Sample records for performance monitoring program

  1. Development of GUI Type On-Line Condition Monitoring Program for a Turboprop Engine Using Labview

    NASA Astrophysics Data System (ADS)

    Kong, Changduk; Kim, Keonwoo

    2011-12-01

    Recently, an aero gas turbine health monitoring system has been developed for precaution and maintenance action against faults or performance degradations of the advanced propulsion system which occurs in severe environments such as high altitude, foreign object damage particles, hot and heavy rain and snowy atmospheric conditions. However to establish this health monitoring system, the online condition monitoring program is firstly required, and the program must monitor the engine performance trend through comparison between measured engine performance data and base performance results calculated by base engine performance model. This work aims to develop a GUI type on-line condition monitoring program for the PT6A-67 turboprop engine of a high altitude and long endurance operation UAV using LabVIEW. The base engine performance of the on-line condition monitoring program is simulated using component maps inversely generated from the limited performance deck data provided by engine manufacturer. The base engine performance simulation program is evaluated because analysis results by this program agree well with the performance deck data. The proposed on-line condition program can monitor the real engine performance as well as the trend through precise comparison between clean engine performance results calculated by the base performance simulation program and measured engine performance signals. In the development phase of this monitoring system, a signal generation module is proposed to evaluate the proposed online monitoring system. For user friendly purpose, all monitoring program are coded by LabVIEW, and monitoring examples are demonstrated using the proposed GUI type on-condition monitoring program.

  2. 25 CFR 276.9 - Monitoring and reporting program performances.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... frequency with which the performance reports will be submitted with the Request for Advance or Reimbursement... 25 Indians 1 2010-04-01 2010-04-01 false Monitoring and reporting program performances. 276.9... reporting program performances. (a) Grantees shall constantly monitor the performance under grant-supported...

  3. 20 CFR 437.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Monitoring and reporting program performance. 437.40 Section 437.40 Employees' Benefits SOCIAL SECURITY ADMINISTRATION UNIFORM ADMINISTRATIVE... Reports, Records, Retention, and Enforcement § 437.40 Monitoring and reporting program performance. (a...

  4. 45 CFR 2543.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 2543.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor subawards to...

  5. 15 CFR 14.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...-PROFIT, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Reports and Records § 14.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor subawards to...

  6. 14 CFR 1260.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...

  7. 14 CFR 1260.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...

  8. 15 CFR 14.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...-PROFIT, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Reports and Records § 14.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor subawards to...

  9. 45 CFR 2543.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 2543.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor subawards to...

  10. 14 CFR 1260.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...

  11. 45 CFR 2543.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 2543.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor subawards to...

  12. 45 CFR 2543.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Property Standards § 2543.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor subawards to...

  13. 15 CFR 14.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...-PROFIT, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Reports and Records § 14.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor subawards to...

  14. 15 CFR 14.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...-PROFIT, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Reports and Records § 14.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor subawards to...

  15. 28 CFR 70.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., HOSPITALS AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 70.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients must monitor subawards...

  16. 29 CFR 95.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-Award Requirements Reports and Records § 95.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor subawards to ensure subrecipients have met the audit...

  17. 29 CFR 95.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-Award Requirements Reports and Records § 95.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor subawards to ensure subrecipients have met the audit...

  18. 29 CFR 95.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-Award Requirements Reports and Records § 95.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor subawards to ensure subrecipients have met the audit...

  19. 22 CFR 226.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Reports and Records § 226.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor...

  20. 22 CFR 226.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Reports and Records § 226.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor...

  1. 29 CFR 95.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-Award Requirements Reports and Records § 95.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor subawards to ensure subrecipients have met the audit...

  2. 22 CFR 226.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Reports and Records § 226.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor...

  3. 28 CFR 70.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., HOSPITALS AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 70.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients must monitor subawards...

  4. 28 CFR 70.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., HOSPITALS AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 70.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients must monitor subawards...

  5. 28 CFR 70.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., HOSPITALS AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 70.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients must monitor subawards...

  6. 14 CFR § 1260.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...

  7. 22 CFR 226.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Reports and Records § 226.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award. Recipients shall monitor...

  8. 10 CFR 600.341 - Monitoring and reporting program and financial performance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Monitoring and reporting program and financial performance. 600.341 Section 600.341 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS FINANCIAL... Organizations Post-Award Requirements § 600.341 Monitoring and reporting program and financial performance. (a...

  9. 40 CFR 30.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 30.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award...

  10. 40 CFR 30.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 30.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award...

  11. 40 CFR 30.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 30.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award...

  12. 40 CFR 30.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 30.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award...

  13. 22 CFR 145.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 145.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award...

  14. 22 CFR 145.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 145.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award...

  15. 22 CFR 145.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 145.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award...

  16. 22 CFR 145.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 145.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award...

  17. 36 CFR 1210.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 1210.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award...

  18. 36 CFR 1210.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 1210.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award...

  19. 36 CFR 1210.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 1210.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subaward, function or activity supported by the award...

  20. Seven Q-Tracks monitors of laboratory quality drive general performance improvement: experience from the College of American Pathologists Q-Tracks program 1999-2011.

    PubMed

    Meier, Frederick A; Souers, Rhona J; Howanitz, Peter J; Tworek, Joseph A; Perrotta, Peter L; Nakhleh, Raouf E; Karcher, Donald S; Bashleben, Christine; Darcy, Teresa P; Schifman, Ron B; Jones, Bruce A

    2015-06-01

    Many production systems employ standardized statistical monitors that measure defect rates and cycle times, as indices of performance quality. Clinical laboratory testing, a system that produces test results, is amenable to such monitoring. To demonstrate patterns in clinical laboratory testing defect rates and cycle time using 7 College of American Pathologists Q-Tracks program monitors. Subscribers measured monthly rates of outpatient order-entry errors, identification band defects, and specimen rejections; median troponin order-to-report cycle times and rates of STAT test receipt-to-report turnaround time outliers; and critical values reporting event defects, and corrected reports. From these submissions Q-Tracks program staff produced quarterly and annual reports. These charted each subscriber's performance relative to other participating laboratories and aggregate and subgroup performance over time, dividing participants into best and median performers and performers with the most room to improve. Each monitor's patterns of change present percentile distributions of subscribers' performance in relation to monitoring durations and numbers of participating subscribers. Changes over time in defect frequencies and the cycle duration quantify effects on performance of monitor participation. All monitors showed significant decreases in defect rates as the 7 monitors ran variously for 6, 6, 7, 11, 12, 13, and 13 years. The most striking decreases occurred among performers who initially had the most room to improve and among subscribers who participated the longest. All 7 monitors registered significant improvement. Participation effects improved between 0.85% and 5.1% per quarter of participation. Using statistical quality measures, collecting data monthly, and receiving reports quarterly and yearly, subscribers to a comparative monitoring program documented significant decreases in defect rates and shortening of a cycle time for 6 to 13 years in all 7 ongoing clinical laboratory quality monitors.

  1. 28 CFR 66.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... performance. 66.40 Section 66.40 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) UNIFORM... Requirements Reports, Records, Retention, and Enforcement § 66.40 Monitoring and reporting program performance... assure compliance with applicable Federal requirements and that performance goals are being achieved...

  2. Multiple ART Programs Create a Dilemma for Providers to Monitor ARV Adherence in Uganda.

    PubMed

    Obua, Celestino; Gusdal, Annelie; Waako, Paul; Chalker, John C; Tomson, Goran; Wahlström, Rolf; Team, The Inrud-Iaa

    2011-01-01

    Increased availability and accessibility of antiretroviral therapy (ART) has improved the length and quality of life amongst people living with HIV/AIDS. This has changed the landscape for care from episodic to long-term care that requires more monitoring of adherence. This has led to increased demand on human resources, a major problem for most ART programs. This paper presents experiences and perspectives of providers in ART facilities, exploring the organizational factors affecting their capacity to monitor adherence to ARVs. From an earlier survey to test adherence indicators and rank facilities as good, medium or poor adherence performances, six facilities were randomly selected, two from each rank. Observations on facility set-up, provider-patient interactions and key informant interviews were carried out. The strengths, weaknesses, opportunities and threats identified by health workers as facilitators or barriers to their capacity to monitor adherence to ARVs were explored during group discussions. Findings show that the performance levels of the facilities were characterized by four different organizational ART programs operating in Uganda, with apparent lack of integration and coordination at the facilities. Of the six facilities studied, the two high adherence performing facilities were Non-Governmental Organization (NGO) programs, while facilities with dual organizational programs (Governmental/NGO) performed poorly. Working conditions, record keeping and the duality of programs underscored the providers' capacity to monitor adherence. Overall 70% of the observed provider-patient interactions were conducted in environments that ensured privacy of the patient. The mean performance for record keeping was 79% and 50% in the high and low performing facilities respectively. Providers often found it difficult to monitor adherence due to the conflicting demands from the different organizational ART programs. Organizational duality at facilities is a major factor in poor adherence monitoring. The different ART programs in Uganda need to be coordinated and integrated into a single well resourced program to improve ART services and adherence monitoring. The focus on long-term care of patients on ART requires that the limitations to providers' capacity for monitoring adherence become central during the planning and implementation of ART programs.

  3. 1996 LMITCO environmental monitoring program report for the Idaho National Engineering and Environmental Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-09-01

    This report describes the calendar year 1996 environmental surveillance and compliance monitoring activities of the Lockheed Martin Idaho Technologies Company Environmental Monitoring Program performed at the Idaho National Engineering and Environmental Laboratory (INEEL). Results of sampling performed by the Radiological Environmental Surveillance, Site Environmental Surveillance, Drinking Water, Effluent Monitoring, Storm Water Monitoring, Groundwater Monitoring, and Special Request Monitoring Programs are included in this report. The primary purposes of the surveillance and monitoring activities are to evaluate environmental conditions, to provide and interpret data, to verify compliance with applicable regulations or standards, and to ensure protection of human health and themore » environment. This report compares 1996 data with program-specific regulatory guidelines and past data to evaluate trends.« less

  4. 14 CFR 1273.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... performance. 1273.40 Section 1273.40 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION... program performance. (a) Monitoring by grantees. Grantees are responsible for managing the day-to-day... assure compliance with applicable Federal requirements and that performance goals are being achieved...

  5. 7 CFR 3015.90 - Scope.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Monitoring and Reporting Program Performance § 3015.90 Scope. This subpart establishes procedures for monitoring and reporting program performance of... grant and subgrant supported activities. ...

  6. 7 CFR 3015.90 - Scope.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Monitoring and Reporting Program Performance § 3015.90 Scope. This subpart establishes procedures for monitoring and reporting program performance of... grant and subgrant supported activities. ...

  7. 7 CFR 3015.90 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Monitoring and Reporting Program Performance § 3015.90 Scope. This subpart establishes procedures for monitoring and reporting program performance of... grant and subgrant supported activities. ...

  8. 7 CFR 3015.90 - Scope.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Monitoring and Reporting Program Performance § 3015.90 Scope. This subpart establishes procedures for monitoring and reporting program performance of... grant and subgrant supported activities. ...

  9. 43 CFR 12.951 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Organizations Post-Award Requirements § 12.951 Monitoring and reporting program performance. (a) Recipients are... award. Recipients shall monitor subawards to ensure subrecipients have met the audit requirements as...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant...

  10. 22 CFR 518.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... or activity supported by the award. Recipients shall monitor subawards to ensure subrecipients have...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... ORGANIZATIONS Post-Award Requirements Reports and Records § 518.51 Monitoring and reporting program performance...

  11. 43 CFR 12.951 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Organizations Post-Award Requirements § 12.951 Monitoring and reporting program performance. (a) Recipients are... award. Recipients shall monitor subawards to ensure subrecipients have met the audit requirements as...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant...

  12. 22 CFR 518.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... or activity supported by the award. Recipients shall monitor subawards to ensure subrecipients have...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... ORGANIZATIONS Post-Award Requirements Reports and Records § 518.51 Monitoring and reporting program performance...

  13. 49 CFR 19.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... or activity supported by the award. Recipients shall monitor subawards to ensure subrecipients have...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... ORGANIZATIONS Post-Award Requirements Reports and Records § 19.51 Monitoring and reporting program performance...

  14. 43 CFR 12.951 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Organizations Post-Award Requirements § 12.951 Monitoring and reporting program performance. (a) Recipients are... award. Recipients shall monitor subawards to ensure subrecipients have met the audit requirements as...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant...

  15. 43 CFR 12.951 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Organizations Post-Award Requirements § 12.951 Monitoring and reporting program performance. (a) Recipients are... award. Recipients shall monitor subawards to ensure subrecipients have met the audit requirements as...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant...

  16. 22 CFR 518.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... or activity supported by the award. Recipients shall monitor subawards to ensure subrecipients have...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... ORGANIZATIONS Post-Award Requirements Reports and Records § 518.51 Monitoring and reporting program performance...

  17. 49 CFR 19.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... or activity supported by the award. Recipients shall monitor subawards to ensure subrecipients have...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... ORGANIZATIONS Post-Award Requirements Reports and Records § 19.51 Monitoring and reporting program performance...

  18. 49 CFR 19.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... or activity supported by the award. Recipients shall monitor subawards to ensure subrecipients have...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... ORGANIZATIONS Post-Award Requirements Reports and Records § 19.51 Monitoring and reporting program performance...

  19. 49 CFR 19.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... or activity supported by the award. Recipients shall monitor subawards to ensure subrecipients have...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... ORGANIZATIONS Post-Award Requirements Reports and Records § 19.51 Monitoring and reporting program performance...

  20. 22 CFR 518.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... or activity supported by the award. Recipients shall monitor subawards to ensure subrecipients have...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... ORGANIZATIONS Post-Award Requirements Reports and Records § 518.51 Monitoring and reporting program performance...

  1. New tools using the hardware performance monitor to help users tune programs on the Cray X-MP

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Engert, D.E.; Rudsinski, L.; Doak, J.

    1991-09-25

    The performance of a Cray system is highly dependent on the tuning techniques used by individuals on their codes. Many of our users were not taking advantage of the tuning tools that allow them to monitor their own programs by using the Hardware Performance Monitor (HPM). We therefore modified UNICOS to collect HPM data for all processes and to report Mflop ratings based on users, programs, and time used. Our tuning efforts are now being focused on the users and programs that have the best potential for performance improvements. These modifications and some of the more striking performance improvements aremore » described.« less

  2. 30 CFR 828.12 - In situ processing: Monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false In situ processing: Monitoring. 828.12 Section... INTERIOR PERMANENT PROGRAM PERFORMANCE STANDARDS SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS-IN SITU PROCESSING § 828.12 In situ processing: Monitoring. (a) Each person who conducts in situ processing...

  3. 30 CFR 828.12 - In situ processing: Monitoring.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false In situ processing: Monitoring. 828.12 Section... INTERIOR PERMANENT PROGRAM PERFORMANCE STANDARDS SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS-IN SITU PROCESSING § 828.12 In situ processing: Monitoring. (a) Each person who conducts in situ processing...

  4. 30 CFR 828.12 - In situ processing: Monitoring.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false In situ processing: Monitoring. 828.12 Section... INTERIOR PERMANENT PROGRAM PERFORMANCE STANDARDS SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS-IN SITU PROCESSING § 828.12 In situ processing: Monitoring. (a) Each person who conducts in situ processing...

  5. 30 CFR 828.12 - In situ processing: Monitoring.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false In situ processing: Monitoring. 828.12 Section... INTERIOR PERMANENT PROGRAM PERFORMANCE STANDARDS SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS-IN SITU PROCESSING § 828.12 In situ processing: Monitoring. (a) Each person who conducts in situ processing...

  6. 30 CFR 828.12 - In situ processing: Monitoring.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false In situ processing: Monitoring. 828.12 Section... INTERIOR PERMANENT PROGRAM PERFORMANCE STANDARDS SPECIAL PERMANENT PROGRAM PERFORMANCE STANDARDS-IN SITU PROCESSING § 828.12 In situ processing: Monitoring. (a) Each person who conducts in situ processing...

  7. 45 CFR 602.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Monitoring and reporting program performance. 602.40 Section 602.40 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE... inspections and certified percentage-of-completion data are relied on heavily by Federal agencies to monitor...

  8. 45 CFR 602.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Monitoring and reporting program performance. 602.40 Section 602.40 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE... inspections and certified percentage-of-completion data are relied on heavily by Federal agencies to monitor...

  9. GUI Type Fault Diagnostic Program for a Turboshaft Engine Using Fuzzy and Neural Networks

    NASA Astrophysics Data System (ADS)

    Kong, Changduk; Koo, Youngju

    2011-04-01

    The helicopter to be operated in a severe flight environmental condition must have a very reliable propulsion system. On-line condition monitoring and fault detection of the engine can promote reliability and availability of the helicopter propulsion system. A hybrid health monitoring program using Fuzzy Logic and Neural Network Algorithms can be proposed. In this hybrid method, the Fuzzy Logic identifies easily the faulted components from engine measuring parameter changes, and the Neural Networks can quantify accurately its identified faults. In order to use effectively the fault diagnostic system, a GUI (Graphical User Interface) type program is newly proposed. This program is composed of the real time monitoring part, the engine condition monitoring part and the fault diagnostic part. The real time monitoring part can display measuring parameters of the study turboshaft engine such as power turbine inlet temperature, exhaust gas temperature, fuel flow, torque and gas generator speed. The engine condition monitoring part can evaluate the engine condition through comparison between monitoring performance parameters the base performance parameters analyzed by the base performance analysis program using look-up tables. The fault diagnostic part can identify and quantify the single faults the multiple faults from the monitoring parameters using hybrid method.

  10. 76 FR 51048 - Notice of Submission of Proposed Information Collection to OMB Ginnie Mae Mortgage-Backed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-17

    ...-Backed Securities programs and to monitor performance and compliance with established rules and... issuers/customers in its Mortgage-Backed Securities programs and to monitor performance and compliance...

  11. 34 CFR 80.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 1 2011-07-01 2011-07-01 false Monitoring and reporting program performance. 80.40 Section 80.40 Education Office of the Secretary, Department of Education UNIFORM ADMINISTRATIVE...) Performance reports will contain, for each grant, brief information on the following: (i) A comparison of...

  12. 34 CFR 80.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 1 2014-07-01 2014-07-01 false Monitoring and reporting program performance. 80.40 Section 80.40 Education Office of the Secretary, Department of Education UNIFORM ADMINISTRATIVE...) Performance reports will contain, for each grant, brief information on the following: (i) A comparison of...

  13. 34 CFR 80.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 1 2012-07-01 2012-07-01 false Monitoring and reporting program performance. 80.40 Section 80.40 Education Office of the Secretary, Department of Education UNIFORM ADMINISTRATIVE...) Performance reports will contain, for each grant, brief information on the following: (i) A comparison of...

  14. 34 CFR 80.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 1 2013-07-01 2013-07-01 false Monitoring and reporting program performance. 80.40 Section 80.40 Education Office of the Secretary, Department of Education UNIFORM ADMINISTRATIVE...) Performance reports will contain, for each grant, brief information on the following: (i) A comparison of...

  15. The Automated Instrumentation and Monitoring System (AIMS): Design and Architecture. 3.2

    NASA Technical Reports Server (NTRS)

    Yan, Jerry C.; Schmidt, Melisa; Schulbach, Cathy; Bailey, David (Technical Monitor)

    1997-01-01

    Whether a researcher is designing the 'next parallel programming paradigm', another 'scalable multiprocessor' or investigating resource allocation algorithms for multiprocessors, a facility that enables parallel program execution to be captured and displayed is invaluable. Careful analysis of such information can help computer and software architects to capture, and therefore, exploit behavioral variations among/within various parallel programs to take advantage of specific hardware characteristics. A software tool-set that facilitates performance evaluation of parallel applications on multiprocessors has been put together at NASA Ames Research Center under the sponsorship of NASA's High Performance Computing and Communications Program over the past five years. The Automated Instrumentation and Monitoring Systematic has three major software components: a source code instrumentor which automatically inserts active event recorders into program source code before compilation; a run-time performance monitoring library which collects performance data; and a visualization tool-set which reconstructs program execution based on the data collected. Besides being used as a prototype for developing new techniques for instrumenting, monitoring and presenting parallel program execution, AIMS is also being incorporated into the run-time environments of various hardware testbeds to evaluate their impact on user productivity. Currently, the execution of FORTRAN and C programs on the Intel Paragon and PALM workstations can be automatically instrumented and monitored. Performance data thus collected can be displayed graphically on various workstations. The process of performance tuning with AIMS will be illustrated using various NAB Parallel Benchmarks. This report includes a description of the internal architecture of AIMS and a listing of the source code.

  16. 21 CFR 1403.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Monitoring and reporting program performance. 1403.40 Section 1403.40 Food and Drugs OFFICE OF NATIONAL DRUG CONTROL POLICY UNIFORM ADMINISTRATIVE... developments. Events may occur between the scheduled performance reporting dates which have significant impact...

  17. 25 CFR 276.9 - Monitoring and reporting program performances.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... EDUCATION ASSISTANCE ACT PROGRAM UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS § 276.9 Monitoring and... the following for each program, function, or activity involved: (1) A comparison of actual...

  18. 25 CFR 276.9 - Monitoring and reporting program performances.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... EDUCATION ASSISTANCE ACT PROGRAM UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS § 276.9 Monitoring and... the following for each program, function, or activity involved: (1) A comparison of actual...

  19. 25 CFR 276.9 - Monitoring and reporting program performances.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... EDUCATION ASSISTANCE ACT PROGRAM UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS § 276.9 Monitoring and... the following for each program, function, or activity involved: (1) A comparison of actual...

  20. Shared performance monitor in a multiprocessor system

    DOEpatents

    Chiu, George; Gara, Alan G; Salapura, Valentina

    2014-12-02

    A performance monitoring unit (PMU) and method for monitoring performance of events occurring in a multiprocessor system. The multiprocessor system comprises a plurality of processor devices units, each processor device for generating signals representing occurrences of events in the processor device, and, a single shared counter resource for performance monitoring. The performance monitor unit is shared by all processor cores in the multiprocessor system. The PMU is further programmed to monitor event signals issued from non-processor devices.

  1. 20 CFR 435.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Monitoring and reporting program performance. 435.51 Section 435.51 Employees' Benefits SOCIAL SECURITY ADMINISTRATION UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT...

  2. 40 CFR 35.6755 - Monitoring program performance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Monitoring program performance. 35.6755 Section 35.6755 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund...

  3. 40 CFR 35.6755 - Monitoring program performance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Monitoring program performance. 35.6755 Section 35.6755 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund...

  4. 38 CFR 49.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 49.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing...

  5. 38 CFR 49.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 49.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing...

  6. 38 CFR 49.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 49.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing...

  7. 38 CFR 49.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 49.51 Monitoring and reporting program performance. (a) Recipients are responsible for managing...

  8. The Automated Instrumentation and Monitoring System (AIMS) reference manual

    NASA Technical Reports Server (NTRS)

    Yan, Jerry; Hontalas, Philip; Listgarten, Sherry

    1993-01-01

    Whether a researcher is designing the 'next parallel programming paradigm,' another 'scalable multiprocessor' or investigating resource allocation algorithms for multiprocessors, a facility that enables parallel program execution to be captured and displayed is invaluable. Careful analysis of execution traces can help computer designers and software architects to uncover system behavior and to take advantage of specific application characteristics and hardware features. A software tool kit that facilitates performance evaluation of parallel applications on multiprocessors is described. The Automated Instrumentation and Monitoring System (AIMS) has four major software components: a source code instrumentor which automatically inserts active event recorders into the program's source code before compilation; a run time performance-monitoring library, which collects performance data; a trace file animation and analysis tool kit which reconstructs program execution from the trace file; and a trace post-processor which compensate for data collection overhead. Besides being used as prototype for developing new techniques for instrumenting, monitoring, and visualizing parallel program execution, AIMS is also being incorporated into the run-time environments of various hardware test beds to evaluate their impact on user productivity. Currently, AIMS instrumentors accept FORTRAN and C parallel programs written for Intel's NX operating system on the iPSC family of multi computers. A run-time performance-monitoring library for the iPSC/860 is included in this release. We plan to release monitors for other platforms (such as PVM and TMC's CM-5) in the near future. Performance data collected can be graphically displayed on workstations (e.g. Sun Sparc and SGI) supporting X-Windows (in particular, Xl IR5, Motif 1.1.3).

  9. 7 CFR 3016.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Monitoring and reporting program performance. 3016.40 Section 3016.40 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF THE CHIEF FINANCIAL OFFICER, DEPARTMENT OF AGRICULTURE UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND COOPERATIVE...

  10. 24 CFR 84.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...) Recipients shall immediately notify HUD of developments that have a significant impact on the award-supported... OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 84.51 Monitoring and reporting program performance. (a) Recipients are responsible for...

  11. 24 CFR 84.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ...) Recipients shall immediately notify HUD of developments that have a significant impact on the award-supported... OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 84.51 Monitoring and reporting program performance. (a) Recipients are responsible for...

  12. 24 CFR 84.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...) Recipients shall immediately notify HUD of developments that have a significant impact on the award-supported... OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 84.51 Monitoring and reporting program performance. (a) Recipients are responsible for...

  13. 24 CFR 84.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ...) Recipients shall immediately notify HUD of developments that have a significant impact on the award-supported... OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Reports and Records § 84.51 Monitoring and reporting program performance. (a) Recipients are responsible for...

  14. 29 CFR 1470.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 4 2010-07-01 2010-07-01 false Monitoring and reporting program performance. 1470.40 Section 1470.40 Labor Regulations Relating to Labor (Continued) FEDERAL MEDIATION AND CONCILIATION SERVICE... not met. (iii) Additional pertinent information including, when appropriate, analysis and explanation...

  15. Instrumentation, performance visualization, and debugging tools for multiprocessors

    NASA Technical Reports Server (NTRS)

    Yan, Jerry C.; Fineman, Charles E.; Hontalas, Philip J.

    1991-01-01

    The need for computing power has forced a migration from serial computation on a single processor to parallel processing on multiprocessor architectures. However, without effective means to monitor (and visualize) program execution, debugging, and tuning parallel programs becomes intractably difficult as program complexity increases with the number of processors. Research on performance evaluation tools for multiprocessors is being carried out at ARC. Besides investigating new techniques for instrumenting, monitoring, and presenting the state of parallel program execution in a coherent and user-friendly manner, prototypes of software tools are being incorporated into the run-time environments of various hardware testbeds to evaluate their impact on user productivity. Our current tool set, the Ames Instrumentation Systems (AIMS), incorporates features from various software systems developed in academia and industry. The execution of FORTRAN programs on the Intel iPSC/860 can be automatically instrumented and monitored. Performance data collected in this manner can be displayed graphically on workstations supporting X-Windows. We have successfully compared various parallel algorithms for computational fluid dynamics (CFD) applications in collaboration with scientists from the Numerical Aerodynamic Simulation Systems Division. By performing these comparisons, we show that performance monitors and debuggers such as AIMS are practical and can illuminate the complex dynamics that occur within parallel programs.

  16. Software design of a remote real-time ECG monitoring system

    NASA Astrophysics Data System (ADS)

    Yu, Chengbo; Tao, Hongyan

    2005-12-01

    Heart disease is one of the main diseases that threaten the health and lives of human beings. At present, the normal remote ECG monitoring system has the disadvantages of a short testing distance and limitation of monitoring lines. Because of accident and paroxysmal disease, ECG monitoring has extended from the hospital to the family. Therefore, remote ECG monitoring through the Internet has the actual value and significance. The principle and design method of software of the remote dynamic ECG monitor was presented and discussed. The monitoring software is programmed with Delphi software based on client-sever interactive mode. The application program of the system, which makes use of multithreading technology, is shown to perform in an excellent manner. The program includes remote link users and ECG processing, i.e. ECG data's receiving, real-time displaying, recording and replaying. The system can connect many clients simultaneously and perform real-time monitoring to patients.

  17. 22 CFR 226.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Monitoring and reporting program performance. 226.51 Section 226.51 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Reports and Records § 226.51...

  18. 24 CFR 85.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Monitoring and reporting program performance. 85.40 Section 85.40 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND COOPERATIVE AGREEMENTS TO STATE...

  19. 20 CFR 435.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false Monitoring and reporting program performance. 435.51 Section 435.51 Employees' Benefits SOCIAL SECURITY ADMINISTRATION UNIFORM ADMINISTRATIVE... ensure subrecipients have met the audit requirements as delineated in § 435.26. (b) SSA will prescribe...

  20. 40 CFR 60.1715 - What types of continuous emission monitoring must I perform?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission Guidelines... must I perform? To continuously monitor emissions, you must perform four tasks: (a) Install continuous...

  1. 7 CFR 3015.91 - Monitoring by recipients.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...-supported activities to assure that performance goals are being achieved. Recipient monitoring shall cover... 7 Agriculture 15 2013-01-01 2013-01-01 false Monitoring by recipients. 3015.91 Section 3015.91..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Monitoring and Reporting Program Performance...

  2. 7 CFR 3015.91 - Monitoring by recipients.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...-supported activities to assure that performance goals are being achieved. Recipient monitoring shall cover... 7 Agriculture 15 2014-01-01 2014-01-01 false Monitoring by recipients. 3015.91 Section 3015.91..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Monitoring and Reporting Program Performance...

  3. 7 CFR 3015.91 - Monitoring by recipients.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...-supported activities to assure that performance goals are being achieved. Recipient monitoring shall cover... 7 Agriculture 15 2012-01-01 2012-01-01 false Monitoring by recipients. 3015.91 Section 3015.91..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Monitoring and Reporting Program Performance...

  4. 7 CFR 3015.91 - Monitoring by recipients.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...-supported activities to assure that performance goals are being achieved. Recipient monitoring shall cover... 7 Agriculture 15 2011-01-01 2011-01-01 false Monitoring by recipients. 3015.91 Section 3015.91..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Monitoring and Reporting Program Performance...

  5. 32 CFR 33.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 1 2014-07-01 2014-07-01 false Monitoring and reporting program performance. 33.40 Section 33.40 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT... STATE AND LOCAL GOVERNMENTS Post-Award Requirements Reports, Records, Retention, and Enforcement § 33.40...

  6. 32 CFR 33.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Monitoring and reporting program performance. 33.40 Section 33.40 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT... STATE AND LOCAL GOVERNMENTS Post-Award Requirements Reports, Records, Retention, and Enforcement § 33.40...

  7. 32 CFR 33.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 1 2013-07-01 2013-07-01 false Monitoring and reporting program performance. 33.40 Section 33.40 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT... STATE AND LOCAL GOVERNMENTS Post-Award Requirements Reports, Records, Retention, and Enforcement § 33.40...

  8. 32 CFR 33.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 1 2012-07-01 2012-07-01 false Monitoring and reporting program performance. 33.40 Section 33.40 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT... STATE AND LOCAL GOVERNMENTS Post-Award Requirements Reports, Records, Retention, and Enforcement § 33.40...

  9. 32 CFR 33.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 1 2011-07-01 2011-07-01 false Monitoring and reporting program performance. 33.40 Section 33.40 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT... STATE AND LOCAL GOVERNMENTS Post-Award Requirements Reports, Records, Retention, and Enforcement § 33.40...

  10. Monitoring student attendance, participation, and performance improvement: an instrument and forms.

    PubMed

    Kosta, Joanne

    2012-01-01

    When students receive consistent and fair feedback about their behavior, program liability decreases. To help students to have a clearer understanding of minimum program standards and the consequences of substandard performance, the author developed attendance and participation monitoring and performance improvement instruments. The author discusses the tools that address absenteeism, tardiness, unprofessional, and unsafe clinical behaviors among students.

