The Environmental Management Project Manager`s Handbook for improved project definition
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-02-01
The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, whichmore » is the focus of this handbook.« less
Generic project definitions for improvement of health care delivery: a case-based approach.
Niemeijer, Gerard C; Does, Ronald J M M; de Mast, Jeroen; Trip, Albert; van den Heuvel, Jaap
2011-01-01
The purpose of this article is to create actionable knowledge, making the definition of process improvement projects in health care delivery more effective. This study is a retrospective analysis of process improvement projects in hospitals, facilitating a case-based reasoning approach to project definition. Data sources were project documentation and hospital-performance statistics of 271 Lean Six Sigma health care projects from 2002 to 2009 of general, teaching, and academic hospitals in the Netherlands and Belgium. Objectives and operational definitions of improvement projects in the sample, analyzed and structured in a uniform format and terminology. Extraction of reusable elements of earlier project definitions, presented in the form of 9 templates called generic project definitions. These templates function as exemplars for future process improvement projects, making the selection, definition, and operationalization of similar projects more efficient. Each template includes an explicated rationale, an operationalization in the form of metrics, and a prototypical example. Thus, a process of incremental and sustained learning based on case-based reasoning is facilitated. The quality of project definitions is a crucial success factor in pursuits to improve health care delivery. We offer 9 tried and tested improvement themes related to patient safety, patient satisfaction, and business-economic performance of hospitals.
Definition of optical systems payloads
NASA Technical Reports Server (NTRS)
Downey, J. A., III
1981-01-01
The various phases in the formulation of a major NASA project include the inception of the project, planning of the concept, and the project definition. A baseline configuration is established during the planning stage, which serves as a basis for engineering trade studies. Basic technological problems should be recognized early, and a technological verification plan prepared before development of a project begins. A progressive series of iterations is required during the definition phase, illustrating the complex interdependence of existing subsystems. A systems error budget should be established to assess the overall systems performance, identify key performance drivers, and guide performance trades and iterations around these drivers, thus decreasing final systems requirements. Unnecessary interfaces should be avoided, and reasonable design and cost margins maintained. Certain aspects of the definition of the Advanced X-ray Astrophysics Facility are used as an example.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Audit Expense § 140.805 Definitions. (a) Project related audits. Audits which directly benefit Federal-aid highway projects. Audits performed in accordance with the requirements of 23 CFR part 12, audits of third party contract costs, and other audits providing assurance that a recipient has complied...
Multimodal Transportation Facility Resilience Index
DOT National Transportation Integrated Search
2017-03-21
A new paradigm for complex systems performance and maintenance decision making is developing in the form of resilience engineering. Depending on the subject area, different definitions of resilience exist. In this project, we adopt a definition appro...
NASA Technical Reports Server (NTRS)
1972-01-01
The work performed to arrive at a baseline astronomy sortie mission concept is summarized. The material includes: (1) definition of the telescopes and arrays; (2) preliminary definition of mission and systems; (3) identification, definition, and evaluation of alternative sortie programs; (4) the recommended astronomy sortie program; and (5) the astronomy sortie program concept that was approved as a baseline for the remainder of the project.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Definitions. 140.805 Section 140.805 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT State Highway Agency...-aid highway projects. Audits performed in accordance with the requirements of 23 CFR part 12, audits...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Definitions. 140.805 Section 140.805 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT State Highway Agency...-aid highway projects. Audits performed in accordance with the requirements of 23 CFR part 12, audits...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Definitions. 140.805 Section 140.805 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT State Highway Agency...-aid highway projects. Audits performed in accordance with the requirements of 23 CFR part 12, audits...
Code of Federal Regulations, 2011 CFR
2011-07-01
... following terms are defined: Adaptive management means the development of a management strategy that... guides modification of those projects to optimize performance. It includes the selection of appropriate... monitoring results to identify potential problems of a compensatory mitigation project and the identification...
Project Atlas Field Definitions | NOAA Gulf Spill Restoration
Archive Home Project Atlas Field Definitions Project Atlas Field Definitions Field Definition Project Title The Project Title as listed in the Final Early Restoration Plan and Environmental Assessment (FERP /EA). General Information: Project Description Narrative description of the project. General
Code of Federal Regulations, 2010 CFR
2010-07-01
... performance of the Central and Southern Project and other water management systems in the South Florida... locations and times. Natural system means all land and water managed by the Federal government or the State... System Operating Manual and Project Operating Manuals. Operating Manuals contain water control plans...
Code of Federal Regulations, 2011 CFR
2011-07-01
... performance of the Central and Southern Project and other water management systems in the South Florida... locations and times. Natural system means all land and water managed by the Federal government or the State... System Operating Manual and Project Operating Manuals. Operating Manuals contain water control plans...
Code of Federal Regulations, 2010 CFR
2010-07-01
... modification of those projects to optimize performance. It includes the selection of appropriate measures that... fee program that are available for sale prior to being fulfilled in accordance with an approved mitigation project plan. Advance credit sales require an approved in-lieu fee program instrument that meets...
Code of Federal Regulations, 2010 CFR
2010-07-01
... guides modification of those projects to optimize performance. It includes the selection of appropriate... approved in-lieu fee program that are available for sale prior to being fulfilled in accordance with an approved mitigation project plan. Advance credit sales require an approved in-lieu fee program instrument...
Fuller, Colin; Jaques, Rod; Hunter, Glenn
2013-01-01
Background. Describing the frequency, severity, and causes of sports injuries and illnesses reliably is important for quantifying the risk to athletes and providing direction for prevention initiatives. Methods. Time-loss and/or medical-attention definitions have long been used in sports injury/illness epidemiology research, but the limitations to these definitions mean that some events are incorrectly classified or omitted completely, where athletes continue to train and compete at high levels but experience restrictions in their performance. Introducing a graded definition of performance-restriction may provide a solution to this issue. Results. Results from the Great Britain injury/illness performance project (IIPP) are presented using a performance-restriction adaptation of the accepted surveillance consensus methodologies. The IIPP involved 322 Olympic athletes (males: 172; female: 150) from 10 Great Britain Olympic sports between September 2009 and August 2012. Of all injuries (n = 565), 216 were classified as causing time-loss, 346 as causing performance-restriction, and 3 were unclassified. For athlete illnesses (n = 378), the majority (P < 0.01) resulted in time-loss (270) compared with performance-restriction (101) (7 unclassified). Conclusions. Successful implementation of prevention strategies relies on the correct characterisation of injury/illness risk factors. Including a performance-restriction classification could provide a deeper understanding of injuries/illnesses and better informed prevention initiatives. PMID:26464883
SE Requirements Development Tool User Guide
DOE Office of Scientific and Technical Information (OSTI.GOV)
Benson, Faith Ann
2016-05-13
The LANL Systems Engineering Requirements Development Tool (SERDT) is a data collection tool created in InfoPath for use with the Los Alamos National Laboratory’s (LANL) SharePoint sites. Projects can fail if a clear definition of the final product requirements is not performed. For projects to be successful requirements must be defined early in the project and those requirements must be tracked during execution of the project to ensure the goals of the project are met. Therefore, the focus of this tool is requirements definition. The content of this form is based on International Council on Systems Engineering (INCOSE) and Departmentmore » of Defense (DoD) process standards and allows for single or collaborative input. The “Scoping” section is where project information is entered by the project team prior to requirements development, and includes definitions and examples to assist the user in completing the forms. The data entered will be used to define the requirements and once the form is filled out, a “Requirements List” is automatically generated and a Word document is created and saved to a SharePoint document library. SharePoint also includes the ability to download the requirements data defined in the InfoPath from into an Excel spreadsheet. This User Guide will assist you in navigating through the data entry process.« less
Development of a large-screen high-definition laser video projection system
NASA Astrophysics Data System (ADS)
Clynick, Tony J.
1991-08-01
A prototype laser video projector which uses electronic, optical, and mechanical means to project a television picture is described. With the primary goal of commercial viability, the price/performance ratio of the chosen means is critical. The fundamental requirement has been to achieve high brightness, high definition images of at least movie-theater size, at a cost comparable with other existing large-screen video projection technologies, while having the opportunity of developing and exploiting the unique properties of the laser projected image, such as its infinite depth-of-field. Two argon lasers are used in combination with a dye laser to achieve a range of colors which, despite not being identical to those of a CRT, prove to be subjectively acceptable. Acousto-optic modulation in combination with a rotary polygon scanner, digital video line stores, novel specialized electro-optics, and a galvanometric frame scanner form the basis of the projection technique achieving a 30 MHz video bandwidth, high- definition scan rates (1125/60 and 1250/50), high contrast ratio, and good optical efficiency. Auditorium projection of HDTV pictures wider than 20 meters are possible. Applications including 360 degree(s) projection and 3-D video provide further scope for exploitation of the HD laser video projector.
2008-07-01
cycle Evolution of a system, product, service, project or other human-made entity from conception through retirement [ ISO 12207 ]. Logical line of...012 [ ISO 1995] International Organization for Standardization. ISO /IEC 12207 :1995—Information technology— Software life cycle processes. http...definitions, authors were asked to use or align with already existing standards such as those available through ISO and IEEE when possible. Literature
A Statistical Project Control Tool for Engineering Managers
NASA Technical Reports Server (NTRS)
Bauch, Garland T.
2001-01-01
This slide presentation reviews the use of a Statistical Project Control Tool (SPCT) for managing engineering projects. A literature review pointed to a definition of project success, (i.e., A project is successful when the cost, schedule, technical performance, and quality satisfy the customer.) The literature review also pointed to project success factors, and traditional project control tools, and performance measures that are detailed in the report. The essential problem is that with resources becoming more limited, and an increasing number or projects, project failure is increasing, there is a limitation of existing methods and systematic methods are required. The objective of the work is to provide a new statistical project control tool for project managers. Graphs using the SPCT method plotting results of 3 successful projects and 3 failed projects are reviewed, with success and failure being defined by the owner.
Code of Federal Regulations, 2011 CFR
2011-10-01
... financing instruments and costs incurred by the Grantee in performing project related audits, and includes.... Quality of life means the level of social, environmental and economic satisfaction and well being a...
Improving Space Project Cost Estimating with Engineering Management Variables
NASA Technical Reports Server (NTRS)
Hamaker, Joseph W.; Roth, Axel (Technical Monitor)
2001-01-01
Current space project cost models attempt to predict space flight project cost via regression equations, which relate the cost of projects to technical performance metrics (e.g. weight, thrust, power, pointing accuracy, etc.). This paper examines the introduction of engineering management parameters to the set of explanatory variables. A number of specific engineering management variables are considered and exploratory regression analysis is performed to determine if there is statistical evidence for cost effects apart from technical aspects of the projects. It is concluded that there are other non-technical effects at work and that further research is warranted to determine if it can be shown that these cost effects are definitely related to engineering management.
Optimal projection method determination by Logdet Divergence and perturbed von-Neumann Divergence.
Jiang, Hao; Ching, Wai-Ki; Qiu, Yushan; Cheng, Xiao-Qing
2017-12-14
Positive semi-definiteness is a critical property in kernel methods for Support Vector Machine (SVM) by which efficient solutions can be guaranteed through convex quadratic programming. However, a lot of similarity functions in applications do not produce positive semi-definite kernels. We propose projection method by constructing projection matrix on indefinite kernels. As a generalization of the spectrum method (denoising method and flipping method), the projection method shows better or comparable performance comparing to the corresponding indefinite kernel methods on a number of real world data sets. Under the Bregman matrix divergence theory, we can find suggested optimal λ in projection method using unconstrained optimization in kernel learning. In this paper we focus on optimal λ determination, in the pursuit of precise optimal λ determination method in unconstrained optimization framework. We developed a perturbed von-Neumann divergence to measure kernel relationships. We compared optimal λ determination with Logdet Divergence and perturbed von-Neumann Divergence, aiming at finding better λ in projection method. Results on a number of real world data sets show that projection method with optimal λ by Logdet divergence demonstrate near optimal performance. And the perturbed von-Neumann Divergence can help determine a relatively better optimal projection method. Projection method ia easy to use for dealing with indefinite kernels. And the parameter embedded in the method can be determined through unconstrained optimization under Bregman matrix divergence theory. This may provide a new way in kernel SVMs for varied objectives.
34 CFR 664.5 - What definitions apply to the Fulbright-Hays Group Projects Abroad Program?
Code of Federal Regulations, 2012 CFR
2012-07-01
... Projects Abroad Program? 664.5 Section 664.5 Education Regulations of the Offices of the Department of... PROJECTS ABROAD PROGRAM General § 664.5 What definitions apply to the Fulbright-Hays Group Projects Abroad... apply to this program: The following definitions apply to the Fulbright-Hays Group Projects Abroad...
34 CFR 664.5 - What definitions apply to the Fulbright-Hays Group Projects Abroad Program?
Code of Federal Regulations, 2014 CFR
2014-07-01
... Projects Abroad Program? 664.5 Section 664.5 Education Regulations of the Offices of the Department of... PROJECTS ABROAD PROGRAM General § 664.5 What definitions apply to the Fulbright-Hays Group Projects Abroad... apply to this program: The following definitions apply to the Fulbright-Hays Group Projects Abroad...
34 CFR 664.5 - What definitions apply to the Fulbright-Hays Group Projects Abroad Program?
Code of Federal Regulations, 2013 CFR
2013-07-01
... Projects Abroad Program? 664.5 Section 664.5 Education Regulations of the Offices of the Department of... PROJECTS ABROAD PROGRAM General § 664.5 What definitions apply to the Fulbright-Hays Group Projects Abroad... apply to this program: The following definitions apply to the Fulbright-Hays Group Projects Abroad...
34 CFR 664.5 - What definitions apply to the Fulbright-Hays Group Projects Abroad Program?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Projects Abroad Program? 664.5 Section 664.5 Education Regulations of the Offices of the Department of... PROJECTS ABROAD PROGRAM General § 664.5 What definitions apply to the Fulbright-Hays Group Projects Abroad... apply to this program: The following definitions apply to the Fulbright-Hays Group Projects Abroad...
34 CFR 664.5 - What definitions apply to the Fulbright-Hays Group Projects Abroad Program?
Code of Federal Regulations, 2011 CFR
2011-07-01
... Projects Abroad Program? 664.5 Section 664.5 Education Regulations of the Offices of the Department of... PROJECTS ABROAD PROGRAM General § 664.5 What definitions apply to the Fulbright-Hays Group Projects Abroad... apply to this program: The following definitions apply to the Fulbright-Hays Group Projects Abroad...
Small Unit Decision Making (SUDM) Assessment Battery
2014-11-21
largest contribution towards differentiating between the performance level of the NCO and Lt groups participating in the project. Two additional...Situational Judgment Test, made the largest contribution towards differentiating between the performance level of NCOs and Lts. Additionally, two other...basic perceptual skills. For the construct of cognitive flexibility we suggest the development of a performance instrument in line with our definition
Fission Power System Technology for NASA Exploration Missions
NASA Technical Reports Server (NTRS)
Mason, Lee; Houts, Michael
2011-01-01
Under the NASA Exploration Technology Development Program, and in partnership with the Department of Energy (DOE), NASA is conducting a project to mature Fission Power System (FPS) technology. A primary project goal is to develop viable system options to support future NASA mission needs for nuclear power. The main FPS project objectives are as follows: 1) Develop FPS concepts that meet expected NASA mission power requirements at reasonable cost with added benefits over other options. 2) Establish a hardware-based technical foundation for FPS design concepts and reduce overall development risk. 3) Reduce the cost uncertainties for FPS and establish greater credibility for flight system cost estimates. 4) Generate the key products to allow NASA decisionmakers to consider FPS as a preferred option for flight development. In order to achieve these goals, the FPS project has two main thrusts: concept definition and risk reduction. Under concept definition, NASA and DOE are performing trade studies, defining requirements, developing analytical tools, and formulating system concepts. A typical FPS consists of the reactor, shield, power conversion, heat rejection, and power management and distribution (PMAD). Studies are performed to identify the desired design parameters for each subsystem that allow the system to meet the requirements with reasonable cost and development risk. Risk reduction provides the means to evaluate technologies in a laboratory test environment. Non-nuclear hardware prototypes are built and tested to verify performance expectations, gain operating experience, and resolve design uncertainties.
Code of Federal Regulations, 2011 CFR
2011-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CIVIL RIGHTS EXTERNAL PROGRAMS Construction Contract... means a Federal or State employee regularly employed and experienced in civil rights policies, practices... include preliminary engineering work in project development or engineering services performed by or for a...
Code of Federal Regulations, 2014 CFR
2014-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CIVIL RIGHTS EXTERNAL PROGRAMS Construction Contract... means a Federal or State employee regularly employed and experienced in civil rights policies, practices... include preliminary engineering work in project development or engineering services performed by or for a...
Code of Federal Regulations, 2013 CFR
2013-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CIVIL RIGHTS EXTERNAL PROGRAMS Construction Contract... means a Federal or State employee regularly employed and experienced in civil rights policies, practices... include preliminary engineering work in project development or engineering services performed by or for a...
Code of Federal Regulations, 2012 CFR
2012-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CIVIL RIGHTS EXTERNAL PROGRAMS Construction Contract... means a Federal or State employee regularly employed and experienced in civil rights policies, practices... include preliminary engineering work in project development or engineering services performed by or for a...
Code of Federal Regulations, 2010 CFR
2010-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CIVIL RIGHTS EXTERNAL PROGRAMS Construction Contract... means a Federal or State employee regularly employed and experienced in civil rights policies, practices... include preliminary engineering work in project development or engineering services performed by or for a...
Code of Federal Regulations, 2012 CFR
2012-04-01
... include performing a needs assessment, completing and/or verifying master plans, developing justification... environmental, archeological, cultural resource, historic preservation, and conduct of similar assessments. (d...; programmatic needs; and, for facilities projects, a detailed room-by-room listing of spaces, including net and...
Code of Federal Regulations, 2014 CFR
2014-04-01
... include performing a needs assessment, completing and/or verifying master plans, developing justification... environmental, archeological, cultural resource, historic preservation, and conduct of similar assessments. (d...; programmatic needs; and, for facilities projects, a detailed room-by-room listing of spaces, including net and...
Code of Federal Regulations, 2013 CFR
2013-04-01
... include performing a needs assessment, completing and/or verifying master plans, developing justification... environmental, archeological, cultural resource, historic preservation, and conduct of similar assessments. (d...; programmatic needs; and, for facilities projects, a detailed room-by-room listing of spaces, including net and...
Code of Federal Regulations, 2011 CFR
2011-04-01
... include performing a needs assessment, completing and/or verifying master plans, developing justification... environmental, archeological, cultural resource, historic preservation, and conduct of similar assessments. (d...; programmatic needs; and, for facilities projects, a detailed room-by-room listing of spaces, including net and...
Code of Federal Regulations, 2010 CFR
2010-10-01
... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT General Provisions § 633.5 Definitions. As used in this part... construction and management of a project. Major capital project means a project that: (1) Involves the...; or (3) The Administrator determines is a major capital project because the project management...
Code of Federal Regulations, 2013 CFR
2013-10-01
... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT General Provisions § 633.5 Definitions. As used in this part... construction and management of a project. Major capital project means a project that: (1) Involves the...; or (3) The Administrator determines is a major capital project because the project management...
Code of Federal Regulations, 2012 CFR
2012-10-01
... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT General Provisions § 633.5 Definitions. As used in this part... construction and management of a project. Major capital project means a project that: (1) Involves the...; or (3) The Administrator determines is a major capital project because the project management...
Code of Federal Regulations, 2011 CFR
2011-10-01
... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT General Provisions § 633.5 Definitions. As used in this part... construction and management of a project. Major capital project means a project that: (1) Involves the...; or (3) The Administrator determines is a major capital project because the project management...
Code of Federal Regulations, 2014 CFR
2014-10-01
... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT General Provisions § 633.5 Definitions. As used in this part... construction and management of a project. Major capital project means a project that: (1) Involves the...; or (3) The Administrator determines is a major capital project because the project management...
34 CFR 75.622 - Definition of “project materials.”
Code of Federal Regulations, 2014 CFR
2014-07-01
... 34 Education 1 2014-07-01 2014-07-01 false Definition of âproject materials.â 75.622 Section 75... Must Be Met by a Grantee? Publications and Copyrights § 75.622 Definition of “project materials.” As used in §§ 75.620-75.621, “project materials” means a copyrightable work developed with funds from a...
VCCS Transfer Project: Transfer Rates, Transfer Performance, and Baccalaureate Completion.
ERIC Educational Resources Information Center
McHewitt, Earl R.; Taylor, Garry
This document analyzes a study done by the Center for the Study of Community Colleges (CSCC), which examined transfer rates in the VCCS. The document provides definitions for transfer rate, academic performance, and completion rate as they are used in the study. The study answers the following questions: (1) which pool of students were used in the…
Code of Federal Regulations, 2011 CFR
2011-10-01
... to help determine the impact of an RSVP project on the community, including the volunteers... reasonable accommodation, can perform the essential functions of a volunteer position that such individual... application, in which RSVP volunteers are recruited, enrolled, and placed on assignments. (p) Sponsor. A...
Code of Federal Regulations, 2014 CFR
2014-10-01
... to help determine the impact of an RSVP project on the community, including the volunteers... reasonable accommodation, can perform the essential functions of a volunteer position that such individual... application, in which RSVP volunteers are recruited, enrolled, and placed on assignments. (p) Sponsor. A...
Code of Federal Regulations, 2013 CFR
2013-10-01
... to help determine the impact of an RSVP project on the community, including the volunteers... reasonable accommodation, can perform the essential functions of a volunteer position that such individual... application, in which RSVP volunteers are recruited, enrolled, and placed on assignments. (p) Sponsor. A...
Code of Federal Regulations, 2012 CFR
2012-10-01
... to help determine the impact of an RSVP project on the community, including the volunteers... reasonable accommodation, can perform the essential functions of a volunteer position that such individual... application, in which RSVP volunteers are recruited, enrolled, and placed on assignments. (p) Sponsor. A...
42 CFR 137.280 - Construction Definitions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... during which planning services are provided. Planning services may include performing a needs assessment... environmental assessment nor an environmental impact statement is required. Any procedures under this section... environmental review activities and justifying the need for the project. SHPO means State Historic Preservation...
42 CFR 137.280 - Construction Definitions.
Code of Federal Regulations, 2014 CFR
2014-10-01
... during which planning services are provided. Planning services may include performing a needs assessment... environmental assessment nor an environmental impact statement is required. Any procedures under this section... environmental review activities and justifying the need for the project. SHPO means State Historic Preservation...
42 CFR 137.280 - Construction Definitions.
Code of Federal Regulations, 2012 CFR
2012-10-01
... during which planning services are provided. Planning services may include performing a needs assessment... environmental assessment nor an environmental impact statement is required. Any procedures under this section... environmental review activities and justifying the need for the project. SHPO means State Historic Preservation...
42 CFR 137.280 - Construction Definitions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... during which planning services are provided. Planning services may include performing a needs assessment... environmental assessment nor an environmental impact statement is required. Any procedures under this section... environmental review activities and justifying the need for the project. SHPO means State Historic Preservation...
42 CFR 137.280 - Construction Definitions.
Code of Federal Regulations, 2013 CFR
2013-10-01
... during which planning services are provided. Planning services may include performing a needs assessment... environmental assessment nor an environmental impact statement is required. Any procedures under this section... environmental review activities and justifying the need for the project. SHPO means State Historic Preservation...
Communication Platform Payload Definition (CPPD) study. Volume 2: Technical report
NASA Technical Reports Server (NTRS)
Hunter, E. M.; Driggers, T.; Jorasch, R.
1986-01-01
This is Volume 2 (Technical Report) of the Ford Aerospace & Communications Corporation Final Report for the Communication Platform Payload Definition (CPPD) Study program conducted for NASA Lewis Research Center under contract No. NAS3-24235. This report presents the results of the study effort leading to five potential platform payloads to service CONUS and WARC Region 2 traffic demand as projected to the year 2008. The report addresses establishing the data bases, developing service aggregation scenarios, selecting and developing 5 payload concepts, performing detailed definition of the 5 payloads, costing them, identifying critical technology, and finally comparing the payloads with each other and also with non-aggregated equivalent services.
Communication Platform Payload Definition (CPPD) study. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
Hunter, E. M.
1986-01-01
This is Volume 1 (Executive Summary) of the Ford Aerospace & Communications Corporation Final Report for the Communication Platform Payload Definition (CPPD) Study program conducted for NASA Lewis Research Center under contract No. NAS3-24235. This report presents the results of the study effort leading to five potential platform payloads to service CONUS and WARC Region 2 traffic demand as projected to the year 2008. The report addresses establishing the data bases, developing service aggregation scenarios, selecting and developing 5 payload concepts, performing detailed definition of the 5 payloads, costing them, identifying critical technology, and finally comparing the payloads with each other and also with non-aggregated equivalent services.
Communication Platform Payload Definition (CPPD) study. Volume 3: Addendum
NASA Technical Reports Server (NTRS)
Hunter, E. M.; Driggers, T.; Jorasch, R.
1986-01-01
This is Volume 3 (Addendum) of the Ford Aerospace & Communications Corporation Final Report for the Communication Platform Payload Definition (CPPD) Study Program conducted for NASA Lewis Research Center under contract No. NAS3-24235. This report presents the results of the study effort leading to five potential platform payloads to service CONUS and WARC Region 2 traffic demand as projected to the year 2008. The report addresses establishing the data bases, developing service aggregation scenarios, selecting and developing 5 payload concepts, performing detailed definition of the 5 payloads, costing them, identifying critical technology, and finally comparing the payloads with each other and also with non-aggregated equivalent services.
DOT National Transportation Integrated Search
2002-04-01
The National ITS Architecture Mission Definition includes the system level concepts and requirements that document the fundamental needs which will be fulfilled by a successful ITS architecture. It provides a representation of the system that is usef...
Viking 75 project: Viking lander system primary mission performance report
NASA Technical Reports Server (NTRS)
Cooley, C. G.
1977-01-01
Viking Lander hardware performance during launch, interplanetary cruise, Mars orbit insertion, preseparation, separation through landing, and the primary landed mission, with primary emphasis on Lander engineering and science hardware operations, the as-flown mission are described with respect to Lander system performance and anomalies during the various mission phases. The extended mission and predicted Lander performance is discussed along with a summary of Viking goals, mission plans, and description of the Lander, and its subsystem definitions.
Facilities Planning Guide for the Community College System.
ERIC Educational Resources Information Center
Massachusetts Advisory Council on Education, Boston.
These guidelines include definitions pertaining to educational criteria and planning criteria, and guidelines regarding--(1) administrative ratios, (2) space allocation in assignable square feet, (3) area conversion factors, (4) gross building area distribution, (5) curriculum balance development, (6) project performance schedule, and (7) project…
Exploring Stakeholder Definitions within the Aerospace Industry: A Qualitative Case Study
NASA Astrophysics Data System (ADS)
Hebert, Jonathan R.
A best practice in the discipline of project management is to identify all key project stakeholders prior to the execution of a project. When stakeholders are properly identified, they can be consulted to provide expert advice on project activities so that the project manager can ensure the project stays within the budget and schedule constraints. The problem addressed by this study is that managers fail to properly identify key project stakeholders when using stakeholder theory because there are multiple conflicting definitions for the term stakeholder. Poor stakeholder identification has been linked to multiple negative project outcomes such as budget and schedules overruns, and this problem is heightened in certain industries such as aerospace. The purpose of this qualitative study was to explore project managers' and project stakeholders' perceptions of how they define and use the term stakeholder within the aerospace industry. This qualitative exploratory single-case study had two embedded units of analysis: project managers and project stakeholders. Six aerospace project managers and five aerospace project stakeholders were purposively selected for this study. Data were collected through individual semi-structured interviews with both project managers and project stakeholders. All data were analyzed using Yin's (2011) five-phased cycle approach for qualitative research. The results indicated that the aerospace project managers and project stakeholder define the term stakeholder as "those who do the work of a company." The participants build upon this well-known concept by adding that, "a company should list specific job titles" that correspond to their company specific-stakeholder definition. Results also indicated that the definition of the term stakeholder is used when management is assigning human resources to a project to mitigate or control project risk. Results showed that project managers tended to include the customer in their stakeholder definitions while project stakeholders included a wider range of stakeholders from young employees to union workers. Practical application recommendations, based on the study's findings, include that companies start to develop company-specific definitions of the term stakeholder. Recommendations for future research should focus on exploring how CEOs, executive members, new hires, and hourly workers define and use the term stakeholder in the aerospace industry.
NASA Technical Reports Server (NTRS)
1979-01-01
Contents: project plan summary; project and mission objectives; related studies and technology support activities; technical summary; management; procurement approach; project definition items and schedule; resources; management review; controlled items; and safety, reliability, and quality assurance.
49 CFR 350.105 - What definitions are used in this part?
Code of Federal Regulations, 2013 CFR
2013-10-01
..., Administrative Takedown, and Incentive Funds. Commercial motor vehicle (CMV) means a motor vehicle that has any...) means the document outlining the State's CMV safety objectives, strategies, activities and performance... projects that improve CMV safety and compliance with CMV safety regulations (including activities and...
49 CFR 350.105 - What definitions are used in this part?
Code of Federal Regulations, 2014 CFR
2014-10-01
..., Administrative Takedown, and Incentive Funds. Commercial motor vehicle (CMV) means a motor vehicle that has any...) means the document outlining the State's CMV safety objectives, strategies, activities and performance... projects that improve CMV safety and compliance with CMV safety regulations (including activities and...
49 CFR 350.105 - What definitions are used in this part?
Code of Federal Regulations, 2012 CFR
2012-10-01
..., Administrative Takedown, and Incentive Funds. Commercial motor vehicle (CMV) means a motor vehicle that has any...) means the document outlining the State's CMV safety objectives, strategies, activities and performance... projects that improve CMV safety and compliance with CMV safety regulations (including activities and...
An interferometer for high-resolution optical surveillance from geostationary orbit
NASA Astrophysics Data System (ADS)
Bonino, L.; Bresciani, F.; Piasini, G.; Flebus, C.; Lecat, J.-H.; Roose, S.; Pisani, M.; Cabral, A.; Rebordão, J.; Proença, C.; Costal, J.; Lima, P. U.; Loix, N.; Musso, F.
2017-11-01
The activities described in this paper have been developed in the frame of the EUCLID CEPA 9 RTP 9.9 "High Resolution Optical Satellite Sensor" project of the WEAO Research Cell. They have been focused on the definition of an interferometric instrument optimised for the high-resolution optical surveillance from geostationary orbit (GEO) by means of the synthetic aperture technique, and on the definition and development of the related enabling technologies. In this paper we describe the industrial team, the selected mission specifications and overview of the whole design and manufacturing activities performed.
The perspectives, information and conclusions conveyed in research project abstracts, progress reports, final reports, journal abstracts and journal publications convey the viewpoints of the principal investigator and may not represent the views and policies of ORD and EPA. Concl...
14 CFR 1216.302 - Definition of key terms.
Code of Federal Regulations, 2011 CFR
2011-01-01
... performing in-house R&D and for planning, managing, and supporting contractor and grantee R&D), and for other... related facility equipment; design of facilities projects; and advance planning related to future facilities needs. (4) Space Flight, Control and Data Communications (SFCDC). Has similar scope to R&D but...
14 CFR 1216.302 - Definition of key terms.
Code of Federal Regulations, 2012 CFR
2012-01-01
... performing in-house R&D and for planning, managing, and supporting contractor and grantee R&D), and for other... related facility equipment; design of facilities projects; and advance planning related to future facilities needs. (4) Space Flight, Control and Data Communications (SFCDC). Has similar scope to R&D but...
14 CFR 1216.302 - Definition of key terms.
Code of Federal Regulations, 2010 CFR
2010-01-01
... performing in-house R&D and for planning, managing, and supporting contractor and grantee R&D), and for other... related facility equipment; design of facilities projects; and advance planning related to future facilities needs. (4) Space Flight, Control and Data Communications (SFCDC). Has similar scope to R&D but...
Code of Federal Regulations, 2010 CFR
2010-04-01
... CERTAIN SUBSIDIZED AND HUD-OWNED PROJECTS Subsidized Projects § 247.2 Definitions. Drug-related criminal... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Definitions. 247.2 Section 247.2 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF...
Caous, Cristofer André; Machado, Birajara; Hors, Cora; Zeh, Andrea Kaufmann; Dias, Cleber Gustavo; Amaro Junior, Edson
2012-01-01
To propose a measure (index) of expected risks to evaluate and follow up the performance analysis of research projects involving financial and adequate structure parameters for its development. A ranking of acceptable results regarding research projects with complex variables was used as an index to gauge a project performance. In order to implement this method the ulcer index as the basic model to accommodate the following variables was applied: costs, high impact publication, fund raising, and patent registry. The proposed structured analysis, named here as RoSI (Return on Scientific Investment) comprises a pipeline of analysis to characterize the risk based on a modeling tool that comprises multiple variables interacting in semi-quantitatively environments. This method was tested with data from three different projects in our Institution (projects A, B and C). Different curves reflected the ulcer indexes identifying the project that may have a minor risk (project C) related to development and expected results according to initial or full investment. The results showed that this model contributes significantly to the analysis of risk and planning as well as to the definition of necessary investments that consider contingency actions with benefits to the different stakeholders: the investor or donor, the project manager and the researchers.
TOSCA-based orchestration of complex clusters at the IaaS level
NASA Astrophysics Data System (ADS)
Caballer, M.; Donvito, G.; Moltó, G.; Rocha, R.; Velten, M.
