Knapp, F; Viechtbauer, W; Leonhart, R; Nitschke, K; Kaller, C P
2017-08-01
Despite a large body of research on planning performance in adult schizophrenia patients, results of individual studies are equivocal, suggesting either no, moderate or severe planning deficits. This meta-analysis therefore aimed to quantify planning deficits in schizophrenia and to examine potential sources of the heterogeneity seen in the literature. The meta-analysis comprised outcomes of planning accuracy of 1377 schizophrenia patients and 1477 healthy controls from 31 different studies which assessed planning performance using tower tasks such as the Tower of London, the Tower of Hanoi and the Stockings of Cambridge. A meta-regression analysis was applied to assess the influence of potential moderator variables (i.e. sociodemographic and clinical variables as well as task difficulty). The findings indeed demonstrated a planning deficit in schizophrenia patients (mean effect size: ; 95% confidence interval 0.56-0.78) that was moderated by task difficulty in terms of the minimum number of moves required for a solution. The results did not reveal any significant relationship between the extent of planning deficits and sociodemographic or clinical variables. The current results provide first meta-analytic evidence for the commonly assumed impairments of planning performance in schizophrenia. Deficits are more likely to become manifest in problem items with higher demands on planning ahead, which may at least partly explain the heterogeneity of previous findings. As only a small fraction of studies reported coherent information on sample characteristics, future meta-analyses would benefit from more systematic reports on those variables.
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Corridor Performance Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration. The ICM ...
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Corridor Performance Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM proje...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fuches, J.L.
1998-02-01
The Nuclear Regulatory Commission`s (NRC) strategic plan [NUREG-1614, Vol. 1, September 1997] establishes a strategic framework that will guide future decision-making and will help the NRC continue to meet its responsibility for protecting public health and safety, promoting the common defense and security, and protecting the environment. This performance plan complements the agency`s strategic plan by setting annual goals with measurable target levels of performance for FY 1999, as required by the Government Performance and Results Act. No significant contribution was made to the preparation of the performance plan by any non-Federal entity. However, a contractor was used to helpmore » facilitate discussions and resolution of issues. Within six months after the close of FY 1999, the NRC will submit to the President and the Congress a report on program performance for FY 1999. This performance report will review the success of the agency in achieving the performance goals established for FY 1999. Where those goals have been achieved, the underlying assumptions and strategies will be examined to ensure that continued applicability is warranted in the future. If any of the FY 1999 performance goals are not met, the agency will conduct a thorough analysis of why it did not meet the goal and the actions necessary to meet-the goal in the future. One result of this analysis will be the documentation of plans and schedules for achieving the established performance goal. If the analysis should indicate that the performance goal is impractical or infeasible, the performance report will document why that is the case and what action is recommended.« less
A Multifaceted Approach to Investigating Pre-Task Planning Effects on Paired Oral Test Performance
ERIC Educational Resources Information Center
Nitta, Ryo; Nakatsuhara, Fumiyo
2014-01-01
Despite the growing popularity of paired format speaking assessments, the effects of pre-task planning time on performance in these formats are not yet well understood. For example, some studies have revealed the benefits of planning but others have not. Using a multifaceted approach including analysis of the process of speaking performance, the…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tateoka, K; Graduate School of Medicine, Sapporo Medical University, Sapporo, JP; Fujimomo, K
2014-06-01
Purpose: The aim of the study is to evaluate the use of Varian DynaLog files to verify VMAT plans delivery and modulation complexity score (MCS) of VMAT. Methods: Delivery accuracy of machine performance was quantified by multileaf collimator (MLC) position errors, gantry angle errors and fluence delivery accuracy for volumetric modulated arc therapy (VMAT). The relationship between machine performance and plan complexity were also investigated using the modulation complexity score (MCS). Plan and Actual MLC positions, gantry angles and delivered fraction of monitor units were extracted from Varian DynaLog files. These factors were taken from the record and verify systemmore » of MLC control file. Planned and delivered beam data were compared to determine leaf position errors and gantry angle errors. Analysis was also performed on planned and actual fluence maps reconstructed from those of the DynaLog files. This analysis was performed for all treatment fractions of 5 prostate VMAT plans. The analysis of DynaLog files have been carried out by in-house programming in Visual C++. Results: The root mean square of leaf position and gantry angle errors were about 0.12 and 0.15, respectively. The Gamma of planned and actual fluence maps at 3%/3 mm criterion was about 99.21. The gamma of the leaf position errors were not directly related to plan complexity as determined by the MCS. Therefore, the gamma of the gantry angle errors were directly related to plan complexity as determined by the MCS. Conclusion: This study shows Varian dynalog files for VMAT plan can be diagnosed delivery errors not possible with phantom based quality assurance. Furthermore, the MCS of VMAT plan can evaluate delivery accuracy for patients receiving of VMAT. Machine performance was found to be directly related to plan complexity but this is not the dominant determinant of delivery accuracy.« less
NASA Technical Reports Server (NTRS)
Wells, C.; Kolkhorst, H. E.
1971-01-01
The consumables analysis was performed for the Skylab 2, 3, and 4 Preliminary Reference Interim Revision Flight Plan. The analysis and the results are based on the mission requirements as specified in the flight plan and on other available data. The results indicate that the consumables requirements for the Skylab missions allow for remaining margins (percent) of oxygen, nitrogen, and water nominal as follows: 83.5, 90.8, and 88.7 for mission SL-2; 57.1, 64.1, and 67.3 for SL-3; and 30.8, 44.3, and 46.5 for SL-4. Performance of experiment M509 as scheduled in the flight plan results in venting overboard the cluster atmosphere. This is due to the addition of nitrogen for propulsion and to the additional oxygen introduced into the cabin when the experiment is performed with the crewman suited.
Analysis of Workplace Health Education Performed by Occupational Health Managers in Korea.
Kim, Yeon-Ha; Jung, Moon-Hee
2016-09-01
To evaluate workplace health education as practiced by occupational health managers based on standardized job tasks and suggest priority tasks and areas to be trained. The study was conducted between November 10, 2013 and April 30, 2014. The tool used in this study was standardized job tasks of workplace health education for occupational health managers which was developed through methodological steps. It was evaluated by 233 worksite occupational health managers. Data were analyzed using SPSS 21.0. Predicting variables of workplace health education performance were the "analysis and planning" factor, type of enterprise, and form of management. Healthcare professionals and occupational health managers who managed the nonmanufacturing industry showed high importance and low performance level in "analysis and planning" factor. "Analysis and planning" skill is priority training area for healthcare professionals and occupational health managers who managed nonmanufacturing industry. It is necessary to develop a training curriculum for occupational health managers that include improving analysis of worksites and plans for a health education program. Copyright © 2016. Published by Elsevier B.V.
Research notes : transportation planning performance measures.
DOT National Transportation Integrated Search
2006-06-01
Performance measurement can be defined as an assessment of progress toward goals. In transportation planning a good measure is clearly defined, is acceptable to stakeholders, allows for economical data collection and analysis, shows how well th...
SU-F-T-295: MLCs Performance and Patient-Specific IMRT QA Using Log File Analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Osman, A; American University of Biuret Medical Center, Biuret; Maalej, N
2016-06-15
Purpose: To analyze the performance of the multi-leaf collimators (MLCs) from the log files recorded during the intensity modulated radiotherapy (IMRT) treatment and to construct the relative fluence maps and do the gamma analysis to compare the planned and executed MLCs movement. Methods: We developed a program to extract and analyze the data from dynamic log files (dynalog files) generated from sliding window IMRT delivery treatments. The program extracts the planned and executed (actual or delivered) MLCs movement, calculates and compares the relative planned and executed fluences. The fluence maps were used to perform the gamma analysis (with 3% dosemore » difference and 3 mm distance to agreement) for 3 IMR patients. We compared our gamma analysis results with those obtained from portal dose image prediction (PDIP) algorithm performed using the EPID. Results: For 3 different IMRT patient treatments, the maximum difference between the planned and the executed MCLs positions was 1.2 mm. The gamma analysis results of the planned and delivered fluences were in good agreement with the gamma analysis from portal dosimetry. The maximum difference for number of pixels passing the gamma criteria (3%/3mm) was 0.19% with respect to portal dosimetry results. Conclusion: MLC log files can be used to verify the performance of the MLCs. Patientspecific IMRT QA based on MLC movement log files gives similar results to EPID dosimetry results. This promising method for patient-specific IMRT QA is fast, does not require dose measurements in a phantom, can be done before the treatment and for every fraction, and significantly reduces the IMRT workload. The author would like to thank King Fahd University of petroleum and Minerals for the support.« less
Planning for Downtown Circulation Systems. Volume 2. Analysis Techniques.
DOT National Transportation Integrated Search
1983-10-01
This volume contains the analysis and refinement stages of downtown circulator planning. Included are sections on methods for estimating patronage, costs, revenues, and impacts, and a section on methods for performing micro-level analyses.
40 CFR 60.2899 - What is a waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Preconstruction Siting Analysis Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...
40 CFR 60.2899 - What is a waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Preconstruction Siting Analysis Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...
ERIC Educational Resources Information Center
Bessemer, David W.; Shrage, Jules H.
Recommendations for an alternative plan, based on typological analysis techniques, for the evaluation of student characteristics related to media, presentation design, and academic performance are presented. Difficulties with present evaluation plans are discussed, and different methods of typological analysis are described. Included are…
Individual Differences in Planning Processes.
1980-06-01
prescriptive guidelines for improving planning. The research focuses on the analysis of thinking-aloud proto- cols produced by five subjects as they performed a...planning. ICURITV CLAI, PICA’IOw of il PAogemben Do&l abwr . --- ...... - iii - PREFACE This Note describes an analysis of "think-aloud" protocols gen...a conceptual framework for the analysis . The model specifies a Dumber of decision categories that could be matched to sub- jects’ descriptions of
Impact of sentinel lymph node biopsy on immediate breast reconstruction after mastectomy.
Wood, Benjamin C; David, Lisa R; Defranzo, Anthony J; Stewart, John H; Shen, Perry; Geisinger, Kim R; Marks, Malcolm W; Levine, Edward A
2009-07-01
Traditionally, sentinel lymph node biopsy (SLNB) is performed at the time of mastectomy and reconstruction. However, several groups have advocated SLNB as a separate outpatient procedure before mastectomy, when immediate reconstruction is planned, to allow for complete pathologic evaluation. The purpose of this study was to determine the impact of intraoperative analysis of SLNB on the reconstructive plan when performed at the same time as definitive surgery. A retrospective review was conducted of all mastectomy cases performed at a single institution between September 1998 and November 2007. Of the 747 mastectomy cases reviewed, SLNB was conducted in 344 cases, and there was immediate breast reconstruction in 193 of those cases. There were 27 (7.8%) false negative and three (0.9%) false positive intraoperative analysis of SLNB. Touch preparation analysis from the SLNB changed the reconstructive plan in four (2.1%) cases. In our experience, SLNB can be performed at the time of mastectomy with minimal impact on the reconstructive plan. A staged approach incurs significant additional expense, increases the delay in initiation of systemic therapy and the propensity of procedure-related morbidity; therefore, SLNB should not be performed as a separate procedure before definitive surgery with immediate breast reconstruction.
U.S. Army Aviator Job Analysis
2006-08-01
Differences by Airframe AH-64D CH-47 OH-58 UH-60 Task M SD M SD M SD M SD Plan IFR flight 3.56 1.25 3.41 1.15 2.00 1.43 4.07 .84 Perform aircraft...1.64 3.13 1.36 night systems Perform flight navigation by dead 3.91 .98 3.86 1.03 3.29 1.07 4.06 .87 reckoning Perform appropriate IFR approach 3.67...2. Check status of aircraft @ (D () T 3. Plan VFR flight T (Z 3 e 4. Plan IFR flight @ T 0 3 e 5. Perform tactical flight mission planning using the
Market and plan characteristics related to HMO quality and improvement.
Scanlon, Dennis P; Swaminathan, Shailender; Chernew, Michael; Lee, Woolton
2006-12-01
Existing research on health plan performance examines whether variation in plans' scores is related to enrollee and health plan traits, primarily using cross-sectional research designs. This study extends that literature by incorporating data on market characteristics using a longitudinal framework. We estimate multivariate growth models that relate plan performance on standard measures to market and HMO characteristics using an unbalanced panel of data for 1998 to 2002. We find that HMO competition is not associated with better performance or greater rates of improvement in performance on the HEDIS chronic care measures. HMO penetration, on the other hand, is positively associated with HEDIS performance in several of the chronic care process-and-outcomes measures but not with a greater rate of improvement through time. Our analysis indicates that a significant percentage of the unexplained variation in quality improvement is because of permanent, unobserved plan-level characteristics that future research should strive to identify.
Foundation for the Future. 2013-2015 Strategic Plan. FY13 Organizational Performance Plan
2013-01-01
Strengths, Weaknesses, Opportunities, and Threats ( SWOT ) Analysis 192013–2015 Strategic Plan tr t ic l The Planning, Policy, and Leadership Support (PPLS...participation of faculty and staff from across the University in this review. The review process begins with an analysis of organizational strengths...weaknesses, opportunities, and threats ( SWOT ). (The results of the SWOT are shown on page 18.) This is based on an environmental scan which identifi
Transmission Planning Analysis Tool
DOE Office of Scientific and Technical Information (OSTI.GOV)
2015-06-23
Developed to solve specific problem: Assist transmission planning for regional transfers in interconnected power systems. This work was originated in a study for the U.S. Department of State, to recommend transmission reinforcements for the Central American regional system that interconnects 6 countries. Transmission planning analysis is currently performed by engineers with domainspecific and systemspecific knowledge without a unique methodology. The software codes of this disclosure assists engineers by defining systematic analysis procedures to help identify weak points and make decisions on transmission planning of regional interconnected power systems. Transmission Planning Analysis Tool groups PSS/E results of multiple AC contingency analysismore » and voltage stability analysis and QV analysis of many scenarios of study and arrange them in a systematic way to aid power system planning engineers or transmission operators in effective decision]making process or in the off]line study environment.« less
DOT National Transportation Integrated Search
2009-12-22
This document presents the University of Michigan Transportation Research Institutes plan to : perform analysis of data collected from the light vehicle platform field operational test of the : Integrated Vehicle-Based Safety Systems (IVBSS) progr...
DOT National Transportation Integrated Search
2009-11-23
This document presents the University of Michigan Transportation Research Institutes plan to perform : analysis of data collected from the heavy truck platform field operational test of the Integrated Vehicle- : Based Safety Systems (IVBSS) progra...
Moertl, Peter M; Canning, John M; Gronlund, Scott D; Dougherty, Michael R P; Johansson, Joakim; Mills, Scott H
2002-01-01
Prior research examined how controllers plan in their traditional environment and identified various information uncertainties as detriments to planning. A planning aid was designed to reduce this uncertainty by perceptually representing important constraints. This included integrating spatial information on the radar screen with discrete information (planned sequences of air traffic). Previous research reported improved planning performance and decreased workload in the planning aid condition. The purpose of this paper was to determine the source of these performance improvements. Analysis of computer interactions using log-linear modeling showed that the planning interface led to less repetitive--but more integrated--information retrieval compared with the traditional planning environment. Ecological interface design principles helped explain how the integrated information retrieval gave rise to the performance improvements. Actual or potential applications of this research include the design and evaluation of interface automation that keeps users in active control by modification of perceptual task characteristics.
FY 1987 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less
Born, Patricia H; Query, J Tim
2004-01-01
Growing public interest in the operations of managed care plans has fueled a variety of activities to collect and analyze their performance. These activities include studies of financial performance, analysis of enrollment decisions, and, more recently, the development of systems for measuring healthcare quality to improve accountability to consumers. In this study, the authors focus on the activities of managed care plans that may frustrate patients and providers and, subsequently, motivate patients to file complaints. Using data from three sources, they evaluate the relationships between complaints against managed care plans and two metrics of performance: (a) the financial performance of the plan, and (b) the quality of care provided. Their findings indicate that complaints against health maintenance organizations are significantly related to the plans' levels of quality and to actions that may impede access to care.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zaininger, H.W.
1998-08-01
This report describes the results of an analysis to determine the economic and operational value of battery storage to wind and photovoltaic (PV) generation technologies to the Sacramento Municipal Utility District (SMUD) system. The analysis approach consisted of performing a benefit-cost economic assessment using established SMUD financial parameters, system expansion plans, and current system operating procedures. This report presents the results of the analysis. Section 2 describes expected wind and PV plant performance. Section 3 describes expected benefits to SMUD associated with employing battery storage. Section 4 presents preliminary benefit-cost results for battery storage added at the Solano wind plantmore » and the Hedge PV plant. Section 5 presents conclusions and recommendations resulting from this analysis. The results of this analysis should be reviewed subject to the following caveat. The assumptions and data used in developing these results were based on reports available from and interaction with appropriate SMUD operating, planning, and design personnel in 1994 and early 1995 and are compatible with financial assumptions and system expansion plans as of that time. Assumptions and SMUD expansion plans have changed since then. In particular, SMUD did not install the additional 45 MW of wind that was planned for 1996. Current SMUD expansion plans and assumptions should be obtained from appropriate SMUD personnel.« less
NASA Technical Reports Server (NTRS)
Hen, Itay; Rieffel, Eleanor G.; Do, Minh; Venturelli, Davide
2014-01-01
There are two common ways to evaluate algorithms: performance on benchmark problems derived from real applications and analysis of performance on parametrized families of problems. The two approaches complement each other, each having its advantages and disadvantages. The planning community has concentrated on the first approach, with few ways of generating parametrized families of hard problems known prior to this work. Our group's main interest is in comparing approaches to solving planning problems using a novel type of computational device - a quantum annealer - to existing state-of-the-art planning algorithms. Because only small-scale quantum annealers are available, we must compare on small problem sizes. Small problems are primarily useful for comparison only if they are instances of parametrized families of problems for which scaling analysis can be done. In this technical report, we discuss our approach to the generation of hard planning problems from classes of well-studied NP-complete problems that map naturally to planning problems or to aspects of planning problems that many practical planning problems share. These problem classes exhibit a phase transition between easy-to-solve and easy-to-show-unsolvable planning problems. The parametrized families of hard planning problems lie at the phase transition. The exponential scaling of hardness with problem size is apparent in these families even at very small problem sizes, thus enabling us to characterize even very small problems as hard. The families we developed will prove generally useful to the planning community in analyzing the performance of planning algorithms, providing a complementary approach to existing evaluation methods. We illustrate the hardness of these problems and their scaling with results on four state-of-the-art planners, observing significant differences between these planners on these problem families. Finally, we describe two general, and quite different, mappings of planning problems to QUBOs, the form of input required for a quantum annealing machine such as the D-Wave II.
Koppenol-Gonzalez, Gabriela V; Bouwmeester, Samantha; Boonstra, A Marije
2010-12-01
The Tower of London (TOL) is a widely used instrument for assessing planning ability. Inhibition and (spatial) working memory are assumed to contribute to performance on the TOL, but findings about the relationship between these cognitive processes are often inconsistent. Moreover, the influence of specific properties of TOL problems on cognitive processes and difficulty level is often not taken into account. Furthermore, it may be expected that several planning strategies can be distinguished that cannot be extracted from the total score. In this study, a factor analysis and a latent class regression analysis were performed to address these issues. The results showed that 4 strategy groups that differed with respect to preplanning time could be distinguished. The effect of problem properties also differed for the 4 groups. Additional analyses showed that the groups differed on average planning performance but that there were no significant differences between inhibition and spatial working memory performance. Finally, it seemed that multiple factors influence performance on the TOL, the most important ones being the score measurements, the problem properties, and strategy use.
Application of mobile digital communications in law enforcement, an introductory planning guide
NASA Technical Reports Server (NTRS)
Sohn, R. L.; Abraham, J. E.; Leflang, W. G.; Kennedy, R. D.; Wilson, J. H.; Gurfield, R. M.
1975-01-01
A set of planning guidelines for the application of digital communications techniques to law enforcement use is presented. Some essential characteristics of digital techniques and their applications are outlined, as are some principles of system analysis, evaluation, and planning. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with respect to this application problem. Information on law enforcement digital communications systems and equipment and a list of vendor sources are given in appendices.
2018-01-01
Defense Planning in a Time of Conflict A Comparative Analysis of the 2001– 2014 Quadrennial Defense Reviews, and Implications for...The purpose of the project was to perform a comparative historical review of the four Quadrennial Defense Reviews (QDRs) conducted since the first...Planning in a Time of Conflict: A Comparative Analysis of the 2001–2014 Quadrennial Defense Reviews, and Implications for the Army—that documented
Incipient fault detection study for advanced spacecraft systems
NASA Technical Reports Server (NTRS)
Milner, G. Martin; Black, Michael C.; Hovenga, J. Mike; Mcclure, Paul F.
1986-01-01
A feasibility study to investigate the application of vibration monitoring to the rotating machinery of planned NASA advanced spacecraft components is described. Factors investigated include: (1) special problems associated with small, high RPM machines; (2) application across multiple component types; (3) microgravity; (4) multiple fault types; (5) eight different analysis techniques including signature analysis, high frequency demodulation, cepstrum, clustering, amplitude analysis, and pattern recognition are compared; and (6) small sample statistical analysis is used to compare performance by computation of probability of detection and false alarm for an ensemble of repeated baseline and faulted tests. Both detection and classification performance are quantified. Vibration monitoring is shown to be an effective means of detecting the most important problem types for small, high RPM fans and pumps typical of those planned for the advanced spacecraft. A preliminary monitoring system design and implementation plan is presented.
Improve strategic supplier performance using DMAIC to develop a Quality Improvement Plan
NASA Astrophysics Data System (ADS)
Jardim, Kevin P.
Supplier performance that meets the requirements of the customer has long plagued quality professionals. Despite the vast efforts by organizations to improve supplier performance, little has been done to standardize the plan to improve performance. This project presents a guideline and problem-solving strategy using a Define, Measure, Analyze, Improve, and Control (DMAIC) structured tool that will assist in the management and improvement of supplier performance. An analysis of benchmarked Quality Improvement Plans indicated that this topic needs more focus on how to accomplish improved supplier performance. This project is part of a growing body of supplier continuous improvement efforts. With the input of Zodiac Aerospace quality professionals this project's results provide a solution to Quality Improvement Plans and show objective evidence of its benefits. This project contributes to the future research on similar topics.
NASA Technical Reports Server (NTRS)
Tahmasebi, Farhad; Pearce, Robert
2016-01-01
Description of a tool for portfolio analysis of NASA's Aeronautics research progress toward planned community strategic Outcomes is presented. The strategic planning process for determining the community Outcomes is also briefly described. Stakeholder buy-in, partnership performance, progress of supporting Technical Challenges, and enablement forecast are used as the criteria for evaluating progress toward Outcomes. A few illustrative examples are also presented.
Borba, Alexandre Meireles; Haupt, Dustin; de Almeida Romualdo, Leiliane Teresinha; da Silva, André Luis Fernandes; da Graça Naclério-Homem, Maria; Miloro, Michael
2016-09-01
Virtual surgical planning (VSP) has become routine practice in orthognathic treatment planning; however, most surgeons do not perform the planning without technical assistance, nor do they routinely evaluate the accuracy of the postoperative outcomes. The purpose of the present study was to propose a reproducible method that would allow surgeons to have an improved understanding of VSP orthognathic planning and to compare the planned surgical movements with the results obtained. A retrospective cohort of bimaxillary orthognathic surgery cases was used to evaluate the variability between the predicted and obtained movements using craniofacial landmarks and McNamara 3-dimensional cephalometric analysis from computed tomography scans. The demographic data (age, gender, and skeletal deformity type) were gathered from the medical records. The data analysis included the level of variability from the predicted to obtained surgical movements as assessed by the mean and standard deviation. For the overall sample, statistical analysis was performed using the 1-sample t test. The statistical analysis between the Class II and III patient groups used an unpaired t test. The study sample consisted of 50 patients who had undergone bimaxillary orthognathic surgery. The overall evaluation of the mean values revealed a discrepancy between the predicted and obtained values of less than 2.0 ± 2.0 mm for all maxillary landmarks, although some mandibular landmarks were greater than this value. An evaluation of the influence of gender and deformity type on the accuracy of surgical movements did not demonstrate statistical significance for most landmarks (P > .05). The method provides a reproducible tool for surgeons who use orthognathic VSP to perform routine evaluation of the postoperative outcomes, permitting the identification of specific variables that could assist in improving the accuracy of surgical planning and execution. Copyright © 2016 American Association of Oral and Maxillofacial Surgeons. Published by Elsevier Inc. All rights reserved.
IAC level "O" program development
NASA Technical Reports Server (NTRS)
Vos, R. G.
1982-01-01
The current status of the IAC development activity is summarized. The listed prototype software and documentation was delivered, and details were planned for development of the level 1 operational system. The planned end product IAC is required to support LSST design analysis and performance evaluation, with emphasis on the coupling of required technical disciplines. The long term IAC effectively provides two distinct features: a specific set of analysis modules (thermal, structural, controls, antenna radiation performance and instrument optical performance) that will function together with the IAC supporting software in an integrated and user friendly manner; and a general framework whereby new analysis modules can readily be incorporated into IAC or be allowed to communicate with it.
Planning for Organization Development in Operations Control Centers
2012-06-01
their perseverance in review- ing hundreds of hours of recorded discussions to provide quantitative data for our analysis . v CONTENTS PLANNING FOR...service certifications Performing predictive analysis and intervention 2 coordination between the OCCs and other CCs. There was also a... analysis was conducted by expert review of the transcripts. Specifically, the first author of this report read each transcript, noting critical
Simpson, John; Raith, Andrea; Rouse, Paul; Ehrgott, Matthias
2017-10-09
Purpose The operations research method of data envelopment analysis (DEA) shows promise for assessing radiotherapy treatment plan quality. The purpose of this paper is to consider the technical requirements for using DEA for plan assessment. Design/methodology/approach In total, 41 prostate treatment plans were retrospectively analysed using the DEA method. The authors investigate the impact of DEA weight restrictions with reference to the ability to differentiate plan performance at a level of clinical significance. Patient geometry influences plan quality and the authors compare differing approaches for managing patient geometry within the DEA method. Findings The input-oriented DEA method is the method of choice when performing plan analysis using the key undesirable plan metrics as the DEA inputs. When considering multiple inputs, it is necessary to constrain the DEA input weights in order to identify potential plan improvements at a level of clinical significance. All tested approaches for the consideration of patient geometry yielded consistent results. Research limitations/implications This work is based on prostate plans and individual recommendations would therefore need to be validated for other treatment sites. Notwithstanding, the method that requires both optimised DEA weights according to clinical significance and appropriate accounting for patient geometric factors is universally applicable. Practical implications DEA can potentially be used during treatment plan development to guide the planning process or alternatively used retrospectively for treatment plan quality audit. Social implications DEA is independent of the planning system platform and therefore has the potential to be used for multi-institutional quality audit. Originality/value To the authors' knowledge, this is the first published examination of the optimal approach in the use of DEA for radiotherapy treatment plan assessment.
A Review of Strategic Mobility Models and Analysis
1991-01-01
Logistics Directorate of the Joint Staff, (JS-J-4) specifically by the Studies , Concepts, and Analysis Division (SCAD), which conducts long-range...their analysis objec- tives. This study was designed to assist the Logistics Directorate of the Joint Staff (JS/J-4) to understand and improve the...This study concentrated on resource planning, which is the type of planning performed by the Logistics Directorate’s Studies , Concepts, and Analysis
Engaging the Workforce - 12347
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gaden, Michael D.; Wastren Advantage Inc.
2012-07-01
Likert, Covey, and a number of others studying and researching highly effective organizations have found that performing functions such as problem-solving, decision-making, safety analysis, planning, and continuous improvement as close to the working floor level as possible results in greater buy-in, feelings of ownership by the workers, and more effective use of resources. Empowering the workforce does several things: 1) people put more effort and thought into work for which they feel ownership, 2) the information they use for planning, analysis, problem-solving,and decision-making is more accurate, 3) these functions are performed in a more timely manner, and 4) the resultsmore » of these functions have more credibility with those who must implement them. This act of delegation and empowerment also allows management more time to perform functions they are uniquely trained and qualified to perform, such as strategic planning, staff development, succession planning, and organizational improvement. To achieve this state in an organization, however, requires a very open, transparent culture in which accurate, timely, relevant, candid, and inoffensive communication flourishes, a situation that does not currently exist in a majority of organizations. (authors)« less
Linking Science Analysis with Observation Planning: A Full Circle Data Lifecycle
NASA Technical Reports Server (NTRS)
Grosvenor, Sandy; Jones, Jeremy; Koratkar, Anuradha; Li, Connie; Mackey, Jennifer; Neher, Ken; Wolf, Karl; Obenschain, Arthur F. (Technical Monitor)
2001-01-01
A clear goal of the Virtual Observatory (VO) is to enable new science through analysis of integrated astronomical archives. An additional and powerful possibility of the VO is to link and integrate these new analyses with planning of new observations. By providing tools that can be used for observation planning in the VO, the VO will allow the data lifecycle to come full circle: from theory to observations to data and back around to new theories and new observations. The Scientist's Expert Assistant (SEA) Simulation Facility (SSF) is working to combine the ability to access existing archives with the ability to model and visualize new observations. Integrating the two will allow astronomers to better use the integrated archives of the VO to plan and predict the success of potential new observations more efficiently, The full circle lifecycle enabled by SEA can allow astronomers to make substantial leaps in the quality of data and science returns on new observations. Our paper examines the exciting potential of integrating archival analysis with new observation planning, such as performing data calibration analysis on archival images and using that analysis to predict the success of new observations, or performing dynamic signal-to-noise analysis combining historical results with modeling of new instruments or targets. We will also describe how the development of the SSF is progressing and what have been its successes and challenges.
Linking Science Analysis with Observation Planning: A Full Circle Data Lifecycle
NASA Technical Reports Server (NTRS)
Jones, Jeremy; Grosvenor, Sandy; Wolf, Karl; Li, Connie; Koratkar, Anuradha; Powers, Edward I. (Technical Monitor)
2001-01-01
A clear goal of the Virtual Observatory (VO) is to enable new science through analysis of integrated astronomical archives. An additional and powerful possibility of the VO is to link and integrate these new analyses with planning of new observations. By providing tools that can be used for observation planning in the VO, the VO will allow the data lifecycle to come full circle: from theory to observations to data and back around to new theories and new observations. The Scientist's Expert Assistant (SEA) Simulation Facility (SSF) is working to combine the ability to access existing archives with the ability to model and visualize new observations. Integrating the two will allow astronomers to better use the integrated archives of the VO to plan and predict the success of potential new observations. The full circle lifecycle enabled by SEA can allow astronomers to make substantial leaps in the quality of data and science returns on new observations. Our paper will examine the exciting potential of integrating archival analysis with new observation planning, such as performing data calibration analysis on archival images and using that analysis to predict the success of new observations, or performing dynamic signal-to-noise analysis combining historical results with modeling of new instruments or targets. We will also describe how the development of the SSF is progressing and what has been its successes and challenges.
NASA Technical Reports Server (NTRS)
Campbell, B. H.
1974-01-01
A study is described which was initiated to identify and quantify the interrelationships between and within the performance, safety, cost, and schedule parameters for unmanned, automated payload programs. The result of the investigation was a systems cost/performance model which was implemented as a digital computer program and could be used to perform initial program planning, cost/performance tradeoffs, and sensitivity analyses for mission model and advanced payload studies. Program objectives and results are described briefly.
77 FR 20474 - Delegation of Authority; Delegation of Authority No. 24 to the Chief Operating Officer
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-04
... and performance planning, measurement, analysis, assessment of progress, and use of performance...; long- range budgeting and accounting; hiring and training employees; modernizing information technology..., measurement, analysis, regular assessment of progress and the use of performance information to improve...
ERIC Educational Resources Information Center
Roumell, Elizabeth Anne; Salajan, Florin Daniel
2016-01-01
The purpose of this study was threefold: to expand on existing reviews of 20 years of educational technology policy in the United States, to perform an empirical content analysis of the four National Education Technology Plan (NETP) documents issued by the Department of Education since 1996, and to provide a dialectic analysis of the evolution of…
NASA Technical Reports Server (NTRS)
Schlagheck, R. A.
1977-01-01
New planning techniques and supporting computer tools are needed for the optimization of resources and costs for space transportation and payload systems. Heavy emphasis on cost effective utilization of resources has caused NASA program planners to look at the impact of various independent variables that affect procurement buying. A description is presented of a category of resource planning which deals with Spacelab inventory procurement analysis. Spacelab is a joint payload project between NASA and the European Space Agency and will be flown aboard the Space Shuttle starting in 1980. In order to respond rapidly to the various procurement planning exercises, a system was built that could perform resource analysis in a quick and efficient manner. This system is known as the Interactive Resource Utilization Program (IRUP). Attention is given to aspects of problem definition, an IRUP system description, questions of data base entry, the approach used for project scheduling, and problems of resource allocation.
Nott, Melissa T; Chapparo, Christine
2008-09-01
Agitation following traumatic brain injury is characterised by a heightened state of activity with disorganised information processing that interferes with learning and achieving functional goals. This study aimed to identify information processing problems during task performance of a severely agitated adult using the Perceive, Recall, Plan and Perform (PRPP) System of Task Analysis. Second, this study aimed to examine the sensitivity of the PRPP System to changes in task performance over a short period of rehabilitation, and third, to evaluate the guidance provided by the PRPP in directing intervention. A case study research design was employed. The PRPP System of Task Analysis was used to assess changes in task embedded information processing capacity during occupational therapy intervention with a severely agitated adult in a rehabilitation context. Performance is assessed on three selected tasks over a one-month period. Information processing difficulties during task performance can be clearly identified when observing a severely agitated adult following a traumatic brain injury. Processing skills involving attention, sensory processing and planning were most affected at this stage of rehabilitation. These processing difficulties are linked to established descriptions of agitated behaviour. Fluctuations in performance across three tasks of differing processing complexity were evident, leading to hypothesised relationships between task complexity, environment and novelty with information processing errors. Changes in specific information processing capacity over time were evident based on repeated measures using the PRPP System of Task Analysis. This lends preliminary support for its utility as an outcome measure, and raises hypotheses about the type of therapy required to enhance information processing in people with severe agitation. The PRPP System is sensitive to information processing changes in severely agitated adults when used to reassess performance over short intervals and can provide direct guidance to occupational therapy intervention to improve task embedded information processing by categorising errors under four stages of an information processing model: Perceive, Recall, Plan and Perform.
16 CFR 1000.19 - Office of Financial Management, Planning and Evaluation.
Code of Federal Regulations, 2010 CFR
2010-01-01
...; analysis of major policy and operational issues; performing evaluations and management studies of... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Office of Financial Management, Planning and... COMMISSION ORGANIZATION AND FUNCTIONS § 1000.19 Office of Financial Management, Planning and Evaluation. The...
ERIC Educational Resources Information Center
Mills, Caroline; Chapparo, Christine
2017-01-01
The aim of this study was to determine the impact of a classroom sensory activity schedule (SAS) on cognitive strategy use during task performance. This work studies a single-system AB research design with seven students with autism and intellectual disability. Repeated measures using the Perceive, Recall, Plan and Perform (PRPP) Cognitive Task…
Performance Indicators in Math: Implications for Brief Experimental Analysis of Academic Performance
ERIC Educational Resources Information Center
VanDerheyden, Amanda M.; Burns, Matthew K.
2009-01-01
Brief experimental analysis (BEA) can be used to specify intervention characteristics that produce positive learning gains for individual students. A key challenge to the use of BEA for intervention planning is the identification of performance indicators (including topography of the skill, measurement characteristics, and decision criteria) that…
Inpatient Dialysis Unit Project Development: Redesigning Acute Hemodialysis Care.
Day, Jennifer
2017-01-01
Executive leaders of an acute care hospital performed a market and financial analysis, and created a business plan to establish an inpatient hemodialysis unit operated by the hospital to provide safe, high-quality, evidence-based care to the population of individuals experiencing end stage renal disease (ESRD) within the community. The business plan included a SWOT (Strengths - Weaknesses - Opportunities - Threats) analysis to assess advantages of the hospital providing inpatient hemodialysis services versus outsourcing the services with a contracted agency. The results of the project were a newly constructed tandem hemodialysis room and an operational plan with clearly defined key performance indicators, process improvement initiatives, and financial goals. This article provides an overview of essential components of a business plan to guide the establishment of an inpatient hemodialysis unit. Copyright© by the American Nephrology Nurses Association.
RH-LLW Disposal Facility Project CD-2/3 to Design/Build Proposal Reconciliation Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Annette L. Schafer
2012-06-01
A reconciliation plan was developed and implemented to address potential gaps and responses to gaps between the design/build vendor proposals and the Critical Decision-2/3 approval request package for the Remote-Handled Low Level Waste Disposal Facility Project. The plan and results of the plan implementation included development of a reconciliation team comprised of subject matter experts from Battelle Energy Alliance and the Department of Energy Idaho Operations Office, identification of reconciliation questions, reconciliation by the team, identification of unresolved/remaining issues, and identification of follow-up actions and subsequent approvals of responses. The plan addressed the potential for gaps to exist in themore » following areas: • Department of Energy Order 435.1, “Radioactive Waste Management,” requirements, including the performance assessment, composite analysis, monitoring plan, performance assessment/composite analysis maintenance plan, and closure plan • Environmental assessment supporting the National Environmental Policy Act • Nuclear safety • Safeguards and security • Emplacement operations • Requirements for commissioning • General project implementation. The reconciliation plan and results of the plan implementation are provided in a business-sensitive project file. This report provides the reconciliation plan and non-business sensitive summary responses to identified gaps.« less
Cost accounting, management control, and planning in health care.
Siegrist, R B; Blish, C S
1988-02-01
Advantages and pharmacy applications of computerized hospital management-control and planning systems are described. Hospitals must define their product lines; patient cases, not tests or procedures, are the end product. Management involves operational control, management control, and strategic planning. Operational control deals with day-to-day management on the task level. Management control involves ensuring that managers use resources effectively and efficiently to accomplish the organization's objectives. Management control includes both control of unit costs of intermediate products, which are procedures and services used to treat patients and are managed by hospital department heads, and control of intermediate product use per case (managed by the clinician). Information from the operation and management levels feeds into the strategic plan; conversely, the management level controls the plan and the operational level carries it out. In the system developed at New England Medical Center, Boston, Massachusetts, the intermediate product-management system enables managers to identify intermediate products, develop standard costs, simulate changes in departmental costs, and perform variance analysis. The end-product management system creates a patient-level data-base, identifies end products (patient-care groupings), develops standard resource protocols, models alternative assumptions, performs variance analysis, and provides concurrent reporting. Examples are given of pharmacy managers' use of such systems to answer questions in the areas of product costing, product pricing, variance analysis, productivity monitoring, flexible budgeting, modeling and planning, and comparative analysis.(ABSTRACT TRUNCATED AT 250 WORDS)
Comparison of the efficiency between two sampling plans for aflatoxins analysis in maize
Mallmann, Adriano Olnei; Marchioro, Alexandro; Oliveira, Maurício Schneider; Rauber, Ricardo Hummes; Dilkin, Paulo; Mallmann, Carlos Augusto
2014-01-01
Variance and performance of two sampling plans for aflatoxins quantification in maize were evaluated. Eight lots of maize were sampled using two plans: manual, using sampling spear for kernels; and automatic, using a continuous flow to collect milled maize. Total variance and sampling, preparation, and analysis variance were determined and compared between plans through multifactor analysis of variance. Four theoretical distribution models were used to compare aflatoxins quantification distributions in eight maize lots. The acceptance and rejection probabilities for a lot under certain aflatoxin concentration were determined using variance and the information on the selected distribution model to build the operational characteristic curves (OC). Sampling and total variance were lower at the automatic plan. The OC curve from the automatic plan reduced both consumer and producer risks in comparison to the manual plan. The automatic plan is more efficient than the manual one because it expresses more accurately the real aflatoxin contamination in maize. PMID:24948911
Airport Landside. Volume I. Planning Guide.
DOT National Transportation Integrated Search
1982-01-01
This volume describes a methodology for performing airport landside planning by applying the Airport Landside Simulation Model (ALSIM) developed by TSC. For this analysis, the airport landside is defined as extending from the airport boundary to the ...
de Belvis, A G; Biasco, A; Pelone, F; Romaniello, A; De Micco, F; Volpe, M; Ricciardi, W
2009-01-01
The objective of our research is to report on the diffusion of Clinical Governance, as introduced with the National Health Plan 2006-2008, by analysing the planning instruments set up by each Region (Regional Health Plans and Emergency Plans in regions with budget deficit), the organizational frameworks (Atti Aziendali, firm acts), and the surveys on performance and quality of healthcare among the Italian Local Health Units (Health Surveys). Our research was realized on September-December 2007 and consisted of the collection of all retrieved documents available on the web and on the online public access catalog (OPAC SBN) of the National Library Service. Futhermore, each document has been classified and analysed according to Chambers' Clinical Governance definition. A descriptive statistical and inferential analysis by applying the Chi-2 Test was performed to test the correlation between the diffusion of such a classified documents and the geographical partition of each LHU. Our results show a scarce diffusion of Firm acts (43%) and Health Surveys (24.9% of the total). Any remind to Clinical Governance instruments and methods inside each document resulted even poorer among both the organizational and performance surveys and the regional health planning frameworks, respectively.
The Advantages of Using Planned Comparisons over Post Hoc Tests.
ERIC Educational Resources Information Center
Kuehne, Carolyn C.
There are advantages to using a priori or planned comparisons rather than omnibus multivariate analysis of variance (MANOVA) tests followed by post hoc or a posteriori testing. A small heuristic data set is used to illustrate these advantages. An omnibus MANOVA test was performed on the data followed by a post hoc test (discriminant analysis). A…
ALS rocket engine combustion devices design and demonstration
NASA Technical Reports Server (NTRS)
Arreguin, Steve
1989-01-01
Work performed during Phase one is summarized and the significant technical and programmatic accomplishments occurring during this period are documented. Besides a summary of the results, methodologies, trade studies, design, fabrication, and hardware conditions; the following are included: the evolving Maintainability Plan, Reliability Program Plan, Failure Summary and Analysis Report, and the Failure Mode and Effect Analysis.
TRU Waste Management Program. Cost/schedule optimization analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
Damman, Olga C; Stubbe, Janine H; Hendriks, Michelle; Arah, Onyebuchi A; Spreeuwenberg, Peter; Delnoij, Diana M J; Groenewegen, Peter P
2009-04-01
Ratings on the quality of healthcare from the consumer's perspective need to be adjusted for consumer characteristics to ensure fair and accurate comparisons between healthcare providers or health plans. Although multilevel analysis is already considered an appropriate method for analyzing healthcare performance data, it has rarely been used to assess case-mix adjustment of such data. The purpose of this article is to investigate whether multilevel regression analysis is a useful tool to detect case-mix adjusters in consumer assessment of healthcare. We used data on 11,539 consumers from 27 Dutch health plans, which were collected using the Dutch Consumer Quality Index health plan instrument. We conducted multilevel regression analyses of consumers' responses nested within health plans to assess the effects of consumer characteristics on consumer experience. We compared our findings to the results of another methodology: the impact factor approach, which combines the predictive effect of each case-mix variable with its heterogeneity across health plans. Both multilevel regression and impact factor analyses showed that age and education were the most important case-mix adjusters for consumer experience and ratings of health plans. With the exception of age, case-mix adjustment had little impact on the ranking of health plans. On both theoretical and practical grounds, multilevel modeling is useful for adequate case-mix adjustment and analysis of performance ratings.
Business Plan for the Southwest Regional Spaceport: Executive Summary
NASA Technical Reports Server (NTRS)
1997-01-01
A proposal for a commercial, full-service launch, tracking, and recovery complex for Reusable Launch Vehicles in New Mexico is presented. Vision, mission, business definition, competitive advantages, and business approach are formulated. Management plan and team structure are detailed, and anticipated market is described. Finance and marketing plans are presented. Financial analysis is performed.
ERIC Educational Resources Information Center
Innovative Systems Research, Inc., Pennsauken, NJ.
Twelve different conversion plans were delineated and evaluated in the performance of this study effort. An indepth technical, financial, and cost/benefit analysis was included. One plan was determined to be distinctively more cost-effective than any of the other plans because it provided a technically feasible system that assured the maximum…
Evaluation of scheduling techniques for payload activity planning
NASA Technical Reports Server (NTRS)
Bullington, Stanley F.
1991-01-01
Two tasks related to payload activity planning and scheduling were performed. The first task involved making a comparison of space mission activity scheduling problems with production scheduling problems. The second task consisted of a statistical analysis of the output of runs of the Experiment Scheduling Program (ESP). Details of the work which was performed on these two tasks are presented.
Best Practices for Optimizing DoD Contractor Safety and Occupational Health Program Performance
2012-12-01
such as Accident Prevention Plan (APP), Activity Hazard Analysis (AHA), Quality Assurance Surveillance Plans (QASP), etc. Contract administration...technology support, medical , and maintenance of equipment and facilities. The DoD Guidebook for the Acquisition of Services, provides acquisition...OSHA regulations and perform in accordance with an applicable accident prevention program that complies with State and Federal requirements. The
DOT National Transportation Integrated Search
2011-12-01
Researchers performed a system level technical study of physical layer and network layer performance of vehicular communication in a specially licensed Dedicated Short Range Communication (DSRC) 5.9 GHz frequency band. Physical layer analysis provide...
Using Ratio Analysis to Evaluate Financial Performance.
ERIC Educational Resources Information Center
Minter, John; And Others
1982-01-01
The ways in which ratio analysis can help in long-range planning, budgeting, and asset management to strengthen financial performance and help avoid financial difficulties are explained. Types of ratios considered include balance sheet ratios, net operating ratios, and contribution and demand ratios. (MSE)
Winkler, Peter; Zurl, Brigitte; Guss, Helmuth; Kindl, Peter; Stuecklschweiger, Georg
2005-02-21
A system for dosimetric verification of intensity-modulated radiotherapy (IMRT) treatment plans using absolute calibrated radiographic films is presented. At our institution this verification procedure is performed for all IMRT treatment plans prior to patient irradiation. Therefore clinical treatment plans are transferred to a phantom and recalculated. Composite treatment plans are irradiated to a single film. Film density to absolute dose conversion is performed automatically based on a single calibration film. A software application encompassing film calibration, 2D registration of measurement and calculated distributions, image fusion, and a number of visual and quantitative evaluation utilities was developed. The main topic of this paper is a performance analysis for this quality assurance procedure, with regard to the specification of tolerance levels for quantitative evaluations. Spatial and dosimetric precision and accuracy were determined for the entire procedure, comprising all possible sources of error. The overall dosimetric and spatial measurement uncertainties obtained thereby were 1.9% and 0.8 mm respectively. Based on these results, we specified 5% dose difference and 3 mm distance-to-agreement as our tolerance levels for patient-specific quality assurance for IMRT treatments.
Modeling left turn queue lengths.
DOT National Transportation Integrated Search
2011-01-01
This guidebook provides methodologies and procedures for using incident data collected at Texas transportation management centers (TMCs) to perform two types of analysis - evaluation/planning analysis and predictive analysis. For the evaluation/plann...
Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)
NASA Technical Reports Server (NTRS)
Niewoehner, Kevin R.; Carter, John (Technical Monitor)
2001-01-01
The research accomplishments for the cooperative agreement 'Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)' include the following: (1) previous IFC program data collection and analysis; (2) IFC program support site (configured IFC systems support network, configured Tornado/VxWorks OS development system, made Configuration and Documentation Management Systems Internet accessible); (3) Airborne Research Test Systems (ARTS) II Hardware (developed hardware requirements specification, developing environmental testing requirements, hardware design, and hardware design development); (4) ARTS II software development laboratory unit (procurement of lab style hardware, configured lab style hardware, and designed interface module equivalent to ARTS II faceplate); (5) program support documentation (developed software development plan, configuration management plan, and software verification and validation plan); (6) LWR algorithm analysis (performed timing and profiling on algorithm); (7) pre-trained neural network analysis; (8) Dynamic Cell Structures (DCS) Neural Network Analysis (performing timing and profiling on algorithm); and (9) conducted technical interchange and quarterly meetings to define IFC research goals.
Factors affecting construction performance: exploratory factor analysis
NASA Astrophysics Data System (ADS)
Soewin, E.; Chinda, T.
2018-04-01
The present work attempts to develop a multidimensional performance evaluation framework for a construction company by considering all relevant measures of performance. Based on the previous studies, this study hypothesizes nine key factors, with a total of 57 associated items. The hypothesized factors, with their associated items, are then used to develop questionnaire survey to gather data. The exploratory factor analysis (EFA) was applied to the collected data which gave rise 10 factors with 57 items affecting construction performance. The findings further reveal that the items constituting ten key performance factors (KPIs) namely; 1) Time, 2) Cost, 3) Quality, 4) Safety & Health, 5) Internal Stakeholder, 6) External Stakeholder, 7) Client Satisfaction, 8) Financial Performance, 9) Environment, and 10) Information, Technology & Innovation. The analysis helps to develop multi-dimensional performance evaluation framework for an effective measurement of the construction performance. The 10 key performance factors can be broadly categorized into economic aspect, social aspect, environmental aspect, and technology aspects. It is important to understand a multi-dimension performance evaluation framework by including all key factors affecting the construction performance of a company, so that the management level can effectively plan to implement an effective performance development plan to match with the mission and vision of the company.
FY 1986 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
The impact of health reform on the Medicare Advantage program: realigning payment with performance.
Biles, Brian; Casillas, Giselle; Arnold, Grace; Guterman, Stuart
2012-10-01
The Affordable Care Act enacts a new payment system for private health plans available to Medicare beneficiaries through the Medicare Advantage (MA) program. The system, which is being phased in through 2017, aims to (1) reduce the excess payments received by private plans relative to per capita spending in traditional Medicare, and (2) reward plans that earn high performance ratings. Using 2009 data, this issue brief presents analysis of the distributional impact on MA plan payments of these new policies as if they had been fully implemented in that year. We find that, when the polices [sic] are in place, they will bring overall MA plan payments nationwide down from 114 percent to 102 percent of what spending would have been for the same enrollees if they had been enrolled in traditional Medicare. While payments will vary across the nation, high-performing MA plans stand to benefit from this new arrangement.
Sensor planning for moving targets
NASA Astrophysics Data System (ADS)
Musman, Scott A.; Lehner, Paul; Elsaesser, Chris
1994-10-01
Planning a search for moving ground targets is difficult for humans and computationally intractable. This paper describes a technique to solve such problems. The main idea is to combine probability of detection assessments with computational search heuristics to generate sensor plans which approximately maximize either the probability of detection or a user- specified knowledge function (e.g., determining the target's probable destination; locating the enemy tanks). In contrast to super computer-based moving target search planning, our technique has been implemented using workstation technology. The data structures generated by sensor planning can be used to evaluate sensor reports during plan execution. Our system revises its objective function with each sensor report, allowing the user to assess both the current situation as well as the expected value of future information. This capability is particularly useful in situations involving a high rate of sensor reporting, helping the user focus his attention on sensors reports most pertinent to current needs. Our planning approach is implemented in a three layer architecture. The layers are: mobility analysis, followed by sensor coverage analysis, and concluding with sensor plan analysis. It is possible using these layers to describe the physical, spatial, and temporal characteristics of a scenario in the first two layers, and customize the final analysis to specific intelligence objectives. The architecture also allows a user to customize operational parameters in each of the three major components of the system. As examples of these performance options, we briefly describe the mobility analysis and discuss issues affecting sensor plan analysis.
Using TPO data to estimate timber demand in support of planning on the Tongass National Forest
Jean M. Daniels; Michael D. Paruszkiewicz; Susan J. Alexander
2015-01-01
Projections of Alaska timber products output, the derived demand for logs, lumber, residues, and niche products, and timber harvest by owner are developed by using a trend-based analysis. This is the fifth such analysis performed since 1990 to assist planners in meeting statutory requirements for estimating planning cycle demand for timber from the Tongass National...
Numbers of Beauty: An Innovative Aesthetic Analysis for Orthognathic Surgery Treatment Planning.
Marianetti, Tito Matteo; Gasparini, Giulio; Midulla, Giulia; Grippaudo, Cristina; Deli, Roberto; Cervelli, Daniele; Pelo, Sandro; Moro, Alessandro
2016-01-01
The aim of this study was to validate a new aesthetic analysis and establish the sagittal position of the maxilla on an ideal group of reference. We want to demonstrate the usefulness of these findings in the treatment planning of patients undergoing orthognathic surgery. We took a reference group of 81 Italian women participating in a national beauty contest in 2011 on which we performed Arnett's soft tissues cephalometric analysis and our new "Vertical Planning Line" analysis. We used the ideal values to elaborate the surgical treatment planning of a second group of 60 consecutive female patients affected by skeletal class III malocclusion. Finally we compared both pre- and postoperative pictures with the reference values of the ideal group. The ideal group of reference does not perfectly fit in Arnett's proposed norms. From the descriptive statistical comparison of the patients' values before and after orthognathic surgery with the reference values we observed how all parameters considered got closer to the ideal population. We consider our "Vertical Planning Line" a useful help for orthodontist and surgeon in the treatment planning of patients with skeletal malocclusions, in combination with the clinical facial examination and the classical cephalometric analysis of bone structures.
Data-driven freeway performance evaluation framework for project prioritization and decision making.
DOT National Transportation Integrated Search
2017-01-01
This report describes methods that potentially can be incorporated into the performance monitoring and planning processes for freeway performance evaluation and decision making. Reliability analysis was conducted on the selected I-15 corridor by empl...
Data-driven freeway performance evaluation framework for project prioritization and decision making.
DOT National Transportation Integrated Search
2015-03-01
This report describes methods that potentially can be incorporated into the performance monitoring and planning : processes for freeway performance evaluation and decision making. Reliability analysis is conducted on the selected : I-15 corridor by e...
Cost analysis of adjustments of the epidemiological surveillance system to mass gatherings.
Zieliński, Andrzej
2011-01-01
The article deals with the problem of economical analysis of public health activities at mass gatherings. After presentation of elementary review of basic economical approaches to cost analysis author tries to analyze applicability of those methods to planning of mass gatherings. Difficulties in comparability of different events and lack of the outcome data at the stage of planning make most of the economic approaches unsuitable to application at the planning stage. Even applicability of cost minimization analysis may be limited to comparison of predicted costs of preconceived standards of epidemiological surveillance. Cost effectiveness performed ex post after the event when both costs and obtained effects are known, may bring more information for future selection of most effective procedures.
Guiahi, Maryam; Westhoff, Carolyn L; Summers, Sondra; Kenton, Kimberly
2013-06-01
Prior data suggest that opportunities in family planning training may be limited during obstetrics and gynecology (Ob-Gyn) residency training, particularly at faith-based institutions with moral and ethical constraints, although this aspect of the Ob-Gyn curriculum has not been formally studied to date. We compared Ob-Gyn residents' self-rated competency and intentions to provide family planning procedures at faith-based versus those of residents at non-faith-based programs. We surveyed residents at all 20 Ob-Gyn programs in Illinois, Indiana, Iowa, and Wisconsin from 2008 to 2009. Residents were queried about current skills and future plans to perform family planning procedures. We examined associations based on program and residents' personal characteristics and performed multivariable logistic regression analysis. A total of 232 of 340 residents (68%) from 17 programs (85%) returned surveys. Seven programs were faith-based. Residents from non-faith-based programs were more likely to be completely satisfied with family planning training (odds ratio [OR] = 3.4, 95% confidence limit [CI], 1.9-6.2) and to report they "understand and can perform on own" most procedures. Most residents, regardless of program type, planned to provide all surveyed family planning services. Despite similar intentions to provide family planning procedures after graduation, residents at faith-based training programs were less satisfied with their family planning training and rate their ability to perform family planning services lower than residents at non-faith-based training programs.
How to Submit a Risk Management Plan (RMP) to EPA
RMP*eSubmit software is the only way to submit RMPs. After you have prepared your plan using RMP*eSubmit, you may also re-submit, correct, or withdraw an RMP. Another electronic tool, RMP*Comp, performs the required off-site consequence analysis.
