Integration Project, a North Carolina demonstration project to facilitate collaboration of local programs particularly those sponsored by the Developmental Disabilities program and the Head Start program. Individual chapters deal with the following topics: overview of service integration; the human…

  10. Promoting Learning through Active Interaction. Project PLAI. Final Report.

    ERIC Educational Resources Information Center

    Chen, Deborah; Haney, Michele

    This final report describes the activities and outcomes of Promoting Learning through Active Interactions, a research-to-practice 4-year project that developed, implemented, and validated a five-module curriculum with 25 infants (ages 6-30 months) who are deaf-blind, their parents, and early interventionists. The project had the following…

  11. Student Assistance Program Demonstration Project Evaluation. Final Report.

    ERIC Educational Resources Information Center

    Pollard, John A.; Houle, Denise M.

    This document presents the final report on the evaluation of California's model student assistance program (SAP) demonstration projects implemented in five locations across the state from July 1989 through June 1992. The report provides an overall, integrated review of the evaluation of the SAP demonstration projects, summarizes important findings…

  12. Minnesota Deaf-Blind Technical Assistance Project. Final Report.

    ERIC Educational Resources Information Center

    Kloos, Eric

    This final report describes activities and accomplishments of the 3-year federally supported Minnesota Deaf-Blind Technical Assistance Project. The project provided training and technical assistance, information sharing, and support services to families of children with deaf-blindness. Activities and accomplishments included: collaboration with…

  13. Portage Multi-State Outreach Project. Final Report.

    ERIC Educational Resources Information Center

    Herwig, Julia; Herman, Patti

    This final report of the Portage Multi-State Outreach Project discusses the project's activities in assisting states, agencies, and local programs to plan, develop, and provide services for unserved and underserved young children with disabilities and their families across a variety of settings and program options. Specifically the project…

  14. Library Literacy Program Project. Final Financial Status and Performance Report.

    ERIC Educational Resources Information Center

    Martin, Anna L.

    The final financial status and performance report for a library literacy program project at the Yuma City-County Library (Arizona) begins with a brief statement of general information about the grant. This is followed by a narrative report that delineates the goal of the project--for the library to take a leadership role in developing,…

  15. Science and Engineering Technician Curriculum Development Project. Final Report.

    ERIC Educational Resources Information Center

    Mowery, Donald R.; Wolf, Lawrence J.

    Project SET (Science and Engineering for Technicians) developed a series of study guides designed to teach generic science and engineering skills to students interested in becoming technicians. An entire 2-year curriculum is encompassed by these guides, geared for 2-year college students. Described in this final report are the project's rationale,…

  16. Advanced Blade Manufacturing Project - Final Report

    SciTech Connect

    POORE, ROBERT Z.

    1999-08-01

    The original scope of the project was to research improvements to the processes and materials used in the manufacture of wood-epoxy blades, conduct tests to qualify any new material or processes for use in blade design and subsequently build and test six blades using the improved processes and materials. In particular, ABM was interested in reducing blade cost and improving quality. In addition, ABM needed to find a replacement material for the mature Douglas fir used in the manufacturing process. The use of mature Douglas fir is commercially unacceptable because of its limited supply and environmental concerns associated with the use of mature timber. Unfortunately, the bankruptcy of FloWind in June 1997 and a dramatic reduction in AWT sales made it impossible for ABM to complete the full scope of work. However, sufficient research and testing were completed to identify several promising changes in the blade manufacturing process and develop a preliminary design incorporating these changes.

  17. Physics of Correlated Systems, Final Project Report

    SciTech Connect

    Greene, Chris H.

    2014-06-25

    The funding of this DOE project has enabled the P.I. and his collaborators to tackle a number of problems involving nonperturbatively coupled atomic systems, including their interactions with each other and/or with an external electromagnetic field of the type provided by either a continuous-wave or a femtosecond short-pulse laser. The progress includes a new, deeper understanding of an old and famous theory of autoionization lineshapes, developed initially by Ugo Fano in 1935 and later extended in a highly cited 1961 article; the new result specifically is that in a collaboration with the Heidelberg group we have been able to demonstrate an unexpectedly simple behavior in the time domain that is relevant for modern short-pulse lasers. This study also demonstrates a way to modify and even control the lineshapes of unstable atomic and molecular energy levels.

  18. Yakima Fisheries Project : Final Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration; Washington . Dept. of Fish and Wildlife; Confederated Tribes and Bands of the Yakama Nation, Washington.

    1996-01-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. These activities, known as the Yakima Fisheries Project (YFP), would be jointly managed by the State of Washington and the Yakima Indian Nation. The YFP is included in the Northwest Power Planning Council`s (Council`s) fish and wildlife program. The Council selected the Yakima River system for attention because fisheries resources are severely reduced from historical levels and because there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) die construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. Examined in addition to No Action are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of reestablishing naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 is the preferred action. A central hatchery would be built for either alternative, as well as three sites with six raceways each for acclimation and release of spring chinook smolts. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

  19. MEMS scanning laser projection based on high-Q vacuum packaged 2D-resonators

    NASA Astrophysics Data System (ADS)

    Hofmann, U.; Eisermann, C.; Quenzer, H.-J.; Janes, J.; Schroeder, C.; Schwarzelbach, O.; Jensen, B.; Ratzmann, L.; Giese, T.; Senger, F.; Hagge, J.; Weiss, M.; Wagner, B.; Benecke, W.

    2011-03-01

    Small size, low power consumption and the capability to produce sharp images without need of an objective make MEMS scanning laser based pico-projectors an attractive solution for embedded cell-phone projection displays. To fulfil the high image resolution demands the MEMS scanning mirror has to show large scan angles, a large mirror aperture size and a high scan frequency. An additional important requirement in pico-projector applications is to minimize power consumption of the MEMS scanner to enable a long video projection time. Typically high losses in power are caused by gas damping. For that reason Fraunhofer ISIT has established a fabrication process for 2D-MEMS mirrors that includes vacuum encapsulation on 8-inch wafers. Quality factors as high as 145,000 require dedicated closed loop phase control electronics to enable stable image projection even at rapidly changing laser intensities. A capacitive feedback signal is the basis for controlling the 2D MEMS oscillation and for synchronising the laser sources. This paper reports on fabrication of two-axis wafer level vacuum packaged scanning micromirrors and its use in a compact laser projection display. The paper presents different approaches of overcoming the well-known reflex problem of packaged MEMS scanning mirrors.

  20. Wafer-level vacuum packaged resonant micro-scanning mirrors for compact laser projection displays

    NASA Astrophysics Data System (ADS)

    Hofmann, Ulrich; Oldsen, Marten; Quenzer, Hans-Joachim; Janes, Joachim; Heller, Martin; Weiss, Manfred; Fakas, Georgios; Ratzmann, Lars; Marchetti, Eleonora; D'Ascoli, Francesco; Melani, Massimiliano; Bacciarelli, Luca; Volpi, Emilio; Battini, Francesco; Mostardini, Luca; Sechi, Francesco; De Marinis, Marco; Wagner, Bernd

    2008-02-01

    Scanning laser projection using resonant actuated MEMS scanning mirrors is expected to overcome the current limitation of small display size of mobile devices like cell phones, digital cameras and PDAs. Recent progress in the development of compact modulated RGB laser sources enables to set up very small laser projection systems that become attractive not only for consumer products but also for automotive applications like head-up and dash-board displays. Within the last years continuous progress was made in increasing MEMS scanner performance. However, only little is reported on how mass-produceability of these devices and stable functionality even under harsh environmental conditions can be guaranteed. Automotive application requires stable MEMS scanner operation over a wide temperature range from -40° to +85°Celsius. Therefore, hermetic packaging of electrostatically actuated MEMS scanning mirrors becomes essential to protect the sensitive device against particle contamination and condensing moisture. This paper reports on design, fabrication and test of a resonant actuated two-dimensional micro scanning mirror that is hermetically sealed on wafer level. With resonant frequencies of 30kHz and 1kHz, an achievable Theta-D-product of 13mm.deg and low dynamic deformation <20nm RMS it targets Lissajous projection with SVGA-resolution. Inevitable reflexes at the vacuum package surface can be seperated from the projection field by permanent inclination of the micromirror.

  1. Child-resistant packaging for certain over-the-counter drug products. Final rule.

    PubMed

    2001-08-01

    Pursuant to its 3-0 vote to do so, the Consumer Product Safety Commission (CPSC or Commission) is issuing a rule to require child-resistant (CR) packaging on drugs (OTC switched drugs) approved by the Food and Drug Administration (FDA) for over-the-counter (OTC) sale that contain active ingredients previously available only in prescription drugs. Current Commission regulations require CR packaging for most oral drug products containing prescription-only active ingredients.However, prior to issuance of this rule there was no general requirement to maintain CR packaging of such drug products in forms subsequently approved by the FDA for OTC sale. The Commission is also revoking the current prohibition on granting a petition for an exemption from a CR packaging requirement prior to FDA approval of the drug product in question. The Commission takes these actions under authority of the Poison Prevention Packaging Act of 1970, as amended.

  2. WSF Biodiesel Demonstration Project Final Report

    SciTech Connect

    Washington State University; University of Idaho; The Glosten Associates, Inc.; Imperium Renewables, Inc.

    2009-04-30

    In 2004, WSF canceled a biodiesel fuel test because of “product quality issues” that caused the fuel purifiers to clog. The cancelation of this test and the poor results negatively impacted the use of biodiesel in marine application in the Pacific Northwest. In 2006, The U.S. Department of Energy awarded the Puget Sound Clean Air Agency a grant to manage a scientific study investigating appropriate fuel specifications for biodiesel, fuel handling procedures and to conduct a fuel test using biodiesel fuels in WSF operations. The Agency put together a project team comprised of experts in fields of biodiesel research and analysis, biodiesel production, marine engineering and WSF personnel. The team reviewed biodiesel technical papers, reviewed the 2004 fuel test results, designed a fuel test plan and provided technical assistance during the test. The research reviewed the available information on the 2004 fuel test and conducted mock laboratory experiments, but was not able to determine why the fuel filters clogged. The team then conducted a literature review and designed a fuel test plan. The team implemented a controlled introduction of biodiesel fuels to the test vessels while monitoring the environmental conditions on the vessels and checking fuel quality throughout the fuel distribution system. The fuel test was conducted on the same three vessels that participated in the canceled 2004 test using the same ferry routes. Each vessel used biodiesel produced from a different feedstock (i.e. soy, canola and yellow grease). The vessels all ran on ultra low sulfur diesel blended with biodiesel. The percentage of biodiesel was incrementally raised form from 5 to 20 percent. Once the vessels reached the 20 percent level, they continued at this blend ratio for the remainder of the test. Fuel samples were taken from the fuel manufacturer, during fueling operations and at several points onboard each vessel. WSF Engineers monitored the performance of the fuel systems and

  3. HIP densification project. Final CRADA report

    SciTech Connect

    Franco-Ferreira, E.A.; Finkelstein, W.

    1997-08-29

    An investigation was conducted to evaluate the use of HIPed aluminum castings as near-net-shape blanks for large electrostatic focusing electrodes in ion lithography machines. The electrodes must have very smooth finishes which are free of pores and other defects. This has heretofore been achieved by rough-machining the blanks out of large forged aluminum billets and final diamond-turning. The use of a near-net-shape casting for the blank was expected to save a significant amount of money and time. The test was conducted on a single cast blank which was supplied by the Partner in the HIPed and stress relieved condition. Rough machining and diamond turning operations conducted by LMES/ER revealed that the casting contained unacceptably large defects. The conclusion was reached that HIPed aluminum castings in the large sizes and of the quality levels required would probably be unobtainable in a cost-effective manner. An alternative approach, using ring forgings assembled by electron beam welding was proposed and investigated by LMES/ER. Although an electrode blank was not obtained, the study indicated that this approach would be successful and cost-effective.

  4. Salton Sea Project: Phase 1. Final report

    SciTech Connect

    Peelgren, M.L.

    1982-01-15

    A feasibility study was made for a salt gradient solar pond power plant in or near the Salton Sea of California. The conclusions are very supportive of continuing the project into the next phase; design and construction of a 5-MWe proof-of-concept experiment, and ultimate construction by an electric utility company of a 600-MWe plant. The Solar Pond concept will provide an environmental benefit to the Salton Sea by reversing the increasing salinity trend that, if unchecked, will eventually kill all life in the sea. The greatest cost drivers determined for the 5-MWe plant are the lake dike construction and pond sealing. Problems remaining to be resolved include method of brine production from Salton Sea water for the first unit (which will require evaporation pond area and time), the high turbidity and color content of the Salton Sea water (which will require pre-treatment), and other questions related to pond permeability, bio-activity and soil/brine chemical reactions. All technical and environmental problems appear solvable and/or manageable if care is taken in mitigating impacts.

  5. Baltimore Zoo digester project. Final report. [Elephants

    SciTech Connect

    Gibson, P.W.

    1980-01-01

    The results of a project to produce methane using the manure from zoo animals as a feedstock is presented. Two digesters are in operation, the first (built in 1974) utilizing wastes from the Hippo House and a second (built in 1980) utilizing wastes from the Elephant House. Demonstrations on the utilization of the gas were performed during zoo exhibits. The Elephant House Digester has a capacity of 4200 gallons and a floating gas dome which can retain at least 150 cu ft of gas. Solar energy has been incorporated into the design to maintain digester temperature at 95/sup 0/F. The system produces 50 cu ft per day. After cleaning the gas, it is used to generate electricity to power an electric light, a roof fan, and an air conditioner. The gas is also used to operate a gas range and a gas lamp. During the opening day exhibit, 50 meals were cooked using the bio-gas from just 2 elephants. (DMC)

  6. Helical Screw Expander Evaluation Project. Final report

    SciTech Connect

    McKay, R.

    1982-03-01

    A functional 1-MW geothermal electric power plant that featured a helical screw expander was produced and then tested in Utah in 1978 to 1979 with a demonstrated average performance of approximately 45% machine efficiency over a wide range of test conditions in noncondensing operation on two-phase geothermal fluids. The Project also produced a computer-equipped data system, an instrumentation and control van, and a 1000-kW variable load bank, all integrated into a test array designed for operation at a variety of remote test sites. Additional testing was performed in Mexico in 1980 under a cooperative test program using the same test array, and machine efficiency was measured at 62% maximum with the rotors partially coated with scale, compared with approximately 54% maximum in Utah with uncoated rotors, confirming the importance of scale deposits within the machine on performance. Data are presented for the Utah testing and for the noncondensing phases of the testing in Mexico. Test time logged was 437 hours during the Utah tests and 1101 hours during the Mexico tests.

  7. Aerogel commercialization pilot project. Final program report

    SciTech Connect

    1996-02-13

    Aerogels are extremely light weight, high surface area, very insulative materials that offer many potential improvements to commercial products. Aerogels have been the subject of extensive research at Department of Energy Laboratories and have been considered one of the technology most ready for commercialization. However, commercialization of the technology had been difficult for the National Laboratories since end users were not interested in the high temperature and high pressure chemical processes involved in manufacturing the raw material. Whereas, Aerojet as a supplier of rocket fuels, specialty chemicals and materials had the manufacturing facilities and experience to commercially produce aerogel-type products. Hence the TRP provided a link between the technology source (National Laboratories), the manufacturing (Aerojet) and the potential end users (other TRP partners). The program successfully produced approximately 500 ft{sup 2} of organic aerogel but failed to make significant quantities of silica aerogel. It is significant that this production represents both the largest volume and biggest pieces of organic aerogel ever produced. Aerogels, available from this program, when tested in several prototype commercial products were expected to improve the products performance, but higher than expected projected production costs for large scale manufacture of aerogels has limited continued commercial interest from these partners. Aerogels do, however, offer potential as a specialty material for some high value technology and defense products.

  8. SMAP Verification and Validation Project - Final Report

    NASA Technical Reports Server (NTRS)

    Murry, Michael

    2012-01-01

    In 2007, the National Research Council (NRC) released the Decadal Survey of Earth science. In the future decade, the survey identified 15 new space missions of significant scientific and application value for the National Aeronautics and Space Administration (NASA) to undertake. One of these missions was the Soil Moisture Active Passive (SMAP) mission that NASA assigned to the Jet Propulsion Laboratory (JPL) in 2008. The goal of SMAP1 is to provide global, high resolution mapping of soil moisture and its freeze/thaw states. The SMAP project recently passed its Critical Design Review and is proceeding with its fabrication and testing phase.Verification and Validation (V&V) is widely recognized as a critical component in system engineering and is vital to the success of any space mission. V&V is a process that is used to check that a system meets its design requirements and specifications in order to fulfill its intended purpose. Verification often refers to the question "Have we built the system right?" whereas Validation asks "Have we built the right system?" Currently the SMAP V&V team is verifying design requirements through inspection, demonstration, analysis, or testing. An example of the SMAP V&V process is the verification of the antenna pointing accuracy with mathematical models since it is not possible to provide the appropriate micro-gravity environment for testing the antenna on Earth before launch.

  9. Innovative subsurface stabilization project -- Final Report

    SciTech Connect

    Loomis, G.G.; Zdinak, A.P.; Bishop, C.W.

    1996-11-01

    This is a report of results of applying four innovative grouting materials and one commercially available material for creating monoliths out of buried waste sites using jet grouting. The four innovative materials included a proprietary water-based epoxy, an Idaho National Engineering Laboratory-developed two-component grout that resembles hematite when cured with soil, molten low-temperature paraffin, and a proprietary iron oxide cement-based grout called TECT. The commercial grout was Type-H high-sulfate-resistant cement. These materials were tested in specially designed cold test pits that simulate buried transuranic waste at the Idaho National Engineering Laboratory. In addition to the grouting studies, specially designed field-scale permeameters were constructed to perform full-scale controlled mass balance hydraulic conductivity studies. An ungrouted field-scale permeameter contained simulated buried waste and soil and was left ungrouted, and a second identical field-scale permeameter was grouted with commercial-grade Type-H cement. The field demonstrations were performed in an area referred to as the Cold Test Pit at the Idaho National Engineering Laboratory. The Cold Test Pit is adjacent to the laboratory`s Radioactive Waste Management Complex. At the complex, 2 million ft{sup 3} of transuranic waste is commingled with 6--8 million ft{sup 3} of soil in shallow land burial, and improving the confinement of this waste is one of the options for final waste disposition. This report gives results of grouting, coring, hydraulic conductivity, and destructive examination of the grouted buried waste matrix.

  10. Colorado Better Buildings Project Final Report

    SciTech Connect

    Strife, Susie; Yancey, Lea

    2013-12-30

    The Colorado Better Buildings project intended to bring new and existing energy efficiency model programs to market with regional collaboration and funding partnerships. The goals for Boulder County and its program partners were to advance energy efficiency investments, stimulate economic growth in Colorado and advance the state’s energy independence. Collectively, three counties set out to complete 9,025 energy efficiency upgrades in 2.5 years and they succeeded in doing so. Energy efficiency upgrades have been completed in more than 11,000 homes and businesses in these communities. Boulder County and its partners received a $25 million BetterBuildings grant from the U.S. Department of Energy under the American Recovery and Reinvestment Act in the summer of 2010. This was also known as the Energy Efficiency and Conservation Block Grants program. With this funding, Boulder County, the City and County of Denver, and Garfield County set out to design programs for the residential and commercial sectors to overcome key barriers in the energy upgrade process. Since January 2011, these communities have paired homeowners and business owners with an Energy Advisor – an expert to help move from assessment to upgrade with minimal hassle. Pairing this step-by-step assistance with financing incentives has effectively addressed many key barriers, resulting in energy efficiency improvements and happy customers. An expert energy advisor guides the building owner through every step of the process, coordinating the energy assessment, interpreting results for a customized action plan, providing a list of contractors, and finding and applying for all available rebates and low-interest loans. In addition to the expert advising and financial incentives, the programs also included elements of social marketing, technical assistance, workforce development and contractor trainings, project monitoring and verification, and a cloud-based customer data system to coordinate among field

  11. Final Technical Report. Project Boeing SGS

    SciTech Connect

    Bell, Thomas E.

    2014-12-31

    Boeing and its partner, PJM Interconnection, teamed to bring advanced “defense-grade” technologies for cyber security to the US regional power grid through demonstration in PJM’s energy management environment. Under this cooperative project with the Department of Energy, Boeing and PJM have developed and demonstrated a host of technologies specifically tailored to the needs of PJM and the electric sector as a whole. The team has demonstrated to the energy industry a combination of processes, techniques and technologies that have been successfully implemented in the commercial, defense, and intelligence communities to identify, mitigate and continuously monitor the cyber security of critical systems. Guided by the results of a Cyber Security Risk-Based Assessment completed in Phase I, the Boeing-PJM team has completed multiple iterations through the Phase II Development and Phase III Deployment phases. Multiple cyber security solutions have been completed across a variety of controls including: Application Security, Enhanced Malware Detection, Security Incident and Event Management (SIEM) Optimization, Continuous Vulnerability Monitoring, SCADA Monitoring/Intrusion Detection, Operational Resiliency, Cyber Range simulations and hands on cyber security personnel training. All of the developed and demonstrated solutions are suitable for replication across the electric sector and/or the energy sector as a whole. Benefits identified include; Improved malware and intrusion detection capability on critical SCADA networks including behavioral-based alerts resulting in improved zero-day threat protection; Improved Security Incident and Event Management system resulting in better threat visibility, thus increasing the likelihood of detecting a serious event; Improved malware detection and zero-day threat response capability; Improved ability to systematically evaluate and secure in house and vendor sourced software applications; Improved ability to continuously monitor

  12. FINAL REPORT FOR THE DIII-D RADIATIVE DIVERTOR PROJECT

    SciTech Connect

    O'NEIL, RC; STAMBAUGH, RD

    2002-06-01

    OAK A271 FINAL REPORT FOR THE DIII-D RADIATIVE DIVERTOR PROJECT. The Radiative Divertor Project originated in 1993 when the DIII-D Five Year Plan for the period 1994--1998 was prepared. The Project Information Sheet described the objective of the project as ''to demonstrate dispersal of divertor power by a factor of then with sufficient diagnostics and modeling to extend the results to ITER and TPX''. Key divertor components identified were: (1) Carbon-carbon and graphite armor tiles; (2) The divertor structure providing a gas baffle and cooling; and (3) The divertor cryopumps to pump fuel and impurities.

  13. Self-Correcting HVAC Controls Project Final Report

    SciTech Connect

    Fernandez, Nicholas; Brambley, Michael R.; Katipamula, Srinivas; Cho, Heejin; Goddard, James K.; Dinh, Liem H.

    2010-01-04

    This document represents the final project report for the Self-Correcting Heating, Ventilating and Air-Conditioning (HVAC) Controls Project jointly funded by Bonneville Power Administration (BPA) and the U.S. Department of Energy (DOE) Building Technologies Program (BTP). The project, initiated in October 2008, focused on exploratory initial development of self-correcting controls for selected HVAC components in air handlers. This report, along with the companion report documenting the algorithms developed, Self-Correcting HVAC Controls: Algorithms for Sensors and Dampers in Air-Handling Units (Fernandez et al. 2009), document the work performed and results of this project.

  14. Tritium research laboratory cleanup and transition project final report

    SciTech Connect

    Johnson, A.J.

    1997-02-01

    This Tritium Research Laboratory Cleanup and Transition Project Final Report provides a high-level summary of this project`s multidimensional accomplishments. Throughout this report references are provided for in-depth information concerning the various topical areas. Project related records also offer solutions to many of the technical and or administrative challenges that such a cleanup effort requires. These documents and the experience obtained during this effort are valuable resources to the DOE, which has more than 1200 other process contaminated facilities awaiting cleanup and reapplication or demolition.

  15. DOE Waste Package Project. Quarterly progress report, October 1, 1993--December 31, 1993

    SciTech Connect

    Ladkany, S.G.

    1993-12-31

    The Waste Package Project research activities continued in all research areas. The areas include: Container structural and stress analysis; Nuclear fission criticality studies; Investigation of canister design concepts and corrosion studies; Heat transfer studies; Fluid flow in porous media and radionuclide transport in near field rock; Studies of stresses and stability of the rock formations resulting from the thermal loading of the fuel elements and the multi tunnel concept being analyzed; Characterization of a Faulted Rock Tunnel Model Using Photoelastic and Finite Element Studies; Experiment studies of the dynamic response of a flexible three-link robot using strain gages and Lagrange polynomials; and Robotic manipulation of the nuclear waste container.

  16. Properties of polystrene bead foam as an encapsulant for electronic packages. Final report

    SciTech Connect

    Fossey, D.J.

    1981-04-01

    Polystyrene bead foam (PSBF) was evaluated as an encapsulant for electronic packages. Various properties of PSBF pertinent to the expected environmental conditioning of a prototype electronic package were determined and evaluated for their effects on individual electronic components, within the package. It was determined that PSBF densities of 0.2 to 0.4 g/cm/sup 3/ provided adequate protection without damaging fragile electronic components. PSBF densities above 0.4 g/cm/sup 3/ provide adequate protection from the shock and vibration spectra evaluated, but could damage fragile electronic components during the encapsulation process and thermal cycling. Buildup of electrostatic voltage during encapsulation can be reduced to safe levels by grounding the case of the electronic package. Only the 0.6 g/cm/sup 3/ PSBF could be made impervious to moisture penetration.

  17. Petascale Computing Enabling Technologies Project Final Report

    SciTech Connect

    de Supinski, B R

    2010-02-14

    The Petascale Computing Enabling Technologies (PCET) project addressed challenges arising from current trends in computer architecture that will lead to large-scale systems with many more nodes, each of which uses multicore chips. These factors will soon lead to systems that have over one million processors. Also, the use of multicore chips will lead to less memory and less memory bandwidth per core. We need fundamentally new algorithmic approaches to cope with these memory constraints and the huge number of processors. Further, correct, efficient code development is difficult even with the number of processors in current systems; more processors will only make it harder. The goal of PCET was to overcome these challenges by developing the computer science and mathematical underpinnings needed to realize the full potential of our future large-scale systems. Our research results will significantly increase the scientific output obtained from LLNL large-scale computing resources by improving application scientist productivity and system utilization. Our successes include scalable mathematical algorithms that adapt to these emerging architecture trends and through code correctness and performance methodologies that automate critical aspects of application development as well as the foundations for application-level fault tolerance techniques. PCET's scope encompassed several research thrusts in computer science and mathematics: code correctness and performance methodologies, scalable mathematics algorithms appropriate for multicore systems, and application-level fault tolerance techniques. Due to funding limitations, we focused primarily on the first three thrusts although our work also lays the foundation for the needed advances in fault tolerance. In the area of scalable mathematics algorithms, our preliminary work established that OpenMP performance of the AMG linear solver benchmark and important individual kernels on Atlas did not match the predictions of our

  18. Reliability of CGA/LGA/HDI Package Board/Assembly (Final Report)

    NASA Technical Reports Server (NTRS)

    Ghaffaroam. Reza

    2014-01-01

    Package manufacturers are now offering commercial-off-the-shelf column grid array (COTS CGA) packaging technologies in high-reliability versions. Understanding the process and quality assurance (QA) indicators for reliability are important for low-risk insertion of these advanced electronics packages. The previous reports, released in January of 2012 and January of 2013, presented package test data, assembly information, and reliability evaluation by thermal cycling for CGA packages with 1752, 1517, 1509, and 1272 inputs/outputs (I/Os) and 1-mm pitch. It presented the thermal cycling (-55C either 100C or 125C) test results for up to 200 cycles. This report presents up to 500 thermal cycles with quality assurance and failure analysis evaluation represented by optical photomicrographs, 2D real time X-ray images, dye-and-pry photomicrographs, and optical/scanning electron Microscopy (SEM) cross-sectional images. The report also presents assembly challenge using reflowing by either vapor phase or rework station of CGA and land grid array (LGA) versions of three high I/O packages both ceramic and plastic configuration. A new test vehicle was designed having high density interconnect (HDI) printed circuit board (PCB) with microvia-in-pad to accommodate both LGA packages as well as a large number of fine pitch ball grid arrays (BGAs). The LGAs either were assembled onto HDI PCB as an LGA or were solder paste print and reflow first to form solder dome on pads before assembly. Both plastic BGAs with 1156 I/O and ceramic LGAs were assembled. It also presented the X-ray inspection results as well as failures due to 200 thermal cycles. Lessons learned on assembly of ceramic LGAs are also presented.

  19. The Skills Enhancement Literacy Project of Hawaii. Final Program Model. Final Performance Report. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Hawaii Univ., Manoa. Coll. of Education.

    The Skills Enhancement Literacy Project of Hawaii (SELPH) was a demonstration workplace literacy partnership between the College of Education, University of Hawaii-Manoa and the ITT Sheraton Hotels. Four Sheraton Hotels in Waikiki participated in the project. The program was planned, staff and volunteers were recruited, and marketing strategies…

  20. Final year engineering projects in Australia and Europe

    NASA Astrophysics Data System (ADS)

    Ku, H.; Goh, S.

    2010-05-01

    The paper starts by emphasising that final year engineering projects are regarded important in the training and education of professional engineers in Australia and Europe. The sources of projects available to students were also mentioned. Some Australian universities insist on individual projects but some not, each with their own reasons. However, it can be argued that all European universities run individual projects. In most cases, whether it is in Australia or Europe, the total load for final year engineering projects is about 6.25% of the load of engineering programmes. Assessment methods were also described. They were all different whether in Australia or Europe but not very significant. It was discovered that literature reviews, oral presentations and written reports or dissertations were important elements in the assessment schemes. Many university staff, in both continents, encouraged students to publish their work in international conferences and journals if the originality of the projects was high. It can be argued that the individual project is most effective in learning outcome; however, the cost involved is also very high and its sustainability in smaller universities in Australia is in doubt.

  1. Learning in Science Project (Form 1-4). Final Report.

    ERIC Educational Resources Information Center

    Waikato Univ., Hamilton (New Zealand).

    The Learning in Science Project investigated teaching and learning in science at the Form 1 to 4 level to identify some of the key difficulties in this subject area and to find ways of overcoming such difficulties. Included in this final report are: (1) brief accounts of the three major phases of the research; (2) a list of papers derived from the…

  2. National Traffic Safety Documentation Center Project Definition Study. Final Report.

    ERIC Educational Resources Information Center

    System Development Corp., Falls Church, VA.

    A project definition study was conducted for the development, implementation and operation of a National Traffic Safety Documentation Center. Included in this final comprehensive report are: (1) the results of nationwide surveys of users and sources of traffic safety information; (2) a review of relevant information technology in terms of the…

  3. Human Relations Training for Educators. Final Evaluation. Project Upper Cumberland.

    ERIC Educational Resources Information Center

    Khanna, J. L.

