Sample records for performance management issues

  1. Major Elements and Issues in Performance Management System: A Literature Review

    ERIC Educational Resources Information Center

    Bae, Eul-Kyoo

    2006-01-01

    Due to rapidly changing business environment, HRD practitioners are unprecedentedly demanded to actively participate in improving organizational effectiveness as performance management specialist. The purpose of this study was to examine and discuss major elements and issues in performance management system through an extensive literature review…

  2. DOT's budget : management and performance issues facing the department in fiscal year 1999

    DOT National Transportation Integrated Search

    1998-02-12

    This testimony discusses key resource management issues and performance challenges facing the Department of Transportation in 1999 and beyond. 1. There is a need for increased management attention to highway, transit, and rail programs - which accoun...

  3. DOT's Budget: Safety, Management, and Other Issues Facing the Department in Fiscal Year 1998 and Beyond

    DOT National Transportation Integrated Search

    1997-03-06

    This testimony discusses key resource management issues and performance challenges facing the Department of Transportation in 1998 and beyond. 1. Increased safety and security concerns prompted by accidents and maintenance issues. 2. Important manage...

  4. Development of Performance Dashboards in Healthcare Sector: Key Practical Issues.

    PubMed

    Ghazisaeidi, Marjan; Safdari, Reza; Torabi, Mashallah; Mirzaee, Mahboobeh; Farzi, Jebraeil; Goodini, Azadeh

    2015-10-01

    Static nature of performance reporting systems in health care sector has resulted in inconsistent, incomparable, time consuming, and static performance reports that are not able to transparently reflect a round picture of performance and effectively support healthcare managers' decision makings. So, the healthcare sector needs interactive performance management tools such as performance dashboards to measure, monitor, and manage performance more effectively. The aim of this article was to identify key issues that need to be addressed for developing high-quality performance dashboards in healthcare sector. A literature review was established to search electronic research databases, e-journals collections, and printed journals, books, dissertations, and theses for relevant articles. The search strategy interchangeably used the terms of "dashboard", "performance measurement system", and "executive information system" with the term of "design" combined with operator "AND". Search results (n=250) were adjusted for duplications, screened based on their abstract relevancy and full-text availability (n=147) and then assessed for eligibility (n=40). Eligible articles were included if they had explicitly focused on dashboards, performance measurement systems or executive information systems design. Finally, 28 relevant articles included in the study. Creating high-quality performance dashboards requires addressing both performance measurement and executive information systems design issues. Covering these two fields, identified contents were categorized to four main domains: KPIs development, Data Sources and data generation, Integration of dashboards to source systems, and Information presentation issues. This study implies the main steps to develop dashboards for the purpose of performance management. Performance dashboards developed on performance measurement and executive information systems principles and supported by proper back-end infrastructure will result in creation of dynamic reports that help healthcare managers to consistently measure the performance, continuously detect outliers, deeply analyze causes of poor performance, and effectively plan for the future.

  5. Traffic Management for Satellite-ATM Networks

    NASA Technical Reports Server (NTRS)

    Goyal, Rohit; Jain, Raj; Fahmy, Sonia; Vandalore, Bobby; Goyal, Mukul

    1998-01-01

    Various issues associated with "Traffic Management for Satellite-ATM Networks" are presented in viewgraph form. Specific topics include: 1) Traffic management issues for TCP/IP based data services over satellite-ATM networks; 2) Design issues for TCP/IP over ATM; 3) Optimization of the performance of TCP/IP over ATM for long delay networks; and 4) Evaluation of ATM service categories for TCP/IP traffic.

  6. Private sector data for performance management.

    DOT National Transportation Integrated Search

    2011-07-01

    This report examines and analyzes technical and institutional issues associated with the use of private sector travel time and speed data for public sector performance management. The primary data needs for congestion performance measures are outline...

  7. Relationship between time management in construction industry and project management performance

    NASA Astrophysics Data System (ADS)

    Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin

    2016-08-01

    Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.

  8. 78 FR 36314 - Submission for Review: Application for U.S. Flag Recognition Benefit for Deceased Federal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-17

    ... to Senior Executive Service and Performance Management, Office of Personnel Management, 1900 E Street... Senior Executive Service and Performance Management, Office of Personnel Management, 1900 E Street NW.../her employment under specified circumstances. OPM is issuing guidance and proposed regulations to...

  9. Teacher, Lecturer or Labourer? Performance Management Issues in Education

    ERIC Educational Resources Information Center

    Mather, Kim; Seifert, Roger

    2011-01-01

    Education management has increasingly been dominated by the norms and requirements of general management ideologies that focus on performance controls and target achievements. Under this regime, solving the labour problem--relatively low productivity--has taken precedence over all other forms of management. In pursuit of this objective senior…

  10. Applying Best Business Practices from Corporate Performance Management to DoD

    DTIC Science & Technology

    2013-01-01

    leading or governing large, complex corporations and are experienced in creating reliable solutions to complex management issues guided by best business ...recommendations and effective solutions aimed at improving DoD. Defense Business Board Corporate Performance Management REPORT FY13-03 Task...Group 1 Applying Best Business Practices from Corporate Performance Management to DoD TASK The Deputy Secretary of Defense (DEPSECDEF

  11. Performance Indicators and the Management of Quality in Education.

    ERIC Educational Resources Information Center

    Cuttance, Peter

    Issues that affect the use of performance indicators in managing educational quality are discussed in this paper. Recent changes in public-sector organizational management include the development of strategies for the management of change itself and the changing role of the public sector. A trend within the public sector is an increase in the…

  12. A strategic value management approach for energy and maintenance management in a building

    NASA Astrophysics Data System (ADS)

    Nawi, Mohd Nasrun Mohd; Dahlan, Nofri Yenita; Nadarajan, Santhirasegaran

    2015-05-01

    Fragmentation process is always been highlighted by the stakeholders in the construction industry as one of the `critical' issue that diminishing the opportunity for stakeholders that involved during the operation and maintenance stage to influence design decisions. Failure of design professionals to consider how a maintenance contractor or facility manager will construct the design thus results in higher operating cost, wastage, defects during the maintenance and operation process. Moving towards team integration is considered a significant strategy for overcoming the issue. Value Management is a style of management dedicated to guiding people and promoting innovation with the aim to improve overall building performance through structured, team-oriented exercises which make explicit, and appraise subsequent decisions, by reference to the value requirements of the clients. Accordingly, this paper discusses the fragmentation issue in more detail including the definition, causes and effects to the maintenance and operation of building and at the same time will highlighted the potential of VM integrated team approach as a strategic management approach for overcoming that issue. It also explores that the team integration strategy alleviates scheduling problems, delays and disputes during the construction process, and, hence, prevent harming the overall building performance.

  13. Performance Management as a Means of Teacher Evaluation: A South Australian Perspective

    ERIC Educational Resources Information Center

    Naidu, Sham

    2011-01-01

    The introduction of performance management in South Australian public schools raises a number of issues regarding the structure, purpose and control of the process itself and the consequences of teacher evaluation. Performance management has the potential to shape teaching and the culture of schools according to what it values and what it ignores.…

  14. Development of Performance Dashboards in Healthcare Sector: Key Practical Issues

    PubMed Central

    Ghazisaeidi, Marjan; Safdari, Reza; Torabi, Mashallah; Mirzaee, Mahboobeh; Farzi, Jebraeil; Goodini, Azadeh

    2015-01-01

    Background: Static nature of performance reporting systems in health care sector has resulted in inconsistent, incomparable, time consuming, and static performance reports that are not able to transparently reflect a round picture of performance and effectively support healthcare managers’ decision makings. So, the healthcare sector needs interactive performance management tools such as performance dashboards to measure, monitor, and manage performance more effectively. The aim of this article was to identify key issues that need to be addressed for developing high-quality performance dashboards in healthcare sector. Methods: A literature review was established to search electronic research databases, e-journals collections, and printed journals, books, dissertations, and theses for relevant articles. The search strategy interchangeably used the terms of “dashboard”, “performance measurement system”, and “executive information system” with the term of “design” combined with operator “AND”. Search results (n=250) were adjusted for duplications, screened based on their abstract relevancy and full-text availability (n=147) and then assessed for eligibility (n=40). Eligible articles were included if they had explicitly focused on dashboards, performance measurement systems or executive information systems design. Finally, 28 relevant articles included in the study. Results: Creating high-quality performance dashboards requires addressing both performance measurement and executive information systems design issues. Covering these two fields, identified contents were categorized to four main domains: KPIs development, Data Sources and data generation, Integration of dashboards to source systems, and Information presentation issues. Conclusion: This study implies the main steps to develop dashboards for the purpose of performance management. Performance dashboards developed on performance measurement and executive information systems principles and supported by proper back-end infrastructure will result in creation of dynamic reports that help healthcare managers to consistently measure the performance, continuously detect outliers, deeply analyze causes of poor performance, and effectively plan for the future. PMID:26635442

  15. The occupational safety and health scorecard--a business case example for strategic management.

    PubMed

    Köper, Birgit; Möller, Klaus; Zwetsloot, Gerard

    2009-12-01

    Human resources and health issues are crucial in terms of corporate competitiveness. However, systematic, continuous and strategically aligned occupational safety and health (OSH) management is scarcely applied in companies. One major reason for this could be the lack of generally accepted and standardised OSH control methods. Our objective was thus to conceptualize a method by which qualitative factors such as human resources and OSH aspects contribute to the performance or value-added layer of an organization. We developed a business case based on the well-known and accepted Balanced Scorecard approach, which we adapted and applied to the management of OSH issues. The concept was implemented in the course of a comprehensive case study at a German automobile manufacturer. We gathered health as well as finance data in order to test which health-related indicators had an impact on financial performance. The demonstration of, and reporting on, how the promotion of workplace health contributes strategically to the organization is crucial for both health and human resource managers. Based on multivariate regression analyses, our main finding was that the Balanced Scorecard approach is an adequate means to control OSH issues in terms of strategic health management. Our analyses demonstrated that health-related interventions contribute significantly to performance aspects such as quality, productivity, absenteeism, and cost reduction. Therefore, the financial impact of health-related aspects / interventions could be demonstrated by means of the OSH scorecard. The availability and quality of health data within the context of overall corporate performance data needs to be improved in order to bridge OSH-related and performance issues of an organization.

  16. Importance x dissatisfaction = a formula for managerial action.

    PubMed

    Carson, Kerry D; Carson, Paula Phillips; Fontenot, Gwen; Toma, Alfred G

    2005-01-01

    Management should not only survey employees about their satisfaction with an issue but should also inquire about how important that issue is to them. If the issue is very important to employees and they are very dissatisfied, then management action may be urgent. However, if staff members are dissatisfied with an issue that is unimportant to them, then no management action may be required. Rank ordering the items by importance and then subtracting satisfaction from importance to get a performance-gap score is insufficient. The decision maker still may have to use intuition to determine which items have priority. Rather than gap analysis, it is better to multiply the importance score by the dissatisfaction score. This will yield a clear rank order of the issues to which the management must attend. The authors used the multiplicative method with a health care organization. These results are analyzed, and management actions are recommended.

  17. The Exposure Index: Developing firefighter safety performance measures

    Treesearch

    Dave Calkin; John Phipps; Tom Holmes; Jon Rieck; Matt Thompson

    2011-01-01

    A cornerstone of effective institutional learning and accountability is the development, tracking, and analysis of informative performance measures. In a previous issue of Fire Management Today ("A New Look at Risk Management," Winter 2011), a series of articles highlighted the importance of organizational safety and risk management and the challenges of...

  18. Methodological Issues in the Study of Air Force Organizational Structures,

    DTIC Science & Technology

    MOTIVATION, MORALE, PERFORMANCE(HUMAN), LEADERSHIP , SKILLS, MANAGEMENT PLANNING AND CONTROL, MODEL THEORY , SYMPOSIA...RESOURCE MANAGEMENT , *HUMAN RESOURCES, *MANPOWER UTILIZATION, *JOB ANALYSIS, *ORGANIZATIONS, STRUCTURES, PERSONNEL MANAGEMENT , DECISION MAKING

  19. Managerial Performance Issues. Symposium 24. [AHRD Conference, 2001].

    ERIC Educational Resources Information Center

    2001

    This document contains three papers on managerial performance issues. "Managerial Skill Requirements: Evidence from the Scottish Visitor Attraction Industry" (Sandra Watson, Martin McCracken) presents the findings from an exploratory study of those skills that managers in the Scottish visitor attraction sector considered most important…

  20. Indicator-based systems of performance management in the National Health Service: a comparison of the perceptions of local- and national-level managers.

    PubMed

    Jones, G T

    2000-02-01

    Historically, the UK Government has policed the use of National Health Service (NHS) resources through the centralization of control. With the majority of resource-draining decisions being taken by clinicians, however, professional financial accountability is becoming more important within the NHS management structure. Variations in clinical performance can be monitored through the use of performance indicators, although these are not without their problems. The use of league tables of such indicators in the national press is now infamous and there is much anecdotal evidence about the intraorganizational conflict arising from the use of such tables. A questionnaire survey and interview study of clinical directors, clinical service directors and business managers in several Scottish NHS Trusts was undertaken to ascertain the perceptions of local-level managers on the issue of performance indicators. Interviews were also carried out with a number of personnel in the Scottish Office Department of Economics and Information, the Division of Health Gain and the Finance Directorate. This paper explores the differences between the perceptions of the managers at these two levels of the NHS with regards to issues of performance measurement, intraorganizational conflict and corporate vision.

  1. Essays on the Effect of Radio Frequency Identification (RFID) on the Management of Healthcare Supply Chain Performance

    ERIC Educational Resources Information Center

    Cakici, Ozden Engin

    2012-01-01

    This dissertation examines three issues on the effect of Radio Frequency Identification (RFID) on the management of healthcare supply chain performance within the context of inventory management. Motivated by a case study conducted in a radiology practice, the second chapter analyzes the incremental benefits of RFID over barcodes for managing…

  2. Management of ATM-based networks supporting multimedia medical information systems

    NASA Astrophysics Data System (ADS)

    Whitman, Robert A.; Blaine, G. James; Fritz, Kevin; Goodgold, Ken; Heisinger, Patrick

    1997-05-01

    Medical information systems are acquiring the ability to collect and deliver many different types of medical information. In support of the increased network demands necessitated by these expanded capabilities, asynchronous transfer mode (ATM) based networks are being deployed in medical care systems. While ATM supplies a much greater line rate than currently deployed networks, the management and standards surrounding ATM are yet to mature. This paper explores the management and control issues surrounding an ATM network supporting medical information systems, and examines how management impacts network performance and robustness. A multivendor ATM network at the BJC Health System/Washington University and the applications using the network are discussed. Performance information for specific applications is presented and analyzed. Network management's influence on application reliability is outlined. The information collected is used to show how ATM network standards and management tools influence network reliability and performance. Performance of current applications using the ATM network is discussed. Special attention is given to issues encountered in implementation of hypertext transfer protocol over ATM internet protocol (IP) communications. A classical IP ATM implementation yields greater than twenty percent higher network performance over LANE. Maximum performance for a host's suite of applications can be obtained by establishing multiple individually engineered IP links through its ATM network connection.

  3. Performance issues in management of the Space Station Information System

    NASA Technical Reports Server (NTRS)

    Johnson, Marjory J.

    1988-01-01

    The onboard segment of the Space Station Information System (SSIS), called the Data Management System (DMS), will consist of a Fiber Distributed Data Interface (FDDI) token-ring network. The performance of the DMS in scenarios involving two kinds of network management is analyzed. In the first scenario, how the transmission of routine management messages impacts performance of the DMS is examined. In the second scenario, techniques for ensuring low latency of real-time control messages in an emergency are examined.

  4. Conflict Management.

    ERIC Educational Resources Information Center

    Fisher, William; Koue, Glen

    1991-01-01

    Discusses general issues involved in conflict management and provides more specific examples of conflict management in libraries. Causes of conflict are considered, including organizational structure, departmentalization, performance appraisal, poor communication, and technological change; and methods of dealing with conflict are described,…

  5. Job Management Requirements for NAS Parallel Systems and Clusters

    NASA Technical Reports Server (NTRS)

    Saphir, William; Tanner, Leigh Ann; Traversat, Bernard

    1995-01-01

    A job management system is a critical component of a production supercomputing environment, permitting oversubscribed resources to be shared fairly and efficiently. Job management systems that were originally designed for traditional vector supercomputers are not appropriate for the distributed-memory parallel supercomputers that are becoming increasingly important in the high performance computing industry. Newer job management systems offer new functionality but do not solve fundamental problems. We address some of the main issues in resource allocation and job scheduling we have encountered on two parallel computers - a 160-node IBM SP2 and a cluster of 20 high performance workstations located at the Numerical Aerodynamic Simulation facility. We describe the requirements for resource allocation and job management that are necessary to provide a production supercomputing environment on these machines, prioritizing according to difficulty and importance, and advocating a return to fundamental issues.

  6. Preferences of Training Performance Measurement: A Comparative Study of Training Professionals and Non-Training Managers

    ERIC Educational Resources Information Center

    Chapman, Diane D.

    2004-01-01

    This survey-based study addressed a perceived gap between training performance evaluation practice and decision-making criteria required in business. Training professionals and non-training managers in North Carolina were surveyed. The study found that the groups differ in the performance measures that motivate them to act on training issues.…

  7. The Chief Performance Officer in Education. Solutions. Issue No. 3

    ERIC Educational Resources Information Center

    Nafziger, Dean

    2013-01-01

    A performance management system can help the state education agency (SEA) become more intentional about what it does and does not do, how work is done, and when to change course. Performance management does not define goals or identify specific strategies, but it puts in place systems that enable learning and adaptation to drive improvement and…

  8. 78 FR 19691 - Defense Business Board; Notice of Federal Advisory Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-02

    ... draft recommendations from the ``Applying Best Business Practices for Corporate Performance Management...: ``Applying Best Business Practices for Corporate Performance Management to DoD,'' ``Major Business Issues for... Group Study and ``Using Best Practices to Achieve More Effective Participation by Industry'' Task Group...

  9. 78 FR 68027 - Membership of the Bureau of Industry and Security Performance Review Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-13

    ...: Ruthie B. Stewart, Department of Commerce, Office of Human Resources Management, Office of Executive..., Director, Office of Staffing, Recruitment and Classification, Department of Commerce Human Resources... the appointing authority on other performance management issues, such as pay adjustments, bonuses and...

  10. Outage management and health physics issue, 2007

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Agnihotri, Newal

    2007-05-15

    The focus of the May-June issue is on outage management and health physics. Major articles/reports in this issue include: India: a potential commercial opportunity, a U.S. Department of Commerce Report, by Joe Neuhoff and Justin Rathke; The changing climate for nuclear energy, by Skip Bowman, Nuclear Energy Insitute; Selecting protective clothing, by J. Mark Price, Southern California Edison; and Succssful refurbishment outage, by Sudesh K. Gambhir, Omaha Public Power District. Industry innovation articles in this issue are: Containment radiation monitoring spiking, by Michael W. Lantz and Robert Routolo, Arizona Public Service Company; Improved outage performance, by Michael Powell and Troymore » Wilfong, Arizona Public Service Company, Palo Verde Nuclear Generating Station; Stop repacking valves and achieve leak-free performance, by Kenneth Hart, PPL Susquehanna LLC; and Head assembly upgrade package, by Timothy Petit, Dominion Nuclear.« less

  11. The strategic skills of business continuity managers: putting business continuity management into corporate long-term planning.

    PubMed

    Wong, Wei Ning Zechariah

    2009-11-01

    Despite its rapid development in the last two decades, business continuity management (BCM) as a discipline and a profession is still regarded by many as an operational entity of management. Two main issues are discussed in this paper: the role of BCM in strategic management and the strategic skills of business continuity managers. These issues are crucial as they represent the role of BCM in high-level corporate management. The paper discusses the importance of BCM in the long-term planning of organisational success and the preservation of future competitiveness. Finally, salient points that underpin the importance of its role in sustaining organisational performance are addressed.

  12. Blended near-optimal tools for flexible water resources decision making

    NASA Astrophysics Data System (ADS)

    Rosenberg, David

    2015-04-01

    State-of-the-art systems analysis techniques focus on efficiently finding optimal solutions. Yet an optimal solution is optimal only for the static modelled issues and managers often seek near-optimal alternatives that address un-modelled or changing objectives, preferences, limits, uncertainties, and other issues. Early on, Modelling to Generate Alternatives (MGA) formalized near-optimal as performance within a tolerable deviation from the optimal objective function value and identified a few maximally-different alternatives that addressed select un-modelled issues. This paper presents new stratified, Monte Carlo Markov Chain sampling and parallel coordinate plotting tools that generate and communicate the structure and full extent of the near-optimal region to an optimization problem. Plot controls allow users to interactively explore region features of most interest. Controls also streamline the process to elicit un-modelled issues and update the model formulation in response to elicited issues. Use for a single-objective water quality management problem at Echo Reservoir, Utah identifies numerous and flexible practices to reduce the phosphorus load to the reservoir and maintain close-to-optimal performance. Compared to MGA, the new blended tools generate more numerous alternatives faster, more fully show the near-optimal region, help elicit a larger set of un-modelled issues, and offer managers greater flexibility to cope in a changing world.

  13. Health assessments for Indigenous Australians at Orange Aboriginal Medical Service: health problems identified and subsequent follow up.

    PubMed

    Dutton, Tegan; Stevens, Wendy; Newman, Jamie

    2016-01-01

    This study aimed to document the types, management and follow up of health issues identified by all Aboriginal Health Assessments (AHA) performed at Orange Aboriginal Medical Service from 1 January 2011 to 31 December 2012. This was done with a retrospective audit of clinical records. In total, 1169 AHAs were performed: 41% child, 53% adult and 6% older person AHAs. Newly identified health issues were documented in 85% (984). Being overweight (41%; 476) and smoking (26%; 301) were the common risk factors identified. As a result of the AHA, most children who were not up-to-date with their vaccinations received catch-up immunisations; 11% (36) of adult women (n=314) received a Pap smear, although Pap smear status was unknown or not up-to-date for 61% (192); 27% (311) of cases were prescribed new medication; and 1239 referrals were made but only 40% were attended. At 6 months following the AHA, 26% (240) of cases with newly identified health issues were completely managed and followed up, whereas 25% (226) received no follow up. The AHAs are useful for identifying new health issues; however, follow up of the identified health issues should be improved. If AHAs are to improve health outcomes, appropriate management and follow up of the identified health issues are essential.

  14. Equipment Management Manual

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The NASA Equipment Management Manual (NHB 4200.1) is issued pursuant to Section 203(c)(1) of the National Aeronautics and Space Act of 1958, as amended (42 USC 2473), and sets forth policy, uniform performance standards, and procedural guidance to NASA personnel for the acquisition, management, and use of NASA-owned equipment. This revision is effective upon receipt. This is a controlled manual, issued in loose-leaf form, and revised through page changes. Additional copies for internal use may be obtained through normal distribution.

  15. Six steps to an effective denials management program.

    PubMed

    Robertson, Brian; Doré, Alexander

    2005-09-01

    The following six steps can help you manage denials management issues in your organization: Create standard definitions of denial types. Establish a denial hierarchy. Establish a centralized denial database. Develop key performance indicators. Build responsibility matrices. Measure, monitor, and take action.

  16. Tank waste remediation system nuclear criticality safety program management review

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BRADY RAAP, M.C.

    1999-06-24

    This document provides the results of an internal management review of the Tank Waste Remediation System (TWRS) criticality safety program, performed in advance of the DOE/RL assessment for closure of the TWRS Nuclear Criticality Safety Issue, March 1994. Resolution of the safety issue was identified as Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-40-12, due September 1999.

  17. Strategies to improve the performance of learners in a nursing college. Part II: Issues pertaining to management, attitudes and values.

    PubMed

    Waterson, E; Harms, E; Qupe, L; Maritz, J; Manning, M; Makobe, K; Chabeli, M

    2006-05-01

    This article forms part two of a bigger study that was conducted in a nursing college to explore and describe the reasons for the poor performance of learners. Part one of the study dealt with the issues pertaining to education, while this article (part two) seeks to describe issues pertaining to management, attitudes and values that lead to the poor performance of learners in the nursing college under study. A qualitative, exploratory and descriptive design that was contextual in nature was employed, and three focus groups interviews were conducted. Seven tutors formed one group while other two groups were formed by fourth-year learners following a comprehensive diploma course. All participants voluntarily participated in the study. Data was analyzed using the descriptive method of open coding in accordance with Tesch's protocol (in Creswell, 1994:154-156). Trustworthiness was ensured using the following principles: credibility, conformability, transferability and dependability (Lincoln & Guba 1985:290-326). Findings were categorized into issues pertaining to management, attitudes and values that had an influence on the poor performance of learners as follows: Inadequate resources and study facilities; policies that change frequently; tutors' dissatisfaction with regard to staff development, the lack of involvement by management and lack of management support, staff shortage and maldistribution of staff members; ineffective selection process of learners; inconsistent regulations, and too many of them; policies and procedures resulting in confusion and poor discipline. Attitudes and values: Tutors' lack of motivation and interest, lack of respect by learners and no team work among tutors. Through a conceptualization process and the recommendations by participants, strategies to improve the learners' performance were described. It is recommended that these strategies be submitted to the staff development committee for implementation and future follow-up research be undertaken to determine the effectiveness of the strategies. It is also recommended that other nursing colleges replicate the study within their context.

  18. 16 CFR 1000.19 - Office of Financial Management, Planning and Evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...; analysis of major policy and operational issues; performing evaluations and management studies of... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Office of Financial Management, Planning and... COMMISSION ORGANIZATION AND FUNCTIONS § 1000.19 Office of Financial Management, Planning and Evaluation. The...

  19. What ethics for case managers? Literature review and discussion.

    PubMed

    Corvol, Aline; Moutel, Grégoire; Somme, Dominique

    2016-11-01

    Little is known about case managers' ethical issues and professional values. This article presents an overview of ethical issues in case managers' current practice. Findings are examined in the light of nursing ethics, social work ethics and principle-based biomedical ethics. A systematic literature review was performed to identify and analyse empirical studies concerning ethical issues in case management programmes. It was completed by systematic content analysis of case managers' national codes of ethics. Only nine empirical studies were identified, eight of them from North America. The main dilemmas were how to balance system goals against the client's interest and client protection against autonomy. Professional codes of ethics shared important similarities, but offered different responses to these two dilemmas. We discuss the respective roles of professional and organizational ethics. Further lines of research are suggested. © The Author(s) 2015.

  20. Thoughts on Beijing's Long-Term Rural Infrastructure Management and Protection Issues from the Perspective of the Government to Effectively Perform Their Duties

    NASA Astrophysics Data System (ADS)

    Wang, Z.

    To strengthen rural infrastructure management, give full play to the role of benefit of infrastructure, it has important significance for promoting the development of rural economy and society. Protection-use and facility energy-use issues are outstanding during Beijing rural infrastructure management. The comprehensive and detailed analysis of the cause of the problems put forward the concrete feasible countermeasures from the government to fulfill the effective function to rural infrastructure: A clear property ownership; Implementation of special funds audit system of the rural infrastructure management; Implementation of rural infrastructure maintenance and management assessment methods and so on.

  1. An Ounce of Prevention: The Benefits of an HR Audit

    ERIC Educational Resources Information Center

    Seals, Brenda

    2011-01-01

    During her 13 years leading a school district human resources office, the author came to recognize that managing human capital is much more than recruiting, hiring, managing personnel records, and handling performance issues. In addition to implementing initiatives to increase the efficiency with which HR officers and staff perform those tasks,…

  2. Department of Education: Long-Standing Management Problems Hamper Reforms. Report to the Secretary of Education.

    ERIC Educational Resources Information Center

    General Accounting Office, Washington, DC. Div. of Human Resources.

    This general management review (one in a series of management reviews of federal departments and agencies) identifies key management issues facing the U.S. Department of Education. This review assesses the management of the department and identifies actions that can be taken to improve organizational performance. Data were derived from 151…

  3. Developing the Skills for International Business Management: The Implications of the Management Education Opportunity Grid

    ERIC Educational Resources Information Center

    Yu, Chwo-Ming Joseph; Guan, Jyh-Liang; Yang, Kuo-Pin; Chiao, Yu-Ching

    2005-01-01

    This exploratory study addresses two issues: (1) how firms select applicants for positions in international management and, subsequently, evaluate the performance of international business education in Taiwan; and (2) what the important skills for international management professionals are, and how well university graduates are equipped with these…

  4. An examination on the influence of small and medium enterprise (SME) stakeholder on green supply chain management practices

    NASA Astrophysics Data System (ADS)

    Shahlan, M. Z.; Sidek, A. A.; Suffian, S. A.; Hazza, M. H. F. A.; Daud, M. R. C.

    2018-01-01

    In this paper, climate change and global warming are the biggest current issues in the industrial sectors. The green supply chain managements (GSCM) is one of the crucial input to these issues. Effective GSCM can potentially secure the organization’s competitive advantage and improve the environmental performance of the network activities. In this study, the aim is to investigate and examine how a small and medium enterprises (SMEs) stakeholder pressure and top management influence green supply chain management practices. The study is further advance green supply chain management research in Malaysia focusing on SMEs manufacturing sector using structural equation modelling. Structural equation modelling is a multivariate statistical analysis technique used to examine structural relationship. It is the combination of factor analysis and multi regression analysis and used to analyse structural relationship between measure variable and latent factor. This research found that top management support and stakeholder pressure is the major influence for SMEs to adopt green supply chain management. The research also found that top management is fully mediate with the relationship between stakeholder pressure and monitoring supplier environmental performance.

  5. Empirical Analysis of Green Supply Chain Management Practices in Indian Automobile Industry

    NASA Astrophysics Data System (ADS)

    Luthra, S.; Garg, D.; Haleem, A.

    2014-04-01

    Environmental sustainability and green environmental issues have an increasing popularity among researchers and supply chain practitioners. An attempt has been made to identify and empirically analyze green supply chain management (GSCM) practices in Indian automobile industry. Six main GSCM practices (having 37 sub practices) and four expected performance outcomes (having 16 performances) have been identified by implementing GSCM practices from literature review. Questionnaire based survey has been made to validate these practices and performance outcomes. 123 complete questionnaires were collected from Indian automobile organizations and used for empirical analysis of GSCM practices in Indian automobile industry. Descriptive statistics have been used to know current implementation status of GSCM practices in Indian automobile industry and multiple regression analysis has been carried out to know the impact on expected organizational performance outcomes by current GSCM practices adopted by Indian automobile industry. The results of study suggested that environmental, economic, social and operational performances improve with the implementation of GSCM practices. This paper may play an important role to understand various GSCM implementation issues and help practicing managers to improve their performances in the supply chain.

  6. Improving performance through an organizational culture of employee expertise.

    PubMed

    Jacobs, R L

    1996-01-01

    Managers can do many things to improve organizational performance, but the accomplishments of the most skillful employees often are most important. This article makes the point that managers should be aware of employee expertise and its relationship to organizational performance. The article also describes the components of an organizational culture of employee expertise. An organizational culture of employee expertise builds on the learning organization metaphor that has frequently appeared in the management literature. How employees develop expertise to do their jobs is emerging as a critical issue for organizations, and managers will likely play a key role in that process.

  7. Materials inventory management manual

    NASA Technical Reports Server (NTRS)

    1992-01-01

    This NASA Materials Inventory Management Manual (NHB 4100.1) is issued pursuant to Section 203(c)(1) of the National Aeronautics and Space Act of 1958 (42 USC 2473). It sets forth policy, performance standards, and procedures governing the acquisition, management and use of materials. This Manual is effective upon receipt.

  8. ERCMExpress. Volume 2, Issue 2

    ERIC Educational Resources Information Center

    US Department of Education, 2006

    2006-01-01

    This issue of the Emergency Response and Crisis Management (ERCM) Technical Assistance Center's "ERCMExpress" introduces the National Clearinghouse for Educational Facilities (NCEF), a free public service that provides information on planning, designing, funding, building, improving and maintaining safe, healthy, high-performance schools. NCEF is…

  9. 5 CFR 432.103 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... performance above “unacceptable” in the critical element(s) at issue. (b) Critical element means a work... to the work. (h) Unacceptable performance means performance of an employee that fails to meet... Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERFORMANCE BASED REDUCTION IN...

  10. Framing the Dialogue: Strategies, Issues and Opportunities

    DTIC Science & Technology

    1993-05-01

    issue is the relationship between the declining Federal financing of public works and the Federal interest in providing infrastructure services. Large...programs and projects are significant. lmprove Infrastructure Managmnt : Management improvements closely parallel the issues associated with strategic... Relationship Between Examination of the linkage between standards GKY & Standards & and the delivery of goods and services from Associates Performance

  11. The Strategic Management of Human Capital: Issues and Ideas

    ERIC Educational Resources Information Center

    Berry, Barnett

    2008-01-01

    Most recently a number of school districts, with support from growing numbers of philanthropic foundations, have been honing in on the strategic management of human capital(SMHC)--which has been defined as "the acquisition, development, performance management and retention of top talent." Granted, over the last two decades policymakers and…

  12. Not Too Hot, Not Too Cold - Continuum Magazine | NREL

    Science.gov Websites

    management technologies increase vehicle energy efficiency and performance while reducing costs. Mythological automobiles. Issues with thermal management cause some of these limitations. A photo of a white disk submerged sector petroleum consumption. Manufacturers and operators alike are looking to new thermal management

  13. Integrated Social and Quality of Service Trust Management of Mobile Groups in Ad Hoc Networks

    DTIC Science & Technology

    2013-01-01

    high resiliency to malicious attacks and misbehaving nodes. Keywords—trust management; mobile ad hoc networks; QoS trust; social trust; trust...paper we address an importance issue of trust management protocol design for MANETs: trust bias minimization despite misbehaving nodes performing

  14. Using SCOR as a Supply Chain Management Framework for Government Agency Contract Requirements

    NASA Technical Reports Server (NTRS)

    Paxton, Joe

    2010-01-01

    Enterprise Supply Chain Management consists of: Specifying suppliers to support inter-program and inter-agency efforts. Optimizing inventory levels and locations throughout the supply chain. Executing corrective actions to improve quality and lead time issues throughout the supply chain. Processing reported data to calculate and make visible supply chain performance (provide information for decisions and actions). Ensuring the right hardware and information is provided at the right time and in the right place. Monitoring the industrial base while developing, producing, operating and retiring a system. Seeing performance deep in the supply chain that could indicate issues affecting system availability and readiness.

  15. Evaluation, Language, and Untranslatables

    ERIC Educational Resources Information Center

    Dahler-Larsen, Peter; Abma, Tineke; Bustelo, María; Irimia, Roxana; Kosunen, Sonja; Kravchuk, Iryna; Minina, Elena; Segerholm, Christina; Shiroma, Eneida; Stame, Nicoletta; Tshali, Charlie Kabanga

    2017-01-01

    The issue of translatability is pressing in international evaluation, in global transfer of evaluative instruments, in comparative performance management, and in culturally responsive evaluation. Terms that are never fully understood, digested, or accepted may continue to influence issues, problems, and social interactions in and around and after…

  16. Women with Multiple Sclerosis and Employment Issues: A Focus on Social and Institutional Environment.

    ERIC Educational Resources Information Center

    Dyck, Isabel; Jongbloed, Lyn

    2000-01-01

    Examines employment issues for women with multiple sclerosis. Focuses on experiences of women managing their disability and demonstrates the importance of the social and institutional dimensions of environment in shaping occupational performance. (Contains 27 references.) (JOW)

  17. A Map for Clinical Laboratories Management Indicators in the Intelligent Dashboard.

    PubMed

    Azadmanjir, Zahra; Torabi, Mashallah; Safdari, Reza; Bayat, Maryam; Golmahi, Fatemeh

    2015-08-01

    management challenges of clinical laboratories are more complicated for educational hospital clinical laboratories. Managers can use tools of business intelligence (BI), such as information dashboards that provide the possibility of intelligent decision-making and problem solving about increasing income, reducing spending, utilization management and even improving quality. Critical phase of dashboard design is setting indicators and modeling causal relations between them. The paper describes the process of creating a map for laboratory dashboard. the study is one part of an action research that begins from 2012 by innovation initiative for implementing laboratory intelligent dashboard. Laboratories management problems were determined in educational hospitals by the brainstorming sessions. Then, with regard to the problems key performance indicators (KPIs) specified. the map of indicators designed in form of three layered. They have a causal relationship so that issues measured in the subsequent layers affect issues measured in the prime layers. the proposed indicator map can be the base of performance monitoring. However, these indicators can be modified to improve during iterations of dashboard designing process.

  18. Organisational performance and business continuity management: a theoretical perspective and a case study.

    PubMed

    Sawalha, Ihab Hanna Salman

    2013-01-01

    This paper seeks to extend the research relating to the strategic view of business continuity management (BCM) to the context of organisational performance (OP). It discusses potential performance consequences resulting from applying BCM aspects/elements within an organisation. The paper contributes to the understanding of the role of BCM in OP by discussing how deployment of BCM key aspects/elements can improve OP. Two main issues are discussed: first, background to performance and the elements of OP; and secondly, the role of BCM in achieving optimised OP. These issues are significant, as they go further than the extant literature relating to the significance of BCM and its potential influence on OP. The study focuses on Jordanian banks as a case study and as a way of illustrating how BCM helps improve OP for those organisations facing performance shortcomings or difficulties.

  19. Strategic Issues for Training.

    ERIC Educational Resources Information Center

    Pollitt, David, Ed.

    1998-01-01

    Includes 21 short articles on a variety of subjects: Internet for management development, lifelong learning in virtual universities, high performance organizations, National Vocational Qualifications, cost effectiveness and training effectiveness, mind maps, Generation X training, Japanese vocational training, management development in Libya, and…

  20. 42 CFR 460.62 - Governing body.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Management and provision of all services, including the management of contractors. (4) Establishment of... participants. (7) Quality assessment and performance improvement program. (b) Participant advisory committee... provide the liaison to the governing body with meeting minutes that include participant issues. (c...

  1. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1990-01-01

    This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

  2. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1991-01-01

    This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

  3. The Effects of Teaching and Assessment Methods on Academic Performance: A Study of an Operations Management Course

    ERIC Educational Resources Information Center

    Sacristán-Díaz, Macarena; Garrido-Vega, Pedro; Alfalla-Luque, Rafaela; González-Zamora, María-del-Mar

    2016-01-01

    Whether the use of more active teaching-learning methods has a positive impact on academic performance remains unanswered. This article seeks to contribute to the issue by conducting a study of an Operations Management course with almost 1000 students per year over three consecutive academic years. The study compares three scenarios with differing…

  4. Getting a handle on DNFB strategies for boosting performance.

    PubMed

    2015-03-01

    Keeping tabs on DNFB requires a commitment from multiple departments, including clinical documentation, health information management, utilization management, and patient financial services. Monitoring DNFB performance daily, weekly, and monthly can help an organization quickly resolve short-term problems and also identify and respond to more systemic issues. By leveraging historical and comparison data, including performance information from peer organizations, hospitals and health systems can set more realistic targets and further highlight improvement opportunities.

  5. Project Management, Critical Praxis, and Process-Oriented Approach to Teamwork

    ERIC Educational Resources Information Center

    Ding, Huiling; Ding, Xin

    2008-01-01

    To help alleviate issues of free-riding and conflicts in team projects, this study proposes the systematic incorporation of project management methods to introduce a process-oriented approach to and a critical praxis in team projects. We examined how the systematic use of project management methods influenced students' performance in team…

  6. Data Management for Effective Condition Assessment of Collection Systems

    EPA Science Inventory

    Condition assessment provides critical information for assessment of an asset’s physical condition, remaining useful service life, and long-term performance. This paper will describe data management issues integral to a successful condition assessment program. Key points will b...

  7. Transition of occupational health issues associated with stabilization and decommissioning of the nuclear reactors in the Fukushima Daiichi Nuclear Power Plant through 2013.

    PubMed

    Mori, Koji; Tateishi, Seiichiro; Kubo, Tatsuhiko; Okazaki, Ryuji; Suzuki, Katsunori; Kobayashi, Yuichi; Hiraoka, Koh; Hayashi, Takeshi; Takeda, Masaru; Kiyomoto, Yoshifumi; Kawashita, Futoshi; Yoshikawa, Toru; Sakai, Kazuhiro

    2014-11-01

    To clarify the occupational health (OH) issues that arose, what actions were taken, and the OH performances during the disaster involving the Fukushima Daiichi Nuclear Power Plant and thus improve the OH management system with respect to long-term decommissioning work and preparation for future disasters. We used information in advisory reports to the Tokyo Electric Power Company by an OH expert group, observation through support activities, and data officially released by the Tokyo Electric Power Company. Occupational health issues transitioned as work progressed and seasons changed. They were categorized into OH management system establishment, radiation exposure control, heat illness prevention, infectious disease prevention and control, and fitness for workers' duties. Occupational health management systems involving OH experts should be implemented to manage multiple health risks with several conflicts and trade-offs after a disaster.

  8. Identification and Characterization of Key Human Performance Issues and Research in the Next Generation Air Transportation System (NextGen)

    NASA Technical Reports Server (NTRS)

    Lee, Paul U.; Sheridan, Tom; Poage, james L.; Martin, Lynne Hazel; Jobe, Kimberly K.

    2010-01-01

    This report identifies key human-performance-related issues associated with Next Generation Air Transportation System (NextGen) research in the NASA NextGen-Airspace Project. Four Research Focus Areas (RFAs) in the NextGen-Airspace Project - namely Separation Assurance (SA), Airspace Super Density Operations (ASDO), Traffic Flow Management (TFM), and Dynamic Airspace Configuration (DAC) - were examined closely. In the course of the research, it was determined that the identified human performance issues needed to be analyzed in the context of NextGen operations rather than through basic human factors research. The main gaps in human factors research in NextGen were found in the need for accurate identification of key human-systems related issues within the context of specific NextGen concepts and better design of the operational requirements for those concepts. By focusing on human-system related issues for individual concepts, key human performance issues for the four RFAs were identified and described in this report. In addition, mixed equipage airspace with components of two RFAs were characterized to illustrate potential human performance issues that arise from the integration of multiple concepts.

  9. Library of Michigan: Financial Management Reference Guide.

    ERIC Educational Resources Information Center

    Michigan Library, Lansing.

    Developed to provide library directors, staff, and board members with information for performing accounting and financial management functions, this guide answers frequently asked questions, describes common practices and processes, provides examples and suggested formats for selected financial reports, and identifies issues that may require…

  10. CCTV Data Management for Effective Condition Assessment of Wastewater Collection Systems

    EPA Science Inventory

    Condition assessment provides critical information for determining an asset’s physical condition, remaining useful service life, and long-term performance. Data management issues integral to a successful condition assessment program are described in this paper. Key points are i...

  11. Policy Issues in the Administration of Higher Education in Nigeria

    ERIC Educational Resources Information Center

    Ogbogu, Christiana O.

    2013-01-01

    This paper evaluates policy initiatives in the Nigerian higher educational system with a view to bringing it in line with good practices. Issues of gender, management/governance, teaching, research and funding were discussed. The study revealed that government's funding is insufficient to maintain institutional performance because of the policy…

  12. Systems Engineering and Integration for Advanced Life Support System and HST

    NASA Technical Reports Server (NTRS)

    Kamarani, Ali K.

    2005-01-01

    Systems engineering (SE) discipline has revolutionized the way engineers and managers think about solving issues related to design of complex systems: With continued development of state-of-the-art technologies, systems are becoming more complex and therefore, a systematic approach is essential to control and manage their integrated design and development. This complexity is driven from integration issues. In this case, subsystems must interact with one another in order to achieve integration objectives, and also achieve the overall system's required performance. Systems engineering process addresses these issues at multiple levels. It is a technology and management process dedicated to controlling all aspects of system life cycle to assure integration at all levels. The Advanced Integration Matrix (AIM) project serves as the systems engineering and integration function for the Human Support Technology (HST) program. AIM provides means for integrated test facilities and personnel for performance trade studies, analyses, integrated models, test results, and validated requirements of the integration of HST. The goal of AIM is to address systems-level integration issues for exploration missions. It will use an incremental systems integration approach to yield technologies, baselines for further development, and possible breakthrough concepts in the areas of technological and organizational interfaces, total information flow, system wide controls, technical synergism, mission operations protocols and procedures, and human-machine interfaces.

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunn, Darrell; Poinssot, Christophe; Begg, Bruce

    Management of nuclear waste remains an important international topic that includes reprocessing of commercial nuclear fuel, waste-form design and development, storage and disposal packaging, the process of repository site selection, system design, and performance assessment. Requirements to manage and dispose of materials from the production of nuclear weapons, and the renewed interest in nuclear power, in particular through the Generation IV Forum and the Advanced Fuel Cycle Initiative, can be expected to increase the need for scientific advances in waste management. A broad range of scientific and engineering disciplines is necessary to provide safe and effective solutions and address complexmore » issues. This volume offers an interdisciplinary perspective on materials-related issues associated with nuclear waste management programs. Invited and contributed papers cover a wide range of topics including studies on: spent fuel; performance assessment and models; waste forms for low- and intermediate-level waste; ceramic and glass waste forms for plutonium and high-level waste; radionuclides; containers and engineered barriers; disposal environments and site characteristics; and partitioning and transmutation.« less

  14. How management teams can have a good fight.

    PubMed

    Eisenhardt, K M; Kahwajy, J L; Bourgeois, L J

    1997-01-01

    Top-level managers know that conflict over issues is natural and even necessary. Management teams that challenge one another's thinking develop a more complete understanding of their choices, create a richer range of options, and make better decisions. But the challenge--familiar to anyone who has ever been part of a management team--is to keep constructive conflict over issues from degenerating into interpersonal conflict. From their research on the interplay of conflict, politics, and speed in the decision--making process of management teams, the authors have distilled a set of six tactics characteristic of high-performing teams: They work with more, rather than less, information. They develop multiple alternatives to enrich debate. The establish common goals. They make an effort to inject humor into the workplace. They maintain a balanced corporate power structure. They resolve issues without forcing a consensus. These tactics work because they keep conflict focused on issues; foster collaborative, rather than competitive, relations among team members; and create a sense of fairness in the decision-making process. Without conflict, groups lose their effectiveness. Managers often become withdrawn and only superficially harmonious. The alternative to conflict is not usually agreement but rather apathy and disengagement, which open the doors to a primary cause of major corporate debacles: groupthink.

  15. Informal Mentoring

    ERIC Educational Resources Information Center

    Weber, Daniel

    2017-01-01

    A best practice regarding annual employee performance evaluations is that there should be no surprises. Issues regarding a person's performance should be addressed as they occur throughout the year. This has been the approach of the author when evaluating staff performance. However, this practice did not prepare the author to manage his surprise…

  16. Equipment management user's handbook for property custodians

    NASA Technical Reports Server (NTRS)

    1993-01-01

    The NASA Equipment Management User's Handbook for Property Custodians is issued as an instructional guide for personnel designated as property custodians and technical personnel involved in the acquisition, management, and use of NASA-owned equipment. This handbook provides general information and basic operational procedures for processing equipment transactions through the agency-wide NASA Equipment Management System (NEMS). Each NASA installation must prepare supplementary instructions for local requirements beyond the scope of NASA-wide policies and procedures contained herein, or as specified for local implementation in NHB 4200.1, 'NASA Equipment Management Manual.' NHB 4200.1 sets forth policy, uniform performance standards, and procedural guidance to NASA personnel for the acquisition, management, and use of NASA-owned equipment. This handbook is a controlled document, issued in loose-leaf form and revised by page changes. Additional copies for internal use may be obtained through normal distribution.

  17. A Map for Clinical Laboratories Management Indicators in the Intelligent Dashboard

    PubMed Central

    Azadmanjir, Zahra; Torabi, Mashallah; Safdari, Reza; Bayat, Maryam; Golmahi, Fatemeh

    2015-01-01

    Introduction: management challenges of clinical laboratories are more complicated for educational hospital clinical laboratories. Managers can use tools of business intelligence (BI), such as information dashboards that provide the possibility of intelligent decision-making and problem solving about increasing income, reducing spending, utilization management and even improving quality. Critical phase of dashboard design is setting indicators and modeling causal relations between them. The paper describes the process of creating a map for laboratory dashboard. Methods: the study is one part of an action research that begins from 2012 by innovation initiative for implementing laboratory intelligent dashboard. Laboratories management problems were determined in educational hospitals by the brainstorming sessions. Then, with regard to the problems key performance indicators (KPIs) specified. Results: the map of indicators designed in form of three layered. They have a causal relationship so that issues measured in the subsequent layers affect issues measured in the prime layers. Conclusion: the proposed indicator map can be the base of performance monitoring. However, these indicators can be modified to improve during iterations of dashboard designing process. PMID:26483593

  18. Improving Voluntary Environmental Management Programs: Facilitating Learning and Adaptation

    NASA Astrophysics Data System (ADS)

    Genskow, Kenneth D.; Wood, Danielle M.

    2011-05-01

    Environmental planners and managers face unique challenges understanding and documenting the effectiveness of programs that rely on voluntary actions by private landowners. Programs, such as those aimed at reducing nonpoint source pollution or improving habitat, intend to reach those goals by persuading landowners to adopt behaviors and management practices consistent with environmental restoration and protection. Our purpose with this paper is to identify barriers for improving voluntary environmental management programs and ways to overcome them. We first draw upon insights regarding data, learning, and adaptation from the adaptive management and performance management literatures, describing three key issues: overcoming information constraints, structural limitations, and organizational culture. Although these lessons are applicable to a variety of voluntary environmental management programs, we then present the issues in the context of on-going research for nonpoint source water quality pollution. We end the discussion by highlighting important elements for advancing voluntary program efforts.

  19. Human rights and implications for managers.

    PubMed

    Bunner, K L

    1994-01-01

    Although the Canadian Human Rights Act was enacted in 1977 and The Charter of Rights and Freedoms was introduced in 1981, a paucity of Canadian literature regarding their implications for nursing managers is apparent. The modern nursing unit manager is faced with a variety of decisions pertaining to employment, performance evaluations, and delegation of responsibilities, which if not sensitively and fairly handled may expose the manager and the organization to non-defensible vulnerabilities. This paper briefly reviews pertinent human rights issues in the nursing setting and the effect of human rights considerations on the management of a nursing unit. Discrimination, harassment, the hiring process, performance appraisal and discipline are discussed along with recommendations regarding mandatory inservices for managers.

  20. Laboratory challenges conducting international clinical research in resource-limited settings.

    PubMed

    Fitzgibbon, Joseph E; Wallis, Carole L

    2014-01-01

    There are many challenges to performing clinical research in resource-limited settings. Here, we discuss several of the most common laboratory issues that must be addressed. These include issues relating to organization and personnel, laboratory facilities and equipment, standard operating procedures, external quality assurance, shipping, laboratory capacity, and data management. Although much progress has been made, innovative ways of addressing some of these issues are still very much needed.

  1. Performance Management in Healthcare Organizations: Concept and Practicum.

    PubMed

    Dimitropoulos, Panagiotis E

    2017-01-01

    Organizational performance can create and sustain competitive advantages for corporations and even improve their sustainability and future prospects. Health care organizations present a sector where performance management is structured by multiple dimensions. The scope of this study is to analyze the issue of performance management in healthcare organizations and specifically the implementation of the Balanced Scorecard (BSC) methodology on organizations providing health services. The study provides a discussion on the BSC development process, the steps that management has to take in order to prepare the implementation of the BSC and finally discusses a practical example of a scorecard with specific strategic goals and performance indicators. Managers of healthcare organizations and specifically those providing services to the elderly and the general population could use the propositions of the study as a roadmap for processing, analyzing, evaluating and implementing the balanced scorecard approach in their organizations' daily operations. BSC methodology can give an advantage in terms of enhanced stakeholder management and preservation within a highly volatile and competitive economic environment.

  2. Flight Crew Survey Responses from the Interval Management (IM) Avionics Phase 2 Flight Test

    NASA Technical Reports Server (NTRS)

    Baxley, Brian T.; Swieringa, Kurt A.; Wilson, Sara R.; Roper, Roy D.; Hubbs, Clay E.; Goess, Paul A.; Shay, Richard F.