Quiet, Efficient Fans for Spaceflight: An Overview of NASA's Technology Development Plan
NASA Technical Reports Server (NTRS)
Koch, L. Danielle
2010-01-01
A Technology Development Plan to improve the aerodynamic and acoustic performance of spaceflight fans has been submitted to NASA s Exploration Technology Development Program. The plan describes a research program intended to make broader use of the technology developed at NASA Glenn to increase the efficiency and reduce the noise of aircraft engine fans. The goal is to develop a set of well-characterized government-owned fans nominally suited for spacecraft ventilation and cooling systems. NASA s Exploration Life Support community will identify design point conditions for the fans in this study. Computational Fluid Dynamics codes will be used in the design and analysis process. The fans will be built and used in a series of tests. Data from aerodynamic and acoustic performance tests will be used to validate performance predictions. These performance maps will also be entered into a database to help spaceflight fan system developers make informed design choices. Velocity measurements downstream of fan rotor blades and stator vanes will also be collected and used for code validation. Details of the fan design, analysis, and testing will be publicly reported. With access to fan geometry and test data, the small fan industry can independently evaluate design and analysis methods and work towards improvement.
Application of automatic vehicle location in law enforcement: An introductory planning guide
NASA Technical Reports Server (NTRS)
Hansen, G. R.; Leflang, W. G.
1976-01-01
A set of planning guidelines for the application of automatic vehicle location (AVL) to law enforcement is presented. Some essential characteristics and applications of AVL are outlined; systems in the operational or planning phases are discussed. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. A detailed description of a typical law enforcement AVL system, and a list of vendor sources are given in appendixes.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harding, R., E-mail: ruth.harding2@wales.nhs.uk; Trnková, P.; Lomax, A. J.
Purpose: Base of skull meningioma can be treated with both intensity modulated radiation therapy (IMRT) and spot scanned proton therapy (PT). One of the main benefits of PT is better sparing of organs at risk, but due to the physical and dosimetric characteristics of protons, spot scanned PT can be more sensitive to the uncertainties encountered in the treatment process compared with photon treatment. Therefore, robustness analysis should be part of a comprehensive comparison between these two treatment methods in order to quantify and understand the sensitivity of the treatment techniques to uncertainties. The aim of this work was tomore » benchmark a spot scanning treatment planning system for planning of base of skull meningioma and to compare the created plans and analyze their robustness to setup errors against the IMRT technique. Methods: Plans were produced for three base of skull meningioma cases: IMRT planned with a commercial TPS [Monaco (Elekta AB, Sweden)]; single field uniform dose (SFUD) spot scanning PT produced with an in-house TPS (PSI-plan); and SFUD spot scanning PT plan created with a commercial TPS [XiO (Elekta AB, Sweden)]. A tool for evaluating robustness to random setup errors was created and, for each plan, both a dosimetric evaluation and a robustness analysis to setup errors were performed. Results: It was possible to create clinically acceptable treatment plans for spot scanning proton therapy of meningioma with a commercially available TPS. However, since each treatment planning system uses different methods, this comparison showed different dosimetric results as well as different sensitivities to setup uncertainties. The results confirmed the necessity of an analysis tool for assessing plan robustness to provide a fair comparison of photon and proton plans. Conclusions: Robustness analysis is a critical part of plan evaluation when comparing IMRT plans with spot scanned proton therapy plans.« less
Fisher, David M
2014-05-01
Planning in teams represents a critical process that lays the groundwork for effective team functioning. The current investigation examined whether emergent team planning can be meaningfully characterized in terms of a distinction between planning that focuses on taskwork and planning that focuses on teamwork. In Study 1, items written to reflect commonly identified indicators of team planning were subjected to an exploratory factor analysis. In Study 2, slightly modified items were provided to a separate sample, and a confirmatory factor analysis was conducted. In Study 3, the relationships between the different forms of planning and other team processes (i.e., coordination, interpersonal processes) were examined in order to determine whether there are unique relationships for task-focused and team-focused planning. Results from the first 2 studies provided support for a 2-factor structure of team planning, whereas Study 3 found independent relationships for taskwork and teamwork planning with subsequent team processes. Both forms of planning also exhibited indirect relationships with team performance via the mediating role of subsequent team processes. (c) 2014 APA, all rights reserved.
Evidence of early development of action planning in the human foetus: a kinematic study.
Zoia, Stefania; Blason, Laura; D'Ottavio, Giuseppina; Bulgheroni, Maria; Pezzetta, Eva; Scabar, Aldo; Castiello, Umberto
2007-01-01
The aim of the present study was to investigate whether foetal hand movements are planned and how they are executed. We performed a kinematic analysis of hand movements directed towards the mouth and the eyes in the foetuses of eight women with normally evolving pregnancies. At 14, 18 and 22 weeks of gestation, eight foetuses underwent a 20-min four-dimensional-ultrasound session. The video recordings for these movements were then imported into in-house software developed to perform kinematic analysis. We found that spatial and temporal characteristics of foetal movements are by no means uncoordinated or unpatterned. By 22 weeks of gestation the movements seem to show the recognizable form of intentional actions, with kinematic patterns that depend on the goal of the action, suggesting a surprisingly advanced level of motor planning.
Demand and capacity planning in the emergency department: how to do it.
Higginson, I; Whyatt, J; Silvester, K
2011-02-01
Unless emergency departments have adequate capacity to meet demand, they will fail to meet clinical and performance standards and will be operating in the 'coping zone'. This carries risks both for staff and patients. As part of a quality improvement programme, the authors undertook an in-depth analysis of demand and capacity for an emergency department in the UK. The paper describes this rigorous approach to capacity planning, which draws on techniques from other industries. Proper capacity planning is vital, but is often poorly done. Planning using aggregated data will lead to inadequate capacity. Understanding demand, and particularly the variation in that demand, is critical to success. Analysis of emergency department demand and capacity is the first step towards effective workforce planning and process redesign.
NASA Astrophysics Data System (ADS)
Kwakkel, Jan; Haasnoot, Marjolijn
2015-04-01
In response to climate and socio-economic change, in various policy domains there is increasingly a call for robust plans or policies. That is, plans or policies that performs well in a very large range of plausible futures. In the literature, a wide range of alternative robustness metrics can be found. The relative merit of these alternative conceptualizations of robustness has, however, received less attention. Evidently, different robustness metrics can result in different plans or policies being adopted. This paper investigates the consequences of several robustness metrics on decision making, illustrated here by the design of a flood risk management plan. A fictitious case, inspired by a river reach in the Netherlands is used. The performance of this system in terms of casualties, damages, and costs for flood and damage mitigation actions is explored using a time horizon of 100 years, and accounting for uncertainties pertaining to climate change and land use change. A set of candidate policy options is specified up front. This set of options includes dike raising, dike strengthening, creating more space for the river, and flood proof building and evacuation options. The overarching aim is to design an effective flood risk mitigation strategy that is designed from the outset to be adapted over time in response to how the future actually unfolds. To this end, the plan will be based on the dynamic adaptive policy pathway approach (Haasnoot, Kwakkel et al. 2013) being used in the Dutch Delta Program. The policy problem is formulated as a multi-objective robust optimization problem (Kwakkel, Haasnoot et al. 2014). We solve the multi-objective robust optimization problem using several alternative robustness metrics, including both satisficing robustness metrics and regret based robustness metrics. Satisficing robustness metrics focus on the performance of candidate plans across a large ensemble of plausible futures. Regret based robustness metrics compare the performance of a candidate plan with the performance of other candidate plans across a large ensemble of plausible futures. Initial results suggest that the simplest satisficing metric, inspired by the signal to noise ratio, results in very risk averse solutions. Other satisficing metrics, which handle the average performance and the dispersion around the average separately, provide substantial additional insights into the trade off between the average performance, and the dispersion around this average. In contrast, the regret-based metrics enhance insight into the relative merits of candidate plans, while being less clear on the average performance or the dispersion around this performance. These results suggest that it is beneficial to use multiple robustness metrics when doing a robust decision analysis study. Haasnoot, M., J. H. Kwakkel, W. E. Walker and J. Ter Maat (2013). "Dynamic Adaptive Policy Pathways: A New Method for Crafting Robust Decisions for a Deeply Uncertain World." Global Environmental Change 23(2): 485-498. Kwakkel, J. H., M. Haasnoot and W. E. Walker (2014). "Developing Dynamic Adaptive Policy Pathways: A computer-assisted approach for developing adaptive strategies for a deeply uncertain world." Climatic Change.
The impact of health plan delivery system organization on clinical quality and patient satisfaction.
Gillies, Robin R; Chenok, Kate Eresian; Shortell, Stephen M; Pawlson, Gregory; Wimbush, Julian J
2006-08-01
The purpose of this study was to examine the extent to which measures of health plan clinical performance and measures of patient perceptions of care are associated with health plan organizational characteristics, including the percentage of care provided based on a group or staff model delivery system, for-profit (tax) status, and affiliation with a national managed care firm. Data describing health plans on region, age of health plan, for-profit status, affiliation with a national managed care firm, percentage of Medicare business, total enrollment, ratio of primary care physicians to specialists, HMO penetration, and form of health care delivery system (e.g., IPA, network, mixed, staff, group) were obtained from InterStudy. Clinical performance measures for women's health screening rates, child and adolescent immunization rates, heart disease screening rates, diabetes screening rates, and smoking cessation were developed from HEDIS data. Measures of patient perceptions of care are obtained from CAHPS survey data submitted as Healthplan Employer Data and Information Set, Consumer Assessment of Health Plans 2.0 H. Multivariate regression cross-sectional analysis of 272 health plans was used to evaluate the relationship of health plan characteristics with measures of clinical performance and patient perceptions of care. The form of delivery system, measured by percent of care delivered by staff and group model systems, is significantly related (p < or = .05) with four of the five clinical performance indices but none of the three satisfaction performance indices. Other variables significantly associated with performance were being geographically located in the Northeast, having nonprofit status, and for patient satisfaction, not being part of a larger insurance company. These comparative results provide evidence suggesting that the type of delivery system used by health plans is related to many clinical performance measures but is not related to patient perceptions of care. These findings underscore the importance of the form of the delivery system and the need for further inquiry that examines the relationship between organizational form and performance.
Data Sparsity Considerations in Climate Impact Analysis for the Water Sector (Invited)
NASA Astrophysics Data System (ADS)
Asante, K. O.; Khimsara, P.; Chan, A.
2013-12-01
Scientists and planners are helping governments and communities around the world to prepare for climate change by performing local impact studies and developing adaptation plans. Most studies begin by analyzing global climate models outputs to estimate the magnitude of projected change, assessing vulnerabilities and proposing adaptation measures. In these studies, climate projections from the Intergovernmental Panel on Climate Change (IPCC) Data Distribution Centre (DDC) are either used directly or downscaled using regional models. Since climate projections cover the entire global, climate change analysis can be performed for any location. However, selection of climate projections for use in historically data sparse regions presents special challenges. Key questions arise about the impact of historical data sparsity on quality of climate projections, spatial consistency of results and suitability for applications such as water resource planning. In this paper, a water-sector climate study conducted in a data-rich setting in California is compared to a similar study conducted a data-sparse setting in Mozambique. The challenges of selecting projections, performing analysis and interpreting the results for climate adaption planning are compared to illustrate the decision process and challenges encountered in these two very different settings.
The impact of health plan report cards on managed care enrollment.
Scanlo, Dennis P; Chernew, Michael; Mclaughlin, Catherine; Solon, Gary
2002-01-01
How does the release of health plan performance ratings influence employee health plan choice? A natural experiment at General Motors (GM) Corporation provides valuable evidence on this question. During the 1997 open enrollment period, GM disseminated a health plan report card for the first time. By comparing 1996 and 1997 enrollment patterns, our analysis estimates the impact of the report card information while accounting for fixed, unobserved plan traits. Results indicate that employees are less likely to enroll in plans requiring relatively high out-of-pocket contributions. Results with respect to report card ratings suggest that individuals avoid health plans with many below average ratings.
Software Engineering Improvement Activities/Plan
NASA Technical Reports Server (NTRS)
2003-01-01
bd Systems personnel accomplished the technical responsibilities for this reporting period, as planned. A close working relationship was maintained with personnel of the MSFC Avionics Department Software Group (ED14). Work accomplishments included development, evaluation, and enhancement of a software cost model, performing literature search and evaluation of software tools available for code analysis and requirements analysis, and participating in other relevant software engineering activities. Monthly reports were submitted. This support was provided to the Flight Software Group/ED 1 4 in accomplishing the software engineering improvement engineering activities of the Marshall Space Flight Center (MSFC) Software Engineering Improvement Plan.
Multimodal corridor and capacity analysis manual. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-12-31
This report presents the results of research carried out under NCHRP Project 8-31, Long-Term Availability of Multimodal Corridor Capacity. The report is presented as a manual on multimodal corridor and capacity analysis. Because transportation-system and corridor capacity for freight and passengers is critical for meeting current and future transportation demand, this manual will provide much needed assistance to a wide range of practitioners, particularly those engaged in performance analysis, capacity management, needs studies, systems planning, and corridor development planning--including major investment studies. It provides information regarding capacity analysis approaches for highways, rail, pipelines, and waterways and presents available options formore » enhancing corridor capacity and performance through various strategies such as new capacity development, freeing up unused capacity, or control of travel demand. Evaluation methods for these options are included.« less
Intelligent control of a planning system for astronaut training.
Ortiz, J; Chen, G
1999-07-01
This work intends to design, analyze and solve, from the systems control perspective, a complex, dynamic, and multiconstrained planning system for generating training plans for crew members of the NASA-led International Space Station. Various intelligent planning systems have been developed within the framework of artificial intelligence. These planning systems generally lack a rigorous mathematical formalism to allow a reliable and flexible methodology for their design, modeling, and performance analysis in a dynamical, time-critical, and multiconstrained environment. Formulating the planning problem in the domain of discrete-event systems under a unified framework such that it can be modeled, designed, and analyzed as a control system will provide a self-contained theory for such planning systems. This will also provide a means to certify various planning systems for operations in the dynamical and complex environments in space. The work presented here completes the design, development, and analysis of an intricate, large-scale, and representative mathematical formulation for intelligent control of a real planning system for Space Station crew training. This planning system has been tested and used at NASA-Johnson Space Center.
[Evaluation of women's health care programs in the main institutions of the Mexican health system].
Enciso, Graciela Freyermuth; Navarro, Sergio Meneses; Martínez, Martín Romero
2015-01-01
The aim of this study was to analyze the institutional capacity for provision of women's health care services in Mexico in accordance with prevailing regulations. A probabilistic national sample of health care institutions was used to compare performance rates according to services packages based on analysis of variance. No package showed outstanding performance. Adequate performance was seen in referral and counter-referral centers for uterine cervical cancer, childbirth care, breast cancer diagnosis, family planning counseling, and training in sexual and reproductive health. The lowest performance was seen in the prevention of uterine cervical cancer, obstetric urgencies, family and sexual violence, and promotion of family planning. All the institutions showed low performance in the prevention of breast cancer, promotion of family planning, and management of family and gender violence. The Ministry of Health's leadership needs to be strengthened in order to overcome resistance for the institutions to adhere to the prevailing regulations.
Semantic Mapping and Motion Planning with Turtlebot Roomba
NASA Astrophysics Data System (ADS)
Aslam Butt, Rizwan; Usman Ali, Syed M.
2013-12-01
In this paper, we have successfully demonstrated the semantic mapping and motion planning experiments on Turtlebot Robot using Microsoft Kinect in ROS environment. Moreover, we have also performed the comparative studies on various sampling based motion planning algorithms with Turtlebot in Open Motion Planning Library. Our comparative analysis revealed that Expansive Space Trees (EST) surmounted all other approaches with respect to memory occupation and processing time. We have also tried to summarize the related concepts of autonomous robotics which we hope would be helpful for beginners.
Application of computer-aided dispatch in law enforcement: An introductory planning guide
NASA Technical Reports Server (NTRS)
Sohn, R. L.; Gurfield, R. M.; Garcia, E. A.; Fielding, J. E.
1975-01-01
A set of planning guidelines for the application of computer-aided dispatching (CAD) to law enforcement is presented. Some essential characteristics and applications of CAD are outlined; the results of a survey of systems in the operational or planning phases are summarized. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. Detailed descriptions of typical law enforcement CAD systems, and a list of vendor sources, are given in appendixes.
Using a nursing balanced scorecard approach to measure and optimize nursing performance.
Jeffs, Lianne; Merkley, Jane; Richardson, Sandy; Eli, Jackie; McAllister, Mary
2011-04-01
The authors give an overview of one healthcare organization's experience in developing a nursing strategic plan and nursing balanced scorecard (NBS) using a focused planning process involving strategy mapping. The NBS is being used at this organization to manage the nursing strategic plan by leveraging and improving nursing processes and organizational capabilities as required, based on data and transparent communication of performance results to key stakeholders. Key strategies and insights may help other nurse leaders in developing or refining strategic approaches to measuring nursing performance. Vital to the success of an organization's strategic plan are ongoing endorsement, engagement and visibility of senior leaders. Quality of decisions made depends on the organization's ability to collect data from multiple sources using standardized definitions, mine data and extract them for statistical analysis and effectively present them in a compelling and understandable way to users and decision-makers.
Data Integration Framework Data Management Plan Remote Sensing Dataset
2016-07-01
performed by the Coastal Observations and Analysis Branch (CEERD-HFA) of the Flood and Storm Protection Division (CEERD-HF), U.S. Army Engineer Research... Protection Division, Coastal Observations and Analysis Branch CESAM U.S. Army Corps of Engineers, Mobile District CESAM-OP-J U.S. Army Corps of Engineers...ER D C/ CH L SR -1 6- 2 Coastal Ocean Data Systems Program Data Integration Framework Data Management Plan Remote Sensing Dataset Co
A Comparison of Probabilistic and Deterministic Campaign Analysis for Human Space Exploration
NASA Technical Reports Server (NTRS)
Merrill, R. Gabe; Andraschko, Mark; Stromgren, Chel; Cirillo, Bill; Earle, Kevin; Goodliff, Kandyce
2008-01-01
Human space exploration is by its very nature an uncertain endeavor. Vehicle reliability, technology development risk, budgetary uncertainty, and launch uncertainty all contribute to stochasticity in an exploration scenario. However, traditional strategic analysis has been done in a deterministic manner, analyzing and optimizing the performance of a series of planned missions. History has shown that exploration scenarios rarely follow such a planned schedule. This paper describes a methodology to integrate deterministic and probabilistic analysis of scenarios in support of human space exploration. Probabilistic strategic analysis is used to simulate "possible" scenario outcomes, based upon the likelihood of occurrence of certain events and a set of pre-determined contingency rules. The results of the probabilistic analysis are compared to the nominal results from the deterministic analysis to evaluate the robustness of the scenario to adverse events and to test and optimize contingency planning.
Medication adherence and measures of health plan quality.
Seabury, Seth A; Lakdawalla, Darius N; Dougherty, J Samantha; Sullivan, Jeff; Goldman, Dana P
2015-06-01
Medication adherence is increasingly being considered as a measure for performance-based reimbursement contracts in healthcare systems. However, the association between health outcomes and adherence at the plan level is unknown. Retrospective analysis of medical and pharmacy claims from a large private sector claims database from 2000 to 2009. We compared plan-level measures of medication adherence and health outcomes for patients with diabetes and congestive heart failure (CHF). Plan performance was based on average rates of disease complications. Medication adherence was calculated as the percent of patients having 80% of days covered for medications treating diabetes or CHF. Both adherence and outcomes were adjusted for patient differences using multivariate regression. Plans were stratified into low, moderate, and high adherence, based on adherence in the bottom quartile, middle 2 quartiles, and top quartile, respectively. Average adherence varied significantly across plans. Plans with low adherence to diabetes medications had adjusted rates of uncontrolled diabetes admissions of 13.2 per 1000 patients, compared with 11.2 in moderate adherence plans and 8.3 in high adherence plans (P < .001). The adjusted rate of CHF-related hospitalization was 15.3% in low adherence plans, compared with 12.4% in moderate adherence plans and 12.2% in high adherence plans (P < .001). These patterns were consistent across different types of complications for both diabetes and CHF. Private health plans vary considerably in average adherence to medications treating chronic diseases. Plans with higher average adherence had lower rates of disease complications, suggesting that medication adherence measures are potentially useful tools for improving the performance of health plans.
NASA Technical Reports Server (NTRS)
2005-01-01
The purpose of this document is to identify the general flight/mission planning requirements for same-day file-and-fly access to the NAS for both civil and military High-Altitude Long Endurance (HALE) Unmanned Aircraft System (UAS). Currently the scope of this document is limited to Step 1, operations above flight level 43,000 feet (FL430). This document describes the current applicable mission planning requirements and procedures for both manned and unmanned aircraft and addresses HALE UAS flight planning considerations in the future National Airspace System (NAS). It also discusses the unique performance and operational capabilities of HALE UAS associated with the Access 5 Project, presents some of the projected performance characteristics and conceptual missions for future systems, and provides detailed analysis of the recommended mission planning elements for operating HALE UAS in the NAS.
Abstract:Managing urban water infrastructures faces the challenge of jointly dealing with assets of diverse types, useful life, cost, ages and condition. Service quality and sustainability require sound long-term planning, well aligned with tactical and operational planning and m...
The PISA Project: A Final Report.
ERIC Educational Resources Information Center
Buhler-Miko, Marina
With the support of a 3-year grant from the Fund for The Improvement of Postsecondary Education (FIPSE), the Higher Education Strategic Planning Institute has built a shared experience strategic planning database for college and university top-level management. The Performance Improvement through Strategy Analysis (PISA) program began in 1982 with…
Planned and reactive agility performance in semiprofessional and amateur basketball players.
Lockie, Robert G; Jeffriess, Matthew D; McGann, Tye S; Callaghan, Samuel J; Schultz, Adrian B
2014-09-01
Research indicates that planned and reactive agility are different athletic skills. These skills have not been adequately assessed in male basketball players. To define whether 10-m-sprint performance and planned and reactive agility measured by the Y-shaped agility test can discriminate between semiprofessional and amateur basketball players. Ten semiprofessional and 10 amateur basketball players completed 10-m sprints and planned- and reactive-agility tests. The Y-shaped agility test involved subjects sprinting 5 m through a trigger timing gate, followed by a 45° cut and 5-m sprint to the left or right through a target gate. In the planned condition, subjects knew the cut direction. For reactive trials, subjects visually scanned to find the illuminated gate. A 1-way analysis of variance (P < .05) determined between-groups differences. Data were pooled (N = 20) for a correlation analysis (P < .05). The reactive tests differentiated between the groups; semiprofessional players were 6% faster for the reactive left (P = .036) and right (P = .029) cuts. The strongest correlations were between the 10-m sprints and planned-agility tests (r = .590-.860). The reactive left cut did not correlate with the planned tests. The reactive right cut moderately correlated with the 10-m sprint and planned right cut (r = .487-.485). The results reemphasized that planned and reactive agility are separate physical qualities. Reactive agility discriminated between the semiprofessional and amateur basketball players; planned agility did not. To distinguish between male basketball players of different ability levels, agility tests should include a perceptual and decision-making component.
A Cost-Effectiveness Analysis Model for Evaluating and Planning Secondary Vocational Programs
ERIC Educational Resources Information Center
Kim, Jin Eun
1977-01-01
This paper conceptualizes a cost-effectiveness analysis and describes a cost-effectiveness analysis model for secondary vocational programs. It generates three kinds of cost-effectiveness measures: program effectiveness, cost efficiency, and cost-effectiveness and/or performance ratio. (Author)
Nano-JASMINE and small-JASMINE data analysis
NASA Astrophysics Data System (ADS)
Yamada, Yoshiyuki; Shirasaki, Yuji; Nishi, Ryoichi
2018-04-01
Space astrometry missions Nano-JASMINE and small-JASMINE are planned in Japan. Data analysis tasks are performed under Gaia-JASMINE collaboration in long time. We expected to achieve 3 mas accuracy in Nano-JASMINE, and 20 micro arcsec in small-JASMINE of astrometric performance. Gaia DR1 publication and instruction is done from NAOJ and Niigata University.
NASA Technical Reports Server (NTRS)
Purushotham, K. S.
1972-01-01
A series of analyses is presented for experiment T003, inflight aerosol analysis, to be used for evaluating the performance of the Skylab corollary experiments under preflight, inflight, and post-flight conditions. Experiment contingency plan workaround procedure and malfunction analyses are presented in order to assist in making the experiment operationally successful.
An Integrated Approach for Conducting a Behavioral Systems Analysis
ERIC Educational Resources Information Center
Diener, Lori H.; McGee, Heather M.; Miguel, Caio F.
2009-01-01
The aim of this paper is to illustrate how to conduct a Behavioral Systems Analysis (BSA) to aid in the design of targeted performance improvement interventions. BSA is a continuous process of analyzing the right variables to the right extent to aid in planning and managing performance at the organization, process, and job levels. BSA helps to…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hill, P; Labby, Z; Bayliss, R A
Purpose: To develop a plan comparison tool that will ensure robustness and deliverability through analysis of baseline and online-adaptive radiotherapy plans using similarity metrics. Methods: The ViewRay MRIdian treatment planning system allows export of a plan file that contains plan and delivery information. A software tool was developed to read and compare two plans, providing information and metrics to assess their similarity. In addition to performing direct comparisons (e.g. demographics, ROI volumes, number of segments, total beam-on time), the tool computes and presents histograms of derived metrics (e.g. step-and-shoot segment field sizes, segment average leaf gaps). Such metrics were investigatedmore » for their ability to predict that an online-adapted plan reasonably similar to a baseline plan where deliverability has already been established. Results: In the realm of online-adaptive planning, comparing ROI volumes offers a sanity check to verify observations found during contouring. Beyond ROI analysis, it has been found that simply editing contours and re-optimizing to adapt treatment can produce a delivery that is substantially different than the baseline plan (e.g. number of segments increased by 31%), with no changes in optimization parameters and only minor changes in anatomy. Currently the tool can quickly identify large omissions or deviations from baseline expectations. As our online-adaptive patient population increases, we will continue to develop and refine quantitative acceptance criteria for adapted plans and relate them historical delivery QA measurements. Conclusion: The plan comparison tool is in clinical use and reports a wide range of comparison metrics, illustrating key differences between two plans. This independent check is accomplished in seconds and can be performed in parallel to other tasks in the online-adaptive workflow. Current use prevents large planning or delivery errors from occurring, and ongoing refinements will lead to increased assurance of plan quality.« less
NASA Astrophysics Data System (ADS)
O'Connor, Alison; Kirtman, Benjamin; Harrison, Scott; Gorman, Joe
2016-05-01
The US Navy faces several limitations when planning operations in regard to forecasting environmental conditions. Currently, mission analysis and planning tools rely heavily on short-term (less than a week) forecasts or long-term statistical climate products. However, newly available data in the form of weather forecast ensembles provides dynamical and statistical extended-range predictions that can produce more accurate predictions if ensemble members can be combined correctly. Charles River Analytics is designing the Climatological Observations for Maritime Prediction and Analysis Support Service (COMPASS), which performs data fusion over extended-range multi-model ensembles, such as the North American Multi-Model Ensemble (NMME), to produce a unified forecast for several weeks to several seasons in the future. We evaluated thirty years of forecasts using machine learning to select predictions for an all-encompassing and superior forecast that can be used to inform the Navy's decision planning process.
Assessing the Sustainability Performance of Urban Plans based on Ecosystem Services
NASA Astrophysics Data System (ADS)
Menteşe, E. Y.; Tezer, A.
2017-12-01
Aiming at efficient and mindful use of natural resources while enabling social cohesion and economic development; sustainable development is one of the most emerging phenomenon in last decade. In this regard, role of urban development is critical by means of achieving sustainability since more than half of the world's population lives in cities. However, there is no solid and widely accepted approach for sustainability assessment in land use planning because there is not enough evidence on the relation between land use plans and environmental sustainability. With the basic aim of setting up relation between environmental sustainability and urban plans, this study utilizes ecosystem services phenomenon to define sustainability performance of a land use plan. Since ecosystem services can easily be related with land cover and land use they can be used as an efficient tool to act as indicators of sustainability. Meanwhile, while urban plans can provide ecosystem services and their level of service provision can be quantified, this is not solely enough for understanding its sustainability. Because it is also known that a land use plan mostly has negative impact on sustainability. Hence, this study embraces land use plans as a source of ecosystem services and environmental impacts. The difference between these entities are assumed to be the sustainability performance of a plan. The analysis relies on four parameters: ecosystem service capacity (environmental impact capacity), areal quantity of a land cover / use function, fragmantation level of the land use / cover and weight of ecosystem services / environmental impacts. Lastly, this approach is adopted for Istanbul's environmental master plan of 2009 and actual land cover of the same period. By calculating both data's environmental performance, the change of sustainability level sourced from environmental plan is analyzed.
The application of seismic risk-benefit analysis to land use planning in Taipei City.
Hung, Hung-Chih; Chen, Liang-Chun
2007-09-01
In the developing countries of Asia local authorities rarely use risk analysis instruments as a decision-making support mechanism during planning and development procedures. The main purpose of this paper is to provide a methodology to enable planners to undertake such analyses. We illustrate a case study of seismic risk-benefit analysis for the city of Taipei, Taiwan, using available land use maps and surveys as well as a new tool developed by the National Science Council in Taiwan--the HAZ-Taiwan earthquake loss estimation system. We use three hypothetical earthquakes to estimate casualties and total and annualised direct economic losses, and to show their spatial distribution. We also characterise the distribution of vulnerability over the study area using cluster analysis. A risk-benefit ratio is calculated to express the levels of seismic risk attached to alternative land use plans. This paper suggests ways to perform earthquake risk evaluations and the authors intend to assist city planners to evaluate the appropriateness of their planning decisions.
Managing the "Performance" in Performance Management.
ERIC Educational Resources Information Center
Repinski, Marilyn; Bartsch, Maryjo
1996-01-01
Describes a five-step approach to performance management which includes (1) redefining tasks; (2) identifying skills; (3) determining what development tools are necessary; (4) prioritizing skills development; and (5) developing an action plan. Presents a hiring model that includes job analysis, job description, selection, goal setting, evaluation,…
An Analysis of the Economic Assumptions Underlying Fiscal Plans FY1981 - FY1984.
1986-06-01
OF THE ECONOMIC ASSUMPTIONS UNDERLYING FISCAL PLANS FY1981 - FY1984 by Robert Welch Beck June 1986 Thesis Advisor: P. M. CARRICK Approved for public ...DOWGRDIN SHEDLEApproved for public releace; it - 2b ECLSSIICAIONI DWNGAD G SHEDLEbut ion is unlimited. 4! PERFORMING ORGANIZATION REPORT NUMBER(S) S...SECURITY CLASSIFICATION OF T4 PAC~E All other editions are obsolete Approved for public release; distribution is unlimited. An Analysis of the
Impact of Operating Rules on Planning Capacity Expansion of Urban Water Supply Systems
NASA Astrophysics Data System (ADS)
de Neufville, R.; Galelli, S.; Tian, X.
2017-12-01
This study addresses the impact of operating rules on capacity planning of urban water supply systems. The continuous growth of metropolitan areas represents a major challenge for water utilities, which often rely on industrial water supply (e.g., desalination, reclaimed water) to complement natural resources (e.g., reservoirs). These additional sources increase the reliability of supply, equipping operators with additional means to hedge against droughts. How do their rules for using industrial water supply impact the performance of water supply system? How might it affect long-term plans for capacity expansion? Possibly significantly, as demonstrated by the analysis of the operations and planning of a water supply system inspired by Singapore. Our analysis explores the system dynamics under multiple inflow and management scenarios to understand the extent to which alternative operating rules for the use of industrial water supply affect system performance. Results first show that these operating rules can have significant impact on the variability in system performance (e.g., reliability, energy use) comparable to that of hydro-climatological conditions. Further analyses of several capacity expansion exercises—based on our original hydrological and management scenarios—show that operating rules significantly affect the timing and magnitude of critical decisions, such as the construction of new desalination plants. These results have two implications: Capacity expansion analysis should consider the effect of a priori uncertainty about operating rules; and operators should consider how their flexibility in operating rules can affect their perceived need for capacity.
Analysis of Trinity Power Metrics for Automated Monitoring
DOE Office of Scientific and Technical Information (OSTI.GOV)
Michalenko, Ashley Christine
This is a presentation from Los Alamos National Laboraotyr (LANL) about the analysis of trinity power metrics for automated monitoring. The following topics are covered: current monitoring efforts, motivation for analysis, tools used, the methodology, work performed during the summer, and future work planned.
Decoupling the use and meaning of strategic plans in public healthcare
2013-01-01
Background The culture of New Public Management has promoted the diffusion of strategic management tools throughout Public Healthcare Organisations (PHOs). There is consensus that better strategic planning tools are required to achieve higher levels of organisational performance. This paper provides evidence and understanding of the emergent uses and scope of strategic planning in PHOs, in order to answer three research questions: (i) has the New Public Management approach changed the organisational culture of PHOs in terms of how they adopt, diffuse, and use strategic planning documents? (ii) how coherent are strategic planning documents in PHOs? and (iii) what are the main purposes of strategic documents in PHOs? Methods An analysis was carried out in three Italian Local Health Authorities. We analysed the number and types of formal strategic documents adopted between 2004 and 2012, evaluating their degree of coherence and coordination, their hierarchy, their degree of disclosure, and the consistency of their strategic goals. A content analysis was performed to investigate overlap in terms of content and focus, and a qualitative analysis was carried out to study and represent the relationships between documents. Results The analysis showed that a rich set of strategic documents were adopted by each PHO. However, these are often uncoordinated and overlap in terms of content. They adopt different language and formats for various stakeholders. The presence of diverse external drivers may explain the divergent focus, priorities and inconsistent goals in the strategic documents. This planning complexity makes it difficult to determine how the overall goals and mission of an organisation are defined and made visible. Conclusions The evidence suggests that PHOs use a considerable number of strategic documents. However, they employ no clear or explicit overarching strategy currently, and strategic planning appears to be externally oriented. All the documents communicate similar topics to different stakeholders, although they use different language to answer to the different expectations of each stakeholder. Therefore, strategic planning and plans seem to be driven by neo-institutional approaches, as they are means to build consensus and negotiate ground for strategic actions, rather than means to identify strategic choices and priorities. PMID:23289527
Decoupling the use and meaning of strategic plans in public healthcare.
Lega, Federico; Longo, Francesco; Rotolo, Andrea
2013-01-04
The culture of New Public Management has promoted the diffusion of strategic management tools throughout Public Healthcare Organisations (PHOs). There is consensus that better strategic planning tools are required to achieve higher levels of organisational performance. This paper provides evidence and understanding of the emergent uses and scope of strategic planning in PHOs, in order to answer three research questions: (i) has the New Public Management approach changed the organisational culture of PHOs in terms of how they adopt, diffuse, and use strategic planning documents? (ii) how coherent are strategic planning documents in PHOs? and (iii) what are the main purposes of strategic documents in PHOs? An analysis was carried out in three Italian Local Health Authorities. We analysed the number and types of formal strategic documents adopted between 2004 and 2012, evaluating their degree of coherence and coordination, their hierarchy, their degree of disclosure, and the consistency of their strategic goals. A content analysis was performed to investigate overlap in terms of content and focus, and a qualitative analysis was carried out to study and represent the relationships between documents. The analysis showed that a rich set of strategic documents were adopted by each PHO. However, these are often uncoordinated and overlap in terms of content. They adopt different language and formats for various stakeholders. The presence of diverse external drivers may explain the divergent focus, priorities and inconsistent goals in the strategic documents. This planning complexity makes it difficult to determine how the overall goals and mission of an organisation are defined and made visible. The evidence suggests that PHOs use a considerable number of strategic documents. However, they employ no clear or explicit overarching strategy currently, and strategic planning appears to be externally oriented. All the documents communicate similar topics to different stakeholders, although they use different language to answer to the different expectations of each stakeholder. Therefore, strategic planning and plans seem to be driven by neo-institutional approaches, as they are means to build consensus and negotiate ground for strategic actions, rather than means to identify strategic choices and priorities.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Frazier, William; Baur, Gary
2015-11-03
The 1998 Interim Long-Term Surveillance Plan for the Cheney Disposal Site Near Grand Junction, Colorado, requires annual monitoring to assess the performance of the disposal cell. Monitoring wells 0731, 0732 and 0733 were sampled as specified in the plan. Sampling and analyses were conducted in accordance with Sampling and Analysis Plan for the U.S. Department of Energy Office of Legacy Management Sites.
SeaSat-A Satellite Scatterometer (SASS) Validation and Experiment Plan
NASA Technical Reports Server (NTRS)
Schroeder, L. C. (Editor)
1978-01-01
This plan was generated by the SeaSat-A satellite scatterometer experiment team to define the pre-and post-launch activities necessary to conduct sensor validation and geophysical evaluation. Details included are an instrument and experiment description/performance requirements, success criteria, constraints, mission requirements, data processing requirement and data analysis responsibilities.
75 FR 41599 - Reasonable Contract or Arrangement Under Section 408(b)(2)-Fee Disclosure
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-16
... affect a service provider's performance of services. The proposal also was designed to assist plan... purposes of this analysis and used information from the quantitative characterization of the service... IRAs should be subject to the final rule, which is designed with fiduciaries of employee benefit plans...
An Analysis and Plan of Test Development for the Law Enforcement Basic Training Course.
ERIC Educational Resources Information Center
Vineberg, Robert; Taylor, John E.
A test development plan is described to evaluate police enrolled in the law enforcement basic training course developed by California's Commission on Peace Officer Standards and Training (POST). Some general test methodologies are discussed: performance tests, knowledge tests, and situational tests, including role playing simulations and…
ERIC Educational Resources Information Center
Markee, Numa; Kunitz, Silvia
2013-01-01
We use insights and methods from ethnomethodological conversation analysis and discursive psychology to develop an account of embodied word and grammar searches as socially distributed planning practices. These practices, which were produced by three intermediate learners of Italian as a Foreign Language (IFL), occurred massively in natural data…
ERIC Educational Resources Information Center
Potter, Penny F.; Graham-Moore, Brian E.
Most organizations planning to assess adverse impact or perform a stock analysis for affirmative action planning must correctly classify their jobs into appropriate occupational categories. Two methods of job classification were assessed in a combination archival and field study. Classification results from expert judgment of functional job…
Career Plans of Men and Women in Gender Dominant Professions.
ERIC Educational Resources Information Center
Shann, Mary H.
Sex differences in the career plans of 601 men and women completing graduate training in the male-dominated professions of business, law, and medicine and the female-dominated professions of education, nursing, and social work were studied. Content analysis was performed to determine the continuity, specificity, ambition, and accommodation of…
Efficient greedy algorithms for economic manpower shift planning
NASA Astrophysics Data System (ADS)
Nearchou, A. C.; Giannikos, I. C.; Lagodimos, A. G.
2015-01-01
Consideration is given to the economic manpower shift planning (EMSP) problem, an NP-hard capacity planning problem appearing in various industrial settings including the packing stage of production in process industries and maintenance operations. EMSP aims to determine the manpower needed in each available workday shift of a given planning horizon so as to complete a set of independent jobs at minimum cost. Three greedy heuristics are presented for the EMSP solution. These practically constitute adaptations of an existing algorithm for a simplified version of EMSP which had shown excellent performance in terms of solution quality and speed. Experimentation shows that the new algorithms perform very well in comparison to the results obtained by both the CPLEX optimizer and an existing metaheuristic. Statistical analysis is deployed to rank the algorithms in terms of their solution quality and to identify the effects that critical planning factors may have on their relative efficiency.
Radiological performance assessment for the E-Area Vaults Disposal Facility. Appendices A through M
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cook, J.R.
1994-04-15
These document contains appendices A-M for the performance assessment. They are A: details of models and assumptions, B: computer codes, C: data tabulation, D: geochemical interactions, E: hydrogeology of the Savannah River Site, F: software QA plans, G: completeness review guide, H: performance assessment peer review panel recommendations, I: suspect soil performance analysis, J: sensitivity/uncertainty analysis, K: vault degradation study, L: description of naval reactor waste disposal, M: porflow input file. (GHH)
An assessment of PERT as a technique for schedule planning and control
NASA Technical Reports Server (NTRS)
Sibbers, C. W.
1982-01-01
The PERT technique including the types of reports which can be computer generated using the NASA/LaRC PPARS System is described. An assessment is made of the effectiveness of PERT on various types of efforts as well as for specific purposes, namely, schedule planning, schedule analysis, schedule control, monitoring contractor schedule performance, and management reporting. This assessment is based primarily on the author's knowledge of the usage of PERT by NASA/LaRC personnel since the early 1960's. Both strengths and weaknesses of the technique for various applications are discussed. It is intended to serve as a reference guide for personnel performing project planning and control functions and technical personnel whose responsibilities either include schedule planning and control or require a general knowledge of the subject.
1993-06-01
radius aid 20 minutes of comibat follovcu by retum to the carrer . A conical-flow waweider served as the starting pount for the aircraft configuration. A...design, test meia adj p teat paramieter siekction were studied for planned low speed wind and water tunnel tests as well as performance predictions fir die... planned win~d tunnel tests. 14. SUBJECT TERMS 15. NUMBER OF PAGES Waveniders, Hypersonics, Aircraft Design 82 `16. PRICE CODE 17. SECURITY
Solar Dynamics Observatory On-Orbit Jitter Testing, Analysis, and Mitigation Plans
NASA Technical Reports Server (NTRS)
Liu, Kuo-Chia (Alice); Blaurock, Carl A.; Bourkland, Kristin L.; Morgenstern, Wendy M.; Maghami, Peiman G.
2011-01-01
The Solar Dynamics Observatory (SDO) was designed to understand the Sun and the Sun s influence on Earth. SDO was launched on February 11, 2010 carrying three scientific instruments: the Atmospheric Imaging Assembly (AIA), the Helioseismic and Magnetic Imager (HMI), and the Extreme Ultraviolet Variability Experiment (EVE). Both AIA and HMI are sensitive to high frequency pointing perturbations and have sub-arcsecond level line-of-sight (LOS) jitter requirements. Extensive modeling and analysis efforts were directed in estimating the amount of jitter disturbing the science instruments. To verify the disturbance models and to validate the jitter performance prior to launch, many jitter-critical components and subassemblies were tested either by the mechanism vendors or at the NASA Goddard Space Flight Center (GSFC). Although detailed analysis and assembly level tests were performed to obtain good jitter predictions, there were still several sources of uncertainties in the system. The structural finite element model did not have all the modes correlated to test data at high frequencies (greater than 50 Hz). The performance of the instrument stabilization system was not known exactly but was expected to be close to the analytical model. A true disturbance-to-LOS observatory level test was not available due to the tight schedule of the flight spacecraft, the cost in time and manpower, difficulties in creating gravity negation systems, and risks of damaging flight hardware. To protect the observatory jitter performance against model uncertainties, the SDO jitter team devised several on-orbit jitter reduction plans in addition to reserve margins on analysis results. Since some of these plans severely restricted the capabilities of several spacecraft components (e.g. wheels and High Gain Antennas), the SDO team performed on-orbit jitter tests to determine which jitter reduction plans, if any, were necessary to satisfy science LOS jitter requirements. The SDO on-orbit jitter tests were designed to satisfy the following four objectives: 1. Determine the acceptable reaction wheel operational speed range during Science Mode. 2. Determine HGA algorithm jitter parameters (number of stagger steps and enable/disable no-steprequests). 3. Determine acceptable EVE instrument filter wheels spin rates. 4. Determine if AIA instrument filter wheels excite the first AIA telescope structural mode. This paper provides detailed information on the SDO wheel jitter test plan, shows on-orbit jitter measurements and how ground predictions compare to those measurements, and describes the final jitter mitigation plan executed on SDO.
Analysis of the performance of the drive system and diffuser of the Langley unitary plan wind tunnel
NASA Technical Reports Server (NTRS)
Hasel, L. E.; Stallings, R. L.
1981-01-01
A broad program was initiated at the Langley Research Center in 1973 to reduce the energy consumption of the laboratory. As a part of this program, the performance characteristics of the Unitary Plan Wind Tunnel were reexamined to determine if potential methods for incresing the operating efficiencies of the tunnel could be formulated. The results of that study are summarized. The performance characteristics of the drive system components and the variable-geometry diffuser system of the tunnel are documented and analyzed. Several potential methods for reducing the energy requirements of the facility are discussed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ellefson, S; Department of Human Oncology, University of Wisconsin, Madison, WI; Culberson, W
Purpose: Discrepancies in absolute dose values have been detected between the ViewRay treatment planning system and ArcCHECK readings when performing delivery quality assurance on the ViewRay system with the ArcCHECK-MR diode array (SunNuclear Corporation). In this work, we investigate whether these discrepancies are due to errors in the ViewRay planning and/or delivery system or due to errors in the ArcCHECK’s readings. Methods: Gamma analysis was performed on 19 ViewRay patient plans using the ArcCHECK. Frequency analysis on the dose differences was performed. To investigate whether discrepancies were due to measurement or delivery error, 10 diodes in low-gradient dose regions weremore » chosen to compare with ion chamber measurements in a PMMA phantom with the same size and shape as the ArcCHECK, provided by SunNuclear. The diodes chosen all had significant discrepancies in absolute dose values compared to the ViewRay TPS. Absolute doses to PMMA were compared between the ViewRay TPS calculations, ArcCHECK measurements, and measurements in the PMMA phantom. Results: Three of the 19 patient plans had 3%/3mm gamma passing rates less than 95%, and ten of the 19 plans had 2%/2mm passing rates less than 95%. Frequency analysis implied a non-random error process. Out of the 10 diode locations measured, ion chamber measurements were all within 2.2% error relative to the TPS and had a mean error of 1.2%. ArcCHECK measurements ranged from 4.5% to over 15% error relative to the TPS and had a mean error of 8.0%. Conclusion: The ArcCHECK performs well for quality assurance on the ViewRay under most circumstances. However, under certain conditions the absolute dose readings are significantly higher compared to the planned doses. As the ion chamber measurements consistently agree with the TPS, it can be concluded that the discrepancies are due to ArcCHECK measurement error and not TPS or delivery system error. This work was funded by the Bhudatt Paliwal Professorship and the University of Wisconsin Medical Radiation Research Center.« less
Microgrid Enabled Distributed Energy Solutions (MEDES) Fort Bliss Military Reservation
2014-02-01
Logic Controller PF Power Factor PO Performance Objectives PPA Power Purchase Agreements PV Photovoltaic R&D Research and Development RDSI...controller, algorithms perform power flow analysis, short term optimization, and long-term forecasted planning. The power flow analysis ensures...renewable photovoltaic power and energy storage in this microgrid configuration, the available mission operational time of the backup generator can be
Performance evaluation of existing building structure with pushover analysis
NASA Astrophysics Data System (ADS)
Handana, MAP; Karolina, R.; Steven
2018-02-01
In the management of the infrastructure of the building, during the period of buildings common building damage as a result of several reasons, earthquakes are common. The building is planned to work for a certain service life. But during the certain service life, the building vulnerable to damage due to various things. Any damage to cultivate can be detected as early as possible, because the damage could spread, triggering and exacerbating the latest. The newest concept to earthquake engineering is Performance Based Earthquake Engineering (PBEE). PBEE divided into two, namely Performance Based Seismic Design (PBSD) and Performance Based Seismic Evaluation (PBSE). Evaluation on PBSE one of which is the analysis of nonlinear pushover. Pushover analysis is a static analysis of nonlinear where the influence of the earthquake plan on building structure is considered as burdens static catch at the center of mass of each floor, which it was increased gradually until the loading causing the melting (plastic hinge) first within the building structure, then the load increases further changes the shapes of post-elastic large it reached the condition of elastic. Then followed melting (plastic hinge) in the location of the other structured.
2004-04-01
Management, Vol. 22, No. 3, Fall 1986, pp. 2–7. Hamel, G., and C. K. Prahaled, “ Strategic Intent ,” Harvard Business Review, May-June 1989, pp. 63–76...PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Department of the AIr Force, Strategic Planning Division,Directorate of Plans,Washington,DC,20330 8...Contract F49642-01-C-0003. Further information may be obtained from the Strategic Planning Division, Directorate of Plans, Hq USAF. iii PREFACE A growing
NASA Astrophysics Data System (ADS)
Pyakuryal, Anil
2009-05-01
Studies have shown that as many as 8 out of 10 men had prostate cancer by age 80.Prostate cancer begins with small changes (prostatic intraepithelial neoplasia(PIN)) in size and shape of prostate gland cells,known as prostate adenocarcinoma.With advent in technology, prostate cancer has been the most widely used application of IMRT with the longest follow-up periods.Prostate cancer fits the ideal target criteria for IMRT of adjacent sensitive dose-limiting tissue (rectal, bladder).A retrospective study was performed on 10 prostate cancer patients treated with radiation to a limited pelvic field with a standard 4 field arrangements at dose 45 Gy, and an IMRT boost field to a total isocenter dose of 75 Gy.Plans were simulated for 4 field and the supplementary IMRT treatments with proposed dose delivery at 1.5 Gy/fraction in BID basis.An automated DVH analysis software, HART (S. Jang et al., 2008,Med Phys 35,p.2812)was used to perform DVH assessments in IMRT plans.A statistical analysis of dose coverage at targets in prostate gland and neighboring critical organs,and the plan indices(homogeneity, conformality etc) evaluations were also performed using HART extracted DVH statistics.Analyzed results showed a better correlation with the proposed outcomes (TCP, NTCP) of the treatments.
Battling Arrow's Paradox to Discover Robust Water Management Alternatives
NASA Astrophysics Data System (ADS)
Kasprzyk, J. R.; Reed, P. M.; Hadka, D.
2013-12-01
This study explores whether or not Arrow's Impossibility Theorem, a theory of social choice, affects the formulation of water resources systems planning problems. The theorem discusses creating an aggregation function for voters choosing from more than three alternatives for society. The Impossibility Theorem is also called Arrow's Paradox, because when trying to add more voters, a single individual's preference will dictate the optimal group decision. In the context of water resources planning, our study is motivated by recent theoretical work that has generalized the insights for Arrow's Paradox to the design of complex engineered systems. In this framing of the paradox, states of society are equivalent to water planning or design alternatives, and the voters are equivalent to multiple planning objectives (e.g. minimizing cost or maximizing performance). Seen from this point of view, multi-objective water planning problems are functionally equivalent to the social choice problem described above. Traditional solutions to such multi-objective problems aggregate multiple performance measures into a single mathematical objective. The Theorem implies that a subset of performance concerns will inadvertently dictate the overall design evaluations in unpredictable ways using such an aggregation. We suggest that instead of aggregation, an explicit many-objective approach to water planning can help overcome the challenges posed by Arrow's Paradox. Many-objective planning explicitly disaggregates measures of performance while supporting the discovery of the planning tradeoffs, employing multiobjective evolutionary algorithms (MOEAs) to find solutions. Using MOEA-based search to address Arrow's Paradox requires that the MOEAs perform robustly with increasing problem complexity, such as adding additional objectives and/or decisions. This study uses comprehensive diagnostic evaluation of MOEA search performance across multiple problem formulations (both aggregated and many-objective) to show whether or not aggregating performance measures biases decision making. In this study, we explore this hypothesis using an urban water portfolio management case study in the Lower Rio Grande Valley. The diagnostic analysis shows that modern self-adaptive MOEA search is efficient, effective, and reliable for the more complex many-objective LRGV planning formulations. Results indicate that although many classical water systems planning frameworks seek to account for multiple objectives, the common practice of reducing the problem into one or more highly aggregated performance measures can severely and negatively bias planning decisions.
Final report : oceanic surveillance and navigation analysis, FY 71.
DOT National Transportation Integrated Search
1971-06-01
The report summarizes the oceanic surveillance and navigation analysis performed at Transportation Systems Center under PPA FA-04 for FY 71. Three major efforts are reviewed and discussed herein: summary of the North Atlantic Systems Planning Group c...
Discusses how a person can perform waste analyses and develop waste analysis plans (WAPs) in accordance with the federal hazardous waste regulations of the Resource Conservation and Recovery Act (RCRA)
2012 Eco-Logical grant program annual report
DOT National Transportation Integrated Search
2000-01-01
What is IDAS? IDAS, which stands for the ITS Deployment Analysis System, is software developed by the Federal Highway Administration that can be used to perform sketch planning analysis for ITS deployments. Planners and others can use IDAS to calcula...
An Evidence-Based Videotaped Running Biomechanics Analysis.
Souza, Richard B
2016-02-01
Running biomechanics play an important role in the development of injuries. Performing a running biomechanics analysis on injured runners can help to develop treatment strategies. This article provides a framework for a systematic video-based running biomechanics analysis plan based on the current evidence on running injuries, using 2-dimensional (2D) video and readily available tools. Fourteen measurements are proposed in this analysis plan from lateral and posterior video. Identifying simple 2D surrogates for 3D biomechanic variables of interest allows for widespread translation of best practices, and have the best opportunity to impact the highly prevalent problem of the injured runner. Copyright © 2016 Elsevier Inc. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant, C W; Lenderman, J S; Gansemer, J D
This document is an update to the 'ADIS Algorithm Evaluation Project Plan' specified in the Statement of Work for the US-VISIT Identity Matching Algorithm Evaluation Program, as deliverable II.D.1. The original plan was delivered in August 2010. This document modifies the plan to reflect modified deliverables reflecting delays in obtaining a database refresh. This document describes the revised schedule of the program deliverables. The detailed description of the processes used, the statistical analysis processes and the results of the statistical analysis will be described fully in the program deliverables. The US-VISIT Identity Matching Algorithm Evaluation Program is work performed bymore » Lawrence Livermore National Laboratory (LLNL) under IAA HSHQVT-07-X-00002 P00004 from the Department of Homeland Security (DHS).« less
Operational modes, health, and status monitoring
NASA Astrophysics Data System (ADS)
Taljaard, Corrie
2016-08-01
System Engineers must fully understand the system, its support system and operational environment to optimise the design. Operations and Support Managers must also identify the correct metrics to measure the performance and to manage the operations and support organisation. Reliability Engineering and Support Analysis provide methods to design a Support System and to optimise the Availability of a complex system. Availability modelling and Failure Analysis during the design is intended to influence the design and to develop an optimum maintenance plan for a system. The remote site locations of the SKA Telescopes place emphasis on availability, failure identification and fault isolation. This paper discusses the use of Failure Analysis and a Support Database to design a Support and Maintenance plan for the SKA Telescopes. It also describes the use of modelling to develop an availability dashboard and performance metrics.
The Effect of Ship Inherent Controllability on Piloted Performance: The Simulator Experiment
1990-10-01
planned analysis that would look for a dependence of the piloted maneuvers on the inherent controllability of the ships, the transit ccnditions and pilot...instructions were planned to sample the maneuvers needed in a narrow channel. Each run was initialized with the ship to the right of the channel...to Navigation Systems Design Manual for Restricted Waterways," (Smith et al., 1985). As of this writing this revision is planned for calendar year 1991
Multi-community command and control systems in law enforcement: An introductory planning guide
NASA Technical Reports Server (NTRS)
Sohn, R. L.; Garcia, E. A.; Kennedy, R. D.
1976-01-01
A set of planning guidelines for multi-community command and control systems in law enforcement is presented. Essential characteristics and applications of these systems are outlined. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. Program management techniques and joint powers agreements for multicommunity programs are discussed in detail. A description of a typical multi-community computer-aided dispatch system is appended.
Hierarchical Task Analysis and Training Decisions.
ERIC Educational Resources Information Center
Shepherd, A.
1985-01-01
Hierarchical task analysis (HTA), which requires description of a task in terms of a hierarchy of operations and plans, is reviewed and examined as a basis for making training decisions. Benefits of HTA in terms of economy of analysis and as a means of accounting for complex performance are outlined. (Author/MBR)
SSL Pricing and Efficacy Trend Analysis for Utility Program Planning
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tuenge, J. R.