    Project Upper Cumberland was a three year endeavor which served 16 Tennessee counties. The final report and evaluation, in three documents, summarizes the three innovative programs which it engendered: (1) teacher inservice training, emphasizing human relations; (2) a pilot cultural arts program (art, music, drama) for grades 1-12; and (3) a pilot…

  4. Leading Curriculum Innovation in Primary Schools Project: A Final Report

    ERIC Educational Resources Information Center

    Brundrett, Mark; Duncan, Diane

    2015-01-01

    This article provides the final report on a research project that investigated the ways in which curriculum innovation can be led successfully in primary schools. Data gathering included 40 semi-structured interviews in 10 successful primary schools in England of varying sizes and types and in a range of geographical and social locations. Findings…

  5. Tom Green County Library Literacy Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Vavricka, D. Karen

    The final report of the Tom Green Country Library System (Texas) literacy project details progress toward achievement of 11 objectives. Objectives of the literacy outreach program were to: (1) increase Hispanic enrollment; (2) increase Black enrollment; (3) provide free child care for 4 students to attend 50 tutoring sessions; (4) provide…

  6. Final-Year Education Projects for Undergraduate Chemistry Students

    ERIC Educational Resources Information Center

    Page, Elizabeth

    2011-01-01

    The Undergraduate Ambassadors Scheme provides an opportunity for students in their final year of the chemistry degree course at the University of Reading to choose an educational project as an alternative to practical research. The undergraduates work in schools where they can be regarded as role models and offer one way of inspiring pupils to…

  7. Admiralty Inlet Pilot Tidal Project Final Technical Report

    SciTech Connect

    Collar, Craig

    2015-09-14

    This document represents the final report for the Admiralty Inlet Pilot Tidal Project, located in Puget Sound, Washington, United States. The Project purpose was to license, permit, and install a grid-connected deep-water tidal turbine array (two turbines) to be used as a platform to gather operational and environmental data on tidal energy generation. The data could then be used to better inform the viability of commercial tidal energy generation from technical, economic, social, and environmental standpoints. This data would serve as a critical step towards the responsible advancement of commercial scale tidal energy in the United States and around the world. In late 2014, Project activities were discontinued due to escalating costs, and the DOE award was terminated in early 2015. Permitting, licensing, and engineering design activities were completed under this award. Final design, deployment, operation, and monitoring were not completed. This report discusses the results and accomplishments achieved under the subject award.

  8. Plasma diagnostics package. Volume 2: Spacelab 2 section. Part B: Thesis projects

    NASA Technical Reports Server (NTRS)

    Pickett, Jolene S. (Compiler); Frank, L. A. (Compiler); Kurth, W. S. (Compiler)

    1988-01-01

    This volume (2), which consists of two parts (A and B), of the Plasma Diagnostics Package (PDP) Final Science Report contains a summary of all of the data reduction and scientific analyses which were performed using PDP data obtained on STS-51F as a part of the Spacelab 2 (SL-2) payload. This work was performed during the period of launch, July 29, 1985, through June 30, 1988. During this period the primary data reduction effort consisted of processing summary plots of the data received by 12 of the 14 instruments located on the PDP and submitting these data to the National Space Science Data Center (NSSDC). Three Master's and three Ph.D. theses were written using PDP instrumentation data. These theses are listed in Volume 2, Part B.

  9. Canister Cleaning System Final Design Report Project A-2A

    SciTech Connect

    FARWICK, C.C.

    2000-06-15

    Approximately 2,300 metric tons Spent Nuclear Fuel (SNF) are currently stored within two water filled pools, the 105 K East (KE) fuel storage basin and the 105 K West (KW) fuel storage basin, at the U.S. Department of Energy, Richland Operations Office (RL). The SNF Project is responsible for operation of the K Basins and for the materials within them. A subproject to the SNF Project is the Debris Removal Subproject, which is responsible for removal of empty canisters and lids from the basins. The Canister Cleaning System (CCS) is part of the Debris Removal Project. The CCS will be installed in the KW Basin and operated during the fuel removal activity. The KW Basin has approximately 3600 canisters that require removal from the basin. The CCS is being designed to ''clean'' empty fuel canisters and lids and package them for disposal to the Environmental Restoration Disposal Facility complex. The system will interface with the KW Basin and be located in the Dummy Elevator Pit.

  10. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    SciTech Connect

    GREAGER, T.M.

    2000-12-06

    The Quality Assurance Project Plan (QAPjP) has been prepared for waste characterization activities to be conducted by the Transuranic (TRU) Project at the Hanford Site to meet requirements set forth in the Waste Isolation Pilot Plan (WIPP) Hazardous Waste Facility Permit, 4890139088-TSDF, Attachment B, including Attachments B1 through B6 (WAP) (DOE, 1999a). The QAPjP describes the waste characterization requirements and includes test methods, details of planned waste sampling and analysis, and a description of the waste characterization and verification process. In addition, the QAPjP includes a description of the quality assurance/quality control (QA/QC) requirements for the waste characterization program. Before TRU waste is shipped to the WIPP site by the TRU Project, all applicable requirements of the QAPjP shall be implemented. Additional requirements necessary for transportation to waste disposal at WIPP can be found in the ''Quality Assurance Program Document'' (DOE 1999b) and HNF-2600, ''Hanford Site Transuranic Waste Certification Plan.'' TRU mixed waste contains both TRU radioactive and hazardous components, as defined in the WLPP-WAP. The waste is designated and separately packaged as either contact-handled (CH) or remote-handled (RH), based on the radiological dose rate at the surface of the waste container. RH TRU wastes are not currently shipped to the WIPP facility.

  11. FINAL REPORT FOR MOISTURE EFFECTS ON COMPACTION OF FIBERBOARD IN A 9975 SHIPPING PACKAGE

    SciTech Connect

    Stefek, T.; Daugherty, W.; Estochen, E.

    2013-09-17

    Compaction of lower layers in the fiberboard assembly has been observed in 9975 packages that contain elevated moisture. Lab testing has resulted in a better understanding of the relationship between the fiberboard moisture level and compaction of the lower fiberboard assembly, and the behavior of the fiberboard during transport. In laboratory tests of cane fiberboard, higher moisture content has been shown to correspond to higher total compaction, greater rate of compaction, and continued compaction over a longer period of time. In addition, laboratory tests have shown that the application of a dynamic load results in higher fiberboard compaction compared to a static load. The test conditions and sample geometric/loading configurations were chosen to simulate the regulatory requirements for 9975 package input dynamic loading. Dynamic testing was conducted to acquire immediate and cumulative changes in geometric data for various moisture levels. Two sample sets have undergone a complete dynamic test regimen, one set for 27 weeks, and the second set for 47 weeks. The dynamic input, data acquisition, test effects on sample dynamic parameters, and results from this test program are summarized and compared to regulatory specifications for dynamic loading. Compaction of the bottom fiberboard layers due to the accumulation of moisture is one possible cause of an increase in the axial gap at the top of the package. The net compaction of the bottom layers will directly add to the axial gap. The moisture which caused this compaction migrated from the middle region of the fiberboard assembly (which is typically the hottest). This will cause the middle region to shrink axially, which will also contribute directly to the axial gap. Measurement of the axial gap provides a screening tool for identifying significant change in the fiberboard condition. The data in this report provide a basis to evaluate the impact of moisture and fiberboard compaction on 9975 package performance

  12. Teaming with Technology Research Project, September 30, 2000-June 30, 2001. Final Project Report.

    ERIC Educational Resources Information Center

    Heinlein, Ken B.

    This final report presents findings of a Wyoming research project designed to test the possibility of using interactive technology in the assessment, at a distance, of infants and toddlers in rural or frontier areas. The project compared the quality of reports developed when a transdisciplinary assessment team conducted assessments either in…

  13. The Midlands Consortium Star Schools Project: Final Report, Final Evaluation Report, Final Evaluation Report Appendices.

    ERIC Educational Resources Information Center

    Midlands Consortium.

    The reports presented in this document describe the results of the first 2 years of the Midlands Consortium Star Schools Project (MCSSP) (October 1, 1988-December 31, 1990). The first report summarizes the major accomplishments of the MCSSP, including: (1) the installation of communications satellites at schools in Alabama, Kansas, Mississippi,…

  14. Shawmut hydroelectric redevelopment project. Final technical and construction cost report

    SciTech Connect

    1982-08-01

    This report describes the major steps undertaken by the Central Maine Power Company to redevelop an old existing lowhead (19 to 23 ft) hydroelectric station and, at the same time, demonstrate the commercial viability of such a venture. The report addresses the process of site selection, preliminary conceptual design for determining economic viability, licensing and the regulatory process, final design, and project construction with the objective of presenting to the reader a technical and economical guide useful for a similar undertaking.

  15. Advanced Air Transportation Technologies Project, Final Document Collection

    NASA Technical Reports Server (NTRS)

    Mogford, Richard H.; Wold, Sheryl (Editor)

    2008-01-01

    This CD ROM contains a compilation of the final documents of the Advanced Air Transportation Technologies (AAIT) project, which was an eight-year (1996 to 2004), $400M project managed by the Airspace Systems Program office, which was part of the Aeronautics Research Mission Directorate at NASA Headquarters. AAIT focused on developing advanced automation tools and air traffic management concepts that would help improve the efficiency of the National Airspace System, while maintaining or enhancing safety. The documents contained in the CD are final reports on AAIT tasks that serve to document the project's accomplishments over its eight-year term. Documents include information on: Advanced Air Transportation Technologies, Autonomous Operations Planner, Collaborative Arrival Planner, Distributed Air/Ground Traffic Management Concept Elements 5, 6, & 11, Direct-To, Direct-To Technology Transfer, Expedite Departure Path, En Route Data Exchange, Final Approach Spacing Tool - (Active and Passive), Multi-Center Traffic Management Advisor, Multi Center Traffic Management Advisor Technology Transfer, Surface Movement Advisor, Surface Management System, Surface Management System Technology Transfer and Traffic Flow Management Research & Development.

  16. United Nations (UN) performance oriented packaging (POP) testing of DS2 containers. Final report

    SciTech Connect

    Meyer, W.R.

    1992-02-01

    The U.S. Army Defense Ammunition Center and School (USADACS), Validation Engineering Division (SMCAC-DEV), was tasked by U.S. Army Armament Research, Development and Engineering Center (ARDEC), SMCAR-ESK, to perform Performance Oriented Packaging (POP) testing on DS2, level 11, containers to determine their suitability for the transportation and storage of chemical decontaminating agents. At ARDEC, SMCAR-ESK, requested POP testing was conducted at the level I requirements with all containers passing this more severe testing. The following report contains details of the tests conducted.

  17. Final Scientific Report - Wind Powering America State Outreach Project

    SciTech Connect

    Sinclair, Mark; Margolis, Anne

    2012-02-01

    The goal of the Wind Powering America State Outreach Project was to facilitate the adoption of effective state legislation, policy, finance programs, and siting best practices to accelerate public acceptance and development of wind energy. This was accomplished by Clean Energy States Alliance (CESA) through provision of informational tools including reports and webinars as well as the provision of technical assistance to state leaders on wind siting, policy, and finance best practices, identification of strategic federal-state partnership activities for both onshore and offshore wind, and participation in regional wind development collaboratives. The Final Scientific Report - Wind Powering America State Outreach Project provides a summary of the objectives, activities, and outcomes of this project as accomplished by CESA over the period 12/1/2009 - 11/30/2011.

  18. Tractor Mechanics. Maintaining and Servicing the Power Train, Learning Activity Packages 49-53; Maintaining and Servicing the Clutch, Learning Activity Packages 54-59; Maintaining and Servicing the Transmission and Differential, Learning Activity Packages 60-68; Maintaining and Servicing the Final Drive, Learning Activity Packages 69-77.

    ERIC Educational Resources Information Center

    Clemson Univ., SC. Vocational Education Media Center.

    This series of learning activity packages focuses on four areas of tractor mechanics: (1) maintaining and servicing the power train, (2) maintaining and servicing the clutch, (3) maintaining and servicing the transmission and differential, and (4) maintaining and servicing the final drive. Each of the twenty-nine illustrated learning activity…

  19. Third Stage Report on the Learning Package Project in International Studies Supported by Grant (GY-9343) of the National Science Foundation.

    ERIC Educational Resources Information Center

    Coplin, William D.

    The Learning Package Project in International Studies is reported for the activities between August 1973 and October 1974. The first section of the report gives a history of the original packages supported by the project and the contributions made toward developing a group of scholars-instructors necessary to sustain the development, evaluation,…

  20. BX in situ oil shale project. Final report

    SciTech Connect

    Dougan, P.M.

    1983-09-01

    The objective of the Project was to demonstrate the technical feasibility of using superheated steam as a heat-carrying medium to retort in situ the oil shale in the Green River Formation leached zone and provide a mechanism for the recovery of the retorted shale oil with a minimum impact on the environment. Utilizing primarily the natural porosity in the leached zone, approximately 450 billion Btu's of heat have been injected into injection wells at the project site over a 2-year period in an attempt to heat to retorting temperatures in a shale zone approximately 540 feet thick and covering about one acre. The field Project is located at Equity's BX In Situ site in Rio Blanco County in northwestern Colorado. This final report summarizes the field and laboratory work conducted as the BX In Situ Oil Shale Project, a project jointly funded by the US Department of Energy Equity Oil Company under a Cooperative Agreement entered into on March 1, 1977. The September 15, 1982, and includes a period of two years from September 18, 1979 to September 15, 1982, during which superheated steam and hot water were injected into an array of eight injection wells completed in the leached zone oil shale of the Parachute Creek member of the Green River Formation in the Piceance Creek Basin of northwestern Colorado. (20 figures, 21 tables)

  1. Competency-Based Transfer Pilot Project--Final Report. Executive Summary [and] Competency-Based Transfer Pilot Project: Final Report on House Bill 1909

    ERIC Educational Resources Information Center

    Washington Higher Education Coordinating Board, 2006

    2006-01-01

    This publication contains the following: (1) Competency-Based Transfer Pilot Project--Final Report. Executive Summary (January 2006); and (2) Competency-Based Transfer Pilot Project: Final Report on House Bill 1909 (January 2005). In 2003, the legislature and governor enacted House Bill 1909 to create a pilot project on competency-based transfer…

  2. Final report for the Advanced Natural Gas Vehicle Project

    SciTech Connect

    John Wozniak

    1999-02-16

    The project objective was to develop the technologies necessary to prototype a dedicated compressed natural gas (CNG) powered, mid-size automobile with operational capabilities comparable to gasoline automobiles. A system approach was used to design and develop the engine, gas storage system and vehicle packaging. The 2.4-liter DOHC engine was optimized for natural gas operation with high-compression pistons, hardened exhaust valves, a methane-specific catalytic converter and multi-point gaseous injection. The chassis was repackaging to increase space for fuel storage with a custom-designed, cast-aluminum, semi-trailing arm rear suspension system, a revised flat trunk sheet-metal floorpan and by equipping the car with run-flat tires. An Integrated Storage system (ISS) was developed using all-composite, small-diameter cylinders encapsulated within a high-strength fiberglass shell with impact-absorbing foam. The prototypes achieved the target goals of a city/highway driving range of 300 miles, ample trunk capacity, gasoline vehicle performance and ultra low exhaust emissions.

  3. Final Report for USGS NEHRP Project 08HQGR0022

    SciTech Connect

    Rodgers, A. J.

    2015-09-29

    This is the final report for United States Geological Survey (USGS) National Earthquake Hazard Reduction Program (NEHRP) Project 08HQGR0022, entitled “Quantifying Uncertainties in Ground Motion Simulations for Scenario Earthquakes on the HaywardRodgers Creek Fault System Using the USGS 3D Seismic Velocity Model and Realistic Pseudodynamics Ruptures”. Work for this project involved three-dimensional (3D) simulations of ground motions for Hayward Fault (HF) earthquakes. We modeled moderate events on the HF and used them to evaluate the USGS 3D model of the San Francisco Bay Area. We also contributed to ground motions modeling effort for a large suite of scenario earthquakes on the HF. Results were presented at conferences (see appendix) and in one peer-reviewed publication (Aagaard et al., 2010).

  4. Programmable SAW development :Sandia/NASA project final report.

    SciTech Connect

    Brocato, Robert Wesley

    2004-10-01

    This report describes a project to develop both fixed and programmable surface acoustic wave (SAW) correlators for use in a low power space communication network. This work was funded by NASA at Sandia National Laboratories for fiscal years 2004, 2003, and the final part of 2002. The role of Sandia was to develop the SAW correlator component, although additional work pertaining to use of the component in a system and system optimization was also done at Sandia. The potential of SAW correlator-based communication systems, the design and fabrication of SAW correlators, and general system utilization of those correlators are discussed here.

  5. Hellsgate Winter Range : Wildlife Mitigation Project. Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  6. Tidd PFBC Demonstration Project: Public final design report

    SciTech Connect

    Not Available

    1992-10-01

    This Public Final Design Report describes the 70 MW(e) Tidd PFBC Demonstration Plant under construction in Brilliant, Ohio. This project is receiving cost-sharing from the US Department of Energy (DOE), and is being administered by the Morgantown Energy Technology Center in accordance with DOE Cooperative Agreement No. DE-FC21-87 MC24132.000. The project is also receiving costsharing from the State of Ohio. This award is being administered by the Ohio Coal Development Office. The Tidd PFBC Demonstration Project is the first utility-scale demonstration project in the US. Its objective is to demonstrate that the Pressurized Fluidized Bed Combustion (PFBC) combined-cycle technology is an economic, reliable, and environmentally superior alternative to conventional technology in using high-sulfur coal to generate electricity. Detailed design of the plant began in May 1987, leading to the start of construction in April 1988. First coal fire occurred in November 1990, and the three-year test program began in February 1991.

  7. Final Technical Report - Kotzebue Wind Power Project - Volume II

    SciTech Connect

    Rana Zucchi, Global Energy Concepts, LLC; Brad Reeve, Kotzebue Electric Association; DOE Project Officer - Doug Hooker

    2007-10-31

    The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEA’s wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and community outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.

  8. A Special Education Management System: ESEA Title III, Project No. 1328. Final Project Report.

    ERIC Educational Resources Information Center

    Santa Cruz County Superintendent of Schools, CA.

    Presented is the final report on a 3-year project sponsored by the Santa Cruz County, California Office of Education to develop a pupil assessment instrument listing behavioral characteristics of physically exceptional children (K-12) and to implement a program management system to serve 1,200 mentally retarded, educationally handicapped…

  9. Forest Park Pilot Project. Child Development Associate Training Project Final Documentation Report.

    ERIC Educational Resources Information Center

    Saint Louis Community Coll. at Forest Park, MO.

    The planning and implementation of a pilot CDA training project is described in this final report to the Office of Child Development by the Human Services Department, Social Science Division of the St. Louis Community College at Forest Park. Staff training, selection of candidates and curriculum development are emphasized early in the report. The…

  10. Ferrocyanide safety project ferrocyanide aging studies. Final report

    SciTech Connect

    Lilga, M.A.; Hallen, R.T.; Alderson, E.V.

    1996-06-01

    This final report gives the results of the work conducted by Pacific Northwest National Laboratory (PNNL) from FY 1992 to FY 1996 on the Ferrocyanide Aging Studies, part of the Ferrocyanide Safety Project. The Ferrocyanide Safety Project was initiated as a result of concern raised about the safe storage of ferrocyanide waste intermixed with oxidants, such as nitrate and nitrite salts, in Hanford Site single-shell tanks (SSTs). In the laboratory, such mixtures can be made to undergo uncontrolled or explosive reactions by heating dry reagents to over 200{degrees}C. In 1987, an Environmental Impact Statement (EIS), published by the U.S. Department of Energy (DOE), Final Environmental Impact Statement, Disposal of Hanford Defense High-Level Transuranic and Tank Waste, Hanford Site, Richland, Washington, included an environmental impact analysis of potential explosions involving ferrocyanide-nitrate mixtures. The EIS postulated that an explosion could occur during mechanical retrieval of saltcake or sludge from a ferrocyanide waste tank, and concluded that this worst-case accident could create enough energy to release radioactive material to the atmosphere through ventilation openings, exposing persons offsite to a short-term radiation dose of approximately 200 mrem. Later, in a separate study (1990), the General Accounting Office postulated a worst-case accident of one to two orders of magnitude greater than that postulated in the DOE EIS. The uncertainties regarding the safety envelope of the Hanford Site ferrocyanide waste tanks led to the declaration of the Ferrocyanide Unreviewed Safety Question (USQ) in October 1990.

  11. rAvis: an R-package for downloading information stored in Proyecto AVIS, a citizen science bird project.

    PubMed

    Varela, Sara; González-Hernández, Javier; Casabella, Eduardo; Barrientos, Rafael

    2014-01-01

    Citizen science projects store an enormous amount of information about species distribution, diversity and characteristics. Researchers are now beginning to make use of this rich collection of data. However, access to these databases is not always straightforward. Apart from the largest and international projects, citizen science repositories often lack specific Application Programming Interfaces (APIs) to connect them to the scientific environments. Thus, it is necessary to develop simple routines to allow researchers to take advantage of the information collected by smaller citizen science projects, for instance, programming specific packages to connect them to popular scientific environments (like R). Here, we present rAvis, an R-package to connect R-users with Proyecto AVIS (http://proyectoavis.com), a Spanish citizen science project with more than 82,000 bird observation records. We develop several functions to explore the database, to plot the geographic distribution of the species occurrences, and to generate personal queries to the database about species occurrences (number of individuals, distribution, etc.) and birdwatcher observations (number of species recorded by each collaborator, UTMs visited, etc.). This new R-package will allow scientists to access this database and to exploit the information generated by Spanish birdwatchers over the last 40 years. PMID:24626233

  12. rAvis: an R-package for downloading information stored in Proyecto AVIS, a citizen science bird project.

    PubMed

    Varela, Sara; González-Hernández, Javier; Casabella, Eduardo; Barrientos, Rafael

    2014-01-01

    Citizen science projects store an enormous amount of information about species distribution, diversity and characteristics. Researchers are now beginning to make use of this rich collection of data. However, access to these databases is not always straightforward. Apart from the largest and international projects, citizen science repositories often lack specific Application Programming Interfaces (APIs) to connect them to the scientific environments. Thus, it is necessary to develop simple routines to allow researchers to take advantage of the information collected by smaller citizen science projects, for instance, programming specific packages to connect them to popular scientific environments (like R). Here, we present rAvis, an R-package to connect R-users with Proyecto AVIS (http://proyectoavis.com), a Spanish citizen science project with more than 82,000 bird observation records. We develop several functions to explore the database, to plot the geographic distribution of the species occurrences, and to generate personal queries to the database about species occurrences (number of individuals, distribution, etc.) and birdwatcher observations (number of species recorded by each collaborator, UTMs visited, etc.). This new R-package will allow scientists to access this database and to exploit the information generated by Spanish birdwatchers over the last 40 years.

  13. Diagnostic Testing Package DX v 2.0 Technical Specification. Methodology Project.

    ERIC Educational Resources Information Center

    McArthur, David

    This paper contains the technical specifications, schematic diagrams, and program printout for a computer software package for the development and administration of diagnostic tests. The second version of the Diagnostic Testing Package DX consists of a PASCAL-based set of modules located in two main programs: (1) EDITTEST creates, modifies, and…

  14. 76 FR 21403 - Notice of Availability of the Final Environmental Impact Statement for the Genesis Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-15

    ...] Notice of Availability of the Final Environmental Impact Statement for the Genesis Project, Eureka County... Final Environmental Impact Statement (EIS) for the Newmont Mining Corporation's proposed Genesis Project... its notice in the Federal Register. ADDRESSES: Printed copies of the Genesis Project Final EIS...

  15. Blue Creek Winter Range : Wildlife Mitigation Project : Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration; United States. Bureau of Indian Affairs; Spokane Tribe of the Spokane Reservation, Washington

    1994-11-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Agreement pertaining to the Blue Creek Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Spokane Tribe, Upper Columbia United Tribes, and the Bureau of Indian Affairs (BIA). If fully implemented, the proposed action would allow the sponsors to protect and enhance 2,631 habitat units of big game winter range and riparian shrub habitat on 2,185 hectares (5,400 acres) of Spokane Tribal trust lands, and to conduct long term wildlife management activities within the Spokane Indian Reservation project area. This Final Environmental Assessment (EA) examines the potential environmental effects of securing land and conducting wildlife habitat enhancement and long term management activities within the boundaries of the Spokane Indian Reservation. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat adversely affected by the construction of Grand Coulee Dam and its reservoir.

  16. Final Report Sustained Spheromak Physics Project FY 1997 - FY 1999

    SciTech Connect

    Hooper, E.B.; Hill, D.N.

    2000-02-29

    This is the final report on the LDRD SI-funded Sustained Spheromak Physics Project for the years FY1997-FY1999, during which the SSPX spheromak was designed, built, and commissioned for operation at LLNL. The specific LDRD project covered in this report concerns the development, installation, and operation of specialized hardware and diagnostics for use on the SSPX facility in order to study energy confinement in a sustained spheromak plasma configuration. The USDOE Office of Fusion Energy Science funded the construction and routine operation of the SSPX facility. The main distinctive feature of the spheromak is that currents in the plasma itself produce the confining toroidal magnetic field, rather than external coils, which necessarily thread the vacuum vessel. There main objective of the Sustained Spheromak Physics Project was to test whether sufficient energy confinement could be maintained in a spheromak plasma sustained by DC helicity injection. Achieving central electron temperatures of several hundred eV would indicate this. In addition, we set out to determine how the energy confinement scales with T{sub c} and to relate the confinement time to the level of internal magnetic turbulence. Energy confinement and its scaling are the central technical issues for the spheromak as a fusion reactor concept. Pending the outcome of energy confinement studies now under way, the spheromak could be the basis for an attractive fusion reactor because of its compact size, simply-connected magnetic geometry, and potential for steady-state current drive.

  17. Northeast Oregon Hatchery Project, Conceptual Design Report, Final Report.

    SciTech Connect

    Watson, Montgomery

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  18. Umatilla Satellite and Release Sites Project : Final Conceptual Design Report.

    SciTech Connect

    Montgomery, James M.

    1992-03-01

    This report presents the results of site analysis for the Umatilla Satellite and Release Sites Project. The purpose of this project is to provide engineering services for the siting and conceptual design of satellite and release facilities for the Umatilla Basin hatchery program. The Umatilla Basin hatchery program consists of artificial production facilities for salmon and steelhead to enhance production in the Umatilla River as defined in the Umatilla master plan approved in 1989 by the Northwest Power Planning Council. Facilities identified in the master plan include adult salmon broodstock holding and spawning facilities, facilities for recovery, acclimation, and/or extended rearing of salmon juveniles, and development of river sites for release of hatchery salmon and steelhead. The historic and current distribution of fall chinook, summer chinook, and coho salmon and steelhead trout was summarized for the Umatilla River basin. Current and future production and release objectives were reviewed. Twenty seven sites were evaluated for the potential development of facilities. Engineering and environmental attributes of the sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  19. Umatilla Satellite and Release Sites Project : Final Siting Report.

    SciTech Connect

    Montgomery, James M.

    1992-04-01

    This report presents the results of site analysis for the Umatilla Satellite and Release Sites Project. The purpose of this project is to provide engineering services for the siting and conceptual design of satellite and release facilities for the Umatilla Basin hatchery program. The Umatilla Basin hatchery program consists of artificial production facilities for salmon and steelhead to enhance production in the Umatilla River as defined in the Umatilla master plan approved in 1989 by the Northwest Power Planning Council. Facilities identified in the master plan include adult salmon broodstock holding and spawning facilities, facilities for recovery, acclimation, and/or extended rearing of salmon juveniles, and development of river sites for release of hatchery salmon and steelhead. The historic and current distribution of fall chinook, summer chinook, and coho salmon and steelhead trout was summarized for the Umatilla River basin. Current and future production and release objectives were reviewed. Twenty seven sites were evaluated for the potential and development of facilities. Engineering and environmental attributes of the sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  20. NEET Micro-Pocket Fission Detector. Final Project report

    SciTech Connect

    Unruh, T.; Rempe, Joy; McGregor, Douglas; Ugorowski, Philip; Reichenberger, Michael; Ito, Takashi; Villard, J.-F.

    2014-09-01

    A collaboration between the Idaho National Laboratory (INL), the Kansas State University (KSU), and the French Alternative Energies and Atomic Energy Commission, Commissariat à l'Énergie Atomique et aux Energies Alternatives, (CEA), is funded by the Nuclear Energy Enabling Technologies (NEET) program to develop and test Micro-Pocket Fission Detectors (MPFDs), which are compact fission chambers capable of simultaneously measuring thermal neutron flux, fast neutron flux and temperature within a single package. When deployed, these sensors will significantly advance flux detection capabilities for irradiation tests in US Material Test Reactors (MTRs). Ultimately, evaluations may lead to a more compact, more accurate, and longer lifetime flux sensor for critical mock-ups, and high performance reactors, allowing several Department of Energy Office of Nuclear Energy (DOE-NE) programs to obtain higher accuracy/higher resolution data from irradiation tests of candidate new fuels and materials. Specifically, deployment of MPFDs will address several challenges faced in irradiations performed at MTRs: Current fission chamber technologies do not offer the ability to measure fast flux, thermal flux and temperature within a single compact probe; MPFDs offer this option. MPFD construction is very different than current fission chamber construction; the use of high temperature materials allow MPFDs to be specifically tailored to survive harsh conditions encountered in-core of high performance MTRs. The higher accuracy, high fidelity data available from the compact MPFD will significantly enhance efforts to validate new high-fidelity reactor physics codes and new multi-scale, multi-physics codes. MPFDs can be built with variable sensitivities to survive the lifetime of an experiment or fuel assembly in some MTRs, allowing for more efficient and cost effective power monitoring. The small size of the MPFDs allows multiple sensors to be deployed, offering the potential to accurately

  1. 76 FR 2949 - Notice of Final Federal Agency Actions on Proposed Project in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-18

    ... Construction Project in the State of Washington. Those actions grant approval for the project. DATES: By this... Construction Project. The project includes constructing pontoons sufficient to replace the existing traffic... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Project in...

  2. Macroencapsulation of mixed waste debris at the Hanford Nuclear Reservation -- Final project report by AST Environmental Services, LLC

    SciTech Connect

    Baker, T.L.