2017-10-01
This paper describes the adoption and extension of the TOSCA standard by the INDIGO-DataCloud project for the definition and deployment of complex computing clusters together with the required support in both OpenStack and OpenNebula, carried out in close collaboration with industry partners such as IBM. Two examples of these clusters are described in this paper, the definition of an elastic computing cluster to support the Galaxy bioinformatics application where the nodes are dynamically added and removed from the cluster to adapt to the workload, and the definition of an scalable Apache Mesos cluster for the execution of batch jobs and support for long-running services. The coupling of TOSCA with Ansible Roles to perform automated installation has resulted in the definition of high-level, deterministic templates to provision complex computing clusters across different Cloud sites.
Thermoelectric Outer Planets Spacecraft (TOPS)
NASA Technical Reports Server (NTRS)
1973-01-01
The research and advanced development work is reported on a ballistic-mode, outer planet spacecraft using radioisotope thermoelectric generator (RTG) power. The Thermoelectric Outer Planet Spacecraft (TOPS) project was established to provide the advanced systems technology that would allow the realistic estimates of performance, cost, reliability, and scheduling that are required for an actual flight mission. A system design of the complete RTG-powered outer planet spacecraft was made; major technical innovations of certain hardware elements were designed, developed, and tested; and reliability and quality assurance concepts were developed for long-life requirements. At the conclusion of its active phase, the TOPS Project reached its principal objectives: a development and experience base was established for project definition, and for estimating cost, performance, and reliability; an understanding of system and subsystem capabilities for successful outer planets missions was achieved. The system design answered long-life requirements with massive redundancy, controlled by on-board analysis of spacecraft performance data.
System verification and validation: a fundamental systems engineering task
NASA Astrophysics Data System (ADS)
Ansorge, Wolfgang R.
2004-09-01
Systems Engineering (SE) is the discipline in a project management team, which transfers the user's operational needs and justifications for an Extremely Large Telescope (ELT) -or any other telescope-- into a set of validated required system performance characteristics. Subsequently transferring these validated required system performance characteris-tics into a validated system configuration, and eventually into the assembled, integrated telescope system with verified performance characteristics and provided it with "objective evidence that the particular requirements for the specified intended use are fulfilled". The latter is the ISO Standard 8402 definition for "Validation". This presentation describes the verification and validation processes of an ELT Project and outlines the key role System Engineering plays in these processes throughout all project phases. If these processes are implemented correctly into the project execution and are started at the proper time, namely at the very beginning of the project, and if all capabilities of experienced system engineers are used, the project costs and the life-cycle costs of the telescope system can be reduced between 25 and 50 %. The intention of this article is, to motivate and encourage project managers of astronomical telescopes and scientific instruments to involve the entire spectrum of Systems Engineering capabilities performed by trained and experienced SYSTEM engineers for the benefit of the project by explaining them the importance of Systems Engineering in the AIV and validation processes.
Code of Federal Regulations, 2013 CFR
2013-04-01
... Definitions. The following definitions apply to the Operating Fund program: 1937 Act means the United States... this part. Other operating costs (add-ons) means PHA expenses that are recognized as formula expenses...) expressed as a PUM cost. Project units means all dwelling units in all of a PHA's projects under an ACC...
Code of Federal Regulations, 2012 CFR
2012-04-01
... Definitions. The following definitions apply to the Operating Fund program: 1937 Act means the United States... this part. Other operating costs (add-ons) means PHA expenses that are recognized as formula expenses...) expressed as a PUM cost. Project units means all dwelling units in all of a PHA's projects under an ACC...
Code of Federal Regulations, 2010 CFR
2010-04-01
... Definitions. The following definitions apply to the Operating Fund program: 1937 Act means the United States... this part. Other operating costs (add-ons) means PHA expenses that are recognized as formula expenses...) expressed as a PUM cost. Project units means all dwelling units in all of a PHA's projects under an ACC...
Code of Federal Regulations, 2011 CFR
2011-04-01
... Definitions. The following definitions apply to the Operating Fund program: 1937 Act means the United States... this part. Other operating costs (add-ons) means PHA expenses that are recognized as formula expenses...) expressed as a PUM cost. Project units means all dwelling units in all of a PHA's projects under an ACC...
Code of Federal Regulations, 2014 CFR
2014-04-01
... Definitions. The following definitions apply to the Operating Fund program: 1937 Act means the United States... this part. Other operating costs (add-ons) means PHA expenses that are recognized as formula expenses...) expressed as a PUM cost. Project units means all dwelling units in all of a PHA's projects under an ACC...
Wide Field Infrared Survey Telescope [WFIRST]: Telescope Design and Simulated Performance
NASA Technical Reports Server (NTRS)
Goullioud, R.; Content, D. A.; Kuan, G. M.; Moore, J. D.; Chang, Z.; Sunada, E. T.; Villalvazo, J.; Hawk, J. P.; Armani, N. V.; Johnson, E. L.;
2012-01-01
The ASTRO2010 Decadal Survey proposed multiple missions with NIR focal planes and 3 mirror wide field telescopes in the 1.5m aperture range. None of them would have won as standalone missions WFIRST is a combination of these missions, created by Astro 2010 committee. WFIRST Science Definition Team (SDT) tasked to examine the design. Project team is a GSFC-JPL-Caltech collaboration. This interim mission design is a result of combined work by the project team with the SDT.
Advanced Thermal Emission Imaging Systems Definition and Development
NASA Technical Reports Server (NTRS)
Blasius, Karl; Nava, David (Technical Monitor)
2002-01-01
Santa Barbara Remote Sensing (SBRS), Raytheon Company, is pleased to submit this quarterly progress report of the work performed in the third quarter of Year 2 of the Advanced THEMIS Project, July through September 2002. We review here progress in the proposed tasks. During July through September 2002 progress was made in two major tasks, Spectral Response Characterization and Flight Instrument Definition. Because of staffing problems and technical problems earlier in the program we have refocused the remaining time and budget on the key technical tasks. Current technical problems with a central piece of test equipment has lead us to request a 1 quarter extension to the period of performance. This request is being made through a separate letter independent of this report.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., AND APPEAL PROCEDURES FOR NATIONAL FOREST SYSTEM PROJECTS AND ACTIVITIES § 215.2 Definitions. Address... specific project or activity. Categorically excluded (CE)—Proposed actions, which do not individually or... Responsible Official on a proposed action subject to this part, except for projects requiring an EIS which...
Phase C/D program development plan. Volume 1: Program plan
NASA Technical Reports Server (NTRS)
1971-01-01
The Phase C/D definition of the Modular Space Station has been developed. The modular approach selected during the option period was evaluated, requirements were defined, and program definition and preliminary design were accomplished. The Space Station Project is covered in depth, the research applications module is limited to a project-level definition, and the shuttle operations are included for interface requirements identification, scheduling, and costing. Discussed in detail are: (1) baseline program and project descriptions; (2) phase project planning; (3) modular space station program schedule; (4) program management plan; (5) operations; (6) facilities; (7) logistics; and (8) manpower.
Goddard High Resolution Spectrograph SV/GTO Project
NASA Technical Reports Server (NTRS)
Ebbets, Dennis
1999-01-01
Contract number NAS5-30433, known at Ball Aerospace as the GHRS SV/GTO project, supported our participation in the post-launch activities of the Goddard High Resolution Spectrograph aboard the Hubble Space Telescope. The period of performance was December 1988 through December 1998. The contract supported the involvement of Dr Dennis Ebbets in the work of the GHRS Investigation Definition Team, and several of the Ball people in the documentation and publication of results. Three main categories of tasks were covered by this contract; in-orbit calibration of the GHRS, guaranteed time observations, and education and public outreach. The nature and accomplishments of these tasks are described in the report. This summary makes many references to publications in the scientific and technical literature. Appendix A is extracted from a complete bibliography, and lists those papers that are directly related to work performed under this GHRS contract. The tasks related to the in-orbit calibration of the GHRS were by far the largest responsibility during the first six years of the project. During this period Dr. Ebbets was responsible for the definition of calibration requirements, design of experiments, preparation of observing proposals, tracking their implementation and execution, and coordinating the analysis and publication of the results. Prior to the launch of HST in 1990 the observing proposals were developed in cooperation with the scientists on the GHRS DDT, engineers at Ball Aerospace, the operations staff at the STScI, and project coordinators at GSFC.
Managing a big ground-based astronomy project: the Thirty Meter Telescope (TMT) project
NASA Astrophysics Data System (ADS)
Sanders, Gary H.
2008-07-01
TMT is a big science project and its scale is greater than previous ground-based optical/infrared telescope projects. This paper will describe the ideal "linear" project and how the TMT project departs from that ideal. The paper will describe the needed adaptations to successfully manage real world complexities. The progression from science requirements to a reference design, the development of a product-oriented Work Breakdown Structure (WBS) and an organization that parallels the WBS, the implementation of system engineering, requirements definition and the progression through Conceptual Design to Preliminary Design will be summarized. The development of a detailed cost estimate structured by the WBS, and the methodology of risk analysis to estimate contingency fund requirements will be summarized. Designing the project schedule defines the construction plan and, together with the cost model, provides the basis for executing the project guided by an earned value performance measurement system.
Report of activities of the advanced coal extraction systems definition project, 1979 - 1980
NASA Technical Reports Server (NTRS)
Lavin, M. L.; Isenberg, L.
1981-01-01
During this period effort was devoted to: formulation of system performance goals in the areas of production cost, miner safety, miner health, environmental impact, and coal conservation, survey and in depth assessment of promising technology, and characterization of potential resource targets. Primary system performance goals are to achieve a return on incremental investment of 150% of the value required for a low risk capital improvement project and to reduce deaths and disability injuries per million man-hour by 50%. Although these performance goals were developed to be immediately applicable to the Central Appalachian coal resources, they were also designed to be readily adaptable to other coals by appending a geological description of the new resource. The work done on technology assessment was concerned with the performance of the slurry haulage system.
Particle Engulfment and Pushing by Solidifying Interfaces (PEPSI)
NASA Technical Reports Server (NTRS)
Stefanescu, Doru Michael; Curreri, Peter A.; Juretsko, F.; Pang, H.; Phalnikar, R.
1993-01-01
The preliminary definition phase included the following actions: producing a science requiring document (draft), producing a science requirements document (preliminary), updating the flight program proposal, project review at NASA Marshall Space Flight Center, and research work as defined in the statement of work. The first three items of this plan have been delivered by the University of Alabama to NASA according to schedule. A project review meeting was held at MSFC on June 29, 1993. Consequently, this part of the report will address the results of the research work performed in the Solidification Laboratory at the University of Alabama during the first six months of the project.
DOE Office of Scientific and Technical Information (OSTI.GOV)
BEVINS, R.R.
This study is a requirements document that presents analysis for the functional description for the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operations input or engineering judgment. The requirements in this study apply to the first phase of the W314 Project. This document has been updated during the definitive design portion of the first phase of the W314 Project to capture additional software requirements and is planned to be updated duringmore » the second phase of the W314 Project to cover the second phase of the project's scope.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
BEVINS, R.R.
This document has been updated during the definitive design portion of the first phase of the W-314 Project to capture additional software requirements and is planned to be updated during the second phase of the W-314 Project to cover the second phase of the Project's scope. The objective is to provide requirement traceability by recording the analysis/basis for the functional descriptions of the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operationsmore » input or engineering judgment.« less
Review of NASA's Hypersonic Research Engine Project
NASA Technical Reports Server (NTRS)
Andrews, Earl H.; Mackley, Ernest A.
1993-01-01
The goals of the NASA Hypersonic Research Engine (HRE) Project, which began in 1964, were to design, develop, and construct a hypersonic research ramjet/scramjet engine for high performance and to flight-test the developed concept over the speed range from Mach 3 to 8. The project was planned to be accomplished in three phases: project definition, research engine development, and flight test using the X-15A-2 research aircraft, which was modified to carry hydrogen fuel for the research engine. The project goal of an engine flight test was eliminated when the X-15 program was canceled in 1968. Ground tests of engine models then became the focus of the project. Two axisymmetric full-scale engine models having 18-inch-diameter cowls were fabricated and tested: a structural model and a combustion/propulsion model. A brief historical review of the project with salient features, typical data results, and lessons learned is presented.
Crustal deformations in the Central Mediterranean derived from the WHAT A CAT GPS project.
NASA Astrophysics Data System (ADS)
Kaniuth, K.; Drewes, H.; Stuber, K.; Tremel, H.; Kahler, H.-G.; Peter, Y.; Zerbini, S.; Tonti, G.; Veis, G.; Fagard, H.
1999-03-01
The West Hellenic Arc Tectonics and Calabrian Arc Tectonics (WHAT A CAT) project aimes at monitoring crustal deformations in the Central Mediterranean by repeated GPS campaigns. The data set acquired so far is rather heterogeneous in terms of availability of GPS satellites, performance of the involved receiver systems and quality of the satellites' orbits. The paper presents the velocity estimates achieved using a modified version of the Bernese GPS software. Main characteristic of the solution strategy is the definition of station velocity parameters already on theobservation equation level.
Code of Federal Regulations, 2012 CFR
2012-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION INTELLIGENT TRANSPORTATION SYSTEMS INTELLIGENT TRANSPORTATION SYSTEM ARCHITECTURE AND STANDARDS § 940.3 Definitions. Intelligent Transportation System (ITS... projects or groups of projects. Systems engineering is a structured process for arriving at a final design...
Code of Federal Regulations, 2013 CFR
2013-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION INTELLIGENT TRANSPORTATION SYSTEMS INTELLIGENT TRANSPORTATION SYSTEM ARCHITECTURE AND STANDARDS § 940.3 Definitions. Intelligent Transportation System (ITS... projects or groups of projects. Systems engineering is a structured process for arriving at a final design...
Code of Federal Regulations, 2014 CFR
2014-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION INTELLIGENT TRANSPORTATION SYSTEMS INTELLIGENT TRANSPORTATION SYSTEM ARCHITECTURE AND STANDARDS § 940.3 Definitions. Intelligent Transportation System (ITS... projects or groups of projects. Systems engineering is a structured process for arriving at a final design...
34 CFR 608.4 - What definitions apply?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 3 2010-07-01 2010-07-01 false What definitions apply? 608.4 Section 608.4 Education... What definitions apply? (a) Definitions in EDGAR. The following terms used in this part are defined in... Project period Public Secretary (b) Other definitions. The following definitions also apply to this part...
Code of Federal Regulations, 2010 CFR
2010-01-01
... Regulations of the Department of Agriculture (Continued) COOPERATIVE STATE RESEARCH, EDUCATION, AND EXTENSION... definitions applicable to the program under this subpart include: Integrated project means a project that... or activity. Specialty crop means fruits and vegetables, tree nuts, dried fruits, and horticulture...
MPD Thruster Performance Analytic Models
NASA Technical Reports Server (NTRS)
Gilland, James; Johnston, Geoffrey
2003-01-01
Magnetoplasmadynamic (MPD) thrusters are capable of accelerating quasi-neutral plasmas to high exhaust velocities using Megawatts (MW) of electric power. These characteristics make such devices worthy of consideration for demanding, far-term missions such as the human exploration of Mars or beyond. Assessment of MPD thrusters at the system and mission level is often difficult due to their status as ongoing experimental research topics rather than developed thrusters. However, in order to assess MPD thrusters utility in later missions, some adequate characterization of performance, or more exactly, projected performance, and system level definition are required for use in analyses. The most recent physical models of self-field MPD thrusters have been examined, assessed, and reconfigured for use by systems and mission analysts. The physical models allow for rational projections of thruster performance based on physical parameters that can be measured in the laboratory. The models and their implications for the design of future MPD thrusters are presented.
MPD Thruster Performance Analytic Models
NASA Technical Reports Server (NTRS)
Gilland, James; Johnston, Geoffrey
2007-01-01
Magnetoplasmadynamic (MPD) thrusters are capable of accelerating quasi-neutral plasmas to high exhaust velocities using Megawatts (MW) of electric power. These characteristics make such devices worthy of consideration for demanding, far-term missions such as the human exploration of Mars or beyond. Assessment of MPD thrusters at the system and mission level is often difficult due to their status as ongoing experimental research topics rather than developed thrusters. However, in order to assess MPD thrusters utility in later missions, some adequate characterization of performance, or more exactly, projected performance, and system level definition are required for use in analyses. The most recent physical models of self-field MPD thrusters have been examined, assessed, and reconfigured for use by systems and mission analysts. The physical models allow for rational projections of thruster performance based on physical parameters that can be measured in the laboratory. The models and their implications for the design of future MPD thrusters are presented.
Final Overview of ACES Simulation for Evaluation SARP Well-Clear Definitions
NASA Technical Reports Server (NTRS)
Santiago, Confesor; Johnson, Marcus A.; Isaacson, Doug; Hershey, David
2014-01-01
The UAS in the NAS project is studying the minimum operational performance standards for unmanned aerial systems (UAS's) detect-and-avoid (DAA) system in order to operate in the National Airspace System. The DoD's Science and research Panel (SARP) Well-Clear Workshop is investigating the time and spatial boundary at which an UAS violates well-clear. NASA is supporting this effort through use of its Airspace Concept Evaluation System (ACES) simulation platform. This briefing presents the final results to the SARP, which will be used to judge the three candidate well-clear definitions, and for the selection of the most operationally suitable option.
High definition TV projection via single crystal faceplate technology
NASA Astrophysics Data System (ADS)
Kindl, H. J.; St. John, Thomas
1993-03-01
Single crystal phosphor faceplates are epitaxial phosphors grown on crystalline substrates with the advantages of high light output, resolution, and extended operational life. Single crystal phosphor faceplate industrial technology in the United States is capable of providing a faceplate appropriate to the projection industry of up to four (4) inches in diameter. Projection systems incorporating cathode ray tubes utilizing single crystal phosphor faceplates will produce 1500 lumens of white light with 1000 lines of resolution, non-interlaced. This 1500 lumen projection system will meet all of the currently specified luminance and resolution requirements of Visual Display systems for flight simulators. Significant logistic advantages accrue from the introduction of single crystal phosphor faceplate CRT's. Specifically, the full performance life of a CRT is expected to increase by a factor of five (5); ie, from 2000 to 10,000 hours of operation. There will be attendant reductions in maintenance time, spare CRT requirements, system down time, etc. The increased brightness of the projection system will allow use of lower gain, lower cost simulator screen material. Further, picture performance characteristics will be more balanced across the full simulator.
2017-10-01
PROJECT NUMBER 5e. TASK NUMBER E-Mail: 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) AND ADDRESS(ES) 8. PERFORMING... ORGANIZATION REPORT NUMBER 9. SPONSORING / MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) U.S. Army Medical Research and...Participants & Other Collaborating Organizations 13 8. Special Reporting Requirements 14 9. Appendices 14 4 1. INTRODUCTION: 2. KEYWORDS
Building the Case Toward a Definitive Clinical Trial: Saline Versus Plasma-Lyte
2014-04-01
Plasma-Lyte* 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) Chung K. K., Dubick M. A., 5d. PROJECT NUMBER 5e. TASK...NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) United States Army Institute of Surgical Research, JBSA Fort Sam...Hosuton, TX 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME( S ) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM( S ) 11
Code of Federal Regulations, 2010 CFR
2010-10-01
... THE RETIRED AND SENIOR VOLUNTEER PROGRAM General § 2553.12 Definitions. (a) Act. The Domestic... by the RSVP project sponsor and the volunteer station that identifies project requirements, working relationships and mutual responsibilities. (i) National Senior Service Corps (NSSC). The collective name for the...
NASA Astrophysics Data System (ADS)
Lorenzo Alvarez, Jose; Metselaar, Harold; Amiaux, Jerome; Saavedra Criado, Gonzalo; Gaspar Venancio, Luis M.; Salvignol, Jean-Christophe; Laureijs, René J.; Vavrek, Roland
2016-08-01
In the last years, the system engineering field is coming to terms with a paradigm change in the approach for complexity management. Different strategies have been proposed to cope with highly interrelated systems, system of systems and collaborative system engineering have been proposed and a significant effort is being invested into standardization and ontology definition. In particular, Model Based System Engineering (MBSE) intends to introduce methodologies for a systematic system definition, development, validation, deployment, operation and decommission, based on logical and visual relationship mapping, rather than traditional 'document based' information management. The practical implementation in real large-scale projects is not uniform across fields. In space science missions, the usage has been limited to subsystems or sample projects with modeling being performed 'a-posteriori' in many instances. The main hurdle for the introduction of MBSE practices in new projects is still the difficulty to demonstrate their added value to a project and whether their benefit is commensurate with the level of effort required to put them in place. In this paper we present the implemented Euclid system modeling activities, and an analysis of the benefits and limitations identified to support in particular requirement break-down and allocation, and verification planning at mission level.
NASA's Hypersonic Research Engine Project: A review
NASA Technical Reports Server (NTRS)
Andrews, Earl H.; Mackley, Ernest A.
1994-01-01
The goals of the NASA Hypersonic Research Engine (HRE) Project, which began in 1964, were to design, develop, and construct a high-performance hypersonic research ramjet/scramjet engine for flight tests of the developed concept over the speed range of Mach 4 to 8. The project was planned to be accomplished in three phases: project definition, research engine development, and flight test using the X-15A-2 research airplane, which was modified to carry hydrogen fuel for the research engine. The project goal of an engine flight test was eliminated when the X-15 program was canceled in 1968. Ground tests of full-scale engine models then became the focus of the project. Two axisymmetric full-scale engine models, having 18-inch-diameter cowls, were fabricated and tested: a structural model and combustion/propulsion model. A brief historical review of the project, with salient features, typical data results, and lessons learned, is presented. An extensive number of documents were generated during the HRE Project and are listed.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 4 2013-01-01 2013-01-01 false Definitions. 609.2 Section 609.2 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS LOAN GUARANTEES FOR PROJECTS THAT EMPLOY INNOVATIVE... in the proposed Eligible Project, or the Applicant. Secretary means the Secretary of Energy or a duly...
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 4 2012-01-01 2012-01-01 false Definitions. 609.2 Section 609.2 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS LOAN GUARANTEES FOR PROJECTS THAT EMPLOY INNOVATIVE... in the proposed Eligible Project, or the Applicant. Secretary means the Secretary of Energy or a duly...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 4 2014-01-01 2014-01-01 false Definitions. 609.2 Section 609.2 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS LOAN GUARANTEES FOR PROJECTS THAT EMPLOY INNOVATIVE... in the proposed Eligible Project, or the Applicant. Secretary means the Secretary of Energy or a duly...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Authorized by the Healthy Forests Restoration Act of 2003 § 218.2 Definitions. Address: An individual's or organization's current physical mailing address. An e-mail address is not sufficient. Authorized hazardous fuel reduction project: A hazardous fuel reduction project authorized by the Healthy Forests Restoration Act of...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Authorized by the Healthy Forests Restoration Act of 2003 § 218.2 Definitions. Address: An individual's or organization's current physical mailing address. An e-mail address is not sufficient. Authorized hazardous fuel reduction project: A hazardous fuel reduction project authorized by the Healthy Forests Restoration Act of...
What's in a Name? Definitions and Conceptualisations of Teleworking and Homeworking.
ERIC Educational Resources Information Center
Sullivan, Cath
2003-01-01
Discusses the debate over definitions of teleworking and other home-based working. Argues that project-specific definitions are useful and inevitable. Challenges the assertion that a single definition should be used by all research. (Contains 36 references.) (JOW)
1998-09-30
The Electrostatic Levitator (ESL) Facility established at Marshall Space Flight Center (MSFC) supports NASA's Microgravity Materials Science Research Program. NASA materials science investigations include ground-based, flight definition and flight projects. Flight definition projects, with demanding science concept review schedules, receive highest priority for scheduling experiment time in the Electrostatic Levitator (ESL) Facility.
Code of Federal Regulations, 2010 CFR
2010-04-01
... work; (iv) Unusual concrete deterioration or cracking, including development of new cracks or the... ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS General Provisions § 12.3 Definitions. (a) General rule. For purposes of this part, terms defined in section 3 of the...
Code of Federal Regulations, 2010 CFR
2010-04-01
... SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR PERSONS WITH DISABILITIES... for Projects With HUD-Insured and HUD-Held Mortgages § 886.102 Definitions. The terms Fair Market Rent...-held purchase money mortgage; or a project for the elderly financed under section 202 of the Housing...
Code of Federal Regulations, 2013 CFR
2013-01-01
... project. A pilot project authorized by the Administrator in writing, designed to test or improve program... CONTROL AND ERADICATION OF LIVESTOCK OR POULTRY DISEASES CONTROL OF SCRAPIE § 54.1 Definitions. Accredited... by the Administrator in accordance with § 54.11 to conduct one or more scrapie tests, or genotype...
Code of Federal Regulations, 2011 CFR
2011-01-01
... project. A pilot project authorized by the Administrator in writing, designed to test or improve program... CONTROL AND ERADICATION OF LIVESTOCK OR POULTRY DISEASES CONTROL OF SCRAPIE § 54.1 Definitions. Accredited... by the Administrator in accordance with § 54.11 to conduct one or more scrapie tests, or genotype...
Code of Federal Regulations, 2010 CFR
2010-01-01
... project. A pilot project authorized by the Administrator in writing, designed to test or improve program... CONTROL AND ERADICATION OF LIVESTOCK OR POULTRY DISEASES CONTROL OF SCRAPIE § 54.1 Definitions. Accredited... by the Administrator in accordance with § 54.11 to conduct one or more scrapie tests, or genotype...
Code of Federal Regulations, 2012 CFR
2012-01-01
... project. A pilot project authorized by the Administrator in writing, designed to test or improve program... CONTROL AND ERADICATION OF LIVESTOCK OR POULTRY DISEASES CONTROL OF SCRAPIE § 54.1 Definitions. Accredited... by the Administrator in accordance with § 54.11 to conduct one or more scrapie tests, or genotype...
Code of Federal Regulations, 2014 CFR
2014-01-01
... project. A pilot project authorized by the Administrator in writing, designed to test or improve program... CONTROL AND ERADICATION OF LIVESTOCK OR POULTRY DISEASES CONTROL OF SCRAPIE § 54.1 Definitions. Accredited... by the Administrator in accordance with § 54.11 to conduct one or more scrapie tests, or genotype...
NASA Docking System (NDS) Interface Definitions Document (IDD)
NASA Technical Reports Server (NTRS)
Tabakman, Alexander; England, Warren
2013-01-01
The contents of this document define the integrated performance and interface design for NASA Docking System (NDS) Block 1 and the International Docking Adapter. The intent of this IDD is to provide the interface design for using, installing, and interfacing to the NDS Block 1 that will enable successful docking to the IDA. This document is under the control of the ISS Development Projects Office (OG).
A Project Manager’s Personal Attributes as Predictors for Success
2007-03-01
Northouse (2004) explains that leadership is highly a researched topic with much written. Yet, a definitive description of this phenomenon is difficult to...express because of its complexity. Even though leadership has varied descriptions and conceptualizations, Northouse states that the concept of...characteristic of leadership is not an accurate predictor of performance. Leadership is a complex, multi-faceted attribute ( Northouse , 2004) and specific
Management approach recommendations. Earth Observatory Satellite system definition study (EOS)
NASA Technical Reports Server (NTRS)
1974-01-01
Management analyses and tradeoffs were performed to determine the most cost effective management approach for the Earth Observatory Satellite (EOS) Phase C/D. The basic objectives of the management approach are identified. Some of the subjects considered are as follows: (1) contract startup phase, (2) project management control system, (3) configuration management, (4) quality control and reliability engineering requirements, and (5) the parts procurement program.
Magnetic bearings for a high-performance optical disk buffer, volume 1
NASA Technical Reports Server (NTRS)
Hockney, Richard; Adler, Karen; Anastas, George, Jr.; Downer, James; Flynn, Frederick; Goldie, James; Gondhalekar, Vijay; Hawkey, Timothy; Johnson, Bruce
1990-01-01
The innovation investigated in this project was the application of magnetic bearing technology to the translator head of an optical-disk data storage device. Both the capability for space-based applications and improved performance are expected to result. The phase 1 effort produced: (1) detailed specifications for both the translator-head and rotary-spindel bearings; (2) candidate hardware configurations for both bearings with detail definition for the translator head; (3) required characteristics for the magnetic bearing control loops; (4) position sensor selection; and (5) definition of the required electronic functions. The principal objective of Phase 2 was the design, fabrication, assembly, and test of the magnetic bearing system for the translator head. The scope of work included: (1) mechanical design of each of the required components; (2) electrical design of the required circuitry; (3) fabrication of the component parts and bread-board electronics; (4) generation of a test plan; and (5) integration of the prototype unit and performance testing. The project has confirmed the applicability of magnetic bearing technology to suspension of the translator head of the optical disk device, and demonstrated the achievement of all performance objectives. The magnetic bearing control loops perform well, achieving 100 Hz nominal bandwidth with phase margins between 37 and 63 degrees. The worst-case position resolution is 0.02 micron in the displacement loops and 1 micron rad in the rotation loops, The system is very robust to shock disturbances, recovering smoothly even when collisions occur between the translator and frame. The unique start-up/shut-down circuit has proven very effective.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-06-01
In response to a request from the Association of Southeast Asian Nations (ASEAN), the U.S. Trade and Development Program (TDP) conducted a definitional mission to evaluate the prospects of TDP funding for five Power Interconnection Projects in the ASEAN region. These projects included: Batam-Singapore Interconnection; Sumatera-Peninsular Malaysia Interconnection; Sarawak-West Kalimantan Interconnection; Sarawak-Brunei-Sabah Interconnection; and Java-Sumatera Interconnection. Based on a review of the proposed scopes of work for the projects and the discussions in the field, the report summarizes the technical details and the costs of implementation for the projects.
The Online Learning Definitions Project
ERIC Educational Resources Information Center
International Association for K-12 Online Learning, 2011
2011-01-01
The mission of the International Association for K-12 Online Learning (iNACOL) is to ensure all students have access to a world-class education and quality online learning opportunities that prepare them for a lifetime of success. "The Online Learning Definitions Project" is designed to provide states, districts, online programs, and…
76 FR 9077 - Proposed Collection; Comment Request for Regulation Project
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-16
... soliciting comments concerning an existing final regulation, PS-262-82 (T.D. 8600), Definition of an S... assured of consideration. ADDRESSES: Direct all written comments to Yvette B. Lawrence, Internal Revenue...: Definition of an S Corporation. OMB Number: 1545-0731. Regulation Project Number: PS-262-82 (T.D. 8600...
U.S. Energy Service Company (ESCO) Industry: Recent Market Trends
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stuart, Elizabeth; Larsen, Peter H.; Carvallo, Juan Pablo
This study presents an analysis of the market size, growth projections and industry trends of the U.S. Energy Service Company (ESCO) industry, drawing on information provided by ESCO executives in late 2015. We define ESCOs as energy service companies for whom performance-based contracting is a core business offering. We identified forty-seven firms that met our definition of an ESCO.1 Forty-three of these companies responded to our requests for information, representing a 91% response rate.2 We also report 2014 ESCO industry revenues by market segment, region and business activity type, and for new versus existing customers. Finally, we report on usemore » of tax incentives and financing tools, and incorporation of non-energy benefits into performance-based project economics. We summarize key findings below.« less
König, H; Klose, K J
1999-04-01
The formulation of requirements is necessary to control the goals of a PACS project. Furthermore, in this way, the scope of functionality necessary to support radiological working processes becomes clear. Definitions of requirements and specification are formulated independently of systems according to the IEEE standard "Recommended Practice for Software Requirements Specifications". Definitions are given in the Request for Information, specifications in the Request for Proposal. Functional and non-functional requirements are distinguished. The solutions are rated with respect to scope, appropriateness and quality of implementation. A PACS checklist was created according to the methods described above. It is published on the homepage of the "Arbeitsgemeinschaft Informationstechnologie" (AGIT) within the "Deutsche Röntgengesellschaft" (DRG) (http://www.uni-marburg.de/mzr/agit). The checklist provides a discussion forum which should contribute to an agreement on accepted basic PACS functionalities.
7 CFR 1210.311 - Programs and projects.
Code of Federal Regulations, 2010 CFR
2010-01-01
... PROMOTION PLAN Watermelon Research and Promotion Plan Definitions § 1210.311 Programs and projects. Programs and projects mean those research, development, advertising, or promotion programs or projects...
NASA Technical Reports Server (NTRS)
Wolf, M.
1981-01-01
The effect of solar cell metallization pattern design on solar cell performance and the costs and performance effects of different metallization processes are discussed. Definitive design rules for the front metallization pattern for large area solar cells are presented. Chemical and physical deposition processes for metallization are described and compared. An economic evaluation of the 6 principal metallization options is presented. Instructions for preparing Format A cost data for solar cell manufacturing processes from UPPC forms for input into the SAMIC computer program are presented.
