Sample records for performance plan fy

  1. National Highway Traffic Safety Administration FY 1995 Performance Plan

    DOT National Transportation Integrated Search

    1994-09-01

    The NHTSA Fiscal Year 1995 performance plan for the Government Performance and Results Act of 1993 (GPRA) is the second in the three year pilot phase of the Act. This plan differs from the FY 1994 plan in two respects: 1) it uses a different "perform...

  2. FY 2016 Annual Performance Report

    EPA Pesticide Factsheets

    Presents detailed performance results, as measured against the targets established in EPA’s FY 2016 Annual Plan and Budget. The Executive Overview section analyzes key performance outcomes and links to FY 2016 program evaluations.

  3. FY 2017 Annual Performance Report (APR)

    EPA Pesticide Factsheets

    Presents detailed performance results, as measured against the targets established in EPA’s FY 2017 Annual Plan and Budget. The Executive Overview section analyzes key performance outcomes and links to FY 2017 program evaluations.

  4. FY 2015 Annual Performance Report

    EPA Pesticide Factsheets

    Presents detailed performance results, as measured against the targets established in EPA’s FY 2015 Annual Plan and Budget. The Executive Overview section analyzes key performance outcomes and links to FY 2015 program evaluations.

  5. Government Performance and Results Act: Performance plan FY 1999, U.S. Nuclear Regulatory Commission. Volume 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fuches, J.L.

    1998-02-01

    The Nuclear Regulatory Commission`s (NRC) strategic plan [NUREG-1614, Vol. 1, September 1997] establishes a strategic framework that will guide future decision-making and will help the NRC continue to meet its responsibility for protecting public health and safety, promoting the common defense and security, and protecting the environment. This performance plan complements the agency`s strategic plan by setting annual goals with measurable target levels of performance for FY 1999, as required by the Government Performance and Results Act. No significant contribution was made to the preparation of the performance plan by any non-Federal entity. However, a contractor was used to helpmore » facilitate discussions and resolution of issues. Within six months after the close of FY 1999, the NRC will submit to the President and the Congress a report on program performance for FY 1999. This performance report will review the success of the agency in achieving the performance goals established for FY 1999. Where those goals have been achieved, the underlying assumptions and strategies will be examined to ensure that continued applicability is warranted in the future. If any of the FY 1999 performance goals are not met, the agency will conduct a thorough analysis of why it did not meet the goal and the actions necessary to meet-the goal in the future. One result of this analysis will be the documentation of plans and schedules for achieving the established performance goal. If the analysis should indicate that the performance goal is impractical or infeasible, the performance report will document why that is the case and what action is recommended.« less

  6. High performance computing and communications: FY 1997 implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-12-01

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage, with bipartisan support, of the High-Performance Computing Act of 1991, signed on December 9, 1991. The original Program, in which eight Federal agencies participated, has now grown to twelve agencies. This Plan provides a detailed description of the agencies` FY 1996 HPCC accomplishments and FY 1997 HPCC plans. Section 3 of this Plan provides an overview of the HPCC Program. Section 4 contains more detailed definitions of the Program Component Areas, with an emphasis on the overall directions and milestones planned for each PCA. Appendix A providesmore » a detailed look at HPCC Program activities within each agency.« less

  7. U.S. Department of Education FY 2009 Annual Performance Report

    ERIC Educational Resources Information Center

    US Department of Education, 2010

    2010-01-01

    The United States Department of Education's "Annual Performance Report" (APR) for fiscal year (FY) 2009 provides detailed information on how the outcomes of the strategic performance measures identified in its "FY 2007-2012 Strategic Plan" and updated in the "Fiscal Year 2008 Performance and Accountability Report"…

  8. National Water Program FY 2015 Performance, Trends and Best Practices Report

    EPA Pesticide Factsheets

    This Report includes final FY 2015 performance data for all U.S. Environmental Protection Agency (EPA) National Water Program measures included in EPA's 2014-2018 Strategic Plan and the FY 2015 National Water Program Guidance Addendum.

  9. National Water Program Performance FY 2017 Trends, and Best Practices Report

    EPA Pesticide Factsheets

    This report includes FY 2017 performance data for all U.S. Environmental Protection Agency (EPA) National Water Program measures included in EPA's 2014-2018 Strategic Plan and the FY 2016-2017 National Water Program Guidance.

  10. U.S. Department of Education FY 2010 Annual Performance Report

    ERIC Educational Resources Information Center

    US Department of Education, 2011

    2011-01-01

    This paper presents the U.S. Department of Education's Fiscal Year (FY) "2010 Annual Performance Report" (APR). This report provides detailed information on: (1) the status of strategic goals, and (2) the outcomes of the strategic performance measures identified in the Department's "FY 2007-2012 Strategic Plan" and updated previously in the "FY…

  11. An Analysis of the Economic Assumptions Underlying Fiscal Plans FY1981 - FY1984.

    DTIC Science & Technology

    1986-06-01

    OF THE ECONOMIC ASSUMPTIONS UNDERLYING FISCAL PLANS FY1981 - FY1984 by Robert Welch Beck June 1986 Thesis Advisor: P. M. CARRICK Approved for public ...DOWGRDIN SHEDLEApproved for public releace; it - 2b ECLSSIICAIONI DWNGAD G SHEDLEbut ion is unlimited. 4! PERFORMING ORGANIZATION REPORT NUMBER(S) S...SECURITY CLASSIFICATION OF T4𔃿 PAC~E All other editions are obsolete Approved for public release; distribution is unlimited. An Analysis of the

  12. U.S. Department of Education FY 2010 Summary of Performance and Financial Information

    ERIC Educational Resources Information Center

    US Department of Education, 2011

    2011-01-01

    This paper presents the U.S. Department of Education's Fiscal Year (FY) "2010 Summary of Performance and Financial Information." FY 2010 was a transition year for the Department as it moves to a new strategic plan. The Department is still firmly committed to its mission of promoting achievement and preparation for global competitiveness…

  13. Federal Student Aid (FSA) Five-Year Strategic Plan. FY 2004-2008

    ERIC Educational Resources Information Center

    US Department of Education, 2004

    2004-01-01

    The FSA Five-Year Strategic Plan is a roadmap for FY 2004-2008 that identifies five long-range strategic objectives, tactical short-term goals, and performance management initiatives. In working toward the goals outlined in the plan, FSA will address a number of key challenges, including legacy system migration, business process re-engineering,…

  14. Enhancing The National Map Through Tactical Planning and Performance Monitoring

    USGS Publications Warehouse

    ,

    2008-01-01

    Tactical planning and performance monitoring are initial steps toward improving 'the way The National Map works' and supporting the U.S. Geological Survey (USGS) Science Strategy. This Tactical Performance Planning Summary for The National Map combines information from The National Map 2.0 Tactical Plan and The National Map Performance Milestone Matrix. The National Map 2.0 Tactical Plan is primarily a working document to guide The National Map program's execution, production, and metrics monitoring for fiscal years (FY) 2008 and 2009. The Tactical Plan addresses data, products, and services, as well as supporting and enabling activities. The National Map's 2-year goal for FY 2008 and FY 2009 is to provide a range of geospatial products and services that further the National Spatial Data Infrastructure and underpin USGS science. To do this, the National Geospatial Program will develop a renewed understanding during FY 2008 of key customer needs and requirements, develop the infrastructure to support The National Map business model, modernize its business processes, and reengineer its workforce. Priorities for The National Map will be adjusted if necessary to respond to changes to the project that may impact resources, constrain timeframes, or change customer needs. The supporting and enabling activities that make it possible to produce the products and services of The National Map will include partnership activities, improved compatibility of systems, outreach, and integration of data themes.

  15. DOT Performance Plan FY 1999

    DOT National Transportation Integrated Search

    1999-01-01

    The Department of Transportation Performance Plan is a companion piece to the DOT Strategic Plan and to the DOT Fiscal Year 1999 Budget Request. The Performance Plan defines those performance indicators and goals that will be used to mark progress to...

  16. Fiscal Year 2007 Program Performance Plan

    ERIC Educational Resources Information Center

    US Department of Education, 2006

    2006-01-01

    The strategic goals and objectives set forth in the Department of Education's "FY (Fiscal Year) 2002-2007 Strategic Plan" form the context for the broad outcomes that the Department believes should characterize American education. The Department administers more than 150 programs in support of these goals and objectives. This "FY 2007 Program…

  17. Department of Defense Performance and Accountability Report, Fiscal Year 2006

    DTIC Science & Technology

    2006-11-15

    FY 2006 with a total of 35, resulting in a net gain of one material weakness over FY 2005. Each weakness and their corrective action plans are...held due to statutory requirements for use in national defense, conservation, or national emergencies. The Annual Materials Plan lists the maximum...of non- materiality instances where planning for periods of crisis were not fully developed. (Office of the Under Secretary of Defense

  18. Metrication report to the Congress

    NASA Technical Reports Server (NTRS)

    1991-01-01

    NASA's principal metrication accomplishments for FY 1990 were establishment of metrication policy for major programs, development of an implementing instruction for overall metric policy and initiation of metrication planning for the major program offices. In FY 1991, development of an overall NASA plan and individual program office plans will be completed, requirement assessments will be performed for all support areas, and detailed assessment and transition planning will be undertaken at the institutional level. Metric feasibility decisions on a number of major programs are expected over the next 18 months.

  19. Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

    DTIC Science & Technology

    2016-09-21

    some observers regarding the current and future size and capabilities of the Navy. The Navy’s proposed FY2017 budget requests funding for the...An October 2015 Congressional Budget Office (CBO) report on the Navy’s FY2015 30-year shipbuilding plan estimates that the plan would require 11.5...shipbuilding budget , its proposed FY2017-FY2021 five-year shipbuilding plan, and its 30-year (FY2017-FY2046) shipbuilding plan include the following:  the

  20. Final report : oceanic surveillance and navigation analysis, FY 71.

    DOT National Transportation Integrated Search

    1971-06-01

    The report summarizes the oceanic surveillance and navigation analysis performed at Transportation Systems Center under PPA FA-04 for FY 71. Three major efforts are reviewed and discussed herein: summary of the North Atlantic Systems Planning Group c...

  1. 2013 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada; Review of the Performance Assessments and Composite Analyses

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shott, Gregory

    2014-03-01

    The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part ofmore » the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2013. This annual summary report presents data and conclusions from the FY 2013 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2013 include the following: • Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2013 • Evaluation of new or revised waste streams by special analysis • Development of version 4.115 of the Area 5 RWMS GoldSim PA/CA model The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2013 review of operations, facility design, closure plans, monitoring results, and R&D results for the Area 3 RWMS indicates no changes that would impact PA validity. The conclusion of the annual review is that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to the revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and R&D activities indicates that no significant changes have occurred. The FY 2013 PA results, generated with the Area 5 RWMS v4.115 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2013. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter the CAs results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Yucca Flat Underground Test Area (Corrective Action Unit [CAU] 97) source term, is scheduled for FY 2024, following the completion of the Corrective Action Decision Document/Corrective Action Plan in FY 2015. Inclusion of the Frenchman Flat Underground Test Area (CAU 98) results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the CAU 98 Closure Report in FY 2015. Near-term R&D efforts will focus on continuing development of the PA, CA, and inventory models for the Area 3 and Area 5 RWMS.« less

  2. 78 FR 11685 - Public Availability of FY 2011 Service Contract Inventory Analysis, FY 2012 Service Contract...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-19

    ... Analysis, FY 2012 Service Contract Inventory, and FY 2012 Service Contract Inventory Planned Analysis for... of the availability of the FY 2011 Service Contract Inventory Analysis, the FY 2012 Service Contract Inventory, and the FY 2012 Service Contract Inventory Planned Analysis. The FY 2011 inventory analysis...

  3. Defense Technology Objectives of the Joint Warfighting Science and Technology Plan and the Defense Technology Area Plan.

    DTIC Science & Technology

    1997-01-01

    isolated targets, significantly reduce false alarms ( PFA = 0.01/km2), and recognize force structure (e.g., maneuver battalions). During FY97, a laboratory...probability of false alarm ( Pfa ) of 0.3 at an altitude of 500-1,000 ft and at airspeeds of 60-100 kn is planned. Enhanced COBRA optics-including a...hibiting the desired properties and initiate agent sorption assessments. The FY00 goal is to com- plete performance evaluations of candidate

  4. BRAC, What Will it Cost

    DTIC Science & Technology

    1992-04-10

    Devens - Fort Huachuca FY 91 FY 95 Fort McClellan FY 92 FY 96 Fort Chaffee FY 92 FY 97 Cameron Station FY 91 FY 95 53 Stand Alone Housing Sites FY 90 FY...Army, Headquarters Forces Command, &as Realianment and Closure Implementation Plan - Fort Devens Closure Package, Implementation Plan, Fort McPherson, GA...Classification) RAC , What Will It Cost? 12. PERSONAL AUTHOR(S) TLIN, Robert B. LTC, USA 13. TYPE OF REPORT 13b. TIME COVERED 14. DATE OF REPORT (Year

  5. 2012 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shott, G.

    2013-03-18

    The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part ofmore » the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2012. This annual summary report presents data and conclusions from the FY 2012 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2012 include the following: Release of a special analysis for the Area 3 RWMS assessing the continuing validity of the PA and CA; Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2012; Evaluation of new or revised waste streams by special analysis; and Development of version 4.114 of the Area 5 RWMS GoldSim PA model. The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2012 review of operations, facility design, closure plans, monitoring results, and R&D results for the Area 3 RWMS indicates no changes that would impact PA validity. A special analysis using the Area 3 RWMS v2.102 GoldSim PA model was prepared to update the PA results for the Area 3 RWMS in FY 2012. The special analysis concludes that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to the revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and R&D activities indicates no significant changes other than an increase in the inventory disposed. The FY 2012 PA results, generated with the Area 5 RWMS v4.114 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2012. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter CA results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Underground Test Area source term (Corrective Action Unit [CAU] 97), is scheduled for FY 2024, following the completion of the Yucca Flat CAU 97 Corrective Action Decision Document/Corrective Action Plan in FY 2016. Inclusion of the Frenchman Flat CAU 98 results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the CAU 98 closure report in FY 2015. Near-term R&D efforts will focus on continuing development of the Area 3 and Area 5 RWMS GoldSim PA/CA and inventory models.« less

  6. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration. Division of Fish and Wildlife.

    1988-11-01

    The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or moremore » BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.« less

  7. FY 2011 Educational Facilities Master Plan & the FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2010

    2010-01-01

    The FY 2011 Educational Facilities Master Plan (Master Plan) and FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…

  8. Fiscal year 2004/2005 performance plan

    DOT National Transportation Integrated Search

    2003-01-01

    This Performance Plan for the Federal Highway Administration (FHWA) Office of Research, Development, and Technology (RD&T) describes the research that will be conducted and the products and services that will be provided in fiscal years (FY) 2004/200...

  9. FY 2013 Educational Facilities Master Plan and the FY 2013-2018 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2012

    2012-01-01

    The FY 2013 Educational Facilities Master Plan (Master Plan) and the FY 2013-2018 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of…

  10. FY 2012 Educational Facilities Master Plan and the Amended FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2011

    2011-01-01

    The FY 2012 Educational Facilities Master Plan (Master Plan) and Amendments to the FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the…

  11. FY 2007 Educational Facilities Master Plan and the FY 2007-2012 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2006

    2006-01-01

    The FY 2007 Educational Facilities Master Plan (Master Plan) and FY 2007-2012 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…

  12. Structural Mechanics Division research and technology plans for FY 1990 and accomplishments for FY 1989

    NASA Technical Reports Server (NTRS)

    Bales, Kay S.

    1990-01-01

    The Objectives, FY 1990 Plans, Approach, and FY 1990 Milestones for the Structural Mechanics Division's research programs are presented. FY 1989 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.

  13. Structures and Dynamics Division research and technology plans for FY 1986 and accomplishments for FY 1985

    NASA Technical Reports Server (NTRS)

    Bales, K. S.

    1986-01-01

    Presented are the Objectives, FY 1986 Plans, Approach, and FY 1986 Milestones for the Structures and Dynamics Division's research programs. FY 1985 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.

  14. Navy-Marine Corps Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues for Congress

    DTIC Science & Technology

    2005-08-02

    called LHD-8 and is also procuring new LPD-17 class amphibious ships. A total of 12 LPD-17s were originally planned , but the FY2006-FY2011 Future Years...Defense Plan (FYDP) proposes reducing that figure to nine, with the final two to be procured in FY2006 and FY2007. The FY2006-FY2011 FYDP also calls...developments have caused the Navy to reconsider its plans for procuring amphibious ships and maritime prepositioning ships. One is a new concept of operations

  15. Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

    DTIC Science & Technology

    2014-08-01

    submarines (SSBNs) 12b 12-14b 12b 12b 14 14 14 14 14 Cruise missile submarines (SSGNs) 0c 0-4c 4c 0c 4 4 4 4 2 or 4d Attack submarines ( SSNs ...aircraft carrier 1 1 Virginia ( SSN -774) class attack submarine 2 2 2 2 2 10 Arleigh Burke (DDG-51) class destroyer 2 2 2 2 2 10 Littoral Combat Ship...shows the Navy’s FY2015 30-year (FY2015-FY2044) shipbuilding plan. Table 3. Navy FY2015 30-Year (FY2015-FY2044) Shipbuilding Plan FY CVN LSC SSC SSN

  16. Space Transportation Propulsion Systems

    NASA Technical Reports Server (NTRS)

    Liou, Meng-Sing; Stewart, Mark E.; Suresh, Ambady; Owen, A. Karl

    2001-01-01

    This report outlines the Space Transportation Propulsion Systems for the NPSS (Numerical Propulsion System Simulation) program. Topics include: 1) a review of Engine/Inlet Coupling Work; 2) Background/Organization of Space Transportation Initiative; 3) Synergy between High Performance Computing and Communications Program (HPCCP) and Advanced Space Transportation Program (ASTP); 4) Status of Space Transportation Effort, including planned deliverables for FY01-FY06, FY00 accomplishments (HPCCP Funded) and FY01 Major Milestones (HPCCP and ASTP); and 5) a review current technical efforts, including a review of the Rocket-Based Combined-Cycle (RBCC), Scope of Work, RBCC Concept Aerodynamic Analysis and RBCC Concept Multidisciplinary Analysis.

  17. Structures and Dynamics Division research and technology plans for FY 1988 and accomplishments for FY 1987

    NASA Technical Reports Server (NTRS)

    Bales, Kay S.

    1988-01-01

    Presented are the Objectives, FY 1988 Plans, Approach, and FY 1988 Milestones for the Structures and Dynamics Division (Langley Research Center) research programs. FY 1987 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.

  18. Structures and Dynamics Division research and technology plans for FY 1987 and accomplishments for FY 1986

    NASA Technical Reports Server (NTRS)

    Bales, Kay S.

    1987-01-01

    This paper presents the Objectives, FY 1987 Plans, Approach, and FY 1987 Milestones for the Structures and Dynamics Division's research programs. FY 1986 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.

  19. Structures and Dynamics Division research and technology plans for FY 1985 and accomplishments for FY 1984

    NASA Technical Reports Server (NTRS)

    Bales, K. S.

    1985-01-01

    The objectives, FY 1985 plans, approach, and FY 1985 milestones for the Structures and Dynamics Division's research programs are presented. The FY 1984 accomplishments are presented where applicable. This information is useful in program coordination with other government organizations in areas of mutual interest.

  20. ANL site response for the DOE FY1994 information resources management long-range plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory`s ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory`s previous submissions. The response contains both narrative and tabular material.more » It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory`s Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, ``Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.« less

  1. ANL site response for the DOE FY1994 information resources management long-range plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory's ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory's previous submissions. The response contains both narrative and tabular material.more » It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory's Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.« less

  2. Using Organizational Philosophy to Create a Self-Sustaining Compensation Plan Without Harming Academic Missions.

    PubMed

    Leverence, Robert; Nuttall, Richard; Palmer, Rachel; Segal, Mark; Wood, Alicia; Yancey, Fay; Shuster, Jonathon; Brantly, Mark; Hromas, Robert

    2017-08-01

    Academic physician reimbursement has moved to productivity-based compensation plans. To be sustainable, such plans must be self-funding. Additionally, unless research and education are appropriately valued, faculty involved in these efforts will become disillusioned, yet revenue generation in these activities is less robust than for clinical care activities. Faculty at the Department of Medicine, University of Florida Health, elected a committee of junior and senior faculty and division chiefs to restructure the compensation plan in fiscal year (FY) 2011. This committee was charged with designing a new compensation plan based on seven principles of organizational philosophy: equity, compensation coupled to productivity, authority aligned with responsibility, respect for all academic missions, transparency, professionalism, and self-funding in each academic mission. The new compensation plan was implemented in FY2013. A survey administered at the end of FY2015 showed that 61% (76/125) of faculty were more satisfied with this plan than the previous plan. Since the year before implementation, clinical relative value units per faculty increased 7% (from 3,458 in FY2012 to 3,704 in FY2015, P < .002), incentives paid per faculty increased 250% (from $3,191 in FY2012 to $11,153 in FY2015, P ≤ .001), and publications per faculty increased 15% (from 2.6 in FY2012 to 3.0 in FY2015, P < .001). Grant submissions, external funding, and teaching hours also increased per faculty but did not reach statistical significance. An important next step will be to incorporate quality metrics into the compensation plan, without affecting costs or throughput.

  3. Materials Division research and technology accomplishments for FY 87 and plans for FY 88

    NASA Technical Reports Server (NTRS)

    Brinkley, Kay L.

    1988-01-01

    The research program of the Materials Division is presented as FY 87 accomplishments and FY 88 plans. The accomplishments for each Branch are highlighted and plans are outlined. Publications of the Division are included by Branch. This material will be useful in program coordination with other government organizations, universities, and industries in areas of mutual interest.

  4. Materials Division research and technology accomplishments for FY 89 and plans for FY 90

    NASA Technical Reports Server (NTRS)

    Brinkley, Kay L.

    1990-01-01

    The research program of the Materials Division is presented as FY-89 accomplishments and FY-90 plans. The accomplishments for each Branch are highlighted and plans are outlined. Publications of the Division are included by Branch. This material will be useful in program coordination with other government organizations, universities, and industries in areas of mutual interest.

  5. Materials Division research and technical accomplishments for FY 1988 and plans for FY 1989

    NASA Technical Reports Server (NTRS)

    Brinkley, Kay L.

    1989-01-01

    The research program of the Materials Division is presented as FY-88 accomplishments and FY-89 plans. The accomplishments for each Branch are highlighted and plans are outlined. Publications of the Division are included by Branch. This material is useful in program coordination with other government organizations, universities, and industry in areas of mutual interest.

  6. 75 FR 15686 - NOAA'S Office of Ocean Exploration and Research (OER) Strategic Plan FY 2011-FY 2015

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-30

    ...-01] NOAA'S Office of Ocean Exploration and Research (OER) Strategic Plan FY 2011-FY 2015 AGENCY: Office of Ocean Exploration and Research (OER), Oceanic and Atmospheric Research (OAR), National Oceanic... comment. [[Page 15687

  7. Structural dynamics division research and technology accomplishments for FY 1993 and plans for FY 1994

    NASA Technical Reports Server (NTRS)

    Wynne, Eleanor C.

    1994-01-01

    The purpose is to present the Structural Dynamics Division's research accomplishments for F.Y. 1993 and research plans for F.Y. 1994. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5-year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  8. Structural dynamics division research and technology accomplishments for FY 1989 and plans for FY 1990

    NASA Technical Reports Server (NTRS)

    Smith, Jacqueline G.; Gardner, James E.

    1990-01-01

    The purpose is to present the Structural Dynamics Division's research accomplishments for FY 1989 and research plans for FY 1990. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  9. Loads and aeroelasticity division research and technology accomplishments for FY 1985 and plans for FY 1986

    NASA Technical Reports Server (NTRS)

    Gardner, J. E.; Dixon, S. C.

    1986-01-01

    The Langley Research Center Loads and Aeroelasticity Division's research accomplishments for FY85 and research plans for FY86 are presented. The rk under each branch (technical area) will be described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  10. Loads and Aeroelasticity Division research and technology accomplishments for FY 1986 and plans for FY 1987

    NASA Technical Reports Server (NTRS)

    Gardner, James E.; Dixon, S. C.

    1987-01-01

    The Loads and Aeroelasticity Division's research accomplishments for FY 86 and research plans for FY 87 are presented. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  11. FY 1999 Annual Self-Evaluation Report of the Pacific Northwest National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Randy R. LaBarge

    1999-11-05

    This is a report of the Pacific Northwest National Laboratory's (Pacific Northwest's) FY1999 Annual Self-Evaluation Report. This report summarizes our progress toward accomplishment of the critical outcomes, objectives, and performance indicators as delineated in the FY1999 Performance Evaluation & Fee Agreement. It also summarizes our analysis of the results of Pacific Northwest's Division and Directorate annual self-assessments, and the implementation of our key operational improvement initiatives. Together, these provide an indication of how well we have used our Integrated Assessment processes to identify and plan improvements for FY2000. As you review the report you will find areas of significantly positivemore » progress; you will also note areas where I believe the Laboratory could make improvements. Overall, however, I believe you will be quite pleased to note that we have maintained, or exceeded, the high standards of performance we have set for the Laboratory.« less

  12. Integration of academic and clinical performance-based faculty compensation plans: a system and its impact on an anaesthesiology department.

    PubMed

    Sakai, T; Hudson, M; Davis, P; Williams, J

    2013-10-01

    The current economic environment makes it difficult for academic institutions to maintain academic activities with necessary clinical coverage. Productivity-based faculty compensation is reported to improve clinical work output; however, the impact on academic productivity has not been fully described. An academic anaesthesiology department has used a comprehensive clinical and academic performance-based faculty compensation programme as fiscal year (FY) 2004. Faculty choosing to pursue an academic track can devote up to 80% of their time to non-clinical activities. Payment for this time is 'salary at risk', which is earned through a merit matrix system, which was newly developed to award points for various academic activities. Unclaimed portions of the salary at risk are absorbed into the department budget at the conclusion of the FY. Clinical activities are measured chiefly based on total hours of anaesthetic care. Academic full-time equivalents (FTEs) decreased by 12.0% in FY2005 (FTE of 16.0-14.1) but recovered to the baseline level in FY2006 and remained stable. Clinical FTE also decreased by 6.6% in FY2005 (FTE of 109.1-101.9), then increased in FY2006-FY2010. Increased clinical work output was observed among the clinical and academic faculty members. Each academic faculty member successfully earned their salary at risk in each FY. The annual number of peer-reviewed publications per academic FTE in original research increased from 0.31 (0.18) (FY2001-FY2003) to 0.73 (0.14) (FY2006-FY2011), P=0.024. Integration of clinical and academic performance-based faculty compensation systems is feasible and can be efficacious in a large academic anaesthesiology department.

  13. 76 FR 55908 - Farm Credit System Insurance Corporation Board; Regular Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-09

    ... FCSIC Report on System Performance Open Session A. Approval of Minutes June 21, 2011 B. Business Reports... Performance Plan C. New Business Annual Performance Plan FY 2012-2013 Proposed 2012 and 2013 Budgets Insurance... concludes its business. FOR FURTHER INFORMATION CONTACT: Dale L. Aultman, Secretary to the Farm Credit...

  14. An Analysis of the Return on Investment of Navy Enterprise Resource Planning as Implemented Navy-Wide FY04-FY15

    DTIC Science & Technology

    2011-06-01

    companies led the way for companies to move to ERP in order to address potential Y2K issues. As it became clear that the date turnover from December...customer responsiveness, integration, standardization, cost reduction, flexibility, globalization, Y2K , business performance, and supply/demand chain

  15. 78 FR 55257 - Request for Comments on the Draft Departmental Strategic Plan for FY 2014-2018

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-10

    ... strategic planning consultation process is an opportunity for the Department to refine and strengthen the... and Human Services, Office of the Assistant Secretary for Planning and Evaluation, Strategic Planning... planning process under the Government Performance and Results Modernization Act of 2010 (GPRA-MA) (Pub. L...

  16. Research and technology plans for FY 1989 and accomplishments for FY 1988. [Structural Mechanics Division

    NASA Technical Reports Server (NTRS)

    Bales, Kay S.

    1989-01-01

    The Objectives, FY 1989 Plans, Approach, and FY 1989 Milestones for the Structural Mechanics Division's research programs are presented. Fiscal year 1988 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.

  17. FY 1987 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less

  18. Structural dynamics division research and technology accomplishments for FY 1992 and plans for FY 1993

    NASA Technical Reports Server (NTRS)

    Wynne, Eleanor C.

    1993-01-01

    The purpose of this paper is to present the Structural Dynamics Division's research accomplishments for F.Y. 1992 and research plans for F.Y. 1993. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5-year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  19. Loads and aeroelasticity division research and technology accomplishments for FY 1987 and plans for FY 1988

    NASA Technical Reports Server (NTRS)

    Dixon, S. C.; Gardner, James E.

    1988-01-01

    The purpose of this paper is to present the Loads and Aeroelasticity Division's research accomplishments for FY87 and research plans for FY88. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  20. Annual Plan for the EPA - FY 2011

    EPA Pesticide Factsheets

    This plan identifies mandated and selected assignment topics continuing from FY 2010 and scheduled to be started during FY 2011, providing for unforeseen work requested by Agency leadership and Congress, and through ongoing OIG Hotline activities.

  1. DoD’s Strategic Sustainability Performance Plan: Part of a Comprehensive Strategy to Address Mission Risks and Lower Costs

    DTIC Science & Technology

    2011-05-09

    Greenhouse Gas Emissions from Employee Air Travel Reduced 15% by FY 2020 Relative to FY 2011 • 30% of Eligible Employees Teleworking at Least Once a Week...that provide direct mission benefits High return on investment Look for activities that contribute to more than one goal (energy, water, green

  2. Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

    DTIC Science & Technology

    2016-03-17

    observers regarding the current and future size and capabilities of the Navy. The Navy’s proposed FY2017 budget requests funding for the procurement...average of about $15.2 billion per year during the final 10 years of the plan. An October 2015 Congressional Budget Office (CBO) report on the Navy’s...Potential issues for Congress in reviewing the Navy’s proposed FY2017 shipbuilding budget , its proposed FY2017-FY2021 five-year shipbuilding plan

  3. Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks (DST) FY2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    JENSEN, C.E.

    2000-01-10

    This document facilitates the ultrasonic examination of Hanford double-shell tanks. Included are a plan for engineering activities (individual responsibilities), plan for performance demonstration testing, and a plan for field activities (tank inspection). Also included are a Statement of Work for contractor performance of the work and a protocol to be followed should tank flaws that exceed the acceptance criteria be discovered.

  4. Annual Plan for the EPA - FY 2012

    EPA Pesticide Factsheets

    This plan identifies mandated and selected assignment topics continuing from fiscal year (FY) 2011 and scheduled to be started during FY 2012, providing for unforeseen work that may be requested by hotline complaints, EPA leadership, and Congress.

  5. Ernest Orlando Lawrence Berkeley National Laboratory Institutional Plan FY 2000-2004

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chartock, Mike; Hansen, Todd

    1999-08-01

    The FY 2000-2004 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab, the Laboratory) mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. To advance the Department of Energy's ongoing efforts to define the Integrated Laboratory System, the Berkeley Lab Institutional Plan reflects the strategic elements of our planning efforts. The Institutional Plan is a management report that supports the Department of Energy's mission and programs and is an element of the Department of Energy's strategicmore » management planning activities, developed through an annual planning process. The Plan supports the Government Performance and Results Act of 1993 and complements the performance-based contract between the Department of Energy and the Regents of the University of California. It identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by Berkeley Lab's scientific and support divisions.« less

  6. Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

    DTIC Science & Technology

    2016-05-27

    observers regarding the current and future size and capabilities of the Navy. The Navy’s proposed FY2017 budget requests funding for the procurement...average of about $15.2 billion per year during the final 10 years of the plan. An October 2015 Congressional Budget Office (CBO) report on the Navy’s...Potential issues for Congress in reviewing the Navy’s proposed FY2017 shipbuilding budget , its proposed FY2017-FY2021 five-year shipbuilding plan, and

  7. Navy-Marine Corps Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues for Congress

    DTIC Science & Technology

    2005-05-31

    building a new amphibious assault ship called LHD-8 and is also procuring new LPD-17 class amphibious ships. A total of 12 LPD-17s were originally planned ...but the FY2006-FY2011 Future Years Defense Plan (FYDP) proposes reducing that figure to nine, with the final two to be procured in FY2006 and FY2007...Three developments have caused the Navy to reconsider its plans for procuring amphibious ships, maritime prepositioning ships, and connector ships

  8. Department of the Navy Transformation Plan: FY 2014-2016

    Science.gov Websites

    alignment don business priorities (fy14-16) strategic opportunities for transformation don institutional Closing... summary don transformation model Download PDF Submit an Idea Department of the Navy Transformation Plan FY 2014-2016

  9. WEC-SIM Validation Testing Plan FY14 Q4.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ruehl, Kelley Michelle

    2016-02-01

    The WEC-Sim project is currently on track, having met both the SNL and NREL FY14 Milestones, as shown in Table 1 and Table 2. This is also reflected in the Gantt chart uploaded to the WEC-Sim SharePoint site in the FY14 Q4 Deliverables folder. The work completed in FY14 includes code verification through code-to-code comparison (FY14 Q1 and Q2), preliminary code validation through comparison to experimental data (FY14 Q2 and Q3), presentation and publication of the WEC-Sim project at OMAE 2014 [1], [2], [3] and GMREC/METS 2014 [4] (FY14 Q3), WEC-Sim code development and public open-source release (FY14 Q3), andmore » development of a preliminary WEC-Sim validation test plan (FY14 Q4). This report presents the preliminary Validation Testing Plan developed in FY14 Q4. The validation test effort started in FY14 Q4 and will go on through FY15. Thus far the team has developed a device selection method, selected a device, and placed a contract with the testing facility, established several collaborations including industry contacts, and have working ideas on the testing details such as scaling, device design, and test conditions.« less

  10. Five-Year Plan (FY04-FY-08) for the Manufacturing Technology (ManTech) Program. Supplement to the FY03 - FY07 Plan

    DTIC Science & Technology

    2003-07-01

    magnetorheological (MRF) finishing to reduce surface roughness in half the time of previous processes . Improved image quality directly supports improved...affordably polish the inside surface of small tight free form optics to a finish on the order of 3 angstroms. • Demonstrate cycle time reduction...processes and controls for steel, titanium, and superalloys. FY2007: • Demonstrate an improved superfine finishing for optical components to

  11. Underground Test Area Fiscal Year 2014 Annual Quality Assurance Report Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krenzien, Susan

    2015-01-01

    This report is required by the Underground Test Area (UGTA) Quality Assurance Plan (QAP) and identifies the UGTA quality assurance (QA) activities from October 1, 2013, through September 30, 2014 (fiscal year [FY] 2014). All UGTA organizations—U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO); Desert Research Institute (DRI); Lawrence Livermore National Laboratory (LLNL); Los Alamos National Laboratory (LANL); National Security Technologies, LLC (NSTec); Navarro-Intera, LLC (N-I); and the U.S. Geological Survey (USGS)—conducted QA activities in FY 2014. The activities included conducting oversight assessments for QAP compliance, identifying findings and completing corrective actions, evaluating laboratory performance,more » and publishing documents. UGTA Activity participants conducted 25 assessments on topics including safe operations, QAP compliance, activity planning, and sampling. These assessments are summarized in Section 2.0. Corrective actions tracked in FY 2014 are presented in Appendix A. Laboratory performance was evaluated based on three approaches: (1) established performance evaluation programs (PEPs), (2) interlaboratory comparisons, or (3) data review. The results of the laboratory performance evaluations, and interlaboratory comparison results are summarized in Section 4.0. The UGTA Activity published three public documents and a variety of other publications in FY 2014. The titles, dates, and main authors are identified in Section 5.0. The Contract Managers, Corrective Action Unit (CAU) Leads, Preemptive Review (PER) Committee members, and Topical Committee members are listed by name and organization in Section 6.0. Other activities that affected UGTA quality are discussed in Section 7.0. Section 8.0 provides the FY 2014 UGTA QA program conclusions, and Section 9.0 lists the references not identified in Section 5.0.« less

  12. Training and Personnel Systems Technology R and D Program Description FY 93

    DTIC Science & Technology

    1992-07-24

    instructional strategies provide the best training in ICAT applications, and (c) demonstration of microcomputer authoring techniques for rapid development...learning strategies for language training, (b) develop a behavioral taxonomy to evaluate Military Intelligence (MI) performance and to characterize the...training requirements for collective tasks. In FY93, plans are to: (a) develop training strategies for sustaining command and control skills, and (b

  13. Idaho National Laboratory Integrated Safety Management System FY 2013 Effectiveness Review and Declaration Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hunt, Farren

    2013-12-01

    Idaho National Laboratory (INL) performed an Annual Effectiveness Review of the Integrated Safety Management System (ISMS), per 48 Code of Federal Regulations (CFR) 970.5223 1, “Integration of Environment, Safety and Health into Work Planning and Execution.” The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and identified target areas for focused improvements and assessments for Fiscal Year (FY) 2014. Results of the FY 2013 annual effectiveness review demonstrate that the INL’s ISMS program is “Effective” and continually improving and shows signs of being significantly strengthened. Although there have been unacceptable serious events in themore » past, there has also been significant attention, dedication, and resources focused on improvement, lessons learned and future prevention. BEA’s strategy of focusing on these improvements includes extensive action and improvement plans that include PLN 4030, “INL Sustained Operational Improvement Plan, PLN 4058, “MFC Strategic Excellence Plan,” PLN 4141, “ATR Sustained Excellence Plan,” and PLN 4145, “Radiological Control Road to Excellence,” and the development of LWP 20000, “Conduct of Research.” As a result of these action plans, coupled with other assurance activities and metrics, significant improvement in operational performance, organizational competence, management oversight and a reduction in the number of operational events is being realized. In short, the realization of the fifth core function of ISMS (feedback and continuous improvement) and the associated benefits are apparent.« less

  14. FTA multi-year research program plan (FY 2009 - FY 2013).

    DOT National Transportation Integrated Search

    2008-09-01

    The Multi-Year Research Program Plan (Program Plan), prepared by the Federal Transit Administrations (FTA) Office of : Research, Demonstration, and Innovation (TRI), is part of FTAs strategic planning process. It provides descriptive : summarie...

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    NREL's Site Sustainability Plan FY 2015 reports on sustainability plans for the lab for the year 2015 based on Executive Order Goals and provides the status on planned actions cited in the FY 2014 report.