2013-10-01
Report to help utilities and energy efficiency organizations forecast the order in which important SSL applications will become cost-effective and estimate when each "tipping point" will be reached. Includes performance trend analysis from DOE's LED Lighting Facts® and CALiPER programs plus cost analysis from various sources.
State landscape in public health planning and quality improvement: results of the ASTHO survey.
Madamala, Kusuma; Sellers, Katie; Pearsol, Jim; Dickey, Michael; Jarris, Paul E
2010-01-01
Limited data exist on state public health agencies and their use of planning and quality improvement (QI) initiatives. Using the 2007 Association of State and Territorial Health Officials (ASTHO) State Public Health Survey, this article describes how state public health agencies perform tasks related to planning, performance management (PM), and QI. While 82 percent of respondents report having a QI process in place, only 9.8 percent have it fully implemented departmentwide. Seventy-six percent reported having a PM process in place, with 16 percent (n = 8) having it fully implemented departmentwide. A state health improvement plan was used by 80.4 percent of respondents, with 56.9 percent of respondents completing the plan more than 3 years ago. More than two-thirds (68.2%) of the respondents developed the plan by using results of their state health assessment. Analysis of state health department level planning, PM, and QI initiatives can inform states' efforts to ready themselves to meet the proposed national voluntary accreditation standards of the Public Health Accreditation Board.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-06
... input options commensurate with the Regulatory Modeling Guidance. Perform current and post control.... Table 2--Post-Control Modeling Results \\4\\ Sanders lead facility Max 3-mth Background Total Year maximum...\\ (Facility MET data). The post-control analysis resulted in a predicted impact of 0.15 [mu]g/m\\3\\ (NWS MET...
NASA Astrophysics Data System (ADS)
Bereskie, Ty; Rodriguez, Manuel J.; Sadiq, Rehan
2017-08-01
Drinking water management in Canada is complex, with a decentralized, three-tiered governance structure responsible for safe drinking water throughout the country. The current approach has been described as fragmented, leading to governance gaps, duplication of efforts, and an absence of accountability and enforcement. Although there have been no major waterborne disease outbreaks in Canada since 2001, a lack of performance improvement, especially in small drinking water systems, is evident. The World Health Organization water safety plan approach for drinking water management represents an alternative preventative management framework to the current conventional, reactive drinking water management strategies. This approach has seen successful implementation throughout the world and has the potential to address many of the issues with drinking water management in Canada. This paper presents a review and strengths-weaknesses-opportunities-threats analysis of drinking water management and governance in Canada at the federal, provincial/territorial, and municipal levels. Based on this analysis, a modified water safety plan (defined as the plan-do-check-act (PDCA)-WSP framework) is proposed, established from water safety plan recommendations and the principles of PDCA for continuous performance improvement. This proposed framework is designed to strengthen current drinking water management in Canada and is designed to fit within and incorporate the existing governance structure.
Bereskie, Ty; Rodriguez, Manuel J; Sadiq, Rehan
2017-08-01
Drinking water management in Canada is complex, with a decentralized, three-tiered governance structure responsible for safe drinking water throughout the country. The current approach has been described as fragmented, leading to governance gaps, duplication of efforts, and an absence of accountability and enforcement. Although there have been no major waterborne disease outbreaks in Canada since 2001, a lack of performance improvement, especially in small drinking water systems, is evident. The World Health Organization water safety plan approach for drinking water management represents an alternative preventative management framework to the current conventional, reactive drinking water management strategies. This approach has seen successful implementation throughout the world and has the potential to address many of the issues with drinking water management in Canada. This paper presents a review and strengths-weaknesses-opportunities-threats analysis of drinking water management and governance in Canada at the federal, provincial/territorial, and municipal levels. Based on this analysis, a modified water safety plan (defined as the plan-do-check-act (PDCA)-WSP framework) is proposed, established from water safety plan recommendations and the principles of PDCA for continuous performance improvement. This proposed framework is designed to strengthen current drinking water management in Canada and is designed to fit within and incorporate the existing governance structure.
1994-03-01
asked whether the planned structure considered (a) all objectives, (b) all functions, (c) all relevant units of analysis such as the plant , the...literature and provides an integrative model of design for high perfor-ming organizations. The model is based on an analysis of current theories of...important midrange theories underlie much of the work on organizational analysis . 0 Systems Approaches. These approaches emphasize the rational, goal
Life Cycle Costing: A Working Level Approach
1981-06-01
Effects Analysis ( FMEA ) ...... ................ .. 59 Logistics Performance Factors (LPFs) 60 Planning the Use of Life Cycle Cost in the Demonstration...form. Failure Mode and Effects Analysis ( FMEA ). Description. FMEA is a technique that attempts to improve the design of any particular unit. The FMEA ...failure modes and also eliminate extra parts or ones that are used to achieve more performance than is necessary (16:5-14]. Advantages. FMEA forces
The Situation Analysis Study of the family planning program in Kenya.
Miller, R A; Ndhlovu, L; Gachara, M M; Fisher, A A
1991-01-01
A new, relatively "quick and clean" operations research approach called a "situation analysis" was developed for examining the strengths and weaknesses of the family planning program of Kenya. Field research teams visited a stratified random sample of 99 of the Ministry of Health's approximately 775 service delivery points. Observation techniques and interviewing were used to collect information on program components and on the quality of care provided to new family planning clients during the observation day. As late as 1986, the Kenya program was rated "weak" and "poor" in the international literature. The Kenya Situation Analysis Study found a functioning, integrated maternal and child health/family planning program serving large numbers of clients, with an emphasis on oral contraceptives and Depo-Provera (and an underemphasis on permanent methods). Although a number of program problems were revealed by the study, overall, in terms of performance, a rating of "moderate" is suggested as more appropriate for Kenya's national family planning program today. In terms of the quality of care, a "moderate to moderate-high" rating is suggested.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Desai, V; Labby, Z; Culberson, W
Purpose: To determine whether body site-specific treatment plans form unique “plan class” clusters in a multi-dimensional analysis of plan complexity metrics such that a single beam quality correction determined for a representative plan could be universally applied within the “plan class”, thereby increasing the dosimetric accuracy of a detector’s response within a subset of similarly modulated nonstandard deliveries. Methods: We collected 95 clinical volumetric modulated arc therapy (VMAT) plans from four body sites (brain, lung, prostate, and spine). The lung data was further subdivided into SBRT and non-SBRT data for a total of five plan classes. For each control pointmore » in each plan, a variety of aperture-based complexity metrics were calculated and stored as unique characteristics of each patient plan. A multiple comparison of means analysis was performed such that every plan class was compared to every other plan class for every complexity metric in order to determine which groups could be considered different from one another. Statistical significance was assessed after correcting for multiple hypothesis testing. Results: Six out of a possible 10 pairwise plan class comparisons were uniquely distinguished based on at least nine out of 14 of the proposed metrics (Brain/Lung, Brain/SBRT lung, Lung/Prostate, Lung/SBRT Lung, Lung/Spine, Prostate/SBRT Lung). Eight out of 14 of the complexity metrics could distinguish at least six out of the possible 10 pairwise plan class comparisons. Conclusion: Aperture-based complexity metrics could prove to be useful tools to quantitatively describe a distinct class of treatment plans. Certain plan-averaged complexity metrics could be considered unique characteristics of a particular plan. A new approach to generating plan-class specific reference (pcsr) fields could be established through a targeted preservation of select complexity metrics or a clustering algorithm that identifies plans exhibiting similar modulation characteristics. Measurements and simulations will better elucidate potential plan-class specific dosimetry correction factors.« less
2006-12-01
warfighters requirements and identifies system performance short-comings over its life cycle. 15. NUMBER OF PAGES 89 14. SUBJECT TERMS Information...the system performs to warfighters requirements and identifies system performance short-comings over its life cycle. vi...3 II. DEFENSE ACQUISITION LIFE CYCLE CURRENT STAGE ANALYSIS.......5 A. INTRODUCTION
MO-D-213-05: Sensitivity of Routine IMRT QA Metrics to Couch and Collimator Rotations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alaei, P
Purpose: To assess the sensitivity of gamma index and other IMRT QA metrics to couch and collimator rotations. Methods: Two brain IMRT plans with couch and/or collimator rotations in one or more of the fields were evaluated using the IBA MatriXX ion chamber array and its associated software (OmniPro-I’mRT). The plans were subjected to routine QA by 1) Creating a composite planar dose in the treatment planning system (TPS) with the couch/collimator rotations and 2) Creating the planar dose after “zeroing” the rotations. Plan deliveries to MatriXX were performed with all rotations set to zero on a Varian 21ex linearmore » accelerator. This in effect created TPS-created planar doses with an induced rotation error. Point dose measurements for the delivered plans were also performed in a solid water phantom. Results: The IMRT QA of the plans with couch and collimator rotations showed clear discrepancies in the planar dose and 2D dose profile overlays. The gamma analysis, however, did pass with the criteria of 3%/3mm (for 95% of the points), albeit with a lower percentage pass rate, when one or two of the fields had a rotation. Similar results were obtained with tighter criteria of 2%/2mm. Other QA metrics such as percentage difference or distance-to-agreement (DTA) histograms produced similar results. The point dose measurements did not obviously indicate the error due to location of dose measurement (on the central axis) and the size of the ion chamber used (0.6 cc). Conclusion: Relying on Gamma analysis, percentage difference, or DTA to determine the passing of an IMRT QA may miss critical errors in the plan delivery due to couch/collimator rotations. A combination of analyses for composite QA plans, or per-beam analysis, would detect these errors.« less
Microarray expression technology: from start to finish.
Elvidge, Gareth
2006-01-01
The recent introduction of new microarray expression technologies and the further development of established platforms ensure that the researcher is presented with a range of options for performing an experiment. Whilst this has opened up the possibilities for future applications, such as exon-specific arrays, increased sample throughput and 'chromatin immunoprecipitation (ChIP) on chip' experiments, the initial decision processes and experiment planning are made more difficult. This review will give an overview of the various technologies that are available to perform a microarray expression experiment, from the initial planning stages through to the final data analysis. Both practical aspects and data analysis options will be considered. The relative advantages and disadvantages will be discussed with insights provided for future directions of the technology.
Network meta-analyses performed by contracting companies and commissioned by industry.
Schuit, Ewoud; Ioannidis, John Pa
2016-11-25
Industry commissions contracting companies to perform network meta-analysis for health technology assessment (HTA) and reimbursement submissions. Our objective was to estimate the number of network meta-analyses performed by consulting companies contracted by industry, to assess whether they were published, and to explore reasons for non-publication. We searched MEDLINE for network meta-analyses of randomized trials. Papers were included if they had authors affiliated with any contracting company. All identified contracting companies as well as additional ones from the list of the exhibitors at the International Society for Pharmacoeconomics and Outcomes Research, an annual meeting that representatives from many contracting companies attend and exhibit at, were surveyed regarding conduct and publication of network meta-analyses. In 162 of 822 (20%) network meta-analysis papers, authors were affiliated to 66 contracting companies. Another 36 contracting companies were identified by the exhibitors list. Three companies had no contact information and six merged with others, therefore 93 companies were contacted. Thirty seven out of ninety three (40%) companies responded, and 19 indicated that they had performed a total of 476 network meta-analyses, but only 102 (21%) papers were published. Thirteen companies that disclosed to have conducted 174 network meta-analyses (45 published) provided reasons for non-publication. Of the 129 still unpublished meta-analyses, for 40 there were plans for future publication, for 37 the sponsor did not allow publication, for 16 the contracting companies did not plan to publish the meta-analysis, for another 23 plans were unclear, and the remaining 13 were used as HTA submission. The protocol of the network meta-analysis was publically available from 11/162 (6.8%) network meta-analyses published by authors affiliated with contracting companies. There is a prolific sector of professional contracting companies that perform network meta-analyses. Industry commissions many network meta-analyses, but most are not registered before or published after analyses in the scientific literature. Mechanisms to improve publication rates of network meta-analysis commissioned by industry are warranted.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thiyagarajan, Rajesh; Karrthick, KP; Kataria, Tejinder
Purpose: Performing DQA for Bilateral (B-L) breast tomotherapy is a challenging task due to the limitation of any commercially available detector array or film. Aim of this study is to perform DQA for B-L breast tomotherapy plan using MLC fluence sinogram. Methods: Treatment plan was generated on Tomotherapy system for B-L breast tumour. B-L breast targets were given 50.4 Gy prescribed over 28 fractions. Plan is generated with 6 MV photon beam & pitch was set to 0.3. As the width of the total target is 39 cm (left & right) length is 20 cm. DQA plan delivered without anymore » phantom on the mega voltage computed tomography (MCVT) detector system. The pulses recorded by MVCT system were exported to the delivery analysis software (Tomotherapy Inc.) for reconstruction. The detector signals are reconstructed to a sonogram and converted to MLC fluence sonogram. The MLC fluence sinogram compared with the planned fluence sinogram. Also point dose measured with cheese phantom and ionization chamber to verify the absolute dose component Results: Planned fluence sinogram and reconstructed MLC fluence sinogram were compared using Gamma metric. MLC positional difference and intensity of the beamlet were used as parameters to evaluate gamma. 3 mm positional difference and 3% beamlet intensity difference were used set for gamma calculation. A total of 26784 non-zero beamlets were included in the analysis out of which 161 beamlets had gamma more than 1. The gamma passing rate found to be 99.4%. Point dose measurements were within 1.3% of the calculated dose. Conclusion: MLC fluence sinogram based delivery quality assurance performed for bilateral breast irradiation. This would be a suitable alternate for large volume targets like bilateral breast, Total body irradiation etc. However conventional method of DQA should be used to validate this method periodically.« less
Criteria for Developing a Successful Privatization Project
1989-05-01
conceptualization and planning are required when pursuing privatization projects. In fact, privatization project proponents need to know how to...selection of projects for analysis, methods of acquiring information about these projects, and the analysis framwork . Chapter IV includes the analysis. A...performed an analysis to determine cormion conceptual and creative approaches and lessons learned. This analysis was then used to develop criteria for
Solar array electrical performance assessment for Space Station Freedom
NASA Technical Reports Server (NTRS)
Smith, Bryan K.; Brisco, Holly
1993-01-01
Electrical power for Space Station Freedom will be generated by large Photovoltaic arrays with a beginning of life power requirement of 30.8 kW per array. The solar arrays will operate in a Low Earth Orbit (LEO) over a design life of fifteen years. This paper provides an analysis of the predicted solar array electrical performance over the design life and presents a summary of supporting analysis and test data for the assigned model parameters and performance loss factors. Each model parameter and loss factor is assessed based upon program requirements, component analysis, and test data to date. A description of the LMSC performance model, future test plans, and predicted performance ranges are also given.
Solar array electrical performance assessment for Space Station Freedom
NASA Technical Reports Server (NTRS)
Smith, Bryan K.; Brisco, Holly
1993-01-01
Electrical power for Space Station Freedom will be generated by large photovoltaic arrays with a beginning of life power requirement of 30.8 kW per array. The solar arrays will operate in a Low Earth Orbit (LEO) over a design life of fifteen years. This paper provides an analysis of the predicted solar array electrical performance over the design life and presents a summary of supporting analysis and test data for the assigned model parameters and performance loss factors. Each model parameter and loss factor is assessed based upon program requirements, component analysis and test data to date. A description of the LMSC performance model future test plans and predicted performance ranges are also given.
KSC management training system project
NASA Technical Reports Server (NTRS)
Sepulveda, Jose A.
1993-01-01
The stated objectives for the summer of 1993 were: to review the Individual Development Plan Surveys for 1994 in order to automate the analysis of the Needs Assessment effort; and to develop and implement evaluation methodologies to perform ongoing program-wide course-to-course assessment. This includes the following: to propose a methodology to develop and implement objective, performance-based assessment instruments for each training effort; to mechanize course evaluation forms and develop software to facilitate the data gathering, analysis, and reporting processes; and to implement the methodology, forms, and software in at lease one training course or seminar selected among those normally offered in the summer at KSC. Section two of this report addresses the work done in regard to the Individual Development Plan Surveys for 1994. Section three presents the methodology proposed to develop and implement objective, performance-based assessment instruments for each training course offered at KSC.
NASA Astrophysics Data System (ADS)
Trisutomo, S.
2017-07-01
Importance-Performance Analysis (IPA) has been widely applied in many cases. In this research, IPA was applied to measure perceive on coastal tourism objects and its possibility to be developed as coastal cruise tourism in Makassar. Three objects, i.e. Akkarena recreational site, Losari public space at waterfront, and Paotere traditional Phinisi ships port, were selected and assessed visually from water area by a group of purposive resource persons. The importance and performance of 10 attributes of each site were scored using Likert scale from 1 to 5. Data were processed by SPSS-21 than resulted Cartesian graph which the scores were divided in four quadrants: Quadrant I concentric here, Quadrant II keep up the good work, Quadrant III low priority, and Quadrant IV possible overkill. The attributes in each quadrant could be considered as the platform for preliminary planning of coastal cruise tour in Makassar
Input Range Testing for the General Mission Analysis Tool (GMAT)
NASA Technical Reports Server (NTRS)
Hughes, Steven P.
2007-01-01
This document contains a test plan for testing input values to the General Mission Analysis Tool (GMAT). The plan includes four primary types of information, which rigorously define all tests that should be performed to validate that GMAT will accept allowable inputs and deny disallowed inputs. The first is a complete list of all allowed object fields in GMAT. The second type of information, is test input to be attempted for each field. The third type of information is allowable input values for all objects fields in GMAT. The final piece of information is how GMAT should respond to both valid and invalid information. It is VERY important to note that the tests below must be performed for both the Graphical User Interface and the script!! The examples are illustrated using a scripting perspective, because it is simpler to write up. However, the test must be performed for both interfaces to GMAT.
Image-Based 3d Reconstruction and Analysis for Orthodontia
NASA Astrophysics Data System (ADS)
Knyaz, V. A.
2012-08-01
Among the main tasks of orthodontia are analysis of teeth arches and treatment planning for providing correct position for every tooth. The treatment plan is based on measurement of teeth parameters and designing perfect teeth arch curve which teeth are to create after treatment. The most common technique for teeth moving uses standard brackets which put on teeth and a wire of given shape which is clamped by these brackets for producing necessary forces to every tooth for moving it in given direction. The disadvantages of standard bracket technique are low accuracy of tooth dimensions measurements and problems with applying standard approach for wide variety of complex orthodontic cases. The image-based technique for orthodontic planning, treatment and documenting aimed at overcoming these disadvantages is proposed. The proposed approach provides performing accurate measurements of teeth parameters needed for adequate planning, designing correct teeth position and monitoring treatment process. The developed technique applies photogrammetric means for teeth arch 3D model generation, brackets position determination and teeth shifting analysis.
Extended performance solar electric propulsion thrust system study. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
Poeschel, R. L.; Hawthorne, E. I.
1977-01-01
Several thrust system design concepts were evaluated and compared using the specifications of the most advanced 30 cm engineering model thruster as the technology base. The extensions in thruster performance required for the Halley's comet mission were defined and alternative thrust system concepts were designed. Confirmation testing and analysis of thruster and power-processing components were performed, and the feasibility of satisfying extended performance requirements was verified. A baseline design was selected from the alternatives considered, and the design analysis and documentation were refined. A program development plan was formulated that outlines the work structure considered necessary for developing, qualifying, and fabricating the flight hardware for the baseline thrust system within the time frame of a project to rendezvous with Halley's comet. An assessment was made of the costs and risks associated with a baseline thrust system as provided to the mission project under this plan. Critical procurements and interfaces were identified and defined. Results are presented.
Bellec, J; Delaby, N; Jouyaux, F; Perdrieux, M; Bouvier, J; Sorel, S; Henry, O; Lafond, C
2017-07-01
Robotic radiosurgery requires plan delivery quality assurance (DQA) but there has never been a published comprehensive analysis of a patient-specific DQA process in a clinic. We proposed to evaluate 350 consecutive film-based patient-specific DQAs using statistical process control. We evaluated the performance of the process to propose achievable tolerance criteria for DQA validation and we sought to identify suboptimal DQA using control charts. DQAs were performed on a CyberKnife-M6 using Gafchromic-EBT3 films. The signal-to-dose conversion was performed using a multichannel-correction and a scanning protocol that combined measurement and calibration in a single scan. The DQA analysis comprised a gamma-index analysis at 3%/1.5mm and a separate evaluation of spatial and dosimetric accuracy of the plan delivery. Each parameter was plotted on a control chart and control limits were calculated. A capability index (Cpm) was calculated to evaluate the ability of the process to produce results within specifications. The analysis of capability showed that a gamma pass rate of 85% at 3%/1.5mm was highly achievable as acceptance criteria for DQA validation using a film-based protocol (Cpm>1.33). 3.4% of DQA were outside a control limit of 88% for gamma pass-rate. The analysis of the out-of-control DQA helped identify a dosimetric error in our institute for a specific treatment type. We have defined initial tolerance criteria for DQA validations. We have shown that the implementation of a film-based patient-specific DQA protocol with the use of control charts is an effective method to improve patient treatment safety on CyberKnife. Copyright © 2017 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Schyns, Lotte E. J. R.; Persoon, Lucas C. G. G.; Podesta, Mark; van Elmpt, Wouter J. C.; Verhaegen, Frank
2016-05-01
The aim of this work is to compare time-resolved (TR) and time-integrated (TI) portal dosimetry, focussing on the role of an object’s position with respect to the isocenter in volumetric modulated arc therapy (VMAT). Portal dose images (PDIs) are simulated and measured for different cases: a sphere (1), a bovine bone (2) and a patient geometry (3). For the simulated case (1) and the experimental case (2), several transformations are applied at different off-axis positions. In the patient case (3), three simple plans with different isocenters are created and pleural effusion is simulated in the patient. The PDIs before and after the sphere transformations, as well as the PDIs with and without simulated pleural effusion, are compared using a TI and TR gamma analysis. In addition, the performance of the TI and TR gamma analyses for the detection of real geometric changes in patients treated with clinical plans is investigated and a correlation analysis is performed between gamma fail rates and differences in dose volume histogram (DVH) metrics. The TI gamma analysis can show large differences in gamma fail rates for the same transformation at different off-axis positions (or for different plan isocenters). The TR gamma analysis, however, shows consistent gamma fail rates. For the detection of real geometric changes in patients treated with clinical plans, the TR gamma analysis has a higher sensitivity than the TI gamma analysis. However, the specificity for the TR gamma analysis is lower than for the TI gamma analysis. Both the TI and TR gamma fail rates show no correlation with changes in DVH metrics. This work shows that TR portal dosimetry is fundamentally superior to TI portal dosimetry, because it removes the strong dependence of the gamma fail rate on the off-axis position/plan isocenter. However, for 2D TR portal dosimetry, it is still difficult to interpret gamma fail rates in terms of changes in DVH metrics for patients treated with VMAT.
Step 1: C3 Flight Demo Data Analysis Plan
NASA Technical Reports Server (NTRS)
2005-01-01
The Data Analysis Plan (DAP) describes the data analysis that the C3 Work Package (WP) will perform in support of the Access 5 Step 1 C3 flight demonstration objectives as well as the processes that will be used by the Flight IPT to gather and distribute the data collected to satisfy those objectives. In addition to C3 requirements, this document will encompass some Human Systems Interface (HSI) requirements in performing the C3 flight demonstrations. The C3 DAP will be used as the primary interface requirements document between the C3 Work Package and Flight Test organizations (Flight IPT and Non-Access 5 Flight Programs). In addition to providing data requirements for Access 5 flight test (piggyback technology demonstration flights, dedicated C3 technology demonstration flights, and Airspace Operations Demonstration flights), the C3 DAP will be used to request flight data from Non- Access 5 flight programs for C3 related data products
Integrated analysis of large space systems
NASA Technical Reports Server (NTRS)
Young, J. P.
1980-01-01
Based on the belief that actual flight hardware development of large space systems will necessitate a formalized method of integrating the various engineering discipline analyses, an efficient highly user oriented software system capable of performing interdisciplinary design analyses with tolerable solution turnaround time is planned Specific analysis capability goals were set forth with initial emphasis given to sequential and quasi-static thermal/structural analysis and fully coupled structural/control system analysis. Subsequently, the IAC would be expanded to include a fully coupled thermal/structural/control system, electromagnetic radiation, and optical performance analyses.
Multilevel semantic analysis and problem-solving in the flight-domain
NASA Technical Reports Server (NTRS)
Chien, R. T.
1982-01-01
The use of knowledge-base architecture and planning control; mechanisms to perform an intelligent monitoring task in the flight domain is addressed. The route level, the trajectory level, and parts of the aerodynamics level are demonstrated. Hierarchical planning and monitoring conceptual levels, functional-directed mechanism rationalization, and using deep-level mechanism models for diagnoses of dependent failures are discussed.
ERIC Educational Resources Information Center
Pongsophon, Pongprapan; Herman, Benjamin C.
2017-01-01
Given the abundance of literature describing the strong relationship between inquiry-based teaching and student achievement, more should be known about the factors impacting science teachers' classroom inquiry implementation. This study utilises the theory of planned behaviour to propose and validate a causal model of inquiry-based teaching…
Project resources planning and control
NASA Technical Reports Server (NTRS)
Sibbers, C. W.
1984-01-01
This report contains instructional guidelines for the resources planning and control of research and development (R&D) projects managed by NASA's Langley Research Center (LaRC). Although written to serve primarily as a practical guide and reference for those LaRC personnel who perform resources planning, analysis, control, and reporting functions, it should also be meaningful to other NASA personnel who are directly or indirectly involved in or affected by these functions, especially project technical managers whose responsibilities include resources management. Certain sections should help Contractor personnel to better understand what resources information must usually be submitted on LaRC projects and what use is made of such information. The Project Manager of a large R&D project typicaly receives support from an Analyst in the area of resources management. The Analyst provides assistance in four functional areas: Planning, Analysis/Control, Administration, and Reporting. Each of these functions are discussed in detail. Examples of techniques used effectively on LaRC projects have been included where applicable. A considerable amount of information has been included on the use of Performance Measurement (Earned Value) Systems for contract cost control and reporting as little information is currently available on this subject in NASA publications.
SU-E-T-77: Comparison of 2D and 3D Gamma Analysis in Patient-Specific QA for Prostate VMAT Plans
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clemente, F; Perez, C
2014-06-01
Purpose: Patient-specific QA procedures for IMRT and VMAT are traditionally performed by comparing TPS calculations with measured single point values and plane dose distributions by means of gamma analysis. New QA devices permit us to calculate 3D dose distributions on patient anatomy as redundant secondary check and reconstruct it from measurements taken with 2D and 3D detector arrays. 3D dose calculations allow us to perform DVH-based comparisons with clinical relevance, as well as 3D gamma analysis. One of these systems (Compass, IBA Dosimetry) combines traditional 2D with new anatomical-based 3D gamma analysis. This work shows the ability of this systemmore » by comparing 2D and 3D gamma analysis in pre-treatment QA for several VMAT prostate plans. Methods: Compass is capable of calculating dose as secondary check from DICOM TPS data and reconstructing it from measurements taken by a 2D ion chamber array (MatriXX Evolution, IBA Dosimetry). Both 2D and 3D gamma tests are available to compare calculated and reconstructed dose in Compass with TPS RT Dose. Results: 15 VMAT prostate plans have been measured with Compass. Dose is reconstructed with Compass for these plans. 2D gamma comparisons can be done for any plane from dose matrix. Mean gamma passing rates for isocenter planes (axial, coronal, sagittal) are (99.7±0.2)%, (99.9±0.1)%, (99.9±0.1)% for reconstructed dose planes. 3D mean gamma passing rates are (98.5±1.7)% for PTVs, (99.1±1.5)% for rectum, (100.0±0.0)% for bladder, (99.6±0.7)% for femoral heads and (98.1±4.1)% for penile bulb. Conclusion: Compass is a powerful tool to perform a complete pre-treatment QA analysis, from 2D techniques to 3D DVH-based techniques with clinical relevance. All reported values for VMAT prostate plans are in good agreement with TPS values. This system permits us to ensure the accuracy in the delivery of VMAT treatments completing a full patient-specific QA program.« less
Space Shuttle Communications Coverage Analysis for Thermal Tile Inspection
NASA Technical Reports Server (NTRS)
Kroll, Quin D.; Hwu, Shian U.; Upanavage, Matthew; Boster, John P.; Chavez, Mark A.
2009-01-01
The space shuttle ultra-high frequency Space-to-Space Communication System has to provide adequate communication coverage for astronauts who are performing thermal tile inspection and repair on the underside of the space shuttle orbiter (SSO). Careful planning and quantitative assessment are necessary to ensure successful system operations and mission safety in this work environment. This study assesses communication systems performance for astronauts who are working in the underside, non-line-of-sight shadow region on the space shuttle. All of the space shuttle and International Space Station (ISS) transmitting antennas are blocked by the SSO structure. To ensure communication coverage at planned inspection worksites, the signal strength and link margin between the SSO/ISS antennas and the extravehicular activity astronauts, whose line-of-sight is blocked by vehicle structure, was analyzed. Investigations were performed using rigorous computational electromagnetic modeling techniques. Signal strength was obtained by computing the reflected and diffracted fields along the signal propagation paths between transmitting and receiving antennas. Radio frequency (RF) coverage was determined for thermal tile inspection and repair missions using the results of this computation. Analysis results from this paper are important in formulating the limits on reliable communication range and RF coverage at planned underside inspection and repair worksites.
Department of Defense Technology Transfer (T2) Program
2014-04-08
January February (1st Monday) Disposal System Performance Spec Production Representative Articles CARD – Cost Analysis Requirements Description CCE...Supportability Objectives Exit Criteria Met APB MTA FMECA FTA LORA RCM MS B Threshold/objective tradeoffs – Revised Performance Attributes MS C MS A...Evaluation FTA – Failure Tree Analysis IOT&E – Initial Operational Test & Evaluation ISR – In-Service Review ISP – Information Support Plan ITR – Initial
Oxygen beams for therapy: advanced biological treatment planning and experimental verification
NASA Astrophysics Data System (ADS)
Sokol, O.; Scifoni, E.; Tinganelli, W.; Kraft-Weyrather, W.; Wiedemann, J.; Maier, A.; Boscolo, D.; Friedrich, T.; Brons, S.; Durante, M.; Krämer, M.
2017-10-01
Nowadays there is a rising interest towards exploiting new therapeutical beams beyond carbon ions and protons. In particular, 16 O ions are being widely discussed due to their increased LET distribution. In this contribution, we report on the first experimental verification of biologically optimized treatment plans, accounting for different biological effects, generated with the TRiP98 planning system with 16 O beams, performed at HIT and GSI. This implies the measurements of 3D profiles of absorbed dose as well as several biological measurements. The latter includes the measurements of relative biological effectiveness along the range of linear energy transfer values from ≈20 up to ≈750 keV μ m-1 , oxygen enhancement ratio values and the verification of the kill-painting approach, to overcome hypoxia, with a phantom imitating an unevenly oxygenated target. With the present implementation, our treatment planning system is able to perform a comparative analysis of different ions, according to any given condition of the target. For the particular cases of low target oxygenation, 16 O ions demonstrate a higher peak-to-entrance dose ratio for the same cell killing in the target region compared to 12 C ions. Based on this phenomenon, we performed a short computational analysis to reveal the potential range of treatment plans, where 16 O can benefit over lighter modalities. It emerges that for more hypoxic target regions (partial oxygen pressure of ≈0.15% or lower) and relatively low doses (≈4 Gy or lower) the choice of 16 O over 12 C or 4 He may be justified.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, B; Vancouver Cancer Centre, Vancouver, BC; Gete, E
2016-06-15
Purpose: This work investigates the dosimetric accuracy of a trajectory based delivery technique in which an optimized radiation beam is delivered along a Couch-Gantry trajectory that is formed by simultaneous rotation of the linac gantry and the treatment couch. Methods: Nine trajectory based cranial SRS treatment plans were created using in-house optimization software. The plans were calculated for delivery on the TrueBeam STx linac with 6MV photon beam. Dose optimization was performed along a user-defined trajectory using MLC modulation, dose rate modulation and jaw tracking. The pre-defined trajectory chosen for this study is formed by a couch rotation through itsmore » full range of 180 degrees while the gantry makes four partial arc sweeps which are 170 degrees each. For final dose calculation, the trajectory based plans were exported to the Varian Eclipse Treatment Planning System. The plans were calculated on a homogeneous cube phantom measuring 18.2×18.2×18.2 cm3 with the analytical anisotropic algorithm (AAA) using a 1mm3 calculation voxel. The plans were delivered on the TrueBeam linac via the developer’s mode. Point dose measurements were performed on 9 patients with the IBA CC01 mini-chamber with a sensitive volume of 0.01 cc. Gafchromic film measurements along the sagittal and coronal planes were performed on three of the 9 treatment plans. Point dose values were compared with ion chamber measurements. Gamma analysis comparing film measurement and AAA calculations was performed using FilmQA Pro. Results: The AAA calculations and measurements were in good agreement. The point dose difference between AAA and ion chamber measurements were within 2.2%. Gamma analysis test pass rates (2%, 2mm passing criteria) for the Gafchromic film measurements were >95%. Conclusion: We have successfully tested TrueBeam’s ability to deliver accurate trajectory based treatments involving simultaneous gantry and couch rotation with MLC and dose rate modulation along the trajectory.« less
CALS Baseline Architecture Analysis of Weapons System. Technical Information: Army, Draft. Volume 8
DOT National Transportation Integrated Search
1989-09-01
This effort was performed to provide a common framework for analysis and planning of CALS initiatives across the military services, leading eventually to the development of a common DoD-wide architecture for CALS. This study addresses Army technical ...
Tank 241-AP-103 08/1999 Compatibility Grab Samples and Analytical Results for the Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
BELL, K.E.
1999-12-09
This document is the format IV, final report for the tank 241-AP-103 (AP-103) grab samples taken in August 1999 to address waste compatibility concerns. Chemical, radiochemical, and physical analyses on the tank AP-103 samples were performed as directed in ''Compatibility Grub Sampling and Analysis Plan for Fiscal Year 1999'' (Sasaki 1999a). Any deviations from the instructions provided in the tank sampling and analysis plan (TSAP) were discussed in this narrative. No notification limits were exceeded.
An Analysis of States' FFY 2011 Annual Performance Report Data for Indicator B1 (Graduation)
ERIC Educational Resources Information Center
National Dropout Prevention Center for Students with Disabilities, 2013
2013-01-01
The National Dropout Prevention Center for Students with Disabilities (NDPC-SD) was assigned the task of compiling, analyzing, and summarizing the data for Indicator 1--Graduation--from the FFY 2011 Annual Performance Reports (APRs) and amended State Performance Plans (SPPs), which were submitted by states to the Office of Special Education…
Lam, Sean Shao Wei; Zhang, Ji; Zhang, Zhong Cheng; Oh, Hong Choon; Overton, Jerry; Ng, Yih Yng; Ong, Marcus Eng Hock
2015-02-01
Dynamically reassigning ambulance deployment locations throughout a day to balance ambulance availability and demands can be effective in reducing response times. The objectives of this study were to model dynamic ambulance allocation plans in Singapore based on the system status management (SSM) strategy and to evaluate the dynamic deployment plans using a discrete event simulation (DES) model. The geographical information system-based analysis and mathematical programming were used to develop the dynamic ambulance deployment plans for SSM based on ambulance calls data from January 1, 2011, to June 30, 2011. A DES model that incorporated these plans was used to compare the performance of the dynamic SSM strategy against static reallocation policies under various demands and travel time uncertainties. When the deployment plans based on the SSM strategy were followed strictly, the DES model showed that the geographical information system-based plans resulted in approximately 13-second reduction in the median response times compared to the static reallocation policy, whereas the mathematical programming-based plans resulted in approximately a 44-second reduction. The response times and coverage performances were still better than the static policy when reallocations happened for only 60% of all the recommended moves. Dynamically reassigning ambulance deployment locations based on the SSM strategy can result in superior response times and coverage performance compared to static reallocation policies even when the dynamic plans were not followed strictly. Copyright © 2014 Elsevier Inc. All rights reserved.
Geometric Reasoning for Automated Planning
NASA Technical Reports Server (NTRS)
Clement, Bradley J.; Knight, Russell L.; Broderick, Daniel
2012-01-01
An important aspect of mission planning for NASA s operation of the International Space Station is the allocation and management of space for supplies and equipment. The Stowage, Configuration Analysis, and Operations Planning teams collaborate to perform the bulk of that planning. A Geometric Reasoning Engine is developed in a way that can be shared by the teams to optimize item placement in the context of crew planning. The ISS crew spends (at the time of this writing) a third or more of their time moving supplies and equipment around. Better logistical support and optimized packing could make a significant impact on operational efficiency of the ISS. Currently, computational geometry and motion planning do not focus specifically on the optimized orientation and placement of 3D objects based on multiple distance and containment preferences and constraints. The software performs reasoning about the manipulation of 3D solid models in order to maximize an objective function based on distance. It optimizes for 3D orientation and placement. Spatial placement optimization is a general problem and can be applied to object packing or asset relocation.
NASA Technical Reports Server (NTRS)
Manford, J. S.; Bennett, G. R.
1985-01-01
The Space Station Program will incorporate analysis of operations constraints and considerations in the early design phases to avoid the need for later modifications to the Space Station for operations. The application of modern tools and administrative techniques to minimize the cost of performing effective orbital operations planning and design analysis in the preliminary design phase of the Space Station Program is discussed. Tools and techniques discussed include: approach for rigorous analysis of operations functions, use of the resources of a large computer network, and providing for efficient research and access to information.
40 CFR 60.2035 - How are these new source performance standards structured?
Code of Federal Regulations, 2010 CFR
2010-07-01
... standards structured? 60.2035 Section 60.2035 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... source performance standards contain the eleven major components listed in paragraphs (a) through (k) of this section. (a) Preconstruction siting analysis. (b) Waste management plan. (c) Operator training and...
ERIC Educational Resources Information Center
Panza, Carol M.
2001-01-01
Suggests that human performance technologists need to have an analysis approach to support the development of an appropriate set of improvement recommendations for clients and then move to an action plan to help them see results. Presents a performance improvement model and a systematic approach that considers organizational context, ownership,…
High-Performance Computing in Neuroscience for Data-Driven Discovery, Integration, and Dissemination
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bouchard, Kristofer E.; Aimone, James B.; Chun, Miyoung
A lack of coherent plans to analyze, manage, and understand data threatens the various opportunities offered by new neuro-technologies. High-performance computing will allow exploratory analysis of massive datasets stored in standardized formats, hosted in open repositories, and integrated with simulations.
High-Performance Computing in Neuroscience for Data-Driven Discovery, Integration, and Dissemination
Bouchard, Kristofer E.; Aimone, James B.; Chun, Miyoung; ...
2016-11-01
A lack of coherent plans to analyze, manage, and understand data threatens the various opportunities offered by new neuro-technologies. High-performance computing will allow exploratory analysis of massive datasets stored in standardized formats, hosted in open repositories, and integrated with simulations.
Performance of an improved first generation optical CT scanner for 3D dosimetry
NASA Astrophysics Data System (ADS)
Qian, Xin; Adamovics, John; Wuu, Cheng-Shie
2013-12-01
Performance analysis of a modified 3D dosimetry optical scanner based on the first generation optical CT scanner OCTOPUS is presented. The system consists of PRESAGE™ dosimeters, the modified 3D scanner, and a new developed in-house user control panel written in Labview program which provides more flexibility to optimize mechanical control and data acquisition technique. The total scanning time has been significantly reduced from initial 8 h to ∼2 h by using the modified scanner. The functional performance of the modified scanner has been evaluated in terms of the mechanical integrity uncertainty of the data acquisition process. Optical density distribution comparison between the modified scanner, OCTOPUS and the treatment plan system has been studied. It has been demonstrated that the agreement between the modified scanner and treatment plans is comparable with that between the OCTOPUS and treatment plans.
Investigation of automated task learning, decomposition and scheduling
NASA Technical Reports Server (NTRS)
Livingston, David L.; Serpen, Gursel; Masti, Chandrashekar L.
1990-01-01
The details and results of research conducted in the application of neural networks to task planning and decomposition are presented. Task planning and decomposition are operations that humans perform in a reasonably efficient manner. Without the use of good heuristics and usually much human interaction, automatic planners and decomposers generally do not perform well due to the intractable nature of the problems under consideration. The human-like performance of neural networks has shown promise for generating acceptable solutions to intractable problems such as planning and decomposition. This was the primary reasoning behind attempting the study. The basis for the work is the use of state machines to model tasks. State machine models provide a useful means for examining the structure of tasks since many formal techniques have been developed for their analysis and synthesis. It is the approach to integrate the strong algebraic foundations of state machines with the heretofore trial-and-error approach to neural network synthesis.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Riddle, F. J.
2003-06-26
The Automated Hazard Analysis (AHA) application is a software tool used to conduct job hazard screening and analysis of tasks to be performed in Savannah River Site facilities. The AHA application provides a systematic approach to the assessment of safety and environmental hazards associated with specific tasks, and the identification of controls regulations, and other requirements needed to perform those tasks safely. AHA is to be integrated into existing Savannah River site work control and job hazard analysis processes. Utilization of AHA will improve the consistency and completeness of hazard screening and analysis, and increase the effectiveness of the workmore » planning process.« less
Planning for execution monitoring on a planetary rover
NASA Technical Reports Server (NTRS)
Gat, Erann; Firby, R. James; Miller, David P.
1990-01-01
A planetary rover will be traversing largely unknown and often unknowable terrain. In addition to geometric obstacles such as cliffs, rocks, and holes, it may also have to deal with non-geometric hazards such as soft soil and surface breakthroughs which often cannot be detected until rover is in imminent danger. Therefore, the rover must monitor its progress throughout a traverse, making sure to stay on course and to detect and act on any previously unseen hazards. Its onboard planning system must decide what sensors to monitor, what landmarks to take position readings from, and what actions to take if something should go wrong. The planning systems being developed for the Pathfinder Planetary Rover to perform these execution monitoring tasks are discussed. This system includes a network of planners to perform path planning, expectation generation, path analysis, sensor and reaction selection, and resource allocation.
Accuracy of computer-guided implantation in a human cadaver model.
Yatzkair, Gustavo; Cheng, Alice; Brodie, Stan; Raviv, Eli; Boyan, Barbara D; Schwartz, Zvi
2015-10-01
To examine the accuracy of computer-guided implantation using a human cadaver model with reduced experimental variability. Twenty-eight (28) dental implants representing 12 clinical cases were placed in four cadaver heads using a static guided implantation template. All planning and surgeries were performed by one clinician. All radiographs and measurements were performed by two examiners. The distance of the implants from buccal and lingual bone and mesial implant or tooth was analyzed at the apical and coronal levels, and measurements were compared to the planned values. No significant differences were seen between planned and implanted measurements. Average deviation of an implant from its planning radiograph was 0.8 mm, which is within the range of variability expected from CT analysis. Guided implantation can be used safely with a margin of error of 1 mm. © 2014 The Authors. Clinical Oral Implants Research Published by John Wiley & Sons Ltd.
49 CFR Appendix D to Part 172 - Rail Risk Analysis Factors
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 2 2011-10-01 2011-10-01 false Rail Risk Analysis Factors D Appendix D to Part... REQUIREMENTS, AND SECURITY PLANS Pt. 172, App. D Appendix D to Part 172—Rail Risk Analysis Factors A. This... safety and security risk analyses required by § 172.820. The risk analysis to be performed may be...
49 CFR Appendix D to Part 172 - Rail Risk Analysis Factors
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 2 2010-10-01 2010-10-01 false Rail Risk Analysis Factors D Appendix D to Part... REQUIREMENTS, AND SECURITY PLANS Pt. 172, App. D Appendix D to Part 172—Rail Risk Analysis Factors A. This... safety and security risk analyses required by § 172.820. The risk analysis to be performed may be...
Monte Carlo based, patient-specific RapidArc QA using Linac log files.
Teke, Tony; Bergman, Alanah M; Kwa, William; Gill, Bradford; Duzenli, Cheryl; Popescu, I Antoniu
2010-01-01
A Monte Carlo (MC) based QA process to validate the dynamic beam delivery accuracy for Varian RapidArc (Varian Medical Systems, Palo Alto, CA) using Linac delivery log files (DynaLog) is presented. Using DynaLog file analysis and MC simulations, the goal of this article is to (a) confirm that adequate sampling is used in the RapidArc optimization algorithm (177 static gantry angles) and (b) to assess the physical machine performance [gantry angle and monitor unit (MU) delivery accuracy]. Ten clinically acceptable RapidArc treatment plans were generated for various tumor sites and delivered to a water-equivalent cylindrical phantom on the treatment unit. Three Monte Carlo simulations were performed to calculate dose to the CT phantom image set: (a) One using a series of static gantry angles defined by 177 control points with treatment planning system (TPS) MLC control files (planning files), (b) one using continuous gantry rotation with TPS generated MLC control files, and (c) one using continuous gantry rotation with actual Linac delivery log files. Monte Carlo simulated dose distributions are compared to both ionization chamber point measurements and with RapidArc TPS calculated doses. The 3D dose distributions were compared using a 3D gamma-factor analysis, employing a 3%/3 mm distance-to-agreement criterion. The dose difference between MC simulations, TPS, and ionization chamber point measurements was less than 2.1%. For all plans, the MC calculated 3D dose distributions agreed well with the TPS calculated doses (gamma-factor values were less than 1 for more than 95% of the points considered). Machine performance QA was supplemented with an extensive DynaLog file analysis. A DynaLog file analysis showed that leaf position errors were less than 1 mm for 94% of the time and there were no leaf errors greater than 2.5 mm. The mean standard deviation in MU and gantry angle were 0.052 MU and 0.355 degrees, respectively, for the ten cases analyzed. The accuracy and flexibility of the Monte Carlo based RapidArc QA system were demonstrated. Good machine performance and accurate dose distribution delivery of RapidArc plans were observed. The sampling used in the TPS optimization algorithm was found to be adequate.
NASA Technical Reports Server (NTRS)
Bailey, J. A.
1976-01-01
Project planning for two series of simple experiments on the effect of zero gravity on the melting and freezing of metals and nonmetals is described. The experiments will be performed in the Long Duration Exposure Facility, and their purpose will be to study: (1) the general morphology of metals and nonmetals during solidification, (2) the location of ullage space (liquid-vapor interfaces), and (3) the magnitude of surface tension driven convection during solidification of metals and nonmetals. The preliminary design of the experiments is presented. Details of the investigative approach, experimental procedure, experimental hardware, data reduction and analysis, and anticipated results are given. In addition a work plan and cost analysis are provided.
Integrated assessment of urban drainage system under the framework of uncertainty analysis.
Dong, X; Chen, J; Zeng, S; Zhao, D
2008-01-01
Due to a rapid urbanization as well as the presence of large number of aging urban infrastructures in China, the urban drainage system is facing a dual pressure of construction and renovation nationwide. This leads to the need for an integrated assessment when an urban drainage system is under planning or re-design. In this paper, an integrated assessment methodology is proposed based upon the approaches of analytic hierarchy process (AHP), uncertainty analysis, mathematical simulation of urban drainage system and fuzzy assessment. To illustrate this methodology, a case study in Shenzhen City of south China has been implemented to evaluate and compare two different urban drainage system renovation plans, i.e., the distributed plan and the centralized plan. By comparing their water quality impacts, ecological impacts, technological feasibility and economic costs, the integrated performance of the distributed plan is found to be both better and robust. The proposed methodology is also found to be both effective and practical. (c) IWA Publishing 2008.
Development of short Indonesian lesson plan to improve teacher performance
NASA Astrophysics Data System (ADS)
Yulianto, B.; Kamidjan; Ahmadi, A.; Asteria, P. V.
2018-01-01
The developmental research was motivated by the results of preliminary study through interviews, which revealed almost all of the teachers did not create lesson plan themselves. As a result of this load, the performance of the real learning in the classroom becomes inadequate. Moreover, when lesson plan was not made by teachers themselves, the learning process becomes ineffective. Therefore, this study designed to develop a prototype of the short lesson plan, in particular, Indonesian language teaching, and to investigate its effectiveness. The participants in the study were teachers who were trained through lesson study group to design short model’s lesson plan. Questionnaires and open-ended questions were used, and the quantitative and qualitative data obtained were analyzed accordingly. The analysis of the quantitative data, aided with SPSS, were frequency, percentage, and means, whereas the qualitative data were analyzed descriptively. The results showed that the teachers liked the model, and they were willing to design their own lesson plan. The observation data revealed that the classroom learning process became more interactive, and classroom atmosphere was more engaging and natural because the teachers did not stick to the lesson plan made by other teachers.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jurkovic, I; Stathakis, S; Markovic, M
Purpose: To estimate the dose distributions delivered to the patient in each treatment fraction using deformable image registration (DIR) and assess the radiobiological impact of the inter-fraction variations due to patient deformation and setup. Methods: The work is based on the cone beam CT (CBCT) images and treatment plans of two lung cancer patients. Both patients were treated with intensity modulated radiation therapy (IMRT) to 66Gy in 2Gy/fraction. The treatment plans were exported from the treatment planning system (TPS) to the Velocity AI where DIR was performed and the same deformation matrix was used for the deformation of the plannedmore » dose distribution and organ contours to each CBCT dataset. A radiobiological analysis was performed based on the radiobiological parameters of the involved organs at risk (OARs) and planning target volume (PTV). Using the complication free tumor control probability (P+) index, differences in P+ were observed between each CBCT as well as between CBCT and planning dose distributions. Results: The optimal CBCT P? values ranged from 91.6 % to 94.8 % for patient #1 and from 88.8 % to 90.6 % for patient #2. At the dose level of the clinical prescription, the CBCT P+ values ranged from 80.3% to 80.7% for patient #1 and from 80.7% to 81.0% for the patient #2. The planning CT P+ values were 81.0% and 80.7% for the two patients, respectively. These differences emphasize the significance of using the radiobiological analysis when assessing changes in the dose distribution due to the tumor motion and lung deformations. Conclusion: Daily setup variations yield to differences in the actual dose delivered versus the planned one. The observed differences were rather small when only looking at the dosimetric comparison of the dose distributions, however the radiobiology analysis was able to detect clinically relevant differences among the studied dose distributions.« less
Allsop, Jonathan E; Lawrence, Gavin P; Gray, Robert; Khan, Michael A
2017-09-01
Pressure to perform often results in decrements to both outcome accuracy and the kinematics of motor skills. Furthermore, this pressure-performance relationship is moderated by the amount of accumulated practice or the experience of the performer. However, the interactive effects of performance pressure and practice on the underlying processes of motor skills are far from clear. Movement execution involves both an offline pre-planning process and an online control process. The present experiment aimed to investigate the interaction between pressure and practice on these two motor control processes. Two groups of participants (control and pressure; N = 12 and 12, respectively) practiced a video aiming amplitude task and were transferred to either a non-pressure (control group) or a pressure condition (pressure group) both early and late in practice. Results revealed similar accuracy and movement kinematics between the control and pressure groups at early transfer. However, at late transfer, the introduction of pressure was associated with increased performance compared to control conditions. Analysis of kinematic variability throughout the movement suggested that the performance increase was due to participants adopting strategies to improve movement planning in response to pressure reducing the effectiveness of the online control system.
Chen, Yi-Jen; Liu, An; Han, Chunhui; Tsai, Peter T; Schultheiss, Timothy E; Pezner, Richard D; Vora, Nilesh; Lim, Dean; Shibata, Stephen; Kernstine, Kemp H; Wong, Jeffrey Y C
2007-01-01
We compare different radiotherapy techniques-helical tomotherapy (tomotherapy), step-and-shoot IMRT (IMRT), and 3-dimensional conformal radiotherapy (3DCRT)-for patients with mid-distal esophageal carcinoma on the basis of dosimetric analysis. Six patients with locally advanced mid-distal esophageal carcinoma were treated with neoadjuvant chemoradiation followed by surgery. Radiotherapy included 50 Gy to gross planning target volume (PTV) and 45 Gy to elective PTV in 25 fractions. Tomotherapy, IMRT, and 3DCRT plans were generated. Dose-volume histograms (DVHs), homogeneity index (HI), volumes of lung receiving more than 10, 15, or 20 Gy (V(10), V(15), V(20)), and volumes of heart receiving more than 30 or 45 Gy (V(30), V(45)) were determined. Statistical analysis was performed by paired t-tests. By isodose distributions and DVHs, tomotherapy plans showed sharper dose gradients, more conformal coverage, and better HI for both gross and elective PTVs compared with IMRT or 3DCRT plans. Mean V(20) of lung was significantly reduced in tomotherapy plans. However, tomotherapy and IMRT plans resulted in larger V(10) of lung compared to 3DCRT plans. The heart was significantly spared in tomotherapy and IMRT plans compared to 3DCRT plans in terms of V(30) and V(45). We conclude that tomotherapy plans are superior in terms of target conformity, dose homogeneity, and V(20) of lung.
ERIC Educational Resources Information Center
Kai, Jiang
2009-01-01
Accountability, which is closely related to evaluation of efficiency, effectiveness, and performance, requires proving that higher education has achieved planned results and performance in an effective manner. Highlighting efficiency and effectiveness and emphasizing results and outcomes are the basic characteristics of accountability in higher…
Pekkan, Kerem; Whited, Brian; Kanter, Kirk; Sharma, Shiva; de Zelicourt, Diane; Sundareswaran, Kartik; Frakes, David; Rossignac, Jarek; Yoganathan, Ajit P
2008-11-01
The first version of an anatomy editing/surgical planning tool (SURGEM) targeting anatomical complexity and patient-specific computational fluid dynamics (CFD) analysis is presented. Novel three-dimensional (3D) shape editing concepts and human-shape interaction technologies have been integrated to facilitate interactive surgical morphology alterations, grid generation and CFD analysis. In order to implement "manual hemodynamic optimization" at the surgery planning phase for patients with congenital heart defects, these tools are applied to design and evaluate possible modifications of patient-specific anatomies. In this context, anatomies involve complex geometric topologies and tortuous 3D blood flow pathways with multiple inlets and outlets. These tools make it possible to freely deform the lumen surface and to bend and position baffles through real-time, direct manipulation of the 3D models with both hands, thus eliminating the tedious and time-consuming phase of entering the desired geometry using traditional computer-aided design (CAD) systems. The 3D models of the modified anatomies are seamlessly exported and meshed for patient-specific CFD analysis. Free-formed anatomical modifications are quantified using an in-house skeletization based cross-sectional geometry analysis tool. Hemodynamic performance of the systematically modified anatomies is compared with the original anatomy using CFD. CFD results showed the relative importance of the various surgically created features such as pouch size, vena cave to pulmonary artery (PA) flare and PA stenosis. An interactive surgical-patch size estimator is also introduced. The combined design/analysis cycle time is used for comparing and optimizing surgical plans and improvements are tabulated. The reduced cost of patient-specific shape design and analysis process, made it possible to envision large clinical studies to assess the validity of predictive patient-specific CFD simulations. In this paper, model anatomical design studies are performed on a total of eight different complex patient specific anatomies. Using SURGEM, more than 30 new anatomical designs (or candidate configurations) are created, and the corresponding user times presented. CFD performances for eight of these candidate configurations are also presented.
NASA Technical Reports Server (NTRS)
Schunk, R. Gregory
2002-01-01
This paper presents the Modeling and Analysis of the Space Station Environment Control and Life Support System Pressure Control Pump Assembly (PCPA). The contents include: 1) Integrated PCPA/Manifold Analyses; 2) Manifold Performance Analysis; 3) PCPA Motor Heat Leak Study; and 4) Future Plans. This paper is presented in viewgraph form.
Soares, Sérgio R A; Bernardes, Ricardo S; Netto, Oscar de M Cordeiro
2002-01-01
The understanding of sanitation infrastructure, public health, and environmental relations is a fundamental assumption for planning sanitation infrastructure in urban areas. This article thus suggests elements for developing a planning model for sanitation infrastructure. The authors performed a historical survey of environmental and public health issues related to the sector, an analysis of the conceptual frameworks involving public health and sanitation systems, and a systematization of the various effects that water supply and sanitation have on public health and the environment. Evaluation of these effects should guarantee the correct analysis of possible alternatives, deal with environmental and public health objectives (the main purpose of sanitation infrastructure), and provide the most reasonable indication of actions. The suggested systematization of the sanitation systems effects in each step of their implementation is an advance considering the association between the fundamental elements for formulating a planning model for sanitation infrastructure.
