Sample records for performance management plan

  1. 5 CFR 430.305 - Planning and communicating performance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... 430.305 Section 430.305 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERFORMANCE MANAGEMENT Managing Senior Executive Performance § 430.305 Planning and communicating... strategic planning initiatives. Critical elements and performance requirements for each senior executive...

  2. 5 CFR 430.305 - Planning and communicating performance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... 430.305 Section 430.305 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERFORMANCE MANAGEMENT Managing Senior Executive Performance § 430.305 Planning and communicating... strategic planning initiatives. Critical elements and performance requirements for each senior executive...

  3. Does performance management affect nurses' well-being?

    PubMed

    Decramer, Adelien; Audenaert, Mieke; Van Waeyenberg, Thomas; Claeys, Tine; Claes, Claudia; Vandevelde, Stijn; van Loon, Jos; Crucke, Saskia

    2015-04-01

    This article focuses on employee performance-management practices in the healthcare sector. We specifically aim to contribute to a better understanding of the impact of employee performance-management practices on affective well-being of nurses in hospitals. Theory suggests that the features of employee-performance management (planning and evaluation of individual performances) predict affective well-being (in this study: job satisfaction and affective commitment). Performance-management planning and evaluation and affective well-being were drawn from a survey of nurses at a Flemish hospital. Separate estimations were performed for different aspects of affective well-being. Performance planning has a negative effect on job satisfaction of nurses. Both vertical alignment and satisfaction with the employee performance-management system increase the affective well-being of nurses; however, the impact of vertical alignment differs for different aspects of affective well-being (i.e. job satisfaction and affective commitment). Performance-management planning and evaluation of nurses are associated with attitudinal outcomes. The results indicate that employee performance-management features have different impacts on different aspects of well-being. Copyright © 2014 Elsevier Ltd. All rights reserved.

  4. 40 CFR 60.2899 - What is a waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Preconstruction Siting Analysis Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...

  5. 40 CFR 60.2899 - What is a waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Preconstruction Siting Analysis Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...

  6. Performance measurement: A tool for program control

    NASA Technical Reports Server (NTRS)

    Abell, Nancy

    1994-01-01

    Performance measurement is a management tool for planning, monitoring, and controlling as aspects of program and project management--cost, schedule, and technical requirements. It is a means (concept and approach) to a desired end (effective program planning and control). To reach the desired end, however, performance measurement must be applied and used appropriately, with full knowledge and recognition of its power and of its limitations--what it can and cannot do for the project manager. What is the potential of this management tool? What does performance measurement do that a traditional plan vs. actual technique cannot do? Performance measurement provides an improvement over the customary comparison of how much money was spent (actual cost) vs. how much was planned to be spent based on a schedule of activities (work planned). This commonly used plan vs. actual comparison does not allow one to know from the numerical data if the actual cost incurred was for work intended to be done.

  7. 40 CFR 60.3010 - What is a waste management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for... Rule-Waste Management Plan § 60.3010 What is a waste management plan? A waste management plan is a...

  8. Wilmington Area Planning Council, New Castle County, Delaware and Cecil County, Maryland : a performance-based approach to integrating congestion management into the metropolitan planning process

    DOT National Transportation Integrated Search

    2009-04-01

    The Wilmington Area Planning Council takes an objectives-driven, performance-based approach to its metropolitan transportation planning, including paying special attention to integrating its Congestion Management Process into its planning efforts. Th...

  9. Forest Resource Management Plans: A Sustainability Approach

    ERIC Educational Resources Information Center

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  10. 40 CFR 60.2620 - What is a waste management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emissions Guidelines and Compliance Times for..., 1999 Model Rule-Waste Management Plan § 60.2620 What is a waste management plan? A waste management...

  11. Strategic planning by independent community pharmacies.

    PubMed

    Harrison, Donald L

    2005-01-01

    (1) To assess the degree and level of use of the strategic planning process (none, partly, fully) by independent community pharmacy owners/managers and (2) to evaluate the relationships between independent community pharmacy owners/managers' level of strategic planning and indicators of pharmacy performance; including new and refill prescriptions filled, gross margin, rated patient care performance, rated dispensing performance, rated non-pharmacy performance, and rated financial performance. Cross-sectional study. United States. Nationwide random sample of 1,250 owners/managers of independent community pharmacies. Mailed survey. Quality of strategic planning conducted; pharmacy performance measures. Only 141 of 527 (26.8%) usable responses indicated use of some (77 pharmacies, 54.6%) or all (64 pharmacies, 45.4%) of the seven steps typical of strategic planning. Significant associations were observed between the level of strategic planning use and all pharmacy performance variables assessed, including indicators such as greater numbers of new and refill prescriptions dispensed, gross margins, patient care performance, dispensing performance, non-pharmacy performance, and financial performance. Greater ratings of pharmacy performance were significantly associated with the level of strategic planning use. Respondents who fully used strategic planning had significantly higher indicators than partial users; respondents who partly used the process had significantly higher ratings than respondents who did not conduct strategic planning.

  12. Total Quality Management Implementation Plan.

    DTIC Science & Technology

    1989-06-01

    Quality Management Implementation Plan 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING ORGANIZATION Defense General...E 14. SUBJECT TERMS 15. NUMBER OF PAGES TOM (Total Quality Management ), Continuous Process Improvement,_________ Depot Operations, Supply Support 16

  13. DRMS (Defense Reutilization and Marketing Service) Total Quality Management (TQM) Implementation Plan

    DTIC Science & Technology

    1989-07-01

    FUNDING NUMBERS DRMS Total Quality Management (TQM) Implementation Plan 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING...OF PAGES TOM (Total Quality Management ), Continuous Process Improvement. ’f’ - Management 16. PRICE CODE 17. SECURITY CLASSIFICATION 18. SECURITY...7540-01-280-5500 Standard Form 298 (Rev. 2-89) Pr"cried by ANi SWt 139-i 296-101 DRMS TOTAL QUALITY MANAGEMENT (TQM) IMPLEMENTATION PLAN PURPOSE The

  14. 40 CFR 60.3011 - When must I submit my waste management plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false When must I submit my waste management... Model Rule-Waste Management Plan § 60.3011 When must I submit my waste management plan? You must submit a waste management plan no later than 60 days following the initial performance test as specified in...

  15. 40 CFR 60.3011 - When must I submit my waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false When must I submit my waste management... Model Rule-Waste Management Plan § 60.3011 When must I submit my waste management plan? You must submit a waste management plan no later than 60 days following the initial performance test as specified in...

  16. 40 CFR 60.3011 - When must I submit my waste management plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false When must I submit my waste management... Model Rule-Waste Management Plan § 60.3011 When must I submit my waste management plan? You must submit a waste management plan no later than 60 days following the initial performance test as specified in...

  17. 40 CFR 60.3011 - When must I submit my waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false When must I submit my waste management... Model Rule-Waste Management Plan § 60.3011 When must I submit my waste management plan? You must submit a waste management plan no later than 60 days following the initial performance test as specified in...

  18. 5 CFR 430.206 - Planning performance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Planning performance. 430.206 Section 430.206 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERFORMANCE MANAGEMENT Performance Appraisal for General Schedule, Prevailing Rate, and Certain Other Employees § 430.206...

  19. 5 CFR 430.206 - Planning performance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Planning performance. 430.206 Section 430.206 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERFORMANCE MANAGEMENT Performance Appraisal for General Schedule, Prevailing Rate, and Certain Other Employees § 430.206...

  20. 5 CFR 430.206 - Planning performance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 1 2011-01-01 2011-01-01 false Planning performance. 430.206 Section 430.206 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERFORMANCE MANAGEMENT Performance Appraisal for General Schedule, Prevailing Rate, and Certain Other Employees § 430.206...

  1. 5 CFR 430.206 - Planning performance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 1 2012-01-01 2012-01-01 false Planning performance. 430.206 Section 430.206 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERFORMANCE MANAGEMENT Performance Appraisal for General Schedule, Prevailing Rate, and Certain Other Employees § 430.206...

  2. Impact of Managerial Skills Learnt through MA Educational Planning Management Programme of AIOU on the Performance of Institutional Heads

    ERIC Educational Resources Information Center

    Chuadhry, Muhammad Asif; Shah, Syed Manzoor Hussain

    2012-01-01

    Management provides formal coordination in an organization for achieving pre-determined goals. The educational manager particulary performs his duties by using different planning and management techniques. These techniques are equally important for the manager of other sectors. The present study was focused on the impact of managerial skills…

  3. The influence of enterprise resource planning (ERP) systems' performance on earnings management

    NASA Astrophysics Data System (ADS)

    Tsai, Wen-Hsien; Lee, Kuen-Chang; Liu, Jau-Yang; Lin, Sin-Jin; Chou, Yu-Wei

    2012-11-01

    We analyse whether there is a linkage between performance measures of enterprise resource planning (ERP) systems and earnings management. We find that earnings management decreases with the higher performance of ERP systems. The empirical result is as expected. We further analyse how the dimension of the DeLone and McLean model of information systems success affects earnings management. We find that the relationship between the performance of ERP systems and earnings management depends on System Quality after ERP implementation. The more System Quality improves, the more earnings management is reduced.

  4. Health maintenance organization (HMO) performance and consumer complaints: an empirical study of frustrating HMO activities.

    PubMed

    Born, Patricia H; Query, J Tim

    2004-01-01

    Growing public interest in the operations of managed care plans has fueled a variety of activities to collect and analyze their performance. These activities include studies of financial performance, analysis of enrollment decisions, and, more recently, the development of systems for measuring healthcare quality to improve accountability to consumers. In this study, the authors focus on the activities of managed care plans that may frustrate patients and providers and, subsequently, motivate patients to file complaints. Using data from three sources, they evaluate the relationships between complaints against managed care plans and two metrics of performance: (a) the financial performance of the plan, and (b) the quality of care provided. Their findings indicate that complaints against health maintenance organizations are significantly related to the plans' levels of quality and to actions that may impede access to care.

  5. Dutch healthcare reform: did it result in performance improvement of health plans? A comparison of consumer experiences over time.

    PubMed

    Hendriks, Michelle; Spreeuwenberg, Peter; Rademakers, Jany; Delnoij, Diana M J

    2009-09-17

    Many countries have introduced elements of managed competition in their healthcare system with the aim to accomplish more efficient and demand-driven health care. Simultaneously, generating and reporting of comparative healthcare information has become an important quality-improvement instrument. We examined whether the introduction of managed competition in the Dutch healthcare system along with public reporting of quality information was associated with performance improvement in health plans. Experiences of consumers with their health plan were measured in four consecutive years (2005-2008) using the CQI(R) health plan instrument 'Experiences with Healthcare and Health Insurer'. Data were available of 13,819 respondents (response = 45%) of 30 health plans in 2005, of 8,266 respondents (response = 39%) of 32 health plans in 2006, of 8,088 respondents (response = 34%) of 32 health plans in 2007, and of 7,183 respondents (response = 31%) of 32 health plans in 2008. We performed multilevel regression analyses with three levels: respondent, health plan and year of measurement. Per year and per quality aspect, we estimated health plan means while adjusting for consumers' age, education and self-reported health status. We tested for linear and quadratic time effects using chi-squares. The overall performance of health plans increased significantly from 2005 to 2008 on four quality aspects. For three other aspects, we found that the overall performance first declined and then increased from 2006 to 2008, but the performance in 2008 was not better than in 2005. The overall performance of health plans did not improve more often for quality aspects that were identified as important areas of improvement in the first year of measurement. On six out of seven aspects, the performance of health plans that scored below average in 2005 increased more than the performance of health plans that scored average and/or above average in that year. We found mixed results concerning the effects of managed competition on the performance of health plans. To determine whether managed competition in the healthcare system leads to quality improvement in health plans, it is important to examine whether and for what reasons health plans initiate improvement efforts.

  6. Performance-based planning and programming guidebook.

    DOT National Transportation Integrated Search

    2013-09-01

    "Performance-based planning and programming (PBPP) refers to the application of performance management principles within the planning and programming processes of transportation agencies to achieve desired performance outcomes for the multimodal tran...

  7. Energy Management Lesson Plans for Vocational Agriculture Instructors.

    ERIC Educational Resources Information Center

    Hedges, Lowell E., Ed.; Miller, Larry E., Ed.

    This notebook provides vocational agricultural teachers with 10 detailed lesson plans on the major topic of energy management in agriculture. The lesson plans present information about energy and the need to manage it wisely, using a problem-solving approach. Each lesson plan follows this format: lesson topic, lesson performance objectives,…

  8. Aviation Human-in-the-Loop Simulation Studies: Experimental Planning, Design, and Data Management

    DTIC Science & Technology

    2014-01-01

    Aviation Human-in-the-Loop Simulation Studies: Experimental Planning, Design , and Data Management Kevin W. Williams1 Bonny Christopher2 Gena...Simulation Studies: Experimental Planning, Design , and Data Management January 2014 6. Performing Organization Code 7. Author(s) 8. Performing...describe the process by which we designed our human-in-the-loop (HITL) simulation study and the methodology used to collect and analyze the results

  9. 16 CFR 1000.19 - Office of Financial Management, Planning and Evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...; analysis of major policy and operational issues; performing evaluations and management studies of... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Office of Financial Management, Planning and... COMMISSION ORGANIZATION AND FUNCTIONS § 1000.19 Office of Financial Management, Planning and Evaluation. The...

  10. Assessing climate change-robustness of protected area management plans-The case of Germany.

    PubMed

    Geyer, Juliane; Kreft, Stefan; Jeltsch, Florian; Ibisch, Pierre L

    2017-01-01

    Protected areas are arguably the most important instrument of biodiversity conservation. To keep them fit under climate change, their management needs to be adapted to address related direct and indirect changes. In our study we focus on the adaptation of conservation management planning, evaluating management plans of 60 protected areas throughout Germany with regard to their climate change-robustness. First, climate change-robust conservation management was defined using 11 principles and 44 criteria, which followed an approach similar to sustainability standards. We then evaluated the performance of individual management plans concerning the climate change-robustness framework. We found that climate change-robustness of protected areas hardly exceeded 50 percent of the potential performance, with most plans ranking in the lower quarter. Most Natura 2000 protected areas, established under conservation legislation of the European Union, belong to the sites with especially poor performance, with lower values in smaller areas. In general, the individual principles showed very different rates of accordance with our principles, but similarly low intensity. Principles with generally higher performance values included holistic knowledge management, public accountability and acceptance as well as systemic and strategic coherence. Deficiencies were connected to dealing with the future and uncertainty. Lastly, we recommended the presented principles and criteria as essential guideposts that can be used as a checklist for working towards more climate change-robust planning.

  11. Analysis of Workplace Health Education Performed by Occupational Health Managers in Korea.

    PubMed

    Kim, Yeon-Ha; Jung, Moon-Hee

    2016-09-01

    To evaluate workplace health education as practiced by occupational health managers based on standardized job tasks and suggest priority tasks and areas to be trained. The study was conducted between November 10, 2013 and April 30, 2014. The tool used in this study was standardized job tasks of workplace health education for occupational health managers which was developed through methodological steps. It was evaluated by 233 worksite occupational health managers. Data were analyzed using SPSS 21.0. Predicting variables of workplace health education performance were the "analysis and planning" factor, type of enterprise, and form of management. Healthcare professionals and occupational health managers who managed the nonmanufacturing industry showed high importance and low performance level in "analysis and planning" factor. "Analysis and planning" skill is priority training area for healthcare professionals and occupational health managers who managed nonmanufacturing industry. It is necessary to develop a training curriculum for occupational health managers that include improving analysis of worksites and plans for a health education program. Copyright © 2016. Published by Elsevier B.V.

  12. Total Quality Management Implementation Plan: Defense Depot, Ogden

    DTIC Science & Technology

    1989-07-01

    NUMBERS Total Quality Management Implementation Plan Defense Depot Ogden 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING...PAGES TQM (Total Quality Management ), Continuous Process Improvement, Depot Operations, Process Action Teams 16. PRICE CODE 17. SECURITY...034 A Message From The Commander On Total Quality Management i fully support the DLA aoproacii to Total Quality Management . As stated by General

  13. 25 CFR 1200.16 - What criteria will be used in evaluating the management plan?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... performance record for funds management, and the ability to compensate the tribe if the entity is found liable for failing to comply with the tribe's management plan (i.e., its assets, bonding, and insurance). (b... complexity of the proposed management plan to determine whether the tribe has the experience to manage its...

  14. 25 CFR 1200.16 - What criteria will be used in evaluating the management plan?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... performance record for funds management, and the ability to compensate the tribe if the entity is found liable for failing to comply with the tribe's management plan (i.e., its assets, bonding, and insurance). (b... complexity of the proposed management plan to determine whether the tribe has the experience to manage its...

  15. Learning to manage a complex ecosystem: adaptive management and the Northwest Forest Plan.

    Treesearch

    George H. Stankey; Roger N. Clark; Bernard T. Bormann

    2006-01-01

    The Northwest Forest Plan (the Plan) identifies adaptive management as a central strategy for effective implementation. Despite this, there has been a lack of any systematic evaluation of its performance. This study is based on an extensive literature review, 50 interviews with resource managers and scientists involved with the Plan’s implementation, and a survey of...

  16. Virtual Team E-Leadership: The Effects of Leadership Style and Conflict Management Mode on the Online Learning Performance of Students in a Business-Planning Course

    ERIC Educational Resources Information Center

    Chang, Wen-Long; Lee, Chun-Yi

    2013-01-01

    The aim of this study was to investigate the influence of leadership style, whether transactional or transformational, and conflict management mode on the online learning performance of students in a business-planning course. Conflict management was performed using the following five approaches: (1) avoidance, (2) accommodation, (3) competition,…

  17. Performance planning for rural planning organizations - final report.

    DOT National Transportation Integrated Search

    2017-02-01

    Recent federal rules place increased emphasis on performance-based management of the multimodal : transportation system and require the use of performance based methods in state, metropolitan, and : non-metropolitan transportation planning and progra...

  18. Developing performance measures for alcohol and other drug services in managed care plans. Washington Circle Group.

    PubMed

    McCorry, F; Garnick, D W; Bartlett, J; Cotter, F; Chalk, M

    2000-11-01

    Monitoring the quality and availability of alcohol and other drug (AOD) services must be a central tenet of any health-related performance measurement system. The Washington Circle Group (WCG), which was convened by the Center for Substance Abuse Treatment Office of Managed Care in March 1998, has developed a core set of performance measures for AOD services for public- and private-sector health plans. It is also collaborating with a broad range of stakeholders to ensure widespread adoption of these performance measures by health plans, private employers, public payers, and accrediting organizations. Four domains were identified, with specific measures developed for each domain: (1) prevention/education, (2) recognition, (3) treatment (including initiation of alcohol and other plan services, linkage of detoxification and AOD plan services, treatment engagement, and interventions for family members/significant others), and (4) maintenance of treatment effects. Four measures that are based on administrative information from health plans and two measures that require a consumer survey of behavioral health care are undergoing extensive pilot testing. The WCG has reached out to a broad range of stakeholders in performance measurement and managed care to acquaint them with the measures and to promote their investigation and adoption. As results of pilot testing become available, these outreach efforts will continue. Performance measures for AOD services need to become an integral part of a comprehensive set of behavioral and physical health performance measures for managed care plans.

  19. CCSF Management Plan, 2002/2003.

    ERIC Educational Resources Information Center

    City Coll. of San Francisco, CA.

    This is the 2001-2002 management plan for the City College of San Francisco (CCSF), California. The plan contains the following sections: (1) Overview of Planning and Budgeting; (2) Vision, Values, and Mission; (3) College Goals and Strategic Priorities; (4) Annual Institutional Plan CCSF 2002-03; (5) College Core Performance Indicators; and (6)…

  20. Cost accounting, management control, and planning in health care.

    PubMed

    Siegrist, R B; Blish, C S

    1988-02-01

    Advantages and pharmacy applications of computerized hospital management-control and planning systems are described. Hospitals must define their product lines; patient cases, not tests or procedures, are the end product. Management involves operational control, management control, and strategic planning. Operational control deals with day-to-day management on the task level. Management control involves ensuring that managers use resources effectively and efficiently to accomplish the organization's objectives. Management control includes both control of unit costs of intermediate products, which are procedures and services used to treat patients and are managed by hospital department heads, and control of intermediate product use per case (managed by the clinician). Information from the operation and management levels feeds into the strategic plan; conversely, the management level controls the plan and the operational level carries it out. In the system developed at New England Medical Center, Boston, Massachusetts, the intermediate product-management system enables managers to identify intermediate products, develop standard costs, simulate changes in departmental costs, and perform variance analysis. The end-product management system creates a patient-level data-base, identifies end products (patient-care groupings), develops standard resource protocols, models alternative assumptions, performs variance analysis, and provides concurrent reporting. Examples are given of pharmacy managers' use of such systems to answer questions in the areas of product costing, product pricing, variance analysis, productivity monitoring, flexible budgeting, modeling and planning, and comparative analysis.(ABSTRACT TRUNCATED AT 250 WORDS)

  1. Assessing climate change-robustness of protected area management plans—The case of Germany

    PubMed Central

    Geyer, Juliane; Kreft, Stefan; Jeltsch, Florian; Ibisch, Pierre L.

    2017-01-01

    Protected areas are arguably the most important instrument of biodiversity conservation. To keep them fit under climate change, their management needs to be adapted to address related direct and indirect changes. In our study we focus on the adaptation of conservation management planning, evaluating management plans of 60 protected areas throughout Germany with regard to their climate change-robustness. First, climate change-robust conservation management was defined using 11 principles and 44 criteria, which followed an approach similar to sustainability standards. We then evaluated the performance of individual management plans concerning the climate change-robustness framework. We found that climate change-robustness of protected areas hardly exceeded 50 percent of the potential performance, with most plans ranking in the lower quarter. Most Natura 2000 protected areas, established under conservation legislation of the European Union, belong to the sites with especially poor performance, with lower values in smaller areas. In general, the individual principles showed very different rates of accordance with our principles, but similarly low intensity. Principles with generally higher performance values included holistic knowledge management, public accountability and acceptance as well as systemic and strategic coherence. Deficiencies were connected to dealing with the future and uncertainty. Lastly, we recommended the presented principles and criteria as essential guideposts that can be used as a checklist for working towards more climate change-robust planning. PMID:28982187

  2. Integrated corridor management initiative : demonstration phase evaluation – Dallas corridor performance analysis test plan.

    DOT National Transportation Integrated Search

    2012-08-01

    This report presents the test plan for conducting the Corridor Performance Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration. The ICM ...

  3. Integrated corridor management initiative : demonstration phase evaluation – San Diego corridor performance analysis test plan.

    DOT National Transportation Integrated Search

    2012-08-01

    This report presents the test plan for conducting the Corridor Performance Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM proje...

  4. Using School Performance Data to Drive School and Education District Office Accountability and Improvement: The Case of Ghana

    ERIC Educational Resources Information Center

    Prew, Martin; Quaigrain, Kenneth

    2010-01-01

    This article looks at a school management tool that allows school managers and education district offices to review the performance of their schools and use the broad-based data to undertake orchestrated planning with districts planning delivery based on the needs of schools and in support of school improvement plans. The review process also…

  5. 5 CFR 430.201 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERFORMANCE MANAGEMENT... performance appraisal systems and requires the Office of Personnel Management (OPM) to prescribe regulations... Management Plan approved by OPM as of September 22, 1995 shall constitute an approved performance appraisal...

  6. DPSC (Defense Personnel Support Center) Total Quality Management Master Plan

    DTIC Science & Technology

    1989-07-01

    SUBTITLE 5. FUNDING NUMBERS DPSC Total Quality Management Master Plan 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) B. PERFORMING...quality supported solider, sailor, airman and marine. % j cl 1 14. SUBJECT TERMS I 1S. NUMBER OF PAGES TQM (Total Quality Management ), Continuous...THE COMMANDER ON TOTAL QUALITY MANAGEMENT i SECTION I INTRODUCTION 1 II CONCEPTS 6 TQM Basics 7 Continuous Process Improvement 7 DoD TQM Philosophy 9

  7. Site planning and integration fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SCHULTZ, E.A.

    The primary mission of the Site Planning and Integration (SP and I) project is to assist Fluor Daniel Project Direction to ensure that all work performed under the Project Hanford Management Contract (PHMC) is adequately planned, executed, controlled, and that performance is measured and reported in an integrated fashion. Furthermore, SP and I is responsible for the development, implementation, and management of systems and processes that integrate technical, schedule, and cost baselines for PHMC work.

  8. 32 CFR 239.13 - Program Performance Reviews.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... will prepare monthly program performance reviews using the Homeowners Assistance Program Management Information System; HQUSACE Annual Management Command Plan and Management Control Checklist. In addition...

  9. The contributions of managed care plans to public health practice: evidence from the nation's largest local health departments.

    PubMed Central

    Mays, G. P.; Halverson, P. K.; Stevens, R.

    2001-01-01

    OBJECTIVE: The authors examine the extent and nature of managed care plans participating in local public health activities. METHODS: In 1998, the authors surveyed the directors of all US local health departments serving jurisdictions of at least 100,000 residents to collect information about public health activities performed in their jurisdictions and about organizations participating in the activities. Multivariate logistic and linear regression models were used to examine organizational and market characteristics associated with managed care plan participation in public health activities. RESULTS: Managed care plans were reported to participate in public health activities in 164 (46%) of the jurisdictions surveyed, and to contribute to 13% of the public health activities performed in the average jurisdiction. Plans appeared most likely to participate in public health activities involving the delivery or management of personal health services and the exchange of health-related information. Managed care participation was more likely to occur in jurisdictions with higher HMO penetration, fewer competing plans, and larger proportions of plans enrolling Medicaid recipients. Participation was positively associated with the overall scope and perceived effectiveness of local public health activities. CONCLUSIONS: Although plans participate in a narrow range of activities, these contributions may complement the work of public health agencies. PMID:11889275

  10. Strategic planning processes and hospital financial performance.

    PubMed

    Kaissi, Amer A; Begun, James W

    2008-01-01

    Many common management practices in healthcare organizations, including the practice of strategic planning, have not been subject to widespread assessment through empirical research. If management practice is to be evidence-based, evaluations of such common practices need to be undertaken. The purpose of this research is to provide evidence on the extent of strategic planning practices and the association between hospital strategic planning processes and financial performance. In 2006, we surveyed a sample of 138 chief executive officers (CEOs) of hospitals in the state of Texas about strategic planning in their organizations and collected financial information on the hospitals for 2003. Among the sample hospitals, 87 percent reported having a strategic plan, and most reported that they followed a variety of common practices recommended for strategic planning-having a comprehensive plan, involving physicians, involving the board, and implementing the plan. About one-half of the hospitals assigned responsibility for the plan to the CEO. We tested the association between these planning characteristics in 2006 and two measures of financial performance for 2003. Three dimensions of the strategic planning process--having a strategic plan, assigning the CEO responsibility for the plan, and involving the board--are positively associated with earlier financial performance. Further longitudinal studies are needed to evaluate the cause-and-effect relationship between planning and performance.

  11. Configuration Management Plan for the Tank Farm Contractor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    WEIR, W.R.

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less

  12. Implementing Total Quality Management in a University Setting.

    ERIC Educational Resources Information Center

    Coate, L. Edwin

    1991-01-01

    Oregon State University implemented Total Quality Management in nine phases: exploration; establishing a pilot study team; defining customer needs; adopting the breakthrough planning process; performing breakthrough planning in divisions; forming daily management teams; initiating cross-functional pilot projects; implementing cross-functional…

  13. NASA Performance Plan

    NASA Technical Reports Server (NTRS)

    1999-01-01

    The Government Performance and Results Act (GPRA) passed by Congress and signed by the President in 1993 provides a new tool to improve the efficiency of all Federal agencies. The goals of GPRA are to: Improve citizen confidence in Government performance; Improve Federal program management, effectiveness, and public accountability; and Improve congressional decisionmaking on where to commit the Nation's financial and human resources. The Act directs Executive Branch agencies to develop a customer-focused strategic plan that aligns activities with concrete missions and goals. The first plans were submitted in September 1998 as part of the Fiscal Year 1999 (FY99) budget process. These budget submissions were expected to support the goals expressed in the agency strategic plans. The Act also directs agencies to manage and measure results to justify congressional appropriations and authorizations. Six months after the completion of the fiscal year, agencies will report on the degree of success in achieving the goals and evaluation measures defined in the strategic and performance plans. The plans required by GPRA have been submitted to the Office of Management and Budget (OMB) and to Congress. Copies of NASA plans are available from the Office of Policy and Plans at NASA Headquarters and can be accessed on the i nterinet web sites identified in the Appendix.

  14. A concept for performance management for Federal science programs

    USGS Publications Warehouse

    Whalen, Kevin G.

    2017-11-06

    The demonstration of clear linkages between planning, funding, outcomes, and performance management has created unique challenges for U.S. Federal science programs. An approach is presented here that characterizes science program strategic objectives by one of five “activity types”: (1) knowledge discovery, (2) knowledge development and delivery, (3) science support, (4) inventory and monitoring, and (5) knowledge synthesis and assessment. The activity types relate to performance measurement tools for tracking outcomes of research funded under the objective. The result is a multi-time scale, integrated performance measure that tracks individual performance metrics synthetically while also measuring progress toward long-term outcomes. Tracking performance on individual metrics provides explicit linkages to root causes of potentially suboptimal performance and captures both internal and external program drivers, such as customer relations and science support for managers. Functionally connecting strategic planning objectives with performance measurement tools is a practical approach for publicly funded science agencies that links planning, outcomes, and performance management—an enterprise that has created unique challenges for public-sector research and development programs.

  15. Advancing metropolitan planning for operations : an objectives-driven, performance-based approach : a guidebook

    DOT National Transportation Integrated Search

    2010-02-01

    This guidebook presents an approach for integrating management and operations (M&O) strategies into the metropolitan transportation planning process that is designed to maximize the performance of the existing and planned transportation system. This ...

  16. Characteristics of health plans that treat psychiatric patients.

    PubMed

    Zarin, D A; West, J C; Pincus, H A; Tanielian, T L

    1999-01-01

    Nationally representative data regarding the organizational, financial, and procedural features of health plans in which psychiatric patients receive treatment indicate that fewer privately insured, Medicaid, and Medicare managed care enrollees receive care from a psychiatrist than is true for "nonmanaged" enrollees. Financial considerations were reported to adversely affect treatment for one-third of all patients. Although utilization management techniques and financial/resource constraints commonly applied to patients in both managed and nonmanaged plans, performance-based incentives were rare in nonmanaged plans. The traditional health plan categories provide limited information to identify salient plan characteristics and guide policy decisions regarding the provision of care.

  17. Tank waste remediation system configuration management implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    1998-03-31

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from themore » life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.« less

  18. A Strategic Plan for Introducing, Implementing, Managing, and Monitoring an Urban Extension Platform

    ERIC Educational Resources Information Center

    Warner, Laura A.; Vavrina, Charlie S.; Campbell, Mary L.; Elliott, Monica L.; Northrop, Robert J.; Place, Nick T.

    2017-01-01

    Florida's Strategic Plan for Extension in Metropolitan Regions reflects an adaptive management approach to the state's urban Extension mission within the context of establishing essential elements, performance indicators, key outcomes, and suggested alternatives for action. Extension leadership has adopted the strategic plan, and implementation…

  19. Responsibility for retirement planning shifts to employees.

    PubMed

    Van Gelder, N

    1994-08-01

    In recent years, organizations have shifted away from offering their employees defined benefit plans that promise specified income streams to employees when they retire. Instead, they are offering employees defined contribution plans, which rely on investment performance, as directed by plan participants, to generate sufficient retirement income. Healthcare financial managers who work in organizations that offer retirement plans for their employees find themselves increasingly prevailed upon to play the role of instructor to plan participants. While some financial managers may not relish the role, the more successful financial managers are at helping plan participants achieve their retirement income goals, the better the chance of healthcare organizations avoiding future liability problems.

  20. Defense Depot Mechanicsburg Total Quality Management Implementation Plan

    DTIC Science & Technology

    1989-06-01

    B T I TLEE 5 . FUNDING NUMBERS Defense Depot Mechanicsburg Total Quality Management Implementation Plan 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME...Form 298 (Rev. 2-89) L296- 102 Acces.ion For NYI J ... I:: ted DEFENSE DEPOT MECHANICSBURG PENNSYLVANIAL--I By_ TOTAL QUALITY MANAGEMENT K_~ t buty-n...IMPLEMENTATION PLAN Avmail-t!Ilty Codes IvLl c 2Dd/or JUN 3 0 1989 iDizt Special PURPOSE The purpose of this Total Quality Management Implementation

  1. FY 1987 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less

  2. 40 CFR 60.2620 - What is a waste management plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emissions Guidelines and Compliance Times for Commercial and Industrial Solid Waste Incineration Units Model Rule-Waste Management Plan § 60.2620 What is a...

  3. 40 CFR 60.2620 - What is a waste management plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emissions Guidelines and Compliance Times for Commercial and Industrial Solid Waste Incineration Units Model Rule-Waste Management Plan § 60.2620 What is a...

  4. New Jersey interagency emergency management plan.

    DOT National Transportation Integrated Search

    2005-09-01

    This report outlines the research and work performed to lay the foundation for the : development of a New Jersey Interagency Emergency Management Plan. The : research into existing practices within the four state level transportation agencies : revea...

  5. Drinking Water Management and Governance in Canada: An Innovative Plan-Do-Check-Act (PDCA) Framework for a Safe Drinking Water Supply

    NASA Astrophysics Data System (ADS)

    Bereskie, Ty; Rodriguez, Manuel J.; Sadiq, Rehan

    2017-08-01

    Drinking water management in Canada is complex, with a decentralized, three-tiered governance structure responsible for safe drinking water throughout the country. The current approach has been described as fragmented, leading to governance gaps, duplication of efforts, and an absence of accountability and enforcement. Although there have been no major waterborne disease outbreaks in Canada since 2001, a lack of performance improvement, especially in small drinking water systems, is evident. The World Health Organization water safety plan approach for drinking water management represents an alternative preventative management framework to the current conventional, reactive drinking water management strategies. This approach has seen successful implementation throughout the world and has the potential to address many of the issues with drinking water management in Canada. This paper presents a review and strengths-weaknesses-opportunities-threats analysis of drinking water management and governance in Canada at the federal, provincial/territorial, and municipal levels. Based on this analysis, a modified water safety plan (defined as the plan-do-check-act (PDCA)-WSP framework) is proposed, established from water safety plan recommendations and the principles of PDCA for continuous performance improvement. This proposed framework is designed to strengthen current drinking water management in Canada and is designed to fit within and incorporate the existing governance structure.

  6. Drinking Water Management and Governance in Canada: An Innovative Plan-Do-Check-Act (PDCA) Framework for a Safe Drinking Water Supply.

    PubMed

    Bereskie, Ty; Rodriguez, Manuel J; Sadiq, Rehan

    2017-08-01

    Drinking water management in Canada is complex, with a decentralized, three-tiered governance structure responsible for safe drinking water throughout the country. The current approach has been described as fragmented, leading to governance gaps, duplication of efforts, and an absence of accountability and enforcement. Although there have been no major waterborne disease outbreaks in Canada since 2001, a lack of performance improvement, especially in small drinking water systems, is evident. The World Health Organization water safety plan approach for drinking water management represents an alternative preventative management framework to the current conventional, reactive drinking water management strategies. This approach has seen successful implementation throughout the world and has the potential to address many of the issues with drinking water management in Canada. This paper presents a review and strengths-weaknesses-opportunities-threats analysis of drinking water management and governance in Canada at the federal, provincial/territorial, and municipal levels. Based on this analysis, a modified water safety plan (defined as the plan-do-check-act (PDCA)-WSP framework) is proposed, established from water safety plan recommendations and the principles of PDCA for continuous performance improvement. This proposed framework is designed to strengthen current drinking water management in Canada and is designed to fit within and incorporate the existing governance structure.

  7. The Role of the Quality Enhancement Plan in Engendering a Culture of Assessment

    ERIC Educational Resources Information Center

    Loughman, Thomas P.; Hickson, Joyce; Sheeks, Gina L.; Hortman, J. William

    2008-01-01

    During the past two decades, colleges and universities have used best practices from corporate management such as total quality management, strategic planning, management by objectives, benchmarking, data warehousing, and performance indicators. Many institutions of higher learning now have adopted comprehensive and multifaceted approaches to…

  8. Graduate Student Project: Operations Management Product Plan

    ERIC Educational Resources Information Center

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  9. Appendix X. ComField Information Management System.

    ERIC Educational Resources Information Center

    Coffin, Robert W.

    This appendix outlines the ComField information management system which is designed to give the project management a comprehensive tool for decisionmaking and to free instructors from tasks of keeping current records of every student's performance, help them plan their time more efficiently for counseling students and planning instruction, and…

  10. U.S. Department of Transportation performance report fiscal year 2000 and performance plan fiscal year 2002

    DOT National Transportation Integrated Search

    2001-04-01

    This document affirms the U.S. Department of Transportation's (DOT) commitment to managing for results. It is DOT's second annual performance report and fourth annual performance plan. By combining the DOT performance report on 2000 results with the ...

  11. 78 FR 71704 - Request for Comments on Draft SBA Strategic Plan for FY 2014-2018

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-29

    ... AGENCY: Office of Associate Administrator for Performance Management & Chief Financial Officer, Small.... Carver, Associate Administrator for Performance Management & Chief Financial Officer. [FR Doc. 2013-28623...-7274. Mail: U.S. Small Business Administration, Office of Performance Management & Chief Financial...

  12. Mississippi Curriculum Framework for Child Care and Guidance Management and Services (Program CIP: 20.0201--Child Care & Guidance Workers and Managers). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for child care and guidance management and services I and II. Presented first…

  13. Managing the "Performance" in Performance Management.

    ERIC Educational Resources Information Center

    Repinski, Marilyn; Bartsch, Maryjo

    1996-01-01

    Describes a five-step approach to performance management which includes (1) redefining tasks; (2) identifying skills; (3) determining what development tools are necessary; (4) prioritizing skills development; and (5) developing an action plan. Presents a hiring model that includes job analysis, job description, selection, goal setting, evaluation,…

  14. A framework for operationalization of strategic plans and metrics for corporate performance measurement in transportation asset management

    NASA Astrophysics Data System (ADS)

    Mteri, Hassan H.