  16. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1990.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1990-01-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operationmore » of hydroelectric generation in the Columbia River Basin. This document presents BPA's plans for implementing the Program during Fiscal Year (FY) 1990. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge progress and the success of Program implementation. The FY 1990 AIWP also follows the outline developed by the Policy Review Group (PRG) during Step 1 of initial cycle of the Implementation Planning Process (IPP), which is described in Section III. A number of new FY 1990 projects were still under review by the PRG as the AIWP went to press. These projects have been noted in Table 2, New FY 1990 Program Projects, and in the text of the AIWP. This AIWP has been organized and written to meet the specific needs of Program Action Items 10.1-10.3. The AIWP includes schedules with key milestones for FY 1990 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program. All BPA-funded Program projects discussed in the FY 1990 AIWP are listed in Tables 1 and 2 according to their status as of September 30, 1989. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-18) lists all projects which BPA plans to fund as ''new'' projects in FY 1990. ''Ongoing'' status indicates that the project started in FY 1989 or before, and that it is expected to continue in FY 1990. ''Deferred'' means that BPA implementation has been postponed to FY 1991 or later. ''Completed'' indicates completion during FY 1989. ''New'' denotes projects that BPA plans to start in FY 1990. One new FY 1990 project was included in the draft FY 1990 AIWP as a ''conditional'' project, as a result of PRG recommendations at the May 25, 1989, PRG meeting. If specified conditions are met, BPA will begin to implement the project in FY 1990. Section VII describes BPA's non-Program, internal support projects. These projects were not subject to review by the PRG and have been included in the AIWP to help the PRG and the public to better understand what BPA is doing.« less

  17. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2008-10-01

    planned 313-ship fleet calls for a 31-ship amphibious force that includes 10 LPD-17s, and the Marine Corps states that a 33-ship amphibious force that...state, reflects responsibilities assigned to Marine Corps forces in U.S. regional war plans . The Navy’s FY2009 30-year (FY2009-FY2038) shipbuilding plan ...13 Service Life Extensions for Amphibious Ships . . . . . . . . . . . . . . . . . . 13 Planned MPF(F) Squadron

  18. Structures and Dynamics Division: Research and technology plans for FY 1983 and accomplishments for FY 1982

    NASA Technical Reports Server (NTRS)

    Bales, K. S.

    1983-01-01

    The objectives, expected results, approach, and milestones for research projects of the IPAD Project Office and the impact dynamics, structural mechanics, and structural dynamics branches of the Structures and Dynamics Division are presented. Research facilities are described. Topics covered include computer aided design; general aviation/transport crash dynamics; aircraft ground performance; composite structures; failure analysis, space vehicle dynamics; and large space structures.

  19. San Diego transit five year plan update : FY 1982-1986

    DOT National Transportation Integrated Search

    1981-07-01

    The Five Year Plan Update constitutes the annual revision to the operating plan and capital program for the following five year planning period, presents its adopted budget and a specific operating plan and capital program for FY 1982 as well as less...

  20. Annual Plan - Fiscal Year 2010 (revised)

    EPA Pesticide Factsheets

    This plan identifies topics continuing from FY 2009 and the first half of FY 2010, and scheduled to be started in the second half of FY 2010, providing for unforeseen work in the latter part of the year directed by a new Inspector General, and from new EPA

  1. Human factors research plan for instrument procedures : FY12 version 1.1

    DOT National Transportation Integrated Search

    2012-06-19

    This research will support the development of instrument procedures for performance-based navigation (PBN) operations. These procedures include, but are not limited to, area navigation (RNAV) and required navigation performance (RNP) operations. The ...

  2. The NASA/DOE/DOD nuclear rocket propulsion project - FY 1991 status

    NASA Technical Reports Server (NTRS)

    Clark, John S.; Miller, Thomas J.

    1991-01-01

    NASA has initiated planning and critical technology development for nuclear rocket propulsion systems for Space Exploration Initiative missions to the moon and to Mars. Interagency agreements are being negotiated between NASA, the Department of Energy, and the Department of Defense for joint technology development activities. This paper summarizes the activities of the NASA project planning team in FY 1990 that led to the draft Nuclear Propulsion Project Plan, outlines the FY 1991 Interagency activities, and describes the current status of the project plan.

  3. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2008-05-06

    planned 313-ship fleet calls for a 31-ship amphibious force that includes 10 LPD-17s, and the Marine Corps states that a 33-ship amphibious force that...reflects responsibilities assigned to Marine Corps forces in U.S. regional war plans . The Navy’s FY2009 30-year (FY2009-FY2038) shipbuilding plan , if...extensions for existing amphibious ships, whether all the ships in the planned complementary Maritime Prepositionning Force of the Future (MPF[F

  4. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2008-04-23

    by Reuters, “but we are incorporating the lessons from this experience into our operational plans going forward for new ships in the design, planning ...Navy’s planned 313-ship fleet calls for a 31-ship amphibious force that includes 10 LPD-17s, and the Marine Corps states that a 33-ship amphibious...officials state, reflects responsibilities assigned to Marine Corps forces in U.S. regional war plans . The Navy’s FY2009 30-year (FY2009-FY2038) shipbuilding

  5. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1992.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1991-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operationmore » of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's plans for implementing the Program during Fiscal Year (FY) 1992. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Action Items 10.1-10.3. The AIWP includes schedules with key milestones for FY 1992 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of May 21, 1991. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-16) lists FY 1992 new-start projects. ''Ongoing'' status indicates that the project started in FY 1991 or before and that it is expected to continue through part or all of FY 1992. ''Deferred'' means that BPA implementation has been postponed to FY 1993 or later. ''Completed'' indicates completion during FY 1991. ''New'' denotes projects planned for BPA implementation in FY 1992. A number of projects are expected to begin in late FY 1991 and have been listed in Table 1 of the AIWP as ''Projected FY '91 Starts,'' based on their projected start dates. Several other projects are expected to end in late FY 1991. These projects have been listed in Table 1 as ''Projected FY '91 Completions,'' based on their projected completion dates.« less

  6. 78 FR 4150 - Update of NIOSH Nanotechnology Strategic Plan for Research and Guidance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-18

    ...; NIOSH-134-B] Update of NIOSH Nanotechnology Strategic Plan for Research and Guidance AGENCY: National... Nanotechnology Strategic Plan for Research and Guidance. SUMMARY: The National Institute for Occupational Safety... NIOSH FY2013-FY2016 nanotechnology strategic plan. This draft strategic plan (Protecting the...

  7. 75 FR 47346 - Draft Strategic Plan for FY 2010-2015

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-05

    ...://www.treas.gov/offices/management/budget/strategic-plan/2007-2012/strategic-plan2007-2012.pdf . The....ustreas.gov/offices/management/budget/strategic-plan/ and by clicking on the comment link. Comments may... DEPARTMENT OF THE TREASURY Draft Strategic Plan for FY 2010-2015 AGENCY: United States Department...

  8. Hanford Site Environmental Safety and Health Fiscal Year 2001 Budget-Risk management summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    REEP, I.E.

    1999-05-12

    The Hanford Site Environment, Safety and Health (ES&H) Budget-Risk Management Summary report is prepared to support the annual request to sites in the U.S. Department of Energy (DOE) Complex by DOE, Headquarters. The request requires sites to provide supplementary crosscutting information related to ES&H activities and the ES&H resources that support these activities. The report includes the following: (1) A summary status of fiscal year (FY) 1999 ES&H performance and ES&H execution commitments; (2)Status and plans of Hanford Site Office of Environmental Management (EM) cleanup activities; (3) Safety and health (S&H) risk management issues and compliance vulnerabilities of FY 2001more » Target Case and Below Target Case funding of EM cleanup activities; (4) S&H resource planning and crosscutting information for FY 1999 to 2001; and (5) Description of indirect-funded S&H activities.« less

  9. Batelle Energy Alliance, LLC (BEA) 2014 Annual report for Idaho National Laboratory (INL)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alvarez, Juan; Allen, Todd

    2014-10-01

    This Fiscal Year (FY) 2014 annual report provides the Department of Energy (DOE) with BEA’s self-assessment of performance managing and operating the INL for the period ending September 30, 2014. After considering all of the information related to INL performance during the rating period against the Goals, Objectives and Notable Outcomes in the FY 2014 Performance Evaluation and Measurement Plan (PEMP), BEA believes it earned an overall grade closest to an A. The paragraphs below highlight how INL excelled in delivering innovative and impactful research across the three mission areas; how INL has successfully positioned itself for future growth andmore » sustainment; and how, through strong leadership, INL has set and implemented a strategic direction to ensure we meet and exceed the expectations of DOE and other customers. Attachments 1 through 5 provide additional detail on FY 2014 mission accomplishments, outline corporate contributions for success, highlight national and international awards and recognitions at the organization and individual levels, and describe the performance issues and challenges faced in FY 2014. • Attachment 1, “Self-Assessed PEMP Ratings” • Attachment 2, “INL Mission Accomplishments” • Attachment 3, “Battelle Energy Alliance, LLC Contributions to INL Success” • Attachment 4, “FY 2014 Awards, Recognition, Professional Roles and Certifications” • Attachment 5, “Performance Issues and Challenges.”« less

  10. 29 CFR 1956.81 - Developmental schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... contested cases and employee access to information equivalent to 29 CFR parts 1903, 1905, 1911 and 2200... will be developed and submitted with the FY 2010 Grant Application. The performance plan will focus on.... (k) Illinois and OSHA will develop a plan for joining the OSHA Integrated Management Information...

  11. 78 FR 71704 - Request for Comments on Draft SBA Strategic Plan for FY 2014-2018

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-29

    ... AGENCY: Office of Associate Administrator for Performance Management & Chief Financial Officer, Small.... Carver, Associate Administrator for Performance Management & Chief Financial Officer. [FR Doc. 2013-28623...-7274. Mail: U.S. Small Business Administration, Office of Performance Management & Chief Financial...

  12. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1993.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1992-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Annual Implementation World Plan (AIWP) presents BPA`s plans for implementing the Program during fiscal year (FY) 1993. The FY 1993 AIWP emphasizes continuation of 143 ongoing or projecting ongoing Programmore » projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1993 AIWP also contains three new Program projects or tasks that are planned to start in FY 1993.« less

  13. 75 FR 44265 - Office of the Assistant Secretary for Planning and Evaluation; Request for Comments on the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-28

    ... planning process is an opportunity for the Department to further refine and strengthen the strategic goal... for Planning and Evaluation; Request for Comments on the Departmental FY 2010-2015 Strategic Plan... and Human Services Draft FY 2010-2015 Strategic Plan is provided as part of the strategic planning...

  14. Structures and Dynamics Division research and technology plans for FY 1894 and accomplishments for FY 1982

    NASA Technical Reports Server (NTRS)

    Bales, K. S.

    1984-01-01

    The Objectives, Expected Results, Approach, and Fiscal Year FY 1984 Milestones for the Structures and Dynamics Division's research programs are examined. The FY 1983 Accomplishments are presented where applicable.

  15. College of DuPage Information Technology Plan, Fiscal Year 1994-95.

    ERIC Educational Resources Information Center

    College of DuPage, Glen Ellyn, IL.

    Building upon four previous planning documents for computing at College of DuPage in Illinois, this plan for fiscal year 1995 (FY95) provides a starting point for future plans to address all activities that relate to the use of information technology on campus. The FY95 "Information Technology Plan" is divided into six sections, each…

  16. 75 FR 39493 - United States Patent and Trademark Office Draft Strategic Plan for FY 2010-2015

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-09

    ... plan includes the USPTO's mission statement, vision statement and a description of the strategic goals... achieve its vision. Full details on how the USPTO plans to implement the strategic plan, including funding...] United States Patent and Trademark Office Draft Strategic Plan for FY 2010-2015 AGENCY: United States...

  17. Information Resources Management Long Range Plan, FY 1995-1999

    NASA Technical Reports Server (NTRS)

    1994-01-01

    Table of Contents: Introduction; Agency 5-Year IRM Investment Projections; Major IRM Program Accomplishments for FY 1993; Information Collection Budget; Summary of Computer Security Plans; Appendix: Acronym List.

  18. NASA earth science and applications division: The program and plans for FY 1988-1989-1990

    NASA Technical Reports Server (NTRS)

    1988-01-01

    Described here are the Division's research goals, priorities and emphases for the next several years and an outline of longer term plans. Included are highlights of recent accomplishments, current activities in FY 1988, research emphases in FY 1989, and longer term future plans. Data and information systems, the Geodynamics Program, the Land Processes Program, the Oceanic Processes Program, the Atmospheric Dynamics and Radiation Program, the Atmospheric Chemistry Program, and space flight programs are among the topic covered.

  19. Navy-Marine Corps Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues for Congress

    DTIC Science & Technology

    2007-06-12

    up Northrop Grumman Ship Systems ( NGSS ). Table 2. FY2008-FY2013 Amphibious and MPF(F) Ship Procurement Plan (Ships fully funded in FY2006 shown for... Plan . . 13 Navy-Marine Corps Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues for Congress Introduction The...is whether to approve, modify, or reject the Navy’s plans for procuring amphibious and MPF(F) ships. Decisions that Congress makes on this CRS-2 1 The

  20. Navy DDG-1000 Destroyer Program: Background, Oversight Issues, and Options for Congress

    DTIC Science & Technology

    2007-10-25

    production quantity of eight ships (one more than the Navy currently plans to procure). Shared Production Arrangement. NGSS and GD/BIW have agreed on a...X)). Navy plans call for procuring 7 DDG-1000s between FY2007 and FY2013. The first two DDG-1000s were procured in FY2007 and are being split...Congress for the DDG-1000 program include supporting the Navy’s proposed plans , using a block-buy arrangement for procuring several DDG-1000s, and

  1. Ohio Board of Regents Guidelines for Preparing FY 2009-FY 2014 Capital Plans

    ERIC Educational Resources Information Center

    Ohio Board of Regents, 2007

    2007-01-01

    As with past practice, publishing this set of guidelines officially launches the higher education capital planning and budgeting process for fiscal years 2009-2014. The guidelines include a schedule, definitions, planning assumptions, statewide considerations, and instructions for presenting a six year capital plan. Contents include: (1)…

  2. Ohio Board of Regents Guidelines for Preparing FY 2007-FY 2012 Capital Plans

    ERIC Educational Resources Information Center

    Ohio Board of Regents, 2005

    2005-01-01

    As with past practice, publishing this set of guidelines officially launches the higher education capital planning and budgeting process for fiscal years 2007-2012. The guidelines include a schedule, definitions, planning assumptions, statewide considerations, and instructions for presenting a six-year capital plan. Contents include: (1)…

  3. Oak Ridge National Laboratory Institutional Plan, FY 1995--FY 2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-11-01

    This report discusses the institutional plan for Oak Ridge National Laboratory for the next five years (1995-2000). Included in this report are the: laboratory director`s statement; laboratory mission, vision, and core competencies; laboratory plan; major laboratory initiatives; scientific and technical programs; critical success factors; summaries of other plans; and resource projections.

  4. Network Speech Systems Technology Program

    NASA Astrophysics Data System (ADS)

    Weinstein, C. J.

    1980-09-01

    This report documents work performed during FY 1980 on the DCA-sponsored Network Speech Systems Technology Program. The areas of work reported are: (1) communication systems studies in Demand-Assignment Multiple Access (DAMA), voice/data integration, and adaptive routing, in support of the evolving Defense Communications System (DCS) and Defense Switched Network (DSN); (2) a satellite/terrestrial integration design study including the functional design of voice and data interfaces to interconnect terrestrial and satellite network subsystems; and (3) voice-conferencing efforts dealing with support of the Secure Voice and Graphics Conferencing (SVGC) Test and Evaluation Program. Progress in definition and planning of experiments for the Experimental Integrated Switched Network (EISN) is detailed separately in an FY 80 Experiment Plan Supplement.

  5. 76 FR 76769 - National Science Board; Sunshine Act Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-08

    .... FY 2012 Transfer Authority. Update on NSF FY 2013 Budget Development. Policies and planning for... STEM education plan. Discussion of the NSF STEM education research portfolio: getting from theory to...

  6. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1991.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1990-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operationmore » of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's draft plans for implementing the Program during Fiscal Year (FY) 1991. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Items 10.1-10.3. The AIWP includes schedules with key milestones for 1 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of September 1, 1990. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-17) lists FY 1991 new-start projects. ''Ongoing'' status indicates that the project started in FY 1990 or before and that it is expected to continue through part or all of FY 1991. ''Deferred'' means that BPA implementation has been postponed to FY 1992 or later. ''Completed'' indicates completion during FY 1990. ''New'' denotes projects planned for BPA implementation in FY 1991. However, several of these new projects were still under review by the Policy Review Group as the FY 1991 AIWP went to press. The new projects still under review have been noted in Table 2 and in the text of the AIWP. A number of projects are expected to begin in late FY 1990 and have been listed in Table 1 of the Draft AIWP as ''Projected FY '90 Starts,'' based on their projected start dates. Several other projects are expected to end in late FY 1990. These projects have been listed in Table 1 as ''Projected FY '90 Completions,'' based on their projected completion dates. Section VIII describes BPA's non-Program, internal support projects. These projects were not subject to review by the PRG and have been included in the AIWP to help the PRG and the public to better understand what BPA is doing.« less

  7. FY 1986 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  8. Foundation for the Future. 2013-2015 Strategic Plan. FY13 Organizational Performance Plan

    DTIC Science & Technology

    2013-01-01

    Strengths, Weaknesses, Opportunities, and Threats ( SWOT ) Analysis 192013–2015 Strategic Plan tr t ic l The Planning, Policy, and Leadership Support (PPLS...participation of faculty and staff from across the University in this review. The review process begins with an analysis of organizational strengths...weaknesses, opportunities, and threats ( SWOT ). (The results of the SWOT are shown on page 18.) This is based on an environmental scan which identifi

  9. Research and development strategic plan : FY2013-FY2017.

    DOT National Transportation Integrated Search

    2013-05-01

    This plan describes the strategy through which the Federal Railroad Administrations (FRAs) research and development (R&D) program will support the Department of Transportations (DOTs) mission and goals. Safety is the DOTs primary strat...

  10. Strategic Management Plan: The Business of Defense FY2014-2015

    DTIC Science & Technology

    2013-07-01

    customer wait time ( CWT ) by three percent (from 14.1 days in FY2011 to 13.7 days in FY2012). The Army’s improvement was associated with receiving...rate from 86.2 percent in FY2011 to 87.1 percent in FY2012. The improvement to CWT and perfect order fulfillment means that the Warfighter receives

  11. 2014 Strategic Sustainability Performance Plan

    DTIC Science & Technology

    2014-06-30

    Strategic Sourcing Initiatives, such as Blanket Purchase Agreements ( BPAs ) for office products and imaging equipment, which include sustainable...end of FY2014. Use Federal Strategic Sourcing Initiatives, such as Blanket Purchase Agreements ( BPAs ) Yes USACE is required to participate in

  12. 75 FR 341 - FY 2010-FY 2011 Broad Agency Announcement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ... Agency's strategic plan and mission goals, as well as to provide the general public with information and... and programs associated with the Agency's strategic plan and mission goals, as well as to provide the... systematic approach that links our strategic goals through multi-year plans to the daily activities of our...

  13. 75 FR 59204 - Fisheries of the Northeastern United States; Northeast (NE) Multispecies Fishery; Reopening of a...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    ... for addenda to the FY 2010 sector operations plans and contracts, and the supplemental environmental... sector operations plans and contracts and allocations of annual catch entitlement (ACE) for 17 NE... addenda to FY 2010 NE multispecies sector operations plans and contracts that would add certain exemptions...

  14. Hampton Roads, Virginia eight-hour ozone maintenance area transportation conformity analysis : 2030 long range transportation plan and FY 09-12 transportation improvement program, draft report.

    DOT National Transportation Integrated Search

    2010-05-01

    This report presents the regional conformity analysis and recommendation for a finding : of conformity for the Hampton Roads 2030 Long Range Transportation Plan (LRTP, or : "Plan") and associated Fiscal Year (FY) 2009-2012 Transportation Improvement ...

  15. Hampton Roads, Virginia eight-hour ozone maintenance area transportation conformity analysis : 2030 long range transportation plan and FY 09-12 transportation improvement program, draft executive summary.

    DOT National Transportation Integrated Search

    2010-05-01

    This report presents the regional conformity analysis and recommendation for a finding of conformity for the Hampton Roads 2030 Long Range Transportation Plan (LRTP, or "Plan") and associated Fiscal Year (FY) 2009-2012 Transportation Improvement Prog...

  16. LDRD FY 2014 Program Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anita Gianotto; Dena Tomchak

    As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.

  17. FY 1998 Proposed Rail Improvement Program Supplement

    DOT National Transportation Integrated Search

    1997-01-01

    This FY 1998 Proposed Rail Improvement Program Supplement contains those rail plan amendments which have been published subsequent to the FY 1997 Proposed Rail Improvement program supplement. This document also contains the benefit/cost methodology u...

  18. NASA Information Resources Management Long Range Plan, FY 1994-1998

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Table of Contents: Introduction; Agency 5-Year IRM Investment Projections; Program Specific IRM Activities by Program Office; Major IRM Program Accomplishments for FY 1992; Information Collection Budget; Summary of Computer Security Plans; and Appendix: Acronym List.

  19. Inpatient imaging utilization: trends of the past decade.

    PubMed

    Shinagare, Atul B; Ip, Ivan K; Abbett, Sarah K; Hanson, Richard; Seltzer, Steven E; Khorasani, Ramin

    2014-03-01

    We have previously reported inpatient imaging utilization trends at our institution from fiscal year (FY) 1984 through FY 2002. In this study, we assessed the trends in imaging utilization for inpatients from FY 2003 through FY 2012. In this institutional review board-approved retrospective study performed at a 793-bed tertiary care academic institution, we reviewed imaging utilization in adult inpatients from October 1, 2002, through September 30, 2012 (FY 2003 through FY 2012), and recorded the gross number of imaging studies coded by modality (conventional [radiography and fluoroscopy], ultrasound, nuclear medicine, CT, and MRI) and associated relative value units (RVUs). We used linear regression to assess trends in number of imaging studies and RVUs per case-mix-adjusted admission (CMAA). The total number of imaging studies, as well as the number of CT, nuclear medicine, and conventional studies adjusted for case mix, decreased (p=0.02, p=0.0006, p=0.0008, and p=0.001, respectively); CT per CMAA increased until FY 2009 and then decreased through FY 2012. Utilization of ultrasound and MRI did not change significantly (p=0.15 and p=0.22, respectively). Unadjusted global RVUs increased until FY 2009 and then showed a slight decrease through FY 2012 (p=0.04), whereas RVUs per CMAA did not change significantly (p=0.18). After decades of continued rise, imaging utilization for inpatients significantly decreased by most measures between FY 2009 and FY 2012. Future studies to evaluate the contribution of various factors to this decline, including efforts to reduce inappropriate use of imaging and concerns about potential harms of radiation exposure, may be helpful in optimizing imaging utilization and resource planning.

  20. NASCOM system development plan: System description, capabilities, and plans, FY 94-2

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The Nascom System Development Plan (NSDP) for FY 94-2 contains 17 sections. It is a management document containing the approved plan for maintaining the Nascom Network System. Topics covered include an overview of Nascom systems and services, major ground communication support systems, low-speed data system, voice system, high-speed data system, Nascom support for NASA networks, Nascom planning for NASA missions, and network upgrade and advanced systems developments and plans.

  1. Annual Plan for the EPA and CSB - FY 2018

    EPA Pesticide Factsheets

    Nov 9, 2017. FY 2018 plan reflects the priority work that the OIG believes is necessary to keep the EPA Administrator, the CSB, and Congress fully informed about problems and deficiencies relating to the administration of agency programs and operations.

  2. Loads and aeroelasticity division research and technology accomplishments for FY 1983 and plans for FY 1984

    NASA Technical Reports Server (NTRS)

    Gardner, J. E.; Dixon, S. C.

    1984-01-01

    Research was done in the following areas: development and validation of solution algorithms, modeling techniques, integrated finite elements for flow-thermal-structural analysis and design, optimization of aircraft and spacecraft for the best performance, reduction of loads and increase in the dynamic structural stability of flexible airframes by the use of active control, methods for predicting steady and unsteady aerodynamic loads and aeroelastic characteristics of flight vehicles with emphasis on the transonic range, and methods for predicting and reducing helicoper vibrations.

  3. Department of Defense Strategic Sustainability Performance Plan, FY 2011

    DTIC Science & Technology

    2011-01-01

    particularly in Asia— places pressure on projected oil production and refining capacity . Relating specifically to the fixed installations under the...ensure that sustainability factors are adequately addressed. Departmental planning and programming guidance lays out requirements that DoD Components... factors in addition to mission, financial, and regulatory considerations. For example, the mission benefits of having an off-grid source of electricity

  4. Notification: Assessment of the Qualifications of Environmental Protection Agency Personnel With Significant Security Responsibilities

    EPA Pesticide Factsheets

    Project #OMS-FY12-0006, February 15, 2012. The U.S. Environmental Protection Agency (EPA) Office of Inspector General plans to begin preliminary research for the subject project, which will be performed by a contractor.

  5. Annual Plan - Fiscal Year 2010 (revised)

    EPA Pesticide Factsheets

    This OIG Annual Plan identifies mandated and selected assignment topics continuing from Fiscal Year (FY) 2009 and scheduled to be started in the first half of FY 2010, providing for unforeseen work in the latter part of the year that may be directed by a n

  6. Cloud computing strategic framework (FY13 - FY15).

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arellano, Lawrence R.; Arroyo, Steven C.; Giese, Gerald J.

    This document presents an architectural framework (plan) and roadmap for the implementation of a robust Cloud Computing capability at Sandia National Laboratories. It is intended to be a living document and serve as the basis for detailed implementation plans, project proposals and strategic investment requests.

  7. FY16-20 Strategic Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harwell, Amber Suzanne

    2015-07-01

    Welcome to our FY16–FY20 Strategic Plan, which both refects our continued dedication to the work we do and reinforces the importance of the integrated Laboratories’ strategic framework to our future. This document is the result of the leadership team’s journey over the past few years in response to the needs of our nation. In an external environment that continues to change, sometimes in unexpected ways, it is critical that our mission areas and our foundation become increasingly synergistic, forming a whole whose parts are interdependent.

  8. Investing in the Future: Strategic Planning, FY 2001 Appropriations Requests, Supplemental & Statistical Information.

    ERIC Educational Resources Information Center

    Iowa State Board of Regents, Des Moines.

    This document presents the State of Iowa Board of Regents fiscal year (FY) 2001 budget requests and provides information about the Board and its institutions. An introductory section 1 offers an overview of the Board of Regents' functions, including a mission state and governance process, and explains FY 2000 appropriation reductions and FY 2001…

  9. 78 FR 65978 - Draft Revised Strategic Plan for FY 2014-2018

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-04

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD Draft Revised Strategic Plan for FY 2014-2018 AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Notice. SUMMARY: In accordance with Office of Management and Budget Circular No. A-11, the Defense Nuclear Facilities Safety Board (DNFSB) is soliciting...

  10. 75 FR 4794 - Draft Revised Strategic Plan for FY 2010-2015

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-29

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD Draft Revised Strategic Plan for FY 2010-2015 AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Notice. SUMMARY: In accordance with OMB Circular No. A-11, the Defense Nuclear Facilities Safety Board is soliciting comments from all interested and potentially...

  11. Annual Report 1984.

    DTIC Science & Technology

    1985-01-01

    equipped with data collection platforms (DCP) by the end of FY 1985. (b) Communication. The DCP’s transmit the remote gaging station data over the...activated 78 platforms in FY 84 bringing the total number of operating stations to 85. Plans are to activate seven more platforms in FY 85. c. Acoustic... Platforms . The total program cost for FY 1984 is shown in Table VI-3. The total program cost for FY 1985 will be $172,720. (2) National Weather Service

  12. Loads and aeroelasticity division research and technology accomplishments for FY 1982 and plans for FY 1983

    NASA Technical Reports Server (NTRS)

    Gardner, J. E.

    1983-01-01

    Accomplishments of the past year and plans for the coming year are highlighted as they relate to five year plans and the objectives of the following technical areas: aerothermal loads; multidisciplinary analysis and optimization; unsteady aerodynamics; and configuration aeroelasticity. Areas of interest include thermal protection system concepts, active control, nonlinear aeroelastic analysis, aircraft aeroelasticity, and rotorcraft aeroelasticity and vibrations.

  13. Summary document of tasks performed on the Shuttle-C/NLS contract

    NASA Technical Reports Server (NTRS)

    1993-01-01

    During FY92, USBI performed many programmatic related tasks. These programmatic tasks have been categorized as follows: (1) acquisition; (2) project engineering/program planning; and (3) cost. The reports associated with these tasks follow in paragraphs 1.1.1 through 1.3.3. Proceeding each task report is a brief description of the contents contained within.

  14. 2010 Annual Summary Report for the Area 3 and Area 5 Radioactive Management Sites at the Nevada National Security Site, Nye County, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Management

    2011-03-01

    The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office performed an annual review of the Area 3 and Area 5 Radioactive Waste Management Site (RWMS) Performance Assessments (PAs) and Composite Analyses (CAs) in fiscal year (FY) 2010. This annual summary report presents data and conclusions from the FY 2010 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at themore » Nevada National Security Site (NNSS) (formerly the Nevada Test Site) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs.« less

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Downar, Thomas

    This report summarizes the current status of VERA-CS Verification and Validation for PWR Core Follow operation and proposes a multi-phase plan for continuing VERA-CS V&V in FY17 and FY18. The proposed plan recognizes the hierarchical nature of a multi-physics code system such as VERA-CS and the importance of first achieving an acceptable level of V&V on each of the single physics codes before focusing on the V&V of the coupled physics solution. The report summarizes the V&V of each of the single physics codes systems currently used for core follow analysis (ie MPACT, CTF, Multigroup Cross Section Generation, and BISONmore » / Fuel Temperature Tables) and proposes specific actions to achieve a uniformly acceptable level of V&V in FY17. The report also recognizes the ongoing development of other codes important for PWR Core Follow (e.g. TIAMAT, MAMBA3D) and proposes Phase II (FY18) VERA-CS V&V activities in which those codes will also reach an acceptable level of V&V. The report then summarizes the current status of VERA-CS multi-physics V&V for PWR Core Follow and the ongoing PWR Core Follow V&V activities for FY17. An automated procedure and output data format is proposed for standardizing the output for core follow calculations and automatically generating tables and figures for the VERA-CS Latex file. A set of acceptance metrics is also proposed for the evaluation and assessment of core follow results that would be used within the script to automatically flag any results which require further analysis or more detailed explanation prior to being added to the VERA-CS validation base. After the Automation Scripts have been completed and tested using BEAVRS, the VERA-CS plan proposes the Watts Bar cycle depletion cases should be performed with the new cross section library and be included in the first draft of the new VERA-CS manual for release at the end of PoR15. Also, within the constraints imposed by the proprietary nature of plant data, as many as possible of the FY17 AMA Plant Core Follow cases should also be included in the VERA-CS manual at the end of PoR15. After completion of the ongoing development of TIAMAT for fully coupled, full core calculations with VERA-CS / BISON 1.5D, and after the completion of the refactoring of MAMBA3D for CIPS analysis in FY17, selected cases from the VERA-CS validation based should be performed, beginning with the legacy cases of Watts Bar and BEAVRS in PoR16. Finally, as potential Phase III future work some additional considerations are identified for extending the VERA-CS V&V to other reactor types such as the BWR.« less

  16. Fiscal Year (FY) 2001 Budget Estimates. Army National Guard. Military Construction Program FY 2001. Justification Data Submission to Congress. Department of the Army.

    DTIC Science & Technology

    2000-02-01

    CONSIDERATIONS ix-xx FUTURE YEARS DEFENSE PLAN AUDIT TRAIL xxi-xxiii PROJECT JUSTIFICATION DOCUMENTS 1-149 PLANNING & DESIGN JUSTIFICATION DOCUMENT 15 0...OUTSTANDING POLUTION AND SAFETY DEFICIENCIES: DDl°™1390s2 MAY 78 1. COMPONENT FY 2001 GUARD AND RESERVE 2. DATE ARNG MILITARY CONSTRUCTION FEB00 3...TOTAL 36 286 13 MAJOR EQUIPMENT AND AIRCRAFT TYPE AUTHORIZED ASSIGNED 14. OUTSTANDING POLUTION AND SAFETY DEFICIENCIES: DD:A O™1390S2 1

  17. Exploratory Research on Personnel Long Range Planning

    DTIC Science & Technology

    1982-05-01

    rN4 and Joyce ShieldsI AR I ’I.0 04E~i Reserch nsttuteforU. S., Army K-Z Reearh Istiuteforthe Behavioral and Social Sciences May 1982 4S () 9 2~s.? 001...should be included in a personnel long ,ang plan (PLRP), DD , 0711W03 mno EOF@ 9 Nov sois@oneum UNCLASSIFIED SECURITY CLASSIFICATION OF TNIS PAE9 (ftaft...Accessions 3-16 3-7 FY1998 Distribution of Non-Prior-Service Accessions 3-17 3-8 FY1988 Distribution of Non-Prior-Service Accessions 3-18 * 3- 9 FY1989

  18. Notification: Background Investigation Services Audits of EPA’s Fiscal Year 2015 FIFRA and PRIA Financial Statements

    EPA Pesticide Factsheets

    Projects #OA-FY16-0080 and #OA-FY16-0079, February 8, 2016. EPA OIG plan to begin audits of the EPA's fiscal year (FY) 2015 financial statements for the Pesticides Reregistration and Expedited Processing Fund (FIFRA) and Pesticide Registration Fund (PRIA).

  19. Notification: Background Investigation Services Project Notification US Virgin Islands Environmental Program Evaluation

    EPA Pesticide Factsheets

    Projects #OPE-FY14-0004, OPE-FY14-0005 and OPE-FY14-0006, October 30, 2013. The EPA OIG plans to begin preliminary research on October 30, 2013 into the environmental programs the US Virgin Islands (USVI) has implemented on EPA’s behalf.

  20. Development Achievements for Fiscal 1990.

    ERIC Educational Resources Information Center

    Smoot, Joseph G.

    This document presents the Fiscal Year (FY) 1990 report of Kansas' Pittsburg State University's (PSU) development program. The report addresses the annual fund, the campaign for distinction, the PSU foundation, and development plans for FY 1991. It includes an overview of FY 1990 activities and an executive summary. Among the findings presented…

  1. Air Quality Conformity Determination Of the Constrained Long Range Plan And The FY99-2004 Transportation Improvement Program For The Washington Metropolitan Region

    DOT National Transportation Integrated Search

    1998-07-15

    This report documents the assessment of the Constrained Long Range Plan (CLRP) and the FY99-2004 Transportation Improvement Program (TIP) with respect to air quality conformity requirements under the 1990 Clean Air Act Amendments. The assessment used...

  2. Land Information System (LIS) Development Plan: FY13-FY17

    DTIC Science & Technology

    2013-10-01

    NE 68113 ERDC/CRREL TN-13-2 ii Abstract In 2007, the Air Force Weather Agency (AFWA) approved a plan, collabo- rative with NASA Goddard Space...18 4.1.2 AFWA sponsored research and development at NASA ........................................... 21 4.1.3...26 4.2.2 AFWA funded R&D at NASA

  3. DCSC (Defense Construction Supply Center) Total Quality Management Master Plan

    DTIC Science & Technology

    1989-07-01

    job while allowing them to establish a better balance between work and personal needs. 29 TQM SHORT-MID-LONG RANGE INITIATIVES MID RANGE (3 YEARS...all performance standards. IMPROVE THE QUALITY OF WORKLIFE - Projects requiring engineering support throughout FY 90 and beyond are: Construction of

  4. Notification: EPA’s Use of Science and Research Federal Advisory Committees to Improve Agency Performance

    EPA Pesticide Factsheets

    Project #OPE-FY16-0024, May 9, 2016.The EPA OIG plans to begin preliminary research on internal controls the EPA has in place to engage science and research Federal Advisory Committee Act (FACA) committees and utilize their recommendations.

  5. 78 FR 56271 - FY 2014-2020 Draft VA Strategic Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-12

    ... and access to benefits and services through integration within VA and with our partners; and... integration within VA and with our partners; and developing our workforce with the skills, tools, and... program to coordination and integration across programs and organizations, measuring performance by the...

  6. Transition projects, Fiscal Year 1996: Multi-Year Program Plan (MYPP) for WBS 1.31, 7.1, and 6.13. Revision 1, Volume 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cartmell, D.B.

    1995-09-01

    Based on US Department of Energy (DOE), Richland Operations Office (RL) review, specific areas of Westinghouse Hanford Company (WHC), Transition Projects ``Draft`` Multi-Year Program Plan (MYPP) were revised in preparation for the RL approval ceremony on September 26, 1995. These changes were reviewed with the appropriate RL Project Manager. The changes have been incorporated to the MYPP electronic file, and hard copies replacing the ``Draft`` MYPP will be distributed after the formal signing. In addition to the comments received, a summary level schedule and outyear estimates for the K Basin deactivation beginning in FY 2001 have been included. The Kmore » Basin outyear waste data is nearing completion this week and will be incorporated. This exclusion was discussed with Mr. N.D. Moorer, RL, Facility Transition Program Support/Integration. The attached MYPP scope/schedule reflects the Integrated Target Case submitted in the April 1995 Activity Data Sheets (ADS) with the exception of B Plant and the Plutonium Finishing Plant (PFP). The 8 Plant assumption in FY 1997 reflects the planning case in the FY 1997 ADS with a shortfall of $5 million. PFP assumptions have been revised from the FY 1997 ADS based on the direction provided this past summer by DOE-Headquarters. This includes the acceleration of the polycube stabilization back to its originally planned completion date. Although the overall program repricing in FY 1996 allowed the scheduled acceleration to fall with the funding allocation, the FY 1997 total reflects a shortfall of $6 million.« less

  7. Satellite Power System (SPS) FY 79 program summary

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The Satellite Power System (SPS) program a joint effort to develop an initial understanding of the technical feasibility, the economic practicality, and the social and environmental acceptability of the SPS concept is discussed. This is being accomplished through implementation of the Concept Development and Evaluation Program Plan which is scheduled for completion by the end of FY 1980. This Program Summary not only covers FY 1979 but includes work completed in FY 1977 and FY 1978 in order to give a comprehensive picture of the DOE involvement in the SPS concept development and evaluation process.

  8. Loads and Aeroelasticity Division research and technology accomplishments for FY 1984 and plans for FY 1985

    NASA Technical Reports Server (NTRS)

    Gardner, J. E.; Dixon, S. C.