The ALMA CONOPS project: the impact of funding decisions on observatory performance
NASA Astrophysics Data System (ADS)
Ibsen, Jorge; Hibbard, John; Filippi, Giorgio
2014-08-01
In time when every penny counts, many organizations are facing the question of how much scientific impact a budget cut can have or, putting it in more general terms, which is the science impact of alternative (less costly) operational modes. In reply to such question posted by the governing bodies, the ALMA project had to develop a methodology (ALMA Concepts for Operations, CONOPS) that attempts to measure the impact that alternative operational scenarios may have on the overall scientific production of the Observatory. Although the analysis and the results are ALMA specific, the developed approach is rather general and provides a methodology for a cost-performance analysis of alternatives before any radical alterations to the operations model are adopted. This paper describes the key aspects of the methodology: a) the definition of the Figures of Merit (FoMs) for the assessment of quantitative science performance impacts as well as qualitative impacts, and presents a methodology using these FoMs to evaluate the cost and impact of the different operational scenarios; b) the definition of a REFERENCE operational baseline; c) the identification of Alternative Scenarios each replacing one or more concepts in the REFERENCE by a different concept that has a lower cost and some level of scientific and/or operational impact; d) the use of a Cost-Performance plane to graphically combine the effects that the alternative scenarios can have in terms of cost reduction and affected performance. Although is a firstorder assessment, we believe this approach is useful for comparing different operational models and to understand the cost performance impact of these choices. This can be used to take decision to meet budget cuts as well as in evaluating possible new emergent opportunities.
Code of Federal Regulations, 2011 CFR
2011-04-01
....103 Definitions. (a) “ACC expiration date” means the last day of the term during which a particular public housing project is subject to all or any of the provisions of the ACC. The ACC term for a... Contribution Date for the project, as determined under the ACC (e.g., if the last debt service Annual...
Code of Federal Regulations, 2010 CFR
2010-04-01
....103 Definitions. (a) “ACC expiration date” means the last day of the term during which a particular public housing project is subject to all or any of the provisions of the ACC. The ACC term for a... Contribution Date for the project, as determined under the ACC (e.g., if the last debt service Annual...
24 CFR 891.655 - Definitions applicable to 202/162 projects.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Definitions applicable to 202/162 projects. 891.655 Section 891.655 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF THE ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING COMMISSIONER, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT ...
24 CFR 891.655 - Definitions applicable to 202/162 projects.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Definitions applicable to 202/162 projects. 891.655 Section 891.655 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF THE ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING COMMISSIONER, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT ...
24 CFR 891.655 - Definitions applicable to 202/162 projects.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Definitions applicable to 202/162 projects. 891.655 Section 891.655 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT (CONTINUED) OFFICE OF THE ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING COMMISSIONER, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT ...
24 CFR 891.655 - Definitions applicable to 202/162 projects.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Definitions applicable to 202/162 projects. 891.655 Section 891.655 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF THE ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING COMMISSIONER, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT ...
Cross-Cultural Validation of the Definition of Multimorbidity in the Bulgarian Language.
Assenova, Radost S; Le Reste, Jean Yves; Foreva, Gergana H; Mileva, Daniela S; Czachowski, Slawomir; Sowinska, Agnieszka; Nabbe, Patrice; Argyriadou, Stella; Lazic, Djurdjica; Hasaganic, Melida; Lingner, Heidrun; Lygidakis, Harris; Muñoz, Miguel-Angel; Claveria, Ana; Doerr, Chista; Van Marwijk, Harm; Van Royen, Paul; Lietard, Claire
2015-01-01
Multimorbidity is a health issue with growing importance. During the last few decades the populations of most countries in the world have been ageing rapidly. Bulgaria is affected by the issue because of the high prevalence of ageing population in the country with multiple chronic conditions. The AIM of the present study was to validate the translated definition of multimorbidity from English into the Bulgarian language. The present study is part of an international project involving 8 national groups. We performed a forward and backward translation of the original English definition of multimorbidity using a Delphi consensus procedure. The physicians involved accepted the definition with a high percentage of agreement in the first round. The backward translation was accepted by the scientific committee using the Nominal group technique. Some of the GPs provided comments on the linguistic expressions which arose in order to improve understanding in Bulgarian. The remarks were not relevant to the content. The conclusion of the discussion, using a meta-ethnographic approach, was that the differences were acceptable and no further changes were required. A native version of the published English multimorbidity definition has been finalized. This definition is a prerequisite for better management of multimorbidity by clinicians, researchers and policy makers.
NASA Astrophysics Data System (ADS)
Vianna Baptista, M. L.
2013-07-01
Integrating different technologies and expertises help fill gaps when optimizing documentation of complex buildings. Described below is the process used in the first part of a restoration project, the architectural survey of Theatre Guaira Cultural Centre in Curitiba, Brazil. To diminish time on fieldwork, the two-person-field-survey team had to juggle, during three days, the continuous artistic activities and performers' intense schedule. Both technologies (high definition laser scanning and close-range photogrammetry) were used to record all details in the least amount of time without disturbing the artists' rehearsals and performances. Laser Scanning was ideal to record the monumental stage structure with all of its existing platforms, light fixtures, scenery walls and curtains. Although scanned with high-definition, parts of the exterior façades were also recorded using Close Range Photogrammetry. Tiny cracks on the marble plaques and mosaic tiles, not visible in the point clouds, were then able to be precisely documented in order to create the exterior façades textures and damages mapping drawings. The combination of technologies and the expertise of service providers, knowing how and what to document, and what to deliver to the client, enabled maximum benefits to the following restoration project.
Child development: analysis of a new concept.
de Souza, Juliana Martins; Veríssimo, Maria de La Ó Ramallo
2015-01-01
To perform concept analysis of the term child development (CD) and submit it to review by experts. Analysis of concept according to the hybrid model, in three phases: theoretical phase, with literature review; field phase of qualitative research with professionals who care for children; and analytical phase, of articulation of data from previous steps, based on the bioecological theory of development. The new definition was analyzed by experts in a focus group. Project approved by the Research Ethics Committee. We reviewed 256 articles, from 12 databases and books, and interviewed 10 professionals, identifying that: The CD concept has as antecedents aspects of pregnancy, factors of the child, factors of context, highlighting the relationships and child care, and social aspects; its consequences can be positive or negative, impacting on society; its attributes are behaviors and abilities of the child; its definitions are based on maturation, contextual perspectives or both. The new definition elaborated in concept analysis was validated by nine experts in focus group. It expresses the magnitude of the phenomenon and factors not presented in other definitions. The research produced a new definition of CD that can improve nursing classifications for the comprehensive care of the child.
Child development: analysis of a new concept1
de Souza, Juliana Martins; Veríssimo, Maria de La Ó Ramallo
2015-01-01
Objectives: to perform concept analysis of the term child development (CD) and submit it to review by experts. Method: analysis of concept according to the hybrid model, in three phases: theoretical phase, with literature review; field phase of qualitative research with professionals who care for children; and analytical phase, of articulation of data from previous steps, based on the bioecological theory of development. The new definition was analyzed by experts in a focus group. Project approved by the Research Ethics Committee. Results: we reviewed 256 articles, from 12 databases and books, and interviewed 10 professionals, identifying that: The CD concept has as antecedents aspects of pregnancy, factors of the child, factors of context, highlighting the relationships and child care, and social aspects; its consequences can be positive or negative, impacting on society; its attributes are behaviors and abilities of the child; its definitions are based on maturation, contextual perspectives or both. The new definition elaborated in concept analysis was validated by nine experts in focus group. It expresses the magnitude of the phenomenon and factors not presented in other definitions. Conclusion: the research produced a new definition of CD that can improve nursing classifications for the comprehensive care of the child. PMID:26626001
NASA Astrophysics Data System (ADS)
Salah Alaloul, Wesam; Shahir Liew, Mohd; Zawawi, Noor Amila Wan
2017-12-01
The accomplishment of construction projects is extremely dependent on the integration of several stakeholders; therefore none of them has the control or the ability to accomplish the project alone. Each of them may influence and be influenced by the project management approach. There is no comprehensive theoretical platform for defining Communication, Coordination and Cooperation (3Cs) in the management of construction project. This paper deliberates the function of the 3Cs different theoretical perceptions. Through an analysis of selected articles from reputable academic journals in construction management, the business environment and human behaviour were identified as two main parts. A little has been done so far about the 3Cs, and how they are correlated with construction projects performance. Therefore, the objective of this paper is to explain the definitions and the association between the 3Cs. There is a significant link between communication and coordination. Coordination alternatively, is trust-based a logic of mutual and exchange. Consequently, cooperation is much more sophisticated, which needing more time and attempts.
NASA Technical Reports Server (NTRS)
Schlagheck, R. A.
1977-01-01
New planning techniques and supporting computer tools are needed for the optimization of resources and costs for space transportation and payload systems. Heavy emphasis on cost effective utilization of resources has caused NASA program planners to look at the impact of various independent variables that affect procurement buying. A description is presented of a category of resource planning which deals with Spacelab inventory procurement analysis. Spacelab is a joint payload project between NASA and the European Space Agency and will be flown aboard the Space Shuttle starting in 1980. In order to respond rapidly to the various procurement planning exercises, a system was built that could perform resource analysis in a quick and efficient manner. This system is known as the Interactive Resource Utilization Program (IRUP). Attention is given to aspects of problem definition, an IRUP system description, questions of data base entry, the approach used for project scheduling, and problems of resource allocation.
W.A. Parish Post-Combustion CO{sub 2} Capture and Sequestration Project Phase 1 Definition
DOE Office of Scientific and Technical Information (OSTI.GOV)
Armpriester, Anthony; Smith, Roger; Scheriffius, Jeff
2014-02-01
For a secure and sustainable energy future, the United States (U.S.) must reduce its dependence on imported oil and reduce its emissions of carbon dioxide (CO{sub 2}) and other greenhouse gases (GHGs). To meet these strategic challenges, the U.S. wiU have to create fundamentally new technologies with performance levels far beyond what is now possible. Developing advanced post-combustion clean coal technologies for capturing CO{sub 2} from existing coal-fired power plants can play a major role in the country's transition to a sustainable energy future, especially when coupled with CO{sub 2}-enhanced oil recovery (CO{sub 2}-EOR). Pursuant to these goals, NRG Energy,more » Inc. (NRG) submitted an application and entered into a cost-shared collaboration with the U.S. Department of Energy (DOE) under Round 3 of the Clean Coal Power Initiative (CCPI) to advance low-emission coal technologies. The objective of the NRG W A Parish Post-Combustion CO{sub 2} Capture and Sequestration Demonstration Project is to establish the technical feasibility and economic viability of post-combustion CO{sub 2} capture using flue gas from an existing pulverized coal-fired boiler integrated with geologic sequestration via an enhanced oil recovery (EOR) process. To achieve these objectives, the project will be executed in three phases. Each phase represents a distinct aspect of the project execution. The project phases are: • Phase I. Project Definition/Front-End Engineering Design (FEED) • Phase ll. Detailed Engineering, Procurement & Construction • Phase III. Demonstration and Monitoring The purpose of Phase I is to develop the project in sufficient detail to facilitate the decision-making process in progressing to the next stage of project delivery. Phase n. This report provides a complete summary of the FEED study effort, including pertinent project background information, the scope of facilities covered, decisions, challenges, and considerations made regarding configuration and performance of the facility, along with the conceptual design and estimate results. The findings of this report should be considered conceptual in nature and are conditioned on the statements contained herein. The cost of preparing this report (including the FEED study described herein) was funded in part by a $167-million grant provided by the U.S. DOE.« less
Electronic Equipment Maintenance Training (EEMT) System: System Definition Phase.
ERIC Educational Resources Information Center
Pine, S. M.; And Others
The second in a series of four reports on the Electronic Equipment Maintenance Training (EEMT) project, this document summarizes the system definition phase of the EEMT program. The purpose of this phase of the project was to define a comprehensive set of functions and training requirements that the EEMT must satisfy within the training mission of…
Definitions and Uses: Case Study of Teachers Implementing Project-Based Learning
ERIC Educational Resources Information Center
Tamim, Suha R.; Grant, Michael M.
2013-01-01
The purpose of this descriptive study was to explore inservice teachers' definitions of project-based learning (PjBL) and their accounts on the meaning of their PjBL implementations. A purposive sample of six teachers from grades four through twelve in public and private schools participated. Three themes evolved from inductive analysis: (1)…
The path to an experiment in space (from concept to flight)
NASA Technical Reports Server (NTRS)
Salzman, Jack A.
1994-01-01
The following are discussed in this viewgraph presentation on developing flight experiments for NASA's Microgravity Science and Applications Program: time from flight PI selection to launch; key flight experiment phases and schedule drivers; microgravity experiment definition/development process; definition and engineering development phase; ground-based reduced gravity research facilities; project organization; responsibilities and duties of principle investigator/co-investigators, project scientist, and project manager; the science requirements document; flight development phase; experiment cost and schedule; and keys to experiment success.
Code of Federal Regulations, 2010 CFR
2010-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION TRANSPORTATION INFRASTRUCTURE MANAGEMENT PROJECTS OF... efficient management of the project in accordance with applicable Federal statutes, regulations, and policy... of State Transportation Departments, with one State acting as the project lead. Eligible project...
Code of Federal Regulations, 2010 CFR
2010-04-01
... contract. This does not involve construction project management as defined in paragraph (d) of this section...) Construction project management means direct responsibility for the construction project through day-to-day on-site management and administration of the project. Activities may include cost management, project...
Code of Federal Regulations, 2012 CFR
2012-07-01
... of Congress. Flood control project: A project designed and constructed to have appreciable and... Washington, D.C. Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed... project, only those components that are necessary for the flood control function are considered eligible...
Code of Federal Regulations, 2013 CFR
2013-07-01
... of Congress. Flood control project: A project designed and constructed to have appreciable and... Washington, D.C. Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed... project, only those components that are necessary for the flood control function are considered eligible...
Code of Federal Regulations, 2011 CFR
2011-07-01
... of Congress. Flood control project: A project designed and constructed to have appreciable and... Washington, D.C. Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed... project, only those components that are necessary for the flood control function are considered eligible...
Code of Federal Regulations, 2010 CFR
2010-07-01
... of Congress. Flood control project: A project designed and constructed to have appreciable and... Washington, D.C. Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed... project, only those components that are necessary for the flood control function are considered eligible...
Eva Physiology, Systems, and Performance (EPSP) Project Overview
NASA Technical Reports Server (NTRS)
Gernhardt, Michael L.
2007-01-01
Extravehicular activity (EVA) is any activity performed by astronauts outside their space vehicle or habitat. EVA may be performed on orbit, such as outside the Space Shuttle or the International Space Station, or on a planetary surface such as Mars or on the moon. Astronauts wear a pressurized suit that provides environmental protection, mobility, life support, and communications while they work in the harsh conditions of a microgravity environment. Exploration missions to the moon and Mars may last many days and will include many types of EVAs; exploration, science, construction and maintenance. The effectiveness and success of these EVA-filled missions is dependent on the ability to perform tasks efficiently. The EVA Physiology, Systems and Performance (EPSP) project will conduct a number of studies to understand human performance during EVA, from a molecular level to full-scale equipment and suit design aspects, with the aim of developing safe and efficient systems for Exploration missions and the Constellation Program. The EPSP project will 1) develop Exploration Mission EVA suit requirements for metabolic and thermal loading, optional center of gravity location, biomedical sensors, hydration, nutrition, and human biomedical interactions; 2) develop validated EVA prebreathe protocols that meet medical, vehicle, and habitat constraints while minimizing crew time and thus increasing EVA work efficiency; and 3) define exploration decompression sickness (DCS) risks, policy, and mission success statistics and develop a DCS risk definition report.
The scientific programme between ESRO and ESA: Choosing new projects (1973-1977)
NASA Astrophysics Data System (ADS)
Russo, Arturo
1995-02-01
The ESA History Study Reports are preliminary reports of studies carried out within the framework of an ESA (European Space Agency) contract. They will form the basis of a comprehensive study of European Space activities covering the period 1959-1987. The transformation of ESRO (European Space Research Organization) into ESA found the Organization's bodies involved in a new round of the decision-making process to select future scientific satellite projects. In this report, the three main phases of the decision-making process are discussed. The first, from June 1973 to April 1974, the European scientific community and their representatives in ESA's advisory committee structure were invited to agree on a set of space missions for which a definition study was recommended. At the end of this phase, thirteen missions were selected for such a definition study by ESRO's Scientific Program Board (SPB). The second phase covers the period from that decision up to March 1975, when a much more important decision was required, namely to select a restricted number of missions for which a feasibility study was to be performed. The aims of such feasibility studies were to establish the technical and financial feasibility of each project, to propose a well-defined project concept, to identify the research and technology effort required to support it, and to state a preliminary cost estimate to completion. The third phase covers the first two years of the new Agency's life, and concludes with the selection of the projects to be adopted in ESA's scientific program.
41 CFR 109-28.5001 - Definition.
Code of Federal Regulations, 2010 CFR
2010-07-01
... AND DISTRIBUTION 28.50-Management of Equipment Held for Future Projects § 109-28.5001 Definition... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Definition. 109-28.5001 Section 109-28.5001 Public Contracts and Property Management Federal Property Management Regulations...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 13 2011-01-01 2009-01-01 true Definitions. 1942.304 Section 1942.304 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE... § 1942.304 Definitions. Project. For rural business enterprise grants, the result of the use of program...
Fusion Simulation Program Definition. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cary, John R.
2012-09-05
We have completed our contributions to the Fusion Simulation Program Definition Project. Our contributions were in the overall planning with concentration in the definition of the area of Software Integration and Support. We contributed to the planning of multiple meetings, and we contributed to multiple planning documents.
An innovative demonstration of high power density in a compact MHD generator
NASA Astrophysics Data System (ADS)
Lineberry, J. T.; Schmidt, H. J.; Chapman, J. N.
1988-05-01
This document is the first semi-annual report for this project. It has been prepared in accordance with contractual reporting obligations and contains a written summary of the research work which has been performed since the beginning of the project through March 31, 1988. During this period, research work has included a variety of studies on several aspects of the overall project as was needed to scope out the requirements for proceeding with a detailed design of experimental hardware. One of the major objectives of these efforts was to provide a definition of operating conditions that are required to allow this MHD system to meet the program objectives. These background studies encompassed detailed analyses of the combustion of the aluminum/carbon (Al:C) solid fuel and evaluations of the gas dynamic characteristics of the combustion plasma produced by combustion. Another major effort was that of analyses and predictions of the performance of conceptual designs for the MHD generator. Both of these tasks were directed at obtaining necessary information which would allow geometric scaling of the experimental MHD system. A summary of the design studies that were performed is given within the body of this report.
Fission Surface Power System Initial Concept Definition
NASA Technical Reports Server (NTRS)
2010-01-01
Under the NASA Exploration Technology Development Program (ETDP) and in partnership with the Department of Energy (DOE), NASA has embarked on a project to develop Fission Surface Power (FSP) technology. The primary goals of the project are to 1) develop FSP concepts that meet expected surface power requirements at reasonable cost with added benefits over other options, 2) establish a hardwarebased technical foundation for FSP design concepts and reduce overall development risk, 3) reduce the cost uncertainties for FSP and establish greater credibility for flight system cost estimates, and 4) generate the key products to allow NASA decision-makers to consider FSP as a preferred option for flight development. The FSP project was initiated in 2006 as the Prometheus Program and the Jupiter Icy Moons Orbiter (JIMO) mission were phased-out. As a first step, NASA Headquarters commissioned the Affordable Fission Surface Power System Study to evaluate the potential for an affordable FSP development approach. With a cost-effective FSP strategy identified, the FSP team evaluated design options and selected a Preliminary Reference Concept to guide technology development. Since then, the FSP Preliminary Reference Concept has served as a point-of-departure for several NASA mission architecture studies examining the use of nuclear power and has provided the foundation for a series of "Pathfinder" hardware tests. The long-term technology goal is a Technology Demonstration Unit (TDU) integrated system test using full-scale components and a non-nuclear reactor simulator. The FSP team consists of Glenn Research Center (GRC), Marshall Space Flight Center (MSFC) and the DOE National Laboratories at Los Alamos (LANL), Idaho (INL), Oak Ridge (ORNL), and Sandia (SNL). The project is organized into two main elements: Concept Definition and Risk Reduction. Under Concept Definition, the team performs trade studies, develops analytical tools, and formulates system concepts. Under Risk Reduction the team develops hardware prototypes and conducts laboratory-based testing.
Development of a dedicated ethanol ultra-low emission vehicle (ULEV): Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dodge, L.; Bourn, G.; Callahan, T.
The objective of this project was to develop a commercially competitive vehicle powered by ethanol (or an ethanol blend) that can meet California`s ultra-low emission vehicle (ULEV) standards and equivalent corporate average fuel economy (CAFE) energy efficiency for a light-duty passenger car application. The definition of commercially competitive is independent of fuel cost, but does include technical requirements for competitive power, performance, refueling times, vehicle range, driveability, fuel handling safety, and overall emissions performance. This report summarizes the fourth and final phase of this project, and also the overall project. The focus of this report is the technology used tomore » develop a dedicated ethanol-fueled ULEV, and the emissions results documenting ULV performance. Some of the details for the control system and hardware changes are presented in two appendices that are SAE papers. The demonstrator vehicle has a number of advanced technological features, but it is currently configured with standard original equipment manufacturer (OEM) under-engine catalysts. Close-coupled catalysts would improve emissions results further, but no close-coupled catalysts were available for this testing. Recently, close-coupled catalysts were obtained, but installation and testing will be performed in the future. This report also briefly summarizes work in several other related areas that supported the demonstrator vehicle work.« less
Project Success in Agile Development Software Projects
ERIC Educational Resources Information Center
Farlik, John T.
2016-01-01
Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…
Flexible Thermal Protection System Development for Hypersonic Inflatable Aerodynamic Decelerators
NASA Technical Reports Server (NTRS)
DelCorso, Joseph A.; Bruce, Walter E., III; Hughes, Stephen J.; Dec, John A.; Rezin, Marc D.; Meador, Mary Ann B.; Guo, Haiquan; Fletcher, Douglas G.; Calomino, Anthony M.; Cheatwood, McNeil
2012-01-01
The Hypersonic Inflatable Aerodynamic Decelerators (HIAD) project has invested in development of multiple thermal protection system (TPS) candidates to be used in inflatable, high downmass, technology flight projects. Flexible TPS is one element of the HIAD project which is tasked with the research and development of the technology ranging from direct ground tests, modelling and simulation, characterization of TPS systems, manufacturing and handling, and standards and policy definition. The intent of flexible TPS is to enable large deployable aeroshell technologies, which increase the drag performance while significantly reducing the ballistic coefficient of high-mass entry vehicles. A HIAD requires a flexible TPS capable of surviving aerothermal loads, and durable enough to survive the rigors of construction, handling, high density packing, long duration exposure to extrinsic, in-situ environments, and deployment. This paper provides a comprehensive overview of key work being performed within the Flexible TPS element of the HIAD project. Included in this paper is an overview of, and results from, each Flexible TPS research and development activity, which includes ground testing, physics-based thermal modelling, age testing, margins policy, catalysis, materials characterization, and recent developments with new TPS materials.
NASA Technical Reports Server (NTRS)
Simmons, D. B.
1975-01-01
A manual which explains how to use the DOMONIC command language is presented. The manual consists of the following sections: 1. Introduction 2. What You Must Know to Use DOMONIC 3. Functions of DOMONIC 4. Entering and Manipulating Data 5. Templates and Data Definitions 6. Recipes and Document Generation 7. Initiating A Project and 8. Entering and Changing Security Controls. The first four sections must be known by all DOMONIC users. Sections five, seven and eight describe functions normally used only by project management. Section six tells how to generate documents. The manual specifies what commands to use in performing each of the functions mentioned above.
Simple projects guidebook : federal-aid procedure for simple projects
DOT National Transportation Integrated Search
2002-06-01
Experience has shown that a simple project generally 1) does not have any right-of-way involvement and 2) has a Programmatic Categorical Exclusion or Categorical Exclusion environmental determination. Page 7 outlines the definition of simple projects...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Definitions. 279.4 Section 279.4... USE: ESTABLISHMENT OF OBJECTIVES § 279.4 Definitions. For the purposes of this regulation: (a... benefits are the tangible and intangible gains to society directly attributable to a water resource project...
Technology for the future - Long range planning for space technology development
NASA Technical Reports Server (NTRS)
Collier, Lisa D.; Breckenridge, Roger A.; Llewellyn, Charles P.
1992-01-01
NASA's Office of Aeronautics and Space Technology (OAST) has begun the definition of an Integrated Technology Plan for the civilian space program which guides long-term technology development for space platforms, in light of continuing marker research and other planning data. OAST has conferred particular responsibility for future candidate space mission evaluations and platform performance requirement projections to NASA-Langley. An implementation plan is devised which is amenable to periodic space-platform technology updates.
2011-07-01
tissue) or systemic inflammation (fever, leukocytes 12,000/L, elevated C-reactive protein, or elevated erythrocyte sedimentation rate ) or all...elevated erythrocyte sedimentation rate ). Joint/bursa infection Definite: organisms cultured from joint fluid/synovial biopsy or evidence of joint/bursa...McDonald J., Murray C. K., 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) United
Laser Atmospheric Wind Sounder (LAWS) phase 1. Volume 2
NASA Technical Reports Server (NTRS)
1990-01-01
This report summarizes and documents the results of the 12-month phase 1 work effort. The objective of phase 1 was to establish the conceptional definition of the laser atmospheric wind sounder (LAWS) sensor system, including accommodations analyses to ensure compatibility with the Space Station Freedom (SSF) and the Earth Observing System (EOS) Polar Orbiting Platform (POP). Various concepts were investigated with trade studies performed to select the configuration to be carried forward to the phase 2 Preliminary Design Definition. A summary of the LAWS system and subsystem trade studies that were performed leading to the baseline design configuration is presented in the appendix. The overall objective of the LAWS Project is to define, design, and implement an operational space based facility, LAWS, for accurate measurement of Earth wind profiles. Phase 1 addressed three major areas: (1) requirements definition; (2) instrument concepts and configurations; and (3) performance analysis. For the LAWS instrument concepts and configurations, the issues which press the technological state of the art are reliable detector lifetime and laser performance and lifetime. Lag angle compensation, pointing accuracy, satellite navigation, and telescope design are significant technical issues, but they are considered to be currently state of the art. The primary issues for performance analysis concern interaction with the atmosphere in terms of backscatter and attenuation, wind variance, and cloud blockage. The phase 1 tasks were formulated to address these significant technical issues and demonstrate the technical feasibility of the LAWS concept. Primary emphasis was placed on analysis/trade and identification of candidate concepts. Promising configurations were evaluated for performance, sensitivities, risks, and budgetary costs. Lockheed's baseline LAWS configuration is presented.
49 CFR 633.21 - Basic requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.21 Basic requirement. (a) If a project meets the definition of major capital project, the recipient shall submit a project management plan prepared in accordance with § 633.25 of this part, as a condition of Federal financial...
49 CFR 633.21 - Basic requirement.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.21 Basic requirement. (a) If a project meets the definition of major capital project, the recipient shall submit a project management plan prepared in accordance with § 633.25 of this part, as a condition of Federal financial...
49 CFR 633.21 - Basic requirement.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.21 Basic requirement. (a) If a project meets the definition of major capital project, the recipient shall submit a project management plan prepared in accordance with § 633.25 of this part, as a condition of Federal financial...
49 CFR 633.21 - Basic requirement.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.21 Basic requirement. (a) If a project meets the definition of major capital project, the recipient shall submit a project management plan prepared in accordance with § 633.25 of this part, as a condition of Federal financial...
49 CFR 633.21 - Basic requirement.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.21 Basic requirement. (a) If a project meets the definition of major capital project, the recipient shall submit a project management plan prepared in accordance with § 633.25 of this part, as a condition of Federal financial...
Building thermography as a tool in energy audits and building commissioning procedure
NASA Astrophysics Data System (ADS)
Kauppinen, Timo
2007-04-01
A Building Commissioning-project (ToVa) was launched in Finland in the year 2003. A comprehensive commissioning procedure, including the building process and operation stage was developed in the project. This procedure will confirm the precise documentation of client's goals, definition of planning goals and the performance of the building. It is rather usual, that within 1-2 years after introduction the users complain about the defects or performance malfunctions of the building. Thermography is one important manual tool in verifying the thermal performance of the building envelope. In this paper the results of one pilot building (a school) will be presented. In surveying the condition and energy efficiency of buildings, various auxiliary means are needed. We can compare the consumption data of the target building with other, same type of buildings by benchmarking. Energy audit helps to localize and determine the energy saving potential. The most general and also most effective auxiliary means in monitoring the thermal performance of building envelopes is an infrared camera. In this presentation some examples of the use of thermography in energy audits are presented.
Code of Federal Regulations, 2010 CFR
2010-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION TRANSPORTATION INFRASTRUCTURE MANAGEMENT PROJECTS OF... under this program: (a) A project meeting the definition of an eligible project under 505.5 of this section located fully within one State shall have eligible project costs that are quantified in the...
Code of Federal Regulations, 2012 CFR
2012-07-01
... ADMINISTRATIVE REVIEW PROCESSES Predecisional Administrative Review Process for Hazardous Fuel Reduction Projects... reduction project: A hazardous fuel reduction project authorized by the Healthy Forests Restoration Act of... reduction project pursuant to the HFRA. Decision notice (DN): A concise written record of a responsible...
Library Digitisation Project Management.
ERIC Educational Resources Information Center
Middleton, Michael
Supervision of library digitization is the focus of this paper. First outlined are the definition, formalization, implementation, and completion phases of project management. Descriptions of management decisions involved in digitization projects follow on matters such as: collection analysis, resourcing, project personnel, production, access and…
7 CFR 1207.311 - Programs and projects.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POTATO RESEARCH AND PROMOTION PLAN Potato Research and Promotion Plan Definitions § 1207.311 Programs and projects. Programs and projects mean those research, development, advertising or promotion programs or projects developed by the...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false Definitions. 124.2 Section 124.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and Modernization § 124.2 Definitions. As used in this...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false Definitions. 124.2 Section 124.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and Modernization § 124.2 Definitions. As used in this...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false Definitions. 124.2 Section 124.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and Modernization § 124.2 Definitions. As used in this...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false Definitions. 124.2 Section 124.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and Modernization § 124.2 Definitions. As used in this...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 1 2013-10-01 2013-10-01 false Definitions. 124.2 Section 124.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT MEDICAL FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and Modernization § 124.2 Definitions. As used in this...
Code of Federal Regulations, 2010 CFR
2010-04-01
... ENVIRONMENTAL CRITERIA AND STANDARDS Siting of HUD Assisted Projects in Runway Clear Zones at Civil Airports and Clear Zones and Accident Potential Zones at Military Airfields § 51.301 Definitions. For the purposes of... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Definitions. 51.301 Section 51.301...
Code of Federal Regulations, 2014 CFR
2014-04-01
... ENVIRONMENTAL CRITERIA AND STANDARDS Siting of HUD Assisted Projects in Runway Clear Zones at Civil Airports and Clear Zones and Accident Potential Zones at Military Airfields § 51.301 Definitions. For the purposes of... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Definitions. 51.301 Section 51.301...
Code of Federal Regulations, 2012 CFR
2012-04-01
... ENVIRONMENTAL CRITERIA AND STANDARDS Siting of HUD Assisted Projects in Runway Clear Zones at Civil Airports and Clear Zones and Accident Potential Zones at Military Airfields § 51.301 Definitions. For the purposes of... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Definitions. 51.301 Section 51.301...
Code of Federal Regulations, 2011 CFR
2011-04-01
... ENVIRONMENTAL CRITERIA AND STANDARDS Siting of HUD Assisted Projects in Runway Clear Zones at Civil Airports and Clear Zones and Accident Potential Zones at Military Airfields § 51.301 Definitions. For the purposes of... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Definitions. 51.301 Section 51.301...
Code of Federal Regulations, 2013 CFR
2013-04-01
... ENVIRONMENTAL CRITERIA AND STANDARDS Siting of HUD Assisted Projects in Runway Clear Zones at Civil Airports and Clear Zones and Accident Potential Zones at Military Airfields § 51.301 Definitions. For the purposes of... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Definitions. 51.301 Section 51.301...
34 CFR 379.5 - What definitions apply?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 34 Education 2 2014-07-01 2013-07-01 true What definitions apply? 379.5 Section 379.5 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION PROJECTS WITH INDUSTRY General § 379.5 What definitions apply...
34 CFR 379.5 - What definitions apply?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 2 2010-07-01 2010-07-01 false What definitions apply? 379.5 Section 379.5 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION PROJECTS WITH INDUSTRY General § 379.5 What definitions apply...
34 CFR 379.5 - What definitions apply?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 34 Education 2 2012-07-01 2012-07-01 false What definitions apply? 379.5 Section 379.5 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION PROJECTS WITH INDUSTRY General § 379.5 What definitions apply...
34 CFR 379.5 - What definitions apply?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 34 Education 2 2013-07-01 2013-07-01 false What definitions apply? 379.5 Section 379.5 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION PROJECTS WITH INDUSTRY General § 379.5 What definitions apply...
Code of Federal Regulations, 2010 CFR
2010-04-01
... of Transportation (DOT) and is available on the DOT web site at http://www.its.dot.gov. Project level... projects or groups of projects. Systems engineering is a structured process for arriving at a final design...
Code of Federal Regulations, 2011 CFR
2011-04-01
... of Transportation (DOT) and is available on the DOT web site at http://www.its.dot.gov. Project level... projects or groups of projects. Systems engineering is a structured process for arriving at a final design...