    This thesis investigated the business processes required to translate corporate-level strategic plans into tactical and operational plans in the context of transportation asset management. The study also developed a framework for effective performance measure for departments of transportation. The thesis was based on a case study of transportation agencies in the U.S.A. and Canada. The scope is therefore limited or more directly applicable to transportation assets such as pavement, bridges and culverts. The goal was to address the problem of translating or managing strategic plans, especially in the context of the public sector responsible for operating transportation infrastructure. It was observed that many agencies have been successful in formulating good strategic plans but they have performed relatively poorly in translating such corporate-level strategic plans into operational activities. A questionnaire survey was designed and targeted about 30 state agencies that are currently active in transportation asset management. Twenty one (21) transportation agencies in the USA and Canada responded to the questionnaire. The analysis of the questionnaire data showed that there is a lack of a standard approach to managing corporate strategic plans in transportation agencies. The results also indicated that most transportation agencies operate in three organizational levels but there was no systematic approach of translating goal and objectives from high level to lower levels. Approaches in performance measurement were found to vary from agency to agency. A number of limitations were identified in the existing practice on performance measurements. Key weaknesses include the large number of measures in use (as many as 25 or more), and the disconnection between the measures used and the corporate goals and objectives. Lessons from the private sector were thoroughly reviewed in order to build the groundwork for adapting existing tools to the public sector. The existing literature, assumptions and characteristics that make the Balanced Scorecards and strategy maps work effectively in the private sector were identified. Gaps in implementation of strategic plans and the use of Balanced Scorecard in the public sector were derived. Although Balanced Scorecards have previously been used to a limited extent in transportation agencies, the use of combined Balanced Scorecards and strategy maps with a much broader utility of translating strategic plans into tactical and operational activities for Transportation Asset Management is yet to be established. The thesis presents a framework to operationalize strategic plans through the combined application of Balanced Scorecards and strategy maps. The proposed framework aligns overarching objectives in all organizational levels: corporate, tactical, and operation, in which detail information is delegated from top level to lower levels. Furthermore, the thesis presents a proposed framework for developing and using effective corporate performance measures. The framework for performance measures provides a key tool for tracking progress and ensuring overall operationalization of strategic plans in transportation agencies. The thesis presents a methodology to assess existing performance measures so that agencies can reduce the number of measures, to be more effective and manageable. It was found that among other good characteristics, corporate performance measures must be tied to agency's goals and objectives and must be sensitive or responsive to program delivery activities and to the impacts of decisions about resource allocation.

  15. Vis-A-Plan /visualize a plan/ management technique provides performance-time scale

    NASA Technical Reports Server (NTRS)

    Ranck, N. H.

    1967-01-01

    Vis-A-Plan is a bar-charting technique for representing and evaluating project activities on a performance-time basis. This rectilinear method presents the logic diagram of a project as a series of horizontal time bars. It may be used supplementary to PERT or independently.

  16. \\t Capital Planning and Investment Control (CPIC) for the Management of Information Technology Investments

    EPA Pesticide Factsheets

    Capital Planning and Investment Control (CPIC) is the Information Technology (IT) governance and management methodology in use at EPA for selecting, controlling and evaluating the performance of EPA IT investments throughout the full lifecycle.

  17. Tank waste remediation system configuration management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less

  18. Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burgard, K.G.

    This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes tomore » systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.« less

  19. Guidelines for developing NASA (National Aeronautics and Space Administration) ADP security risk management plans

    NASA Technical Reports Server (NTRS)

    Tompkins, F. G.

    1983-01-01

    This report presents guidance to NASA Computer security officials for developing ADP security risk management plans. The six components of the risk management process are identified and discussed. Guidance is presented on how to manage security risks that have been identified during a risk analysis performed at a data processing facility or during the security evaluation of an application system.

  20. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GRYGIEL, M.L.

    1998-10-08

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less

  1. Pricing and performance in health maintenance organizations: a strategic management perspective.

    PubMed

    Conant, J S; Mokwa, M P; Burnett, J J

    1989-03-01

    Innovative, consumer-oriented pricing strategies have contributed to the impressive growth of health maintenance organizations (HMOs). In a national study of HMO marketing directors, the relationships between strategic management style and (1) the relative importance of pricing in competitive marketing strategy, (2) the effectiveness of price strategy planning, and (3) financial performance are examined. The findings indicate that HMOs practicing effective price planning also perform well on an overall basis. Insight into the content and substance of HMO pricing strategies is also provided.

  2. Mississippi Curriculum Framework for Agriculture Business and Management (Program CIP: 01.0101--Agriculture Business & Mgmt., Gen.). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for agriculture business and management (ABM) I and II. Presented first are a…

  3. Strategic planning in Brazilian protected areas: Uses and adjustments.

    PubMed

    Barreto, Cristiane Gomes; Drummond, José Augusto L

    2017-09-15

    Management plans for protected areas commonly use strategic planning tools in their drafting. It is proposed that the adequate use of the instruments of planning and management of protected areas can improve their strategic competitiveness, providing greater financial and administrative independence, enabling them to be economically sustainable organizations. This study evaluated the application of concepts and strategy formulation, strategy principles and competitiveness, organizational diagnosis, strategic maps, scenarios, and other strategic planning instruments used for conservation management in Brazil. 25 management plans of 25 different protected areas were selected and studied, with special attention to the indicators used in each plan. Results indicate that there is a high suitability for the application of SP tools to the universe of protected areas, although management plans did not take full advantage of these tools. We also found that the broader use of these tools did not guarantee greater managerial effectiveness. We suggest that other governance variables beyond planning strategies must be improved, to ensure a better performance of protected areas. Copyright © 2017 Elsevier Ltd. All rights reserved.

  4. Private Health Plans’ Contracts with Managed Behavioral Healthcare Organizations

    PubMed Central

    Garnick, Deborah W.; Horgan, Constance M.; Merrick, Elizabeth L.; Hodgkin, Dominic; Reif, Sharon; Quinn, Amity E.; Stewart, Maureen; Creedon, Timothy B.

    2015-01-01

    Contracts between health plans and managed behavioral health care organizations (MBHOs) influence access and quality of behavioral health care. This report presents information on performance requirements, information sharing, and financial risk from a nationally representative survey of private health plans. Most contracts include geographic access to providers (93.3%) and NCQA’s performance standards (84.2%). Health plans and MBHOs share data (99.0%), generally by the MBHO sending information to the health plan (96.3%). About a quarter of contracts impose financial penalties (23.0%), but few include incentives related to performance standards (<1.0%). Contract terms can shape the provision of behavioral health services in response to changes such as parity legislation or health reform. If current trends continue towards increases in value-based purchasing in the privately financed behavioral health sector, the focus on quality in contracts between health plans and MBHOs will be critical to understand. PMID:26276421

  5. Managed care quality of care and plan choice in New York SCHIP.

    PubMed

    Liu, Hangsheng; Phelps, Charles E; Veazie, Peter J; Dick, Andrew W; Klein, Jonathan D; Shone, Laura P; Noyes, Katia; Szilagyi, Peter G

    2009-06-01

    To examine whether low-income parents of children enrolled in the New York State Children's Health Insurance Program (SCHIP) choose managed care plans with better quality of care. 2001 New York SCHIP evaluation data; 2001 New York State Managed Care Plan Performance Report; 2000 New York State Managed Care Enrollment Report. Each market was defined as a county. A final sample of 2,325 new enrollees was analyzed after excluding those in markets with only one SCHIP plan. Plan quality was measured using seven Consumer Assessment of Health Plans Survey (CAHPS) and three Health Plan Employer Data and Information Set (HEDIS) scores. A conditional logit model was applied with plan and individual/family characteristics as covariates. There were 30 plans in the 45 defined markets. The choice probability increased 2.5 percentage points for each unit increase in the average CAHPS score, and the association was significantly larger in children with special health care needs. However, HEDIS did not show any statistically significant association with plan choice. Low-income parents do choose managed care plans with higher CAHPS scores for their newly enrolled children, suggesting that overall quality could improve over time because of the dynamics of enrollment.

  6. Army Justified Initial Production Plan for the Paladin Integrated Management Program but Has Not Resolved Two Vehicle Performance Deficiencies (Redacted)

    DTIC Science & Technology

    2016-08-05

    Department of Defense Report No. DODIG-2016-118 A U G U S T 5 , 2 0 1 6 Army Justified Initial Production Plan for the Paladin Integrated Management... model oversight organization in the Federal Government by leading change, speaking truth, and promoting excellence—a diverse organization, working...DODIG-2016-118 (Project No. D2016-D000AU-0003.000) │ i Results in Brief Army Justified Initial Production Plan for the Paladin Integrated Management

  7. Evaluation of participatory planning: Lessons from Hungarian Natura 2000 management planning processes.

    PubMed

    Kovács, Eszter; Kelemen, Eszter; Kiss, Gabriella; Kalóczkai, Ágnes; Fabók, Veronika; Mihók, Barbara; Megyesi, Boldizsár; Pataki, György; Bodorkós, Barbara; Balázs, Bálint; Bela, Györgyi; Margóczi, Katalin; Roboz, Ágnes; Molnár, Dániel

    2017-12-15

    Stakeholder participation in nature conservation policies and especially in the management of protected areas has gained importance in the last decades. These changes are underlined by democratic principles and the perceived contribution of stakeholder involvement to the effectiveness of conservation management. Evaluating participatory processes is essential to learn about the past and thus increase the quality of future processes. The evaluation can be useful for the organisations responsible for planning and management, stakeholders and policy makers as well. The present paper shows the results of a systematic evaluation of 25 participatory processes related to the development of management plans for Natura 2000 sites in Hungary between 2007 and 2015. A conceptual framework was developed to evaluate the process and outcome of participatory management planning processes. Criteria were based on the scientific literature on public participation and tailored to conservation-related management planning and stakeholder involvement. Evaluated processes were grouped in three cases based on their time range and financial sources. Overall, the analysed processes scored at a medium level, showing better performance in the process criteria than in the outcome criteria. The best case scored significantly higher in four criteria compared to the other cases: representativeness, resource availability for facilitation, new, creative ideas and impact on the plan. The main factors behind the success were (1) embeddedness of the planning process in a larger project, where the plan was a tool for conservation, (2) carrying out only one process at a time, (3) previous experience of facilitators and planners with participatory planning and (4) the opportunity and capacity to propose a payment scheme as an incentive. But even this case received low scores in some criteria: conflict resolution, early involvement and well defined goals. Based on the results we suggest that more data is needed to evaluate the implementation of the plans and, in many cases, the impact of the process on the plan. Performance can be improved with the assistance of policy makers by further developing guidelines, harmonising payment schemes with the conservation measures of the plans and providing training on conflict resolution. The evaluation framework proved to be suitable for the assessment of a large set of conservation related management planning processes, but it also had some limitations, e.g. concerning the incorporation of stakeholders' views in the evaluation. Copyright © 2017 Elsevier Ltd. All rights reserved.

  8. Introduction of the UNIX International Performance Management Work Group

    NASA Technical Reports Server (NTRS)

    Newman, Henry

    1993-01-01

    In this paper we presented the planned direction of the UNIX International Performance Management Work Group. This group consists of concerned system developers and users who have organized to synthesize recommendations for standard UNIX performance management subsystem interfaces and architectures. The purpose of these recommendations is to provide a core set of performance management functions and these functions can be used to build tools by hardware system developers, vertical application software developers, and performance application software developers.

  9. Photovoltaic system criteria documents. Volume 1: Guidelines for evaluating the management and operations planning of photovoltaic applications

    NASA Technical Reports Server (NTRS)

    Koenig, John C.; Billitti, Joseph W.; Tallon, John M.

    1979-01-01

    Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).

  10. Strategic planning: today's hot buttons.

    PubMed

    Bohlmann, R C

    1998-01-01

    The first generation of mergers and managed care hasn't slowed down group practices' need for strategic planning. Even groups that already went through one merger are asking about new mergers or ownership possibilities, the future of managed care, performance standards and physician unhappiness. Strategic planning, including consideration of bench-marking, production of ancillary services and physician involvement, can help. Even if only a short, general look at the future, strategic planning shows the proactive leadership needed in today's environment.

  11. 76 FR 43237 - Patient Protection and Affordable Care Act; Establishment of Consumer Operated and Oriented Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ... General OMB Office of Management and Budget PHS Act Public Health Service Act QHP Qualified Health Plan...) performs some of the issuer's management functions under contract or delegation. Thus, CMS would permit a... billing, and case management from a health insurance issuer that existed on July 16, 2009, as long as the...

  12. Policy options evaluation tool for managed lanes (POET-ML) users guide and methodology description : Federal Highway Administration HOV lane performance

    DOT National Transportation Integrated Search

    2008-12-01

    Users guide for a sketch planning tool for exploring policy alternatives. It is intended for an audience of transportation professionals responsible for planning, designing, funding, operating, enforcing, monitoring, and managing HOV and HOT lanes...

  13. Assessments of managed care organizations in the Greater Baton Rouge area by physicians and physicians' office managers.

    PubMed

    Cassidy, W M; Dyson, T; Grenier, C E

    2001-03-01

    Health care quality assessment under managed care organizations is usually derived from two sources: (1) consumer satisfaction surveys, and (2) The Health Plan Employer Data Information Set reports. There is little published data regarding physicians' critiques. This study surveyed physicians and office managers as to the quality of healthcare under 10 managed care organizations in the Greater Baton Rouge area. Performance indicators in the physician questionnaire focused on personal satisfaction, perception of patient satisfaction, and mental health coverage. The office managers' checklist included payment and certification issues, telephone time spent gaining certification, level of knowledge among plan enrollees of their benefits, appeal process, and adequacy of reimbursement. Means were calculated for each performance indicator and managed care organizations were ranked. Tukey-Kramer's post-hoc multiple comparisons test was used to confirm rank order validity. Significant differences were found among companies. Significant rank-order agreement by both physicians and office managers was evident. The usefulness of such surveys and performing them annually is discussed.

  14. Standardization of quality control plans for highway bridges in Europe: COST Action TU 1406

    NASA Astrophysics Data System (ADS)

    Casas, Joan R.; Matos, Jose Campos e.

    2017-09-01

    In Europe, as all over the world, the need to manage roadway bridges in an efficient way led to the development of different management systems. Hence, nowadays, many European countries have their own system. Although they present a similar architectural framework, several differences can be appointed. These differences constitute a divergent mechanism that may conduct to different decisions on maintenance actions. Within the roadway bridge management process, the identification of maintenance needs is more effective when developed in a uniform and repeatable manner. This process can be accomplished by the identification of performance indicators and definition of performance goals and key performance indicators (KPI), improving the planning of maintenance strategies. Therefore, a discussion at a European level, seeking to achieve a standardized approach in this subject, will bring significant benefits. Accordingly, a COST Action is under way in Europe with the aim of standardizing the establishment of quality control plans for roadway bridges.

  15. Does Your Health Plan Measure Up? How Can You Tell?

    ERIC Educational Resources Information Center

    Edwards, Tom

    1999-01-01

    Describes the process behind health-plan selection for school district employees and offers suggestions on how managers might enhance their current healthcare plan purchasing process. Areas of health-plan review and critique are listed as are tips for measuring plan performance and advice on acquiring backup data on plan quality. (GR)

  16. Tank waste remediation system privatization infrastructure program, configuration management implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schaus, P.S.

    This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program`s products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control.

  17. Visual Decision Support Tool for Supporting Asset Management Performance, Risk, and Cost Analysis (WERF Report INFR5R12)

    EPA Science Inventory

    Abstract:Managing urban water infrastructures faces the challenge of jointly dealing with assets of diverse types, useful life, cost, ages and condition. Service quality and sustainability require sound long-term planning, well aligned with tactical and operational planning and m...

  18. Managed Care Quality of Care and Plan Choice in New York SCHIP

    PubMed Central

    Liu, Hangsheng; Phelps, Charles E; Veazie, Peter J; Dick, Andrew W; Klein, Jonathan D; Shone, Laura P; Noyes, Katia; Szilagyi, Peter G

    2009-01-01

    Objective To examine whether low-income parents of children enrolled in the New York State Children's Health Insurance Program (SCHIP) choose managed care plans with better quality of care. Data Sources 2001 New York SCHIP evaluation data; 2001 New York State Managed Care Plan Performance Report; 2000 New York State Managed Care Enrollment Report. Study Design Each market was defined as a county. A final sample of 2,325 new enrollees was analyzed after excluding those in markets with only one SCHIP plan. Plan quality was measured using seven Consumer Assessment of Health Plans Survey (CAHPS) and three Health Plan Employer Data and Information Set (HEDIS) scores. A conditional logit model was applied with plan and individual/family characteristics as covariates. Principle Findings There were 30 plans in the 45 defined markets. The choice probability increased 2.5 percentage points for each unit increase in the average CAHPS score, and the association was significantly larger in children with special health care needs. However, HEDIS did not show any statistically significant association with plan choice. Conclusions Low-income parents do choose managed care plans with higher CAHPS scores for their newly enrolled children, suggesting that overall quality could improve over time because of the dynamics of enrollment. PMID:19208091

  19. Study of airborne science experiment management concepts for application to space shuttle. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Mulholland, D. R.; Reller, J. O., Jr.; Neel, C. B.; Haughney, L. C.

    1973-01-01

    The management concepts and operating procedures are documented as they apply to the planning of shuttle spacelab operations. Areas discussed include: airborne missions; formulation of missions; management procedures; experimenter involvement; experiment development and performance; data handling; safety procedures; and applications to shuttle spacelab planning. Characteristics of the airborne science experience are listed, and references and figures are included.

  20. The Management Development Needs of Front-Line Managers: Voices from the Field.

    ERIC Educational Resources Information Center

    Longenecker, Clinton O.; Neubert, Mitchell

    2003-01-01

    A survey of 524 managers identified key practices to improve performance in a changing environment: clarifying roles, goals, and expectations; ongoing performance evaluation, feedback, and coaching; mentoring; challenging assignments; formal career planning; customer contact; cross-training; and 360-degree feedback. (Contains 31 references.) (SK)

  1. Managing for Results--Linking Performance Measures and Budgets.

    ERIC Educational Resources Information Center

    McGee, William L.; Fountain, James R., Jr.

    1995-01-01

    The Government Accounting Standards Board notion of service efforts and accomplishments reporting is one step in a process of managing for results that includes strategic planning, development and use of performance measures of managing ongoing programs, and outputs to budgetary appropriation. Reports a trial application to one school district.…

  2. State-based Marketplaces using 'clearinghouse' plan management models are associated with lower premiums.

    PubMed

    Krinn, Kelly; Karaca-Mandic, Pinar; Blewett, Lynn A

    2015-01-01

    The state-based and federally facilitated health insurance Marketplaces, or exchanges, enrolled more than eight million people during the first open enrollment period, which ended March 31, 2014. There is significant variation in how states have designed and implemented their Marketplaces. We examined how premiums varied with states' involvement in the Marketplaces through governance, plan management authority, and strategy during the first year that the exchanges have been open. State-based Marketplaces using "clearinghouse" plan management models had significantly lower adjusted average premiums for all plans within each metal level compared to state-based Marketplaces using "active purchaser" models and the federally facilitated and partnership Marketplaces. Clearinghouse management models are those in which all health plans that meet published criteria are accepted. Active purchaser models are those in which states negotiate premiums, provider networks, number of plans, and benefits. Our baseline estimates provide valuable benchmarks for evaluating future performance of states' involvement in governance, plan management, and regulatory authority of the insurance Marketplaces. Project HOPE—The People-to-People Health Foundation, Inc.

  3. Delaware Valley Regional Planning Commission Philadelphia Metropolitan Region : planning for congestion

    DOT National Transportation Integrated Search

    2009-04-01

    The Delaware Valley Regional Planning Commission uses a systematic process for managing traffic congestion and monitoring transportation system performance in the Philadelphia metropolitan region. Guided by an advisory team of stakeholders, the agenc...

  4. Cost sharing and HEDIS performance.

    PubMed

    Chernew, Michael; Gibson, Teresa B

    2008-12-01

    Physicians, health plans, and health systems are increasingly evaluated and rewarded based on Health Plan Effectiveness Data and Information Set (HEDIS) and HEDIS-like performance measures. Concurrently, employers and health plans continue to try to control expenditures by increasing out-of-pocket costs for patients. The authors use fixed-effect logit models to assess how rising copayment rates for physician office visits and prescription drugs affect performance on HEDIS measures. Findings suggest that the increase in copayment rates lowers performance scores, demonstrating the connection between financial aspects of plan design and quality performance, and highlighting the potential weakness of holding plans and providers responsible for performance when payers and benefit plan managers also influence performance. Yet the effects are not consistent across all domains and, in many cases, are relatively modest in magnitude. This may reflect the HEDIS definitions and suggests that more sensitive measures may capture the impact of benefit design changes on performance.

  5. TRU Waste Management Program. Cost/schedule optimization analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  6. Association Between Health Plan Exit From Medicaid Managed Care and Quality of Care, 2006-2014

    PubMed Central

    Schpero, William L.; Schlesinger, Mark J.; Trivedi, Amal N.

    2017-01-01

    Importance State Medicaid programs have increasingly contracted with insurers to provide medical care services for enrollees (Medicaid managed care plans). Insurers that provide these plans can exit Medicaid programs each year, with unclear effects on quality of care and health care experiences. Objective To determine the frequency and interstate variation of health plan exit from Medicaid managed care and evaluate the relationship between health plan exit and market-level quality. Design, Setting, and Participants Retrospective cohort of all comprehensive Medicaid managed care plans (N = 390) during the interval 2006-2014. Exposures Plan exit, defined as the withdrawal of a managed care plan from a state’s Medicaid program. Main Outcomes and Measures Eight measures from the Healthcare Effectiveness Data and Information Set were used to construct 3 composite indicators of quality (preventive care, chronic disease care management, and maternity care). Four measures from the Consumer Assessment of Healthcare Providers and Systems were combined into a composite indicator of patient experience, reflecting the proportion of beneficiaries rating experiences as 8 or above on a 0-to-10–point scale. Outcome data were available for 248 plans (68% of plans operating prior to 2014, representing 78% of beneficiaries). Results Of the 366 comprehensive Medicaid managed care plans operating prior to 2014, 106 exited Medicaid. These exiting plans enrolled 4 848 310 Medicaid beneficiaries, with a mean of 606 039 beneficiaries affected by plan exits annually. Six states had a mean of greater than 10% of Medicaid managed care recipients enrolled in plans that exited, whereas 10 states experienced no plan exits. Plans that exited from a state’s Medicaid market performed significantly worse prior to exiting than those that remained in terms of preventive care (57.5% vs 60.4%; difference, 2.9% [95% CI, 0.3% to 5.5%]), maternity care (69.7% vs 73.6%; difference, 3.8% [95% CI, 1.7% to 6.0%]), and patient experience (73.5% vs 74.8%; difference, 1.3% [95% CI, 0.6% to 1.9%]). There was no significant difference between exiting and nonexiting plans for the quality of chronic disease care management (76.2% vs 77.1%; difference, 1.0% [95% CI, −2.1% to 4.0%]). There was also no significant change in overall market performance before and after the exit of a plan: 0.7–percentage point improvement in preventive care quality (95% CI, −4.9 to 6.3); 0.2–percentage point improvement in chronic disease care management quality (95% CI, −5.8 to 6.2); 0.7–percentage point decrease in maternity care quality (95% CI, −6.4 to 5.0]); and a 0.6–percentage point improvement in patient experience ratings (95% CI, −3.9 to 5.1). Medicaid beneficiaries enrolled in exiting plans had access to coverage for a higher-quality plan, with 78% of plans in the same county having higher quality for preventive care, 71.1% for chronic disease management, 65.5% for maternity care, and 80.8% for patient experience. Conclusions and Relevance Between 2006 and 2014, health plan exit from the US Medicaid program was frequent. Plans that exited generally had lower quality ratings than those that remained, and the exits were not associated with significant overall changes in quality or patient experience in the plans in the Medicaid market. PMID:28655014

  7. Association Between Health Plan Exit From Medicaid Managed Care and Quality of Care, 2006-2014.

    PubMed

    Ndumele, Chima D; Schpero, William L; Schlesinger, Mark J; Trivedi, Amal N

    2017-06-27

    State Medicaid programs have increasingly contracted with insurers to provide medical care services for enrollees (Medicaid managed care plans). Insurers that provide these plans can exit Medicaid programs each year, with unclear effects on quality of care and health care experiences. To determine the frequency and interstate variation of health plan exit from Medicaid managed care and evaluate the relationship between health plan exit and market-level quality. Retrospective cohort of all comprehensive Medicaid managed care plans (N = 390) during the interval 2006-2014. Plan exit, defined as the withdrawal of a managed care plan from a state's Medicaid program. Eight measures from the Healthcare Effectiveness Data and Information Set were used to construct 3 composite indicators of quality (preventive care, chronic disease care management, and maternity care). Four measures from the Consumer Assessment of Healthcare Providers and Systems were combined into a composite indicator of patient experience, reflecting the proportion of beneficiaries rating experiences as 8 or above on a 0-to-10-point scale. Outcome data were available for 248 plans (68% of plans operating prior to 2014, representing 78% of beneficiaries). Of the 366 comprehensive Medicaid managed care plans operating prior to 2014, 106 exited Medicaid. These exiting plans enrolled 4 848 310 Medicaid beneficiaries, with a mean of 606 039 beneficiaries affected by plan exits annually. Six states had a mean of greater than 10% of Medicaid managed care recipients enrolled in plans that exited, whereas 10 states experienced no plan exits. Plans that exited from a state's Medicaid market performed significantly worse prior to exiting than those that remained in terms of preventive care (57.5% vs 60.4%; difference, 2.9% [95% CI, 0.3% to 5.5%]), maternity care (69.7% vs 73.6%; difference, 3.8% [95% CI, 1.7% to 6.0%]), and patient experience (73.5% vs 74.8%; difference, 1.3% [95% CI, 0.6% to 1.9%]). There was no significant difference between exiting and nonexiting plans for the quality of chronic disease care management (76.2% vs 77.1%; difference, 1.0% [95% CI, -2.1% to 4.0%]). There was also no significant change in overall market performance before and after the exit of a plan: 0.7-percentage point improvement in preventive care quality (95% CI, -4.9 to 6.3); 0.2-percentage point improvement in chronic disease care management quality (95% CI, -5.8 to 6.2); 0.7-percentage point decrease in maternity care quality (95% CI, -6.4 to 5.0]); and a 0.6-percentage point improvement in patient experience ratings (95% CI, -3.9 to 5.1). Medicaid beneficiaries enrolled in exiting plans had access to coverage for a higher-quality plan, with 78% of plans in the same county having higher quality for preventive care, 71.1% for chronic disease management, 65.5% for maternity care, and 80.8% for patient experience. Between 2006 and 2014, health plan exit from the US Medicaid program was frequent. Plans that exited generally had lower quality ratings than those that remained, and the exits were not associated with significant overall changes in quality or patient experience in the plans in the Medicaid market.

  8. Total Quality Management Implementation Plan: DLA-N

    DTIC Science & Technology

    1989-07-01

    e Wastimto , n. Othe 20 Seato3 4. TITLE AND SUBTITLE S. FUNDING NUMBERS DLA-N Total Quality Management 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S...PAGES TQM (Total Quality Management ), Continuous Process Improvement.(; , Defense National Stockpile 16. PRICE CODEI17. SECURITY CLASSIFICATION 18...IUNCLASSIFIED UL NSN 7540-01-280-5500 Standard Form 298 (Rev. 2-89) pr"!Cbed ty ANSI Std Z39’B6 296-102 DLA - N TOTAL QUALITY MANAGEMENT IMPLEMENTATION PLAN I

  9. Integrating socio-economic and biophysical data to enhance watershed management and planning

    NASA Astrophysics Data System (ADS)

    Pirani, Farshad Jalili; Mousavi, Seyed Alireza

    2016-09-01

    Sustainability has always been considered as one of the main aspects of watershed management plans. In many developing countries, watershed management practices and planning are usually performed by integrating biophysical layers, and other existing layers which cannot be identified as geographic layers are ignored. We introduce an approach to consider some socioeconomic parameters which are important for watershed management decisions. Ganj basin in Chaharmahal-Bakhtiari Province was selected as the case study area, which includes three traditional sanctums: Ganj, Shiremard and Gerdabe Olya. Socioeconomic data including net agricultural income, net ranching income, population and household number, literacy rate, unemployment rate, population growth rate and active population were mapped within traditional sanctums and then were integrated into other biophysical layers. After overlaying and processing these data to determine management units, different quantitative and qualitative approaches were adopted to achieve a practical framework for watershed management planning and relevant plans for homogeneous units were afterwards proposed. Comparing the results with current plans, the area of allocated lands to different proposed operations considering both qualitative and quantitative approaches were the same in many cases and there was a meaningful difference with current plans; e.g., 3820 ha of lands are currently managed under an enclosure plan, while qualitative and quantitative approaches in this study suggest 1388 and 1428 ha to be allocated to this operation type, respectively. Findings show that despite the ambiguities and complexities, different techniques could be adopted to incorporate socioeconomic conditions in watershed management plans. This introductory approach will help to enhance watershed management decisions with more attention to societal background and economic conditions, which will presumably motivate local communities to participate in watershed management plans.

  10. Methodological Issues in the Study of Air Force Organizational Structures,

    DTIC Science & Technology

    MOTIVATION, MORALE, PERFORMANCE(HUMAN), LEADERSHIP , SKILLS, MANAGEMENT PLANNING AND CONTROL, MODEL THEORY , SYMPOSIA...RESOURCE MANAGEMENT , *HUMAN RESOURCES, *MANPOWER UTILIZATION, *JOB ANALYSIS, *ORGANIZATIONS, STRUCTURES, PERSONNEL MANAGEMENT , DECISION MAKING

  11. Development and demonstration of an on-board mission planner for helicopters

    NASA Technical Reports Server (NTRS)

    Deutsch, Owen L.; Desai, Mukund

    1988-01-01

    Mission management tasks can be distributed within a planning hierarchy, where each level of the hierarchy addresses a scope of action, and associated time scale or planning horizon, and requirements for plan generation response time. The current work is focused on the far-field planning subproblem, with a scope and planning horizon encompassing the entire mission and with a response time required to be about two minutes. The far-feld planning problem is posed as a constrained optimization problem and algorithms and structural organizations are proposed for the solution. Algorithms are implemented in a developmental environment, and performance is assessed with respect to optimality and feasibility for the intended application and in comparison with alternative algorithms. This is done for the three major components of far-field planning: goal planning, waypoint path planning, and timeline management. It appears feasible to meet performance requirements on a 10 Mips flyable processor (dedicated to far-field planning) using a heuristically-guided simulated annealing technique for the goal planner, a modified A* search for the waypoint path planner, and a speed scheduling technique developed for this project.

  12. National Aeronautics and Space Administration FY 02 Revised Final Annual Performance Plan

    NASA Technical Reports Server (NTRS)

    2002-01-01

    The Government Performance and Results Act (GPRA) was passed by Congress and signed by the President in 1993. GPRA was enacted to improve the efficiency of all Federal agencies, with the following specific goals: (1) Improve Federal program management, effectiveness, and public accountability; (2) Improve Congressional decision making on where to commit the Nation's financial and human resources; and (3) Improve citizen confidence in government performance. GPRA directs Executive Branch agencies to develop a customer-focused strategic plan that aligns activities with concrete missions and goals. The Act directs agencies to manage and measure results to justify Congressional appropriations and authorizations. The Report Consolidation Act of 2000 directs agencies to provide a report on the degree of success in achieving the goals and performance measures defined in the strategic and performance plans one hundred and fifty days after the completion of the fiscal year.

  13. Project resources planning and control

    NASA Technical Reports Server (NTRS)

    Sibbers, C. W.

    1984-01-01

    This report contains instructional guidelines for the resources planning and control of research and development (R&D) projects managed by NASA's Langley Research Center (LaRC). Although written to serve primarily as a practical guide and reference for those LaRC personnel who perform resources planning, analysis, control, and reporting functions, it should also be meaningful to other NASA personnel who are directly or indirectly involved in or affected by these functions, especially project technical managers whose responsibilities include resources management. Certain sections should help Contractor personnel to better understand what resources information must usually be submitted on LaRC projects and what use is made of such information. The Project Manager of a large R&D project typicaly receives support from an Analyst in the area of resources management. The Analyst provides assistance in four functional areas: Planning, Analysis/Control, Administration, and Reporting. Each of these functions are discussed in detail. Examples of techniques used effectively on LaRC projects have been included where applicable. A considerable amount of information has been included on the use of Performance Measurement (Earned Value) Systems for contract cost control and reporting as little information is currently available on this subject in NASA publications.

  14. Financial performance of health plans in Medicaid managed care.

    PubMed

    McCue, Mike

    2012-01-01

    This study assesses the financial performance of health plans that enroll Medicaid members across the key plan traits, specifically Medicaid dominant, publicly traded, and provider-sponsored. National Association of Insurance Commissioners (NAIC) financial data, coupled with selected state financial data, were analyzed for 170 Medicaid health plans for 2009. A mean test compared the mean values for medical loss, administrative cost, and operating margin ratios across these plan traits. Medicaid dominant plans are plans with 75 percent of their total enrollment in the Medicaid line of business. Plans that are Medicaid dominant and publicly traded incurred a lower medical loss ratio and higher administrative cost ratio than multi-product and non-publicly traded plans. Medicaid dominant plans also earned a higher operating profit margin. Plans offering commercial and Medicare products are operating at a loss for their Medicaid line of business. Health plans that do not specialize in Medicaid are losing money. Higher medical cost rather than administrative cost is the underlying reason for this financial loss. Since Medicaid enrollees do not account for their primary book of business, these plans may not have invested in the medical management programs to reduce inappropriate emergency room use and avoid costly hospitalization.

  15. A Model for Talent Management and Career Planning

    ERIC Educational Resources Information Center

    Waheed, Sajjad; Zaim, A. Halim

    2015-01-01

    This paper discusses a talent management and career planning system designed based on the performance and qualifications of a group of interns working for an emerging social media company located in Istanbul. The proposed model is dynamic, comparative, and perceptional in constructing a talent pool for an organization. This system was developed…

  16. FY 1986 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  17. Viral Hepatitis

    MedlinePlus

    ... Performance VA Plans, Budget, & Performance VA Center for Innovation (VACI) Agency Financial Report ... Management Services Veterans Service Organizations Office of Accountability & Whistleblower ...

  18. Agent Orange

    MedlinePlus

    ... Performance VA Plans, Budget, & Performance VA Center for Innovation (VACI) Agency Financial Report ... Management Services Veterans Service Organizations Office of Accountability & Whistleblower ...

  19. Burn Pits

    MedlinePlus

    ... Performance VA Plans, Budget, & Performance VA Center for Innovation (VACI) Agency Financial Report ... Management Services Veterans Service Organizations Office of Accountability & Whistleblower ...

  20. Business plans--tips from the toolkit 6.

    PubMed

    Steer, Neville

    2010-07-01

    General practice is a business. Most practices can stay afloat by having appointments, billing patients, managing the administration processes and working long hours. What distinguishes the high performance organisation from the average organisation is a business plan. This article examines how to create a simple business plan that can be applied to the general practice setting and is drawn from material contained in The Royal Australian College of General Practitioners' 'General practice management toolkit'.

  1. High resolution microwave spectrometer sounder (HIMSS), volume 1, book 2

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The following topics are presented with respect to the high resolution microwave spectrometer sounder (HIMSS) that is to be used as an instrument for NASA's Earth Observing System (EOS): (1) preliminary program plans; (2) contract end item (CEI) specification; and (3) the instrument interface description document. Under the preliminary program plans section, plans dealing with the following subject areas are discussed: spares, performance assurance, configuration management, software implementation, contamination, calibration management, and verification.

  2. Economic perspective on strategic human capital management and planning for the Centers for Disease Control and Prevention.

    PubMed

    Roy, Kakoli; Chen, Zhuo Adam; Crawford, Carol A Gotway

    2009-11-01

    An organization's workforce--or human capital--is its most valuable asset. The 2002 President's Management Agenda emphasizes the importance of strategic human capital management by requiring all federal agencies to improve performance by enhancing personnel and compensation systems. In response to these directives, the Centers for Disease Control and Prevention (CDC) drafted its strategic human capital management plan to ensure that it is aligned strategically to support the agency's mission and its health protection goals. In this article, we explore the personnel economics literature to draw lessons from research studies that can help CDC enhance its human capital management and planning. To do so, we focus on topics that are of practical importance and empirical relevance to CDC's internal workforce and personnel needs with an emphasis on identifying promising research issues or methodological approaches. The personnel economics literature is rich with theoretically sound and empirically rigorous approaches for shaping an evidence-based approach to human capital management that can enhance incentives to attract, retain, and motivate a talented federal public health workforce, thereby promoting the culture of high-performance government.

  3. North Dakota Metropolitan Planning Organization's peer exchange on introducing performance management into the MPO planning process : A TPCB Exchange

    DOT National Transportation Integrated Search

    1997-02-01

    This technical memorandum was developed as part of the study, Systems Planning for Automated Commercial Vehicle Licensing and Permitting Systems. The objective of this study was to define the requirements and develop a plan for a national progr...

  4. Winning performance improvement strategies--linking documentation and accounts receivable.

    PubMed

    Braden, J H; Swadley, D

    1996-01-01

    When the HIM department at The University of Texas Medical Branch set out to improve documentation and accounts receivable management, it established a plan that encompassed a broad spectrum of data management process changes. The department examined and acknowledged the deficiencies in data management processes and used performance improvement tools to achieve successful results.

