Sample records for partial interim review

  1. A Treatment Protocol for Restoring Occlusal Vertical Dimension Using an Overlay Removable Partial Denture as an Alternative to Extensive Fixed Restorations: A Clinical Report

    PubMed Central

    Patel, Mit B; Bencharit, Sompop

    2009-01-01

    Treatment options for patients with severe attrition resulting in reduced occlusal vertical dimension are often limited to fixed prosthesis to reestablish proper occlusal vertical dimension and functional occlusion. In some cases such as when there are limited finances, minimal esthetic concerns, and medical considerations fixed prosthesis may not be the ideal treatment option. Overlay removable partial dentures (ORPDs) can be used as a provisional or interim prosthesis as well as permanent prosthesis in these cases. While ORPDs can provide a reversible and relatively inexpensive treatment for patients with a significantly compromised dental status, there is not much scientific evidence in the literature on ORPDs. Most studies published on ORPDs to date are primarily reviews and clinical reports. In this article, literatures on ORPDs are summarized and a patient treated with interim and permanent ORPDs is presented. This article reviews previously published literatures on the use of ORPDs. Indications, advantages and disadvantages are discussed. Treatment protocol with an example of the prosthodontic treatment of a patient with severely worn dentition with an interim ORPD and later a permanent ORPD are discussed in details. PMID:19915723

  2. Research toward Multi-site Characterization of Sky Obscuration by Clouds

    DTIC Science & Technology

    2009-07-01

    Oct 07 interim moonlight algorithm in comparison with the May 08 version that was fielded. This talk also includes movies that are perhaps the most...starlight, and new results for moonlight with partially 58 completed algorithm, for Site 5, and past transmittance results. Reviewed day alg results...per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and

  3. 40 CFR 155.56 - Interim registration review decision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Interim registration review decision... PROGRAMS REGISTRATION STANDARDS AND REGISTRATION REVIEW Registration Review Procedures § 155.56 Interim registration review decision. The Agency may issue, when it determines it to be appropriate, an interim...

  4. 17 CFR 210.8-03 - Interim financial statements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... (§ 249.308(a) of this chapter) must be reviewed by an independent public accountant using professional... interim financial statements have been reviewed by an independent public accountant, a report of the accountant on the review must be filed with the interim financial statements. Interim financial statements...

  5. 77 FR 15818 - License Renewal Interim Staff Guidance LR-ISG-2011-05: Ongoing Review of Operating Experience

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-16

    ...-05: Ongoing Review of Operating Experience AGENCY: Nuclear Regulatory Commission. ACTION: Interim... License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-05, ``Ongoing Review of Operating Experience... industry-wide operating experience as an attribute of aging management programs used at nuclear power...

  6. Interim overdentures.

    PubMed

    Fenton, A H

    1976-07-01

    The construction of an interim overdenture using existing removable partial dentures with natural tooth crowns and artificial teeth can be a simple and economical method of providing patients with dentures while tissues heal and teeth are prepared and restored. A more definite prognosis for both the patient and his remaining dentition can be established before the final overdenture is completed. The procedures necessary to provide three types of interim overdentures have been outlined. Patients tolerate this method of changing their dentitions extremely well.

  7. International validation study for interim PET in ABVD-treated, advanced-stage hodgkin lymphoma: interpretation criteria and concordance rate among reviewers.

    PubMed

    Biggi, Alberto; Gallamini, Andrea; Chauvie, Stephane; Hutchings, Martin; Kostakoglu, Lale; Gregianin, Michele; Meignan, Michel; Malkowski, Bogdan; Hofman, Michael S; Barrington, Sally F

    2013-05-01

    At present, there are no standard criteria that have been validated for interim PET reporting in lymphoma. In 2009, an international workshop attended by hematologists and nuclear medicine experts in Deauville, France, proposed to develop simple and reproducible rules for interim PET reporting in lymphoma. Accordingly, an international validation study was undertaken with the primary aim of validating the prognostic role of interim PET using the Deauville 5-point score to evaluate images and with the secondary aim of measuring concordance rates among reviewers using the same 5-point score. This paper focuses on the criteria for interpretation of interim PET and on concordance rates. A cohort of advanced-stage Hodgkin lymphoma patients treated with doxorubicin, bleomycin, vinblastine, and dacarbazine (ABVD) were enrolled retrospectively from centers worldwide. Baseline and interim scans were reviewed by an international panel of 6 nuclear medicine experts using the 5-point score. Complete scan datasets of acceptable diagnostic quality were available for 260 of 440 (59%) enrolled patients. Independent agreement among reviewers was reached on 252 of 260 patients (97%), for whom at least 4 reviewers agreed the findings were negative (score of 1-3) or positive (score of 4-5). After discussion, consensus was reached in all cases. There were 45 of 260 patients (17%) with positive interim PET findings and 215 of 260 patients (83%) with negative interim PET findings. Thirty-three interim PET-positive scans were true-positive, and 12 were false-positive. Two hundred three interim PET-negative scans were true-negative, and 12 were false-negative. Sensitivity, specificity, and accuracy were 0.73, 0.94, and 0.91, respectively. Negative predictive value and positive predictive value were 0.94 and 0.73, respectively. The 3-y failure-free survival was 83%, 28%, and 95% for the entire population and for interim PET-positive and -negative patients, respectively (P < 0.0001). The agreement between pairs of reviewers was good or very good, ranging from 0.69 to 0.84 as measured with the Cohen kappa. Overall agreement was good at 0.76 as measured with the Krippendorf α. The 5-point score proposed at Deauville for reviewing interim PET scans in advanced Hodgkin lymphoma is accurate and reproducible enough to be accepted as a standard reporting criterion in clinical practice and for clinical trials.

  8. Registration Review Schedules

    EPA Pesticide Factsheets

    This schedule indicates plans for completion of risk assessments, proposed interim decisions and interim decisions for pesticides in the Registration Review program, EPA reviews all registered pesticides at least every 15 years as required by FIFRA.

  9. 76 FR 59066 - Notice of Regulatory Review Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-23

    ... [No. 2011-N-10] Notice of Regulatory Review Plan AGENCY: Federal Housing Finance Agency. ACTION... of and requesting comments on the FHFA interim regulatory review plan for review of existing... comments on all aspects of the interim regulatory review plan, including legal and policy considerations...

  10. 18 CFR 300.20 - Interim acceptance and review of Bonneville Power Administration rates.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Interim acceptance and review of Bonneville Power Administration rates. 300.20 Section 300.20 Conservation of Power and Water... Director of the Office of Energy Market Regulation; or (ii) Deny the Administrator's interim rate request...

  11. 78 FR 53183 - Request for Public Comments Regarding the Interim Environmental Review of the Trans-Pacific...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-28

    ... Agreement (TPP). The interim environmental review will be available at: http://www.ustr.gov/trade-topics... available at: http://www.ustr.gov/trade-topics/environment/environmental-reviews . The purpose of...

  12. Publishing interim results of randomised clinical trials in peer-reviewed journals.

    PubMed

    Counsell, Nicholas; Biri, Despina; Fraczek, Joanna; Hackshaw, Allan

    2017-02-01

    Interim analyses of randomised controlled trials are sometimes published before the final results are available. In several cases, the treatment effects were noticeably different after patient recruitment and follow-up completed. We therefore conducted a literature review of peer-reviewed journals to compare the reported treatment effects between interim and final publications and to examine the magnitude of the difference. We performed an electronic search of MEDLINE from 1990 to 2014 (keywords: 'clinical trial' OR 'clinical study' AND 'random*' AND 'interim' OR 'preliminary'), and we manually identified the corresponding final publication. Where the electronic search produced a final report in which the abstract cited interim results, we found the interim publication. We also manually searched every randomised controlled trial in eight journals, covering a range of impact factors and general medical and specialist publications (1996-2014). All paired articles were checked to ensure that the same comparison between interventions was available in both. In all, 63 studies are included in our review, and the same quantitative comparison was available in 58 of these. The final treatment effects were smaller than the interim ones in 39 (67%) trials and the same size or larger in 19 (33%). There was a marked reduction, defined as a ≥20% decrease in the size of the treatment effect from interim to final analysis, in 11 (19%) trials compared to a marked increase in 3 (5%), p = 0.057. The magnitude of percentage change was larger in trials where commercial support was reported, and increased as the proportion of final events at the interim report decreased in trials where commercial support was reported (interaction p = 0.023). There was no evidence of a difference between trials that stopped recruitment at the interim analysis where this was reported as being pre-specified versus those that were not pre-specified (interaction p = 0.87). Published interim trial results were more likely to be associated with larger treatment effects than those based on the final report. Publishing interim results should be discouraged, in order to have reliable estimates of treatment effects for clinical decision-making, regulatory authority reviews and health economic analyses. Our work should be expanded to include conference publications and manual searches of additional journal publications.

  13. WWC Review of the Report "The Impact of Indiana's System of Interim Assessments on Mathematics and Reading." What Works Clearinghouse Single Study Review

    ERIC Educational Resources Information Center

    What Works Clearinghouse, 2015

    2015-01-01

    The study, "The Impact of Indiana's System of Interim Assessments on Mathematics and Reading," examined the effects of using Diagnostic Assessment Tools (DAT) on mathematics and reading outcomes for students in 59 Indiana schools during the 2009-10 academic year. DAT consists of interim assessment tools--Wireless Generation's mCLASS for…

  14. 75 FR 47444 - Amendments to the Informal and Other Procedures, Rules of Organization and Program Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-06

    ... Practice; Interim Commission Review of Public Company Accounting Oversight Board Inspection Reports and... facilitate interim Commission review of Public Company Accounting Oversight Board [[Page 47445

  15. 75 FR 52597 - Availability of Interim Procedures for Federal External Review and Model Notices Relating to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-26

    ... Availability of Interim Procedures for Federal External Review and Model Notices Relating to Internal Claims... procedures for the Federal external review process and model notices both for internal claims and appeals and... (3) A notice of final external review decision. Model language for the description of the internal...

  16. Interim Letter Report - Verification Survey of Partial Grid E9, David Witherspoon, Inc. 1630 Site Knoxville, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    P.C. Weaver

    2008-06-12

    Conduct verification surveys of available grids at the DWI 1630 in Knoxville, Tennessee. A representative with the Independent Environmental Assessment and Verification (IEAV) team from ORISE conducted a verification survey of a partial area within Grid E9.

  17. 76 FR 17159 - Office of New Reactors; Final Interim Staff Guidance on Standard Review Plan, Section 17.4...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-28

    ... Interim Staff Guidance on Standard Review Plan, Section 17.4, ``Reliability Assurance Program'' AGENCY... design reliability assurance program (RAP). This ISG updates the guidance provided to the staff in Standard Review Plan (SRP), Section 17.4, ``Reliability Assurance Program,'' of NUREG-0800, ``Standard...

  18. 17 CFR 210.10-01 - Interim financial statements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... accountant on the review must be filed with the interim financial statements. (e) Filing of other interim... sheets shall include only major captions (i.e., numbered captions) prescribed by the applicable sections... the date of any material accounting change and the reasons for making it. In addition, for filings on...

  19. 78 FR 48503 - Proposed Revision to Missiles Generated by Extreme Winds

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-08

    ...-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR..., ``Design-Basis Hurricane and Hurricane Missiles for Nuclear Power Plants,'' and Interim Staff Guidance DC... and Hurricane Missiles for Nuclear Power Plants'' (ADAMS, Accession No. ML110940300), and Interim...

  20. 75 FR 65528 - Membership of the National Science Board's Senior Executive Service Performance Review Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-25

    ...: Comments should be addressed to Interim Director, Division of Human Resource Management and Chief Human.... Judith S. Sunley, Interim Director, Division of Human Resource Management and Chief Human Capital Officer..., Interim Director, Division of Human Resource Management and Chief Human Capital Officer. [FR Doc. 2010...

  1. Digital approach to planning computer-guided surgery and immediate provisionalization in a partially edentulous patient.

    PubMed

    Arunyanak, Sirikarn P; Harris, Bryan T; Grant, Gerald T; Morton, Dean; Lin, Wei-Shao

    2016-07-01

    This report describes a digital approach for computer-guided surgery and immediate provisionalization in a partially edentulous patient. With diagnostic data obtained from cone-beam computed tomography and intraoral digital diagnostic scans, a digital pathway of virtual diagnostic waxing, a virtual prosthetically driven surgical plan, a computer-aided design and computer-aided manufacturing (CAD/CAM) surgical template, and implant-supported screw-retained interim restorations were realized with various open-architecture CAD/CAM systems. The optional CAD/CAM diagnostic casts with planned implant placement were also additively manufactured to facilitate preoperative inspection of the surgical template and customization of the CAD/CAM-fabricated interim restorations. Copyright © 2016 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  2. Interim Letter Report - Verification Survey of Partial Grids H19, J21, J22, X20, and X21 at the David Witherspoon, Inc. 1630 Site, Knoxville Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    P.C. Weaver

    2008-03-19

    Conduct verification surveys of available grids at the David Witherspoon Incorporated 1630 Site (DWI 1630) in Knoxville, Tennessee. The IVT conducted verification activities of partial grids H19, J21, J22, X20, and X21.

  3. 78 FR 63276 - Interim Policy, FAA Review of Solar Energy System Projects on Federally Obligated Airports

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-23

    .... Background There is growing interest in installing solar photovoltaic (PV) and solar hot water (SHW) systems on airports. While solar PV or SHW systems (henceforth referred to as solar energy systems) are... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Interim Policy, FAA Review of Solar...

  4. 76 FR 58311 - Draft License Renewal Interim Staff Guidance LR-ISG-2011-05; Ongoing Review of Operating Experience

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-20

    ... nuclear power plants. In response to a request from the Nuclear Energy Institute (NEI), the NRC is... NUCLEAR REGULATORY COMMISSION [NRC-2011-0191] Draft License Renewal Interim Staff Guidance LR-ISG-2011-05; Ongoing Review of Operating Experience AGENCY: Nuclear Regulatory Commission. ACTION: Draft...

  5. Dissolution of cement, root caries, fracture, and retrofit of post and cores.

    PubMed

    Rosen, H

    1998-10-01

    Fixed partial denture abutments severely damaged by dental caries or fracture present a challenge to the dentist. The fixed partial denture may need to be removed for endodontic treatment with post and core fabrication. Frequently, the existing fixed partial denture can be recycled as a provisional restoration. Retrofitting the post and core greatly improves the stabilization of the interim as well as the remake of the definitive fixed partial denture. This article describes a chair side procedure for retrofitting posts and cores and, at the same appointment, converting the original fixed partial denture to an effective provisional restoration.

  6. A Review of Standards of Practice for Beginning Teaching. ACER Policy Briefs. Issue 4

    ERIC Educational Resources Information Center

    Ingvarson, Lawrence; Kleinhenz, Elizabeth

    2003-01-01

    This paper aims to provide a critical review and comparison of the following sets of standards of practice for teachers: (1) The Victorian Interim Teacher Class Standards (ITCS), especially Interim Teacher Class Standards for Beginning Teachers; (2) Professional Standards for Teachers; (3) The National Competencies for Beginning Teaching; (4) The…

  7. Interim Testing, Socio-Economic Status, and the Odds of Passing Grade 8 State Tests in New Jersey

    ERIC Educational Resources Information Center

    Babo, Gerard; Tienken, Christopher H.; Gencarelli, Maria A.

    2014-01-01

    A review of the literature pertaining to the effect and influence of commercially-prepared interim assessments in mathematics and language arts literacy reveals a lack of quantitative data to determine the value of these products for school reform. This study examined the ability of commercially-prepared interim pretest and posttest assessments in…

  8. 42 CFR Appendix to Subpart G of... - Interim Procedures and Criteria for Review by Health Systems Agencies of Applications Under...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Interim Procedures and Criteria for Review by Health Systems Agencies of Applications Under Section 1625 of the Public Health Service Act Appendix to Subpart G of Part 124 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH...

  9. 42 CFR Appendix to Subpart G of... - Interim Procedures and Criteria for Review by Health Systems Agencies of Applications Under...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Interim Procedures and Criteria for Review by Health Systems Agencies of Applications Under Section 1625 of the Public Health Service Act Appendix to Subpart G of Part 124 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH...

  10. A systematic review of the reporting of Data Monitoring Committees' roles, interim analysis and early termination in pediatric clinical trials

    PubMed Central

    2009-01-01

    Background Decisions about interim analysis and early stopping of clinical trials, as based on recommendations of Data Monitoring Committees (DMCs), have far reaching consequences for the scientific validity and clinical impact of a trial. Our aim was to evaluate the frequency and quality of the reporting on DMC composition and roles, interim analysis and early termination in pediatric trials. Methods We conducted a systematic review of randomized controlled clinical trials published from 2005 to 2007 in a sample of four general and four pediatric journals. We used full-text databases to identify trials which reported on DMCs, interim analysis or early termination, and included children or adolescents. Information was extracted on general trial characteristics, risk of bias, and a set of parameters regarding DMC composition and roles, interim analysis and early termination. Results 110 of the 648 pediatric trials in this sample (17%) reported on DMC or interim analysis or early stopping, and were included; 68 from general and 42 from pediatric journals. The presence of DMCs was reported in 89 of the 110 included trials (81%); 62 papers, including 46 of the 89 that reported on DMCs (52%), also presented information about interim analysis. No paper adequately reported all DMC parameters, and nine (15%) reported all interim analysis details. Of 32 trials which terminated early, 22 (69%) did not report predefined stopping guidelines and 15 (47%) did not provide information on statistical monitoring methods. Conclusions Reporting on DMC composition and roles, on interim analysis results and on early termination of pediatric trials is incomplete and heterogeneous. We propose a minimal set of reporting parameters that will allow the reader to assess the validity of trial results. PMID:20003383

  11. Accelerated treatment protocols: full arch treatment with interim and definitive prostheses.

    PubMed

    Drago, Carl

    2012-01-01

    With the advent of titanium, root form implants and osseointegration, dental treatment has undergone a metamorphosis in recent years. These new techniques enable dentists to provide anchorage for various kinds of prostheses that improve masticatory function, esthetics, and comfort for patients. Implant treatment protocols have been improved relative to implant macro- and micro-geometries, surgical and prosthetic components, and treatment times. Over the past 20 years, immediate occlusal function (also known as loading) has been established as a predictable treatment modality, provided certain specific criteria are met. In many cases, edentulous patients, crippled by the loss of their teeth, can undergo outpatient surgical and prosthetic procedures and return to a masticatory function that is near normal--sometimes after only one day of surgical and prosthetic treatment. This treatment option is also available for patients with advanced, generalized periodontal disease. Computer-assisted design/Computer-assisted manufacturing (CAD/CAM) has transformed how dental prostheses are made, offering improved accuracy, longevity, and biocompatibility; along with reduced labor costs and fewer complications than casting technologies. This article reviews the principles associated with immediate occlusal loading and illustrates one specific accelerated prosthodontic treatment protocol used to treat edentulous and partially edentulous patients with interim and definitive prostheses.

  12. WWC Review of the Report "The Impact of Indiana's System of Interim Assessments on Mathematics and Reading Achievement." What Works Clearinghouse Single Study Review

    ERIC Educational Resources Information Center

    What Works Clearinghouse, 2015

    2015-01-01

    The study authors examined the effects of using "Diagnostic Assessment Tools" ("DAT") on mathematics and reading outcomes for students in Indiana schools during the 2009-10 academic year. "DAT" consists of interim assessment tools--Wireless Generation's mCLASS for students in grades K-2 and CTB/ McGraw-Hill's Acuity…

  13. Negative pressure wound therapy for partial-thickness burns.

    PubMed

    Dumville, Jo C; Munson, Christopher; Christie, Janice

    2014-12-15

    A burn wound is a complex and evolving injury, with both local and systemic consequences. Burn treatments include a variety of dressings, as well as newer strategies, such as negative pressure wound therapy (NPWT), which, by means of a suction force that drains excess fluids from the burn, tries to promote the wound healing process and minimise progression of the burn wound. To assess the effectiveness of NPWT for people with partial-thickness burns. We searched the Cochrane Wounds Group Specialised Register (searched 04 September 2014); The Cochrane Central Register of Controlled Trials (CENTRAL) (The Cochrane Library 2014, Issue 8). All randomised controlled trials (RCTs) and controlled clinical trials (CCTs) that evaluated the safety and effectiveness of NPWT for partial-thickness burns. Two review authors used standardised forms, and extracted the data independently. We assessed each trial for risk of bias, and resolved differences by discussion. One RCT, that was an interim report, satisfied the inclusion criteria. We undertook a narrative synthesis of results, as the absence of data and poor reporting precluded us from carrying out any formal statistical analysis. The trial was at high risk of bias. There was not enough evidence available to permit any conclusions to be drawn regarding the use of NPWT for treatment of partial-thickness burn wounds.

  14. Evaluation of experimental rumble strip areas in Louisiana : interim report No. 1.

    DOT National Transportation Integrated Search

    1985-03-01

    This interim report was prepared to provide a review of nineteen rumble strip areas installed experimentally in Louisiana between August 1982 and September 1983. Situated randomly throughout central and southern Louisiana, construction of these coars...

  15. Hazardous waste management programs; Florida: authorization for interim authorization phase I--Environmental Protection Agency. Notice of final determination.

    PubMed

    1982-05-07

    The State of Florida has applied for interim Authorization Phase I. EPA has reviewed Florida's application for Phase I and has determined that Florida's hazardous waste program is substantially equivalent to the Federal program covered by Phase I. The State of Florida is, hereby, granted Interim Authorization for Phase I to operate the State 's hazardous waste program, in lieu of the Federal program.

  16. Prognostic value of interim FDG-PET in R-CHOP-treated diffuse large B-cell lymphoma: Systematic review and meta-analysis.

    PubMed

    Adams, Hugo J A; Kwee, Thomas C

    2016-10-01

    This study aimed to systematically review and meta-analyze the prognostic value of interim (18)F-fluoro-2-deoxy-d-glucose positron emission tomography (FDG-PET) in diffuse large B-cell lymphoma (DLBCL) patients treated with rituximab, cyclophosphamide, doxorubicin, vincristine, and prednisolone (R-CHOP). MEDLINE and EMBASE were systematically searched for suitable studies. Included studies were methodologically appraised, and results were summarized both descriptively and meta-analytically. Nine studies, comprising a total of 996 R-CHOP-treated DLBCL patients, were included. Overall, studies were of moderate methodological quality. The area under the summary receiver operating curve (AUC) of interim FDG-PET in predicting treatment failure and death were 0.651 and 0.817, respectively. There was no heterogeneity in diagnostic odds ratios across available studies (I(2)=0.0%). At multivariable analysis, 2 studies reported interim FDG-PET to have independent prognostic value in addition to the International Prognostic Index (IPI) in predicting treatment failure, whereas 3 studies reported that this was not the case. One study reported interim FDG-PET to have independent prognostic value in addition to the IPI in predicting death, whereas 2 studies reported that this was not the case. In conclusion, interim FDG-PET in R-CHOP-treated DLBCL has some correlation with outcome, but its prognostic value is homogeneously suboptimal across studies and it has not consistently proven to surpass the prognostic potential of the IPI. Moreover, there is a lack of studies that compared interim FDG-PET to the recently developed and superior National Comprehensive Cancer Network-IPI. Therefore, at present there is no scientific base to support the clinical use of interim FDG-PET in R-CHOP-treated DLBCL. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  17. The role of the Data and Safety Monitoring Board in a clinical trial: The CRISIS Study

    PubMed Central

    Holubkov, Richard; Casper, T. Charles; Dean, J. Michael; Anand, K. J. S.; Zimmerman, Jerry; Meert, Kathleen L.; Newth, Christopher J. L.; Berger, John; Harrison, Rick; Willson, Douglas F.; Nicholson, Carol

    2012-01-01

    Objective Randomized clinical trials are commonly overseen by a data and safety monitoring board (DSMB) comprised of experts in medicine, ethics, and biostatistics. DSMB responsibilities include protocol approval, interim review of study enrollment, protocol compliance, safety, and efficacy data. DSMB decisions can affect study design and conduct, as well as reported findings. Researchers must incorporate DSMB oversight into the design, monitoring, and reporting of randomized trials. Design Case study, narrative review. Methods The DSMB’s role during the comparative pediatric Critical Illness Stress-Induced Immune Suppression (CRISIS) Prevention Trial is described. Findings The NIH-appointed CRISIS DSMB was charged with monitoring sample size adequacy and feasibility, safety with respect to adverse events and 28-day mortality, and efficacy with respect to the primary nosocomial infection/sepsis outcome. The Federal Drug Administration also requested DSMB interim review before opening CRISIS to children below one year of age. The first interim analysis found higher 28-day mortality in one treatment arm. The DSMB maintained trial closure to younger children, and requested a second interim data review six months later. At this second meeting, mortality was no longer of concern, while a weak efficacy trend of lower infection/sepsis rates in one study arm emerged. As over 40% of total patients had been enrolled, the DSMB elected to examine conditional power, and unmask treatment arm identities. Upon finding somewhat greater efficacy in the placebo arm, the DSMB recommended stopping CRISIS due to futility. Conclusions The design and operating procedures of a multicenter randomized trial must consider a pivotal DSMB role. Maximum study design flexibility must be allowed, and investigators must be prepared for protocol modifications due to interim findings. The DSMB must have sufficient clinical and statistical expertise to assess potential importance of interim treatment differences in the setting of multiple looks at accumulating data with numerous outcomes and subgroups. PMID:23392377

  18. Evaluation of experimental railroad-highway grade crossings in Louisiana : interim report No. 5.

    DOT National Transportation Integrated Search

    1980-04-01

    This interim report is prepared to provide a review of the performance evaluation exhibited on twenty-three (23) experimental railroad-highway grade-crossing projects in the state of Louisiana. The railroad crossings were installed during a ten-year ...

  19. Interim Budget Plan.

    ERIC Educational Resources Information Center

    Office of Student Financial Assistance (ED), Washington, DC.

    This report provides the interim budget plan of the U.S. Department of Education's Office of Student Financial Assistance (OSFA) for fiscal year 2000. It reviews factors influencing OSFA's budget request, including legislative requirements, recent accomplishments, the need to maintain both the Direct Loan and Federal Family Education Loan…

  20. Laboratory evaluation of flyash treated embankment and base materials : interim report No. 1.

    DOT National Transportation Integrated Search

    1986-06-01

    This study was undertaken to provide the Louisiana DOTD with a data base from which decision-making information can be concerning the modification or stabilization of soils using flyash as a full or partial replacement for hydraulic cement or hydrate...

  1. Planning and Designing School Computer Facilities. Interim Report.

    ERIC Educational Resources Information Center

    Alberta Dept. of Education, Edmonton. Finance and Administration Div.

    This publication provides suggestions and considerations that may be useful for school jurisdictions developing facilities for computers in schools. An interim report for both use and review, it is intended to assist school system planners in clarifying the specifications needed by the architects, other design consultants, and purchasers involved.…

  2. Interim Policy Options for Commercialization of Solar Heating and Cooling Systems.

    ERIC Educational Resources Information Center

    Bezdek, Roger

    This interim report reviews the major incentive policy options available to accelerate market penetration of solar heating and cooling (SHAC) systems. Feasible policy options designed to overcome existing barriers to commercial acceptance and market penetration are identified and evaluated. The report is divided into seven sections, each dealing…

  3. A web-based endpoint adjudication system for interim analyses in clinical trials.

    PubMed

    Nolen, Tracy L; Dimmick, Bill F; Ostrosky-Zeichner, Luis; Kendrick, Amy S; Sable, Carole; Ngai, Angela; Wallace, Dennis

    2009-02-01

    A data monitoring committee (DMC) is often employed to assess trial progress and review safety data and efficacy endpoints throughout a trail. Interim analyses performed for the DMC should use data that are as complete and verified as possible. Such analyses are complicated when data verification involves subjective study endpoints or requires clinical expertise to determine each subject's status with respect to the study endpoint. Therefore, procedures are needed to obtain adjudicated data for interim analyses in an efficient manner. In the past, methods for handling such data included using locally reported results as surrogate endpoints, adjusting analysis methods for unadjudicated data, or simply performing the adjudication as rapidly as possible. These methods all have inadequacies that make their sole usage suboptimal. For a study of prophylaxis for invasive candidiasis, adjudication of both study eligibility criteria and clinical endpoints prior to two interim analyses was required. Because the study was expected to enroll at a moderate rate and the sponsor required adjudicated endpoints to be used for interim analyses, an efficient process for adjudication was required. We created a web-based endpoint adjudication system (WebEAS) that allows for expedited review by the endpoint adjudication committee (EAC). This system automatically identifies when a subject's data are complete, creates a subject profile from the study data, and assigns EAC reviewers. The reviewers use the WebEAS to review the subject profile and submit their completed review form. The WebEAS then compares the reviews, assigns an additional review as a tiebreaker if needed, and stores the adjudicated data. The study for which this system was originally built was administratively closed after 10 months with only 38 subjects enrolled. The adjudication process was finalized and the WebEAS system activated prior to study closure. Some website accessibility issues presented initially. However, once these issues were resolved, the reviewers found the system user-friendly and easy to navigate. Web-based data adjudication depends upon expeditious data collection and verification. Further, ability to use web-based technologies, in addition to clinical expertise, must be considered in selecting EAC members. The automated nature of this system makes it a practical mechanism for ensuring timely endpoint adjudication. The authors believe a similar approach could be useful for handling endpoint adjudication for future clinical trials.

  4. The role of the Data and Safety Monitoring Board in a clinical trial: the CRISIS study.

    PubMed

    Holubkov, Richard; Casper, T Charles; Dean, J Michael; Anand, K J S; Zimmerman, Jerry; Meert, Kathleen L; Newth, Christopher J L; Berger, John; Harrison, Rick; Willson, Douglas F; Nicholson, Carol

    2013-05-01

    Randomized clinical trials are commonly overseen by a Data and Safety Monitoring Board comprised of experts in medicine, ethics, and biostatistics. Data and Safety Monitoring Board responsibilities include protocol approval, interim review of study enrollment, protocol compliance, safety, and efficacy data. Data and Safety Monitoring Board decisions can affect study design and conduct, as well as reported findings. Researchers must incorporate Data and Safety Monitoring Board oversight into the design, monitoring, and reporting of randomized trials. Case study, narrative review. The Data and Safety Monitoring Board's role during the comparative pediatric Critical Illness Stress-Induced Immune Suppression (CRISIS) Prevention Trial is described. The National Institutes of Health-appointed CRISIS Data and Safety Monitoring Board was charged with monitoring sample size adequacy and feasibility, safety with respect to adverse events and 28-day mortality, and efficacy with respect to the primary nosocomial infection/sepsis outcome. The Federal Drug Administration also requested Data and Safety Monitoring Board interim review before opening CRISIS to children below 1 yr of age. The first interim analysis found higher 28-day mortality in one treatment arm. The Data and Safety Monitoring Board maintained trial closure to younger children and requested a second interim data review 6 months later. At this second meeting, mortality was no longer of concern, whereas a weak efficacy trend of lower infection/sepsis rates in one study arm emerged. As over 40% of total patients had been enrolled, the Data and Safety Monitoring Board elected to examine conditional power and unmask treatment arm identities. On finding somewhat greater efficacy in the placebo arm, the Data and Safety Monitoring Board recommended stopping CRISIS due to futility. The design and operating procedures of a multicenter randomized trial must consider a pivotal Data and Safety Monitoring Board role. Maximum study design flexibility must be allowed, and investigators must be prepared for protocol modifications due to interim findings. The Data and Safety Monitoring Board must have sufficient clinical and statistical expertise to assess potential importance of interim treatment differences in the setting of multiple looks at accumulating data with numerous outcomes and subgroups.

  5. 76 FR 79679 - Information Collection Being Reviewed by the Federal Communications Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ... with a number of collections in this control number, including line count filings for competitive ETCs...'' exception to the interim cap for competitive ETCs. The interim cap limited the total annual amount of high-cost support competitive ETCs in any state could receive to the amount competitive ETCs in that state...

  6. System architecture for the Canadian interim mobile satellite system

    NASA Technical Reports Server (NTRS)

    Shariatmadar, M.; Gordon, K.; Skerry, B.; Eldamhougy, H.; Bossler, D.

    1988-01-01

    The system architecture for the Canadian Interim Mobile Satellite Service (IMSS) which is planned for commencement of commercial service in late 1989 is reviewed. The results of an associated field trial program which was carried out to determine the limits of coverage and the preliminary performance characteristics of the system are discussed.

  7. 40 CFR 265.112 - Closure plan; amendment of plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND.... By May 19, 1981, or by six months after the effective date of the rule that first subjects a facility... description of other activities necessary during the partial and final closure periods to ensure that all...

  8. 78 FR 51138 - Partial Cancellation of Fremont Grain Inspection Department Inc. Designation; Selection of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-20

    ... to provide official inspection service through June 30, 2016, under the United States Grain Standards Act (USGSA), as amended. Fremont informed the Grain Inspection, Packers and Stockyards Administration... Service Company as the interim provider effective August 1, 2013 until a permanent designee is selected...

  9. 78 FR 78838 - Grant of Interim Extension of the Term of U.S. Patent No. 5,496,801; Recombinant Human...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-27

    ... Hormone AGENCY: United States Patent and Trademark Office, Commerce. ACTION: Notice of interim patent term... No. 5,496,801. The patent claims the human biological product recombinant human parathyroid hormone... human parathyroid hormone, was filed on October 24, 2013, and is currently undergoing regulatory review...

  10. 78 FR 12243 - Interim Final Determination To Stay and Defer Sanctions, Placer County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ...EPA is making an interim final determination to stay the imposition of offset sanctions and to defer the imposition of highway sanctions based on a proposed approval of a revision to the Placer County Air Pollution Control District (PCAPCD) and Feather River Air Quality Management District (FRAQMD) portion of the California State Implementation Plan (SIP) published elsewhere in this Federal Register. The SIP revision concerns two permitting rules submitted by the PCAPCD and FRAQMD, respectively: Rule 502, New Source Review, and Rule 10.1, New Source Review.

  11. Atmospheric Effects of Subsonic Aircraft: Interim Assessment Report of the Advanced Subsonic Technology Program

    NASA Technical Reports Server (NTRS)

    Friedl, Randall R. (Editor)

    1997-01-01

    This first interim assessment of the subsonic assessment (SASS) project attempts to summarize concisely the status of our knowledge concerning the impacts of present and future subsonic aircraft fleets. It also highlights the major areas of scientific uncertainty, through review of existing data bases and model-based sensitivity studies. In view of the need for substantial improvements in both model formulations and experimental databases, this interim assessment cannot provide confident numerical predictions of aviation impacts. However, a number of quantitative estimates are presented, which provide some guidance to policy makers.

  12. United States Air Force History. A Guide to Documentary Sources

    DTIC Science & Technology

    1973-01-01

    artificial limbs, crea- tive activity, and delegates to an interallied congress. The areas represented by aerial photographs are only partially identified...Interim Government of Korea, 154 477, 604 See also Korea, Korean War Hoover, J. Edgar, 604 Seas oeKra aHopkins, HEarr 8, 6 84, 3International Aeroplane Co

  13. Negative pressure wound therapy for partial-thickness burns.

    PubMed

    Dumville, Jo C; Munson, Christopher

    2012-12-12

    A burn wound is a complex and evolving injury, with both local and systemic consequences. Burn treatments include a variety of dressings, as well as newer strategies, such as negative pressure wound therapy (NPWT), which, by means of a suction force that drains excess fluids from the burn, tries to promote the wound healing process and minimise progression of the burn wound. To assess the effectiveness of NPWT for people with partial-thickness burns. For this third update we searched the Cochrane Wounds Group Specialised Register (searched 18 May 2012); The Cochrane Central Register of Controlled Trials (CENTRAL) (The Cochrane Library 2012, Issue 5); Ovid MEDLINE (2010 to May Week 2 2012); Ovid MEDLINE (In-Process & Other Non-Indexed Citations 17 May 2012); Ovid EMBASE (2010 to 2012 Week 19); and EBSCO CINAHL (2010 to 16 May 2012). All randomised controlled trials (RCTs) and controlled clinical trials (CCTs) that evaluated the safety and effectiveness of NPWT for partial-thickness burns. Two review authors used standardised forms, and extracted the data independently. We assessed each trial for risk of bias, and resolved differences by discussion. One RCT, that was an interim report, satisfied the inclusion criteria. We undertook a narrative synthesis of results, as the absence of data and poor reporting precluded us from carrying out any formal statistical analysis. The trial was at high risk of bias. There was not enough evidence available to permit any conclusions to be drawn regarding the use of NPWT for treatment of partial-thickness burn wounds.

  14. A Study of the Transitional Adjustment of a Professional Group to its Altered Role. Interim Report.

    ERIC Educational Resources Information Center

    Daniels, Morris J.