  11. Performance Metrics for Monitoring Parallel Program Executions

    NASA Technical Reports Server (NTRS)

    Sarukkai, Sekkar R.; Gotwais, Jacob K.; Yan, Jerry; Lum, Henry, Jr. (Technical Monitor)

    1994-01-01

    Existing tools for debugging performance of parallel programs either provide graphical representations of program execution or profiles of program executions. However, for performance debugging tools to be useful, such information has to be augmented with information that highlights the cause of poor program performance. Identifying the cause of poor performance necessitates the need for not only determining the significance of various performance problems on the execution time of the program, but also needs to consider the effect of interprocessor communications of individual source level data structures. In this paper, we present a suite of normalized indices which provide a convenient mechanism for focusing on a region of code with poor performance and highlights the cause of the problem in terms of processors, procedures and data structure interactions. All the indices are generated from trace files augmented with data structure information.. Further, we show with the help of examples from the NAS benchmark suite that the indices help in detecting potential cause of poor performance, based on augmented execution traces obtained by monitoring the program.

  12. 49 CFR 26.37 - What are a recipient's responsibilities for monitoring the performance of other program...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 1 2011-10-01 2011-10-01 false What are a recipient's responsibilities for... Contracting § 26.37 What are a recipient's responsibilities for monitoring the performance of other program participants? (a) You must implement appropriate mechanisms to ensure compliance with the part's requirements...

  13. 49 CFR 26.37 - What are a recipient's responsibilities for monitoring the performance of other program...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 1 2014-10-01 2014-10-01 false What are a recipient's responsibilities for... Contracting § 26.37 What are a recipient's responsibilities for monitoring the performance of other program participants? (a) You must implement appropriate mechanisms to ensure compliance with the part's requirements...

  14. 49 CFR 26.37 - What are a recipient's responsibilities for monitoring the performance of other program...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 1 2012-10-01 2012-10-01 false What are a recipient's responsibilities for... Contracting § 26.37 What are a recipient's responsibilities for monitoring the performance of other program participants? (a) You must implement appropriate mechanisms to ensure compliance with the part's requirements...

  15. 49 CFR 26.37 - What are a recipient's responsibilities for monitoring the performance of other program...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 1 2013-10-01 2013-10-01 false What are a recipient's responsibilities for... Contracting § 26.37 What are a recipient's responsibilities for monitoring the performance of other program participants? (a) You must implement appropriate mechanisms to ensure compliance with the part's requirements...

  16. In Vivo Monitoring Program Manual, PNL-MA-574, Rev 5.1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynch, Timothy P.

    2011-09-12

    The following sections provide an overview of the administration for the In Vivo Monitoring Program (IVMP) for Hanford. This includes the organizational structure and program responsibilities; coordination of in vivo measurements; scheduling measurements; performing measurements; reporting results; and quality assurance.

  17. 20 CFR 435.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., program, subaward, function or activity supported by the award. Recipients must monitor subawards to...) Recipients must immediately notify SSA of developments that have a significant impact on the award-supported... ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Reports and Records § 435.51 Monitoring and...

  18. 20 CFR 435.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., program, subaward, function or activity supported by the award. Recipients must monitor subawards to...) Recipients must immediately notify SSA of developments that have a significant impact on the award-supported... ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Reports and Records § 435.51 Monitoring and...

  19. 20 CFR 435.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., program, subaward, function or activity supported by the award. Recipients must monitor subawards to...) Recipients must immediately notify SSA of developments that have a significant impact on the award-supported... ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Reports and Records § 435.51 Monitoring and...

  20. Development of the Diabetes Technology Society Blood Glucose Monitor System Surveillance Protocol.

    PubMed

    Klonoff, David C; Lias, Courtney; Beck, Stayce; Parkes, Joan Lee; Kovatchev, Boris; Vigersky, Robert A; Arreaza-Rubin, Guillermo; Burk, Robert D; Kowalski, Aaron; Little, Randie; Nichols, James; Petersen, Matt; Rawlings, Kelly; Sacks, David B; Sampson, Eric; Scott, Steve; Seley, Jane Jeffrie; Slingerland, Robbert; Vesper, Hubert W

    2016-05-01

    Inaccurate blood glucsoe monitoring systems (BGMSs) can lead to adverse health effects. The Diabetes Technology Society (DTS) Surveillance Program for cleared BGMSs is intended to protect people with diabetes from inaccurate, unreliable BGMS products that are currently on the market in the United States. The Surveillance Program will provide an independent assessment of the analytical performance of cleared BGMSs. The DTS BGMS Surveillance Program Steering Committee included experts in glucose monitoring, surveillance testing, and regulatory science. Over one year, the committee engaged in meetings and teleconferences aiming to describe how to conduct BGMS surveillance studies in a scientifically sound manner that is in compliance with good clinical practice and all relevant regulations. A clinical surveillance protocol was created that contains performance targets and analytical accuracy-testing studies with marketed BGMS products conducted by qualified clinical and laboratory sites. This protocol entitled "Protocol for the Diabetes Technology Society Blood Glucose Monitor System Surveillance Program" is attached as supplementary material. This program is needed because currently once a BGMS product has been cleared for use by the FDA, no systematic postmarket Surveillance Program exists that can monitor analytical performance and detect potential problems. This protocol will allow identification of inaccurate and unreliable BGMSs currently available on the US market. The DTS Surveillance Program will provide BGMS manufacturers a benchmark to understand the postmarket analytical performance of their products. Furthermore, patients, health care professionals, payers, and regulatory agencies will be able to use the results of the study to make informed decisions to, respectively, select, prescribe, finance, and regulate BGMSs on the market. © 2015 Diabetes Technology Society.

  1. Development and Progression of a Model: Prospective Research Compliance Monitoring

    ERIC Educational Resources Information Center

    Fedor, Carol; Ferrazzano Yaussy, Cristina; Cola, Philip A.

    2008-01-01

    Recent trends in Human Research Protection Programs (HRPPs) have contributed to the rising emphasis on prospective monitoring of clinical research and education programs. Therefore, internal efforts and resources to monitor investigator compliance and site performance have become an important focus in the conduct of clinical research. Once the…

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.; Diefenderfer, Heida L.

    The purpose of this document is to describe research, monitoring, and evaluation (RME) for the Federal Columbia River Estuary Program, hereafter called 'the Estuary Program'. The intent of this RME effort is to provide data and information to evaluate progress toward meeting program goals and objectives and support decision making in the Estuary Program. The goal of the Estuary Program is to understand, conserve, and restore the estuary ecosystem to improve the performance of listed salmonid populations. The Estuary Program has five general objectives, designed to fulfill the program goal, as follows: (1) Understand the primary stressors affecting ecosystem controllingmore » factors, such as ocean conditions and invasive species. (2) Conserve and restore factors controlling ecosystem structures and processes, such as hydrodynamics and water quality. (3) Increase the quantity and quality of ecosystem structures, i.e., habitats, juvenile salmonids use during migration through the estuary. (4) Maintain the food web to benefit salmonid performance. (5) Improve salmonid performance in terms of life history diversity, foraging success, growth, and survival. The goal of estuary RME is to provide pertinent and timely research and monitoring information to planners, implementers, and managers of the Estuary Program. The goal leads to three primary management questions pertaining to the main focus of the Estuary Program: estuary habitat conservation and restoration. (1) Are the estuary habitat actions achieving the expected biological and environmental performance targets? (2) Are the offsite habitat actions in the estuary improving juvenile salmonid performance and which actions are most effective at addressing the limiting factors preventing achievement of habitat, fish, or wildlife performance objectives? (3) What are the limiting factors or threats in the estuary/ocean preventing the achievement of desired habitat or fish performance objectives? Performance measures for the estuary are monitored indicators that reflect the status of habitat conditions and fish performance, e.g., habitat connectivity, survival, and life history diversity. Performance measures also pertain to implementation and compliance. Such measures are part of the monitoring, research, and action plans in this estuary RME document. Performance targets specific to the estuary were not included in the 2007 draft Biological Opinion.« less

  3. Using Multilevel Analysis to Monitor Test Performance across Administrations. Research Report. ETS RR-14-29

    ERIC Educational Resources Information Center

    Wei, Youhua; Qu, Yanxuan

    2014-01-01

    For a testing program with frequent administrations, it is important to understand and monitor the stability and fluctuation of test performance across administrations. Different methods have been proposed for this purpose. This study explored the potential of using multilevel analysis to understand and monitor examinees' test performance across…

  4. Pulse Power--A Heart Physiology Program for Children.

    ERIC Educational Resources Information Center

    Hinson, Curt

    1994-01-01

    Primary grade students at a Delaware elementary school currently participate in the Pulse Power heart physiology program. Students receive mastery instruction and use heart monitors to exercise performance throughout the 6-phase program. Data from homework and from the heart monitors identify student progress, knowledge, and cardiovascular…

  5. 7 CFR 1484.74 - How is Cooperator program compliance monitored?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... is Cooperator program compliance monitored? (a) The Compliance Review Staff (CRS), FAS, performs... pursuant to § 1550.20(a)(14), FAS will consider the Cooperator's overall marketing budget from year to year...

  6. 1998 Environmental Monitoring Program Report for the Idaho National Engineering and Environmental Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    L. V. Street

    This report describes the calendar year 1998 compliance monitoring and environmental surveillance activities of the Lockheed Martin Idaho Technologies Company Environmental Monitoring Program performed at the Idaho National Engineering and Environmental Laboratory. This report includes results of sampling performed by the Drinking Water, Effluent, Storm Water, Groundwater Monitoring, and Environmental Surveillance Programs. This report compares the 1998 results to program-specific regulatory guidelines and past data to evaluate trends. The primary purposes of the monitoring and surveillance activities are to evaluate environmental conditions, to provide and interpret data, to verify compliance with applicable regulations or standards, and to ensure protection ofmore » public health and the environment. Surveillance of environmental media did not identify any previously unknown environmental problems or trends, which would indicate a loss of control or unplanned releases from facility operations. The INEEL complied with permits and applicable regulations, with the exception of nitrogen samples in a disposal pond effluent stream and iron and total coliform bacteria in groundwater downgradient from one disposal pond. Data collected by the Environmental Monitoring Program demonstrate that the public health and environment were protected.« less

  7. A program downloader and other utility software for the DATAC bus monitor unit

    NASA Technical Reports Server (NTRS)

    Novacki, Stanley M., III

    1987-01-01

    A set or programs designed to facilitate software testing on the DATAC Bus Monitor is described. By providing a means to simplify program loading, firmware generation, and subsequent testing of programs, the overhead involved in software evaluation is reduced and that time is used more productively in performance, analysis and improvement of current software.

  8. Development of the Diabetes Technology Society Blood Glucose Monitor System Surveillance Protocol

    PubMed Central

    Klonoff, David C.; Lias, Courtney; Beck, Stayce; Parkes, Joan Lee; Kovatchev, Boris; Vigersky, Robert A.; Arreaza-Rubin, Guillermo; Burk, Robert D.; Kowalski, Aaron; Little, Randie; Nichols, James; Petersen, Matt; Rawlings, Kelly; Sacks, David B.; Sampson, Eric; Scott, Steve; Seley, Jane Jeffrie; Slingerland, Robbert; Vesper, Hubert W.

    2015-01-01

    Background: Inaccurate blood glucsoe monitoring systems (BGMSs) can lead to adverse health effects. The Diabetes Technology Society (DTS) Surveillance Program for cleared BGMSs is intended to protect people with diabetes from inaccurate, unreliable BGMS products that are currently on the market in the United States. The Surveillance Program will provide an independent assessment of the analytical performance of cleared BGMSs. Methods: The DTS BGMS Surveillance Program Steering Committee included experts in glucose monitoring, surveillance testing, and regulatory science. Over one year, the committee engaged in meetings and teleconferences aiming to describe how to conduct BGMS surveillance studies in a scientifically sound manner that is in compliance with good clinical practice and all relevant regulations. Results: A clinical surveillance protocol was created that contains performance targets and analytical accuracy-testing studies with marketed BGMS products conducted by qualified clinical and laboratory sites. This protocol entitled “Protocol for the Diabetes Technology Society Blood Glucose Monitor System Surveillance Program” is attached as supplementary material. Conclusion: This program is needed because currently once a BGMS product has been cleared for use by the FDA, no systematic postmarket Surveillance Program exists that can monitor analytical performance and detect potential problems. This protocol will allow identification of inaccurate and unreliable BGMSs currently available on the US market. The DTS Surveillance Program will provide BGMS manufacturers a benchmark to understand the postmarket analytical performance of their products. Furthermore, patients, health care professionals, payers, and regulatory agencies will be able to use the results of the study to make informed decisions to, respectively, select, prescribe, finance, and regulate BGMSs on the market. PMID:26481642

  9. 40 CFR 60.1225 - What types of continuous emission monitoring must I perform?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Small Municipal Waste Combustion Units for Which Construction is Commenced After August 30... emissions, you must perform four tasks: (a) Install continuous emission monitoring systems for certain...

  10. GPS Civil Monitoring Performance Specification

    DOT National Transportation Integrated Search

    2009-02-10

    This Civil Monitoring Performance Specification (CMPS) is published and maintained at : the direction of the Program Manager for Civil Applications, Global Positioning Systems : Wing (GPSW). The purpose of this document is to provide a comprehensive ...

  11. Long-term monitoring of Sacramento Shade program trees: tree survival, growth and energy-saving performance

    Treesearch

    Yekang Ko; Jun-Hak Lee; E. Gregory McPherson; Lara A. Roman

    2015-01-01

    Long-term survival and growth of urban forests are critical to achieve the targeted benefits of urban tree planting programs, such as building energy savings from tree shade. However, little is known about how trees perform in the long-term, especially in residential areas. Given this gap in the literature, we monitored 22-years of post-planting survival, growth, and...

  12. 40 CFR Appendix A to Part 58 - Quality Assurance Requirements for SLAMS, SPMs and PSD Air Monitoring

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... in section 4.3.1 of this appendix. 3.2.7PM2.5 Performance Evaluation Program (PEP) Procedures. The... evaluation audit means that both the primary monitor and PEP audit concentrations are valid and above 3 µg/m3... Evaluation Program (PEP) Procedures. Each year, one performance evaluation audit, as described in section 3.2...

  13. 40 CFR Appendix A to Part 58 - Quality Assurance Requirements for SLAMS, SPMs and PSD Air Monitoring

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... in section 4.3.1 of this appendix. 3.2.7PM2.5 Performance Evaluation Program (PEP) Procedures. The... evaluation audit means that both the primary monitor and PEP audit concentrations are valid and above 3 µg/m3... Evaluation Program (PEP) Procedures. Each year, one performance evaluation audit, as described in section 3.2...

  14. Long-term fish monitoring in large rivers: Utility of “benchmarking” across basins

    USGS Publications Warehouse

    Ward, David L.; Casper, Andrew F.; Counihan, Timothy D.; Bayer, Jennifer M.; Waite, Ian R.; Kosovich, John J.; Chapman, Colin; Irwin, Elise R.; Sauer, Jennifer S.; Ickes, Brian; McKerrow, Alexa

    2017-01-01

    In business, benchmarking is a widely used practice of comparing your own business processes to those of other comparable companies and incorporating identified best practices to improve performance. Biologists and resource managers designing and conducting monitoring programs for fish in large river systems tend to focus on single river basins or segments of large rivers, missing opportunities to learn from those conducting fish monitoring in other rivers. We briefly examine five long-term fish monitoring programs in large rivers in the United States (Colorado, Columbia, Mississippi, Illinois, and Tallapoosa rivers) and identify opportunities for learning across programs by detailing best monitoring practices and why these practices were chosen. Although monitoring objectives, methods, and program maturity differ between each river system, examples from these five case studies illustrate the important role that long-term monitoring programs play in interpreting temporal and spatial shifts in fish populations for both established objectives and newly emerging questions. We suggest that deliberate efforts to develop a broader collaborative network through benchmarking will facilitate sharing of ideas and development of more effective monitoring programs.

  15. 7 CFR 550.26 - Monitoring program performance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... policies, as long as they are consistent with REE requirements. However, in order to fulfill their role in... is being performed in compliance with the terms and conditions of the award. (b) Monitoring of a...

  16. Global positioning system (GPS) civil monitoring performance specification.

    DOT National Transportation Integrated Search

    2009-04-30

    This Civil Monitoring Performance Specification (CMPS) is published and maintained at : the direction of the Program Manager for Civil Applications, Global Positioning Systems : Wing (GPSW). The purpose of this document is to provide a comprehensive ...

  17. Modular biowaste monitoring system

    NASA Technical Reports Server (NTRS)

    Fogal, G. L.

    1975-01-01

    The objective of the Modular Biowaste Monitoring System Program was to generate and evaluate hardware for supporting shuttle life science experimental and diagnostic programs. An initial conceptual design effort established requirements and defined an overall modular system for the collection, measurement, sampling and storage of urine and feces biowastes. This conceptual design effort was followed by the design, fabrication and performance evaluation of a flight prototype model urine collection, volume measurement and sampling capability. No operational or performance deficiencies were uncovered as a result of the performance evaluation tests.

  18. Demonstration of subsidence monitoring system

    NASA Astrophysics Data System (ADS)

    Conroy, P. J.; Gyarmaty, J. H.; Pearson, M. L.

    1981-06-01

    Data on coal mine subsidence were studied as a basis for the development of subsidence control technology. Installation, monitoring, and evaluation of three subsidence monitoring instrument systems were examined: structure performance, performance of supported systems, and performance of caving systems. Objectives of the instrument program were: (1) to select, test, assemble, install, monitor, and maintain all instrumentation required for implementing the three subsidence monitoring systems; and (2) to evaluate performance of each instrument individually and as part of the appropriate monitoring system or systems. The use of an automatic level and a rod extensometer for measuring structure performance, and the automatic level, steel tape extensometer, FPBX, FPBI, USBM borehole deformation gauge, and vibrating wire stressmeters for measuring the performance of caving systems are recommended.

  19. Improved Real-Time Monitoring Using Multiple Expert Systems

    NASA Technical Reports Server (NTRS)

    Schwuttke, Ursula M.; Angelino, Robert; Quan, Alan G.; Veregge, John; Childs, Cynthia

    1993-01-01

    Monitor/Analyzer of Real-Time Voyager Engineering Link (MARVEL) computer program implements combination of techniques of both conventional automation and artificial intelligence to improve monitoring of complicated engineering system. Designed to support ground-based operations of Voyager spacecraft, also adapted to other systems. Enables more-accurate monitoring and analysis of telemetry, enhances productivity of monitoring personnel, reduces required number of such personnel by performing routine monitoring tasks, and helps ensure consistency in face of turnover of personnel. Programmed in C language and includes commercial expert-system software shell also written in C.

  20. 45 CFR 1183.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... FOUNDATION ON THE ARTS AND THE HUMANITIES INSTITUTE OF MUSEUM AND LIBRARY SERVICES UNIFORM ADMINISTRATIVE... must cover each program, function or activity. (b) Nonconstruction performance reports. The Federal...

  1. U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA) ENVIRONMENTAL TECHNOLOGY VERIFICATION (ETV) PROGRAM: ARSENIC MONITORING TECHNOLOGIES

    EPA Science Inventory

    The U.S. Environmental Protection Agency Environmental Technology Verification (ETV) program evaluates the performance of innovative air, water, pollution prevention and monitoring technologies that have the potential to improve human health and the environment. This technology ...

  2. Ecological Monitoring and Compliance Program 2007 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Dennis; Anderson, David; Derek, Hall

    2008-03-01

    In accordance with U.S. Department of Energy (DOE) Order 450.1, 'Environmental Protection Program', the Office of the Assistant Manager for Environmental Management of the DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) requires ecological monitoring and biological compliance support for activities and programs conducted at the Nevada Test Site (NTS). National Security Technologies, LLC (NSTec), Ecological Services has implemented the Ecological Monitoring and Compliance (EMAC) Program to provide this support. EMAC is designed to ensure compliance with applicable laws and regulations, delineate and define NTS ecosystems, and provide ecological information that can be used to predict and evaluate themore » potential impacts of proposed projects and programs on those ecosystems. This report summarizes the EMAC activities conducted by NSTec during calendar year 2007. Monitoring tasks during 2007 included eight program areas: (a) biological surveys, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) biological monitoring at the Nonproliferation Test and Evaluation Complex (NPTEC). The following sections of this report describe work performed under these eight areas.« less

  3. 40 CFR 60.1760 - What is required for my continuous opacity monitoring system and how are the data used?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY... monitoring system according to § 60.13. (c) Complete an initial evaluation of your continuous opacity monitoring system according to Performance Specification 1 in appendix B of this part. Complete the...

  4. 49 CFR 110.90 - Grant monitoring, reports, and records retention.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... performance of supported activities to assure compliance with applicable Federal requirements and achievement of performance goals. Monitoring must cover each program, function, activity, or task covered by the... shall submit a performance report at the completion of an activity for which reimbursement is being...

  5. Comprehensive Monitoring Program: Air Quality Data Assessment Report for FY90. Volume 2. Version 3.1

    DTIC Science & Technology

    1991-09-01

    91311R01 If VERSION 3.10) VOLUME II Comm 2ND COPY COMPREHENSIVE MONITORING PROGRAM Contract Number DAAAI5-87-0095 AIR QUALITY DATA ASSESSMENT REPORT...MONITORING PROGRAM. FINAL AIR QUALITY DATA ASSESSMENT REPORT FOR FY90, VERSION 3.1 NONE 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRES.S(S) 8...RELEASE; DISTRIBUTION IS UNLIMITED 13. ABSTRACT (Maximum 200 words) THE OBJECTIVE OF THIS CMP IS TO: VERIFY AND EVALUATE POTENTIAL AIR QUALITY HEALTH

  6. U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA) ENVIRONMENTAL TECHNOLOGY VERIFICATION (ETV) PROGRAM: MERCURY CONTINUOUS EMISSION MONITORS

    EPA Science Inventory

    The U.S. Environmental Protection Agency (EPA) Environmental Technology Verification (ETV) program evaluates the performance of innovative air, water, pollution prevention and monitoring technologies that have the potential to improve human health and the environment. This techn...

  7. GROUND WATER SAMPLING ISSUES

    EPA Science Inventory

    Obtaining representative ground water samples is important for site assessment and
    remedial performance monitoring objectives. Issues which must be considered prior to initiating a ground-water monitoring program include defining monitoring goals and objectives, sampling point...

  8. 29 CFR 1954.2 - Monitoring system.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 9 2014-07-01 2014-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...

  9. 29 CFR 1954.2 - Monitoring system.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 9 2013-07-01 2013-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...

  10. 29 CFR 1954.2 - Monitoring system.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 9 2012-07-01 2012-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...

  11. 29 CFR 1954.2 - Monitoring system.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...

  12. 29 CFR 1954.2 - Monitoring system.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 9 2011-07-01 2011-07-01 false Monitoring system. 1954.2 Section 1954.2 Labor Regulations...) PROCEDURES FOR THE EVALUATION AND MONITORING OF APPROVED STATE PLANS General § 1954.2 Monitoring system. (a... Act, the Assistant Secretary has established a State Program Performance Monitoring System. Evaluation...

  13. 30 CFR 817.14 - Casing and sealing of underground openings: Temporary.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., DEPARTMENT OF THE INTERIOR PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS... workings, or to be used to monitor ground water conditions, shall be temporarily sealed until actual use. ...

  14. Ten-year monitoring of high-rise building columns using long-gauge fiber optic sensors

    NASA Astrophysics Data System (ADS)

    Glisic, B.; Inaudi, D.; Lau, J. M.; Fong, C. C.

    2013-05-01

    A large-scale lifetime building monitoring program was implemented in Singapore in 2001. The monitoring aims of this unique program were to increase safety, verify performance, control quality, increase knowledge, optimize maintenance costs, and evaluate the condition of the structures after a hazardous event. The first instrumented building, which has now been monitored for more than ten years, is presented in this paper. The long-gauge fiber optic strain sensors were embedded in fresh concrete of ground-level columns, thus the monitoring started at the birth of both the construction material and the structure. Measurement sessions were performed during construction, upon completion of each new story and the roof, and after the construction, i.e., in-service. Based on results it was possible to follow and evaluate long-term behavior of the building through every stage of its life. The results of monitoring were analyzed at a local (column) and global (building) level. Over-dimensioning of one column was identified. Differential settlement of foundations was detected, localized, and its magnitude estimated. Post-tremor analysis was performed. Real long-term behavior of concrete columns was assessed. Finally, the long-term performance of the monitoring system was evaluated. The researched monitoring method, monitoring system, rich results gathered over approximately ten years, data analysis algorithms, and the conclusions on the structural behavior and health condition of the building based on monitoring are presented in this paper.

  15. Engine health monitoring systems: Tools for improved maintenance management in the 1980's

    NASA Technical Reports Server (NTRS)

    Kimball, J. C.

    1981-01-01

    The performance monitoring aspect of maintenance, characteristic of the engine health monitoring system are discussed. An overview of the system activities is presented and a summary of programs for improved monitoring in the 1980's are discussed.

  16. ADVANCES IN GROUND WATER SAMPLING PROCEDURES

    EPA Science Inventory

    Obtaining representative ground water samples is important for site assessment and remedial performance monitoring objectives. Issues which must be considered prior to initiating a ground-water monitoring program include defining monitoring goals and objectives, sampling point...

  17. Estimating linear temporal trends from aggregated environmental monitoring data

    USGS Publications Warehouse

    Erickson, Richard A.; Gray, Brian R.; Eager, Eric A.

    2017-01-01

    Trend estimates are often used as part of environmental monitoring programs. These trends inform managers (e.g., are desired species increasing or undesired species decreasing?). Data collected from environmental monitoring programs is often aggregated (i.e., averaged), which confounds sampling and process variation. State-space models allow sampling variation and process variations to be separated. We used simulated time-series to compare linear trend estimations from three state-space models, a simple linear regression model, and an auto-regressive model. We also compared the performance of these five models to estimate trends from a long term monitoring program. We specifically estimated trends for two species of fish and four species of aquatic vegetation from the Upper Mississippi River system. We found that the simple linear regression had the best performance of all the given models because it was best able to recover parameters and had consistent numerical convergence. Conversely, the simple linear regression did the worst job estimating populations in a given year. The state-space models did not estimate trends well, but estimated population sizes best when the models converged. We found that a simple linear regression performed better than more complex autoregression and state-space models when used to analyze aggregated environmental monitoring data.

  18. Improving Inspection and Maintenance Performance and On-board Diagnostics Monitor Readiness Memo

    EPA Pesticide Factsheets

    This EPA memorandum transmits an updated list of vehicles that exhibit issues related to OBD (on board diagnostics) monitor readiness and makes suggestions for how Inspection/Maintenance (I/M) programs can improve operational performance by addressing

  19. Performance Measurement, Visualization and Modeling of Parallel and Distributed Programs

    NASA Technical Reports Server (NTRS)

    Yan, Jerry C.; Sarukkai, Sekhar R.; Mehra, Pankaj; Lum, Henry, Jr. (Technical Monitor)

    1994-01-01

    This paper presents a methodology for debugging the performance of message-passing programs on both tightly coupled and loosely coupled distributed-memory machines. The AIMS (Automated Instrumentation and Monitoring System) toolkit, a suite of software tools for measurement and analysis of performance, is introduced and its application illustrated using several benchmark programs drawn from the field of computational fluid dynamics. AIMS includes (i) Xinstrument, a powerful source-code instrumentor, which supports both Fortran77 and C as well as a number of different message-passing libraries including Intel's NX Thinking Machines' CMMD, and PVM; (ii) Monitor, a library of timestamping and trace -collection routines that run on supercomputers (such as Intel's iPSC/860, Delta, and Paragon and Thinking Machines' CM5) as well as on networks of workstations (including Convex Cluster and SparcStations connected by a LAN); (iii) Visualization Kernel, a trace-animation facility that supports source-code clickback, simultaneous visualization of computation and communication patterns, as well as analysis of data movements; (iv) Statistics Kernel, an advanced profiling facility, that associates a variety of performance data with various syntactic components of a parallel program; (v) Index Kernel, a diagnostic tool that helps pinpoint performance bottlenecks through the use of abstract indices; (vi) Modeling Kernel, a facility for automated modeling of message-passing programs that supports both simulation -based and analytical approaches to performance prediction and scalability analysis; (vii) Intrusion Compensator, a utility for recovering true performance from observed performance by removing the overheads of monitoring and their effects on the communication pattern of the program; and (viii) Compatibility Tools, that convert AIMS-generated traces into formats used by other performance-visualization tools, such as ParaGraph, Pablo, and certain AVS/Explorer modules.

  20. An International Haze-Monitoring Network for Students.

    ERIC Educational Resources Information Center

    Mims, Forrest M.

    1999-01-01

    Describes the haze-monitoring program that was added to the protocols of the Global Learning and Observations to Benefit the Environment (GLOBE) Program. Finds that sun photometry provides a convenient means for allowing students to perform hands-on science while learning about various topics in history, electronics, algebra, statistics, graphing,…

  1. 40 CFR 60.3040 - What is my schedule for evaluating continuous emission monitoring systems?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... continuous emission monitoring systems? 60.3040 Section 60.3040 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES... continuous emission monitoring systems? (a) Conduct annual evaluations of your continuous emission monitoring...

  2. 40 CFR 60.2941 - What is my schedule for evaluating continuous emission monitoring systems?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... continuous emission monitoring systems? 60.2941 Section 60.2941 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES... emission monitoring systems? (a) Conduct annual evaluations of your continuous emission monitoring systems...

  3. Measuring Cooperative Biological Engagement Program (CBEP) Performance: Capacities, Capabilities, and Sustainability Enablers for Biorisk Management and Biosurveillance

    DTIC Science & Technology

    2014-01-01

    valid OMB control number. 1. REPORT DATE 2014 2. REPORT TYPE 3. DATES COVERED 00-00-2014 to 00-00-2014 4. TITLE AND SUBTITLE Measuring...should approaches to monitoring program performance. Recognizing this, Congress requested that the Department of Defense improve metrics for measuring...Cooperative Biological Engagement Program Performance broader community of program evaluation practitioners, the work advances innovative approaches

  4. Impact of a Pharmacy-Cardiology Collaborative Practice on Dofetilide Safety Monitoring.

    PubMed

    Quffa, Lieth H; Panna, Mark; Kaufmann, Michael R; McKillop, Matthew; Dietrich, Nicole Maltese; Franck, Andrew J

    2017-01-01

    Limited studies have been published examining dofetilide's postmarketing use and its recommended monitoring. To evaluate the impact of a collaborative pharmacy-cardiology antiarrhythmic drug (AAD) monitoring program on dofetilide monitoring. This retrospective cohort study was performed to assess if a novel monitoring program improved compliance with dofetilide-specific monitoring parameters based on the Food and Drug Administration's Risk Evaluation and Mitigation Strategy. A total of 30 patients were included in the analysis. The monitoring parameters evaluated included electrocardiogram, serum potassium, serum magnesium, and kidney function. The primary outcome evaluated was the composite of these dofetilide monitoring parameters obtained in each cohort. In the standard cohort, 245 of 352 (69.6%) monitoring parameters were completed versus 134 of 136 (98.5%) in the intervention group ( P < 0.05). A collaborative pharmacy-cardiology AAD monitoring program was associated with a significant improvement in dofetilide monitoring. This improvement could potentially translate into enhanced patient safety outcomes, such as prevention of adverse drug reactions and decreased hospitalizations.

  5. Long term pavement performance program protocol for calibrating traffic data collection equipment

    DOT National Transportation Integrated Search

    1998-05-10

    This document describes the procedures that the Long Term Pavement Performance (LTPP) program recommends for ensuring that traffic data collection equipment used for LTPP traffic monitoring efforts operates correctly and collects valid data.

  6. 40 CFR 62.14453 - What must I monitor?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 9 2014-07-01 2014-07-01 false What must I monitor? 62.14453 Section 62.14453 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Performance Testing and Monitoring Requirements § 62.14453 What must I monitor? (a) If your HMIWI uses...