    2017-01-01

    The Interval Management (IM) Avionics Phase 2 flight test used three aircraft over a nineteen day period to operationally evaluate a prototype IM avionics. Quantitative data were collected on aircraft state data and IM spacing algorithm performance, and qualitative data were collected through end-of-scenario and end-of-day flight crew surveys. The majority of the IM operations met the performance goals established for spacing accuracy at the Achieve-by Point and the Planned Termination Point, however there were operations that did not meet goals for a variety of reasons. While the positive spacing accuracy results demonstrate the prototype IM avionics can contribute to the overall air traffic goal, critical issues were also identified that need to be addressed to enhance IM performance. The first category was those issues that impacted the conduct and results of the flight test, but are not part of the IM concept or procedures. These included the design of arrival and approach procedures was not ideal to support speed as the primary control mechanism, the ground-side of the Air Traffic Management Technology Demonstration (ATD-1) integrated concept of operations was not part of the flight test, and the high workload to manually enter the information required to conduct an IM operation. The second category was issues associated with the IM spacing algorithm or flight crew procedures. These issues include the high frequency of IM speed changes and reversals (accelerations), a mismatch between the deceleration rate used by the spacing algorithm and the actual aircraft performance, and some spacing error calculations were sensitive to normal operational variations in aircraft airspeed or altitude which triggered additional IM speed changes. Once the issues in these two categories are addressed, the future IM avionics should have considerable promise supporting the goals of improving system throughput and aircraft efficiency.

  3. 30 CFR 227.102 - What royalty management functions will MMS not delegate?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... payments shown on royalty reports or other documents, such as bills, to reconcile payor accounts. MMS also... actions other than issuing demands, subpoenas and orders to perform restructured accounting. MMS or the appropriate Federal agency will issue notices of non-compliance and civil penalties, collect debts, write off...

  4. Providers' Perspectives on Case Management of a Healthy Start Program: A Qualitative Study

    PubMed Central

    Moise, Imelda K.; Mulhall, Peter F.

    2016-01-01

    Although Healthy Start case managers recognized the benefits of case management for facilitating optimal service delivery to women and their families, structural factors impact effective implementation. This study investigated case managers' views of 1) the structural challenges faced in implementing case management for program participants, and 2) possible strategies to enhance case management in medical home settings. Two focus groups were conducted separately with case managers from the four program service sites to gain insight into these issues noted above. Each group was co-facilitated by two evaluators using a previously developed semi-structured interview guide. The group discussions were audio recorded and the case managers' comments were transcribed verbatim. Transcripts were analyzed using thematic analysis, a deductive approach. Data were collected in 2013 and analyzed in 2015. Case managers are challenged by externalities (demographic shifts in target populations, poverty); contractual requirements (predefined catchment neighborhoods, caseload); limited support (client incentives, tailored training, and a high staff turnover rate); and logistic difficulties (organizational issues). Their approach to case management tends to be focused on linking Although Healthy Start case managers recognized the benefits of case management for facilitating optimal service delivery to women and their families, structural factors impact effective implementation. This study investigated case managers' views of 1) the structural challenges faced in implementing case management for program participants, and 2) possible strategies to enhance case management in medical home settings. Two focus groups were conducted separately with case managers from the four program service sites to gain insight into these issues noted above. Each group was co-facilitated by two evaluators using a previously developed semi-structured interview guide. The group discussions were audio recorded and the case managers' comments were transcribed verbatim. Transcripts were analyzed using thematic analysis, a deductive approach. Data were collected in 2013 and analyzed in 2015. Case managers are challenged by externalities (demographic shifts in target populations, poverty); contractual requirements (predefined catchment neighborhoods, caseload); limited support (client incentives, tailored training, and a high staff turnover rate); and logistic difficulties (organizational issues). Their approach to case management tends to be focused on linking clients to adequate services rather than reporting performance. Case managers favored measurable deliverables rather than operational work products. A proposed solution to current challenges emphasizes and encourages the iterative learning process and shared decision making between program targets, funders and providers. Case managers are aware of the challenging environment in which they operate for their clients and for themselves. However, future interventions will require clearly identified performance measures and increased systems support. PMID:27149061

  5. ASK Magazine. No. 12

    NASA Technical Reports Server (NTRS)

    Laufer, Alexander (Editor); Post, Todd (Editor); Brady, Jody Lannen (Editor)

    2003-01-01

    Welcome to the Academy of Program and Project Leadership (APPL) and ASK Magazine. APPL helps NASA managers and project teams accomplish today's missions and meet tomorrow's challenges by providing performance enhancement services and tools, supporting career development programs, sponsoring knowledge sharing events and publications, and creating opportunities for project management collaboration with universities, professional associations, industry partners and other government agencies. ASK Magazine grew out of APPL's Knowledge Sharing Initiative. The stories that appear in ASK are written by the 'best of the best' project managers, primarily from NASA, but also from other government agencies and industry. These stories contain genuine nuggets of knowledge and wisdom that are transferable across projects. Who better than a project manager to help another project manager address a critical issue on a project? Big projects, smaLl projects-they're ali here in ASK. Stories in this issue include: Earthly Considerations on Mars, Getting Politically Active, Stumping for the Project, Grins & Giggles: The Launch Pad to High Performance, Transfer Wisdom Workshops: Coming to a NASA Center Near You, Project Management: The Television Show, Lessons Learned Again and Again and Again, Implementation Reviews, ASK Talks with Dr. Michael Hecht, and What Is This Fourth Dimension?.

  6. Shoulder dystocia: management and documentation.

    PubMed

    Stitely, Michael L; Gherman, Robert B

    2014-06-01

    Shoulder dystocia is an obstetric emergency that occurs when the fetal shoulders become impacted at the pelvic inlet. Management is based on performing maneuvers to alleviate this impaction. A number of protocols and training mnemonics have been developed to assist in managing shoulder dystocia when it occurs. This article reviews the evidence regarding the performance, timing, and sequence of these maneuvers; reviews the mechanism of fetal injury in relation to shoulder dystocia; and discusses issues concerning documentation of the care provided during this obstetric emergency. Copyright © 2014 Elsevier Inc. All rights reserved.

  7. A failure management prototype: DR/Rx

    NASA Technical Reports Server (NTRS)

    Hammen, David G.; Baker, Carolyn G.; Kelly, Christine M.; Marsh, Christopher A.

    1991-01-01

    This failure management prototype performs failure diagnosis and recovery management of hierarchical, distributed systems. The prototype, which evolved from a series of previous prototypes following a spiral model for development, focuses on two functions: (1) the diagnostic reasoner (DR) performs integrated failure diagnosis in distributed systems; and (2) the recovery expert (Rx) develops plans to recover from the failure. Issues related to expert system prototype design and the previous history of this prototype are discussed. The architecture of the current prototype is described in terms of the knowledge representation and functionality of its components.

  8. Management in Training

    ERIC Educational Resources Information Center

    Babick, Christine

    2009-01-01

    Advancement offices have their share of management issues. Do any of these situations sound familiar? An underachieving alumni director should have been let go long ago, but without a single bad performance review, he can't be fired. A development officer hires the wrong person and now spends too much time supervising her. A high-performing…

  9. The Case for Creative Abrasion: Experts Speak Out on Knowledge Management.

    ERIC Educational Resources Information Center

    Cowley-Durst, Barbara; Christensen, Hal D.; Degler, Duane; Weidner, Douglas; Feldstein, Michael

    2001-01-01

    Five knowledge management (KM) experts discuss answers to six fundamental issues of KM that address: a definition of knowledge and KM; relationship between business and KM; whether technology has helped the knowledge worker; relationship between learning, performance, knowledge, and community; the promise of knowledge ecology or ecosystem and…

  10. NASA Audit Follow-up Handbook

    NASA Technical Reports Server (NTRS)

    1990-01-01

    This NASA Audit Follow-up Handbook is issued pursuant to the requirements of the Office of Management and Budget (OMB) Circular A-50, Audit Follow-up, dated September 29, 1982. It sets forth policy, uniform performance standards, and procedural guidance to NASA personnel for use when considering reports issued by the Office of Inspector General (OIG), other executive branch audit organizations, the Defense Contract Audit Agency (DCAA), and the General Accounting Office (GAO). It is intended to: specify principal roles; strengthen the procedures for management decisions (resolution) on audit findings and corrective action on audit report recommendations; emphasize the importance of monitoring agreed upon corrective actions to assure actual accomplishment; and foster the use of audit reports as effective tools of management. A flow chart depicting the NASA audit and management decision process is in Appendix A. This handbook is a controlled handbook issued in loose-leaf form and will be revised by page changes. Additional copies for internal use may be obtained through normal distribution channels.

  11. FY 2013 INL SITE SUSTAINABILITY PLAN WITH THE FY 2012 ANNUAL REPORT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ernest L. Fossum; Steve A. Birrer

    2012-12-01

    It is the policy of the Department of Energy (DOE) that sustainable energy and transportation fuels management will be integrated into DOE operations to meet obligations under Executive Order (EO) 13423 "Strengthening Federal Environmental, Energy, and Transportation Management," the Instructions for Implementation of EO 13423, as well as Guidance Documents issued in accordance thereto and any modifcations or amendments that may be issued from time to time. In furtherance of this obligation, DOE established strategic performance-based energy and transportation fuels goals and strategies through the Transformational Energy Action Management (TEAM) Initiative, which were incorporated into DOE Order 430.2B "Departmental Energy,more » Renewable energy, and Transportation Management" and were also identified in DOE Order 450.1A, "Environmental Protection Program." These goals and accompanying strategies are to be implemented by DOE sites through the integration of energy and transportation fuels management into site Environmental Management Systems (EMS).« less

  12. Disaster Risk Management and Measurement Indicators for Cultural Heritage in Taiwan

    NASA Astrophysics Data System (ADS)

    Yen, Y. N.; Cheng, C. F.; Cheng, H. M.

    2015-08-01

    Under the influence of global climate change, the risk preparedness has become a universal issue in different research fields. In the conservation of cultural heritage, disaster risk management is becoming one of the major research topics. Besides researches on the theory and mechanism of disaster risk management, the tools for the performance of site managers to protect cultural heritage is another important issue that needs development. UNESCO and ICOMOS have released some important documents on disaster risk management including its concept, identification, evaluation, mitigation, monitoring and resilience, etc. However, there is a big gap between concept and implementation in Taiwan. Presently there are 2000 monuments in Taiwan that hardly meet the modern code. First, based on international documents released, this research presents 13 disaster indicators on monuments and their environments. Next, 345 monuments in northern Taiwan are taken as examples to evaluate their risk situations with indicators designed in 2011. Some positive recommendations were given at the same time. As a result, a comparative evaluation was completed in 2012 and some key issues are found, such as too many electrical facilities, lack of efficient firefighting equipment, and a shortage of management mechanism, just to name a few. Through the improvement of the management, some major risk can be mitigated. In 2013~14, this research took 23 national monuments from the 345 monuments to evaluate their risk situations and compare the differences between national and local monuments. Results show that almost all management mechanisms in the national monuments have been established and are running well. However, problems like inappropriate electrical facilities and insufficient monitoring equipment remain. In addition, the performance of private monuments is not as good as public ones. Based on the collected information and evaluation, this research develops safety measures of heritage conservation in two aspects. One is for researchers to measure the risk of the heritage; the other is for site managers to manage the risk of their monument with ease. In conclusion, intendants of monuments in Taiwan have to develop more disaster risk management ideas to mitigate and prevent risks. In the meantime, the management and monitoring mechanisms available are helpful tools for risk mitigation. The awareness and training of the site managers are important issues for the implementation of risk prevention.

  13. 78 FR 79697 - Statement of Organization, Functions, and Delegations of Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-31

    ... new initiatives based on emerging issues, science, and policy; (6) supports the harmonization and..., and programmatic efforts; (10) manages evaluation fellowship; (11) guides performance-based strategic... improvement based on effective program evaluation, and performance measurement; (14) supports evidence-driven...

  14. Major Management Challenges and Program Risks. Department of State

    DTIC Science & Technology

    2001-01-01

    Major Management Challenges and Program Risks Department of StateGAO-01-252 Form SF298 Citation Data Report Date ("DD MON YYYY") 00JAN2001 Report...Type N/A Dates Covered (from... to) ("DD MON YYYY") Title and Subtitle Major Management Challenges and Program Risks Department of State Contract or...special series, first issued in January 1999, entitled the Performance and Accountability Series: Major Management Challenges and Program Risks . In

  15. Major Management Challenges and Program Risks. Department of the Interior

    DTIC Science & Technology

    2001-01-01

    Major Management Challenges and Program Risks Department of the InteriorGAO-01-249 Report Date ("DD MON YYYY") 00JAN2001 Report Type N/A Dates...Covered (from... to) ("DD MON YYYY") Title and Subtitle Major Management Challenges and Program Risks Department of the Interior Contract or Grant...first issued in January 1999, entitled the Performance and Accountability Series: Major Management Challenges and Program Risks . In that series, GAO

  16. Branch target buffer design and optimization

    NASA Technical Reports Server (NTRS)

    Perleberg, Chris H.; Smith, Alan J.

    1993-01-01

    Consideration is given to two major issues in the design of branch target buffers (BTBs), with the goal of achieving maximum performance for a given number of bits allocated to the BTB design. The first issue is BTB management; the second is what information to keep in the BTB. A number of solutions to these problems are reviewed, and various optimizations in the design of BTBs are discussed. Design target miss ratios for BTBs are developed, making it possible to estimate the performance of BTBs for real workloads.

  17. Theory underlying CRM training: Psychological issues in flight crew performance and crew coordination

    NASA Technical Reports Server (NTRS)

    Helmreich, Robert L.

    1987-01-01

    What psychological theory and research can reveal about training in Cockpit Resource Management (CRM) is summarized. A framework is provided for the critical analysis of current approaches to CRM training. Background factors and definitions critical to evaluating CRM are reviewed, followed by a discussion of issues directly related to CRM training effectiveness. Some of the things not known about the optimization of crew performance and the research needed to make these efforts as effective as possible are described.

  18. Measurement error in performance studies of health information technology: lessons from the management literature.

    PubMed

    Litwin, A S; Avgar, A C; Pronovost, P J

    2012-01-01

    Just as researchers and clinicians struggle to pin down the benefits attendant to health information technology (IT), management scholars have long labored to identify the performance effects arising from new technologies and from other organizational innovations, namely the reorganization of work and the devolution of decision-making authority. This paper applies lessons from that literature to theorize the likely sources of measurement error that yield the weak statistical relationship between measures of health IT and various performance outcomes. In so doing, it complements the evaluation literature's more conceptual examination of health IT's limited performance impact. The paper focuses on seven issues, in particular, that likely bias downward the estimated performance effects of health IT. They are 1.) negative self-selection, 2.) omitted or unobserved variables, 3.) mis-measured contextual variables, 4.) mismeasured health IT variables, 5.) lack of attention to the specific stage of the adoption-to-use continuum being examined, 6.) too short of a time horizon, and 7.) inappropriate units-of-analysis. The authors offer ways to counter these challenges. Looking forward more broadly, they suggest that researchers take an organizationally-grounded approach that privileges internal validity over generalizability. This focus on statistical and empirical issues in health IT-performance studies should be complemented by a focus on theoretical issues, in particular, the ways that health IT creates value and apportions it to various stakeholders.

  19. 21st Century Educators: Developing and Supporting Great Career and Technical Education Teachers. Special Issues Brief. Revised Edition

    ERIC Educational Resources Information Center

    Jacques, Catherine; Potemski, Amy

    2014-01-01

    This Special Issues Brief from the Center on Great Teachers and Leaders (GTL Center) offers insight into three human capital management policies that are critical for career and technical education (CTE) teachers: certification, performance evaluation, and professional development. CTE teachers are uniquely positioned to improve college and career…

  20. Vision for a treasured resource. Part 2. Nurse manager learning needs.

    PubMed

    Horvath, K J; Aroian, J F; Secatore, J A; Alpert, H; Costa, M J; Powers, E; Stengrevics, S S

    1997-04-01

    Part 1 in this two-part series focused on the meaning of significant incidents in nurse managers' practice related to role implementation. Explanation of the authors' application of the Manager as Developer Model (MADM) as a useful model for organizing and understanding some of the data was also discussed. Part 2 describes significant incidents in nurse managers' practice related to their ongoing learning needs. The authors address issues of performance counseling and intervention versus coaching and make recommendations for management development programs.

  1. Communicating Truthfully and Positively in Appraising Work Performance.

    ERIC Educational Resources Information Center

    Pearce, C. Glenn; And Others

    1989-01-01

    Explores the issue of acceptable behavior for managers when giving feedback to their subordinates. Notes that feedback can be either truthful or untruthful, and can be communicated either positively or negatively. Describes the advantages and disadvantages for each feedback approach to work performance. (MM)

  2. Determinants of individual and group performance

    NASA Technical Reports Server (NTRS)

    Helmreich, Robert L.

    1986-01-01

    A broad exploration of individual and group/organizational factors that influence performance in demanding environments such as space and air transport was undertaken. Primary efforts were directed toward defining critical issues, developing new methodologies for the assessment of performance in such environments, and developing new measures of personality and attitudes as predictors of performance. Substantial clarification of relevant issues for research and validation was achieved. A reliable instrument to assess crewmembers' attitudes regarding crew coordination and flightdeck management was validated. Major efforts in data collection to validate concepts were initiated. The results suggest that substantial improvements can be made in the prediction of performance and in the selection of crewmembers for aviation and space.

  3. Clinical experience with a high-performance ATM-connected DICOM archive for cardiology

    NASA Astrophysics Data System (ADS)

    Solomon, Harry P.

    1997-05-01

    A system to archive large image sets, such as cardiac cine runs, with near realtime response must address several functional and performance issues, including efficient use of a high performance network connection with standard protocols, an architecture which effectively integrates both short- and long-term mass storage devices, and a flexible data management policy which allows optimization of image distribution and retrieval strategies based on modality and site-specific operational use. Clinical experience with such as archive has allowed evaluation of these systems issues and refinement of a traffic model for cardiac angiography.

  4. SU-E-T-11: A Cloud Based CT and LINAC QA Data Management System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wiersma, R; Grelewicz, Z; Belcher, A

    Purpose: The current status quo of QA data management consists of a mixture of paper-based forms and spreadsheets for recording the results of daily, monthly, and yearly QA tests for both CT scanners and LINACs. Unfortunately, such systems suffer from a host of problems as, (1) records can be easily lost or destroyed, (2) data is difficult to access — one must physically hunt down records, (3) poor or no means of historical data analysis, and (4) no remote monitoring of machine performance off-site. To address these issues, a cloud based QA data management system was developed and implemented. Methods:more » A responsive tablet interface that optimizes clinic workflow with an easy-to-navigate interface accessible from any web browser was implemented in HTML/javascript/CSS to allow user mobility when entering QA data. Automated image QA was performed using a phantom QA kit developed in Python that is applicable to any phantom and is currently being used with the Gammex ACR, Las Vegas, Leeds, and Catphan phantoms for performing automated CT, MV, kV, and CBCT QAs, respectively. A Python based resource management system was used to distribute and manage intensive CPU tasks such as QA phantom image analysis or LaTeX-to-PDF QA report generation to independent process threads or different servers such that website performance is not affected. Results: To date the cloud QA system has performed approximately 185 QA procedures. Approximately 200 QA parameters are being actively tracked by the system on a monthly basis. Electronic access to historical QA parameter information was successful in proactively identifying a Linac CBCT scanner’s performance degradation. Conclusion: A fully comprehensive cloud based QA data management system was successfully implemented for the first time. Potential machine performance issues were proactively identified that would have been otherwise missed by a paper or spreadsheet based QA system.« less

  5. Qualitative study of views and experiences of performance management for healthcare-associated infections.

    PubMed

    Brewster, L; Tarrant, C; Dixon-Woods, M

    2016-09-01

    Centrally led performance management regimes using standard setting, monitoring, and incentives have become a prominent feature of infection prevention and control (IPC) in health systems. To characterize views and experiences of regulation and performance management relating to IPC in English hospitals. Two qualitative datasets containing 139 interviews with healthcare workers and managers were analysed. Data directly relevant to performance management and IPC were extracted. Data analysis was based on the constant comparative method. Participants reported that performance management regimes had mobilized action around specific infections. The benefits of establishing organizational structures of accountability were seen in empirical evidence of decreasing infection rates. Performance management was not, however, experienced as wholly benign, and setting targets in one area was seen to involve risks of 'tunnel vision' and the marginalization of other potentially important issues. Financial sanctions were viewed especially negatively; performance management was associated with risks of creating a culture of fearfulness, suppressing learning and disrupting inter-professional relationships. Centrally led performance management may have some important roles in IPC, but identifying where it is appropriate and determining its limits is critical. Persisting with harsh regimes may affect relationships and increase resistance to continued improvement efforts, but leaving all improvement to local teams may also be a flawed strategy. Copyright © 2016 The Authors. Published by Elsevier Ltd.. All rights reserved.

  6. The Influence of Management on the Cost of Fire Protection

    ERIC Educational Resources Information Center

    Donahue, Amy K.

    2004-01-01

    An important and unresolved issue central to the study of government performance is how the actions of managers and the nature of organizations affect the cost of public services. This paper presents an empirical analysis of fire departments that estimates the influence of managerial choices on per capita spending within a simultaneous public…

  7. 13 CFR 130.430 - Application decisions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Agreement. Upon approval or conditional approval, the Grants Management specialist may issue a Cooperative... ability to contribute Matching Funds; (2) For renewal Proposals, the quality of prior performance; (3) The...

  8. Assessments of managed care organizations in the Greater Baton Rouge area by physicians and physicians' office managers.

    PubMed

    Cassidy, W M; Dyson, T; Grenier, C E

    2001-03-01

    Health care quality assessment under managed care organizations is usually derived from two sources: (1) consumer satisfaction surveys, and (2) The Health Plan Employer Data Information Set reports. There is little published data regarding physicians' critiques. This study surveyed physicians and office managers as to the quality of healthcare under 10 managed care organizations in the Greater Baton Rouge area. Performance indicators in the physician questionnaire focused on personal satisfaction, perception of patient satisfaction, and mental health coverage. The office managers' checklist included payment and certification issues, telephone time spent gaining certification, level of knowledge among plan enrollees of their benefits, appeal process, and adequacy of reimbursement. Means were calculated for each performance indicator and managed care organizations were ranked. Tukey-Kramer's post-hoc multiple comparisons test was used to confirm rank order validity. Significant differences were found among companies. Significant rank-order agreement by both physicians and office managers was evident. The usefulness of such surveys and performing them annually is discussed.

  9. Adaptive capacity and community-based natural resource management.

    PubMed

    Armitage, Derek

    2005-06-01

    Why do some community-based natural resource management strategies perform better than others? Commons theorists have approached this question by developing institutional design principles to address collective choice situations, while other analysts have critiqued the underlying assumptions of community-based resource management. However, efforts to enhance community-based natural resource management performance also require an analysis of exogenous and endogenous variables that influence how social actors not only act collectively but do so in ways that respond to changing circumstances, foster learning, and build capacity for management adaptation. Drawing on examples from northern Canada and Southeast Asia, this article examines the relationship among adaptive capacity, community-based resource management performance, and the socio-institutional determinants of collective action, such as technical, financial, and legal constraints, and complex issues of politics, scale, knowledge, community and culture. An emphasis on adaptive capacity responds to a conceptual weakness in community-based natural resource management and highlights an emerging research and policy discourse that builds upon static design principles and the contested concepts in current management practice.

  10. Blended near-optimal alternative generation, visualization, and interaction for water resources decision making

    NASA Astrophysics Data System (ADS)

    Rosenberg, David E.

    2015-04-01

    State-of-the-art systems analysis techniques focus on efficiently finding optimal solutions. Yet an optimal solution is optimal only for the modeled issues and managers often seek near-optimal alternatives that address unmodeled objectives, preferences, limits, uncertainties, and other issues. Early on, Modeling to Generate Alternatives (MGA) formalized near-optimal as performance within a tolerable deviation from the optimal objective function value and identified a few maximally different alternatives that addressed some unmodeled issues. This paper presents new stratified, Monte-Carlo Markov Chain sampling and parallel coordinate plotting tools that generate and communicate the structure and extent of the near-optimal region to an optimization problem. Interactive plot controls allow users to explore region features of most interest. Controls also streamline the process to elicit unmodeled issues and update the model formulation in response to elicited issues. Use for an example, single-objective, linear water quality management problem at Echo Reservoir, Utah, identifies numerous and flexible practices to reduce the phosphorus load to the reservoir and maintain close-to-optimal performance. Flexibility is upheld by further interactive alternative generation, transforming the formulation into a multiobjective problem, and relaxing the tolerance parameter to expand the near-optimal region. Compared to MGA, the new blended tools generate more numerous alternatives faster, more fully show the near-optimal region, and help elicit a larger set of unmodeled issues.

  11. Defense AT and L Magazine. Vol. 46, no. 4, July-August 2017

    DTIC Science & Technology

    2017-07-01

    engineering. He also is a certified Project Manage - ment Professional. Supply Chain Management SCM has become a vital tool used in today’s global economy to...modifying the project management dashboards originally developed by one of the authors, described in “Leveraging Fidelity of Performance­Based Metric...Tools for Project Man­ agement,” an article in the January­February 2003 issue of Program Manager , the predecessor of Defense AT&L magazine

  12. 76 FR 64072 - Membership of the Bureau of Industry and Security Performance Review Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ...: Ruthie B. Stewart, Department of Commerce Human Resources Operations Center (DOCHROC), Office of Staffing..., and Classification, Department of Commerce Human Resources Operations Center. [FR Doc. 2011-26740... the appointing authority on other performance management issues, such as pay adjustments, bonuses and...

  13. Competencies of front-line managers in supported accommodation: issues for practice and future research.

    PubMed

    Clement, Tim; Bigby, Christine

    2012-06-01

    Front-line managers of supported accommodation for people with intellectual disability are assumed to have a key role in the realisation of outcomes for service users. Yet, their job has been little researched. A job analysis from Minnesota that identified 142 competencies required of effective front-line managers was used to examine what was expected of the equivalent position in Victoria, Australia. These competencies formed the basis of semistructured interviews with an extreme sample of 16 high-performing house supervisors and 5 more senior managers. Ninety-two percent of the original competences were retained, with changes in language and terminology to reflect the local context. Emergent findings highlighted the importance of house supervisors' "orientations." The findings support the proposition that the front-line manager's job is underpinned by core competencies and that the role merits further study. Issues of wider significance for human service organisations and researchers are discussed.

  14. 14 CFR 91.1017 - Amending program manager's management specifications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... proposed amendment. (2) The Flight Standards District Office that issued the program manager's management... presented, the Flight Standards District Office that issued the program manager's management specifications... Standards District Office that issued the program manager's management specifications issues an amendment of...

  15. 14 CFR 91.1017 - Amending program manager's management specifications.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... proposed amendment. (2) The Flight Standards District Office that issued the program manager's management... presented, the Flight Standards District Office that issued the program manager's management specifications... Standards District Office that issued the program manager's management specifications issues an amendment of...

  16. Pratt and Whitney Overview and Advanced Health Management Program

    NASA Technical Reports Server (NTRS)

    Inabinett, Calvin

    2008-01-01

    Hardware Development Activity: Design and Test Custom Multi-layer Circuit Boards for use in the Fault Emulation Unit; Logic design performed using VHDL; Layout power system for lab hardware; Work lab issues with software developers and software testers; Interface with Engine Systems personnel with performance of Engine hardware components; Perform off nominal testing with new engine hardware.

  17. Australian fly-in, fly-out operations: Impacts on communities, safety, workers and their families.

    PubMed

    Langdon, Rebecca R; Biggs, Herbert C; Rowland, Bevan

    2016-10-17

    Australia's mineral, resource and infrastructure sectors continues to expand as operations in rural and remote locations increasingly rely on fly-in, fly-out or drive-in, drive-out workforces in order to become economically competitive. The issues in effectively managing these workforces are becoming more apparent with reported high amounts of turnover and concerns for safety and performance. The issues presented include a range of physical, mental, psychosocial, safety and community challenges. This review aims to consolidate a range of research conducted to communicate potential challenges for industry in relation to a wide variety of issues when engaging and using FIFO/DIDO workforces which includes compressed working schedule design (work schedules), working hours, fatigue, safety performance, employee wellbeing, turnover, psychosocial relationships and community concerns. A comprehensive literature review was performed using EBSCOhost, PubMed and google scholar, with a focus on FIFO or DIDO workforces engaged within the resources sector. Search terms were kept broad in order to capture all national and international research conducted and included: "fly-in, fly-out" "FIFO" "DIDO" "drive-in, drive-out" "mining". There was no date restriction included in the search. Many of the studies were focused on sleep quality, fatigue and the influence of lowered safety performance while at work, presenting an increased risk for health and safety. These issues may be exacerbated for the FIFO workforce when linked to additional research surrounding the extended periods of absence from families influencing workers personal relationships, psychological wellbeing, job satisfaction and the reported high amounts of turnover within the industry. Taken together, this presents a unique implication for the management and continued use of FIFO workforces when considering balancing safety and performance with economic viability of production and operations. The issues of long working hours, fatigue, turnover and job satisfaction are not new to the management of workers. However, FIFO workforces appear to be at an increased risk physically and mentally due to a culmination of other influences, such as extended and frequent periods of absence from friends and families which contribute to feelings of isolation and lowered psychological wellbeing. FIFO workers and their families, engage in a unique lifestyle, rarely are other workers subjected to long hours and compressed work weeks while separated or isolated from their families for extended periods of time. Recently, FIFO interest has shifted to understanding the influences on employee engagement, satisfaction, retention and safety. Considering the management of FIFO workforces from a holistic perspective incorporating all of the issues impacting on these workers may assist to ensure the challenges associated with FIFO employment are understood, addressed and communicated to workers and their families is crucial for safety and health.

  18. SubJournal: For Personnel Responsible for Substitute Teaching. Volume 5, Number 2, Fall 2004

    ERIC Educational Resources Information Center

    Smith, Geoffrey G., Ed.; Tippetts, Zach, Ed.

    2004-01-01

    This issue of "SubJournal" focuses on research and reports relating to substitute teaching, teacher absenteeism, and classroom management. Articles included within this issue are as follows: (1) No Substitute for Quality: A Time Series Quasi-Experimental Study of the Effects of a Pay for Performance Remedy for Teacher Absenteeism (Susan Lugo); (2)…

  19. Issues Specific to Women

    MedlinePlus

    ... VA for Vets Performance Based Interviewing Clinical Trainees (Academic Affiliations) Employees & Contractors Talent Management System (TMS) VA ... stress. Search Pilots Search PILOTS *, the largest citation database on PTSD. What is PILOTS? Subscribe Sign up ...

  20. Getting the Best Out of Your Competencies.

    ERIC Educational Resources Information Center

    Strebler, Marie; And Others

    A study explored practical issues in the use of competencies in performance review and in assessment and measurement of competencies by eight leading British employers at different stages in their use of competencies. The practices of 5 organizations using competencies for performance review of their managers were evaluated through feedback from…

  1. 77 FR 64796 - Membership of the Bureau of Industry and Security Performance Review Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ...: Ruthie B. Stewart, Department of Commerce Human Resources Operations Center (DOCHROC), Office of Staffing... Classification, Department of Commerce Human Resources Operations Center. [FR Doc. 2012-26062 Filed 10-22-12; 8... the appointing authority on other performance management issues, such as pay adjustments, bonuses and...

  2. Development Issues on Linked Data Weblog Enrichment

    NASA Astrophysics Data System (ADS)

    Ruiz-Rube, Iván; Cornejo, Carlos M.; Dodero, Juan Manuel; García, Vicente M.

    In this paper, we describe the issues found during the development of LinkedBlog, a Linked Data extension for WordPress blogs. This extension enables to enrich text-based and video information contained in blog entries with RDF triples that are suitable to be stored, managed and exploited by other web-based applications. The issues have to do with the generality, usability, tracking, depth, security, trustiness and performance of the linked data enrichment process. The presented annotation approach aims at maintaining web-based contents independent from the underlying ontological model, by providing a loosely coupled RDFa-based approach in the linked data application. Finally, we detail how the performance of annotations can be improved through a semantic reasoner.

  3. Heat dissipation investigation of the internal heat sink geometry of a commercial available LED lamp

    NASA Astrophysics Data System (ADS)

    Lai, S. L.; Ong, N. R.; Kirtsaeng, S.; Sakuntasathien, S.; Alcain, J. B.; Sauli, Z.; Thangsi, K.; Retnasamy, V.

    2017-09-01

    Thermal issue is still the bottleneck of the LED to sustain their operational performance. LED lamp is vastly commercialized and has become the next generation of lighting source to substitute the conventional incandescent lamp. Thus, thermal management issue on LED lamp is important to maintain the device reliability. This study focuses on the modification of internal heat sink of the LED lamp which was considered and the thermal performance was investigated. Open source software, Salome and Elmer were used for this study. The result shows that larger surface area of heat sink has better heat dissipation performance.

  4. Management practices and performance of mergers and acquisitions in Pakistan: mediating role of psychological contract.

    PubMed

    Bari, Muhammad Waseem; Fanchen, Meng; Baloch, Muhammad Awais

    2016-01-01

    The objective of this study is to examine the direct and indirect effect of management practices (procedural justice, coordination approach, communication system, integration strategy, and coping programs) on merger and acquisition (M&A) performance in the Pakistan banking industry. Psychological contract (PC) acts as a mediator between Management practices and M&A performance. The Present study distributes a structured questionnaire to 700 bank employees of different management cadres. The useful response rate is 76 % (536 employees). It uses PLS-SEM technique for data analysis. (1) procedural justice is a key strategy which has highly significant direct and indirect effect on M&A performance; however integration strategy and the communication system have an only direct effect. (2) PC performs partial mediation at different levels between management practices and M&A financial and non-financial performance. This study provides an effective solution to solve the soft issues during and post-M&A process. This is one of the few studies which effectively integrate the five constructs into a single framework to study their effects on M&A performance. Limitations and future research directions are presented in the last section of the study.

  5. Waste Management Using Request-Based Virtual Organizations

    NASA Astrophysics Data System (ADS)

    Katriou, Stamatia Ann; Fragidis, Garyfallos; Ignatiadis, Ioannis; Tolias, Evangelos; Koumpis, Adamantios

    Waste management is on top of the political agenda globally as a high priority environmental issue, with billions spent on it each year. This paper proposes an approach for the disposal, transportation, recycling and reuse of waste. This approach incorporates the notion of Request Based Virtual Organizations (RBVOs) using a Service Oriented Architecture (SOA) and an ontology that serves the definition of waste management requirements. The populated ontology is utilized by a Multi-Agent System which performs negotiations and forms RBVOs. The proposed approach could be used by governments and companies searching for a means to perform such activities in an effective and efficient manner.

  6. The Impact of Learner Characteristics on Learning Performance in Hybrid Courses among Japanese Students

    ERIC Educational Resources Information Center

    Nakayama, Minoru; Yamamoto, Hiroh; Santiago, Rowena

    2007-01-01

    To improve the management of hybrid courses, the relationship between learner characteristics and learning performance was analyzed in two regular university courses. Undergraduate and graduate students participated in two 15-week hybrid courses which consisted of face-to-face lectures (Information Industrial issues), and the corresponding modules…

  7. An Analysis of Voluntary Disclosure of Performance Indicators by Canadian Universities

    ERIC Educational Resources Information Center

    Maingot, Michael; Zeghal, Daniel

    2008-01-01

    Managing by performance indicators (PIs) is an important and controversial issue for many stakeholders concerned with higher education in the university systems all over the world. This study analyzes the voluntary disclosures of PIs by Canadian universities. The sample consisted of the 44 universities used by Maclean's Canadian Universities…

  8. The Effects of Racial Conflict on Organizational Performance: A Search for Theory

    ERIC Educational Resources Information Center

    Byrd, Marilyn Y.

    2007-01-01

    This article addresses the effect of racial conflict on organizational performance as an issue that needs theoretical support in the foundational theories of human resource development (HRD). While the field of HRD recognizes theories from multiple disciplines, the field lacks a theoretical framework to inform leadership in managing racial…

  9. Publications about Indoor Air Quality in Schools

    EPA Pesticide Factsheets

    Publications and resources that relate to indoor air quality in schools, and design tools for schools. These publications cover a wide range of issues, including IAQ management, student performance, asthma, mold and moisture, and radon.

  10. Developing high-performance cross-functional teams: Understanding motivations, functional loyalties, and teaming fundamentals

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, M.A.

    1996-08-01

    Teamwork is the key to the future of effective technology management. Today`s technologies and markets have become too complex for individuals to work alone. Global competition, limited resources, cost consciousness, and time pressures have forced organizations and project managers to encourage teamwork. Many of these teams will be cross-functional teams that can draw on a multitude of talents and knowledge. To develop high-performing cross-functional teams, managers must understand motivations, functional loyalties, and the different backgrounds of the individual team members. To develop a better understanding of these issues, managers can learn from experience and from literature on teams and teamingmore » concepts. When studying the literature to learn about cross-functional teaming, managers will find many good theoretical concepts, but when put into practice, these concepts have varying effects. This issue of varying effectiveness is what drives the research for this paper. The teaming concepts were studied to confirm or modify current understanding. The literature was compared with a {open_quotes}ground truth{close_quotes}, a survey of the reality of teaming practices, to examine the teaming concepts that the literature finds to be critical to the success of teams. These results are compared to existing teams to determine if such techniques apply in real-world cases.« less

  11. A Principle-Attribute Matrix for Environmentally Sustainable Management Education and Its Application: The Case for Change-Oriented Service-Learning Projects

    ERIC Educational Resources Information Center

    Rands, Gordon P.

    2009-01-01

    The environmental threats humanity faces have led businesses to increasingly commit to improve their environmental performance and to increasing attempts to address environmental issues in management education. This article presents a matrix of (a) principles that can underlie and (b) attributes that can be generated by environmentally focused…

  12. Research Initiatives and Preliminary Results In Automation Design In Airspace Management in Free Flight

    NASA Technical Reports Server (NTRS)

    Corker, Kevin; Lebacqz, J. Victor (Technical Monitor)

    1997-01-01

    The NASA and the FAA have entered into a joint venture to explore, define, design and implement a new airspace management operating concept. The fundamental premise of that concept is that technologies and procedures need to be developed for flight deck and ground operations to improve the efficiency, the predictability, the flexibility and the safety of airspace management and operations. To that end NASA Ames has undertaken an initial development and exploration of "key concepts" in the free flight airspace management technology development. Human Factors issues in automation aiding design, coupled aiding systems between air and ground, communication protocols in distributed decision making, and analytic techniques for definition of concepts of airspace density and operator cognitive load have been undertaken. This paper reports the progress of these efforts, which are not intended to definitively solve the many evolving issues of design for future ATM systems, but to provide preliminary results to chart the parameters of performance and the topology of the analytic effort required. The preliminary research in provision of cockpit display of traffic information, dynamic density definition, distributed decision making, situation awareness models and human performance models is discussed as they focus on the theme of "design requirements".

  13. STGT program: Ada coding and architecture lessons learned

    NASA Technical Reports Server (NTRS)

    Usavage, Paul; Nagurney, Don

    1992-01-01

    STGT (Second TDRSS Ground Terminal) is currently halfway through the System Integration Test phase (Level 4 Testing). To date, many software architecture and Ada language issues have been encountered and solved. This paper, which is the transcript of a presentation at the 3 Dec. meeting, attempts to define these lessons plus others learned regarding software project management and risk management issues, training, performance, reuse, and reliability. Observations are included regarding the use of particular Ada coding constructs, software architecture trade-offs during the prototyping, development and testing stages of the project, and dangers inherent in parallel or concurrent systems, software, hardware, and operations engineering.

  14. Determinants of financial performance of home-visit nursing agencies in Japan.

    PubMed

    Fukui, Sakiko; Yoshiuchi, Kazuhiro; Fujita, Junko; Ikezaki, Sumie

    2014-01-09

    Japan has the highest aging population in the world and promotion of home health services is an urgent policy issue. As home-visit nursing plays a major role in home health services, the Japanese government began promotion of this activity in 1994. However, the scale of home-visit nursing agencies has remained small (the average numbers of nursing staff and other staff were 4.2 and 1.7, respectively, in 2011) and financial performance (profitability) is a concern in such small agencies. Additionally, the factors related to profitability in home-visit nursing agencies in Japan have not been examined multilaterally and in detail. Therefore, the purpose of the study was to examine the determinants of financial performance of home-visit nursing agencies. We performed a nationwide survey of 2,912 randomly selected home-visit nursing agencies in Japan. Multinomial logistic regression was used to clarify the determinants of profitability of the agency (profitable, stable or unprofitable) based on variables related to management of the agency (operating structure, management by a nurse manager, employment, patient utilization, quality control, regional cooperation, and financial condition). Among the selected home-visit nursing agencies, responses suitable for analysis were obtained from 1,340 (effective response rate, 46.0%). Multinomial logistic regression analysis showed that both profitability and unprofitability were related to multiple variables in management of the agency when compared to agencies with stable financial performance. These variables included the number of nursing staff/rehabilitation staff/patients, being owned by a hospital, the number of cooperative hospitals, home-death rate among terminal patients, controlling staff objectives by nurse managers, and income going to compensation. The results suggest that many variables in management of a home-visit nursing agency, including the operating structure of the agency, regional cooperation, staff employment, patient utilization, and quality control of care, have an influence in both profitable and unprofitable agencies. These findings indicate the importance of consideration of management issues in achieving stable financial performance in home-visit nursing agencies in Japan. The findings may also be useful in other countries with growing aging populations.

  15. Determinants of financial performance of home-visit nursing agencies in Japan

    PubMed Central

    2014-01-01

    Background Japan has the highest aging population in the world and promotion of home health services is an urgent policy issue. As home-visit nursing plays a major role in home health services, the Japanese government began promotion of this activity in 1994. However, the scale of home-visit nursing agencies has remained small (the average numbers of nursing staff and other staff were 4.2 and 1.7, respectively, in 2011) and financial performance (profitability) is a concern in such small agencies. Additionally, the factors related to profitability in home-visit nursing agencies in Japan have not been examined multilaterally and in detail. Therefore, the purpose of the study was to examine the determinants of financial performance of home-visit nursing agencies. Methods We performed a nationwide survey of 2,912 randomly selected home-visit nursing agencies in Japan. Multinomial logistic regression was used to clarify the determinants of profitability of the agency (profitable, stable or unprofitable) based on variables related to management of the agency (operating structure, management by a nurse manager, employment, patient utilization, quality control, regional cooperation, and financial condition). Results Among the selected home-visit nursing agencies, responses suitable for analysis were obtained from 1,340 (effective response rate, 46.0%). Multinomial logistic regression analysis showed that both profitability and unprofitability were related to multiple variables in management of the agency when compared to agencies with stable financial performance. These variables included the number of nursing staff/rehabilitation staff/patients, being owned by a hospital, the number of cooperative hospitals, home-death rate among terminal patients, controlling staff objectives by nurse managers, and income going to compensation. Conclusions The results suggest that many variables in management of a home-visit nursing agency, including the operating structure of the agency, regional cooperation, staff employment, patient utilization, and quality control of care, have an influence in both profitable and unprofitable agencies. These findings indicate the importance of consideration of management issues in achieving stable financial performance in home-visit nursing agencies in Japan. The findings may also be useful in other countries with growing aging populations. PMID:24400964

  16. Using Risk Assessment Methodologies to Meet Management Objectives

    NASA Technical Reports Server (NTRS)

    DeMott, D. L.

    2015-01-01

    Corporate and program objectives focus on desired performance and results. ?Management decisions that affect how to meet these objectives now involve a complex mix of: technology, safety issues, operations, process considerations, employee considerations, regulatory requirements, financial concerns and legal issues. ?Risk Assessments are a tool for decision makers to understand potential consequences and be in a position to reduce, mitigate or eliminate costly mistakes or catastrophic failures. Using a risk assessment methodology is only a starting point. ?A risk assessment program provides management with important input in the decision making process. ?A pro-active organization looks to the future to avoid problems, a reactive organization can be blindsided by risks that could have been avoided. ?You get out what you put in, how useful your program is will be up to the individual organization.

  17. The relationship between energy information management and energy management performance in higher education sector in Thailand, considering from resource and process based views

    NASA Astrophysics Data System (ADS)

    Mongkolsawat, Darunee

    The performance of energy management is usually considered through the energy reduction result however this does not sufficient for managing facility's energy in the long term. In combination to that, this study decides to investigate the relationship between the effectiveness of energy information management and the energy management performance. The interested sector is higher education institutions in Thailand due to their complex organisation both in management and property aspects. By not focusing on quantitative energy reduction as centre, the study seeks to establish a framework or tool in helping to understand such relationship qualitatively through organisation resource and process based view. Additionally, energy management structure is also accounted as initial factor. In relation to such framework, the performance of energy management is considered on its primary results concerning the issues of the data available, analysis results, and energy action. After the investigation, it is found that between the concerned factors and primary performance there are various specific relationships. For example, some tend to have direct connections as relations between the energy management structure and implemented actions, and between the investment in organisation resources and data available. While some have flexible relations as between data collection and results of analysed data. Furthermore, the load of energy management has been found influencing on organisation's motivation to invest in energy management. At the end of the paper, further application to the study is also proposed.

  18. Earth Observation Data Quality Monitoring and Control: A Case Study of STAR Central Data Repository

    NASA Astrophysics Data System (ADS)

    Han, W.; Jochum, M.

    2017-12-01

    Earth observation data quality is very important for researchers and decision makers involved in weather forecasting, severe weather warning, disaster and emergency response, environmental monitoring, etc. Monitoring and control earth observation data quality, especially accuracy, completeness, and timeliness, is very useful in data management and governance to optimize data flow, discover potential transmission issues, and better connect data providers and users. Taking a centralized near real-time satellite data repository, STAR (Center for Satellite Applications and Research of NOAA) Central Data Repository (SCDR), as an example, this paper describes how to develop new mechanism to verify data integrity, check data completeness, and monitor data latency in an operational data management system. Such quality monitoring and control of large volume satellite data help data providers and managers improve data transmission of near real-time satellite data, enhance its acquisition and management, and overcome performance and management issues to better serve research and development activities.

  19. FAA airborne data link human factors research plan

    DOT National Transportation Integrated Search

    1993-07-01

    This report contains a five-year plan to perform research of human factors issues and topics : related to Data Link implementations in general aviation and transport category aircraft. : Elements such as resource allocation and management and coordin...

  20. Human Capital Accumulation: The Role of Human Resource Development.

    ERIC Educational Resources Information Center

    Garavan, Thomas N.; Morley, Michael; Gunnigle, Patrick; Collins, Eammon

    2001-01-01

    Presents definitions of intellectual and human capital. Examines human capital from the individual perspective (employability, performance, career development) and organization perspective (investment, ownership, knowledge management). Reviews papers in the theme issue. (Contains 117 references.) (SK)

  1. Dynamic tables: an architecture for managing evolving, heterogeneous biomedical data in relational database management systems.

    PubMed

    Corwin, John; Silberschatz, Avi; Miller, Perry L; Marenco, Luis

    2007-01-01

    Data sparsity and schema evolution issues affecting clinical informatics and bioinformatics communities have led to the adoption of vertical or object-attribute-value-based database schemas to overcome limitations posed when using conventional relational database technology. This paper explores these issues and discusses why biomedical data are difficult to model using conventional relational techniques. The authors propose a solution to these obstacles based on a relational database engine using a sparse, column-store architecture. The authors provide benchmarks comparing the performance of queries and schema-modification operations using three different strategies: (1) the standard conventional relational design; (2) past approaches used by biomedical informatics researchers; and (3) their sparse, column-store architecture. The performance results show that their architecture is a promising technique for storing and processing many types of data that are not handled well by the other two semantic data models.

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Park, Nam-Gyu; Grätzel, Michael; Miyasaka, Tsutomu

    Solar cells employing a halide perovskite with an organic cation now show power conversion efficiency of up to 22%. But, these cells are facing issues towards commercialization, such as the need to achieve long-term stability and the development of a manufacturing method for the reproducible fabrication of high-performance devices. We propose a strategy to obtain stable and commercially viable perovskite solar cells. A reproducible manufacturing method is suggested, as well as routes to manage grain boundaries and interfacial charge transport. Electroluminescence is regarded as a metric to gauge theoretical efficiency. We highlight how optimizing the design of device architectures ismore » important not only for achieving high efficiency but also for hysteresis-free and stable performance. Here, we argue that reliable device characterization is needed to ensure the advance of this technology towards practical applications. We believe that perovskite-based devices can be competitive with silicon solar modules, and discuss issues related to the safe management of toxic material.« less

  3. Study of systems and techniques for data base management

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Data management areas were studied to identify pertinent problems and issues that will affect future NASA data users in terms of performance and cost. Specific topics discussed include the identifications of potential NASA data users other than those normally discussed, consideration affecting the clustering of minicomputers, low cost computer system for information retrieval and analysis, the testing of minicomputer based data base management systems, ongoing work related to the use of dedicated systems for data base management, and the problems of data interchange among a community of NASA data users.

  4. First-line managers' descriptions and reflections regarding their staff's access to empowering structures.

    PubMed

    Skytt, Bernice; Hagerman, Heidi; Strömberg, Annika; Engström, Maria

    2015-11-01

    To elucidate first-line managers' descriptions and reflections regarding their staff's access to empowering structures using Kanter's theory of structural empowerment. Good structural conditions within workplaces are essential to employees' wellbeing, and their ability to access empowerment structures is largely dependent on the management. Twenty-eight first-line managers in elderly care were interviewed. Deductive qualitative content analysis was used to analyse data. Managers perceived that staff had varying degrees of access to the empowering structures described in Kanter's theory - and that they possessed formal power in their roles as contact persons and representatives. The descriptions mostly started from the managers' own actions, although some started from the needs of staff members. All managers described their staff's access to the empowering structures in Kanter's theory as important, yet it seemed as though this was not always reflected on and discussed as a strategic issue. Managers could make use of performance and appraisal dialogues to keep up to date on staff's access to empowering structures. Recurrent discussions in the management group based on such current information could promote staff's access to power through empowering structures and make job definitions a strategic issue in the organisation. © 2014 John Wiley & Sons Ltd.

  5. Issues Management and the Role of Strategic Planning. AIR 1985 Annual Forum Paper.

    ERIC Educational Resources Information Center

    Lozier, G. Gregory; Chittipeddi, Kumar

    The integration of issues management into the institutional strategic planning process at Pennsylvania State University is discussed. The significance of issues management as an organizational process is also considered. Stages of the issues management process are: (1) scanning the external environment to identify strategic issues; (2) analyzing…

  6. Synergi and E&P forum HSE management system helps companies improve HSE performance and reduce losses

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grundt, H.J.

    1996-12-31

    This paper discusses the use of information on accidents and near-misses to improve HSE performance and reduce losses in Exploration and Production activities. Incidents are considered a result of management system failure. To avoid incidents and recurrence of incidents, companies should adopt an integrated HSE Management System and software especially designed for recording, analyzing and following up events. The E&P Forum has issued guidelines to support current company HSE Management systems and practices. Concurrently, the Synergi Project has been established to facilitate experience transfer and effective handling of incidents as part of an integrated HSE Management System. The paper describesmore » how important it is to learn from past mistakes, to have a management system which facilitates the implementation of the required corrective action, and that tools for improved loss control are available.« less

  7. Spent Nuclear Fuel (SNF) project Integrated Safety Management System phase I and II Verification Review Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    CARTER, R.P.

    1999-11-19

    The U.S. Department of Energy (DOE) commits to accomplishing its mission safely. To ensure this objective is met, DOE issued DOE P 450.4, Safety Management System Policy, and incorporated safety management into the DOE Acquisition Regulations ([DEAR] 48 CFR 970.5204-2 and 90.5204-78). Integrated Safety Management (ISM) requires contractors to integrate safety into management and work practices at all levels so that missions are achieved while protecting the public, the worker, and the environment. The contractor is required to describe the Integrated Safety Management System (ISMS) to be used to implement the safety performance objective.

  8. Invasive meningococcal disease--improving management through structured review of cases in the Hunter New England area, Australia.

    PubMed

    Guimont, Chantal; Hullick, Carolyn; Durrheim, David; Ryan, Nick; Ferguson, John; Massey, Peter

    2010-03-01

    Invasive meningococcal disease (IMD) is the most common infectious cause of death in childhood in developed countries. This disease may cause severe disability or death if a patient is sub-optimally managed. An audit was performed in Australia of all 2005-06 notified IMD cases to elicit correctable issues. Over the 2 year period, 24 cases were notified in the Hunter New England Health area. These cases were reviewed by an expert panel to highlight key correctable issues in recognition and management of IMD. The 24 patients were aged between 1 month and 70 years. Thirteen (54%) were children and 14 (58%) were women. Six (25%) cases developed complications, two being severe (one death, one limb amputations). These patients had risk factors for IMD. The emergency department average delay between assessment and administration of antibiotics was 57.8 min. There were avoidable factors identified in both patients with a poor outcome. Length of delay in initiating antibiotic therapy has been associated with poor outcome, thus the delay in our series is of concern. The audit highlighted many potentially correctable issues in the medical, laboratory and public health management of IMD cases.