    1985-01-01

    The loads and aeroelasticity divisions research accomplishments are presented. The work under each branch or technical area, described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5 year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  9. 78 FR 21959 - Extension of Public Comment Period for Request for Information on the FY 2013-2018 Strategic Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... Period for Request for Information on the FY 2013-2018 Strategic Plan for the Office of Disease Prevention SUMMARY: The Office of Disease Prevention (ODP), National Institutes of Health (NIH), is amending..., Office of Disease Prevention, National Institutes of Health; phone, 301-496-1508; email, [email protected

  10. Department of Defense Chemical, Biological, Radiological, and Nuclear Defense Program. FY2003-2005 Performance Plan

    DTIC Science & Technology

    2004-05-01

    Agents (NTAs) Compare the direct effects of PAF on smooth muscle, hematic constituents, and lung to determine role in toxicity. Continue to...baselined. Long Range Biometric Target ID System Explore technologies for a long range biometric target identification system. 3.5.1.6

  11. Utilizing an Intelligent Tutoring System in Tactical Action Officer Sandbox

    DTIC Science & Technology

    2014-06-01

    Office of Naval Research Future Naval Capabilities, the Defense Technology Area Plan from 2005 and the Department of Defense Science and Technology ...LEFT BLANK v ABSTRACT The Office of Naval Research Future Naval Capabilities, the Defense Technology Area Plan from 2005 and the Department...of Defense Science and Technology Priorities for FY13-17 all share a focus on systems to promote warfighter performance. The goal of these systems is

  12. Supporting Data Amended FY 1992/FY 1993 Biennial Budget Estimate Submitted to Congress - January 1992. Descriptive Summaries of the Research, Development, Test and Evaluation, Army Appropriation

    DTIC Science & Technology

    1992-01-01

    dessert and snack items to increase acceptability and 31$,) UNCLASSIFIED UNCLASSIFIED AMENDED FY 1992/1993 BIENNIAL RDTE DESCRIPTIVE SUMMARY Program...Planned Program: " (U) Finalize development of non-organic and non-polluting processing bids for extruded and molded energetic materials * (U

  13. LBNL Laboratory Directed Research and Development Program FY2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ho, D.

    2017-03-01

    The Berkeley Lab Laboratory Directed Research and Development Program FY2016 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the supported projects and summarizes their accomplishments. It constitutes a part of the LDRD program planning and documentation process that includes an annual planning cycle, project selection, implementation and review.

  14. FY16 Strategic Themes White Paper.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leland, Robert W.

    The Science and Technology (S&T) Division 1000 Strategic Plan includes the Themes, Goals, and Actions for FY16. S&T will continue to support the Labs Strategic plan, Mission Areas and Program Management Units by focusing on four strategic themes that align with the targeted needs of the Labs. The themes presented in this plan are Mission Engagement, Bold Outcomes, Collaborative Environment, and the Safety Imperative. Collectively they emphasize diverse, collaborative teams and a self-reliant culture of safety that will deliver on our promise of exceptional service in the national interest like never before. Mission Engagement focuses on increasing collaboration at allmore » levels but with emphasis at the strategic level with mission efforts across the labs. Bold Outcomes seeks to increase the ability to take thoughtful risks with the goal of achieving transformative breakthroughs more frequently. Collaborative environment strives for a self-aware, collaborative working environment that bridges the many cultures of Sandia. Finally, Safety Imperative aims to minimize the risk of serious injury and to continuously strengthen the safety culture. Each of these themes is accompanied by a brief vision statement, several goals, and planned actions to support those goals throughout FY16 and leading into FY17.« less

  15. Integrated modeling of advanced optical systems

    NASA Astrophysics Data System (ADS)

    Briggs, Hugh C.; Needels, Laura; Levine, B. Martin

    1993-02-01

    This poster session paper describes an integrated modeling and analysis capability being developed at JPL under funding provided by the JPL Director's Discretionary Fund and the JPL Control/Structure Interaction Program (CSI). The posters briefly summarize the program capabilities and illustrate them with an example problem. The computer programs developed under this effort will provide an unprecedented capability for integrated modeling and design of high performance optical spacecraft. The engineering disciplines supported include structural dynamics, controls, optics and thermodynamics. Such tools are needed in order to evaluate the end-to-end system performance of spacecraft such as OSI, POINTS, and SMMM. This paper illustrates the proof-of-concept tools that have been developed to establish the technology requirements and demonstrate the new features of integrated modeling and design. The current program also includes implementation of a prototype tool based upon the CAESY environment being developed under the NASA Guidance and Control Research and Technology Computational Controls Program. This prototype will be available late in FY-92. The development plan proposes a major software production effort to fabricate, deliver, support and maintain a national-class tool from FY-93 through FY-95.

  16. Navy Nuclear-Powered Surface Ships: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2008-10-03

    the use of nuclear power to a wider array of Navy surface ships, including the Navy’s planned CG(X) cruiser. Section 1012 of the FY2008 Defense...wider array of Navy surface ships, starting with the Navy’s planned CG(X) cruiser. Section 1012 of the FY2008 Defense Authorization Act (H.R. 4986...CG(X) Cruiser Program: Background, Oversight Issues, and Options for Congress, by Ronald O’Rourke. 8 For more on the Navy’s 313-ship plan , see CRS

  17. NASA agenda for tomorrow

    NASA Technical Reports Server (NTRS)

    1988-01-01

    Key elements of national policy, NASA goals and objectives, and other materials that comprise the framework for NASA planning are included. The contents are expressed as they existed through much of 1988; thus they describe the strategic context employed by NASA in planning both the FY 1989 program just underway and the proposed FY 1990 program. NASA planning will continue to evolve in response to national policy requirements, a changing environment, and new opportunities. Agenda for Tomorrow provides a status report as of the time of its publication.

  18. Structural dynamics division research and technology accomplishments for F.Y. 1991 and plans for F.Y. 1992

    NASA Technical Reports Server (NTRS)

    Wynne, Eleanor C.

    1992-01-01

    The work under each technical area is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5 year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest. The structural dynamics division consist of the following branches: configuration aeroelasticity; unsteady aerodynamics; aeroservoelasticity; landing and impact dynamics; and spacecraft dynamics.

  19. Laboratory Directed Research and Development Program FY2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none, none

    2012-04-27

    Berkeley Lab's research and the Laboratory Directed Research and Development (LDRD) program support DOE's Strategic Themes that are codified in DOE's 2006 Strategic Plan (DOE/CF-0010), with a primary focus on Scientific Discovery and Innovation. For that strategic theme, the Fiscal Year (FY) 2011 LDRD projects support each one of the three goals through multiple strategies described in the plan. In addition, LDRD efforts support the four goals of Energy Security, the two goals of Environmental Responsibility, and Nuclear Security (unclassified fundamental research that supports stockpile safety and nonproliferation programs). Going forward in FY 2012, the LDRD program also supports themore » Goals codified in the new DOE Strategic Plan of May, 2011. The LDRD program also supports Office of Science strategic plans, including the 20-year Scientific Facilities Plan and the Office of Science Strategic Plan. The research also supports the strategic directions periodically under consideration and review by the Office of Science Program Offices, such as LDRD projects germane to new research facility concepts and new fundamental science directions. Brief summares of projects and accomplishments for the period for each division are included.« less

  20. 76 FR 9052 - Comment Request for Information Collection for the Unemployment Insurance (UI) Facilitation of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-16

    ... effectiveness and public accountability by focusing on program results, service quality, and customer satisfaction. Outcome Goal 1.3 in the Department's fiscal year (FY) 2011--2016 Strategic Plan--Help workers who... Measures The UI reemployment GPRA and UI Performs measures are defined as the percentage of all UI...

  1. National Drug Control Strategy. FY 2009 Budget Summary

    ERIC Educational Resources Information Center

    The White House, 2008

    2008-01-01

    The National Drug Control Budget Summary identifies resources and performance indicators for programs within the Executive Branch that are integral to the President's National Drug Control Strategy. The Strategy, which is the Administration's plan for reducing drug use and availability, is based on three pillars: (1) Stopping Use Before It Starts,…

  2. A novel FY*A allele with the 265T and 298A SNPs formerly associated exclusively with the FY*B allele and weak Fy(b) antigen expression: implication for genotyping interpretative algorithms.

    PubMed

    Lopez, G H; Condon, J A; Wilson, B; Martin, J R; Liew, Y-W; Flower, R L; Hyland, C A

    2015-01-01

    An Australian Caucasian blood donor consistently presented a serology profile for the Duffy blood group as Fy(a+b+) with Fy(a) antigen expression weaker than other examples of Fy(a+b+) red cells. Molecular typing studies were performed to investigate the reason for the observed serology profile. Blood group genotyping was performed using a commercial SNP microarray platform. Sanger sequencing was performed using primer sets to amplify across exons 1 and 2 of the FY gene and using allele-specific primers. The propositus was genotyped as FY*A/B, FY*X heterozygote that predicted the Fy(a+b+(w) ) phenotype. Sequencing identified the 265T and 298A variants on the FY*A allele. This link between FY*A allele and 265T was confirmed by allele-specific PCR. The reduced Fy(a) antigen reactivity is attributed to a FY*A allele-carrying 265T and 298A variants previously defined in combination only with the FY*B allele and associated with weak Fy(b) antigen expression. This novel allele should be considered in genotyping interpretative algorithms for generating a predicted phenotype. © 2014 International Society of Blood Transfusion.

  3. FRX-L Research Status and Plans

    NASA Astrophysics Data System (ADS)

    Wurden, G. A.; Intrator, T. P.; Taccetti, J. M.; Furno, I. G.; Hsu, S. C.; Zhang, S. Y.; Degnan, J. H.; Grabowski, C.; Ruden, E. L.

    2003-10-01

    Our research plans for FRX-L, the field reversed configuration plasma injector at LANL for magnetized target fusion (MTF), have been planned for the next 4-year period. FRX-L has been successfully operating now for the last two years, although construction for both the machine and diagnostic sets is ongoing. Efforts in FY04 begin with continued improvements in the basic high density FRC parameters, through operation at increased magnetic fields and with the addition of a more effective main bank crowbar to reduce parasitic ringing in the high current main coil circuit. Translation experiments into a "fake" metal liner, perforated with diagnostic access ports, will start after designing and constructing the translation section. Another bank of capacitors will be added to power the additional guide and mirror coils. After demonstrating trapping of the plasma in the aluminum liner, and diagnosing sufficient plasma parameters (density, temperature, lifetime, purity), we will begin preparations for the integrated plasma/liner compression experiment at the Air Force Research Laboratory Shiva-Star machine in FY05. Construction of the new hardware will continue during FY06, and the first fusion-relevant demonstration of compression of plasma by an imploding metal liner is planned for FY07. Our MTF plans also include new initiatives with U of Washington, U of Wisconsin, and the University of New Mexico, in addition to ongoing theory ties to LLNL and GA.

  4. Annual Performance Report - FY 2011

    EPA Pesticide Factsheets

    This report summarizes OIG activity, performance, results, and challenges, and provides a financial accounting of resources for fiscal year (FY) 2011 compared to our FY 2011 annual performance targets.

  5. Defense Commissary Resale Stock Fund Financial Statements For FY 1992

    DTIC Science & Technology

    1993-06-30

    present DeCA’s accounting procedures during FY 1992. We understand DeCA is aggressively working to improve its financial management system. However...the year ended September 30, 1992, we considered the related internal control structure. The purpose of the planning work was to determine the...auditing procedures we would apply for the purposes of expressing our opinion on the Financial Statements. Planning work included obtaining an

  6. Ground Node

    DTIC Science & Technology

    2009-09-30

    Node deployment. Original plans were to deploy directly to Fort Jefferson on Dry Tortugas (near Key West, FL). Current plans are to initially deploy...to the USCG Station on Ismoralda Key for training operations; then deploy at a to-be- determined date to Fort Jefferson on Dry Tortugas . During FY09...Dry Tortugas . NRL expects to deliver the Ground Node to Ismoralda Key in October 2009. FY09 continued the third year of providing Ground

  7. 75 FR 82377 - NOAA's Office of Ocean Exploration and Research (OER) Strategic Plan FY 2011-FY 2015

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-30

    .... Data and observations resulting from OER investments will result in new discoveries, insights, knowledge and identification of new frontiers, and will likely lead to new or revised understandings of our...

  8. 78 FR 23735 - Analysis of Service Contract Inventory for FY 2011 and the Planned Analysis of the FY 2012...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-22

    ...;and investigations, committee meetings, agency decisions and rulings, #0;delegations of authority... Interest Functions Product Service Codes (PSCs) studied by the Agency; (2) The methodology used by the...

  9. Defense: FY2011 Authorization and Appropriations

    DTIC Science & Technology

    2010-11-23

    the Czech Republic a modified version of the land-based BMD system currently deployed in Alaska and California. The Obama Administration dropped that...Implications for National Security Planning, by Stephen Daggett. The four QDRs produced in 1997, 2001, 2005, and 2010 document an ongoing evolution of DOD...expensive part of measures to protect forward deployed forces. FY2011 Base Budget Highlights and Potential Issues The FY2011 base budget request

  10. Manpower Requirements Report for Fiscal Year 1976

    DTIC Science & Technology

    1975-02-01

    with land, sea, air, and undersea operations. In addition, the Navy is FY 74 FY 75 FY 76 FY 7T sai Civ m Civ F^^, Civ sr Civ H eadquartert; .. 0.4...eventuaJly r esult i r. a lcwer annual access~or. requirerr.ent . Tte FY 1976 plan pr ojects an av~rage l ength of ::i P.itiel enlis tment o f J . 5 yea r...4.« Pe^*»rch *nd ■PTT Cui :Tv >r.»r»l h^nt’«- F^reei: I.»r.ii F-r-^c ~ tte ». 1^»I Air Fcr?«;f ’.•iv«il fcrces Uct!l!»i Fcrcet Ut.C

  11. DOE-NE Proliferation and Terrorism Risk Assessment: FY12 Plans Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sadasivan, Pratap

    2012-06-21

    This presentation provides background information on FY12 plans for the DOE Office of Nuclear Energy Proliferation and Terrorism Risk Assessment program. Program plans, organization, and individual project elements are described. Research objectives are: (1) Develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of current reactors; (2) Develop improvements in the affordability of new reactors to enable nuclear energy; (3) Develop Sustainable Nuclear Fuel Cycles; and (4) Understand and minimize the risks of nuclear proliferation and terrorism - Goal is to enable the use of risk information to inform NE R&D programmore » planning.« less

  12. Nuclear rocket propulsion. NASA plans and progress, FY 1991

    NASA Technical Reports Server (NTRS)

    Clark, John S.; Miller, Thomas J.

    1991-01-01

    NASA has initiated planning for a technology development project for nuclear rocket propulsion systems for space explorer initiative (SEI) human and robotic missions to the moon and Mars. An interagency project is underway that includes the Department of Energy National Laboratories for nuclear technology development. The activities of the project planning team in FY 1990 and 1991 are summarized. The progress to date is discussed, and the project plan is reviewed. Critical technology issues were identified and include: (1) nuclear fuel temperature, life, and reliability; (2) nuclear system ground test; (3) safety; (4) autonomous system operation and health monitoring; and (5) minimum mass and high specific impulse.

  13. Nuclear rocket propulsion: NASA plans and progress - FY 1991

    NASA Technical Reports Server (NTRS)

    Clark, John S.; Miller, Thomas J.

    1991-01-01

    NASA has initiated planning for a technology development project for nuclear rocket propulsion systems for space exploration initiative (SEI) human and robotic missions to the Moon and to Mars. An interagency project is underway that includes the Department of Energy National Laboratories for nuclear technology development. The activities of the project planning team in FY 1990 and 1991 are summarized. The progress to date is discussed, and the project plan is reviewed. Critical technology issues were identified and include: (1) nuclear fuel temperature, life, and reliability; (2) nuclear system ground test; (3) safety; (4) autonomous system operation and health monitoring; and (5) minimum mass and high specific impulse.

  14. Government-Imposed Barriers to the Use of Commercial Integrated Circuits in Military Systems.

    DTIC Science & Technology

    1996-02-01

    Advanced Planning Briefing for Industry (undated). The FY94/FY95 research agenda of the Microprocessor Technology Utiliza- tion Program includes... planning and re- sults. As a model of how a private institute might operate, we suggest (without implying partiality) the Semiconductor Research...or incorporate lessons learned). Those IC suppliers passing the audit are listed on the QML. Products from QML-listed suppliers can be used with

  15. Shallow Water Acoustic Experiments and Preliminary Planning for FY06 Fieldwork

    DTIC Science & Technology

    2011-03-21

    To) 5/1/2005-12/31/2010 4. TITLE AND SUBTITLE Shallow Water Acoustic Experiments and Preliminary Planning for FY06 Fieldwork 5a. CONTRACT NUMBERS...numerical computations show horizontal interference patterns within the duct. Richly de - tailed sound radiation fields are predicted at locations far...4) for the vertical modal amplitude Tm at x^L is now de - scribed in detail. First, the assumption of total transmission at the open-ended

  16. 76 FR 1471 - FY 2010 Annual Compliance Report; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-10

    ... issued rules on periodic reporting of service performance measurement and customer satisfaction in FY...-FY10- 29. Id. at 12. Customer satisfaction. The FY 2010 ACR discusses the Postal Service's transition... filing; service performance results; levels of customer satisfaction achieved; progress toward goals...

  17. Monitoring of the Quality of the Defense Contract Audit Agency FY 2010 Audits

    DTIC Science & Technology

    2013-03-07

    performed by regional audit managers include reviewing high risk assignments and reports prior to their issuance, performing post-issuance reviews, or...brainstorming procedure requires the audit team ( managers , supervisors, and auditors) to discuss the risk of fraud for that engagement and to discuss the risk ...auditors to make inquiries of contractor management of management’s knowledge of fraud risks during its annual planning meeting with major contractors

  18. Fiscal Year 2011 Comprehensive Oversight Plan for Southwest Asia and Surrounding Areas

    DTIC Science & Technology

    2011-03-31

    NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND...ADDRESS(ES) Department of Defense Inspector General,400 Army Navy Drive,Arlington,VA,22202-4704 8. PERFORMING ORGANIZATION REPORT NUMBER 9...Southwest Asia in Appendix B. The FY 2011 edition is organized by primary oversight countries: Afghanistan, Iraq, Pakistan, Kuwait, Qatar, and all

  19. National Aeronautics and Space Administration FY 02 Revised Final Annual Performance Plan

    NASA Technical Reports Server (NTRS)

    2002-01-01

    The Government Performance and Results Act (GPRA) was passed by Congress and signed by the President in 1993. GPRA was enacted to improve the efficiency of all Federal agencies, with the following specific goals: (1) Improve Federal program management, effectiveness, and public accountability; (2) Improve Congressional decision making on where to commit the Nation's financial and human resources; and (3) Improve citizen confidence in government performance. GPRA directs Executive Branch agencies to develop a customer-focused strategic plan that aligns activities with concrete missions and goals. The Act directs agencies to manage and measure results to justify Congressional appropriations and authorizations. The Report Consolidation Act of 2000 directs agencies to provide a report on the degree of success in achieving the goals and performance measures defined in the strategic and performance plans one hundred and fifty days after the completion of the fiscal year.

  20. FY 2017 Stockpile Stewardship and Management Plan - Biennial Plan Summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2016-03-01

    This year’s summary report updates the Fiscal Year 2016 Stockpile Stewardship and Management Plan (FY 2016 SSMP), the 25-year strategic program of record that captures the plans developed across numerous NNSA programs and organizations to maintain and modernize the scientific tools, capabilities, and infrastructure necessary to ensure the success of NNSA’s nuclear weapons mission. The SSMP is a companion to the Prevent, Counter, and Respond: A Strategic Plan to Reduce Global Nuclear Threats (FY 2017-2021) report, the planning document for NNSA’s nuclear threat reduction mission. New versions of both reports are published each year in response to new requirements andmore » challenges. Much was accomplished in FY 2015 as part of the program of record described in this year’s SSMP. The science-based Stockpile Stewardship Program allowed the Secretaries of Energy and Defense to certify for the twentieth time that the stockpile remains safe, secure, and effective without the need for underground nuclear explosive testing. The talented scientists, engineers, and technicians at the three national security laboratories, the four nuclear weapons production plants, and the national security site are primarily responsible for this continued success. Research, development, test, and evaluation programs have advanced NNSA’s understanding of weapons physics, component aging, and material properties through first-of-a-kind shock physics experiments, along with numerous other critical experiments conducted throughout the nuclear security enterprise. The multiple life extension programs (LEPs) that are under way made progress toward their first production unit dates. The W76-1 LEP is past the halfway point in total production, and the B61-12 completed three development flight tests. Critical to this success is the budget. The Administration’s budget request for NNSA’s Weapons Activities has increased for all but one of the past seven years, resulting in a total increase of approximately 45 percent since 2010. If adopted by Congress, the FY 2017 budget request will increase funding by $396 million (about 4.5 percent) from the enacted FY 2016 level. A significant portion of the increase would fund the research for multiple life extension programs, support the programs in Directed Stockpile Work, and modernize the physical infrastructure of the nuclear security enterprise.« less

  1. State, Foreign Operations, and Related Programs: FY2008 Appropriations

    DTIC Science & Technology

    2007-12-14

    and social reforms. The President initially pledged $5 billion annually by FY2006, although funds requested and appropriated have never reached this...to Cuba. The BBG is planning to eliminate several VOA services including Uzbek, Greek, and Cantonese as well as the RFE/RL Macedonia service. BBG also...increased to $230.0 million. The increase of $195 million is entirely for social services to Iraqi refugees. FY2007 Supplemental Request. On April 25

  2. VA/DoD Joint Executive Council FY 2009: Joint Strategic Plan FY 2010-2012

    DTIC Science & Technology

    2009-01-01

    through the Military Health System (MHS) Population Health Portal . HEC Traumatic Brain Injury and Psychological Health In FY 2009, VA and DoD made...available using the Deployment Occupational and Environmental Health Surveillance Portal . TBI and MH assessment tools were evaluated and monitored through...with increased access, VA maintained the frequency of encounters for treatment of PTSD and other MH conditions in Veterans of prior eras. To forecast

  3. Advanced Space Suit PLSS 2.0 Cooling Loop Evaluation and PLSS 2.5 Recommendations

    NASA Technical Reports Server (NTRS)

    Steele, John; Quinn, Greg; Campbell, Colin; Makinen, Janice; Watts, Carly; Westheimer, David

    2016-01-01

    From 2012 to 2015 The NASA/JSC AdvSS (Advanced Space Suit) PLSS (Portable Life Support Subsystem) team, with support from UTC Aerospace Systems, performed the build-up, packaging and testing of PLSS 2.0. One aspect of that testing was the evaluation of the long-term health of the water cooling circuit and the interfacing components. Periodic and end-of-test water, residue and hardware analyses provided valuable information on the status of the water cooling circuit, and the approaches that would be necessary to enhance water cooling circuit health in the future. The evaluated data has been consolidated, interpreted and woven into an action plan for the maintenance of water cooling circuit health for the planned FY (fiscal year) 2016 through FY 2018 PLSS 2.5 testing. This paper provides an overview of the PLSS 2.0 water cooling circuit findings and the associated steps to be taken in that regard for the PLSS 2.5.

  4. NASA Accountability Report

    NASA Technical Reports Server (NTRS)

    1997-01-01

    NASA is piloting fiscal year (FY) 1997 Accountability Reports, which streamline and upgrade reporting to Congress and the public. The document presents statements by the NASA administrator, and the Chief Financial Officer, followed by an overview of NASA's organizational structure and the planning and budgeting process. The performance of NASA in four strategic enterprises is reviewed: (1) Space Science, (2) Mission to Planet Earth, (3) Human Exploration and Development of Space, and (4) Aeronautics and Space Transportation Technology. Those areas which support the strategic enterprises are also reviewed in a section called Crosscutting Processes. For each of the four enterprises, there is discussion about the long term goals, the short term objectives and the accomplishments during FY 1997. The Crosscutting Processes section reviews issues and accomplishments relating to human resources, procurement, information technology, physical resources, financial management, small and disadvantaged businesses, and policy and plans. Following the discussion about the individual areas is Management's Discussion and Analysis, about NASA's financial statements. This is followed by a report by an independent commercial auditor and the financial statements.

  5. Advanced Space Suit PLSS 2.0 Cooling Loop Evaluation and PLSS 2.5 Recommendations

    NASA Technical Reports Server (NTRS)

    Steele, John; Quinn, Greg; Campbell, Colin; Makinen, Janice; Watts, Carly; Westheimer, Dave

    2016-01-01

    From 2012 to 2015 The NASA/JSC AdvSS (Advanced Space Suit) PLSS (Primary Life Support Subsystem) team, with support from UTC Aerospace Systems, performed the build-up, packaging and testing of PLSS 2.0. A key aspect of that testing was the evaluation of the long-term health of the water cooling circuit and the interfacing components. Intermittent and end-of-test water, residue and hardware analyses provided valuable information on the status of the water cooling circuit, and the approaches that would be necessary to enhance water cooling circuit health in the future. The evaluated data has been consolidated, interpreted and woven into an action plan for the maintenance of water cooling circuit health for the planned FY (fiscal year) 2016 through FY 2018 PLSS 2.5 testing. This paper provides an overview of the PLSS 2.0 water cooling circuit findings and the associated steps to be taken in that regard for the PLSS 2.5 testing.

  6. FY 2016 - Stockpile Stewardship and Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2015-03-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  7. National Aeronautics and Space Administration FY 2001 Accountability Report

    NASA Technical Reports Server (NTRS)

    2001-01-01

    The National Aeronautics and Space Administration (NASA) is an independent Agency established to plan and manage the future of the Nation's civil aeronautics and space program. This Accountability Report covers Federal Fiscal Year (FY) 2001 (October 1, 2000, through September 30, 2001), with discussion of some subsequent events The Report contains an overview addressing the Agency's critical programs and financial performance and includes highlights of performance organized by goals and objectives of the Enterprises and Crosscutting Processes. The Report also summarizes NASA's stewardship over budget and financial resources, including audited financial statements and footnotes. The financial statements reflect an overall position of offices and activities, including assets and liabilities, as well as results of operations, pursuant to requirements of Federal law (31 U.S.C. 3515(b)). The auditor's opinions on NASA's financial statements, reports on internal controls, and compliance with laws and regulations are included in this Report.

  8. Underground Test Area Fiscal Year 2013 Annual Quality Assurance Report Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krenzien, Susan; Marutzky, Sam

    This report is required by the Underground Test Area (UGTA) Quality Assurance Plan (QAP) and identifies the UGTA quality assurance (QA) activities for fiscal year (FY) 2013. All UGTA organizations—U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO); Desert Research Institute (DRI); Lawrence Livermore National Laboratory (LLNL); Los Alamos National Laboratory (LANL); Navarro-Intera, LLC (N-I); National Security Technologies, LLC (NSTec); and the U.S. Geological Survey (USGS)—conducted QA activities in FY 2013. The activities included conducting assessments, identifying findings and completing corrective actions, evaluating laboratory performance, and publishing documents. In addition, integrated UGTA required reading and correctivemore » action tracking was instituted.« less

  9. Notification: Follow-Up on Significant Information Technology Security Findings and Recommendations

    EPA Pesticide Factsheets

    Project #OA-FY14-0056, January 17, 2014. The EPA OIG plans to begin preliminary research to follow up on recommendations issued in its final reports between specific fiscal years, and reports associated with the FY 2013 OIG Management Challenges memo.

  10. 2009 DOE Vehicle Technologies Program Annual Merit Review

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none,

    2009-10-01

    Annual Merit Review and Peer Evaluation Meeting to review the FY2008 accomplishments and FY2009 plans for the Vehicle Technologies Program, and provide an opportunity for industry, government, and academic to give inputs to DOE on the Program with a structured and formal methodology.

  11. Annual Defense Department Report FY 1973

    DTIC Science & Technology

    1972-02-22

    program of combatting Sickle- Cell Anemia. Finally, as we approach an all-volunteer force we will continually assess our recruiting and retention programs...GNP devoted to Defense continues to decline -- from 7.0% in FY 1972 to 6.4% in FY 1973. This is a 22 year low. 59 We also are requesting a suplemental ...complement Total Force Planning. Some of these initiatives will fall in areas where the U.S. bears the primary responsibility, while others stem from

  12. Afghanistan: Narcotics and U.S. Policy

    DTIC Science & Technology

    2009-04-21

    Purpose FY2008 Defense Appropriation P.L. 110-116 FY2008 Bridge Fund P.L. 110-161 (Division L ) FY2008 Supplemental P.L. 110-252 (Title...Glasser, “U.S. Backing Helps Warlord Solidify Power,” Washington Post, February 18, 2002; Ron Moreau and Sami Yousafzai, with Donatella Lorch, “Flowers of...dangers of narcotics use and to monitor and prevent drug use. Testimony of Lt. Gen. Walter L . Sharp, Director of Strategic Plans (J-5), Before the

  13. Automation and robotics human performance

    NASA Technical Reports Server (NTRS)

    Mah, Robert W.

    1990-01-01

    The scope of this report is limited to the following: (1) assessing the feasibility of the assumptions for crew productivity during the intra-vehicular activities and extra-vehicular activities; (2) estimating the appropriate level of automation and robotics to accomplish balanced man-machine, cost-effective operations in space; (3) identifying areas where conceptually different approaches to the use of people and machines can leverage the benefits of the scenarios; and (4) recommending modifications to scenarios or developing new scenarios that will improve the expected benefits. The FY89 special assessments are grouped into the five categories shown in the report. The high level system analyses for Automation & Robotics (A&R) and Human Performance (HP) were performed under the Case Studies Technology Assessment category, whereas the detailed analyses for the critical systems and high leverage development areas were performed under the appropriate operations categories (In-Space Vehicle Operations or Planetary Surface Operations). The analysis activities planned for the Science Operations technology areas were deferred to FY90 studies. The remaining activities such as analytic tool development, graphics/video demonstrations and intelligent communicating systems software architecture were performed under the Simulation & Validations category.

  14. Research administration, state planning & research part II program : FY2012 at-a-glance.

    DOT National Transportation Integrated Search

    2012-01-01

    This publication presents a summary of Research and Library funding statistics and project progress for Fiscal Year (FY) 2012. The tables on pages 2 through 7 list all MDOT-funded research projects by focus area that were active or completed during 2...

  15. Research administration, state planning & research part II program : FY2013 at-a-glance.

    DOT National Transportation Integrated Search

    2014-01-01

    This publication presents a summary of Research and Library funding statistics and project progress for Fiscal Year : (FY) 2013. The tables on pages 2 through 7 list all MDOT-funded research projects by topic area that were active : or completed duri...

  16. Metrication report to the Congress

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The principal NASA metrication activities for FY 1989 were a revision of NASA metric policy and evaluation of the impact of using the metric system of measurement for the design and construction of the Space Station Freedom. Additional studies provided a basis for focusing follow-on activity. In FY 1990, emphasis will shift to implementation of metric policy and development of a long-range metrication plan. The report which follows addresses Policy Development, Planning and Program Evaluation, and Supporting Activities for the past and coming year.

  17. 78 FR 23245 - FY2013 Supplemental Funding for Brownfields Revolving Loan Fund (RLF) Grantees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-18

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9789-7] FY2013 Supplemental Funding for Brownfields Revolving... Availability of Funds. SUMMARY: EPA's Office of Brownfields and Land Revitalization (OBLR) plans to make... Response, Compensation and Liability Act (CERCLA), 42 U.S.C. 9604(k)(3). Brownfields Cleanup Revolving Loan...

  18. 77 FR 16030 - FY2012 Supplemental Funding for Brownfields Revolving Loan Fund (RLF) Grantees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-19

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9649-8] FY2012 Supplemental Funding for Brownfields Revolving... availability of funds. SUMMARY: EPA's Office of Brownfields and Land Revitalization (OBLR) plans to make... Response, Compensation and Liability Act (CERCLA), 42 U.S.C. 9604(k)(3). Brownfields Cleanup Revolving Loan...

  19. Colorado Children's Budget 2012

    ERIC Educational Resources Information Center

    Buck, Beverly; Cuciti, Peggy L.; Baker, Robin

    2012-01-01

    The "Colorado Children's Budget 2012" examines the state's commitment to investing in the well-being of children. It tallies up Colorado's actual and planned investment during the past five years (Fiscal Year (FY) 2008-2009 through FY 2012-2013) on programs and services in four areas: Early Childhood Learning and Development, K-12…

  20. 77 FR 67635 - Fiscal Year 2013 Draft Work Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-13

    ... principles: In FY 2013 no project specific direction was provided by Congress. The Energy and Water... FY2013. All Energy and Water Appropriation funds, including operating funds, designated as ``up to'' may...., Energy and Water Appropriation, USDA-RUS, etc.). The grand total for all appropriations appears at the...

  1. 77 FR 24538 - Sunshine Act; Audit Committee Meeting of the Board of Directors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... NEIGHBORHOOD REINVESTMENT CORPORATION Sunshine Act; Audit Committee Meeting of the Board of.... Executive Session with Internal Audit Director IV. Executive Session with Officers: Pending Litigation V. Internal Audit Report with Management's Response VI. Amendment to the FY 2012 Internal Audit Plan VII. FY...

  2. DOD Civilian and Contractor Workforces: Additional Cost Savings Data and Efficiencies Plan are Needed

    DTIC Science & Technology

    2016-10-01

    reductions reported in average strength bNumber of reductions reported in full-time equivalents Note: DOD costs savings provided for the prior FY are...comparing costs from FY 2012 to FY 2017, and not each year in between. Further, officials stated that DOD did not include full- time equivalents ...Application FTE Full-time Equivalent NDAA National Defense Authorization Act This is a work of the U.S. government and is not subject to copyright

  3. FY 1990/FY 1991 Biennial Budget Descriptive Summaries for the Strategic Defense Initiative Organization

    DTIC Science & Technology

    1989-01-01

    size, weight , power consumption, and radiation hardness, and on software algorithm validity and efficiency. 3. (U) Collection of radar, ctical, and...which have potential to achieve cooling requirements for LWIR sensors with far smaller weight and power penalties. (U) FY1989 Planned Program: o (U...two dollars for every SDI dollar. o (U) Inverted gaili--n arsenide by growing a razor-thin layer of silicon on GaAs and thus cut power loss by two

  4. OMEGA FY13 HED requests - LANL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Workman, Jonathan B; Loomis, Eric N

    2012-06-25

    This is a summary of scientific work to be performed on the OMEGA laser system located at the Laboratory for Laser Energetics in Rochester New York. The work is funded through Science and ICF Campagins and falls under the category of laser-driven High-Energy Density Physics experiments. This summary is presented to the Rochester scheduling committee on an annual basis for scheduling and planning purposes.

  5. Year-End Review & FY15 Projections (Naval Supply Systems Command)

    DTIC Science & Technology

    2014-08-12

    Industries  and/or  socio-­‐economic  Concerns   Plan  to  Increase  SB  performance   Knowing our $mall Business SB – 26.0%, SDB ...26.0% SDB – 8.0% SDVOSB – 3.5% WOSB – 6.6% HUBZone – 0.6% Sweetspot – 81% N/A •  Expiring services contract deep-dive analysis initiative

  6. Training and Personnel Systems Technology R&D Program Description FY 1988/1989. Revision

    DTIC Science & Technology

    1988-05-20

    scenario software /database, and computer generated imagery (CIG) subsystem resources; (d) investigation of feasibility of, and preparation of plans... computer language to Army flight simulator for demonstration and evaluation. The objective is to have flight simulators which use the same software as...the Automated Performance and Readiness Training System (APARTS), which is a computer software system which facilitates training management through

  7. Department of Defense Chemical and Biological Defense Program. FY2004-2006 Performance Plan

    DTIC Science & Technology

    2005-03-01

    Agents (NTAs) Compare the direct effects of PAF on smooth muscle, hematic constituents, and lung to determine role in toxicity. Continue to identify...Range Biometric Target ID System Explore technologies for a long range biometric target identification system. Air Containment Monitoring System...Continue development of systems for contained air monitoring for chemical agents.Long Range Biometric Air Containment Monitoring System Continued

  8. Research and development program plan for the Center for Engineering Systems Advanced Research (CESAR)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weisbin, C.R.; Hamel, W.R.; Barhen, J.

    1986-02-01

    The Oak Ridge National Laboratory has established the Center for Engineering Systems Advanced Research (CESAR) for the purpose of addressing fundamental problems of intelligent machine technologies. The purpose of this document is to establish a framework and guidelines for research and development within ORNL's CESAR program in areas pertaining to intelligent machines. The specific objective is to present a CESAR Research and Development Plan for such work with a planning horizon of five to ten years, i.e., FY 1985 to FY 1990 and beyond. As much as possible, the plan is based on anticipated DOE needs in the area ofmore » productivity increase and safety to the end of this century.« less

  9. Advanced rural transportation systems (ARTS) : rural intelligent transportation systems (ITS) : program plan

    DOT National Transportation Integrated Search

    1996-08-01

    This Program Plan for the Advanced Rural Transportation Systems (ARTS) implements the goals and objectives established in the U.S. Department of Transportations (USDOTs) Strategic Plan for the ARTS. This Program Plan proposes five years (FY 97...

  10. Summary of FY 17 Assessments Sandia National Laboratories: Evaluation of FY16 SNL FCT M2 Milestone Deliverables

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Appel, Gordon John

    This report is the milestone deliverable M4FT-17SN111102091 “Summary of Assessments Performed FY17 by SNL QA POC” for work package FT-17SN11110209 titled “Quality Assurance – SNL”. This report summarizes the FY17 assessment performed on Fuel Cycle Technologies / Spent Fuel and Waste Disposition efforts.

  11. Planning and Budgeting for Nutrition Programs in Tanzania: Lessons Learned From the National Vitamin A Supplementation Program.