  5. Current and future directions in Medi-Cal chronic disease care management: a view from the top.

    PubMed

    Goldman, L Elizabeth; Handley, Margaret; Rundall, Thomas G; Schillinger, Dean

    2007-05-01

    To determine the extent to which Medicaid managed care (MMC) organizations are engaged in chronic disease care management (CDCM), tailor CDCM for diverse populations, or plan to expand CDCM. Web-based survey of 23 eligible California MMC health plan executives in fall 2005. Frequency distributions of survey responses. Nineteen (83%) of 23 executives responded, representing 2.5 million beneficiaries. Eighteen (95%) MMC plans reported implementing 1 or more elements of CDCM. Although plans used a wide range of CDCM strategies to reach performance goals, most implemented provider awareness activities such as offering guidelines or disease-specific feedback to physician groups. More than half of the plans reported interest in expanding CDCM to include more active interventions such as disease registries, pay for performance, telephone counseling to patients, and other self-management support programs. Few plans reported tailoring their CDCM to vulnerable member populations such as those with limited literacy or limited English proficiency. Executives reported that insufficient financial resources at the plan level, lack of organizational leadership and commitment in physician organizations, and limited information technology in physician offices were barriers to CDCM expansion. California MMC health plans reported substantial interest in CDCM and a desire to increase CDCM. Representatives reported intentions to expand to strategies that more directly engage providers and patients. To ensure that the growing number of vulnerable enrollees with chronic disease receive high-quality care, policy efforts should focus on enabling MMC health plans to more consistently implement and target population-based strategies such as CDCM.

  6. Ernest Orlando Lawrence Berkeley National Laboratory Institutional Plan FY 2000-2004

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chartock, Mike; Hansen, Todd

    1999-08-01

    The FY 2000-2004 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab, the Laboratory) mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. To advance the Department of Energy's ongoing efforts to define the Integrated Laboratory System, the Berkeley Lab Institutional Plan reflects the strategic elements of our planning efforts. The Institutional Plan is a management report that supports the Department of Energy's mission and programs and is an element of the Department of Energy's strategicmore » management planning activities, developed through an annual planning process. The Plan supports the Government Performance and Results Act of 1993 and complements the performance-based contract between the Department of Energy and the Regents of the University of California. It identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by Berkeley Lab's scientific and support divisions.« less

  7. Alcohol and Cirrhosis

    MedlinePlus

    ... Performance VA Plans, Budget, & Performance VA Center for Innovation (VACI) Agency Financial Report ... Management Services Veterans Service Organizations Office of Accountability & Whistleblower ...

  8. Diseases and Conditions

    MedlinePlus

    ... Performance VA Plans, Budget, & Performance VA Center for Innovation (VACI) Agency Financial Report ... Management Services Veterans Service Organizations Office of Accountability & Whistleblower ...

  9. VA Caregiver Support

    MedlinePlus

    ... Performance VA Plans, Budget, & Performance VA Center for Innovation (VACI) Agency Financial Report ... Management Services Veterans Service Organizations Office of Accountability & Whistleblower ...

  10. Military Sexual Trauma

    MedlinePlus

    ... Performance VA Plans, Budget, & Performance VA Center for Innovation (VACI) Agency Financial Report ... Management Services Veterans Service Organizations Office of Accountability & Whistleblower ...

  11. Using a Spend Analysis to Help Identify Prospective Air Force Purchasing and Supply Management Initiatives. Summary of Selected Findings

    DTIC Science & Technology

    2004-04-01

    Management, Vol. 22, No. 3, Fall 1986, pp. 2–7. Hamel, G., and C. K. Prahaled, “ Strategic Intent ,” Harvard Business Review, May-June 1989, pp. 63–76...PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Department of the AIr Force, Strategic Planning Division,Directorate of Plans,Washington,DC,20330 8...Contract F49642-01-C-0003. Further information may be obtained from the Strategic Planning Division, Directorate of Plans, Hq USAF. iii PREFACE A growing

  12. The Business Change Initiative: A Novel Approach to Improved Cost and Schedule Management

    NASA Technical Reports Server (NTRS)

    Shinn, Stephen A.; Bryson, Jonathan; Klein, Gerald; Lunz-Ruark, Val; Majerowicz, Walt; McKeever, J.; Nair, Param

    2016-01-01

    Goddard Space Flight Center's Flight Projects Directorate employed a Business Change Initiative (BCI) to infuse a series of activities coordinated to drive improved cost and schedule performance across Goddard's missions. This sustaining change framework provides a platform to manage and implement cost and schedule control techniques throughout the project portfolio. The BCI concluded in December 2014, deploying over 100 cost and schedule management changes including best practices, tools, methods, training, and knowledge sharing. The new business approach has driven the portfolio to improved programmatic performance. The last eight launched GSFC missions have optimized cost, schedule, and technical performance on a sustained basis to deliver on time and within budget, returning funds in many cases. While not every future mission will boast such strong performance, improved cost and schedule tools, management practices, and ongoing comprehensive evaluations of program planning and control methods to refine and implement best practices will continue to provide a framework for sustained performance. This paper will describe the tools, techniques, and processes developed during the BCI and the utilization of collaborative content management tools to disseminate project planning and control techniques to ensure continuous collaboration and optimization of cost and schedule management in the future.

  13. Improving DOE Project Performance Using the DOD Integrated Master Plan - 12481

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alleman, Glen B.; Nosbisch, Michael R.

    2012-07-01

    DOE O 413 measures a project's progress to plan by the consumption of funding, the passage of time, and the meeting of milestones. In March of 2003, then Under Secretary, Energy, Science, Card received a memo directing the implementation of Project Management and the Project Management Manual, including the Integrated Master Plan and Integrated Master Schedule. This directive states 'the integrated master plan and schedule tie together all project tasks by showing their logical relationships and any constraints controlling the start or finish of each task. This process results in a hierarchy of related functional and layered schedules derived frommore » the Work Breakdown Structure that can be used for monitoring and controlling project progress'. This paper shows how restoring the IMP/IMS paradigm to DOE program management increases the probability of program success in ways not currently available using DOD O 413 processes alone. Using DOE O 413 series guidance, adding the Integrated Master Plan and Integrated Master Schedule paradigm would provide a hierarchical set of performance measures for each 'package of work,' that provides measurable visibility to the increasing maturity of the project. This measurable maturity provides the mechanism to forecast future performance of cost, schedule, and technical outcomes in ways not available using just the activities in DOE O 413. With this information project managers have another tool available to address the issues identified in GAO-07-336 and GAO-09-406. (authors)« less

  14. Research and technology goals and objectives for Integrated Vehicle Health Management (IVHM)

    NASA Technical Reports Server (NTRS)

    1992-01-01

    Integrated Vehicle Health Management (IVHM) is defined herein as the capability to efficiently perform checkout, testing, and monitoring of space transportation vehicles, subsystems, and components before, during, and after operational This includes the ability to perform timely status determination, diagnostics, and prognostics. IVHM must support fault-tolerant response including system/subsystem reconfiguration to prevent catastrophic failures; and IVHM must support the planning and scheduling of post-operational maintenance. The purpose of this document is to establish the rationale for IVHM and IVHM research and technology planning, and to develop technical goals and objectives. This document is prepared to provide a broad overview of IVHM for technology and advanced development activities and, more specifically, to provide a planning reference from an avionics viewpoint under the OAST Transportation Technology Program Strategic Plan.

  15. Health Programs for Veterans

    MedlinePlus

    ... Performance VA Plans, Budget, & Performance VA Center for Innovation (VACI) Agency Financial Report ... Management Services Veterans Service Organizations Office of Accountability & Whistleblower ...

  16. Mental Health and HIV

    MedlinePlus

    ... Performance VA Plans, Budget, & Performance VA Center for Innovation (VACI) Agency Financial Report ... Management Services Veterans Service Organizations Office of Accountability & Whistleblower ...

  17. What Is Decompensated Cirrhosis?

    MedlinePlus

    ... Performance VA Plans, Budget, & Performance VA Center for Innovation (VACI) Agency Financial Report ... Management Services Veterans Service Organizations Office of Accountability & Whistleblower ...

  18. Hepatitis C: Clinical Trials

    MedlinePlus

    ... Performance VA Plans, Budget, & Performance VA Center for Innovation (VACI) Agency Financial Report ... Management Services Veterans Service Organizations Office of Accountability & Whistleblower ...

  19. Patient Treatment Tracking Chart

    MedlinePlus

    ... Performance VA Plans, Budget, & Performance VA Center for Innovation (VACI) Agency Financial Report ... Management Services Veterans Service Organizations Office of Accountability & Whistleblower ...

  20. Timber RAM. . .a long-range planning method for commercial timber lands under multiple-use management

    Treesearch

    Daniel I. Navon

    1971-01-01

    Timber RAM (Resource Allocation Method) is a long-range planning method for commercial timber lands under multiple-use management. Timber RAM can produce cutting and reforestation schedules and related harvest and economic reports. Each schedule optimizes an index of performance, subject to periodic constraints on revenues, costs, and, harvest levels. Periodic...

  1. Bandwidth, Broadband, and Planning for Public Access

    ERIC Educational Resources Information Center

    Blowers, Helene

    2012-01-01

    Broadband and bandwidth allocation is an essential technology planning activity that libraries should address on a continual basis. There are five key factors that will impact your network's performance: 1. infrastructure, 2. network load, 3. workstation performance, 4. prioritization of services, and 5. network management. The author thinks it's…

  2. 75 FR 41892 - Solicitation for a Cooperative Agreement: Guidebook for Building High Performance Correctional...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-19

    ... of the guidebook on leadership, assessments, intervention, change management and other related topics...: (1) Leadership and management development, (2) information and knowledge management; (3) comprehensive criminal justice planning, (4) offender management, (5) collaborative partnerships, (6...

  3. Case Study -- Improving Management Performance

    ERIC Educational Resources Information Center

    Stait, Norman

    1970-01-01

    The Knitting, Lace, and Net Industry Training Board in Great Britain is beginning to work with management training, using three firms for experimental pilot projects. The Board plans to introduce this management system throughout the industry. (MF)

  4. Hepatitis C: Sex and Sexuality

    MedlinePlus

    ... Performance VA Plans, Budget, & Performance VA Center for Innovation (VACI) Agency Financial Report ... Management Services Veterans Service Organizations Office of Accountability & Whistleblower ...

  5. Body Shape Changes with HIV

    MedlinePlus

    ... Performance VA Plans, Budget, & Performance VA Center for Innovation (VACI) Agency Financial Report ... Management Services Veterans Service Organizations Office of Accountability & Whistleblower ...

  6. The SEA of the Future: Leveraging Performance Management to Support School Improvement. Volume 1

    ERIC Educational Resources Information Center

    Gross, Betheny, Ed.; Jochim, Ashley, Ed.

    2013-01-01

    "The SEA of the Future" is an education publication series examining how state education agencies can shift from a compliance to a performance-oriented organization through strategic planning and performance management tools to meet growing demands to support education reform while improving productivity. This inaugural edition of…

  7. Performance of district disaster management teams after undergoing an operational level planners' training in Uganda.

    PubMed

    Orach, Christopher Garimol; Mayega, Roy William; Woboya, Vincent; William, Bazeyo

    2013-06-01

    Uganda is vulnerable to several natural, man-made and a hybrid of disasters including drought, famine, floods, warfare, and disease outbreaks. We assessed the district disaster team's performance, roles and experiences following the training. The disasters most commonly experienced by the district teams were epidemics of diseases in humans (7 of 12), animals (epizoonotics) (3 of 12) and crops (3 of 12); hailstorms and floods (3 of 12). The capabilities viewed most useful for management of disasters were provision of health care services (9/12) and response management (8 of 12). The capability domains most often consulted during the disasters were general response management (31%), health services (29%) and water and sanitation (17%). The skills areas perceived to be vital following the training were response to epidemics 10/12, disaster management planning 8/12, hazards and vulnerability analysis 7/12 and principles of disaster planning 7/12 respectively. Main challenges mentioned by district teams were inadequacy of finance and logistics, lack of commitment by key partners towards disaster preparedness and response. The most common disaster experienced disasters related to outbreaks of diseases in man, animals and crops. The most frequently applied capabilities were response management and provision of emergency health services. The activities most frequently implemented following disaster management teams training were conducting planning meetings, refinement of plans and dissemination of skills gained. The main challenges were related to limited budget allocations and legal frameworks for disaster management that should be addressed by both central and local governments.

  8. 76 FR 14376 - Evaluation of State Coastal Management Programs and National Estuarine Research Reserves

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-16

    ... Management (OCRM) announces its intent to evaluate the performance of the ACE Basin (South Carolina) National... Reserve final management plan approved by the Secretary of Commerce, and adhered to the terms of financial... CFR part 923, subpart L. The CZMA requires continuing review of the performance of States with respect...

  9. Description of the computations and pilot procedures for planning fuel-conservative descents with a small programmable calculator

    NASA Technical Reports Server (NTRS)

    Vicroy, D. D.; Knox, C. E.

    1983-01-01

    A simplified flight management descent algorithm was developed and programmed on a small programmable calculator. It was designed to aid the pilot in planning and executing a fuel conservative descent to arrive at a metering fix at a time designated by the air traffic control system. The algorithm may also be used for planning fuel conservative descents when time is not a consideration. The descent path was calculated for a constant Mach/airspeed schedule from linear approximations of airplane performance with considerations given for gross weight, wind, and nonstandard temperature effects. The flight management descent algorithm and the vertical performance modeling required for the DC-10 airplane is described.

  10. When daily planning improves employee performance: The importance of planning type, engagement, and interruptions.

    PubMed

    Parke, Michael R; Weinhardt, Justin M; Brodsky, Andrew; Tangirala, Subrahmaniam; DeVoe, Sanford E

    2018-03-01

    Does planning for a particular workday help employees perform better than on other days they fail to plan? We investigate this question by identifying 2 distinct types of daily work planning to explain why and when planning improves employees' daily performance. The first type is time management planning (TMP)-creating task lists, prioritizing tasks, and determining how and when to perform them. We propose that TMP enhances employees' performance by increasing their work engagement, but that these positive effects are weakened when employees face many interruptions in their day. The second type is contingent planning (CP) in which employees anticipate possible interruptions in their work and plan for them. We propose that CP helps employees stay engaged and perform well despite frequent interruptions. We investigate these hypotheses using a 2-week experience-sampling study. Our findings indicate that TMP's positive effects are conditioned upon the amount of interruptions, but CP has positive effects that are not influenced by the level of interruptions. Through this study, we help inform workers of the different planning methods they can use to increase their daily motivation and performance in dynamic work environments. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  11. Sexual Trauma: Women Veterans Health Care

    MedlinePlus

    ... Performance VA Plans, Budget, & Performance VA Center for Innovation (VACI) Agency Financial Report ... Management Services Veterans Service Organizations Office of Accountability & Whistleblower ...

  12. Suicide Prevention: 1-800-273-8255

    MedlinePlus

    ... Performance VA Plans, Budget, & Performance VA Center for Innovation (VACI) Agency Financial Report ... Management Services Veterans Service Organizations Office of Accountability & Whistleblower ...

  13. Eating Tips for People with Cirrhosis

    MedlinePlus

    ... Performance VA Plans, Budget, & Performance VA Center for Innovation (VACI) Agency Financial Report ... Management Services Veterans Service Organizations Office of Accountability & Whistleblower ...

  14. Research Perspectives for Material Requirements Planning Systems. Paper No. 434.

    ERIC Educational Resources Information Center

    Berry, W. L.; Whybark, D. Clay

    Material requirements planning (MRP) systems are described as management tools for planning and controlling production operations. A wide variety of industries and production organizations are credited as reporting significant operating improvements in such areas as inventory control, production scheduling, delivery performance, and production…

  15. A Planning Process and the Integration of Institutional Research.

    ERIC Educational Resources Information Center

    Spencer, R.; And Others

    Consisting mainly of charts, graphs, and lists, this publication presents materials used in the Delaware County Community College (DCCC) planning and institutional research processes. Guidelines for establishing DCCC mission, goals, objectives, and management by objectives performance standards relative to planning changes, instructional programs,…

  16. 7 CFR 4284.908 - Use of grant and matching funds.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... used to develop a business plan or perform a feasibility study to establish a viable marketing... to develop, a business operations plan that provides comprehensive detail on the management, planning... 4284.908 Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS...

  17. Waste Encapsulation and Storage Facility (WESF) Dangerous Waste Training Plan (DWTP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SIMMONS, F.M.

    2000-03-29

    This Waste Encapsulation Storage Facility (WESF) Dangerous Waste Training Plan (DWTP) applies to personnel who perform work at, or in support of WESF. The plan, along with the names of personnel, may be given to a regulatory agency inspector upon request. General workers, subcontractors, or visiting personnel who have not been trained in the management of dangerous wastes must be accompanied by an individual who meets the requirements of this training plan. Dangerous waste management includes handling, treatment, storage, and/or disposal of dangerous and/or mixed waste. Dangerous waste management units covered by this plan include: less-than-90-day accumulation area(s); pool cellsmore » 1-8 and 12 storage units; and process cells A-G storage units. This training plan describes general requirements, worker categories, and provides course descriptions for operation of the WESF permitted miscellaneous storage units and the Less-than-90-Day Accumulation Areas.« less

  18. Continuity of operations planning in college athletic programs: The case for incorporating Federal Emergency Management Guidelines.

    PubMed

    Hall, Stacey A; Allen, Brandon L; Phillips, Dennis

    2016-01-01

    College athletic departments have a responsibility to provide a safe environment for student-athletes; however, most colleges do not have a crisis management plan that includes procedures for displaced student-athletes or alternate facilities to perform athletic events. Continuity of operations planning ensures athletic programs are equipped to maintain essential functions during, or shortly after, a disruption of operations due to possible hazards. Previous studies have identified a lack of emergency preparedness and continuity planning in college athletic departments. The purpose of this article is to illustrate in detail one approach to disaster planning for college athletic departments, namely the Federal Emergency Management Agency (FEMA) continuity of operations framework. By adhering to FEMA guidelines and promoting a best practices model, athletic programs can effectively plan to address potential hazards, as well as protect the organization's brand, image, and financial sustainability after a crisis event.

  19. Thriving and Not Just Surviving: New Directions for Tomorrow's Performance-Improvement Managers.

    ERIC Educational Resources Information Center

    Kaufman, Roger

    2000-01-01

    Examines popular approaches to performance and organizational improvement to see what flaws they contain and how continued practice will impede progress. Discusses benchmarking; quality management/continuous improvement; needs assessment; training; downsizing; reengineering; system(s) approach; and strategic planning. Describes the Organizational…

  20. The impact of health plan delivery system organization on clinical quality and patient satisfaction.

    PubMed

    Gillies, Robin R; Chenok, Kate Eresian; Shortell, Stephen M; Pawlson, Gregory; Wimbush, Julian J

    2006-08-01

    The purpose of this study was to examine the extent to which measures of health plan clinical performance and measures of patient perceptions of care are associated with health plan organizational characteristics, including the percentage of care provided based on a group or staff model delivery system, for-profit (tax) status, and affiliation with a national managed care firm. Data describing health plans on region, age of health plan, for-profit status, affiliation with a national managed care firm, percentage of Medicare business, total enrollment, ratio of primary care physicians to specialists, HMO penetration, and form of health care delivery system (e.g., IPA, network, mixed, staff, group) were obtained from InterStudy. Clinical performance measures for women's health screening rates, child and adolescent immunization rates, heart disease screening rates, diabetes screening rates, and smoking cessation were developed from HEDIS data. Measures of patient perceptions of care are obtained from CAHPS survey data submitted as Healthplan Employer Data and Information Set, Consumer Assessment of Health Plans 2.0 H. Multivariate regression cross-sectional analysis of 272 health plans was used to evaluate the relationship of health plan characteristics with measures of clinical performance and patient perceptions of care. The form of delivery system, measured by percent of care delivered by staff and group model systems, is significantly related (p < or = .05) with four of the five clinical performance indices but none of the three satisfaction performance indices. Other variables significantly associated with performance were being geographically located in the Northeast, having nonprofit status, and for patient satisfaction, not being part of a larger insurance company. These comparative results provide evidence suggesting that the type of delivery system used by health plans is related to many clinical performance measures but is not related to patient perceptions of care. These findings underscore the importance of the form of the delivery system and the need for further inquiry that examines the relationship between organizational form and performance.

  1. Quantification of the benefits of access management for Kentucky : final report.

    DOT National Transportation Integrated Search

    2006-07-01

    This report describes the benefits quantification performed for the proposed access management plan for Kentucky. This study evaluates the capacity, safety and economic impacts associated with access management programs. The proposed Kentucky access ...

  2. Chronic Fatigue Syndrome in Gulf War Veterans

    MedlinePlus

    ... Performance VA Plans, Budget, & Performance VA Center for Innovation (VACI) Agency Financial Report ... Management Services Veterans Service Organizations Office of Accountability & Whistleblower ...

  3. Women Veterans Health Care: Frequently Asked Questions

    MedlinePlus

    ... Performance VA Plans, Budget, & Performance VA Center for Innovation (VACI) Agency Financial Report ... Management Services Veterans Service Organizations Office of Accountability & Whistleblower ...

  4. Risk Management for Human Support Technology Development

    NASA Technical Reports Server (NTRS)

    jones, Harry

    2005-01-01

    NASA requires continuous risk management for all programs and projects. The risk management process identifies risks, analyzes their impact, prioritizes them, develops and carries out plans to mitigate or accept them, tracks risks and mitigation plans, and communicates and documents risk information. Project risk management is driven by the project goal and is performed by the entire team. Risk management begins early in the formulation phase with initial risk identification and development of a risk management plan and continues throughout the project life cycle. This paper describes the risk management approach that is suggested for use in NASA's Human Support Technology Development. The first step in risk management is to identify the detailed technical and programmatic risks specific to a project. Each individual risk should be described in detail. The identified risks are summarized in a complete risk list. Risk analysis provides estimates of the likelihood and the qualitative impact of a risk. The likelihood and impact of the risk are used to define its priority location in the risk matrix. The approaches for responding to risk are either to mitigate it by eliminating or reducing the effect or likelihood of a risk, to accept it with a documented rationale and contingency plan, or to research or monitor the risk, The Human Support Technology Development program includes many projects with independently achievable goals. Each project must do independent risk management, considering all its risks together and trading them against performance, budget, and schedule. Since the program can succeed even if some projects fail, the program risk has a complex dependence on the individual project risks.

  5. Planning and managing future space facility projects. [management by objectives and group dynamics

    NASA Technical Reports Server (NTRS)

    Sieber, J. E.; Wilhelm, J. A.; Tanner, T. A.; Helmreich, R. L.; Burgenbauch, S. F.

    1979-01-01

    To learn how ground-based personnel of a space project plan and organize their work and how such planning and organizing relate to work outcomes, longitudinal study of the management and execution of the Space Lab Mission Development Test 3 (SMD 3) was performed at NASA Ames Research Center. A view of the problems likely to arise in organizations and some methods of coping with these problems are presented as well as the conclusions and recommendations that pertain strictly to SMD 3 management. Emphasis is placed on the broader context of future space facility projects and additional problems that may be anticipated. A model of management that may be used to facilitate problem solving and communication - management by objectives (MBO) is presented. Some problems of communication and emotion management that MBO does not address directly are considered. Models for promoting mature, constructive and satisfying emotional relationships among group members are discussed.

  6. Developing a planning model to estimate future cash flows.

    PubMed

    Barenbaum, L; Monahan, T F

    1988-03-01

    Financial managers are discovering that net income and other traditional measures of cash flow may not provide them with the flexibility needed for comprehensive internal planning and control. By using a discretionary cash flow model, financial managers have a forecasting tool that can help them measure anticipated cash flows, and make better decisions concerning financing alternatives, capital expansion, and performance appraisal.

  7. NOSC (Naval Ocean Systems Center) Program Manager’s Handbook.

    DTIC Science & Technology

    1986-07-01

    impact downstream on other obligations-can wreck the best program through loss of performance, credibility, sponsorship, and future opportunity...planning sessions should be alert to external constraints that may impact on the timely completion of the project. Networking, through planning sessions...schedule, will have significant impact on the project. One of the most important functions of project management

  8. Driving Safely into the Future with Applied Technology

    DOT National Transportation Integrated Search

    2013-06-19

    This report highlights key recommendations and noteworthy practices identified at the peer exchange on Introducing Performance Management into the Metropolitan Planning Organization (MPO) Planning Process held on June, 19, 2013 in Bismarck, Nor...

  9. 5 CFR 9901.401 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... between the performance management system and DoD's strategic plan; (4) A means for ensuring employee... Administrative Personnel DEPARTMENT OF DEFENSE HUMAN RESOURCES MANAGEMENT AND LABOR RELATIONS SYSTEMS (DEPARTMENT OF DEFENSE-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF DEFENSE NATIONAL SECURITY PERSONNEL SYSTEM...

  10. 5 CFR 9901.401 - Purpose.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... between the performance management system and DoD's strategic plan; (4) A means for ensuring employee... Administrative Personnel DEPARTMENT OF DEFENSE HUMAN RESOURCES MANAGEMENT AND LABOR RELATIONS SYSTEMS (DEPARTMENT OF DEFENSE-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF DEFENSE NATIONAL SECURITY PERSONNEL SYSTEM...

  11. The key to successful management of STS operations: An integrated production planning system

    NASA Technical Reports Server (NTRS)

    Johnson, W. A.; Thomasen, C. T.

    1985-01-01

    Space Transportation System operations managers are being confronted with a unique set of challenges as a result of increasing flight rates, the demand for flight manifest/production schedule flexibility and an emphasis on continued cost reduction. These challenges have created the need for an integrated production planning system that provides managers with the capability to plan, schedule, status and account for an orderly flow of products and services across a large, multi-discipline organization. With increased visibility into the end-to-end production flow for individual and parallel missions in process, managers can assess the integrated impact of changes, identify and measure the interrelationships of resource, schedule, and technical performance requirements and prioritize productivity enhancements.

  12. Nonprice competition and quality of care in managed care: the New York SCHIP market.

    PubMed

    Liu, Hangsheng; Phelps, Charles E

    2008-06-01

    To examine the effect of nonprice competition among managed care plans on the quality of care in the New York SCHIP market. U.S. Census 2000; 2002 New York State Managed Care Plan Performance Report; and 2001 New York State Managed Care Annual Enrollment Report. Each market is defined as a county, and competition is measured as the number of plans in a market. Quality of care is measured in percentages using three Consumer Assessment of Health Plans Survey and three Health Plan Employer Data and Information Set scores. Two-stage least squares is applied to address the endogeneity between competition and the quality of care, using population as an instrument. We find a negative association between competition and quality of care. An additional managed care plan is significantly associated with a decrease of 0.40-2.31 percentage points in four out of six quality measures. After adjusting for production cost, a positive correlation is observed between price and quality measures across different pricing regions. It seems likely that pricing policy is a constraint on quality production, although it may not be interpreted as a causal relationship and further study is needed.

  13. Training hospital managers for strategic planning and management: a prospective study.

    PubMed

    Terzic-Supic, Zorica; Bjegovic-Mikanovic, Vesna; Vukovic, Dejana; Santric-Milicevic, Milena; Marinkovic, Jelena; Vasic, Vladimir; Laaser, Ulrich

    2015-02-26

    Training is the systematic acquisition of skills, rules, concepts, or attitudes and is one of the most important components in any organization's strategy. There is increasing demand for formal and informal training programs especially for physicians in leadership positions. This study determined the learning outcomes after a specific training program for hospital management teams. The study was conducted during 2006 and 2007 at the Centre School of Public Health and Management, Faculty of Medicine, University of Belgrade and included 107 participants involved in the management in 20 Serbian general hospitals. The management teams were multidisciplinary, consisting of five members on average: the director of the general hospital, the deputy directors, the head nurse, and the chiefs of support services. The managers attended a training program, which comprised four modules addressing specific topics. Three reviewers independently evaluated the level of management skills at the beginning and 12 months after the training program. Principal component analysis and subsequent stepwise multiple linear regression analysis were performed to determine predictors of learning outcomes. The quality of the SWOT (strengths, weaknesses, opportunities and threats) analyses performed by the trainees improved with differences between 0.35 and 0.49 on a Likert scale (p < 0.001). Principal component analysis explained 81% of the variance affecting their quality of strategic planning. Following the training program, the external environment, strategic positioning, and quality of care were predictors of learning outcomes. The four regression models used showed that the training program had positive effects (p < 0.001) on the ability to formulate a Strategic Plan comprising the hospital mission, vision, strategic objectives, and action plan. This study provided evidence that training for strategic planning and management enhanced the strategic decision-making of hospital management teams, which is a requirement for hospitals in an increasingly competitive, complex and challenging context. For the first time, half of state general hospitals involved in team training have formulated the development of an official strategic plan. The positive effects of the formal training program justify additional investment in future education and training.

  14. Strategic Planning in an Educational Development Centre: Motivation, Management, and Messiness

    ERIC Educational Resources Information Center

    Albon, Simon P.; Iqbal, Isabeau; Pearson, Marion L.

    2016-01-01

    Strategic planning in universities is frequently positioned as vital for clarifying future directions, providing a coherent basis for decision-making, establishing priorities, and improving organizational performance. Models for successful strategic planning abound and often present the process as linear and straightforward. In this essay, we…

  15. 40 CFR 60.2615 - What must I do if I plan to permanently close my CISWI unit and not restart it?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emissions Guidelines and Compliance Times for Commercial and Industrial Solid Waste Incineration Units Model... plan is due. Model Rule—Waste Management Plan ...

  16. 40 CFR 60.2615 - What must I do if I plan to permanently close my CISWI unit and not restart it?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emissions Guidelines and Compliance Times for Commercial and Industrial Solid Waste Incineration Units Model... plan is due. Model Rule—Waste Management Plan ...

  17. Applicability Evaluation of Job Standards for Diabetes Nutritional Management by Clinical Dietitian.

    PubMed

    Baek, Young Jin; Oh, Na Gyeong; Sohn, Cheong-Min; Woo, Mi-Hye; Lee, Seung Min; Ju, Dal Lae; Seo, Jung-Sook

    2017-04-01

    This study was conducted to evaluate applicability of job standards for diabetes nutrition management by hospital clinical dietitians. In order to promote the clinical nutrition services, it is necessary to present job standards of clinical dietitian and to actively apply these standardized tasks to the medical institution sites. The job standard of clinical dietitians for diabetic nutrition management was distributed to hospitals over 300 beds. Questionnaire was collected from 96 clinical dietitians of 40 tertiary hospitals, 47 general hospitals, and 9 hospitals. Based on each 5-point scale, the importance of overall duty was 4.4 ± 0.5, performance was 3.6 ± 0.8, and difficulty was 3.1 ± 0.7. 'Nutrition intervention' was 4.5 ± 0.5 for task importance, 'nutrition assessment' was 4.0 ± 0.7 for performance, and 'nutrition diagnosis' was 3.4 ± 0.9 for difficulty. These 3 items were high in each category. Based on the grid diagram, the tasks of both high importance and high performance were 'checking basic information,' 'checking medical history and therapy plan,' 'decision of nutritional needs,' 'supply of foods and nutrients,' and 'education of nutrition and self-management.' The tasks with high importance but low performance were 'derivation of nutrition diagnosis,' 'planning of nutrition intervention,' 'monitoring of nutrition intervention process.' The tasks of both high importance and high difficulty were 'derivation of nutrition diagnosis,' 'planning of nutrition intervention,' 'supply of foods and nutrients,' 'education of nutrition and self-management,' and 'monitoring of nutrition intervention process.' The tasks of both high performance and high difficulty were 'documentation of nutrition assessment,' 'supply of foods and nutrients,' and 'education of nutrition and self-management.'

  18. Idaho National Laboratory Integrated Safety Management System FY 2013 Effectiveness Review and Declaration Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hunt, Farren

    2013-12-01

    Idaho National Laboratory (INL) performed an Annual Effectiveness Review of the Integrated Safety Management System (ISMS), per 48 Code of Federal Regulations (CFR) 970.5223 1, “Integration of Environment, Safety and Health into Work Planning and Execution.” The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and identified target areas for focused improvements and assessments for Fiscal Year (FY) 2014. Results of the FY 2013 annual effectiveness review demonstrate that the INL’s ISMS program is “Effective” and continually improving and shows signs of being significantly strengthened. Although there have been unacceptable serious events in themore » past, there has also been significant attention, dedication, and resources focused on improvement, lessons learned and future prevention. BEA’s strategy of focusing on these improvements includes extensive action and improvement plans that include PLN 4030, “INL Sustained Operational Improvement Plan, PLN 4058, “MFC Strategic Excellence Plan,” PLN 4141, “ATR Sustained Excellence Plan,” and PLN 4145, “Radiological Control Road to Excellence,” and the development of LWP 20000, “Conduct of Research.” As a result of these action plans, coupled with other assurance activities and metrics, significant improvement in operational performance, organizational competence, management oversight and a reduction in the number of operational events is being realized. In short, the realization of the fifth core function of ISMS (feedback and continuous improvement) and the associated benefits are apparent.« less

  19. The strategic skills of business continuity managers: putting business continuity management into corporate long-term planning.

    PubMed

    Wong, Wei Ning Zechariah

    2009-11-01

    Despite its rapid development in the last two decades, business continuity management (BCM) as a discipline and a profession is still regarded by many as an operational entity of management. Two main issues are discussed in this paper: the role of BCM in strategic management and the strategic skills of business continuity managers. These issues are crucial as they represent the role of BCM in high-level corporate management. The paper discusses the importance of BCM in the long-term planning of organisational success and the preservation of future competitiveness. Finally, salient points that underpin the importance of its role in sustaining organisational performance are addressed.

  20. Management information systems in the HMO environment.

    PubMed

    Neal, P A

    1982-01-01

    Realization of the unique potential of a health maintenance organization is dependent on the availability of adequate, accurate, and timely information. The particular data needed are determined by the structure of the organization; the physician compensation plans; requirements for state, federal, or other reporting; and many other factors. The author introduces the concept and objectives of the HMO, and presents the management information systems necessary for planning and monitoring HMO performance: patient information, utilization information, and management information for the staff and nonstaff HMO.

  1. Description of the computations and pilot procedures for planning fuel-conservative descents with a small programmable calculator

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vicroy, D.D.; Knox, C.E.

    A simplified flight management descent algorithm was developed and programmed on a small programmable calculator. It was designed to aid the pilot in planning and executing a fuel conservative descent to arrive at a metering fix at a time designated by the air traffic control system. The algorithm may also be used for planning fuel conservative descents when time is not a consideration. The descent path was calculated for a constant Mach/airspeed schedule from linear approximations of airplane performance with considerations given for gross weight, wind, and nonstandard temperature effects. The flight management descent algorithm and the vertical performance modelingmore » required for the DC-10 airplane is described.« less

  2. Planning Management Training Programs for Organizational Development

    ERIC Educational Resources Information Center

    Alpander, Guvenc G.

    1974-01-01

    To investigate means of converting management development programs into a successful organizational development process, managers' attitudes toward centralization and decentralization of functions and decisions, the importance of performed functions, their personal effectiveness, their managerial style, and what they prefer for executive…

  3. Projecting technology change to improve space technology planning and systems management

    NASA Astrophysics Data System (ADS)

    Walk, Steven Robert

    2011-04-01

    Projecting technology performance evolution has been improving over the years. Reliable quantitative forecasting methods have been developed that project the growth, diffusion, and performance of technology in time, including projecting technology substitutions, saturation levels, and performance improvements. These forecasts can be applied at the early stages of space technology planning to better predict available future technology performance, assure the successful selection of technology, and improve technology systems management strategy. Often what is published as a technology forecast is simply scenario planning, usually made by extrapolating current trends into the future, with perhaps some subjective insight added. Typically, the accuracy of such predictions falls rapidly with distance in time. Quantitative technology forecasting (QTF), on the other hand, includes the study of historic data to identify one of or a combination of several recognized universal technology diffusion or substitution patterns. In the same manner that quantitative models of physical phenomena provide excellent predictions of system behavior, so do QTF models provide reliable technological performance trajectories. In practice, a quantitative technology forecast is completed to ascertain with confidence when the projected performance of a technology or system of technologies will occur. Such projections provide reliable time-referenced information when considering cost and performance trade-offs in maintaining, replacing, or migrating a technology, component, or system. This paper introduces various quantitative technology forecasting techniques and illustrates their practical application in space technology and technology systems management.

  4. Strategic management system in a healthcare setting--moving from strategy to results.

    PubMed

    Devitt, Rob; Klassen, Wolf; Martalog, Julian

    2005-01-01

    One of the historical challenges in the healthcare system has been the identification and collection of meaningful data to measure an organization's progress towards the achievement of its strategic goals and the concurrent alignment of internal operating practices with this strategy. Over the last 18 months the Toronto East General Hospital (TEGH) has adopted a strategic management system and organizing framework that has led to a metric-based strategic plan. It has allowed for formal and measurable linkages across a full range of internal business processes, from the annual operating plan to resource allocation decisions, to the balanced scorecard and individual performance evaluations. The Strategic Management System (SMS) aligns organizational planning and performance measurement, facilitates an appropriate balance between organizational priorities and resolving "local" problems, and encourages behaviours that are consistent with the values upon which the organization is built. The TEGH Accountability Framework serves as the foundation for the entire system. A key tool of the system is the rolling three-year strategic plan for the organization that sets out specific annual improvement targets on a number of key strategic measures. Individual program/department plans with corresponding measures ensure that the entire organization is moving forward strategically. Each year, all plans are reviewed, with course adjustments made to reflect changes in the hospital's environment and with re-calibration of performance targets for the next three years to ensure continued improvement and organizational progress. This system has been used through one annual business cycle. Results from the past year show measurable success. The hospital has improved on 12 of the 15 strategic plan metrics, including achieving the targeted 1% operating surplus while operating in an environment of tremendous change and uncertainty. This article describes the strategic management system used at TEGH and demonstrates the formal integration of the plan into its operating and decision making processes. It also provides examples of the metrics, their use in decision-making and the variance reporting and improvement mechanisms. The article also demonstrates that a measurement-oriented approach to the planning and delivery of community hospital service is both achievable and valuable in terms of accountability and organizational responsiveness.

  5. Overview of Management Theory

    DTIC Science & Technology

    1991-02-01

    theory orients command leadership for the enormous task of managing organizations in our environment fraught with volatility, uncertainty...performance and organizational ethics. A THEORY OF MANAGEMENT BACKGROUND BASIC MANAGEMENT BEHAVIORAL Definitions FUNCTIONS ASPECTS History Planning Leadership ...the best way to manage in their theory of managerial leadership . To them, the 9,9 position on their model, "is acknowledged by managers as the

  6. 40 CFR 60.2625 - When must I submit my waste management plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emissions Guidelines and Compliance Times for Commercial and Industrial Solid Waste Incineration Units Model Rule-Waste Management...