    This interim report discusses the adjustments auditing firms are making as a result of the advent of the computer. Data were obtained from (1) a review of the literature, (2) attendance at professional association meetings, and (3) a series of interviews with accountants. The findings to date indicate that the normative patterns governing the…

  15. Procedures for the handling of retaliation complaints under section 1558 of the Affordable Care Act. Interim final rule; request for comments.

    PubMed

    2013-02-27

    This document provides the interim final regulations governing the employee protection (whistleblower) provision of section 1558 of the Affordable Care Act, which added section 18C of the Fair Labor Standards Act, to provide protections to employees of health insurance issuers or other employers who may have been subject to retaliation for reporting potential violations of the law's consumer protections (e.g., the prohibition on denials of insurance due to pre-existing conditions) or affordability assistance provisions (e.g., access to health insurance premium tax credits). This interim rule establishes procedures and time frames for the handling of retaliation complaints under section 18C, including procedures and time frames for employee complaints to the Occupational Safety and Health Administration (OSHA), investigations by OSHA, appeals of OSHA determinations to an administrative law judge (ALJ) for a hearing de novo, hearings by ALJs, review of ALJ decisions by the Administrative Review Board (ARB) (acting on behalf of the Secretary of Labor), and judicial review of the Secretary's final decision.

  16. NASA Standard for Models and Simulations: Credibility Assessment Scale

    NASA Technical Reports Server (NTRS)

    Babula, Maria; Bertch, William J.; Green, Lawrence L.; Hale, Joseph P.; Moser, Gary E.; Steele, Martin J.; Sylvester, Andre; Woods, Jody

    2008-01-01

    As one of its many responses to the 2003 Space Shuttle Columbia accident, NASA decided to develop a formal standard for models and simulations (M and S)ii. Work commenced in May 2005. An interim version was issued in late 2006. This interim version underwent considerable revision following an extensive Agency-wide review in 2007 along with some additional revisions as a result of the review by the NASA Engineering Management Board (EMB) in the first half of 2008. Issuance of the revised, permanent version,hereafter referred to as the M and S Standard or just the Standard, occurred in July 2008.

  17. 78 FR 59008 - Grant of Interim Extension of the Term of U.S. Patent No. 5,624,923; Lixivaptan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-25

    ... use the product commercially. Review of the application indicates that, except for permission to... an application under 35 U.S.C. 156(d)(5) for an interim extension of the term of U.S. Patent No. 5,624,923. The patent claims the human drug product lixivaptan. The application indicates that a New...

  18. An Evaluation of ESEA Title III Projects, Fiscal Year 1972. Interim Report.

    ERIC Educational Resources Information Center

    Wilson, Jerusa; And Others

    This report contains descriptions and progress of five projects in the District of Columbia partially or wholly funded by ESEA Title III: (1) The Columbia Road Preschool Pilot Project, a second-year experimental effort designed to serve as a model school providing an experimental setting for early childhood educational programs; (2) The Montessori…

  19. The role of interim 18F-FDG PET/CT in prediction of response to ipilimumab treatment in metastatic melanoma.

    PubMed

    Sachpekidis, Christos; Anwar, Hoda; Winkler, Julia; Kopp-Schneider, Annette; Larribere, Lionel; Haberkorn, Uwe; Hassel, Jessica C; Dimitrakopoulou-Strauss, Antonia

    2018-07-01

    The aim of the present study was to assess the value of interim 18 F-FDG PET/CT performed after the first two cycles of ipilimumab treatment in the prediction of the final clinical response to this type of immunotherapy. The study group comprised 41 patients with unresectable metastatic melanoma scheduled for ipilimumab therapy. Whole-body 18 F-FDG PET/CT was performed before the start of ipilimumab treatment (baseline PET/CT) and after the initial two cycles of ipilimumab treatment (interim PET/CT). Evaluation of patient response to treatment was based on the European Organization for Research and Treatment of Cancer (EORTC) 1999 criteria for PET as well as the recently proposed PET Response Evaluation Criteria for Immunotherapy (PERCIMT). The patients' best clinical response, assessed at a median of 21.4 months (range 6.3-41.9 months) was used as reference. According to their best clinical response, the patients were divided into two groups: those showing clinical benefit (CB) including stable disease, partial response and complete response (31 patients), and those showing no clinical benefit (no-CB including progressive disease (10 patients). According to the EORTC criteria, interim PET/CT demonstrated progressive metabolic disease (PMD) in 20 patients, stable metabolic disease (SMD) in 11 patients, partial metabolic response (PMR) in 8 patients, and complete metabolic response (CMR) in 2 patients. According to the PERCIMT, interim PET/CT demonstrated PMD in 9 patients, SMD in 24 patients, PMR in 6 patients and CMR in 2 patients. On the basis of the interim PET, the patients were divided in a similar manner to the division according to clinical response into those showing metabolic benefit (MB) including SMD, PMR and CMR, and those showing no metabolic benefit (no-MB) including PMD. According to this dichotomization, the EORTC criteria showed a sensitivity (correctly predicting CB) of 64.5%, a specificity (correctly predicting no-CB) of 90.0%, a positive predictive value (PPV) of 95.2%, a negative predictive value (NPV) of 45.0% and an accuracy of 70.7% in predicting best clinical response. The PERCIMT showed a sensitivity of 93.6%, a specificity of 70.0%, a PPV of 90.6%, a NPV of 77.8% and an accuracy of 87.8%. The McNemar test showed that the PERCIMT had a significantly higher sensitivity than EORTC criteria (p = 0.004), while there was no significant difference in specificity (p = 0.5). The agreement between the two sets of criteria was poor (McNemar test p = 0.001, and accordingly kappa = 0.46). The application of the recently proposed PERCIMT to interim 18 F-FDG PET/CT provides a more sensitive predictor of final clinical response to immunotherapy than the application of the EORTC criteria in patients with metastatic melanoma.

  20. Individual Pesticides in Registration Review

    EPA Pesticide Factsheets

    You can used the Chemical Search database to search pesticides by chemical name and find their registration review dockets, along with Work Plans, risk assessments, interim and final decisions, tolerance rules, and cancellation actions.

  1. [Response to US review rules on patent subject matter of traditional Chinese medicine compositions].

    PubMed

    Liu, Pan; Cao, Ya-di; Gong, Rui-Juan; Liu, Wei

    2018-02-01

    The United States Patent and Trademark Office(USPTO) issued Interim Guidance on Patent Subject Matter Eligibility on December 16, 2014, bringing certain effects to the review rules on patent application of Chinese medicine compositions. Based on the Interim Guidance, cases analysis was used in this paper to analyze the patent subject matter issues of traditional Chinese medicine compositions in the United States. The researches have shown that the application documents should be properly written in the United States when the patent for Chinese medicine compositions is applied, which can improve the probability of authorization. Copyright© by the Chinese Pharmaceutical Association.

  2. SWSA 6 interim corrective measures environmental monitoring: FY 1991 results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clapp, R.B.; Marshall, D.S.

    1992-06-01

    In 1988, interim corrective measures (ICMs) were implemented at Solid Waste Storage Area (SWSA) 6 at Oak Ridge National Laboratory. The SWSA 6 site was regulated under the Resource Conservation and Recovery Act (RCRA). The ICMs consist of eight large high-density polyethylene sheets placed as temporary caps to cover trenches known to contain RCRA-regulated materials. Environmental monitoring for FY 1991 consisted of collecting water levels at 13 groundwater wells outside the capped areas and 44 wells in or near the capped areas in order to identify any significant loss of hydrologic isolation of the wastes. Past annual reports show thatmore » the caps are only partially effective in keeping the waste trenches dry and that many trenches consistently or intermittently contain water.« less

  3. SWSA 6 interim corrective measures environmental monitoring: FY 1991 results. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clapp, R.B.; Marshall, D.S.

    1992-06-01

    In 1988, interim corrective measures (ICMs) were implemented at Solid Waste Storage Area (SWSA) 6 at Oak Ridge National Laboratory. The SWSA 6 site was regulated under the Resource Conservation and Recovery Act (RCRA). The ICMs consist of eight large high-density polyethylene sheets placed as temporary caps to cover trenches known to contain RCRA-regulated materials. Environmental monitoring for FY 1991 consisted of collecting water levels at 13 groundwater wells outside the capped areas and 44 wells in or near the capped areas in order to identify any significant loss of hydrologic isolation of the wastes. Past annual reports show thatmore » the caps are only partially effective in keeping the waste trenches dry and that many trenches consistently or intermittently contain water.« less

  4. 75 FR 55634 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-13

    ...: 1505-0209. Type of Review: Revision of a currently approved collection. Title: Troubled Asset Relief Program--Conflicts of Interest. Abstract: The interim rule sets forth the process for reviewing and addressing actual or potential conflicts of interest among any individuals or entities seeking or having a...

  5. The variable polarity plasma arc welding process: Its application to the Space Shuttle external tank

    NASA Technical Reports Server (NTRS)

    Nunes, A. C., Jr.; Bayless, O. E., Jr.; Jones, C. S., III; Munafo, A. P.; Wilson, W. A.

    1983-01-01

    The technical history of the variable polarity plasma arc (VPPA) welding process being introduced as a partial replacement for the gas shielded tungsten arc process in assembly welding of the space shuttle external tank is described. Interim results of the weld strength qualification studies, and plans for further work on the implementation of the VPPA process are included.

  6. 76 FR 17160 - Office of New Reactors; Final Interim Staff Guidance on the Review of Nuclear Power Plant Designs...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-28

    ...The NRC staff is issuing its Final Interim Staff Guidance (ISG) DC/COL-ISG-021 titled ``Interim Staff Guidance on the Review of Nuclear Power Plant Designs Using a Gas Turbine Driven Standby Emergency Alternating Current Power System,'' Agencywide Documents Access and Management System (ADAMS) Accession No. ML102510119 for DC/ COL-ISG-021 and ADAMS Accession No. ML102510164 for Attachment 1 to DC/ COL-ISG-021. This ISG provides new guidance for applicants submitting a combined license (COL) or design certification (DC) application for new nuclear power reactors under Title 10 of the Code of Federal Regulations, part 52. In addition, it supplements the guidance provided to the NRC staff in NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants,'' March 2007, Standard Review Plan (SRP), Section 8.3.1 and Sections 9.5.4 through 9.5.8. The NRC staff issues DC/COL-ISGs to facilitate activities associated with NRC review of applications for DCs and COLs. The NRC staff intends to incorporate DC/COL-ISG-021 into the next revision of SRP Section 8.3.1 and Sections 9.5.4 through 9.5.8 and Regulatory Guide 1.206, ``Combined License Applications for Nuclear Power Plants (LWR Edition),'' June 2007. Disposition: On February 3, 2010, the NRC staff issued proposed DC/ COL-ISG-021 on ``Review of Nuclear Power Plant Designs Using a Gas Turbine Driven Standby Emergency Alternating Current Power System,'' ADAMS Accession No. ML092640035. The NRC staff received comments on the proposed guidance. This final issuance resolves the majority of the comments. The NRC staff responses to these comments can be found in ADAMS Accession No. ML102510176.

  7. Partial defect verification of spent fuel assemblies by PDET: Principle and field testing in Interim Spent fuel Storage Facility (CLAB) in Sweden

    DOE PAGES

    Ham, Y.; Kerr, P.; Sitaraman, S.; ...

    2016-05-05

    Here, the need for the development of a credible method and instrument for partial defect verification of spent fuel has been emphasized over a few decades in the safeguards communities as the diverted spent fuel pins can be the source of nuclear terrorism or devices. The need is increasingly more important and even urgent as many countries have started to transfer spent fuel to so called "difficult-to-access" areas such as dry storage casks, reprocessing or geological repositories. Partial defect verification is required by IAEA before spent fuel is placed into "difficult-to-access" areas. Earlier, Lawrence Livermore National Laboratory (LLNL) has reportedmore » the successful development of a new, credible partial defect verification method for pressurized water reactor (PWR) spent fuel assemblies without use of operator data, and further reported the validation experiments using commercial spent fuel assemblies with some missing fuel pins. The method was found to be robust as the method is relatively invariant to the characteristic variations of spent fuel assemblies such as initial fuel enrichment, cooling time, and burn-up. Since then, the PDET system has been designed and prototyped for 17×17 PWR spent fuel assemblies, complete with data acquisition software and acquisition electronics. In this paper, a summary description of the PDET development followed by results of the first successful field testing using the integrated PDET system and actual spent fuel assemblies performed in a commercial spent fuel storage site, known as Central Interim Spent fuel Storage Facility (CLAB) in Sweden will be presented. In addition to partial defect detection initial studies have determined that the tool can be used to verify the operator declared average burnup of the assembly as well as intra-assembly bunrup levels.« less

  8. Partial Defect Verification of Spent Fuel Assemblies by PDET: Principle and Field Testing in Interim Spent Fuel Storage Facility (CLAB) in Sweden

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ham, Y.S.; Kerr, P.; Sitaraman, S.

    The need for the development of a credible method and instrument for partial defect verification of spent fuel has been emphasized over a few decades in the safeguards communities as the diverted spent fuel pins can be the source of nuclear terrorism or devices. The need is increasingly more important and even urgent as many countries have started to transfer spent fuel to so called 'difficult-to-access' areas such as dry storage casks, reprocessing or geological repositories. Partial defect verification is required by IAEA before spent fuel is placed into 'difficult-to-access' areas. Earlier, Lawrence Livermore National Laboratory (LLNL) has reported themore » successful development of a new, credible partial defect verification method for pressurized water reactor (PWR) spent fuel assemblies without use of operator data, and further reported the validation experiments using commercial spent fuel assemblies with some missing fuel pins. The method was found to be robust as the method is relatively invariant to the characteristic variations of spent fuel assemblies such as initial fuel enrichment, cooling time, and burn-up. Since then, the PDET system has been designed and prototyped for 17x17 PWR spent fuel assemblies, complete with data acquisition software and acquisition electronics. In this paper, a summary description of the PDET development followed by results of the first successful field testing using the integrated PDET system and actual spent fuel assemblies performed in a commercial spent fuel storage site, known as Central Interim Spent fuel Storage Facility (CLAB) in Sweden will be presented. In addition to partial defect detection initial studies have determined that the tool can be used to verify the operator declared average burnup of the assembly as well as intra-assembly burnup levels. (authors)« less

  9. Partial defect verification of spent fuel assemblies by PDET: Principle and field testing in Interim Spent fuel Storage Facility (CLAB) in Sweden

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ham, Y.; Kerr, P.; Sitaraman, S.

    Here, the need for the development of a credible method and instrument for partial defect verification of spent fuel has been emphasized over a few decades in the safeguards communities as the diverted spent fuel pins can be the source of nuclear terrorism or devices. The need is increasingly more important and even urgent as many countries have started to transfer spent fuel to so called "difficult-to-access" areas such as dry storage casks, reprocessing or geological repositories. Partial defect verification is required by IAEA before spent fuel is placed into "difficult-to-access" areas. Earlier, Lawrence Livermore National Laboratory (LLNL) has reportedmore » the successful development of a new, credible partial defect verification method for pressurized water reactor (PWR) spent fuel assemblies without use of operator data, and further reported the validation experiments using commercial spent fuel assemblies with some missing fuel pins. The method was found to be robust as the method is relatively invariant to the characteristic variations of spent fuel assemblies such as initial fuel enrichment, cooling time, and burn-up. Since then, the PDET system has been designed and prototyped for 17×17 PWR spent fuel assemblies, complete with data acquisition software and acquisition electronics. In this paper, a summary description of the PDET development followed by results of the first successful field testing using the integrated PDET system and actual spent fuel assemblies performed in a commercial spent fuel storage site, known as Central Interim Spent fuel Storage Facility (CLAB) in Sweden will be presented. In addition to partial defect detection initial studies have determined that the tool can be used to verify the operator declared average burnup of the assembly as well as intra-assembly bunrup levels.« less

  10. 75 FR 82429 - Determinations Concerning Need for Error Correction, Partial Approval and Partial Disapproval...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-30

    ...EPA is correcting its previous full approval of Texas's Clean Air Act (CAA) Prevention of Significant Deterioration (PSD) program to be a partial approval and partial disapproval. The state did not address, or provide adequate legal authority for, the program's application to all pollutants that would become newly subject to regulation in the future, including non-National Ambient Air Quality Standard (NAAQS) pollutants, among them greenhouse gases (GHGs). Further, EPA is promulgating a federal implementation plan (FIP), as required following the partial disapproval, to establish a PSD permitting program in Texas for GHG-emitting sources. EPA is taking this action through interim final rulemaking, effective upon publication, to ensure the availability of a permitting authority-- EPA--in Texas for GHG-emitting sources when they become subject to PSD on January 2, 2011. This will allow those sources to proceed with plans to construct or expand. This rule will expire on April 30, 2011. EPA is also proposing a notice-and-comment rulemaking that mirrors this rulemaking.

  11. Implementation of high performance concrete in Louisiana bridges : interim report.

    DOT National Transportation Integrated Search

    1998-02-01

    The report contains a research plan to assist in the implementation of high performance concrete in the Charenton Canal Bridge in Louisiana. The research involves a literature review, plan review, development of a quality control program for the conc...

  12. Considerations for Domestic Law Enforcement Implementation of a UAS Program in the Proposed FAA Regulatory Environment of Integration into the National Airspace System

    DTIC Science & Technology

    2015-12-01

    institutional review board (IRB)-approved sequence was established for Delphi panel participants. The collection of data from the Delphi panel...The following year, the Office of the Inspector General Audit Division within the U.S. Department of Justice (DOJ) released an interim report on the...iacp_uaguidelines.pdf 11 Department of Justice, Office of the Inspector General, Audit Division, Interim Report on the Department of Justice’s Use and Support of

  13. 78 FR 24669 - Reorganization of Regulations on the Adjudication of Department of Homeland Security Practitioner...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-26

    ... DEPARTMENT OF JUSTICE Executive Office for Immigration Review 8 CFR Parts 1003 and 1292 [EOIR... Immigration Review, Department of Justice. ACTION: Final rule. SUMMARY: This final rule adopts without change... interim rule amended regulations of the Executive Office for Immigration Review (EOIR) at the Department...

  14. Listing of Issues in American Elementary and Secondary Education, 1979. Interim Report.

    ERIC Educational Resources Information Center

    McBain, Susan; And Others

    This document lists issues in elementary and secondary education which were identified by a review of education journals and newspapers, including: Congressional Quarterly, Education Daily, Education U.S.A., Harvard Educational Review, National Journal, Newsweek, New York Times, Phi Delta Kappan, School Review, Time, Wall Street Journal, and…

  15. Nutrient Control Design Manual–State of the Technology Review Report

    EPA Science Inventory

    This EPA document is an interim product in the development of revised design guidance for nitrogen and phosphorus control at municipal WWTPs. This document presents findings from an extensive review of nitrogen and phosphorus control technologies and techniques currently applied...

  16. 40 CFR 142.22 - Review of State variances, exemptions and schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS IMPLEMENTATION Review of...) Not later than 18 months after the effective date of the interim national primary drinking water... (and schedules prescribed pursuant thereto) by the States with primary enforcement responsibility...

  17. 40 CFR 25.12 - Assuring compliance with public participation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements. (a) Financial assistance programs—(1) Applications. EPA shall review the public participation... output requirements and milestone schedules for output achievement; interim EPA review of public... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Assuring compliance with public...

  18. Use of materials derived from cattle in human food and cosmetics; reopening of the comment period. Interim final rule; reopening of the comment period.

    PubMed

    2013-03-04

    The Food and Drug Administration (FDA or ``we'') is reopening the comment period for the interim final rule entitled "Use of Materials Derived From Cattle in Human Food and Cosmetics'' that published in the Federal Register of July 14, 2004 (69 FR 42256). The interim final rule prohibited the use of certain cattle material to address the potential risk of bovine spongiform encephalopathy (BSE) in human food, including dietary supplements, and cosmetics. In the Federal Register of September 7, 2005 (70 FR 53063), we amended the interim final rule to make changes, including providing that the small intestine of cattle, formerly prohibited cattle material, could be used in human food and cosmetics if the distal ileum was removed by a specified procedure or one that the establishment could demonstrate is equally effective in ensuring complete removal of the distal ileum. Since 2005, peer-reviewed studies have been published showing the presence of infectivity in the proximal ileum, jejunum, ileocecal junction, and colon of cattle with BSE. Therefore, we are reopening the comment period for the interim final rule to give interested parties an opportunity to comment on the new studies concerning infectivity in parts of the small intestine other than the distal ileum.

  19. 40 CFR 142.22 - Review of State variances, exemptions and schedules.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS IMPLEMENTATION Review of...) Not later than 18 months after the effective date of the interim national primary drinking water... scientific matters bearing on such variances and exemptions), and (2) advise of the opportunity to submit...

  20. 76 FR 37207 - Group Health Plans and Health Insurance Issuers: Rules Relating to Internal Claims and Appeals...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-24

    ...This document contains amendments to interim final regulations implementing the requirements regarding internal claims and appeals and external review processes for group health plans and health insurance coverage in the group and individual markets under provisions of the Affordable Care Act. These rules are intended to respond to feedback from a wide range of stakeholders on the interim final regulations and to assist plans and issuers in coming into full compliance with the law through an orderly and expeditious implementation process.

  1. Indiana application for interim authorization, phase I, hazardous waste management program--Environmental Protection Agency. Notice of public hearing and public comment period.

    PubMed

    1982-04-12

    EPA regulations to protect human health and the environment from the improper management of hazardous waste were published in the Federal Register on May 19, 1980 (45 FR 33063). These regulations include provisions for authorization of State programs to operate in lieu of the Federal program. Today EPA is announcing the availability for public review of the Indiana application for Phase I Interim Authorization, inviting public comment, and giving notice of a public hearing to be held on the application.

  2. 78 FR 13478 - Compassionate Release; Technical Changes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-28

    ... (Bureau) makes a minor change to remove an administrative level of review from the processing of a... interim rule, the Bureau of Prisons (Bureau) makes a minor change to remove an administrative level of review from the processing of a Compassionate Release request packet. DATES: This rule is effective April...

  3. 77 FR 4296 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-27

    ... Activities; Submission to OMB for Review and Approval; Comment Request; Facility Ground-Water Monitoring... docket, go to www.regulations.gov . Title: Facility Ground-Water Monitoring Requirements (Renewal). ICR.... Abstract: This ICR examines the ground-water monitoring standards for permitted and interim status...

  4. Capabilities Roadmap Briefings to the National Research Council

    NASA Technical Reports Server (NTRS)

    2005-01-01

    High energy power and propulsion capability roadmap - general background and introduction. Advanced telescopes and observatories and scientific instruments and sensors capability roadmaps - general background and introduction. Space communications capability roadmap interim review. Robotic access to planetary surface capability roadmap. Human health and support systems capability roadmap progress review.

  5. Interim Guidance on Cost Review of Grants/Performance Partnership Grants Awarded under 40 CFR Part 35 Subpart A

    EPA Pesticide Factsheets

    This cost-review approach applies to all program and PPG awards made under 40 CFR Part 35, Subpart A, where the recipient has an established, on-going grant relationship with EPA and has adequate internal controls in its personnel.

  6. Evaluation of pavement edge inset and low level illumination lights in fog : interim report no. 1.

    DOT National Transportation Integrated Search

    1973-01-01

    The Virginia Highway Research Council was asked to search for ways of making travel safer on fogbound highways. All literature obtainable on fog research was reviewed and after an in-depth review of fog abatement techniques it became apparent that ne...

  7. 76 FR 23489 - Prevention of Significant Deterioration (PSD) and Nonattainment New Source Review (NSR...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-27

    ...): Reconsideration of Inclusion of Fugitive Emissions; Interim Rule; Stay and Revisions AGENCY: Environmental... (PSD) and Nonattainment New Source Review (NSR): Reconsideration of Inclusion of Fugitive Emissions... inclusion in the public docket. Information so marked will not be disclosed except in accordance with...

  8. Field monitoring of the I-295 bridge over the James River : instrumentation installation and construction period studies : interim report.

    DOT National Transportation Integrated Search

    1988-01-01

    This report reviews the various techniques considered for instrumenting the Rte. 1-295 cable-stayed bridge over the James River near Richmond, Virginia. From this review an instrumentation plan is developed to meet the following objectives: 1. to det...

  9. Statistical aspects of the TNK-S2B trial of tenecteplase versus alteplase in acute ischemic stroke: an efficient, dose-adaptive, seamless phase II/III design.

    PubMed

    Levin, Bruce; Thompson, John L P; Chakraborty, Bibhas; Levy, Gilberto; MacArthur, Robert; Haley, E Clarke

    2011-08-01

    TNK-S2B, an innovative, randomized, seamless phase II/III trial of tenecteplase versus rt-PA for acute ischemic stroke, terminated for slow enrollment before regulatory approval of use of phase II patients in phase III. (1) To review the trial design and comprehensive type I error rate simulations and (2) to discuss issues raised during regulatory review, to facilitate future approval of similar designs. In phase II, an early (24-h) outcome and adaptive sequential procedure selected one of three tenecteplase doses for phase III comparison with rt-PA. Decision rules comparing this dose to rt-PA would cause stopping for futility at phase II end, or continuation to phase III. Phase III incorporated two co-primary hypotheses, allowing for a treatment effect at either end of the trichotomized Rankin scale. Assuming no early termination, four interim analyses and one final analysis of 1908 patients provided an experiment-wise type I error rate of <0.05. Over 1,000 distribution scenarios, each involving 40,000 replications, the maximum type I error in phase III was 0.038. Inflation from the dose selection was more than offset by the one-half continuity correction in the test statistics. Inflation from repeated interim analyses was more than offset by the reduction from the clinical stopping rules for futility at the first interim analysis. Design complexity and evolving regulatory requirements lengthened the review process. (1) The design was innovative and efficient. Per protocol, type I error was well controlled for the co-primary phase III hypothesis tests, and experiment-wise. (2a) Time must be allowed for communications with regulatory reviewers from first design stages. (2b) Adequate type I error control must be demonstrated. (2c) Greater clarity is needed on (i) whether this includes demonstration of type I error control if the protocol is violated and (ii) whether simulations of type I error control are acceptable. (2d) Regulatory agency concerns that protocols for futility stopping may not be followed may be allayed by submitting interim analysis results to them as these analyses occur.

  10. Alaska Interim Land Cover Mapping Program; final report

    USGS Publications Warehouse

    Fitzpatrick-Lins, Katherine; Doughty, E.F.; Shasby, Mark; Benjamin, Susan

    1989-01-01

    In 1985, the U.S. Geological Survey initiated a research project to develop an interim land cover data base for Alaska as an alternative to the nationwide Land Use and Land Cover Mapping Program. The Alaska Interim Land Cover Mapping Program was subsequently created to develop methods for producing a series of land cover maps that utilized the existing Landsat digital land cover classifications produced by and for the major land management agencies for mapping the vegetation of Alaska. The program was successful in producing digital land cover classifications and statistical summaries using a common statewide classification and in reformatting these data to produce l:250,000-scale quadrangle-based maps directly from the Scitex laser plotter. A Federal and State agency review of these products found considerable user support for the maps. Presently the Geological Survey is committed to digital processing of six to eight quadrangles each year.

  11. Interim rules for amending ERISA disclosure requirements for group health plans; approval of information collection requirements--DoL. Interim rules; approval of information collection requirements.

    PubMed

    1997-07-07

    On April 8, 1997, the Department of Labor published interim final rules governing disclosure requirements for private sector group health plans (62 FR 16979). The rules implemented changes to made to certain provisions of the Employee Retirement Income Security Act of 1974 (ERISA), enacted as part of the Health Insurance Portability and Accountability Act of 1996 (HIPAA) and the Newborns' and Mothers' Health Protection Act of 1996 (NMHPA). In the April 8 publication, the Department submitted its revision of the currently approved collection regarding Summary Plan Description requirements under ERISA to the Office of Management and Budget (OMB) for emergency review under the Paperwork Reduction Act of 1965 (PRA 95). This document amends the April 8 Federal Register document to properly display the OMB control number, 1210-0039.

  12. 78 FR 30965 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ... for Carbon Dioxide Sequestration Under Section 45Q. Abstract: This notice sets forth interim guidance, pending the issuance of regulations, relating to the credit for carbon dioxide sequestration (CO 2...

  13. Transformational Spaceport and Range Capabilities Roadmap Interim Review to National Research Council External Review Panel

    NASA Technical Reports Server (NTRS)

    Poniatowski, Karen

    2005-01-01

    Contents include the following: Overview/Introduction. Roadmap Approach/Considerations. Roadmap Timeline/Spirals. Requirements Development. Spaceport/Range Capabilities. Mixed Range Architecture. User Requirements/Customer Considerations. Manifest Considerations. Emerging Launch User Requirements. Capability Breakdown Structure/Assessment. Roadmap Team Observations. Transformational Range Test Concept. Roadmap Team Conclusions. Next Steps.

  14. State-of-the-Art Review Prediction and Control of Groundborne Noise and Vibration from Rail Transit Trains : Annotated Bibliography

    DOT National Transportation Integrated Search

    1982-02-01

    This interim report presents an annotated bibliography that has been compiled as part of a comprehensive review of the state-of-the-art in the prediction and control of groundborne noise and vibration created by rail transit operations. Included in t...

  15. Establishing a Quality Control System for Stem Cell-Based Medicinal Products in China

    PubMed Central

    2015-01-01

    Stem cell-based medicinal products (SCMPs) are emerging as novel therapeutic products. The success of its development depends on the existence of an effective quality control system, which is constituted by quality control technologies, standards, reference materials, guidelines, and the associated management system in accordance with regulatory requirements along product lifespan. However, a worldwide, effective quality control system specific for SCMPs is still far from established partially due to the limited understanding of stem cell sciences and lack of quality control technologies for accurately assessing the safety and biological effectiveness of SCMPs before clinical use. Even though, based on the existing regulations and current stem cell sciences and technologies, initial actions toward the goal of establishing such a system have been taken as exemplified by recent development of new “interim guidelines” for governing quality control along development of SCMPs and new development of the associated quality control technologies in China. In this review, we first briefly introduced the major institutions involved in the regulation of cell substrates and therapeutic cell products in China and the existing regulatory documents and technical guidelines used as critical references for developing the new interim guidelines. With focus only on nonhematopoietic stem cells, we then discussed the principal quality attributes of SCMPs as well as our thinking of proper testing approaches to be established with relevant evaluation technologies to ensure all quality requirements of SCMPs along different manufacturing processes and development stages. At the end, some regulatory and technical challenges were also discussed with the conclusion that combined efforts should be taken to promote stem cell regulatory sciences to establish the effective quality control system for SCMPs. PMID:25471126

  16. Frequency and Type of Prosthetic Complications Associated with Interim, Immediately Loaded Full-Arch Prostheses: A 2-Year Retrospective Chart Review.

    PubMed

    Drago, Carl

    2016-08-01

    The purpose of this report was to retrospectively evaluate implant and immediate full-arch prosthesis survival rates over a 24-month period; patients were consecutively treated with immediate occlusal loading. Dental arch, gender, and implant orientation (vertical vs. tilted) were also noted. All Brånemark System implants (Nobel Active) and interim, all-acrylic resin prostheses placed in patients following an All-on-Four™ protocol, in a single private practice were assessed by retrospective patient chart review. The amount of space provided surgically for implant restorative components and prostheses was determined from measurements of the vertical heights of the interim prostheses in the right/left anterior and posterior segments. These measurements were made in the laboratory. Interim prosthetic repairs (type, frequency, length of time from insertion) were analyzed by type, arch, gender, and implant orientation. Implant survival and insertion torque values were also measured. Inclusion criteria consisted of all Brånemark System implants placed with the All-on-Four protocol from September 1, 2011, until August 31, 2013. Specific dietary instructions were given for the first 7 days immediately postoperatively and for the weeks prior to insertion of the definitive prostheses. One hundred twenty-nine patients, comprising 191 arches (766 implants) from September 1, 2011, until August 31, 2013, were included in the study. One patient experienced implant failure yielding an overall implant survival rate (SR) of 99.5% (762 of 766). Four hundred twenty-six of 430 maxillary implants and 336 of 336 mandibular implants survived for SRs of 99.1% and 100%, respectively. Regarding implant orientation, 415 of 417 tilted implants (SR 99.5%) and 343 of 345 (CSR 95.6%) vertical implants were noted to be clinically stable. Interim, all-acrylic resin prostheses were in place for a mean of 199.2 days; mandibular prostheses were in place for an average of 195.4 days; maxillary prostheses were in place for an average of 202.0 days. Thirty four of the 191 interim prostheses (17.8%) warranted at least one repair during the treatment period. The average overall implant insertion torque value was 60.74 Ncm; mandibular torque values averaged 63.08 Ncm; maxillary torque values averaged 59.00 Ncm. The results from this study suggest that dental arch, gender, and implant orientation for implants placed and immediately restored with interim, all-acrylic resin, full-arch prostheses per the All-on-Four protocol did not have significant statistical or clinical effects on prosthetic complications of the interim prostheses or implant survival. Only one of the 129 patients experienced implant failures, indicating that the All-on-Four treatment protocol used in this study is a viable alternative to other protocols for rehabilitating edentulous patients. © 2015 by the American College of Prosthodontists.

  17. Evaluation of full depth asphaltic concrete pavements : interim report.

    DOT National Transportation Integrated Search

    1975-02-01

    This report provides a review of the performance and structural characteristics exhibited on two full depth asphaltic concrete pavement projects constructed on the Louisiana interstate system. : The roughness characteristics of both full depth projec...

  18. NRL EIGHTH CARD Program Interim Progress Report, 1 March 1969 to 30 September 1969

    DTIC Science & Technology

    1969-12-31

    methods to measure the water vapor content of the atmosphere have been inves- tigated. One is based on the psychrometer method of measuring wet and dry bulb...over and under configuration. A shipboard psychrometer consisting of the sensors and blower and an 18.5-foot-high intake stack has been mounted on a...small boat. The intake stack may be partially dismounted to pro- vide a 9-foot intake level. The readout for the psychrometer is a multipoint Leeds and

  19. Contingency Approaches to Leadership: A Review and Synthesis. Interim Report for Preiod 1 September 1974-1 June 1975.

    ERIC Educational Resources Information Center

    Hendrix, William H.

    This report focuses on the problem of how to improve leadership effectiveness in order to improve overall organization effectiveness. First, three different approaches to leadership behavior are presented: Trait Approach, Behavioral Approach, and Situational Approach. Next, reviews of the leadership literature and of eight contingency models of…

  20. Review of ride quality technology needs of industry and user groups

    NASA Technical Reports Server (NTRS)

    Mckenzie, J. R.; Brumaghim, S. H.

    1975-01-01

    A broad survey of ride quality technology state-of-the-art and a review of user evaluation of this technology were conducted. During the study 17 users of ride quality technology in 10 organizations representing land, marine and air passenger transportation modes were interviewed. Interim results and conclusions of this effort are reported.

  1. 76 FR 72725 - Draft License Renewal Interim Staff Guidance LR-ISG-2011-05: Ongoing Review of Operating Experience

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-25

    ... Experience.'' This LR-ISG provides guidance and clarification concerning ongoing review of plant-specific and... plants. As noticed on September 20, 2011 (76 FR 58311), the public comment period was extended and, as of... to communicate insights and lessons learned and to address emergent issues not covered in license...

  2. 75 FR 52581 - Notice of Meeting and Closed Meeting of the Cultural Property Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-26

    ... or October 13, must request to be scheduled and must submit a written text of the oral comments..., October 13, the Committee will review a proposal to extend the Memorandum of Understanding Between the... Thursday, October 14, the Committee will conduct interim reviews of the Memorandum of Understanding Between...

  3. INTERIM ANALYSIS OF THE CONTRIBUTION OF HIGH-LEVEL EVIDENCE FOR DENGUE VECTOR CONTROL.

    PubMed

    Horstick, Olaf; Ranzinger, Silvia Runge

    2015-01-01

    This interim analysis reviews the available systematic literature for dengue vector control on three levels: 1) single and combined vector control methods, with existing work on peridomestic space spraying and on Bacillus thuringiensis israelensis; further work is available soon on the use of Temephos, Copepods and larvivorous fish; 2) or for a specific purpose, like outbreak control, and 3) on a strategic level, as for example decentralization vs centralization, with a systematic review on vector control organization. Clear best practice guidelines for methodology of entomological studies are needed. There is a need to include measuring dengue transmission data. The following recommendations emerge: Although vector control can be effective, implementation remains an issue; Single interventions are probably not useful; Combinations of interventions have mixed results; Careful implementation of vector control measures may be most important; Outbreak interventions are often applied with questionable effectiveness.