    PubMed

    Lyatuu, Margaret Benjamin; Mkumbwa, Temina; Stevenson, Raz; Isidro, Marissa; Modaha, Francis; Katcher, Heather; Dhillon, Christina Nyhus

    2016-05-03

    Micronutrient deficiency in Tanzania is a significant public health problem, with vitamin A deficiency (VAD) affecting 34% of children aged 6 to 59 months. Since 2007, development partners have worked closely to advocate for the inclusion of twice-yearly vitamin A supplementation and deworming (VASD) activities with budgets at the subnational level, where funding and implementation occur. As part of the advocacy work, a VASD planning and budgeting tool (PBT) was developed and is used by district officials to justify allocation of funds. Helen Keller International (HKI) and the Tanzania Food and Nutrition Centre (TFNC) conduct reviews of VASD funds and health budgets annually in all districts to monitor the impact of advocacy efforts. This paper presents the findings of the fiscal year (FY) 2010 district budget annual review. The review was intended to answer the following questions regarding district-level funding: (1) how many funds were allocated to nutrition-specific activities in FY 2010? (2) how many funds were allocated specifically to twice-yearly VASD activities in FY 2010? and (3) how have VASD funding allocations changed over time? Budgets from all 133 districts in Tanzania were accessed, reviewed and documented to identify line item funds allocated for VASD and other nutrition activities in FY 2010. Retrospective data from prior annual reviews for VASD were used to track trends in funding. The data were collected using specific data forms and then transcribed into an excel spreadsheet for analysis. The total funds allocated in Tanzania's districts in FY 2010 amounted to US$1.4 million of which 92% were for VASD. Allocations for VASD increased from US$0.387 million to US$1.3 million between FY 2005 and FY 2010. Twelve different nutrition activities were identified in budgets across the 133 districts. Despite the increased trend, the percentage of districts allocating sufficient funds to implement VAS (as defined by cost per child) was just 21%. District-driven VAS funding in Tanzania continues to be allocated by districts consistently, although adequacy of funding is a concern. However, regular administrative data point to fairly high and consistent coverage rates for VAS across the country (over 80% over the last 10 years). Although this analysis may have omitted some nutrition-specific funding not identified in district budget data, it represents a reliable reflection of the nutrition funding landscape in FY 2010. For this year, total district nutrition allocations add up to only 2% of the amount needed to implement nutrition services at scale according to Tanzania's National Nutrition Strategy Implementation Plan. VASD advocacy and planning support at the district level has succeeded in ensuring district allocations for the program. To promote sustainable implementation of other nutrition interventions in Tanzania, more funds must be allocated and guidance must be accompanied by tools that enable planning and budgeting at the district level. © 2016 by Kerman University of Medical Sciences

  12. Planning and Budgeting for Nutrition Programs in Tanzania: Lessons Learned From the National Vitamin A Supplementation Program

    PubMed Central

    Lyatuu, Margaret Benjamin; Mkumbwa, Temina; Stevenson, Raz; Isidro, Marissa; Modaha, Francis; Katcher, Heather; Dhillon, Christina Nyhus

    2016-01-01

    Background: Micronutrient deficiency in Tanzania is a significant public health problem, with vitamin A deficiency (VAD) affecting 34% of children aged 6 to 59 months. Since 2007, development partners have worked closely to advocate for the inclusion of twice-yearly vitamin A supplementation and deworming (VASD) activities with budgets at the subnational level, where funding and implementation occur. As part of the advocacy work, a VASD planning and budgeting tool (PBT) was developed and is used by district officials to justify allocation of funds. Helen Keller International (HKI) and the Tanzania Food and Nutrition Centre (TFNC) conduct reviews of VASD funds and health budgets annually in all districts to monitor the impact of advocacy efforts. This paper presents the findings of the fiscal year (FY) 2010 district budget annual review. The review was intended to answer the following questions regarding district-level funding: (1) how many funds were allocated to nutrition-specific activities in FY 2010? (2) how many funds were allocated specifically to twice-yearly VASD activities in FY 2010? and (3) how have VASD funding allocations changed over time? Methods: Budgets from all 133 districts in Tanzania were accessed, reviewed and documented to identify line item funds allocated for VASD and other nutrition activities in FY 2010. Retrospective data from prior annual reviews for VASD were used to track trends in funding. The data were collected using specific data forms and then transcribed into an excel spreadsheet for analysis. Results: The total funds allocated in Tanzania’s districts in FY 2010 amounted to US$1.4 million of which 92% were for VASD. Allocations for VASD increased from US$0.387 million to US$1.3 million between FY 2005 and FY 2010. Twelve different nutrition activities were identified in budgets across the 133 districts. Despite the increased trend, the percentage of districts allocating sufficient funds to implement VAS (as defined by cost per child) was just 21%. Discussion: District-driven VAS funding in Tanzania continues to be allocated by districts consistently, although adequacy of funding is a concern. However, regular administrative data point to fairly high and consistent coverage rates for VAS across the country (over 80% over the last 10 years). Although this analysis may have omitted some nutrition-specific funding not identified in district budget data, it represents a reliable reflection of the nutrition funding landscape in FY 2010. For this year, total district nutrition allocations add up to only 2% of the amount needed to implement nutrition services at scale according to Tanzania’s National Nutrition Strategy Implementation Plan. Conclusion: VASD advocacy and planning support at the district level has succeeded in ensuring district allocations for the program. To promote sustainable implementation of other nutrition interventions in Tanzania, more funds must be allocated and guidance must be accompanied by tools that enable planning and budgeting at the district level. PMID:27694649

  13. Molecular characterization of the Fy(a-b-) phenotype in a Polish family.

    PubMed

    Karolak, Ewa; Grodecka, Magdalena; Suchanowska, Anna; Klausa, Elżbieta; Bochenek, Stanisława; Majorczyk, Edyta; Czerwiński, Marcin; Waśniowska, Kazimiera

    2013-10-01

    The Fy(a-b-) phenotype, very rare in Caucasians and defined by the homozygous FY(*)B-33 allele, is associated with the -33T>C mutation in the promoter region of the FY gene. The allele FY(*)X is correlated with weak expression of Fy(b) antigen due to 265C>T and 298G>A mutations in FY(*)B allele. The purpose of this study was molecular characterization of Fy blood group antigens in Fy(a-b-) members of a Polish family. High-resolution melting analysis was performed to detect single nucleotide polymorphisms in amplified fragments of the FY gene. The Fy(a-b-) phenotype in three siblings of the Polish family was caused by the FY(*)X/FY(*)B-33 genotype. Copyright © 2013 Elsevier Ltd. All rights reserved.

  14. Notification: EPA's Processes for Preserving Emails and Text Messages, and Responding to Freedom of Information Act Requests

    EPA Pesticide Factsheets

    Project #OA&E-FY18-0217, May 17, 2018. The OIG plans to begin fieldwork to follow up on significant information technology security findings and recommendations noted in OIG reports, as well as to look into a hotline allegation received in FY 2018.

  15. The NASA Electronic Parts and Packaging (NEPP) Program: Roadmap for FY15 and Beyond and Recent Radiation Highlights

    NASA Technical Reports Server (NTRS)

    LaBel, Kenneth A.; Sampson, Michael J.

    2015-01-01

    This presentation is a NASA Electronic Parts and Packaging (NEPP) Program: Roadmap for FY15 and Beyond. This roadmap provides a snapshot for current plans and collaborations on testing and evaluation of electronics as well as a discussion of the technology selection approach.

  16. 76 FR 2905 - FY2011 Supplemental Funding for Brownfields Revolving Loan Fund (RLF) Grantees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-18

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9254-1] FY2011 Supplemental Funding for Brownfields Revolving... availability of funds. SUMMARY: EPA's Office of Brownfields and Land Revitalization (OBLR) plans to make..., Compensation and Liability Act (CERCLA), 42 U.S.C. 9604(k)(3). Brownfields Cleanup Revolving Loan Fund (BCRLF...

  17. 75 FR 10793 - FY2010 Supplemental Funding for Brownfields Revolving Loan Fund (RLF) Grantees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-09

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9124-3] FY2010 Supplemental Funding for Brownfields Revolving... Availability of Funds. SUMMARY: EPA's Office of Brownfields and Land Revitalization (OBLR) plans to make..., Compensation and Liability Act (CERCLA), 42 U.S.C. 9604(k)(3). Brownfields Cleanup Revolving Loan Fund (BCRLF...

  18. 75 FR 69134 - Submission for OMB Review, Comment Request, Proposed Collection: Public Libraries Survey, FY 2011...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-10

    ..., Office of Policy, Planning, Research, and Communication, Institute of Museum and Library Services, 1800 M..., Proposed Collection: Public Libraries Survey, FY 2011-2013 AGENCY: Institute of Museum and Library Services.... SUMMARY: The Institute of Museum and Library Services announces the following information collection has...

  19. 78 FR 25591 - Magnuson-Stevens Act Provisions; Fisheries of the Northeastern United States; Northeast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-02

    ... details the method for initial ACE sub-allocation to sector members. For FY 2013, each sector has proposed... for the sectors to operate. The NE Multispecies Fishery Management Plan (FMP) allows limited access... accepting additional public comment on the revised explanation of at-sea monitoring (ASM) coverage for FY...

  20. Kansas Public Television Network (KPTN).

    ERIC Educational Resources Information Center

    Lemen, Jack A.

    The plans of the Kansas Public Television Board (KPTB) for development of the Kansas Television Network are detailed for the period extending from FY 1979 to FY 1983; the proposed system is designed to serve the needs of the communities by extending existing capabilities and resources, sharing common resources, and enriching the total system.…

  1. FY polymorphisms and vivax malaria in inhabitants of Amazonas State, Brazil.

    PubMed

    Albuquerque, Sérgio Roberto Lopes; Cavalcante, Francimary de Oliveira; Sanguino, Edalton Cesar; Tezza, Lucianna; Chacon, Fernanda; Castilho, Lilian; dos Santos, Maria Cristina

    2010-04-01

    Although the importance of glycoprotein Duffy in the human red cells invasion process by Plasmodium vivax merozoites has been demonstrated, little is known about the associations of FY polymorphisms with malaria vivax parasitic density. In this study, we investigated the associations of the SNPs 125 G>A, 265 C>T, and 298 G>A on FY gene and the SNP -33T>C on GATA box with the vivax malaria parasitic density in inhabitants of Amazon State, Brazil. Verifications of P. vivax, as well as the definition of parasitism, were determined by standard screening tests in 497 patients. FY phenotyping was performed in all samples by hemagglutination using gel cards. Molecular analysis for FY/GATA polymorphisms were performed by polymerase chain reaction-restriction fragment length polymorphism. Our data showed that in this population, FY*A/FY*B-33 and FY*B/FY*B-33 genotypes may be a selective advantage, reducing the frequency of P. vivax infection in the studied area. FY*A/FY*B and FY*A/FY*A genotypes showed to be associated with the rise of the frequency of P. vivax infection, and FY*B/FY*X and FY*A/FY*X showed to be associated with the low levels of parasitism. These results suggest that natural adaptations, in malaria-endemic regions, could be leading to the arising of partial defense mechanisms against P. vivax, which is different from the previously described in African descents, as well as adaptations that could be increasing the susceptibility of human to this kind of malaria.

  2. NSF Geosciences Initiatives and Plans Reviewed at Advisory Committee Meeting

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2010-10-01

    In its semiannual meeting on 6-7 October, the U.S. National Science Foundation's (NSF) Advisory Committee for Geosciences (GEO) reviewed GEO initiatives, programs, and plans, including the GEO directorate's fast and significant response to support research related to various aspects of the Deepwater Horizon oil spill in the Gulf of Mexico through Rapid Response Research (RAPID) awards and other measures. An undercurrent during the meeting was concern about workload stress among GEO staff. Assistant director of geosciences Tim Killeen noted that the proposed budget for fiscal year (FY) 2011, which began on 1 October, would increase directorate funding 7.4% over FY 2010, if the budget is approved by Congress. A continuing resolution in Congress maintains FY 2010 funding levels until at least 3 December. Killeen said NSF's budget request for FY 2012 has been submitted to the White House Office of Management and Budget, adding that although he cannot discuss details of that budget yet, GEO Vision, a long­range strategy document for the directorate released in October 2009, “is reflected in our thinking going forward.”

  3. FY2010 ANNUAL REVIEW E-AREA LOW-LEVEL WASTE FACILITY PERFORMANCE ASSESSMENT AND COMPOSITE ANALYSIS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Butcher, T.; Swingle, R.; Crapse, K.

    2011-01-01

    The E-Area Low-Level Waste Facility (ELLWF) consists of a number of disposal units described in the Performance Assessment (PA)(WSRC, 2008b) and Composite Analysis (CA)(WSRC, 1997; WSRC, 1999): Low-Activity Waste (LAW) Vault, Intermediate Level (IL) Vault, Trenches (Slit Trenches [STs], Engineered Trenches [ETs], and Component-in-Grout [CIG] Trenches), and Naval Reactor Component Disposal Areas (NRCDAs). This annual review evaluates the adequacy of the approved 2008 ELLWF PA along with the Special Analyses (SAs) approved since the PA was issued. The review also verifies that the Fiscal Year (FY) 2010 low-level waste (LLW) disposal operations were conducted within the bounds of the PA/SAmore » baseline, the Savannah River Site (SRS) CA, and the Department of Energy (DOE) Disposal Authorization Statement (DAS). Important factors considered in this review include waste receipts, results from monitoring and research and development (R&D) programs, and the adequacy of controls derived from the PA/SA baseline. Sections 1.0 and 2.0 of this review are a summary of the adequacy of the PA/SA and CA, respectively. An evaluation of the FY2010 waste receipts and the resultant impact on the ELLWF is summarized in Section 3.1. The results of the monitoring program, R&D program, and other relevant factors are found in Section 3.2, 3.3 and 3.4, respectively. Section 4.0 contains the CA annual determination similarly organized. SRS low-level waste management is regulated under DOE Order 435.1 (DOE, 1999a) and is authorized under a DAS as a federal permit. The original DAS was issued by the DOE-Headquarters (DOE-HQ) on September 28, 1999 (DOE, 1999b) for the operation of the ELLWF and the Saltstone Disposal Facility (SDF). The 1999 DAS remains in effect for the regulation of the SDF. Those portions of that DAS applicable to the ELLWF were superseded by revision 1 of the DAS on July 15, 2008 (DOE, 2008b). The 2008 PA and DAS were officially implemented by the facility on October 31, 2008 and are the authorization documents for this FY2010 Annual Review. Department of Energy Headquarters approval of the 2008 DAS was subject to numerous conditions specified in the document. Two of those conditions are to update the ELLWF closure plan and monitoring plan to align with the conceptual model analyzed in the PA. Both of these conditions were met with the issuance of the PA Monitoring Plan (Millings, 2009a) and the Closure Plan (Phifer et al, 2009a). The PA Monitoring Plan was approved by DOE on July 22, 2009 and the Closure Plan was approved by DOE on May 21, 2009. Both will be updated as needed to remain consistent with the PA. The DAS also specifies that the maintenance plan include activities to resolve each of the secondary issues identified in the DOEHQ review of the 2008 PA that were not completely addressed either with supplemental material provided to the review team or in final revisions to the PA. These outstanding issues were originally documented in the 2008 update of the PA/CA Maintenance Plan (WSRC, 2008a) and in subsequent PA/CA Maintenance Plans (most recently SRNS, 2010a) as required and are actively being worked.« less

  4. Implementation plan for underground waste storage tank surveillance and stabilization improvements

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dukelow, G.T.; Maupin, V.D.; Mihalik, L.A.

    1989-04-01

    Several studies have addressed the need to upgrade the methods currently used for surveillance of underground waste storage tanks, particularly single-shell tanks (SST), which are susceptible to leaks and intrusions. Fifty tasks were proposed to enhance the existing surveillance program; however, prudent budget management dictates that only the tasks with the highest potential for success be selected and funded. This plan identifies fourteen inexpensive improvements that may be implemented in less than two years. Recent developments stress the need to complete interim stabilization of these tanks more quickly than now budgeted and to identify methods to salvage or eliminate themore » interstitial liquid left behind after saltwell jet-pumping. The plan calls for the use of available resources to remove saltwell liquid from SSTs as rapidly as possible rather than committing to new surveillance technologies that might not lead to near-term improvements. This plan describes the selection criteria and provides cost estimates and schedules for implementing the recommendations of the task forces. The proposed improvements result in completion of jet-pumping in FY 1994, two years ahead of the current FY 1996 milestone. While the accelerated plan requires more funding in the early years, the total cost will be the same as completing the work in FY 1996.« less

  5. Biological and Environmental Research Program at Oak Ridge National Laboratory, FY 1992--1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report is the 1992--1994 Program Director's Overview Report for Oak Ridge National Laboratory's (ORNL's) Biological and Environmental Research (BER) Program, and as such it addresses KP-funded work at ORNL conducted during FY 1991 and in progress during FY 1992; it also serves as a planning document for the remainder of FY 1992 through FY 1994. Non-BER funded work at ORNL relevant to the mission of OHER is also discussed. The second section of the report describes ORNL facilities and resources used by the BER program. The third section addresses research management practices at ORNL. The fourth, fifth, and sixthmore » sections address BER-funded research in progress, program accomplishments and research highlights, and program orientation for the remainder of FY 1992 through FY 1994, respectively. Work for non-BER sponsors is described in the seventh section, followed by a discussion of significant near and long-term issues facing BER work at ORNL in the eighth section. The last section provides a statistical summary of BER research at ORNL. Appendices supplement the above topics with additional detail.« less

  6. Nasa Program Plan

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Major facts are given for NASA'S planned FY-1981 through FY-1985 programs in aeronautics, space science, space and terrestrial applications, energy technology, space technology, space transportation systems, space tracking and data systems, and construction of facilities. Competition and cooperation, reimbursable launchings, schedules and milestones, supporting research and technology, mission coverage, and required funding are considered. Tables and graphs summarize new initiatives, significant events, estimates of space shuttle flights, and major missions in astrophysics, planetary exploration, life sciences, environmental and resources observation, and solar terrestrial investigations. The growth in tracking and data systems capabilities is also depicted.

  7. Solar System Exploration Division Strategic Plan, volume 1. Executive summary and overview

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This first document is the first of a six-volume series presenting the Solar System Exploration Division's Strategic Plan for the 10-year period FY 1994 to FY 2003. The overall strategy is characterized by five fundamental precepts: (1) execute the current program; (2) improve the vitality of the program and the planetary science community; (3) initiate innovative, small, low-cost planetary missions; (4) initiate new major and moderate missions; and (5) prepare for the next generation of missions. This Strategic Plan describes in detail our proposed approach to accomplish these goals. Volume 1 provides first an Executive Summary of highlights of each of the six volumes, and then goes on to present an overview of the plan, including a discussion of the planning context and strategic approach. Volumes 2, 3, 4, and 5 describe in detail the initiatives proposed. An integral part of each of these volumes is a set of responses to the mission selection criteria questions developed by the Space and Earth Science Advisory Committee. Volume 2, Mission From Planet Earth, describes a strategy for exploring the Moon and Mars and sets forth proposed moderate missions--Lunar Observer and a Mars lander network. Volume 3, Pluto Flyby/Neptune Orbiter, discusses our proposed major new start candidate for the FY 1994 to FY 1998 time frame. Volume 4, Discovery, describes the Near-Earth Asteroid Rendezvous, as well as other candidates for this program of low-cost planetary missions. Volume 5, Toward Other Planetary Systems, describes a major research and analysis augmentation that focuses on extrasolar planet detection and the study of planetary system processes. Finally, Volume 6 summarizes the technology program that the division has structured around these four initiatives.

  8. The 1989 long-range program plan

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The President's National Space Policy of 1988 reaffirms that space activities serve a variety of vital national goals and objectives, including the strengthening of U.S. scientific, technological, political, economic, and international leadership. The new policy stresses that civil space activities contribute significantly to enhancing America's world leadership. Goals and objectives must be defined and redefined, and each advance toward a given objective must be viewed as a potential building block for future programs. This important evolutionary process for research and development is reflected, describing NASA's program planning for FY89 and later years. This plan outlines the direction of NASA's future activities by discussing goals, objectives, current programs, and plans for the future. The 1989 plan is consistent with national policy for both space and aeronautics, and with the FY89 budget that the President submitted to Congress in February 1988.

  9. 77 FR 66947 - Magnuson-Stevens Act Provisions; Fisheries of the Northeastern United States; Northeast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-08

    ... NMFS, copies of addenda to FY 2012 sector operations plans detailing industry-funded monitoring plans... from Federal fishing regulations through its annual operations plan (for more information on sector operations plans and regulatory exemptions, see the fishing year 2012 sector operations plan proposed rule...

  10. Report of the Secretary of Defense Caspar W. Weinberger to the Congress on the FY 1987 Budget, FY 1988 Authorization Request and FY 1987-1991 Defense Programs, February 5, 1986

    DTIC Science & Technology

    1986-02-05

    saries. When have these values -- freedom of individual citizens, democratically chosen governments, market economies, and a lawful international economic...to the plan of action for pene- trating a new market . In addition to the broad goals of the firm, strategy encompasses key operating policies by...threats on the other. A sustainable corporate strategy must match the particular strengths of the corporation with competitive forces in its markets

  11. Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress

    DTIC Science & Technology

    2016-03-08

    Search Radar modification to CVN–79 and CVN–80. (G) A business case analysis for the two-phase CVN–79 delivery proposal and impact on fleet...the start-stop-start-stop cycle over a stretched period of time and that’s a big cost impact . But the challenge is by the same token, the build cycle...What are the estimated savings of this proposal in FY2017, and over the FY2017-FY2021 Future Years Defense Plan (FYDP)?  What impact would

  12. Department of Defense Strategic Sustainability Performance Plan FY 2012

    DTIC Science & Technology

    2012-01-01

    electricity consumption by 2020. Over FYs 2012 and 2013, DON will determine which installations have the best opportunity to cost- effectively achieve net...continental United States, to more effectively track fuel consumption and monitor and reduce vehicle idling. With the support of other private and...biofuel is the most effective way to reduce fleet petroleum consumption . In locations where biofuel is not available, the fleet should consider

  13. Department of Defense Chemical and Biological Defense Program. FY2002-2004 Performance Plan. Volume 2

    DTIC Science & Technology

    2003-04-01

    agents identified by in vitro assays in mouse models. Studied the effect of immunomodulators on the host response to Burkholderia mallei ( glanders ...identifiers) of various isolates of the organism responsible for plague (Y. pestis), glanders (B. mallei ), and anthrax (B. anthracis). Evaluate...suitable animal models. Study the effect of immunomodulators on the host response to B. mallei and Y. pestis candidate vaccines; identify those

  14. Office of Science and Technology&International Year EndReport - 2005

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bodvarsson, G.S.

    2005-10-27

    Source Term, Materials Performance, Radionuclide Getters, Natural Barriers, and Advanced Technologies, a brief introduction in each section describes the overall organization and goals of each program area. All of these areas have great potential for improving our understanding of the safety performance of the proposed Yucca Mountain repository, as processes within these areas are generally very conservatively represented in the Total System Performance Assessment. In addition, some of the technology thrust areas in particular may enhance system efficiency and reduce risk to workers. Thus, rather modest effort in the S&T Program could lead to large savings in the lifetime repositorymore » total cost and significantly enhanced understanding of the behavior of the proposed Yucca Mountain repository, without safety being compromised, and in some instances being enhanced. An overall strength of the S&T Program is the significant amount of integration that has already been achieved after two years of research. As an example (illustrated in Figure 1), our understanding of the behavior of the total waste isolation system has been enhanced through integration of the Source Term, Materials Performance, and Natural Barriers Thrust areas. All three thrust areas contribute to the integration of different processes in the in-drift environment. These processes include seepage into the drift, dust accumulation on the waste package, brine formation and precipitation on the waste package, mass transfer through the fuel cladding, changes in the seepage-water chemical composition, and transport of released radionuclides through the invert and natural barriers. During FY2005, each of our program areas assembled a team of external experts to conduct an independent review of their respective projects, research directions, and emphasis. In addition, the S&T Program as a whole was independently reviewed by the S&T Programmatic Evaluation Panel. As a result of these reviews, adjustments to the S&T Program will be implemented in FY2006 to ensure that the Program is properly aligned with OCRWM's priorities. Also during FY2005, several programmatic documents were published, including the Science and Technology Program Strategic Plan, the Science and Technology Program Management Plan, and the Science and Technology Program Plan. These and other communication products are available on the OCRWM web site under the Science and Technology section (http://www.ocrwm.doe.gov/osti/index.shtml).« less

  15. NASA Performance Plan

    NASA Technical Reports Server (NTRS)

    1999-01-01

    The Government Performance and Results Act (GPRA) passed by Congress and signed by the President in 1993 provides a new tool to improve the efficiency of all Federal agencies. The goals of GPRA are to: Improve citizen confidence in Government performance; Improve Federal program management, effectiveness, and public accountability; and Improve congressional decisionmaking on where to commit the Nation's financial and human resources. The Act directs Executive Branch agencies to develop a customer-focused strategic plan that aligns activities with concrete missions and goals. The first plans were submitted in September 1998 as part of the Fiscal Year 1999 (FY99) budget process. These budget submissions were expected to support the goals expressed in the agency strategic plans. The Act also directs agencies to manage and measure results to justify congressional appropriations and authorizations. Six months after the completion of the fiscal year, agencies will report on the degree of success in achieving the goals and evaluation measures defined in the strategic and performance plans. The plans required by GPRA have been submitted to the Office of Management and Budget (OMB) and to Congress. Copies of NASA plans are available from the Office of Policy and Plans at NASA Headquarters and can be accessed on the i nterinet web sites identified in the Appendix.

  16. Network speech systems technology program

    NASA Astrophysics Data System (ADS)

    Weinstein, C. J.

    1981-09-01

    This report documents work performed during FY 1981 on the DCA-sponsored Network Speech Systems Technology Program. The two areas of work reported are: (1) communication system studies in support of the evolving Defense Switched Network (DSN) and (2) design and implementation of satellite/terrestrial interfaces for the Experimental Integrated Switched Network (EISN). The system studies focus on the development and evaluation of economical and endurable network routing procedures. Satellite/terrestrial interface development includes circuit-switched and packet-switched connections to the experimental wideband satellite network. Efforts in planning and coordination of EISN experiments are reported in detail in a separate EISN Experiment Plan.

  17. FY 1992-1993 RDT&E Descriptive Summaries: DARPA

    DTIC Science & Technology

    1991-02-01

    combining natural language and user workflow model information. * Determine effectiveness of auditory models as preprocessors for robust speech...for indexing and retrieving design knowledge. * Evaluate ability of message understanding systems to extract crisis -situation data from news wires...energy effects , underwater vehicles, neutrino detection, speech, tailored nuclear weapons, hypervelocity, nanosecond timing, and MAD/RPV. FY 1991 Planned

  18. Basewide energy systems plan for army material and mechanic research center; Volume 1 - executive summary. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1983-08-01

    The report includes the analysis of the energy use patterns at the base and the identification and evaluation of energy conservation opportunities. The obtained results indicate that AMMRC energy use can potentially be reduced 42 percent by FY 1985, compared to the FY 1975 energy use baseline.

  19. 75 FR 33323 - Notice of Availability: Notice of HUD's Fiscal Year (FY) 2010 Notice of Funding Availability...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-11

    ... Fair Housing; (4) Capacity Building and Knowledge Sharing; (5) Using Housing as a Platform for Improving Other Outcomes; and (6) Expanding Cross-Cutting Policy Knowledge. Detailed information on HUD's Strategic Plan for FY2010-2015 is available at: http://portal.hud.gov/portal/page/portal/HUD/program_offices...

  20. Overview Presentation

    NASA Technical Reports Server (NTRS)

    Lytle, John

    2001-01-01

    This report provides an overview presentation of the 2000 NPSS (Numerical Propulsion System Simulation) Review and Planning Meeting. Topics include: 1) a background of the program; 2) 1999 Industry Feedback; 3) FY00 Status, including resource distribution and major accomplishments; 4) FY01 Major Milestones; and 5) Future direction for the program. Specifically, simulation environment/production software and NPSS CORBA Security Development are discussed.

  1. 76 FR 26254 - NOAA's Office of Ocean Exploration and Research (OER) Strategic Plan FY 2011-FY 2015

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-06

    ... the life and health of our planet, and will result in improved societal understanding and management..., marine life and other natural resources or habitats, understanding the dynamics of complex ecosystems... ocean data in new ways to describe the ocean's marine life and features, living and non-living resources...

  2. Billions for biodefense: federal agency biodefense funding, FY2009-FY2010.

    PubMed

    Franco, Crystal

    2009-09-01

    Since 2001, the United States government has spent substantial resources on preparing the nation against a bioterrorist attack. Earlier articles in this series analyzed civilian biodefense funding by the federal government for fiscal years (FY) 2001 through 2009. This article updates those figures with budgeted amounts for FY2010, specifically analyzing the budgets and allocations for biodefense at the Departments of Health and Human Services, Defense, Homeland Security, Agriculture, and State; the Environmental Protection Agency; and the National Science Foundation. This year's article also provides an assessment of the proportion of the biodefense budget that serves multiple programmatic goals and benefits, including research into infectious disease pathogenesis and immunology, public health planning and preparedness, and disaster response efforts. The FY2010 federal budget for civilian biodefense totals $6.05 billion. Of that total, $4.96 billion is budgeted for programs that serve multiple goals and provide manifold benefits.

  3. Short-range transit plan for the Phoenix urbanized area : fiscal years 1982-1986

    DOT National Transportation Integrated Search

    1981-07-21

    Report presents the FY 1980-81 update of the Phoenix, Arizona, urbanized area Short Range Transit Plan. It describes a five-year plan to guide improvements of the public transportation sytem. Planning aspects of the report will be incorporated into t...

  4. Assessment Report Sandia National Laboratories Fuel Cycle Technologies Quality Assurance Evaluation of FY15 SNL FCT M2 Milestone Deliverables

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Appel, Gordon John

    Sandia National Laboratories (SNL) Fuel Cycle Technologies (FCT) program activities are conducted in accordance with FCT Quality Assurance Program Document (FCT-QAPD) requirements. The FCT-QAPD interfaces with SNL approved Quality Assurance Program Description (SNL-QAPD) as explained in the Sandia National Laboratories QA Program Interface Document for FCT Activities (Interface Document). This plan describes SNL's FY16 assessment of SNL's FY15 FCT M2 milestone deliverable's compliance with program QA requirements, including SNL R&A requirements. The assessment is intended to confirm that SNL's FY15 milestone deliverables contain the appropriate authenticated review documentation and that there is a copy marked with SNL R&A numbers.

  5. EPA Brownfields Area-Wide Planning Recipients Selected for FY13 Grant Funding

    EPA Pesticide Factsheets

    EPA has selected the following entities as Brownfields Area-Wide Planning grant recipients. These recipients will work with their local community members, other stakeholders and project partners to develop an area-wide plan and implementation strategy for

  6. FY16 Strategic Themes.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leland, Robert W.

    2017-03-01

    I am pleased to present this summary of the Division 1000 Science and Technology Strategic Plan. This plan was created with considerable participation from all levels of management in Division 1000, and is intended to chart our course as we strive to contribute our very best in service of the greater Laboratory strategy. The plan is characterized by four strategic themes: Mission Engagement, Bold Outcomes, Collaborative Environment, and the Safety Imperative. Each theme is accompanied by a brief vision statement, several goals, and planned actions to support those goals throughout FY16. I want to be clear that this is notmore » a strategy to be pursued in tension with the Laboratory strategic plan. Rather, it is intended to describe “how” we intend to show up for the “what” described in Sandia’s Strategic Plan. I welcome your feedback and look forward to our dialogue about these strategic themes. Please join me as we move forward to implement the plan in the coming year.« less

  7. 78 FR 18674 - Invitation for Public Comment on Draft DOT Research, Development and Technology Strategic Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-27

    ...-0002] Invitation for Public Comment on Draft DOT Research, Development and Technology Strategic Plan... for public comment on its draft strategic plan, U.S. Department of Transportation, Research, Development and Technology Strategic Plan FY 2013-2018. The new five-year strategic plan will guide the...

  8. FY17 Strategic Themes.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leland, Robert W.

    2017-03-01

    I am pleased to present this summary of the FY17 Division 1000 Science and Technology Strategic Plan. As this plan represents a continuation of the work we started last year, the four strategic themes (Mission Engagement, Bold Outcomes, Collaborative Environment, and Safety Imperative) remain the same, along with many of the goals. You will see most of the changes in the actions listed for each goal: We completed some actions, modified others, and added a few new ones. As I’ve stated previously, this is not a strategy to be pursued in tension with the Laboratory strategic plan. The Division 1000more » strategic plan is intended to chart our course as we strive to contribute our very best in service of the greater Laboratory strategy. I welcome your feedback and look forward to our dialogue about these strategic themes. Please join me as we move forward to implement the plan in the coming months.« less

  9. Cascade Distillation Subsystem Development: Progress Toward a Distillation Comparison Test

    NASA Technical Reports Server (NTRS)

    Callahan, M. R.; Lubman, A.; Pickering, Karen D.

    2009-01-01

    Recovery of potable water from wastewater is essential for the success of long-duration manned missions to the Moon and Mars. Honeywell International and a team from NASA Johnson Space Center (JSC) are developing a wastewater processing subsystem that is based on centrifugal vacuum distillation. The wastewater processor, referred to as the Cascade Distillation Subsystem (CDS), utilizes an innovative and efficient multistage thermodynamic process to produce purified water. The rotary centrifugal design of the system also provides gas/liquid phase separation and liquid transport under microgravity conditions. A five-stage subsystem unit has been designed, built, delivered and integrated into the NASA JSC Advanced Water Recovery Systems Development Facility for performance testing. A major test objective of the project is to demonstrate the advancement of the CDS technology from the breadboard level to a subsystem level unit. An initial round of CDS performance testing was completed in fiscal year (FY) 2008. Based on FY08 testing, the system is now in development to support an Exploration Life Support (ELS) Project distillation comparison test expected to begin in early 2009. As part of the project objectives planned for FY09, the system will be reconfigured to support the ELS comparison test. The CDS will then be challenged with a series of human-gene-rated waste streams representative of those anticipated for a lunar outpost. This paper provides a description of the CDS technology, a status of the current project activities, and data on the system s performance to date.

  10. 77 FR 70939 - Magnuson-Stevens Act Provisions; Fisheries of the Northeastern United States; Northeast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-28

    ... operations plans detailing industry-funded monitoring plans, and the supplemental environmental assessment... addenda to FY 2012 NE multispecies sector operations plans and contracts to add additional exemptions from... meeting December 20, 2012. Both of these meetings plan to discuss the sector exemption request to target...

  11. 28. Site Plan: AF Station P67, Fort Custer, Michigan, Plot ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. Site Plan: AF Station P-67, Fort Custer, Michigan, Plot Plan (to accompany FY 1956 project planning report), USACOE, 22 July 1954. - Fort Custer Military Reservation, P-67 Radar Station, .25 mile north of Dickman Road, east of Clark Road, Battle Creek, Calhoun County, MI

  12. Molecular identification of rare FY*Null and FY*X alleles in Caucasian thalassemic family from Sardinia.

    PubMed

    Manfroi, Silvia; Scarcello, Antonio; Pagliaro, Pasqualepaolo

    2015-10-01

    Molecular genetic studies on Duffy blood group antigens have identified mutations underlying rare FY*Null and FY*X alleles. FY*Null has a high frequency in Blacks, especially from sub-Saharan Africa, while its frequency is not defined in Caucasians. FY*X allele, associated with Fy(a-b+w) phenotype, has a frequency of 2-3.5% in Caucasian people while it is absent in Blacks. During the project of extensive blood group genotyping in patients affected by hemoglobinopathies, we identified FY*X/FY*Null and FY*A/FY*Null genotypes in a Caucasian thalassemic family from Sardinia. We speculate on the frequency of FY*X and FY*Null alleles in Caucasian and Black people; further, we focused on the association of FY*X allele with weak Fyb antigen expression on red blood cells and its identification performing high sensitivity serological typing methods or genotyping. Copyright © 2015 Elsevier Ltd. All rights reserved.

  13. DOE FES FY2017 Joint Research Target Fourth Quarter Milestone Report for theNational Spherical Torus Experiment Upgrade.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Soukhanovskii, V. A.

    2017-09-13

    A successful high-performance plasma operation with a radiative divertor has been demonstrated on many tokamak devices, however, significant uncertainty remains in accurately modeling detachment thresholds, and in how detachment depends on divertor geometry. Whereas it was originally planned to perform dedicated divertor experiments on the National Spherical Tokamak Upgrade to address critical detachment and divertor geometry questions for this milestone, the experiments were deferred due to technical difficulties. Instead, existing NSTX divertor data was summarized and re-analyzed where applicable, and additional simulations were performed.

  14. Ecosystem restoration: Chapter 4

    USGS Publications Warehouse

    Cullinane Thomas, Catherine M.; Skrabis, K. E.; Gascoigne, William

    2012-01-01

    The Department of the Interior extensively supports―through its mission, policy, programs, and funding― the study, planning, implementation, and monitoring of ecosystem restoration. This commitment is reflected in the Department's FY2011-2016 Strategic Plan.

  15. Agreement on FY 1990 budget plan

    NASA Astrophysics Data System (ADS)

    The Bush administration has reached agreement with congressional leaders over a thumbnail version of the Fiscal Year 1990 budget. The plan contains few details but could have implications for NASA's Space Station Freedom and other big science projects.Overall, the budget agreement would achieve Gramm-Rudman-Hollings targets for budget deficit reduction without raising taxes, mostly through accounting manipulation and unspecified cuts in social programs. But a supplemental bill that calls for $1.2 billion in new spending for FY 1989 is expected to go to the House floor soon. That measure would violate the new agreement and add to the deficit.

  16. Nevada Test Site-Directed Research, Development, and Demonstration. FY2005 report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lewis, Will

    2006-09-01

    The Nevada Test Site-Directed Research, Development, and Demonstration (SDRD) program completed a very successful year of research and development activities in FY 2005. Fifty new projects were selected for funding this year, and five FY 2004 projects were brought to conclusion. The total funds expended by the SDRD program were $5.4 million, for an average per project cost of just under $100,000. Two external audits of SDRD accounting practices were conducted in FY 2005. Both audits found the program's accounting practices consistent with the requirements of DOE Order 413.2A, and one included the observation that the NTS contractor ''did anmore » exceptional job in planning and executing year-start activities.'' Highlights for the year included: the filing of 18 invention disclosures for intellectual property generated by FY 2005 projects; programmatic adoption of 17 FY 2004 SDRD-developed technologies; participation in the tri-lab Laboratory Directed Research and Development (LDRD) and SDRD program review that was broadly attended by NTS, NNSA, LDRD, and U.S. Department of Homeland Security representatives; peer reviews of all FY 2005 projects; and the successful completion of 55 R&D projects, as presented in this report.« less

  17. 34 CFR 379.53 - What are the minimum performance levels for each compliance indicator?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... employment as follows: (i) No less than 50 percent during fiscal year (FY) 2001. (ii) No less than 51 percent during FY 2002. (iii) No less than 52 percent during FY 2003. (iv) No less than 54 percent during FY 2004. (v) No less than 55 percent during FY 2005 and any year thereafter. (2) Change in earnings. (i...

  18. Independent Auditors Report on the FY 2015 DoD Performance Summary Report of the Funds Obligated for National Drug Control Program Activities

    DTIC Science & Technology

    2016-01-29

    Defense that supports the warfighter; promotes accountability , integrity, and efficiency; advises the Secretary of Defense and Congress; and informs...Activities (Report No. DODIG-2016-042) The Office of National Drug Control Policy (ONDCP) Circular, “ Accounting of Drug Control Funding and...of Certified Public Accountants and in compliance with generally accepted government auditing standards. Those standards required that we plan and

  19. Fiscal year 1980-81 implementation plan in support of technical development and integration of sampling and aggregation procedures. [crop acreage estimation

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The specific objectives of the FY 1980-81 tasks are: (1) further refinements to the weighted aggregation procedure; (2) improved approaches for estimating within-stratum variance; (3) more intensive investigation of alternative sampling strategies such as full-frame sampling strategy, and (4) further developments in regard to a simulated approach for assessing the performance of the overall designed sampling and aggregation system.

  20. FY 1996 solid waste integrated life-cycle forecast characteristics summary. Volumes 1 and 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Templeton, K.J.