  7. 40 CFR 60.2625 - When must I submit my waste management plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emissions Guidelines and Compliance Times for Commercial and Industrial Solid Waste Incineration Units Model Rule-Waste Management...

  8. Making Connections between the Appraisal, Performance Management and Professional Development of Dentists and Teachers: "Right, What Are the Problems We've Got and How Could We Sort This Out?'"

    ERIC Educational Resources Information Center

    Butt, Graham; Macnab, Natasha

    2013-01-01

    Evaluating the connections between the appraisal, or performance management, of different professional groups, and their subsequent uptake of continuing professional development (CPD), is valuable for both employees and managers. The linking of appraisal systems with professional/personal development plans amongst health professionals is now…

  9. FAA airborne data link human factors research plan

    DOT National Transportation Integrated Search

    1993-07-01

    This report contains a five-year plan to perform research of human factors issues and topics : related to Data Link implementations in general aviation and transport category aircraft. : Elements such as resource allocation and management and coordin...

  10. Organizational Downsizing and Career Development.

    ERIC Educational Resources Information Center

    Bozionelos, Nikos

    2001-01-01

    A study of 123 "survivors" of corporate downsizing and 13 senior managers indicated that the organization lacked a coherent career development plan and the performance management/appraisal process was inadequate. Managers perceived lateral transfers as effective; some employees felt they undermined career progression. Employees thought…

  11. 10 CFR 1.31 - Office of the Chief Financial Officer.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... planning, budgeting, and performance management process; (f) Develops and maintains an integrated agency accounting and financial management system, including an accounting system, and financial reporting and...— (a) Oversees all financial management activities relating to NRC's programs and operations and...

  12. 10 CFR 1.31 - Office of the Chief Financial Officer.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... planning, budgeting, and performance management process; (f) Develops and maintains an integrated agency accounting and financial management system, including an accounting system, and financial reporting and...— (a) Oversees all financial management activities relating to NRC's programs and operations and...

  13. 10 CFR 1.31 - Office of the Chief Financial Officer.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... planning, budgeting, and performance management process; (f) Develops and maintains an integrated agency accounting and financial management system, including an accounting system, and financial reporting and...— (a) Oversees all financial management activities relating to NRC's programs and operations and...

  14. 10 CFR 1.31 - Office of the Chief Financial Officer.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... planning, budgeting, and performance management process; (f) Develops and maintains an integrated agency accounting and financial management system, including an accounting system, and financial reporting and...— (a) Oversees all financial management activities relating to NRC's programs and operations and...

  15. [Operational costs and control of performance in surgical clinics between marketing and planning economics. Risk or perhaps quadrature of the circle].

    PubMed

    Kraus, T W; Weber, W; Mieth, M; Funk, H; Klar, E; Herfarth, C

    2000-03-01

    Surgical hospitals can be seen as operational or even industrial production systems. Doctors have a major impact on both medical performance and costs. For active participation in the management process, knowledge of industrial controlling mechanisms is required. German hospitals currently receive no procedure-related financial revenues, such as prices or tariffs for defined medical treatment activities. Maximum clinical revenues are, furthermore, limited by principles of planned economy and can be increased only slightly by greater medical performance. Costs are the only target that can be autonomously influenced by the management. Operative controlling in hospitals aims at horizontal and vertical coordination of subunits and decentralization of process regulations. Hospital medical performance is not clearly defined, its quantitative measurement very problematic. Process-orientated clinical activities are not taken into account. A high percentage of hospital costs are fixed and can be influenced only by major structural interventions in the long term. Variable costs are primarily dependent on the quantity of clinical activities, but also heavily influenced by patient structure (comorbidity and risk profile). The various forms of industrial cost calculations, such as internal budgeting, internal markets or flexible plan-cost balancing, cannot be directly applied in hospital management. Based on these analyses, current operational concepts and strategic trends are listed to describe cost-management options in hospitals with focus on the German health reforms.

  16. Improve strategic supplier performance using DMAIC to develop a Quality Improvement Plan

    NASA Astrophysics Data System (ADS)

    Jardim, Kevin P.

    Supplier performance that meets the requirements of the customer has long plagued quality professionals. Despite the vast efforts by organizations to improve supplier performance, little has been done to standardize the plan to improve performance. This project presents a guideline and problem-solving strategy using a Define, Measure, Analyze, Improve, and Control (DMAIC) structured tool that will assist in the management and improvement of supplier performance. An analysis of benchmarked Quality Improvement Plans indicated that this topic needs more focus on how to accomplish improved supplier performance. This project is part of a growing body of supplier continuous improvement efforts. With the input of Zodiac Aerospace quality professionals this project's results provide a solution to Quality Improvement Plans and show objective evidence of its benefits. This project contributes to the future research on similar topics.

  17. A Study of the Access to the Scholarly Record from a Hospital Health Science Core Collection *

    PubMed Central

    Williams, James F.; Pings, Vern M.

    1973-01-01

    This study is an effort to determine possible service performance levels in hospital libraries based on access to the scholarly record of medicine through selected lists of clinical journals and indexing and abstracting journals. The study was designed to test a methodology as well as to provide data for planning and management decisions for health science libraries. Findings and conclusions cover the value of a core collection of journals, length of journal files, performance of certain bibliographic instruments in citation verification, and the implications of study data for library planning and management. PMID:4744345

  18. Infectious Diseases - Diseases Related to Service in Gulf War, Iraq, and Afghanistan

    MedlinePlus

    ... Performance VA Plans, Budget, & Performance VA Center for Innovation (VACI) Agency Financial Report ... Management Services Veterans Service Organizations Office of Accountability & Whistleblower ...

  19. Social Impact Management Plans: Innovation in corporate and public policy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Franks, Daniel M., E-mail: d.franks@uq.edu.au; Vanclay, Frank, E-mail: frank.vanclay@rug.nl

    Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes – assessment, management and monitoring – to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples aremore » analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs. -- Highlights: • Social impact management plans are effective strategies to manage social issues. • They are developed in partnership with regulatory agencies, investors and community. • SIMPs link assessment to ongoing management and address social and community issues. • SIMPs clarify responsibilities in the management of impacts, opportunities and risks. • SIMPs demonstrate a shift to include management as a core component of SIA practice.« less

  20. Improving the Performance of Highly Constrained Water Resource Systems using Multiobjective Evolutionary Algorithms and RiverWare

    NASA Astrophysics Data System (ADS)

    Smith, R.; Kasprzyk, J. R.; Zagona, E. A.

    2015-12-01

    Instead of building new infrastructure to increase their supply reliability, water resource managers are often tasked with better management of current systems. The managers often have existing simulation models that aid their planning, and lack methods for efficiently generating and evaluating planning alternatives. This presentation discusses how multiobjective evolutionary algorithm (MOEA) decision support can be used with the sophisticated water infrastructure model, RiverWare, in highly constrained water planning environments. We first discuss a study that performed a many-objective tradeoff analysis of water supply in the Tarrant Regional Water District (TRWD) in Texas. RiverWare is combined with the Borg MOEA to solve a seven objective problem that includes systemwide performance objectives and individual reservoir storage reliability. Decisions within the formulation balance supply in multiple reservoirs and control pumping between the eastern and western parts of the system. The RiverWare simulation model is forced by two stochastic hydrology scenarios to inform how management changes in wet versus dry conditions. The second part of the presentation suggests how a broader set of RiverWare-MOEA studies can inform tradeoffs in other systems, especially in political situations where multiple actors are in conflict over finite water resources. By incorporating quantitative representations of diverse parties' objectives during the search for solutions, MOEAs may provide support for negotiations and lead to more widely beneficial water management outcomes.

  1. 78 FR 5855 - Agency Information Collection Activities: Requests for Comments; Clearance of Renewed Approval of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ... collects information from airport sponsors and planning agencies in order to administer the Airports Grants... funding for airport planning and development projects at airports included in the National Plan of... of 49 CFR 18 for financial management and performance monitoring. Information is collected in the...

  2. 7 CFR 761.10 - Planning and performing construction and other development.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the Agency with an estimate of the total cash cost of all planned development prior to loan approval; (2) Must show proof of sufficient funds to pay for the total cash cost of all planned development at... regulations, including building, plumbing, mechanical, electrical, water, and waste management. (4) The Agency...

  3. Business Plan for the Southwest Regional Spaceport: Executive Summary

    NASA Technical Reports Server (NTRS)

    1997-01-01

    A proposal for a commercial, full-service launch, tracking, and recovery complex for Reusable Launch Vehicles in New Mexico is presented. Vision, mission, business definition, competitive advantages, and business approach are formulated. Management plan and team structure are detailed, and anticipated market is described. Finance and marketing plans are presented. Financial analysis is performed.

  4. [Managerial performance in public health services: a case study in Mato Grosso do Sul, Brazil].

    PubMed

    Barbieri, Ana Rita; Hortale, Virginia Alonso

    2005-01-01

    This paper presents part of a doctoral dissertation that developed a theoretical model capable of identifying managerial performance in various administrative levels of a Municipal Health Secretariat. The methodology was a case study of the Municipal Health Secretariat in Campo Grande, capital of the State of Mato Grosso do Sul, Brazil. The theoretical model was based on recent debates emphasizing the need to modernize public administration, with an emphasis on efficacy and efficiency in the organizations as a whole. Some 31 interviews were conducted with the objective of identifying the managers' performance, through questions based on their daily practices in planning, organization, direction, and control. Managers from higher hierarchical levels obtained better results, while those in basic health units generally developed activities and complied with decisions passed down by imposition, with limited capacity to plan, organize, or control activities pertaining to their management sphere. These results stem partially from the charismatic leadership and centralizing administration of the current management in the municipal health system.

  5. 77 FR 36577 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Tax...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-19

    ... PERFORMS, the performance management system for the UI program. UI PERFORMS incorporates a strategic planning process of identifying priorities; ongoing collection and monitoring of valid data to measure...

  6. Elevating the role of finance at Mary Lanning Healthcare.

    PubMed

    Hoffman, Amanda; Spence, Jay

    2013-11-01

    To effectively partner with hospital operations leaders, healthcare finance leaders should: Streamline and align financial planning and budgeting functions across the organization; Ensure capital planning is regarded as a strategic process; Optimize performance monitoring across management levels.

  7. Resource Management in the Microgravity Science Division

    NASA Technical Reports Server (NTRS)

    Casselle, Justine

    2004-01-01

    In the Microgravity Science Division, the primary responsibilities of the Business Management Office are resource management and data collection. Resource management involves working with a budget to do a number of specific projects, while data collection involves collecting information such as the status of projects and workforce hours. This summer in the Business Management Office I assisted Margie Allen with resource planning and the implementation of specific microgravity projects. One of the main duties of a Project Control Specialists, such as my mentor, is to monitor and analyze project manager s financial plans. Project managers work from the bottom up to determine how much money their project will cost. They then set up a twelve month operating plan which shows when money will be spent. I assisted my mentor in checking for variances in her data against those of the project managers. In order to successfully check for those variances, we had to understand: where the project is including plans vs. actual performance, why it is in its present condition, and what the future impact will be based on known budgetary parameters. Our objective was to make sure that the plan, or estimated resources input, are a valid reflection of the actual cost. To help with my understanding of the process, over the course of my tenure I had to obtain skills in Microsoft Excel and Microsoft Access.

  8. Short-term forecasting tools for agricultural nutrient management

    USDA-ARS?s Scientific Manuscript database

    The advent of real time/short term farm management tools is motivated by the need to protect water quality above and beyond the general guidance offered by existing nutrient management plans. Advances in high performance computing and hydrologic/climate modeling have enabled rapid dissemination of ...

  9. The experience of an information system for nursing practice: the importance of nursing records in the management of a care plan.

    PubMed

    Nunes, Sofia R T; Rego, Guilhermina; Nunes, Rui

    2014-07-01

    Health information systems are becoming common because they are important tools to support decision making and assist nurses in their daily interventions. The Information System for Nursing Practice promotes consistent nursing records, as it is directed to the nursing practice and process. The aims of this study were to identify and describe the most frequent type of nursing actions in the care plan for a patient after acute myocardial infarction, considering the seven-axis model of the International Classification of Nursing Practice and the rate of health education given to patients during hospitalization. A cross-sectional analysis was performed retrospectively by searching the computerized database of the Information System for Nursing Practice. We verified some gaps in information with regard to unidentified records of diagnoses and interventions. During hospitalization, the most used interventions were in the fields of observing (40%) and managing (23%). Interventions associated with management of signs and symptoms were more frequent and were performed in 84.9% of the patients. In the field of informing, health education in relation to diet was performed in 21.7% of the patients; exercise, in 16%; and tobacco, in 11.3%. The use of nursing records and information systems can improve nursing care coordination and care plan management.

  10. Interval Management: Development and Implementation of an Airborne Spacing Concept

    NASA Technical Reports Server (NTRS)

    Barmore, Bryan E.; Penhallegon, William J.; Weitz, Lesley A.; Bone, Randall S.; Levitt, Ian; Flores Kriegsfeld, Julia A.; Arbuckle, Doug; Johnson, William C.

    2016-01-01

    Interval Management is a suite of ADS-B-enabled applications that allows the air traffic controller to instruct a flight crew to achieve and maintain a desired spacing relative to another aircraft. The flight crew, assisted by automation, manages the speed of their aircraft to deliver more precise inter-aircraft spacing than is otherwise possible, which increases traffic throughput at the same or higher levels of safety. Interval Management has evolved from a long history of research and is now seen as a core NextGen capability. With avionics standards recently published, completion of an Investment Analysis Readiness Decision by the FAA, and multiple flight tests planned, Interval Management will soon be part of everyday use in the National Airspace System. Second generation, Advanced Interval Management capabilities are being planned to provide a wider range of operations and improved performance and benefits. This paper briefly reviews the evolution of Interval Management and describes current development and deployment plans. It also reviews concepts under development as the next generation of applications.

  11. Strategic Planning and Management in Defense Systems Acquisition

    DTIC Science & Technology

    2014-04-30

    Strategic planning, according to Dr. John Bryson (2010), offers many benefits to public-sector organizations:  Promotes strategic thinking, acting, and...planning in particular—and has proven its value (Barzelay & Campbell, 2003; Berman & West, 1998; Berry & Wechsler, 1995; Boyne & Gould-Williams, 2003...national survey. Public Administration Review, 55(2), 159–68. Boyne , G. A., & Gould-Williams, J. (2003). Planning and performance in public organizations

  12. The managed care contract: the blueprint for monitoring agreements.

    PubMed

    Hummel, J R; Cooper, S J

    2001-06-01

    Healthcare providers generally undertake monitoring programs of managed care arrangements as a way of analyzing financial performance, uncovering lapses in contractually mandated performance that might expose the organization to financial loss, and gathering information that can be helpful in renegotiating the contract or negotiating new arrangements. To secure access to the information needed to achieve these goals, the provider should ensure that the contract spells out the information required, the health plan's obligations to supply this information, and the consequences of the plan's failure to meet those obligations. Such consequences may include financial penalties for the plan and special termination rights for the provider. Without a contractually explicit assurance that the needed information will be available, a provider may find itself with no way to achieve its contract-monitoring goals.

  13. 40 CFR 270.230 - May I perform remediation waste management activities under a RAP at a location removed from the...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false May I perform remediation waste management activities under a RAP at a location removed from the area where the remediation wastes originated... Plans (RAPs) Obtaining A Rap for An Off-Site Location § 270.230 May I perform remediation waste...

  14. Primary and community care workforce planning and development.

    PubMed

    Hurst, Keith

    2006-09-01

    This article reports a study that provided primary and community care managers with information, allowing them to: (a) evaluate the size and mix of their workforce; and (b) develop knowledgeable and skilled teams to meet the demands of growing and changing services. Primary and community care services are growing in the United Kingdom, but workforce planning and development, despite their wide-ranging cost and quality implications, have not received the same attention. Indeed, most primary and community care workforce planning and development issues are universal. Demand 1-1 side workforce planning is concerned not only with the number, but also with staff mix; but how these autonomous and isolated practitioners spend their time is unique. The other side of the equation, workforce supply, raises many recruitment and retention challenges for managers in many countries. Any country's main workforce planning methods apply equally well to primary care, but each is flawed. A second, main problem is that the methods lead to fragmented services, whereas modern workforce planning methods should be multidisciplinary. Consequently, it has never been more important for managers to have data and algorithms to develop appropriate care teams. A large and versatile workforce database, profiling 304 English primary care trusts using demographic, socio-economic, mortality, morbidity, staffing and performance workforce-related variables, compiled in 2002 and updated yearly, is described. Data were supplemented with a systematic literature review leading to a 340-item annotated bibliography; and qualitative interviews with managers. Workforce size and mix are historical and irrational at best. Moreover, the number of variables that influence staffing is growing, thereby complicating workforce planning. Evaluating and adjusting the size and mix of teams using empirically determined community demand and performance variables based on the area's socio-economic characteristics is feasible.

  15. Nonprice Competition and Quality of Care in Managed Care: The New York SCHIP Market

    PubMed Central

    Liu, Hangsheng; Phelps, Charles E

    2008-01-01

    Objective To examine the effect of nonprice competition among managed care plans on the quality of care in the New York SCHIP market. Data Sources U.S. Census 2000; 2002 New York State Managed Care Plan Performance Report; and 2001 New York State Managed Care Annual Enrollment Report. Study Design Each market is defined as a county, and competition is measured as the number of plans in a market. Quality of care is measured in percentages using three Consumer Assessment of Health Plans Survey and three Health Plan Employer Data and Information Set scores. Two-stage least squares is applied to address the endogeneity between competition and the quality of care, using population as an instrument. Principle Findings We find a negative association between competition and quality of care. An additional managed care plan is significantly associated with a decrease of 0.40–2.31 percentage points in four out of six quality measures. After adjusting for production cost, a positive correlation is observed between price and quality measures across different pricing regions. Conclusions It seems likely that pricing policy is a constraint on quality production, although it may not be interpreted as a causal relationship and further study is needed. PMID:18454776

  16. Iranian Expert Opinion about Necessary Criteria for Hospitals Management Performance Assessments

    PubMed Central

    Dadgar, Elham; Janati, Ali; Tabrizi, Jafar Sadegh; Asghari-Jafarabadi, Mohammad; Barati, Omid

    2012-01-01

    Background: Managers in the hospital should have enough managerial skill to be coordinated with the complex environment. Defining a competency framework assessment for hospital man-agement will help to establish core competencies for hospital managers. The aim of this study was to develop concrete and suitable performance assessment criteria using expert's view. Methods: In this qualitative study in total, 20 professionals participated in the interview and Fo¬cus Group Discussions (FGD). Two of informants were interviewed and 18 professionals par¬ticipants in three focus group discussions. Discussions and interviews were well planned, the FGD environments were suitable and after interviews completion the notes were checked with participant for completeness. Thematic analysis method was used for the analysis of qualitative data. Results: Findings from 3 FGDs and 2 semi structured interviews done with 20 professionals were categorized accordance to themes. The findings were classified in 7 major and 41 sub themes. The major themes include competency related to planning, organization and staff per-formance management, leadership, information management, and clinical governance and per-formance indicators. Conclusion: All participants had hospital administration experience; so their explanation impor¬tant in identifying the criteria and developing hospital managers’ performance assessment tool. In addition to professional perspectives and studies done in other countries, in order to design this kind of tools, it is necessary to adopt the obtained findings to the local hospital conditions. PMID:24688938

  17. Development of transportation asset management decision support tools : final report.

    DOT National Transportation Integrated Search

    2017-08-09

    This study developed a web-based prototype decision support platform to demonstrate the benefits of transportation asset management in monitoring asset performance, supporting asset funding decisions, planning budget tradeoffs, and optimizing resourc...

  18. 5 CFR 370.102 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS INFORMATION TECHNOLOGY EXCHANGE... performance-related criteria established by the agency. Information technology (IT) management means the planning, organizing, staffing, directing, integrating, or controlling of information technology as defined...

  19. 5 CFR 370.102 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS INFORMATION TECHNOLOGY EXCHANGE... performance-related criteria established by the agency. Information technology (IT) management means the planning, organizing, staffing, directing, integrating, or controlling of information technology as defined...

  20. 20 CFR 633.203 - Review of funding request.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... SEASONAL FARMWORKER PROGRAMS Grant Planning and Application Procedures § 633.203 Review of funding request... farmworkers. (d) General administrative and financial management capability. (e) Prior performance with respect to financial management, audit and program outcomes. ...

  1. Achieving performance breakthroughs in an HMO business process through quality planning.

    PubMed

    Hanan, K B

    1993-01-01

    Kaiser Permanente's Georgia Region commissioned a quality planning team to design a new process to improve payments to its suppliers and vendors. The result of the team's effort was a 73 percent reduction in cycle time. This team's experiences point to the advantages of process redesign as a quality planning model, as well as some general guidelines for its most effective use in teams. If quality planning project teams are carefully configured, sufficiently expert in the existing process, and properly supported by management, organizations can achieve potentially dramatic improvements in process performance using this approach.

  2. Performance assessment through pre- and post-training evaluation of continuing medical education courses in prevention and management of cardio-vascular diseases in primary health care facilities of Armenia.

    PubMed

    Khachatryan, Lilit; Balalian, Arin

    2013-12-01

    To assess the difference of pre- and post-training performance evaluation of continuing medical education (CME) courses in cardio-vascular diseases (CVD) management among physicians at primary health care facilities of Armenian regions we conducted an evaluation survey. 212 medical records were surveyed on assessment of performance before and after the training courses through a self-employed structured questionnaire. Analysis of survey revealed statistically significant differences (p < 0.05) in a number of variables: threefold increased recording of lipids and body mass index (p = 0.001); moderate increased recording of comorbidities and aspirin prescription (p < 0.012); eightfold increased recording of dyslipidemia management plan, twofold increased recording for CVD management plan and fivefold increased recording for CVD absolute risk (p = 0.000). Missing records of electrocardiography and urine/creatinine analyses decreased statistically significantly (p < 0.05). Statistically significant decrease was observed in prescription of thiazides and angiotensin receptor blockers/angiotensin converting enzyme inhibitors (p < 0.005), while prescription of statins and statins with diet for dyslipidemia management showed increased recording (p < 0.05). Similarly, we observed increased records for counseling of rehabilitation physical activity (p = 0.006). In this survey most differences in pre- and post-evaluation of performance assessment may be explained by improved and interactive training modes, more advanced methods of demonstration of modeling. Current findings may serve a basis for future planning of CME courses for physicians of remote areas facing challenges in upgrading their knowledge, as well as expand the experience of performance assessment along with evaluation of knowledge scores.

  3. Battling Arrow's Paradox to Discover Robust Water Management Alternatives

    NASA Astrophysics Data System (ADS)

    Kasprzyk, J. R.; Reed, P. M.; Hadka, D.

    2013-12-01

    This study explores whether or not Arrow's Impossibility Theorem, a theory of social choice, affects the formulation of water resources systems planning problems. The theorem discusses creating an aggregation function for voters choosing from more than three alternatives for society. The Impossibility Theorem is also called Arrow's Paradox, because when trying to add more voters, a single individual's preference will dictate the optimal group decision. In the context of water resources planning, our study is motivated by recent theoretical work that has generalized the insights for Arrow's Paradox to the design of complex engineered systems. In this framing of the paradox, states of society are equivalent to water planning or design alternatives, and the voters are equivalent to multiple planning objectives (e.g. minimizing cost or maximizing performance). Seen from this point of view, multi-objective water planning problems are functionally equivalent to the social choice problem described above. Traditional solutions to such multi-objective problems aggregate multiple performance measures into a single mathematical objective. The Theorem implies that a subset of performance concerns will inadvertently dictate the overall design evaluations in unpredictable ways using such an aggregation. We suggest that instead of aggregation, an explicit many-objective approach to water planning can help overcome the challenges posed by Arrow's Paradox. Many-objective planning explicitly disaggregates measures of performance while supporting the discovery of the planning tradeoffs, employing multiobjective evolutionary algorithms (MOEAs) to find solutions. Using MOEA-based search to address Arrow's Paradox requires that the MOEAs perform robustly with increasing problem complexity, such as adding additional objectives and/or decisions. This study uses comprehensive diagnostic evaluation of MOEA search performance across multiple problem formulations (both aggregated and many-objective) to show whether or not aggregating performance measures biases decision making. In this study, we explore this hypothesis using an urban water portfolio management case study in the Lower Rio Grande Valley. The diagnostic analysis shows that modern self-adaptive MOEA search is efficient, effective, and reliable for the more complex many-objective LRGV planning formulations. Results indicate that although many classical water systems planning frameworks seek to account for multiple objectives, the common practice of reducing the problem into one or more highly aggregated performance measures can severely and negatively bias planning decisions.

  4. Planning and task management in Parkinson's disease: differential emphasis in dual-task performance.

    PubMed

    Bialystok, Ellen; Craik, Fergus I M; Stefurak, Taresa

    2008-03-01

    Seventeen patients diagnosed with Parkinson's disease completed a complex computer-based task that involved planning and management while also performing an attention-demanding secondary task. The tasks were performed concurrently, but it was necessary to switch from one to the other. Performance was compared to a group of healthy age-matched control participants and a group of young participants. Parkinson's patients performed better than the age-matched controls on almost all measures and as well as the young controls in many cases. However, the Parkinson's patients achieved this by paying relatively less attention to the secondary task and focusing attention more on the primary task. Thus, Parkinson's patients can apparently improve their performance on some aspects of a multidimensional task by simplifying task demands. This benefit may occur as a consequence of their inflexible exaggerated attention to some aspects of a complex task to the relative neglect of other aspects.

  5. Dynamic ambulance reallocation for the reduction of ambulance response times using system status management.

    PubMed

    Lam, Sean Shao Wei; Zhang, Ji; Zhang, Zhong Cheng; Oh, Hong Choon; Overton, Jerry; Ng, Yih Yng; Ong, Marcus Eng Hock

    2015-02-01

    Dynamically reassigning ambulance deployment locations throughout a day to balance ambulance availability and demands can be effective in reducing response times. The objectives of this study were to model dynamic ambulance allocation plans in Singapore based on the system status management (SSM) strategy and to evaluate the dynamic deployment plans using a discrete event simulation (DES) model. The geographical information system-based analysis and mathematical programming were used to develop the dynamic ambulance deployment plans for SSM based on ambulance calls data from January 1, 2011, to June 30, 2011. A DES model that incorporated these plans was used to compare the performance of the dynamic SSM strategy against static reallocation policies under various demands and travel time uncertainties. When the deployment plans based on the SSM strategy were followed strictly, the DES model showed that the geographical information system-based plans resulted in approximately 13-second reduction in the median response times compared to the static reallocation policy, whereas the mathematical programming-based plans resulted in approximately a 44-second reduction. The response times and coverage performances were still better than the static policy when reallocations happened for only 60% of all the recommended moves. Dynamically reassigning ambulance deployment locations based on the SSM strategy can result in superior response times and coverage performance compared to static reallocation policies even when the dynamic plans were not followed strictly. Copyright © 2014 Elsevier Inc. All rights reserved.

  6. Individual performance review in hospital practice: the development of a framework and evaluation of doctors' attitudes to its value and implementation.

    PubMed

    Trebble, T M; Cruickshank, L; Hockey, P M; Heyworth, N; Powell, T; Clarke, N

    2013-11-01

    Appraisal, or independent performance review (IPR) is used in human resources management in the commercial and public sectors to evaluate the performance of an employee against agreed local organisational expectations and objectives, and to identify their requirements for development and effective management. IPR for NHS consultants may provide essential information for job planning, contribute towards medical appraisal for revalidation, and facilitate productivity and quality improvement. To develop a framework for IPR for consultants, and to determine attitudes on its value, process and content. Information from commercial, public and voluntary sector models and published and other literature sources were used to develop an IPR framework. This was assessed through a three-cycle action research methodology involving qualitative interviews with 22 consultants (predominantly with medical management roles). The domains of the IPR framework included: (1) performance against objectives; (2) behaviour and leadership; (3) talent management; (4) agreed future objectives. A number of themes were identified from the consultant interviews including: ineffective current appraisal systems reflecting a lack of valid performance data and allotted time; a lack of empowerment of medical managers to address performance issues; IPR as a more explicit system, offering value in evaluating doctors performance; and the dependence of successful implementation on the engagement of the Trust executive. IPR may have value for performance evaluation of consultants, contributing toward job planning and complementing medical appraisal. Support by their employing organisation and engagement with medical managers in design and implementation is likely to be essential.

  7. A New Vision for Integrated Breast Care.

    DTIC Science & Technology

    1999-09-01

    management with recommendations for strategic information systems use and overall process improvements. " Wrote the business plan for a physician group... business and marketing plans for physician network expansion. Performed market research and internal operational and strategic analyses. Identified...Berkeley Master of Business Administration (MBA) May 1994 • Concentration: Marketing and Strategic Planning * Event Chairman, MBA Challenge for Charity

  8. Federal Student Aid (FSA) Five-Year Strategic Plan. FY 2004-2008

    ERIC Educational Resources Information Center

    US Department of Education, 2004

    2004-01-01

    The FSA Five-Year Strategic Plan is a roadmap for FY 2004-2008 that identifies five long-range strategic objectives, tactical short-term goals, and performance management initiatives. In working toward the goals outlined in the plan, FSA will address a number of key challenges, including legacy system migration, business process re-engineering,…

  9. Individual differences and day-to-day fluctuations in goal planning and type 1 diabetes management.

    PubMed

    Wiebe, Deborah J; Baker, Ashley C; Suchy, Yana; Stump, Tammy K; Berg, Cynthia A

    2018-04-26

    To examine whether individual differences and day-to-day fluctuations in diabetes goal planning are associated with Type 1 diabetes (T1D) management during late adolescence, and whether lapses in daily diabetes goal planning are more disruptive to diabetes management among those with poorer executive functioning (EF). Late adolescents with T1D (N = 236, Mage = 17.77 years) completed survey measures assessing individual differences in levels of diabetes goal planning and adherence, as well as survey and performance-based measures of EF; glycemic control was assessed through glycated hemoglobin (HbA1c) assays. Participants then completed a 2-week daily diary, rating items measuring daily diabetes goal planning, goal effort, and adherence, and recording blood-glucose tests from their glucometer at the end of each day. Analyses of survey measures indicated that higher individual differences in diabetes goal planning were associated with better adherence and glycemic control. Analyses of daily data using hierarchical linear modeling indicated that adolescents displayed higher daily adherence and lower blood-glucose levels on days when they had higher-than-their-average levels of daily goal planning and daily goal effort. EF moderated the association between daily goal planning and daily adherence, indicating that lapses in daily goal planning were more disruptive for adolescents with poorer EF. Both individual differences and day-to-day fluctuations in diabetes goal planning are associated with diabetes management, highlighting the challenges of managing T1D in daily life. Youth in late adolescence with poorer EF may especially benefit from planning to attain diabetes goals on a daily basis. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  10. Data Integration Framework Data Management Plan Remote Sensing Dataset

    DTIC Science & Technology

    2016-07-01

    performed by the Coastal Observations and Analysis Branch (CEERD-HFA) of the Flood and Storm Protection Division (CEERD-HF), U.S. Army Engineer Research... Protection Division, Coastal Observations and Analysis Branch CESAM U.S. Army Corps of Engineers, Mobile District CESAM-OP-J U.S. Army Corps of Engineers...ER D C/ CH L SR -1 6- 2 Coastal Ocean Data Systems Program Data Integration Framework Data Management Plan Remote Sensing Dataset Co

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Erhart, Steven C.; Spencer, Charles G.

    The accomplishments to date and the long-range planning of the Y-12 Energy Management and Sustainability and Stewardship programs support the U.S. Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) vision for a commitment to energy effi ciency and sustainability and to achievement of the Guiding Principles. Specifi cally, the Y-12 vision is to support the Environment, Safety and Health Policy and the DOE Strategic Sustainability Performance Plan (SSPP), while promoting overall sustainability and reduction of greenhouse gas (GHG) emissions. The mission of the Y-12 Energy Management program is to incorporate energy-efficient technologies site-wide and to position Y-12more » to meet NNSA energy requirement needs through 2025 and beyond. This plan addresses: Greenhouse Gas Reduction and Comprehensive Greenhouse Gas Inventory; Buildings, ESPC Initiative Schedule, and Regional and Local Planning; Fleet Management; Water Use Efficiency and Management; Pollution Prevention and Waste Reduction; Sustainable Acquisition; Electronic Stewardship and Data Centers; Renewable Energy; Climate Change; and Budget and Funding.« less

  12. Office Skills: Time Management Skills for Future Office Workers.

    ERIC Educational Resources Information Center

    Mott, Dennis L.

    1980-01-01

    Compares two time studies which investigated time problems of office assistants and managerial personnel. Suggests that improving performance in the following five areas will help time management: plan, "prioritize," set deadlines, follow through, and think. (LRA)

  13. North Carolina DOT peer exchange on performance management

    DOT National Transportation Integrated Search

    2014-09-01

    This report highlights key recommendations and best practices identified at the peer exchange on Transportation Asset Management Plans (TAMP), held on February 5 and 6, 2014, in Columbia, South Carolina. This event was sponsored by the Transportation...

  14. Recent developments in the French programme for radioactive waste management planning Act of 28 june 2006

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ouzounian, G.

    2007-07-01

    In 2005, new developments on radioactive-waste management in France were marked mostly by the preparation of the 2006 milestone specified in the act of 30 December 1991. A bill on radioactive waste management has been prepared by the Government at the beginning of 2006 and passed to the French Parliament on 15 June 2006. The Planning Act on the sustainable management of radioactive materials and wastes has been drawn from the results of the 15 years of research performed by ANDRA and the CEA on 'partitioning and transmutation of long-lived radionuclides', 'deep geological disposal' and 'conditioning and long term interimmore » storage'. Major milestones during those two last years are presented, including reviews of the Dossier 2005, official reports, the Public Debate, and finally the Planning Act. (authors)« less

  15. Successful healthcare programs and projects: organization portfolio management essentials.

    PubMed

    Pickens, Scott; Solak, Jamie

    2005-01-01

    Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes.

  16. Priority scheme planning for the robust SSM/PMAD testbed

    NASA Technical Reports Server (NTRS)

    Elges, Michael R.; Ashworth, Barry R.

    1991-01-01

    Whenever mixing priorities of manually controlled resources with those of autonomously controlled resources, the space station module power management and distribution (SSM/PMAD) environment requires cooperating expert system interaction between the planning function and the priority manager. The elements and interactions of the SSM/PMAD planning and priority management functions are presented. Their adherence to cooperating for common achievement are described. In the SSM/PMAD testbed these actions are guided by having a system planning function, KANT, which has insight to the executing system and its automated database. First, the user must be given access to all information which may have an effect on the desired outcome. Second, the fault manager element, FRAMES, must be informed as to the change so that correct diagnoses and operations take place if and when faults occur. Third, some element must engage as mediator for selection of resources and actions to be added or removed at the user's request. This is performed by the priority manager, LPLMS. Lastly, the scheduling mechanism, MAESTRO, must provide future schedules adhering to the user modified resource base.

  17. Monitoring of the Quality of the Defense Contract Audit Agency FY 2010 Audits

    DTIC Science & Technology

    2013-03-07

    performed by regional audit managers include reviewing high risk assignments and reports prior to their issuance, performing post-issuance reviews, or...brainstorming procedure requires the audit team ( managers , supervisors, and auditors) to discuss the risk of fraud for that engagement and to discuss the risk ...auditors to make inquiries of contractor management of management’s knowledge of fraud risks during its annual planning meeting with major contractors

  18. NASA Year 2000 (Y2K) Program Plan

    NASA Technical Reports Server (NTRS)

    1998-01-01

    NASA initiated the Year 2000 (Y2K) program in August 1996 to address the challenges imposed on Agency software, hardware, and firmware systems by the new millennium. The Agency program is centrally managed by the NASA Chief Information Officer, with decentralized execution of program requirements at each of the nine NASA Centers, Headquarters and the Jet Propulsion Laboratory. The purpose of this Program Plan is to establish Program objectives and performance goals; identify Program requirements; describe the management structure; and detail Program resources, schedules, and controls. Project plans are established for each NASA Center, Headquarters, and the Jet Propulsion Laboratory.

  19. Healthcare succession planning: an integrative review.

    PubMed

    Carriere, Brian K; Muise, Melanie; Cummings, Greta; Newburn-Cook, Chris

    2009-12-01

    Succession planning is a business strategy that has recently gained attention in the healthcare literature, primarily because of nursing shortage concerns and the demand for retaining knowledgeable personnel to meet organizational needs. Little research has been conducted in healthcare settings that clearly defines best practices for succession planning frameworks. To effectively carry out such organizational strategies during these challenging times, an integrative review of succession planning in healthcare was performed to identify consistencies in theoretical approaches and strategies for chief nursing officers and healthcare managers to initiate. Selected articles were compared with business succession planning to determine whether healthcare strategies were similar to best practices already established in business contexts. The results of this integrative review will aid leaders and managers to use succession planning as a tool in their recruitment, retention, mentoring, and administration activities and also provide insights for future development of healthcare succession planning frameworks.

  20. Implement balanced scorecard to translate strategic plan into actionable objectives.

    PubMed

    2004-09-01

    Faced with challenges ranging from declining reimbursement to staff shortages, health care organizations--integrated delivery systems, physician group practices, disease management providers, and others--increasingly are turning to general business models to map out step-by-step action plans for performance measurement and process improvement. Creating a "balanced scorecard" is an obvious starting point for assessing and improving clinical and financial performance.

  1. 75 FR 22706 - Defense Federal Acquisition Regulation Supplement; Service Contract Surveillance (DFARS Case 2008...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ...DoD is issuing a final rule amending the Defense Federal Acquisition Regulation Supplement (DFARS) to ensure that the requirement for a quality assurance surveillance plan is addressed for each contract with a dollar value above the simplified acquisition threshold, and that contracts for services have appropriate performance management or surveillance plans prepared for the work being performed under the contract.