  4. Reproducibilty of partial weight bearing.

    PubMed

    Malviya, A; Richards, J; Jones, Richard K; Udwadia, A; Doyle, J

    2005-04-01

    To find out whether partial weight bearing can be reproduced and retained. In vivo experiment in normal subjects. Training for partial weight bearing (25% of body weight) using bathroom scales. Reproducibility on force platform immediately after training and after 60 min. Twelve subjects were asked to reproduce 25% of their body weight through either the dominant or non-dominant limb on force platform after three practice attempts on bathroom scales with concurrent visual feedback. No feedback was provided after the measurements on force plate. The process was repeated after 1h without any practice sessions in the interim period to find out if the weight practised could be retained. The mean 0-min reading was found to be 25.9% of body weight while the mean 60-min reading was found to be 24.4%. The p-value for the difference between the two means was found to be 0.3841. This study indicates that partial weight bearing instructions can be quantified and graded. Simple bathroom scales are sufficient to educate the patients and this can be practised at home after an initial period of supervision.

  5. Usefulness of Interim FDG-PET After Induction Chemotherapy in Patients With Locally Advanced Squamous Cell Carcinoma of the Head and Neck Receiving Sequential Induction Chemotherapy Followed by Concurrent Chemoradiotherapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yoon, Dok Hyun; Cho, Yoojin; Kim, Sang Yoon

    2011-09-01

    Purpose: Induction chemotherapy (ICT) has been used to select patients for organ preservation and determine subsequent treatments in patients with locally advanced squamous cell carcinoma of the head and neck (LASCCHN). Still, the clinical outcomes of LASCCHN patients who showed response to ICT are heterogeneous. We evaluated the efficacy of interim 18-fluoro-2-deoxy-glucose positron emission tomography (FDG-PET) after ICT in this specific subgroup of LASCCHN patients who achieved partial response (PR) after ICT to predict clinical outcomes after concurrent chemoradiotherapy (CCRT). Methods and Materials: Twenty-one patients with LASCCHN who showed PR to ICT by Response Evaluation Criteria In Solid Tumors beforemore » definitive CCRT were chosen in this retrospective analysis. FDG-PET was performed before and 2-4 weeks after ICT to assess the extent of disease at baseline and the metabolic response to ICT, respectively. We examined the correlation of the metabolic response by the percentage decrease of maximum standardized uptake value (SUVmax) on the primary tumor or lymph node after ICT or a specific threshold of SUVmax on interim FDG-PET with clinical outcomes including complete response (CR) rate to CCRT, progression-free survival (PFS), and overall survival (OS). Results: A SUVmax of 4.8 on interim FDG-PET could predict clinical CR after CCRT (100% vs. 20%, p = 0.001), PFS (median, not reached vs. 8.5 mo, p < 0.001), and OS (median, not reached vs. 12.0 months, p = 0.001) with a median follow-up of 20.3 months in surviving patients. A 65% decrease in SUVmax after ICT from baseline also could predict clinical CR after CCRT (100% vs. 33.3%, p = 0.003), PFS (median, not reached vs. 8.9 months, p < 0.001) and OS (median, not reached vs. 24.4 months, p = 0.001) of the patients. Conclusion: These data suggest that interim FDG-PET after ICT might be a useful determinant to predict clinical outcomes in patients with LASCCHN receiving sequential ICT followed by CCRT.« less

  6. A Process Evaluation of Project Developmental Continuity. Interim Report II, Part B: Recommendations for Measuring Program Impact.

    ERIC Educational Resources Information Center

    Love, John M.; And Others

    This report presents recommendations for measures to be used in assessing the impact of Project Developmental Continuity (PDC). Chapter I reviews the purpose of the impact study and presents the basic considerations guiding the selection of measures. Chapter II describes the review process that led to the final recommendations. Chapter III…

  7. Predicting High Occupancy Vehicle Lane Demand, Final Report

    DOT National Transportation Integrated Search

    1996-08-01

    ">THIS REPORT PRESENTS THE INTERIM RESULTS OF THIS PROJECT, SPECIFICALLY: 1. A REVIEW OF THE AVAILABLE LITERATURE AND THE EXPERIENCES OF PUBLIC AGENCIES WITH CURRENT METHODS FOR PREDICTING THE DEMAND FOR HOV LANES, 2. THE PROPOSED NEW METHOD...

  8. Evaluation of experimental railroad-highway grade crossings in Louisiana.

    DOT National Transportation Integrated Search

    1983-08-01

    This interim report was prepared to provide a review of the performance of thirty railroad-highway grade crossings installed experimentally in Louisiana between 1970 and 1983. They were constructed of rubber, high-density polyethylene (HDPE) or pre-c...

  9. Rural applications of advanced traveler information systems : recommended actions

    DOT National Transportation Integrated Search

    1997-07-01

    The Recommended Action Plan is one in a series of interim documents for the Rural Applications of Advanced Traveler Information Systems (ATIS) project. Based on the investigation of user needs, a technology review, and concept development and assessm...

  10. The atmospheric effects of stratospheric aircraft: A fourth program report

    NASA Technical Reports Server (NTRS)

    Stolarski, Richard S. (Editor); Wesoky, Howard L. (Editor); Wofsy, Steven C.; Ravishankara, A. R.; Rodriguez, Jose M.; Grose, William L.

    1995-01-01

    This document presents the fourth report from the Atmospheric Effects of Stratospheric Aircraft (AESA) component of NASA's High-Speed Research Program (HSRP). Market and technology considerations continue to provide an impetus for high-speed civil transport research. A recent AESA interim assessment report and a review of that report have shown that considerable uncertainty still exists about the possible impact of aircraft on the atmosphere. The AESA has been designed to develop the body of scientific knowledge necessary for the evaluation of the impact of stratospheric aircraft on the atmosphere. The first Program report presented the basic objectives and plans for AESA. This fourth report comes after the interim assessment and sets forth directions for the 1995 assessment at the end of AESA Phase 1. It also sets forth the goals and directions for AESA Phase 2, as reported at the 1994 Atmospheric Effects of Aviation Project (AEAP) annual meeting held in June. The focus of the Phase 2 effort is to obtain the best possible closure on the outstanding problems identified in the interim assessment and NASA/NRC review. Topics discussed in this report include how high-speed civil transports (HSCT) might affect stratospheric ozone, emissions scenarios and databases to assess potential atmospheric effects from HSCT's, calculated results from 2-D zonal mean models using emissions data, engine trace constituent measurements.

  11. Diffuse Large B-Cell Lymphoma: Prospective Multicenter Comparison of Early Interim FLT PET/CT versus FDG PET/CT with IHP, EORTC, Deauville, and PERCIST Criteria for Early Therapeutic Monitoring

    PubMed Central

    Minamimoto, Ryogo; Fayad, Luis; Advani, Ranjana; Vose, Julie; Macapinlac, Homer; Meza, Jane; Hankins, Jordan; Mottaghy, Felix; Juweid, Malik

    2016-01-01

    Purpose To compare the performance characteristics of interim fluorine 18 (18F) fluorodeoxyglucose (FDG) positron emission tomography (PET)/computed tomography (CT) (after two cycles of chemotherapy) by using the most prominent standardized interpretive criteria (including International Harmonization Project [IHP] criteria, European Organization for Research and Treatment of Cancer [EORTC] criteria, and PET Response Criteria in Solid Tumors (PERCIST) versus those of interim 18F fluorothymidine (FLT) PET/CT and simple visual interpretation. Materials and Methods This HIPAA-compliant prospective study was approved by the institutional review boards, and written informed consent was obtained. Patients with newly diagnosed diffuse large B-cell lymphoma (DLBCL) underwent both FLT and FDG PET/CT 18–24 days after two cycles of rituximab, cyclophosphamide, doxorubicin, vincristine, and prednisone or rituximab, etoposide, prednisone, vincristine, cyclophosphamide, and doxorubicin. For FDG PET/CT interpretation, IHP criteria, EORTC criteria, PERCIST, Deauville criteria, standardized uptake value, total lesion glycolysis, and metabolic tumor volume were used. FLT PET/CT images were interpreted with visual assessment by two reviewers in consensus. The interim (after cycle 2) FDG and FLT PET/CT studies were then compared with the end-of-treatment FDG PET/CT studies to determine which interim examination and/or criteria best predicted the result after six cycles of chemotherapy. Results From November 2011 to May 2014, there were 60 potential patients for inclusion, of whom 46 patients (24 men [mean age, 60.9 years ± 13.7; range, 28–78 years] and 22 women [mean age, 57.2 years ± 13.4; range, 25–76 years]) fulfilled the criteria. Thirty-four patients had complete response, and 12 had residual disease at the end of treatment. FLT PET/CT had a significantly higher positive predictive value (PPV) (91%) in predicting residual disease than did any FDG PET/CT interpretation method (42%–46%). No difference in negative predictive value (NPV) was found between FLT PET/CT (94%) and FDG PET/CT (82%–95%), regardless of the interpretive criteria used. FLT PET/CT showed statistically higher (P < .001–.008) or similar NPVs than did FDG PET/CT. Conclusion Early interim FLT PET/CT had a significantly higher PPV than standardized FDG PET/CT–based interpretation for therapeutic response assessment in DLBCL. © RSNA, 2016 Online supplemental material is available for this article. PMID:26854705

  12. BACT Phase I: Interim Report of the Climate Change Workgroup of the Permits, New Source Review, and Toxic Subcommittee

    EPA Pesticide Factsheets

    This report report details the issues involved in implementing the Clean Air Act's Prevention of Significant Deterioration (PSD) program permittingrequirements for new and modified sources of greenhouse gases (GHGs).

  13. Polymer modified asphalt in hot mix pavement : interim report, executive summary.

    DOT National Transportation Integrated Search

    1988-11-01

    This report presents a summary of a literature review to determine the most appropriate testing procedures for use with polymer modified asphalts. In examining testing procedures, it was necessary to study the effects of polymer modifiers on both bin...

  14. 17 CFR 210.8-03 - Interim financial statements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... reviewed by an independent public accountant using professional standards and procedures for conducting..., extraordinary items and cumulative effects of changes in accounting principles or practices. (Financial... periods. (5) Material accounting changes. Disclosure must be provided of the date and reasons for any...

  15. 17 CFR 210.8-03 - Interim financial statements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... reviewed by an independent public accountant using professional standards and procedures for conducting..., extraordinary items and cumulative effects of changes in accounting principles or practices. (Financial... periods. (5) Material accounting changes. Disclosure must be provided of the date and reasons for any...

  16. 17 CFR 210.8-03 - Interim financial statements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... reviewed by an independent public accountant using professional standards and procedures for conducting..., extraordinary items and cumulative effects of changes in accounting principles or practices. (Financial... periods. (5) Material accounting changes. Disclosure must be provided of the date and reasons for any...

  17. Human Factors in Railroad Operations : Activities in Fiscal Year 1973

    DOT National Transportation Integrated Search

    1974-02-01

    This is an interim report covering human factors services rendered by TSC to the FRA under the project: "Human Factors in Railroad Operations," during fiscal year 1973. It reviews all activities briefly and contains more detailed reports on a researc...

  18. Adaptive design clinical trials: a review of the literature and ClinicalTrials.gov

    PubMed Central

    Bothwell, Laura E; Avorn, Jerry; Khan, Nazleen F; Kesselheim, Aaron S

    2018-01-01

    Objectives This review investigates characteristics of implemented adaptive design clinical trials and provides examples of regulatory experience with such trials. Design Review of adaptive design clinical trials in EMBASE, PubMed, Cochrane Registry of Controlled Clinical Trials, Web of Science and ClinicalTrials.gov. Phase I and seamless Phase I/II trials were excluded. Variables extracted from trials included basic study characteristics, adaptive design features, size and use of independent data monitoring committees (DMCs) and blinded interim analyses. We also examined use of the adaptive trials in new drug submissions to the Food and Drug Administration (FDA) and European Medicines Agency (EMA) and recorded regulators’ experiences with adaptive designs. Results 142 studies met inclusion criteria. There has been a recent growth in publicly reported use of adaptive designs among researchers around the world. The most frequently appearing types of adaptations were seamless Phase II/III (57%), group sequential (21%), biomarker adaptive (20%), and adaptive dose-finding designs (16%). About one-third (32%) of trials reported an independent DMC, while 6% reported blinded interim analysis. We found that 9% of adaptive trials were used for FDA product approval consideration, and 12% were used for EMA product approval consideration. International regulators had mixed experiences with adaptive trials. Many product applications with adaptive trials had extensive correspondence between drug sponsors and regulators regarding the adaptive designs, in some cases with regulators requiring revisions or alterations to research designs. Conclusions Wider use of adaptive designs will necessitate new drug application sponsors to engage with regulatory scientists during planning and conduct of the trials. Investigators need to more consistently report protections intended to preserve confidentiality and minimise potential operational bias during interim analysis. PMID:29440155

  19. Faster-than-Light Particles: A Review of Tachyon Characteristics.

    DTIC Science & Technology

    1980-10-01

    A-DlAO9(4 529 RAND CORP SANTA MNtICA CA F/6 20/S FASTER-THAN-LIBI4T PARTICLES: A REVIEW OF TACHYON CHARACTERISTIC--ETCWU) OCT B0 E A PUSCHER F49620...77-C-0023 UNCLASSIFIED RAI0IN-1530-AF N. I nmui ininmuuuI LEVEL A RAND NOTE FASTER-THAN-LIGHT PARTICLES: A REVIEW OF ) ( TACHYON CHARACTERISTICS Edward...RECIPIENT’S CATALOG NUMBER 4TIT LE ( d Subtitle) TYPE OF REPORT & PERIOD COVERED ( Faster-than-Light Particles: A Review of /Interim -i Tachyon

  20. COBRA System Engineering Processes to Achieve SLI Strategic Goals

    NASA Technical Reports Server (NTRS)

    Ballard, Richard O.

    2003-01-01

    The COBRA Prototype Main Engine Development Project was an endeavor conducted as a joint venture between Pratt & Whitney and Aerojet to conduct risk reduction in LOX/LH2 main engine technology for the NASA Space Launch Initiative (SLI). During the seventeen months of the project (April 2001 to September 2002), approximately seventy reviews were conducted, beginning with the Engine Systems Requirements Review (SRR) and ending with the Engine Systems Interim Design Review (IDR). This paper discusses some of the system engineering practices used to support the reviews and the overall engine development effort.

  1. Atmospheric forcing of sea ice anomalies in the Ross Sea polynya region

    NASA Astrophysics Data System (ADS)

    Dale, Ethan R.; McDonald, Adrian J.; Coggins, Jack H. J.; Rack, Wolfgang

    2017-01-01

    We investigate the impacts of strong wind events on the sea ice concentration within the Ross Sea polynya (RSP), which may have consequences on sea ice formation. Bootstrap sea ice concentration (SIC) measurements derived from satellite SSM/I brightness temperatures are correlated with surface winds and temperatures from Ross Ice Shelf automatic weather stations (AWSs) and weather models (ERA-Interim). Daily data in the austral winter period were used to classify characteristic weather regimes based on the percentiles of wind speed. For each regime a composite of a SIC anomaly was formed for the entire Ross Sea region and we found that persistent weak winds near the edge of the Ross Ice Shelf are generally associated with positive SIC anomalies in the Ross Sea polynya and vice versa. By analyzing sea ice motion vectors derived from the SSM/I brightness temperatures we find significant sea ice motion anomalies throughout the Ross Sea during strong wind events, which persist for several days after a strong wind event has ended. Strong, negative correlations are found between SIC and AWS wind speed within the RSP indicating that strong winds cause significant advection of sea ice in the region. We were able to partially recreate these correlations using colocated, modeled ERA-Interim wind speeds. However, large AWS and model differences are observed in the vicinity of Ross Island, where ERA-Interim underestimates wind speeds by a factor of 1.7 resulting in a significant misrepresentation of RSP processes in this area based on model data. Thus, the cross-correlation functions produced by compositing based on ERA-Interim wind speeds differed significantly from those produced with AWS wind speeds. In general the rapid decrease in SIC during a strong wind event is followed by a more gradual recovery in SIC. The SIC recovery continues over a time period greater than the average persistence of strong wind events and sea ice motion anomalies. This suggests that sea ice recovery occurs through thermodynamic rather than dynamic processes.

  2. Failsafe automation of Phase II clinical trial interim monitoring for stopping rules.

    PubMed

    Day, Roger S

    2010-02-01

    In Phase II clinical trials in cancer, preventing the treatment of patients on a study when current data demonstrate that the treatment is insufficiently active or too toxic has obvious benefits, both in protecting patients and in reducing sponsor costs. Considerable efforts have gone into experimental designs for Phase II clinical trials with flexible sample size, usually implemented by early stopping rules. The intended benefits will not ensue, however, if the design is not followed. Despite the best intentions, failures can occur for many reasons. The main goal is to develop an automated system for interim monitoring, as a backup system supplementing the protocol team, to ensure that patients are protected. A secondary goal is to stimulate timely recording of patient assessments. We developed key concepts and performance needs, then designed, implemented, and deployed a software solution embedded in the clinical trials database system. The system has been in place since October 2007. One clinical trial tripped the automated monitor, resulting in e-mails that initiated statistician/investigator review in timely fashion. Several essential contributing activities still require human intervention, institutional policy decisions, and institutional commitment of resources. We believe that implementing the concepts presented here will provide greater assurance that interim monitoring plans are followed and that patients are protected from inadequate response or excessive toxicity. This approach may also facilitate wider acceptance and quicker implementation of new interim monitoring algorithms.

  3. 75 FR 30113 - Rural Microentrepreneur Assistance Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-28

    ... government levels. Regulatory Flexibility Act This interim rule has been reviewed with regard to the... efforts to build the capacity of the microenterprise development industry to achieve new levels of... loan program level and legislative intent in the USDA FY 2010 appropriations bill. If this information...

  4. Review and evaluation of models that produce trip tables from ground counts : interim report.

    DOT National Transportation Integrated Search

    1996-01-01

    This research effort was motivated by the desires of planning agencies to seek alternative methods of deriving current or base year Origin-Destination (O-D) trip tables without adopting conventional O-D surveys that are expensive, time consuming and ...

  5. 77 FR 9617 - Defense Federal Acquisition Regulation Supplement; DoD Voucher Processing (DFARS Case 2011-D054)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-17

    ... risk-based sampling methodologies will be reviewed and approved by the contract auditors for... the disbursing office. All interim vouchers are subject to an audit of actual costs incurred after... process currently referenced [[Page 9618

  6. An Interim Update to the 2035 Socioeconomic and Travel Demand Forecasts for Virginia

    DOT National Transportation Integrated Search

    2012-10-01

    In support of the update to Virginias 2035 Statewide Multimodal Plan, this report provides an update to select : socioeconomic forecasts initially made in 2009 based on a review of data from national sources and the literature. Mobility : needs ex...

  7. An interim update to the 2035 socioeconomic and travel demand forecasts for Virginia.

    DOT National Transportation Integrated Search

    2012-09-01

    "In support of the update to Virginias 2035 Statewide Multimodal Plan, this report provides an update to select : socioeconomic forecasts initially made in 2009 based on a review of data from national sources and the literature. Mobility : needs e...

  8. An interim update to the 2035 socioeconomic and travel demand forecasts for Virginia.

    DOT National Transportation Integrated Search

    2012-10-01

    In support of the update to Virginias 2035 Statewide Multimodal Plan, this report provides an update to select : socioeconomic forecasts initially made in 2009 based on a review of data from national sources and the literature. Mobility : needs ex...

  9. Analysis of Transportation Options for Commercial Spent Fuel in the U.S.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kalinina, Elena; Busch, Ingrid Karin

    The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S.more » Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF)...« less

  10. Metal Additive Manufacturing: A Review of Mechanical Properties (Postprint)

    DTIC Science & Technology

    2016-04-21

    works reviewed herein followed these ASTM/ISO rules. In some cases , only one letter was used for nonsymmetric samples. The tables also document any...Mohsen Seifi Case Western Reserve University 19 April 2016 Interim Report Distribution Statement A. Approved for public...FA8650-12-2-7230 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 63680F 6. AUTHOR(S) John J. Lewandowski and Mohsen Seifi - Case Western Reserve

  11. NASA Standard for Models and Simulations: Credibility Assessment Scale

    NASA Technical Reports Server (NTRS)

    Babula, Maria; Bertch, William J.; Green, Lawrence L.; Hale, Joseph P.; Mosier, Gary E.; Steele, Martin J.; Woods, Jody

    2009-01-01

    As one of its many responses to the 2003 Space Shuttle Columbia accident, NASA decided to develop a formal standard for models and simulations (M&S). Work commenced in May 2005. An interim version was issued in late 2006. This interim version underwent considerable revision following an extensive Agency-wide review in 2007 along with some additional revisions as a result of the review by the NASA Engineering Management Board (EMB) in the first half of 2008. Issuance of the revised, permanent version, hereafter referred to as the M&S Standard or just the Standard, occurred in July 2008. Bertch, Zang and Steeleiv provided a summary review of the development process of this standard up through the start of the review by the EMB. A thorough recount of the entire development process, major issues, key decisions, and all review processes are available in Ref. v. This is the second of a pair of papers providing a summary of the final version of the Standard. Its focus is the Credibility Assessment Scale, a key feature of the Standard, including an example of its application to a real-world M&S problem for the James Webb Space Telescope. The companion paper summarizes the overall philosophy of the Standard and an overview of the requirements. Verbatim quotes from the Standard are integrated into the text of this paper, and are indicated by quotation marks.

  12. 75 FR 56601 - Privacy Act of 1974: New System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-16

    ...The Patient Protection and Affordable Care Act (the Affordable Care Act), Public Law 111-148, was enacted on March 23, 2010; the Health Care and Education Reconciliation Act (the Reconciliation Act), Public Law 111-152, was enacted on March 30, 2010. The Affordable Care Act and implementing regulations (codified in HHS interim final rules (IFR) at 45 CFR Part 147) require that non-grandfathered health insurance plans and issuers offering group and individual coverage have effective internal claims and appeals and external review processes. The effective date for these requirements is plan or policy years beginning on or after September 23, 2010. Regarding external review, the statute requires that health plans and issuers must comply with either a state external review process or a process meeting standards issued by the Secretary of Health and Human Services (HHS) that is ``similar to'' a state process meeting requirements in section 2719 (a ``federal external review process''). The IFR includes a transition period prior to July 1, 2011, during which time HHS will work with states to assist in making any necessary changes so that the state process will meet the minimum consumer protections identified in 45 CFR 147.136 that must be met in order for the state process to apply. During this interim period, health insurance issuers in states with external review laws in effect prior to September 23, 2010 will follow that state's external review law to the extent applicable. In states that have not passed an external review law that is in effect on September 23, 2010, a health insurance issuer must follow an interim federal external review process that will be administered by the Office of Personnel Management (OPM). The system of records will be created as OPM assists HHS by providing external reviews of adverse benefit determinations and final internal adverse benefit determinations as requested by eligible claimants and their authorized representatives (``claimants''). The system of records will include any data relevant to these external reviews, and OPM proposes to add this new system of records to its inventory of records systems subject to the Privacy Act of 1974 (5 U.S.C. 552a), as amended. This action is necessary to meet the requirements of the Privacy Act to publish in the Federal Register notice of the existence and character of records maintained by the agency (5 U.S.C. 552a(e)(4)).

  13. Approval of information collection requirements for the joint interim rules for health insurance portability for group health plans, and the individual market health insurance reform: portability from group to individual coverage; federal rules for access in the individual market; state alternative mechanisms to federal rules--IRS, DOL, HCFA. Interim rules with request for comments; approval of information collection requirements.

    PubMed

    1997-07-02

    On April 8, 1997, the Department of the Treasury, the Department of Labor, and the Department of Health and Human Services (Departments) published joint interim rules governing the access, portability and renewability requirements for group health plans and issuers offering group health insurance coverage in connection with a group health plan. The rules implemented changes made to certain provisions of the Internal Revenue Code of 1986 (Code), the Employee Retirement Income Security Act of 1974 (ERISA), and the Public Health Service Act (PHS Act) enacted as part of the Health Insurance Portability and Accountability Act of 1996 (HIPAA). In the April 8 publication, the Departments submitted the group market information collection requirements, for, among other things, establishing creditable coverage, notice of special enrollment rights, and notice of pre-existing condition exclusion periods, to be Office of Management and Budget (OMB) for emergency review under the Paperwork Reduction Act of 1995 (PRA 95). In addition, on April 8, 1997 the Department of Health and Human Services submitted the HIPAA individual market information collection requirements to OMB for emergency review under the PRA 1995. This document amends the April 8 Federal Register documents to properly display the OMB control numbers.

  14. 17 CFR 210.8-03 - Interim financial statements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... (§ 249.308(a) of this chapter) must be reviewed by an independent public accountant using professional... accounting principles or practices. (Financial institutions should substitute net interest income for sales... occurred at the beginning of the periods. (5) Material accounting changes. Disclosure must be provided of...

  15. A review and update of the Virginia Department of Transportation's cash flow forecasting model : interim report.

    DOT National Transportation Integrated Search

    1995-01-01

    The Virginia Department of Transportation uses a cash flow forecasting model to predict operations expenditures by month. Components of this general forecasting model estimate line items in the VDOT budget. The cash flow model was developed in the ea...

  16. Compendium of Dental Residents’ Research Projects and Literature Reviews - 1990

    DTIC Science & Technology

    1991-03-01

    AL-SR-1991-0001 AD-A236 272 COMPENDIUM OF DENTAL RESIDENTS’ RESEARCH PROJECTS AND LITERATURE REVIEWS 1990 CDTIC JNO 6INSi3 Samuel P. Davis...USAF Dental Investigation Service Armstrong Laboratory Human Systems Division (AFSC) 91-01146 Brooks Air Force Base, TX 78235-5000 .,....,,.,,.l. ltfl 91...L, / 041 4li NOTICES This interim special report was submitted by personnel of the Dental Investigation Service, Clinical Sciences Division

  17. 21 CFR 330.12 - Status of over-the-counter (OTC) drugs previously reviewed under the Drug Efficacy Study (DESI).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... promulgation of a monograph. (b) On and after April 20, 1972, a number of notices were published in the Federal... classes of OTC drugs. At such time as an applicable OTC drug monograph becomes effective, the interim...

  18. 21 CFR 330.12 - Status of over-the-counter (OTC) drugs previously reviewed under the Drug Efficacy Study (DESI).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... promulgation of a monograph. (b) On and after April 20, 1972, a number of notices were published in the Federal... classes of OTC drugs. At such time as an applicable OTC drug monograph becomes effective, the interim...

  19. Development of an improved overlay design procedure for Oregon : vol. I, interim report, background and framework.

    DOT National Transportation Integrated Search

    1986-12-01

    This report is the first in a three-volume series dealing with the development of an improved overlay design procedure for Oregon. This report presents the results of the first-year findings and includes: (1) a detailed review of the literature; (2) ...

  20. 76 FR 18813 - China Changjiang Mining & New Energy Co., Ltd.; Order of Suspension of Trading

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ... and completeness of information contained in CHJI's public filings with the Commission concerning..., 2010 without the required review of the interim financial statements by an independent public accountant; and (b) the company's independent auditor has resigned, withdrawn its audit opinion issued April...

  1. 77 FR 197 - Federal Acquisition Regulation; Public Access to the Federal Awardee Performance and Integrity...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ...), excluding past performance reviews, shall be made publicly available. The interim rule notified contractors... not making ``past performance information'' available. Further, the respondent feared that it is only a matter of time before the Government also allows the public access to Government contractor ``past...

  2. The Brave New World of the Interim Superintendency

    ERIC Educational Resources Information Center

    Bigham, Gary D.

    2011-01-01

    Considering the vital role the superintendent plays in the overall functioning and well-being of any school district, the filling of the top leadership post with a permanent appointment never should be done in haste. The process of advertising, reviewing applications, conducting background checks, interviewing candidates, negotiating contracts,…

  3. California; Bay Area Air Quality Management District; Proposed Approval of Stationary Sources New Source Review

    EPA Pesticide Factsheets

    EPA is making an interim final determination to defer imposition of sanctions based on a proposed determination that CARB submitted rules on behalf of BAAQMD that satisfy part D of the Clean Air Act for areas under the jurisdiction of the BAAQMD.

  4. Arthroscopic treatment options for irreparable rotator cuff tears of the shoulder

    PubMed Central

    Anley, Cameron M; Chan, Samuel KL; Snow, Martyn

    2014-01-01

    The management of patients with irreparable rotator cuff tears remains a challenge for orthopaedic surgeons with the final treatment option in many algorithms being either a reverse shoulder arthroplasty or a tendon transfer. The long term results of these procedures are however still widely debated, especially in younger patients. A variety of arthroscopic treatment options have been proposed for patients with an irreparable rotator cuff tear without the presence of arthritis of the glenohumeral joint. These include a simple debridement with or without a biceps tenotomy, partial rotator cuff repair with or without an interval slide, tuberplasty, graft interposition of the rotator cuff, suprascapular nerve ablation, superior capsule reconstruction and insertion of a biodegradable spacer (Inspace) to depress the humeral head. These options should be considered as part of the treatment algorithm in patients with an irreparable rotator cuff and could be used as either as an interim procedure, delaying the need for more invasive surgery in the physiologically young and active, or as potential definitive procedures in the medically unfit. The aim of this review is to highlight and summarise arthroscopic procedures and the results thereof currently utilised in the management of these challenging patients. PMID:25405083

  5. 76 FR 4369 - Interim Deputation Agreements; Interim BIA Adult Detention Facility Guidelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... Adult Detention Facility Guidelines AGENCY: Bureau of Indian Affairs, Interior. ACTION: Notice. SUMMARY: This notice announces the online publication of the Interim BIA Adult Detention Facility Guidelines and... Indian Affairs Web site. DATES: These Interim BIA Adult Detention Facility Guidelines and Interim Model...

  6. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...

  7. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...

  8. 75 FR 984 - Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-07

    ... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites AGENCY... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response... interim PRGs for dioxin in soil. These draft recommended interim PRGs were calculated using existing, peer...

  9. Incident physical disability in people with lower extremity peripheral arterial disease: the role of cardiovascular disease.

    PubMed

    Brach, Jennifer S; Solomon, Cam; Naydeck, Barbara L; Sutton-Tyrrell, Kim; Enright, Paul L; Jenny, Nancy Swords; Chaves, Paulo M; Newman, Anne B

    2008-06-01

    To evaluate the risk of incident physical disability and the decline in gait speed over a 6-year follow-up associated with a low ankle-arm index (AAI) in older adults. Observational cohort study. Forsyth County, North Carolina; Sacramento County, California; Washington County, Maryland; and Allegheny County, Pennsylvania. Four thousand seven hundred five older adults, 58% women and 17.6% black, participating in the Cardiovascular Health Study. AAI was measured in 1992/93 (baseline). Self-reported mobility, activity of daily living (ADL), and instrumental activity of daily living (IADL) disability and gait speed were recorded at baseline and at 1-year intervals over 6 years of follow-up. Mobility disability was defined as any difficulty walking half a mile and ADL and IADL disability was defined as any difficulty with 11 specific ADL and IADL tasks. Individuals with mobility, ADL, or IADL disability at baseline were excluded from the respective incident disability analyses. Lower baseline AAI values were associated with increased risk of mobility disability and ADL/IADL disability. Clinical cardiovascular disease (CVD), diabetes mellitus, and interim CVD events partially explained these associations for mobility disability and clinical CVD and diabetes mellitus partially explained these associations for ADL and IADL disability. Individuals with an AAI less than 0.9 had on average a mean decrease in gait speed of 0.02 m/s per year, or a decline of 0.12 m/s over the 6-year follow-up. Prevalent CVD partly explained this decrease but interim CVD events did not further attenuate it. Low AAI serves as marker of future disability risk. Reduction of disability risk in patients with a low AAI should consider cardiovascular comorbidity and the prevention of additional disabling CVD events.

  10. Efficacy and safety of cisplatin, dexamethasone, gemcitabine and pegaspargase (DDGP) regimen in newly diagnosed, advanced-stage extranodal natural killer/T-cell lymphoma: interim analysis of a phase 4 study NCT01501149

    PubMed Central

    Li, Ling; Li, Xin; Wang, Xinhua; Fu, Xiaorui; Ma, Wang; Qin, Yanru; Li, Wencai; Wu, Jingjing; Sun, Zhenchang; Zhang, Xudong; Nan, Feifei; Chang, Yu; Li, Zhaoming; Zhang, Dandan; Wang, Guannan; Yan, Jiaqin; Su, Liping; Wang, Jinghua; Xue, Hongwei; Young, Ken H.; Zhang, Mingzhi

    2016-01-01

    To explore a more effective treatment for newly diagnosed, advanced-stage extranodal natural killer/T-cell lymphoma, nasal type (ENKTL), we conducted a phase 4 study of the cisplatin, dexamethasone, gemcitabine, pegaspargase (DDGP) regimen. The primary end point was the 2-year progression-free survival (PFS) after the protocol treatment. Secondary endpoints included response rate (RR), overall survival (OS) and median survival time (MST). The interim analysis included data only from March 2011 to September 2013, who received six cycles of DDGP chemotherapy. A total of 25 eligible patients were enrolled. Seventeen patients (17/24, 70.83%) achieved complete response (CR) and four (4/24, 16.67%) achieved partial response (PR), three (3/24, 12.50%) had progressive disease (PD). The RR after treatment was 87.50%. After a median follow-up duration of 24.67 months (range 4-48 months). The 2-year PFS and OS rate were 61.80% (95% CI, 42.00% to 81.60%) and 68.50 % (95% CI, 48.70% to 88.30%), respectively. The MST was 36.55 months (95% CI, 29.41 months to 43.70 months). Grade 3/4 leukopenia occurred in fourteen patients (58.33%) and grade 3/4 thrombocytopenia occurred in eleven patients (45.83%). Twelve patients (50.00%) experienced Activated Partial Phromboplastin Ptime (APTT) elongation and fourteen patients (58.33%) experienced hypofibrinogenemia. In conclusion, DDGP regimen is an effective and tolerated treatment for newly diagnosed, advanced-stage ENKTL. This trial was registered at www.ClinicalTrials.gov as #NCT01501149. PMID:27384676

  11. Evaluation of the HOPE Act: New State Services for Street Youth. Interim Report.

    ERIC Educational Resources Information Center

    McLain, Barbara

    This report reviews the effectiveness of Washington's HOPE Centers and Responsible Living Skills Programs (RLSPs) and reports findings and recommendations. In 1999, state legislators enacted the HOPE Act, which created these two services. HOPE Centers are temporary residential facilities where street youth can stay for 30 days while being…

  12. 78 FR 10554 - Interim Final Determination To Stay and Defer Sanctions, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-14

    ... Determination To Stay and Defer Sanctions, Sacramento Metropolitan Air Quality Management District AGENCY... on a proposed approval of a revision to the Sacramento Metropolitan Air Quality Management District... therefore is not subject to review by the Office of Management and Budget. This action is not subject to...

  13. 78 FR 56752 - Interim Staff Guidance Specific Environmental Guidance for Integral Pressurized Water Reactors...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-13

    ... (iPWR). This guidance applies to environmental reviews associated with iPWR applications for limited... received on or before this date. ADDRESSES: You may submit comments by any of the following methods (unless... this document. You may access publicly-available information related to this document by any of the...

  14. Project Student Concerns: A Study of Minority Student Suspensions. Interim Report.

    ERIC Educational Resources Information Center

    Bickel, Frank; Qualls, Robert

    This report is a summary of research completed during the 1978-79 school year concerning the causes of disproportionate minority student suspensions in the Jefferson County public schools. A review of related literature is presented to illustrate that factors other than student behavior may contribute to school disruptions and high rates of…

  15. 17 CFR 229.601 - (Item 601) Exhibits.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... accountant regarding non-reliance on a previously issued audit report or completed interim review X (8... X X X X X X (16) Letter re change in certifying accountant 4 X X X X X X (17) Correspondence on... Form. (6) [Reserved] (7) Correspondence from an independent accountant regarding non-reliance on a...

  16. Space Communications Capability Roadmap Interim Review

    NASA Technical Reports Server (NTRS)

    Spearing, Robert; Regan, Michael

    2005-01-01

    Contents include the following: Identify the need for a robust communications and navigation architecture for the success of exploration and science missions. Describe an approach for specifying architecture alternatives and analyzing them. Establish a top level architecture based on a network of networks. Identify key enabling technologies. Synthesize capability, architecture and technology into an initial capability roadmap.

  17. 77 FR 11355 - Defense Federal Acquisition Regulation Supplement; Business Systems-Definition and Administration...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... the interim rule. Contractor business systems and internal controls are the first line of defense... contractor's accounting system shall provide for management reviews or internal audits of the contractor's... controls as part of any evaluation as to the reliability of information produced by a business system(s...