    1996-05-23

    For the past six years, a waste volume forecast has been collected annually from onsite and offsite generators that currently ship or are planning to ship solid waste to the Westinghouse Hanford Company`s Central Waste Complex (CWC). This document provides a description of the physical waste forms, hazardous waste constituents, and radionuclides of the waste expected to be shipped to the CWC from 1996 through the remaining life cycle of the Hanford Site (assumed to extend to 2070). In previous years, forecast data has been reported for a 30-year time period; however, the life-cycle approach was adopted this year tomore » maintain consistency with FY 1996 Multi-Year Program Plans. This document is a companion report to two previous reports: the more detailed report on waste volumes, WHC-EP-0900, FY1996 Solid Waste Integrated Life-Cycle Forecast Volume Summary and the report on expected containers, WHC-EP-0903, FY1996 Solid Waste Integrated Life-Cycle Forecast Container Summary. All three documents are based on data gathered during the FY 1995 data call and verified as of January, 1996. These documents are intended to be used in conjunction with other solid waste planning documents as references for short and long-term planning of the WHC Solid Waste Disposal Division`s treatment, storage, and disposal activities over the next several decades. This document focuses on two main characteristics: the physical waste forms and hazardous waste constituents of low-level mixed waste (LLMW) and transuranic waste (both non-mixed and mixed) (TRU(M)). The major generators for each waste category and waste characteristic are also discussed. The characteristics of low-level waste (LLW) are described in Appendix A. In addition, information on radionuclides present in the waste is provided in Appendix B. The FY 1996 forecast data indicate that about 100,900 cubic meters of LLMW and TRU(M) waste is expected to be received at the CWC over the remaining life cycle of the site. Based on ranges provided by the waste generators, this baseline volume could fluctuate between a minimum of about 59,720 cubic meters and a maximum of about 152,170 cubic meters. The range is primarily due to uncertainties associated with the Tank Waste Remediation System (TWRS) program, including uncertainties regarding retrieval of long-length equipment, scheduling, and tank retrieval technologies.« less

  1. Transportation Improvement Program - FY 1997-2000 - Allen County

    DOT National Transportation Integrated Search

    1996-02-01

    The Lima-Allen County Regional Planning Commission (LACRPC), as the Metropolitan Planning Organization (MPO) of the Lima Urbanized Area, in conjunction with the Ohio Department of Transportation (ODOT), is responsible for coordinating transportation ...

  2. Superfund Program Review

    EPA Pesticide Factsheets

    This document presents outcomes of implementing a number of the actions described in the November 2013 Superfund Remedial Program Review (SPR) Action Plan . It also describes ongoing Action Plan efforts and projects future outcomes anticipated in FY 2015

  3. FY 2014 Educational Facilities Master Plan and Amendments to the FY 2013-2018 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2013

    2013-01-01

    In November 1996, the voters of Montgomery County (Maryland) approved by referendum an amendment to the County Charter that changed the County Council's review and approval cycle of the six-year Capital Improvements Program (CIP) from an annual to biennial cycle. The referendum specified that in odd-numbered fiscal years (on-years) the County…

  4. Highlights, FY 2003-05 Biennial Operating Budget for Higher Education.

    ERIC Educational Resources Information Center

    Connecticut State Board of Governors for Higher Education, Hartford.

    This report explains that the General Fund budget: provides $1,232.6 million for the FY 2003-05 biennium; slashes student financial aid funding by 8.6 percent; includes a reduction of 3 percent for Early Retirement Incentive Plan salary savings; represents a budget that is 16.5 percent below requested current services funding, $15.8 million below…

  5. COSAM program overview

    NASA Technical Reports Server (NTRS)

    Stephens, J. R.

    1982-01-01

    The COSAM program for reduction of the use of strategic alloying elements in nickel-based superalloys for gas turbine engines was reviewed. Sources, consumption, and pricing of cobalt, tantalum, columbium, and chromium are surveyed. Research projects in strategic element substitution, advanced processing concepts, and the development of alternate materials (intermetallics and iron-base alloys) are listed and research plans for FY 1983 and FY 1984 summarized.

  6. FY 95 engineering work plan for the design reconstitution implementation action plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bigbee, J.D.

    Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities,more » a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.« less

  7. Environmental restoration and waste management: Five-year plan, Fiscal Years 1992--1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Middleman, L.I.

    1990-06-01

    This document reflects DOE's fulfillment of a major commitment of the Environmental Restoration and Waste Management Five-Year Plan: reorganization to create an Office of Environmental Restoration and Waste Management (EM) responsible for the consolidated environmental management of nuclear-related facilities and sites formerly under the Assistant Secretaries for Defense Programs and Nuclear Energy and the Director of the Office of Energy Research. The purposes of this Plan for FY 1992--1996 are to measure progress in meeting DOE's compliance, cleanup, and waste management agenda; to incorporate a revised and condensed version of the Draft Research Development, Demonstration, Testing, and Evaluation (RDDT E)more » Plan (November 1989) to describe DOE's process for developing the new technologies critically needed to solve its environmental problems; to show DOE's current strategy and planned activities through FY 1996, including reasons for changes required to meet compliance and cleanup commitments; and to increase the involvement of other agencies and the public in DOE's planning.« less

  8. The Austin Community College District Master Plan: FY 2004-2006.

    ERIC Educational Resources Information Center

    Austin Community Coll., TX.

    This Austin Community College (ACC) District Master Plan for 2004-2006 continues ACC's efforts to manage growth and change through a comprehensive planning process. The planning process was coordinated with the ACC Southern Association of Colleges and Schools (SACS) Alternate Self Study. This study addresses the following areas: (1) Fiscal…

  9. Report of Secretary of Defense, Harold Brown, to the Congress on the FY 1982 Budget, FY 1983 Authorization Request and FY 1982-1986 Defense Programs

    DTIC Science & Technology

    1981-01-19

    a " high -low" mix of high performance ...meet the common threat. 86 Considerable progress is being made. Last year, Japanese ships and aircraft performed very capably in a joint naval exercise... high school graduates, however, does not mean that a high school diploma is necessarily a predictor of on-the-job performance in the military.

  10. Site support program plan for ICF Kaiser Hanford Company

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dieterle, S.E.

    1996-09-27

    The Fiscal Year (FY) 1997 Inftastructure Program Site Support Program Plan (SSPP) addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition.

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durham, Robin E.; Becker, James M.

    This document provides a review and status of activities conducted in support of the Fluor Daniel Hanford Company (Fluor), now Mission Support Alliance (MSA), Mitigation Action Plan (MAP) for Project L-325, Electrical Utility Upgrades (2007). Three plantings have been installed on a 4.5-hectare mitigation area to date. This review provides a description and chronology of events, monitoring results, and mitigative actions through fiscal year (FY) 2012. Also provided is a review of the monitoring methods, transect layout, and FY 2012 monitoring activities and results for all planting years. Planting densities and performance criteria stipulated in the MAP were aimed atmore » a desired future condition (DFC) of 10 percent mature sagebrush (Artemisia tridentata ssp wyomingensis) cover. Current recommendations for yielding this DFC are based upon a conceptual model planting of 1000 plants/ha (400/ac) exhibiting a 60-percent survival rate after 5 monitoring years (DOE 2003). Accordingly, a DFC after 5 monitoring years would not be less than 600 plants/ha (240/ac). To date, about 8700 sagebrush plants have been grown and transplanted onto the mitigation site. Harsh site conditions and low seedling survival have resulted in an estimated 489 transplants/ha on the mitigation site, which is 111 plants/ha short of the target DFC. Despite this apparent shortcoming, 71, 91, and 24 percent of the surviving seedlings planted in FY 2007 and FY 2008 and FY 2010, respectively, showed signs of blooming in FY 2012. Blooming status may be a positive indication of future sagebrush recruitment, and is therefore a potential source for reaching the target DFC of 600 plants/ha on this mitigation site over time. Because of the difficulty establishing small transplants on this site, we propose that no additional plantings be considered for this mitigation area and to rely upon the potential recruitment by established seedlings to achieve the mitigation commitment set forth in the MAP of 600 plants/ha.« less

  12. Specification and Preliminary Validation of IAT (Integrated Analysis Techniques) Methods: Executive Summary.

    DTIC Science & Technology

    1985-03-01

    conceptual framwork , and preliminary validation of IAT concepts. Planned work for FY85, including more extensive validation, is also described. 20...Developments: Required Capabilities .... ......... 10 2-1 IAT Conceptual Framework - FY85 (FEO) ..... ........... 11 2-2 Recursive Nature of Decomposition...approach: 1) Identify needs & requirements for IAT. 2) Develop IAT conceptual framework. 3) Validate IAT methods. 4) Develop applications materials. To

  13. Princeton Plasma Physics Laboratory: Annual report, October 1, 1986--September 30, 1987

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1987-01-01

    This report contains papers on the following topics: Principle Parameters Achieved in Experimental Devices (FY87); Tokamak Fusion Test Reactor; Princeton Beta Experiment-Modification; S-1 Spheromak; Current-Drive Experiment; X-Ray Laser Studies; Theoretical Division; Tokamak Modeling; Compact Ignition Tokamak; Engineering Department; Project Planning and Safety Office; Quality Assurance and Reliability; Administrative Operations; and PPPL Patent Invention Disclosures (FY87).

  14. Fuel Thermo-physical Characterization Project. Fiscal Year 2014 Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burkes, Douglas; Casella, Andrew M.; Buck, Edgar C.

    2015-03-15

    The Office of Material Management and Minimization (M3) Reactor Conversion Fuel Thermo-Physical Characterization Project at Pacific Northwest National Laboratory (PNNL) was tasked with using PNNL facilities and processes to receive irradiated low enriched uranium–molybdenum (LEU-Mo) fuel plate samples and perform analysis in support of the M3 Reactor Conversion Program. This work is in support of the M3 Reactor Conversion Fuel Development Pillar that is managed by Idaho National Laboratory. The primary research scope was to determine the thermo-physical properties as a function of temperature and burnup. Work conducted in Fiscal Year (FY) 2014 complemented measurements performed in FY 2013 onmore » four additional irradiated LEU-Mo fuel plate samples. Specifically, the work in FY 2014 investigated the influence of different processing methods on thermal property behavior, the absence of aluminum alloy cladding on thermal property behavior for additional model validation, and the influence of higher operating surface heat flux / more aggressive irradiation conditions on thermal property behavior. The model developed in FY 2013 and refined in FY 2014 to extract thermal properties of the U-Mo alloy from the measurements conducted on an integral fuel plate sample (i.e., U-Mo alloy with a thin Zr coating and clad in AA6061) continues to perform very well. Measurements conducted in FY 2014 on samples irradiated under similar conditions compare well to measurements performed in FY 2013. In general, there is no gross influence of fabrication method on thermal property behavior, although the difference in LEU-Mo foil microstructure does have a noticeable influence on recrystallization of grains during irradiation. Samples irradiated under more aggressive irradiation conditions, e.g., higher surface heat flux, revealed lower thermal conductivity when compared to samples irradiated at moderate surface heat fluxes, with the exception of one sample. This report documents thermal property measurements conducted in FY 2014 and compares results to values obtained from literature and measurements performed in FY 2013, where applicable, along with appropriate discussion.« less

  15. National Aeronautics and Space Administration FY 02 Revised Final Annual Performance Plan

    DTIC Science & Technology

    2002-01-01

    years ago led to the extinction of dinosaurs and cleared the way for the rise of mammals. An even greater impact more than 200 million years ago led...extinction of dinosaurs and cleared the way for the rise of mammals. An even greater impact more than 200 million years ago led to the extinction...cellular biotechnology. • Prepare ISS research investigations in protein crystallization and three-dimensional tissue culture. PP BPR-6 Public

  16. Defense switched network technology and experiments program

    NASA Astrophysics Data System (ADS)

    Weinstein, C. J.

    1983-09-01

    This report documents work performed during FY 1983 on the DCA-sponsored Defense Switched Network Technology and Experiments Program. The areas of work reported are: (1) development of routing algorithms for application in the Defense Switched Network (DSN); (2) instrumentation and integration of the Experimental Integrated Switched Network (EISN) test facility; (3) development and test of data communication techniques using DoD-standard data protocols in an integrated voice/data network; and (4) EISN system coordination and experiment planning.

  17. Civil Space Technology Initiative: a First Step

    NASA Technical Reports Server (NTRS)

    1988-01-01

    This is the first published overview of OAST's focused program, the Civil Space Technology Initiative, (CSTI) which started in FY88. This publication describes the goals, technical approach, current status, and plans for CSTI. Periodic updates are planned.

  18. FY 2013 INL SITE SUSTAINABILITY PLAN WITH THE FY 2012 ANNUAL REPORT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ernest L. Fossum; Steve A. Birrer

    2012-12-01

    It is the policy of the Department of Energy (DOE) that sustainable energy and transportation fuels management will be integrated into DOE operations to meet obligations under Executive Order (EO) 13423 "Strengthening Federal Environmental, Energy, and Transportation Management," the Instructions for Implementation of EO 13423, as well as Guidance Documents issued in accordance thereto and any modifcations or amendments that may be issued from time to time. In furtherance of this obligation, DOE established strategic performance-based energy and transportation fuels goals and strategies through the Transformational Energy Action Management (TEAM) Initiative, which were incorporated into DOE Order 430.2B "Departmental Energy,more » Renewable energy, and Transportation Management" and were also identified in DOE Order 450.1A, "Environmental Protection Program." These goals and accompanying strategies are to be implemented by DOE sites through the integration of energy and transportation fuels management into site Environmental Management Systems (EMS).« less

  19. The Nuclear Energy Advanced Modeling and Simulation Enabling Computational Technologies FY09 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Diachin, L F; Garaizar, F X; Henson, V E

    2009-10-12

    In this document we report on the status of the Nuclear Energy Advanced Modeling and Simulation (NEAMS) Enabling Computational Technologies (ECT) effort. In particular, we provide the context for ECT In the broader NEAMS program and describe the three pillars of the ECT effort, namely, (1) tools and libraries, (2) software quality assurance, and (3) computational facility (computers, storage, etc) needs. We report on our FY09 deliverables to determine the needs of the integrated performance and safety codes (IPSCs) in these three areas and lay out the general plan for software quality assurance to meet the requirements of DOE andmore » the DOE Advanced Fuel Cycle Initiative (AFCI). We conclude with a brief description of our interactions with the Idaho National Laboratory computer center to determine what is needed to expand their role as a NEAMS user facility.« less

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    We conducted physics experiments: record normalized {Beta} = 4.9 achieved in VH-mode, {Beta} limits of ITER-like configurations evaluated, FWCD commissioning. The tokamak vessel was opened to atmosphere for six weeks and a number of key diagnostics for understanding the divertor were installed. The DIII-D Advisory Committee met in January to review the DIII-D program and plan. They commended us for recent progress and supported the vanadium divertor design. The U.S./Japan DIII-D steering committee met and recommended extending the agreement to the year 2000. The field work proposal for FY 96/97 was presented in Washington on March 29, 1995. A reviewmore » of the DIII-D plan to install vanadium structural components as part of the new radiative divertor modification was held in Washington 31, 1995 and the panel endorsed the plans. Preliminary plans were developed with PPPL for collaborations in FY96,« less

  1. Exploratory Research and Development Fund, FY 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-05-01

    The Lawrence Berkeley Laboratory Exploratory R D Fund FY 1990 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the projects supported and summarizes their accomplishments. It constitutes a part of an Exploratory R D Fund (ERF) planning and documentation process that includes an annual planning cycle, projection selection, implementation, and review. The research areas covered in this report are: Accelerator and fusion research; applied science; cell and molecular biology; chemical biodynamics; chemical sciences; earth sciences; engineering; information and computing sciences; materials sciences; nuclear science; physics and research medicinemore » and radiation biophysics.« less

  2. Ocean Observations with EOS/MODIS: Algorithm Development and Post Launch Studies

    NASA Technical Reports Server (NTRS)

    Gordon, Howard R.; Conboy, Barbara (Technical Monitor)

    1999-01-01

    This separation has been logical thus far; however, as launch of AM-1 approaches, it must be recognized that many of these activities will shift emphasis from algorithm development to validation. For example, the second, third, and fifth bullets will become almost totally validation-focussed activities in the post-launch era, providing the core of our experimental validation effort. Work under the first bullet will continue into the post-launch time frame, driven in part by algorithm deficiencies revealed as a result of validation activities. Prior to the start of the 1999 fiscal year (FY99) we were requested to prepare a brief plan for our FY99 activities. This plan is included as Appendix 1. The present report describes the progress made on our planned activities.

  3. Field test designs for the evaluation of vessel operators' use of and confidence in various aids to navigation

    DOT National Transportation Integrated Search

    1995-12-01

    Development Center in evaluating current Coast Guard policies and development plans for : Waterways Management, a "Waterways Management Research and Planning" task plan was : established as Task Area A in FY '94. The purpose of this task area is to d...

  4. 78 FR 5481 - Quagga Mussel Strategic Planning Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-25

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-HQ-FHC-2013-N008; 94140-1341-0000-N5] Quagga Mussel Strategic Planning Meeting AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of meeting. SUMMARY: This notice announces a meeting to gather information for planning an FY13 strategy to...

  5. Strategic planning applied to quality in asthma management for children.

    PubMed

    Goonan, K J; Healy, J M; Jordan, H S; Zazzali, J L; Horowitz, M

    1993-01-01

    This strategic plan translates the HCHP vision statement into a working plan for one major clinical condition--asthma in children. It is a working plan for clinicians and managers across specialties and levels. The results of the projects will improve in a measurable way significant clinical practice and outcomes, in keeping with the FY 1993 strategic goals.

  6. Annual Plan for the EPA and CSB - FY 2015

    EPA Pesticide Factsheets

    This plan describes how the OIG will achieve its statutory mission of promoting economy, efficiency, effectiveness and integrity relating to the programs and operations of the EPA and the U.S. Chemical Safety and Hazard Investigation Board.

  7. Annual Plan for the EPA and CSB - FY 2016

    EPA Pesticide Factsheets

    This plan describes how the OIG will achieve its statutory mission of promoting economy, efficiency, effectiveness and integrity relating to the programs and operations of the EPA and the U.S. Chemical Safety and Hazard Investigation Board.

  8. FHWA planning and environmental linkages annual report fiscal year 2011.

    DOT National Transportation Integrated Search

    2012-01-20

    This report highlights the Federal Highway Administration's (FHWA) Planning and Environment Linkages (PEL) program activities for Fiscal Year 2011 (FY11). The PEL program's purpose is to provide transportation agencies with tools and resources to int...

  9. FY 1998 Proposed Rail Improvement Program

    DOT National Transportation Integrated Search

    1997-01-01

    The Illinois Department of Transportation has, in the past, published its Rail program yearly, and its Rail plan as needs dictate. The department has combined : both documents into one. This new document, as with those Programs and Plans : that have ...

  10. Highlands County transit development plan : (FY 2003/04-2007/08)

    DOT National Transportation Integrated Search

    2002-07-01

    To plan for a public transportation system, it is necessary to gain an understanding of the environment within which the system is operating. The following aspects are examined in this report: Demographics; public involvement; existing transportation...

  11. Five-Year Research and Development Plan, Fiscal Years 2008-2013

    DTIC Science & Technology

    2008-08-01

    protect our interior 1.l.1 Deploy a mix of infrastructure, technology, and personnel on the Southwest border to ensure all illegal activity along...requirements into a systems model. FY 2009: • Review the System of Systems model and ensure it correctly addresses SBI requirements. FY 2010... on a ship). This security architecture provides the framework within which DHS will incorporate their near-term CSD and future container security

  12. FY17 NIF Performance Quad Campaign: laser performance results and conclusions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Di Nicola, J. M.; Mennerat, G.; Widmayer, G.

    The FY17 NIF Performance Quad Campaign exercised a single quad of NIF (Q45T) at elevated energy to assess the impact of recent improvements to the infrared (1ω) and ultraviolet (3ω) section of the laser on integrated performance.

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farren Hunt

    Idaho National Laboratory (INL) performed an Annual Effectiveness Review of the Integrated Safety Management System (ISMS), per 48 Code of Federal Regulations (CFR) 970.5223 1, “Integration of Environment, Safety and Health into Work Planning and Execution.” The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and identified target areas for focused improvements and assessments for fiscal year (FY) 2013. Results of the FY 2012 annual effectiveness review demonstrated that the INL’s ISMS program was significantly strengthened. Actions implemented by the INL demonstrate that the overall Integrated Safety Management System is sound and ensures safemore » and successful performance of work while protecting workers, the public, and environment. This report also provides several opportunities for improvement that will help further strengthen the ISM Program and the pursuit of safety excellence. Demonstrated leadership and commitment, continued surveillance, and dedicated resources have been instrumental in maturing a sound ISMS program. Based upon interviews with personnel, reviews of assurance activities, and analysis of ISMS process implementation, this effectiveness review concludes that ISM is institutionalized and is “Effective”.« less

  14. Annual Plan for the EPA and CSB - FY 2017

    EPA Pesticide Factsheets

    Dec 19, 2016. This plan describes how the OIG will achieve its statutory mission of promoting economy, efficiency, effectiveness and integrity relating to the programs and operations of the EPA and the U.S. Chemical Safety and Hazard Investigation Board.

  15. Notification: Audit of EPA’s Eliminated Programs

    EPA Pesticide Factsheets

    Project #OA-FY16-0181, June 2, 2016. The EPA OIG plans to begin the preliminary research of the EPA's eliminated programs identified in the agency’s 2015 and 2016 budget submissions for congressional justification as well as plans for future years.

  16. Ames Research Center FY 2000 Implementation Plan: Leading Technology into the New Millennium

    NASA Technical Reports Server (NTRS)

    2000-01-01

    This document presents the implementation plan for Ames Research Center (ARC) within the overall framework of the NASA Strategic Plan. It describes how ARC intends to implement its Center of Excellence responsibilities, Agency assigned missions, Agency and Enterprise lead programs, and other roles in support of NASA's vision and mission. All Federal agencies are required by the 1993 Government Performance and Results Act to implement a long-term strategic planning process that includes measurable outcomes and strict accountability. At NASA, this planning process is shaped by the Space Act of 1958, annual appropriations, and other external mandates, as well as by customer requirements. The resulting Strategic Plan sets the overall architecture for what we do, identifies who our customers are, and directs where we are going and why. The Strategic Plan is the basis upon which decisions regarding program implementation and resource deployment are made. Whereas the strategic planning process examines the long-term direction of the organization and identifies a specific set of goals, the implementation planning process examines the detailed performance of the organization and allocates resources toward meeting these goals. It is the purpose of this implementation document to provide the connection between the NASA Strategic Plan and the specific programs and support functions that ARC employees perform. This connection flows from the NASA Strategic Plan, through the various Strategic Enterprise plans to the ARC Center of Excellence, primary missions, Lead Center programs, program support responsibilities, and ultimately, to the role of the individual ARC employee.

  17. Research and Development Program Plan for the Center for Engineering Systems Advanced Research (CESAR)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weisbin, C.R.; Barhen, J.; Hamel, W.R.

    1987-01-01

    A general framework is provided for more detailed planning on an annual basis, both for DOE and for other sponsoring organizations. The charter for the overall intelligent machine research effort is presented along with programmatic and technological goals. A research implementation plan is provided through the FY 1989 horizon.

  18. Cementitious Barriers Partnership FY2013 End-Year Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Flach, G. P.; Langton, C. A.; Burns, H. H.

    2013-11-01

    In FY2013, the Cementitious Barriers Partnership (CBP) demonstrated continued tangible progress toward fulfilling the objective of developing a set of software tools to improve understanding and prediction of the long-term structural, hydraulic and chemical performance of cementitious barriers used in nuclear applications. In November 2012, the CBP released “Version 1.0” of the CBP Software Toolbox, a suite of software for simulating reactive transport in cementitious materials and important degradation phenomena. In addition, the CBP completed development of new software for the “Version 2.0” Toolbox to be released in early FY2014 and demonstrated use of the Version 1.0 Toolbox on DOEmore » applications. The current primary software components in both Versions 1.0 and 2.0 are LeachXS/ORCHESTRA, STADIUM, and a GoldSim interface for probabilistic analysis of selected degradation scenarios. The CBP Software Toolbox Version 1.0 supports analysis of external sulfate attack (including damage mechanics), carbonation, and primary constituent leaching. Version 2.0 includes the additional analysis of chloride attack and dual regime flow and contaminant migration in fractured and non-fractured cementitious material. The LeachXS component embodies an extensive material property measurements database along with chemical speciation and reactive mass transport simulation cases with emphasis on leaching of major, trace and radionuclide constituents from cementitious materials used in DOE facilities, such as Saltstone (Savannah River) and Cast Stone (Hanford), tank closure grouts, and barrier concretes. STADIUM focuses on the physical and structural service life of materials and components based on chemical speciation and reactive mass transport of major cement constituents and aggressive species (e.g., chloride, sulfate, etc.). THAMES is a planned future CBP Toolbox component focused on simulation of the microstructure of cementitious materials and calculation of resultant hydraulic and constituent mass transfer parameters needed in modeling. Two CBP software demonstrations were conducted in FY2013, one to support the Saltstone Disposal Facility (SDF) at SRS and the other on a representative Hanford high-level waste tank. The CBP Toolbox demonstration on the SDF provided analysis on the most probable degradation mechanisms to the cementitious vault enclosure caused by sulfate and carbonation ingress. This analysis was documented and resulted in the issuance of a SDF Performance Assessment Special Analysis by Liquid Waste Operations this fiscal year. The two new software tools supporting chloride attack and dual-regime flow will provide additional degradation tools to better evaluate performance of DOE and commercial cementitious barriers. The CBP SRNL experimental program produced two patent applications and field data that will be used in the development and calibration of CBP software tools being developed in FY2014. The CBP software and simulation tools varies from other efforts in that all the tools are based upon specific and relevant experimental research of cementitious materials utilized in DOE applications. The CBP FY2013 program involved continuing research to improve and enhance the simulation tools as well as developing new tools that model other key degradation phenomena not addressed in Version 1.0. Also efforts to continue to verify the various simulation tools through laboratory experiments and analysis of field specimens are ongoing and will continue into FY2014 to quantify and reduce the uncertainty associated with performance assessments. This end-year report summarizes FY2013 software development efforts and the various experimental programs that are providing data for calibration and validation of the CBP developed software.« less

  19. 2014 Fermilab Laboratory Directoed Research & Development Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    W. Wester

    After initiation by the Fermilab Laboratory Director, a team from the senior Laboratory leadership and a Laboratory Directed Research and Development (LDRD) Advisory Committee developed an implementation plan for LDRD at Fermilab for the first time. This implementation was captured in the approved Fermilab 2014 LDRD Program Plan and followed directions and guidance from the Department of Energy (DOE) order, DOE O 413.2B, a “Roles, Responsibilities, and Guidelines, …” document, and examples of best practices at other DOE Office of Science Laboratories. At Fermilab, a FY14 midyear Call for Proposals was issued. A LDRD Selection Committee evaluated those proposals thatmore » were received and provided a recommendation to the Laboratory Director who approved seven LDRD projects. This Annual Report focuses on the status of those seven projects and provides an overview of the current status of LDRD at Fermilab. The seven FY14 LDRD approved projects had a date of initiation late in FY14 such that this report reflects approximately six months of effort approximately through January 2015. The progress of these seven projects, the subsequent award of six additional new projects beginning in FY15, and preparations for the issuance of the FY16 Call for Proposals indicates that LDRD is now integrated into the overall annual program at Fermilab. All indications are that LDRD is improving the scientific and technical vitality of the Laboratory and providing new, novel, or cutting edge projects carried out at the forefront of science and technology and aligned with the mission and strategic visions of Fermilab and the Department of Energy.« less

  20. 2015 Fermilab Laboratory Directed Research & Development Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wester, W.

    2016-05-26

    The Fermi National Accelerator Laboratory (FNAL) is conducting a Laboratory Directed Research and Development (LDRD) program. Fiscal year 2015 represents the first full year of LDRD at Fermilab and includes seven projects approved mid-year in FY14 and six projects approved in FY15. One of the seven original projects has been completed just after the beginning of FY15. The implementation of LDRD at Fermilab is captured in the approved Fermilab 2015 LDRD Annual Program Plan. In FY15, the LDRD program represents 0.64% of Laboratory funding. The scope of the LDRD program at Fermilab will be established over the next couple ofmore » years where a portfolio of about 20 on-going projects representing approximately between 1% and 1.5% of the Laboratory funding is anticipated. This Annual Report focuses on the status of the current projects and provides an overview of the current status of LDRD at Fermilab.« less

  1. Information Technology Resources Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-04-01

    The Information Technology Resources Assessment (ITRA) is being published as a companion document to the Department of Energy (DOE) FY 1994--FY 1998 Information Resources Management Long-Range Plan. This document represents a collaborative effort between the Office of Information Resources Management and the Office of Energy Research that was undertaken to achieve, in part, the Technology Strategic Objective of IRM Vision 21. An integral part of this objective, technology forecasting provides an understanding of the information technology horizon and presents a perspective and focus on technologies of particular interest to DOE program activities. Specifically, this document provides site planners with anmore » overview of the status and use of new information technology for their planning consideration.« less

  2. Exploratory Research and Development Fund, FY 1990. Report on Lawrence Berkeley Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-05-01

    The Lawrence Berkeley Laboratory Exploratory R&D Fund FY 1990 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the projects supported and summarizes their accomplishments. It constitutes a part of an Exploratory R&D Fund (ERF) planning and documentation process that includes an annual planning cycle, projection selection, implementation, and review. The research areas covered in this report are: Accelerator and fusion research; applied science; cell and molecular biology; chemical biodynamics; chemical sciences; earth sciences; engineering; information and computing sciences; materials sciences; nuclear science; physics and research medicine and radiationmore » biophysics.« less

  3. Progress Towards providing Heat-Shield for Extreme Entry Environment Technology (HEEET) for Venus and other New Froniters Missions

    NASA Technical Reports Server (NTRS)

    Venkatapathy, Ethiraj; Ellerby, Don; Gage, Peter

    2017-01-01

    Heat-shield for Extreme Entry Environment Technology (HEEET) has been in development since 2014 with the goal of enabling missions to Venus, Saturn and other high-speed sample return missions. It is offered as a new technology and incentivized for mission use in the New Frontiers 4 AO by NASA. The current plans are to mature the technology to TRL 6 by FY18. The HEEET Team has been working closely with multiple NF-4 proposals to Venus, Saturn and has been supporting recent Ice-Giants mission studies. This presentation will provide progress made to date and the plans for development in FY18.

  4. Area Handbook Series. India: A Country Study.

    DTIC Science & Technology

    1985-01-01

    and be- came effective for the period FY 1980-84. Development expendi- tures in the sixth plan were to be nearly Rs1. 7 trillion (in FY 1979 294 II...to participate more effectively in the financial needs of the development process, and to cease to be subject to monopolization by the vested interests...collection developed . Several forms can be distinguished according to their effect on the relations between farmers, land- owners, and government. The

  5. FY98 Aero Propulsion & Power Technology Area Plan.

    DTIC Science & Technology

    1997-11-01

    controlled area turbine nozzle (HPT & LPT) - second quarter FY98 a Fabrication/test of gamma titanium aluminide exhaust flap/liner - third quarter...both a commercial business jet and an unmanned air vehicle (Dark Star). - "Super-cooled" turbine blade designs permit 3000 F higher gas temperature for...increased thrust, or 30% reduction in blade cooling air for reduced fuel consumption, or two-to four- fold increase in turbine blade life - all at a

  6. Economics and Security: Resourcing National Priorities

    DTIC Science & Technology

    2010-05-21

    passed two laws in 2005 and 2008 basically endorsing the Constellation pro - gram and the Bush administration’s future plans for NASA. Currently, Con ...10 percent. The pro - posed Fiscal Year (FY) 2011 federal budget is $3.8 trillion with a deficit for this year of $1.6 trillion, about 11 percent of...Quadrennial Defense Review examines Department of Defense strat- egies and priorities and rebalances strategies, capabilities, and forces. The pro - posed FY

  7. Summary of the NASA/MSFC FY-79 Severe Storm and Local Weather research review. [cloud physics, atmospheric electricity, and mesoscale/storm dynamics reserach

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Significant acomplishments, current focus of work, plans for FY-80, and recommendations for new research are outlined for 36 research projects proposed for technical monitoring by the Atmospheric Sciences Division at Marshall Space Flight Center. Topics of the investigations, which were reviewed at a two-day meeting, relate to cloud physics, atmospheric electricity, and mesoscale/storm dynamics.

  8. Insensitive Munitions Advanced Development FY 89 Program Plan

    DTIC Science & Technology

    1989-01-01

    reduced vulnerability. The development of castable, moderately energetic explosives such as PBXN - 106 , PBXN -107, and PBX(AF)-108 I for fragment...PROGRESS: Following the successful processing of PBXN - 106 and PBXN -109 in a 37mm Werner Pfleiderer continuous mixer/extruder under contract (ICT/FRG) within...the FY86/87 timeframe, the installation of a similar setup was completed at NSWC and the first live mix ( PBXN - 106 ) was processed during the second

  9. Afghanistan: Narcotics and U.S. Policy

    DTIC Science & Technology

    2009-06-18

    Defense Appropriation P.L. 110-116 FY2008 Bridge Fund P.L. 110-161 (Division L ) FY2008 Supplemental P.L. 110-252 (Title IX, Chapter 1) Total...Moreau and Sami Yousafzai, with Donatella Lorch, “Flowers of Destruction,” Newsweek, July 14, 2003; Andrew North, “Warlord Tells Police Chief to Go...Gen. Walter L . Sharp, Director of Strategic Plans (J-5), Before the House International Relations Committee, September 23, 2004. 81 House of Commons

  10. Measuring Efficiency and Tradeoffs in Attainment of EEO Goals.

    DTIC Science & Technology

    1982-02-01

    in FY78 and FY79. i.e., T9tese goals Are based on undifferentiated Civilian Labor Force (CLF) ratios required for reporting by the Equal Employment...Lewis and R.J. Niehaus, "Design and Development of Equal Employment Opportunity Human Resources Planning Models," NPDRC TR79--141 (San Diego: Navy...Approach to Analysis of Tradeoffs Among Household Ptoduction Outputs," American Statistical Association 1979 Proceedings of the Social Statistics Section

  11. Bibliography of Unclassified Reports: FY 1983.

    DTIC Science & Technology

    1983-11-01

    selected automobile and motorcyclemagazines with a high proportion of readership in this age group. The strategy was evaluated by comparing the number of...climate of the human resource management ( HRM ) survey in compliance with the FY82 Navy Affirmative Action Plan. The most recent 1-year data base (I July...1980 to 30 June 1981) of HRM survey responses was used, yielding a sample of 35,690 personnel. The responses of whites and blacks, whites and

  12. Impact of robotic operative efficiency on profitability.

    PubMed

    Geller, Elizabeth J; Matthews, Catherine A

    2013-07-01

    We sought to determine the impact of robotic operative efficiency on profitability and assess the impact of secondary variables. Financial data were collected for all robotic cases performed for fiscal years 2010 (FY10) and 2011 (FY11) at University of North Carolina at Chapel Hill, and included 9 surgical subspecialties. Profitability was defined as a positive operating income. From July 2009 through June 2011, 1295 robotic cases were performed. Robotic surgery was profitable in both fiscal years, with an operating income of $386,735 in FY10 and $822,996 in FY11. In FY10, urogynecology and pediatric surgery were the only nonprofitable subspecialties. In FY11, all subspecialties were profitable. Profitability was associated with case time, payor mix, and procedure type (all P < .05). Urogynecology case time decreased from 220-179 minutes (P = .012) and pediatric surgery from 418-258 minutes (P = .019). Robotic operative efficiency has a large impact on overall profitability regardless of surgical specialty. Copyright © 2013 Mosby, Inc. All rights reserved.

  13. Startup Notification Report 3rd Quarter FY17.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Freeman, Roger D.; Petti, Jason P.

    2017-11-01

    This activity is being revised based on the November 2016 Project Plan and Installation Plan. These documents were developed and issued due to a change in the design responsibilities, assigned project personnel and the change in the installation of the RCS subsystems.

  14. First example of an FY*01 allele associated with weakened expression of Fya on red blood cells.

    PubMed

    Arndt, Patricia A; Horn, Trina; Keller, Jessica A; Heri, Suzanne M; Keller, Margaret A

    2015-01-01

    Duffy antigens are important in immunohematology. the reference allele for the Duffy gene (FY) is FY*02, which encodes Fy(b). An A>G single nucleotide polymorphism (SNP) at coding nucleotide (c.) 125 in exon 2 defines the FY*01 allele, which encodes the antithetical Fy(a). A C>T SNP at c.265 in the FY*02 allele is associated with weakening of Fy(b) expression on red blood cells (R BCs) (called Fy(x)). until recently, this latter change had not been described on a FY*01 background allele. Phenotype-matched units were desired for a multi-transfused Vietnamese fetus with α-thalassemia. Genotyping of the fetus using a microarray assay that interrogates three SNPs (c.1-67, c.125, and c.265) in FY yielded indeterminate results for the predicted Duffy phenotype. Genomic sequencing of FY exon 2 showed that the fetal sample had one wild-type FY*01 allele and one new FY*01 allele with the c.265C>T SNP, which until recently had only been found on the FY*02 allele. Genotyping performed on samples from the proband's parents indicated that the father had the same FY genotype as the fetus. Flow cytometry, which has been previously demonstrated as a useful method to study antigen strength on cells, was used to determine if this new FY*01 allele was associated with reduced Fy(a) expression on the father's RBCs. Median fluorescence intensity of the father's RBCs (after incubation with anti-FY(a) and fluorescein-labeled anti-IgG) was similar to known FY*01 heterozygotes. and significantly weaker than known FY*01 homozygotes. In conclusion, the fetus and father both had one normal FY*01 allele and one new FY*01W.01, is associated with weakened expression of Fy(a) on RBCs.

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.