E-Psychology: Consumers' Attitude
NASA Astrophysics Data System (ADS)
Jordanova, Malina; Vasileva, Lidia; Rasheva, Maximka; Bojinova, Rumiana
Securing psychological supervision, consultations and help during long lasting flights is vital condition for success. That's why, knowing in details consumers (clients) attitude toward virtual psychology services is essential. Knowledge gained during nowadays studies on Earth will definitely help in the preparation for the future. The presentation focuses on results of a longitudinal survey assessing clients' attitudes toward e-psychology service. The first part of the survey was performed in spring 2006, while the second - in 2008. The study is part of an ongoing project OHN 1514/2005, funded by National Science Fund, Bulgaria. Project's strategic goal is to develop and offer a virtual high quality psychological service to people from remotes areas that have no contact with licensed psychologist. The project enables experts to communicate directly with clients and perform remote consultations, supervision, etc. The objective of this presentation is to report changes and trends in clients' attitude towards innovative virtual psychology care. Both parts of the survey involved men and women between 19 and 70 year, who defend various opinions on the application of virtual technologies for healthcare. The sample is stratifies for age, gender, education level.
7 CFR 622.11 - Eligible watershed projects.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 6 2014-01-01 2014-01-01 false Eligible watershed projects. 622.11 Section 622.11..., DEPARTMENT OF AGRICULTURE WATER RESOURCES WATERSHED PROJECTS Qualifications § 622.11 Eligible watershed projects. (a) To be eligible for Federal assistance, a watershed project must: (1) Meet the definition of a...
Code of Federal Regulations, 2014 CFR
2014-07-01
... a fee interest in real property on which a proposed project is planned to be located. Military... ensure that a project does not create an unacceptable risk to the national security of the United States. Proposed project. A proposed project is the project as described in the application submitted to the...
Code of Federal Regulations, 2012 CFR
2012-10-01
... restore the Project to a former good operating condition. Colorado River Dam Fund or Fund shall mean that... specified in the Project Act, the Adjustment Act, the Colorado River Basin Project Act, and the Hoover Power... electric service pursuant to the Hoover Power Plant Act. Project or Boulder Canyon Project shall mean all...
Code of Federal Regulations, 2013 CFR
2013-10-01
... restore the Project to a former good operating condition. Colorado River Dam Fund or Fund shall mean that... specified in the Project Act, the Adjustment Act, the Colorado River Basin Project Act, and the Hoover Power... electric service pursuant to the Hoover Power Plant Act. Project or Boulder Canyon Project shall mean all...
Code of Federal Regulations, 2010 CFR
2010-10-01
... restore the Project to a former good operating condition. Colorado River Dam Fund or Fund shall mean that... specified in the Project Act, the Adjustment Act, the Colorado River Basin Project Act, and the Hoover Power... electric service pursuant to the Hoover Power Plant Act. Project or Boulder Canyon Project shall mean all...
Code of Federal Regulations, 2011 CFR
2011-10-01
... restore the Project to a former good operating condition. Colorado River Dam Fund or Fund shall mean that... specified in the Project Act, the Adjustment Act, the Colorado River Basin Project Act, and the Hoover Power... electric service pursuant to the Hoover Power Plant Act. Project or Boulder Canyon Project shall mean all...
Code of Federal Regulations, 2014 CFR
2014-10-01
... restore the Project to a former good operating condition. Colorado River Dam Fund or Fund shall mean that... specified in the Project Act, the Adjustment Act, the Colorado River Basin Project Act, and the Hoover Power... electric service pursuant to the Hoover Power Plant Act. Project or Boulder Canyon Project shall mean all...
Methodological Ambiguities of the Projective Technique: An Overview and Attempt to Clarify.
ERIC Educational Resources Information Center
Veiel, H.; Coles, E. M.
1982-01-01
Definitions of projective tests are critiqued. A distinction is made between projective tests and projective techniques. The unique feature of the latter is its scoring process: response categories are intensionally defined and comprise infinite sets of responses. A continuity from psychometric to projective tests is argued. Statistical…
Dose reduction potential of iterative reconstruction algorithms in neck CTA-a simulation study.
Ellmann, Stephan; Kammerer, Ferdinand; Allmendinger, Thomas; Brand, Michael; Janka, Rolf; Hammon, Matthias; Lell, Michael M; Uder, Michael; Kramer, Manuel
2016-10-01
This study aimed to determine the degree of radiation dose reduction in neck CT angiography (CTA) achievable with Sinogram-affirmed iterative reconstruction (SAFIRE) algorithms. 10 consecutive patients scheduled for neck CTA were included in this study. CTA images of the external carotid arteries either were reconstructed with filtered back projection (FBP) at full radiation dose level or underwent simulated dose reduction by proprietary reconstruction software. The dose-reduced images were reconstructed using either SAFIRE 3 or SAFIRE 5 and compared with full-dose FBP images in terms of vessel definition. 5 observers performed a total of 3000 pairwise comparisons. SAFIRE allowed substantial radiation dose reductions in neck CTA while maintaining vessel definition. The possible levels of radiation dose reduction ranged from approximately 34 to approximately 90% and depended on the SAFIRE algorithm strength and the size of the vessel of interest. In general, larger vessels permitted higher degrees of radiation dose reduction, especially with higher SAFIRE strength levels. With small vessels, the superiority of SAFIRE 5 over SAFIRE 3 was lost. Neck CTA can be performed with substantially less radiation dose when SAFIRE is applied. The exact degree of radiation dose reduction should be adapted to the clinical question, in particular to the smallest vessel needing excellent definition.
Effectiveness evaluation of the R&D projects in organizations financed by the budget expenses
NASA Astrophysics Data System (ADS)
Yakovlev, D.; Yushkov, E.; Pryakhin, A.; Bogatyreova, M.
2017-01-01
The issues of R&D project performance and their prospects are closely concerned with knowledge management. In the initial stages of the project development, it is the quality of the project evaluation that is crucial for the result and generation of future knowledge. Currently there does not exist any common methodology for the evaluation of new R&D financed by the budget. Suffice it to say, the assessment of scientific and technical projects (ST projects) varies greatly depending on the type of customer - government or business structures. An extensive methodological groundwork was formed with respect to orders placed by business structures. It included “an internal administrative order” by the company management for the results of STA intended for its own ST divisions. Regretfully this is not the case with state orders in the field of STA although the issue requires state regulation and official methodological support. The article is devoted to methodological assessment of scientific and technical effectiveness of studies performed at the expense of budget funds, and suggests a new concept based on the definition of the cost-effectiveness index. Thus, the study reveals it necessary to extend the previous approach to projects of different levels - micro-, meso-, macro projects. The preliminary results of the research show that there must be a common methodological approach to underpin the financing of projects under government contracts within the framework of budget financing and stock financing. This should be developed as general guidelines as well as recommendations that reflect specific sectors of the public sector, various project levels and forms of financing, as well as different stages of project life cycle.
Code of Federal Regulations, 2010 CFR
2010-04-01
... SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR PERSONS WITH DISABILITIES... Program for the Disposition of HUD-Owned Projects § 886.302 Definitions. The terms Fair Market Rent (FMR...
Udo, Renate; Tcherny-Lessenot, Stéphanie; Brauer, Ruth; Dolin, Paul; Irvine, David; Wang, Yunxun; Auclert, Laurent; Juhaeri, Juhaeri; Kurz, Xavier; Abenhaim, Lucien; Grimaldi, Lamiae; De Bruin, Marie L
2016-03-01
To examine the robustness of findings of case-control studies on the association between acute liver injury (ALI) and antibiotic use in the following different situations: (i) Replication of a protocol in different databases, with different data types, as well as replication in the same database, but performed by a different research team. (ii) Varying algorithms to identify cases, with and without manual case validation. (iii) Different exposure windows for time at risk. Five case-control studies in four different databases were performed with a common study protocol as starting point to harmonize study outcome definitions, exposure definitions and statistical analyses. All five studies showed an increased risk of ALI associated with antibiotic use ranging from OR 2.6 (95% CI 1.3-5.4) to 7.7 (95% CI 2.0-29.3). Comparable trends could be observed in the five studies: (i) without manual validation the use of the narrowest definition for ALI showed higher risk estimates, (ii) narrow and broad algorithm definitions followed by manual validation of cases resulted in similar risk estimates, and (iii) the use of a larger window (30 days vs 14 days) to define time at risk led to a decrease in risk estimates. Reproduction of a study using a predefined protocol in different database settings is feasible, although assumptions had to be made and amendments in the protocol were inevitable. Despite differences, the strength of association was comparable between the studies. In addition, the impact of varying outcome definitions and time windows showed similar trends within the data sources. Copyright © 2015 John Wiley & Sons, Ltd.
A new metaphor for projection-based visual analysis and data exploration
NASA Astrophysics Data System (ADS)
Schreck, Tobias; Panse, Christian
2007-01-01
In many important application domains such as Business and Finance, Process Monitoring, and Security, huge and quickly increasing volumes of complex data are collected. Strong efforts are underway developing automatic and interactive analysis tools for mining useful information from these data repositories. Many data analysis algorithms require an appropriate definition of similarity (or distance) between data instances to allow meaningful clustering, classification, and retrieval, among other analysis tasks. Projection-based data visualization is highly interesting (a) for visual discrimination analysis of a data set within a given similarity definition, and (b) for comparative analysis of similarity characteristics of a given data set represented by different similarity definitions. We introduce an intuitive and effective novel approach for projection-based similarity visualization for interactive discrimination analysis, data exploration, and visual evaluation of metric space effectiveness. The approach is based on the convex hull metaphor for visually aggregating sets of points in projected space, and it can be used with a variety of different projection techniques. The effectiveness of the approach is demonstrated by application on two well-known data sets. Statistical evidence supporting the validity of the hull metaphor is presented. We advocate the hull-based approach over the standard symbol-based approach to projection visualization, as it allows a more effective perception of similarity relationships and class distribution characteristics.
Measuring and tracking the flow of climate change adaptation aid to the developing world
NASA Astrophysics Data System (ADS)
Donner, Simon D.; Kandlikar, Milind; Webber, Sophie
2016-05-01
The developed world has pledged to mobilize at least US 100 billion per year of ‘new’ and ‘additional’ funds by 2020 to help the developing world respond to climate change. Tracking this finance is particularly problematic for climate change adaptation, as there is no clear definition of what separates adaptation aid from standard development aid. Here we use a historical database of overseas development assistance projects to test the effect of different accounting assumptions on the delivery of adaptation finance to the developing countries of Oceania, using machine algorithms developed from a manual pilot study. The results show that explicit adaptation finance grew to 3%-4% of all development aid to Oceania by the 2008-2012 period, but that total adaptation finance could be as high as 37% of all aid, depending on potentially politically motivated assumptions about what counts as adaptation. There was also an uneven distribution of adaptation aid between countries facing similar challenges like Kiribati, the Marshall Islands, and the Federated States of Micronesia. The analysis indicates that data allowing individual projects to be weighted by their climate change relevance is needed. A robust and mandatory metadata system for all aid projects would allow multilateral aid agencies and independent third parties to perform their own analyses using different assumptions and definitions, and serve as a key check on international climate aid promises.
NASA Technical Reports Server (NTRS)
Mckay, Charles
1991-01-01
This is the configuration management Plan for the AdaNet Repository Based Software Engineering (RBSE) contract. This document establishes the requirements and activities needed to ensure that the products developed for the AdaNet RBSE contract are accurately identified, that proposed changes to the product are systematically evaluated and controlled, that the status of all change activity is known at all times, and that the product achieves its functional performance requirements and is accurately documented.
1993-12-01
Iaporta .. y be definitive for the tubjoct proaentod, exploratory in natura, or an evaluation of critical Aubayato• or of technical problema , 4...International Security 9 Social and Natural Science Studies Field 41 Edit: (Type 3) -Entry of an invalid code when Performance Type is "C" or "M" will...analysis SF Foreign area social science research SP Foreign area policy planAing research BF Identifies databases with data on foreign forces or
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carlson, T.A., Fluor Daniel Hanford
1997-02-06
The Immobilized Low-Activity Waste Interim Storage subproject will provide storage capacity for immobilized low-activity waste product sold to the U.S. Department of Energy by the privatization contractor. This statement of work describes the work scope (encompassing definition of new installations and retrofit modifications to four existing grout vaults), to be performed by the Architect-Engineer, in preparation of a conceptual design for the Immobilized Low-Activity Waste Interim Storage Facility.
Toxic Hazards Research Unit Annual Technical Report: 1982
1982-09-01
AFAMRL-TR-82-62 TOXIC HAZARDS RESEARCH UNIT ANNUAL TECHNICAL REPORT: 1962 J. D . MacERWI E. H. VRNOT UN! VERWflY OF CALIFORIA, IR V2VE P.O. BOX 3067...Government d .-auings, spec f&c-atons, o other data 2re used for an-, pirpose other than a definitely related Government procurement operation, the...GRANT NUMBER(s) J. D . MacEwen, E. H. Vernot F33615-80-C-0512 9 PERFORMING ORGANIZATION NAME: AND ADDRESS 10 PROGRAM ELEMENT. PROJECT. TASK University of
24 CFR 5.318 - Discretionary pet rules.
Code of Federal Regulations, 2010 CFR
2010-04-01
... PHAs may include, but are not limited to, consideration of the following factors: (a) Definitions of... reasonable definition of a common household pet. (2) For Housing programs. Project owners wishing to define “common household pet” in their pet rules must use the Housing programs definition of the term in § 5.306...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 1 2013-10-01 2013-10-01 false Definitions. 51a.2 Section 51a.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS PROJECT GRANTS FOR MATERNAL AND CHILD HEALTH § 51a.2 Definitions. Act means the Social Security Act, as amended. Genetic diseases means...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false Definitions. 51a.2 Section 51a.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS PROJECT GRANTS FOR MATERNAL AND CHILD HEALTH § 51a.2 Definitions. Act means the Social Security Act, as amended. Genetic diseases means...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false Definitions. 51a.2 Section 51a.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS PROJECT GRANTS FOR MATERNAL AND CHILD HEALTH § 51a.2 Definitions. Act means the Social Security Act, as amended. Genetic diseases means...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false Definitions. 51a.2 Section 51a.2 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS PROJECT GRANTS FOR MATERNAL AND CHILD HEALTH § 51a.2 Definitions. Act means the Social Security Act, as amended. Genetic diseases means...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Definitions. 24.2 Section 24.2 Banks and... ENTITIES, COMMUNITY DEVELOPMENT PROJECTS, AND OTHER PUBLIC WELFARE INVESTMENTS § 24.2 Definitions. For... adequately capitalized in 12 CFR 6.4. (b) Capital and surplus means: (1) A bank's Tier 1 and Tier 2 capital...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 2 Grants and Agreements 1 2014-01-01 2014-01-01 false Project cost. 200.83 Section 200.83 Grants... AND BUDGET GUIDANCE Reserved UNIFORM ADMINISTRATIVE REQUIREMENTS, COST PRINCIPLES, AND AUDIT REQUIREMENTS FOR FEDERAL AWARDS Acronyms and Definitions Acronyms § 200.83 Project cost. Project cost means...
The HEALTHGRAIN definition of ‘whole grain’
van der Kamp, Jan Willem; Poutanen, Kaisa; Seal, Chris J.; Richardson, David P.
2014-01-01
Most cereal products, like white bread, pasta, and biscuits, are based on flour after removal of bran and germ, the two parts of grain kernels containing most of the dietary fibre and other bioactive components. In the past decade, consumers have been rediscovering whole grain-based products and the number of wholegrain products has increased rapidly. In most countries in Europe and worldwide, however, no legally endorsed definition of wholegrain flour and products exists. Current definitions are often incomplete, lacking descriptions of the included grains and the permitted flour manufacturing processes. The consortium of the HEALTHGRAIN EU project (FP6-514008, 2005–2010) identified the need for developing a definition of whole grain with the following scope: 1) more comprehensive than current definitions in most EU countries; 2) one definition for Europe – when possible equal to definitions outside Europe; 3) reflecting current industrial practices for production of flours and consumer products; 4) useful in the context of nutritional guidelines and for labelling purposes. The definition was developed in a range of discussion meetings and consultations and was launched in 2010 at the end of the HEALTHGRAIN project. The grains included are specified: a wide range of cereal grains from the Poaceae family, and the pseudo-cereals amaranth, buckwheat, quinoa, and wild rice. The definition also describes manufacturing processes allowed for producing wholegrain flours. This paper compares the HEALTHGRAIN definition with previous definitions, provides more comprehensive explanations than in the definition itself regarding the inclusion of specific grains, and sets out the permitted flour manufacturing processes. PMID:24505218
Project FARE Task V : Industry Control Board Meeting (ICB-1)
DOT National Transportation Integrated Search
1975-12-16
Under Project FARE (Financial Accounting and Reporting Elements, (IT-06-0034), uniform standards, definitions, and procedures for reporting, financial and operating data by the urban transit industry were developed. The objective of this project was ...
De Luca, Daniele; van Kaam, Anton H; Tingay, David G; Courtney, Sherry E; Danhaive, Olivier; Carnielli, Virgilio P; Zimmermann, Luc J; Kneyber, Martin C J; Tissieres, Pierre; Brierley, Joe; Conti, Giorgio; Pillow, Jane J; Rimensberger, Peter C
2017-08-01
Acute respiratory distress syndrome (ARDS) is undefined in neonates, despite the long-standing existing formal recognition of ARDS syndrome in later life. We describe the Neonatal ARDS Project: an international, collaborative, multicentre, and multidisciplinary project which aimed to produce an ARDS consensus definition for neonates that is applicable from the perinatal period. The definition was created through discussions between five expert members of the European Society for Paediatric and Neonatal Intensive Care; four experts of the European Society for Paediatric Research; two independent experts from the USA and two from Australia. This Position Paper provides the first consensus definition for neonatal ARDS (called the Montreux definition). We also provide expert consensus that mechanisms causing ARDS in adults and older children-namely complex surfactant dysfunction, lung tissue inflammation, loss of lung volume, increased shunt, and diffuse alveolar damage-are also present in several critical neonatal respiratory disorders. Copyright © 2017 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Seyler, F.; Bonnet, M.-P.; Calmant, S.; Cauhopé, M.; Cazenave, A.; Cochonneau, G.; Divol, J.; Do-Minh, K.; Frappart, F.; Gennero, M.-C.; Guyenne-Blin, K.; Huynh, F.; Leon, J. G.; Mangeas, M.; Mercier, F.; Rocquelain, GH.; Tocqueville, L.; Zanifé, O.-Z.
2006-07-01
CASH « Contribution of spatial altimetry to hydrology » aims at the definition of a global, standard, fast and long term access to a set of hydrological data concerning the greatest river basins in the world. The key questions to be answered are: what are the conditions for monitoring river water stages from altimetric radar data and how is it possible to combine altimetric data with other spatial sources or/and in-situ data in order to deliver useful parameters for hydrology community, both scientific and end users. The CASH project is ending mid-May of 2006 and there is yet a lot of tasks to be performed for altimetric heigths of continental water bodies becoming part of the scientific and end-users hydrologists day-to- day practice. The project has nethertheless delineated the way this use could be improved in a near future, and opened very interesting perspectives for ungauged or poorly gauged great basins in the world.
Proposed Project Selection Method for Human Support Research and Technology Development (HSR&TD)
NASA Technical Reports Server (NTRS)
Jones, Harry
2005-01-01
The purpose of HSR&TD is to deliver human support technologies to the Exploration Systems Mission Directorate (ESMD) that will be selected for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are acceptable. HSR&TD must select an may of technology development projects, guide them, and either terminate or continue them, so as to maximize the resulting number of usable advanced human support technologies. This paper proposes an effective project scoring methodology to support managing the HSR&TD project portfolio. Researchers strongly disagree as to what are the best technology project selection methods, or even if there are any proven ones. Technology development is risky and outstanding achievements are rare and unpredictable. There is no simple formula for success. Organizations that are satisfied with their project selection approach typically use a mix of financial, strategic, and scoring methods in an open, established, explicit, formal process. This approach helps to build consensus and develop management insight. It encourages better project proposals by clarifying the desired project attributes. We propose a project scoring technique based on a method previously used in a federal laboratory and supported by recent research. Projects are ranked by their perceived relevance, risk, and return - a new 3 R's. Relevance is the degree to which the project objective supports the HSR&TD goal of developing usable advanced human support technologies. Risk is the estimated probability that the project will achieve its specific objective. Return is the reduction in mission life cycle cost obtained if the project is successful. If the project objective technology performs a new function with no current cost, its return is the estimated cash value of performing the new function. The proposed project selection scoring method includes definitions of the criteria, a project evaluation questionnaire, and a scoring formula.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Regulation. Project Manager. The government manager for the prototype project. Qualified Independent Public... the Army—Assistant Secretary of the Army (Acquisition, Logistics and Technology); (2) Department of...
The ISIS project: Fault-tolerance in large distributed systems
NASA Technical Reports Server (NTRS)
Birman, Kenneth P.; Marzullo, Keith
1990-01-01
The semi-annual status report covers activities of the ISIS project during the second half of 1989. The project had several independent objectives: (1) At the level of the ISIS Toolkit, ISIS release V2.0 was completed, containing bypass communication protocols. Performance of the system is greatly enhanced by this change, but the initial software release is limited in some respects. (2) The Meta project focused on the definition of the Lomita programming language for specifying rules that monitor sensors for conditions of interest and triggering appropriate reactions. This design was completed, and implementation of Lomita is underway on the Meta 2.0 platform. (3) The Deceit file system effort completed a prototype. It is planned to make Deceit available for use in two hospital information systems. (4) A long-haul communication subsystem project was completed and can be used as part of ISIS. This effort resulted in tools for linking ISIS systems on different LANs together over long-haul communications lines. (5) Magic Lantern, a graphical tool for building application monitoring and control interfaces, is included as part of the general ISIS releases.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Piscotty, M A; Nazario, O L
2007-06-20
The objective of this project is the delivery of an application that will provide a unified, web-based system for collecting, verifying and analyzing the achievements for Laboratory employees. The application will enable individual Directorates to manage and report achievement record data for their employees using an LLNL standard web browser. In addition, cross directorate data reporting and analysis will be available for such organizations as LSTO and programmatic directorates. This system is intended to store reference data and metadata for employee achievements. Abstracts and entire publications will not be stored in this system.Directorates are expected to use this system atmore » all levels of management in preparing for Annual Self-Assessments, peer reviews, LDRD reviews, work force reviews, performance appraisals, and requests from sponsors. This document represents the primary deliverable for the Requirements Definition stage of system development. As part of a successful Requirements Definition, this document provides the development staff, the project sponsor, and the user community with a clear understanding of the product's operational, data, and other requirements. With this understanding, the development staff will take the opportunity to refine estimates regarding the cost, schedule, and deliverables reflected in it.« less
Nonlinear Semi-Supervised Metric Learning Via Multiple Kernels and Local Topology.
Li, Xin; Bai, Yanqin; Peng, Yaxin; Du, Shaoyi; Ying, Shihui
2018-03-01
Changing the metric on the data may change the data distribution, hence a good distance metric can promote the performance of learning algorithm. In this paper, we address the semi-supervised distance metric learning (ML) problem to obtain the best nonlinear metric for the data. First, we describe the nonlinear metric by the multiple kernel representation. By this approach, we project the data into a high dimensional space, where the data can be well represented by linear ML. Then, we reformulate the linear ML by a minimization problem on the positive definite matrix group. Finally, we develop a two-step algorithm for solving this model and design an intrinsic steepest descent algorithm to learn the positive definite metric matrix. Experimental results validate that our proposed method is effective and outperforms several state-of-the-art ML methods.
NASA Technical Reports Server (NTRS)
1976-01-01
The following areas related to the final definition and preliminary design study of the initial atmospheric cloud physics laboratory (ACPL) were covered: (1) proposal organization, personnel, schedule, and project management, (2) proposed configurations, (3) study objectives, (4) ACPL experiment program listing and description, (5) mission/flight flexibility and modularity/commonality, (6) study plan, and (7) description of following tasks: requirement analysis and definition task flow, systems analysis and trade studies, subsystem analysis and trade studies, specifications and interface control documents, preliminary design task flow, work breakdown structure, programmatic analysis and planning, and project costs. Finally, an overview of the scientific requirements was presented.
Interactions Measurement Payload for Shuttle (IMPS) Definition Phase Study.
1984-12-15
7 -AS5 222 INTERACTIONS MEASUREMENT PAYLOAD FOR SHUTTLE (IMPS) 1/3 DEFINITION PHASE STUDY(U) JET PROPULSION LAB PASADENA CA G C HILL 15 DEC 84 JPL-D...OF FUNDING NOS. PROGRAM PROJECT TASK WORK UNIT ELEMENT NO. NO NO. NO. S 11 TITLE fnciude Security Classficalion Interactions Measure 63410F 1822 01...block number, d tor Shuttle The Interactions Measurement Payload for hyttle (IMPS) project will study interactions between large space vehicles, such as
ERIC Educational Resources Information Center
Holmgren, Jennifer; Lamb, Jennifer; Miller, Megan; Werderitch, Christina
2011-01-01
This action research project report was conducted at a middle school from August 30, 2010 to December 17, 2010. The purpose of this research project was to decrease bullying behaviors through discussing literature, role-playing, and establishing a definition of bullying in accordance with a common set of rules. There were four teacher researchers…
Developing and Testing a Model to Predict Outcomes of Organizational Change
Gustafson, David H; Sainfort, François; Eichler, Mary; Adams, Laura; Bisognano, Maureen; Steudel, Harold
2003-01-01
Objective To test the effectiveness of a Bayesian model employing subjective probability estimates for predicting success and failure of health care improvement projects. Data Sources Experts' subjective assessment data for model development and independent retrospective data on 221 healthcare improvement projects in the United States, Canada, and the Netherlands collected between 1996 and 2000 for validation. Methods A panel of theoretical and practical experts and literature in organizational change were used to identify factors predicting the outcome of improvement efforts. A Bayesian model was developed to estimate probability of successful change using subjective estimates of likelihood ratios and prior odds elicited from the panel of experts. A subsequent retrospective empirical analysis of change efforts in 198 health care organizations was performed to validate the model. Logistic regression and ROC analysis were used to evaluate the model's performance using three alternative definitions of success. Data Collection For the model development, experts' subjective assessments were elicited using an integrative group process. For the validation study, a staff person intimately involved in each improvement project responded to a written survey asking questions about model factors and project outcomes. Results Logistic regression chi-square statistics and areas under the ROC curve demonstrated a high level of model performance in predicting success. Chi-square statistics were significant at the 0.001 level and areas under the ROC curve were greater than 0.84. Conclusions A subjective Bayesian model was effective in predicting the outcome of actual improvement projects. Additional prospective evaluations as well as testing the impact of this model as an intervention are warranted. PMID:12785571
7 CFR 1220.117 - Plans and projects.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE SOYBEAN PROMOTION, RESEARCH, AND CONSUMER INFORMATION Soybean Promotion and Research Order Definitions § 1220.117 Plans and projects. Plans...
7 CFR 1220.117 - Plans and projects.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE SOYBEAN PROMOTION, RESEARCH, AND CONSUMER INFORMATION Soybean Promotion and Research Order Definitions § 1220.117 Plans and projects. Plans...
7 CFR 1207.311 - Programs and projects.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POTATO RESEARCH AND PROMOTION PLAN Potato Research and Promotion Plan Definitions § 1207.311 Programs and projects. Programs and...
7 CFR 1207.311 - Programs and projects.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POTATO RESEARCH AND PROMOTION PLAN Potato Research and Promotion Plan Definitions § 1207.311 Programs and projects. Programs and...
7 CFR 1207.311 - Programs and projects.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POTATO RESEARCH AND PROMOTION PLAN Potato Research and Promotion Plan Definitions § 1207.311 Programs and projects. Programs and...
7 CFR 1207.311 - Programs and projects.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POTATO RESEARCH AND PROMOTION PLAN Potato Research and Promotion Plan Definitions § 1207.311 Programs and projects. Programs and...
24 CFR 241.1005 - Definitions.
Code of Federal Regulations, 2010 CFR
2010-04-01
... SUPPLEMENTARY FINANCING FOR INSURED PROJECT MORTGAGES Insurance for Equity Loans and Acquisition Loans... qualified purchaser of an eligible low income housing project, which owner receives and becomes primarily... organization or a limited equity cooperative, which entity is purchasing an eligible low income housing project...
Code of Federal Regulations, 2011 CFR
2011-01-01
... structures from a microburst wind occurrence in calendar year 1992. Commercially available. Energy projects... energy production, wood waste and wood residues, plants, including aquatic plants and grasses, fibers.... Commercially available projects that produce or distribute energy or power and/or projects that produce biomass...
7 CFR 1250.314 - Plans and projects.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE EGG RESEARCH AND PROMOTION Egg Research and Promotion Order Definitions § 1250.314 Plans and projects. Plans and projects means those research, consumer and producer education, advertising, marketing, product development, and promotion plans...
Correspondence about the Applicability of Asbestos NESHAP to Residential Demolition Projects
These correspondence about the asbestos NESHAP provide clarification on some demolition concerns such as the definition of a facility, the definition of site, and ownership applicability for renovations conducted on buildings after resale.
Code of Federal Regulations, 2014 CFR
2014-07-01
... motivated, disciplined employees. Information technology (IT) as defined means use of computers, ancillary... technology, including occupational specialty areas such as systems administration, IT project management... PILOT PROGRAM FOR TEMPORARY EXCHANGE OF INFORMATION TECHNOLOGY PERSONNEL § 241.2 Definitions. In this...
Code of Federal Regulations, 2013 CFR
2013-07-01
... motivated, disciplined employees. Information technology (IT) as defined means use of computers, ancillary... technology, including occupational specialty areas such as systems administration, IT project management... PILOT PROGRAM FOR TEMPORARY EXCHANGE OF INFORMATION TECHNOLOGY PERSONNEL § 241.2 Definitions. In this...
Sedentary Behavior Research Network (SBRN) - Terminology Consensus Project process and outcome.
Tremblay, Mark S; Aubert, Salomé; Barnes, Joel D; Saunders, Travis J; Carson, Valerie; Latimer-Cheung, Amy E; Chastin, Sebastien F M; Altenburg, Teatske M; Chinapaw, Mai J M
2017-06-10
The prominence of sedentary behavior research in health science has grown rapidly. With this growth there is increasing urgency for clear, common and accepted terminology and definitions. Such standardization is difficult to achieve, especially across multi-disciplinary researchers, practitioners, and industries. The Sedentary Behavior Research Network (SBRN) undertook a Terminology Consensus Project to address this need. First, a literature review was completed to identify key terms in sedentary behavior research. These key terms were then reviewed and modified by a Steering Committee formed by SBRN. Next, SBRN members were invited to contribute to this project and interested participants reviewed and provided feedback on the proposed list of terms and draft definitions through an online survey. Finally, a conceptual model and consensus definitions (including caveats and examples for all age groups and functional abilities) were finalized based on the feedback received from the 87 SBRN member participants who responded to the original invitation and survey. Consensus definitions for the terms physical inactivity, stationary behavior, sedentary behavior, standing, screen time, non-screen-based sedentary time, sitting, reclining, lying, sedentary behavior pattern, as well as how the terms bouts, breaks, and interruptions should be used in this context are provided. It is hoped that the definitions resulting from this comprehensive, transparent, and broad-based participatory process will result in standardized terminology that is widely supported and adopted, thereby advancing future research, interventions, policies, and practices related to sedentary behaviors.
Technology Assessment Requirements for Programs and Projects
NASA Technical Reports Server (NTRS)
Bilbro, James W.
2006-01-01
Program/project uncertainty can most simply be defined as the unpredictability of its outcome. As might be expected, the degree of uncertainty depends substantially on program/project type. For hi-tech programs/projects, uncertainty all too frequently translates into schedule slips, cost overruns and occasionally even to cancellations or failures - consummations root cause of such events is often attributed to inadequate definition of requirements. If such were indeed the root cause, then correcting the situation would simply be a matter of requiring better requirements definition, but since history seems frequently to repeat itself, this must not be the case - at least not in total. There are in fact many contributors to schedule slips, cost overruns, project cancellations and failures, among them lack of adequate requirements definition. The case can be made, however, that many of these contributors are related to the degree of uncertainty at the outset of the project. And further, that a dominant factor in the degree of uncertainty is the maturity of the technology required to bring the project to fruition. This presentation discusses the concept of relating degrees of uncertainty to Technology Readiness Levels (TRL) and their associated Advancement Degree of Difficulty (AD2) levels. It also briefly describes a quantifiable process to establish the appropriate TRL for a given technology and quantifies through the AD2 what is required to move it from its current TRL to the desired TRL in order to reduce risk and maximize likelihood of successfully infusing the technology.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ball, J.B. Jr.
Direct oblique sagittal CT was used to evaluate trauma to 77 orbits. Sixty-seven orbital wall fractures with intact orbital rims (36 floor, 22 medial wall, nine roof) were identified in 47 orbits. Since persistent diplopia and/or enophthalmos may warrant surgical repair of orbital floor fractures, optimal imaging should include an evaluation of extraocular muscle status, the nature and amount of displaced orbital contents, and an accurate definition of fracture margins. For orbital floor fractures, a combination of the direct oblique sagittal and direct coronal projections optimally displayed all fracture margins, the fracture's relationship to the inferior orbital rim and medialmore » orbital wall, and the amount of displacement into the maxillary sinus. Inferior rectus muscle status with 36 floor fractures was best seen on the direct oblique sagittal projection in 30 fractures (83.3%) and was equally well seen on sagittal and coronal projections in two fractures (5.5%). Floor fractures were missed on 100% of axial, 5.5% of sagittal, and 0% of coronal projections. Since the direct oblique sagittal projection complements the direct coronal projection in evaluating orbital floor fractures, it should not be performed alone. A technical approach to the CT evaluation or orbital wall fractures is presented.« less
Simulation verification techniques study
NASA Technical Reports Server (NTRS)
Schoonmaker, P. B.; Wenglinski, T. H.