Human-Automation Integration: Principle and Method for Design and Evaluation
NASA Technical Reports Server (NTRS)
Billman, Dorrit; Feary, Michael
2012-01-01
Future space missions will increasingly depend on integration of complex engineered systems with their human operators. It is important to ensure that the systems that are designed and developed do a good job of supporting the needs of the work domain. Our research investigates methods for needs analysis. We included analysis of work products (plans for regulation of the space station) as well as work processes (tasks using current software), in a case study of Attitude Determination and Control Officers (ADCO) planning work. This allows comparing how well different designs match the structure of the work to be supported. Redesigned planning software that better matches the structure of work was developed and experimentally assessed. The new prototype enabled substantially faster and more accurate performance in plan revision tasks. This success suggests the approach to needs assessment and use in design and evaluation is promising, and merits investigatation in future research.
Analysis and methodology for aeronautical systems technology program planning
NASA Technical Reports Server (NTRS)
White, M. J.; Gershkoff, I.; Lamkin, S.
1983-01-01
A structured methodology was developed that allows the generation, analysis, and rank-ordering of system concepts by their benefits and costs, indicating the preferred order of implementation. The methodology is supported by a base of data on civil transport aircraft fleet growth projections and data on aircraft performance relating the contribution of each element of the aircraft to overall performance. The performance data are used to assess the benefits of proposed concepts. The methodology includes a computer program for performing the calculations needed to rank-order the concepts and compute their cumulative benefit-to-cost ratio. The use of the methodology and supporting data is illustrated through the analysis of actual system concepts from various sources.
Ramey, Stephen James; Padgett, Kyle R; Lamichhane, Narottam; Neboori, Hanmath J; Kwon, Deukwoo; Mellon, Eric A; Brown, Karen; Duffy, Melissa; Victoria, James; Dogan, Nesrin; Portelance, Lorraine
2018-03-01
This study aims to perform a dosimetric comparison of 2 magnetic resonance (MR)-guided radiation therapy systems capable of performing online adaptive radiation therapy versus a conventional radiation therapy system for pancreas stereotactic body radiation therapy. Ten cases of patients with pancreatic adenocarcinoma previously treated in our institution were used for this analysis. MR-guided tri-cobalt 60 therapy (MR-cobalt) and MR-LINAC plans were generated and compared with conventional LINAC (volumetric modulated arc therapy) plans. The prescription dose was 40 Gy in 5 fractions covering 95% of the planning tumor volume for the 30 plans. The same organs at risk (OARs) dose constraints were used in all plans. Dose-volume-based indices were used to compare PTV coverage and OAR sparing. The conformity index of 40 Gy in 5 fractions covering 95% of the planning tumor volume demonstrated higher conformity in both LINAC-based plans compared with MR-cobalt plans. Although there was no difference in mean conformity index between LINAC and MR-LINAC plans (1.08 in both), there was a large difference between LINAC and MR-cobalt plans (1.08 vs 1.52). Overall, 79%, 72%, and 78% of critical structure dosimetric constraints were met with LINAC, MR-cobalt, and MR-LINAC plans, respectively. The MR-cobalt plans delivered more doses to all OARs compared with the LINAC plans. In contrast, the doses to the OARs of the MR-LINAC plans were similar to LINAC plans except in 2 cases: liver mean dose (MR-LINAC, 2 .8 Gy vs LINAC, 2.1 Gy) and volume of duodenum receiving at least 15 Gy (MR-LINAC, 13.2 mL vs LINAC, 15.4 mL). Both differences are likely not clinically significant. This study demonstrates that dosimetrically similar plans were achieved with conventional LINAC and MR-LINAC, whereas doses to OARs were statistically higher for MR-cobalt compared with conventional LINAC plans because of low-dose spillage. Given the improved tumor-tracking capabilities of MR-LINAC, further studies should evaluate potential benefits of adaptive radiation therapy-capable MR-guided LINAC treatment. Copyright © 2018. Published by Elsevier Inc.
ERIC Educational Resources Information Center
Stephens, Thomas W.
Ten mainstreamed learning disabled high school students received treatment with an informal assessment and an educational plan. Analysis of pre and post tests (Peabody Individual Achievement Test, Revised Piers-Harris Self-Concept Scale, and Teacher Perception Survey) indicated that Ss performed better on achievement tests, were enrolled in more…
NASA Technical Reports Server (NTRS)
Tompkins, F. G.
1983-01-01
This report presents guidance to NASA Computer security officials for developing ADP security risk management plans. The six components of the risk management process are identified and discussed. Guidance is presented on how to manage security risks that have been identified during a risk analysis performed at a data processing facility or during the security evaluation of an application system.
2011-07-01
joined the project team in the statistical and research coordination role. Dr. Collin is an employee at the University of Pittsburgh. A successful...3. Submit to Ft. Detrick Completed Milestone: Statistical analysis planning 1. Review planned data metrics and data gathering tools...approach to performance assessment for continuous quality improvement. Analyzing data with modern statistical techniques to determine the
Methodological Issues in the Study of Air Force Organizational Structures,
MOTIVATION, MORALE, PERFORMANCE(HUMAN), LEADERSHIP , SKILLS, MANAGEMENT PLANNING AND CONTROL, MODEL THEORY , SYMPOSIA...RESOURCE MANAGEMENT , *HUMAN RESOURCES, *MANPOWER UTILIZATION, *JOB ANALYSIS, *ORGANIZATIONS, STRUCTURES, PERSONNEL MANAGEMENT , DECISION MAKING
Advanced Propulsion System Studies for General Aviation Aircraft
NASA Technical Reports Server (NTRS)
Eisenberg, Joseph D. (Technical Monitor); German, Jon
2003-01-01
This final report addresses the following topics: Market Impact Analysis (1) assessment of general aviation, including commuter/regional, aircraft market impact due to incorporation of advanced technology propulsion system on acquisition and operating costs, job creation and/or manpower demand, and future fleet size; (2) selecting an aircraft and engine for the study by focusing on the next generation 19-passenger commuter and the Williams International FJ44 turbofan engine growth. Propulsion System Analysis Conducted mission analysis studies and engine cycle analysis to define a new commuter mission and required engine performance, define acquisition and operating costs and, select engine configuration and initiated preliminary design for hardware modifications required. Propulsion System Benefits (1) assessed and defined engine emissions improvements, (2) assessed and defined noise reduction potential and, (3) conducted a cost analysis impact study. Review of Relevant NASA Programs Conducted literature searches using NERAC and NASA RECON services for related technology in the emissions and acoustics area. Preliminary Technology Development Plans Defined plan to incorporate technology improvements for an FJ44-2 growth engine in performance, emissions, and noise suppression.
CFD in the context of IHPTET: The Integrated High Performance Turbine Technology Program
NASA Technical Reports Server (NTRS)
Simoneau, Robert J.; Hudson, Dale A.
1989-01-01
The Integrated High Performance Turbine Engine Technology (IHPTET) Program is an integrated DOD/NASA technology program designed to double the performance capability of today's most advanced military turbine engines as we enter the twenty-first century. Computational Fluid Dynamics (CFD) is expected to play an important role in the design/analysis of specific configurations within this complex machine. In order to do this, a plan is being developed to ensure the timely impact of CFD on IHPTET. The developing philosphy of CFD in the context of IHPTET is discussed. The key elements in the developing plan and specific examples of state-of-the-art CFD efforts which are IHPTET turbine engine relevant are discussed.
Improving energy audit process and report outcomes through planning initiatives
NASA Astrophysics Data System (ADS)
Sprau Coulter, Tabitha L.
Energy audits and energy models are an important aspect of the retrofit design process, as they provide project teams with an opportunity to evaluate a facilities current building systems' and energy performance. The information collected during an energy audit is typically used to develop an energy model and an energy audit report that are both used to assist in making decisions about the design and implementation of energy conservation measures in a facility. The current lack of energy auditing standards results in a high degree of variability in energy audit outcomes depending on the individual performing the audit. The research presented is based on the conviction that performing an energy audit and producing a value adding energy model for retrofit buildings can benefit from a revised approach. The research was divided into four phases, with the initial three phases consisting of: 1.) process mapping activity - aimed at reducing variability in the energy auditing and energy modeling process. 2.) survey analysis -- To examine the misalignment between how industry members use the top energy modeling tools compared to their intended use as defined by software representatives. 3.) sensitivity analysis -- analysis of the affect key energy modeling inputs are having on energy modeling analysis results. The initial three phases helped define the need for an improved energy audit approach that better aligns data collection with facility owners' needs and priorities. The initial three phases also assisted in the development of a multi-criteria decision support tool that incorporates a House of Quality approach to guide a pre-audit planning activity. For the fourth and final research phase explored the impacts and evaluation methods of a pre-audit planning activity using two comparative energy audits as case studies. In each case, an energy audit professionals was asked to complete an audit using their traditional methods along with an audit which involved them first participating in a pre-audit planning activity that aligned the owner's priorities with the data collection. A comparative analysis was then used to evaluate the effects of the pre-audit planning activity in developing a more strategic method for collecting data and representing findings in an energy audit report to a facility owner. The case studies demonstrated that pre-audit planning has the potential to improve the efficiency of an energy audit process through reductions in transition time waste. The cases also demonstrated the value of audit report designs that are perceived by owners to be project specific vs. generic. The research demonstrated the ability to influence and alter an auditors' behavior through participating in a pre-audit planning activity. It also shows the potential benefits of using the House of Quality as a method of aligning data collection with owner's goals and priorities to develop reports that have increased value.
NASA Technical Reports Server (NTRS)
Tahmasebi, Farhad; Pearce, Robert
2016-01-01
Description of a tool for portfolio analysis of NASA's Aeronautics research progress toward planned community strategic Outcomes is presented. For efficiency and speed, the tool takes advantage of a function developed in Excels Visual Basic for Applications. The strategic planning process for determining the community Outcomes is also briefly discussed. Stakeholder buy-in, partnership performance, progress of supporting Technical Challenges, and enablement forecast are used as the criteria for evaluating progress toward Outcomes. A few illustrative examples of using the tool are also presented.
2010-01-01
Soporte de Modelos Sistémicos: Aplicación al Sector de Desarrollo de Software de Argentina,” Tesis de PhD, Universidad Tecnológica Nacional-Facultad...with New Results 31 2.3 Other Simulation Approaches 37 Conceptual Planning , Execution, and Operation of Combat Fire Support Effectiveness: A...Figure 29: Functional Structure of Multiple Regression Model 80 Figure 30: TSP Quality Plan One 85 Figure 31: TSP Quality Plan Two 85 Figure
NASA Technical Reports Server (NTRS)
Biess, J. J.; Yu, Y.; Middlebrook, R. D.; Schoenfeld, A. D.
1974-01-01
A review is given of future power processing systems planned for the next 20 years, and the state-of-the-art of power processing design modeling and analysis techniques used to optimize power processing systems. A methodology of modeling and analysis of power processing equipment and systems has been formulated to fulfill future tradeoff studies and optimization requirements. Computer techniques were applied to simulate power processor performance and to optimize the design of power processing equipment. A program plan to systematically develop and apply the tools for power processing systems modeling and analysis is presented so that meaningful results can be obtained each year to aid the power processing system engineer and power processing equipment circuit designers in their conceptual and detail design and analysis tasks.
Motivation and Front-End Analysis.
ERIC Educational Resources Information Center
Harless, Joe
1978-01-01
Relates Front-End Analysis (FEA) to motivation by categorizing it as either Diagnostic FEA or Planning FEA. The former is used to diagnose existing problems and prescribe motivational programs; the latter assumes that motivational programs must be implemented, along with other programs, to build the optimum environment to support the performance.…
SU-F-T-586: Pre-Treatment QA of InCise2 MLC Plans On a Cyberknife-M6 Using the Delta4 System in SBRT
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schmidhalter, D; Henzen, D; Malthaner, M
Purpose: Performing pre-treatment quality assurance (QA) with the Delta4 system (ScandiDos Inc., Madison, WI) is well established for linac-based radiotherapy. This is not true when using a Cyberknife (Accuray Inc., Sunnyvale, CA) where, typically film-based QA is applied. The goal of this work was to test the feasibility to use the Delta4 system for pre-treatment QA for stereotactic body radiation therapy (SBRT) using a Cyberknife-M6 equipped with the InCise2 multileaf collimator (MLC). Methods: In order to perform measurements without accelerator pulse signal, the Tomotherapy option within the Delta4 software was used. Absolute calibration of the Delta4 phantom was performed usingmore » a 10×10 cm{sup 2} field shaped by the InCise2 MLC of the Cyberknife-M6. Five fiducials were attached to the Delta4 phantom in order to be able to track the phantom before and during measurements. For eight SBRT treatment plans (two liver, two prostate, one lung, three bone metastases) additional verification plans were recalculated on the Delta4 phantom using MultiPlan. Dicom data was exported from MultiPlan and was adapted in order to be compatible with the Delta4 software. The measured and calculated dose distributions were compared using the gamma analysis of the Delta4 system. Results: All eight SBRT plans were successfully measured with the aid of the Delta4 system. In the mean, 98.0±1.9%, 95.8±4.1% and 88.40±11.4% of measured dose points passed the gamma analysis using a global dose deviation criterion of 3% (100% corresponds to the dose maximum) and a distance-to-agreement criterion of 3 mm, 2 mm and 1 mm, respectively, and a threshold of 20%. Conclusion: Pre-treatment QA of SBRT plans using the Delta4 system on a Cyberknife-M6 is feasible. Measured dose distributions of SBRT plans showed clinically acceptable agreement with the corresponding calculated dose distributions.« less
ERIC Educational Resources Information Center
Richardson, J. Jeffrey
This paper is part of an Air Force planning effort to develop a research, development, and applications program for the use of artificial intelligence (AI) technology in three target areas: training, performance measurement, and job performance aiding. The paper is organized in five sections that (1) introduce the reader to AI and those subfields…
International Space Station Configuration Analysis and Integration
NASA Technical Reports Server (NTRS)
Anchondo, Rebekah
2016-01-01
Ambitious engineering projects, such as NASA's International Space Station (ISS), require dependable modeling, analysis, visualization, and robotics to ensure that complex mission strategies are carried out cost effectively, sustainably, and safely. Learn how Booz Allen Hamilton's Modeling, Analysis, Visualization, and Robotics Integration Center (MAVRIC) team performs engineering analysis of the ISS Configuration based primarily on the use of 3D CAD models. To support mission planning and execution, the team tracks the configuration of ISS and maintains configuration requirements to ensure operational goals are met. The MAVRIC team performs multi-disciplinary integration and trade studies to ensure future configurations meet stakeholder needs.
Kipping, Judy A; Margulies, Daniel S; Eickhoff, Simon B; Lee, Annie; Qiu, Anqi
2018-08-01
Childhood is a critical period for the development of cognitive planning. There is a lack of knowledge on its neural mechanisms in children. This study aimed to examine cerebello-cortical and cortico-cortical functional connectivity in association with planning skills in 6-year-olds (n = 76). We identified the cerebello-cortical and cortico-cortical functional networks related to cognitive planning using activation likelihood estimation (ALE) meta-analysis on existing functional imaging studies on spatial planning, and data-driven independent component analysis (ICA) of children's resting-state functional MRI (rs-fMRI). We investigated associations of cerebello-cortical and cortico-cortical functional connectivity with planning ability in 6-year-olds, as assessed using the Stockings of Cambridge task. Long-range functional connectivity of two cerebellar networks (lobules VI and lateral VIIa) with the prefrontal and premotor cortex were greater in children with poorer planning ability. In contrast, cortico-cortical association networks were not associated with the performance of planning in children. These results highlighted the key contribution of the lateral cerebello-frontal functional connectivity, but not cortico-cortical association functional connectivity, for planning ability in 6-year-olds. Our results suggested that brain adaptation to the acquisition of planning ability during childhood is partially achieved through the engagement of the cerebello-cortical functional connectivity. Copyright © 2018 Elsevier Inc. All rights reserved.
Planning ATES systems under uncertainty
NASA Astrophysics Data System (ADS)
Jaxa-Rozen, Marc; Kwakkel, Jan; Bloemendal, Martin
2015-04-01
Aquifer Thermal Energy Storage (ATES) can contribute to significant reductions in energy use within the built environment, by providing seasonal energy storage in aquifers for the heating and cooling of buildings. ATES systems have experienced a rapid uptake over the last two decades; however, despite successful experiments at the individual level, the overall performance of ATES systems remains below expectations - largely due to suboptimal practices for the planning and operation of systems in urban areas. The interaction between ATES systems and underground aquifers can be interpreted as a common-pool resource problem, in which thermal imbalances or interference could eventually degrade the storage potential of the subsurface. Current planning approaches for ATES systems thus typically follow the precautionary principle. For instance, the permitting process in the Netherlands is intended to minimize thermal interference between ATES systems. However, as shown in recent studies (Sommer et al., 2015; Bakr et al., 2013), a controlled amount of interference may benefit the collective performance of ATES systems. An overly restrictive approach to permitting is instead likely to create an artificial scarcity of available space, limiting the potential of the technology in urban areas. In response, master plans - which take into account the collective arrangement of multiple systems - have emerged as an increasingly popular alternative. However, permits and master plans both take a static, ex ante view of ATES governance, making it difficult to predict the effect of evolving ATES use or climactic conditions on overall performance. In particular, the adoption of new systems by building operators is likely to be driven by the available subsurface space and by the performance of existing systems; these outcomes are themselves a function of planning parameters. From this perspective, the interactions between planning authorities, ATES operators, and subsurface conditions form a complex adaptive system, for which agent-based modelling provides a useful analysis framework. This study therefore explores the interactions between endogenous ATES adoption processes and the relative performance of different planning schemes, using an agent-based adoption model coupled with a hydrologic model of the subsurface. The models are parameterized to simulate typical operating conditions for ATES systems in a dense urban area. Furthermore, uncertainties relating to planning parameters, adoption processes, and climactic conditions are explicitly considered using exploratory modelling techniques. Results are therefore presented for the performance of different planning policies over a broad range of plausible scenarios.
Olavarría, Verónica V; Arima, Hisatomi; Anderson, Craig S; Brunser, Alejandro; Muñoz-Venturelli, Paula; Billot, Laurent; Lavados, Pablo M
2017-02-01
Background The HEADPOST Pilot is a proof-of-concept, open, prospective, multicenter, international, cluster randomized, phase IIb controlled trial, with masked outcome assessment. The trial will test if lying flat head position initiated in patients within 12 h of onset of acute ischemic stroke involving the anterior circulation increases cerebral blood flow in the middle cerebral arteries, as measured by transcranial Doppler. The study will also assess the safety and feasibility of patients lying flat for ≥24 h. The trial was conducted in centers in three countries, with ability to perform early transcranial Doppler. A feature of this trial was that patients were randomized to a certain position according to the month of admission to hospital. Objective To outline in detail the predetermined statistical analysis plan for HEADPOST Pilot study. Methods All data collected by participating researchers will be reviewed and formally assessed. Information pertaining to the baseline characteristics of patients, their process of care, and the delivery of treatments will be classified, and for each item, appropriate descriptive statistical analyses are planned with comparisons made between randomized groups. For the outcomes, statistical comparisons to be made between groups are planned and described. Results This statistical analysis plan was developed for the analysis of the results of the HEADPOST Pilot study to be transparent, available, verifiable, and predetermined before data lock. Conclusions We have developed a statistical analysis plan for the HEADPOST Pilot study which is to be followed to avoid analysis bias arising from prior knowledge of the study findings. Trial registration The study is registered under HEADPOST-Pilot, ClinicalTrials.gov Identifier NCT01706094.
Data Validation Package - July 2016 Groundwater Sampling at the Gunnison, Colorado, Disposal Site
DOE Office of Scientific and Technical Information (OSTI.GOV)
Linard, Joshua; Campbell, Sam
Groundwater sampling at the Gunnison, Colorado, Disposal Site is conducted every 5 years to monitor disposal cell performance. During this event, samples were collected from eight monitoring wells as specified in the 1997 Long-Term Surveillance Plan for the Gunnison, Colorado, Disposal Site. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for US Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and analysis-plan-us-department-energy-office-legacy-management-sites). Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. A duplicate sample was collected from location 0723. Water levels were measured at all monitoring wells thatmore » were sampled and seven additional wells. The analytical data and associated qualifiers can be viewed in environmental database reports and are also available for viewing with dynamic mapping via the GEMS (Geospatial Environmental Mapping System) website at http://gems.lm.doe.gov/#. No issues were identified during the data validation process that require additional action or follow-up.« less
NASA Astrophysics Data System (ADS)
Preiss, Bruce; Greene, Lloyd; Kriebel, Jamie; Wasson, Robert
2006-05-01
The Air Force Research Laboratory utilizes a value model as a primary input for space technology planning and budgeting. The Space Sector at AFRL headquarters manages space technology investment across all the geographically disparate technical directorates and ensures that integrated planning is achieved across the space community. The space investment portfolio must ultimately balance near, mid, and far-term investments across all the critical space mission areas. Investment levels and growth areas can always be identified by a typical capability analysis or gap analysis, but the value model approach goes one step deeper and helps identify the potential payoff of technology investments by linking the technology directly to an existing or potential concept. The value of the technology is then viewed from the enabling performance perspective of the concept that ultimately fulfills the Air Force mission. The process of linking space technologies to future concepts and technology roadmaps will be reviewed in this paper, along with representative results from this planning cycle. The initial assumptions in this process will be identified along with the strengths and weaknesses of this planning methodology.
ACHP | Stragetic Sustainability Performance Plans
Sustainability Performance Plan (SSPP). Click here to access these plans. The ACHP's SSPP addresses how the Strategic Sustainability Performance Plan 2012 (PDF) ACHP Strategic Sustainability Performance Plan 2011 (PDF) ACHP Strategic Sustainability Performance Plan 2010 (PDF) Updated August 5, 2013 Return to Top
2008 U.S. Coast Guard Innovation Expo
2008-11-20
for Capability (CG-7) Public Release Authorized DCO Outcomes • Mission Performance Plans, policies, strategic analysis and planning, assessments and...Untitled Document 2008 U.S.htm[5/26/ 2016 2:24:38 PM] 2008 U.S. Coast Guard Innovation Expo “Collaboration Fuels Innovation” Virginia Beach, Virginia...Untitled Document 2008 U.S.htm[5/26/ 2016 2:24:38 PM] Panelists: Mr. Tom Tomaiko, Maritime Security Program Manager, Borders and Maritime Security
1981-02-01
108 NED Project Plan........................................ 108 EQ Project Plan ......................................... 115 Performance of Water...Conservation Proposal: ED Objective ............. 115 50. Atlanta ED Water Conservation Proposal: EQasObjective............. 115 52. Atlanta EQ Water... differential inflation of energy prices, this would provide an annualized energy-related advantageous effect of $655,000/year. Measure A2--Moderate Kit
Joint Forward Area Air Defense Test Program Definition.
1984-03-30
Visibility Conditions 23 CHAPTER 6. ACRONYMS LIST 24 . CHAPTER 7. REFERENCE 26 APPENDIX A. IDENTIFICATION ISSUE ANALAYSIS PLAN A-1 to A-17 B. C3...and kill ratios between single and multiple pass aircraft. A " multivariate analysis" will be performed to determine if there is any significant...killed will be compared for each set of identification procedure". A " multivariate analysis" will be performed on the number of hostile and friendly
Putting the Pieces Together: Leadership for Change in Low-Performing Urban Schools
ERIC Educational Resources Information Center
Orr, Margaret Terry; Berg, Barbara; Shore, Rima; Meier, Ellen
2008-01-01
This article presents a collaborative inquiry analysis of the school improvement experiences of four persistently low-performing schools. It draws on the experiences of three members of the Laboratory for the Design and Redesign of Schools (LDRS) consortium who helped during their planning for restructuring or restructuring phases and one regional…
NASA Technical Reports Server (NTRS)
Wojciechowski, C. J.; Kurzius, S. C.; Doktor, M. F.
1984-01-01
The design of a subscale jet engine driven ejector/diffuser system is examined. Analytical results and preliminary design drawings and plans are included. Previously developed performance prediction techniques are verified. A safety analysis is performed to determine the mechanism for detonation suppression.
Numerical study on interaction of local air cooler with stratified hydrogen cloud in a large vessel
DOE Office of Scientific and Technical Information (OSTI.GOV)
Liang, Z.; Andreani, M.
2012-07-01
Within the framework of the ERCOSAM project, planning calculations are performed to examine sensitivity parameters that can affect the break-up (erosion) of a helium layer by mitigation devices (i.e., cooler, spray, or Passive Autocatalytic Recombiner - PAR). This paper reports the GOTHIC analysis results for the cooler tests to be performed in the PANDA facility. The cooler elevation and geometry, helium layer thickness, steam distribution in the vessel, and the vessel geometry (inter-connected multi-compartments versus a single volume) on the erosion process as well as the cooling capacity are studied. This analysis is valuable because only a limited number ofmore » conditions will be examined in the planned experiments. The study provides a useful understanding of the interaction of a cooler with a stratified atmosphere. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ma, T; Kumaraswamy, L
Purpose: Detection of treatment delivery errors is important in radiation therapy. However, accurate quantification of delivery errors is also of great importance. This study aims to evaluate the 3DVH software’s ability to accurately quantify delivery errors. Methods: Three VMAT plans (prostate, H&N and brain) were randomly chosen for this study. First, we evaluated whether delivery errors could be detected by gamma evaluation. Conventional per-beam IMRT QA was performed with the ArcCHECK diode detector for the original plans and for the following modified plans: (1) induced dose difference error up to ±4.0% and (2) control point (CP) deletion (3 to 10more » CPs were deleted) (3) gantry angle shift error (3 degree uniformly shift). 2D and 3D gamma evaluation were performed for all plans through SNC Patient and 3DVH, respectively. Subsequently, we investigated the accuracy of 3DVH analysis for all cases. This part evaluated, using the Eclipse TPS plans as standard, whether 3DVH accurately can model the changes in clinically relevant metrics caused by the delivery errors. Results: 2D evaluation seemed to be more sensitive to delivery errors. The average differences between ECLIPSE predicted and 3DVH results for each pair of specific DVH constraints were within 2% for all three types of error-induced treatment plans, illustrating the fact that 3DVH is fairly accurate in quantifying the delivery errors. Another interesting observation was that even though the gamma pass rates for the error plans are high, the DVHs showed significant differences between original plan and error-induced plans in both Eclipse and 3DVH analysis. Conclusion: The 3DVH software is shown to accurately quantify the error in delivered dose based on clinically relevant DVH metrics, where a conventional gamma based pre-treatment QA might not necessarily detect.« less
2006-04-14
combination of the Strategic Plan, MPPs, and BPPs goals, along with performance, and accountability plans. Three other documents are inherently important...DOS Strategic Plan, Mission Performance Plan (MPP), Bureau Performance Plan ( BPP ). NSC representation, POLADs, Embassy Country Teams, and...the world. DOS Strategic Plan, Mission Performance Plan (MPP), Bureau Performance Plan ( BPP ). NSC representation, POLADs, Exchange
NASA Technical Reports Server (NTRS)
Hawthorne, E. I.
1977-01-01
Several thrust system design concepts were evaluated and compared using the specifications of the most advanced 30 cm engineering model thruster as the technology base. Emphasis was placed on relatively high power missions. The extensions in thruster performance required for the Halley's comet mission were defined and alternative thrust system concepts were designed in sufficient detail for comparing mass, efficiency, reliability, structure, and thermal characteristics. Confirmation testing and analysis of thruster and power-processing components were performed. A baseline design was selected from the alternatives considered, and the design analysis and documentation were refined. A program development plan was formulated that outlines the work structure considered necessary for developing, qualifying, and fabricating the flight hardware for the baseline thrust system within the time frame of a project to rendezvous with Halley's comet. An assessment was made of the costs and risks associated with a baseline thrust system as provided to the mission project under this plan. Critical procurements and interfaces were identified and defined.
Simulation of Thematic Mapper performance as a function of sensor scanning parameters
NASA Technical Reports Server (NTRS)
Johnson, R. H.; Shah, N. J.; Schmidt, N. F.
1975-01-01
The investigation and results of the Thematic Mapper Instrument Performance Study are described. The Thematic Mapper is the advanced multispectral scanner initially planned for the Earth Observation Satellite and now planned for LANDSAT D. The use of existing digital airborne scanner data obtained with the Modular Multispectral Scanner (M2S) at Bendix provided an opportunity to simulate the effects of variation of design parameters of the Thematic Mapper. Analysis and processing of this data on the Bendix Multispectral Data Analysis System were used to empirically determine categorization performance on data generated with variations of the sampling period and scan overlap parameters of the Thematic Mapper. The Bendix M2S data, with a 2.5 milliradian instantaneous field of view and a spatial resolution (pixel size) of 10-m from 13,000 ft altitude, allowed a direct simulation of Thematic Mapper data with a 30-m resolution. The flight data chosen were obtained on 30 June 1973 over agricultural test sites in Indiana.
Study of the IMRT interplay effect using a 4DCT Monte Carlo dose calculation.
Jensen, Michael D; Abdellatif, Ady; Chen, Jeff; Wong, Eugene
2012-04-21
Respiratory motion may lead to dose errors when treating thoracic and abdominal tumours with radiotherapy. The interplay between complex multileaf collimator patterns and patient respiratory motion could result in unintuitive dose changes. We have developed a treatment reconstruction simulation computer code that accounts for interplay effects by combining multileaf collimator controller log files, respiratory trace log files, 4DCT images and a Monte Carlo dose calculator. Two three-dimensional (3D) IMRT step-and-shoot plans, a concave target and integrated boost were delivered to a 1D rigid motion phantom. Three sets of experiments were performed with 100%, 50% and 25% duty cycle gating. The log files were collected, and five simulation types were performed on each data set: continuous isocentre shift, discrete isocentre shift, 4DCT, 4DCT delivery average and 4DCT plan average. Analysis was performed using 3D gamma analysis with passing criteria of 2%, 2 mm. The simulation framework was able to demonstrate that a single fraction of the integrated boost plan was more sensitive to interplay effects than the concave target. Gating was shown to reduce the interplay effects. We have developed a 4DCT Monte Carlo simulation method that accounts for IMRT interplay effects with respiratory motion by utilizing delivery log files.
Schneider, Adrian K; Pierrepont, Jim W; Hawdon, Gabrielle; McMahon, Stephen
2018-04-01
Patient specific guides can be a valuable tool in improving the precision of planned femoral neck osteotomies, especially in minimally invasive hip surgery, where bony landmarks are often inaccessible. The aim of our study was to validate the accuracy of a novel patient specific femoral osteotomy guide for THR through a minimally invasive posterior approach, the direct superior approach (DSA). As part of our routine preoperative planning 30 patients underwent low dose CT scans of their arthritic hip. 3D printed patient specific femoral neck osteotomy guides were then produced. Intraoperatively, having cleared all soft tissue from the postero-lateral neck of the enlocated hip, the guide was placed and pinned onto the posterolateral femoral neck. The osteotomy was performed using an oscillating saw and the uncemented hip components were implanted as per routine. Postoperatively, the achieved level of the osteotomy at the medial calcar was compared with the planned level of resection using a 3D/2D matching analysis (Mimics X-ray module, Materialise, Belgium). A total of 30 patients undergoing uncemented Trinity™ acetabular and TriFit TS™ femoral component arthroplasty (Corin, UK) were included in our analysis. All but one of our analysed osteotomies were found to be within 3 mm from the planned height of osteotomy. In one patient the level of osteotomy deviated 5 mm below the planned level of resection. Preoperative planning and the use of patient specific osteotomy guides provides an accurate method of performing femoral neck osteotomies in minimally invasive hip arthroplasty using the direct superior approach. IV (Case series).
Labrecque, M.; Bédard, L.; Laperrière, L.
1998-01-01
OBJECTIVE: To compare the efficacy of, and complications associated with, vasectomies performed in two medical clinics. DESIGN: Retrospective cohort study. SETTING: A private medical clinic and a family planning clinic at a teaching hospital in the Quebec City region, where one doctor performs all surgery. PARTICIPANTS: The 1223 men who underwent a first vasectomy between January 1994 and February 1996. INTERVENTIONS: Isolations of the vas deferens through the scrotum was performed using the no-scalpel technique in both clinics. At the private clinic (n = 775), vasectomy was performed by ligature with tantalum clips. At the family planning clinic (n = 448), a combination of cauterisation of the abdominal end of the vas deferens, leaving the testicular end open, and fascial interposition with a clip was used. MAIN OUTCOME MEASURES: Rate of postoperative complications (painful granuloma; noninfectious inflammation of the vas deferens, epididymis, and testes; hematoma; infection; undiagnosed pain) and rate of recanalization (early and late). RESULTS: At the private clinic, 39 patients (5.0%) consulted for postoperative complications, compared with 55 patients (12.3%) at the family planning clinic (chi (2)1 = 21.0; P < 0.001). Of the patients who underwent semen analysis, 15 (2.8%) at the private clinic and 4 (1.2%) at the family planning clinic experienced early or late recanalization (chi (2)1 = 2.2; P < .14). CONCLUSION: The rate of consultation for postoperative complications was lower at the private clinic than at the family planning clinic, but the efficacy of the procedure appeared to be higher at the family planning clinic. The surgical techniques used at the two clinics might partially explain these differences. PMID:9789666
Evaluation of a commercial automatic treatment planning system for prostate cancers.
Nawa, Kanabu; Haga, Akihiro; Nomoto, Akihiro; Sarmiento, Raniel A; Shiraishi, Kenshiro; Yamashita, Hideomi; Nakagawa, Keiichi
2017-01-01
Recent developments in Radiation Oncology treatment planning have led to the development of software packages that facilitate automated intensity-modulated radiation therapy (IMRT) and volumetric-modulated arc therapy (VMAT) planning. Such solutions include site-specific modules, plan library methods, and algorithm-based methods. In this study, the plan quality for prostate cancer generated by the Auto-Planning module of the Pinnacle 3 radiation therapy treatment planning system (v9.10, Fitchburg, WI) is retrospectively evaluated. The Auto-Planning module of Pinnacle 3 uses a progressive optimization algorithm. Twenty-three prostate cancer cases, which had previously been planned and treated without lymph node irradiation, were replanned using the Auto-Planning module. Dose distributions were statistically compared with those of manual planning by the paired t-test at 5% significance level. Auto-Planning was performed without any manual intervention. Planning target volume (PTV) dose and dose to rectum were comparable between Auto-Planning and manual planning. The former, however, significantly reduced the dose to the bladder and femurs. Regression analysis was performed to examine the correlation between volume overlap between bladder and PTV divided by the total bladder volume and resultant V70. The findings showed that manual planning typically exhibits a logistic way for dose constraint, whereas Auto-Planning shows a more linear tendency. By calculating the Akaike information criterion (AIC) to validate the statistical model, a reduction of interoperator variation in Auto-Planning was shown. We showed that, for prostate cancer, the Auto-Planning module provided plans that are better than or comparable with those of manual planning. By comparing our results with those previously reported for head and neck cancer treatment, we recommend the homogeneous plan quality generated by the Auto-Planning module, which exhibits less dependence on anatomic complexity. Copyright © 2017 American Association of Medical Dosimetrists. Published by Elsevier Inc. All rights reserved.
NASA Astrophysics Data System (ADS)
Yeo, U. J.; Taylor, M. L.; Kron, T.; Pham, D.; Siva, S.; Franich, R. D.
2013-06-01
Respiratory motion induces dosimetric uncertainties for thoracic and abdominal cancer radiotherapy (RT) due to deforming and moving anatomy. This study investigates the extent of dosimetric differences between conventional 3D treatment planning and path-integrated 4D treatment planning in liver stereotactic body radiotherapy (SBRT). Respiratory-correlated 4DCT image sets with 10 phases were acquired for patients with liver tumours. Path-integrated 4D dose accumulation was performed using dose-warping techniques based on deformable image registration. Dose-volume histogram analysis demonstrated that the 3D planning approach overestimated doses to targets by up to 24% and underestimated dose to normal liver by ~4.5%, compared to the 4D planning methodology. Therefore, 4D planning has the potential to quantify such issues of under- and/or over-dosage and improve treatment accuracy.
Planning Coverage Campaigns for Mission Design and Analysis: CLASP for DESDynl
NASA Technical Reports Server (NTRS)
Knight, Russell L.; McLaren, David A.; Hu, Steven
2013-01-01
Mission design and analysis presents challenges in that almost all variables are in constant flux, yet the goal is to achieve an acceptable level of performance against a concept of operations, which might also be in flux. To increase responsiveness, automated planning tools are used that allow for the continual modification of spacecraft, ground system, staffing, and concept of operations, while returning metrics that are important to mission evaluation, such as area covered, peak memory usage, and peak data throughput. This approach was applied to the DESDynl mission design using the CLASP planning system, but since this adaptation, many techniques have changed under the hood for CLASP, and the DESDynl mission concept has undergone drastic changes. The software produces mission evaluation products, such as memory highwater marks, coverage percentages, given a mission design in the form of coverage targets, concept of operations, spacecraft parameters, and orbital parameters. It tries to overcome the lack of fidelity and timeliness of mission requirements coverage analysis during mission design. Previous techniques primarily use Excel in ad hoc fashion to approximate key factors in mission performance, often falling victim to overgeneralizations necessary in such an adaptation. The new program allows designers to faithfully represent their mission designs quickly, and get more accurate results just as quickly.
CFD in the context of IHPTET - The Integrated High Performance Turbine Engine Technology Program
NASA Technical Reports Server (NTRS)
Simoneau, Robert J.; Hudson, Dale A.
1989-01-01
The Integrated High Performance Turbine Engine Technology (IHPTET) Program is an integrated DOD/NASA technology program designed to double the performance capability of today's most advanced military turbine engines as we enter the twenty-first century. Computational Fluid Dynamics (CFD) is expected to play an important role in the design/analysis of specific configurations within this complex machine. In order to do this, a plan is being developed to ensure the timely impact of CFD on IHPTET. The developing philosophy of CFD in the context of IHPTET is discussed. The key elements in the developing plan and specific examples of state-of-the-art CFD efforts which are IHPTET turbine engine relevant are discussed.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-13
... Massachusetts Department of Environmental Protection performed a missing data analysis for each site with low... Massachusetts missing data analysis used a combination of meteorology and air quality data for ozone monitors... with missing ozone data, the ozone levels, if captured, would have been below the 1997 8-hour ozone...
Behzadian, Kourosh; Kapelan, Zoran
2015-09-15
Despite providing water-related services as the primary purpose of urban water system (UWS), all relevant activities require capital investments and operational expenditures, consume resources (e.g. materials and chemicals), and may increase negative environmental impacts (e.g. contaminant discharge, emissions to water and air). Performance assessment of such a metabolic system may require developing a holistic approach which encompasses various system elements and criteria. This paper analyses the impact of integration of UWS components on the metabolism based performance assessment for future planning using a number of intervention strategies. It also explores the importance of sustainability based criteria in the assessment of long-term planning. Two assessment approaches analysed here are: (1) planning for only water supply system (WSS) as a part of the UWS and (2) planning for an integrated UWS including potable water, stormwater, wastewater and water recycling. WaterMet(2) model is used to simulate metabolic type processes in the UWS and calculate quantitative performance indicators. The analysis is demonstrated on the problem of strategic level planning of a real-world UWS to where optional intervention strategies are applied. The resulting performance is assessed using the multiple criteria of both conventional and sustainability type; and optional intervention strategies are then ranked using the Compromise Programming method. The results obtained show that the high ranked intervention strategies in the integrated UWS are those supporting both water supply and stormwater/wastewater subsystems (e.g. rainwater harvesting and greywater recycling schemes) whilst these strategies are ranked low in the WSS and those targeting improvement of water supply components only (e.g. rehabilitation of clean water pipes and addition of new water resources) are preferred instead. Results also demonstrate that both conventional and sustainability type performance indicators are necessary for strategic planning in the UWS. Copyright © 2015 Elsevier B.V. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moriya, S; National Cancer Center, Kashiwa, Chiba; Tachibana, H
Purpose: Daily CT-based three-dimensional image-guided and adaptive (CTIGRT-ART) proton therapy system was designed and developed. We also evaluated the effectiveness of the CTIGRT-ART. Methods: Retrospective analysis was performed in three lung cancer patients: Proton treatment planning was performed using CT image datasets acquired by Toshiba Aquilion ONE. Planning target volume and surrounding organs were contoured by a well-trained radiation oncologist. Dose distribution was optimized using 180-deg. and 270-deg. two fields in passive scattering proton therapy. Well commissioned Simplified Monte Carlo algorithm was used as dose calculation engine. Daily consecutive CT image datasets was acquired by an in-room CT (Toshiba Aquilionmore » LB). In our in-house program, two image registrations for bone and tumor were performed to shift the isocenter using treatment CT image dataset. Subsequently, dose recalculation was performed after the shift of the isocenter. When the dose distribution after the tumor registration exhibits change of dosimetric parameter of CTV D90% compared to the initial plan, an additional process of was performed that the range shifter thickness was optimized. Dose distribution with CTV D90% for the bone registration, the tumor registration only and adaptive plan with the tumor registration was compared to the initial plan. Results: In the bone registration, tumor dose coverage was decreased by 16% on average (Maximum: 56%). The tumor registration shows better coverage than the bone registration, however the coverage was also decreased by 9% (Maximum: 22%) The adaptive plan shows similar dose coverage of the tumor (Average: 2%, Maximum: 7%). Conclusion: There is a high possibility that only image registration for bone and tumor may reduce tumor coverage. Thus, our proposed methodology of image guidance and adaptive planning using the range adaptation after tumor registration would be effective for proton therapy. This research is partially supported by Japan Agency for Medical Research and Development (AMED).« less
Independent Monte-Carlo dose calculation for MLC based CyberKnife radiotherapy
NASA Astrophysics Data System (ADS)
Mackeprang, P.-H.; Vuong, D.; Volken, W.; Henzen, D.; Schmidhalter, D.; Malthaner, M.; Mueller, S.; Frei, D.; Stampanoni, M. F. M.; Dal Pra, A.; Aebersold, D. M.; Fix, M. K.; Manser, P.
2018-01-01
This work aims to develop, implement and validate a Monte Carlo (MC)-based independent dose calculation (IDC) framework to perform patient-specific quality assurance (QA) for multi-leaf collimator (MLC)-based CyberKnife® (Accuray Inc., Sunnyvale, CA) treatment plans. The IDC framework uses an XML-format treatment plan as exported from the treatment planning system (TPS) and DICOM format patient CT data, an MC beam model using phase spaces, CyberKnife MLC beam modifier transport using the EGS++ class library, a beam sampling and coordinate transformation engine and dose scoring using DOSXYZnrc. The framework is validated against dose profiles and depth dose curves of single beams with varying field sizes in a water tank in units of cGy/Monitor Unit and against a 2D dose distribution of a full prostate treatment plan measured with Gafchromic EBT3 (Ashland Advanced Materials, Bridgewater, NJ) film in a homogeneous water-equivalent slab phantom. The film measurement is compared to IDC results by gamma analysis using 2% (global)/2 mm criteria. Further, the dose distribution of the clinical treatment plan in the patient CT is compared to TPS calculation by gamma analysis using the same criteria. Dose profiles from IDC calculation in a homogeneous water phantom agree within 2.3% of the global max dose or 1 mm distance to agreement to measurements for all except the smallest field size. Comparing the film measurement to calculated dose, 99.9% of all voxels pass gamma analysis, comparing dose calculated by the IDC framework to TPS calculated dose for the clinical prostate plan shows 99.0% passing rate. IDC calculated dose is found to be up to 5.6% lower than dose calculated by the TPS in this case near metal fiducial markers. An MC-based modular IDC framework was successfully developed, implemented and validated against measurements and is now available to perform patient-specific QA by IDC.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Owen, D; Anderson, C; Mayo, C
Purpose: To extend the functionality of a commercial treatment planning system (TPS) to support (i) direct use of quantitative image-based metrics within treatment plan optimization and (ii) evaluation of dose-functional volume relationships to assist in functional image adaptive radiotherapy. Methods: A script was written that interfaces with a commercial TPS via an Application Programming Interface (API). The script executes a program that performs dose-functional volume analyses. Written in C#, the script reads the dose grid and correlates it with image data on a voxel-by-voxel basis through API extensions that can access registration transforms. A user interface was designed through WinFormsmore » to input parameters and display results. To test the performance of this program, image- and dose-based metrics computed from perfusion SPECT images aligned to the treatment planning CT were generated, validated, and compared. Results: The integration of image analysis information was successfully implemented as a plug-in to a commercial TPS. Perfusion SPECT images were used to validate the calculation and display of image-based metrics as well as dose-intensity metrics and histograms for defined structures on the treatment planning CT. Various biological dose correction models, custom image-based metrics, dose-intensity computations, and dose-intensity histograms were applied to analyze the image-dose profile. Conclusion: It is possible to add image analysis features to commercial TPSs through custom scripting applications. A tool was developed to enable the evaluation of image-intensity-based metrics in the context of functional targeting and avoidance. In addition to providing dose-intensity metrics and histograms that can be easily extracted from a plan database and correlated with outcomes, the system can also be extended to a plug-in optimization system, which can directly use the computed metrics for optimization of post-treatment tumor or normal tissue response models. Supported by NIH - P01 - CA059827.« less
77 FR 70875 - Department of State Performance Review Board Members
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-27
...-Greenfield, Director General of the Foreign Service and Director of Human Resources, Department of State. [FR..., Department of State; Kevin P. O'Keefe, Director, Office of Plans, Policy, and Analysis, Bureau of Political...
Quantitative evaluation of patient-specific quality assurance using online dosimetry system
NASA Astrophysics Data System (ADS)
Jung, Jae-Yong; Shin, Young-Ju; Sohn, Seung-Chang; Min, Jung-Whan; Kim, Yon-Lae; Kim, Dong-Su; Choe, Bo-Young; Suh, Tae-Suk
2018-01-01
In this study, we investigated the clinical performance of an online dosimetry system (Mobius FX system, MFX) by 1) dosimetric plan verification using gamma passing rates and dose volume metrics and 2) error-detection capability evaluation by deliberately introduced machine error. Eighteen volumetric modulated arc therapy (VMAT) plans were studied. To evaluate the clinical performance of the MFX, we used gamma analysis and dose volume histogram (DVH) analysis. In addition, to evaluate the error-detection capability, we used gamma analysis and DVH analysis utilizing three types of deliberately introduced errors (Type 1: gantry angle-independent multi-leaf collimator (MLC) error, Type 2: gantry angle-dependent MLC error, and Type 3: gantry angle error). A dosimetric verification comparison of physical dosimetry system (Delt4PT) and online dosimetry system (MFX), gamma passing rates of the two dosimetry systems showed very good agreement with treatment planning system (TPS) calculation. For the average dose difference between the TPS calculation and the MFX measurement, most of the dose metrics showed good agreement within a tolerance of 3%. For the error-detection comparison of Delta4PT and MFX, the gamma passing rates of the two dosimetry systems did not meet the 90% acceptance criterion with the magnitude of error exceeding 2 mm and 1.5 ◦, respectively, for error plans of Types 1, 2, and 3. For delivery with all error types, the average dose difference of PTV due to error magnitude showed good agreement between calculated TPS and measured MFX within 1%. Overall, the results of the online dosimetry system showed very good agreement with those of the physical dosimetry system. Our results suggest that a log file-based online dosimetry system is a very suitable verification tool for accurate and efficient clinical routines for patient-specific quality assurance (QA).
Jang, Si Young; Lalonde, Ron; Ozhasoglu, Cihat; Burton, Steven; Heron, Dwight; Huq, M Saiful
2016-09-08
We performed an evaluation of the CyberKnife InCise MLC by comparing plan qualities for single and multiple brain lesions generated using the first version of InCise MLC, fixed cone, and Iris collimators. We also investigated differences in delivery efficiency among the three collimators. Twenty-four patients with single or multiple brain mets treated previously in our clinic on a CyberKnife M6 using cone/Iris collimators were selected for this study. Treatment plans were generated for all lesions using the InCise MLC. Number of monitor units, delivery time, target coverage, conformity index, and dose falloff were compared between MLC- and clinical cone/Iris-based plans. Statistical analysis was performed using the non-parametric Wilcoxon-Mann-Whitney signed-rank test. The planning accuracy of the MLC-based plans was validated using chamber and film measurements. The InCise MLC-based plans achieved mean dose and target coverage comparable to the cone/Iris-based plans. Although the conformity indices of the MLC-based plans were slightly higher than those of the cone/Iris-based plans, beam delivery time for the MLC-based plans was shorter by 30% ~ 40%. For smaller targets or cases with OARs located close to or abutting target volumes, MLC-based plans provided inferior dose conformity compared to cone/Iris-based plans. The QA results of MLC-based plans were within 5% absolute dose difference with over 90% gamma passing rate using 2%/2 mm gamma criteria. The first version of InCise MLC could be a useful delivery modality, especially for clinical situations for which delivery time is a limiting factor or for multitarget cases. © 2016 The Authors.
Comparison of dose accuracy between 2D array detectors and Epid for IMRT of nasopharynx cancer
NASA Astrophysics Data System (ADS)
Altiparmak, Duygu; Coban, Yasin; Merih, Adil; Avci, Gulhan Guler; Yigitoglu, Ibrahim
2017-02-01
The aim of this study is to perform the dosimetric controls of nasopharynx cancer patient's intensity modulated radiation therapy (IMRT) treatment plans that generated by treatment planing system (TPS) with using two different equipments and also to make comparison in terms of their reliability and practicability. This study has been performed at Radiation Oncology Department, Medicine Faculty in Gaziosmanpasa University by using the VARIAN CLINAC DHX linear accelerator which is operated in the range of 6 MV. Selected 10 nasopharynx patients planned in TPS (Eclipce V13.0) and approved for treatment by medical physicists and radiation oncologists. These plans recalculated on EPID and mapcheck which are 2D dosimetric equipments to obtain dose maps. To compare these two dosimetric equipments gamma analysis method has been preferred. Achieved data is presented and discussed.
A business man views commercial ventures in space.
NASA Technical Reports Server (NTRS)
Scarff, D. D.; Bloom, H. L.
1973-01-01
Paper reviews technical, resource planning and marketing steps an industrial organization must perform in arriving at a decision to undertake space development and production of commercial products or services for Users on the ground. Technical elements are supported by particular examples. Analysis of required resources emphasizes facility and financial inter-relationships between commercial organizations and NASA. Marketing planning covers elements of profitability. Paper addresses questions related to protection of corporate stockholders and public interest, investment decision timing, budget variations. Paper concludes with observations on timeliness of planning shuttle-based commercial ventures and on key industry/NASA problems and decisions.
Generation of an activation map for decommissioning planning of the Berlin Experimental Reactor-II
NASA Astrophysics Data System (ADS)
Lapins, Janis; Guilliard, Nicole; Bernnat, Wolfgang
2017-09-01
The BER-II is an experimental facility with 10 MW that was operated since 1974. Its planned operation will end in 2019. To support the decommissioning planning, a map with the overall distribution of relevant radionuclides has to be created according to the state of the art. In this paper, a procedure to create these 3-d maps using a combination of MCNP and deterministic methods is presented. With this approach, an activation analysis is performed for the whole reactor geometry including the most remote parts of the concrete shielding.
Quantifying the process and outcomes of person-centered planning.
Holburn, S; Jacobson, J W; Vietze, P M; Schwartz, A A; Sersen, E
2000-09-01
Although person-centered planning is a popular approach in the field of developmental disabilities, there has been little systematic assessment of its process and outcomes. To measure person-centered planning, we developed three instruments designed to assess its various aspects. We then constructed variables comprising both a Process and an Outcome Index using a combined rational-empirical method. Test-retest reliability and measures of internal consistency appeared adequate. Variable correlations and factor analysis were generally consistent with our conceptualization and resulting item and variable classifications. Practical implications for intervention integrity, program evaluation, and organizational performance are discussed.
SU-F-T-266: Dynalogs Based Evaluation of Different Dose Rate IMRT Using DVH and Gamma Index
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ahmed, S; Ahmed, S; Ahmed, F
2016-06-15
Purpose: This work investigates the impact of low and high dose rate on IMRT through Dynalogs by evaluating Gamma Index and Dose Volume Histogram. Methods: The Eclipse™ treatment planning software was used to generate plans on prostate and head and neck sites. A range of dose rates 300 MU/min and 600 MU/min were applied to each plan in order to investigate their effect on the beam ON time, efficiency and accuracy. Each plan had distinct monitor units per fraction, delivery time, mean dose rate and leaf speed. The DVH data was used in the assessment of the conformity and planmore » quality.The treatments were delivered on Varian™ Clinac 2100C accelerator equipped with 120 leaf millennium MLC. Dynalogs of each plan were analyzed by MATLAB™ program. Fluence measurements were performed using the Sun Nuclear™ 2D diode array and results were assessed, based on Gamma analysis of dose fluence maps, beam delivery statistics and Dynalogs data. Results: Minor differences found by adjusted R-squared analysis of DVH’s for all the plans with different dose rates. It has been also found that more and larger fields have greater time reduction at high dose rate and there was a sharp decrease in number of control points observed in dynalog files by switching dose rate from 300 MU/min to 600 MU/min. Gamma Analysis of all plans passes the confidence limit of ≥95% with greater number of passing points in 300 MU/min dose rate plans. Conclusion: The dynalog files are compatible tool for software based IMRT QA. It can work perfectly parallel to measurement based QA setup and stand-by procedure for pre and post delivery of treatment plan.« less
Survey Analysis of Military Parishes: The Wright-Patterson AFB Catholic Parish Example.
1980-08-01
had scores which varied from mass to mass--sense of prayerfulness, singing, sense of community, and performance of guitar group--shown in Table 14. 17...significance is that the 1980 ratings were better than the 1978 ratings for all liturgy planning areas. An overall average liturgy planning score was...calculated for each indi- vidual who rated any of the topics. Those scores indicate generally positive perceptions of the liturgies. Eighty-six
Revel8or: Model Driven Capacity Planning Tool Suite
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhu, Liming; Liu, Yan; Bui, Ngoc B.
2007-05-31
Designing complex multi-tier applications that must meet strict performance requirements is a challenging software engineering problem. Ideally, the application architect could derive accurate performance predictions early in the project life-cycle, leveraging initial application design-level models and a description of the target software and hardware platforms. To this end, we have developed a capacity planning tool suite for component-based applications, called Revel8tor. The tool adheres to the model driven development paradigm and supports benchmarking and performance prediction for J2EE, .Net and Web services platforms. The suite is composed of three different tools: MDAPerf, MDABench and DSLBench. MDAPerf allows annotation of designmore » diagrams and derives performance analysis models. MDABench allows a customized benchmark application to be modeled in the UML 2.0 Testing Profile and automatically generates a deployable application, with measurement automatically conducted. DSLBench allows the same benchmark modeling and generation to be conducted using a simple performance engineering Domain Specific Language (DSL) in Microsoft Visual Studio. DSLBench integrates with Visual Studio and reuses its load testing infrastructure. Together, the tool suite can assist capacity planning across platforms in an automated fashion.« less
Patient participation in discharge planning conference
Bångsbo, Angela; Dunér, Anna; Lidén, Eva
2014-01-01
Introduction There is a need for individualized discharge planning to support frail older persons at hospital discharge. In this context, active participation on their behalf cannot be taken for granted. The aim of this study was to elucidate patient participation in discharge planning conferences, with a focus on frail older persons, supported by the theory of positioning described by Harré & van Langenhove. Methods The study was designed as a case study based on audio-recordings of multidisciplinary discharge planning conferences and interviews with health professionals elucidating their opinions on preconditions for patient participation in discharge planning. The analysis has been performed using qualitative content analysis and discourse analysis. Data collection took place during 2008–2009 and included 40 health professionals and 13 frail older persons in hospital or municipal settings. Results Findings revealed four different positions of participation, characterized by the older person's level of activity during the conference and his/her appearance as being reduced (patient) or whole (person). The positions varied dynamically from being an active person, passive person, active patient, or passive patient and the health professionals, next-of-kin, and the older persons themselves contributed to the positioning. Conclusions The findings showed how the institutional setting served as a purposeful structure or a confinement to patient participation. PMID:25411572
Strategic rehabilitation planning of piped water networks using multi-criteria decision analysis.