  18. 40 CFR 96.284 - Opt-in process.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR SO2 Opt-in Units... of interim review, if the plan appears to contain information demonstrating that the SO2 emissions... section, the owner or operator shall monitor and report the SO2 emissions rate and the heat input of the...

  19. Senior 4 Western Civilization: An Historical Review of Its Development. Interim Curriculum Document.

    ERIC Educational Resources Information Center

    Manitoba Dept. of Education and Training, Winnipeg. School Programs Div.

    This guide complements the two other social studies documents at the Senior 4 level for the social studies curriculum sequence for schools in Manitoba, Canada. The primary focus of this document is to explore the impact made by significant historical developments, movements, and individuals that shaped and influenced Western Civilization…

  20. 75 FR 69917 - New NOAA Cooperative Institutes (CIs): (1) A Cooperative Institute To Improve Mesoscale and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... described in the proposal? Is there a well-developed business plan that includes fiscal and human resource... the Area of Marine Resources AGENCY: Oceanic and Atmospheric Research (OAR), National Oceanic and... resources. Applicants should review the CI Interim Handbook prior to preparing a proposal for this...

  1. 78 FR 21980 - Aging Management of Internal Surfaces, Service Level III and Other Coatings, Atmospheric Storage...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0068] Aging Management of Internal Surfaces, Service Level... Interim Staff Guidance (LR-ISG), LR-ISG-2012-02, ``Aging Management of Internal Surfaces, Service Level... proposes to revise NRC staff-recommended aging management programs (AMP) and aging management review (AMR...

  2. 78 FR 49782 - Interim Staff Guidance on Changes During Construction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-15

    ... seven comments on the Draft ISG from the Nuclear Energy Institute (NEI) (ADAMS Accession No. ML12089A019... construction impacts evaluation and the 10 CFR 50.59- like review (including applicability determination..., the construction impacts evaluation and the 10 CFR 50.59 and 10 CFR 50-59-like evaluation (including...

  3. The evolving story of information assurance at the DoD.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Campbell, Philip LaRoche

    2007-01-01

    This document is a review of five documents on information assurance from the Department of Defense (DoD), namely 5200.40, 8510.1-M, 8500.1, 8500.2, and an ''interim'' document on DIACAP [9]. The five documents divide into three sets: (1) 5200.40 & 8510.1-M, (2) 8500.1 & 8500.2, and (3) the interim DIACAP document. The first two sets describe the certification and accreditation process known as ''DITSCAP''; the last two sets describe the certification and accreditation process known as ''DIACAP'' (the second set applies to both processes). Each set of documents describes (1) a process, (2) a systems classification, and (3) a measurement standard.more » Appendices in this report (a) list the Phases, Activities, and Tasks of DITSCAP, (b) note the discrepancies between 5200.40 and 8510.1-M concerning DITSCAP Tasks and the System Security Authorization Agreement (SSAA), (c) analyze the DIACAP constraints on role fusion and on reporting, (d) map terms shared across the documents, and (e) review three additional documents on information assurance, namely DCID 6/3, NIST 800-37, and COBIT{reg_sign}.« less

  4. Characterization of the radiation environment for a large-area interim spent-nuclear-fuel storage facility

    NASA Astrophysics Data System (ADS)

    Fortkamp, Jonathan C.

    Current needs in the nuclear industry and movements in the political arena indicate that authorization may soon be given for development of a federal interim storage facility for spent nuclear fuel. The initial stages of the design work have already begun within the Department of Energy and are being reviewed by the Nuclear Regulatory Commission. This dissertation addresses the radiation environment around an interim spent nuclear fuel storage facility. Specifically the dissertation characterizes the radiation dose rates around the facility based on a design basis source term, evaluates the changes in dose due to varying cask spacing configurations, and uses these results to define some applicable health physics principles for the storage facility. Results indicate that dose rates from the facility are due primarily from photons from the spent fuel and Co-60 activation in the fuel assemblies. In the modeled cask system, skyshine was a significant contribution to dose rates at distances from the cask array, but this contribution can be reduced with an alternate cask venting system. With the application of appropriate health physics principles, occupation doses can be easily maintained far below regulatory limits and maintained ALARA.

  5. Explanation of Change Cost and Schedule Growth Study Interim Status Briefing

    NASA Technical Reports Server (NTRS)

    Croonce, Thomas; Bitten, Bob; Emmons, Debra

    2010-01-01

    This slide presentation reviews the study to understand the changes in cost and schedule growth for NASA projects. A second goal was to determine the percentage of growth that was outside the control of the project. The study examined project documentation, conducted interviews with key project personnel, and allocated growth events to an Explanation of Change (EoC) tree to quantify the reasons for growth in the scheduled time. This briefing reviews the results of the study of the first 20 missions.

  6. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 2 2011-01-01 2011-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or...

  7. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or...

  8. Interim Expertise

    ERIC Educational Resources Information Center

    Anyaso, Hilary Hurd

    2009-01-01

    The Registry for College and University Presidents places former executives in interim presidential and other senior-level posts and is familiar with the challenges interim executives and institutions encounter in times of leadership transitions. However, the one big advantage interims bring to institutions, says Registry Vice President Kevin J.…

  9. 75 FR 8411 - Office of New Reactors: Interim Staff Guidance on Assessing the Consequences of an Accidental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ... the public will be better served by being able to review and comment on both documents at this time... Construction Inspection and Operational Programs, Office of New Reactors, U.S. Nuclear Regulatory Commission... conditions for such releases and define acceptable assumptions to describe exposure scenarios and pathways to...

  10. Harvard University Program on Technology and Society 1964-1972. A Final Review.

    ERIC Educational Resources Information Center

    Harvard Univ., Cambridge, MA. Program on Technology and Society.

    Eight years of research by the Harvard University's Program on Technology and Society are summarized. Lengthy abstracts of the 29 books and 164 articles that resulted from the Program, as well as interim accounts of projects not yet completed are presented. The report is divided into four parts; institutions (including business, education, and…

  11. Accidental Government Documents Librarian: A Review of Experiences and Training Needs of Interim Documents Librarians

    ERIC Educational Resources Information Center

    Yelinek, Kathryn; Hinchcliff, Marilou

    2009-01-01

    The results of a survey to determine the training needs and normative experiences of temporary government documents librarians are presented. The results indicate that temporary librarians tend to work in academia, have been in librarianship for a shorter time period, and have fewer technical processing skills than permanent documents librarians.…

  12. Respite Care. Briefing Paper. Interim Update.

    ERIC Educational Resources Information Center

    Ambler, Lana; Kupper, Lisa, Ed.

    The challenges that families face in caring for a child with a disability or a chronic illness are reviewed in this report on respite care. A parent's narrative describes the difficulties in providing around-the-clock care to a child with a chronic illness. The benefits of respite care are outlined as follows: gives the family peace of mind,…

  13. Taxonomy of Learning Skills. Interim Technical Report for the Period February 1986-1987.

    ERIC Educational Resources Information Center

    Kyllonen, Patrick C.; Shute, Valerie J.

    Questions concerning individual differences in learning ability may be more precisely addressed in light of an agreed-upon taxonomy of learning skills. Existing taxonomies are reviewed, and their shortcomings are described. A taxonomy is then proposed based on a synthesis of current thought consisting of four dimensions: the forms of knowledge;…

  14. 77 FR 16001 - Interim Procedures for Considering Requests Under the Commercial Availability Provision of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-19

    ... reasons it is not currently produced or offered. (iii) If the subject product involves a style, weight, or... offered. (iv) If the subject product involves a style, weight, or other variation that is new to the... information collection is subject to review and approval by the Office of Management and Budget's (``OMB...

  15. 78 FR 70070 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Annual...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-22

    ... DOL released EBSA Field Assistance Bulletin (FAB) 2013-01 concerning the new disclosure requirements mandated by MAP-21 provisions. The FAB addresses a need for interim guidance pending the adoption of regulations or other guidance under ERISA section 101(f), as amended by the MAP-21. The FAB sets forth...

  16. 42 CFR Appendix to Subpart G of... - Interim Procedures and Criteria for Review by Health Systems Agencies of Applications Under...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND MODERNIZATION Community Service Pt. 124, Subpt. G... the area. 6. The availability of resources (including health manpower, management personnel, and funds... alternative uses of such resources for the provision of other health services. 7. The special needs and...

  17. 42 CFR Appendix to Subpart G of... - Interim Procedures and Criteria for Review by Health Systems Agencies of Applications Under...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND MODERNIZATION Community Service Pt. 124, Subpt. G... the area. 6. The availability of resources (including health manpower, management personnel, and funds... alternative uses of such resources for the provision of other health services. 7. The special needs and...

  18. 42 CFR Appendix to Subpart G of... - Interim Procedures and Criteria for Review by Health Systems Agencies of Applications Under...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND MODERNIZATION Community Service Pt. 124, Subpt. G... the area. 6. The availability of resources (including health manpower, management personnel, and funds... alternative uses of such resources for the provision of other health services. 7. The special needs and...

  19. 78 FR 37698 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-67; Small Entity Compliance Guide

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ............ Contracting with 2013-010 Morgan. Women-owned Small Business Concerns (Interim). VIII Deletion of Report 2013... panel, consists of senior-level DoD officials from across DoD working to review progress made by DoD to... ensure that CORs understand their duties and responsibilities to survey contractor performance. This...

  20. 78 FR 25487 - Final License Renewal Interim Staff Guidance LR-ISG-2012-01: Wall Thinning Due to Erosion Mechanisms

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-01

    ....'' This LR-ISG revises an NRC staff-recommended aging management program (AMP) in NUREG-1801, Revision 2, ``Generic Aging Lessons Learned (GALL) Report,'' and the NRC staff's aging management review procedure and... for piping and components within the scope of the Requirements for Renewal of Operating Licenses for...

  1. Review of the Ontario Operating Grants Formula. Interim Report.

    ERIC Educational Resources Information Center

    Council of Ontario Universities, Toronto.

    The Operating Grants Formula utilized by the Council of Ontario Universities, has as its sole purpose to provide an objective mechanism for determining the share of the total provincial operating grant to be allocated to each university. It is not intended to limit or control the expenditure of funds granted to the universities, but institutions…

  2. 24 CFR 35.1330 - Interim controls.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim controls. 35.1330 Section... Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim controls of lead-based paint hazards identified in a risk assessment shall be conducted in accordance with...

  3. 7 CFR 1738.21 - Interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1738.21 Section 1738.21... Interim financing. (a) Upon notification by RUS that an applicant's application is considered complete, the applicant may enter into an interim financing agreement with a lender other than RUS or use its...

  4. An Approach for Evaluating the Technical Quality of Interim Assessments

    ERIC Educational Resources Information Center

    Li, Ying; Marion, Scott; Perie, Marianne; Gong, Brian

    2010-01-01

    Increasing numbers of schools and districts have expressed interest in interim assessment systems to prepare for summative assessments and to improve teaching and learning. However, with so many commercial interim assessments available, schools and districts are struggling to determine which interim assessment is most appropriate to their needs.…

  5. 47 CFR 51.611 - Interim wholesale rates.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... selecting a particular discount rate. The same discount percentage rate shall be used to establish interim... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim wholesale rates. 51.611 Section 51.611... Resale § 51.611 Interim wholesale rates. (a) If a state commission cannot, based on the information...

  6. 7 CFR 15a.71 - Interim procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Interim procedures. 15a.71 Section 15a.71 Agriculture Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM FEDERAL FINANCIAL ASSISTANCE Procedures (Interim) § 15a.71 Interim procedures. For the purposes of...

  7. 77 FR 55230 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-01; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0068] Japan Lessons-Learned Project Directorate Interim... Commission (NRC). ACTION: Japan Lessons-Learned Project Directorate interim staff guidance; issuance. SUMMARY...-Learned Project Directorate Interim Staff Guidance (JLD-ISG), JLD-ISG-2012-01, ``Compliance with Order EA...

  8. 77 FR 55231 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-02; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0069] Japan Lessons-Learned Project Directorate Interim...-Learned Project Directorate interim staff guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate Interim...

  9. 7 CFR 1735.75 - Interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1735.75 Section 1735.75... Involving Loan Funds § 1735.75 Interim financing. (a) A borrower may submit a written request for RUS approval of interim financing if it is necessary to close an acquisition before the loan to finance the...

  10. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  11. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  12. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  13. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  14. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  15. Recruitment failure and futility were the most common reasons for discontinuation of clinical drug trials. Results of a nationwide inception cohort study in the Netherlands.

    PubMed

    van den Bogert, Cornelis A; Souverein, Patrick C; Brekelmans, Cecile T M; Janssen, Susan W J; Koëter, Gerard H; Leufkens, Hubert G M; Bouter, Lex M

    2017-08-01

    The objective of the study was to identify the reasons for discontinuation of clinical drug trials and to evaluate whether efficacy-related discontinuations were adequately planned in the trial protocol. All clinical drug trials in the Netherlands, reviewed by institutional review boards in 2007, were followed until December 2015. Data were obtained through the database of the Dutch competent authority (Central Committee on Research Involving Human Subjects [CCMO]) and a questionnaire to the principal investigators. Reasons for trial discontinuation were the primary outcome of the study. Three reasons for discontinuation were analyzed separately: all cause, recruitment failure, and efficacy related (when an interim analysis had demonstrated futility or superiority). Among the efficacy-related discontinuations, we examined whether the data monitoring committee, the stopping rule, and the moment of the interim analysis in the trial progress were specified in the trial protocol. Of the 574 trials, 102 (17.8%) were discontinued. The most common reasons were recruitment failure (33 of 574; 5.7%) and solely efficacy related (30 of 574; 5.2%). Of the efficacy-related discontinuations, 10 of 30 (33.3%) of the trial protocols reported all three aspects in the trial protocol, and 20 of 30 (66.7%) reported at least one aspect in the trial protocol. One out of five clinical drug trials is discontinued before the planned trial end, with recruitment failure and futility as the most common reasons. The target sample size of trials should be feasible, and interim analyses should be adequately described in trial protocols. Copyright © 2017 Elsevier Inc. All rights reserved.

  16. 12 CFR 552.2-2 - Procedures for organization of interim Federal stock association.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Procedures for organization of interim Federal stock association. (a) Applications for permission to organize... chapter or § 552.2-1(b)(3) of this part. (b) Approval of an application for permission to organize an... the interim was chartered to facilitate. Applications for permission to organize an interim Federal...

  17. Final Report: Characterization of Canister Mockup Weld Residual Stresses

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Enos, David; Bryan, Charles R.

    2016-12-01

    Stress corrosion cracking (SCC) of interim storage containers has been indicated as a high priority data gap by the Department of Energy (DOE) (Hanson et al., 2012), the Electric Power Research Institute (EPRI, 2011), the Nuclear Waste Technical Review Board (NWTRB, 2010a), and the Nuclear Regulatory Commission (NRC, 2012a, 2012b). Uncertainties exist in terms of the environmental conditions that prevail on the surface of the storage containers, the stress state within the container walls associated both with weldments as well as within the base metal itself, and the electrochemical properties of the storage containers themselves. The goal of the workmore » described in this document is to determine the stress states that exists at various locations within a typical storage canister by evaluating the properties of a full-diameter cylindrical mockup of an interim storage canister. This mockup has been produced using the same manufacturing procedures as the majority of the fielded spent nuclear fuel interim storage canisters. This document describes the design and procurement of the mockup and the characterization of the stress state associated with various portions of the container. It also describes the cutting of the mockup into sections for further analyses, and a discussion of the potential impact of the results from the stress characterization effort.« less

  18. 76 FR 14559 - Federal Acquisition Regulation; Justification and Approval of Sole-Source 8(a) Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-16

    ... Space Administration (NASA). ACTION: Interim rule. SUMMARY: DoD, GSA, and NASA are issuing an interim..., and NASA are issuing an interim rule amending the FAR, to implement section 811 of the National... meetings, DoD, GSA, and NASA weighed the costs and benefits of publishing this rule as proposed or interim...

  19. Interim Administrators in Higher Education: A National Study

    ERIC Educational Resources Information Center

    Huff, Marie Thielke; Neubrander, Judy

    2015-01-01

    The focus of this paper is on the roles and experiences of interim administrators in higher education. A survey was given to current and recent interim administrators in four-year public universities and colleges across the United States. The goals were to identify the advantages and disadvantages of using and serving as interims, and to solicit…

  20. A Process Evaluation of Project Developmental Continuity. Interim Report II, Part A: Program Case Studies. Volume 2.

    ERIC Educational Resources Information Center

    Spencer, Lynn, Ed.

    These 7 case studies are part of a series of documents on the evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Each case study reviews the planning year at a PDC demonstration site in one…

  1. A Process Evaluation of Project Developmental Continuity. Interim Report II, Part A: Program Case Studies. Volume I.

    ERIC Educational Resources Information Center

    Spencer, Lynn, Ed.

    These 8 case studies are part of a series of documents on the evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Each case study reviews the planning year at a PDC demonstration site in one…

  2. 78 FR 62430 - Department of Defense (DoD)-Defense Industrial Base (DIB) Voluntary Cyber Security and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-22

    ... National Defense Authorization Act for Fiscal Year 2013. Comments DoD published an interim final rule on May 11, 2012 (77 FR 27615). Fifty comments from twelve respondents were received and reviewed by the... year. Public Law 96-354, ``Regulatory Flexibility Act'' (5 U.S.C. 601) It has been certified that 32...

  3. Manifestation Determination Reviews and School Team Decision-Making with Students with Emotional/Behavioral Disabilities

    ERIC Educational Resources Information Center

    Walker, Jennifer D.

    2013-01-01

    Manifestation determination teams are required by law to determine the relationship between a student's disability and behaviors that lead to disciplinary action when a student with a disability is either excluded from school for more than 10 days, is put in an interim alternative placement, or is under consideration for a change in placement.…

  4. Review and Assessment of the Health and Productivity Benefits of Green Schools: An Interim Report

    ERIC Educational Resources Information Center

    National Academies Press, 2006

    2006-01-01

    Some educational professionals have suggested that so-called green schools would result in superior performance and increased health for students and teachers. While there is no commonly accepted definition of a green school, there are a number of attributes that such schools appear to have: low cost operations, security, healthy and comfortable,…

  5. 76 FR 58846 - Final Interim Staff Guidance: Review of Evaluation To Address Gas Accumulation Issues in Safety...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-22

    ... of the comments. A document comparing the version of the ISG that went out for public comment and the final version of the ISG can be found under ADAMS Accession No. ML111170302. ADDRESSES: Publicly... its issued staff guidance in the agency external web page ( http://www.nrc.gov/reading-rm/doc...

  6. 75 FR 51499 - Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on Digital I&C...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-20

    ... NUCLEAR REGULATORY COMMISSION Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on Digital I&C Systems The ACRS Subcommittee on Digital Instrumentation and Controls (I&C) Systems...: Wednesday, September 8, 2010--8:30 a.m. until 12 p.m. The Subcommittee will review Digital I&C Interim Staff...

  7. Job Enrichment: Evaluation with Implications for Air Force Job Redesign. Interim Report, 1 January 1975-30 April 1977.

    ERIC Educational Resources Information Center

    Watson, Thomas W.; Zumbro, Patrick A.

    The main text of this report consists of a review and evaluation of job enrichment as an approach to job redesign, with implications for Air Force research and application. In addition, two appendixes are included: the first, a supplemental historical discussion; the second, a ninety-six-item annotated bibliography. Specific objectives are to…

  8. 76 FR 50284 - Request for Public Comments on Interim Review of Eligibility of Cote d'Ivoire, Guinea, and Niger...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... Eligibility of Cote d'Ivoire, Guinea, and Niger for Benefits Under the African Growth and Opportunity Act.... SUMMARY: The African Growth and Opportunity Act Implementation Subcommittee of the Trade Policy Staff... eligibility of Cote d'Ivoire, Guinea, and Niger to receive the benefits of the African Growth and Opportunity...

  9. 75 FR 5632 - Office of New Reactors; Interim Staff Guidance on the Review of Nuclear Power Plant Designs Using...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-03

    ....8 and Regulatory Guide 1.206, ``Combined License Applications for Nuclear Power Plants (LWR Edition... Management System (ADAMS) Accession No. ML092640035). This ISG provides new guidance information for... (SRP), Section 8.3.1 and Sections 9.5.4 through 9.5.8. The NRC staff issues DC/COL-ISGs to facilitate...

  10. Space Transfer Vehicle Concepts and Requirements Study. Volume 2, Book 2: System and Program Requirements Trade Studies

    NASA Technical Reports Server (NTRS)

    Weber, Gary A.

    1991-01-01

    During the 90-day study, support was provided to NASA in defining a point-of-departure space transfer vehicle (STV). The resulting STV concept was performance optimized with a two-stage LTV/LEV configuration. Appendix A reports on the effort during this period of the study. From the end of the 90-day study until the March Interim Review, effort was placed on optimizing the two-stage vehicle approach identified in the 90-day effort. After the March Interim Review, the effort was expanded to perform a full architectural trade study with the intent of developing a decision database to support STV system decisions in response to changing SEI infrastructure concepts. Several of the architecture trade studies were combined in a System Architecture Trade Study. In addition to this trade, system optimization/definition trades and analyses were completed and some special topics were addressed. Program- and system-level trade study and analyses methodologies and results are presented in this section. Trades and analyses covered in this section are: (1) a system architecture trade study; (2) evolution; (3) safety and abort considerations; (4) STV as a launch vehicle upper stage; and (5) optimum crew and cargo split.

  11. Assessment of phthalates/phthalate alternatives in children's toys and childcare articles: Review of the report including conclusions and recommendation of the Chronic Hazard Advisory Panel of the Consumer Product Safety Commission.

    PubMed

    Lioy, Paul J; Hauser, Russ; Gennings, Chris; Koch, Holger M; Mirkes, Philip E; Schwetz, Bernard A; Kortenkamp, Andreas

    2015-01-01

    The Consumer Product Safety Commission (CPSC) convened a Chronic Hazard Advisory Panel (CHAP) on Phthalates found in children's toys, and childcare products, and in products used by women of childbearing age. The CHAP conducted a risk assessment on phthalates and phthalate substitutes, and made recommendations to either ban, impose an interim ban, or allow the continued use of phthalates and phthalate substitutes in the above products. After a review of the literature, the evaluation included toxic end points of primary concern, biomonitoring results, extant exposure reconstruction, and epidemiological results. The health end points chosen were associated with the rat phthalate syndrome, which is characterized by malformations of the epididymis, vas deferens, seminal vesicles, prostate, external genitalia (hypospadias), and by cryptorchidism (undescended testes), retention of nipples/areolae, and demasculinization (~incomplete masculinization) of the perineum, resulting in reduced anogenital distance. Risk assessment demonstrated that some phthalates should be permanently banned, removed from the banned list, or remain interim banned. Biomonitoring and toxicology data provided the strongest basis for a mixture risk assessment. In contrast, external exposure data were the weakest and need to be upgraded for epidemiological studies and risk assessments. Such studies would focus on routes and sources. The review presents recommendations and uncertainties.

  12. Faster-than-light particles: a review of tachyon characteristics. Interim report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Puscher, E.A.

    1980-10-01

    This report documents an analytical prediction of some of the characteristics which presently undiscovered faster-than-light sub-atomic particles (called tachyons) must possess if they are to exist without violating the Theory of Special Relativity. A brief review of necessary concepts from the Special Theory is included so that the reader might more readily understand the reasoning as it is developed. Necessary, but not all, characteristics of tachyons are then identified and presented. Finally, an interesting potential relationship between tachyons and anti-gravity is discussed.

  13. Interim Guidance on New Source Review (NSR) Questions Raised in Letters Dated September 9 and 24, 1992.

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  14. Radioactive Wastes.

    PubMed

    Choudri, B S; Charabi, Yassine; Baawain, Mahad; Ahmed, Mushtaque

    2017-10-01

    Papers reviewed herein present a general overview of radioactive waste related activities around the world in 2016. The current reveiw include studies related to safety assessments, decommission and decontamination of nuclear facilities, fusion facilities, transportation. Further, the review highlights on management solutions for the final disposal of low and high level radioactive wastes (LLW and HLW), interim storage and final disposal options for spent fuel (SF), and tritiated wastes, with a focus on environmental impacts due to the mobility of radionuclides in ecosystem, water and soil alongwith other progress made in the management of radioactive wastes.

  15. Proposed Guidance for Preparing and Reviewing Molten Salt Nonpower Reactor Licence Applications (NUREG-1537)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Belles, Randy; Flanagan, George F.; Voth, Marcus

    Development of non-power molten salt reactor (MSR) test facilities is under consideration to support the analyses needed for development of a full-scale MSR. These non-power MSR test facilities will require review by the US Nuclear Regulatory Commission (NRC) staff. This report proposes chapter adaptations for NUREG-1537 in the form of interim staff guidance to address preparation and review of molten salt non-power reactor license applications. The proposed adaptations are based on a previous regulatory gap analysis of select chapters from NUREG-1537 for their applicability to non-power MSRs operating with a homogeneous fuel salt mixture.

  16. Petition to request an exemption from 100 percent identity testing of dietary ingredients: Current Good Manufacturing Practice in Manufacturing, Packaging, Labeling, or Holding Operations for Dietary Supplements. Interim final rule.

    PubMed

    2007-06-25

    The Food and Drug Administration (FDA) is issuing an interim final rule (IFR) that sets forth a procedure for requesting an exemption from the requirement in the final rule "Current Good Manufacturing Practice in Manufacturing, Packaging, Labeling, or Holding Operations for Dietary Supplements," published elsewhere in this issue of the Federal Register, that the manufacturer conduct at least one appropriate test or examination to verify the identity of any component that is a dietary ingredient. This IFR allows for submission to, and review by, FDA of an alternative to the required 100 percent identity testing of components that are dietary ingredients, provided certain conditions are met and establishes a requirement for retention of records relating to the FDA's response to an exemption request.

  17. Gary Refining Company emerges from Chapter 11 bankruptcy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1986-09-01

    On July 24, 1986 Gary Refining Company, Inc. announced that the Reorganization Plan for Gary Refining Company, Inc., Gary Refining Company, and Mesa Refining, Inc. has been approved by the United States bankruptcy Court (District of Colorado). The companies filed for protection from creditors on March 4, 1985 under Chapter 11 of the United States Bankruptcy Code. Payments to creditors are expected to begin upon start-up of the Gary Refining Company (GRC) refinery in Fruita, Colorado after delivery of shale oil from Union Oil's Parachute Creek plant. In the interim, GRC will continue to explore options for possible startup (onmore » a full scale or partial basis) prior to that time.« less

  18. 42 CFR 418.307 - Periodic interim payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (CONTINUED) MEDICARE PROGRAM HOSPICE CARE Payment for Hospice Care § 418.307 Periodic interim payments... payments. The biweekly interim payment amount is based on the total estimated Medicare payments for the...

  19. 17 CFR 229.601 - (Item 601) Exhibits.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... accountant regarding non-reliance on a previously issued audit report or completed interim review X (8) Opinion re tax matters X X X X X X X (9) Voting trust agreement X X X X X X X (10) Material contracts X X... X X X X X X (16) Letter re change in certifying accountant 4 X X X X X X (17) Correspondence on...

  20. Data Use "Multi-State" Spotlight: Using Data Fidelity Tools to Improve Data Quality. Transforming State Systems to Improve Outcomes for Children with Disabilities

    ERIC Educational Resources Information Center

    Ruedel, Kristin; Nelson, Gena; Bailey, Tessie

    2018-01-01

    To evaluate interim progress toward the State-identified Measurable Result (SIMR), states require access to high-quality data from local education agencies (LEAs) and early intervention service providers. In a review of 2017 Phase III State Systemic Improvement Plans (SSIP), 43 Part C states noted limitations or concerns related to data and…

  1. Applications of Should Cost to Achieve Cost Reductions

    DTIC Science & Technology

    2014-04-01

    Operation of the defense acquisition system . Interim DoD Instruction 5000.02. Washington, DC: Office of the Deputy Secretary of Defense. Gutterman...including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson...FAR) § 15.407-4 that refers primarily to an extensive review of a contractor’s operations to identify and promote more economical and efficient

  2. Stars By Which to Navigate? Scanning National and International Education Standards in 2009. An Interim Report on Common Core, NAEP, TIMSS and PISA

    ERIC Educational Resources Information Center

    Carmichael, Sheila Byrd; Wilson, W. Stephen; Finn, Chester E., Jr.; Winkler, Amber M.; Palmieri, Stafford

    2009-01-01

    Subject-matter experts reviewed the content, rigor, and clarity of the first public drafts of the "Common Core" standards released in September 2009 by the Common Core State Standards Initiative (CCSSI) of the National Governors Association and Council of Chief State School Officers. Using the same criteria, the same experts also…

  3. 76 FR 52995 - Draft License Renewal Interim Staff Guidance LR-ISG-2011-05: Ongoing Review of Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-24

    ...- 2011-0191. Address questions about NRC dockets to Carol Gallagher, telephone: 301-492-3668; e-mail...): Publicly available documents created or received at the NRC are available online in the NRC Library at http...-800-397-4209, 301-415-4737, or by e-mail to [email protected] . The draft LR-ISG proposes to revise...

  4. Making Big High Schools Smaller. A Review of the Implementation of the House Plan in New York City's Most Troubled High Schools.

    ERIC Educational Resources Information Center

    Public Education Association, New York, NY.

    This interim report evaluates the implementation of the "House Plan," a plan to create small personalized schools within the 110 large comprehensive high schools in New York (New York) by subdividing all ninth grades into separate units. This evaluation covers only the 37 "dropout prevention" high schools which had been…

  5. Replacement of a hopeless maxillary central incisor: a technique for the fabrication of an immediate implant-supported interim restoration.

    PubMed

    Graiff, Lorenzo; Vigolo, Paolo

    2012-04-01

    Placement of a dental implant and an interim restoration in the esthetic zone immediately following tooth extraction is now a common procedure. However, in such clinical situations, the fabrication of an appropriate interim restoration may be challenging. The aim of this article is to present a technique for modifying the extracted tooth so it can be used as an implant-supported interim restoration.

  6. Letter to the editor regarding "GRAS from the ground up: Review of the Interim Pilot Program for GRAS notification" by.

    PubMed

    Sewalt, Vincent; LaMarta, James; Shanahan, Diane; Gregg, Lori; Carrillo, Roberto

    2017-09-01

    Present letter is aimed at clarifying some critical points highlighted by Hanlon et al. regarding the common knowledge element of the safety of food enzymes in support of their GRAS designation. Particularly, we outline the development of peer-reviewed, generally recognized safety evaluation methodology for microbial enzymes and its adoption by the enzyme industry, which provides the US FDA with a review framework for enzyme GRAS Notices. This approach may serve as a model to other food ingredient categories for a scientifically sound, rigorous, and transparent application of the GRAS concept. Copyright © 2017 Elsevier Ltd. All rights reserved.

  7. Interim Guidance on the Treatment of Condensable Particulate Matter Test Results in the Prevention of Significant Deterioration and Nonattainment New Source Review Permitting Programs

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  8. Different predictive values of interim 18F-FDG PET/CT in germinal center like and non-germinal center like diffuse large B-cell lymphoma.

    PubMed

    Kim, Jihyun; Lee, Jeong-Ok; Paik, Jin Ho; Lee, Won Woo; Kim, Sang Eun; Song, Yoo Sung

    2017-01-01

    Diffuse large B-cell lymphoma (DLBCL) is a pathologically heterogeneous disease with different prognoses according to its molecular profiles. Despite the broad usage of 18 F-fluoro-2-dexoxy-D-glucose (FDG) positron emission tomography/computed tomography (PET/CT), previous studies that have investigated the value of interim 18 F-FDG PET/CT in DLBCL have given the controversial results. The purpose of this study was to evaluate the prognostic value of interim 18 F-FDG PET/CT in DLBCL according to germinal center B cell-like (GCB) and non-GCB molecular profiling. We enrolled 118 newly diagnosed DLBCL patients treated with rituximab, cyclophosphamide, doxorubicin, vincristine, and prednisolone (R-CHOP). Interim 18 F-FDG PET/CT scans performed after 2 or 3 cycles of R-CHOP treatment were evaluated based on the Lugano response criteria. Patients were grouped as GCB or non-GCB molecular subtypes according to immunohistochemistry results of CD10, BCL6, and MUM1, based on Hans' algorithm. In total 118 DLBCL patients, 35 % were classified as GCB, and 65 % were classified as non-GCB. Interim PET/CT was negative in 70 %, and positive in 30 %. During the median follow-up period of 23 months, the positive interim 18 F-FDG PET/CT group showed significantly inferior progression free survival (PFS) compared to the negative interim 18 F-FDG PET/CT group (P = 0.0004) in entire patients. A subgroup analysis according to molecular profiling demonstrated significant difference of PFS between the positive and negative interim 18 F-FDG PET groups in GCB subtype of DLBCL (P = 0.0001), but there was no significant difference of PFS between the positive and negative interim 18 F-FDG PET groups in non-GCB subtype of DLBCL. Interim 18 F-FDG PET/CT scanning had a significant predictive value for disease progression in patients with the GCB subtype of DLBCL treated with R-CHOP, but not in those with the non-GCB subtype. Therefore, molecular profiles of DLBCL should be considered for interim 18 F-FDG PET/CT practice.

  9. Guidance: Interim Municipal Settlement Policy

    EPA Pesticide Factsheets

    Interim guidance and fact sheets regarding settlements involving municipalities or municipal waste under Section 122 CERCLA as amended by SARA. Interim policy sets forth the criteria by which EPA generally determines whether to exercise enforcement discretion to pursue MSW generators and transporters as PRPs.

  10. Cholesteric Liquid Crystal Glass Platinum Acetylides

    DTIC Science & Technology

    2014-06-01

    M. Krein AFRL/RXAP Ronald F. Ziolo, Eduardo Arias, and Ivana Moggio 2Centro de Investigacion en Quimica Aplicada(CIQA) Albert Fratini...estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the...valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. 1 . REPORT DATE (DD-MM-YYYY) June 2014 2. REPORT TYPE Interim 3

  11. Report of the Military Compensation and Retirement Modernization Commission Interim Report

    DTIC Science & Technology

    2014-06-01

    transfer into a bank account, rather than receiving a paper check to be cashed at the local bank. The Internet has also affected health care delivery...and web -based reporting is becoming commonplace, advances in diagnostic and imaging techniques have made the early detection of disease and early...Supporting Research Papers , Chapter 12: Review of Survivor Benefits, accessed June 1, 2014, http://militarypay.defense.gov/REPORTS/QRMC

  12. Government-Industry Data Exchange Program (GIDEP) and NASA Advisories

    NASA Technical Reports Server (NTRS)

    Sampson, Michael J.

    2010-01-01

    This viewgraph presentation reviews the Government-Industry Data Exchange Program (GIDEP) and NASA Advisories policy to practice. The contents include: 1) Purpose of the Government-Industry Data Exchange Program (GIDEP); 2) NASA and GSFC Documentation; 3) NASA Advisories, differences from GIDEP; 4) GIDEP Distribution by Originator; 5) New Interim GIDEP Policy for Suspect Counterfeits; 6) NASA and Suspect Counterfeits; 7) Threats to GIDEP; and 8) Conclusions and Contact Information.

  13. Assessing Weapon System Acquisition Cycle Times: Setting Program Schedules

    DTIC Science & Technology

    2015-06-01

    additional research, focused as follows: 1 . Acquisition schedule development: How are schedules for acquisition programs actually set and how are they...the germinating requirements documents specific to systems reviewed. A clear statement was found for only one system (Air and Missile Defense Radar...AMDR) when specific threat capabilities were projected to be operational. • Program schedule setting varies in rigor: 1 Up to the interim version of

  14. Panasonic Small Cell Testing for AHPS

    NASA Technical Reports Server (NTRS)

    Pearson, C.; Blackmore, P.; Lain, M.; Walpole, A.; Darcy, Eric

    2006-01-01

    AEA selection and successful Interim Design Review for AHPS proves maturity of small cell approach for very large batteries. Cells show excellent opportunity for battery mass reduction for AHPS and other low cycle applications. Lack of cycle and extended calendar life make EOL battery performance difficult (AHPS 8 year mission). Preliminary design, AEA retained SONY 18650HC cell as baseline: a) Well characterized performance; b) Wealth of safety test data.