    This annual report is a deliverable for fiscal year 2006 (FY06) for Project 2002-077-00, Facilitation of the Estuary/Ocean Subgroup (EOS). The EOS is part of the research, monitoring, and evaluation (RME) effort the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to the 2000 and 2004 Biological Opinions on operation of the Federal Columbia River Power System. The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates implementation of the Estuary RME Plan. In FY06, EOS project accomplishments included: 1) subgroup meetings; 2)more » participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; 3) project management via the project tracking system, PISCES; 4) quarterly project status reports; and 5) a major revision to the Estuary RME Plan (new version May 2006) based on comments by EOS members, the Independent Scientific Review Panel, and other reviewers. In the context of uncertainty about the direction of the federal RME due to litigation on the FCRPS Biological Opinion, FY06 activities for the EOS project resulted in expanded substantive coordination with other regional RME forums, project tracking infrastructure, and a new version of the Estuary RME Plan.« less

  16. Battelle Energy Alliance, LLC (BEA) 2016 Self-Assessment Report for Idaho National Laboratory (INL)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alvarez, Juan

    This report provides Battelle Energy Alliance’s (BEA) self-assessment of performance for the period of October 1, 2015, through September 30, 2016, as evaluated against the goals, performance objectives, and notable outcomes defined in the Fiscal Year (FY) 2016 Performance Evaluation and Measurement Plan (PEMP). BEA took into consideration and consolidated all input provided from internal and external sources (e.g., Contractor Assurance System [CAS], program and customer feedback, external and independent reviews, and Department of Energy [DOE] Idaho Operations Office [ID] quarterly PEMP reports and Quarterly Evaluation Reports). The overall performance of BEA during this rating period was self-assessed as “Excellent,”more » exceeding expectations of performance in Goal 1.0, “Efficient and Effective Mission Accomplishment”; Goal 2.0, “Efficient and Effective Stewardship and Operation of Research Facilities”; and Goal 3.0, “Sound and Competent Leadership and Stewardship of the Laboratory.” BEA met or exceeded expectations for Mission Support Goals 4.0 through 7.0 assessing a final multiplier of 1.0. Table 1 documents BEA’s assessment of performance to the goals and individual performance objectives. Table 2 documents completion of the notable outcomes. A more-detailed assessment of performance for each individual performance objective is documented in the closeout reports (see the PEMP reporting system). Table 3 includes an update to “Performance Challenges” as reported in the FY 2015 Self-Assessment Report.« less

  17. Affordable Development and Demonstration of a Small NTR Engine and Stage: How Small is Big Enough?

    NASA Technical Reports Server (NTRS)

    Borowski, S. K.; Sefcik, R. J.; Fittje, J. E.; McCurdy, D. R.; Qualls, A. L.; Schnitzler, B. G.; Werner, J.; Weitzberg, A.; Joyner, C. R.

    2015-01-01

    In FY11, NASA formulated a plan for Nuclear Thermal Propulsion (NTP) development that included Foundational Technology Development followed by system-level Technology Demonstrations The ongoing NTP project, funded by NASAs Advanced Exploration Systems (AES) program, is focused on Foundational Technology Development and includes 5 key task activities:(1) Fuel element fabrication and non-nuclear validation testing of heritage fuel options;(2) Engine conceptual design;(3) Mission analysis and engine requirements definition;(4) Identification of affordable options for ground testing; and(5) Formulation of an affordable and sustainable NTP development program Performance parameters for Point of Departure designs for a small criticality-limited and full size 25 klbf-class engine were developed during FYs 13-14 using heritage fuel element designs for both RoverNERVA Graphite Composite (GC) and Ceramic Metal (Cermet) fuel forms To focus the fuel development effort and maximize use of its resources, the AES program decided, in FY14, that a leader-follower down selection between GC and cermet fuel was required An Independent Review Panel (IRP) was convened by NASA and tasked with reviewing the available fuel data and making a recommendation to NASA. In February 2015, the IRP recommended and the AES program endorsed GC as the leader fuel In FY14, a preliminary development schedule DDTE plan was produced by GRC, DOE industry for the AES program. Assumptions, considerations and key task activities are presented here Two small (7.5 and 16.5 klbf) engine sizes were considered for ground and flight technology demonstration within a 10-year timeframe; their ability to support future human exploration missions was also examined and a recommendation on a preferred size is provided.

  18. Contracts and Management Services FY 1996 Site Support Program Plan: WBS 6.10.14. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Knoll, J.M. Jr.

    1995-09-01

    This is the Contracts and Management Services site support program plan for the US DOE Hanford site. The topics addressed in the program plan include a mission statement, program objectives, planning assumptions, program constraints, work breakdown structure, milestone list, milestone description sheets, and activity detail including cost accounting narrative summary, approved funding budget, and activity detailed description.

  19. State/federal interaction of LANDSAT system and related technical assistance

    NASA Technical Reports Server (NTRS)

    Tesser, P. A.

    1981-01-01

    The history of state involvement in LANDSAT systems planning and related efforts is described. Currently 16 states have visual LANDSAT capabilities and 10 others are planning on developing such capabilities. The federal government's future plans for the LANDSAT system, the impacts of recent budget decisions on the systems, and the FY 82 budget process are examined.

  20. 75 FR 30100 - FY 2010 Discretionary Livability Funding Opportunity: Alternatives Analysis Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-28

    ..., Alternatives Analysis Program, Office of Planning and Environment, by phone at (202) 493-0512 or by e-mail at... transportation planning process which includes: (1) An assessment of a wide range of public transportation... descriptions of the documents produced, can be found on FTA's Web site at http://www.fta.dot.gov/planning...

  1. Child Care and Development Fund: Report of State Plans FY 2002-2003.

    ERIC Educational Resources Information Center

    Administration on Children, Youth, and Families (DHHS), Washington, DC. Child Care Bureau.

    The Personal Responsibility and Work Opportunity Reconciliation Act requires each state to submit a biennial plan to implement the Child Care and Development Fund (CCDF). This report summarizes information in the biennial plans submitted for the period October 1, 2001 to September 30, 2003. The analysis includes information from 50 states, the…

  2. 75 FR 18113 - Magnuson-Stevens Act Provisions; Fisheries of the Northeastern United States; Northeast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... final operations plan, contract, and environmental assessment (EA), and the Final Regulatory Flexibility... fish in a given FY, it must submit an operations plan, sector contract, and EA to NMFS by September 1... National Environmental Policy Act (NEPA), an EA was prepared for each operations plan. All sector EAs are...

  3. ORD GROUND WATER RESEARCH PLAN: STRATEGY FOR FY 1991 AND BEYOND

    EPA Science Inventory

    This document describes a ground water research plan for EPA's Office of Research and Development (ORD). The ground water research program is carried out by ORD's Office of Environmental Processes and Effects Research (OEPER), the Office of Modeling, Monitoring Systems, and Quali...

  4. 76 FR 13353 - Department of Commerce FY 2011-2016 Strategic Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-11

    ... scorecard. A balanced scorecard ``balances'' or equally emphasizes programmatic and management objectives... senior leadership to develop a balanced scorecard to deploy and execute this Strategic Plan. The Secretary directed a balanced scorecard approach to establish and maintain focus on the Department's top...

  5. Wood-Washington-Wirt Interstate Planning Commission : transportation improvement program, FY 1997-2000

    DOT National Transportation Integrated Search

    2001-01-01

    The Transportation Improvement Program, or TIP, required under the provisions of Title 23, U. S. C., and the Federal Transit Act, as amended through June 1992, includes projects consistent with the Long Range Transportation Plan for the study area. T...

  6. Detection of antibodies reacting with the antithetical duffy blood group antigens Fy(a) and Fy(b) using recombinant fusion proteins containing the duffy extracellular domain.

    PubMed

    Sheffield, William P; Bhakta, Varsha; Branch, Donald R; Denomme, Gregory A

    2006-12-01

    Detecting blood group-specific antibodies in patient sera is essential to the management of blood transfusions or pregnancies. We produced the antithetical forms of the 65 amino acid extracellular domain (ECD) of the Duffy (Fy) blood group protein fused to glutathione sulfotransferase (GST): GST-Fy(a); and GST-Fy(b), differing only in Gly or Asp at position 44, respectively. The purified recombinant proteins were recognized more effectively by reference polyclonal or monoclonal antibodies than the antithetical Fy specificity by either ELISA or immunoblotting. Combined immunoblot and ELISA tests performed at 1:200 dilutions of sera using the recombinant proteins gave results in agreement with undiluted sera and agglutination for 17/19 alloimmunized patients. At 1:200, agglutination detected anti-Fy(a) or anti-Fy(b) in only three of 12 samples that were positive by ELISA. Recombinant ECD-Fy proteins are suitable and sensitive reagents for the detection of anti-Fy that use technology amenable to automation and/or miniaturization and avoid the need for intact red cells.

  7. Department of Defense Data Model, Version 1, Fy 1998, Volume 6.

    DTIC Science & Technology

    1998-05-31

    Definition: A REQUIREMENT TO WITHHOLD PAYMENT ON A SPECIFIC CONTRACT. (5104) (1) (A) 138 Entity Report DOD Data Model VI FY98 Attribute Names...424 Entity Report DOD Data Model VI FY98 Entity Name: PAYMENT -MEANS-FINANCIAL-INSTITUTION-ACCOUNT Definition: THE ASSOCIATION OF A FINANCIAL...A) 453 Entity Report DOD Data Model VI FY98 Definition: PETITION FOR PAYMENT PRIOR TO PERFORMANCE BY A PERSONNEL-RESOURCE. Attribute Names

  8. Fuel Cycle Research and Development Accident Tolerant Fuels Series 1 (ATF-1) Irradiation Testing FY 2016 Status Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Core, Gregory Matthew

    This report contains a summary of irradiation testing of Fuel Cycle Research and Development (FCRD) Accident Tolerant Fuels Series 1 (ATF 1) experiments performed at Idaho National Laboratory (INL) in FY 2016. ATF 1 irradiation testing work performed in FY 2016 included design, analysis, and fabrication of ATF-1B drop in capsule ATF 1 series experiments and irradiation testing of ATF-1 capsules in the ATR.

  9. Inspector General, DOD, Oversight of the Audit of the FY 2000 Military Retirement Fund Financial Statements

    DTIC Science & Technology

    2001-02-28

    statements and to report on the adequacy of internal controls and compliance with laws and regulations. We contracted the audit of the FY 2000 Military...performed on the oversight of the audit of the FY 2000 Military Retirement Fund Financial Statements.

  10. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project: KDP-A for Phase 2 Minimum Operational Performance Standards

    NASA Technical Reports Server (NTRS)

    Grindle, Laurie; Hackenberg, Davis L.

    2016-01-01

    UAS Integration in the NAS Project has: a) Developed Technical Challenges that are crucial to UAS integration, aligned with NASA's Strategic Plan and Thrusts, and support FAA standards development. b) Demonstrated rigorous project management processes through the execution of previous phases. c) Defined Partnership Plans. d) Established path to KDP-C. Request approval of Technical Challenges, execution of partnerships and plans, and execution of near-term FY17 activities. There is an increasing need to fly UAS in the NAS to perform missions of vital importance to National Security and Defense, Emergency Management, and Science. There is also an emerging need to enable commercial applications such as cargo transport (e.g. FedEx). Unencumbered NAS Access for Civil/Commercial UAS. Provide research findings, utilizing simulation and flight tests, to support the development and validation of DAA and C2 technologies necessary for integrating Unmanned Aircraft Systems into the National Airspace System.

  11. State, Foreign Operations, and Related Programs: FY2008 Appropriations

    DTIC Science & Technology

    2007-10-24

    strong commitment to political, economic and social reforms. The CRS-3 2 PEPFAR countries include Botswana, Cote d’Ivoire, Ethiopia, Kenya, Mozambique...Uzbek, Greek, and Cantonese as well as the RFE/RL Macedonia service. BBG also plans to reduce several others, such as VOA and RFE/RL service in Ukrainian... social services to Iraqi refugees. FY2007 Supplemental Request. On April 25 and 26, the House and Senate passed the conference report (H.Rept. 110-107

  12. Trends in U.S. Global AIDS Spending: FY2000-FY2008

    DTIC Science & Technology

    2008-07-16

    Young Women from HIV/AIDS: The Case Against Child and Adolescent Marriage.” International Family Planning Perspectives, Volume 32, Number 2, June...are more likely to contract HIV than their single counterparts.63 For example, 30% of married adolescents ’ spouses were HIV-positive in Kenya, while...includes language similar CRS-26 69 Ensuring Access to Contraceptives Act of 2007, H.R. 2367. 70 According to the UNAIDS website, “[an] in-depth

  13. Acquisition Workforce: Department of Defense’s Plans to Address Workforce Size and Structure Challenges

    DTIC Science & Technology

    2002-04-01

    FY03 In implementation Grouped into follow-on strategy “ Marketing , Recruiting, & Retention” The military services are already using these programs and...career field or portion of the workforce and expand into other areas of the workforce. FY03 In implementation Grouped into follow-on strategy “ Marketing , Recruiting...facilitate more long-term relationships. Not provided In implementation Grouped into follow-on strategy “ Marketing , Recruiting, & Retention” 12. Establish

  14. 45 CFR 305.42 - Penalty phase-in.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PROGRAM PERFORMANCE MEASURES, STANDARDS, FINANCIAL INCENTIVES, AND PENALTIES § 305.42 Penalty phase-in. States are subject to the performance penalties described in § 305.40 based on data reported for FY 2001. Data reported for FY 2000 will be used as a base year to determine improvements in performance during...

  15. State, Foreign Operations, and Related Programs: FY2008 Appropriations

    DTIC Science & Technology

    2007-06-13

    political, economic and social reforms. The CRS-3 2 PEPFAR countries include Botswana, Cote d’Ivoire, Ethiopia, Kenya, Mozambique, Namibia, Nigeria...planning to eliminate several VOA services including Uzbek, Greek, and Cantonese as well as the RFE/RL Macedonia service. BBG also plans to reduce several

  16. Prevent, Counter, and Respond - A Strategic Plan to Reduce Global Nuclear Threats (FY 2016-FY2020)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2015-03-01

    NNSA’s second core mission is reducing global nuclear dangers by preventing the acquisition of nuclear weapons or weapons-usable materials, countering efforts to acquire such weapons or materials, and responding to nuclear or radiological incidents. In 2015, NNSA reorganized its nonproliferation activities based on core competencies and realigned its counterterrorism and counterproliferation functions to more efficiently address both current and emerging threats and challenges. The reorganization accompanied the March 2015 release of the first ever Prevent, Counter, and Respond – A Strategic Plan to Reduce Global Nuclear Threats. This report, which NNSA will update annually, highlights key nuclear threat trends andmore » describes NNSA’s integrated threat reduction strategy.« less

  17. NEP systems engineering efforts in FY-92: Plans and status

    NASA Technical Reports Server (NTRS)

    Doherty, Michael P.; Gilland, James H.

    1992-01-01

    A system engineering effort has been initiated by NASA in FY-92 to define, address, and resolve issues associated with the use of Nuclear Electric Propulsion (NEP) for megawatt (MW) space propulsion applications associated with the Space Exploration Initiative (SEI). It is intended that key technical issues will be addressed by activities conducted in the early years of a project in NEP, with the objective of resolving such issues. Also, in response to more recent programmatic direction, a concept definition activity for 100 kilowatt NEP is being initiated. This paper will present key issues associated with megawatt NEP, and the plans and status for their resolution, and present the scope and rationale for the 100 kilowatt concept definition activity.

  18. Personal Access Satellite System (PASS) study. Fiscal year 1989 results

    NASA Technical Reports Server (NTRS)

    Sue, Miles K. (Editor)

    1990-01-01

    The Jet Propulsion Laboratory is exploring the potential and feasibility of a personal access satellite system (PASS) that will offer the user greater freedom and mobility than existing or currently planned communications systems. Studies performed in prior years resulted in a strawman design and the identification of technologies that are critical to the successful implementation of PASS. The study efforts in FY-89 were directed towards alternative design options with the objective of either improving the system performance or alleviating the constraints on the user terminal. The various design options and system issues studied this year and the results of the study are presented.

  19. Pentalum SpiDAR Deployment at SWiFT FY17.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Westergaard, Carsten; Pol, Suhas; Pereira, Tassia

    2016-12-01

    The Texas Tech University ( TTU ) research group is actively studying the wake development of wind turbines, as part of developing innovative wake control strategies to improve the performance of wind farms. Recently, the team received a set of five new gro und lidars to perform field measurements at the Sandia National Laboratories SWiFT site. This document describes tests details including configurations, timeframe, hardware, and the required collaboration from the Sandia team. This test plan will facili tate the coordination between both TTU and the Sandia team in terms of site accessibility, staff training, and data sharing to meetmore » the specific objectives of the tests.« less

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nichols, Teresa A.; Lapsa, Melissa Voss

    Oak Ridge National Laboratory (ORNL) is both the largest science and energy laboratory of the US Department of Energy (DOE) and one of the oldest national laboratories still operating at its original site. These characteristics provide the Sustainable Campus Initiative (SCI) both a unique opportunity and a unique challenge to integrate sustainability into facilities and activities. As outlined in this report, SCI is leveraging the outcomes of ORNL’s DOE-sponsored research and development programs to maximize the efficient use of energy and natural resources across ORNL. Wherever possible, ORNL is integrating technical innovations into new and existing facilities, systems, and processesmore » with a widespread approach to achieving Executive Order 13514. ORNL continues to pursue and deploy innovative solutions and initiatives to advance regional, national, and worldwide sustainability and continues to transform its culture and engage employees in supporting sustainability at work, at home, and in the community. Table 1 summarizes ORNL's FY 2013 performance and planned actions to attain future goals. ORNL has achieved numerous successes during FY 2013, which are described in detail throughout this document.« less

  1. Joint Department of Defense, Advance Planning Briefing to Industry, Held at Kissimmee, Florida, on 30 April - 2 May 1996

    DTIC Science & Technology

    1996-05-01

    Systems 17 Motion Bases Upgraded Aero Misc > Contact Info • AMC, Lt Col Letica , Phone (618) 256-5696 L8 Upgrade Flow Plan Advance Planning Briefing...Projected Schedule: FY 05 > Requirement Document: AMMP >• Projected Program Size: ? < $40M > Funding Status/Stability: > POCs: • AMC, Lt Col Letica

  2. Nuclear rocket propulsion technology - A joint NASA/DOE project

    NASA Technical Reports Server (NTRS)

    Clark, John S.

    1991-01-01

    NASA and the DOE have initiated critical technology development for nuclear rocket propulsion systems for SEI human and robotic missions to the moon and to Mars. The activities and project plan of the interagency project planning team in FY 1990 and 1991 are summarized. The project plan includes evolutionary technology development for both nuclear thermal and nuclear electric propulsion systems.

  3. Aviation System Analysis Capability Quick Response System Report

    NASA Technical Reports Server (NTRS)

    Roberts, Eileen; Villani, James A.; Ritter, Paul

    1998-01-01

    The purpose of this document is to present the additions and modifications made to the Aviation System Analysis Capability (ASAC) Quick Response System (QRS) in FY 1997 in support of the ASAC ORS development effort. This document contains an overview of the project background and scope and defines the QRS. The document also presents an overview of the Logistics Management Institute (LMI) facility that supports the QRS, and it includes a summary of the planned additions to the QRS in FY 1998. The document has five appendices.

  4. Strategic Environmental Research & Development Program (SERDP): Phase I and Phase II Strategic Investment Plans FY 1992 and Interim Status Report of the Council.

    DTIC Science & Technology

    1993-10-01

    VLF/ELF) communication systems, used for early warning and strategic communications, are dependent on the electron densities in the "C" and "D...information into optical or electronic signals that can be remotely monitored. During FY92, an in-depth and definitive assessment of the feasibility...particularly metal finishing and electronics operations. BENEFITS: The broad program described above will provide the opportunity for EPA, the

  5. Observations on Polar Coding with CRC-Aided List Decoding

    DTIC Science & Technology

    2016-09-01

    9 v 1. INTRODUCTION Polar codes are a new type of forward error correction (FEC) codes, introduced by Arikan in [1], in which he...error correction (FEC) currently used and planned for use in Navy wireless communication systems. The project’s results from FY14 and FY15 are...good error- correction per- formance. We used the Tal/Vardy method of [5]. The polar encoder uses a row vector u of length N . Let uA be the subvector

  6. NASA's Microgravity Technology Report, 1996: Summary of Activities

    NASA Technical Reports Server (NTRS)

    Kierk, Isabella

    1996-01-01

    This report covers technology development and technology transfer activities within the Microgravity Science Research Programs during FY 1996. It also describes the recent major tasks under the Advanced Technology Development (ATD) Program and identifies current technology requirements. This document is consistent with NASA,s Enteprise for the Human Exploration and development of Space (HEDS) Strategic Plan. This annual update reflects changes in the Microgravity Science Research Program's new technology activities and requirements. Appendix A. FY 1996 Advanced Technology Development. Program and Project Descriptions. Appendix B. Technology Development.

  7. Used Fuel Disposition in Crystalline Rocks: FY16 Progress Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Y.; Hadgu, Teklu; Kalinina, Elena Arkadievna

    The objective of the Crystalline Disposal R&D Work Package is to advance our understanding of long-term disposal of used fuel in crystalline rocks and to develop necessary experimental and computational capabilities to evaluate various disposal concepts in such media. FY16 continued to be a successful year in both experimental and modeling arenas in evaluation of used fuel disposal in crystalline rocks. The work covers a wide range of research topics identified in the R&D plan.

  8. U.S. Marine Corps Landing Force Organizational Systems Study (LFOSS).

    DTIC Science & Technology

    1985-12-01

    should be considered by the reader not as absolute but as planning information. Details on weapons and equipment that are classified are not included...clothing is designed for use in the -25 degree to 40 degree Farenheit range. The IOC is FY 87. (b) Lightweight Shelter System. A vapor- permeable... Farenheit . The IOC for the AVLB is FY 89. (3) M60 Track Width Mine Plow. The Track Width Mine Plow can be rapidly attached to a tank and clear land mines

  9. Spacelab cost reduction alternatives study. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Alternative approaches to payload operations planning and control and flight crew training are defined for spacelab payloads with the goal of: lowering FY77 and FY 78 costs for new starts; lowering costs to achieve Spacelab operational capability; and minimizing the cost per Spacelab flight. These alternatives attempt to minimize duplication of hardware, software, and personnel, and the investment in supporting facility and equipment. Of particular importance is the possible reduction of equipment, software, and manpower resources such as comtational systems, trainers, and simulators.

  10. United States Army Annual Financial Statement FY00. The Army in Transformation Responsive to the Needs of the Nation

    DTIC Science & Technology

    2000-01-01

    continuing cost-cutting measures. Improvements have included establishing clearer customer-provider relationships, adopting private market mechanisms...measured by dividing these costs by gross wholesale sales. In FY 2000, the wholesale division achieved a $1.007 unit cost goal ( UCG ). Target UCG was...0.99. The over-execution of the UCG was due to higher than expected credit. Credit was over plan as a result of the Retail activities turning in more

  11. Title VI-B, Education of the Handicapped Act Annual Program Plan Fiscal Year 1979-Kansas State Department of Education.

    ERIC Educational Resources Information Center

    Kansas State Dept. of Education, Topeka.

    The Kansas state plan for FY 1979 includes information on the following topics: full educational opportunities goal, policy on priorities, child identification, personnel development, individualized education program, procedural safeguards, least restrictive environment, protection in evaluation procedures, participation of private school…

  12. Delivering Innovation: The Joint Concept Development and Experimentation Campaign Plan FY2004-2011

    DTIC Science & Technology

    2004-01-26

    Janushkowsky (STRATCOM), Maj Gen Stenner (SOUTHCOM), LTC Butts (TRANSCOM) Campaign Plan; J9 UpdateFace to Face Conference12 Feb 2003 COL (P) Verbeck (EUCOM... Stenner (SOUTHCOM), Ms. Young (TRANSCOM), MG Higgins (USFK), Dr. Hanley (OSD-OFT), RADM Gallagher (ACT) Combatant Commander Attendees IWS IWS VTC

  13. 78 FR 69412 - Draft FY 2014-2018 EPA Strategic Plan; Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-19

    ... to our existing Plan that seek to advance efforts to address our changing climate, protect our... across the country and tackling the issue of climate change. DATES: Comments must be received on or... business in achieving its results. The five strategic goals are: Addressing Climate Change and Improving...

  14. Transportation Technology Curriculum Materials FY 90. Illinois Plan for Industrial Technology Education.

    ERIC Educational Resources Information Center

    Gallo, Dennis; And Others

    This packet contains technology-based learning activities for the transportation technology course at the orientation level (grades 9 and 10) of the Illinois Plan for Industrial Technology Education curriculum project. The packet includes a course rationale, mission, description, and course outline. Suggested learning objectives and suggested…

  15. Department of Defense Review of the Foreign Comparative Testing Program FY2005-FY2006

    DTIC Science & Technology

    2007-04-01

    Kingdom as a potential alternative to an ongoing domestic development program, which was failing to meet the size, weight , and cost objectives. The...Norway, Switzerland NAMMO, Oerlikon Contraves 0.50 USMC 40mm Training Cartridge MK281 Germany Nico Pyrotechnik 13.14 USMC High Rate-of-Fire .50 Cal...late FY 2003 and, although the system performed as advertised, it did not meet stringent weight requirements. In FY 2005, a down-sized version of

  16. Molecular basis of the Duffy blood group system.

    PubMed

    Höher, Gabriela; Fiegenbaum, Marilu; Almeida, Silvana

    2018-01-01

    ACKR1, located on chromosome 1q23.2, is the gene that encodes a glycoprotein expressing the Duffy blood group antigens. This gene is transcribed in two mRNA variants yielding two isoforms, encoding proteins with 338 and 336 amino acids. This review provides a general overview of the Duffy blood group to characterise and elucidate the genetic basis of this system. The Fy a and Fy b antigens are encoded by co-dominant FY*A (FY*01) and FY*B (FY*02) alleles, which differ by c.125G>A (rs12075), defining the Fy(a+b-), Fy(a-b+) and Fy(a+b+) phenotypes. The Fy(a-b-) phenotype that occurs in Africans provides an explanation for the apparent absence of Plasmodium vivax in this region: this phenotype arises from homozygosity for the FY*B allele carrying a point mutation c.1-67T>C (rs2814778), which prevents Fy b antigen expression only in red blood cells. The same mutation has also been found on the FY*A allele, but it is very rare. The Fy(a-b-) phenotype in Europeans and Asians arises from mutations in the coding region of the FY*A or FY*B allele, preventing Duffy antigen expression on any cell in the body and thus are true Duffy null phenotypes. According to the International Society for Blood Transfusion, ten alleles are associated with the null expression of the Fy antigens. Furthermore, different allelic forms of FY*B modify Fy b antigen expression, which may result in very weak or equivocal serology results. The mostly common found variants, c.265C>T (rs34599082) and c.298G>A (rs13962) -previously defined in combination only with the FY*B allele - have already been observed in the FY*A allele. Thus, six alleles have been recognised and associated with weak expression of the Fy antigens. Considering the importance of the Duffy blood group system in clinical medicine, additional studies via molecular biology approaches must be performed to resolve and clarify the discrepant results that are present in the erythrocyte phenotyping.

  17. Twenty-Five Year Site Plan FY2013 - FY2037

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jones, William H.

    2012-07-12

    Los Alamos National Laboratory (the Laboratory) is the nation's premier national security science laboratory. Its mission is to develop and apply science and technology to ensure the safety, security, and reliability of the United States (U.S.) nuclear stockpile; reduce the threat of weapons of mass destruction, proliferation, and terrorism; and solve national problems in defense, energy, and the environment. The fiscal year (FY) 2013-2037 Twenty-Five Year Site Plan (TYSP) is a vital component for planning to meet the National Nuclear Security Administration (NNSA) commitment to ensure the U.S. has a safe, secure, and reliable nuclear deterrent. The Laboratory also usesmore » the TYSP as an integrated planning tool to guide development of an efficient and responsive infrastructure that effectively supports the Laboratory's missions and workforce. Emphasizing the Laboratory's core capabilities, this TYSP reflects the Laboratory's role as a prominent contributor to NNSA missions through its programs and campaigns. The Laboratory is aligned with Nuclear Security Enterprise (NSE) modernization activities outlined in the NNSA Strategic Plan (May 2011) which include: (1) ensuring laboratory plutonium space effectively supports pit manufacturing and enterprise-wide special nuclear materials consolidation; (2) constructing the Chemistry and Metallurgy Research Replacement Nuclear Facility (CMRR-NF); (3) establishing shared user facilities to more cost effectively manage high-value, experimental, computational and production capabilities; and (4) modernizing enduring facilities while reducing the excess facility footprint. Th is TYSP is viewed by the Laboratory as a vital planning tool to develop an effi cient and responsive infrastructure. Long range facility and infrastructure development planning are critical to assure sustainment and modernization. Out-year re-investment is essential for sustaining existing facilities, and will be re-evaluated on an annual basis. At the same time, major modernization projects will require new line-item funding. This document is, in essence, a roadmap that defines a path forward for the Laboratory to modernize, streamline, consolidate, and sustain its infrastructure to meet its national security mission.« less

  18. Implementation of a new algorithm for Density Equalizing Map Projections (DEMP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Close, E.R.; Merrill, D.W.; Holmes, H.H.

    The purpose of the PAREP (Populations at Risk to Environmental Pollution) Project at Lawrence Berkeley National Laboratory (LBNL), an ongoing Department of Energy (DOE) project since 1978, is to develop resources (data, computing techniques, and biostatistical methodology) applicable to DOE`s needs. Specifically, the PAREP project has developed techniques for statistically analyzing disease distributions in the vicinity of supposed environmental hazards. Such techniques can be applied to assess the health risks in populations residing near DOE installations, provided adequate small-area health data are available. The FY 1994 task descriptions for the PAREP project were determined in discussions at LBNL on 11/2/93.more » The FY94 PAREP Work Authorization specified three major tasks: a prototype small area study, a feasibility study for obtaining small-area data, and preservation of the PAREP data archive. The complete FY94 work plan, and the subtasks accomplished to date, were included in the Cumulative FY94 progress report.« less

  19. NREL Photovoltaic Program FY 1996 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report summarizes the in-house and subcontract research and development (R&D) activities under the National Renewable Energy Laboratory (NREL) Photovoltaics (PV) Program from October 1, 1995 through September 30, 1996 (fiscal year [FY] 1996). The NREL PV Program is part of the U.S. Department of Energy's (DOE) National Photovoltaics Program, as described in the DOE Photovoltaics Program Plan, FY 1991 - FY 1995. The mission of the DOE National Photovoltaics Program is to: "Work in partnership with U.S. industry to develop and deploy photovoltaic technology for generating economically competitive electric power, making photovoltaics an important contributor to the nation's andmore » the world's energy use and environmental improvement. The two primary goals of the national program are to (1) maintain the U.S. PV industry's world leadership in research and technology development and (2) help the U.S. industry remain a major, profitable force in the world market. The NREL PV Program provides leadership and support to the national program toward achieving its mission and goals.« less

  20. 76 FR 11755 - Sunshine Act Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-03

    ... Planning: Update and discussion of projects. Consideration of new statutory report topic for FY 2011... Admissions. English Only in the Workplace Report. Healthcare Disparities Report. V. State Advisory Committee...

  1. Region 9 Tribal Environmental GAP Funding

    EPA Pesticide Factsheets

    EPA Region 9 invites Indian Environmental General Assistance Program (GAP) grant proposals from federally recognized tribal governments and eligible intertribal consortia for FY2019 work plan program development activities.

  2. Pacific Northwest National Laboratory institutional plan: FY 1996--2001

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-01-01

    This report contains the operation and direction plan for the Pacific Northwest National Laboratory of the US Department of Energy. The topics of the plan include the laboratory mission and core competencies, the laboratory strategic plan; the laboratory initiatives in molecular sciences, microbial biotechnology, global environmental change, complex modeling of physical systems, advanced processing technology, energy technology development, and medical technologies and systems; core business areas, critical success factors, and resource projections.

  3. Joint Planning and Development Office Work Plan FY10

    DTIC Science & Technology

    2010-01-01

    IPSA ) Division will make refinements to the NextGen Portfolio Analysis. In addition, IPSA will work with the Department of Defense (DoD) to define and...Submitted Interagency Portfolio and Systems Analysis ( IPSA ) DRAFT DoD Portfolio Analysis Criteria BASELINE DoD Portfolio Analysis Criteria DRAFT...WG Work Plan Review Prototype Capability Selected and Defined CHAs Complete Safety Metrics for IPSA Complete FINAL Prototype Report FINAL

  4. NREL photovoltaic program FY 1997 annual report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McConnell, R.D.; Hansen, A.; Smoller, S.

    1998-06-01

    This report summarizes the in-house and subcontracted research and development (R and D) activities under the NREL PV Program from October 1, 1996, through September 30, 1997 (FY 1997). The NREL PV Program is part of the US Department of Energy`s (DOE`s) National Photovoltaics Program, as described in the DOE National Photovoltaics Program Plan for 1996--2000. The FY 1997 budget authority for carrying out the NREL PV Program was $39.3 million in operating funds and $0.4 million in capital equipment funds. Subcontract activities represent a major part of the NREL PV Program, with $21.8 million (55% of PV funds) goingmore » to some 84 subcontractors. Cost sharing by industry added almost $8.8 million to the subcontract R and D activities with industry.« less

  5. NASA's Microgravity Research Program

    NASA Technical Reports Server (NTRS)

    Woodard, Dan

    1998-01-01

    This fiscal year (FY) 1997 annual report describes key elements of the NASA Microgravity Research Program (MRP) as conducted by the Microgravity Research Division (MRD) within NASA's Office of Life and Microgravity, Sciences and Applications. The program's goals, approach taken to achieve those goals, and program resources are summarized. All snapshots of the program's status at the end of FY 1997 and a review of highlights and progress in grounds and flights based research are provided. Also described are major space missions that flew during FY 1997, plans for utilization of the research potential of the International Space Station, the Advanced Technology Development (ATD) Program, and various educational/outreach activities. The MRP supports investigators from academia, industry, and government research communities needing a space environment to study phenomena directly or indirectly affected by gravity.

  6. Prioritized List of Research Needs to support MRWFD Case Study Flowsheet Advancement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Law, Jack Douglas; Soelberg, Nicholas Ray

    In FY-13, a case study evaluation was performed of full recycle technologies for both the processing of light-water reactor (LWR) used nuclear fuels as well as fast reactor (FR) fuel in the full recycle option. This effort focused on the identification of the case study processes and the initial preparation of material balance flowsheets for the identified technologies. In identifying the case study flowsheets, it was decided that two cases would be developed: one which identifies the flowsheet as currently developed and another near-term target flowsheet which identifies the flowsheet as envisioned within two years, pending the results of ongoingmore » research. The case study focus is on homogeneous aqueous recycle of the U/TRU resulting from the processing of LWR fuel as feed for metal fuel fabrication. The metal fuel is utilized in a sodium-cooled fast reactor, and the used fast reactor fuel is processed using electrochemical separations. The recovered U/TRU from electrochemical separations is recycled to fuel fabrication and the fast reactor. Waste streams from the aqueous and electrochemical processing are treated and prepared for disposition. Off-gas from the separations and waste processing are also treated. As part of the FY-13 effort, preliminary process unknowns and research needs to advance the near-term target flowsheets were identified. In FY-14, these research needs were updated, expanded and prioritized. This report again updates the prioritized list of research needs based upon results to date in FY-15. The research needs are listed for each of the main portions of the flowsheet: 1) Aqueous headend, 2) Headend tritium pretreatment off-gas, 3) Aqueous U/Pu/Np recovery, 4) Aqueous TRU product solidification, 5) Aqueous actinide/lanthanide separation, 6) Aqueous off-gas treatment, 7) Aqueous HLW management, 8) Treatment of aqueous process wastes, 9) E-chem actinide separations, 10) E-chem off-gas, 11) E-chem HLW management. The identified research needs were prioritized within each of these areas. No effort was made to perform an overall prioritization. This information will be used by the MRWFD Campaign leadership in research planning for FY-16. Additionally, this information will be incorporated into the next version of the Case Study Report scheduled to be issued September 2015.« less

  7. Laboratory directed research and development FY98 annual report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Al-Ayat, R; Holzrichter, J

    1999-05-01

    In 1984, Congress and the Department of Energy (DOE) established the Laboratory Directed Research and Development (LDRD) Program to enable the director of a national laboratory to foster and expedite innovative research and development (R and D) in mission areas. The Lawrence Livermore National Laboratory (LLNL) continually examines these mission areas through strategic planning and shapes the LDRD Program to meet its long-term vision. The goal of the LDRD Program is to spur development of new scientific and technical capabilities that enable LLNL to respond to the challenges within its evolving mission areas. In addition, the LDRD Program provides LLNLmore » with the flexibility to nurture and enrich essential scientific and technical competencies and enables the Laboratory to attract the most qualified scientists and engineers. The FY98 LDRD portfolio described in this annual report has been carefully structured to continue the tradition of vigorously supporting DOE and LLNL strategic vision and evolving mission areas. The projects selected for LDRD funding undergo stringent review and selection processes, which emphasize strategic relevance and require technical peer reviews of proposals by external and internal experts. These FY98 projects emphasize the Laboratory's national security needs: stewardship of the U.S. nuclear weapons stockpile, responsibility for the counter- and nonproliferation of weapons of mass destruction, development of high-performance computing, and support of DOE environmental research and waste management programs.« less

  8. Arizona State Plan for the Education of Migratory Children Fiscal Year 1980.

    ERIC Educational Resources Information Center

    Maynes, J. O.

    Documentation forwarded to the U. S. Office of Education describing the Arizona State Plan for the Education of Migrant Children for fiscal year (FY) 1980 and requesting financial assistance to provide supplemental educational and support services to children of migratory farmworkers and fishermen enrolled in local school districts is presented.…

  9. Strategic Plan for Information Resources Management, FY 1993-97: Improving Education through Automation.

    ERIC Educational Resources Information Center

    Texas Education Agency, Austin.

    In support of educational excellence and equity, the Texas Education Agency views all state public education information resources and technology as strategic assets of the education enterprise. This plan is presented in support of the goals of enhancing instruction through technology, restructuring the data processing environment for…

  10. U.S. Marine Corps Enlisted Retention: An Analysis of Stakeholder Incentives for the Retention of Tier 1 First-Term Marines

    DTIC Science & Technology

    2014-03-01

    ERTF Enlisted Retention Task Force FFM fast filling military occupational specialty FTAP first-term alignment plan FY fiscal year GT general...Planning military ( FFM ) occupational specialties that are processed through boards to ensure the retention of highly qualified Marines. Fast-filling

  11. Building a commercial enterprise : FY01-05 financial plan update : investing in the future of passenger rail : long-term capital plan

    DOT National Transportation Integrated Search

    2001-01-01

    As we enter the 21st century, the nations transportation system is at a crossroads. After : building highway and aviation networks that are the envy of the world, increasing gridlock threatens to undermine the success of those investments and the ...

  12. 75 FR 53324 - Notice of Availability: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-31

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5415-N-25] Notice of Availability... either a Choice Neighborhood Planning Grant or a Choice Neighborhood Implementation Grant application. Upon conclusion of its review of Planning Grant applications submitted in response to the Round 1 NOFA...