  7. 40 CFR 62.14453 - What must I monitor?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 9 2013-07-01 2013-07-01 false What must I monitor? 62.14453 Section 62.14453 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Performance Testing and Monitoring Requirements § 62.14453 What must I monitor? (a) If your HMIWI uses...

  8. TECHNOLOGY EVALUATION REPORT CEREX ENVIRONMENTAL SERVICES UV HOUND POINT SAMPLE AIR MONITOR

    EPA Science Inventory

    The USEPA's National Homeland Security Research Center (NHSRC) Technology Testing and Evaluation Program (TTEP) is carrying out performance tests on homeland security technologies. Under TTEP, Battelle evaluated the performance of the Cerex UV Hound point sample air monitor in de...

  9. 49 CFR 240.129 - Criteria for monitoring operational performance of certified engineers.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... certified engineers. 240.129 Section 240.129 Transportation Other Regulations Relating to Transportation... LOCOMOTIVE ENGINEERS Component Elements of the Certification Process § 240.129 Criteria for monitoring operational performance of certified engineers. (a) Each railroad's program shall include criteria and...

  10. 49 CFR 240.129 - Criteria for monitoring operational performance of certified engineers.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... certified engineers. 240.129 Section 240.129 Transportation Other Regulations Relating to Transportation... LOCOMOTIVE ENGINEERS Component Elements of the Certification Process § 240.129 Criteria for monitoring operational performance of certified engineers. (a) Each railroad's program shall include criteria and...

  11. 49 CFR 240.129 - Criteria for monitoring operational performance of certified engineers.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... certified engineers. 240.129 Section 240.129 Transportation Other Regulations Relating to Transportation... LOCOMOTIVE ENGINEERS Component Elements of the Certification Process § 240.129 Criteria for monitoring operational performance of certified engineers. (a) Each railroad's program shall include criteria and...

  12. Space radiation studies

    NASA Technical Reports Server (NTRS)

    Gregory, J. C.

    1986-01-01

    Instrument design and data analysis expertise was provided in support of several space radiation monitoring programs. The Verification of Flight Instrumentation (VFI) program at NASA included both the Active Radiation Detector (ARD) and the Nuclear Radiation Monitor (NRM). Design, partial fabrication, calibration and partial data analysis capability to the ARD program was provided, as well as detector head design and fabrication, software development and partial data analysis capability to the NRM program. The ARD flew on Spacelab-1 in 1983, performed flawlessly and was returned to MSFC after flight with unchanged calibration factors. The NRM, flown on Spacelab-2 in 1985, also performed without fault, not only recording the ambient gamma ray background on the Spacelab, but also recording radiation events of astrophysical significance.

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.; Diefenderfer, Heida L.; Ebberts, Blaine D.

    The purpose ofthis document is to describe research, monitoring, and evaluation (RME) for the Federal Columbia River Estuary Program. The intent of this RME effort is to provide data and information to evaluate progress toward meeting program goals and objectives and support decision-making in the Estuary Program. The goal of the Estuary Program is to understand, conserve, and restore the estuary ecosystem to improve the performance of listed salmonid populations. The Estuary Program has five general objectives, designed to fulfill the program goal, as follows. 1. Understand the primary stressors affecting ecosystem controlling factors, such as ocean conditions and invasivemore » species. 2. Conserve and restore factors controlling ecosystem structures and processes, such as hydrodynamics and water quality. 3. Increase the quantity and quality of ecosystem structures, i.e., habitats, juvenile salmonids use during migration through the estuary. 4. Maintain the food web to benefit salmonid performance. 5. Improve salmonid performance in terms of life history diversity, foraging success, growth, and survival. The goal of estuary RME is to provide pertinent and timely research and monitoring information to planners, implementers, and managers of the Estuary Program. In conclusion, the estuary RME effort is designed to meet the research and monitoring needs of the estuary Program using an adaptive management process. Estuary RME's success and usefulness will depend on the actual conduct of adaptive management, as embodied in the objectives, implrementation, data, reporting, and synthesis, evaluation, and decision-making described herein.« less

  14. Flight Test of Propulsion Monitoring and Diagnostic System

    NASA Technical Reports Server (NTRS)

    Gabel, Steve; Elgersma, Mike

    2002-01-01

    The objective of this program was to perform flight tests of the propulsion monitoring and diagnostic system (PMDS) technology concept developed by Honeywell under the NASA Advanced General Aviation Transport Experiment (AGATE) program. The PMDS concept is intended to independently monitor the performance of the engine, providing continuous status to the pilot along with warnings if necessary as well as making the data available to ground maintenance personnel via a special interface. These flight tests were intended to demonstrate the ability of the PMDS concept to detect a class of selected sensor hardware failures, and the ability to successfully model the engine for the purpose of engine diagnosis.

  15. 24 CFR 84.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... programs or projects can be readily quantified, such quantitative data should be related to cost data for... information including, when appropriate, analysis and explanation of cost overruns or high unit costs. (e... when requesting performance data from recipients. ...

  16. Annual Performance Report. 2002-2003. Wyoming Department of Education.

    ERIC Educational Resources Information Center

    Wyoming State Department of Education, 2004

    2004-01-01

    Wyoming's Department of Education (WDE?s) Special Programs Unit conducts compliance monitoring for all IDEA procedural requirements on a five-year cycle. The current process began for Wyoming?s school districts in 1999-2000 and will be completed in 2004-05. The special education monitoring process is a comprehensive program review. The process…

  17. 10 CFR 600.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., program, subaward, function or activity supported by the award. Recipients shall monitor subawards to... overruns or high unit costs. DOE may specify in the award that the recipient provide this information on... § 600.112 with regard to use of this form as part of the award application.) (e) Recipients shall not be...

  18. 10 CFR 600.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., program, subaward, function or activity supported by the award. Recipients shall monitor subawards to... overruns or high unit costs. DOE may specify in the award that the recipient provide this information on... § 600.112 with regard to use of this form as part of the award application.) (e) Recipients shall not be...

  19. 10 CFR 600.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., program, subaward, function or activity supported by the award. Recipients shall monitor subawards to... overruns or high unit costs. DOE may specify in the award that the recipient provide this information on... § 600.112 with regard to use of this form as part of the award application.) (e) Recipients shall not be...

  20. 10 CFR 600.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., program, subaward, function or activity supported by the award. Recipients shall monitor subawards to... overruns or high unit costs. DOE may specify in the award that the recipient provide this information on... § 600.112 with regard to use of this form as part of the award application.) (e) Recipients shall not be...

  1. The Dams and Monitoring Systems and Case Study: Ataturk and Karakaya Dams

    NASA Astrophysics Data System (ADS)

    Kalkan, Y.; Bilgi, S.; Gülnerman, A. G.

    2017-12-01

    Dams are among the most important engineering structures used for flood controls, agricultural purposes as well as drinking and hydroelectric power. Especially after the Second World War, developments on the construction technology, increase the construction of larger capacity dams. There are more than 150.000 dams in the world and almost 1000 dams in Turkey, according to international criteria. Although dams provide benefits to humans, they possess structural risks too. To determine the performance of dams on structural safety, assessing the spatial data is very important. These are movement, water pressure, seepage, reservoir and tail-water elevations, local seismic activities, total pressure, stress and strain, internal concrete temperature, ambient temperature and precipitation. These physical data are measured and monitored by the instruments and equipment. Dams and their surroundings have to be monitored by using essential methods at periodic time intervals in order to determine the possible changes that may occur over the time. Monitoring programs typically consist of; surveillance or visual observation. These programs on dams provide information for evaluating the dam's performance related to the design intent and expected changes that could affect the safety performance of the dam. Additionally, these programs are used for investigating and evaluating the abnormal or degrading performance where any remedial action is necessary. Geodetic and non-geodetic methods are used for monitoring. Monitoring the performance of the dams is critical for producing and maintaining the safe dams. This study provides some general information on dams and their different monitoring systems by taking into account two different dams and their structural specifications with the required information. The case study in this paper depends on a comparison of the monitoring surveys on Atatürk Dam and Karakaya Dam, which are constructed on Firat River with two different structural type in Turkey. In addition, brief information is given about these dams and the methods of geodetic and non-geodetic monitoring measurements applied by various disciplines. The last part of the study focuses on the inference of the geodetic monitoring methods, which depend on a seven years of geodetic monitoring.

  2. Hybrid Modeling Improves Health and Performance Monitoring

    NASA Technical Reports Server (NTRS)

    2007-01-01

    Scientific Monitoring Inc. was awarded a Phase I Small Business Innovation Research (SBIR) project by NASA's Dryden Flight Research Center to create a new, simplified health-monitoring approach for flight vehicles and flight equipment. The project developed a hybrid physical model concept that provided a structured approach to simplifying complex design models for use in health monitoring, allowing the output or performance of the equipment to be compared to what the design models predicted, so that deterioration or impending failure could be detected before there would be an impact on the equipment's operational capability. Based on the original modeling technology, Scientific Monitoring released I-Trend, a commercial health- and performance-monitoring software product named for its intelligent trending, diagnostics, and prognostics capabilities, as part of the company's complete ICEMS (Intelligent Condition-based Equipment Management System) suite of monitoring and advanced alerting software. I-Trend uses the hybrid physical model to better characterize the nature of health or performance alarms that result in "no fault found" false alarms. Additionally, the use of physical principles helps I-Trend identify problems sooner. I-Trend technology is currently in use in several commercial aviation programs, and the U.S. Air Force recently tapped Scientific Monitoring to develop next-generation engine health-management software for monitoring its fleet of jet engines. Scientific Monitoring has continued the original NASA work, this time under a Phase III SBIR contract with a joint NASA-Pratt & Whitney aviation security program on propulsion-controlled aircraft under missile-damaged aircraft conditions.

  3. 40 CFR 60.1250 - What is my schedule for evaluating continuous emission monitoring systems?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... continuous emission monitoring systems? 60.1250 Section 60.1250 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Small Municipal Waste Combustion Units for Which Construction is Commenced...

  4. 32 CFR 34.41 - Monitoring and reporting program and financial performance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... performance. 34.41 Section 34.41 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD... and business status, as follows: (1) The program portions of the reports must address progress toward... program progress reported in the periodic report, in relation to reported expenditures, is sufficient to...

  5. 32 CFR 34.41 - Monitoring and reporting program and financial performance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... performance. 34.41 Section 34.41 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD... and business status, as follows: (1) The program portions of the reports must address progress toward... program progress reported in the periodic report, in relation to reported expenditures, is sufficient to...

  6. 32 CFR 34.41 - Monitoring and reporting program and financial performance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... performance. 34.41 Section 34.41 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD... and business status, as follows: (1) The program portions of the reports must address progress toward... program progress reported in the periodic report, in relation to reported expenditures, is sufficient to...

  7. 32 CFR 34.41 - Monitoring and reporting program and financial performance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... performance. 34.41 Section 34.41 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD... and business status, as follows: (1) The program portions of the reports must address progress toward... program progress reported in the periodic report, in relation to reported expenditures, is sufficient to...

  8. Global Positioning System (GPS) civil signal monitoring (CSM) trade study report

    DOT National Transportation Integrated Search

    2014-03-07

    This GPS Civil Signal Monitoring (CSM) Trade Study has been performed at the direction of DOT/FAA Navigation Programs as the agency of reference for consolidating civil monitoring requirements on the Global Positioning System (GPS). The objective of ...

  9. Personnel Radiation Exposure Associated With X-Rays Emanating from U.S. Coast Guard LORAN High Voltage Vacuum Tube Transmitter Units

    DTIC Science & Technology

    2011-07-01

    dosimeter program. Unfortunately, this limited personnel monitoring program did not address the case of an individual who may have performed...and forearms; feet and ankles 18 ¾ Skin of whole body 7 ½ The USCG does maintain a small radiation personnel dosimeter monitoring program for x...ray technicians at USCG medical clinics (USCG, 2006). This medical clinic dosimeter program reflects a civilian standard of practice, where the x-ray

  10. In Vivo Monitoring Program Manual, PNL-MA-574

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynch, Timothy P.

    2010-07-01

    An overview of the administration for the In Vivo Monitoring Program (IVMP) for Hanford. This includes organizational structure and program responsibilities; coordination of in vivo measurements; scheduling measurements; performing measurements; reporting results; and quality assurance. Overall responsibility for the management of the IVMP rests with the Program Manager (PM). The PM is responsible for providing the required in vivo counting services for Hanford Site contractor employees in accordance with Department of Energy (DOE) requirements and the specific statements of work.

  11. 75 FR 42760 - Statement of Organization, Functions, and Delegations of Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... accounting reports and invoices, and monitoring all spending. The Team develops, defends and executes the... results; performance measurement; research and evaluation methodologies; demonstration testing and model... ACF programs; strategic planning; performance measurement; program and policy evaluation; research and...

  12. PERFORMANCE VERIFICATION TEST FOR FIELD-PORTABLE MEASUREMENTS OF LEAD IN DUST

    EPA Science Inventory

    The US Environmental Protection Agency (EPA) Environmental Technology Verification (ETV) program (www.epa.jzov/etv) conducts performance verification tests of technologies used for the characterization and monitoring of contaminated media. The program exists to provide high-quali...

  13. SUPERFUND INNOVATIVE TECHNOLOGIES EVALUATION ...

    EPA Pesticide Factsheets

    This task seeks to identify high priority needs of the Regions and Program Offices for innovative field sampling, characterization, monitoring, and measurement technologies. When an appropriate solution to a specific problem is identified, a field demonstration is conducted to document the performance and cost of the proposed technologies. The use of field analysis almost always provides a savings in time and cost over the usual sample and ship to a conventional laboratory for analysis approach to site characterization and monitoring. With improvements in technology and appropriate quality assurance/quality control, field analysis has been shown to provide high quality data, useful for most environmental monitoring or characterization projects. An emphasis of the program is to seek out innovative solutions to existing problems and to provide the cost and performance data a user would require to make an informed decision regarding the adequacy of a technology to address a specific environmental problem. The objective of this program is to promote the acceptance and use of innovative field technologies by providing well-documented performance and cost data obtained from field demonstrations.

  14. 40 CFR Appendix B to Part 60 - Performance Specifications

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... manufacturers comply with a comprehensive series of design and performance specifications and test procedures to... must periodically select and test an opacity monitor, that is representative of a group of monitors... program are used. One Run may include results for more than one test condition. Constant emissions means...

  15. 40 CFR Appendix B to Part 60 - Performance Specifications

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... manufacturers comply with a comprehensive series of design and performance specifications and test procedures to... must periodically select and test an opacity monitor, that is representative of a group of monitors... program are used. One Run may include results for more than one test condition. Constant emissions means...

  16. 40 CFR Appendix B to Part 60 - Performance Specifications

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... manufacturers comply with a comprehensive series of design and performance specifications and test procedures to... must periodically select and test an opacity monitor, that is representative of a group of monitors... program are used. One Run may include results for more than one test condition. Constant emissions means...

  17. 7 CFR 3015.91 - Monitoring by recipients.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Monitoring by recipients. 3015.91 Section 3015.91 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF THE CHIEF FINANCIAL OFFICER, DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Monitoring and Reporting Program Performance...

  18. Improving Ecological Response Monitoring of Environmental Flows

    NASA Astrophysics Data System (ADS)

    King, Alison J.; Gawne, Ben; Beesley, Leah; Koehn, John D.; Nielsen, Daryl L.; Price, Amina

    2015-05-01

    Environmental flows are now an important restoration technique in flow-degraded rivers, and with the increasing public scrutiny of their effectiveness and value, the importance of undertaking scientifically robust monitoring is now even more critical. Many existing environmental flow monitoring programs have poorly defined objectives, nonjustified indicator choices, weak experimental designs, poor statistical strength, and often focus on outcomes from a single event. These negative attributes make them difficult to learn from. We provide practical recommendations that aim to improve the performance, scientific robustness, and defensibility of environmental flow monitoring programs. We draw on the literature and knowledge gained from working with stakeholders and managers to design, implement, and monitor a range of environmental flow types. We recommend that (1) environmental flow monitoring programs should be implemented within an adaptive management framework; (2) objectives of environmental flow programs should be well defined, attainable, and based on an agreed conceptual understanding of the system; (3) program and intervention targets should be attainable, measurable, and inform program objectives; (4) intervention monitoring programs should improve our understanding of flow-ecological responses and related conceptual models; (5) indicator selection should be based on conceptual models, objectives, and prioritization approaches; (6) appropriate monitoring designs and statistical tools should be used to measure and determine ecological response; (7) responses should be measured within timeframes that are relevant to the indicator(s); (8) watering events should be treated as replicates of a larger experiment; (9) environmental flow outcomes should be reported using a standard suite of metadata. Incorporating these attributes into future monitoring programs should ensure their outcomes are transferable and measured with high scientific credibility.

  19. 40 CFR 60.2730 - What monitoring equipment must I install and what parameters must I monitor?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY... Units Model Rule-Monitoring § 60.2730 What monitoring equipment must I install and what parameters must...) of this section must be expressed in milligrams per dry standard cubic meter corrected to 7 percent...

  20. 40 CFR 60.2730 - What monitoring equipment must I install and what parameters must I monitor?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY... Units Model Rule-Monitoring § 60.2730 What monitoring equipment must I install and what parameters must...) of this section must be expressed in milligrams per dry standard cubic meter corrected to 7 percent...

  1. Knowledge-Acquisition Tool For Expert System

    NASA Technical Reports Server (NTRS)

    Disbrow, James D.; Duke, Eugene L.; Regenie, Victoria A.

    1988-01-01

    Digital flight-control systems monitored by computer program that evaluates and recommends. Flight-systems engineers for advanced, high-performance aircraft use knowlege-acquisition tool for expert-system flight-status monitor suppling interpretative data. Interpretative function especially important in time-critical, high-stress situations because it facilitates problem identification and corrective strategy. Conditions evaluated and recommendations made by ground-based engineers having essential knowledge for analysis and monitoring of performances of advanced aircraft systems.

  2. Performance Confirmation Data Aquisition System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D.W. Markman

    2000-10-27

    The purpose of this analysis is to identify and analyze concepts for the acquisition of data in support of the Performance Confirmation (PC) program at the potential subsurface nuclear waste repository at Yucca Mountain. The scope and primary objectives of this analysis are to: (1) Review the criteria for design as presented in the Performance Confirmation Data Acquisition/Monitoring System Description Document, by way of the Input Transmittal, Performance Confirmation Input Criteria (CRWMS M&O 1999c). (2) Identify and describe existing and potential new trends in data acquisition system software and hardware that would support the PC plan. The data acquisition softwaremore » and hardware will support the field instruments and equipment that will be installed for the observation and perimeter drift borehole monitoring, and in-situ monitoring within the emplacement drifts. The exhaust air monitoring requirements will be supported by a data communication network interface with the ventilation monitoring system database. (3) Identify the concepts and features that a data acquisition system should have in order to support the PC process and its activities. (4) Based on PC monitoring needs and available technologies, further develop concepts of a potential data acquisition system network in support of the PC program and the Site Recommendation and License Application.« less

  3. Biomedical Monitoring and Countermeasures Facility

    NASA Technical Reports Server (NTRS)

    Stewart, Donald F.

    1992-01-01

    The Space Station Freedom Program (SSFP) represents the transition within the US Space program from the 'heroic' era of space flight (characterized most vividly by the Mercury and Apollo programs) to an epoch characterized by routine access to the space environment. In this new era, the unique characteristics of the microgravity environment will enable new types of research activities, primarily in the life sciences, materials science, and biotechnology fields. In addition to its role as a'microgravity science laboratory,' Space Station Freedom (SSF) constitutes the operational platform on which the knowledge and skills needed to continue our exploration of space will be acquired. In the area of spacecraft operations, these skills include the ability to assemble, operate, and maintain large structures in space. In the area of crew operations, the potentially harmful effects of extended exposure to microgravity must be understood in order to keep the crew mission capable. To achieve this goal, the complex process of physiological deconditioning must be monitored, and countermeasures utilized as needed to keep the individual crew members within acceptable physiological limits. The countermeasures program under development for the SSF Program is titled the Biomedical Monitoring and Countermeasures (BMAC) program. As implied by the name, this activity has two primary products, a biomedical monitoring element and a countermeasures development effort. The program is a critical path element in the overall SSF Program, and should be considered an essential element of operations on board the space station. It is readily apparent that the capability to both protect and optimize the health and performance of the human operators on board SSF will be a critical element in the overall success of the SSFP. Previous experience within the Russian space program has demonstrated that the time required for countermeasures on extended missions can become a monumental operational burden. Therefore, one of the primary objectives of the countermeasures development activity will be to design and implement countermeasures which are significantly more effective than the existing generation. Other primary objectives include the following: to set health and human performance standards for all mission phases; to determine critical issues that affect performance or return to flight status; to develop and implement monitoring systems to follow health and performance status; and to understand risk, and balance the resource costs of countermeasures vs. the benefit gained.

  4. 34 CFR 200.88 - Exclusion of supplemental State and local funds from supplement, not supplant and comparability...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., the SEA must make an advance written determination that the program meets the intent and purposes of... migratory children, as defined in section 1309 of the ESEA. (2) The program is based on performance targets... these requirements. (4) The grantee monitors program performance to ensure that these requirements are...

  5. 34 CFR 200.88 - Exclusion of supplemental State and local funds from supplement, not supplant and comparability...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... EDUCATION TITLE I-IMPROVING THE ACADEMIC ACHIEVEMENT OF THE DISADVANTAGED Migrant Education Program § 200.88... migratory children, as defined in section 1309 of the ESEA. (2) The program is based on performance targets... these requirements. (4) The grantee monitors program performance to ensure that these requirements are...

  6. 40 CFR 60.1740 - What is my schedule for evaluating continuous emission monitoring systems?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... continuous emission monitoring systems? 60.1740 Section 60.1740 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES... evaluating continuous emission monitoring systems? (a) Conduct annual evaluations of your continuous emission...

  7. Y-12 Groundwater Protection Program Groundwater and Surface Water Sampling and Analysis Plan for Calendar Year 2004

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elvado Environmental LLC for the Environmental Compliance Department ES&H Division, Y-12 National Security Complex Oak Ridge, Tennessee

    2003-09-30

    This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2004 at the U.S. Department of Energy (DOE) Y-12 National Security Complex that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2004 will be in accordance with the following requirements of DOE Order 5400.1: (1) to maintain surveillance of existing and potential groundwater contamination sources; (2) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminants are mostmore » likely to migrate beyond the Oak Ridge Reservation property line; (3) to identify and characterize long-term trends in groundwater quality at Y-12; and (4) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2004 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation (Figure A.1). Modifications to the CY 2004 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells, or wells could be added or removed from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan.« less

  8. Y-12 Groundwater Protection Program Groundwater and Surface Water Sampling and Analysis Plan for Calendar Year 2005

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2004-09-30

    This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2005 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2005 will be in accordance with DOE Order 540.1 requirements and the following goals: (1) to maintain surveillance of existing and potential groundwater contamination sources; (2) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminantsmore » are most likely to migrate beyond the Oak Ridge Reservation property line; (3) to identify and characterize long-term trends in groundwater quality at Y-12; and (4) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2005 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation (Figure A.1). Modifications to the CY 2005 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan.« less

  9. Shared performance monitor in a multiprocessor system

    DOEpatents

    Chiu, George; Gara, Alan G.; Salapura, Valentina

    2012-07-24

    A performance monitoring unit (PMU) and method for monitoring performance of events occurring in a multiprocessor system. The multiprocessor system comprises a plurality of processor devices units, each processor device for generating signals representing occurrences of events in the processor device, and, a single shared counter resource for performance monitoring. The performance monitor unit is shared by all processor cores in the multiprocessor system. The PMU comprises: a plurality of performance counters each for counting signals representing occurrences of events from one or more the plurality of processor units in the multiprocessor system; and, a plurality of input devices for receiving the event signals from one or more processor devices of the plurality of processor units, the plurality of input devices programmable to select event signals for receipt by one or more of the plurality of performance counters for counting, wherein the PMU is shared between multiple processing units, or within a group of processors in the multiprocessing system. The PMU is further programmed to monitor event signals issued from non-processor devices.

  10. Real-Time Monitoring of Results During First Year of Dutch Colorectal Cancer Screening Program and Optimization by Altering Fecal Immunochemical Test Cut-Off Levels.

    PubMed

    Toes-Zoutendijk, Esther; van Leerdam, Monique E; Dekker, Evelien; van Hees, Frank; Penning, Corine; Nagtegaal, Iris; van der Meulen, Miriam P; van Vuuren, Anneke J; Kuipers, Ernst J; Bonfrer, Johannes M G; Biermann, Katharina; Thomeer, Maarten G J; van Veldhuizen, Harriët; Kroep, Sonja; van Ballegooijen, Marjolein; Meijer, Gerrit A; de Koning, Harry J; Spaander, Manon C W; Lansdorp-Vogelaar, Iris

    2017-03-01

    After careful pilot studies and planning, the national screening program for colorectal cancer (CRC), with biennial fecal immunochemical tests (FITs), was initiated in The Netherlands in 2014. A national information system for real-time monitoring was developed to allow for timely evaluation. Data were collected from the first year of this screening program to determine the importance of planning and monitoring for optimal screening program performance. The national information system of the CRC screening program kept track of the number of invitations sent in 2014, FIT kits returned, and colonoscopies performed. Age-adjusted rates of participation, the number of positive test results, and positive predictive values (PPVs) for advanced neoplasia were determined weekly, quarterly, and yearly. In 2014, there were 741,914 persons invited for FIT; of these, 529,056 (71.3%; 95% CI, 71.2%-71.4%) participated. A few months into the program, real-time monitoring showed that rates of participation and positive test results (10.6%; 95% CI, 10.5%-10.8%) were higher than predicted and the PPV was lower (42.1%; 95% CI, 41.3%-42.9%) than predicted based on pilot studies. To reduce the burden of unnecessary colonoscopies and alleviate colonoscopy capacity, the cut-off level for a positive FIT result was increased from 15 to 47 μg Hb/g feces halfway through 2014. This adjustment decreased the percentage of positive test results to 6.7% (95% CI, 6.6%-6.8%) and increased the PPV to 49.1% (95% CI, 48.3%-49.9%). In total, the first year of the Dutch screening program resulted in the detection of 2483 cancers and 12,030 advanced adenomas. Close monitoring of the implementation of the Dutch national CRC screening program allowed for instant adjustment of the FIT cut-off levels to optimize program performance. Copyright © 2017 AGA Institute. Published by Elsevier Inc. All rights reserved.

  11. 40 CFR 1.49 - Office of Water.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... programs, is responsible for management of EPA's water programs. Functions of the Office include program... assistance to the regional activities in both enforcement and permitting programs. (b) Office of Water... for monitoring and evaluating the performance, progress, and fiscal status of the organization in...

  12. 40 CFR 1.49 - Office of Water.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... programs, is responsible for management of EPA's water programs. Functions of the Office include program... assistance to the regional activities in both enforcement and permitting programs. (b) Office of Water... for monitoring and evaluating the performance, progress, and fiscal status of the organization in...

  13. 2 CFR 215.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., subaward, function or activity supported by the award. Recipients shall monitor subawards to ensure...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... ORGANIZATIONS (OMB CIRCULAR A-110) Post Award Requirements Reports and Records § 215.51 Monitoring and reporting...

  14. 2 CFR 215.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., subaward, function or activity supported by the award. Recipients shall monitor subawards to ensure...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... ORGANIZATIONS (OMB CIRCULAR A-110) Post Award Requirements Reports and Records § 215.51 Monitoring and reporting...

  15. 2 CFR 215.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., subaward, function or activity supported by the award. Recipients shall monitor subawards to ensure...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... ORGANIZATIONS (OMB CIRCULAR A-110) Post Award Requirements Reports and Records § 215.51 Monitoring and reporting...

  16. Chapter 11: Monitoring and Assessment of Wetlands: Concepts, Case Studies, and Lessons Learned

    EPA Science Inventory

    Monitoring and assessment (M&A) have long been considered critical components of any resource management program where there is a need to evaluate progress and performance over time. Understanding the origins of current monitoring and assessment strategies and techniques for wetl...

  17. Using Curriculum Based Measures To Identify and Monitor Progress in an Adult Basic Education Program. Final Report.

    ERIC Educational Resources Information Center

    Bean, Rita M.; And Others

    The purpose of a project was to develop and test curriculum-based procedures and measures to monitor and assess the reading and writing progress of adults in a basic education program. The most efficient, reliable, and feasible measure of reading performance from beginning reading level through eighth-grade level was the repeated oral reading…

  18. Evaluation of a training program for nurse supervisors who monitor nurses in an alternative-to-discipline program.

    PubMed

    Cadiz, David; Truxillo, Donald; OʼNeill, Chris

    2012-01-01

    Nurse alternative-to-discipline programs aim to protect the public from the harm of impaired practice and to support nurses in early recovery from substance use disorders. Supervisor observation of work behavior is one key monitoring activity that protects the public. We evaluate a supervisory training called "Fit to Perform" for nurse managers to help them monitor and manage nurses enrolled in an alternative-to-discipline program. We observed significant mean changes in knowledge, training utility, self-efficacy, and substance abuse stigma. The results suggest that the training positively affects knowledge about substance use disorders, confidence to supervise nurses enrolled in an alternative-to-discipline program, and reduces stigma, which may create a supportive workplace for nurses in recovery.

  19. A Rod Ricochet Model

    DTIC Science & Technology

    2004-08-01

    PROGRAM ELEMENT NUMBER 5d. PROJECT NUMBER AH80 5e. TASK NUMBER 6. AUTHOR( S ) Steven B. Segletes 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION...NAME( S ) AND ADDRESS(ES) U.S. Army Research Laboratory ATTN: AMSRD-ARL-WM-TD Aberdeen Proving Ground, MD 21005-5066 8. PERFORMING ORGANIZATION...REPORT NUMBER ARL-TR-3257 10. SPONSOR/MONITOR’S ACRONYM( S ) 9. SPONSORING/MONITORING AGENCY NAME( S ) AND ADDRESS(ES) 11. SPONSOR/MONITOR’S

  20. Increasing Capacity & Changing the Culture: Volunteer Management in Law Enforcement

    DTIC Science & Technology

    2009-03-01

    6. AUTHOR(S) Donna Cayson 5. FUNDING NUMBERS 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Naval Postgraduate School Monterey, CA 93943...5000 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING /MONITORING AGENCY NAME(S) AND ADDRESS(ES) N/A 10. SPONSORING/MONITORING...mission performance in a law enforcement agency’s volunteer program? Furthermore, the research will address the role of volunteers in law enforcement

  1. ATS-6 engineering performance report. Volume:Program and systems summaries: Mechanical and thermal details

    NASA Technical Reports Server (NTRS)

    Wales, R. O. (Editor)

    1981-01-01

    The overall mission and spacecraft systems, testing, and operations are summarized. The mechanical subsystems are reviewed, encompassing mechanical design requirements; separation and deployment mechanisms; design and performance evaluation; and the television camera reflector monitor. Thermal control and contamination are discussed in terms of thermal control subsystems, design validation, subsystems performance, the advanced flight experiment, and the quartz-crystal microbalance contamination monitor.

  2. Assessment without Testing: Using Performance Measures Embedded in a Technology-Based Instructional Program as Indicators of Reading Ability

    ERIC Educational Resources Information Center

    Mitchell, Alison; Baron, Lauren; Macaruso, Paul

    2018-01-01

    Screening and monitoring student reading progress can be costly and time consuming. Assessment embedded within the context of online instructional programs can capture ongoing student performance data while limiting testing time outside of instruction. This paper presents two studies that examined the validity of using performance measures from a…

  3. Covenants with Weak Swords: ISO 14001 and Facilities' Environmental Performance

    ERIC Educational Resources Information Center

    Potoski, Matthew; Prakash, Aseem

    2005-01-01

    Voluntary environmental programs are codes of progressive environmental conduct that firms pledge to adopt. This paper investigates whether ISO 14001, a voluntary program with a weak sword--a weak monitoring and sanctioning mechanism--can mitigate shirking and improve participants' environmental performance. Sponsored by the International…

  4. [Electronic fetal monitoring and management of adverse outcomes: how to perform and improve a training program for clinicians?].