  2. Integrating Fuel Treatments into Comprehensive Ecosystem Management

    Treesearch

    Kevin Hyde; Greg Jones; Robin Silverstein; Keith Stockmann; Dan Loeffler

    2006-01-01

    To plan fuel treatments in the context of comprehensive ecosystem management, forest managers must meet multiple-use and environmental objectives, address administrative and budget constraints, and reconcile performance measures from multiple policy directives. We demonstrate a multiple criteria approach to measuring success of fuel treatments used in the Butte North...

  3. Information technology and emergency management: preparedness and planning in US states.

    PubMed

    Reddick, Christopher

    2011-01-01

    The purpose of this paper is to examine the impact of information technology (IT) on emergency preparedness and planning by analysing a survey of US state government departments of emergency management. The research results show that there has been a significant impact of IT on emergency planning. IT has proven to be effective for all phases of emergency management, but especially for the response phase. There are numerous technologies used in emergency management, ranging from the internet, Geographic Information Systems and wireless technologies to more advanced hazard analysis models. All were generally viewed as being effective. Lack of financial resources and support from elected officials is a perennial problem in public administration, and was found to be prevalent in this study of IT and emergency management. There was evidence that state governments rating high on a performance index were more likely to use IT for emergency management. © 2011 The Author(s). Disasters © Overseas Development Institute, 2011.

  4. Aircrew-aircraft integration: A summary of US Army research programs and plans

    NASA Technical Reports Server (NTRS)

    Key, D. L.; Aiken, E. W.

    1984-01-01

    A review of selected programs which illustrate the research efforts of the U.S. Army Aeromechanics Laboratory in the area of aircrew-aircraft integration is presented. Plans for research programs to support the development of future military rotorcraft are also described. The crew of a combat helicopter must, in general, perform two major functions during the conduct of a particular mission: flightpath control and mission management. Accordingly, the research programs described are being conducted in the same two major categories: (1) flightpath control, which encompasses the areas of handling qualities, stability and control, and displays for the pilot's control of the rotorcraft's flightpath, and (2) mission management, which includes human factors and cockpit integration research topics related to performance of navigation, communication, and aircraft systems management tasks.

  5. Finance and supply management project execution plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BENNION, S.I.

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  6. Visit from JAXA to NASA MSFC: The Engines Element & Ideas for Collaboration

    NASA Technical Reports Server (NTRS)

    Greene, William D.

    2013-01-01

    System Design, Development, and Fabrication: Design, develop, and fabricate or procure MB-60 component hardware compliant with the imposed technical requirements and in sufficient quantities to fulfill the overall MB-60 development effort. System Development, Assembly, and Test: Manage the scope of the development, assembly, and test-related activities for MB-60 development. This scope includes engine-level development planning, engine assembly and disassembly, test planning, engine testing, inspection, anomaly resolution, and development of necessary ground support equipment and special test equipment. System Integration: Provide coordinated integration in the realms of engineering, safety, quality, and manufacturing disciplines across the scope of the MB-60 design and associated products development Safety and Mission Assurance, structural design, fracture control, materials and processes, thermal analysis. Systems Engineering and Analysis: Manage and perform Systems Engineering and Analysis to provide rigor and structure to the overall design and development effort for the MB-60. Milestone reviews, requirements management, system analysis, program management support Program Management: Manage, plan, and coordinate the activities across all portions of the MB-60 work scope by providing direction for program administration, business management, and supplier management.

  7. Concept of Science Data Management for the Korea Pathfinder Lunar Orbiter

    NASA Astrophysics Data System (ADS)

    Kim, Joo Hyeon

    2016-10-01

    South Korea has a plan to explore the Moon in 2018 or 2019. For the plan, the Korea Aerospace Research Institute which is a government funded research institute kicked off the Korea Lunar Exploration Development Program in January, 2016 in support of Ministry of Science, ICT and Future Planning, South Korea.As the 1st stage mission of the program, named as the Korea Pathfinder Lunar Orbiter(KPLO), will perform acquisition of high resolution images and science data for investigation of lunar environment as well as the core technology demonstration and validation for space explorations. The scientific instruments consists of three Korean domestic developed science instruments except an imaging instrument and several foreign provided instruments. We are developing a science data management plan to encourage scientific activities using science data acquired by the science instruments.I introduce the Korean domestic developed science instruments and present concept of the science data management plan for data delivery, processing, and distribution for the science instruments.

  8. Collaborating for care: initial experience of embedded case managers across five medical homes.

    PubMed

    Treadwell, Janet; Giardino, Angelo

    2014-01-01

    The purpose of this intervention was to answer the following question: Does an embedded nurse case manager from a health plan performing embedded care coordination and supporting a quality improvement project impact medical home service use, role satisfaction, and per member per month expense? The setting for this study was primary care medical home practices with a minimum of 1,000 lives, contracted with a health plan delivering Medicaid and Children's Health Insurance coverage. Five medical home practice sites were selected for the intervention. The study began with case manager training and project permission in 5 medical homes, followed by implementation of care coordination with health plan clients. The nurse case manager performed care coordination functions for clients and initiated a Lean Six Sigma quality improvement project at the medical home site. The analysis strategy was to compare each medical home with itself before and after the intervention, as well as to obtain satisfaction information from medical home staff and care coordinators. Reductions in expense, as demonstrated by decreased per member per month claim cost, admissions per thousand, and reduced variation in days per thousand, were documented. Quality projects attained significant improvements in 4 out of 5 sites, and practice staff as well as case managers described satisfaction with the embedded nurse case manager role. These findings support medical homes as being an effective delivery model of the Affordable Care Act. Case managers who practice in primary care sites can make a significant difference in patient outcomes and practice efficiencies. Embedded case managers have the ability to impact the population being served through modeling and supporting interprofessional relationships and case management expertise. Use of motivational interviewing, assessment skills, advocacy, and joint care planning engage patients in their own care, whereas quality initiatives bring efficiencies and effectiveness to overall operations. There is need for research to be conducted across a larger number of practice sites and diverse populations to substantiate the effect of embedded case management in medical home.

  9. Speaking across the drapes: communication strategies of anesthesiologists and obstetricians during a simulated maternal crisis.

    PubMed

    Minehart, Rebecca D; Pian-Smith, May C M; Walzer, Toni B; Gardner, Roxane; Rudolph, Jenny W; Simon, Robert; Raemer, Daniel B

    2012-06-01

    Organizational behavior and management fields have long realized the importance of teamwork and team-building skills, but only recently has health care training focused on these critical elements. Communication styles and strategies are a common focus of team training but have not yet been consistently applied to medicine. We sought to determine whether such communication strategies, specifically "advocacy" and "inquiry," were used de novo by medical professionals in a simulation-based teamwork and crisis resource management course. Explicit expression of a jointly managed clinical plan between providers, a strategy shown to improve patient safety, was also evaluated. Forty-four of 54 videotaped performances of an ongoing team-building skills course were viewed and analyzed for presence of advocacy and/or inquiry that related to information or a plan; inclusion criteria were participation of a nonconfederate obstetrician and an anesthesiologist. Verbal statement of a jointly managed clinical plan was also recorded. Anesthesiologists advocated information in 100% of cases and advocated their plans in 93% of cases but inquired information in 30% of cases and inquired about the obstetricians' plans in 11% of cases. Obstetricians advocated information in 73% of cases, advocated their plans in 73% of cases, inquired information in 75% of cases, and inquired about the anesthesiologists' plans in 59% of cases. An explicitly stated joint team plan was formed in 45% of cases. Anesthesiologists advocated more frequently than obstetricians, while obstetricians inquired and advocated in more balanced proportions. However, fewer than half of the teams explicitly agreed on a joint plan. Increasing awareness of communication styles, and possibly incorporating these skills into medical training, may help teams arrive more efficiently at jointly managed clinical plans in crisis situations.

  10. Environmental Management System Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fox, Robert; Thorson, Patrick; Horst, Blair

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and othermore » natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These DOE Orders and associated policies establish goals and sustainable stewardship practices that are protective of environmental, natural, and cultural resources, and take a life cycle approach that considers aspects such as: (1) Acquisition and use of environmentally preferable products; (2) Electronics stewardship; (3) Energy conservation, energy efficiency, and renewable energy; (4) Pollution prevention, with emphasis on toxic and hazardous chemical and material reduction; (5) Procurement of efficient energy and water consuming materials and equipment; (6) Recycling and reuse; (7) Sustainable and high-performance building design; (8) Transportation and fleet management; and (9) Water conservation. LBNL's approach to sustainable environmental stewardship required under Order 450.1A poses the challenge of implementing its EMS in a compliance-based, performance-based, and cost-effective manner. In other words, the EMS must deliver real and tangible business value at a minimal cost. The purpose of this plan is to describe Berkeley Lab's approach for achieving such an EMS, including an overview of the roles and responsibilities of key Laboratory parties. This approach begins with a broad-based environmental policy consistent with that stated in Chapter 11 of the LBNL Health and Safety Manual (PUB-3000). This policy states that Berkeley Lab is committed to the following: (1) Complying with applicable environmental, public health, and resource conservation laws and regulations. (2) Preventing pollution, minimizing waste, and conserving natural resources. (3) Correcting environmental hazards and cleaning up existing environmental problems, and (4) Continually improving the Laboratory's environmental performance while maintaining operational capability and sustaining the overall mission of the Laboratory. A continual cycle of planning, implementing, evaluating, and improving processes will be performed to achieve goals, objectives, and targets that will help LBNL carry out this policy. Each year, environmental aspects will be identified and their impacts to the environment will be evaluated. Objectives and targets will be developed (or updated) for each aspect that is determined to have a significant impact. Environmental Management Programs (EMPs) will be prepared (or updated) to document actions necessary for reducing certain environmental impacts. Each EMP will identify responsible parties and associated target deadlines for each action. Quarterly, environmental programs will be reviewed for compliance issues and effectiveness. Annually, an internal assessment will be performed to evaluate the progress of the EMS, and LBNL senior management will review the results. In addition, at least once every 3 years a third-party audit will be performed to validate that the EMS is being implemented according to plan.« less

  11. Examining the Challenging Hindrances facing in the Construction Projects: South India’s Perspective

    NASA Astrophysics Data System (ADS)

    Subramanyam, K.; Haridharan, M. K.

    2017-07-01

    Developing countries like India require a huge infrastructure to facilitate needs of the people. Construction industry provides several opportunities to the individuals. Construction manager work is to supervise and organize the construction activities in construction projects. Now a day construction manager facing challenges. This paper aimed to study the challenges facing by the construction manager in the perception of construction professionals. 39 variables were taken from the literature review which found to be severe impact on construction managers’ performance. Construction manager, project manager and site engineers are the respondents for this survey. Using SPSS, regression analysis was done and recognized significant challenges. These challenges were classified into 5 domains. In management challenges, resource availability and allocation, risks and uncertainties existing in the project onsite, top management support and cost constraints are the most significant variables. In skills requirement of a construction manager challenges, technical skills required to learn and adapt new technology in the project, decision making and planning according to the situation in site are the most significant variables. In performance challenges, implementation of tasks according to the plan is the important variable whereas in onsite challenges, manage project risks, develop project policies and procedures are the most important.

  12. Strategic issues in performance appraisal: theory and practice.

    PubMed

    Fombrun, C J; Laud, R L

    1983-01-01

    Performance appraisal systems have tremendous strategic potential for governing employee behavior and thus corporate direction through their links to selection, training and career planning, and reward systems. Authors Charles J. Fombrun, assistant professor of management at the University of Pennsylvania's Wharton School, and Robert P. Laud, senior vice-president of Drake Beam Morin, Inc., surveyed appraisal systems of Fortune 1300 corporations to find out how well companies are realizing this potential. Among their conclusions: (1) In most organizations, the typical performance appraisal system is focused on short-term goals. Strengthening the linkage between the appraisal system and the long-term implications of strategic planning could improve organizational effectiveness in the future. (2) The performance appraisal system's most prevalent use is as a feedback mechanism rather than as a management tool. Thus, the authors conclude, the role of the performance appraisal system as a strategic organizational tool is largely unappreciated by U.S. organizations.

  13. Y-12 Site Sustainability Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Spencer, Charles G

    2012-12-01

    The accomplishments to date and the long-range planning of the Y-12 Energy Management and Sustainability and Stewardship programs support the U.S. Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) vision for a commitment to energy effi ciency and sustainability and to achievement of the Guiding Principles. Specifi cally, the Y-12 vision is to support the Environment, Safety and Health Policy and the DOE Strategic Sustainability Performance Plan, while promoting overall sustainability and reduction of greenhouse gas emissions. The mission of the Y-12 Energy Management program is to incorporate energy-effi cient technologies site-wide and to position Y-12 tomore » meet NNSA energy requirement needs through 2025 and beyond. The plan addresses greenhouse gases, buildings, fleet management, water use, pollution prevention, waste reduction, sustainable acquisition, electronic stewardship and data centers, site innovation and government-wide support.« less

  14. 40 CFR 60.2630 - What should I include in my waste management plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emissions Guidelines and Compliance Times for Commercial and Industrial Solid Waste Incineration Units Model Rule-Waste Management.... Model Rule—Operator Training and Qualification ...

  15. 40 CFR 60.2630 - What should I include in my waste management plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emissions Guidelines and Compliance Times for Commercial and Industrial Solid Waste Incineration Units Model Rule-Waste Management.... Model Rule—Operator Training and Qualification ...

  16. Pavement management system for City of Madison : research brief.

    DOT National Transportation Integrated Search

    2016-11-01

    In this study, a complete pavement management system (PMS) was created and implemented in : Madison, SD. The system consists of a street geodatabase, development of pavement performance : models and maintenance & rehabilitation (M&R) plans. The PMS d...

  17. Applicability Evaluation of Job Standards for Diabetes Nutritional Management by Clinical Dietitian

    PubMed Central

    2017-01-01

    This study was conducted to evaluate applicability of job standards for diabetes nutrition management by hospital clinical dietitians. In order to promote the clinical nutrition services, it is necessary to present job standards of clinical dietitian and to actively apply these standardized tasks to the medical institution sites. The job standard of clinical dietitians for diabetic nutrition management was distributed to hospitals over 300 beds. Questionnaire was collected from 96 clinical dietitians of 40 tertiary hospitals, 47 general hospitals, and 9 hospitals. Based on each 5-point scale, the importance of overall duty was 4.4 ± 0.5, performance was 3.6 ± 0.8, and difficulty was 3.1 ± 0.7. ‘Nutrition intervention’ was 4.5 ± 0.5 for task importance, ‘nutrition assessment’ was 4.0 ± 0.7 for performance, and ‘nutrition diagnosis’ was 3.4 ± 0.9 for difficulty. These 3 items were high in each category. Based on the grid diagram, the tasks of both high importance and high performance were ‘checking basic information,’ ‘checking medical history and therapy plan,’ ‘decision of nutritional needs,’ ‘supply of foods and nutrients,’ and ‘education of nutrition and self-management.’ The tasks with high importance but low performance were ‘derivation of nutrition diagnosis,’ ‘planning of nutrition intervention,’ ‘monitoring of nutrition intervention process.’ The tasks of both high importance and high difficulty were ‘derivation of nutrition diagnosis,’ ‘planning of nutrition intervention,’ ‘supply of foods and nutrients,’ ‘education of nutrition and self-management,’ and ‘monitoring of nutrition intervention process.’ The tasks of both high performance and high difficulty were ‘documentation of nutrition assessment,’ ‘supply of foods and nutrients,’ and ‘education of nutrition and self-management.’ PMID:28503506

  18. Planning Information Flow for the Small College.

    ERIC Educational Resources Information Center

    Zastrocky, Michael

    1986-01-01

    Information management has taken on more meaning for the small to medium-sized college and university in recent years. Advances in hardware and software have brought improved performances to campuses at a lower cost. Some of the planning methods used by Regis College are outlined. (MLW)

  19. A synthesis of the "state-of-the-practice for advancing planning and operations integration opportunities within transportation agencies" : [summary].

    DOT National Transportation Integrated Search

    2014-12-01

    Federal law requires that metropolitan transportation plans include operations and : management strategies to improve the performance of existing roads, relieve congestion, : and maximize the safety and mobility of people and cargo. Transportation op...

  20. How to Submit a Risk Management Plan (RMP) to EPA

    EPA Pesticide Factsheets

    RMP*eSubmit software is the only way to submit RMPs. After you have prepared your plan using RMP*eSubmit, you may also re-submit, correct, or withdraw an RMP. Another electronic tool, RMP*Comp, performs the required off-site consequence analysis.

  1. Report: Performance Track Could Improve Program Design and Management to Ensure Value

    EPA Pesticide Factsheets

    Report #2007-P-00013, March 29, 2007. We found that Performance Track did not have clear plans that connected activities with its goals, and did not have performance measures that show if it achieves anticipated results.

  2. Diverter AI based decision aid, phases 1 and 2

    NASA Technical Reports Server (NTRS)

    Sexton, George A.; Bayles, Scott J.; Patterson, Robert W.; Schulke, Duane A.; Williams, Deborah C.

    1989-01-01

    It was determined that a system to incorporate artificial intelligence (AI) into airborne flight management computers is feasible. The AI functions that would be most useful to the pilot are to perform situational assessment, evaluate outside influences on the contemplated rerouting, perform flight planning/replanning, and perform maneuver planning. A study of the software architecture and software tools capable of demonstrating Diverter was also made. A skeletal planner known as the Knowledge Acquisition Development Tool (KADET), which is a combination script-based and rule-based system, was used to implement the system. A prototype system was developed which demonstrates advanced in-flight planning/replanning capabilities.

  3. Jefferson Proving Ground, South of the Fining Line, Final Remedial Investigation/Feasibility Study, Resource Management Plan

    DTIC Science & Technology

    1993-01-01

    and various DOD sites. I From 1984 to 1987, Mr. Pincock was a Certified Radiation and Chemistry Technician for United Nuclear Industries. He performed...in 1983, Mr. Pincock assisted the senior technical staff in radiation protection as a Junior Health Physics Technician at the Nuclear Support Services...SCOPE OF PROGRAM This plan contains a description of the personnel and procedures for managing the Remedial Investigation/Feasibility Study (RI/FS) at

  4. User testing and performance evaluation of the Electronic Quality Improvement Platform for Plans and Pharmacies.

    PubMed

    Pringle, Janice L; Kearney, Shannon M; Grasso, Kim; Boyer, Annette D; Conklin, Mark H; Szymanski, Keith A

    2015-01-01

    To user-test and evaluate a performance information management platform that makes standardized, benchmarked medication use quality data available to both health plans and community pharmacy organizations. Multiple health/drug plans and multiple chain and independent pharmacies across the United States. During the first phase of the study, user experience was measured via user satisfaction surveys and interviews with key personnel (pharmacists, pharmacy leaders, and health plan leadership). Improvements were subsequently made to the platform based on these findings. During the second phase of the study, the platform was implemented in a greater number of pharmacies and by a greater number of payers. User experience was then reevaluated to gather information for further improvements. The surveys and interviews revealed that users found the Web-based platform easy to use and beneficial in terms of understanding and comparing performance metrics. Primary concerns included lack of access to real-time data and patient-specific data. Many users also expressed uncertainty as to how they could use the information and data provided by the platform. The study findings indicate that while information management platforms can be used effectively in both pharmacy and health plan settings, future development is needed to ensure that the provided data can be transferred to pharmacy best practices and improved quality care.

  5. Integrated payload and mission planning, phase 3. Volume 1: Integrated payload and mission planning process evaluation

    NASA Technical Reports Server (NTRS)

    Sapp, T. P.; Davin, D. E.

    1977-01-01

    The integrated payload and mission planning process for STS payloads was defined, and discrete tasks which evaluate performance and support initial implementation of this process were conducted. The scope of activity was limited to NASA and NASA-related payload missions only. The integrated payload and mission planning process was defined in detail, including all related interfaces and scheduling requirements. Related to the payload mission planning process, a methodology for assessing early Spacelab mission manager assignment schedules was defined.

  6. The Hybrid Management Model: Influences of Organizational Structure and IT Project Management Practices on the Performance of Federal IT Projects

    ERIC Educational Resources Information Center

    Neves, Celine A.

    2012-01-01

    The federal government spends much money on information technology (IT) projects each year, yet numerous IT projects continue to underperform. For instance, in Fiscal Year 2008, OMB and federal agencies identified approximately 413 IT projects ($25.2 billion) as being poorly planned, poorly performing, or both. Agencies struggle to implement sound…

  7. Public Management Reform and Organizational Performance: An Empirical Assessment of the U.K. Labour Government's Public Service Improvement Strategy

    ERIC Educational Resources Information Center

    Walker, Richard M.; Boyne, George A.

    2006-01-01

    We present the first empirical assessment of the U.K. Labour government's program of public management reform. This reform program is based on rational planning, devolution and delegation, flexibility and incentives, and enhanced choice. Measures of these variables are tested against external and internal indicators of organizational performance.…

  8. Impact of the lung oncology multidisciplinary team meetings on the management of patients with cancer.

    PubMed

    Ung, Kim Ann; Campbell, Belinda A; Duplan, Danny; Ball, David; David, Steven

    2016-06-01

    Multidisciplinary team (MDT) meetings are increasingly regarded as a component of multidisciplinary cancer care. We aimed to prospectively measure the impact of MDT meetings on clinicians' management plans for lung oncology patients, and the implementation rate of the meeting recommendations. Consecutive patient cases presented at the weekly lung oncology MDT meetings were prospectively enrolled. Investigators compared the clinicians' management plans pre-meeting with the consensus plans post-meeting. The meeting was considered to have an impact on management plans if ≥1 of the following changes were detected: tumor stage, histology, treatment intent or treatment modality, or if additional investigations were recommended. Investigators reviewed hospital patient records at 4 months to determine if the meeting recommendations were implemented. Reasons for non-implementation were also recorded. Of the 55 eligible cases, the MDT meeting changed management plans in 58% (CI 45-71%; P < 0.005). These changes included: additional investigations (59%), or changes in treatment modality (19%), treatment intent (9%), histology (6%) or tumor stage (6%). The meeting recommendations were implemented in 72% of cases. Reasons for non-implementation included deteriorating patient performance status, clinician's preference, the influence of new clinical information obtained after the meeting or patient decision. MDT meetings significantly impact on the management plans for lung oncology patients. The majority of MDT recommendations (72%) were implemented into patient care. These findings provide further evidence to support the role of MDT meetings as an essential part of the decision-making process for the optimal multidisciplinary management of patients with cancer. © 2014 Wiley Publishing Asia Pty Ltd.

  9. DELPHI AND VALUES,

    DTIC Science & Technology

    MANAGEMENT PLANNING AND CONTROL, DECISION MAKING), (* DECISION MAKING , GROUP DYNAMICS), (*GROUP DYNAMICS, ATTITUDES(PSYCHOLOGY)), REASONING, REACTION(PSYCHOLOGY), PUBLIC OPINION, PERFORMANCE(HUMAN), QUESTIONNAIRES, FEEDBACK

  10. Performance-Based Service Acquisition (PBSA) Study and Graduate Level Course Material

    DTIC Science & Technology

    2005-12-01

    Realizing Marketplace Potential, Acquisition Solutions, Inc (Advisory), February 2001 Dickson, Bob, March 10, 2003. Federal 7 Contract Law : Feds...Management and Policy Federal Contract Law : Feds should use market research to refine IT plans Session 4: The Performance Requirements and...March 10, 2003. Federal Contract Law : Feds should use market research to refine IT plans, Post-Newsweek Media, Inchttp://appserv.gcn.com/cgi- bin/udt

  11. Quality of psychiatric care in the general hospital: referrer perceptions of an inpatient liaison psychiatry service.

    PubMed

    Solomons, Luke C; Thachil, Ajoy; Burgess, Caroline; Hopper, Adrian; Glen-Day, Vicky; Ranjith, Gopinath; Hodgkiss, Andrew

    2011-01-01

    To explore the experience of senior staff on acute medical wards using an established inpatient liaison psychiatry service and obtain their views on clinically relevant performance measures. Semistructured face-to-face interviews with consultants and senior nurses were taped, transcribed and analyzed manually using the framework method of analysis. Twenty-five referrers were interviewed. Four key themes were identified - benefits of the liaison service, potential areas of improvement, indices of service performance such as speed and quality of response and expanded substance misuse service. Respondents felt the liaison service benefited patients, staff and service delivery in the general hospital. Medical consultants wanted stepped management plans devised by consultant liaison psychiatrists. Senior nurses, who perceived themselves as frontline crisis managers, valued on-the-spot input on patient management. Consultants and senior nurses differed in their expectations of liaison psychiatry. Referrers valued speed of response and regarded time from referral to definitive management plan as a key performance indicator for benchmarking services. Copyright © 2011 Elsevier Inc. All rights reserved.

  12. A Rapid Decision Sampling Plan for Implementing Area—Wide Management of the Red Palm Weevil, Rhynchophorus ferrugineus, in Coconut Plantations of India

    PubMed Central

    Faleiro, J. R.; Ashok Kumar, J.

    2008-01-01

    The red palm weevil Rhynchophorus ferrugineus Olivier (Curculionidae/Rhynchophoridae/Dryophthoridae) is a lethal pest of young coconut palms, Cocos nucifera L. (Arecales: Arecaceae), with a highly aggregated population distribution pattern. R. ferrugineus is managed in several coconut growing countries using area-wide pheromone based programmes that need a substantial commitment of funds over a period of time. Often, decisions to implement area-wide management of R. ferrugineus are based on pheromone trap captures in surveillance traps and or infestation reports. Implementing area-wide management of this pest on the basis of such data can be inaccurate, as it may either under or over estimate the pest intensity in the field. This study presents sampling plans for rapid and accurate classification of R. ferrugineus infestation in coconut plantations of India by inspecting palms to detect infestation in a sequence until a decision to either implement or not to initiate area-wide management of R. ferrugineus can be made. The sampling plans are based on a common aggregation index of 3.45, assumed action threshold values of either 1.0 (plan A) or 0.5 (plan B) per cent infested palms and a risk factor of making the wrong decision set at 0.05. Using plans A and B, if the cummulative number of infested palms in a young 1 hectare coconut plantation is zero out of 150 palms for both plans, then area-wide management is not required, while on the other hand, if the cummulative number of infested palms for the same area is 6 (plan A), or 5 (plan B), then area-wide management of R. ferrugineus is essential. The proposed sampling plans are efficient tools in decision making, particularly at very low and high levels of infestation and can also be used to assess the performance of R. ferrugineus IPM programmes that are in progress. These plans not only save time and money as only a small area needs to be sampled to arrive at a correct decision, but are also efficient in rating the infestation level accurately. PMID:20337561

  13. A rapid decision sampling plan for implementing area-wide management of the red palm weevil, Rhynchophorus ferrugineus, in coconut plantations of India.

    PubMed

    Faleiro, J R; Ashok Kumar, J

    2008-01-01

    The red palm weevil Rhynchophorus ferrugineus Olivier (Curculionidae/Rhynchophoridae/Dryophthoridae) is a lethal pest of young coconut palms, Cocos nucifera L. (Arecales: Arecaceae), with a highly aggregated population distribution pattern. R. ferrugineus is managed in several coconut growing countries using area-wide pheromone based programmes that need a substantial commitment of funds over a period of time. Often, decisions to implement area-wide management of R. ferrugineus are based on pheromone trap captures in surveillance traps and or infestation reports. Implementing area-wide management of this pest on the basis of such data can be inaccurate, as it may either under or over estimate the pest intensity in the field. This study presents sampling plans for rapid and accurate classification of R. ferrugineus infestation in coconut plantations of India by inspecting palms to detect infestation in a sequence until a decision to either implement or not to initiate area-wide management of R. ferrugineus can be made. The sampling plans are based on a common aggregation index of 3.45, assumed action threshold values of either 1.0 (plan A) or 0.5 (plan B) per cent infested palms and a risk factor of making the wrong decision set at 0.05. Using plans A and B, if the cumulative number of infested palms in a young 1 hectare coconut plantation is zero out of 150 palms for both plans, then area-wide management is not required, while on the other hand, if the cumulative number of infested palms for the same area is 6 (plan A), or 5 (plan B), then area-wide management of R. ferrugineus is essential. The proposed sampling plans are efficient tools in decision making, particularly at very low and high levels of infestation and can also be used to assess the performance of R. ferrugineus IPM programmes that are in progress. These plans not only save time and money as only a small area needs to be sampled to arrive at a correct decision, but are also efficient in rating the infestation level accurately.

  14. Improving supervision: a team approach.

    PubMed

    1993-01-01

    This issue of "The Family Planning Manager" outlines an interactive team supervision strategy as a means of improving family planning service quality and enabling staff to perform to their maximum potential. Such an approach to supervision requires a shift from a monitoring to a facilitative role. Because supervisory visits to the field are infrequent, the regional supervisor, clinic manager, and staff should form a team to share ongoing supervisory responsibilities. The team approach removes individual blame and builds consensus. An effective team is characterized by shared leadership roles, concrete work problems, mutual accountability, an emphasis on achieving team objectives, and problem resolution within the group. The team supervision process includes the following steps: prepare a visit plan and schedule; meet with the clinic manager and staff to explain how the visit will be conducted; supervise key activity areas (clinical, management, and personnel); conduct a problem-solving team meeting; conduct a debriefing meeting with the clinic manager; and prepare a report on the visit, including recommendations and follow-up plans. In Guatemala's Family Planning Unit, teams identify problem areas on the basis of agreement that a problem exists, belief that the problem can be solved with available resources, and individual willingness to accept responsibility for the specific actions identified to correct the problem.

  15. Management by Objectives: A Program of Measured Performance.

    ERIC Educational Resources Information Center

    Block, Philip

    1980-01-01

    Management by objectives (MBO) is defined and an MBO program adapted for clinic services of a college of podiatric medicine is presented. Major steps with specific examples for goal setting, action planning, self-control, and periodic review are outlined. (Author/MLW)

  16. 48 CFR 34.202 - Integrated Baseline Reviews.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Integrated Baseline... SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 34.202... inherent risks in offerors'/contractors' performance plans and the underlying management control systems...

  17. 48 CFR 34.202 - Integrated Baseline Reviews.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Integrated Baseline... SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 34.202... inherent risks in offerors'/contractors' performance plans and the underlying management control systems...

  18. 48 CFR 34.202 - Integrated Baseline Reviews.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Integrated Baseline... SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 34.202... inherent risks in offerors'/contractors' performance plans and the underlying management control systems...

  19. 48 CFR 34.202 - Integrated Baseline Reviews.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... inherent risks in offerors'/contractors' performance plans and the underlying management control systems...) The degree to which the management process provides effective and integrated technical/schedule/cost... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Integrated Baseline...

  20. The ground vehicle manager's associate

    NASA Technical Reports Server (NTRS)

    Edwards, Gary R.; Burnard, Robert H.; Bewley, William L.; Bullock, Bruce L.

    1994-01-01

    An overview of MAX, a software framework for manager's associate systems, is presented. MAX is used to develop and execute a problem-solving strategy for the task planning of semi-autonomous agents with the assistance of human performance. This paper describes the use of MAX in the supervisory management of robotic vehicles as they explore a planetary surface.

  1. Major Management Challenges and Program Risks. Department of Education

    DTIC Science & Technology

    2001-01-01

    GAO United States General Accounting Office Performance and Accountability SeriesJanuary 2001 Major Management Challenges and Program Risks ...34) Title and Subtitle Major Management Challenges and Program Risks Department of Education Contract or Grant Number Program Element Number Authors...Accountability Series: Major Management Challenges and Program Risks . In that series, GAO advised the Congress that it planned to reassess the

  2. Designing and evaluating a balanced scorecard for a health information management department in a Canadian urban non-teaching hospital.

    PubMed

    Nippak, Pria Md; Veracion, Julius Isidro; Muia, Maria; Ikeda-Douglas, Candace J; Isaac, Winston W

    2016-06-01

    This report is a description of a balanced scorecard design and evaluation process conducted for the health information management department at an urban non-teaching hospital in Canada. The creation of the health information management balanced scorecard involved planning, development, implementation, and evaluation of the indicators within the balanced scorecard by the health information management department and required 6 months to complete. Following the evaluation, the majority of members of the health information management department agreed that the balanced scorecard is a useful tool in reporting key performance indicators. These findings support the success of the balanced scorecard development within this setting and will help the department to better align with the hospital's corporate strategy that is linked to the provision of efficient management through the evaluation of key performance indicators. Thus, it appears that the planning and selection process used to determine the key indicators within the study can aid in the development of a balanced scorecard for a health information management department. In addition, it is important to include the health information management department staff in all stages of the balanced scorecard development, implementation, and evaluation phases. © The Author(s) 2014.

  3. 29 CFR 1956.81 - Developmental schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... contested cases and employee access to information equivalent to 29 CFR parts 1903, 1905, 1911 and 2200... will be developed and submitted with the FY 2010 Grant Application. The performance plan will focus on.... (k) Illinois and OSHA will develop a plan for joining the OSHA Integrated Management Information...

  4. Mississippi Curriculum Framework for Family Dynamics. Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for family dynamics. The course uses skills in critical thinking, decision…

  5. 76 FR 2700 - National Protection and Programs Directorate; National Emergency Communications Plan (NECP) Goal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-14

    ... Programs Directorate (NPPD)/Office of Cybersecurity and Communications (CS&C)/Office of Emergency Communications (OEC) will submit the following Information Collection Request to the Office of Management and... Directorate; National Emergency Communications Plan (NECP) Goal 2 Performance Report AGENCY: National...

  6. FY 95 engineering work plan for the design reconstitution implementation action plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bigbee, J.D.

    Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities,more » a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.« less

  7. Planning and Resource Management in an Intelligent Automated Power Management System

    NASA Technical Reports Server (NTRS)

    Morris, Robert A.

    1991-01-01

    Power system management is a process of guiding a power system towards the objective of continuous supply of electrical power to a set of loads. Spacecraft power system management requires planning and scheduling, since electrical power is a scarce resource in space. The automation of power system management for future spacecraft has been recognized as an important R&D goal. Several automation technologies have emerged including the use of expert systems for automating human problem solving capabilities such as rule based expert system for fault diagnosis and load scheduling. It is questionable whether current generation expert system technology is applicable for power system management in space. The objective of the ADEPTS (ADvanced Electrical Power management Techniques for Space systems) is to study new techniques for power management automation. These techniques involve integrating current expert system technology with that of parallel and distributed computing, as well as a distributed, object-oriented approach to software design. The focus of the current study is the integration of new procedures for automatically planning and scheduling loads with procedures for performing fault diagnosis and control. The objective is the concurrent execution of both sets of tasks on separate transputer processors, thus adding parallelism to the overall management process.

  8. Abnormal placental invasion--a novel approach to treatment case report and review.

    PubMed

    Ophir, Ella; Singer-Jordan, Jonathan; Odeh, Marwan; Hirch, Yael; Maksimovsky, Olga; Shaider, Oleg; Yvry, Simon; Solt, Ido; Bornstein, Jacob

    2009-12-01

    The incidence of abnormal placental invasion has increased 10-fold in the past 50 years, reflecting the increased number of cesarean sections performed. Management relies on accurate early diagnosis with appropriate perioperative multidisciplinary planning to anticipate and avoid massive obstetric hemorrhage at delivery. Women at risk should plan to deliver at an institution with appropriate expertise and resources for managing this condition. We report a case of placenta increta management comprising preoperative placement of a pelvic artery balloon catheter, prophylactic balloon occlusion after delivery of the fetus, and embolization-assisted resection of the invaded uterine wall. We review incidence, methods of prenatal diagnosis, risk factors, and management of abnormally invasive placenta.

  9. Developing a pain management program through continuous improvement strategies.

    PubMed

    Woodward, Dora

    2005-01-01

    Pain affects more than one third of cancer patients in the early stages of their disease, dramatically rising above 70% in the advanced stages. Numerous studies have been conducted in the pursuit of cancer pain relief, yet the prevalence of pain persists. This article focuses on a pain management program, developed by a performance improvement team, which addressed the inadequacies of current pain management. Performance improvement activities are described through the process of assessment, planning, implementation, and evaluation of the pain management program. This pain management program is uniquely derived from a unit core value that all staff is responsible and accountable for pain management.

  10. Materials Organization, Planning, and Homework Completion in Middle School Students with ADHD: Impact on Academic Performance.

    PubMed

    Langberg, Joshua M; Epstein, Jeffery N; Girio, Erin L; Becker, Stephen P; Vaughn, Aaron J; Altaye, Mekibib

    2011-06-01

    This study evaluated the homework functioning of middle school students with ADHD to determine what aspects are most predictive of school grades and the best source (e.g., parents or teachers) for obtaining this information. Students with ADHD in grades 5-8 ( N = 57) and their parents and teachers completed the Children's Organization Skills Scales (COSS) to measure materials organization, planning, and time-management, and parents completed the Homework Problems Checklist (HPC) to examine homework completion and homework materials management behaviors. Regression analyses revealed that parent-rated homework materials management and teacher-rated memory and materials management were the best predictors of school grades. These findings suggest that organization of materials is a critical component of the homework completion process for students with ADHD and an important target for intervention. Teachers were the best source of information regarding materials organization and planning, whereas parents were a valuable source of information for specific homework materials management problems.

  11. Materials Organization, Planning, and Homework Completion in Middle School Students with ADHD: Impact on Academic Performance

    PubMed Central

    Langberg, Joshua M.; Epstein, Jeffery N.; Girio, Erin L.; Becker, Stephen P.; Vaughn, Aaron J.; Altaye, Mekibib

    2013-01-01

    This study evaluated the homework functioning of middle school students with ADHD to determine what aspects are most predictive of school grades and the best source (e.g., parents or teachers) for obtaining this information. Students with ADHD in grades 5–8 (N = 57) and their parents and teachers completed the Children’s Organization Skills Scales (COSS) to measure materials organization, planning, and time-management, and parents completed the Homework Problems Checklist (HPC) to examine homework completion and homework materials management behaviors. Regression analyses revealed that parent-rated homework materials management and teacher-rated memory and materials management were the best predictors of school grades. These findings suggest that organization of materials is a critical component of the homework completion process for students with ADHD and an important target for intervention. Teachers were the best source of information regarding materials organization and planning, whereas parents were a valuable source of information for specific homework materials management problems. PMID:23577045

  12. 36 CFR 9.13 - Performance bond.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Performance bond. 9.13... MINERALS MANAGEMENT Mining and Mining Claims § 9.13 Performance bond. (a) Upon approval of a plan of operations the operator shall be required to file a suitable performance bond with satisfactory surety...