Scholten, Lisa; Scheidegger, Andreas; Reichert, Peter; Maurer, Max; Mauer, Max; Lienert, Judit
2014-02-01
To overcome the difficulties of strategic asset management of water distribution networks, a pipe failure and a rehabilitation model are combined to predict the long-term performance of rehabilitation strategies. Bayesian parameter estimation is performed to calibrate the failure and replacement model based on a prior distribution inferred from three large water utilities in Switzerland. Multi-criteria decision analysis (MCDA) and scenario planning build the framework for evaluating 18 strategic rehabilitation alternatives under future uncertainty. Outcomes for three fundamental objectives (low costs, high reliability, and high intergenerational equity) are assessed. Exploitation of stochastic dominance concepts helps to identify twelve non-dominated alternatives and local sensitivity analysis of stakeholder preferences is used to rank them under four scenarios. Strategies with annual replacement of 1.5-2% of the network perform reasonably well under all scenarios. In contrast, the commonly used reactive replacement is not recommendable unless cost is the only relevant objective. Exemplified for a small Swiss water utility, this approach can readily be adapted to support strategic asset management for any utility size and based on objectives and preferences that matter to the respective decision makers. Copyright © 2013 Elsevier Ltd. All rights reserved.
Comprehensive Flood Plain Studies Using Spatial Data Management Techniques.
1978-06-01
Hydrologic Engineer- ing Center computer programs that forecast urban storm water quality and dynamic in- stream water quality response to waste...determination. Water Quality The water quality analysis planned for the pilot study includes urban storm water quality forecasting and in-streamn...analysis is performed under the direction of Tony Thomas. Chief, Research Branch, by Jess Abbott for storm water quality analysis, R. G. Willey for
Failure mode analysis to predict product reliability.
NASA Technical Reports Server (NTRS)
Zemanick, P. P.
1972-01-01
The failure mode analysis (FMA) is described as a design tool to predict and improve product reliability. The objectives of the failure mode analysis are presented as they influence component design, configuration selection, the product test program, the quality assurance plan, and engineering analysis priorities. The detailed mechanics of performing a failure mode analysis are discussed, including one suggested format. Some practical difficulties of implementation are indicated, drawn from experience with preparing FMAs on the nuclear rocket engine program.
Automated and comprehensive link engineering supporting branched, ring, and mesh network topologies
NASA Astrophysics Data System (ADS)
Farina, J.; Khomchenko, D.; Yevseyenko, D.; Meester, J.; Richter, A.
2016-02-01
Link design, while relatively easy in the past, can become quite cumbersome with complex channel plans and equipment configurations. The task of designing optical transport systems and selecting equipment is often performed by an applications or sales engineer using simple tools, such as custom Excel spreadsheets. Eventually, every individual has their own version of the spreadsheet as well as their own methodology for building the network. This approach becomes unmanageable very quickly and leads to mistakes, bending of the engineering rules and installations that do not perform as expected. We demonstrate a comprehensive planning environment, which offers an efficient approach to unify, control and expedite the design process by controlling libraries of equipment and engineering methodologies, automating the process and providing the analysis tools necessary to predict system performance throughout the system and for all channels. In addition to the placement of EDFAs and DCEs, performance analysis metrics are provided at every step of the way. Metrics that can be tracked include power, CD and OSNR, SPM, XPM, FWM and SBS. Automated routine steps assist in design aspects such as equalization, padding and gain setting for EDFAs, the placement of ROADMs and transceivers, and creating regeneration points. DWDM networks consisting of a large number of nodes and repeater huts, interconnected in linear, branched, mesh and ring network topologies, can be designed much faster when compared with conventional design methods. Using flexible templates for all major optical components, our technology-agnostic planning approach supports the constant advances in optical communications.
ERIC Educational Resources Information Center
Mobray, Deborah, Ed.
Papers on local area networks (LANs), modelling techniques, software improvement, capacity planning, software engineering, microcomputers and end user computing, cost accounting and chargeback, configuration and performance management, and benchmarking presented at this conference include: (1) "Theoretical Performance Analysis of Virtual…
Multisite Assessment of Nursing Continuing Education Learning Needs Using an Electronic Tool.
Winslow, Susan; Jackson, Stephanie; Cook, Lesley; Reed, Joanne Williams; Blakeney, Keshia; Zimbro, Kathie; Parker, Cindy
2016-02-01
A continued education needs assessment and associated education plan are required for organizations on the journey for American Nurses Credentialing Center Magnet® designation. Leveraging technology to support the assessment and analysis of continuing education needs was a new venture for a 12-hospital regional health system. The purpose of this performance improvement project was to design and conduct an enhanced process to increase the efficiency and effectiveness of gathering data on nurses' preferences and increase nurse satisfaction with the learner assessment portion of the process. Educators trialed the use of a standardized approach via an electronic survey tool to replace the highly variable processes previously used. Educators were able to view graphical summary of responses by category and setting, which substantially decreased analysis and action planning time for education implementation plans at the system, site, or setting level. Based on these findings, specific continuing education action plans were drafted for each category and classification of nurses. Copyright 2016, SLACK Incorporated.
Oneib, Bouchra; Sabir, Maria; Otheman, Yassine; Abda, Naima; Ouanass, Abderrazzak
2016-01-01
The aim of the study is to estimate the prevalence of suicidal ideation among Moroccan consultants in primary health care system. We conducted a cross sectional survey in three health care centers in two cities of Morocco to estimate the prevalence of suicidal ideation, plan and suicide attempts among 396 consultants in the primary health care system, using the Mini International neuropsychiatric interview. Patients were 18 years and older, without known psychiatric or chronic somatic disease. Statistical analysis was performed by the SPSS 13.0 software. The prevalence of suicidal ideation was 5.3%, and 2.7% of the patients planned their suicide and 1.2% tried to commit suicide. The multivariate analysis did not demonstrate significant association. Suicidal ideation, plan and suicide attempts are prevalent in primary health care patients, but they are still under diagnosed. An adequate training of physicians and the establishment of education programs is essential to reduce the rate of suicide.
Software for Planning Scientific Activities on Mars
NASA Technical Reports Server (NTRS)
Ai-Chang, Mitchell; Bresina, John; Jonsson, Ari; Hsu, Jennifer; Kanefsky, Bob; Morris, Paul; Rajan, Kanna; Yglesias, Jeffrey; Charest, Len; Maldague, Pierre
2003-01-01
Mixed-Initiative Activity Plan Generator (MAPGEN) is a ground-based computer program for planning and scheduling the scientific activities of instrumented exploratory robotic vehicles, within the limitations of available resources onboard the vehicle. MAPGEN is a combination of two prior software systems: (1) an activity-planning program, APGEN, developed at NASA s Jet Propulsion Laboratory and (2) the Europa planner/scheduler from NASA Ames Research Center. MAPGEN performs all of the following functions: Automatic generation of plans and schedules for scientific and engineering activities; Testing of hypotheses (or what-if analyses of various scenarios); Editing of plans; Computation and analysis of resources; and Enforcement and maintenance of constraints, including resolution of temporal and resource conflicts among planned activities. MAPGEN can be used in either of two modes: one in which the planner/scheduler is turned off and only the basic APGEN functionality is utilized, or one in which both component programs are used to obtain the full planning, scheduling, and constraint-maintenance functionality.
ATD-1 Avionics Phase 2: Post-Flight Data Analysis Report
NASA Technical Reports Server (NTRS)
Scharl, Julien
2017-01-01
This report aims to satisfy Air Traffic Management Technology Demonstration - 1 (ATD-1) Statement of Work (SOW) 3.6.19 and serves as the delivery mechanism for the analysis described in Annex C of the Flight Test Plan. The report describes the data collected and derived as well as the analysis methodology and associated results extracted from the data set collected during the ATD-1 Flight Test. All analyses described in the SOW were performed and are covered in this report except for the analysis of Final Approach Speed and its effect on performance. This analysis was de-prioritized and, at the time of this report, is not considered feasible in the schedule and costs remaining.
NASA Technical Reports Server (NTRS)
Wang, Yeou-Fang; Schrock, Mitchell; Baldwin, John R.; Borden, Charles S.
2010-01-01
The Ground Resource Allocation and Planning Environment (GRAPE 1.0) is a Web-based, collaborative team environment based on the Microsoft SharePoint platform, which provides Deep Space Network (DSN) resource planners tools and services for sharing information and performing analysis.
Long-Term Pavement Performance Program
DOT National Transportation Integrated Search
2015-12-01
The LTPP program will yield additional benefits as data are added to the database and as data analysis effortssome currently planned and some yet to be identifiedare completed. Continued monitoring of the test sections that remain in service is...
Los Angeles Downtown People Mover (DPM) Operational Analysis
DOT National Transportation Integrated Search
1981-06-01
Two different studies were performed by the Research and Special Programs Administration of the Transportation Systems Center in response to the concerns of the Urban Mass Transportation Administration about the ability of the planned Los Angeles Dow...
The parameters effect on the structural performance of damaged steel box beam using Taguchi method
NASA Astrophysics Data System (ADS)
El-taly, Boshra A.; Abd El Hameed, Mohamed F.
2018-03-01
In the current study, the influence of notch or opening parameters and the positions of the applied load on the structural performance of steel box beams up to failure was investigated using Finite Element analysis program, ANSYS. The Taguchi-based design of experiments technique was used to plan the current study. The plan included 12 box steel beams; three intact beams, and nine damaged beams (with opening) in the beams web. The numerical studies were conducted under varying the spacing between the two concentrated point loads (location of applied loads), the notch (opening) position, and the ratio between depth and width of the notch with a constant notch area. According to Taguchi analysis, factor X (location of the applied loads) was found the highest contributing parameters for the variation of the ultimate load, vertical deformation, shear stresses, and the compressive normal stresses.
In-Situ Operations and Planning for the Mars Science Laboratory Robotic Arm: The First 200 Sols
NASA Technical Reports Server (NTRS)
Robinson, M.; Collins, C.; Leger, P.; Carsten, J.; Tompkins, V.; Hartman, F.; Yen, J.
2013-01-01
The Robotic Arm (RA) has operated for more than 200 Martian solar days (or sols) since the Mars Science Laboratory rover touched down in Gale Crater on August 5, 2012. During the first seven months on Mars the robotic arm has performed multiple contact science sols including the positioning of the Alpha Particle X-Ray Spectrometer (APXS) and/or Mars Hand Lens Imager (MAHLI) with respect to rocks or loose regolith targets. The RA has supported sample acquisition using both the scoop and drill, sample processing with CHIMRA (Collection and Handling for In- Situ Martian Rock Analysis), and delivery of sample portions to the observation tray, and the SAM (Sample Analysis at Mars) and CHEMIN (Chemistry and Mineralogy) science instruments. This paper describes the planning and execution of robotic arm activities during surface operations, and reviews robotic arm performance results from Mars to date.
Multi-centre audit of VMAT planning and pre-treatment verification.
Jurado-Bruggeman, Diego; Hernández, Victor; Sáez, Jordi; Navarro, David; Pino, Francisco; Martínez, Tatiana; Alayrach, Maria-Elena; Ailleres, Norbert; Melero, Alejandro; Jornet, Núria
2017-08-01
We performed a multi-centre intercomparison of VMAT dose planning and pre-treatment verification. The aims were to analyse the dose plans in terms of dosimetric quality and deliverability, and to validate whether in-house pre-treatment verification results agreed with those of an external audit. The nine participating centres encompassed different machines, equipment, and methodologies. Two mock cases (prostate and head and neck) were planned using one and two arcs. A plan quality index was defined to compare the plans and different complexity indices were calculated to check their deliverability. We compared gamma index pass rates using the centre's equipment and methodology to those of an external audit (global 3D gamma, absolute dose differences, 10% of maximum dose threshold). Log-file analysis was performed to look for delivery errors. All centres fulfilled the dosimetric goals but plan quality and delivery complexity were heterogeneous and uncorrelated, depending on the manufacturer and the planner's methodology. Pre-treatment verifications results were within tolerance in all cases for gamma 3%-3mm evaluation. Nevertheless, differences between the external audit and in-house measurements arose due to different equipment or methodology, especially for 2%-2mm criteria with differences up to 20%. No correlation was found between complexity indices and verification results amongst centres. All plans fulfilled dosimetric constraints, but plan quality and complexity did not correlate and were strongly dependent on the planner and the vendor. In-house measurements cannot completely replace external audits for credentialing. Copyright © 2017 Elsevier B.V. All rights reserved.
Marketing approaches for OTC analgesics in Bulgaria
Petkova, Valentina; Valchanova, Velislava; Ibrahim, Adel; Nikolova, Irina; Benbasat, Niko; Dimitrov, Milen
2014-01-01
The marketing management includes analysis of market opportunities, selection of target markets, planning, developing and implementing of marketing strategies, monitoring and result control. The object of the present study was to analyse the marketing approaches applied for non-steroidal anti-inflammatory drugs (NSAIDs) in Bulgaria. The performed SWOT(planning method used to evaluate the strengths, weaknesses, opportunities, and threats) analysis for one of the leading Bulgarian manufacturers marked the complex corporative strategy for stimulating the sales of NSAIDs. The study results show that the legislation frame in the country gives an opportunity for regulation of the NSAID market in order that incorrect marketing approaches such as disloyal competition are avoided. PMID:26019521
Marketing approaches for OTC analgesics in Bulgaria.
Petkova, Valentina; Valchanova, Velislava; Ibrahim, Adel; Nikolova, Irina; Benbasat, Niko; Dimitrov, Milen
2014-03-04
The marketing management includes analysis of market opportunities, selection of target markets, planning, developing and implementing of marketing strategies, monitoring and result control. The object of the present study was to analyse the marketing approaches applied for non-steroidal anti-inflammatory drugs (NSAIDs) in Bulgaria. The performed SWOT(planning method used to evaluate the strengths, weaknesses, opportunities, and threats) analysis for one of the leading Bulgarian manufacturers marked the complex corporative strategy for stimulating the sales of NSAIDs. The study results show that the legislation frame in the country gives an opportunity for regulation of the NSAID market in order that incorrect marketing approaches such as disloyal competition are avoided.
Salehi Shahrabi, Narges; Pourezzat, Aliasghar; Mobaraki, Hossein; Mafimoradi, Shiva
2013-01-01
Abstract Background The centralization of human activities is associated with different pollutants which enter into environment easily and cause the urban environment more vulnerable. Regarding the importance of air pollution issue for Tehran metropolis, many plans and regulations have been developed. However, most of them failed to decline the pollution. The purpose of this study was to pathologically analyze air-pollution control plans to offer effective solutions for Tehran metropolis. Methods A Qualitative content analysis in addition to a semi-structured interview with 14 practicing professional were used to identify 1) key sources of Tehran’s air pollution, 2) recognize challenges towards effective performance of pertinent plans and 3), offer effective solutions. Results Related challenges to air-pollution control plans can be divided into two major categories including lack of integrated and organized stewardship and PEST challenges. Conclusion For controlling the air pollution of Tehran effectively, various controlling alternatives were identified as systematization of plan preparation process, standardization and utilization of new technologies & experts, infrastructural development, realization of social justice, developing coordination mechanisms, improving citizens’ participatory capacity and focusing on effective management of fuel and energy. Controlling air pollution in Tehran needs a serious attention of policymakers to make enforcements through applying a systemic cycle of preparation comprehensive plans. Further, implement the enforcements and evaluate the environmental impact of the plans through involving all stakeholders. PMID:26171340
Contraceptive social marketing: a continuous cycle of planning, testing and evaluating.
1985-01-01
This article outlines the contraceptive marketing process used by the Social Marketing for Change (SOMARC) project. The 1st stage of the process involves analysis of the market, the consumer, and the social marketing organization's capabilities. In the 2nd stage, planning, data collected in the analysis stage are used to define objectives, segment target markets, and devise strategies for each element in the marketing mix. In the 3rd stage, all the elements in the marketing mix are developed and tested (e.g. product concepts, pricing, packaging, communication messages) and refined on the basis of test results. In stage 4, the action plan is implemented and marketing progress and institutional performance are monitored. Stage 5 includes an assessment of in-market effectiveness in terms of responses from consumers, retailers, and health professionals. The last stage feeds back to the 1st. All the reviewed data are recycled into analysis to begin again the continuous process of refinement and improvement.
Fast Missile Boat Project Planning using CPM and What If Analysis Method
NASA Astrophysics Data System (ADS)
Silvianita; Firmansyah, R.; Rosyid, D. M.; Suntoyo; Chamelia, D. M.
2018-03-01
This paper discusses analysis of fast ship missile project planning with CPM and What If analysis.The poor performance can cause project delay and cost overruns, these two things often occur in a project management. Scheduling has an important role to control the project. Good scheduling is required because it will affect the product quality. Scheduling is useful to manage the activities so that the project completion time can be as short as possible and it is used to determine the costs of the project are in optimum condition. The alternatives that can be used to overcome the delay project namely increasing labor and equipment.Project planning can be done to determine whether the project is already in an optimum condition. Alternatives that can be used to overcome the delay in the project is to increase labor and equipment, the next is to look for the optimum solution taking into account the duration and gain of each alternative.
NASA Technical Reports Server (NTRS)
Antonille, Scott R.; Miskey, Cherie L.; Ohl, Raymond G.; Rohrbach, Scott O.; Aronstein, David L.; Bartoszyk, Andrew E.; Bowers, Charles W.; Cofie, Emmanuel; Collins, Nicholas R.; Comber, Brian J.;
2016-01-01
NASA's James Webb Space Telescope (JWST) is a 6.6m diameter, segmented, deployable telescope for cryogenic IR space astronomy (40K). The JWST Observatory includes the Optical Telescope Element (OTE) and the Integrated Science Instrument Module (ISIM) that contains four science instruments (SI) and the fine guider. The SIs are mounted to a composite metering structure. The SI and guider units were integrated to the ISIM structure and optically tested at the NASA Goddard Space Flight Center as a suite using the Optical Telescope Element SIMulator (OSIM). OSIM is a full field, cryogenic JWST telescope simulator. SI performance, including alignment and wave front error, were evaluated using OSIM. We describe test and analysis methods for optical performance verification of the ISIM Element, with an emphasis on the processes used to plan and execute the test. The complexity of ISIM and OSIM drove us to develop a software tool for test planning that allows for configuration control of observations, associated scripts, and management of hardware and software limits and constraints, as well as tools for rapid data evaluation, and flexible re-planning in response to the unexpected. As examples of our test and analysis approach, we discuss how factors such as the ground test thermal environment are compensated in alignment. We describe how these innovative methods for test planning and execution and post-test analysis were instrumental in the verification program for the ISIM element, with enough information to allow the reader to consider these innovations and lessons learned in this successful effort in their future testing for other programs.
NASA Astrophysics Data System (ADS)
Antonille, Scott R.; Miskey, Cherie L.; Ohl, Raymond G.; Rohrbach, Scott O.; Aronstein, David L.; Bartoszyk, Andrew E.; Bowers, Charles W.; Cofie, Emmanuel; Collins, Nicholas R.; Comber, Brian J.; Eichhorn, William L.; Glasse, Alistair C.; Gracey, Renee; Hartig, George F.; Howard, Joseph M.; Kelly, Douglas M.; Kimble, Randy A.; Kirk, Jeffrey R.; Kubalak, David A.; Landsman, Wayne B.; Lindler, Don J.; Malumuth, Eliot M.; Maszkiewicz, Michael; Rieke, Marcia J.; Rowlands, Neil; Sabatke, Derek S.; Smith, Corbett T.; Smith, J. Scott; Sullivan, Joseph F.; Telfer, Randal C.; Te Plate, Maurice; Vila, M. Begoña.; Warner, Gerry D.; Wright, David; Wright, Raymond H.; Zhou, Julia; Zielinski, Thomas P.
2016-09-01
NASA's James Webb Space Telescope (JWST) is a 6.5m diameter, segmented, deployable telescope for cryogenic IR space astronomy. The JWST Observatory includes the Optical Telescope Element (OTE) and the Integrated Science Instrument Module (ISIM), that contains four science instruments (SI) and the Fine Guidance Sensor (FGS). The SIs are mounted to a composite metering structure. The SIs and FGS were integrated to the ISIM structure and optically tested at NASA's Goddard Space Flight Center using the Optical Telescope Element SIMulator (OSIM). OSIM is a full-field, cryogenic JWST telescope simulator. SI performance, including alignment and wavefront error, was evaluated using OSIM. We describe test and analysis methods for optical performance verification of the ISIM Element, with an emphasis on the processes used to plan and execute the test. The complexity of ISIM and OSIM drove us to develop a software tool for test planning that allows for configuration control of observations, implementation of associated scripts, and management of hardware and software limits and constraints, as well as tools for rapid data evaluation, and flexible re-planning in response to the unexpected. As examples of our test and analysis approach, we discuss how factors such as the ground test thermal environment are compensated in alignment. We describe how these innovative methods for test planning and execution and post-test analysis were instrumental in the verification program for the ISIM element, with enough information to allow the reader to consider these innovations and lessons learned in this successful effort in their future testing for other programs.
Amponsah, Kwame; Ellis, Thomas L; Chan, Michael D; Lovato, James F; Bourland, J Daniel; deGuzman, Allan F; Ekstrand, Kenneth E; Munley, Michael T; McMullen, Kevin P; Shaw, Edward G; Tatter, Stephen B
2012-10-01
It has been well established that Gamma Knife radiosurgery (GKS) is an effective treatment for brain arteriovenous malformations (AVMs). To evaluate complete obliteration rates for magnetic resonance imaging (MRI)-based GKS treatment planning performed with and without angiography and to conduct a preliminary assessment of the utility of using pulsed arterial spin labeling (PASL) magnetic resonance (MR) perfusion imaging to confirm complete obliteration. Forty-six patients were identified who had undergone GKS without embolization with a minimum follow-up of 2 years. One group was planned with integrated stereotactic angiography and MR (spoiled gradient recalled) images obtained on the day of GKS. A second technique avoided the risk of arteriography by using only axial MR images. Beginning in 2007, PASL MR perfusion imaging was routinely performed as a portion of the follow-up MRI to assess the restoration of normal blood flow of the nidus and surrounding area. The overall obliteration rate for the angiography/MRI group was 88.0% (29 of 33). Patients in the MRI-only group had an obliteration rate of 61.5% (8 of 13), with P=.092 with the Fisher exact test, which is not statistically significant. A Kaplan-Meier analysis was also not statistically significant (log rank test, P=.474). Four of 9 patients with incomplete obliteration on angiography also had shown residual abnormal blood flow on PASL imaging. This retrospective analysis shows that treatment planning technique used in GKS does not play a role in the eventual obliteration of treated AVMs. PASL may have potential in the evaluation of AVM obliteration.
Framework for Multidisciplinary Analysis, Design, and Optimization with High-Fidelity Analysis Tools
NASA Technical Reports Server (NTRS)
Orr, Stanley A.; Narducci, Robert P.
2009-01-01
A plan is presented for the development of a high fidelity multidisciplinary optimization process for rotorcraft. The plan formulates individual disciplinary design problems, identifies practical high-fidelity tools and processes that can be incorporated in an automated optimization environment, and establishes statements of the multidisciplinary design problem including objectives, constraints, design variables, and cross-disciplinary dependencies. Five key disciplinary areas are selected in the development plan. These are rotor aerodynamics, rotor structures and dynamics, fuselage aerodynamics, fuselage structures, and propulsion / drive system. Flying qualities and noise are included as ancillary areas. Consistency across engineering disciplines is maintained with a central geometry engine that supports all multidisciplinary analysis. The multidisciplinary optimization process targets the preliminary design cycle where gross elements of the helicopter have been defined. These might include number of rotors and rotor configuration (tandem, coaxial, etc.). It is at this stage that sufficient configuration information is defined to perform high-fidelity analysis. At the same time there is enough design freedom to influence a design. The rotorcraft multidisciplinary optimization tool is built and substantiated throughout its development cycle in a staged approach by incorporating disciplines sequentially.
The "beauty arch: " a new aesthetic analysis for malar augmentation planning.
Marianetti, Tito Matteo; Cozzolino, Salvatore; Torroni, Andrea; Gasparini, Giulio; Pelo, Sandro
2015-05-01
Midface is a critical area for the aesthetics of the face. Despite malar hypoplasia is often combined with a class III malocclusion, there are few studies focusing on the results of a combined approach of malar implants and Le Fort I. We describe a new aesthetic analysis, named "beauty arch" analysis, for the assessment of sagittal projection of the malar region. We took a reference group of 74 Italian women participating in a national beauty contest in 2011 on which we performed our analysis. We used the ideal values to elaborate the surgical treatment planning of a second group of 45 consecutive female patients affected by skeletal class III malocclusion.Twenty-three patients undergo simultaneous Le Fort I osteotomy and malar implants. From the descriptive statistical comparison of the patients' values before and after orthognathic surgery and malar implants with the reference values, we observed how all parameters considered got closer to the ideal population. We consider our beauty arch a useful help for surgeon in the treatment planning of patients with skeletal malocclusions and malar implants.
Visit from JAXA to NASA MSFC: The Engines Element & Ideas for Collaboration
NASA Technical Reports Server (NTRS)
Greene, William D.
2013-01-01
System Design, Development, and Fabrication: Design, develop, and fabricate or procure MB-60 component hardware compliant with the imposed technical requirements and in sufficient quantities to fulfill the overall MB-60 development effort. System Development, Assembly, and Test: Manage the scope of the development, assembly, and test-related activities for MB-60 development. This scope includes engine-level development planning, engine assembly and disassembly, test planning, engine testing, inspection, anomaly resolution, and development of necessary ground support equipment and special test equipment. System Integration: Provide coordinated integration in the realms of engineering, safety, quality, and manufacturing disciplines across the scope of the MB-60 design and associated products development Safety and Mission Assurance, structural design, fracture control, materials and processes, thermal analysis. Systems Engineering and Analysis: Manage and perform Systems Engineering and Analysis to provide rigor and structure to the overall design and development effort for the MB-60. Milestone reviews, requirements management, system analysis, program management support Program Management: Manage, plan, and coordinate the activities across all portions of the MB-60 work scope by providing direction for program administration, business management, and supplier management.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-23
... of Environmental Protection performed a missing data analysis for this site in accordance with the regulatory requirements of 40 CFR part 50, Appendix I. The Massachusetts missing data analysis used a combination of meteorology and air quality data for ozone monitors near the Adams site for the missing days to...
Tongass National Forest timber demand: projections for 2015 to 2030
Jean M. Daniels; Michael D. Paruszkiewicz; Susan J. Alexander
2016-01-01
Projections of Alaska timber products output; the derived demand for logs, lumber, residues, and niche products; and timber harvest by owner were developed using a trend-based analysis. This is the fifth such analysis performed since 1990 to assist planners in meeting statutory requirements for estimating planning-cycle demand for timber from the Tongass National...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Calvo Ortega, Juan Francisco, E-mail: jfcdrr@yahoo.es; Moragues, Sandra; Pozo, Miquel
2014-07-01
The aim of this study is to assess the accuracy of a convolution-based algorithm (anisotropic analytical algorithm [AAA]) implemented in the Eclipse planning system for intensity-modulated radiosurgery (IMRS) planning of small cranial targets by using a 5-mm leaf-width multileaf collimator (MLC). Overall, 24 patient-based IMRS plans for cranial lesions of variable size (0.3 to 15.1 cc) were planned (Eclipse, AAA, version 10.0.28) using fixed field-based IMRS produced by a Varian linear accelerator equipped with a 120 MLC (5-mm width on central leaves). Plan accuracy was evaluated according to phantom-based measurements performed with radiochromic film (EBT2, ISP, Wayne, NJ). Film 2Dmore » dose distributions were performed with the FilmQA Pro software (version 2011, Ashland, OH) by using the triple-channel dosimetry method. Comparison between computed and measured 2D dose distributions was performed using the gamma method (3%/1 mm). Performance of the MLC was checked by inspection of the DynaLog files created by the linear accelerator during the delivery of each dynamic field. The absolute difference between the calculated and measured isocenter doses for all the IMRS plans was 2.5% ± 2.1%. The gamma evaluation method resulted in high average passing rates of 98.9% ± 1.4% (red channel) and 98.9% ± 1.5% (blue and green channels). DynaLog file analysis revealed a maximum root mean square error of 0.46 mm. According to our results, we conclude that the Eclipse/AAA algorithm provides accurate cranial IMRS dose distributions that may be accurately delivered by a Varian linac equipped with a Millennium 120 MLC.« less
James Webb Space Telescope Orbit Determination Analysis
NASA Technical Reports Server (NTRS)
Yoon, Sungpil; Rosales, Jose; Richon, Karen
2014-01-01
The James Webb Space Telescope (JWST) is designed to study and answer fundamental astrophysical questions from an orbit about the Sun-Earth/Moon L2 libration point, 1.5 million km away from Earth. This paper describes the results of an orbit determination (OD) analysis of the JWST mission emphasizing the challenges specific to this mission in various mission phases. Three mid-course correction (MCC) maneuvers during launch and early orbit phase and transfer orbit phase are required for the spacecraft to reach L2. These three MCC maneuvers are MCC-1a at Launch+12 hours, MCC-1b at L+2.5 days and MCC-2 at L+30 days. Accurate OD solutions are needed to support MCC maneuver planning. A preliminary analysis shows that OD performance with the given assumptions is adequate to support MCC maneuver planning. During the nominal science operations phase, the mission requires better than 2 cm/sec velocity estimation performance to support stationkeeping maneuver planning. The major challenge to accurate JWST OD during the nominal science phase results from the unusually large solar radiation pressure force acting on the huge sunshield. Other challenges are stationkeeping maneuvers at 21-day intervals to keep JWST in orbit around L2, frequent attitude reorientations to align the JWST telescope with its targets and frequent maneuvers to unload momentum accumulated in the reaction wheels. Monte Carlo analysis shows that the proposed OD approach can produce solutions that meet the mission requirements.
McKenzie, Elizabeth M.; Balter, Peter A.; Stingo, Francesco C.; Jones, Jimmy; Followill, David S.; Kry, Stephen F.
2014-01-01
Purpose: The authors investigated the performance of several patient-specific intensity-modulated radiation therapy (IMRT) quality assurance (QA) dosimeters in terms of their ability to correctly identify dosimetrically acceptable and unacceptable IMRT patient plans, as determined by an in-house-designed multiple ion chamber phantom used as the gold standard. A further goal was to examine optimal threshold criteria that were consistent and based on the same criteria among the various dosimeters. Methods: The authors used receiver operating characteristic (ROC) curves to determine the sensitivity and specificity of (1) a 2D diode array undergoing anterior irradiation with field-by-field evaluation, (2) a 2D diode array undergoing anterior irradiation with composite evaluation, (3) a 2D diode array using planned irradiation angles with composite evaluation, (4) a helical diode array, (5) radiographic film, and (6) an ion chamber. This was done with a variety of evaluation criteria for a set of 15 dosimetrically unacceptable and 9 acceptable clinical IMRT patient plans, where acceptability was defined on the basis of multiple ion chamber measurements using independent ion chambers and a phantom. The area under the curve (AUC) on the ROC curves was used to compare dosimeter performance across all thresholds. Optimal threshold values were obtained from the ROC curves while incorporating considerations for cost and prevalence of unacceptable plans. Results: Using common clinical acceptance thresholds, most devices performed very poorly in terms of identifying unacceptable plans. Grouping the detector performance based on AUC showed two significantly different groups. The ion chamber, radiographic film, helical diode array, and anterior-delivered composite 2D diode array were in the better-performing group, whereas the anterior-delivered field-by-field and planned gantry angle delivery using the 2D diode array performed less well. Additionally, based on the AUCs, there was no significant difference in the performance of any device between gamma criteria of 2%/2 mm, 3%/3 mm, and 5%/3 mm. Finally, optimal cutoffs (e.g., percent of pixels passing gamma) were determined for each device and while clinical practice commonly uses a threshold of 90% of pixels passing for most cases, these results showed variability in the optimal cutoff among devices. Conclusions: IMRT QA devices have differences in their ability to accurately detect dosimetrically acceptable and unacceptable plans. Field-by-field analysis with a MapCheck device and use of the MapCheck with a MapPhan phantom while delivering at planned rotational gantry angles resulted in a significantly poorer ability to accurately sort acceptable and unacceptable plans compared with the other techniques examined. Patient-specific IMRT QA techniques in general should be thoroughly evaluated for their ability to correctly differentiate acceptable and unacceptable plans. Additionally, optimal agreement thresholds should be identified and used as common clinical thresholds typically worked very poorly to identify unacceptable plans. PMID:25471949
McKenzie, Elizabeth M; Balter, Peter A; Stingo, Francesco C; Jones, Jimmy; Followill, David S; Kry, Stephen F
2014-12-01
The authors investigated the performance of several patient-specific intensity-modulated radiation therapy (IMRT) quality assurance (QA) dosimeters in terms of their ability to correctly identify dosimetrically acceptable and unacceptable IMRT patient plans, as determined by an in-house-designed multiple ion chamber phantom used as the gold standard. A further goal was to examine optimal threshold criteria that were consistent and based on the same criteria among the various dosimeters. The authors used receiver operating characteristic (ROC) curves to determine the sensitivity and specificity of (1) a 2D diode array undergoing anterior irradiation with field-by-field evaluation, (2) a 2D diode array undergoing anterior irradiation with composite evaluation, (3) a 2D diode array using planned irradiation angles with composite evaluation, (4) a helical diode array, (5) radiographic film, and (6) an ion chamber. This was done with a variety of evaluation criteria for a set of 15 dosimetrically unacceptable and 9 acceptable clinical IMRT patient plans, where acceptability was defined on the basis of multiple ion chamber measurements using independent ion chambers and a phantom. The area under the curve (AUC) on the ROC curves was used to compare dosimeter performance across all thresholds. Optimal threshold values were obtained from the ROC curves while incorporating considerations for cost and prevalence of unacceptable plans. Using common clinical acceptance thresholds, most devices performed very poorly in terms of identifying unacceptable plans. Grouping the detector performance based on AUC showed two significantly different groups. The ion chamber, radiographic film, helical diode array, and anterior-delivered composite 2D diode array were in the better-performing group, whereas the anterior-delivered field-by-field and planned gantry angle delivery using the 2D diode array performed less well. Additionally, based on the AUCs, there was no significant difference in the performance of any device between gamma criteria of 2%/2 mm, 3%/3 mm, and 5%/3 mm. Finally, optimal cutoffs (e.g., percent of pixels passing gamma) were determined for each device and while clinical practice commonly uses a threshold of 90% of pixels passing for most cases, these results showed variability in the optimal cutoff among devices. IMRT QA devices have differences in their ability to accurately detect dosimetrically acceptable and unacceptable plans. Field-by-field analysis with a MapCheck device and use of the MapCheck with a MapPhan phantom while delivering at planned rotational gantry angles resulted in a significantly poorer ability to accurately sort acceptable and unacceptable plans compared with the other techniques examined. Patient-specific IMRT QA techniques in general should be thoroughly evaluated for their ability to correctly differentiate acceptable and unacceptable plans. Additionally, optimal agreement thresholds should be identified and used as common clinical thresholds typically worked very poorly to identify unacceptable plans.
SRB/SLEEC (Solid Rocket Booster/Shingle Lap Extendible Exit Cone) feasibility study, volume 1
NASA Technical Reports Server (NTRS)
Baker, William H., Jr.
1986-01-01
A preliminary design and analysis was completed for a SLEEC (Shingle Lap Extendible Exit Cone) which could be incorporated on the Space Transportation System (STS) Solid Rocket Booster (SRB). Studies were completed which predicted weights and performance increases and development plans were prepared for the full-scale bench and static test of SLEEC. In conjunction with the design studies, a series of supporting analyses were performed to assure the validity and feasibility of performance, fabrication, cost, and reliability for the selected design. The feasibility and required amounts of bench, static firing, and flight tests considered necessary for the successful incorporation of SLEEC on the Shuttle SRBs were determined. Preliminary plans were completed which define both a follow on study effort and a development program.
Integrated Campaign Probabilistic Cost, Schedule, Performance, and Value for Program Office Support
NASA Technical Reports Server (NTRS)
Cornelius, David; Sasamoto, Washito; Daugherty, Kevin; Deacon, Shaun
2012-01-01
This paper describes an integrated assessment tool developed at NASA Langley Research Center that incorporates probabilistic analysis of life cycle cost, schedule, launch performance, on-orbit performance, and value across a series of planned space-based missions, or campaign. Originally designed as an aid in planning the execution of missions to accomplish the National Research Council 2007 Earth Science Decadal Survey, it utilizes Monte Carlo simulation of a series of space missions for assessment of resource requirements and expected return on investment. Interactions between simulated missions are incorporated, such as competition for launch site manifest, to capture unexpected and non-linear system behaviors. A novel value model is utilized to provide an assessment of the probabilistic return on investment. A demonstration case is discussed to illustrate the tool utility.
Stork, Matthew J; Graham, Jeffrey D; Bray, Steven R; Martin Ginis, Kathleen A
2017-07-01
Thirty students (mean age = 18 ± 0.5 years) completed self-report (Self-Control Scale) and objective (isometric handgrip squeeze performance) measures of self-control, provided their exercise and academic (study/schoolwork) plans for the next month, and then logged these behaviors over the subsequent 4-week period. Trait self-control predicted exercise and academic behavior. Handgrip squeeze performance predicted academic behavior and adherence to academic plans. Further, regression analysis revealed that trait self-control and handgrip performance explained significant variance in academic behavior. These findings provide a new understanding of how different self-control measures can be used to predict first-year students' participation in, and adherence to, exercise and academic behaviors concurrently.
Improved Test Planning and Analysis Through the Use of Advanced Statistical Methods
NASA Technical Reports Server (NTRS)
Green, Lawrence L.; Maxwell, Katherine A.; Glass, David E.; Vaughn, Wallace L.; Barger, Weston; Cook, Mylan
2016-01-01
The goal of this work is, through computational simulations, to provide statistically-based evidence to convince the testing community that a distributed testing approach is superior to a clustered testing approach for most situations. For clustered testing, numerous, repeated test points are acquired at a limited number of test conditions. For distributed testing, only one or a few test points are requested at many different conditions. The statistical techniques of Analysis of Variance (ANOVA), Design of Experiments (DOE) and Response Surface Methods (RSM) are applied to enable distributed test planning, data analysis and test augmentation. The D-Optimal class of DOE is used to plan an optimally efficient single- and multi-factor test. The resulting simulated test data are analyzed via ANOVA and a parametric model is constructed using RSM. Finally, ANOVA can be used to plan a second round of testing to augment the existing data set with new data points. The use of these techniques is demonstrated through several illustrative examples. To date, many thousands of comparisons have been performed and the results strongly support the conclusion that the distributed testing approach outperforms the clustered testing approach.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ditmars, J.D.; Walbridge, E.W.; Rote, D.M.
1983-10-01
Repository performance assessment is analysis that identifies events and processes that might affect a repository system for isolation of radioactive waste, examines their effects on barriers to waste migration, and estimates the probabilities of their occurrence and their consequences. In 1983 Battelle Memorial Institute's Office of Nuclear Waste Isolation (ONWI) prepared two plans - one for performance assessment for a waste repository in salt and one for verification and validation of performance assessment technology. At the request of the US Department of Energy's Salt Repository Project Office (SRPO), Argonne National Laboratory reviewed those plans and prepared this report to advisemore » SRPO of specific areas where ONWI's plans for performance assessment might be improved. This report presents a framework for repository performance assessment that clearly identifies the relationships among the disposal problems, the processes underlying the problems, the tools for assessment (computer codes), and the data. In particular, the relationships among important processes and 26 model codes available to ONWI are indicated. A common suggestion for computer code verification and validation is the need for specific and unambiguous documentation of the results of performance assessment activities. A major portion of this report consists of status summaries of 27 model codes indicated as potentially useful by ONWI. The code summaries focus on three main areas: (1) the code's purpose, capabilities, and limitations; (2) status of the elements of documentation and review essential for code verification and validation; and (3) proposed application of the code for performance assessment of salt repository systems. 15 references, 6 figures, 4 tables.« less
Personnel Requirements Consideration in Major Weapon System Acquisition. Research Planning Report
1980-03-01
of scientific study of human attributes associated with job performance. Sir Francis Galton (1822-1911) is considered the father of engineering...analysis of nonrelevant factors. Implementation of this plan will result in construction and pilot testing of a computer based branching decision...logic in 1980-81 and field testing and evaluation in 1981-82. . . 1. SSCuaITY CLASIPICATION Op TuiS PAOI(’I.A baa. Seoto, I Finch, F.L., Rigg, K.E. and
Decision making in high-velocity environments: implications for healthcare.
Stepanovich, P L; Uhrig, J D
1999-01-01
Healthcare can be considered a high-velocity environment and, as such, can benefit from research conducted in other industries regarding strategic decision making. Strategic planning is not only relevant to firms in high-velocity environments, but is also important for high performance and survival. Specifically, decision-making speed seems to be instrumental in differentiating between high and low performers; fast decision makers outperform slow decision makers. This article outlines the differences between fast and slow decision makers, identifies five paralyses that can slow decision making in healthcare, and outlines the role of a planning department in circumventing these paralyses. Executives can use the proposed planning structure to improve both the speed and quality of strategic decisions. The structure uses planning facilitators to avoid the following five paralyses: 1. Analysis. Decision makers can no longer afford the luxury of lengthy, detailed analysis but must develop real-time systems that provide appropriate, timely information. 2. Alternatives. Many alternatives (beyond the traditional two or three) need to be considered and the alternatives must be evaluated simultaneously. 3. Group Think. Decision makers must avoid limited mind-sets and autocratic leadership styles by seeking out independent, knowledgeable counselors. 4. Process. Decision makers need to resolve conflicts through "consensus with qualification," as opposed to waiting for everyone to come on board. 5. Separation. Successful implementation requires a structured process that cuts across disciplines and levels.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carlsbad Field Office
The Performance Demonstration Program (PDP) for headspace gases distributes blind audit samples in a gas matrix for analysis of volatile organic compounds (VOCs). Participating measurement facilities (i.e., fixed laboratories, mobile analysis systems, and on-line analytical systems) are located across the United States. Each sample distribution is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements performed for transuranic (TRU) waste characterization. The primary documents governing the conduct of the PDP are the Quality Assurance Program Document (QAPD) (DOE/CBFO-94-1012) and the Waste Isolation Pilot Plant (WIPP) Waste Analysis Plan (WAP) contained in the Hazardousmore » Waste Facility Permit (NM4890139088-TSDF) issued by the New Mexico Environment Department (NMED). The WAP requires participation in the PDP; the PDP must comply with the QAPD and the WAP. This plan implements the general requirements of the QAPD and the applicable requirements of the WAP for the Headspace Gas (HSG) PDP. Participating measurement facilities analyze blind audit samples of simulated TRU waste package headspace gases according to the criteria set by this PDP Plan. Blind audit samples (hereafter referred to as PDP samples) are used as an independent means to assess each measurement facility’s compliance with the WAP quality assurance objectives (QAOs). To the extent possible, the concentrations of VOC analytes in the PDP samples encompass the range of concentrations anticipated in actual TRU waste package headspace gas samples. Analyses of headspace gases are required by the WIPP to demonstrate compliance with regulatory requirements. These analyses must be performed by measurement facilities that have demonstrated acceptable performance in this PDP. These analyses are referred to as WIPP analyses and the TRU waste package headspace gas samples on which they are performed are referred to as WIPP samples in this document. Participating measurement facilities must analyze PDP samples using the same procedures used for routine waste characterization analyses of WIPP samples.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carlsbad Field Office
The Performance Demonstration Program (PDP) for headspace gases distributes sample gases of volatile organic compounds (VOCs) for analysis. Participating measurement facilities (i.e., fixed laboratories, mobile analysis systems, and on-line analytical systems) are located across the United States. Each sample distribution is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements performed for transuranic (TRU) waste characterization. The primary documents governing the conduct of the PDP are the Quality Assurance Program Document (QAPD) (DOE/CBFO-94-1012) and the Waste Isolation Pilot Plant (WIPP) Waste Analysis Plan (WAP) contained in the Hazardous Waste Facility Permit (NM4890139088-TSDF) issuedmore » by the New Mexico Environment Department (NMED). The WAP requires participation in the PDP; the PDP must comply with the QAPD and the WAP. This plan implements the general requirements of the QAPD and the applicable requirements of the WAP for the Headspace Gas (HSG) PDP. Participating measurement facilities analyze blind audit samples of simulated TRU waste package headspace gases according to the criteria set by this PDP Plan. Blind audit samples (hereafter referred to as PDP samples) are used as an independent means to assess each measurement facility’s compliance with the WAP quality assurance objectives (QAOs). To the extent possible, the concentrations of VOC analytes in the PDP samples encompass the range of concentrations anticipated in actual TRU waste package headspace gas samples. Analyses of headspace gases are required by the WIPP to demonstrate compliance with regulatory requirements. These analyses must be performed by measurement facilities that have demonstrated acceptable performance in this PDP. These analyses are referred to as WIPP analyses and the TRU waste package headspace gas samples on which they are performed are referred to as WIPP samples in this document. Participating measurement facilities must analyze PDP samples using the same procedures used for routine waste characterization analyses of WIPP samples.« less
An analysis of the determinants of family planning volunteer workers' performance in Iloilo City.
David, F; Chin, F
1993-01-01
This report analyzes data from a survey of 106 Barangay (village) Service Point Officers (BSPOs) associated with the City Population Office and 106 Barangay Health Workers (BHWs) associated with the City Health Office to compare the family planning (FP) service delivery performance of these voluntary workers in Iloilo City in the Philippines and to quantify the effects of the factors which influence their performance. Both the BSPOs and the BHWs assist in the delivery of health and FP services at the grassroots level. The survey data were supplemented with interviews with key informants, focus group discussions with married couples of reproductive age, clinic records, and observations of the BSPOs and BHWs at work. The analysis compared the sociodemographic characteristics of the two groups; the recruitment procedures followed (if any); FP training; actual FP-related work; involvement in community organizing; incentives received; supervision of the volunteers; attitude towards their work; FP knowledge, attitude, and practice; time allocated to FP activities; number of clients served; and number of clients counseled. Correlation analysis of factors influencing volunteer performance indicated that FP training had the largest positive influence on FP activities. The output of the workers was also positively affected by the amount of time spend in FP activities and by their involvement in community organizing. The commitment of the workers had a significant impact on the number of clients they resupplied with contraceptives. Variation in the FP performances of the two groups was caused by the fact that delivery of FP services is a major role of the BSPOs and only one of many responsibilities of the BHWs. These findings reinforce the planned restructuring of Iloilo City's FP program which would once again designate the Population Office as the lead agency. Increasing the knowledge of these volunteers about the side effects and contraindications of various methods should have a positive effect on continuation rates. Recruitment of volunteers should be based on the individual's level of interest and commitment.
Gamma Ray Observatory (GRO) OBC attitude error analysis
NASA Technical Reports Server (NTRS)
Harman, R. R.
1990-01-01
This analysis involves an in-depth look into the onboard computer (OBC) attitude determination algorithm. A review of TRW error analysis and necessary ground simulations to understand the onboard attitude determination process are performed. In addition, a plan is generated for the in-flight calibration and validation of OBC computed attitudes. Pre-mission expected accuracies are summarized and sensitivity of onboard algorithms to sensor anomalies and filter tuning parameters are addressed.
Louisiana's 2017 Master Plan for a Sustainable Coast
NASA Astrophysics Data System (ADS)
Haase, B.
2017-12-01
The Coastal Protection and Restoration Authority is charged with coordinating restoration and protection investments through the development and implementation of Louisiana's Comprehensive Master Plan for a Sustainable Coast. The first master plan was submitted to the Louisiana Legislature in 2007 and is mandated to be updated every five years. The plan's objectives are to reduce economic losses from flooding, promote sustainability by harnessing natural processes, provide habitats for commercial and recreational activities, sustain cultural heritage and promote a viable working coast. Two goals drive decision making about the appropriate suite of restoration and protection projects to include in the Plan: restore and maintain Louisiana's wetlands and provide flood protection for coastal Louisiana's citizens. As part of the decision making process, a wide range of additional metrics are used to evaluate the complex, competing needs of communities, industries, navigation and fisheries. The master plan decision making process includes the identification of individual protection and restoration projects that are evaluated with landscape, storm surge, and risk assessment models and then ranked by how well they perform over time across the set of decision drivers and metrics. High performing projects are assembled into alternatives constrained by available funding and river resources. The planning process is grounded not only on extensive scientific analysis but also on interdisciplinary collaboration between scientists, engineers, planners, community advocates, and coastal stakeholders which creates the long-term dialogue needed for complex environmental planning decisions. It is through this collaboration that recommended alternatives are reviewed and modified to develop the final Plan. Keywords:alternative formulation, comprehensive planning, ecosystem restoration, flood risk reduction and stakeholder engagement
Demonstrating High-Accuracy Orbital Access Using Open-Source Tools
NASA Technical Reports Server (NTRS)
Gilbertson, Christian; Welch, Bryan
2017-01-01
Orbit propagation is fundamental to almost every space-based analysis. Currently, many system analysts use commercial software to predict the future positions of orbiting satellites. This is one of many capabilities that can replicated, with great accuracy, without using expensive, proprietary software. NASAs SCaN (Space Communication and Navigation) Center for Engineering, Networks, Integration, and Communications (SCENIC) project plans to provide its analysis capabilities using a combination of internal and open-source software, allowing for a much greater measure of customization and flexibility, while reducing recurring software license costs. MATLAB and the open-source Orbit Determination Toolbox created by Goddard Space Flight Center (GSFC) were utilized to develop tools with the capability to propagate orbits, perform line-of-sight (LOS) availability analyses, and visualize the results. The developed programs are modular and can be applied for mission planning and viability analysis in a variety of Solar System applications. The tools can perform 2 and N-body orbit propagation, find inter-satellite and satellite to ground station LOS access (accounting for intermediate oblate spheroid body blocking, geometric restrictions of the antenna field-of-view (FOV), and relativistic corrections), and create animations of planetary movement, satellite orbits, and LOS accesses. The code is the basis for SCENICs broad analysis capabilities including dynamic link analysis, dilution-of-precision navigation analysis, and orbital availability calculations.
Comparison of four commercial devices for RapidArc and sliding window IMRT QA
Chandraraj, Varatharaj; Manickam, Ravikumar; Esquivel, Carlos; Supe, Sanjay S.; Papanikolaou, Nikos
2011-01-01
For intensity‐modulated radiation therapy, evaluation of the measured dose against the treatment planning calculated dose is essential in the context of patient‐specific quality assurance. The complexity of volumetric arc radiotherapy delivery attributed to its dynamic and synchronization nature require new methods and potentially new tools for the quality assurance of such techniques. In the present study, we evaluated and compared the dosimetric performance of EDR2 film and three other commercially available quality assurance devices: IBA I'MatriXX array, PTW Seven29 array and the Delta 4 array. The evaluation of these dosimetric systems was performed for RapidArc and IMRT deliveries using a Varian NovalisTX linear accelerator. The plans were generated using the Varian Eclipse treatment planning system. Our results showed that all four QA techniques yield equivalent results. All patient QAs passed our institutional clinical criteria of gamma index based on a 3% dose difference and 3 mm distance to agreement. In addition, the Bland‐Altman analysis was performed which showed that all the calculated gamma values of all three QA devices were within 5% from those of the film. The results showed that the four QA systems used in this patient‐specific IMRT QA analysis are equivalent. We concluded that the dosimetric systems under investigation can be used interchangeably for routine patient specific QA. PACS numbers: 87.55.Qr, 87.56.Fc
NASA Technical Reports Server (NTRS)
Decker, Deron R.
1991-01-01
Part of the role of the Mission Operations Lab is the development of budget inputs for Huntsville Operations/Payload Crew Training Center/Payload Operations Control Center (HOSC/PCTC/POCC) activity. These budget inputs are part of the formal Program Operating Plan (POP) process, which occurs twice yearly, and of the formal creation of the yearly operating plan. Both POPs and the operation plan serve the purpose of mapping out planned expenditures for the next fiscal year and for a number of outlying years. Based on these plans, the various Project Offices at the Center fund the HOSC/PCTC/POCC activity. Because of Mission Operations Lab's role in budget development, some of the Project Offices have begun looking to Mission Operations, and specifically the EO02 branch, to track expenditures and explain/justify any deviations from plans. EO02 has encountered difficulties acquiring the necessary information to perform this function. It appears that the necessary linkages with other units had not been fully developed and integrated with the flow of information in budget implementation. The purpose of this study is to document the budget process from the point of view of EO02 and to identify the steps necessary for it to effectively perform this role on a continuous basis.
ERIC Educational Resources Information Center
Windham, Patricia W.; Hackett, E. Raymond
In response to the increasing use of state-based performance indicators for postsecondary education, a study was undertaken to review the reliability and validity of state-level indicators in the Florida Community College System (FCCS). Data were collected from literature reviews and the 1996 FCCS Accountability Report, detailing outcomes for 17…
ERIC Educational Resources Information Center
Naglieri, Jack A.; Taddei, Stefano; Williams, Kevin M.
2013-01-01
This study examined Italian and U.S. children's performance on the English and Italian versions, respectively, of the Cognitive Assessment System (CAS; Naglieri & Conway, 2009; Naglieri & Das, 1997), a test based on a neurocognitive theory of intelligence entitled PASS (Planning, Attention, Simultaneous, and Successive; Naglieri & Das,…
Defensive Operations in a Decisive Action Training Environment
2017-07-01
the alpha reduced the likelihood of mistaking a false result for a true finding/effect. Control Versus Experimental Group Comparisons Chi...was made between control and experimental groups. The experimental group received a Guide for DO with the intent of improving performance on...Planning, Execution, and Overall performance. There were no significant differences between control and experimental groups. Further analysis revealed
A Varian DynaLog file-based procedure for patient dose-volume histogram-based IMRT QA.
Calvo-Ortega, Juan F; Teke, Tony; Moragues, Sandra; Pozo, Miquel; Casals-Farran, Joan
2014-03-06
In the present study, we describe a method based on the analysis of the dynamic MLC log files (DynaLog) generated by the controller of a Varian linear accelerator in order to perform patient-specific IMRT QA. The DynaLog files of a Varian Millennium MLC, recorded during an IMRT treatment, can be processed using a MATLAB-based code in order to generate the actual fluence for each beam and so recalculate the actual patient dose distribution using the Eclipse treatment planning system. The accuracy of the DynaLog-based dose reconstruction procedure was assessed by introducing ten intended errors to perturb the fluence of the beams of a reference plan such that ten subsequent erroneous plans were generated. In-phantom measurements with an ionization chamber (ion chamber) and planar dose measurements using an EPID system were performed to investigate the correlation between the measured dose changes and the expected ones detected by the reconstructed plans for the ten intended erroneous cases. Moreover, the method was applied to 20 cases of clinical plans for different locations (prostate, lung, breast, and head and neck). A dose-volume histogram (DVH) metric was used to evaluate the impact of the delivery errors in terms of dose to the patient. The ionometric measurements revealed a significant positive correlation (R² = 0.9993) between the variations of the dose induced in the erroneous plans with respect to the reference plan and the corresponding changes indicated by the DynaLog-based reconstructed plans. The EPID measurements showed that the accuracy of the DynaLog-based method to reconstruct the beam fluence was comparable with the dosimetric resolution of the portal dosimetry used in this work (3%/3 mm). The DynaLog-based reconstruction method described in this study is a suitable tool to perform a patient-specific IMRT QA. This method allows us to perform patient-specific IMRT QA by evaluating the result based on the DVH metric of the planning CT image (patient DVH-based IMRT QA).
A Cost and Performance System (CAPS) in a Federal agency
NASA Technical Reports Server (NTRS)
Huseonia, W. F.; Penton, P. G.