  15. Accounting for interim safety monitoring of an adverse event upon termination of a clinical trial.

    PubMed

    Dallas, Michael J

    2008-01-01

    Upon termination of a clinical trial that uses interim evaluations to determine whether the trial can be stopped, a proper statistical analysis must account for the interim evaluations. For example, in a group-sequential design where the efficacy of a treatment regimen is evaluated at interim stages, and the opportunity to stop the trial based on positive efficacy findings exists, the terminal p-value, point estimate, and confidence limits of the outcome of interest must be adjusted to eliminate bias. While it is standard practice to adjust terminal statistical analyses due to opportunities to stop for "positive" findings, adjusting due to opportunities to stop for "negative" findings is also important. Stopping rules for negative findings are particularly useful when monitoring a specific rare serious adverse event in trials designed to show safety with respect to the event. In these settings, establishing conservative stopping rules are appropriate, and therefore accounting for the interim monitoring can have a substantial effect on the final results. Here I present a method to account for interim safety monitoring and illustrate its usefulness. The method is demonstrated to have advantages over methodology that does not account for interim monitoring.

  16. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  17. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  18. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  19. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  20. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  1. 76 FR 4369 - Special Law Enforcement Commissions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Special Law Enforcement Commissions AGENCY... of the Interim Special Law Enforcement Commission Policy, Rules and Procedures, the Interim Special Law Enforcement Commission Protocols and the Interim Domestic Violence Waiver that will be used by the...

  2. 47 CFR 51.715 - Interim transport and termination pricing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim transport and termination pricing. 51... SERVICES (CONTINUED) INTERCONNECTION Reciprocal Compensation for Transport and Termination of Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...

  3. 47 CFR 51.715 - Interim transport and termination pricing.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 3 2011-10-01 2011-10-01 false Interim transport and termination pricing. 51... SERVICES (CONTINUED) INTERCONNECTION Reciprocal Compensation for Transport and Termination of Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...

  4. 33 CFR 385.9 - Implementation principles.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...

  5. 33 CFR 385.9 - Implementation principles.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...

  6. 33 CFR 385.9 - Implementation principles.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...

  7. 33 CFR 385.9 - Implementation principles.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...

  8. 78 FR 55339 - Regulatory Capital Rules: Regulatory Capital, Implementation of Basel III, Capital Adequacy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-10

    ...The Federal Deposit Insurance Corporation (FDIC) is adopting an interim final rule that revises its risk-based and leverage capital requirements for FDIC-supervised institutions. This interim final rule is substantially identical to a joint final rule issued by the Office of the Comptroller of the Currency (OCC) and the Board of Governors of the Federal Reserve System (Federal Reserve) (together, with the FDIC, the agencies). The interim final rule consolidates three separate notices of proposed rulemaking that the agencies jointly published in the Federal Register on August 30, 2012, with selected changes. The interim final rule implements a revised definition of regulatory capital, a new common equity tier 1 minimum capital requirement, a higher minimum tier 1 capital requirement, and, for FDIC-supervised institutions subject to the advanced approaches risk-based capital rules, a supplementary leverage ratio that incorporates a broader set of exposures in the denominator. The interim final rule incorporates these new requirements into the FDIC's prompt corrective action (PCA) framework. In addition, the interim final rule establishes limits on FDIC-supervised institutions' capital distributions and certain discretionary bonus payments if the FDIC-supervised institution does not hold a specified amount of common equity tier 1 capital in addition to the amount necessary to meet its minimum risk-based capital requirements. The interim final rule amends the methodologies for determining risk-weighted assets for all FDIC-supervised institutions. The interim final rule also adopts changes to the FDIC's regulatory capital requirements that meet the requirements of section 171 and section 939A of the Dodd-Frank Wall Street Reform and Consumer Protection Act. The interim final rule also codifies the FDIC's regulatory capital rules, which have previously resided in various appendices to their respective regulations, into a harmonized integrated regulatory framework. In addition, the FDIC is amending the market risk capital rule (market risk rule) to apply to state savings associations. The FDIC is issuing these revisions to its capital regulations as an interim final rule. The FDIC invites comments on the interaction of this rule with other proposed leverage ratio requirements applicable to large, systemically important banking organizations. This interim final rule otherwise contains regulatory text that is identical to the common rule text adopted as a final rule by the Federal Reserve and the OCC. This interim final rule enables the FDIC to proceed on a unified, expedited basis with the other federal banking agencies pending consideration of other issues. Specifically, the FDIC intends to evaluate this interim final rule in the context of the proposed well- capitalized and buffer levels of the supplementary leverage ratio applicable to large, systemically important banking organizations, as described in a separate Notice of Proposed Rulemaking (NPR) published in the Federal Register August 20, 2013. The FDIC is seeking commenters' views on the interaction of this interim final rule with the proposed rule regarding the supplementary leverage ratio for large, systemically important banking organizations.

  9. 42 CFR 417.574 - Interim settlement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Interim settlement. 417.574 Section 417.574 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... PLANS Medicare Payment: Cost Basis § 417.574 Interim settlement. (a) Determination. Within 30 days...

  10. 14 CFR 136.41 - Interim operating authority.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Interim operating authority. 136.41 Section 136.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... technology, as appropriate, and (9) Shall allow for modifications of the interim operating authority based on...

  11. 14 CFR 136.41 - Interim operating authority.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Interim operating authority. 136.41 Section 136.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... technology, as appropriate, and (9) Shall allow for modifications of the interim operating authority based on...

  12. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...

  13. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...

  14. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 4 2013-10-01 2013-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...

  15. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 4 2014-10-01 2014-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...

  16. 10 CFR 590.403 - Emergency interim orders.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... DEPARTMENT OF ENERGY (CONTINUED) NATURAL GAS (ECONOMIC REGULATORY ADMINISTRATION) ADMINISTRATIVE PROCEDURES WITH RESPECT TO THE IMPORT AND EXPORT OF NATURAL GAS Opinions and Orders § 590.403 Emergency interim... and issue an emergency interim order authorizing the import or export of natural gas. After issuance...

  17. EPA Interim Evaluation of 2016-2017 Milestone Progress in the Chesapeake Bay Watershed

    EPA Pesticide Factsheets

    This page provides the EPA interim evaluations of the 2016-2017 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2016-2017 milestones, recognizing the achievements made in 2016.

  18. EPA Interim Evaluation of 2012-2013 Milestone Progress in the Chesapeake Bay Watershed

    EPA Pesticide Factsheets

    This page provides the EPA interim evaluations of the 2012-2013 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2012-2013 milestones, recognizing the achievements made in 2012.

  19. 49 CFR 37.193 - Interim service requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Interim service requirements. 37.193 Section 37.193 Transportation Office of the Secretary of Transportation TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.193 Interim service requirements. (a) Until...

  20. 76 FR 57657 - Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ...] Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: This regulation establishes an extension of time-limited interim..., and Cosmetic Act (FFDCA). The time-limited tolerances expire on March 18, 2013. DATES: This regulation...

  1. EPA Interim Evaluation of 2014-2015 Milestone Progress in the Chesapeake Bay Watershed

    EPA Pesticide Factsheets

    This page provides the EPA interim evaluations of the 2014-2015 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2014-2015 milestones, recognizing the achievements made in 2014.

  2. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  3. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  4. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  5. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  6. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  7. An interim prosthesis program for lower limb amputees: comparison of public and private models of service.

    PubMed

    Gordon, Robert; Magee, Christopher; Frazer, Anna; Evans, Craig; McCosker, Kathryn

    2010-06-01

    This study compared the outcomes of an interim mechanical prosthesis program for lower limb amputees operated under a public and private model of service. Over a two-year period, 60 transtibial amputees were fitted with an interim prosthesis as part of their early amputee care. Thirty-four patients received early amputee care under a public model of service, whereby a prosthetist was employed to provide the interim mechanical prosthesis service. The remaining 26 patients received early amputee care under a private model of service, where an external company was contracted to provide the interim mechanical prosthesis service. The results suggested comparable clinical outcomes between the two patient groups. However, the public model appeared to be less expensive with the average labour cost per patient being 29.0% lower compared with the private model. The results suggest that a public model of service may provide a more comprehensive and less expensive interim prosthesis program for lower limb amputees.

  8. Average ozone vertical distribution at Sodankyla based on the 1988-1991 ozone sounding data

    NASA Technical Reports Server (NTRS)

    Kyro, Esko; Rummukainen, Markku; Taalas, Petteri; Supperi, Ari

    1994-01-01

    The study presents the statistical analysis of ozone sonde data obtained at Sodankyla (67.4 deg N, 26.6 deg E) from the beginning of the sounding program on March 1988 to the end of December 1991. The Sodankyla sounding data offers the longest continuous record of the ozone vertical distribution in the European Arctic. In this paper, we present the average ozone partial pressures within each 1 km column obtained for different seasons during the almost four year long period. We believe that the data represented here are useful as an interim reference ozone atmosphere, especially considering the fact that northern Scandinavia has become a popular campaign site for the big international ozone experiments.

  9. 78 FR 14487 - Tetrachlorvinphos; Proposed Extension of Time-Limited Interim Pesticide Tolerances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-06

    ...] Tetrachlorvinphos; Proposed Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: This regulation proposes the extension of the time-limited... related to EPA's extension of the time-limited interim tolerances for the combined residues of the...

  10. 78 FR 15880 - Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-13

    ... Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: This regulation extends the time-limited interim tolerances for the... . II. Background A detailed summary of the background related to EPA's extension of the time-limited...

  11. 24 CFR 115.207 - Consequences of interim certification and certification.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Consequences of interim certification and certification. 115.207 Section 115.207 Housing and Urban Development Regulations Relating to... ENFORCEMENT AGENCIES Certification of Substantially Equivalent Agencies § 115.207 Consequences of interim...

  12. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 8 2014-10-01 2014-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  13. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 8 2013-10-01 2013-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  14. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 8 2011-10-01 2011-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  15. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  16. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 8 2012-10-01 2012-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  17. 76 FR 74834 - Interim Staff Guidance on Aging Management Program for Steam Generators

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... NRC staff's evaluation of the suitability of using Revision 3 of the Nuclear Energy Institute's (NEI... NUCLEAR REGULATORY COMMISSION [NRC-2011-0228] Interim Staff Guidance on Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION: Interim staff guidance; issuance...

  18. 78 FR 20503 - Energy Conservation Program: Availability of the Interim Technical Support Document for High...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-05

    ... Conservation Program: Availability of the Interim Technical Support Document for High-Intensity Discharge Lamps... high-intensity discharge (HID) lamps energy conservation standards in the Federal Register. This... interim analysis for high- intensity discharge lamps energy conservation standards. The notice provided...

  19. Is balance performance reduced after mild traumatic brain injury?: Interim analysis from chronic effects of neurotrauma consortium (CENC) multi-centre study.

    PubMed

    Walker, William C; Nowak, Kayla J; Kenney, Kimbra; Franke, Laura Manning; Eapen, Blessen C; Skop, Karen; Levin, Harvey; Agyemang, Amma A; Tate, David F; Wilde, Elisabeth A; Hinds, Sidney; Nolen, Tracy L

    2018-06-12

    Determine if mild traumatic brain injury (mTBI) history is associated with balance disturbances. Chronic Effects of Neurotrauma Consortium (CENC) centres. The CENC multi-centre study enrols post-9/11 era Service Members and Veterans with combat exposure. This sample (n = 322) consisted of enrolees completing initial evaluation by September 2016 at the three sites conducting computerized dynamic post-urography (CDP) testing. Observational study with cross-sectional analyses using structural equation modelling. Comprehensive structured interviews were used to diagnose all lifetime mild traumatic brain injuries (mTBIs). The outcome, Sensory Organization Test (SOT), was measured on CDP dual-plate force platform. Other studied variables were measured by structured interviews, record review and questionnaires. The overall positive/negative mTBI classification did not have a significant effect on the composite equilibrium score. However, the repetitive mTBI classification showed lower scores for participants with ≥ 3 mTBI versus 1-2 lifetime mTBIs. For repetitive mTBI, pain interference acted as a mediator for the indirect effect, and a direct effect was evident on some sensory condition equilibrium scores. These findings show that repeated mTBI, partially mediated by pain, may lead to later balance disturbances among military combatants. Further study of CDP outcomes within this accruing cohort is warranted.

  20. Pregabalin monotherapy in patients with partial-onset seizures

    PubMed Central

    Kwan, Patrick; Fakhoury, Toufic; Pitman, Verne; DuBrava, Sarah; Knapp, Lloyd; Yurkewicz, Lorraine

    2014-01-01

    Objective: To assess pregabalin monotherapy for partial-onset seizures using a historical-controlled conversion-to-monotherapy design. Methods: Adults with inadequately controlled partial-onset seizures while receiving 1 or 2 antiepileptic drugs during an 8-week prospective baseline were randomized to double-blind monotherapy with pregabalin 600 or 150 mg/d (4:1) for 20 weeks (8-week conversion and 12-week monotherapy period). The primary endpoint was the seizure-related exit rate for pregabalin 600 mg/d, based on discontinuations due to predefined criteria. Efficacy was declared if the upper limit of the 95% confidence interval for the exit rate was below a historical-control threshold of 74%, with stepwise evaluation using a threshold of 68%. Results: The trial was stopped early for positive efficacy after an interim analysis in 125 patients. The full study population included 161 patients, with 148 evaluable for efficacy. The mean time since epilepsy diagnosis was 14 years. Overall, 54.3% (600 mg/d) and 46.9% (150 mg/d) of patients completed 20 weeks of double-blind treatment. Seizure-related exit rate in the 600 mg/d group (27.5%; 95% confidence interval, 17.8%–37.2%) was significantly below the 74% and 68% thresholds (p < 0.001 for both). Eight patients on 600 mg/d and 2 on 150 mg/d were seizure-free throughout pregabalin monotherapy. Pregabalin's overall safety profile was consistent with prior trials. Conclusions: Pregabalin monotherapy was safe and efficacious for patients with inadequately controlled partial-onset seizures. Classification of evidence: This study provides Class III evidence that patients with inadequately controlled partial-onset seizures switched to pregabalin monotherapy have fewer seizure-related exit events compared with historical controls switched to pseudo-placebo monotherapy. PMID:24415567

  1. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  2. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  3. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  4. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  5. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  6. 75 FR 13484 - Foreign-Trade Zone 22; Temporary/Interim Manufacturing Authority; LG Electronics Mobilecomm USA...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-22

    ... DEPARTMENT OF COMMERCE [Docket T-1-2010] Foreign-Trade Zones Board Foreign-Trade Zone 22; Temporary/Interim Manufacturing Authority; LG Electronics Mobilecomm USA, Inc. (Cell Phones); Notice of.../ interim manufacturing (T/IM) authority, on behalf of LG Electronics Mobilecomm USA, Inc. (LGEMU), to...

  7. 76 FR 37781 - Foreign-Trade Zone 26; Atlanta, GA; Application for Temporary/Interim Manufacturing Authority...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-28

    ..., GA; Application for Temporary/ Interim Manufacturing Authority; Makita Corporation of America; (Hand- Held Power Tool and Gasoline/Electric-Powered Garden Product Manufacturing); Buford, GA An application... Georgia Foreign-Trade Zone, Inc., grantee of FTZ 26, requesting temporary/interim manufacturing (T/IM...

  8. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bradley, J.

    2002-06-18

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process.

  9. The Intentional Interim

    ERIC Educational Resources Information Center

    Nugent, Patricia A.

    2011-01-01

    The author spent years in central-office administration, most recently in an interim position. Some interim administrators simply see themselves as placeholders until the real deal is hired, giving the organization the opportunity to coast. There are others who see themselves as change agents and cannot wait to undo or redo what their predecessor…

  10. Presidential Transition: The Experience of Two Community College Interim Presidents

    ERIC Educational Resources Information Center

    Thompson, Matthew D.

    2010-01-01

    The purpose of this qualitative case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions following an abrupt presidential departure. There were two fundamental questions framing this research study, 1. How do two interim community college presidents lead…

  11. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The... test operation pursuant to § 73.1620, may commence interim hybrid IBOC DAB operation with digital... No. 99-325. FM stations are permitted to operate with hybrid digital effective radiated power equal...

  12. 77 FR 55232 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-03; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0067] Japan Lessons-Learned Project Directorate Interim...-Learned Project Directorate Interim Staff Guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate (JLD...

  13. 78 FR 40199 - Draft Spent Fuel Storage and Transportation Interim Staff Guidance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-03

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0140] Draft Spent Fuel Storage and Transportation Interim... Spent Fuel Storage and Transportation Interim Staff Guidance No. 24 (SFST-ISG-24), Revision 0, ``The Use of a Demonstration Program as Confirmation of Integrity for Continued Storage of High Burnup Fuel...

  14. 75 FR 66553 - Truth in Lending

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-28

    ... AGENCY: Board of Governors of the Federal Reserve System. ACTION: Interim final rule; request for public comment. SUMMARY: The Board is publishing for public comment an interim final rule amending Regulation Z (Truth in Lending). The interim rule implements Section 129E of the Truth in Lending Act (TILA), which...

  15. Staff Reactions to Interim Leadership in a Student Affairs Organization

    ERIC Educational Resources Information Center

    Jones, Robin D.

    2011-01-01

    Interim leadership appointments in higher education are a common strategy used to fill leadership gaps in executive positions. Because student affairs executives are particularly vulnerable to high turnover rates, interim appointments are becoming more widespread. Even with the prevalence of this trend, little attention has been given to the…

  16. Faculty and Student Views of the Interim Term

    ERIC Educational Resources Information Center

    Centra, John A.; Sobol, Marion G.

    1974-01-01

    Evaluations of the interim term or 4-1-4 program at various colleges have been generally favorable. A detailed evaluation of the Rider College interim study program based on faculty and student reports indicated that the more nontraditionally oriented courses were rated higher than the more traditional offerings. (Editor/PG)

  17. 12 CFR 541.18 - Interim Federal savings association.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... an existing savings and loan holding company or to facilitate any other transaction the Office may... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interim Federal savings association. 541.18... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.18 Interim Federal savings association. The term...

  18. 15 CFR 904.322 - Interim action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine resources during the pendency of an action under this subpart, in cases of willfulness, or as otherwise...

  19. 15 CFR 904.322 - Interim action.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine resources during the pendency of an action under this subpart, in cases of willfulness, or as otherwise...

  20. Into the Sunset: Reflections of an Interim Administrator.

    ERIC Educational Resources Information Center

    Marlowe, John

    2000-01-01

    One advantage to an interim administrative position is that the public cuts short-timers a little slack. Temporary administrators can learn on the job and become experts on specialized subjects. Personnel issues demand more time than interims possess. Such positions usually do not turn into long-term contracts. (MLH)

  1. PCoD Lite - Using an Interim PCoD Protocol to Assess the Effects of Disturbance Associated with US Navy Exercises on Marine Mammal Populations

    DTIC Science & Technology

    2015-09-30

    1 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. PCoD Lite - Using an Interim PCoD Protocol to Assess...US National Research Council (NRC 2005). Here, we provide an insight into how the Interim PCoD approach (Harwood et al. 2014, King et al. 2015...illustrate how the interim PCoD protocol can be used to inform the process of determining whether or not Navy activities are likely to have an impact on

  2. Exploring the Universe with TV Remotes: Cooperative Quizzes via the Classroom Performance System (CPS) in AY101

    NASA Astrophysics Data System (ADS)

    Byrd, G.; Coleman, S.; Werneth, C.

    2003-12-01

    Our AY101 course has large enrollments. There are the usual attendance problems with students putting off studying until just before major exams, with predictable consequences. We (myself, faculty, Werneth, grad student, and Coleman, undergrad) describe our experience with one strategy to actively involve students: cooperatively answering quiz questions. We tried a solution during our May 2002 Interim term. Classes of three hours/day over three weeks make mid-class breaks essential! Before breaks, we presented a short multiple choice, open book/note quiz answered after break. Quizzes could increase grades, e.g. A- to an A, without excessively diluting importance of closed-book major exams. Comparing Interim 2002 final exams to Interim 2001, the average was 80%, much better than the 2001 class's 57%. The 2002 students interacted with one another more. Attendance was over 90%. During a regular semester, handing out and taking up papers would take up much time during the more frequent and larger classes. It's more interesting if students vote for different answers together then revealing the correct answer. Toward these ends, I obtained a grant for a "Classroom Performance System," a computer receiver unit, 128 ``TV remote" response pads and software for creating quizzes. Spring 2003, three teachers tried out the system in a trial fashion. To compare, we used the system during Interim 2003. Ease of giving quizzes and grading permitted a shorter 5 question quiz during break with another at class end totaling of 27 quizzes (almost one/day for a regular semester's Tuesday/Thursday class). Improvement was maintained with a slight 3 % increase. We used the CPS for events such as the recent Mars close approach. Kids of all ages like to check their understanding with a few questions. We created a web site where the students can interactively review questions and other materials, http://ay101.garnetsigma.com/index.html

  3. The Homestake Interim Laboratory and Homestake DUSEL

    NASA Astrophysics Data System (ADS)

    Lesko, Kevin T.

    2011-12-01

    The former Homestake gold mine in Lead South Dakota is proposed for the National Science Foundation's Deep Underground Science and Engineering Laboratory (DUSEL). The gold mine provides expedient access to depths in excess of 8000 feet below the surface (>7000 mwe). Homestake's long history of promoting scientific endeavours includes the Davis Solar Neutrino Experiment, a chlorine-based experiment that was hosted at the 4850 Level for more than 30 years. As DUSEL, Homestake would be uncompromised by competition with mining interests or other shared uses. The facility's 600-km of drifts would be available for conversion for scientific and educational uses. The State of South Dakota, under Governor Rounds' leadership, has demonstrated exceptionally strong support for Homestake and the creation of DUSEL. The State has provided funding totalling $46M for the preservation of the site for DUSEL and for the conversion and operation of the Homestake Interim Laboratory. Motivated by the strong educational and outreach potential of Homestake, the State contracted a Conversion Plan by world-recognized mine-engineering contractor to define the process of rehabilitating the facility, establishing the appropriate safety program, and regaining access to the facility. The State of South Dakota has established the South Dakota Science and Technology Authority to oversee the transfer of the Homestake property to the State and the rehabilitation and preservation of the facility. The Homestake Scientific Collaboration and the State of South Dakota's Science and Technology Authority has called for Letters of Interest from scientific, educational and engineering collaborations and institutions that are interested in hosting experiments and uses in the Homestake Interim Facility in advance of the NSF's DUSEL, to define experiments starting as early as 2007. The Homestake Program Advisory Committee has reviewed these Letters and their initial report has been released. Options for developing the Homestake Interim Laboratory and evolving this facility into DUSEL are presented.

  4. Alternative Models for Individualized Armor Training. Part I. Interim Report: Review and Analysis of the Literature

    DTIC Science & Technology

    1980-01-01

    for an individualized instructional con- text is provided by Giordono (1975), in his discussion of the design of a " non - lockstep educational system...state of ATI research, sum- marized the methodological and theoretical problems that may have inhibited the application of ATI findings to the design ...years. In contrast, systematic modifications based on results obtained through the application of appropriate experimental designs are desired and

  5. 2016 Lake Michigan Lake Trout Working Group Report

    USGS Publications Warehouse

    Madenjian, Charles P.; Breidert, Brian; Boyarski, David; Bronte, Charles R.; Dickinson, Ben; Donner, Kevin; Ebener, Mark P.; Gordon, Roger; Hanson, Dale; Holey, Mark; Janssen, John; Jonas, Jory; Kornis, Matthew; Olsen, Erik; Robillard, Steve; Treska, Ted; Weldon, Barry; Wright, Greg D.

    2017-01-01

    This report provides a review on the progression of lake trout rehabilitation towards meeting the Salmonine Fish Community Objectives (FCOs) for Lake Michigan (Eshenroder et. al. 1995) and the interim goal and evaluation objectives articulated in A Fisheries Management Implementation Strategy for the Rehabilitation of Lake Trout in Lake Michigan (Dexter et al. 2011); we also include data describing lake trout stocking and mortality to portray the present state of progress towards lake trout rehabilitation.

  6. A review of underwater acoustic systems and methods for locating objects lost at sea

    NASA Technical Reports Server (NTRS)

    Lovelady, R. W.; Ferguson, R. L.

    1983-01-01

    Information related to the location of objects lost at sea is presented. Acoustic devices attached to an object prior to being transported is recommended as a homing beacon. Minimum requirements and some environmental constraints are defined. Methods and procedures for search and recovery are also discussed. Both an interim system and a more advanced system are outlined. Controlled acoustic emission to enhance security is the theme followed.

  7. Interim Report on Scientific Basis for Paint Stripping: Mechanism of Methylene Chloride Based Paint Removers

    DTIC Science & Technology

    2010-10-18

    Methylene Chloride Based Paint Removers October 18, 2010 Approved for public release; distribution is unlimited. James H. Wynne Materials Chemistry...ANSI Std. Z39.18 Public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing...Washington, DC 20375-5320 NRL/MR/6120--10-9303 SERDP WP-1682 Approved for public release; distribution is unlimited. Unclassified Unclassified

  8. 836: Developing a Cooperative Communication System for Safe, Effective, and Efficient Patient Care

    DTIC Science & Technology

    2014-01-01

    since tool institution. There was an average rate of 40 positive sepsis identification tool (SIT) triggers per 1000 patient days. In a 6 month...period 28% of patients with a positive SIT had sepsis and 6% had severe sepsis. Interim review showed 67% received first fluid bolus within 20 minutes...for ulcer prevention, including changing the practice of positioning mechanically ventilated and sedated patients , rethinking the use of extended

  9. 75 FR 7591 - Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-22

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-SFUND-2009-0907; FRL-9114-6] RIN 2050-ZA05 Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites; Extension of... Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response...

  10. Do Interim Assessments Reduce the Race and SES Achievement Gaps?

    ERIC Educational Resources Information Center

    Konstantopoulos, Spyros; Li, Wei; Miller, Shazia R.; van der Ploeg, Arie

    2017-01-01

    The authors examined differential effects of interim assessments on minority and low socioeconomic status students' achievement in Grades K-6. They conducted a large-scale cluster randomized experiment in 2009-2010 to evaluate the impact of Indiana's policy initiative introducing interim assessments statewide. The authors used 2-level models to…

  11. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  12. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 31 Money and Finance: Treasury 1 2014-07-01 2014-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  13. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  14. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  15. 75 FR 54526 - Defense Federal Acquisition Regulation Supplement; Payment of Costs Prior to Definitization...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-08

    ... in 48 CFR Part 217 Government procurement. Ynette R. Shelkin, Editor, Defense Acquisition Regulations...). ACTION: Final rule. SUMMARY: DoD is adopting as final, without change, an interim rule amending the... interim rule. Therefore, DoD is finalizing the interim rule without change. This rule was not subject to...

  16. 76 FR 43260 - Foreign-Trade Zone 72-Indianapolis, IN; Application for Temporary/Interim Manufacturing Authority...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ...--Indianapolis, IN; Application for Temporary/Interim Manufacturing Authority; Brevini Wind USA, Inc. (Wind... temporary/interim manufacturing (T/IM) authority within FTZ 72 at the Brevini Wind USA, Inc. (Brevini... requested authority to produce wind turbine gear boxes (HTSUS 8483.40, duty rate: 2.5%). Foreign components...

  17. 75 FR 60436 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-30

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it is releasing an interim...

  18. 75 FR 24667 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it released an interim change...

  19. 75 FR 10476 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-08

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it released an interim change...

  20. 76 FR 776 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-06

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it is releasing an interim...

  1. 75 FR 15420 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it will release an interim...

  2. 76 FR 59119 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-23

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it has released an interim...

  3. Can Interim Assessments Be Used for Instructional Change? Policy Brief. RB-51

    ERIC Educational Resources Information Center

    Goertz, Margaret E.; Olah, Leslie Nabors; Riggan, Matthew

    2009-01-01

    The purpose of this exploratory study was to examine the use of interim assessments and the policy supports that promote their use to change instruction, focusing on elementary school mathematics. The authors use the term "interim assessments" to refer to assessments that: a) evaluate student knowledge and skills, typically within a…

  4. 40 CFR Appendix III to Part 265 - EPA Interim Primary Drinking Water Standards

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... 40 Protection of Environment 26 2011-07-01 2011-07-01 false EPA Interim Primary Drinking Water... Water Standards Parameter Maximum level (mg/l) Arsenic 0.05 Barium 1.0 Cadmium 0.01 Chromium 0.05...

  5. 40 CFR Appendix III to Part 265 - EPA Interim Primary Drinking Water Standards

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... 40 Protection of Environment 25 2010-07-01 2010-07-01 false EPA Interim Primary Drinking Water... Water Standards Parameter Maximum level (mg/l) Arsenic 0.05 Barium 1.0 Cadmium 0.01 Chromium 0.05...

  6. 33 CFR 96.360 - Interim Safety Management Certificate: what is it and when can it be used?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... section, when— (1) The company's valid Document of Compliance certificate or Interim Document of Compliance certificate applies to that vessel type; (2) The company's safety management system for the vessel... to the responsible person or their company. (b) An Interim Safety Management Certificate is valid for...

  7. 76 FR 15028 - Airport Improvement Program (AIP): Interim Policy Regarding Access to Airports From Residential...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-18

    ... resolution. The goal of the interim policy is to strike a careful balance by accommodating residential... will allow the agency to complete a separate, ongoing general aviation airport study that is analyzing the federally assisted general aviation airport system. The interim policy adopts the changes proposed...

  8. 42 CFR 417.572 - Budget and enrollment forecast and interim reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Budget and enrollment forecast and interim reports... PLANS, AND HEALTH CARE PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.572 Budget and enrollment forecast and interim reports. (a) Annual submittal. The HMO or CMP must submit an annual operating budget...

  9. 78 FR 5830 - Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ... Operations of PacifiCorp's Klamath Hydroelectric Project on the Klamath River, Klamath County, OR, and... Environmental Policy Act (NEPA) for the interim operations of the Klamath Hydroelectric Project in [[Page 5831... habitats upon which they depend, resulting from the interim operations of the Klamath Hydroelectric Project...

  10. 40 CFR Appendix III to Part 265 - EPA Interim Primary Drinking Water Standards

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false EPA Interim Primary Drinking Water Standards III Appendix III to Part 265 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Pt....

  11. 46 CFR 308.6 - Period of interim binders, updating application information and new applications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...

  12. 46 CFR 308.6 - Period of interim binders, updating application information and new applications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...

  13. 46 CFR 308.6 - Period of interim binders, updating application information and new applications.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...

  14. 46 CFR 308.6 - Period of interim binders, updating application information and new applications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...

  15. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  16. Leadership trends in academic pediatric departments.

    PubMed

    Stapleton, F Bruder; Jones, Douglas; Fiser, Debra H

    2005-08-01

    To examine recent turnover trends among chairs of academic pediatric departments. Membership data for the 150 institutions represented by the Association of Medical School Pediatric Department Chairs in the United States, Canada, and Puerto Rico were reviewed for the time period of 1993-2003. From 1993 to 2003, 278 individuals (250 men and 28 women) held the position of chair. The mean time of service was 5.58 +/- 3.2 years (median: 5 years). Twenty-nine individuals served continuously as chairs during the 11-year period. Seventy-two individuals served as interim chairs. Twenty-eight women were appointed either chairs or interim chairs during the 11 years. The number of female chairs decreased from 13 in 1993 to 11 in 2003. Female chairs were in office 3.42 +/- 2.72 years. A total of 123 departments had a change in leadership, with a mean annual turnover rate of 17% (range: 4.6-24%). Three departments had 5 different leaders as either interim chair or chair and 6 departments had 4 different leaders during this time period. Neonatology was the most common subspecialty represented by recent pediatric chairs, although nephrology was the subspecialty with the greatest proportional representation. Departments of pediatrics have high turnover of leadership. Women, in particular, serve for relatively short periods and appear to be under-represented within the leadership of pediatrics. Efforts should be made to ascertain personal qualities that allow sustained leadership and to attract more women into leadership positions.

  17. Addressing the Challenge of Molecular Change: An Interim Report

    NASA Astrophysics Data System (ADS)

    Levine, Raphael D.

    2018-04-01

    Invited by the editorial committee of the Annual Review of Physical Chemistry to "contribute my autobiography," I present it here, as I understand the term. It is about my parents, my mentors, my coworkers, and my friends in learning and the scientific problems that we tried to address. Courtesy of the editorial assistance of Annual Reviews, some of the science is in the figure captions and sidebars. I am by no means done: I am currently trying to fuse the quantitative rigor of physical chemistry with systems biology while also dealing with a post-Born-Oppenheimer regime in electronic dynamics and am attempting to instruct molecules to perform advanced logic.

  18. Decision-making in the management of adult classical Hodgkin's lymphoma: determining the optimal treatment.

    PubMed

    Mounier, Nicolas; Nicolas, Mounier; Gisselbrecht, Christian; Christian, Gisselbrecht

    2015-04-01

    This review discusses promising new approaches in classical Hodgkin's lymphoma that have been recently evaluated. There is a focus on the fluorodeoxyglucose PET scanning that is now considered crucial for staging and treatment evaluation, including interim evaluation after two cycles. An up-front treatment strategy is discussed, with the place of radiation therapy and the difficult choice of chemotherapy intensity emphasized. Indications for frail patients are also reviewed, particularly elderly or HIV-positive patients. Emerging data on the antibody drug conjugate brentuximab vedotin and its future potential in the transplantation framework for relapsed/refractory Hodgkin's lymphoma is also discussed.

  19. Addressing the Challenge of Molecular Change: An Interim Report.

    PubMed

    Levine, Raphael D

    2018-04-20

    Invited by the editorial committee of the Annual Review of Physical Chemistry to "contribute my autobiography," I present it here, as I understand the term. It is about my parents, my mentors, my coworkers, and my friends in learning and the scientific problems that we tried to address. Courtesy of the editorial assistance of Annual Reviews, some of the science is in the figure captions and sidebars. I am by no means done: I am currently trying to fuse the quantitative rigor of physical chemistry with systems biology while also dealing with a post-Born-Oppenheimer regime in electronic dynamics and am attempting to instruct molecules to perform advanced logic.

  20. Preformed posterior stainless steel crowns: an update.

    PubMed

    Croll, T P

    1999-02-01

    For almost 50 years, dentists have used stainless steel crowns for primary and permanent posterior teeth. No other type of restoration offers the convenience, low cost, durability, and reliability of such crowns when interim full-coronal coverage is required. Preformed stainless steel crowns have improved over the years. Better luting cements have been developed and different methods of crown manipulation have evolved. This article reviews stainless steel crown procedures for primary and permanent posterior teeth. Step-by-step placement of a primary molar stainless steel crown is documented and permanent molar stainless steel crown restoration is described. A method for repairing a worn-through crown also is reviewed.

  1. A Conservative Method of Retaining an Interim Obturator for a Total Maxillectomy Patient

    PubMed Central

    Bettie, Nirmal Famila

    2017-01-01

    Interim obturators are indicated during the postsurgical phases. It promotes surgical healing and serves as a temporary prosthesis to rehabilitate a patient with intra-oral surgical defect. Retention is gained by wiring, surgical suturing, and other noninvasive methods to enable functional rehabilitation and easy replacement with a permanent obturator. Interim obturators serve as an easy guide for replacing with definitive obturators by indicating prosthesis extensions and the required method of retention. A more conservative and noninvasive method of retaining an interim obturator for a maxillectomy patient is described in this case report. PMID:29284985

  2. A Conservative Method of Retaining an Interim Obturator for a Total Maxillectomy Patient.

    PubMed

    Bettie, Nirmal Famila

    2017-11-01

    Interim obturators are indicated during the postsurgical phases. It promotes surgical healing and serves as a temporary prosthesis to rehabilitate a patient with intra-oral surgical defect. Retention is gained by wiring, surgical suturing, and other noninvasive methods to enable functional rehabilitation and easy replacement with a permanent obturator. Interim obturators serve as an easy guide for replacing with definitive obturators by indicating prosthesis extensions and the required method of retention. A more conservative and noninvasive method of retaining an interim obturator for a maxillectomy patient is described in this case report.

  3. Partial Edentulism and its Correlation to Age, Gender, Socio-economic Status and Incidence of Various Kennedy’s Classes– A Literature Review

    PubMed Central

    Krishnan, Chitra Shankar

    2015-01-01

    Partial edentulism, one or more teeth missing is an indication of healthy behaviour of dental practices in the society and attitude towards dental and oral care. The pattern of partial edentulism has been evaluated in many selected populations in different countries by different methods. Most of the studies have evaluated partial edentulism by surveying of Removable Partial Dentures (RPDs), patients visiting clinics, clinical records and population in particular locality. The objective of the study is to review the prevalence of partial edentulousness and its correlation to age,gender, arch predominance, socio economic factors and incidence of various Kennedy’s Classes. Key observations drawn from the review are as below. There is no gender correlation for partial edentulism.Prevalence of partial edentulism is more common in mandibular arch than maxillary arch.Younger adults have more Class III and IV RPDs. Elders have more distal extension RPDs Class I and II. PMID:26266237

  4. Partial Edentulism and its Correlation to Age, Gender, Socio-economic Status and Incidence of Various Kennedy's Classes- A Literature Review.