    1998-02-25

    This report summarizes the results of a full-scale demonstration of a high density polyethylene (HDPE) package, manufactured by Arrow Construction, Inc. of Montgomery, Alabama. The HDPE package, called ARROW-PAK, was designed and patented by Arrow as both a method to macroencapsulation of radioactively contaminated lead and as an improved form of waste package for treatment and interim and final storage and/or disposal of drums of mixed waste. Mixed waste is waste that is radioactive, and meets the criteria established by the United States Environmental Protection Agency (US EPA) for a hazardous material. Results from previous testing conducted for the Department of Energy (DOE) at the Idaho National Engineering Laboratory in 1994 found that the ARROW-PAK fabrication process produces an HDPE package that passes all helium leak tests and drop tests, and is fabricated with materials impervious to the types of environmental factors encountered during the lifetime of the ARROW-PAK, estimated to be from 100 to 300 years. Arrow Construction, Inc. has successfully completed full-scale demonstration of its ARROW-PAK mixed waste macroencapsulation treatment unit at the DOE Hanford Site. This testing was conducted in accordance with Radiological Work Permit No. T-860, applicable project plans and procedures, and in close consultation with Waste Management Federal Services of Hanford, Inc.`s project management, health and safety, and quality assurance representatives. The ARROW-PAK field demonstration successfully treated 880 drums of mixed waste debris feedstock which were compacted and placed in 149 70-gallon overpack drums prior to macroencapsulation in accordance with the US EPA Alternate Debris Treatment Standards, 40 CFR 268.45. Based on all of the results, the ARROW-PAK process provides an effective treatment, storage and/or disposal option that compares favorably with current mixed waste management practices.

  3. Agricultural Energy Curriculum Development Project. Research and Development Project in Career Education, Vocational. Final Project.

    ERIC Educational Resources Information Center

    Wacholz, Marlin

    A project was conducted to develop energy instructional units which would fit into each year of a three-year farm business management curriculum. Four curriculum units which focus on fertilizer management in crop production were developed. The first unit was designed to develop farmers' awareness of energy as a vital resource to their businesses…

  4. High Performance Building Facade Solutions - PIER Final Project Report

    SciTech Connect

    Lee, Eleanor; Selkowitz, Stephen

    2009-12-31

    Building facades directly influence heating and cooling loads and indirectly influence lighting loads when daylighting is considered, and are therefore a major determinant of annual energy use and peak electric demand. Facades also significantly influence occupant comfort and satisfaction, making the design optimization challenge more complex than many other building systems.This work focused on addressing significant near-term opportunities to reduce energy use in California commercial building stock by a) targeting voluntary, design-based opportunities derived from the use of better design guidelines and tools, and b) developing and deploying more efficient glazings, shading systems, daylighting systems, facade systems and integrated controls. This two-year project, supported by the California Energy Commission PIER program and the US Department of Energy, initiated a collaborative effort between The Lawrence Berkeley National Laboratory (LBNL) and major stakeholders in the facades industry to develop, evaluate, and accelerate market deployment of emerging, high-performance, integrated facade solutions. The LBNL Windows Testbed Facility acted as the primary catalyst and mediator on both sides of the building industry supply-user business transaction by a) aiding component suppliers to create and optimize cost effective, integrated systems that work, and b) demonstrating and verifying to the owner, designer, and specifier community that these integrated systems reliably deliver required energy performance. An industry consortium was initiated amongst approximately seventy disparate stakeholders, who unlike the HVAC or lighting industry, has no single representative, multi-disciplinary body or organized means of communicating and collaborating. The consortium provided guidance on the project and more importantly, began to mutually work out and agree on the goals, criteria, and pathways needed to attain the ambitious net zero energy goals defined by California and

  5. NTRCI Legacy Engine Research and Development Project Final Technical Report

    SciTech Connect

    Smith-Holbert, Connie; Petrolino, Joseph; Watkins, Bart; Irick, David

    2011-12-31

    The Legacy engine is a completely new design, transitional diesel engine, replacing the reciprocating engine with a rotary engine. The Legacy engine offers significant advances over conventional internal combustion engines in 1) power to weight ratio; 2) multiple fuel acceptance; 3) fuel economy; and 4) environmental compliance. These advances are achieved through a combination of innovative design geometry, rotary motion, aspiration simplicity, and manufacturing/part simplicity. The key technical challenge to the Legacy engine's commercialization, and the focus of this project, was the development of a viable roton tip seal. The PST concept for the roton tip seal was developed into a manufacturable design. The design was evaluated using a custom designed and fabricated seal test fixture and further refined. This design was incorporated into the GEN2.5A prototype and tested for achievable compression pressure. The Decision Point at the end of Phase 1 of the project (described below) was to further optimize the existing tip seal design. Enhancements to the tip seal design were incorporated into the GEN2.5B prototype and tested and evaluated using the iterative research strategy described below. Compression pressures adequate for compression ignition of diesel fuel were achieved, although not consistently in all combustion volumes. The variation in compression pressures was characterized versus design features. As the roton tip seal performance was improved, results pointed toward inadequate performance of the housing side seals. Enhancement of the housing side seal system was accomplished using a custom designed side seal test fixture. The design enhancements developed with the test fixture were also incorporated into the GEN2.5B prototype and tested and evaluated using the iterative research strategy described below. Finally, to simplify the requirements for the roton tip seals and to enhance the introduction and combustion of fuel, a flush-mount fuel injector was

  6. CERTS Microgrid Laboratory Test Bed - PIER Final Project Report

    SciTech Connect

    Eto, Joseph H.; Eto, Joseph H.; Lasseter, Robert; Schenkman, Ben; Klapp, Dave; Linton, Ed; Hurtado, Hector; Roy, Jean; Lewis, Nancy Jo; Stevens, John; Volkommer, Harry

    2008-07-25

    The objective of the CERTS Microgrid Laboratory Test Bed project was to enhance the ease of integrating small energy sources into a microgrid. The project accomplished this objective by developing and demonstrating three advanced techniques, collectively referred to as the CERTS Microgrid concept, that significantly reduce the level of custom field engineering needed to operate microgrids consisting of small generating sources. The techniques comprising the CERTS Microgrid concept are: 1) a method for effecting automatic and seamless transitions between grid-connected and islanded modes of operation; 2) an approach to electrical protection within the microgrid that does not depend on high fault currents; and 3) a method for microgrid control that achieves voltage and frequency stability under islanded conditions without requiring high-speed communications. The techniques were demonstrated at a full-scale test bed built near Columbus, Ohio and operated by American Electric Power. The testing fully confirmed earlier research that had been conducted initially through analytical simulations, then through laboratory emulations, and finally through factory acceptance testing of individual microgrid components. The islanding and resychronization method met all Institute of Electrical and Electronics Engineers 1547 and power quality requirements. The electrical protections system was able to distinguish between normal and faulted operation. The controls were found to be robust and under all conditions, including difficult motor starts. The results from these test are expected to lead to additional testing of enhancements to the basic techniques at the test bed to improve the business case for microgrid technologies, as well to field demonstrations involving microgrids that involve one or mroe of the CERTS Microgrid concepts.

  7. Final-Year Projects as a Major Element in the IE Curriculum

    ERIC Educational Resources Information Center

    Vitner, G.; Rozenes, S.

    2009-01-01

    This paper presents a multi-perspective view of the final-year project of an industrial engineering and management (IEM) department. The final year project is a major element of a 4-year curriculum within any engineering discipline. Such a project gives the student an opportunity to use and implement methods, techniques and tools that he or she…

  8. Sibanye Methods for Prevention Packages Program Project Protocol: Pilot Study of HIV Prevention Interventions for Men Who Have Sex With Men in South Africa

    PubMed Central

    Kearns, Rachel; Siegler, Aaron J; Phaswana-Mafuya, Nancy; Bekker, Linda-Gail; Stephenson, Rob; Baral, Stefan D; Brookmeyer, Ron; Yah, Clarence S; Lambert, Andrew J; Brown, Benjamin; Rosenberg, Eli; Blalock Tharp, Mondie; de Voux, Alex; Beyrer, Chris; Sullivan, Patrick S

    2014-01-01

    Background Human immunodeficiency virus (HIV) prevention intervention programs and related research for men who have sex with men (MSM) in the southern African region remain limited, despite the emergence of a severe epidemic among this group. With a lack of understanding of their social and sexual lives and HIV risks, and with MSM being a hidden and stigmatized group in the region, optimized HIV prevention packages for southern African MSM are an urgent public health and research priority. Objective The objective of the Sibanye Health Project is to develop and evaluate a combination package of biomedical, behavioral, and community-level HIV prevention interventions and services for MSM in South Africa. Methods The project consists of three phases: (1) a comprehensive literature review and summary of current HIV prevention interventions (Phase I), (2) agent-based mathematical modeling of HIV transmission in southern African MSM (Phase II), and (3) formative and stigma-related qualitative research, community engagement, training on providing health care to MSM, and the pilot study (Phase III). The pilot study is a prospective one-year study of 200 men in Cape Town and Port Elizabeth, South Africa. The study will assess a package of HIV prevention services, including condom and condom-compatible lubricant choices, risk-reduction counseling, couples HIV testing and counseling, pre-exposure prophylaxis (PrEP) for eligible men, and non-occupational post-exposure prophylaxis for men with a high risk exposure. The pilot study will begin in October 2014. Results Preliminary results from all components but the pilot study are available. We developed a literature review database with meta-data extracted from 3800 documents from 67 countries. Modeling results indicate that regular HIV testing and promotion of condom use can significantly impact new HIV infections among South African MSM, even in the context of high coverage of early treatment of HIV-positive men and high

  9. Neutral Site Planning Project, Final Report. Volume III: Curriculum Development.

    ERIC Educational Resources Information Center

    Providence School Dept., RI.

    A curriculum package designed for Providence, Rhode Island's proposed magnet school program is presented in this report. Included are the curricula for Health Careers, Creative, Performing and Communications Arts, Business and Management, and Government and Law Magnet Programs. General information about each curriculum covers overall goals,…

  10. Vendor Assessment for the Waste Package Closure System (Yucca Mountain Project)

    SciTech Connect

    Shelton-Davis, C.V.

    2003-09-26

    The Idaho National Engineering and Environmental Laboratory (INEEL) has been tasked with developing, designing, constructing, and operating a full-scale prototype of the work package closure system. As a precursor to developing the conceptual design, all commercially available equipment was assessed to identify any existing technology gaps. This report presents the results of that assessment for all major equipment.

  11. Vendor Assessment for the Waste Package Closure System (Yucca Mtn. Project)

    SciTech Connect

    Colleen Shelton-Davis

    2003-09-01

    The Idaho National Engineering and Environmental Laboratory (INEEL) has been tasked with developing, designing, constructing, and operating a full-scale prototype of the work package closure system. As a precursor to developing the conceptual design, all commercially available equipment was assessed to identify any existing technology gaps. This report presents the results of that assessment for all major equipment.

  12. Fractions and Decimals, Ratio and Percent. Mathematics Evaluation Materials Package Project.

    ERIC Educational Resources Information Center

    Ontario Inst. for Studies in Education, Toronto.

    The Mathematics Evaluation Materials Package (MEMP) is a set of objectives and companion test items for mathematics education in Grades 4 to 6. Developed for classroom use in a setting that emphasizes increased teacher and principal decision-making and flexible curricular guidelines, it distinguishes itself from other evaluation devices in the…

  13. Project Familia. Final Evaluation Report, 1993-94. OER Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Educational Research.

    Project Familia was an Elementary and Secondary Education Act Title VII project in its second year in 1993-94 in New York City. Project Familia served 77 children at 3 schools who were identified as limited English proficient, special education students in prekindergarten through fifth grade and their parents. The project provided after-school…

  14. The STAIRRS project, work package 1: a cost-effectiveness analysis of railway noise reduction on a European scale

    NASA Astrophysics Data System (ADS)

    Oertli, J.

    2003-10-01

    Noise control is a major economic factor for the railways as national and European Union environmental legislation is being enacted. In an effort to determine optimal strategies on a European level, the EU fifth framework programme has co-financed the Strategies and Tools to Assess and Implement noise Reducing measures for Railway Systems (STAIRRS) project. Work package 1 developed the necessary software to undertake large-scale cost-effectiveness analyses. The acoustically relevant geographic, traffic and track data were collected for 11 000 km of lines in seven European countries. Standard cost-benefit methodologies were adapted to fit the requirements of the project. An extrapolation mechanism allowed studies on Europe as a whole and, in an approximate manner, also on individual countries. Major conclusions are that the highest cost-effectiveness can be achieved by combining measures; freight rolling stock has a high cost-effectiveness on its own as well as in combination with other measures, especially when combined with track measures; noise barriers, in particular high ones, have a low cost-effectiveness. The conclusions for Europe as a whole are also true for individual countries. The STAIRRS project co-ordinator is the European Rail Research Institute, the work package leader is the Swiss Federal Railways with the participation of AEAT Technology (NL), German Railways, French Railways, PSI-Akustik (A), the Swiss Federal Institute of Technology and the Free University of Brussels.

  15. Development and Validation of a Project Package for Junior Secondary School Basic Science

    ERIC Educational Resources Information Center

    Udofia, Nsikak-Abasi

    2014-01-01

    This was a Research and Developmental study designed to develop and validate projects for Junior Secondary School Basic Science instruction and evaluation. The projects were developed using the project blueprint and sent for validation by experts in science education and measurement and evaluation; using a project validation scale. They were to…

  16. User-Adaptable Microcomputer Graphics Software for Life Science Instruction. Final Project Report.

    ERIC Educational Resources Information Center

    Spain, James D.

    The objectives of the SUMIT project was to develop, evaluate, and disseminate 20 course modules (microcomputer programs) for instruction in general biology and ecology. To encourage broad utilization, the programs were designed for the Apple II microcomputer and written in Applesoft Basic with a user-adaptable format. Each package focused on a key…

  17. Galaxy Classroom Project Evaluation, Language Arts, Grades 3-5. Final Report.

    ERIC Educational Resources Information Center

    Guth, Gloria J. A.; Block, Clifford

    The GALAXY Language Arts Demonstration Program is a package of integrated curricular and instructional approaches that features the organization of instruction around themes presented through television broadcasts, children's literature, classroom activities, and the use of interactive technology. During the GALAXY Project demonstration phase for…

  18. 76 FR 67178 - Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... Energy Regulatory Commission Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement for the Wells Hydrolectric Project In accordance with the National Environmental... environmental impact statement (EIS) for the project. The project occupies 8.60 acres of U.S. Bureau of...

  19. Hawaii Demonstration Project to Avert Unintended Teenage Pregnancy: 1978-1982. Final Report. Executive Summary.

    ERIC Educational Resources Information Center

    Levitt-Merin, Marta; Sutter, Sharon Kingdon

    This final report provides a descriptive overview of three approaches which the Hawaii Demonstration Project initiated to reduce unintended teenage pregnancies. Project evaluation findings are summarized; both qualitative and quantitative data are presented for a comprehensive picture of the project and its input. Project limitations and successes…

  20. Project Aprendizaje. 1990-91 Final Evaluation Profile. OREA Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Research, Evaluation, and Assessment.

    An evaluation was done of New York City Public Schools' Project Aprendizaje, which served disadvantaged, immigrant, Spanish-speaking high school students at Seward Park High School in Manhattan. The Project enrolled 290 students in grades 9 through 12, 93.1 percent of whom were eligible for the Free Lunch Program. The Project provided students of…

  1. Project HEED. Final Evaluation Report, 1974-1975.

    ERIC Educational Resources Information Center

    Edington, Everett D.; Pettibone, Timothy J.

    Project HEED's (Heed Ethnic Education Deplorization) main emphasis in 1974-75 was to develop reading and cultural awareness skills for kindergarten through 4th grades in the 7 project schools on American Indian reservations in Arizona. In its 4th year of operation, the project (funded under Elementary and Secondary Education Title III) involved…

  2. Lower Merrimack Valley Workplace Education Project. Final Report.

    ERIC Educational Resources Information Center

    Norris, Cynthia Zylkuski; Breen, Patricia K.

    A description is provided of the Lower Merrimack Valley Workplace Education Project (WEP), an educational project that offers English-as-a-Second-Language (ESL) and job-specific education classes to hourly employees in the Semiconductor Division of Alpha Industries. The challenge of the project was to create a WEP that could accommodate the…

  3. The Coalition Parties' Family Tax Package. The Australian Family Income Transfer Project. AFIT Bulletin No. 7.

    ERIC Educational Resources Information Center

    Brownlee, Helen; And Others

    The Australian Family Income Transfer Project (AFIT) is designed to examine the impact of government policies on the economic well being of Australian families. The AFIT Project uses published national statistics as well as data and information collected by the Australian Institute of Family Studies (the project's sponsor) in its own studies and…

  4. Saudi Arabian seismic deep-refraction profiles; final project report

    USGS Publications Warehouse

    Healy, J.H.; Mooney, W.D.; Blank, H.R.; Gettings, M.E.; Kohler, W.M.; Lamson, R.J.; Leone, L.E.

    1983-01-01

    In February 1978 a seismic deep-refraction profile was recorded by the U.S. Geological Survey along a 1000-km line across the Arabian Shield in western Saudi Arabia. The line begins in Mesozoic cover rocks near Riyadh on the Arabian Platform, leads southwesterly across three major Precambrian tectonic provinces, traverses Cenozoic rocks of the coastal plain near Jizan (Tihamat-Asir), and terminates at the outer edge of the Farasan Bank in the southern Red Sea. More than 500 surveyed recording sites were occupied, including 19 in the Farasan Islands. Six shot points were used: five on land, with most charges placed below the water table in drill holes, and one at sea, with charges placed on the sea floor and detonated from a ship. Slightly more than 61 metric tons of explosives were used in 19 discrete firings. Seismic energy was recorded by 100 newly-developed portable seismic stations deployed in approximately 200 km-long arrays for each firing. Each station consisted of a standard 2-Hz vertical component geophone coupled to a self-contained analog recording instrument equipped with a magnetic-tape cassette. In this final report, we fully document the field and data-processing procedures and present the final seismogram data set as both a digital magnetic tape and as record sections for each shot point. Record sections include a normalized set of seismograms, reduced at 6 km/s, and a true-amplitude set, reduced at 8 km/s, which have been adjusted for amplifier gain, individual shot size, and distance from the shot point. Appendices give recorder station and shot information, digital data set descriptions, computer program listings, arrival times used in the interpretation, and a bibliography of reports published as a result of this project. We used two-dimensional ray-tracing techniques in the data analysis, and our interpretation is based primarily on horizontally layered models. The Arabian Shield is composed, to first-order, of two layers, each about 20 km

  5. Salton Sea Scientific Drilling Project Archival Reference, Final Draft

    SciTech Connect

    1991-03-13

    This report provides an archival reference to the scientific information and other pertinent documents and materials associated with the Salton Sea Scientific Drilling Project (SSDP). This archiving process ensures that valuable technical data and information obtained during the life of the project can be retrieved, organized and maintained as a historical record for future reference. This paper describes the background of the project and the process used for archiving the materials. [DJE-2005

  6. 77 FR 66480 - Final Environmental Impact Statement, Narrows Project, Sanpete County, Utah

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-05

    ... Bureau of Reclamation Final Environmental Impact Statement, Narrows Project, Sanpete County, Utah AGENCY..., announce the availability of the final environmental impact statement on the Narrows Project, a non... Environmental Protection Agency publishes their Notice of Availability of Weekly Receipt of Environmental...

  7. From Geographic Discipline to Inquiring Student. The High School Geography Project. Final Report.

    ERIC Educational Resources Information Center

    Patton, Donald J., Ed.; And Others

    This is the final report of the High School Geography Project (HSGP), born of a joint committee of the National Council of Geographic Education and the Association of American Geographers, 1959-1961. Chapter one presents an interim, rather than final, assessment of the project as it stood in the summer of 1970, at its completion. Chapter two…

  8. 75 FR 7029 - Notice of Availability of the Final Environmental Assessment for Solar Roof Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-16

    ... Geological Survey Notice of Availability of the Final Environmental Assessment for Solar Roof Project AGENCY..., the US Geological Survey (USGS) has prepared a Final Environmental Assessment for the Solar Roof... for the Solar Roof Project should immediately contact the USGS S.O. Conte Anadromous Fish...

  9. Final Design Report for the RH LLW Disposal Facility (RDF) Project

    SciTech Connect

    Austad, S. L.

    2015-05-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  10. Final Design Report for the RH LLW Disposal Facility (RDF) Project

    SciTech Connect

    Austad, Stephanie Lee

    2015-09-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  11. The Lanai Visitor Serving Workplace Literacy Project: Final Performance Report.

    ERIC Educational Resources Information Center

    Hawaii Human Development, Honolulu.

    This report describes the outcomes of a project designed to aid agricultural workers in their transition to hotel jobs. Displaced workers (predominantly Filipino) from a Dole plantation were forced to seek employment in new resorts on Lanai. The goals of the project were to: (1) qualify former Dole employees for jobs in the newly-developed resort…

  12. Project Emerge, Dayton, Ohio. 1972-73 Final Evaluation Report.

    ERIC Educational Resources Information Center

    Dayton City School District, OH.

    Project Emerge, funded under Title VIII of the 1965 Elementary Secondary Education Act, is located in the Model Cities Area, a black-inhabited west side section of Dayton, Ohio. The target school student population is 2,300 of which 20 percent come from families with low incomes. Project Emerge's major objectives are to reduce the dropout rate in…

  13. Tech Prep Intergenerational Curriculum Development Project. Final Report.

    ERIC Educational Resources Information Center

    Texas Tech Univ., Lubbock.

    A project was conducted at Texas Tech University to develop a competency-based curriculum to support statewide implementation of tech prep intergenerational programs (careers in providing services to well elderly persons and to children). Project activities included the following: (1) revision and expansion of the Intergenerational Target…

  14. Solar Energy Information and Education Project. Final Report.

    ERIC Educational Resources Information Center

    Hensley, Michael

    The New Mexico Solar Energy Institute (NMSEI) conducted a concentrated information and education program during 1985. This report summarizes NMSEI's Information and Education project activities. It provides detailed descriptions of project costs and concise recommendations for similar programs. Individual sections contain explanations of the scope…

  15. Multiple Intelligences: Curriculum and Assessment Project. Final Report

    ERIC Educational Resources Information Center

    Hyland, Aine, Ed.

    2011-01-01

    The "Multiple Intelligences, Curriculum and Assessment Project" at University College Cork was a collaborative project carried out between 1995 and 1999. The key research question focused on whether Howard Gardner's theory of Multiple Intelligences could be applied to, and enhance, aspects of curriculum and assessment at primary and second level…

  16. Project Closeout: Guidance for Final Evaluation of Building America Communities

    SciTech Connect

    Norton, P.; Burch, J.; Hendron, B.

    2008-03-01

    This report presents guidelines for Project Closeout. It is used to determine whether the Building America program is successfully facilitating improved design and practices to achieve energy savings goals in production homes. Its objective is to use energy simulations, targeted utility bill analysis, and feedback from project stakeholders to evaluate the performance of occupied BA communities.

  17. Project Aprendizaje. Final Evaluation Report 1992-93.

    ERIC Educational Resources Information Center

    Clark, Andrew

    This report provides evaluative information regarding the effectiveness of Project Aprendizaje, a New York City program that served 269 Spanish-speaking students of limited English proficiency (LEP). The project promoted parent and community involvement by sponsoring cultural events, such as a large Latin American festival. Students developed…

  18. Final Report on the West Side Children's Services Project.

    ERIC Educational Resources Information Center

    Child and Family Services, Buffalo, NY.

    The Child Crisis Project on Buffalo's West Side was a demonstration opportunity financed for a three-year period by the Office of Child Development. The project was primarily a service delivery system designed to move into emergency situations and solve problems, so that the family could continue to function and provide child care. This report…

  19. Bilingual Education Project, Santa Clara County, California. Final Report, 1972.

    ERIC Educational Resources Information Center

    Santa Clara County Office of Education, San Jose, CA.

    The Spanish Dame Bilingual Education Project, located in Santa Clara County, California, served 190 children who came from homes where the primary language was Spanish and who resided within the target area schools of the Alum Rock School District. The objectives of the preschool project were (1) to demonstrate a home-teaching procedure designed…

  20. Honey Lake Geothermal Project, Lassen County, California. Final technical report

    SciTech Connect

    Not Available

    1984-11-01

    This report discusses the drilling, completion, and testing of deep well WEN-2 for a hybrid electric power project which will use the area's moderate temperature geothermal fluids and locally procured wood fuel. The project is located within the Wendel-Amedee Known Geothermal Resource Area. (ACR)

  1. Project Familia. Final Evaluation Report, 1992-93. OREA Report.

    ERIC Educational Resources Information Center

    Clarke, Candice

    Project Familia was an Elementary and Secondary Education Act Title VII funded project that, in the year covered by this evaluation, served 41 special education students of limited English proficiency (LEP) from 5 schools, with the participation of 54 parents and 33 siblings. Participating students received English language enrichment and…

  2. Metropolitan Planning Project, 1977-78. Final Performance Report.

    ERIC Educational Resources Information Center

    Arnoff, Steven M.

    This document provides a description of the Metropolitan Planning Project (MPP), its objectives, strategies, and an evaluation of its implementation in the Boston area. In order to encourage the voluntary elimination, reduction, and prevention of minority group isolation in elementary and secondary schools in Boston, the project focuses on two…

  3. Faces of Change Series. Documentary Film Project: Final Report.

    ERIC Educational Resources Information Center

    Miller, Norman N.

    The objectives of the Educational Materials Project were to produce print materials to accompany "The Faces of Change," a series of 26 films and some 60 essays and instructional documents produced for college classes between 1972 and 1975. The scope of the project covered two film production grants, a grant for archiving uncut footage at the…

  4. The Ninos Especiales Outreach Training Project (NEOTP). Final Report.

    ERIC Educational Resources Information Center

    Bruder, Mary Beth; And Others

    The Ninos Especiales Outreach Training Project was a 3-year federally funded project to provide information, training, and evaluation related to a culturally sensitive, family-focused model of early intervention services for infants with severe disabilities and their families of Puerto Rican heritage. Implementation occurred through three major…

  5. Kentucky Nursing Education Project: Final Report and Recommendations.

    ERIC Educational Resources Information Center

    Kentucky State Council on Higher Education, Frankfort.

    The process, activities, and outcomes of a plan for the development, implementation, and evaluation of a statewide coordinated system for nursing education in Kentucky are described. The background and objectives of the 5-year Kentucky Nursing Education Project are discussed, along with the following project components: organizational base,…

  6. Manufacturing Technology Continuation Project--FY 92. Final Report.

    ERIC Educational Resources Information Center

    Chicago City Colleges, IL. Richard J. Daley Coll.

    A project to identify metalworking subsectors (multiple spindle screw machining and gears machining) for inclusion in the Manufacturing Technology Preparation Program is the subject of this report. The project accomplished the following: developed five courses in multiple spindle, secured large donations of equipment and tooling, established a…

  7. Caribou Bilingual Project. Final Evaluation Report, 1973-1974.

    ERIC Educational Resources Information Center

    Cox, Lorraine

    This is an evaluative report on the Caribou Exemplary Bilingual Project for 1973-1974, its second year. The English-French program involved two kindergarten, two first grade, and two second grade classes. The report includes a description of the project, a discussion of the procedures used to evaluate it, an assessment of each of the five project…

  8. Project HEED. Final Evaluation Report, 1973-74.

    ERIC Educational Resources Information Center

    Edington, Everett D.; Pettibone, Timothy

    1973-74 approximately 1,100 Indian students in grades 1 through 8 participated in Project HEED (Heed Ethnic Educational Depolarization) in Arizona. The project target sites were 59 classrooms at Sacaton, Sells, Peach Springs, San Carlos, Topowa, Many Farms, St. Charles Mission, and Hoteville. Primary objectives were: (1) improvement in reading…

  9. Project HEED, Title III, Section 306. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Hughes, Orval D.

    Project HEED (Heed Ethnic Educational Depolarization) involves over 1,000 Indian children in grades 1-8 in Arizona. The project target sites are 48 classrooms at Sells, Topowa, San Carlos, Many Farms, Hotevilla, Peach Springs, and Sacaton. Objectives are to increase: (1) reading achievement, (2) affective behavior of teachers, (3) motivation by…

  10. Lower Columbia River Terminal Fisheries Research Project : Final Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-04-01

    This notice announces BPA`S`s decision to fund the Oregon Department of Fish and Wildlife (ODFW), the Washington Department of Fish and Wildlife (WDFW), and the Clatsop Economic Development Committee for the Lower Columbia River Terminal Fisheries Research Project (Project). The Project will continue the testing of various species/stocks, rearing regimes, and harvest options for terminal fisheries, as a means to increase lower river sport and commercial harvest of hatchery fish, while providing both greater protection of weaker wild stocks and increasing the return of upriver salmon runs to potential Zone 6 Treaty fisheries. The Project involves relocating hatchery smolts to new, additional pen locations in three bays/sloughs in the lower Columbia River along both the Oregon and Washington sides. The sites are Blind Slough and Tongue Point in Clatsop County, Oregon, and Grays Bay/Deep River, Wahkiakum County, Washington. The smolts will be acclimated for various lengths of time in the net pens and released from these sites. The Project will expand upon an existing terminal fisheries project in Youngs Bay, Oregon. The Project may be expanded to other sites in the future, depending on the results of this initial expansion. BPA`S has determined the project is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required, and BPA`S is issuing this FONSI.

  11. Incentives in Education Project, Impact Evaluation Report. Final Report.

    ERIC Educational Resources Information Center

    Planar Corp., Washington, DC.

    This report describes results of a demonstration project carried out in four cities during 1971-72. The project aimed at exploring the feasibility and impact of two different forms of money incentives payments. In one form -- the "Teacher-Only" model -- the teachers in a school were offered a series of bonuses ranging from $150 to $600 per class…

  12. A VAX/VMS mapped section/virtual memory utility package: Yucca Mountain Project

    SciTech Connect

    Yarrington, L.

    1990-02-01

    A VAX/VMS Mapped Section/Virtual Memory Utility Package is a collection of FORTRAN subprograms that allocate virtual memory and, optionally, map that memory to a file. The subprograms use VMS system services and run-time libraries for allocating and mapping memory; therefore, the utility package is system dependent and functional on that platform only. FORTRAN-77 is one of the most widely used languages for computer programming. Languages have been developed in the past few decades that provide more powerful tools than FORTRAN and overcome some of its limitations. Two limitations addressed by this paper which have been a source of frustration to many programmers are that (1) FORTRAN does not provide dynamic array allocation and (2) FORTRAN file input-output is very slow. The solutions presented here are for the VAX/VMS operating system and use system services that are not part of the standard FORTRAN language description. Also discussed in this paper are dynamic array allocation, mapped sections of the program memory, and support modules. 3 refs.