  9. Distributed Information System Development: Review of Some Management Issues

    NASA Astrophysics Data System (ADS)

    Mishra, Deepti; Mishra, Alok

    Due to the proliferation of the Internet and globalization, distributed information system development is becoming popular. In this paper we have reviewed some significant management issues like process management, project management, requirements management and knowledge management issues which have received much attention in distributed development perspective. In this literature review we found that areas like quality and risk management issues could get only scant attention in distributed information system development.

  10. Principles of disaster management lesson. 12: structuring organizations.

    PubMed

    Cuny, F C

    2001-01-01

    This lesson discusses various structures for organizations that have functional roles in disaster responses, relief, and/or management activities. It distinguishes between pyramidal and matrix structures, and notes the advantages and disadvantages of each in relation to disasters. Span of control issues are dissected including the impact of the "P" factor on the performance of disaster managers and workers including its relationship to the coordination and control function. The development of a Table of Organization and how it relates to departmentalization within an organization also is provided.

  11. Development of a naming convention and data ma nagement system

    NASA Technical Reports Server (NTRS)

    Mcnider, Richard T.; Botts, Michael; Moss, Don; Conover, Helen; Criswell, Evan; Graves, Sara; Hardin, Danny

    1993-01-01

    This contract covered work in data management, acquisition, and analysis for the Earth Science and Applications Division (ESAD) of the Space Science Laboratory of MSFC. Under this contract, a naming convention and data management system were developed for ESAD data sets, data visualization, and standard data format issues were investigated, and specific data analysis and management needs were addressed for several ESAD projects and data sets. In the following sections, details of the research performed over the duration of this contract are summarized.

  12. A Study on the Effect on Scheduling and Management of Surgeries with the Introduction of Excellent Medical Information.

    PubMed

    Mei, Tsai Ching

    2016-01-01

    The services of OR play an important role in the medical business for department of surgery. The most important issue for OR is about the scheduling and management of surgeries. Good surgery schedule could elevate the utilization efficiency of OR. Therefore, the introduction of excellent medical information can both dramatically elevate the work efficiency of health care employees and reduce workload to reach win-win benefits in both management and performance.

  13. Do we need a critical care ultrasound certification program? Implications from an Australian medical-legal perspective.

    PubMed

    Huang, Stephen J; McLean, Anthony S

    2010-01-01

    Medical practitioners have a duty to maintain a certain standard of care in providing their services. With critical care ultrasound gaining popularity in the ICU, it is envisaged that more intensivists will use the tool in managing their patients. Ultrasound, especially echocardiography, can be an 'easy to learn, difficult to manage' skill, and the competency in performing the procedure varies greatly. In view of this, several recommendations for competency statements have been published in recent years to advocate the need for a unified approach to training and certification. In this paper, we take a slightly different perspective, from an Australian medical-legal viewpoint, to argue for the need to implement a critical care ultrasound certification program. We examine various issues that can potentially lead to a breach of the standard of care, hence exposing the practitioners and/or the healthcare institutions to lawsuits in professional negligence or breach of contract. These issues, among others, include the failure to use ultrasound in appropriate situations, the failure of hospitals to ensure practitioners are properly trained in the skills, the failure of practitioners to perform an ultrasound study that is of a reasonable standard, and the failure of practitioners to keep themselves abreast of the latest developments in treatment and management. The implications of these issues and the importance of having a certification process are discussed.

  14. Do we need a critical care ultrasound certification program? Implications from an Australian medical-legal perspective

    PubMed Central

    2010-01-01

    Medical practitioners have a duty to maintain a certain standard of care in providing their services. With critical care ultrasound gaining popularity in the ICU, it is envisaged that more intensivists will use the tool in managing their patients. Ultrasound, especially echocardiography, can be an 'easy to learn, difficult to manage' skill, and the competency in performing the procedure varies greatly. In view of this, several recommendations for competency statements have been published in recent years to advocate the need for a unified approach to training and certification. In this paper, we take a slightly different perspective, from an Australian medical-legal viewpoint, to argue for the need to implement a critical care ultrasound certification program. We examine various issues that can potentially lead to a breach of the standard of care, hence exposing the practitioners and/or the healthcare institutions to lawsuits in professional negligence or breach of contract. These issues, among others, include the failure to use ultrasound in appropriate situations, the failure of hospitals to ensure practitioners are properly trained in the skills, the failure of practitioners to perform an ultrasound study that is of a reasonable standard, and the failure of practitioners to keep themselves abreast of the latest developments in treatment and management. The implications of these issues and the importance of having a certification process are discussed. PMID:20550724

  15. Management of space networks

    NASA Technical Reports Server (NTRS)

    Markley, R. W.; Williams, B. F.

    1993-01-01

    NASA has proposed missions to the Moon and Mars that reflect three areas of emphasis: human presence, exploration, and space resource development for the benefit of Earth. A major requirement for such missions is a robust and reliable communications architecture. Network management--the ability to maintain some degree of human and automatic control over the span of the network from the space elements to the end users on Earth--is required to realize such robust and reliable communications. This article addresses several of the architectural issues associated with space network management. Round-trip delays, such as the 5- to 40-min delays in the Mars case, introduce a host of problems that must be solved by delegating significant control authority to remote nodes. Therefore, management hierarchy is one of the important architectural issues. The following article addresses these concerns, and proposes a network management approach based on emerging standards that covers the needs for fault, configuration, and performance management, delegated control authority, and hierarchical reporting of events. A relatively simple approach based on standards was demonstrated in the DSN 2000 Information Systems Laboratory, and the results are described.

  16. The Organizational Decision Making Climate of Issues Management Programs: A Case Study.

    ERIC Educational Resources Information Center

    Wills, Sandra

    A study examined the decision making climate of organizations that are using issues management and what type of model of issues management is followed--theorists have been attempting to define issues management since it began appearing 20 year ago. Subjects, 112 males and 30 females who were professionals working in the area of issues management…

  17. Reliability issues in active control of large flexible space structures

    NASA Technical Reports Server (NTRS)

    Vandervelde, W. E.

    1986-01-01

    Efforts in this reporting period were centered on four research tasks: design of failure detection filters for robust performance in the presence of modeling errors, design of generalized parity relations for robust performance in the presence of modeling errors, design of failure sensitive observers using the geometric system theory of Wonham, and computational techniques for evaluation of the performance of control systems with fault tolerance and redundancy management

  18. Intelligent Decentralized Control In Large Distributed Computer Systems

    DTIC Science & Technology

    1988-04-01

    decentralized. The goal is to find a way for the agents to coordinate their actions to maximize some index of system performance. (Our main...shown in Figure 4.13. The controller observes the environ- ment through sensors, and then may issue a command (i.e., take action ) to affect the...the Hypothesis Generator and the Belief Manager, and finally actions are issued by the Action Generator, the Experiment Generator, or the Reflex

  19. Hierarchical Storage Management at the NASA Center for Computational Sciences: From UniTree to SAM-QFS

    NASA Technical Reports Server (NTRS)

    Salmon, Ellen; Tarshish, Adina; Palm, Nancy; Patel, Sanjay; Saletta, Marty; Vanderlan, Ed; Rouch, Mike; Burns, Lisa; Duffy, Daniel; Caine, Robert

    2004-01-01

    This paper presents the data management issues associated with a large center like the NCCS and how these issues are addressed. More specifically, the focus of this paper is on the recent transition from a legacy UniTree (Legato) system to a SAM-QFS (Sun) system. Therefore, this paper will describe the motivations, from both a hardware and software perspective, for migrating from one system to another. Coupled with the migration from UniTree into SAM-QFS, the complete mass storage environment was upgraded to provide high availability, redundancy, and enhanced performance. This paper will describe the resulting solution and lessons learned throughout the migration process.

  20. Earnings Management before Rights Issues and the Subsequent Cash Transfer in Chinese Firms

    NASA Astrophysics Data System (ADS)

    Tsai, Bi-Huei

    2009-08-01

    Unlike private enterprises in developed markets, political influence is profound upon Chinese state-dominated firms. Under this consideration, this paper demonstrates how political impact interferes in Chinese managers' decisions. State-assigned managers were found to deliberately transfer cash raised via rights issues from the public shareholders to the state by cash dividends in order to please Chinese politicians. Especially, to meet the regulatory requirement of rights issues, managers from firms which distributed more cash dividends in the same year of rights issues were more likely to inflate earnings before rights issues. The earnings inflation which managers use to boost firm's incomes is defined as "earnings management." Furthermore, the empirical results also exhibit that firm's close relationship with the state enables managers to obtain approvals of rights issues easily, which reduces the firm's earnings management tendency. The manager's incentives of earnings management is closely attributed to the political intervention.

  1. Performance of Clinical Nurse Educators in Teaching Pharmacology and Medication Management: Nursing Students’ Perceptions

    PubMed Central

    Ghamari Zare, Zohre; Adib-Hajbaghery, Mohsen

    2016-01-01

    Background Pharmacological knowledge and medication management skills of student nurses greatly depend on the clinical nurse educators’ performance in this critical issue. However, the Iranian nurse educators’ performance in teaching pharmacology and medication management are not adequately studied. Objectives The current study aimed to investigate the nursing students’ perceptions on the status of clinical pharmaceutical and medication management education. Materials and Methods A cross-sectional study was conducted on all 152 nursing students registered in the seventh and eighth semesters at the Qom and Naragh branches of Islamic Azad University, and Kashan University of Medical Sciences in 2013 - 2014 academic year. The students’ perceptions on the performance of clinical nurse educators in teaching pharmacology and medication management were assessed using a researcher made questionnaire. The questionnaire consisted of 31 items regarding clinical educators’ performance in teaching pharmacology and medication management and two questions about students’ satisfaction with their level of knowledge and skills in pharmacology and medication management. Descriptive statistics was employed and analysis of variance was performed to compare the mean of scores of teaching pharmacology and medication management in the three universities. Results Among a total of 152 subjects, 82.9% were female and their mean age was 22.57 ± 1.55 years. According to the students, instructors had the weakest performance in the three items of teaching pharmacology and medication management based on the students’ learning needs, teaching medication management through a patient-centered method and teaching pharmacology and medication management based on the course plan. The students’ satisfaction regarding their own knowledge and skill of pharmacology and medication management was at medium level. Conclusions Nursing students gave a relatively low score in several aspects of their instructors’ performance regarding teaching pharmacology and medication management. It seems that many clinical nurse educators in the studied settings were incompetent especially in teaching pharmacology and medication management, while these are critical areas and need special attention. PMID:27331055

  2. Performance of Clinical Nurse Educators in Teaching Pharmacology and Medication Management: Nursing Students' Perceptions.

    PubMed

    Ghamari Zare, Zohre; Adib-Hajbaghery, Mohsen

    2016-03-01

    Pharmacological knowledge and medication management skills of student nurses greatly depend on the clinical nurse educators' performance in this critical issue. However, the Iranian nurse educators' performance in teaching pharmacology and medication management are not adequately studied. The current study aimed to investigate the nursing students' perceptions on the status of clinical pharmaceutical and medication management education. A cross-sectional study was conducted on all 152 nursing students registered in the seventh and eighth semesters at the Qom and Naragh branches of Islamic Azad University, and Kashan University of Medical Sciences in 2013 - 2014 academic year. The students' perceptions on the performance of clinical nurse educators in teaching pharmacology and medication management were assessed using a researcher made questionnaire. The questionnaire consisted of 31 items regarding clinical educators' performance in teaching pharmacology and medication management and two questions about students' satisfaction with their level of knowledge and skills in pharmacology and medication management. Descriptive statistics was employed and analysis of variance was performed to compare the mean of scores of teaching pharmacology and medication management in the three universities. Among a total of 152 subjects, 82.9% were female and their mean age was 22.57 ± 1.55 years. According to the students, instructors had the weakest performance in the three items of teaching pharmacology and medication management based on the students' learning needs, teaching medication management through a patient-centered method and teaching pharmacology and medication management based on the course plan. The students' satisfaction regarding their own knowledge and skill of pharmacology and medication management was at medium level. Nursing students gave a relatively low score in several aspects of their instructors' performance regarding teaching pharmacology and medication management. It seems that many clinical nurse educators in the studied settings were incompetent especially in teaching pharmacology and medication management, while these are critical areas and need special attention.

  3. Simulation-Based Testing of Pager Interruptions During Laparoscopic Cholecystectomy.

    PubMed

    Sujka, Joseph A; Safcsak, Karen; Bhullar, Indermeet S; Havron, William S

    2018-01-30

    To determine if pager interruptions affect operative time, safety, or complications and management of pager issues during a simulated laparoscopic cholecystectomy. Twelve surgery resident volunteers were tested on a Simbionix Lap Mentor II simulator. Each resident performed 6 randomized simulated laparoscopic cholecystectomies; 3 with pager interruptions (INT) and 3 without pager interruptions (NO-INT). The pager interruptions were sent in the form of standardized patient vignettes and timed to distract the resident during dissection of the critical view of safety and clipping of the cystic duct. The residents were graded on a pass/fail scale for eliciting appropriate patient history and management of the pager issue. Data was extracted from the simulator for the following endpoints: operative time, safety metrics, and incidence of operative complications. The Mann-Whitney U test and contingency table analysis were used to compare the 2 groups (INT vs. NO-INT). Level I trauma center; Simulation laboratory. Twelve general surgery residents. There was no significant difference between the 2 groups in any of the operative endpoints as measured by the simulator. However, in the INT group, only 25% of the time did the surgery residents both adequately address the issue and provide effective patient management in response to the pager interruption. Pager interruptions did not affect operative time, safety, or complications during the simulated procedure. However, there were significant failures in the appropriate evaluations and management of pager issues. Consideration for diversion of patient care issues to fellow residents not operating to improve quality and safety of patient care outside the operating room requires further study. Copyright © 2018. Published by Elsevier Inc.

  4. Performance measurement for supply chain management and evaluation criteria determination for reverse supply chain management

    NASA Astrophysics Data System (ADS)

    Kongar, N. Elif

    2004-12-01

    Today, since customers are able to obtain similar-quality products for similar prices, the lead time has become the only preference criterion for most of the consumers. Therefore, it is crucial that the lead time, i.e., the time spent from the raw material phase till the manufactured good reaches the customer, is minimized. This issue can be investigated under the title of Supply Chain Management (SCM). An efficiently managed supply chain can lead to reduced response time for customers. To achieve this, continuous observation of supply chain efficiency, i.e., a constant performance evaluation of the current SCM is required. Widely used conventional performance measurement methods lack the ability to evaluate a SCM since the supply chain is a dynamic system that requires a more thorough and flexible performance measurement technique. Balanced Scorecard (BS) is an efficient tool for measuring the performance of dynamic systems and has a proven capability of providing the decision makers with the appropriate feedback data. In addition to SCM, a relatively new management field, namely reverse supply chain management (RSCM), also necessitates an appropriate evaluation approach. RSCM differs from SCM in many aspects, i.e., the criteria used for evaluation, the high level of uncertainty involved etc., not allowing the usage of identical evaluation techniques used for SCM. This study proposes a generic Balanced Scorecard to measure the performance of supply chain management while defining the appropriate performance measures for SCM. A scorecard prototype, ESCAPE, is presented to demonstrate the evaluation process.

  5. 48 CFR 50.205-1 - SAFETY Act Considerations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CONTRACT MANAGEMENT EXTRAORDINARY CONTRACTUAL ACTIONS AND THE SAFETY ACT Support Anti-terrorism by... performance characteristics are addressed. This is important because the processing times for issuing... applications to DHS and the technical complexity of individual applications. (c) Industry outreach. When...

  6. [Intimate partner violence is not identified as a health problem by health care workers].

    PubMed

    Coll-Vinent, Blanca; Echeverría, Teresa; Farràs, Ursula; Rodríguez, Dolores; Millá, José; Santiñà, Manel

    2008-01-01

    To determine attitudes, opinions and knowledge of domestic violence among medical and nursing staff. We performed a descriptive study of prevalence using an ad hoc questionnaire. A random sample of 321 health professionals were asked about their opinions and knowledge of domestic violence and its relationship with health. A total of 287 health professions completed the questionnaire. Most (87.1%) considered that intimate partner violence was an important problem, but not a health issue. Sixty percent of the health professionals believed that they could play an important role in detecting patients in this situation. Knowledge about the management of this problem was low. Nursing professionals were more sensitive to this issue and better prepared than medical staff. Healthcare personnel are sensitive to the problem of intimate partner violence but do not consider this issue to be a health problem. Education about this phenomenon and its management is required.

  7. TERSSE: Definition of the Total Earth Resources System for the Shuttle Era. Volume 3: Mission and System Requirements for the Total Earth Resources System

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Resource management missions to be performed by TERSSE are described. Mission and user requirements are defined along with information flows developed for each major resource management mission. Other topics discussed include: remote sensing platforms, remote sensor requirements, ground system architecture, and such related issues as cloud cover, resolution, orbit mechanics, and aircraft versus satellite.

  8. Federal Energy Savings Performance Contracts: Frequently Asked Questions on the Scope of 42 U.S.C. § 8287 et seq.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    Document provides clarification and guidance on issues commonly raised regarding the scope of 42 U.S.C. § 8287 et seq. It is a supplement to the Federal Energy Management Program's extensive collection of materials that are available to assist federal agencies execute successful energy savings performance contract (ESPC) projects.

  9. Some Ethical and Cultural Implications of the Leadership "Turn" in Education: On the Distinction between Performance and Performativity

    ERIC Educational Resources Information Center

    Strain, Michael

    2009-01-01

    Leadership, currently prescribed as a key requirement for effective school organization and management, is examined here as a rhetorical or discursive device, as a "turn", in the sense used in literary and sociological discussion of the linguistic turn. In the educational sphere, a tacit separation of leadership from issues of governance…

  10. Functional Coherence in the State Education Agency: A Structure for Performance Management. Solutions. Issue No. 4

    ERIC Educational Resources Information Center

    Redding, Sam; Nafziger, Dean

    2013-01-01

    The purpose of the state education agency (SEA) is to focus the entire education system on helping students become capable in college and career in an increasingly complex world. One of the most vexing problems facing SEAs today is how to meet increasing demands for performance while adjusting to significant resource reductions. Meeting that…

  11. Why the general dentist needs to know how to manage oral lichen planus.

    PubMed

    Price, Stephanie M; Murrah, Valerie A

    2015-01-01

    Oral lichen planus (OLP) is a frequently mismanaged chronic disease that requires care throughout a patient's life, and therefore a condition the general dentist must know how to manage. Patients with OLP often suffer considerable physical discomfort and an inability to perform proper oral hygiene, eventually resulting in poor periodontal health. In addition, these patients are confronted with the psychological stress of knowing that OLP is not curable. This is accompanied by a fear of other negative health developments, particularly oral cancer. The objective of this study was to identify major issues surrounding the management of OLP by the general dentist. A literature review of over 1100 articles was performed. An eclectic compilation of the issues revealed 12 major areas of concern. This article reviews those concerns and presents strategies for coping with the myriad signs, symptoms, and complications associated with this disease, as well as educational approaches and legal considerations. A rationale is provided to place the responsibility for the management of these patients under the person best positioned to coordinate care for this condition--the general dentist. A general dentist can contribute to the overall oral health of an OLP patient with timely diagnosis, effective treatment, thorough patient education, and the orchestration of efforts by a team of health care providers.

  12. Improving the integration of recreation management with management of other natural resources by applying concepts of scale from ecology.

    PubMed

    Morse, Wayde C; Hall, Troy E; Kruger, Linda E

    2009-03-01

    In this article, we examine how issues of scale affect the integration of recreation management with the management of other natural resources on public lands. We present two theories used to address scale issues in ecology and explore how they can improve the two most widely applied recreation-planning frameworks. The theory of patch dynamics and hierarchy theory are applied to the recreation opportunity spectrum (ROS) and the limits of acceptable change (LAC) recreation-planning frameworks. These frameworks have been widely adopted internationally, and improving their ability to integrate with other aspects of natural resource management has significant social and conservation implications. We propose that incorporating ecologic criteria and scale concepts into these recreation-planning frameworks will improve the foundation for integrated land management by resolving issues of incongruent boundaries, mismatched scales, and multiple-scale analysis. Specifically, we argue that whereas the spatially explicit process of the ROS facilitates integrated decision making, its lack of ecologic criteria, broad extent, and large patch size decrease its usefulness for integration at finer scales. The LAC provides explicit considerations for weighing competing values, but measurement of recreation disturbances within an LAC analysis is often done at too fine a grain and at too narrow an extent for integration with other recreation and resource concerns. We suggest that planners should perform analysis at multiple scales when making management decisions that involve trade-offs among competing values. The United States Forest Service is used as an example to discuss how resource-management agencies can improve this integration.

  13. Identifying emerging issues in forestry as a tool for research planning.

    Treesearch

    Hans M. Gregersen; Allen L. Lundgren; Pamela J. Jakes; David N. Bengston

    1989-01-01

    A Delphi exercise is used to identify emerging issues in National Forest management and use, the relative importance of the issues, and barriers to resolving issues. USDA Forest Service managers agree on the importance of the 11 issues identified; however, researchers and National Forest managers do not always agree on the importance of issues or barriers.

  14. Enhancing managerial effectiveness in dietetics.

    PubMed

    Hoover, L W

    1983-01-01

    Environmental pressures from such sources as economic conditions, the government, third-party payers, and inter-institutional competition create managerial challenges. Although cost-containment has received considerable attention, long-term cost-effectiveness is probably the significant issue. Dietitians must become more cost-conscious and effective in resource management to attain desired performance outcomes. Some of the skills and characteristics essential to managerial effectiveness are a marketing orientation, systems design skill, quantitative operations management techniques, financial expertise, and leadership. These abilities facilitate decision-making and achievement of long-term cost-effectiveness. Curriculum enhancement and continuing education are two strategies for improving managerial competency in the dietetics profession. In dietetics education, study of management topics should be enhanced to provide more advanced coverage of management theories and quantitative models so that managerial performance can be at a higher level of sophistication and competency. To assure the viability of the dietetics profession, the emphasis on management must be more comprehensive and rigorous.

  15. Multilevel and Hybrid Architecture for Device Abstraction and Context Information Management in Smart Home Environments

    NASA Astrophysics Data System (ADS)

    Peláez, Víctor; González, Roberto; San Martín, Luis Ángel; Campos, Antonio; Lobato, Vanesa

    Hardware device management, and context information acquisition and abstraction are key factors to develop the ambient intelligent paradigm in smart homes. This work presents an architecture that addresses these two problems and provides a usable framework to develop applications easily. In contrast to other proposals, this work addresses performance issues specifically. Results show that the execution performance of the developed prototype is suitable for deployment in a real environment. In addition, the modular design of the system allows the user to develop applications using different techniques and different levels of abstraction.

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This report summarizes system performance and major project activities over the first four months of 1995. The quarterly technical reports that have been issued for the past several years are being replaced this year by two technical reports covering the January--April and May--August periods, respectively. Performance data for the last four months of the year will be included in the 1995 Progress Report. Principal activities during the first four months of 1995 included bringing two new systems on line, hosting a two-day Balance of System and Procurement workshop at the Davis site, completing and issuing the EMT Five-Year Assessment Report,more » and preparing for a management transition in 1996.« less

  17. Study of the performance of the infrasound Station IS48TN during the period 2011 -2017

    NASA Astrophysics Data System (ADS)

    Mejri, Chourouk

    2017-04-01

    The Infrasound Station IS48, in Kesra, Tunisia is part of the verification regime for the Comprehensive Nuclear-Test-Ban Treaty. IS48 is managed and maintained by the Tunisian NDC. Its good location in the middle of the Mediterranean Sea allows to have various and interesting detections. Several events were recorded and identified. But since 2010, the performance of the station has began to be noisy , due to a leakage in the pipe array, despite efforts to solve the issue through the pressure test and maintenance . To this issues, PTS decided to upgrade the WNRS at IS48TN.

  18. Examining the relationships between span of control and manager job and unit performance outcomes.

    PubMed

    Wong, Carol A; Elliott-Miller, Pat; Laschinger, Heather; Cuddihy, Michael; Meyer, Raquel M; Keatings, Margaret; Burnett, Camille; Szudy, Natalie

    2015-03-01

    Our aim was to examine the combination of frontline manager (FLM) personal characteristics and span of control (SOC) on their job and unit performance outcomes. Healthcare downsizing and reform have contributed to larger spans for FLMs in Canadian hospitals and increased concerns about manager workload. Despite a heightened awareness of SOC issues among decision makers, there is limited empirical evidence related to the effects of SOC on outcomes. A non-experimental predictive survey design was used to examine FLM SOC in 14 Canadian academic hospitals. Managers (n = 121) completed an online survey of work characteristics and The Ottawa Hospital (TOH) SOC tool. Unit turnover data were collected from organisational databases. The combination of SOC and core self-evaluation significantly predicted role overload, work control and job satisfaction, but only SOC predicted unit adverse outcomes and neither significantly predicted unit turnover. The findings contribute to an understanding of connections between the combination of SOC and core self-evaluation and manager job and unit performance outcomes. Organisational strategies to create manageable FLM SOC are essential to ensure exemplary job and unit outcomes. Core self-evaluation is a personality characteristic that may enhance manager performance in the face of high spans of control. © 2013 John Wiley & Sons Ltd.

  19. Nurse managers' experience with ethical issues in six government hospitals in Malaysia: a cross-sectional study.

    PubMed

    Musa, Maizura binti; Harun-Or-Rashid, M D; Sakamoto, Junichi

    2011-11-16

    Nurse managers have the burden of experiencing frequent ethical issues related to both their managerial and nursing care duties, according to previous international studies. However, no such study was published in Malaysia. The purpose of this study was to explore nurse managers' experience with ethical issues in six government hospitals in Malaysia including learning about the way they dealt with the issues. A cross-sectional study was conducted in August-September, 2010 involving 417 (69.2%) of total 603 nurse managers in the six Malaysian government hospitals. Data were collected using three-part self-administered questionnaire. Part I was regarding participants' demographics. Part II was about the frequency and areas of management where ethical issues were experienced, and scoring of the importance of 11 pre-identified ethical issues. Part III asked how they dealt with ethical issues in general; ways to deal with the 11 pre-identified ethical issues, and perceived stress level. Data were analyzed using descriptive statistics, cross-tabulations and Pearson's Chi-square. A total of 397 (95.2%) participants experienced ethical issues and 47.2% experienced them on weekly to daily basis. Experiencing ethical issues were not associated with areas of practice. Top area of management where ethical issues were encountered was "staff management", but "patient care" related ethical issues were rated as most important. Majority would "discuss with other nurses" in dealing generally with the issues. For pre-identified ethical issues regarding "patient care", "discuss with doctors" was preferred. Only 18.1% referred issues to "ethics committees" and 53.0% to the code of ethics. Nurse managers, regardless of their areas of practice, frequently experienced ethical issues. For dealing with these, team-approach needs to be emphasized. Proper understanding of the code of ethics is needed to provide basis for reasoning.

  20. Leadership, governance and management in dental education - new societal challenges.

    PubMed

    Townsend, G; Thomas, R; Skinner, V; Bissell, V; Cohen, L; Cowpe, J; Giuliani, M; Gomez-Roman, G; Hovland, E; Imtiaz, A; Kalkwarf, K; Kim, K-K; Lamster, I; Marley, J; Mattsson, L; Paganelli, C; Quintao, C; Swift, J; Thirawat, J; Williams, J; Soekanto, S; Jones, M

    2008-02-01

    Dental schools around the world face new challenges that raise issues with regard to how they are governed, led and managed. With rapid societal changes, including globalization and consumerism, the roles of universities and their funding have become intensely debated topics. When financial burdens on universities increase, so does the pressure on dental schools. This is exacerbated by the relative expense of running dental schools and also by the limited understanding of both university managers and the public of the nature and scope of dentistry as a profession. In these circumstances, it is essential for dental schools to have good systems of leadership and management in place so that they can not only survive in difficult times, but flourish in the longer term. This paper discusses the concept of governance and how it relates to leadership, management and administration in dental schools and hospitals. Various approaches to governance and management in dental schools on different continents and regions are summarized and contrasted. A number of general governance and leadership issues are addressed. For example, a basic principle supported by the Working Group is that an effective governance structure must link authority and responsibility to performance and review, i.e. accountability, and that the mechanism for achieving this should be transparent. The paper also addresses issues specific to governing, leading and managing dental schools. Being a dean of a modern dental school is a very demanding role and some issues relating to this role are raised, including: dilemmas facing deans, preparing to be dean and succession planning. The importance of establishing a shared vision and mission, and creating the right culture and climate within a dental school, are emphasized. The Working Group advocates establishing a culture of scholarship in dental schools for both teaching and research. The paper addresses the need for effective staff management, motivation and development, and highlights the salience of good communication. The Working Group suggests establishing an advisory board to the dean and school, including lay persons and other external stakeholders, as one way of separating governance and management to some extent and providing some checks and balances within a dental school. Several other suggestions and recommendations are made about governance, management and leadership issues, including the need for schools to promote an awareness of their roles by good communication and thereby influence perceptions of others about their roles and values.

  1. An investigation of transitional management problems for the NSTS

    NASA Technical Reports Server (NTRS)

    Hunsucker, John L.; Law, Japhet S.

    1987-01-01

    Analysis and recommendations were provided to the National Space Transportation System (NSTS) on managing the transition from a research and development (R/D) structure to an operational structure. Summaries of published literature on the theory and applications of transition, or change management, and the results of interviews with additional industry personnel whose organizations either have gone through or are now going through change are contained. The issues of flight rates and the flight decision are addressed. The use of a computer simulation model to analyze the effect of varying different parameters on the flight rate was also discussed. The issue of NASA's changing demographics was examined and why this may be a cause for concern. The impact of the whole shuttle system structure on the Challenger accident was presented along with the highlights of the Rogers Commission Report. The proposed reorganization of the NSTS management structure is discussed and how this transition from R/D to operations can be performed.

  2. Analysis of post-mining excavations as places for municipal waste

    NASA Astrophysics Data System (ADS)

    Górniak-Zimroz, Justyna

    2018-01-01

    Waste management planning is an interdisciplinary task covering a wide range of issues including costs, legal requirements, spatial planning, environmental protection, geography, demographics, and techniques used in collecting, transporting, processing and disposing of waste. Designing and analyzing this issue is difficult and requires the use of advanced analysis methods and tools available in GIS geographic information systems containing readily available graphical and descriptive databases, data analysis tools providing expert decision support while selecting the best-designed alternative, and simulation models that allow the user to simulate many variants of waste management together with graphical visualization of the results of performed analyzes. As part of the research study, there have been works undertaken concerning the use of multi-criteria data analysis in waste management in areas located in southwestern Poland. These works have proposed the inclusion in waste management of post-mining excavations as places for the final or temporary collection of waste assessed in terms of their suitability with the tools available in GIS systems.

  3. Geographic Information System (GIS) capabilities in traffic accident information management: a qualitative approach.

    PubMed

    Ahmadi, Maryam; Valinejadi, Ali; Goodarzi, Afshin; Safari, Ameneh; Hemmat, Morteza; Majdabadi, Hesamedin Askari; Mohammadi, Ali

    2017-06-01

    Traffic accidents are one of the more important national and international issues, and their consequences are important for the political, economical, and social level in a country. Management of traffic accident information requires information systems with analytical and accessibility capabilities to spatial and descriptive data. The aim of this study was to determine the capabilities of a Geographic Information System (GIS) in management of traffic accident information. This qualitative cross-sectional study was performed in 2016. In the first step, GIS capabilities were identified via literature retrieved from the Internet and based on the included criteria. Review of the literature was performed until data saturation was reached; a form was used to extract the capabilities. In the second step, study population were hospital managers, police, emergency, statisticians, and IT experts in trauma, emergency and police centers. Sampling was purposive. Data was collected using a questionnaire based on the first step data; validity and reliability were determined by content validity and Cronbach's alpha of 75%. Data was analyzed using the decision Delphi technique. GIS capabilities were identified in ten categories and 64 sub-categories. Import and process of spatial and descriptive data and so, analysis of this data were the most important capabilities of GIS in traffic accident information management. Storing and retrieving of descriptive and spatial data, providing statistical analysis in table, chart and zoning format, management of bad structure issues, determining the cost effectiveness of the decisions and prioritizing their implementation were the most important capabilities of GIS which can be efficient in the management of traffic accident information.

  4. Quality Control Review of the Defense Contract Management Agency Internal Review Audit Function

    DTIC Science & Technology

    2013-04-18

    DMI-2011-001, “Audit of DCMA Telework Program,” November 29, 2011, we identified issues with independence. For the Audit of DCMA Telework Program...and Audit of DCMA Telework Program, we identified issues with audit planning. Specifically, we found that both audits did not include documentation...of fraud risks had been performed during audit planning. For the audit of the DCMA Telework Program, steps were added to the audit program to

  5. Challenges of Digital Preservation for Cultural Heritage Institutions

    ERIC Educational Resources Information Center

    Evens, Tom; Hauttekeete, Laurence

    2011-01-01

    This article elaborates four major issues hampering the sustainability of digital preservation within cultural heritage institutions: digitization, metadata indexes, intellectual property rights management and business models. Using a case-study approach, the digitization of audiovisual collections within the performing arts institutions in…

  6. Managing Innovation in Academic Libraries.

    ERIC Educational Resources Information Center

    Drake, Miriam A.

    1979-01-01

    Explores key issues related to innovation in academic libraries--performance gaps, incentives to innovate, nature of innovation, barriers and constraints, impact of innovation, and implementation of innovative strategies--and concludes that innovation requires a conducive climate, capital investment, and a leadership that is enthusiastic and…

  7. Useful measures and models for analytical quality management in medical laboratories.

    PubMed

    Westgard, James O

    2016-02-01

    The 2014 Milan Conference "Defining analytical performance goals 15 years after the Stockholm Conference" initiated a new discussion of issues concerning goals for precision, trueness or bias, total analytical error (TAE), and measurement uncertainty (MU). Goal-setting models are critical for analytical quality management, along with error models, quality-assessment models, quality-planning models, as well as comprehensive models for quality management systems. There are also critical underlying issues, such as an emphasis on MU to the possible exclusion of TAE and a corresponding preference for separate precision and bias goals instead of a combined total error goal. This opinion recommends careful consideration of the differences in the concepts of accuracy and traceability and the appropriateness of different measures, particularly TAE as a measure of accuracy and MU as a measure of traceability. TAE is essential to manage quality within a medical laboratory and MU and trueness are essential to achieve comparability of results across laboratories. With this perspective, laboratory scientists can better understand the many measures and models needed for analytical quality management and assess their usefulness for practical applications in medical laboratories.

  8. A management-control system to assist with the development, contracting, and monitoring of new services for older people: you can always get what you want (with apologies to the Rolling Stones).

    PubMed

    Jacobs, Stephen

    2007-10-01

    Implementing community services can be a very complex process where people end up "not seeing the wood for the trees" and then accepting a compromise nobody wants. Neither agency theory nor stewardship theory is particularly robust when explaining the reality that funders and managers of community health service for older people face in managing contracts. There are particular difficulties with goal divergence between policy directives and implementation practices, which result from goals not being well understood and performance requirements being ambiguously defined and infrequently monitored. This leads to accountability issues for public managers, and raises efficiency and effectiveness issues. This paper provides an interim report on a project developing a management-control system to provide a process for health planners and funders to use when developing and contracting services. A major focus is inviting stakeholders into a process of communication that ensures that they have shared understandings of where they want to get to, and what has to be done to get there.

  9. Traffic Management in ATM Networks Over Satellite Links

    NASA Technical Reports Server (NTRS)

    Goyal, Rohit; Jain, Raj; Goyal, Mukul; Fahmy, Sonia; Vandalore, Bobby; vonDeak, Thomas

    1999-01-01

    This report presents a survey of the traffic management Issues in the design and implementation of satellite Asynchronous Transfer Mode (ATM) networks. The report focuses on the efficient transport of Transmission Control Protocol (TCP) traffic over satellite ATM. First, a reference satellite ATM network architecture is presented along with an overview of the service categories available in ATM networks. A delay model for satellite networks and the major components of delay and delay variation are described. A survey of design options for TCP over Unspecified Bit Rate (UBR), Guaranteed Frame Rate (GFR) and Available Bit Rate (ABR) services in ATM is presented. The main focus is on traffic management issues. Several recommendations on the design options for efficiently carrying data services over satellite ATM networks are presented. Most of the results are based on experiments performed on Geosynchronous (GEO) latencies. Some results for Low Earth Orbits (LEO) and Medium Earth Orbit (MEO) latencies are also provided.

  10. Sustainability issues in rural water supply in Asia.

    PubMed

    1998-03-01

    This article identifies some sustainability issues in management of water supplies in rural Asia. The International Drinking Water Supply and Sanitation Decade was 1981-90. At present, less than 50% of the rural population in several Asian countries have access to safe water, and even less have access to adequate sanitation. Access does not ensure quality of services or supplies. Data on coverage is inadequate and does not take into account water quality, hours of service, reliability of supplies, distance to the source, and community use patterns. It is difficult to improve access to the poor. There is no single uniform strategy that works for all parts of a country. Countries need to promote community management that has strategic vision and appropriate priorities. Local management is constrained by centralized authority, the orientation of sector agencies, and staff with weak managerial, financial, technical, and communications skills. Many countries lack resources to maintain water delivery infrastructures and to prevent deterioration of services. There is a need to develop low cost appropriate technologies, management requirements, health education, community participation, mobilization of women, and synergistic, nonsequential development. Demand for water and sanitation is driven by survival and privacy issues. Rural water supply programs should view water as an economic and social good. Water management is effective when decisions are made locally. Local governments need to be strengthened in order to be able to perform demand management, select institutional options, and to take care of the unserviced.

  11. Photovoltaic system criteria documents. Volume 1: Guidelines for evaluating the management and operations planning of photovoltaic applications

    NASA Technical Reports Server (NTRS)

    Koenig, John C.; Billitti, Joseph W.; Tallon, John M.

    1979-01-01

    Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).

  12. Configuration management issues and objectives for a real-time research flight test support facility

    NASA Technical Reports Server (NTRS)

    Yergensen, Stephen; Rhea, Donald C.

    1988-01-01

    An account is given of configuration management activities for the Western Aeronautical Test Range (WATR) at NASA-Ames, whose primary function is the conduct of aeronautical research flight testing through real-time processing and display, tracking, and communications systems. The processing of WATR configuration change requests for specific research flight test projects must be conducted in such a way as to refrain from compromising the reliability of WATR support to all project users. Configuration management's scope ranges from mission planning to operations monitoring and performance trend analysis.

  13. Leveraging People-Related Maturity Issues for Achieving Higher Maturity and Capability Levels

    NASA Astrophysics Data System (ADS)

    Buglione, Luigi

    During the past 20 years Maturity Models (MM) become a buzzword in the ICT world. Since the initial Crosby's idea in 1979, plenty of models have been created in the Software & Systems Engineering domains, addressing various perspectives. By analyzing the content of the Process Reference Models (PRM) in many of them, it can be noticed that people-related issues have little weight in the appraisals of the capabilities of organizations while in practice they are considered as significant contributors in traditional process and organizational performance appraisals, as stressed instead in well-known Performance Management models such as MBQA, EFQM and BSC. This paper proposes some ways for leveraging people-related maturity issues merging HR practices from several types of maturity models into the organizational Business Process Model (BPM) in order to achieve higher organizational maturity and capability levels.

  14. An architecture for automated fault diagnosis. [Space Station Module/Power Management And Distribution

    NASA Technical Reports Server (NTRS)

    Ashworth, Barry R.

    1989-01-01

    A description is given of the SSM/PMAD power system automation testbed, which was developed using a systems engineering approach. The architecture includes a knowledge-based system and has been successfully used in power system management and fault diagnosis. Architectural issues which effect overall system activities and performance are examined. The knowledge-based system is discussed along with its associated automation implications, and interfaces throughout the system are presented.

  15. Management and Rehabilitation of Joint Disease in Sport Horses.

    PubMed

    Contino, Erin K

    2018-05-21

    Joint disease is one of the most common issues effecting sport horses. Because there is no cure for joint disease, treatment goals surround slowing progression of the disease, minimizing pain, increasing function, and optimizing performance. Accomplishing these goals often requires a multimodal approach that combines systemic medications or supplements; intra-articular therapies, such as corticosteroids or biologics; management considerations; and physical therapy exercises. Copyright © 2018 Elsevier Inc. All rights reserved.

  16. Air Force Audit Agency Management Information System

    DTIC Science & Technology

    1990-11-01

    Support Directorate. AFAA/QL performs multilocation . Air Force-wide audits and issues reports to the SAF. It, however, specializes in the multibillion...USE ONLY (Leave blank) 2. REPORT DATE 3. REPORT TYPE AND DATES COVERED NOV 90 4. TITLE AND SUBTITLE S. FUNDING NUMBERS Air Force Audit Agency...appreciated. Mail them to: CADRE/RI, Building 1400, Maxwell AFB AL 36112-5532.• Air Force Audit Agency Management Hobbs Information System C 0* 0 0

  17. Overactive Bladder Syndrome: Evaluation and Management.

    PubMed

    Leron, Elad; Weintraub, Adi Y; Mastrolia, Salvatore A; Schwarzman, Polina

    2018-03-01

    Overactive bladder (OAB) syndrome is a chronic medical condition which has a major influence on the quality of life in a significant amount of the population. OAB affects performance of daily activities and has an estimated prevalence of 16.5%. Many sufferers do not seek medical help. Moreover, many family physicians and even gynecologists are not familiar with this issue. Usually patients suffer from OAB in advanced age. Nocturia is reported as the most bothersome symptom in the elderly population. The aim of our review was to discuss all aspects of this challenging disorder and suggest tools for assessment and management strategies. Practitioners can easily overlook urinary complains if they not directly queried. We would like to encourage practitioners to give more attention to this issue.

  18. 75 FR 22706 - Defense Federal Acquisition Regulation Supplement; Service Contract Surveillance (DFARS Case 2008...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ...DoD is issuing a final rule amending the Defense Federal Acquisition Regulation Supplement (DFARS) to ensure that the requirement for a quality assurance surveillance plan is addressed for each contract with a dollar value above the simplified acquisition threshold, and that contracts for services have appropriate performance management or surveillance plans prepared for the work being performed under the contract.

  19. 75 FR 73987 - Target Date Disclosure

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-30

    ... (Commission) held a joint public hearing to explore issues related to TDFs, including how they are managed at... principal strategies (including a general description of the types of assets held by the investment), and... goals, principal strategies and principal risks, historical performance, and fees and expenses, the...

  20. 7 CFR 275.7 - Selection of sub-units for review.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM PERFORMANCE REPORTING SYSTEM Management Evaluation (ME... Food Stamp Program, exclusive of Post Offices which may issue coupons. Sub-units shall be classified...

  1. 7 CFR 800.161 - Official certificate requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... applicable; (12) the results of the service performed; (13) the location of the issuing office; (14) the... Service shall be used for all export grain. (Approved by the Office of Management and Budget under control... STOCKYARD ADMINISTRATION (FEDERAL GRAIN INSPECTION SERVICE), DEPARTMENT OF AGRICULTURE GENERAL REGULATIONS...

  2. Creating Competence: Perspectives and Practices in Organizations.

    ERIC Educational Resources Information Center

    Mulder, Martin

    Creating competence has become a major issue in organizations. Various authors contend that competency management has the potential of integrating organizational strategy, human-resource instruments, and human-resource development; that competency development can lead to performance improvement; and that it can help Human Resource Development…

  3. 77 FR 2714 - National Petroleum Council

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-19

    ... two-year period, beginning January 12, 2012. The Council will provide advice and recommendations to... the Department's business and to be in the public interest in connection with the performance of.... Issued at Washington, DC, on January 12, 2012. Carol A. Matthews, Committee Management Officer. [FR Doc...

  4. Towards stable and commercially available perovskite solar cells

    DOE PAGES

    Park, Nam-Gyu; Grätzel, Michael; Miyasaka, Tsutomu; ...

    2016-10-17

    Solar cells employing a halide perovskite with an organic cation now show power conversion efficiency of up to 22%. But, these cells are facing issues towards commercialization, such as the need to achieve long-term stability and the development of a manufacturing method for the reproducible fabrication of high-performance devices. We propose a strategy to obtain stable and commercially viable perovskite solar cells. A reproducible manufacturing method is suggested, as well as routes to manage grain boundaries and interfacial charge transport. Electroluminescence is regarded as a metric to gauge theoretical efficiency. We highlight how optimizing the design of device architectures ismore » important not only for achieving high efficiency but also for hysteresis-free and stable performance. Here, we argue that reliable device characterization is needed to ensure the advance of this technology towards practical applications. We believe that perovskite-based devices can be competitive with silicon solar modules, and discuss issues related to the safe management of toxic material.« less

  5. Greening MSW management systems by saving footprint: The contribution of the waste transportation.

    PubMed

    Peri, G; Ferrante, P; La Gennusa, M; Pianello, C; Rizzo, G

    2018-08-01

    Municipal solid waste (MSW) management constitutes a highly challenging issue to cope with in order of moving towards more sustainable urban policies. Despite new Standards call for recycling and reusing materials contained in the urban waste, several municipalities still use landfilling as a waste disposal method. Other than the environmental pressure exerted by these plants, waste transportation from the collection points to the landfill needs a specific attention to correctly assess the whole burden of the waste management systems. In this paper, the Ecological Footprint (EF) indicator is applied to the actual MSW of the city of Palermo (Sicily). Results show that the effects produced by the involved transportation vehicles are not negligible, compared to those generated by the other segments of the waste management system. This issue is further deepened by analysing the role of transportation in an upgraded waste management system that is represented by the newly designed waste management plan of Palermo. The computed saved ecological footprint is used here for suitably comparing the environmental performances of the MSW system in both scenarios. Finally, the suitability of the EF method to address not only complete waste management plans but also single segments of the waste management system, is also discussed. Copyright © 2018 Elsevier Ltd. All rights reserved.

  6. Clinical management issues vary by specialty in the Victorian Audit of Surgical Mortality: a retrospective observational study

    PubMed Central

    Vinluan, Jessele; Retegan, Claudia; Chen, Andrew; Beiles, Charles Barry

    2014-01-01

    Objective Clinical management issues are contributory factors to mortality. The aim of this study was to use data from the Victorian Audit of Surgical Mortality (VASM), an educational peer-review process for surgeons, to discover differences in the incidence of these issues between surgical specialties in order to focus attention to areas of care that might be improved. Design This study used retrospectively analysed observational data from VASM. Clinical management issues between eight specialties were assessed using χ2 analysis. Data sources VASM data were reported by participating public and private health services, the Coroner and self-reporting surgeons across Victoria. Results A total of 2946 specific clinical issues as deficiencies of care were reported. 15% of cases had significant issues of care. The most common clinical management issue was the delay in delivery of treatment. Other clinical issues included the quality of communication and documentation, preoperative and postoperative care, adverse events and protocol issues. There were significant differences in issues between specialties. Conclusions The clinical management issues presented across surgical specialties were similar; however, five issues of clinical care differed significantly in frequency across surgical specialties. The three main issues varying among specialties were complications after operation, communication and postoperative care. Addressing these clinical management issues via the peer-review process may impact positively on patient care. PMID:24980043

  7. A life cycle model of public policy issues in health care: the importance of strategic issues management.

    PubMed

    Rakich, J S; Feit, M D

    2001-01-01

    Public policy affects health and social services organizations. Senior management has a responsibility to prevent inappropriate demands of stakeholders from predominating and to influence the outcome of public policy to the benefit of their organization through the strategic issues management process. This article presents a public policy issue life cycle model, life-cycle stages and suggested strategies, paths issues can take in the life cycle, and factors that affect issue paths. An understanding of these dynamics can aid senior managers in shaping and changing public policy issues and lessening external environment threats to their organization.

  8. Conflict Resolution Performance in an Experimental Study of En Route Free Maneuvering Operations

    NASA Technical Reports Server (NTRS)

    Doble, Nathan A.; Barhydt, Richard; Hitt, James M., II

    2005-01-01

    NASA has developed a far-term air traffic management concept, termed Distributed Air/Ground Traffic Management (DAG-TM). One component of DAG-TM, En Route Free Maneuvering, allows properly trained flight crews of equipped autonomous aircraft to assume responsibility for separation from other autonomous aircraft and from Instrument Flight Rules (IFR) aircraft. Ground-based air traffic controllers continue to separate IFR traffic and issue flow management constraints to all aircraft. To examine En Route Free Maneuvering operations, a joint human-in-the-loop experiment was conducted in summer 2004 at the NASA Ames and Langley Research Centers. Test subject pilots used desktop flight simulators to resolve traffic conflicts and adhere to air traffic flow constraints issued by subject controllers. The experimental airspace integrated both autonomous and IFR aircraft at varying traffic densities. This paper presents a subset of the En Route Free Maneuvering experimental results, focusing on airborne and ground-based conflict resolution, and the effects of increased traffic levels on the ability of pilots and air traffic controllers to perform this task. The results show that, in general, increases in autonomous traffic do not significantly impact conflict resolution performance. In addition, pilot acceptability of autonomous operations remains high throughout the range of traffic densities studied. Together with previously reported findings, these results continue to support the feasibility of the En Route Free Maneuvering component of DAG-TM.

  9. Nurse managers' experience with ethical issues in six government hospitals in Malaysia: A cross-sectional study

    PubMed Central

    2011-01-01

    Background Nurse managers have the burden of experiencing frequent ethical issues related to both their managerial and nursing care duties, according to previous international studies. However, no such study was published in Malaysia. The purpose of this study was to explore nurse managers' experience with ethical issues in six government hospitals in Malaysia including learning about the way they dealt with the issues. Methods A cross-sectional study was conducted in August-September, 2010 involving 417 (69.2%) of total 603 nurse managers in the six Malaysian government hospitals. Data were collected using three-part self-administered questionnaire. Part I was regarding participants' demographics. Part II was about the frequency and areas of management where ethical issues were experienced, and scoring of the importance of 11 pre-identified ethical issues. Part III asked how they dealt with ethical issues in general; ways to deal with the 11 pre-identified ethical issues, and perceived stress level. Data were analyzed using descriptive statistics, cross-tabulations and Pearson's Chi-square. Results A total of 397 (95.2%) participants experienced ethical issues and 47.2% experienced them on weekly to daily basis. Experiencing ethical issues were not associated with areas of practice. Top area of management where ethical issues were encountered was "staff management", but "patient care" related ethical issues were rated as most important. Majority would "discuss with other nurses" in dealing generally with the issues. For pre-identified ethical issues regarding "patient care", "discuss with doctors" was preferred. Only 18.1% referred issues to "ethics committees" and 53.0% to the code of ethics. Conclusions Nurse managers, regardless of their areas of practice, frequently experienced ethical issues. For dealing with these, team-approach needs to be emphasized. Proper understanding of the code of ethics is needed to provide basis for reasoning. PMID:22085735

  10. Team-based efforts to improve quality of care, the fundamental role of ethics, and the responsibility of health managers: monitoring and management strategies to enhance teamwork.

    PubMed

    Kossaify, A; Hleihel, W; Lahoud, J-C

    2017-12-01

    Highlight the importance of teamwork in health care institutions by performing a review and discussion of the relevant literature. Review paper. A MEDLINE/Pubmed search was performed starting from 1990, and the terms 'team, teamwork, managers, healthcare, and cooperation' were searched in titles, abstracts, keywords, and conclusions; other terms 'patient safety, ethics, audits and quality of care' were specifically searched in abstracts and were used as additional filters criteria to select relevant articles. Thirty-three papers were found relevant; factors affecting the quality of care in health care institutions are multiple and varied, including issues related to individual profile, to administrative structure and to team-based effort. Issues affecting teamwork include mainly self-awareness, work environment, leadership, ethics, cooperation, communication, and competition. Moreover, quality improvement plans aiming to enhance and expand teams are essential in this context. Team monitoring and management are vital to achieve efficient teamwork with all the required qualities for a safer health system. In all cases, health managers' responsibility plays a fundamental role in creating and sustaining a teamwork atmosphere. Teamwork is known to improve outcomes in medicine, whether at the clinical, organizational, or scientific level. Teamwork in health care institutions must increasingly be encouraged, given that individual effort is often insufficient for optimal clinical outcome. Copyright © 2017 The Royal Society for Public Health. Published by Elsevier Ltd. All rights reserved.

  11. 7 CFR 1494.101 - General statement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... (Invitation). Invitations will be issued pursuant to this subpart by the General Sales Manager (GSM) and will... specifications), the eligible buyer(s), the method and rate for determining liquidated damages and performance... one of the following two types: Those inviting exporters which have a sales contract with an eligible...

  12. Revitalizing Higher Education. Issues in Higher Education, Volume 3. First Edition.

    ERIC Educational Resources Information Center

    Salmi, Jamil, Ed.; Verspoor, Adriaan M., Ed.