    PubMed

    Jeyapalan, Vidhya; Krishnan, Chitra Shankar

    2015-06-01

    Partial edentulism, one or more teeth missing is an indication of healthy behaviour of dental practices in the society and attitude towards dental and oral care. The pattern of partial edentulism has been evaluated in many selected populations in different countries by different methods. Most of the studies have evaluated partial edentulism by surveying of Removable Partial Dentures (RPDs), patients visiting clinics, clinical records and population in particular locality. The objective of the study is to review the prevalence of partial edentulousness and its correlation to age,gender, arch predominance, socio economic factors and incidence of various Kennedy's Classes. Key observations drawn from the review are as below. There is no gender correlation for partial edentulism.Prevalence of partial edentulism is more common in mandibular arch than maxillary arch.Younger adults have more Class III and IV RPDs. Elders have more distal extension RPDs Class I and II.

  5. 50 CFR 660.720 - Interim protection for sea turtles.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 50 Wildlife and Fisheries 13 2012-10-01 2012-10-01 false Interim protection for sea turtles. 660... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§ 660.707... harvest of swordfish (Xiphias gladius) using longline gear deployed on the high seas of the Pacific Ocean...

  6. 50 CFR 660.720 - Interim protection for sea turtles.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 50 Wildlife and Fisheries 13 2013-10-01 2013-10-01 false Interim protection for sea turtles. 660... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§ 660.707... harvest of swordfish (Xiphias gladius) using longline gear deployed on the high seas of the Pacific Ocean...

  7. 50 CFR 660.720 - Interim protection for sea turtles.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 50 Wildlife and Fisheries 11 2011-10-01 2011-10-01 false Interim protection for sea turtles. 660... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§ 660.707... harvest of swordfish (Xiphias gladius) using longline gear deployed on the high seas of the Pacific Ocean...

  8. 50 CFR 660.720 - Interim protection for sea turtles.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 50 Wildlife and Fisheries 13 2014-10-01 2014-10-01 false Interim protection for sea turtles. 660... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§ 660.707... harvest of swordfish (Xiphias gladius) using longline gear deployed on the high seas of the Pacific Ocean...

  9. 49 CFR 37.169 - Interim requirements for over-the-road bus service operated by private entities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Interim requirements for over-the-road bus service... Interim requirements for over-the-road bus service operated by private entities. (a) Private entities operating over-the-road buses, in addition to compliance with other applicable provisions of this part...

  10. 76 FR 48197 - Self-Regulatory Organizations; Municipal Securities Rulemaking Board; Notice of Filing of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-08

    ... assessable professional reported or required to be reported by a municipal advisor to the MSRB on Form A-11... Assessment and Form A-11- Interim. For purposes of the interim assessment, an assessable professional of a...-Interim as an assessable professional any associated person (i) Who otherwise qualifies as an assessable...

  11. 75 FR 12217 - Notice of Availability for Comments Regarding the Planned Environmental Assessment Interim Report...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-15

    ... public comments for a planned Environmental Assessment. The Corps is directed to conduct a study of.... The study is structured as a series of interim reports. Interim Report IIIa, limited to the impacts of.... Comments are requested to assist in determining the level of analysis and impacts to be considered for...

  12. 78 FR 53038 - Interim Final Determination to Stay and Defer Sanctions; California; San Joaquin Valley

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2013-0534; FRL-9900-36-Region 9.... Environmental Protection Agency (EPA). ACTION: Interim final rule. SUMMARY: EPA is making an interim [email protected] . Mail or deliver: Frances Wicher (AIR-2), U.S. Environmental Protection Agency Region 9...

  13. Review of the transport of selected radionuclides in the interim risk assessment for the Radioactive Waste Management Complex, Waste Area Group 7 Operable Unit 7-13/14, Idaho National Engineering and Environmental Laboratory, Idaho

    USGS Publications Warehouse

    Rousseau, Joseph P.; Landa, Edward R.; Nimmo, John R.; Cecil, L. DeWayne; Knobel, LeRoy L.; Glynn, Pierre D.; Kwicklis, Edward M.; Curtis, Gary P.; Stollenwerk, Kenneth G.; Anderson, Steven R.; Bartholomay, Roy C.; Bossong, Clifford R.; Orr, Brennon R.

    2005-01-01

    The U.S. Department of Energy (DOE) requested that the U.S. Geological Survey conduct an independent technical review of the Interim Risk Assessment (IRA) and Contaminant Screening for the Waste Area Group 7 (WAG-7) Remedial Investigation, the draft Addendum to the Work Plan for Operable Unit 7-13/14 WAG-7 comprehensive Remedial Investigation and Feasibility Study (RI/FS), and supporting documents that were prepared by Lockheed Martin Idaho Technologies, Inc. The purpose of the technical review was to assess the data and geotechnical approaches that were used to estimate future risks associated with the release of the actinides americium, uranium, neptunium, and plutonium to the Snake River Plain aquifer from wastes buried in pits and trenches at the Subsurface Disposal Area (SDA). The SDA is located at the Radioactive Waste Management Complex in southeastern Idaho within the boundaries of the Idaho National Engineering and Environmental Laboratory. Radionuclides have been buried in pits and trenches at the SDA since 1957 and 1952, respectively. Burial of transuranic wastes was discontinued in 1982. The five specific tasks associated with this review were defined in a ?Proposed Scope of Work? prepared by the DOE, and a follow-up workshop held in June 1998. The specific tasks were (1) to review the radionuclide sampling data to determine how reliable and significant are the reported radionuclide detections and how reliable is the ongoing sampling program, (2) to assess the physical and chemical processes that logically can be invoked to explain true detections, (3) to determine if distribution coefficients that were used in the IRA are reliable and if they have been applied properly, (4) to determine if transport model predictions are technically sound, and (5) to identify issues needing resolution to determine technical adequacy of the risk assessment analysis, and what additional work is required to resolve those issues.

  14. Evaluation of ERA-Interim precipitation data in complex terrain

    NASA Astrophysics Data System (ADS)

    Gao, Lu; Bernhardt, Matthias; Schulz, Karsten

    2013-04-01

    Precipitation controls a large variety of environmental processes, which is an essential input parameter for land surface models e.g. in hydrology, ecology and climatology. However, rain gauge networks provides the necessary information, are commonly sparse in complex terrains, especially in high mountainous regions. Reanalysis products (e.g. ERA-40 and NCEP-NCAR) as surrogate data are increasing applied in the past years. Although they are improving forward, previous studies showed that these products should be objectively evaluated due to their various uncertainties. In this study, we evaluated the precipitation data from ERA-Interim, which is a latest reanalysis product developed by ECMWF. ERA-Interim daily total precipitation are compared with high resolution gridded observation dataset (E-OBS) at 0.25°×0.25° grids for the period 1979-2010 over central Alps (45.5-48°N, 6.25-11.5°E). Wet or dry day is defined using different threshold values (0.5mm, 1mm, 5mm, 10mm and 20mm). The correspondence ratio (CR) is applied for frequency comparison, which is the ratio of days when precipitation occurs in both ERA-Interim and E-OBS dataset. The result shows that ERA-Interim captures precipitation occurrence very well with a range of CR from 0.80 to 0.97 for 0.5mm to 20mm thresholds. However, the bias of intensity increases with rising thresholds. Mean absolute error (MAE) varies between 4.5 mm day-1 and 9.5 mm day-1 in wet days for whole area. In term of mean annual cycle, ERA-Interim almost has the same standard deviation of the interannual variability of daily precipitation with E-OBS, 1.0 mm day-1. Significant wet biases happened in ERA-Interim throughout warm season (May to August) and dry biases in cold season (November to February). The spatial distribution of mean annual daily precipitation shows that ERA-Interim significant underestimates precipitation intensity in high mountains and northern flank of Alpine chain from November to March while pronounced overestimate in the southern flank of Alps. The poor topographical and flow related characteristic representation of ERA-Interim model is possibly responsible for the bias. Particularly, the mountain block effect of moisture is weak captured. The comparison demonstrates that ERA-Interim precipitation intensity needs bias correction for further alpine climate studies, although it reasonably captures precipitation frequency. This critical evaluation not only diagnosed the data quality of ERA-Interim, but also provided the evidence for reanalysis products downscaling and bias correction in complex terrain.

  15. In vitro evaluation of the marginal integrity of CAD/CAM interim crowns.

    PubMed

    Kelvin Khng, Kwang Yong; Ettinger, Ronald L; Armstrong, Steven R; Lindquist, Terry; Gratton, David G; Qian, Fang

    2016-05-01

    The accuracy of interim crowns made with computer-aided design and computer-aided manufacturing (CAD/CAM) systems has not been well investigated. The purpose of this in vitro study was to evaluate the marginal integrity of interim crowns made by CAD/CAM compared with that of conventional polymethylmethacrylate (PMMA) crowns. A dentoform mandibular left second premolar was prepared for a ceramic crown and scanned for the fabrication of 60 stereolithical resin dies, half of which were scanned to fabricate 15 Telio CAD-CEREC and 15 Paradigm MZ100-E4D-E4D crowns. Fifteen Caulk and 15 Jet interim crowns were made on the remaining resin dies. All crowns were cemented with Tempgrip under a 17.8-N load, thermocycled for 1000 cycles, placed in 0.5% acid fuschin for 24 hours, and embedded in epoxy resin before sectioning from the mid-buccal to mid-lingual surface. The marginal discrepancy was measured using a traveling microscope, and dye penetration was measured as a percentage of the overall length under the crown. The mean vertical marginal discrepancy of the conventionally made interim crowns was greater than for the CAD/CAM crowns (P=.006), while no difference was found for the horizontal component (P=.276). The mean vertical marginal discrepancy at the facial surface of the Caulk crowns was significantly greater than that of the other 3 types of interim crowns (P<.001). At the facial margin, the mean horizontal component of the Telio crowns was significantly larger than that of the other 3 types, with no difference at the lingual margins (P=.150). The mean percentage dye penetration for the Paradigm MZ100-E4D crowns was significantly greater and for Jet crowns significantly smaller than for the other 3 crowns (P<.001). However, the mean percentage dye penetration was significantly correlated with the vertical and horizontal marginal discrepancies of the Jet interim crowns at the facial surface and with the horizontal marginal discrepancies of the Caulk interim crowns at the lingual surface (P<.01 in each instance). A significantly smaller vertical marginal discrepancy was found with the interim crowns fabricated by CAD/CAM as compared with PMMA crowns; however, this difference was not observed for the horizontal component. The percentage dye penetration was correlated with vertical and horizontal discrepancies at the facial surface for the Jet interim crowns and with horizontal discrepancies at the lingual surface for the Caulk interim crowns. Copyright © 2016 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  16. Quantifying the bias in the estimated treatment effect in randomized trials having interim analyses and a rule for early stopping for futility.

    PubMed

    Walter, S D; Han, H; Briel, M; Guyatt, G H

    2017-04-30

    In this paper, we consider the potential bias in the estimated treatment effect obtained from clinical trials, the protocols of which include the possibility of interim analyses and an early termination of the study for reasons of futility. In particular, by considering the conditional power at an interim analysis, we derive analytic expressions for various parameters of interest: (i) the underestimation or overestimation of the treatment effect in studies that stop for futility; (ii) the impact of the interim analyses on the estimation of treatment effect in studies that are completed, i.e. that do not stop for futility; (iii) the overall estimation bias in the estimated treatment effect in a single study with such a stopping rule; and (iv) the probability of stopping at an interim analysis. We evaluate these general expressions numerically for typical trial scenarios. Results show that the parameters of interest depend on a number of factors, including the true underlying treatment effect, the difference that the trial is designed to detect, the study power, the number of planned interim analyses and what assumption is made about future data to be observed after an interim analysis. Because the probability of stopping early is small for many practical situations, the overall bias is often small, but a more serious issue is the potential for substantial underestimation of the treatment effect in studies that actually stop for futility. We also consider these ideas using data from an illustrative trial that did stop for futility at an interim analysis. Copyright © 2017 John Wiley & Sons, Ltd. Copyright © 2017 John Wiley & Sons, Ltd.

  17. A global validation of ERA-Interim integrated water vapor estimates using ground-based GNSS observations

    NASA Astrophysics Data System (ADS)

    Ahmed, F.; Dousa, J.; Hunegnaw, A.; Teferle, F. N.; Bingley, R.

    2017-12-01

    Integrated water vapor (IWV) derived from climate reanalysis models, such as the European Centre for Medium-range Weather Forecasts (ECMWF) ReAnalysis-Interim (ERA-Interim), is widely used in many atmospheric applications. Therefore, it is of interest to assess the quality of this reanalysis product using available observations. Observations from Global Navigation Satellite Systems (GNSS) are, as of now, available for a period of over 2 decades and their global availability makes it possible to validate the IWV obtained from climate reanalysis models in different geographical and climatic regions. In this study, primarily, three 5-year long homogeneously reprocessed GNSS-derived IWV datasets containing over 400 globally distributed ground-based GNSS stations have been used to validate the IWV estimates obtained from the ERA-Interim climate reanalysis model in 25 different climate zones. The IWV from ERA-Interim has been obtained by vertically integrating the specific humidity at all model levels above the locations of GNSS stations. It has been studied how the difference between the ERA-Interim IWV and the GNSS-derived IWV varies with respect to the different climate zones as well as with respect to the difference in the model orography and latitude. The results show a dependence of the ability of ERA-Interim to model the IWV on difference in climate types and latitude. This dependence, however, is dictated by the concentration of water vapor in different climate zones and at different latitudes. Furthermore, as a secondary focus of this study, the weighted mean atmospheric temperature (Tm) obtained from ERA-Interim has been compared to its equivalent obtained using two widely used approximations globally.

  18. Elimination of exemptions for chemical mixtures containing the list I chemicals ephedrine and/or pseudoephedrine. Final rule.

    PubMed

    2008-07-10

    The Drug Enforcement Administration (DEA) is finalizing, without change, the Interim Rule with Request for Comment published in the Federal Register on July 25, 2007 (72 FR 40738). The Interim Rule removed the Controlled Substances Act (CSA) exemptions for chemical mixtures containing ephedrine and/or pseudoephedrine with concentration limits at or below five percent. Upon the effective date of the Interim Rule, all ephedrine and pseudoephedrine chemical mixtures, regardless of concentration and form, became subject to the regulatory provisions of the CSA. DEA regulated the importation, exportation, manufacture, and distribution of these chemical mixtures by requiring persons who handle these chemical mixtures to register with DEA, maintain certain records common to business practice, and file certain reports, regarding these chemical mixtures. No comments to the Interim Rule were received. This Final Rule finalizes the Interim Rule without change.

  19. Sociocultural Behavior Sensemaking: State of the Art in Understanding the Operational Environment

    DTIC Science & Technology

    2014-01-01

    and environmental change have expanded the number and frequency of “game-changing moments” that a community can face. Now more than ever, we need...August 2011: Establishment of the rebel interim government in Tripoli (8/26/ 11 ). This analysis can also be applied to single communication ...information. The Psychological Review, 63, 81–89. Miller, G.A. (1995). WordNet: A lexical database for English. Communications of the ACM 38( 11 ), 39

  20. Translating evidence into practice: pursuing perfection in pneumococcal vaccination in a rural community.

    PubMed

    Doyle, D M; Dauterive, R; Chuang, K H; Ellrodt, A G

    2001-11-01

    There are many challenges to effectively and efficiently translating evidence into practice. Potential strategies include (1) training more evidence-based practitioners in the art and science of evidence-based medicine, (2) enhancing the quality and availability of systematic reviews, and (3) more effectively linking evidence-based practitioners and evidence users through comprehensive behavioral change initiatives. Herein we explore the third strategy and highlight the key elements of success for a program using behavioral change strategies. We present a clinical model based on clear understanding of the "problem," a systematic approach to diagnosis, selection of scientifically sound treatment options, and effective evaluation with appropriate modification of the treatment plan. A successful program begins with effective team leadership, the expression of a clinically compelling case for change, and commitment to the pursuit of perfection in the delivery of key evidence-based interventions. The team must then diagnose behavioral barriers to change, using a systematic approach based on a published rigorous differential diagnosis framework. This diagnostic step provides the foundation for selection of effective dissemination and implementation strategies (treatments) proven to improve processes of care and clinical outcomes. Finally the team must evaluate progress toward perfection, reviewing interim data and adjusting the treatment regimen to newly diagnosed barriers. We then present a specific project (improving pneumococcal immunization rates in our rural community) and interim results to demonstrate the use of the framework in the real world.

  1. Global Spent Fuel Logistics Systems Study (GSFLS). Volume 3A. GSFLS technical analysis (appendix). Interim report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kriger, A.

    1978-01-31

    This report is a part of the interim report documentation for the Global Spent Fuel Logistics System (GSFLS) study. The technical and financial considerations underlying a global spent fuel logistics systems have been studied and are reported. The Pacific Basin is used as a model throughout this report; however the stated methodology and, in many cases, considerations and conclusions are applicable to other global regions. Spent fuel discharge profiles for Pacific Basin Countries were used to determine the technical systems requirements for alternative concepts. Functional analyses and flows were generated to define both system design requirements and logistics parameters. Amore » technology review was made to ascertain the state-of-the-art of relevant GSFLS technical systems. Modular GSFLS facility designs were developed using the information generated from the functional analysis and technology review. The modular facility designs were used as a basis for siting and cost estimates for various GSFLS alternatives. Various GSFLS concepts were analyzed from a financial and economic perspective in order to provide total concepts costs and ascertain financial and economic sensitivities to key GSFLS variations. Results of the study include quantification of GSFLS facility and hardware requirements; drawings of relevant GSFLS facility designs; system cost estimates; financial reports - including user service charges; and comparative analyses of various GSFLS alternatives.« less

  2. Investigations carried out under the Director's Discretionary Fund

    NASA Technical Reports Server (NTRS)

    Chahine, M. T.

    1985-01-01

    This annual report comprises a set of summaries, describing task objectives, progress and results or accomplishments, future outlook, and financial status for each director's discretionary fund (DDF) task that was active during fiscal year 1984. Publications and conference presentations related to the work are listed. The individual reports are categorized as interim or final according to whether the task efforts are ongoing or completed. A partial list of new tasks to be initiated with fiscal year 1985 funds and a glossary of abbreviations and acronyms, used by the task authors in their summaries are included. The table of contents lists the DDF reports in sequence by their task number, which is derived from the 13-digit code assigned to account for the fund awarded to the task project.

  3. 40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the Carbon...

  4. 49 CFR 1152.29 - Prospective use of rights-of-way for interim trail use and rail banking.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Prospective use of rights-of-way for interim trail... Governing Notice, Applications, Financial Assistance, Acquisition for Public Use, and Trail Use § 1152.29 Prospective use of rights-of-way for interim trail use and rail banking. (a) If any state, political...

  5. Temps at the Top: Factors Related to the Appointment of Interim Community College Presidents

    ERIC Educational Resources Information Center

    Goff, Susan L.

    2012-01-01

    The appointment of interim community college presidents, the topic of this study, is a little understood phenomenon. A growing shortage of community college presidents coupled with a lack of replacements suggests the appointment of interims will continue well into the future. This study, with a purpose of looking at the factors related to the…

  6. Office of Inspector General; Medicare and state health care programs: fraud and abuse; issuance of advisory opinions by the OIG. Final rule.

    PubMed

    2008-07-17

    OIG is adopting in final form, without change, an interim final rule published on March 26, 2008 (73 FR 15937). We received no comments to the interim final rule. The interim final rule revised the process for advisory opinion requestors to submit payments for advisory opinion costs.

  7. From Testing to Teaching: The Use of Interim Assessments in Classroom Instruction. CPRE Research Report # RR-65

    ERIC Educational Resources Information Center

    Goertz, Margaret E.; Olah, Leslie Nabors; Riggan, Matthew

    2009-01-01

    The purpose of this exploratory study is to examine the use of interim assessments and the policy supports that promote use to improve instruction, focusing on elementary school mathematics. The authors use the term "interim assessments" to refer to assessments that a) evaluate student knowledge and skills, typically within a limited…

  8. 40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the Carbon...

  9. 40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the Carbon...

  10. 40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the Carbon...

  11. 76 FR 5564 - Grant of Interim Extension of the Term of U.S. Patent No. 4,971,802; MIFAMURTIDE

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-01

    ... DEPARTMENT OF COMMERCE Patent and Trademark Office [Docket No. PTO-P-2011-0001] Grant of Interim... Office, Commerce. ACTION: Notice of interim patent term extension. SUMMARY: The United States Patent and... States Patent and Trademark Office. [FR Doc. 2011-2088 Filed 1-31-11; 8:45 am] BILLING CODE 3510-16-P ...

  12. 47 CFR 51.715 - Interim transport and termination pricing.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... shall set interim transport and termination rates either at the default ceilings specified in § 51.705(c) or in accordance with a bill-and-keep methodology as defined in § 51.713. (3) In a state in which the... minute of use), and transport (as described in § 51.707(b)(2)). (c) An interim arrangement shall cease to...

  13. 47 CFR 51.715 - Interim transport and termination pricing.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... shall set interim transport and termination rates either at the default ceilings specified in § 51.705(c) or in accordance with a bill-and-keep methodology as defined in § 51.713. (3) In a state in which the... minute of use), and transport (as described in § 51.707(b)(2)). (c) An interim arrangement shall cease to...

  14. 47 CFR 51.715 - Interim transport and termination pricing.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... shall set interim transport and termination rates either at the default ceilings specified in § 51.705(c) or in accordance with a bill-and-keep methodology as defined in § 51.713. (3) In a state in which the... minute of use), and transport (as described in § 51.707(b)(2)). (c) An interim arrangement shall cease to...

  15. 77 FR 34399 - Public Housing Assessment System (PHAS): Capital Fund Interim Scoring Notice; Request for Comment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ...-indicator of the Capital Fund indicator to all PHAs for the Capital Fund Indicator under the PHAS interim... transition to the scoring system implemented by the PHAS interim rule, especially as relates to the indicator that assesses occupancy rate. The 5 points for the occupancy sub-indicator will be awarded for fiscal...

  16. Fabrication of an interim complete removable dental prosthesis with an in-office digital light processing three-dimensional printer: A proof-of-concept technique.

    PubMed

    Lin, Wei-Shao; Harris, Bryan T; Pellerito, John; Morton, Dean

    2018-04-30

    This report describes a proof of concept for fabricating an interim complete removable dental prosthesis with a digital light processing 3-dimensional (3D) printer. Although an in-office 3D printer can reduce the overall production cost for an interim complete removable dental prosthesis, the process has not been validated with clinical studies. This report provided a preliminary proof of concept in developing a digital workflow for the in-office additively manufactured interim complete removable dental prosthesis. Copyright © 2018 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  17. National School Lunch Program and School Breakfast Program: Nutrition Standards for All Foods Sold in School as Required by the Healthy, Hunger-Free Kids Act of 2010. Final rule and interim final rule.

    PubMed

    2016-07-29

    This rule adopts as final, with some modifications, the National School Lunch Program and School Breakfast Program regulations set forth in the interim final rule published in the Federal Register on June 28, 2013. The requirements addressed in this rule conform to the provisions in the Healthy, Hunger-Free Kids Act of 2010 regarding nutrition standards for all foods sold in schools, other than food sold under the lunch and breakfast programs. Most provisions of this final rule were implemented on July 1, 2014, a full year subsequent to publication of the interim final rule. This was in compliance with section 208 of the Healthy, Hunger-Free Kids Act of 2010, which required that State and local educational agencies have at least one full school year from the date of publication of the interim final rule to implement the competitive food provisions. Based on comments received on the interim final rule and implementation experience, this final rule makes a few modifications to the nutrition standards for all foods sold in schools implemented on July 1, 2014. In addition, this final rule codifies specific policy guidance issued after publication of the interim rule. Finally, this rule retains the provision related to the standard for total fat as interim and requests further comment on this single standard.

  18. Generation of various partially coherent beams and their propagation properties in turbulent atmosphere: a review

    NASA Astrophysics Data System (ADS)

    Cai, Yangjian

    2011-03-01

    Partially coherent beams, such as Gaussian Schell-model beam, partially coherent dark hollow beam, partially coherent flat-topped beam and electromagnetic Gaussian Schell-model beam, have important applications in free space optical communications, optical imaging, optical trapping, inertial confinement fusion and nonlinear optics. In this paper, experimental generations of various partially coherent beams are introduced. Furthermore, with the help of a tensor method, analytical formulae for such beams propagating in turbulent atmosphere are derived, and the propagation properties of such beams in turbulent atmosphere are reviewed.

  19. Partial sick leave--review of its use, effects and feasibility in the Nordic countries.

    PubMed

    Kausto, Johanna; Miranda, Helena; Martimo, Kari-Pekka; Viikari-Juntura, Eira

    2008-08-01

    Partial sick leave and partial sickness benefits are currently available in Sweden, Norway, Denmark, and Finland. The literature was reviewed to determine their use, describe their recipients, find evidence of their effects, and explore attitudes towards and experiences with their use. Eight databases were searched. National sickness absence statistics and other relevant sources were also reviewed. Of the sickness benefits, partial benefits accounted for approximately one-fifth in Norway, less than 10% in Denmark, and over a third in Sweden. In Finland, partial sick leave was seldom used during the first year (2007) of benefit availability. Few peer-reviewed studies on its effects were identified, and scientific evidence was scarce. Its acceptance was good in all four countries. Most of the recipients were women and over 45 years of age. Studies of its feasibility seem congruent in reporting hindrances due to inflexible work arrangements and poor collaboration between actors. More research and more rigorous study designs are needed to determine whether partial sick leave is feasible and beneficial in keeping those with reduced work ability in worklife.

  20. The Predictive Validity of Interim Assessment Scores Based on the Full-Information Bifactor Model for the Prediction of End-of-Grade Test Performance

    ERIC Educational Resources Information Center

    Immekus, Jason C.; Atitya, Ben

    2016-01-01

    Interim tests are a central component of district-wide assessment systems, yet their technical quality to guide decisions (e.g., instructional) has been repeatedly questioned. In response, the study purpose was to investigate the validity of a series of English Language Arts (ELA) interim assessments in terms of dimensionality and prediction of…

  1. 25 CFR 39.1100 - Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...

  2. 25 CFR 39.1100 - Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...

  3. 25 CFR 39.1100 - Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...

  4. 25 CFR 39.1100 - Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...

  5. 25 CFR 39.1100 - Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...

  6. [Fiber-reinforced composite in fixed prosthodontics].

    PubMed

    Pilo, R; Abu Rass, Z; Shmidt, A

    2010-07-01

    Fiber reinforced composite (FRC) is composed of resin matrix and fibers filler. Common types of fibers: polyethylene, carbon and glass. Fibers can be continuous and aligned, discontinuous and aligned, discontinuous and randomly oriented. The architecture of the fibers is unidirectional, woven or braided. The two main types are: dry fibers or impregnated. Inclusion of fibers to resin composite increased its average flexural strength in 100-200 MPa. FRC can be utilized by the dentist in direct approach (splinting, temporary winged bridge) or indirect approach (laboratory made fixed partial denture). Laboratory fixed partial denture (FPD) is made from FRC substructure and Hybrid/Microfill particulate composite veneer. Main indications: interim temporary FPD or FPD in cases of questionable abutment teeth, in aesthetic cases where All Ceram FPD is not feasible. Retention is attained by adhesive cementation to minimally prepared teeth or to conventionally prepared teeth; other options are inlay-onlay bridges or hybrid bridges. Contraindications are: poor hygiene, inability to control humidity, parafunction habits, and more than two pontics. Survival rate of FRC FPD over 5 years is 75%, lower compared to porcelain fused to metal FPD which is 95%. Main reasons for failure are: fracture of framework and delamination of the veneer. Part of the failures is repairable.

  7. PROJECT W-551 INTERIM PRETREATMENT SYSTEM PRECONCEPTUAL CANDIDATE TECHNOLOGY DESCRIPTIONS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MAY TH

    The Office of River Protection (ORP) has authorized a study to recommend and select options for interim pretreatment of tank waste and support Waste Treatment Plant (WTP) low activity waste (LAW) operations prior to startup of all the WTP facilities. The Interim Pretreatment System (IPS) is to be a moderately sized system which separates entrained solids and 137Cs from tank waste for an interim time period while WTP high level waste vitrification and pretreatment facilities are completed. This study's objective is to prepare pre-conceptual technology descriptions that expand the technical detail for selected solid and cesium separation technologies. This revisionmore » includes information on additional feed tanks.« less

  8. Victoria's review of registration for health practitioners.

    PubMed

    Scotts, H; Carter, M

    1988-01-01

    This article discusses some of the issues raised in the Interim Report of the current Review of Registration of Health Practitioners being conducted for the Victorian Health Department. The Report attempts to develop the framework in which the registration Boards will operate as part of a cohesive registration system. It proposed a mechanism and criteria for the registration of new groups as well as principles which can be applied to the ongoing review of each existing Board. The Review takes the perspective that registration of health practitioners carries with it both advantages and disadvantages for the general community. Under the proposed new system the controls exercised over health care providers by Registration Boards would be evaluated on the basis of to what extent the benefits to the public outweighed the potential costs. It is in this context that the Report addresses issues such as consumer complaints handling, registration of individual practitioners and controls over professional advertising and other business practices.

  9. NASA Presentation to TechAmerica G12 Committee

    NASA Technical Reports Server (NTRS)

    LaBel, Kenneth A.; Sampson, Michael J.

    2011-01-01

    This slide presentation reviews some of the actions that NASA is taking to address the issue of counterfeit electronic parts. While the emphasis is on electronic parts, the vision is broad enough to include materials and software. The effort includes coordination with other agencies, to identify and with the Government-Industry Data Exchange Program (GIDEP). An interim GIDEP Policy for suspected counterfeits was instituted. NASA's recommendation to the policy was for identification of the supplier and suggests allowing access to that information by government only. The issues with the General MIL specification, the testing requirements for radiation issues, the continuing development of Class Y standards for electronic equipment, status of package case isolation tests needed for 750 and 883,enhancement of 750 Internal Visual Inspection are reviewed. Further issues with consistent ESD control conditions across commodities, test methods, humidity limits, etc are briefly reviewed. The cost benefit analysis of film versus Real time radiography are also reviewed.

  10. Sam, Brookhaven, and the Physical Review

    NASA Astrophysics Data System (ADS)

    Blume, Martin

    2010-03-01

    Sam Goudsmit came to Brookhaven National Laboratory in 1948, just after the first year of operation of the new institution, and after a year of his postwar appointment as Professor of Physics at Northwestern University. He was named an associate editor of the Physical Review at that time, under the then Managing Editor John T. Tate of the University of Minnesota. Tate had been Editor since 1926, and had presided over the growth of Physical Review to leadership of publication in the world of physics. Tate died in 1950, and after a search under an interim Editor Sam was, in 1951, named Managing Editor. In 1952 he became Chair of the Brookhaven Physics Department, founded Physical Review Letters, and served as department chair until 1960, when he stepped down but remained an Associate Chair. I will discuss my own interactions with Sam during this later period, when I learned of his many faceted talents and accomplishments.

  11. Interim Policy on Stack Height Regulatory Actions

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  12. Interim Implementation of NSR Requirements for PM2.5

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  13. LINER FOR EXTRUSION BILLET CONTAINERS. Interim Technical Documentary Progress Report, June 5, 1962-September 5, 1962

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Spachner, S.A.

    1962-10-31

    A container-sleeve-liner assembly was designed which will provide adequate support for ceramic, ceramic coated metal, or metal liners. The design minimizes mechanical property requirements of liner materials, and permits rapid removal of worn or damaged liners. A high-strength stem was designed and fabricated. Technical literature on high-strength materials was reviewed, and high-strength materials producers were contacted to locate sources and assess applicability of existing materials for refractory metal extrusion liner use. (auth)

  14. Phase 1 of the near term hybrid passenger vehicle development program. Appendix B: Trade-off studies, volume 1

    NASA Technical Reports Server (NTRS)

    Traversi, M.; Piccolo, R.

    1980-01-01

    Tradeoff study activities and the analysis process used are described with emphasis on (1) review of the alternatives; (2) vehicle architecture; and (3) evaluation of the propulsion system alternatives; interim results are presented for the basic hybrid vehicle characterization; vehicle scheme development; propulsion system power and transmission ratios; vehicle weight; energy consumption and emissions; performance; production costs; reliability, availability and maintainability; life cycle costs, and operational quality. The final vehicle conceptual design is examined.

  15. Interim Data Changes in the Short-term Energy Outlook Data Systems Related to Electric Power Sector and Natural Gas Demand Data Revisions (Short-Term Energy Outlook Supplement December 2002)

    EIA Publications

    2002-01-01

    Beginning with the December 2002 issue of the Energy Information Administration's Short-Term Energy Outlook (STEO), electricity generation and related fuel consumption totals will be presented on a basis that is consistent with the definitions and aggregates used in the 2001 edition of EIA's Annual Energy Review (AER). Particularly affected by these changes are the demand and balancing item totals for natural

  16. Interim Policy Determination Related to NSR/PSD Significance Level for ODS

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  17. Focusing the Eyes Over America: Regulating and Training for the Ethical Domestic Use of Remote Piloted Aircraft (RPA)

    DTIC Science & Technology

    2011-02-01

    that can be taken to mitigate this problem. A review of existing regulations applicable to multiple government agencies will be conducted. This...of civil liberties, but by virtue of the fact the FAA controls when and where RPA can fly, their regulations have an impact on the protection or...Administration, Interim Operational Approval Guidance 08-01. Unmanned Aircraft Systems Operations in the U . S. National Airspace System, 13 March 2008, 5

  18. Transmittal of OAQPS Interim Control Policy Statement

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  19. Systems special investigation group

    NASA Technical Reports Server (NTRS)

    1991-01-01

    An interim report concerning the Long Duration Exposure Facility (LDEF) is presented by a Boeing Systems special investigation group (SIG). The SIG activities were divided into five engineering disciplines: electrical, mechanical, optics, thermal, and batteries/solar cells. The responsibilities of the SIG included the following areas: support de-integration at Kennedy Space Center (KSC); testing of hardware at Boeing; review of principal investigator (PI) test plans and test results; support of test activities at PI labs; and collation of all test results into the SIG database.

  20. The utility of Bayesian predictive probabilities for interim monitoring of clinical trials

    PubMed Central

    Connor, Jason T.; Ayers, Gregory D; Alvarez, JoAnn

    2014-01-01

    Background Bayesian predictive probabilities can be used for interim monitoring of clinical trials to estimate the probability of observing a statistically significant treatment effect if the trial were to continue to its predefined maximum sample size. Purpose We explore settings in which Bayesian predictive probabilities are advantageous for interim monitoring compared to Bayesian posterior probabilities, p-values, conditional power, or group sequential methods. Results For interim analyses that address prediction hypotheses, such as futility monitoring and efficacy monitoring with lagged outcomes, only predictive probabilities properly account for the amount of data remaining to be observed in a clinical trial and have the flexibility to incorporate additional information via auxiliary variables. Limitations Computational burdens limit the feasibility of predictive probabilities in many clinical trial settings. The specification of prior distributions brings additional challenges for regulatory approval. Conclusions The use of Bayesian predictive probabilities enables the choice of logical interim stopping rules that closely align with the clinical decision making process. PMID:24872363

  1. INTERIM -- Starlink Software Environment

    NASA Astrophysics Data System (ADS)

    Pearce, Dave; Pavelin, Cliff; Lawden, M. D.

    Early versions of this paper were based on a number of other papers produced at a very early stage of the Starlink project. They contained a description of a specific implementation of a subroutine library, speculations on the desirable attributes of a software environment, and future development plans. They reflected the experimental nature of the Starlink software environment at that time. Since then, the situation has changed. The implemented subroutine library, INTERIM_DIR:INTERIM.OLB, is now a well established and widely used piece of software. A completely new Starlink software environment (ADAM) has been developed and distributed. Thus the library released in 1980 as `STARLINK' and now called `INTERIM' has reached the end of its development cycle and is now frozen in its current state, apart from bug corrections. This paper has, therefore, been completely rewritten and restructured to reflect the new situation. Its aim is to describe the facilities of the INTERIM subroutine library as clearly and concisely as possible. It avoids speculation, discussion of design decisions, and announcements of future plans.

  2. Thin Film Ceramic Strain Sensor Development for Harsh Environments: Interim Report on Identification of Candidate Thin Film Ceramics to Test for Viability for Static Strain Sensor Development

    NASA Technical Reports Server (NTRS)

    Wrbanek, John D.; Fralick, Gustave C.; Hunter, Gary W.