  13. Decontamination and dismantlement of the JANUS Reactor at Argonne National Laboratory-East. Project final report

    SciTech Connect

    Fellhauer, C.R.; Clark, F.R.; Garlock, G.A.

    1997-10-01

    The decontamination and dismantlement of the JANUS Reactor at Argonne National Laboratory-East (ANL-E) was completed in October 1997. Descriptions and evaluations of the activities performed and analyses of the results obtained during the JANUS D and D Project are provided in this Final Report. The following information is included: objective of the JANUS D and D Project; history of the JANUS Reactor facility; description of the ANL-E site and the JANUS Reactor facility; overview of the D and D activities performed; description of the project planning and engineering; description of the D and D operations; summary of the final status of the JANUS Reactor facility based upon the final survey results; description of the health and safety aspects of the project, including personnel exposure and OSHA reporting; summary of the waste minimization techniques utilized and total waste generated by the project; and summary of the final cost and schedule for the JANUS D and D Project.

  14. BMDO: New Mexico Technology Transfer Demonstration Project. Interim final report

    SciTech Connect

    Not Available

    1993-11-01

    The BMDO-New Mexico Technology Transfer Demonstration Project(BMDO-NM) was a collaborative effort among the national laboratories to identify and evaluate the commercial potential of selected SDI-funded technologies. The project was funded by BMDO (formerly known as the Strategic Defense Initiative Office or SDIO), the Technology Enterprise Division (NM-TED) of the NM Economic Development Division, and the three National Laboratories. The project was managed and supervised by SAGE Management Partners of Albuquerque, and project funding was administered through the University of New Mexico. The BMDO-NM Demonstration Project focused on the development of a process to assist technology developers in the evaluation of selected BMDO technology programs so that commercialization decisions can be made in an accelerated manner. The project brought together BMDO, the NM-TED, the University of New Mexico, and three New Mexico Federal laboratories -- Los Alamos (DOE), Phillips (DOD) and Sandia (DOE). Each national laboratory actively participated throughout the project through its technology transfer offices. New Mexico was selected as the site for the Demonstration Program because of its three national and federal research laboratories engaged in BMDO programs, and the existing relationship among state govemment, the labs, universities and local economic development and business assistance organizations. Subsequent Commercialization and Implementation phases for the selected technologies from LANL and SNL were completed by SAGE and the Project Team. Funding for those phases was provided by the individual labs as well as BMDO and NM-TED in kind services. NM-TED played a proactive role in this New Mexico partnership. Its mandate is to promote technology-based economic development, with a commitment to facilitate the use of technology by industry and business statewide. TED assumed the role of program manager and executing agent for BMDO in this demonstration project.

  15. Final report on LDRD project "proliferation-resistant fuel cycles"

    SciTech Connect

    Brown, N W; Hassberger, J A

    1999-02-25

    This report provides a summary of LDRD work completed during 1997 and 1998 to develop the ideas and concepts that lead to the Secure, Transportable, Autonomous Reactor (STAR) program proposals to the DOE Nuclear Energy Research Initiative (NERI). The STAR program consists of a team of three national laboratories (LLNL, ANL, and LANL), three universities, (UC Berkeley, TAMU, and MIT) and the Westinghouse Research Center. Based on the LLNL work and their own efforts on related work this team prepared and integrated a package of twelve proposals that will carry the LDRD work outlined here into the next phase of development. We are proposing to develop a new nuclear system that meets stringent requirements for a high degree of safety and proliferation resistance, and also deals directly with the related nuclear waste and spent fuel management issues.

  16. Keweenaw Bay Indian Community Weatherization Training Project Final Report

    SciTech Connect

    Denomie, Lawrence J.; LaPointe, Bruce

    2012-03-26

    The objective of the project is to train the appropriate staff, both new and existing from various KBIC Departments in the core competencies needed to develop a comprehensive Tribal community weatherization program. The goal of the project was to build the staff capacity to enable the KBIC to establish a Tribal weatherization program that promotes energy sufficiency throughout the Tribal community. The project addresses the needs identified in the 2008 KBIC Strategic Energy Plan to build the staff capacity and increase the knowledge base within the Tribal Departments and to implement an energy efficiency program through community education and financial assistance incentives.

  17. Austin Children`s Museum ``Go Power`` project. Final report

    SciTech Connect

    Not Available

    1993-10-01

    Go Power, was conceived as an interactive exhibit and related set of activities designed to promote in children and families an understanding and appreciation of energy concepts. Planned in 1990, the project culminated its first phase of activities with colorful, interactive exhibit about the pathways and transformations of energy, on display at the Austin Children`s Museum between February 5th and June 6th, 1993. The project was supported by the US Department of Energy, the National Science Foundation, the Lower Colorado River Authority and various local foundations and businesses. This report describes the process, product and outcomes of this project.

  18. Final Report for Project FG02-05ER25685

    SciTech Connect

    Xiaosong Ma

    2009-05-07

    In this report, the PI summarizes the results and achievements obtained in the sponsored project. Overall, the project has been very successful and produced both research results in massive data-intensive computing and data management for large scale supercomputers today, and in open-source software products. During the project period, 14 conference/journal publications, as well as two PhD students, have been produced due to exclusive or shared support from this award. In addition, the PI has recently been granted tenure from NC State University.

  19. 78 FR 13660 - Middle Fork American River Project; Notice of Availability of the Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-28

    ... Energy Regulatory Commission Middle Fork American River Project; Notice of Availability of the Final Environmental Impact Statement for the Middle Fork American River Hydrolectric Project In accordance with the... Projects has reviewed the application for license for the Middle Fork American River Hydroelectric...

  20. Staff Helping Attain Relevant Education (Project SHARE): Final Evaluation Report, 1992-93. OREA Report.

    ERIC Educational Resources Information Center

    Ranadive, Jyoti

    Project SHARE (Staff Helping Attain Relevant Education), a project funded by Title VII of the Elementary and Secondary Education Act, was in its third and final year of operation in 1992-93, in eight primary schools in the Bronx, Brooklyn, and Manhattan (New York). The project served 141 limited English proficient students from low-income families…

  1. Project I-TIP: Inservice Training for Infant Personnel. Final Report.

    ERIC Educational Resources Information Center

    Freund, Maxine; Rab, Victoria Y.

    This final report describes Project I-TIP (Inservice Training for Infant Personnel), a 3-year project which developed and demonstrated a comprehensive model of inservice training for personnel serving children with handicaps (ages 0-5 years). Specifically the project provided training at 17 sites to over 900 individuals. Training protocols were…

  2. Legacy sample disposition project. Volume 2: Final report

    SciTech Connect

    Gurley, R.N.; Shifty, K.L.

    1998-02-01

    This report describes the legacy sample disposition project at the Idaho Engineering and Environmental Laboratory (INEEL), which assessed Site-wide facilities/areas to locate legacy samples and owner organizations and then characterized and dispositioned these samples. This project resulted from an Idaho Department of Environmental Quality inspection of selected areas of the INEEL in January 1996, which identified some samples at the Test Reactor Area and Idaho Chemical Processing Plant that had not been characterized and dispositioned according to Resource Conservation and Recovery Act (RCRA) requirements. The objective of the project was to manage legacy samples in accordance with all applicable environmental and safety requirements. A systems engineering approach was used throughout the project, which included collecting the legacy sample information and developing a system for amending and retrieving the information. All legacy samples were dispositioned by the end of 1997. Closure of the legacy sample issue was achieved through these actions.

  3. Final Report - Navajo Electrification Demonstration Project - FY2004

    SciTech Connect

    Kenneth L. Craig, Interim General Manager

    2007-03-31

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year projects which addresses the needs of unserved Navajo Nation residents without basic electricity services. The Navajo Nation is the United States' largest tribe, in terms of population and land. An estimated 18,000 Navajo Nation homes do not have basic grid-tied electricity--and this third year of funding, known as NEDP-3, provided 351 power line extensions to Navajo families.

  4. Final Project Report: A Polyhedral Transformation Framework for Compiler Optimization

    SciTech Connect

    Sadayappan, Ponnuswamy; Rountev, Atanas

    2015-06-15

    The project developed the polyhedral compiler transformation module PolyOpt/Fortran in the ROSE compiler framework. PolyOpt/Fortran performs automated transformation of affine loop nests within FORTRAN programs for enhanced data locality and parallel execution. A FORTAN version of the Polybench library was also developed by the project. A third development was a dynamic analysis approach to gauge vectorization potential within loops of programs; software (DDVec) for automated instrumentation and dynamic analysis of programs was developed.

  5. Newberry Geothermal Pilot Project : Final Environmental Impact Statement.

    SciTech Connect

    US Forest Service; US Bureau of Land Management; US Bonneville Power Administration

    1994-09-01

    BPA has decided to acquire 20 average megawatts (aMW) of electrical power from a privately-owned geothermal power plant on the west flank of Newberry Volcano in Deschutes County, Oregon. The Newberry Project will generate 30 aMW and will be developed, owned, and operated by CE Newberry, Inc. of Portland, Oregon. In addition, BPA has decided to grant billing credits to EWEB for 10 aMW of electrical power and to provide wheeling services to EWEB for the transmission of this power to their system. BPA expects the Newberry Project to be in commercial operation by November 1997. BPA has statutory responsibilities to supply electrical power to its utility industrial and other customers in the Pacific Northwest. The Newberry Project will be used to meet the electrical power supply obligations of these customers. The Newberry Project will also demonstrate the availability of geothermal power to meet power supply needs in the Pacific Northwest and is expected to be the first commercial geothermal plant in the region. The Newberry Project was selected under the BPA Geothermal Pilot Project Program. The goal of the Program is to initiate development of the Pacific Northwest`s large, but essentially untapped, geothermal resources, and to confirm the availability of this resource to meet the energy needs of the region. The primary underlying objective of this Program is to assure the supply of alternative sources of electrical power to help meet growing regional power demands and needs.

  6. PROJECT STEPS: Sequenced Transition to Education in the Public Schools. National Outreach Project. Final Evaluation Report, 1996-1999.

    ERIC Educational Resources Information Center

    Hemmeter, Mary Louise; Schuster, John

    This final report discusses the outcomes of Project STEPS (Sequenced Transition to Education in the Public Schools), an outreach project designed to provide training and technical assistance to states and territories in the development of a statewide transition system for children with disabilities, birth through 5 years of age. The focus of the…

  7. OECD MCCI project final report, February 28, 2006.

    SciTech Connect

    Farmer, M. T.; Lomperski, S.; Kilsdonk, D. J.; Aeschlimann, R. W.; Basu, S.

    2011-05-23

    -dimensional. Although the MACE Scoping Test was carried out with a two-dimensional concrete cavity, the interaction was flooded soon after ablation was initiated to investigate debris coolability. Moreover, due to the scoping nature of this test, the apparatus was minimally instrumented and therefore the results are of limited value from the code validation viewpoint. Aside from the MACE program, the COTELS test series also investigated 2-D CCI under flooded cavity conditions. However, the input power density for these tests was quite high relative to the prototypic case. Finally, the BETA test series provided valuable data on 2-D core concrete interaction under dry cavity conditions, but these tests focused on investigating the interaction of the metallic (steel) phase with concrete. Due to these limitations, there is significant uncertainty in the partitioning of energy dissipated for the ablation of concrete in the lateral and axial directions under dry cavity conditions for the case of a core oxide melt. Accurate knowledge of this 'power split' is important in the evaluation of the consequences of an ex-vessel severe accident; e.g., lateral erosion can undermine containment structures, while axial erosion can penetrate the basemat, leading to ground contamination and/or possible containment bypass. As a result of this uncertainty, there are still substantial differences among computer codes in the prediction of 2-D cavity erosion behavior under both wet and dry cavity conditions. Thus, a second key aim of the current program was to provide the necessary data to help resolve these modeling differences. In light of the above issues, the OECD-sponsored Melt Coolability and Concrete Interaction (MCCI) program was initiated at Argonne National Laboratory. The project conducted reactor materials experiments and associated analysis to achieve the following technical objectives: (1) resolve the ex-vessel debris coolability issue through a program that focused on providing both confirmatory

  8. Eckerd College Energy Systems Project. Final technical report

    SciTech Connect

    DeGroot, D.E.

    1984-02-06

    The Eckerd College Energy Systems Project (ESP) consisted of four interrelated components: Organic gardening; Aquaculture (Tilapia); Methane gas conversion and utilization as energy source to drive an electric generator; Solar water heating component. These components were designed to demonstrate the feasibility of using alternative technologies to reduce petro-chemical energy dependency, to provide faculty and staff with hands-on A.T. experience, and to involve the general community in A.T. energy experiences. The Organic, Aquaculture and Solar components were successful. The Methane project was not. The educational goals of the project were met or exceeded. It is strongly recommended that DOE/AT support ESP like programs at all educational levels as part of our national commitment to developing an increasing capability for energy self sufficiency in the general population.

  9. UMTRA Surface Project management action process document: Final. Revision 2

    SciTech Connect

    1996-06-01

    Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designed sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project. Since its inception through March 1996, the Surface Project (hereinafter called the Project) has cleaned up 16 of the 24 designated processing sites and approximately 5,000 VPs, reducing the risk to human health and the environment posed by the uranium mill tailings. Two of the 24 sites, Belfield and Bowman, North Dakota, will not be remediated at the request of the state, reducing the total number of sites to 22. By the start of FY1998, the remaining 6 processing sites and associated VPs will be cleaned up. The remedial action activities to be funded in FY1998 by the FY1998 budget request are remediation of the remaining Grand Junction, Colorado, VPs; closure of the Cheney disposal cell in Grand Junction, Colorado; and preparation of the completion reports for 4 completed sites.

  10. Final Reclamation Report: Basalt Waste Isolation Project exploratory shaft site

    SciTech Connect

    Brandt, C.A.; Rickard, W.H. Jr.

    1990-06-01

    The restoration of areas disturbed by activities of the Basalt Waste Isolation Project (BWIP) constitutes a unique operation at the US Department of Energy's (DOE) Hanford Site, both from the standpoint of restoration objectives and the time frame for accomplishing these objectives. The BWIP reclamation program comprises three separate projects: borehole reclamation, Near Surface Test Facility (NSTF) reclamation, and Exploratory Shaft Facility (ESF) reclamation. The main focus of this report is on determining the success of the revegetation effort 1 year after work was completed. This report also provides a brief overview of the ESF reclamation program. 21 refs., 7 figs., 14 tabs.

  11. FY2003 LDRD Final Annual Report Article: Pathogen Pathway Project

    SciTech Connect

    Fitch, J P; McCutchen-Maloney, S L

    2003-11-10

    Understanding virulence mechanisms of bacterial pathogens is vital to anticipating biological threats and to improving detectors, vaccines, and treatments. This project will characterize factors responsible for virulence of Yersinia pestis, the causative agent of plague and a biothreat agent, which has an inducible Type III secretion virulence mechanism also found in other animal, plant, and human pathogens. Our approach relies on genomic and proteomic characterization of Y. pestis in addition to a bioinformatic infrastructure. Scientific and technical capabilities developed in this project can be applied to other microbes of interest. This work will establish a significant new direction for biodefense at LLNL and expand our national and international scientific collaborations.

  12. Final Report for NA-22/DTRA Cosmic Ray Project

    SciTech Connect

    Wurtz, Ron E.; Chapline, George F.; Glenn, Andrew M.; Nakae, Les F.; Pawelczak, Iwona A.; Sheets, Steven A.

    2015-07-21

    The primary objective of this project was to better understand the time-correlations between the muons and neutrons produced as a result of high energy primary cosmic ray particles hitting the atmosphere, and investigate whether these time correlations might be useful in connection with the detection of special nuclear materials. During the course of this project we did observe weak correlations between secondary cosmic ray muons and cosmic ray induced fast neutrons. We also observed strong correlations between tertiary neutrons produced in a Pb pile by secondary cosmic rays and minimum ionizing particles produced in association with the tertiary neutrons.

  13. Phase II: Final Report. Northern New Mexico Energy Education Project.

    ERIC Educational Resources Information Center

    New Mexico Highlands Univ., Las Vegas.

    Objectives of the Northern New Mexico Energy Education Project were to: (1) improve teachers' knowledge of energy-related subject matter and energy-related educational materials; (2) develop continuing communication and cooperation between elementary and junior high staffs and the university on energy-related matters; and (3) provide follow-up…

  14. Project EXCEL: Hotel Workers Literacy Enhancement Program. Final Performance Report.

    ERIC Educational Resources Information Center

    Career Resources Development Center, Inc., San Francisco, CA.

    Project EXCEL is a federally-funded workplace literacy program involving hotel enterprises in the San Francisco (California) Bay area. Its focus is on identification and instruction of literacy skills essential to job success for limited-English-proficient (LEP) workers. Training is intended to enable employees to understand written work orders,…

  15. Hospitality Occupational Skills Training Cooperative. Project HOST Final Report.

    ERIC Educational Resources Information Center

    Northwest Educational Cooperative, Des Plaines, IL.

    Project HOST (Hospitality Occupational Skills Training) provided vocational training and employment opportunities in the hotel industry to disadvantaged adult minority populations in Chicago. It demonstrated a model for successful cooperation between the business sector and a public vocational education agency and developed and piloted a…

  16. Projecting Labor Requirements for Transportation-Related Construction. Final Report.

    ERIC Educational Resources Information Center

    Washington Technical Inst., Washington, DC. Center for Urban Services.

    This report examines the urban transportation planning process and its labor market impact, including projections of opportunities for minority participation in construction, operation, and maintenance of a transportation system and forecasts of training needed in critical occupations. It was found that transportation-related construction may be…

  17. The Future of Work. Curriculum Development Project. Final Report.

    ERIC Educational Resources Information Center

    Center for New Work of Flint, MI.

    The Future of Work project grew out of an essay of the same title by Frithjof Bergmann, a philosophy professor at the University of Michigan. In spring 1983, Professor Bergmann and a colleague, Richard Gull, founded the Center for New Work of Flint in Michigan, where the problems besieging the U.S. auto industry were focusing attention on the…

  18. The Community Service Fellowship Planning Project: Final Report.

    ERIC Educational Resources Information Center

    McKee, Robert L.; Gaffney, Michael J.

    This report describes the findings and recommendations of the Community Service Fellowship (CSF) Planning Project conducted by the American Association of Community and Junior Colleges under a grant from ACTION, the federal agency charged with promoting volunteer service. The proposed CSF program is a means of providing young people with…

  19. Related Reading and Mathematics Project. Final Report, 1981-82.

    ERIC Educational Resources Information Center

    Monmouth County Vocational School District, Marlboro, NJ.

    A project was conducted in the Monmouth County (New Jersey) Vocational School District to examine the combination of in-shop vocational education with reading and mathematics instruction for special needs students. Related mathematics and reading teachers worked with students in small groups and individualized settings in the school shop to teach…

  20. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    SciTech Connect

    Not Available

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  1. Driver Aid and Education Test Project. Final Report.

    ERIC Educational Resources Information Center

    Shadis, W.; Soucek, S. J.

    A driver education project tested the hypothesis that measurable improvements in fleet fuel economy can be achieved by driver awareness training in fuel-efficient driving techniques and by a manifold vacuum gauge, used individually or in combination with each other. From April 1976 through December 1977 data were collected in the Las Vegas,…

  2. Urban Options Solar Greenhouse Demonstration Project. Final report

    SciTech Connect

    Cipparone, L.

    1980-10-15

    The following are included: the design process, construction, thermal performance, horticulture, educational activities, and future plans. Included in appendices are: greenhouse blueprints, insulating curtain details, workshop schedules, sample data forms, summary of performance calculations on the Urban Options Solar Greenhouse, data on vegetable production, publications, news articles on th Solar Greenhouse Project, and the financial statement. (MHR)

  3. Portland Peers Project. 1989-91 Final Evaluation Report.

    ERIC Educational Resources Information Center

    Mitchell, Stephanie

    This evaluation report describes a program designed to reduce substance abuse among students by establishing a comprehensive peer program in the middle schools (grades 6 through 8). The background of the project is reviewed, five important aspects of a peer helper program are listed, and three intervention strategies of peer assistance programs…

  4. Project Upper Cumberland, Title III ESEA. Final Report.

    ERIC Educational Resources Information Center

    Khanna, J. L.; And Others

    Project Upper Cumberland--serving 16 Tennessee counties from July 1, 1967 through September 30, 1970--sponsored a teachers' inservice program emphasizing human relations training, a cultural arts program (grades 1-12), and a guidance and counseling program (grades 1-9). All 3 programs had the general goal of changing and improving attitudes and…

  5. The Chicago JOBS Labor Mobility Project. Final Report.

    ERIC Educational Resources Information Center

    Helfer, Charles

    The purpose of the project was to relocate young, poor, unemployed Negroes from the inner core of Chicago to outlying suburban communities in order to provide greater upward mobility. Most were to have completed a JOBS (Job Opportunities Through Better Skills) program of prevocational counseling and skill training. (Author)

  6. Horological and Micro-Precision Project. Final Report.

    ERIC Educational Resources Information Center

    Dobrovolny, Jerry S.; And Others

    The purposes of the project were (1) to establish better methods of training technicians for the horological and industrial fields, (2) to encourage more young people to investigate horological and micro-precision work as a career, (3) to train a group of students who would be employable in diverse horological and industrial areas, and (4) to help…

  7. Working Smart: The Los Angeles Workplace Literacy Project. Final Report.

    ERIC Educational Resources Information Center

    Los Angeles Unified School District, CA. Div. of Adult and Occupational Education.

    The Working Smart workplace literacy project was sponsored by a public school district and several profit and nonprofit companies and conducted for the hotel and food industry in the Los Angeles area. Literacy instruction was merged with job requirements of the customer service job classifications. Videodisc courseware was developed, as were…

  8. Small Business Consortium: Research Project in Vocational Education. Final Report.

    ERIC Educational Resources Information Center

    Belcher, Jacquelyn; Hutchison, Kae R.

    Five community colleges and two vocational technical institutes located in King County, Washington, together with the Washington State Department of Employment Security, undertook a research project to (1) collect nationally available information on current research and successful practices in assistance to small businesses; (2) conduct a survey…

  9. Adult Basic Education Outreach Project. Final Report (Executive Summary).

    ERIC Educational Resources Information Center

    Alberta Vocational Centre, Edmonton.

    An executive report summarizes the Alberta Vocational Centre's development of a portable individualized, competency-based learning system for use in an adult basic education program in a non-institutional community location. The report deals with the project's rationale, development (including management, curricular development, budget, and site…

  10. Gypsy Field project in reservoir characterization. Final report

    SciTech Connect

    O`Meara, Jr., D. J.

    1997-05-01

    The overall objective of this project is to use the extensive Gypsy Field laboratory and data set as a focus for developing and testing reservoir characterization methods that are targeted at improved recovery of conventional oil. The Gypsy Field laboratory consists of coupled outcrop and subsurface sites which have been characterized to a degree of detail not possible in a production operation. Data from these sites entail geological descriptions, core measurements, well logs, vertical seismic surveys, a 3D seismic survey, crosswell seismic surveys, and pressure transient well tests. The overall project consists of four interdisciplinary sub-projects which are closely interlinked: modeling depositional environments; sweep efficiency; tracer testing; and integrated 3D seismic interpretation. The first of these aims at improving the ability to model complex depositional environments which trap movable oil. The second is a development geophysics project which proposes to improve the quality of reservoir geological models through better use of 3D seismic data. The third investigates the usefulness of a new numerical technique for identifying unswept oil through rapid calculation of sweep efficiency in large reservoir models. The fourth explores what can be learned from tracer tests in complex depositional environments, particularly those which are fluvial dominated.

  11. WRP: Final Report on Vermont's Welfare Restructuring Project.

    ERIC Educational Resources Information Center

    Scrivener, Susan; Hendra, Richard; Redcross, Cindy; Bloom, Dan; Michalopoulos, Charles; Walter, Johanna

    An evaluation was conducted of Vermont's Welfare Restructuring Project (WRP), one of the earliest statewide welfare reform programs designed to increase work and reduce reliance on welfare. To assess the difference WRP made, parents applying for or receiving cash assistance in Vermont from July 1994 to December 1996 were assigned randomly to one…

  12. Collaborative Project on Serving Linguistically Diverse Seniors. Final Report.

    ERIC Educational Resources Information Center

    Burt, Miriam

    In 2002, the Center for Applied Linguistics (CAL) collaborated with the Senior Service Association (SSA) and the American Society on Aging (ASA) on a two-phase project to improve the effectiveness of ASA's sub-grantees in serving linguistically and culturally diverse populations. SSA provides subsidized employment for low-income seniors and funds…

  13. Tech Prep Intergenerational Curriculum Development Project. Final Report.

    ERIC Educational Resources Information Center

    Texas Tech Univ., Lubbock.

    A project to develop a competency-based curriculum to support implementation of tech prep intergenerational programs throughout Texas was begun in summer 1992. A preliminary career ladder for intergenerational occupations was composed and revised. A task analysis was conducted. A survey to which 285 of the 547 health care professionals, secondary…

  14. [Wisconsin] Research and Development Project in Career Education: Final Report.

    ERIC Educational Resources Information Center

    Lehrmann, Eugene I.

    The K-Adult research and development project in career education in Eau Claire, Wisconsin, contained two phases: (1) Eau Claire Joint School District Five, introducing the 16 Wisconsin career development concepts into school curricula through teacher workshops, resource materials, public relations, and consulting services for classroom teachers…

  15. Leech Lake American Indian Foster Care Project 1978. Final Report.

    ERIC Educational Resources Information Center

    Walker and Associates, Inc., Minneapolis, Minn.

    In its second year the project continued to attempt to reduce the incidence of separation of Indian children from their families and to establish permanent planning for those children who were removed, thus improving the child welfare services to Minnesota Chippewa Indian children and families on the Leech Lake Reservation through direct foster…

  16. Project PALS (Parenting and Literacy Skills). Final Report.

    ERIC Educational Resources Information Center

    Bryan Independent School District, TX.

    Project PALS (Parenting and Literacy Skills) was designed as a model of holistic comprehensive family literacy for those families connected with a Head Start program. Forty-three of an anticipated 75 families were served. Adult students who were referred by Head Start personnel participated in classes in English as a Second Language, Adult Basic…

  17. Project REAL Evaluation: Final Report 1999-2000 School Year.

    ERIC Educational Resources Information Center

    Howley, Craig

    Project REAL (Rural Education Aligned for Learning) aims to improve mathematics and science education in grades 5-8 in five rural Ohio school districts identified as in "academic emergency" or on "academic watch." Program goals are to reform curricula to teach skills and concepts, rather than facts; improve students' math and science competencies;…

  18. Victorias energy efficiency and cogeneration project. Final report

    SciTech Connect

    1998-10-31

    This report describes a two-phase energy project currently contemplated for joint implementation at the Victorias Milling Company, a large sugar mill and refinery on the island of Negros in the Visayas region of the Philippines. The Energy Efficiency (EE) phase is expected to reduce of eliminate VMC`s fossil fuel consumption, which will have a direct and substantial impact on carbon emissions. Phase I is an EE project which involves the installation of equipment to reduce steam and electricity demand in the factories. Phase II, will involve retrofitting and increasing the capacity of the steam and power generation systems, and selling power to the grid. By increasing efficiency and output, the cogeneration project will allow the factory to use only bagasse sugar cane fiber waste as fuel for energy needs. The cogeneration project will also eliminate VMC`s electricity purchases and supply additional power for the island, which will offset generation capacity expansion on the island and the Visayas region.

  19. Final Technical Report for Terabit-scale hybrid networking project.

    SciTech Connect

    Veeraraghavan, Malathi

    2015-12-12

    This report describes our accomplishments and activities for the project titled Terabit-Scale Hybrid Networking. The key accomplishment is that we developed, tested and deployed an Alpha Flow Characterization System (AFCS) in ESnet. It is being run in production mode since Sept. 2015. Also, a new QoS class was added to ESnet5 to support alpha flows.

  20. Final Report of the Vocational Assessment Project, 1979-80.

    ERIC Educational Resources Information Center

    Rutgers, The State Univ., New Brunswick, NJ. School of Medicine.

    To improve vocational rehabilitation programs for schizophrenic persons, a project sought to design an effective assessment strategy. Inactive records of schizophrenic clients at New Jersey sheltered workshops were examined to determine validity and reliability of assessment instruments being used. General Aptitude Test Battery (GATB) profiles of…

  1. Final report of Project 617, the Energy Saver

    SciTech Connect

    1996-12-31

    The Project work was begun in January of 1995 and was completed in May of 1996. The authors performed a broad value engineering study to examine all parts and functions to lower costs, improve functioning and safety. The results of the Phase 1 work was a total redesign of the original Energy Saver resulting in two components instead of three, a weight of four pounds versus the original fourteen pounds and a reduction from 21 pieces to 10 pieces. The manufactured cost dropped from $350 to $175. Based on these improvements the Value Improvement Project has been successful. The second generation unit was named the BROIL-MASTER and has been registered under the Provisional Application (Patent) Program. The authors performed a technical analysis to determine the potential energy savings of applications identified and collect data on host product gas consumption, payback period, and other cost/saving relationships. The industrial search for energy project applications for the authors design was not successful. Seven Broil-Master demonstration projects have been successfully completed. The Broil-Master has received certification from the American Gas Association and UL approval is due by the end of July. The Restaurant Equipment Test Center of Pacific Gas and Electric is interested in testing the Broil-Master sometime in 1996. The Broil-Master was shown at an International Restaurant Equipment Show in September, 1995 and the National Restaurant Show in May, 1996. The authors now have under way four tests with chains and several other tests pending.

  2. Understanding Equilibrium: The Study of Complex Systems. Final Project Report.

    ERIC Educational Resources Information Center

    Duckworth, Eleanor; And Others

    The Educational Technology Center (ETC) Complex Systems Project was initiated to explore ways of using computers to help students understand systems which have often proven too complex for most high school students to understand. Preliminary work concentrated on the cognitive processes involved in modeling simple systems. This paper describes an…

  3. Project VITAL. Final Financial Status and Performance Report.

    ERIC Educational Resources Information Center

    Ellison, Arthur

    In its third year of funding, Project VITAL (Volunteers In Training Act and Learn) was designed to provide literacy training to 500 librarians, coordinators, and volunteers working in literacy programs. Through the techniques of improvisational theater, structured scenarios were enacted dealing with illiteracy, women's concerns of domestic…

  4. The Social Ecology Research Project, 1988-1991. Final Report.

    ERIC Educational Resources Information Center

    Coleman, J. Michael; Minnett, Ann M.