    PubMed

    Secourgeon, J-F

    2012-10-01

    Electronic fetal monitoring during labor is the most commonly used method to evaluate the fetal status, but it remains exposed to some criticism. By comparison with intermittent auscultation and in the light of the results of the great studies in the last 30 years, it may be accused its failure to improve the neonatal outcome and its responsibility in the increase on operative deliveries. Actually, the electronic fetal monitoring is a tool whose effectiveness is linked to the accuracy of the analysis developed by the clinician. Studies on assessment of the tracing interpretation indicate that there is always a lack of quality, which may be improved through training programs. It also reveals the benefit of the fetal blood sampling to reduce operative deliveries and the generalization of this method, in addition to electronic fetal monitoring, is recommended by referral agencies. More generally, the continuous monitoring is only a part of the patient safety strategy in the labour ward and we are currently observing, in some European countries and in the United States, the development of training programs concerning the management of the adverse outcomes in obstetrics. The good performances related to the quality of care are demonstrated by the findings of the studies performed in the centers that have implemented an active training policy. In France, the professionals directly involved in the field of the perinatology should benefit from such educational programs that could be organized within the care networks under the authority of referral agencies. Copyright © 2012 Elsevier Masson SAS. All rights reserved.

  5. ENVIRONMENTAL TECHNOLOGY VERIFICATION (ETV) PROGRAM CASE STUDIES: DEMONSTRATING PROGRAM OUTCOMES

    EPA Science Inventory

    The U.S. Environmental Protection Agency (EPA) Environmental Technology Verification (ETV) Program evaluates the performance of innovative air, water, pollution prevention and monitoring technologies that have the potential to improve human health and the environment. This bookle...

  6. Medicaid.gov

    MedlinePlus

    ... Monitoring Review Plans Program Integrity National Correct Coding Initiative Affordable Care Act Program Integrity Provisions Cost Sharing ... to Care Living Well Quality of Care Improvement Initiatives Medicaid Managed Care Performance Measurement Releases & Announcements Enrollment ...

  7. Medicaid Benefits

    MedlinePlus

    ... Monitoring Review Plans Program Integrity National Correct Coding Initiative Affordable Care Act Program Integrity Provisions Cost Sharing ... to Care Living Well Quality of Care Improvement Initiatives Medicaid Managed Care Performance Measurement Releases & Announcements Enrollment ...

  8. 34 CFR 74.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... programs or projects can be readily quantified, this quantitative data should be related to cost data for... information including, when appropriate, analysis, and explanation of cost overruns or high unit costs. (e... requirements of 5 CFR part 1320 when requesting performance data from recipients. (Approved by the Office of...

  9. 7 CFR 215.11 - Special responsibilities of State agencies.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL MILK PROGRAM FOR CHILDREN § 215.11... managerial personnel to administer the Program and monitor performance of schools and child-care institutions and to measure progress toward achieving Program goals. (2) Visits to participating schools and child...

  10. 7 CFR 275.19 - Monitoring and evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM PERFORMANCE REPORTING SYSTEM Corrective Action § 275.19... data available through program management tools and other sources. (c) In instances where the State...

  11. 7 CFR 275.19 - Monitoring and evaluation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM PERFORMANCE REPORTING SYSTEM Corrective Action § 275.19... data available through program management tools and other sources. (c) In instances where the State...

  12. 7 CFR 275.19 - Monitoring and evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM PERFORMANCE REPORTING SYSTEM Corrective Action § 275.19... data available through program management tools and other sources. (c) In instances where the State...

  13. 7 CFR 275.19 - Monitoring and evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM PERFORMANCE REPORTING SYSTEM Corrective Action § 275.19... data available through program management tools and other sources. (c) In instances where the State...

  14. 20 CFR 632.253 - Special operating provisions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... appropriate efforts to encourage educational agencies and post-secondary institutions to award academic credit... appropriate efforts are made to closely monitor the performance of the summer program and measure program...

  15. 40 CFR 60.1330 - How do I monitor the injection rate of activated carbon?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false How do I monitor the injection rate of activated carbon? 60.1330 Section 60.1330 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Small Municipal Waste Combustio...

  16. 40 CFR 60.1330 - How do I monitor the injection rate of activated carbon?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false How do I monitor the injection rate of activated carbon? 60.1330 Section 60.1330 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Small Municipal Waste Combustio...

  17. 40 CFR 60.1330 - How do I monitor the injection rate of activated carbon?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false How do I monitor the injection rate of activated carbon? 60.1330 Section 60.1330 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Small Municipal Waste Combustio...

  18. 40 CFR 60.2255 - How must I monitor opacity for air curtain incinerators?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false How must I monitor opacity for air curtain incinerators? 60.2255 Section 60.2255 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Commercial and Industrial Solid...

  19. 40 CFR 60.2255 - How must I monitor opacity for air curtain incinerators?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false How must I monitor opacity for air curtain incinerators? 60.2255 Section 60.2255 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Commercial and Industrial Solid...

  20. 40 CFR 60.1330 - How do I monitor the injection rate of activated carbon?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false How do I monitor the injection rate of activated carbon? 60.1330 Section 60.1330 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Small Municipal Waste Combustio...

  1. 40 CFR Appendix A to Part 58 - Quality Assurance Requirements for SLAMS, SPMs and PSD Air Monitoring

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... monitor. 3.3.4.4Pb Performance Evaluation Program (PEP) Procedures. Each year, one performance evaluation... Information 2. Quality System Requirements 3. Measurement Quality Check Requirements 4. Calculations for Data... 10 of this appendix) and at a national level in references 1, 2, and 3 of this appendix. 1...

  2. 40 CFR Appendix A to Part 58 - Quality Assurance Requirements for SLAMS, SPMs and PSD Air Monitoring

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... monitor. 3.3.4.4Pb Performance Evaluation Program (PEP) Procedures. Each year, one performance evaluation... Information 2. Quality System Requirements 3. Measurement Quality Check Requirements 4. Calculations for Data... 10 of this appendix) and at a national level in references 1, 2, and 3 of this appendix. 1...

  3. 24 CFR 570.405 - The insular areas.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...) Threshold requirements. HUD shall review each grantee's progress on outstanding grants made under this..., HUD will consider program achievements and the applicant's effectiveness in using program funds. Effectiveness in using program funds shall be measured by reviewing audit, monitoring and performance reports...

  4. ENVIRONMENTAL TECHNOLOGY VERIFICATION (ETV) PROGRAM CASE STUDIES: DEMONSTRATING PROGRAM OUTCOMES, VOLUME II

    EPA Science Inventory

    The U.S. Environmental Protection Agency (EPA) Environmental Technology Verification (ETV) Program evaluates the performance of innovative air, water, pollution prevention and monitoring technologies that have the potential to improve human health and the environment. This bookle...

  5. Environmental Technology Verification Program - ETV - Case Studies: Demonstrating Program Outcomes

    EPA Science Inventory

    The U.S. Environmental Protection Agency (EPA) Environmental Technology Verification (ETV) Program evaluates the performance of innovative air, water, pollution prevention and monitoring technologies that have the potential to improve human health and the environment. This cd con...

  6. Automatized Photometric Monitoring of Active Galactic Nuclei with the 46cm Telescope of the Wise Observatory

    NASA Astrophysics Data System (ADS)

    Pozo Nuñez, Francisco; Chelouche, Doron; Kaspi, Shai; Niv, Saar

    2017-09-01

    We present the first results of an ongoing variability monitoring program of active galactic nuclei (AGNs) using the 46 cm telescope of the Wise Observatory in Israel. The telescope has a field of view of 1.25^\\circ × 0.84^\\circ and is specially equipped with five narrowband filters at 4300, 5200, 5700, 6200, and 7000 Å to perform photometric reverberation mapping studies of the central engine of AGNs. The program aims to observe a sample of 27 AGNs (V < 17 mag) selected according to tentative continuum and line time delay measurements obtained in previous works. We describe the autonomous operation of the telescope together with the fully automatic pipeline used to achieve high-performance unassisted observations, data reduction, and light curves extraction using different photometric methods. The science verification data presented here demonstrates the performance of the monitoring program in particular for efficiently photometric reverberation mapping of AGNs with additional capabilities to carry out complementary studies of other transient and variable phenomena such as variable stars studies.

  7. Executive Development Programs in the U.S. Air Force: Does Diversity Matter?

    DTIC Science & Technology

    2000-04-01

    PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME AND ADDRESS Air Command and Staff College Maxwell Air Force Base...AL36112 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME AND ADDRESS , 10. SPONSOR/MONITOR’S ACRONYM(S) 11. SPONSOR/MONITOR’S...leadership positions to the organization?s members who have diverse backgrounds (ethnic, religious or gender ), engendering a stronger work effort

  8. GPS Monitor Station Upgrade Program at the Naval Research Laboratory

    NASA Technical Reports Server (NTRS)

    Galysh, Ivan J.; Craig, Dwin M.

    1996-01-01

    One of the measurements made by the Global Positioning System (GPS) monitor stations is to measure the continuous pseudo-range of all the passing GPS satellites. The pseudo-range contains GPS and monitor station clock errors as well as GPS satellite navigation errors. Currently the time at the GPS monitor station is obtained from the GPS constellation and has an inherent inaccuracy as a result. Improved timing accuracy at the GPS monitoring stations will improve GPS performance. The US Naval Research Laboratory (NRL) is developing hardware and software for the GPS monitor station upgrade program to improve the monitor station clock accuracy. This upgrade will allow a method independent of the GPS satellite constellation of measuring and correcting monitor station time to US Naval Observatory (USNO) time. THe hardware consists of a high performance atomic cesium frequency standard (CFS) and a computer which is used to ensemble the CFS with the two CFS's currently located at the monitor station by use of a dual-mixer system. The dual-mixer system achieves phase measurements between the high-performance CFS and the existing monitor station CFS's to within 400 femtoseconds. Time transfer between USNO and a given monitor station is achieved via a two way satellite time transfer modem. The computer at the monitor station disciplines the CFS based on a comparison of one pulse per second sent from the master site at USNO. The monitor station computer is also used to perform housekeeping functions, as well as recording the health status of all three CFS's. This information is sent to the USNO through the time transfer modem. Laboratory time synchronization results in the sub nanosecond range have been observed and the ability to maintain the monitor station CFS frequency to within 3.0 x 10 (sup minus 14) of the master site at USNO.

  9. 76 FR 25345 - Annual Assessment of the Status of Competition in the Market for the Delivery of Video Programming

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-04

    ... as of June 30 of the relevant year to monitor trends on an annual basis. To continue our time-series... video programming? 24. MVPD Performance. We seek comment on the information and time- series data we... Television Performance. We seek information and time- series data for the analysis of various performance...

  10. 7 CFR 1484.74 - How is Cooperator program compliance monitored?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... compliance monitored? (a) The Compliance Review Staff (CRS), FAS, performs periodic on-site reviews of... Cooperator do not supplant private or U.S. industry funds or contributions pursuant to § 1550.20(a)(14), FAS...

  11. 7 CFR 1484.74 - How is Cooperator program compliance monitored?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... compliance monitored? (a) The Compliance Review Staff (CRS), FAS, performs periodic on-site reviews of... Cooperator do not supplant private or U.S. industry funds or contributions pursuant to § 1550.20(a)(14), FAS...

  12. 7 CFR 1484.74 - How is Cooperator program compliance monitored?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... compliance monitored? (a) The Compliance Review Staff (CRS), FAS, performs periodic on-site reviews of... Cooperator do not supplant private or U.S. industry funds or contributions pursuant to § 1550.20(a)(14), FAS...

  13. Aspect-Oriented Monitoring of C Programs

    NASA Technical Reports Server (NTRS)

    Havelund, Klaus; VanWyk, Eric

    2008-01-01

    The paper presents current work on extending ASPECTC with state machines, resulting in a framework for aspect-oriented monitoring of C programs. Such a framework can be used for testing purposes, or it can be part of a fault protection strategy. The long term goal is to explore the synergy between the fields of runtime verification, focused on program monitoring, and aspect-oriented programming, focused on more general program development issues. The work is inspired by the observation that most work in this direction has been done for JAVA, partly due to the lack of easily accessible extensible compiler frameworks for C. The work is performed using the SILVER extensible attribute grammar compiler framework, in which C has been defined as a host language. Our work consists of extending C with ASPECTC, and subsequently to extend ASPECTC with state machines.

  14. An Interactive Graphics Program for Investigating Digital Signal Processing.

    ERIC Educational Resources Information Center

    Miller, Billy K.; And Others

    1983-01-01

    Describes development of an interactive computer graphics program for use in teaching digital signal processing. The program allows students to interactively configure digital systems on a monitor display and observe their system's performance by means of digital plots on the system's outputs. A sample program run is included. (JN)

  15. Compilation of 1989 annual reports of the Navy ELF Communications System Ecological Monitoring Program. Volume 2. tabs C-F. Annual progress report, Jan-Dec 89

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1990-08-01

    This is the eighth compilation of annual reports for the Navy's ELF Communications Systems Ecological Monitoring Program. The reports document the progress of eight studies performed during 1989 near the Naval Radio Transmitting Facility -- Republic, Michigan. The purpose of the monitoring is to determine whether electromagnetic fields produced by the ELF Communications System will affect resident biota or their ecological relationships. Soil Amoeba: Arthropoda and Earthworms: Pollinating Insects: Small Mammals and Nesting Birds.

  16. Employment Service. Improved Leadership Needed for Better Performance. Report to the Chairman, Subcommittee on Employment Opportunities, Committee on Education and Labor, House of Representatives.

    ERIC Educational Resources Information Center

    General Accounting Office, Washington, DC. Div. of Human Resources.

    A study examined local U.S. Employment Service (ES) office placement performance and the role of the U.S. Department of Labor (DOL) in guiding and monitoring state and local ES program performance. Regression and other statistical methods were used to analyze state and local program performance based on the following: placement data for…

  17. SIMON: A Simple Instructional Monitor. Technical Report.

    ERIC Educational Resources Information Center

    Feurzeig, Wallace; And Others

    An instructional monitor is a program which tries to detect, diagnose, and possibly help overcome a student's learning difficulties in the course of solving a problem or performing a task. In one approach to building an instructional monitor, the student uses a special task- or problem-oriented language expressly designed around some particular…

  18. A multiyear quality control study of alpha-track radon monitors.

    PubMed

    Pearson, M D; Martz, D E; George, J L; Langner, G H

    1992-01-01

    Quality control exposures of commercial alpha-track radon monitors have been conducted approximately weekly at the U.S. Department of Energy (DOE) Grand Junction Projects Office since early 1987 in support of DOE remedial action programs. The results of these exposures provide a historical record of the comparative performances of these radon monitors.

  19. 77 FR 36577 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Tax...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-19

    ... PERFORMS, the performance management system for the UI program. UI PERFORMS incorporates a strategic planning process of identifying priorities; ongoing collection and monitoring of valid data to measure...

  20. Monitoring work zone safety and mobility impacts in Texas.

    DOT National Transportation Integrated Search

    2009-05-01

    In this report, Texas Transportation Institute researchers identify key work zone safety and mobility : performance measures that the Texas Department of Transportation (TxDOT) should target as part of a work : zone monitoring program within a distri...

  1. The Dry Aerosol Deposition Device (DADD): An Instrument for Depositing Microbial Aerosols onto Surfaces

    DTIC Science & Technology

    2008-12-01

    5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 6. AUTHOR( S ) 7...PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME( S ) AND ADDRESS(ES) 10. SPONSOR...MONITOR’S ACRONYM( S ) 11. SPONSOR/MONITOR’S REPORT NUMBER( S ) 12. DISTRIBUTION/AVAILABILITY STATEMENT 13. SUPPLEMENTARY NOTES 14. ABSTRACT 15

  2. 49 CFR 385.333 - What happens at the end of the 18-month safety monitoring period?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SAFETY REGULATIONS SAFETY FITNESS PROCEDURES New Entrant Safety Assurance Program § 385.333 What happens at the end of the 18-month safety monitoring period? (a) If a safety audit has been performed within... the same basis as any other carrier. (d) If a safety audit or compliance review has not been performed...

  3. Targeting Performance Dimensions in Sequence According to the Instructional Hierarchy: Effects on Children's Math Work within a Self-Monitoring Program

    ERIC Educational Resources Information Center

    Lannie, Amanda L.; Martens, Brian K.

    2008-01-01

    Four fifth-grade students were presented with frustration-level math probes while three performance dimensions were measured (i.e., percent intervals on-task, percent correct digits, and digits correct per minute (DCM)). Using a multiple baseline design across participants, students were trained to self-monitor time on-task, accuracy, and…

  4. 40 CFR 63.2161 - What performance tests and other procedures must I use if I monitor brew ethanol?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 12 2011-07-01 2009-07-01 true What performance tests and other procedures must I use if I monitor brew ethanol? 63.2161 Section 63.2161 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES National...

  5. ReactorHealth Physics operations at the NIST center for neutron research.

    PubMed

    Johnston, Thomas P

    2015-02-01

    Performing health physics and radiation safety functions under a special nuclear material license and a research and test reactor license at a major government research and development laboratory encompasses many elements not encountered by industrial, general, or broad scope licenses. This article reviews elements of the health physics and radiation safety program at the NIST Center for Neutron Research, including the early history and discovery of the neutron, applications of neutron research, reactor overview, safety and security of radiation sources and radioactive material, and general health physics procedures. These comprise precautions and control of tritium, training program, neutron beam sample processing, laboratory audits, inventory and leak tests, meter calibration, repair and evaluation, radioactive waste management, and emergency response. In addition, the radiation monitoring systems will be reviewed including confinement building monitoring, ventilation filter radiation monitors, secondary coolant monitors, gaseous fission product monitors, gas monitors, ventilation tritium monitor, and the plant effluent monitor systems.

  6. 7 CFR 215.11 - Special responsibilities of State agencies.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Section 215.11 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL MILK PROGRAM FOR CHILDREN § 215.11... managerial personnel to administer the Program and monitor performance of schools and child-care institutions...

  7. 7 CFR 215.11 - Special responsibilities of State agencies.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Section 215.11 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL MILK PROGRAM FOR CHILDREN § 215.11... managerial personnel to administer the Program and monitor performance of schools and child-care institutions...

  8. 7 CFR 215.11 - Special responsibilities of State agencies.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Section 215.11 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL MILK PROGRAM FOR CHILDREN § 215.11... managerial personnel to administer the Program and monitor performance of schools and child-care institutions...

  9. 7 CFR 215.11 - Special responsibilities of State agencies.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Section 215.11 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL MILK PROGRAM FOR CHILDREN § 215.11... managerial personnel to administer the Program and monitor performance of schools and child-care institutions...

  10. [Monitor of ECG signal and heart rate using a mobile phone with Bluetooth communication protocol].

    PubMed

    Becerra-Luna, Brayans; Dávila-García, Rodrigo; Salgado-Rodríguez, Paola; Martínez-Memije, Raúl; Infante-Vázquez, Oscar

    2012-01-01

    To develop a portable signal monitoring equipment for electrocardiography (ECG) and heart rate (HR), communicated with a mobile phone using the Bluetooth (BT) communication protocol for display of the signal on screen. A monitoring system was designed in which the electronic section performs the ECG signal acquisition, as well as amplification, filtering, analog to digital conversion and transmission of the ECG and HR using BT. Two programs were developed for the system. The first one calculates HR through QRS identification and sends the ECG signals and HR to the mobile, and the second program is an application to acquire and display them on the mobile screen. We developed a portable electronic system powered by a 9 volt battery, with amplification and bandwidth meeting the international standards for ECG monitoring. The QRS complex identification was performed using the second derivative algorithm, while the programs allow sending and receiving information from the ECG and HR via BT, and viewing it on the mobile screen. The monitoring is feasible within distances of 15 m and it has been tested in various mobiles telephones of brands Nokia®, Sony Ericsson® and Samsung®. This system shows an alternative for mobile monitoring using BT and Java 2 Micro Edition (J2ME) programming. It allows the register of the ECG trace and HR, and it can be implemented in different phones. Copyright © 2011 Instituto Nacional de Cardiología Ignacio Chávez. Published by Masson Doyma México S.A. All rights reserved.

  11. 45 CFR 1174.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... FOUNDATION ON THE ARTS AND THE HUMANITIES NATIONAL ENDOWMENT FOR THE HUMANITIES UNIFORM ADMINISTRATIVE... developments. Events may occur between the scheduled performance reporting dates which have significant impact...

  12. Land Application of Wastes: An Educational Program. Monitoring at Land Application Sites - Module 18, Objectives, Script, and Booklet.

    ERIC Educational Resources Information Center

    Clarkson, W. W.; And Others

    This module summarizes four major reasons for employing monitoring during design and operation of a land application site: documentation of existing water quality and system performance, confirmation of design parameters, provision of data for future designs and for management decisions. Monitoring requirements are examined for different land…

  13. 40 CFR 60.3043 - What operating parameter monitoring equipment must I install, and what operating parameters must...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What operating parameter monitoring equipment must I install, and what operating parameters must I monitor? 60.3043 Section 60.3043 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission...

  14. 40 CFR 60.2944 - What operating parameter monitoring equipment must I install, and what operating parameters must...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What operating parameter monitoring equipment must I install, and what operating parameters must I monitor? 60.2944 Section 60.2944 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Operator...

  15. Methodologies and Tools for Tuning Parallel Programs: 80% Art, 20% Science, and 10% Luck

    NASA Technical Reports Server (NTRS)

    Yan, Jerry C.; Bailey, David (Technical Monitor)

    1996-01-01

    The need for computing power has forced a migration from serial computation on a single processor to parallel processing on multiprocessors. However, without effective means to monitor (and analyze) program execution, tuning the performance of parallel programs becomes exponentially difficult as program complexity and machine size increase. In the past few years, the ubiquitous introduction of performance tuning tools from various supercomputer vendors (Intel's ParAide, TMC's PRISM, CRI's Apprentice, and Convex's CXtrace) seems to indicate the maturity of performance instrumentation/monitor/tuning technologies and vendors'/customers' recognition of their importance. However, a few important questions remain: What kind of performance bottlenecks can these tools detect (or correct)? How time consuming is the performance tuning process? What are some important technical issues that remain to be tackled in this area? This workshop reviews the fundamental concepts involved in analyzing and improving the performance of parallel and heterogeneous message-passing programs. Several alternative strategies will be contrasted, and for each we will describe how currently available tuning tools (e.g. AIMS, ParAide, PRISM, Apprentice, CXtrace, ATExpert, Pablo, IPS-2) can be used to facilitate the process. We will characterize the effectiveness of the tools and methodologies based on actual user experiences at NASA Ames Research Center. Finally, we will discuss their limitations and outline recent approaches taken by vendors and the research community to address them.

  16. 7 CFR 3015.92 - Performance reports.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Performance reports. 3015.92 Section 3015.92..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Monitoring and Reporting Program Performance § 3015.92 Performance reports. (a) Nonconstruction. The awarding agency shall, if it decides that...

  17. 7 CFR 3015.92 - Performance reports.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Performance reports. 3015.92 Section 3015.92..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Monitoring and Reporting Program Performance § 3015.92 Performance reports. (a) Nonconstruction. The awarding agency shall, if it decides that...

  18. 7 CFR 3015.92 - Performance reports.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Performance reports. 3015.92 Section 3015.92..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Monitoring and Reporting Program Performance § 3015.92 Performance reports. (a) Nonconstruction. The awarding agency shall, if it decides that...

  19. 7 CFR 3015.92 - Performance reports.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Performance reports. 3015.92 Section 3015.92..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Monitoring and Reporting Program Performance § 3015.92 Performance reports. (a) Nonconstruction. The awarding agency shall, if it decides that...

  20. Strategic Defense Initiative Organization adaptive structures program overview

    NASA Astrophysics Data System (ADS)

    Obal, Michael; Sater, Janet M.

    In the currently envisioned architecture none of the Strategic Defense System (SDS) elements to be deployed will receive scheduled maintenance. Assessments of performance capability due to changes caused by the uncertain effects of environments will be difficult, at best. In addition, the system will have limited ability to adjust in order to maintain its required performance levels. The Materials and Structures Office of the Strategic Defense Initiative Organization (SDIO) has begun to address solutions to these potential difficulties via an adaptive structures technology program that combines health and environment monitoring with static and dynamic structural control. Conceivable system benefits include improved target tracking and hit-to-kill performance, on-orbit system health monitoring and reporting, and threat attack warning and assessment.

  1. 45 CFR 1157.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... FOUNDATION ON THE ARTS AND THE HUMANITIES NATIONAL ENDOWMENT FOR THE ARTS UNIFORM ADMINISTRATIVE REQUIREMENTS... developments. Events may occur between the scheduled performance reporting dates which have significant impact...

  2. Georgia Long-Term Pavement Performance (GALTPP) Program – Maintaining Georgia’s Calibration Sites and Identifying the Potential for Using MEPDG for Characterization of Non-Standard Materials and Methods (Phase 1)

    DOT National Transportation Integrated Search

    2016-10-01

    The Georgia Department of Transportation (GDOT) has initiated a Georgia Long-Term Pavement Performance (GALTPP) monitoring program 1) to provide data for calibrating the prediction models in the AASHTO Mechanistic-Empirical Pavement Design Guide (MEP...

  3. On-line data analysis and monitoring for H1 drift chambers

    NASA Astrophysics Data System (ADS)

    Düllmann, Dirk

    1992-05-01

    The on-line monitoring, slow control and calibration of the H1 central jet chamber uses a VME multiprocessor system to perform the analysis and a connected Macintosh computer as graphical interface to the operator on shift. Task of this system are: - analysis of event data including on-line track search, - on-line calibration from normal events and testpulse events, - control of the high voltage and monitoring of settings and currents, - monitoring of temperature, pressure and mixture of the chambergas. A program package is described which controls the dataflow between data aquisition, differnt VME CPUs and Macintosh. It allows to run off-line style programs for the different tasks.

  4. 7 CFR 3019.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... award. Recipients shall monitor subawards to ensure subrecipients have met the audit requirements as...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award...

  5. 7 CFR 3019.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... award. Recipients shall monitor subawards to ensure subrecipients have met the audit requirements as...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award...

  6. 7 CFR 3019.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... award. Recipients shall monitor subawards to ensure subrecipients have met the audit requirements as...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award...

  7. 7 CFR 3019.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... award. Recipients shall monitor subawards to ensure subrecipients have met the audit requirements as...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award...

  8. Long-Term Monitoring of Pavement Maintenance Materials Test Sites

    DOT National Transportation Integrated Search

    1998-06-01

    The Strategic Highway Research Program's {SHRP) H-106 pothole repair experiment was part of the most extensive pavement maintenance experiment ever conducted. Started under SHRP and continued under the Long-Term Pavement Performance program's Long-Te...

  9. Long-Term Pavement Performance Program

    DOT National Transportation Integrated Search

    2015-12-01

    The LTPP program will yield additional benefits as data are added to the database and as data analysis effortssome currently planned and some yet to be identifiedare completed. Continued monitoring of the test sections that remain in service is...

  10. ENVIRONMENTAL TECHNOLOGY VERIFICATION (ETV) PROGRAM: GREEN BUILDING TECHNOLOGIES

    EPA Science Inventory

    The U.S. Environmental Protection Agency (EPA) Environmental Technology Verification (ETV) Program evaluates the performance of innovative air, water, pollution prevention and monitoring technologies that have the potential to improve human health and the environment. This techno...

  11. ENVIRONMENTAL TECHNOLOGY VERIFICATION (ETV) PROGRAM: FUEL CELLS

    EPA Science Inventory

    The U.S. Environmental Protection Agency (EPA) Environmental Technology Verification (ETV) Program evaluates the performance of innovative air, water, pollution prevention and monitoring technologies that have the potential to improve human health and the environment. This techno...

  12. ENVIRONMENTAL TECHNOLOGY VERIFICATION (ETV) PROGRAM: STORMWATER TECHNOLOGIES

    EPA Science Inventory

    The U.S. Environmental Protection Agency (EPA) Environmental Technology Verification (ETV) program evaluates the performance of innovative air, water, pollution prevention and monitoring technologies that have the potential to improve human health and the environment. This techn...

  13. ENVIRONMENTAL TECHNOLOGY VERIFICATION (ETV) PROGRAM; BAGHOUSE FILTRATION PRODUCTS

    EPA Science Inventory

    The U.S. Environmental Protection Agency (EPA) Environmental Technology Verification (ETV) Program evaluates the performance of innovative air, water, pollution prevention and monitoring technologies that have the potential to improve human health and the environment. This techno...

  14. ETV - HOMELAND SECURITY EVALUATION OF CYANIDE DETECTORS

    EPA Science Inventory

    EPA's Environmental Technology Verification (ETV) Program was established in 1995 to objectively verify the performance of technologies that measure / monitor the quality of our environment, both for background or at suspected contamination site. The ETV program has established...

  15. ENVIRONMENTAL TECHNOLOGY VERIFICATION PROGRAM FOR MONITORING AND CHARACTERIZATION

    EPA Science Inventory

    The Environmental Technology Verification Program is a service of the Environmental Protection Agency designed to accelerate the development and commercialization of improved environmental technology through third party verification and reporting of performance. The goal of ETV i...

  16. 2 CFR 200.328 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... § 200.331 Requirements for pass-through entities. (b) Non-construction performance reports. The Federal... (including performance progress reports, Research Performance Progress Report, or such future collections as... performance reports at the interval required by the Federal awarding agency or pass-through entity to best...

  17. NASA's Lunar Impact Monitoring Program

    NASA Technical Reports Server (NTRS)

    Suggs, Robert M.; Cooke, William; Swift, Wesley; Hollon, Nicholas

    2007-01-01

    NASA's Meteoroid Environment Office nas implemented a program to monitor the Moon for meteoroid impacts from the Marshall Space Flight Center. Using off-the-shelf telescopes and video equipment, the moon is monitored for as many as 10 nights per month, depending on weather. Custom software automatically detects flashes which are confirmed by a second telescope, photometrically calibrated using background stars, and published on a website for correlation with other observations, Hypervelocity impact tests at the Ames Vertical Gun Facility have been performed to determine the luminous efficiency ana ejecta characteristics. The purpose of this research is to define the impact ejecta environment for use by lunar spacecraft designers of the Constellation (manned lunar) Program. The observational techniques and preliminary results will be discussed.

  18. 10 CFR 600.341 - Monitoring and reporting program and financial performance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... will be taken to address the deviations. (2) A final technical report if the award is for research and... dates for reports. At a minimum, requirements must include: (1) Periodic progress reports (at least... follows: (i) The program portions of the reports must address progress toward achieving program...

  19. 10 CFR 600.341 - Monitoring and reporting program and financial performance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... will be taken to address the deviations. (2) A final technical report if the award is for research and... dates for reports. At a minimum, requirements must include: (1) Periodic progress reports (at least... follows: (i) The program portions of the reports must address progress toward achieving program...

  20. 10 CFR 600.341 - Monitoring and reporting program and financial performance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... will be taken to address the deviations. (2) A final technical report if the award is for research and... dates for reports. At a minimum, requirements must include: (1) Periodic progress reports (at least... follows: (i) The program portions of the reports must address progress toward achieving program...

  1. 10 CFR 600.341 - Monitoring and reporting program and financial performance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... will be taken to address the deviations. (2) A final technical report if the award is for research and... dates for reports. At a minimum, requirements must include: (1) Periodic progress reports (at least... follows: (i) The program portions of the reports must address progress toward achieving program...

  2. Conceptual design of a monitoring system for the Charters of Freedom

    NASA Technical Reports Server (NTRS)

    Cutts, J. A.