1975-01-01
Results are summarized of the simulation verification techniques study which consisted of two tasks: to develop techniques for simulator hardware checkout and to develop techniques for simulation performance verification (validation). The hardware verification task involved definition of simulation hardware (hardware units and integrated simulator configurations), survey of current hardware self-test techniques, and definition of hardware and software techniques for checkout of simulator subsystems. The performance verification task included definition of simulation performance parameters (and critical performance parameters), definition of methods for establishing standards of performance (sources of reference data or validation), and definition of methods for validating performance. Both major tasks included definition of verification software and assessment of verification data base impact. An annotated bibliography of all documents generated during this study is provided.
ERIC Educational Resources Information Center
Frisen, Ann; Holmqvist, Kristina; Oscarsson, Daniel
2008-01-01
This study formed the second wave of a longitudinal research project examining bullying from the students' perspective. A sample of 877 Swedish 13-year-olds filled out a questionnaire regarding the definition of bullying, reasons for why some students are bullied and the experience of adults' response to bullying. In their definitions, girls were…
Pre-Project Planning of Capital Facilities at NASA
1999-12-01
recognize the unfailing love and support of my extended family; Jim and Nancy Marasco , Dan and Monica Mustard, Jimmy and Jodi Marasco , Irene Brekelmans...completion Attachment B 116 Bibliography/References Dumont, Peter R. (1995). Project Definition Rating Index (PDRI) for Industrial Projects. Austin
Code of Federal Regulations, 2011 CFR
2011-04-01
... Section 12.3 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS General...) Authorized Commission representative means the Director of the Office of Energy Projects Licensing, the...
Code of Federal Regulations, 2012 CFR
2012-04-01
... Section 12.3 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS General...) Authorized Commission representative means the Director of the Office of Energy Projects Licensing, the...
Code of Federal Regulations, 2014 CFR
2014-04-01
... Section 12.3 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS General...) Authorized Commission representative means the Director of the Office of Energy Projects Licensing, the...
Code of Federal Regulations, 2013 CFR
2013-04-01
... Section 12.3 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS General...) Authorized Commission representative means the Director of the Office of Energy Projects Licensing, the...
Migrant Education Projects. Projectos de Educacion Migrante. Oregon Migrant Education.
ERIC Educational Resources Information Center
Oregon State Dept. of Education, Salem.
Written in both English and Spanish, this booklet briefly summarizes the general concepts and requirements behind Title I Migrant activities for use by project personnel, parents, and others interested in those projects. After a brief discussion of project funding and definitions of commonly used terms, there is an outline of requirements which…
A Proposed System of "Project Management" for Study Items.
ERIC Educational Resources Information Center
Worcester Public Schools, MA.
The purposes of the proposed system are to provide a standard operating procedure for a systematic and effective handling of project-type study items as differentiated from informational-type items; to assign definite singular responsibility for projects; to suggest specific sequential steps to be taken in the preparation of the project report;…
Project-Method Fit: Exploring Factors That Influence Agile Method Use
ERIC Educational Resources Information Center
Young, Diana K.
2013-01-01
While the productivity and quality implications of agile software development methods (SDMs) have been demonstrated, research concerning the project contexts where their use is most appropriate has yielded less definitive results. Most experts agree that agile SDMs are not suited for all project contexts. Several project and team factors have been…
Code of Federal Regulations, 2010 CFR
2010-01-01
... Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE... REGULATIONS (CONTINUED) ASSOCIATIONS Rural Business Enterprise Grants and Television Demonstration Grants § 1942.304 Definitions. Project. For rural business enterprise grants, the result of the use of program...
Code of Federal Regulations, 2011 CFR
2011-10-01
... SECURITY PREPAREDNESS NATIONAL EARTHQUAKE HAZARDS REDUCTION ASSISTANCE TO STATE AND LOCAL GOVERNMENTS Earthquake Hazards Reduction Assistance Program § 361.2 Definitions. Cash Contribution means the State cash... to States under this section. They include specific activities or projects related to earthquake...
Code of Federal Regulations, 2014 CFR
2014-10-01
... SECURITY PREPAREDNESS NATIONAL EARTHQUAKE HAZARDS REDUCTION ASSISTANCE TO STATE AND LOCAL GOVERNMENTS Earthquake Hazards Reduction Assistance Program § 361.2 Definitions. Cash Contribution means the State cash... to States under this section. They include specific activities or projects related to earthquake...
Code of Federal Regulations, 2013 CFR
2013-10-01
... SECURITY PREPAREDNESS NATIONAL EARTHQUAKE HAZARDS REDUCTION ASSISTANCE TO STATE AND LOCAL GOVERNMENTS Earthquake Hazards Reduction Assistance Program § 361.2 Definitions. Cash Contribution means the State cash... to States under this section. They include specific activities or projects related to earthquake...
Code of Federal Regulations, 2012 CFR
2012-10-01
... SECURITY PREPAREDNESS NATIONAL EARTHQUAKE HAZARDS REDUCTION ASSISTANCE TO STATE AND LOCAL GOVERNMENTS Earthquake Hazards Reduction Assistance Program § 361.2 Definitions. Cash Contribution means the State cash... to States under this section. They include specific activities or projects related to earthquake...
NASA Technical Reports Server (NTRS)
Darpel, Scott; Beckman, Sean
2016-01-01
Decades of systems engineering practice have demonstrated that the earlier the identification of requirements occurs, the lower the chance that costly redesigns will needed later in the project life cycle. A better understanding of all requirements can also improve the likelihood of a design's success. Significant effort has been put into developing tools and practices that facilitate requirements determination, including those that are part of the model-based systems engineering (MBSE) paradigm. These efforts have yielded improvements in requirements definition, but have thus far focused on a design's performance needs. The identification of safety & mission assurance (S&MA) related requirements, in comparison, can occur after preliminary designs are already established, yielding forced redesigns. Engaging S&MA expertise at an earlier stage, facilitated by the use of MBSE tools, and focused on actual project risk, can yield the same type of design life cycle improvements that have been realized in technical and performance requirements.
Artificial Gravity Research Project
NASA Technical Reports Server (NTRS)
Kamman, Michelle R.; Paloski, William H.
2005-01-01
Protecting the health, safety, and performance of exploration-class mission crews against the physiological deconditioning resulting from long-term weightlessness during transit and long-term hypogravity during surface operations will require effective, multi-system countermeasures. Artificial gravity (AG), which would replace terrestrial gravity with inertial forces generated by rotating the transit vehicle or by a human centrifuge device within the transit vehicle or surface habitat, has long been considered a potential solution. However, despite its attractiveness as an efficient, multi-system countermeasure and its potential for improving the environment and simplifying operational activities (e.g., WCS, galley, etc.), much still needs to be learned regarding the human response to rotating environments before AG can be successfully implemented. This paper will describe our approach for developing and implementing a rigorous AG Research Project to address the key biomedical research questions that must be answered before developing effective AG countermeasure implementation strategies for exploration-class missions. The AG Research Project will be performed at JSC, ARC, extramural academic and government research venues, and international partner facilities maintained by DLR and IMBP. The Project includes three major ground-based human research subprojects that will lead to flight testing of intermittent short-radius AG in ISS crewmembers after 201 0, continuous long-radius AG in CEV crews transiting to and from the Moon, and intermittent short-radius AG plus exercise in lunar habitats. These human ground-based subprojects include: 1) a directed, managed international short-radius project to investigate the multi-system effectiveness of intermittent AG in human subjects deconditioned by bed rest, 2) a directed, managed long-radius project to investigate the capacity of humans to live and work for extended periods in rotating environments, and 3) a focused, investigator-initiated project to investigate system-specific adaptation to and from rotating environments. The AG Research Project also includes two major animal research subprojects: 1) a directed, managed ground-based subproject using rodents and, possibly, sub-human primates, to address mechanistic issues that cannot be studied in humans, to rapidly develop higher sample numbers than can be achieved in the human subprojects, and to establish feasible parameter operating bands to reduce the breadth of the human subprojects, and 2) a flight subproject using rodents to estimate the physiological effects of long term exposure to hypogravity and to investigate the effects of contamination by terrestrial gravity in estimating AG effectiveness. The animal flight subproject would be performed aboard ISS using the CAM module in approximately the 2008-201 1 timeframe. The paper will first present an overview of the key biomedical research questions to be answered. It will then describe the overall approaches to be utilized in developing and implementing the AG Research Project, including definition of the intended scientific research, management and development approaches, identification of roles and responsibilities, risk management, and definition of project deliverables. The primary focus of the paper will be on the first of the three ground-based human research subprojects, since it is the only one currently in development and is scheduled to start active subject investigations in April of 2005.
EGNOS Tran Solutions for River Information Services
NASA Astrophysics Data System (ADS)
Jandrisits, Marko; de Mateo Garcia, Juan Carlos; Abwerzger, Gunther
2005-03-01
Within the ESA Advanced Research Telecommunications program ARTES-5, the project GALEWAT (Galileo and EGNOS for Waterway Transport) aims at introducing EGNOS into River Information Systems (RIS) through the Automatic Identification System (AIS).The GALEWAT project is carried out by a consortium composed by via donau (Austria), responsible for the overall project coordination and the operations in Vienna; Kongsberg Seatex AS (Norway), mainly responsible for the ship and shore equipment provision and installation; TeleConsult Austria (Austria), responsible for the geodetic reference system and performance evaluation of the tests, and INOV (Portugal), responsible for software development, i.e. performance monitor software and web interface for the external segment.During the definition phase, the system architecture and user equipment have been defined, in line with standards and international recommendations. The activity is currently in its implementation phase. Three demo sites are targeted: Vienna (Austria), Lisbon (Portugal) and Constanta (Romania) in order to illustrate the system in different environments (river navigation, harbour approach, open sea). The objective of this paper is to present the results of the tests and demo trials that took place based on the EGNOS signals during the last quarter of 2004 in Vienna.
Gao, Jinghong; Sun, Yunzong; Liu, Qiyong; Zhou, Maigeng; Lu, Yaogui; Li, Liping
2015-02-01
Few multi-city studies have been conducted to explore the regional level definition of heat wave and examine the association between extreme high temperature and mortality in developing countries. The purpose of the present study was to investigate the impact of extreme high temperature on mortality and to explore the local definition of heat wave in five Chinese cities. We first used a distributed lag non-linear model to characterize the effects of daily mean temperature on non-accidental mortality. We then employed a generalized additive model to explore the city-specific definition of heat wave. Finally, we performed a comparative analysis to evaluate the effectiveness of the definition. For each city, we found a positive non-linear association between extreme high temperature and mortality, with the highest effects appearing within 3 days of extreme heat event onset. Specifically, we defined individual heat waves of Beijing and Tianjin as being two or more consecutive days with daily mean temperatures exceeding 30.2 °C and 29.5 °C, respectively, and Nanjing, Shanghai and Changsha heat waves as ≥3 consecutive days with daily mean temperatures higher than 32.9 °C, 32.3 °C and 34.5 °C, respectively. Comparative analysis generally supported the definition. We found extreme high temperatures were associated with increased mortality, after a short lag period, when temperatures exceeded obvious threshold levels. The city-specific definition of heat wave developed in our study may provide guidance for the establishment and implementation of early heat-health response systems for local government to deal with the projected negative health outcomes due to heat waves. Copyright © 2014 Elsevier B.V. All rights reserved.
Dalbeth, Nicola; Schumacher, H Ralph; Fransen, Jaap; Neogi, Tuhina; Jansen, Tim L; Brown, Melanie; Louthrenoo, Worawit; Vazquez-Mellado, Janitzia; Eliseev, Maxim; McCarthy, Geraldine; Stamp, Lisa K; Perez-Ruiz, Fernando; Sivera, Francisca; Ea, Hang-Korng; Gerritsen, Martijn; Scire, Carlo A; Cavagna, Lorenzo; Lin, Chingtsai; Chou, Yin-Yi; Tausche, Anne-Kathrin; da Rocha Castelar-Pinheiro, Geraldo; Janssen, Matthijs; Chen, Jiunn-Horng; Cimmino, Marco A; Uhlig, Till; Taylor, William J
2016-12-01
To identify the best-performing survey definition of gout from items commonly available in epidemiologic studies. Survey definitions of gout were identified from 34 epidemiologic studies contributing to the Global Urate Genetics Consortium (GUGC) genome-wide association study. Data from the Study for Updated Gout Classification Criteria (SUGAR) were randomly divided into development and test data sets. A data-driven case definition was formed using logistic regression in the development data set. This definition, along with definitions used in GUGC studies and the 2015 American College of Rheumatology (ACR)/European League Against Rheumatism (EULAR) gout classification criteria were applied to the test data set, using monosodium urate crystal identification as the gold standard. For all tested GUGC definitions, the simple definition of "self-report of gout or urate-lowering therapy use" had the best test performance characteristics (sensitivity 82%, specificity 72%). The simple definition had similar performance to a SUGAR data-driven case definition with 5 weighted items: self-report, self-report of doctor diagnosis, colchicine use, urate-lowering therapy use, and hyperuricemia (sensitivity 87%, specificity 70%). Both of these definitions performed better than the 1977 American Rheumatism Association survey criteria (sensitivity 82%, specificity 67%). Of all tested definitions, the 2015 ACR/EULAR criteria had the best performance (sensitivity 92%, specificity 89%). A simple definition of "self-report of gout or urate-lowering therapy use" has the best test performance characteristics of existing definitions that use routinely available data. A more complex combination of features is more sensitive, but still lacks good specificity. If a more accurate case definition is required for a particular study, the 2015 ACR/EULAR gout classification criteria should be considered. © 2016, American College of Rheumatology.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Project means a project conducted by the Office of Personnel Management, or under its supervision, to... Federal personnel management (5 U.S.C. 4701). The project must require the waiver of a provision of law... Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH...
23 CFR 940.11 - Project implementation.
Code of Federal Regulations, 2011 CFR
2011-04-01
... projects funded with highway trust funds shall be based on a systems engineering analysis. (b) The analysis should be on a scale commensurate with the project scope. (c) The systems engineering analysis shall... definitions; (4) Analysis of alternative system configurations and technology options to meet requirements; (5...
23 CFR 940.11 - Project implementation.
Code of Federal Regulations, 2014 CFR
2014-04-01
... projects funded with highway trust funds shall be based on a systems engineering analysis. (b) The analysis should be on a scale commensurate with the project scope. (c) The systems engineering analysis shall... definitions; (4) Analysis of alternative system configurations and technology options to meet requirements; (5...
23 CFR 940.11 - Project implementation.
Code of Federal Regulations, 2012 CFR
2012-04-01
... projects funded with highway trust funds shall be based on a systems engineering analysis. (b) The analysis should be on a scale commensurate with the project scope. (c) The systems engineering analysis shall... definitions; (4) Analysis of alternative system configurations and technology options to meet requirements; (5...
23 CFR 940.11 - Project implementation.
Code of Federal Regulations, 2013 CFR
2013-04-01
... projects funded with highway trust funds shall be based on a systems engineering analysis. (b) The analysis should be on a scale commensurate with the project scope. (c) The systems engineering analysis shall... definitions; (4) Analysis of alternative system configurations and technology options to meet requirements; (5...
23 CFR 940.11 - Project implementation.
Code of Federal Regulations, 2010 CFR
2010-04-01
... projects funded with highway trust funds shall be based on a systems engineering analysis. (b) The analysis should be on a scale commensurate with the project scope. (c) The systems engineering analysis shall... definitions; (4) Analysis of alternative system configurations and technology options to meet requirements; (5...
Code of Federal Regulations, 2013 CFR
2013-01-01
..., into which a project is divided for budgeting and funding purposes. Continuation award means an award... project period or renewal thereof. Contract means a written procurement contract executed by a recipient... sharing or matching means that portion of project or programs costs not borne by the Federal Government...
Code of Federal Regulations, 2010 CFR
2010-01-01
... period for which project or measure benefits and costs have been evaluated. The evaluated life starts after the last project measure of the evaluation unit has been completed. Landuser. Those who... purpose and the replacement of portions of project measures as specified in the O&M agreement. Operation...
Francescutti, Carlo; Gongolo, Francesco; Simoncello, Andrea; Frattura, Lucilla
2011-05-31
There is a connection between the definition of disability in a person-environment framework, the development of appropriate assessment strategies and instruments, and the logic underpinning the organization of benefits and services to confront disability. The Italian Ministry of Health and Ministry of Labor and Social Policies supported a three-year project for the definition of a common framework and a standardised protocol for disability evaluation based on ICF. The research agenda of the project identified 6 phases: 1) adoption of a definition of disability; 2) analytical breakdown of the contents of disability definition, so as to indicate as clearly as possible the core information essential to guide the evaluation process; 3) definition of a data collection protocol; 4) national implementation of the protocol and collection of approximately 1,000 profiles; 5) proposal of a profile analysis and definition of groups of cases with similar functioning profiles; 6) trial of the proposal with the collected data. The data was analyzed in different ways: descriptive analysis, application of the person-environment interactions classification tree, and cluster analysis. A sample of 1,051 persons from 8 Italian regions was collected that represented different functioning conditions in all the phases of the life cycle. The aggregate result of the person-environment interactions was summarized. The majority of activities resulted with no problems in all of the A&P chapters. Nearly 50.000 facilitators codes were opened. The main frequent facilitators were family members, health and social professionals, assistive devices and both health and social systems, services and politics. The focus of the person-environment interaction evaluation was on the A&P domains, differentiating those in which performance presented limitations and restrictions from those in which performance had no or light limitations and restrictions. Communication(d3) and Learning and Applying Knowledge(d1) appeared as the more problematic A&P areas. Self Care(d5) was the domain in which facilitators were more effective in supporting functioning, suggesting that the Italian welfare system is mainly focused on providing care services for activities of daily living, jointly with the family. The cluster analysis was limited to those categories that were common to all age classes (38 categories out of 55). For a final representation, a solution with 6 clusters was chosen. An example is provided of how it is possible to plan empirical studies in which theoretical advances and operative goals on disability in a person-environment framework can support the definition of a research design, measurement strategies, and data analysis. The description of functioning and disability at population level is no more based on individual deficits or limitations. Personal profiles may be elaborated and groups created based on the characteristics of the person-environment interactions. Personal profiles may also be used as a "rationale" for defining personalized intervention programs.
A Practical Approach to Governance and Optimization of Structured Data Elements.
Collins, Sarah A; Gesner, Emily; Morgan, Steven; Mar, Perry; Maviglia, Saverio; Colburn, Doreen; Tierney, Diana; Rocha, Roberto
2015-01-01
Definition and configuration of clinical content in an enterprise-wide electronic health record (EHR) implementation is highly complex. Sharing of data definitions across applications within an EHR implementation project may be constrained by practical limitations, including time, tools, and expertise. However, maintaining rigor in an approach to data governance is important for sustainability and consistency. With this understanding, we have defined a practical approach for governance of structured data elements to optimize data definitions given limited resources. This approach includes a 10 step process: 1) identification of clinical topics, 2) creation of draft reference models for clinical topics, 3) scoring of downstream data needs for clinical topics, 4) prioritization of clinical topics, 5) validation of reference models for clinical topics, and 6) calculation of gap analyses of EHR compared against reference model, 7) communication of validated reference models across project members, 8) requested revisions to EHR based on gap analysis, 9) evaluation of usage of reference models across project, and 10) Monitoring for new evidence requiring revisions to reference model.
Code of Federal Regulations, 2012 CFR
2012-01-01
... financial analysis prepared by the Agency, based on the financial projections supplied by the applicant and... definition includes Variable Interest Entities as described in Financial Accounting Standards Board... required at the time the application was received by the Agency. Build-out means the construction...
Code of Federal Regulations, 2013 CFR
2013-01-01
... financial analysis prepared by the Agency, based on the financial projections supplied by the applicant and... definition includes Variable Interest Entities as described in Financial Accounting Standards Board... required at the time the application was received by the Agency. Build-out means the construction...
Code of Federal Regulations, 2014 CFR
2014-01-01
... financial analysis prepared by the Agency, based on the financial projections supplied by the applicant and... definition includes Variable Interest Entities as described in Financial Accounting Standards Board... required at the time the application was received by the Agency. Build-out means the construction...
Code of Federal Regulations, 2010 CFR
2010-10-01
...) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS § 80.1 Definitions. As used in this... administration and execution of the Wildlife and Sport Fish Restoration Acts. Project. One or more related...
34 CFR 491.5 - What definitions apply?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Nonprofit Private Project Public Secretary State educational agency (c) Other definitions. The following... literacy training mean adult education for homeless adults whose inability to speak, read, or write the... responsibilities. Eligible recipients means public or private agencies, institutions, or organizations, including...
34 CFR 491.5 - What definitions apply?
Code of Federal Regulations, 2011 CFR
2011-07-01
... Nonprofit Private Project Public Secretary State educational agency (c) Other definitions. The following... literacy training mean adult education for homeless adults whose inability to speak, read, or write the... responsibilities. Eligible recipients means public or private agencies, institutions, or organizations, including...
MSFC Sortie Laboratory Environmental Control System (ECS) phase B design study results
NASA Technical Reports Server (NTRS)
Ignatonis, A. J.; Mitchell, K. L.
1974-01-01
Phase B effort of the Sortie Lab program has concluded. Results of that effort are presented which pertain to the definitions of the environmental control system (ECS). Numerous design studies were performed in Phase B to investigate system feasibility, complexity, weight, and cost. The results and methods employed for these design studies are included. An autonomous Sortie Lab ECS was developed which utilizes a deployed space radiator. Total system weight was projected to be 1814.4 kg including the radiator and fluids. ECS power requirements were estimated at 950 watts.
Multidisciplinary Analysis and Optimization Generation 1 and Next Steps
NASA Technical Reports Server (NTRS)
Naiman, Cynthia Gutierrez
2008-01-01
The Multidisciplinary Analysis & Optimization Working Group (MDAO WG) of the Systems Analysis Design & Optimization (SAD&O) discipline in the Fundamental Aeronautics Program s Subsonic Fixed Wing (SFW) project completed three major milestones during Fiscal Year (FY)08: "Requirements Definition" Milestone (1/31/08); "GEN 1 Integrated Multi-disciplinary Toolset" (Annual Performance Goal) (6/30/08); and "Define Architecture & Interfaces for Next Generation Open Source MDAO Framework" Milestone (9/30/08). Details of all three milestones are explained including documentation available, potential partner collaborations, and next steps in FY09.
Experimental Test of Entropic Noise-Disturbance Uncertainty Relations for Spin-1/2 Measurements.
Sulyok, Georg; Sponar, Stephan; Demirel, Bülent; Buscemi, Francesco; Hall, Michael J W; Ozawa, Masanao; Hasegawa, Yuji
2015-07-17
Information-theoretic definitions for noise and disturbance in quantum measurements were given in [Phys. Rev. Lett. 112, 050401 (2014)] and a state-independent noise-disturbance uncertainty relation was obtained. Here, we derive a tight noise-disturbance uncertainty relation for complementary qubit observables and carry out an experimental test. Successive projective measurements on the neutron's spin-1/2 system, together with a correction procedure which reduces the disturbance, are performed. Our experimental results saturate the tight noise-disturbance uncertainty relation for qubits when an optimal correction procedure is applied.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The U.S. Trade and Development Program (TDP) organized a Definitional Mission (DM) to examine funding a feasibility study for an ammonia/urea complex in the Congo. Feedstock would be associated gas from crude oil separation facilities, possibility mixed with natural gas from wells that are presently capped. The Definitional Mission visited Congo. There it: Reviewed the project; Prepared terms of reference; Defined the scope of tasks to be carried out; Made an assessment of the rate of urea production; Estimated the installed cost of the overall facility; Prepared a preliminary economic analysis of the project; Estimated the cost of goods andmore » services which would be required; and Assessed the competitiveness of U.S. suppliers of goods and services for the project.« less
Develop Improved Materials to Support the Hydrogen Economy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dr. Michael C. Martin
The Edison Materials Technology Center (EMTEC) solicited and funded hydrogen infrastructure related projects that have a near term potential for commercialization. The subject technology of each project is related to the US Department of Energy hydrogen economy goals as outlined in the multi-year plan titled, 'Hydrogen, Fuel Cells and Infrastructure Technologies Program Multi-Year Research, Development and Demonstration Plan.' Preference was given to cross cutting materials development projects that might lead to the establishment of manufacturing capability and job creation. The Edison Materials Technology Center (EMTEC) used the US Department of Energy hydrogen economy goals to find and fund projects withmore » near term commercialization potential. An RFP process aligned with this plan required performance based objectives with go/no-go technology based milestones. Protocols established for this program consisted of a RFP solicitation process, white papers and proposals with peer technology and commercialization review (including DoE), EMTEC project negotiation and definition and DoE cost share approval. Our RFP approach specified proposals/projects for hydrogen production, hydrogen storage or hydrogen infrastructure processing which may include sensor, separator, compression, maintenance, or delivery technologies. EMTEC was especially alert for projects in the appropriate subject area that have cross cutting materials technology with near term manufacturing and commercialization opportunities.« less
Automated storage and retrieval of data obtained in the Interkosmos project
NASA Technical Reports Server (NTRS)
Ziolkovski, K.; Pakholski, V.
1975-01-01
The formation of a data bank and information retrieval system for scientific data is described. The stored data can be digital or documentation data. Data classification methods are discussed along with definition and compilation of the dictionary utilized, definition of the indexing scheme, and definition of the principles used in constructing a file for documents, data blocks, and tapes. Operating principles are also presented.
Next Generation Nuclear Plant Defense-in-Depth Approach
DOE Office of Scientific and Technical Information (OSTI.GOV)
Edward G. Wallace; Karl N. Fleming; Edward M. Burns
2009-12-01
The purpose of this paper is to (1) document the definition of defense-in-depth and the pproach that will be used to assure that its principles are satisfied for the NGNP project and (2) identify the specific questions proposed for preapplication discussions with the NRC. Defense-in-depth is a safety philosophy in which multiple lines of defense and conservative design and evaluation methods are applied to assure the safety of the public. The philosophy is also intended to deliver a design that is tolerant to uncertainties in knowledge of plant behavior, component reliability or operator performance that might compromise safety. This papermore » includes a review of the regulatory foundation for defense-in-depth, a definition of defense-in-depth that is appropriate for advanced reactor designs based on High Temperature Gas-cooled Reactor (HTGR) technology, and an explanation of how this safety philosophy is achieved in the NGNP.« less
77 FR 3840 - Proposed Collection; Comment Request for Regulation Project
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-25
...-1353. Regulation Project Number: FI-189-84. Abstract: These regulations provide definitions, reporting... issue discount and the imputation of, and accounting for, interest on certain sales or exchanges of...
7 CFR 4279.2 - Definitions and abbreviations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... projects utilizing technology that has a proven operating history, and for which there is an established... available energy projects that utilize technology that has a proven operating history, and for which there...
Report on a Knowledge-Based Software Assistant.
1983-08-01
maintainers, project managers , and end-users). In this paradigm, software activities, including definition, management , and validation will be...project management . This report also presents a plan for the development of the KBSA, along with a description of the necessary supporting technology...Activity Coordination .. .. .. ..... ...... ..... .... 19 3.2 Project Management and Documentation. .. ... ........ 20 3.2.1 Project Management Facet
Code of Federal Regulations, 2010 CFR
2010-10-01
... environmental impact statement which is required pursuant to §§ 268.3. Eligible project costs means the costs of preconstruction planning activities and the capital cost of the fixed guideway infrastructure of a Maglev project... storage, repair, and maintenance facilities, but eligible project costs do not include the cost of...
Code of Federal Regulations, 2013 CFR
2013-04-01
... Section 12.31 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS... water over the dam or a spillway. (e) The Director of the Office of Energy Projects Licensing may, for...
Code of Federal Regulations, 2014 CFR
2014-04-01
... Section 12.31 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS... water over the dam or a spillway. (e) The Director of the Office of Energy Projects Licensing may, for...
Code of Federal Regulations, 2012 CFR
2012-04-01
... Section 12.31 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS... water over the dam or a spillway. (e) The Director of the Office of Energy Projects Licensing may, for...
Code of Federal Regulations, 2011 CFR
2011-04-01
... Section 12.31 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS... water over the dam or a spillway. (e) The Director of the Office of Energy Projects Licensing may, for...
Early Restoration Projects Atlas | NOAA Gulf Spill Restoration
trustees are implementing. To view details of an individual project, click the View icon on the list below or click the project marker on the map. For definitions of the project detail click here. To highlight the location of a project from the list, click the Show on Map icon. This atlas will be updated as
Code of Federal Regulations, 2014 CFR
2014-10-01
... recent National Total Drug National Health Expenditure projections for the years involved). The growth... 42 Public Health 3 2014-10-01 2014-10-01 false Definitions. 423.902 Section 423.902 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICARE...
Code of Federal Regulations, 2013 CFR
2013-10-01
... recent National Total Drug National Health Expenditure projections for the years involved). The growth... 42 Public Health 3 2013-10-01 2013-10-01 false Definitions. 423.902 Section 423.902 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICARE...
Code of Federal Regulations, 2011 CFR
2011-10-01
... recent National Total Drug National Health Expenditure projections for the years involved). The growth... 42 Public Health 3 2011-10-01 2011-10-01 false Definitions. 423.902 Section 423.902 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICARE...
Code of Federal Regulations, 2012 CFR
2012-10-01
... recent National Total Drug National Health Expenditure projections for the years involved). The growth... 42 Public Health 3 2012-10-01 2012-10-01 false Definitions. 423.902 Section 423.902 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICARE...
Code of Federal Regulations, 2010 CFR
2010-10-01
... recent National Total Drug National Health Expenditure projections for the years involved). The growth... 42 Public Health 3 2010-10-01 2010-10-01 false Definitions. 423.902 Section 423.902 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICARE...
Code of Federal Regulations, 2010 CFR
2010-10-01
... (CLEO) means the highest level duly authorized law enforcement officer for a non-Department law enforcement agency. (f) Law Enforcement Officer means: (1) A duly authorized Federal law enforcement officer... LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION PROJECTS § 422.2 Definitions. (a) Department means...
Leveraging object-oriented development at Ames
NASA Technical Reports Server (NTRS)
Wenneson, Greg; Connell, John
1994-01-01
This paper presents lessons learned by the Software Engineering Process Group (SEPG) from results of supporting two projects at NASA Ames using an Object Oriented Rapid Prototyping (OORP) approach supported by a full featured visual development environment. Supplemental lessons learned from a large project in progress and a requirements definition are also incorporated. The paper demonstrates how productivity gains can be made by leveraging the developer with a rich development environment, correct and early requirements definition using rapid prototyping, and earlier and better effort estimation and software sizing through object-oriented methods and metrics. Although the individual elements of OO methods, RP approach and OO metrics had been used on other separate projects, the reported projects were the first integrated usage supported by a rich development environment. Overall the approach used was twice as productive (measured by hours per OO Unit) as a C++ development.
Phased Project Planning Guidelines
NASA Technical Reports Server (NTRS)
1968-01-01
NHB 7121.2 is the initial publication of the guidelines for implementation of the Phased Project Planning (PPP) concept prescribed by NPD 7121,1A. These guidelines are applicable to the planning and approval activities which lead to the implementation of major new research and development projects as defined in NPD 7121.1A as well as to major modifications or extensions of approved projects. They should, therefore, be reflected in the Project Approval Documents which serve as the basic documentation for project definition, guidance and control throughout NASA. The purpose of PPP is to provide, through defined phases, an adequate basis for management decisions on the extent to which project activities can be properly undertaken and commitments made. However, these guidelines do not prescribe detailed format and content of plans and other documents and reports used to apply the PPP concept. Similarly, the work content of phases and the information requirements described herein are not checklists. They are included to assist in understanding the intent of the PPP concept and should not be viewed as rigid or inflexible. PPP, as a concept for orderly planning and definition of new major R&D undertakings, must be adapted to the peculiarities of each individual case. However, the flexibility permitted for adaptation should not be considered as a license for major variation which would compromise the objectives that underlie the concept. Cognizant NASA officials are expected to pursue their project planning and definition activities in reasonable conformance with these guidelines and to request only those exceptions or deviations which are clearly necessary and justified. These guidelines will be modified as determined necessary on the basis of experience. Comments or suggestions for changes should be directed to the Office of Organization and Management.
Risk Classification and Risk-based Safety and Mission Assurance
NASA Technical Reports Server (NTRS)
Leitner, Jesse A.
2014-01-01
Recent activities to revamp and emphasize the need to streamline processes and activities for Class D missions across the agency have led to various interpretations of Class D, including the lumping of a variety of low-cost projects into Class D. Sometimes terms such as Class D minus are used. In this presentation, mission risk classifications will be traced to official requirements and definitions as a measure to ensure that projects and programs align with the guidance and requirements that are commensurate for their defined risk posture. As part of this, the full suite of risk classifications, formal and informal will be defined, followed by an introduction to the new GPR 8705.4 that is currently under review.GPR 8705.4 lays out guidance for the mission success activities performed at the Classes A-D for NPR 7120.5 projects as well as for projects not under NPR 7120.5. Furthermore, the trends in stepping from Class A into higher risk posture classifications will be discussed. The talk will conclude with a discussion about risk-based safety and mission assuranceat GSFC.