    This report describes the Social Ecology Research Project, which assessed the foundations of personal-social competence in children with mental handicaps (MH). Children with mild MH (n=1,200) and their normally achieving peers (n=2,500), all ages 8-14, were studied over 3 years. Students were assessed in resource and regular classrooms, and…

  5. Evaluation of the Attendant Care Pilot Project. Final Report.

    ERIC Educational Resources Information Center

    Clark, Anne; Faragher, Jean

    An Attendant Care Pilot Project, administered by the Home Care Service of New South Wales, Australia, and providing attendant care for 24 permanently severely physically disabled adults for 2 years, was evaluated. The patients were medically stable and intellectually capable of managing their own affairs; all had impairments which required…

  6. An International Comparison of Final-Year Design Project Curricula

    ERIC Educational Resources Information Center

    Kentish, Sandra E.; Shallcross, David C.

    2006-01-01

    This paper reviews design teaching at a total of 15 chemical engineering departments across Australia, Singapore, and the United Kingdom. The emphasis is on the capstone Design Project, which can be viewed as a major transition subject for students as they move into the workplace. The study shows that this subject has evolved to act as an…

  7. Skills Conversion Project, Chapter 8, Pollution Control. Final Report.

    ERIC Educational Resources Information Center

    National Society of Professional Engineers, Washington, DC.

    The Skills Conversion Project conducted by the National Society of Professional Engineers sought to study the transition mechanisms required to transfer available technical manpower from aerospace and defense industries into other areas of employment in private industry and public service. Fourteen study teams assessed the likelihood of future…

  8. Rural Improvement Project (RIP). [Summary and Final Evaluation Report.

    ERIC Educational Resources Information Center

    Yvon, Bernard R., Comp.

    The aim of the Rural Improvement Project of Maine from Spring, 1969-Fall, 1970 was to improve the quality of rural education through an innovative attempt to utilize specialized, trained personnel (Cooperating Rural Resource Teachers; associate teachers; teacher aides; 3 undergraduate teachers; and an elementary guidance counselor) and to…

  9. Project ESL/Careers Curriculum. Final Report 1983-1984.

    ERIC Educational Resources Information Center

    Atlantic Community Coll., Mays Landing, NJ.

    This curriculum guide was developed at Atlantic Community College as part of a program to facilitate the training of persons with limited English-speaking ability for jobs, especially jobs in Atlantic City casinos. The project aimed to teach job skills and life coping skills along with English. The curriculum guide contains 10 units. Approximately…

  10. Trade and Industry Articulation Project: Final Report, 1981-82.

    ERIC Educational Resources Information Center

    Stewart, Betsy; And Others

    A project was undertaken at Cerritos College (CC) to establish a statewide model for the development of articulated trade and industry curriculum materials and methods that would allow students to move from the secondary to the college level without loss of time or resources. Six subject areas were chosen: auto body, automotive, drafting,…

  11. Rural Workplace Literacy Project: Northern California. Final Report.

    ERIC Educational Resources Information Center

    California Human Development Corp.

    The California Human Development Corporation's Rural Workplace Literacy Project (RWLP) provided migrant and seasonal farmworkers with on-site workplace literacy training designed to enhance their ability to develop job skills. During 1990-91, it provided literacy classes at 15 agricultural worksites and enrolled 282 farmworkers. Of students…

  12. Foreign Language/Area Studies Enhancement Project. Final Report.

    ERIC Educational Resources Information Center

    Felker, William; Fuller, Clark

    The Foreign Language/Area Studies Enhancement Program at Central State University (Ohio) is an experience-centered work and study program in Africa designed to give students training in language, culture, and technology. It parallels and supports the university's northern Senegal water management project designed to promote self-sufficiency among…

  13. Project for Evaluating the Benefits from University Libraries. Final Report.

    ERIC Educational Resources Information Center

    Durham Univ. (England).

    The objective of the project was to develop a method of measuring benefits, to provide criterion functions for quantitative planning in university libraries. The approach chosen was to show what benefit estimates lie behind actual qualitative planning decisions and to build them into exact planning models. The chapters include: library products…

  14. Mt. Hood Tech Prep Demonstration Project. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Owens, Thomas R.

    The Mt. Hood Tech Prep Demonstration Project provides technical education to students in grades 9-14 plus opportunities to continue into apprenticeship or four-year college programs. The consortium includes seven Oregon local school districts, Mt. Hood Community College (MHCC), and active business and industry partners. An estimated 1,500 students…

  15. Albeni Falls Wildlife Mitigation Project; Idaho Department of Fish and Game 2007 Final Annual Report.

    SciTech Connect

    Cousins, Katherine

    2009-04-03

    The Idaho Department of Fish and Game maintained a total of about 2,743 acres of wildlife mitigation habitat in 2007, and protected another 921 acres. The total wildlife habitat mitigation debt has been reduced by approximately two percent (598.22 HU) through the Department's mitigation activities in 2007. Implementation of the vegetative monitoring and evaluation program continued across protected lands. For the next funding cycle, the IDFG is considering a package of restoration projects and habitat improvements, conservation easements, and land acquisitions in the project area.

  16. Giving back to donor families: the "thank you letter" package insert project.

    PubMed

    Colarusso, Cynthia

    2006-03-01

    Family members of organ donors receive anonymous information about the transplant recipients. Also, they often receive written communication from the recipients themselves and or the recipient's family members, expressing gratitude for the generous gifts they donated. The feedback received by donor families serves to affirm that their altruistic decision to donate life-saving and life-enhancing gifts has saved or dramatically improved the lives of the recipients. Feedback allows donor families to assign meaning to the donation itself and make some sense of otherwise tragic circumstances. In contrast, family members of bone and soft tissue donors historically have not received the same level of feedback provided to the family members of organ donors. The tissue banking community, as an extension of the procurement community that provides care to tissue donor families, is in a unique position to facilitate meaningful feedback between bone and soft tissue donor families and their recipients. This article explores the use of tissue packaging as a communication portal to solicit and facilitate the needed feedback loop between bone and soft tissue donor families and their recipients. PMID:16676679

  17. A Learning Package in Energy Conservation for Participants in the Home Building Industry. Appendices.

    ERIC Educational Resources Information Center

    Houston Univ., TX. College of Architecture.

    This document presents the appendices for the final research report for a project designed to produce an experimental learning package in energy conservation for members of the home building industry. (SL)

  18. The INTERGROWTH-21st Project Neurodevelopment Package: A Novel Method for the Multi-Dimensional Assessment of Neurodevelopment in Pre-School Age Children

    PubMed Central

    Fernandes, Michelle; Stein, Alan; Newton, Charles R.; Cheikh-Ismail, Leila; Kihara, Michael; Wulff, Katharina; de León Quintana, Enrique; Aranzeta, Luis; Soria-Frisch, Aureli; Acedo, Javier; Ibanez, David; Abubakar, Amina; Giuliani, Francesca; Lewis, Tamsin; Kennedy, Stephen; Villar, Jose

    2014-01-01

    Background The International Fetal and Newborn Growth Consortium for the 21st Century (INTERGROWTH-21st) Project is a population-based, longitudinal study describing early growth and development in an optimally healthy cohort of 4607 mothers and newborns. At 24 months, children are assessed for neurodevelopmental outcomes with the INTERGROWTH-21st Neurodevelopment Package. This paper describes neurodevelopment tools for preschoolers and the systematic approach leading to the development of the Package. Methods An advisory panel shortlisted project-specific criteria (such as multi-dimensional assessments and suitability for international populations) to be fulfilled by a neurodevelopment instrument. A literature review of well-established tools for preschoolers revealed 47 candidates, none of which fulfilled all the project's criteria. A multi-dimensional assessment was, therefore, compiled using a package-based approach by: (i) categorizing desired outcomes into domains, (ii) devising domain-specific criteria for tool selection, and (iii) selecting the most appropriate measure for each domain. Results The Package measures vision (Cardiff tests); cortical auditory processing (auditory evoked potentials to a novelty oddball paradigm); and cognition, language skills, behavior, motor skills and attention (the INTERGROWTH-21st Neurodevelopment Assessment) in 35–45 minutes. Sleep-wake patterns (actigraphy) are also assessed. Tablet-based applications with integrated quality checks and automated, wireless electroencephalography make the Package easy to administer in the field by non-specialist staff. The Package is in use in Brazil, India, Italy, Kenya and the United Kingdom. Conclusions The INTERGROWTH-21st Neurodevelopment Package is a multi-dimensional instrument measuring early child development (ECD). Its developmental approach may be useful to those involved in large-scale ECD research and surveillance efforts. PMID:25423589

  19. Missouri Soybean Association Biodiesel Demonstration Project: Final Report

    SciTech Connect

    Ludwig, Dale; Hamilton, Jill

    2011-10-27

    The Missouri Soybean Association (MSA) and the National Biodiesel Board (NBB) partnered together to implement the MSA Biodiesel Demonstration project under a United States Department of Energy (DOE) grant. The goal of this project was to provide decision makers and fleet managers with information that could lead to the increased use of domestically produced renewable fuels and could reduce the harmful impacts of school bus diesel exhaust on children. This project was initiated in September 2004 and completed in April 2011. The project carried out a broad range of activities organized under four areas: 1. Petroleum and related industry education program for fuel suppliers; 2. Fleet evaluation program using B20 with a Missouri school district; 3. Outreach and awareness campaign for school district fleet managers; and 4. Support of ongoing B20 Fleet Evaluation Team (FET) data collection efforts with existing school districts. Technical support to the biodiesel industry was also provided through NBB’s Troubleshooting Hotline. The hotline program was established in 2008 to troubleshoot fuel quality issues and help facilitate smooth implementation of the RFS and is described in greater detail under Milestone A.1 - Promote Instruction and Guidance on Best Practices. As a result of this project’s efforts, MSA and NBB were able to successfully reach out to and support a broad spectrum of biodiesel users in Missouri and New England. The MSA Biodiesel Demonstration was funded through a FY2004 Renewable Energy Resources Congressional earmark. The initial focus of this project was to test and evaluate biodiesel blends coupled with diesel oxidation catalysts as an emissions reduction technology for school bus fleets in the United States. The project was designed to verify emissions reductions using Environmental Protection Agency (EPA) protocols, then document – with school bus fleet experience – the viability of utilizing B20 blends. The fleet experience was expected to

  20. Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

    SciTech Connect

    Taddeucci, Joe

    2013-03-29

    The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a

  1. Near-Site Transportation Infrastructure Project. Final report

    SciTech Connect

    Viebrock, J.M.; Mote, N.

    1992-02-01

    There are 122 commercial nuclear facilities from which spent nuclear fuel will be accepted by the Federal Waste Management System (FWMS). Since some facilities share common sites and some facilities are on adjacent sites, 76 sites were identified for the Near-Site Transportation Infrastructure (NSTI) project. The objective of the NSTI project was to identify the options available for transportation of spent-fuel casks from each of these commercial nuclear facility sites to the main transportation routes -- interstate highways, commercial rail lines and navigable waterways available for commercial use. The near-site transportation infrastructure from each site was assessed, based on observation of technical features identified during a survey of the routes and facilities plus data collected from referenced information sources. The potential for refurbishment of transportation facilities which are not currently operational was also assessed, as was the potential for establishing new transportation facilities.

  2. The Andromeda Project: Final Results of Citizen Science Cluster Identification

    NASA Astrophysics Data System (ADS)

    Seth, Anil; Johnson, L. C.; Wallace, M.; Dalcanton, J.; Kapadia, A.; Lintott, C.; Simpson, R.; Skillman, E. D.; PHAT Team; Andromeda Project Team

    2014-01-01

    The Panchromatic Hubble Andromeda Treasury (PHAT) survey has completed data collection, having taken over 30 billion pixels of imaging data of the Andromeda galaxy over four years using the Hubble Space Telescope. These data contain the largest sample of star clusters observable in any galaxy, including our own Milky Way. The Andromeda Project is a citizen science project that recruited over 10,000 volunteers to identify thousands of star clusters in the PHAT imaging. We present results culminating from two rounds of cluster searching and the properties of the resulting sample. We discuss catalog completeness results derived from synthetic cluster data. This cluster sample represents a significant advance in our ability to study star and cluster formation on galaxy wide scales. We are using the resulting cluster sample to provide the best available constraints on the high-mass initial mass function and the fraction of star formation that results in bound star clusters.

  3. Final project report: High energy rotor development, test and evaluation

    SciTech Connect

    1996-09-01

    Under the auspices of the {open_quotes}Government/Industry Wind Technology Applications Project{close_quotes} [{open_quotes}Letter of Interest{close_quotes} (LOI) Number RC-1-11101], Flo Wind Corp. has successfully developed, tested, and delivered a high-energy rotor upgrade candidate for their 19-meter Vertical Axis Wind Turbine. The project included the demonstration of the innovative extended height-to-diameter ratio concept, the development of a continuous span single-piece composite blade, the demonstration of a continuous blade manufacturing technique, the utilization of the Sandia National Laboratories developed SNLA 2150 natural laminar flow airfoil and the reuse of existing wind turbine and wind power plant infrastructure.

  4. Encoal mild coal gasification project: Final design modifications report

    SciTech Connect

    1997-07-01

    The design, construction and operation Phases of the Encoal Mild Coal Gasification Project have been completed. The plant, designed to process 1,000 ton/day of subbituminous Power River Basin (PRB) low-sulfur coal feed and to produce two environmentally friendly products, a solid fuel and a liquid fuel, has been operational for nearly five years. The solid product, Process Derived Fuel (PDF), is a stable, low-sulfur, high-Btu fuel similar in composition and handling properties to bituminous coal. The liquid product, Coal Derived Liquid (CDL), is a heavy, low-sulfur, liquid fuel similar in properties to heavy industrial fuel oil. Opportunities for upgrading the CDL to higher value chemicals and fuels have been identified. Significant quantities of both PDF and CDL have been delivered and successfully burned in utility and industrial boilers. A summary of the Project is given.

  5. THz transceiver characterization : LDRD project 139363 final report.

    SciTech Connect

    Nordquist, Christopher Daniel; Wanke, Michael Clement; Cich, Michael Joseph; Reno, John Louis; Fuller, Charles T.; Wendt, Joel Robert; Lee, Mark; Grine, Albert D.

    2009-09-01

    LDRD Project 139363 supported experiments to quantify the performance characteristics of monolithically integrated Schottky diode + quantum cascade laser (QCL) heterodyne mixers at terahertz (THz) frequencies. These integrated mixers are the first all-semiconductor THz devices to successfully incorporate a rectifying diode directly into the optical waveguide of a QCL, obviating the conventional optical coupling between a THz local oscillator and rectifier in a heterodyne mixer system. This integrated mixer was shown to function as a true heterodyne receiver of an externally received THz signal, a breakthrough which may lead to more widespread acceptance of this new THz technology paradigm. In addition, questions about QCL mode shifting in response to temperature, bias, and external feedback, and to what extent internal frequency locking can improve stability have been answered under this project.

  6. Framework for Adaptable Operating and Runtime Systems: Final Project Report

    SciTech Connect

    Patrick G. Bridges

    2012-02-01

    In this grant, we examined a wide range of techniques for constructing high-performance con gurable system software for HPC systems and its application to DOE-relevant problems. Overall, research and development on this project focused in three specifc areas: (1) software frameworks for constructing and deploying con gurable system software, (2) applcation of these frameworks to HPC-oriented adaptable networking software, (3) performance analysis of HPC system software to understand opportunities for performance optimization.

  7. Advanced exterior sensor project : final report, September 2004.

    SciTech Connect

    Ashby, M. Rodema

    2004-12-01

    This report (1) summarizes the overall design of the Advanced Exterior Sensor (AES) system to include detailed descriptions of system components, (2) describes the work accomplished throughout FY04 to evaluate the current health of the original prototype and to return it to operation, (3) describes the status of the AES and the AES project as of September 2004, and (4) details activities planned to complete modernization of the system to include development and testing of the second-generation AES prototype.

  8. The project for an energy-enriched curriculum: Final report

    SciTech Connect

    Not Available

    1984-01-01

    The Project for an Energy-Enriched Curriculum (PEEC) reported was a long-running effort at infusing energy/environment/economics (E/E/E) themes into the K-12 curriculum. While it was conducted as a single integrated effort by the National Science Teachers Association (NSTA), it is supported by a series of contracts and grants, during the period 1976 to 1984, from the Energy Research and Development Administration (ERDA) and the US Department of Energy (DOE).

  9. DOE-University of Arizona Faculty Development Project. Final report

    SciTech Connect

    Fillerup, Joseph M.

    1980-09-08

    The DOE-University of Arizona Faculty Development Project on Energy successfully completed a faculty development program. There were three phases of the program consisting of: a three week energy workshop for teachers, participation and cooperation with Students for Safe Energy in presentation of an Alternative Energy Festival at the University of Arizona, and workshops for teachers conducted at Flowing Wells School District. Each of these is described. Attendees are listed and a director's evaluation of the workshop is given.

  10. Freihoelser Forst Local Training Area rehabilitation project. Final report

    SciTech Connect

    Hinchman, R.R.; Zellmer, S.D.; Johnson, D.O.; Severinghaus, W.D.; Brent, J.J.

    1991-12-01

    Intensive and continued use of the Freihoelser Forst Local Training Area (LTA) for military training activities had resulted in serious environmental problems, exemplified by a lack of vegetative cover and severe erosion by water and wind. The project`s goal was to develop and demonstrate rapid, cost-effective methods to stabilize the LTA`s barren, eroding maneuver areas and make training conditions more realistic. The major factors limiting rehabilitation efforts were the sandy, infertile, and acidic soils. The project was conducted in two phases. Phase I demonstrated and evaluated three separate rehabilitation treatments ranging in cost from moderate to expensive. Each treatment used a different type of soil amendment (fertilizer and straw, compost, or chicken manure), but all used identical seedbed preparation methods and seed mixtures. Phase I was conducted on relatively small replicated plots and was monitored three times during each growing season. All three treatments satisfactorily reestablished vegetation and controlled erosion. Because of their small size, the Phase I demonstration plots had only a minor stabilizing effect on the erosion problems of the LTA as a whole. The Phase II treatment was based on lessons teamed from Phase I and from other revegetation projects in Germany. Phase II revegetated a large area of the LTA, which included nearly all of the most severely disturbed land. Phase II, which was monitored in the same way as Phase I but for a shorter period of time, was highly successful in stabilizing most areas treated. The revegetation plant community was dominated by native grasses and legumes that stabilized the loose, sandy soils and improved the training realism of a major portion of the LTA.

  11. Integrated System Health Management (ISHM) Technology Demonstration Project Final Report

    NASA Technical Reports Server (NTRS)

    Mackey, Ryan; Iverson, David; Pisanich, Greg; Toberman, Mike; Hicks, Ken

    2006-01-01

    Integrated System Health Management (ISHM) is an essential capability that will be required to enable upcoming explorations mission systems such as the Crew Exploration Vehicle (CEV) and Crew Launch Vehicle (CLV), as well as NASA aeronautics missions. However, the lack of flight experience and available test platforms have held back the infusion by NASA Ames Research Center (ARC) and the Jet Propulsion Laboratory (JPL) of ISHM technologies into future space and aeronautical missions. To address this problem, a pioneer project was conceived to use a high-performance aircraft as a low-cost proxy to develop, mature, and verify the effectiveness of candidate ISHM technologies. Given the similarities between spacecraft and aircraft, an F/A-18 currently stationed at Dryden Flight Research Center (DFRC) was chosen as a suitable host platform for the test bed. This report describes how the test bed was conceived, how the technologies were integrated on to the aircraft, and how these technologies were matured during the project. It also describes the lessons learned during the project and a forward path for continued work.

  12. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    SciTech Connect

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.

  13. Final Scientifc Report - Hydrogen Education State Partnership Project

    SciTech Connect

    Leon, Warren

    2012-02-03

    Under the leadership of the Department of Energy Hydrogen and Fuel Cells program, Clean Energy States Alliance (CESA) educated and worked with state leaders to encourage wider deployment of fuel cell and hydrogen technologies. Through outreach to state policymakers, legislative leaders, clean energy funds, energy agencies, and public utility commissions, CESA worked to accomplish the following objectives of this project: 1. Provide information and technical assistance to state policy leaders and state renewable energy programs in the development of effective hydrogen fuel cell programs. 2. Identify and foster hydrogen program best practices. 3. Identify and promote strategic opportunities for states and the Department of Energy (DOE) to advance hydrogen technology deployment through partnerships, collaboration, and targeted activities. Over the three years of this project, CESA, with our partner National Conference of State Legislatures (NCSL), was able to provide credible information on fuel cell policies, finance, and technical assistance to hundreds of state officials and other stakeholders. CESA worked with its membership network to effectively educate state clean energy policymakers, program managers, and decision makers about fuel cell and hydrogen technologies and the efforts by states to advance those technologies. With the assistance of NCSL, CESA gained access to an effective forum for outreach and communication with state legislators from all 50 states on hydrogen issues and policies. This project worked to educate policymakers and stakeholders with the potential to develop and deploy stationary and portable fuel cell technologies.

  14. Space Human Factors Engineering Gap Analysis Project Final Report

    NASA Technical Reports Server (NTRS)

    Hudy, Cynthia; Woolford, Barbara

    2006-01-01

    Humans perform critical functions throughout each phase of every space mission, beginning with the mission concept and continuing to post-mission analysis (Life Sciences Division, 1996). Space missions present humans with many challenges - the microgravity environment, relative isolation, and inherent dangers of the mission all present unique issues. As mission duration and distance from Earth increases, in-flight crew autonomy will increase along with increased complexity. As efforts for exploring the moon and Mars advance, there is a need for space human factors research and technology development to play a significant role in both on-orbit human-system interaction, as well as the development of mission requirements and needs before and after the mission. As part of the Space Human Factors Engineering (SHFE) Project within the Human Research Program (HRP), a six-month Gap Analysis Project (GAP) was funded to identify any human factors research gaps or knowledge needs. The overall aim of the project was to review the current state of human factors topic areas and requirements to determine what data, processes, or tools are needed to aid in the planning and development of future exploration missions, and also to prioritize proposals for future research and technology development.

  15. Wildlife Protection, Mitigation, and Enhancement Plan, Palisades Project: Final Report.

    SciTech Connect

    Meuleman, G. Allyn

    1986-11-01

    Under direction of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 and the subsequent Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program, projects have been developed in Idaho and Wyoming to mitigate the losses of wildlife habitat and annual production due to the development and operation of the Palisades Project. A modified Habitat Evaluation Procedure (HEP) was used to assess the benefits of the preferred mitigation plan to wildlife. The interagency work group used the target species Habitat Units (HU's) lost with inundation of the reservoir area as a guideline during the mitigation planning process, while considering needs of wildlife in eastern Idaho and western Wyoming. A total of 37,068 HU's were estimated to be lost as a result of the inundation of the Palisades Reservoir area. Through a series of protection/enhancement projects, the preferred mitigation plan will provide benefits of an estimated 37,066 HU's. Target species to be benefited by this mitigation plan include bald eagle, mule deer, elk, mallard, Canada goose, mink, yellow warbler, black-capped chickadee, ruffed grouse, and peregrine falcon.

  16. Yakima Fisheries Project : Final Environmental Impact Statement : Summary.

    SciTech Connect

    United States. Bonneville Power Administration; Washington . Dept. of Fish and Wildlife; Confederated Tribes and Bands of the Yakama Nation, Washington.

    1996-01-01

    The Bonneville Power Administration (BPA) proposes to fund the Yakima Fisheries Project (YFP) to undertake fishery research and mitigation activities in the Yakima River Basin. The State of Washington and the Yakama Indian Nation (YIN) would jointly direct the project. In cooperation with BPA, the project managers propose to construct, operate and maintain anadromous (e.g. salmon) fish production facilities The goal is to conduct research activities designed to increase knowledge of supplementation techniques. These techniques would be applied to rebuild naturally spawning anadromous fish stocks historically present in the Yakima River Basin and, ultimately, those throughout the Columbia River Basin. Eventually, the YFP might involve the supplementation of all stocks of anadromous fish known to have occurred in the Yakima Basin. However, at this time only two action alternatives have been proposed, in addition to the No Action alternative: Alternative (1) would supplement depressed naturally spawning populations of upper Yakima spring chinook salmon; Alternative (2) (preferred) would include all actions under Alternative 1; it would also add a study to determine the feasibility of re-establishing a naturally spawning population and a significant fall fishery for coho salmon in the Yakima Basin (Coho smolts are currently being imported from another basin under the Columbia River Basin Fish Management Plan; the stock is now virtually eliminated from the Basin.)

  17. 2009 ESMD Space Grant Faculty Project Final Report

    NASA Technical Reports Server (NTRS)

    Murphy, Gloria; Ghanashyam, Joshi; Guo, Jiang; Conrad, James; Bandyopadhyay, Alak; Cross, William

    2009-01-01

    The Constellation Program is the medium by which we will maintain a presence in low Earth orbit, return to the moon for further exploration and develop procedures for Mars exploration. The foundation for its presence and success is built by the many individuals that have given of their time, talent and even lives to help propel the mission and objectives of NASA. The Exploration Systems Mission Directorate (ESMD) Faculty Fellows Program is a direct contributor to the success of directorate and Constellation Program objectives. It is through programs such as the ESMD Space Grant program that students are inspired and challenged to achieve the technological heights that will propel us to meet the goals and objectives of ESMD and the Constellation Program. It is through ESMD Space Grant programs that future NASA scientists, engineers, and mathematicians begin to dream of taking America to newer heights of space exploration. The ESMD Space Grant program is to be commended for taking the initiative to develop and implement programs that help solidify the mission of NASA. With the concerted efforts of the Kennedy Space Center educational staff, the 2009 ESMD Space Grant Summer Faculty Fellows Program allowed faculty to become more involved with NASA personnel relating to exploration topics for the senior design projects. The 2009 Project was specifically directed towards NASA's Strategic Educational Outcome 1. In-situ placement of Faculty Fellows at the NASA field Centers was essential; this allowed personal interactions with NASA scientists and engineers. In particular, this was critical to better understanding the NASA problems and begin developing a senior design effort to solve the problems. The Faculty Fellows are pleased that the ESMD Space Grant program is taking interest in developing the Senior Design courses at the university level. These courses are needed to help develop the NASA engineers and scientists of the very near future. It has been a pleasure to be

  18. [Project Upper Cumberland. Final Report. Project Upper Cumberland Cultural Arts Program. Final Evaluation. Demonstration Program in Guidance and Counseling. An Evaluation.

    ERIC Educational Resources Information Center

    Flanders, John N.; And Others

    Project Upper Cumberland was a three year endeavor which served 16 Tennessee counties. The final report and evaluation, in three documents, summarizes the three innovative programs which it engendered: (1) teacher inservice training, emphasizing human relations; (2) a pilot cultural arts program (art, music, drama) for grades 1-12; and (3) a pilot…

  19. 35. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. LOOKING BACK FROM STATION 335 AT RETURN CURVE. - Haleakala National Park Roads, Pukalani, Maui County, HI

  20. 36. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. TYPICAL RUBBLE MASONRY HEADWALL AND BOX CULVERT. - Haleakala National Park Roads, Pukalani, Maui County, HI

  1. 38. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. BRIDGE AT STATION 85+. - Haleakala National Park Roads, Pukalani, Maui County, HI

  2. Sulimar Queen environmental restoration project closure package Sandia environmental stewardship exemplar.

    SciTech Connect

    Tillman, Jack B.

    2008-09-01

    In March 2008, Sandia National Laboratories (Sandia), in partnership with the Bureau of Land Management, Roswell Field Office, completed its responsibilities to plug and abandon wells and restore the surface conditions for the Sulimar Queens Unit, a 2,500 acre oil field, in Chaves County, Southeast New Mexico. Sandia assumed this liability in an agreement to obtain property to create a field laboratory to perform extensive testing and experimentation on enhanced oil recovery techniques for shallow oil fields. In addition to plugging and abandoning 28 wells, the project included the removal of surface structures and surface reclamation of disturbed lands associated with all plugged and abandoned wells, access roads, and other auxiliary facilities within unit boundaries. A contracting strategy was implemented to mitigate risk and reduce cost. As the unit is an important wildlife habitat for prairie chickens, sand dune lizards, and mule deer, the criteria for the restoration and construction process were designed to protect and enhance the wildlife habitat. Lessons learned from this project include: (1) extreme caution should be exercised when entering agreements that include future liabilities, (2) partnering with the regulator has huge benefits, and (3) working with industry experts, who were familiar with the work, and subcontractors, who provided the network to complete the project cost effectively.

  3. Real Time Technology Application Demonstration Project Final Report

    SciTech Connect

    Volpe, John; Hampson, Steve; Johnson, Robert L

    2008-09-01

    The work and results described in this final report pertain to the demonstration of real-time characterization technologies applied to potentially contaminated surface soils in and around Area of Concern (AOC) 492 at the Paducah Gaseous Diffusion Plant (PGDP). The work was conducted under the auspices of Kentucky Research Consortium for Energy and Environment (KRCEE). KRCEE was created to support the Department of Energy's (DOE) efforts to complete the expeditious and economically viable environmental restoration of the Paducah Gaseous Diffusion Plant (PGDP), the Western Kentucky Wildlife Management Area (WKWMA), and surrounding areas.

  4. Six month progress report on the Waste Package Project at the University of Nevada, Las Vegas, July 1991--January 1992: Management, quality assurance and overview

    SciTech Connect

    Ladkany, S.G.

    1991-12-31

    The progress of the waste package project at the University of Nevada, Las Vegas was the subject of this report. It covered aspects of management and quality assurance, container design, application of ASME Pressure Vessel Codes, structural analysis of containers, design of rock tunnels for storage, and heat transfer phenomena. (MB)

  5. Six month progress report on the Waste Package Project at the University of Nevada, Las Vegas, July 1991--January 1992: Management, quality assurance and overview

    SciTech Connect

    Ladkany, S.G.