    1984-01-01

    A conceptual design of a monitoring system for the Charters of Freedom was developed for the National Archives and Records Service. The monitoring system would be installed at the National Archives and used to document the condition of the Charters as part of a regular inspection program. The results of an experimental measurements program that led to the definition of analysis system requirements are presented, a conceptual design of the monitoring system is described and the alternative approaches to implementing this design were discussed. The monitoring system is required to optically detect and measure deterioration in documents that are permanently encapsulated in glass cases. An electronic imaging system with the capability for precise photometric measurements of the contrast of the script on the documents can perform this task. Two general types of imaging systems are considered (line and area array), and their suitability for performing these required measurements are compared. A digital processing capability for analyzing the electronic imaging data is also required, and several optional levels of complexity for this digital analysis system are evaluated.

  3. The Chandra Monitoring System

    NASA Astrophysics Data System (ADS)

    Wolk, S. J.; Petreshock, J. G.; Allen, P.; Bartholowmew, R. T.; Isobe, T.; Cresitello-Dittmar, M.; Dewey, D.

    The NASA Great Observatory Chandra was launched July 23, 1999 aboard the space shuttle Columbia. The Chandra Science Center (CXC) runs a monitoring and trends analysis program to maximize the science return from this mission. At the time of the launch, the monitoring portion of this system was in place. The system is a collection of multiple threads and programming methodologies acting cohesively. Real-time data are passed to the CXC. Our real-time tool, ACORN (A Comprehensive object-ORiented Necessity), performs limit checking of performance related hardware. Chandra is in ground contact less than 3 hours a day, so the bulk of the monitoring must take place on data dumped by the spacecraft. To do this, we have written several tools which run off of the CXC data system pipelines. MTA_MONITOR_STATIC, limit checks FITS files containing hardware data. MTA_EVENT_MON and MTA_GRAT_MON create quick look data for the focal place instruments and the transmission gratings. When instruments violate their operational limits, the responsible scientists are notified by email and problem tracking is initiated. Output from all these codes is distributed to CXC scientists via HTML interface.

  4. PPC750 Performance Monitor

    NASA Technical Reports Server (NTRS)

    Meyer, Donald; Uchenik, Igor

    2007-01-01

    The PPC750 Performance Monitor (Perfmon) is a computer program that helps the user to assess the performance characteristics of application programs running under the Wind River VxWorks real-time operating system on a PPC750 computer. Perfmon generates a user-friendly interface and collects performance data by use of performance registers provided by the PPC750 architecture. It processes and presents run-time statistics on a per-task basis over a repeating time interval (typically, several seconds or minutes) specified by the user. When the Perfmon software module is loaded with the user s software modules, it is available for use through Perfmon commands, without any modification of the user s code and at negligible performance penalty. Per-task run-time performance data made available by Perfmon include percentage time, number of instructions executed per unit time, dispatch ratio, stack high water mark, and level-1 instruction and data cache miss rates. The performance data are written to a file specified by the user or to the serial port of the computer

  5. DAM Safety and Deformation Monitoring in Dams

    NASA Astrophysics Data System (ADS)

    Kalkan, Y.; Bilgi, S.; Potts, L.; Miiama, J.; Mahgoub, M.; Rahman, S.

    2013-12-01

    Water is the life and necessity to water is increasing day by day with respect to the World population, rising of living standards and destruction of nature. Thus, the importance of water and water structures have been increasing gradually. Dams are among the most important engineering structures used for water supplies, flood controls, agricultural purposes as well as drinking and hydroelectric power. There are about 150.000 large size dams in the World. Especially after the Second World War, higher and larger capacity dams have been constructed. Dams create certain risks like the other manmade structures. No one knows precisely how many dam failures have occurred in the World, whereas hundreds of dam failures have occurred throughout the U.S. history. Some basic physical data are very important for assessing the safety and performance of dams. These are movement, water pressure, seepage, reservoir and tail-water elevations, local seismic activities, total pressure, stress and strain, internal concrete temperature, ambient temperature and precipitation. These physical data are measured and monitored by the instruments and equipment. Dams and their surroundings have to be monitored by using essential methods at periodic time intervals in order to determine the possible changes that may occur over the time. Monitoring programs typically consist of; surveillance or visual observation. These programs on dams provide information for evaluating the dam's performance related to the design intent and expected changes that could affect the safety performance of the dam. Additionally, these programs are used for investigating and evaluating the abnormal or degrading performance where any remedial action is necessary. Geodetic and non-geodetic methods are used for monitoring. Monitoring the performance of the dams is critical for producing and maintaining the safe dams. This study provides some information, safety and the techniques about the deformation monitoring of the dams. Therefore, this study gives essential information about the dam safety and related analysis. Monitoring of dams is crucial since deformation might have occurred as a result of erosion, water load, hydraulic gradients, and water saturation. The case study is the deformation measurements of Ataturk Dam. This dam was constructed on Firat River and it has importance for providing drinking water, hydroelectric power and especially irrigation. In addition, brief information is given about this dam and the methods of geodetic and non-geodetic monitoring measurements applied by various disciplines. Geodetic monitoring methods are emphasized in this study. Some results have been obtained from this method for nearly seven years are presented in this work. In addition, some deformation predictions have been made especially for the cross sections where the maximum deformations took place.

  6. Development of the performance confirmation program at YUCCA mountain, nevada

    USGS Publications Warehouse

    LeCain, G.D.; Barr, D.; Weaver, D.; Snell, R.; Goodin, S.W.; Hansen, F.D.

    2006-01-01

    The Yucca Mountain Performance Confirmation program consists of tests, monitoring activities, experiments, and analyses to evaluate the adequacy of assumptions, data, and analyses that form the basis of the conceptual and numerical models of flow and transport associated with a proposed radioactive waste repository at Yucca Mountain, Nevada. The Performance Confirmation program uses an eight-stage risk-informed, performance-based approach. Selection of the Performance Confirmation activities for inclusion in the Performance Confirmation program was done using a risk-informed performance-based decision analysis. The result of this analysis was a Performance Confirmation base portfolio that consists of 20 activities. The 20 Performance Confirmation activities include geologic, hydrologie, and construction/engineering testing. Some of the activities began during site characterization, and others will begin during construction, or post emplacement, and continue until repository closure.

  7. The Rendezvous Monitoring Display Capabilities of the Rendezvous and Proximity Operations Program

    NASA Technical Reports Server (NTRS)

    Brazzel, Jack; Spehar, Pete; Clark, Fred; Foster, Chris; Eldridge, Erin

    2013-01-01

    The Rendezvous and Proximity Operations Program (RPOP) is a laptop computer- based relative navigation tool and piloting aid that was developed during the Space Shuttle program. RPOP displays a graphical representation of the relative motion between the target and chaser vehicles in a rendezvous, proximity operations and capture scenario. After being used in over 60 Shuttle rendezvous missions, some of the RPOP display concepts have become recognized as a minimum standard for cockpit displays for monitoring the rendezvous task. To support International Space Station (ISS) based crews in monitoring incoming visiting vehicles, RPOP has been modified to allow crews to compare the Cygnus visiting vehicle s onboard navigated state to processed range measurements from an ISS-based, crew-operated Hand Held Lidar sensor. This paper will discuss the display concepts of RPOP that have proven useful in performing and monitoring rendezvous and proximity operations.

  8. 7 CFR 550.26 - Monitoring program performance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... problems and areas where technical assistance might be necessary. This active monitoring is accomplished through review of reports and correspondence from the cooperator, audit reports, site visits, and other... administratively closed out and no longer providing active support in order to resolve issues of accountability and...

  9. 7 CFR 550.26 - Monitoring program performance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... problems and areas where technical assistance might be necessary. This active monitoring is accomplished through review of reports and correspondence from the cooperator, audit reports, site visits, and other... administratively closed out and no longer providing active support in order to resolve issues of accountability and...

  10. 7 CFR 550.26 - Monitoring program performance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... problems and areas where technical assistance might be necessary. This active monitoring is accomplished through review of reports and correspondence from the cooperator, audit reports, site visits, and other... administratively closed out and no longer providing active support in order to resolve issues of accountability and...

  11. 7 CFR 550.26 - Monitoring program performance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... problems and areas where technical assistance might be necessary. This active monitoring is accomplished through review of reports and correspondence from the cooperator, audit reports, site visits, and other... administratively closed out and no longer providing active support in order to resolve issues of accountability and...

  12. 41 CFR 105-72.601 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... award. Recipients shall monitor subawards to ensure subrecipients have met the audit requirements as...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS 72.60-Post-Award Requirements...

  13. 41 CFR 105-72.601 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... award. Recipients shall monitor subawards to ensure subrecipients have met the audit requirements as...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS 72.60-Post-Award Requirements...

  14. 41 CFR 105-72.601 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... award. Recipients shall monitor subawards to ensure subrecipients have met the audit requirements as...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS 72.60-Post-Award Requirements...

  15. 34 CFR 74.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the award. Recipients shall monitor subawards to ensure subrecipients have met the audit requirements...) Recipients shall immediately notify the Secretary of developments that have a significant impact on the award... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award...

  16. 34 CFR 74.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the award. Recipients shall monitor subawards to ensure subrecipients have met the audit requirements...) Recipients shall immediately notify the Secretary of developments that have a significant impact on the award... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award...

  17. 36 CFR § 1210.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... award. Recipients shall monitor subawards to ensure subrecipients have met the audit requirements as...) Recipients shall immediately notify the NHPRC of developments that have a significant impact on the award... WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award...

  18. 34 CFR 74.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the award. Recipients shall monitor subawards to ensure subrecipients have met the audit requirements...) Recipients shall immediately notify the Secretary of developments that have a significant impact on the award... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award...

  19. 41 CFR 105-72.601 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... award. Recipients shall monitor subawards to ensure subrecipients have met the audit requirements as...) Recipients shall immediately notify the Federal awarding agency of developments that have a significant... OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS 72.60-Post-Award Requirements...

  20. 34 CFR 74.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the award. Recipients shall monitor subawards to ensure subrecipients have met the audit requirements...) Recipients shall immediately notify the Secretary of developments that have a significant impact on the award... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award...

  1. 76 FR 63288 - Notice of Proposed Information Collection Requests

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-12

    ... ED to monitor CSP grant performance and analyze data related to accountability for academic performance, financial integrity, and program effectiveness. Copies of the proposed information collection... database of current CSP-funded charter schools and award amounts; ED merges performance information...

  2. User manual and spreadsheet tool for implementing performance planning for rural planning organizations.

    DOT National Transportation Integrated Search

    2017-03-01

    The performance-planning tool developed as part of this project is intended for use with the guidebook for establishing and using rural performance based transportation system assessment, monitoring, planning, and programming to support the rural pla...

  3. ENVIRONMENTAL TECHNOLOGY VERIFICATION (ETV) PROGRAM: ETV AND ANIMAL FEEDING OPERATIONS

    EPA Science Inventory

    The U.S. Environmental Protection Agency (EPA) Environmental Technology Verification (ETV) program evaluates the performance of innovative air, water, pollution prevention and monitoring technologies that have the potential to improve human health and the environment. This techn...

  4. Fiber Optic Sensors for Health Monitoring of Morphing Aircraft

    NASA Technical Reports Server (NTRS)

    Brown, Timothy; Wood, Karen; Childers, Brooks; Cano, Roberto; Jensen, Brian; Rogowski, Robert

    2001-01-01

    Fiber optic sensors are being developed for health monitoring of future aircraft. Aircraft health monitoring involves the use of strain, temperature, vibration and chemical sensors. These sensors will measure load and vibration signatures that will be used to infer structural integrity. Sine the aircraft morphing program assumes that future aircraft will be aerodynamically reconfigurable there is also a requirement for pressure, flow and shape sensors. In some cases a single fiber may be used for measuring several different parameters. The objective of the current program is to develop techniques for using optical fibers to monitor composite cure in real time during manufacture and to monitor in-service structural integrity of the composite structure. Graphite-epoxy panels were fabricated with integrated optical fibers of various types. The panels were mechanically and thermally tested to evaluate composite strength and sensor durability. Finally the performance of the fiber optic sensors was determined. Experimental results are presented evaluating the performance of embedded and surface mounted optical fibers for measuring strain, temperature and chemical composition. The performance of the fiber optic sensors was determined by direct comparison with results from more conventional instrumentation. The facilities for fabricating optical fiber and associated sensors and methods of demodulating Bragg gratings for strain measurement will be described.

  5. An Assessment of Fiscal Year 2013 Beyond Yellow Ribbon Programs

    DTIC Science & Technology

    2015-01-01

    2013 Beyond Yellow Ribbon Programs 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) 5d. PROJECT NUMBER 5e. TASK NUMBER...5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) RAND Corporation,National Defense Research Institute,1776 Main Street, P.O...Box 2138,Santa Monica,CA,90407-2138 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME( S ) AND ADDRESS(ES) 10. SPONSOR

  6. Toward Affordable Systems II: Portfolio Management for Army Science and Technology Programs Under Uncertainties

    DTIC Science & Technology

    2011-01-01

    5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Rand Corporation ,Arroyo Center,PO Box...2138, 1776 Main Street,Santa Monica,CA,90407-2138 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES...research, development, test , and evaluation programs; and those who are interested in the optimal allocation of funds among different programs and/or

  7. Next Generation Performance Monitoring Data Needs for Nevada DOT

    DOT National Transportation Integrated Search

    2014-12-24

    This report examines state-of-practice for performance measurement and focuses on federal requirements for traveler information mandated by SAFETEA-LU Section 1201 Real-Time System Management Information Program. Guidance for November 2016 compliance...

  8. User-level framework for performance monitoring of HPC applications

    NASA Astrophysics Data System (ADS)

    Hristova, R.; Goranov, G.

    2013-10-01

    HP-SEE is an infrastructure that links the existing HPC facilities in South East Europe in a common infrastructure. The analysis of the performance monitoring of the High-Performance Computing (HPC) applications in the infrastructure can be useful for the end user as diagnostic for the overall performance of his applications. The existing monitoring tools for HP-SEE provide to the end user only aggregated information for all applications. Usually, the user does not have permissions to select only the relevant information for him and for his applications. In this article we present a framework for performance monitoring of the HPC applications in the HP-SEE infrastructure. The framework provides standardized performance metrics, which every user can use in order to monitor his applications. Furthermore as a part of the framework a program interface is developed. The interface allows the user to publish metrics data from his application and to read and analyze gathered information. Publishing and reading through the framework is possible only with grid certificate valid for the infrastructure. Therefore the user is authorized to access only the data for his applications.

  9. Why do water quality monitoring programs succeed or fail? A qualitative comparative analysis of regulated testing systems in sub-Saharan Africa.

    PubMed

    Peletz, Rachel; Kisiangani, Joyce; Bonham, Mateyo; Ronoh, Patrick; Delaire, Caroline; Kumpel, Emily; Marks, Sara; Khush, Ranjiv

    2018-05-31

    Water quality testing is critical for guiding water safety management and ensuring public health. In many settings, however, water suppliers and surveillance agencies do not meet regulatory requirements for testing frequencies. This study examines the conditions that promote successful water quality monitoring in Africa, with the goal of providing evidence for strengthening regulated water quality testing programs. We compared monitoring programs among 26 regulated water suppliers and surveillance agencies across six African countries. These institutions submitted monthly water quality testing results over 18 months. We also collected qualitative data on the conditions that influenced testing performance via approximately 821 h of semi-structured interviews and observations. Based on our qualitative data, we developed the Water Capacity Rating Diagnostic (WaterCaRD) to establish a scoring framework for evaluating the effects of the following conditions on testing performance: accountability, staffing, program structure, finances, and equipment & services. We summarized the qualitative data into case studies for each of the 26 institutions and then used the case studies to score the institutions against the conditions captured in WaterCaRD. Subsequently, we applied fuzzy-set Qualitative Comparative Analysis (fsQCA) to compare these scores against performance outcomes for water quality testing. We defined the performance outcomes as the proportion of testing Targets Achieved (outcome 1) and Testing Consistency (outcome 2) based on the monthly number of microbial water quality tests conducted by each institution. Our analysis identified motivation & leadership, knowledge, staff retention, and transport as institutional conditions that were necessary for achieving monitoring targets. In addition, equipment, procurement, infrastructure, and enforcement contributed to the pathways that resulted in strong monitoring performance. Our identification of institutional commitment, comprising motivation & leadership, knowledge, and staff retention, as a key driver of monitoring performance was not surprising: in weak regulatory environments, individuals and their motivations take-on greater importance in determining institutional and programmatic outcomes. Nevertheless, efforts to build data collection capacity in low-resource settings largely focus on supply-side interventions: the provision of infrastructure, equipment, and training sessions. Our results indicate that these interventions will continue to have limited long-term impacts and sustainability without complementary strategies for motivating or incentivizing water supply and surveillance agency managers to achieve testing goals. More broadly, our research demonstrates both an experimental approach for diagnosing the systems that underlie service provision and an analytical strategy for identifying appropriate interventions. Copyright © 2018 The Authors. Published by Elsevier GmbH.. All rights reserved.

  10. 24 CFR 1006.410 - Performance reports.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Performance reports. 1006.410 Section 1006.410 Housing and Urban Development Regulations Relating to Housing and Urban Development... DEVELOPMENT NATIVE HAWAIIAN HOUSING BLOCK GRANT PROGRAM Monitoring and Accountability § 1006.410 Performance...

  11. 24 CFR 1006.410 - Performance reports.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Performance reports. 1006.410 Section 1006.410 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT... DEVELOPMENT NATIVE HAWAIIAN HOUSING BLOCK GRANT PROGRAM Monitoring and Accountability § 1006.410 Performance...

  12. 24 CFR 1006.410 - Performance reports.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Performance reports. 1006.410 Section 1006.410 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT... DEVELOPMENT NATIVE HAWAIIAN HOUSING BLOCK GRANT PROGRAM Monitoring and Accountability § 1006.410 Performance...

  13. 24 CFR 1006.410 - Performance reports.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Performance reports. 1006.410 Section 1006.410 Housing and Urban Development REGULATIONS RELATING TO HOUSING AND URBAN DEVELOPMENT... DEVELOPMENT NATIVE HAWAIIAN HOUSING BLOCK GRANT PROGRAM Monitoring and Accountability § 1006.410 Performance...

  14. 5 CFR 430.207 - Monitoring performance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... appraisal program shall include methods for appraising each critical and non-critical element during the appraisal period. Performance on each critical and non-critical element shall be appraised against its... provide assistance whenever performance is determined to be below “Fully Successful” or equivalent but...

  15. 5 CFR 430.207 - Monitoring performance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... appraisal program shall include methods for appraising each critical and non-critical element during the appraisal period. Performance on each critical and non-critical element shall be appraised against its... provide assistance whenever performance is determined to be below “Fully Successful” or equivalent but...

  16. 40 CFR 63.7191 - What records must I keep?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... malfunctions. (3) Records of performance tests and performance evaluations as required in § 63.10(b)(2)(viii... measurements, raw performance evaluation measurements). (3) All required CMS measurements (including monitoring... Section 63.7191 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS...

  17. ENVIRONMENTAL TECHNOLOGY VERIFICATION (ETV) PROGRAM: MICROTURBINES AND COMBINED HEAT AND POWER TECHNOLOGIES

    EPA Science Inventory

    The U.S. Environmental Protection Agency (EPA) Environmental Technology Verification(ETV) Program evaluates the performance of innovatiave air, water, pollution prevention and monitoring technologies that have the potential to improve human health and the environment. This techno...

  18. ENVIRONMENTAL TECHNOLOGY VERIFICATION PROGRAM - ADVANCED MONITORING SYSTEMS OUTREACH

    EPA Science Inventory

    Technology performance information must be effectively communicated if it is to be of value to prospective users. The U.S. Environmental Protection Agency has provided funding to the Environmental Technology Verification (ETV) program to provide a plan to verify the environmen...

  19. Apollo/Skylab suit program management systems study. Volume 2: Cost analysis

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The business management methods employed in the performance of the Apollo-Skylab Suit Program are studied. The data accumulated over the span of the contract as well as the methods used to accumulate the data are examined. Management methods associated with the monitoring and control of resources applied towards the performance of the contract are also studied and recommended upon. The primary objective is the compilation, analysis, and presentation of historical cost performance criteria. Cost data are depicted for all phases of the Apollo-Skylab program in common, meaningful terms, whereby the data may be applicable to future suit program planning efforts.

  20. Designing Reading Instruction for Cultural Minorities: The Case of the Kamehameha Early Education Program.

    ERIC Educational Resources Information Center

    Calfee, Robert C.; And Others

    This is a report on the Kamehameha Early Education Program (KEEP), a research and development project designed to find ways of improving the school performance of educationally disadvantaged Hawaiian children. The project, implemented in a laboratory school setting and continuously monitored, is described as a reading instruction program for…

  1. Demonstration of innovative monitoring technologies at the Savannah River Integrated Demonstration Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rossabi, J.; Jenkins, R.A.; Wise, M.B.

    1993-12-31

    The Department of Energy`s Office of Technology Development initiated an Integrated Demonstration Program at the Savannah River Site in 1989. The objective of this program is to develop, demonstrate, and evaluate innovative technologies that can improve present-day environmental restoration methods. The Integrated Demonstration Program at SRS is entitled ``Cleanup of Organics in Soils and Groundwater at Non-Arid Sites.`` New technologies in the areas of drilling, characterization, monitoring, and remediation are being demonstrated and evaluated for their technical performance and cost effectiveness in comparison with baseline technologies. Present site characterization and monitoring methods are costly, time-consuming, overly invasive, and often imprecise.more » Better technologies are required to accurately describe the subsurface geophysical and geochemical features of a site and the nature and extent of contamination. More efficient, nonintrusive characterization and monitoring techniques are necessary for understanding and predicting subsurface transport. More reliable procedures are also needed for interpreting monitoring and characterization data. Site characterization and monitoring are key elements in preventing, identifying, and restoring contaminated sites. The remediation of a site cannot be determined without characterization data, and monitoring may be required for 30 years after site closure.« less

  2. Monitoring Data-Structure Evolution in Distributed Message-Passing Programs

    NASA Technical Reports Server (NTRS)

    Sarukkai, Sekhar R.; Beers, Andrew; Woodrow, Thomas S. (Technical Monitor)

    1996-01-01

    Monitoring the evolution of data structures in parallel and distributed programs, is critical for debugging its semantics and performance. However, the current state-of-art in tracking and presenting data-structure information on parallel and distributed environments is cumbersome and does not scale. In this paper we present a methodology that automatically tracks memory bindings (not the actual contents) of static and dynamic data-structures of message-passing C programs, using PVM. With the help of a number of examples we show that in addition to determining the impact of memory allocation overheads on program performance, graphical views can help in debugging the semantics of program execution. Scalable animations of virtual address bindings of source-level data-structures are used for debugging the semantics of parallel programs across all processors. In conjunction with light-weight core-files, this technique can be used to complement traditional debuggers on single processors. Detailed information (such as data-structure contents), on specific nodes, can be determined using traditional debuggers after the data structure evolution leading to the semantic error is observed graphically.

  3. A Structural Health Monitoring Software Tool for Optimization, Diagnostics and Prognostics

    DTIC Science & Technology

    2011-01-01

    A Structural Health Monitoring Software Tool for Optimization, Diagnostics and Prognostics Seth S . Kessler1, Eric B. Flynn2, Christopher T...technology more accessible, and commercially practical. 1. INTRODUCTION Currently successful laboratory non- destructive testing and monitoring...PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES

  4. Department of Defense Chemical and Biological Defense Program. FY2004-2006 Performance Plan

    DTIC Science & Technology

    2005-03-01

    Agents (NTAs) Compare the direct effects of PAF on smooth muscle, hematic constituents, and lung to determine role in toxicity. Continue to identify...Range Biometric Target ID System Explore technologies for a long range biometric target identification system. Air Containment Monitoring System...Continue development of systems for contained air monitoring for chemical agents.Long Range Biometric Air Containment Monitoring System Continued

  5. Jeagle: a JAVA Runtime Verification Tool

    NASA Technical Reports Server (NTRS)

    DAmorim, Marcelo; Havelund, Klaus

    2005-01-01

    We introduce the temporal logic Jeagle and its supporting tool for runtime verification of Java programs. A monitor for an Jeagle formula checks if a finite trace of program events satisfies the formula. Jeagle is a programming oriented extension of the rule-based powerful Eagle logic that has been shown to be capable of defining and implementing a range of finite trace monitoring logics, including future and past time temporal logic, real-time and metric temporal logics, interval logics, forms of quantified temporal logics, and so on. Monitoring is achieved on a state-by-state basis avoiding any need to store the input trace. Jeagle extends Eagle with constructs for capturing parameterized program events such as method calls and method returns. Parameters can be the objects that methods are called upon, arguments to methods, and return values. Jeagle allows one to refer to these in formulas. The tool performs automated program instrumentation using AspectJ. We show the transformational semantics of Jeagle.

  6. Mechanical systems readiness assessment and performance monitoring study

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The problem of mechanical devices which lack the real-time readiness assessment and performance monitoring capability required for future space missions is studied. The results of a test program to establish the feasibility of implementing structure borne acoustics, a nondestructive test technique, are described. The program included the monitoring of operational acoustic signatures of five separate mechanical components, each possessing distinct sound characteristics. Acoustic signatures were established for normal operation of each component. Critical failure modes were then inserted into the test components, and faulted acoustic signatures obtained. Predominant features of the sound signature were related back to operational events occurring within the components both for normal and failure mode operations. All of these steps can be automated. The structure borne acoustics technique lends itself to reducing checkout time, simplifying maintenance procedures, and reducing manual involvement in the checkout, operation, maintenance, and fault diagnosis of mechanical systems.

  7. Structural health monitoring feature design by genetic programming

    NASA Astrophysics Data System (ADS)

    Harvey, Dustin Y.; Todd, Michael D.

    2014-09-01

    Structural health monitoring (SHM) systems provide real-time damage and performance information for civil, aerospace, and other high-capital or life-safety critical structures. Conventional data processing involves pre-processing and extraction of low-dimensional features from in situ time series measurements. The features are then input to a statistical pattern recognition algorithm to perform the relevant classification or regression task necessary to facilitate decisions by the SHM system. Traditional design of signal processing and feature extraction algorithms can be an expensive and time-consuming process requiring extensive system knowledge and domain expertise. Genetic programming, a heuristic program search method from evolutionary computation, was recently adapted by the authors to perform automated, data-driven design of signal processing and feature extraction algorithms for statistical pattern recognition applications. The proposed method, called Autofead, is particularly suitable to handle the challenges inherent in algorithm design for SHM problems where the manifestation of damage in structural response measurements is often unclear or unknown. Autofead mines a training database of response measurements to discover information-rich features specific to the problem at hand. This study provides experimental validation on three SHM applications including ultrasonic damage detection, bearing damage classification for rotating machinery, and vibration-based structural health monitoring. Performance comparisons with common feature choices for each problem area are provided demonstrating the versatility of Autofead to produce significant algorithm improvements on a wide range of problems.

  8. Injection of Contaminants into a Simulated Water Distribution System Equipped with Continuous Multi-Parameter Water Monitors

    EPA Science Inventory

    The U.S. EPA’s Technology Testing and Evaluation Program has been charged by EPA to evaluate the performance of commercially available water security-related technologies. Multi-parameter water monitors for distributions systems have been evaluated as such a water security techn...

  9. 40 CFR 264.99 - Compliance monitoring program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the availability of laboratory facilities to perform the analysis of ground-water samples. (e) The... Administrator, and repeat the analysis. If the second analysis confirms the presence of new constituents, the... Administrator within seven days after the completion of the second analysis and add them to the monitoring list...

  10. Handwriting Skills in Children with Spina Bifida: Assessment, Monitoring and Measurement.

    ERIC Educational Resources Information Center

    Hancock, Julie; Alston, Jean

    1986-01-01

    Case studies of three students with spina bifida (ages 8-11) illustrate an individualized six-week handwriting intervention program which stressed assessment, monitoring, and measurement of changes in writing performance. Appropriate changes in physical support (sitting position, writing surface, and choice of writing tool) are recommended. (JW)

  11. Performance of UNHCR nutrition programs in post-emergency refugee camps

    PubMed Central

    2011-01-01

    Background The United Nations High Commissioner for Refugees (UNHCR) launched a health information system (HIS) in 2005 to enhance quality and consistency of routine health information available in post-emergency refugee camps. This paper reviews nutrition indicators and examines their application for monitoring and evaluating the performance of UNHCR nutrition programs in more than 90 refugee camps in 18 countries. Methods The HIS is a primary source of feeding program data which is collected using standardized case definitions and reporting formats across refugee camps in multiple settings. Data was aggregated across time periods and within and across countries for analysis. Basic descriptive statistics were then compared to UNHCR program performance standards. Results Camp populations covered by the HIS ranged from 192,000 to 219,000 between 2007 and mid-2009; 87% of under five children covered by the HIS were in Africa and 13% in Asia. Average moderate acute malnutrition (MAM) and severe acute malnutrition (SAM) rates reported in 74 of 81 camps for the 2007-2009 time periods were 7.0% and 1.6%, respectively. The supplementary feeding program (SFP) admission rate was 151/1000/yr with 93% of SFP admissions occurring in Africa. SFP performance consistently exceeded all UNHCR standards with the exception of length of enrollment. Average length of SFP enrollment was 12 weeks in Africa and 22 weeks in Asia as compared to the UNHCR standard of < 8 weeks. The therapeutic feeding program (TFP) admission was 22/1000/yr with 95% of TFP admissions in Africa. TFP performance met UNHCR standards with the exception of daily weight gain. Conclusions Inclusion of children identified as moderately and severely wasted in the HIS would allow UNHCR to better track and respond to changes in nutrition status. Improved growth monitoring coverage or active malnutrition surveillance would increase UNHCR's ability to identify and treat cases of acute malnutrition. Expansion of nutrition reporting to address the transition to community-based therapeutic care is essential for adequate performance monitoring in the future. In terms of program priorities, a focus on camps and countries with large refugee populations and high feeding program enrollment rates would have the greatest impact in terms of absolute reductions in the incidence and prevalence of malnutrition. PMID:22029657

  12. 40 CFR 63.7952 - What records must I keep?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... performance tests and performance evaluations as required by § 63.10(b)(2)(viii). (4) The records of initial... your continuous monitoring system. (2) Performance evaluation plans, including previous (i.e... Section 63.7952 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS...

  13. LTPP InfoPave Q and A

    DOT National Transportation Integrated Search

    2015-12-29

    The Long-Term Pavement Performance (LTPP) program is the worlds largest pavement performance monitoring study, collecting data at 2,514 in-service highway test sections throughout the United States and Canada. The primary goal is to understand how...

  14. 49 CFR 19.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... projects can be readily quantified, such quantitative data should be related to cost data for computation... information including, when appropriate, analysis and explanation of cost overruns or high unit costs. (e... performance data from recipients. ...

  15. 43 CFR 12.951 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... readily quantified, such quantitative data should be related to cost data for computation of unit costs... including, when appropriate, analysis and explanation of cost overruns or high unit costs. (e) Recipients... performance data from recipients. ...

  16. 41 CFR 105-72.601 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... readily quantified, such quantitative data should be related to cost data for computation of unit costs... including, when appropriate, analysis and explanation of cost overruns or high unit costs. (e) Recipients... performance data from recipients. ...

  17. 22 CFR 518.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... projects can be readily quantified, such quantitative data should be related to cost data for computation... information including, when appropriate, analysis and explanation of cost overruns or high unit costs. (e... performance data from recipients. ...

  18. 7 CFR 3019.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... readily quantified, such quantitative data should be related to cost data for computation of unit costs... including, when appropriate, analysis and explanation of cost overruns or high unit costs. (e) Recipients... performance data from recipients. ...

  19. 5 CFR 1330.402 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Definitions. In this subpart— Appraisal system means the policies, practices, and procedures an agency... authority, for planning, monitoring, developing, evaluating, and rewarding employee performance. This includes appraisal systems and appraisal programs as defined at § 430.203 and performance management...