Digital Light Processing update: status and future applications
NASA Astrophysics Data System (ADS)
Hornbeck, Larry J.
1999-05-01
Digital Light Processing (DLP) projection displays based on the Digital Micromirror Device (DMD) were introduced to the market in 1996. Less than 3 years later, DLP-based projectors are found in such diverse applications as mobile, conference room, video wall, home theater, and large-venue. They provide high-quality, seamless, all-digital images that have exceptional stability as well as freedom from both flicker and image lag. Marked improvements have been made in the image quality of DLP-based projection display, including brightness, resolution, contrast ratio, and border image. DLP-based mobile projectors that weighted about 27 pounds in 1996 now weight only about 7 pounds. This weight reduction has been responsible for the definition of an entirely new projector class, the ultraportable. New applications are being developed for this important new projection display technology; these include digital photofinishing for high process speed minilab and maxilab applications and DLP Cinema for the digital delivery of films to audiences around the world. This paper describes the status of DLP-based projection display technology, including its manufacturing, performance improvements, and new applications, with emphasis on DLP Cinema.
The Systems Engineering Process for Human Support Technology Development
NASA Technical Reports Server (NTRS)
Jones, Harry
2005-01-01
Systems engineering is designing and optimizing systems. This paper reviews the systems engineering process and indicates how it can be applied in the development of advanced human support systems. Systems engineering develops the performance requirements, subsystem specifications, and detailed designs needed to construct a desired system. Systems design is difficult, requiring both art and science and balancing human and technical considerations. The essential systems engineering activity is trading off and compromising between competing objectives such as performance and cost, schedule and risk. Systems engineering is not a complete independent process. It usually supports a system development project. This review emphasizes the NASA project management process as described in NASA Procedural Requirement (NPR) 7120.5B. The process is a top down phased approach that includes the most fundamental activities of systems engineering - requirements definition, systems analysis, and design. NPR 7120.5B also requires projects to perform the engineering analyses needed to ensure that the system will operate correctly with regard to reliability, safety, risk, cost, and human factors. We review the system development project process, the standard systems engineering design methodology, and some of the specialized systems analysis techniques. We will discuss how they could apply to advanced human support systems development. The purpose of advanced systems development is not directly to supply human space flight hardware, but rather to provide superior candidate systems that will be selected for implementation by future missions. The most direct application of systems engineering is in guiding the development of prototype and flight experiment hardware. However, anticipatory systems engineering of possible future flight systems would be useful in identifying the most promising development projects.
Flynn-O’Brien, Katherine T.; Trelles, Miguel; Dominguez, Lynette; Hassani, Ghulam Hiadar; Akemani, Clemence; Naseer, Aamer; Ntawukiruwabo, Innocent Bagura; Kushner, Adam L.; Rothstein, David H.; Stewart, Barclay T.
2018-01-01
Purpose Pediatric surgical care is deficient in developing countries disrupted by crisis. We aimed to describe pediatric surgical care at Médecins Sans Frontières-Brussels (MSF-OCB) projects to inform resource allocation and define the pediatric-specific skillset necessary for humanitarian surgical teams. Methods Procedures performed by MSF-OCB from July 2008 to December 2014 were reviewed. Project characteristics, patient demographics and clinical data were described. Multivariable logistic regression was performed to determine predictors of perioperative death. Results Of 109,828 procedures, 26,284 were performed for 24,576 children (22% of all procedures). The most common pediatric operative indication was trauma (13,984; 57%). Nine percent of all surgical indications were due to violence (e.g., land mines, firearms, gender-based violence, etc.). The majority of procedures (19,582; 75%) were general surgical, followed by orthopedic (4350; 17%), and obstetric/gynecologic/urologic (2135; 8%). Perioperative death was low (42; 0.17%); independent predictors of death included age <1 year, use of general anesthesia with a definitive airway, and operation during conflict. Conclusion Surgical care for children comprised nearly a quarter of all procedures performed by MSF-OCB between 2008 and 2014. Attention to trauma surgery and infant perioperative care is particularly needed. These findings are important when resourcing projects and training surgical staff for humanitarian missions. PMID:26454469
Flynn-O'Brien, Katherine T; Trelles, Miguel; Dominguez, Lynette; Hassani, Ghulam Hiadar; Akemani, Clemence; Naseer, Aamer; Ntawukiruwabo, Innocent Bagura; Kushner, Adam L; Rothstein, David H; Stewart, Barclay T
2016-04-01
Pediatric surgical care is deficient in developing countries disrupted by crisis. We aimed to describe pediatric surgical care at Médecins Sans Frontières-Brussels (MSF-OCB) projects to inform resource allocation and define the pediatric-specific skillset necessary for humanitarian surgical teams. Procedures performed by MSF-OCB from July 2008 to December 2014 were reviewed. Project characteristics, patient demographics and clinical data were described. Multivariable logistic regression was performed to determine predictors of perioperative death. Of 109,828 procedures, 26,284 were performed for 24,576 children (22% of all procedures). The most common pediatric operative indication was trauma (13,984; 57%). Nine percent of all surgical indications were due to violence (e.g., land mines, firearms, gender-based violence, etc.). The majority of procedures (19,582; 75%) were general surgical, followed by orthopedic (4350; 17%), and obstetric/gynecologic/urologic (2135; 8%). Perioperative death was low (42; 0.17%); independent predictors of death included age <1year, use of general anesthesia with a definitive airway, and operation during conflict. Surgical care for children comprised nearly a quarter of all procedures performed by MSF-OCB between 2008 and 2014. Attention to trauma surgery and infant perioperative care is particularly needed. These findings are important when resourcing projects and training surgical staff for humanitarian missions. Copyright © 2016 Elsevier Inc. All rights reserved.
Optimizing Value and Avoiding Problems in Building Schools.
ERIC Educational Resources Information Center
Brevard County School Board, Cocoa, FL.
This report describes school design and construction delivery processes used by the School Board of Brevard County (Cocoa, Florida) that help optimize value, avoid problems, and eliminate the cost of maintaining a large facility staff. The project phases are examined from project definition through design to construction. Project delivery…
Code of Federal Regulations, 2014 CFR
2014-01-01
... “energy project” means projects related to the siting, construction, expansion, or operation of any... authorization for the permitting, approval or other authorization of an energy project. (e) The term “lead... financial assistance under subparts F or I of this part for an energy project. [65 FR 77154, Dec. 8, 2000...
Code of Federal Regulations, 2011 CFR
2011-01-01
... “energy project” means projects related to the siting, construction, expansion, or operation of any... authorization for the permitting, approval or other authorization of an energy project. (e) The term “lead... financial assistance under subparts F or I of this part for an energy project. [65 FR 77154, Dec. 8, 2000...
Code of Federal Regulations, 2012 CFR
2012-07-01
...) Requester. A developer of a renewable energy development or other energy project or a state or local...) Mitigation. Actions taken by either or both the DoD or the applicant to ensure that a project does not create an unacceptable risk to the national security of the United States. (i) Proposed project. A proposed...
Code of Federal Regulations, 2013 CFR
2013-07-01
...) Requester. A developer of a renewable energy development or other energy project or a state or local...) Mitigation. Actions taken by either or both the DoD or the applicant to ensure that a project does not create an unacceptable risk to the national security of the United States. (i) Proposed project. A proposed...
Code of Federal Regulations, 2013 CFR
2013-01-01
... “energy project” means projects related to the siting, construction, expansion, or operation of any... authorization for the permitting, approval or other authorization of an energy project. (e) The term “lead... financial assistance under subparts F or I of this part for an energy project. [65 FR 77154, Dec. 8, 2000...
Code of Federal Regulations, 2012 CFR
2012-01-01
... “energy project” means projects related to the siting, construction, expansion, or operation of any... authorization for the permitting, approval or other authorization of an energy project. (e) The term “lead... financial assistance under subparts F or I of this part for an energy project. [65 FR 77154, Dec. 8, 2000...
The Columbia Classroom Environments Project...Fourth Progress Report, December 1971.
ERIC Educational Resources Information Center
Grannis, Joseph C.
The Columbia Classroom Environments Project (CCEP) report discusses a number of questions about a set of dimensions of learning and development as well as the instruments the project was developing for the analysis of behavior in learning environments. Joseph C. Grannis examines The Argument, Assumptions, Definitions, Hypothesis; Rochelle Mayer…
A Dust Aggregation and Concentration System (DACS) for the Microgravity Space Environment
NASA Technical Reports Server (NTRS)
Giovane, F. J.; Blum, J.
1999-01-01
The Dust Aggregation and Concentration System, DACS, Project is an international effort intended to complete the preliminary definition of a system for suspending and concentrating dust particles in a microgravity environment for extended periods of time. The DACS design concept is based on extensive ground, drop tower, and parabolic flight tests. During the present proposed work, the DACS design will be completed, and a Science Requirements Document generated. At the end of the proposed 2 year project, DACS will be positioned to enter the advanced definition phase.
Johansen, Kirsten L; Dalrymple, Lorien S; Delgado, Cynthia; Kaysen, George A; Kornak, John; Grimes, Barbara; Chertow, Glenn M
2014-10-01
A well-accepted definition of frailty includes measurements of physical performance, which may limit its clinical utility. In a cross-sectional study, we compared prevalence and patient characteristics based on a frailty definition that uses self-reported function to the classic performance-based definition and developed a modified self-report-based definition. Prevalent adult patients receiving hemodialysis in 14 centers around San Francisco and Atlanta in 2009-2011. Self-report-based frailty definition in which a score lower than 75 on the Physical Function scale of the 36-Item Short Form Health Survey (SF-36) was substituted for gait speed and grip strength in the classic definition; modified self-report definition with optimized Physical Function score cutoff points derived in a development (one-half) cohort and validated in the other half. Performance-based frailty defined as 3 of the following: weight loss, weakness, exhaustion, low physical activity, and slow gait speed. 387 (53%) patients were frail based on self-reported function, of whom 209 (29% of the cohort) met the performance-based definition. Only 23 (3%) met the performance-based definition of frailty only. The self-report definition had 90% sensitivity, 64% specificity, 54% positive predictive value, 93% negative predictive value, and 72.5% overall accuracy. Intracellular water per kilogram of body weight and serum albumin, prealbumin, and creatinine levels were highest among nonfrail individuals, intermediate among those who were frail by self-report, and lowest among those who also were frail by performance. Age, percentage of body fat, and C-reactive protein level followed an opposite pattern. The modified self-report definition had better accuracy (84%; 95% CI, 79%-89%) and superior specificity (88%) and positive predictive value (67%). Our study did not address prediction of outcomes. Patients who meet the self-report-based but not the performance-based definition of frailty may represent an intermediate phenotype. A modified self-report definition can improve the accuracy of a questionnaire-based method of defining frailty. Published by Elsevier Inc.
44 CFR 206.201 - Definitions used in this subpart.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Definitions used in this subpart. 206.201 Section 206.201 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY DISASTER ASSISTANCE FEDERAL DISASTER ASSISTANCE Public Assistance Project...
Code of Federal Regulations, 2011 CFR
2011-04-01
... DESIGNATED HOUSING-PUBLIC HOUSING DESIGNATED FOR OCCUPANCY BY DISABLED, ELDERLY, OR DISABLED AND ELDERLY FAMILIES General § 945.105 Definitions. The terms Department, Elderly person, HUD, NAHA, Public Housing.... Designated family means the category of family for whom the project is designated (e. g., elderly family in a...
Code of Federal Regulations, 2012 CFR
2012-04-01
... applicable to this part. As used in this part: Pavement design means a project level activity where detailed... 23 Highways 1 2012-04-01 2012-04-01 false Definitions. 626.2 Section 626.2 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS PAVEMENT POLICY...
Code of Federal Regulations, 2013 CFR
2013-04-01
... applicable to this part. As used in this part: Pavement design means a project level activity where detailed... 23 Highways 1 2013-04-01 2013-04-01 false Definitions. 626.2 Section 626.2 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS PAVEMENT POLICY...
Code of Federal Regulations, 2010 CFR
2010-04-01
... applicable to this part. As used in this part: Pavement design means a project level activity where detailed... 23 Highways 1 2010-04-01 2010-04-01 false Definitions. 626.2 Section 626.2 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS PAVEMENT POLICY...
Code of Federal Regulations, 2014 CFR
2014-04-01
... applicable to this part. As used in this part: Pavement design means a project level activity where detailed... 23 Highways 1 2014-04-01 2014-04-01 false Definitions. 626.2 Section 626.2 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS PAVEMENT POLICY...
Code of Federal Regulations, 2011 CFR
2011-04-01
... applicable to this part. As used in this part: Pavement design means a project level activity where detailed... 23 Highways 1 2011-04-01 2011-04-01 false Definitions. 626.2 Section 626.2 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS PAVEMENT POLICY...
34 CFR 380.9 - What definitions apply?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 2 2010-07-01 2010-07-01 false What definitions apply? 380.9 Section 380.9 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION SPECIAL PROJECTS AND DEMONSTRATIONS FOR PROVIDING SUPPORTED...
78 FR 23975 - Proposed Collection; Comment Request for Regulation Project
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-23
... definition of a controlled foreign corporation, foreign base company income and foreign personal holding company income of a controlled foreign corporation. DATES: Written comments should be received on or... INFORMATION: Title: Definition of a Controlled Foreign Corporation, Foreign Base Company Income and Foreign...
Code of Federal Regulations, 2012 CFR
2012-07-01
..., GRANTS, OR COOPERATIVE AGREEMENTS FOR PROTOTYPE PROJECTS § 3.4 Definitions. Agency point of contact (POC... by non-Federal parties pursuant to statute or require submittal of financial or cost records/reports... the Air Force—Assistant Secretary of the Air Force (Acquisition). (4) The Directors of Defense...
Code of Federal Regulations, 2014 CFR
2014-07-01
..., GRANTS, OR COOPERATIVE AGREEMENTS FOR PROTOTYPE PROJECTS § 3.4 Definitions. Agency point of contact (POC... by non-Federal parties pursuant to statute or require submittal of financial or cost records/reports... the Air Force—Assistant Secretary of the Air Force (Acquisition). (4) The Directors of Defense...
Code of Federal Regulations, 2011 CFR
2011-07-01
..., GRANTS, OR COOPERATIVE AGREEMENTS FOR PROTOTYPE PROJECTS § 3.4 Definitions. Agency point of contact (POC... by non-Federal parties pursuant to statute or require submittal of financial or cost records/reports... the Air Force—Assistant Secretary of the Air Force (Acquisition). (4) The Directors of Defense...
Code of Federal Regulations, 2013 CFR
2013-07-01
..., GRANTS, OR COOPERATIVE AGREEMENTS FOR PROTOTYPE PROJECTS § 3.4 Definitions. Agency point of contact (POC... by non-Federal parties pursuant to statute or require submittal of financial or cost records/reports... the Air Force—Assistant Secretary of the Air Force (Acquisition). (4) The Directors of Defense...
On the Definition of Public Relations: A European View.
ERIC Educational Resources Information Center
Vercic, Dejan; van Ruler, Betteke; Butschi, Gerhard; Flodin, Bertil
2001-01-01
Introduces the project on the European Public Relations Body of Knowledge (EBOK). Reviews proposals on the definition, dimensions, and domain of public relations. Confronts these with findings from EBOK. Presents ideas on how to bridge the differences. Proposes ideas for further investigation. (SG)
Shirao, Satoshi; Yoneda, Hiroshi; Ishihara, Hideyuki; Kajiwara, Koji; Suzuki, Michiyasu
2011-01-01
Background: There is a lack of unified information on diagnosis and treatment of cerebral vasospasm (CV) after subarachnoid hemorrhage (SAH) among the hospitals in Japan. Thus, the aim of the study was to define the current practice in this area based on a survey by Japanese neurosurgeons. Methods: A survey on diagnosis and treatment of CV was sent to 414 hospitals each of which performs >100 neurosurgeries annually. Results: Responses were received from 240 hospitals (58.0%). Because accurate criteria for diagnosis of symptomatic vasospasm (SVS) were used in only 33.8% of the hospitals, we proposed a clinical definition of SVS that was approved at the 25th Spasm Symposium (Consensus 2009). This definition is simplified as follows: (1) the presence of neurological worsening; (2) no other identifiable cause of neurological worsening; and (3) confirmation of vasospasm by medical examinations. The results also showed that the Fisher CT scale is used differently for patients with ICH or IVH, with 41.3% of cases with ICH/IVH based on SAH that met Fisher criteria classified into Fisher group 1, 2 or 3, and 46.3% classified into Fisher group 4. There were no major differences in prophylactic therapies of CV and therapy for cerebral ischemia among the hospitals. Endovascular treatment for vasospasm was performed in most hospitals (78.7%); however, the criteria differed among the hospitals: (1) angiographic vasospasm and SVS appeared (37.9%), (2) only when aggressive therapy was ineffective (41.4%). Conclusion: We established a clinical definition of SVS based on the results of this survey (Consensus 2009). PMID:21748027
NASA Astrophysics Data System (ADS)
Davoudi, Alireza; Shiry Ghidary, Saeed; Sadatnejad, Khadijeh
2017-06-01
Objective. In this paper, we propose a nonlinear dimensionality reduction algorithm for the manifold of symmetric positive definite (SPD) matrices that considers the geometry of SPD matrices and provides a low-dimensional representation of the manifold with high class discrimination in a supervised or unsupervised manner. Approach. The proposed algorithm tries to preserve the local structure of the data by preserving distances to local means (DPLM) and also provides an implicit projection matrix. DPLM is linear in terms of the number of training samples. Main results. We performed several experiments on the multi-class dataset IIa from BCI competition IV and two other datasets from BCI competition III including datasets IIIa and IVa. The results show that our approach as dimensionality reduction technique—leads to superior results in comparison with other competitors in the related literature because of its robustness against outliers and the way it preserves the local geometry of the data. Significance. The experiments confirm that the combination of DPLM with filter geodesic minimum distance to mean as the classifier leads to superior performance compared with the state of the art on brain-computer interface competition IV dataset IIa. Also the statistical analysis shows that our dimensionality reduction method performs significantly better than its competitors.
Extending the Boundaries of the Imagination.
ERIC Educational Resources Information Center
Carlson, Judy B.
1979-01-01
This article describes a seventh-grade physical education class project that called for definitions of 21 terms such as human movement, dance, rhythm, time, space, etc. Individual projects included booklets, movies, photomontages, scrapbooks, and posters. (JMF)
HEAVY AND THERMAL OIL RECOVERY PRODUCTION MECHANISMS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anthony R. Kovscek
2003-04-01
This technical progress report describes work performed from January 1 through March 31, 2003 for the project ''Heavy and Thermal Oil Recovery Production Mechanisms,'' DE-FC26-00BC15311. In this project, a broad spectrum of research is undertaken related to thermal and heavy-oil recovery. The research tools and techniques span from pore-level imaging of multiphase fluid flow to definition of reservoir-scale features through streamline-based history matching techniques. During this period, previous analysis of experimental data regarding multidimensional imbibition to obtain shape factors appropriate for dual-porosity simulation was verified by comparison among analytic, dual-porosity simulation, and fine-grid simulation. We continued to study the mechanismsmore » by which oil is produced from fractured porous media at high pressure and high temperature. Temperature has a beneficial effect on recovery and reduces residual oil saturation. A new experiment was conducted on diatomite core. Significantly, we show that elevated temperature induces fines release in sandstone cores and this behavior may be linked to wettability. Our work in the area of primary production of heavy oil continues with field cores and crude oil. On the topic of reservoir definition, work continued on developing techniques that integrate production history into reservoir models using streamline-based properties.« less
“Applied” Aspects of the Drug Resistance Strategies Project
Hecht, Michael L.; Miller-Day, Michelle A.
2010-01-01
This paper discusses the applied aspects of our Drug Resistance Strategies Project. We argue that a new definitional distinction is needed to expand the notion of “applied” from the traditional notion of utilizing theory, which we call “applied.1”, in order to consider theory-grounded, theory testing and theory developing applied research. We label this new definition “applied.2” research. We then explain that our descriptive work describing the social processes of adolescent substance use, identity and use, and drug norms, as well as the subsequent development and dissemination of our keepin’ it REAL middle school substance use curriculum are examples of “applied.1” work. In the “applied.2” realm, we include our theory testing (e.g., tests of multiculturalism, narrative and performance theories, the Focus Theory of Norms) and theory-developing (e.g., parent-child communication, cultural grounding) research as well our new directions in theory development (e.g., adaptation processes). We conclude with a call for space in the discipline for “applied.2” work that builds and tests theory through application to significant social issues that contribute to our communities. We note obstacles in departmental and scholarly norms but express optimism about the prospects for “applied.2” research in the future of communication research. PMID:20711485
12om Methodology: Process v1.1
2014-03-31
in support of the Applied Research Project (ARP) 12om entitled “Collaborative Understanding of Complex Situations”. The overall purpose of this...Definition ARP Applied Research Project CF Canadian Forces CFOPP Canadian Forces Operational Planning Process CIDA Canadian International... Research Project (ARP) 12om entitled “Collaborative Understanding of Complex Situations”. The overall purpose of this project is to develop a
Comparison of microstickies measurement methods. Part I, sample preparation and measurement methods
Mahendra R. Doshi; Angeles Blanco; Carlos Negro; Gilles M. Dorris; Carlos C. Castro; Axel Hamann; R. Daniel Haynes; Carl Houtman; Karen Scallon; Hans-Joachim Putz; Hans Johansson; R.A. Venditti; K. Copeland; H.-M. Chang
2003-01-01
Recently, we completed a project on the comparison of macrostickies measurement methods. Based on the success of the project, we decided to embark on this new project on comparison of microstickies measurement methods. When we started this project, there were some concerns and doubts principally due to the lack of an accepted definition of microstickies. However, we...
Boeker, Martin; Stenzhorn, Holger; Kumpf, Kai; Bijlenga, Philippe; Schulz, Stefan; Hanser, Susanne
2007-01-01
The @neurIST ontology is currently under development within the scope of the European project @neurIST intended to serve as a module in a complex architecture aiming at providing a better understanding and management of intracranial aneurysms and subarachnoid hemorrhages. Due to the integrative structure of the project the ontology needs to represent entities from various disciplines on a large spatial and temporal scale. Initial term acquisition was performed by exploiting a database scaffold, literature analysis and communications with domain experts. The ontology design is based on the DOLCE upper ontology and other existing domain ontologies were linked or partly included whenever appropriate (e.g., the FMA for anatomical entities and the UMLS for definitions and lexical information). About 2300 predominantly medical entities were represented but also a multitude of biomolecular, epidemiological, and hemodynamic entities. The usage of the ontology in the project comprises terminological control, text mining, annotation, and data mediation. PMID:18693797
Verzola, Adriano; Bentivegna, Roberto; Carandina, Gianni; Trevisani, Lucio; Gregorio, Pasquale; Mandini, Alberto
2009-09-08
One of the best-known performance planning and evaluation techniques utilising both monetary and non-monetary data is the Balanced Scorecard (BSC). This is a means of rationalising the global activity of a business in the attempt to create value, and to translate the company vision into a set of tactical objectives and measurable strategies. The aim of this study was to implement and evaluate the use of BSC in two departments of the St. Anna University Hospital, Ferrara: the Analysis Laboratory and Digestive Endoscopy operating units (OU). With the collaboration of the health workers involved, a precise methodological programme was pursued: Definition of the strategic map from 4 perspectives, according to Kaplan and Norton, Definition of the Key Performance Areas (KPA), or macro-objectives, Identification of the cause-effect relationships between KPAs, Identification of the sub-objectives of each KPA, Definition of the Key Performance Indicators (KPI), Definition of the weight/importance of each objective in the global evaluation. The information gathered permitted the definition of macro- and sub-objectives for each perspective, as well as determining the relevant indicators, standards, weights, frequency of detection and means of acquisition. Strategic maps showing the cause/effect relationships in each OU were created, as were 'evaluation panels', which describe the global performance of each department. For each perspective, the fundamental data were summarised in one table. Evaluation of each perspective yielded a positive result for the majority of the objectives, and the global result (including all 4 perspectives) was found to be satisfactory. The Balanced Scorecard was implemented in the abovementioned OUs of St. Anna University Hospital, Ferrara, after the health workers themselves realised the need for change.In our research the employees were pleased to be evaluated, not only for the financial outcomes, but also for the satisfaction of improving internal procedure, relationships with the community and their own growth/learning. BSC is an ideal point of contact between the financial and clinical dimensions of management. However, difficulties in its application were faced, among these, at least in the initial phase, the lack of information systems able to drive it, and the complexity of the research for specific indicators needed to be overcome. The time factor (on average, at least two years are required) and the availability of technological resources were also limiting factors.The rapid diffusion of BSC among the principal international profit and non-profit organisations is testament to its great potential. This project could be seen as a preparatory phase in the strategical analysis of a subsequent business plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false Consortium. 603.1235 Section 603.1235 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Definitions of Terms Used in... incorporated or that otherwise agrees to jointly carry out a RD&D project (see definition of “articles of...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 4 2011-01-01 2011-01-01 false Consortium. 603.1235 Section 603.1235 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Definitions of Terms Used in... incorporated or that otherwise agrees to jointly carry out a RD&D project (see definition of “articles of...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 297.3 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE WILD AND SCENIC RIVERS Water Resources Projects § 297.3 Definitions. Act means the Wild and Scenic Rivers Act (82 Stat... assistance affecting the free-flowing characteristics or the scenic or natural values of a Wild and Scenic...
Organizational Change Processes: A Bibliography With Commentary.
ERIC Educational Resources Information Center
Baldridge, J. Victor
This bibliography deals with a wide variety of organizational dynamics and is related to the definition of organizational change developed by the Stanford Center's Organizational Change project. This definition, discussed in detail, focuses on deliberate change instituted to reformulate official policy. A topical outline of the bibliography is…
Code of Federal Regulations, 2013 CFR
2013-07-01
... 297.3 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE WILD AND SCENIC RIVERS Water Resources Projects § 297.3 Definitions. Act means the Wild and Scenic Rivers Act (82 Stat... assistance affecting the free-flowing characteristics or the scenic or natural values of a Wild and Scenic...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 297.3 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE WILD AND SCENIC RIVERS Water Resources Projects § 297.3 Definitions. Act means the Wild and Scenic Rivers Act (82 Stat... assistance affecting the free-flowing characteristics or the scenic or natural values of a Wild and Scenic...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 297.3 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE WILD AND SCENIC RIVERS Water Resources Projects § 297.3 Definitions. Act means the Wild and Scenic Rivers Act (82 Stat... assistance affecting the free-flowing characteristics or the scenic or natural values of a Wild and Scenic...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 297.3 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE WILD AND SCENIC RIVERS Water Resources Projects § 297.3 Definitions. Act means the Wild and Scenic Rivers Act (82 Stat... assistance affecting the free-flowing characteristics or the scenic or natural values of a Wild and Scenic...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Definitions. 211.72 Section 211.72 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE REAL ESTATE ACTIVITIES OF THE CORPS OF ENGINEERS IN CONNECTION WITH CIVIL WORKS PROJECTS Sale of Lands...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-25
... observational findings, and creating other sources of research-based information. This research stage may... definitions for the Disability and Rehabilitation Research Projects and Centers Program administered by the National Institute on Disability and Rehabilitation Research (NIDRR). Specifically, this document proposes...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-07
... and refined analyses of data, producing observational findings, and creating other sources of research... Services announces priorities and definitions for the Disability and Rehabilitation Research Projects and Centers Program administered by the National Institute on Disability and Rehabilitation Research (NIDRR...
75 FR 13207 - Proposed Collection; Comment Request for Regulation Project
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-18
... comments concerning an existing final regulation, INTL-362-88 (TD 8618), Definition of a Controlled Foreign..., 2010 to be assured of consideration. ADDRESSES: Direct all written comments to R. Joseph Durbala... INFORMATION: Title: Definition of a Controlled Foreign Corporation, Foreign Base Company Income and Foreign...
34 CFR 425.5 - What definitions apply?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 3 2010-07-01 2010-07-01 false What definitions apply? 425.5 Section 425.5 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION DEMONSTRATION PROJECTS FOR THE INTEGRATION OF VOCATIONAL AND ACADEMIC LEARNING...
34 CFR 376.4 - What definitions apply to this program?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 34 Education 2 2012-07-01 2012-07-01 false What definitions apply to this program? 376.4 Section... project support. (2) Transitional rehabilitation services means any vocational rehabilitation services... advanced learning technology for skills training; and (iv) Follow-up services for individuals placed in...
34 CFR 376.4 - What definitions apply to this program?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 34 Education 2 2014-07-01 2013-07-01 true What definitions apply to this program? 376.4 Section... project support. (2) Transitional rehabilitation services means any vocational rehabilitation services... advanced learning technology for skills training; and (iv) Follow-up services for individuals placed in...
34 CFR 376.4 - What definitions apply to this program?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 34 Education 2 2013-07-01 2013-07-01 false What definitions apply to this program? 376.4 Section... project support. (2) Transitional rehabilitation services means any vocational rehabilitation services... advanced learning technology for skills training; and (iv) Follow-up services for individuals placed in...
Code of Federal Regulations, 2011 CFR
2011-01-01
... experience in particular scientific or technical fields to give expert advice, in accordance with the... RESEARCH GRANTS PROGRAM General § 3401.2 Definitions. As used in this part: (a) Administrator means the... awarded under this part. (e) Research project grant means the award by the Administrator of funds to a...
Code of Federal Regulations, 2010 CFR
2010-10-01
... areas under review, to give expert advice on the scientific and technical merit of grant applications or... PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS SCIENTIFIC PEER REVIEW OF RESEARCH GRANT APPLICATIONS AND RESEARCH AND DEVELOPMENT CONTRACT PROJECTS § 52h.2 Definitions. As used in this...
Code of Federal Regulations, 2011 CFR
2011-10-01
... areas under review, to give expert advice on the scientific and technical merit of grant applications or... PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS SCIENTIFIC PEER REVIEW OF RESEARCH GRANT APPLICATIONS AND RESEARCH AND DEVELOPMENT CONTRACT PROJECTS § 52h.2 Definitions. As used in this...
34 CFR 425.5 - What definitions apply?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 34 Education 3 2014-07-01 2014-07-01 false What definitions apply? 425.5 Section 425.5 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION DEMONSTRATION PROJECTS FOR THE INTEGRATION OF VOCATIONAL AND ACADEMIC LEARNING...
34 CFR 425.5 - What definitions apply?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 34 Education 3 2013-07-01 2013-07-01 false What definitions apply? 425.5 Section 425.5 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION DEMONSTRATION PROJECTS FOR THE INTEGRATION OF VOCATIONAL AND ACADEMIC LEARNING...
Code of Federal Regulations, 2010 CFR
2010-07-01
....2 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR RIGHTS-OF-WAY Rights-of-Way: General § 14.2 Definitions. (a) Secretary means the Secretary of the Interior. (b... representative. (e) Project means the physical structures in connection with which the right-of-way is approved...
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF TRANSPORTATION HAZARDOUS MATERIALS AND OIL TRANSPORTATION HAZARDOUS MATERIALS PUBLIC SECTOR... review means the review and evaluation of costs to determine reasonableness, allocability, and... the program contact with the project manager. The project officer is responsible for monitoring the...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF TRANSPORTATION HAZARDOUS MATERIALS AND OIL TRANSPORTATION HAZARDOUS MATERIALS PUBLIC SECTOR... review means the review and evaluation of costs to determine reasonableness, allocability, and... the program contact with the project manager. The project officer is responsible for monitoring the...
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF TRANSPORTATION HAZARDOUS MATERIALS AND OIL TRANSPORTATION HAZARDOUS MATERIALS PUBLIC SECTOR... review means the review and evaluation of costs to determine reasonableness, allocability, and... the program contact with the project manager. The project officer is responsible for monitoring the...
Leveraging Resources to Address Transportation Needs: Transportation Pooled Fund Program
DOT National Transportation Integrated Search
2004-05-28
This brochure describes the Transportation Pooled Fund (TPF) Program. The objectives of the TPF Program are to leverage resources, avoid duplication of effort, undertake large-scale projects, obtain greater input on project definition, achieve broade...
48 CFR 52.222-33 - Notice of Requirement for Project Labor Agreement.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) Definitions. “Labor organization” and “project labor agreement,” as used in this provision, are defined in the... offeror shall negotiate a project labor agreement with one or more labor organizations for the term of the... disruptions; (4) Set forth effective, prompt, and mutually binding procedures for resolving labor disputes...
48 CFR 52.222-33 - Notice of Requirement for Project Labor Agreement.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) Definitions. “Labor organization” and “project labor agreement,” as used in this provision, are defined in the... offeror shall negotiate a project labor agreement with one or more labor organizations for the term of the... disruptions; (4) Set forth effective, prompt, and mutually binding procedures for resolving labor disputes...
Myths and realities: Defining re-engineering for a large organization
NASA Technical Reports Server (NTRS)
Yin, Sandra; Mccreary, Julia
1992-01-01
This paper describes the background and results of three studies concerning software reverse engineering, re-engineering, and reuse (R3) hosted by the Internal Revenue Service in 1991 and 1992. The situation at the Internal Revenue--aging, piecemeal computer systems and outdated technology maintained by a large staff--is familiar to many institutions, especially among management information systems. The IRS is distinctive for the sheer magnitude and diversity of its problems; the country's tax records are processed using assembly language and COBOL and spread across tape and network DBMS files. How do we proceed with replacing legacy systems? The three software re-engineering studies looked at methods, CASE tool support, and performed a prototype project using re-engineering methods and tools. During the course of these projects, we discovered critical issues broader than the mechanical definitions of methods and tool technology.