    1991-01-01

    The progress of the waste package project at the University of Nevada, Las Vegas was the subject of this report. It covered aspects of management and quality assurance, container design, application of ASME Pressure Vessel Codes, structural analysis of containers, design of rock tunnels for storage, and heat transfer phenomena. (MB)

  6. 23 CFR 661.25 - What does a complete application package for PE consist of and how does the project receive funding?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false What does a complete application package for PE consist of and how does the project receive funding? 661.25 Section 661.25 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.25 What does a...

  7. Snettisham Hydroelectric Project, Alaska second stage development, Crater lake. Final foundation report. Final report

    SciTech Connect

    Not Available

    1992-09-04

    The important geologic features and methods used to construct the Crater Lake stage of the Snettisham Hydroelectric project, built between 1985 and 1989, are discussed. The project added 31 megawatts of non-polluting, renewable electric power for Juneau, Alaska and the surrounding area. Features of the report include the power tunnel and access adits, penstock excavation, surge shaft, gate shaft and lake top. Construction aspects include the general geology, design features, construction methods, geologic conditions encountered, ground support requirements, grouting, instrumentation and tunnel filling. Foundation conditions for the Crater Lake status were excellent, permitting the power and penstock tunnel and shafts to be constructed essentially unlined. The basic rock type throughout the project is a high-quality, quartz diorite gneiss with randomly spaced, subparallel basalt dikes.... Unlined rock tunnels, Power tunnel, Penstocks, Lake tap, Surge shaft.

  8. MIGRESIVES: a research project on migration from adhesives in food-packaging materials in support of European legislation and standardization.

    PubMed

    Störmer, A; Franz, R

    2009-12-01

    Most food packages and food-contact materials are manufactured using adhesives. The European Union regulates all food-contact materials, as their constituents may not contaminate food and endanger consumers' health. In contrast to plastics which are regulated by positive lists of authorized ingredients, adhesives have not yet a specific regulation. The MIGRESIVES project aimed to elaborate a scientific global risk-assessment approach to meet current general European Union regulatory requirements and as a basis for future specific European Union legislation as well as to provide the industry, especially small and medium-sized enterprises, a tool to ensure that migration from adhesives is in compliance with the regulatory requirements. The idea was to demonstrate that consumers' exposure to chemicals released by adhesives is in many cases below levels of concern. Technical/scientific knowledge from industry and research institutes will be merged into a collective research endeavour gathering all stakeholders. The major milestones are (1) the classification of adhesives according to chemistry and uses, (2) the test strategies based on physico-chemical behaviour of adhesives, (3) modelling migration/exposure from adhesives, (4) providing guidelines to integrate the risk-assessment approach into the daily life of companies, (5) the feasibility of applying the toxicological approach from the European Union BIOSAFEPAPER project, and (6) extensive training/education to small and medium-sized enterprises (SMEs) and large dissemination for general adoption of the concept in Europe.

  9. Fitting HIV Prevalence 1981 Onwards for Three Indian States Using the Goals Model and the Estimation and Projection Package

    PubMed Central

    Bhatnagar, Tarun; Dutta, Tapati; Stover, John; Godbole, Sheela; Sahu, Damodar; Boopathi, Kangusamy; Bembalkar, Shilpa; Singh, Kh. Jitenkumar; Goyal, Rajat; Pandey, Arvind; Mehendale, Sanjay M.

    2016-01-01

    Models are designed to provide evidence for strategic program planning by examining the impact of different interventions on projected HIV incidence. We employed the Goals Model to fit the HIV epidemic curves in Andhra Pradesh, Maharashtra and Tamil Nadu states of India where HIV epidemic is considered to have matured and in a declining phase. Input data in the Goals Model consisted of demographic, epidemiological, transmission-related and risk group wise behavioral parameters. The HIV prevalence curves generated in the Goals Model for each risk group in the three states were compared with the epidemic curves generated by the Estimation and Projection Package (EPP) that the national program is routinely using. In all the three states, the HIV prevalence trends for high-risk populations simulated by the Goals Model matched well with those derived using state-level HIV surveillance data in the EPP. However, trends for the low- and medium-risk populations differed between the two models. This highlights the need to generate more representative and robust data in these sub-populations and consider some structural changes in the modeling equation and parameters in the Goals Model to effectively use it to assess the impact of future strategies of HIV control in various sub-populations in India at the sub-national level. PMID:27711212

  10. Messiah College Biodiesel Fuel Generation Project Final Technical Report

    SciTech Connect

    Zummo, Michael M; Munson, J; Derr, A; Zemple, T; Bray, S; Studer, B; Miller, J; Beckler, J; Hahn, A; Martinez, P; Herndon, B; Lee, T; Newswanger, T; Wassall, M

    2012-03-30

    Many obvious and significant concerns arise when considering the concept of small-scale biodiesel production. Does the fuel produced meet the stringent requirements set by the commercial biodiesel industry? Is the process safe? How are small-scale producers collecting and transporting waste vegetable oil? How is waste from the biodiesel production process handled by small-scale producers? These concerns and many others were the focus of the research preformed in the Messiah College Biodiesel Fuel Generation project over the last three years. This project was a unique research program in which undergraduate engineering students at Messiah College set out to research the feasibility of small-biodiesel production for application on a campus of approximately 3000 students. This Department of Energy (DOE) funded research program developed out of almost a decade of small-scale biodiesel research and development work performed by students at Messiah College. Over the course of the last three years the research team focused on four key areas related to small-scale biodiesel production: Quality Testing and Assurance, Process and Processor Research, Process and Processor Development, and Community Education. The objectives for the Messiah College Biodiesel Fuel Generation Project included the following: 1. Preparing a laboratory facility for the development and optimization of processors and processes, ASTM quality assurance, and performance testing of biodiesel fuels. 2. Developing scalable processor and process designs suitable for ASTM certifiable small-scale biodiesel production, with the goals of cost reduction and increased quality. 3. Conduct research into biodiesel process improvement and cost optimization using various biodiesel feedstocks and production ingredients.

  11. Final report for SNL/NM environmental drilling project

    SciTech Connect

    Wemple, R.P.; Meyer, R.D.; Staller, G.E.; Layne, R.R.

    1994-11-01

    Concern for the environment and cost reduction are driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. The project has tested a variety of prototype machinery and hardware built by the industrial partner, Charles Machine Works (CMW), and SNL at several sites (Savannah River Site (SRS), Hanford, SNL, Kirtland AFB (KAFB), CMW), successfully installed usable horizontal environmental test wells at SRS and SNL/KAFB, and functioned as a clearing house for information regarding application of existing commercial machinery to a variety of governmental and commercial sites. The project has continued to test and develop machinery in FY 94. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of {open_quotes}cut/thrust and compact cuttings without adding large quantities of fluid{close_quotes} to an environmental problem site. This technology will be very cost-effective where applicable. Technology transfer and commercialization by CMW is ongoing and will continue into FY 95. Technology transfer to the private sector is ongoing and reflected in increasing machinery sales to environmental contractors. Education of regulatory agencies resulting in restructuring of appropriate regulatory standards for specification of the horizontal drilling techniques continues to be a long-range goal.

  12. On-farm biogas systems information dissemination project. Final report

    SciTech Connect

    Campbell, J.K.; Koelsch, R.K.; Guest, R.W.; Fabian, E.

    1997-03-01

    The purpose of this project was to study how farmers manage anaerobic digesters on three New York State dairy farms. Two years of data collected were from both plug-flow and tower-type mixed-flow digesters at regular intervals over a three-year period revealed that the financial return from the energy produced by a biogass system in the late 1980`s is marginal. Little difficulty was experienced in operation of the anaerobic digester; however, several farms utilizing congeneration to convert biogas into electricity and heat suffered from not applying maintenance to the congenerator in a timely fashion.

  13. Fabrications of PVDF gratings :final report for LDRD project 79884.

    SciTech Connect

    Rogers, J. A. (University of Illinois, Urbana-Champaign); Carr, Dustin Wade; Bogart, Gregory R.

    2005-12-01

    The purpose of this project was to do some preliminary studies and process development on electroactive polymers to be used for tunable optical elements and MEMS actuators. Working in collaboration between Sandia National Labs and The University of Illinois Urbana-Champaign, we have successfully developed a process for applying thin films of poly (vinylidene fluoride) (PVDF) onto glass substrates and patterning these using a novel stamping technique. We observed actuation in these structures in static and dynamic measurements. Further work is needed to characterize the impact that this approach could have on the field of tunable optical devices for sensing and communication.

  14. Advanced Mixed Waste Treatment Project (AMWTP) Final Environmental Impact Statement

    SciTech Connect

    1999-02-12

    The AMWTP Final EIS assesses the potential environmental impacts associated with alternatives related to the construction and operation of a proposed waste treatment facility at the INEEL. The alternatives analyzed were: the No Action Alternative, the Proposed Action, the Non-Thermal Treatment Alternative, and the Treatment and Storage Alternative. The Proposed Action is the Preferred Alternative. Under the Proposed Action/Preferred Alternative, the AMWTP facility would treat transuranic waste, alpha-contaminated low-level mixed waste, and low-level mixed waste in preparation for disposal. After treatment, transuranic waste would be disposed of at the Waste Isolation Pilot Plant in New Mexico. Low-level mixed waste would be disposed of at an approved disposal facility depending on decisions to be based on DOE's Final Waste Management Programmatic Environmental Impact Statement. Evaluation of impacts on land use, socioeconomics, cultural resources, aesthetic and scenic resources, geology, air resources, water resources, ecological resources, noise, traffic and transportation, occupational and public health and safety, INEEL services, and environmental justice were included in the assessment.

  15. Steamtown District Heating and Cooling Project, Scranton, Pennsylvania. Final report

    SciTech Connect

    1990-04-01

    This report summarizes the activities of a study intended to examine the feasibility of a district heating and cooling alternative for the Steamtown National Historic Site in Scranton, PA. The objective of the study was to investigate the import of steam from the existing district heating system in Scranton which is operated by the Community Central Energy Corporation and through the use of modern technology provide hot and chilled water to Steamtown for its internal heating and cooling requirements. Such a project would benefit Steamtown by introducing a clean technology, eliminating on-site fuel use, avoiding first costs for central heating and cooling plants and reducing operation and maintenance expenditures. For operators of the existing district heating system, this project represents an opportunity to expand their customer base and demonstrate new technologies. The study was conducted by Joseph Technology Corporation, Inc. and performed for the Community Central Energy Corporation through a grant by the US Department of Energy. Steamtown was represented by the National Park Service, the developers of the site.

  16. LIMB Demonstration Project Extension and Coolside Demonstration. [Final report

    SciTech Connect

    Goots, T.R.; DePero, M.J.; Nolan, P.S.

    1992-11-10

    This report presents results from the limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. LIMB is a furnace sorbent injection technology designed for the reduction of sulfur dioxide (SO{sub 2}) and nitrogen oxides (NO{sub x}) emissions from coal-fired utility boilers. The testing was conducted on the 105 Mwe, coal-fired, Unit 4 boiler at Ohio Edison`s Edgewater Station in Lorain, Ohio. In addition to the LIMB Extension activities, the overall project included demonstration of the Coolside process for S0{sub 2} removal for which a separate report has been issued. The primary purpose of the DOE LIMB Extension testing, was to demonstrate the generic applicability of LIMB technology. The program sought to characterize the S0{sub 2} emissions that result when various calcium-based sorbents are injected into the furnace, while burning coals having sulfur content ranging from 1.6 to 3.8 weight percent. The four sorbents used included calcitic limestone, dolomitic hydrated lime, calcitic hydrated lime, and calcitic hydrated lime with a small amount of added calcium lignosulfonate. The results include those obtained for the various coal/sorbent combinations and the effects of the LIMB process on boiler and plant operations.

  17. Wildlife Impact Assessment Palisades Project, Idaho, Final Report.

    SciTech Connect

    Sather-Blair, Signe

    1985-02-01

    The Habitat Evaluation Procedures were used to evaluate pre- and post-construction habitat conditions of the US Bureau of Reclamation's Palisades Project in eastern Idaho. Eight evaluation species were selected with losses expressed in the number of Habitat Units (HU's). One HU is equivalent to one acre of prime habitat. The evaluation estimated that a loss of 2454 HU's of mule deer habitat, 2276 HU's of mink habitat, 2622 HU's of mallard habitat, 805 HU's of Canada goose habitat, 2331 HU's of ruffed grouse habitat, 5941 and 18,565 HU's for breeding and wintering bald eagles, and 1336 and 704 HU's for forested and scrub-shrub wetland nongame species occurred as a result of the project. The study area currently has 29 active osprey nests located around the reservoir and the mudflats probably provide more feeding habitat for migratory shore birds and waterfowl than was previously available along the river. A comparison of flow conditions on the South Fork of the Snake River below the dam between pre- and post-construction periods also could not substantiate claims that water releases from the dam were causing more Canada goose nest losses than flow in the river prior to construction. 41 refs., 16 figs., 9 tabs.

  18. Green River Formation water flood demonstration project. Final report

    SciTech Connect

    Pennington, B.I.; Dyer, J.E.; Lomax, J.D. |; Deo, M.D.

    1996-11-01

    The objectives of the project were to understand the oil production mechanisms in the Monument Butte unit via reservoir characterization and reservoir simulations and to transfer the water flooding technology to similar units in the vicinity, particularly the Travis and the Boundary units. The reservoir characterization activity in the project basically consisted of extraction and analysis of a full diameter core, Formation Micro Imaging (FMI) logs from several wells and Magnetic Resonance Imaging (MRI) logs from two wells. In addition, several side-wall cores were drilled and analyzed, oil samples from a number of wells were physically and chemically characterized (using high-temperature gas chromatography), oil-water relative permeabilities were measured and pour points and cloud points of a few oil samples were determined. The reservoir modeling activity comprised of reservoir simulation of all the three units at different scales and near well-bore modeling of the wax precipitation effects. The reservoir simulation activities established the extent of pressurization of the sections of the reservoirs in the immediate vicinity of the Monument Butte unit. This resulted in a major expansion of the unit and the production from this expanded unit increased from about 300 barrels per day to about 2,000 barrels per day.

  19. Minimal Technologies Application Project, Hohenfels Training Area, Germany: Final report

    SciTech Connect

    Zellmer, S.D.; Hinchman, R.R.; Johnson, D.O.; Severinghaus, W.D.; Brent, J.J.

    1991-12-01

    At the US Army Hohenfels Training Area in Germany, more than 30 years of continuous and intensive tactical training has caused extensive environmental damage because of the loss of vegetative cover and accelerated soil erosion. A project was conducted to evaluate the cost-effectiveness and relative benefits of various revegetation procedures. These procedures involved amendment and seedbed preparation options that were combined with three different durations of site closure. The point-intercept method was used to measure the types and amounts of vegetation established and changes in the vegetative community. Over three growing seasons, applications of fertilizer and seed increased the percent grass, legume, and total vegetative cover. The duration of site closure had no influence on the types or amounts of ground cover established. Materials made up only 10% of the total cost of the fertilization and seeding operations. The results of the research indicate that less expensive methods of amendment application should be evaluated. The data also show that site closure is not practical, economical, or necessary. The results of this project suggest that a regular maintenance program consisting of seeding and fertilization is required to maintain adequate vegetative cover and control erosion on tactical training areas.

  20. March 2010 Groundwater Sampling at the Project Shoal Site, Nevada (Data Validation Package)

    SciTech Connect

    2011-03-01

    The U.S. Department of Energy Office of Legacy Management conducted annual sampling at the Project Shoal Area (Shoal) in March 2010. Wells HC-4, HC-5, HC-7, HC-8, MV-1, MV-2 and MV-3 were sampled March 10-12, 2010, as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PLN/S04351, continually updated). Wells HC-1, HC-2, HC-3, and HC-6 were sampled March 24, 2010, by Desert Research Institute personnel.

  1. Final EDP Ti: sapphire amplifiers for ELI project

    NASA Astrophysics Data System (ADS)

    Chvykov, Vladimir; Kalashnikov, Mikhail; Osvay, Károly

    2015-05-01

    Recently several ultrahigh intensity Chirped Pulse Amplification (CPA) laser systems have reached petawatt output powers [1, 2] setting the next milestone at tens or even hundreds petawatts for the next three to ten years [3, 4]. These remarkable results were reached when laser amplifiers (opposite to Optical Parametric Amplification (OPA) [5]) were used as final ones and from them Ti:Sapphire crystals supposed to be the working horses as well in the future design of these laser systems. Nevertheless, the main limitation that arises on the path toward ultrahigh output power and intensity is the restriction on the pumping and extraction energy imposed by Transverse Amplified Spontaneous Emission (TASE) [6] and/or transverse parasitic generation (TPG) [7] within the large aperture of the disc-shape amplifier volume.

  2. Projection models for health-effects assessment in populations exposed to radioactive and nonradioactive pollutants. Volume III. SPAHR interactive package guide

    SciTech Connect

    Collins, J.J.

    1982-09-01

    The Simulation Package for the Analysis of Health Risk (SPAHR) is a computer software package based upon a demographic model for health risk projectons. The model extends several health risk projection models by making realistic assumptions about the population at risk, adn thus represents a distinct improvement over previous models. Complete documentation for use of SPAHR is contained in this five-volume publication. The demographic model in SPAHR estimates population response to environmental toxic exposures. Latency of response, changing dose level over time, competing risks from other causes of death, and population structure can be incorporated into SPAHR to project health risks. Risks are measured by morbid years, number of deaths, and loss of life expectancy. Comparisons of estimates of excess deaths demonstrate that previous health risk projection models may have underestimated excess deaths by a factor of from 2 to 10, depending on the pollutant and the exposure scenario. The software supporting the use of the demographic model is designed to be user oriented. Complex risk projections are made by responding to a series of prompts generated by the package. The flexibility and ease of use of SPAHR make it an important contribution to existing models and software packages. This manual outlines the use of the interactive capabilities of SPAHR. SPAHR is an integrated system of computer programs designed for simulating numerous health risk scenarios using the techniques of demographic modeling. This system of computer programs has been designed to be very flexible so as to allow the user to simulate a large variety of scenarios. It provides the user with an integrated package for projecting the impacts on human health of exposure to various hazards, particularly those resulting from the effluents related to energy production.

  3. 75 FR 29601 - Notice of Final Federal Agency Actions on a Proposed Highway Project in California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-26

    ...(1)(1). This action relates to an approval of a proposed highway project corridor. DATES: By this notice, the FHWA is advising the public of final agency actions subject to 23 U.S.C. 139(1)(1). A claim... agency actions by issuing approvals for the Placer Parkway Corridor Preservation Project--Tier 1 in...

  4. The Elder Abuse Prevention Project, Phase Two, Three and Four. Final Report.

    ERIC Educational Resources Information Center

    Regina Univ. (Saskatchewan). Univ. Extension. Seniors Education Centre.

    This document presents the final report from an educational and community development program designed to raise awareness about the abuse and neglect of the elderly. The Elder Abuse Prevention Project is briefly described in terms of project goals, objectives, the model used, the target groups served, and the evaluation processes employed. It is…

  5. The North Carolina Partnership Training System: Distance Education Project. Final Report.

    ERIC Educational Resources Information Center

    North Carolina Univ., Chapel Hill.

    This final report describes accomplishments and activities of the North Carolina Partnership Training System Distance Education Project, a 3-year federally supported project to establish a distance education personnel development program to prepare more qualified and certified teachers for students with behavioral and/or emotional handicaps (BEH),…

  6. Kentucky Systems Change Project for Students with Severe Disabilities (1987-1992). Final Report.

    ERIC Educational Resources Information Center

    Lewis, Preston; Kleinert, Harold L.

    This final report describes a 5-year Kentucky project to improve integrated educational services and life quality of children and youth with severe disabilities, including students with deaf-blindness. Project objectives focus on the identification and removal of barriers to effective integrated programs; the provision of educational services on…

  7. 76 FR 81011 - Notice of Final Federal Agency Actions on Proposed Light Rail Project in Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... Administration on December 16, 2011 (76 FR 78332). This notice applies to all Federal agency decisions, actions... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Light Rail Project in... meaning of 23 U.S.C. 139(l)(1). The actions relate to the East Link Light Rail Transit Project in...

  8. 40. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii, T.H. GENERAL VIEW OT THE PROJECT SHOWING CONSPICUOUS SCARS. THE BEFORE PHOTO OF A BEFORE AND AFTER SET. AFTER PHOTO IS HI-52-41. - Haleakala National Park Roads, Pukalani, Maui County, HI

  9. Combating Illiteracy among the Elderly: A Cost-Effective Strategy. Final Project Report.

    ERIC Educational Resources Information Center

    National Council on the Aging, Inc., Washington, DC.

    This final report of the Literacy Education for the Elderly Project (LEEP) provides a description and the results of the project designed to target literacy education to the older adult. The strategy of the two-year program, established in 27 sites nationwide, was to: (1) link the local level aging services network with the volunteer adult…

  10. California Confederation on Inclusive Education. Statewide Systems Change Project Final Report, 1995-2001.

    ERIC Educational Resources Information Center

    California State Univ., Los Angeles.

    This final report describes the accomplishments and activities of a 5-year federally funded California systems change project supporting the development and replication of inclusive schools as part of the state's movement to provide the least restrictive educational environment for all students with severe disabilities. The project was a…

  11. CBSS Outreach Project: Computer-Based Study Strategies for Students with Learning Disabilities. Final Report.

    ERIC Educational Resources Information Center

    Anderson-Inman, Lynne; Ditson, Mary

    This final report describes activities and accomplishments of the four-year Computer-Based Study Strategies (CBSS) Outreach Project at the University of Oregon. This project disseminated information about using computer-based study strategies as an intervention for students with learning disabilities and provided teachers in participating outreach…

  12. Project SPRUCE, Special Program of Rehabilitation for Unemployment Compensation Exhaustees. Vol. 2. Supplement to Final Report.

    ERIC Educational Resources Information Center

    Dorkin, Murray; Solomon, Herman S.

    The supplement to the final report of Project SPRUCE (a program to increase the employability of insured workers who experience long-term unemployment and seem likely to exhaust their benefit rights) summarizes in detail the problems encountered in the administering of the project, the operational procedures followed, and the training program…

  13. Final report on Project ESEPP (LEAP+) for the period January 1, 1996 - August 1, 1998

    SciTech Connect

    Henley, Vernard Jr.

    2000-03-10

    This is the final report for the Project to Enhance Student Science and Engineering Preparation at the Pre-College Level (Project ESEPP) for the period from January 1, 1996 through August 1, 1998. This report summarizes the accomplishments of the program and its ability to meet the objectives described in the original proposal (1990).

  14. CASEI Project (Consultation and Administration Specialists in Early Intervention) Final Report.

    ERIC Educational Resources Information Center

    Ostrosky, Michaelene M.

    This final report describes the activities and accomplishments of the Consultation and Administration Specialists in Early Intervention Project (CASEI). This federally funded project was developed to provide cross-disciplinary preservice training for early intervention (EI) specialists in Illinois. Students were recruited from a broad range of…

  15. Through Shared Windows: Outreach Project for Infants, Toddlers, and Children with Developmental Disabilities. Final Report.

    ERIC Educational Resources Information Center

    Harrison, Holly

    This final report describes activities and accomplishments of the Through Shared Windows (TSW) Outreach Project, a 4-year project at the University of New Mexico designed to improve services to young children with disabilities and their families. Three major outcomes were accomplished. First, a Web site was developed that focuses on observational…

  16. Nucla circulating atmospheric fluidized bed demonstration project. Final report

    SciTech Connect

    Not Available

    1991-10-01

    Colorado-Ute Electric Association began a study to evaluate options for upgrading and extending the life of its Nucla power station in 1982. Located in southwestern Colorado near the town of Nucla, this station was commissioned in 1959 with a local bituminous coal as its design fuel for three identical stoker-fired units, each rated at 12.6 MW(e). Poor station efficiency, high fuel costs, and spiraling boiler maintenance costs forced the Nucla Station into low priority in the CUEA dispatch order as early as 1981. Among the options CUEA considered was to serve as a host utility to demonstrate Atmospheric Fluidized Bed Combustion (AFBC) technology. The anticipated environmental benefits and apparent attractive economics of a circulating AFBC led to Colorado-Ute`s decision to proceed with the design and construction of a demonstration project in 1984 at the Nucla facility.

  17. Final Report for the Soboba Strategic Tribal Energy Planning Project

    SciTech Connect

    Miller, Kim

    2013-09-17

    In 2011 the Tribe was awarded funds from the Department of Energy to formulate the Soboba Strategic Tribal Energy Plan. This will be a guiding document used throughout the planning of projects focused on energy reduction on the Reservation. The Soboba Strategic Tribal Energy Plan's goal is to create a Five Year Energy Plan for the Soboba Band of Luiseno Indians in San Jacinto, California. This plan will guide the decision making process towards consistent progress leading to the Tribal goal of a 25% reduction in energy consumption in the next five years. It will additionally outline energy usage/patterns and will edentify areas the Tribe can decrease energy use and increase efficiency. The report documents activities undertaken under the grant, as well as incldues the Tribe's strategif energy plan.

  18. [The Southern Sierra Nevada continental dynamics project]. Final technical report

    SciTech Connect

    Clayton, R.W.; Saleeby, J.B.

    1997-12-16

    The main objective of this study was to determine whether or not the Southern Sierra Nevada Mountain Range is supported by a crustal root. A secondary goal was to evaluate the relationship between the Sierra Nevada Range and the adjoining Death Valley extensional province. As part of the project, two seismic profiles were executed. The first was a north-south profile running from Ridgecrest to Chafant Valley. The second was an east-west profile from Death Valley to Coalinga. An NPE shot was recorded on the east-west receiver line, and the data were analyzed by forward modeling with a staggered-grid finite-difference code. Concurrently, the authors initiated an in-depth study of lower crustal and upper mantle xenoliths hosted by Neogene volcanic rocks of the central and southern Sierra Nevada region. This initial work focused on thermobarometric estimates of representative xenolith samples aimed at understanding the vertical composition of the Sierra Nevada lithosphere.

  19. North Dakota Thunderstorm Project. Final report, April 1989-March 1991

    SciTech Connect

    Boe, B.A.

    1991-11-20

    The North Dakota Thunderstorm Project (NDTP) was a national scale research program conducted in central North Dakota during June and July, 1989. The program was hosted and coordinated by the North Dakota Atmospheric Resource Board, and funded jointly by the National Oceanic and Atmospheric Administration (NOAA), the State of North Dakota, and the National Science Foundation. Data collection with four Doppler radars, six aircraft, and a variety of supporting instrumentation began 12 June 1989, and continued through 22 July 1989. In all, 106 of the nineteen various predefined experiments were conducted, though severe storms were fewer in number than expected. Several different atmospheric tracer techniques were employed, including gaseous (sulfur hexafluoride), radar chaff, natural (ozone, carbon monoxide), and fluorescent beads.

  20. Monticello Lead Plant License Renewal Project summary report. Final report

    SciTech Connect

    Bailey, T.L.; Pickens, T.A.; Gregor, F.E.; Stancavage, P.P.

    1996-02-01

    The Monticello Lead Plant License Renewal Project is sponsored by the Electric Power Research Institute and the Department of Energy to demonstrate the license renewal process for boiling water reactors. The initial technical tasks for the project are the subject of this summary report: Task 2, Identification of Systems, Structures, and Components Important to License Renewal; Task 3, Evaluation of Systems, Structures, and Components; and Task 4, Maintenance and Operational Practices. Task 2 identified systems, structures and components which require evaluation for license renewal. Task 3 provides an evaluation of aging mechanisms affecting structures and components. Task 3 evaluations define structure or component boundaries and identify pertinent physical features, design data, operating/maintenance history, potentially significant age-related degradation mechanisms, and degradation sites. Task 4 provides an evaluation of selected plant programs which apply to these structures and components. The capability of programs to detect and mitigate aging mechanisms and/or to maintain the required function is determined. Enhancements are recommended when required to meet program effectiveness criteria. The results of these evaluations are documented as part of Task 6 in Technical Support Documents. This 4-year effort was the first time that the Nuclear Regulatory Commission`s (NRC) license renewal evaluation criteria were applied to specific plant structures and components. Evaluations which identified potentially significant aging mechanisms were performed for most components. Other evaluation methods were developed and applied that relied on published aging investigations or inherent design and operating features of the plant. Evaluation approaches were reviewed with sponsoring organizations and representatives from other organizations and utilities. Examples of the evaluation approach and sample results were presented to the NRC staff on several occasions.

  1. Final report and recommendations of the ESnet Authentication Pilot Project

    SciTech Connect

    Johnson, G.R.; Moore, J.P.; Athey, C.L.; Engert, D.E.; Ramus, J.E.

    1995-01-01

    To conduct their work, U.S. Department of Energy (DOE) researchers require access to a wide range of computing systems and information resources outside of their respective laboratories. Electronically communicating with peers using the global Internet has become a necessity to effective collaboration with university, industrial, and other government partners. DOE`s Energy Sciences Network (ESnet) needs to be engineered to facilitate this {open_quotes}collaboratory{close_quotes} while ensuring the protection of government computing resources from unauthorized use. Sensitive information and intellectual properties must be protected from unauthorized disclosure, modification, or destruction. In August 1993, DOE funded four ESnet sites (Argonne National Laboratory, Lawrence Livermore National Laboratory, the National Energy Research Supercomputer Center, and Pacific Northwest Laboratory) to begin implementing and evaluating authenticated ESnet services using the advanced Kerberos Version 5. The purpose of this project was to identify, understand, and resolve the technical, procedural, cultural, and policy issues surrounding peer-to-peer authentication in an inter-organization internet. The investigators have concluded that, with certain conditions, Kerberos Version 5 is a suitable technology to enable ESnet users to freely share resources and information without compromising the integrity of their systems and data. The pilot project has demonstrated that Kerberos Version 5 is capable of supporting trusted third-party authentication across an inter-organization internet and that Kerberos Version 5 would be practical to implement across the ESnet community within the U.S. The investigators made several modifications to the Kerberos Version 5 system that are necessary for operation in the current Internet environment and have documented other technical shortcomings that must be addressed before large-scale deployment is attempted.