1994-01-01
Cost and Performance System (CAPS) is an automated system used from the planning phase through implementation to analysis and documentation. Data is retrievable or available for analysis of cost versus performance anomalies. CAPS provides a uniform system across intra- and international elements. A common system is recommended throughout an entire cost or profit center. Data can be easily accumulated and aggregated into higher levels of tracking and reporting of cost and performance.The level and quality of performance or productivity is indicated in the CAPS model and its process. The CAPS model provides the necessary decision information and insight to the principal investigator/project engineer for a successful project management experience. CAPS provides all levels of management with the appropriate detailed level of data.
NASA Technical Reports Server (NTRS)
Stokes, LeBarian
2009-01-01
This procedure establishes a system for performing testing in the Six-Degree-Of-Freedom Dynamic Test System (SDTS). Testing includes development and verification testing of customer supplied Test Articles (TAs) and other testing requirements, as requested. This procedure applies to all SDTS testing operations and equipment. The procedure provides an overview of testing performed in the SDTS including test identification requirements, test planning and procedure development, test and performance inspection, test data analysis, and test report generation.
Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2
DOE Office of Scientific and Technical Information (OSTI.GOV)
GRYGIEL, M.L.
1998-10-08
Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less
Temporal geospatial analysis of secondary school students’ examination performance
NASA Astrophysics Data System (ADS)
Nik Abd Kadir, ND; Adnan, NA
2016-06-01
Malaysia's Ministry of Education has improved the organization of the data to have the geographical information system (GIS) school database. However, no further analysis is done using geospatial analysis tool. Mapping has emerged as a communication tool and becomes effective way to publish the digital and statistical data such as school performance results. The objective of this study is to analyse secondary school student performance of science and mathematics scores of the Sijil Pelajaran Malaysia Examination result in the year 2010 to 2014 for the Kelantan's state schools with the aid of GIS software and geospatial analysis. The school performance according to school grade point average (GPA) from Grade A to Grade G were interpolated and mapped and query analysis using geospatial tools able to be done. This study will be beneficial to the education sector to analyse student performance not only in Kelantan but to the whole Malaysia and this will be a good method to publish in map towards better planning and decision making to prepare young Malaysians for the challenges of education system and performance.
[Analysis of the Burkinabe National Health Program for the Elderly (BNPEH) 2008-2012].
Berthé-Sanou, Lalla; Berthé, Abdramane; Drabo, Maxime; Badini-Kinda, Fatoumata; Somé, Mathias; Ouedraogo, Dieudonné; Macq, Jean
2013-01-01
As a result of ageing of the population, most countries of sub-Saharan Africa, either spontaneously and/or in response to international incentives, are starting to develop sectorial or multisectorial action plans in favour of the elderly. Are these plans relevant and consistent and do they improve the health of the elderly? This study was performed to assess the relevance, consistency and implementation of the National Health Programme for the Elderly (PNSPA) 2008-2012 in Burkina Faso. This qualitative analysis was conducted in Ouagadougou in November-December 2011 in 47 subjects including 27 elderly subjects and 20 stakeholders responsible for the design and/or implementation of the PNSPA. These respondents were selected rattionally and were individually interviewed. Content analysis was therefore performed. The PNSPA is relevant in the Burkinabe context. It takes into account the health needs of elderly people in Burkina Faso as well as the availability of resources in health centres. It presents several consistency problems. It has rarely been implemented due to lack of political support and inadequate financial resources. The Burkina Faso PNSPA has encountered more difficulties than similar plans in Senegal and Mali, which have also encountered low implementation rates. This situation confirms that the elderly in sub-Saharan Africa constitute a top priority vulnerable population but which is neglected by all actors to varying degrees.
Identifying the Factors That Facilitate or Hinder Advance Planning by Persons With Dementia
Hirschman, Karen B.; Kapo, Jennifer M.; Karlawish, Jason H. T.
2009-01-01
We performed semistructured interviews with 30 family members of patients with advanced dementia to identify the factors that facilitate or hinder advance planning by persons with dementia. All interviews were analyzed using qualitative data analysis techniques. The majority (77%) of family members reported that their relative had some form of written advance directive, and at least half reported previous discussions about health care preferences (57%), living situation or placement issues (50%), and finances or estate planning (60%) with the patient. Family members reported some themes that prompted planning and others that were barriers to planning. Events that most often triggered planning were medical, living situation, or financial issues associated with a friend or family member of the patient (57%). Barriers to planning included both passive and active avoidance. The most common form of passive avoidance was not realizing the importance of planning until it was too late to have the discussion (63%). The most common form of active avoidance was avoiding the discussion (53%). These data suggest potentially remediable strategies to address barriers to advance planning discussions. PMID:18580595
Lee, Soon Ok; Lee, Sang Yeoup; Baek, Sunyong; Woo, Jae Seok; Im, Sun Ju; Yune, So Jung; Lee, Sun Hee; Kam, Beesung
2015-06-01
We performed a two-and-a-half year follow-up study of strategy factors in successful learning to predict academic achievements in medical education. Strategy factors in successful learning were identified using a content analysis of open-ended responses from 30 medical students who were ranked in the top 10 of their class. Core words were selected among their responses in each category and the frequency of the words were counted. Then, a factors survey was conducted among year 2 students, before the second semester. Finally, we performed an analysis to assess the association between the factors score and academic achievement for the same students 2.5 years later. The core words were "planning and execution," "daily reviews" in the study schedule category; "focusing in class" and "taking notes" among class-related category; and "lecture notes," "previous exams or papers," and "textbooks" in the primary self-learning resources category. There were associations between the factors scores for study planning and execution, focusing in class, and taking notes and academic achievement, representing the second year second semester credit score, third year written exam scores and fourth year written and skill exam scores. Study planning was only one independent variable to predict fourth year summative written exam scores. In a two-and-a-half year follow-up study, associations were founded between academic achievement and the factors scores for study planning and execution, focusing in class, and taking notes. Study planning as only one independent variable is useful for predicting fourth year summative written exam score.
48 CFR 1252.216-72 - Performance evaluation plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance evaluation....216-72 Performance evaluation plan. As prescribed in (TAR) 48 CFR 1216.406(b), insert the following clause: Performance Evaluation Plan (OCT 1994) (a) A Performance Evaluation Plan shall be unilaterally...
NASA Technical Reports Server (NTRS)
1979-01-01
Recommendations for logistics activities and logistics planning are presented based on the assumption that a system prime contractor will perform logistics functions to support all program hardware and will implement a logistics system to include the planning and provision of products and services to assure cost effective coverage of the following: maintainability; maintenance; spares and supply support; fuels; pressurants and fluids; operations and maintenance documentation training; preservation, packaging and packing; transportation and handling; storage; and logistics management information reporting. The training courses, manpower, materials, and training aids required will be identified and implemented in a training program.
DOT National Transportation Integrated Search
1999-01-01
The Department of Transportation Performance Plan is a companion piece to the DOT Strategic Plan and to the DOT Fiscal Year 1999 Budget Request. The Performance Plan defines those performance indicators and goals that will be used to mark progress to...
Padgett, Kyle R; Stoyanova, Radka; Pirozzi, Sara; Johnson, Perry; Piper, Jon; Dogan, Nesrin; Pollack, Alan
2018-03-01
Validating deformable multimodality image registrations is challenging due to intrinsic differences in signal characteristics and their spatial intensity distributions. Evaluating multimodality registrations using these spatial intensity distributions is also complicated by the fact that these metrics are often employed in the registration optimization process. This work evaluates rigid and deformable image registrations of the prostate in between diagnostic-MRI and radiation treatment planning-CT by utilizing a planning-MRI after fiducial marker placement as a surrogate. The surrogate allows for the direct quantitative analysis that can be difficult in the multimodality domain. For thirteen prostate patients, T2 images were acquired at two different time points, the first several weeks prior to planning (diagnostic-MRI) and the second on the same day as the planning-CT (planning-MRI). The diagnostic-MRI was deformed to the planning-CT utilizing a commercially available algorithm which synthesizes a deformable image registration (DIR) algorithm from local rigid registrations. The planning-MRI provided an independent surrogate for the planning-CT for assessing registration accuracy using image similarity metrics, including Pearson correlation and normalized mutual information (NMI). A local analysis was performed by looking only within the prostate, proximal seminal vesicles, penile bulb, and combined areas. The planning-MRI provided an excellent surrogate for the planning-CT with residual error in fiducial alignment between the two datasets being submillimeter, 0.78 mm. DIR was superior to the rigid registration in 11 of 13 cases demonstrating a 27.37% improvement in NMI (P < 0.009) within a regional area surrounding the prostate and associated critical organs. Pearson correlations showed similar results, demonstrating a 13.02% improvement (P < 0.013). By utilizing the planning-MRI as a surrogate for the planning-CT, an independent evaluation of registration accuracy is possible. This population provides an ideal testing ground for MRI to CT DIR by obviating the need for multimodality comparisons which are inherently more challenging. © 2018 The Authors. Journal of Applied Clinical Medical Physics published by Wiley Periodicals, Inc. on behalf of American Association of Physicists in Medicine.
A case study for a digital seabed database: Bohai Sea engineering geology database
NASA Astrophysics Data System (ADS)
Tianyun, Su; Shikui, Zhai; Baohua, Liu; Ruicai, Liang; Yanpeng, Zheng; Yong, Wang
2006-07-01
This paper discusses the designing plan of ORACLE-based Bohai Sea engineering geology database structure from requisition analysis, conceptual structure analysis, logical structure analysis, physical structure analysis and security designing. In the study, we used the object-oriented Unified Modeling Language (UML) to model the conceptual structure of the database and used the powerful function of data management which the object-oriented and relational database ORACLE provides to organize and manage the storage space and improve its security performance. By this means, the database can provide rapid and highly effective performance in data storage, maintenance and query to satisfy the application requisition of the Bohai Sea Oilfield Paradigm Area Information System.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, X; Wang, J; Hu, W
Purpose: The Varian RapidPlan™ is a commercial knowledge-based optimization process which uses a set of clinically used treatment plans to train a model that can predict individualized dose-volume objectives. The purpose of this study is to evaluate the performance of RapidPlan to generate intensity modulated radiation therapy (IMRT) plans for cervical cancer. Methods: Totally 70 IMRT plans for cervical cancer with varying clinical and physiological indications were enrolled in this study. These patients were all previously treated in our institution. There were two prescription levels usually used in our institution: 45Gy/25 fractions and 50.4Gy/28 fractions. 50 of these plans weremore » selected to train the RapidPlan model for predicting dose-volume constraints. After model training, this model was validated with 10 plans from training pool(internal validation) and additional other 20 new plans(external validation). All plans used for the validation were re-optimized with the original beam configuration and the generated priorities from RapidPlan were manually adjusted to ensure that re-optimized DVH located in the range of the model prediction. DVH quantitative analysis was performed to compare the RapidPlan generated and the original manual optimized plans. Results: For all the validation cases, RapidPlan based plans (RapidPlan) showed similar or superior results compared to the manual optimized ones. RapidPlan increased the result of D98% and homogeneity in both two validations. For organs at risk, the RapidPlan decreased mean doses of bladder by 1.25Gy/1.13Gy (internal/external validation) on average, with p=0.12/p<0.01. The mean dose of rectum and bowel were also decreased by an average of 2.64Gy/0.83Gy and 0.66Gy/1.05Gy,with p<0.01/ p<0.01and p=0.04/<0.01 for the internal/external validation, respectively. Conclusion: The RapidPlan model based cervical cancer plans shows ability to systematically improve the IMRT plan quality. It suggests that RapidPlan has great potential to make the treatment planning process more efficient.« less
Texas flexible pavements and overlays : data analysis plans and reporting format.
DOT National Transportation Integrated Search
2012-01-01
This five-year project was initiated to collect materials and pavement performance data on a minimum of 100 : highway test sections around the State of Texas, incorporating flexible pavements and overlays. Besides being used to : calibrate and valida...
Maintenance Plan for the Composite Analysis of the Hanford Site, Southeast Washington.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lehman, L. L.; Nichols, W. E.
The U.S. Department of Energy (DOE) manuals for radioactive waste management, DOE M 435.1-1 Chg 21 and DOE-STD-5002-2017, require that the Hanford Site maintain site performance assessments and composite analyses (CAs). This document describes the plan for maintaining the CA that supports waste disposal and remedial actions for the Hanford Site. An initial CA of the site was issued in 1998, conditionally approved in 1999, received further analysis to satisfy conditions in an addendum in 2001, and was approved in 2002. This document meets the maintenance plan requirements described in DOE M 435.1-1 Chg 2 and DOE-STD-5002-2017 and implements themore » requirements of the disposal authorization related to the CA for the U.S. Department of Energy, Richland Operations Office, the responsible field office, and its contractors.« less
Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies
NASA Technical Reports Server (NTRS)
Van Cise, Edward A.; Kelly, Brian J.; Radigan, Jeffery P.; Cranmer, Curtis W.
2016-01-01
Initial "Big 14" work was put to the test for the first time in 2010. Deficiencies were found in some of the planning and approaches to that work; Failure Response Assessment Team created in 2010 to address deficiencies -Identify and perform engineering analysis in operations products prior to failure; incorporate results into operations products -Identify actions for protecting ISS against a Next Worse Failure after the first failure occurs -Better document not only EVA products but also planning products, assumptions, and open actions; Pre-failure investments against critical failures best postures ISS for swift response and recovery -A type of insurance policy -Has proven effective in a number of contingency EVA cases since 2010. Planning for MBSU R&R in 2012, Second PM R&R in 2013, EXT MDM R&R in 2014; Current FRAT schedule projects completion of all analysis in 2018
NASA Technical Reports Server (NTRS)
Soffen, Gerald A. (Editor)
1987-01-01
The present conference on U.S. space transportation systems development discusses opportunities for aerospace students in prospective military, civil, industrial, and scientific programs, current strategic conceptualization and program planning for future U.S. space transportation, the DOD space transportation plan, NASA space transportation plans, medium launch vehicle and commercial space launch services, the capabilities and availability of foreign launch vehicles, and the role of commercial space launch systems. Also discussed are available upper stage systems, future space transportation needs for space science and applications, the trajectory analysis of a low lift/drag-aeroassisted orbit transfer vehicle, possible replacements for the Space Shuttle, LEO to GEO with combined electric/beamed-microwave power from earth, the National Aerospace Plane, laser propulsion to earth orbit, and a performance analysis for a laser-powered SSTO vehicle.
EP-DRAFT-1.1 2014-01-19 OSI-GAM-SOP-00x In Situ High-resolution Gamma Spectroscopy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wimer, N. G.; Kreek, S. A.
2014-01-27
The standard operating procedure is described for in situ high-resolution gamma spectroscopy, including operational readiness, planning, preparation, conduct, and reporting. Data analysis of in situ gamma spectrum files will be performed together with those of other gamma assay methods by a dedicated Data Analysis process, documented in companion OSI procedures.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1978-03-22
A grid-connected Integrated Community Energy System (ICES) with a coal-burning power plant located on the University of Minnesota campus is planned. The cost benefit analysis performed for this ICES, the cost accounting methods used, and a computer simulation of the operation of the power plant are described. (LCL)
Apollo/Skylab suit program management systems study. Volume 2: Cost analysis
NASA Technical Reports Server (NTRS)
1974-01-01
The business management methods employed in the performance of the Apollo-Skylab Suit Program are studied. The data accumulated over the span of the contract as well as the methods used to accumulate the data are examined. Management methods associated with the monitoring and control of resources applied towards the performance of the contract are also studied and recommended upon. The primary objective is the compilation, analysis, and presentation of historical cost performance criteria. Cost data are depicted for all phases of the Apollo-Skylab program in common, meaningful terms, whereby the data may be applicable to future suit program planning efforts.
Generic Degraded Congiguration Probability Analysis for DOE Codisposal Waste Package
DOE Office of Scientific and Technical Information (OSTI.GOV)
S.F.A. Deng; M. Saglam; L.J. Gratton
2001-05-23
In accordance with the technical work plan, ''Technical Work Plan For: Department of Energy Spent Nuclear Fuel Work Packages'' (CRWMS M&O 2000c), this Analysis/Model Report (AMR) is developed for the purpose of screening out degraded configurations for U.S. Department of Energy (DOE) spent nuclear fuel (SNF) types. It performs the degraded configuration parameter and probability evaluations of the overall methodology specified in the ''Disposal Criticality Analysis Methodology Topical Report'' (YMP 2000, Section 3) to qualifying configurations. Degradation analyses are performed to assess realizable parameter ranges and physical regimes for configurations. Probability calculations are then performed for configurations characterized by k{submore » eff} in excess of the Critical Limit (CL). The scope of this document is to develop a generic set of screening criteria or models to screen out degraded configurations having potential for exceeding a criticality limit. The developed screening criteria include arguments based on physical/chemical processes and probability calculations and apply to DOE SNF types when codisposed with the high-level waste (HLW) glass inside a waste package. The degradation takes place inside the waste package and is long after repository licensing has expired. The emphasis of this AMR is on degraded configuration screening and the probability analysis is one of the approaches used for screening. The intended use of the model is to apply the developed screening criteria to each DOE SNF type following the completion of the degraded mode criticality analysis internal to the waste package.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elvado Environmental LLC for the Environmental Compliance Department ES&H Division, Y-12 National Security Complex Oak Ridge, Tennessee
2003-09-30
This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2004 at the U.S. Department of Energy (DOE) Y-12 National Security Complex that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2004 will be in accordance with the following requirements of DOE Order 5400.1: (1) to maintain surveillance of existing and potential groundwater contamination sources; (2) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminants are mostmore » likely to migrate beyond the Oak Ridge Reservation property line; (3) to identify and characterize long-term trends in groundwater quality at Y-12; and (4) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2004 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation (Figure A.1). Modifications to the CY 2004 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells, or wells could be added or removed from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2004-09-30
This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2005 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2005 will be in accordance with DOE Order 540.1 requirements and the following goals: (1) to maintain surveillance of existing and potential groundwater contamination sources; (2) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminantsmore » are most likely to migrate beyond the Oak Ridge Reservation property line; (3) to identify and characterize long-term trends in groundwater quality at Y-12; and (4) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2005 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation (Figure A.1). Modifications to the CY 2005 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan.« less
SU-E-T-184: Clinical VMAT QA Practice Using LINAC Delivery Log Files
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnston, H; Jacobson, T; Gu, X
2015-06-15
Purpose: To evaluate the accuracy of volumetric modulated arc therapy (VMAT) treatment delivery dose clouds by comparing linac log data to doses measured using an ionization chamber and film. Methods: A commercial IMRT quality assurance (QA) process utilizing a DICOM-RT framework was tested for clinical practice using 30 prostate and 30 head and neck VMAT plans. Delivered 3D VMAT dose distributions were independently checked using a PinPoint ionization chamber and radiographic film in a solid water phantom. DICOM RT coordinates were used to extract the corresponding point and planar doses from 3D log file dose distributions. Point doses were evaluatedmore » by computing the percent error between log file and chamber measured values. A planar dose evaluation was performed for each plan using a 2D gamma analysis with 3% global dose difference and 3 mm isodose point distance criteria. The same analysis was performed to compare treatment planning system (TPS) doses to measured values to establish a baseline assessment of agreement. Results: The mean percent error between log file and ionization chamber dose was 1.0%±2.1% for prostate VMAT plans and −0.2%±1.4% for head and neck plans. The corresponding TPS calculated and measured ionization chamber values agree within 1.7%±1.6%. The average 2D gamma passing rates for the log file comparison to film are 98.8%±1.0% and 96.2%±4.2% for the prostate and head and neck plans, respectively. The corresponding passing rates for the TPS comparison to film are 99.4%±0.5% and 93.9%±5.1%. Overall, the point dose and film data indicate that log file determined doses are in excellent agreement with measured values. Conclusion: Clinical VMAT QA practice using LINAC treatment log files is a fast and reliable method for patient-specific plan evaluation.« less
Strategic planning by independent community pharmacies.
Harrison, Donald L
2005-01-01
(1) To assess the degree and level of use of the strategic planning process (none, partly, fully) by independent community pharmacy owners/managers and (2) to evaluate the relationships between independent community pharmacy owners/managers' level of strategic planning and indicators of pharmacy performance; including new and refill prescriptions filled, gross margin, rated patient care performance, rated dispensing performance, rated non-pharmacy performance, and rated financial performance. Cross-sectional study. United States. Nationwide random sample of 1,250 owners/managers of independent community pharmacies. Mailed survey. Quality of strategic planning conducted; pharmacy performance measures. Only 141 of 527 (26.8%) usable responses indicated use of some (77 pharmacies, 54.6%) or all (64 pharmacies, 45.4%) of the seven steps typical of strategic planning. Significant associations were observed between the level of strategic planning use and all pharmacy performance variables assessed, including indicators such as greater numbers of new and refill prescriptions dispensed, gross margins, patient care performance, dispensing performance, non-pharmacy performance, and financial performance. Greater ratings of pharmacy performance were significantly associated with the level of strategic planning use. Respondents who fully used strategic planning had significantly higher indicators than partial users; respondents who partly used the process had significantly higher ratings than respondents who did not conduct strategic planning.
NASA Supportability Engineering Implementation Utilizing DoD Practices and Processes
NASA Technical Reports Server (NTRS)
Smith, David A.; Smith, John V.
2010-01-01
The Ares I design and development program made the determination early in the System Design Review Phase to utilize DoD ILS and LSA approach for supportability engineering as an integral part of the system engineering process. This paper is to provide a review of the overall approach to design Ares-I with an emphasis on a more affordable, supportable, and sustainable launch vehicle. Discussions will include the requirements development, design influence, support concept alternatives, ILS and LSA planning, Logistics support analyses/trades performed, LSA tailoring for NASA Ares Program, support system infrastructure identification, ILS Design Review documentation, Working Group coordination, and overall ILS implementation. At the outset, the Ares I Project initiated the development of the Integrated Logistics Support Plan (ILSP) and a Logistics Support Analysis process to provide a path forward for the management of the Ares-I ILS program and supportability analysis activities. The ILSP provide the initial planning and coordination between the Ares-I Project Elements and Ground Operation Project. The LSA process provided a system engineering approach in the development of the Ares-I supportability requirements; influence the design for supportability and development of alternative support concepts that satisfies the program operability requirements. The LSA planning and analysis results are documented in the Logistics Support Analysis Report. This document was required during the Ares-I System Design Review (SDR) and Preliminary Design Review (PDR) review cycles. To help coordinate the LSA process across the Ares-I project and between programs, the LSA Report is updated and released quarterly. A System Requirement Analysis was performed to determine the supportability requirements and technical performance measurements (TPMs). Two working groups were established to provide support in the management and implement the Ares-I ILS program, the Integrated Logistics Support Working Group (ILSWG) and the Logistics Support Analysis Record Working Group (LSARWG). The Ares I ILSWG is established to assess the requirements and conduct, evaluate analyses and trade studies associated with acquisition logistic and supportability processes and to resolve Ares I integrated logistics and supportability issues. It established a strategic collaborative alliance for coordination of Logistics Support Analysis activates in support of the integrated Ares I vehicle design and development of logistics support infrastructure. A Joint Ares I - Orion LSAR Working Group was established to: 1) Guide the development of Ares-I and Orion LSAR data and serve as a model for future Constellation programs, 2) Develop rules and assumptions that will apply across the Constellation program with regards to the program's LSAR development, and 3) Maintain the Constellation LSAR Style Guide.
NASA Technical Reports Server (NTRS)
1976-01-01
A software analysis was performed of known STS sortie payload elements and their associated experiments. This provided basic data for STS payload software characteristics and sizes. A set of technology drivers was identified based on a survey of future technology needs and an assessment of current software technology. The results will be used to evolve a planned approach to software technology development. The purpose of this plan is to ensure that software technology is advanced at a pace and a depth sufficient to fulfill the identified future needs.
Missile and Space Systems Reliability versus Cost Trade-Off Study
1983-01-01
F00-1C09 Robert C. Schneider F00-1C09 V . PERFORMING ORGANIZATION NAME AM0 ADDRESS 16 PRGRAM ELEMENT. PROJECT. TASK BoeingAerosace CmpAnyA CA WORK UNIT...reliability problems, which has the - real bearing on program effectiveness. A well planned and funded reliability effort can prevent or ferret out...failure analysis, and the in- corporation and verification of design corrections to prevent recurrence of failures. 302.2.2 A TMJ test plan shall be
2002-03-01
land lease agreement? 9. What are the emerging business plans for the proposed land lease agreement? 10. What are the primary strategic issues...How does the proposed land lease agreement “fit” with the stated strategic plan of NPS and the City of Monterey, i.e., relevance of missions(s) to...functions rather than in-house personnel. Outsourcing strategically uses outside providers to perform functions traditionally handled by internal
Model surgery with a passive robot arm for orthognathic surgery planning.
Theodossy, Tamer; Bamber, Mohammad Anwar
2003-11-01
The aims of the study were to assess the degree of accuracy of model surgery performed manually using the Eastman technique and to compare it with model surgery performed with the aid of a robot arm. Twenty-one patients undergoing orthognathic surgery gave consent for this study. They were divided into 2 groups based on the model surgery technique used. Group A (52%) had model surgery performed manually, whereas group B (48%) had their model surgery performed using the robot arm. Patients' maxillary casts were measured before and after model surgery, and results were compared with those for the original treatment plan in horizontal (x-axis), vertical (y-axis), and transverse (z-axis) planes. Statistical analysis using Mann-Whitney U test for x- and y-axis and independent sample t test for z-axis have shown significant differences between both groups in x-axis (P =.024) and y-axis (P =.01) but not in z-axis (P =.776). Model surgery performed with the aid of a robot arm is significantly more accurate in anteroposterior and vertical planes than is manual model surgery. Robot arm has an important role to play in orthognathic surgery planning and in determining the biometrics of orthognathic surgical change at the model surgery stage.
NASA Astrophysics Data System (ADS)
Zhang, T. H.; Ji, H. W.; Hu, Y.; Ye, Q.; Lin, Y.
2018-04-01
Remote Sensing (RS) and Geography Information System (GIS) technologies are widely used in ecological analysis and regional planning. With the advantages of large scale monitoring, combination of point and area, multiple time-phases and repeated observation, they are suitable for monitoring and analysis of environmental information in a large range. In this study, support vector machine (SVM) classification algorithm is used to monitor the land use and land cover change (LUCC), and then to perform the ecological evaluation for Chaohu lake tourism area quantitatively. The automatic classification and the quantitative spatial-temporal analysis for the Chaohu Lake basin are realized by the analysis of multi-temporal and multispectral satellite images, DEM data and slope information data. Furthermore, the ecological buffer zone analysis is also studied to set up the buffer width for each catchment area surrounding Chaohu Lake. The results of LUCC monitoring from 1992 to 2015 has shown obvious affections by human activities. Since the construction of the Chaohu Lake basin is in the crucial stage of the rapid development of urbanization, the application of RS and GIS technique can effectively provide scientific basis for land use planning, ecological management, environmental protection and tourism resources development in the Chaohu Lake Basin.
Ho, Cheng-Ting; Lin, Hsiu-Hsia; Liou, Eric J. W.; Lo, Lun-Jou
2017-01-01
Traditional planning method for orthognathic surgery has limitations of cephalometric analysis, especially for patients with asymmetry. The aim of this study was to assess surgical plan modification after 3-demensional (3D) simulation. The procedures were to perform traditional surgical planning, construction of 3D model for the initial surgical plan (P1), 3D model of altered surgical plan after simulation (P2), comparison between P1 and P2 models, surgical execution, and postoperative validation using superimposition and root-mean-square difference (RMSD) between postoperative 3D image and P2 simulation model. Surgical plan was modified after 3D simulation in 93% of the cases. Absolute linear changes of landmarks in mediolateral direction (x-axis) were significant and between 1.11 to 1.62 mm. The pitch, yaw, and roll rotation as well as ramus inclination correction also showed significant changes after the 3D planning. Yaw rotation of the maxillomandibular complex (1.88 ± 0.32°) and change of ramus inclination (3.37 ± 3.21°) were most frequently performed for correction of the facial asymmetry. Errors between the postsurgical image and 3D simulation were acceptable, with RMSD 0.63 ± 0.25 mm for the maxilla and 0.85 ± 0.41 mm for the mandible. The information from this study could be used to augment the clinical planning and surgical execution when a conventional approach is applied. PMID:28071714
DOE Office of Scientific and Technical Information (OSTI.GOV)
Faydide, B.
1997-07-01
This paper presents the current and planned numerical development for improving computing performance in case of Cathare applications needing real time, like simulator applications. Cathare is a thermalhydraulic code developed by CEA (DRN), IPSN, EDF and FRAMATOME for PWR safety analysis. First, the general characteristics of the code are presented, dealing with physical models, numerical topics, and validation strategy. Then, the current and planned applications of Cathare in the field of simulators are discussed. Some of these applications were made in the past, using a simplified and fast-running version of Cathare (Cathare-Simu); the status of the numerical improvements obtained withmore » Cathare-Simu is presented. The planned developments concern mainly the Simulator Cathare Release (SCAR) project which deals with the use of the most recent version of Cathare inside simulators. In this frame, the numerical developments are related with the speed up of the calculation process, using parallel processing and improvement of code reliability on a large set of NPP transients.« less
Earth resources data analysis program, phase 3
NASA Technical Reports Server (NTRS)
1975-01-01
Tasks were performed in two areas: (1) systems analysis and (2) algorithmic development. The major effort in the systems analysis task was the development of a recommended approach to the monitoring of resource utilization data for the Large Area Crop Inventory Experiment (LACIE). Other efforts included participation in various studies concerning the LACIE Project Plan, the utility of the GE Image 100, and the specifications for a special purpose processor to be used in the LACIE. In the second task, the major effort was the development of improved algorithms for estimating proportions of unclassified remotely sensed data. Also, work was performed on optimal feature extraction and optimal feature extraction for proportion estimation.
NASA Technical Reports Server (NTRS)
Greenberg, H. S.
1994-01-01
This document is the detailed test plan for the series of tests enumerated in the preceding section. The purpose of this plan is to present the test objectives, test parameters and procedures, expected performance and data analysis plans, criteria for success, test schedules, and related safety provisions and to describe the test articles, test instrumentation, and test facility requirements. Initial testing will be performed to screen four composite materials for suitability for SSTO LH2 tank loads and environmental conditions. The laminates for this testing will be fabricated by fiber placement, which is the manufacturing approach identified as baseline for the tank wall. Even though hand layup will be involved in fabricating many of the internal structural members of the tank, no hand-layup laminates will be evaluated in the screening or subsequent characterization testing. This decision is based on the understanding that mechanical properties measured for hand-layup material should be at least equivalent to properties measured for fiber-placed material, so that the latter should provide no less than a conservative approximation of the former. A single material will be downselected from these screening tests. This material will be subsequently characterized for impact-damage tolerance and durability under conditions of mechanical and thermal cycling, and to establish a preliminary design database to support ongoing analysis. Next, testing will be performed on critical structural elements fabricated from the selected material. Finally, the 8-foot diameter tank article, containing the critical structural features of the full-scale tank, will be fabricated by fiber placement and tested to verify its structural integrity and LH2 containment.
Executive Dysfunction Among Children With Reading Comprehension Deficits
Locascio, Gianna; Mahone, E. Mark; Eason, Sarah H.; Cutting, Laurie E.
2010-01-01
Emerging research supports the contribution of executive function (EF) to reading comprehension; however, a unique pattern has not been established for children who demonstrate comprehension difficulties despite average word recognition ability (specific reading comprehension deficit; S-RCD). To identify particular EF components on which children with S-RCD struggle, a range of EF skills was compared among 86 children, ages 10 to 14, grouped by word reading and comprehension abilities: 24 average readers, 44 with word recognition deficits (WRD), and 18 S-RCD. An exploratory principal components analysis of EF tests identified three latent factors, used in subsequent group comparisons: Planning/Spatial Working Memory, Verbal Working Memory, and Response Inhibition. The WRD group exhibited deficits (relative to controls) on Verbal Working Memory and Inhibition factors; S-RCD children performed more poorly than controls on the Planning factor. Further analyses suggested the WRD group’s poor performance on EF factors was a by-product of core deficits linked to WRD (after controlling for phonological processing, this group no longer showed EF deficits). In contrast, the S-RCD group’s poor performance on the planning component remained significant after controlling for phonological processing. Findings suggest reading comprehension difficulties are linked to executive dysfunction; in particular, poor strategic planning/organizing may lead to reading comprehension problems. PMID:20375294
Executive dysfunction among children with reading comprehension deficits.
Locascio, Gianna; Mahone, E Mark; Eason, Sarah H; Cutting, Laurie E
2010-01-01
Emerging research supports the contribution of executive function (EF) to reading comprehension; however, a unique pattern has not been established for children who demonstrate comprehension difficulties despite average word recognition ability (specific reading comprehension deficit; S-RCD). To identify particular EF components on which children with S-RCD struggle, a range of EF skills was compared among 86 children, ages 10 to 14, grouped by word reading and comprehension abilities: 24 average readers, 44 with word recognition deficits (WRD), and 18 S-RCD. An exploratory principal components analysis of EF tests identified three latent factors, used in subsequent group comparisons: Planning/ Spatial Working Memory, Verbal Working Memory, and Response Inhibition. The WRD group exhibited deficits (relative to controls) on Verbal Working Memory and Inhibition factors; S-RCD children performed more poorly than controls on the Planning factor. Further analyses suggested the WRD group's poor performance on EF factors was a by-product of core deficits linked to WRD (after controlling for phonological processing, this group no longer showed EF deficits). In contrast, the S-RCD group's poor performance on the planning component remained significant after controlling for phonological processing. Findings suggest reading comprehension difficulties are linked to executive dysfunction; in particular, poor strategic planning/organizing may lead to reading comprehension problems.
DOE Office of Scientific and Technical Information (OSTI.GOV)
STEEN, F.H.
This document is the format IV, final report for the tank 241-S-111 (S-111) grab samples taken in August 1999 to address waste compatibility concerns. Chemical, radiochemical, and physical analyses on the tank S-111 samples were performed as directed in Compatibility Grab Sampling and Analysis Plan for Fiscal Year 1999 (Sasaki 1999a,b). Any deviations from the instructions provided in the tank sampling and analysis plan (TSAP) were discussed in this narrative. The notification limit for {sup 137}Cs was exceeded on two samples. Results are discussed in Section 5.3.2. No other notification limits were exceeded.
Longitudinal Analysis of Music Education on Executive Functions in Primary School Children
Jaschke, Artur C.; Honing, Henkjan; Scherder, Erik J. A.
2018-01-01
Background: Research on the effects of music education on cognitive abilities has generated increasing interest across the scientific community. Nonetheless, longitudinal studies investigating the effects of structured music education on cognitive sub-functions are still rare. Prime candidates for investigating a relationship between academic achievement and music education appear to be executive functions such as planning, working memory, and inhibition. Methods: One hundred and forty-seven primary school children, Mage = 6.4 years, SD = 0.65 were followed for 2.5 years. Participants were randomized into four groups: two music intervention groups, one active visual arts group, and a no arts control group. Neuropsychological tests assessed verbal intelligence and executive functions. Additionally, a national pupil monitor provided data on academic performance. Results: Children in the visual arts group perform better on visuospatial memory tasks as compared to the three other conditions. However, the test scores on inhibition, planning and verbal intelligence increased significantly in the two music groups over time as compared to the visual art and no arts controls. Mediation analysis with executive functions and verbal IQ as mediator for academic performance have shown a possible far transfer effect from executive sub-function to academic performance scores. Discussion: The present results indicate a positive influence of long-term music education on cognitive abilities such as inhibition and planning. Of note, following a two-and-a-half year long visual arts program significantly improves scores on a visuospatial memory task. All results combined, this study supports a far transfer effect from music education to academic achievement mediated by executive sub-functions. PMID:29541017
Longitudinal Analysis of Music Education on Executive Functions in Primary School Children.
Jaschke, Artur C; Honing, Henkjan; Scherder, Erik J A
2018-01-01
Background: Research on the effects of music education on cognitive abilities has generated increasing interest across the scientific community. Nonetheless, longitudinal studies investigating the effects of structured music education on cognitive sub-functions are still rare. Prime candidates for investigating a relationship between academic achievement and music education appear to be executive functions such as planning, working memory, and inhibition. Methods: One hundred and forty-seven primary school children, M age = 6.4 years, SD = 0.65 were followed for 2.5 years. Participants were randomized into four groups: two music intervention groups, one active visual arts group, and a no arts control group. Neuropsychological tests assessed verbal intelligence and executive functions. Additionally, a national pupil monitor provided data on academic performance. Results: Children in the visual arts group perform better on visuospatial memory tasks as compared to the three other conditions. However, the test scores on inhibition, planning and verbal intelligence increased significantly in the two music groups over time as compared to the visual art and no arts controls. Mediation analysis with executive functions and verbal IQ as mediator for academic performance have shown a possible far transfer effect from executive sub-function to academic performance scores. Discussion: The present results indicate a positive influence of long-term music education on cognitive abilities such as inhibition and planning. Of note, following a two-and-a-half year long visual arts program significantly improves scores on a visuospatial memory task. All results combined, this study supports a far transfer effect from music education to academic achievement mediated by executive sub-functions.
Simultaneous integrated vs. sequential boost in VMAT radiotherapy of high-grade gliomas.
Farzin, Mostafa; Molls, Michael; Astner, Sabrina; Rondak, Ina-Christine; Oechsner, Markus
2015-12-01
In 20 patients with high-grade gliomas, we compared two methods of planning for volumetric-modulated arc therapy (VMAT): simultaneous integrated boost (SIB) vs. sequential boost (SEB). The investigation focused on the analysis of dose distributions in the target volumes and the organs at risk (OARs). After contouring the target volumes [planning target volumes (PTVs) and boost volumes (BVs)] and OARs, SIB planning and SEB planning were performed. The SEB method consisted of two plans: in the first plan the PTV received 50 Gy in 25 fractions with a 2-Gy dose per fraction. In the second plan the BV received 10 Gy in 5 fractions with a dose per fraction of 2 Gy. The doses of both plans were summed up to show the total doses delivered. In the SIB method the PTV received 54 Gy in 30 fractions with a dose per fraction of 1.8 Gy, while the BV received 60 Gy in the same fraction number but with a dose per fraction of 2 Gy. All of the OARs showed higher doses (Dmax and Dmean) in the SEB method when compared with the SIB technique. The differences between the two methods were statistically significant in almost all of the OARs. Analysing the total doses of the target volumes we found dose distributions with similar homogeneities and comparable total doses. Our analysis shows that the SIB method offers advantages over the SEB method in terms of sparing OARs.
7 CFR 1781.15 - Planning and performing development.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 12 2010-01-01 2010-01-01 false Planning and performing development. 1781.15 Section..., DEPARTMENT OF AGRICULTURE (CONTINUED) RESOURCE CONSERVATION AND DEVELOPMENT (RCD) LOANS AND WATERSHED (WS) LOANS AND ADVANCES § 1781.15 Planning and performing development. Planning and performing development...
7 CFR 1781.15 - Planning and performing development.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 12 2011-01-01 2011-01-01 false Planning and performing development. 1781.15 Section..., DEPARTMENT OF AGRICULTURE (CONTINUED) RESOURCE CONSERVATION AND DEVELOPMENT (RCD) LOANS AND WATERSHED (WS) LOANS AND ADVANCES § 1781.15 Planning and performing development. Planning and performing development...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Germain, Francois; Beaulieu, Luc; Fortin, Andre
2008-04-01
In conformal radiotherapy planning for lung cancer, respiratory movements are not taken into account when a single computed tomography (CT) scan is performed. This study examines tumor movements to design individualized margins to account for these movements and evaluates their dosimetric impacts on planning volume. Fifteen patients undergoing CT-based planning for radical radiotherapy for localized lung cancer formed the study cohort. A reference plan was constructed based on reference gross, clinical, and planning target volumes (rGTV, rCTV, and rPTV, respectively). The reference plans were compared with individualized plans using individualized margins obtained by using 5 serial CT scans to generatemore » individualized target volumes (iGTV, iCTV, and iPTV). Three-dimensional conformal radiation therapy was used for plan generation using 6- and 23-MV photon beams. Ten plans for each patient were generated and dose-volume histograms (DVHs) were calculated. Comparisons of volumetric and dosimetric parameters were performed using paired Student t-tests. Relative to the rGTV, the total volume occupied by the superimposed GTVs increased progressively with each additional CT scans. With the use of all 5 scans, the average increase in GTV was 52.1%. For the plans with closest dosimetric coverage, target volume was smaller (iPTV/rPTV ratio 0.808) but lung irradiation was only slightly decreased. Reduction in the proportion of lung tissue that received 20 Gy or more outside the PTV (V20) was observed both for 6-MV plans (-0.73%) and 23-MV plans (-0.65%), with p = 0.02 and p = 0.04, respectively. In conformal RT planning for the treatment of lung cancer, the use of serial CT scans to evaluate respiratory motion and to generate individualized margins to account for these motions produced only a limited lung sparing advantage.« less
Development of Instructor Support Feature Guidelines. Volume 1.
1986-05-01
dated) Flight Objectives Pamphlet (8/84) TAC Syllabus (8/84) Gradesheet B-52 Training Program WST Coursebook (not dated) Console Familiarization Course...Wordstar Lesson Plans (1984) Gradesheets Instructor Handbook (3/82) KC-135 Pilot WST Coursebook (1/84) Navigator WST Coursebook (1/84) 2 T-37 Instrument...time aircrew performance measurement and instructor feedback, and post-mission data retrieval and analysis. Various levels of statistical performance
Policy Perspective: Meeting the Challenge of the DOE Order 436.1 Departmental Sustainability - 12527
DOE Office of Scientific and Technical Information (OSTI.GOV)
MacDonald, Jennifer C.
2012-07-01
DOE's Sustainability Performance Office is working to meet sustainability goals at DOE by implementing Executive Orders, Departmental policy, the DOE Strategic Sustainability Performance Plan (SSPP) and legislation related to sustainability. Through implementation of Executive Orders, Departmental policy, the SSPP, statutory requirements and regular reporting, analysis and communication, DOE's SPO is working to maintain and expand DOE's leadership in sustainability. (authors)
Hughes, Christine A; Breault, Rene R; Hicks, Deborah; Schindel, Theresa J
2017-11-23
A comprehensive Compensation Plan for pharmacy services delivered by community pharmacists was implemented in Alberta, Canada in July 2012. Services covered by the Compensation Plan include care planning services, prescribing services such as adapting prescriptions, and administering a drug or publicly-funded vaccine by injection. Understanding how the Compensation Plan was framed and communicated provides insight into the roles of pharmacists and the potential influence of language on the implementation of services covered by the Compensation Plan by Albertan pharmacists. The objective of this study is to examine the positioning of pharmacists' roles in documents used to communicate the Compensation Plan to Albertan pharmacists and other audiences. Publicly available documents related to the Compensation Plan, such as news releases or reports, published between January 2012 and December 2015 were obtained from websites such as the Government of Alberta, Alberta Blue Cross, the Alberta College of Pharmacists, the Alberta Pharmacists' Association, and the Blueprint for Pharmacy. Searches of the Canadian Newsstand database and Google identified additional documents. Discourse analysis was performed using social positioning theory to explore how pharmacists' roles were constructed in communications about the Compensation Plan. In total, 65 publicly available documents were included in the analysis. The Compensation Plan was put forward as a framework for payment for professional services and formal legitimization of pharmacists' changing professional roles. The discourse associated with the Compensation Plan positioned pharmacists' roles as: (1) expanding to include services such as medication management for chronic diseases, (2) contributing to primary health care by providing access to services such as prescription renewals and immunizations, and (3) collaborating with other health care team members. Pharmacists' changing roles were positioned in alignment with the aims of primary health care. Social positioning theory provides a useful lens to examine the dynamic and evolving roles of pharmacists. This study provides insight into how communications regarding the Compensation Plan in Alberta, Canada positioned pharmacists' changing roles in the broader context of changes to primary health care delivery. Our findings may be useful for other jurisdictions considering implementation of remunerated clinical services provided by pharmacists.
2011-01-01
Background Despite large-scale investments in mental health care in the community since the 1990 s, a trend towards reinstitutionalization has been visible since 2002. Since many mental health care providers regard this as an undesirable trend, the question arises: In the coming 5 years, what types of residence should be organized for people with mental health problems? The purpose of this article is to provide mental health care providers, public housing corporations, and local government with guidelines for planning organizational strategy concerning types of residence for people with mental health problems. Methods A scenario analysis was performed in four steps: 1) an exploration of the external environment; 2) the identification of key uncertainties; 3) the development of scenarios; 4) the translation of scenarios into guidelines for planning organizational strategy. To explore the external environment a document study was performed, and 15 semi-structured interviews were conducted. During a workshop, a panel of experts identified two key uncertainties in the external environment, and formulated four scenarios. Results The study resulted in four scenarios: 1) Integrated and independent living in the community with professional care; 2) Responsible healthcare supported by society; 3) Differentiated provision within the walls of the institution; 4) Residence in large-scale institutions but unmet need for care. From the range of aspects within the different scenarios, the panel was able to work out concrete guidelines for planning organizational strategy. Conclusions In the context of residence for people with mental health problems, the focus should be on investment in community care and their re-integration into society. A joint effort is needed to achieve this goal. This study shows that scenario analysis leads to useful guidelines for planning organizational strategy in mental health care. PMID:21211015
Storm Water Management Model (SWMM): Performance Review and Gap Analysis
The Storm Water Management Model (SWMM) is a widely used tool for urban drainage design and planning. Hundreds of peer-reviewed articles and conference proceedings have been written describing applications of SWMM. This review focused on collecting information on model performanc...
75 FR 2514 - Privacy Act of 1974; System of Records
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-15
... supervision; workforce study and analysis; manpower requirements studies; emergency loan program and training curricula planning and research. ROUTINE USES OF RECORDS MAINTAINED IN THE SYSTEM, INCLUDING CATEGORIES OF... appropriate. Records relating to adverse actions, grievances, excluding EEO complaints and performance-based...
14 CFR 121.422 - Aircraft dispatchers: Initial and transition ground training.
Code of Federal Regulations, 2011 CFR
2011-01-01
... computations; (iv) Basic airplane performance dispatch requirements and procedures; (v) Flight planning including track selection, flight time analysis, and fuel requirements; and (vi) Emergency procedures. (3... procedures, and other subjects having a bearing on dispatcher duties and responsibilities; (ii) Flight...
14 CFR 121.422 - Aircraft dispatchers: Initial and transition ground training.
Code of Federal Regulations, 2012 CFR
2012-01-01
... computations; (iv) Basic airplane performance dispatch requirements and procedures; (v) Flight planning including track selection, flight time analysis, and fuel requirements; and (vi) Emergency procedures. (3... procedures, and other subjects having a bearing on dispatcher duties and responsibilities; (ii) Flight...
14 CFR 121.422 - Aircraft dispatchers: Initial and transition ground training.
Code of Federal Regulations, 2013 CFR
2013-01-01
... computations; (iv) Basic airplane performance dispatch requirements and procedures; (v) Flight planning including track selection, flight time analysis, and fuel requirements; and (vi) Emergency procedures. (3... procedures, and other subjects having a bearing on dispatcher duties and responsibilities; (ii) Flight...
14 CFR 121.422 - Aircraft dispatchers: Initial and transition ground training.
Code of Federal Regulations, 2010 CFR
2010-01-01
... computations; (iv) Basic airplane performance dispatch requirements and procedures; (v) Flight planning including track selection, flight time analysis, and fuel requirements; and (vi) Emergency procedures. (3... procedures, and other subjects having a bearing on dispatcher duties and responsibilities; (ii) Flight...
14 CFR 121.422 - Aircraft dispatchers: Initial and transition ground training.
Code of Federal Regulations, 2014 CFR
2014-01-01
... computations; (iv) Basic airplane performance dispatch requirements and procedures; (v) Flight planning including track selection, flight time analysis, and fuel requirements; and (vi) Emergency procedures. (3... procedures, and other subjects having a bearing on dispatcher duties and responsibilities; (ii) Flight...
FIELD SAMPLING PROTOCOLS AND ANALYSIS
I have been asked to speak again to the environmental science class regarding actual research scenarios related to my work at Kerr Lab. I plan to discuss sampling protocols along with various field analyses performed during sampling activities. Many of the students have never see...
Status of Test and Analysis Plans For 915 MHz Wind Profiler Replacement Technology Assessment
NASA Technical Reports Server (NTRS)
Roberts, Barry C.; Barbre/Jacobs, BJ
2017-01-01
Evaluate the performance and output of instruments that could replace the current 915-MHz Doppler Radar Wind Profiler (DRWP) networks at the Eastern Range (ER) and Western Range (WR) over a three month (12 week) period.
12 CFR 917.5 - Strategic business plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... ongoing market research and consultations with members, associates and public and private organizations... quantitative performance goals for Bank products related to multi-family housing, small business, small farm... existing activities; and (5) Be supported by appropriate and timely research and analysis of relevant...
12 CFR 917.5 - Strategic business plan.
Code of Federal Regulations, 2014 CFR
2014-01-01
... ongoing market research and consultations with members, associates and public and private organizations... quantitative performance goals for Bank products related to multi-family housing, small business, small farm... existing activities; and (5) Be supported by appropriate and timely research and analysis of relevant...
12 CFR 917.5 - Strategic business plan.
Code of Federal Regulations, 2013 CFR
2013-01-01
... ongoing market research and consultations with members, associates and public and private organizations... quantitative performance goals for Bank products related to multi-family housing, small business, small farm... existing activities; and (5) Be supported by appropriate and timely research and analysis of relevant...
12 CFR 917.5 - Strategic business plan.
Code of Federal Regulations, 2012 CFR
2012-01-01
... ongoing market research and consultations with members, associates and public and private organizations... quantitative performance goals for Bank products related to multi-family housing, small business, small farm... existing activities; and (5) Be supported by appropriate and timely research and analysis of relevant...
12 CFR 917.5 - Strategic business plan.
Code of Federal Regulations, 2011 CFR
2011-01-01
... ongoing market research and consultations with members, associates and public and private organizations... quantitative performance goals for Bank products related to multi-family housing, small business, small farm... existing activities; and (5) Be supported by appropriate and timely research and analysis of relevant...
77 FR 14525 - Statement of Organization, Functions, and Delegations of Authority
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-12
... maintains the CDC Computer Security Incident Response Team; (4) performs cyber security incident reporting... systems planning and support; internal security and emergency preparedness; and management analysis and... security; education, training, and workforce development in information and IT disciplines; development and...
Development of a plan for automating integrated circuit processing
NASA Technical Reports Server (NTRS)
1971-01-01
The operations analysis and equipment evaluations pertinent to the design of an automated production facility capable of manufacturing beam-lead CMOS integrated circuits are reported. The overall plan shows approximate cost of major equipment, production rate and performance capability, flexibility, and special maintenance requirements. Direct computer control is compared with supervisory-mode operations. The plan is limited to wafer processing operations from the starting wafer to the finished beam-lead die after separation etching. The work already accomplished in implementing various automation schemes, and the type of equipment which can be found for instant automation are described. The plan is general, so that small shops or large production units can perhaps benefit. Examples of major types of automated processing machines are shown to illustrate the general concepts of automated wafer processing.
Experimental study of trajectory planning and control of a high precision robot manipulator
NASA Technical Reports Server (NTRS)
Nguyen, Charles C.; Antrazi, Sami S.
1991-01-01
The kinematic and trajectory planning is presented for a 6 DOF end-effector whose design was based on the Stewart Platform mechanism. The end-effector was used as a testbed for studying robotic assembly of NASA hardware with passive compliance. Vector analysis was employed to derive a closed-form solution for the end-effector inverse kinematic transformation. A computationally efficient numerical solution was obtained for the end-effector forward kinematic transformation using Newton-Raphson method. Three trajectory planning schemes, two for fine motion and one for gross motion, were developed for the end-effector. Experiments conducted to evaluate the performance of the trajectory planning schemes showed excellent tracking quality with minimal errors. Current activities focus on implementing the developed trajectory planning schemes on mating and demating space-rated connectors and using the compliant platform to acquire forces/torques applied on the end-effector during the assembly task.
Medically Serious Suicide Attempters with or without Plan in Rural China1
Sun, Long; Zhang, Jie
2015-01-01
Although previous studies have discussed the risk factors of unplanned suicide behavior in several countries, the unplanned suicide attempt in China was not explored in a large sample. We aim to look into the characteristics of unplanned suicide attempters in China, and compare them with those suicide attempters with plans. Subjects were 791 medically serious suicide attempters aged 15–54 years in rural China. The sixth item of Beck’s Suicide Intent Scale (SIS) was used to estimate the planned and unplanned suicide attempt. Logistic regression analysis was performed to examine the factors related to planned or unplanned suicide attempt. The results showed that the planned suicide attempt were associated with higher education, hopelessness and prior suicide act. The unplanned suicide attempt tend to suicide by pesticide and store pesticide at home. A ban of lethal pesticides may be a method for suicide prevention in rural China. PMID:26524517
NASA Astrophysics Data System (ADS)
Langton, John T.; Caroli, Joseph A.; Rosenberg, Brad
2008-04-01
To support an Effects Based Approach to Operations (EBAO), Intelligence, Surveillance, and Reconnaissance (ISR) planners must optimize collection plans within an evolving battlespace. A need exists for a decision support tool that allows ISR planners to rapidly generate and rehearse high-performing ISR plans that balance multiple objectives and constraints to address dynamic collection requirements for assessment. To meet this need we have designed an evolutionary algorithm (EA)-based "Integrated ISR Plan Analysis and Rehearsal System" (I2PARS) to support Effects-based Assessment (EBA). I2PARS supports ISR mission planning and dynamic replanning to coordinate assets and optimize their routes, allocation and tasking. It uses an evolutionary algorithm to address the large parametric space of route-finding problems which is sometimes discontinuous in the ISR domain because of conflicting objectives such as minimizing asset utilization yet maximizing ISR coverage. EAs are uniquely suited for generating solutions in dynamic environments and also allow user feedback. They are therefore ideal for "streaming optimization" and dynamic replanning of ISR mission plans. I2PARS uses the Non-dominated Sorting Genetic Algorithm (NSGA-II) to automatically generate a diverse set of high performing collection plans given multiple objectives, constraints, and assets. Intended end users of I2PARS include ISR planners in the Combined Air Operations Centers and Joint Intelligence Centers. Here we show the feasibility of applying the NSGA-II algorithm and EAs in general to the ISR planning domain. Unique genetic representations and operators for optimization within the ISR domain are presented along with multi-objective optimization criteria for ISR planning. Promising results of the I2PARS architecture design, early software prototype, and limited domain testing of the new algorithm are discussed. We also present plans for future research and development, as well as technology transition goals.
48 CFR 2452.216-73 - Performance evaluation plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Performance evaluation plan... 2452.216-73 Performance evaluation plan. As prescribed in 2416.406(e)(3), insert the following clause in all award fee contracts: Performance Evaluation Plan (AUG 1987) (a) The Government shall...
48 CFR 3052.216-72 - Performance evaluation plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Performance evaluation... CONTRACT CLAUSES Text of Provisions and Clauses 3052.216-72 Performance evaluation plan. As prescribed in... Evaluation Plan (DEC 2003) (a) A Performance Evaluation Plan shall be unilaterally established by the...
National Highway Traffic Safety Administration FY 1995 Performance Plan
DOT National Transportation Integrated Search
1994-09-01
The NHTSA Fiscal Year 1995 performance plan for the Government Performance and Results Act of 1993 (GPRA) is the second in the three year pilot phase of the Act. This plan differs from the FY 1994 plan in two respects: 1) it uses a different "perform...
Training hospital managers for strategic planning and management: a prospective study.