    This volume contains 13 papers on experiences with reform and innovation in higher education and their implications for developing countries. Four themes are highlighted: higher education and development, performance assessment, sustainable financing, and effectiveness in governance and management. The papers include: "Introduction:…

  13. MINE WASTE TECHNOLOGY PROGRAM:HISTORICAL PERSPECTIVES. CURRENT HIGHLIGHTS, FUTURE OPPORTUNITIES

    EPA Science Inventory

    For the past 13 years, the Mine Waste Technology Program has been technically driven by the National Risk Management Research Lab. A portion of the MWTP funding has been used to perform field demonstrations of innovative technologies with the potential to address mine waste issue...

  14. The Unintended Consequences of Grading Teaching

    ERIC Educational Resources Information Center

    Smith, Holly

    2012-01-01

    This article examines the possibility of a "Teaching Assessment Exercise" and attempts to quantify teaching quality as part of performance management schemes for academics. The primary sources of data are identified as student evaluation of teaching (SET) and peer observation of teaching (POT). The conceptual and empirical issues in…

  15. INFLUENCE OF DIET ON THE PERFORMANCE OF BOVINE FECAL POLLUTION DETECTION METHODS AND MICROBIAL POPULATION STRUCTURE

    EPA Science Inventory

    ABSTRACT Background and Aims. Waterborne diseases originating from bovine fecal material are a significant public health issue. Ensuring water quality requires the use of methods that can consistently identify pollution across a broad range of management practices. One practi...

  16. Addressing chronic operational issues at the W. M. Keck Observatory

    NASA Astrophysics Data System (ADS)

    Nordin, Tom; Matsuda, Richard

    2016-07-01

    The W. M. Keck Observatory (WMKO) has a good track record at addressing large critical faults which impact observing. Our performance tracking and correcting chronic minor faults has been mixed, yet this class of problems has a significant negative impact on scientific productivity and staff effectiveness. We have taken steps to address this shortcoming. This paper outlines the creation of a program to identify, categorize and rank these chronic operational issues, track them over time, and develop management options for their resolution. The success of the program at identifying these chronic operational issues and the advantages of dedicating observatory resources to this endeavor are presented.

  17. Individual performance review in hospital practice: the development of a framework and evaluation of doctors' attitudes to its value and implementation.

    PubMed

    Trebble, T M; Cruickshank, L; Hockey, P M; Heyworth, N; Powell, T; Clarke, N

    2013-11-01

    Appraisal, or independent performance review (IPR) is used in human resources management in the commercial and public sectors to evaluate the performance of an employee against agreed local organisational expectations and objectives, and to identify their requirements for development and effective management. IPR for NHS consultants may provide essential information for job planning, contribute towards medical appraisal for revalidation, and facilitate productivity and quality improvement. To develop a framework for IPR for consultants, and to determine attitudes on its value, process and content. Information from commercial, public and voluntary sector models and published and other literature sources were used to develop an IPR framework. This was assessed through a three-cycle action research methodology involving qualitative interviews with 22 consultants (predominantly with medical management roles). The domains of the IPR framework included: (1) performance against objectives; (2) behaviour and leadership; (3) talent management; (4) agreed future objectives. A number of themes were identified from the consultant interviews including: ineffective current appraisal systems reflecting a lack of valid performance data and allotted time; a lack of empowerment of medical managers to address performance issues; IPR as a more explicit system, offering value in evaluating doctors performance; and the dependence of successful implementation on the engagement of the Trust executive. IPR may have value for performance evaluation of consultants, contributing toward job planning and complementing medical appraisal. Support by their employing organisation and engagement with medical managers in design and implementation is likely to be essential.

  18. Determinants of business sustainability: an ergonomics perspective.

    PubMed

    Genaidy, Ash M; Sequeira, Reynold; Rinder, Magda M; A-Rehim, Amal D

    2009-03-01

    There is a need to integrate both macro- and micro-ergonomic approaches for the effective implementation of interventions designed to improve the root causes of problems such as work safety, quality and productivity in the enterprise system. The objective of this study was to explore from an ergonomics perspective the concept of business sustainability through optimising the worker-work environment interface. The specific aims were: (a) to assess the working conditions of a production department work process with the goal to jointly optimise work safety, quality and quantity; (b) to evaluate the enterprise-wide work process at the system level as a social entity in an attempt to trace the root causes of ergonomic issues impacting employees throughout the work process. The Work Compatibility Model was deployed to examine the experiences of workers (that is, effort, perceived risk/benefit, performance and satisfaction/dissatisfaction or psychological impact) and their associations with the complex domains of the work environment (task content, physical and non-physical work environment and conditions for learning/growth/development). This was followed by assessment of the enterprise system through detailed interviews with department managers and lead workers. A system diagnostic instrument was also constructed from information derived from the published literature to evaluate the enterprise system performance. The investigation of the production department indicated that the stress and musculoskeletal pain experienced by workers (particularly on the day shift) were derived from sources elsewhere in the work process. The enterprise system evaluation and detailed interviews allowed the research team to chart the feed-forward and feedback stress propagation loops in the work system. System improvement strategies were extracted on the basis of tacit/explicit knowledge obtained from department managers and lead workers. In certain situations concerning workplace human performance issues, a combined macro-micro ergonomic methodology is essential to solve the productivity, quality and safety issues impacting employees along the trajectory or path of the enterprise-wide work process. In this study, the symptoms associated with human performance issues in one production department work process had root causes originating in the customer service department work process. In fact, the issues found in the customer service department caused performance problems elsewhere in the enterprise-wide work process such as the traffic department. Sustainable enterprise solutions for workplace human performance require the integration of macro- and micro-ergonomic approaches.

  19. Error management for musicians: an interdisciplinary conceptual framework

    PubMed Central

    Kruse-Weber, Silke; Parncutt, Richard

    2014-01-01

    Musicians tend to strive for flawless performance and perfection, avoiding errors at all costs. Dealing with errors while practicing or performing is often frustrating and can lead to anger and despair, which can explain musicians’ generally negative attitude toward errors and the tendency to aim for flawless learning in instrumental music education. But even the best performances are rarely error-free, and research in general pedagogy and psychology has shown that errors provide useful information for the learning process. Research in instrumental pedagogy is still neglecting error issues; the benefits of risk management (before the error) and error management (during and after the error) are still underestimated. It follows that dealing with errors is a key aspect of music practice at home, teaching, and performance in public. And yet, to be innovative, or to make their performance extraordinary, musicians need to risk errors. Currently, most music students only acquire the ability to manage errors implicitly – or not at all. A more constructive, creative, and differentiated culture of errors would balance error tolerance and risk-taking against error prevention in ways that enhance music practice and music performance. The teaching environment should lay the foundation for the development of such an approach. In this contribution, we survey recent research in aviation, medicine, economics, psychology, and interdisciplinary decision theory that has demonstrated that specific error-management training can promote metacognitive skills that lead to better adaptive transfer and better performance skills. We summarize how this research can be applied to music, and survey-relevant research that is specifically tailored to the needs of musicians, including generic guidelines for risk and error management in music teaching and performance. On this basis, we develop a conceptual framework for risk management that can provide orientation for further music education and musicians at all levels. PMID:25120501

  20. Error management for musicians: an interdisciplinary conceptual framework.

    PubMed

    Kruse-Weber, Silke; Parncutt, Richard

    2014-01-01

    Musicians tend to strive for flawless performance and perfection, avoiding errors at all costs. Dealing with errors while practicing or performing is often frustrating and can lead to anger and despair, which can explain musicians' generally negative attitude toward errors and the tendency to aim for flawless learning in instrumental music education. But even the best performances are rarely error-free, and research in general pedagogy and psychology has shown that errors provide useful information for the learning process. Research in instrumental pedagogy is still neglecting error issues; the benefits of risk management (before the error) and error management (during and after the error) are still underestimated. It follows that dealing with errors is a key aspect of music practice at home, teaching, and performance in public. And yet, to be innovative, or to make their performance extraordinary, musicians need to risk errors. Currently, most music students only acquire the ability to manage errors implicitly - or not at all. A more constructive, creative, and differentiated culture of errors would balance error tolerance and risk-taking against error prevention in ways that enhance music practice and music performance. The teaching environment should lay the foundation for the development of such an approach. In this contribution, we survey recent research in aviation, medicine, economics, psychology, and interdisciplinary decision theory that has demonstrated that specific error-management training can promote metacognitive skills that lead to better adaptive transfer and better performance skills. We summarize how this research can be applied to music, and survey-relevant research that is specifically tailored to the needs of musicians, including generic guidelines for risk and error management in music teaching and performance. On this basis, we develop a conceptual framework for risk management that can provide orientation for further music education and musicians at all levels.

  1. On the Modeling and Management of Cloud Data Analytics

    NASA Astrophysics Data System (ADS)

    Castillo, Claris; Tantawi, Asser; Steinder, Malgorzata; Pacifici, Giovanni

    A new era is dawning where vast amount of data is subjected to intensive analysis in a cloud computing environment. Over the years, data about a myriad of things, ranging from user clicks to galaxies, have been accumulated, and continue to be collected, on storage media. The increasing availability of such data, along with the abundant supply of compute power and the urge to create useful knowledge, gave rise to a new data analytics paradigm in which data is subjected to intensive analysis, and additional data is created in the process. Meanwhile, a new cloud computing environment has emerged where seemingly limitless compute and storage resources are being provided to host computation and data for multiple users through virtualization technologies. Such a cloud environment is becoming the home for data analytics. Consequently, providing good performance at run-time to data analytics workload is an important issue for cloud management. In this paper, we provide an overview of the data analytics and cloud environment landscapes, and investigate the performance management issues related to running data analytics in the cloud. In particular, we focus on topics such as workload characterization, profiling analytics applications and their pattern of data usage, cloud resource allocation, placement of computation and data and their dynamic migration in the cloud, and performance prediction. In solving such management problems one relies on various run-time analytic models. We discuss approaches for modeling and optimizing the dynamic data analytics workload in the cloud environment. All along, we use the Map-Reduce paradigm as an illustration of data analytics.

  2. Prognostics and health management of photovoltaic systems

    DOEpatents

    Johnson, Jay; Riley, Daniel

    2018-04-10

    The various technologies presented herein relate to providing prognosis and health management (PHM) of a photovoltaic (PV) system. A PV PHM system can eliminate long-standing issues associated with detecting performance reduction in PV systems. The PV PHM system can utilize an ANN model with meteorological and power input data to facilitate alert generation in the event of a performance reduction without the need for information about the PV PHM system components and design. Comparisons between system data and the PHM model can provide scheduling of maintenance on an as-needed basis. The PHM can also provide an approach for monitoring system/component degradation over the lifetime of the PV system.

  3. The role of behavioral decision theory for cockpit information management

    NASA Technical Reports Server (NTRS)

    Jonsson, Jon E.

    1991-01-01

    The focus of this report is the consideration of one form of cognition, judgment and decision making, while examining some information management issues associated with the implementation of new forms of automation. As technology matures and more tasks become suitable to automation, human factors researchers will have to consider the effect that increasing automation will have on operator performance. Current technology allows flight deck designers the opportunity to automate activities involving substantially more cognitive processing.

  4. Geographic Information System (GIS) capabilities in traffic accident information management: a qualitative approach

    PubMed Central

    Ahmadi, Maryam; Valinejadi, Ali; Goodarzi, Afshin; Safari, Ameneh; Hemmat, Morteza; Majdabadi, Hesamedin Askari; Mohammadi, Ali

    2017-01-01

    Background Traffic accidents are one of the more important national and international issues, and their consequences are important for the political, economical, and social level in a country. Management of traffic accident information requires information systems with analytical and accessibility capabilities to spatial and descriptive data. Objective The aim of this study was to determine the capabilities of a Geographic Information System (GIS) in management of traffic accident information. Methods This qualitative cross-sectional study was performed in 2016. In the first step, GIS capabilities were identified via literature retrieved from the Internet and based on the included criteria. Review of the literature was performed until data saturation was reached; a form was used to extract the capabilities. In the second step, study population were hospital managers, police, emergency, statisticians, and IT experts in trauma, emergency and police centers. Sampling was purposive. Data was collected using a questionnaire based on the first step data; validity and reliability were determined by content validity and Cronbach’s alpha of 75%. Data was analyzed using the decision Delphi technique. Results GIS capabilities were identified in ten categories and 64 sub-categories. Import and process of spatial and descriptive data and so, analysis of this data were the most important capabilities of GIS in traffic accident information management. Conclusion Storing and retrieving of descriptive and spatial data, providing statistical analysis in table, chart and zoning format, management of bad structure issues, determining the cost effectiveness of the decisions and prioritizing their implementation were the most important capabilities of GIS which can be efficient in the management of traffic accident information. PMID:28848627

  5. Medical Big Data Warehouse: Architecture and System Design, a Case Study: Improving Healthcare Resources Distribution.

    PubMed

    Sebaa, Abderrazak; Chikh, Fatima; Nouicer, Amina; Tari, AbdelKamel

    2018-02-19

    The huge increases in medical devices and clinical applications which generate enormous data have raised a big issue in managing, processing, and mining this massive amount of data. Indeed, traditional data warehousing frameworks can not be effective when managing the volume, variety, and velocity of current medical applications. As a result, several data warehouses face many issues over medical data and many challenges need to be addressed. New solutions have emerged and Hadoop is one of the best examples, it can be used to process these streams of medical data. However, without an efficient system design and architecture, these performances will not be significant and valuable for medical managers. In this paper, we provide a short review of the literature about research issues of traditional data warehouses and we present some important Hadoop-based data warehouses. In addition, a Hadoop-based architecture and a conceptual data model for designing medical Big Data warehouse are given. In our case study, we provide implementation detail of big data warehouse based on the proposed architecture and data model in the Apache Hadoop platform to ensure an optimal allocation of health resources.

  6. Development of Novel PEM Membrane and Multiphase CD Modeling of PEM Fuel Cell

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    K. J. Berry; Susanta Das

    2009-12-30

    To understand heat and water management phenomena better within an operational proton exchange membrane fuel cell's (PEMFC) conditions, a three-dimensional, two-phase computational fluid dynamic (CFD) flow model has been developed and simulated for a complete PEMFC. Both liquid and gas phases are considered in the model by taking into account the gas flow, diffusion, charge transfer, change of phase, electro-osmosis, and electrochemical reactions to understand the overall dynamic behaviors of species within an operating PEMFC. The CFD model is solved numerically under different parametric conditions in terms of water management issues in order to improve cell performance. The results obtainedmore » from the CFD two-phase flow model simulations show improvement in cell performance as well as water management under PEMFCs operational conditions as compared to the results of a single phase flow model available in the literature. The quantitative information obtained from the two-phase model simulation results helped to develop a CFD control algorithm for low temperature PEM fuel cell stacks which opens up a route in designing improvement of PEMFC for better operational efficiency and performance. To understand heat and water management phenomena better within an operational proton exchange membrane fuel cell's (PEMFC) conditions, a three-dimensional, two-phase computational fluid dynamic (CFD) flow model has been developed and simulated for a complete PEMFC. Both liquid and gas phases are considered in the model by taking into account the gas flow, diffusion, charge transfer, change of phase, electro-osmosis, and electrochemical reactions to understand the overall dynamic behaviors of species within an operating PEMFC. The CFD model is solved numerically under different parametric conditions in terms of water management issues in order to improve cell performance. The results obtained from the CFD two-phase flow model simulations show improvement in cell performance as well as water management under PEMFCs operational conditions as compared to the results of a single phase flow model available in the literature. The quantitative information obtained from the two-phase model simulation results helped to develop a CFD control algorithm for low temperature PEM fuel cell stacks which opens up a route in designing improvement of PEMFC for better operational efficiency and performance.« less

  7. Palo Alto Research Center - Smart Embedded Network of Sensors with an Optical Readout

    ScienceCinema

    Raghavan, Ajay; Sahu, Saroj; Bringans, Ross; Johnson, Noble; Kiesel, Peter; Saha, Bhaskar

    2018-05-18

    PARC is developing new fiber optic sensors that would be embedded into batteries to monitor and measure key internal parameters during charge and discharge cycles. Two significant problems with today's best batteries are their lack of internal monitoring capabilities and their design oversizing. The lack of monitoring interferes with the ability to identify and manage performance or safety issues as they arise, which are presently managed by very conservative design oversizing and protection approaches that result in cost inefficiencies. PARC's design combines low-cost, embedded optical battery sensors and smart algorithms to overcome challenges faced by today's best battery management systems. These advanced fiber optic sensing technologies have the potential to dramatically improve the safety, performance, and life-time of energy storage systems.

  8. Human Factors Society, Annual Meeting, 35th, San Francisco, CA, Sept. 2-6, 1991, Proceedings. Vols. 1 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    These proceedings discuss human factor issues related to aerospace systems, aging, communications, computer systems, consumer products, education and forensic topics, environmental design, industrial ergonomics, international technology transfer, organizational design and management, personality and individual differences in human performance, safety, system development, test and evaluation, training, and visual performance. Particular attention is given to HUDs, attitude indicators, and sensor displays; human factors of space exploration; behavior and aging; the design and evaluation of phone-based interfaces; knowledge acquisition and expert systems; handwriting, speech, and other input techniques; interface design for text, numerics, and speech; and human factor issues in medicine. Also discussedmore » are cumulative trauma disorders, industrial safety, evaluative techniques for automation impacts on the human operators, visual issues in training, and interpreting and organizing human factor concepts and information.« less

  9. Design of systems for productivity and well being.

    PubMed

    Edwards, Kasper; Jensen, Per Langaa

    2014-01-01

    It has always been an ambition within the ergonomic profession to ensure that design or redesign of production systems consider both productivity and employee well being, but there are many approaches to how to achieve this. This paper identifies the basic issues to be addressed in light of some research activities at DTU, especially by persons responsible for facilitating design processes. Four main issues must be addressed: (1) determining the limits and scope of the system to be designed; (2) identifying stakeholders related to the system and their role in the system design; (3) handling the process' different types of knowledge; and (4) emphasizing that performance management systems, key performance indicators (KPIs), and leadership are also part of the system design and must be given attention. With the examples presented, we argue that knowledge does exist to help system design facilitators address these basic issues. Copyright © 2013. Published by Elsevier Ltd.

  10. Human Factors Considerations for Performance-Based Navigation

    NASA Technical Reports Server (NTRS)

    Barhydt, Richard; Adams, Catherine A.

    2006-01-01

    A transition toward a performance-based navigation system is currently underway in both the United States and around the world. Performance-based navigation incorporates Area Navigation (RNAV) and Required Navigation Performance (RNP) procedures that do not rely on the location of ground-based navigation aids. These procedures offer significant benefits to both operators and air traffic managers. Under sponsorship from the Federal Aviation Administration (FAA), the National Aeronautics and Space Administration (NASA) has undertaken a project to document human factors issues that have emerged during RNAV and RNP operations and propose areas for further consideration. Issues were found to include aspects of air traffic control and airline procedures, aircraft systems, and procedure design. Major findings suggest the need for human factors-specific instrument procedure design guidelines. Ongoing industry and government activities to address air-ground communication terminology, procedure design improvements, and chart-database commonality are strongly encouraged.

  11. Eighth Goddard Conference on Mass Storage Systems and Technologies in Cooperation with the Seventeenth IEEE Symposium on Mass Storage Systems

    NASA Technical Reports Server (NTRS)

    Kobler, Benjamin (Editor); Hariharan, P. C. (Editor)

    2000-01-01

    This document contains copies of those technical papers received in time for publication prior to the Eighth Goddard Conference on Mass Storage Systems and Technologies which is being held in cooperation with the Seventeenth IEEE Symposium on Mass Storage Systems at the University of Maryland University College Inn and Conference Center March 27-30, 2000. As one of an ongoing series, this Conference continues to provide a forum for discussion of issues relevant to the management of large volumes of data. The Conference encourages all interested organizations to discuss long term mass storage requirements and experiences in fielding solutions. Emphasis is on current and future practical solutions addressing issues in data management, storage systems and media, data acquisition, long term retention of data, and data distribution. This year's discussion topics include architecture, future of current technology, new technology with a special emphasis on holographic storage, performance, standards, site reports, vendor solutions. Tutorials will be available on stability of optical media, disk subsystem performance evaluation, I/O and storage tuning, functionality and performance evaluation of file systems for storage area networks.

  12. Independent Orbiter Assessment (IOA): FMEA/CIL assessment

    NASA Technical Reports Server (NTRS)

    Hinsdale, L. W.; Swain, L. J.; Barnes, J. E.

    1988-01-01

    The McDonnell Douglas Astronautics Company (MDAC) was selected to perform an Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL). Direction was given by the Orbiter and GFE Projects Office to perform the hardware analysis and assessment using the instructions and ground rules defined in NSTS 22206. The IOA analysis featured a top-down approach to determine hardware failure modes, criticality, and potential critical items. To preserve independence, the analysis was accomplished without reliance upon the results contained within the NASA and Prime Contractor FMEA/CIL documentation. The assessment process compared the independently derived failure modes and criticality assignments to the proposed NASA post 51-L FMEA/CIL documentation. When possible, assessment issues were discussed and resolved with the NASA subsystem managers. Unresolved issues were elevated to the Orbiter and GFE Projects Office manager, Configuration Control Board (CCB), or Program Requirements Control Board (PRCB) for further resolution. The most important Orbiter assessment finding was the previously unknown stuck autopilot push-button criticality 1/1 failure mode. The worst case effect could cause loss of crew/vehicle when the microwave landing system is not active. It is concluded that NASA and Prime Contractor Post 51-L FMEA/CIL documentation assessed by IOA is believed to be technically accurate and complete. All CIL issues were resolved. No FMEA issues remain that have safety implications. Consideration should be given, however, to upgrading NSTS 22206 with definitive ground rules which more clearly spell out the limits of redundancy.

  13. Life Sciences Centrifuge Facility assessment

    NASA Technical Reports Server (NTRS)

    Benson, Robert H.

    1994-01-01

    This report provides an assessment of the status of the Centrifuge Facility being developed by ARC for flight on the International Space Station Alpha. The assessment includes technical status, schedules, budgets, project management, performance of facility relative to science requirements, and identifies risks and issues that need to be considered in future development activities.

  14. FY 2004 Performance and Accountability Report

    ERIC Educational Resources Information Center

    US Department of Education, 2004

    2004-01-01

    The Department?s financial statements, which appear on pp. 115?119, received an unqualified audit opinion issued by the independent accounting firm of Ernst & Young LLP for the third consecutive year. Preparing these statements is part of the Department?s continuing efforts to achieve financial management excellence and to provide accurate and…

  15. Ten steps to successful software process improvement

    NASA Technical Reports Server (NTRS)

    Kandt, R. K.

    2003-01-01

    This paper identifies ten steps for managing change that address organizational and cultural issues. Four of these steps are critical, that if not done, will almost guarantee failure. This ten-step program emphasizes the alignment of business goals, change process goals, and the work performed by the employees of an organization.

  16. Teachers' Voices/Stories: Dilemmas in Representing the Research Data

    ERIC Educational Resources Information Center

    Naidu, Sham

    2011-01-01

    The article discusses the issue of how to represent teachers' stories and narratives in the arena of performance management. It is argued that at a time when "teachers" voices are being enthusiastically pursued and promoted, teachers' work is being technisized and narrowed" (Goodson, 1998). Arguably, teachers' knowledge regarding their work…

  17. Nutritional management of feedlot cattle to optimize performance and minimize environmental impact

    USDA-ARS?s Scientific Manuscript database

    The cattle feeding industry is a new but rapidly growing industry in Brazil and other parts of South America. This presentation/ manuscript provides a brief overview of potential environmental issues faced by concentrated cattle feeding operations, and methods to minimize adverse effects on the envi...

  18. Digital Libraries Are Much More than Digitized Collections.

    ERIC Educational Resources Information Center

    Peters, Peter Evan

    1995-01-01

    The digital library encompasses the application of high-performance computers and networks to the production, distribution, management, and use of knowledge in research and education. A joint project by three federal agencies, which is investing in digital library initiatives at six universities, is discussed. A sidebar provides issues to consider…

  19. Smart truck driver assistant : a cost effective solution for real time management of container delivery to trucks.

    DOT National Transportation Integrated Search

    2015-12-01

    The twin ports of Los Angeles and Long Beach are two of the busiest ports in the country. The marine terminals at these ports are under tremendous pressure to enhance their performance levels. One major issue in the terminals' productivity and perfor...

  20. The Promise and the Performance: What's Really Basic in Teaching TAs.

    ERIC Educational Resources Information Center

    Bloom, Lynn Z.

    In order to promote professionalism and transform novice teaching assistants into capable instructors, the University of New Mexico has established a required course in "Teaching Composition." The course attempts to define institutional and departmental goals, and explore such issues in class management as organization, discipline,…

  1. Leadership of Academics in Research

    ERIC Educational Resources Information Center

    Ball, Stephen

    2007-01-01

    Leadership is a key issue for universities and is increasingly regarded as beneficial to improved performance across all activities, including research. This article reports on part of a completed doctoral study that had the aim of developing a deeper understanding of the role of leadership as it relates to hospitality management research by…

  2. Promotion Criteria and Satisfaction of School Teachers in Hong Kong

    ERIC Educational Resources Information Center

    Wong, Ping-Man; Wong, Chi-Sum

    2005-01-01

    Teacher promotion is an important issue in school administration that deserves more academic attention. In business management a commonly used tool for employee motivation, aside from promotion, is the compensation system, which can be flexibly and frequently adjusted with the performance of individual staff members. However, in the existing…

  3. Organizational Failure in an NHS Hospital Trust: A Qualitative Study.

    PubMed

    Ravaghi, Hamid; Mannion, Russell; Sajadi, Haniye Sadat

    2015-01-01

    The objective was to explore the key factors associated with organizational failure in an NHS Hospital Trust. This case study adopted a qualitative design. Fifty-seven semistructured interviews and document analyses were conducted as well. Data were analyzed using a framework analysis method. A range of symptoms of organizational performance failure was identified. These relate to a financial deficit, lack of good external relationships, inability to meet core targets, a lack of clear management systems, and low staff morale. These markers had not been taken seriously by the previous senior management team. Symptoms of failure were the reflection of presence of secondary and primary causes of failure. Poor managerial leadership, poor financial control and performance management, lack of open culture, distraction by 2 large projects, and the lack of clinician engagement were perceived as internal causes of failure and the high level of policy changes within the NHS as the key external cause. The level of deprivation in the area was also thought to have had a negative impact on performance. The findings reinforce and expand on those of recent studies across the public sector. Tracking an organization's performance and early diagnosis of performance problems, focusing on performance management systems, and taking into account contextual factors are issues that should be considered.

  4. Evaluating the underlying factors behind variable rate debt.

    PubMed

    McCue, Michael J; Kim, Tae Hyun Tanny

    2007-01-01

    Recent trends show a greater usage of variable rate debt among health care bond issues. In 2004, 63.4% of the total health care bonds issued were variable rate compared with 30.6% in 1995 (Fitch Ratings, 2005). The purpose of this study is to gain a better understanding of the underlying factors, credit spread, issue characteristics, and issuer factors behind why hospitals and health system borrowers select variable rate debt compared with fixed rate debt. From 2000 to 2004, this study sampled 230 newly issued tax-exempt bonds issued by acute care hospitals and health care systems that included both variable and fixed rate debt issues. Using a logistic regression model, hospitals with variable rate debt issues were assigned a value of 1, whereas hospitals with fixed rate debt issues were assigned a value of 0. This study found a positive association between bond insurance and variable rate debt and a negative association between callable feature and variable rate debt. Facilities located in certificate-of-need states that possessed higher case mix acuity, earned higher profit margins, generated higher debt service coverage, and held less debt were more likely to issue variable rate debt. Overall, hospital managers and board members of hospitals possessing a strong financial performance have an interest in utilizing variable rate debt to lower their cost of capital. In addition, this outcome may also reflect that investment bankers are doing a better job in educating senior hospital management about the interest rate savings benefit of variable rate compared with fixed rate debt.

  5. Development of a Prototype Automation Simulation Scenario Generator for Air Traffic Management Software Simulations

    NASA Technical Reports Server (NTRS)

    Khambatta, Cyrus F.

    2007-01-01

    A technique for automated development of scenarios for use in the Multi-Center Traffic Management Advisor (McTMA) software simulations is described. The resulting software is designed and implemented to automate the generation of simulation scenarios with the intent of reducing the time it currently takes using an observational approach. The software program is effective in achieving this goal. The scenarios created for use in the McTMA simulations are based on data taken from data files from the McTMA system, and were manually edited before incorporation into the simulations to ensure accuracy. Despite the software s overall favorable performance, several key software issues are identified. Proposed solutions to these issues are discussed. Future enhancements to the scenario generator software may address the limitations identified in this paper.

  6. Scaled CMOS Reliability and Considerations for Spacecraft Systems: Bottom-Up and Top-Down Perspective

    NASA Technical Reports Server (NTRS)

    White, Mark

    2012-01-01

    New space missions will increasingly rely on more advanced technologies because of system requirements for higher performance, particularly in instruments and high-speed processing. Component-level reliability challenges with scaled CMOS in spacecraft systems from a bottom-up perspective have been presented. Fundamental Front-end and Back-end processing reliability issues with more aggressively scaled parts have been discussed. Effective thermal management from system-level to the componentlevel (top-down) is a key element in overall design of reliable systems. Thermal management in space systems must consider a wide range of issues, including thermal loading of many different components, and frequent temperature cycling of some systems. Both perspectives (top-down and bottom-up) play a large role in robust, reliable spacecraft system design.

  7. Adapting the EDuMaP method to test the performance of the Norwegian early warning system for weather-induced landslides

    NASA Astrophysics Data System (ADS)

    Piciullo, Luca; Dahl, Mads-Peter; Devoli, Graziella; Colleuille, Hervé; Calvello, Michele

    2017-06-01

    The Norwegian national landslide early warning system (LEWS), operational since 2013, is managed by the Norwegian Water Resources and Energy Directorate and was designed for monitoring and forecasting the hydrometeorological conditions potentially triggering slope failures. Decision-making in the LEWS is based upon rainfall thresholds, hydrometeorological and real-time landslide observations as well as on landslide inventory and susceptibility maps. Daily alerts are issued throughout the country considering variable size warning zones. Warnings are issued once per day for the following 3 days and can be updated according to weather forecasts and information gathered by the monitoring network. The performance of the LEWS operational in Norway has been evaluated applying the EDuMaP method, which is based on the computation of a duration matrix relating number of landslides and warning levels issued in a warning zone. In the past, this method has been exclusively employed to analyse the performance of regional early warning models considering fixed warning zones. Herein, an original approach is proposed for the computation of the elements of the duration matrix in the case of early warning models issuing alerts on variable size areas. The approach has been used to evaluate the warnings issued in Western Norway, in the period 2013-2014, considering two datasets of landslides. The results indicate that the landslide datasets do not significantly influence the performance evaluation, although a slightly better performance is registered for the smallest dataset. Different performance results are observed as a function of the values adopted for one of the most important input parameters of EDuMaP, the landslide density criterion (i.e. setting the thresholds to differentiate among classes of landslide events). To investigate this issue, a parametric analysis has been conducted; the results of the analysis show significant differences among computed performances when absolute or relative landslide density criteria are considered.

  8. AANA Journal course: update for nurse anesthetists--ERR WATCH: anesthesia crisis resource management from the nurse anesthetist's perspective.

    PubMed

    Fletcher, J L

    1998-12-01

    Anesthesia crisis resource management (ACRM) was developed by David Gaba, MD, and colleagues at Stanford University in the early 1990s. Derived from cockpit resource management of the aviation industry, ACRM addresses the issues of human performance and patient safety in anesthesia. Due to the inherent complexity of our dynamic work environment, we are frequently faced with situations that could escalate into critical incidents. ACRM explains the role of personal and environmental factors that can contribute to the evolution of critical incidents and provides the practitioner with some behavioral and intellectual guidelines to manage the risks more effectively. ERR WATCH is an acronym I developed to interpret the principles of ACRM from the nurse anesthetist's perspective. It provides a quick review of the major principles of ACRM, which are Environment, Resources, Reevaluation, Workload, Attention, Teamwork, Communication, and Help. Used together with good clinical management, these principles may provide an edge in solving complex problems and improving performance.

  9. Quicker, slicker, and better? An evaluation of a web-based human resource management system

    NASA Astrophysics Data System (ADS)

    Gibb, Stephen; McBride, Andrew

    2001-10-01

    This paper reviews the design and development of a web based Human Resource Management (HRM) system which has as its foundation a 'capability profiler' tool for analysing individual or team roles in organisations. This provides a foundation for managing a set of integrated activities in recruitment and selection, performance and career management, and training and development for individuals, teams, and whole organisations. The challenges of representing and processing information about the human side of organisation encountered in the design and implementation of such systems are evident. There is a combination of legal, practical, technical and philosophical issues to be faced in the processes of defining roles, selecting staff, monitoring and managing the performance of employees in the design and implementation of such systems. The strengths and weaknesses of web based systems in this context are evaluated. This evaluation highlights both the potential, given the evolution of broader Enterprise Resource Planning (ERP) systems and strategies in manufacturing, and concerns about the migration of HRM processes to such systems.

  10. Strategic issues in performance appraisal: theory and practice.

    PubMed

    Fombrun, C J; Laud, R L

    1983-01-01

    Performance appraisal systems have tremendous strategic potential for governing employee behavior and thus corporate direction through their links to selection, training and career planning, and reward systems. Authors Charles J. Fombrun, assistant professor of management at the University of Pennsylvania's Wharton School, and Robert P. Laud, senior vice-president of Drake Beam Morin, Inc., surveyed appraisal systems of Fortune 1300 corporations to find out how well companies are realizing this potential. Among their conclusions: (1) In most organizations, the typical performance appraisal system is focused on short-term goals. Strengthening the linkage between the appraisal system and the long-term implications of strategic planning could improve organizational effectiveness in the future. (2) The performance appraisal system's most prevalent use is as a feedback mechanism rather than as a management tool. Thus, the authors conclude, the role of the performance appraisal system as a strategic organizational tool is largely unappreciated by U.S. organizations.

  11. Insights and participatory actions driven by a socio-hydrogeological approach for groundwater management: the Grombalia Basin case study (Tunisia)

    NASA Astrophysics Data System (ADS)

    Tringali, C.; Re, V.; Siciliano, G.; Chkir, N.; Tuci, C.; Zouari, K.

    2017-08-01

    Sustainable groundwater management strategies in water-scarce countries need to guide future decision-making processes pragmatically, by simultaneously considering local needs, environmental problems and economic development. The socio-hydrogeological approach named `Bir Al-Nas' has been tested in the Grombalia region (Cap Bon Peninsula, Tunisia), to evaluate the effectiveness of complementing hydrogeochemical and hydrogeological investigations with the social dimension of the issue at stake (which, in this case, is the identification of groundwater pollution sources). Within this approach, the social appraisal, performed through social network analysis and public engagement of water end-users, allowed hydrogeologists to get acquainted with the institutional dimension of local groundwater management, identifying issues, potential gaps (such as weak knowledge transfer among concerned stakeholders), and the key actors likely to support the implementation of the new science-based management practices resulting from the ongoing hydrogeological investigation. Results, hence, go beyond the specific relevance for the Grombaila basin, showing the effectiveness of the proposed approach and the importance of including social assessment in any given hydrogeological research aimed at supporting local development through groundwater protection measures.

  12. ERCMExpress. Volume 3, Issue 4

    ERIC Educational Resources Information Center

    Taymans, Mary Frances; McDonald, Dale

    2007-01-01

    The Emergency Response and Crisis Management (ERCM) Technical Assistance Center's "ERCMExpress" is a newsletter that provides comprehensive information on key issues in school emergency management. This issue, entitled "Emergency Management Opportunities and Challenges for Non-Public Schools," examines integrating non-public…

  13. The new challenges of end-of-life tyres management systems: A Spanish case study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Uruburu, Ángel, E-mail: angel.uruburu@upm.es; Ponce-Cueto, Eva, E-mail: eva.ponce@upm.es; Center for Transportation and Logistics, Massachusetts Institute of Technology, Cambridge, MA

    Highlights: ► Impact of the implementation of the Directive 2008/98/EC in Spain for end-of-life tyres. ► Characterization of the reverse supply chain for collecting, recovering, and treating end-of-life tyres. ► Identification of challenges to be coped and issues to be covered. ► Potential new applications for end-of-life tyres and development of new management related strategies. - Abstract: Directive 2008/98/EC released by the European Union represents a significant step forward in all relevant aspects of waste management. Under the already established, extended produced responsibility (EPR) principle, new policies have been enunciated to continuously achieve better overall environmental performance of key productsmore » throughout their life phases. This paper discusses how the directive is being articulated in Spain by the main integrated management system (IMS) for end-of-life (EOL) tyres since its creation in 2006. Focusing on the IMS technological, economic and legal aspects, the study provides a global perspective and evaluation of how the IMS is facing the current issues to resolve, the new challenges that have appeared and the management vision for the coming years.« less

  14. Understanding safety and production risks in rail engineering planning and protection.

    PubMed

    Wilson, John R; Ryan, Brendan; Schock, Alex; Ferreira, Pedro; Smith, Stuart; Pitsopoulos, Julia

    2009-07-01

    Much of the published human factors work on risk is to do with safety and within this is concerned with prediction and analysis of human error and with human reliability assessment. Less has been published on human factors contributions to understanding and managing project, business, engineering and other forms of risk and still less jointly assessing risk to do with broad issues of 'safety' and broad issues of 'production' or 'performance'. This paper contains a general commentary on human factors and assessment of risk of various kinds, in the context of the aims of ergonomics and concerns about being too risk averse. The paper then describes a specific project, in rail engineering, where the notion of a human factors case has been employed to analyse engineering functions and related human factors issues. A human factors issues register for potential system disturbances has been developed, prior to a human factors risk assessment, which jointly covers safety and production (engineering delivery) concerns. The paper concludes with a commentary on the potential relevance of a resilience engineering perspective to understanding rail engineering systems risk. Design, planning and management of complex systems will increasingly have to address the issue of making trade-offs between safety and production, and ergonomics should be central to this. The paper addresses the relevant issues and does so in an under-published domain - rail systems engineering work.

  15. Crisis management can leave residual effects.

    PubMed

    Margolis, G L; DeMuro, P R

    1991-10-01

    A healthcare organization that once suffered from poor financial performance may fail to correct recovery methods that can cause lingering legal and accounting problems. A crisis management style is prone to creating problems with an organization's debt structure, Medicare and Medicaid payment, tax issues, labor relations, licensing and accreditation, compliance with fraud and abuse rules, and accounting for charity care. After stabilizing a worrisome financial situation, a healthcare organization should conduct an internal audit to ensure that its legal and accounting practices remain above board.

  16. The Air Force’s Experience with Should-Cost Reviews and Options for Enhancing Its Capability to Conduct Them

    DTIC Science & Technology

    2012-01-01

    Patterson Air Force Base, Ohio: Air Force Institute of Technology, 1972. Williams , Robert Leon, A Review of the “Should Cost” Process and Management Issues...We thank William Bartlebaugh of the Air Force Cost Analysis Agency; David Dudley of the Air Force Electronics System Center; Tommy Gilbert of Warner...better performance. The program experienced large cost overruns. Air Force Deputy for Management Systems A. Ernest Fitzgerald, on the staff of the

  17. Designing a balanced scorecard for a tertiary care hospital in Pakistan: a modified Delphi group exercise.

    PubMed

    Rabbani, Fauziah; Jafri, Syed M Wasim; Abbas, Farhat; Shah, Mairaj; Azam, Syed Iqbal; Shaikh, Babar Tasneem; Brommels, Mats; Tomson, Goran

    2010-01-01

    Balanced Scorecards (BSC) are being implemented in high income health settings linking organizational strategies with performance data. At this private university hospital in Pakistan an elaborate information system exists. This study aimed to make best use of available data for better performance management. Applying the modified Delphi technique an expert panel of clinicians and hospital managers reduced a long list of indicators to a manageable size. Indicators from existing documents were evaluated for their importance, scientific soundness, appropriateness to hospital's strategic plan, feasibility and modifiability. Panel members individually rated each indicator on a scale of 1-9 for the above criteria. Median scores were assigned. Of an initial set of 50 indicators, 20 were finally selected to be assigned to the four BSC quadrants. These were financial (n = 4), customer or patient (n = 4), internal business or quality of care (n = 7) and innovation/learning or employee perspectives (n = 5). A need for stringent definitions, international benchmarking and standardized measurement methods was identified. BSC compels individual clinicians and managers to jointly work towards improving performance. This scorecard is now ready to be implemented by this hospital as a performance management tool for monitoring indicators, addressing measurement issues and enabling comparisons with hospitals in other settings. Copyright 2010 John Wiley & Sons, Ltd.

  18. Medical and health issues in coal arbitration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Volz, M.M.

    The role of arbitration in settling coal mining health and safety issues is limited in each case to the facts and contractual provisions which apply to a specific grievance. The author reviews various situations under the physical or mental inability to perform the work, personnel or sick leave, allergies, and alcoholism. The weight given to medical opinions needs to be tempered by good faith on the part of management. Personnel have the right to seek opinions from physicians of their choice to supplement the opinions of company medical staff.

  19. 'Virtual' central business office: how UMMS improved revenue cycle performance.

    PubMed

    Henciak, Bill; Fontaine, Christine; Fields, Keith; Parks, Stacy

    2010-06-01

    Based on its experience with implementing a virtual central business office, UMMS recommends the following steps to ensure the success of such an initiative: Define the process flow for the organization's day-today revenue cycle operations prior to implementation. Then select best practices and milestones for managing accounts. Identify any possible technology issues that could arise during implementation prior to go live. Hold a midproject debriefing with staff. Develop an organizational chart that details who is responsible for handling issues that arise during implementation and afterward.

  20. Adventures in Space Medicine

    NASA Technical Reports Server (NTRS)

    Billica, Roger D.

    1999-01-01

    Human space flight experience has demonstrated a variety of hazards and risks to health and performance. In developing ways to help respond to these issues, the field of space medicine has developed a comprehensive program of space flight health risk management that has resulted in positive contributions to medicine and society in general. Examples include accelerated focus on critical health issues such as aging and osteoporosis, and development of new technologies such as non-invasive diagnostic testing for diabetics. The role of health care professionals in human space exploration represents a fulfillment of new adventures and expanding frontiers.

  1. Nurturing a growing field: Computers & Geosciences

    NASA Astrophysics Data System (ADS)

    Mariethoz, Gregoire; Pebesma, Edzer

    2017-10-01

    Computational issues are becoming increasingly critical for virtually all fields of geoscience. This includes the development of improved algorithms and models, strategies for implementing high-performance computing, or the management and visualization of the large datasets provided by an ever-growing number of environmental sensors. Such issues are central to scientific fields as diverse as geological modeling, Earth observation, geophysics or climatology, to name just a few. Related computational advances, across a range of geoscience disciplines, are the core focus of Computers & Geosciences, which is thus a truly multidisciplinary journal.

  2. Strategic environmental management planning, team-building and implementation: Principles and experience at Watkins-Johnson Company

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Molony, C.

    This paper provides a short discussion of the realities of implementing a strategic environmental management program in a modern corporation. The first half lists typical business challenges which are related to EPA regulations, to property risk management, and to company performance which can have a positive impact on the environment. The strategic environmental manager anticipates these business issues successfully. The list provided is based on my experiences as an environment and safety professional over the past sixteen years, while working at three Silicon Valley electronics firms. The second half discusses examples of relevant, specific accomplishments in the environment-related business activitiesmore » of Watkins-Johnson Company.« less

  3. Managing Senegalese water resources: Definition and relative importance of information needs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Engi, D.

    1998-09-01

    This report provides an overview of the results of the Vital Issues process as implemented for the Senegal Water Resources Management Initiative, a collaborative effort between the Senegalese Ministry of Water Resources and Sandia National Laboratories. This Initiative is being developed to assist in the development of an efficient and sustainable water resources management system for Senegal. The Vital Issues process was used to provide information for the development of a proposal that will recommend actions to address the key management issues and establish a state-of-the-art decision support system (DSS) for managing Senegal`s water resources. Three Vital Issues panel meetingsmore » were convened to (1) develop a goal statement and criteria for identifying and ranking the issues vital to water resources management in Senegal; (2) define and rank the issues, and (3) identify and prioritize a preliminary list of information needed to address the vital issues. The selection of panelists from the four basic institutional perspectives (government, industry, academe, and citizens` interest groups) ensured a high level of stakeholder representation on the panels.« less

  4. Comparing health system performance assessment and management approaches in the Netherlands and Ontario, Canada

    PubMed Central

    Tawfik-Shukor, Ali R; Klazinga, Niek S; Arah, Onyebuchi A

    2007-01-01

    Background Given the proliferation and the growing complexity of performance measurement initiatives in many health systems, the Netherlands and Ontario, Canada expressed interests in cross-national comparisons in an effort to promote knowledge transfer and best practise. To support this cross-national learning, a study was undertaken to compare health system performance approaches in The Netherlands with Ontario, Canada. Methods We explored the performance assessment framework and system of each constituency, the embeddedness of performance data in management and policy processes, and the interrelationships between the frameworks. Methods used included analysing governmental strategic planning and policy documents, literature and internet searches, comparative descriptive tables, and schematics. Data collection and analysis took place in Ontario and The Netherlands. A workshop to validate and discuss the findings was conducted in Toronto, adding important insights to the study. Results Both Ontario and The Netherlands conceive health system performance within supportive frameworks. However they differ in their assessment approaches. Ontario's Scorecard links performance measurement with strategy, aimed at health system integration. The Dutch Health Care Performance Report (Zorgbalans) does not explicitly link performance with strategy, and focuses on the technical quality of healthcare by measuring dimensions of quality, access, and cost against healthcare needs. A backbone 'five diamond' framework maps both frameworks and articulates the interrelations and overlap between their goals, themes, dimensions and indicators. The workshop yielded more contextual insights and further validated the comparative values of each constituency's performance assessment system. Conclusion To compare the health system performance approaches between The Netherlands and Ontario, Canada, several important conceptual and contextual issues must be addressed, before even attempting any future content comparisons and benchmarking. Such issues would lend relevant interpretational credibility to international comparative assessments of the two health systems. PMID:17319947

  5. Natural resource manager perceptions of agency performance on climate change.

    PubMed

    Lemieux, Christopher J; Thompson, Jessica L; Dawson, Jackie; Schuster, Rudy M

    2013-01-15

    An important precursor to the adoption of climate change adaptation strategies is to understand the perceived capacity to implement and operationalize such strategies. Utilizing an importance-performance analysis (IPA) evaluation framework, this article presents a comparative case study of federal and state land and natural resource manager perceptions of agency performance on factors influencing adaptive capacity in two U.S. regions (northern Colorado and southwestern South Dakota). Results revealed several important findings with substantial management implications. First, none of the managers ranked the adaptive capacity factors as a low priority. Second, managers held the perception that their agencies were performing either neutrally or poorly on most factors influencing adaptive capacity. Third, gap analysis revealed that significant improvements are required to facilitate optimal agency functioning when dealing with climate change-related management issues. Overall, results suggest that a host of institutional and policy-oriented (e.g., lack of clear mandate to adapt to climate change), financial and human resource (e.g., inadequate staff and financial resources), informational (e.g., inadequate research and monitoring programs) and contextual barriers (e.g., sufficient regional networks to mitigate potential transboundary impacts) currently challenge the efficient and effective integration of climate change into decision-making and management within agencies working in these regions. The IPA framework proved to be an effective tool to help managers identify and understand agency strengths, areas of concern, redundancies, and areas that warrant the use of limited funds and/or resource re-allocation in order to enhance adaptive capacity and maximize management effectiveness with respect to climate change. Copyright © 2012 Elsevier Ltd. All rights reserved.

  6. [Identifying indicators of good practice in clinical and healthcare management].

    PubMed

    Bermúdez Tamayo, C; Olry de Labry Lima, A; García Mochón, L

    To identify good practices in order to develop and implement indicators of health outcomes for clinical and healthcare management, as well as the characteristics for an indicator to be considered adequate. A scoping review was performed, with the following phases: 1) Search and identification of bibliography. 2) Selection of relevant documents. Including those studies that discussed issues related to good practices for the use of health indicators in the management field. Those published in a language other than English or Spanish or before 2006 were excluded. 3) Analysis and extraction of information. 4) Consultation with stakeholders, using a qualitative methodology through Concept Mapping, with the participation of 40 experts (decision-makers, scientific societies, and health professionals). The data collection process included an inductive and structured procedure, with prioritisation of ideas grouped into clusters, according to feasibility and importance criteria (0-10 scale). Good practices identified 2 levels: 1) macro-management: Define a framework for the evaluation of indicators and establish a benchmark of indicators. 2) meso-management: Establish indicators according to evidence and expert consensus, taking into account priority areas and topics, testing before final use, and communicate results adequately. The characteristics of a suitable indicator are: 1) Approach of an important issue, 2) Scientific validity, 3) Possibility of measurement with reliable data, 4) Meaning of useful and applicable measurement, and 5) Wide scope. The best practices for the use of indicators in clinical and healthcare management can make it easier to monitor performance and accountability, as well as to support the decision-making addressed at the development of initiatives for quality improvement. Copyright © 2018 SECA. Publicado por Elsevier España, S.L.U. All rights reserved.

  7. Economic perspective on strategic human capital management and planning for the Centers for Disease Control and Prevention.

    PubMed

    Roy, Kakoli; Chen, Zhuo Adam; Crawford, Carol A Gotway

    2009-11-01

    An organization's workforce--or human capital--is its most valuable asset. The 2002 President's Management Agenda emphasizes the importance of strategic human capital management by requiring all federal agencies to improve performance by enhancing personnel and compensation systems. In response to these directives, the Centers for Disease Control and Prevention (CDC) drafted its strategic human capital management plan to ensure that it is aligned strategically to support the agency's mission and its health protection goals. In this article, we explore the personnel economics literature to draw lessons from research studies that can help CDC enhance its human capital management and planning. To do so, we focus on topics that are of practical importance and empirical relevance to CDC's internal workforce and personnel needs with an emphasis on identifying promising research issues or methodological approaches. The personnel economics literature is rich with theoretically sound and empirically rigorous approaches for shaping an evidence-based approach to human capital management that can enhance incentives to attract, retain, and motivate a talented federal public health workforce, thereby promoting the culture of high-performance government.

  8. Mediating effect of sustainable product development on relationship between quality management practices and organizational performance: Empirical study of Malaysian automotive industry

    NASA Astrophysics Data System (ADS)

    Ahmad, Mohd Akhir; Asaad, Mohd Norhasni; Saad, Rohaizah; Iteng, Rosman; Rahim, Mohd Kamarul Irwan Abdul

    2016-08-01

    Global competition in the automotive industry has encouraged companies to implement quality management practices in all managerial aspects to ensure customer satisfaction in products and reduce costs. Therefore, guaranteeing only product quality is insufficient without considering product sustainability, which involves economic, environment, and social elements. Companies that meet both objectives gain advantages in the modern business environment. This study addresses the issues regarding product quality and sustainability in small and medium-sized enterprises in the Malaysian automotive industry. A research was carried out in 91 SMEs automotive suppliers in throughout Malaysia. The analyzed using SPSS ver.23 has been proposed in correlation study. Specifically, this study investigates the relationship between quality management practices and organizational performance as well as the mediating effect of sustainable product development on this relationship.

  9. Early elective colostomy following spinal cord injury.

    PubMed

    Boucher, Michelle

    Elective colostomy is an accepted method of bowel management for patients who have had a spinal cord injury (SCI). Approximately 2.4% of patients with SCI have a colostomy, and traditionally it is performed as a last resort several years after injury, and only if bowel complications persist when all other methods have failed. This is despite evidence that patients find a colostomy easier to manage and frequently report wishing it had been performed earlier. It was noticed in the author's spinal unit that increasing numbers of patients were requesting colostomy formation during inpatient rehabilitation following SCI. No supporting literature was found for this; it appears to be an emerging and untested practice. This article explores colostomy formation as a method of bowel management in patients with SCI, considers the optimal time for colostomy formation after injury and examines issues for health professionals.