  2. Final Report for Project. Quark matter under extreme conditions

    SciTech Connect

    Incera, Vivian; Ferrer, Efrain

    2015-12-31

    The results obtained in the two years of the grant have served to shine new light on several important questions about the phases of quantum chromodynamics (QCD) under extreme conditions that include quark matter at high density, as well quark-gluon plasma at high temperatures, both in the presence of strong magnetic fields. The interest in including an external magnetic field on these studies is motivated by the generation of large magnetic fields in off-central heavy-ion collisions and by their common presence in astrophysical compact objects, the two scenarios where the physics of quark matter becomes relevant. The tasks carried out in this DOE project led us, among other things, to discover the first connection between the physics of very dense quark matter and novel materials as for instance topological insulators and Weyl semimetals; they allowed us to find a physical explanation for and a solution to a standing puzzle in the apparent effect of a magnetic field on the critical temperature of the QCD chiral transition; and they led us to establish by the first time that the core of the observed two-solar-mass neutron stars could be made up of quark matter in certain inhomogeneous chiral phases in a magnetic field and that this was consistent with current astrophysical observations. A major goal established by the Nuclear Science Advisory committee in its most recent report “Reaching for the Horizon” has been “to truly understand how nuclei and strongly interacting matter in all its forms behave and can predict their behavior in new settings.” The results found in this DOE project have all contributed to address this goal, and thus they are important for advancing fundamental knowledge in the area of nuclear physics and for enhancing our understanding of the role of strong magnetic fields in the two settings where they are most relevant, neutron stars and heavy-ion collisions.

  3. Homeostatic utility controls applied to TVA: Final project report

    SciTech Connect

    Puettgen, H.B.; Ghoudjebaklou, H.

    1986-03-01

    This project concerns a way for a utility to interact with its customers to achieve a better load profile. The customers are those who have some degrees of freedom as far as their load schedules are concerned. Such a customer, a Small Power Producing Facility (SPPF), may shift its demand during the day or may be selling energy back to the utility during parts of the day. The utility must provide incentives for the customer that ''help'' the utility load curve; these incentives are the energy rates. The fundamental question is how a particular SPPF will react to a set of selling and buying prices when it carries out an optimization of its own operation. Another problem is that of sizing, during the plant design stages, of some of the on-site SPPF facilities, such as the on-site energy storage capacity. This can be done once the energy selling and buying rates are set. These design oriented problems are of importance when a utility advises its customers as to what type and size of on-site installations are financially feasible. However, the only true ''control'' that the utility has over the SPPF is through the selling and buying of energy rates. It is of key importance to be able to determine a set of selling and buying energy rates which, while still within reasonable limits, ''induce'' the proper behavior by the SPPF to satisfy the utility desired constraints. The global impact of all SPPF's on the utility system has also been evaluated in this project. 46 refs., 19 figs., 48 tabs.

  4. Project Senior. Innovations in Educational Programming for the Elderly. A Pilot Project: Thermopolis, Wyoming. [Final Report].

    ERIC Educational Resources Information Center

    Owsley, Jean

    A pilot project, entitled Project Senior, was developed and implemented to provide innovative educational programing for older adults in the small rural setting of Thermopolis, Wyoming. Included among the major project activities were the following: a door-to-door survey of 759 persons over 55 years old to determine those courses most desired by…

  5. Quarterly progress report on the DOE Waste Package project at the University of Nevada, Las Vegas, July 1, 1993 through September 30, 1993

    SciTech Connect

    Ladkany, S.G.

    1993-11-01

    Progress reports are presented for the following tasks: overview and progress of waste package project and container design; waste container design considerations (criticality analysis, experimental drift model); waste container alternate design considerations; thermal simulation of high level nuclear waste canister emplacement; structural analysis and design of nuclear waste package canister; robotic manipulation of the nuclear waste container; investigation of stress in a circular tunnel due to overburden & thermal loading of horizontally placed 21PWR multi-purpose canisters; investigation of faulted tunnel models by combined photoelasticity and finite element analysis; and transport phenomena in the near field.

  6. 42 CFR 137.332 - On what basis may the Secretary reject a final construction project proposal?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... construction project proposal? 137.332 Section 137.332 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...-GOVERNANCE Construction Project Assumption Process § 137.332 On what basis may the Secretary reject a final construction project proposal? (a) The only basis for rejection of project activities in a final...

  7. 42 CFR 137.332 - On what basis may the Secretary reject a final construction project proposal?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... construction project proposal? 137.332 Section 137.332 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...-GOVERNANCE Construction Project Assumption Process § 137.332 On what basis may the Secretary reject a final construction project proposal? (a) The only basis for rejection of project activities in a final...

  8. 42 CFR 137.332 - On what basis may the Secretary reject a final construction project proposal?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... construction project proposal? 137.332 Section 137.332 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...-GOVERNANCE Construction Project Assumption Process § 137.332 On what basis may the Secretary reject a final construction project proposal? (a) The only basis for rejection of project activities in a final...

  9. 42 CFR 137.332 - On what basis may the Secretary reject a final construction project proposal?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... construction project proposal? 137.332 Section 137.332 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...-GOVERNANCE Construction Project Assumption Process § 137.332 On what basis may the Secretary reject a final construction project proposal? (a) The only basis for rejection of project activities in a final...

  10. 42 CFR 137.332 - On what basis may the Secretary reject a final construction project proposal?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... construction project proposal? 137.332 Section 137.332 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...-GOVERNANCE Construction Project Assumption Process § 137.332 On what basis may the Secretary reject a final construction project proposal? (a) The only basis for rejection of project activities in a final...

  11. Biomass Burning Observation Project (BBOP) Final Campaign Report

    SciTech Connect

    Kleinman, LI; Sedlacek, A. J.

    2016-01-01

    The Biomass Burning Observation Project (BBOP) was conducted to obtain a better understanding of how aerosols generated from biomass fires affect the atmosphere and climate. It is estimated that 40% of carbonaceous aerosol produced originates from biomass burning—enough to affect regional and global climate. Several biomass-burning studies have focused on tropical climates; however, few campaigns have been conducted within the United States, where millions of acres are burned each year, trending to higher values and greater climate impacts because of droughts in the West. Using the Atmospheric Radiation Measurement (ARM) Aerial Facility (AAF), the BBOP deployed the Gulfstream-1 (G-1) aircraft over smoke plumes from active wildfire and agricultural burns to help identify the impact of these events and how impacts evolve with time. BBOP was one of very few studies that targeted the near-field time evolution of aerosols and aimed to obtain a process-level understanding of the large changes that occur within a few hours of atmospheric processing.

  12. Town of Edinburg landfill reclamation demonstration project. Final report

    SciTech Connect

    Not Available

    1992-05-15

    Landfill reclamation is the process of excavating a solid waste landfill to recover materials, reduce environmental impacts, restore the land resource, and, in some cases, extend landfill life. Using conventional surface mining techniques and specialized separation equipment, a landfill may be separated into recyclable material, combustible material, a soil/compost fraction and residual waste. A landfill reclamation demonstration project was hosted at the Town of Edinburg municipal landfill in northwest Saratoga County. The report examines various separation techniques employed at the site and appropriate uses for reclaimed materials. Specifications regarding engineered work plans, health and safety monitoring, and contingency preparedness are discussed. Major potential applications and benefits of using landfill reclamation technology at existing landfills are identified and discussed. The research and development aspect of the report also examines optimal screening technologies, site selection protocol and the results of a test burn of reclaimed waste at a waste-to-energy facility. Landfill reclamation costs are developed, and economic comparisons are made between reclamation costs and conventional landfill closure costs, with key criteria identified. The results indicate that, although dependent on site-specific conditions and economic factors, landfill reclamation can be a technically and economically feasible alternative or companion to conventional landfill closure under a range of favorable conditions. Feasibility can be determined only after an investigation of the variety of landfill conditions and reclamation options.

  13. Staunton 1 reclamation demonstration project. Aquatic ecosystems. Final report

    SciTech Connect

    Vinikour, W. S.

    1981-02-01

    To provide long-term indications of the potential water quality improvements following reclamation efforts at the Staunton 1 Reclamation Demonstration Project, macroinvertebrates were collected from three on-site ponds and from the receiving stream (Cahokia Creek) for site drainage. Implications for potential benthic community differences resulting from site runoff were disclosed, but macroinvertebrate diversity throughout Cahokia Creek was limited due to an unstable, sandy substrate. The three ponds sampled were the New Pond, which was created as part of the reclamation activities; the Shed Pond, which and the Old Pond, which, because it was an existing, nonimpacted pond free of site runoff, served as a control. Comparisons of macroinvertebrates from the ponds indicated the potential for the New Pond to develop into a productive ecosystem. Macroinvertebrates in the New Pond were generally species more tolerant of acid mine drainage conditions. However, due to the present limited faunal densities and the undesirable physical and chemical characteristics of the New Pond, the pond should not be stocked with fish at this time.

  14. BACA Project: geothermal demonstration power plant. Final report

    SciTech Connect

    Not Available

    1982-12-01

    The various activities that have been conducted by Union in the Redondo Creek area while attempting to develop the resource for a 50 MW power plant are described. The results of the geologic work, drilling activities and reservoir studies are summarized. In addition, sections discussing the historical costs for Union's involvement with the project, production engineering (for anticipated surface equipment), and environmental work are included. Nineteen geothermal wells have been drilled in the Redondo Creek area of the Valles Caldera: a prominent geologic feature of the Jemez mountains consisting of Pliocene and Pleistocene age volcanics. The Redondo Creek area is within a complex longitudinal graben on the northwest flank of the resurgent structural dome of Redondo Peak and Redondo Border. The major graben faults, with associated fracturing, are geologically plausible candidates for permeable and productive zones in the reservoir. The distribution of such permeable zones is too erratic and the locations too imprecisely known to offer an attractive drilling target. Log analysis indicates there is a preferred mean fracture strike of N31W in the upper portion of Redondo Creek wells. This is approximately perpendicular to the major structure in the area, the northeast-striking Redondo Creek graben. The geothermal fluid found in the Redondo Creek reservoir is relatively benign with low brine concentrations and moderate H/sub 2/S concentrations. Geothermometer calculations indicate that the reservoir temperature generally lies between 500/sup 0/F and 600/sup 0/F, with near wellbore flashing occurring during the majority of the wells' production.

  15. Final 2014 Remedial Action Report Project Chariot, Cape Thompson, Alaska

    SciTech Connect

    None, None

    2015-03-01

    This report was prepared to document remedial action (RA) work performed at the former Project Chariot site located near Cape Thompson, Alaska during 2014. The work was managed by the U.S. Army Corps of Engineers (USACE) Alaska District for the U.S. Department of Energy (DOE) Office of Legacy Management (LM). Due to the short field season and the tight barge schedule, all field work was conducted at the site July 6 through September 12, 2014. Excavation activities occurred between July 16 and August 26, 2014. A temporary field camp was constructed at the site prior to excavation activities to accommodate the workers at the remote, uninhabited location. A total of 785.6 tons of petroleum, oil, and lubricants (POL)-contaminated soil was excavated from four former drill sites associated with test holes installed circa 1960. Diesel was used in the drilling process during test hole installations and resulted in impacts to surface and subsurface soils at four of the five sites (no contamination was identified at Test Hole Able). Historic information is not definitive as to the usage for Test Hole X-1; it may have actually been a dump site and not a drill site. In addition to the contaminated soil, the steel test hole casings were decommissioned and associated debris was removed as part of the remedial effort.

  16. Advanced Large Area Plastic Scintillator Project (ALPS): Final Report

    SciTech Connect

    Jordan, David V.; Reeder, Paul L.; Todd, Lindsay C.; Warren, Glen A.; McCormick, Kathleen R.; Stephens, Daniel L.; Geelhood, Bruce D.; Alzheimer, James M.; Crowell, Shannon L.; Sliger, William A.

    2008-02-05

    The advanced Large-Area Plastic Scintillator (ALPS) Project at Pacific Northwest National Laboratory investigated possible technological avenues for substantially advancing the state-of-the-art in gamma-ray detection via large-area plastic scintillators. The three predominant themes of these investigations comprised the following: * Maximizing light collection efficiency from a single large-area sheet of plastic scintillator, and optimizing hardware event trigger definition to retain detection efficiency while exploiting the power of coincidence to suppress single-PMT "dark current" background; * Utilizing anti-Compton vetoing and supplementary spectral information from a co-located secondary, or "Back" detector, to both (1) minimize Compton background in the low-energy portion of the "Front" scintillator's pulse-height spectrum, and (2) sharpen the statistical accuracy of the front detector's low-energy response prediction as impelmented in suitable energy-windowing algorithms; and * Investigating alternative materials to enhance the intrinsic gamma-ray detection efficiency of plastic-based sensors.

  17. Final project report, staff exchange with Finnigan Corporation

    SciTech Connect

    Edmonds, C.G.

    1993-08-01

    The objective of the exchange between Pacific Northwest Laboratory (PNL) and Finnigan Corporation is a transfer of expertise and technology for the design and operation of efficient and sensitive atmospheric pressure/vacuum electrospray ionization (ESI) sources. The development of such ion sources will permit wider application of mass spectrometry instrumentation in applied studies in a variety of disciplines including clinical, forensic, biochemical, biotechnical, and environmental studies where sensitivity is a paramount concern. Two meetings were held between representatives of Finnigan Corporation (led by Dr. Ian Jardine, Director for Marketing, Finnigan Corporation) and PNL staff members. During these meetings, Finnigan and PNL staff surveyed the existing technology for atmosphere/vacuum interface of mass spectrometry to ESI. The representatives from Finnigan viewed demonstrations of recent developments that increased efficiency and sensitivity for ESI mass spectrometry. During these meetings, knowledge and expertise were shared in the development of instrumentation, methods, and applications of ESI mass spectrometry with particular emphasis on current and planned Finnigan instrumentation. With the objective of more effective and competitive products for Finnigan Corporation, concepts for a Cooperative Research and Development Agreement (CRADA) were directed toward the development and commercialization of advanced high efficiency and sensitivity ESI technology. A detailed proposal and work plan for the cooperative project was developed and is included in this report.

  18. Decontamination and decommissioning of the Experimental Boiling Water Reactor (EBWR): Project final report, Argonne National Laboratory

    SciTech Connect

    Fellhauer, C.R.; Boing, L.E.; Aldana, J.

    1997-03-01

    The Final Report for the Decontamination and Decommissioning (D&D) of the Argonne National Laboratory - East (ANL-E) Experimental Boiling Water Reactor (EBWR) facility contains the descriptions and evaluations of the activities and the results of the EBWR D&D project. It provides the following information: (1) An overall description of the ANL-E site and EBWR facility. (2) The history of the EBWR facility. (3) A description of the D&D activities conducted during the EBWR project. (4) A summary of the final status of the facility, including the final and confirmation surveys. (5) A summary of the final cost, schedule, and personnel exposure associated with the project, including a summary of the total waste generated. This project report covers the entire EBWR D&D project, from the initiation of Phase I activities to final project closeout. After the confirmation survey, the EBWR facility was released as a {open_quotes}Radiologically Controlled Area,{close_quotes} noting residual elevated activity remains in inaccessible areas. However, exposure levels in accessible areas are at background levels. Personnel working in accessible areas do not need Radiation Work Permits, radiation monitors, or other radiological controls. Planned use for the containment structure is as an interim transuranic waste storage facility (after conversion).

  19. Amsterdam fast neutron therapy project: a final report

    SciTech Connect

    Battermann, J.J.; Mijnheer, B.J.

    1986-12-01

    In the period from February 1975 through September 1981 a total of 435 patients received radiotherapy with the 14 MeV d + T neutron generator, hospital based in the Netherlands Cancer Institute. Preliminary data on clinical results were published during the past few years. In this paper a final report is given of the program. The results can be summarized as follows: The neutron generator fulfilled the criteria for clinical use, that is it was reliable and had the required minimal output of 10(12) neutrons s-1. However, the dose distribution was more comparable with a 250 kV X-ray machine than with a modern accelerator. A number of physical parameters of importance for clinical neutron dosimetry have been determined for our therapy unit. These data, as well as the results of dosimetry intercomparisons in which our institute participated, contributed in the drafting of a European protocol for clinical neutron dosimetry. Pilot studies were carried out on different tumor sites, including head and neck, brain, pelvis, soft tissue and pulmonary metastases. In many patients local tumor control was seen, however, often concomitant with severe complications, especially in deep seated tumors. Randomized clinical trials were carried out for head and neck tumors (in collaboration with some other European centers) and for inoperable bladder and rectal tumors. No significant difference was observed in local tumor control or late morbidity between photon and neutron irradiation for the head and neck tumors. Also the results for pelvic tumors failed to demonstrate an advantage for neutron therapy.

  20. Final report on LDRD project : advanced optical trigger systems.

    SciTech Connect

    Roose, Lars D.; Hadley, G. Ronald; Mar, Alan; Serkland, Darwin Keith; Geib, Kent Martin; Sullivan, Charles Thomas; Keeler, Gordon Arthur; Bauer, Thomas M.; Peake, Gregory Merwin; Loubriel, Guillermo Manuel; Montano, Victoria A.

    2008-09-01

    are difficult to scale and manufacture with the required uniformity. As a promising alternative to multiple discrete edge-emitting lasers, a single wafer of vertical-cavity surface-emitting lasers (VCSELs) can be lithographically patterned to achieve the desired layout of parallel line-shaped emitters, in which adjacent lasers utilize identical semiconductor material and thereby achieve a degree of intrinsic optical uniformity. Under this LDRD project, we have fabricated arrays of uncoupled circular-aperture VCSELs to approximate a line-shaped illumination pattern, achieving optical fill factors ranging from 2% to 30%. We have applied these VCSEL arrays to demonstrate single and dual parallel line-filament triggering of PCSS devices. Moreover, we have developed a better understanding of the illumination requirements for stable triggering of multiple-filament PCSS devices using VCSEL arrays. We have found that reliable triggering of multiple filaments requires matching of the turn-on time of adjacent VCSEL line-shaped-arrays to within approximately 1 ns. Additionally, we discovered that reliable triggering of PCSS devices at low voltages requires more optical power than we obtained with our first generation of VCSEL arrays. A second generation of higher-power VCSEL arrays was designed and fabricated at the end of this LDRD project, and testing with PCSS devices is currently underway (as of September 2008).

  1. A Sequenced Instructional Program in Physical Education for the Handicapped, Phase III. Producing and Disseminating Demonstration Packages. Final Report.

    ERIC Educational Resources Information Center

    Carr, Dorothy B.; Avance, Lyonel D.

    Presented is a sequenced instructional program in physical education which constitutes the third of a three-phase, 4-year project, funded by Title III, for handicapped children, preschool through high school levels, in the Los Angeles Unified School District. Described are the project setting and the following accomplishments: a curriculum guide…

  2. Final Report of the HyPER Harvester Project

    SciTech Connect

    Prasad, Nadipuram R; Ranade, Satishkuma J

    2015-11-30

    The HyPER Harvester Project resulted in the first full­scale design, fabrication and testing of two vertical­axis harvester prototypes at the Elephant Butte Irrigation District Drop 8 Station in Southern New Mexico. The design, followed by fabrication, and deployment clearly demonstrated the feasibility to manufacture and deploy harvester prototypes at low cost. While several issues common to irrigation canal systems have to be overcome, the electromechanical performance of the integrated turbine­generator system demonstrated proof­of­concept. Proof­of­concept includes 1) feasibility for using additive manufacturing techniques to fabricate Carbon­composite turbine­generator components at low cost, 2) ease of transportation and deployment, and 3) the harvester performance. The benefits of modularity were demonstrated in terms of rapid deployment at the Drop 8 Station. Scalability and adaptability were proven in terms of the custom­fitting characteristics that enabled rapid deployment. While keeping the same shape and form, the harvester can be easily adapted to any drop environment. Self­supporting ability makes the harvester design minimally intrusive on existing structures. There are two technical challenges ahead that have to be addressed. Irregular flow patterns in canal flow induce vertical oscillations due to pressure change across the impeller. Despite the nosecone in conventional Kaplan turbine design that ordinarily dampens oscillations, an effective coupling design is required to eliminate the hydrodynamic effect on the generating system. In arid areas where tumbleweed is present, a robust design to prevent trash entering the drop is required. The compact shape and form have an aesthetic appearance and appear to illustrate an environmentally friendly attribute. The systems­engineered design enables rapid manufacturing and assembly of desired size units that can be deployed at sites along U.S. waterways as small hydropower plants. There is

  3. The Carolina Bay Restoration Project - Final Report 2000-2006.

    SciTech Connect

    Barton, Christopher

    2007-12-15

    A Wetlands Mitigation Bank was established at SRS in 1997 as a compensatory alternative for unavoidable wetland losses. Prior to restoration activities, 16 sites included in the project were surveyed for the SRS Site Use system to serve as a protective covenant. Pre-restoration monitoring ended in Fall 2000, and post restoration monitoring began in the Winter/Spring of 2001. The total interior harvest in the 16 bays after harvesting the trees was 19.6 ha. The margins in the opencanopy, pine savanna margin treatments were thinned. Margins containing areas with immature forested stands (bay 5184 and portions of bay 5011) were thinned using a mechanical shredder in November 2001. Over 126 hectares were included in the study areas (interior + margin). Planting of two tree species and the transplanting of wetland grass species was successful. From field surveys, it was estimated that approximately 2700 Nyssa sylvatica and 1900 Taxodium distichum seedlings were planted in the eight forested bays resulting in an average planting density of ≈ 490 stems ha-1. One hundred seedlings of each species per bay (where available) were marked to evaluate survivability and growth. Wetland grass species were transplanted from donor sites on SRS to plots that ranged in size from 100 – 300 m2, depending on wetland size. On 0.75 and 0.6 meter centers, respectively, 2198 plugs of Panicum hemitomon and 3021 plugs Leersia hexandra were transplanted. New shoots originating from the stumps were treated with a foliar herbicide (Garlon® 4) during the summer of 2001 using backpack sprayers. Preliminary information from 2000-2004 regarding the hydrologic, vegetation and faunal response to restoration is presented in this status report.

  4. Final summary report on project 3310 marine diesel exhaust emissions (alternative fuels). Final report

    SciTech Connect

    Bentz, A.P.

    1997-09-01

    This report summarizes the results of a 5-year study to ascertain the magnitude of emission problems from Coast Guard and commercial vessels; to develop methodology applicable for use on small vessels by using portable emission analyzers, and to examine various potential means of reducing excessive emissions. During this project, the Coast Guard RD Center tested eight vessels (of six types); and the Volpe National Transportation Systems Center tested six Coast Guard vessels (of five types) operating on the West Coast. Of the 14 vessels tested, eight were found to exceed the proposed NOx limits, although some by very small amounts.

  5. March 2011 Groundwater Sampling at the Project Shoal Site (Data Validation Package)

    SciTech Connect

    2011-07-01

    The U.S. Department of Energy Office of Legacy Management conducted annual sampling at the Project Shoal Area (Shoal) in March 2011. Wells HC-1, HC-2, HC-4, HC-5, HC-6, HC-7, MV-1, MV-2 and MV-3 were sampled as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PLN/S04351, continually updated). Two extra tritium samples were collected from well HC-4, one sample (HC-4-400) was collected at about 1/3 of the purge volume (135 gallons), the second sample (HC-4-400) was collected at 2/3 of purge volume (270 gallons). These additional samples were collected prior to completing the well purging process to evaluate the effects well purging has on the analytical results. Samples were not collected from locations HC-3 and HC-8 at the direction of the S.M. Stoller Corporation site lead.

  6. User's guide for mapIMG 3--Map image re-projection software package

    USGS Publications Warehouse

    Finn, Michael P.; Mattli, David M.

    2012-01-01

    Version 0.0 (1995), Dan Steinwand, U.S. Geological Survey (USGS)/Earth Resources Observation Systems (EROS) Data Center (EDC)--Version 0.0 was a command line version for UNIX that required four arguments: the input metadata, the output metadata, the input data file, and the output destination path. Version 1.0 (2003), Stephen Posch and Michael P. Finn, USGS/Mid-Continent Mapping Center (MCMC--Version 1.0 added a GUI interface that was built using the Qt library for cross platform development. Version 1.01 (2004), Jason Trent and Michael P. Finn, USGS/MCMC--Version 1.01 suggested bounds for the parameters of each projection. Support was added for larger input files, storage of the last used input and output folders, and for TIFF/ GeoTIFF input images. Version 2.0 (2005), Robert Buehler, Jason Trent, and Michael P. Finn, USGS/National Geospatial Technical Operations Center (NGTOC)--Version 2.0 added Resampling Methods (Mean, Mode, Min, Max, and Sum), updated the GUI design, and added the viewer/pre-viewer. The metadata style was changed to XML and was switched to a new naming convention. Version 3.0 (2009), David Mattli and Michael P. Finn, USGS/Center of Excellence for Geospatial Information Science (CEGIS)--Version 3.0 brings optimized resampling methods, an updated GUI, support for less than global datasets, UTM support and the whole codebase was ported to Qt4.

  7. US Department of Energy Uranium Mill Tailings Remedial Action ground water Project. Revision 1, Version 1: Final project plan

    SciTech Connect

    Not Available

    1993-12-21

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA processing sites. The compliance strategy for the processing sites must satisfy requirements of the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1988). This scope of work will entail the following activities, on a site-specific basis: Development of a compliance strategy based upon modification of the UMTRA Surface Project remedial action plans (RAP) or development of Ground Water Project RAPs with NRC and state or tribal concurrence on the RAP; implementation of the RAP to include establishment of institutional controls, where appropriate; institution of long-term verification monitoring for transfer to a separate DOE program on or before the Project end date; and preparation of completion reports and final licensing on those sites that will be completed prior to the Project end date.

  8. An Evaluation of the Project STAR Reading Program Intervention (State Technical Assistance Resources Project). Volume II: Evaluation Final Report.

    ERIC Educational Resources Information Center

    Holowenzak, Stephen P.

    This is the second of three volumes that constitute the final evaluation report of Project STAR (State Technical Assistance Resources), an undertaking of the Maryland State Department of Education designed to help 36 elementary schools improve their reading programs. This volume is divided into five parts. The first part contains a discussion of…

  9. Project Continuity: A Handicapped Children's Early Education Project. Final Report, October 1, 1986 to September 30, 1989.

    ERIC Educational Resources Information Center

    Jackson, Barbara; Quinn, Judy

    The final report describes Project Continuity, a federally funded effort to provide continuity of care for handicapped infants with chronic illness or complex medical needs while in the acute care setting and to facilitate transition of the infant into the home environment. Goals were accomplished within the context of a family-centered…

  10. Reaching Individuals with Disabilities Early (RIDE) Project: Individuals with Disabilities Act, Non-Directed Model Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    Ohio Valley Educational Cooperative, Shelbyville, KY.

    This final report discusses the components and outcomes of the RIDE (Reaching Individuals with Disabilities Early) Project, a program that supports the inclusion of young children with disabilities in their school environments, homes, and communities. The core component of the RIDE Model, Students' Success and Inclusion in the Regular Education…

  11. The CDCC's Project No. 7: "The Education and Cultural Development of Migrants." Final Report of the Project Group.

    ERIC Educational Resources Information Center

    Council for Cultural Cooperation, Strasbourg (France).

    The final report of a project group representing the 18 member countries of the Council of Europe Council for Cultural Co-operation investigates education and cultural development of migrants. The report discusses methodology and reasons for selecting an intercultural approach to migrant education in terms of interculturalism's basic elements:…

  12. Characterization of the radon source in North-Central Florida. Final report part 1 -- Final project report; Final report part 2 -- Technical report

    SciTech Connect

    1997-12-01

    This report contains two separate parts: Characterization of the Radon Source in North-Central Florida (final report part 1 -- final project report); and Characterization of the Radon Source in North-Central Florida (technical report). The objectives were to characterize the radon 222 source in a region having a demonstrated elevated indoor radon potential and having geology, lithology, and climate that are different from those in other regions of the U.S. where radon is being studied. Radon availability and transport in this region were described. Approaches for predicting the radon potential of lands in this region were developed.

  13. The New Mexico Technology Deployment Pilot Project: A technology reinvestment project. Final report

    SciTech Connect

    1996-11-01

    The New Mexico Technology Deployment Project (NMTDP) has been in operation for slightly more than two years. As one of the original TRP projects, NMTDP had the charter to develop and validate a new model for technology extraction which emphasized focused technology collaboration, early industry involvement, and a strong dual use commercialization and productization emphasis. Taken in total, the first two years of the NMTDP have been exceptionally successful, surpassing the goals of the project. This report describes the accomplishments and evolution of the NMTDP to date and discusses the future potential of the project. Despite the end of federal funding, and a subsequent reduction in level of effort, the project partners are committed to continuation of the project.

  14. KE Basin monorail modification for the sludge removal and packaging project

    SciTech Connect

    Orbeta, C.B.

    1995-02-06

    The 105KE Basin currently stores over 1,100 metric tons of various N Reactor spent fuel in several canister forms, as well as several metric tons of sludge which must be removed. Modifications will consist of anchoring a permanent steel frame directly into the pit walls between existing columns and adding two travelling hoist rails, each capable of two directional motions. Each pit will have its own capability for targeting loads to any point inside the working areas of these pits. The structural frame designed for the monorail system at the Weasel and Tech-View pits was qualified as adequate for normal/operating loads, and dead plus live loads combined with seismic loads. The hoist operating live load is limited to 2,000 lb. The physical strength of the existing pit walls where the base plates are to be structurally anchored is unknown. The original structural drawings specified a minimum concrete strength of 3,000 lb/in{sup 2}. A pullout test should be performed to verify the strength of this concrete base. To reduce radiation exposure to levels as low as reasonably achievable (ALARA), installation and erection work inside the basin controlled area must be minimized; therefore, the pieces required for the modifications should be numbered in the fabrication shop, and erection should follow a procedure that corresponds to the assembly sequence indicated by the numbers. In conjunction with final erection, a mock-up activity should be conducted and base-plate locations verified to be within dimensional tolerances.

  15. Blade System Design Study. Part II, final project report (GEC).

    SciTech Connect

    Griffin, Dayton A.