  13. 36 CFR 9.48 - Performance bond.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Performance bond. 9.48... MINERALS MANAGEMENT Non-Federal Oil and Gas Rights § 9.48 Performance bond. (a) Prior to approval of a plan of operations, the operator shall be required to file a suitable performance bond with satisfactory...

  14. 36 CFR 9.13 - Performance bond.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Performance bond. 9.13... MINERALS MANAGEMENT Mining and Mining Claims § 9.13 Performance bond. (a) Upon approval of a plan of operations the operator shall be required to file a suitable performance bond with satisfactory surety...

  15. 36 CFR 9.48 - Performance bond.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Performance bond. 9.48... MINERALS MANAGEMENT Non-Federal Oil and Gas Rights § 9.48 Performance bond. (a) Prior to approval of a plan of operations, the operator shall be required to file a suitable performance bond with satisfactory...

  16. 36 CFR 9.13 - Performance bond.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Performance bond. 9.13... MINERALS MANAGEMENT Mining and Mining Claims § 9.13 Performance bond. (a) Upon approval of a plan of operations the operator shall be required to file a suitable performance bond with satisfactory surety...

  17. Configuration management plan. System definition and project development. Repository Based Software Engineering (RBSE) program

    NASA Technical Reports Server (NTRS)

    Mckay, Charles

    1991-01-01

    This is the configuration management Plan for the AdaNet Repository Based Software Engineering (RBSE) contract. This document establishes the requirements and activities needed to ensure that the products developed for the AdaNet RBSE contract are accurately identified, that proposed changes to the product are systematically evaluated and controlled, that the status of all change activity is known at all times, and that the product achieves its functional performance requirements and is accurately documented.

  18. Strategic Planning and Management in Defense Systems Acquisition

    DTIC Science & Technology

    2013-10-01

    to Dr. John Bryson (2010), offers many benefits to public-sector organizations: • Promotes strategic thinking, acting, and learning; • Improves...and with strategic planning in particular—and has proven its value (Barzelay & Campbell, 2003; Berman & West, 1998; Berry & Wechsler, 1995; Boyne ...national survey. Public Administration Review, 55(2), 159–68. Boyne , G. A., & Gould-Williams, J. (2003). Planning and performance in public organizations

  19. Amplifying human ability through autonomics and machine learning in IMPACT

    NASA Astrophysics Data System (ADS)

    Dzieciuch, Iryna; Reeder, John; Gutzwiller, Robert; Gustafson, Eric; Coronado, Braulio; Martinez, Luis; Croft, Bryan; Lange, Douglas S.

    2017-05-01

    Amplifying human ability for controlling complex environments featuring autonomous units can be aided by learned models of human and system performance. In developing a command and control system that allows a small number of people to control a large number of autonomous teams, we employ an autonomics framework to manage the networks that represent mission plans and the networks that are composed of human controllers and their autonomous assistants. Machine learning allows us to build models of human and system performance useful for monitoring plans and managing human attention and task loads. Machine learning also aids in the development of tactics that human supervisors can successfully monitor through the command and control system.

  20. Leveraging Interactive Patient Care Technology to Improve Pain Management Engagement.

    PubMed

    Rao-Gupta, Suma; Kruger, David; Leak, Lonna D; Tieman, Lisa A; Manworren, Renee C B

    2018-06-01

    Most children experience pain in hospitals; and their parents report dissatisfaction with how well pain was managed. Engaging patients and families in the development and evaluation of pain treatment plans may improve perceptions of pain management and hospital experiences. The aim of this performance improvement project was to engage patients and families to address hospitalized pediatric patients' pain using interactive patient care technology. The goal was to stimulate conversations about pain management expectations and perceptions of treatment plan effectiveness among patients, parents, and health care teams. Plan-Do-Study-Act was used to design, develop, test, and pilot new workflows to integrate the interactive patient care technology system with the automated medication dispensing system and document actions from both systems into the electronic health record. The pediatric surgical unit and hematology/oncology unit of a free-standing, university-affiliated, urban children's hospital were selected to pilot this performance improvement project because of the high prevalence of pain from surgeries and hematologic and oncologic diseases, treatments, and invasive procedures. Documentation of pain assessments, nonpharmacologic interventions, and evaluation of treatment effectiveness increased. The proportion of positive family satisfaction responses for pain management significantly increased from fiscal year 2014 to fiscal year 2016 (p = .006). By leveraging interactive patient care technologies, patients and families were engaged to take an active role in pain treatment plans and evaluation of treatment outcomes. Improved active communication and partnership with patients and families can effectively change organizational culture to be more sensitive to patients' pain and patients' and families' hospital experiences. Copyright © 2017 American Society for Pain Management Nursing. Published by Elsevier Inc. All rights reserved.

  1. Factors influencing the work efficiency of district health managers in low-resource settings: a qualitative study in Ghana.

    PubMed

    Bonenberger, Marc; Aikins, Moses; Akweongo, Patricia; Wyss, Kaspar

    2016-01-14

    There is increasing evidence that good district management practices can improve health system performance and conversely, that poor and inefficient management practices have detrimental effects. The aim of the present study was to identify factors contributing to inefficient management practices of district health managers and ways to improve their overall efficiency. Nineteen semi-structured interviews were conducted with district health managers in three districts of the Eastern Region in Ghana. The 19 interviews conducted comprised 90% of the managerial workforce in these districts in 2013. A thematic analysis was carried out using the WHO's leadership and management strengthening framework to structure the results. Key factors for inefficient district health management practices were identified to be: human resource shortages, inadequate planning and communication skills, financial constraints, and a narrow decision space that constrains the authority of district health managers and their ability to influence decision-making. Strategies that may improve managerial efficiency at both an individual and organizational level included improvements to planning, communication, and time management skills, and ensuring the timely release of district funds. Filling District Health Management Team vacancies, developing leadership and management skills of district health managers, ensuring a better flow of district funds, and delegating more authority to the districts seems to be a promising intervention package, which may result in better and more efficient management practices and stronger health system performance.

  2. Storm Water Management Model (SWMM): Performance Review and Gap Analysis

    EPA Science Inventory

    The Storm Water Management Model (SWMM) is a widely used tool for urban drainage design and planning. Hundreds of peer-reviewed articles and conference proceedings have been written describing applications of SWMM. This review focused on collecting information on model performanc...

  3. Organization Development: Concept, Process, and Applications in the Department of Defense

    DTIC Science & Technology

    1989-04-01

    collection, the consultant performs an organizational diagnosis in which the focus is on identifying ways to improve the technical, administrative, and...dynamics, and organizational diagnosis . 2. Action/Planning Workshops. This activity consisted of management conferences and management/worker conferences

  4. Individual versus interprofessional team performance in formulating care transition plans: A randomised study of trainees from five professional groups.

    PubMed

    Farrell, Timothy W; Supiano, Katherine P; Wong, Bob; Luptak, Marilyn K; Luther, Brenda; Andersen, Troy C; Wilson, Rebecca; Wilby, Frances; Yang, Rumei; Pepper, Ginette A; Brunker, Cherie P

    2018-05-01

    Health professions trainees' performance in teams is rarely evaluated, but increasingly important as the healthcare delivery systems in which they will practice move towards team-based care. Effective management of care transitions is an important aspect of interprofessional teamwork. This mixed-methods study used a crossover design to randomise health professions trainees to work as individuals and as teams to formulate written care transition plans. Experienced external raters assessed the quality of the written care transition plans as well as both the quality of team process and overall team performance. Written care transition plan quality did not vary between individuals and teams (21.8 vs. 24.4, respectively, p = 0.42). The quality of team process did not correlate with the quality of the team-generated written care transition plans (r = -0.172, p = 0.659). However, there was a significant correlation between the quality of team process and overall team performance (r = 0.692, p = 0.039). Teams with highly engaged recorders, performing an internal team debrief, had higher-quality care transition plans. These results suggest that high-quality interprofessional care transition plans may require advance instruction as well as teamwork in finalising the plan.

  5. Managing effectively in the downsized organization.

    PubMed

    Arnold, Edwin; Pulich, Marcia

    2003-01-01

    Many health care institutions have downsized in recent years for a variety of reasons including cost savings and the need to be proactive in restructuring the organization for more effective performance. In a downsized organization, top management must develop new strategies to enable line managers at all levels to operate effectively. New policies for human resource strategic planning, selective hiring, employee empowerment, training and development, reduction of status distinctions, sharing of appropriate information with employees, and paying for performance must be implemented.

  6. The PISA Project: A Final Report.

    ERIC Educational Resources Information Center

    Buhler-Miko, Marina

    With the support of a 3-year grant from the Fund for The Improvement of Postsecondary Education (FIPSE), the Higher Education Strategic Planning Institute has built a shared experience strategic planning database for college and university top-level management. The Performance Improvement through Strategy Analysis (PISA) program began in 1982 with…

  7. 48 CFR 52.222-46 - Evaluation of Compensation for Professional Employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... obtaining the quality of professional services needed for adequate contract performance. It is therefore in... fairly compensated. As a part of their proposals, offerors will submit a total compensation plan setting... contract. The Government will evaluate the plan to assure that it reflects a sound management approach and...

  8. Mississippi Curriculum Framework for Electrician (Program CIP: 46.0302--Electrician). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for secondary-level courses to prepare Mississippi vocational students for…

  9. 14 CFR 1216.302 - Definition of key terms.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... performing in-house R&D and for planning, managing, and supporting contractor and grantee R&D), and for other... related facility equipment; design of facilities projects; and advance planning related to future facilities needs. (4) Space Flight, Control and Data Communications (SFCDC). Has similar scope to R&D but...

  10. 14 CFR 1216.302 - Definition of key terms.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... performing in-house R&D and for planning, managing, and supporting contractor and grantee R&D), and for other... related facility equipment; design of facilities projects; and advance planning related to future facilities needs. (4) Space Flight, Control and Data Communications (SFCDC). Has similar scope to R&D but...

  11. 14 CFR 1216.302 - Definition of key terms.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... performing in-house R&D and for planning, managing, and supporting contractor and grantee R&D), and for other... related facility equipment; design of facilities projects; and advance planning related to future facilities needs. (4) Space Flight, Control and Data Communications (SFCDC). Has similar scope to R&D but...

  12. U.S. Department of Education Federal Student Aid Five-Year Plan, 2006-2010

    ERIC Educational Resources Information Center

    US Department of Education, 2006

    2006-01-01

    This document reflects Federal Student Aid's solid progress in meeting strategic objectives since becoming a Performance-Based Organization. Specifically, the plan addresses continuing efforts to increase program integrity, improve customer service and achieve measurable results in the management and administration of the Title IV student…

  13. 32 CFR 185.4 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... by or against DoD Forces). (3) Risk (safety of DoD Forces). (4) Cost (including the source of funding... perform its primary mission). (f) DSCA plans shall be compatible with the National Response Framework; the National Incident Management System; all contingency plans for operations in the locations listed in § 185...

  14. 32 CFR 185.4 - Policy.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... by or against DoD Forces). (3) Risk (safety of DoD Forces). (4) Cost (including the source of funding... perform its primary mission). (f) DSCA plans shall be compatible with the National Response Framework; the National Incident Management System; all contingency plans for operations in the locations listed in § 185...

  15. 32 CFR 185.4 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... by or against DoD Forces). (3) Risk (safety of DoD Forces). (4) Cost (including the source of funding... perform its primary mission). (f) DSCA plans shall be compatible with the National Response Framework; the National Incident Management System; all contingency plans for operations in the locations listed in § 185...

  16. A Multi-Objective Method to Align Human Resource Allocation with University Strategy

    ERIC Educational Resources Information Center

    Bouillard, Philippe

    2016-01-01

    Universities are currently under considerable pressure to reach their stakeholders' expectations. Management tools that use strategic plans, key performance indicators and quality assurance methods are increasingly deployed. This paper aims to demonstrate how resource allocation can be aligned with institutional strategic plans with a very simple…

  17. 48 CFR 34.202 - Integrated Baseline Reviews.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... related performance budgets, resources, and schedules. It should provide a mutual understanding of the inherent risks in offerors'/contractors' performance plans and the underlying management control systems... objectives of the scope of work; (2) Adequacy of the time allocated for performing the defined tasks to...

  18. Implementation of new pavement performance prediction models in PMIS : report

    DOT National Transportation Integrated Search

    2012-08-01

    Pavement performance prediction models and maintenance and rehabilitation (M&R) optimization processes : enable managers and engineers to plan and prioritize pavement M&R activities in a cost-effective manner. : This report describes TxDOTs effort...

  19. 5 CFR 1330.402 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Definitions. In this subpart— Appraisal system means the policies, practices, and procedures an agency... authority, for planning, monitoring, developing, evaluating, and rewarding employee performance. This includes appraisal systems and appraisal programs as defined at § 430.203 and performance management...

  20. Plans for Assessing Contractor Performance for the Camp Lemonnier Base Operations Support Contract Needed Improvement

    DTIC Science & Technology

    2015-08-27

    ensure the functional assessment plans ( FAP ) for the three services contained all contractor work requiring assessment, measurable performance...review the FAPs after development and revisions to the FAPs , and did not require additional controls over the contractor assessment process in an...revised as follows: • Business Management System B-14.3 was updated to require the contract officer representative conduct a FAP review to ensure

  1. Multi-Criteria GIS Analyses with the Use of Uavs for the Needs of Spatial Planning

    NASA Astrophysics Data System (ADS)

    Zawieska, D.; Markiewicz, J.; Turek, A.; Bakuła, K.; Kowalczyk, M.; Kurczyński, Z.; Ostrowski, W.; Podlasiak, P.

    2016-06-01

    Utilization of Unmanned Aerial Systems (UAVs) in agriculture, forestry, or other environmental contexts has recently become common. However, in the case of spatial planning, the role of UAVs still seems to be underestimated. At present, sections of municipal development use UAVs mainly for promotional purposes (films, folders, brochures, etc.). The use of UAVs for spatial management provides results, first of all, in the form of savings in human resources and time; however, more frequently, it is also connected with financial savings (given the decreasing cost of UAVs and photogrammetric software). The performed research presented here relates to the possibilities of using UAVs to update planning documents, and, in particular, to update the study of conditions and directions of spatial management and preparation of local plans for physical management. Based on acquired photographs with a resolution of 3 cm, a cloud of points is generated, as well as 3D models and the true orthophotomap. These data allow multi-criteria spatial analyses. Additionally, directions of development and changes in physical management are analysed for the given area.

  2. From Civil Protection Plan to Disaster Management. PETer evolution from GIS tool to multi-area Emergency Management System

    NASA Astrophysics Data System (ADS)

    Frigerio, Simone; Sterlacchini, Simone; Malet, Jean-Philippe; Glade, Thomas

    2010-05-01

    PETer (Protection and Emergency of the Territory) has been developed since 2006 as a tool to manage all the information available to perform a wide range of Civil Protection activities. Based on MapObjects spatial support, it was relied on capacity to manage data from different sources and at different scale, offering practical GIS-tools for a technical and practical use during crisis state. At the first stages of the development, after different assessment, critical on-field analysis and a direct proof on test area, the approach came into sight like a valid database management for the entire dataset, but quite static, not full-blown for every emergency necessity, too complicate and not enough user-friendly, considering people in charge during emergency management, the quick change of state with many parameters involved and also uncertainty, hesitation, confusion or general panic among decision makers. As a second step of research, a more down-to-earth methodology targeted to cope with the aftermath of critical events is presented here. It takes advantage of Geographical Information Systems (GIS), Decision Support Systems (DSS), and Information and Communication Technology (ICT) to prepare, apply and coordinate Civil Protection plans. The main aim was to set up and manage contingency plans in advance; that is, to identify and prepare people in charge to take action to define the activities to be performed, to be aware of available resources and to optimize the communication system among the people involved, in order to efficiently face a prospective crisis phase. A disaster preparedness plan should anticipate the demands for a disaster relief operation and indicate the most effective way of joining those requirements. Through scientific and technical co-operation between public and private research groups, a new platform was planned and set up, in order to test the aims of the project. The application was based on a cooperative organizational structure by which information was managed at different levels, linking all people in decision-making roles: crews in the field, the mobile command post and the control room. The tool automatically performs organizational and operational activities within a Civil Protection plan, in line with enforceable regulations. It couples: data processing capabilities by GIS; workflow management modules by DSS and communication systems by the ICT. More specifically, the work presents the overall concept and the system architecture of a generic decision-support system in progress of development, displaying the aims of emergency management and then shows a DSS first of all for Civil Protection Plan within Disaster Preparedness and Response framework in a Consortium of Mountain Municipalities (Valtellina di Tirano, Central Alps, Northern Italy). A multi-area approach (involving the management of disaster scenarios at the La Valette landslide in the Barcelonnette Basin, South French Alps) has been introduced to calibrate the platform, to compare available dataset, information details, laws in force in different countries, stakeholders' responsibility and end-users' background. Work in progress involves multi-task tools useful in emergency situation, to enforce open-communication devices (SMS automatic platform, SKYPE interface, visual video), integrate existing monitoring system and web-service to tailor open-sharing information with emergency management demand.

  3. Performance evaluation of the NASA/KSC CAD/CAE and office automation LAN's

    NASA Technical Reports Server (NTRS)

    Zobrist, George W.

    1994-01-01

    This study's objective is the performance evaluation of the existing CAD/CAE (Computer Aided Design/Computer Aided Engineering) network at NASA/KSC. This evaluation also includes a similar study of the Office Automation network, since it is being planned to integrate this network into the CAD/CAE network. The Microsoft mail facility which is presently on the CAD/CAE network was monitored to determine its present usage. This performance evaluation of the various networks will aid the NASA/KSC network managers in planning for the integration of future workload requirements into the CAD/CAE network and determining the effectiveness of the planned FDDI (Fiber Distributed Data Interface) migration.

  4. The association between quality of care and the intensity of diabetes disease management programs.

    PubMed

    Mangione, Carol M; Gerzoff, Robert B; Williamson, David F; Steers, W Neil; Kerr, Eve A; Brown, Arleen F; Waitzfelder, Beth E; Marrero, David G; Dudley, R Adams; Kim, Catherine; Herman, William; Thompson, Theodore J; Safford, Monika M; Selby, Joe V

    2006-07-18

    Although disease management programs are widely implemented, little is known about their effectiveness. To determine whether disease management by physician groups is associated with diabetes care processes, control of intermediate outcomes, or the amount of medication used when intermediate outcomes are above target levels. Cross-sectional study. Patients were randomly sampled from 63 physician groups nested in 7 health plans sponsored by Translating Research into Action for Diabetes (87%) and from 4 health plans with individual physician contracts (13%). 8661 adults with diabetes who completed a survey (2000-2001) and had medical record data. Physician group and health plan directors described their organizations' use of physician reminders, performance feedback, and structured care management on a survey; their responses were used to determine measures of intensity of disease management. The current study measured 8 processes of care, including most recent hemoglobin A1c level, systolic blood pressure, serum low-density lipoprotein cholesterol level, and several measures of medication use. Increased use of any of 3 disease management strategies was significantly associated with higher adjusted rates of retinal screening, nephropathy screening, foot examinations, and measurement of hemoglobin A1c levels. Serum lipid level testing and influenza vaccine administration were associated with greater use of structured care management and performance feedback. Greater use of performance feedback correlated with an increased rate of foot examinations (difference, 5 percentage points [95% CI, 1 to 8 percentage points]), and greater use of physician reminders was associated with an increased rate of nephropathy screening (difference, 15 percentage points [CI, 6 to 23 percentage points]). No strategies were associated with intermediate outcome levels or level of medication management. Physician groups were not randomly sampled from population-based listings, and disease management strategies were not randomly allocated across groups. Disease management strategies were associated with better processes of diabetes care but not with improved intermediate outcomes or level of medication management. A greater focus on direct measurement, feedback, and reporting of intermediate outcome levels or of level of medication management may enhance the effectiveness of these programs.

  5. Adaptation: Planning for climate change and its effects on federal lands

    Treesearch

    Marie Oliver; David L. Peterson; Michael J. Furniss

    2012-01-01

    National forest managers are charged with tackling the effects of climate change on the natural resources under their care. The Forest Service National Roadmap for Responding to Climate Change and the Climate Change Performance Scorecard require managers to make significant progress in addressing climate change by 2015. To help land managers meet this challenge,...

  6. New roles for old.

    PubMed

    Edmonstone, J; Chisnell, C

    1992-01-01

    The creation of clinical directorates in acute hospital services has directed attention towards the clinical director role. The two "support" roles of clinical nurse manager and business manager have received less attention. Reports on an action research study into these roles, examining recruitment and selection, monitoring of performance, training needs and succession planning. Deals with the clinical nurse manager role.

  7. Specific application for Oak Ridge National Laboratory dismantlement of Building 3004. Appendix A -- Quality assurance plan; Appendix B -- Records management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This quality assurance (QA) plan defines the QA requirements for the dismantlement and removal of Building 3004 at Oak Ridge National Laboratory (ORNL). The building is a four-story wooden trained structure with wooden siding, which resides approximately 150 ft west of the Bulk Shielding Reactor, and only several feet away from the visitors entrance to the Graphite Reactor museum. Complete descriptions and sketches are in the Performance Specification document for this project. This project is being conducted as a non-CERCLA maintenance action. This plan is an appendix to the QA plan for the ORNL Environmental Restoration (ER) Program. ORNL/ER-225, whichmore » is the source of the project QA requirements, tailors those QA requirements to the specific needs of this project as defined in ORNL/ER-225. Project-specific description and organization are also provided in this plan. Appendix B, Records Management Plan, is included.« less

  8. Development of a business plan for women's health services, using Malcolm Baldrige Performance Excellence Criteria.

    PubMed

    Caramanica, L; Maxwell, S; Curry, S

    2000-06-01

    A new process for business planning at Hartford Hospital was needed to achieve critical business results. This article describes the Hospital's use of the Malcolm Baldrige Performance Excellence Criteria as a way to standardize and improve business planning. Women's Health Services is one of Hartford Hospital's "centers for excellence" and one of the first to use these criteria to improve its service. Staff learned how to build their business plan upon a set of core values and concepts such as customer-driven quality, leadership that sets high expectations, continuous improvement and learning, valuing employees, faster response to market demands, management by fact, and a long-range view of the future.

  9. 78 FR 51275 - Members of Senior Executive Service Performance Review Boards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-20

    ..., Associate CIO, Strategy and Planning (IT) Julieta Garcia, Director, Customer Assistance, Relationships and...) Debra L. Nelson, Director, Management Services (IT) Nina E. Olson, National Taxpayer Advocate (TAS... Management Office (IT) David W. Stender, Associate CIO, Cybersecurity (IT) Peter J. Stipek, Director...

  10. 33 CFR 385.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... performance of the Central and Southern Project and other water management systems in the South Florida... locations and times. Natural system means all land and water managed by the Federal government or the State... System Operating Manual and Project Operating Manuals. Operating Manuals contain water control plans...

  11. 33 CFR 385.3 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... performance of the Central and Southern Project and other water management systems in the South Florida... locations and times. Natural system means all land and water managed by the Federal government or the State... System Operating Manual and Project Operating Manuals. Operating Manuals contain water control plans...

  12. Current management practices and interventions prioritised as part of a nationwide mastitis control plan

    PubMed Central

    Bradley, A. J.; Breen, J. E.; Hudson, C. D.; Green, M. J.

    2016-01-01

    The objectives of this study were to report performance and management data taken from a sample of UK dairy farms that have participated in the Agriculture and Horticulture Development Board Dairy Mastitis Control Plan (DMCP) and to identify important mastitis prevention practices that are not currently widely implemented. A total of 234 UK dairy herds were included in the study from which farm management and udder health data were collected. Herds were grouped according to their mastitis epidemiology and could be classed as (i) environmental dry period (EDP) (i.e. environmental pathogen with majority of infections being acquired during the dry period), (ii) environmental lactation (EL), (iii) contagious dry period (CDP) or (iv) contagious lactation (CL). The results of this study showed that many mastitis-related management practices that are generally considered to be important were not widely performed. A better understanding of those practices not widely adopted by UK dairy farmers at present may aid practitioners in identifying and overcoming potential barriers to improved mastitis control. PMID:26966249

  13. Work plan for the radiological survey for the David Witherspoon, Incorporated, Landfill-1630 site, Knoxville, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    This work plan establishes the methods and requirements for performing a radiological survey at the David Witherspoon, Incorporated, Landfill-1630 Site, Knoxville, Tennessee (DWI 1630 Site) in accordance with requirements under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The radiological survey will identify the radiological contamination level of the equipment and debris stored at the DWI 1630 Site. The data generated from the survey activities will support the decisions for characterization of the equipment/debris and aid in subsequent disposition and waste handling. The survey activities to be performed under this work plan include an equipment radiological survey,more » a walkover survey, and an immunoassay testing for polychlorinated biphenyls (PCBs). This work plan includes a quality assurance (QA)/quality control (QC) project plan, a health and safety (H&S) plan, and a waste management plan.« less

  14. The plan for the economic evaluation of the Public Service Communication Satellite system

    NASA Technical Reports Server (NTRS)

    1977-01-01

    A total plan for the economic evaluation of the PSCS public service communication satellite program within domestic markets is presented. It extends from the present through the planning, performance and evaluation of economic experiments following the launch of the PSCS, and includes the consideration of how the results of these experiments impact the transfer from demonstration to operations. The implementation of this plan will provide NASA with information needed to understand and manage the economic and social impacts of the PSCS program.

  15. The plan for the economic evaluation of the public service communication satellite system

    NASA Technical Reports Server (NTRS)

    1977-01-01

    A plan for the economic evaluation of the Public Service Communications Satellite (PSCS) within domestic markets is presented. It extends through the planning, performance and evaluation of economic experiments following the launch of the PSCS in 1982, and includes the consideration of how the results of these experiments impact the transfer from demonstration to operations. The implementation of this plan will provide information needed to understand and manage the economic and social impacts of the PSCS program.

  16. A health plan report card for dentistry.

    PubMed

    Bader, J D; Shugars, D A; Hayden, W J; White, B A

    1996-01-01

    Employers are demanding information about the performance of the health care plans they purchase for their employees. As a result, "report cards" are now beginning to appear that provide standardized, population-based comparison data for managed medical care plans' quality of care, access and member satisfaction, utilization, and financial status. Although report cards for dental care plans have not yet been developed, it is likely that purchasers will soon expect such performance information. A prototype report card for dental managed care plans is proposed in an effort to facilitate the development of a consensus standard for dentistry. The thirty-eight measures proposed for the report card are designed to be obtainable with a realistic level of additional effort in most dental practices. They were selected to provide data on questions of importance to purchasers and to assess processes and outcomes important because there is strong evidence for their effectiveness. The rationale for the measures is discussed, as are the steps required to develop more sophisticated measures. While the responsibility for the procurement of the information needed for dental report cards will die initially with administrators of dental care plans, it is likely in the near future that individual practitioners will be expected to supply this information to both individual patients and potential contractors.

  17. Evaluation readiness: improved evaluation planning using a data inventory framework.

    PubMed

    Cohen, A B; Hall, K C; Cohodes, D R

    1985-01-01

    Factors intrinsic to many programs, such as ambiguously stated objectives, inadequately defined performance measures, and incomplete or unreliable databases, often conspire to limit the evaluability of these programs. Current evaluation planning approaches are somewhat constrained in their ability to overcome these obstacles and to achieve full preparedness for evaluation. In this paper, the concept of evaluation readiness is introduced as a complement to other evaluation planning approaches, most notably that of evaluability assessment. The basic products of evaluation readiness--the formal program definition and the data inventory framework--are described, along with a guide for assuring more timely and appropriate evaluation response capability to support the decision making needs of program managers. The utility of evaluation readiness for program planning, as well as for effective management, is also discussed.

  18. Automated Procurement System (APS): Project management plan (DS-03), version 1.2

    NASA Technical Reports Server (NTRS)

    Murphy, Diane R.

    1994-01-01

    The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  19. CMS keeps raising the stakes on quality improvement.

    PubMed

    2014-10-01

    A significant portion of the Centers for Medicare & Medicaid Services (CMS) 2015 Inpatient Prospective Payment System final rule focuses on quality and raises the percentage of the Medicare base payment hospitals can lose if they perform poorly. Case managers must be involved with patients from the minute they come in the door, through the hospital stay, and after discharge, experts say. Reimbursement is affected by risk-adjustment, which means case managers must make sure the documentation is as complete and specific as possible to show the full picture of the patient's severity of illness as well as any conditions that were present on admission. As the readmission reduction program expands to add new diagnoses and the penalties for poor performance increase, case managers must change their focus from discharge planning to transition planning that takes into account what resources patients need after discharge, experts say.

  20. 7 CFR 600.3 - Regional offices.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... implementation, consistency, and accountability; (3) Region-wide strategic planning, performance measurement, and operations management; (4) Administrative operations and support; (5) Fund integrity and accountability; (6...

  1. Management systems research study

    NASA Technical Reports Server (NTRS)

    Bruno, A. V.

    1975-01-01

    The development of a Monte Carlo simulation of procurement activities at the NASA Ames Research Center is described. Data cover: simulation of the procurement cycle, construction of a performance evaluation model, examination of employee development, procedures and review of evaluation criteria for divisional and individual performance evaluation. Determination of the influences and apparent impact of contract type and structure and development of a management control system for planning and controlling manpower requirements.

  2. Safe teleradiology: information assurance as project planning methodology

    NASA Astrophysics Data System (ADS)

    Collmann, Jeff R.; Alaoui, Adil; Nguyen, Dan; Lindisch, David

    2003-05-01

    This project demonstrates use of OCTAVE, an information security risk assessment method, as an approach to the safe design and planning of a teleradiology system. By adopting this approach to project planning, we intended to provide evidence that including information security as an intrinsic component of project planning improves information assurance and that using information assurance as a planning tool produces and improves the general system management plan. Several considerations justify this approach to planning a safe teleradiology system. First, because OCTAVE was designed as a method for retrospectively assessing and proposing enhancements for the security of existing information management systems, it should function well as a guide to prospectively designing and deploying a secure information system such as teleradiology. Second, because OCTAVE provides assessment and planning tools for use primarily by interdisciplinary teams from user organizations, not consultants, it should enhance the ability of such teams at the local level to plan safe information systems. Third, from the perspective of sociological theory, OCTAVE explicitly attempts to enhance organizational conditions identified as necessary to safely manage complex technologies. Approaching information system design from the perspective of information security risk management proactively integrates health information assurance into a project"s core. This contrasts with typical approaches that perceive "security" as a secondary attribute to be "added" after designing the system and with approaches that identify information assurance only with security devices and user training. The perspective of health information assurance embraces so many dimensions of a computerized health information system"s design that one may successfully deploy a method for retrospectively assessing information security risk as a prospective planning tool. From a sociological perspective, this approach enhances the general conditions as well as establishes specific policies and procedures for reliable performance of health information assurance.

  3. Mississippi Curriculum Framework for Metal Trades (Program CIP: 48.0590--Metal Trades). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for metal trades I, IIA (advanced welding), and IIB (advanced machine shop).…

  4. Succession Planning and Management: A Guide to Organizational Systems and Practices

    ERIC Educational Resources Information Center

    Berke, David

    2005-01-01

    The purpose of succession-related practices is to ensure that there are ready replacements for key positions in an organization so that turnover will not negatively affect the organization's performance. CCL first published an annotated bibliography on succession planning in 1995. That bibliography focused primarily on the link between succession…

  5. Mississippi Curriculum Framework for Horticulture (Program CIP: 01.0601--Horticulture Serv. Op. & Mgmt., Gen.). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for horticulture I and II. Presented first are a program description and…

  6. Mississippi Curriculum Framework for Agriculture Production (Program CIP: 01.0301--Agricultural Prod. Workers & Mgrs.). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for agriculture production I and II. Presented first are a program…

  7. Mississippi Curriculum Framework for Building Trades (Program CIP: 46.0490--Building Trades, General). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for two secondary-level courses in the building trades: building trades I and…

  8. Mississippi Curriculum Framework for Welding (Program CIP: 48.0508--Welder/Welding Technologist). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for welding I and II. Presented first are a program description and course…

  9. Mississippi Curriculum Framework for General Drafting (Program CIP: 48.0101--Drafting, General). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for two secondary-level courses in drafting: drafting I and II. Presented…

  10. Mississippi Curriculum Framework for Agriscience (Program CIP: 02.0101--Agriculture Science). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for agriscience I and II. Presented first are a program description and…

  11. 40 CFR 264.1064 - Recordkeeping requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... facility (e.g., identify the hazardous waste management unit on a facility plot plan). (iii) Type of... schedule as specified in § 264.1033(a)(2). (3) Where an owner or operator chooses to use test data to... device, a performance test plan as specified in § 264.1035(b)(3). (4) Documentation of compliance with...

  12. 40 CFR 264.1064 - Recordkeeping requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... facility (e.g., identify the hazardous waste management unit on a facility plot plan). (iii) Type of... schedule as specified in § 264.1033(a)(2). (3) Where an owner or operator chooses to use test data to... device, a performance test plan as specified in § 264.1035(b)(3). (4) Documentation of compliance with...

  13. 40 CFR 264.1064 - Recordkeeping requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... facility (e.g., identify the hazardous waste management unit on a facility plot plan). (iii) Type of... schedule as specified in § 264.1033(a)(2). (3) Where an owner or operator chooses to use test data to... device, a performance test plan as specified in § 264.1035(b)(3). (4) Documentation of compliance with...

  14. 40 CFR 264.1064 - Recordkeeping requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... facility (e.g., identify the hazardous waste management unit on a facility plot plan). (iii) Type of... schedule as specified in § 264.1033(a)(2). (3) Where an owner or operator chooses to use test data to... device, a performance test plan as specified in § 264.1035(b)(3). (4) Documentation of compliance with...

  15. Mississippi Curriculum Framework for Automotive Mechanics (Program CIP: 47.0604--Auto/Automotive Mechanic/Tech). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for automotive mechanics I and II. Presented first are a program description…

  16. Mississippi Curriculum Framework for Allied Health (Program CIP: 51.1699--Nursing, Other). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for allied health I and II. Presented first are a program description and…

  17. Mississippi Curriculum Framework for Introduction to Agriscience (Program CIP: 02.9990--Introduction to Agriculture Science). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for the introduction to agriscience program. Presented first are a program…

  18. Mississippi Curriculum Framework for Electronics (Program CIP: 47.0190--Electronics (Secondary)). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for two secondary-level courses in electronics: electronics I and II.…

  19. Mississippi Curriculum Framework for Residential Carpentry (Program CIP: 46.0201--Carpenter). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for two secondary-level courses in carpentry: carpentry I and II. Presented…

  20. 75 FR 17151 - Agency Information Collection Activities: Submission for OMB Review; Comment Request, OMB No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-05

    .... 1660--NEW; FEMA Form 089-23, Buffer Zone Plan; FEMA Form 089-23A, Vulnerability Reduction Purchasing...-23A, Vulnerability Reduction Purchasing Plan. Abstract: The information collection activity is the... enables FEMA to evaluate applications and make award decisions, monitor ongoing performance and manage the...

  1. The impact of health plan report cards on managed care enrollment.

    PubMed

    Scanlo, Dennis P; Chernew, Michael; Mclaughlin, Catherine; Solon, Gary

    2002-01-01

    How does the release of health plan performance ratings influence employee health plan choice? A natural experiment at General Motors (GM) Corporation provides valuable evidence on this question. During the 1997 open enrollment period, GM disseminated a health plan report card for the first time. By comparing 1996 and 1997 enrollment patterns, our analysis estimates the impact of the report card information while accounting for fixed, unobserved plan traits. Results indicate that employees are less likely to enroll in plans requiring relatively high out-of-pocket contributions. Results with respect to report card ratings suggest that individuals avoid health plans with many below average ratings.

  2. Mastering the management system.

    PubMed

    Kaplan, Robert S; Norton, David P

    2008-01-01

    Companies have always found it hard to balance pressing operational concerns with long-term strategic priorities. The tension is critical: World-class processes won't lead to success without the right strategic direction, and the best strategy in the world will get nowhere without strong operations to execute it. In this article, Kaplan, of Harvard Business School, and Norton, founder and director of the Palladium Group, explain how to effectively manage both strategy and operations by linking them tightly in a closed-loop management system. The system comprises five stages, beginning with strategy development, which springs from a company's mission, vision, and value statements, and from an analysis of its strengths, weaknesses, and competitive environment. In the next stage, managers translate the strategy into objectives and initiatives with strategy maps, which organize objectives by themes, and balanced scorecards, which link objectives to performance metrics. Stage three involves creating an operational plan to accomplish the objectives and initiatives; it includes targeting process improvements and preparing sales, resource, and capacity plans and dynamic budgets. Managers then put plans into action, monitoring their effectiveness in stage four. They review operational, environmental, and competitive data; assess progress; and identify barriers to execution. In the final stage, they test the strategy, analyzing cost, profitability, and correlations between strategy and performance. If their underlying assumptions appear faulty, they update the strategy, beginning another loop. The authors present not only a comprehensive blueprint for successful strategy execution but also a managerial tool kit, illustrated with examples from HSBC Rail, Cigna Property and Casualty, and Store 24. The kit incorporates leading management experts' frameworks, outlining where they fit into the management cycle.