  13. Ernest Orlando Lawrence Berkeley National Laboratory institutional plan, FY 1996--2001

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-11-01

    The FY 1996--2001 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Laboratory Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It alsomore » summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by the Laboratory`s scientific and support divisions.« less

  14. Introduction to Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Kohrs, Richard

    1992-01-01

    NASA field centers and contractors are organized to develop 'work packages' for Space Station Freedom. Marshall Space Flight Center and Boeing are building the U.S. laboratory and habitation modules, nodes, and environmental control and life support system; Johnson Space Center and McDonnell Douglas are responsible for truss structure, data management, propulsion systems, thermal control, and communications and guidance; Lewis Research Center and Rocketdyne are developing the power system. The Canadian Space Agency (CSA) is contributing a Mobile Servicing Center, Special Dextrous Manipulator, and Mobile Servicing Center Maintenance Depot. The National Space Development Agency of Japan (NASDA) is contributing a Japanese Experiment Module (JEM), which includes a pressurized module, logistics module, and exposed experiment facility. The European Space Agency (ESA) is contributing the Columbus laboratory module. NASA ground facilities, now in various stages of development to support Space Station Freedom, include: Marshall Space Flight Center's Payload Operations Integration Center and Payload Training Complex (Alabama), Johnson Space Center's Space Station Control Center and Space Station Training Facility (Texas), Lewis Research Center's Power System Facility (Ohio), and Kennedy Space Center's Space Station Processing Facility (Florida). Budget appropriations impact the development of the Space Station. In Fiscal Year 1988, Congress appropriated only half of the funds that NASA requested for the space station program ($393 million vs. $767 million). In FY 89, NASA sought $967 million for the program, and Congress appropriated $900 million. NASA's FY 90 request was $2.05 billion compared to an appropriation of $1.75 billion; the FY 91 request was $2.45 billion, and the appropriation was $1.9 billion. After NASA restructured the Space Station Freedom program in response to directions from Congress, the agency's full budget request of $2.029 billion for Space Station Freedom in FY 92 was appropriated. For FY 93, NASA is seeking $2.25 billion for the program; the planned budget for FY 94 is $2.5 billion. Further alterations to the hardware configuration for Freedom would be a serious setback; NASA intends 'to stick with the current baseline' and continue planning for utilization.

  15. AMATS FY 1997-2000 Transportation Improvement Program

    DOT National Transportation Integrated Search

    1996-06-26

    Planning, design and construction of major transportation capital : investment projects, such as major highway relocations and transit service expansions, are costly and time-consuming. Even relatively minor improvements require substantial investmen...

  16. 78 FR 51266 - Sunshine Act Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-20

    ... of assistant corporate secretaries. 2. Chairman's report. 3. Report from President and CEO. 4. Report of the Finance, Rates, and Portfolio Committee. A. FY 2014 financial plan and budget. B. Rate actions...

  17. Notification: Background Investigation Services

    EPA Pesticide Factsheets

    Project #OA-FY15-0029, February 26, 2015. The Office of Inspector General (OIG) for the U.S. Environmental Protection Agency (EPA) plans to begin field work for our audit of background investigation services.

  18. Physics of the Cosmos Program Annual Technology Report

    NASA Technical Reports Server (NTRS)

    Pham, Bruce Thai; Cardiff, Ann H.

    2015-01-01

    What's in this Report? What's New? This fifth Program Annual Technology Report (PATR) summarizes the Programs technology development activities for fiscal year (FY) 2015. The PATR serves four purposes.1. Summarize the technology gaps identified by the astrophysics community;2. Present the results of this years technology gap prioritization by the PCOS Technology Management Board (TMB);3. Report on newly funded PCOS Strategic Astrophysics Technology (SAT) projects; and4. Detail progress, current status, and activities planned for the coming year for all technologies supported by PCOS Supporting Research and Technology (SRT) funding in FY 2015. .

  19. Fiscal Year (FY) 2017 Activities for the Spent Fuel Nondestructive Assay Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trellue, Holly Renee; Trahan, Alexis Chanel; McMath, Garrett Earl

    The main focus of research in the NA-241 spent fuel nondestructive assay (NDA) project in FY17 has been completing the fabrication and testing of two prototype instruments for upcoming spent fuel measurements at the Clab interim storage facility in Sweden. One is a passive instrument: Differential Die-away Self Interrogation-Passive Neutron Albedo Reactivity (DDSI), and one is an active instrument: Differential Die-Away-Californium Interrogation with Prompt Neutron (DDA). DDSI was fabricated and tested with fresh fuel at Los Alamos National Laboratory in FY15 and FY16, then shipped to Sweden at the beginning of FY17. Research was performed in FY17 to simplify resultsmore » from the data acquisition system, which is complex because signals from 56 different 3He detectors must be processed using list mode data. The DDA instrument was fabricated at the end of FY16. New high count rate electronics better suited for a spent fuel environment (i.e., KM-200 preamplifiers) were built specifically for this instrument in FY17, and new Tygon tubing to house electrical cables was purchased and installed. Fresh fuel tests using the DDA instrument with numerous configurations of fuel rods containing depleted uranium (DU), low enriched uranium (LEU), and LEU with burnable poisons (Gd) were successfully performed and compared to simulations.1 Additionally, members of the spent fuel NDA project team travelled to Sweden for a “spent fuel characterization and decay heat” workshop involving simulations of spent fuel and analysis of uncertainties in decay heat calculations.« less

  20. FY97 Geophysics Technology Area Plan.

    DTIC Science & Technology

    1997-03-01

    example, Seeker and Missile Simulations technology will be developed to make theater (DISAMS). This plan has been reviewed by all Air Force laboratory ...INDUSTRIAL RESEARCH AND Geophysics is a pervasive technology that directly DEVELOPMENT (IRAD): A comparison of the interacts with all of the other Air Force ...radiation belt models roadmaps that contain research programs underway has been halted. and planned by the Air Force and National Aeronau- 0 The design of

  1. National Institute on Disability and Rehabilitation Research--Notice of Final Long-Range Plan for Fiscal Years 2005-2009. Federal Register, Part III: Department of Education

    ERIC Educational Resources Information Center

    National Archives and Records Administration, 2006

    2006-01-01

    The Assistant Secretary for Special Education and Rehabilitative Services (OSERS) publishes the Final Long-Range Plan (Final Plan) for the National Institute on Disability and Rehabilitation Research (NIDRR) for FY 2005 through 2009. As required by the Rehabilitation Act of 1973, as amended (Act), the Assistant Secretary takes this action to…

  2. Navy-Marine Corps Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues for Congress

    DTIC Science & Technology

    2006-07-26

    FY2008. Although the Navy’s proposed force of 31 amphibious ships includes 10 LPD-17 class ships, the Navy is planning to end LPD-17 procurement in...expresses concerns about the planned reduction in amphibious ships, the sea basing concept, and the MPF(F) program, and requires a report on sea basing...Ship Force Structure Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Sea Basing Concept of Operations

  3. FY 1978 Budget, FY 1979 Authorization Request and FY 1978-1982 Defense Programs,

    DTIC Science & Technology

    1977-01-17

    technological opportunities with defense applica- tions -- such as long-range cruise missiles and guidance, improved sensors, 25 miniaturization, and computer ...Various methods exist for computing the number of theater nuclear weapons needed to perform these missions with an acceptable level of confidence...foreign military forces. Mini-micro computers are especially interesting. -- Finally, since geography remains important, we must recognize that the

  4. Molecular basis of the Duffy blood group system

    PubMed Central

    Höher, Gabriela; Fiegenbaum, Marilu; Almeida, Silvana

    2018-01-01

    ACKR1, located on chromosome 1q23.2, is the gene that encodes a glycoprotein expressing the Duffy blood group antigens. This gene is transcribed in two mRNA variants yielding two isoforms, encoding proteins with 338 and 336 amino acids. This review provides a general overview of the Duffy blood group to characterise and elucidate the genetic basis of this system. The Fya and Fyb antigens are encoded by co-dominant FY*A (FY*01) and FY*B (FY*02) alleles, which differ by c.125G>A (rs12075), defining the Fy(a+b−), Fy(a−b+) and Fy(a+b+) phenotypes. The Fy(a−b−) phenotype that occurs in Africans provides an explanation for the apparent absence of Plasmodium vivax in this region: this phenotype arises from homozygosity for the FY*B allele carrying a point mutation c.1-67T>C (rs2814778), which prevents Fyb antigen expression only in red blood cells. The same mutation has also been found on the FY*A allele, but it is very rare. The Fy(a−b−) phenotype in Europeans and Asians arises from mutations in the coding region of the FY*A or FY*B allele, preventing Duffy antigen expression on any cell in the body and thus are true Duffy null phenotypes. According to the International Society for Blood Transfusion, ten alleles are associated with the null expression of the Fy antigens. Furthermore, different allelic forms of FY*B modify Fyb antigen expression, which may result in very weak or equivocal serology results. The mostly common found variants, c.265C>T (rs34599082) and c.298G>A (rs13962) -previously defined in combination only with the FY*B allele - have already been observed in the FY*A allele. Thus, six alleles have been recognised and associated with weak expression of the Fy antigens. Considering the importance of the Duffy blood group system in clinical medicine, additional studies via molecular biology approaches must be performed to resolve and clarify the discrepant results that are present in the erythrocyte phenotyping. PMID:28151395

  5. Department of Commerce Semiannual Regulatory Agenda

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-20

    ... Fishery Management 0648-AY50 Plan 284 Fishing Year 2010 Atlantic Deep-Sea Red Crab Specifications 0648...-AY82 Inseason Adjustments 290 Inseason Adjustment to the FY 2010 Atlantic Deep Sea Red Crab...

  6. Notification: Management of Travel Cards

    EPA Pesticide Factsheets

    Project #OA-FY15-0156, April 20, 2015. The U.S. Environmental Protection Agency (EPA), Office of Inspector General (OIG), plans to begin preliminary research for an audit of the management of travel cards.

  7. Notification: Evaluation of Laboratory Equipment Utilization

    EPA Pesticide Factsheets

    Project #OPE-FY14-0024, April 08, 2014. The Office of Inspector General plans to begin preliminary research on equipment utilization within the U.S. Environmental Protection Agency Office of Research and Development.

  8. TRU Waste Management Program. Cost/schedule optimization analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  9. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-10-01

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation's scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The plan is an institutional management report for integration with the Department of Energy's strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory's scientific and support divisions.« less

  10. FY13 Summary Report on the Augmentation of the Spent Fuel Composition Dataset for Nuclear Forensics: SFCOMPO/NF

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brady Raap, Michaele C.; Lyons, Jennifer A.; Collins, Brian A.

    This report documents the FY13 efforts to enhance a dataset of spent nuclear fuel isotopic composition data for use in developing intrinsic signatures for nuclear forensics. A review and collection of data from the open literature was performed in FY10. In FY11, the Spent Fuel COMPOsition (SFCOMPO) excel-based dataset for nuclear forensics (NF), SFCOMPO/NF was established and measured data for graphite production reactors, Boiling Water Reactors (BWRs) and Pressurized Water Reactors (PWRs) were added to the dataset and expanded to include a consistent set of data simulated by calculations. A test was performed to determine whether the SFCOMPO/NF dataset willmore » be useful for the analysis and identification of reactor types from isotopic ratios observed in interdicted samples.« less

  11. LDEF systems special investigation group overview

    NASA Technical Reports Server (NTRS)

    Mason, Jim; Dursch, Harry

    1995-01-01

    The Systems Special Investigation Group (Systems SIG), formed by the LDEF Project Office to perform post-flight analysis of LDEF systems hardware, was chartered to investigate the effects of the extended LDEF mission on both satellite and experiment systems and to coordinate and integrate all systems related analyses performed during post-flight investigations. The Systems SIG published a summary report in April, 1992 titled 'Analysis of Systems Hardware Flown on LDEF - Results of the Systems Special Investigation Group' that described findings through the end of 1991. The Systems SIG, unfunded in FY 92 and FY93, has been funded in FY 94 to update this report with all new systems related findings. This paper provides a brief summary of the highlights of earlier Systems SIG accomplishments and describes tasks the Systems SIG has been funded to accomplish in FY 94.

  12. Child Care and Development Fund: Report of State and Territory Plans, FY 2010-2011

    ERIC Educational Resources Information Center

    Child Care Bureau, 2011

    2011-01-01

    This report was prepared by the National Child Care Information and Technical Assistance Center (NCCIC) in partnership with staff from the Child Care Bureau. NCCIC compiled data reported in approved CCDF Plans and relevant attachments submitted by Lead Agencies for a selected number of questions. The information presented reflects some of the…

  13. 76 FR 34903 - Revisions to Framework Adjustment 45 to the Northeast Multispecies Fishery Management Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-15

    ... Management Plan and Sector Annual Catch Entitlements; Updated Annual Catch Limits for Sectors and the Common... (ACLs) for common pool vessels (common pool sub-ACLs), ACLs for sector vessels (sector sub-ACLs), and... number of participants electing to fish in either sectors or the common pool fishery in FY 2011. DATES...

  14. Department of Defense Plan to Establish Public Access to the Results of Federally Funded Research

    DTIC Science & Technology

    2015-02-01

    journal articles , data management plans, and will track metrics on compliance and public usage. The current DTIC infrastructure will be modified to...tokens to authors who submit digitally formatted scientific data and articles . DTIC will establish compliance metrics in FY15. DoD will explore...15 10. METRICS , COMPLIANCE and EVALUATION

  15. World weather program

    NASA Technical Reports Server (NTRS)

    1980-01-01

    A brief description of the Global Weather Experiment is presented. The world weather watch program plan is described and includes a global observing system, a global data processing system, a global telecommunication system, and a voluntary cooperation program. A summary of Federal Agency plans and programs to meet the challenges of international meteorology for the two year period, FY 1980-1981, is presented.

  16. Data-Based Performance Assessments for the DOE Hydropower Advancement Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    March, Patrick; Wolff, Dr. Paul; Smith, Brennan T

    2012-01-01

    The U. S. Department of Energy s Hydropower Advancement Project (HAP) was initiated to characterize and trend hydropower asset conditions across the U.S.A. s existing hydropower fleet and to identify and evaluate the upgrading opportunities. Although HAP includes both detailed performance assessments and condition assessments of existing hydropower plants, this paper focuses on the performance assessments. Plant performance assessments provide a set of statistics and indices that characterize the historical extent to which each plant has converted the potential energy at a site into electrical energy for the power system. The performance metrics enable benchmarking and trending of performance acrossmore » many projects in a variety contexts (e.g., river systems, power systems, and water availability). During FY2011 and FY2012, assessments will be performed on ten plants, with an additional fifty plants scheduled for FY2013. This paper focuses on the performance assessments completed to date, details the performance assessment process, and describes results from the performance assessments.« less

  17. Notification: EPA Conferences - Maximizing Cost Efficiencies

    EPA Pesticide Factsheets

    Project #OA-FY15-0381, September 19, 2014. The U.S. Environmental Protection Agency (EPA) Office of Inspector General (OIG) plans to begin preliminary research in October 2014 for an audit of conference spending.

  18. Notification: Audit of EPA's Cloud Computer Initiative

    EPA Pesticide Factsheets

    Project #OA-FY13-0095, December 17, 2012. The U.S. Environmental Protection Agency (EPA) Office of Inspector General plans to begin preliminary research on the audit of EPA’s cloud computer initiative.

  19. FY18 State Of NASA Budget

    NASA Image and Video Library

    2017-05-22

    On May 23, the Acting Administrator Robert Lightfoot gave a State of NASA address at Headquarters to rollout the Fiscal Year 2018 Budget proposal. This video highlights the future-facing vision of those plans.

  20. Notification: Evaluate EPA’s Progress Under Plan EJ 2014

    EPA Pesticide Factsheets

    Project #OPE-FY14-0040, June 9, 2014. The U.S. Environmental Protection Agency's (EPA's) Office of Inspector General (OIG) is starting preliminary research on the EPA's oversight of environmental justice activities.

  1. Benchmarking of OEM Hybrid Electric Vehicles at NREL: Milestone Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kelly, K. J.; Rajagopalan, A.

    2001-10-26

    A milestone report that describes the NREL's progress and activities related to the DOE FY2001 Annual Operating Plan milestone entitled ''Benchmark 2 new production or pre-production hybrids with ADVISOR.''

  2. Examination of the costs, benefits and enery conservation aspects of the NASA aircraft fuel conservation technology program

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The costs and benefits of the NASA Aircraft Fuel Conservation Technology Program are discussed. Consideration is given to a present worth analysis of the planned program expenditures, an examination of the fuel savings to be obtained by the year 2005 and the worth of this fuel savings relative to the investment required, a comparison of the program funding with that planned by other Federal agencies for energy conservation, an examination of the private industry aeronautical research and technology financial posture for the period FY 76 - FY 85, and an assessment of the potential impacts on air and noise pollution. To aid in this analysis, a computerized fleet mix forecasting model was developed. This model enables the estimation of fuel consumption and present worth of fuel expenditures for selected commerical aircraft fleet mix scenarios.

  3. Computer system evolution requirements for autonomous checkout of exploration vehicles

    NASA Technical Reports Server (NTRS)

    Davis, Tom; Sklar, Mike

    1991-01-01

    This study, now in its third year, has had the overall objective and challenge of determining the needed hooks and scars in the initial Space Station Freedom (SSF) system to assure that on-orbit assembly and refurbishment of lunar and Mars spacecraft can be accomplished with the maximum use of automation. In this study automation is all encompassing and includes physical tasks such as parts mating, tool operation, and human visual inspection, as well as non-physical tasks such as monitoring and diagnosis, planning and scheduling, and autonomous visual inspection. Potential tasks for automation include both extravehicular activity (EVA) and intravehicular activity (IVA) events. A number of specific techniques and tools have been developed to determine the ideal tasks to be automated, and the resulting timelines, changes in labor requirements and resources required. The Mars/Phobos exploratory mission developed in FY89, and the Lunar Assembly/Refurbishment mission developed in FY90 and depicted in the 90 Day Study as Option 5, have been analyzed in detailed in recent years. The complete methodology and results are presented in FY89 and FY90 final reports.

  4. Project Plan: Salt in Situ Heater Test.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kuhlman, Kristopher L.; Mills, Melissa Marie; Herrick, Courtney G.

    This project plan gives a high-level description of the US Department of Energy Office of Nuclear Energy (DOE-NE) Spent Fuel and Waste Disposition (SFWD) campaign in situ borehole heater test project being planned for the Waste Isolation Pilot Plant (WIPP) site This plan provides an overview of the schedule and responsibilities of the parties involved. This project is a collaborative effort by Sandia, Los Alamos, and Lawrence Berkeley National Laboratories to execute a series of small-diameter borehole heater tests in salt for the DOE-NE SFWD campaign. Design of a heater test in salt at WIPP has evolved over several years.more » The current design was completed in fiscal year 2017 (FY17), an equipment shakedown experiment is underway in April FY18, and the test implementation will begin in summer of FY18. The project comprises a suite of modular tests, which consist of a group of nearby boreholes in the wall of drifts at WIPP. Each test is centered around a packer-isolated heated borehole (5" diameter) containing equipment for water-vapor collection and brine sampling, surrounded by smaller-diameter (2" diameter) satellite observation boreholes. Observation boreholes will contain temperature sensors, tracer release points, electrical resistivity tomography (ERT) sensors, fiber optic sensing, and acoustic emission (AE) measurements, and sonic velocity sources and sensors. These satellite boreholes will also be used for plugging/sealing tests. The first two tests to be implemented will have the packer-isolated borehole heated to 120°C, with one observation borehole used to monitor changes. Follow-on tests will be designed using information gathered from the first two tests, will be conducted at other temperatures, will use multiple observation boreholes, and may include other measurement types and test designs.« less

  5. Alternative Electrochemical Salt Waste Forms, Summary of FY11-FY12 Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Riley, Brian J.; Mccloy, John S.; Crum, Jarrod V.

    2014-01-17

    The Fuel Cycle Research and Development Program, sponsored by the U.S. Department of Energy Office of Nuclear Energy, is currently investigating alternative waste forms for wastes generated from nuclear fuel processing. One such waste results from an electrochemical separations process, called the “Echem” process. The Echem process utilizes a molten KCl-LiCl salt to dissolve the fuel. This process results in a spent salt containing alkali, alkaline earth, lanthanide halides and small quantities of actinide halides, where the primary halide is chloride with a minor iodide fraction. Pacific Northwest National Laboratory (PNNL) is concurrently investigating two candidate waste forms for themore » Echem spent-salt: high-halide minerals (i.e., sodalite and cancrinite) and tellurite (TeO2)-based glasses. Both of these candidates showed promise in fiscal year (FY) 2009 and FY2010 with a simplified nonradioactive simulant of the Echem waste. Further testing was performed on these waste forms in FY2011 and FY2012 to assess the possibility of their use in a sustainable fuel cycle. This report summarizes the combined results from FY2011 and FY2012 efforts.« less

  6. 76 FR 58277 - Animal Generic Drug User Fee Act; Public Meeting; Request for Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-20

    ... including specific suggestions for changes to the goals referred to in section 740A(a) of FD&C Act; (3... performance goals for certain submissions over 5 years from fiscal year (FY) 2009 through FY 2013. These review performance goals strive to expedite the review of abbreviated new animal drug applications...

  7. Institutional plan FY 1999--FY 2004

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-10-01

    Los Alamos has a well-defined and nationally important mission: to reduce the global nuclear danger. This central national security mission consists of four main elements: stockpile stewardship, nuclear materials management, nonproliferation and arms control, and cleanup of the environmental legacy of nuclear weapons activities. The Laboratory provides support for and ensures confidence in the nation`s nuclear stockpile without nuclear testing. This challenge requires the Laboratory to continually hone its scientific acumen and technological capabilities to perform this task reliably using an interdisciplinary approach and advanced experimental and modeling techniques. In the last two National Defense Authorization Acts, Congress identified themore » need to protect the nation from the proliferation of weapons of mass destruction, which includes nuclear, chemical, and biological weapons, and their potential use by terrorists. Los Alamos is applying multidisciplinary science and engineering skills to address these problems. In addition, the Laboratory`s critical programmatic roles in stockpile stewardship and threat reduction are complemented by its waste management operations and environmental restoration work. Information on specific programs is available in Section 2 of this document.« less

  8. Lawrence Berkeley Laboratory, Institutional Plan FY 1994--1999

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-09-01

    The Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. For FY 1994-1999 the Institutional Plan reflects significant revisions based on the Laboratory`s strategic planning process. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory, and the resources required for their implementation. The Scientific and Technical Programs section summarizesmore » current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff diversity and development program. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The new section on Information Resources reflects the importance of computing and communication resources to the Laboratory. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process.« less

  9. Environmental restoration and waste management five year plan, fiscal years 1994--1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a bottom up'' approach to planning by using Activity Data Sheets to collect financial and technical information atmore » the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE's commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE's environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals.« less

  10. Environmental restoration and waste management five year plan, fiscal years 1994--1998. Executive summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a ``bottom up`` approach to planning by using Activity Data Sheets to collect financial and technical information atmore » the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE`s commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE`s environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals.« less

  11. Notification: EPA Benefits from STAR Grant Results

    EPA Pesticide Factsheets

    Project #OPE-FY15-0017, January 15, 2015. The Office of Inspector General (OIG) for the U.S. Environmental Protection Agency (EPA) plans to begin preliminary research on results from Science to Achieve Results (STAR) grants.

  12. Notification: Methods for Procuring Supplies and Services Under Simplified Acquisition Procedures

    EPA Pesticide Factsheets

    Project #OA-FY15-0193, June 18, 2015. The EPA OIG plans to begin the preliminary research phase of auditing the methods used in procuring supplies and services under simplified acquisition procedures.

  13. Notification: EPA Conferences – Maximizing Cost Efficiencies

    EPA Pesticide Factsheets

    Project #OA-FY14-0381, February 2, 2015. The EPA OIG plans to begin field work with an objective modified from our October 2, 2014, kickoff meeting with the Office of the Chief Financial Officer (OCFO).

  14. Notification: EPA Investments in Information Technology Products and Services

    EPA Pesticide Factsheets

    Project #OA-FY14-0307, June 10, 2014. The U.S. Environmental Protection Agency (EPA) Office oflnspector General (OIG) plans to begin preliminary research on the EPA's management of information technology (IT) investments.

  15. Notification: Audit of EPA Customer Service Help Desks, Hotlines, and Clearinghouses

    EPA Pesticide Factsheets

    Project #OA-FY12-0570, July 12, 2012. The EPA Office of Inspector General (OIG) plans to begin preliminary research on EPA’s customer service help desks, hotlines, and clearinghouses (contact centers).

  16. NASA/MSFC FY-81 Atmospheric Processes Research Review

    NASA Technical Reports Server (NTRS)

    Turner, R. E. (Compiler)

    1981-01-01

    Progress in ongoing research programs and future plans for satellite investigations into global weather, upper atmospheric phenomena, and severe storms and local weather are summarized. Principle investigators and publications since June 1980 are listed.

  17. Annual Plan for the EPA and CSB - FY 2013

    EPA Pesticide Factsheets

    How the OIG will achieve its statutory mission of promoting economy, efficiency, effectiveness, and integrity relating to the programs and operations of EPA and the U.S. Chemical Safety and Hazard Investigation Board.

  18. Notification: Review of the Contract Management Assessment Program

    EPA Pesticide Factsheets

    Project #OA-FY14-0034, October 30, 2013. The Office of Inspector General plans to begin the preliminary research phase of an audit evaluating the Office of Acquisition Management’s Contract Management Assessment Program (CMAP).

  19. Notification: Review of Puget Sound Action Agenda Grants

    EPA Pesticide Factsheets

    Project #OA-FY13-0341, June 26, 2013. The U.S. Environmental Protection Agency, Office of Inspector General, plans to begin preliminary research for an audit of Puget Sound Action Agenda grants in July 2013.

  20. Notification: Benefits to EPA Research Goals from Reimbursable Research

    EPA Pesticide Factsheets

    Project #OPE-FY15-0021, March 19, 2015. The Office of Inspector General (OIG) plans to begin preliminary research on the Office of Research and Development’s reimbursable research agreements on April 3, 2015.

  1. Effect of Lean Processes on Surgical Wait Times and Efficiency in a Tertiary Care Veterans Affairs Medical Center.

    PubMed

    Valsangkar, Nakul P; Eppstein, Andrew C; Lawson, Rick A; Taylor, Amber N

    2017-01-01

    There are an increasing number of veterans in the United States, and the current delay and wait times prevent Veterans Affairs institutions from fully meeting the needs of current and former service members. Concrete strategies to improve throughput at these facilities have been sparse. To identify whether lean processes can be used to improve wait times for surgical procedures in Veterans Affairs hospitals. Databases in the Veterans Integrated Service Network 11 Data Warehouse, Veterans Health Administration Support Service Center, and Veterans Information Systems and Technology Architecture/Dynamic Host Configuration Protocol were queried to assess changes in wait times for elective general surgical procedures and clinical volume before, during, and after implementation of lean processes over 3 fiscal years (FYs) at a tertiary care Veterans Affairs medical center. All patients evaluated by the general surgery department through outpatient clinics, clinical video teleconferencing, and e-consultations from October 2011 through September 2014 were included. Patients evaluated through the emergency department or as inpatient consults were excluded. The surgery service and systems redesign service held a value stream analysis in FY 2013, culminating in multiple rapid process improvement workshops. Multidisciplinary teams identified systemic inefficiencies and strategies to improve interdepartmental and patient communication to reduce canceled consultations and cases, diagnostic rework, and no-shows. High-priority triage with enhanced operating room flexibility was instituted to reduce scheduling wait times. General surgery department pilot projects were then implemented mid-FY 2013. Planned outcome measures included wait time, clinic and telehealth volume, number of no-shows, and operative volume. Paired t tests were used to identify differences in outcome measures after the institution of reforms. Following rapid process improvement workshop project rollouts, mean (SD) patient wait times for elective general surgical procedures decreased from 33.4 (8.3) days in FY 2012 to 26.0 (9.5) days in FY 2013 (P = .02). In FY 2014, mean (SD) wait times were half the value of the previous FY at 12.0 (2.1) days (P = .07). This was a 3-fold decrease from wait times in FY 2012 (P = .02). Operative volume increased from 931 patients in FY 2012 to 1090 in FY 2013 and 1072 in FY 2014. Combined clinic, telehealth, and e-consultation encounters increased from 3131 in FY 2012 to 3460 in FY 2013 and 3517 in FY 2014, while the number of no-shows decreased from 366 in FY 2012 to 227 in FY 2014 (P = .02). Improvement in the overall surgical patient experience can stem from multidisciplinary collaboration among systems redesign personnel, clinicians, and surgical staff to reduce systemic inefficiencies. Monitoring and follow-up of system efficiency measures and the employment of lean practices and process improvements can have positive short- and long-term effects on wait times, clinical throughput, and patient care and satisfaction.

  2. Planning for Pre-Exascale Platform Environment (Fiscal Year 2015 Level 2 Milestone 5216)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Springmeyer, R.; Lang, M.; Noe, J.

    This Plan for ASC Pre-Exascale Platform Environments document constitutes the deliverable for the fiscal year 2015 (FY15) Advanced Simulation and Computing (ASC) Program Level 2 milestone Planning for Pre-Exascale Platform Environment. It acknowledges and quantifies challenges and recognized gaps for moving the ASC Program towards effective use of exascale platforms and recommends strategies to address these gaps. This document also presents an update to the concerns, strategies, and plans presented in the FY08 predecessor document that dealt with the upcoming (at the time) petascale high performance computing (HPC) platforms. With the looming push towards exascale systems, a review of themore » earlier document was appropriate in light of the myriad architectural choices currently under consideration. The ASC Program believes the platforms to be fielded in the 2020s will be fundamentally different systems that stress ASC’s ability to modify codes to take full advantage of new or unique features. In addition, the scale of components will increase the difficulty of maintaining an errorfree system, thus driving new approaches to resilience and error detection/correction. The code revamps of the past, from serial- to vector-centric code to distributed memory to threaded implementations, will be revisited as codes adapt to a new message passing interface (MPI) plus “x” or more advanced and dynamic programming models based on architectural specifics. Development efforts are already underway in some cases, and more difficult or uncertain aspects of the new architectures will require research and analysis that may inform future directions for program choices. In addition, the potential diversity of system architectures may require parallel if not duplicative efforts to analyze and modify environments, codes, subsystems, libraries, debugging tools, and performance analysis techniques as well as exploring new monitoring methodologies. It is difficult if not impossible to selectively eliminate some of these activities until more information is available through simulations of potential architectures, analysis of systems designs, and informed study of commodity technologies that will be the constituent parts of future platforms.« less

  3. High Resolution Near Real Time Image Processing and Support for MSSS Modernization

    NASA Astrophysics Data System (ADS)

    Duncan, R. B.; Sabol, C.; Borelli, K.; Spetka, S.; Addison, J.; Mallo, A.; Farnsworth, B.; Viloria, R.

    2012-09-01

    This paper describes image enhancement software applications engineering development work that has been performed in support of Maui Space Surveillance System (MSSS) Modernization. It also includes R&D and transition activity that has been performed over the past few years with the objective of providing increased space situational awareness (SSA) capabilities. This includes Air Force Research Laboratory (AFRL) use of an FY10 Dedicated High Performance Investment (DHPI) cluster award -- and our selection and planned use for an FY12 DHPI award. We provide an introduction to image processing of electro optical (EO) telescope sensors data; and a high resolution image enhancement and near real time processing and summary status overview. We then describe recent image enhancement applications development and support for MSSS Modernization, results to date, and end with a discussion of desired future development work and conclusions. Significant improvements to image processing enhancement have been realized over the past several years, including a key application that has realized more than a 10,000-times speedup compared to the original R&D code -- and a greater than 72-times speedup over the past few years. The latest version of this code maintains software efficiency for post-mission processing while providing optimization for image processing of data from a new EO sensor at MSSS. Additional work has also been performed to develop low latency, near real time processing of data that is collected by the ground-based sensor during overhead passes of space objects.

  4. Defense Logistics Agency FY 1998 Property, Plant, and Equipment Financial Reporting

    DTIC Science & Technology

    1999-04-26

    0it ort DEFENSE LOGISTICS AGENCY FY 1998 PROPERTY, PLANT, AND EQUIPMENT FINANCIAL REPORTING Report No. 99-142 April 26, 1999 Office of the Inspector...LOGISTICS AGENCY SUBJECT: Audit Report on Defense Logistics Agency FY 1998 Property, Plant, and Equipment Financial Reporting (Report No. 99-142) We...Property, Plant, and Equipment Financial Reporting Executive Summary Introduction. The audit was performed in support of our work to meet the requirements of

  5. Oklahoma State Plan, FY 88-90: Part B of the Education of the Handicapped Act as amended by Public Law 94-142.

    ERIC Educational Resources Information Center

    Oklahoma State Dept. of Education, Oklahoma City. Div. of Special Education.

    This Oklahoma state plan documents the policies and procedures that public and private schools, agencies, and institutions follow when providing special education and related services to handicapped children, consistent with Public Law 94-142. Part I includes submission statements and certifications. Part II contains policies, procedures, and…

  6. Board of Governors' Recommendations: FY 2007-09 Biennial Capital Budget and Five-Year Plans

    ERIC Educational Resources Information Center

    Connecticut Department of Higher Education (NJ1), 2006

    2006-01-01

    In accordance with the Connecticut General Statutes Sec. 10a-6 and 10a-8, the Board of Governors' prepares and presents to the Governor and General Assembly a consolidated capital budget request and five-year plan with recommendations for public higher education. Through passage of the UConn 2000 legislation, the University of Connecticut…

  7. Ohio Board of Regents Research Incentive Program. Universities Plans for Use of Funds During the FY 2008-2009 Biennium

    ERIC Educational Resources Information Center

    Ohio Board of Regents, 2008

    2008-01-01

    This document presents the research incentive plans of these Ohio institutions: (1) The University of Akron; (2) Bowling Green State University; (3) Central State University; (4) University of Cincinnati; (5) Cleveland State University; (6) Kent State University; (7) Miami University; (8) Northeastern Ohio Universities College of Medicine; (9) The…

  8. AR and TD Fossil Energy Materials Program. Quarterly progress report for the period ending December 31, 1981

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1982-04-01

    The ORNL Fossil Energy Materials Program Office compiles and issues this combined quarterly progress report from camera-ready copies submitted by each of the participating subcontractor organizations. This report of activities on the program is organized in accordance with a work breakdown structure defined in the AR and TD Fossil Energy Materials Program Plan for FY 1982-1986 in which projects are organized according to fossil energy technologies. This report is divided into parts and chapters with each part describing projects related to a particular fossil energy technology. Chapters within a part provide details of the various projects associated with that technology.more » We hope this series of AR and TD Fossil Energy Materials Program quarterly progress reports will aid in the dissemination of information developed on the program. Plans for the program will be issued annually. A draft of the program plan for FY 1982 to 1986 has been prepared and is in the review process. The implementation of these plans will be reflected by these quarterly progress reports, and this dissemination of information will bw augmented by topical or final reports as appropriate.« less

  9. A new DoD initiative: the Computational Research and Engineering Acquisition Tools and Environments (CREATE) program

    NASA Astrophysics Data System (ADS)

    Arevalo, S.; Atwood, C.; Bell, P.; Blacker, T. D.; Dey, S.; Fisher, D.; Fisher, D. A.; Genalis, P.; Gorski, J.; Harris, A.; Hill, K.; Hurwitz, M.; Kendall, R. P.; Meakin, R. L.; Morton, S.; Moyer, E. T.; Post, D. E.; Strawn, R.; Veldhuizen, D. v.; Votta, L. G.; Wynn, S.; Zelinski, G.

    2008-07-01

    In FY2008, the U.S. Department of Defense (DoD) initiated the Computational Research and Engineering Acquisition Tools and Environments (CREATE) program, a 360M program with a two-year planning phase and a ten-year execution phase. CREATE will develop and deploy three computational engineering tool sets for DoD acquisition programs to use to design aircraft, ships and radio-frequency antennas. The planning and execution of CREATE are based on the 'lessons learned' from case studies of large-scale computational science and engineering projects. The case studies stress the importance of a stable, close-knit development team; a focus on customer needs and requirements; verification and validation; flexible and agile planning, management, and development processes; risk management; realistic schedules and resource levels; balanced short- and long-term goals and deliverables; and stable, long-term support by the program sponsor. Since it began in FY2008, the CREATE program has built a team and project structure, developed requirements and begun validating them, identified candidate products, established initial connections with the acquisition programs, begun detailed project planning and development, and generated the initial collaboration infrastructure necessary for success by its multi-institutional, multidisciplinary teams.

  10. Proposal for continued research in intelligent machines at the Center for Engineering Systems Advanced Research (CESAR) for FY 1988 to FY 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weisbin, C.R.

    1987-03-01

    This document reviews research accomplishments achieved by the staff of the Center for Engineering Systems Advanced Research (CESAR) during the fiscal years 1984 through 1987. The manuscript also describes future CESAR objectives for the 1988-1991 planning horizon, and beyond. As much as possible, the basic research goals are derived from perceived Department of Energy (DOE) needs for increased safety, productivity, and competitiveness in the United States energy producing and consuming facilities. Research areas covered include the HERMIES-II Robot, autonomous robot navigation, hypercube computers, machine vision, and manipulators.

  11. Annual Targets, UAVs and Range Operations Symposium and Exhibition (49th) Held in Fort Walton Beach, Florida on October 25-27, 2011

    DTIC Science & Technology

    2011-10-27

    COMP Mountain Home COMP Shaw COMP Barksdale COMP Hill COMP Homestead ARB COMP Savannah CRTC COMP Gulfport CRTC COMP Alpena CRTC COMP Montana...Spangdahlem AB Aviano AB Kadena AB Programmed: 165 Baseline Pods purchase in FY12 (del FY13) Alpena CRTC Holloman AFB Eielson AFB Planned: 368...ARQ-52(V)2 ARQ-52B(V)2 ARDS (HDIS) ASQ- T35A P4NS (NACTS-RSI) KITS (Kadena) ASQ-T34 ASQ-T46 AKITS ( Alpena ) Israel No Datalink No Datalink P4R1 ASQ

  12. Oceanic surveillance and navigation analysis, FY 72.

    DOT National Transportation Integrated Search

    1972-08-01

    The report summarizes the Oceanic Surveillance and Navigation Analysis performed, at or under the direction of, the Transportation Systems Center under PPA FA-204 for FY72. A methodology has been developed by Systems Control, Inc. for relating the sa...

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report summarizes significant FY93 programmatic information and accomplishments relevant to the individual activities within the Office of Technology Development Program for Research, Development, Demonstration, Testing, and Evaluation (RDDT&E). A brief discussion of the mission of the Office of Environmental Restoration and Waste Management (EM) and the Office of Technology Development is presented. An overview is presented of the major problem areas confronting DOE. These problem areas include: groundwater and soils cleanup; waste retrieval and processing; and pollution prevention. The organizational elements within EM are highlighted. An EM-50 Funding Summary for FY92 and FY93 is also provided. RDDT&E programs aremore » discussed and their key problem areas are summarized. Three salient program-formulating concepts are explained. They are: Integrated Demonstrations, Integrated Programs, and the technology window of opportunity. Detailed information for each of the programs within RDDT&E is presented and includes a fact sheet, a list of technical task plans and an accomplishments and objectives section.« less

  14. National Science Foundation proposed budget could see another increase

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2012-03-01

    President Barack Obama's proposed budget for the U.S. National Science Foundation (NSF) for fiscal year (FY) 2013 would provide the agency with $7.37 billion, a $340 million increase, 4.8% above the FY 2012 estimated budget under which NSF has been operating. NSF has fared well during previous budget cycles, and the Obama administration's budget document for FY 2013 states that “NSF plays a critical role in the implementation of the President's Plan for Science and Technology.” With federal agencies operating under tighter budgets in a difficult financial climate, NSF director Subra Suresh said the budget includes substantial increases for core programs, frontier science, education, and human resources. “I am confident that NSF merits the $7.4 billion the president proposed. I'm optimistic Congress will approve the budget,” Suresh said at a 13 February NSF budget briefing.