  20. U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA) ENVIRONMENTAL TECHNOLOGY VERIFICATION (ETV) PROGRAM: ARSENIC TREATMENT TECHNOLOGIES

    EPA Science Inventory

    The U.S. Environmental Protection Agency (EPA) Environmental Technology Verification (ETV) program evaluates the performance of innovative air, water, pollution prevention and monitoring technologies that have the potential to improve human health and the environment. This techn...

  1. In-service performance monitoring of a CFRP reinforced HPC bridge deck.

    DOT National Transportation Integrated Search

    2010-08-01

    The Rollins Road Bridge in Rollinsford, New Hampshire was constructed in part with funding from the FHWAs Innovative Bridge Research and Construction (IBRC) program and opened to traffic in December, 2000. A requirement of the IBRC program is the ...

  2. Advanced crew procedures development techniques

    NASA Technical Reports Server (NTRS)

    Arbet, J. D.; Benbow, R. L.; Mangiaracina, A. A.; Mcgavern, J. L.; Spangler, M. C.; Tatum, I. C.

    1975-01-01

    The development of an operational computer program, the Procedures and Performance Program (PPP), is reported which provides a procedures recording and crew/vehicle performance monitoring capability. The PPP provides real time CRT displays and postrun hardcopy of procedures, difference procedures, performance, performance evaluation, and training script/training status data. During post-run, the program is designed to support evaluation through the reconstruction of displays to any point in time. A permanent record of the simulation exercise can be obtained via hardcopy output of the display data, and via magnetic tape transfer to the Generalized Documentation Processor (GDP). Reference procedures data may be transferred from the GDP to the PPP.

  3. A Multiple Linear Regression Model for Predicting Zone A Retention by Military Occupational Specialty.

    DTIC Science & Technology

    1986-09-01

    OF REPORT Approved for public release; distribution 2b DECLASSIFICATION /DOWNGRADING SCHEDULE is unlimited. 4 PERFORMING ORGANIZATION REPORT NUMBER(S...S MONITORING ORGANIZATION REPORT NUMBER(S) 6a NAME OF PERFORMING ORGANIZATION 6b OFFICE SYMBOL 7a. NAME OF MONITORING ORGANIZATION (If applicable...ORGAIZATION (If applicable) 8c ADDRESS(Ciry, State, ard ZIPCode) 10 SOURCE OF FUNDING NUMBERS PROGRAM PROJECT TASK WORK UNIT ELEMENT NO INO NO ACCESSION

  4. Constraints on the Grueneisen Theory

    DTIC Science & Technology

    2007-02-01

    Constraints on the Grüneisen Theory 5c. PROGRAM ELEMENT NUMBER 5d. PROJECT NUMBER AH80 5e. TASK NUMBER 6. AUTHOR( S ) Steven B. Segletes 5f...WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) U.S. Army Research Laboratory ATTN: AMSRD-ARL-WM-TD Aberdeen Proving Ground...MD 21005-5069 8. PERFORMING ORGANIZATION REPORT NUMBER ARL-TR-4041 10. SPONSOR/MONITOR’S ACRONYM( S ) 9. SPONSORING/MONITORING AGENCY NAME

  5. Drainage Monitoring and Evaluation

    DTIC Science & Technology

    2011-01-01

    CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING...ORGANIZATION NAME( S ) AND ADDRESS(ES) U. S . Army Corps of Engineers,Omaha District ,1616 Capitol Ave,Omaha,NE,98102 8. PERFORMING ORGANIZATION REPORT...NUMBER 9. SPONSORING/MONITORING AGENCY NAME( S ) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM( S ) 11. SPONSOR/MONITOR’S REPORT NUMBER( S ) 12

  6. A concept for performance management for Federal science programs

    USGS Publications Warehouse

    Whalen, Kevin G.

    2017-11-06

    The demonstration of clear linkages between planning, funding, outcomes, and performance management has created unique challenges for U.S. Federal science programs. An approach is presented here that characterizes science program strategic objectives by one of five “activity types”: (1) knowledge discovery, (2) knowledge development and delivery, (3) science support, (4) inventory and monitoring, and (5) knowledge synthesis and assessment. The activity types relate to performance measurement tools for tracking outcomes of research funded under the objective. The result is a multi-time scale, integrated performance measure that tracks individual performance metrics synthetically while also measuring progress toward long-term outcomes. Tracking performance on individual metrics provides explicit linkages to root causes of potentially suboptimal performance and captures both internal and external program drivers, such as customer relations and science support for managers. Functionally connecting strategic planning objectives with performance measurement tools is a practical approach for publicly funded science agencies that links planning, outcomes, and performance management—an enterprise that has created unique challenges for public-sector research and development programs.

  7. Impact of a monitored program of care on incidence of ventilator-associated pneumonia: results of a longterm performance-improvement project.

    PubMed

    Weireter, Leonard J; Collins, J N; Britt, Rebecca C; Reed, Scott F; Novosel, T J; Britt, L D

    2009-05-01

    Ventilator-associated pneumonia (VAP) remains a major source of morbidity, mortality, and expense in the ICU despite therapies directed against it. A retrospective review of a prospectively developed performance-improvement project monitoring the incidence of VAP in two adjacent ICUs was conducted. In response to an excessive VAP rate, weekly multidisciplinary team meetings were instituted to review data, develop care protocols, and modify care routines. Protocol compliance was monitored daily and feedback provided weekly to the care teams. VAP rates were determined by the institutional Infection Control Committee and reviewed monthly with the ICU multidisciplinary team. Duration of the investigational period was 10 years. A standardized ventilator-weaning protocol was instituted with confirmed 95% use. Additional modifications of care, such as patient positioning, use of specific endotracheal tubes to minimize aspiration of supraglottic secretions, an oral-care regimen, and aggressive antibiotic stewardship were standardized, with a compliance rate >90%. VAP rates dropped from 12.8 per 1,000 patient-days in 1998 to 1.1 in 2007 in the burn trauma ICU and from 21.2 to <1 in the neurotrauma ICU in the same time frame. Also, mean ventilator length of stay decreased from 6 days to 4.2 and from 5.8 days to 4.75 simultaneously in the respective ICUs. Such performance improvement has been sustained since implementation of the program. A systematic, monitored program of standardized care protocols can markedly reduce VAP rate in the ICU.

  8. Evaluating success criteria and project monitoring in river enhancement within an adaptive management framework

    USGS Publications Warehouse

    O'Donnell, T. K.; Galat, D.L.

    2008-01-01

    Objective setting, performance measures, and accountability are important components of an adaptive-management approach to river-enhancement programs. Few lessons learned by river-enhancement practitioners in the United States have been documented and disseminated relative to the number of projects implemented. We conducted scripted telephone surveys with river-enhancement project managers and practitioners within the Upper Mississippi River Basin (UMRB) to determine the extent of setting project success criteria, monitoring, evaluation of monitoring data, and data dissemination. Investigation of these elements enabled a determination of those that inhibited adaptive management. Seventy river enhancement projects were surveyed. Only 34% of projects surveyed incorporated a quantified measure of project success. Managers most often relied on geophysical attributes of rivers when setting project success criteria, followed by biological communities. Ninety-one percent of projects that performed monitoring included biologic variables, but the lack of data collection before and after project completion and lack of field-based reference or control sites will make future assessments of ecologic success difficult. Twenty percent of projects that performed monitoring evaluated ???1 variable but did not disseminate their evaluations outside their organization. Results suggest greater incentives may be required to advance the science of river enhancement. Future river-enhancement programs within the UMRB and elsewhere can increase knowledge gained from individual projects by offering better guidance on setting success criteria before project initiation and evaluation through established monitoring protocols. ?? 2007 Springer Science+Business Media, LLC.

  9. The LTS timing analysis program :

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Armstrong, Darrell Jewell; Schwarz, Jens

    The LTS Timing Analysis program described in this report uses signals from the Tempest Lasers, Pulse Forming Lines, and Laser Spark Detectors to carry out calculations to quantify and monitor the performance of the the Z-Accelerators laser triggered SF6 switches. The program analyzes Z-shots beginning with Z2457, when Laser Spark Detector data became available for all lines.

  10. 40 CFR 60.2725 - May I conduct a repeat performance test to establish new operating limits?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emissions Guidelines and Compliance Times for Commercial and Industrial Solid Waste Incineration Units Model... during any performance test used to demonstrate compliance. Model Rule—Monitoring ...

  11. 40 CFR 60.2725 - May I conduct a repeat performance test to establish new operating limits?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emissions Guidelines and Compliance Times for Commercial and Industrial Solid Waste Incineration Units Model... during any performance test used to demonstrate compliance. Model Rule—Monitoring ...

  12. An investment benefiting America's highways : the long term pavement performance program

    DOT National Transportation Integrated Search

    2000-01-01

    The Federal Highway Administration (FHWA) and the States, beginning in 1978, jointly developed and implemented a continuous data collection system called the Highway Performance Monitoring System (HPMS). Currently, the HPMS contains over 110,000 high...

  13. Long term pavement performance computed parameter : moisture content

    DOT National Transportation Integrated Search

    2008-01-01

    A study was conducted to compute in situ soil parameters based on time domain reflectometry (TDR) traces obtained from Long Term Pavement Performance (LTPP) test sections instrumented for the seasonal monitoring program (SMP). Ten TDR sensors were in...

  14. 14 CFR 1260.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... quantitative data should be related to cost data for computation of unit costs. (2) Reasons why established..., analysis and explanation of cost overruns or high unit costs. (e) Recipients shall not be required to... performance data from recipients. ...

  15. An Examination of an Early Intervention Reading Program Focusing on the Progress Monitoring of Literacy Skills and the Reading Self-Concepts of Struggling Readers

    ERIC Educational Resources Information Center

    Samuelson, Teresa C.

    2010-01-01

    The purpose of this study was to examine progress monitoring, reading self-concept, and the literacy skills of first and second grade struggling readers. Progress monitoring is an instructional process used by teachers to assess students' academic performance on a regular basis, typically weekly or monthly. When based on the skill level of the…

  16. 34 CFR 75.720 - Financial and performance reports.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... performance) and 34 CFR 74.52 (Financial reporting); and (2) 34 CFR 80.40 (Monitoring and reporting program performance) and 34 CFR 80.41 (Financial reporting). (b) A grantee shall submit these reports annually, unless... 34 Education 1 2010-07-01 2010-07-01 false Financial and performance reports. 75.720 Section 75...

  17. Active Sites Environmental Monitoring Program: Mid-FY 1991 report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashwood, T.L.; Wickliff, D.S.; Morrissey, C.M.

    1991-10-01

    This report summarizes the activities of the Active Sites Environmental Monitoring Program (ASEMP) from October 1990 through March 1991. The ASEMP was established in 1989 by Solid Waste Operations and the Environmental Sciences Division to provide early detection and performance monitoring at active low-level radioactive waste (LLW) disposal sites in Solid Waste Storage Area (SWSA) 6 and transuranic (TRU) waste storage sites in SWSA 5 as required by chapters II and III of US Department of Energy Order 5820.2A. Monitoring results continue to demonstrate the no LLW is being leached from the storage vaults on the tumulus pads. Loading ofmore » vaults on Tumulus II began during this reporting period and 115 vaults had been loaded by the end of March 1991.« less

  18. Dynamics behind the scale up of evidence-based obesity prevention: protocol for a multi-site case study of an electronic implementation monitoring system in health promotion practice.

    PubMed

    Conte, Kathleen P; Groen, Sisse; Loblay, Victoria; Green, Amanda; Milat, Andrew; Persson, Lina; Innes-Hughes, Christine; Mitchell, Jo; Thackway, Sarah; Williams, Mandy; Hawe, Penelope

    2017-12-06

    The effectiveness of many interventions to promote health and prevent disease has been well established. The imperative has therefore shifted from amassing evidence about efficacy to scale-up to maximise population-level health gains. Electronic implementation monitoring, or 'e-monitoring', systems have been designed to assist and track the delivery of preventive policies and programs. However, there is little evidence on whether e-monitoring systems improve the dissemination, adoption, and ongoing delivery of evidence-based preventive programs. Also, given considerable difficulties with e-monitoring systems in the clinical sector, scholars have called for a more sophisticated re-examination of e-monitoring's role in enhancing implementation. In the state of New South Wales (NSW), Australia, the Population Health Information Management System (PHIMS) was created to support the dissemination of obesity prevention programs to 6000 childcare centres and elementary schools across all 15 local health districts. We have established a three-way university-policymaker-practice research partnership to investigate the impact of PHIMS on practice, how PHIMS is used, and how achievement of key performance indicators of program adoption may be associated with local contextual factors. Our methods encompass ethnographic observation, key informant interviews and participatory workshops for data interpretation at a state and local level. We use an on-line social network analysis of the collaborative relationships across local health district health promotion teams to explore the relationship between PHIMS use and the organisational structure of practice. Insights will be sensitised by institutional theory, practice theory and complex adaptive system thinking, among other theories which make sense of socio-technical action. Our working hypothesis is that the science of getting evidence-based programs into practice rests on an in-depth understanding of the role they play in the on-going system of local relationships and multiple accountabilities. Data will be synthesised to produce a typology to characterise local context, PHIMS use and key performance indicator achievement (of program implementation) across the 15 local health districts. Results could be used to continuously align e-monitoring technologies within quality improvement processes to ensure that such technologies enhance practice and innovation. A partnership approach to knowledge production increases the likelihood that findings will be put into practice.

  19. Iraq liquid radioactive waste tanks maintenance and monitoring program plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dennis, Matthew L.; Cochran, John Russell; Sol Shamsaldin, Emad

    2011-10-01

    The purpose of this report is to develop a project management plan for maintaining and monitoring liquid radioactive waste tanks at Iraq's Al-Tuwaitha Nuclear Research Center. Based on information from several sources, the Al-Tuwaitha site has approximately 30 waste tanks that contain varying amounts of liquid or sludge radioactive waste. All of the tanks have been non-operational for over 20 years and most have limited characterization. The program plan embodied in this document provides guidance on conducting radiological surveys, posting radiation control areas and controlling access, performing tank hazard assessments to remove debris and gain access, and conducting routine tankmore » inspections. This program plan provides general advice on how to sample and characterize tank contents, and how to prioritize tanks for soil sampling and borehole monitoring.« less

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Angers, Crystal Plume; Bottema, Ryan; Buckley, Les

    Purpose: Treatment unit uptime statistics are typically used to monitor radiation equipment performance. The Ottawa Hospital Cancer Centre has introduced the use of Quality Control (QC) test success as a quality indicator for equipment performance and overall health of the equipment QC program. Methods: Implemented in 2012, QATrack+ is used to record and monitor over 1100 routine machine QC tests each month for 20 treatment and imaging units ( http://qatrackplus.com/ ). Using an SQL (structured query language) script, automated queries of the QATrack+ database are used to generate program metrics such as the number of QC tests executed and themore » percentage of tests passing, at tolerance or at action. These metrics are compared against machine uptime statistics already reported within the program. Results: Program metrics for 2015 show good correlation between pass rate of QC tests and uptime for a given machine. For the nine conventional linacs, the QC test success rate was consistently greater than 97%. The corresponding uptimes for these units are better than 98%. Machines that consistently show higher failure or tolerance rates in the QC tests have lower uptimes. This points to either poor machine performance requiring corrective action or to problems with the QC program. Conclusions: QATrack+ significantly improves the organization of QC data but can also aid in overall equipment management. Complimenting machine uptime statistics with QC test metrics provides a more complete picture of overall machine performance and can be used to identify areas of improvement in the machine service and QC programs.« less

  1. A Concise Physical Interpretation of Several Analytical Grueneisen Formulations

    DTIC Science & Technology

    2006-08-01

    Formulations 5c. PROGRAM ELEMENT NUMBER 5d. PROJECT NUMBER AH80 5e. TASK NUMBER 6. AUTHOR( S ) Steven B. Segletes 5f. WORK UNIT NUMBER 7...PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) U.S. Army Research Laboratory ATTN: AMSRD-ARL-WM-TD Aberdeen Proving Ground, MD 21005-5069 8...PERFORMING ORGANIZATION REPORT NUMBER ARL-TR-3881 10. SPONSOR/MONITOR’S ACRONYM( S ) 9. SPONSORING/MONITORING AGENCY NAME( S ) AND ADDRESS(ES) 11

  2. Modeling the Penetration Behavior of Rigid Into Ballistic Gelatin

    DTIC Science & Technology

    2008-03-01

    PROGRAM ELEMENT NUMBER 5d. PROJECT NUMBER AH80 5e. TASK NUMBER 6. AUTHOR( S ) Steven B. Segletes 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION...NAME( S ) AND ADDRESS(ES) U.S. Army Research Laboratory ATTN: AMSRD-ARL-WM-TC Aberdeen Proving Ground, MD 21005-5069 8. PERFORMING ORGANIZATION...REPORT NUMBER ARL-TR-4393 10. SPONSOR/MONITOR’S ACRONYM( S ) 9. SPONSORING/MONITORING AGENCY NAME( S ) AND ADDRESS(ES) 11. SPONSOR/MONITOR’S

  3. Analysis of Erosion Transition in Tungsten-Alloy Rods into Aluminum Targets

    DTIC Science & Technology

    2004-03-01

    PROGRAM ELEMENT NUMBER 5d. PROJECT NUMBER AH80 5e. TASK NUMBER 6. AUTHOR( S ) Steven B. Segletes 5f. WORK UNIT NUMBER 7. PERFORMING...ORGANIZATION NAME( S ) AND ADDRESS(ES) U.S. Army Research Laboratory ATTN: AMSRD-ARL-WM-TD Aberdeen Proving Ground, MD 21005-5066 8. PERFORMING...ORGANIZATION REPORT NUMBER ARL-TR-3153 10. SPONSOR/MONITOR’S ACRONYM( S ) 9. SPONSORING/MONITORING AGENCY NAME( S ) AND ADDRESS(ES) 11. SPONSOR

  4. Comparison of the performance of the activPAL Professional physical activity logger to a discrete accelerometer-based activity monitor.

    PubMed

    Godfrey, A; Culhane, K M; Lyons, G M

    2007-10-01

    The aim of this study was to assess the accuracy of the 'activPAL Professional' physical activity logger by comparing its output to that of a proven discrete accelerometer-based activity monitor during extended measurements on healthy subjects while performing activities of daily living (ADL). Ten healthy adults, with unrestricted mobility, wore both the activPAL and the discrete dual accelerometer (Analog Devices ADXL202)-based activity monitor that recorded in synchronization with each other. The accelerometer derived data were then compared to that generated by the activPAL and a complete statistical and error analysis was performed using a Matlab program. This program determined trunk and thigh inclination angles to distinguish between sitting/lying, standing and stepping for the discrete accelerometer device and amount of time spent on each activity. Analysis was performed on a second-by-second basis and then categorized at 15s intervals in direct comparison with the activPAL generated data. Of the total time monitored (approximately 60 h) the detection accuracies for static and dynamic activities were approximately 98%. In a population of healthy adults, the data obtained from the activPAL Professional physical activity logger for both static and dynamic activities showed a close match to a proven discrete accelerometer data with an offset of approximately 2% between the two systems.

  5. Quarterly Performance/Technical Report of the National Marrow Donor Program

    DTIC Science & Technology

    2009-02-10

    and epitope level matching for HLA-DPB1. Submitted. o Z Shamim , L Ryder, M Haagenson , S Spellman, T Wang, S Lee, K Müller. Polymorphism in the...3, 4 6. AUTHOR( S ) Setterholm, Michelle 5f. WORK UNIT NUMBER N/A 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) National Marrow Donor...Program 3001 Broadway St., N.E., Ste. 500 Minneapolis, MN 55413 8. PERFORMING ORGANIZATION REPORT NUMBER N/A 10. SPONSOR/MONITOR’S ACRONYM( S ) ONR 9

  6. Rapid Assessment of the ED Institutional Eligibility and Compliance Monitoring Systems. Final Report.

    ERIC Educational Resources Information Center

    Jung, Steven M.

    Two U.S. Department of Education (ED) systems for establishing the initial eligibility and monitoring the performance of postsecondary institutions that participate in ED financial assistance programs were assessed. The evaluation was designed to describe and evaluate the eligibility and certification functions of ED's Eligibility and Agency…

  7. 40 CFR 60.5225 - What are the monitoring and calibration requirements for compliance with my operating limits?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... limited to the following: (i) Inspecting the fabric filter for air leaks, torn or broken bags or filter... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY... maintain your bag leak detection system in continuous operation according to your monitoring plan required...

  8. 40 CFR 60.5225 - What are the monitoring and calibration requirements for compliance with my operating limits?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... limited to the following: (i) Inspecting the fabric filter for air leaks, torn or broken bags or filter... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY... maintain your bag leak detection system in continuous operation according to your monitoring plan required...

  9. 40 CFR 62.15215 - What is required for my continuous opacity monitoring system and how are the data used?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... initial evaluation of your continuous opacity monitoring system according to Performance Specification 1 in appendix B of 40 CFR part 60. Complete this evaluation by 180 days after your final compliance... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS...

  10. 24 CFR 1000.26 - What are the administrative requirements under NAHASDA?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... recipient of a cash escrow of not less than 20 percent of the total contract price, subject to reduction... monitoring of disbursements by the contractor. (12) Section 85.37, “Subgrants.” (13) Section 85.40, “Monitoring and reporting program performance,” except paragraphs (b) through (d) and paragraph (f). (14...

  11. Akamai Internship Program

    DTIC Science & Technology

    2015-04-17

    AFRL-OSR-VA-TR-2015-0094 AKAMAI INTERNSHIP PROGRAM Lisa Hunter UNIVERSITY OF HAWAII SYSTEMS Final Report 04/17/2015 DISTRIBUTION A: Distribution...NUMBER n/a 5f. WORK UNIT NUMBER n/a 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) University of Hawaii Systems 2530 Dole St. SAK D-200...Honolulu, HI 96822-2309 8. PERFORMING ORGANIZATION REPORT NUMBER n/a 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) University of

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rainer, Leo I.; Hoeschele, Marc A.; Apte, Michael G.

    This report addresses the results of detailed monitoring completed under Program Element 6 of Lawrence Berkeley National Laboratory's High Performance Commercial Building Systems (HPCBS) PIER program. The purpose of the Energy Simulations and Projected State-Wide Energy Savings project is to develop reasonable energy performance and cost models for high performance relocatable classrooms (RCs) across California climates. A key objective of the energy monitoring was to validate DOE2 simulations for comparison to initial DOE2 performance projections. The validated DOE2 model was then used to develop statewide savings projections by modeling base case and high performance RC operation in the 16 Californiamore » climate zones. The primary objective of this phase of work was to utilize detailed field monitoring data to modify DOE2 inputs and generate performance projections based on a validated simulation model. Additional objectives include the following: (1) Obtain comparative performance data on base case and high performance HVAC systems to determine how they are operated, how they perform, and how the occupants respond to the advanced systems. This was accomplished by installing both HVAC systems side-by-side (i.e., one per module of a standard two module, 24 ft by 40 ft RC) on the study RCs and switching HVAC operating modes on a weekly basis. (2) Develop projected statewide energy and demand impacts based on the validated DOE2 model. (3) Develop cost effectiveness projections for the high performance HVAC system in the 16 California climate zones.« less

  13. Do growth monitoring and promotion programs answer the performance criteria of a screening program? A critical analysis based on a systematic review.

    PubMed

    Roberfroid, D; Kolsteren, P; Hoerée, T; Maire, B

    2005-11-01

    Growth Monitoring and Promotion programs (GMP) have been intensively promoted to improve children's health in developing countries. It has been hoped that regularly weighing children would result in the early detection of growth falterers, and that the growth chart would serve as an educational tool to make that state apparent to both health workers and caretakers in order to trigger improved caring practices. Our objective was to review whether GMP answers the theoretical grounds of a screening and intervention program. A systematic literature review was performed. The WHO framework developed by Wilson and Jungner for planning and evaluating screening programs guided the analysis. Sixty-nine studies were retrieved. Overall, evidence is weak on the performance of GMP as a screening program for malnutrition through early detection of growth falterers. The main results are: (1) malnutrition remains a public health problem, but its importance is context specific; (2) the value of a low weight velocity to predict malnutrition is unknown and likely to vary in different contexts; (3) the performance of GMP for improving nutrition status of children and in reducing mortality and morbidity is unknown; (4) the performance of the screening is affected by the unreliability of weight measurements; (5) the promotional and educational effectiveness of GMP is low, in particular the growth chart is poorly understood by mothers; (6) the acceptability seems low in regards of low attendance rates; (7) evidence is lacking regarding cost-effectiveness. We conclude that there is too little scientific evidence to indiscriminately support international promotion of GMP. However GMP could constitute a valid strategy of public nutrition in specific situations. We indicate paths for further research and how prevention programs could be developed.

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elvado Environmental LLC

    This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2009 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2009 will be in accordance with DOE Order 540.1 requirements and the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contamination andmore » determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2009 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation. Modifications to the CY 2009 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2009 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3; sample collection methods and procedures are described in Section 4; and Section 5 lists the documents cited for more detailed operational and technical information.« less

  15. 45 CFR 2543.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... Whenever appropriate and the output of programs or projects can be readily quantified, such quantitative data should be related to cost data for computation of unit costs. (2) Reasons why established goals were not met, if appropriate. (3) Other pertinent information including, when appropriate, analysis and...

  16. 40 CFR 35.3570 - Reports and audits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... on-site visits as deemed necessary to perform the annual review. (d) Information management system—(1) Purpose. The purpose of the information management system is to assess the DWSRF programs, to monitor.... Information provided in the Biennial Report on other EPA programs eligible for assistance from the DWSRF...

  17. 40 CFR 35.3570 - Reports and audits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... on-site visits as deemed necessary to perform the annual review. (d) Information management system—(1) Purpose. The purpose of the information management system is to assess the DWSRF programs, to monitor.... Information provided in the Biennial Report on other EPA programs eligible for assistance from the DWSRF...

  18. 40 CFR 35.3570 - Reports and audits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... on-site visits as deemed necessary to perform the annual review. (d) Information management system—(1) Purpose. The purpose of the information management system is to assess the DWSRF programs, to monitor.... Information provided in the Biennial Report on other EPA programs eligible for assistance from the DWSRF...

  19. 40 CFR 35.3570 - Reports and audits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... on-site visits as deemed necessary to perform the annual review. (d) Information management system—(1) Purpose. The purpose of the information management system is to assess the DWSRF programs, to monitor.... Information provided in the Biennial Report on other EPA programs eligible for assistance from the DWSRF...

  20. 40 CFR 35.3570 - Reports and audits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... on-site visits as deemed necessary to perform the annual review. (d) Information management system—(1) Purpose. The purpose of the information management system is to assess the DWSRF programs, to monitor.... Information provided in the Biennial Report on other EPA programs eligible for assistance from the DWSRF...

  1. 45 CFR 74.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... two copies of performance reports. (f) Recipients shall immediately notify the HHS awarding agency of... UNIFORM ADMINISTRATIVE REQUIREMENTS FOR AWARDS AND SUBAWARDS TO INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NONPROFIT ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Reports and...

  2. 45 CFR 74.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... two copies of performance reports. (f) Recipients shall immediately notify the HHS awarding agency of... UNIFORM ADMINISTRATIVE REQUIREMENTS FOR AWARDS AND SUBAWARDS TO INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NONPROFIT ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Reports and...

  3. 45 CFR 74.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... two copies of performance reports. (f) Recipients shall immediately notify the HHS awarding agency of... UNIFORM ADMINISTRATIVE REQUIREMENTS FOR AWARDS AND SUBAWARDS TO INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NONPROFIT ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Reports and...

  4. 45 CFR 74.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... two copies of performance reports. (f) Recipients shall immediately notify the HHS awarding agency of... UNIFORM ADMINISTRATIVE REQUIREMENTS FOR AWARDS AND SUBAWARDS TO INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NONPROFIT ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Reports and...

  5. 36 CFR 1210.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... quantitative data should be related to cost data for computation of unit costs. (2) Reasons why established..., analysis and explanation of cost overruns or high unit costs. (e) Recipients shall not be required to... requesting performance data from recipients. ...

  6. Improving oversight of the graduate medical education enterprise: one institution's strategies and tools.

    PubMed

    Afrin, Lawrence B; Arana, George W; Medio, Franklin J; Ybarra, Angela F N; Clarke, Harry S

    2006-05-01

    Accreditation organizations, financial stakeholders, legal systems, and regulatory agencies have increased the need for accountability in educational processes and curricular outcomes of graduate medical education. This demand for greater programmatic monitoring has placed pressure on institutions with graduate medical education (GME) programs to develop greater oversight of these programs. Meeting these challenges requires development of new GME management strategies and tools for institutional GME administrators to scrutinize programs, while still allowing these programs the autonomy to develop and implement educational methods to meet their unique training needs. At the Medical University of South Carolina (MUSC), senior administrators in the college of medicine felt electronic information management was a critical strategy for success and thus proceeded to carefully select an electronic residency management system (ERMS) to provide functionality for both individual programs and the GME enterprise as a whole. Initial plans in 2002 for a phased deployment had to be changed to a much more rapid deployment due to regulatory issues. Extensive communication and cooperation among MUSC's GME leaders resulted in a successful deployment in 2003. Evaluation completion rates have substantially improved, duty hours are carefully monitored, patient safety has improved through more careful oversight of residents' procedural privileges, regulators have been pleased, and central GME administrative visibility of program performance has dramatically improved. The system is now being expanded to MUSC's medical school and other health professions colleges. The authors discuss lessons learned and opportunities and challenges ahead, which include improving tracking of development of procedural competency, establishing and monitoring program performance standards, and integrating the ERMS with GME reimbursement systems.

  7. Optimization of Sensor Monitoring Strategies for Emissions

    NASA Astrophysics Data System (ADS)

    Klise, K. A.; Laird, C. D.; Downey, N.; Baker Hebert, L.; Blewitt, D.; Smith, G. R.

    2016-12-01

    Continuous or regularly scheduled monitoring has the potential to quickly identify changes in air quality. However, even with low-cost sensors, only a limited number of sensors can be placed to monitor airborne pollutants. The physical placement of these sensors and the sensor technology used can have a large impact on the performance of a monitoring strategy. Furthermore, sensors can be placed for different objectives, including maximum coverage, minimum time to detection or exposure, or to quantify emissions. Different objectives may require different monitoring strategies, which need to be evaluated by stakeholders before sensors are placed in the field. In this presentation, we outline methods to enhance ambient detection programs through optimal design of the monitoring strategy. These methods integrate atmospheric transport models with sensor characteristics, including fixed and mobile sensors, sensor cost and failure rate. The methods use site specific pre-computed scenarios which capture differences in meteorology, terrain, concentration averaging times, gas concentration, and emission characteristics. The pre-computed scenarios become input to a mixed-integer, stochastic programming problem that solves for sensor locations and types that maximize the effectiveness of the detection program. Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000.