  10. Quality control management and communication between radiologists and technologists.

    PubMed

    Nagy, Paul G; Pierce, Benjamin; Otto, Misty; Safdar, Nabile M

    2008-06-01

    The greatest barrier to quality control (QC) in the digital imaging environment is the lack of communication and documentation between those who interpret images and those who acquire them. Paper-based QC methods are insufficient in a digital image management system. Problem work flow must be incorporated into reengineering efforts when migrating to a digital practice. The authors implemented a Web-based QC feedback tool to document and facilitate the communication of issues identified by radiologists. The goal was to promote a responsive and constructive tool that contributes to a culture of quality. The hypothesis was that by making it easier for radiologists to submit quality issues, the number of QC issues submitted would increase. The authors integrated their Web-based quality tracking system with a clinical picture archiving and communication system so that radiologists could report quality issues without disrupting clinical work flow. Graphical dashboarding techniques aid supervisors in using this database to identify the root causes of different types of issues. Over the initial 12-month rollout period, starting in the general section, the authors recorded 20 times more QC issues submitted by radiologists, accompanied by a rise in technologists' responsiveness to QC issues. For technologists with high numbers of QC issues, the incorporation of data from this tracking system proved useful in performance appraisals and in driving individual improvement. This tool is an example of the types of information technology innovations that can be leveraged to support QC in the digital imaging environment. Initial data suggest that the result is not only an improvement in quality but higher levels of satisfaction for both radiologists and technologists.

  11. Management accounting use and financial performance in public health-care organisations: evidence from the Italian National Health Service.

    PubMed

    Macinati, Manuela S; Anessi-Pessina, E

    2014-07-01

    Reforms of the public health-care sector have emphasised the role of management accounting (MA). However, there is little systematic evidence on its use and benefits. To fill this gap, we propose a contingency-based model which addresses three related issues, that is, whether: (i) MA use is influenced by contextual variables and MA design; (ii) top-management satisfaction with MA mediates the relationship between MA design and MA use; and (iii) financial performance is influenced by MA use. A questionnaire was mailed out to all Italian public health-care organisations. Structural equation modelling was performed to validate the research hypotheses. The response rate was 49%. Our findings suggest that: (i) cost-containment strategies encourage more sophisticated MA designs; (ii) MA use is directly and indirectly influenced by contingency, organisational, and behavioural variables; (iii) a weakly significant positive relationship exists between MA use and financial performance. These findings are relevant from the viewpoint of both top managers and policymakers. The former must make sure that MA is not only technically advanced, but also properly understood and appreciated by users. The latter need to be aware that MA may improve performance in ways and along dimensions that may not fully translate into better financial results. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.

  12. Is It Possible? Investigating the Influence of External Quality Audit on University Performance

    ERIC Educational Resources Information Center

    Carr, Sarah; Hamilton, Emma; Meade, Phil

    2005-01-01

    This paper explores whether it is possible to isolate independent effects of external quality audit (EQA) and concludes that effectiveness evaluations have a stronger foundation when the combined effects of university governance and management initiatives and government initiatives are examined together with EQA. The issue of how successful these…

  13. Results of the 1992 State-Wide Business and Industry Survey.

    ERIC Educational Resources Information Center

    Jarrett, Carole, Comp.; And Others

    As part of an effort to develop courses and programs that reflect California business and industry's current and future needs, two studies were performed by Solano Community College to examine statewide trends and issues related to office automation and marketing and management. In conducting the study of office automation, 5,000 surveys were…

  14. Adapting Total Quality Doesn't Mean "Turning Learning into a Business."

    ERIC Educational Resources Information Center

    Schmoker, Mike; Wilson, Richard B.

    1993-01-01

    Although Alfie Kohn is a first-rate thinker, his article in the same "Educational Leadership" issue confuses adopting Total Quality Management methods with intelligently adapting them. Kohn wrestles too hard with the "worker/student" metaphor and wrongly disparages Deming's emphasis on data and performance. Schools can definitely benefit from…

  15. The Issue of Teacher Accountability: A South Australian Perspective

    ERIC Educational Resources Information Center

    Naidu, Sham

    2011-01-01

    In this article, the author critiques the notion of accountability in teachers' work. It serves to place in context the rationale and introduction of accountability mechanisms, such as the performance management policy, as implemented in South Australian public education. Further, it serves to illustrate what MacPherson (1998, p. 4) describes as…

  16. Operational Test and Evaluation Handbook for Aircrew Training Devices. Volume I. Planning and Management.

    DTIC Science & Technology

    1982-02-01

    of i, nd to (! Lvel op an awareness of the T&E roles and responsioi Ii ties Viir~dte various Air Force organizations involved in the T&EC process... mathematical models to determine controller messages and issue controller messages using computer generated speech. AUTOMATED PERFORMANCE ALERTS: Signals

  17. Connecting Diversity Efforts in the Workplace with Business Mission, Goals, and Objectives.

    ERIC Educational Resources Information Center

    Johnson, Sandra J.

    1994-01-01

    Discusses the management and evaluation of diversity in the workforce and emphasizes the need to link diversity issues with organizational goals and performance needs. Differences between a "quick fix" and systematic action are examined; distinctions between a program and a process are explained; and measuring results of diversity…

  18. Curriculum Change Management and Workload

    ERIC Educational Resources Information Center

    Alkahtani, Aishah

    2017-01-01

    This study examines the ways in which Saudi teachers have responded or are responding to the challenges posed by a new curriculum. It also deals with issues relating to workload demands which affect teachers' performance when they apply a new curriculum in a Saudi Arabian secondary school. In addition, problems such as scheduling and sharing space…

  19. Towards Zero Management Learning Organisations: A Honey-Bee Perspective

    ERIC Educational Resources Information Center

    O'Keeffe, Ted

    2005-01-01

    Purpose: This research paper is a distinctive element of an empirical study on learning organisations carried out between 1999 and 2002. It seeks to examine a whole range of issues that seem to permeate higher-performing organisations. Design/methodology/approach: The study design utilised both quantitative and qualitative research methodologies.…

  20. Examining Student Outcomes in University Computer Laboratory Environments: Issues for Educational Management

    ERIC Educational Resources Information Center

    Newby, Michael; Marcoulides, Laura D.

    2008-01-01

    Purpose: The purpose of this paper is to model the relationship between student performance, student attitudes, and computer laboratory environments. Design/methodology/approach: Data were collected from 234 college students enrolled in courses that involved the use of a computer to solve problems and provided the laboratory experience by means of…

  1. Assessment and Accountability in Youth Soccer: How Parents Grade Coaching, Refereeing, and the Soccer Infrastructure

    ERIC Educational Resources Information Center

    Duffus, Lee

    2012-01-01

    The term accountability is used extensively in performance management. In youth soccer, accountability is often discussed in the context of issues such as quality of coaching, officiating, responsiveness to stakeholders, scheduling of games, building parental involvement and support, and philosophical orientation to the sport. As part of the…

  2. A Mindtool-Based Collaborative Learning Approach to Enhancing Students' Innovative Performance in Management Courses

    ERIC Educational Resources Information Center

    Wu, Chih-Hsiang; Hwang, Gwo-Jen; Kuo, Fan-Ray; Huang, Iwen

    2013-01-01

    Educators have indicated that creative teaching is the most important educational activity; nevertheless, most existing education systems fail to engage students in effective creative tasks. To address this issue, this study proposes a mind map based collaborative learning approach for supporting creative learning activities and enhancing…

  3. The Balanced Scorecard as a management tool for assessing and monitoring strategy implementation in health care organizations.

    PubMed

    Bisbe, Josep; Barrubés, Joan

    2012-10-01

    Both prior literature and reported managerial practices have claimed that the Balanced Scorecard is a management tool that can help organizations to effectively implement strategies. In this article, we examine some of the contributions, dilemmas, and limitations of Balanced Scorecards in health care organizations. First, we describe the evolution of Balanced Scorecards from multidimensional performance measurement systems to causal representations of formulated strategies, and analyze the applicability of Balanced Scorecards in health care settings. Next, we discuss several issues under debate regarding Balanced Scorecard adoption in health care organizations. We distinguish between issues related to the design of Balanced Scorecards and those related to the use of these tools. We conclude that the Balanced Scorecard has the potential to contribute to the implementation of strategies through the strategically-oriented performance measurement systems embedded within it. However, effective adoption requires the adaptation of the generic instrument to the specific realities of health care organizations. Full English text available from:www.revespcardiol.org. Copyright © 2012 Sociedad Española de Cardiología. Published by Elsevier Espana. All rights reserved.

  4. Scenarios for the Hanford immobilized Low-Activity waste (ILAW) performance assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MANN, F.M.

    The purpose of the next version of the Hanford Immobilized Low-Activity Tank Waste (ILAW) Performance Assessment (ILAW PA) is to provide an updated estimate of the long-term human health and environmental impact of the disposal of ILAW and to compare these estimates against performance objectives displayed in Tables 1,2, and 3 (Mann 1999a). Such a radiological performance assessment is required by U.S. Department of Energy (DOE) Orders on radioactive waste management (DOE 1988a and DOE 1999a). This document defines the scenarios that will be used for the next update of the PA that is scheduled to be issued in 2001.more » Since the previous performance assessment (Mann 1998) was issued, considerable additional data on waste form behavior and site-specific soil geotechnical properties have been collected. In addition, the 2001 ILAW PA will benefit from improved computer models and the experience gained from the previous performance assessment. However, the scenarios (that is, the features, events, and processes analyzed in the Performance assessment) for the next PA are very similar to the ones in the 1998 PA.« less

  5. Using Online Databases in Corporate Issues Management.

    ERIC Educational Resources Information Center

    Thomsen, Steven R.

    1995-01-01

    Finds that corporate public relations practitioners felt they were able, using online database and information services, to intercept issues earlier in the "issue cycle" and thus enable their organizations to develop more "proactionary" or "catalytic" issues management repose strategies. (SR)

  6. Introduction

    Treesearch

    Sheila E. Ward; David Boshier; James Grogan

    2008-01-01

    This special issue of Forest Ecology and Management addresses management issues for the tropical timber species of the Meliaceae. The concept for this issue originated from a technical session entitled ..Sustainable management of highvalue timber species of the Meliaceae: a global perspective.., held at the 2005 World Congress of the International Union of Forest...

  7. Are you a strategist or just a manager?

    PubMed

    Hinterhuber, H H; Popp, W

    1992-01-01

    Perhaps the greatest strategist of all time was not a business executive but a general. Helmuth von Moltke, chief of the Prussian and German general staffs from 1858 to 1888, issued "directives" to his officers rather than specific commands. These guidelines for autonomous decision making encouraged Moltke's subordinates to show individual initiative. In this article, Hans Hinterhuber and Wolfgang Popp translate Moltke's example into business terms. According to Moltke, strategy is applied common sense and cannot be taught. The authors suggest that good entrepreneurs and managers--along with generals--are born with the qualities that make them successful. But even if managers have the potential to be good strategists, they must develop and hone their natural talents. And CEOs and top management can help by identifying and promoting such talents in their employees. Hinterhuber and Popp have created a questionnaire that helps measure strategic management competence. Managers and entrepreneurs take this test themselves, answering ten questions such as, "Do I have an entrepreneurial vision?", "Do I have a corporate philosophy?", and "Do I have competitive advantages?" Using the questionnaire, company management can evaluate managers being considered for a promotion. At the same time, those who take the test can use it to determine their own performance as strategists. Strategic managers provide subordinates with general guidelines, just as Helmuth von Moltke issued directives to his officers. And outstanding entrepreneurs create a corporate culture in which their vision, philosophy, and business strategies are implemented by employees who think independently.

  8. Issues in NASA Program and Project Management:: A Collection of Papers on Aerospace Management Issues (Supplement 11)

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1996-01-01

    Papers address the following topics: NASA's project management development process; Better decisions through structural analysis; NASA's commercial technology management system; Today's management techniques and tools; Program control in NASA - needs and opportunities; and Resources for NASA managers.

  9. Tools and Techniques for Evaluating the Effects of Maintenance Resource Management (MRM) in Air Safety

    NASA Technical Reports Server (NTRS)

    Taylor, James C.

    2002-01-01

    This research project was designed as part of a larger effort to help Human Factors (HF) implementers, and others in the aviation maintenance community, understand, evaluate, and validate the impact of Maintenance Resource Management (MRM) training programs, and other MRM interventions; on participant attitudes, opinions, behaviors, and ultimately on enhanced safety performance. It includes research and development of evaluation methodology as well as examination of psychological constructs and correlates of maintainer performance. In particular, during 2001, three issues were addressed. First a prototype process for measuring performance was developed and used. Second an automated calculator was developed to aid the HF implementer user in analyzing and evaluating local survey data. These results include being automatically compared with the experience from all MRM programs studied since 1991. Third the core survey (the Maintenance Resource Management Technical Operations Questionnaire, or 'MRM/TOQ') was further developed and tested to include topics of added relevance to the industry.

  10. Differing Perceptions Concerning Research Integrity Between Universities and Industry: A Qualitative Study.

    PubMed

    Godecharle, Simon; Nemery, Benoit; Dierickx, Kris

    2017-09-14

    Despite the ever increasing collaboration between industry and universities, the previous empirical studies on research integrity and misconduct excluded participants of biomedical industry. Hence, there is a lack of empirical data on how research managers and biomedical researchers active in industry perceive the issues of research integrity and misconduct, and whether or not their perspectives differ from those of researchers and research managers active in universities. If various standards concerning research integrity and misconduct are upheld between industry and universities, this might undermine research collaborations. Therefore we performed a qualitative study by conducting 22 semi-structured interviews in order to investigate and compare the perspectives and attitudes concerning the issues of research integrity and misconduct of research managers and biomedical researchers active in industry and universities. Our study showed clear discrepancies between both groups. Diverse strategies in order to manage research misconduct and to stimulate research integrity were observed. Different definitions of research misconduct were given, indicating that similar actions are judged heterogeneously. There were also differences at an individual level, whether the interviewees were active in industry or universities. Overall, the management of research integrity proves to be a difficult exercise, due to many diverse perspectives on several essential elements connected to research integrity and misconduct. A management policy that is not in line with the vision of the biomedical researchers and research managers is at risk of being inefficient.

  11. Integrated risk framework for onsite wastewater treatment systems.

    PubMed

    Carroll, Steven; Goonetilleke, Ashantha; Thomas, Evan; Hargreaves, Megan; Frost, Ray; Dawes, Les

    2006-08-01

    Onsite wastewater treatment systems (OWTS) are becoming increasingly important for the treatment and dispersal of effluent in new urbanised developments that are not serviced by centralised wastewater collection and treatment systems. However, the current standards and guidelines adopted by many local authorities for assessing suitable site and soil conditions for OWTS are increasingly coming under scrutiny due to the public health and environmental impacts caused by poorly performing systems, in particular septic tank-soil adsorption systems. In order to achieve sustainable onsite wastewater treatment with minimal impacts on the environment and public health, more appropriate means of assessment are required. This paper highlights an integrated risk based approach for assessing the inherent hazards associated with OWTS in order to manage and mitigate the environmental and public health risks inherent with onsite wastewater treatment. In developing a sound and cohesive integrated risk framework for OWTS, several key issues must be recognised. These include the inclusion of relevant stakeholders throughout framework development, the integration of scientific knowledge, data and analysis with risk assessment and management ideals, and identification of the appropriate performance goals for successful management and mitigation of associated risks. These issues were addressed in the development of the risk framework to provide a generic approach to assessing risk from OWTS. The utilisation of the developed risk framework for achieving more appropriate assessment and management techniques for OWTS is presented in a case study for the Gold Coast region, Queensland State, Australia.

  12. Integrated Risk Framework for Onsite Wastewater Treatment Systems

    NASA Astrophysics Data System (ADS)

    Carroll, Steven; Goonetilleke, Ashantha; Thomas, Evan; Hargreaves, Megan; Frost, Ray; Dawes, Les

    2006-08-01

    Onsite wastewater treatment systems (OWTS) are becoming increasingly important for the treatment and dispersal of effluent in new urbanised developments that are not serviced by centralised wastewater collection and treatment systems. However, the current standards and guidelines adopted by many local authorities for assessing suitable site and soil conditions for OWTS are increasingly coming under scrutiny due to the public health and environmental impacts caused by poorly performing systems, in particular septic tank-soil adsorption systems. In order to achieve sustainable onsite wastewater treatment with minimal impacts on the environment and public health, more appropriate means of assessment are required. This paper highlights an integrated risk based approach for assessing the inherent hazards associated with OWTS in order to manage and mitigate the environmental and public health risks inherent with onsite wastewater treatment. In developing a sound and cohesive integrated risk framework for OWTS, several key issues must be recognised. These include the inclusion of relevant stakeholders throughout framework development, the integration of scientific knowledge, data and analysis with risk assessment and management ideals, and identification of the appropriate performance goals for successful management and mitigation of associated risks. These issues were addressed in the development of the risk framework to provide a generic approach to assessing risk from OWTS. The utilisation of the developed risk framework for achieving more appropriate assessment and management techniques for OWTS is presented in a case study for the Gold Coast region, Queensland State, Australia.

  13. Changing personnel behavior to promote quality care practices in an intensive care unit

    PubMed Central

    Cooper, Dominic; Farmery, Keith; Johnson, Martin; Harper, Christine; Clarke, Fiona L; Holton, Phillip; Wilson, Susan; Rayson, Paul; Bence, Hugh

    2005-01-01

    The delivery of safe high quality patient care is a major issue in clinical settings. However, the implementation of evidence-based practice and educational interventions are not always effective at improving performance. A staff-led behavioral management process was implemented in a large single-site acute (secondary and tertiary) hospital in the North of England for 26 weeks. A quasi-experimental, repeated-measures, within-groups design was used. Measurement focused on quality care behaviors (ie, documentation, charting, hand washing). The results demonstrate the efficacy of a staff-led behavioral management approach for improving quality-care practices. Significant behavioral change (F [6, 19] = 5.37, p < 0.01) was observed. Correspondingly, statistically significant (t-test [t] = 3.49, df = 25, p < 0.01) reductions in methicillin-resistant Staphylococcus aureus (MRSA) were obtained. Discussion focuses on implementation issues. PMID:18360574

  14. Real-time artificial intelligence issues in the development of the adaptive tactical navigator

    NASA Technical Reports Server (NTRS)

    Green, Peter E.; Glasson, Douglas P.; Pomarede, Jean-Michel L.; Acharya, Narayan A.

    1987-01-01

    Adaptive Tactical Navigation (ATN) is a laboratory prototype of a knowledge based system to provide navigation system management and decision aiding in the next generation of tactical aircraft. ATN's purpose is to manage a set of multimode navigation equipment, dynamically selecting the best equipment to use in accordance with mission goals and phase, threat environment, equipment malfunction status, and battle damage. ATN encompasses functions as diverse as sensor data interpretation, diagnosis, and planning. Real time issues that were identified in ATN and the approaches used to address them are addressed. Functional requirements and a global architecture for the ATN system are described. Decision making with time constraints are discussed. Two subproblems are identified; making decisions with incomplete information and with limited resources. Approaches used in ATN to address real time performance are described and simulation results are discussed.

  15. Challenges in Hospital-Associated Infection Management: A Unit Perspective.

    PubMed

    Stacy, Kathleen M

    2015-01-01

    Maintaining a successful unit-based continuous quality improvement program for managing hospital-associated infections is a huge challenge and an overwhelming task. It requires strong organizational support and unit leadership, human and fiscal resources, time, and a dedicated and motivated nursing staff. A great deal of effort goes into implementing, monitoring, reporting, and evaluating quality improvement initiatives and can lead to significant frustration on the part of the leadership team and nursing staff when quality improvement efforts fail to produce the desired results. Each initiative presents its own unique set of challenges; however, common issues influence all initiatives. These common issues include organization and unit culture, current clinical practice guidelines being used to drive the initiatives, performance discrepancies on the part of nursing staff, availability of resources including equipment and supplies, monitoring of the data, and conflicting quality improvement priorities.

  16. E-waste Management and Refurbishment Prediction (EMARP) Model for Refurbishment Industries.

    PubMed

    Resmi, N G; Fasila, K A

    2017-10-01

    This paper proposes a novel algorithm for establishing a standard methodology to manage and refurbish e-waste called E-waste Management And Refurbishment Prediction (EMARP), which can be adapted by refurbishing industries in order to improve their performance. Waste management, particularly, e-waste management is a serious issue nowadays. Computerization has been into waste management in different ways. Much of the computerization has happened in planning the waste collection, recycling and disposal process and also managing documents and reports related to waste management. This paper proposes a computerized model to make predictions for e-waste refurbishment. All possibilities for reusing the common components among the collected e-waste samples are predicted, thus minimizing the wastage. Simulation of the model has been done to analyse the accuracy in the predictions made by the system. The model can be scaled to accommodate the real-world scenario. Copyright © 2017 Elsevier Ltd. All rights reserved.

  17. Review of performance, medical, and operational data on pilot aging issues

    NASA Technical Reports Server (NTRS)

    Stoklosa, J. H.

    1992-01-01

    An extensive review of the literature and studies relating to performance, medical, operational, and legal data regarding pilot aging issues was performed in order to determine what evidence there is, if any, to support mandatory pilot retirement. Popular misconceptions about aging, including the failure to distinguish between the normal aging process and disease processes that occur more frequently in older individuals, continue to contribute to much of the misunderstanding and controversy that surround this issue. Results: Review of medical data related to the pilot aging issue indicate that recent improvement in medical diagnostics and treatment technology have made it possible to identify to a high degree individuals who are at risk for developing sudden incapacitating illness and for treating those with disqualifying medical conditions. Performance studies revealed that after controlling for the presence of disease states, older pilots are able to perform as well as younger pilots on many performance tasks. Review of accident data showed that older, healthy pilots do not have higher accident rates than younger pilots, and indeeed, evidence suggests that older pilots have an advantage in the cockpit due to higher experience levels. The Man-Machine-Mission-Environment interface of factors can be managed through structured, supervised, and enhanced operations, maintenance, flight reviews, and safety procedures in order to ensure safe and productive operations by reducing the margin of error and by increasing the margin of safety. Conclusions: There is no evidence indicating any specific age as an arbitrary cut-off point for pilots to perform their fight duties. A combination of regular medical screening, performance evaluation, enhanced operational maintenance, and safety procedures can most effectively ensure a safe pilot population than can a mandatory retirement policy based on arbitrary age restrictions.

  18. Integrating fisheries approaches and household utility models for improved resource management.

    PubMed

    Milner-Gulland, E J

    2011-01-25

    Natural resource management is littered with cases of overexploitation and ineffectual management, leading to loss of both biodiversity and human welfare. Disciplinary boundaries stifle the search for solutions to these issues. Here, I combine the approach of management strategy evaluation, widely applied in fisheries, with household utility models from the conservation and development literature, to produce an integrated framework for evaluating the effectiveness of competing management strategies for harvested resources against a range of performance metrics. I demonstrate the strengths of this approach with a simple model, and use it to examine the effect of manager ignorance of household decisions on resource management effectiveness, and an allocation tradeoff between monitoring resource stocks to reduce observation uncertainty and monitoring users to improve compliance. I show that this integrated framework enables management assessments to consider household utility as a direct metric for system performance, and that although utility and resource stock conservation metrics are well aligned, harvest yield is a poor proxy for both, because it is a product of household allocation decisions between alternate livelihood options, rather than an end in itself. This approach has potential far beyond single-species harvesting in situations where managers are in full control; I show that the integrated approach enables a range of management intervention options to be evaluated within the same framework.

  19. Scaling up antiretroviral therapy in Uganda: using supply chain management to appraise health systems strengthening.

    PubMed

    Windisch, Ricarda; Waiswa, Peter; Neuhann, Florian; Scheibe, Florian; de Savigny, Don

    2011-08-01

    Strengthened national health systems are necessary for effective and sustained expansion of antiretroviral therapy (ART). ART and its supply chain management in Uganda are largely based on parallel and externally supported efforts. The question arises whether systems are being strengthened to sustain access to ART. This study applies systems thinking to assess supply chain management, the role of external support and whether investments create the needed synergies to strengthen health systems. This study uses the WHO health systems framework and examines the issues of governance, financing, information, human resources and service delivery in relation to supply chain management of medicines and the technologies. It looks at links and causal chains between supply chain management for ART and the national supply system for essential drugs. It combines data from the literature and key informant interviews with observations at health service delivery level in a study district. Current drug supply chain management in Uganda is characterized by parallel processes and information systems that result in poor quality and inefficiencies. Less than expected health system performance, stock outs and other shortages affect ART and primary care in general. Poor performance of supply chain management is amplified by weak conditions at all levels of the health system, including the areas of financing, governance, human resources and information. Governance issues include the lack to follow up initial policy intentions and a focus on narrow, short-term approaches. The opportunity and need to use ART investments for an essential supply chain management and strengthened health system has not been exploited. By applying a systems perspective this work indicates the seriousness of missing system prerequisites. The findings suggest that root causes and capacities across the system have to be addressed synergistically to enable systems that can match and accommodate investments in disease-specific interventions. The multiplicity and complexity of existing challenges require a long-term and systems perspective essentially in contrast to the current short term and program-specific nature of external assistance.

  20. Evolution from safety management system (SMS) to HSE MS: Incorporating health aspects into the HSE management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jong, G. de

    1996-12-31

    There is increasing recognition within the E&P industry that protection and promotion of the health of people at work is more than taking care of individual health. It is an organizational issue which can be managed using the same principles as for safety and environment. The synergy`s with safety and environmental management provide the link with the management system. However line managers need to under the critical Health issues: what are they are they relevant? How do we manage them? what are the standards? What are the management tools to be used? How do we monitor performance? What is themore » role of the line? What is the role of the health advisers? What training and competencies are needed for health management? What are the benefits? These questions have to be clarified before acceptance can be achieved for full integration of Health aspects into the HSE Management System. Health Risk Assessment was developed as a tool for systematic identification and assessment of health hazards and risks. It specifies the need for and type of controls and recovery measures, which can subsequently be incorporated in HSE Management System and HSE Cases. Our experience to date indicates that Health can successfully be integrated in HSE Management Systems and HSE Cases by using the same principles as developed for Safety Management Systems and Safety Cases. There are still many problems which need to be addressed but the methodology used appears to be sound and will eventually enhance line management understanding of the health management aspects relevant to the E&P Industry.« less

  1. Analysis of Factors Influencing Building Refurbishment Project Performance

    NASA Astrophysics Data System (ADS)

    Ishak, Nurfadzillah; Aswad Ibrahim, Fazdliel; Azizi Azizan, Muhammad

    2018-03-01

    Presently, the refurbishment approach becomes favourable as it creates opportunities to incorporate sustainable value with other building improvement. In this regard, this approach needs to be implemented due to the issues on overwhelming ratio of existing building to new construction, which also can contribute to the environmental problem. Refurbishment principles imply to minimize the environmental impact and upgrading the performance of an existing building to meet new requirements. In theoretically, building project's performance has a direct bearing on related to its potential for project success. However, in refurbishment building projects, the criteria for measure are become wider because the projects are a complex and multi-dimensional which encompassing many factors which reflect to the nature of works. Therefore, this impetus could be achieve by examine the direct empirical relationship between critical success factors (CSFs) and complexity factors (CFs) during managing the project in relation to delivering success on project performance. The research findings will be expected as the basis of future research in establish appropriate framework that provides information on managing refurbishment building projects and enhancing the project management competency for a better-built environment.

  2. Incentive Issues in Information Security Management

    ERIC Educational Resources Information Center

    Lee, Chul Ho

    2012-01-01

    This dissertation studies three incentive issues in information security management. The first essay studies contract issues between a firm that outsources security functions and a managed security service provider (MSSP) that provides security functions to the firm. Since MSSP and firms cannot observe each other's actions, both can suffer…

  3. Ethical issues in the diagnosis and management of fetal disorders.

    PubMed

    Chadwick, Ruth; Childs, Richardo

    2012-10-01

    The ethics of diagnosis and management of fetal genetic disorders are particularly controversial because of the contested status of the fetus and perceptions of genetics. An additional complicating factor is the potential conflict between mother and fetus. Ethical issues in diagnosis include the nature and purpose of the diagnosis itself, and management of the information. Management of the disorder includes issues of termination as an option, and the emerging field of fetal gene therapy with associated issues of somatic versus germ-line interventions. Copyright © 2012 Elsevier Ltd. All rights reserved.

  4. Digital electronic engine control history

    NASA Technical Reports Server (NTRS)

    Putnam, T. W.

    1984-01-01

    Full authority digital electronic engine controls (DEECs) were studied, developed, and ground tested because of projected benefits in operability, improved performance, reduced maintenance, improved reliability, and lower life cycle costs. The issues of operability and improved performance, however, are assessed in a flight test program. The DEEC on a F100 engine in an F-15 aircraft was demonstrated and evaluated. The events leading to the flight test program are chronicled and important management and technical results are identified.

  5. Status of ISS Water Management and Recovery

    NASA Technical Reports Server (NTRS)

    Carter, Layne; Wilson, Laura Labuda; Orozco, Nicole

    2012-01-01

    Water management on ISS is responsible for the provision of water to the crew for drinking water, food preparation, and hygiene, to the Oxygen Generation System (OGS) for oxygen production via electrolysis, to the Waste & Hygiene Compartment (WHC) for flush water, and for experiments on ISS. This paper summarizes water management activities on the ISS US Segment, and provides a status of the performance and issues related to the operation of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA). This paper summarizes the on-orbit status as of May 2011, and describes the technical challenges encountered and lessons learned over the past year.

  6. Motion/imagery secure cloud enterprise architecture analysis

    NASA Astrophysics Data System (ADS)

    DeLay, John L.

    2012-06-01

    Cloud computing with storage virtualization and new service-oriented architectures brings a new perspective to the aspect of a distributed motion imagery and persistent surveillance enterprise. Our existing research is focused mainly on content management, distributed analytics, WAN distributed cloud networking performance issues of cloud based technologies. The potential of leveraging cloud based technologies for hosting motion imagery, imagery and analytics workflows for DOD and security applications is relatively unexplored. This paper will examine technologies for managing, storing, processing and disseminating motion imagery and imagery within a distributed network environment. Finally, we propose areas for future research in the area of distributed cloud content management enterprises.

  7. Status of ISS Water Management and Recovery

    NASA Technical Reports Server (NTRS)

    Carter, Layne; Pruitt, Jennifer; Brown, Christopher A.; Bazley, Jesse; Gazda, Daniel; Schaezler, Ryan; Bankers, Lyndsey

    2016-01-01

    Water management on ISS is responsible for the provision of water to the crew for drinking water, food preparation, and hygiene, to the Oxygen Generation System (OGS) for oxygen production via electrolysis, to the Waste & Hygiene Compartment (WHC) for flush water, and for experiments on ISS. This paper summarizes water management activities on the ISS US Segment and provides a status of the performance and issues related to the operation of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA). This paper summarizes the on-orbit status as of May 2016 and describes the technical challenges encountered and lessons learned over the past year.

  8. Status of ISS Water Management and Recovery

    NASA Technical Reports Server (NTRS)

    Carter, Layne; Brown, Christopher; Orozco, Nicole

    2014-01-01

    Water management on ISS is responsible for the provision of water to the crew for drinking water, food preparation, and hygiene, to the Oxygen Generation System (OGS) for oxygen production via electrolysis, to the Waste & Hygiene Compartment (WHC) for flush water, and for experiments on ISS. This paper summarizes water management activities on the ISS US Segment, and provides a status of the performance and issues related to the operation of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA). This paper summarizes the on-orbit status as of June 2013, and describes the technical challenges encountered and lessons learned over the past year.

  9. Status of ISS Water Management and Recovery

    NASA Technical Reports Server (NTRS)

    Carter, Layne; Tobias, Barry; Orozco, Nicole

    2012-01-01

    Water management on ISS is responsible for the provision of water to the crew for drinking water, food preparation, and hygiene, to the Oxygen Generation System (OGS) for oxygen production via electrolysis, to the Waste & Hygiene Compartment (WHC) for flush water, and for experiments on ISS. This paper summarizes water management activities on the ISS US Segment, and provides a status of the performance and issues related to the operation of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA). This paper summarizes the on-orbit status as of June 2012, and describes the technical challenges encountered and lessons learned over the past year.

  10. Improving Performance of the System Safety Function at Marshall Space Flight Center

    NASA Technical Reports Server (NTRS)

    Kiessling, Ed; Tippett, Donald D.; Shivers, Herb

    2004-01-01

    The Columbia Accident Investigation Board (CAIB) determined that organizational and management issues were significant contributors to the loss of Space Shuttle Columbia. In addition, the CAIB observed similarities between the organizational and management climate that preceded the Challenger accident and the climate that preceded the Columbia accident. To prevent recurrence of adverse organizational and management climates, effective implementation of the system safety function is suggested. Attributes of an effective system safety program are presented. The Marshall Space Flight Center (MSFC) system safety program is analyzed using the attributes. Conclusions and recommendations for improving the MSFC system safety program are offered in this case study.

  11. Status of ISS Water Management and Recovery

    NASA Technical Reports Server (NTRS)

    Carter, Layne; Takada, Kevin; Gazda, Daniel; Brown, Christopher; Bazley, Jesse; Schaezler, Ryan; Bankers, Lyndsey

    2017-01-01

    Water management on ISS is responsible for the provision of water to the crew for drinking water, food preparation, and hygiene, to the Oxygen Generation System (OGS) for oxygen production via electrolysis, to the Waste & Hygiene Compartment (WHC) for flush water, and for experiments on ISS. This paper summarizes water management activities on the ISS US Segment and provides a status of the performance and issues related to the operation of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA). This paper summarizes the on-orbit status as of June 2017 and describes the technical challenges encountered and lessons learned over the past year.

  12. Status of ISS Water Management and Recovery

    NASA Technical Reports Server (NTRS)

    Carter, Layne; Pruitt, Jennifer; Brown, Christopher A.; Schaezler, Ryan; Bankers, Lyndsey

    2015-01-01

    Water management on ISS is responsible for the provision of water to the crew for drinking water, food preparation, and hygiene, to the Oxygen Generation System (OGS) for oxygen production via electrolysis, to the Waste & Hygiene Compartment (WHC) for flush water, and for experiments on ISS. This paper summarizes water management activities on the ISS US Segment, and provides a status of the performance and issues related to the operation of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA). This paper summarizes the on-orbit status as of May 2015 and describes the technical challenges encountered and lessons learned over the past two years.

  13. Performance management of the public healthcare services in Ireland: a review.

    PubMed

    Mesabbah, Mohammed; Arisha, Amr

    2016-01-01

    Performance Management (PM) processes have become a potent part of strategic and service quality decisions in healthcare organisations. In 2005, the management of public healthcare in Ireland was amalgamated into a single integrated management body, named the Health Service Executive (HSE). Since then, the HSE has come up with a range of strategies for healthcare developments and reforms, and has developed a PM system as part of its strategic planning. The purpose of this paper is to review the application of PM in the Irish Healthcare system, with a particular focus on Irish Hospitals and Emergency Services. An extensive review of relevant HSE's publications from 2005 to 2013 is conducted. Studies of the relevant literature related to the application of PM and of international best practices in healthcare performance systems are also presented. PM and performance measurement systems used by the HSE include many performance reports designed to monitor performance trends and strategic goals. Issues in the current PM system include inconsistency of measures and performance reporting, unclear strategy alignment, and deficiencies in reporting (e.g. feedback and corrective actions). Furthermore, PM processes have not been linked adequately into Irish public hospitals' management systems. The HSE delivers several services such as mental health, social inclusion, etc. This study focuses on the HSE's PM framework, with a particular interest in acute hospitals and emergency services. This is the first comprehensive review of Irish healthcare PM since the introduction of the HSE. A critical analysis of the HSE reports identifies the shortcomings in its current PM system.

  14. Independent Orbiter Assessment (IOA): FMEA/CIL instructions and ground rules

    NASA Technical Reports Server (NTRS)

    Traves, S. T.

    1986-01-01

    The McDonnell Douglas Astronautics Company was selected to conduct an independent assessment of the Orbiter Failure Mode and Effects Analysis/Critical Items List (FMEA/CIL). Part of this effort involved an examination of the FMEA/CIL preparation instructions and ground rules. Assessment objectives were to identify omissions and ambiguities in the ground rules that may impede the identification of shuttle orbiter safety and mission critical items, and to ensure that ground rules allow these items to receive proper management visibility for risk assessment. Assessment objectives were followed during the performance of the assessment without being influenced by external considerations such as effects on budget, schedule, and documentation growth. Assessment personnel were employed who had a strong reliability background but no previous space shuttle FMEA/CIL experience to ensure an independent assessment would be achieved. The following observations were made: (1) not all essential items are in the CIL for management visibility; (2) ground rules omit FMEA/CIL coverage of items that perform critical functions; (3) essential items excluded from the CIL do not receive design justification; and (4) FMEAs/CILs are not updated in a timely manner. In addition to the above issues, a number of other issues were identified that correct FMEA/CIL preparation instruction omissions and clarify ambiguities. The assessment was successful in that many of the issues have significant safety implications.

  15. Patients' Perspective on the Value of Medication Management Appointments.

    PubMed

    Cruz, Mario; Cruz, Robyn Flaum; Pincus, Harold Alan

    2015-05-20

    There is ongoing concern that psychiatric medication management appointments add little value to care. The present study attempted to address this concern by capturing depressed patients' views and opinions about the value of psychiatric medication management appointments. Seventy-eight semi-structured interviews were performed with white and African American depressed patients post medication management appointments. These interviews tapped patients' views and opinions about the value of attending medication management appointments. An iterative thematic analysis was performed. Patients reported greater appointment value when appointments included obtaining medications, discussing the need for medication changes or dose adjustments, and discussing the impact of medications on their illness. Additionally, greater appointment value was perceived by patients when there were non-medical conversations about life issues, immediate outcomes from the appointment such as motivation to continue in care, and specific qualities of providers that were appealing to patients. Patients' perceived value of psychiatric medication management appointments is complex. Though important patient outcomes are obtaining medicine and perceiving improvement in their mental health, there are other valued appointment and provider factors. Some of these other valued factors embedded within medication management appointments could have therapeutic properties. These findings have implications for future clinical research and service delivery.

  16. Conducting effective performance appraisals.

    PubMed

    2001-01-01

    According to experts, performance appraisals rate just below firing someone as the least favorite thing managers do. Many factors contribute to this view--one is that current systems do a poor job of evaluating performance and in fact often impede both evaluation and performance. When used as part of an ongoing supportive process of goal setting and feedback, performance appraisals can enhance performance and morale. One alternative to traditional employee evaluation methods is full-circle or 360-degree feedback. Contained in this issue are practical suggestions for preparing employees for performance appraisals which, when followed daily, encourage employees to put their best feet forward as part of their regular routine. Also included is a template specific to assessing the performance of clinical laboratory technologists . Additionally, numerous resources are provided to help you refine appraisal systems to fit your needs. Full-circle feedback is proving to be a boon to managers. It relieves them from being the exclusive "heavies" in evaluating performance, integrates appraisal input from several sources, and incorporates increasing employee skills, competencies, and satisfaction, thus improving productivity of people and processes. And aren't integration and continuous improvement what the laboratory is all about?

  17. Strategic Issues for Training.

    ERIC Educational Resources Information Center

    Pollitt, David, Ed.

    1999-01-01

    Contains precis of 18 articles on strategic management issues, including management development, on-the-job training, corporate scholarship, educational technology, coaching, investing in intellectual capital, and knowledge management. (SK)

  18. Description of the SSF PMAD DC testbed control system data acquisition function

    NASA Technical Reports Server (NTRS)

    Baez, Anastacio N.; Mackin, Michael; Wright, Theodore

    1992-01-01

    The NASA LeRC in Cleveland, Ohio has completed the development and integration of a Power Management and Distribution (PMAD) DC Testbed. This testbed is a reduced scale representation of the end to end, sources to loads, Space Station Freedom Electrical Power System (SSF EPS). This unique facility is being used to demonstrate DC power generation and distribution, power management and control, and system operation techniques considered to be prime candidates for the Space Station Freedom. A key capability of the testbed is its ability to be configured to address system level issues in support of critical SSF program design milestones. Electrical power system control and operation issues like source control, source regulation, system fault protection, end-to-end system stability, health monitoring, resource allocation, and resource management are being evaluated in the testbed. The SSF EPS control functional allocation between on-board computers and ground based systems is evolving. Initially, ground based systems will perform the bulk of power system control and operation. The EPS control system is required to continuously monitor and determine the current state of the power system. The DC Testbed Control System consists of standard controllers arranged in a hierarchical and distributed architecture. These controllers provide all the monitoring and control functions for the DC Testbed Electrical Power System. Higher level controllers include the Power Management Controller, Load Management Controller, Operator Interface System, and a network of computer systems that perform some of the SSF Ground based Control Center Operation. The lower level controllers include Main Bus Switch Controllers and Photovoltaic Controllers. Power system status information is periodically provided to the higher level controllers to perform system control and operation. The data acquisition function of the control system is distributed among the various levels of the hierarchy. Data requirements are dictated by the control system algorithms being implemented at each level. A functional description of the various levels of the testbed control system architecture, the data acquisition function, and the status of its implementationis presented.

  19. Reflections: Management Morphology--How We Got To Be Who We Are.

    ERIC Educational Resources Information Center

    Hoadley, Irene B.

    1999-01-01

    Reviews library management issues over the past 25 years. Highlights include library education for managerial skills; on the job training; gender issues; societal factors; Total Quality Management; management changes; and future possibilities, including managerial roles, management models, and organizational structure. (LRW)

  20. System Wide Information Management (SWIM)

    NASA Technical Reports Server (NTRS)

    Hritz, Mike; McGowan, Shirley; Ramos, Cal

    2004-01-01

    This viewgraph presentation lists questions regarding the implementation of System Wide Information Management (SWIM). Some of the questions concern policy issues and strategies, technology issues and strategies, or transition issues and strategies.

  1. Principles and practices board. Issue Analysis 98-1. Compliance with laws and regulations for healthcare organizations. Healthcare Financial Management Association.

    PubMed

    1998-09-01

    This is the third Issue Analysis of HFMA's Principles and Practices (P&P) Board. The P&P Board writes an Issue Analysis in response to the need for practical information on emerging issues in healthcare financial management. An Issue Analysis is factual but not authoritative. It is not sent out for public comment and provides the healthcare industry short-term assistance on emerging issues. The purpose of P&P Board Issue Analysis 98-1, Compliance with Laws and Regulations for Healthcare Organizations, is to help healthcare financial managers understand their responsibility to implement and maintain an effective internal control system to ensure compliance with laws and regulations.

  2. 13 CFR 107.250 - Exclusion of stock options issued by Licensee from Management Expenses.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Sbic § 107.250 Exclusion of stock options issued by Licensee from Management Expenses. Stock options... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Exclusion of stock options issued by Licensee from Management Expenses. 107.250 Section 107.250 Business Credit and Assistance SMALL...

  3. 77 FR 59221 - Information Collection Activities: Timpanogos Cave National Monument Visitor and Community Survey

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-26

    ... of how each of the above management issue affects their overall quality of visit experience. Visitors... collect visitors and local community members' perceptions and evaluations of four management issues (1... management issues: (1) Cave tour size and frequency. (2) Ticketing process and fees. (3) Concession service...

  4. The management of animal bites in the United kingdom.

    PubMed

    Evgeniou, E; Markeson, D; Iyer, S; Armstrong, A

    2013-01-01

    Animal bites represent a significant global health issue. The evidence in the literature regarding their management in many areas is conflicting and unclear. This project attempts to identify current evidence in the literature on the management of animal bites and assess if current practice in the United Kingdom is evidence based. A literature review on the management of animal bites was performed, and a national UK survey was contacted using a questionnaire based on the available evidence in the literature. The results from this survey show that 98% of plastic surgery units routinely use prophylactic antibiotics in all animal bite wounds; 58% close low-risk injuries primarily after initial washout, and there are conflicting opinions regarding the management of associated fractures and soft tissue injuries. The available data in the literature suggest that appropriate wound management is the most important factor for prevention of infection in animal bites. Antibiotic prophylaxis should only be given in high-risk wounds and primary closure should be performed in low-risk wounds. The management protocols of many plastic surgery units often diverge from the available evidence within the literature. On the basis of a thorough literature review, a guideline for the management of animal bites is presented. Future studies should investigate the management of associated fractures and soft tissue injuries.

  5. The Corporate Library and Issues Management.

    ERIC Educational Resources Information Center

    Lancaster, F. W.; Loescher, Jane

    1994-01-01

    Discussion of corporate library services and the role of the librarian focuses on the recognition and tracking of issues of potential significance to the corporation, or issues management. Topics addressed include environmental scanning of relevant literature, and the use of databases to track issues. (16 references) (LRW)

  6. Issues Management and the Use of Technologies in Public Relations.

    ERIC Educational Resources Information Center

    Ramsey, Shirley A.

    1993-01-01

    Finds that members of the Issues Management Association were more positively involved with two procedures--"environmental scanning for emerging issues" and "developing communication plans about the issues"--than were other public relations practitioners. Finds that respondents were highly likely to use advanced communication…

  7. Centralized remote structural monitoring and management of real-time data

    NASA Astrophysics Data System (ADS)

    Han, Liting; Newhook, John P.; Mufti, Aftab A.

    2004-07-01

    Structural health monitoring (SHM) activities in civil engineering are increasing at a rapid pace in both research and field applications. This paper addresses the specific issue of incorporating internet technology into a structural health monitoring program. The issue of data volume versus communication speed is discussed along with a practical solution employed by ISIS Canada. The approach is illustrated through reference to several current case studies which include two bridges and a statue. It is seen that although the specifics of the projects and monitoring needs are different, the manner in which on-line monitoring can be conducted is very similar and easily allows for centralized monitoring. A general framework for website construction integrating sensing data and web camera options are presented. Issues related to simple real-time performance indices versus more comprehensive complex data analysis are discussed. Examples of on-line websites which allow visualization of new and historic data are presented. The paper also discusses future activities and research needs related to centralized remote structural monitoring and management of real-time data.

  8. Sustainability of cement kiln co-processing of wastes in India: a pilot study.

    PubMed

    Baidya, Rahul; Ghosh, Sadhan Kumar; Parlikar, Ulhas V

    2017-07-01

    Co-processing in cement kiln achieves effective utilization of the material and energy value present in the wastes, thereby conserving the natural resources by reducing the use of virgin material. In India, a number of multifolded initiatives have been taken that take into account the potential and volume of waste generation. This paper studies the factors which might influence the sustainability of co-processing of waste in cement kilns as a business model, considering the issues and challenges in the supply chain framework in India in view of the four canonical pillars of sustainability. A pilot study on co-processing was carried out in one of the cement plant in India to evaluate the environmental performance, economical performance, operational performance and social performance. The findings will help India and other developing countries to introduce effective supply chain management for co-processing while addressing the issues and challenges during co-processing of different waste streams in the cement kilns.

  9. An Assessment of Civil Tiltrotor Concept of Operations in the Next Generation Air Transportation System

    NASA Technical Reports Server (NTRS)

    Chung, William W.; Salvano, Dan; Rinehart, David; Young, Ray; Cheng, Victor; Lindsey, James

    2012-01-01

    Based on a previous Civil Tiltrotor (CTR) National Airspace System (NAS) performance analysis study, CTR operations were evaluated over selected routes and terminal airspace configurations assuming noninterference operations (NIO) and runway-independent operations (RIO). This assessment aims to further identify issues associated with these concepts of operations (ConOps), and their dependency on the airspace configuration and interaction with conventional fixed-wing traffic. Safety analysis following a traditional Safety Management System (SMS) methodology was applied to CTR-unique departure and arrival failures in the selected airspace to identify any operational and certification issues. Additional CTR operational cases were then developed to get a broader understanding of issues and gaps that will need to be addressed in future CTR operational studies. Finally, needed enhancements to National Airspace System performance analysis tools were reviewed, and recommendations were made on improvements in these tools that are likely to be required to support future progress toward CTR fleet operations in the Next Generation Air Transportation System (NextGen).

  10. Community Schools in Ohio: Implementation Issues and Impact on Ohio's Education System. Volume I.

    ERIC Educational Resources Information Center

    Ohio State Legislative Office of Education Oversight, Columbus.

    Community schools were created in Ohio to provide additional educational options for children in low-performing schools and to develop innovative teaching and management techniques that may be transferable to traditional public schools. In 1997 the Ohio General Assembly required the Legislative Office of Education Oversight (LOEO) to evaluate the…

  11. Knowledge Enriched Learning by Converging Knowledge Object & Learning Object

    ERIC Educational Resources Information Center

    Sabitha, Sai; Mehrotra, Deepti; Bansal, Abhay

    2015-01-01

    The most important dimension of learning is the content, and a Learning Management System (LMS) suffices this to a certain extent. The present day LMS are designed to primarily address issues like ease of use, search, content and performance. Many surveys had been conducted to identify the essential features required for the improvement of LMS,…

  12. Using the Arts to Raise Awareness and Communicate Environmental Information in the Extension Context

    ERIC Educational Resources Information Center

    Curtis, David J.

    2011-01-01

    Extension services face an increasing challenge as the state of Australia's environment declines. It is, therefore, opportune to explore some innovations in the way extension is traditionally delivered. This paper introduces the concept of the visual and performing arts being useful in extension of natural resources management issues such as land…

  13. Globalization and the Inward Flow of Immigrants: Issues Associated with the Inpatriation of Global Managers

    ERIC Educational Resources Information Center

    Harvey, Michael; Kiessling, Tim; Moeller, Miriam

    2011-01-01

    Assembling a diverse global workforce is becoming a critical dimension in gaining successful global performance. In the past, staffing has focused on control of the multinational organization as the primary goal when staffing overseas positions. As organizations globalize their operations, the goal of staffing is shifting from control to…

  14. An Empirical Investigation of Pre-Project Partnering Activities on Project Performance in the Software Industry

    ERIC Educational Resources Information Center

    Proffitt, Curtis K.

    2012-01-01

    Project failure remains a challenge within the software development field especially during the early stages of the IT project development. Despite the herculean efforts by project managers and organizations to identify and offset problems, projects remain plagued with issues. If these challenges are not mitigated, to a successful degree,…

  15. 45 CFR 2522.640 - Under what circumstances may I change my performance measures?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Corporation or, for formula programs, the State commission, approves your request to do so based on your need... are more realistic and manageable; (2) Replace a measure related to one issue area with one related to... need to replace an objective related to health with one related to the environment; (3) Redefine the...

  16. Special issue on the "Consortium for Advanced Simulation of Light Water Reactors Research and Development Progress"

    NASA Astrophysics Data System (ADS)

    Turinsky, Paul J.; Martin, William R.

    2017-04-01

    In this special issue of the Journal of Computational Physics, the research and development completed at the time of manuscript submission by the Consortium for Advanced Simulation of Light Water Reactors (CASL) is presented. CASL is the first of several Energy Innovation Hubs that have been created by the Department of Energy. The Hubs are modeled after the strong scientific management characteristics of the Manhattan Project and AT&T Bell Laboratories, and function as integrated research centers that combine basic and applied research with engineering to accelerate scientific discovery that addresses critical energy issues. Lifetime of a Hub is expected to be five or ten years depending upon performance, with CASL being granted a ten year lifetime.

  17. Gynaecological issues affecting the obese adolescent.

    PubMed

    Wood, Paul L; Bauman, Dvora

    2015-05-01

    The implications of obesity in childhood and adolescence resonate into adulthood and have implications at different levels that include psychosocial and health issues that impact beyond reproductive performance. This chapter explores the various facets and consequences on gynaecological issues of increased Body Mass Index in childhood, including the link with puberty, pubertal menorrhagia (also affecting children with complex needs) and the all too common problems surrounding hyperandrogenism, insulin resistance and the polycystic ovarian syndrome in particular which need to be seen in the specific context of the adolescent years. The wider ramifications of obesity on the psychosocial welfare of adolescents merits special attention. Finally management strategies are considered in the context of the needs of adolescents. Crown Copyright © 2014. Published by Elsevier Ltd. All rights reserved.

  18. Management of pediatric patients with refractory constipation who fail cecostomy.

    PubMed

    Bonilla, Silvana F; Flores, Alejandro; Jackson, Carl-Christian A; Chwals, Walter J; Orkin, Bruce A

    2013-09-01

    Antegrade continence enema (ACE) is a recognized therapeutic option in the management of pediatric refractory constipation. Data on the long-term outcome of patients who fail to improve after an ACE-procedure are lacking. To describe the rate of ACE bowel management failure in pediatric refractory constipation, and the management and long term outcome of these patients. Retrospective analysis of a cohort of patients that underwent ACE-procedure and had at least 3-year-follow-up. Detailed analysis of subsequent treatment and outcome of those patients with a poor functional outcome was performed. 76 patients were included. 12 (16%) failed successful bowel management after ACE requiring additional intervention. Mean follow-up was 66.3 (range 35-95 months) after ACE-procedure. Colonic motility studies demonstrated colonic neuropathy in 7 patients (58%); abnormal motility in 4 patients (33%), and abnormal left-sided colonic motility in 1 patient (9%). All 12 patients were ultimately treated surgically. Nine patients (75%) had marked clinical improvement, whereas 3 patients (25%) continued to have poor function issues at long term follow-up. Colonic resection, either segmental or total, led to improvement or resolution of symptoms in the majority of patients who failed cecostomy. However, this is a complex and heterogeneous group and some patients will have continued issues. Copyright © 2013 Elsevier Inc. All rights reserved.