    2006-01-01

    The need to consider ceramic sensing elements is brought about by the temperature limits of metal thin film sensors in propulsion system applications. In order to have a more passive method of negating changes of resistance due to temperature, an effort is underway at NASA Glenn to develop high temperature thin film ceramic static strain gauges for application in turbine engines, specifically in the fan and compressor modules on blades. Other applications can be on aircraft hot section structures and on thermal protection systems. The near-term interim goal of the research effort was to identify candidate thin film ceramic sensor materials to test for viability and provide a list of possible thin film ceramic sensor materials and corresponding properties to test for viability. This goal was achieved by a thorough literature search for ceramics that have the potential for application as high temperature thin film strain gauges, reviewing potential candidate materials for chemical and physical compatibility with our microfabrication procedures and substrates.

  3. 17 CFR 402.2a - Appendix A-Calculation of market risk haircut for purposes of § 402.2(g)(2).

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... larger in absolute value of the two residual position interim haircuts being netted, and (ii) zero, in... category of the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in... the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in the...

  4. 17 CFR 402.2a - Appendix A-Calculation of market risk haircut for purposes of § 402.2(g)(2).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... larger in absolute value of the two residual position interim haircuts being netted, and (ii) zero, in... category of the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in... the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in the...

  5. 17 CFR 402.2a - Appendix A-Calculation of market risk haircut for purposes of § 402.2(g)(2).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... larger in absolute value of the two residual position interim haircuts being netted, and (ii) zero, in... category of the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in... the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in the...

  6. 17 CFR 402.2a - Appendix A-Calculation of market risk haircut for purposes of § 402.2(g)(2).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... larger in absolute value of the two residual position interim haircuts being netted, and (ii) zero, in... category of the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in... the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in the...

  7. 17 CFR 402.2a - Appendix A-Calculation of market risk haircut for purposes of § 402.2(g)(2).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... larger in absolute value of the two residual position interim haircuts being netted, and (ii) zero, in... category of the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in... the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in the...

  8. Interim Report by Asia International Grid Connection Study Group

    NASA Astrophysics Data System (ADS)

    Omatsu, Ryo

    2018-01-01

    The Asia International Grid Connection Study Group Interim Report examines the feasibility of developing an international grid connection in Japan. The Group has investigated different cases of grid connections in Europe and conducted research on electricity markets in Northeast Asia, and identifies the barriers and challenges for developing an international grid network including Japan. This presentation introduces basic contents of the interim report by the Study Group.

  9. Commentary: Interim leadership of academic departments at U.S. medical schools.

    PubMed

    Grigsby, R Kevin; Aber, Robert C; Quillen, David A

    2009-10-01

    Medical schools and teaching hospitals are experiencing more frequent turnover of department chairs. Loss of a department chair creates instability in the department and may have a negative effect on the organization at large. Interim leadership of academic departments is common, and interim chairs are expected to immediately demonstrate skills and leadership abilities. However, little is known about how persons are prepared to assume the interim chair role. Newer competencies for effective leadership include an understanding of the business of medicine, interpersonal and communication skills, the ability to deal with conflict and solve adaptive challenges, and the ability to build and work on teams. Medical schools and teaching hospitals need assistance to meet the unique training and support needs of persons serving as interim leaders. For example, the Association of American Medical Colleges and individual chair societies can develop programs to allow current chairs to reflect on their present positions and plan for the future. Formal leadership training, mentorship opportunities, and conscientious succession planning are good first steps in preparing to meet the needs of academic departments during transitions in leadership. Also, interim leadership experience may be useful as a means for "opening the door" to underrepresented persons, including women, and increasing the diversity of the leadership team.

  10. Reanalysis Data Evaluation to Study Temperature Extremes in Siberia

    NASA Astrophysics Data System (ADS)

    Shulgina, T. M.; Gordov, E. P.

    2014-12-01

    Ongoing global climate changes are strongly pronounced in Siberia by significant warming in the 2nd half of 20th century and recent extreme events such as 2010 heat wave and 2013 flood in Russia's Far East. To improve our understanding of observed climate extremes and to provide to regional decision makers the reliable scientifically based information with high special and temporal resolution on climate state, we need to operate with accurate meteorological data in our study. However, from available 231 stations across Siberia only 130 of them present the homogeneous daily temperature time series. Sparse, station network, especially in high latitudes, force us to use simulated reanalysis data. However those might differ from observations. To obtain reliable information on temperature extreme "hot spots" in Siberia we have compared daily temperatures form ERA-40, ERA Interim, JRA-25, JRA-55, NCEP/DOE, MERRA Reanalysis, HadEX2 and GHCNDEX gridded datasets with observations from RIHMI-WDC/CDIAC dataset for overlap period 1981-2000. Data agreement was estimated at station coordinates to which reanalysis data were interpolated using modified Shepard method. Comparison of averaged over 20 year annual mean temperatures shows general agreement for Siberia excepting Baikal region, where reanalyses significantly underestimate observed temperature behavior. The annual temperatures closest to observed one were obtained from ERA-40 and ERA Interim. Furthermore, t-test results show homogeneity of these datasets, which allows one to combine them for long term time series analysis. In particular, we compared the combined data with observations for percentile-based extreme indices. In Western Siberia reanalysis and gridded data accurately reproduce observed daily max/min temperatures. For East Siberia, Lake Baikal area, ERA Interim data slightly underestimates TN90p and TX90p values. Results obtained allows regional decision-makers to get required high spatial resolution (0,25°×0,25°) climatic information products from the combined ERA data. The authors acknowledge partial financial support for this research from the RFBR (13-05-12034, 14-05-00502), SB RAS Integration projects (131, VIII.80.2.1.) and grant of the President of RF (№ 181).

  11. 76 FR 34964 - Stainless Steel Bar From India: Partial Rescission of Antidumping Duty Administrative Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-15

    ... India: Partial Rescission of Antidumping Duty Administrative Review AGENCY: Import Administration... the antidumping duty order on stainless steel bar from India for the period of review February 1, 2010... Limited (``Facor''), Grand Foundry Ltd. (``Grand Foundry''), India Steel Works Ltd. (``India Steel...

  12. Interobserver agreement of interim and end-of-treatment 18F-FDG PET/CT in diffuse large B-cell lymphoma (DLBCL): impact on clinical practice and trials.

    PubMed

    Burggraaff, Coreline N; Cornelisse, Alexander C; Hoekstra, Otto S; Lugtenburg, Pieternella J; de Keizer, Bart; Arens, Anne I J; Celik, Filiz; Huijbregts, Julia E; De Vet, Henrica C W; Zijlstra, Josee M

    2018-05-04

    We aimed to assess the interobserver agreement of Interim PET (I-PET) and End-of-Treatment PET (EoT-PET) using the Deauville 5-point scale (DS) in first-line DLBCL patients. Methods: I-PET and EoT-PET scans of DLBCL patients were performed in the HOVON84 study (2007-2012), an international multicenter randomized controlled trial. Patients received R-CHOP14 and were randomized to receive rituximab intensification in the first 4 cycles or not. I-PET was made after 4 cycles (for observational purposes), and EoT-PET scan after 6 or 8 cycles. Two independent central reviewers retrospectively scored all scans according to the DS-system, blinded to clinical outcomes. Results were dichotomised as 'negative' (DS: 1-3) or 'positive' (DS: 4-5). Besides percentage overall agreement we calculated agreement for positive and negative scores, expressed as positive agreement (PA) and negative agreement (NA), respectively. Results: 465 I-PET and 457 EoT-PET scans were centrally reviewed; baseline 18 F-FDG PET(/CT) was available in 75-77%, and CT in the remaining cases. Percentage overall agreement for I-PET and EoT-PET were 87.7% and 91.7% ( P =0.049), with NA of 92.0% and 95.0% ( P =0.091), and PA of 73.7% and 76.3% ( P =0.656), respectively. Conclusion: Interobserver agreement using DS in DLBCL patients in I-PET and EoT-PET yields high overall and negative agreement. The lower positive agreement suggests that EoT-PET/CT treatment evaluation in daily practice and I-PET adapted trials may benefit from dual reads and central review, respectively. Copyright © 2018 by the Society of Nuclear Medicine and Molecular Imaging, Inc.

  13. Establishing a store baseline during interim storage of waste packages and a review of potential technologies for base-lining

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McTeer, Jennifer; Morris, Jenny; Wickham, Stephen

    Interim storage is an essential component of the waste management lifecycle, providing a safe, secure environment for waste packages awaiting final disposal. In order to be able to monitor and detect change or degradation of the waste packages, storage building or equipment, it is necessary to know the original condition of these components (the 'waste storage system'). This paper presents an approach to establishing the baseline for a waste-storage system, and provides guidance on the selection and implementation of potential base-lining technologies. The approach is made up of two sections; assessment of base-lining needs and definition of base-lining approach. Duringmore » the assessment of base-lining needs a review of available monitoring data and store/package records should be undertaken (if the store is operational). Evolutionary processes (affecting safety functions), and their corresponding indicators, that can be measured to provide a baseline for the waste-storage system should then be identified in order for the most suitable indicators to be selected for base-lining. In defining the approach, identification of opportunities to collect data and constraints is undertaken before selecting the techniques for base-lining and developing a base-lining plan. Base-lining data may be used to establish that the state of the packages is consistent with the waste acceptance criteria for the storage facility and to support the interpretation of monitoring and inspection data collected during store operations. Opportunities and constraints are identified for different store and package types. Technologies that could potentially be used to measure baseline indicators are also reviewed. (authors)« less

  14. The yellowed archives of yellowcake.

    PubMed Central

    Silver, K

    1996-01-01

    Extensive historical documentation of exposures and releases at government-owned energy facilities is a unique and valuable resource for analyzing and communicating health risks. Facilities at all stages of the atomic fuel cycle were the subject of numerous industrial hygiene, occupational health, and environmental assessments during the Cold War period. Uranium mines and mills on the Colorado Plateau were investigated as early as the 1940s. One such facility was the mill in Monticello, Utah, which began operation as a vanadium extraction plant in 1943 and was later adapted to recover uranium from carnotite ores. The mill ceased operation in 1960. The site was added to the federal Superfund list in 1986. ATSDR held public availability sessions in 1993 as part of its public health assessment process, at which several former mill workers voiced health concerns. An extensive literature search yielded several industrial hygiene evaluations of the Monticello mill and health studies that included Monticello workers, only two of which had been published in the peer-reviewed literature. In combination with the broader scientific literature, these historical reports provide a partial basis for responding to mill workers' contemporary health concerns. The strengths and limitations of the available exposure data for analytical epidemiologic studies and dose reconstruction are discussed. As an interim measure, the available historical documentation may be especially helpful in communicating about health risks with workers and communities in ways that acknowledge the historical context of their experience. Images p116-a p117-a p118-a PMID:8606907

  15. Titan's cold case files - Outstanding questions after Cassini-Huygens

    NASA Astrophysics Data System (ADS)

    Nixon, C. A.; Lorenz, R. D.; Achterberg, R. K.; Buch, A.; Coll, P.; Clark, R. N.; Courtin, R.; Hayes, A.; Iess, L.; Johnson, R. E.; Lopes, R. M. C.; Mastrogiuseppe, M.; Mandt, K.; Mitchell, D. G.; Raulin, F.; Rymer, A. M.; Todd Smith, H.; Solomonidou, A.; Sotin, C.; Strobel, D.; Turtle, E. P.; Vuitton, V.; West, R. A.; Yelle, R. V.

    2018-06-01

    The entry of the Cassini-Huygens spacecraft into orbit around Saturn in July 2004 marked the start of a golden era in the exploration of Titan, Saturn's giant moon. During the Prime Mission (2004-2008), ground-breaking discoveries were made by the Cassini orbiter including the equatorial dune fields (flyby T3, 2005), northern lakes and seas (T16, 2006), and the large positive and negative ions (T16 & T18, 2006), to name a few. In 2005 the Huygens probe descended through Titan's atmosphere, taking the first close-up pictures of the surface, including large networks of dendritic channels leading to a dried-up seabed, and also obtaining detailed profiles of temperature and gas composition during the atmospheric descent. The discoveries continued through the Equinox Mission (2008-2010) and Solstice Mission (2010-2017) totaling 127 targeted flybys of Titan in all. Now at the end of the mission, we are able to look back on the high-level scientific questions from the start of the mission, and assess the progress that has been made towards answering these. At the same time, new scientific questions regarding Titan have emerged from the discoveries that have been made. In this paper we review a cross-section of important scientific questions that remain partially or completely unanswered, ranging from Titan's deep interior to the exosphere. Our intention is to help formulate the science goals for the next generation of planetary missions to Titan, and to stimulate new experimental, observational and theoretical investigations in the interim.

  16. The Archaeology of Coralville Lake, Iowa. Volume 4. Recreation Area Survey. (Interim Report 2).

    DTIC Science & Technology

    1985-09-01

    THE ARCHAEOLOGY OF CORALVILLE LAKE, IOWA VOLUME IV: RECREATION AREA SURVEY (INTERIM REPORT II) p - [ JAN 1 4 1986 WAUWATOSA. WISCONSIN 86 1.13 117...THE ARCHAEOLOGY OF CORALVILLE LAKE, IOWA ; VOLUME IV: RECREATION AREA SURVEY (INTERIM REPORT II) Submitted To: Rock Island District Corps of Engineers...presents the results of intensive archaeological and geomorphic investigations at 14 special use or recreation areas at Coralville Lake, Iowa . The

  17. Medicare and Medicaid programs; fire safety requirements for certain health care facilities; amendment. Interim final rule with comment period.

    PubMed

    2005-03-25

    This interim final rule with comment period adopts the substance of the April 15, 2004 temporary interim amendment (TIA) 00-1 (101), Alcohol Based Hand Rub Solutions, an amendment to the 2000 edition of the Life Safety Code, published by the National Fire Protection Association (NFPA). This amendment will allow certain health care facilities to place alcohol-based hand rub dispensers in egress corridors under specified conditions. This interim final rule with comment period also requires that nursing facilities install smoke detectors in resident rooms and public areas if they do not have a sprinkler system installed throughout the facility or a hard-wired smoke detection system in those areas.

  18. Volatility of aerosols in the western European environment. Interim report No. 1 thru 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jennings, S.G.

    1987-10-01

    The volatility apparatus to be used in the proposed work is being currently assembled at the Atmospheric Sciences Laboratory, White Sands Missile Range, New Mexico. When the volatility apparatus is constructed and tested it will be shipped to University College Galway. It is then planned to carry out field-volatility measurements of the ambient aerosol, primarily for the unmodified maritime air mass and secondly for the partially modified European continental air mass. Continuous measurements for periods up to some weeks spanning all four seasons are planned. In preparation for these measurements, a digital readout facility was acquired for the IM 146more » velocity and direction transmitter to be used for recording wind speed and direction. The measurement system was electronically processed to facilitate continuous recording on a microcomputer.« less

  19. 77 FR 76456 - Polyethylene Terephthalate Film, Sheet and Strip from Taiwan: Partial Rescission of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-28

    ... Film, Sheet and Strip from Taiwan: Partial Rescission of the Antidumping Duty Administrative Review... an administrative review of the antidumping duty (AD) order on polyethylene terephthalate film, sheet... Shinkong.\\3\\ On September 26, 2012, DuPont Teijin Films, one of the petitioners who requested the review...

  20. National NIF Diagnostic Program Fiscal Year 2002 Second Quarter Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MacGowan, B

    Since October 2001 the development of the facility diagnostics for NIF has been funded by the NIF Director through the National NIF Diagnostic Program (NNDP). The current emphasis of the NNDP is on diagnostics for the early NIF quad scheduled to be available for experiment commissioning in FY03. During the past six months the NNDP has set in place processes for funding diagnostics, developing requirements for diagnostics, design reviews and monthly status reporting. Those processes are described in an interim management plan for diagnostics (''National NIF Diagnostic Program Interim Plan'', NIF-0081315, April 2002) and a draft Program Execution Plan (''Programmore » Execution Plan for the National NlF Diagnostic Program'', NIF-0072083, October 2001) and documents cited therein. Work has been funded at Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), Naval Research Laboratory (NRL), Sandia National Laboratories (SNL), Bechtel Nevada at Los Alamos and Santa Barbara. There are no major technical risks with the early diagnostics. The main concerns relate to integration of the diagnostics into the facility, all such issues are being worked. This report is organized to show the schedule and budget status and a summary of Change Control Board actions for the past six months. The following sections then provide short descriptions of the status of each diagnostic. Where design reviews or requirements documents are cited, the documents are available on the Diagnostics file server or on request.« less

  1. Use of primary high-risk human papillomavirus testing for cervical cancer screening: interim clinical guidance.

    PubMed

    Huh, Warner K; Ault, Kevin A; Chelmow, David; Davey, Diane D; Goulart, Robert A; Garcia, Francisco A R; Kinney, Walter K; Massad, L Stewart; Mayeaux, Edward J; Saslow, Debbie; Schiffman, Mark; Wentzensen, Nicolas; Lawson, Herschel W; Einstein, Mark H

    2015-02-01

    In 2011, the American Cancer Society, the American Society for Colposcopy and Cervical Pathology, and the American Society for Clinical Pathology updated screening guidelines for the early detection of cervical cancer and its precursors. Recommended screening strategies were cytology and cotesting (cytology in combination with hrHPV testing). These guidelines also addressed the use of hrHPV testing alone as a primary screening approach, which was not recommended for use at that time. There is now a growing body of evidence for screening with primary hrHPV testing, including a prospective US-based registration study. Thirteen experts including representatives from the Society of Gynecologic Oncology, American Society for Colposcopy and Cervical Pathology, American College of Obstetricians and Gynecologists, American Cancer Society, American Society of Cytopathology, College of American Pathologists, and the American Society for Clinical Pathology, convened to provide interim guidance for primary hrHPV screening. This guidance panel was specifically triggered by an application to the FDA for a currently marketed HPV test to be labeled for the additional indication of primary cervical cancer screening. Guidance was based on literature review and review of data from the FDA registration study, supplemented by expert opinion. This document aims to provide information for healthcare providers who are interested in primary hrHPV testing and an overview of the potential advantages and disadvantages of this strategy for screening as well as to highlight areas in need of further investigation. Copyright © 2015 Elsevier Inc. All rights reserved.

  2. Capitation funding of primary health organisations in New Zealand: are enrolled populations being funded according to need?

    PubMed

    Langton, Jennifer; Crampton, Peter

    2008-04-18

    To determine whether the three main funding formulas for Primary Health Organisations achieved a stated aim of the Primary Health Care Strategy to fund enrolled populations according to need. National data were obtained from the Ministry of Health for a 12-month period beginning in April 2004: these included demographic characteristics of the enrolled Primary Health Organisation population, plus rates tables for: First-Contact Services, Services to Improve Access, and Health Promotion. Funding for Access and Interim practices for four-quarters was calculated for each of these three funding streams. Analysis of the demographic characteristics of Access and Interim practices was undertaken. Maori and Pacific peoples made up a greater proportion of the Access population than the Interim, had higher rates of deprivation than the non-Maori/non-Pacific population, and demonstrated a younger age distribution. The first quarter (April 2004-June 2004) showed there was preferential funding for Access PHOs and in particular high-needs groups. In quarter two, this level of preferential funding had diminished, coinciding with the introduction of increased government funding for all Interim enrolees aged 65 and over. The greater funding for Access enrolees was notably eroded with the introduction of Access-level funding for those aged 65+ in Interim PHOs. Since these data were analysed all remaining Interim age groups have shifted to Access-level funding, benefiting non-Maori /non-Pacific in Interim PHOs. The rapid shift to Access-level funding for First Contact Services has seen a continued erosion of the redistributive effect of the original needs-based formulas. A system cannot be considered equitable if some members of society are not realising their health potential, and financing of primary care should remain redistributive until such a time as this objective is attained.

  3. FY2017 Defense Spending Under an Interim Continuing Resolution (CR): In Brief

    DTIC Science & Technology

    2016-09-16

    rated based on the fraction of a year for which the interim CR is in effect . In recent fiscal years, the referenced funding level on which interim or...of the Federal Government: Causes, Processes, and Effects , coordinated by Clinton T. Brass. 8 Typically, such funding is specified as an annualized...congressional consideration of a CR to fund the federal government through the opening months of the fiscal year is widely anticipated. This report

  4. Predictive probability methods for interim monitoring in clinical trials with longitudinal outcomes.

    PubMed

    Zhou, Ming; Tang, Qi; Lang, Lixin; Xing, Jun; Tatsuoka, Kay

    2018-04-17

    In clinical research and development, interim monitoring is critical for better decision-making and minimizing the risk of exposing patients to possible ineffective therapies. For interim futility or efficacy monitoring, predictive probability methods are widely adopted in practice. Those methods have been well studied for univariate variables. However, for longitudinal studies, predictive probability methods using univariate information from only completers may not be most efficient, and data from on-going subjects can be utilized to improve efficiency. On the other hand, leveraging information from on-going subjects could allow an interim analysis to be potentially conducted once a sufficient number of subjects reach an earlier time point. For longitudinal outcomes, we derive closed-form formulas for predictive probabilities, including Bayesian predictive probability, predictive power, and conditional power and also give closed-form solutions for predictive probability of success in a future trial and the predictive probability of success of the best dose. When predictive probabilities are used for interim monitoring, we study their distributions and discuss their analytical cutoff values or stopping boundaries that have desired operating characteristics. We show that predictive probabilities utilizing all longitudinal information are more efficient for interim monitoring than that using information from completers only. To illustrate their practical application for longitudinal data, we analyze 2 real data examples from clinical trials. Copyright © 2018 John Wiley & Sons, Ltd.

  5. How the University of Texas system responded to the need for interim storage of low-level radioactive waste materials.

    PubMed

    Emery, Robert J

    2012-11-01

    Faced with the prospect of being unable to permanently dispose of low-level radioactive wastes (LLRW) generated from teaching, research, and patient care activities, component institutions of the University of Texas System worked collaboratively to create a dedicated interim storage facility to be used until a permanent disposal facility became available. Located in a remote section of West Texas, the University of Texas System Interim Storage Facility (UTSISF) was licensed and put into operation in 1993, and since then has provided safe and secure interim storage for up to 350 drums of dry solid LLRW at any given time. Interim storage capability provided needed relief to component institutions, whose on-site waste facilities could have possibly become overburdened. Experiences gained from the licensing and operation of the site are described, and as a new permanent LLRW disposal facility emerges in Texas, a potential new role for the storage facility as a surge capacity storage site in times of natural disasters and emergencies is also discussed.

  6. CMM Interim Check Design of Experiments (U)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Montano, Joshua Daniel

    2015-07-29

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length and include a weekly interim check to reduce risk. The CMM interim check makes use of Renishaw’s Machine Checking Gauge which is an off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. As verification on the interim check process a design of experiments investigation was proposed to test a couple of key factorsmore » (location and inspector). The results from the two-factor factorial experiment proved that location influenced results more than the inspector or interaction.« less

  7. Implementation of EPA criminal enforcement strategy for RCRA interim status facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1985-11-15

    The directive discusses criminal enforcement priorities and procedures related to the RCRA section 3007(e)(2) Loss of Interim Status (LOIS) provision, including: (1) identifying/targeting facilities with violations, (2) verifying receipt of RCRA 3007 letters, and (3) inspections of facilities. The directive supplements directive no. 9930.0-1 RCRA LOIS Enforcement Strategy, dated October 15, 1985. The directive is supplemented by directive no. 9930.0-2a, Accepting Nonhazardous Waste After Losing Interim Status, dated December 20, 1986.

  8. Implementation of the Ryan Haight Online Pharmacy Consumer Protection Act of 2008. Interim final rule with request for comments.

    PubMed

    2009-04-06

    The Ryan Haight Online Pharmacy Consumer Protection Act, which was enacted on October 15, 2008, amended the Controlled Substances Act and Controlled Substances Import and Export Act by adding several new provisions to prevent the illegal distribution and dispensing of controlled substances by means of the Internet. DEA is hereby issuing an interim rule to amend its regulations to implement the legislation and is requesting comments on the interim rule.

  9. Evaluation and analysis of Seasat-A scanning multichannel Microwave Radiometer (SMMR) Antenna Pattern Correction (APC) algorithm

    NASA Technical Reports Server (NTRS)

    Kitzis, J. L.; Kitzis, S. N.

    1979-01-01

    The brightness temperature data produced by the SMMR final Antenna Pattern Correction (APC) algorithm is discussed. The algorithm consisted of: (1) a direct comparison of the outputs of the final and interim APC algorithms; and (2) an analysis of a possible relationship between observed cross track gradients in the interim brightness temperatures and the asymmetry in the antenna temperature data. Results indicate a bias between the brightness temperature produced by the final and interim APC algorithm.

  10. French Interim MALE UAV Program

    DTIC Science & Technology

    2003-09-02

    MINISTÈRE DE LA DÉFENSE June, 13th 2002 Lcl Monsterleet FAF Staff J. Caron EADS S&DE-ISR FRENCH INTERIM MALE UAV PROGRAM 4 INDUSTRIAL STATUS Report...2003 2. REPORT TYPE N/A 3. DATES COVERED - 4. TITLE AND SUBTITLE French Interim Male UAV Program 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c...PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) EADS

  11. Conceptual design statement of work for the immobilized low-activity waste interim storage facility project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carlson, T.A., Fluor Daniel Hanford

    1997-02-06

    The Immobilized Low-Activity Waste Interim Storage subproject will provide storage capacity for immobilized low-activity waste product sold to the U.S. Department of Energy by the privatization contractor. This statement of work describes the work scope (encompassing definition of new installations and retrofit modifications to four existing grout vaults), to be performed by the Architect-Engineer, in preparation of a conceptual design for the Immobilized Low-Activity Waste Interim Storage Facility.

  12. 22 CFR 127.8 - Interim suspension.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... world peace or the security or foreign policy of the United States. The interim suspension orders... Trade Controls will issue an appropriate order disposing of the motion or petition and will promptly...

  13. How well do Reanalysis represent polar lows?

    NASA Astrophysics Data System (ADS)

    Zappa, G.; Shaffrey, L.; Hodges, K.

    2013-12-01

    Polar lows are intense maritime mesocyclones forming at high latitudes during polar air outbreaks. The associated high surface winds can be an important cause of coastal damage.They also seem to play a relevant role in the climate system by modulating the oceanic surface heat fluxes. This creates strong interest in understanding whether modern reanalysis datasets are able to represent polar lows, as well as how their representation may be sensitive to the model resolution. In this talk we investigate how ERA-Interim reanalysis represents the polar lows identified by the Norwegian meteorological services and listed in the STARS (Combination of Sea Surface Temperature and AltimeteR Synergy) dataset for the period 2002-2011. The sensitivity to resolution is explored by comparing ERA-Interim to the ECMWF operational analyses (2008-2011), which have three times higher horizontal resolution compared to ERA-Interim. We show that ERAI-Interim has excellent ability to capture the observed polar lows events with up to 90% of the observed events being found in the reanalysis. However, ERA-Interim tends to have polar lows of weaker dynamical intensity, in terms of both winds and vorticity, and with less spatial structure than in the ECMWF operational analyses (See Fig 1). Furthermore, we apply an objective feature tracking algorithm to the 3 hourly vorticity at 850 hPa with constraints on vorticity intensity and atmospheric static stability to objectively identify polar lows in the ERA-Interim reanalysis. We show that for the stronger polar lows the objective climatology shows good agreement with the STARS dataset over the 2002-2011 period. This allows us to extend the polar lows climatology over the whole ERA Interim period. Differences with another reanalysis product (NCEP-CFSR) will be also discussed. Fig 1: Composite of the tangential wind speed at 925 hPa for 34 polar lows observed in the Norwegian sea between 2008-2010 as represented by the ERA-Interim reanalysis (left) and by the ECMWF Operational analysis (right). Positive values indicate cyclonic circulation. The composite is centered on the polar low vorticity maxima and it is presented for a radial cap of 5 degrees of radius on the sphere (~550Km).

  14. Routine interim disease assessment in patients undergoing induction chemotherapy for acute myeloid leukemia: Can we do better?

    PubMed

    Campuzano-Zuluaga, Germán; Deutsch, Yehuda; Salzberg, Matthew; Gomez, Alexandra; Vargas, Fernando; Elias, Roy; Kwon, Deukwoo; Goodman, Mark; Ikpatt, Offiong F; Chapman, Jennifer R; Watts, Justin; Vega, Francisco; Swords, Ronan

    2016-03-01

    The presence of >5% blasts at "day 14" (D14), in patients undergoing induction chemotherapy for acute myeloid leukemia (AML) is problematic. It is unclear if a second course of chemotherapy for early persistent disease will alter outcome in these patients. We conducted a retrospective study of AML patients undergoing induction chemotherapy where diagnostic, interim (around day 14), and recovery (days 21-42) bone marrow (BM) evaluations were available for review. Of the 113 patients included in the final analysis, 99 (87.6%) achieved CR at hematologic recovery. At D14, 90 patients (79.6%) had <5% blasts and of these, 87 (96.7%) ultimately achieved CR. At D14, Twenty-three (20.4%) patients had residual leukemia (>5% blasts). Of these, 11 (47.8%) received a second course of chemotherapy (double induction [DI]) and 12 (52.2%) were observed until count recovery (single induction [SI]). No significant difference in CR rates was observed between these two groups (58.3% DI group vs. 45.5% SI group, P value = 0.684). In our analysis, D14 BM evaluation did not uniformly identify patients with primary induction failure. To unequivocally determine the value of a D14 marrow assessment in AML, prospective studies in the context of large cooperative group trials are required. Considering our findings and similar reports from others, we propose that D14 marrow assessment should be individualized, and that other factors, such as cytogenetics and early peripheral blood blast clearance should be considered, to identify patients most likely to benefit from interim disease assessment during AML induction therapy. © 2015 Wiley Periodicals, Inc.

  15. Evaluation of Extratropical Cyclone Precipitation in the North Atlantic Basin: An analysis of ERA-Interim, WRF, and two CMIP5 models.

    PubMed

    Booth, James F; Naud, Catherine M; Willison, Jeff

    2018-03-01

    The representation of extratropical cyclones (ETCs) precipitation in general circulation models (GCMs) and a weather research and forecasting (WRF) model is analyzed. This work considers the link between ETC precipitation and dynamical strength and tests if parameterized convection affects this link for ETCs in the North Atlantic Basin. Lagrangian cyclone tracks of ETCs in ERA-Interim reanalysis (ERAI), the GISS and GFDL CMIP5 models, and WRF with two horizontal resolutions are utilized in a compositing analysis. The 20-km resolution WRF model generates stronger ETCs based on surface wind speed and cyclone precipitation. The GCMs and ERAI generate similar composite means and distributions for cyclone precipitation rates, but GCMs generate weaker cyclone surface winds than ERAI. The amount of cyclone precipitation generated by the convection scheme differs significantly across the datasets, with GISS generating the most, followed by ERAI and then GFDL. The models and reanalysis generate relatively more parameterized convective precipitation when the total cyclone-averaged precipitation is smaller. This is partially due to the contribution of parameterized convective precipitation occurring more often late in the ETC life cycle. For reanalysis and models, precipitation increases with both cyclone moisture and surface wind speed, and this is true if the contribution from the parameterized convection scheme is larger or not. This work shows that these different models generate similar total ETC precipitation despite large differences in the parameterized convection, and these differences do not cause unexpected behavior in ETC precipitation sensitivity to cyclone moisture or surface wind speed.

  16. 76 FR 36092 - Antidumping Methodologies in Proceedings Involving Non-Market Economies: Valuing the Factor of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-21

    ...This notice addresses the methodology used by the Department of Commerce (``the Department'') to value the cost of labor in non- market economy (``NME'') countries. After reviewing all comments received on the Department's interim, industry-specific wage calculation methodology that is currently applied in NME antidumping proceedings, the Department has determined that the single surrogate- country approach is best. In addition, the Department has decided to use International Labor Organization (``ILO'') Yearbook Chapter 6A as its primary source of labor cost data in NME antidumping proceedings.

  17. V/STOL flight simulation

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The requirements for a new research aircraft to provide in-flight V/STOL simulation were reviewed. The required capabilities were based on known limitations of ground based simulation and past/current experience with V/STOL inflight simulation. Results indicate that V/STOL inflight simulation capability is needed to aid in the design and development of high performance V/STOL aircraft. Although a new research V/STOL aircraft is preferred, an interim solution can be provided by use of the X-22A, the CH-47B, or the 4AV-8B aircraft modified for control/display flight research.

  18. The Missing Pupils in the Schools of Ontario Today and Tomorrow. A Statement of Conditions, Causes & Issues. Interim Report [No. 1]. [Les Absents des Ecoles de l'Ontario Aujourd'hui et Demain. Description des Conditions, des Causes et des Problemes. Rapport Interimaire [No. 1].

    ERIC Educational Resources Information Center

    Jackson, R. W. B.

    This report assembles in a systematic fashion the currently available data on the conditions of Ontario's declining school enrollments and makes a preliminary statement of what is already known about its future dimensions. Chapters begin with a brief review of the past and present, largely in statistical terms, and end with projections of the…

  19. Release of Interim Policy on Federal Enforceability of Limitations on Potential to Emit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  20. Maumee Bay State Park, Ohio. Shoreline Erosion Beach Restoration Study. Final Feasibility Report and Final Environmental Impact Statement. Interim to Western Lake Erie Shore Study. Volume 2. Appendices. Revised.

    DTIC Science & Technology

    1983-12-01

    The vegetation is typified by a variety of vines and shrubs , including dogwood, sumac, wild plum, honeysuckle, wild grape, blackberry, honey locust...demand analysis. The SCORP studies for Ohio, Indiana , and Michigan were reviewed since most of *the Maumee Bay visitation was expected to originate...Bay State Park by State, by Zone :Distance: Zone:In Miles: Ohio Michigan : Indiana :Pennsylvania: Canada 1 : 0-25 :Lucas :Monroe :None :None :None

  1. A Brief Survey of the Mosquitoes of South Sulawesi, Indonesia, with Special Reference to the Identity of ’Anopheles barbirostris’ (Diptera: Culicidae) from the Margolembo Area

    DTIC Science & Technology

    1977-06-20

    mosquitoes hitherto recorded from Sulawesi and adjacent islands is presented. The prevalence of malaria and filariasis in transmigration villages of...East Indian mosquitoes. Bull. Ent. Res. 25: 501-19, illus. 1939. Notes on Dutch East- Indian mosquitoes. Tij&hr. Ent. 82: 91-113, illus. Brug, S...Macdonald, W. W. 1957. Malaysian parasites. XVI. An interim review of the non-anopheline mosquitoes of Malaya. Stud. Inst. Med. Res., Malaya 28: l-34

  2. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... misconduct. Such an order will normally be issued on recommendation from OIG and in consultation with the...

  3. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... misconduct. Such an order will normally be issued on recommendation from OIG and in consultation with the...

  4. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... misconduct. Such an order will normally be issued on recommendation from OIG and in consultation with the...

  5. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... misconduct. Such an order will normally be issued on recommendation from OIG and in consultation with the...

  6. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... misconduct. Such an order will normally be issued on recommendation from OIG and in consultation with the...

  7. 7 CFR 1710.109 - Reimbursement of general funds and interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... be limited, except in cases of extreme financial hardship as determined by the Administrator, to the...) Policies for reimbursement of general funds and interim financing following certain mergers, consolidations...

  8. Preventive maintenance study : interim report.

    DOT National Transportation Integrated Search

    2017-09-01

    This interim report details the performance of 69 test sites treated with various preventive maintenance treatments. The maintenance treatments applied included crack sealing, full lane chip sealing, wheel path chip sealing, dig outs (mill and fill),...

  9. Interim Open Source Software (OSS) Policy

    EPA Pesticide Factsheets

    This interim Policy establishes a framework to implement the requirements of the Office of Management and Budget's (OMB) Federal Source Code Policy to achieve efficiency, transparency and innovation through reusable and open source software.

  10. Interim Policy for Evaluation of Stereoisomeric Pesticides

    EPA Pesticide Factsheets

    An interim approach for determining data requirements for non-racemic mixtures of stereoisomeric pesticides. These data are needed in order to assess the risk posed to ecosystems and drinking water sources by these mixtures.

  11. EPA's Revised Interim Financial Assistance Conflict of Interest Policy

    EPA Pesticide Factsheets

    EPA has established the following revised interim policy governing disclosure of actual and potential conflicts of interest (COI Policy) by applicants for, and recipients of, federal financial assistance awards from EPA.

  12. An allowable cladding peak temperature for spent nuclear fuels in interim dry storage

    NASA Astrophysics Data System (ADS)

    Cha, Hyun-Jin; Jang, Ki-Nam; Kim, Kyu-Tae

    2018-01-01

    Allowable cladding peak temperatures for spent fuel cladding integrity in interim dry storage were investigated, considering hydride reorientation and mechanical property degradation behaviors of unirradiated and neutron irradiated Zr-Nb cladding tubes. Cladding tube specimens were heated up to various temperatures and then cooled down under tensile hoop stresses. Cool-down specimens indicate that higher heat-up temperature and larger tensile hoop stress generated larger radial hydride precipitation and smaller tensile strength and plastic hoop strain. Unirradiated specimens generated relatively larger radial hydride precipitation and plastic strain than did neutron irradiated specimens. Assuming a minimum plastic strain requirement of 5% for cladding integrity maintenance in interim dry storage, it is proposed that a cladding peak temperature during the interim dry storage is to keep below 250 °C if cladding tubes are cooled down to room temperature.