Terzic-Supic, Zorica; Bjegovic-Mikanovic, Vesna; Vukovic, Dejana; Santric-Milicevic, Milena; Marinkovic, Jelena; Vasic, Vladimir; Laaser, Ulrich
2015-02-26
Training is the systematic acquisition of skills, rules, concepts, or attitudes and is one of the most important components in any organization's strategy. There is increasing demand for formal and informal training programs especially for physicians in leadership positions. This study determined the learning outcomes after a specific training program for hospital management teams. The study was conducted during 2006 and 2007 at the Centre School of Public Health and Management, Faculty of Medicine, University of Belgrade and included 107 participants involved in the management in 20 Serbian general hospitals. The management teams were multidisciplinary, consisting of five members on average: the director of the general hospital, the deputy directors, the head nurse, and the chiefs of support services. The managers attended a training program, which comprised four modules addressing specific topics. Three reviewers independently evaluated the level of management skills at the beginning and 12 months after the training program. Principal component analysis and subsequent stepwise multiple linear regression analysis were performed to determine predictors of learning outcomes. The quality of the SWOT (strengths, weaknesses, opportunities and threats) analyses performed by the trainees improved with differences between 0.35 and 0.49 on a Likert scale (p < 0.001). Principal component analysis explained 81% of the variance affecting their quality of strategic planning. Following the training program, the external environment, strategic positioning, and quality of care were predictors of learning outcomes. The four regression models used showed that the training program had positive effects (p < 0.001) on the ability to formulate a Strategic Plan comprising the hospital mission, vision, strategic objectives, and action plan. This study provided evidence that training for strategic planning and management enhanced the strategic decision-making of hospital management teams, which is a requirement for hospitals in an increasingly competitive, complex and challenging context. For the first time, half of state general hospitals involved in team training have formulated the development of an official strategic plan. The positive effects of the formal training program justify additional investment in future education and training.
Virtual planning in orthognathic surgery.
Stokbro, K; Aagaard, E; Torkov, P; Bell, R B; Thygesen, T
2014-08-01
Numerous publications regarding virtual surgical planning protocols have been published, most reporting only one or two case reports to emphasize the hands-on planning. None have systematically reviewed the data published from clinical trials. This systematic review analyzes the precision and accuracy of three-dimensional (3D) virtual surgical planning of orthognathic procedures compared with the actual surgical outcome following orthognathic surgery reported in clinical trials. A systematic search of the current literature was conducted to identify clinical trials with a sample size of more than five patients, comparing the virtual surgical plan with the actual surgical outcome. Search terms revealed a total of 428 titles, out of which only seven articles were included, with a combined sample size of 149 patients. Data were presented in three different ways: intra-class correlation coefficient, 3D surface area with a difference <2mm, and linear and angular differences in three dimensions. Success criteria were set at 2mm mean difference in six articles; 125 of the 133 patients included in these articles were regarded as having had a successful outcome. Due to differences in the presentation of data, meta-analysis was not possible. Virtual planning appears to be an accurate and reproducible method for orthognathic treatment planning. A more uniform presentation of the data is necessary to allow the performance of a meta-analysis. Currently, the software system most often used for 3D virtual planning in clinical trials is SimPlant (Materialise). More independent clinical trials are needed to further validate the precision of virtual planning. Copyright © 2014 International Association of Oral and Maxillofacial Surgeons. All rights reserved.
Poster - 22: Retrospective analysis of portal dosimetry based QA of Prostate VMAT Plans
DOE Office of Scientific and Technical Information (OSTI.GOV)
Badu, Shyam; Darko, Johnson; Fleck, Andre
2016-08-15
Purpose: The purpose of this study is to retrospectively analyze the portal dosimetry based quality assurance of prostate VMAT plans. Methods: Our standard quality assurance of VMAT treatment plans are performed using EPID installed on Varian TrueBeam Linac. In our current study we analyzed 84 prostate pretreatment VMAT plans. All plans consisted of two arcs, 7800cGy in 39 fractions with a 6MV beam. For each of these VMAT plans, the measured fluence for each arc is compared with the reference fluence using gamma index analysis. Results: We have compared the gamma passing rates for three criteria; 3%/3mm, 2%/2mm and 1%/1mm.more » Out of 168 arcs measured, the number below the gamma passing rate 95% using the area, Field+1cm, are 0, 2, and 124 for 3%/3mm, 2%/2mm and 1%/1mm criteria respectively. Corresponding numbers for MLC CIAO are 0, 2, and 139 respectively. The average gamma passing rate for all arcs measured using Field+1cm are 99.9±0.4, 99.6±1.2, and 90.9±6.5 for 3%/3mm, 2%/2mm and 1%/1mm respectively. Similarly if the MLC CIAO area is analyzed, a passing rate of 99.9±0.2, 99.2±1.2 and 87.2±8.5 respectively was observed. The average of the maximum gamma was also found to increase with tighter criteria. Conclusion: Analysis of prostate VMAT quality assurance plans indicate that the gamma passing rate is sensitive to the criteria and the area analyzed.« less
Saminathan, Sathiyan; Chandraraj, Varatharaj; Sridhar, C H; Manickam, Ravikumar
2012-01-01
To compare the measured and calculated individual and composite field planar dose distribution of Intensity Modulated Radiotherapy plans. The measurements were performed in Clinac DHX linear accelerator with 6 MV photons using Matrixx device and a solid water phantom. The 20 brain tumor patients were selected for this study. The IMRT plan was carried out for all the patients using Eclipse treatment planning system. The verification plan was produced for every original plan using CT scan of Matrixx embedded in the phantom. Every verification field was measured by the Matrixx. The TPS calculated and measured dose distributions were compared for individual and composite fields. The percentage of gamma pixel match for the dose distribution patterns were evaluated using gamma histogram. The gamma pixel match was 95-98% for 41 fields (39%) and 98% for 59 fields (61%) with individual fields. The percentage of gamma pixel match was 95-98% for 5 patients and 98% for other 12 patients with composite fields. Three patients showed a gamma pixel match of less than 95%. The comparison of percentage gamma pixel match for individual and composite fields showed more than 2.5% variation for 6 patients, more than 1% variation for 4 patients, while the remaining 10 patients showed less than 1% variation. The individual and composite field measurements showed good agreement with TPS calculated dose distribution for the studied patients. The measurement and data analysis for individual fields is a time consuming process, the composite field analysis may be sufficient enough for smaller field dose distribution analysis with array detectors.
7 CFR 761.10 - Planning and performing construction and other development.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 7 2011-01-01 2011-01-01 false Planning and performing construction and other... Provisions § 761.10 Planning and performing construction and other development. (a) Purpose. This section describes Agency policies regarding the planning and performing of construction and other development work...
Hendriks, Michelle; Spreeuwenberg, Peter; Rademakers, Jany; Delnoij, Diana M J
2009-09-17
Many countries have introduced elements of managed competition in their healthcare system with the aim to accomplish more efficient and demand-driven health care. Simultaneously, generating and reporting of comparative healthcare information has become an important quality-improvement instrument. We examined whether the introduction of managed competition in the Dutch healthcare system along with public reporting of quality information was associated with performance improvement in health plans. Experiences of consumers with their health plan were measured in four consecutive years (2005-2008) using the CQI(R) health plan instrument 'Experiences with Healthcare and Health Insurer'. Data were available of 13,819 respondents (response = 45%) of 30 health plans in 2005, of 8,266 respondents (response = 39%) of 32 health plans in 2006, of 8,088 respondents (response = 34%) of 32 health plans in 2007, and of 7,183 respondents (response = 31%) of 32 health plans in 2008. We performed multilevel regression analyses with three levels: respondent, health plan and year of measurement. Per year and per quality aspect, we estimated health plan means while adjusting for consumers' age, education and self-reported health status. We tested for linear and quadratic time effects using chi-squares. The overall performance of health plans increased significantly from 2005 to 2008 on four quality aspects. For three other aspects, we found that the overall performance first declined and then increased from 2006 to 2008, but the performance in 2008 was not better than in 2005. The overall performance of health plans did not improve more often for quality aspects that were identified as important areas of improvement in the first year of measurement. On six out of seven aspects, the performance of health plans that scored below average in 2005 increased more than the performance of health plans that scored average and/or above average in that year. We found mixed results concerning the effects of managed competition on the performance of health plans. To determine whether managed competition in the healthcare system leads to quality improvement in health plans, it is important to examine whether and for what reasons health plans initiate improvement efforts.
Sherwood, Jennifer; Sharp, Alana; Cooper, Bergen; Roose-Snyder, Beirne; Blumenthal, Susan
2017-01-01
Abstract National Strategic Plans (NSPs) for HIV/AIDS are country planning documents that set priorities for programmes and services, including a set of targets to quantify progress toward national and international goals. The inclusion of sex-disaggregated targets and targets to combat gender inequality is important given the high disease burden among young women and adolescent girls in Sub-Saharan Africa, yet no comprehensive gender-focused analysis of NSP targets has been performed. This analysis quantitatively evaluates national HIV targets, included in NSPs from eighteen Sub-Saharan African countries, for sex-disaggregation. Additionally, NSP targets aimed at reducing gender-based inequality in health outcomes are compiled and inductively coded to report common themes. On average, in the eighteen countries included in this analysis, 31% of NSP targets include sex-disaggregation (range 0–92%). Three countries disaggregated a majority (>50%) of their targets by sex. Sex-disaggregation in data reporting was more common for targets related to the early phases of the HIV care continuum: 83% of countries included any sex-disaggregated targets for HIV prevention, 56% for testing and linkage to care, 22% for improving antiretroviral treatment coverage, and 11% for retention in treatment. The most common target to reduce gender inequality was to prevent gender-based violence (present in 50% of countries). Other commonly incorporated target areas related to improving women’s access to family planning, human and legal rights, and decision-making power. The inclusion of sex-disaggregated targets in national planning is vital to ensure that programmes make progress for all population groups. Improving the availability and quality of indicators to measure gender inequality, as well as evaluating programme outcomes by sex, is critical to tracking this progress. This analysis reveals an urgent need to set specific and separate targets for men and women in order to achieve an equitable and effective HIV response and align government planning with international priorities for gender equality. PMID:28973358
ERIC Educational Resources Information Center
Clarkson, P. C.
Descriptions of Papua New Guinea's national high schools, grade 12 major/minor mathematics courses, and an analysis of the 1980 and 1981 major/minor course examination results are presented. The analysis is intended for use by post year 12 lecturers/instructors planning their courses. Findings indicate that topic scores were far too low for these…
The Technical Work Plan Tracking Tool
NASA Technical Reports Server (NTRS)
Chullen, Cinda; Leighton, Adele; Weller, Richard A.; Woodfill, Jared; Parkman, William E.; Ellis, Glenn L.; Wilson, Marilyn M.
2003-01-01
The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.
a Simulation-As Framework Facilitating Webgis Based Installation Planning
NASA Astrophysics Data System (ADS)
Zheng, Z.; Chang, Z. Y.; Fei, Y. F.
2017-09-01
Installation Planning is constrained by both natural and social conditions, especially for spatially sparse but functionally connected facilities. Simulation is important for proper deploy in space and configuration in function of facilities to make them a cohesive and supportive system to meet users' operation needs. Based on requirement analysis, we propose a framework to combine GIS and Agent simulation to overcome the shortness in temporal analysis and task simulation of traditional GIS. In this framework, Agent based simulation runs as a service on the server, exposes basic simulation functions, such as scenario configuration, simulation control, and simulation data retrieval to installation planners. At the same time, the simulation service is able to utilize various kinds of geoprocessing services in Agents' process logic to make sophisticated spatial inferences and analysis. This simulation-as-a-service framework has many potential benefits, such as easy-to-use, on-demand, shared understanding, and boosted performances. At the end, we present a preliminary implement of this concept using ArcGIS javascript api 4.0 and ArcGIS for server, showing how trip planning and driving can be carried out by agents.
Transportation planning performance measures : appendices.
DOT National Transportation Integrated Search
2005-10-01
The article is the appendices for Transportation Planning Performance Measures. : Oregon transportation plans, including the statewide Oregon Transportation Plan, and current regional transportation plans for the Portland, Salem, Eugene, and Medford ...
Robustness in practice--the regional planning of health services.
Best, G; Parston, G; Rosenhead, J
1986-05-01
Earlier work has criticized the dominant tendencies in operational research contributions to health services planning as characterized by optimization, implausible demands for data, depoliticization, hierarchy and inflexibility. This paper describes an effort which avoids at least some of these pitfalls. The project was to construct a planning system for a regional health council in Ontario, Canada, which would take account of the possible alternative future states of the health-care system's environment and would aim to keep options for future development open. The planning system devised is described in the paper. It is based on robustness analysis, which evaluates alternative initial action sets in terms of the useful flexibility they preserve. Other features include the explicit incorporation of pressures for change generated outside the health-care system, and a satisficing approach to the identification of both initial action sets and alternative future configurations of the health-care system. It was found possible to borrow and radically 're-use' techniques or formulations from the mainstream of O.R. contributions. Thus the 'reference projection' method was used to identify inadequacies in performance which future health-care system configurations must repair. And Delphi analysis, normally a method for generating consensus, was used in conjunction with cluster analysis of responses to generate meaningfully different alternative futures.
NASA Astrophysics Data System (ADS)
Mteri, Hassan H.
This thesis investigated the business processes required to translate corporate-level strategic plans into tactical and operational plans in the context of transportation asset management. The study also developed a framework for effective performance measure for departments of transportation. The thesis was based on a case study of transportation agencies in the U.S.A. and Canada. The scope is therefore limited or more directly applicable to transportation assets such as pavement, bridges and culverts. The goal was to address the problem of translating or managing strategic plans, especially in the context of the public sector responsible for operating transportation infrastructure. It was observed that many agencies have been successful in formulating good strategic plans but they have performed relatively poorly in translating such corporate-level strategic plans into operational activities. A questionnaire survey was designed and targeted about 30 state agencies that are currently active in transportation asset management. Twenty one (21) transportation agencies in the USA and Canada responded to the questionnaire. The analysis of the questionnaire data showed that there is a lack of a standard approach to managing corporate strategic plans in transportation agencies. The results also indicated that most transportation agencies operate in three organizational levels but there was no systematic approach of translating goal and objectives from high level to lower levels. Approaches in performance measurement were found to vary from agency to agency. A number of limitations were identified in the existing practice on performance measurements. Key weaknesses include the large number of measures in use (as many as 25 or more), and the disconnection between the measures used and the corporate goals and objectives. Lessons from the private sector were thoroughly reviewed in order to build the groundwork for adapting existing tools to the public sector. The existing literature, assumptions and characteristics that make the Balanced Scorecards and strategy maps work effectively in the private sector were identified. Gaps in implementation of strategic plans and the use of Balanced Scorecard in the public sector were derived. Although Balanced Scorecards have previously been used to a limited extent in transportation agencies, the use of combined Balanced Scorecards and strategy maps with a much broader utility of translating strategic plans into tactical and operational activities for Transportation Asset Management is yet to be established. The thesis presents a framework to operationalize strategic plans through the combined application of Balanced Scorecards and strategy maps. The proposed framework aligns overarching objectives in all organizational levels: corporate, tactical, and operation, in which detail information is delegated from top level to lower levels. Furthermore, the thesis presents a proposed framework for developing and using effective corporate performance measures. The framework for performance measures provides a key tool for tracking progress and ensuring overall operationalization of strategic plans in transportation agencies. The thesis presents a methodology to assess existing performance measures so that agencies can reduce the number of measures, to be more effective and manageable. It was found that among other good characteristics, corporate performance measures must be tied to agency's goals and objectives and must be sensitive or responsive to program delivery activities and to the impacts of decisions about resource allocation.
Parke, Michael R; Weinhardt, Justin M; Brodsky, Andrew; Tangirala, Subrahmaniam; DeVoe, Sanford E
2018-03-01
Does planning for a particular workday help employees perform better than on other days they fail to plan? We investigate this question by identifying 2 distinct types of daily work planning to explain why and when planning improves employees' daily performance. The first type is time management planning (TMP)-creating task lists, prioritizing tasks, and determining how and when to perform them. We propose that TMP enhances employees' performance by increasing their work engagement, but that these positive effects are weakened when employees face many interruptions in their day. The second type is contingent planning (CP) in which employees anticipate possible interruptions in their work and plan for them. We propose that CP helps employees stay engaged and perform well despite frequent interruptions. We investigate these hypotheses using a 2-week experience-sampling study. Our findings indicate that TMP's positive effects are conditioned upon the amount of interruptions, but CP has positive effects that are not influenced by the level of interruptions. Through this study, we help inform workers of the different planning methods they can use to increase their daily motivation and performance in dynamic work environments. (PsycINFO Database Record (c) 2018 APA, all rights reserved).
2006-03-01
Preparedness.......80 Figure 3. NYC’s RDD Preparedness SWOT Analysis ...................................................82 Figure 4. The Four Hurdles...In order to properly plan for an increase in RDD preparedness, it is helpful to perform a basic SWOT analysis (Figure 3) of NYC’s first responder...3rd ed. (San Francisco: Jossey-Bass, 2004), 127. 82 Figure 3. NYC’s RDD Preparedness SWOT Analysis Four strategic issues emerge from the RDD
Valuing the Accreditation Process
ERIC Educational Resources Information Center
Bahr, Maria
2018-01-01
The value of the National Association for Developmental Education (NADE) accreditation process is far-reaching. Not only do students and programs benefit from the process, but also the entire institution. Through data collection of student performance, analysis, and resulting action plans, faculty and administrators can work cohesively towards…
40 CFR 60.2890 - How are these new source performance standards structured?
Code of Federal Regulations, 2010 CFR
2010-07-01
... standards structured? 60.2890 Section 60.2890 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... standards contain nine major components, as follows: (a) Preconstruction siting analysis. (b) Waste management plan. (c) Operator training and qualification. (d) Emission limitations and operating limits. (e...
DOT National Transportation Integrated Search
1997-02-01
This report focuses on the Clean Air Act (CAAA) and the State Air Quality Implementation Plan (SIP) and the need for conformity with transportation measures and policies. The Intermodal Surface Transportation Efficiency Act (ISTEA) has reinforced Fed...
Strategic Planning for School Success.
ERIC Educational Resources Information Center
Herman, Jerry J.
1993-01-01
Strategic planners concerned with such matters as high-achieving students, high-performing teachers, broad-based community support, and a two-way involvement with the community must analyze the strengths, weaknesses, opportunities, and threats existing in the school's internal and external environment. A sample SWOT analysis is included. (MLH)
Creating Digital Scholarship Services at Appalachian State University
ERIC Educational Resources Information Center
Mitchem, Pamela Price; Rice, Dea Miller
2017-01-01
This article reviews literature related to building digital scholarship centers and explores the experience of Appalachian State University Libraries in planning and implementing a digital scholarship program. Appalachian surveyed its faculty, performed a gap analysis of existing services, compared programs at other universities, and inventoried…
76 FR 82283 - Privacy Act of 1974; Systems of Records
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-30
..., excluding EEO complaints and performance-based actions, except SF-50s, will be retained for seven years... counseling; administration and personnel supervision; workforce study and analysis; manpower requirements studies; emergency loan program; and training curricula planning and research. Routine uses of records...
40 CFR 57.405 - Formulation, approval, and implementation of requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... completion of the measures specified in the approved plan evaluating the performance and adequacy of the SCS.... The reliability study shall include a comprehensive analysis of the system's operation during one or... (CONTINUED) AIR PROGRAMS (CONTINUED) PRIMARY NONFERROUS SMELTER ORDERS Supplementary Control System...
40 CFR 57.405 - Formulation, approval, and implementation of requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... completion of the measures specified in the approved plan evaluating the performance and adequacy of the SCS.... The reliability study shall include a comprehensive analysis of the system's operation during one or... (CONTINUED) AIR PROGRAMS (CONTINUED) PRIMARY NONFERROUS SMELTER ORDERS Supplementary Control System...
40 CFR 57.405 - Formulation, approval, and implementation of requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... completion of the measures specified in the approved plan evaluating the performance and adequacy of the SCS.... The reliability study shall include a comprehensive analysis of the system's operation during one or... (CONTINUED) AIR PROGRAMS (CONTINUED) PRIMARY NONFERROUS SMELTER ORDERS Supplementary Control System...
40 CFR 57.405 - Formulation, approval, and implementation of requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... completion of the measures specified in the approved plan evaluating the performance and adequacy of the SCS.... The reliability study shall include a comprehensive analysis of the system's operation during one or... (CONTINUED) AIR PROGRAMS (CONTINUED) PRIMARY NONFERROUS SMELTER ORDERS Supplementary Control System...
The Business of Art Education: A Fairytale Adventure
ERIC Educational Resources Information Center
Buda, Sharon; Fedorenko, Jan; Sheridan, Mary A.
2012-01-01
School reform initiatives designed to improve school quality require strong leadership, strategic planning, data analysis, and systemized performance accountability. Utilizing school reforms includes rethinking curriculum and instruction to improve quality and promote equality, restructuring school operations with a focus on both the students and…
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM proje...
Performance-based planning and programming guidebook.
DOT National Transportation Integrated Search
2013-09-01
"Performance-based planning and programming (PBPP) refers to the application of performance management principles within the planning and programming processes of transportation agencies to achieve desired performance outcomes for the multimodal tran...
Rapid Contingency Simulation Modeling of the NASA Crew Launch Vehicle
NASA Technical Reports Server (NTRS)
Betts, Kevin M.; Rutherford, R. Chad; McDuffie, James; Johnson, Matthew D.
2007-01-01
The NASA Crew Launch Vehicle is a two-stage orbital launcher designed to meet NASA's current as well as future needs for human space flight. In order to free the designers to explore more possibilities during the design phase, a need exists for the ability to quickly perform simulation on both the baseline vehicle as well as the vehicle after proposed changes due to mission planning, vehicle configuration and avionics changes, proposed new guidance and control algorithms, and any other contingencies the designers may wish to consider. Further, after the vehicle is designed and built, the need will remain for such analysis in the event of future mission planning. An easily reconfigurable, modular, nonlinear six-degree-of-freedom simulation matching NASA Marshall's in-house high-fidelity simulator is created with the ability to quickly perform simulation and analysis of the Crew Launch Vehicle throughout the entire launch profile. Simulation results are presented and discussed, and an example comparison fly-off between two candidate controllers is presented.
NASA Technical Reports Server (NTRS)
1988-01-01
This Preliminary Project Implementation Plan (PPIP) was used to examine the feasibility of replacing the current Solid Rocket Boosters on the Space Shuttle with Liquid Rocket Boosters (LRBs). The need has determined the implications of integrating the LRB with the Space Transportation System as the earliest practical date. The purpose was to identify and define all elements required in a full scale development program for the LRB. This will be a reference guide for management of the LRB program, addressing such requirement as design and development, configuration management, performance measurement, manufacturing, product assurance and verification, launch operations, and mission operations support.
Damage modeling and statistical analysis of optics damage performance in MJ-class laser systems.
Liao, Zhi M; Raymond, B; Gaylord, J; Fallejo, R; Bude, J; Wegner, P
2014-11-17
Modeling the lifetime of a fused silica optic is described for a multiple beam, MJ-class laser system. This entails combining optic processing data along with laser shot data to account for complete history of optic processing and shot exposure. Integrating with online inspection data allows for the construction of a performance metric to describe how an optic performs with respect to the model. This methodology helps to validate the damage model as well as allows strategic planning and identifying potential hidden parameters that are affecting the optic's performance.
NASA Astrophysics Data System (ADS)
Turner, Sean
2015-04-01
Water resources planning is a complex and challenging discipline in which decision makers must deal with conflicting objectives, contested socio-economic values and vast uncertainties, including long term hydrological variability. The task is arguably more demanding in England and Wales, where private water companies must adhere to a rigid set of regulatory planning guidelines in order to justify new infrastructural investments. These guidelines prescribe a "capacity expansion" approach to planning: ensure that a deterministic measure of supply, known as "Deployable Output," meets projected demand over a 25-year planning horizon. Deployable Output is derived using a method akin to yield analysis and is commensurate with the maximum rate of supply that a water resources system can sustain without incurring failure under a simulation of historical recorded hydrological conditions. This study examines whether Deployable Output analysis is fit to serve an industry in which: water companies are seeking to invest in cross-company water transfer schemes to deal with loss of water availability brought about by European environmental legislation and an increase in demand driven by population growth; water companies are expected address potential climate change impacts through their planning activities; and regulators wish to benchmark water resource system performance across the separate companies. Of particular interest, then, is the adequacy of Deployable Output analysis as a means to measuring current and future water shortage risk and comparing across supply systems. Data from the UK National River Flow Archive are used to develop a series of hypothetical reservoir systems in two hydrologically contrasting regions -- northwest England/north Wales and Southeast England. The systems are varied by adjusting the draft ratio (ratio of target annual demand to mean annual inflow), the inflow diversity (covariance of streamflow sequences supplying the system), the strength of interconnectivity in the system (water transfer capability as proportion of demand), and the proportion of the target demand that can be drafted from climate-independent supply sources (such as plentiful groundwater supplies or desalination). The reservoir capacities are then adjusted such that all systems are perfectly and equally balanced under current design standards (Deployable Output equals demand) before being subjected to comprehensive reliability, resilience, vulnerability analysis using stochastically-derived replicates of the inflow sequences. Results indicate significant discrepancies in performance, highlighting major deficiencies with the currently-accepted planning metrics as a means to measuring and comparing water shortage risk across supply systems. These discrepancies are evident in both regions examined. The work highlights a need for a reassessment of the prescribed planning methodology to better reflect aspects of water shortage risk, particularly resilience and vulnerability.
14 CFR 136.13 - Helicopter performance plan and operations.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Helicopter performance plan and operations... Helicopter performance plan and operations. (a) Each operator must complete a performance plan before each helicopter commercial air tour, or flight operated under 14 CFR 91.146 or 91.147. The pilot in command must...
14 CFR 136.13 - Helicopter performance plan and operations.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Helicopter performance plan and operations... Helicopter performance plan and operations. (a) Each operator must complete a performance plan before each helicopter commercial air tour, or flight operated under 14 CFR 91.146 or 91.147. The pilot in command must...
14 CFR 136.13 - Helicopter performance plan and operations.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Helicopter performance plan and operations... Helicopter performance plan and operations. (a) Each operator must complete a performance plan before each helicopter commercial air tour, or flight operated under 14 CFR 91.146 or 91.147. The pilot in command must...
34 CFR 300.601 - State performance plans and data collection.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 34 Education 2 2011-07-01 2010-07-01 true State performance plans and data collection. 300.601... Monitoring, Technical Assistance, and Enforcement § 300.601 State performance plans and data collection. (a) General. Not later than December 3, 2005, each State must have in place a performance plan that evaluates...
Park, So-Yeon; Kim, Il Han; Ye, Sung-Joon; Carlson, Joel; Park, Jong Min
2014-11-01
Texture analysis on fluence maps was performed to evaluate the degree of modulation for volumetric modulated arc therapy (VMAT) plans. A total of six textural features including angular second moment, inverse difference moment, contrast, variance, correlation, and entropy were calculated for fluence maps generated from 20 prostate and 20 head and neck VMAT plans. For each of the textural features, particular displacement distances (d) of 1, 5, and 10 were adopted. To investigate the deliverability of each VMAT plan, gamma passing rates of pretreatment quality assurance, and differences in modulating parameters such as multileaf collimator (MLC) positions, gantry angles, and monitor units at each control point between VMAT plans and dynamic log files registered by the Linac control system during delivery were acquired. Furthermore, differences between the original VMAT plan and the plan reconstructed from the dynamic log files were also investigated. To test the performance of the textural features as indicators for the modulation degree of VMAT plans, Spearman's rank correlation coefficients (rs) with the plan deliverability were calculated. For comparison purposes, conventional modulation indices for VMAT including the modulation complexity score for VMAT, leaf travel modulation complexity score, and modulation index supporting station parameter optimized radiation therapy (MISPORT) were calculated, and their correlations were analyzed in the same way. There was no particular textural feature which always showed superior correlations with every type of plan deliverability. Considering the results comprehensively, contrast (d = 1) and variance (d = 1) generally showed considerable correlations with every type of plan deliverability. These textural features always showed higher correlations to the plan deliverability than did the conventional modulation indices, except in the case of modulating parameter differences. The rs values of contrast to the global gamma passing rates with criteria of 2%/2 mm, 2%/1 mm, and 1%/2 mm were 0.536, 0.473, and 0.718, respectively. The respective values for variance were 0.551, 0.481, and 0.688. In the case of local gamma passing rates, the rs values of contrast were 0.547, 0.578, and 0.620, respectively, and those of variance were 0.519, 0.527, and 0.569. All of the rs values in those cases were statistically significant (p < 0.003). In the cases of global and local gamma passing rates, MISPORT showed the highest correlations among the conventional modulation indices. For global passing rates, rs values of MISPORT were -0.420, -0.330, and -0.632, respectively, and those for local passing rates were -0.455, -0.490 and -0.502. The values of rs of contrast, variance, and MISPORT with the MLC errors were -0.863, -0.828, and 0.795, respectively, all with statistical significances (p < 0.001). The correlations with statistical significances between variance and dose-volumetric differences were observed more frequently than the others. The contrast (d = 1) and variance (d = 1) calculated from fluence maps of VMAT plans showed considerable correlations with the plan deliverability, indicating their potential use as indicators for assessing the degree of modulation of VMAT plans. Both contrast and variance consistently showed better performance than the conventional modulation indices for VMAT.
NASA Technical Reports Server (NTRS)
Ferragut, N. J.
1982-01-01
The Shuttle Pointed Autonomous Research Tool for Astronomy (SPARTAN) family of spacecraft are intended to operate with minimum interfaces with the U.S. Space Shuttle in order to increase flight opportunities. The SPARTAN I Spacecraft was designed to enhance structural capabilities and increase reliability. The approach followed results from work experience which evolved from sounding rocket projects. Structural models were developed to do the analyses necessary to satisfy safety requirements for Shuttle hardware. A loads analysis must also be performed. Stress analysis calculations will be performed on the main structural elements and subcomponents. Attention is given to design considerations and program definition, the schematic representation of a finite element model used for SPARTAN I spacecraft, details of loads analysis, the stress analysis, and fracture mechanics plan implications.
Prototyping and Characterization of an Adjustable Skew Angle Single Gimbal Control Moment Gyroscope
2015-03-01
performance, and an analysis of the test results is provided. In addition to the standard battery of CMG performance tests that were planned, a...objectives for this new CMG is to provide comparable performance to the Andrews CMGs, the values in Table 1 will be used for output torque comparison...essentially fixed at 53.4°. This specific skew angle value is not the problem, as this is one commonly used CMG skew angle for satellite systems. The real
Reed, G; Reed, D H
1999-05-01
When planning a picture archiving and communications system (PACS) implementation and determining which equipment will be implemented in earlier and later phases, collection and analysis of selected data will aid in setting implementation priorities. If baseline data are acquired relative to performance objectives, the same information used for implementation planning can be used to measure performance improvement and outcomes. The main categories of data to choose from are: (1) financial data; (2) productivity data; (3) operational parameters; (4) clinical data; and (5) information about customer satisfaction. In the authors' experience, detailed workflow data have not proved valuable in measuring PACS performance and outcomes. Reviewing only one category of data in planning will not provide adequate basis for targeting operational improvements that will lead to the most significant gains. Quality improvement takes into account all factors in production: human capacity, materials, operating capital and assets. Once we have identified key areas of focus for quality improvement in each phase, we can translate objectives into implementation requirements and finally into detailed functional and performance requirements. Here, Integration Resources reports its experience measuring PACS performance relative to phased implementation strategies for three large medical centers. Each medical center had its own objectives for overcoming image management, physical/geographical, and functional/technical barriers. The report outlines (1) principal financial and nonfinancial measures used as performance indicators; (2) implementation strategies chosen by each of the three medical centers; and (3) the results of those strategies as compared with baseline data.
Maeng, Daniel D; Scanlon, Dennis P; Chernew, Michael E; Gronniger, Tim; Wodchis, Walter P; McLaughlin, Catherine G
2010-01-01
Objective To examine the extent to which health plan quality measures capture physician practice patterns rather than plan characteristics. Data Source We gathered and merged secondary data from the following four sources: a private firm that collected information on individual physicians and their health plan affiliations, The National Committee for Quality Assurance, InterStudy, and the Dartmouth Atlas. Study Design We constructed two measures of physician network overlap for all health plans in our sample and linked them to selected measures of plan performance. Two linear regression models were estimated to assess the relationship between the measures of physician network overlap and the plan performance measures. Principal Findings The results indicate that in the presence of a higher degree of provider network overlap, plan performance measures tend to converge to a lower level of quality. Conclusions Standard health plan performance measures reflect physician practice patterns rather than plans' effort to improve quality. This implies that more provider-oriented measurement, such as would be possible with accountable care organizations or medical homes, may facilitate patient decision making and provide further incentives to improve performance. PMID:20403064
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, S; Zhang, H; Zhang, B
2015-06-15
Purpose: To clinically evaluate the differences in volumetric modulated arc therapy (VMAT) treatment plan and delivery between two commercial treatment planning systems. Methods: Two commercial VMAT treatment planning systems with different VMAT optimization algorithms and delivery approaches were evaluated. This study included 16 clinical VMAT plans performed with the first system: 2 spine, 4 head and neck (HN), 2 brain, 4 pancreas, and 4 pelvis plans. These 16 plans were then re-optimized with the same number of arcs using the second treatment planning system. Planning goals were invariant between the two systems. Gantry speed, dose rate modulation, MLC modulation, planmore » quality, number of monitor units (MUs), VMAT quality assurance (QA) results, and treatment delivery time were compared between the 2 systems. VMAT QA results were performed using Mapcheck2 and analyzed with gamma analysis (3mm/3% and 2mm/2%). Results: Similar plan quality was achieved with each VMAT optimization algorithm, and the difference in delivery time was minimal. Algorithm 1 achieved planning goals by highly modulating the MLC (total distance traveled by leaves (TL) = 193 cm average over control points per plan), while maintaining a relatively constant dose rate (dose-rate change <100 MU/min). Algorithm 2 involved less MLC modulation (TL = 143 cm per plan), but greater dose-rate modulation (range = 0-600 MU/min). The average number of MUs was 20% less for algorithm 2 (ratio of MUs for algorithms 2 and 1 ranged from 0.5-1). VMAT QA results were similar for all disease sites except HN plans. For HN plans, the average gamma passing rates were 88.5% (2mm/2%) and 96.9% (3mm/3%) for algorithm 1 and 97.9% (2mm/2%) and 99.6% (3mm/3%) for algorithm 2. Conclusion: Both VMAT optimization algorithms achieved comparable plan quality; however, fewer MUs were needed and QA results were more robust for Algorithm 2, which more highly modulated dose rate.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan formore » the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.« less
El Shahat, Khaled; El Saeid, Aziza; Attalla, Ehab; Yassin, Adel
2014-01-01
To achieve tumor control for radiotherapy, a dose distribution is planned which has a good chance of sterilizing all cancer cells without causing unacceptable normal tissue complications. The aim of the present study was to achieve an accurate calculation of dose for small field dimensions and perform this by evaluating the accuracy of planning system calculation. This will be compared with real measurement of dose for the same small field dimensions using different detectors. Practical work was performed in two steps: (i) determination of the physical factors required for dose estimation measured by three ionization chambers and calculated by treatment planning system (TPS) based on the latest technical report series (IAEATRS-398) and (ii) comparison of the calculated and measured data. Our data analysis for small field is irradiated by photon energy matched with the data obtained from the ionization chambers and the treatment planning system. Radiographic films were used as an additional detector for the obtained data and showed matching with TPS calculation. It can be concluded that studied small field dimensions were averaged 6% and 4% for 6 MV and 15 MV, respectively. Radiographic film measurements showed a variation in results within ±2% than TPS calculation.
van Oostveen, Catharina J; Ubbink, Dirk T; Mens, Marian A; Pompe, Edwin A; Vermeulen, Hester
2016-03-01
To investigate the reliability, validity and feasibility of the RAFAELA workforce planning system (including the Oulu patient classification system - OPCq), before deciding on implementation in Dutch hospitals. The complexity of care, budgetary restraints and demand for high-quality patient care have ignited the need for transparent hospital workforce planning. Nurses from 12 wards of two university hospitals were trained to test the reliability of the OPCq by investigating the absolute agreement of nursing care intensity (NCI) measurements among nurses. Validity was tested by assessing whether optimal NCI/nurse ratio, as calculated by a regression analysis in RAFAELA, was realistic. System feasibility was investigated through a questionnaire among all nurses involved. Almost 67 000 NCI measurements were performed between December 2013 and June 2014. Agreement using the OPCq varied between 38% and 91%. For only 1 in 12 wards was the optimal NCI area calculated judged as valid. Although the majority of respondents was positive about the applicability and user-friendliness, RAFAELA was not accepted as useful workforce planning system. Nurses' performance using the RAFAELA system did not warrant its implementation. Hospital managers should first focus on enlarging the readiness of nurses regarding the implementation of a workforce planning system. © 2015 John Wiley & Sons Ltd.
Kawahara, Sawako; Tadaka, Etsuko; Okochi, Ayako
2018-06-01
Physical activity (PA) is necessary for improving the health of workers in small- to medium-sized enterprises (SMEs). However, behavioral changes conducive to PA are often difficult to achieve despite intentions. Because intention to perform PA does not always translate to action, proper planning may be critical for achieving PA. In this study, we aimed to identify factors related to planning for PA among workers in SMEs because this is one population that has been identified as being at higher risk for lifestyle-related diseases in Japan. Participants completed a series of validated questionnaires. Of 353 valid responses, 226 individuals (149 men; aged 47.5 ± 8.7 years) stated their intention to perform PA. Multiple regression analysis indicated that a higher PA planning score was significantly associated with higher self-efficacy for PA ( p < 0.001), higher risk perception regarding inactivity ( p = 0.012), and greater knowledge of information about PA community services ( p = 0.019). Therefore, we recommend that self-efficacy, risk perception, and information regarding PA community services are enhanced in the daily working lives of workers at their workplaces. In this manner, they can promote their planning of health behavioral changes in a supportive environment, drawing upon available services, supports, and other resources.
DOT National Transportation Integrated Search
2017-03-01
The performance-planning tool developed as part of this project is intended for use with the guidebook for establishing and using rural performance based transportation system assessment, monitoring, planning, and programming to support the rural pla...
Strategic planning processes and hospital financial performance.
Kaissi, Amer A; Begun, James W
2008-01-01
Many common management practices in healthcare organizations, including the practice of strategic planning, have not been subject to widespread assessment through empirical research. If management practice is to be evidence-based, evaluations of such common practices need to be undertaken. The purpose of this research is to provide evidence on the extent of strategic planning practices and the association between hospital strategic planning processes and financial performance. In 2006, we surveyed a sample of 138 chief executive officers (CEOs) of hospitals in the state of Texas about strategic planning in their organizations and collected financial information on the hospitals for 2003. Among the sample hospitals, 87 percent reported having a strategic plan, and most reported that they followed a variety of common practices recommended for strategic planning-having a comprehensive plan, involving physicians, involving the board, and implementing the plan. About one-half of the hospitals assigned responsibility for the plan to the CEO. We tested the association between these planning characteristics in 2006 and two measures of financial performance for 2003. Three dimensions of the strategic planning process--having a strategic plan, assigning the CEO responsibility for the plan, and involving the board--are positively associated with earlier financial performance. Further longitudinal studies are needed to evaluate the cause-and-effect relationship between planning and performance.
IN SITU FIELD TESTING OF PROCESSES
DOE Office of Scientific and Technical Information (OSTI.GOV)
J.S.Y. YANG
2004-11-08
The purpose of this scientific analysis report is to update and document the data and subsequent analyses from ambient field-testing activities performed in underground drifts and surface-based boreholes through unsaturated zone (UZ) tuff rock units. In situ testing, monitoring, and associated laboratory studies are conducted to directly assess and evaluate the waste emplacement environment and the natural barriers to radionuclide transport at Yucca Mountain. This scientific analysis report supports and provides data to UZ flow and transport model reports, which in turn contribute to the Total System Performance Assessment (TSPA) of Yucca Mountain, an important document for the license applicationmore » (LA). The objectives of ambient field-testing activities are described in Section 1.1. This report is the third revision (REV 03), which supercedes REV 02. The scientific analysis of data for inputs to model calibration and validation as documented in REV 02 were developed in accordance with the Technical Work Plan (TWP) ''Technical Work Plan for: Performance Assessment Unsaturated Zone'' (BSC 2004 [DIRS 167969]). This revision was developed in accordance with the ''Technical Work Plan for: Unsaturated Zone Flow Analysis and Model Report Integration'' (BSC 2004 [DIRS 169654], Section 1.2.4) for better integrated, consistent, transparent, traceable, and more complete documentation in this scientific analysis report and associated UZ flow and transport model reports. No additional testing or analyses were performed as part of this revision. The list of relevant acceptance criteria is provided by ''Technical Work Plan for: Unsaturated Zone Flow Analysis and Model Report Integration'' (BSC 2004 [DIRS 169654]), Table 3-1. Additional deviations from the TWP regarding the features, events, and processes (FEPs) list are discussed in Section 1.3. Documentation in this report includes descriptions of how, and under what conditions, the tests were conducted. The descriptions and analyses provide data useful for refining and confirming the understanding of flow, drift seepage, and transport processes in the UZ. The UZ testing activities included measurement of permeability distribution, quantification of the seepage of water into the drifts, evaluation of fracture-matrix interaction, study of flow along faults, testing of flow and transport between drifts, characterization of hydrologic heterogeneity along drifts, estimation of drying effects on the rock surrounding the drifts due to ventilation, monitoring of moisture conditions in open and sealed drifts, and determination of the degree of minimum construction water migration below drift. These field tests were conducted in two underground drifts at Yucca Mountain, the Exploratory Studies Facility (ESF) drift, and the cross-drift for Enhanced Characterization of the Repository Block (ECRB), as described in Section 1.2. Samples collected in boreholes and underground drifts have been used for additional hydrochemical and isotopic analyses for additional understanding of the UZ setting. The UZ transport tests conducted at the nearby Busted Butte site (see Figure 1-4) are also described in this scientific analysis report.« less
Sexual Assault Prevention and Response Website Analysis
2014-09-01
IRR inter-rater reliability KPI key performance indicator N17 U.S Navy 21st Century Sailor Office NASASV National Association of Services Against...determine if progress is being made to achieve the desired goal; this is typically done by establishing key performance indicators 22 ( KPI ). After...defining the KPIs , organizations must prioritize the potential solutions and devise a plan for making small incremental changes to accurately assess the
LANDSAT-5 orbit adjust maneuver report
NASA Technical Reports Server (NTRS)
Hassett, P. J.; Johnson, R. L.
1984-01-01
The orbit adjust maneuvers performed to raise the LANDSAT 5 spacecraft to mission altitude, synchronize it with the required groundtrack, and properly phase the spacecraft with LANDSAT-4 to provide an 8 day full Earth coverage cycle are described. Maneuver planning and evaluation procedures, data and analysis results for all maneuvers performed to date, the frozen orbit concept, and the phasing requirement between LANDSAT-4 and LANDSAT-5 are also examined.
Defense Acquisition: Overview, Issues, and Options for Congress
2007-06-04
Unified Combatant Commands ( UCCs ); the Defense Agencies; and DOD field activities. The PPBES process consists of four stages; planning, programming...thorough market research is performed for a procurement action. But, opponents could argue that the cost and time necessary to perform the analysis may...they sought, on the other, that the industrialists in their own states and districts got their fair share , or more, of the military contracts there
Information services for comparative analysis of biorhythm research
NASA Technical Reports Server (NTRS)
1972-01-01
References and full text documents are presented in support of continuing research and research planning for the NASA behavioral physiology program. Areas covered include: (1) desynchronosis and performance; (2) effects of alcohol, common colds, drugs, and toxic hazards on performance; (3) effects of stress on rhythm of plasma steroids; (4) data processing of biological rhythms; (5) pharmacology and biological rhythms; (6) mechanisms of biological rhythms; and (7) development of biological rhythms.
Development and Application of an Integrated Approach toward NASA Airspace Systems Research
NASA Technical Reports Server (NTRS)
Barhydt, Richard; Fong, Robert K.; Abramson, Paul D.; Koenke, Ed
2008-01-01
The National Aeronautics and Space Administration's (NASA) Airspace Systems Program is contributing air traffic management research in support of the 2025 Next Generation Air Transportation System (NextGen). Contributions support research and development needs provided by the interagency Joint Planning and Development Office (JPDO). These needs generally call for integrated technical solutions that improve system-level performance and work effectively across multiple domains and planning time horizons. In response, the Airspace Systems Program is pursuing an integrated research approach and has adapted systems engineering best practices for application in a research environment. Systems engineering methods aim to enable researchers to methodically compare different technical approaches, consider system-level performance, and develop compatible solutions. Systems engineering activities are performed iteratively as the research matures. Products of this approach include a demand and needs analysis, system-level descriptions focusing on NASA research contributions, system assessment and design studies, and common systemlevel metrics, scenarios, and assumptions. Results from the first systems engineering iteration include a preliminary demand and needs analysis; a functional modeling tool; and initial system-level metrics, scenario characteristics, and assumptions. Demand and needs analysis results suggest that several advanced concepts can mitigate demand/capacity imbalances for NextGen, but fall short of enabling three-times current-day capacity at the nation s busiest airports and airspace. Current activities are focusing on standardizing metrics, scenarios, and assumptions, conducting system-level performance assessments of integrated research solutions, and exploring key system design interfaces.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kumar, Syam; Aswathi, C.P.
Purpose: To evaluate the directional dependency of 2D seven 29 ion chamber array clinically with different IMRT plans. Methods: 25 patients already treated with IMRT plans were selected for the study. Verification plans were created for each treatment plan in eclipse 10 treatment planning system using the AAA algorithm with the 2D array and the Octavius CT phantom. Verification plans were done 2 times for a single patient. First plan with real IMRT (plan-related approach) and second plan with zero degree gantry angle (field-related approach). Measurements were performed on a Varian Clinac-iX, linear accelerator equipped with a millennium 120 multileafmore » collimator. Fluence was measured for all the delivered plans and analyzed using the verisoft software. Comparison was done by selecting the fluence delivered in static gantry (zero degree gantry) versus IMRT with real gantry angles. Results: The gamma pass percentage is greater than 97 % for all IMRT delivered with zero gantry angle and between 95%–98% for real gantry angles. Dose difference between the TPS calculated and measured for IMRT delivered with zero gantry angle was found to be between (0.03 to 0.06Gy) and with real gantry angles between (0.02 to 0.05Gy). There is a significant difference between the gamma analysis between the zero degree and true angle with a significance of 0.002. Standard deviation of gamma pass percentage between the IMRT plans with zero gantry angle was 0.68 and for IMRT with true gantry angle was found to be 0.74. Conclusion: The gamma analysis for IMRT with zero degree gantry angles shows higher pass percentage than IMRT delivered with true gantry angles. Verification plans delivered with true gantry angles lower the verification accuracy when 2D array is used for measurement.« less
NASA Astrophysics Data System (ADS)
Alexander, A.; DeBlois, F.; Stroian, G.; Al-Yahya, K.; Heath, E.; Seuntjens, J.
2007-07-01
Radiotherapy research lacks a flexible computational research environment for Monte Carlo (MC) and patient-specific treatment planning. The purpose of this study was to develop a flexible software package on low-cost hardware with the aim of integrating new patient-specific treatment planning with MC dose calculations suitable for large-scale prospective and retrospective treatment planning studies. We designed the software package 'McGill Monte Carlo treatment planning' (MMCTP) for the research development of MC and patient-specific treatment planning. The MMCTP design consists of a graphical user interface (GUI), which runs on a simple workstation connected through standard secure-shell protocol to a cluster for lengthy MC calculations. Treatment planning information (e.g., images, structures, beam geometry properties and dose distributions) is converted into a convenient MMCTP local file storage format designated, the McGill RT format. MMCTP features include (a) DICOM_RT, RTOG and CADPlan CART format imports; (b) 2D and 3D visualization views for images, structure contours, and dose distributions; (c) contouring tools; (d) DVH analysis, and dose matrix comparison tools; (e) external beam editing; (f) MC transport calculation from beam source to patient geometry for photon and electron beams. The MC input files, which are prepared from the beam geometry properties and patient information (e.g., images and structure contours), are uploaded and run on a cluster using shell commands controlled from the MMCTP GUI. The visualization, dose matrix operation and DVH tools offer extensive options for plan analysis and comparison between MC plans and plans imported from commercial treatment planning systems. The MMCTP GUI provides a flexible research platform for the development of patient-specific MC treatment planning for photon and electron external beam radiation therapy. The impact of this tool lies in the fact that it allows for systematic, platform-independent, large-scale MC treatment planning for different treatment sites. Patient recalculations were performed to validate the software and ensure proper functionality.
Assessments of Sequential Intensity Modulated Radiation Therapy Boost (SqIB) Treatments Using HART
NASA Astrophysics Data System (ADS)
Pyakuryal, Anil
2009-05-01
A retrospective study was pursued to evaluate the SqIB treatments performed on ten head and neck cancer patients(n=10).Average prescription doses (PDs) of 39 Gy,15Gy and 17.8Gy were delivered consecutively from larger to smaller planning target volumes(ptvs) in three different treatment plans using 6 MV X-ray photon beams from a Linear accelerator (SLA Linac, Elekta) on BID weak on-weak off schedules. These plans were statistically evaluated on basis of plan indices (PIs),dose response of targets and critical structures, and dose tolerance(DT) of various organs utilizing the DVH analysis automated software known as Histogram Analysis in Radiation Therapy-HART(S.Jang et al., 2008, Med Phys 35, p.2812). Mean SqIB PIs were found consistent with the reported values for varying radio-surgical systems.The 95.5%(n=10)of each ptvs and the gross tumor volume also received 95% (n=10)of PDs in treatments. The average volume of ten organs (N=10) affected by each PDs shrank with decreasing size of ptvs in above plans.A largest volume of Oropharynx (79%,n=10,N=10) irradiated at PD, but the largest volume of Larynx (98%, n=10, N=10) was vulnerable to DT of structure (TD50).Thus, we have demonstrated the efficiency and accuracy of HART in the assessment of Linac based plans in radiation therapy treatments of cancer.
Strategic environmental assessment in China: motivations, politics, and effectiveness.
Zhu, Da; Ru, Jiang
2008-09-01
This paper examines how strategic environmental assessment has been practiced at the national level in China through 2005 and why it has been practiced in the manner observed. Based on literature reviews and interviews carried out in 2005 and 2006, we find that bureaucratic politics between environmental and nonenvironmental ministries has limited the legislation and implementation of strategic environmental assessment to environmental assessment (EA) for a set of government plans defined in the 2003 Environmental Impact Assessment Law. Interviewees from environmental and nonenvironmental ministries and key research institutes have reported that few planning EAs have been performed at the sectoral level. Nonenvironmental ministries have either evaded the 2003 Environmental Impact Assessment Law and have not undertaken required planning EA or have organized planning EA on their own without participation by the State Environmental Protection Administration. The rising tension between the environmental and nonenvironmental ministries has limited the role of planning EA as a participatory decision-making tool. In addition to bureaucratic politics, we find that weak public participation and underemphasis on social analysis in planning EA may have further compromised the utility of planning EA.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Haasbeek, Cornelis J.A.; Lagerwaard, Frank J.; Cuijpers, Johan P.
2007-04-01
Purpose: Changes in position or size of target volumes have been observed during radiotherapy for lung cancer. The need for adaptive treatment planning during stereotactic radiotherapy of Stage I tumors was retrospectively analyzed using repeat four-dimensional computed tomography (4DCT) scans. Methods and Materials: A planning study was performed for 60 tumors in 59 patients using 4DCT scans repeated after two or more treatment fractions. Planning target volumes (PTV) encompassed all tumor mobility, and dose distributions from the initial plan were projected onto PTVs derived from the repeat 4DCT. A dosimetric and volumetric analysis was performed. Results: The repeat 4DCT scansmore » were performed at a mean of 6.6 days (range, 2-12 days) after the first fraction of stereotactic radiotherapy. In 25% of cases the repeat PTV was larger, but the difference exceeded 1 mL in 5 patients only. The mean 3D displacement between the center of mass of both PTVs was 2.0 mm. The initial 80% prescription isodose ensured a mean coverage of 98% of repeat PTVs, and this isodose fully encompassed the repeat internal target volumes in all but 1 tumor. 'Inadequate' coverage in the latter was caused by a new area of atelectasis adjacent to the tumor on the repeat 4DCT. Conclusions: Limited 'time trends' were observed in PTVs generated by repeated uncoached 4DCT scans, and the dosimetric consequences proved to be minimal. Treatment based only on the initial PTV would not have resulted in major tumor underdosage, indicating that adaptive treatment planning is of limited value for fractionated stereotactic radiotherapy.« less
Iranian Expert Opinion about Necessary Criteria for Hospitals Management Performance Assessments
Dadgar, Elham; Janati, Ali; Tabrizi, Jafar Sadegh; Asghari-Jafarabadi, Mohammad; Barati, Omid
2012-01-01
Background: Managers in the hospital should have enough managerial skill to be coordinated with the complex environment. Defining a competency framework assessment for hospital man-agement will help to establish core competencies for hospital managers. The aim of this study was to develop concrete and suitable performance assessment criteria using expert's view. Methods: In this qualitative study in total, 20 professionals participated in the interview and Fo¬cus Group Discussions (FGD). Two of informants were interviewed and 18 professionals par¬ticipants in three focus group discussions. Discussions and interviews were well planned, the FGD environments were suitable and after interviews completion the notes were checked with participant for completeness. Thematic analysis method was used for the analysis of qualitative data. Results: Findings from 3 FGDs and 2 semi structured interviews done with 20 professionals were categorized accordance to themes. The findings were classified in 7 major and 41 sub themes. The major themes include competency related to planning, organization and staff per-formance management, leadership, information management, and clinical governance and per-formance indicators. Conclusion: All participants had hospital administration experience; so their explanation impor¬tant in identifying the criteria and developing hospital managers’ performance assessment tool. In addition to professional perspectives and studies done in other countries, in order to design this kind of tools, it is necessary to adopt the obtained findings to the local hospital conditions. PMID:24688938
Meyer, Linda
2002-03-01
This study examined the antecedents and determinants predictive of whether nursing students (N = 92) intend to ask for assignments to perform nursing behaviors after using a database to record essential clinical behaviors. The results of applying the theory of planned behavior (TPB) to behavioral intention using multivariant path analysis suggested that the endogenous variables, attitude and subjective norms, had a significant effect on the intention to ask for assignments to perform nursing behaviors. In addition, it was primarily through attitudes and subjective norms that the respective antecedents or exogenous variables, behavioral beliefs and normative beliefs, affected the intention to ask for assignments to perform nursing behaviors. The lack of direct influence of perceived behavioral control on intention and the direct negative impact of control belief on intention were contrary to expectations, given the tenets of the TPB.
DOE Office of Scientific and Technical Information (OSTI.GOV)
CAP,JEROME S.
2000-08-24
Sandia has recently completed the flight certification test series for the Multi-Spectral Thermal Imaging satellite (MTI), which is a small satellite for which Sandia was the system integrator. A paper was presented at the 16th Aerospace Testing Seminar discussing plans for performing the structural dynamics certification program for that satellite. The testing philosophy was originally based on a combination of system level vibroacoustic tests and component level shock and vibration tests. However, the plans evolved to include computational analyses using both Finite Element Analysis and Statistical Energy Analysis techniques. This paper outlines the final certification process and discuss lessons learnedmore » including both things that went well and things that should/could have been done differently.« less
First BNCT treatment of a skin melanoma in Argentina: dosimetric analysis and clinical outcome.
González, S J; Bonomi, M R; Santa Cruz, G A; Blaumann, H R; Calzetta Larrieu, O A; Menéndez, P; Jiménez Rebagliati, R; Longhino, J; Feld, D B; Dagrosa, M A; Argerich, C; Castiglia, S G; Batistoni, D A; Liberman, S J; Roth, B M C
2004-11-01
A Phase I/II protocol for treating cutaneuos melanomas with BNCT was designed in Argentina by the Comisión Nacional de Energía Atómica and the medical center Instituto Roffo. The first of a cohort of thirty planned patients was treated on October 9, 2003. This article depicts the protocol-based procedure and describes the first clinical case, treatment regime and planning, patient irradiation, retrospective dosimetric analysis and clinical outcome. Considering the low acute skin toxicity and the complete response in 21 of the 25 subcutaneous melanoma nodules treated, a second irradiation was performed in a different location of the extremity of the same patient. The corresponding clinical outcome is still under evaluation.