  19. A review of passive thermal management of LED module

    NASA Astrophysics Data System (ADS)

    Huaiyu, Ye; Koh, Sau; van Zeijl, Henk; Gielen, A. W. J.; Guoqi, Zhang

    2011-01-01

    Recently, the high-brightness LEDs have begun to be designed for illumination application. The increased electrical currents used to drive LEDs lead to thermal issues. Thermal management for LED module is a key design parameter as high operation temperature directly affects their maximum light output, quality, reliability and life time. In this review, only passive thermal solutions used on LED module will be studied. Moreover, new thermal interface materials and passive thermal solutions applied on electronic equipments are discussed which have high potential to enhance the thermal performance of LED Module.

  20. Patient-centered medical homes for patients with disabilities.

    PubMed

    Hernandez, Brigida; Damiani, Marco; Wang, T Arthur; Driscoll, Carolyn; Dellabella, Peter; LePera, Nicole; Mentari, Michael

    2015-01-01

    The patient-centered medical home is an innovative approach to improve health care outcomes. To address the unique needs of patients with intellectual and developmental disabilities (IDDs), a large health care provider reevaluated the National Committee for Quality Assurance's 6 medical home standards: (a) enhance access and continuity, (b) identify and manage patient populations, (c) plan and manage care, (d) provide self-care and community support, (e) track and coordinate care, and (f) measure and improve performance. This article describes issues to consider when serving patients with IDDs.

  1. Management of health care expenditure by soft computing methodology

    NASA Astrophysics Data System (ADS)

    Maksimović, Goran; Jović, Srđan; Jovanović, Radomir; Aničić, Obrad

    2017-01-01

    In this study was managed the health care expenditure by soft computing methodology. The main goal was to predict the gross domestic product (GDP) according to several factors of health care expenditure. Soft computing methodologies were applied since GDP prediction is very complex task. The performances of the proposed predictors were confirmed with the simulation results. According to the results, support vector regression (SVR) has better prediction accuracy compared to other soft computing methodologies. The soft computing methods benefit from the soft computing capabilities of global optimization in order to avoid local minimum issues.

  2. Man-machine interface analysis of the flight design system

    NASA Technical Reports Server (NTRS)

    Ramsey, H. R.; Atwood, M. E.; Willoughby, J. K.

    1978-01-01

    The objective of the current effort was to perform a broad analysis of the human factors issues involved in the design of the Flight Design System (FDS). The analysis was intended to include characteristics of the system itself, such as: (1) basic structure and functional capabilities of FDS; (2) user backgrounds, capabilities, and possible modes of use; (3) FDS interactive dialogue, problem solving aids; (4) system data management capabilities; and to include, as well, such system related matters as: (1) flight design team structure; (2) roles of technicians; (3) user training; and (4) methods of evaluating system performance. Wherever possible, specific recommendations are made. In other cases, the issues which seem most important are identified. In some cases, additional analyses or experiments which might provide resolution are suggested.

  3. Management of spontaneous pneumothorax compared to British Thoracic Society (BTS) 2003 guidelines: a district general hospital audit.

    PubMed

    Medford, Andrew Rl; Pepperell, Justin Ct

    2007-10-01

    In 1993, the British Thoracic Society (BTS) issued guidelines for the management of spontaneous pneumothorax (SP). These were refined in 2003. To determine adherence to the 2003 BTS SP guidelines in a district general hospital. An initial retrospective audit of 52 episodes of acute SP was performed. Subsequent intervention involved a junior doctor educational update on both the 2003 BTS guidelines and the initial audit results, and the setting up of an online guideline hyperlink. After the educational intervention a further prospective re-audit of 28 SP episodes was performed. Management of SP deviated considerably from the 2003 BTS guidelines in the initial audit - deviation rate 26.9%. After the intervention, a number of clinical management deviations persisted (32.1% deviation rate); these included failure to insert a chest drain despite unsuccessful aspiration, and attempting aspiration of symptomatic secondary SPs. Specific tools to improve standards might include a pneumothorax proforma to improve record keeping and a pneumothorax care pathway to reduce management deviations compared to BTS guidelines. Successful change also requires identification of the total target audience for any educational intervention.

  4. An Architecture for Cross-Cloud System Management

    NASA Astrophysics Data System (ADS)

    Dodda, Ravi Teja; Smith, Chris; van Moorsel, Aad

    The emergence of the cloud computing paradigm promises flexibility and adaptability through on-demand provisioning of compute resources. As the utilization of cloud resources extends beyond a single provider, for business as well as technical reasons, the issue of effectively managing such resources comes to the fore. Different providers expose different interfaces to their compute resources utilizing varied architectures and implementation technologies. This heterogeneity poses a significant system management problem, and can limit the extent to which the benefits of cross-cloud resource utilization can be realized. We address this problem through the definition of an architecture to facilitate the management of compute resources from different cloud providers in an homogenous manner. This preserves the flexibility and adaptability promised by the cloud computing paradigm, whilst enabling the benefits of cross-cloud resource utilization to be realized. The practical efficacy of the architecture is demonstrated through an implementation utilizing compute resources managed through different interfaces on the Amazon Elastic Compute Cloud (EC2) service. Additionally, we provide empirical results highlighting the performance differential of these different interfaces, and discuss the impact of this performance differential on efficiency and profitability.

  5. Tools to manage the enterprise-wide picture archiving and communications system environment.

    PubMed

    Lannum, L M; Gumpf, S; Piraino, D

    2001-06-01

    The presentation will focus on the implementation and utilization of a central picture archiving and communications system (PACS) network-monitoring tool that allows for enterprise-wide operations management and support of the image distribution network. The MagicWatch (Siemens, Iselin, NJ) PACS/radiology information system (RIS) monitoring station from Siemens has allowed our organization to create a service support structure that has given us proactive control of our environment and has allowed us to meet the service level performance expectations of the users. The Radiology Help Desk has used the MagicWatch PACS monitoring station as an applications support tool that has allowed the group to monitor network activity and individual systems performance at each node. Fast and timely recognition of the effects of single events within the PACS/RIS environment has allowed the group to proactively recognize possible performance issues and resolve problems. The PACS/operations group performs network management control, image storage management, and software distribution management from a single, central point in the enterprise. The MagicWatch station allows for the complete automation of software distribution, installation, and configuration process across all the nodes in the system. The tool has allowed for the standardization of the workstations and provides a central configuration control for the establishment and maintenance of the system standards. This report will describe the PACS management and operation prior to the implementation of the MagicWatch PACS monitoring station and will highlight the operational benefits of a centralized network and system-monitoring tool.

  6. Integrating policy-based management and SLA performance monitoring

    NASA Astrophysics Data System (ADS)

    Liu, Tzong-Jye; Lin, Chin-Yi; Chang, Shu-Hsin; Yen, Meng-Tzu

    2001-10-01

    Policy-based management system provides the configuration capability for the system administrators to focus on the requirements of customers. The service level agreement performance monitoring mechanism helps system administrators to verify the correctness of policies. However, it is difficult for a device to process the policies directly because the policies are the management concept. This paper proposes a mechanism to decompose a policy into rules that can be efficiently processed by a device. Thus, the device may process the rule and collect the performance statistics information efficiently; and the policy-based management system may collect these performance statistics information and report the service-level agreement performance monitoring information to the system administrator. The proposed policy-based management system achieves both the policy configuration and service-level agreement performance monitoring requirements. A policy consists of a condition part and an action part. The condition part is a Boolean expression of a source host IP group, a destination host IP group, etc. The action part is the parameters of services. We say that an address group is compact if it only consists of a range of IP address that can be denoted by a pair of IP address and corresponding IP mask. If the condition part of a policy only consists of the compact address group, we say that the policy is a rule. Since a device can efficiently process a compact address and a system administrator prefers to define a range of IP address, the policy-based management system has to translate policy into rules and supplements the gaps between policy and rules. The proposed policy-based management system builds the relationships between VPN and policies, policy and rules. Since the system administrator wants to monitor the system performance information of VPNs and policies, the proposed policy-based management system downloads the relationships among VPNs, policies and rules to the SNMP agents. The SNMP agents build the management information base (MIB) of all VPNs, policies and rules according to the relationships obtained from the management server. Thus, the proposed policy-based management system may get all performance monitoring information of VPNs and policies from agents. The proposed policy-based manager achieves two goals: a) provide a management environment for the system administrator to configure their network only considering the policy requirement issues and b) let the device have only to process the packet and then collect the required performance information. These two things make the proposed management system satisfy both the user and device requirements.

  7. Modeling and Simulation of HVAC Faulty Operations and Performance Degradation due to Maintenance Issues

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Liping; Hong, Tianzhen

    Almost half of the total energy used in the U.S. buildings is consumed by heating, ventilation and air conditionings (HVAC) according to EIA statistics. Among various driving factors to energy performance of building, operations and maintenance play a significant role. Many researches have been done to look at design efficiencies and operational controls for improving energy performance of buildings, but very few study the impacts of HVAC systems maintenance. Different practices of HVAC system maintenance can result in substantial differences in building energy use. If a piece of HVAC equipment is not well maintained, its performance will degrade. If sensorsmore » used for control purpose are not calibrated, not only building energy usage could be dramatically increased, but also mechanical systems may not be able to satisfy indoor thermal comfort. Properly maintained HVAC systems can operate efficiently, improve occupant comfort, and prolong equipment service life. In the paper, maintenance practices for HVAC systems are presented based on literature reviews and discussions with HVAC engineers, building operators, facility managers, and commissioning agents. We categorize the maintenance practices into three levels depending on the maintenance effort and coverage: 1) proactive, performance-monitored maintenance; 2) preventive, scheduled maintenance; and 3) reactive, unplanned or no maintenance. A sampled list of maintenance issues, including cooling tower fouling, boiler/chiller fouling, refrigerant over or under charge, temperature sensor offset, outdoor air damper leakage, outdoor air screen blockage, outdoor air damper stuck at fully open position, and dirty filters are investigated in this study using field survey data and detailed simulation models. The energy impacts of both individual maintenance issue and combined scenarios for an office building with central VAV systems and central plant were evaluated by EnergyPlus simulations using three approaches: 1) direct modeling with EnergyPlus, 2) using the energy management system feature of EnergyPlus, and 3) modifying EnergyPlus source code. The results demonstrated the importance of maintenance for HVAC systems on energy performance of buildings. The research is intended to provide a guideline to help practitioners and building operators to gain the knowledge of maintaining HVAC systems in efficient operations, and prioritize HVAC maintenance work plan. The paper also discusses challenges of modeling building maintenance issues using energy simulation programs.« less

  8. Personality Assessment of Global Talent: Conceptual and Methodological Issues

    ERIC Educational Resources Information Center

    van de Vijver, Fons J. R.

    2008-01-01

    The recruitment of managers who will operate in a culturally heterogeneous context (as expatriate managers, managers in a global company, or managers of a multicultural workforce) is increasingly important in an age of globalization. This article describes conceptual and methodological issues in the assessment of such managers, notably in the…

  9. Approaches of Improving University Assets Management Efficiency

    ERIC Educational Resources Information Center

    Wang, Jingliang

    2015-01-01

    University assets management, as an important content of modern university management, is generally confronted with the issue of low efficiency. Currently, to address the problems exposed in university assets management and take appropriate modification measures is an urgent issue in front of Chinese university assets management sectors. In this…

  10. A design and critical technology issues for on-orbit resupply of superfluid helium

    NASA Technical Reports Server (NTRS)

    Hopkins, Richard A.; Mord, Allan J.

    1990-01-01

    The issues of and the solutions to the critical design and technology areas of the Superfluid Helium On-Orbit Transfer (SHOOT) experiment, presently under development at the NASA Goddard Spaceflight Center, are discussed. Special attention is given to the SHOOT design requirements for the 10,000-liter superfluid He resupply tanker system, the concept details of the system, and the resupply operations and their analysis. A block diagram of the SHOOT system is included along with fluid management schematic and configuration diagrams of the system and its subsystems. A summary of the dewar performance is also presented.

  11. Characterization and management of electrical noise in the new Australian military HF communication network

    NASA Astrophysics Data System (ADS)

    Vyden, Bruce

    2000-03-01

    The Australian Defense Force's (ADF's) High Frequency (HF) communication network is soon to be replaced by a modernized system. Characterization of electrical noise at the receiver sites proposed for the new system is crucial to its performance. Consequently receiver site noise will be measured under the HF Modernization implementation contract that was awarded to Boeing Australia Ltd. Unfortunately the utility of the noise measurements is constrained by the uncertainties of both the ionosphere and atmosphere. This paper discusses some of the issues related to the methodology for measuring the noise and exposes some unresolved issues.

  12. Integrating telemedicine and telehealth: putting it all together.

    PubMed

    Weinstein, Ronald S; Lopez, Ana Maria; Krupinski, Elizabeth A; Beinar, Sandra J; Holcomb, Michael; McNeely, Richard A; Latifi, Rifat; Barker, Gail

    2008-01-01

    Telemedicine and telehealth programs are inherently complex compared with their traditional on-site health care delivery counterparts. Relatively few organizations have developed sustainable, multi-specialty telemedicine programs, although single service programs, such as teleradiology and telepsychiatry programs, are common. A number of factors are barriers to the development of sustainable telemedicine and telehealth programs. First, starting programs is often challenging since relatively few organizations have, in house, a critical mass of individuals with the skill sets required to organize and manage a telemedicine program. Therefore, it is necessary to "boot strap" many of the start-up activities using available personnel. Another challenge is to assemble a management team that has time to champion telemedicine and telehealth while dealing with the broad range of issues that often confront telemedicine programs. Telemedicine programs housed within a single health care delivery system have advantages over programs that serve as umbrella telehealth organizations for multiple health care systems. Planning a telemedicine program can involve developing a shared vision among the participants, including the parent organizations, management, customers and the public. Developing shared visions can be a time-consuming, iterative process. Part of planning includes having the partnering organizations and their management teams reach a consensus on the initial program goals, priorities, strategies, and implementation plans. Staffing requirements of telemedicine and telehealth programs may be met by sharing existent resources, hiring additional personnel, or outsourcing activities. Business models, such as the Application Service Provider (ASP) model used by the Arizona Telemedicine Program, are designed to provide staffing flexibility by offering a combination of in-house and out-sourced services, depending on the needs of the individual participating health care organizations. Telemedicine programs should perform ongoing assessments of activities, ranging from service usage to quality of service assessments, to ongoing analyses of financial performance. The financial assessments should include evaluations of costs and benefits, coding issues, reimbursement, account receivables, bad debt and network utilization. Long-range strategic planning for a telemedicine and telehealth program should be carried out on an on-going basis and should include the program's governing board. This planning process should include goal setting and the periodic updating of the program's vision and mission statements. There can be additional special issues for multi-organization telemedicine and telehealth programs. For example, authority management can require the use of innovative approaches tailored to the realities of the organizational structures of the participating members. Inter-institutional relations may introduce additional issues when competing health care organizations are utilizing shared resources. Branding issues are preferably addressed during the initial planning of a multi-organizational telemedicine and telehealth program. Ideally, public policy regarding telemedicine and telehealth within a service region will complement the objectives of telemedicine and telehealth programs within that service area.

  13. Through the Eyes of Higher Education Attorneys: How Department Chairs Are Navigating the Waters of Legal Issues and Risk Management

    ERIC Educational Resources Information Center

    Hustoles, Carol L. J.

    2012-01-01

    Legal and risk management issues substantially impact the operations of colleges and universities, which face escalating compliance requirements in an increasingly litigious environment. Failing to assess legal liability issues and to constructively address them with risk management processes create vulnerability to claims and litigation,…

  14. A survey on parasite management by equine veterinarians highlights the need for a regulation change

    PubMed Central

    Sallé, Guillaume; Cabaret, Jacques

    2015-01-01

    Introduction In-depth knowledge of the use of anthelminthics in the field, especially by veterinarians, is required to design more sustainable parasite control strategies. Materials and methods An online survey was sent by e-mail to 940 equine veterinary practitioners to describe their equine practice, their awareness about parasites and the management strategies they apply. Results Gastrointestinal parasites were generally considered (68%) as an issue of moderate importance. Drug efficacy failure was a minor or moderate issue for 47% and 48% of responders, respectively. Parasite management mostly relied on the use of systematic calendar treatments across a wide variety of horse owners (ie, riding schools, studs or hobby horse owners). Almost half of the practitioners (42%) never performed Faecal Egg Count (FEC) before drenching. Horse owners or their employees in charge of equines were reported to be the only person managing drenching in 59% of the collected answers. This was associated with the report of many off-label uses of anthelmintics and the frequent buying of drugs using the internet. Conclusions Given the critical situation regarding anthelmintic resistance, it seems necessary for veterinarians to reclaim parasite management and prevention as a specific topic. Implementation of stricter regulations for use of anthelmintics, like the one applied in Denmark, may make parasitic management in equids more sustainable. PMID:26421153

  15. Disease Management Evaluation: A Comprehensive Review of Current State of the Art.

    PubMed

    Conklin, Annalijn; Nolte, Ellen

    2011-01-01

    Many countries across Europe and elsewhere have been experimenting with various structured approaches to manage patients with chronic illness as a way to improve quality of care, reduce costs and lead to better population health outcomes in the long run. Despite a body of studies of disease management interventions, uncertainty about the effects of these remains not least because current guidance on evaluation methods and metrics require further development to enhance scientific rigour while also being practical in routine operations. This article provides details from a report that reviews the academic and grey literature to help advance the task of improving the science of assessing disease management initiatives in Europe. Challenges identified are methodological, analytical and conceptual in nature, with a key issue being the establishment of the counterfactual. An array of sophisticated statistical techniques and analytical frameworks can assist in the construction of a sound comparison strategy when a randomised controlled trial is not possible. Issues to consider include: a clear framework of the mechanisms of action and expected effects of disease management; an understanding of the characteristics of disease management (scope, content, dose, context), and of the intervention and target populations (disease type, severity, case-mix); a period of observation over multiple years; and a logical link between performance measures and the intervention's aims and underlying theory of behaviour change.

  16. Discourse coalitions in Swiss waste management: gridlock or winds of change?

    PubMed

    Duygan, Mert; Stauffacher, Michael; Meylan, Grégoire

    2018-02-01

    As a complex socio-technical system, waste management is crucially important for the sustainable management of material and energy flows. Transition to better performing waste management systems requires not only determining what needs to be changed but also finding out how this change can be realized. Without understanding the political context, insights from decision support tools such as life cycle assessment (LCA) are likely to be lost in translation to decision and policy making. This study strives to provide a first insight into the political context and address the opportunities and barriers pertinent to initiating a change in Swiss waste management. For this purpose, the discourses around a major policy process are analysed to uncover the policy beliefs and preferences of actors. Discourse coalitions are delineated by referring to the Advocacy Coalition Framework (Sabatier, 1998) and using the Discourse Network Analysis (Leifeld and Haunss, 2012) method. The results display an incoherent regime (Fuenfschilling and Truffer, 2014) with divergent belief clusters on core issues in waste management. Yet, some actors holding different beliefs appear to have overlapping interests on secondary issues such as the treatment of biogenic waste or plastics. Although the current political context hinders a system-wide disruptive change, transitions can be initiated at local or regional scale by utilizing the shared interest across different discourse coalitions. Copyright © 2017 Elsevier Ltd. All rights reserved.

  17. Special Report on the "Department of Energy's Efforts to Meet Accountability and Performance Reporting Objectives of the American Recovery and Reinvestment Act"

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The purpose of the American Recovery and Reinvestment Act of 2009 (Recovery Act) was to jumpstart the U.S. economy, create or save millions of jobs, spur technological advances in health and science, and invest in the Nation's energy future. The Department of Energy will receive an unprecedented $38 billion in Recovery Act funding to support a variety of science, energy, and environmental initiatives. The Recovery Act requires transparency and accountability over these funds. To this end, the Office of Management and Budget (OMB) issued guidance requiring the Department to compile and report a wide variety of funding, accounting, and performancemore » information. The Department plans to leverage existing information systems to develop accounting and performance information that will be used by program managers and ultimately reported to Recovery.gov, the government-wide source of Recovery Act information, and to OMB. The Department's iManage iPortal, a system that aggregates information from a number of corporate systems, will serve as the main reporting gateway for accounting information. In addition, the Department plans to implement a methodology or system that will permit it to monitor information reported directly to OMB by prime funding recipients. Furthermore, performance measures or metrics that outline expected outcomes are being developed, with results ultimately to be reported in a recently developed Department-wide system. Because of the significance of funds provided and their importance to strengthening the Nation's economy, we initiated this review to determine whether the Department had taken the steps necessary to ensure that Recovery Act funds can be appropriately tracked and are transparent to the public, and whether the benefits of the expenditures can be properly measured and reported clearly, accurately, and in a timely manner. Although not yet fully mature, we found that the Department's efforts to develop, refine, and apply the control structure needed to ensure accurate, timely, and reliable reporting to be both proactive and positive. We did, however, identify certain issues relating to Recovery Act performance management, accounting and reporting accuracy, and timeliness that should be addressed and resolved. In particular, at the time of our review: (1) Program officials had not yet determined whether existing information systems will be able to process anticipated transaction increases associated with the Recovery Act; (2) System modifications made to the Department's performance management system to accommodate Recovery Act performance measures had not yet been fully tested and verified; (3) The ability of prime and sub-recipients to properly segregate and report both accounting and performance information had not been determined; (4) There was a lack of coordination between Headquarters organizations related to aspects of Recovery Act reporting. For example, we observed that the Offices of Fossil Energy and Program, Analysis and Evaluation were both involved in developing job creation estimates that could yield significantly different results; and, (5) A significant portion (91 of 142, or 64 percent) of the performance measures developed for the Recovery Act activities were not quantifiable. In some instances, Project Operating Plans had not been finalized and we were not able to verify that all needed performance measures had been developed. Furthermore, the Department had not developed specific metrics to measure federal and contractor jobs creation and retention, an essential Recovery Act objective. The Department had devoted a great deal of time and resources to identifying and mitigating Recovery Act-related risks. For example, the Department developed a risk assessment tool that is intended to assist programs in identifying risks that can prevent its Recovery Act projects from meeting their intended goals. We also found that program staff and management officials at multiple levels were actively engaged in designing Recovery Act-related control and accountability programs. These efforts ranged from updating existing information systems to developing matrices designed to ensure that all required reporting and performance elements were addressed. Each of these activities required substantial effort and was accomplished within a relatively short period. Further, we noted that the Office of the Chief Financial Officer had been instrumental in helping impacted program elements identify issues that could adversely affect the Department's ability to execute its accounting, reporting, and performance monitoring responsibilities. While much has been done, additional work is necessary if the Department is to successfully manage Recovery Act-related risks. For example, as previously noted, OMB has issued guidance establishing Recovery Act monitoring and reporting requirements.« less

  18. Hospital financial management: what is the link between revenue cycle management, profitability, and not-for-profit hospitals' ability to grow equity?

    PubMed

    Singh, Simone Rauscher; Wheeler, John

    2012-01-01

    Effective revenue cycle management--from appointment scheduling and patient registration at the front end of the revenue cycle to billing and cash collections at the back end--plays a crucial role in hospitals' efforts to improve their financial performance. Using data for 1,397 bond-issuing, not-for-profit US hospitals for 2000 to 2007, this study analyzed the relationship between hospitals' performance at managing the revenue cycle and their profitability and ability to build equity capital. Hospital-level fixed effects regression analysis was used to model four different measures of profitability and equity capital as functions of two key financial indicators of revenue cycle management--amount of patient revenue and speed of revenue collection. The results indicated that higher amounts of patient revenue in relation to a hospital's assets were associated with statistically significant increases in operating and total profit margins, free cash flow, and equity capital (p < 0.01 for all four models); that is, hospitals that generated more patient revenue per dollar of assets invested reported improved financial performance. Likewise, a statistically significant link existed between lower revenue collection periods and all four indicators of hospital financial performance (p < 0.01 for three models; p < 0.05 for one model). Hospitals that collected faster on their patient revenue reported higher profit margins and larger equity values. For revenue cycle managers, these findings represent good news: Streamlining a hospital's management of the patient revenue cycle can advance the organization's financial viability by improving profitability and enabling equity growth.

  19. 76 FR 53414 - Pacific Fishery Management Council; Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-26

    ... Trailing Actions 7. Consider Inseason Adjustments--Part I 8. Emerging Issues Under Trawl Rationalization... Run Chinook Management Issues 2. 2011 Methodology Review I. Pacific Halibut Management 1. 2012 Pacific...

  20. Benchmark dynamics in the environmental performance of ports.

    PubMed

    Puig, Martí; Michail, Antonis; Wooldridge, Chris; Darbra, Rosa Mari

    2017-08-15

    This paper analyses the 2016 environmental benchmark performance of the port sector, based on a wide representation of EcoPorts members. This is the fifth time that this study has been conducted as an initiative of the European Sea Ports Organisation (ESPO). The data and results are derived from the Self-Diagnosis Method (SDM), a concise checklist against which port managers can self-assess the environmental management of their port in relation to the performance of the EcoPorts membership. The SDM tool was developed in the framework of the ECOPORTS project (2002-2005) and it is managed by ESPO. A total number of 91 ports from 20 different European Maritime States contributed to this evaluation. The main results are that air quality remains as the top environmental priority of the respondent ports, followed by energy consumption and noise. In terms of environmental management, the study confirms that key components are commonly implemented in the majority of European ports. 94% of contributing ports have a designated environmental manager, 92% own an environmental policy and 82% implement an environmental monitoring program. Waste is identified as the most monitored issue in ports (80%), followed by energy consumption (73%) and water quality (70%). Copyright © 2017 Elsevier Ltd. All rights reserved.

  1. Financial and risk considerations for successful disease management programs.

    PubMed

    Baldwin, A L

    1999-11-01

    Results for disease management [DM] programs have not been as positive as hoped because of clinical issues, lack of access to capital, and administrative issues. The financial experience of DM programs can be quite volatile. Financial projections that are protocol-based, rather than experience-based, may understate the revenue required and the range of possible costs for a DM program by understating the impact of complicating conditions and comorbidities. Actuarial tools (risk analysis and risk projection models) support better understanding of DM contracts. In particular, these models can provide the ability to quantify the impact of the factors that drive costs of a contract and the volatility of those costs. This analysis can assist DM companies in setting appropriate revenue and capital targets. Similar analysis by health plans can identify diseases that are good candidates for DM programs and can provide the basis for performance targets.

  2. 77 FR 40817 - Low-Level Radioactive Waste Regulatory Management Issues

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-11

    ...-2011-0012] RIN-3150-AI92 Low-Level Radioactive Waste Regulatory Management Issues AGENCY: Nuclear... Materials and Environmental Management Programs, U.S. Nuclear Regulatory Commission, Washington, DC 20555... State Materials and Environmental Management Programs, U.S. Nuclear Regulatory Commission, Washington...

  3. Telemental Health for Children and Adolescents: An Overview of Legal, Regulatory, and Risk Management Issues.

    PubMed

    Kramer, Gregory M; Luxton, David D

    2016-04-01

    The use of technology to provide telemental healthcare continues to increase; however, little has been written about the legal and regulatory issues involved in providing this form of care to children and adolescents. This article reviews existing laws and regulations to summarize the risk management issues relevant to providing telemental healthcare to children and adolescents. There are several legal and regulatory areas in which telemental health clinicians need to have awareness. These areas include: 1) Licensure, 2) malpractice liability, 3) credentialing and privileging, 4) informed consent, 5) security and privacy, and 6) emergency management. Although legal and regulatory challenges remain in providing telemental healthcare to children and adolescents, it is possible to overcome these challenges with knowledge of the issues and appropriate risk management strategies. We provide general knowledge of these key legal and regulatory issues, along with some risk management recommendations.

  4. Drinking Water Management and Governance in Canada: An Innovative Plan-Do-Check-Act (PDCA) Framework for a Safe Drinking Water Supply

    NASA Astrophysics Data System (ADS)

    Bereskie, Ty; Rodriguez, Manuel J.; Sadiq, Rehan

    2017-08-01

    Drinking water management in Canada is complex, with a decentralized, three-tiered governance structure responsible for safe drinking water throughout the country. The current approach has been described as fragmented, leading to governance gaps, duplication of efforts, and an absence of accountability and enforcement. Although there have been no major waterborne disease outbreaks in Canada since 2001, a lack of performance improvement, especially in small drinking water systems, is evident. The World Health Organization water safety plan approach for drinking water management represents an alternative preventative management framework to the current conventional, reactive drinking water management strategies. This approach has seen successful implementation throughout the world and has the potential to address many of the issues with drinking water management in Canada. This paper presents a review and strengths-weaknesses-opportunities-threats analysis of drinking water management and governance in Canada at the federal, provincial/territorial, and municipal levels. Based on this analysis, a modified water safety plan (defined as the plan-do-check-act (PDCA)-WSP framework) is proposed, established from water safety plan recommendations and the principles of PDCA for continuous performance improvement. This proposed framework is designed to strengthen current drinking water management in Canada and is designed to fit within and incorporate the existing governance structure.

  5. Drinking Water Management and Governance in Canada: An Innovative Plan-Do-Check-Act (PDCA) Framework for a Safe Drinking Water Supply.

    PubMed

    Bereskie, Ty; Rodriguez, Manuel J; Sadiq, Rehan

    2017-08-01

    Drinking water management in Canada is complex, with a decentralized, three-tiered governance structure responsible for safe drinking water throughout the country. The current approach has been described as fragmented, leading to governance gaps, duplication of efforts, and an absence of accountability and enforcement. Although there have been no major waterborne disease outbreaks in Canada since 2001, a lack of performance improvement, especially in small drinking water systems, is evident. The World Health Organization water safety plan approach for drinking water management represents an alternative preventative management framework to the current conventional, reactive drinking water management strategies. This approach has seen successful implementation throughout the world and has the potential to address many of the issues with drinking water management in Canada. This paper presents a review and strengths-weaknesses-opportunities-threats analysis of drinking water management and governance in Canada at the federal, provincial/territorial, and municipal levels. Based on this analysis, a modified water safety plan (defined as the plan-do-check-act (PDCA)-WSP framework) is proposed, established from water safety plan recommendations and the principles of PDCA for continuous performance improvement. This proposed framework is designed to strengthen current drinking water management in Canada and is designed to fit within and incorporate the existing governance structure.

  6. Early experiences in developing and managing the neuroscience gateway.

    PubMed

    Sivagnanam, Subhashini; Majumdar, Amit; Yoshimoto, Kenneth; Astakhov, Vadim; Bandrowski, Anita; Martone, MaryAnn; Carnevale, Nicholas T

    2015-02-01

    The last few decades have seen the emergence of computational neuroscience as a mature field where researchers are interested in modeling complex and large neuronal systems and require access to high performance computing machines and associated cyber infrastructure to manage computational workflow and data. The neuronal simulation tools, used in this research field, are also implemented for parallel computers and suitable for high performance computing machines. But using these tools on complex high performance computing machines remains a challenge because of issues with acquiring computer time on these machines located at national supercomputer centers, dealing with complex user interface of these machines, dealing with data management and retrieval. The Neuroscience Gateway is being developed to alleviate and/or hide these barriers to entry for computational neuroscientists. It hides or eliminates, from the point of view of the users, all the administrative and technical barriers and makes parallel neuronal simulation tools easily available and accessible on complex high performance computing machines. It handles the running of jobs and data management and retrieval. This paper shares the early experiences in bringing up this gateway and describes the software architecture it is based on, how it is implemented, and how users can use this for computational neuroscience research using high performance computing at the back end. We also look at parallel scaling of some publicly available neuronal models and analyze the recent usage data of the neuroscience gateway.

  7. Early experiences in developing and managing the neuroscience gateway

    PubMed Central

    Sivagnanam, Subhashini; Majumdar, Amit; Yoshimoto, Kenneth; Astakhov, Vadim; Bandrowski, Anita; Martone, MaryAnn; Carnevale, Nicholas. T.

    2015-01-01

    SUMMARY The last few decades have seen the emergence of computational neuroscience as a mature field where researchers are interested in modeling complex and large neuronal systems and require access to high performance computing machines and associated cyber infrastructure to manage computational workflow and data. The neuronal simulation tools, used in this research field, are also implemented for parallel computers and suitable for high performance computing machines. But using these tools on complex high performance computing machines remains a challenge because of issues with acquiring computer time on these machines located at national supercomputer centers, dealing with complex user interface of these machines, dealing with data management and retrieval. The Neuroscience Gateway is being developed to alleviate and/or hide these barriers to entry for computational neuroscientists. It hides or eliminates, from the point of view of the users, all the administrative and technical barriers and makes parallel neuronal simulation tools easily available and accessible on complex high performance computing machines. It handles the running of jobs and data management and retrieval. This paper shares the early experiences in bringing up this gateway and describes the software architecture it is based on, how it is implemented, and how users can use this for computational neuroscience research using high performance computing at the back end. We also look at parallel scaling of some publicly available neuronal models and analyze the recent usage data of the neuroscience gateway. PMID:26523124

  8. Process Management inside ATLAS DAQ

    NASA Astrophysics Data System (ADS)

    Alexandrov, I.; Amorim, A.; Badescu, E.; Burckhart-Chromek, D.; Caprini, M.; Dobson, M.; Duval, P. Y.; Hart, R.; Jones, R.; Kazarov, A.; Kolos, S.; Kotov, V.; Liko, D.; Lucio, L.; Mapelli, L.; Mineev, M.; Moneta, L.; Nassiakou, M.; Pedro, L.; Ribeiro, A.; Roumiantsev, V.; Ryabov, Y.; Schweiger, D.; Soloviev, I.; Wolters, H.

    2002-10-01

    The Process Management component of the online software of the future ATLAS experiment data acquisition system is presented. The purpose of the Process Manager is to perform basic job control of the software components of the data acquisition system. It is capable of starting, stopping and monitoring the status of those components on the data acquisition processors independent of the underlying operating system. Its architecture is designed on the basis of a server client model using CORBA based communication. The server part relies on C++ software agent objects acting as an interface between the local operating system and client applications. Some of the major design challenges of the software agents were to achieve the maximum degree of autonomy possible, to create processes aware of dynamic conditions in their environment and with the ability to determine corresponding actions. Issues such as the performance of the agents in terms of time needed for process creation and destruction, the scalability of the system taking into consideration the final ATLAS configuration and minimizing the use of hardware resources were also of critical importance. Besides the details given on the architecture and the implementation, we also present scalability and performance tests results of the Process Manager system.

  9. Performance analysis of data intensive cloud systems based on data management and replication: a survey

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Malik, Saif Ur Rehman; Khan, Samee U.; Ewen, Sam J.

    2015-03-14

    As we delve deeper into the ‘Digital Age’, we witness an explosive growth in the volume, velocity, and variety of the data available on the Internet. For example, in 2012 about 2.5 quintillion bytes of data was created on a daily basis that originated from myriad of sources and applications including mobiledevices, sensors, individual archives, social networks, Internet of Things, enterprises, cameras, software logs, etc. Such ‘Data Explosions’ has led to one of the most challenging research issues of the current Information and Communication Technology era: how to optimally manage (e.g., store, replicated, filter, and the like) such large amountmore » of data and identify new ways to analyze large amounts of data for unlocking information. It is clear that such large data streams cannot be managed by setting up on-premises enterprise database systems as it leads to a large up-front cost in buying and administering the hardware and software systems. Therefore, next generation data management systems must be deployed on cloud. The cloud computing paradigm provides scalable and elastic resources, such as data and services accessible over the Internet Every Cloud Service Provider must assure that data is efficiently processed and distributed in a way that does not compromise end-users’ Quality of Service (QoS) in terms of data availability, data search delay, data analysis delay, and the like. In the aforementioned perspective, data replication is used in the cloud for improving the performance (e.g., read and write delay) of applications that access data. Through replication a data intensive application or system can achieve high availability, better fault tolerance, and data recovery. In this paper, we survey data management and replication approaches (from 2007 to 2011) that are developed by both industrial and research communities. The focus of the survey is to discuss and characterize the existing approaches of data replication and management that tackle the resource usage and QoS provisioning with different levels of efficiencies. Moreover, the breakdown of both influential expressions (data replication and management) to provide different QoS attributes is deliberated. Furthermore, the performance advantages and disadvantages of data replication and management approaches in the cloud computing environments are analyzed. Open issues and future challenges related to data consistency, scalability, load balancing, processing and placement are also reported.« less

  10. Nontechnical issues in waste management: ethical, institutional, and political concerns

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hebert, J.A.; Rankin, W.L.; Brown, P.G.

    1978-05-01

    The report consists of a presentation and distillation of major nontechnical issues surrounding commercial waste management, followed by ethical, institutional, and political analyses of these issues. The ethical analysis consists of a discusson of what is meant by ''ethics'' and ''morality'' in the waste management context and an illustrative attempt at an ethical analysis of the commercial nuclear waste problem. Two institutional analyses are presented: one is an analysis of the possible problems of long-term human institutions in waste management; the other is a presentation of institutional arrangements for the short term. A final chapter discusses issues and concerns involvingmore » intergovernmental relations--that is, local, state, and federal interface problems in waste management.« less

  11. Does the Department of Defense Possess Solutions for the Department of Homeland Security’s Personnel Management Issues?

    DTIC Science & Technology

    2015-12-01

    DEPARTMENT OF DEFENSE POSSESS SOLUTIONS FOR THE DEPARTMENT OF HOMELAND SECURITY’S PERSONNEL MANAGEMENT ISSUES? by Joshua D. Frizzell December 2015...22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. 1. AGENCY USE ONLY (Leave blank...SOLUTIONS FOR THE DEPARTMENT OF HOMELAND SECURITY’S PERSONNEL MANAGEMENT ISSUES? 5. FUNDING NUMBERS 6. AUTHOR(S) Joshua D. Frizzell 7

  12. Species management benchmarking: outcomes over outputs in a changing operating environment.

    PubMed

    Hogg, Carolyn J; Hibbard, Chris; Ford, Claire; Embury, Amanda

    2013-03-01

    Species management has been utilized by the zoo and aquarium industry, since the mid-1990s, to ensure the ongoing genetic and demographic viability of populations, which can be difficult to maintain in the ever-changing operating environments of zoos. In 2009, the Zoo and Aquarium Association Australasia reviewed their species management services, focusing on addressing issues that had arisen as a result of the managed programs maturing and operating environments evolving. In summary, the project examined resourcing, policies, processes, and species to be managed. As a result, a benchmarking tool was developed (Health Check Report, HCR), which evaluated the programs against a set of broad criteria. A comparison of managed programs (n = 98), between 2008 and 2011, was undertaken to ascertain the tool's effectiveness. There was a marked decrease in programs that were designated as weak (37 down to 13); and an increase in excellent programs (24 up to 49) between the 2 years. Further, there were significant improvements in the administration benchmarking area (submission of reports, captive management plan development) across a number of taxon advisory groups. This HCR comparison showed that a benchmarking tool enables a program's performance to be quickly assessed and any remedial measures applied. The increases observed in program health were mainly due to increased management goals being attained. The HCR will be an ongoing program, as the management of the programs increases and goals are achieved, criteria will be refined to better highlight ongoing issues and ways in which these can be resolved. © 2012 Wiley Periodicals, Inc.

  13. Does Green Investment Increase Financial Performance? Empirical Evidence from Indonesian Companies

    NASA Astrophysics Data System (ADS)

    Chariri, Anis; Bukit, Gretta Ratna Sari Br; Eklesia, Octrine Bethary; Christi, Bourinta Uly; Tarigan, Daisy Meirisa

    2018-02-01

    The negative effects of globalization and rapid growth of industries on environment have changed the business paradigm from profit issues to profit, people and planet (triple bottom line). Consequently, a number of companies have invested their money in environmental issues (called as green investment). This study aims to investigate the effect of firm characteristics on green investment and how green investment influences financial performance. Using annual reports of companies receiving the Program for Pollution Control, Evaluation and Rating (PROPER) award and listed on the Indonesia Stock Exchanges in the year of 2009-2014 as research data, the findings showed that firm size, foreign ownership, industry profile, and frequency of audit committee meeting significantly influenced green investment whereas ISO14001 management certification had no effect on it. Interestingly, green investment positively determined an increase in firm financial performance. This reveals that the better the green investment, the higher the financial performance of the companies. The findings contribute to the importance of adopting green investment as a company's strategy to increase profit without destroying the environment. Secondly, this finding can be used by government as a reference for formulating any regulations concerning business and environment. Finally, the finding contributes to the importance of including environmental issues in business education.

  14. Challenges and strategies in applying performance measurement to federal public health programs.

    PubMed

    DeGroff, Amy; Schooley, Michael; Chapel, Thomas; Poister, Theodore H

    2010-11-01

    Performance measurement is widely accepted in public health as an important management tool supporting program improvement and accountability. However, several challenges impede developing and implementing performance measurement systems at the federal level, including the complexity of public health problems that reflect multiple determinants and involve outcomes that may take years to achieve, the decentralized and networked nature of public health program implementation, and the lack of reliable and consistent data sources and other issues related to measurement. All three of these challenges hinder the ability to attribute program results to specific public health program efforts. The purpose of this paper is to explore these issues in detail and offer potential solutions that support the development of robust and practical performance measures to meet the needs for program improvement and accountability. Adapting performance measurement to public health programs is both an evolving science and art. Through the strategies presented here, appropriate systems can be developed and monitored to support the production of meaningful data that will inform effective decision making at multiple levels. Published by Elsevier Ltd.

  15. Unobtrusive integration of data management with fMRI analysis.

    PubMed

    Poliakov, Andrew V; Hertzenberg, Xenia; Moore, Eider B; Corina, David P; Ojemann, George A; Brinkley, James F

    2007-01-01

    This note describes a software utility, called X-batch which addresses two pressing issues typically faced by functional magnetic resonance imaging (fMRI) neuroimaging laboratories (1) analysis automation and (2) data management. The first issue is addressed by providing a simple batch mode processing tool for the popular SPM software package (http://www.fil.ion. ucl.ac.uk/spm/; Welcome Department of Imaging Neuroscience, London, UK). The second is addressed by transparently recording metadata describing all aspects of the batch job (e.g., subject demographics, analysis parameters, locations and names of created files, date and time of analysis, and so on). These metadata are recorded as instances of an extended version of the Protégé-based Experiment Lab Book ontology created by the Dartmouth fMRI Data Center. The resulting instantiated ontology provides a detailed record of all fMRI analyses performed, and as such can be part of larger systems for neuroimaging data management, sharing, and visualization. The X-batch system is in use in our own fMRI research, and is available for download at http://X-batch.sourceforge.net/.

  16. [Decision-making process and administrative practice: managing the State Health Secretariat in Bahia, Brazil].

    PubMed

    Coelho, Thereza Christina Bahia; Paim, Jairnilson Silva

    2005-01-01

    This case study is based on research performed by the Bahia State Health Secretariat (SESAB), aimed at analyzing management practices during the implementation of a State government administrative reform. The institutional agenda shows evidence of limited participation by civil society and technical and operational staff in problem selection and prioritization, resulting from a work process pressured by high-level executive government staff. Decisions regarding "output" (projects, services, and activities) were made under the responsibility of subordinate operational levels and did not appear as issues in the institutional routine. Concerns related to "input" (financial and human resources) consumed most of the high-level efforts, with internal and external negotiations and compromises to assure access to them. Meanwhile the possible "outcome", namely public health status, represents the "occult subject" of the institutional discourse. Information emerges in institutional disputes as a technical "power resource" in its medical, epidemiological, health, and administrative dimensions. The issue of government "representation" and allied interests is based on ideological dispositions and authoritarian practices, thus contradicting the need for management transparency and modernization.

  17. [Effective delegation].

    PubMed

    Fang, Li; Hung, Chich-Hsiu

    2008-12-01

    Ninety-seven percent of middle level managers feel they face work overload. The source of this problem may lie in a failure to delegate tasks effectively. If a manager does not effectively delegate, he/she is more likely to report fatigue, stress and depression. Conversely, effectively delegating tasks will improve overall job quality, professional growth in subordinates and cooperation within the team. While it is necessary for managers to delegate tasks effectively, few can be considered to be good natural 'delegators'. Learning and training is necessary for managers to develop the necessary confidence and maturity. This article describes the definitions, purpose and benefits of delegation; factors related to effective delegation; strategies related to successful delegation and skills related to performing cross-cultural delegations. Such issues have seldom been addressed in previous articles. Moreover, nursing implications and suggested applications in nursing practice, education, management and research are mentioned. This article is intended to provide directions to nursing managers and subordinates to promote delegation knowledge and skills.

  18. Public health financial management competencies.

    PubMed

    Honoré, Peggy A; Costich, Julia F

    2009-01-01

    The absence of appropriate financial management competencies has impeded progress in advancing the field of public health finance. It also inhibits the ability to professionalize this sector of the workforce. Financial managers should play a critical role by providing information relevant to decision making. The lack of fundamental financial management knowledge and skills is a barrier to fulfilling this role. A national expert committee was convened to examine this issue. The committee reviewed standards related to financial and business management practices within public health and closely related areas. Alignments were made with national standards such as those established for government chief financial officers. On the basis of this analysis, a comprehensive set of public health financial management competencies was identified and examined further by a review panel. At a minimum, the competencies can be used to define job descriptions, assess job performance, identify critical gaps in financial analysis, create career paths, and design educational programs.

  19. The middle manager role in energy company environmental efforts

    NASA Astrophysics Data System (ADS)

    Fischhoff, Maya E.

    2005-12-01

    This research examines the internal organizational processes determining corporate environmental action. Corporations have a tremendous environmental impact, yet relatively little is known about how employees within them view and work on these issues. The research focused on middle managers, a level of the company whose value is often questioned. Interviews were conducted with 70 middle managers at two energy companies (comprising utilities and unregulated businesses). Interviews examined the shape and significance of middle manager involvement in environmental issues, looking specifically at what issues middle managers deal with, what goals they pursue, and what approaches they use. The research finds middle managers' roles with respect to environmental issues to be far-reaching and complex. Much of their effort is focused on meeting regulatory requirements ("complying"). They are committed to compliance, in part for ethical reasons, but often find regulations frustrating and costly. Compliance is more challenging than commonly thought; it demands time, knowledge, and substantial creativity. In pursuing it, interviewees work with employees throughout the organization. This research shows middle managers interacting with those hierarchically above and below them in ways that greatly modify earlier portrayals of middle managers. Earlier portrayals often emphasized struggles for power within the organization. Here, middle managers work in ways best characterized as collaborative and supportive. Middle managers also have extensive involvement laterally within the company and with groups outside the company. These links have received modest attention in literature, yet are found to be terribly important. Middle managers' lateral efforts inside the company, often on teams, allow diverse expertise (e.g., from people in different functions) to be applied to environmental issues. Documenting middle managers' involvement externally, with governmental officials and sectors of the public, illuminates areas of very visible corporate impact. External interactions are also settings in which middle managers encounter alternative views about environmental issues. The study reveals the importance of middle managers in the challenge of environmental compliance. It provides knowledge that can be used by external entities seeking to connect with companies, and by companies seeking to address environmental issues better. It thus aids understanding of a critical societal challenge and opportunity.

  20. A framework of medical equipment management system for in-house clinical engineering department.

    PubMed

    Chien, Chia-Hung; Huang, Yi-You; Chong, Fok-Ching

    2010-01-01

    Medical equipment management is an important issue for safety and cost in modern hospital operation. In addition, the use of an efficient information system effectively promotes the managing performance. In this study, we designed a framework of medical equipment management system used for in-house clinical engineering department. The system was web-based, and it integrated clinical engineering and hospital information system components. Through related information application, it efficiently improved the operation management of medical devices immediately and continuously. This system has run in the National Taiwan University Hospital. The results showed only few examples in the error analysis of medical equipment by the maintenance sub-system. The information can be used to improve work quality, to reduce the maintenance cost, and to promote the safety of medical device used in patients and clinical staffs.

  1. Creating a comprehensive customer service program to help convey critical and acute results of radiology studies.

    PubMed

    Towbin, Alexander J; Hall, Seth; Moskovitz, Jay; Johnson, Neil D; Donnelly, Lane F

    2011-01-01

    Communication of acute or critical results between the radiology department and referring clinicians has been a deficiency of many radiology departments. The failure to perform or document these communications can lead to poor patient care, patient safety issues, medical-legal issues, and complaints from referring clinicians. To mitigate these factors, a communication and documentation tool was created and incorporated into our departmental customer service program. This article will describe the implementation of a comprehensive customer service program in a hospital-based radiology department. A comprehensive customer service program was created in the radiology department. Customer service representatives were hired to answer the telephone calls to the radiology reading rooms and to help convey radiology results. The radiologists, referring clinicians, and customer service representatives were then linked via a novel workflow management system. This workflow management system provided tools to help facilitate the communication needs of each group. The number of studies with results conveyed was recorded from the implementation of the workflow management system. Between the implementation of the workflow management system on August 1, 2005, and June 1, 2009, 116,844 radiology results were conveyed to the referring clinicians and documented in the system. This accounts for more than 14% of the 828,516 radiology cases performed in this time frame. We have been successful in creating a comprehensive customer service program to convey and document communication of radiology results. This program has been widely used by the ordering clinicians as well as radiologists since its inception.

  2. Mars transit vehicle thermal protection system: Issues, options, and trades

    NASA Technical Reports Server (NTRS)

    Brown, Norman

    1986-01-01

    A Mars mission is characterized by different mission phases. The thermal control of cryogenic propellant in a propulsive vehicle must withstand the different mission environments. Long term cryogenic storage may be achieved by passive or active systems. Passive cryo boiloff management features will include multilayer insulation, vapor cooled shield, and low conductance structural supports and penetrations. Active boiloff management incorporates the use of a refrigeration system. Key system trade areas include active verses passive system boiloff management (with respect to safety, reliability, and cost) and propellant tank insulation optimizations. Technology requirements include refrigeration technology advancements, insulation performance during long exposure, and cryogenic fluid transfer system for mission vehicle propellant tanking during vehicle buildip in LEO.

  3. [Information technologies: new partners in treating diabetes].

    PubMed

    Colombet, I; Chatellier, G

    2001-10-15

    The management of chronic diseases such as diabetes is becoming a crucial issue in developed countries. Innovative communication technologies should now be included as new partners in the health care system. These technologies can help both in managing patients and measuring quality of care. Internet-based health promotion programs may improve compliance with treatment. Decision systems are available on the Net to help patients monitoring their diet and insulin doses. The use of electronic medical record shared on Internet may help both physicians and patients to monitor on the long term the effect of interventions. It is now time to perform appropriate trials to determine, beside other interventions, the precise role of innovative communication technologies in diabetes management.

  4. Presentation and outcome of clinical poor performance in one health district over a 5-year period: 2002-2007.

    PubMed

    Cox, Stephen J; Holden, John D

    2009-05-01

    The detection, assessment, and management of primary care poor performance raise difficult issues for all those involved. Guidance has largely focused on managing the most serious cases where patient safety is severely compromised. The management of primary care poor performance has become an increasingly important part of primary care trust (PCT) work, but its modes of presentation and prevalence are not well known. To report the prevalence, presentation modes, and management of primary care poor performance cases presenting to one PCT over a 5-year period. A retrospective review of primary care poor performance cases in one district. St Helens PCT administered 35 practices with 130 GPs on the performers list, caring for 190 110 patients in North West England, UK. Cases presenting during 2002-2007 were initially reviewed by the chair of the PCT clinical executive committee. Anonymised data were then jointly reviewed by the assessor and another experienced GP advisor. There were 102 individual presentations (20 per year or one every 2-3 weeks) where clinician performance raised significant cause for concern occurred over the 5-year period. These concerns related to 37 individual clinicians, a range of 1-14 per clinician (mean 2.7). Whistleblowing by professional colleagues on 43 occasions was the most common presentation, of which 26 were from GPs about GPs. Patient complaints (18) were the second most common presentation. Twenty-seven clinicians were GPs, of whom the General Medical Council (GMC) were notified or involved in 13 cases. Clinicians were supported locally, and remedying was exclusively locally managed in 14 cases, and shared with an external organisation (such as the GMC or deanery) in another 12. Professional whistleblowing and patient complaints were the most common sources of presentation. Effective PCT teams are needed to manage clinicians whose performance gives cause for concern. Sufficient resources and both formal and informal ways of reporting concerns are essential.

  5. Bibliography of Lewis Research Center technical publications announced in 1982

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The technical reporting that resulted from the scientific and engineering work performed and managed by the Lewis Research Center in 1982 is described. All the publications were announced in the 1982 issues of STAR (Scientific and Technical Aerospace Reports) and/or IAA (International Aerospace Abstracts). Included are research reports, journal articles, conference presentations, patents and patent applications, and theses.