  8. Automated Instrumentation, Monitoring and Visualization of PVM Programs Using AIMS

    NASA Technical Reports Server (NTRS)

    Mehra, Pankaj; VanVoorst, Brian; Yan, Jerry; Lum, Henry, Jr. (Technical Monitor)

    1994-01-01

    We present views and analysis of the execution of several PVM (Parallel Virtual Machine) codes for Computational Fluid Dynamics on a networks of Sparcstations, including: (1) NAS Parallel Benchmarks CG and MG; (2) a multi-partitioning algorithm for NAS Parallel Benchmark SP; and (3) an overset grid flowsolver. These views and analysis were obtained using our Automated Instrumentation and Monitoring System (AIMS) version 3.0, a toolkit for debugging the performance of PVM programs. We will describe the architecture, operation and application of AIMS. The AIMS toolkit contains: (1) Xinstrument, which can automatically instrument various computational and communication constructs in message-passing parallel programs; (2) Monitor, a library of runtime trace-collection routines; (3) VK (Visual Kernel), an execution-animation tool with source-code clickback; and (4) Tally, a tool for statistical analysis of execution profiles. Currently, Xinstrument can handle C and Fortran 77 programs using PVM 3.2.x; Monitor has been implemented and tested on Sun 4 systems running SunOS 4.1.2; and VK uses XIIR5 and Motif 1.2. Data and views obtained using AIMS clearly illustrate several characteristic features of executing parallel programs on networked workstations: (1) the impact of long message latencies; (2) the impact of multiprogramming overheads and associated load imbalance; (3) cache and virtual-memory effects; and (4) significant skews between workstation clocks. Interestingly, AIMS can compensate for constant skew (zero drift) by calibrating the skew between a parent and its spawned children. In addition, AIMS' skew-compensation algorithm can adjust timestamps in a way that eliminates physically impossible communications (e.g., messages going backwards in time). Our current efforts are directed toward creating new views to explain the observed performance of PVM programs. Some of the features planned for the near future include: (1) ConfigView, showing the physical topology of the virtual machine, inferred using specially formatted IP (Internet Protocol) packets: and (2) LoadView, synchronous animation of PVM-program execution and resource-utilization patterns.

  9. FutureGen 2.0 Monitoring Program: An Overview of the Monitoring Approach and Technologies Selected for Implementation

    DOE PAGES

    Vermeul, Vince R.; Strickland, Chris E.; Thorne, Paul D.; ...

    2014-12-31

    The FutureGen 2.0 Project will design and build a first-of-its-kind, near-zero emissions coal-fueled power plant with carbon capture and storage (CCS). To assess storage site performance and meet the regulatory requirements of the Class VI Underground Injection Control (UIC) Program for CO2 Geologic Sequestration, the FutureGen 2.0 project will implement a suite of monitoring technologies designed to 1) evaluate CO2 mass balance and 2) detect any unforeseen loss in CO2 containment. The monitoring program will include direct monitoring of the injection stream and reservoir, and early-leak-detection monitoring directly above the primary confining zone. It will also implement an adaptive monitoringmore » strategy whereby monitoring results are continually evaluated and the monitoring network is modified as required, including the option to drill additional wells in out-years. Wells will be monitored for changes in CO2 concentration and formation pressure, and other geochemical/isotopic signatures that provide indication of CO2 or brine leakage. Indirect geophysical monitoring technologies that were selected for implementation include passive seismic, integrated surface deformation, time-lapse gravity, and pulsed neutron capture logging. Near-surface monitoring approaches that have been initiated include surficial aquifer and surface- water monitoring, soil-gas monitoring, atmospheric monitoring, and hyperspectral data acquisition for assessment of vegetation conditions. Initially, only the collection of baseline data sets is planned; the need for additional near- surface monitoring will be continually evaluated throughout the design and operational phases of the project, and selected approaches may be reinstituted if conditions warrant. Given the current conceptual understanding of the subsurface environment, early and appreciable impacts to near-surface environments are not expected.« less

  10. Looking inside the Ocean: Toward an Autonomous Imaging System for Monitoring Gelatinous Zooplankton

    PubMed Central

    Corgnati, Lorenzo; Marini, Simone; Mazzei, Luca; Ottaviani, Ennio; Aliani, Stefano; Conversi, Alessandra; Griffa, Annalisa

    2016-01-01

    Marine plankton abundance and dynamics in the open and interior ocean is still an unknown field. The knowledge of gelatinous zooplankton distribution is especially challenging, because this type of plankton has a very fragile structure and cannot be directly sampled using traditional net based techniques. To overcome this shortcoming, Computer Vision techniques can be successfully used for the automatic monitoring of this group.This paper presents the GUARD1 imaging system, a low-cost stand-alone instrument for underwater image acquisition and recognition of gelatinous zooplankton, and discusses the performance of three different methodologies, Tikhonov Regularization, Support Vector Machines and Genetic Programming, that have been compared in order to select the one to be run onboard the system for the automatic recognition of gelatinous zooplankton. The performance comparison results highlight the high accuracy of the three methods in gelatinous zooplankton identification, showing their good capability in robustly selecting relevant features. In particular, Genetic Programming technique achieves the same performances of the other two methods by using a smaller set of features, thus being the most efficient in avoiding computationally consuming preprocessing stages, that is a crucial requirement for running on an autonomous imaging system designed for long lasting deployments, like the GUARD1. The Genetic Programming algorithm has been installed onboard the system, that has been operationally tested in a two-months survey in the Ligurian Sea, providing satisfactory results in terms of monitoring and recognition performances. PMID:27983638

  11. Preliminary Design Program: Vapor Compression Distillation Flight Experiment Program

    NASA Technical Reports Server (NTRS)

    Schubert, F. H.; Boyda, R. B.

    1995-01-01

    This document provides a description of the results of a program to prepare a preliminary design of a flight experiment to demonstrate the function of a Vapor Compression Distillation (VCD) Wastewater Processor (WWP) in microgravity. This report describes the test sequence to be performed and the hardware, control/monitor instrumentation and software designs prepared to perform the defined tests. the purpose of the flight experiment is to significantly reduce the technical and programmatic risks associated with implementing a VCD-based WWP on board the International Space Station Alpha.

  12. TI-59 PROGRAMMABLE CALCULATOR PROGRAMS FOR IN-STACK OPACITY, VENTURI SCRUBBERS, AND ELECTROSTATIC PRECIPITATORS

    EPA Science Inventory

    The report explains the basic concepts of in-stack opacity as measured by in-stack opacity monitors. Also included are calculator programs that model the performance of venturi scrubbers and electrostatic precipitators. The effect of particulate control devices on in-stack opacit...

  13. 77 FR 47851 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-10

    ... Collection: Minimum Data Set for Medicaid Incentives for Prevention of Chronic Diseases Program Grantees; Use... collection, the MIPCD Minimum Data Set (MDS), is intended to collect data for program performance monitoring and evaluation. The MDS is a secondary data collection that assembles information already collected by...

  14. 77 FR 64343 - Agency Information Collection Activities: Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-19

    ... Information Collection Request: New collection; Title of Information Collection: Minimum Data Set for Medicaid... National Registry of Evidence-Based Programs. The proposed information collection, the MIPCD Minimum Data Set (MDS), is intended to collect data for program performance monitoring and evaluation. The MDS is a...

  15. 10 CFR 600.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... appropriate and the output of programs or projects can be readily quantified, such quantitative data should be related to cost data for computation of unit costs. (2) Reasons why established goals were not met, if appropriate. (3) Other pertinent information including, when appropriate, analysis and explanation of cost...

  16. 22 CFR 145.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... appropriate and the output of programs or projects can be readily quantified, such quantitative data should be related to cost data for computation of unit costs. (2) Reasons why established goals were not met, if appropriate. (3) Other pertinent information including, when appropriate, analysis and explanation of cost...

  17. 40 CFR 30.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... appropriate and the output of programs or projects can be readily quantified, such quantitative data should be related to cost data for computation of unit costs. (2) Reasons why established goals were not met, if appropriate. (3) Other pertinent information including, when appropriate, analysis and explanation of cost...

  18. 40 CFR 31.40 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... performance. 31.40 Section 31.40 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND COOPERATIVE AGREEMENTS TO STATE AND LOCAL GOVERNMENTS Post-Award Requirements Reports, Records, Retention, and Enforcement § 31.40...

  19. In-Vehicle Safety Advisory And Warning System (Ivsaws), Volume V: Appendices L Through V

    DOT National Transportation Integrated Search

    1999-09-01

    To better understand the environmental factors and their effects on pavement performance, the Long Term Pavement Performance (LTPP) Seasonal Monitoring Program (SMP) was initiated during 1992. Sixty-four LTPP pavement sections were identified to be i...

  20. PERFORMANCE VERIFICATION OF ADVANCED MONITORING SYSTEMS FOR AIR, WATER, AND SOIL

    EPA Science Inventory

    The Environmental Technology Verification (ETV) Program, beginning as an initiative of the U.S. Environmental Protection Agency (EPA) in 1995, verifies the performance of commercially available, innovative technologies that can be used to assess environmental quality. The ETV p...

  1. Atomistic Simulations of Intersection Cross-Slip Nucleation in Ll2 Ni3Al (Preprint)

    DTIC Science & Technology

    2011-11-01

    CROSS-SLIP NUCLEATION IN Ll2 Ni3Al (Preprint) 5a. CONTRACT NUMBER IN-HOUSE 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 62102F 6. AUTHOR( S ...PROJECT NUMBER 4347 5e. TASK NUMBER 20 5f. WORK UNIT NUMBER LM121100 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) 8. PERFORMING...SPONSORING/MONITORING AGENCY NAME( S ) AND ADDRESS(ES) 10. SPONSORING/MONITORING AGENCY ACRONYM( S ) Air Force Research Laboratory Materials and

  2. Cost and Schedule Control Management: What the Department of Defense Major Acquisition System Program Manager Needs to Know

    DTIC Science & Technology

    1992-03-01

    public release; distribution is unlimited. 2b. DECLASSIFICATION/DOWNGRADING SCHEDULE 4. PERFORMING ORGANIZATION REPORT NUMBER( S ) S . MONITORING...ORGANIZATION REPORT NUMBER( S ) Sa. NAME OF PERFORMING ORGANIZATION 6b. OFFICE SYMBOL 7a. NAME OF MONITORING ORGANIZATION Naval Postgraduate School (If appikable...PERSONAL AUTHOR( S ) Coutteau, Charles G. 13a. TYPE OF REPORT 1 3b. TIME COVE RED 14. DATE OF REPORT (year, month, day) 1S. PAGE COUNT Master’s TheisI From

  3. A Discussion of Issues in Integrity Constraint Monitoring

    NASA Technical Reports Server (NTRS)

    Fernandez, Francisco G.; Gates, Ann Q.; Cooke, Daniel E.

    1998-01-01

    In the development of large-scale software systems, analysts, designers, and programmers identify properties of data objects in the system. The ability to check those assertions during runtime is desirable as a means of verifying the integrity of the program. Typically, programmers ensure the satisfaction of such properties through the use of some form of manually embedded assertion check. The disadvantage to this approach is that these assertions become entangled within the program code. The goal of the research is to develop an integrity constraint monitoring mechanism whereby a repository of software system properties (called integrity constraints) are automatically inserted into the program by the mechanism to check for incorrect program behaviors. Such a mechanism would overcome many of the deficiencies of manually embedded assertion checks. This paper gives an overview of the preliminary work performed toward this goal. The manual instrumentation of constraint checking on a series of test programs is discussed, This review then is used as the basis for a discussion of issues to be considered in developing an automated integrity constraint monitor.

  4. U. S. Navy’s Superconductivity Programs; Scientific Curosity To Fleet Utility

    DTIC Science & Technology

    2010-10-01

    NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND...ADDRESS(ES) Naval Research Laboratory,Washington,DC,20375 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS...classes of materials studied for superconductivity were ternary alloys13, and organic materials14. The dilution refrigerator largely replaced

  5. Mobile Robot Enabled Detection of Explosives and Biological Agents

    DTIC Science & Technology

    2006-11-01

    Detection of Explosives and Biological Agents 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) 5d. PROJECT NUMBER 5e...TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) Wayne State University, SSIM Program, Detroit, Michigan 48202 8...PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME( S ) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM( S ) 11. SPONSOR

  6. Comparison of bioimpedance analysis scan, hemoglobin and urea reduction ratio in hemodialysis patients following and not following monitoring program for improving quality of life

    NASA Astrophysics Data System (ADS)

    Muzasti, R. A.; Lubis, H. R.

    2018-03-01

    Hemodialysis (HD) is the renal replacement therapy in end-stage renal disease (ESRD), at least 2-3 times a week, impacting substantial changes in daily life. Therefore a monitoring program is needed to improve the quality of life (QoL) of HD patients. Indicators in monitoring QoL include phase angle (PhA), muscle and fat mass, and body fluid composition through Bio Scan impedance analysis (BIA) Scan, hemoglobin level, and urea reduction ratio (URR). An analytic study with the cross-sectional design was performed in 168 patients at Klinik Spesialis Ginjal Hipertensi (KSGH) Rasyida, Medan to compare BIA Scan profiles, hemoglobin levels, and URR in HD patients who follow and do not follow the monitoring program for improving QoL {Program Pemantauan Peningkatan Kualitas Hidup (P3KH)}. Each variable was analyzed by independent T-test, it is significant if p <0.05. This study showed that there were differences in BMI (p = 0.006), fat mass (p = 0.010), extracellular water / intracellular water (ECW / ICW) (p = 0.046), and haemoglobin p = 0.001). Although it was better in the program group, statistically there was no difference of PhA (p = 0.136), muscle mass (p = 0.842), and URR (p = 0.232).

  7. Waste Isolation Pilot Plant site environmental report, for calendar year 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The U.S. Department of Energy (DOE) Order 5400.1 General Environmental Protection Program, requires DOE facilities, that conduct environmental protection programs, to annually prepare a Site Environmental Report (SER). The purpose of the SER is to provide an abstract of environmental assessments conducted in order to characterize site environmental management performance, to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit. The content of this SER is not restricted to a synopsis of the required data, in addition, information pertaining to new and continued monitoring and compliance activities during the 1995 calendar yearmore » are also included. Data contained in this report are derived from those monitoring programs directed by the Waste Isolation Pilot Plant (WIPP) Environmental Monitoring Plan (EMP). The EMP provides inclusive guidelines implemented to detect potential impacts to the environment and to establish baseline measurements for future environmental evaluations. Surface water, groundwater. air, soil, and biotic matrices are monitored for an array of radiological and nonradiological factors. The baseline radiological surveillance program encompasses a broader geographic area that includes nearby ranches, villages, and cities. Most elements of nonradiological assessments are conducted within the geographic vicinity of the WIPP site.« less

  8. Groundwater Protection Program Calendar Year 1998 Groundwater Monitoring Report, U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1999-03-01

    This annual monitoring report contains groundwater and surface water monitoring data obtained during calendar year (CY) 1998 by the Lockheed Martin Energy Systems, Inc. Y-12 Plant Groundwater Protection Program (GWPP) at the U.S. Department of Energy (DOE) Oak Ridge Y-12 Plant, Groundwater and surface water monitoring during CY 1998 was performed in three hydrogeologic regimes at the Y-12 Plant: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime), and the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valleymore » (BCV), and the Chestnut Ridge Regime which is located south of the Y-12 Plant.« less

  9. Display/control requirements for automated VTOL aircraft

    NASA Technical Reports Server (NTRS)

    Hoffman, W. C.; Kleinman, D. L.; Young, L. R.

    1976-01-01

    A systematic design methodology for pilot displays in advanced commercial VTOL aircraft was developed and refined. The analyst is provided with a step-by-step procedure for conducting conceptual display/control configurations evaluations for simultaneous monitoring and control pilot tasks. The approach consists of three phases: formulation of information requirements, configuration evaluation, and system selection. Both the monitoring and control performance models are based upon the optimal control model of the human operator. Extensions to the conventional optimal control model required in the display design methodology include explicit optimization of control/monitoring attention; simultaneous monitoring and control performance predictions; and indifference threshold effects. The methodology was applied to NASA's experimental CH-47 helicopter in support of the VALT program. The CH-47 application examined the system performance of six flight conditions. Four candidate configurations are suggested for evaluation in pilot-in-the-loop simulations and eventual flight tests.

  10. 40 CFR 60.1820 - How do I monitor the injection rate of activated carbon?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false How do I monitor the injection rate of activated carbon? 60.1820 Section 60.1820 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Small Municipal...

  11. 40 CFR 60.1820 - How do I monitor the injection rate of activated carbon?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false How do I monitor the injection rate of activated carbon? 60.1820 Section 60.1820 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Small Municipal...

  12. 40 CFR 60.1820 - How do I monitor the injection rate of activated carbon?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false How do I monitor the injection rate of activated carbon? 60.1820 Section 60.1820 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Small Municipal...

  13. 40 CFR 60.1820 - How do I monitor the injection rate of activated carbon?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false How do I monitor the injection rate of activated carbon? 60.1820 Section 60.1820 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Small Municipal...

  14. 40 CFR 60.2865 - How must I monitor opacity for air curtain incinerators?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false How must I monitor opacity for air curtain incinerators? 60.2865 Section 60.2865 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emissions Guidelines and Compliance Times for Commercial and...

  15. 40 CFR 60.2865 - How must I monitor opacity for air curtain incinerators?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false How must I monitor opacity for air curtain incinerators? 60.2865 Section 60.2865 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emissions Guidelines and Compliance Times for Commercial and...

  16. Usefulness of a Perceived Exertion Scale for Monitoring Exercise Intensity in Adults with Intellectual Disabilities

    ERIC Educational Resources Information Center

    Stanish, Heidi I.; Aucoin, Michael

    2007-01-01

    In order to gain physical fitness and health, exercise must be performed at a sufficient level of intensity. Exercise intensity can be monitored with rated perceived exertion (RPE) scales to promote safe and effective programming. The usefulness of the Children's OMNI Scale as a subjective measure of intensity for adults with intellectual…

  17. 77 FR 9956 - Announcement of Funding Awards for the Sustainable Communities Regional Planning Grant Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-21

    ... of regional significance, use data to set and monitor progress toward performance goals, and engage... Principles; d. Use geo-coded data sets and other metrics in developing, implementing, monitoring, and... (103 Stat. 1987, 42 U.S.C. 3545), the Department is publishing the names, addresses, and amounts of the...

  18. Y-12 Groundwater Protection Program Groundwater and Surface water Sampling and Analysis Plan for Calendar Year 2006

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    2006-01-01

    This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2006 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2006 will be in accordance with DOE Order 540.1 requirements and the following goals: {sm_bullet} to maintain surveillance of existing and potential groundwater contamination sources; {sm_bullet} to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminantsmore » are most likely to migrate beyond the Oak Ridge Reservation property line; {sm_bullet} to identify and characterize long-term trends in groundwater quality at Y-12; and ! to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2006 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation (Figure A.1). Modifications to the CY 2006 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2006 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3; sample collection methods and procedures are described in Section 4; and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. The monitoring frequency and selection criteria for each sampling location is in Appendix C. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix D. If issued, addenda to this plan will be inserted in Appendix E, and Groundwater Monitoring Schedules (when issued) will be inserted in Appendix F. Guidance for managing purged groundwater is provided in Appendix G.« less

  19. A practical tool for monitoring the performance of measuring systems in a laboratory network: report of an ACB Working Group.

    PubMed

    Ayling, Pete; Hill, Robert; Jassam, Nuthar; Kallner, Anders; Khatami, Zahra

    2017-11-01

    Background A logical consequence of the introduction of robotics and high-capacity analysers has seen a consolidation to larger units. This requires new structures and quality systems to ensure that laboratories deliver consistent and comparable results. Methods A spreadsheet program was designed to accommodate results from up to 12 different instruments/laboratories and present IQC data, i.e. Levey-Jennings and Youden plots and comprehensive numerical tables of the performance of each item. Input of data was made possible by a 'data loader' by which IQC data from the individual instruments could be transferred to the spreadsheet program on line. Results A set of real data from laboratories is used to populate the data loader and the networking software program. Examples are present from the analysis of variance components, the Levey-Jennings and Youden plots. Conclusions This report presents a software package that allows the simultaneous management and detailed monitoring of the performance of up to 12 different instruments/laboratories in a fully interactive mode. The system allows a quality manager of networked laboratories to have a continuous updated overview of the performance. This software package has been made available at the ACB website.

  20. A Dynamic Programming Model for Optimizing Frequency of Time-Lapse Seismic Monitoring in Geological CO2 Storage

    NASA Astrophysics Data System (ADS)

    Bhattacharjya, D.; Mukerji, T.; Mascarenhas, O.; Weyant, J.

    2005-12-01

    Designing a cost-effective and reliable monitoring program is crucial to the success of any geological CO2 storage project. Effective design entails determining both, the optimal measurement modality, as well as the frequency of monitoring the site. Time-lapse seismic provides the best spatial coverage and resolution for reservoir monitoring. Initial results from Sleipner (Norway) have demonstrated effective monitoring of CO2 plume movement. However, time-lapse seismic is an expensive monitoring technique especially over the long term life of a storage project and should be used judiciously. We present a mathematical model based on dynamic programming that can be used to estimate site-specific optimal frequency of time-lapse surveys. The dynamics of the CO2 sequestration process are simplified and modeled as a four state Markov process with transition probabilities. The states are M: injected CO2 safely migrating within the target zone; L: leakage from the target zone to the adjacent geosphere; R: safe migration after recovery from leakage state; and S: seepage from geosphere to the biosphere. The states are observed only when a monitoring survey is performed. We assume that the system may go to state S only from state L. We also assume that once observed to be in state L, remedial measures are always taken to bring it back to state R. Remediation benefits are captured by calculating the expected penalty if CO2 seeped into the biosphere. There is a trade-off between the conflicting objectives of minimum discounted costs of performing the next time-lapse survey and minimum risk of seepage and its associated costly consequences. A survey performed earlier would spot the leakage earlier. Remediation methods would have been utilized earlier, resulting in savings in costs attributed to excessive seepage. On the other hand, there are also costs for the survey and remedial measures. The problem is solved numerically using Bellman's optimality principal of dynamic programming to optimize over the entire finite time horizon. We use a Monte Carlo approach to explore trade-offs between survey costs, remediation costs, and survey frequency and to analyze the sensitivity to leakage probabilities, and carbon tax. The model can be useful in determining a monitoring regime appropriate to a specific site's risk and set of remediation options, rather than a generic one based on a maximum downside risk threshold for CO2 storage as a whole. This may have implications on the overall costs associated with deploying Carbon capture and storage on a large scale.

  1. Community radiation monitoring program. Annual report, October 1, 1992--September 30, 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cooper, E.N.

    1994-08-01

    The Community Radiation Monitoring Program (CRMP) is a cooperative effort between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), the Desert Research Institute (DRI), a division of the University and Community College System of Nevada, and the Nuclear Engineering Laboratory of the University of Utah (UUNEL). The thirteenth year of this program began in the fall of 1992, and the work continues as an integral part of the DOE--sponsored long-term offsite radiological monitoring effort that has been conducted by EPA and its predecessors since the inception of nuclear testing at the Nevada Test Site (NTS). Themore » CRMP began by enhancing and centralizing environmental monitoring and sampling equipment at 15 communities in the then-existing EPA monitoring network around the NTS, and has since expanded to 19 locations in Nevada, Utah, and California. The primary objectives of this program are still to increase the understanding by the people who live in the area surrounding the NTS of the activities for which DOE is responsible, to enhance the performance of radiological sampling and monitoring, and to inform all concerned of the results of these efforts. One of the primary methods used to improve the communication link with the people in the potentially impacted area has been the hiring and training of local citizens as Station Managers and program representatives in those selected communities in the offsite area. These mangers, active science teachers wherever possible, have succeeded through their training, experience, community standing, and effort in becoming a very visible, able, and valuable asset in this link.« less

  2. 40 CFR 60.1270 - What is required for my continuous opacity monitoring system and how are the data used?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance for Small Municipal Waste Combustion Units for Which Construction is... Performance Specification 1 in appendix B of this part. Complete the evaluation within 60 days after your...

  3. 40 CFR 63.9642 - What records must I keep?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Records of performance tests and performance evaluations as required in § 63.10(b)(2)(viii). (b) For each... described in § 63.10(b)(2)(vi) through (xi). (2) Monitoring data for COMS during a performance evaluation as... Section 63.9642 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS...

  4. 38 CFR 49.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... readily quantified, such quantitative data should be related to cost data for computation of unit costs... including, when appropriate, analysis and explanation of cost overruns or high unit costs. (e) Recipients... performance data from recipients. (Authority: Pub. L. 104-156; 110 Stat. 1396) ...

  5. 10 CFR 63.132 - Confirmation of geotechnical and design parameters.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Commission. (e) In situ monitoring of the thermomechanical response of the underground facility must be... IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Performance Confirmation Program § 63.132... engineered systems and components, must be identified in the performance confirmation plan. (d) These...

  6. 10 CFR 63.132 - Confirmation of geotechnical and design parameters.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Commission. (e) In situ monitoring of the thermomechanical response of the underground facility must be... IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Performance Confirmation Program § 63.132... engineered systems and components, must be identified in the performance confirmation plan. (d) These...

  7. 10 CFR 63.132 - Confirmation of geotechnical and design parameters.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Commission. (e) In situ monitoring of the thermomechanical response of the underground facility must be... IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Performance Confirmation Program § 63.132... engineered systems and components, must be identified in the performance confirmation plan. (d) These...

  8. 10 CFR 63.132 - Confirmation of geotechnical and design parameters.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Commission. (e) In situ monitoring of the thermomechanical response of the underground facility must be... IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Performance Confirmation Program § 63.132... engineered systems and components, must be identified in the performance confirmation plan. (d) These...

  9. 10 CFR 63.132 - Confirmation of geotechnical and design parameters.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Commission. (e) In situ monitoring of the thermomechanical response of the underground facility must be... IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Performance Confirmation Program § 63.132... engineered systems and components, must be identified in the performance confirmation plan. (d) These...

  10. Army requirements for micro and nanotechnology-based sensors in weapons health and battlefield environmental monitoring applications

    NASA Astrophysics Data System (ADS)

    Ruffin, Paul; Brantley, Christina; Edwards, Eugene; Hutcheson, Guilford

    2006-03-01

    The Army Aviation and Missile Research, Development, and Engineering Center (AMRDEC) and the Army Research Laboratory (ARL) have initiated a joint advanced technology demonstration program entitled "Prognostics/Diagnostics for the Future Force (PDFF)" with a key objective of developing low or no power embedded sensor suites for harsh environmental monitoring. The most critical challenge of the program is to specify requirements for the embedded sensor suites which will perform on-board diagnostics, maintain a history of sensor data, and forecast weapon health. The authors are currently collaborating with the PDFF program managers and potential customers to quantify the requirements for remotely operated, micro/nano-technology-based sensors for a host of candidate weapon systems. After requirements are finalized, current micro/nanotechnology-based temperature, humidity, g-shock, vibration and chemical sensors for monitoring the out-gassing of weapons propellant, as well as hazardous gaseous species on the battlefield and in urban environments will be improved to meet the full requirements of the PDFF program. In this paper, performance requirements such as power consumption, reliability, maintainability, survivability, size, and cost, along with the associated technical challenges for micro/nanotechnology-based sensor systems operating in military environments, are discussed. In addition, laboratory results from the design and testing of a wireless sensor array, which was developed using a thin film of functionalized carbon nanotube materials, are presented. Conclusions from the research indicate that the detection of bio-hazardous materials is possible using passive and active wireless sensors based on monitoring the reflected phase from the sensor.

  11. Challenges and strategies in applying performance measurement to federal public health programs.

    PubMed

    DeGroff, Amy; Schooley, Michael; Chapel, Thomas; Poister, Theodore H

    2010-11-01

    Performance measurement is widely accepted in public health as an important management tool supporting program improvement and accountability. However, several challenges impede developing and implementing performance measurement systems at the federal level, including the complexity of public health problems that reflect multiple determinants and involve outcomes that may take years to achieve, the decentralized and networked nature of public health program implementation, and the lack of reliable and consistent data sources and other issues related to measurement. All three of these challenges hinder the ability to attribute program results to specific public health program efforts. The purpose of this paper is to explore these issues in detail and offer potential solutions that support the development of robust and practical performance measures to meet the needs for program improvement and accountability. Adapting performance measurement to public health programs is both an evolving science and art. Through the strategies presented here, appropriate systems can be developed and monitored to support the production of meaningful data that will inform effective decision making at multiple levels. Published by Elsevier Ltd.

  12. Long-term continuous monitor demonstration program: Columbus and Southern Ohio Electric Company, Conesville Unit 6. Final report Dec 79-Mar 83

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peduto, E.F. Jr.; Porter, T.J.; Midgley, D.P.

    1984-03-01

    The report gives results of a continuous monitoring demonstration at the Columbus and Southern Ohio Electric Company's Conesville Generating Station. The purpose of the demonstration was to determine the feasibility of the requirements for monitoring and control of SO2 emissions as specified in 40 CFR, Part 60, Subpart Da, which promulgates new source performance standards (NSPS) for new utility steam generators. A secondary objective was to adhere to the draft quality assurance requirements scheduled for promulgation as Appendix F. The report describes program activities and results of the field portion, during which data were collected for about 12 months ofmore » a 16-month period.« less

  13. Designing monitoring programs for chemicals of emerging concern in potable reuse--what to include and what not to include?

    PubMed

    Drewes, J E; Anderson, P; Denslow, N; Olivieri, A; Schlenk, D; Snyder, S A; Maruya, K A

    2013-01-01

    This study discussed a proposed process to prioritize chemicals for reclaimed water monitoring programs, selection of analytical methods required for their quantification, toxicological relevance of chemicals of emerging concern regarding human health, and related issues. Given that thousands of chemicals are potentially present in reclaimed water and that information about those chemicals is rapidly evolving, a transparent, science-based framework was developed to guide prioritization of which compounds of emerging concern (CECs) should be included in reclaimed water monitoring programs. The recommended framework includes four steps: (1) compile environmental concentrations (e.g., measured environmental concentration or MEC) of CECs in the source water for reuse projects; (2) develop a monitoring trigger level (MTL) for each of these compounds (or groups thereof) based on toxicological relevance; (3) compare the environmental concentration (e.g., MEC) to the MTL; CECs with a MEC/MTL ratio greater than 1 should be prioritized for monitoring, compounds with a ratio less than '1' should only be considered if they represent viable treatment process performance indicators; and (4) screen the priority list to ensure that a commercially available robust analytical method is available for that compound.

  14. Sustainable urban stormwater management in the tropics: An evaluation of Singapore's ABC Waters Program

    NASA Astrophysics Data System (ADS)

    Lim, H. S.; Lu, X. X.

    2016-07-01

    The Active Beautiful Clean (ABC) Waters Program was implemented in 2006 as part of Singapore's stormwater management strategy and reflects the country's move towards Water Sensitive Urbanism through the adoption of Low-Impact Development (LID) ideology and practices. It is the first holistic and comprehensive LID program in the tropics and holds promise for extension to other tropical cities. This paper presents a comprehensive summary of the goals, LID practices (ABC design features) and design considerations as well as results of several monitored sites, including a constructed wetland, two rain gardens, green roofs and three canal restoration projects. We evaluate the ABC Waters Program based on these initial results and consider the challenges, issues and the research needs for it to meet its hydrological and water quality remediation goals. So far, the ABC design features evaluated perform well in removing particulates. Performance in nutrient removal is poor. With over 60 projects completed within 10 years, post-project monitoring and evaluation is necessary and complements on-going laboratory and modelling research projects conducted by local academic institutions.

  15. LASL benchmark performance 1978. [CDC STAR-100, 6600, 7600, Cyber 73, and CRAY-1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McKnight, A.L.

    1979-08-01

    This report presents the results of running several benchmark programs on a CDC STAR-100, a Cray Research CRAY-1, a CDC 6600, a CDC 7600, and a CDC Cyber 73. The benchmark effort included CRAY-1's at several installations running different operating systems and compilers. This benchmark is part of an ongoing program at Los Alamos Scientific Laboratory to collect performance data and monitor the development trend of supercomputers. 3 tables.

  16. Environmental Assessment for the Construction of Eielson AFB Youth Center Eielson Air Force Base, Alaska

    DTIC Science & Technology

    2010-09-01

    5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S...AND ADDRESS(ES) Bestech,1040 Lorne Street unit 3,Sudbury, Ontario P3C 4R9, 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING...athletic activities, including soccer, baseball, softball , t-ball, football, cheerleading, junior wrestling, and basketball. Instructional programs

  17. Assessment of the Federal Voting Assistance Program Office Implementation of the Military and Overseas Voter Empowerment Act

    DTIC Science & Technology

    2012-08-31

    7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Department of Defense Inspector General,4800 Mark Center Drive,Alexandria,VA,22350-1500 8... PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) 11. SPONSOR/MONITOR’S...Empowerment (MOVE) Act What We Did To determine if voting assistance programs carried out under the Uniformed and Overseas Absentee Voting Act

  18. Participation Rates, Process Monitoring, and Quality Improvement Among Cardiac Rehabilitation Programs in the United States: A NATIONAL SURVEY.