Lageos assembly operation plan
NASA Technical Reports Server (NTRS)
Brueger, J.
1975-01-01
Guidelines and constraints procedures for LAGEOS assembly, operation, and design performance are given. Special attention was given to thermal, optical, and dynamic analysis and testing. The operation procedures illustrate the interrelation and sequence of tasks in a flow diagram. The diagram also includes quality assurance functions for verification of operation tasks.
78 FR 52467 - Title I-Improving the Academic Achievement of the Disadvantaged
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-23
... Orders 12866 and 13563 Regulatory Impact Analysis Under Executive Order 12866, the Secretary must... or planned by another agency; (3) Materially alter the budgetary impacts of entitlement grants, user... advantages; distributive impacts; and equity); (4) To the extent feasible, specify performance objectives...
Shuttle ECLSS ammonia delivery capability
NASA Technical Reports Server (NTRS)
1976-01-01
The possible effects of excessive requirements on ammonia flow rates required for entry cooling, due to extreme temperatures, on mission plans for the space shuttles, were investigated. An analysis of worst case conditions was performed, and indicates that adequate flow rates are available. No mission impact is therefore anticipated.
COMPUTER TOOLS FOR SANITARY SEWER SYSTEM CAPACITY ANALYSIS AND PLANNING
Rainfall-derived infiltration and inflow (RDII) into sanitary sewer systems has long been recognized as a major source of operating problems, causing poor performance of many sewer systems. RDII is the main cause of SSOs to customer basements, streets, or nearby streams and can a...
Autonomous Mars ascent and orbit rendezvous for earth return missions
NASA Technical Reports Server (NTRS)
Edwards, H. C.; Balmanno, W. F.; Cruz, Manuel I.; Ilgen, Marc R.
1991-01-01
The details of tha assessment of autonomous Mars ascent and orbit rendezvous for earth return missions are presented. Analyses addressing navigation system assessments, trajectory planning, targeting approaches, flight control guidance strategies, and performance sensitivities are included. Tradeoffs in the analysis and design process are discussed.
High performance techniques for space mission scheduling
NASA Technical Reports Server (NTRS)
Smith, Stephen F.
1994-01-01
In this paper, we summarize current research at Carnegie Mellon University aimed at development of high performance techniques and tools for space mission scheduling. Similar to prior research in opportunistic scheduling, our approach assumes the use of dynamic analysis of problem constraints as a basis for heuristic focusing of problem solving search. This methodology, however, is grounded in representational assumptions more akin to those adopted in recent temporal planning research, and in a problem solving framework which similarly emphasizes constraint posting in an explicitly maintained solution constraint network. These more general representational assumptions are necessitated by the predominance of state-dependent constraints in space mission planning domains, and the consequent need to integrate resource allocation and plan synthesis processes. First, we review the space mission problems we have considered to date and indicate the results obtained in these application domains. Next, we summarize recent work in constraint posting scheduling procedures, which offer the promise of better future solutions to this class of problems.
Periodic motion planning and control for underactuated mechanical systems
NASA Astrophysics Data System (ADS)
Wang, Zeguo; Freidovich, Leonid B.; Zhang, Honghua
2018-06-01
We consider the problem of periodic motion planning and of designing stabilising feedback control laws for such motions in underactuated mechanical systems. A novel periodic motion planning method is proposed. Each state is parametrised by a truncated Fourier series. Then we use numerical optimisation to search for the parameters of the trigonometric polynomial exploiting the measure of discrepancy in satisfying the passive dynamics equations as a performance index. Thus an almost feasible periodic motion is found. Then a linear controller is designed and stability analysis is given to verify that solutions of the closed-loop system stay inside a tube around the planned approximately feasible periodic trajectory. Experimental results for a double rotary pendulum are shown, while numerical simulations are given for models of a spacecraft with liquid sloshing and of a chain of mass spring system.
[Life cycle assessment of the infrastructure for hydrogen sources of fuel cell vehicles].
Feng, Wen; Wang, Shujuan; Ni, Weidou; Chen, Changhe
2003-05-01
In order to promote the application of life cycle assessment and provide references for China to make the project of infrastructure for hydrogen sources of fuel cell vehicles in the near future, 10 feasible plans of infrastructure for hydrogen sources of fuel cell vehicles were designed according to the current technologies of producing, storing and transporting hydrogen. Then life cycle assessment was used as a tool to evaluate the environmental performances of the 10 plans. The standard indexes of classified environmental impacts of every plan were gotten and sensitivity analysis for several parameters were carried out. The results showed that the best plan was that hydrogen will be produced by natural gas steam reforming in central factory, then transported to refuelling stations through pipelines, and filled to fuel cell vehicles using hydrogen gas at last.
Price, Margaux M; Crumley-Branyon, Jessica J; Leidheiser, William R; Pak, Richard
2016-06-01
Technology gains have improved tools for evaluating complex tasks by providing environmental supports (ES) that increase ease of use and improve performance outcomes through the use of information visualizations (info-vis). Complex info-vis emphasize the need to understand individual differences in abilities of target users, the key cognitive abilities needed to execute a decision task, and the graphical elements that can serve as the most effective ES. Older adults may be one such target user group that would benefit from increased ES to mitigate specific declines in cognitive abilities. For example, choosing a prescription drug plan is a necessary and complex task that can impact quality of life if the wrong choice is made. The decision to enroll in one plan over another can involve comparing over 15 plans across many categories. Within this context, the large amount of complex information and reduced working memory capacity puts older adults' decision making at a disadvantage. An intentionally designed ES, such as an info-vis that reduces working memory demand, may assist older adults in making the most effective decision among many options. The objective of this study is to examine whether the use of an info-vis can lower working memory demands and positively affect complex decision-making performance of older adults in the context of choosing a Medicare prescription drug plan. Participants performed a computerized decision-making task in the context of finding the best health care plan. Data included quantitative decision-making performance indicators and surveys examining previous history with purchasing insurance. Participants used a colored info-vis ES or a table (no ES) to perform the decision task. Task difficulty was manipulated by increasing the number of selection criteria used to make an accurate decision. A repeated measures analysis was performed to examine differences between the two table designs. Twenty-three older adults between the ages of 66 and 80 completed the study. There was a main effect for accuracy such that older adults made more accurate decisions in the color info-vis condition than the table condition. In the low difficulty condition, participants were more successful at choosing the correct answer when the question was about the gap coverage attribute in the info-vis condition. Participants also made significantly faster decisions in the info-vis condition than in the table condition. Reducing the working memory demand of the task through the use of an ES can improve decision accuracy, especially when selection criteria is only focused on a single attribute of the insurance plan.
Wright, Gavin; Harrold, Natalie; Bownes, Peter
2018-01-01
Aims To compare the accuracies of the convolution and TMR10 Gamma Knife treatment planning algorithms, and assess the impact upon clinical practice of implementing convolution-based treatment planning. Methods Doses calculated by both algorithms were compared against ionisation chamber measurements in homogeneous and heterogeneous phantoms. Relative dose distributions calculated by both algorithms were compared against film-derived 2D isodose plots in a heterogeneous phantom, with distance-to-agreement (DTA) measured at the 80%, 50% and 20% isodose levels. A retrospective planning study compared 19 clinically acceptable metastasis convolution plans against TMR10 plans with matched shot times, allowing novel comparison of true dosimetric parameters rather than total beam-on-time. Gamma analysis and dose-difference analysis were performed on each pair of dose distributions. Results Both algorithms matched point dose measurement within ±1.1% in homogeneous conditions. Convolution provided superior point-dose accuracy in the heterogeneous phantom (-1.1% v 4.0%), with no discernible differences in relative dose distribution accuracy. In our study convolution-calculated plans yielded D99% 6.4% (95% CI:5.5%-7.3%,p<0.001) less than shot matched TMR10 plans. For gamma passing criteria 1%/1mm, 16% of targets had passing rates >95%. The range of dose differences in the targets was 0.2-4.6Gy. Conclusions Convolution provides superior accuracy versus TMR10 in heterogeneous conditions. Implementing convolution would result in increased target doses therefore its implementation may require a revaluation of prescription doses. PMID:29657896
Aubin, Ginette; Béliveau, Marie-France; Klinger, Evelyne
2018-07-01
People with schizophrenia often have functional limitations that affect their daily activities due to executive function deficits. One way to assess these deficits is through the use of virtual reality programmes that reproduce real-life instrumental activities of daily living (IADLs). One such programme is the Virtual Action Planning-Supermarket (VAP-S). This exploratory study aimed to examine the ecological validity of this programme, specifically, how task performance in both virtual and natural environments compares. Case studies were used and involved five participants with schizophrenia, who were familiar with grocery shopping. They were assessed during both the VAP-S shopping task and a real-life grocery shopping task using an observational assessment tool, the Perceive, Recall, Plan and Perform (PRPP) System of Task Analysis. The results show that when difficulties were present in the virtual task, difficulties were also observed in the real-life task. For some participants, greater difficulties were observed in the virtual task. These difficulties could be explained by the presence of perceptual deficits and problems remembering the required sequenced actions in the virtual task. In conclusion, performance on the VAP-S by these five participants was generally comparable to the performance in a natural environment.
QUAD+ BWR Fuel Assembly demonstration program at Browns Ferry plant
DOE Office of Scientific and Technical Information (OSTI.GOV)
Doshi, P.K.; Mayhue, L.T.; Robert, J.T.
1984-04-01
The QUAD+ fuel assembly is an improved BWR fuel assembly designed and manufactured by Westinghouse Electric Corporation. The design features a water cross separating four fuel minibundles in an integral channel. A demonstration program for this fuel design is planned for late 1984 in cycle 6 of Browns Ferry 2, a TVA plant. Objectives for the design of the QUAD+ demonstration assemblies are compatibility in performance and transparency in safety analysis with the feed fuel. These objectives are met. Inspections of the QUAD+ demonstration assemblies are planned at each refueling outage.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Li, Taoran, E-mail: taoran.li.duke@gmail.com; Wu, Qiuwen; Yang, Yun
Purpose: An important challenge facing online adaptive radiation therapy is the development of feasible and efficient quality assurance (QA). This project aimed to validate the deliverability of online adapted plans and develop a proof-of-concept online delivery monitoring system for online adaptive radiation therapy QA. Methods: The first part of this project benchmarked automatically online adapted prostate treatment plans using traditional portal dosimetry IMRT QA. The portal dosimetry QA results of online adapted plans were compared to original (unadapted) plans as well as randomly selected prostate IMRT plans from our clinic. In the second part, an online delivery monitoring system wasmore » designed and validated via a simulated treatment with intentional multileaf collimator (MLC) errors. This system was based on inputs from the dynamic machine information (DMI), which continuously reports actual MLC positions and machine monitor units (MUs) at intervals of 50 ms or less during delivery. Based on the DMI, the system performed two levels of monitoring/verification during the delivery: (1) dynamic monitoring of cumulative fluence errors resulting from leaf position deviations and visualization using fluence error maps (FEMs); and (2) verification of MLC positions against the treatment plan for potential errors in MLC motion and data transfer at each control point. Validation of the online delivery monitoring system was performed by introducing intentional systematic MLC errors (ranging from 0.5 to 2 mm) to the DMI files for both leaf banks. These DMI files were analyzed by the proposed system to evaluate the system’s performance in quantifying errors and revealing the source of errors, as well as to understand patterns in the FEMs. In addition, FEMs from 210 actual prostate IMRT beams were analyzed using the proposed system to further validate its ability to catch and identify errors, as well as establish error magnitude baselines for prostate IMRT delivery. Results: Online adapted plans were found to have similar delivery accuracy in comparison to clinical IMRT plans when validated with portal dosimetry IMRT QA. FEMs for the simulated deliveries with intentional MLC errors exhibited distinct patterns for different MLC error magnitudes and directions, indicating that the proposed delivery monitoring system is highly specific in detecting the source of errors. Implementing the proposed QA system for online adapted plans revealed excellent delivery accuracy: over 99% of leaf position differences were within 0.5 mm, and >99% of pixels in the FEMs had fluence errors within 0.5 MU. Patterns present in the FEMs and MLC control point analysis for actual patient cases agreed with the error pattern analysis results, further validating the system’s ability to reveal and differentiate MLC deviations. Calculation of the fluence map based on the DMI was performed within 2 ms after receiving each DMI input. Conclusions: The proposed online delivery monitoring system requires minimal additional resources and time commitment to the current clinical workflow while still maintaining high sensitivity to leaf position errors and specificity to error types. The presented online delivery monitoring system therefore represents a promising QA system candidate for online adaptive radiation therapy.« less
Li, Taoran; Wu, Qiuwen; Yang, Yun; Rodrigues, Anna; Yin, Fang-Fang; Jackie Wu, Q
2015-01-01
An important challenge facing online adaptive radiation therapy is the development of feasible and efficient quality assurance (QA). This project aimed to validate the deliverability of online adapted plans and develop a proof-of-concept online delivery monitoring system for online adaptive radiation therapy QA. The first part of this project benchmarked automatically online adapted prostate treatment plans using traditional portal dosimetry IMRT QA. The portal dosimetry QA results of online adapted plans were compared to original (unadapted) plans as well as randomly selected prostate IMRT plans from our clinic. In the second part, an online delivery monitoring system was designed and validated via a simulated treatment with intentional multileaf collimator (MLC) errors. This system was based on inputs from the dynamic machine information (DMI), which continuously reports actual MLC positions and machine monitor units (MUs) at intervals of 50 ms or less during delivery. Based on the DMI, the system performed two levels of monitoring/verification during the delivery: (1) dynamic monitoring of cumulative fluence errors resulting from leaf position deviations and visualization using fluence error maps (FEMs); and (2) verification of MLC positions against the treatment plan for potential errors in MLC motion and data transfer at each control point. Validation of the online delivery monitoring system was performed by introducing intentional systematic MLC errors (ranging from 0.5 to 2 mm) to the DMI files for both leaf banks. These DMI files were analyzed by the proposed system to evaluate the system's performance in quantifying errors and revealing the source of errors, as well as to understand patterns in the FEMs. In addition, FEMs from 210 actual prostate IMRT beams were analyzed using the proposed system to further validate its ability to catch and identify errors, as well as establish error magnitude baselines for prostate IMRT delivery. Online adapted plans were found to have similar delivery accuracy in comparison to clinical IMRT plans when validated with portal dosimetry IMRT QA. FEMs for the simulated deliveries with intentional MLC errors exhibited distinct patterns for different MLC error magnitudes and directions, indicating that the proposed delivery monitoring system is highly specific in detecting the source of errors. Implementing the proposed QA system for online adapted plans revealed excellent delivery accuracy: over 99% of leaf position differences were within 0.5 mm, and >99% of pixels in the FEMs had fluence errors within 0.5 MU. Patterns present in the FEMs and MLC control point analysis for actual patient cases agreed with the error pattern analysis results, further validating the system's ability to reveal and differentiate MLC deviations. Calculation of the fluence map based on the DMI was performed within 2 ms after receiving each DMI input. The proposed online delivery monitoring system requires minimal additional resources and time commitment to the current clinical workflow while still maintaining high sensitivity to leaf position errors and specificity to error types. The presented online delivery monitoring system therefore represents a promising QA system candidate for online adaptive radiation therapy.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Olch, A
2015-06-15
Purpose: Systematic radiotherapy plan quality assessment promotes quality improvement. Software tools can perform this analysis by applying site-specific structure dose metrics. The next step is to similarly evaluate the quality of the dose delivery. This study defines metrics for acceptable doses to targets and normal organs for a particular treatment site and scores each plan accordingly. The input can be the TPS or the measurement-based 3D patient dose. From this analysis, one can determine whether the delivered dose distribution to the patient receives a score which is comparable to the TPS plan score, otherwise replanning may be indicated. Methods: Elevenmore » neuroblastoma patient plans were exported from Eclipse to the Quality Reports program. A scoring algorithm defined a score for each normal and target structure based on dose-volume parameters. Each plan was scored by this algorithm and the percentage of total possible points was obtained. Each plan also underwent IMRT QA measurements with a Mapcheck2 or ArcCheck. These measurements were input into the 3DVH program to compute the patient 3D dose distribution which was analyzed using the same scoring algorithm as the TPS plan. Results: The mean quality score for the TPS plans was 75.37% (std dev=14.15%) compared to 71.95% (std dev=13.45%) for the 3DVH dose distribution. For 3/11 plans, the 3DVH-based quality score was higher than the TPS score, by between 0.5 to 8.4 percentage points. Eight/11 plans scores decreased based on IMRT QA measurements by 1.2 to 18.6 points. Conclusion: Software was used to determine the degree to which the plan quality score differed between the TPS and measurement-based dose. Although the delivery score was generally in good agreement with the planned dose score, there were some that improved while there was one plan whose delivered dose quality was significantly less than planned. This methodology helps evaluate both planned and delivered dose quality. Sun Nuclear Corporation has provded a license for the software described.« less
Cost sharing and HEDIS performance.
Chernew, Michael; Gibson, Teresa B
2008-12-01
Physicians, health plans, and health systems are increasingly evaluated and rewarded based on Health Plan Effectiveness Data and Information Set (HEDIS) and HEDIS-like performance measures. Concurrently, employers and health plans continue to try to control expenditures by increasing out-of-pocket costs for patients. The authors use fixed-effect logit models to assess how rising copayment rates for physician office visits and prescription drugs affect performance on HEDIS measures. Findings suggest that the increase in copayment rates lowers performance scores, demonstrating the connection between financial aspects of plan design and quality performance, and highlighting the potential weakness of holding plans and providers responsible for performance when payers and benefit plan managers also influence performance. Yet the effects are not consistent across all domains and, in many cases, are relatively modest in magnitude. This may reflect the HEDIS definitions and suggests that more sensitive measures may capture the impact of benefit design changes on performance.
Bertollo, Maurizio; Bortoli, Laura; Gramaccioni, Gianfranco; Hanin, Yuri; Comani, Silvia; Robazza, Claudio
2013-06-01
The main purposes of the present study were to substantiate the existence of the four types of performance categories (i.e., optimal-automatic, optimal-controlled, suboptimal-controlled, and suboptimal-automatic) as hypothesised in the multi-action plan (MAP) model, and to investigate whether some specific affective, behavioural, psychophysiological, and postural trends may typify each type of performance. A 20-year-old athlete of the Italian shooting team, and a 46-year-old athlete of the Italian dart-throwing team participated in the study. Athletes were asked to identify the core components of the action and then to execute a large number of shots/flights. A 2 × 2 (optimal/suboptimal × automated/controlled) within subjects multivariate analysis of variance was performed to test the differences among the four types of performance. Findings provided preliminary evidence of psychophysiological and postural differences among four performance categories as conceptualized within the MAP model. Monitoring the entire spectrum of psychophysiological and behavioural features related to the different types of performance is important to develop and implement biofeedback and neurofeedback techniques aimed at helping athletes to identify individual zones of optimal functioning and to enhance their performance.
Options to improve energy efficiency for educational building
NASA Astrophysics Data System (ADS)
Jahan, Mafruha
The cost of energy is a major factor that must be considered for educational facility budget planning purpose. The analysis of energy related issues and options can be complex and requires significant time and detailed effort. One way to facilitate the inclusion of energy option planning in facility planning efforts is to utilize a tool that allows for quick appraisal of the facility energy profile. Once such an appraisal is accomplished, it is then possible to rank energy improvement options consistently with other facility needs and requirements. After an energy efficiency option has been determined to have meaningful value in comparison with other facility planning options, it is then possible to utilize the initial appraisal as the basis for an expanded consideration of additional facility and energy use detail using the same analytic system used for the initial appraisal. This thesis has developed a methodology and an associated analytic model to assist in these tasks and thereby improve the energy efficiency of educational facilities. A detailed energy efficiency and analysis tool is described that utilizes specific university building characteristics such as size, architecture, envelop, lighting, occupancy, thermal design which allows reducing the annual energy consumption. Improving the energy efficiency of various aspects of an educational building's energy performance can be complex and can require significant time and experience to make decisions. The approach developed in this thesis initially assesses the energy design for a university building. This initial appraisal is intended to assist administrators in assessing the potential value of energy efficiency options for their particular facility. Subsequently this scoping design can then be extended as another stage of the model by local facility or planning personnel to add more details and engineering aspects to the initial screening model. This approach can assist university planning efforts to identify the most cost effective combinations of energy efficiency strategies. The model analyzes and compares the payback periods of all proposed Energy Performance Measures (EPMs) to determine which has the greatest potential value.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Saleh, H; Ferjani, S; Masssey, V
Purpose: Perform dosimetric comparison between planned and delivered dose in the junction area, measure daily dose variation in the arc junction area for pediatric patients treated for medulloblastoma using Craniospinal axis irradiation(CSI) Material and methods Dose comparison in the junction area, daily dose variation in the arc junction area for a Rando Phantom and 5 pediatric patients treated using CSI technique were analyzed. Plans were created using the Eclipse treatment planning system. Two arcs for cranium and 1 arc for spine region were used. Planar dose matrix was created by projecting phantom and patient plan into the ArcCheck phantom. EBT3more » film was placed in the middle of ArcCheck plug to measure dose distribution in the junction areaDuring patient treatment, strip of EBT3 film was placed daily at each junction area for verification. EBT3 films were scanned using a flatbed scanner, Epson Expression 10000 XL. Film QA pro software was used to analyze film. Scanning and analysis was performed according to vendor recommendations and AAPM TG-55 report. Films were scanned and analyzed daily after each treatment and at the end of treatment course. Planar dose distributions from films were compared with planar dose distribution from treatment planning system. Results: Comparison of planned vs. measured dose distributions for patients have passing rates of 90%–100% with 3% and 3 mm gamma analysis. In some of the treatment fractions, daily setup film showed variation in dose distribution in the junction area. Conclusion: It is critical to measure dose distribution in the arc junction area and use additional quality assurance measures to verify daily setup for CSI patient where one or more junctions are present. EBT3 film prove to be a good tool to achieve this task considering flexibility associated with the film such as symmetry, self-developing and ease of use.« less
Osman, Ibrahim H; Berbary, Lynn N; Sidani, Yusuf; Al-Ayoubi, Baydaa; Emrouznejad, Ali
2011-10-01
The appraisal and relative performance evaluation of nurses are very important and beneficial for both nurses and employers in an era of clinical governance, increased accountability and high standards of health care services. They enhance and consolidate the knowledge and practical skills of nurses by identification of training and career development plans as well as improvement in health care quality services, increase in job satisfaction and use of cost-effective resources. In this paper, a data envelopment analysis (DEA) model is proposed for the appraisal and relative performance evaluation of nurses. The model is validated on thirty-two nurses working at an Intensive Care Unit (ICU) at one of the most recognized hospitals in Lebanon. The DEA was able to classify nurses into efficient and inefficient ones. The set of efficient nurses was used to establish an internal best practice benchmark to project career development plans for improving the performance of other inefficient nurses. The DEA result confirmed the ranking of some nurses and highlighted injustice in other cases that were produced by the currently practiced appraisal system. Further, the DEA model is shown to be an effective talent management and motivational tool as it can provide clear managerial plans related to promoting, training and development activities from the perspective of nurses, hence increasing their satisfaction, motivation and acceptance of appraisal results. Due to such features, the model is currently being considered for implementation at ICU. Finally, the ratio of the number DEA units to the number of input/output measures is revisited with new suggested values on its upper and lower limits depending on the type of DEA models and the desired number of efficient units from a managerial perspective.
Maurer, Max; Lienert, Judit
2017-01-01
We compare the use of multi-criteria decision analysis (MCDA)–or more precisely, models used in multi-attribute value theory (MAVT)–to integrated assessment (IA) models for supporting long-term water supply planning in a small town case study in Switzerland. They are used to evaluate thirteen system scale water supply alternatives in four future scenarios regarding forty-four objectives, covering technical, social, environmental, and economic aspects. The alternatives encompass both conventional and unconventional solutions and differ regarding technical, spatial and organizational characteristics. This paper focuses on the impact assessment and final evaluation step of the structured MCDA decision support process. We analyze the performance of the alternatives for ten stakeholders. We demonstrate the implications of model assumptions by comparing two IA and three MAVT evaluation model layouts of different complexity. For this comparison, we focus on the validity (ranking stability), desirability (value), and distinguishability (value range) of the alternatives given the five model layouts. These layouts exclude or include stakeholder preferences and uncertainties. Even though all five led us to identify the same best alternatives, they did not produce identical rankings. We found that the MAVT-type models provide higher distinguishability and a more robust basis for discussion than the IA-type models. The needed complexity of the model, however, should be determined based on the intended use of the model within the decision support process. The best-performing alternatives had consistently strong performance for all stakeholders and future scenarios, whereas the current water supply system was outperformed in all evaluation layouts. The best-performing alternatives comprise proactive pipe rehabilitation, adapted firefighting provisions, and decentralized water storage and/or treatment. We present recommendations for possible ways of improving water supply planning in the case study and beyond. PMID:28481881
Developing Air Defense Artillery Warrant Officers Cognitive Skills: An Analysis of Training Needs
2018-02-01
statement of actions, conditions, and standards. The lesson descriptions were compared to the action verbs used in the lesson action text and standards...performance and compared these findings to the training WOs receive in formal courses during their career progression. Findings indicated differing...are all required cognitive skills for ADA WOs, decision- making and planning skills are the most prevalent. A comparative analysis identified three
Minimizing treatment planning errors in proton therapy using failure mode and effects analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zheng, Yuanshui, E-mail: yuanshui.zheng@okc.procure.com; Johnson, Randall; Larson, Gary
Purpose: Failure mode and effects analysis (FMEA) is a widely used tool to evaluate safety or reliability in conventional photon radiation therapy. However, reports about FMEA application in proton therapy are scarce. The purpose of this study is to apply FMEA in safety improvement of proton treatment planning at their center. Methods: The authors performed an FMEA analysis of their proton therapy treatment planning process using uniform scanning proton beams. The authors identified possible failure modes in various planning processes, including image fusion, contouring, beam arrangement, dose calculation, plan export, documents, billing, and so on. For each error, the authorsmore » estimated the frequency of occurrence, the likelihood of being undetected, and the severity of the error if it went undetected and calculated the risk priority number (RPN). The FMEA results were used to design their quality management program. In addition, the authors created a database to track the identified dosimetric errors. Periodically, the authors reevaluated the risk of errors by reviewing the internal error database and improved their quality assurance program as needed. Results: In total, the authors identified over 36 possible treatment planning related failure modes and estimated the associated occurrence, detectability, and severity to calculate the overall risk priority number. Based on the FMEA, the authors implemented various safety improvement procedures into their practice, such as education, peer review, and automatic check tools. The ongoing error tracking database provided realistic data on the frequency of occurrence with which to reevaluate the RPNs for various failure modes. Conclusions: The FMEA technique provides a systematic method for identifying and evaluating potential errors in proton treatment planning before they result in an error in patient dose delivery. The application of FMEA framework and the implementation of an ongoing error tracking system at their clinic have proven to be useful in error reduction in proton treatment planning, thus improving the effectiveness and safety of proton therapy.« less
Minimizing treatment planning errors in proton therapy using failure mode and effects analysis.
Zheng, Yuanshui; Johnson, Randall; Larson, Gary
2016-06-01
Failure mode and effects analysis (FMEA) is a widely used tool to evaluate safety or reliability in conventional photon radiation therapy. However, reports about FMEA application in proton therapy are scarce. The purpose of this study is to apply FMEA in safety improvement of proton treatment planning at their center. The authors performed an FMEA analysis of their proton therapy treatment planning process using uniform scanning proton beams. The authors identified possible failure modes in various planning processes, including image fusion, contouring, beam arrangement, dose calculation, plan export, documents, billing, and so on. For each error, the authors estimated the frequency of occurrence, the likelihood of being undetected, and the severity of the error if it went undetected and calculated the risk priority number (RPN). The FMEA results were used to design their quality management program. In addition, the authors created a database to track the identified dosimetric errors. Periodically, the authors reevaluated the risk of errors by reviewing the internal error database and improved their quality assurance program as needed. In total, the authors identified over 36 possible treatment planning related failure modes and estimated the associated occurrence, detectability, and severity to calculate the overall risk priority number. Based on the FMEA, the authors implemented various safety improvement procedures into their practice, such as education, peer review, and automatic check tools. The ongoing error tracking database provided realistic data on the frequency of occurrence with which to reevaluate the RPNs for various failure modes. The FMEA technique provides a systematic method for identifying and evaluating potential errors in proton treatment planning before they result in an error in patient dose delivery. The application of FMEA framework and the implementation of an ongoing error tracking system at their clinic have proven to be useful in error reduction in proton treatment planning, thus improving the effectiveness and safety of proton therapy.
NASA Astrophysics Data System (ADS)
Do, Sydney; Owens, Andrew; Ho, Koki; Schreiner, Samuel; de Weck, Olivier
2016-03-01
In recent years, the Mars One program has gained significant publicity for its plans to colonize the red planet. Beginning in 2025, the program plans to land four people on Mars every 26 months via a series of one-way missions, using exclusively existing technology. This one-way approach has frequently been cited as a key enabler of accelerating the first crewed landing on Mars. While the Mars One program has received considerable attention, little has been published in the technical literature regarding the formulation of its mission architecture. In light of this, we perform an independent analysis of the technical feasibility of the Mars One mission plan, focusing on the architecture of the life support and in-situ resource utilization (ISRU) systems, and their impact on sparing and space logistics. To perform this analysis, we adopt an iterative analysis approach in which we model and simulate the mission architecture, assess its feasibility, implement any applicable modifications while attempting to remain within the constraints set forth by Mars One, and then resimulate and reanalyze the revised version of the mission architecture. Where required information regarding the Mars One mission architecture is not available, we assume numerical values derived from standard spaceflight design handbooks and documents. Through four iterations of this process, our analysis finds that the Mars One mission plan, as publicly described, is not feasible. This conclusion is obtained from analyses based on mission assumptions derived from and constrained by statements made by Mars One, and is the result of the following findings: (1) several technologies including ISRU, life support, and entry, descent, and landing (EDL) are not currently "existing, validated and available" as claimed by Mars One; (2) the crop growth area described by Mars One is insufficient to feed their crew; (3) increasing the crop growth area to provide sufficient food for the crew leads to atmospheric imbalances that requires a prohibitively large ISRU atmospheric processor or a notably different system architecture to manage; and (4) at least 13 Falcon Heavy launches are needed to deliver a portion of the required equipment to the Martian surface, a value that is at least double that planned by Mars One for the same mission phase. Most importantly, we find that the one-way nature of the Mars One mission, coupled with its plans to increase its crew population every 26 months, causes the operating costs of the program to grow continually over time. This is due to the fact that maintaining a growing colony on the Martian surface incurs increasing equipment and spare parts resupply requirements and hence launch costs over time. Based on published launch vehicle and lander estimates, our analysis finds that by the launch of the fifth crew, the cost associated with launching a portion of all required equipment and spares is approximately equal to half of the total NASA FY2015 budget - and this cost will grow when other critical systems outside the scope of this analysis are included. To mitigate these costs and bring the plan closer towards feasibility, we recommend a number of mission architecture modifications and technology development efforts be implemented before the initiation of any Mars settlement campaign. These include the further development of EDL, life support, and ISRU technologies, as well as additive manufacturing technology that utilizes ISRU-derived Martian feedstock as a potential means to address the growing cost of resupply.
Modulation indices for volumetric modulated arc therapy.
Park, Jong Min; Park, So-Yeon; Kim, Hyoungnyoun; Kim, Jin Ho; Carlson, Joel; Ye, Sung-Joon
2014-12-07
The aim of this study is to present a modulation index (MI) for volumetric modulated arc therapy (VMAT) based on the speed and acceleration analysis of modulating-parameters such as multi-leaf collimator (MLC) movements, gantry rotation and dose-rate, comprehensively. The performance of the presented MI (MIt) was evaluated with correlation analyses to the pre-treatment quality assurance (QA) results, differences in modulating-parameters between VMAT plans versus dynamic log files, and differences in dose-volumetric parameters between VMAT plans versus reconstructed plans using dynamic log files. For comparison, the same correlation analyses were performed for the previously suggested modulation complexity score (MCS(v)), leaf travel modulation complexity score (LTMCS) and MI by Li and Xing (MI Li&Xing). In the two-tailed unpaired parameter condition, p values were acquired. The Spearman's rho (r(s)) values of MIt, MCSv, LTMCS and MI Li&Xing to the local gamma passing rate with 2%/2 mm criterion were -0.658 (p < 0.001), 0.186 (p = 0.251), 0.312 (p = 0.05) and -0.455 (p = 0.003), respectively. The values of rs to the modulating-parameter (MLC positions) differences were 0.917, -0.635, -0.857 and 0.795, respectively (p < 0.001). For dose-volumetric parameters, MIt showed higher statistically significant correlations than the conventional MIs. The MIt showed good performance for the evaluation of the modulation-degree of VMAT plans.
Realtime Decision Making on EO-1 Using Onboard Science Analysis
NASA Technical Reports Server (NTRS)
Sherwood, Robert; Chien, Steve; Davies, Ashley; Mandl, Dan; Frye, Stu
2004-01-01
Recent autonomy experiments conducted on Earth Observing 1 (EO-1) using the Autonomous Sciencecraft Experiment (ASE) flight software has been used to classify key features in hyperspectral images captured by EO-1. Furthermore, analysis is performed by this software onboard EO-1 and then used to modify the operational plan without interaction from the ground. This paper will outline the overall operations concept and provide some details and examples of the onboard science processing, science analysis, and replanning.
NASA Astrophysics Data System (ADS)
Martino, P.
1980-12-01
A general methodology is presented for conducting an analysis of the various aspects of the hazards associated with the storage and transportation of liquefied natural gas (LNG) which should be considered during the planning stages of a typical LNG ship terminal. The procedure includes the performance of a hazards and system analysis of the proposed site, a probability analysis of accident scenarios and safety impacts, an analysis of the consequences of credible accidents such as tanker accidents, spills and fires, the assessment of risks and the design and evaluation of risk mitigation measures.
Sjölin, Maria; Edmund, Jens Morgenthaler
2016-07-01
Dynamic treatment planning algorithms use a dosimetric leaf separation (DLS) parameter to model the multi-leaf collimator (MLC) characteristics. Here, we quantify the dosimetric impact of an incorrect DLS parameter and investigate whether common pretreatment quality assurance (QA) methods can detect this effect. 16 treatment plans with intensity modulated radiation therapy (IMRT) or volumetric modulated arc therapy (VMAT) technique for multiple treatment sites were calculated with a correct and incorrect setting of the DLS, corresponding to a MLC gap difference of 0.5mm. Pretreatment verification QA was performed with a bi-planar diode array phantom and the electronic portal imaging device (EPID). Measurements were compared to the correct and incorrect planned doses using gamma evaluation with both global (G) and local (L) normalization. Correlation, specificity and sensitivity between the dose volume histogram (DVH) points for the planning target volume (PTV) and the gamma passing rates were calculated. The change in PTV and organs at risk DVH parameters were 0.4-4.1%. Good correlation (>0.83) between the PTVmean dose deviation and measured gamma passing rates was observed. Optimal gamma settings with 3%L/3mm (per beam and composite plan) and 3%G/2mm (composite plan) for the diode array phantom and 2%G/2mm (composite plan) for the EPID system were found. Global normalization and per beam ROC analysis of the diode array phantom showed an area under the curve <0.6. A DLS error can worsen pretreatment QA using gamma analysis with reasonable credibility for the composite plan. A low detectability was demonstrated for a 3%G/3mm per beam gamma setting. Copyright © 2016 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.
5 CFR 430.305 - Planning and communicating performance.
Code of Federal Regulations, 2011 CFR
2011-01-01
.... 430.305 Section 430.305 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERFORMANCE MANAGEMENT Managing Senior Executive Performance § 430.305 Planning and communicating... strategic planning initiatives. Critical elements and performance requirements for each senior executive...
5 CFR 430.305 - Planning and communicating performance.
Code of Federal Regulations, 2010 CFR
2010-01-01
.... 430.305 Section 430.305 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERFORMANCE MANAGEMENT Managing Senior Executive Performance § 430.305 Planning and communicating... strategic planning initiatives. Critical elements and performance requirements for each senior executive...
NASA Astrophysics Data System (ADS)
Aziz, Wan Noor Hayatie Wan Abdul; Aziz, Rossidah Wan Abdul; Shuib, Adibah; Razi, Nor Faezah Mohamad
2014-06-01
Budget planning enables an organization to set priorities towards achieving certain goals and to identify the highest priorities to be accomplished with the available funds, thus allowing allocation of resources according to the set priorities and constraints. On the other hand, budget execution and monitoring enables allocated funds or resources to be utilized as planned. Our study concerns with investigating the relationship between budget allocation and budget utilization of faculties in a public university in Malaysia. The focus is on the university's operations management financial allocation and utilization based on five categories which are emolument expenditure, academic or services and supplies expenditure, maintenance expenditure, student expenditure and others expenditure. The analysis on financial allocation and utilization is performed based on yearly quarters. Data collected include three years faculties' budget allocation and budget utilization performance involving a sample of ten selected faculties of a public university in Malaysia. Results show that there are positive correlation and significant relationship between quarterly budget allocation and quarterly budget utilization. This study found that emolument give the highest contribution to the total allocation and total utilization for all quarters. This paper presents some findings based on statistical analysis conducted which include descriptive statistics and correlation analysis.
NASA Technical Reports Server (NTRS)
Oum, Tae Hoon (Editor); Bowen, Brent D. (Editor)
1998-01-01
Contents include the following: Airport choice in a multiple airport region: an empirical analysis for the San Francisco bay area. Liberalization of the westeuropian aviation: choice of a new hub airport for an airline. Austin Bergstrom airport traffic control tower establishment of a major activity level tower. A study to optimize the environmental capacity of Amsterdam airport schiphol.Airport performance in stakeholder involvement and communication strategies: a comparison of major Australian and North American air carrier and general aviation airports. Airport planning and location.Location of international airport and regional development. A simulation technique for analysis of Brasilian airport passanger terminal building.Multimodal airport access in Japan. Planning surface access provision at major airports Airline economics and the inclusion of environmental costs on airport hub pricing: a theoretical analysis. Airport financing and user charge systems in the USA. Optimal demand for operating lease of aircraft. Aircraft leasing industry and social welfare.The development of performance indicators for airports: a management perspective. Study about operational effect of the "security check-in" implantation in Brasilian international airports.Austin Bergstrom west loop cable system.and Optimal resource allocation model for airport passanger terminals.
Role of the cerebellum in high stages of motor planning hierarchy
Federici, Alessandra; Cesareo, Ambra; Biffi, Emilia; Valtorta, Giulia; Molteni, Massimo; Ronconi, Luca; Borgatti, Renato
2017-01-01
Motor planning is not a monolithic process, and distinct stages of motor planning are responsible for encoding different levels of abstractness. However, how these distinct components are mapped into different neural substrates remains an open question. We studied one of these high-level motor planning components, defined as second-order motor planning, in a patient (R.G.) with an extremely rare case of cerebellar agenesis but without any other cortical malformations. Second-order motor planning dictates that when two acts must be performed sequentially, planning of the second act can influence execution of the first. We used an optoelectronic system for kinematic analysis to compare R.G.’s performance with age-matched controls in a second-order motor planning task. The first act was to reach for an object, and the second was to place it into a small or large container. Our results showed that despite the expected difficulties in fine-motor skills, second-order motor planning (i.e., the ability to modulate the first act as a function of the nature of the second act) was preserved even in the patient with congenital absence of the cerebellum. These results open new intriguing speculations about the role of the cerebellum in motor planning abilities. Although prudence is imperative when suggesting conclusions made on the basis of single-case findings, this evidence suggests fascinating hypotheses about the neural circuits that support distinct stages of the motor planning hierarchy, and regarding the functional role of second-order motor planning in motor cognition and its potential dysfunction in autism. NEW & NOTEWORTHY Traditionally, the cerebellum was considered essential for motor planning. By studying an extremely rare patient with cerebellar agenesis and a group of neurotypical controls, we found that high stages of the motor planning hierarchy can be preserved even in this patient with congenital absence of the cerebellum. Our results provide interesting insights that shed light on the neural circuits supporting distinct levels of motor planning. Furthermore, the results are intriguing because of their potential clinical implications in autism. PMID:28077667
A cloud-based system for measuring radiation treatment plan similarity
NASA Astrophysics Data System (ADS)
Andrea, Jennifer
PURPOSE: Radiation therapy is used to treat cancer using carefully designed plans that maximize the radiation dose delivered to the target and minimize damage to healthy tissue, with the dose administered over multiple occasions. Creating treatment plans is a laborious process and presents an obstacle to more frequent replanning, which remains an unsolved problem. However, in between new plans being created, the patient's anatomy can change due to multiple factors including reduction in tumor size and loss of weight, which results in poorer patient outcomes. Cloud computing is a newer technology that is slowly being used for medical applications with promising results. The objective of this work was to design and build a system that could analyze a database of previously created treatment plans, which are stored with their associated anatomical information in studies, to find the one with the most similar anatomy to a new patient. The analyses would be performed in parallel on the cloud to decrease the computation time of finding this plan. METHODS: The system used SlicerRT, a radiation therapy toolkit for the open-source platform 3D Slicer, for its tools to perform the similarity analysis algorithm. Amazon Web Services was used for the cloud instances on which the analyses were performed, as well as for storage of the radiation therapy studies and messaging between the instances and a master local computer. A module was built in SlicerRT to provide the user with an interface to direct the system on the cloud, as well as to perform other related tasks. RESULTS: The cloud-based system out-performed previous methods of conducting the similarity analyses in terms of time, as it analyzed 100 studies in approximately 13 minutes, and produced the same similarity values as those methods. It also scaled up to larger numbers of studies to analyze in the database with a small increase in computation time of just over 2 minutes. CONCLUSION: This system successfully analyzes a large database of radiation therapy studies and finds the one that is most similar to a new patient, which represents a potential step forward in achieving feasible adaptive radiation therapy replanning.
Robinson, Emily J; Goldstein, Laura H; McCrone, Paul; Perdue, Iain; Chalder, Trudie; Mellers, John D C; Richardson, Mark P; Murray, Joanna; Reuber, Markus; Medford, Nick; Stone, Jon; Carson, Alan; Landau, Sabine
2017-06-06
Dissociative seizures (DSs), also called psychogenic non-epileptic seizures, are a distressing and disabling problem for many patients in neurological settings with high and often unnecessary economic costs. The COgnitive behavioural therapy versus standardised medical care for adults with Dissociative non-Epileptic Seizures (CODES) trial is an evaluation of a specifically tailored psychological intervention with the aims of reducing seizure frequency and severity and improving psychological well-being in adults with DS. The aim of this paper is to report in detail the quantitative and economic analysis plan for the CODES trial, as agreed by the trial steering committee. The CODES trial is a multicentre, pragmatic, parallel group, randomised controlled trial performed to evaluate the clinical effectiveness and cost-effectiveness of 13 sessions of cognitive behavioural therapy (CBT) plus standardised medical care (SMC) compared with SMC alone for adult outpatients with DS. The objectives and design of the trial are summarised, and the aims and procedures of the planned analyses are illustrated. The proposed analysis plan addresses statistical considerations such as maintaining blinding, monitoring adherence with the protocol, describing aspects of treatment and dealing with missing data. The formal analysis approach for the primary and secondary outcomes is described, as are the descriptive statistics that will be reported. This paper provides transparency to the planned inferential analyses for the CODES trial prior to the extraction of outcome data. It also provides an update to the previously published trial protocol and guidance to those conducting similar trials. ISRCTN registry ISRCTN05681227 (registered on 5 March 2014); ClinicalTrials.gov NCT02325544 (registered on 15 December 2014).
Automated geospatial Web Services composition based on geodata quality requirements
NASA Astrophysics Data System (ADS)
Cruz, Sérgio A. B.; Monteiro, Antonio M. V.; Santos, Rafael
2012-10-01
Service-Oriented Architecture and Web Services technologies improve the performance of activities involved in geospatial analysis with a distributed computing architecture. However, the design of the geospatial analysis process on this platform, by combining component Web Services, presents some open issues. The automated construction of these compositions represents an important research topic. Some approaches to solving this problem are based on AI planning methods coupled with semantic service descriptions. This work presents a new approach using AI planning methods to improve the robustness of the produced geospatial Web Services composition. For this purpose, we use semantic descriptions of geospatial data quality requirements in a rule-based form. These rules allow the semantic annotation of geospatial data and, coupled with the conditional planning method, this approach represents more precisely the situations of nonconformities with geodata quality that may occur during the execution of the Web Service composition. The service compositions produced by this method are more robust, thus improving process reliability when working with a composition of chained geospatial Web Services.
Status and Plans for NSTX-U Recovery
NASA Astrophysics Data System (ADS)
Hawryluk, R. J.; Gerhardt, S.; Menard, J.; Neumeyer, C.
2017-10-01
The NSTX-U device experienced a series of technical problems; the most recent of which was the failure of one of the poloidal magnetic field coils, which has rendered the device inoperable and in need of significant repair. As a result of these incidents, the Laboratory performed a very comprehensive analysis of all of the systems on NSTX-U. Through an integrated system's analysis approach, this process identified which actions need to be taken to form a corrective action plan to ensure reliable and predictable operation. The actions required to address the deficiencies were reviewed by external experts who made recommendations on four high-level programmatic decisions regarding the inner poloidal field coils, limitations to the required bakeout temperature needed for conditioning of the vacuum vessel, divertor and wall protection tiles and coaxial helicity injection. The plans for addressing the recommendations from the external review panels will be presented. This research was sponsored by the U.S. Dept. of Energy under contract DE-AC02-09CH11466.
42 CFR 457.710 - State plan requirements: Strategic objectives and performance goals.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) ALLOTMENTS AND GRANTS TO STATES Strategic Planning, Reporting, and Evaluation § 457.710 State plan requirements: Strategic objectives and performance goals. (a) Plan description. A State plan must include a... 42 Public Health 4 2011-10-01 2011-10-01 false State plan requirements: Strategic objectives and...
Motor Development and Skill Analysis. Connections to Elementary Physical Education.
ERIC Educational Resources Information Center
Mielke, Dan; Morrison, Craig
1985-01-01
Drawing upon stages of motor development and elements of biomechanics, the authors used anatomical planes as a frame of reference to determine movement patterns and assess readiness to perform movement skills. The combination of determining readiness and analyzing skill enables the teacher to plan proper motor skill activities. (MT)
Adult Literacy Policy and Performance in Malawi: An Analysis.
ERIC Educational Resources Information Center
Bhola, H. S.
In Malawi, adult literacy deserves immediate attention in order to promote health, family planning, and productivity. While policy commitment for adult literacy promotion has not been lacking, intensified action has been. In 1979 the government accepted the Unesco Mission Report to undertake a functional literacy program on the successful…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Higashiura, Akifumi, E-mail: hgsur-a@protein.osaka-u.ac.jp; Yamashita, Eiki; Yoshimura, Masato
2016-07-27
Beamline BL44XU at SPring-8 is operated by the Institute for Protein Research of Osaka University. The beamline is designed for X-ray crystallography of large biological macromolecular assemblies. Here we show its detailed performances, results, and the ongoing upgrade plans.
78 FR 37226 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-20
... Implementation Study. OMB No.: 0970-0398. Description: The Office of Data Analysis, Research, and Evaluation (HHS... Planning, Research, and Evaluation (HHS/ACF/OPRE) in the Administration for Children and Families (ACF... designed and implemented in the field, collect performance measure data for PREP programs, and assess the...
Designing a Standard Model for Development and Execution of an Analysis Project Plan
2012-06-01
mitigations set forth are agreeable to all parties involved. 1.3 Document Risks, Issues, and Constraints 1.1 Gather Information 1.2 Develop...parent requirement into lower level objective, performance-based sibling actions. Collective accomplishment of the set of derived “ sibling ” actions
Stormtime Magnetosphere-Ionosphere-Thermosphere Interactions and Dynamics
2013-03-13
1 2. BACKGROUND ... BACKGROUND The studies described in this report were performed in support of ongoing and planned space weather programs in the areas of Space Situational...Ionosphere The purpose of this effort was to initiate on-going analysis of COSMIC -GPS measurements of total electron content (TEC) in the dayside
42 CFR 457.710 - State plan requirements: Strategic objectives and performance goals.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... The State's strategic objectives, performance goals and performance measures must include a common... 42 Public Health 4 2010-10-01 2010-10-01 false State plan requirements: Strategic objectives and...) ALLOTMENTS AND GRANTS TO STATES Strategic Planning, Reporting, and Evaluation § 457.710 State plan...
Efficiency in Rule- vs. Plan-Based Movements Is Modulated by Action-Mode.
Scheib, Jean P P; Stoll, Sarah; Thürmer, J Lukas; Randerath, Jennifer
2018-01-01
The rule/plan motor cognition (RPMC) paradigm elicits visually indistinguishable motor outputs, resulting from either plan- or rule-based action-selection, using a combination of essentially interchangeable stimuli. Previous implementations of the RPMC paradigm have used pantomimed movements to compare plan- vs. rule-based action-selection. In the present work we attempt to determine the generalizability of previous RPMC findings to real object interaction by use of a grasp-to-rotate task. In the plan task, participants had to use prospective planning to achieve a comfortable post-handle rotation hand posture. The rule task used implementation intentions (if-then rules) leading to the same comfortable end-state. In Experiment A, we compare RPMC performance of 16 healthy participants in pantomime and real object conditions of the experiment, within-subjects. Higher processing efficiency of rule- vs. plan-based action-selection was supported by diffusion model analysis. Results show a significant response-time increase in the pantomime condition compared to the real object condition and a greater response-time advantage of rule-based vs. plan-based actions in the pantomime compared to the real object condition. In Experiment B, 24 healthy participants performed the real object RPMC task in a task switching vs. a blocked condition. Results indicate that plan-based action-selection leads to longer response-times and less efficient information processing than rule-based action-selection in line with previous RPMC findings derived from the pantomime action-mode. Particularly in the task switching mode, responses were faster in the rule compared to the plan task suggesting a modulating influence of cognitive load. Overall, results suggest an advantage of rule-based action-selection over plan-based action-selection; whereby differential mechanisms appear to be involved depending on the action-mode. We propose that cognitive load is a factor that modulates the advantageous effect of implementation intentions in motor cognition on different levels as illustrated by the varying speed advantages and the variation in diffusion parameters per action-mode or condition, respectively.
Uncovering the requirements of cognitive work.
Roth, Emilie M
2008-06-01
In this article, the author provides an overview of cognitive analysis methods and how they can be used to inform system analysis and design. Human factors has seen a shift toward modeling and support of cognitively intensive work (e.g., military command and control, medical planning and decision making, supervisory control of automated systems). Cognitive task analysis and cognitive work analysis methods extend traditional task analysis techniques to uncover the knowledge and thought processes that underlie performance in cognitively complex settings. The author reviews the multidisciplinary roots of cognitive analysis and the variety of cognitive task analysis and cognitive work analysis methods that have emerged. Cognitive analysis methods have been used successfully to guide system design, as well as development of function allocation, team structure, and training, so as to enhance performance and reduce the potential for error. A comprehensive characterization of cognitive work requires two mutually informing analyses: (a) examination of domain characteristics and constraints that define cognitive requirements and challenges and (b) examination of practitioner knowledge and strategies that underlie both expert and error-vulnerable performance. A variety of specific methods can be adapted to achieve these aims within the pragmatic constraints of particular projects. Cognitive analysis methods can be used effectively to anticipate cognitive performance problems and specify ways to improve individual and team cognitive performance (be it through new forms of training, user interfaces, or decision aids).
In-Memory Business Intelligence: Concepts and Performance
NASA Astrophysics Data System (ADS)
Rantung, V. P.; Kembuan, O.; Rompas, P. T. D.; Mewengkang, A.; Liando, O. E. S.; Sumayku, J.
2018-02-01
This research aims to discuss in-memory Business Intelligent (BI) and to model the business analysis questions to know the performance of the in-memory BI. By using, the Qlickview application found BI dashboards that easily accessed and modified. The dashboards are developed together using an agile development approach such as pre-study, planning, iterative execution, implementation, and evaluation. At the end, this research helping analyzer in choosing a right implementation for BI solution.
Rewriting History: Historical Research With the Digital Plan
2009-10-01
significant enough to warrant a change or further analysis of how cadets take notes. The simple nature of the digital pen, akin to writing with a pen on... significant . By the third week the larger the percentage of handwriting correctly recognized, the higher the performance rating for the pen. Related...the pen at all. The current data showed two significant correlations between percent of handwriting recognized and the factors of pen performance and
Damage Tolerance of Sandwich Plates With Debonded Face Sheets
NASA Technical Reports Server (NTRS)
Sankar, Bhavani V.
2001-01-01
A nonlinear finite element analysis was performed to simulate axial compression of sandwich beams with debonded face sheets. The load - end-shortening diagrams were generated for a variety of specimens used in a previous experimental study. The energy release rate at the crack tip was computed using the J-integral, and plotted as a function of the load. A detailed stress analysis was performed and the critical stresses in the face sheet and the core were computed. The core was also modeled as an isotropic elastic-perfectly plastic material and a nonlinear post buckling analysis was performed. A Graeco-Latin factorial plan was used to study the effects of debond length, face sheet and core thicknesses, and core density on the load carrying capacity of the sandwich composite. It has been found that a linear buckling analysis is inadequate in determining the maximum load a debonded sandwich beam can carry. A nonlinear post-buckling analysis combined with an elastoplastic model of the core is required to predict the compression behavior of debonded sandwich beams.
SU-F-P-07: Applying Failure Modes and Effects Analysis to Treatment Planning System QA
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mathew, D; Alaei, P
2016-06-15
Purpose: A small-scale implementation of Failure Modes and Effects Analysis (FMEA) for treatment planning system QA by utilizing methodology of AAPM TG-100 report. Methods: FMEA requires numerical values for severity (S), occurrence (O) and detectability (D) of each mode of failure. The product of these three values gives a risk priority number (RPN). We have implemented FMEA for the treatment planning system (TPS) QA for two clinics which use Pinnacle and Eclipse TPS. Quantitative monthly QA data dating back to 4 years for Pinnacle and 1 year for Eclipse have been used to determine values for severity (deviations from predeterminedmore » doses at points or volumes), and occurrence of such deviations. The TPS QA protocol includes a phantom containing solid water and lung- and bone-equivalent heterogeneities. Photon and electron plans have been evaluated in both systems. The dose values at multiple distinct points of interest (POI) within the solid water, lung, and bone-equivalent slabs, as well as mean doses to several volumes of interest (VOI), have been re-calculated monthly using the available algorithms. Results: The computed doses vary slightly month-over-month. There have been more significant deviations following software upgrades, especially if the upgrade involved re-modeling of the beams. TG-100 guidance and the data presented here suggest an occurrence (O) of 2 depending on the frequency of re-commissioning the beams, severity (S) of 3, and detectability (D) of 2, giving an RPN of 12. Conclusion: Computerized treatment planning systems could pose a risk due to dosimetric errors and suboptimal treatment plans. The FMEA analysis presented here suggests that TPS QA should immediately follow software upgrades, but does not need to be performed every month.« less
Tank 241-AZ-101 Mixer Pump Test Vapor Sampling and Analysis Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
TEMPLETON, A.M.
2000-03-06
This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for vapor samples obtained during the operation of mixer pumps in tank 241-AZ-101. The primary purpose of the mixer pump test (MPT) is to demonstrate that the two 300 horsepower mixer pumps installed in tank 241-AZ-101 can mobilize the settled sludge so that it can be retrieved for treatment and vitrification. Sampling will be performed in accordance with Tank 241-AZ-101 Mixer Pump Test Data Quality Objective (Banning 1999) and Data Quality Objectives for Regulatory Requirements for Hazardous and Radioactive Air Emissionsmore » Sampling and Analysis (Mulkey 1999). The sampling will verify if current air emission estimates used in the permit application are correct and provide information for future air permit applications.« less