  6. Missing Link: Integrated Individual Leadership Development, Employee Engagement, and Customer Value-Added Improvement

    ERIC Educational Resources Information Center

    Heldenbrand, Lois; Simms, Michael S.

    2012-01-01

    Long-term care is a key public issue that affects all of us in some way at some time of our lives. Nowhere is performance improvement and quality management more imperative. Through an 8-month field study and follow-up case study, we discuss how using an integrated approach to individual leadership development, employee engagement, and customer…

  7. Effects of ruminally degradable N in diets containing wet corn distiller's grains and steam-flaked corn on feedlot cattle performance and carcass characteristics

    USDA-ARS?s Scientific Manuscript database

    Assessment of degradable nitrogen (N) needs in diets containing wet corn distiller's grains with solubles (WCDGS) is needed to aid the cattle feeding industry in managing feed costs and potential environmental issues. Yearling steers (n = 525; initial weight = 822 +/- 28 lb) were housed in 56 pens (...

  8. Update: The pathogenesis and treatment of PCOS.

    PubMed

    Hill, Kathryn M

    2003-07-01

    Irregular menstrual cycles, acne, and hirsutism often cause women to present to a primary care setting. This article demonstrates how to take a careful history, perform a physical examination, and order the laboratory tests necessary to diagnose polycystic ovary syndrome (PCOS). Managing PCOS complaints and maintaining important health issues are also addressed, as well as when to refer to a specialist.

  9. Tenure as a Fact of Academic Life: A Methodology for Managing the Performance of Tenured Professors

    ERIC Educational Resources Information Center

    Hawkins, Alfred G., Jr.; Graham, Richard D.; Hall, Richard F.

    2007-01-01

    Academic freedom is the right, especially of a university professor, to free speech without fear of reprisal. Experts posit three means to academic freedom: tenure, due process and professional competence. A critical issue in current post-secondary education governance and administration that relates to each of these means is post-tenure review.…

  10. 76 FR 56227 - Publication of the Office of Federal Procurement Policy (OFPP) Policy Letter 11-01, Performance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-12

    ... Management and Budget (OMB) is issuing a policy letter to provide to Executive Departments and agencies... section 321 of the Duncan Hunter National Defense Authorization Act (NDAA) for Fiscal Year 2009 (Pub. L...-Departments-and-Agencies-Subject-Government/ . Section 321 may be found at http://www.dod.gov/dodgc/olc/docs...

  11. Management of ethical issues related to care of seriously ill dialysis patients in free-standing facilities.

    PubMed

    Song, Mi-Kyung; Hanson, Laura C; Gilet, Constance A; Jo, Minjeong; Reed, Teresa J; Hladik, Gerald A

    2014-09-01

    There are few data on the frequency and current management of clinical ethical issues related to care of seriously ill dialysis patients in free-standing dialysis facilities. To examine the extent of clinical ethical challenges experienced by care providers in free-standing facilities and their perceptions about how those issues are managed. A total of 183 care providers recruited from 15 facilities in North Carolina completed a survey regarding the occurrence and management of ethical issues in the past year. Care plan meetings were observed at four of the facilities for three consecutive months. Also, current policies and procedures at each of the facilities were reviewed. The two most frequently experienced challenges involved dialyzing frail patients with multiple comorbidities and caring for disruptive/difficult patients. The most common ways of managing ethical issues were discussions in care plan meetings (n = 47) or discussions with the clinic manager (n = 47). Although policies were in place to guide management of some of the challenges, respondents were often not aware of those policies. Also, although participants reported that ethical issues related to dialyzing undocumented immigrants were fairly common, no facility had a policy for managing this challenge. Participants suggested that all staff obtain training in clinical ethics and communication skills, facilities develop ethics teams, and there be clear policies to guide management of ethical challenges. The scope of ethical challenges was extensive, how these challenges were managed varied widely, and there were limited resources for assistance. Multifaceted efforts, encompassing endeavors at the individual, facility, organization, and national levels, are needed to support staff in improving the management of ethical challenges in dialysis facilities. Copyright © 2014 American Academy of Hospice and Palliative Medicine. Published by Elsevier Inc. All rights reserved.

  12. Improving clinical handover in a paediatric ward: implications for nursing management.

    PubMed

    Mannix, Trudi; Parry, Yvonne; Roderick, Allison

    2017-04-01

    To describe how nursing staff in a paediatric ward improved the conduct of clinical handover, using a practise development approach. ISBAR (Identify, Situation, Background, Assessment and Recommendation) is a mnemonic tool to aid the safe transfer of patient information in clinical handover. The nurses identified the need to improve the use of ISBAR, and other issues related to handover that could compromise patient safety and constrain family-centred care. Sixty-one percent of nurses on the ward contributed to issue identification and the design of the educational material, including a set of written and video resources and incorporating the role of a handover coach. Staff performance was evaluated before and after access to the resources using self-administered Likert scales, observation and a focus group. After the intervention, there was a stronger relationship between the participants' understanding of ISBAR and their application of it in handover. Further, there were statistically significant increases in improved handover practises, including family inclusion and safety checks. A practise development approach is useful in the provision of education to guide clinical performance in patient handover. Nurse managers can use this approach to empower their staff to make positive changes to practise. © 2017 John Wiley & Sons Ltd.

  13. Elucidating Performance Limitations in Alkaline-Exchange- Membrane Fuel Cells

    DOE PAGES

    Shiau, Huai-Suen; Zenyuk, Iryna V.; Weber, Adam Z.

    2017-07-15

    Water management is a serious concern for alkaline-exchange-membrane fuel cells (AEMFCs) because water is a reactant in the alkaline oxygen-reduction reaction and hydroxide conduction in alkaline-exchange membranes is highly hydration dependent. Here in this article, we develop and use a multiphysics, multiphase model to explore water management in AEMFCs. We demonstrate that the low performance is mostly caused by extremely non-uniform distribution of water in the ionomer phase. A sensitivity analysis of design parameters including humidification strategies, membrane properties, and water transport resistance was undertaken to explore possible optimization strategies. Furthermore, the strategy and issues of reducing bicarbonate/carbonate buildup inmore » the membrane-electrode assembly with CO 2 from air is demonstrated based on the model prediction. Overall, mathematical modeling is used to explore trends and strategies to overcome performance bottlenecks and help enable AEMFC commercialization.« less

  14. From mission to measures: performance measure development for a Teen Pregnancy Prevention Program.

    PubMed

    Farb, Amy Feldman; Burrus, Barri; Wallace, Ina F; Wilson, Ellen K; Peele, John E

    2014-03-01

    The Office of Adolescent Health (OAH) sought to create a comprehensive set of performance measures to capture the performance of the Teen Pregnancy Prevention (TPP) program. This performance measurement system needed to provide measures that could be used internally (by both OAH and the TPP grantees) for management and program improvement as well as externally to communicate the program's progress to other interested stakeholders and Congress. This article describes the selected measures and outlines the considerations behind the TPP measurement development process. Issues faced, challenges encountered, and lessons learned have broad applicability for other federal agencies and, specifically, for TPP programs interested in assessing their own performance and progress. Published by Elsevier Inc.

  15. Implementing the community health worker model within diabetes management: challenges and lessons learned from programs across the United States.

    PubMed

    Cherrington, Andrea; Ayala, Guadalupe X; Amick, Halle; Allison, Jeroan; Corbie-Smith, Giselle; Scarinci, Isabel

    2008-01-01

    The purpose of this qualitative study was to examine methods of implementation of the community health worker (CHW) model within diabetes programs, as well as related challenges and lessons learned. Semi-structured interviews were conducted with program managers. Four databases (PubMed, CINAHL, ISI Web of Knowledge, PsycInfo), the CDC's 1998 directory of CHW programs, and Google Search Engine were used to identify CHW programs. Criteria for inclusion were: DM program; used CHW strategy; occurred in United States. Two independent reviewers performed content analyses to identify major themes and findings. Sixteen programs were assessed, all but 3 focused on minority populations. Most CHWs were recruited informally; 6 programs required CHWs to have diabetes. CHW roles and responsibilities varied across programs; educator was the most commonly identified role. Training also varied in terms of both content and intensity. All programs gave CHWs remuneration for their work. Common challenges included difficulties with CHW retention, intervention fidelity and issues related to sustainability. Cultural and gender issues also emerged. Examples of lessons learned included the need for community buy-in and the need to anticipate nondiabetes related issues. Lessons learned from these programs may be useful to others as they apply the CHW model to diabetes management within their own communities. Further research is needed to elucidate the specific features of this model necessary to positively impact health outcomes.

  16. Potential of connected devices to optimize cattle reproduction.

    PubMed

    Saint-Dizier, Marie; Chastant-Maillard, Sylvie

    2018-05-01

    Estrus and calving are two major events of reproduction that benefit from connected devices because of their crucial importance in herd economics and the amount of time required for their detection. The objectives of this review are to: 1) provide an update on performances reached by sensor systems to detect estrus and calving time; 2) discuss current economic issues related to connected devices for the management of cattle reproduction; 3) propose perspectives for these devices. The main physiological parameters monitored separately or in combination by connected devices are the cow activity, body temperature and rumination or eating behavior. The combination of several indicators in one sensor may maximize the performances of estrus and calving detection. An effort remains to be made for the prediction of calvings that will require human assistance (dystocia). The main reasons to invest in connected devices are to optimize herd reproductive performances and reduce labor on farm. The economic benefit was evaluated for estrus detection and depends on the initial herd performances, herd size, labor cost and price of the equipment. Major issues associated with the use of automated sensor systems are the weight of financial investment, the lack of economic analysis and limited skills of the users to manage associated technologies. In the near future, connected devices may allow a precise phenotyping of reproductive and health traits on animals and could help to improve animal welfare and public perception of animal production. Copyright © 2017 Elsevier Inc. All rights reserved.

  17. Structural marsh management research priorities

    USGS Publications Warehouse

    Cahoon, Donald R.; Groat, Charles G.

    1989-01-01

    The paper presents a prioritized list of research issues related to structural marsh management developed by a multidisciplinary panel of regulatory agency representatives, landowners, and scientists. More than 75 issues were identified concerning landscape changes, influence on ecological processes (i.e., hydrologic, biologic, and edaphic factors), habitat quality, cumulative impacts, and management approach. These issues were prioritized and organized around six basic questions regulatory personnel must try to answer for each marsh management plan application. The six questions deal with the influence of marsh management on, in order of most immediate need, marsh loss and health, fisheries, wildlife, habitat change, water quality, and cumulative effects.

  18. Greening Federal Facilities: An Energy, Environmental, and Economic Resource Guide for Federal Facility Managers and Designers; Second Edition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, A.

    2001-05-16

    Greening Federal Facilities, Second Edition, is a nuts-and-bolts resource guide compiled to increase energy and resource efficiency, cut waste, and improve the performance of Federal buildings and facilities. The guide highlights practical actions that facility managers, design and construction staff, procurement officials, and facility planners can take to save energy and money, improve the comfort and productivity of employees, and benefit the environment. It supports a national effort to promote energy and environmental efficiency in the nation's 500,000 Federal buildings and facilities. Topics covered include current Federal regulations; environmental and energy decision-making; site and landscape issues; building design; energy systems;more » water and wastewater; materials; waste management, and recycling; indoor environmental quality; and managing buildings.« less

  19. Issues for small businesses with waste management.

    PubMed

    Redmond, Janice; Walker, Elizabeth; Wang, Calvin

    2008-07-01

    Participation by small and medium enterprise (SME) in corporate social responsibility issues has been found to be lacking. This is a critical issue, as individually SMEs may have little impact on the environment but their collective footprint is significant. The management style and ethical stance of the owner-manager affects business decision making and therefore has a direct impact on the environmental actions of the business. Although adoption of environmental practices to create competitive advantage has been advocated, many businesses see implementation as a cost which cannot be transferred to their customers. After a brief review of pertinent literature this paper reports on an exploratory investigation into the issue. Results show that whereas owner-managers of small enterprises express concern regarding the environment, this does not then translate into better waste management practices.

  20. 41 CFR 109-27.5104-5 - Control and issue of stock.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Control and issue of stock. 109-27.5104-5 Section 109-27.5104-5 Public Contracts and Property Management Federal Property Management Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS SUPPLY AND...

  1. 17 CFR 274.13 - Form N-8B-3, registration statement of unincorporated management investment companies currently...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... statement of unincorporated management investment companies currently issuing periodic payment plan...-8B-3, registration statement of unincorporated management investment companies currently issuing..., pursuant to section 8(b) of the Investment Company Act of 1940, by unincorporated management investment...

  2. University Management Education and Research in Canada: Some Unresolved Issues.

    ERIC Educational Resources Information Center

    von Zur-Muehlen, Max

    An historical overview of university management education and research in Canada is presented and issues relevant to the present status of management education and research opportunities are discussed. Management and administrative studies schools in Canada receive, on the average, about four percent of the operating budget of the university…

  3. Disturbance, scale, and boundary in wilderness management

    Treesearch

    Peter S. White; Jonathan Harrod; Joan L. Walker; Anke Jentsch

    2000-01-01

    Natural disturbances are critical to wilderness management. This paper reviews recent research on natural disturbance and addresses the problem of managing for disturbances in a world of human-imposed scales and boundaries. The dominant scale issue in disturbance management is the question of patch dynamic equilibrium. The dominant boundary issue in disturbance...

  4. 41 CFR 101-39.208 - Vehicles removed from defined areas.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... VEHICLES 39-INTERAGENCY FLEET MANAGEMENT SYSTEMS 39.2-GSA Interagency Fleet Management System Services... operated outside the geographical area served by the issuing GSA IFMS fleet management center. However... shall notify the issuing GSA IFMS fleet management center of the following: (1) The location at which...

  5. Disturbance, Scale, and Boundary in Wilderness Management

    Treesearch

    Peter S. White; Jonathan Harrod; Joan L. Walker; Anke Jentsch

    2000-01-01

    Natural disturbances are critical to wilderness management. This paper reviews recent research on natural disturbance and addresses the problem of managing for disturbances in a world of human-imposed scales and boundaries. The dominant scale issue in disturbance management is the question of patch dynamic equilibrium. The dominant boundary issue in disturbance...

  6. Groundwater contamination from waste management sites: The interaction between risk-based engineering design and regulatory policy: 2. Results

    NASA Astrophysics Data System (ADS)

    Massmann, Joel; Freeze, R. Allan

    1987-02-01

    The risk-cost-benefit analysis developed in the companion paper (J. Massmann and R. A. Freeze, this issue) is here applied to (1) an assessment of the relative worth of containment-construction activities, site-exploration activities, and monitoring activities as components of a design strategy for the owner/operator of a waste management facility; (2) an assessment of alternative policy options available to a regulatory agency; and (3) a case history. Sensitivity analyses designed to address the first issue show that the allocation of resources by the owner/operator is sensitive to the stochastic parameters used to describe the hydraulic conductivity field at a site. For the cases analyzed, the installation of a dense monitoring network is of less value to the owner/operator than a more conservative containment design. Sensitivity analyses designed to address the second issue suggest that from a regulatory perspective, design standards should be more effective than performance standards in reducing risk, and design specifications on the containment structure should be more effective than those on the monitoring network. Performance bonds posted before construction have a greater potential to influence design than prospective penalties to be imposed at the time of failure. Siting on low-conductivity deposits is a more effective method of risk reduction than any form of regulatory influence. Results of the case history indicate that the methodology can be successfully applied at field sites.

  7. Incompatible blood transfusion: Challenging yet lifesaving in the management of acute severe autoimmune hemolytic anemia.

    PubMed

    Das, Sudipta Sekhar; Zaman, Rafiq Uz; Safi, Mohammad

    2014-07-01

    Autoimmune hemolytic anemia (AIHA) is characterized by the production of autoantibodies directed against red cell antigens. Most patients of AIHA arrive in the emergency or out-patient department (OPD) with severe anemia requiring urgent blood transfusion. Here we share our experience of managing these patients with incompatible blood transfusions and suggest the minimal test required to assure patient safety. A total of 14 patients admitted with severe anemia, diagnosed with AIHA and requiring blood transfusion urgently were included in the study. A series of immunohematological investigations were performed to confirm the diagnosis and issue best match packed red blood cells (PRBC) to these patients. A total of 167 PRBC units were crossmatched for 14 patients of which 46 units (28%) were found to be best match ones and 26 (56.5%) of these units were transfused. A mean turn around time of 222 min was observed in issuing the "best match" blood. Severe hemolysis was observed in all patients with a median hemoglobin increment of 0.88 g/dl after each unit PRBC transfusion. Decision to transfuse in AIHA should be based on the clinical condition of the patient. No critical patient should be denied blood transfusion due to serological incompatibility. Minimum investigations such as direct antiglobulin test (DAT), antibody screening and autocontrol should be performed to ensure transfusion safety in patients. All transfusion services should be capable of issuing "best match" PRBCs in AIHA.

  8. Incompatible blood transfusion: Challenging yet lifesaving in the management of acute severe autoimmune hemolytic anemia

    PubMed Central

    Das, Sudipta Sekhar; Zaman, Rafiq Uz; Safi, Mohammad

    2014-01-01

    Background and Aim: Autoimmune hemolytic anemia (AIHA) is characterized by the production of autoantibodies directed against red cell antigens. Most patients of AIHA arrive in the emergency or out-patient department (OPD) with severe anemia requiring urgent blood transfusion. Here we share our experience of managing these patients with incompatible blood transfusions and suggest the minimal test required to assure patient safety. Materials and Methods: A total of 14 patients admitted with severe anemia, diagnosed with AIHA and requiring blood transfusion urgently were included in the study. A series of immunohematological investigations were performed to confirm the diagnosis and issue best match packed red blood cells (PRBC) to these patients. Results: A total of 167 PRBC units were crossmatched for 14 patients of which 46 units (28%) were found to be best match ones and 26 (56.5%) of these units were transfused. A mean turn around time of 222 min was observed in issuing the “best match” blood. Severe hemolysis was observed in all patients with a median hemoglobin increment of 0.88 g/dl after each unit PRBC transfusion. Conclusion: Decision to transfuse in AIHA should be based on the clinical condition of the patient. No critical patient should be denied blood transfusion due to serological incompatibility. Minimum investigations such as direct antiglobulin test (DAT), antibody screening and autocontrol should be performed to ensure transfusion safety in patients. All transfusion services should be capable of issuing “best match” PRBCs in AIHA. PMID:25161349

  9. Tracing a roadmap for vitamin B₁₂ testing using the health technology assessment approach.

    PubMed

    Ferraro, Simona; Mozzi, Roberta; Panteghini, Mauro

    2014-06-01

    In our hospital, we are currently working to manage the appropriateness of vitamin B₁₂ (B12) testing. Unfortunately, the classic evidence-based approach is unhelpful in this process and meta-analyzing data on the accuracy of this marker for cobalamin deficiency detection is misleading due to the lack of reference diagnostic methods. The approach currently proposed by the Health Technology Assessment (HTA) enables us to tackle the issue of B₁₂ requests as a "healthcare" problem by considering the position of stakeholders involved in ordering, performing, interpreting the test, and receiving its results. Clinical expectations, methodological issues, and ethical aspects concerning the performance of the test can aid us in providing more guidance on the use of this marker. By building such structured information, hemodialysis patients and pregnant women have emerged as those groups preferentially requiring B₁₂ testing, as it may potentially improve the clinical outcome. To avoid misinterpretation of B₁₂ results more care should be taken in considering its biochemical and biological features, as well as the analytical issues. Spurious values obtained by current automated immunoassays may reflect suboptimal pre-analytical steps as well as known interfering conditions. Furthermore, the harmonization of results by available methods is still a far-reaching goal and the approach to interpret an individual's results should be improved. Tracing a roadmap for B₁₂ testing by exploiting the HTA model to balance the stakeholders' claims and maximizing the patient's outcome may help to manage the marker demand.

  10. Alertness management in two-person long-haul flight operations

    NASA Technical Reports Server (NTRS)

    Rosekind, M. R.; Gander, P. H.

    1992-01-01

    Long-haul flight operations involve cumulative sleep loss, circadian disruption, and extended and irregular duty schedules. These factors reduce pilot alertness and performance on the flightdeck. Conceptually and operationally, alertness management in flight operations can be divided into preventive strategies and operational countermeasures. Preventive strategies are utilized prior to a duty period to mitigate or reduce the effects of sleep loss, circadian disruption and fatigue during subsequent flight operations. Operational countermeasures are used during operations as acute techniques for maintaining performance and alertness. Results from previous NASA Ames field studies document the sleep loss and circadian disruption in three-person long-haul flying and illustrate the application of preventive strategies and operational countermeasures. One strategy that can be used in both a preventive and operational manner is strategic napping. The application and effectiveness of strategic napping in long-haul operations will be discussed. Finally, long-haul flying in two-person highly automated aircraft capable of extended range operations will create new challenges to maintaining pilot alertness and performance. Alertness management issues in this flight environment will be explored.

  11. Need of risk management practice amongst bumiputera contractors in Malaysia construction industries

    NASA Astrophysics Data System (ADS)

    Syuhada Fadzil, Nur; Noor, Nurazuwa Md; Rahman, Ismail Abdul

    2017-11-01

    Malaysia construction industry has been growing continuously with double-digit growth for the past two decades. There are many issues surrounded the industry such as delay in delivery, cost overrun, quality and safety. In bumiputera contractor’s context, the literature review found that 32 issues were encountered in the construction project. These issues can be handled properly with the application of risk management. According to previous researchers, application of risk management in Malaysia construction industry is at the low level where it is implemented in traditional ways that are brainstorming and checklist. These were due to lack of knowledge, the high cost of hiring experts and avoiding extra cost. Besides that, this study also intentions to analyse the risk categories in the construction industry as well as identify risk management process to resolve the construction issues. Hence, this paper presents issues engulfed by Bumiputera contractors which can partly be resolved by applying risk management practice in carrying out the construction activity. This may inspire the contractors to apply the risk management practice in ensuring the success of their construction project.

  12. Identification of Communication and Coordination Issues in the US Air Traffic Control System

    NASA Technical Reports Server (NTRS)

    Davison, Hayley J.; Hansman, R. John

    2001-01-01

    Today's air traffic control system is approaching the point of saturation, as evidenced by increasing delays across the National Airspace System (NAS). There exists an opportunity to enhance NAS efficiency and reduce delays by improving strategic communication throughout the ATC system. Although several measures have been taken to improve communication (e.g., Collaborative Decision Making tools), communication issues between ATC facilities remain. It is hypothesized that by identifying the key issues plaguing inter-facility strategic communication, steps can be taken to enhance these communications, and therefore ATC system efficiency. In this report, a series of site visits were performed at Boston and New York ATC facilities as well as at the Air Traffic Control System Command Center. The results from these site visits were used to determine the current communication and coordination structure of Traffic Management Coordinators, who hold a pivotal role in inter-facility communications. Several themes emerged from the study, including: ambiguity of organizational structure in the current ATC system, awkward coordination between ATC facilities, information flow issues, organizational culture issues, and negotiation behaviors used to cope with organizational culture issues.

  13. Data management issues in mobile ad hoc networks

    PubMed Central

    HARA, Takahiro

    2017-01-01

    Research on mobile ad hoc networks (MANETs) has become a hot research topic since the middle 1990’s. Over the first decade, most research focused on networking techniques, ignoring data management issues. We, however, realized early the importance of data management in MANETs, and have been conducting studies in this area for 15 years. In this review, we summarize some key technical issues related to data management in MANETs, and the studies we have done in addressing these issues, which include placement of data replicas, update management, and query processing with security management. The techniques proposed in our studies have been designed with deep considerations of MANET features including network partitioning, node participation/disappearance, limited network bandwidth, and energy efficiency. Our studies published in early 2000’s have developed a new research field as data management in MANETs. Also, our recent studies are expected to be significant guidelines of new research directions. We conclude the review by discussing some future directions for research. PMID:28496052

  14. Data management issues in mobile ad hoc networks.

    PubMed

    Hara, Takahiro

    2017-01-01

    Research on mobile ad hoc networks (MANETs) has become a hot research topic since the middle 1990's. Over the first decade, most research focused on networking techniques, ignoring data management issues. We, however, realized early the importance of data management in MANETs, and have been conducting studies in this area for 15 years. In this review, we summarize some key technical issues related to data management in MANETs, and the studies we have done in addressing these issues, which include placement of data replicas, update management, and query processing with security management. The techniques proposed in our studies have been designed with deep considerations of MANET features including network partitioning, node participation/disappearance, limited network bandwidth, and energy efficiency. Our studies published in early 2000's have developed a new research field as data management in MANETs. Also, our recent studies are expected to be significant guidelines of new research directions. We conclude the review by discussing some future directions for research.

  15. The role of disease management in pay-for-performance programs for improving the care of chronically ill patients.

    PubMed

    Beich, Jeff; Scanlon, Dennis P; Ulbrecht, Jan; Ford, Eric W; Ibrahim, Ibrahim A

    2006-02-01

    To date, pay-for-performance programs targeting the care of persons with chronic conditions have primarily been directed at physicians and provide an alternative to health plan-sponsored chronic disease management (DM) programs. Both approaches require similar infrastructure, and each has its own advantages and disadvantages for program implementation. Pay-for-performance programs use incentives based on patient outcomes; however, an alternative system might incorporate measures of structure and process. Using a conceptual framework, the authors explore the variation in 50 diabetes DM programs using data from the 2002 National Business Coalition on Health's eValue8 Request for Information (RFI). The authors raise issues relevant to the assignment of accountability for patient outcomes to either health plans or physicians. They analyze the association between RFI scores measuring structures and processes, and HEDIS diabetes intermediate outcome measures. Finally, the strengths and weaknesses of using the RFI scores as an alternative metric for pay-for-performance programs are discussed.

  16. Issues in Coastal Zone Management.

    ERIC Educational Resources Information Center

    Davis, Derrin

    1992-01-01

    Addresses the following issues relevant to coastal zone management: overcrowding, resource exploitation, pollution, agriculture, fisheries, industrial, and other uses. Describes conflicts and trade-offs in management typified by fragmented agency decision making. Discusses implications of the greenhouse effect, sustainable development, and the…

  17. Special Issue: Book Reviews 2002-2003.

    ERIC Educational Resources Information Center

    Grauer, Barbara Ellman, Ed.

    2003-01-01

    This special issue reviews 71 books on the following topics: career management; career opportunities for people with disabilities; federal government career information; college career development/counseling; job search strategies, tools, methods; coaching; retirement issues; strategies for managers; women and careers; general career books; and…

  18. Building on common ground to address biodiversity conflicts and foster collaboration in environmental management.

    PubMed

    Lecuyer, Lou; White, Rehema M; Schmook, Birgit; Calmé, Sophie

    2018-08-15

    Conservation biology faces critical challenges that require collaborative approaches, including novel strategies to support interactions among actors in biodiversity conflicts. The goals of this study were to investigate the concept of common ground across multiple issues and to explore its practical application for the support of environmental management. We conceptually defined common ground as the areas of relevance underlying the suite of issues expressed by people regarding environmental management in a particular context. We then empirically tested this in the Calakmul region of Mexico, where the complex socio-historical context and high biodiversity have created environmental management challenges that are now being addressed by a local, multi-stakeholder management board. We conducted 26 open interviews with members of the board and a further round of quantitative prioritisation of issues raised. Using a coding process designed to reveal common ground, we categorized the issues at four levels ranging from coarse to fine (themes, topics, sub-topics and perspectives). We then analysed two levels, topics (n = 14 issues) and sub-topics (n = 51 issues). To do so, we built common ground matrices to identify and analyze common ground among actors and across issues. First, cluster and non-metrical data analyses revealed the diversity of actor positions and the lack of consistent grouping among actors by occupational activity. This demonstrated that focusing on actors' differences might be misleading, and that actors' views were not closely aligned with their roles. Second, we located issues according to their levels of common ground and importance among actors. We showed that by not focusing on single issue conflicts, the identification of common ground across multiple issues can pinpoint synergies. We then proposed a framework for collaboration that prioritizes issues of high importance with greater common ground (e.g. sustainable resource use activities), to support the development of trust and norms of reciprocity among actors, strengthening the potential for future cooperation. By adopting this approach, environmental managers could support the initial stages of collaborative conservation strategies, engaging with other actors to seek common ground, avoid the creation of polarised groups and help effectively manage biodiversity conflicts. Copyright © 2018 Elsevier Ltd. All rights reserved.

  19. DPM: Future Proof Storage

    NASA Astrophysics Data System (ADS)

    Alvarez, Alejandro; Beche, Alexandre; Furano, Fabrizio; Hellmich, Martin; Keeble, Oliver; Rocha, Ricardo

    2012-12-01

    The Disk Pool Manager (DPM) is a lightweight solution for grid enabled disk storage management. Operated at more than 240 sites it has the widest distribution of all grid storage solutions in the WLCG infrastructure. It provides an easy way to manage and configure disk pools, and exposes multiple interfaces for data access (rfio, xroot, nfs, gridftp and http/dav) and control (srm). During the last year we have been working on providing stable, high performant data access to our storage system using standard protocols, while extending the storage management functionality and adapting both configuration and deployment procedures to reuse commonly used building blocks. In this contribution we cover in detail the extensive evaluation we have performed of our new HTTP/WebDAV and NFS 4.1 frontends, in terms of functionality and performance. We summarize the issues we faced and the solutions we developed to turn them into valid alternatives to the existing grid protocols - namely the additional work required to provide multi-stream transfers for high performance wide area access, support for third party copies, credential delegation or the required changes in the experiment and fabric management frameworks and tools. We describe new functionality that has been added to ease system administration, such as different filesystem weights and a faster disk drain, and new configuration and monitoring solutions based on the industry standards Puppet and Nagios. Finally, we explain some of the internal changes we had to do in the DPM architecture to better handle the additional load from the analysis use cases.

  20. An Analysis of the Impact of RFID Technology on Inventory Systems

    NASA Astrophysics Data System (ADS)

    Rekik, Yacine

    Nowadays, most enterprises undertake large investments in order to implement information systems that support decision making for managing inventories. Nevertheless, if data collected from the physical processes used to feed these systems are not correct, there will be severe impacts on business performance. Inventory inaccuracy occurs when the inventory level in the Information System is not in agreement with the physically available inventory. In this chapter, we first describe the major factors generating inventory inaccuracy. Then, we provide situations permitting to manage an inventory system subject to errors. We provide a framework to model the inventory inaccuracy issue and focus on the impact of advanced identification systems, such as that provided by RFID technology, in improving the performance of a supply chain subject to inventory inaccuracies.

  1. 75 FR 12521 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-16

    ...On February 26, 2010, the Department of Education published a 30-day comment period notice in the Federal Register (Page 8928, Column 3) seeking public comment for an information collection entitled, ``Native American Career and Technical Education Program (NACTEP)''. This notice is hereby cancelled. NACTEP 1830-0542 is the application portion of the NACTEP grant. The application does not need extension as it is the performance reporting stage of the grant. The performance report will need its own OMB number and run under a full clearance with a 60-day/30-day public comment period. The application will be discontinued until reinstatement in 2012. The Acting Director, Information Collection Clearance Division, Regulatory Information Management Services, Office of Management, hereby issues a correction notice as required by the Paperwork Reduction Act of 1995.

  2. National Aeronautics and Space Administration fundamental research program. Information utilization and evaluation, appendices

    NASA Technical Reports Server (NTRS)

    Estes, J. E.; Eisgruber, L.

    1981-01-01

    Important points presented and recommendations made at an information and decision processes workshop held in Asilomar, California; at a data and information performance workshop held in Houston, Texas; and at a data base use and management workshop held near San Jose, California are summarized. Issues raised at a special session of the Soil Conservation Society of America's remote sensing for resource management conference in Kansas City, Missouri are also highlighted. The goals, status and activities of the NASA program definition study of basic research requirements, the necessity of making the computer science community aware of user needs with respect to information related to renewable resources, performance parameters and criteria for judging federal information systems, and the requirements and characteristics of scientific data bases are among the topics reported.

  3. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1989-01-01

    This new collection of papers on aerospace management issues contains a history of NASA program and project management, some lessons learned in the areas of management and budget from the Space Shuttle Program, an analysis of tools needed to keep large multilayer programs organized and on track, and an update of resources for NASA managers. A wide variety of opinions and techniques are presented.

  4. Mountain biking: issues and actions for USDA Forest Service managers

    Treesearch

    Deborah J. Chavez

    1996-01-01

    Managers of National Forests are faced with many challenges related to the growing use of mountain bikes. To determine the issues and management actions associated with this growth, USDA Forest Service managers from across the United States were surveyed. Managers from at least two National Forests from every Region (except Alaska) reported annual use of trails by 10,...

  5. Nursing churn and turnover in Australian hospitals: nurses perceptions and suggestions for supportive strategies

    PubMed Central

    2014-01-01

    Background This study aimed to reveal nurses’ experiences and perceptions of turnover in Australian hospitals and identify strategies to improve retention, performance and job satisfaction. Nursing turnover is a serious issue that can compromise patient safety, increase health care costs and impact on staff morale. A qualitative design was used to analyze responses from 362 nurses collected from a national survey of nurses from medical and surgical nursing units across 3 Australian States/Territories. Method A qualitative design was used to analyze responses from 362 nurses collected from a national survey of nurses from medical and surgical nursing units across 3 Australian States/Territories. Results Key factors affecting nursing turnover were limited career opportunities; poor support; a lack of recognition; and negative staff attitudes. The nursing working environment is characterised by inappropriate skill-mix and inadequate patient-staff ratios; a lack of overseas qualified nurses with appropriate skills; low involvement in decision-making processes; and increased patient demands. These issues impacted upon heavy workloads and stress levels with nurses feeling undervalued and disempowered. Nurses described supportive strategies: improving performance appraisals, responsive preceptorship and flexible employment options. Conclusion Nursing turnover is influenced by the experiences of nurses. Positive steps can be made towards improving workplace conditions and ensuring nurse retention. Improving performance management and work design are strategies that nurse managers could harness to reduce turnover. PMID:24708565

  6. Nursing churn and turnover in Australian hospitals: nurses perceptions and suggestions for supportive strategies.

    PubMed

    Dawson, Angela J; Stasa, Helen; Roche, Michael A; Homer, Caroline S E; Duffield, Christine

    2014-04-08

    This study aimed to reveal nurses' experiences and perceptions of turnover in Australian hospitals and identify strategies to improve retention, performance and job satisfaction. Nursing turnover is a serious issue that can compromise patient safety, increase health care costs and impact on staff morale. A qualitative design was used to analyze responses from 362 nurses collected from a national survey of nurses from medical and surgical nursing units across 3 Australian States/Territories. A qualitative design was used to analyze responses from 362 nurses collected from a national survey of nurses from medical and surgical nursing units across 3 Australian States/Territories. Key factors affecting nursing turnover were limited career opportunities; poor support; a lack of recognition; and negative staff attitudes. The nursing working environment is characterised by inappropriate skill-mix and inadequate patient-staff ratios; a lack of overseas qualified nurses with appropriate skills; low involvement in decision-making processes; and increased patient demands. These issues impacted upon heavy workloads and stress levels with nurses feeling undervalued and disempowered. Nurses described supportive strategies: improving performance appraisals, responsive preceptorship and flexible employment options. Nursing turnover is influenced by the experiences of nurses. Positive steps can be made towards improving workplace conditions and ensuring nurse retention. Improving performance management and work design are strategies that nurse managers could harness to reduce turnover.

  7. The integration of the risk management process with the lifecycle of medical device software.

    PubMed

    Pecoraro, F; Luzi, D

    2014-01-01

    The application of software in the Medical Device (MD) domain has become central to the improvement of diagnoses and treatments. The new European regulations that specifically address software as an important component of MD, require complex procedures to make software compliant with safety requirements, introducing thereby new challenges in the qualification and classification of MD software as well as in the performance of risk management activities. Under this perspective, the aim of this paper is to propose an integrated framework that combines the activities to be carried out by the manufacturer to develop safe software within the development lifecycle based on the regulatory requirements reported in US and European regulations as well as in the relevant standards and guidelines. A comparative analysis was carried out to identify the main issues related to the application of the current new regulations. In addition, standards and guidelines recently released to harmonise procedures for the validation of MD software have been used to define the risk management activities to be carried out by the manufacturer during the software development process. This paper highlights the main issues related to the qualification and classification of MD software, providing an analysis of the different regulations applied in Europe and the US. A model that integrates the risk management process within the software development lifecycle has been proposed too. It is based on regulatory requirements and considers software risk analysis as a central input to be managed by the manufacturer already at the initial stages of the software design, in order to prevent MD failures. Relevant changes in the process of MD development have been introduced with the recognition of software being an important component of MDs as stated in regulations and standards. This implies the performance of highly iterative processes that have to integrate the risk management in the framework of software development. It also makes it necessary to involve both medical and software engineering competences to safeguard patient and user safety.

  8. Space station human productivity study. Volume 5: Management plans

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The 67 Management Plans represent recommended study approaches for resolving 108 of the 305 Issues which were identified. Each study Management Plan is prepared in three formats: Management Plan Overview (lists the subsumed Issues, study background, and related overview information); Study Plan (details the study approach by tasks, lists special needs, and describes expected study products); Schedule-Task Flow (provides a time-lined schedule for the study tasks and resource requirements). The Management Relationships Matrix, included in this volume, shows the data input-output relationships among all recommended studies. A listing is also included which cross-references the unresolved requirements to Issues to management plans. A glossary of all abbreviations utilized is provided.

  9. A case study of the Australian Plague Locust Commission and environmental due diligence: why mere legislative compliance is no longer sufficient for environmentally responsible locust control in Australia.

    PubMed

    Story, Paul G; Walker, Paul W; McRae, Heath; Hamilton, John G

    2005-07-01

    The Australian Plague Locust Commission (APLC) manages locust populations across 2 million square kilometers of eastern Australia using the aerial application of chemical and biological control agents to protect agricultural production. This occurs via a preventative control strategy involving ultralow-volume spray equipment to distribute small droplets of control agent over a target area. The economic costs of, and potential gains stemming from, locust control are well documented. The application of insecticides, however, to fragile arid and semiarid ecosystems is a task that brings with it both real and perceived environmental issues. The APLC is proactive in addressing these issues through a combination of targeted environmental operational research, an ISO-14001-aligned Environmental Management System (EMS), and links with environmental regulatory and research institutions. Increasing due diligence components within Australian environmental legislation dictate that mere legislative compliance is no longer sufficient for industries to ensure that they meet their environmental obligations. The development of external research links and the formulation of an EMS for locust control have enabled the APLC to identify environmental issues and trends, quantify objective environmental targets and strategies, and facilitate continuous improvement in its environmental performance, while maintaining stakeholder support. This article outlines the environmental issues faced by the APLC, the research programs in place to address these issues, and the procedures in place to incorporate research findings into the organization's operational structure.

  10. Management of pregnancy in woman with suspected malignant deep infiltrating endometriosis fistulised to the uterine cervix.

    PubMed

    Richard, Frederic; Canlorbe, Geoffroy; Bazot, Marc; Daraï, Emile

    2014-06-04

    Deep infiltrating endometriosis (DIE) is a well-known cause of pelvic pain and infertility. Malignant transformation of DIE is rare but can be suggested by MRI. We report a case of a spontaneous pregnancy in a woman with suspicion of malignant transformation of DIE with fistulisation to the posterior uterine isthmus through to the cervical canal. The pregnancy was closely monitored and an uneventful caesarian section was performed at 34 weeks of gestation. This case raises the issue of the relevance of imaging techniques and management of pregnancy. 2014 BMJ Publishing Group Ltd.

  11. Analysis article: accuracy of the DIDGET glucose meter in children and young adults with diabetes.

    PubMed

    Kim, Sarah

    2011-09-01

    Diabetes is one of the most common chronic diseases among American children. Although studies show that intensive management, including frequent glucose testing, improves diabetes control, this is difficult to accomplish. Bayer's DIDGET® glucose meter system pairs with a popular handheld video game system and couples good blood glucose testing habits with video-game-based rewards. In this issue, Deeb and colleagues performed a study demonstrating the accuracy of the DIDGET meter, a critical asset to this novel product designed to alleviate some of the challenges of managing pediatric diabetes. © 2011 Diabetes Technology Society.

  12. Identifying nurse and health visitor priorities in a PCT using the Delphi technique.

    PubMed

    Brooks, Nicky; Barrett, Anna

    2003-08-01

    A three-stage Delphi investigation was undertaken over a 4-month period in a primary care trust to identify the perceived clinical needs of nurses. Practice nurses, district nurses, health visitors and community hospital nurses all participated. In round 1, there were 28 replies from these groups of nurses, in round 2 there were 31, and in round 3 there were 25 replies. In round 1, 77 issues (excluding duplications) were identified. These were separated into three themes according to the most appropriate method for addressing the issue: education (29 issues), research (16 issues) and management (32). In round 2, the issues were redistributed in the three areas and staff were asked to choose the ten most important issues from education, research and management. Finally, in round 3 the ten issues in education, research and management were prioritized in terms of the "most pressing". The most pressing education need was recognizing accountability; the most pressing research need was caseload/dependency scoring--matching staff levels to workload, and the most pressing management need was risk management, e.g. staff safety. The results have identified locally that there is a gap between the modernization agenda and what nursing staff consider to be the issues that need addressing locally. If measures are not put in place to address these local issues, there is a danger that nurses will not take a full and active role in the modernization of the NHS.

  13. Space station operations task force. Panel 4 report: Management integration

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The Management Integration Panel of the Space Station Operations Task Force was chartered to provide a structure and ground rules for integrating the efforts of the other three panels and to address a number of cross cutting issues that affect all areas of space station operations. Issues addressed include operations concept implementation, alternatives development and integration process, strategic policy issues and options, and program management emphasis areas.

  14. Optimal management of adults with pharyngitis – a multi-criteria decision analysis

    PubMed Central

    Singh, Sonal; Dolan, James G; Centor, Robert M

    2006-01-01

    Background Current practice guidelines offer different management recommendations for adults presenting with a sore throat. The key issue is the extent to which the clinical likelihood of a Group A streptococcal infection should affect patient management decisions. To help resolve this issue, we conducted a multi-criteria decision analysis using the Analytic Hierarchy Process. Methods We defined optimal patient management using four criteria: 1) reduce symptom duration; 2) prevent infectious complications, local and systemic; 3) minimize antibiotic side effects, minor and anaphylaxis; and 4) achieve prudent use of antibiotics, avoiding both over-use and under-use. In our baseline analysis we assumed that all criteria and sub-criteria were equally important except minimizing anaphylactic side effects, which was judged very strongly more important than minimizing minor side effects. Management strategies included: a) No test, No treatment; b) Perform a rapid strep test and treat if positive; c) Perform a throat culture and treat if positive; d) Perform a rapid strep test and treat if positive; if negative obtain a throat culture and treat if positive; and e) treat without further tests. We defined four scenarios based on the likelihood of group A streptococcal infection using the Centor score, a well-validated clinical index. Published data were used to estimate the likelihoods of clinical outcomes and the test operating characteristics of the rapid strep test and throat culture for identifying group A streptococcal infections. Results Using the baseline assumptions, no testing and no treatment is preferred for patients with Centor scores of 1; two strategies – culture and treat if positive and rapid strep with culture of negative results – are equally preferable for patients with Centor scores of 2; and rapid strep with culture of negative results is the best management strategy for patients with Centor scores 3 or 4. These results are sensitive to the priorities assigned to the decision criteria, especially avoiding over-use versus under-use of antibiotics, and the population prevalence of Group A streptococcal pharyngitis. Conclusion The optimal clinical management of adults with sore throat depends on both the clinical probability of a group A streptococcal infection and clinical judgments that incorporate individual patient and practice circumstances. PMID:16533386

  15. Investigations on optimization of accident management measures following a station blackout accident in a VVER-1000 pressurized water reactor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tusheva, P.; Schaefer, F.; Kliem, S.

    2012-07-01

    The reactor safety issues are of primary importance for preserving the health of the population and ensuring no release of radioactivity and fission products into the environment. A part of the nuclear research focuses on improvement of the safety of existing nuclear power plants. Studies, research and efforts are a continuing process at improving the safety and reliability of existing and newly developed nuclear power plants at prevention of a core melt accident. Station blackout (loss of AC power supply) is one of the dominant accidents taken into consideration at performing accident analysis. In case of multiple failures of safetymore » systems it leads to a severe accident. To prevent an accident to turn into a severe one or to mitigate the consequences, accident management measures must be performed. The present paper outlines possibilities for application and optimization of accident management measures following a station blackout accident. Assessed is the behaviour of the nuclear power plant during a station blackout accident without accident management measures and with application of primary/secondary side oriented accident management measures. Discussed are the possibilities for operators ' intervention and the influence of the performed accident management measures on the course of the accident. Special attention has been paid to the effectiveness of the passive feeding and physical phenomena having an influence on the system behaviour. The performed simulations show that the effectiveness of the secondary side feeding procedure can be limited due to an early evaporation or flashing effects in the feed water system. The analyzed cases show that the effectiveness of the accident management measures strongly depends on the initiation criteria applied for depressurization of the reactor coolant system. (authors)« less

  16. Immunotherapy in allergy and cellular tests

    PubMed Central

    Chirumbolo, Salvatore

    2014-01-01

    The basophil activation test (BAT) is an in vitro assay where the activation of basophils upon exposure to various IgE-challenging molecules is measured by flow cytometry. It is a cellular test able to investigate basophil behavior during allergy and allergy immunotherapy. A panoply of critical issues and suggestive advances have rendered this assay a promising yet puzzling tool to endeavor a full comprehension of innate immunity of allergy desensitization and manage allergen or monoclonal anti-IgE therapy. In this review a brief state of art of BAT in immunotherapy is described focusing onto the analytical issue pertaining BAT performance in allergy specific therapy. PMID:24717453

  17. Health-Based Capitation Risk Adjustment in Minnesota Public Health Care Programs

    PubMed Central

    Gifford, Gregory A.; Edwards, Kevan R.; Knutson, David J.

    2004-01-01

    This article documents the history and implementation of health-based capitation risk adjustment in Minnesota public health care programs, and identifies key implementation issues. Capitation payments in these programs are risk adjusted using an historical, health plan risk score, based on concurrent risk assessment. Phased implementation of capitation risk adjustment for these programs began January 1, 2000. Minnesota's experience with capitation risk adjustment suggests that: (1) implementation can accelerate encounter data submission, (2) administrative decisions made during implementation can create issues that impact payment model performance, and (3) changes in diagnosis data management during implementation may require changes to the payment model. PMID:25372356

  18. 41 CFR 101-26.301-2 - Issue of used, repaired, and rehabilitated items in serviceable condition.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Issue of used, repaired... and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.3-Procurement of GSA Stock Items...

  19. Implementing a Group Contingency Behavior-Management System in Physical Education

    ERIC Educational Resources Information Center

    Healy, Sean; Hirsch, Shanna E.; Lloyd, John W.

    2017-01-01

    Behavior management issues may impede learning in physical education (PE), yet there is a paucity of evidence-based behavior-management programs studied in the PE environment to assist PE teachers to be better prepared to handle these issues. Classwide-function intervention teams (CW-FIT) is a group contingency procedure for managing student…

  20. Stop the Pediatric Obesity Epidemic: Is the EMR a Solution to Alert Providers?

    ERIC Educational Resources Information Center

    Williams, Kim

    2016-01-01

    Introduction: Weight management is an unrelenting issue affecting people of all ages. Addressing weight management is among the priority health concerns in the United States. Evidence suggests that some health providers are not recognizing or managing patients' weight management issues. The electronic medical record and automation may help…

  1. 41 CFR 101-25.101-2 - Supply through storage and issue.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Supply through storage and issue. 101-25.101-2 Section 101-25.101-2 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 25-GENERAL 25.1...

  2. Airborne Management of Traffic Conflicts in Descent With Arrival Constraints

    NASA Technical Reports Server (NTRS)

    Doble, Nathan A.; Barhydt, Richard; Krishnamurthy, Karthik

    2005-01-01

    NASA is studying far-term air traffic management concepts that may increase operational efficiency through a redistribution of decisionmaking authority among airborne and ground-based elements of the air transportation system. One component of this research, En Route Free Maneuvering, allows trained pilots of equipped autonomous aircraft to assume responsibility for traffic separation. Ground-based air traffic controllers would continue to separate traffic unequipped for autonomous operations and would issue flow management constraints to all aircraft. To evaluate En Route Free Maneuvering operations, a human-in-the-loop experiment was jointly conducted by the NASA Ames and Langley Research Centers. In this experiment, test subject pilots used desktop flight simulators to resolve conflicts in cruise and descent, and to adhere to air traffic flow constraints issued by test subject controllers. Simulators at NASA Langley were equipped with a prototype Autonomous Operations Planner (AOP) flight deck toolset to assist pilots with conflict management and constraint compliance tasks. Results from the experiment are presented, focusing specifically on operations during the initial descent into the terminal area. Airborne conflict resolution performance in descent, conformance to traffic flow management constraints, and the effects of conflicting traffic on constraint conformance are all presented. Subjective data from subject pilots are also presented, showing perceived levels of workload, safety, and acceptability of autonomous arrival operations. Finally, potential AOP functionality enhancements are discussed along with suggestions to improve arrival procedures.

  3. Identifying challenges for academic leadership in medical universities in Iran.

    PubMed

    Bikmoradi, Ali; Brommels, Mats; Shoghli, Alireza; Khorasani-Zavareh, Davoud; Masiello, Italo

    2010-05-01

    CONTEXT The crucial role of academic leadership in the success of higher education institutions is well documented. Medical education in Iran has been integrated into the health care system through a complex organisational change. This has called into question the current academic leadership, making Iranian medical universities and schools a good case for exploring the challenges of academic leadership. OBJECTIVES This study explores the leadership challenges perceived by academic managers in medical schools and universities in Iran. METHODS A qualitative study using 18 face-to-face, in-depth interviews with academic managers in medical universities and at the Ministry of Health and Medical Education in Iran was performed. All interviews were recorded digitally, transcribed verbatim and analysed by qualitative content analysis. RESULTS The main challenges to academic leadership could be categorised under three themes, each of which included three sub-themes: organisational issues (inefficacy of academic governance; an overly extensive set of missions and responsibilities; concerns about the selection of managers); managerial issues (management styles; mismatch between authority and responsibilities; leadership capabilities), and organisational culture (tendency towards governmental management; a boss-centred culture; low motivation). CONCLUSIONS This study emphasises the need for academic leadership development in Iranian medical schools and universities. The ability of Iranian universities to grow and thrive will depend ultimately upon the application of leadership skills. Thus, it is necessary to better designate authorities, roles of academic staff and leaders at governance.

  4. Monitoring the status of forests and rangelands in the Western United States using ecosystem performance anomalies

    USGS Publications Warehouse

    Rigge, Matthew B.; Wylie, Bruce; Gu, Yingxin; Belnap, Jayne; Phuyal, Khem P.; Tieszen, Larry

    2013-01-01

    The effects of land management and disturbance on ecosystem performance (i.e. biomass production) are often confounded by those of weather and site potential. The current study overcomes this issue by calculating the difference between actual and expected ecosystem performance (EEP) to generate ecosystem performance anomalies (EPA). This study aims to delineate and quantify average EPA from 2000–2009 within the Greater Platte and Upper Colorado River Basins, USA. Moderate Resolution Imaging Spectroradiometer (MODIS) normalized difference vegetation index (NDVI) images averaged over the growing season (GSN) served as a proxy of actual ecosystem performance. Yearly EEP was determined with rule-based piecewise regression tree models of abiotic data (climate, soils, elevation, etc.), independently created for each land cover. EPA were calculated as the residuals of the EEP to GSN relationship, and characterized as normal performing, underperforming, and overperforming at the 90% confidence level. Validation revealed that EPA values were related to biomass production (R2 = 0.56, P = 0.02) and likely to the proportion of biomass removed by livestock in the Nebraska Sandhills. Overall, 60.6% of the study area was (normal) performing near its EEP, 3.0% was severely underperforming, 5.0% was highly overperforming, and the remainder was slightly underperforming or overperforming. Generally, disturbances such as fires, floods, and insect damage, in addition to high grazing intensity, result in a negative EPA. Conversely, mature stands and appropriate management often result in positive EPA values. This method provides information critical to land managers to evaluate the appropriateness of previous management practices and restoration efforts and quantify disturbance impacts. Results are at a scale sufficient for many of the large management units of the region and for locating areas needing further investigation. Applications of EPA data to monitoring invasive species, grazing impacts, and vulnerability to plant community shifts have been suggested by land management professionals.