    PubMed

    Pack, Quinn R; Squires, Ray W; Lopez-Jimenez, Francisco; Lichtman, Steven W; Rodriguez-Escudero, Juan P; Lindenauer, Peter K; Thomas, Randal J

    2015-01-01

    Although strategies exist for improving cardiac rehabilitation (CR) participation rates, it is unclear how frequently these strategies are used and what efforts are being made by CR programs to improve participation rates. We surveyed all CR program directors in the American Association of Cardiovascular and Pulmonary Rehabilitation's database. Data collection included program characteristics, the use of specific referral and recruitment strategies, and self-reported program participation rates. Between 2007 and 2012, 49% of programs measured referral of inpatients from the hospital, 21% measured outpatient referral from office/clinic, 71% measured program enrollment, and 74% measured program completion rates. Program-reported participation rates (interquartile range) were 68% (32-90) for hospital referral, 35% (15-60) for office/clinic referral, 70% (46-80) for enrollment, and 75% (62-82) for program completion. The majority of programs utilized a hospital-based systematic referral, liaison-facilitated referral, or inpatient CR program referral (64%, 68%, and 60% of the time, respectively). Early appointments (<2 weeks) were utilized by 35%, and consistent phone call appointment reminders were utilized by 50% of programs. Quality improvement (QI) projects were performed by about half of CR programs. Measurement of participation rates was highly correlated with performing QI projects (P < .0001.) : Although programs are aware of participation rate gaps, the monitoring of participation rates is suboptimal, QI initiatives are infrequent, and proven strategies for increasing patient participation are inconsistently utilized. These issues likely contribute to the national CR participation gap and may prove to be useful targets for national QI initiatives.

  19. Y-12 Groundwater Protection Program Groundwater And Surface Water Sampling And Analysis Plan For Calendar Year 2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elvado Environmental LLC

    2009-09-01

    This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2010 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2010 will be in accordance with requirements of DOE Order 540.1A and the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contaminationmore » and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2010 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation. Modifications to the CY 2010 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2010 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2010) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F.« less

  20. 15 CFR 14.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... readily quantified, such quantitative data should be related to cost data for computation of unit costs... including, when appropriate, analysis and explanation of cost overruns or high unit costs. (e) Recipients... comply with clearance requirements of 5 CFR part 1320 when requesting performance data from recipients. ...

  1. 7 CFR 4284.960 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... advantages or disadvantages of supply chain arrangements or equitable distribution of rewards and responsibilities for mid-tier value chain projects; and (v) Recommendations from Beginning Farmers or Socially...

  2. 7 CFR 4284.960 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... advantages or disadvantages of supply chain arrangements or equitable distribution of rewards and responsibilities for mid-tier value chain projects; and (v) Recommendations from Beginning Farmers or Socially...

  3. 7 CFR 4284.960 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... advantages or disadvantages of supply chain arrangements or equitable distribution of rewards and responsibilities for mid-tier value chain projects; and (v) Recommendations from Beginning Farmers or Socially...

  4. 76 FR 64079 - Notice of Submission for OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ... agency performance on other evaluative measures used in monitoring of Vocational Rehabilitation grantees and for other program and research purposes. Copies of the information collection submission for OMB...

  5. System for corrosion monitoring in pipeline applying fuzzy logic mathematics

    NASA Astrophysics Data System (ADS)

    Kuzyakov, O. N.; Kolosova, A. L.; Andreeva, M. A.

    2018-05-01

    A list of factors influencing corrosion rate on the external side of underground pipeline is determined. Principles of constructing a corrosion monitoring system are described; the system performance algorithm and program are elaborated. A comparative analysis of methods for calculating corrosion rate is undertaken. Fuzzy logic mathematics is applied to reduce calculations while considering a wider range of corrosion factors.

  6. Validation environment for AIPS/ALS: Implementation and results

    NASA Technical Reports Server (NTRS)

    Segall, Zary; Siewiorek, Daniel; Caplan, Eddie; Chung, Alan; Czeck, Edward; Vrsalovic, Dalibor

    1990-01-01

    The work is presented which was performed in porting the Fault Injection-based Automated Testing (FIAT) and Programming and Instrumentation Environments (PIE) validation tools, to the Advanced Information Processing System (AIPS) in the context of the Ada Language System (ALS) application, as well as an initial fault free validation of the available AIPS system. The PIE components implemented on AIPS provide the monitoring mechanisms required for validation. These mechanisms represent a substantial portion of the FIAT system. Moreover, these are required for the implementation of the FIAT environment on AIPS. Using these components, an initial fault free validation of the AIPS system was performed. The implementation is described of the FIAT/PIE system, configured for fault free validation of the AIPS fault tolerant computer system. The PIE components were modified to support the Ada language. A special purpose AIPS/Ada runtime monitoring and data collection was implemented. A number of initial Ada programs running on the PIE/AIPS system were implemented. The instrumentation of the Ada programs was accomplished automatically inside the PIE programming environment. PIE's on-line graphical views show vividly and accurately the performance characteristics of Ada programs, AIPS kernel and the application's interaction with the AIPS kernel. The data collection mechanisms were written in a high level language, Ada, and provide a high degree of flexibility for implementation under various system conditions.

  7. 75 FR 33391 - Amendments to the Protocol Gas Verification Program and Minimum Competency Requirements for Air...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-11

    ...Recent EPA gas audit results indicate that some gas cylinders used to calibrate continuous emission monitoring systems on stationary sources do not meet EPA's performance specification. Reviews of stack test reports in recent years indicate that some stack testers do not properly follow EPA test methods or do not correctly calculate test method results. Therefore, EPA is proposing to amend its Protocol Gas Verification Program (PGVP) and the minimum competency requirements for air emission testing (formerly air emission testing body requirements) to improve the accuracy of emissions data. EPA is also proposing to amend other sections of the Acid Rain Program continuous emission monitoring system regulations by adding and clarifying certain recordkeeping and reporting requirements, removing the provisions pertaining to mercury monitoring and reporting, removing certain requirements associated with a class-approved alternative monitoring system, disallowing the use of a particular quality assurance option in EPA Reference Method 7E, adding an incorporation by reference that was inadvertently left out of the January 24, 2008 final rule, and clarifying the language and applicability of certain provisions.

  8. ADAMS executive and operating system

    NASA Technical Reports Server (NTRS)

    Pittman, W. D.

    1981-01-01

    The ADAMS Executive and Operating System, a multitasking environment under which a variety of data reduction, display and utility programs are executed, a system which provides a high level of isolation between programs allowing them to be developed and modified independently, is described. The Airborne Data Analysis/Monitor System (ADAMS) was developed to provide a real time data monitoring and analysis capability onboard Boeing commercial airplanes during flight testing. It inputs sensor data from an airplane performance data by applying transforms to the collected sensor data, and presents this data to test personnel via various display media. Current utilization and future development are addressed.

  9. Resource Isolation Method for Program’S Performance on CMP

    NASA Astrophysics Data System (ADS)

    Guan, Ti; Liu, Chunxiu; Xu, Zheng; Li, Huicong; Ma, Qiang

    2017-10-01

    Data center and cloud computing are more popular, which make more benefits for customers and the providers. However, in data center or clusters, commonly there is more than one program running on one server, but programs may interference with each other. The interference may take a little effect, however, the interference may cause serious drop down of performance. In order to avoid the performance interference problem, the mechanism of isolate resource for different programs is a better choice. In this paper we propose a light cost resource isolation method to improve program’s performance. This method uses Cgroups to set the dedicated CPU and memory resource for a program, aiming at to guarantee the program’s performance. There are three engines to realize this method: Program Monitor Engine top program’s resource usage of CPU and memory and transfer the information to Resource Assignment Engine; Resource Assignment Engine calculates the size of CPU and memory resource should be applied for the program; Cgroups Control Engine divide resource by Linux tool Cgroups, and drag program in control group for execution. The experiment result show that making use of the resource isolation method proposed by our paper, program’s performance can be improved.

  10. Microwave and millimeter wave monolithic integrated circuits (MIMIC) program. MIMIC briefs: Summaries of phase 3 technology support programs

    NASA Astrophysics Data System (ADS)

    Kramer, Warner

    1993-01-01

    This publication contains technical and contractual summaries of the MIMIC program's Phase 3 technology support programs. Each project description includes a discussion of the objectives of the effort, the approach pursued, and recent progress. Also identified are the performing organization(s), principal investigator and/or other key personnel, contract number, program funding and duration, and program monitor/COTR. Concluding the document is a directory of the personnel associated with these projects, from whom more information may be requested.

  11. Cycle 24 HST+COS Target Acquisition Monitor Summary

    NASA Astrophysics Data System (ADS)

    Penton, Steven V.; White, James

    2018-06-01

    HST/COS calibration program 14847 (P14857) was designed to verify that all three COS Target Acquisition (TA) modes were performing nominally during Cycle 24. The program was designed not only to determine if any of the COS TA flight software (FSW) patchable constants need updating but also to determine the values of any required parameter updates. All TA modes were determined to be performing nominally during the Cycle 24 calendar period of October 1, 2016 - October 1, 2017. No COS SIAF, TA subarray, or FSW parameter updates were required as a result of this program.

  12. Quality assurance for respiratory care services: a computer-assisted program.

    PubMed

    Elliott, C G

    1993-01-01

    At present, the principal advantage of computer-assisted quality assurance is the acquisition of quality assurance date without resource-consuming chart reviews. A surveillance program like the medical director's alert may reduce morbidity and mortality. Previous research suggests that inadequate oxygen therapy or failures in airway management are important causes of preventable deaths in hospitals. Furthermore, preventable deaths tend to occur among patients who have lower severity-of-illness scores and who are not in ICUs. Thus, surveillance of the entire hospital, as performed by the HIS medical director's alert, may significantly impact hospital mortality related to respiratory care. Future research should critically examine the potential of such computerized systems to favorably change the morbidity and mortality of hospitalized patients. The departments of respiratory care and medical informatics at LDS Hospital have developed a computer-assisted approach to quality assurance monitoring of respiratory care services. This system provides frequent and consistent samples of a variety of respiratory care data. The immediate needs of patients are addressed through a daily surveillance system (medical director's alert). The departmental quality assurance program utilizes a separate program that monitors clinical indicators of staff performance in terms of stated departmental policies and procedures (rate-based clinical indicators). The availability of an integrated patient database allows these functions to be performed without labor-intensive chart audits.

  13. Longview Public Library Final Performance Report for Library Services and Construction Act (LCSA) Title VI Library Literacy Program.

    ERIC Educational Resources Information Center

    Longview Public Library, WA.

    Project Read at the Longview (Washington) Public Library conducted a program to maintain and expand the Family Literacy Center to provide a monitored tutoring site and family outreach program for a minimum of 75 adult learners and 40 tutors. Two projects were involved: (1) Project READ focused on adult learners with a one-on-one tutoring approach;…

  14. 40 CFR Appendix B to Part 60 - Performance Specifications

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 6216-98 is the reference for design specifications, manufacturer's performance specifications, and test... representative of a group of monitors produced during a specified period or lot, for conformance with the design... technique and a single analytical program are used. One Run may include results for more than one test...

  15. 29 CFR 95.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... quantitative data should be related to cost data for computation of unit costs. (2) Reasons why established..., analysis and explanation of cost overruns or high unit costs. (e) Recipients shall not be required to... performance data from recipients. (Approved by the Office of Management and Budget, Approval Number 1225-0017) ...

  16. 45 CFR 74.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... quantitative data should be related to cost data for computation of unit costs. (2) Reasons why established..., analysis and explanation of cost overruns or high unit costs. (e) Recipients shall submit the original and..., “Controlling Paperwork Burdens on the Public,” when requesting performance data from recipients. ...

  17. 2 CFR 215.51 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., such quantitative data should be related to cost data for computation of unit costs. (2) Reasons why..., analysis and explanation of cost overruns or high unit costs. (e) Recipients shall not be required to... clearance requirements of 5 CFR part 1320 when requesting performance data from recipients. ...

  18. High Performance Concrete in Washington State SR 18/SR 516 Overcrossing: Interim Report on Girder Monitoring

    DOT National Transportation Integrated Search

    2000-04-01

    In the mid 1990s the Federal Highway Administration (FHWA) established a High Performance Concrete (HPC) program aimed at demonstrating the positive effects of utilizing HPC in bridges. Research on the benefits of using HPC for bridges has shown a nu...

  19. Applying Sigma Metrics to Reduce Outliers.

    PubMed

    Litten, Joseph

    2017-03-01

    Sigma metrics can be used to predict assay quality, allowing easy comparison of instrument quality and predicting which tests will require minimal quality control (QC) rules to monitor the performance of the method. A Six Sigma QC program can result in fewer controls and fewer QC failures for methods with a sigma metric of 5 or better. The higher the number of methods with a sigma metric of 5 or better, the lower the costs for reagents, supplies, and control material required to monitor the performance of the methods. Copyright © 2016 Elsevier Inc. All rights reserved.

  20. Assessing exposures to household air pollution in public health research and program evaluation.

    PubMed

    Northcross, Amanda L; Hwang, Nina; Balakrishnan, Kalpana; Mehta, Sumi

    2015-03-01

    Exposure to smoke from the use of solid fuels and inefficient stoves for cooking and heating is responsible for approximately 4 million premature deaths yearly. As increasing investments are made to tackle this important public health issue, there is a need for identifying and providing guidance on best practices for exposure and stove performance monitoring, particularly for public health research and evaluation studies. This paper, which builds upon the discussion at an expert consultation on exposure assessment convened by the Global Alliance for Clean Cookstoves, the Centers for Disease Control and Prevention, and PATH in late 2012, aims to provide general guidance on what to monitor, who and where to monitor, and how to monitor household air pollution exposures. In addition, we summarize information about commercially available monitoring equipment and the technical properties of these monitors most important for household air pollution exposure assessment. The target audience includes epidemiologists conducting health studies and program evaluators aiming to quantify changes in exposures to estimate the potential health benefits of cookstoves intervention projects.

  1. Methods for accurate cold-chain temperature monitoring using digital data-logger thermometers

    NASA Astrophysics Data System (ADS)

    Chojnacky, M. J.; Miller, W. M.; Strouse, G. F.

    2013-09-01

    Complete and accurate records of vaccine temperature history are vital to preserving drug potency and patient safety. However, previously published vaccine storage and handling guidelines have failed to indicate a need for continuous temperature monitoring in vaccine storage refrigerators. We evaluated the performance of seven digital data logger models as candidates for continuous temperature monitoring of refrigerated vaccines, based on the following criteria: out-of-box performance and compliance with manufacturer accuracy specifications over the range of use; measurement stability over extended, continuous use; proper setup in a vaccine storage refrigerator so that measurements reflect liquid vaccine temperatures; and practical methods for end-user validation and establishing metrological traceability. Data loggers were tested using ice melting point checks and by comparison to calibrated thermocouples to characterize performance over 0 °C to 10 °C. We also monitored logger performance in a study designed to replicate the range of vaccine storage and environmental conditions encountered at provider offices. Based on the results of this study, the Centers for Disease Control released new guidelines on proper methods for storage, handling, and temperature monitoring of vaccines for participants in its federally-funded Vaccines for Children Program. Improved temperature monitoring practices will ultimately decrease waste from damaged vaccines, improve consumer confidence, and increase effective inoculation rates.

  2. Assessing the performance of mental health service facilities for meeting patient priorities and health service responsiveness.

    PubMed

    Bramesfeld, A; Stegbauer, C

    2016-10-01

    The World Health Organisation has defined health service responsiveness as one of the key-objectives of health systems. Health service responsiveness relates to the ability to respond to service users' legitimate expectations on non-medical issues when coming into contact with the services of a healthcare system. It is defined by the areas showing respect for persons and patient orientation. Health service responsiveness is particularly relevant to mental health services, due to the specific vulnerability of mental health patients but also because it matches what mental health patients consider as good quality of care as well as their priorities when seeking healthcare. As (mental) health service responsiveness applies equally to all concerned services it would be suitable as a universal indicator for the quality of services' performance. However, performance monitoring programs in mental healthcare rarely assess health service performance with respect to meeting patient priorities. This is in part due of patient priorities as an outcome being underrepresented in studies that evaluate service provision. The lack of studies using patient priorities as outcomes transmits into evidence based guidelines and subsequently, into underrepresentation of patient priorities in performance monitoring. Possible ways out of this situation include more intervention studies using patient priorities as outcome, considering evidence from qualitative studies in guideline development and developing performance monitoring programs along the patient pathway and on key-points of relevance for service quality from a patient perspective.

  3. NUCLA Circulating Atmospheric Fluidized Bed Demonstration Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keith, Raymond E.; Heller, Thomas J.; Bush, Stuart A.

    1991-01-01

    This Annual Report on Colorado-Ute Electric Association's NUCLA Circulating Fluidized Bed (CFB) Demonstration Program covers the period from February 1987 through December 1988. The outline for presentation in this report includes a summary of unit operations along with individual sections covering progress in study plan areas that commenced during this reporting period. These include cold-mode shakedown and calibration, plant commercial performance statistics, unit start-up (cold), coal and limestone preparation and handling, ash handling system performance and operating experience, tubular air heater, baghouse operation and performance, materials monitoring, and reliability monitoring. During this reporting period, the coal-mode shakedown and calibration planmore » was completed. (VC)« less

  4. U.S. Policy Approaches for Maintaining Stability in the Asia-Pacific Region: History, Economics, and Soft Power

    DTIC Science & Technology

    2014-05-01

    5c. PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) CDR Scott N. Richardson United States Navy 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK...UNIT NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) U.S. Army Command and General Staff College ATTN: ATZL-SWD-GD Fort Leavenworth, KS...66027-2301 8. PERFORMING ORG REPORT NUMBER 9. SPONSORING / MONITORING AGENCY NAME( S ) AND ADDRESS(ES) Advanced Strategic Leadership Studies Program

  5. Development of Medical Technology for Contingency Response to Marrow Toxic Agents

    DTIC Science & Technology

    2013-10-30

    NUMBER N/A 5b. GRANT NUMBER N00014-12-1-0142 5c. PROGRAM ELEMENT NUMBER N/A 6. AUTHOR( S ) Spellman, Stephen 5d. PROJECT NUMBER N/A 5e. TASK...NUMBER Project 1, 2, 3, 4 5f. WORK UNIT NUMBER N/A 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) National Marrow Donor Program 3001 Broadway...St., N.E., Ste. 500 Minneapolis, MN 55413 8. PERFORMING ORGANIZATION REPORT NUMBER N/A 9. SPONSORING/MONITORING AGENCY NAME( S ) AND ADDRESS(ES

  6. Highway concrete pavement technology development and testing : volume IV, field evaluation of Strategic Highway Research Program (SHRP) C-206 test sites (early opening of full-depth pavement repairs).

    DOT National Transportation Integrated Search

    2006-08-01

    The objective of this study was to monitor and evaluate the performance of experimental full-depth repairs made with high-early-strength (HES) materials placed under Strategic Highway Research Program (SHRP) project C-206, Optimization of Highway Con...

  7. SRS environmental air surveillance program 1954-2015: General trends

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Abbott, K.; Jannik, T.

    The radiological monitoring program at SRS was established under the DuPont Company in June 1951 and was used as a measurement of the effectiveness of plant controls and as an authoritative record of environmental conditions surrounding the plant. It also served as a method of demonstrating compliance with applicable federal regulations and guidance. This document serves as a general summary of changes made specifically to the environmental air monitoring program since its inception, and a discussion of the general trends seen in the air monitoring program at SRS from 1954 to 2015. Initially, the environmental air surveillance program focused notmore » only on releases from SRS but also on fallout from various weapons testing performed through the end of 1978. Flypaper was used to measure the amount of fallout in the atmosphere during this period, and was present at each of the 10 monitoring stations. By 1959, all site stacks were included in the air monitoring program to determine their contribution to the airborne radioactivity onsite, and the number of air surveillance samplers rose to 18. This trend of an increased number of sampling locations continued to a peak of 35 sampling locations before shifting to a downward trend in the mid-1990s. In 1962, 4 outer-range samplers were placed in Savannah and Macon, GA, and in Greenville and Columbia, SC. Until 1976, air samplers were simply placed around the perimeter of the various operation locations (after 1959, this included stacks to determine their contribution to the airborne radioactivity), with the intent of creating as representative a distribution as possible of the air surrounding operations.« less

  8. OPTICAL FIBER SENSOR TECHNOLOGIES FOR EFFICIENT AND ECONOMICAL OIL RECOVERY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anbo Wang; Kristie L. Cooper; Gary R. Pickrell

    2003-06-01

    Efficient recovery of petroleum reserves from existing oil wells has been proven to be difficult due to the lack of robust instrumentation that can accurately and reliably monitor processes in the downhole environment. Commercially available sensors for measurement of pressure, temperature, and fluid flow exhibit shortened lifetimes in the harsh downhole conditions, which are characterized by high pressures (up to 20 kpsi), temperatures up to 250 C, and exposure to chemically reactive fluids. Development of robust sensors that deliver continuous, real-time data on reservoir performance and petroleum flow pathways will facilitate application of advanced recovery technologies, including horizontal and multilateralmore » wells. This is the final report for the four-year program ''Optical Fiber Sensor Technologies for Efficient and Economical Oil Recovery'', funded by the National Petroleum Technology Office of the U.S. Department of Energy, and performed by the Center for Photonics Technology of the Bradley Department of Electrical and Computer Engineering at Virginia Tech from October 1, 1999 to March 31, 2003. The main objective of this research program was to develop cost-effective, reliable optical fiber sensor instrumentation for real-time monitoring of various key parameters crucial to efficient and economical oil production. During the program, optical fiber sensors were demonstrated for the measurement of temperature, pressure, flow, and acoustic waves, including three successful field tests in the Chevron/Texaco oil fields in Coalinga, California, and at the world-class oil flow simulation facilities in Tulsa, Oklahoma. Research efforts included the design and fabrication of sensor probes, development of signal processing algorithms, construction of test systems, development and testing of strategies for the protection of optical fibers and sensors in the downhole environment, development of remote monitoring capabilities allowing real-time monitoring of the field test data from virtually anywhere in the world, and development of novel data processing techniques. Comprehensive testing was performed to systematically evaluate the performance of the fiber optic sensor systems in both lab and field environments.« less

  9. Acoustic detection of biosonar activity of deep diving odontocetes at Josephine Seamount High Seas Marine Protected Area.

    PubMed

    Giorli, Giacomo; Au, Whitlow W L; Ou, Hui; Jarvis, Susan; Morrissey, Ronald; Moretti, David

    2015-05-01

    The temporal occurrence of deep diving cetaceans in the Josephine Seamount High Seas Marine Protected Area (JSHSMPA), south-west Portugal, was monitored using a passive acoustic recorder. The recorder was deployed on 13 May 2010 at a depth of 814 m during the North Atlantic Treaty Organization Centre for Maritime Research and Experimentation cruise "Sirena10" and recovered on 6 June 2010. The recorder was programmed to record 40 s of data every 2 min. Acoustic data analysis, for the detection and classification of echolocation clicks, was performed using automatic detector/classification systems: M3R (Marine Mammal Monitoring on Navy Ranges), a custom matlab program, and an operator-supervised custom matlab program to assess the classification performance of the detector/classification systems. M3R CS-SVM algorithm contains templates to detect beaked whales, sperm whales, blackfish (pilot and false killer whales), and Risso's dolphins. The detections of each group of odontocetes was monitored as a function of time. Blackfish and Risso's dolphins were detected every day, while beaked whales and sperm whales were detected almost every day. The hourly distribution of detections reveals that blackfish and Risso's dolphins were more active at night, while beaked whales and sperm whales were more active during daylight hours.

  10. An evaluation of rain chemistry data for the John F. Kennedy Space Center, Florida and the University of Central Florida, Orlando

    NASA Technical Reports Server (NTRS)

    Madsen, Brooks C.; Dreschel, Thomas W.; Hinkle, C. Ross

    1986-01-01

    Concern over the effects of Space Shuttle launches prompted the initiation of a rather intense environmental monitoring program. The program included a precipitation monitoring network with 13 precipitation collection sites which were operated for various time periods to baseline precipitation chemistry at the John F. Kennedy Space Center (KSC). One additional site was also established as a remote background site on the Univ. of Central Florida (UCF) campus. One of the 13 sites was converted to a National Atmospheric Deposition Program (NADP) station. Collections and analyses of samples were performed using a number of methodologies during the monitoring period. An evaluation of the data for comparability and utility for acid rain research was performed using the anion/cation, measured conductivity, calculated conductivity, Cl/Na, and Mg/Na ratios. Data collected at all KSC sites between 1977 and 1981, from 1983 to 1985 at the NADP site and at UCF to 1985 are comparable and appropriate for determining acid rain trends. Examination of those comparable data showed a fairly stable pH between 1977 and 1982 and an increase of 0.2 pH units which was observed as an incremental increase between 1982 and 1983 at KSC and UCF.

  11. 40 CFR 60.2865 - How must I monitor opacity for air curtain incinerators?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emissions Guidelines and Compliance Times for Commercial and Industrial Solid Waste Incineration Units Model Rule-Air...

  12. EDUCTOR VAPOR RECOVERY UNIT

    EPA Science Inventory

    The U.S. Environmental Protection Agency (EPA) Environmental Technology Verification (ETV) program evaluates the performance of innovative air, water, pollution prevention and monitoring technologies that have the potential to improve human health and the environment. This techn...

  13. 24 CFR 58.18 - Responsibilities of States assuming HUD environmental responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... enforcement program for post-review actions on environmental reviews and monitor compliance with any...); and perform other related responsibilities regarding releases of funds. (b) Fulfill the state role in...

  14. FY 1987 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less

  15. Assessment of Current Inservice Inspection and Leak Monitoring Practices for Detecting Materials Degradation in Light Water Reactors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anderson, Michael T.; Simonen, Fredric A.; Muscara, Joseph

    2016-09-01

    An assessment was performed to determine the effectiveness of existing inservice inspection (ISI) and leak monitoring techniques, and recommend improvements, as necessary, to the programs as currently performed for light water reactor (LWR) components. Information from nuclear power plant (NPP) aging studies and from the U. S. Nuclear Regulatory Commission’s Generic Aging Lessons Learned (GALL) report (NUREG-1801) was used to identify components that have already experienced, or are expected to experience, degradation. This report provides a discussion of the key aspects and parameters that constitute an effective ISI program and a discussion of the basis and background against which themore » effectiveness of the ISI and leak monitoring programs for timely detection of degradation was evaluated. Tables based on the GALL components were used to systematically guide the process, and table columns were included that contained the ISI requirements and effectiveness assessment. The information in the tables was analyzed using histograms to reduce the data and help identify any trends. The analysis shows that the overall effectiveness of the ISI programs is very similar for both boiling water reactors (BWRs) and pressurized water reactors (PWRs). The evaluations conducted as part of this research showed that many ISI programs are not effective at detecting degradation before its extent reached 75% of the component wall thickness. This work should be considered as an assessment of NDE practices at this time; however, industry and regulatory activities are currently underway that will impact future effectiveness assessments. A number of actions have been identified to improve the current ISI programs so that degradation can be more reliably detected.« less

  16. Quality of pancreatic transplant program assessment using a risk-adjusted cumulative sum chart: experience from a single, small center.

    PubMed

    Grochowiecki, T; Jakimowicz, T; Grabowska-Derlatka, L; Szmidt, J

    2014-10-01

    The high rate of complication after pancreas transplantation not only had an impact on recipient quality of life and survival but also had significant financial implications. Thus, monitoring transplant center performance was crucial to indentifying changes in clinical practice that result in quality deterioration. To evaluate retrospectively the quality of the single, small pancreatic transplant program and to establish prospective monitoring of the center using risk-adjusted cumulative sum (CUSUM). From 1988 to 2014, 119 simultaneous pancreas and the kidney transplantations (SPKTx) were performed. The program was divided into 3 eras, based on surgical technique and immunosuppression. Analyses of the 15 fatal outcomes due to complication from pancreatic graft were performed. The risk model was developed using multivariable logistic regression analysis based on retrospective data of 112 SPKTx recipients. The risk-adjusted 1-sided CUSUM chart was plotted for retrospective and prospective events. The upper control limit was set to 2. There were 2 main causes of death: multiorgan failure (73.3%; 11/15) and septic hemorrhage (26.7%; 4/15). Quality analysis using the CUSUM chart revealed that the process was not homogeneous; however, no significant signal of program deterioration was obtained and the performance of the whole program was within the settled control limit. For a single pancreatic transplant center. The risk-adjusted CUSUM chart was a useful tool for quality program assessment. It could support decision making during traditional surgical morbidity and mortality conferences. For small transplant centers, increasing the sensitivity of the CUSUM method by lowering the upper control limit should be considered. However, an individual assessment approach of the for particular centers is recommended.

  17. NATO and U.S. Ballistic Missile Defense Programs: Divergent or Convergent Paths?

    DTIC Science & Technology

    2008-12-01

    PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING /MONITORING AGENCY NAME(S) AND ADDRESS(ES) N /A 10. SPONSORING/MONITORING AGENCY...Gray, 280. 36 n alliances. insecurity are the norm and periods of peace are more akin to interwar...Destruction, ed. Janne E. Nolan, Bernard I. Finel and Brian D. Finlay (New York: Century Foundation Press, 2003), 204. 118 “Iran,” The European

  18. 40 CFR 60.4410 - How do I establish a valid parameter range if I have chosen to continuously monitor parameters?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false How do I establish a valid parameter range if I have chosen to continuously monitor parameters? 60.4410 Section 60.4410 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of...

  19. All That Money and for What Purpose? Examining Selected State Departments' of Education Accountability for Implementation, Monitoring, and Evaluation of Supplemental Education Services

    ERIC Educational Resources Information Center

    Giles, Bethany A.

    2013-01-01

    This study examined the accountability of selected state departments of education on how they implemented, monitored, and evaluated Supplemental Education Services (SES). No Child Left Behind (NCLB) requires low-performing Title I schools to use federal funds to extend the school day for at-risk children by providing SES afterschool programs. This…

  20. Evaluation of a women group led health communication program in Haryana, India.

    PubMed

    Kaur, Manmeet; Jaswal, Nidhi; Saddi, Anil Kumar

    2017-12-01

    Sakshar Mahila Smooh (SMS) program was launched in rural areas of Haryana in India during 2008. A total of 6788 SMSs, each having 5-10 literate women, were equipped to enhance health communication. We carried out process evaluation of this program as an external agency. After a review of program documents, a random sample survey of Auxiliary Nurse Midwives (ANMs), SMS members, and village women was conducted. Out of four divisions of the state, one was randomly chosen, which had five districts. From 330 randomly chosen villages, 283 ANMs, 1164 SMS members, and 1123 village women were interviewed using a semi- structured interview schedule. Program inputs, processes, and outputs were compared in the five districts. Chi square was used for significance test. In the sampled division, out of 2009 villages, 1732 (86%) had functional SMS. In three years, SMS conducted 15036 group meetings, 2795 rallies, 2048 wall writings, and 803 competitions, and 44.5% of allocated budget was utilized. Most ANMs opined that SMSs are better health communicators. SMS members were aware about their roles and responsibilities. Majority of village women reported that SMS carry out useful health education activities. The characteristics of SMS members were similar but program performance was better in districts where health managers were proactive in program planning and monitoring. SMS Program has communicated health messages to majority of rural population, however, better planning & monitoring can improve program performance. Copyright © 2017 Elsevier Ltd. All rights reserved.

Top