  15. NASA Microgravity Science and Applications Program

    NASA Technical Reports Server (NTRS)

    1992-01-01

    Key elements of the microgravity research program as conducted by the Microgravity Science and Applications Division (MSAD) within the Office of Space Science and Applications (OSSA) during fiscal year (FY) 1992 are described. This NASA funded program supported investigators from the university, industry, and government research communities. The program's goals, the approach taken to achieve those goals, and the resources that were available are summarized. It provides a 'snapshot' of the Program's status at the end of FY 1992 and reviews highlights and progress in the ground and flight-based research during the year. It also describes four major space missions that flew during FY 1992, the advanced technology development (ATD) activities, and the plans to use the research potential of Space Station Freedom and other advanced carriers. The MSAD program structure encompassed five research areas: (1) Biotechnology, (2) Combustion Science, (3) Fluid Physics, (4) Materials Science, and (5) Benchmark Physics.

  16. L-325 Sagebrush Habitat Mitigation Project: FY2009 Compensation Area Monitoring Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durham, Robin E.; Sackschewsky, Michael R.

    2009-09-29

    Annual monitoring in support of the Fluor Daniel Hanford Company (Fluor) Mitigation Action Plan (MAP) for Project L-325, Electrical Utility Upgrades was conducted in June 2009. MAP guidelines defined mitigation success for this project as 3000 established sagebrush transplants on a 4.5 ha mitigation site after five monitoring years. Annual monitoring results suggest that an estimated 2130 sagebrush transplants currently grow on the site. Additional activities in support of this project included gathering sagebrush seed and securing a local grower to produce between 2250 and 2500 10-in3 tublings for outplanting during the early winter months of FY2010. If the minimummore » number of seedlings grown for this planting meets quality specifications, and planting conditions are favorable, conservative survival estimates indicate the habitat mitigation goals outlined in the MAP will be met in FY2014.« less

  17. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chew, Joseph T.; Stroh, Suzanne C.; Maio, Linda R.

    1992-10-01

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The plan is an institutional management report for integration with the Department of Energy`s strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory`s scientific and support divisions.« less

  18. Laboratory Directed Research and Development Program FY 2008 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    editor, Todd C Hansen

    2009-02-23

    The Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab or LBNL) is a multi-program national research facility operated by the University of California for the Department of Energy (DOE). As an integral element of DOE's National Laboratory System, Berkeley Lab supports DOE's missions in fundamental science, energy resources, and environmental quality. Berkeley Lab programs advance four distinct goals for DOE and the nation: (1) To perform leading multidisciplinary research in the computing sciences, physical sciences, energy sciences, biosciences, and general sciences in a manner that ensures employee and public safety and protection of the environment. (2) To develop and operatemore » unique national experimental facilities for qualified investigators. (3) To educate and train future generations of scientists and engineers to promote national science and education goals. (4) To transfer knowledge and technological innovations and to foster productive relationships among Berkeley Lab's research programs, universities, and industry in order to promote national economic competitiveness. Berkeley Lab's research and the Laboratory Directed Research and Development (LDRD) program support DOE's Strategic Themes that are codified in DOE's 2006 Strategic Plan (DOE/CF-0010), with a primary focus on Scientific Discovery and Innovation. For that strategic theme, the Fiscal Year (FY) 2008 LDRD projects support each one of the three goals through multiple strategies described in the plan. In addition, LDRD efforts support the four goals of Energy Security, the two goals of Environmental Responsibility, and Nuclear Security (unclassified fundamental research that supports stockpile safety and nonproliferation programs). The LDRD program supports Office of Science strategic plans, including the 20-year Scientific Facilities Plan and the Office of Science Strategic Plan. The research also supports the strategic directions periodically under consideration and review by the Office of Science Program Offices, such as LDRD projects germane to new research facility concepts and new fundamental science directions. Berkeley Lab LDRD program also play an important role in leveraging DOE capabilities for national needs. The fundamental scientific research and development conducted in the program advances the skills and technologies of importance to our Work For Others (WFO) sponsors. Among many directions, these include a broad range of health-related science and technology of interest to the National Institutes of Health, breast cancer and accelerator research supported by the Department of Defense, detector technologies that should be useful to the Department of Homeland Security, and particle detection that will be valuable to the Environmental Protection Agency. The Berkeley Lab Laboratory Directed Research and Development Program FY2008 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the supported projects and summarizes their accomplishments. It constitutes a part of the LDRD program planning and documentation process that includes an annual planning cycle, project selection, implementation, and review.« less

  19. Phase II test plan for the evaluation of the performance of container filling systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BOGER, R.M.

    The PHMC will provide tank wastes for final treatment by BNFL from Hanford's waste tanks. Concerns about the ability for ''grab'' sampling to provide large volumes of representative waste samples has led to the development of a nested, fixed-depth sampling system. Preferred concepts for filling sample containers that meet RCRA organic sample criteria were identified by a PHMC Decision Board. These systems will replace the needle based sampling ''T'' that is currently on the sampling system. This test plan document identifies cold tests with simulants that will demonstrate the preferred bottle filling concepts abilities to provide representative waste samples andmore » will meet RCRA criteria. Additional tests are identified that evaluate the potential for cross-contamination between samples and the ability for the system to decontaminate surfaces which have contacted tank wastes. These tests will be performed with kaolid/water and sand/water slurry simulants in the test rig that was used by AEAT to complete Phase 1 tests in FY 1999.« less

  20. Notification: EPA Enforcement of Superfund Orders and Agreements

    EPA Pesticide Factsheets

    Project #OA&E-FY18-0215, May 10, 2018. The OIG plans to begin preliminary research on the EPA's enforcement of Superfund Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Response Settlements and Unilateral Response Orders.

  1. Notification: Review of EPA’s Transit Subsidy Program

    EPA Pesticide Factsheets

    Project #OA-FY15-0080, January 30, 2015. The Office of Inspector General (OIG) for the U.S. Environmental Protection Agency (EPA) plans to begin preliminary research on EPA’s current transit subsidy practices, policies and procedures.

  2. Notification: Workforce Restructuring Under VERA–VSIP

    EPA Pesticide Factsheets

    Project #OPE-FY14-0049, October 8, 2014. The Office of Inspector General (OIG) for the U.S. Environmental Protection Agency (EPA) plans to begin preliminary research on efforts to restructure the EPA workforce in fiscal year 2014.

  3. Notification: Review of Science to Achieve Results (STAR) Grant Program

    EPA Pesticide Factsheets

    Project #OA-FY12-0606, July 16, 2012. EPA’s Office of Inspector General (OIG) plans to begin preliminary research for an audit of grants awarded under EPA’s Science to Achieve Results (STAR) program.

  4. Notification: Municipal Sewer Systems - Consent Decree Progress and Challenges

    EPA Pesticide Factsheets

    Project #OPE-FY14-0045, August 6, 2014. The EPA OIG plans to begin preliminary research on the EPA's ongoing enforcement initiative focused on keeping raw sewage and contaminated stormwater out of our nation's waters.

  5. Research agenda for an improved novice driver education program

    DOT National Transportation Integrated Search

    1994-05-31

    House Appropriations Committee Report 2750 accompanying the FY 1994 Appropriations Bill requested the National Highway Traffic Safety Administration (NHTSA), U.S. Department of Transportation, to develop a research agenda and plan of action for a str...

  6. Notification: Review on the Effectiveness of EPA's Environmental Education Activities

    EPA Pesticide Factsheets

    Project #OPE-FY15-0050, October 16, 2014. The U.S. Environmental Protection Agency (EPA) Office of Inspector General (OIG) plans to begin preliminary research on the effectiveness of the EPA's Environmental Education activities.

  7. Notification: Evaluation of EPA's Response to Erroneous Laboratory Data

    EPA Pesticide Factsheets

    Project #OPE-FY12-0023, February 20, 2013. The EPA Office of Inspector General (OIG) plans to begin fieldwork with modified objectives from our August 14, 2012, memo on EPA’s response to erroneous laboratory data.

  8. Notification: Evaluation of Time-Critical Removal Actions for Superfund Sites

    EPA Pesticide Factsheets

    Project #OPE-FY15-0019, February 4, 2015. The EPA OIG plans to begin preliminary research on the evaluation of the effectiveness of time-critical removal actions for Superfund sites on February 24, 2015.

  9. Notification: Assessment of EPA Telework Policies and Tools

    EPA Pesticide Factsheets

    Project #OPE-FY16-0028, August 23, 2016. The EPA OIG plans to begin preliminary research to assess the agency's compliance with and implementation of relevant teleworking policies and guidance issued by the Office of Personnel Management.

  10. Notification: Review of Public Protections From Mercury Contamination in Fish

    EPA Pesticide Factsheets

    Project #OPE-FY15-0061, September 9, 2015. The Office of Inspector General (OIG) for the U.S. Environmental Protection Agency (EPA) plans to begin research on existing public protections for mercury contamination in fish.

  11. Notification: Follow-up on a Framework for Developing Tribal Capacity

    EPA Pesticide Factsheets

    Project #OA-FY12-0333, March 1, 2012. We plan to follow-up on the 2008 report Framework for Developing Tribal Capacity Needed in the Indian General Assistance Program. and the Agency’s corrective actions.

  12. N Reactor Deactivation Program Plan. Revision 4

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walsh, J.L.

    1993-12-01

    This N Reactor Deactivation Program Plan is structured to provide the basic methodology required to place N Reactor and supporting facilities {center_dot} in a radiologically and environmentally safe condition such that they can be decommissioned at a later date. Deactivation will be in accordance with facility transfer criteria specified in Department of Energy (DOE) and Westinghouse Hanford Company (WHC) guidance. Transition activities primarily involve shutdown and isolation of operational systems and buildings, radiological/hazardous waste cleanup, N Fuel Basin stabilization and environmental stabilization of the facilities. The N Reactor Deactivation Program covers the period FY 1992 through FY 1997. The directivemore » to cease N Reactor preservation and prepare for decommissioning was issued by DOE to WHC on September 20, 1991. The work year and budget data supporting the Work Breakdown Structure in this document are found in the Activity Data Sheets (ADS) and the Environmental Restoration Program Baseline, that are prepared annually.« less

  13. Shuttle Rocket Motor Program: NASA should delay awarding some construction contracts. Report to the Chair, Subcommittee on Government Activities and Transportation, Committee on Government Operations, House of Representatives

    NASA Technical Reports Server (NTRS)

    1992-01-01

    Even though the executive branch has proposed terminating the Advanced Solid Rocket Motor (ASRM) program, NASA is proceeding with all construction activity planned for FY 1992 to avoid schedule slippage if the program is reinstated by Congress. However, NASA could delay some construction activities for at least a few months without affecting the current launch data schedule. For example, NASA could delay Yellow Creek's motor storage and dock projects, Stennis' dock project, and Kennedy's rotation processing and surge facility and dock projects. Starting all construction activities as originally planned could result in unnecessarily incurring additional costs and termination liability if the funding for FY 1993 is not provided. If Congress decides to continue the program, construction could still be completed in time to avoid schedule slippage.

  14. Thermal management for high power space platform systems

    NASA Technical Reports Server (NTRS)

    Gualdoni, R. A.

    1980-01-01

    With future spacecraft power requirements expected to be in the order of 100 to 250 kilowatts and orbital lifetimes in the order of five to ten years, new approaches and concepts will be required that can efficiently and cost effectively provide the required heat rejection and temperature control capabilities. A plan was established to develop the commensurate technologies necessary for the thermal management of a high power space platform representative of future requirements and to achieve technology readiness by 1987. The approach taken in developing the program was to view the thermal requirements of the spacecraft as a spacecraft system rather than each as an isolated thermal problem. The program plan proposes 45 technology tasks required to achieve technology readiness. Of this total, 24 tasks were subsequently identified as being pacing technology tasks and were recommended for initiation in FY 1980 and FY 1981.

  15. EDI Planning and Implementation Guide.

    DTIC Science & Technology

    1992-06-01

    mentation Guide is designed to both assist DoD activities in the preparation of EDI business plans and to educate DoD personnel on EDI matters. Strategic...business trans- actions be transmitted using EDI by the fourth quarter of FY96. Structure of the Guide The figure below shows how each chapter and appendix...in the Guide relate to each other and their roles in the development of business plans and the education of DoD personnel. Chapters 1, 5, and the

  16. Understanding the Current 30-Year Shipbuilding Plan Through Three Models

    DTIC Science & Technology

    2014-12-01

    to what the Navy can ultimately build in ten years and beyond due to the fact that this plan is revised annually. In a political game this...the game and each one hoping for a different outcome. Though not currently possible with the FY2015 Long Range Plan it is possible to analyze the...to make a choice while the bounded rationality theory acknowledges the limits of human capabilities, knowledge, and capacity. Therefore, bounded

  17. Libraries 2000: Allocation Plan for FY1995 LSCA Funds, Library Service and Construction Act. An Annual Outline and Description of Projects in Idaho Eligible under LSCA Titles I, II, and III.

    ERIC Educational Resources Information Center

    Idaho State Library, Boise.

    The Idaho allocation plan for funds from the Library Service and Construction Act continues the emphasis on priorities listed in fiscal year 1994 and those that were described in the statewide plan for the years 1994 through 1998. These priorities are: (1) advocate for the creation of library districts with adequate tax support to serve the…

  18. Libraries 2000: Allocation Plan for FY1997 LSCA Funds, Library Services and Construction Act. An Annual Outline and Description of Projects in Idaho Eligible under LSCA Titles I, II, and III.

    ERIC Educational Resources Information Center

    Idaho State Library, Boise.

    The Idaho allocation plan for funds from the Library Service and Construction Act (LSCA) continues the emphasis on priorities described in the statewide plan for years 1994-1998. These priorities are: (1) advocate for the creation of library districts with adequate tax support to serve the state's entire population; (2) strengthen cooperation and…

  19. Tanks Focus Area Site Needs Assessment - FY 2001

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Allen, Robert W.; Josephson, Gary B.; Westsik, Joseph H.

    2001-04-30

    The TFA uses a systematic process for developing its annual program that draws from the tanks science and technology development needs expressed by the five DOE tank waste sites. TFA's annual program development process is iterative and involves the following steps: Collection of site needs; Needs analysis; Development of technical responses and initial prioritization; Refinement of the program for the next fiscal year; Formulation of the Corporate Review Budget (CRB); Preparation of Program Execution Guidance (PEG) for the next FY Revision of the Multiyear Program Plan (MYPP). This document describes the outcomes of the first phase of this process, frommore » collection of site needs to the initial prioritization of technical activities. The TFA received site needs in October - December 2000. A total of 170 site needs were received, an increase of 30 over the previous year. The needs were analyzed and integrated, where appropriate. Sixty-six distinct technical responses were drafted and prioritized. In addition, seven strategic tasks were approved to compete for available funding in FY 2002 and FY 2003. Draft technical responses were prepared and provided to the TFA Site Representatives and the TFA User Steering Group (USG) for their review and comment. These responses were discussed at a March 15, 2001, meeting where the TFA Management Team established the priority listing in preparation for input to the DOE Office of Science and Technology (OST) budget process. At the time of publication of this document, the TFA continues to finalize technical responses as directed by the TFA Management Team and clarify the intended work scopes for FY 2002 and FY 2003.« less

  20. A decision-theoretic approach to identifying future high-cost patients.

    PubMed

    Pietz, Kenneth; Byrne, Margaret M; Petersen, Laura A

    2006-09-01

    The objective of this study was to develop and evaluate a method of allocating funding for very-high-cost (VHC) patients among hospitals. Diagnostic cost groups (DCGs) were used for risk adjustment. The patient population consisted of 253,013 veterans who used Department of Veterans Affairs (VA) medical care services in fiscal year (FY) 2003 (October 1, 2002-September 30, 2003) in a network of 8 VA hospitals. We defined VHC as greater than 75,000 dollars (0.81%). The upper fifth percentile was also used for comparison. A Bayesian decision rule for classifying patients as VHC/not VHC using DCGs was developed and evaluated. The method uses FY 2003 DCGs to allocate VHC funds for FY 2004. We also used FY 2002 DCGs to allocate VHC funds for FY 2003 for comparison. The resulting allocation was compared with using the allocation of VHC patients among the hospitals in the previous year. The decision rule identified DCG 17 as the optimal cutoff for identifying VHC patients for the next year. The previous year's allocation came closest to the actual distribution of VHC patients. The decision-theoretic approach may provide insight into the economic consequences of classifying a patient as VHC or not VHC. More research is needed into methods of identifying future VHC patients so that capitation plans can fairly reimburse healthcare systems for appropriately treating these patients.

  1. Chemiresistor microsensors for in-situ monitoring of volatile organic compounds : final LDRD report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thomas, Michael Loren; Hughes, Robert Clark; Kooser, Ara S.

    2003-09-01

    This report provides a summary of the three-year LDRD (Laboratory Directed Research and Development) project aimed at developing microchemical sensors for continuous, in-situ monitoring of volatile organic compounds. A chemiresistor sensor array was integrated with a unique, waterproof housing that allows the sensors to be operated in a variety of media including air, soil, and water. Numerous tests were performed to evaluate and improve the sensitivity, stability, and discriminatory capabilities of the chemiresistors. Field tests were conducted in California, Nevada, and New Mexico to further test and develop the sensors in actual environments within integrated monitoring systems. The field testsmore » addressed issues regarding data acquisition, telemetry, power requirements, data processing, and other engineering requirements. Significant advances were made in the areas of polymer optimization, packaging, data analysis, discrimination, design, and information dissemination (e.g., real-time web posting of data; see www.sandia.gov/sensor). This project has stimulated significant interest among commercial and academic institutions. A CRADA (Cooperative Research and Development Agreement) was initiated in FY03 to investigate manufacturing methods, and a Work for Others contract was established between Sandia and Edwards Air Force Base for FY02-FY04. Funding was also obtained from DOE as part of their Advanced Monitoring Systems Initiative program from FY01 to FY03, and a DOE EMSP contract was awarded jointly to Sandia and INEEL for FY04-FY06. Contracts were also established for collaborative research with Brigham Young University to further evaluate, understand, and improve the performance of the chemiresistor sensors.« less

  2. Avoiding Terminations, Single Offer Competition, and Costly Change Orders with Fixed-Price Contracts

    DTIC Science & Technology

    2015-04-30

    deriving performance outputs from FPDS.6 To ensure reproducibility of this analysis and to provide a starting point for future research, the entirety...available in bulk from USAspending.gov starting in FY2000. However, data quality steadily improves over that decade, particularly in the commonly...available prior to FY2007, the study team chose to set FY2007 as the start date rather than risk sample bias by including only those earlier

  3. SHINE Tritium Nozzle Design: Activity 6, Task 1 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Okhuysen, Brett S.; Pulliam, Elias Noel

    In FY14, we studied the qualitative and quantitative behavior of a SHINE/PNL tritium nozzle under varying operating conditions. The result is an understanding of the nozzle’s performance in terms of important flow features that manifest themselves under different parametric profiles. In FY15, we will consider nozzle design with a focus on nozzle geometry and integration. From FY14 work, we will understand how the SHINE/PNL nozzle behaves under different operating scenarios. The first task for FY15 is to evaluate the FY14 model as a predictor of the actual flow. Considering different geometries is more time-intensive than parameter studies, therefore we recommendmore » considering any relevant flow features that were not included in the FY14 model. In the absence of experimental data, it is particularly important to consider any sources of heat in the domain or boundary conditions that may affect the flow and incorporate these into the simulation if they are significant. Additionally, any geometric features of the beamline segment should be added to the model such as the orifice plate. The FY14 model works with hydrogen. An improvement that can be made for FY15 is to develop CFD properties for tritium and incorporate those properties into the new models.« less

  4. FY71 Engineering Report on Surveillance Techniques for Civil Aviation Security

    DOT National Transportation Integrated Search

    1971-11-01

    This document discusses the work performed by the TSC task group on surveillance techniques in FY71. The principal section is devoted to the technical description, classification and evaluation of commercial metal detectors for concealed weapons. It ...

  5. Feedstock Interface Fy2017 Q3 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carpenter, Danny; Howe, Daniel; Westover, Tyler

    This report summarized the results obtained in FY2017 Q3 of a collaborative effort between researchers at NREL, PNNL, and INL to develop rapid screening methods and models to predict the fact pyrolysis conversion performance of a range of biomass materials.

  6. 76 FR 19977 - Fisheries of the South Atlantic; South Atlantic Fishery Management Council; Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-11

    ... Doubletree Guest Suites Hotel, 181 Church St., Charleston, SC 29401; telephone: (843) 408-8733 or (843) 577... discuss: Fiscal Year (FY) 2011 and FY2012 budgets and additional grant funds; performance measures status...

  7. SAVY-4000 Surveillance and Life Extension Program Fiscal Year 2013 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stone, Timothy A.; Blair, Michael W.; Weis, Eric

    2014-03-03

    The Packaging Surveillance Program section of the DOE M441.1-1 /sup>1, Nuclear Material Packaging Manual (DOE, 2008) requires DOE contractors to “ensure that a surveillance program is established and implemented to ensure the nuclear material storage package continues to meet its design criteria.” In order to ensure continuing safe storage of nuclear material and the maximization of risk reduction, TA-55 has established a Surveillance Program to ensure storage container integrity for operations within its specified design life. The LANL SAVY-4000 Field Surveillance Plan2 defines the near-term field surveillance plan for SAVY-4000 containers as required by the Manual. A long-term surveillance planmore » will be established based on the results of the first several years of surveillance and the results of the lifetime extension studies as defined in the Accelerated Aging Plan3. This report details progress in positioning the Surveillance Program for successful implementation in FY14 and status of the Design Life Extension Program in terms of its implementation and data collection for FY13.« less

  8. A uniform method for the simultaneous blood group phenotyping of Fya , Fyb , Jka , Jkb , S, s̅, P1, k applying lateral-flow technique.

    PubMed

    Caesar, A; Meyer, S; Trost, N; Neuenschwander, K; Geisen, C; Frey, B M; Gassner, C; Schwind, P

    2018-02-01

    A lateral flow assay for simultaneous blood group typing of ABO, RhD, C, E, c, e, Cw and K with stable end-point and without centrifugation is in routine use since several years (MDmulticard ® ). The typing of extended phenotype parameters belonging to the Duffy, Kidd, MNSs blood group systems and others, however, has not yet been demonstrated for this technique. Reliable detection of Fy x , a weak Fy b phenotype with a pronounced quantitative reduction of the number of Fy b antigens on the erythrocyte surface, remains a weakness of current serological blood grouping techniques. The performance characteristics of the following reagents were evaluated in donor and patient samples in lateral flow technology (MDmulticard ® ): Anti-Fy a , -Fy b , -Jk a , -Jk b , -S, -s̅, -P1 and -k. The sensitivity to detect Fy x was in addition evaluated with Fy x positive samples, which had been preselected by MALDI-TOF MS-based genotyping. All results obtained with the MDmulticard ® were in full accordance with those of the CE-certified reference products for all the eight reagent formulations used: Anti-Fy a , -Fy b , -Jk a , -Jk b , -S, -s̅, -P1 and -k. Also, all Fy x phenotypes of the selected population of 93 positive samples, originally identified by MALDI-TOF MS-based genotyping, were reliably detected by the lateral flow assay. Extended phenotype blood group parameters, including the serologically challenging Fy x phenotype, can be determined simultaneously, rapidly and accurately using the lateral flow (MDmulticard ® ) technology, even in cases when IgG class antibodies are the only source of diagnostic antibodies. © 2017 International Society of Blood Transfusion.

  9. Administrative Information Systems Plan for FY89

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-11-01

    The Administrative Information Systems (AIS) Plan was developed to prioritize, track, and control the cost of AIS activities. This annually published plan, in conjunction with quarterly status reports, measures projected AIS activities and progress. The AIS Plan and quarterly reporting are administered jointly by the Director of Computing and an Organization 30 director. Priority development projects are clearly defined and closely managed efforts that consume significant resources. Directorate supplementals describe other AIS activity within each directorate, which may include: production support; technical support; development activity; and other AIS effort.

  10. Notification: Audit of Administratively Determined Positions

    EPA Pesticide Factsheets

    Project #OA-FY18-0085, January 8, 2018. The OIG plans to begin preliminary research on the Office of the Administrator's use of its authority to fill administratively determined positions created pursuant to the Safe Drinking Water Act Amendment of 1978.

  11. Notification: EPA Oversight of Delegated State Resource Conservation and Recovery Act Programs

    EPA Pesticide Factsheets

    Project #OPE-FY16-0033, September 19, 2016. The EPA OIG plans to begin preliminary research on the EPA's oversight of authorized state hazardous waste programs that fall under the Resource Conservation and Recovery Act.

  12. Notification: Gold King Mine Release (2nd notification)

    EPA Pesticide Factsheets

    Project #OPE-FY15-0059, November 4, 2015. The purpose of this memorandum is to notify you of additional issues we plan to review in response to a second congressional request, and additional matters learned since our work began,

  13. Notification: CIGIE Purchase Card Cross-Cutting Project

    EPA Pesticide Factsheets

    Project #OA-FY17-0088, December 20, 2016. The EPA OIG plans to participate in a Council of the Inspectors General on Integrity and Efficiency (CIGIE) purchase card cross-cutting project led by the U.S. Department of Agriculture OIG.

  14. Notification: Evaluation of EPA Oversight of Disaster Debris Management

    EPA Pesticide Factsheets

    Project #OPE-FY15-0012, November 24, 2014. The Office of Inspector General (OIG) for the U.S. Environmental Protection Agency (EPA) plans to begin preliminary research on EPA's oversight of disaster debris management in December 2014.

  15. 75 FR 35076 - Division of Program Coordination, Planning, and Strategic Initiatives, Office of the Director...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-21

    ... discussion are concept review of the following proposed FY 2011 Common Fund initiatives: (1) NIH-HMO Research... Canada): 866-695-1528. Conference code: 7626802625. Place: National Institutes of Health, Building 1...

  16. Notification: Preliminary Research on the Adequacy of EPA's Oversight of State FIFRA Programs

    EPA Pesticide Factsheets

    Project #OPE-FY14-4013, November 06, 2013. The EPA OIG plans to begin preliminary research on the adequacy of the EPA’s oversight of states’ Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) programs.

  17. Annual Plan for the EPA and CSB - FY 2014

    EPA Pesticide Factsheets

    How the OIG will promote economy, efficiency and effectiveness, and prevent and detect fraud, waste and abuse, through independent oversight of the programs and operations of the EPA and the U.S. Chemical Safety and Hazard Investigation Board.

  18. Notification: Follow-up Review of EPA’s Classification of National Security Information

    EPA Pesticide Factsheets

    Project #OPE-FY15-0057, July 20, 2015. The EPA OIG plans to begin preliminary research on the OARM actions taken to improve policies and procedures related to the classification of national security information.

  19. Notification: EPA Progress in Reducing Taxpayer Environmental Liabilities

    EPA Pesticide Factsheets

    Project #OPE-FY15-0052, May 28, 2015. The EPA OIG plans to begin preliminary research on the EPA’s progress in reducing taxpayer liabilities through the use of financial assurance instruments for RCRA facilities and Superfund sites.

  20. Notification: Evaluation of Enforcement Decree Compliance for Selected Clean Air Act Sources

    EPA Pesticide Factsheets

    Project #OPE-FY14-0016, May 22, 2014. The Office of Inspector General (OIG) plans to begin the preliminary research phase of an evaluation of enforcement decree compliance for selected Clean Air Act (CAA) sources.

  1. Notification: Evaluation of EPA Oversight of Hazardous Waste Imports

    EPA Pesticide Factsheets

    Project #OPE-FY14-0036, March 26, 2014. The Office of Inspector General for the U.S. Environmental Protection Agency plans to begin preliminary research on the EPA oversight of hazardous waste imports on April 14, 2014.

  2. Notification: Evaluation of EPA’s Approval Process for Air Quality Dispersion Models

    EPA Pesticide Factsheets

    Project #OPE-FY17-0016, June 5, 2017. The EPA OIG plans to begin preliminary research to assess the effectiveness of EPA's process for reviewing and approving air quality dispersion models it recommends for use.

  3. Notification: Evaluation of EPA Actions to Reduce Methane Distribution Sector Leaks

    EPA Pesticide Factsheets

    Project #OPE-FY13-0016, June 3, 2013. The OIG plans to begin the preliminary research phase of an evaluation of the EPA's efforts to reduce methane leaks from pipelines in the natural gas distribution sector.

  4. Notification: Evaluation of Office of Pesticide Programs’ Genetically Engineered Corn Insect Resistance Management

    EPA Pesticide Factsheets

    Project #OPE-FY15-0055, July 09, 2015. The EPA OIG plans to begin preliminary research on the EPA's ability to manage and prevent increased insect resistance to genetically engineered Bacillus thuringiensis (Bt) corn.

  5. Notification: Evaluation of EPA Policies and Responsiveness to Public Petitions on Pesticide Issues

    EPA Pesticide Factsheets

    Project #OPE-FY15-0004, October 15, 2014. The EPA OIG plans to begin preliminary research on the agency's Office of Chemical Safety and Pollution Prevention (OCSPP) process for responding to public petitions.

  6. Notification: Audit of Certain EPA Electronic Records Management Practices

    EPA Pesticide Factsheets

    Project #OA-FY13-0113, December 13, 2012. This memorandum is to notify you that the U.S. Environmental Protection Agency (EPA), Office of Inspector General, plans to begin an audit of certain EPA electronic records management practices.

  7. FY 2002 strategic plan, Georgia Department of Transportation

    DOT National Transportation Integrated Search

    2001-08-01

    The Georgia DOT is authorized by Title 32 of the Georgia Code to organize, administer and operate an efficient, modern system of public roads, highways and other modes of transportation including public transit, rail, aviation, ports and bicycle and ...

  8. Structures and Dynamics Division research and technology plans, fiscal year, 1981

    NASA Technical Reports Server (NTRS)

    Bales, K. S.

    1981-01-01

    The objectives, expected results, approach, and FY 81 milestones for the Structures and Dynamics Division's research program are presented. This information will be useful in program coordination with other government organizations in areas of mutual interest.

  9. ARIES Oxide Production Program Annual Report - FY14

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kelley, Evelyn A.; Dinehart, Steven Mark

    A summary of the major accomplishments (September), milestones, financial summary, project performance and issues facing the ARIES Oxide Production Program at the close of FY14 is presented in this Executive Summary. Annual accomplishments are summarized in the body of the report.

  10. DOE Solar Energy Technologies Program FY 2005 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sutula, Raymond A.

    The DOE Solar Energy Technologies Program FY 2005 Annual Report chronicles the R&D results of the program for fiscal year 2005. In particular, the report describes R&D performed by the Program’s national laboratories and university and industry partners.

  11. The Federal Aviation Administration Plan for Research, Engineering and Development. Volume 1. Program Plan

    DTIC Science & Technology

    1989-01-01

    Mid * Advanced Propulsion System Far * Rotor Burst Protection Reports Mid 11.4 Flight Safety / * Aircraft Icing Handbook Near Atmospheric Hazards...with operating the national aviation system include air traffic controllers, flight service specialists, maintenance technicians, safety inspectors...address the design and certification of flight deck systems and revised crew training requirements. In FY 1988, studies of safety data were initiated to

  12. Director, Operational Test and Evaluation FY 2014 Annual Report

    DTIC Science & Technology

    2015-01-01

    Federal Departments and Agencies. Mitigation measures such as curtailment of wind turbine operations during test periods, identification of alternative...impact of wind turbines on ground-based and airborne radars, and this investment may help mitigate interference of wind turbines with test range...Frequency Active (SURTASS CLFA) Test Plan Tactical Unmanned Aircraft System Tactical Common Data Link (Shadow) FOT&E OTA Test Plan Tempest Wind 2014

  13. Final Report (O1-ERD-051) Dynamic InSAR: Imaging Seismic Waves Remotely from Space

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vincent, P; Rodgers, A; Dodge, D

    2003-02-07

    The purpose of this LDRD project was to determine the feasibility of using InSAR (interferometric synthetic aperture radar) to image seismic waves remotely from space. If shown to be feasible, the long-term goal of this project would be to influence future SAR satellite missions and airborne SAR platforms to include a this new capability. This final report summarizes the accomplishments of the originally-planned 2-year project that was cut short to 1 year plus 2 months due to a funding priority change that occurred in the aftermath of the September 11th tragedy. The LDRD-ER project ''Dynamic InSAR: Imaging Seismic Waves frommore » Space'' (01-ERD-051) began in October, (FY01) and ended in December (FY02). Consequently, most of the results and conclusions for this project are represented in the FY0l Annual Report. Nonetheless, additional conclusions and insights regarding the progress of this work are included in this report. In should be noted that this work was restarted and received additional funding under the NA-22 DOE Nonproliferation Program in FY03.« less

  14. Mass Transit: Implementation of FTA’s New Starts Evaluation Process and FY 2001 Funding Proposals

    DTIC Science & Technology

    2000-04-01

    formalize the process. FTA issued a proposed rule on April 7, 1999, and plans to issue final regulations by the summer of 2000. In selecting projects for...commit funds to any more New Starts projects during the last 2 years of TEA-21—through fiscal year 2003. Because there are plans for many more...regional review of alternatives, develop preliminary engineering plans , and meet FTA’s approval for the final design. TEA-21 requires that FTA evaluate

  15. Structural dynamics division research and technology accomplishments for fiscal year 1990 and plans for fiscal year 1991

    NASA Technical Reports Server (NTRS)

    Wynne, Eleanor C.

    1991-01-01

    The research accomplishments of the Structural Dynamics Division for F.Y. 1991 are presented. The work is discussed in terms of highlights of accomplishments during the past year and plans for the current year as they relate to 5-year plans and the objectives of each technical area. Included is research on unsteady aerodynamics, helicopter rotors, computational fluid dynamics, oscillations of leading edge flaps of a delta wing, and aircraft wing loads.

  16. Internal Controls for the Military Sealift Command Portion of the Transportation Business Area of the FY 1994 Defense Business Operations Fund Financial Statements

    DTIC Science & Technology

    1995-06-28

    Secondary Reports Dilution Unit, Audit Planning and Technical Support Directorate, at (703) 604-8937 (DSN 664-8937) or FAX (703) 604-8932. Suggestions...for Future Audits To suggest ideas for or to request future audits , contact the Planning and Coordination Branch, Audit Planning and Technical...Defense OAIG-AUD (ATTN: APTS Audit Suggestions) 400 Army Navy Drive (Room 801) Arlington, Virginia 22202-2884 DoD Hotline To report fraud, waste

  17. Initial In-flight Results: The Total Solar Irradiance Monitor on the FY-3C Satellite, an Instrument with a Pointing System

    NASA Astrophysics Data System (ADS)

    Wang, Hongrui; Qi, Jin; Li, Huiduan; Fang, Wei

    2017-01-01

    The total solar irradiance (TSI) has been recorded daily since October 2013 by the Total Solar Irradiance Monitor (TSIM) onboard the FY-3C satellite, which is mainly designed for Earth observation. The TSIM has a pointing system to perform solar tracking using a sun sensor. The TSI is measured by two electrical substitution radiometers with traceability to the World Radiation Reference. The TSI value measured with the TSIM on 2 October 2013 is 1364.88 W m^{-2} with an uncertainty of 1.08 W m^{-2}. Short-term TSI variations recorded with the TSIM show good agreement with SOHO/VIRGO and SORCE/TIM. The data quality and accuracy of FY-3C/TSIM are much better than its predecessors on the FY-3A and FY-3B satellites, which operated in a scanning mode.

  18. Phase 1 Methyl Iodide Deep-Bed Adsorption Tests

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Soelberg, Nick; Watson, Tony

    2014-08-22

    Nuclear fission results in the production of fission products (FPs) and activation products including iodine-129, which could evolve into used fuel reprocessing facility off-gas systems, and could require off-gas control to limit air emissions to levels within acceptable emission limits. Research, demonstrations, and some reprocessing plant experience have indicated that diatomic iodine can be captured with efficiencies high enough to meet regulatory requirements. Research on the capture of organic iodides has also been performed, but to a lesser extent [Jubin 2012b]. Several questions remain open regarding the capture of iodine bound in organic compounds. Deep-bed methyl iodide adsorption testing hasmore » progressed according to a multi-laboratory methyl iodide adsorption test plan. This report summarizes the first phase of methyl iodide adsorption work performed according to this test plan using the deep-bed iodine adsorption test system at the Idaho National Laboratory (INL), performed during Fiscal Year (FY) 2013 and early FY-2014. Testing has been performed to address questions posed in the test plan, and followed the testing outline in the test plan. Tests established detection limits, developed procedures for sample analysis with minimal analytical interferences, and confirmed earlier results that show that the methyl iodide reacts when in contact with the AgZ sorbent, and not significantly in the gas flow upstream of the sorbent. The reaction(s) enable separation of the iodine from the organic moiety, so that the iodine can chemisorb onto the sorbent. The organic moiety can form other compounds, some of which are organic compounds that are detected and can be tentatively identified using GC-FID and GCMS. Test results also show that other gas constituents (NOx and/or H2O) can affect the methyl iodide reactions. With NOx and H2O present in the gas stream, the majority of uncaptured iodine exiting iodine-laden sorbent beds is in the form of I2 or HI, species that are soluble in NaOH scrubbing solution for iodine analysis. But when NOx and H2O are not present, then the majority of the uncaptured iodine exiting iodine-laden sorbent is in the form of methyl iodide. Methyl iodide adsorption efficiencies have been high enough so that initial DFs exceed 1,000 to 10,000. The methyl iodide mass transfer zone depths are estimated at 4-8 inches, possibly deeper than mass transfer zone depths estimated for I2 adsorption on AgZ. Additional deep-bed testing and analyses are recommended to (a) expand the data base for methyl iodide adsorption under various conditions specified in the methyl iodide test plan, and (b) provide more data for evaluating organic iodide reactions and reaction byproducts for different potential adsorption conditions.« less

  19. Notification: Audit of the EPA's Oversight of Smokestack Emissions Testing and Reporting

    EPA Pesticide Factsheets

    Project #OA&E-FY18-0186, April 10, 2018. The OIG plans to begin preliminary research for an audit of the EPA's oversight of smokestack emissions testing and reporting, with an initial emphasis on EPA Region 10.

  20. Notification: Audit of EPA's Office of Criminal Enforcement, Forensics and Training's Law Enforcement Availability Pay Reporting

    EPA Pesticide Factsheets

    Project #OA-FY18-0075, November 30, 2017. The EPA OIG plans to begin preliminary research on the EPA Office of Criminal Enforcement, Forensics and Training's (OCEFT's) law enforcement availability pay (LEAP) reporting.

Top