  3. Trial of an electronic decision support system to facilitate shared decision making in community mental health.

    PubMed

    Woltmann, Emily M; Wilkniss, Sandra M; Teachout, Alexandra; McHugo, Gregory J; Drake, Robert E

    2011-01-01

    Involvement of community mental health consumers in mental health decision making has been consistently associated with improvements in health outcomes. Electronic decision support systems (EDSSs) that support both consumer and provider decision making may be a sustainable way to improve dyadic communication in a field with approximately 50% workforce turnover per year. This study examined the feasibility of such a system and investigated proximal outcomes of the system's performance. A cluster randomized design was used to evaluate an EDSS at three urban community mental health sites. Case managers (N=20) were randomly assigned to the EDSS-supported planning group or to the usual care planning group. Consumers (N=80) were assigned to the same group as their case managers. User satisfaction with the care planning process was assessed for consumers and case managers (possible scores range from 1 to 5, with higher summary scores indicating more satisfaction). Recall of the care plan was assessed for consumers. Linear regression with adjustment for grouping by worker was used to assess satisfaction scores. A Wilcoxon rank-sum test was used to examine knowledge of the care plan. Compared with case managers in the control group, those in the intervention group were significantly more satisfied with the care planning process (mean ± SD score=4.0 ± .5 versus 3.3 ± .5; adjusted p=.01). Compared with consumers in the control group, those in the intervention group had significantly greater recall of their care plans three days after the planning session (mean proportion of plan goals recalled=75% ± 28% versus 57% ± 32%; p=.02). There were no differences between the clients in the intervention and control groups regarding satisfaction. This study demonstrated that clients can build their own care plans and negotiate and revise them with their case managers using an EDSS.

  4. 20 CFR 632.23 - Termination and corrective action of a CAP and/or Master Plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... substantiates serious management, fiscal and/or performance problems, information from the Inspector General or gained through incident reports of poor performance, serious administrative problems and/or inability to... termination: (1) Poor performance and inability to meet Federal standards related to such debt collection...

  5. 36 CFR 9.13 - Performance bond.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Performance bond. 9.13 Section 9.13 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT Mining and Mining Claims § 9.13 Performance bond. (a) Upon approval of a plan of...

  6. 36 CFR 9.13 - Performance bond.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Performance bond. 9.13 Section 9.13 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT Mining and Mining Claims § 9.13 Performance bond. (a) Upon approval of a plan of...

  7. Liquid rocket booster study. Volume 2, book 3, appendices 2-5: PPIP, transition plan, AMOS plan, and environmental analysis

    NASA Technical Reports Server (NTRS)

    1988-01-01

    This Preliminary Project Implementation Plan (PPIP) was used to examine the feasibility of replacing the current Solid Rocket Boosters on the Space Shuttle with Liquid Rocket Boosters (LRBs). The need has determined the implications of integrating the LRB with the Space Transportation System as the earliest practical date. The purpose was to identify and define all elements required in a full scale development program for the LRB. This will be a reference guide for management of the LRB program, addressing such requirement as design and development, configuration management, performance measurement, manufacturing, product assurance and verification, launch operations, and mission operations support.

  8. Report: Lack of Project Plan Resulted in Transition and Contractor Performance Problems for the Institutional Controls Tracking System

    EPA Pesticide Factsheets

    Report #09-P-0128, March 25, 2009. Lack of compliance with established project management procedures resulted in transitional problems in 2005 that delayed ICTS development and negatively affected contractor performance.

  9. 15 CFR 291.2 - Environmental integration projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... activity, and “customer satisfaction” measures of performance. (5) Management experience and plans... defined. The manufacturing center must demonstrate that it understands the populations environmentally...

  10. Strategic Air Traffic Planning Using Eulerian Route Based Modeling and Optimization

    NASA Astrophysics Data System (ADS)

    Bombelli, Alessandro

    Due to a soaring air travel growth in the last decades, air traffic management has become increasingly challenging. As a consequence, planning tools are being devised to help human decision-makers achieve a better management of air traffic. Planning tools are divided into two categories, strategic and tactical. Strategic planning generally addresses a larger planning domain and is performed days to hours in advance. Tactical planning is more localized and is performed hours to minutes in advance. An aggregate route model for strategic air traffic flow management is presented. It is an Eulerian model, describing the flow between cells of unidirectional point-to-point routes. Aggregate routes are created from flight trajectory data based on similarity measures. Spatial similarity is determined using the Frechet distance. The aggregate routes approximate actual well-traveled traffic patterns. By specifying the model resolution, an appropriate balance between model accuracy and model dimension can be achieved. For a particular planning horizon, during which weather is expected to restrict the flow, a procedure for designing airborne reroutes and augmenting the traffic flow model is developed. The dynamics of the traffic flow on the resulting network take the form of a discrete-time, linear time-invariant system. The traffic flow controls are ground holding, pre-departure rerouting and airborne rerouting. Strategic planning--determining how the controls should be used to modify the future traffic flow when local capacity violations are anticipated--is posed as an integer programming problem of minimizing a weighted sum of flight delays subject to control and capacity constraints. Several tests indicate the effectiveness of the modeling and strategic planning approach. In the final, most challenging, test, strategic planning is demonstrated for the six western-most Centers of the 22-Center national airspace. The planning time horizon is four hours long, and there is weather predicted that causes significant delays to the scheduled flights. Airborne reroute options are computed and added to the route model, and it is shown that the predicted delays can be significantly reduced. The test results also indicate the computational feasibility of the approach for a planning problem of this size.

  11. A Study of the Impacts of Selected Products Developed by the National Center for Higher Education Management Systems.

    ERIC Educational Resources Information Center

    Rodgers, Kenneth W.; Rhodes, Isabelle N.

    The impact of NCHEMS (National Center for Higher Education Management Systems) products upon planning and management tasks is examined in this study performed at a sample of 126 institutions. The institutions have used one or more of the following NCHEMS products: Program Classification of Structure (PCS); Resource Requirements Prediction Model…

  12. An Analysis of Total Quality Management in Aeronautical Systems Division

    DTIC Science & Technology

    1991-09-01

    Annual Review ..... ......... . 3-51 Disease 4: Mobility of Top Management ................... .3-52 Disease 5: Running a Company on Visible Figures...range Planning .................... 5-4 Merit Rating Systems and Annual Evaluation of Performance .. ..... ........... 5-4 Mobility of Management...generations of careful quality-conscious buyers. The indus- trial engine ran on the talents of designers, packagers, and advertisers . Turning out new

  13. Preablation 131-I scans with SPECT/CT contribute to thyroid cancer risk stratification and 131-I therapy planning.

    PubMed

    Avram, Anca M; Esfandiari, Nazanene H; Wong, Ka Kit

    2015-05-01

    The use of preablation diagnostic radioiodine scans for risk stratification and radioiodine therapy planning for differentiated thyroid cancer (DTC) remains controversial. The objective was to assess the contribution of preablation diagnostic 131-I scans with SPECT/CT (Dx 131-I scan) to (1) the risk stratification and (2) the postoperative management of DTC. The study was designed as a prospective sequential patient series. The study was conducted at a University hospital. Three hundred twenty patients (pts) with DTC (219F; 101M, mean age 47.3 ± 16.4 y, range 10-90) were studied. Using clinical and histopathology information an endocrinologist performed risk stratification and determined postoperative management with respect to radioiodine therapy (RAI) planning. The decision to withhold or to administer RAI, and the recommended low, medium or high therapeutic 131-I activity were recorded. Dx 131-I scans were performed and interpreted by two nuclear medicine physicians as showing thyroid remnant, cervical nodal, or distant metastases. The endocrinologist then reperformed risk stratification and reformulated management after consideration of Dx 131-I scans and stimulated thyroglobulin (Tg) information. Main outcome measures were changes in risk stratification and management after Dx 131-I scans. Detection of unsuspected nodal and distant metastases and elevated stimulated Tg levels resulted in a change in the estimated risk of recurrence in 15% of patients, and management in 31% of patients, as compared to initial risk stratification and management based on histopathology alone. Both imaging data and stimulated thyroglobulin levels acquired at the time of Dx 131-I scans are consequential for 131-I therapy planning, providing information that changes risk stratification in 15% of patients as compared to recurrence risk estimation based on histopathology alone. Dx 131-I scans contribute to risk stratification by defining residual nodal and distant metastatic disease, changing clinical management in 29.4% of patients.

  14. A framework to assess management performance in district health systems: a qualitative and quantitative case study in Iran.

    PubMed

    Tabrizi, Jafar Sadegh; Gholipour, Kamal; Iezadi, Shabnam; Farahbakhsh, Mostafa; Ghiasi, Akbar

    2018-01-01

    The aim was to design a district health management performance framework for Iran's healthcare system. The mixed-method study was conducted between September 2015 and May 2016 in Tabriz, Iran. In this study, the indicators of district health management performance were obtained by analyzing the 45 semi-structured surveys of experts in the public health system. Content validity of performance indicators which were generated in qualitative part were reviewed and confirmed based on content validity index (CVI). Also content validity ratio (CVR) was calculated using data acquired from a survey of 21 experts in quantitative part. The result of this study indicated that, initially, 81 indicators were considered in framework of district health management performance and, at the end, 53 indicators were validated and confirmed. These indicators were classified in 11 categories which include: human resources and organizational creativity, management and leadership, rules and ethics, planning and evaluation, district managing, health resources management and economics, community participation, quality improvement, research in health system, health information management, epidemiology and situation analysis. The designed framework model can be used to assess the district health management and facilitates performance improvement at the district level.

  15. SU-F-P-03: Management of Time to Treatment Inititation: Case for An Electronic Whiteboard

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adnani, N

    2016-06-15

    Purpose: To determine if data mining of an electronic whiteboard improves the management of the Time to Treatment Initiation (TTI) in radiation oncology. Methods: An electronic whiteboard designed to help in managing the planning workflow and improves communication regarding patient planning progress was used to record the dates at which each phase of the planning process began or completed. These are CT Sim date, Plan Start, Physician Review, Physicist Review, Approval for Treatment Delivery, Setup or Verification of Simulation. Results: During clinical implementation, the electronic whiteboard was able to fulfill its primary objective of providing a transparent account of themore » planning progress of each patient. Peer pressure also meant that individual tasks, such as contouring, were easily brought to the attention of the responsible party and prioritized accordingly. Data mining to analyze the electronic whiteboard per patient (figure 1), per diagnosis (figure 2), per treatment modality (figure 3), per physician (figure 4), per planner (figure 5), etc., added another sophisticated tool in the management of Time to Treatment Initiation without compromising quality of the plans being generated. A longer than necessary time between CT Sim and Plan Start can be discussed among the members of the treatment team as an indication of inadequate/outdated CT Simulator, Contouring Tools, Image Fusion Tools, Other Imaging Studies (MRI, PET/CT) performed, etc. The same for the Plan Start to Physician Review where an extended time than expected may be due unrealistic planning goals, limited planning system features, etc. Conclusion: An Electronic Whiteboard in radiation oncology is not only helping with organizing planning workflow, it is also a potent tool that can be used to reduce the Time to Treatment Initiation by providing the clinic with hard data about the duration of each phase treatment planning as a function of different variable affecting the planning process. The work is supported by the Global Medical Physics Institute.« less

  16. A failure management prototype: DR/Rx

    NASA Technical Reports Server (NTRS)

    Hammen, David G.; Baker, Carolyn G.; Kelly, Christine M.; Marsh, Christopher A.

    1991-01-01

    This failure management prototype performs failure diagnosis and recovery management of hierarchical, distributed systems. The prototype, which evolved from a series of previous prototypes following a spiral model for development, focuses on two functions: (1) the diagnostic reasoner (DR) performs integrated failure diagnosis in distributed systems; and (2) the recovery expert (Rx) develops plans to recover from the failure. Issues related to expert system prototype design and the previous history of this prototype are discussed. The architecture of the current prototype is described in terms of the knowledge representation and functionality of its components.

  17. Medication Management: The Macrocognitive Workflow of Older Adults With Heart Failure.

    PubMed

    Mickelson, Robin S; Unertl, Kim M; Holden, Richard J

    2016-10-12

    Older adults with chronic disease struggle to manage complex medication regimens. Health information technology has the potential to improve medication management, but only if it is based on a thorough understanding of the complexity of medication management workflow as it occurs in natural settings. Prior research reveals that patient work related to medication management is complex, cognitive, and collaborative. Macrocognitive processes are theorized as how people individually and collaboratively think in complex, adaptive, and messy nonlaboratory settings supported by artifacts. The objective of this research was to describe and analyze the work of medication management by older adults with heart failure, using a macrocognitive workflow framework. We interviewed and observed 61 older patients along with 30 informal caregivers about self-care practices including medication management. Descriptive qualitative content analysis methods were used to develop categories, subcategories, and themes about macrocognitive processes used in medication management workflow. We identified 5 high-level macrocognitive processes affecting medication management-sensemaking, planning, coordination, monitoring, and decision making-and 15 subprocesses. Data revealed workflow as occurring in a highly collaborative, fragile system of interacting people, artifacts, time, and space. Process breakdowns were common and patients had little support for macrocognitive workflow from current tools. Macrocognitive processes affected medication management performance. Describing and analyzing this performance produced recommendations for technology supporting collaboration and sensemaking, decision making and problem detection, and planning and implementation.

  18. Strengthening Financial Management. New Directions for Community Colleges, Number 50.

    ERIC Educational Resources Information Center

    Campbell, Dale F., Ed.

    1985-01-01

    This collection of essays examines strategies to strengthen financial management in the community colleges from the perspective of college finance and administrative support officers. Part I focuses on selected role functions that college business officers perform, containing "Integrating Academic Planning and Budgeting," by Byron N. McClenney and…

  19. 48 CFR 52.222-46 - Evaluation of Compensation for Professional Employees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contract. The Government will evaluate the plan to assure that it reflects a sound management approach and... understanding of work to be performed and should indicate the capability of the proposed compensation structure... of sound management judgment and lack of understanding of the requirement. (c) The Government is...

  20. Commonality in Military Equipment. A Framework to Improve Acquisition Decisions

    DTIC Science & Technology

    2008-01-01

    Improving Acquisition Decisions Chopra, Sunil , and Peter Meindl, Supply Chain Management : Strategy, Planning, Operation, Upper Saddle River, N.J...Personnel Costs in Managing Suppliers and Ordering Parts. The effort to perform these activities may be reduced and simplified through a smaller supply ...a Combined MOS on Mechanic Supply Variability

  1. Improving Program Performance through Management Information. A Workbook.

    ERIC Educational Resources Information Center

    Bienia, Nancy

    Designed specifically for state and local managers and supervisors who plan, direct, and operate child support enforcement programs, this workbook provides a four-part, step-by-step process for identifying needed information and methods of using the information to operate an effective program. The process consists of: (1) determining what…

  2. Data Validation Package August 2015 Groundwater Sampling at the Grand Junction, Colorado, Disposal Site October 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Frazier, William; Baur, Gary

    2015-11-03

    The 1998 Interim Long-Term Surveillance Plan for the Cheney Disposal Site Near Grand Junction, Colorado, requires annual monitoring to assess the performance of the disposal cell. Monitoring wells 0731, 0732 and 0733 were sampled as specified in the plan. Sampling and analyses were conducted in accordance with Sampling and Analysis Plan for the U.S. Department of Energy Office of Legacy Management Sites.

  3. Apollo/Skylab suit program management systems study. Volume 2: Cost analysis

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The business management methods employed in the performance of the Apollo-Skylab Suit Program are studied. The data accumulated over the span of the contract as well as the methods used to accumulate the data are examined. Management methods associated with the monitoring and control of resources applied towards the performance of the contract are also studied and recommended upon. The primary objective is the compilation, analysis, and presentation of historical cost performance criteria. Cost data are depicted for all phases of the Apollo-Skylab program in common, meaningful terms, whereby the data may be applicable to future suit program planning efforts.

  4. [Management of the risks associated with allergens in school canteens in Barcelona (Spain)].

    PubMed

    Caballé-Gavaldà, Laura; García-Cid, Ester; Fontcuberta-Famadas, Mireia; Balfagón-Marzal, Pere; Durán-Neira, Julia

    2014-01-01

    To determine demand for special meals and their types for students with food allergies or intolerances (FAI) in school canteens in Barcelona (Spain) during the 2011-12 school year, and to ascertain the degree of implementation of self-assessment plans and preventive measures for the management of allergens, and the relationships between the application of such measures and other variables. A descriptive study was performed of a representative sample of schools (n=129). The dependent variables collected data on the schools and students, the level of demand for special meals, and the implementation of preventive measures. Independent variables consisted of canteen management, the number of users, and whether self-assessment plans were implemented. For those schools that prepared meals (n=92), an index was calculated from the questions on preventive measures. Student t-tests were used to compare the means of the indices with stratification by the independent variables. A total of 89% of schools served special meals for students with FAI (1,507 special meals per day, 5% of all meals) and 65% had no allergen control plan. The mean of the indices was 11.6 out of 17. Externally managed canteens, with more users and with self-assessment plans, implemented more preventive measures for allergen management (p<0.05). A high proportion of schools report carrying out preventive measures in the process of preparing and serving special meals. Those with self-assessment plans have better preventive practices. To manage this food-related risk, food hygiene inspection services should promote the implementation of allergen control plans in school canteens. Copyright © 2014 SESPAS. Published by Elsevier Espana. All rights reserved.

  5. Strategic planning for employee happiness: a business goal for human service organizations.

    PubMed

    Howard, B; Gould, K E

    2000-09-01

    Employee happiness can impact substantially on an organization's performance. It can influence employee retention, absenteeism, and work performance. Because of this importance, such happiness is inseparable from the real business of the organization and should be considered a business goal. Implementation and development of the strategic plan associated with this goal becomes the responsibility of a highly placed project team that has as its mission ensuring employee satisfaction. The strategic plan includes procedures that allow management to listen effectively to employees, assessing and responding to their values and needs. In this paper we discuss the workforce and environmental characteristics that are involved planning for employee happiness and the steps in creating an organizational culture in which this can become a business goal.

  6. New thinking on how to link executive pay with performance.

    PubMed

    Rappaport, A

    1999-01-01

    As the stock market began its ascent in the mid-1990s, executive pay--always the subject of heated debate--mounted along with it. That's because among the largest U.S. companies, stock options now account for more than half of total CEO compensation and about 30% of senior operating managers' pay. One problem became particularly clear during the bull market's astonishing run: even below-average performers reap huge gains from stock options when the market is rising rapidly. The author proposes steps to close the gap between existing compensation practices and those needed to promote higher levels of achievement at all levels of the corporation. For top managers, he recommends replacing conventional stock options with options that are tied to a market or peer index. Below-average performers would not be rewarded under such plans; superior performers could, depending on the way plans were structured, receive even more. He notes that managers at the business unit level should not be judged on the company's stock price--over which they have little control--and advocates an approach that accurately measures the value added by each unit. Finally, he suggests how certain indicators of value can be used to measure the contribution of frontline managers and employees. The concept of pay for performance has gained wide acceptance, but the link between incentive pay and superior performance is still too weak. Reforms must be adopted at all levels of the organization. Shareholders will applaud changes in pay schemes that motivate companies to deliver more value.

  7. 48 CFR 1609.7101-2 - Community-rated carrier performance factors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Community-rated carrier performance factors. 1609.7101-2 Section 1609.7101-2 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION ACQUISITION PLANNING...

  8. 48 CFR 1609.7101-2 - Community-rated carrier performance factors.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Community-rated carrier performance factors. 1609.7101-2 Section 1609.7101-2 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION ACQUISITION PLANNING...

  9. 48 CFR 1609.7101-2 - Community-rated carrier performance factors.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Community-rated carrier performance factors. 1609.7101-2 Section 1609.7101-2 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION ACQUISITION PLANNING...

  10. Using Ratio Analysis to Evaluate Financial Performance.

    ERIC Educational Resources Information Center

    Minter, John; And Others

    1982-01-01

    The ways in which ratio analysis can help in long-range planning, budgeting, and asset management to strengthen financial performance and help avoid financial difficulties are explained. Types of ratios considered include balance sheet ratios, net operating ratios, and contribution and demand ratios. (MSE)

  11. Turn "B" Teachers into "A+"s.

    ERIC Educational Resources Information Center

    Bartolo, Don

    1988-01-01

    Valued, experienced teachers can give superior classroom performances with help from a dedicated principal and a performance management plan that involves (1) pinpointing the teaching skill needing improvement; (2) supportive confrontation; (3) mutual discussion of alternative solutions; (4) definition of responsibilities; (5) followup and…

  12. 48 CFR 31.001 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... determine the actuarial value of the assets of a pension plan. Actuarial gain and loss means the effect on... cost accounting period. Cost objective means (except for subpart 31.6) a function, organizational... operations. It usually performs management, supervisory, or administrative functions, and may also perform...

  13. 48 CFR 31.001 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... determine the actuarial value of the assets of a pension plan. Actuarial gain and loss means the effect on... cost accounting period. Cost objective means (except for subpart 31.6) a function, organizational... operations. It usually performs management, supervisory, or administrative functions, and may also perform...

  14. 48 CFR 31.001 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... determine the actuarial value of the assets of a pension plan. Actuarial gain and loss means the effect on... cost accounting period. Cost objective means (except for subpart 31.6) a function, organizational... operations. It usually performs management, supervisory, or administrative functions, and may also perform...

  15. Coordination of short-term and long-term mitigation measures of hydro-meteorological risks: the importance of establishing a link between emergency management and spatial planning

    NASA Astrophysics Data System (ADS)

    Prenger-Berninghoff, Kathrin; Cortes, V. Juliette; Aye, Zar Chi; Sprague, Teresa

    2013-04-01

    The management of natural hazards involves, as generally known, the four stages of the risk management cycle: Prevention, preparedness, response and recovery. Accordingly, the mitigation of disasters can be performed in terms of short-term and long-term purposes. Whereas emergency management or civil protection helps to strengthen a community's capacity to be better prepared for natural hazards and to better respond in case a disaster strikes, thus addressing the short-term perspective, spatial planning serves long-term planning goals and can therefore implement long-term prevention measures. A purposefully applied risk mitigation strategy requires coordination of short-term and long-term mitigation measures and thus an effective coordination of emergency management and spatial planning. Several actors are involved in risk management and should consequently be linked throughout the whole risk management cycle. However, these actors, partly because of a historically fragmented administrative system, are hardly connected to each other, with spatial planning only having a negligible role compared to other actors1, a problem to which Young (2002) referred to as the "problem of interplay". In contrast, information transfer and decision-taking happen at the same time and are not coordinated among different actors. This applies to the prevention and preparedness phase as well as to the recovery phase, which basically constitutes the prevention phase for the next disaster2. Since investments in both risk prevention and emergency preparedness and response are considered necessary, a better coordination of the two approaches is required. In this regard, Decision Support Systems (DSS) can be useful in order to provide support in the decision-making aspect of risk management. The research work currently undertaken examines the problem of interplay in the four case study areas of the Marie Curie ITN, CHANGES3. The link between different risk management actors will be explored by means of exploratory questionnaires and interviews with government agencies, local administrations, community and research organizations on each study site. First results provided will address the general role of spatial planning in risk management. Additionally, preliminary observations are made in regard to the coordination of emergency preparedness and long-term spatial planning activities. The observations consider that integration facilitates proactive strategies that aim at preventing disaster occurrence and promote interaction between involved parties. Finally, consideration is given to the potential use of a DSS tool to cover both aspects of spatial planning and emergency management in the risk management cycle.

  16. A model of the impact of reimbursement schemes on health plan choice.

    PubMed

    Keeler, E B; Carter, G; Newhouse, J P

    1998-06-01

    Flat capitation (uniform prospective payments) makes enrolling healthy enrollees profitable to health plans. Plans with relatively generous benefits may attract the sick and fail through a premium spiral. We simulate a model of idealized managed competition to explore the effect on market performance of alternatives to flat capitation such as severity-adjusted capitation and reduced supply-side cost-sharing. In our model flat capitation causes severe market problems. Severity adjustment and to a lesser extent reduced supply-side cost-sharing improve market performance, but outcomes are efficient only in cases in which people bear the marginal costs of their choices.

  17. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...

  18. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...

  19. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...

  20. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...

  1. Evaluation of an integrated adherence program aimed to increase Medicare Part D star rating measures.

    PubMed

    Leslie, R Scott; Tirado, Breanne; Patel, Bimal V; Rein, Philip J

    2014-12-01

    The Centers for Medicare Medicaid Services (CMS) Plan Quality and Performance Program, or Star Ratings Program, allows Medicare beneficiaries to compare quality of care among available Medicare Advantage prescription drug (MA-PD) plans and stand-alone prescription drug plans (PDPs). Health plans have increased intervention efforts and applied existing care management infrastructure as an approach to improving member medication adherence and subsequent Part D star rating performance. Independent Care Health Plan (iCare), an MA-PD plan; MedImpact Healthcare Systems, Inc. (MedImpact), a pharmacy benefits manager; and US MED, a mail order pharmacy, partnered to engage and enroll iCare's dual-eligible special needs population in an intervention designed to improve patient medication adherence and health plan performance for 3 Part D patient safety outcome measures: Medication Adherence for Oral Diabetes Medications (ODM), Medication Adherence for Hypertension (HTN), and Medication Adherence for Cholesterol (CHOL). To (a) assess the effectiveness of a coordinated member-directed medication adherence intervention and (b) determine the overall impact of the intervention on adherence rates and CMS Part D star rating adherence measures.  Administrative pharmacy claims and health plan eligibility data from MedImpact's databases were used to identify members using 3 target medication classes. Adherence was estimated by the proportion of days covered (PDC) for all members. Those members considered at high risk for nonadherence were prioritized for care management services. Risk factors were based on members' use of more than 1 target medication class, newly started therapy, and suboptimal adherence (PDC  less than  80%) in the most recent 6-month period. Data files listing member adherence rates and contact information were formatted and loaded monthly into iCare's care management system, which triggered an alert for care coordinators to counsel members on the importance of adherence and offer the members an option for monthly 30-day supply medication delivery via US MED. Member adherence rates were calculated 9 months pre- and postimplementation for all members and adjusted by length of member enrollment based on CMS technical specifications. Regression analysis assessed pre-post changes in rates comparing 2 intervention groups: (1) members receiving iCare counseling only (iCare-only) and (2) members receiving counseling and medication delivery (iCare + US MED). To evaluate the overall impact of the intervention, iCare's adherence rates and iCare's measure-specific star ratings for the 2011 and 2012 calendar years (CMS measurement years) were compared with the national MA-PD plan contract average and with a health plan similar in member characteristics but without adherence intervention exposure.  A total of 2,700 members were initially targeted for referral to iCare care management and US MED customer service specialist teams. Between April 2012 (implementation date) and January 2013, 1,302 (48.2%) members enrolled in the US MED component of the intervention. Seventy-six percent of identified members were nonadherent (PDC  less than  80%) to 1 of the 3 target medication classes, and 32% of members were nonadherent to more than 1 target medication class. Pre-post absolute average adherence rates increased for the iCare-only group (ODM = 15.1, HTN = 10.1, CHOL = 13.6) and the iCare-US MED group (ODM = 30.9, HTN = 25.5, CHOL = 29.4).  From 2011 to 2012, iCare adherence rates increased by absolute differences of 15.2, 9.2, and 10.1 percentage points for ODM, HTN, and CHOL measures, respectively, compared with the average MA-PD plan contract differences (1.1, 2.1, and 2.5) and the comparator health plan differences (-2.7, -1.4, and -4.1). Increases in iCare's adherence rates were associated with significant increases in iCare's 2014 adherence measure star ratings (1 star to 3 stars for ODM and CHOL, 1 star to 2 stars for HTN), which contributed to increases in the Drug Plan Quality Improvement measure (2 stars to 4 stars) and iCare's overall Part D star rating (3 to 3.5 stars).  Members in this MA-PD plan dual-eligible population benefited from multiple points of contact to achieve increased adherence. Health plans can use network pharmacies, care management staff, and their pharmacy benefits managers to collaborate and implement interventions aimed to improve members' adherence to targeted maintenance medications and overall health plan quality performance and star ratings.

  2. Strategic planning for MyRA performance: A causal loop diagram approach

    NASA Astrophysics Data System (ADS)

    Abidin, Norhaslinda Zainal; Zaibidi, Nerda Zura; Karim, Khairah Nazurah

    2017-10-01

    The nexus of research and innovation in higher education are continually receiving worldwide priority attention. Hence, Malaysia has taken its move to enhance public universities as a center of excellence by introducing the status of Research University (RU). To inspire all universities towards becoming a research university, The Ministry of Higher Education (MoHE) had revised an assessment called Malaysian Research Assessment Instrument (MyRA) to evaluate the performance of existence RUs, and other potential higher education institutions. The available spreadsheet tool to access MyRA performance is inadequate to support strategic planning. Since, higher education management is a complex system, in which components and their interactions are ever changing over time, there is a need to for an efficient approach to investigate system behavior and devise research management policies for the benefit of the institution itself and the higher education system. In this paper, we proposed a system dynamics simulation model to evaluate the impact of policies for obtaining the highest performance in MyRA assessment. Causal loop diagram is developed to investigate the relationship of various elements in research management, their inter-relationship that link together and their evolution of behavior over time.

  3. Mississippi Curriculum Framework for Automotive Body Repair (Program CIP: 47.0603--Auto/Automotive Body Repairer). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for automotive body repair I and II. Presented first are a program…

  4. Mississippi Curriculum Framework for Small Engine Repair (Program CIP: 47.0606--Small Engine Mechanic and Repairer). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for small engine repair I and II. Presented first are a program description…

  5. Mississippi Curriculum Framework for Business and Computer Technology (Program CIP: 52.0408--Gen. Office/Clerical & Typing Service). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for secondary-level courses in business and computer technology I-II.…

  6. Mississippi Curriculum Framework for Marketing and Fashion Merchandising (Program CIP: 08.0705--General Retailing Operations). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for marketing I-II and fashion merchandising. Presented first are a program…

  7. Mississippi Curriculum Framework for Brick, Block, and Stonemasonry (Program CIP: 46.0101--Mason and Tile Setter). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for two secondary-level courses in brick, block, and stonemasonry: brick,…

  8. 43 CFR 11.30 - What does the authorized official do if an assessment is warranted?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... NATURAL RESOURCE DAMAGE ASSESSMENTS Assessment Plan Phase § 11.30 What does the authorized official do if... natural resource damages. (b) Purpose. The purpose of the Assessment Plan is to ensure that the assessment... activities performed by the agency or tribe in management of the natural resource. Activities undertaken as...

  9. 43 CFR 11.30 - What does the authorized official do if an assessment is warranted?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... NATURAL RESOURCE DAMAGE ASSESSMENTS Assessment Plan Phase § 11.30 What does the authorized official do if... natural resource damages. (b) Purpose. The purpose of the Assessment Plan is to ensure that the assessment... activities performed by the agency or tribe in management of the natural resource. Activities undertaken as...

  10. Mississippi Curriculum Framework for Diesel Equipment Repair & Service (Program CIP: 47.0605--Diesel Engine Mechanic & Repairer). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for diesel engine mechanics I and II. Presented first are a program…

  11. Mississippi Curriculum Framework for Forestry (Program CIP: 03.0401--Forest Harvesting and Production Technology). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for forestry I and II. Presented first are a program description and course…

  12. Mississippi Curriculum Framework for Family and Consumer Sciences and Related Technology (Enrichment) (CIP: 20.0101--Comprehensive Consumer & Homemkg. Ed.). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for family and consumer sciences and related technology (enrichment).…

  13. Trade-Offs, Biases, and Uncertainty in Project Planning and Execution: A Problem-Based Simulation Exercise

    ERIC Educational Resources Information Center

    Smith-Daniels, Dwight E.; Smith-Daniels, Vicki L.

    2008-01-01

    The ability to plan and execute projects is a fundamental skill required among managers and business school graduates. In the opening phase of a project, the project team makes decisions about the relative priority of project time, cost, and performance objectives, oftentimes without complete information about customer and stakeholder…

  14. Mississippi Curriculum Framework for Machine Tool Operation/Machine Shop (Program CIP: 48.0503--Machine Shop Assistant). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for machine tool operation/machine shop I and II. Presented first are a…

  15. U.S. Navy Energy Plan

    DTIC Science & Technology

    1977-01-01

    services . He is the integrated material manager for bulk petroleum products and performs contract administration overseas. The Chief of Naval Operations...technologies with other requirements ( health . safety, environmental protection, and economic regulation). Federal Energy Administration FEA was established in...Naval Oil Shale Reserve No. 3 (Colorado No. 2) ........... .. 5-4 5.3 Administration or the Reserves ........................... 5-4 5.4 Future Plans

  16. A review of US Army aircrew-aircraft integration research programs

    NASA Technical Reports Server (NTRS)

    Key, D. C.; Aiken, E. W.

    1984-01-01

    If the U.S. Army's desire to develop a one crew version of the Light Helicopter Family (LHX) helicopter is to be realized, both flightpath management and mission management will have to be performed by one crew. Flightpath management, the helicopter pilot, and the handling qualities of the helicopter were discussed. In addition, mission management, the helicopter pilot, and pilot control/display interface were considered. Aircrew-aircraft integration plans and programs were reviewed.

  17. The Impact of Time Management on Students’ Academic Achievement

    NASA Astrophysics Data System (ADS)

    Razali, S. N. A. M.; Rusiman, M. S.; Gan, W. S.; Arbin, N.

    2018-04-01

    Time management is very important and it may actually affect individual’s overall performance and achievements. Students nowadays always commented that they do not have enough time to complete all the tasks assigned to them. In addition, a university environment’s flexibility and freedom can derail students who have not mastered time management skills. Therefore, the aim of this study is to determine the relationship between the time management and academic achievement of the students. The factor analysis result showed three main factors associated with time management which can be classified as time planning, time attitudes and time wasting. The result also indicated that gender and races of students show no significant differences in time management behaviours. While year of study and faculty of students reveal the significant differences in the time management behaviours. Meanwhile, all the time management behaviours are significantly positively related to academic achievement of students although the relationship is weak. Time planning is the most significant correlated predictor.

  18. Work Package 5: Contingency Management. Mission Planning Requirements Document: Preliminary Version. Revision A

    NASA Technical Reports Server (NTRS)

    2005-01-01

    The purpose of this document is to identify the general flight/mission planning requirements for same-day file-and-fly access to the NAS for both civil and military High-Altitude Long Endurance (HALE) Unmanned Aircraft System (UAS). Currently the scope of this document is limited to Step 1, operations above flight level 43,000 feet (FL430). This document describes the current applicable mission planning requirements and procedures for both manned and unmanned aircraft and addresses HALE UAS flight planning considerations in the future National Airspace System (NAS). It also discusses the unique performance and operational capabilities of HALE UAS associated with the Access 5 Project, presents some of the projected performance characteristics and conceptual missions for future systems, and provides detailed analysis of the recommended mission planning elements for operating HALE UAS in the NAS.

  19. [Evaluation of women's health care programs in the main institutions of the Mexican health system].

    PubMed

    Enciso, Graciela Freyermuth; Navarro, Sergio Meneses; Martínez, Martín Romero

    2015-01-01

    The aim of this study was to analyze the institutional capacity for provision of women's health care services in Mexico in accordance with prevailing regulations. A probabilistic national sample of health care institutions was used to compare performance rates according to services packages based on analysis of variance. No package showed outstanding performance. Adequate performance was seen in referral and counter-referral centers for uterine cervical cancer, childbirth care, breast cancer diagnosis, family planning counseling, and training in sexual and reproductive health. The lowest performance was seen in the prevention of uterine cervical cancer, obstetric urgencies, family and sexual violence, and promotion of family planning. All the institutions showed low performance in the prevention of breast cancer, promotion of family planning, and management of family and gender violence. The Ministry of Health's leadership needs to be strengthened in order to overcome resistance for the institutions to adhere to the prevailing regulations.

  20. 78 FR 4859 - Notice of Proposed Information for Public Comment for: Energy and Performance Information Center

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-23

    ... requirement described below will be submitted to the Office of Management and Budget (OMB) for review, as...; other planning collections and performance reports presently collected in hard copy; the Physical Needs... tracking of the Energy Performance Contract process and will include the Physical Needs Assessment tool...

  1. System Support/Sustainment Plan Platform for the Defense Enterprise Accounting Management System (DEAMS)

    DTIC Science & Technology

    2006-12-01

    warfighters requirements and identifies system performance short-comings over its life cycle. 15. NUMBER OF PAGES 89 14. SUBJECT TERMS Information...the system performs to warfighters requirements and identifies system performance short-comings over its life cycle. vi...3 II. DEFENSE ACQUISITION LIFE CYCLE CURRENT STAGE ANALYSIS.......5 A. INTRODUCTION

  2. Decision space for health workforce management in decentralized settings: a case study in Uganda.

    PubMed

    Alonso-Garbayo, Alvaro; Raven, Joanna; Theobald, Sally; Ssengooba, Freddie; Nattimba, Milly; Martineau, Tim

    2017-11-01

    The aim of this paper is to improve understanding about how district health managers perceive and use their decision space for human resource management (HRM) and how this compares with national policies and regulatory frameworks governing HRM. The study builds upon work undertaken by PERFORM Research Consortium in Uganda using action-research to strengthen human resources management in the health sector. To assess the decision space that managers have in six areas of HRM (e.g. policy, planning, remuneration and incentives, performance management, education and information) the study compares the roles allocated by Uganda's policy and regulatory frameworks with the actual room for decision-making that district health managers perceive that they have. Results show that in some areas District Health Management Team (DHMT) members make decisions beyond their conferred authority while in others they do not use all the space allocated by policy. DHMT members operate close to the boundaries defined by public policy in planning, remuneration and incentives, policy and performance management. However, they make decisions beyond their conferred authority in the area of information and do not use all the space allocated by policy in the area of education. DHMTs' decision-making capacity to manage their workforce is influenced by their own perceived authority and sometimes it is constrained by decisions made at higher levels. We can conclude that decentralization, to improve workforce performance, needs to devolve power further down from district authorities onto district health managers. DHMTs need not only more power and authority to make decisions about their workforce but also more control over resources to be able to implement these decisions. © The Author 2017. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  3. Using a nursing balanced scorecard approach to measure and optimize nursing performance.

    PubMed

    Jeffs, Lianne; Merkley, Jane; Richardson, Sandy; Eli, Jackie; McAllister, Mary

    2011-04-01

    The authors give an overview of one healthcare organization's experience in developing a nursing strategic plan and nursing balanced scorecard (NBS) using a focused planning process involving strategy mapping. The NBS is being used at this organization to manage the nursing strategic plan by leveraging and improving nursing processes and organizational capabilities as required, based on data and transparent communication of performance results to key stakeholders. Key strategies and insights may help other nurse leaders in developing or refining strategic approaches to measuring nursing performance. Vital to the success of an organization's strategic plan are ongoing endorsement, engagement and visibility of senior leaders. Quality of decisions made depends on the organization's ability to collect data from multiple sources using standardized definitions, mine data and extract them for statistical analysis and effectively present them in a compelling and understandable way to users and decision-makers.