NASA Astrophysics Data System (ADS)
Smyrnakis, Christos; Phocas-Cosmetatos, Alex; Kynigalakis, Kostantinos
2016-05-01
Large scale Concentrated Solar Power (CSP) plants need large plots of land with very high solar resource and thus are often deployed in desert areas which are usually owned by the state or a municipal authority. This study discusses the implication and practices of land lease policies with regards to CSP development. The strategy followed on a land lease is examined by definition on a case-specific basis and this text is by no means exhaustive with regards to its content. The study also discusses the pricing of land in various cases, presents the governing types of land lease and their effect on the economic performance of hypothetical CSP projects under various cases.
Hormone Purification by Isoelectric Focusing
NASA Technical Reports Server (NTRS)
Bier, M.
1985-01-01
Various ground-based research approaches are being applied to a more definitive evaluation of the natures and degrees of electroosmosis effects on the separation capabilities of the Isoelectric Focusing (IEF) process. A primary instrumental system for this work involves rotationally stabilized, horizontal electrophoretic columns specially adapted for the IEF process. Representative adaptations include segmentation, baffles/screens, and surface coatings. Comparative performance and development testing are pursued against the type of column or cell established as an engineering model. Previously developed computer simulation capabilities are used to predict low-gravity behavior patterns and performance for IEF apparatus geometries of direct project interest. Three existing mathematical models plus potential new routines for particular aspects of simulating instrument fluid patterns with varied wall electroosmosis influences are being exercised.
Customer premise service study for 30/20 GHz satellite system
NASA Technical Reports Server (NTRS)
Milton, R. T.; Ross, D. P.; Harcar, A. R.; Freedenberg, P.; Schoen, D.
1983-01-01
Satellite systems in which the space segment operates in the 30/20 GHz frequency band are defined and compared as to their potential for providing various types of communications services to customer premises and the economic and technical feasibility of doing so. Technical tasks performed include: market postulation, definition of the ground segment, definition of the space segment, definition of the integrated satellite system, service costs for satellite systems, sensitivity analysis, and critical technology. Based on an analysis of market data, a sufficiently large market for services is projected so as to make the system economically viable. A large market, and hence a high capacity satellite system, is found to be necessary to minimize service costs, i.e., economy of scale is found to hold. The wide bandwidth expected to be available in the 30/20 GHz band, along with frequency reuse which further increases the effective system bandwidth, makes possible the high capacity system. Extensive ground networking is required in most systems to both connect users into the system and to interconnect Earth stations to provide spatial diversity. Earth station spatial diversity is found to be a cost effective means of compensating the large fading encountered in the 30/20 GHz operating band.
Product Structure, the Heart of Product Definition
NASA Technical Reports Server (NTRS)
DeHoog, C., Jr.
1999-01-01
This paper describes the LMMSS Product Definition System (PDS) philosophy and approach were the use of each item parts document or software can be traced to a specific end item (EI) serial/tail number of the product. It explains why a part-oriented approach to data organization and configuration management is required. The definition of part-oriented is that all appropriate product definition data products will be collected. Referenced and managed by their linkage/relationship to parts/items, The paper will touch upon how LMMSS store/controls product definition information under each project's top product designator in a two tiered approach. One tier for each product end item and another tier which contain/controls listings of drawings, documents. Specifications and standards that are required for hardware item definition.
Engineering Technical Review Planning Briefing
NASA Technical Reports Server (NTRS)
Gardner, Terrie
2012-01-01
The general topics covered in the engineering technical planning briefing are 1) overviews of NASA, Marshall Space Flight Center (MSFC), and Engineering, 2) the NASA Systems Engineering(SE) Engine and its implementation , 3) the NASA Project Life Cycle, 4) MSFC Technical Management Branch Services in relation to the SE Engine and the Project Life Cycle , 5) Technical Reviews, 6) NASA Human Factor Design Guidance , and 7) the MSFC Human Factors Team. The engineering technical review portion of the presentation is the primary focus of the overall presentation and will address the definition of a design review, execution guidance, the essential stages of a technical review, and the overall review planning life cycle. Examples of a technical review plan content, review approaches, review schedules, and the review process will be provided and discussed. The human factors portion of the presentation will focus on the NASA guidance for human factors. Human factors definition, categories, design guidance, and human factor specialist roles will be addressed. In addition, the NASA Systems Engineering Engine description, definition, and application will be reviewed as background leading into the NASA Project Life Cycle Overview and technical review planning discussion.
The future role of the family physician in the United States: a rigorous exercise in definition.
Phillips, Robert L; Brundgardt, Stacy; Lesko, Sarah E; Kittle, Nathan; Marker, Jason E; Tuggy, Michael L; Lefevre, Michael L; Borkan, Jeffrey M; Degruy, Frank V; Loomis, Glenn A; Krug, Nathan
2014-01-01
As the U.S. health care delivery system undergoes rapid transformation, there is an urgent need to define a comprehensive, evidence-based role for the family physician. A Role Definition Group made up of members of seven family medicine organizations developed a statement defining the family physician's role in meeting the needs of individuals, the health care system, and the country. The Role Definition Group surveyed more than 50 years of foundational manuscripts including published works from the Future of Family Medicine project and Keystone III conference, external reviews, and a recent Accreditation Council on Graduate Medical Education Family Medicine Milestones definition. They developed candidate definitions and a "foil" definition of what family medicine could become without change. The following definition was selected: "Family physicians are personal doctors for people of all ages and health conditions. They are a reliable first contact for health concerns and directly address most health care needs. Through enduring partnerships, family physicians help patients prevent, understand, and manage illness, navigate the health system and set health goals. Family physicians and their staff adapt their care to the unique needs of their patients and communities. They use data to monitor and manage their patient population, and use best science to prioritize services most likely to benefit health. They are ideal leaders of health care systems and partners for public health." This definition will guide the second Future of Family Medicine project and provide direction as family physicians, academicians, clinical networks, and policy-makers negotiate roles in the evolving health system.
The Future Role of the Family Physician in the United States: A Rigorous Exercise in Definition
Phillips, Robert L.; Brundgardt, Stacy; Lesko, Sarah E.; Kittle, Nathan; Marker, Jason E.; Tuggy, Michael L.; LeFevre, Michael L.; Borkan, Jeffrey M.; DeGruy, Frank V.; Loomis, Glenn A.; Krug, Nathan
2014-01-01
As the US health care delivery system undergoes rapid transformation, there is an urgent need to define a comprehensive, evidence-based role for the family physician. A Role Definition Group made up of members of seven family medicine organizations developed a statement defining the family physician’s role in meeting the needs of individuals, the health care system, and the country. The Role Definition Group surveyed more than 50 years of foundational manuscripts including published works from the Future of Family Medicine project and Keystone III conference, external reviews, and a recent Accreditation Council on Graduate Medical Education Family Medicine Milestones definition. They developed candidate definitions and a “foil” definition of what family medicine could become without change. The following definition was selected: “Family physicians are personal doctors for people of all ages and health conditions. They are a reliable first contact for health concerns and directly address most health care needs. Through enduring partnerships, family physicians help patients prevent, understand, and manage illness, navigate the health system and set health goals. Family physicians and their staff adapt their care to the unique needs of their patients and communities. They use data to monitor and manage their patient population, and use best science to prioritize services most likely to benefit health. They are ideal leaders of health care systems and partners for public health.” This definition will guide the second Future of Family Medicine project and provide direction as family physicians, academicians, clinical networks, and policy-makers negotiate roles in the evolving health system. PMID:24821896
NASA Technical Reports Server (NTRS)
Abney, Morgan B.; Perry, Jay L.
2016-01-01
Over the last 55 years, NASA has evolved life support for crewed space exploration vehicles from simple resupply during Project Mercury to the complex and highly integrated system of systems aboard the International Space Station. As NASA targets exploration destinations farther from low Earth orbit and mission durations of 500 to 1000 days, life support systems must evolve to meet new requirements. In addition to having more robust, reliable, and maintainable hardware, limiting resupply becomes critical for managing mission logistics and cost. Supplying a crew with the basics of food, water, and oxygen become more challenging as the destination ventures further from Earth. Aboard ISS the Atmosphere Revitalization Subsystem (ARS) supplies the crew's oxygen demand by electrolyzing water. This approach makes water a primary logistics commodity that must be managed carefully. Chemical reduction of metabolic carbon dioxide (CO2) provides a method of recycling oxygen thereby reducing the net ARS water demand and therefore minimizing logistics needs. Multiple methods have been proposed to achieve this recovery and have been reported in the literature. However, depending on the architecture and the technology approach, "oxygen recovery" can be defined in various ways. This discontinuity makes it difficult to compare technologies directly. In an effort to clarify community discussions of Oxygen Recovery, we propose specific definitions and describe the methodology used to arrive at those definitions. Additionally, we discuss key performance parameters for Oxygen Recovery technology development including challenges with comparisons to state-of-the-art.
van Roozendaal, Lori M.; Strobbe, Luc J. A.; Aebi, Stefan; Cameron, David A.; Dixon, J. Michael; Giuliano, Armando E.; Haffty, Bruce G.; Hickey, Brigid E.; Hudis, Clifford A.; Klimberg, V. Suzanne; Koczwara, Bogda; Kühn, Thorsten; Lippman, Marc E.; Lucci, Anthony; Piccart, Martine; Smith, Benjamin D.; Tjan-Heijnen, Vivianne C. G.; van de Velde, Cornelis J. H.; Van Zee, Kimberly J.; Vermorken, Jan B.; Viale, Giuseppe; Voogd, Adri C.; Wapnir, Irene L.; White, Julia R.; Smidt, Marjolein L.
2014-01-01
Background In breast cancer studies, many different endpoints are used. Definitions are often not provided or vary between studies. For instance, “local recurrence” may include different components in similar studies. This limits transparency and comparability of results. This project aimed to reach consensus on the definitions of local event, second primary breast cancer, regional and distant event for breast cancer studies. Methods The RAND-UCLA Appropriateness method (modified Delphi method) was used. A Consensus Group of international breast cancer experts was formed, including representatives of all involved clinical disciplines. Consensus was reached in two rounds of online questionnaires and one meeting. Results Twenty-four international breast cancer experts participated. Consensus was reached on 134 items in four categories. Local event is defined as any epithelial breast cancer or ductal carcinoma in situ (DCIS) in the ipsilateral breast, or skin and subcutaneous tissue on the ipsilateral thoracic wall. Second primary breast cancer is defined as epithelial breast cancer in the contralateral breast. Regional events are breast cancer in ipsilateral lymph nodes. A distant event is breast cancer in any other location. Therefore, this includes metastasis in contralateral lymph nodes and breast cancer involving the sternal bone. If feasible, tissue sampling of a first, solitary, lesion suspected for metastasis is highly recommended. Conclusion This project resulted in consensus-based event definitions for classification of recurrence in breast cancer research. Future breast cancer research projects should adopt these definitions to increase transparency. This should facilitate comparison of results and conducting reviews as well as meta-analysis. PMID:25381395
Accepting Roles Created for Us: The Ethics of Reciprocity.
ERIC Educational Resources Information Center
Powell, Katrina M.; Takayoshi, Pamela
2003-01-01
Argues that seeing reciprocity as a context-based process of definition and re-definition of the relationship between participants and researchers helps them understand how research projects can benefit participants in ways that they desire. Considers the ethical dimensions of reciprocal research relationships. Uses the authors' own research…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-03
...--Charter Schools Program (CSP) Grants for National Leadership Activities AGENCY: Office of Innovation and..., requirements, and definitions for CSP Grants for National Leadership Activities and may use these priorities... Secretary is taking this action to ensure that projects funded with CSP Grants for National Leadership...
Code of Federal Regulations, 2012 CFR
2012-01-01
... means an event or condition that is external to the project and that is of direct importance to the... § 1290.2 Definitions. (a) AMS means the Agricultural Marketing Service of the U. S. Department of Agriculture. (b) Application means application for Specialty Crop Block Grant Program. (c) “Enhancing the...
Code of Federal Regulations, 2014 CFR
2014-01-01
... means an event or condition that is external to the project and that is of direct importance to the... § 1290.2 Definitions. (a) AMS means the Agricultural Marketing Service of the U. S. Department of Agriculture. (b) Application means application for Specialty Crop Block Grant Program. (c) “Enhancing the...
Code of Federal Regulations, 2013 CFR
2013-01-01
... means an event or condition that is external to the project and that is of direct importance to the... § 1290.2 Definitions. (a) AMS means the Agricultural Marketing Service of the U. S. Department of Agriculture. (b) Application means application for Specialty Crop Block Grant Program. (c) “Enhancing the...
Code of Federal Regulations, 2011 CFR
2011-01-01
... means an event or condition that is external to the project and that is of direct importance to the... § 1290.2 Definitions. (a) AMS means the Agricultural Marketing Service of the U. S. Department of Agriculture. (b) Application means application for Specialty Crop Block Grant Program. (c) “Enhancing the...
7 CFR 1783.3 - What definitions are used in this regulation?
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 12 2010-01-01 2010-01-01 false What definitions are used in this regulation? 1783.3 Section 1783.3 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE (CONTINUED) REVOLVING FUNDS FOR FINANCING WATER AND WASTEWATER PROJECTS...
40 CFR 262.102 - What special definitions are included in this subpart?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Laboratories XL Project-Laboratory Environmental Management Standard § 262.102 What special definitions are... Laboratory Waste means a laboratory waste, defined in the Environmental Management Plan as posing significant... Management Plan (EMP) means a written program developed and implemented by the university which sets forth...
Engaging FCS Partners in an International Service Learning Initiative
ERIC Educational Resources Information Center
Keino, Leah C.; Torrie, Margaret C.; Hausafus, Cheryl O.; Trost, Betty C.
2010-01-01
Several definitions of service learning exist. For this initiative, the authors used Torres and Sinton's (2000) definition that students are learning about social issues and applying new knowledge to real problems in their communities. This project entailed a partnership of committed citizens of different groups (middle, secondary, and university…
Code of Federal Regulations, 2011 CFR
2011-04-01
... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Definitions. 1b.1 Section 1b.1 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF... pipelines, electric utilities and hydroelectric projects. [43 FR 27174, June 23, 1978, as amended by Order...
Code of Federal Regulations, 2014 CFR
2014-01-01
... Investment Cash Advance program means: (1) A Bank's AHP; (2) A Bank's CIP; (3) A Bank's RDF program or UDF...) through (1)(iv), and (2)(i) and (2)(ii) of this definition are eligible for CIP advances. Targeted...; (3) For advances provided under CIP: (i) For economic development projects, incomes at or below 80...
Code of Federal Regulations, 2011 CFR
2011-01-01
... CIP; (3) A Bank's RDF program or UDF program using any combination of the targeted beneficiaries and... paragraphs (1)(i) through (1)(iv), and (2)(i) and (2)(ii) of this definition are eligible for CIP advances..., for a family of four; (3) For advances provided under CIP: (i) For economic development projects...
Code of Federal Regulations, 2012 CFR
2012-01-01
... CIP; (3) A Bank's RDF program or UDF program using any combination of the targeted beneficiaries and... paragraphs (1)(i) through (1)(iv), and (2)(i) and (2)(ii) of this definition are eligible for CIP advances..., for a family of four; (3) For advances provided under CIP: (i) For economic development projects...
Code of Federal Regulations, 2013 CFR
2013-01-01
... CIP; (3) A Bank's RDF program or UDF program using any combination of the targeted beneficiaries and... paragraphs (1)(i) through (1)(iv), and (2)(i) and (2)(ii) of this definition are eligible for CIP advances..., for a family of four; (3) For advances provided under CIP: (i) For economic development projects...
34 CFR 376.4 - What definitions apply to this program?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 2 2010-07-01 2010-07-01 false What definitions apply to this program? 376.4 Section 376.4 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION SPECIAL PROJECTS AND DEMONSTRATIONS...
7 CFR 1783.3 - What definitions are used in this regulation?
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 12 2014-01-01 2013-01-01 true What definitions are used in this regulation? 1783.3 Section 1783.3 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE (CONTINUED) REVOLVING FUNDS FOR FINANCING WATER AND WASTEWATER PROJECTS...
7 CFR 1783.3 - What definitions are used in this regulation?
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 12 2011-01-01 2011-01-01 false What definitions are used in this regulation? 1783.3 Section 1783.3 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE (CONTINUED) REVOLVING FUNDS FOR FINANCING WATER AND WASTEWATER PROJECTS...
7 CFR 1783.3 - What definitions are used in this regulation?
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 12 2012-01-01 2012-01-01 false What definitions are used in this regulation? 1783.3 Section 1783.3 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE (CONTINUED) REVOLVING FUNDS FOR FINANCING WATER AND WASTEWATER PROJECTS...
7 CFR 1783.3 - What definitions are used in this regulation?
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 12 2013-01-01 2013-01-01 false What definitions are used in this regulation? 1783.3 Section 1783.3 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE (CONTINUED) REVOLVING FUNDS FOR FINANCING WATER AND WASTEWATER PROJECTS...
Code of Federal Regulations, 2014 CFR
2014-07-01
... means any object or assemblage of objects, regardless of age, whether in situ or not, that may carry... structure made up of interdependent and interrelated parts in a definite pattern or organization. Constructed by humans, it is often an engineering project large in scale. An aircraft wreck or shipwreck is a...
18 CFR 11.10 - General provision; waiver and exemptions; definitions.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false General provision; waiver and exemptions; definitions. 11.10 Section 11.10 Conservation of Power and Water Resources FEDERAL... upstream, project, usually by increasing or decreasing the release of water from a storage reservoir. (b...
18 CFR 11.10 - General provision; waiver and exemptions; definitions.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false General provision; waiver and exemptions; definitions. 11.10 Section 11.10 Conservation of Power and Water Resources FEDERAL... upstream, project, usually by increasing or decreasing the release of water from a storage reservoir. (b...
18 CFR 11.10 - General provision; waiver and exemptions; definitions.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false General provision; waiver and exemptions; definitions. 11.10 Section 11.10 Conservation of Power and Water Resources FEDERAL... upstream, project, usually by increasing or decreasing the release of water from a storage reservoir. (b...
18 CFR 11.10 - General provision; waiver and exemptions; definitions.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false General provision; waiver and exemptions; definitions. 11.10 Section 11.10 Conservation of Power and Water Resources FEDERAL... upstream, project, usually by increasing or decreasing the release of water from a storage reservoir. (b...
18 CFR 11.10 - General provision; waiver and exemptions; definitions.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false General provision; waiver and exemptions; definitions. 11.10 Section 11.10 Conservation of Power and Water Resources FEDERAL... upstream, project, usually by increasing or decreasing the release of water from a storage reservoir. (b...
DIRAC File Replica and Metadata Catalog
NASA Astrophysics Data System (ADS)
Tsaregorodtsev, A.; Poss, S.
2012-12-01
File replica and metadata catalogs are essential parts of any distributed data management system, which are largely determining its functionality and performance. A new File Catalog (DFC) was developed in the framework of the DIRAC Project that combines both replica and metadata catalog functionality. The DFC design is based on the practical experience with the data management system of the LHCb Collaboration. It is optimized for the most common patterns of the catalog usage in order to achieve maximum performance from the user perspective. The DFC supports bulk operations for replica queries and allows quick analysis of the storage usage globally and for each Storage Element separately. It supports flexible ACL rules with plug-ins for various policies that can be adopted by a particular community. The DFC catalog allows to store various types of metadata associated with files and directories and to perform efficient queries for the data based on complex metadata combinations. Definition of file ancestor-descendent relation chains is also possible. The DFC catalog is implemented in the general DIRAC distributed computing framework following the standard grid security architecture. In this paper we describe the design of the DFC and its implementation details. The performance measurements are compared with other grid file catalog implementations. The experience of the DFC Catalog usage in the CLIC detector project are discussed.
Measurement of household food security in the USA and other industrialised countries.
Radimer, Kathy L; Radimer, Kathy L
2002-12-01
To describe the history and current status of household food security measurement. In the 1980s evidence of rising levels of hunger was a concern for many, but disputed by some, Americans. Acknowledgement and quantification of hunger was hindered by the lack of an accepted definition and measure of hunger. Qualitative research at Cornell provided a conceptual framework, description, definition and survey items for hunger. The Community Childhood Hunger Identification Project developed an instrument used in numerous communities. Based upon these initiatives, widely accepted definitions of hunger and food insecurity, and the US Household Food Security Module for its measurement, now exist. The module classifies households as food-secure, or food-insecure without hunger or with moderate or severe hunger, and contains household-, adult- and child-referent items. Its inclusion in the Current Population Survey (CPS) since 1995 has yielded annual estimates of food insecurity. A six-item short form of the module, for surveys with severe time constraints, classifies households only as food-secure or food-insecure without or with hunger and contains no child-specific items. Surveys using the 18-item or short-form module can compare results with published national data from the CPS. Information about the module is available at http://www.ers.usda.gov/briefing/foodsecurity and http://www.fns.usda/fsec. Current research on food security measurement includes measurement of individual food insecurity and hunger, module performance regarding hunger duration and frequency, performance of the module in population sub-groups, and the effect of translations on module meaning and performance. National surveys in Canada, New Zealand and Australia also have measured food security.
NASA Technical Reports Server (NTRS)
1982-01-01
The Current and Advanced Technology ACT control system definition tasks of the Integrated Application of Active Controls (IAAC) Technology project within the Energy Efficient Transport Program are summarized. The systems mechanize six active control functions: (1) pitch augmented stability; (2) angle of attack limiting; (3) lateral/directional augmented stability; (4) gust load alleviation; (5) maneuver load control; and (6) flutter mode control. The redundant digital control systems meet all function requirements with required reliability and declining weight and cost as advanced technology is introduced.
Digital image processing using parallel computing based on CUDA technology
NASA Astrophysics Data System (ADS)
Skirnevskiy, I. P.; Pustovit, A. V.; Abdrashitova, M. O.
2017-01-01
This article describes expediency of using a graphics processing unit (GPU) in big data processing in the context of digital images processing. It provides a short description of a parallel computing technology and its usage in different areas, definition of the image noise and a brief overview of some noise removal algorithms. It also describes some basic requirements that should be met by certain noise removal algorithm in the projection to computer tomography. It provides comparison of the performance with and without using GPU as well as with different percentage of using CPU and GPU.
Managing Analysis Models in the Design Process
NASA Technical Reports Server (NTRS)
Briggs, Clark
2006-01-01
Design of large, complex space systems depends on significant model-based support for exploration of the design space. Integrated models predict system performance in mission-relevant terms given design descriptions and multiple physics-based numerical models. Both the design activities and the modeling activities warrant explicit process definitions and active process management to protect the project from excessive risk. Software and systems engineering processes have been formalized and similar formal process activities are under development for design engineering and integrated modeling. JPL is establishing a modeling process to define development and application of such system-level models.
NASA Technical Reports Server (NTRS)
Wetherholt, Jon; Heimann, Timothy J.; Anderson, Brenda
2011-01-01
High technology industries with high failure costs commonly use redundancy as a means to reduce risk. Redundant systems, whether similar or dissimilar, are susceptible to Common Cause Failures (CCF). CCF is not always considered in the design effort and, therefore, can be a major threat to success. There are several aspects to CCF which must be understood to perform an analysis which will find hidden issues that may negate redundancy. This paper will provide definition, types, a list of possible causes and some examples of CCF. Requirements and designs from NASA projects will be used in the paper as examples.
Instrumentation development for the EUVE. [Extreme Ultraviolet Explorer Satellite
NASA Technical Reports Server (NTRS)
Finley, D.
1980-01-01
The prototype mirror was successfully replated with a thick layer of nickel and diamond turned again. Optimization of the sensitivity of the instruments was studied with emphasis on the filter material, and on the available telemetry. The JHU Preliminary Project Definition Document was critically analyzed. Further studies of the electron cloud distribution produced by a channel plate were performed, and a wedge and strip anode with 17 quartets per inch was shown to image with better than 0.5% linearity. Half the microchannel plates being used in the lifetest completed initial processing and are in the lifetest vacuum chamber.
Concordance between European and US case definitions of healthcare-associated infections
2012-01-01
Background Surveillance of healthcare-associated infections (HAI) is a valuable measure to decrease infection rates. Across Europe, inter-country comparisons of HAI rates seem limited because some countries use US definitions from the US Centers for Disease Control and Prevention (CDC/NHSN) while other countries use European definitions from the Hospitals in Europe Link for Infection Control through Surveillance (HELICS/IPSE) project. In this study, we analyzed the concordance between US and European definitions of HAI. Methods An international working group of experts from seven European countries was set up to identify differences between US and European definitions and then conduct surveillance using both sets of definitions during a three-month period (March 1st -May 31st, 2010). Concordance between case definitions was estimated with Cohen’s kappa statistic (κ). Results Differences in HAI definitions were found for bloodstream infection (BSI), pneumonia (PN), urinary tract infection (UTI) and the two key terms “intensive care unit (ICU)-acquired infection” and “mechanical ventilation”. Concordance was analyzed for these definitions and key terms with the exception of UTI. Surveillance was performed in 47 ICUs and 6,506 patients were assessed. One hundred and eighty PN and 123 BSI cases were identified. When all PN cases were considered, concordance for PN was κ = 0.99 [CI 95%: 0.98-1.00]. When PN cases were divided into subgroups, concordance was κ = 0.90 (CI 95%: 0.86-0.94) for clinically defined PN and κ = 0.72 (CI 95%: 0.63-0.82) for microbiologically defined PN. Concordance for BSI was κ = 0.73 [CI 95%: 0.66-0.80]. However, BSI cases secondary to another infection site (42% of all BSI cases) are excluded when using US definitions and concordance for BSI was κ = 1.00 when only primary BSI cases, i.e. Europe-defined BSI with ”catheter” or “unknown” origin and US-defined laboratory-confirmed BSI (LCBI), were considered. Conclusions Our study showed an excellent concordance between US and European definitions of PN and primary BSI. PN and primary BSI rates of countries using either US or European definitions can be compared if the points highlighted in this study are taken into account. PMID:22958646
Program definition and assessment overview. [for thermal energy storage project management
NASA Technical Reports Server (NTRS)
Gordon, L. H.
1980-01-01
The implementation of a program level assessment of thermal energy storage technology thrusts for the near and far term to assure overall coherent energy storage program is considered. The identification and definition of potential thermal energy storage applications, definition of technology requirements, and appropriate market sectors are discussed along with the necessary coordination, planning, and preparation associated with program reviews, workshops, multi-year plans and annual operating plans for the major laboratory tasks.
ERIC Educational Resources Information Center
Bitz, Michael
2010-01-01
This definitive book presents the newest research linking graphic narratives and literacy learning, as well as the tools teachers will need to make comic book projects a success in their classrooms. The Comic Book Project (www.comicbookproject.org) is an internationally celebrated initiative where children plan, write, design, and publish original…
ERIC Educational Resources Information Center
Jacobs, James N., Ed.; Felix, Joseph L., Ed.
1966-01-01
This evaluation of Cincinnati's Title I projects for the disadvantaged public school students notes that definitive statements about measurable results are unrealistic because the projects were evaluated after only 5 months in operation. However the evaluation establishes baseline data. Information about the 13 Title I projects was gathered from…
Experiential and Cooperative Learning: Using a Situation Analysis Project in Principles of Marketing
ERIC Educational Resources Information Center
Munoz, Caroline; Huser, Ann
2008-01-01
In this article, the authors propose a semester-long experiential-learning project for introductory marketing students. The project requires an analysis of a product category, competition, and consumer base to support a new product proposal. The purpose is to (a) put into practice the concepts and definitions taught in an introductory marketing…
Mindful Persistence: Literacies for Taking up and Sustaining Fermented-Food Projects
ERIC Educational Resources Information Center
Santana, Christina; Kuznetsov, Stacey; Schmeckpeper, Sheri; Curry, Linda J.; Long, Elenore; Davis, Lauren; Koerner, Heidi; McQuarrie, Kimberly Butterfield
2015-01-01
Almost by definition, resisting the insidious convenience of the mainstream food supply requires persistence. This is especially true for food projects requiring fermentation--projects that unfold over days or weeks and require day-to-day science in kitchens where variables can be hard to control and where some degree of periodic failure is almost…
Code of Federal Regulations, 2010 CFR
2010-07-01
... Administration DEPARTMENT OF JUSTICE CONFIDENTIALITY OF IDENTIFIABLE RESEARCH AND STATISTICAL INFORMATION § 22.2... capacity. (c) Research or statistical project means any program, project, or component thereof which is... statistical information means any information which is collected during the conduct of a research or...
Code of Federal Regulations, 2014 CFR
2014-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS VALUE ENGINEERING... construction. Value Engineering (VE) analysis. The systematic process of reviewing and assessing a project by a...; and (3) Reducing the time to develop and deliver the project. Value Engineering (VE) Job Plan. A...
Code of Federal Regulations, 2013 CFR
2013-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS VALUE ENGINEERING... construction. Value Engineering (VE) analysis. The systematic process of reviewing and assessing a project by a...; and (3) Reducing the time to develop and deliver the project. Value Engineering (VE) Job Plan. A...
Code of Federal Regulations, 2012 CFR
2012-01-01
... ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of... project means research and development under the Act by employees of a Federal agency furnishing.... DOE project means research and development under the Act by employees of the DOE. Federal agency means...
Code of Federal Regulations, 2014 CFR
2014-01-01
... ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of... project means research and development under the Act by employees of a Federal agency furnishing.... DOE project means research and development under the Act by employees of the DOE. Federal agency means...
Code of Federal Regulations, 2010 CFR
2010-01-01
... ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of... project means research and development under the Act by employees of a Federal agency furnishing.... DOE project means research and development under the Act by employees of the DOE. Federal agency means...
Code of Federal Regulations, 2013 CFR
2013-01-01
... ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of... project means research and development under the Act by employees of a Federal agency furnishing.... DOE project means research and development under the Act by employees of the DOE. Federal agency means...
Code of Federal Regulations, 2011 CFR
2011-01-01
... ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of... project means research and development under the Act by employees of a Federal agency furnishing.... DOE project means research and development under the Act by employees of the DOE. Federal agency means...
7 CFR 1206.50 - Programs, plans, and projects.
Code of Federal Regulations, 2011 CFR
2011-01-01
... PROMOTION, RESEARCH, AND INFORMATION Mango Promotion, Research, and Information Order Definitions Promotion, Research, and Information § 1206.50 Programs, plans, and projects. (a) The Board shall receive and evaluate... establishment, issuance, effectuation, and administration of appropriate programs for promotion, research, and...
Code of Federal Regulations, 2012 CFR
2012-10-01
... Management and Project Management, of OFFP memorandum entitled “The Federal Acquisition Certification for... Handbook. See also Appendix D, Relationship between Program Management and Project Management, of OFFP... typically a mid-level management official, usually an office director, division director, or branch chief...
Code of Federal Regulations, 2014 CFR
2014-10-01
... Management and Project Management, of OFFP memorandum entitled “The Federal Acquisition Certification for... Handbook. See also Appendix D, Relationship between Program Management and Project Management, of OFFP... typically a mid-level management official, usually an office director, division director, or branch chief...
Code of Federal Regulations, 2013 CFR
2013-10-01
... Management and Project Management, of OFFP memorandum entitled “The Federal Acquisition Certification for... Handbook. See also Appendix D, Relationship between Program Management and Project Management, of OFFP... typically a mid-level management official, usually an office director, division director, or branch chief...
Code of Federal Regulations, 2011 CFR
2011-10-01
... Management and Project Management, of OFFP memorandum entitled “The Federal Acquisition Certification for... Handbook. See also Appendix D, Relationship between Program Management and Project Management, of OFFP... typically a mid-level management official, usually an office director, division director, or branch chief...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Administration DEPARTMENT OF JUSTICE CONFIDENTIALITY OF IDENTIFIABLE RESEARCH AND STATISTICAL INFORMATION § 22.2... capacity. (c) Research or statistical project means any program, project, or component thereof which is... statistical information means any information which is collected during the conduct of a research or...
Atmospheric Science Data Center
2013-03-20
... projection definitions are provided for augmenting the ENVI defined map projections file, and a sample ENVI menu file which adds a menu ... | PDF Users Guide ). The misr_envi tool software can be downloaded as a tar file containing all twelve files, ...
43 CFR 404.7 - What types of projects are eligible for consideration under the program?
Code of Federal Regulations, 2011 CFR
2011-10-01
... consideration under the program, a rural water supply project must: (a) Meet the definition of a rural water... BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.7...
36 CFR 222.1 - Authority and definitions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Grasslands, Land Utilization Projects, and other Federal lands for which the Forest Service has...-ground expenditure means payment of direct project costs of implementing an improvement or development...: (i) Non-structural which are practices and treatments undertaken to improve range not involving...
Constructive Learning in Undergraduate Linear Algebra
ERIC Educational Resources Information Center
Chandler, Farrah Jackson; Taylor, Dewey T.
2008-01-01
In this article we describe a project that we used in our undergraduate linear algebra courses to help our students successfully master fundamental concepts and definitions and generate interest in the course. We describe our philosophy and discuss the projects overall success.