    2009-05-01

    As part of the U.S. Department of Energy's Low Wind Speed Turbine program, Global Energy Concepts LLC (GEC)1 has studied alternative composite materials for wind turbine blades in the multi-megawatt size range. This work in one of the Blade System Design Studies (BSDS) funded through Sandia National Laboratories. The BSDS program was conducted in two phases. In the Part I BSDS, GEC assessed candidate innovations in composite materials, manufacturing processes, and structural configurations. GEC also made recommendations for testing composite coupons, details, assemblies, and blade substructures to be carried out in the Part II study (BSDS-II). The BSDS-II contract period began in May 2003, and testing was initiated in June 2004. The current report summarizes the results from the BSDS-II test program. Composite materials evaluated include carbon fiber in both pre-impregnated and vacuum-assisted resin transfer molding (VARTM) forms. Initial thin-coupon static testing included a wide range of parameters, including variation in manufacturer, fiber tow size, fabric architecture, and resin type. A smaller set of these materials and process types was also evaluated in thin-coupon fatigue testing, and in ply-drop and ply-transition panels. The majority of materials used epoxy resin, with vinyl ester (VE) resin also used for selected cases. Late in the project, testing of unidirectional fiberglass was added to provide an updated baseline against which to evaluate the carbon material performance. Numerous unidirectional carbon fabrics were considered for evaluation with VARTM infusion. All but one fabric style considered suffered either from poor infusibility or waviness of fibers combined with poor compaction. The exception was a triaxial carbon-fiberglass fabric produced by SAERTEX. This fabric became the primary choice for infused articles throughout the test program. The generally positive results obtained in this program for the SAERTEX material have led to its being

  16. Final Results From the Circumarctic Lakes Observation Network (CALON) Project

    NASA Astrophysics Data System (ADS)

    Hinkel, K. M.; Arp, C. D.; Eisner, W. R.; Frey, K. E.; Grosse, G.; Jones, B. M.; Kim, C.; Lenters, J. D.; Liu, H.; Townsend-Small, A.

    2015-12-01

    Since 2012, the physical and biogeochemical properties of ~60 lakes in northern Alaska have been investigated under CALON, a project to document landscape-scale variability of Arctic lakes in permafrost terrain. The network has ten nodes along two latitudinal transects extending inland 200 km from the Arctic Ocean. A meteorological station is deployed at each node and six representative lakes instrumented and continuously monitored, with winter and summer visits for synoptic assessment of lake conditions. Over the 4-year period, winter and summer climatology varied to create a rich range of lake responses over a short period. For example, winter 2012-13 was very cold with a thin snowpack producing thick ice across the region. Subsequent years had relatively warm winters, yet regionally variable snow resulted in differing gradients of ice thickness. Ice-out timing was unusually late in 2014 and unusually early in 2015. Lakes are typically well-mixed and largely isothermal, with minor thermal stratification occurring in deeper lakes during calm, sunny periods in summer. Lake water temperature records and morphometric data were used to estimate the ground thermal condition beneath 28 lakes. Application of a thermal equilibrium steady-state model suggests a talik penetrating the permafrost under many larger lakes, but lake geochemical data do not indicate a significant contribution of subpermafrost groundwater. Biogeochemical data reveal distinct spatial and seasonal variability in chlorophyll biomass, chromophoric dissolved organic carbon (CDOM), and major cations/anions. Generally, waters sampled beneath ice in April had distinctly higher concentrations of inorganic solutes and methane compared with August. Chlorophyll concentrations and CDOM absorption were higher in April, suggesting significant biological/biogeochemical activity under lake ice. Lakes are a positive source of methane in summer, and some also emit nitrous oxide and carbon dioxide. As part of the

  17. Mississippi Ethanol Gasification Project, Final Scientific / Technical Report

    SciTech Connect

    Pearson, Larry, E.

    2007-04-30

    The Mississippi Ethanol (ME) Project is a comprehensive effort to develop the conversion of biomass to ethanol utilizing a proprietary gasification reactor technology developed by Mississippi Ethanol, LLC. Tasks were split between operation of a 1/10 scale unit at the Diagnostic Instrumentation and Analysis Laboratory (DIAL) of Mississippi State University (MSU) and the construction, development, and operation of a full scale pilot unit located at the ME facility in Winona, Mississippi. In addition to characterization of the ME reactor gasification system, other areas considered critical to the operational and economic viability of the overall ME concept were evaluated. These areas include syngas cleanup, biological conversion of syngas to alcohol, and effects of gasification scale factors. Characterization of run data from the Pre-Pilot and Pilot Units has allowed development of the factors necessary for scale-up from the small unit to the larger unit. This scale range is approximately a factor of 10. Particulate and tar sampling gave order of magnitude values for preliminary design calculations. In addition, sampling values collected downstream of the ash removal system show significant reductions in observed loadings. These loading values indicate that acceptable particulate and tar loading rates could be attained with standard equipment additions to the existing configurations. Overall operation both the Pre-Pilot and Pilot Units proceeded very well. The Pilot Unit was operated as a system, from wood receiving to gas flaring, several times and these runs were used to address possible production-scale concerns. Among these, a pressure feed system was developed to allow feed of material against gasifier system pressure with little or no purge requirements. Similarly, a water wash system, with continuous ash collection, was developed, installed, and tested. Development of a biological system for alcohol production was conducted at Mississippi State University with

  18. Degradation mode survey candidate titanium-base alloys for Yucca Mountain project waste package materials. Revision 1

    SciTech Connect

    Gdowski, G.E.

    1997-12-01

    The Yucca Mountain Site Characterization Project (YMP) is evaluating materials from which to fabricate high-level nuclear waste containers (hereafter called waste packages) for the potential repository at Yucca Mountain, Nevada. Because of their very good corrosion resistance in aqueous environments titanium alloys are considered for container materials. Consideration of titanium alloys is understandable since about one-third (in 1978) of all titanium produced is used in applications where corrosion resistance is of primary importance. Consequently, there is a considerable amount of data which demonstrates that titanium alloys, in general, but particularly the commercial purity and dilute {alpha} grades, are highly corrosion resistant. This report will discuss the corrosion characteristics of Ti Gr 2, 7, 12, and 16. The more highly alloyed titanium alloys which were developed by adding a small Pd content to higher strength Ti alloys in order to give them better corrosion resistance will not be considered in this report. These alloys are all two phase ({alpha} and {beta}) alloys. The palladium addition while making these alloys more corrosion resistant does not give them the corrosion resistance of the single phase {alpha} and near-{alpha} (Ti Gr 12) alloys.

  19. Investigating the Chemical Reactivity for Hydrogen in Siliciclastic Sediments: two Work Packages of the H2STORE Project

    NASA Astrophysics Data System (ADS)

    De Lucia, M.; Pilz, P.

    2014-12-01

    The H2STORE ("Hydrogen to Store") collaborative project, funded by the German government, investigates the feasibility of industrial-scale hydrogen storage from excess wind energy in siliciclastic depleted gas and oil reservoirs or suitable saline aquifers. In particular, two work packages (geochemical experiments and modelling) hosted at the German Research Centre for Geosciences (GFZ) focus on the possible impact of hydrogen on formation fluids and on the mineralogical, geochemical and petrophysical properties of reservoirs and caprocks. Laboratory experiments expose core samples from several potential reservoirs to pure hydrogen or hydrogen mixtures under site-specific conditions (temperatures up to 200 °C and pressure up to 300 bar). The resulting qualitative and, whereas possible, quantitative data are expected to ameliorate the precision of predictive geochemical and reactive transport modelling, which is also performed within the project. The combination of experiments and models will improve the knowledge about: (1) solubility model and mixing rule for of hydrogen and its gas mixtures in high saline formation fluids; (2) hydrogen reactivity in a broad spectrum of P-T conditions; (3) thermodynamics and kinetics of mineral dissolution or precipitation reactions and redox processes. It is known that under specific P-T conditions reactions between hydrogen and anorganic rock components such as carbonates can occur. However these conditions have never been precisely defined to date. A precise estimation of the hydrogen impact on reservoir behavior of different siliciclastic rock types is crucial for site selection and optimization of storage depth. Enhancing the overall understanding of such systems will benefit the operational reliability, the ecological tolerance, and the economic efficiency of future energy storing plants, crucial aspects for public acceptance and for industrial investors.

  20. A final report on hydrothermal testing of sup 99 Tc-doped glass waste form and waste package components

    SciTech Connect

    Schramke, J.A.; Thomas, L.E.; McKinley, S.G.; Simonson, S.A.; Coles, D.G.; Westinghouse Hanford Co., Richland, WA; Pacific Northwest Lab., Richland, WA )

    1984-07-01

    This document reports the results of four experiments using borosilicate glass doped with the key radionuclide {sup 99}Technicium. The experiments were performed in Dickson rocking autoclaves at 200{degree}C, 30MPa pressure for 3 months. Starting materials consisted of the doped glass (+ undoped borosilicate glass){center dot} in GR-3 groundwater. To simulate various possible interactions among waste package components, the glass-groundwater starting materials were run either alone, or combined with RUE-basalt, or cast steel or both. The Dickson autocalve allowed periodic sampling of the fluid, through which concentrations of dissolved species were monitored. In the glass-only experiment, Tc concentration increased until reaching an apparent steady-state concentration of 55 mg/1 after 1000 hours. In runs with basalt, steel or both, this concentration reached steady-state at three or more orders of magnitude below that. 29 refs., 23 figs., 8 tabs.

  1. Volcanism Studies: Final Report for the Yucca Mountain Project

    SciTech Connect

    Bruce M. Crowe; Frank V. Perry; Greg A. Valentine; Lynn M. Bowker

    1998-12-01

    This report synthesizes the results of volcanism studies conducted by scientists at the Los Alamos National Laboratory and collaborating institutions on behalf of the Department of Energy's Yucca Mountain Project. An assessment of the risk of future volcanic activity is one of many site characterization studies that must be completed to evaluate the Yucca Mountain site for potential long-term storage of high-level radioactive waste. The presence of several basaltic volcanic centers in the Yucca Mountain region of Pliocene and Quaternary age indicates that there is a finite risk of a future volcanic event occurring during the 10,000-year isolation period of a potential repository. Chapter 1 introduces the volcanism issue for the Yucca Mountain site and provides the reader with an overview of the organization, content, and significant conclusions of this report. The risk of future basaltic volcanism is the primary topic of concern including both events that intersect a potential repository and events that occur near or within the waste isolation system of a repository. Future volcanic events cannot be predicted with certainty but instead are estimated using formal methods of probabilistic volcanic hazard assessment (PVHA). Chapter 2 describes the volcanic history of the Yucca Mountain region (YMR) and emphasizes the Pliocene and Quaternary volcanic record, the interval of primary concern for volcanic risk assessment. The distribution, eruptive history, and geochronology of Plio-Quaternary basalt centers are described by individual center emphasizing the younger postcaldera basalt (<5 Ma). The Lathrop Wells volcanic center is described in detail because it is the youngest basalt center in the YMR. The age of the Lathrop Wells center is now confidently determined to be about 75 thousand years old. Chapter 3 describes the tectonic setting of the YMR and presents and assesses the significance of multiple alternative tectonic models. The Crater Flat volcanic zone is

  2. Project BELIEVE. Final Report. (A National Workplace Literacy Project with Bakery Europa and Straub Clinic & Hospital).

    ERIC Educational Resources Information Center

    Zane, Lawrence F. H.

    Bakery Europa and the Straub Clinic in Hawaii participated in Project BELIEVE, a 3-year (1995-98) workplace literacy project conducted in partnership with the University of Hawaii's College of Education. Instruction focused on the literacy, communication, interpersonal, and problem-solving skills needed to succeed in the baking and health care…

  3. High occupancy vehicle project case studies: Historical trends and project experiences. Final report

    SciTech Connect

    Turnbull, K.F.

    1991-02-01

    This document represents the fourth report prepared as part of a three-year assessment of High occupancy vehicle (HOV) lane projects located either on freeways or in separate rights-of-way in North America. It provides an examination of the historical trends in use and impacts of six HOV project case studies and other HOV facilities in North America.

  4. On the design of learning outcomes for the undergraduate engineer's final year project

    NASA Astrophysics Data System (ADS)

    Thambyah, Ashvin

    2011-03-01

    The course for the final year project for engineering students, because of its strongly research-based, open-ended format, tends to not have well defined learning outcomes, which are also not aligned with any accepted pedagogical philosophy or learning technology. To address this problem, the revised Bloom's taxonomy table of Anderson and Krathwohl (2001) is utilised, as suggested previously by Lee and Lai (2007), to design new learning outcomes for the final year project course in engineering education. Based on the expectations of the engineering graduate, and integrating these graduate expectations into the six cognitive processes and four knowledge dimensions of the taxonomy table, 24 learning outcomes have been designed. It is proposed that these 24 learning outcomes be utilised as a suitable working template to inspire more critical evaluation of what is expected to be learnt by engineering students undertaking final year research or capstone projects.

  5. Packaging for Posterity.

    ERIC Educational Resources Information Center

    Sias, Jim

    1990-01-01

    A project in which students designed environmentally responsible food packaging is described. The problem definition; research on topics such as waste paper, plastic, metal, glass, incineration, recycling, and consumer preferences; and the presentation design are provided. (KR)

  6. Exxon Valdez oil spill. Subsistence restoration project. Restoration project 93017. Final report

    SciTech Connect

    1995-01-01

    The goal of the project was to restore the confidence of subsistence users in their abilities to determine the safety of their resources. Methods included community meetings, collection and testing of subsistence resource samples, accompanying community representatives on test laboratory tours and information newsletters to communities. The project was partly successful in disseminating the subsistence food safety advice of the Oil Spill Health Task Force and in improving the level of trust in the results of hydrocarbon tests on the resources.

  7. 324 Building B-Cell Pressurized Water Reactor Spent Fuel Packaging & Shipment RL Readiness Assessment Final Report [SEC 1 Thru 3

    SciTech Connect

    HUMPHREYS, D C

    2002-08-01

    A parallel readiness assessment (RA) was conducted by independent Fluor Hanford (FH) and U. S. Department of Energy, Richland Operations Office (RL) team to verify that an adequate state of readiness had been achieved for activities associated with the packaging and shipping of pressurized water reactor fuel assemblies from B-Cell in the 324 Building to the interim storage area at the Canister Storage Building in the 200 Area. The RL review was conducted in parallel with the FH review in accordance with the Joint RL/FH Implementation Plan (Appendix B). The RL RA Team members were assigned a FH RA Team counterpart for the review. With this one-on-one approach, the RL RA Team was able to assess the FH Team's performance, competence, and adherence to the implementation plan and evaluate the level of facility readiness. The RL RA Team agrees with the FH determination that startup of the 324 Building B-Cell pressurized water reactor spent nuclear fuel packaging and shipping operations can safely proceed, pending completion of the identified pre-start items in the FH final report (see Appendix A), completion of the manageable list of open items included in the facility's declaration of readiness, and execution of the startup plan to operations.

  8. A Review of Selected Microcomputer Software Packages with Lessons for Teaching Mathematics Grades 8-12. Volume 3. A Curriculum Development Project of the Project To Increase Mastery of Mathematics and Science (PIMMS).

    ERIC Educational Resources Information Center

    Cetorelli, Nancy; And Others

    The purpose of this project is to help teachers of mathematics use the computer to aid the teaching and learning of many mathematical concepts in a meaningful way. To this end, commercially available software packages are described which are versatile, cost effective, and easy to use. A review and several lessons, each including homework…

  9. User data package for implementation of electrolytic recovery technology in Navy electroplating shops. Final report, March 1993-January 1995

    SciTech Connect

    Ford, K.; Koff, J.

    1995-10-01

    In FY94 the Naval Facilities Engineering Service Center (NFESC) completed tests on three electrolytic recovery systems used for the recovery of metals and destruction of cyanide from electroplating wastewaters. Field testing and evaluation was conducted at NSY Norfolk, NAWC Indianapolis, and NADEP Cherry Pt. for five metal recovery applications: silver cyanide, copper cyanide, acid copper, electroless nickel, and tin-lead fluoborate. Advanced design features for metal recovery, including enhanced fluidized circulation, specialized oxidizing anodes, and high porous surface area cathodes were evaluated to optimize performance. NFESC demonstrated that electrolytic recovery systems can be adapted for effective use in the Navy plating operations where production is often sporadic as contrasted to industrial plating processes. The electrolytic recovery units removed metal ions from the rinsewater to below 1 ppm for each application. Electrowinning, as an alternative technology, can reduce industrial waste treatment costs and hazardous sludge generated from conventional treatment This User Data Package (UDP) covers the design, operational and maintenance requirements for these electrolytic systems. This UDP will be applicable to small Navy plating shops where closed-loop waste recycling and point source minimization is necessary for environmental compliance and cost competitiveness.

  10. Final Report. "Collaborative Project. Contributions of organic compounds to the growth of freshly nucleated atmospheric nanoparticles"

    SciTech Connect

    Smith, James N

    2015-12-23

    This is the final technical report for the portion of the project that took place at the National Center for Atmospheric Research, which covers approximately the first year of the three-year project. During this time we focused primarily on analysis and modeling of DOE-funded observations as well as preparation for laboratory studies of individual processes that contribute to atmospheric new particle formation.

  11. Inexpensive cross-flow hydropower turbine at Arbuckle Mountain Hydroelectric Project: Final construction and cost report

    SciTech Connect

    Not Available

    1988-07-01

    The Arbuckle Mountain Hydroelectric Project is a Cooperative Agreement between the US Department of Energy (DOE) and Ron and Carlene Ott. The project's purpose is to build and intensively test an inexpensive American-made cross-flow turbine and to provide information to DOE on the cost, efficiency, operation and maintenance of the unit. This final report discusses the technical and financial aspects of planning, designing, manufacturing, and installing the turbine as well as design and construction details of the site.

  12. 42 CFR 137.331 - May the Secretary reject a final construction project proposal based on a determination of Tribal...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Project Assumption Process § 137.331 May the Secretary reject a final construction project proposal based on a determination of Tribal capacity or capability? No, the Secretary may not reject a final construction project proposal based on...

  13. 42 CFR 137.331 - May the Secretary reject a final construction project proposal based on a determination of Tribal...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Project Assumption Process § 137.331 May the Secretary reject a final construction project proposal based on a determination of Tribal capacity or capability? No, the Secretary may not reject a final construction project proposal based on...

  14. 42 CFR 137.331 - May the Secretary reject a final construction project proposal based on a determination of Tribal...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Project Assumption Process § 137.331 May the Secretary reject a final construction project proposal based on a determination of Tribal capacity or capability? No, the Secretary may not reject a final construction project proposal based on...

  15. 42 CFR 137.331 - May the Secretary reject a final construction project proposal based on a determination of Tribal...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Project Assumption Process § 137.331 May the Secretary reject a final construction project proposal based on a determination of Tribal capacity or capability? No, the Secretary may not reject a final construction project proposal based on...

  16. 42 CFR 137.331 - May the Secretary reject a final construction project proposal based on a determination of Tribal...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Project Assumption Process § 137.331 May the Secretary reject a final construction project proposal based on a determination of Tribal capacity or capability? No, the Secretary may not reject a final construction project proposal based on...

  17. Hellsgate Winter Range Mitigation Project; Long-term Management Plan, Project Report 1993, Final Draft.

    SciTech Connect

    Berger, Matthew T.

    1994-01-01

    A study was conducted on the Hellsgate Winter Range Mitigation Project area, a 4,943 acre ranch purchased for mitigating some habitat losses associated with the original construction of Grand Coulee Dam and innundation of habitat by Lake Roosevelt. A Habitat Evaluation Procedure (HEP) study was used to determine habitat quality and quantity baseline data and future projections. Target species used in the study were sharp-tailed grouse (Tympanuchus phasianellus), mule deer (Odocoileus hemoinus), mink (Mustela vison), spotted sandpiper (Actiius colchicus), bobcat (Felis reufs), blue grouse (Dendragapus obscurus), and mourning dove (Zenaida macroura). From field data collected, limiting life values or HSI's (Habitat Suitability Index's) for each indicator species was determined for existing habitats on project lands. From this data a long term management plan was developed. This report is designed to provide guidance for the management of project lands in relation to the habitat cover types discussed and the indicator species used to evaluate these cover types. In addition, the plan discusses management actions, habitat enhancements, and tools that will be used to enhance, protect and restore habitats to desired conditions. Through planned management actions biodiversity and vegetative structure can be optimized over time to reduce or eliminate, limiting HSI values for selected wildlife on project lands.

  18. SOLERAS - Solar Controlled Environment Agriculture Project. Final report, Volume 1. Project summary

    SciTech Connect

    Not Available

    1985-12-30

    A summary of the Solar Controlled Environment Agriculture Project is presented. The design of the greenhouses include transparent double pane glass roof with channels for fluid between the panes, inner pane tinted and double pane extruded acrylic aluminized mylar shade and diffuser. Solar energy technologies provide power for water desalination, for pumping irrigation water, and for cooling and heating the controlled environment space so that crops can grow in arid lands. The project is a joint effort between the United States and Saudi Arabia. (BCS)

  19. Sound waste management plan. Restoration project 95115. Exxon Valdez oil spill restoration project final report

    SciTech Connect

    1996-02-01

    The project was designed to address marine pollution that is generated from landbased sources within the Prince William Sound communities of Cordova, Valdez, Whittier Tatitlek, and Chenega Bay. The project recommends ways to improve the management of three different waste streams generated within the communities and which are a chronic source of marine pollution: used oil, household hazardous waste, and solid waste. The recommendations, some of which have already been implemented, include: creation of a comprehensive used oil management system in each community, construction of Environmental Operation Stations to improve the overall management of solid and oily wastes, and the development of a regional household hazardous waste program.

  20. Robeson County Compensatory Indian Education Project. Project Evaluation and Final Report.

    ERIC Educational Resources Information Center

    Tafoya, Dennis W.; Combs, Boyd G.

    Built around a 1977 needs assessment which sampled 65% of the county Indian population, the Robeson County Title IV-A Compensatory Indian Education Project was structured into four categories of objectives: (1) Student Classroom Performance to increase academic performance; (2) Program Management and Maintenance to involve parents, educators and…

  1. Career Education Staff Development Project, 1978-1979. Final Project Report.

    ERIC Educational Resources Information Center

    Detroit Public Schools, MI.

    A project was undertaken to (1) develop a prototype for installing career education in two regions of the Detroit Public Schools through staff development activities, (2) monitor the involvement level in local schools in these regions, and (3) assist each school on an ongoing basis to plan for effective career education implementation. The first…

  2. Final Report of the Adult Competency Education Project. An Experimental Adult Basic Education Demonstration Project.

    ERIC Educational Resources Information Center

    San Mateo County Office of Education, Redwood City, CA. Career Preparation Centers.

    The Adult Competency Education (ACE) Project sought to define basic job-related skills and tasks for the development of instructional programs. The programs included a vocational counseling component to assist students in establishing skills needed to increase employability. In phase 1 the 100 entry-level jobs most frequently occurring in San…

  3. Final report for the DOE Suede Project, (solar utilization/economic development and employment project)

    SciTech Connect

    Katz, G.; Zahigian, E. Jr.

    1983-10-19

    The purpose of this solar energy project was to design, manufacture, install, maintain and evaluate solar heating systems in order to stimulate community acceptance of the practicality of solar applications, reduce non-renewable energy resource consumption, and decrease residential expenditures for energy. The project also provided skill training and experience for CETA employees in the design, manufacture, and installation of solar energy equipment systems. CDC's contract had four separate solar energy projects; namely: Domestic Water Heating Systems for four Single-Family Homes; Domestic Water Heating for an industrial building; Domestic Water Heating for a (4) unit apartment complex (includes (12) supplemental space heating units); and Integral Passive Water Heaters and Energy Conservation Devices for (8) one bedroom homes. CDC staff designed all solar systems and CETA trainees (County and City vocational training program enrollees) under staff guidance manufactured, installed, and maintained all the solar energy systems. This report describes each of the energy projects and explains the design, manufacture and installation of each system. Each system is evaluated on the basis of energy savings, aquisition and maintenance costs, operation, service requirements and reliability.

  4. Project CAREER/Guidance. Research and Development Project in Career Education. Final Report.

    ERIC Educational Resources Information Center

    Lamo, Vincent P.

    Goals, objectives, activities, and accomplishments of the guidance component of Project CAREER (Computer Assisted Research for Educational Relevance) are documented in the report. The purpose of the component was to develop a series of transportable models for enhancing career awareness, career exploration, and career-skill development at the…

  5. The Study of Project Exodus: A School Racial Integration Project in Boston, Massachusetts. Final Report.

    ERIC Educational Resources Information Center

    Teele, James E.

    This voluntary school integration project uses the open enrollment plan of the Boston School Department in transporting Negro children from predominantly Negro schools in the black district to more racially balanced schools in other parts of Boston. It has involved private financing, intra-city bussing, and the initiative and participation of…

  6. Phase II Final Project Report SBIR Project: "A High Efficiency PV to Hydrogen Energy System"

    SciTech Connect

    Slade, A; Turner, J; Stone, K; McConnell, R

    2008-09-02

    The innovative research conducted for this project contributed greatly to the understanding of generating low-cost hydrogen from solar energy. The project’s research identified two highly leveraging and complementary pathways. The first pathway is to dramatically increase the efficiency of converting sunlight into electricity. Improving solar electric conversion efficiency directly increases hydrogen production. This project produced a world record efficiency for silicon solar cells and contributed to another world record efficiency for a solar concentrator module using multijunction solar cells. The project’s literature review identified a second pathway in which wasted heat from the solar concentration process augments the electrolysis process generating hydrogen. One way to do this is to use a “heat mirror” that reflects the heat-producing infrared and transmits the visible spectrum to the solar cells; this also increases solar cell conversion efficiency. An economic analysis of this concept confirms that, if long-term concentrator photovoltaic (CPV) and solid-oxide electrolyzer cost goals can be achieved, hydrogen will be produced from solar energy cheaper than the cost of gasoline. The potential public benefits from this project are significant. The project has identified a potential energy source for the nation’s future electricity and transportation needs that is entirely “home grown” and carbon free. As CPV enter the nation’s utility markets, the opportunity for this approach to be successful is greatly increased. Amonix strongly recommends further exploration of this project’s findings.

  7. Zoo Project for Handicapped Children: Language Development Through Animal Utilization. Final Project Report.

    ERIC Educational Resources Information Center

    San Diego Unified School District, CA.

    The report examines the 1972-73 dissemination program of San Diego's Zoo Project for Handicapped Children which was designed to stimulate language arts improvement in mentally or educationally handicapped students by using animals at the zoo site and in schools. The following program objectives are identified: to encourage and the…

  8. They Said It Couldn't Be Done: Student Services Program Review Project Final Report.

    ERIC Educational Resources Information Center

    1986

    This report contains the final products of the Student Services Program Review Project (SSPRP), which was designed to develop evaluation models to measure the efficacy of the various student services programs provided by the California community colleges. The first sections of the report offer introductory information on the goals and activities…

  9. 76 FR 77301 - Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-12

    ... third lane in both directions on US 18/151 from the CTH PD interchange to the Raymond Road intersection... regional traffic by constructing a depressed freeway down the center of Verona Road. A US 151/18 system... Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway Project...

  10. Aerobic Excercise and Research Opportunities to Benefit Impaired Children. (Project AEROBIC). Final Report.

    ERIC Educational Resources Information Center

    Idaho Univ., Moscow.

    The final report summarizes accomplishments of Project AEROBIC (Aerobic Exercise and Research Opportunities to Benefit Impaired Children), which provided a physical education exercise program for severely, profoundly, and multiply handicapped children aged 10-21. Activities are outlined for the 3 year period and include modification of exercise…

  11. 77 FR 40601 - Final Priority: Disability and Rehabilitation Research Projects and Centers Program; Disability...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ... on February 15, 2006 (71 FR 8165), can be accessed on the Internet at the following site: www.ed.gov... notice of proposed priority for this program in the Federal Register on April 26, 2012 (77 FR 24934... Final Priority: Disability and Rehabilitation Research Projects and Centers Program;...

  12. 39. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii, T.H., by Merel S. Sager, Resident Landscape Architect, April 16, 1935. COVERING CONSPICOUS ROCK FILLS WITH SOIL. - Haleakala National Park Roads, Pukalani, Maui County, HI

  13. 34. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii, H.L. Handley, Assistant Highway Engineer, March 30, 1935. NOTE HOW THE LOCATION FITS THE CONTOUR OF THE HILL. LOOKING FROM STATION 382+00 ON HALEAKALA HIGHWAY. - Haleakala National Park Roads, Pukalani, Maui County, HI

  14. On the Design of Learning Outcomes for the Undergraduate Engineer's Final Year Project

    ERIC Educational Resources Information Center

    Thambyah, Ashvin

    2011-01-01

    The course for the final year project for engineering students, because of its strongly research-based, open-ended format, tends to not have well defined learning outcomes, which are also not aligned with any accepted pedagogical philosophy or learning technology. To address this problem, the revised Bloom's taxonomy table of Anderson and…

  15. Future Directions: Final Report of the Migrant Education Secondary Assistance Project.

    ERIC Educational Resources Information Center

    State Univ. of New York, Geneseo. Coll. at Geneseo. Migrant Center.

    Based on research by the Migrant Education Secondary Assistance (MESA) project, this report presents final recommendations for the improvement of migrant student graduation rates and secondary education. The strongest areas of need revealed in MESA findings were: (1) better identification and recruitment of secondary migrant students and dropouts;…

  16. Project DECISION: Audiovisual-Tutorial Career Education for the High School Student. Final Report.

    ERIC Educational Resources Information Center

    Waukesha County Technical Inst., Waukesha, WI.

    The final report describes "Project Decision", an exemplary program designed and implemented by the Waukesha County Technical Institute (WCTI) for the 17 high schools in Waukesha County, Wisconsin. "Career libraries" were established in each high school, with an audiovisual-tutorial device and 29 filmstrips providing information on careers and…

  17. MAVA [Massachusetts Association of Vocational Administrators] 1972 Summer Workshops and Professional Improvement Project. Final Report.

    ERIC Educational Resources Information Center

    Massachusetts State Dept. of Education, Boston. Div. of Occupational Education.

    The Massachusetts Association of Vocational Administrators (MAVA), with the assistance of the State Division of Occupational Education, developed a series of four-day, in service workshops aimed at vocational teachers throughout the State, and the document provides a final report of this project's first year. Part One covers general information…

  18. Project CREATE Final Report. Cooperative Resources To Enhance Access to Technology Education.

    ERIC Educational Resources Information Center

    Hampden County Employment and Training Consortium, Springfield, MA.

    These materials have been developed by Project CREATE (Cooperative Resources to Enhance Access to Jobs through Technical Education), a demonstration program designed to develop a network, specific activities, and resources that would provide education and support services to a wide audience. A 13-page final report describes the hands-on training…

  19. Project S.P.I.C.E.: Special Partnership in Career Education. Final Report.

    ERIC Educational Resources Information Center

    Emerson, Debby H.; And Others

    The final report discusses Project SPICE (Special Partnership in Career Education) which produced a career awareness curriculum consisting of an implementation guide, and six teaching modules intended for use with educable mentally handicapped students (ages 11-to-13 years). Noted are the following program objectives (based on the National…

  20. Phase 5 storage (Project W-112) Central Waste Complex operational readiness review, final report

    SciTech Connect

    Wight, R.H.

    1997-05-30

    This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included.