  5. Using key performance indicators as knowledge-management tools at a regional health-care authority level.

    PubMed

    Berler, Alexander; Pavlopoulos, Sotiris; Koutsouris, Dimitris

    2005-06-01

    The advantages of the introduction of information and communication technologies in the complex health-care sector are already well-known and well-stated in the past. It is, nevertheless, paradoxical that although the medical community has embraced with satisfaction most of the technological discoveries allowing the improvement in patient care, this has not happened when talking about health-care informatics. Taking the above issue of concern, our work proposes an information model for knowledge management (KM) based upon the use of key performance indicators (KPIs) in health-care systems. Based upon the use of the balanced scorecard (BSC) framework (Kaplan/Norton) and quality assurance techniques in health care (Donabedian), this paper is proposing a patient journey centered approach that drives information flow at all levels of the day-to-day process of delivering effective and managed care, toward information assessment and knowledge discovery. In order to persuade health-care decision-makers to assess the added value of KM tools, those should be used to propose new performance measurement and performance management techniques at all levels of a health-care system. The proposed KPIs are forming a complete set of metrics that enable the performance management of a regional health-care system. In addition, the performance framework established is technically applied by the use of state-of-the-art KM tools such as data warehouses and business intelligence information systems. In that sense, the proposed infrastructure is, technologically speaking, an important KM tool that enables knowledge sharing amongst various health-care stakeholders and between different health-care groups. The use of BSC is an enabling framework toward a KM strategy in health care.

  6. Pharmacy executives: leadership issues and associated skills, knowledge, and abilities in the U.S. Department of Defense.

    PubMed

    Meadows, Andrew B; Finstuen, Kenn; Hudak, Ronald P

    2003-01-01

    To identify the issues or problems that current and aspiring U.S. Department of Defense (DoD) pharmacy executives will face in the future and to define the skills, knowledge, and abilities (SKAs) required to successfully address these issues. Delphi method for executive decision making. DoD. Ninety-three pharmacists serving in the military grades of lieutenant colonel/commander and colonel/captain, as well as pharmacists selected for promotion to those grades. iterations of the Delphi method for executive decision making separated by an expert panel content analysis. Round 1--participants identified five major issues believed to be of greatest importance to pharmacy executives and reported specific SKAs that might be needed to successfully manage those issues. An expert panel sorted these issues into meaningful domains, then provided an appropriate title for each domain. Round 2--on a 7-point scale, respondents rated the SKA items according to their assessment of how much a future DoD pharmacy executive would need each SKA. Response rates were 44.1% and 46.2% for Delphi rounds 1 and 2, respectively. The first round generated 62 unique issues facing pharmacy executives. The expert panel reviewed and sorted the issues into eight domains and selected an appropriate title for each domain. The domains identified by the panel were human resources, pharmacy operations/business practices, information management and technology, financial resources, formulary management, drug therapy management, pharmacy benefit management, and leadership. During round 2, 73.3% of the top 15 rated SKAs came from the drug therapy management, leadership, and formulary management domains. The three highest-rated SKAs were "ability to see the big picture," "ability to build strong relations with medical staffs," and "skills in both writing and verbal communication." The issues facing future DoD pharmacy executives will require them to expand their clinical abilities as well as their ability to collaborate and communicate with other professionals.

  7. Ethical Issues in Volunteer Management and Accountability.

    ERIC Educational Resources Information Center

    Netting, F. Ellen

    1987-01-01

    Examines the ethical issues surrounding President Reagan's directive to "Go back to the voluntary sector." Discusses trends which currently affect ethical issues of managing volunteer agencies/programs. Recommends proactive steps to be taken in developing the potential of voluntary organizations, identifying organizations' bases of support,…

  8. Use of simulation to assess electronic health record safety in the intensive care unit: a pilot study

    PubMed Central

    March, Christopher A; Steiger, David; Scholl, Gretchen; Mohan, Vishnu; Hersh, William R; Gold, Jeffrey A

    2013-01-01

    Objective To establish the role of high-fidelity simulation training to test the efficacy and safety of the electronic health record (EHR)–user interface within the intensive care unit (ICU) environment. Design Prospective pilot study. Setting Medical ICU in an academic medical centre. Participants Postgraduate medical trainees. Interventions A 5-day-simulated ICU patient was developed in the EHR including labs, hourly vitals, medication administration, ventilator settings, nursing and notes. Fourteen medical issues requiring recognition and subsequent changes in management were included. Issues were chosen based on their frequency of occurrence within the ICU and their ability to test different aspects of the EHR–user interface. ICU residents, blinded to the presence of medical errors within the case, were provided a sign-out and given 10 min to review the case in the EHR. They then presented the case with their management suggestions to an attending physician. Participants were graded on the number of issues identified. All participants were provided with immediate feedback upon completion of the simulation. Primary and secondary outcomes To determine the frequency of error recognition in an EHR simulation. To determine factors associated with improved performance in the simulation. Results 38 participants including 9 interns, 10 residents and 19 fellows were tested. The average error recognition rate was 41% (range 6–73%), which increased slightly with the level of training (35%, 41% and 50% for interns, residents, and fellows, respectively). Over-sedation was the least-recognised error (16%); poor glycemic control was most often recognised (68%). Only 32% of the participants recognised inappropriate antibiotic dosing. Performance correlated with the total number of screens used (p=0.03). Conclusions Despite development of comprehensive EHRs, there remain significant gaps in identifying dangerous medical management issues. This gap remains despite high levels of medical training, suggesting that EHR-specific training may be beneficial. Simulation provides a novel tool in order to both identify these gaps as well as foster EHR-specific training. PMID:23578685

  9. Scaling up antiretroviral therapy in Uganda: using supply chain management to appraise health systems strengthening

    PubMed Central

    2011-01-01

    Background Strengthened national health systems are necessary for effective and sustained expansion of antiretroviral therapy (ART). ART and its supply chain management in Uganda are largely based on parallel and externally supported efforts. The question arises whether systems are being strengthened to sustain access to ART. This study applies systems thinking to assess supply chain management, the role of external support and whether investments create the needed synergies to strengthen health systems. Methods This study uses the WHO health systems framework and examines the issues of governance, financing, information, human resources and service delivery in relation to supply chain management of medicines and the technologies. It looks at links and causal chains between supply chain management for ART and the national supply system for essential drugs. It combines data from the literature and key informant interviews with observations at health service delivery level in a study district. Results Current drug supply chain management in Uganda is characterized by parallel processes and information systems that result in poor quality and inefficiencies. Less than expected health system performance, stock outs and other shortages affect ART and primary care in general. Poor performance of supply chain management is amplified by weak conditions at all levels of the health system, including the areas of financing, governance, human resources and information. Governance issues include the lack to follow up initial policy intentions and a focus on narrow, short-term approaches. Conclusion The opportunity and need to use ART investments for an essential supply chain management and strengthened health system has not been exploited. By applying a systems perspective this work indicates the seriousness of missing system prerequisites. The findings suggest that root causes and capacities across the system have to be addressed synergistically to enable systems that can match and accommodate investments in disease-specific interventions. The multiplicity and complexity of existing challenges require a long-term and systems perspective essentially in contrast to the current short term and program-specific nature of external assistance. PMID:21806826

  10. Aquaculture: Incorporating risk assessment and risk management into public policies on genetically modified finfish and shellfish

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hallerman, E.M.; Kapuscinski, A.R.

    Genetically modified finfish and shellfish pose economic benefits to aquaculture, but also pose ecological and genetic risks to ecosystems receiving such organisms. Realization of benefits with minimization of risks posed by a new technology can be addressed through the processes of risk assessment and risk management. Public policies adopted by individual countries will reflect differences in the outocme of risk assessment and risk management processes resulting from differences among the receiving ecosystems and sets of human values at issue. A number of countries and international institutions have begun development of policies for oversight of genetically modified aquatic organisms. In themore » United States, a working group commissioned by the U.S. Department of Agriculture incorporated risk assessment and risk management principles into draft performance standards for safely conducting research with genetically modified finfish and shellfish. The performance standards address research with a broad range of aquatic GMO`s and compliance is intended to be voluntary. In contrast, the Canadian policy mandates adherence to specified guidelines for experiments with transgenic aquatic organisms; establishment as national policy is expended soon.« less

  11. Understanding cultural issues in the diabetes self-management behaviors of Korean immigrants.

    PubMed

    Cha, EunSeok; Yang, Kyeongra; Lee, Jia; Min, Jiwon; Kim, Kevin H; Dunbar, Sandra B; Jennings, Bonnie Mowinski

    2012-01-01

    The purpose of this study was to explore potential factors affecting the self-management behaviors of Korean immigrants with type 2 diabetes mellitus (KIT2Ds). A qualitative descriptive design guided this study. Semistructured interviews lasting 45 to 60 minutes were conducted with 20 KIT2Ds in the participants' preferred language; in all cases, this was Korean. Each interview was audiotaped, transcribed, and analyzed using conventional content analysis. Data analysis was performed in two steps. The data written in Korean were initially analyzed by 3 bilingual researchers. A qualitative researcher then participated in the analysis to refine the findings for presentation to an English-speaking audience while staying true to the data and preserving the nuanced Korean meanings. The mean age of the sample was 64. 5 ± 11.6 years (9 men and 11 women). The mean years of staying in the United States and age at diabetes mellitus diagnosis were 23.6 ± 9.7 years and 52.5 ± 12.3 years, respectively. Three major ideas were identified: (1) issues on treatment regimen related to medications and diet, (2) resources that helped or hindered ability to manage diabetes, and (3) the physician-patient relationship. Important cultural nuances need to be addressed to better prepare KIT2Ds to manage their diabetes more effectively. A culture-specific program should extend beyond a diabetes self-management education delivered in Korean language. Rather, content and education methods need to consider acculturation effects on diabetes management behaviors.

  12. What principles should govern the use of managed entry agreements?

    PubMed

    Klemp, Marianne; Frønsdal, Katrine B; Facey, Karen

    2011-01-01

    To ensure rapid access to new potentially beneficial health technologies, obtain best value for money, and ensure affordability, healthcare payers are adopting a range of innovative reimbursement approaches that may be called Managed Entry Agreements (MEAs). The Health Technology Assessment International (HTAi) Policy Forum sought to identify why MEAs might be used, issues associated with implementation and develop principles for their use. A 2-day deliberative workshop discussed key papers, members' experiences, and collectively addressed four policy questions that resulted in this study. MEAs are used to give access to new technologies where traditional reimbursement is deemed inappropriate. Three different forms of MEAs have been identified: management of budget impact, management of uncertainty relating to clinical and/or cost-effectiveness, and management of utilization to optimize performance. The rationale for using these approaches and their advantages and disadvantages differ. However, all forms of MEA should take the form of a formal written agreement among stakeholders, clearly identifying the rationale for the agreement, aspects to be assessed, methods of data collection and review, and the criteria for ending the agreement. MEAs should only be used when HTA identifies issues or concerns about key outcomes and/or costs and/or organizational/budget impacts that are material to a reimbursement decision. They provide patient access and can be useful to manage technology diffusion and optimize use. However, they are administratively complex and may be difficult to negotiate and their effectiveness has yet to be evaluated.

  13. Issues Management Process Course # 38401

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Binion, Ula Marie

    The purpose of this training it to advise Issues Management Coordinators (IMCs) on the revised Contractor Assurance System (CAS) Issues Management (IM) process. Terminal Objectives: Understand the Laboratory’s IM process; Understand your role in the Laboratory’s IM process. Learning Objectives: Describe the IM process within the context of the CAS; Describe the importance of implementing an institutional IM process at LANL; Describe the process flow for the Laboratory’s IM process; Apply the definition of an issue; Use available resources to determine initial screening risk levels for issues; Describe the required major process steps for each risk level; Describe the personnelmore » responsibilities for IM process implementation; Access available resources to support IM process implementation.« less

  14. Review of Issues Associated with Safe Operation and Management of the Space Shuttle Program

    NASA Technical Reports Server (NTRS)

    Johnstone, Paul M.; Blomberg, Richard D.; Gleghorn, George J.; Krone, Norris J.; Voltz, Richard A.; Dunn, Robert F.; Donlan, Charles J.; Kauderer, Bernard M.; Brill, Yvonne C.; Englar, Kenneth G.; hide

    1996-01-01

    At the request of the President of the United States through the Office of Science and Technology Policy (OSTP), the NASA Administrator tasked the Aerospace Safety Advisory Panel with the responsibility to identify and review issues associated with the safe operation and management of the Space Shuttle program arising from ongoing efforts to improve and streamline operations. These efforts include the consolidation of operations under a single Space Flight Operations Contract (SFOC), downsizing the Space Shuttle workforce and reducing costs of operations and management. The Panel formed five teams to address the potentially significant safety impacts of the seven specific topic areas listed in the study Terms of Reference. These areas were (in the order in which they are presented in this report): Maintenance of independent safety oversight; implementation plan for the transition of Shuttle program management to the Lead Center; communications among NASA Centers and Headquarters; transition plan for downsizing to anticipated workforce levels; implementation of a phased transition to a prime contractor for operations; Shuttle flight rate for Space Station assembly; and planned safety and performance upgrades for Space Station assembly. The study teams collected information through briefings, interviews, telephone conversations and from reviewing applicable documentation. These inputs were distilled by each team into observations and recommendations which were then reviewed by the entire Panel.

  15. CKD screening and management in the Veterans Health Administration: the impact of system organization and an innovative electronic record.

    PubMed

    Patel, Thakor G; Pogach, Leonard M; Barth, Robert H

    2009-03-01

    At the beginning of this decade, Healthy People 2010 issued a series of objectives to "reduce the incidence, morbidity, mortality and health care costs of chronic kidney disease." A necessary feature of any program to reduce the burden of kidney disease in the US population must include mechanisms to screen populations at risk and institute early the aspects of management, such as control of blood pressure, management of diabetes, and, in patients with advanced chronic kidney disease (CKD), preparation for dialysis therapy and proper vascular access management, that can retard CKD progression and improve long-term outcome. The Department of Veterans Affairs and the Veterans Health Administration is a broad-based national health care system that is almost uniquely situated to address these issues and has developed a number of effective approaches using evidence-based clinical practice guidelines, performance measures, innovative use of a robust electronic medical record system, and system oversight during the past decade. In this report, we describe the application of this systems approach to the prevention of CKD in veterans through the treatment of risk factors, identification of CKD in veterans, and oversight of predialysis and dialysis care. The lessons learned and applicability to the private sector are discussed.

  16. Situational Awareness Issues in the Implementation of Datalink: Shared Situational Awareness in the Joint Flight Deck-ATC Aviation System

    NASA Technical Reports Server (NTRS)

    Hansman, Robert John, Jr.

    1999-01-01

    MIT has investigated Situational Awareness issues relating to the implementation of Datalink in the Air Traffic Control environment for a number of years under this grant activity. This work has investigated: 1) The Effect of "Party Line" Information. 2) The Effect of Datalink-Enabled Automated Flight Management Systems (FMS) on Flight Crew Situational Awareness. 3) The Effect of Cockpit Display of Traffic Information (CDTI) on Situational Awareness During Close Parallel Approaches. 4) Analysis of Flight Path Management Functions in Current and Future ATM Environments. 5) Human Performance Models in Advanced ATC Automation: Flight Crew and Air Traffic Controllers. 6) CDTI of Datalink-Based Intent Information in Advanced ATC Environments. 7) Shared Situational Awareness between the Flight Deck and ATC in Datalink-Enabled Environments. 8) Analysis of Pilot and Controller Shared SA Requirements & Issues. 9) Development of Robust Scenario Generation and Distributed Simulation Techniques for Flight Deck ATC Simulation. 10) Methods of Testing Situation Awareness Using Testable Response Techniques. The work is detailed in specific technical reports that are listed in the following bibliography, and are attached as an appendix to the master final technical report.

  17. Implementing Reliability Centered Maintenance (RCM) with State of the Art PT&I Technologies

    NASA Technical Reports Server (NTRS)

    Hollis, Sean; Sasser, Chase

    2016-01-01

    Building on the work that was started two decades ago, Jacobs Space Operations Group has utilized state of the art PTI technologies to assess the current condition of the assets they manage under the Test and Operations Support Contract (TOSC). Specifically, the Asset Management department leveraged the benefits of ultrasound technology to quantify a motor issue in the Liquid Oxygen Storage Area, and troubleshoot the sources prior to loading the tank to perform Verification and Validation (VV) activities. This technology was efficient, easy to implement, and provided system engineers with data on a possible source of the problem. In situations where legacy motors are exhibiting unexpected noises, it may seem easier to remove and refurbish the motor and replace the bearings because that solution resolves most of the common causes of the noise. However, that solution would have involved additional spending and may not have solved issues stemming from the foundation, if those existed. By utilizing the ultrasound equipment provided by UE Systems, the sound profiles allowed Jacobs TOSC team to determine that the issue resembled a faulty bearing. After replacing the bearing, the unexpected noise ceased.

  18. Air Traffic Management Technology Demostration: 1 Research and Procedural Testing of Routes

    NASA Technical Reports Server (NTRS)

    Wilson, Sara R.; Kibler, Jennifer L.; Hubbs, Clay E.; Smail, James W.

    2015-01-01

    NASA's Air Traffic Management Technology Demonstration-1 (ATD-1) will operationally demonstrate the feasibility of efficient arrival operations combining ground-based and airborne NASA technologies. The ATD-1 integrated system consists of the Traffic Management Advisor with Terminal Metering which generates precise time-based schedules to the runway and merge points; Controller Managed Spacing decision support tools which provide controllers with speed advisories and other information needed to meet the schedule; and Flight deck-based Interval Management avionics and procedures which allow flight crews to adjust their speed to achieve precise relative spacing. Initial studies identified air-ground challenges related to the integration of these three scheduling and spacing technologies, and NASA's airborne spacing algorithm was modified to address some of these challenges. The Research and Procedural Testing of Routes human-in-the-loop experiment was then conducted to assess the performance of the new spacing algorithm. The results of this experiment indicate that the algorithm performed as designed, and the pilot participants found the airborne spacing concept, air-ground procedures, and crew interface to be acceptable. However, the researchers concluded that the data revealed issues with the frequency of speed changes and speed reversals.

  19. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GRYGIEL, M.L.

    1998-10-08

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less

  20. Public health response to striking solid waste management.

    PubMed

    Murti, Michelle; Ayre, Reg; Shapiro, Howard; de Burger, Ron

    2011-10-01

    In 2009, the City of Toronto, Ontario, Canada, experienced a six-week labor disruption involving 24,000 city workers that included solid waste and public health employees. In an attempt to control illegal dumping and to manage garbage storage across the city during this period, 24 temporary garbage storage sites were established by the city (mostly in local parks) for residents to dispose of their household waste. No other municipality in North America has attempted to operate this many temporary sites for this long a period. Management and nonunion staff from Healthy Environments in Toronto Public Health performed daily inspections, responded to community questions, issued public health orders, and worked closely with Solid Waste Management and the Ministry of the Environment to actively manage the public health concerns associated with these sites. This intensive oversight mitigated public health risks to the community and facilitated an effective, safe solution to the temporary garbage storage problem.

  1. Building America

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brad Oberg

    2010-12-31

    Builders generally use a 'spec and purchase' business management system (BMS) when implementing energy efficiency. A BMS is the overall operational and organizational systems and strategies that a builder uses to set up and run its company. This type of BMS treats building performance as a simple technology swap (e.g. a tank water heater to a tankless water heater) and typically compartmentalizes energy efficiency within one or two groups in the organization (e.g. purchasing and construction). While certain tools, such as details, checklists, and scopes of work, can assist builders in managing the quality of the construction of higher performancemore » homes, they do nothing to address the underlying operational strategies and issues related to change management that builders face when they make high performance homes a core part of their mission. To achieve the systems integration necessary for attaining 40% + levels of energy efficiency, while capturing the cost tradeoffs, builders must use a 'systems approach' BMS, rather than a 'spec and purchase' BMS. The following attributes are inherent in a systems approach BMS; they are also generally seen in quality management systems (QMS), such as the National Housing Quality Certification program: Cultural and corporate alignment, Clear intent for quality and performance, Increased collaboration across internal and external teams, Better communication practices and systems, Disciplined approach to quality control, Measurement and verification of performance, Continuous feedback and improvement, and Whole house integrated design and specification.« less

  2. Twenty years of research on water management issues in the Danube Macro-region - past developments and future directions.

    PubMed

    Feldbacher, Eva; Paun, Mihaela; Reckendorfer, Walter; Sidoroff, Manuela; Stanica, Adrian; Strimbu, Bogdan; Tusa, Iris; Vulturescu, Viorel; Hein, Thomas

    2016-12-01

    The Danube River-Danube Delta-Black Sea (DBS) region has witnessed major political, social and economic changes during the past three decades, which have profoundly affected the riverine, coastal and marine systems, their water management situation and the development of related research programmes. We reviewed the research activities in the DBS system of the past twenty years to determine the main funding bodies and to assess key research areas and how they varied over time and geographic region. As data basis we used a metadatabase filled with 478 projects addressing environmental and water management issues in the Danube River Basin, covering also the Danube Delta and the north-western Black Sea. As overall outcome extensive research efforts in the field of water management could be proven for the past two decades, despite the tumultuous times of political and economic transformations. One of the main findings was that EU funded projects played a key role for the development of transboundary research collaboration and were also the scientifically most productive one's. Historically, nutrient pollution was the main problem addressed, shifting to pollution in a broader sense and hydromorphological alterations in recent years. The newly arising challenges of climate change impacts and sediment management became important research questions in the last years, too. Most research was performed in the thematic field of navigation, followed by restoration and biodiversity issues. To meet all of the already identified and newly emerging challenges in the DBS System, cross-border and integrated (river-delta-sea) research activities are of major importance and have to be further promoted. We thus suggest drawing up a regional DBS Research Agenda linked to key challenges in water management to strengthen research collaboration and advance targeted scientific projects, an approach fostering also the scientific capacity in the region. Copyright © 2015 Elsevier B.V. All rights reserved.

  3. Decision-making process related to treatment and management in Korean women with breast cancer: Finding the right individualized healthcare trajectory.

    PubMed

    Kim, Kkotbong; Yang, Jinhyang

    2017-06-01

    After being diagnosed with breast cancer, women must make a number of decisions about their treatment and management. When the decision-making process among breast cancer patients is ineffective, it results in harm to their health. Little is known about the decision-making process of breast cancer patients during the entire course of treatment and management. We investigated women with breast cancer to explore the decision-making processes related to treatment and management. Eleven women participated, all of whom were receiving treatment or management in Korea. The average participant age was 43.5years. For data collection and analysis, a grounded theory methodology was used. Through constant comparative analyses, a core category emerged that we referred to as "finding the right individualized healthcare trajectory." The decision-making process occurred in four phases: turmoil, exploration, balance, and control. The turmoil phase included weighing the credibility of information and lowering the anxiety level. The exploration phase included assessing the expertise/promptness of medical treatment and evaluating the effectiveness of follow-up management. The balance phase included performing analyses from multiple angles and rediscovering value as a human being. The control phase included constructing an individualized management system and following prescribed and other management options. It is important to provide patients with accurate information related to the treatment and management of breast cancer so that they can make effective decisions. Healthcare providers should engage with patients on issues related to their disease, understand the burden placed on patients because of issues related to their sex, and ensure that the patient has a sufficient support system. The results of this study can be used to develop phase-specific, patient-centered, and tailored interventions for breast cancer patients. Copyright © 2017 Elsevier Inc. All rights reserved.

  4. Bibliography of Lewis Research Center technical publications announced in 1992

    NASA Technical Reports Server (NTRS)

    1993-01-01

    This compilation of abstracts describes and indexes the technical reporting that resulted from the scientific and engineering work performed and managed by the Lewis Research Center in 1992. All the publications were announced in the 1992 issues of STAR (Scientific and Technical Aerospace Reports) and/or IAA (International Aerospace Abstracts). Included are research reports, journal articles, conference presentations, patents and patent applications, and theses.

  5. Bibliography of Lewis Research Center Technical Publications announced in 1991

    NASA Technical Reports Server (NTRS)

    1992-01-01

    This compilation of abstracts describes and indexes the technical reporting that resulted from the scientific engineering work performed and managed by the Lewis Research Center in 1991. All the publications were announced in the 1991 issues of STAR (Scientific and Technical Aerospace Reports) and/or IAA (International Aerospace Abstracts). Included are research reports, journal articles, conference presentations, patents and patent applications, and theses.

  6. Bibliography of Lewis Research Center technical publications announced in 1993

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This compilation of abstracts describes and indexes the technical reporting that resulted from the scientific and engineering work performed and managed by the Lewis Research Center in 1993. All the publications were announced in the 1993 issues of STAR (Scientific and Technical Aerospace Reports) and/or IAA (International Aerospace Abstracts). Included are research reports, journal articles, conference presentations, patents and patent applications, and theses.

  7. Strategic Planning, Assessment and Accountability: Their Impact on the Establishment of Centers of Excellence in Academic Departments. AIR 1998 Annual Forum Paper.

    ERIC Educational Resources Information Center

    Pollicino, Elizabeth B.; Hall, Clover W.

    This paper reviews the literature on academic quality programs and examines issues faced at one institution in which two initiatives emphasizing student outcomes and faculty performance as indicators of quality are underway. In its review of the literature the paper focuses on concepts such as total quality management, peer or student evaluation…

  8. Bibliography of Lewis Research Center technical publications announced in 1990

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This compilation of abstracts describes and indexes the technical reporting that resulted from the scientific and engineering work performed and managed by the Lewis Research Center in 1990. All the publications were announced in the 1990 issues of STAR (Scientific and Technical Aerospace Reports) and/or IAA (International Aerospace Abstracts). Included are research reports, journal articles, conference presentations, patents and patent applications, and theses.

  9. Who Would Propel Post-Communist Universities--The Challenge of Motivation

    ERIC Educational Resources Information Center

    Keczer, Gabriella

    2010-01-01

    Motivation is an outstanding priority of human resource management. A person is motivated to make efforts and perform by the desire to satisfy his needs. So when we deal with the issue of motivation at the workplace, the first thing we have to learn is what needs employees may have, and we also have to check which of these needs the workplace/job…

  10. Bibliography of Lewis Research Center technical publications announced in 1977

    NASA Technical Reports Server (NTRS)

    1978-01-01

    This compilation of abstracts describes and indexes over 780 technical reports resulting from the scientific and engineering work performed and managed by the Lewis Research Center in 1977. All the publications were announced in the 1977 issues of STAR (Scientific and Technical Aerospace Reports) and/or IAA (International Aerospace Abstracts). Documents cited include research reports, journal articles, conference presentations, patents and patent applications, and theses.

  11. Leadership for Student Learning: Reinventing the Principalship. School Leadership for the 21st Century Initiative: A Report of the Task Force on the Principalship.

    ERIC Educational Resources Information Center

    Institute for Educational Leadership, Washington, DC.

    State and local education systems must abandon the century-old model of the principal as a middle manager directly responsible for every aspect of school operations and performance. Intense job stress, excessive time requirements, difficulty satisfying parents and community, social problems that make it difficult to focus on instructional issues,…

  12. Bibliography of Lewis Research Center technical publications announced in 1985

    NASA Technical Reports Server (NTRS)

    1986-01-01

    This compilation of abstracts describes and indexes the technical reporting that resulted from the scientific and engineering work performed and managed by the Lewis Research Center in 1985. All the publications were announced in the 1985 issues of STAR (Scientific and Technical Aerospace Reports) and/or IAA (International Aerospace Abstracts). Included are research reports, journal articles, conference presentations, patents and patent applications, and theses.

  13. Bibliography of Lewis Research Center technical publications announced in 1987

    NASA Technical Reports Server (NTRS)

    1988-01-01

    This compilation of abstracts describes and indexes the technical reporting that resulted from the scientific and engineering work performed and managed by the Lewis Research Center in 1987. All the publications were announced in the 1987 issues of STAR (Scientific and Technical Aerospace Reports) and/or IAA (International Aerospace Abstracts). Included are research reports, journal articles, conference presentations, patents and patent applications, and theses.

  14. Bibliography of Lewis Research Center technical publications announced in 1989

    NASA Technical Reports Server (NTRS)

    1990-01-01

    This compilation of abstracts describes and indexes the technical reporting that resulted from the scientific and engineering work performed and managed by the Lewis Research Center in 1989. All the publications were announced in the 1989 issues of STAR (Scientific and Technical Aerospace Reports) and/or IAA (International Aerospace Abstracts). Included are research reports, journal articles, conference presentations, patents and patent applications, and theses.

  15. Bibliography of Lewis Research Center technical publications announced in 1983

    NASA Technical Reports Server (NTRS)

    1984-01-01

    This compilation of abstracts describes and indexes over 800 technical publications that resulted from the scientific and engineering work performed and managed by the Lewis Research Center in 1983. Announced in the 1983 issues of STAR (Scientific and Technical Aerospace Reports) and/or IAA (International Aerospace Abstracts), the documents cited include research reports, journal articles, conference presentations, patents and patent applications, and theses.

  16. Bibliography of Lewis Research Center technical publications announced in 1984

    NASA Technical Reports Server (NTRS)

    1985-01-01

    This compilation of abstracts describes and indexes the technical reporting that resulted from the scientific and engineering work performed and managed by the Lewis Research Center in 1984. All the publications were announced in the 1984 issues of STAR (Scientific and Technical Aerospace Reports) and/or IAA (International Aerospace Abstracts). Included are research reports, journal articles, conference presentations, patents and patent applications, and theses.

  17. Bibliography of Lewis Research Center technical publications announced in 1986

    NASA Technical Reports Server (NTRS)

    1987-01-01

    This compilation of abstracts describes and indexes the technical reporting that resulted from the scientific and engineering work performed and managed by the Lewis Research Center in 1986. All the publications were announced in the 1986 issues of Scientific and Technical Aerospace Reports (STAR) and/or International Aerospace Abstracts (IAA). Included are research reports, journal articles, conference presentations, patents and patent applications, and theses.

  18. DOD Business Systems Modernization: Further Actions Needed to Address Challenges and Improve Accountability

    DTIC Science & Technology

    2013-05-01

    to Lack Adequate Validation Page 35 GAO-13-557 DOD Business Systems Modernization provided a compliance dashboard to document BEA...campaigns, execute marketing campaigns, and measure and evaluate the performance of marketing campaigns. Order-to- Cash Accept and process customer... dashboards reflected related GAO reports. In addition, the department’s fiscal year 2014 investment management guidance issued by the Office of the

  19. Container Management During Desert Shield/Storm: An Analysis and Critique of Lessons Learned

    DTIC Science & Technology

    1993-04-15

    across the distribution spectrum.14 These issues were grouped into five major categories: Containerization and Packaging, Distribution Management , Automation...of containers is needed, according to TDAP. Distribution - Management issues. The Desert Shield experience identified three general distribution ...recommended the formation of a 19 Theater Distribution Management Center from the assets of the Movement Control Agency (MCA) and Material Management

  20. Research nurse manager perceptions about research activities performed by non-nurse clinical research coordinators.

    PubMed

    Jones, Carolynn Thomas; Hastings, Clare; Wilson, Lynda Law

    2015-01-01

    There has been limited research to document differences in roles between nurses and non-nurses who assume clinical research coordination and management roles. Several authors have suggested that there is no acknowledged guidance for the licensure requirements for research study coordinators and that some non-nurse research coordinators may be assuming roles that are outside of their legal scopes of practice. There is a need for further research on issues related to the delegation of clinical research activities to non-nurses. This study used nominal group process focus groups to identify perceptions of experienced research nurse managers at an academic health science center in the Southern United States about the clinical research activities that are being performed by non-nurse clinical research coordinators without supervision that they believed should only be performed by a nurse or under the supervision of a nurse. A total of 13 research nurse managers volunteered to be contacted about the study. Of those, 8 participated in two separate nominal group process focus group sessions. The group members initially identified 22 activities that they felt should only be performed by a nurse or under the direct supervision of a nurse. After discussion and clarification of results, activities were combined into 12 categories of clinical research activities that participants believed should only be performed by a nurse or under the direct supervision of a nurse. Copyright © 2015 Elsevier Inc. All rights reserved.

  1. ERCMExpress. Volume 3, Issue 2

    ERIC Educational Resources Information Center

    Schonfeld, David J.

    2007-01-01

    The Emergency Response and Crisis Management (ERCM) Technical Assistance Center's newsletter, "ERCMExpress," provides comprehensive information on key issues in school emergency management. This issue of "ERCMExpress," titled "Coping with the Death of a Student or Staff Member," highlights the range of impact death can have on a school community;…

  2. Road safety issues for bus transport management.

    PubMed

    Cafiso, Salvatore; Di Graziano, Alessandro; Pappalardo, Giuseppina

    2013-11-01

    Because of the low percentage of crashes involving buses and the assumption that public transport improves road safety by reducing vehicular traffic, public interest in bus safety is not as great as that in the safety of other types of vehicles. It is possible that less attention is paid to the significance of crashes involving buses because the safety level of bus systems is considered to be adequate. The purpose of this study was to evaluate the knowledge and perceptions of bus managers with respect to safety issues and the potential effectiveness of various technologies in achieving higher safety standards. Bus managers were asked to give their opinions on safety issues related to drivers (training, skills, performance evaluation and behaviour), vehicles (maintenance and advanced devices) and roads (road and traffic safety issues) in response to a research survey. Kendall's algorithm was used to evaluate the level of concordance. The results showed that the majority of the proposed items were considered to have great potential for improving bus safety. The data indicated that in the experience of the participants, passenger unloading and pedestrians crossing near bus stops are the most dangerous actions with respect to vulnerable users. The final results of the investigation showed that start inhibition, automatic door opening, and the materials and internal architecture of buses were considered the items most strongly related to bus passenger safety. Brake assistance and vehicle monitoring systems were also considered to be very effective. With the exception of driver assistance systems for passenger and pedestrian safety, the perceptions of the importance of other driver assistance systems for vehicle monitoring and bus safety were not unanimous among the bus company managers who participated in this survey. The study results showed that the introduction of new technologies is perceived as an important factor in improving bus safety, but a better understanding of their actual effectiveness and related risk factor avoidance must be developed to permit their useful implementation in bus fleets. Copyright © 2013 Elsevier Ltd. All rights reserved.

  3. Pediatric issues in disaster management, Part 1: the emergency medical system and surge capacity.

    PubMed

    Mace, Sharon E; Sharieff, Ghazala; Bern, Andrew; Benjamin, Lee; Burbulys, Dave; Johnson, Ramon; Schreiber, Merritt

    2010-01-01

    Although children and infants are likely to be victims in a disaster and are more vulnerable in a disaster than adults, disaster planning and management has often overlooked the specific needs of pediatric patients. The authors discuss key components of disaster planning and management for pediatric patients, including emergency medical services, hospital/facility issues, evacuation centers, family separation/reunification, children with special healthcare needs (SHCNs), mental health issues, and overcrowding/surge capacity. Specific policy recommendations and an appendix with detailed practical information and algorithms are included. The first part of this three-part series on pediatric issues in disaster management addresses the emergency medical system from the field to the hospital and surge capacity including the impact of crowding. The second part addresses the appropriate setup and functioning of evacuation centers and family separation and reunification. The third part deals with special patient populations: children with SHCNs and mental health issues.

  4. Improved Management of the Technical Interfaces Between the Hanford Tank Farm Operator and the Hanford Waste Treatment Plant - 13383

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Duncan, Garth M.; Saunders, Scott A.

    2013-07-01

    The Department of Energy (DOE) is constructing the Waste Treatment and Immobilization Plant (WTP) at the Hanford site in Washington to treat and immobilize approximately 114 million gallons of high level radioactive waste (after all retrievals are accomplished). In order for the WTP to be designed and operated successfully, close coordination between the WTP engineering, procurement, and construction contractor, Bechtel National, Inc. and the tank farms operating contractor (TOC), Washington River Protection Solutions, LLC, is necessary. To develop optimal solutions for DOE and for the treatment of the waste, it is important to deal with the fact that two differentmore » prime contractors, with somewhat differing contracts, are tasked with retrieving and delivering the waste and for treating and immobilizing that waste. The WTP and the TOC have over the years cooperated to manage the technical interface. To manage what is becoming a much more complicated interface as the WTP design progresses and new technical issues have been identified, an organizational change was made by WTP and TOC in November of 2011. This organizational change created a co-located integrated project team (IPT) to deal with mutual and interface issues. The Technical Organization within the One System IPT includes employees from both TOC and WTP. This team has worked on a variety of technical issues of mutual interest and concern. Technical issues currently being addressed include: - The waste acceptance criteria; - Waste feed delivery and the associated data quality objectives (DQO); - Evaluation of the effects of performing a riser cut on a single shell tank on WTP operations; - The disposition of secondary waste from both TOC and WTP; - The close coordination of the TOC double shell tank mixing and sampling program and the Large Scale Integrated Test (LSIT) program for pulse jet mixers at WTP along with the associated responses to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2010-2; - Development of a set of alternatives to the current baseline that involve aspects of direct feed, feed conditioning, and design changes. The One System Technical Organization has served WTP, TOC, and DOE well in managing and resolving issues at the interface. This paper describes the organizational structure used to improve the interface and several examples of technical interface issues that have been successfully addressed by the new organization. (authors)« less

  5. EDITORIAL: Special issue on near surface geophysics for the study and the management of historical resources Special issue on near surface geophysics for the study and the management of historical resources

    NASA Astrophysics Data System (ADS)

    Eppelbaum, L. V.; Masini, N.; Soldovieri, F.

    2010-06-01

    This special issue of the Journal of Geophysics and Engineering hosts a selection of the papers that were presented at the session entitled `Near surface geophysics for the study and the management of historical resources: past, present and future', organized within the framework of the General Assembly of the European Geosciences Union (Vienna, Austria, 19-24 April 2009). As the conveners, we invited the active participants of this session to prepare papers reflecting their presentations and submit them for publication in the Journal of Geophysics and Engineering. This special issue presents the papers which have passed through the prolonged and stringent reviewing process. The papers presented in this issue illustrate the application of novel instrumentation, surface and airborne remote sensing techniques, as well as data processing oriented both to new archaeological targets characterization and cultural heritage conservation. In this field, increasing interest has been observed in recent years in non-destructive and non-invasive geophysical test methods. They allow one to overcome the subjectivity and ambiguity arising from the number and locations of the sites chosen to perform the destructive examination. In addition, very recently, much attention has been given to the integration of the classical geophysical techniques (GPR, magnetic, ERT, IP) with new emerging surface and subsurface sensing techniques (optical sensors, lidar, microwave tomography, MASW) for a combined monitoring of archaeological constructions and artefacts. We hope that the presented research papers will be interesting for readers in the different branches of environmental and cultural heritage sciences and will attract new potential contributors to the important topics of archaeological targets recognition, cultural heritage monitoring and diagnostics. Statistically, every day several tens of significant archaeological objects are destroyed and damaged throughout the Earth, and we hope that our investigation will help to decrease these losses. We wish to thank all the authors for their presentations and fruitful discussions at the session and for preparing these articles. We are grateful to all the reviewers whose accurate and hard work has made the successful publication of this special issue possible. We also thank the editors and managers of the Journal of Geophysics and Engineering (particularly Sarah Quin) for their skilled and pleasant collaboration.

  6. 78 FR 44590 - Notice of Public Meeting, Las Cruces District Resource Advisory Council Meeting, New Mexico

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ... Street, Las Cruces, NM, 88005, 575-525-4338. Persons who use a telecommunications device for the deaf... the BLM, on a variety of planning and management issues associated with public land management in New... Manager, updates on ongoing issues and planning efforts, presentation on the TriCounty Resource Management...

  7. 41 CFR 102-80.75 - Who assesses environmental issues in Federal construction and lease construction projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Who assesses environmental issues in Federal construction and lease construction projects? 102-80.75 Section 102-80.75 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 80-SAFETY...

  8. 41 CFR 102-74.515 - Will the affected person or organization and the Federal agency buildings manager have an...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... or organization and the Federal agency buildings manager have an opportunity to state their positions... and the Federal agency buildings manager have an opportunity to state their positions on the issues... manager will have an opportunity to state their positions on the issues, both verbally and in writing. ...

  9. Managing interoperability and complexity in health systems.

    PubMed

    Bouamrane, M-M; Tao, C; Sarkar, I N

    2015-01-01

    In recent years, we have witnessed substantial progress in the use of clinical informatics systems to support clinicians during episodes of care, manage specialised domain knowledge, perform complex clinical data analysis and improve the management of health organisations' resources. However, the vision of fully integrated health information eco-systems, which provide relevant information and useful knowledge at the point-of-care, remains elusive. This journal Focus Theme reviews some of the enduring challenges of interoperability and complexity in clinical informatics systems. Furthermore, a range of approaches are proposed in order to address, harness and resolve some of the many remaining issues towards a greater integration of health information systems and extraction of useful or new knowledge from heterogeneous electronic data repositories.

  10. Acoustic telemetry and fisheries management

    USGS Publications Warehouse

    Crossin, Glenn T.; Heupel, Michelle R.; Holbrook, Christopher; Hussey, Nigel E.; Lowerre-Barbieri, Susan K.; Nguyen, Vivian M.; Raby, Graham D.; Cooke, Steven J.

    2017-01-01

    This paper reviews the use of acoustic telemetry as a tool for addressing issues in fisheries management, and serves as the lead to the special Feature Issue of Ecological Applications titled “Acoustic Telemetry and Fisheries Management”. Specifically, we provide an overview of the ways in which acoustic telemetry can be used to inform issues central to the ecology, conservation, and management of exploited and/or imperiled fish species. Despite great strides in this area in recent years, there are comparatively few examples where data have been applied directly to influence fisheries management and policy. We review the literature on this issue, identify the strengths and weaknesses of work done to date, and highlight knowledge gaps and difficulties in applying empirical fish telemetry studies to fisheries policy and practice. We then highlight the key areas of management and policy addressed, as well as the challenges that needed to be overcome to do this. We conclude with a set of recommendations about how researchers can, in consultation with stock assessment scientists and managers, formulate testable scientific questions to address and design future studies to generate data that can be used in a meaningful way by fisheries management and conservation practitioners. We also urge the involvement of relevant stakeholders (managers, fishers, conservation societies, etc.) early on in the process (i.e. in the co-creation of research projects), so that all priority questions and issues can be addressed effectively.

  11. Sixth national stakeholder workshop summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    On June 17--18, 1998, the Department of Energy`s (DOE) Office of Worker and Community Transition convened its sixth National Stakeholder Workshop at the Ramada Plaza Hotel Old Town in Alexandria, Virginia. Approximately 325 stakeholders attended representing DOE headquarters and field offices, contractors, labor organizations, state and local government, education and community interest groups. The meeting addressed the progress made on the issues and challenges identified at the last stakeholder`s meeting in Oakland, California on April 9--11, 1997. Also discussed were the full range of the Department`s work force issues and creative solutions to the inherent challenges of simultaneously implementing themore » Department`s post Cold-War mission, work force restructuring guidance, contract reform objectives, asset disposition, performance-based management requirements, and business process improvement policies. The format of the Workshop included several plenary sessions and a number of small group discussion sessions. The small group sessions focused on topics related to labor issues, work force restructuring, work force planning, community transition, and employee concerns. The sessions provided a wide range of views on worker and community transition issues. The plenary sessions of the Workshop included presentations on the following topics: welcome and introductions; opening remarks; building a better labor-management relationship; keynote speech from Secretary of Energy Federico Pena; meeting tomorrow`s challenges (early site closures); harnessing the contracting process to encourage local growth; and, the British experience in economic conversion.« less

  12. New Automated System Available for Reporting Safety Concerns | Poster

    Cancer.gov

    A new system has been developed for reporting safety issues in the workplace. The Environment, Health, and Safety’s (EHS’) Safety Inspection and Issue Management System (SIIMS) is an online resource where any employee can report a problem or issue, said Siobhan Tierney, program manager at EHS.

  13. ERCMExpress. Volume 2, Issue 8

    ERIC Educational Resources Information Center

    US Department of Education, 2006

    2006-01-01

    This issue of ERCMExpress provides direction to schools and school districts in "Creating Emergency Management Plans." To ensure the safety of students, faculty and staff, schools and school districts nationwide should create comprehensive, multi-hazard emergency management plans that focus on the four phases of emergency management--…

  14. Managing Automation: A Process, Not a Project.

    ERIC Educational Resources Information Center

    Hoffmann, Ellen

    1988-01-01

    Discussion of issues in management of library automation includes: (1) hardware, including systems growth and contracts; (2) software changes, vendor relations, local systems, and microcomputer software; (3) item and authority databases; (4) automation and library staff, organizational structure, and managing change; and (5) environmental issues,…

  15. [Transferring palliative-care patients from hospital to community care: A qualitative study].

    PubMed

    Correa-Casado, Matías; Granero-Molina, José; Hernández-Padilla, José Manuel; Fernández-Sola, Cayetano

    To know the experience of case-manager nurses with regard to transferring palliative-care patients from the hospital to their homes. Qualitative phenomenological study carried out in 2014-2015. Poniente and Almería health districts, which referral hospitals are Poniente Hospital and Torrecárdenas Hospital, respectively. A purposive sample comprised of 12 case-manager nurses was recruited from the aforementioned setting. Theoretical data saturation was achieved after performing 7 in-depth individual interviews and 1 focus group. Data analysis was performed following Colaizzi's method. Three themes emerged: (1) 'Case-management nursing as a quality, patient-centred service' (2) 'Failures of the information systems', with the subthemes "patients" insufficient and inadequate previous information" and "ineffective between-levels communication channels for advanced nursing"; (3) 'Deficiencies in discharge planning', with the subthemes "deficient management of resources on admission", "uncertainty about discharge" and "insufficient human resources to coordinate the transfer". Case-manager nurses consider themselves a good-quality service. However, they think there are issues with coordination, information and discharge planning of palliative patients from hospital. It would be useful to review the communication pathways of both care and discharge reports, so that resources needed by palliative patients are effectively managed at the point of being transferred home. Copyright © 2016 Elsevier España, S.L.U. All rights reserved.

  16. Measurement issues in the evaluation of chronic disease self-management programs.

    PubMed

    Nolte, Sandra; Elsworth, Gerald R; Newman, Stanton; Osborne, Richard H

    2013-09-01

    To provide an in-depth analysis of outcome measures used in the evaluation of chronic disease self-management programs consistent with the Stanford curricula. Based on a systematic review on self-management programs, effect sizes derived from reported outcome measures are categorized according to the quality of life appraisal model developed by Schwartz and Rapkin which classifies outcomes from performance-based measures (e.g., clinical outcomes) to evaluation-based measures (e.g., emotional well-being). The majority of outcomes assessed in self-management trials are based on evaluation-based methods. Overall, effects on knowledge--the only performance-based measure observed in selected trials--are generally medium to large. In contrast, substantially more inconsistent results are found for both perception- and evaluation-based measures that mostly range between nil and small positive effects. Effectiveness of self-management interventions and resulting recommendations for health policy makers are most frequently derived from highly variable evaluation-based measures, that is, types of outcomes that potentially carry a substantial amount of measurement error and/or bias such as response shift. Therefore, decisions regarding the value and efficacy of chronic disease self-management programs need to be interpreted with care. More research, especially qualitative studies, is needed to unravel cognitive processes and the role of response shift bias in the measurement of change.

  17. Classified and clustered data constellation: An efficient approach of 3D urban data management

    NASA Astrophysics Data System (ADS)

    Azri, Suhaibah; Ujang, Uznir; Castro, Francesc Antón; Rahman, Alias Abdul; Mioc, Darka

    2016-03-01

    The growth of urban areas has resulted in massive urban datasets and difficulties handling and managing issues related to urban areas. Huge and massive datasets can degrade data retrieval and information analysis performance. In addition, the urban environment is very difficult to manage because it involves various types of data, such as multiple types of zoning themes in the case of urban mixed-use development. Thus, a special technique for efficient handling and management of urban data is necessary. This paper proposes a structure called Classified and Clustered Data Constellation (CCDC) for urban data management. CCDC operates on the basis of two filters: classification and clustering. To boost up the performance of information retrieval, CCDC offers a minimal percentage of overlap among nodes and coverage area to avoid repetitive data entry and multipath query. The results of tests conducted on several urban mixed-use development datasets using CCDC verify that it efficiently retrieves their semantic and spatial information. Further, comparisons conducted between CCDC and existing clustering and data constellation techniques, from the aspect of preservation of minimal overlap and coverage, confirm that the proposed structure is capable of preserving the minimum overlap and coverage area among nodes. Our overall results indicate that CCDC is efficient in handling and managing urban data, especially urban mixed-use development applications.

  18. The whole relationship between environmental variables and firm performance: competitive advantage and firm resources as mediator variables.

    PubMed

    López-Gamero, María D; Molina-Azorín, José F; Claver-Cortés, Enrique

    2009-07-01

    The examination of the possible direct link between environmental protection and firm performance in the literature has generally produced mixed results. The present paper contributes to the literature by using the resource-based view as a mediating process in this relationship. The study specifically tests whether or not the resource-based view of the firm mediates the positive relationships of proactive environmental management and improved environmental performance with competitive advantage, which also has consequences for financial performance. We also check the possible link between the adoption of a pioneering approach and good environmental management practices. Our findings support that early investment timing and intensity in environmental issues impact on the adoption of a proactive environmental management, which in turn helps to improve environmental performance. The findings also show that a firm's resources and competitive advantage act as mediator variables for a positive relationship between environmental protection and financial performance. This contribution is original because the present paper develops a comprehensive whole picture of this path process, which has previously only been partially discussed in the literature. In addition, this study clarifies a relevant point in the literature, namely that the effect of environmental protection on firm performance is not direct and can vary depending on the sector considered. Whereas competitive advantage in relation to costs influences financial performance in the IPPC law sector, the relevant influence in the hotel sector comes from competitive advantage through differentiation.

  19. Diabetes and end of life: ethical and methodological issues in gathering evidence to guide care.

    PubMed

    Dunning, Trisha; Duggan, Nicole; Savage, Sally; Martin, Peter

    2013-03-01

    Providing palliative care for people with diabetes at the end of life is part of the chronic disease care trajectory, but end of life care is complex and the presence of diabetes further complicates management. The aim of the paper is to discuss the ethical and methodological issues encountered when undertaking research to develop guidelines for managing diabetes at the end of life and the strategies used to address the issues. The issues emerged as we developed guidelines for managing diabetes at the end of life, which included conducting individual interviews with 14 people with diabetes requiring palliative care and 10 family members. A reflexive researcher journal was maintained throughout the guideline development process. The interview transcripts and researcher's journal were analysed to determine key methodological, ethical and researcher-related issues. Key themes were vulnerability of the sampling population, methodological issues included recruiting participants and ensuring rigor, ethical issues concerned benefit and risk, justice, autonomy, privacy, professional boundaries and informed consent. Researcher-related issues were identified such as managing participant distress and their own emotional distress. People were willing to discuss end of life diabetes management preferences. Undertaking research with people at the end of life is complex because of their vulnerability and the ethical issues involved. However, the ethical principles of autonomy and justice apply and people should be given the relevant information and opportunity to decide whether to participate or not. © 2012 The Authors. Scandinavian Journal of Caring Sciences © 2012 Nordic College of Caring Science.

  20. Human Systems Integration in Practice: Constellation Lessons Learned

    NASA Technical Reports Server (NTRS)

    Zumbado, Jennifer Rochlis

    2012-01-01

    NASA's Constellation program provided a unique testbed for Human Systems Integration (HSI) as a fundamental element of the Systems Engineering process. Constellation was the first major program to have HSI mandated by NASA's Human Rating document. Proper HSI is critical to the success of any project that relies on humans to function as operators, maintainers, or controllers of a system. HSI improves mission, system and human performance, significantly reduces lifecycle costs, lowers risk and minimizes re-design. Successful HSI begins with sufficient project schedule dedicated to the generation of human systems requirements, but is by no means solely a requirements management process. A top-down systems engineering process that recognizes throughout the organization, human factors as a technical discipline equal to traditional engineering disciplines with authority for the overall system. This partners with a bottoms-up mechanism for human-centered design and technical issue resolution. The Constellation Human Systems Integration Group (HSIG) was a part of the Systems Engineering and Integration (SE&I) organization within the program office, and existed alongside similar groups such as Flight Performance, Environments & Constraints, and Integrated Loads, Structures and Mechanisms. While the HSIG successfully managed, via influence leadership, a down-and-in Community of Practice to facilitate technical integration and issue resolution, it lacked parallel top-down authority to drive integrated design. This presentation will discuss how HSI was applied to Constellation, the lessons learned and best practices it revealed, and recommendations to future NASA program and project managers. This presentation will discuss how Human Systems Integration (HSI) was applied to NASA's Constellation program, the lessons learned and best practices it revealed, and recommendations to future NASA program and project managers on how to accomplish this critical function.

Top