  4. Medication Management: The Macrocognitive Workflow of Older Adults With Heart Failure

    PubMed Central

    2016-01-01

    Background Older adults with chronic disease struggle to manage complex medication regimens. Health information technology has the potential to improve medication management, but only if it is based on a thorough understanding of the complexity of medication management workflow as it occurs in natural settings. Prior research reveals that patient work related to medication management is complex, cognitive, and collaborative. Macrocognitive processes are theorized as how people individually and collaboratively think in complex, adaptive, and messy nonlaboratory settings supported by artifacts. Objective The objective of this research was to describe and analyze the work of medication management by older adults with heart failure, using a macrocognitive workflow framework. Methods We interviewed and observed 61 older patients along with 30 informal caregivers about self-care practices including medication management. Descriptive qualitative content analysis methods were used to develop categories, subcategories, and themes about macrocognitive processes used in medication management workflow. Results We identified 5 high-level macrocognitive processes affecting medication management—sensemaking, planning, coordination, monitoring, and decision making—and 15 subprocesses. Data revealed workflow as occurring in a highly collaborative, fragile system of interacting people, artifacts, time, and space. Process breakdowns were common and patients had little support for macrocognitive workflow from current tools. Conclusions Macrocognitive processes affected medication management performance. Describing and analyzing this performance produced recommendations for technology supporting collaboration and sensemaking, decision making and problem detection, and planning and implementation. PMID:27733331

  5. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project: KDP-A for Phase 2 Minimum Operational Performance Standards

    NASA Technical Reports Server (NTRS)

    Grindle, Laurie; Hackenberg, Davis L.

    2016-01-01

    UAS Integration in the NAS Project has: a) Developed Technical Challenges that are crucial to UAS integration, aligned with NASA's Strategic Plan and Thrusts, and support FAA standards development. b) Demonstrated rigorous project management processes through the execution of previous phases. c) Defined Partnership Plans. d) Established path to KDP-C. Request approval of Technical Challenges, execution of partnerships and plans, and execution of near-term FY17 activities. There is an increasing need to fly UAS in the NAS to perform missions of vital importance to National Security and Defense, Emergency Management, and Science. There is also an emerging need to enable commercial applications such as cargo transport (e.g. FedEx). Unencumbered NAS Access for Civil/Commercial UAS. Provide research findings, utilizing simulation and flight tests, to support the development and validation of DAA and C2 technologies necessary for integrating Unmanned Aircraft Systems into the National Airspace System.

  6. Wind Lidar Edge Technique Shuttle Demonstration Mission: Anemos

    NASA Technical Reports Server (NTRS)

    Leete, Stephen J.; Bundas, David J.; Martino, Anthony J.; Carnahan, Timothy M.; Zukowski, Barbara J.

    1998-01-01

    A NASA mission is planned to demonstrate the technology for a wind lidar. This will implement the direct detection edge technique. The Anemos instrument will fly on the Space Transportation System (STS), or shuttle, aboard a Hitchhiker bridge. The instrument is being managed by the Goddard Space Flight Center as an in-house build, with science leadership from the GSFC Laboratory for Atmospheres, Mesoscale Atmospheric Processes Branch. During a roughly ten-day mission, the instrument will self calibrate and adjust for launch induced mis-alignments, and perform a campaign of measurements of tropospheric winds. The mission is planned for early 2001. The instrument is being developed under the auspices of NASA's New Millennium Program, in parallel with a comparable mission being managed by the Marshall Space Flight Center. That mission, called SPARCLE, will implement the coherent technique. NASA plans to fly the two missions together on the same shuttle flight, to allow synergy of wind measurements and a direct comparison of performance.

  7. Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)

    NASA Technical Reports Server (NTRS)

    Niewoehner, Kevin R.; Carter, John (Technical Monitor)

    2001-01-01

    The research accomplishments for the cooperative agreement 'Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)' include the following: (1) previous IFC program data collection and analysis; (2) IFC program support site (configured IFC systems support network, configured Tornado/VxWorks OS development system, made Configuration and Documentation Management Systems Internet accessible); (3) Airborne Research Test Systems (ARTS) II Hardware (developed hardware requirements specification, developing environmental testing requirements, hardware design, and hardware design development); (4) ARTS II software development laboratory unit (procurement of lab style hardware, configured lab style hardware, and designed interface module equivalent to ARTS II faceplate); (5) program support documentation (developed software development plan, configuration management plan, and software verification and validation plan); (6) LWR algorithm analysis (performed timing and profiling on algorithm); (7) pre-trained neural network analysis; (8) Dynamic Cell Structures (DCS) Neural Network Analysis (performing timing and profiling on algorithm); and (9) conducted technical interchange and quarterly meetings to define IFC research goals.

  8. 76 FR 34745 - Delegation of Authority to the Chief Operating Officer

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-14

    ... Information Act processing, budgeting, accounting, hiring and training employees, modernizing information... strategic planning, and performance management and measurement. Section B. Authority Excepted The authority...

  9. Immunizations and African Americans

    MedlinePlus

    ... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...

  10. Diabetes and Hispanic Americans

    MedlinePlus

    ... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...

  11. Cancer and African Americans

    MedlinePlus

    ... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...

  12. Hospital management contracts: institutional and community perspectives.

    PubMed Central

    Wheeler, J R; Zuckerman, H S

    1984-01-01

    Previous studies have shown that external management by contract can improve the performance of managed hospitals. This article presents a conceptual framework which develops specific hypotheses concerning improved hospital operating efficiency, increased ability to meet hospital objectives, and increased ability to meet community objectives. Next, changes in the process and structure of management under contractual arrangements, based on observations from two not-for-profit hospital systems, are described. Finally, the effects of these management changes over time on hospital and community objectives are presented. These effects suggest progressive stages in the development of management contracts. The first stage focuses on stabilizing hospital financial performance. Stage two involves recruitment and retention efforts to secure necessary personnel. In the third stage, attention shifts to strategic planning and marketing. PMID:6490378

  13. Medicare managed care plan performance: a comparison across hospitalization types.

    PubMed

    Basu, Jayasree; Mobley, Lee Rivers

    2012-01-01

    The study evaluates the performance of Medicare managed care (Medicare Advantage [MA]) Plans in comparison to Medicare fee-for-service (FFS) Plans in three states with historically high Medicare managed care penetration (New York, California, Florida), in terms of lowering the risks of preventable or ambulatory care sensitive conditions (ACSC) hospital admissions and providing increased referrals for admissions for specialty procedures. Using 2004 hospital discharge files from the Healthcare Cost and Utilization Project (HCUP-SID) of the Agency for Healthcare Research and Quality, ACSC admissions are compared with 'marker' admissions and 'referral-sensitive' admissions, using a multinomial logistic regression approach. The year 2004 represents a strategic time to test the impact of MA on preventable hospitalizations, because the HMOs dominated the market composition in that time period. MA enrollees in California experienced 22% lower relative risk (RRR= 0.78, p<0.01), those in Florida experienced 16% lower relative risk (RRR= 0.84, p<0.01), while those in New York experienced 9% lower relative risk (RRR=0.91, p<0.01) of preventable (versus marker) admissions compared to their FFS counterparts. MA enrollees in New York experienced 37% higher relative risk (RRR=1.37, p<0.01) and those in Florida had 41% higher relative risk (RRR=1.41, p<0.01)-while MA enrollees in California had 13% lower relative risk (RRR=0.87, p<0.01)-of referral-sensitive (versus marker) admissions compared to their FFS counterparts. While MA plans were associated with reductions in preventable hospitalizations in all three states, the effects on referral-sensitive admissions varied, with California experiencing lower relative risk of referral-sensitive admissions for MA plan enrollees. The lower relative risk of preventable admissions for MA plan enrollees in New York and Florida became more pronounced after accounting for selection bias.

  14. Disease management as a performance improvement strategy.

    PubMed

    McClatchey, S

    2001-11-01

    Disease management is a strategy of organizing care and services for a patient population across the continuum. It is characterized by a population database, interdisciplinary and interagency collaboration, and evidence-based clinical information. The effectiveness of a disease management program has been measured by a combination of clinical, financial, and quality of life outcomes. In early 1997, driven by a strategic planning process that established three Centers of Excellence (COE), we implemented disease management as the foundation for a new approach to performance improvement utilizing five key strategies. The five implementation strategies are outlined, in addition to a review of the key elements in outcome achievement.

  15. The role of disease management in pay-for-performance programs for improving the care of chronically ill patients.

    PubMed

    Beich, Jeff; Scanlon, Dennis P; Ulbrecht, Jan; Ford, Eric W; Ibrahim, Ibrahim A

    2006-02-01

    To date, pay-for-performance programs targeting the care of persons with chronic conditions have primarily been directed at physicians and provide an alternative to health plan-sponsored chronic disease management (DM) programs. Both approaches require similar infrastructure, and each has its own advantages and disadvantages for program implementation. Pay-for-performance programs use incentives based on patient outcomes; however, an alternative system might incorporate measures of structure and process. Using a conceptual framework, the authors explore the variation in 50 diabetes DM programs using data from the 2002 National Business Coalition on Health's eValue8 Request for Information (RFI). The authors raise issues relevant to the assignment of accountability for patient outcomes to either health plans or physicians. They analyze the association between RFI scores measuring structures and processes, and HEDIS diabetes intermediate outcome measures. Finally, the strengths and weaknesses of using the RFI scores as an alternative metric for pay-for-performance programs are discussed.

  16. Multi-community command and control systems in law enforcement: An introductory planning guide

    NASA Technical Reports Server (NTRS)

    Sohn, R. L.; Garcia, E. A.; Kennedy, R. D.

    1976-01-01

    A set of planning guidelines for multi-community command and control systems in law enforcement is presented. Essential characteristics and applications of these systems are outlined. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. Program management techniques and joint powers agreements for multicommunity programs are discussed in detail. A description of a typical multi-community computer-aided dispatch system is appended.

  17. 36 CFR 219.2 - Levels of planning and responsible officials.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... AGRICULTURE PLANNING National Forest System Land Management Planning § 219.2 Levels of planning and... management plan. A land management plan provides a framework for integrated resource management and for... management policies, practices, and procedures that are in the Forest Service Directive System. (3) The...

  18. Planning fuel-conservative descents with or without time constraints using a small programmable calculator: Algorithm development and flight test results

    NASA Technical Reports Server (NTRS)

    Knox, C. E.

    1983-01-01

    A simplified flight-management descent algorithm, programmed on a small programmable calculator, was developed and flight tested. It was designed to aid the pilot in planning and executing a fuel-conservative descent to arrive at a metering fix at a time designated by the air traffic control system. The algorithm may also be used for planning fuel-conservative descents when time is not a consideration. The descent path was calculated for a constant Mach/airspeed schedule from linear approximations of airplane performance with considerations given for gross weight, wind, and nonstandard temperature effects. The flight-management descent algorithm is described. The results of flight tests flown with a T-39A (Sabreliner) airplane are presented.

  19. Pre-implementation studies of a workforce planning tool for nurse staffing and human resource management in university hospitals.

    PubMed

    van Oostveen, Catharina J; Ubbink, Dirk T; Mens, Marian A; Pompe, Edwin A; Vermeulen, Hester

    2016-03-01

    To investigate the reliability, validity and feasibility of the RAFAELA workforce planning system (including the Oulu patient classification system - OPCq), before deciding on implementation in Dutch hospitals. The complexity of care, budgetary restraints and demand for high-quality patient care have ignited the need for transparent hospital workforce planning. Nurses from 12 wards of two university hospitals were trained to test the reliability of the OPCq by investigating the absolute agreement of nursing care intensity (NCI) measurements among nurses. Validity was tested by assessing whether optimal NCI/nurse ratio, as calculated by a regression analysis in RAFAELA, was realistic. System feasibility was investigated through a questionnaire among all nurses involved. Almost 67 000 NCI measurements were performed between December 2013 and June 2014. Agreement using the OPCq varied between 38% and 91%. For only 1 in 12 wards was the optimal NCI area calculated judged as valid. Although the majority of respondents was positive about the applicability and user-friendliness, RAFAELA was not accepted as useful workforce planning system. Nurses' performance using the RAFAELA system did not warrant its implementation. Hospital managers should first focus on enlarging the readiness of nurses regarding the implementation of a workforce planning system. © 2015 John Wiley & Sons Ltd.

  20. 15 CFR 291.3 - Environmental tools and techniques projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... activity, and “customer satisfaction” measures of performance. (6) Management experience and plans... population must be clearly defined. The proposal must demonstrate that it understands the population's...

  1. Medicaid.gov

    MedlinePlus

    ... Monitoring Review Plans Program Integrity National Correct Coding Initiative Affordable Care Act Program Integrity Provisions Cost Sharing ... to Care Living Well Quality of Care Improvement Initiatives Medicaid Managed Care Performance Measurement Releases & Announcements Enrollment ...

  2. Medicaid Benefits

    MedlinePlus

    ... Monitoring Review Plans Program Integrity National Correct Coding Initiative Affordable Care Act Program Integrity Provisions Cost Sharing ... to Care Living Well Quality of Care Improvement Initiatives Medicaid Managed Care Performance Measurement Releases & Announcements Enrollment ...

  3. Infant Mortality and Hispanic Americans

    MedlinePlus

    ... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...

  4. Heart Disease and African Americans

    MedlinePlus

    ... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...

  5. Cancer and Asians/Pacific Islanders

    MedlinePlus

    ... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...

  6. Infant Mortality and African Americans

    MedlinePlus

    ... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...

  7. The development of a Flight Test Engineer's Workstation for the Automated Flight Test Management System

    NASA Technical Reports Server (NTRS)

    Tartt, David M.; Hewett, Marle D.; Duke, Eugene L.; Cooper, James A.; Brumbaugh, Randal W.

    1989-01-01

    The Automated Flight Test Management System (ATMS) is being developed as part of the NASA Aircraft Automation Program. This program focuses on the application of interdisciplinary state-of-the-art technology in artificial intelligence, control theory, and systems methodology to problems of operating and flight testing high-performance aircraft. The development of a Flight Test Engineer's Workstation (FTEWS) is presented, with a detailed description of the system, technical details, and future planned developments. The goal of the FTEWS is to provide flight test engineers and project officers with an automated computer environment for planning, scheduling, and performing flight test programs. The FTEWS system is an outgrowth of the development of ATMS and is an implementation of a component of ATMS on SUN workstations.

  8. 76 FR 38672 - Order of Succession for the Office of Strategic Planning and Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-01

    ... Office of Strategic Planning and Management AGENCY: Office of Strategic Planning and Management, HUD... Planning and Management, designates the Order of Succession for the Office of Strategic Planning and..., 2011. FOR FURTHER INFORMATION CONTACT: Nina M. Coward, Office of Strategic Planning and Management...

  9. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Water quality management plans. 130.6... QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM... and certified and approved updates to those plans. Continuing water quality planning shall be based...

  10. A Review of Literature on Teacher Efficacy and Classroom Management

    ERIC Educational Resources Information Center

    Dibapile, Waitshega Tefo Smitta

    2012-01-01

    The purpose of this paper was to review the literature on teacher efficacy and classroom management. The conceptual framework of this paper was based on the theories of Rotter (1966) and Bandura (1977). The review of literature indicated that teacher efficacy helps teachers plan effective instructional strategies, increases performance, and…

  11. Financial planning on a comprehensive scale.

    PubMed

    Mishra, Simita

    2013-04-01

    Hospitals and health systems that wish to explore the shift to comprehensive care management should: Assess the investments in infrastructure necessary to support comprehensive care management, Gauge the financial implications and set quality and financial goals, Monitor performance using metrics such as patient satisfaction, avoidable admissions, out-of-group referrals, and average length of stay.

  12. School-Based Management and Accountability Procedures Manual

    ERIC Educational Resources Information Center

    North Carolina Department of Public Instruction, 2004

    2004-01-01

    From the mission, several principles were developed to guide the School-Based Management and Accountability Program (the ABCs). (1) The ABCs sets standards for student performance and growth in the basics that are the foundation for further learning and achievement; (2) The accountability system in the ABCs plan is designed to result in improved…

  13. Selecting Statistical Procedures for Quality Control Planning Based on Risk Management.

    PubMed

    Yago, Martín; Alcover, Silvia

    2016-07-01

    According to the traditional approach to statistical QC planning, the performance of QC procedures is assessed in terms of its probability of rejecting an analytical run that contains critical size errors (PEDC). Recently, the maximum expected increase in the number of unacceptable patient results reported during the presence of an undetected out-of-control error condition [Max E(NUF)], has been proposed as an alternative QC performance measure because it is more related to the current introduction of risk management concepts for QC planning in the clinical laboratory. We used a statistical model to investigate the relationship between PEDC and Max E(NUF) for simple QC procedures widely used in clinical laboratories and to construct charts relating Max E(NUF) with the capability of the analytical process that allow for QC planning based on the risk of harm to a patient due to the report of erroneous results. A QC procedure shows nearly the same Max E(NUF) value when used for controlling analytical processes with the same capability, and there is a close relationship between PEDC and Max E(NUF) for simple QC procedures; therefore, the value of PEDC can be estimated from the value of Max E(NUF) and vice versa. QC procedures selected by their high PEDC value are also characterized by a low value for Max E(NUF). The PEDC value can be used for estimating the probability of patient harm, allowing for the selection of appropriate QC procedures in QC planning based on risk management. © 2016 American Association for Clinical Chemistry.

  14. Strategic planning processes and financial performance among hospitals in Lebanon.

    PubMed

    Saleh, Shadi; Kaissi, Amer; Semaan, Adele; Natafgi, Nabil Maher

    2013-01-01

    Strategic planning has been presented as a valuable management tool. However, evidence of its deployment in healthcare and its effect on organizational performance is limited in low-income and middle-income countries (LMICs). The study aimed to explore the use of strategic planning processes in Lebanese hospitals and to investigate its association with financial performance. The study comprised 79 hospitals and assessed occupancy rate (OR) and revenue-per-bed (RPB) as performance measures. The strategic planning process included six domains: having a plan, plan development, plan implementation, responsibility of planning activities, governing board involvement, and physicians' involvement. Approximately 90% of hospitals have strategic plans that are moderately developed (mean score of 4.9 on a 1-7 scale) and implemented (score of 4.8). In 46% of the hospitals, the CEO has the responsibility for the plan. The level of governing board involvement in the process is moderate to high (score of 5.1), whereas physician involvement is lower (score of 4.1). The OR and RPB amounted to respectively 70% and 59 304 among hospitals with a strategic plan as compared with 62% and 33 564 for those lacking such a plan. No statistical association between having a strategic plan and either of the two measures was detected. However, the findings revealed that among hospitals that had a strategic plan, higher implementation levels were associated with lower OR (p < 0.05). In an LMIC healthcare environment characterized by resource limitation, complexity, and political and economic volatility, flexibility rather than rigid plans allow organizations to better cope with environmental turbulence. Copyright © 2012 John Wiley & Sons, Ltd.

  15. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  16. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  17. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  18. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  19. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  20. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  1. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  2. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  3. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  4. DMPTool: New Guidance, Resources, and Outreach for Quality Data Management Plans

    NASA Astrophysics Data System (ADS)

    Cruse, P.; Sallans, A.

    2013-12-01

    A growing number of US federal funding agencies require data management plans (DMP) as part of new research grant proposals. To help researchers with this requirement, several organizations (the California Digital Library, University of Illinois, University of Virginia, Smithsonian Institution, the DataONE consortium and the (UK) Digital Curation Centre) came together to develop the DMPTool in 2011. The goal of the DMPTool is to provide researchers with guidance, links to resources and help with writing data management plans. Thanks to a grant from the Alfred P. Sloan Foundation, these organizations have been able to develop DMPTool2, adding new features and functionality, while aiming to grow the number of users and funding requirements and build a community around DMP best practices. Researchers create plans in the tool by selecting their desired funding agency. The tool provides specific requirements from the selected agency as well as detailed help with each area of the plan. Users have access to complete DMP life cycle management, tracking changes through creation, editing, submission, evaluation, and publication. They may also perform enhanced keyword searches and view publicly available plans. With role-based user authorization, users may hold various roles within the interface: creators, collaborators, institutional administrators, and tool administrators. Furthermore, partner institutions can add significant value to the process with several special tool features. Along with institutional branding in the interface, they can provide links to resources they provide to users, such as to preservation repositories, consultation services, or news and event items. In addition, partner institutions can provide help with specific plan questions, and even suggest responses. Institutional administrators can also mine data on plans in order to better support researchers. Institutions may be represented in different roles: as a funder, a researcher's affiliate, or as an institution with its own DMP requirements.

  5. Medical records department and balanced scorecard approach.

    PubMed

    Ajami, Sima; Ebadsichani, Afsaneh; Tofighi, Shahram; Tavakoli, Nahid

    2013-01-01

    The Medical Records Department (MRD) is an important source for evaluating and planning of healthcare services; therefore, hospital managers should improve their performance not only in the short-term but also in the long-term plans. The Balanced Scorecard (BSC) is a tool in the management system that enables organizations to correct operational functions and provides feedback around both the internal processes and the external outcomes, in order to improve strategic performance and outcomes continuously. The main goal of this study was to assess the MRD performance with BSC approach in a hospital. This research was an analytical cross-sectional study in which data was collected by questionnaires, forms and observation. The population was the staff of the MRD in a hospital in Najafabad, Isfahan, Iran. To analyze data, first, objectives of the MRD, according to the mission and perspectives of the hospital, were redefined and, second, indicators were measured. Subsequently, findings from the performance were compared with the expected score. In order to achieve the final target, the programs, activities, and plans were reformed. The MRD was successful in absorbing customer satisfaction. From a customer perspective, score in customer satisfaction of admission and statistics sections were 82% and 83%, respectively. The comprehensive nature of the strategy map makes the MRD especially useful as a consensus building and communication tool in the hospital.

  6. 40 CFR 60.2035 - How are these new source performance standards structured?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... standards structured? 60.2035 Section 60.2035 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... source performance standards contain the eleven major components listed in paragraphs (a) through (k) of this section. (a) Preconstruction siting analysis. (b) Waste management plan. (c) Operator training and...

  7. Energy Supplement. Supplement to School Planning and Management.

    ERIC Educational Resources Information Center

    Schoff, Larry

    2001-01-01

    Presents the following articles on energy efficiency and American public schools: "High Performance Schools Reduce Costs and Improve Student and Staff Environment" (Larry Schoff); "ASHRAE's Standard 90.1: Educating the Engineer" (Mack and Melanie Wallace"; and "Performance Contracting: Meeting the Challenge of Deferred Maintenance in America's…

  8. High-Performance Computing in Neuroscience for Data-Driven Discovery, Integration, and Dissemination

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bouchard, Kristofer E.; Aimone, James B.; Chun, Miyoung

    A lack of coherent plans to analyze, manage, and understand data threatens the various opportunities offered by new neuro-technologies. High-performance computing will allow exploratory analysis of massive datasets stored in standardized formats, hosted in open repositories, and integrated with simulations.

  9. High-Performance Computing in Neuroscience for Data-Driven Discovery, Integration, and Dissemination

    DOE PAGES

    Bouchard, Kristofer E.; Aimone, James B.; Chun, Miyoung; ...

    2016-11-01

    A lack of coherent plans to analyze, manage, and understand data threatens the various opportunities offered by new neuro-technologies. High-performance computing will allow exploratory analysis of massive datasets stored in standardized formats, hosted in open repositories, and integrated with simulations.

  10. Diabetes and Asians and Pacific Islanders

    MedlinePlus

    ... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...

  11. Diabetes and Native Hawaiians/Pacific Islanders

    MedlinePlus

    ... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...

  12. Asthma and Native Hawaiians/Pacific Islanders

    MedlinePlus

    ... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...

  13. Stroke and Native Hawaiians/Pacific Islanders

    MedlinePlus

    ... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...

  14. Asthma and American Indians/Alaska Natives

    MedlinePlus

    ... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...

  15. Chronic Liver Disease and Hispanic Americans

    MedlinePlus

    ... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...

  16. Chronic Liver Disease and African Americans

    MedlinePlus

    ... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...

  17. Immunizations and Asians and Pacific Islanders

    MedlinePlus

    ... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...

  18. 40 CFR 60.2899 - What is a waste management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60.2899 Section 60.2899 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...

  19. 40 CFR 60.2620 - What is a waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What is a waste management plan? 60... Commercial and Industrial Solid Waste Incineration Units Model Rule-Waste Management Plan § 60.2620 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility...

  20. An assessment of PERT as a technique for schedule planning and control

    NASA Technical Reports Server (NTRS)

    Sibbers, C. W.

    1982-01-01

    The PERT technique including the types of reports which can be computer generated using the NASA/LaRC PPARS System is described. An assessment is made of the effectiveness of PERT on various types of efforts as well as for specific purposes, namely, schedule planning, schedule analysis, schedule control, monitoring contractor schedule performance, and management reporting. This assessment is based primarily on the author's knowledge of the usage of PERT by NASA/LaRC personnel since the early 1960's. Both strengths and weaknesses of the technique for various applications are discussed. It is intended to serve as a reference guide for personnel performing project planning and control functions and technical personnel whose responsibilities either include schedule planning and control or require a general knowledge of the subject.

  1. Mississippi Curriculum Framework for Vehicle and Mobile Equipment Mechanics (Program CIP: 47.0699--Vehicle and Mobile Equipment Mech.). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for vehicle and mobile equipment mechanics I and II. Presented first are a…

  2. ICESat (GLAS) Science Processing Software Document Series. Volume 1; Science Software Management Plan; 3.0

    NASA Technical Reports Server (NTRS)

    Hancock, David W., III

    1999-01-01

    This document provides the Software Management Plan for the GLAS Standard Data Software (SDS) supporting the GLAS instrument of the EOS ICESat Spacecraft. The SDS encompasses the ICESat Science Investigator-led Processing System (I-SIPS) Software and the Instrument Support Terminal (IST) Software. For the I-SIPS Software, the SDS will produce Level 0, Level 1, and Level 2 data products as well as the associated product quality assessments and descriptive information. For the IST Software, the SDS will accommodate the GLAS instrument support areas of engineering status, command, performance assessment, and instrument health status.

  3. Using the Integrated Vehicle Health Management Research Test and Integration Plan Wiki to Identify Synergistic Test Opportunities

    NASA Technical Reports Server (NTRS)

    Koelfgen, Syri J.; Faber, James J.

    2010-01-01

    The National Aeronautics and Space Administration (NASA) and the aviation industry have recognized a need for developing a method to identify and combine resources to carry out research and testing more efficiently. The Integrated Vehicle Health Management (IVHM) Research Test and Integration Plan (RTIP) Wiki is a tool that is used to visualize, plan, and accomplish collaborative research and testing. Synergistic test opportunities are developed using the RTIP Wiki, and include potential common resource testing that combines assets and personnel from NASA, industry, academia, and other government agencies. A research scenario is linked to the appropriate IVHM milestones and resources detailed in the wiki, reviewed by the research team members, and integrated into a collaborative test strategy. The scenario is then implemented by creating a test plan when appropriate and the research is performed. The benefits of performing collaborative research and testing are achieving higher Technology Readiness Level (TRL) test opportunities with little or no additional cost, improved quality of research, and increased communication among researchers. In addition to a description of the method of creating these joint research scenarios, examples of the successful development and implementation of cooperative research using the IVHM RTIP Wiki are given.

  4. Optimism in Enrollment Management

    ERIC Educational Resources Information Center

    Buster-Williams, Kimberley

    2016-01-01

    Enrollment managers, like most managers, have goals that must be focused on with precision, excitement, and vigor. Enrollment managers must excel at enrollment planning. Typically, enrollment planning unites undergraduate and graduate recruitment plans, out-of-state recruitment plans, marketing plans, retention plans, international enrollment…

  5. Nonstructural urban stormwater quality measures: building a knowledge base to improve their use.

    PubMed

    Taylor, André C; Fletcher, Tim D

    2007-05-01

    This article summarizes a research project that investigated the use, performance, cost, and evaluation of nonstructural measures to improve urban stormwater quality. A survey of urban stormwater managers from Australia, New Zealand, and the United States revealed a widespread trend of increasing use of nonstructural measures among leading stormwater management agencies, with at least 76% of 41 types of nonstructural measures being found to be increasing in use. Data gathered from the survey, an international literature review, and a multicriteria analysis highlighted four nonstructural measures of greatest potential value: mandatory town planning controls that promote the adoption of low-impact development principles and techniques; development of strategic urban stormwater management plans for a city, shire, or catchment; stormwater management measures and programs for construction/building sites; and stormwater management activities related to municipal maintenance operations such as maintenance of the stormwater drainage network and manual litter collections. Knowledge gained on the use and performance of nonstructural measures from the survey, literature review, and three trial evaluation projects was used to develop tailored monitoring and evaluation guidelines for these types of measure. These guidelines incorporate a new evaluation framework based on seven alternative styles of evaluation that range from simply monitoring whether a nonstructural measure has been fully implemented to monitoring its impact on waterway health. This research helps to build the stormwater management industry's knowledge base concerning nonstructural measures and provides a practical tool to address common impediments associated with monitoring and evaluating the performance and cost of these measures.

  6. Emergency information management needs and practices of older adults: A descriptive study.

    PubMed

    Turner, Anne M; Osterhage, Katie; Loughran, Julie; Painter, Ian; Demiris, George; Hartzler, Andrea L; Phelan, Elizabeth A

    2018-03-01

    To better understand how older adults currently manage emergency information, the barriers and facilitators to planning and management of emergency information, as well as the potential role of information technology to facilitate emergency planning and management. Older adults face a much higher risk of sudden illness/injury and are the age group with the largest percentages of emergent and urgent healthcare visits. Emergency information (health information needed in an emergency situation such as emergency contact information, diagnoses, and advance directives) needs to be maintained and easily accessible to ensure older adults get appropriate care and treatment consistent with their wishes in emergency situations. Current health information technologies rarely take into consideration the emergency information needs of older adults, their caregivers, and emergency responders. As part of a larger study we performed in-depth interviews with 90 older adults living in a variety of residential settings (independent living, retirement communities, assisted living) regarding how they manage information about their health. Interview sessions included photos of important health information artifacts. Interviews were transcribed and coded. Analysis of in-depth interviews revealed that emergency information is a type of health information that older adults frequently manage. Participants differed in whether they practice emergency planning (e.g. the preparation and continued management of emergency information), and in whether they involve others in emergency information and emergency planning. Despite its importance, emergency information was often not up-to-date and not always kept in locations readily apparent to emergency responders. Emergency information, such as emergency contact information, diagnoses, and advance directives, is a type of health information that older adults manage. Considering emergency information in the design of health information technologies for older adults could address some of the barriers and support the facilitators to emergency planning and information management. Copyright © 2017 Elsevier B.V. All rights reserved.

  7. Microworlds of the dynamic balanced scorecard for university (DBSC-UNI)

    NASA Astrophysics Data System (ADS)

    Hawari, Nurul Nazihah; Tahar, Razman Mat

    2015-12-01

    This research focuses on the development of a Microworlds of the dynamic balanced scorecard for university in order to enhance the university strategic planning process. To develop the model, we integrated both the balanced scorecard method and the system dynamics modelling method. Contrasting the traditional university planning tools, the developed model addresses university management problems holistically and dynamically. It is found that using system dynamics modelling method, the cause-and-effect relationships among variables related to the four conventional balanced scorecard perspectives are better understand. The dynamic processes that give rise to performance differences between targeted and actual performances also could be better understood. So, it is expected that the quality of the decisions taken are improved because of being better informed. The developed Microworlds can be exploited by university management to design policies that can positively influence the future in the direction of desired goals, and will have minimal side effects. This paper integrates balanced scorecard and system dynamics modelling methods in analyzing university performance. Therefore, this paper demonstrates the effectiveness and strength of system dynamics modelling method in solving problem in strategic planning area particularly in higher education sector.

  8. Business planning: can the health service move from strategy into action?

    PubMed

    Bennett, A R

    1994-01-01

    Advances the case for the use of one particular business planning technique within a National Health Service Trust. At the present time, NHS trusts are required to write strategic direction statements. Evidence suggests that these documents provide an accurate account of past performance and present position of the trust, but do not express the future position intended to be achieved. These documents also tend to be lengthy and lack strategic focus, which means that they are not helpful to managers who want clear organizational goals and objectives to which to work. Attempts to address the difficulties associated with determining how existing skills and resources can be used as the platform for future growth strategies by using the Ansoff Matrix and SWOT Analysis planning tools, given the external changes in the marketplace. Also attempts to shed light on some of the important links between busines strategy and management development by extending planning theory into practice.

  9. A Curriculum Guide for Energy Education - Vocational Home Economics Education. A Guide for Planning Performance-Based Energy Education in Home Economics Education Programs.

    ERIC Educational Resources Information Center

    South Carolina State Dept. of Education, Columbia. Home Economics Education Section.

    This guide serves as a resource for performance-based learning experiences designed to assist secondary school home economics students in developing competencies essential for effective energy use and management. A rationale for performance-based vocational education; definitions/explanations of the terms…

  10. The dynamic model of enterprise revenue management

    NASA Astrophysics Data System (ADS)

    Mitsel, A. A.; Kataev, M. Yu; Kozlov, S. V.; Korepanov, K. V.

    2017-01-01

    The article presents the dynamic model of enterprise revenue management. This model is based on the quadratic criterion and linear control law. The model is founded on multiple regression that links revenues with the financial performance of the enterprise. As a result, optimal management is obtained so as to provide the given enterprise revenue, namely, the values of financial indicators that ensure the planned profit of the organization are acquired.

  11. [Transferring palliative-care patients from hospital to community care: A qualitative study].

    PubMed

    Correa-Casado, Matías; Granero-Molina, José; Hernández-Padilla, José Manuel; Fernández-Sola, Cayetano

    To know the experience of case-manager nurses with regard to transferring palliative-care patients from the hospital to their homes. Qualitative phenomenological study carried out in 2014-2015. Poniente and Almería health districts, which referral hospitals are Poniente Hospital and Torrecárdenas Hospital, respectively. A purposive sample comprised of 12 case-manager nurses was recruited from the aforementioned setting. Theoretical data saturation was achieved after performing 7 in-depth individual interviews and 1 focus group. Data analysis was performed following Colaizzi's method. Three themes emerged: (1) 'Case-management nursing as a quality, patient-centred service' (2) 'Failures of the information systems', with the subthemes "patients" insufficient and inadequate previous information" and "ineffective between-levels communication channels for advanced nursing"; (3) 'Deficiencies in discharge planning', with the subthemes "deficient management of resources on admission", "uncertainty about discharge" and "insufficient human resources to coordinate the transfer". Case-manager nurses consider themselves a good-quality service. However, they think there are issues with coordination, information and discharge planning of palliative patients from hospital. It would be useful to review the communication pathways of both care and discharge reports, so that resources needed by palliative patients are effectively managed at the point of being transferred home. Copyright © 2016 Elsevier España, S.L.U. All rights reserved.

  12. Integrating operation design into infrastructure planning to foster robustness of planned water systems

    NASA Astrophysics Data System (ADS)

    Bertoni, Federica; Giuliani, Matteo; Castelletti, Andrea

    2017-04-01

    Over the past years, many studies have looked at the planning and management of water infrastructure systems as two separate problems, where the dynamic component (i.e., operations) is considered only after the static problem (i.e., planning) has been resolved. Most recent works have started to investigate planning and management as two strictly interconnected faces of the same problem, where the former is solved jointly with the latter in an integrated framework. This brings advantages to multi-purpose water reservoir systems, where several optimal operating strategies exist and similar system designs might perform differently on the long term depending on the considered short-term operating tradeoff. An operationally robust design will be therefore one performing well across multiple feasible tradeoff operating policies. This work aims at studying the interaction between short-term operating strategies and their impacts on long-term structural decisions, when long-lived infrastructures with complex ecological impacts and multi-sectoral demands to satisfy (i.e., reservoirs) are considered. A parametric reinforcement learning approach is adopted for nesting optimization and control yielding to both optimal reservoir design and optimal operational policies for water reservoir systems. The method is demonstrated on a synthetic reservoir that must be designed and operated for ensuring reliable water supply to downstream users. At first, the optimal design capacity derived is compared with the 'no-fail storage' computed through Rippl, a capacity design function that returns the minimum storage needed to satisfy specified water demands without allowing supply shortfall. Then, the optimal reservoir volume is used to simulate the simplified case study under other operating objectives than water supply, in order to assess whether and how the system performance changes. The more robust the infrastructural design, the smaller the difference between the performances of different operating strategies.

  13. 40 CFR 60.2755 - When must I submit my waste management plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emissions Guidelines and Compliance Times for Commercial and Industrial Solid Waste Incineration Units Model Rule-Recordkeeping and...

  14. 40 CFR 60.2755 - When must I submit my waste management plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emissions Guidelines and Compliance Times for Commercial and Industrial Solid Waste Incineration Units Model Rule-Recordkeeping and...

  15. Infant Mortality and Asians and Pacific Islanders

    MedlinePlus

    ... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...

  16. Infant Mortality and Native Hawaiians/Pacific Islanders

    MedlinePlus

    ... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...

  17. Infant Mortality and American Indians/Alaska Natives

    MedlinePlus

    ... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...

  18. Heart Disease and Asians and Pacific Islanders

    MedlinePlus

    ... Minority Health at HHS Advisory Committee Committees and Working Groups News HHS Disparities Action Plan National Partnership for Action Campaigns and Initiatives Performance Improvement and Management System Report to Congress Knowledge ...

  19. Modeling left turn queue lengths.

    DOT National Transportation Integrated Search

    2011-01-01

    This guidebook provides methodologies and procedures for using incident data collected at Texas transportation management centers (TMCs) to perform two types of analysis - evaluation/planning analysis and predictive analysis. For the evaluation/plann...

  20. 40 CFR 60.2055 - What is a waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What is a waste management plan? 60... Which Modification or Reconstruction Is Commenced on or After June 1, 2001 Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both...

Top