  13. Plutonium storage criteria

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chung, D.; Ascanio, X.

    1996-05-01

    The Department of Energy has issued a technical standard for long-term (>50 years) storage and will soon issue a criteria document for interim (<20 years) storage of plutonium materials. The long-term technical standard, {open_quotes}Criteria for Safe Storage of Plutonium Metals and Oxides,{close_quotes} addresses the requirements for storing metals and oxides with greater than 50 wt % plutonium. It calls for a standardized package that meets both off-site transportation requirements, as well as remote handling requirements from future storage facilities. The interim criteria document, {open_quotes}Criteria for Interim Safe Storage of Plutonium-Bearing Solid Materials{close_quotes}, addresses requirements for storing materials with less thanmore » 50 wt% plutonium. The interim criteria document assumes the materials will be stored on existing sites, and existing facilities and equipment will be used for repackaging to improve the margin of safety.« less

  14. Impacts of domestic violence on child growth and nutrition: a conceptual review of the pathways of influence.

    PubMed

    Yount, Kathryn M; DiGirolamo, Ann M; Ramakrishnan, Usha

    2011-05-01

    Domestic violence against women is a global problem, and young children are disproportionate witnesses. Children's exposure to domestic violence (CEDV) predicts poorer health and development, but its effects on nutrition and growth are understudied. We propose a conceptual framework for the pathways by which domestic violence against mothers may impair child growth and nutrition, prenatally and during the first 36 months of life. We synthesize literatures from multiple disciplines and critically review the evidence for each pathway. Our review exposes gaps in knowledge and opportunities for research. The framework also identifies interim strategies to mitigate the effects of CEDV on child growth and nutrition. Given the global burden of child malnutrition and its long-term effects on human-capital formation, improving child growth and nutrition may be another reason to prevent domestic violence and its cascading after-effects. Copyright © 2011 Elsevier Ltd. All rights reserved.

  15. MRI screening for breast cancer in women at high risk; is the Australian breast MRI screening access program addressing the needs of women at high risk of breast cancer?

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schenberg, Tess; Familial Cancer Centre, Peter MacCallum Cancer Centre, Melbourne, Victoria; Mitchell, Gillian

    Breast magnetic resonance imaging (MRI) screening of women under 50 years old at high familial risk of breast cancer was given interim funding by Medicare in 2009 on the basis that a review would be undertaken. An updated literature review has been undertaken by the Medical Services Advisory Committee but there has been no assessment of the quality of the screening or other screening outcomes. This review examines the evidence basis of breast MRI screening and how this fits within an Australian context with the purpose of informing future modifications to the provision of Medicare-funded breast MRI screening in Australia.more » Issues discussed will include selection of high-risk women, the options for MRI screening frequency and measuring the outcomes of screening.« less

  16. Accessing the medical devices market in Egypt and Saudi Arabia: a systematic review of policies and regulations.

    PubMed

    Gad, Mohamed; Kriza, Christine; Fidler, Armin; Kolominsky-Rabas, Peter

    2016-07-01

    Despite the significant medical devices market size in Egypt and Saudi Arabia, information regarding policies and regulations for medical devices market access is highly deficient. The aim of this paper is to provide a systematic review on market access policies and regulations in both countries, to allow safe and timely access to medical technology. The following databases were searched: PubMed, Science Direct, Scopus, and Al Manhal Arabic database. Additionally, the web portals of regulatory authorities of both countries were searched. There are 34 records included in the qualitative synthesis of this review. Expert commentary: Main findings include; adopted regulatory framework from reference countries, and interim main regulatory documents, In conclusion, the market access schemes are relatively structured. However, some recommendations are put forward to navigate towards a more comprehensive policy framework in both countries.

  17. The role and meaning of interim housing in housing first programs for people experiencing homelessness and mental illness.

    PubMed

    Zerger, Suzanne; Francombe Pridham, Katherine; Jeyaratnam, Jeyagobi; Connelly, Jolynn; Hwang, Stephen; O'Campo, Patricia; Stergiopoulos, Vicky

    2014-07-01

    The housing first (HF) model for individuals experiencing homelessness and mental illness differs by design from traditional models that require consumers to achieve "housing readiness" by meeting program or treatment prerequisites in transitional housing settings prior to permanent housing placement. Given a growing body of evidence for its favorable outcomes and cost effectiveness, HF is increasingly seen as an alternative to and argument against these traditional programs. As such, it is important that the elements and implementation challenges of the HF model be clearly understood and articulated. This qualitative study explored a largely unexamined aspect of the HF model-the need for and meaning of temporary residential settings (interim housing), a place to stay while waiting to secure permanent housing-using interviews and focus groups with service providers and consumers who experienced interim housing during implementation of HF in a large urban center. Although interim housing may not be necessary for all programs implementing the model, our study revealed numerous reasons and demands for safe, flexible interim housing options, and illustrated how they influence the effectiveness of consumer recovery, continuous service engagement, and housing stability.

  18. What a Difference a Day Makes: Change in Memory for Newly Learned Word Forms Over 24 Hours

    PubMed Central

    McGregor, Karla K.

    2014-01-01

    Purpose This study explored the role of time and retrieval experience in the consolidation of word forms. Method Participants were 106 adults trained on 16 novel word-referent pairs, then tested immediately and 24 hr later for recognition and recall of word forms. In the interim, tests were repeated 2 hr or 12 hr after training, or not at all, thus varying the amount and timing of retrieval experience. Results Recognition accuracy was stable and speed improved over the 24-hr period. But these manifestations of consolidation did not depend on interim retrieval experience; in fact, the 2-hr interim test interfered with improvements in speed. In contrast, the number of word forms recalled increased only with interim retrieval experiences, and the 12-hr interim test was more advantageous to recall than the 2-hr test. Conclusions After a word form is encoded, it can become stronger with time. Retrieval experience can also strengthen the trace, but, if retrieval occurs when the memory is still labile, it can be disruptive. This complex interplay between retrieval experience and time holds implications for measuring learning outcomes and for scheduling practice in classrooms and clinics. PMID:24845578

  19. Interim Guidance: Municipal Solid Waste Exemption under Superfund

    EPA Pesticide Factsheets

    Interim guidance discusses the statutory provisions of CERCLA § 107(p) and identifies some factors to be considered by EPA and DOJ staff in exercising their enforcement discretion of MSW at an NPL site.

  20. Interim report : a non-overlay cathodic protection system.

    DOT National Transportation Integrated Search

    1983-01-01

    This interim report describes Virginia's experience in installing its first cathodic protection system for a bridge deck. The installation was completed with practically no problems. Very minor problems have been encountered with the rectifier/contro...

  1. Amendment to the interim final rules for group health plans and health insurance coverage relating to status as a grandfathered health plan under the Patient Protection and Affordable Care Act. Amendment to interim final rules with request for comments.

    PubMed

    2010-11-17

    This document contains an amendment to interim final regulations implementing the rules for group health plans and health insurance coverage in the group and individual markets under provisions of the Patient Protection and Affordable Care Act regarding status as a grandfathered health plan; the amendment permits certain changes in policies, certificates, or contracts of insurance without loss of grandfathered status.

  2. PCoD Lite - Using an Interim PCoD Protocol to Assess the Effects of Disturbance Associated with US Navy Exercises on Marine Mammal Populations

    DTIC Science & Technology

    2014-09-30

    1 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. PCoD Lite - Using an Interim PCoD Protocol to Assess...Skookum Tom Road Friday Harbor, WA, USA phone: 1-360-370-5493 email: jw@smrullc.com Award Number: N000141410406 http://www.smrumarine.com/ pcod ...DATE 30 SEP 2014 2. REPORT TYPE 3. DATES COVERED 00-00-2014 to 00-00-2014 4. TITLE AND SUBTITLE PCoD Lite - Using an Interim PCoD Protocol to

  3. Interim Radiological Scoping and Characterization Survey Report, 1963 Igloo 572 Accident (Former Medina Base), Lackland Training Annex, Lackland AFB, Texas

    DTIC Science & Technology

    2002-03-01

    9045 4 8985 4 9001 5 8804 5 8893 Mean: 8788.8 Mean: 8925.4 Expected S.D.: 93.7 Expected S.D.: 94.5 Standard Dev.: 136.9 Standard Dev.: 107.4 Variance...subject to lit]) severe criminal penalties. Dissemination in 200204 5 042accordance with DoD Directive 5230.25" Air Force Institute for Environment...COVERED March 2002 INTERIM (2001 - 2002) 4. TITLE AND SUBTITLE 5 . FUNDING NUMBERS Interim Radiological Scoping and Characterization Survey Report, 1963

  4. Interim Land Use Control Implementation Plan

    NASA Technical Reports Server (NTRS)

    Applegate, Joseph L.

    2014-01-01

    This Interim Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Kennedy Space Center (KSC) Contractors Road Heavy Equipment (CRHE) Area (SWMU 055; "the Site") of institutional controls that have been implemented at the Site1. Although there are no current unacceptable risks to human health or the environment associated with the CRHE Area, an interim institutional land use control (LUC) is necessary to prevent human health exposure to volatile organic compound (VOC)-affected groundwater at the Site. Controls will include periodic inspection, condition certification, and agency notification.

  5. Integrated waste management system costs in a MPC system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Supko, E.M.

    1995-12-01

    The impact on system costs of including a centralized interim storage facility as part of an integrated waste management system based on multi-purpose canister (MPC) technology was assessed in analyses by Energy Resources International, Inc. A system cost savings of $1 to $2 billion occurs if the Department of Energy begins spent fuel acceptance in 1998 at a centralized interim storage facility. That is, the savings associated with decreased utility spent fuel management costs will be greater than the cost of constructing and operating a centralized interim storage facility.

  6. 340B Drug Pricing Program Ceiling Price and Manufacturer Civil Monetary Penalties Regulation. Final rule; further delay of effective date.

    PubMed

    2017-05-19

    The Health Resources and Services Administration (HRSA) administers section 340B of the Public Health Service Act (PHSA), referred to as the "340B Drug Pricing Program" or the "340B Program." HRSA published a final rule on January 5, 2017, that set forth the calculation of the ceiling price and application of civil monetary penalties. The final rule applied to all drug manufacturers that are required to make their drugs available to covered entities under the 340B Program. In accordance with a January 20, 2017, memorandum from the Assistant to the President and Chief of Staff, entitled "Regulatory Freeze Pending Review," HRSA issued an interim final rule that delayed the effective date of the final rule published in the Federal Register (82 FR 1210, (January 5, 2017)) to May 22, 2017. HHS invited commenters to provide their views on whether a longer delay of the effective date to October 1, 2017, would be more appropriate. After consideration of the comments received on the interim final rule, HHS is delaying the effective date of the January 5, 2017 final rule, to October 1, 2017.

  7. The role of FDG-PET in Hodgkin lymphoma

    PubMed Central

    Hałka, Janusz; Dziuk, Mirosław

    2017-01-01

    18-fluoro-2-deoxy-D-glucose (FDG) positron emission tomography (PET)/computed tomography (CT) is currently the most valuable imaging technique in Hodgkin lymphoma. Since its first use in lymphomas in the 1990s, it has become the gold standard in the staging and end-of-treatment remission assessment in patients with Hodgkin lymphoma. The possibility of using early (interim) PET during first-line therapy to evaluate chemosensitivity and thus personalize treatment at this stage holds great promise, and much attention is now being directed toward this goal. With high probability, it is believed that in the near future, the result of interim PET-CT would serve as a compass to optimize treatment. Also the role of PET in pre-transplant assessment is currently evolving. Much controversy surrounds the possibility of detecting relapse after completed treatment with the use of PET in surveillance in the absence of symptoms suggestive of recurrence and the results of published studies are rather discouraging because of low positive predictive value. This review presents current knowledge about the role of 18-FDG-PET/CT imaging at each point of management of patients with Hodgkin lymphoma. PMID:28947879

  8. Financial responsibilities under RCRA. Hearing before the Subcommittee on Commerce, Transportation, and Tourism of the Committee on Energy and Commerce, House of Representatives, Ninety-Ninth Congress, First Session on H. R. 3692, November 13, 1985

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1986-01-01

    Representatives of environmental organizations, the Hazardous Waste Treatment Council, and regulators were among those testifying at a hearing on H.R. 3692, which amends the Resource Conservation and Recovery Act (RCRA) of 1976. The bill is in response to concerns that the Environmental Protection Agency (EPA) has not compiled with the intent of RCRA in its failure to move beyond interim permits to issue final permits to land disposal facilities accepting hazardous wastes. Reported leakage and environmental risks from sites operating under interim permits raises questions about how disposal companies could deal with liability claims. At issue was whether Congress needsmore » to take new action to develop regulations under which financially responsible companies can operate or whether new EPA rules can solve the problem. A spokesman for EPA reviewed the liability insurance problem and the status of the insurance market in this context. Material submitted for the record follows the text of H.R. 3692 and the testimony of 11 witnesses.« less

  9. The cost and impact of the interim federal health program cuts on child refugees in Canada.

    PubMed

    Evans, Andrea; Caudarella, Alexander; Ratnapalan, Savithiri; Chan, Kevin

    2014-01-01

    On June 30, 2012, Interim Federal Health Program (IFHP) funding was cut for refugee claimant healthcare. The potential financial and healthcare impacts of these cuts on refugee claimants are unknown. We conducted a one-year retrospective chart review spanning 6 months before and after IFHP funding cuts at The Hospital for Sick Children, a tertiary care children's hospital in Toronto. We analyzed emergency room visits characteristics, admission rates, reasons for admission, and financial records including billing from Medavie Blue Cross. There were 173 refugee children visits to the emergency room in the six months before and 142 visits in the six months after funding cuts. The total amount billed to the IFHP program during the one-year of this study was $131,615. Prior to the IFHP cuts, 46% of the total emergency room bills were paid by IFHP compared to 7% after the cuts (p<0.001). After the cuts to the IFHP, The Hospital for Sick Children was unable to obtain federal health coverage for the vast majority of refugee claimant children registered under the IFHP. This preliminary analysis showed that post-IFHP cuts healthcare costs at the largest tertiary pediatric institution in the country increased.

  10. 75 FR 26199 - Stainless Steel Bar from India: Partial Rescission of Antidumping Duty Administrative Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-11

    ... DEPARTMENT OF COMMERCE International Trade Administration [A-533-810] Stainless Steel Bar from India: Partial Rescission of Antidumping Duty Administrative Review AGENCY: Import Administration, International Trade Administration, Department of Commerce. EFFECTIVE DATE: May 11, 2010. FOR FURTHER...

  11. Teaching undergraduates the process of peer review: learning by doing.

    PubMed

    Rangachari, P K

    2010-09-01

    An active approach allowed undergraduates in Health Sciences to learn the dynamics of peer review at first hand. A four-stage process was used. In stage 1, students formed self-selected groups to explore specific issues. In stage 2, each group posted their interim reports online on a specific date. Each student read all the other reports and prepared detailed critiques. In stage 3, each report was discussed at sessions where the lead discussant was selected at random. All students participated in the peer review process. The written critiques were collated and returned to each group, who were asked to resubmit their revised reports within 2 wk. In stage 4, final submissions accompanied by rebuttals were graded. Student responses to a questionnaire were highly positive. They recognized the individual steps in the standard peer review, appreciated the complexities involved, and got a first-hand experience of some of the inherent variabilities involved. The absence of formal presentations and the opportunity to read each other's reports permitted them to study issues in greater depth.

  12. Non Surgical Correction of Mandibular Deviation and Neuromuscular Coordination after Two years of Mandibular Guidance Therapy: A Case Report.

    PubMed

    Singh, Bijay; Sinha, Nidhi; Sharma, Rohit; Parekh, Narzi

    2015-11-01

    Carcinomas of the mandible may require resection of a segment of bone (continuity defect), partial removal of bone (discontinuity defect), tongue, and floor of the mouth and muscle attachments. Patients undergoing such treatment suffer from facial disfigurement, loss of muscle function, loss of neuromuscular coordination resulting in inability to masticate and swallow acceptably. Surgical reconstruction may not always be possible because of high reoccurrence rate, inability of the patient to cope with another surgery etc. The treatment of choice in non surgical cases is prosthetic rehabilitation using guiding flange prosthesis. This article describes the management of a patient who had undergone hemimandibulectomy and was not willing for a surgical reconstruction. Interim maxillary ramp prosthesis was given to the patient 15 days postoperatively followed by definitive guiding flange prosthesis for two years after which the patient was able to occlude in centric occlusal position without any aid.

  13. Record of decision, Bomarc Missile Accident Site, Mcguire AFB, New Jersey. Final report, November 1989-May 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    West, G.

    1992-11-20

    This document presents the selected final remedial action for the radioactive wastes at the BOMARC Missile Site, McGuire Air Force Base, New Jersey. The BOMARC Missile Site became contaminated in 1960 as the result of a fire which partially consumed a nuclear warhead-equipped BOMARC missile. The Air Force has decided to pursue excavation and Off-site Disposal of contaminated waste at a Department of Energy (DOE) disposal facility. This is a cost effective, permanent remedy, and is the environmentally preferred alternative. However, should the Air Force be denied the use of a DOE facility, or if other events should dramatically decreasemore » the cost effectiveness of this remedy, then as an interim remedy, the Air Force will maintain the BOMARC Missile Site in accordance with the NEPA No Action Alternative.« less

  14. A randomized controlled trial of interim methadone maintenance.

    PubMed

    Schwartz, Robert P; Highfield, David A; Jaffe, Jerome H; Brady, Joseph V; Butler, Carol B; Rouse, Charles O; Callaman, Jason M; O'Grady, Kevin E; Battjes, Robert J

    2006-01-01

    Effective alternatives to long waiting lists for entry into methadone hydrochloride maintenance treatment are needed to reduce the complications of continuing heroin dependence and to increase methadone treatment entry. To compare the effectiveness of interim methadone maintenance with that of the usual waiting list condition in facilitating methadone treatment entry and reducing heroin and cocaine use and criminal behavior. Randomized, controlled, clinical trial using 2 conditions, with treatment assignment on a 3:2 basis to interim maintenance-waiting list control. A methadone treatment program in Baltimore. A total of 319 individuals meeting the criteria for current heroin dependence and methadone maintenance treatment. Participants were randomly assigned to either interim methadone maintenance, consisting of an individually determined methadone dose and emergency counseling only for up to 120 days, or referral to community-based methadone treatment programs. Entry into comprehensive methadone maintenance therapy at 4 months from baseline; self-reported days of heroin use, cocaine use, and criminal behavior; and number of urine drug test results positive for heroin and cocaine at the follow-up interview conducted at time of entry into comprehensive methadone treatment (or at 4 months from baseline for participants who did not enter regular treatment). Significantly more participants assigned to the interim methadone maintenance condition entered comprehensive methadone maintenance treatment by the 120th day from baseline (75.9%) than those assigned to the waiting list control condition (20.8%) (P<.001). Overall, in the past 30 days at follow-up, interim participants reported significantly fewer days of heroin use (P<.001), had a significant reduction in heroin-positive drug test results (P<.001), reported spending less money on drugs (P<.001), and received less illegal income (P<.02) than the waiting list participants. Interim methadone maintenance results in a substantial increase in the likelihood of entry into comprehensive treatment, and is an effective means of reducing heroin use and criminal behavior among opioid-dependent individuals awaiting entry into a comprehensive methadone treatment program.

  15. 5th ESA Workshop on Joint Interim Approaches to NAS Recommendations

    EPA Pesticide Factsheets

    EPA and its federal partners, Fish and Wildlife Service and National Marine Fisheries Service, held a two-day meeting that provided a forum for stakeholder suggestions for refining some of the interim scientific methods

  16. 77 FR 31374 - Notice of Submission of Proposed Information Collection to OMB; Rural Housing Stability Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-25

    ... through the HEARTH Act. The statutory provisions and the implementing interim regulations that govern RHSP... HEARTH Act. The statutory provisions and the implementing interim regulations that govern RHSP require...

  17. Intelligent cruise control field operational test : interim report

    DOT National Transportation Integrated Search

    1997-03-01

    This interim document reports on a cooperative agreement between NHTSA and UMTRI entitled Intelligent Cruise Control (ICC) Field Operational Test (FOT). The overarching goal of the work is to characterize safety and comfort issues that are fundamenta...

  18. Computerization of material test data reporting system : interim report.

    DOT National Transportation Integrated Search

    1973-09-01

    This study was initiated to provide an integrated system of reporting, storing, and retrieving of construction and material test data using computerized (storage-retrieval) and quality control techniques. The findings reported in this interim report ...

  19. 2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D. Shanklin

    2006-07-19

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report describes inspection and monitoring activities fro the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13,more » Record of Decision for the Group 1, Tank Farm Interim Action, (DOE/ID-10660) and as amended by the agreement to resolve dispute, which was effective in February 2003.« less

  20. 2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D. E. Shanklin

    2007-02-14

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action ismore » functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action (DOE/ID-10660) as described in the Group 1 Remedial Design/Remedial Action Work Plan (DOE/ID-10772).« less

  1. Using ERA-Interim reanalysis for creating datasets of energy-relevant climate variables

    NASA Astrophysics Data System (ADS)

    Jones, Philip D.; Harpham, Colin; Troccoli, Alberto; Gschwind, Benoit; Ranchin, Thierry; Wald, Lucien; Goodess, Clare M.; Dorling, Stephen

    2017-07-01

    The construction of a bias-adjusted dataset of climate variables at the near surface using ERA-Interim reanalysis is presented. A number of different, variable-dependent, bias-adjustment approaches have been proposed. Here we modify the parameters of different distributions (depending on the variable), adjusting ERA-Interim based on gridded station or direct station observations. The variables are air temperature, dewpoint temperature, precipitation (daily only), solar radiation, wind speed, and relative humidity. These are available on either 3 or 6 h timescales over the period 1979-2016. The resulting bias-adjusted dataset is available through the Climate Data Store (CDS) of the Copernicus Climate Change Data Store (C3S) and can be accessed at present from ftp://ecem.climate.copernicus.eu. The benefit of performing bias adjustment is demonstrated by comparing initial and bias-adjusted ERA-Interim data against gridded observational fields.

  2. The WFIRST Interim Design Reference Mission: Capabilities, Constraints, and Open Questions

    NASA Technical Reports Server (NTRS)

    Kruk, Jeffrey W.

    2012-01-01

    The Project Office and Science Definition Team for the Wide-Field Infrared Survey Telescope (WFIRST) are in the midst of a pre-Phase A study to establish a Design Reference Mission (DRM). An Interim report was released in June 2011, with a final report due later in 2012. The predicted performance of the Interim DRM Observatory will be described, including optical quality, observing efficiency, and sensitivity for representative observing scenarios. Observing constraints and other limitations on performance will also be presented, with an emphasis on potential Guest Observer programs. Finally, a brief status update will be provided on open trade studies of interest to the scientific community. The final DRM may differ from the Interim DRM presented here. However, the underlying requirements of the scientific programs are not expected to change, hence the capabilities of the IDRM are likely to be maintained even if the implementation changes in significant ways.

  3. Effectiveness of Nissen fundoplication versus anterior and posterior partial fundoplications for treatment of gastro-esophageal reflux disease: a systematic review protocol.

    PubMed

    Marshall-Webb, Matthew; Peters, Micah D J; Bright, Tim; Watson, David I

    2018-05-01

    The objective of this review is to determine the relative effectiveness of Nissen fundoplication compared to anterior and posterior partial fundoplication in controlling the symptoms of gastro-esophageal reflux disease and reducing their side effect profile in adults.The specific questions posed by this review are: what is the effectiveness of Nissen fundoplication in comparison to anterior partial fundoplication (90 degree, 120 degree and 180 degree) and posterior 270 degree fundoplication in terms of symptom control of gastro-esophageal reflux disease, and what are the side effects of these surgical interventions?

  4. Digital tomosynthesis of the chest for lung nodule detection: interim sensitivity results from an ongoing NIH-sponsored trial.

    PubMed

    James, T Dobbins; McAdams, H Page; Song, Jae-Woo; Li, Christina M; Godfrey, Devon J; DeLong, David M; Paik, Sang-Hyun; Martinez-Jimenez, Santiago

    2008-06-01

    The authors report interim clinical results from an ongoing NIH-sponsored trial to evaluate digital chest tomosynthesis for improving detectability of small lung nodules. Twenty-one patients undergoing computed tomography (CT) to follow up lung nodules were consented and enrolled to receive an additional digital PA chest radiograph and digital tomosynthesis exam. Tomosynthesis was performed with a commercial CsI/a-Si flat-panel detector and a custom-built tube mover. Seventy-one images were acquired in 11 s, reconstructed with the matrix inversion tomosynthesis algorithm at 5-mm plane spacing, and then averaged (seven planes) to reduce noise and low-contrast artifacts. Total exposure for tomosynthesis imaging was equivalent to that of 11 digital PA radiographs (comparable to a typical screen-film lateral radiograph or two digital lateral radiographs). CT scans (1.25-mm section thickness) were reviewed to confirm presence and location of nodules. Three chest radiologists independently reviewed tomosynthesis images and PA chest radiographs to confirm visualization of nodules identified by CT. Nodules were scored as: definitely visible, uncertain, or not visible. 175 nodules (diameter range 3.5-25.5 mm) were seen by CT and grouped according to size: < 5, 5-10, and > 10 mm. When considering as true positives only nodules that were scored definitely visible, sensitivities for all nodules by tomosynthesis and PA radiography were 70% (+/- 5%) and 22% (+/- 4%), respectively, (p < 0.0001). Digital tomosynthesis showed significantly improved sensitivity of detection of known small lung nodules in all three size groups, when compared to PA chest radiography.

  5. Use of primary high-risk human papillomavirus testing for cervical cancer screening: interim clinical guidance.

    PubMed

    Huh, Warner K; Ault, Kevin A; Chelmow, David; Davey, Diane D; Goulart, Robert A; Garcia, Francisco A R; Kinney, Walter K; Massad, L Stewart; Mayeaux, Edward J; Saslow, Debbie; Schiffman, Mark; Wentzensen, Nicolas; Lawson, Herschel W; Einstein, Mark H

    2015-02-01

    In 2011, the American Cancer Society, the American Society for Colposcopy and Cervical Pathology, and the American Society for Clinical Pathology updated screening guidelines for the early detection of cervical cancer and its precursors. Recommended screening strategies were cytology or cotesting (cytology in combination with high-risk human papillomavirus [hrHPV] testing). These guidelines also addressed the use of hrHPV testing alone as a primary screening approach, which was not recommended for use at that time. There is now a growing body of evidence for screening with primary hrHPV testing, including a prospective U.S.-based registration study. Thirteen experts, including representatives from the Society of Gynecologic Oncology, the American Society for Colposcopy and Cervical Pathology, the American College of Obstetricians and Gynecologists, the American Cancer Society, the American Society of Cytopathology, the College of American Pathologists, and the American Society for Clinical Pathology, convened to provide interim guidance for primary hrHPV screening. This guidance panel was specifically triggered by an application to the U.S. Food and Drug Administration (FDA) for a currently marketed HPV test to be labeled for the additional indication of primary cervical cancer screening. Guidance was based on literature review and review of data from the FDA registration study, supplemented by expert opinion. This document aims to provide information for health care providers who are interested in primary hrHPV testing and an overview of the potential advantages and disadvantages of this strategy for screening as well as to highlight areas in need of further investigation.

  6. Latex and microsilica modified concrete bridge deck overlays in Oregon : interim report.

    DOT National Transportation Integrated Search

    1994-08-01

    This interim report presented information collected from 24 bridge deck overlays constructed in Oregon between 1989 and 1993. Decks were placed on a variety of existing structures using hydroblasting, milling and diamond grinding surface preparation....

  7. Autonomy Level Specification for Intelligent Autonomous Vehicles

    DTIC Science & Technology

    2003-09-01

    Autonomy Level Specification for Intelligent Autonomous Vehicles : Interim Progress Report Hui-Min Huang, Elena Messina, James Albus...Level Specification for Intelligent Autonomous Vehicles : Interim Progress Report 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6

  8. Interim Assessment of the VAL Automated Guideway Transit System.

    DOT National Transportation Integrated Search

    1981-11-01

    This report describes an interim assessment of the VAL (Vehicules Automatiques Legers or Light Automated Vehicle) AGT system which is currently under construction in Lille, France, and which is to become fully operational in December 1983. This repor...

  9. How to construct an optimal interim report: What the data monitoring committee does and doesn't need to know.

    PubMed

    Neaton, James D; Grund, Birgit; Wentworth, Deborah

    2018-03-01

    Data monitoring committees for randomized clinical trials have the responsibility of safeguarding interests of trial participants. To do so, the data monitoring committee must receive reports on safety and efficacy to assess risk/benefit and on trial conduct to ensure that the study can achieve its goals. This article outlines the key components of reports to the data monitoring committee and the important role of the unblinded statistician in preparing those reports. Most data monitoring committee meetings include open and closed sessions. For each session, there is a report of interim results. The open session is attended by the sponsor and lead investigators, including the statistician(s) responsible for the trial design. These investigators are blinded to the interim treatment comparisons. The closed session is attended by the data monitoring committee members and by the statistician(s) who prepared the closed report. These individuals are unblinded to interim treatment comparisons and therefore are not involved in study design changes. The optimal content of data monitoring committee reports and qualifications of the unblinded statistician(s) are discussed. Open reports should include responses to data monitoring committee recommendations, a synopsis of the protocol, a review of the protocol history and amendments, and information on enrollment, baseline characteristics, completeness of follow-up, and data quality. The open report is also a vehicle through which the sponsor and investigators should inform the data monitoring committee of relevant external information. Data in the open report are pooled over the treatment groups. The open report should not include data summaries by treatment group. The closed report should include a written summary with references to key tables and figures and methods used to prepare them. Tables and figures should summarize baseline characteristics, follow-up completeness, treatment adherence, and major safety and efficacy outcomes by treatment group. Text summaries should accompany the tables and figures. The data monitoring committee monitoring history (e.g. treatment differences at previous meetings) should be summarized. The unblinded statistician preparing the closed report should be familiar with the protocol and data collection plan and be capable of customizing the report to the current stage of the trial. This includes anticipating questions that may arise during the data monitoring committee review and pro-actively including data summaries to address these questions. There is considerable variation in the quality of open and closed data monitoring committee reports. Open and closed data monitoring committee reports should be concise, up to date, and informative. To achieve this, unblinded statisticians responsible for preparing closed data monitoring committee reports should be familiar with the statistical methods, the trial protocol, and the data collection plan. They should be capable of anticipating questions from the data monitoring committee and responding to requests for additional analyses.

  10. 78 FR 13016 - Certain Lined Paper Products From India: Notice of Partial Rescission of Countervailing Duty...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-26

    ... From India: Notice of Partial Rescission of Countervailing Duty Administrative Review; 2011 AGENCY... an administrative review of the countervailing duty order on certain lined paper products from India..., including its requests for both Navneet Publications (India) Ltd. (Navneet) and A.R. Printing & Packaging...

  11. 78 FR 2369 - Polyethylene Terephthalate Film, Sheet and Strip From India: Partial Rescission of Countervailing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-11

    ... Film, Sheet and Strip From India: Partial Rescission of Countervailing Duty Administrative Review; 2011... an administrative review of the countervailing duty (CVD) order on polyethylene terephthalate film...), SRF Limited (SRF), and Jindal Poly Films Limited of India (Jindal). The Department also received...

  12. Processing techniques for software based SAR processors

    NASA Technical Reports Server (NTRS)

    Leung, K.; Wu, C.

    1983-01-01

    Software SAR processing techniques defined to treat Shuttle Imaging Radar-B (SIR-B) data are reviewed. The algorithms are devised for the data processing procedure selection, SAR correlation function implementation, multiple array processors utilization, cornerturning, variable reference length azimuth processing, and range migration handling. The Interim Digital Processor (IDP) originally implemented for handling Seasat SAR data has been adapted for the SIR-B, and offers a resolution of 100 km using a processing procedure based on the Fast Fourier Transformation fast correlation approach. Peculiarities of the Seasat SAR data processing requirements are reviewed, along with modifications introduced for the SIR-B. An Advanced Digital SAR Processor (ADSP) is under development for use with the SIR-B in the 1986 time frame as an upgrade for the IDP, which will be in service in 1984-5.

  13. Fostering community understanding of sufficient benefit and early stopping for a phase 2B HIV prevention clinical trial in Africa.

    PubMed

    White, Rhonda; Chileshe, Modesta; Dawson, Liza; Donnell, Deborah; Hillier, Sharon; Morar, Neetha; Noguchi, Lisa; Dixon, Dennis

    2011-02-01

    Most trials of interventions are designed to address the traditional null hypothesis of no benefit. VOICE, a phase 2B HIV prevention trial funded by NIH and conducted in Africa, is designed to assess if the intervention will prevent a substantial fraction of infections. Planned interim analysis may provide conclusive evidence against the traditional null hypothesis without establishing substantial benefit. At this interim point, the Data and Safety Monitoring Board would then face the dilemma of knowing the product has some positive effect, but perhaps not as great an effect as the protocol has declared necessary. In March 2008, NIH program staff recommended that the VOICE protocol team discuss the stopping rules with stakeholders prior to initiating the protocol. The goals of the workshop were to inform community representatives about the potential ethical dilemma associated with stopping rules and engage in dialogue about these issues. We describe the resulting community consultation and summarize the outcomes. A 2-day workshop was convened with the goal of having a clear and transparent consultation with the stakeholders around the question, 'Given emerging evidence that a product could prevent some infections, would the community support a decision to continue accruing to the trial?' Participants included research staff and community stakeholders. Lectures with visual aids, discussions, and exercises using interactive learning tasks were used, with a focus on statistics and interpreting data from trials, particularly interim data. Results of oral and written evaluations by participants were reviewed. The feedback was mostly positive, with some residual confusion regarding statistical concepts. However, discussions with attendees later revealed that not all felt prepared to engage fully in the workshop. This was the presenters' first experience facilitating a formal discussion with an audience that had no advanced science, research, or mathematics training. Community representatives' concern regarding speaking for their communities without consulting them also created a challenge for the workshop. Open discussion around trial stopping rules requires that all discussants have an understanding of trial design concepts and feel a sense of empowerment to ask and answer questions. The VOICE CWG workshop was a first step toward the goal of open discussion regarding trial stopping rules and interim results for the study; however, ongoing education and dialogue must occur to ensure that all stakeholders fully participate in the process.

  14. Acoustic emission monitoring of steel bridge members : interim report.

    DOT National Transportation Integrated Search

    1995-01-01

    This interim report describes the current status of acoustic emission (AE) monitoring of steel bridge members. The report includes a brief introduction to the theory of acoustic emission and a comprehensive summary of previous efforts to apply AE mon...

  15. 33 CFR 385.38 - Interim goals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... (ii) Improvement in water quality; including: (A) Total phosphorus concentrations in the Everglades...) Increases in total spatial extent of restored wetlands; (B) Improvement in habitat quality; and (C... implementation process. In addition, interim goals will facilitate adaptive management and allow the Corps of...

  16. 16 CFR 1209.1 - Scope and application.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS INTERIM... part 1209, an interim consumer product safety standard, prescribes flame resistance and corrosiveness requirements for cellulose insulation that is a consumer product. These requirements are intended to reduce or...

  17. 16 CFR 1209.1 - Scope and application.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS INTERIM... part 1209, an interim consumer product safety standard, prescribes flame resistance and corrosiveness requirements for cellulose insulation that is a consumer product. These requirements are intended to reduce or...

  18. 16 CFR 1209.1 - Scope and application.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS INTERIM... part 1209, an interim consumer product safety standard, prescribes flame resistance and corrosiveness requirements for cellulose insulation that is a consumer product. These requirements are intended to reduce or...

  19. Determination of rainfall losses in Virginia, phase II : interim report.

    DOT National Transportation Integrated Search

    1981-01-01

    This interim report summarizes results obtained for the project through May 1981. The objective of the study is to develop rainfall loss parameters for localities in Virginia. For this purpose, the state has been divided into eleven hydrologic region...

  20. 75 FR 77733 - Federal Acquisition Regulation; Preventing Abuse of Interagency Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-13

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... Aeronautics and Space Administration (NASA). ACTION: Interim rule with request for comments. SUMMARY: The..., including economies and efficiencies and the ability to leverage resources. This interim rule, which...

Top