2013-01-01
proposed acquisition of a variety of armoured vehicle simulators for training within the Canadian Forces. The Directorate of Land Requirements (DLR... armoured vehicle operations under the Land Vehicle Crew Training System (LVCTS) project. DLR has published a Letter of Interest (LOI) to solicit input...LVCTS project staff to discuss the intent of the project. Qualification Standards and Training Plans for several military armoured vehicle
NASA Astrophysics Data System (ADS)
Civetta, Lucia; Del Pezzo, Edoardo
2010-05-01
In this poster we present the framework of the Project "UNREST" and the preliminary results obtained in the first 18 months of activity. The Campi Flegrei resurgent caldera, where several hundred thousands people live, have been characterized during last decades by several bradiseismic crises which determined the partial evacuation of the population, as for the crises in 1969-72 and 1982-84. Recent studies have revealed a process of unrest which continues since the fifties, and which presents characteristics similar to the several centuries-decades long unrest period which led to the last eruption in AD 1538. In the frame of last INGV-DPC Agreement a method has been developed, which allows accounting of any information and associated uncertainty coming from historical, field, and modelling studies, and from the monitoring network, providing a probability on the state of the volcano and on the occurrence of an eruption. In the present project this method is explored and developed, particularly through the experimentation of methods for the definition of reference parameters and thresholds, and of criteria and procedures to make it an operational tool useful for volcano surveillance and crisis management. The research in the project include the following points: a) Definition of the reference database for the validation of models of pre-eruptive dynamics. The database will include geologic, geophysic, geochemical, hydrological and hystorical data. b) Quantitative analysis of measured signals, and formulation of hypotheses on source mechanisms. c) Definition of a general conceptual model for the magma-rocks-geothermal system at Campi Flegrei. d) Physico-mathematical modelling and numerical simulation of the magmatic and geothermal process dynamics, and of the space-time relationships between such dynamics and the geophysical and geochemical signals measured at the surface. e) Definition of the critical parameters for the definition of the different unrest phases, and development of possible new methods for their determination. f) Realization of a prototype of an integrated multidisciplinary system for short term volcano hazard evaluation. This system should integrate the information coming from the monitoring network, the models and simulations, and any other kind of information source in the project, within a simple and efficient scheme like the Event Tree one. This should be useful in real time during emergencies, either real or simulated. g) Study of the methods for the operational use of the prototype above, and of the modalities for interfacing it with the DPC Functional Center.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-04
... innovative control technology as an alternative to BACT requirements and make other changes as described in... Reasonably Available Control Technology, the initials BACT mean or refer to Best Available Control Technology... definitions also included the definition of Pollution Control Projects at existing electric utility steam...
Code of Federal Regulations, 2014 CFR
2014-10-01
... amended (42 U.S.C. 4321 et seq.); and the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et... CONSERVATION PLAN § 10005.2 Definitions. The Act refers to the Central Utah Project Completion Act, Titles II... Conservation Commission, as established by section 301 of the Act. Interested parties refers to Federal and...
Code of Federal Regulations, 2011 CFR
2011-10-01
... amended (42 U.S.C. 4321 et seq.); and the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et... CONSERVATION PLAN § 10005.2 Definitions. The Act refers to the Central Utah Project Completion Act, Titles II... Conservation Commission, as established by section 301 of the Act. Interested parties refers to Federal and...
Code of Federal Regulations, 2013 CFR
2013-10-01
... amended (42 U.S.C. 4321 et seq.); and the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et... CONSERVATION PLAN § 10005.2 Definitions. The Act refers to the Central Utah Project Completion Act, Titles II... Conservation Commission, as established by section 301 of the Act. Interested parties refers to Federal and...
Code of Federal Regulations, 2012 CFR
2012-10-01
... amended (42 U.S.C. 4321 et seq.); and the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et... CONSERVATION PLAN § 10005.2 Definitions. The Act refers to the Central Utah Project Completion Act, Titles II... Conservation Commission, as established by section 301 of the Act. Interested parties refers to Federal and...
ERIC Educational Resources Information Center
Lindsay, Carl A.; Southworth, Harrison T.
The first of three phases to provide the Pennsylvania Public Television Network (PPTN) and its seven component stations with information and procedures for defining, estimating and characterizing audiences, as well as developing programs and assessing reactions to them, this study concentrated on establishing audience definitions. The basic…
Yurok Redwood Experimental Forest
Kenneth N. Boe
1983-01-01
This historical sketch is presented as a Volunteer in National Forest project. It was started in November, 1982 when then Director Robert Callahan asked me if I would be interested in researching and writing a history--both factual and anecdotal. It is definitely not definitive but I think it adequately sketches the acquisition period, with names of the principal...
Code of Federal Regulations, 2010 CFR
2010-10-01
... SPECIAL PROGRAMS AND PROJECTS Recognition of State Reimbursement Control Systems § 403.302 Definitions... CMS under the authority of section 402(a) of the Social Security Amendments of 1967 (42 U.S.C. 1395b-1) or section 222(a) of the Social Security Amendments of 1972 (42 U.S.C. 1395b-1 (note)) and in effect...
78 FR 10265 - Proposed Collection; Comment Request for Regulation Project
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-13
... 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning Definition of... received on or before April 15, 2013 to be assured of consideration. ADDRESSES: Direct all written comments... INFORMATION: Title: Definition of Contribution in Aid of Construction Under Section 118(c). OMB Number: 1545...
75 FR 51880 - Proposed Collection; Comment Request for Regulation Project
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-23
...), Definition of Contribution in Aid of Construction Under Section 118(c)(Sec. 1.118-2). DATES: Written comments should be received on or before October 22, 2010 to be assured of consideration. ADDRESSES: Direct all... . SUPPLEMENTARY INFORMATION: Title: Definition of Contribution in Aid of Construction Under Section 118(c). OMB...
MED-SUV final strategic issues
NASA Astrophysics Data System (ADS)
Spampinato, Letizia; Puglisi, Giuseppe; Sangianantoni, Agata
2016-04-01
Aside the scientific, technical and financial aspects managed by the "Project Management" Work Package (WP1), the great challenge and more time consuming task of this WP has surely been the definition and application of some strategic guidelines crucial to trace the project right path to its final success and for the project outcome sustainability after month 36. In particular, given that one of the main objectives of MED-SUV is that to be compliant with the GEO initiative, particularly concerning the data sharing, great efforts have been made by WP1 at first to define the MED-SUV Data Policy Guidelines, and currently to make it suitable for the EU Supersites. At present, WP1 is also dealing with the exploitation of the achieved foreground among the project's participant and to define a Memorandum of Understanding to sustain the monitoring systems and e-infrastructure developed in the project framework. Whilst the Data Policy guidelines document was implemented in the first year of MED-SUV, WP1 is now focused on the last deliverable 'Strategic and Legal deliverables', which includes the remaining issues. To the aim, WP1 has strategically separated the Exploitation of Foreground document preparation from the Memorandum of Understanding definition. The Exploitation of Foreground process has regarded the identification of Foreground, the exploitable results, the purpose of such Foreground, the collection of information from either the scientific community of MED-SUV or industrial participants; to this aim WP1 circulated an ad hoc questionnaire to put together information on (the) every kind of MED-SUV outcome, on their owners, on the kind of ownership (single/joint), on the outcome exploitation, and on proposals for its sustainability. While the first information will allow us to prepare the final Exploitation Agreement among the project's participant, the information on the exploitation of the outcome and likely sustainability proposals will contribute to the definition of the project Memorandum of Understanding for the maintenance of the developed instrumentation and of the MED-SUV e-infrastructure following the project end.
NASA Technical Reports Server (NTRS)
1971-01-01
A description is given of the proposed project organization, documentation and reports, project planning, direction and control, related experience and facilities, and cost estimate data and options for the implementation of the bioresearch module development program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... App. U.S.C. 1101 through 1294). Actual Cost of a Vessel or Shipyard Project means, as of any specified... thereafter, for the construction, reconstruction or reconditioning of such Vessel or Shipyard Project. Advanced Shipbuilding Technology means: (1) Numerically controlled machine tools, robots, automated process...
Code of Federal Regulations, 2011 CFR
2011-10-01
... App. U.S.C. 1101 through 1294). Actual Cost of a Vessel or Shipyard Project means, as of any specified... thereafter, for the construction, reconstruction or reconditioning of such Vessel or Shipyard Project. Advanced Shipbuilding Technology means: (1) Numerically controlled machine tools, robots, automated process...
Code of Federal Regulations, 2014 CFR
2014-10-01
... App. U.S.C. 1101 through 1294). Actual Cost of a Vessel or Shipyard Project means, as of any specified... thereafter, for the construction, reconstruction or reconditioning of such Vessel or Shipyard Project. Advanced Shipbuilding Technology means: (1) Numerically controlled machine tools, robots, automated process...
Code of Federal Regulations, 2012 CFR
2012-10-01
... App. U.S.C. 1101 through 1294). Actual Cost of a Vessel or Shipyard Project means, as of any specified... thereafter, for the construction, reconstruction or reconditioning of such Vessel or Shipyard Project. Advanced Shipbuilding Technology means: (1) Numerically controlled machine tools, robots, automated process...
Code of Federal Regulations, 2013 CFR
2013-10-01
... App. U.S.C. 1101 through 1294). Actual Cost of a Vessel or Shipyard Project means, as of any specified... thereafter, for the construction, reconstruction or reconditioning of such Vessel or Shipyard Project. Advanced Shipbuilding Technology means: (1) Numerically controlled machine tools, robots, automated process...
Code of Federal Regulations, 2013 CFR
2013-04-01
..., STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects § 650.205... transporting of soil particles by water or wind, including actions that limit the area of exposed soil and... completion of the project. Pollutants are substances, including sediment, which cause deterioration of water...
Code of Federal Regulations, 2012 CFR
2012-04-01
..., STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects § 650.205... transporting of soil particles by water or wind, including actions that limit the area of exposed soil and... completion of the project. Pollutants are substances, including sediment, which cause deterioration of water...
Code of Federal Regulations, 2014 CFR
2014-04-01
..., STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects § 650.205... transporting of soil particles by water or wind, including actions that limit the area of exposed soil and... completion of the project. Pollutants are substances, including sediment, which cause deterioration of water...
Code of Federal Regulations, 2010 CFR
2010-04-01
..., STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects § 650.205... transporting of soil particles by water or wind, including actions that limit the area of exposed soil and... completion of the project. Pollutants are substances, including sediment, which cause deterioration of water...
Code of Federal Regulations, 2011 CFR
2011-04-01
..., STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects § 650.205... transporting of soil particles by water or wind, including actions that limit the area of exposed soil and... completion of the project. Pollutants are substances, including sediment, which cause deterioration of water...
EOS image data processing system definition study
NASA Technical Reports Server (NTRS)
Gilbert, J.; Honikman, T.; Mcmahon, E.; Miller, E.; Pietrzak, L.; Yorsz, W.
1973-01-01
The Image Processing System (IPS) requirements and configuration are defined for NASA-sponsored advanced technology Earth Observatory System (EOS). The scope included investigation and definition of IPS operational, functional, and product requirements considering overall system constraints and interfaces (sensor, etc.) The scope also included investigation of the technical feasibility and definition of a point design reflecting system requirements. The design phase required a survey of present and projected technology related to general and special-purpose processors, high-density digital tape recorders, and image recorders.
BOUSSOLE: A Joint CNRS-INSU, ESA, CNES, and NASA Ocean Color Calibration and Validation Activity
NASA Technical Reports Server (NTRS)
Antoine, David; Chami, Malik; Claustre, Herve; d'Ortenzio, Fabrizio; Morel, Andre; Becu, Guislain; Gentili, Bernard; Louis, Francis; Ras, Josephine; Roussier, Emmanuel;
2006-01-01
This report presents the Bouee pour l'acquisition de Series Optiques a Long Terme (BOUSSOLE) project, the primary objectives of which are to provide a long-term time series of optical properties in support of a) calibration and validation activities associated with satellite ocean color missions, and b) bio-optical research in oceanic waters. The following are included in the report: 1) an introduction to the rationale for establishing the project; 2) a definition of vicarious calibration and the specific requirements attached to it; 3) the organization of the project and the characteristics of the measurement site--in the northwestern Mediterranean Sea; 4) a qualitative overview of the collected data; 5) details about the buoy that was specifically designed and built for this project; 6) data collection protocols and data processing techniques; 7) a quantitative summary of the collected data, and a discussion of some sample results, including match-up analyses for the currently operational ocean color sensors, namely MERIS, SeaWiFS, and MODIS; and 8) preliminary results of the vicarious radiometric calibration of MERIS, including a tentative uncertainty budget. The results of this match-up analysis allow performance comparisons of various ocean color sensors to be performed, demonstrating the ability of the BOUSSOLE activity, i.e., combining a dedicated platform and commercial-off-the-shelf instrumentation, to provide data qualified to monitor the quality of ocean color products on the long term.
Eco-compensation in China: Theory, practices and suggestions for the future.
Shang, Wenxiu; Gong, Yicheng; Wang, Zhongjing; Stewardson, Michael J
2018-03-15
Eco-compensation is the most important form of compensatory conservation in China. However, this compensatory mechanism is criticized for vague definition and massive government participation. For better understanding of eco-compensation in China, this paper compares theories and practices of compensatory mechanisms in China and abroad. The analysis of theoretical backgrounds shows that eco-compensation in China is a combination of 'ecological compensation' and 'payments for ecosystem services'. Ten compensatory projects in China and abroad are assessed to reveal characteristics and problems of eco-compensation in China. The results show that compensatory projects in China lagged behind mature foreign compensatory projects in clarity of property rights, responsibility fulfillment, executive efficiency, effectiveness, sustainability and equality. The massive participation of the government is the major reason for the poor performance of compensatory projects in China. However, government participation is necessary at the present stage in China for the income gap and beneficiaries' low willingness to pay. For the improvement of eco-compensation in China, suggestions are given on the choice of non-market valuation methods, the creation of property rights and the establishment of market mechanisms. Copyright © 2018 Elsevier Ltd. All rights reserved.
Wiler, Jennifer L; Welch, Shari; Pines, Jesse; Schuur, Jeremiah; Jouriles, Nick; Stone-Griffith, Suzanne
2015-05-01
The objective was to review and update key definitions and metrics for emergency department (ED) performance and operations. Forty-five emergency medicine leaders convened for the Third Performance Measures and Benchmarking Summit held in Las Vegas, February 21-22, 2014. Prior to arrival, attendees were assigned to workgroups to review, revise, and update the definitions and vocabulary being used to communicate about ED performance and operations. They were provided with the prior definitions of those consensus summits that were published in 2006 and 2010. Other published definitions from key stakeholders in emergency medicine and health care were also reviewed and circulated. At the summit, key terminology and metrics were discussed and debated. Workgroups communicated online, via teleconference, and finally in a face-to-face meeting to reach consensus regarding their recommendations. Recommendations were then posted and open to a 30-day comment period. Participants then reanalyzed the recommendations, and modifications were made based on consensus. A comprehensive dictionary of ED terminology related to ED performance and operation was developed. This article includes definitions of operating characteristics and internal and external factors relevant to the stratification and categorization of EDs. Time stamps, time intervals, and measures of utilization were defined. Definitions of processes and staffing measures are also presented. Definitions were harmonized with performance measures put forth by the Centers for Medicare and Medicaid Services (CMS) for consistency. Standardized definitions are necessary to improve the comparability of EDs nationally for operations research and practice. More importantly, clear precise definitions describing ED operations are needed for incentive-based pay-for-performance models like those developed by CMS. This document provides a common language for front-line practitioners, managers, health policymakers, and researchers. © 2015 by the Society for Academic Emergency Medicine.
The Application of Modeling and Simulation in Capacity Management within the ITIL Framework
NASA Technical Reports Server (NTRS)
Rahmani, Sonya; vonderHoff, Otto
2010-01-01
Tightly integrating modeling and simulation techniques into Information Technology Infrastructure Library (ITIL) practices can be one of the driving factors behind a successful and cost-effective capacity management effort for any Information Technology (IT) system. ITIL is a best practices framework for managing IT infrastructure, development and operations. Translating ITIL theory into operational reality can be a challenge. This paper aims to highlight how to best integrate modeling and simulation into an ITIL implementation. For cases where the project team initially has difficulty gaining consensus on investing in modeling and simulation resources, a clear definition for M&S implementation into the ITIL framework, specifically its role in supporting Capacity Management, is critical to gaining the support required to garner these resources. This implementation should also help to clearly define M&S support to the overall system mission. This paper will describe the development of an integrated modeling approach and how best to tie M&S to definitive goals for evaluating system capacity and performance requirements. Specifically the paper will discuss best practices for implementing modeling and simulation into ITIL. These practices hinge on implementing integrated M&S methods that 1) encompass at least two or more predictive modeling techniques, 2) complement each one's respective strengths and weaknesses to support the validation of predicted results, and 3) are tied to the system's performance and workload monitoring efforts. How to structure two forms of modeling: statistical and simUlation in the development of "As Is" and "To Be" efforts will be used to exemplify the integrated M&S methods. The paper will show how these methods can better support the project's overall capacity management efforts.
Cesari, Matteo; Landi, Francesco; Calvani, Riccardo; Cherubini, Antonio; Di Bari, Mauro; Kortebein, Patrick; Del Signore, Susanna; Le Lain, Regis; Vellas, Bruno; Pahor, Marco; Roubenoff, Ronenn; Bernabei, Roberto; Marzetti, Emanuele
2017-02-01
In the present article, the rationale that guided the operationalization of the theoretical concept of physical frailty and sarcopenia (PF&S), the condition of interest for the "Sarcopenia and Physical Frailty in Older People: Multicomponent Treatment Strategies" (SPRINTT) trial, is presented. In particular, the decisions lead to the choice of the adopted instruments, and the reasons for setting the relevant thresholds are explained. In SPRINTT, the concept of physical frailty is translated with a Short Physical Performance Battery score of ≥3 and ≤9. Concurrently, sarcopenia is defined according to the recent definitions of low muscle mass proposed by the Foundation for the National Institutes of Health-Sarcopenia Project. Given the preventive purpose of SPRINTT, older persons with mobility disability (operationalized as incapacity to complete a 400-m walk test within 15 min; primary outcome of the trial) at the baseline are not included within the diagnostic spectrum of PF&S.
ERIC Educational Resources Information Center
Grabowski, Barbara L.; Koszalka, Tiffany A.
Combining assessment and research components on a large development and research project is a complex task. There are many descriptions of how either assessment or research should be conducted, but detailed examples illustrating integration of such strategies in complex projects are scarce. This paper provides definitions of assessment,…
43 CFR 404.7 - What types of projects are eligible for consideration under the program?
Code of Federal Regulations, 2010 CFR
2010-10-01
... BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.7... consideration under the program, a rural water supply project must: (a) Meet the definition of a rural water supply project in § 404.2; and (b) Be located in a Reclamation State, as defined in § 404.2. ...
40 CFR 262.90 - Project XL for Public Utilities in New York State.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Project XL for Public Utilities in New... Utilities § 262.90 Project XL for Public Utilities in New York State. (a) The following definitions apply to..., or any company that provides electric power or telephone service and is regulated by New York State's...
Space Infrared Telescope Facility (SIRTF) science instruments
NASA Technical Reports Server (NTRS)
Ramos, R.; Hing, S. M.; Leidich, C. A.; Fazio, G.; Houck, J. R.
1989-01-01
Concepts of scientific instruments designed to perform infrared astronomical tasks such as imaging, photometry, and spectroscopy are discussed as part of the Space Infrared Telescope Facility (SIRTF) project under definition study at NASA/Ames Research Center. The instruments are: the multiband imaging photometer, the infrared array camera, and the infrared spectograph. SIRTF, a cryogenically cooled infrared telescope in the 1-meter range and wavelengths as short as 2.5 microns carrying multiple instruments with high sensitivity and low background performance, provides the capability to carry out basic astronomical investigations such as deep search for very distant protogalaxies, quasi-stellar objects, and missing mass; infrared emission from galaxies; star formation and the interstellar medium; and the composition and structure of the atmospheres of the outer planets in the solar sytem.
NASA Technical Reports Server (NTRS)
Ferragut, N. J.
1982-01-01
The Shuttle Pointed Autonomous Research Tool for Astronomy (SPARTAN) family of spacecraft are intended to operate with minimum interfaces with the U.S. Space Shuttle in order to increase flight opportunities. The SPARTAN I Spacecraft was designed to enhance structural capabilities and increase reliability. The approach followed results from work experience which evolved from sounding rocket projects. Structural models were developed to do the analyses necessary to satisfy safety requirements for Shuttle hardware. A loads analysis must also be performed. Stress analysis calculations will be performed on the main structural elements and subcomponents. Attention is given to design considerations and program definition, the schematic representation of a finite element model used for SPARTAN I spacecraft, details of loads analysis, the stress analysis, and fracture mechanics plan implications.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Director who is responsible for the scientific and technical direction of the project. (d) Grantee means... Department to whom the authority to issue or modify research project grant instruments has been delegated. (j... experience in particular scientific or technical fields to give expert advice, in accordance with the...
Code of Federal Regulations, 2014 CFR
2014-01-01
... Director who is responsible for the scientific and technical direction of the project. (d) Grantee means... Department to whom the authority to issue or modify research project grant instruments has been delegated. (j... experience in particular scientific or technical fields to give expert advice, in accordance with the...
Code of Federal Regulations, 2013 CFR
2013-01-01
... Director who is responsible for the scientific and technical direction of the project. (d) Grantee means... Department to whom the authority to issue or modify research project grant instruments has been delegated. (j... experience in particular scientific or technical fields to give expert advice, in accordance with the...
Code of Federal Regulations, 2014 CFR
2014-07-01
..., after the structure has been damaged by a flood, hurricane, or coastal storm, to the level of protection... Washington, D.C. Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed... of hurricanes, tsunamis, and coastal storms. These effects are primarily to protect against wave...
ERIC Educational Resources Information Center
Messenger, Chris; Emerson, Jane; Bird, Ronit
2007-01-01
In this article, the authors offer three definitions of dyscalculia, then describe the background and initial progress of the Harrow Dyscalculia Project. Their project in Harrow is associated with ongoing research into numeracy and brain development led by Brian Butterworth, Professor of Cognitive Neuropsychology at UCL. Pupils from Harrow schools…
International Education in Australian Universities: Concepts and Definitions.
ERIC Educational Resources Information Center
Clyne, Fiona; Marginson, Simon; Woock, Roger
This paper grew out of the research study "Mapping the Internationalization of Higher Education," a 1998-2000 Australian Research Council-funded project. The project's objectives included: documenting the practices of international education in Australian universities; analyzing the cultural, political, and economic assumptions on which…
50 CFR 660.11 - General definitions.
Code of Federal Regulations, 2013 CFR
2013-10-01
...-related mortality including landings, discard mortality, research catches, and catches in exempted fishing..., any allocation or projected catch for the Pacific Coast treaty Indian Tribes, projected research catch...) Scientific research activity. (See § 600.10 of this chapter) Secretary. (See § 600.10 of this chapter...
24 CFR 891.655 - Definitions applicable to 202/162 projects.
Code of Federal Regulations, 2012 CFR
2012-04-01
... residing in an intermediate care facility for the mentally retarded that is assisted under Title XIX of the... family residential structure designed or adapted for occupancy by nonelderly handicapped individuals... that are primarily nonelderly handicapped families. Independent living complex means a project designed...
USL/DBMS NASA/PC R and D project system design standards
NASA Technical Reports Server (NTRS)
Dominick, Wayne D. (Editor); Moreau, Dennis R.
1984-01-01
A set of system design standards intended to assure the completeness and quality of designs developed for PC research and development projects is established. The standards presented address the areas of problem definition, initial design plan, design specification, and re-evaluation.
48 Capabilities of Highly Educated People
ERIC Educational Resources Information Center
Greene, Richard Tabor
2008-01-01
Purpose: To get beyond religious, philosophic, and political definitions of educatedness by going empirical. To redo Plato, in effect, by defining "the good" empirically. Background: This research was part of the Excellence Science (orthogonal disciplines) Research Project at the University of Chicago. That project redid Plato by…
Data Requirement (DR) MA-03: Payload missions integration. [Spacelab payloads
NASA Technical Reports Server (NTRS)
1985-01-01
Project management and payload integration requirements definition activities are reported. Mission peculiar equipment; systems integration; ground operations analysis and requirement definition; safety and quality assurance; and support systems development are examined for payloads planned for the following missions: EOM-1; SL-2; Sl-3 Astro-1; MSL-2; EASE/ACCESS; MPESS; and the middeck ADSF flight.
34 CFR 645.6 - What definitions apply to the Upward Bound Program?
Code of Federal Regulations, 2010 CFR
2010-07-01
... individual means an individual whose family taxable income did not exceed 150 percent of the poverty level... definitions also apply to this part: Family taxable income means— (1) With regard to a dependent student, the... project. The poverty level amount is determined by using criteria of poverty established by the Bureau of...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Protection Act may be allowed only if the Director of the Fish and Wildlife Service (1) finds, based on the... Project (Clearance No. 1018-0070), Washington, DC 20503. (c) Definitions. In addition to definitions... the specific geographical region where it will occur; (iii) Based upon the best available scientific...
Identification and Definition of Lexically Ambiguous Words in Statistics by Tutors and Students
ERIC Educational Resources Information Center
Richardson, Alice M.; Dunn, Peter K.; Hutchins, Rene
2013-01-01
Lexical ambiguity arises when a word from everyday English is used differently in a particular discipline, such as statistics. This paper reports on a project that begins by identifying tutors' perceptions of words that are potentially lexically ambiguous to students, in two different ways. Students' definitions of nine lexically ambiguous words…
Verzola, Adriano; Bentivegna, Roberto; Carandina, Gianni; Trevisani, Lucio; Gregorio, Pasquale; Mandini, Alberto
2009-01-01
Background and Aims One of the best-known performance planning and evaluation techniques utilising both monetary and non-monetary data is the Balanced Scorecard (BSC). This is a means of rationalising the global activity of a business in the attempt to create value, and to translate the company vision into a set of tactical objectives and measurable strategies. The aim of this study was to implement and evaluate the use of BSC in two departments of the St. Anna University Hospital, Ferrara: the Analysis Laboratory and Digestive Endoscopy operating units (OU). Materials and methods With the collaboration of the health workers involved, a precise methodological programme was pursued: Definition of the strategic map from 4 perspectives, according to Kaplan and Norton, Definition of the Key Performance Areas (KPA), or macro-objectives, Identification of the cause-effect relationships between KPAs, Identification of the sub-objectives of each KPA, Definition of the Key Performance Indicators (KPI), Definition of the weight/importance of each objective in the global evaluation. Results The information gathered permitted the definition of macro- and sub-objectives for each perspective, as well as determining the relevant indicators, standards, weights, frequency of detection and means of acquisition. Strategic maps showing the cause/effect relationships in each OU were created, as were 'evaluation panels', which describe the global performance of each department. For each perspective, the fundamental data were summarised in one table. Evaluation of each perspective yielded a positive result for the majority of the objectives, and the global result (including all 4 perspectives) was found to be satisfactory. Discussion-Conclusion The Balanced Scorecard was implemented in the abovementioned OUs of St. Anna University Hospital, Ferrara, after the health workers themselves realised the need for change. In our research the employees were pleased to be evaluated, not only for the financial outcomes, but also for the satisfaction of improving internal procedure, relationships with the community and their own growth/learning. BSC is an ideal point of contact between the financial and clinical dimensions of management. However, difficulties in its application were faced, among these, at least in the initial phase, the lack of information systems able to drive it, and the complexity of the research for specific indicators needed to be overcome. The time factor (on average, at least two years are required) and the availability of technological resources were also limiting factors. The rapid diffusion of BSC among the principal international profit and non-profit organisations is testament to its great potential. This project could be seen as a preparatory phase in the strategical analysis of a subsequent business plan. PMID:19737409
Psychophysiological investigations of the biomedical problems of manned spaceflight
NASA Technical Reports Server (NTRS)
1993-01-01
The Final Report on psychophysiological investigations of the biomedical problems of manned spaceflight is presented. In the first project, statistical analyses of human autonomic data were performed. The objectives were the following: to establish a relational data base containing human psychophysiological data obtained from Shuttle flight experiments and ground-based research over a 20 year period; to enable multi-user access and retrieval of these data for subsequent analyses and for possible inclusion in the proposed Life Sciences Data Archive; and to enable/conduct statistical analyses across several experiments on large subject populations which can thereby provide definitive answers to questions on human autonomic and behavioral responses and adaptation to environmental stressors on Earth and in space. The second project studied motion sickness. The objectives were: to test/develop hardware and procedures to be incorporated into preflight training of crewmembers of Spacelab-J; and to examine spin-off applications of AFT. The third project studied orthostatic intolerance. The objective was to test the feasibility of applying autogenic-feedback training as a potential treatment for postflight orthostatic intolerance.
Radiation dose reduction for CT lung cancer screening using ASIR and MBIR: a phantom study.
Mathieu, Kelsey B; Ai, Hua; Fox, Patricia S; Godoy, Myrna Cobos Barco; Munden, Reginald F; de Groot, Patricia M; Pan, Tinsu
2014-03-06
The purpose of this study was to reduce the radiation dosage associated with computed tomography (CT) lung cancer screening while maintaining overall diagnostic image quality and definition of ground-glass opacities (GGOs). A lung screening phantom and a multipurpose chest phantom were used to quantitatively assess the performance of two iterative image reconstruction algorithms (adaptive statistical iterative reconstruction (ASIR) and model-based iterative reconstruction (MBIR)) used in conjunction with reduced tube currents relative to a standard clinical lung cancer screening protocol (51 effective mAs (3.9 mGy) and filtered back-projection (FBP) reconstruction). To further assess the algorithms' performances, qualitative image analysis was conducted (in the form of a reader study) using the multipurpose chest phantom, which was implanted with GGOs of two densities. Our quantitative image analysis indicated that tube current, and thus radiation dose, could be reduced by 40% or 80% from ASIR or MBIR, respectively, compared with conventional FBP, while maintaining similar image noise magnitude and contrast-to-noise ratio. The qualitative portion of our study, which assessed reader preference, yielded similar results, indicating that dose could be reduced by 60% (to 20 effective mAs (1.6 mGy)) with either ASIR or MBIR, while maintaining GGO definition. Additionally, the readers' preferences (as indicated by their ratings) regarding overall image quality were equal or better (for a given dose) when using ASIR or MBIR, compared with FBP. In conclusion, combining ASIR or MBIR with reduced tube current may allow for lower doses while maintaining overall diagnostic image quality, as well as GGO definition, during CT lung cancer screening.
Johansen, Kirsten L; Dalrymple, Lorien S; Glidden, David; Delgado, Cynthia; Kaysen, George A; Grimes, Barbara; Chertow, Glenn M
2016-04-07
Frailty is common among patients on dialysis and increases vulnerability to dependency and death. We examined the predictive ability of frailty on the basis of physical performance and self-reported function in participants of a US Renal Data System special study that enrolled a convenience sample of 771 prevalent patients on hemodialysis from 14 facilities in the Atlanta and northern California areas from 2009 to 2011. Performance-based frailty was assessed using direct measures of grip strength (weakness) and gait speed along with weight loss, exhaustion, and low physical activity; poor self-reported function was substituted for weakness and slow gait speed in the self-reported function-based definition. For both definitions, patients meeting three or more criteria were considered frail. The mean age of 762 patients included in analyses was 57.1±14.2 years old; 240 patients (31%) met the physical performance-based definition of frailty, and 396 (52%) met the self-reported function-based definition. There were 106 deaths during 1.7 (interquartile range, 1.4-2.4) years of follow-up. After adjusting for demographic and clinical characteristics, the hazard ratio (HR) for mortality for the performance-based definition (2.16; 95% confidence interval [95% CI], 1.41 to 3.29) was slightly higher than that of the self-reported function-based definition (HR, 1.93; 95% CI, 1.24 to 3.00). Patients who met the self-report-based definition but not the physical performance definition of frailty (n=192) were not at statistically significantly higher risk of mortality than those who were not frail by either definition (n=330; HR, 1.41; 95% CI, 0.81 to 2.45), but those who met both definitions of frailty (n=204) were at significantly higher risk (HR, 2.46; 95% CI, 1.51 to 4.01). Frailty, defined using either direct tests of physical performance or self-reported physical function, was associated with higher mortality among patients receiving hemodialysis. Future studies are needed to determine the utility of assessing frailty in clinical practice. Copyright © 2016 by the American Society of Nephrology.
Research and Technology: Fiscal year 1982 report
NASA Technical Reports Server (NTRS)
1982-01-01
Accomplishments and research objectives are described in the following areas: (1) space sciences; (2) space and terrestrial applications; (3) flight projects and mission definition studies; (4) space tracking and data systems; and (5) space technology. Data analysis efforts, instrument development, and measurement projects are among the aspects considered.
Streamline Your Project: A Lifecycle Model.
ERIC Educational Resources Information Center
Viren, John
2000-01-01
Discusses one approach to project organization providing a baseline lifecycle model for multimedia/CBT development. This variation of the standard four-phase model of Analysis, Design, Development, and Implementation includes a Pre-Analysis phase, called Definition, and a Post-Implementation phase, known as Maintenance. Each phase is described.…
Code of Federal Regulations, 2014 CFR
2014-10-01
... operated for the purpose of doing research for development of products related to nuclear energy (e) The projects and expenses related to nuclear energy projects have been terminated. No transfer of these...
Code of Federal Regulations, 2013 CFR
2013-10-01
... operated for the purpose of doing research for development of products related to nuclear energy (e) The projects and expenses related to nuclear energy projects have been terminated. No transfer of these...